AB 1017: Energy: electrical and gas corporations: general rate cases.
- Session Year: 2025-2026
- House: Assembly
- Latest Version Date: 2025-10-01
Current Status:
Passed
(2025-10-01: Chaptered by Secretary of State - Chapter 177, Statutes of 2025.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law authorizes the Public Utilities Commission to fix the rates and charges for public utilities, including electrical corporations and gas corporations, and requires the rates and charges to be just and reasonable. Existing law requires the commission, following the approval of a general rate case of an electrical corporation or gas corporation, to review which costs, if any, differed from the general rate case forecasts and to adjust the revenue requirements in the subsequent general rate case based on the actual past costs in the corporation records.
This bill would require an electrical corporation or gas corporation, as a part of its general rate case, to provide to the commission certain information, including, among other things, the authorized and actual rate of return and return on equity for the past 10 years and projects related to the corporations distribution capacity that include the forecast submitted in the prior general rate case of the corporation.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act, and because a violation of a commission action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes the Public Utilities Commission to fix the rates and charges for public utilities, including electrical corporations and gas corporations, and requires the rates and charges to be just and reasonable. Existing law requires the commission, following the approval of a general rate case of an electrical corporation or gas corporation, to review which costs, if any, differed from the general rate case forecasts and to adjust the revenue requirements in the subsequent general rate case based on the actual past costs in the corporation records.
This bill would require an electrical corporation or gas corporation, as a part of its general rate case, to provide to the commission certain information, including, among other things, the authorized and actual rate of return and return on equity for the past 10 years and projects related to the corporations distribution capacity that include the forecast submitted in the prior general rate case of the corporation.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act, and because a violation of a commission action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes the Public Utilities Commission to fix the rates and charges for public utilities, including electrical corporations and gas corporations, and requires the rates and charges to be just and reasonable. Existing law requires the commission, following the approval of a general rate case of an electrical corporation or gas corporation, to review which costs, if any, differed from the general rate case forecasts and to adjust the revenue requirements in the subsequent general rate case based on the actual past costs in the corporation records.
This bill would require an electrical corporation or gas corporation, as a part of its general rate case, to provide to the commission certain information, including, among other things, the authorized and actual rate of return and return on equity for the past 10 years and projects related to the corporations distribution capacity that include the forecast submitted in the prior general rate case of the corporation.
Under existing law, a violation of the Public Utilities Act, a violation of the act Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provision provisions of this bill would be a part of the act, and because a violation of which a commission action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The Public Utilities Act requires an electrical corporation to report annually to the Public Utilities Commission on its compliance with the standards and rules adopted by the commission. The act requires an electrical or gas corporation to notify annually the commission, as part of an ongoing proceeding or in a report required to be submitted to the commission, of each time since that notification was last provided that capital or expense revenue authorized by the commission for maintenance, safety, or reliability was redirected by the electrical or gas corporation to other purposes.
This bill would require electrical or gas corporations, in a report required to be submitted annually to the commission, to include in the report the capacity of its electrical or gas distribution system, respectively.
Under the Public Utilities Act, a violation of the act is a crime.
Because the provision of this bill would be a part of the act, a violation of which would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(a)For purposes of this section, utility means an electrical corporation or a gas corporation.
(b)As a part of its general rate case, a utility shall report to the commission all of the following:
(1)For any work category, the amount authorized for the test year in the last general rate case and the amount authorized based on escalation for the last year of the prior general rate case.
(2)For any work category, the actual recorded amounts during the past 10 years split between labor and nonlabor costs and between capital and expenses.
(3)For any asset repair, installation, or replacement work, the number of units installed, repaired, or replaced during the past 10 years.
(4)The authorized and actual rate of return and return on equity for the past 10 years.
(5)For distribution capacity, all of the following:
(A)The projects included in the forecast submitted in the prior general rate case.
(B)The projects actually conducted so far in the prior general rate case or planned to be started during the prior general rate case cycle.
(C)Which projects included in the forecast submitted in the prior general rate case are included in the forecast for the pending general rate case.
(D)Which projects included in the prior general rate case have been canceled or indefinitely delayed and the reasons for the cancellation or delay.
(6)A breakdown by program of any capital costs included in the pending general rate case that exceed previously authorized levels or that have not been previously found to be reasonable.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)For purposes of this section, utility means an electrical corporation or a gas corporation.
(b)As a part of its general rate case, a utility shall report to the commission all of the following:
(1)For any work category, the amount authorized for the test year in the last general rate case and the amount authorized based on escalation for the last year of the prior general rate case.
(2)For any work category, the actual recorded amounts during the past 10 years split between labor and nonlabor costs and between capital and expenses.
(3)For any asset repair, installation, or replacement work, the number of units installed, repaired, or replaced during the past 10 years.
(4)The authorized and actual rate of return and return on equity for the past 10 years.
(5)For distribution capacity, all of the following:
(A)The projects included in the forecast submitted in the prior general rate case.
(B)The projects actually conducted so far in the prior general rate case or planned to be started during the prior general rate case cycle.
(C)Which projects included in the forecast submitted in the prior general rate case are included in the forecast for the pending general rate case.
(D)Which projects included in the prior general rate case have been canceled or indefinitely delayed and the reasons for the cancellation or delay.
(6)A breakdown by program of any capital costs included in the pending general rate case that exceed previously authorized levels or that have not been previously found to be reasonable.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)For purposes of this section, utility means an electrical corporation or a gas corporation.
(b)As a part of its general rate case, a utility shall report to the commission all of the following:
(1)For any work category, the amount authorized for the test year in the last general rate case and the amount authorized based on escalation for the last year of the prior general rate case.
(2)For any work category, the actual recorded amounts during the past 10 years split between labor and nonlabor costs and between capital and expenses.
(3)For any asset repair, installation, or replacement work, the number of units installed, repaired, or replaced during the past 10 years.
(4)The authorized and actual rate of return and return on equity for the past 10 years.
(5)For distribution capacity, all of the following:
(A)The projects included in the forecast submitted in the prior general rate case.
(B)The projects actually conducted so far in the prior general rate case or planned to be started during the prior general rate case cycle.
(C)Which projects included in the forecast submitted in the prior general rate case are included in the forecast for the pending general rate case.
(D)Which projects included in the prior general rate case have been canceled or indefinitely delayed and the reasons for the cancellation or delay.
(6)A breakdown by program of any capital costs included in the pending general rate case that exceed previously authorized levels or that have not been previously found to be reasonable.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Section 592 is added to the Public Utilities Code, to read:592.In a report required to be submitted annually to the commission, each electrical or gas corporation shall include in the report the capacity of its electrical or gas distribution system, respectively.SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.In a report required to be submitted annually to the commission, each electrical or gas corporation shall include in the report the capacity of its electrical or gas distribution system, respectively.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Oct 1, 2025 | Chaptered by Secretary of State - Chapter 177, Statutes of 2025. |
| Oct 1, 2025 | Approved by the Governor. |
| Sep 9, 2025 | Enrolled and presented to the Governor at 3 p.m. |
| Sep 3, 2025 | In Assembly. Ordered to Engrossing and Enrolling. |
| Sep 3, 2025 | Read third time. Passed. Ordered to the Assembly. (Ayes 40. Noes 0. Page 2463.). |
| Aug 20, 2025 | Read second time. Ordered to third reading. |
| Aug 19, 2025 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| Jun 26, 2025 | In committee: Hearing postponed by committee. |
| Jun 17, 2025 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 14. Noes 0.) (June 17). Re-referred to Com. on APPR. |
| Jun 4, 2025 | Referred to Com. on E., U & C. |
| May 23, 2025 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 23, 2025 | Read third time. Passed. Ordered to the Senate. (Ayes 71. Noes 0. Page 1663.) |
| May 15, 2025 | Read second time. Ordered to Consent Calendar. |
| May 14, 2025 | From committee: Do pass. To Consent Calendar. (Ayes 15. Noes 0.) (May 14). |
| Apr 24, 2025 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 18. Noes 0.) (April 23). Re-referred to Com. on APPR. |
| Apr 7, 2025 | Re-referred to Com. on U. & E. |
| Apr 3, 2025 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Apr 2, 2025 | In committee: Hearing postponed by committee. |
| Mar 10, 2025 | Referred to Com. on U. & E. |
| Feb 21, 2025 | From printer. May be heard in committee March 23. |
| Feb 20, 2025 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 3, 2025 | Assembly 3rd Reading AB1017 Boerner By Becker | Senate Floor |
Passed |
|
| Jun 17, 2025 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
|
| May 23, 2025 | AB 1017 Boerner Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| May 14, 2025 | Do pass. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 23, 2025 | Do pass and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar | Assembly Standing Committee on Utilities and Energy |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| California Solar + Storage Association | ** Support | |
| City Of San Diego | ** Support | |
| The Utility Reform Network | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 1017 |
THIRD READING
Bill No: AB 1017
Author: Boerner (D)
Amended: 4/3/25 in Assembly
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 14-0, 6/17/25
AYES: Becker, Ochoa Bogh, Allen, Archuleta, Arreguín, Caballero, Dahle, Hurtado, Limón, McNerney, Rubio, Stern, Strickland, Wahab
NO VOTE RECORDED: Ashby, Gonzalez, Grove
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 71-0, 5/23/25 (Consent) - See last page for vote
SUBJECT: Energy: electrical and gas corporations: general rate cases
SOURCE: Author
DIGEST:
This bill requires specified data and information as part of an energy utility’s general rate case (GRC) application filing at the California Public Utilities Commission (CPUC).
ANALYSIS:
Existing law:
- Establishes and vests the CPUC with regulatory authority over public utilities, including electrical and gas corporations. (Article XII of the California Constitution)
- Authorizes the CPUC to fix the rates and charges for public utilities, including electrical corporations and gas corporations, and requires the rates and charges to be just and reasonable. (Public Utilities Code §451)
- Requires the CPUC, following the approval of a GRC of an electrical corporation or gas corporation, to review which costs, if any, differed from the GRC forecasts and to adjust the revenue requirements in the subsequent GRC based on the actual past costs in the corporation records. (Public Utilities Code §451.8)
This bill:
- Requires an electrical corporation or gas corporation, as a part of its GRC, to provide to the CPUC certain information, including, among other things:
- The corporation’s authorized and actual rate of return and return on equity for the past 10 years.
- For any asset repair, installation, or replacement work, the number of units installed, repaired, or replaced during the past 10 years.
- Projects related to the corporation’s distribution capacity that include the forecast submitted in the prior GRC of the corporation, which projects have been conducted or will be started, canceled, or indefinitely delayed, and which projects that are included in the prior general rate case forecast are included in the forecast for the pending GRC.
Background
General Rate Case. The CPUC addresses the costs of operating and maintaining investor-owned utility systems through GRC proceedings. The CPUC evaluates detailed cost data from both past expenses and utility forecasts of likely future costs, and establishes how much money the utilities are allowed to collect for the first year – called a test year. They then prescribe how to adjust the test year budget for inflation and other factors that may affect costs, such as additional capital projects, for the following three years, summing to a total of four years that each GRC cycle encompasses.
2023 State Auditor’s Report. A 2023 report by the State Auditor investigated causes of increasing electricity and natural gas rates, and recommended options for limiting rate increases. The State Auditor concluded that, while some of the elements contributing to electricity and natural gas rate increases are outside of the control of the CPUC – due to needed upgrades to the electrical system, wildfire mitigation efforts, and weather conditions – the CPUC can better protect customers by implementing improvements to its oversight. These recommendations included, among others: (1) promoting transparency by instituting a process that requires utilities to periodically publish actual rate of return calculations; and (2) requires energy utilities to identify major costs categories savings were achieved when the projected costs exceeded actual costs, and publish and analyze this information. This bill seeks to institute those recommendations at the CPUC.
Distribution capacity work is a growing need and contributes to increasing energy utility bills. According to the CPUC’s most recent SB 695 Cost Report (July 2024), the distribution revenue requirement has significantly grown over time, with a substantial increase occurring between January 1, 2023 and January 1, 2024. This increase in distribution revenue requirement from January 1, 2023 to January 1, 2024 is mainly due to Pacific Gas & Electric’s (PG&E’s) distribution revenue requirement increasing by about 78%. By comparison, Southern California Edison’s (SCE’s) distribution revenue requirement over this time period increased by about 17%, and San Diego Gas & Electric’s distribution revenue requirement decreased by about one percent. Roughly three-quarters of this increase in PG&E’s distribution revenue requirement is attributed to costs approved in PG&E’s 2023 GRC. These types of costs include power lines, poles, transformers, repair crews and emergency services, as well as certain wildfire mitigation costs related to grid reliability and safety, including liability insurance. The other approximately one-quarter of this increase is primarily due to wildfire mitigation and catastrophic event costs approved in several PG&E applications filed outside of the GRC proceeding process. These costs were incurred over several years, beginning in 2017, but not recovered in rates until 2024. Additionally, the demands for energization projects to support electricity service for new or expanded load, especially new housing, hospitals, and other demands, often necessitates upgrades to distribution capacity.
Comments
Need for this bill. Proponents of this bill contend that securing specific data from the regulated gas and electric corporations to help parties engage in the GRC proceeding can take a lot of time, contributing to delaying the CPUC decisions on these cases, and also can be difficult to get from the corporations. While GRCs afford the parties opportunities for discovery, it takes much time and back-and-forth between the corporation and the parties in the proceeding. Other efforts, including the Public Advocates Office (PAO) development of the Master Data Request to obtain initial data in GRCs, is helpful in assisting parties in securing data to evaluate the corporation’s rate case application. However, the Master Data Request does not encompass all elements of the data requested by this bill. The Utility Reform Network (TURN) contends this bill will provide increased transparency and promote efficiency in the review and processing of a utility’s GRC.
They argue that the provisions of this bill would address at least three problems that “presently hamper a complete and efficient review of utility requests for rate increases.” These include: (1) utilities are not required to provide the data that is necessary to evaluate the reasonableness of utility requests; (2) utilities provide historical cost data but not how much work was completed; and (3) the need and impact of spending on distribution capacity work is extremely opaque and difficult to review. TURN states: “The requirements of AB 1017 provide more data on specific projects included in rate case forecasts, and projects deferred or canceled from the last rate case, would allow more expeditious and meaningful review of utility forecasts of spending in this critical category.”
Concerns? While not taking a position on this bill, SCE and PG&E have raised concerns that requiring 10 years of data, as proposed by this bill, would provide data that does not account for the changing risks and conditions. They also have concerns that the 10 years does not align well with the GRC cycles, which generally cover four years (previously three). The PAO, though not taking a position on this bill, has expressed that some of the data required by this bill does overlap with data already secured in the GRC and the new data requirements would be beneficial, including the 10 years of data on the authorized and actual rate of return and return on equity. In this regard, this bill is largely attempting to provide greater transparency and help make the GRC proceedings more efficient.
Related/Prior Legislation
AB 2666 (Boerner, Chapter 413, Statutes of 2024) made explicit the need for the CPUC to improve its frequency and review of forecasted costs by electric and gas utilities to better protect customers from increasing utility bills.
AB 2847 (Addis, Chapter 578, Statutes of 2024) required electrical and gas corporations in their request for capital expenditures to provide their best estimation of the impact of the proposed expenditures on the utility’s authorized revenue for each year of the life of the capital asset.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 8/18/25)
California Solar + Storage Association
City of San Diego
The Utility Reform Network
OPPOSITION: (Verified 8/18/25)
None received
ARGUMENTS IN SUPPORT: The California Solar and Storage Association states:
Utilities have tripled spending on the electric grid over the past 15 years, despite peak load staying flat over that period. Under the current general rate case process, it is difficult to see where the utilities have spent the money they have been authorized to spend. The most important step in reducing rates in California is checking the runaway utility spending that has caused those high rates. By requiring utilities to clearly report the actual recorded amounts for each work category for the past 10 years, AB 1017 brings increased accounting that California needs. Additionally, by requiring the utilities to clearly outline programs where proposed capital spending exceeds previously authorized levels, AB 1017 makes it easier to highlight runaway utility spending.
ASSEMBLY FLOOR: 71-0, 5/23/25
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Calderon, Caloza, Carrillo, Castillo, Connolly, Davies, DeMaio, Dixon, Elhawary, Flora, Fong, Gabriel, Gallagher, Garcia, Gipson, Jeff Gonzalez, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Muratsuchi, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Solache, Soria, Stefani, Ta, Tangipa, Valencia, Wallis, Ward, Wilson, Zbur, Rivas
NO VOTE RECORDED: Bryan, Chen, Ellis, Nguyen, Sanchez, Schultz, Sharp-Collins, Wicks
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
8/20/25 23:28:44
**** END ****
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Josh Becker, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 6/17/2025
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill requires specified data and information as part of an energy utility’s general rate case (GRC) application filing.
ANALYSIS:
Existing law:
- Establishes and vests the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical and gas corporations. (Article XII of the California Constitution)
- Authorizes the CPUC to fix the rates and charges for public utilities, including electrical corporations and gas corporations, and requires the rates and charges to be just and reasonable. (Public Utilities Code §451)
- Requires the CPUC, following the approval of a GRC of an electrical corporation or gas corporation, to review which costs, if any, differed from the GRC forecasts and to adjust the revenue requirements in the subsequent GRC based on the actual past costs in the corporation records. (Public Utilities Code §451.8)
This bill:
- Requires an electrical corporation or gas corporation, as a part of its GRC, to provide to the CPUC certain information, including, among other things:
- The corporation’s authorized and actual rate of return and return on equity for the past 10 years.
- For any asset repair, installation, or replacement work, the number of units installed, repaired, or replaced during the past 10 years.
- Projects related to the corporation’s distribution capacity that include the forecast submitted in the prior GRC of the corporation, which projects have been conducted or will be started, canceled, or indefinitely delayed, and which projects that are included in the prior general rate case forecast are included in the forecast for the pending GRC.
Background
General Rate Case. The CPUC addresses the costs of operating and maintaining investor-owned utility systems through GRC proceedings. The CPUC evaluates detailed cost data from both past expenses and utility forecasts of likely future costs, and establishes how much money the utilities are allowed to collect for the first year – called a test year. They then prescribe how to adjust the test year budget for inflation and other factors that may affect costs, such as additional capital projects, for the following three years, summing to a total of four years that each GRC cycle encompasses.
2023 State Auditor’s Report. A 2023 report by the State Auditor investigated causes of increasing electricity and natural gas rates, and recommended options for limiting rate increases. The State Auditor concluded that, while some of the elements contributing to electricity and natural gas rate increases are outside of the control of the CPUC – due to needed upgrades to the electrical system, wildfire mitigation efforts, and weather conditions – the CPUC can better protect customers by implementing improvements to its oversight. These recommendations included, among others: (1) promoting transparency by instituting a process that requires utilities to periodically publish actual rate of return calculations; and (2) require energy utilities to identify major costs categories savings were achieved when the projected costs exceeded actual costs, and publish and analyze this information. This bill seeks to institute those recommendations at the CPUC.
Distribution capacity work is a growing need and contributes to increasing energy utility bills. According to the CPUC’s most recent SB 695 Cost Report (July 2024), the distribution revenue requirement has significantly grown over time, with a substantial increase occurring between January 1, 2023 and January 1, 2024. This increase in distribution revenue requirement from January 1, 2023 to January 1, 2024 is mainly due to Pacific Gas & Electric’s (PG&E’s) distribution revenue requirement increasing by about 78%. By comparison, Southern California Edison’s (SCE’s) distribution revenue requirement over this time period increased by about 17%, and San Diego Gas & Electric’s (SDG&E’s) distribution revenue requirement decreased by about one percent. Roughly three-quarters of this increase in PG&E’s distribution revenue requirement is attributed to costs approved in PG&E’s 2023 GRC. These types of costs include power lines, poles, transformers, repair crews and emergency services, as well as certain wildfire mitigation costs related to grid reliability and safety, including liability insurance. The other approximately one-quarter of this increase is primarily due to wildfire mitigation and catastrophic event costs approved in several PG&E applications filed outside of the GRC proceeding process. These costs were incurred over several years, beginning in 2017, but not recovered in rates until 2024. Additionally, the demands for energization projects to support electricity service for new or expanded load, especially new housing, hospitals, and other demands, often necessitates upgrades to distribution capacity.
Comments
Need for this bill. Proponents of this bill contend that securing specific data from the regulated gas and electric corporations to help parties engage in the GRC proceeding can take a lot of time, contributing to delaying the CPUC decisions on these cases, and also can be difficult to get from the corporations. While GRCs afford the parties opportunities for discovery, it takes much time and back-and-forth between the corporation and the parties in the proceeding. Other efforts, including the Public Advocates Office (PAO) development of the Master Data Request to obtain initial data in GRCs, is helpful in assisting parties in securing data to evaluate the corporation’s rate case application. However, the Master Data Request does not encompass all elements of the data requested by this bill. The Utility Reform Network (TURN) contends this bill will provide increased transparency and promote efficiency in the review and processing of a utility’s GRC.
They argue that the provisions of this bill would address at least three problems that “presently hamper a complete and efficient review of utility requests for rate increases.” These include: (1) utilities are not required to provide the data that is necessary to evaluate the reasonableness of utility requests; (2) utilities provide historical cost data but not how much work was completed; and (3) the need and impact of spending on distribution capacity work is extremely opaque and difficult to review. TURN states: “The requirements of AB 1017 provide more data on specific projects included in rate case forecasts, and projects deferred or canceled from the last rate case, would allow more expeditious and meaningful review of utility forecasts of spending in this critical category.”
Concerns? While not taking a position on this bill, SCE and PG&E have raised concerns that requiring 10 years of data, as proposed by this bill, would provide data that does not account for the changing risks and conditions. They also have concerns that the 10 years does not align well with the GRC cycles, which generally cover four years (previously three). The PAO, though not taking a position on this bill, has expressed that some of the data required by this bill does overlap with data already secured in the GRC and the new data requirements would be beneficial, including the 10 years of data on the authorized and actual rate of return and return on equity. In this regard, this bill is largely attempting to provide greater transparency and help make the GRCs proceeding more efficient.
Prior/Related Legislation
AB 2666 (Boerner, Chapter 413, Statutes of 2024) made explicit the need for the CPUC to improve its frequency and review of forecasted costs by electric and gas utilities to better protect customers from increasing utility bills.
AB 2847 (Addis, Chapter 578, Statutes of 2024) required electrical and gas corporations in their request for capital expenditures to provide their best estimation of the impact of the proposed expenditures on the utility’s authorized revenue for each year of the life of the capital asset.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
California Solar + Storage Association
The Utility Reform Network
OPPOSITION:
None received
ARGUMENTS IN SUPPORT: The California Solar and Storage Association states:
Utilities have tripled spending on the electric grid over the past 15 years, despite peak load staying flat over that period. Under the current general rate case process, it is difficult to see where the utilities have spent the money they have been authorized to spend. The most important step in reducing rates in California is checking the runaway utility spending that has caused those high rates. By requiring utilities to clearly report the actual recorded amounts for each work category for the past 10 years, AB 1017 brings increased accounting that California needs. Additionally, by requiring the utilities to clearly outline programs where proposed capital spending exceeds previously authorized levels, AB 1017 makes it easier to highlight runaway utility spending.
-- END --
Date of Hearing: May 14, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 1017
Author:(Boerner) – As Amended Ver:April 3, 2025
Policy Committee: | Utilities and Energy | Vote: | 18 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill expands and specifies information an electrical or gas utility subject to rate regulation by the California Public Utilities Commission (CPUC) must provide as part of its general rate case (GRC).
The information is:
- For any work category, the amount authorized for the test year in the last GRC and the amount authorized based on escalation for the last year of the prior GRC.
- For any work category, the actual recorded amounts during the past 10 years split between labor and nonlabor costs and between capital and expenses.
- For any asset repair, installation, or replacement work, the number of units installed, repaired, or replaced during the past 10 years.
- The authorized and actual rate of return and return on equity for the past 10 years.
- For distribution capacity: (a) the projects included in the forecast submitted in the prior GRC, (b) the projects actually conducted so far in the prior GRC or planned to be started during the prior GRC cycle, (c) which projects included in the forecast submitted in the prior GRC are included in the forecast for the pending GRC, (d) which projects included in the prior GRC have been canceled or indefinitely delayed and the reasons for the cancellation or delay.
- A breakdown by program of any capital costs included in the pending GRC that exceed previously authorized levels or that have not been previously found to be reasonable.
FISCAL EFFECT:
No costs to the CPUC because, as the CPUC contends, the information this bill requires an IOU to provide as part of its GRC is already provided by the IOUs to the CPUC.
COMMENTS:
The California Constitution establishes the CPUC to, among other things, fix rates, establish rules, examine records, issue subpoenas, administer oaths, take testimony, punish for contempt and prescribe a uniform system of accounts for all public utilities subject to its jurisdiction. Such public utilities are commonly referred to as IOUs.
Existing state law—section 451 of the Public Resources Code—specifies the requirements of charges, such as rates, imposed by an IOU:
- All charges demanded or received by any public utility, or by any two or more public utilities, for any product or commodity furnished or to be furnished or any service rendered or to be rendered shall be just and reasonable. Every unjust or unreasonable charge demanded or received for such product or commodity or service is unlawful.
- Every public utility shall furnish and maintain such adequate, efficient, just, and reasonable service, instrumentalities, equipment and facilities, including telephone facilities, as defined in Section 54.1 of the Civil Code, as are necessary to promote the safety, health, comfort and convenience of its patrons, employees and the public.
- All rules made by a public utility affecting or pertaining to its charges or service to the public shall be just and reasonable.
It is the CPUC’s job to authorize an IOU to collect only those rates for service that are just and reasonable. The main process by which the CPUC fulfills this obligation is through each IOU’s GRC—a periodic (currently, every three years) review of costs of service the IOU requests the CPUC allow it to recover from the IOU’s customers, known as ratepayers. In the case of a large energy provider, like Pacific Gas and Electric or Southern California Gas, the GRC concerns billions of dollars, millions of customers, hundreds of documents and dozens of interested parties.
The author intends this bill to increase the transparency of the drivers of the costs paid by California IOU ratepayers. According to the author, “Californians pay some of the highest rates in the nation…Ratepayers deserve transparency—especially when they are the ones bearing the costs of grid improvements.”
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Discussed in Hearing
Senate Floor
Senate Standing Committee on Energy, Utilities and Communications
Bill Author
Bill Co-Author(s):