AB 1095: Data centers: waste heat energy.
- Session Year: 2025-2026
- House: Assembly
- Latest Version Date: 2025-04-21
Current Status:
Failed
(2026-02-02: From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
The Bergeson-Peace Infrastructure and Economic Development Bank Act establishes the California Infrastructure and Economic Development Bank (I-Bank) in the Governors Office of Business and Economic Development, governed by a board of directors. The act, among other things, authorizes the I-Bank to make loans, issue bonds, and provide financial assistance for various types of projects that qualify as economic development or public development facilities. The Climate Catalyst Revolving Loan Fund Act of 2020 authorizes the I-Bank, under the Climate Catalyst Revolving Loan Fund Program, to provide financial assistance to any eligible sponsor or participating party in connection with the financing or refinancing for eligible climate catalyst projects, as defined, either directly to the sponsor or participating party or to a lending or financial institution, as specified. The act, beginning in the 202122 fiscal year, requires the I-Bank to adopt a climate catalyst financing plan, as specified, after meeting and conferring with prescribed authorized consulting agencies concerning specific categories of climate catalyst projects. The act establishes the Climate Catalyst Revolving Loan Fund as a continuously appropriated fund for the purpose of implementing the objectives and provisions of the act.
This bill would authorize the I-Bank to provide financial assistance in connection with the financing or refinancing of an additional category of climate catalyst projects, those projects that enable the capture and conversion of data centers waste heat, with the State Energy Resources Conservation and Development Commission (Energy Commission) as the consulting agency. If multiple projects seek funding under this category of climate catalyst projects, the bill would require the consulting agencies to prioritize funding based on state policy and on financial considerations, as determined by the Energy Commission. By expanding the purposes for which moneys in the fund may be expended, the bill would make an appropriation.
Existing law vests the Public Utilities Commission with regulatory jurisdiction over public utilities, including electrical corporations, while local publicly owned electric utilities are under the direction of their governing board. The California Renewables Portfolio Standard Program requires the commission to establish a renewables portfolio standard requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources, as defined, so that the total kilowatthours of those products sold to their retail end-use customers achieves 25% of retail sales by December 31, 2016, 33% by December 31, 2020, 44% by December 31, 2024, 52% by December 31, 2027, and 60% by December 31, 2030. The program additionally requires each local publicly owned electric utility to procure a minimum quantity of electricity products from eligible renewable energy resources to achieve the procurement requirements established by the program.This bill would require that a data center, as defined, that generates waste heat energy, as defined, be eligible to receive renewable energy credits under the program for that waste heat energy if specified conditions are met, including that the waste heat energy is used at the same facility or location where the waste heat was generated, captured, and converted, as specified. The bill would also require that a data center that uses waste heat to provide heating for buildings be eligible to receive renewable energy credits pursuant to a metric, which the bill would require the State Energy Resources Conservation and Development Commission to develop, that awards credit based on the amount of energy usage avoided due to the use of waste heat for building heating, as provided.Existing law vests the Public Utilities Commission with regulatory jurisdiction over public utilities, including electrical corporations, while local publicly owned electric utilities are under the direction of their governing board. The California Renewables Portfolio Standard Program requires the commission to establish a renewables portfolio standard requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources, as defined, so that the total kilowatthours of those products sold to their retail end-use customers achieves 25% of retail sales by December 31, 2016, 33% by December 31, 2020, 44% by December 31, 2024, 52% by December 31, 2027, and 60% by December 31, 2030. The program additionally requires each local publicly owned electric utility to procure a minimum quantity of electricity products from eligible renewable energy resources to achieve the procurement requirements established by the program.
This bill would require that a data center, as defined, that generates waste heat energy, as defined, be eligible to receive renewable energy credits under the program for that waste heat energy if specified conditions are met, including that the waste heat energy is used at the same facility or location where the waste heat was generated, captured, and converted, as specified. The bill would also require that a data center that uses waste heat to provide heating for buildings be eligible to receive renewable energy credits pursuant to a metric, which the bill would require the State Energy Resources Conservation and Development Commission to develop, that awards credit based on the amount of energy usage avoided due to the use of waste heat for building heating, as provided.
Existing law provides that, before January 1, 1995, the use of State Plane Coordinates for new projects may be based on the California Coordinate System of 1927 or the California Coordinate System of 1983 and that, on or after January 1, 1995, when State Plane Coordinates are used on new surveys and new mapping projects, the use shall be limited to the California Coordinate System of 1983. Existing law also provides that, after, January 1, 2025, new surveys and mapping projects may be based on the California Coordinate System of 2022. This bill would make nonsubstantive changes to this provision.Existing law provides that, before January 1, 1995, the use of State Plane Coordinates for new projects may be based on the California Coordinate System of 1927 or the California Coordinate System of 1983 and that, on or after January 1, 1995, when State Plane Coordinates are used on new surveys and new mapping projects, the use shall be limited to the California Coordinate System of 1983. Existing law also provides that, after, January 1, 2025, new surveys and mapping projects may be based on the California Coordinate System of 2022.
This bill would make nonsubstantive changes to this provision.
(a)The bank is hereby authorized and empowered to provide financial assistance under the Climate Catalyst Revolving Loan Fund Program to any eligible sponsor or participating party either directly or to a lending or financial institution, in connection with the financing or refinancing of a climate catalyst project, in accordance with an agreement or agreements, between the bank and the sponsor or participating party, including, but not limited to, tribes, either as a sole lender or in participation or syndication with other lenders.
(b)Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 does not apply to any climate catalyst financing plan or any criteria, priorities, and guidelines adopted by the bank in connection with the Climate Catalyst Revolving Loan Fund Program or any other program of the bank. However, any climate catalyst financing plan shall be posted on the banks internet website in a conspicuous location at least 30 calendar days before a bank board meeting at which the climate catalyst financing plan will be considered for approval.
(c)(1)Repayments of financing made under the Climate Catalyst Revolving Loan Fund Program shall be deposited into the appropriate account created within the Climate Catalyst Revolving Loan Fund.
(2)The bank shall establish a separate account for each category of climate catalyst projects identified by each paragraph of subdivision (f). For purposes of paragraph (3) of subdivision (f), the Clean Energy Transmission Financing Account is hereby created in the Climate Catalyst Revolving Loan Fund.
(d)(1)(A)Beginning in the 202122 fiscal year, the bank shall meet and confer with the consulting agencies concerning the specific categories of climate catalyst project corresponding to each agency as provided in subdivision (f). Thereafter, the bank board shall adopt, by majority vote of the bank board, a climate catalyst financing plan. Before the bank board meeting in which the bank board will first consider adoption of the financing plan, each consulting agency shall submit a letter to the bank board discussing any areas of support and any areas of disagreement with the financing plan under consideration.
(B)Beginning in the 202324 fiscal year, adoption of a climate catalyst financing plan by the bank board shall authorize the bank to provide financial assistance and to use all financing authorities provided under this division in its implementation of a climate catalyst financing plan.
(2)Following bank board approval, the climate catalyst financing plan shall be posted on the banks internet website.
(3)If the bank board has not approved a climate catalyst financing plan, then a climate catalyst financing plan shall not be in effect until approved by the bank board.
(e)(1)A climate catalyst financing plan shall remain in effect until superseded by a revised climate catalyst financing plan. Commencing the first fiscal year following adoption of the initial climate catalyst financing plan, and in each fiscal year thereafter, the bank shall contact each consulting agency to discuss potential revisions to the climate catalyst financing plan last approved by the bank board. Following each consultation, the bank board shall consider adopting, by majority vote, a revised climate catalyst financing plan reflecting any material revisions to the prior climate catalyst financing plan.
(2)A modified climate catalyst financing plan shall only be considered for approval if no consulting agencies propose material revisions to the financing plan then in effect.
(3)If the bank board does not adopt a proposed revised climate catalyst financing plan, the existing climate catalyst financing plan shall remain in effect.
(f)Beginning with the 202122 fiscal year, the consulting agencies and corresponding areas of climate catalyst projects they will provide consultation on shall be as follows:
(1)The Natural Resources Agency for climate catalyst projects that relate to sustainable vegetation management, forestry practices, and timber harvesting products. Eligible climate catalyst project categories include, but are not limited to, all of the following:
(A)Clean energy production, except combustion biomass conversion.
(B)Advanced construction materials.
(C)Forestry equipment needed to achieve the states goals for forest and vegetation management treatments.
(2)The Department of Food and Agriculture for climate catalyst projects that relate to agricultural improvements that enhance the climate or lessen impacts to the climate resulting from in-force agricultural practices. Eligible climate catalyst project categories include, but are not limited to, all of the following:
(A)Onfarm and food processing renewable energy, including both electricity and fuels, and bioenergy, to be used or distributed onsite.
(B)Energy, water, and materials efficiency.
(C)Methane reduction projects, using best practice approaches consistent with state policy goals, excluding dairy digesters and biogas unless used or distributed onsite.
(D)Energy storage or microgrids.
(E)Equipment replacement.
(3)(A)The State Energy Resources Conservation and Development Commission and the Public Utilities Commission for climate catalyst projects that are clean energy transmission projects. If multiple projects seek funding, the consulting agencies shall prioritize, based on state policy, potential projects that meet the conditions in subparagraph (B), and on financial considerations as determined by the bank. Eligible climate catalyst project categories in this paragraph shall comply with the conditions set forth in this paragraph, and include, but are not limited to, both of the following:
(i)Clean energy transmission project infrastructure that is necessary to connect the transmission project into the applicable California balancing authority area.
(ii)Other necessary technical elements of transmission infrastructure, including including, but not limited to, environmental planning, permitting, and preconstruction costs for a project.
(B)The initial climate catalyst project or projects funded under this paragraph shall support the development of a new transmission line or transmission lines to deliver to the system operated by the Independent System Operator zero-carbon, firm electricity from new resources located in the Salton Sea region.
(C)Eligible projects shall meet all of the following conditions:
(i)Have at least one interconnection point within a California balancing authority area.
(ii)The applicant or its affiliates have previously completed a transmission project in California.
(iii)Will primarily deliver electricity to the Independent System Operator balancing authority area from clean resources located in identified resource areas that do not have adequate deliverability to a California balancing authority area.
(iv)Support new high voltage, defined as 200 kilovolts or higher, transmission projects or upgrades of existing transmission lines and substations to high voltage that are consistent with the states reliability and greenhouse gas policy objectives.
(v)Priority shall be given to transmission projects that have not already been approved through the Independent System Operators transmission planning process or projects that have not been recently studied in the Independent System Operators transmission planning process and found to be unneeded or uneconomical.
(vi)Financial considerations as determined by the bank.
(vii)Consistency with state policy as determined by the consulting agencies.
(D)The bank shall not finance a project unless the entity completing the transmission project has entered into a project labor agreement that, at a minimum, meets the requirements of Section 2500 of the Public Contract Code and includes all of the following:
(i)Provisions requiring payment of prevailing wages, in accordance with Article 1 (commencing with Section 1720) of Chapter 1 of Part 7 of Division 2 of the Labor Code, to all construction workers employed in the construction of the project and for enforcement of that obligation through an arbitration procedure.
(ii)Targeted hiring provisions, including a targeted hiring plan, on a craft-by-craft basis to address job access for local, disadvantaged, or underrepresented workers, as defined by a relevant local agency.
(iii)Apprenticeship utilization provisions that commit all parties to increasing the share of work performed by state-registered apprentices above the state-mandated minimum ratio required in Section 1777.5 of the Labor Code.
(iv)Apprenticeship utilization provisions that commit all parties to hiring and retaining a certain percentage of state-registered apprentices that have completed the Multi-Craft Core preapprenticeship training curriculum referenced in subdivision (t) of Section 14005 of the Unemployment Insurance Code.
(E)Consultation on a potential transmission project does not constitute approval of that project by the Public Utilities Commission or the State Energy Resources Conservation and Development Commission under their decisionmaking authority, if that authority exists.
(F)Consultation on, or evaluation of, a transmission project by the bank does not indicate the banks approval. The bank shall consider the credit and financial aspects of the project before determining whether to approve and finance the project.
(4)(A)The State Energy Resources Conservation and Development Commission or the Public Utilities Commission for climate catalyst projects to leverage federal financing funds that relate to projects that avoid, reduce, use, or sequester air pollutants or anthropogenic emissions of greenhouse gases as defined in Section 16513 of Title 42 of the United States Code, as amended.
(B)Projects described in subparagraph (A) shall not be funded until the United States Department of Energy is able to finance projects that do not meet the criteria in Section 16513(a)(2) of Title 42 of the United States Code. This subparagraph shall become inoperative on July 1, 2024.
(5)(A)The Governors Office of Business and Economic Development, Treasurers Office, State Energy Resources Conservation and Development Commission, California Environmental Protection Agency, State Air Resources Board, Public Utilities Commission, Natural Resources Agency, Department of Conservation, Department of Resources Recycling and Recovery, and other relevant agencies, as determined by these agencies, for climate catalyst projects to leverage federal funding available under the United States Environmental Protection Agencys Greenhouse Gas Reduction Fund (Section 7434 of Title 42 of the United States Code) and related implementing statutes and regulations.
(B)Eligible climate catalyst project categories shall comply with the climate and equity goals in the states climate change scoping plan developed pursuant to Section 38561 of the Health and Safety Code.
(6)The State Energy Resources Conservation and Development Commission for climate catalyst projects that enable the capture and conversion of data centers waste heat. If multiple projects seek funding, the consulting agencies shall prioritize funding based on state policy and on financial considerations, as determined by the State Energy Resources Conservation and Development Commission.
(g)(1)The bank may engage in outreach activities to inform disadvantaged participating parties and disadvantaged sponsors of the categories of financial assistance potentially available within the Climate Catalyst Revolving Loan Fund Program. The outreach efforts may include, but are not limited to, all of the following:
(A)Conferring with the consulting agencies.
(B)Conferring with the Governors Office of Business and Economic Development.
(C)Direct contact with existing bank clients and customers that operate within the boundaries of a disadvantaged community.
(D)Consulting with governmental entities, individuals, and business entities engaged in providing, or assisting the obtaining of, financial assistance for disadvantaged sponsors or participating parties, including, but not limited to, business and industrial development corporations and minority enterprise small business investment companies. The executive director, on behalf of the bank, may enter into service contracts for this purpose. Section 10295 and Article 4 (commencing with Section 10335) of Chapter 2 of Part 2 of Division 2 of the Public Contract Code do not apply to those service contracts.
(2)The criteria, priorities, and guidelines adopted for the Climate Catalyst Revolving Loan Fund Program may include potential options for applying interest rate or fee subsidies for disadvantaged participating parties or disadvantaged sponsors seeking financial assistance from the bank under the Climate Catalyst Revolving Loan Fund Program. The bank may offer reduced application fees to disadvantaged sponsors or participating parties seeking financial assistance under the Climate Catalyst Revolving Loan Fund Program.
(3)The bank may offer technical assistance to disadvantaged sponsors or participating parties potentially seeking financial assistance under the Climate Catalyst Revolving Loan Fund Program. The executive director, on behalf of the bank, may enter into service contracts to provide, or assist with the provision of, the technical assistance. Section 10295 and Article 4 (commencing with Section 10335) of Chapter 2 of Part 2 of Division 2 of the Public Contract Code do not apply to those service contracts.
(h)All financial assistance under the Climate Catalyst Revolving Loan Fund Program approved by the bank board shall be consistent with the climate catalyst financing plan then in effect.
(i)(1)The bank shall prepare, and the bank board shall approve by majority vote of the board, criteria, priorities, and guidelines for the provision of financial assistance under the Climate Catalyst Revolving Loan Fund Program. The bank boards approval of any financial assistance for a climate catalyst project shall take into consideration those criteria, priorities, and guidelines together with the climate catalyst financing plan currently in effect. The criteria, priorities, and guidelines shall include, as factors for determining whether to approve the provision of financial assistance, the ability of the sponsor or participating party potentially receiving financial assistance to satisfy any obligation incurred and the return of capital to the Climate Catalyst Revolving Loan Fund.
(2)The bank board may consider additional factors when determining whether to approve financial assistance for a climate catalyst project, taking into consideration the climate catalyst financing plan.
(3)The bank shall consider applications for financial assistance as they are received, on an ongoing basis, if there are available moneys remaining within the Climate Catalyst Revolving Loan Fund to provide that financial assistance. The bank boards determination of whether to approve applications for financial assistance shall be based on the climate catalyst financing plan in effect at the time the bank received the application.
(j)The bank shall provide financial assistance only for climate catalyst projects that the bank board approved before July 1, 2025.
(k)The bank is hereby authorized and empowered to enter into an agreement with the consulting agencies, or any other state agency as approved by the banks board, to operate a program to provide financial assistance to any eligible sponsor or participating party either directly or to a lending or financial institution, in connection with the financing or refinancing of an eligible project, in accordance with such agreement or agreements. Information shared among consulting agencies and the bank, or between any consulting agency and the bank, does not constitute the waiver of any Public Records Act exemption applicable to each entity.
SECTION 1.Section 399.12 of the Public Utilities Code is amended to read:399.12.For purposes of this article, the following terms have the following meanings:(a)Conduit hydroelectric facility means a facility for the generation of electricity that uses only the hydroelectric potential of an existing pipe, ditch, flume, siphon, tunnel, canal, or other manmade conduit that is operated to distribute water for a beneficial use.(b)Balancing authority means the responsible entity that integrates resource plans ahead of time, maintains load-interchange generation balance within a balancing authority area, and supports interconnection frequency in real time.(c)Balancing authority area means the collection of generation, transmission, and loads within the metered boundaries of the area within which the balancing authority maintains the electrical load-resource balance.(d)California balancing authority means a balancing authority with control over a balancing authority area primarily located in this state and operating for retail sellers and local publicly owned electric utilities subject to the requirements of this article and includes the Independent System Operator (ISO) and a local publicly owned electric utility operating a transmission grid that is not under the operational control of the ISO. A California balancing authority is responsible for the operation of the transmission grid within its metered boundaries, which is not limited by the political boundaries of the State of California.(e)Eligible renewable energy resource means an electrical generating facility that meets the definition of a renewable electrical generation facility in Section 25741 of the Public Resources Code, subject to the following:(1)(A)An existing small hydroelectric generation facility of 30 megawatts or less shall be eligible only if a retail seller or local publicly owned electric utility procured the electricity from the facility as of December 31, 2005. A new hydroelectric facility that commences generation of electricity after December 31, 2005, is not an eligible renewable energy resource if it will cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.(B)Notwithstanding subparagraph (A), a conduit hydroelectric facility of 30 megawatts or less that commenced operation before January 1, 2006, is an eligible renewable energy resource. A conduit hydroelectric facility of 30 megawatts or less that commences operation after December 31, 2005, is an eligible renewable energy resource if it does not cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.(C)A facility approved by the governing board of a local publicly owned electric utility before June 1, 2010, for procurement to satisfy renewable energy procurement obligations adopted pursuant to former Section 387, shall be certified as an eligible renewable energy resource by the Energy Commission pursuant to this article, if the facility is a renewable electrical generation facility as defined in Section 25741 of the Public Resources Code.(D)(i)A small hydroelectric generation unit with a nameplate capacity not exceeding 40 megawatts that is operated as part of a water supply or conveyance system is an eligible renewable energy resource only for the retail seller or local publicly owned electric utility that procured the electricity from the unit as of December 31, 2005. A unit shall not be eligible pursuant to this subparagraph if an application for certification is submitted to the Energy Commission after January 1, 2013. Only one retail seller or local publicly owned electric utility shall be deemed to have procured electricity from a given unit as of December 31, 2005.(ii)Notwithstanding clause (i), a local publicly owned electric utility that meets the criteria of subdivision (j) of Section 399.30 may sell to another local publicly owned electric utility electricity from small hydroelectric generation units that qualify as eligible renewable energy resources under clause (i), and that electricity may be used by the local publicly owned electric utility that purchased the electricity to meet its renewables portfolio standard procurement requirements. The total of all those sales from the utility shall be no greater than 100,000 megawatthours of electricity.(iii)The amendments made to this subdivision by the act adding this subparagraph are intended to clarify existing law and apply from December 10, 2011.(2)(A)A facility engaged in the combustion of municipal solid waste shall not be considered an eligible renewable energy resource.(B)Subparagraph (A) does not apply to generation before January 1, 2017, from a facility located in the County of Stanislaus that was operational before September 26, 1996.(f)Procure means to acquire through ownership or contract.(g)Procurement entity means a person or corporation authorized by the commission to enter into contracts to procure eligible renewable energy resources on behalf of customers of a retail seller pursuant to subdivision (f) of Section 399.13.(h)(1)Renewable energy credit means a certificate of proof associated with the generation of electricity from an eligible renewable energy resource, issued through the accounting system established by the Energy Commission pursuant to Section 399.25, that one unit of electricity was generated and delivered by an eligible renewable energy resource.(2)Renewable energy credit includes all renewable and environmental attributes associated with the production of electricity from the eligible renewable energy resource, except for an emissions reduction credit issued pursuant to Section 40709 of the Health and Safety Code and credits or payments associated with the reduction of solid waste and treatment benefits created by the utilization of biomass or biogas fuels.(3)(A)Electricity generated by an eligible renewable energy resource attributable to the use of nonrenewable fuels, beyond a de minimis quantity used to generate electricity in the same process through which the facility converts renewable fuel to electricity, shall not result in the creation of a renewable energy credit. The Energy Commission shall set the de minimis quantity of nonrenewable fuels for each renewable energy technology at a level of no more than 2 percent of the total quantity of fuel used by the technology to generate electricity. The Energy Commission may adjust the de minimis quantity for an individual facility, up to a maximum of 5 percent, if it finds that all of the following conditions are met:(i)The facility demonstrates that the higher quantity of nonrenewable fuel will lead to an increase in generation from the eligible renewable energy facility that is significantly greater than generation from the nonrenewable fuel alone.(ii)The facility demonstrates that the higher quantity of nonrenewable fuels will reduce the variability of its electrical output in a manner that results in net environmental benefits to the state.(iii)The higher quantity of nonrenewable fuel is limited to either natural gas or hydrogen derived by reformation of a fossil fuel.(B)Electricity generated by a small hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (A) or (D) of paragraph (1) of subdivision (e).(C)Electricity generated by a conduit hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (B) of paragraph (1) of subdivision (e).(D)Electricity generated by a facility engaged in the combustion of municipal solid waste shall not result in the creation of a renewable energy credit. This subparagraph does not apply to renewable energy credits that were generated before January 1, 2017, by a facility engaged in the combustion of municipal solid waste located in the County of Stanislaus that was operational before September 26, 1996, and sold pursuant to contacts entered into before January 1, 2017.(i)Renewables portfolio standard means the specified percentage of electricity generated by eligible renewable energy resources that a retail seller or a local publicly owned electric utility is required to procure pursuant to this article.(j)Retail seller means an entity engaged in the retail sale of electricity to end-use customers located within the state, including any of the following:(1)An electrical corporation.(2)A community choice aggregator. A community choice aggregator shall participate in the renewables portfolio standard program subject to the same terms and conditions applicable to an electrical corporation.(3)An electric service provider. The electric service provider shall be subject to the same terms and conditions applicable to an electrical corporation pursuant to this article. This paragraph does not impair a contract entered into between an electric service provider and a retail customer before the suspension of direct access by the commission pursuant to Section 80110 of the Water Code.(4)Retail seller does not include any of the following:(A)A corporation or person employing cogeneration technology or producing electricity consistent with subdivision (b) of Section 218.(B)The Department of Water Resources acting in its capacity pursuant to Division 27 (commencing with Section 80000) of the Water Code.(C)A local publicly owned electric utility.(k)Waste heat means the heat that is produced as a byproduct of a machine process or other process that uses energy.(l)Waste heat energy means the electricity that is generated from the capture and conversion of waste heat.(m)WECC means the Western Electricity Coordinating Council of the North American Electric Reliability Corporation, or a successor to the corporation.SEC. 2.Section 399.34 is added to the Public Utilities Code, immediately following Section 399.33, to read:399.34.(a)For purposes of this section, both of the following definitions apply:(1)Data center means a facility that houses computing infrastructure, including graphics and central processing units, servers, storage devices, networking equipment, and associated power and cooling systems, for the primary purpose of processing, storing, or distributing electronic data.(2)Eligible end user means a data center.(b)An eligible end user that generates waste heat energy by means of thermoelectric conversion, thermionic conversion, or thermovoltaic conversion shall receive renewable energy credits based on the amount of electricity generated pursuant to this article for that waste heat energy if both of the following conditions are met: (1)The eligible end user demonstrates the capture and conversion of waste heat to electricity.(2)The waste heat energy is used at the same facility or location where the waste heat was generated, captured, and converted.(c)Notwithstanding subdivision (b), an eligible end user that uses waste heat to provide heating for buildings is eligible to receive renewable energy credits pursuant to a metric the Energy Commission shall develop that issues renewable energy credits based on the amount of energy usage avoided due to the use of the waste heat for building heating.(d)Renewable energy credits shall be issued by the commission or the Energy Commission.(e)An eligible end user may use renewable energy credits received pursuant to this section to satisfy their own renewable energy procurement requirements or may sell or transfer the renewable energy credits to utilities or other entities in accordance with rules or regulations adopted pursuant to this article.(f)The renewable energy credits issued to an eligible end user pursuant to this section shall be tracked and verified using the same systems and procedures that apply to other eligible renewable energy resources under this article to ensure proper accounting and prevent double counting.(g)Eligible end users that generate waste heat energy shall report the amount of electricity produced, the method of generation, and relevant greenhouse gas emission reductions to the commission and the Energy Commission as required under rules or regulations adopted pursuant to this article.For purposes of this article, the following terms have the following meanings:
(a)Conduit hydroelectric facility means a facility for the generation of electricity that uses only the hydroelectric potential of an existing pipe, ditch, flume, siphon, tunnel, canal, or other manmade conduit that is operated to distribute water for a beneficial use.
(b)Balancing authority means the responsible entity that integrates resource plans ahead of time, maintains load-interchange generation balance within a balancing authority area, and supports interconnection frequency in real time.
(c)Balancing authority area means the collection of generation, transmission, and loads within the metered boundaries of the area within which the balancing authority maintains the electrical load-resource balance.
(d)California balancing authority is means a balancing authority with control over a balancing authority area primarily located in this state and operating for retail sellers and local publicly owned electric utilities subject to the requirements of this article and includes the Independent System Operator (ISO) and a local publicly owned electric utility operating a transmission grid that is not under the operational control of the ISO. A California balancing authority is responsible for the operation of the transmission grid within its metered boundaries boundaries, which is not limited by the political boundaries of the State of California.
(e)Eligible renewable energy resource means an electrical generating facility that meets the definition of a renewable electrical generation facility in Section 25741 of the Public Resources Code, subject to the following:
(1)(A)An existing small hydroelectric generation facility of 30 megawatts or less shall be eligible only if a retail seller or local publicly owned electric utility procured the electricity from the facility as of December 31, 2005. A new hydroelectric facility that commences generation of electricity after December 31, 2005, is not an eligible renewable energy resource if it will cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(B)Notwithstanding subparagraph (A), a conduit hydroelectric facility of 30 megawatts or less that commenced operation before January 1, 2006, is an eligible renewable energy resource. A conduit hydroelectric facility of 30 megawatts or less that commences operation after December 31, 2005, is an eligible renewable energy resource so long as if it does not cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(C)A facility approved by the governing board of a local publicly owned electric utility prior to before June 1, 2010, for procurement to satisfy renewable energy procurement obligations adopted pursuant to former Section 387, shall be certified as an eligible renewable energy resource by the Energy Commission pursuant to this article, if the facility is a renewable electrical generation facility as defined in Section 25741 of the Public Resources Code.
(D)(i)A small hydroelectric generation unit with a nameplate capacity not exceeding 40 megawatts that is operated as part of a water supply or conveyance system is an eligible renewable energy resource only for the retail seller or local publicly owned electric utility that procured the electricity from the unit as of December 31, 2005. No A unit shall not be eligible pursuant to this subparagraph if an application for certification is submitted to the Energy Commission after January 1, 2013. Only one retail seller or local publicly owned electric utility shall be deemed to have procured electricity from a given unit as of December 31, 2005.
(ii)Notwithstanding clause (i), a local publicly owned electric utility that meets the criteria of subdivision (j) of Section 399.30 may sell to another local publicly owned electric utility electricity from small hydroelectric generation units that qualify as eligible renewable energy resources under clause (i), and that electricity may be used by the local publicly owned electric utility that purchased the electricity to meet its renewables portfolio standard procurement requirements. The total of all those sales from the utility shall be no greater than 100,000 megawatthours of electricity.
(iii)The amendments made to this subdivision by the act adding this subparagraph are intended to clarify existing law and apply from December 10, 2011.
(2)(A)A facility engaged in the combustion of municipal solid waste shall not be considered an eligible renewable energy resource.
(B)Subparagraph (A) does not apply to generation before January 1, 2017, from a facility located in the County of Stanislaus County that was operational prior to before September 26, 1996.
(f)Procure means to acquire through ownership or contract.
(g)Procurement entity means any a person or corporation authorized by the commission to enter into contracts to procure eligible renewable energy resources on behalf of customers of a retail seller pursuant to subdivision (f) of Section 399.13.
(h)(1)Renewable energy credit means a certificate of proof associated with the generation of electricity from an eligible renewable energy resource, issued through the accounting system established by the Energy Commission pursuant to Section 399.25, that one unit of electricity was generated and delivered by an eligible renewable energy resource.
(2)Renewable energy credit includes all renewable and environmental attributes associated with the production of electricity from the eligible renewable energy resource, except for an emissions reduction credit issued pursuant to Section 40709 of the Health and Safety Code and any credits or payments associated with the reduction of solid waste and treatment benefits created by the utilization of biomass or biogas fuels.
(3)(A)Electricity generated by an eligible renewable energy resource attributable to the use of nonrenewable fuels, beyond a de minimis quantity used to generate electricity in the same process through which the facility converts renewable fuel to electricity, shall not result in the creation of a renewable energy credit. The Energy Commission shall set the de minimis quantity of nonrenewable fuels for each renewable energy technology at a level of no more than 2 percent of the total quantity of fuel used by the technology to generate electricity. The Energy Commission may adjust the de minimis quantity for an individual facility, up to a maximum of 5 percent, if it finds that all of the following conditions are met:
(i)The facility demonstrates that the higher quantity of nonrenewable fuel will lead to an increase in generation from the eligible renewable energy facility that is significantly greater than generation from the nonrenewable fuel alone.
(ii)The facility demonstrates that the higher quantity of nonrenewable fuels will reduce the variability of its electrical output in a manner that results in net environmental benefits to the state.
(iii)The higher quantity of nonrenewable fuel is limited to either natural gas or hydrogen derived by reformation of a fossil fuel.
(B)Electricity generated by a small hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (A) or (D) of paragraph (1) of subdivision (e).
(C)Electricity generated by a conduit hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (B) of paragraph (1) of subdivision (e).
(D)Electricity generated by a facility engaged in the combustion of municipal solid waste shall not result in the creation of a renewable energy credit. This subparagraph does not apply to renewable energy credits that were generated before January 1, 2017, by a facility engaged in the combustion of municipal solid waste located in the County of Stanislaus County that was operational prior to before September 26, 1996, and sold pursuant to contacts entered into before January 1, 2017.
(i)Renewables portfolio standard means the specified percentage of electricity generated by eligible renewable energy resources that a retail seller or a local publicly owned electric utility is required to procure pursuant to this article.
(j)Retail seller means an entity engaged in the retail sale of electricity to end-use customers located within the state, including any of the following:
(1)An electrical corporation, as defined in Section 218. corporation.
(2)A community choice aggregator. A community choice aggregator shall participate in the renewables portfolio standard program subject to the same terms and conditions applicable to an electrical corporation.
(3)An electric service provider, as defined in Section 218.3. provider. The electric service provider shall be subject to the same terms and conditions applicable to an electrical corporation pursuant to this article. This paragraph does not impair a contract entered into between an electric service provider and a retail customer prior to before the suspension of direct access by the commission pursuant to Section 80110 of the Water Code.
(4)Retail seller does not include any of the following:
(A)A corporation or person employing cogeneration technology or producing electricity consistent with subdivision (b) of Section 218.
(B)The Department of Water Resources acting in its capacity pursuant to Division 27 (commencing with Section 80000) of the Water Code.
(C)A local publicly owned electric utility.
(k)Waste heat means the heat that is produced as a byproduct of a machine process or other process that uses energy.
(l)Waste heat energy means the electricity that is generated from the capture and conversion of waste heat.
(k)(m)WECC means the Western Electricity Coordinating Council of the North American Electric Reliability Corporation, or a successor to the corporation.
SEC. 2.Section 399.34 is added to the Public Utilities Code, immediately following Section 399.33, to read:399.34.(a)For purposes of this section, both of the following definitions apply:
(1)Data center means a facility that houses computing infrastructure, including graphics and central processing units, servers, storage devices, networking equipment, and associated power and cooling systems, for the primary purpose of processing, storing, or distributing electronic data.
(2)Eligible end user means a data center.
(b)An eligible end user that generates waste heat energy by means of thermoelectric conversion, thermionic conversion, or thermovoltaic conversion shall receive renewable energy credits based on the amount of electricity generated pursuant to this article for that waste heat energy if both of the following conditions are met:
(1)The eligible end user demonstrates the capture and conversion of waste heat to electricity.
(2)The waste heat energy is used at the same facility or location where the waste heat was generated, captured, and converted.
(c)Notwithstanding subdivision (b), an eligible end user that uses waste heat to provide heating for buildings is eligible to receive renewable energy credits pursuant to a metric the Energy Commission shall develop that issues renewable energy credits based on the amount of energy usage avoided due to the use of the waste heat for building heating.
(d)Renewable energy credits shall be issued by the commission or the Energy Commission.
(e)An eligible end user may use renewable energy credits received pursuant to this section to satisfy their own renewable energy procurement requirements or may sell or transfer the renewable energy credits to utilities or other entities in accordance with rules or regulations adopted pursuant to this article.
(f)The renewable energy credits issued to an eligible end user pursuant to this section shall be tracked and verified using the same systems and procedures that apply to other eligible renewable energy resources under this article to ensure proper accounting and prevent double counting.
(g)Eligible end users that generate waste heat energy shall report the amount of electricity produced, the method of generation, and relevant greenhouse gas emission reductions to the commission and the Energy Commission as required under rules or regulations adopted pursuant to this article.
SECTION 1.Section 8817 of the Public Resources Code is amended to read:8817.Before January 1, 1995, use of State Plane Coordinates for new projects may be based either on CCS27 or CCS83. On or after January 1, 1995, when State Plane Coordinates are used on new surveys and new mapping projects, the use shall be limited to CCS83. However, this section does not preclude a survey from retracement of a CCS27 survey. After January 1, 2025, new surveys and mapping projects may be based upon CCS2022.Prior to Before January 1, 1995, use of State Plane Coordinates for new projects may be based either on CCS27 or CCS83. On or after January 1, 1995, when State Plane Coordinates are used on new surveys and new mapping projects, the use shall be limited to CCS83. However, this section does not preclude a survey from retracement of a CCS27 survey. After January 1 1, 2025, new surveys and mapping projects may be based upon CCS2022.
|
Date
|
Status
|
|---|---|
| Feb 2, 2026 | From committee: Filed with the Chief Clerk pursuant to Joint Rule 56. |
| Jan 31, 2026 | Died pursuant to Art. IV, Sec. 10(c) of the Constitution. |
| May 23, 2025 | In committee: Held under submission. |
| May 14, 2025 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| Apr 29, 2025 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 14. Noes 0.) (April 28). Re-referred to Com. on APPR. |
| Apr 24, 2025 | From committee: Do pass and re-refer to Com. on NAT. RES. with recommendation: To Consent Calendar. (Ayes 18. Noes 0.) (April 23). Re-referred to Com. on NAT. RES. |
| Apr 22, 2025 | Re-referred to Com. on U. & E. |
| Apr 21, 2025 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Mar 26, 2025 | Re-referred to Com. on U. & E. |
| Mar 25, 2025 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Mar 24, 2025 | Referred to Coms. on U. & E. and NAT. RES. |
| Feb 21, 2025 | From printer. May be heard in committee March 23. |
| Feb 20, 2025 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Apr 28, 2025 | Do pass and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar | Assembly Standing Committee on Natural Resources |
Passed |
|
| Apr 23, 2025 | Do pass and be re-referred to the Committee on [Natural Resources] with recommendation: To Consent Calendar | Assembly Standing Committee on Utilities and Energy |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| The Utility Reform Network – submitted for a prior version of the measure | ** Against |
Date of Hearing: May 14, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 1095
Author:(Papan) – As Amended Ver:April 21, 2025
Policy Committee: | Utilities and Energy | Vote: | 18 - 0 |
Natural Resources | 14 - 0 | ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill makes projects that enable the capture and conversion of data centers’ waste heat eligible for funding through the California Infrastructure and Economic Development Bank (IBank) Climate Catalyst Revolving Loan Fund Program and designates the California Energy Commission (CEC) as the consulting agency for such projects. The bill also provides that, if multiple projects seek funding, the agencies making funding decisions are to prioritize funding based on state policy and on financial considerations, as determined by the CEC.
FISCAL EFFECT:
This bill creates significant cost pressure, possibly in the millions of dollars, on the Climate Catalyst Revolving Loan Fund Program to accommodate the new category of eligible funding.
COMMENTS:
- Purpose. This bill is to encourage the productive use of waste heat generated by data centers, thereby offsetting energy use. According to the author:
With data centers accounting for a significant portion of the state’s energy consumption and their waste heat largely going untapped, AB 1095 provides an innovative solution by encouraging the recycling of this otherwise wasted energy. By supporting investment in projects where data center operators repurpose their waste heat, this bill not only incentivizes energy efficiency but also aligns with California’s broader climate goals of decarbonization and reducing greenhouse gas emissions. The proposal is timely, as it aligns with the growing demand for cloud services and regenerative AI technologies, ensuring that California remains at the forefront of clean energy advancement while effectively addressing the energy needs of the future.
- Background. The statute governing the IBank’s Climate Catalyst Program directs it to provide financial assistance for climate catalyst projects at low-interest rates and at low-cost as determined by the bank, to support the projects directly and to attract additional third-party capital. Statute defines a “climate catalyst project” as any building, structure, equipment, infrastructure, or other improvement within California, or financing the general needs of any sponsor or participating party for operations or activities within California that are consistent with, and intended to, further California’s climate goals, activities that reduce climate risk, and the implementation of low-carbon technology and infrastructure. The definition of “climate catalyst project” is broad and, presumably, encompasses data center waste heat capture and conversion.
The IBank notes that monies from the federal Inflation Reduction Act of 2022 that were to fund the Climate Catalyst Revolving Loan Fund Program remain frozen and are unavailable for deployment, as ordered by the United States Court of Appeals for the District of Columbia Circuit on April 16, 2025. The IBank further notes that, in the absence of federal funds, the Legislature could make approximately $100 million available to the IBank to capitalize the Climate Catalyst Revolving Loan Fund Program.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: April 28, 2025
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Isaac G. Bryan, Chair
ABPCA Bill Id:AB 1095 (
Author:Papan) – As Amended Ver:April 21, 2025
SUBJECT: Data centers: waste heat energy
SUMMARY: Makes projects that capture and convert data centers’ waste heat eligible for the Climate Catalyst program administered by the Infrastructure and Economic Development Bank (I-Bank).
EXISTING LAW establishes the Climate Catalyst Revolving Loan Fund Program at the I-Bank and prescribes which projects are eligible for funding within the program. (Government Code 63048.91 et seq.)
THIS BILL adds to the Climate Catalyst Fund projects that enable the capture and conversion of data centers’ waste heat.
FISCAL EFFECT: Unknown
COMMENTS:
- Background. Thermal energy storage is a technology that stores thermal energy, or heat, for use at a later time. There are several ways that thermal energy can be stored for later use, including changing temperature of a specific material like steel slag or volcanic rock that retains the heat, or by performing a chemical reaction that can release energy at a later time. These types of technology can enable industrial waste heat recovery. Thermal energy storage technologies have the possibility to be implemented across multiple industries.
Data centers are facilities that house large volumes of high-performance computers, storage systems, and computing infrastructure. They are crucial for maintaining internet-based communications and providing certain services, including virtually all cloud-based computing. These systems require continuous power and cooling, which requires a substantial amount of electricity. According to the U.S. Department of Energy, data centers consume 10 to 50 times more energy than similarly sized commercial office buildings. The California Energy Commission estimated that data centers accounted for 2% of California’s electricity demand in 2019. Since then, the technology sector has seen a boom in artificial intelligence (AI) and a corresponding growth in load. As a result, grid planners expect electricity consumption by data centers to accelerate more rapidly over the next five years and beyond.
The Climate Catalyst Program was established by AB 78 (Chapter 10, Statutes of 2020), a budget trailer bill. The program authorizes the I-Bank to provide financial support for infrastructure projects that work toward the state’s climate goals. The Climate Catalyst fund is available to a variety of projects that further the state’s climate goals.
- Author’s statement:
AB 1095 is a pivotal step toward enhancing California’s clean energy innovation. This bill will make data centers that pursue waste heat conversion technologies eligible for financing under the state’s Climate Catalyst Program. With data centers accounting for a significant portion of the state’s energy consumption and their waste heat largely going untapped, AB 1095 provides an innovative solution by encouraging the recycling of this otherwise wasted energy. By supporting investment in projects where data center operators repurpose their waste heat, this bill not only incentivizes energy efficiency but also aligns with California’s broader climate goals of decarbonization and reducing greenhouse gas emissions. The proposal is timely, as it aligns with the growing demand for cloud services and regenerative AI technologies, ensuring that California remains at the forefront of clean energy advancement while effectively addressing the energy needs of the future.
- Double referral. This was heard in the Utilities and Energy Committee on April 23 and passed by a vote of 18-0.
REGISTERED SUPPORT / OPPOSITION:
Support
None on file
Opposition
None on file
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
Date of Hearing: April 23, 2025
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
ABPCA Bill Id:AB 1095 (
Author:Papan) – As Amended Ver:April 21, 2025
SUBJECT: Data centers: waste heat energy
SUMMARY: Qualifies waste heat capture and conversion technologies used at data centers for the Climate Catalyst Program administered by the California Infrastructure and Economic Development Bank (IBank).
EXISTING LAW:
- California Global Warming Solutions Act of 2006, directs the California Air Resources Board (CARB) to achieve emissions reductions and to complete a scoping plan for achieving those reductions. (Health and Safety Code § 38560)
- Creates the Climate Catalyst Revolving Loan Fund Program at the IBank and prescribes which projects are eligible for funding within the program. (Government Code §§ 63048.9-63048.100)
- Establishes the Waste Heat and Carbon Emissions Reduction Act, which aims to promote the development of efficient combined heat and power systems that utilize waste heat to generate electricity and thermal energy. Encourages CHP systems with a generating capacity of up to 20 megawatts, provided they meet specific efficiency and emissions standards. (Public Utilities Code §§ 2840–2843)
FISCAL EFFECT: Unknown. This bill is keyed fiscal, and will be referred to the Assembly Committee on Appropriations for its review.
CONSUMER COST IMPACTS: Unknown, likely negligible for the broader population.
BACKGROUND:
What is Waste Heat Recovery? – Waste heat recovery is the process of capturing and reusing the heat generated in industrial processes that would otherwise be lost to the environment. This approach enhances energy efficiency and reduces fuel consumption, leading to cost savings and lower greenhouse gas emissions. Waste heat can be recovered from sources such as exhaust gases from furnaces, gas turbines, and engines, as well as from cooling water and other heated industrial streams. Implementing waste heat recovery systems has become increasingly important in energy-intensive industries like cement, steel, glass, and chemical manufacturing, where significant energy losses occur.[1] Beyond environmental benefits, waste heat recovery contributes to improved sustainability and competitiveness in industrial operations.[2]
How do Data Centers and Artificial Intelligence Use Energy? – Data centers are facilities that house large volumes of high-performance computers, information technology, storage systems, and computing infrastructure. They are crucial for maintaining internet-based communications and providing services such as cloud-based computing, training and inference of artificial intelligence algorithms, as well as mining for cryptocurrency. There are multiple parts of the data center that consume energy, with the primary consumption found in the servers and storage, as well as the cooling system, as shown in Figure 1.[3]
Artificial intelligence (AI) models are trained on datasets to recognize certain patterns and make decisions without human intervention. This training can take anywhere from hours, up to months. To generate more sophisticated models, the size of the datasets increase, as does the demand for computational resources (measured in floating point operations per second or FLOPS). As training compute demand grows, the need for larger data centers and the requirement for more energy grows as well.
Figure 1: Parts of a data center that use energy.3
Current predictions around growth in AI and data centers have led some to believe that there is an inappropriate hysteria around the future energy demands in the industry. Some scholars note that similar concerns were voiced in the 1990s but that technological advances prevented the predicted energy crunch.[4],[5] Advances in efficiency are likely to change the AI landscape through new model design, innovations in chip and hardware efficiency, and better cooling technologies.[6],[7],[8],[9] The release of the AI model DeepSeek, which required significantly less computing power to train, supports the possibility that energy costs in training AI may not continue to grow as expected.[10] Recent studies have also shown that if demand response and load flexibility programs are implemented at data centers, peak loads on the grid can be avoided.[11]
Barriers to Data Center Waste Heat Recovery – Data centers consume vast amounts of electricity, much of which is converted into heat that is typically expelled through cooling systems. Instead of wasting this thermal energy, waste heat recovery systems can redirect it for useful purposes such as heating nearby buildings, providing hot water, or powering absorption chillers for additional cooling at the data center. For example, district heating networks can integrate recovered heat from data centers to supply residential or commercial heating, significantly reducing reliance on fossil fuels. [12] With increasing global demand for digital services, optimizing data center energy use through waste heat recovery not only lowers operational costs but could also contribute to climate goals by reducing total carbon emissions.[13]
Carbon Catalyst Program – The Carbon Catalyst Program is intended to provide financial support for infrastructure projects that work toward the State’s climate goals. The Climate Catalyst Act,[14] passed in 2020, established the Climate Catalyst Revolving Loan Fund to be administered by IBank. This fund is available to Climate Catalyst Projects, defined broadly as any in-state improvement that furthers the state’s climate goals.[15] Statute has added specificity to this broad mandate by identifying sustainable vegetation management and forestry practices,[16] agricultural improvements,[17] electric transmission projects,[18] and projects that can draw down federal dollars[19] as eligible funding recipients. As of January 23, 2025, the U.S. Environmental Protection Agency deposited $446,257,500 into the Climate Catalyst Fund at IBank as part of the federal Inflation Reduction Act of 2022.
COMMENTS:
- Author’s Statement. According to the author, “Assembly Bill (AB) 1095 is a pivotal step toward enhancing California’s clean energy innovation. This bill will make data centers that pursue waste heat conversion technologies eligible for financing under the state’s Climate Catalyst Program. With data centers accounting for a significant portion of the state’s energy consumption and their waste heat largely going untapped, AB 1095 provides an innovative solution by encouraging the recycling of this otherwise wasted energy. By supporting investment in projects where data center operators repurpose their waste heat, this bill not only incentivizes energy efficiency but also aligns with California’s broader climate goals of decarbonization and reducing greenhouse gas emissions. The proposal is timely, as it aligns with the growing demand for cloud services and regenerative AI technologies, ensuring that California remains at the forefront of clean energy advancement while effectively addressing the energy needs of the future.”
- Purpose of Bill. According to the author, there are over 300 data centers in California supporting nearly all business and government entities. Data centers store, process, and disseminate information critical to daily operations. Data centers in California are estimated to consume approximately 2% of the state’s total electricity demand, according to a 2024 report by the California Energy Commission.[20] However, some analyses suggest this figure could be as high as 10%, particularly in regions with high concentrations of data centers.[21] For instance, in Santa Clara, CA – a major hub for data centers – over 50 server farms consume about 60% of the city’s electricity.[22]
As noted above, much of data center energy consumption is converted into heat that is typically expelled through cooling systems. Instead of wasting this thermal energy, waste heat recovery systems can redirect it for useful purposes. However, one of the primary barriers to the widespread adoption of waste heat recovery in data centers is the high capital cost associated with implementing the necessary infrastructure. Installing heat exchangers, piping systems, thermal storage units, and distribution networks – especially for integration with district heating systems – requires significant upfront investment. Additionally, many data centers are not located near facilities that can readily use the recovered heat, which increases the cost of transporting thermal energy over long distances and may require retrofitting existing buildings or constructing entirely new heat networks.[23] Furthermore, the typically low-grade nature of waste heat from data centers, often below 40°C, limits its direct usability without further boosting via heat pumps, which adds both capital and operational costs. The return on investment for waste heat recovery in data centers can be slow, especially in regions with low energy prices or where regulatory incentives for energy reuse are lacking.[24] For these reasons, other efficiency measures – such as improved cooling or software solutions[25] – are often prioritized over waste heat recovery applications.
This bill seeks to provide a financial motivation to encourage waste heat recovery applications, by adding its usage in data centers as eligible technologies within the statewide Climate Catalyst Program. As of January 23, 2025, that program had almost $450 million available, as noted above.
- Related Legislation.
AB 222 (Bauer-Kahan, 2025) among its provisions, mandates that developers of artificial intelligence models report the energy used to train the model, and mandates data centers to report energy usage to the California Energy Commission (CEC). It establishes the authority of the CEC to implement efficiency requirements on data centers in the state. Status: In the Assembly Committee on Privacy and Consumer Protection after passage in this committee on April 2, 2025 on a 13-5-0 vote.
AB 1280 (Garcia, 2025) qualifies thermal energy storage, including waste heat recovery, for multiple financial incentive programs administered by the IBank, including the Climate Catalyst Program. Requires the CEC to expand programmatic language to include project labor agreements and community benefits agreements, among other additions. Status: In the Assembly Committee on Natural Resources after passage in this committee on April 2, 2025, on a 17-0-1 vote.
SB 787 (McNerney, 2025) would establish the Task Force on Industrial Policy and Clean Energy Development to identify policies and make recommendations on industrial policies that accelerate decarbonization. Status: Set for hearing on April 21, 2025 in Senate Committee on Energy, Utilities & Communications.
- Prior Legislation.
AB 2109 (Carrillo) exempts large industrial customers from paying certain surcharges on their reductions in electricity if that reduction is achieved through an industrial process heat recovery technology with specified requirements. Status: Chapter 700, Statutes of 2024.
AB 2083 (Berman, 2024) requires the CEC to assess the potential for achieving an 85 percent reduction below 1990 levels in emissions from industrial heat application processes by January 1, 2045. Status: Held under submission in the Senate Appropriations Committee.
AB 841 (Berman, 2023) would have required CEC to create a roadmap for electrifying industrial processes, including processes requiring heat, as specified. Status: Held under submission in the Senate Appropriations Committee.
AB 78 (Budget), among its multiple provisions, established the Climate Catalyst Revolving Loan Fund at the IBank. This allowed the state to receive funds from non-state governmental entities and private sources to make loans for projects that further the state’s climate goals. Status: Chapter 10, Statutes 2020.
- Double Referral. This bill is double referred. Upon passage in this committee, it will be referred to the Assembly Committee on Natural Resources for its review.
REGISTERED SUPPORT / OPPOSITION:
Support
None on file.
Opposition
The Utility Reform Network (TURN) – submitted for a prior version of the measure
Analysis Prepared by: Laura Shybut / U. & E. / (916) 319-2083
United States Department of Energy. (2008). Waste Heat Recovery: Technology and Opportunities in U.S. Industry. and Saidur, R., Rezaei, M., Muzammil, W. K., Hassan, M. H., Paria, S., & Hasanuzzaman, M. (2010). Technologies to recover exhaust heat from internal combustion engines. Renewable and Sustainable Energy Reviews, 16(8), 5649–5659. ↑
Zhang, H., Zhang, D., Cai, W., & Liu, M. (2017). Waste heat recovery research – A review of recent developments and future prospects. Energy Procedia, 105, 1987–1992. ↑
Wu, Jiahong, Yuan Jin, and Jianguo Yao. "EC 3: Cutting cooling energy consumption through weather-aware geo-scheduling across multiple datacenters." IEEE Access 6 (2017): 2028-2038. ↑
Masanet, Eric, et al. "Recalibrating global data center energy-use estimates." Science 367.6481 (2020): 984-986. ↑
Shayle Kann, “A skeptic’s take on AI electricity load growth”, Latitude Media. March 6, 2025. ↑
Google, “Announcing Trillium, the sixth generation of Google Cloud TPU,” May 14, 2024 ↑
Shayle Kann, “Can chip efficiency slow AI’s energy demand?” Catalyst, July 18, 2024 ↑
Kylie Foy, “New tools are available to help reduce the energy that AI models devour” MIT News, October 5, 2023. ↑
Aljbour, Jordan, Tom Wilson, and P. Patel. "Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption." EPRI White Paper no. 3002028905 (2024). ↑
Guo, Daya, et al. "Deepseek-r1: Incentivizing reasoning capability in llms via reinforcement learning." arXiv preprint arXiv:2501.12948 (2025). ↑
Norris, Tyler, et al. "Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems." (2025). ↑
Van Heddeghem, W., Lambert, S., Lannoo, B., Colle, D., Pickavet, M., & Demeester, P. (2014). Trends in worldwide ICT electricity consumption from 2007 to 2012. Computer Communications, 50, 64–76. ↑
Masanet, E., Shehabi, A., Lei, N., Smith, S., & Koomey, J. (2020). Recalibrating global data center energy-use estimates. Science, 367(6481), 984–986. ↑
Government Code § 63048.9-63048.100 ↑
Government Code § 63048.92(b) ↑
Government Code § 63048.93 (f)(1) ↑
Government Code § 63048.93 (f)(2) ↑
Government Code § 63048.93 (f)(3) ↑
Government Code § 63048.93 (f)(4-5) ↑
CEC, Demonstration of Low-Cost Data Center Liquid Cooling; June 2024; CEC-500-2024-061; https://www.energy.ca.gov/sites/default/files/2024-06/CEC-500-2024-061.pdf ↑
Ibid, in reference to a Digital Power Group report ↑
Khari Johnson, “Crackdown on power-guzzling data centers may soon come online in California;” CalMatters; February 18, 2025; https://calmatters.org/economy/technology/2025/02/data-center-crackdown-to-protect-california-electricity-rates/?utm_source=chatgpt.com ↑
Radmehr, A., Lou, Y., GhaffarianHoseini, A., & GhaffarianHoseini, A. (2022). Waste heat recovery from data centers: Potential, challenges, and future outlook. Renewable and Sustainable Energy Reviews, 158, 112088 ↑
Shehabi, A., Smith, S., Sartor, D., Brown, R., Herrlin, M., Koomey, J. G., et al. (2016). United States Data Center Energy Usage Report. Lawrence Berkeley National Laboratory. ↑
CEC, Enabling Energy Efficient Data Center in Smart Power Distribution Systems; May 2024; CEC-500-2024-035; https://www.energy.ca.gov/sites/default/files/2024-05/CEC-500-2024-035.pdf?ref=implicator.ai ↑
Bill Author
Bill Co-Author(s):