AB 1532: Public Utilities Commission.
- Session Year: 2025-2026
- House: Assembly
- Latest Version Date: 2025-10-01
Current Status:
Passed
(2025-10-01: Chaptered by Secretary of State - Chapter 205, Statutes of 2025.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
(1)Existing law establishes the membership of the Public Utilities Commission, and the qualifications and tenure of the members of the commission. Existing law requires the commission to report annually to the Legislature on the timeliness in resolving cases, including the days that commissioners presided in hearings.
This bill would additionally require the commission to report on the days that commissioners attended hearings. The bill would require, in reporting on commissioner attendance at hearings, that the report include attendance at all types of hearings, including by hearing type, proceeding type, and industry type, as provided.
(2)The Passenger Charter-party Carriers Act provides for the regulation of charter-party carriers of passengers by the commission and includes specific requirements for liability insurance coverage, background checks, and other regulatory matters applicable to transportation network companies (TNCs), which are certain organizations that, using an online-enabled application or platform, connect passengers with drivers using a personal vehicle. The act requires, until January 1, 2026, the commission, as part of its regulation of TNCs, to establish, in a new or existing proceeding, a program relating to accessibility for persons with disabilities. Among other program requirements, the act requires each TNC, by July 1, 2019, to pay on a quarterly basis to the commission an amount equivalent to, at a minimum, $0.05 for each TNC trip completed using the TNCs online-enabled application or platform that originates in certain geographic areas except if a TNC satisfies certain requirements for a partial or complete exemption from those charges, as specified. The act requires those charges collected by the commission to be deposited into the TNC Access for All Fund, and continuously appropriates moneys in the fund to the commission for purposes of the program, including for distribution on a competitive basis to access providers that establish on-demand transportation programs or partnerships to meet the needs of persons with disabilities in the geographic areas included in the program.
This bill would extend the requirement for the commission to establish that program until January 1, 2032, including extending the $0.05 charge for each completed TNC trip. By extending the operation of the TNC Access for All Fund, which is a continuously appropriated fund, the bill would make an appropriation.
(3)Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(4)This bill would declare that it is to take effect immediately as an urgency statute.
(1)Existing law establishes the membership of the Public Utilities Commission, and the qualifications and tenure of the members of the commission. Existing law requires the commission to report annually to the Legislature on the timeliness in resolving cases, including the days that commissioners presided in hearings.
This bill would additionally require the commission to report on the days that commissioners attended hearings. The bill would require, in reporting on commissioner attendance at hearings, that the report include attendance at all types of hearings, including by hearing type, proceeding type, and industry type, as provided.
(2)The Passenger Charter-party Carriers Act provides for the regulation of charter-party carriers of passengers by the commission and includes specific requirements for liability insurance coverage, background checks, and other regulatory matters applicable to transportation network companies (TNCs), which are certain organizations that, using an online-enabled application or platform, connect passengers with drivers using a personal vehicle. The act requires, until January 1, 2026, the commission, as part of its regulation of TNCs, to establish, in a new or existing proceeding, a program relating to accessibility for persons with disabilities. Among other program requirements, the act requires each TNC, by July 1, 2019, to pay on a quarterly basis to the commission an amount equivalent to, at a minimum, $0.05 for each TNC trip completed using the TNCs online-enabled application or platform that originates in certain geographic areas except if a TNC satisfies certain requirements for a partial or complete exemption from those charges, as specified. The act requires those charges collected by the commission to be deposited into the TNC Access for All Fund, and continuously appropriates moneys in the fund to the commission for purposes of the program, including for distribution on a competitive basis to access providers that establish on-demand transportation programs or partnerships to meet the needs of persons with disabilities in the geographic areas included in the program.
This bill would extend the requirement for the commission to establish that program until January 1, 2032, including extending the $0.05 charge for each completed TNC trip. By extending the operation of the TNC Access for All Fund, which is a continuously appropriated fund, the bill would make an appropriation.
(3)Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(4)This bill would declare that it is to take effect immediately as an urgency statute.
(1)Existing law establishes the membership of the Public Utilities Commission, and the qualifications and tenure of the members of the commission. Existing law requires the commission to report annually to the Legislature on the timeliness in resolving cases, including the days that commissioners presided in hearings.
This bill would additionally require the commission to report on the days that commissioners attended hearings. The bill would require, in reporting on commissioner attendance at hearings, that the report include attendance at all types of hearings, including by hearing type, proceeding type, and industry type, as provided. The bill would require a commissioner to appear at a legislative hearing at the request of the chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the commission.
(2)The Passenger Charter-party Carriers Act provides for the regulation of charter-party carriers of passengers by the commission and includes specific requirements for liability insurance coverage, background checks, and other regulatory matters applicable to transportation network companies (TNCs), which are certain organizations that, using an online-enabled application or platform, connect passengers with drivers using a personal vehicle. The act requires, until January 1, 2026, the commission, as part of its regulation of TNCs, to establish, in a new or existing proceeding, a program relating to accessibility for persons with disabilities. Among other program requirements, the act requires each TNC, by July 1, 2019, to pay on a quarterly basis to the commission an amount equivalent to, at a minimum, $0.05 for each TNC trip completed using the TNCs online-enabled application or platform that originates in certain geographic areas except if a TNC satisfies certain requirements for a partial or complete exemption from those charges, as specified. The act requires those charges collected by the commission to be deposited into the TNC Access for All Fund, and continuously appropriates moneys in the fund to the commission for purposes of the program, including for distribution on a competitive basis to access providers that establish on-demand transportation programs or partnerships to meet the needs of persons with disabilities in the geographic areas included in the program.
This bill would extend the requirement for the commission to establish that program until January 1, 2032, including extending the $0.05 charge for each completed TNC trip. By extending the operation of the TNC Access for All Fund, which is a continuously appropriated fund, the bill would make an appropriation.
(3)Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(4)This bill would declare that it is to take effect immediately as an urgency statute.
(1)Existing law establishes the membership of the Public Utilities Commission, and the qualifications and tenure of the members of the commission. Existing law requires the commission to report annually to the Legislature on the timeliness in resolving cases, including the days that commissioners presided in hearings.
This bill would require the commission to adopt rules governing commissioner attendance at hearings.This bill would additionally require the commission to report on the days that commissioners attended hearings. The bill would require, in reporting on commissioner attendance at hearings, that the report include attendance at all types of hearings, including by hearing type, proceeding type, and industry type, as provided. The bill would require a commissioner to appear at a legislative hearing at the request of the chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the commission.
(2)Existing law establishes the Deaf and Disabled Telecommunications Program and requires the commission to administer a surcharge to collect revenues of up to $100,000,000 per year until January 1, 2025, subject to an annual appropriation of moneys by the Legislature, to allow providers of equipment and service pursuant to the Deaf and Disabled Telecommunications Program to recover their costs as they are incurred. Existing law establishes the Deaf and Disabled Telecommunications Program Administrative Committee Fund for the program described above.This bill would extend the requirement on the commission to collect the surcharge described above until January 1, 2031.(3)(2)The Passenger Charter-party Carriers Act provides for the regulation of charter-party carriers of passengers by the commission and includes specific requirements for liability insurance coverage, background checks, and other regulatory matters applicable to transportation network companies (TNCs), which are certain organizations that, using an online-enabled application or platform, connect passengers with drivers using a personal vehicle. The act requires, until January 1, 2026, the commission, as part of its regulation of TNCs, to establish, in a new or existing proceeding, a program relating to accessibility for persons with disabilities. Among other program requirements, the act requires each TNC, by July 1, 2019, to pay on a quarterly basis to the commission an amount equivalent to, at a minimum, $0.05 for each TNC trip completed using the TNCs online-enabled application or platform that originates in certain geographic areas except if a TNC satisfies certain requirements for a partial or complete exemption from those charges, as specified. The act requires those charges collected by the commission to be deposited into the TNC Access for All Fund, and continuously appropriates moneys in the fund to the commission for purposes of the program, including for distribution on a competitive basis to access providers that establish on-demand transportation programs or partnerships to meet the needs of persons with disabilities in the geographic areas included in the program.
This bill would extend the requirement for the commission to establish that program until January 1, 2032, including extending the $0.05 charge for each completed TNC trip. By extending the operation of the TNC Access for All Fund, which is a continuously appropriated fund, the bill would make an appropriation.
(4)(3)Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(5)(4)This bill would declare that it is to take effect immediately as an urgency statute.
(1)Existing law establishes the membership of the Public Utilities Commission, and the qualifications and tenure of the members of the commission.
This bill would require the commission to adopt rules governing commissioner attendance at hearings.
This bill would require a commissioner to appear at a legislative hearing at the request of the chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the commission.
(2)Existing law establishes the Deaf and Disabled Telecommunications Program and requires the commission to administer a surcharge to collect revenues of up to $100,000,000 per year until January 1, 2025, subject to an annual appropriation of moneys by the Legislature, to allow providers of equipment and service pursuant to the Deaf and Disabled Telecommunications Program to recover their costs as they are incurred. Existing law establishes the Deaf and Disabled Telecommunications Program Administrative Committee Fund for the program described above.
This bill would extend the requirement on the commission to collect the surcharge described above until January 1, 2031.
(3)The Passenger Charter-party Carriers Act provides for the regulation of charter-party carriers of passengers by the commission and includes specific requirements for liability insurance coverage, background checks, and other regulatory matters applicable to transportation network companies (TNCs), which are certain organizations that, using an online-enabled application or platform, connect passengers with drivers using a personal vehicle. The act requires, until January 1, 2026, the commission, as part of its regulation of TNCs, to establish, in a new or existing proceeding, a program relating to accessibility for persons with disabilities. Among other program requirements, the act requires each TNC, by July 1, 2019, to pay on a quarterly basis to the commission an amount equivalent to, at a minimum, $0.05 for each TNC trip completed using the TNCs online-enabled application or platform that originates in certain geographic areas except if a TNC satisfies certain requirements for a partial or complete exemption from those charges, as specified. The act requires those charges collected by the commission to be deposited into the TNC Access for All Fund, and continuously appropriates moneys in the fund to the commission for purposes of the program, including for distribution on a competitive basis to access providers that establish on-demand transportation programs or partnerships to meet the needs of persons with disabilities in the geographic areas included in the program.
This bill would extend the requirement for the commission to establish that program until January 1, 2032, including extending the $0.05 charge for each completed TNC trip. By extending the operation of the TNC Access for All Fund, which is a continuously appropriated fund, the bill would make an appropriation.
(4)Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(5)This bill would include a change in state statute that would result in a taxpayer paying a higher tax within the meaning of Section 3 of Article XIIIA of the California Constitution, and thus would require for passage the approval of 2/3 of the membership of each house of the Legislature.(5)This bill would declare that it is to take effect immediately as an urgency statute.
(1)Existing law establishes the membership of the Public Utilities Commission, and the qualifications and tenure of the members of the commission. Existing law requires commissioners to be civil executive officers and requires their salaries to be fixed by law and paid in the same manner as the salaries of other state officers.
This bill would require commissioners to attend no less than 25% of the hearings that are part of a ratesetting proceeding in order to receive their salaries, as specified. The bill would require the commission to adopt rules governing commissioner attendance at hearings and would require the Milton Marks Little Hoover Commission on California State Government Organization and Economy, on or before January 1, 2027, to publish a report with recommendations to the Legislature and the Governor for increasing commissioner attendance at commission hearings and improving commission timelines in resolving proceedings. The bill would require the report to evaluate whether a reorganization of the commissions work and jurisdiction not related to electrical or gas corporations would result in ratepayer cost savings, savings to the General Fund, increased commissioner attendance at hearings, or more timely disposition of proceedings. hearings.
This bill would require a commissioner to appear at a legislative hearing at the request of the chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the commission.
(2)Existing law establishes the Deaf and Disabled Telecommunications Program and requires the commission to administer a surcharge to collect revenues of up to $100,000,000 per year until January 1, 2025, subject to an annual appropriation of moneys by the Legislature, to allow providers of equipment and service pursuant to the Deaf and Disabled Telecommunications Program to recover their costs as they are incurred. Existing law establishes the Deaf and Disabled Telecommunications Program Administrative Committee Fund for the program described above.
This bill would extend the requirement on the commission to collect the surcharge described above until January 1, 2031.
(3)The Passenger Charter-party Carriers Act provides for the regulation of charter-party carriers of passengers by the commission and includes specific requirements for liability insurance coverage, background checks, and other regulatory matters applicable to transportation network companies (TNCs), which are certain organizations that, using an online-enabled application or platform, connect passengers with drivers using a personal vehicle. The act requires, until January 1, 2026, the commission, as part of its regulation of TNCs, to establish, in a new or existing proceeding, a program relating to accessibility for persons with disabilities. Among other program requirements, the act requires each TNC, by July 1, 2019, to pay on a quarterly basis to the commission an amount equivalent to, at a minimum, $0.05 for each TNC trip completed using the TNCs online-enabled application or platform that originates in certain geographic areas except if a TNC satisfies certain requirements for a partial or complete exemption from those charges, as specified. The act requires those charges collected by the commission to be deposited into the TNC Access for All Fund, and continuously appropriates moneys in the fund to the commission for purposes of the program, including for distribution on a competitive basis to access providers that establish on-demand transportation programs or partnerships to meet the needs of persons with disabilities in the geographic areas included in the program.
This bill would extend the requirement for the commission to establish that program until January 1, 2032, including extending the $0.05 charge for each completed TNC trip. By extending the operation of the TNC Access for All Fund, which is a continuously appropriated fund, the bill would make an appropriation.
(4)Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(5)This bill would include a change in state statute that would result in a taxpayer paying a higher tax within the meaning of Section 3 of Article XIIIA of the California Constitution, and thus would require for passage the approval of 2/3 of the membership of each house of the Legislature.
(1)Existing law establishes the membership of the Public Utilities Commission, and the qualifications and tenure of the members of the commission. Existing law requires commissioners to be civil executive officers and requires their salaries to be fixed by law and paid in the same manner as the salaries of other state officers.
This bill would require commissioners to attend no less than 25% of the hearings that are part of a ratesetting proceeding in order to receive their salaries, as specified. The bill would require the commission to adopt rules governing commissioner attendance at hearings and would require the Milton Marks Little Hoover Commission on California State Government Organization and Economy, on or before January 1, 2027, to publish a report with recommendations to the Legislature and the Governor for increasing commissioner attendance at commission hearings and improving commission timelines in resolving proceedings. The bill would require the report to evaluate whether a reorganization of the commissions work and jurisdiction not related to electrical or gas corporations would result in ratepayer cost savings, savings to the General Fund, increased commissioner attendance at hearings, or more timely disposition of proceedings.
This bill would require a commissioner to appear at a legislative hearing at the request of the chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the commission.
(2)Existing law establishes the Deaf and Disabled Telecommunications Program and requires the commission to administer a surcharge to collect revenues of up to $100,000,000 per year until January 1, 2025, subject to an annual appropriation of moneys by the Legislature, to allow providers of equipment and service pursuant to the Deaf and Disabled Telecommunications Program to recover their costs as they are incurred. Existing law establishes the Deaf and Disabled Telecommunications Program Administrative Committee Fund for the program described above.
This bill would extend the requirement on the commission to collect the surcharge described above until January 1, 2031.
(3)The Passenger Charter-party Carriers Act provides for the regulation of charter-party carriers of passengers by the commission and includes specific requirements for liability insurance coverage, background checks, and other regulatory matters applicable to transportation network companies (TNCs), which are certain organizations that, using an online-enabled application or platform, connect passengers with drivers using a personal vehicle. The act requires, until January 1, 2026, the commission, as part of its regulation of TNCs, to establish, in a new or existing proceeding, a program relating to accessibility for persons with disabilities. Among other program requirements, the act requires each TNC, by July 1, 2019, to pay on a quarterly basis to the commission an amount equivalent to, at a minimum, $0.05 for each TNC trip completed using the TNCs online-enabled application or platform that originates in certain geographic areas except if a TNC satisfies certain requirements for a partial or complete exemption from those charges, as specified. The act requires those charges collected by the commission to be deposited into the TNC Access for All Fund, and continuously appropriates moneys in the fund to the commission for purposes of the program, including for distribution on a competitive basis to access providers that establish on-demand transportation programs or partnerships to meet the needs of persons with disabilities in the geographic areas included in the program.
This bill would extend the requirement for the commission to establish that program until January 1, 2032, including extending the $0.05 charge for each completed TNC trip. By extending the operation of the TNC Access for All Fund, which is a continuously appropriated fund, the bill would make an appropriation.
(4)Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(5)This bill would include a change in state statute that would result in a taxpayer paying a higher tax within the meaning of Section 3 of Article XIIIA of the California Constitution, and thus would require for passage the approval of 2/3 of the membership of each house of the Legislature.
(a)The commission shall annually submit a report to the Legislature on the commissions timeliness in resolving cases, information on the disposition of applications for rehearings, and the days that commissioners presided in and attended hearings. The report shall include the number of scoping memos issued in each proceeding and the number of orders issued extending the statutory deadlines pursuant to subdivision (e) of Section 1701.2, for all adjudication cases, and pursuant to subdivision (a) of Section 1701.5, for all ratesetting or quasi-legislative cases.
(b)For reporting on commissioner attendance at hearings, the report shall include reporting based on attendance at all types of hearings, including by all of the following:
(1)Hearing type, including, but not limited to, prehearing conferences, evidentiary hearings, public participation hearings, and workshops.
(2)Proceeding type, including quasi-legislative, an adjudication, a rate-setting, or a catastrophic wildfire proceeding.
(3)Industry type, including electric, gas, water, telecommunications, or transportation.
SEC. 2.Section 5440.5 of the Public Utilities Code is amended to read:5440.5.(a)As part of the regulation of transportation network companies (TNCs) referenced in subdivision (a) of Section 5440, the commission shall do all of the following:
(1)In a new or existing proceeding, establish a program relating to accessibility for persons with disabilities, including wheelchair users who need a wheelchair-accessible vehicle (WAV). This program shall include, but is not limited to, all of the following:
(A)By January 1, 2019, the commission shall begin conducting workshops with stakeholders, including California cities and counties, disability rights organizations, persons with disabilities, transportation and transit agencies, social service transportation providers, paratransit coordinating councils, and transportation network companies, in order to determine community WAV demand and WAV supply and to develop and provide recommendations regarding the establishment of geographic areas, criteria for Access Fund expenditures, and educational outreach objectives for programs for on-demand services and partnerships consistent with the requirements of this section. The workshops may also examine topics including, but not limited to, vehicle specifications, subsidies for wheelchair pickups, maintenance and fuel costs, designated pickup locations for drivers in locations where door-to-door service is not feasible, standards for trip requests, response times, and rider initiated cancellation, limiting of stranded users, integration of service into city and county transportation plans, or any necessary training or additional incentives for WAV drivers that results in a measurable impact on service availability, efficiency, and efficacy. The commission shall conduct a minimum of five workshops throughout the state.
(B)(i)The commission shall require each TNC, by July 1, 2019, to pay on a quarterly basis to the commission an amount equivalent to, at minimum, five cents ($0.05) for each TNC trip completed using the transportation network companys online-enabled application or platform that originates in one of the geographic areas selected pursuant to subparagraph (D), except if the TNC meets the requirements of an exemption established by the commission pursuant to subparagraph (G). The commission may adjust the fee in each geographic area selected pursuant to subparagraph (D) to different levels based on the cost of providing adequate WAV service within the geographic area.
(ii)Each TNC shall charge its customers on each TNC trip completed the full amount of the per-trip fee established pursuant to this subparagraph, and remit the total amount of those fees charged to the commission each quarter. The commission shall authorize a TNC to offset against the amounts due pursuant to this subparagraph for a particular quarter the amounts spent by the TNC during that quarter to improve WAV service on its online-enabled application or platform for each geographic area and thereby reduce the amount required to be remitted to the commission. In order to offset amounts due pursuant to this subparagraph in a geographic area, the commission shall require a TNC, at a minimum, to demonstrate, in the geographic area, the presence and availability of drivers with WAVs on its online-enabled application or platform, improved level of service, including reasonable response times, due to those investments for WAV service compared to the previous quarter, efforts undertaken to publicize and promote available WAV services to disability communities, and a full accounting of funds expended.
(C)The commission shall create the TNC Access for All Fund (Access Fund) and deposit moneys collected pursuant to subparagraph (B) in the Access Fund. The commission shall distribute funds in the Access Fund on a competitive basis to access providers that establish on-demand transportation programs or partnerships to meet the needs of persons with disabilities, including wheelchair users who need a WAV, in the geographic areas selected pursuant to subparagraph (D).
(D)The commission shall select geographic areas, which shall be based on the demand for WAVs within the area and selected according to outcomes of workshops in subparagraph (A), for inclusion in the on-demand transportation programs or partnerships funded pursuant to subparagraph (C). The commission shall allocate moneys in the Access Fund for use in each geographic area in a manner that is proportional to the percent of the Access Fund fees originating in that geographic area.
(E)The commission shall request access providers to submit applications to receive funds pursuant to subparagraph (C) by April 1, 2020. The commission may accept applications for new on-demand transportation programs or partnerships any time after April 1, 2020. From the applications that are submitted, the commission shall select by July 1, 2020, on-demand transportation programs or partnerships to receive funding based on criteria adopted by the commission in consultation with stakeholders described in subparagraph (A). As part of the criteria, the commission shall require an access provider to demonstrate in its application, at a minimum, how the program or partnership improves response times for WAV service compared to the previous year, the presence and availability of WAVs within the geographic area, and efforts undertaken to publicize and promote available WAV services to disability communities.
(F)The commission shall distribute funds pursuant to subparagraph (E) in the Access Fund within 90 days following the end of each year. If no access provider meets the requirements, funds shall remain in the Access Fund and be distributed the next year.
(G)The commission shall require each transportation network company to be accessible to persons with disabilities in order to be exempt from paying the charge required pursuant to subparagraph (B). The commission shall adopt a designated level of WAV service that is required to be met in each geographic area via a TNCs online-enabled application or platform in order for the TNC to be exempt from paying the fee required pursuant to subparagraph (B) for the next year in that geographic area. As part of the designated level of WAV service for each geographic area, the commission shall require a TNC, at a minimum, to have response times for 80 percent of WAV trips requested via the TNCs online-enabled application or platform within a time established by the commission for that geographic area. If a TNC meets the WAV service level requirement established pursuant to this subparagraph in a geographic area selected pursuant to subparagraph (D) for a particular year, the TNC shall be exempt from paying the fee imposed pursuant to subparagraph (B) for the next year for that geographic area only. A TNC may provide a higher level of service than the minimum service level requirement designated by the commission.
(H)A TNC may meet the requirements of clause (ii) of subparagraph (B) and subparagraph (G) by facilitating WAV service through its online-enabled application or platform, by directly providing WAV service with vehicles that it owns, or by a contract to provide WAV service with a transportation provider, or by any combination of these methods.
(I)Within 30 days after the end of each quarter, a transportation network company that receives an offset pursuant to clause (ii) of subparagraph (B) or an access provider that receives funding pursuant to subparagraph (C) shall submit a report to the commission. The report shall include, but shall not be limited to, all of the following:
(i)The number of WAV rides requested.
(ii)The number of WAV rides fulfilled.
(iii)Data detailing the response time between when a WAV ride was requested and when the vehicle arrived.
(iv)Information regarding educational outreach to disability communities, including, but not limited to, information and promotion of availability of WAVs for wheelchair users.
(v)A detailed description of expenditures or investments, as applicable.
(J)The commission shall establish yearly benchmarks for TNCs and access providers to meet to ensure WAV users receive continuously improved, reliable, and available service. These benchmarks shall include, but are not limited to, response times, percentage of trips fulfilled versus trips requested, and number of users requesting rides versus community WAV demand for each geographic area.
(K)The commission shall authorize no more than 2 percent of existing funds collected from TNCs pursuant to Section 421 and deposited into the Public Utilities Commission Transportation Reimbursement Account to be distributed to accessibility advocates who provide a substantial contribution to the proceeding initiated pursuant to this section, and only for the duration of the commission proceeding initiated pursuant to this section. These funds shall only be distributed to advocates for accessible transportation or representatives of a group whose membership uses accessible transportation. The commission shall distribute funds pursuant to this subparagraph in a manner consistent with the requirements of Sections 1803 to 1808, inclusive. The commission shall not increase the fees authorized pursuant to Section 421 in order to fulfill the requirements of this subparagraph. Nothing in this subparagraph is intended to allow parties to obtain intervenor compensation for other transportation proceedings at the commission.
(2)(A)Report to the Legislature by January 1, 2024, on compliance with this section and on the effectiveness of the on-demand transportation programs or partnerships funded pursuant to this section. The report shall include, but not be limited to, all of the following:
(i)A study on the demand for WAVs, including demand according to time of day and geographic area.
(ii)An analysis of the reports required to be submitted by access providers receiving funding pursuant to paragraph (1).
(iii)The availability of unallocated funds in the Access Fund, including the need to reassess Access Fund allocations.
(iv)An analysis of current program capabilities and deficiencies, and recommendations to overcome any identified deficiencies.
(B)The report required by this paragraph shall be submitted to the Legislature in compliance with Section 9795 of the Government Code.
(3)Create a working group with stakeholders described in subparagraph (A) of paragraph (1) to examine the variety of agencies, localities, and programs that provide transportation services for persons with disabilities, including passenger stage carriers and charter-party carriers within the commissions jurisdiction, in order to evaluate ways to partner with those agencies to provide services to disabled persons in a nonduplicative, nondiscriminatory, and more efficient manner.
(b)Notwithstanding Section 13340 of the Government Code, moneys deposited in the TNC Access for All Fund created pursuant to subparagraph (C) of paragraph (1) of subdivision (a) are continuously appropriated to the commission without regard to fiscal years for purposes of the program established pursuant to this section.
(c)The commission may hire an independent entity to administer the program established pursuant to subdivision (a) and to complete the report required pursuant to paragraph (2) of subdivision (a).
(d)This section does not limit the rights of any person to pursue any remedies or causes of action that they may have under any state or federal law to enforce compliance with those laws or the obligations stated in this section. This section does not expand or limit any obligations, if any, of a transportation network company under existing state or federal disability access laws.
(e)This section shall remain in effect only until January 1, 2032, and as of that date is repealed.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SEC. 4.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to ensure accountability of the Commissioners of the Public Utilities Commission and protect the fiscal stability of a transportation program for persons with disabilities, it is necessary that this act take effect immediately.
(a)The commission shall annually submit a report to the Legislature on the commissions timeliness in resolving cases, information on the disposition of applications for rehearings, and the days that commissioners presided in and attended hearings. The report shall include the number of scoping memos issued in each proceeding and the number of orders issued extending the statutory deadlines pursuant to subdivision (e) of Section 1701.2, for all adjudication cases, and pursuant to subdivision (a) of Section 1701.5, for all ratesetting or quasi-legislative cases.
(b)For reporting on commissioner attendance at hearings, the report shall include reporting based on attendance at all types of hearings, including by all of the following:
(1)Hearing type, including, but not limited to, prehearing conferences, evidentiary hearings, public participation hearings, and workshops.
(2)Proceeding type, including quasi-legislative, an adjudication, a rate-setting, or a catastrophic wildfire proceeding.
(3)Industry type, including electric, gas, water, telecommunications, or transportation.
SEC. 2.Section 5440.5 of the Public Utilities Code is amended to read:5440.5.(a)As part of the regulation of transportation network companies (TNCs) referenced in subdivision (a) of Section 5440, the commission shall do all of the following:
(1)In a new or existing proceeding, establish a program relating to accessibility for persons with disabilities, including wheelchair users who need a wheelchair-accessible vehicle (WAV). This program shall include, but is not limited to, all of the following:
(A)By January 1, 2019, the commission shall begin conducting workshops with stakeholders, including California cities and counties, disability rights organizations, persons with disabilities, transportation and transit agencies, social service transportation providers, paratransit coordinating councils, and transportation network companies, in order to determine community WAV demand and WAV supply and to develop and provide recommendations regarding the establishment of geographic areas, criteria for Access Fund expenditures, and educational outreach objectives for programs for on-demand services and partnerships consistent with the requirements of this section. The workshops may also examine topics including, but not limited to, vehicle specifications, subsidies for wheelchair pickups, maintenance and fuel costs, designated pickup locations for drivers in locations where door-to-door service is not feasible, standards for trip requests, response times, and rider initiated cancellation, limiting of stranded users, integration of service into city and county transportation plans, or any necessary training or additional incentives for WAV drivers that results in a measurable impact on service availability, efficiency, and efficacy. The commission shall conduct a minimum of five workshops throughout the state.
(B)(i)The commission shall require each TNC, by July 1, 2019, to pay on a quarterly basis to the commission an amount equivalent to, at minimum, five cents ($0.05) for each TNC trip completed using the transportation network companys online-enabled application or platform that originates in one of the geographic areas selected pursuant to subparagraph (D), except if the TNC meets the requirements of an exemption established by the commission pursuant to subparagraph (G). The commission may adjust the fee in each geographic area selected pursuant to subparagraph (D) to different levels based on the cost of providing adequate WAV service within the geographic area.
(ii)Each TNC shall charge its customers on each TNC trip completed the full amount of the per-trip fee established pursuant to this subparagraph, and remit the total amount of those fees charged to the commission each quarter. The commission shall authorize a TNC to offset against the amounts due pursuant to this subparagraph for a particular quarter the amounts spent by the TNC during that quarter to improve WAV service on its online-enabled application or platform for each geographic area and thereby reduce the amount required to be remitted to the commission. In order to offset amounts due pursuant to this subparagraph in a geographic area, the commission shall require a TNC, at a minimum, to demonstrate, in the geographic area, the presence and availability of drivers with WAVs on its online-enabled application or platform, improved level of service, including reasonable response times, due to those investments for WAV service compared to the previous quarter, efforts undertaken to publicize and promote available WAV services to disability communities, and a full accounting of funds expended.
(C)The commission shall create the TNC Access for All Fund (Access Fund) and deposit moneys collected pursuant to subparagraph (B) in the Access Fund. The commission shall distribute funds in the Access Fund on a competitive basis to access providers that establish on-demand transportation programs or partnerships to meet the needs of persons with disabilities, including wheelchair users who need a WAV, in the geographic areas selected pursuant to subparagraph (D).
(D)The commission shall select geographic areas, which shall be based on the demand for WAVs within the area and selected according to outcomes of workshops in subparagraph (A), for inclusion in the on-demand transportation programs or partnerships funded pursuant to subparagraph (C). The commission shall allocate moneys in the Access Fund for use in each geographic area in a manner that is proportional to the percent of the Access Fund fees originating in that geographic area.
(E)The commission shall request access providers to submit applications to receive funds pursuant to subparagraph (C) by April 1, 2020. The commission may accept applications for new on-demand transportation programs or partnerships any time after April 1, 2020. From the applications that are submitted, the commission shall select by July 1, 2020, on-demand transportation programs or partnerships to receive funding based on criteria adopted by the commission in consultation with stakeholders described in subparagraph (A). As part of the criteria, the commission shall require an access provider to demonstrate in its application, at a minimum, how the program or partnership improves response times for WAV service compared to the previous year, the presence and availability of WAVs within the geographic area, and efforts undertaken to publicize and promote available WAV services to disability communities.
(F)The commission shall distribute funds pursuant to subparagraph (E) in the Access Fund within 90 days following the end of each year. If no access provider meets the requirements, funds shall remain in the Access Fund and be distributed the next year.
(G)The commission shall require each transportation network company to be accessible to persons with disabilities in order to be exempt from paying the charge required pursuant to subparagraph (B). The commission shall adopt a designated level of WAV service that is required to be met in each geographic area via a TNCs online-enabled application or platform in order for the TNC to be exempt from paying the fee required pursuant to subparagraph (B) for the next year in that geographic area. As part of the designated level of WAV service for each geographic area, the commission shall require a TNC, at a minimum, to have response times for 80 percent of WAV trips requested via the TNCs online-enabled application or platform within a time established by the commission for that geographic area. If a TNC meets the WAV service level requirement established pursuant to this subparagraph in a geographic area selected pursuant to subparagraph (D) for a particular year, the TNC shall be exempt from paying the fee imposed pursuant to subparagraph (B) for the next year for that geographic area only. A TNC may provide a higher level of service than the minimum service level requirement designated by the commission.
(H)A TNC may meet the requirements of clause (ii) of subparagraph (B) and subparagraph (G) by facilitating WAV service through its online-enabled application or platform, by directly providing WAV service with vehicles that it owns, or by a contract to provide WAV service with a transportation provider, or by any combination of these methods.
(I)Within 30 days after the end of each quarter, a transportation network company that receives an offset pursuant to clause (ii) of subparagraph (B) or an access provider that receives funding pursuant to subparagraph (C) shall submit a report to the commission. The report shall include, but shall not be limited to, all of the following:
(i)The number of WAV rides requested.
(ii)The number of WAV rides fulfilled.
(iii)Data detailing the response time between when a WAV ride was requested and when the vehicle arrived.
(iv)Information regarding educational outreach to disability communities, including, but not limited to, information and promotion of availability of WAVs for wheelchair users.
(v)A detailed description of expenditures or investments, as applicable.
(J)The commission shall establish yearly benchmarks for TNCs and access providers to meet to ensure WAV users receive continuously improved, reliable, and available service. These benchmarks shall include, but are not limited to, response times, percentage of trips fulfilled versus trips requested, and number of users requesting rides versus community WAV demand for each geographic area.
(K)The commission shall authorize no more than 2 percent of existing funds collected from TNCs pursuant to Section 421 and deposited into the Public Utilities Commission Transportation Reimbursement Account to be distributed to accessibility advocates who provide a substantial contribution to the proceeding initiated pursuant to this section, and only for the duration of the commission proceeding initiated pursuant to this section. These funds shall only be distributed to advocates for accessible transportation or representatives of a group whose membership uses accessible transportation. The commission shall distribute funds pursuant to this subparagraph in a manner consistent with the requirements of Sections 1803 to 1808, inclusive. The commission shall not increase the fees authorized pursuant to Section 421 in order to fulfill the requirements of this subparagraph. Nothing in this subparagraph is intended to allow parties to obtain intervenor compensation for other transportation proceedings at the commission.
(2)(A)Report to the Legislature by January 1, 2024, on compliance with this section and on the effectiveness of the on-demand transportation programs or partnerships funded pursuant to this section. The report shall include, but not be limited to, all of the following:
(i)A study on the demand for WAVs, including demand according to time of day and geographic area.
(ii)An analysis of the reports required to be submitted by access providers receiving funding pursuant to paragraph (1).
(iii)The availability of unallocated funds in the Access Fund, including the need to reassess Access Fund allocations.
(iv)An analysis of current program capabilities and deficiencies, and recommendations to overcome any identified deficiencies.
(B)The report required by this paragraph shall be submitted to the Legislature in compliance with Section 9795 of the Government Code.
(3)Create a working group with stakeholders described in subparagraph (A) of paragraph (1) to examine the variety of agencies, localities, and programs that provide transportation services for persons with disabilities, including passenger stage carriers and charter-party carriers within the commissions jurisdiction, in order to evaluate ways to partner with those agencies to provide services to disabled persons in a nonduplicative, nondiscriminatory, and more efficient manner.
(b)Notwithstanding Section 13340 of the Government Code, moneys deposited in the TNC Access for All Fund created pursuant to subparagraph (C) of paragraph (1) of subdivision (a) are continuously appropriated to the commission without regard to fiscal years for purposes of the program established pursuant to this section.
(c)The commission may hire an independent entity to administer the program established pursuant to subdivision (a) and to complete the report required pursuant to paragraph (2) of subdivision (a).
(d)This section does not limit the rights of any person to pursue any remedies or causes of action that they may have under any state or federal law to enforce compliance with those laws or the obligations stated in this section. This section does not expand or limit any obligations, if any, of a transportation network company under existing state or federal disability access laws.
(e)This section shall remain in effect only until January 1, 2032, and as of that date is repealed.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SEC. 4.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to ensure accountability of the Commissioners of the Public Utilities Commission and protect the fiscal stability of a transportation program for persons with disabilities, it is necessary that this act take effect immediately.
(a)The commission shall annually submit a report to the Legislature on the commissions timeliness in resolving cases, information on the disposition of applications for rehearings, and the days that commissioners presided in and attended hearings. The report shall include the number of scoping memos issued in each proceeding and the number of orders issued extending the statutory deadlines pursuant to subdivision (e) of Section 1701.2, for all adjudication cases, and pursuant to subdivision (a) of Section 1701.5, for all ratesetting or quasi-legislative cases.
(b)For reporting on commissioner attendance at hearings, the report shall include reporting based on attendance at all types of hearings, including by all of the following:
(1)Hearing type, including, but not limited to, prehearing conferences, evidentiary hearings, public participation hearings, and workshops.
(2)Proceeding type, including quasi-legislative, an adjudication, a rate-setting, or a catastrophic wildfire proceeding.
(3)Industry type, including electric, gas, water, telecommunications, or transportation.
SEC. 3.SEC. 2.Section 5440.5 of the Public Utilities Code is amended to read:5440.5.(a)As part of the regulation of transportation network companies (TNCs) referenced in subdivision (a) of Section 5440, the commission shall do all of the following:
(1)In a new or existing proceeding, establish a program relating to accessibility for persons with disabilities, including wheelchair users who need a wheelchair-accessible vehicle (WAV). This program shall include, but is not limited to, all of the following:
(A)By January 1, 2019, the commission shall begin conducting workshops with stakeholders, including California cities and counties, disability rights organizations, persons with disabilities, transportation and transit agencies, social service transportation providers, paratransit coordinating councils, and transportation network companies, in order to determine community WAV demand and WAV supply and to develop and provide recommendations regarding the establishment of geographic areas, criteria for Access Fund expenditures, and educational outreach objectives for programs for on-demand services and partnerships consistent with the requirements of this section. The workshops may also examine topics including, but not limited to, vehicle specifications, subsidies for wheelchair pickups, maintenance and fuel costs, designated pickup locations for drivers in locations where door-to-door service is not feasible, standards for trip requests, response times, and rider initiated cancellation, limiting of stranded users, integration of service into city and county transportation plans, or any necessary training or additional incentives for WAV drivers that results in a measurable impact on service availability, efficiency, and efficacy. The commission shall conduct a minimum of five workshops throughout the state.
(B)(i)The commission shall require each TNC, by July 1, 2019, to pay on a quarterly basis to the commission an amount equivalent to, at minimum, five cents ($0.05) for each TNC trip completed using the transportation network companys online-enabled application or platform that originates in one of the geographic areas selected pursuant to subparagraph (D), except if the TNC meets the requirements of an exemption established by the commission pursuant to subparagraph (G). The commission may adjust the fee in each geographic area selected pursuant to subparagraph (D) to different levels based on the cost of providing adequate WAV service within the geographic area.
(ii)Each TNC shall charge its customers on each TNC trip completed the full amount of the per-trip fee established pursuant to this subparagraph, and remit the total amount of those fees charged to the commission each quarter. The commission shall authorize a TNC to offset against the amounts due pursuant to this subparagraph for a particular quarter the amounts spent by the TNC during that quarter to improve WAV service on its online-enabled application or platform for each geographic area and thereby reduce the amount required to be remitted to the commission. In order to offset amounts due pursuant to this subparagraph in a geographic area, the commission shall require a TNC, at a minimum, to demonstrate, in the geographic area, the presence and availability of drivers with WAVs on its online-enabled application or platform, improved level of service, including reasonable response times, due to those investments for WAV service compared to the previous quarter, efforts undertaken to publicize and promote available WAV services to disability communities, and a full accounting of funds expended.
(C)The commission shall create the TNC Access for All Fund (Access Fund) and deposit moneys collected pursuant to subparagraph (B) in the Access Fund. The commission shall distribute funds in the Access Fund on a competitive basis to access providers that establish on-demand transportation programs or partnerships to meet the needs of persons with disabilities, including wheelchair users who need a WAV, in the geographic areas selected pursuant to subparagraph (D).
(D)The commission shall select geographic areas, which shall be based on the demand for WAVs within the area and selected according to outcomes of workshops in subparagraph (A), for inclusion in the on-demand transportation programs or partnerships funded pursuant to subparagraph (C). The commission shall allocate moneys in the Access Fund for use in each geographic area in a manner that is proportional to the percent of the Access Fund fees originating in that geographic area.
(E)The commission shall request access providers to submit applications to receive funds pursuant to subparagraph (C) by April 1, 2020. The commission may accept applications for new on-demand transportation programs or partnerships any time after April 1, 2020. From the applications that are submitted, the commission shall select by July 1, 2020, on-demand transportation programs or partnerships to receive funding based on criteria adopted by the commission in consultation with stakeholders described in subparagraph (A). As part of the criteria, the commission shall require an access provider to demonstrate in its application, at a minimum, how the program or partnership improves response times for WAV service compared to the previous year, the presence and availability of WAVs within the geographic area, and efforts undertaken to publicize and promote available WAV services to disability communities.
(F)The commission shall distribute funds pursuant to subparagraph (E) in the Access Fund within 90 days following the end of each year. If no access provider meets the requirements, funds shall remain in the Access Fund and be distributed the next year.
(G)The commission shall require each transportation network company to be accessible to persons with disabilities in order to be exempt from paying the charge required pursuant to subparagraph (B). The commission shall adopt a designated level of WAV service that is required to be met in each geographic area via a TNCs online-enabled application or platform in order for the TNC to be exempt from paying the fee required pursuant to subparagraph (B) for the next year in that geographic area. As part of the designated level of WAV service for each geographic area, the commission shall require a TNC, at a minimum, to have response times for 80 percent of WAV trips requested via the TNCs online-enabled application or platform within a time established by the commission for that geographic area. If a TNC meets the WAV service level requirement established pursuant to this subparagraph in a geographic area selected pursuant to subparagraph (D) for a particular year, the TNC shall be exempt from paying the fee imposed pursuant to subparagraph (B) for the next year for that geographic area only. A TNC may provide a higher level of service than the minimum service level requirement designated by the commission.
(H)A TNC may meet the requirements of clause (ii) of subparagraph (B) and subparagraph (G) by facilitating WAV service through its online-enabled application or platform, by directly providing WAV service with vehicles that it owns, or by a contract to provide WAV service with a transportation provider, or by any combination of these methods.
(I)Within 30 days after the end of each quarter, a transportation network company that receives an offset pursuant to clause (ii) of subparagraph (B) or an access provider that receives funding pursuant to subparagraph (C) shall submit a report to the commission. The report shall include, but shall not be limited to, all of the following:
(i)The number of WAV rides requested.
(ii)The number of WAV rides fulfilled.
(iii)Data detailing the response time between when a WAV ride was requested and when the vehicle arrived.
(iv)Information regarding educational outreach to disability communities, including, but not limited to, information and promotion of availability of WAVs for wheelchair users.
(v)A detailed description of expenditures or investments, as applicable.
(J)The commission shall establish yearly benchmarks for TNCs and access providers to meet to ensure WAV users receive continuously improved, reliable, and available service. These benchmarks shall include, but are not limited to, response times, percentage of trips fulfilled versus trips requested, and number of users requesting rides versus community WAV demand for each geographic area.
(K)The commission shall authorize no more than 2 percent of existing funds collected from TNCs pursuant to Section 421 and deposited into the Public Utilities Commission Transportation Reimbursement Account to be distributed to accessibility advocates who provide a substantial contribution to the proceeding initiated pursuant to this section, and only for the duration of the commission proceeding initiated pursuant to this section. These funds shall only be distributed to advocates for accessible transportation or representatives of a group whose membership uses accessible transportation. The commission shall distribute funds pursuant to this subparagraph in a manner consistent with the requirements of Sections 1803 to 1808, inclusive. The commission shall not increase the fees authorized pursuant to Section 421 in order to fulfill the requirements of this subparagraph. Nothing in this subparagraph is intended to allow parties to obtain intervenor compensation for other transportation proceedings at the commission.
(2)(A)Report to the Legislature by January 1, 2024, on compliance with this section and on the effectiveness of the on-demand transportation programs or partnerships funded pursuant to this section. The report shall include, but not be limited to, all of the following:
(i)A study on the demand for WAVs, including demand according to time of day and geographic area.
(ii)An analysis of the reports required to be submitted by access providers receiving funding pursuant to paragraph (1).
(iii)The availability of unallocated funds in the Access Fund, including the need to reassess Access Fund allocations.
(iv)An analysis of current program capabilities and deficiencies, and recommendations to overcome any identified deficiencies.
(B)The report required by this paragraph shall be submitted to the Legislature in compliance with Section 9795 of the Government Code.
(3)Create a working group with stakeholders described in subparagraph (A) of paragraph (1) to examine the variety of agencies, localities, and programs that provide transportation services for persons with disabilities, including passenger stage carriers and charter-party carriers within the commissions jurisdiction, in order to evaluate ways to partner with those agencies to provide services to disabled persons in a nonduplicative, nondiscriminatory, and more efficient manner.
(b)Notwithstanding Section 13340 of the Government Code, moneys deposited in the TNC Access for All Fund created pursuant to subparagraph (C) of paragraph (1) of subdivision (a) are continuously appropriated to the commission without regard to fiscal years for purposes of the program established pursuant to this section.
(c)The commission may hire an independent entity to administer the program established pursuant to subdivision (a) and to complete the report required pursuant to paragraph (2) of subdivision (a).
(d)This section does not limit the rights of any person to pursue any remedies or causes of action that they may have under any state or federal law to enforce compliance with those laws or the obligations stated in this section. This section does not expand or limit any obligations, if any, of a transportation network company under existing state or federal disability access laws.
(e)This section shall remain in effect only until January 1, 2032, and as of that date is repealed.
SEC. 4.SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SEC. 5.SEC. 4.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to ensure accountability of the Commissioners of the Public Utilities Commission and protect the fiscal stability of a transportation program for persons with disabilities, it is necessary that this act take effect immediately.
(a)The president of the commission shall annually appear before the appropriate policy committees of the Senate and Assembly to present the annual report of the commission required pursuant to Section 910.
(b)At the request of the chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the commission, a commissioner shall appear at a legislative hearing.
SEC. 2.Section 910.1 of the Public Utilities Code is amended to read:910.1.(a)The commission shall annually submit a report to the Legislature on the commissions timeliness in resolving cases, information on the disposition of applications for rehearings, and the days that commissioners presided in and attended hearings. The report shall include the number of scoping memos issued in each proceeding and the number of orders issued extending the statutory deadlines pursuant to subdivision (e) of Section 1701.2, for all adjudication cases, and pursuant to subdivision (a) of Section 1701.5, for all ratesetting or quasi-legislative cases.
(b)For reporting on commissioner attendance at hearings, the report shall include reporting based on attendance at all types of hearings, including by all of the following:
(1)Hearing type, including, but not limited to, prehearing conferences, evidentiary hearings, public participation hearings, and workshops.
(2)Proceeding type, including quasi-legislative, an adjudication, a rate-setting, or a catastrophic wildfire proceeding.
(3)Industry type, including electric, gas, water, telecommunications, or transportation.
SEC. 3.Section 2881 of the Public Utilities Code is amended to read:2881.(a)The commission shall design and implement a program to provide a telecommunications device capable of serving the needs of individuals who are deaf or hard of hearing, together with a single party line, at no charge additional to the basic exchange rate, to a subscriber who is certified as an individual who is deaf or hard of hearing by a licensed physician and surgeon, audiologist, or a qualified state or federal agency, as determined by the commission, and to a subscriber that is an organization representing individuals who are deaf or hard of hearing, as determined and specified by the commission pursuant to subdivision (h). A licensed hearing aid dispenser may certify the need of an individual to participate in the program if that individual has been previously fitted with an amplified device by the dispenser and the dispenser has the individuals hearing records on file before certification. In addition, a physician assistant or nurse practitioner may certify the needs of an individual who has been diagnosed by a physician and surgeon as being deaf or hard of hearing to participate in the program after reviewing the medical records or copies of the medical records containing that diagnosis.(b)The commission shall also design and implement a program to provide a dual-party relay system, using third-party intervention to connect individuals who are deaf or hard of hearing and offices of organizations representing individuals who are deaf or hard of hearing, as determined and specified by the commission pursuant to subdivision (h), with persons of normal hearing by way of intercommunications devices for individuals who are deaf or hard of hearing and the telephone system, making available reasonable access of all phases of public telephone service to telephone subscribers who are deaf or hard of hearing. In order to make a dual-party relay system that will meet the requirements of individuals who are deaf or hard of hearing available at a reasonable cost, the commission shall initiate an investigation, conduct public hearings to determine the most cost-effective method of providing dual-party relay service to the deaf or hard of hearing when using a telecommunications device, and solicit the advice, counsel, and physical assistance of statewide nonprofit consumer organizations of the deaf, during the development and implementation of the system. The commission shall apply for certification of this program under rules adopted by the Federal Communications Commission pursuant to Section 401 of the federal Americans with Disabilities Act of 1990 (Public Law 101-336).(c)The commission shall also design and implement a program whereby specialized or supplemental telephone communications equipment may be provided to subscribers who are certified to be disabled at no charge additional to the basic exchange rate. The certification, including a statement of visual or medical need for specialized telecommunications equipment, shall be provided by a licensed optometrist, physician and surgeon, physician assistant, or nurse practitioner, acting within the scope of practice of the applicable license, or by a qualified state or federal agency as determined by the commission. The commission shall, in this connection, study the feasibility of, and implement, if determined to be feasible, personal income criteria, in addition to the certification of disability, for determining a subscribers eligibility under this subdivision.(d)(1)The commission shall also design and implement a program to provide access to a speech-generating device to any subscriber who is certified as having a speech disability at no charge additional to the basic exchange rate. The certification shall be provided by a licensed physician, licensed speech-language pathologist, nurse practitioner, or qualified state or federal agency. The commission shall provide to a certified subscriber access to a speech-generating device that is all of the following:(A)A telecommunications device or a device that includes a telecommunications component.(B)Appropriate to meet the subscribers needs for access to, and use of, the telephone network, based on the recommendation of a licensed speech-language pathologist.(C)Consistent with the quality of speech-generating devices available for purchase in the state.(2)The commission shall adopt rules to implement this subdivision and subdivision (e) by January 1, 2014.(e)All of the following apply to any device or equipment described in this section that is classified as durable medical equipment under guidelines established by the United States Department of Health and Human Services:(1)It is the intent of the Legislature that the commission be the provider of last resort and that eligible subscribers first obtain coverage from any available public or private insurance.(2)The commission may require the subscriber to provide information about coverage for any or all of the cost of the device or equipment that is available from a public or private insurance, the cost to the subscriber of a deductible, copayment, or other relevant expense, and any related benefit cap information.(3)The total cost of a device or equipment provided to a subscriber under this section shall not exceed the rate of reimbursement provided by Medi-Cal for that device or equipment.(f)This section does not require the commission to provide training to a subscriber on the use of a speech-generating device.(g)(1)The commission shall administer a surcharge to collect revenues, subject to an annual appropriation of moneys by the Legislature, to allow providers of the equipment and service specified in subdivisions (a) to (d), inclusive, to recover costs as they are incurred under this section. The surcharge shall be in effect until January 1, 2031. The commission shall require that the programs implemented under this section be identified on subscribers bills, and shall establish a fund and require separate accounting for each of the programs implemented under this section.(2)The commission may collect a sum not to exceed one hundred million dollars ($100,000,000) per year by imposing the surcharge pursuant to paragraph (1).(h)The commission shall determine and specify those statewide organizations representing the deaf or hard of hearing that shall receive a telecommunications device pursuant to subdivision (a), or a dual-party relay system pursuant to subdivision (b), or both, and in which offices the equipment shall be installed in the case of an organization having more than one office.(i)The commission may direct a telephone corporation subject to its jurisdiction to comply with its determinations and specifications pursuant to this section.(j)The commission shall annually review the surcharge level and the balances in the funds established pursuant to subdivision (g). Until January 1, 2031, the commission may make, within the limits set by subdivision (g), necessary adjustments to the surcharge to ensure that the programs supported by the surcharge are adequately funded and that the fund balances are not excessive. A fund balance that is projected to exceed six months worth of projected expenses at the end of the fiscal year is excessive.(k)In order to continue to meet the access needs of individuals with functional limitations of hearing, vision, movement, manipulation, speech, and interpretation of information, the commission shall perform an ongoing assessment of, and, if appropriate, expand the scope of, the program to allow for additional access capability consistent with evolving telecommunications technology.(l)The commission shall structure the programs required by this section so that a charge imposed to promote the goals of universal service reasonably equals the value of the benefits of universal service to contributing entities and their subscribers.SEC. 4.SEC. 3.Section 5440.5 of the Public Utilities Code is amended to read:5440.5.(a)As part of the regulation of transportation network companies (TNCs) referenced in subdivision (a) of Section 5440, the commission shall do all of the following:
(1)In a new or existing proceeding, establish a program relating to accessibility for persons with disabilities, including wheelchair users who need a wheelchair-accessible vehicle (WAV). This program shall include, but is not limited to, all of the following:
(A)By January 1, 2019, the commission shall begin conducting workshops with stakeholders, including California cities and counties, disability rights organizations, persons with disabilities, transportation and transit agencies, social service transportation providers, paratransit coordinating councils, and transportation network companies, in order to determine community WAV demand and WAV supply and to develop and provide recommendations regarding the establishment of geographic areas, criteria for Access Fund expenditures, and educational outreach objectives for programs for on-demand services and partnerships consistent with the requirements of this section. The workshops may also examine topics including, but not limited to, vehicle specifications, subsidies for wheelchair pickups, maintenance and fuel costs, designated pickup locations for drivers in locations where door-to-door service is not feasible, standards for trip requests, response times, and rider initiated cancellation, limiting of stranded users, integration of service into city and county transportation plans, or any necessary training or additional incentives for WAV drivers that results in a measurable impact on service availability, efficiency, and efficacy. The commission shall conduct a minimum of five workshops throughout the state.
(B)(i)The commission shall require each TNC, by July 1, 2019, to pay on a quarterly basis to the commission an amount equivalent to, at minimum, five cents ($0.05) for each TNC trip completed using the transportation network companys online-enabled application or platform that originates in one of the geographic areas selected pursuant to subparagraph (D), except if the TNC meets the requirements of an exemption established by the commission pursuant to subparagraph (G). The commission may adjust the fee in each geographic area selected pursuant to subparagraph (D) to different levels based on the cost of providing adequate WAV service within the geographic area.
(ii)Each TNC shall charge its customers on each TNC trip completed the full amount of the per-trip fee established pursuant to this subparagraph, and remit the total amount of those fees charged to the commission each quarter. The commission shall authorize a TNC to offset against the amounts due pursuant to this subparagraph for a particular quarter the amounts spent by the TNC during that quarter to improve WAV service on its online-enabled application or platform for each geographic area and thereby reduce the amount required to be remitted to the commission. In order to offset amounts due pursuant to this subparagraph in a geographic area, the commission shall require a TNC, at a minimum, to demonstrate, in the geographic area, the presence and availability of drivers with WAVs on its online-enabled application or platform, improved level of service, including reasonable response times, due to those investments for WAV service compared to the previous quarter, efforts undertaken to publicize and promote available WAV services to disability communities, and a full accounting of funds expended.
(C)The commission shall create the TNC Access for All Fund (Access Fund) and deposit moneys collected pursuant to subparagraph (B) in the Access Fund. The commission shall distribute funds in the Access Fund on a competitive basis to access providers that establish on-demand transportation programs or partnerships to meet the needs of persons with disabilities, including wheelchair users who need a WAV, in the geographic areas selected pursuant to subparagraph (D).
(D)The commission shall select geographic areas, which shall be based on the demand for WAVs within the area and selected according to outcomes of workshops in subparagraph (A), for inclusion in the on-demand transportation programs or partnerships funded pursuant to subparagraph (C). The commission shall allocate moneys in the Access Fund for use in each geographic area in a manner that is proportional to the percent of the Access Fund fees originating in that geographic area.
(E)The commission shall request access providers to submit applications to receive funds pursuant to subparagraph (C) by April 1, 2020. The commission may accept applications for new on-demand transportation programs or partnerships any time after April 1, 2020. From the applications that are submitted, the commission shall select by July 1, 2020, on-demand transportation programs or partnerships to receive funding based on criteria adopted by the commission in consultation with stakeholders described in subparagraph (A). As part of the criteria, the commission shall require an access provider to demonstrate in its application, at a minimum, how the program or partnership improves response times for WAV service compared to the previous year, the presence and availability of WAVs within the geographic area, and efforts undertaken to publicize and promote available WAV services to disability communities.
(F)The commission shall distribute funds pursuant to subparagraph (E) in the Access Fund within 90 days following the end of each year. If no access provider meets the requirements, funds shall remain in the Access Fund and be distributed the next year.
(G)The commission shall require each transportation network company to be accessible to persons with disabilities in order to be exempt from paying the charge required pursuant to subparagraph (B). The commission shall adopt a designated level of WAV service that is required to be met in each geographic area via a TNCs online-enabled application or platform in order for the TNC to be exempt from paying the fee required pursuant to subparagraph (B) for the next year in that geographic area. As part of the designated level of WAV service for each geographic area, the commission shall require a TNC, at a minimum, to have response times for 80 percent of WAV trips requested via the TNCs online-enabled application or platform within a time established by the commission for that geographic area. If a TNC meets the WAV service level requirement established pursuant to this subparagraph in a geographic area selected pursuant to subparagraph (D) for a particular year, the TNC shall be exempt from paying the fee imposed pursuant to subparagraph (B) for the next year for that geographic area only. A TNC may provide a higher level of service than the minimum service level requirement designated by the commission.
(H)A TNC may meet the requirements of clause (ii) of subparagraph (B) and subparagraph (G) by facilitating WAV service through its online-enabled application or platform, by directly providing WAV service with vehicles that it owns, or by a contract to provide WAV service with a transportation provider, or by any combination of these methods.
(I)Within 30 days after the end of each quarter, a transportation network company that receives an offset pursuant to clause (ii) of subparagraph (B) or an access provider that receives funding pursuant to subparagraph (C) shall submit a report to the commission. The report shall include, but shall not be limited to, all of the following:
(i)The number of WAV rides requested.
(ii)The number of WAV rides fulfilled.
(iii)Data detailing the response time between when a WAV ride was requested and when the vehicle arrived.
(iv)Information regarding educational outreach to disability communities, including, but not limited to, information and promotion of availability of WAVs for wheelchair users.
(v)A detailed description of expenditures or investments, as applicable.
(J)The commission shall establish yearly benchmarks for TNCs and access providers to meet to ensure WAV users receive continuously improved, reliable, and available service. These benchmarks shall include, but are not limited to, response times, percentage of trips fulfilled versus trips requested, and number of users requesting rides versus community WAV demand for each geographic area.
(K)The commission shall authorize no more than 2 percent of existing funds collected from TNCs pursuant to Section 421 and deposited into the Public Utilities Commission Transportation Reimbursement Account to be distributed to accessibility advocates who provide a substantial contribution to the proceeding initiated pursuant to this section, and only for the duration of the commission proceeding initiated pursuant to this section. These funds shall only be distributed to advocates for accessible transportation or representatives of a group whose membership uses accessible transportation. The commission shall distribute funds pursuant to this subparagraph in a manner consistent with the requirements of Sections 1803 to 1808, inclusive. The commission shall not increase the fees authorized pursuant to Section 421 in order to fulfill the requirements of this subparagraph. Nothing in this subparagraph is intended to allow parties to obtain intervenor compensation for other transportation proceedings at the commission.
(2)(A)Report to the Legislature by January 1, 2024, on compliance with this section and on the effectiveness of the on-demand transportation programs or partnerships funded pursuant to this section. The report shall include, but not be limited to, all of the following:
(i)A study on the demand for WAVs, including demand according to time of day and geographic area.
(ii)An analysis of the reports required to be submitted by access providers receiving funding pursuant to paragraph (1).
(iii)The availability of unallocated funds in the Access Fund, including the need to reassess Access Fund allocations.
(iv)An analysis of current program capabilities and deficiencies, and recommendations to overcome any identified deficiencies.
(B)The report required by this paragraph shall be submitted to the Legislature in compliance with Section 9795 of the Government Code.
(3)Create a working group with stakeholders described in subparagraph (A) of paragraph (1) to examine the variety of agencies, localities, and programs that provide transportation services for persons with disabilities, including passenger stage carriers and charter-party carriers within the commissions jurisdiction, in order to evaluate ways to partner with those agencies to provide services to disabled persons in a nonduplicative, nondiscriminatory, and more efficient manner.
(b)Notwithstanding Section 13340 of the Government Code, moneys deposited in the TNC Access for All Fund created pursuant to subparagraph (C) of paragraph (1) of subdivision (a) are continuously appropriated to the commission without regard to fiscal years for purposes of the program established pursuant to this section.
(c)The commission may hire an independent entity to administer the program established pursuant to subdivision (a) and to complete the report required pursuant to paragraph (2) of subdivision (a).
(d)This section does not limit the rights of any person to pursue any remedies or causes of action that they may have under any state or federal law to enforce compliance with those laws or the obligations stated in this section. This section does not expand or limit any obligations, if any, of a transportation network company under existing state or federal disability access laws.
(e)This section shall remain in effect only until January 1, 2032, and as of that date is repealed.
SEC. 5.SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SEC. 6.SEC. 5.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to ensure accountability of commissioners the Commissioners of the Public Utilities Commission, avoid negative communication impacts on the deaf and disabled community, Commission and protect the fiscal stability of a transportation program for persons with disabilities, it is necessary that this act take effect immediately.
The commission shall adopt rules governing commissioner attendance at hearings.
SEC. 2.Section 321.6 of the Public Utilities Code is amended to read:321.6.(a)The president of the commission shall annually appear before the appropriate policy committees of the Senate and Assembly to present the annual report of the commission required pursuant to Section 910.
(b)At the request of the chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the commission, a commissioner shall appear at a legislative hearing.
SEC. 3.Section 2881 of the Public Utilities Code is amended to read:2881.(a)The commission shall design and implement a program to provide a telecommunications device capable of serving the needs of individuals who are deaf or hard of hearing, together with a single party line, at no charge additional to the basic exchange rate, to a subscriber who is certified as an individual who is deaf or hard of hearing by a licensed physician and surgeon, audiologist, or a qualified state or federal agency, as determined by the commission, and to a subscriber that is an organization representing individuals who are deaf or hard of hearing, as determined and specified by the commission pursuant to subdivision (h). A licensed hearing aid dispenser may certify the need of an individual to participate in the program if that individual has been previously fitted with an amplified device by the dispenser and the dispenser has the individuals hearing records on file before certification. In addition, a physician assistant or nurse practitioner may certify the needs of an individual who has been diagnosed by a physician and surgeon as being deaf or hard of hearing to participate in the program after reviewing the medical records or copies of the medical records containing that diagnosis.
(b)The commission shall also design and implement a program to provide a dual-party relay system, using third-party intervention to connect individuals who are deaf or hard of hearing and offices of organizations representing individuals who are deaf or hard of hearing, as determined and specified by the commission pursuant to subdivision (h), with persons of normal hearing by way of intercommunications devices for individuals who are deaf or hard of hearing and the telephone system, making available reasonable access of all phases of public telephone service to telephone subscribers who are deaf or hard of hearing. In order to make a dual-party relay system that will meet the requirements of individuals who are deaf or hard of hearing available at a reasonable cost, the commission shall initiate an investigation, conduct public hearings to determine the most cost-effective method of providing dual-party relay service to the deaf or hard of hearing when using a telecommunications device, and solicit the advice, counsel, and physical assistance of statewide nonprofit consumer organizations of the deaf, during the development and implementation of the system. The commission shall apply for certification of this program under rules adopted by the Federal Communications Commission pursuant to Section 401 of the federal Americans with Disabilities Act of 1990 (Public Law 101-336).
(c)The commission shall also design and implement a program whereby specialized or supplemental telephone communications equipment may be provided to subscribers who are certified to be disabled at no charge additional to the basic exchange rate. The certification, including a statement of visual or medical need for specialized telecommunications equipment, shall be provided by a licensed optometrist, physician and surgeon, physician assistant, or nurse practitioner, acting within the scope of practice of the applicable license, or by a qualified state or federal agency as determined by the commission. The commission shall, in this connection, study the feasibility of, and implement, if determined to be feasible, personal income criteria, in addition to the certification of disability, for determining a subscribers eligibility under this subdivision.
(d)(1)The commission shall also design and implement a program to provide access to a speech-generating device to any subscriber who is certified as having a speech disability at no charge additional to the basic exchange rate. The certification shall be provided by a licensed physician, licensed speech-language pathologist, nurse practitioner, or qualified state or federal agency. The commission shall provide to a certified subscriber access to a speech-generating device that is all of the following:
(A)A telecommunications device or a device that includes a telecommunications component.
(B)Appropriate to meet the subscribers needs for access to, and use of, the telephone network, based on the recommendation of a licensed speech-language pathologist.
(C)Consistent with the quality of speech-generating devices available for purchase in the state.
(2)The commission shall adopt rules to implement this subdivision and subdivision (e) by January 1, 2014.
(e)All of the following apply to any device or equipment described in this section that is classified as durable medical equipment under guidelines established by the United States Department of Health and Human Services:
(1)It is the intent of the Legislature that the commission be the provider of last resort and that eligible subscribers first obtain coverage from any available public or private insurance.
(2)The commission may require the subscriber to provide information about coverage for any or all of the cost of the device or equipment that is available from a public or private insurance, the cost to the subscriber of a deductible, copayment, or other relevant expense, and any related benefit cap information.
(3)The total cost of a device or equipment provided to a subscriber under this section shall not exceed the rate of reimbursement provided by Medi-Cal for that device or equipment.
(f)This section does not require the commission to provide training to a subscriber on the use of a speech-generating device.
(g)(1)The commission shall administer a surcharge to collect revenues, subject to an annual appropriation of moneys by the Legislature, to allow providers of the equipment and service specified in subdivisions (a) to (d), inclusive, to recover costs as they are incurred under this section. The surcharge shall be in effect until January 1, 2031. The commission shall require that the programs implemented under this section be identified on subscribers bills, and shall establish a fund and require separate accounting for each of the programs implemented under this section.
(2)The commission may collect a sum not to exceed one hundred million dollars ($100,000,000) per year by imposing the surcharge pursuant to paragraph (1).
(h)The commission shall determine and specify those statewide organizations representing the deaf or hard of hearing that shall receive a telecommunications device pursuant to subdivision (a), or a dual-party relay system pursuant to subdivision (b), or both, and in which offices the equipment shall be installed in the case of an organization having more than one office.
(i)The commission may direct a telephone corporation subject to its jurisdiction to comply with its determinations and specifications pursuant to this section.
(j)The commission shall annually review the surcharge level and the balances in the funds established pursuant to subdivision (g). Until January 1, 2031, the commission may make, within the limits set by subdivision (g), necessary adjustments to the surcharge to ensure that the programs supported by the surcharge are adequately funded and that the fund balances are not excessive. A fund balance that is projected to exceed six months worth of projected expenses at the end of the fiscal year is excessive.
(k)In order to continue to meet the access needs of individuals with functional limitations of hearing, vision, movement, manipulation, speech, and interpretation of information, the commission shall perform an ongoing assessment of, and, if appropriate, expand the scope of, the program to allow for additional access capability consistent with evolving telecommunications technology.
(l)The commission shall structure the programs required by this section so that a charge imposed to promote the goals of universal service reasonably equals the value of the benefits of universal service to contributing entities and their subscribers.
SEC. 4.Section 5440.5 of the Public Utilities Code is amended to read:5440.5.(a)As part of the regulation of transportation network companies (TNCs) referenced in subdivision (a) of Section 5440, the commission shall do all of the following:
(1)In a new or existing proceeding, establish a program relating to accessibility for persons with disabilities, including wheelchair users who need a wheelchair-accessible vehicle (WAV). This program shall include, but is not limited to, all of the following:
(A)By January 1, 2019, the commission shall begin conducting workshops with stakeholders, including California cities and counties, disability rights organizations, persons with disabilities, transportation and transit agencies, social service transportation providers, paratransit coordinating councils, and transportation network companies, in order to determine community WAV demand and WAV supply and to develop and provide recommendations regarding the establishment of geographic areas, criteria for Access Fund expenditures, and educational outreach objectives for programs for on-demand services and partnerships consistent with the requirements of this section. The workshops may also examine topics including, but not limited to, vehicle specifications, subsidies for wheelchair pickups, maintenance and fuel costs, designated pickup locations for drivers in locations where door-to-door service is not feasible, standards for trip requests, response times, and rider initiated cancellation, limiting of stranded users, integration of service into city and county transportation plans, or any necessary training or additional incentives for WAV drivers that results in a measurable impact on service availability, efficiency, and efficacy. The commission shall conduct a minimum of five workshops throughout the state.
(B)(i)The commission shall require each TNC, by July 1, 2019, to pay on a quarterly basis to the commission an amount equivalent to, at minimum, five cents ($0.05) for each TNC trip completed using the transportation network companys online-enabled application or platform that originates in one of the geographic areas selected pursuant to subparagraph (D), except if the TNC meets the requirements of an exemption established by the commission pursuant to subparagraph (G). The commission may adjust the fee in each geographic area selected pursuant to subparagraph (D) to different levels based on the cost of providing adequate WAV service within the geographic area.
(ii)Each TNC shall charge its customers on each TNC trip completed the full amount of the per-trip fee established pursuant to this subparagraph, and remit the total amount of those fees charged to the commission each quarter. The commission shall authorize a TNC to offset against the amounts due pursuant to this subparagraph for a particular quarter the amounts spent by the TNC during that quarter to improve WAV service on its online-enabled application or platform for each geographic area and thereby reduce the amount required to be remitted to the commission. In order to offset amounts due pursuant to this subparagraph in a geographic area, the commission shall require a TNC, at a minimum, to demonstrate, in the geographic area, the presence and availability of drivers with WAVs on its online-enabled application or platform, improved level of service, including reasonable response times, due to those investments for WAV service compared to the previous quarter, efforts undertaken to publicize and promote available WAV services to disability communities, and a full accounting of funds expended.
(C)The commission shall create the TNC Access for All Fund (Access Fund) and deposit moneys collected pursuant to subparagraph (B) in the Access Fund. The commission shall distribute funds in the Access Fund on a competitive basis to access providers that establish on-demand transportation programs or partnerships to meet the needs of persons with disabilities, including wheelchair users who need a WAV, in the geographic areas selected pursuant to subparagraph (D).
(D)The commission shall select geographic areas, which shall be based on the demand for WAVs within the area and selected according to outcomes of workshops in subparagraph (A), for inclusion in the on-demand transportation programs or partnerships funded pursuant to subparagraph (C). The commission shall allocate moneys in the Access Fund for use in each geographic area in a manner that is proportional to the percent of the Access Fund fees originating in that geographic area.
(E)The commission shall request access providers to submit applications to receive funds pursuant to subparagraph (C) by April 1, 2020. The commission may accept applications for new on-demand transportation programs or partnerships any time after April 1, 2020. From the applications that are submitted, the commission shall select by July 1, 2020, on-demand transportation programs or partnerships to receive funding based on criteria adopted by the commission in consultation with stakeholders described in subparagraph (A). As part of the criteria, the commission shall require an access provider to demonstrate in its application, at a minimum, how the program or partnership improves response times for WAV service compared to the previous year, the presence and availability of WAVs within the geographic area, and efforts undertaken to publicize and promote available WAV services to disability communities.
(F)The commission shall distribute funds pursuant to subparagraph (E) in the Access Fund within 90 days following the end of each year. If no access provider meets the requirements, funds shall remain in the Access Fund and be distributed the next year.
(G)The commission shall require each transportation network company to be accessible to persons with disabilities in order to be exempt from paying the charge required pursuant to subparagraph (B). The commission shall adopt a designated level of WAV service that is required to be met in each geographic area via a TNCs online-enabled application or platform in order for the TNC to be exempt from paying the fee required pursuant to subparagraph (B) for the next year in that geographic area. As part of the designated level of WAV service for each geographic area, the commission shall require a TNC, at a minimum, to have response times for 80 percent of WAV trips requested via the TNCs online-enabled application or platform within a time established by the commission for that geographic area. If a TNC meets the WAV service level requirement established pursuant to this subparagraph in a geographic area selected pursuant to subparagraph (D) for a particular year, the TNC shall be exempt from paying the fee imposed pursuant to subparagraph (B) for the next year for that geographic area only. A TNC may provide a higher level of service than the minimum service level requirement designated by the commission.
(H)A TNC may meet the requirements of clause (ii) of subparagraph (B) and subparagraph (G) by facilitating WAV service through its online-enabled application or platform, by directly providing WAV service with vehicles that it owns, or by a contract to provide WAV service with a transportation provider, or by any combination of these methods.
(I)Within 30 days after the end of each quarter, a transportation network company that receives an offset pursuant to clause (ii) of subparagraph (B) or an access provider that receives funding pursuant to subparagraph (C) shall submit a report to the commission. The report shall include, but shall not be limited to, all of the following:
(i)The number of WAV rides requested.
(ii)The number of WAV rides fulfilled.
(iii)Data detailing the response time between when a WAV ride was requested and when the vehicle arrived.
(iv)Information regarding educational outreach to disability communities, including, but not limited to, information and promotion of availability of WAVs for wheelchair users.
(v)A detailed description of expenditures or investments, as applicable.
(J)The commission shall establish yearly benchmarks for TNCs and access providers to meet to ensure WAV users receive continuously improved, reliable, and available service. These benchmarks shall include, but are not limited to, response times, percentage of trips fulfilled versus trips requested, and number of users requesting rides versus community WAV demand for each geographic area.
(K)The commission shall authorize no more than 2 percent of existing funds collected from TNCs pursuant to Section 421 and deposited into the Public Utilities Commission Transportation Reimbursement Account to be distributed to accessibility advocates who provide a substantial contribution to the proceeding initiated pursuant to this section, and only for the duration of the commission proceeding initiated pursuant to this section. These funds shall only be distributed to advocates for accessible transportation or representatives of a group whose membership uses accessible transportation. The commission shall distribute funds pursuant to this subparagraph in a manner consistent with the requirements of Sections 1803 to 1808, inclusive. The commission shall not increase the fees authorized pursuant to Section 421 in order to fulfill the requirements of this subparagraph. Nothing in this subparagraph is intended to allow parties to obtain intervenor compensation for other transportation proceedings at the commission.
(2)(A)Report to the Legislature by January 1, 2024, on compliance with this section and on the effectiveness of the on-demand transportation programs or partnerships funded pursuant to this section. The report shall include, but not be limited to, all of the following:
(i)A study on the demand for WAVs, including demand according to time of day and geographic area.
(ii)An analysis of the reports required to be submitted by access providers receiving funding pursuant to paragraph (1).
(iii)The availability of unallocated funds in the Access Fund, including the need to reassess Access Fund allocations.
(iv)An analysis of current program capabilities and deficiencies, and recommendations to overcome any identified deficiencies.
(B)The report required by this paragraph shall be submitted to the Legislature in compliance with Section 9795 of the Government Code.
(3)Create a working group with stakeholders described in subparagraph (A) of paragraph (1) to examine the variety of agencies, localities, and programs that provide transportation services for persons with disabilities, including passenger stage carriers and charter-party carriers within the commissions jurisdiction, in order to evaluate ways to partner with those agencies to provide services to disabled persons in a nonduplicative, nondiscriminatory, and more efficient manner.
(b)Notwithstanding Section 13340 of the Government Code, moneys deposited in the TNC Access for All Fund created pursuant to subparagraph (C) of paragraph (1) of subdivision (a) are continuously appropriated to the commission without regard to fiscal years for purposes of the program established pursuant to this section.
(c)The commission may hire an independent entity to administer the program established pursuant to subdivision (a) and to complete the report required pursuant to paragraph (2) of subdivision (a).
(d)This section does not limit the rights of any person to pursue any remedies or causes of action that they may have under any state or federal law to enforce compliance with those laws or the obligations stated in this section. This section does not expand or limit any obligations, if any, of a transportation network company under existing state or federal disability access laws.
(e)This section shall remain in effect only until January 1, 2032, and as of that date is repealed.
SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SEC. 6.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to ensure accountability of commissioners of the Public Utilities Commission, avoid negative communication impacts on the deaf and disabled community, and protect the fiscal stability of a transportation program for persons with disabilities, it is necessary that this act take effect immediately.
The commission shall adopt rules governing commissioner attendance at hearings.
SEC. 3.Section 304.7 is added to the Public Utilities Code, to read:304.7.(a)On or before January 1, 2027, the Milton Marks Little Hoover Commission on California State Government Organization and Economy shall submit a report with recommendations to the Legislature and the Governor for increasing commissioner attendance at commission hearings and improving the commissions timelines in resolving proceedings.(b)The report shall include an analysis of all of the following topics:(1)Commissioner attendance at quasi-legislative, adjudication, ratesetting, and catastrophic wildfire proceedings.(2)Commissioner attendance at hearings in proceedings that resulted in a rate increase for ratepayers.(3)Hearings in which the commissioner was the presiding officer.(4)Commissioner attendance at hearings specific to the telecommunications, broadband, transportation, or railroad industry.(c)The report shall evaluate whether a reorganization of the commissions work and jurisdiction not related to electrical or gas corporations would result in ratepayer cost savings, savings to the General Fund, increased commissioner attendance at hearings, or more timely disposition of proceedings.(d)(1)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code.(2)Pursuant to Section 10231.5 of the Government Code, this section is repealed on January 1, 2030.SEC. 4.SEC. 2.Section 321.6 of the Public Utilities Code is amended to read:321.6.(a)The president of the commission shall annually appear before the appropriate policy committees of the Senate and Assembly to present the annual report of the commission required pursuant to Section 910.
(b)At the request of the chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the commission, a commissioner shall appear at a legislative hearing.
SEC. 5.SEC. 3.Section 2881 of the Public Utilities Code is amended to read:2881.(a)The commission shall design and implement a program to provide a telecommunications device capable of serving the needs of individuals who are deaf or hard of hearing, together with a single party line, at no charge additional to the basic exchange rate, to a subscriber who is certified as an individual who is deaf or hard of hearing by a licensed physician and surgeon, audiologist, or a qualified state or federal agency, as determined by the commission, and to a subscriber that is an organization representing individuals who are deaf or hard of hearing, as determined and specified by the commission pursuant to subdivision (h). A licensed hearing aid dispenser may certify the need of an individual to participate in the program if that individual has been previously fitted with an amplified device by the dispenser and the dispenser has the individuals hearing records on file before certification. In addition, a physician assistant or nurse practitioner may certify the needs of an individual who has been diagnosed by a physician and surgeon as being deaf or hard of hearing to participate in the program after reviewing the medical records or copies of the medical records containing that diagnosis.
(b)The commission shall also design and implement a program to provide a dual-party relay system, using third-party intervention to connect individuals who are deaf or hard of hearing and offices of organizations representing individuals who are deaf or hard of hearing, as determined and specified by the commission pursuant to subdivision (h), with persons of normal hearing by way of intercommunications devices for individuals who are deaf or hard of hearing and the telephone system, making available reasonable access of all phases of public telephone service to telephone subscribers who are deaf or hard of hearing. In order to make a dual-party relay system that will meet the requirements of individuals who are deaf or hard of hearing available at a reasonable cost, the commission shall initiate an investigation, conduct public hearings to determine the most cost-effective method of providing dual-party relay service to the deaf or hard of hearing when using a telecommunications device, and solicit the advice, counsel, and physical assistance of statewide nonprofit consumer organizations of the deaf, during the development and implementation of the system. The commission shall apply for certification of this program under rules adopted by the Federal Communications Commission pursuant to Section 401 of the federal Americans with Disabilities Act of 1990 (Public Law 101-336).
(c)The commission shall also design and implement a program whereby specialized or supplemental telephone communications equipment may be provided to subscribers who are certified to be disabled at no charge additional to the basic exchange rate. The certification, including a statement of visual or medical need for specialized telecommunications equipment, shall be provided by a licensed optometrist, physician and surgeon, physician assistant, or nurse practitioner, acting within the scope of practice of the applicable license, or by a qualified state or federal agency as determined by the commission. The commission shall, in this connection, study the feasibility of, and implement, if determined to be feasible, personal income criteria, in addition to the certification of disability, for determining a subscribers eligibility under this subdivision.
(d)(1)The commission shall also design and implement a program to provide access to a speech-generating device to any subscriber who is certified as having a speech disability at no charge additional to the basic exchange rate. The certification shall be provided by a licensed physician, licensed speech-language pathologist, nurse practitioner, or qualified state or federal agency. The commission shall provide to a certified subscriber access to a speech-generating device that is all of the following:
(A)A telecommunications device or a device that includes a telecommunications component.
(B)Appropriate to meet the subscribers needs for access to, and use of, the telephone network, based on the recommendation of a licensed speech-language pathologist.
(C)Consistent with the quality of speech-generating devices available for purchase in the state.
(2)The commission shall adopt rules to implement this subdivision and subdivision (e) by January 1, 2014.
(e)All of the following apply to any device or equipment described in this section that is classified as durable medical equipment under guidelines established by the United States Department of Health and Human Services:
(1)It is the intent of the Legislature that the commission be the provider of last resort and that eligible subscribers first obtain coverage from any available public or private insurance.
(2)The commission may require the subscriber to provide information about coverage for any or all of the cost of the device or equipment that is available from a public or private insurance, the cost to the subscriber of a deductible, copayment, or other relevant expense, and any related benefit cap information.
(3)The total cost of a device or equipment provided to a subscriber under this section shall not exceed the rate of reimbursement provided by Medi-Cal for that device or equipment.
(f)This section does not require the commission to provide training to a subscriber on the use of a speech-generating device.
(g)(1)The commission shall administer a surcharge to collect revenues, subject to an annual appropriation of moneys by the Legislature, to allow providers of the equipment and service specified in subdivisions (a) to (d), inclusive, to recover costs as they are incurred under this section. The surcharge shall be in effect until January 1, 2031. The commission shall require that the programs implemented under this section be identified on subscribers bills, and shall establish a fund and require separate accounting for each of the programs implemented under this section.
(2)The commission may collect a sum not to exceed one hundred million dollars ($100,000,000) per year by imposing the surcharge pursuant to paragraph (1).
(h)The commission shall determine and specify those statewide organizations representing the deaf or hard of hearing that shall receive a telecommunications device pursuant to subdivision (a), or a dual-party relay system pursuant to subdivision (b), or both, and in which offices the equipment shall be installed in the case of an organization having more than one office.
(i)The commission may direct a telephone corporation subject to its jurisdiction to comply with its determinations and specifications pursuant to this section.
(j)The commission shall annually review the surcharge level and the balances in the funds established pursuant to subdivision (g). Until January 1, 2031, the commission may make, within the limits set by subdivision (g), necessary adjustments to the surcharge to ensure that the programs supported by the surcharge are adequately funded and that the fund balances are not excessive. A fund balance that is projected to exceed six months worth of projected expenses at the end of the fiscal year is excessive.
(k)In order to continue to meet the access needs of individuals with functional limitations of hearing, vision, movement, manipulation, speech, and interpretation of information, the commission shall perform an ongoing assessment of, and and, if appropriate, expand the scope of, the program to allow for additional access capability consistent with evolving telecommunications technology.
(l)The commission shall structure the programs required by this section so that a charge imposed to promote the goals of universal service reasonably equals the value of the benefits of universal service to contributing entities and their subscribers.
SEC. 6.SEC. 4.Section 5440.5 of the Public Utilities Code is amended to read:5440.5.(a)As part of the regulation of transportation network companies (TNCs) referenced in subdivision (a) of Section 5440, the commission shall do all of the following:
(1)In a new or existing proceeding, establish a program relating to accessibility for persons with disabilities, including wheelchair users who need a wheelchair-accessible vehicle (WAV). This program shall include, but is not limited to, all of the following:
(A)By January 1, 2019, the commission shall begin conducting workshops with stakeholders, including California cities and counties, disability rights organizations, persons with disabilities, transportation and transit agencies, social service transportation providers, paratransit coordinating councils, and transportation network companies, in order to determine community WAV demand and WAV supply and to develop and provide recommendations regarding the establishment of geographic areas, criteria for Access Fund expenditures, and educational outreach objectives for programs for on-demand services and partnerships consistent with the requirements of this section. The workshops may also examine topics including, but not limited to, vehicle specifications, subsidies for wheelchair pickups, maintenance and fuel costs, designated pickup locations for drivers in locations where door-to-door service is not feasible, standards for trip requests, response times, and rider initiated cancellation, limiting of stranded users, integration of service into city and county transportation plans, or any necessary training or additional incentives for WAV drivers that results in a measurable impact on service availability, efficiency, and efficacy. The commission shall conduct a minimum of five workshops throughout the state.
(B)(i)The commission shall require each TNC, by July 1, 2019, to pay on a quarterly basis to the commission an amount equivalent to, at minimum, 0.05 dollars five cents ($0.05) for each TNC trip completed using the transportation network companys online-enabled application or platform that originates in one of the geographic areas selected pursuant to subparagraph (D), except if the TNC meets the requirements of an exemption established by the commission pursuant to subparagraph (G). The commission may adjust the fee in each geographic area selected pursuant to subparagraph (D) to different levels based on the cost of providing adequate WAV service within the geographic area.
(ii)Each TNC shall charge its customers on each TNC trip completed the full amount of the per-trip fee established pursuant to this subparagraph, and remit the total amount of those fees charged to the commission each quarter. The commission shall authorize a TNC to offset against the amounts due pursuant to this subparagraph for a particular quarter the amounts spent by the TNC during that quarter to improve WAV service on its online-enabled application or platform for each geographic area and thereby reduce the amount required to be remitted to the commission. In order to offset amounts due pursuant to this subparagraph in a geographic area, the commission shall require a TNC, at a minimum, to demonstrate, in the geographic area, the presence and availability of drivers with WAVs on its online-enabled application or platform, improved level of service, including reasonable response times, due to those investments for WAV service compared to the previous quarter, efforts undertaken to publicize and promote available WAV services to disability communities, and a full accounting of funds expended.
(C)The commission shall create the TNC Access for All Fund (Access Fund) and deposit moneys collected pursuant to subparagraph (B) in the Access Fund. The commission shall distribute funds in the Access Fund on a competitive basis to access providers that establish on-demand transportation programs or partnerships to meet the needs of persons with disabilities, including wheelchair users who need a WAV, in the geographic areas selected pursuant to subparagraph (D).
(D)The commission shall select geographic areas, which shall be based on the demand for WAVs within the area and selected according to outcomes of workshops in subparagraph (A), for inclusion in the on-demand transportation programs or partnerships funded pursuant to subparagraph (C). The commission shall allocate moneys in the Access Fund for use in each geographic area in a manner that is proportional to the percent of the Access Fund fees originating in that geographic area.
(E)The commission shall request access providers to submit applications to receive funds pursuant to subparagraph (C) by April 1, 2020. The commission may accept applications for new on-demand transportation programs or partnerships any time after April 1, 2020. From the applications that are submitted, the commission shall select by July 1, 2020, on-demand transportation programs or partnerships to receive funding based on criteria adopted by the commission in consultation with stakeholders described in subparagraph (A). As part of the criteria, the commission shall require an access provider to demonstrate in its application, at a minimum, how the program or partnership improves response times for WAV service compared to the previous year, the presence and availability of WAVs within the geographic area, and efforts undertaken to publicize and promote available WAV services to disability communities.
(F)The commission shall distribute funds pursuant to subparagraph (E) in the Access Fund within 90 days following the end of each year. If no access provider meets the requirements, funds shall remain in the Access Fund and be distributed the next year.
(G)The commission shall require each transportation network company to be accessible to persons with disabilities in order to be exempt from paying the charge required pursuant to subparagraph (B). The commission shall adopt a designated level of WAV service that is required to be met in each geographic area via a TNCs online-enabled application or platform in order for the TNC to be exempt from paying the fee required pursuant to subparagraph (B) for the next year in that geographic area. As part of the designated level of WAV service for each geographic area, the commission shall require a TNC, at a minimum, to have response times for 80 percent of WAV trips requested via the TNCs online-enabled application or platform within a time established by the commission for that geographic area. If a TNC meets the WAV service level requirement established pursuant to this subparagraph in a geographic area selected pursuant to subparagraph (D) for a particular year, the TNC shall be exempt from paying the fee imposed pursuant to subparagraph (B) for the next year for that geographic area only. A TNC may provide a higher level of service than the minimum service level requirement designated by the commission.
(H)A TNC may meet the requirements of clause (ii) of subparagraph (B) and subparagraph (G) by facilitating WAV service through its online-enabled application or platform, by directly providing WAV service with vehicles that it owns, or by a contract to provide WAV service with a transportation provider, or by any combination of these methods.
(I)Within 30 days after the end of each quarter, a transportation network company that receives an offset pursuant to clause (ii) of subparagraph (B) or an access provider that receives funding pursuant to subparagraph (C) shall submit a report to the commission. The report shall include, but shall not be limited to, all of the following:
(i)The number of WAV rides requested.
(ii)The number of WAV rides fulfilled.
(iii)Data detailing the response time between when a WAV ride was requested and when the vehicle arrived.
(iv)Information regarding educational outreach to disability communities, including, but not limited to, information and promotion of availability of WAVs for wheelchair users.
(v)A detailed description of expenditures or investments, as applicable.
(J)The commission shall establish yearly benchmarks for TNCs and access providers to meet to ensure WAV users receive continuously improved, reliable, and available service. These benchmarks shall include, but are not limited to, response times, percentage of trips fulfilled versus trips requested, and number of users requesting rides versus community WAV demand for each geographic area.
(K)The commission shall authorize no more than 2 percent of existing funds collected from TNCs pursuant to Section 421 and deposited into the Public Utilities Commission Transportation Reimbursement Account to be distributed to accessibility advocates who provide a substantial contribution to the proceeding initiated pursuant to this section, and only for the duration of the commission proceeding initiated pursuant to this section. These funds shall only be distributed to advocates for accessible transportation or representatives of a group whose membership uses accessible transportation. The commission shall distribute funds pursuant to this subparagraph in a manner consistent with the requirements of Sections 1803 to 1808, inclusive. The commission shall not increase the fees authorized pursuant to Section 421 in order to fulfill the requirements of this subparagraph. Nothing in this subparagraph is intended to allow parties to obtain intervenor compensation for other transportation proceedings at the commission.
(2)(A)Report to the Legislature by January 1, 2024, on compliance with this section and on the effectiveness of the on-demand transportation programs or partnerships funded pursuant to this section. The report shall include, but not be limited to, all of the following:
(i)A study on the demand for WAVs, including demand according to time of day and geographic area.
(ii)An analysis of the reports required to be submitted by access providers receiving funding pursuant to paragraph (1).
(iii)The availability of unallocated funds in the Access Fund, including the need to reassess Access Fund allocations.
(iv)An analysis of current program capabilities and deficiencies, and recommendations to overcome any identified deficiencies.
(B)The report required by this paragraph shall be submitted to the Legislature in compliance with Section 9795 of the Government Code.
(3)Create a working group with stakeholders described in subparagraph (A) of paragraph (1) to examine the variety of agencies, localities, and programs that provide transportation services for persons with disabilities, including passenger stage carriers and charter-party carriers within the commissions jurisdiction, in order to evaluate ways to partner with those agencies to provide services to disabled persons in a nonduplicative, nondiscriminatory, and more efficient manner.
(b)Notwithstanding Section 13340 of the Government Code, moneys deposited in the TNC Access for All Fund created pursuant to subparagraph (C) of paragraph (1) of subdivision (a) are continuously appropriated to the commission without regard to fiscal years for purposes of the program established pursuant to this section.
(c)The commission may hire an independent entity to administer the program established pursuant to subdivision (a) and to complete the report required pursuant to paragraph (2) of subdivision (a).
(d)This section does not limit the rights of any person to pursue any remedies or causes of action that they may have under any state or federal law to enforce compliance with those laws or the obligations stated in this section. This section does not expand or limit any obligations, if any, of a transportation network company under existing state or federal disability access laws.
(e)This section shall remain in effect only until January 1, 2032, and as of that date is repealed.
SEC. 7.SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The annual salary of each commissioner is provided for by Chapter 6 (commencing with Section 11550) of Part 1 of Division 3 of Title 2 of the Government Code. The commissioners shall be civil executive officers, and their salaries as fixed by law shall be paid in the same manner as are the salaries of other state officers.
(b)In order to receive the annual salary provided for in subdivision (a), a commissioner, following their first year as a commissioner, shall attend no less than 25 percent of the hearings that are part of a ratesetting proceeding in the preceding year.
SEC. 2.Section 304.5 is added to the Public Utilities Code, to read:304.5.The commission shall adopt rules governing commissioner attendance at hearings.
SEC. 3.Section 304.7 is added to the Public Utilities Code, to read:304.7.(a)On or before January 1, 2027, the Milton Marks Little Hoover Commission on California State Government Organization and Economy shall submit a report with recommendations to the Legislature and the Governor for increasing commissioner attendance at commission hearings and improving the commissions timelines in resolving proceedings.
(b)The report shall include an analysis of all of the following topics:
(1)Commissioner attendance at quasi-legislative, adjudication, ratesetting, and catastrophic wildfire proceedings.
(2)Commissioner attendance at hearings in proceedings that resulted in a rate increase for ratepayers.
(3)Hearings in which the commissioner was the presiding officer.
(4)Commissioner attendance at hearings specific to the telecommunications, broadband, transportation, or railroad industry.
(c)The report shall evaluate whether a reorganization of the commissions work and jurisdiction not related to electrical or gas corporations would result in ratepayer cost savings, savings to the General Fund, increased commissioner attendance at hearings, or more timely disposition of proceedings.
(d)(1)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code.
(2)Pursuant to Section 10231.5 of the Government Code, this section is repealed on January 1, 2030.
SEC. 4.Section 321.6 of the Public Utilities Code is amended to read:321.6.(a)The president of the commission shall annually appear before the appropriate policy committees of the Senate and Assembly to present the annual report of the commission required pursuant to Section 910.
(b)At the request of the chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the commission, a commissioner shall appear at a legislative hearing.
SEC. 5.Section 2881 of the Public Utilities Code is amended to read:2881.(a)The commission shall design and implement a program to provide a telecommunications device capable of serving the needs of individuals who are deaf or hard of hearing, together with a single party line, at no charge additional to the basic exchange rate, to a subscriber who is certified as an individual who is deaf or hard of hearing by a licensed physician and surgeon, audiologist, or a qualified state or federal agency, as determined by the commission, and to a subscriber that is an organization representing individuals who are deaf or hard of hearing, as determined and specified by the commission pursuant to subdivision (h). A licensed hearing aid dispenser may certify the need of an individual to participate in the program if that individual has been previously fitted with an amplified device by the dispenser and the dispenser has the individuals hearing records on file before certification. In addition, a physician assistant or nurse practitioner may certify the needs of an individual who has been diagnosed by a physician and surgeon as being deaf or hard of hearing to participate in the program after reviewing the medical records or copies of the medical records containing that diagnosis.
(b)The commission shall also design and implement a program to provide a dual-party relay system, using third-party intervention to connect individuals who are deaf or hard of hearing and offices of organizations representing individuals who are deaf or hard of hearing, as determined and specified by the commission pursuant to subdivision (h), with persons of normal hearing by way of intercommunications devices for individuals who are deaf or hard of hearing and the telephone system, making available reasonable access of all phases of public telephone service to telephone subscribers who are deaf or hard of hearing. In order to make a dual-party relay system that will meet the requirements of individuals who are deaf or hard of hearing available at a reasonable cost, the commission shall initiate an investigation, conduct public hearings to determine the most cost-effective method of providing dual-party relay service to the deaf or hard of hearing when using a telecommunications device, and solicit the advice, counsel, and physical assistance of statewide nonprofit consumer organizations of the deaf, during the development and implementation of the system. The commission shall apply for certification of this program under rules adopted by the Federal Communications Commission pursuant to Section 401 of the federal Americans with Disabilities Act of 1990 (Public Law 101-336).
(c)The commission shall also design and implement a program whereby specialized or supplemental telephone communications equipment may be provided to subscribers who are certified to be disabled at no charge additional to the basic exchange rate. The certification, including a statement of visual or medical need for specialized telecommunications equipment, shall be provided by a licensed optometrist, physician and surgeon, physician assistant, or nurse practitioner, acting within the scope of practice of the applicable license, or by a qualified state or federal agency as determined by the commission. The commission shall, in this connection, study the feasibility of, and implement, if determined to be feasible, personal income criteria, in addition to the certification of disability, for determining a subscribers eligibility under this subdivision.
(d)(1)The commission shall also design and implement a program to provide access to a speech-generating device to any subscriber who is certified as having a speech disability at no charge additional to the basic exchange rate. The certification shall be provided by a licensed physician, licensed speech-language pathologist, nurse practitioner, or qualified state or federal agency. The commission shall provide to a certified subscriber access to a speech-generating device that is all of the following:
(A)A telecommunications device or a device that includes a telecommunications component.
(B)Appropriate to meet the subscribers needs for access to, and use of, the telephone network, based on the recommendation of a licensed speech-language pathologist.
(C)Consistent with the quality of speech-generating devices available for purchase in the state.
(2)The commission shall adopt rules to implement this subdivision and subdivision (e) by January 1, 2014.
(e)All of the following apply to any device or equipment described in this section that is classified as durable medical equipment under guidelines established by the United States Department of Health and Human Services:
(1)It is the intent of the Legislature that the commission be the provider of last resort and that eligible subscribers first obtain coverage from any available public or private insurance.
(2)The commission may require the subscriber to provide information about coverage for any or all of the cost of the device or equipment that is available from a public or private insurance, the cost to the subscriber of a deductible, copayment, or other relevant expense, and any related benefit cap information.
(3)The total cost of a device or equipment provided to a subscriber under this section shall not exceed the rate of reimbursement provided by Medi-Cal for that device or equipment.
(f)This section does not require the commission to provide training to a subscriber on the use of a speech-generating device.
(g)(1)The commission shall administer a surcharge to collect revenues, subject to an annual appropriation of moneys by the Legislature, to allow providers of the equipment and service specified in subdivisions (a) to (d), inclusive, to recover costs as they are incurred under this section. The surcharge shall be in effect until January 1, 2025. 2031. The commission shall require that the programs implemented under this section be identified on subscribers bills, and shall establish a fund and require separate accounting for each of the programs implemented under this section.
(2)The commission may collect a sum not to exceed one hundred million dollars ($100,000,000) per year by imposing the surcharge pursuant to paragraph (1).
(h)The commission shall determine and specify those statewide organizations representing the deaf or hard of hearing that shall receive a telecommunications device pursuant to subdivision (a), or a dual-party relay system pursuant to subdivision (b), or both, and in which offices the equipment shall be installed in the case of an organization having more than one office.
(i)The commission may direct a telephone corporation subject to its jurisdiction to comply with its determinations and specifications pursuant to this section.
(j)The commission shall annually review the surcharge level and the balances in the funds established pursuant to subdivision (g). Until January 1, 2025, 2031, the commission may make, within the limits set by subdivision (g), necessary adjustments to the surcharge to ensure that the programs supported by the surcharge are adequately funded and that the fund balances are not excessive. A fund balance that is projected to exceed six months worth of projected expenses at the end of the fiscal year is excessive.
(k)In order to continue to meet the access needs of individuals with functional limitations of hearing, vision, movement, manipulation, speech, and interpretation of information, the commission shall perform an ongoing assessment of, and if appropriate, expand the scope of, the program to allow for additional access capability consistent with evolving telecommunications technology.
(l)The commission shall structure the programs required by this section so that a charge imposed to promote the goals of universal service reasonably equals the value of the benefits of universal service to contributing entities and their subscribers.
SEC. 6.Section 5440.5 of the Public Utilities Code is amended to read:5440.5.(a)As part of the regulation of transportation network companies (TNCs) referenced in subdivision (a) of Section 5440, the commission shall do all of the following:
(1)In a new or existing proceeding, establish a program relating to accessibility for persons with disabilities, including wheelchair users who need a wheelchair-accessible vehicle (WAV). This program shall include, but is not limited to, all of the following:
(A)By January 1, 2019, the commission shall begin conducting workshops with stakeholders, including California cities and counties, disability rights organizations, persons with disabilities, transportation and transit agencies, social service transportation providers, paratransit coordinating councils, and transportation network companies, in order to determine community WAV demand and WAV supply and to develop and provide recommendations regarding the establishment of geographic areas, criteria for Access Fund expenditures, and educational outreach objectives for programs for on-demand services and partnerships consistent with the requirements of this section. Workshops The workshops may also examine topics including, but not limited to, vehicle specifications, subsidies for wheelchair pickups, maintenance and fuel costs, designated pickup locations for drivers in locations where door-to-door service is not feasible, standards for trip requests, response times, and rider initiated cancellation, limiting of stranded users, integration of service into city and county transportation plans, or any necessary training or additional incentives for WAV drivers that results in a measurable impact on service availability, efficiency, and efficacy. The commission shall conduct a minimum of five workshops throughout the state.
(B)(i)The commission shall require each TNC TNC, by July 1, 2019, to pay on a quarterly basis to the commission an amount equivalent to, at minimum, 0.05 dollars ($0.05) for each TNC trip completed using the transportation network companys online-enabled application or platform that originates in one of the geographic areas selected pursuant to subparagraph (D), except if the TNC meets the requirements of an exemption established by the commission pursuant to subparagraph (G). The commission may adjust the fee in each geographic area selected pursuant to subparagraph (D) to different levels based on the cost of providing adequate WAV service within the geographic area.
(ii)Each TNC shall charge its customers on each TNC trip completed the full amount of the per-trip fee established pursuant to this subparagraph, and remit the total amount of those fees charged to the commission each quarter. The commission shall authorize a TNC to offset against the amounts due pursuant to this subparagraph for a particular quarter the amounts spent by the TNC during that quarter to improve WAV service on its online-enabled application or platform for each geographic area and thereby reduce the amount required to be remitted to the commission. In order to offset amounts due pursuant to this subparagraph in a geographic area, the commission shall require a TNC, at a minimum, to demonstrate, in the geographic area, the presence and availability of drivers with WAVs on its online-enabled application or platform, improved level of service, including reasonable response times, due to those investments for WAV service compared to the previous quarter, efforts undertaken to publicize and promote available WAV services to disability communities, and a full accounting of funds expended.
(C)The commission shall create the TNC Access for All Fund (Access Fund) and deposit moneys collected pursuant to subparagraph (B) in the Access Fund. The commission shall distribute funds in the Access Fund on a competitive basis to access providers that establish on-demand transportation programs or partnerships to meet the needs of persons with disabilities, including wheelchair users who need a WAV, in the geographic areas selected pursuant to subparagraph (D).
(D)The commission shall select geographic areas, which shall be based on the demand for WAVs within the area and selected according to outcomes of workshops in subparagraph (A), for inclusion in the on-demand transportation programs or partnerships funded pursuant to subparagraph (C). The commission shall allocate moneys in the Access Fund for use in each geographic area in a manner that is proportional to the percent of the Access Fund fees originating in that geographic area.
(E)The commission shall request access providers to submit applications to receive funds pursuant to subparagraph (C) by April 1, 2020. The commission may accept applications for new on-demand transportation programs or partnerships any time after April 1, 2020. From the applications that are submitted, the commission shall select by July 1, 2020, on-demand transportation programs or partnerships to receive funding based on criteria adopted by the commission in consultation with stakeholders described in subparagraph (A). As part of the criteria, the commission shall require an access provider to demonstrate in its application, at a minimum, how the program or partnership improves response times for WAV service compared to the previous year, the presence and availability of WAVs within the geographic area, and efforts undertaken to publicize and promote available WAV services to disability communities.
(F)The commission shall distribute funds pursuant to subparagraph (E) in the Access Fund within 90 days following the end of each year. If no access provider meets the requirements, funds shall remain in the Access Fund and be distributed the next year.
(G)The commission shall require each transportation network company to be accessible to persons with disabilities in order to be exempt from paying the charge required pursuant to subparagraph (B). The commission shall adopt a designated level of WAV service that is required to be met in each geographic area via a TNCs online-enabled application or platform in order for the TNC to be exempt from paying the fee required pursuant to subparagraph (B) for the next year in that geographic area. As part of the designated level of WAV service for each geographic area, the commission shall require a TNC, at a minimum, to have response times for 80 percent of WAV trips requested via the TNCs online-enabled application or platform within a time established by the commission for that geographic area. If a TNC meets the WAV service level requirement established pursuant to this subparagraph in a geographic area selected pursuant to subparagraph (D) for a particular year, the TNC is shall be exempt from paying the fee imposed pursuant to subparagraph (B) for the next year for that geographic area only. A TNC may provide a higher level of service than the minimum service level requirement designated by the commission.
(H)A TNC may meet the requirements of clause (ii) of subparagraph (B) and subparagraph (G) by facilitating WAV service through its online-enabled application or platform, by directly providing WAV service with vehicles that it owns, or by a contract to provide WAV service with a transportation provider, or by any combination of these methods.
(I)Within 30 days after the end of each quarter beginning after July 1, 2020, quarter, a transportation network company that receives an offset pursuant to clause (ii) of subparagraph (B) or an access provider that receives funding pursuant to subparagraph (C) shall submit a report to the commission. The report shall include, but shall not be limited to, all of the following:
(i)The number of WAV rides requested.
(ii)The number of WAV rides fulfilled.
(iii)Data detailing the response time between when a WAV ride was requested and when the vehicle arrived.
(iv)Information regarding educational outreach to disability communities, including, but not limited to, information and promotion of availability of WAVs for wheelchair users.
(v)A detailed description of expenditures or investments, as applicable.
(J)The commission shall establish yearly benchmarks for TNCs and access providers to meet to ensure WAV users receive continuously improved, reliable, and available service. These benchmarks shall include, but are not limited to, response times, percentage of trips fulfilled versus trips requested, and number of users requesting rides versus community WAV demand for each geographic area.
(K)The commission shall authorize no more than 2 percent of existing funds collected from TNCs pursuant to Section 421 and deposited into the Public Utilities Commission Transportation Reimbursement Account to be distributed to accessibility advocates who provide a substantial contribution to the proceeding initiated pursuant to this section, and only for the duration of the commission proceeding initiated pursuant to this section. These funds may shall only be distributed to advocates for accessible transportation or representatives of a group whose membership uses accessible transportation. The commission shall distribute funds pursuant to this subparagraph in a manner consistent with the requirements of Sections 1803 to 1808, inclusive. The commission shall not increase the fees authorized pursuant to Section 421 in order to fulfill the requirements of this subparagraph. Nothing in this subparagraph is intended to allow parties to obtain intervenor compensation for other transportation proceedings at the commission.
(2)(A)Report to the Legislature by January 1, 2024, on compliance with the this section and on the effectiveness of the on-demand transportation programs or partnerships funded pursuant to this section. The report shall include, but not be limited to, all of the following:
(i)A study on the demand for WAVs, including demand according to time of day and geographic area.
(ii)An analysis of the reports required to be submitted by access providers receiving funding pursuant to paragraph (1).
(iii)The availability of unallocated funds in the Access Fund, including the need to reassess Access Fund allocations.
(iv)An analysis of current program capabilities and deficiencies, and recommendations to overcome any identified deficiencies.
(B)The report required by this paragraph shall be submitted to the Legislature in compliance with Section 9795 of the Government Code.
(3)Create a working group with stakeholders described in subparagraph (A) of paragraph (1) to examine the variety of agencies, localities, and programs that provide transportation services for persons with disabilities, including passenger stage carriers and charter-party carriers within the commissions jurisdiction, in order to evaluate ways to partner with those agencies to provide services to disabled persons in a nonduplicative, nondiscriminatory, and more efficient manner.
(b)Notwithstanding Section 13340 of the Government Code, moneys deposited in the TNC Access for All Fund created pursuant to subparagraph (C) of paragraph (1) of subdivision (a) are continuously appropriated to the commission without regard to fiscal years for purposes of the program established pursuant to this section.
(c)The commission may hire an independent entity to administer the program established pursuant to subdivision (a) and to complete the report required pursuant to paragraph (2) of subdivision (a).
(d)Nothing in this section shall This section does not limit the rights of any person to pursue any remedies or causes of action that they may have under any state or federal law to enforce compliance with those laws or the obligations stated in this section. Nothing in this section shall be construed to This section does not expand or limit any obligations, if any, of a transportation network company under existing state or federal disability access laws.
(e)This section shall remain in effect only until January 1, 2026, 2032, and as of that date is repealed.
SEC. 7.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Oct 1, 2025 | Chaptered by Secretary of State - Chapter 205, Statutes of 2025. |
| Oct 1, 2025 | Approved by the Governor. |
| Sep 22, 2025 | Enrolled and presented to the Governor at 3 p.m. |
| Sep 10, 2025 | Urgency clause adopted. Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 67. Noes 1. Page 3186.). |
| Sep 8, 2025 | In Assembly. Concurrence in Senate amendments pending. |
| Sep 8, 2025 | Read third time. Urgency clause adopted. Passed. Ordered to the Assembly. (Ayes 39. Noes 0. Page 2619.). |
| Sep 2, 2025 | Read second time. Ordered to third reading. |
| Aug 29, 2025 | Read second time and amended. Ordered returned to second reading. |
| Aug 29, 2025 | From committee: Amend, and do pass as amended. (Ayes 7. Noes 0.) (August 29). |
| Aug 25, 2025 | In committee: Referred to suspense file. |
| Aug 13, 2025 | In committee: Hearing postponed by committee. |
| Jul 9, 2025 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 15. Noes 0.) (July 8). Re-referred to Com. on APPR. |
| Jul 3, 2025 | Read second time and amended. Re-referred to Com. on TRANS. |
| Jul 2, 2025 | From committee: Amend, and do pass as amended and re-refer to Com. on TRANS. (Ayes 15. Noes 0.) (July 1). |
| Jun 5, 2025 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on E., U & C. |
| May 28, 2025 | Referred to Coms. on E., U & C. and TRANS. |
| May 20, 2025 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 19, 2025 | Read third time. Passed. Ordered to the Senate. (Ayes 65. Noes 1. Page 1610.) |
| May 15, 2025 | Read second time. Ordered to third reading. |
| May 14, 2025 | From committee: Do pass. (Ayes 11. Noes 0.) (May 14). |
| May 6, 2025 | Re-referred to Com. on APPR. |
| May 5, 2025 | Read second time and amended. |
| May 1, 2025 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 17. Noes 0.) (April 30). |
| Apr 30, 2025 | From committee: Do pass and re-refer to Com. on U. & E. (Ayes 6. Noes 0.) (April 30). Re-referred to Com. on U. & E. |
| Apr 24, 2025 | (Pending re-refer to Com. on U. & E.) |
| Apr 24, 2025 | Assembly Rule 56 suspended. (Page 1265.) |
| Apr 7, 2025 | Referred to Coms. on C. & C. and U. & E. |
| Mar 29, 2025 | From printer. May be heard in committee April 28. |
| Mar 28, 2025 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 10, 2025 | AB 1532 Communications and Conve Concurrence - Urgency Added By BOERNER | Assembly Floor |
Passed |
|
| Sep 8, 2025 | Assembly 3rd Reading AB1532 C. & C. (Boerner) By McNerney Urgency Clause | Senate Floor |
Passed |
|
| Aug 29, 2025 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| Aug 25, 2025 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jul 8, 2025 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Transportation |
Passed |
|
| Jul 1, 2025 | Do pass as amended, but first amend, and re-refer to the Committee on [Transportation] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
|
| May 19, 2025 | AB 1532 C. & C. Assembly Third Reading By BOERNER | Assembly Floor |
Passed |
|
| May 14, 2025 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 30, 2025 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Energy |
Passed |
|
| Apr 30, 2025 | Do pass and be re-referred to the Committee on [Utilities and Energy] | Assembly Standing Committee on Communications and Conveyance |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| California Association Of Area Agencies On Aging | ** Support | |
| City and County of San Francisco | ** Support | |
| Marin Center for Independent Living | ** Support | |
| San Francisco County Transportation Authority | ** Support |
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 1532
Author:(Committee on Communications and Conveyance)
As Amended Ver:August 29, 2025
2/3 vote. Urgency
SUMMARY
This bill extends the requirement for the California Public Utilities Commission (CPUC) to establish and fund the transportation network company (TNC) Access for All (AFA) program until January 1, 2032. The bill also requires the CPUC to collect more granular information about CPUC Commissioner attendance at CPUC hearings. >
Senate Amendments
- Strike the extension of the Deaf and Disabled Telecommunications Program, which was extended in a budget trailer bill.
- Strike the requirement that CPUC adopt rules governing Commissioner attendance at CPUC hearings.
- Strike the requirement that a CPUC Commissioner appear at a legislative hearing at the request of the Chair of a Senate or Assembly Committee with jurisdiction over budget or policy matters concerning the CPUC.
COMMENTS
- Access for All Program. The Access for All Program ("AFA") was developed to implement SB 1376 (Hill), Chapter 701, Statutes of 2018, which directed the CPUC to establish a program to increase the availability of on-demand transportation for persons with disabilities, including wheelchair users who need a wheelchair-accessible vehicle (WAV) on transportation network company (TNC) platforms. The program began implementation in the third quarter of 2019 and is designed to encourage growth in the availability of on-demand transportation that meets the mobility needs of persons with disabilities, including wheelchair users who need a WAV. This is achieved by collecting a per-trip fee on all transportation network company (TNC) trips that originate in California, which is then re-invested in WAV service. The requirement to establishment this program, including the authorization to collect the $0.05 per completed TNC trip charge to fund the program, will expire as of January 1, 2026. An extension is necessary to continue this program.
- Oversight and Accountability for the CPUC. This bill amends current reporting requirement by requiring the CPUC to collect more granular information about CPUC Commissioner attendance at CPUC hearings. The granular information would require additional information about attendance based on industry type, hearing type, and proceeding type. This proposal comes as a direct response to recent reports to the Legislature from the CPUC which appear to show that CPUC commissioners often miss hearings of their own agency and never preside over their own hearings. For example, in a 2024 "CPUC Report on Commissioner Presence During 2025 Hearings", the CPUC reported that commissioners were present at hearings less than 25% of the time and never presided at any hearing the entire year. While many of those hearings are procedural hearings, the existing reporting requirement does not require the granular level of reporting this bill would provide. With this more granular information the intent is that the public and Legislature will have more awareness about how CPUC Commissioners spend their time across the multitude of industries and proceedings under their purview.
When this bill left the Assembly it included stronger requirements that would have required CPUC Commissioner attendance at legislative hearings and a requirement that the CPUC adopt rules about Commissioner attendance at CPUC hearings. Those provisions were removed in Senate policy and fiscal committee amendments, however the provision that remains will still provide greater insight into the topic of CPUC Commissioner attendance.
According to the Author
"The content of this bill covers a scope of issues directly pertaining to the jurisdiction and experience of the the Communications & Conveyance committee. Specifically, it extends the state's ability to fund a programs administered by the CPUC that provide critical assistance to disabled Californians. The bill also includes new accountability measures for the CPUC based on this committee's experience in engaging in oversight of the CPUC's programs during a committee oversight hearing, wherein the committee discovered concerning trends about CPUC commissioner attendance at hearings."
Arguments in Support
"The TNC Access for All Program has strong support across cities and disability advocates. Improved on-demand transportation access allows greater workforce participation and increased economic activity from the disability community. If the fund is not extended past the current January 1, 2026 sunset date, TNCs in California may not provide WAV service, putting greater strain on local transit agencies and risking the equal mobility access the disability community deserves."
Arguments in Opposition
None on file.
FISCAL COMMENTS
According to the Assembly Appropriations Committee, impacts to the AFA program would have absorbable state costs. Additionally, the Senate Appropriations Committee did not provide any cost estimate of the reporting requirements, but they would likely be absorbed into the existing requirement.
VOTES:
ASM COMMUNICATIONS AND CONVEYANCE: 8-0-2
YES: Boerner, Ahrens, Bonta, Caloza, Garcia, Lowenthal, Rogers, Blanca Rubio
ABS, ABST OR NV: Hoover, Castillo
ASM UTILITIES AND ENERGY: 17-0-1
YES: Petrie-Norris, Patterson, Boerner, Calderon, Chen, Davies, Fong, Mark González, Harabedian, Hart, Irwin, Papan, Rogers, Schiavo, Solache, Wallis, Zbur
ABS, ABST OR NV: Ta
ASM APPROPRIATIONS: 11-0-4
YES: Wicks, Arambula, Calderon, Caloza, Elhawary, Fong, Mark González, Hart, Pacheco, Pellerin, Solache
ABS, ABST OR NV: Sanchez, Dixon, Ta, Tangipa
ASSEMBLY FLOOR: 65-1-13
YES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Chen, Connolly, Davies, Elhawary, Fong, Gabriel, Gallagher, Garcia, Gipson, Mark González, Haney, Harabedian, Hart, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NO: DeMaio
ABS, ABST OR NV: Castillo, Dixon, Ellis, Flora, Jeff Gonzalez, Hadwick, Hoover, Lackey, Macedo, Papan, Sanchez, Ta, Tangipa
UPDATED
VERSION: August 29, 2025
CONSULTANT: Emilio Perez / C. & C. / (916) 319-2637 FN: 0001888
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 1532 |
THIRD READING
Bill No: AB 1532
Author: Committee on Communications and Conveyance
Amended: 8/29/25 in Senate
Vote: 27 - Urgency
SENATE ENERGY, U. & C. COMMITTEE: 15-0, 7/1/25
AYES: Becker, Ochoa Bogh, Allen, Archuleta, Arreguín, Ashby, Caballero, Dahle, Gonzalez, Hurtado, Limón, McNerney, Rubio, Stern, Wahab
NO VOTE RECORDED: Grove, Strickland
SENATE TRANSPORTATION COMMITTEE: 15-0, 7/8/25
AYES: Cortese, Strickland, Archuleta, Arreguín, Blakespear, Cervantes, Dahle, Gonzalez, Grayson, Limón, Menjivar, Richardson, Seyarto, Umberg, Valladares
SENATE APPROPRIATIONS COMMITTEE: 7-0, 8/29/25
AYES: Caballero, Seyarto, Cabaldon, Dahle, Grayson, Richardson, Wahab
ASSEMBLY FLOOR: 65-1, 5/19/25 - See last page for vote
SUBJECT: Public Utilities Commission
SOURCE: Author
DIGEST:
This bill extends the Access for All (AFA) program at the California Public Utilities Commission (CPUC) to fund on-demand transportation options at the local level for individuals with disabilities. This bill also requires the CPUC to modify an existing annual report on commissioner attendance at CPUC hearings.
ANALYSIS:
Existing law:
- Establishes the CPUC to fix rates, establish rules, examine records, issue subpoenas, administer oaths, take testimony, punish for contempt, and prescribe a uniform system of accounts for all public utilities subject to its jurisdiction. Under existing law, the CPUC consists of five members appointed by the Governor and confirmed by the Senate. The Legislature may remove a CPUC commissioner for incompetence, neglect of duty, or corruption with a 2/3 vote in each house. Existing law authorizes the CPUC to establish its own procedures, subject to statute and due process. Any commissioner as designated by the CPUC may hold a hearing or investigation or issue an order subject to CPUC approval. (Article 12 of the California Constitution)
- Establishes requirements for CPUC hearings. Under existing law all hearings, investigations, and proceedings must comply with rules of practice and procedure adopted by the CPUC. Existing law requires the CPUC to determine whether a proceeding is a quasi-legislative, adjudication, ratesetting, or catastrophic wildfire proceeding. Existing law specifies requirements for each type of proceeding. Existing law generally requires an Administrative Law Judge (ALJ) to preside over, or assist a commissioner in presiding over, any evidentiary or adjudication hearing. (Public Utilities Code §§1701,1701.1)
- Existing law requires the CPUC to establish a procedure for any party to request the presence of a CPUC commissioner at a ratesetting hearing, and existing law requires the assigned commissioner to be present at any closing arguments in a rate case. Existing law requires the principal hearing officer to present a proposed decision in a ratesetting case to the full commission in a public meeting. This presentation must contain a record of the number of days of the hearing, the number of days that each commissioner was present, and whether the CPUC completed the decision in time. (Public Utilities Code §1701.3)
- Requires the CPUC president to assign a CPUC commissioner to act as the presiding officer in a catastrophic wildfire proceeding following the submission of an application by an electrical corporation regarding covered wildfire costs. (Public Utilities Code §1701.8)
- Requires the CPUC to prepare an annual report on its activities and performance and requires the president of the CPUC to appear annually before the appropriate policy committees of the Legislature to present the report. (Public Utilities Code §§910 and 321.6)
- Establishes the Deaf and Disabled Telephone Program (DDTP), which provides devices and services, including the California Relay Service, for individuals with hearing disabilities. Existing law authorized the CPUC to collect a surcharge on in-state telecommunications access lines to fund the DDTP until January 1, 2025. (Public Utilities Code §2881)
- Establishes the AFA program by directing the CPUC to set a per-trip fee on transportation network company (TNC) rides to fund on-demand accessible transportation programs or partnerships to meet the needs of persons with disabilities in geographic areas of the state designated by the CPUC. Under existing law, the AFA program sunsets on January 1, 2026. (Public Utilities Code §5440.5)
This bill:
- Extends the TNC AFA program from January 1, 2026, to January 1, 2032.
- Requires the CPUC modify its annual report regarding commissioner attendance at CPUC hearings to include specified information about the types of hearings, types of proceedings, and subject matter of hearings attended by commissioners.
Background
Bill extends the AFA program, which helps fund on-demand accessible transportation to individuals with disabilities. Prior legislation SB 1376, (Hill, Chapter 701, Statutes of 2018) required the CPUC to establish the TNC AFA Fund to provide competitive grants to transportation access providers for the purposes of supporting on-demand transportation options for individuals with disabilities, including Californians who require a wheelchair accessible vehicle (WAV) for transportation. Under existing law, this fund is supported by a surcharge of at least $0.05 on each TNC ride. TNCs must submit revenues from this surcharge to the TNC AFA Fund on a quarterly basis. Grants provide by the AFA program are intended to address the extent to which many vehicles operated by TNC drivers are not accessible for individuals with certain disabilities, which limits the extent to which on-demand transportation options are available for these Californians. Frequently, WAV on-demand services are unavailable in many communities and are operated by a limited number of transportation providers that specialize in services for individuals for disabilities. Even in areas where on-demand WAV services exist, the cost for these services is substantial – far exceeding other on-demand transportation options like TNC rides and taxis. Grants from the AFA program fund WAV rides through two mechanisms: funding to TNCs to help offset the costs for making rides with WAV drivers more accessible and local access fund administrators (LAFAs) that provide subsidized accessible transportation services through programs at the local level. TNCs must meet certain benchmarks to obtain incentives through the AFA program.
Data submitted to the CPUC by participating TNCs indicates that costs for on-demand WAV rides through TNCs remain higher, with longer wait times than rides that do not require WAVs; however, data also indicates that costs for WAV rides in TNCs has declined over the course of the program while the volume of riders requesting rides has increased. While the CPUC’s reports on the data reported by TNCs indicates that more work is needed to make services more timely and less costly, the data also shows that the program is substantially expanding access to on-demand WAV rides. For grants provided to local transportation programs, the CPUC’s data also shows that the volume of Californians with disabilities accessing WAVs through the program is increasing. The CPUC’s February 2025 report on the program’s benchmarks for 2023 an 2024 states: “Newly available data from LAFAs this year shows demand for WAVs in the thousands of ride requests each quarter, averaging 9,097 ride requests per quarter from Q3 2023 to Q2 2024.” The CPUC continues to provide funding cycles for counties’ LAFAs to obtain grants. The CPUC’s February 2025 report notes:
To date, CPUC has awarded a total of $35.7M Access Funds to Local Access Fund Administrators. Of the $35.7M, $12.4M was awarded in Cycle 4 for funding year 2024-2025. On April 1, 2024, the CPUC received 12 LAFA applications for Cycle 4, including four MPOs, two RTPAs, four CTCs, and two Public Transit Agencies.
Existing law sunsets the AFA program on January 1, 2026. This bill would extend the program’s operation until January 1, 2032. This extension would allow the CPUC to continue to fund programs that scale up and lower the cost of on-demand WAV transportation.
Bill addresses ambiguity in CPUC reports about commissioners’ attendance at CPUC hearings. This bill requires the CPUC to update an existing annual report to obtain more information about the types and nature of hearings that commissioners attend. According to the author’s office, changes to this report are needed to address concerns about commissioners’ lack of attendance at CPUC hearings. The author’s office cites an annual report regarding the status of CPUC proceedings, which also provides information about commissioner attendance at all the hearings conducted for these proceedings. Below is a table summarizing data from the most recent annual report on the status of CPUC proceedings showing the number hearing days attended by a CPUC commissioner or presided over by a CPUC commissioner.
Total | Attended by a Commissioner | Commissioner Presiding | |
Number of Hearing Days | 273 | 65 | 0 |
Percentage of Hearing Days | 100% | 23.8% | 0% |
While this report may indicate that CPUC commissioners rarely preside over hearing days and attend a small portion of hearings administered by the CPUC, the overwhelming majority of CPUC hearings tend to be prehearing conferences, oral arguments, and other evidentiary hearings that are intended to build the record of the proceeding. With notable exemptions, existing law generally requires ALJs to preside over these types of hearings. Existing law also establishes specific requirements for commissioners to preside over certain hearings, including a requirement for a designated commissioner to preside over covered wildfire proceedings. While the CPUC’s report does not provide greater detail about the hearings attended by commissioners, it is likely that many of these hearing days are en banc or public participation hearings, which are more public-facing events intended to ensure that the CPUC engages directly with members of the public who are not intervenors regularly appearing before the CPUC. This bill would provide more detailed information on a regular basis to assess the extent to which CPUC commissioners are attending hearings in a manner that ensures that certain types of hearings and subject matters are not neglected.
Prior/Related Legislation
SB 544 (Laird) of 2025, allows the CPUC to establish an expedited review and approval process for railroad crossing applications that are uncontested and do not need additional review or evidentiary hearings. The bill is currently pending on the Senate Floor.
AB 497 (Santiago, Chapter 287, Statutes of 2019) extended the operation of the DDTP until January 1, 2025.
AB 1514 (Patterson, Chapter 291, Statutes of 2019) authorized nurse practitioners to certify an individual as having a qualifying disability for the purpose of DDTP eligibility.
SB 1376 (Hill, Chapter 701, Statutes of 2018) established the AFA program by directing the CPUC to set a per-trip fee on TNC rides to fund on-demand accessible transportation programs or partnerships to meet the needs of persons with disabilities in geographic areas of the state designated by the CPUC. Under existing law, the AFA program sunsets on January 1, 2026.
FISCAL EFFECT: Appropriation: Yes Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee, this bill will result in ongoing costs, likely in the hundreds of thousands of dollars annually, from January 1, 2026 to January 1, 2032 (ratepayer funds) for the CPUC to continue administering the AFA program—the transportation network company (TNC) wheelchair-accessible vehicle (WAV) program—during a period in which it would otherwise have sunset absent this bill.
SUPPORT: (Verified 8/29/25)
California Association of Area Agencies on Aging
City and County of San Francisco
Marin Center for Independent Living
San Francisco County Transportation Authority
OPPOSITION: (Verified 8/29/25)
None received
ARGUMENTS IN SUPPORT: According to the author:
The content of this bill covers a scope of issues directly pertaining to the jurisdiction and experience of the Communications & Conveyance committee. Specifically, it extends the state’s ability to fund two programs administered by the CPUC that provide critical assistance to disabled Californians. The bill also includes new accountability measures for the CPUC based on this committee’s experience in engaging in oversight of the CPUC’s programs during a committee oversight hearing, wherein the committee discovered concerning trends about CPUC Commissioner attendance at hearings.
ASSEMBLY FLOOR: 65-1, 5/19/25
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Chen, Connolly, Davies, Elhawary, Fong, Gabriel, Gallagher, Garcia, Gipson, Mark González, Haney, Harabedian, Hart, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NOES: DeMaio
NO VOTE RECORDED: Castillo, Dixon, Ellis, Flora, Jeff Gonzalez, Hadwick, Hoover, Lackey, Macedo, Papan, Sanchez, Ta, Tangipa
Prepared by: Sarah Smith / E., U. & C. / (916) 651-4107
9/2/25 18:22:40
**** END ****
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
AB 1532 (Committee on Communications and Conveyance) - Public Utilities Commission
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would extend the “Access for All” (AFA) program by seven years, from 2026 to 2032, and would require a California Public Utilities Commission (CPUC) commissioner to appear at a legislative hearing at the request of the Chair of a committee with jurisdiction over budget and policy issues relevant to the CPUC.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on August 29, 2025
Fiscal Impact:
- Ongoing costs, likely in the hundreds of thousands of dollars annually, from January 1, 2026 to January 1, 2032 (ratepayer funds) for the CPUC to continue administering the AFA program—the transportation network company (TNC) wheelchair-accessible vehicle (WAV) program—during a period in which it would otherwise have sunset absent this bill. The initial bill establishing the AFA program, SB 1376 (Hill, Ch. 701, Stat. of 2018) resulted in a subsequent budget change proposal (BCP) requesting ongoing funding of $400,000 annually to implement its provisions. The Senate Appropriations Committee analysis of SB 1376 included the following fiscal impact: “The CPUC indicates this bill would result in annual costs of approximately $337,000 (special fund) for two new positions to support transportation proceedings and rule development, to develop an enforcement program, and to conduct necessary litigation.”
Committee Amendments:
These amendments would strike the new CPUC commissioner appearance requirements. Specifically, they would no longer require a commissioner to appear at a legislative hearing at the request of the chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the commission.
Existing law requires the President of the CPUC to annually appear before the relevant policy committees in the Legislature to present information included in the CPUC’s annual report. As a result, the President of the CPUC annually testifies before the Assembly Utilities and Energy Committee and the Senate Energy, Utilities and Communications Committee. In addition to attending the annual CPUC oversight hearings required by statute, the CPUC president has consistently testified at other oversight hearings.
-- END --
SENATE COMMITTEE ON APPROPRIATIONS
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
AB 1532 (Committee on Communications and Conveyance) - Public Utilities Commission
Version: July 3, 2025 | Policy Vote: E.,U. &C. 15-0, TRANS. 15-0 |
Urgency: Yes | Mandate: Yes |
Hearing Date: August 25, 2025 | Consultant: Ashley Ames |
Bill Summary:
This bill would extend the “Access for All” (AFA) program by seven years, from 2026 to 2032, and would require a California Public Utilities Commission (CPUC) commissioner to appear at a legislative hearing at the request of the Chair of a committee with jurisdiction over budget and policy issues relevant to the CPUC.
Fiscal Impact:
- Ongoing costs, likely in the hundreds of thousands of dollars annually, from January 1, 2026 to January 1, 2032 (ratepayer funds) for the CPUC to continue administering the AFA program—the transportation network company (TNC) wheelchair-accessible vehicle (WAV) program—during a period in which it would otherwise have sunset absent this bill. The initial bill establishing the AFA program, SB 1376 (Hill, Ch. 701, Stat. of 2018) resulted in a subsequent budget change proposal (BCP) requesting ongoing funding of $400,000 annually to implement its provisions. The Senate Appropriations Committee analysis of SB 1376 included the following fiscal impact: “The CPUC indicates this bill would result in annual costs of approximately $337,000 (special fund) for two new positions to support transportation proceedings and rule development, to develop an enforcement program, and to conduct necessary litigation.”
Background:
Bill would extend the AFA program, which helps fund on-demand accessible transportation to individuals with disabilities. Prior legislation (SB 1376, Hill, Chapter 701, Statutes of 2018) required the CPUC to establish the TNC AFA Fund to provide competitive grants to transportation access providers for the purposes of supporting on-demand transportation options for individuals with disabilities, including Californians who require a wheelchair accessible vehicle (WAV) for transportation. Under existing law, this fund is supported by a surcharge of at least $0.05 on each TNC ride. TNCs must submit revenues from this surcharge to the TNC AFA Fund on a quarterly basis. Grants provide by the AFA program are intended to address the extent to which many vehicles operated by TNC drivers are not accessible for individuals with certain disabilities, which limits the extent to which on-demand transportation options are available for these Californians. Frequently, WAV on-demand services are unavailable in many communities and are operated by a limited number of transportation providers that specialize in services for individuals for disabilities. Even in areas where on-demand WAV services exist, the cost for these services is substantial – far exceeding other on-demand transportation options like TNC rides and taxis. Grants from the AFA program fund WAV rides through two mechanisms: funding to TNCs to help offset the costs for making rides with WAV drivers more accessible and local access fund administrators (LAFAs) that provide subsidized accessible transportation services through programs at the local level. TNCs must meet certain benchmarks to obtain incentives through the AFA program.
Data submitted to the CPUC by participating TNCs indicates that costs for on-demand WAV rides through TNCs remain higher, with longer wait times than rides that do not require WAVs; however, data also indicates that costs for WAV rides in TNCs has declined over the course of the program while the volume of riders requesting rides has increased. While the CPUC’s reports on the data reported by TNCs indicates that more work is needed to make services more timely and less costly, the data also shows that the program is substantially expanding access to on-demand WAV rides. For grants provided to local transportation programs, the CPUC’s data also shows that the volume of Californians with disabilities accessing WAVs through the program is increasing. The CPUC’s February 2025 report on the program’s benchmarks for 2023 an 2024 states: “Newly available data from LAFAs this year shows demand for WAVs in the thousands of ride requests each quarter, averaging 9,097 ride requests per quarter from Q3 2023 to Q2 2024.” The CPUC continues to provide funding cycles for counties’ LAFAs to obtain grants. The CPUC’s February 2025 report notes:
To date, CPUC has awarded a total of $35.7M Access Funds to Local Access Fund Administrators. Of the $35.7M, $12.4M was awarded in Cycle 4 for funding year 2024-2025. On April 1, 2024, the CPUC received 12 LAFA applications for Cycle 4, including four MPOs, two RTPAs, four CTCs, and two Public Transit Agencies.
Existing law sunsets the AFA program on January 1, 2026. This bill would extend the program’s operation until January 1, 2032. This bill extension would allow the CPUC to continue to fund programs that scale up and lower the cost of on-demand WAV transportation.
Bill aims to address issues in the Assembly regarding commissioners’ availability for Legislative oversight hearings. This bill requires a CPUC commissioner to appear before a legislative committee with relevant jurisdiction at the request of that committee’s chair. According to the author’s office, this requirement is intended to address concerns about specific commissioners’ availability to appear at legislative oversight hearings. The author’s office has indicated that on two occasions, legislative committees in the Assembly have experienced difficulty obtaining the attendance of a CPUC commissioner at oversight hearings. On February 12, 2025, the Assembly Communications and Conveyance Committee held an oversight hearing attended by CPUC Commissioner John Reynolds. At the hearing, several members of the Assembly commented on challenges the committee faced in securing the attendance of a commissioner. Information provided by the author’s office to the Senate Energy, Utilities and Communications Committee shows that the following events led to this discussion during the oversight hearing:
- February 3, 2025: The Assembly Communications and Conveyance Committee sent an email to the CPUC requesting the attendance of a specific CPUC commissioner at the committee’s February 12th oversight hearing.
- February 3, 2025: The CPUC indicates that they are unable to send the specific commissioner requested and instead say that staff best positioned to answer program questions will attend the hearing.
- February 5, 2025: Assembly Communications and Conveyance Committee request the CPUC to reconsider sending a commissioner to attend the hearing.
- February 5, 2025: The CPUC responds, informing the committee that the CPUC is not reconsidering the attendance of a commissioner.
- February 10, 2025: Seven of the Assembly Members sitting on the Assembly Communications and Conveyance Committee signed a letter sent to the CPUC imploring the CPUC to send a commissioner to attend the oversight hearing.
- February 12, 2025: Commissioner John Reynolds attends the oversight hearing and CPUC President Alice Reynolds sends a signed letter to the Assembly Communications and Conveyance Committee apologizing for the miscommunication regarding scheduling conflicts and the attendance of a commissioner at the hearing. President Reynolds expresses a commitment to better coordinating communication to ensure commissioner attendance at hearings.
Proposed Law:
This bill would extend the Access for All program, and would require a CPUC commissioner to appear at a legislative hearing at the request of the Chair of a committee with jurisdiction over budget and policy issues relevant to the CPUC.
Related Legislation:
SB 1376 (Hill, Chapter 701, Statutes of 2018) established the AFA program by directing the CPUC to set a per-trip fee on TNC rides to fund on-demand accessible transportation programs or partnerships to meet the needs of persons with disabilities in geographic areas of the state designated by the CPUC. Under existing law, the AFA program sunsets on January 1, 2026.
-- END --
SENATE COMMITTEE ON TRANSPORTATION
Senator Dave Cortese, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 7/8/2025
Author: | Committee on Communications and Conveyance | ||
Version: | 7/3/2025 Amended | ||
Urgency: | Yes | Fiscal: | Yes |
Consultant: | Manny Leon | ||
SUBJECT:
DIGEST: Of relevance to this committee, this bill would extend the Public Utilities Commission’s (PUC) authority for the transportation network company (TNC) wheelchair-accessible vehicle (WAV) program, known as the “Access for All” (AFA) program.
ANALYSIS:
Existing law:
- Requires the CPUC, until January 1, 2026, to establish the TNC-WAV program known as the “Access for All” program. Among other program requirements, AFA requires each TNC to pay to PUC an amount equivalent to, at a minimum, $0.05 for each TNC trip completed using the TNC’s online-enabled application or platform to fund the program.
This bill:
- Extends the requirement for the CPUC to establish the AFA program until January 1, 2032, including extending the $0.05 charge for each completed TNC trip.
COMMENTS:
This is the Assembly Communications and Conveyance Committee policy omnibus bill and makes various changes to existing law. See the Senate Energy, Utilities, and Communications Committee analysis for details on other provisions of this bill not within this committee’s jurisdiction.
- Purpose of the bill. According to the author, "The content of this bill covers a scope of issues directly pertaining to the jurisdiction and experience of this [the Communications & Conveyance] committee. Specifically, it extends the state’s ability to fund two programs administered by the CPUC that provide critical assistance to disabled Californians. The bill also includes new accountability measures for the CPUC based on this committee’s experience in engaging in oversight of the CPUC’s programs during a committee oversight hearing, wherein the committee discovered concerning trends about CPUC Commissioner attendance at hearings.”
- AFA. The Access for All Program (AFA) was developed to implement SB 1376 (Hill, Chapter 701, Statutes of 2018). The program began implementation in the third quarter of 2019, and is designed to encourage growth in the availability of on-demand transportation that meets the mobility needs of persons with disabilities, including wheelchair users who need a WAV. This is achieved by collecting a per-trip fee on all TNC (i.e., Uber and Lyft) trips that originate in California, which is then re-invested in WAV service.
Pursuant to existing law, PUC recently assessed whether WAV service is within service benchmarks established by the PUC,[1] which covers various features of service, including presence of WAVs across hours of the day, decrease in WAV-related expenditures, promotion of WAV service through outreach and engagement, and occurrence of complaints from WAV customers. The findings show that TNCs have the ability to meet and exceed program goals in most key performance areas in some counties, but there is still room for improvement and more to be learned about statewide feasibility of offering on‑demand WAV service. The report did make recommendations to the Legislature to improve the program. Specifically, augmenting timelines for entities participating in the program to be disbursed funds on an annual basis, instead be biennial. PUC suggests that doing so may help resource constraints on the part of participants, but also could increase participation overall. Currently, the statutory authorization for this program expires on January 1, 2026. This bill proposes to extend this sunset to January 1, 2032.
- Double referral. This bill was approved by the Senate Energy, Utilities and Communications Committee by a 15-0 vote on July 1, 2025.
Related/previous Legislation:
SB 1376 (Hill, Chapter 701, Statutes of 2018) – Established the AFA program, including requiring the CPUC to assess a fee on TNC rides to fund AFA. Further included a sunset on the program of January 2026.
FISCAL EFFECT: Appropriation: Yes Fiscal Com.: Yes Local: Yes
POSITIONS: (Communicated to the committee before noon on Wednesday,
July 2, 2025.)
SUPPORT:
California Association of Area Agencies on Aging
City and County of San Francisco
Marin Center for Independent Living
San Francisco County Transportation Authority
OPPOSITION:
None received
-- END --
2024 TNC Access for All Program Annual Report. https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/consumer-protection-and-enforcement-division/documents/tlab/accessforall/cpuc_legislative-report_access-for-all_dec-2023.pdf ↑
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Josh Becker, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 7/1/2025
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill re-establishes the surcharge funding the Deaf and Disabled Telephone Program (DDTP), extends the Access for All (AFA) program, and requires the California Public Utilities Commission (CPUC) to establish rules regarding CPUC commissioners’ attendance at CPUC hearings. This bill also requires a CPUC commissioner to appear at a legislative hearing at the request of the Chair of a legislative committee with jurisdiction over budget and policy issues relevant to the CPUC.
ANALYSIS:
Existing law:
- Establishes the CPUC to fix rates, establish rules, examine records, issue subpoenas, administer oaths, take testimony, punish for contempt, and prescribe a uniform system of accounts for all public utilities subject to its jurisdiction. Under existing law, the CPUC consists of five members appointed by the Governor and confirmed by the Senate. The Legislature may remove a CPUC commissioner for incompetence, neglect of duty, or corruption with a 2/3 vote in each house. Existing law authorizes the CPUC to establish its own procedures, subject to statute and due process. Any commissioner as designated by the CPUC may hold a hearing or investigation or issue an order subject to CPUC approval. (Article 12 of the California Constitution)
- Establishes requirements for CPUC hearings. Under existing law all hearings, investigations, and proceedings must comply with rules of practice and procedure adopted by the CPUC. Existing law requires the CPUC to determine whether a proceeding is a quasi-legislative, adjudication, ratesetting, or catastrophic wildfire proceeding. Existing law specifies requirements for each type of proceeding. Existing law generally requires an Administrative Law Judge (ALJ) to preside over, or assist a commissioner in presiding over, any evidentiary or adjudication hearing. (Public Utilities Code §§1701,1701.1)
- Existing law requires the CPUC to establish a procedure for any party to request the presence of a CPUC commissioner at a ratesetting hearing, and existing law requires the assigned commissioner to be present at any closing arguments in a rate case. Existing law requires the principal hearing officer to present a proposed decision in a ratesetting case to the full commission in a public meeting. This presentation must contain a record of the number of days of the hearing, the number of days that each commissioner was present, and whether the CPUC completed the decision in time. (Public Utilities Code §1701.3)
- Requires the CPUC president to assign a CPUC commissioner to act as the presiding officer in a catastrophic wildfire proceeding following the submission of an application by an electrical corporation regarding covered wildfire costs. (Public Utilities Code §1701.8)
- Requires the CPUC to prepare an annual report on its activities and performance and requires the president of the CPUC to appear annually before the appropriate policy committees of the Legislature to present the report. (Public Utilities Code §§910 and 321.6)
- Establishes the DDTP, which provides devices and services, including the California Relay Service, for individuals with hearing disabilities. Existing law authorized the CPUC to collect a surcharge on in-state telecommunications access lines to fund the DDTP until January 1, 2025. (Public Utilities Code §2881)
- Establishes the AFA program by directing the CPUC to set a per-trip fee on transportation network company (TNC) rides to fund on-demand accessible transportation programs or partnerships to meet the needs of persons with disabilities in geographic areas of the state designated by the CPUC. Under existing law, the AFA program sunsets on January 1, 2026. (Public Utilities Code §5440.5)
This bill:
- Extends the DDTP surcharge from January 1, 2025, to January 1, 2031.
- Extends the TNC AFA program from January 1, 2026, to January 1, 2032.
- Requires the CPUC to adopt rules governing commissioner attendance at hearings.
- Requires a CPUC commissioner to appear at a legislative hearing at the request of the chair of a Senate or Assembly committee with jurisdiction over budget or policy matters related to the CPUC.
Background
Bill re-establishes the DDTP surcharge, extending funding for telecommunications support to Californians with certain disabilities. Existing law establishes the DDTP to provide telecommunications devices to individuals with hearing disabilities. The DDTP is overseen by the CPUC and funded through a surcharge on in-state telecommunications access lines. The DDTP includes several different programs: the California Relay Service (CRS), the Equipment Distribution Program, and Augmentative and Alternative Communication (AAC). The CRS enables individuals who have hearing and speech limitations to communicate with other telephone users through trained communications assistants that relay discussions. The Equipment Distribution Program provides specialized telecommunication devices and equipment that help individuals who have certain disabilities. The AAC program is a collaboration with the Department of Rehabilitation, which uses funding from the DDTP to provide speech generating devices to eligible Californians. The DDTP surcharge has been extended numerous times. However, legislation did not extend the surcharge last year. As a result, the DDTP surcharge effectively sunset on January 1, 2025. Despite the lapse in surcharge collection, the DDTP maintained a limited surplus in funding. The DDTP continues to operate in the absence of the surcharge extension by spending down this limited surplus. However, maintaining the operation of the DDTP through the next fiscal year will require new moneys. This bill’s extension of the DDTP surcharge would ensure the continued operation of the DDTP once the existing surplus is exhausted. The Governor has also proposed extending the DDTP’s funding as part of budget legislation. Should a budget trailer bill include a DDTP extension, this bill may need amendments to prevent chaptering issues.
Bill extends the AFA program, which helps fund on-demand accessible transportation to individuals with disabilities. Prior legislation (SB 1376, Hill, Chapter 701, Statutes of 2018) required the CPUC to establish the TNC AFA Fund to provide competitive grants to transportation access providers for the purposes of supporting on-demand transportation options for individuals with disabilities, including Californians who require a wheelchair accessible vehicle (WAV) for transportation. Under existing law, this fund is supported by a surcharge of at least $0.05 on each TNC ride. TNCs must submit revenues from this surcharge to the TNC AFA Fund on a quarterly basis. Grants provide by the AFA program are intended to address the extent to which many vehicles operated by TNC drivers are not accessible for individuals with certain disabilities, which limits the extent to which on-demand transportation options are available for these Californians. Frequently, WAV on-demand services are unavailable in many communities and are operated by a limited number of transportation providers that specialize in services for individuals for disabilities. Even in areas where on-demand WAV services exist, the cost for these services is substantial – far exceeding other on-demand transportation options like TNC rides and taxis. Grants from the AFA program fund WAV rides through two mechanisms: funding to TNCs to help offset the costs for making rides with WAV drivers more accessible and local access fund administrators (LAFAs) that provide subsidized accessible transportation services through programs at the local level. TNCs must meet certain benchmarks to obtain incentives through the AFA program.
Data submitted to the CPUC by participating TNCs indicates that costs for on-demand WAV rides through TNCs remain higher, with longer wait times than rides that do not require WAVs; however, data also indicates that costs for WAV rides in TNCs has declined over the course of the program while the volume of riders requesting rides has increased. While the CPUC’s reports on the data reported by TNCs indicates that more work is needed to make services more timely and less costly, the data also shows that the program is substantially expanding access to on-demand WAV rides. For grants provided to local transportation programs, the CPUC’s data also shows that the volume of Californians with disabilities accessing WAVs through the program is increasing. The CPUC’s February 2025 report on the program’s benchmarks for 2023 an 2024 states: “Newly available data from LAFAs this year shows demand for WAVs in the thousands of ride requests each quarter, averaging 9,097 ride requests per quarter from Q3 2023 to Q2 2024.” The CPUC continues to provide funding cycles for counties’ LAFAs to obtain grants. The CPUC’s February 2025 report notes:
To date, CPUC has awarded a total of $35.7M Access Funds to Local Access Fund Administrators. Of the $35.7M, $12.4M was awarded in Cycle 4 for funding year 2024-2025. On April 1, 2024, the CPUC received 12 LAFA applications for Cycle 4, including four MPOs, two RTPAs, four CTCs, and two Public Transit Agencies.
Existing law sunsets the AFA program on January 1, 2026. This bill would extend the program’s operation until January 1, 2032. This bill extension would allow the CPUC to continue to fund programs that scale up and lower the cost of on-demand WAV transportation.
Bill aims to address issues in the Assembly regarding commissioners’ availability for Legislative oversight hearings. This bill requires a CPUC commissioner to appear before a legislative committee with relevant jurisdiction at the request of that committee’s chair. According to the author’s office, this requirement is intended to address concerns about specific commissioners’ availability to appear at legislative oversight hearings. The author’s office has indicated that on two occasions, legislative committees in the Assembly have experienced difficulty obtaining the attendance of a CPUC commissioner at oversight hearings. On February 12, 2025, the Assembly Communications and Conveyance Committee held an oversight hearing attended by CPUC Commissioner John Reynolds. At the hearing, several members of the Assembly commented on challenges the committee faced in securing the attendance of a commissioner. Information provided by the author’s office to the Senate Energy, Utilities and Communications Committee shows that the following events led to this discussion during the oversight hearing:
- February 3, 2025: The Assembly Communications and Conveyance Committee sent an email to the CPUC requesting the attendance of a specific CPUC commissioner at the committee’s February 12th oversight hearing.
- February 3, 2025: The CPUC indicates that they are unable to send the specific commissioner requested and instead say that staff best positioned to answer program questions will attend the hearing.
- February 5, 2025: Assembly Communications and Conveyance Committee request the CPUC to reconsider sending a commissioner to attend the hearing.
- February 5, 2025: The CPUC responds, informing the committee that the CPUC is not reconsidering the attendance of a commissioner.
- February 10, 2025: Seven of the Assembly Members sitting on the Assembly Communications and Conveyance Committee signed a letter sent to the CPUC imploring the CPUC to send a commissioner to attend the oversight hearing.
- February 12, 2025: Commissioner John Reynolds attends the oversight hearing and CPUC President Alice Reynolds sends a signed letter to the Assembly Communications and Conveyance Committee apologizing for the miscommunication regarding scheduling conflicts and the attendance of a commissioner at the hearing. President Reynolds expresses a commitment to better coordinating communication to ensure commissioner attendance at hearings.
Are statutory changes needed to compel commissioners to attend legislative hearings? While it is clear that CPUC commissioner attendance was not effectively coordinated for the Assembly committee’s February 12th hearing, it is less clear that these issues are pervasive throughout the Legislature and that statutory changes are needed. With notable exceptions, existing law does not generally require the attendance of a specific commissioner at legislative hearings. Existing law requires the President of the CPUC to annually appear before the relevant policy committees in the Legislature to present information included in the CPUC’s annual report. As a result, the President of the CPUC annually testifies before the Assembly Utilities and Energy Committee and the Senate Energy, Utilities and Communications Committee. In addition to attending the annual CPUC oversight hearings required by statute, the CPUC president has consistently testified at other oversight hearings.
This bill requires a CPUC commissioner to attend a legislative hearing at the request of a chair of a policy or budget committee with relevant jurisdiction. This bill does not specify which committees have relevant jurisdiction over CPUC issues, and it does not clarify whether the CPUC may meet this obligation with the attendance of any CPUC commissioner if a specific commissioner is unavailable for the hearing date. Statute already addresses circumstances in which a committee requires the testimony of a specific individual who refuses to appear at a hearing. Existing law (Government Code §37104) establishes the Legislature’s subpoena power. This law specifies the Legislature’s power to compel individuals to attend hearings or produce records and testimony at hearings. Existing law states: “The legislative body may issue subpoenas requiring attendance of witnesses or production of books or other documents for evidence or testimony in any action or proceeding pending before it.” In 1999, the Assembly Rules Committee adopted a legislative subpoena policy. This policy was intended to set forth the requirements for seeking a legislative subpoena in those circumstances in which an individual refuses a request to appear before the committee. The Assembly’s policy requires a committee chair to obtain approval from the Assembly Rules Committee before issuing a subpoena, and it requires the committee to submit a subpoena request at least 14 days before the hearing date. Under the Assembly’s policy, the committee must seek a potential witness’s voluntary attendance in writing. The Assembly Rules Committee may only consider a committee’s request for a subpoena after a witness has refused to voluntarily attend. In addition to the Assembly’s policy on legislative subpoenas, existing Senate hearing guidelines and the Joint Legislative Rules establish procedures for committee hearings and subpoena requests. By establishing a requirement to compel the attendance of a specific CPUC commissioner outside existing Senate and Assembly hearing guidelines and subpoena policies, this bill may imply that certain legislative committees have greater authority than others to compel commissioner attendance.
Bill’s provisions regarding commissioner attendance at CPUC hearings may not be beneficial. In addition to requiring commissioners to appear at legislative hearings, this bill also requires the CPUC to adopt rules regarding commissioner attendance at CPUC hearings. According to the author’s office, this requirement is intended to address concerns that CPUC commissioners are not attending a sufficient amount of the total hearings held by the CPUC. The author’s office cites annual report regarding the status of CPUC proceedings, which also provides information about commissioner attendance at all the hearings conducted for these proceedings. Below is a table summarizing data from the most recent annual report on the status of CPUC proceedings showing the number hearing days attended by a CPUC commissioner or presided over by a CPUC commissioner.
Total | Attended by a Commissioner | Commissioner Presiding | |
Number of Hearing Days | 273 | 65 | 0 |
Percentage of Hearing Days | 100% | 23.8% | 0% |
While this report may indicate that CPUC commissioners rarely preside over hearing days and attend a small portion of hearings administered by the CPUC, the overwhelming majority of these hearings are prehearing conferences, oral arguments, and other evidentiary hearings that are intended to build the record of the proceeding. With notable exemptions, existing law generally requires ALJs to preside over these hearings. Exemptions in existing law include requiring a designated commissioner to preside over covered wildfire proceedings. While the CPUC’s report does not provide greater detail about the hearings attended by commissioners, it is likely that many of these hearing days are en banc or public participation hearings, which are more public-facing events intended to engage directly with members of the public who are not intervenors regularly appearing before the CPUC. Requiring the attendance of a commissioner at more hearings may slow down the hearing process in order to align hearing dates to commissioner schedules, which could unnecessarily delay CPUC decisions. Additionally, a commissioner attending specific hearing days may only obtain an understanding of the evidence presented on those days, which may not reflect the entire evidentiary record considered at voting meetings.
Need for Amendments. As currently written, this bill may require the CPUC to adopt rules regarding commissioner attendance at CPUC hearings that could unnecessarily slow CPUC proceedings and prevent all evidence in a proceeding’s record from receiving equal consideration. This bill also contains an extension of the DDTP that is already included in legislation for the 2025-26 Budget Act. As a result the author and committee may wish to amend this bill to delete Sections 1 and 3 of this bill.
This bill’s provisions regarding commissioners’ attendance at legislative hearings may create conflicts and inconsistencies for legislative policies and committee procedures. Additionally, existing law and legislative policies already set for a subpoena process to address circumstances in which any individual refuses to respond to a committee chair’s request to appear at a hearing. To ensure that the Assembly Communications and Conveyance Committee has oversight opportunities similar to those provided in existing law for this committee and the Assembly Utilities and Energy Committee, the author and committee may wish to amend this bill to do the following:
- Delete subdivision (b) in Section 2 of this bill and
- Clarify that in addition to annually appearing before the Senate and Assembly energy committees, the CPUC’s President must also annually appear before the Assembly Communications and Conveyance Committee to report on relevant activities included in its annual report to the Legislature.
Dual Referral. Should this bill be approved by this committee, it will be re-referred to the Senate Transportation Committee.
Prior/Related Legislation
SB 544 (Laird) of 2025, allows the CPUC to establish an expedited review and approval process for railroad crossing applications that are uncontested and do not need additional review or evidentiary hearings. The bill is currently pending in the Assembly.
AB 497 (Santiago, Chapter 287, Statutes of 2019) extended the operation of the DDTP until January 1, 2025.
AB 1514 (Patterson, Chapter 291, Statutes of 2019) authorized nurse practitioners to certify an individual as having a qualifying disability for the purpose of DDTP eligibility.
SB 1376 (Hill, Chapter 701, Statutes of 2018) established the AFA program by directing the CPUC to set a per-trip fee on TNC rides to fund on-demand accessible transportation programs or partnerships to meet the needs of persons with disabilities in geographic areas of the state designated by the CPUC. Under existing law, the AFA program sunsets on January 1, 2026.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
City and County of San Francisco
Marin Center for Independent Living
OPPOSITION:
None received
ARGUMENTS IN SUPPORT: According to the author:
The content of this bill covers a scope of issues directly pertaining to the jurisdiction and experience of the Communications & Conveyance committee. Specifically, it extends the state’s ability to fund two programs administered by the CPUC that provide critical assistance to disabled Californians. The bill also includes new accountability measures for the CPUC based on this committee’s experience in engaging in oversight of the CPUC’s programs during a committee oversight hearing, wherein the committee discovered concerning trends about CPUC Commissioner attendance at hearings.
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 1532
Author:(Committee on Communications and Conveyance)
As Amended Ver:May 5, 2025
2/3 Vote
SUMMARY
This bill is a Communications & Conveyance Committee omnibus bill which makes various independent changes to several sections of law under the committee's purview.
Major Provisions
- Extends the requirement on the California Public Utilities Commission (CPUC) to collect the surcharge to fund the Deaf and Disabled Telecommunications Program (DDTP), which expired on January 1, 2025, and extends the requirement until January 1, 2031.
- Extends the requirement for the CPUC to establish and fund the transportation network company (TNC) Access for All (AFA) program until January 1, 2032, including extending the $0.05 charge for each completed TNC trip.
- Requires the CPUC to adopt rules governing commission attendance at hearings.
- Requires a CPUC commissioner to appear at a legislative hearing at the request of the Chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the CPUC.
COMMENTS
- Deaf and Disabled Telecommunications Program. The Deaf and Disabled Telecommunications Program (DDTP), also known as California Connect, is a state-mandated program under the administration of California Public Utilities Commission (CPUC) that provides accessible telecommunications services for individuals with disabilities. The funding authorization for the program has expired as of January 1, 2025, which is why the program is proposed to be extended. While the CPUC currently has enough funding reserves to continue to sustain the program, without an extension the program would have to cease operations.
DDTP offers specialized equipment, relay services, and Augmentative and Alternative Communication (AAC) programs to support independent and functionally equivalent communication. The program helps people with disabilities stay connected with loved ones, complete daily tasks, and access emergency services. Relay Services and Augmentative and Alternative Communication (AAC) devices facilitate communication with life-saving services such as 911 and 988.
According to the CPUC[1], in 2023-2024 the program provided specialized equipment for 6,170 new customers with specific needs. The relay services, which relay conversations back and forth over the telephone for disabled individuals, was used for 297,805 calls. The program also provided 885 long-term device iPads and 1,262 short-term device iPads to participants that needed assistance with speech related disabilities.
- Access for All Program. The Access for All Program ("AFA") was developed to implement SB 1376 (Hill), Chapter 701, Statutes of 2018, which directed the CPUC to establish a program to increase the availability of on-demand transportation for persons with disabilities, including wheelchair users who need a wheelchair-accessible vehicle (WAV) on transportation network company (TNC) platforms. The program began implementation in the third quarter of 2019 and is designed to encourage growth in the availability of on-demand transportation that meets the mobility needs of persons with disabilities, including wheelchair users who need a WAV. This is achieved by collecting a per-trip fee on all transportation network company (TNC) trips that originate in California, which is then re-invested in WAV service. The requirement to establishment this program, including the authorization to collect the $0.05 per completed TNC trip charge to fund the program, will expire as of January 1, 2026. An extension is necessary to continue this program.
- Oversight and Accountability for the CPUC. This bill would impose new requirements on commissioners of the CPUC and the agency generally. These new requirements are intended to provide greater accountability for the organization and responsiveness by the CPUC to the Legislature. First, this bill proposes to expand existing law which already requires the President of the CPUC to an annually report to the appropriate policy committees of the Legislature. This bill expands that existing requirement by also requiring a commissioner to be present at any legislative hearing at the request of the Chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the commission. This year and in years past, the Communications and Conveyance (C&C) Committee and others have had a difficult experience gaining the cooperation of commissioners to attend legislative oversight and informational hearings. In some instances, there has been a plain refusal to participate, which is unacceptable and disregards the proper role of the Legislature to conduct oversight of state agencies.
Second, this bill would also require the CPUC to adopt rules governing CPUC commissioner attendance at the agency's own hearings. Based on data presented in mandated reports to the Legislature, it appears that CPUC commissioners often miss hearings of their own agency and never preside over their own hearings. For example, in a 2024 "CPUC Report on Commissioner Presence During 2025 Hearings", the CPUC reported that commissioners were present at hearings less than 25% of the time and never presided at any hearing. Given the significant power and responsibility that commissioners are entrusted with under the California Constitution and Public Utilities Code, it is reasonable that the CPUC would be asked to adopt basic rules regarding commissioner attendance at hearings, as is proposed by this bill.
According to the Author
According to the Chair, "The content of this bill covers a scope of issues directly pertaining to the jurisdiction and experience of the the Communications & Conveyance committee. Specifically, it extends the state's ability to fund two programs administered by the CPUC that provide critical assistance to disabled Californians. The bill also includes new accountability measures for the CPUC based on this committee's experience in engaging in oversight of the CPUC's programs during a committee oversight hearing, wherein the committee discovered concerning trends about CPUC commissioner attendance at hearings."
Arguments in Support
None on file.
Arguments in Opposition
None on file.
FISCAL COMMENTS
According to the Assembly Appropriations Committee, the DDTP and AFA program would have absorbable state costs. Additionally, the Appropriations Committee estimates that the CPUC could handle the new obligations on commissioners with existing resources.
VOTES
ASM COMMUNICATIONS AND CONVEYANCE: 8-0-2
YES: Boerner, Ahrens, Bonta, Caloza, Garcia, Lowenthal, Rogers, Blanca Rubio
ABS, ABST OR NV: Hoover, Castillo
ASM UTILITIES AND ENERGY: 17-0-1
YES: Petrie-Norris, Patterson, Boerner, Calderon, Chen, Davies, Fong, Mark González, Harabedian, Hart, Irwin, Papan, Rogers, Schiavo, Solache, Wallis, Zbur
ABS, ABST OR NV: Ta
ASM APPROPRIATIONS: 11-0-4
YES: Wicks, Arambula, Calderon, Caloza, Elhawary, Fong, Mark González, Hart, Pacheco, Pellerin, Solache
ABS, ABST OR NV: Sanchez, Dixon, Ta, Tangipa
UPDATED
VERSION: May 5, 2025
CONSULTANT: Emilio Perez / C. & C. / (916) 319-2637 FN: 0000429
2023-2024 California Connect Annual Report. https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/communications-division/documents/ddtp/ddtp-annual-reports/california-connect-annual-report--20232024--accesible-final-uploaded-onto-cpuc-website.pdf ↑
Date of Hearing: May 14, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 1532
Author:(Committee on Communications and Conveyance) – As Amended Ver:May 5, 2025
Policy Committee: | Communications and Conveyance | Vote: | 8 - 0 |
Utilities and Energy | 17 - 0 | ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill, the Communications and Conveyance Committee omnibus bill, makes several, independent changes to disparate sections of law under the purview of the committee.
Specifically, this bill:
- Requires a commissioner of the California Public Utilities Commission (CPUC) to appear at a legislative hearing, at the request of the chairperson of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the CPUC.
- Renews the requirement on the CPUC to collect the surcharge to fund the Deaf and Disabled Telecommunications Program (DDTP), which ended on January 1, 2025, and extends it until January 1, 2031.
- Extends, from January 1, 2026, to January 1, 2032, the requirement for the CPUC to establish the “Access for All” (AFA) program—the transportation network company (TNC) wheelchair-accessible vehicle (WAV) program—until January 1, 2032, including extending the $0.05 charge for each completed TNC trip.
FISCAL EFFECT:
The CPUC contends it would need a full-time scheduler to handle “year-round” scheduling requests. This seems unlikely. More realistic is that requests from the Legislature for commissioner appearance would be rare and, in most instance predictable. The committee assumes the CPUC could handle such requests with existing resources.
The CPUC describes the DDTP surcharge collection and program oversight as ongoing and absorbable.
Similarly, the CPUC asserts it can continue the AFA program with existing resources.
COMMENTS:
- Purpose. The author—the Assembly Committee on Communications and Conveyance—describes this bill as “a committee omnibus bill that includes several topics relative to the jurisdiction of the Communications & Conveyance Committee.” More specifically, the committee chairperson writes:
The contents of this bill cover a scope of issues directly pertaining to the jurisdiction and experience of this committee. Specifically, it extends the state’s ability to fund two programs administered by the CPUC that provide critical assistance to disabled Californians. The bill also includes new accountability measures for the CPUC based on this committee’s experience in engaging in oversight of the CPUC’s programs during a committee oversight hearing, wherein the committee discovered concerning trends about CPUC Commissioner attendance at hearings.
- Background. This bill has three distinct components.
Compelling CPUC Commissioner Appearance at Committee. First, it requires a commissioner of the CPUC to appear at a legislative hearing, at the request of the chairperson of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the CPUC. Existing law requires the president of the CPUC to annually appear before the appropriate policy committees of the Senate and Assembly to present the CPUC Annual Report. Other than that, there is no law requiring a CPUC commissioner to appear before the Legislature.
Staff to the authoring committee describes frustration on the part of the committee chairperson and committee members whose requests for an appearance by a CPUC commissioner before the committee were ignored. For its part, the CPUC describes the situation as a consequence of miscommunication.
Renewing the Deaf and Disabled Telecommunications Program. The bill renews the requirement on the CPUC to collect the surcharge to fund DDTP and extends it until January 1, 2031. This statutory requirement ended on January 1, 2025. DDTP, also known as California Connect, is a state-mandated program under the CPUC that provides accessible telecommunications services for individuals with disabilities. DDTP offers specialized equipment, relay services, and Augmentative and Alternative Communication (AAC) programs to support independent and functionally equivalent communication. Existing law authorizes the CPUC to collect up to $100 million per year to fund the program. The program is funded through a dedicated surcharge, which is assessed and collected by telecommunications companies on their customers.
The CPUC notes this provision of the bill duplicates language already included in the Administration’s telecommunications budget trailer bill and recommends removing it from this bill to avoid redundancy.
Extending the Access for All Program. This bill extends, from January 1, 2026, to January 1, 2032, the requirement for the CPUC to establish the AFA program—the TNC wheelchair-accessible vehicle (WAV) program—until January 1, 2032, including extending the $0.05 charge for each completed TNC trip.
The committee is aware of neither support for, nor opposition to this bill.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: April 30, 2025
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
ABPCA Bill Id:AB 1532 (
Author:Committee on Communications and Conveyance) – As Introduced Ver:March 28, 2025
SUBJECT: Public Utilities Commission
SUMMARY: Of relevance to this committee, this bill imposes new conditions on commissioners of the California Public Utilities Commission (CPUC), specifically around attendance at CPUC and legislative hearings, and requires the Little Hoover Commission to submit a report with recommendations to the Legislature related to commissioner attendance. Specifically, this bill:
- Requires a CPUC commissioner, in order to receive their salary, to attend no less than 25% of the hearings that are part of a ratesetting proceeding in the preceding year, following their first year as a commissioner.
- Requires the CPUC to adopt rules governing commissioner attendance at CPUC hearings.
- Requires a commissioner to appear at a legislative hearing, at the request of the Chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the CPUC.
- Requires on or before January 1, 2027, the Milton Marks “Little Hoover” Commission on California State Government Organization and Economy to submit a report with recommendations to the Legislature and the Governor for increasing commissioner attendance at CPUC hearings and improving the commission’s timelines in resolving proceedings.
- Extends the requirement on the CPUC to collect the surcharge to fund the Deaf and Disabled Telecommunications Program (DDTP) until January 1, 2031.
- Extends the requirement for the CPUC to establish the “Access for All” (AFA) program, the transportation network company (TNC) wheelchair-accessible vehicle (WAV) program, until January 1, 2032, including extending the $0.05 charge for each completed TNC trip.
EXISTING LAW:
- Establishes the membership of the CPUC, and the qualifications and tenure of the members of the commission. (California Constitution Article XII § 1)
- Requires commissioners to be civil executive officers and requires their salaries to be fixed by law and paid in the same manner as the salaries of other state officers. (Public Utilities Code § 304)
- Requires the president of the CPUC to annually appear before the appropriate policy committees of the Senate and Assembly to present the CPUC Annual Report. (Public Utilities Code § 321.6)
- Requires the CPUC to report annually to the Legislature on the status of its proceedings, specifically, on timeliness in resolving cases, information on the disposition of applications for rehearing, and the number of days that Commissioners presided in hearings. (Public Utilities Code § 910.1)
- Establishes the Milton Marks “Little Hoover” Commission on California State Government Organization and Economy. (Government Code § 8501)
- Provides that the purpose of the Legislature in creating the Little Hoover Commission is to secure assistance for the Governor and itself in promoting economy, efficiency, and improved service in the transaction of the public business in the various departments, agencies, and instrumentalities of the executive branch of the state government, and in making the operation of all state departments, agencies, and instrumentalities, and all expenditures of public funds, more directly responsive to the wishes of the people as expressed by their elected representatives. (Government Code § 8521)
- Establishes the Deaf and Disabled Telecommunications Program (DDTP) and requires the CPUC to administer a surcharge to collect revenues of up to $100,000,000 per year until January 1, 2025, subject to an annual appropriation of moneys by the Legislature, to allow providers of equipment and service pursuant to the DDTP to recover their costs as they are incurred. (Public Utilities Code § 2881)
- Requires the CPUC, until January 1, 2026, to establish the TNC-WAV program known as “Access for All” (AFA). Among other program requirements, AFA requires each TNC to pay to the CPUC an amount equivalent to, at a minimum, $0.05 for each TNC trip completed using the TNC’s online-enabled application or platform to fund the program. (Public Utilities Code § 5440.5)
FISCAL EFFECT: Unknown. This bill is keyed fiscal, and will be referred to the Assembly Committee on Appropriations for its review.
CONSUMER COST IMPACTS: As it relates to electricity and natural gas service, unknown or negligible cost impacts. As it relates to telecommunications and TNC service, slight increases to consumer costs for the fee extensions to support the DDTP and the AFA programs, respectively. According to the Legislative Counsel, the provisions of this bill relating to these surcharges are considered a tax. Thus, this bill would require the approval of 2/3 of the membership of each house of the Legislature for passage.
BACKGROUND:
CPUC History – In 1911, the California Railroad Commission was established by constitutional amendment. The Commission has since been renamed the CPUC and grown its regulatory authority since that time to include privately owned telecommunications, energy, water, passenger transportation and in-state moving companies. The CPUC is responsible for licensing, fixing rates, establishing rules and implementing safety regulations for these utilities. The CPUC presides over hearings in order to issue decisions and orders. These hearings are open to ratepayers, utilities, consumer advocacy and industry organizations.[1]
CPUC Commissioners – Pursuant to Section 1 of Article XII of the California Constitution, the CPUC has five commissioners appointed by the Governor, and confirmed by the Senate, with each commissioner serving six-year staggered terms. Commissioners cannot have an official relation to or a financial interest in anything regulated by the CPUC.[2] In addition, no executive of a public utility may serve as a commissioner within two years of working for a utility. Commissioners meet at monthly (often semi-monthly) business meetings to vote on pending items. Commissioners serve full-time and receive a salary as civil executive officers. The Governor designates the president of the CPUC, pursuant to Public Utilities Code § 305, among the five commissioners. The president presides at meetings and sessions of the CPUC and directs the executive director, the attorney, and other staff of the CPUC. The president of the CPUC is also required to annually appear before the appropriate policy committees of the Senate and Assembly to present its annual report, required pursuant to Public Utilities Code § 910.
DDTP – The Deaf and Disabled Telecommunications Program (DDTP), also known as California Connect, is a state-mandated program that provides accessible telecommunications services for individuals with disabilities. This program was first codified in 1982 and most recently was extended in 2019 by AB 497 (Santiago, Chapter 2019, Statutes of 2019). DDTP offers specialized equipment, relay services, and Augmentative and Alternative Communication (AAC) programs to support independent and functionally equivalent communication. The program helps people with disabilities stay connected with loved ones, complete daily tasks, and access emergency services. Relay Services and AAC devices facilitate communication with life-saving services such as 9-1-1 and 9-8-8. The funding authorization for the program expired on January 1, 2025.
According to the CPUC, in 2023-2024 DTTP provided specialized equipment for 6,170 new customers with specific needs.[3] The relay services, which relay conversations back and forth over the telephone for disabled individuals, were used for 297,805 calls. The program also provided 885 long-term device iPads and 1,262 short-term device iPads to participants who needed assistance with speech related disabilities.
In fiscal year 2023-2024, the program generated $68.5 million, with $59.6 million in expenditures. The program's funding continues to be sustained through a dedicated surcharge, which is assessed and collected by telecommunications companies, including VoIP providers. This surcharge is presented on customer bills and applied to intrastate charges on customer bills of all telecommunication service providers. As of April 2023, California modified the surcharge collection methodology from six separate surcharges to one flat rate ($1.11 per access line) to fund California's six universal service programs, including DDTP. The 2023-2024 ending fund balance was $73.2 million.
AFA – The Access for All Program (AFA) was developed to implement SB 1376 (Hill, Chapter 701, Statutes of 2018). The program began implementation in the third quarter of 2019, and is designed to encourage growth in the availability of on-demand transportation that meets the mobility needs of persons with disabilities, including wheelchair users who need a WAV. This is achieved by collecting a per-trip fee on all TNC (i.e., Uber and Lyft) trips that originate in California, which is then re-invested in WAV service.
Pursuant to existing law, the CPUC recently assessed whether WAV service is within service benchmarks established by the CPUC,[4] which covers various features of service, including presence of WAVs across hours of the day, decrease in WAV-related expenditures, promotion of WAV service through outreach and engagement, and occurrence of complaints from WAV customers. The findings show that TNCs have the ability to meet and exceed program goals in most key performance areas in some counties, but there is still room for improvement and more to be learned about statewide feasibility of offering on-demand WAV service. The report did make recommendations to the Legislature to improve the program. Specifically, augmenting timelines for entities participating in the program to be disbursed funds on an annual basis, instead be biennial. The CPUC suggests that doing so may help resource constraints on the part of participants, but also could increase participation overall. The Legislature may wish to consider such program changes in the future. The statutory authorization for this program expires on January 1, 2026.
COMMENTS:
- Author’s Statement. This bill is a committee omnibus bill by the Assembly Committee on Communications and Conveyance (C&C). According to the Committee’s Chair, “The content of this bill covers a scope of issues directly pertaining to the jurisdiction and experience of this [the Communications & Conveyance] committee. Specifically, it extends the state’s ability to fund two programs administered by the CPUC that provide critical assistance to disabled Californians. The bill also includes new accountability measures for the CPUC based on this committee’s experience in engaging in oversight of the CPUC’s programs during a committee oversight hearing, wherein the committee discovered concerning trends about CPUC Commissioner attendance at hearings.”
- Up for Consideration. This bill has two broad categories of proposals: the first, related to CPUC commissioner attendance, is the primary jurisdiction of this committee and will be the focus of this analysis. The second, related to extensions of programs and associated fees for accessible telecommunications and rideshare services, is the primary jurisdiction of the C&C Committee and will be considered during that committee’s hearing on the measure.
- Commissioner Attendance at the Legislature. This bill would impose new conditions on commissioners of the CPUC. The authors of this measure intend for these new requirements to provide greater accountability and responsiveness by the CPUC to the Legislature. These new requirements all center on commissioner attendance, either at CPUC or legislative hearings. The bill proposes four solutions to increase commissioner attendance: 1) require a commissioner to be present at any legislative hearing of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the CPUC, if requested by the committee’s chair; 2) require the CPUC to adopt rules governing commissioner attendance at hearings; 3) require the Little Hoover Commission to recommend improvements to commissioner attendance at CPUC hearings and timeliness in resolving proceedings; and 4) tie commissioner salary to hearing attendance, requiring commissioners to attend 25% of hearings of ratesetting proceedings or forfeit their annual salary.
The C&C Committee members authoring this measure motivate these requirements with direct experience, citing lack of presence of CPUC commissioners at legislative oversight and informational hearings of the C&C committee. According to C&C committee staff, CPUC commissioners declined to attend a joint oversight hearing of the committee in 2024, and again initially declined attendance in early 2025. The refusals escalated to the degree that the C&C Committee Members sent a letter to CPUC President Alice Reynolds in February 2025, noting their growing frustration and disappointment with the situation:
“We [Members of C&C] were elected to come to Sacramento to advance their [Californians] interest, and we are committed to doing so. While we do not question the qualifications or ability of your executive staff, and certainly the value in having them present, ultimately staff are not representatives with the constitutional and statutory authority to adopt the rules and regulations that govern implementation of the billions of dollars that the CPUC administers do.”[5]
Two days later, the CPUC responded to the letter, and Commissioner John Reynolds attended the February 12, 2025, C&C hearing.
- Commissioner Attendance at the CPUC. Public Utilities Code § 910.1 requires the CPUC to report annually on the status of its proceedings, specifically, on timeliness in resolving cases, information on the disposition of applications for rehearing, and the number of days that Commissioners presided in hearings. There are four types of proceeding categories: adjudicatory, ratesetting, quasi-legislative, and catastrophic wildfire, as summarized in Table 1 below.
Table 1: Summary of CPUC Proceeding Categories and Associated Rules.[6]
Type of Proceeding | Purpose | Resolution Deadline | Extensions |
Adjudicatory Proceedings | Investigate and adjudicate possible violations of state or Commission rules | 12 months | Not specified |
Ratesetting Proceedings | Set or investigate rates that regulated entities charge customers | 18 months | Longer deadline possible via scoping memo or Commission order |
Quasi-legislative Proceedings | Establish policies or rules affecting regulated entities | 18 months | Longer deadline possible via scoping memo or Commission order |
Catastrophic Wildfire Proceedings | Address catastrophic wildfire issues (e.g., damages, recovery) | Proposed decision must be issued within 12 months | Not specified |
CPUC proceedings are often complex and involve input from many stakeholders. Administrative Law Judges (ALJs) and Commissioners review testimony, comments, and other feedback before making decisions, while aiming to resolve issues on time. Stakeholders, who usually become official parties to the case, include utilities, industry groups, consumer advocates, nonprofits, local governments, and others. Their participation is essential to ensure decisions are well-informed and balanced. Proceedings traditionally have one ALJ and one assigned Commissioner. The ALJ, often jointly with the assigned Commissioner, will issue a proposed decision (PD) on matters with a proceeding; the PD is subject to party comment before a final vote and adoption by the full Commission. Not all proceedings have hearings, nor do the assigned commissioners attend all that do. For those that have hearings, the hearings may range from prehearing conferences (where the scope and focus of the hearing is discussed), evidentiary hearings (where discovery and disclosure of information occurs on the record), and oral arguments (where parties bring their final case before the CPUC). The CPUC also holds public workshops to discuss matters of policy or import; such workshops are not considered “hearings” for reporting purposes.
The 2024 attendance numbers, reported pursuant to Public Utilities Code § 910.1, note 216 proceedings in 2024 with 273 hearing days; at least 1 commissioner was present for 65 hearings, roughly 23% of total hearing days.[7] It is unclear how many of these hearings were for the same or different proceedings, or the distribution of attendance amongst the four proceeding types. Nevertheless, the report does show Commissioners did not preside over a single hearing in 2024.
- Mounting Frustrations. Members throughout the Legislature, and the public more broadly, have expressed concern with the CPUC’s performance and outcomes particularly as it relates to ratepayer costs, processes delays, commissioner presence, and general efficiency. The sentiment that some Members of C&C Committee have expressed, in authoring this measure, is that perhaps due to the agency’s vast regulatory purview of industries and responsibilities, the CPUC may benefit from reforms to focus its attention. Certainly, there is an interest in requiring greater attendance of commissioners; however, there may be legitimate structural reasons why attendance has been low. The data reported pursuant to Public Utilities Code § 910.1 does not paint a favorable light. But it may also be incomplete, and lacks adequate description. To put in legislative terms, are CPUC hearings like Legislative policy hearings where Member presence is always required to hear and act upon bills; or are they like stakeholder meetings held by Member staff to understand the scope of issues on a bill, and to inform a report to the Members, who then vote upon the related measure at a final hearing. Both are plausible analogies; but the nuance is missing in the reported numbers.
It is unclear if the solutions presented in this bill to motivate commissioner presence will result in the desired outcome. For example, tying a commissioner’s salary to attendance at certain hearings may be a reasonable mechanism to ensure their presence, but not one to ensure engagement nor more accountability. Given these considerations, the committee recommends striking Sections 1 and 3 of the bill, related to commissioner salary and the Little Hoover report, and retaining the requirements that commissioners must appear before the Legislature when asked and that the CPUC shall adopt internal rules regarding hearing attendance. Sections 5 and 6 of the bill, related to extensions of programs and associated fees for accessible telecommunications and rideshare services, will remain.
- Related Legislation.
AB 13 (Ransom, 2025) establishes additional legislative oversight and proposes reform of the CPUC, to include, among other mandates, specific requirements for CPUC commissioner appointees and additional CPUC reporting requirements to the Legislature. Status: in the Assembly Committee on Appropriations, after passage in this committee on March 26, 2025, on a 18-0-0 vote.
- Prior Legislation.
AB 497 (Santiago) extends the sunset date on the DDTP until January 1, 2025, and the date through which the CPUC must annually report on the Program until January 1, 2026. Status: Chapter 2019, Statutes of 2019.
SB 1376 (Hill) established the AFA program, including requiring the CPUC to assess a fee on TNC rides to fund AFA. Sunset the program in January 2026. Status: Chapter 701, Statutes of 2018.
SB 129 (Wright, Chapter 332, Statutes of 2013) extended the DDTP surcharge sunset date to January 1, 2020.
- Double Referral. This bill is double referred. It is set for hearing in the Assembly Committee on Communications and Conveyance on April 30, 2025. Upon passage in that committee it will be immediately transmitted to this committee for its consideration.
REGISTERED SUPPORT / OPPOSITION:
Support
None on file.
Opposition
None on file.
Analysis Prepared by: Laura Shybut / U. & E. / (916) 319-2083
CPUC, 2021, Rules of Practice and Procedure ↑
Public Utilities Code § 303. ↑
CPUC, 2023-2024 California Connect Annual Report, March 1, 2025; https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/communications-division/documents/ddtp/ddtp-annual-reports/california-connect-annual-report--20232024--accesible-final-uploaded-onto-cpuc-website.pdf ↑
2024 TNC Access for All Program Annual Report. https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/consumer-protection-and-enforcement-division/documents/tlab/accessforall/cpuc_legislative-report_access-for-all_dec-2023.pdf ↑
C&C Committee letter to Alice Reynolds; February 10, 2025; regarding February 12th oversight hearing on “California’s Broadband Programs.” ↑
CPUC; Resolution of Proceedings, Disposition of Applications for Rehearing, and Commissioner Presence at Hearings, 2024 Public Utilities Code § 910.1 Report. Submitted: January 31, 2025. https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/news-and-outreach/reports/annual-reports/2024-annual-report-with-assignment.pdf ↑
Appendix L; CPUC; Resolution of Proceedings, Submitted: January 31, 2025. Ibid. ↑
Date of Hearing: April 30, 2025
ASSEMBLY COMMITTEE ON COMMUNICATIONS AND CONVEYANCE
Tasha Boerner, Chair
ABPCA Bill Id:AB 1532 (
Author:Committee on Communications and Conveyance) – As Introduced Ver:March 28, 2025
SUBJECT: Public Utilities Commission
SUMMARY: This bill would extend the surcharge authority for the Deaf and Disabled Telecommunications (DDTP) program, would also extend the authority for the transportation network company (TNC) wheelchair-accessible vehicle (WAV) program, known as the “Access for All” (AFA) program. Additionally, this bill would impose new conditions on commissioners of the California Public Utilities Commission (CPUC), require the Little Hoover Commission to submit a report with recommendations to the Legislature related to the CPUC.
Specifically, this bill:
- Extends the requirement on the CPUC to collect the surcharge to fund the DDTP until January 1, 2031.
- Extends the requirement for the CPUC to establish the AFA program until January 1, 2032, including extending the $0.05 charge for each completed TNC trip.
- Requires a CPUC commissioner, following their first year as a commissioner to attend no less than 25% of the hearings that are part of a rate setting proceeding in the preceding year to receive their full salary.
- Requires the CPUC to adopt rules governing commissioner attendance at CPUC hearings.
- Requires, at the request of the chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the commission, a commissioner to appear at a legislative hearing.
- Requires on or before January 1, 2027, the Milton Marks “Little Hoover” Commission on California State Government Organization and Economy to submit a report with recommendations to the Legislature and the Governor for increasing commissioner attendance at commission hearings and improving the commission’s timelines in resolving proceedings.
EXISTING LAW:
- Establishes the Deaf and Disabled Telecommunications Program (DDTP) and requires the CPUC to administer a surcharge to collect revenues of up to $100,000,000 per year until January 1, 2025, subject to an annual appropriation of moneys by the Legislature, to allow providers of equipment and service pursuant to the DDTP to recover their costs as they are incurred. (Public Utilities Code § 2881)
- Requires the CPUC, until January 1, 2026, to establish the transportation network company (TNC) wheelchair accessible vehicle (WAV) known as the Access for All program relating to accessibility for persons with disabilities. Among other program requirements, the act requires each TNC to pay to the CPUC an amount equivalent to, at a minimum, $0.05 for each TNC trip completed using the TNC’s online-enabled application or platform to fund the program. (Public Utilities Code § 5440.5)
- Establishes the Milton Marks “Little Hoover” Commission on California State Government Organization and Economy. (Government Code § 8501)
- Provides that the purpose of the Legislature in creating the Little Hoover Commission is to secure assistance for the Governor and itself in promoting economy, efficiency, and improved service in the transaction of the public business in the various departments, agencies, and instrumentalities of the executive branch of the state government, and in making the operation of all state departments, agencies, and instrumentalities, and all expenditures of public funds, more directly responsive to the wishes of the people as expressed by their elected representatives. (Government Code § 8521)
- Establishes the membership of the CPUC, and the qualifications and tenure of the members of the commission. (California Constitution Article XII § 1)
- Requires commissioners to be civil executive officers and requires their salaries to be fixed by law and paid in the same manner as the salaries of other state officers. (Public Utilities Code § 304)
- Requires the president of the commission to annually appear before the appropriate policy committees of the Senate and Assembly to present the CPUC Annual Report. (Public Utilities Code § 321.6)
- Requires the CPUC to report annually to the Legislature on the status of its proceedings, specifically, on timeliness in resolving cases, information on the disposition of applications for rehearing, and the number of days that Commissioners presided in hearings. (Public Utilities Code § 910.1)
FISCAL EFFECT: Unknown. This bill has been keyed fiscal by the Legislative Counsel.
COMMENTS:
- Committee Omnibus. This bill is a committee omnibus bill that includes several topics relative to the jurisdiction of the Communications & Conveyance Committee. To the extent that this bill also relates to the California Public Utilities Commission in particular, this bill has also been referred to the Utilities & Energy Committee which has primary jurisdiction of CPUC. According to the Chair of this Committee: “The contents of this bill cover a scope of issues directly pertaining to the jurisdiction and experience of this committee. Specifically, it extends the state’s ability to fund two programs administered by the CPUC that provide critical assistance to disabled Californians. The bill also includes new accountability measures for the CPUC based on this committee’s experience in engaging in oversight of the CPUC’s programs during a committee oversight hearing, wherein the committee discovered concerning trends about CPUC Commissioner attendance at hearings.”
- Two-Third Vote Threshold. According to the Legislative Counsel, the provisions of this bill relating to surcharges are considered a change in state statute that would result in a taxpayer paying a higher tax within the meaning of the California Constitution. Thus, this bill would require the approval of 2/3 of the membership of each house of the Legislature for passage.
- Deaf and Disabled Telecommunications Program. The Deaf and Disabled Telecommunications Program (DDTP), also known as California Connect, is a state-mandated program under the California Public Utilities Commission (CPUC) that provides accessible telecommunications services for individuals with disabilities. This program was first codified in 1982 and most recently was extended in 2019 by AB 497 (Santiago). The funding authorization for the program has expired as of January 1, 2025, which is why the program is proposed to be extended.
DDTP offers specialized equipment, relay services, and Augmentative and Alternative Communication (AAC) programs to support independent and functionally equivalent communication. The program helps people with disabilities stay connected with loved ones, complete daily tasks, and access emergency services. Relay Services and Augmentative and Alternative Communication (AAC) devices facilitate communication with life-saving services such as 911 and 988.
According to the CPUC[1], in 2023-2024 the program provided specialized equipment for 6,170 new customers with specific needs. The relay services, which relay conversations back and forth over the telephone for disabled individuals, was used for 297,805 calls. The program also provided 885 long-term device iPads and 1,262 short-term device iPads to participants that needed assistance with speech related disabilities.
Existing law authorizes the CPUC the collect up to $100,000,000 per year to fund the program. In fiscal years 2023-2024 the program generated $68.5 million, of which only about 4% was used on administrative costs according to the CPUC. The program's funding continues to be sustained through a dedicated surcharge, which is assessed and collected by telecommunications companies, including VoIP providers. This surcharge is presented on customer bills and applied to intrastate charges on customer bills of all telecommunication service providers. As of April 2023, California modified the surcharge collection methodology from six separate surcharges to one flat rate to fund California's six universal service programs, including California Connect.
- Access for All Program. The Access for All Program (“AFA”) was developed to implement SB 1376 (Hill, 2018), which directed the California Public Utilities Commission (CPUC) to establish a program to increase the availability of on-demand transportation for persons with disabilities, including wheelchair users who need a wheelchair-accessible vehicle (WAV). The program began implementation in the third quarter of 2019 and is designed to encourage growth in the availability of on-demand transportation that meets the mobility needs of persons with disabilities, including wheelchair users who need a WAV. This is achieved by collecting a per-trip fee on all transportation network company (TNC) trips that originate in California, which is then re-invested in WAV service.
Pursuant to existing law, the CPUC recently assessed[2] whether WAV service is within service benchmarks established by the CPUC, which covers various features of service, including presence of WAVs across hours of the day, decrease in WAV-related expenditures, promotion of WAV service through outreach and engagement, and occurrence of complaints from WAV customers. The findings show that TNCs have an ability to meet and exceed program goals in most key performance areas in some counties, but there is still room for improvement and more to be learned about statewide feasibility of offering on-demand WAV service. The report did make recommendations to the Legislature to improve the program. Specifically, augmenting timelines for entities participating in the program to be disbursed funds on an annual basis, to instead be biennial. The CPUC suggests that doing so may help resource constraints on the part of participants, but also could increase participation overall. The committee may wish to consider this change in the future.
- Oversight and Accountability for CPUC. This bill would impose new conditions on commissioners of the California Public Utilities Commission and the organization generally. These new requirements are intended to provide greater accountability for the organization and responsiveness by the CPUC to the Legislature. First and foremost, this bill proposes to expand existing law that requires the President of the CPUC to an annual report to the appropriate policy committees of the Legislature. This bill expands that existing requirement to also require a commissioner to be present at any legislative hearing at the request of the Chair of a Senate or Assembly committee with jurisdiction over budget or policy matters concerning the commission. This year and in years past, this committee and others have had a difficult experience gaining the cooperation of commissioners to attend legislative oversight and informational hearings. In some instances, there has been a plain refusal to participate, which is unacceptable and disregards the proper role of the Legislature to conduct oversight of state agencies.
Upon further inspection, this committee has also learned based on reports to the Legislature that commissioners also do not appear to attend or preside over the majority of hearings of their own agency. While some of this can be explained by the delegation of roles and responsibilities to administrative law judges, on their face the numbers are startling and a cause for concern. “Appendix L” below is taken from a mandated report[3] to the Legislature on commissioner attendance at hearings and the disposition of proceedings. The data show that of all the hearings recorded, commissioners spent zero days presiding over hearings. Commissioners were also only present for less than 25% of the total hearing days.
Given the additional concern about commissioner attendance at the CPUC’s own hearings, this bill also would require the CPUC adopt rules governing commissioner attendance at CPUC hearings. Lastly, this bill would require commissioners to attend at least 25% of rate setting proceedings in order to receive a full salary. Moving forward, the committee may wish to consider whether tying a commissioner salary to attendance at certain hearings is a reasonable mechanism to ensure more accountability. Certainly, there is an interest in requiring greater attendance; however, there may be legitimate structural reasons why attendance has been low that the Little Hoover Commission report may identify.
- Report by the Little Hoover Commission. The Little Hoover Commission, formally known as the Milton Marks “Little Hoover” Commission on California State Government Organization and Economy, is an independent state oversight agency created in 1962. The Commission’s mission is to investigate state government operations and policy, and – through reports and legislative proposals – make recommendations to the Governor and Legislature to promote economy, efficiency and improved service in state operations. In addition, the Commission has a statutory obligation to review and make recommendations on all proposed government reorganization plans. The Commission has broad and independent authority to evaluate the structure, organization, operation and function of every department, agency and executive branch of state government, along with the policies and methods for appropriating and administering funds. Unlike fiscal or performance audits, the Commission’s studies look beyond whether programs comply with existing statutes and regulations. They instead explore how programs can and should function today and in the future.
Recently Members of this committee have expressed concern with the CPUC’s performance and outcomes particularly as it relates to ratepayer costs, processes delays, commissioner attendance at hearings and general inefficiency. The sentiment that some Members have expressed is that perhaps, due to the agency’s vase regulatory purview of industries and responsibilities, the organization and the public may benefit from reforms to reorganize its operations. In response to those concerns, this bill would require the Little Hoover Commission to submit a report to the Legislature and Governor focused on increasing commissioner attendance at commission hearings and improving the commission’s timelines in resolving proceedings. This bill would require analysis on specified metrics, such as commissioner attendance at particular types of hearings, such as hearings for proceedings that resulted in a rate increase or hearings specific to telecommunications, broadband, and transportation. Through the analysis, the intent is that the Little Hoover Commission can help the Legislature and Governor better understand the amount of time Commissioners have dedicated to the various types of proceedings in their purview, especially those related to telecommunications or that resulted in a rate increase.
- Amendments. This bill will be heard in Assembly Utilities & Energy Committee immediately following adjournment of this committee on Wednesday April 30, 2025. Therefore, there is no time to process policy amendments discussed in this analysis. Instead, the Chair recommends adopting suggested amendments in the next committee. The amendments would:
- Strike Section 1 of this bill requiring commissioners to attend a certain amount of ratesetting hearings to receive a full salary.
- Strike Section 3 of this bill requiring a study by the Little Hoover Commission.
- Similar/related legislation.
- AB 705 (Boerner) of this session transfers the internal audit unit of the California Public Utilities Commission (CPUC) to a newly established Independent Office of Audits and Investigations (“Audits Office”) within the CPUC, to be overseen by an Inspector General.
REGISTERED SUPPORT / OPPOSITION:
Support
None on file.
Opposition
None on file
Analysis Prepared by: Emilio Perez / C. & C. / (916) 319-2637
2023-2024 California Connect Annual Report. https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/communications-division/documents/ddtp/ddtp-annual-reports/california-connect-annual-report--20232024--accesible-final-uploaded-onto-cpuc-website.pdf ↑
2024 TNC Access for All Program Annual Report. https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/consumer-protection-and-enforcement-division/documents/tlab/accessforall/cpuc_legislative-report_access-for-all_dec-2023.pdf ↑
2024 Public Utilities Code § 910.1 Report. https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/news-and-outreach/reports/annual-reports/2024-annual-report-with-assignment.pdf ↑
Discussed in Hearing
Assembly Floor
Senate Floor
Senate Standing Committee on Transportation
Senate Standing Committee on Energy, Utilities and Communications
Assembly Floor
Assembly Standing Committee on Appropriations
Assembly Standing Committee on Communications and Conveyance
Assembly Standing Committee on Utilities and Energy
Bill Author
Bill Co-Author(s):