AB 1658: Local Agency Public Construction Act: change orders: County of Los Angeles: County of Santa Clara.
- Session Year: 2025-2026
- House: Assembly
- Latest Version Date: 2026-06-30
Current Status:
Passed
(2026-06-30: Chaptered by Secretary of State - Chapter 41, Statutes of 2026.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law, the Local Agency Public Construction Act, regulates contracting by local agencies, including counties and special districts. The act includes specific provisions for contracting by counties and contracting for county highways, bridges, and subways, and county waterworks districts. Those provisions include change order authorization for contracts, as prescribed, and impose caps on the extra cost of any change order, varying with the value of the original contract. Existing law, until January 1, 2027, authorizes the County of Los Angeles and the County of Santa Clara to add a change order cap of $400,000 for contracts whose original cost exceeds $25,000,000 and of $750,000 for contracts whose original cost exceeds $50,000,000, both of which are adjusted annually to reflect the percentage change in the California Consumer Price Index. Existing law imposes similar caps for both counties with regard to county highways and similar caps for the County of Los Angeles with regard to county bridges, subways, waterworks districts, and the Los Angeles County Flood Control District. That law requires the provisions specific to the County of Los Angeles and the County of Santa Clara modify no more than 7 contracts and requires those counties to provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.
This bill would no longer require the County of Los Angeles and the County of Santa Clara to modify no more than 7 contracts and no longer require those counties to provide a review report, as described above. The bill would delete the January 1, 2027, repeal date, thereby extending these provisions indefinitely.
This bill would make legislative findings and declarations as to the necessity of a special statute for the County of Santa Clara and the County of Los Angeles.
Existing law, the Local Agency Public Construction Act, regulates contracting by local agencies, including counties and special districts. The act includes specific provisions for contracting by counties and contracting for county highways, bridges, and subways, and county waterworks districts. Those provisions include change order authorization for contracts, as prescribed, and impose caps on the extra cost of any change order, varying with the value of the original contract. Existing law, until January 1, 2027, authorizes the County of Los Angeles and the County of Santa Clara to add a change order cap of $400,000 for contracts whose original cost exceeds $25,000,000 and of $750,000 for contracts whose original cost exceeds $50,000,000, both of which are adjusted annually to reflect the percentage change in the California Consumer Price Index. Existing law imposes similar caps for both counties with regard to county highways and similar caps for the County of Los Angeles with regard to county bridges, subways, waterworks districts, and the Los Angeles County Flood Control District. That law requires the provisions specific to the County of Los Angeles and the County of Santa Clara modify no more than 7 contracts and requires those counties to provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.
This bill would no longer require the County of Los Angeles and the County of Santa Clara to modify no more than 7 contracts and no longer require those counties to provide a review report, as described above. The bill would delete the January 1, 2027, repeal date, thereby extending these provisions indefinitely.
This bill would make legislative findings and declarations as to the necessity of a special statute for the County of Santa Clara and the County of Los Angeles.
Existing law, the Local Agency Public Construction Act, regulates contracting by local agencies, including counties and special districts. The act includes specific provisions for contracting by counties and contracting for county highways, bridges, and subways, and county waterworks districts. Those provisions include change order authorization for contracts, as prescribed, and impose caps on the extra cost of any change order, varying with the value of the original contract. Existing law, until January 1, 2027, authorizes the County of Los Angeles and the County of Santa Clara to add a change order cap of $400,000 for contracts whose original cost exceeds $25,000,000 and of $750,000 for contracts whose original cost exceeds $50,000,000, both of which are adjusted annually to reflect the percentage change in the California Consumer Price Index. Existing law imposes similar caps for both counties with regard to county highways and similar caps for the County of Los Angeles with regard to county bridges, subways, waterworks districts, and the Los Angeles County Flood Control District. That law requires the provisions specific to the County of Los Angeles and the County of Santa Clara modify no more than 7 contracts and requires those counties to provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.
This bill would no longer require the County of Los Angeles and the County of Santa Clara to modify no more than 7 contracts and no longer require those counties to provide a review report, as described above. The bill would delete the January 1, 2027 repeal date, thereby extending these provisions indefinitely.
This bill would make legislative findings and declarations as to the necessity of a special statute for the County of Santa Clara and the County of Los Angeles.
(a)The board of supervisors may, by ordinance, resolution, or board order, authorize the county engineer, or other county officer, to order changes or additions in the work being performed under construction contracts. When so authorized, any change or addition in the work shall be ordered in writing by the county engineer, or other designated officer, and the extra cost to the county for any change or addition to the work so ordered shall not exceed five thousand dollars ($5,000) when the total amount of the original contract does not exceed fifty thousand dollars ($50,000), nor 10 percent of the amount of any original contract that exceeds fifty thousand dollars ($50,000), but does not exceed two hundred fifty thousand dollars ($250,000).
(b)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (c) and (d), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).
(c)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
(d)The County of Santa Clara may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
SEC. 2.Section 20142 of the Public Contract Code, as added by Section 2 of Chapter 95 of the Statutes of 2021, is repealed.SEC. 3.Section 20395 of the Public Contract Code, as amended by Section 2 of Chapter 281 of the Statutes of 2023, is amended to read:20395.(a) In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board of supervisors may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to have any work upon county highways done under their supervision and direction. The work may be done in any of the following ways:
(1)By letting a contract covering both work and material. In that event, the contract shall be let to the lowest responsible bidder as provided in this article.
(2)By purchasing the material and letting a contract for the performance of the work. In that event, the material shall be bought at the lowest possible cost and the contract let to the lowest responsible bidder as provided in this article.
(3)By purchasing the material and having the work done by day labor, in which case advertising for bids is not required.
(4)(A)By authorizing the county road commissioner or a registered civil engineer under the direction of the county director of transportation to execute changes or additions to the work for any contract pursuant to this section in an amount not to exceed five thousand dollars ($5,000) for contracts of fifty thousand dollars ($50,000) or less, or 10 percent for contracts over fifty thousand dollars ($50,000) but not to exceed two hundred fifty thousand dollars ($250,000). In no event shall any change or addition to the work exceed a net total addition of twenty-five thousand dollars ($25,000).
(B)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (b) and (c), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).
(b)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
(c)The County of Santa Clara may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
(d)By purchasing the material and letting a contract for the work or by letting a contract covering both work and material without advertising for bids when the estimated cost of emergency work necessitated by the imminence or occurrence of a landslide, flood, storm damage, or other emergency exceeds twenty-five thousand dollars ($25,000) and the public interest and necessity demand immediate action to safeguard life, health, or property.
SEC. 4.Section 20395 of the Public Contract Code, as added by Section 4 of Chapter 95 of the Statutes of 2021, is repealed.SEC. 5.Section 20405 of the Public Contract Code, as amended by Section 5 of Chapter 95 of the Statutes of 2021, is amended to read:20405.(a)The board shall afford all bidders an opportunity to examine the plans, specifications, and working details, and shall award the contract to the lowest responsible bidder. The board may provide by resolution that the bids be opened, examined, and declared by an officer designated in the resolution. The resolution shall require that the bids be opened at a public meeting called by the officer and that the results of the bidding be reported to the board at a subsequent regular board meeting. The notice inviting bids shall state the time and place of the public meeting and the name of the designated officer.
(b)All bids for construction work shall be presented under sealed cover and shall be accompanied by one of the following forms of bidders security:
(1)Cash.
(2)A cashiers check made payable to the county.
(3)A certified check made payable to the county.
(4)A bidders bond executed by an admitted surety insurer, made payable to the county.
Upon an award to the lowest bidder, the security of an unsuccessful bidder shall be returned in a reasonable period of time, but in no event shall that security be held by the county beyond 60 days from the time the award is made.
(c)The person to whom the contract is awarded shall execute a bond, approved by the board, for the faithful performance of the contract. The person shall perform the work in accordance with the plans, specifications, and working details, unless all or any of them are modified by a four-fifths vote of the members of the board. In that case, if the cost of the work is reduced by reason of the modification, the person to whom the contract is awarded shall make an allowance on the contract price to the extent of the reduction.
(d)In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to execute changes or additions to the work for any contract made pursuant to this article in an amount not to exceed:
(1)For contracts whose original cost is less than fifty thousand dollars ($50,000), the amount of the change or addition shall not exceed five thousand dollars ($5,000).
(2)For contracts whose original cost is fifty thousand dollars ($50,000), but less than two hundred fifty thousand dollars ($250,000), the amount of the change or addition shall not exceed 10 percent of the amount of the cost of the original contract.
(3)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the cost of the original contract that is in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivision (e), no change or addition shall exceed two hundred ten thousand dollars ($210,000).
(e)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (d) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board delegates authority in the manner specified in subdivision (d) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
SEC. 6.Section 20405 of the Public Contract Code, as added by Section 6 of Chapter 95 of the Statutes of 2021, is repealed.SEC. 7.Section 20614 of the Public Contract Code, as amended by Section 7 of Chapter 95 of the Statutes of 2021, is amended to read:20614.(a) The board of supervisors and the board of directors of the district, if any, may, by ordinance, resolution, or board order, authorize the general manager or other district officer to order changes or additions in the work being performed under contracts made pursuant to this article in an amount not to exceed:
(1)For contracts whose original cost is less than fifty thousand dollars ($50,000), the amount of the change or addition shall not exceed five thousand dollars ($5,000).
(2)For contracts whose original cost is fifty thousand dollars ($50,000), but less than two hundred fifty thousand dollars ($250,000), the amount of the change or addition shall not exceed 10 percent of the amount of the cost of the original contract.
(3)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the cost of the original contract that is in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivision (b), no change or addition shall exceed two hundred ten thousand dollars ($210,000).
(b)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
SEC. 8.Section 20614 of the Public Contract Code, as added by Section 8 of Chapter 95 of the Statutes of 2021, is repealed.SEC. 9.Section 20998 of the Public Contract Code, as amended by Section 9 of Chapter 95 of the Statutes of 2021, is amended to read:20998.(a) The board of supervisors of the district may, by ordinance, resolution, or board order, authorize the chief engineer or other district officer to order changes or additions in the work being performed under contracts made pursuant to this article in an amount not to exceed:
(1)For contracts whose original cost is less than fifty thousand dollars ($50,000), the amount of the change or addition shall not exceed five thousand dollars ($5,000).
(2)For contracts whose original cost is fifty thousand dollars ($50,000), but less than two hundred fifty thousand dollars ($250,000), the amount of the change or addition shall not exceed 10 percent of the amount of the cost of the original contract.
(3)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the cost of the original contract that is in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivision (b), no change or addition shall exceed two hundred ten thousand dollars ($210,000).
(b)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
SEC. 10.Section 20998 of the Public Contract Code, as added by Section 10 of Chapter 95 of the Statutes of 2021, is repealed.SEC. 11.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need for flexibility given the contract costs and schedule constraints of public contracts within the County of Santa Clara.
SEC. 12.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the following unique needs of the County of Los Angeles:
(a)Spanning over 4,000 square miles, the County of Los Angeles is the most populous county in the United States.
(b)With a population of nearly 10 million residents, the County of Los Angeles surpasses all other counties in the United States in terms of population and encompasses more than a quarter of Californias population.
(c)Given the sheer size of its population and the vast infrastructure for critical public services delivery, it is important to ensure that Los Angeles County facilities remain operational and effective at all times to meet community needs.
(a)The board of supervisors may, by ordinance, resolution, or board order, authorize the county engineer, or other county officer, to order changes or additions in the work being performed under construction contracts. When so authorized, any change or addition in the work shall be ordered in writing by the county engineer, or other designated officer, and the extra cost to the county for any change or addition to the work so ordered shall not exceed five thousand dollars ($5,000) when the total amount of the original contract does not exceed fifty thousand dollars ($50,000), nor 10 percent of the amount of any original contract that exceeds fifty thousand dollars ($50,000), but does not exceed two hundred fifty thousand dollars ($250,000).
(b)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (c) and (d), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).
(c)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
(d)The County of Santa Clara may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
SEC. 2.Section 20142 of the Public Contract Code, as added by Section 2 of Chapter 95 of the Statutes of 2021, is repealed.SEC. 3.Section 20395 of the Public Contract Code, as amended by Section 2 of Chapter 281 of the Statutes of 2023, is amended to read:20395.(a) In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board of supervisors may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to have any work upon county highways done under their supervision and direction. The work may be done in any of the following ways:
(1)By letting a contract covering both work and material. In that event, the contract shall be let to the lowest responsible bidder as provided in this article.
(2)By purchasing the material and letting a contract for the performance of the work. In that event, the material shall be bought at the lowest possible cost and the contract let to the lowest responsible bidder as provided in this article.
(3)By purchasing the material and having the work done by day labor, in which case advertising for bids is not required.
(4)(A)By authorizing the county road commissioner or a registered civil engineer under the direction of the county director of transportation to execute changes or additions to the work for any contract pursuant to this section in an amount not to exceed five thousand dollars ($5,000) for contracts of fifty thousand dollars ($50,000) or less, or 10 percent for contracts over fifty thousand dollars ($50,000) but not to exceed two hundred fifty thousand dollars ($250,000). In no event shall any change or addition to the work exceed a net total addition of twenty-five thousand dollars ($25,000).
(B)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (b) and (c), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).
(b)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
(c)The County of Santa Clara may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
(d)By purchasing the material and letting a contract for the work or by letting a contract covering both work and material without advertising for bids when the estimated cost of emergency work necessitated by the imminence or occurrence of a landslide, flood, storm damage, or other emergency exceeds twenty-five thousand dollars ($25,000) and the public interest and necessity demand immediate action to safeguard life, health, or property.
SEC. 4.Section 20395 of the Public Contract Code, as added by Section 4 of Chapter 95 of the Statutes of 2021, is repealed.SEC. 5.Section 20405 of the Public Contract Code, as amended by Section 5 of Chapter 95 of the Statutes of 2021, is amended to read:20405.(a)The board shall afford all bidders an opportunity to examine the plans, specifications, and working details, and shall award the contract to the lowest responsible bidder. The board may provide by resolution that the bids be opened, examined, and declared by an officer designated in the resolution. The resolution shall require that the bids be opened at a public meeting called by the officer and that the results of the bidding be reported to the board at a subsequent regular board meeting. The notice inviting bids shall state the time and place of the public meeting and the name of the designated officer.
(b)All bids for construction work shall be presented under sealed cover and shall be accompanied by one of the following forms of bidders security:
(1)Cash.
(2)A cashiers check made payable to the county.
(3)A certified check made payable to the county.
(4)A bidders bond executed by an admitted surety insurer, made payable to the county.
Upon an award to the lowest bidder, the security of an unsuccessful bidder shall be returned in a reasonable period of time, but in no event shall that security be held by the county beyond 60 days from the time the award is made.
(c)The person to whom the contract is awarded shall execute a bond, approved by the board, for the faithful performance of the contract. The person shall perform the work in accordance with the plans, specifications, and working details, unless all or any of them are modified by a four-fifths vote of the members of the board. In that case, if the cost of the work is reduced by reason of the modification, the person to whom the contract is awarded shall make an allowance on the contract price to the extent of the reduction.
(d)In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to execute changes or additions to the work for any contract made pursuant to this article in an amount not to exceed:
(1)For contracts whose original cost is less than fifty thousand dollars ($50,000), the amount of the change or addition shall not exceed five thousand dollars ($5,000).
(2)For contracts whose original cost is fifty thousand dollars ($50,000), but less than two hundred fifty thousand dollars ($250,000), the amount of the change or addition shall not exceed 10 percent of the amount of the cost of the original contract.
(3)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the cost of the original contract that is in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivision (e), no change or addition shall exceed two hundred ten thousand dollars ($210,000).
(e)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (d) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board delegates authority in the manner specified in subdivision (d) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
SEC. 6.Section 20405 of the Public Contract Code, as added by Section 6 of Chapter 95 of the Statutes of 2021, is repealed.SEC. 7.Section 20614 of the Public Contract Code, as amended by Section 7 of Chapter 95 of the Statutes of 2021, is amended to read:20614.(a) The board of supervisors and the board of directors of the district, if any, may, by ordinance, resolution, or board order, authorize the general manager or other district officer to order changes or additions in the work being performed under contracts made pursuant to this article in an amount not to exceed:
(1)For contracts whose original cost is less than fifty thousand dollars ($50,000), the amount of the change or addition shall not exceed five thousand dollars ($5,000).
(2)For contracts whose original cost is fifty thousand dollars ($50,000), but less than two hundred fifty thousand dollars ($250,000), the amount of the change or addition shall not exceed 10 percent of the amount of the cost of the original contract.
(3)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the cost of the original contract that is in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivision (b), no change or addition shall exceed two hundred ten thousand dollars ($210,000).
(b)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
SEC. 8.Section 20614 of the Public Contract Code, as added by Section 8 of Chapter 95 of the Statutes of 2021, is repealed.SEC. 9.Section 20998 of the Public Contract Code, as amended by Section 9 of Chapter 95 of the Statutes of 2021, is amended to read:20998.(a) The board of supervisors of the district may, by ordinance, resolution, or board order, authorize the chief engineer or other district officer to order changes or additions in the work being performed under contracts made pursuant to this article in an amount not to exceed:
(1)For contracts whose original cost is less than fifty thousand dollars ($50,000), the amount of the change or addition shall not exceed five thousand dollars ($5,000).
(2)For contracts whose original cost is fifty thousand dollars ($50,000), but less than two hundred fifty thousand dollars ($250,000), the amount of the change or addition shall not exceed 10 percent of the amount of the cost of the original contract.
(3)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the cost of the original contract that is in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivision (b), no change or addition shall exceed two hundred ten thousand dollars ($210,000).
(b)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
SEC. 10.Section 20998 of the Public Contract Code, as added by Section 10 of Chapter 95 of the Statutes of 2021, is repealed.SEC. 11.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need for flexibility given the contract costs and schedule constraints of public contracts within the County of Santa Clara.
SEC. 12.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the following unique needs of the County of Los Angeles:
(a)Spanning over 4,000 square miles, the County of Los Angeles is the most populous county in the United States.
(b)With a population of nearly 10 million residents, the County of Los Angeles surpasses all other counties in the United States in terms of population and encompasses more than a quarter of Californias population.
(c)Given the sheer size of its population and the vast infrastructure for critical public services delivery, it is important to ensure that Los Angeles County facilities remain operational and effective at all times to meet community needs.
(a)The board of supervisors may, by ordinance, resolution, or board order, authorize the county engineer, or other county officer, to order changes or additions in the work being performed under construction contracts. When so authorized, any change or addition in the work shall be ordered in writing by the county engineer, or other designated officer, and the extra cost to the county for any change or addition to the work so ordered shall not exceed five thousand dollars ($5,000) when the total amount of the original contract does not exceed fifty thousand dollars ($50,000), nor 10 percent of the amount of any original contract that exceeds fifty thousand dollars ($50,000), but does not exceed two hundred fifty thousand dollars ($250,000).
(b)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (c) and (d), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).
(c)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
(5)This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (b) of Section 20395, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6)If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d)The County of Santa Clara may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
(5)This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (c) of Section 20395 exceeds seven contracts.(6)If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(e)This section shall remain in effect only until January 1, 2027, and as of that date is repealed.SEC. 2.Section 20142 of the Public Contract Code, as added by Section 2 of Chapter 95 of the Statutes of 2021, is repealed.20142.(a)The board of supervisors may, by ordinance, resolution, or board order, authorize the county engineer, or other county officer, to order changes or additions in the work being performed under construction contracts. When so authorized, any change or addition in the work shall be ordered in writing by the county engineer, or other designated officer, and the extra cost to the county for any change or addition to the work so ordered shall not exceed five thousand dollars ($5,000) when the total amount of the original contract does not exceed fifty thousand dollars ($50,000), nor 10 percent of the amount of any original contract that exceeds fifty thousand dollars ($50,000), but does not exceed two hundred fifty thousand dollars ($250,000).(b)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). In no event shall any such change or alteration exceed two hundred ten thousand dollars ($210,000).(c)This section shall become operative on January 1, 2027.SEC. 3.Section 20395 of the Public Contract Code, as amended by Section 2 of Chapter 281 of the Statutes of 2023, is amended to read:20395.(a) In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board of supervisors may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to have any work upon county highways done under their supervision and direction. The work may be done in any of the following ways:
(1)By letting a contract covering both work and material. In that event, the contract shall be let to the lowest responsible bidder as provided in this article.
(2)By purchasing the material and letting a contract for the performance of the work. In that event, the material shall be bought at the lowest possible cost and the contract let to the lowest responsible bidder as provided in this article.
(3)By purchasing the material and having the work done by day labor, in which case advertising for bids is not required.
(4)(A)By authorizing the county road commissioner or a registered civil engineer under the direction of the county director of transportation to execute changes or additions to the work for any contract pursuant to this section in an amount not to exceed five thousand dollars ($5,000) for contracts of fifty thousand dollars ($50,000) or less, or 10 percent for contracts over fifty thousand dollars ($50,000) but not to exceed two hundred fifty thousand dollars ($250,000). In no event shall any change or addition to the work exceed a net total addition of twenty-five thousand dollars ($25,000).
(B)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivisions (b) and (c), no change or alteration shall exceed two hundred ten thousand dollars ($210,000).
(b)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
(5)This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (c) of Section 20142, subdivision (e) of Section 20405, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6)If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(c)The County of Santa Clara may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Santa Clara, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
(5)This subdivision does not apply if the sum of the contracts modified under this subdivision and subdivision (d) of Section 20142 exceeds seven contracts.(6)If a contract is modified under this subdivision, the County of Santa Clara shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(d)By purchasing the material and letting a contract for the work or by letting a contract covering both work and material without advertising for bids when the estimated cost of emergency work necessitated by the imminence or occurrence of a landslide, flood, storm damage, or other emergency exceeds twenty-five thousand dollars ($25,000) and the public interest and necessity demand immediate action to safeguard life, health, or property.
(e)This section shall remain in effect only until January 1, 2027, and as of that date is repealed.SEC. 4.Section 20395 of the Public Contract Code, as added by Section 4 of Chapter 95 of the Statutes of 2021, is repealed.20395.In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board of supervisors may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to have any work upon county highways done under their supervision and direction. The work may be done in any of the following ways:(a)By letting a contract covering both work and material. In that event, the contract shall be let to the lowest responsible bidder as provided in this article.(b)By purchasing the material and letting a contract for the performance of the work. In that event, the material shall be bought at the lowest possible cost and the contract let to the lowest responsible bidder as provided in this article.(c)By purchasing the material and having the work done by day labor, in which case advertising for bids is not required.(d)(1)By authorizing the county road commissioner or a registered civil engineer under the direction of the county director of transportation to execute changes or additions to the work for any contract pursuant to this section in an amount not to exceed five thousand dollars ($5,000) for contracts of fifty thousand dollars ($50,000) or less, or 10 percent for contracts over fifty thousand dollars ($50,000) but not to exceed two hundred fifty thousand dollars ($250,000). In no event shall any change or addition to the work exceed a net total addition of twenty-five thousand dollars ($25,000).(2)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the original contract cost in excess of two hundred fifty thousand dollars ($250,000). In no event shall any change or alteration exceed two hundred ten thousand dollars ($210,000).(e)By purchasing the material and letting a contract for the work or by letting a contract covering both work and material without advertising for bids when the estimated cost of emergency work necessitated by the imminence or occurrence of a landslide, flood, storm damage, or other emergency exceeds twenty-five thousand dollars ($25,000) and the public interest and necessity demand immediate action to safeguard life, health, or property.(f)This section shall become operative on January 1, 2027.SEC. 5.Section 20405 of the Public Contract Code, as amended by Section 5 of Chapter 95 of the Statutes of 2021, is amended to read:20405.(a)The board shall afford all bidders an opportunity to examine the plans, specifications, and working details, and shall award the contract to the lowest responsible bidder. The board may provide by resolution that the bids be opened, examined, and declared by an officer designated in the resolution. The resolution shall require that the bids be opened at a public meeting called by the officer and that the results of the bidding be reported to the board at a subsequent regular board meeting. The notice inviting bids shall state the time and place of the public meeting and the name of the designated officer.
(b)All bids for construction work shall be presented under sealed cover and shall be accompanied by one of the following forms of bidders security:
(1)Cash.
(2)A cashiers check made payable to the county.
(3)A certified check made payable to the county.
(4)A bidders bond executed by an admitted surety insurer, made payable to the county.
Upon an award to the lowest bidder, the security of an unsuccessful bidder shall be returned in a reasonable period of time, but in no event shall that security be held by the county beyond 60 days from the time the award is made.
(c)The person to whom the contract is awarded shall execute a bond, approved by the board, for the faithful performance of the contract. The person shall perform the work in accordance with the plans, specifications, and working details, unless all or any of them are modified by a four-fifths vote of the members of the board. In that case, if the cost of the work is reduced by reason of the modification, the person to whom the contract is awarded shall make an allowance on the contract price to the extent of the reduction.
(d)In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to execute changes or additions to the work for any contract made pursuant to this article in an amount not to exceed:
(1)For contracts whose original cost is less than fifty thousand dollars ($50,000), the amount of the change or addition shall not exceed five thousand dollars ($5,000).
(2)For contracts whose original cost is fifty thousand dollars ($50,000), but less than two hundred fifty thousand dollars ($250,000), the amount of the change or addition shall not exceed 10 percent of the amount of the cost of the original contract.
(3)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the cost of the original contract that is in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivision (e), no change or addition shall exceed two hundred ten thousand dollars ($210,000).
(e)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (d) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board delegates authority in the manner specified in subdivision (d) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
(5)This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (c) of Section 20142, subdivision (b) of Section 20395, subdivision (b) of Section 20614, and subdivision (b) of Section 20998, exceeds seven contracts.(6)If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(f)This section shall remain in effect only until January 1, 2027, and as of that date is repealed.SEC. 6.Section 20405 of the Public Contract Code, as added by Section 6 of Chapter 95 of the Statutes of 2021, is repealed.20405.(a)The board shall afford all bidders an opportunity to examine the plans, specifications, and working details, and shall award the contract to the lowest responsible bidder. The board may provide by resolution that the bids be opened, examined, and declared by an officer designated in the resolution. The resolution shall require that the bids be opened at a public meeting called by the officer and that the results of the bidding be reported to the board at a subsequent regular board meeting. The notice inviting bids shall state the time and place of the public meeting and the name of the designated officer.(b)All bids for construction work shall be presented under sealed cover and shall be accompanied by one of the following forms of bidders security:(1)Cash.(2)A cashiers check made payable to the county.(3)A certified check made payable to the county.(4)A bidders bond executed by an admitted surety insurer, made payable to the county.Upon an award to the lowest bidder, the security of an unsuccessful bidder shall be returned in a reasonable period of time, but in no event shall that security be held by the county beyond 60 days from the time the award is made.(c)The person to whom the contract is awarded shall execute a bond, approved by the board, for the faithful performance of the contract. The person shall perform the work in accordance with the plans, specifications, and working details, unless all or any of them are modified by a four-fifths vote of the members of the board. In that case, if the cost of the work is reduced by reason of the modification, the person to whom the contract is awarded shall make an allowance on the contract price to the extent of the reduction.(d)In any county that has appointed a road commissioner pursuant to Section 2006 of the Streets and Highways Code, or in any county that has abolished the office of road commissioner and complied with Section 2006.1 of the Streets and Highways Code, the board may authorize the road commissioner, or a registered civil engineer under the direction of the county director of transportation, to execute changes or additions to the work for any contract made pursuant to this article in an amount not to exceed:(1)For contracts whose original cost is less than fifty thousand dollars ($50,000), the amount of the change or addition shall not exceed five thousand dollars ($5,000).(2)For contracts whose original cost is fifty thousand dollars ($50,000), but less than two hundred fifty thousand dollars ($250,000), the amount of the change or addition shall not exceed 10 percent of the amount of the cost of the original contract.(3)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the cost of the original contract that is in excess of two hundred fifty thousand dollars ($250,000). In no event shall any change or addition exceed two hundred ten thousand dollars ($210,000).(e)This section shall become operative on January 1, 2027.SEC. 7.Section 20614 of the Public Contract Code, as amended by Section 7 of Chapter 95 of the Statutes of 2021, is amended to read:20614.(a) The board of supervisors and the board of directors of the district, if any, may, by ordinance, resolution, or board order, authorize the general manager or other district officer to order changes or additions in the work being performed under contracts made pursuant to this article in an amount not to exceed:
(1)For contracts whose original cost is less than fifty thousand dollars ($50,000), the amount of the change or addition shall not exceed five thousand dollars ($5,000).
(2)For contracts whose original cost is fifty thousand dollars ($50,000), but less than two hundred fifty thousand dollars ($250,000), the amount of the change or addition shall not exceed 10 percent of the amount of the cost of the original contract.
(3)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the cost of the original contract that is in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivision (b), no change or addition shall exceed two hundred ten thousand dollars ($210,000).
(b)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
(5)This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (c) of Section 20142, subdivision (b) of Section 20395, subdivision (e) of Section 20405, and subdivision (b) of Section 20998, exceeds seven contracts.(6)If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(c)This section shall remain in effect only until January 1, 2027, and as of that date is repealed.SEC. 8.Section 20614 of the Public Contract Code, as added by Section 8 of Chapter 95 of the Statutes of 2021, is repealed.20614.The board of supervisors and the board of directors of the district, if any, may, by ordinance, resolution, or board order, authorize the general manager or other district officer to order changes or additions in the work being performed under contracts made pursuant to this article in an amount not to exceed:(a)For contracts whose original cost is less than fifty thousand dollars ($50,000), the amount of the change or addition shall not exceed five thousand dollars ($5,000).(b)For contracts whose original cost is fifty thousand dollars ($50,000), but less than two hundred fifty thousand dollars ($250,000), the amount of the change or addition shall not exceed 10 percent of the amount of the cost of the original contract.(c)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition to the work so ordered shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the cost of the original contract that is in excess of two hundred fifty thousand dollars ($250,000). In no event shall any change or addition exceed two hundred ten thousand dollars ($210,000).(d)This section shall become operative on January 1, 2027.SEC. 9.Section 20998 of the Public Contract Code, as amended by Section 9 of Chapter 95 of the Statutes of 2021, is amended to read:20998.(a) The board of supervisors of the district may, by ordinance, resolution, or board order, authorize the chief engineer or other district officer to order changes or additions in the work being performed under contracts made pursuant to this article in an amount not to exceed:
(1)For contracts whose original cost is less than fifty thousand dollars ($50,000), the amount of the change or addition shall not exceed five thousand dollars ($5,000).
(2)For contracts whose original cost is fifty thousand dollars ($50,000), but less than two hundred fifty thousand dollars ($250,000), the amount of the change or addition shall not exceed 10 percent of the amount of the cost of the original contract.
(3)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the cost of the original contract that is in excess of two hundred fifty thousand dollars ($250,000). Notwithstanding subdivision (b), no change or addition shall exceed two hundred ten thousand dollars ($210,000).
(b)The County of Los Angeles may elect to be subject to all of the following provisions:
(1)For contracts whose original cost exceeds twenty-five million dollars ($25,000,000), the extra cost for any change or addition to the work so ordered shall not exceed four hundred thousand dollars ($400,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(2)For contracts whose original cost exceeds fifty million dollars ($50,000,000), the extra cost for any change or addition to the work so ordered shall not exceed seven hundred fifty thousand dollars ($750,000), adjusted annually to reflect the percentage change in the California Consumer Price Index.
(3)If the board of supervisors delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the decision by the county engineer or other county officer whom authority was delegated to shall be binding on the County of Los Angeles, and all existing protest and grievance procedures regarding that decision remain valid.
(4)At the time the board delegates authority in the manner specified in subdivision (a) with regard to the contract costs specified in this subdivision, the board shall implement appropriate measures to prevent fraud and ensure accountability for that delegated authority.
(5)This subdivision does not apply if the sum of the contracts modified under this subdivision, subdivision (c) of Section 20142, subdivision (b) of Section 20395, subdivision (e) of Section 20405, and subdivision (b) of Section 20614, exceeds seven contracts.(6)If a contract is modified under this subdivision, the County of Los Angeles shall provide a review report to the Assembly Committee on Local Government and the Senate Committee on Governance and Finance no later than July 1, 2026.(c)This section shall remain in effect only until January 1, 2027, and as of that date is repealed.SEC. 10.Section 20998 of the Public Contract Code, as added by Section 10 of Chapter 95 of the Statutes of 2021, is repealed.20998.The board of supervisors of the district may, by ordinance, resolution, or board order, authorize the chief engineer or other district officer to order changes or additions in the work being performed under contracts made pursuant to this article in an amount not to exceed:(a)For contracts whose original cost is less than fifty thousand dollars ($50,000), the amount of the change or addition shall not exceed five thousand dollars ($5,000).(b)For contracts whose original cost is fifty thousand dollars ($50,000), but less than two hundred fifty thousand dollars ($250,000), the amount of the change or addition shall not exceed 10 percent of the amount of the cost of the original contract.(c)For contracts whose original cost exceeds two hundred fifty thousand dollars ($250,000), the extra cost for any change or addition shall not exceed twenty-five thousand dollars ($25,000), plus 5 percent of the amount of the cost of the original contract that is in excess of two hundred fifty thousand dollars ($250,000). In no event shall any change or addition exceed two hundred ten thousand dollars ($210,000).(d)This section shall become operative on January 1, 2027.SEC. 11.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need for flexibility given the contract costs and schedule constraints of public contracts within the County of Santa Clara.
SEC. 12.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the following unique needs of the County of Los Angeles:
(a)Spanning over 4,000 square miles, the County of Los Angeles is the most populous county in the United States.
(b)With a population of nearly 10 million residents, the County of Los Angeles surpasses all other counties in the United States in terms of population and encompasses more than a quarter of Californias population.
(c)Given the sheer size of its population and the vast infrastructure for critical public services delivery, it is important to ensure that Los Angeles County facilities remain operational and effective at all times to meet community needs.
|
Date
|
Status
|
|---|---|
| Jun 30, 2026 | Chaptered by Secretary of State - Chapter 41, Statutes of 2026. |
| Jun 30, 2026 | Approved by the Governor. |
| Jun 24, 2026 | Enrolled and presented to the Governor at 11:30 a.m. |
| Jun 18, 2026 | In Assembly. Ordered to Engrossing and Enrolling. |
| Jun 18, 2026 | Read third time. Passed. Ordered to the Assembly. (Ayes 37. Noes 0. Page 4859.). |
| Jun 18, 2026 | Read third time. Passed. Ordered to the Assembly. (Ayes 37. Noes 0.). |
| Jun 11, 2026 | Read second time. Ordered to Consent Calendar. |
| Jun 10, 2026 | From committee: Do pass. To Consent Calendar. (Ayes 7. Noes 0.) (June 10). |
| May 20, 2026 | Referred to Com. on L. GOV. |
| May 12, 2026 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 11, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 70. Noes 2. Page 4993.) |
| May 11, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 70. Noes 2.) |
| May 11, 2026 | Read third time. Passed. Ordered to the Senate. |
| May 4, 2026 | Read second time. Ordered to third reading. |
| Apr 30, 2026 | From committee: Do pass. (Ayes 10. Noes 0.) (April 29). |
| Feb 17, 2026 | Referred to Com. on L. GOV. |
| Jan 30, 2026 | From printer. May be heard in committee March 1. |
| Jan 29, 2026 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Jun 18, 2026 | Consent Calendar 2nd AB1658 Kalra | Senate Floor |
Passed |
|
| Jun 10, 2026 | Do pass and be ordered to the Consent Calendar | Senate Standing Committee on Local Government |
Passed |
|
| May 11, 2026 | AB 1658 Kalra Assembly Third Reading | Assembly Floor |
Passed |
|
| Apr 29, 2026 | Do pass. | Assembly Standing Committee on Local Government |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| County of Santa Clara | ** Support | |
| Los Angeles County | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | AB 1658 |
CONSENT
Bill No: AB 1658
Author: Kalra (D)
Introduced: 1/29/26
Vote: 21
SENATE LOCAL GOVERNMENT COMMITTEE: 7-0, 6/10/26
AYES: Durazo, Choi, Arreguín, Ashby, Cervantes, Laird, Seyarto
ASSEMBLY FLOOR: 70-2, 5/11/26 - See last page for vote
SUBJECT: Local Agency Public Construction Act: change orders: County of Los Angeles: County of Santa Clara
SOURCE: Santa Clara County
DIGEST:
This bill repeals the sunset date and cap on the number of eligible projects for the Counties of Los Angeles and Santa Clara to use higher change order limits for specified contracts.
ANALYSIS:
Existing law:
- Requires, pursuant to the Local Agency Public Construction Act (LAPC Act), local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder under the traditional design-bid-build project delivery system
- Allows a county board of supervisors or a local governing board to approve change orders in construction contracts by a 4/5 vote,
- A board may delegate authority to a county engineer or other officer, with the limits:
- For contracts up to $50,000, a change order may not exceed $5,000.
- For contracts exceeding $50,000, but not exceeding $250,000, the change order is limited to 10% of the contract.
- For contracts over $250,000, the change order cannot exceed $25,000, plus 5% of the amount of the original contract cost above $250,000, with a total cap of $210,000.
- Allows the County of Los Angeles (LA County) and Santa Clara County delegated change order authority limits for specific projects, as specified:
- For contracts exceeding $25 million, increased the delegated change order cap to $400,000 with an annual Consumer Price Index (CPI) adjustment;
- For contracts exceeding $50 million, increased the delegated change order cap to $750,000, with an annual CPI adjustment;
- Limits the delegated authority to seven projects;
- Requires a report to the appropriate Legislative committees; and
- Sunsets January 1, 2027.
- For contracts exceeding $25 million, increased the delegated change order cap to $400,000 with an annual Consumer Price Index (CPI) adjustment;
- A board may delegate authority to a county engineer or other officer, with the limits:
This bill:
- Removes the cap on the total number of contracts, which is seven under existing law, for which LA County and Santa Clara County may use higher change order limits.
- Removes a requirement that LA County and Santa Clara County provide reports to the Assembly Local Government Committee and the Senate Governance and Finance Committee if they elect to utilize higher change order limits.
- Removes the sunset date of January 1, 2027, on existing law that authorizes LA County and Santa Clara County to utilize higher change order limits.
Background
County of Los Angeles. The County of Los Angeles (LA County) provides a range of services to its over 10 million residents, including county highways, bridges, subways, water, and flood control. To provide these services, LA County must construct and maintain many kinds of public infrastructure. In 2021, the Legislature approved AB 712 (Calderon, Chapter 95, Statutes of 2021), which granted LA County an increase in delegated authority limits for specified contracts. AB 712 increased the caps on contracts generally, and for construction contracts on county highways, bridges, and subways, as well as construction by the county’s waterworks district and flood control district. Specifically:
- For contracts exceeding $25 million, AB 712 increased the delegated change order cap to $400,000 with an annual Consumer Price Index (CPI) adjustment; and
- For contracts exceeding $50 million, AB 712 increased the delegated change order cap to $750,000, with an annual CPI adjustment.
AB 712 also provided that if the board of supervisors delegates authority for these change orders, the decision by the county engineer or other county officer is binding on the county, and all existing protest and grievance procedures regarding that decision remain valid. LA County must implement appropriate measures to prevent fraud and ensure accountability for this delegated authority. The bill limited the delegated authority to a total of seven contracts and required the County to provide a report to the appropriate committees if it utilized the provisions of the bill. AB 712 sunsets on January 1, 2027.
According to LA County, it has exercised this authority on five projects. Those projects include: Adventure Park Multi-Benefit Stormwater Capture Project, Pacoima Spreading Grounds Basin Enhancement Project, Harbor-UCLA Medical Center Replacement Program, North Hollywood Health Center, and Los Angeles General Psychiatric Subacute Facility. In its report to the Legislature, LA County states, “Use of this authority has avoided significant administrative costs, reduced exposure to schedule delays, and generated documented cost avoidance exceeding $40 million, including the prevention of approximately 12 months of delay on the Harbor-UCLA Medical Center Replacement Program.”
Santa Clara County. Following the passage of AB 712 in 2021, the Legislature approved AB 1649 (Kalra, 2023), which extended nearly the same authority to Santa Clara County that the Legislature granted to LA County.
According to the report from Santa Clara County, “…the County of Santa Clara has used the higher-level authority on one project and plans to use it on some other existing projects before the existing legislation sunsets. The one project where the authority has been used is the following: The Child & Adolescent Psychiatric Facility/Behavioral Health Services Center…This authority resulted in saving staff time and cost to develop and process items on the Board agenda for three separate Board actions. In addition, the authority minimized project schedule delays and mitigated extended general conditions costs.” Santa Clara reports the following projects will meet or exceed the change order threshold: Santa Clara Valley Medical Center seismic upgrade, O’Connor Hospital seismic upgrade, and Regional Medical Center Operating Suite Remodel.
Comments
According to the author, “AB 1658 will provide Santa Clara County and Los Angeles County with expedited ability to avoid construction delays in complex projects, such as the replacement of the Harbor-UCLA hospital in Los Angeles County, where the authority has allowed the project to avoid approximately 12 months of delay, or the Behavioral Health Services Center on the campus of Santa Clara Valley Medical Center, where the County has avoided approximately 20 months of delay in constructing an inpatient/outpatient center for child and adolescent psychiatric and behavioral health care.”
Ch-Ch-Changes. AB 712 and AB 1649 (Kalra, Chapter 281, Statutes of 2023) raised the delegated change order limits for Los Angeles and Santa Clara Counties for specified construction and highway projects. According to these counties, this authority has reduced administrative costs and project delays, helping keep projects on schedule. The Legislature originally granted the authority based on the size and complexity of these counties’ public works construction projects. However, other local agencies also manage large and increasingly complex public works projects and may face similar challenges when responding to unforeseen conditions that result in change orders. If higher change order limits improve project delivery and reduce administrative costs, the Legislature may wish to raise the existing statewide threshold to reflect the rising costs of construction.
Safeguards. When LA County previously sought legislative authorization to increase the dollar threshold for change orders, the Legislature approved the ask with several safeguards, including: a limit on the number of projects eligible for the authority, provisions specifying that the county’s protest and grievance processes still apply, a sunset date, and reporting requirements to the appropriate legislative committees if the authority was used. When the Legislature extended the same authority to Santa Clara County, it retained the same safeguards. In the intervening years, there have been no reports of any misdeeds using the higher delegated authority threshold. This bill repeals the sunsets, the project cap, and reporting requirements, but maintains the requirement that the county’s protest and grievance processes apply. This ensures that public dollars continue to be spent appropriately.
Special legislation. The California Constitution prohibits special legislation when a general law can apply (Article IV, §16). This bill contains findings and declarations explaining the need for legislation that applies to the unique need for flexibility given the contract costs of public contracts within Santa Clara and Los Angeles Counties.
FISCAL EFFECT: Appropriation: No Fiscal Com.: No Local: No
SUPPORT: (Verified 6/12/26)
County of Santa Clara (Source)
Los Angeles County
OPPOSITION: (Verified 6/12/26)
None received
ASSEMBLY FLOOR: 70-2, 5/11/26
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Castillo, Chen, Connolly, Davies, Dixon, Elhawary, Ellis, Flora, Fong, Gabriel, Gallagher, Garcia, Gipson, Jeff Gonzalez, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Johnson, Kalra, Krell, Lackey, Lee, Macedo, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Pellerin, Petrie-Norris, Ramos, Ransom, Rogers, Blanca Rubio, Sanchez, Schiavo, Schultz, Sharp-Collins, Stefani, Ta, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NOES: DeMaio, Tangipa
NO VOTE RECORDED: Arambula, Lowenthal, Patterson, Quirk-Silva, Celeste Rodriguez, Michelle Rodriguez, Solache, Soria
Prepared by: Itzel Vargas / L. GOV. / (916) 651-4119
6/12/26 12:50:02
**** END ****
SENATE COMMITTEE ON LOCAL GOVERNMENT
Senator María Elena Durazo, Chair
2025 - 2026 Regular
Bill No: | AB 1658 | Hearing Date: | 6/10/26 |
Author: | Kalra | Fiscal: | No |
Version: | 1/29/26 | Consultant: | Vargas |
Local Agency Public Construction Act: change orders: County of Los Angeles: County of Santa Clara
Repeals the sunset date and cap on the number of eligible projects for the Counties of Los Angeles and Santa Clara to use higher change order limits for specified contracts.
Background
Contracting. The Local Agency Public Construction Act requires local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder. This design-bid-build method is the traditional, and most widely-used, approach to public works construction. This approach splits construction projects into two distinct phases: design and construction. During the design phase, the local agency prepares detailed project plans and specifications using its own employees or by hiring outside architects and engineers. Once project designs are complete, local officials invite bids from the construction industry and award the contract to the lowest responsible bidder.
Change orders. Change orders are amendments to a construction contract that changes the contractor’s scope of work, such as moving the location of a wall to accommodate some other design element. The Local Agency Public Construction Act allows a county board of supervisors or a local governing board to approve change orders in construction contracts by a 4/5 vote. This applies to construction contracts generally and to construction contracts for specific projects such as county highways, county bridges and subways, county waterworks districts, and county flood control districts, among others. However, a board may delegate authority to order and approve change orders to a county engineer or other officer, avoiding the necessity of board approval up to certain limits. The Legislature last updated these limits in 2011 (SB 194, Committee on Governance and Finance) as follows:
- For contracts up to $50,000, a change order may not exceed $5,000;
- For contracts between $50,000 and $250,000, a change order may not exceed 10% of the contract; and
- For contracts over $250,000, a change order cannot exceed $25,000, plus 5% of the amount of the original contract cost above $250,000, with a total cap of $210,000.
County of Los Angeles. The County of Los Angeles (LA County) provides a range of services to its over 10 million residents, including county highways, bridges, subways, water, and flood control. To provide these services, LA County must construct and maintain many kinds of public infrastructure. In 2021, the Legislature approved AB 712 (Calderon), which granted LA County an increase in delegated authority limits for specified contracts. AB 712 increased the caps on contracts generally, and for construction contracts on county highways, bridges, and subways, as well as construction by the county’s waterworks district and flood control district. Specifically:
- For contracts exceeding $25 million, AB 712 increased the delegated change order cap to $400,000 with an annual Consumer Price Index (CPI) adjustment; and
- For contracts exceeding $50 million, AB 712 increased the delegated change order cap to $750,000, with an annual CPI adjustment.
AB 712 also provided that if the board of supervisors delegates authority for these change orders, the decision by the county engineer or other county officer is binding on the county, and all existing protest and grievance procedures regarding that decision remain valid. LA County must implement appropriate measures to prevent fraud and ensure accountability for this delegated authority. The bill limited the delegated authority to a total of seven contracts and required the County to provide a report to the appropriate committees if it utilized the provisions of the bill. AB 712 sunsets on January 1, 2027.
According to LA County, it has exercised this authority on five projects. Those projects include: Adventure Park Multi-Benefit Stormwater Capture Project, Pacoima Spreading Grounds Basin Enhancement Project, Harbor-UCLA Medical Center Replacement Program, North Hollywood Health Center, and Los Angeles General Psychiatric Subacute Facility. In its report to the Legislature, LA County states, “Use of this authority has avoided significant administrative costs, reduced exposure to schedule delays, and generated documented cost avoidance exceeding $40 million, including the prevention of approximately 12 months of delay on the Harbor-UCLA Medical Center Replacement Program.”
Santa Clara County. Following the passage of AB 712 in 2021, the Legislature approved AB 1649 (Kalra, 2023), which extended nearly the same authority to Santa Clara County that the Legislature granted to LA County.
According to the report from Santa Clara County, “…the County of Santa Clara has used the higher-level authority on one project and plans to use it on some other existing projects before the existing legislation sunsets. The one project where the authority has been used is the following: The Child & Adolescent Psychiatric Facility/Behavioral Health Services Center…This authority resulted in saving staff time and cost to develop and process items on the Board agenda for three separate Board actions. In addition, the authority minimized project schedule delays and mitigated extended general conditions costs.” Santa Clara reports the following projects will meet or exceed the change order threshold: Santa Clara Valley Medical Center seismic upgrade, O’Connor Hospital seismic upgrade, and Regional Medical Center Operating Suite Remodel.
Based on both counties’ reports of positive outcomes, Santa Clara County wants the Legislature to make the change order delegated authority permanent.
Proposed Law
Assembly Bill 1658 repeals the seven-project cap on the number of contracts for which the Counties of Los Angeles and Santa Clara may delegate authority using the higher change order limits.
The bill also repeals the requirements for the Counties of Los Angeles and Santa Clara to report on their use of the higher change order limits by July 1, 2026.
AB 1658 repeals the January 1, 2027, sunset on the higher limits for the Counties of Los Angeles and Santa Clara to delegate the authority to approve change orders.
Comments
1. Purpose of the bill. According to the author, “AB 1658 will provide Santa Clara County and Los Angeles County with expedited ability to avoid construction delays in complex projects, such as the replacement of the Harbor-UCLA hospital in Los Angeles County, where the authority has allowed the project to avoid approximately 12 months of delay, or the Behavioral Health Services Center on the campus of Santa Clara Valley Medical Center, where the County has avoided approximately 20 months of delay in constructing an inpatient/outpatient center for child and adolescent psychiatric and behavioral health care.”
2. Ch-Ch-Changes. AB 712 and AB 1649 raised the delegated change order limits for Los Angeles and Santa Clara Counties for specified construction and highway projects. According to these counties, this authority has reduced administrative costs and project delays, helping keep projects on schedule. The Legislature originally granted the authority based on the size and complexity of these counties’ public works construction projects. However, other local agencies also manage large and increasingly complex public works projects and may face similar challenges when responding to unforeseen conditions that result in change orders. If higher change order limits improve project delivery and reduce administrative costs, the Legislature may wish to raise the existing statewide threshold to reflect the rising costs of construction.
3. Safeguards. When LA County previously sought legislative authorization to increase the dollar threshold for change orders, the Legislature approved the ask with several safeguards, including: a limit on the number of projects eligible for the authority, provisions specifying that the county’s protest and grievance processes still apply, a sunset date, and reporting requirements to the appropriate legislative committees if the authority was used. When the Legislature extended the same authority to Santa Clara County, it retained the same safeguards. In the intervening years, there have been no reports of any misdeeds using the higher delegated authority threshold. AB 1658 repeals the sunsets, the project cap, and reporting requirements, but maintains the requirement that the county’s protest and grievance processes apply. This ensures that public dollars continue to be spent appropriately.
4. Special legislation. The California Constitution prohibits special legislation when a general law can apply (Article IV, §16). AB 1658 contains findings and declarations explaining the need for legislation that applies to the unique need for flexibility given the contract costs of public contracts within Santa Clara and Los Angeles Counties.
Assembly Actions
Assembly Local Government Committee: 10-0
Assembly Floor: 70-2
Support and Opposition
(6/5/2026)
Support: County of Santa Clara (Sponsor)
Los Angeles County
Opposition: None Submitted
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 1658
Author:(Kalra)
As Introduced Ver:January 29, 2026
Majority vote
SUMMARY
Makes permanent the authorizations for the County of Los Angeles (LA County) and the County of Santa Clara (Santa Clara County) to use higher change order limits for specified contracts.
Major Provisions
- Removes the cap on the total number of contracts, which is seven under existing law, for which LA County and Santa Clara County may use higher change order limits.
- Removes a requirement that LA County and Santa Clara County provide reports to the Assembly Local Government Committee and the Senate Governance and Finance Committee if they elect to utilize higher change order limits.
- Removes the sunset date of January 1, 2027, on existing law that authorizes LA County and Santa Clara County to utilize higher change order limits.
COMMENTS
- Delegated Authority for Change Orders. Change orders are amendments to a construction contract that change the contractor's scope of work, such as moving the location of a wall to accommodate some other design element or making adjustments for unforeseen conditions. This, in turn, changes the contract cost – typically increasing it.
The Local Agency Public Construction Act allows a county board of supervisors or a local governing board to approve change orders in construction contracts by a 4/5 vote. This applies to construction contracts generally and to construction contracts for specified projects, such as county highways, county bridges and subways, and other works.
However, a board may delegate authority to a county engineer or other officer to order and approve change orders, thereby avoiding the necessity of board approval. This delegated authority is generally limited as follows:
- For contracts up to $50,000, a change order may not exceed $5,000.
- For contracts exceeding $50,000, but not exceeding $250,000, the change order is limited to 10% of the contract.
- For contracts over $250,000, the change order cannot exceed $25,000, plus 5% of the amount of the original contract cost above $250,000, with a total cap of $210,000.
- Delegated Authority Limits for LA County. The Legislature approved AB 712 (Calderon), Chapter 95, Statutes of 2021, to increase the delegated authority limits noted above for specified contracts entered into by LA County. The bill increased these caps for contracts generally, and for construction contracts on county highways, bridges, subways, and those entered into by the county's waterworks district and flood control district.
For contracts exceeding $25 million, the delegated change order cap was increased to $400,000, with an annual CPI adjustment. For contracts exceeding $50 million, the delegated change order cap was increased to $750,000, with an annual CPI adjustment. The bill provided that, if the board of supervisors delegates authority for these change orders, the decision by the county engineer or other county officer is binding on LA County, and all existing protest and grievance procedures regarding that decision remain valid. The board must implement appropriate measures to prevent fraud and ensure accountability for this delegated authority.
AB 712 was limited to a total of seven contracts and required LA County to provide a report to the Assembly Local Government Committee and the Senate Governance and Finance Committee no later than July 1, 2026, if it elects to utilize the provisions of the bill. AB 712 contained a sunset date of January 1, 2027.
- Delegated Authority Limits for Santa Clara County. Following closely on the heels of AB 712, the Legislature approved AB 1649 (Kalra), Chapter 281, Statutes of 2023. AB 1649 extended to Santa Clara County nearly the same delegated authority that was granted to LA County via AB 712.
- Reports From the Counties. Both Santa Clara County and LA County have submitted their reports to the Legislature that were required by AB 712 and AB 1649.
According to the report submitted by Santa Clara County, "Since the higher delegated change order limits for a select number of projects became effective for the County of Santa Clara on January 1, 2024, the County of Santa Clara has used the higher-level authority on one project and plans to use it on some other existing projects before the existing legislation sunsets. The one project where the authority has been used…resulted in saving staff time and cost to develop and process items on the Board agenda for three separate Board actions. In addition, the authority minimized project schedule delays and mitigated extended general conditions costs."
According to the report submitted by LA County, "Since approval of the higher delegated change order authority effective January 1, 2022, Los Angeles County Public Works has utilized the expanded authority on five projects to date, though two of these projects are still in early stages of construction…The temporary delegated authority authorized by AB 712 has clearly demonstrated its value. Across the five projects listed above, this authority has been utilized for approval of 24 change orders under the expanded delegation that would otherwise have required separate Board actions. Use of this authority has avoided significant administrative costs, reduced exposure to schedule delays, and generated documented cost avoidance exceeding $40 million, including the prevention of approximately 12 months of delay on the Harbor-UCLA Medical Center Replacement Program."
"These benefits extend beyond administrative efficiency. The authority has supported timely delivery of critical public facilities, including hospitals, water infrastructure, stormwater capture projects, and other capital investments that directly affect public health, safety, environmental protection, and community resilience. In several cases, the authority has also reduced the County's exposure to regulatory risk and potential financial penalties. Since approval of this legislation, more than 40 County projects would have qualified for the expanded delegated authority absent the 7-project cap; accordingly, Public Works reserved the remaining two project authorizations allowed under AB 712 for future eligible projects."
According to the Author
AB 1658 will provide Santa Clara County and Los Angeles County with expedited ability to avoid construction delays in complex projects, such as the replacement of the Harbor-UCLA hospital in Los Angeles County, where the authority has allowed the project to avoid approximately 12 months of delay, or the Behavioral Health Services Center on the campus of Santa Clara Valley Medical Center, where the County has avoided approximately 20 months of delay in constructing an inpatient/outpatient center for child and adolescent psychiatric and behavioral health care.
Arguments in Support
The County of Santa Clara, sponsor of this bill, writes, "Change orders are amendments to a construction contract that change the contractor's scope of work, including moving a drainpipe or a wall. Often, these changes cannot reasonably be identified prior to excavation and are caught only after installation has begun. Under California law, the Local Agency Public Construction Act allows a Board of Supervisors to approve change orders with a two-thirds vote and delegate a designated officer to execute change orders on behalf of the Board below certain monetary limits. The maximum allowable delegation limits have not been updated for counties since 2011, and they do not reflect the significant rise in inflation and construction costs. This causes delays in approval, which lengthen construction time and increase costs to taxpayers."
"In 2021 and 2023, the Legislature authorized the Counties of Los Angeles and Santa Clara, respectively, to increase the maximum allowable delegation amount for up to seven projects and:
- For contracts $25-$50 million, the change order must not exceed $400,000, adjusted annually to reflect the percentage change in the California Consumer Price Index.
- For contracts over $50 million, the change order must not exceed $750,000, adjusted annually to reflect the percentage change in the California Consumer Price Index."
"Since the authority was approved, the County has used it during construction of a new Behavioral Health Services Center (BHSC) at one of our hospitals, Valley Medical Center. This building is over 200,000 square feet and holds a 77-bed acute psychiatric hospital for children, adolescents, and adults, a 56-bed Emergency Psychiatric Facility, a Mental Health Urgent Care Facility, and other areas. The contract change order authority was used nearly 60 times on the project, helping the County save 20 months of time during construction.
"AB 1658 would make permanent these updates to the Local Agency Public Construction Act for the Counties of Los Angeles and Santa Clara related to change orders. The authority works – the ability to administratively execute change orders has reduced construction delays and saved critical public dollars. At a time where counties are facing budget deficits, particularly due to the devastating funding cuts of H.R. 1, it is critical that construction projects stay as close to on-time as possible to avoid costly delays."
Arguments in Opposition
None on file.
FISCAL COMMENTS
None
VOTES
ASM LOCAL GOVERNMENT: 10-0-0
YES: Carrillo, Ta, Johnson, Pacheco, Ramos, Ransom, Blanca Rubio, Caloza, Ward, Wilson
UPDATED
VERSION: January 29, 2026
CONSULTANT: Angela Mapp / L. GOV. / (916) 319-3958 FN: 0002467
ASSEMBLY THIRD READING
ATR Bill Id:AB 1658
Author:(Kalra)
As Introduced Ver:January 29, 2026
Majority vote
SUMMARY
Makes permanent the authorizations for the County of Los Angeles (LA County) and the County of Santa Clara (Santa Clara County) to use higher change order limits for specified contracts.
Major Provisions
- Removes the cap on the total number of contracts, which is seven under existing law, for which LA County and Santa Clara County may use higher change order limits.
- Removes a requirement that LA County and Santa Clara County provide reports to the Assembly Local Government Committee and the Senate Governance and Finance Committee if they elect to utilize higher change order limits.
- Removes the sunset date of January 1, 2027, on existing law that authorizes LA County and Santa Clara County to utilize higher change order limits.
COMMENTS
- Delegated Authority for Change Orders. Change orders are amendments to a construction contract that change the contractor’s scope of work, such as moving the location of a wall to accommodate some other design element or making adjustments for unforeseen conditions. This, in turn, changes the contract cost – typically increasing it.
The Local Agency Public Construction Act allows a county board of supervisors or a local governing board to approve change orders in construction contracts by a 4/5 vote. This applies to construction contracts generally and to construction contracts for specified projects, such as county highways, county bridges and subways, and other works.
However, a board may delegate authority to a county engineer or other officer to order and approve change orders, thereby avoiding the necessity of board approval. This delegated authority is generally limited as follows:
- For contracts up to $50,000, a change order may not exceed $5,000.
- For contracts exceeding $50,000, but not exceeding $250,000, the change order is limited to 10% of the contract.
- For contracts over $250,000, the change order cannot exceed $25,000, plus 5% of the amount of the original contract cost above $250,000, with a total cap of $210,000.
- Delegated Authority Limits for LA County. The Legislature approved AB 712 (Calderon), Chapter 95, Statutes of 2021, to increase the delegated authority limits noted above for specified contracts entered into by LA County. The bill increased these caps for contracts generally, and for construction contracts on county highways, bridges, subways, and those entered into by the county’s waterworks district and flood control district.
For contracts exceeding $25 million, the delegated change order cap was increased to $400,000, with an annual CPI adjustment. For contracts exceeding $50 million, the delegated change order cap was increased to $750,000, with an annual CPI adjustment. The bill provided that, if the board of supervisors delegates authority for these change orders, the decision by the county engineer or other county officer is binding on LA County, and all existing protest and grievance procedures regarding that decision remain valid. The board must implement appropriate measures to prevent fraud and ensure accountability for this delegated authority.
AB 712 was limited to a total of seven contracts and required LA County to provide a report to the Assembly Local Government Committee and the Senate Governance and Finance Committee no later than July 1, 2026, if it elects to utilize the provisions of the bill. AB 712 contained a sunset date of January 1, 2027.
- Delegated Authority Limits for Santa Clara County. Following closely on the heels of AB 712, the Legislature approved AB 1649 (Kalra), Chapter 281, Statutes of 2023. AB 1649 extended to Santa Clara County nearly the same delegated authority that was granted to LA County via AB 712.
- Reports From the Counties. Both Santa Clara County and LA County have submitted their reports to the Legislature that were required by AB 712 and AB 1649.
According to the report submitted by Santa Clara County, “Since the higher delegated change order limits for a select number of projects became effective for the County of Santa Clara on January 1, 2024, the County of Santa Clara has used the higher-level authority on one project and plans to use it on some other existing projects before the existing legislation sunsets. The one project where the authority has been used…resulted in saving staff time and cost to develop and process items on the Board agenda for three separate Board actions. In addition, the authority minimized project schedule delays and mitigated extended general conditions costs.”
According to the report submitted by LA County, “Since approval of the higher delegated change order authority effective January 1, 2022, Los Angeles County Public Works has utilized the expanded authority on five projects to date, though two of these projects are still in early stages of construction…The temporary delegated authority authorized by AB 712 has clearly demonstrated its value. Across the five projects listed above, this authority has been utilized for approval of 24 change orders under the expanded delegation that would otherwise have required separate Board actions. Use of this authority has avoided significant administrative costs, reduced exposure to schedule delays, and generated documented cost avoidance exceeding $40 million, including the prevention of approximately 12 months of delay on the Harbor-UCLA Medical Center Replacement Program.
“These benefits extend beyond administrative efficiency. The authority has supported timely delivery of critical public facilities, including hospitals, water infrastructure, stormwater capture projects, and other capital investments that directly affect public health, safety, environmental protection, and community resilience. In several cases, the authority has also reduced the County’s exposure to regulatory risk and potential financial penalties. Since approval of this legislation, more than 40 County projects would have qualified for the expanded delegated authority absent the 7-project cap; accordingly, Public Works reserved the remaining two project authorizations allowed under AB 712 for future eligible projects.”
According to the Author
AB 1658 will provide Santa Clara County and Los Angeles County with expedited ability to avoid construction delays in complex projects, such as the replacement of the Harbor-UCLA hospital in Los Angeles County, where the authority has allowed the project to avoid approximately 12 months of delay, or the Behavioral Health Services Center on the campus of Santa Clara Valley Medical Center, where the County has avoided approximately 20 months of delay in constructing an inpatient/outpatient center for child and adolescent psychiatric and behavioral health care.
Arguments in Support
The County of Santa Clara, sponsor of this bill, writes, “Change orders are amendments to a construction contract that change the contractor’s scope of work, including moving a drainpipe or a wall. Often, these changes cannot reasonably be identified prior to excavation and are caught only after installation has begun. Under California law, the Local Agency Public Construction Act allows a Board of Supervisors to approve change orders with a two-thirds vote and delegate a designated officer to execute change orders on behalf of the Board below certain monetary limits. The maximum allowable delegation limits have not been updated for counties since 2011, and they do not reflect the significant rise in inflation and construction costs. This causes delays in approval, which lengthen construction time and increase costs to taxpayers.
“In 2021 and 2023, the Legislature authorized the Counties of Los Angeles and Santa Clara, respectively, to increase the maximum allowable delegation amount for up to seven projects and:
- For contracts $25-$50 million, the change order must not exceed $400,000, adjusted annually to reflect the percentage change in the California Consumer Price Index.
- For contracts over $50 million, the change order must not exceed $750,000, adjusted annually to reflect the percentage change in the California Consumer Price Index.
“Since the authority was approved, the County has used it during construction of a new Behavioral Health Services Center (BHSC) at one of our hospitals, Valley Medical Center. This building is over 200,000 square feet and holds a 77-bed acute psychiatric hospital for children, adolescents, and adults, a 56-bed Emergency Psychiatric Facility, a Mental Health Urgent Care Facility, and other areas. The contract change order authority was used nearly 60 times on the project, helping the County save 20 months of time during construction.
“AB 1658 would make permanent these updates to the Local Agency Public Construction Act for the Counties of Los Angeles and Santa Clara related to change orders. The authority works – the ability to administratively execute change orders has reduced construction delays and saved critical public dollars. At a time where counties are facing budget deficits, particularly due to the devastating funding cuts of H.R. 1, it is critical that construction projects stay as close to on-time as possible to avoid costly delays.”
Arguments in Opposition
None on file.
FISCAL COMMENTS
None
VOTES
ASM LOCAL GOVERNMENT: 10-0-0
YES: Carrillo, Ta, Johnson, Pacheco, Ramos, Ransom, Blanca Rubio, Caloza, Ward, Wilson
UPDATED
VERSION: January 29, 2026
CONSULTANT: Angela Mapp / L. GOV. / (916) 319-3958 FN:
Date of Hearing: April 29, 2026
ASSEMBLY COMMITTEE ON LOCAL GOVERNMENT
Juan Carrillo, Chair
ABPCA Bill Id:AB 1658 (
Author:Kalra) – As Introduced Ver:January 29, 2026
SUBJECT: Local Agency Public Construction Act: change orders: County of Los Angeles: County of Santa Clara
SUMMARY: Makes permanent the authorizations for the County of Los Angeles (LA County) and the County of Santa Clara (Santa Clara County) to use higher change order limits for specified contracts. Specifically, this bill:
- Removes the cap on the total number of contracts, which is seven under existing law, for which LA County and Santa Clara County may use higher change order limits.
- Removes a requirement that LA County and Santa Clara County provide reports to the Assembly Local Government Committee and the Senate Governance and Finance Committee if they elect to utilize higher change order limits.
- Removes the sunset date of January 1, 2027, on existing law that authorizes LA County and Santa Clara County to utilize higher change order limits.
FISCAL EFFECT: None
COMMENTS:
- Author’s Statement. According to the author, “AB 1658 will provide Santa Clara County and Los Angeles County with expedited ability to avoid construction delays in complex projects, such as the replacement of the Harbor-UCLA hospital in Los Angeles County, where the authority has allowed the project to avoid approximately 12 months of delay, or the Behavioral Health Services Center on the campus of Santa Clara Valley Medical Center, where the County has avoided approximately 20 months of delay in constructing an inpatient/outpatient center for child and adolescent psychiatric and behavioral health care.”
- Delegated Authority for Change Orders. Change orders are amendments to a construction contract that change the contractor’s scope of work, such as moving the location of a wall to accommodate some other design element or making adjustments for unforeseen conditions. This, in turn, changes the contract cost – typically increasing it.
The Local Agency Public Construction Act allows a county board of supervisors or a local governing board to approve change orders in construction contracts by a 4/5 vote. This applies to construction contracts generally and to construction contracts for specified projects, such as county highways, county bridges and subways, and other works.
However, a board may delegate authority to a county engineer or other officer to order and approve change orders, thereby avoiding the necessity of board approval. This delegated authority is generally limited as follows:
- For contracts up to $50,000, a change order may not exceed $5,000.
- For contracts exceeding $50,000, but not exceeding $250,000, the change order is limited to 10% of the contract.
- For contracts over $250,000, the change order cannot exceed $25,000, plus 5% of the amount of the original contract cost above $250,000, with a total cap of $210,000.
- Delegated Authority Limits for LA County. The Legislature approved AB 712 (Calderon), Chapter 95, Statutes of 2021, to increase the delegated authority limits noted above for specified contracts entered into by LA County. The bill increased these caps for contracts generally, and for construction contracts on county highways, bridges, subways, and those entered into by the county’s waterworks district and flood control district.
For contracts exceeding $25 million, the delegated change order cap was increased to $400,000, with an annual CPI adjustment. For contracts exceeding $50 million, the delegated change order cap was increased to $750,000, with an annual CPI adjustment. The bill provided that, if the board of supervisors delegates authority for these change orders, the decision by the county engineer or other county officer is binding on LA County, and all existing protest and grievance procedures regarding that decision remain valid. The board must implement appropriate measures to prevent fraud and ensure accountability for this delegated authority.
AB 712 was limited to a total of seven contracts and required LA County to provide a report to the Assembly Local Government Committee and the Senate Governance and Finance Committee no later than July 1, 2026, if it elects to utilize the provisions of the bill. AB 712 contained a sunset date of January 1, 2027.
- Delegated Authority Limits for Santa Clara County. Following closely on the heels of AB 712, the Legislature approved AB 1649 (Kalra), Chapter 281, Statutes of 2023. AB 1649 extended to Santa Clara County nearly the same delegated authority that was granted to LA County via AB 712.
- Reports From the Counties. Both Santa Clara County and LA County have submitted their reports to the Legislature that were required by AB 712 and AB 1649.
According to the report submitted by Santa Clara County, “Since the higher delegated change order limits for a select number of projects became effective for the County of Santa Clara on January 1, 2024, the County of Santa Clara has used the higher-level authority on one project and plans to use it on some other existing projects before the existing legislation sunsets. The one project where the authority has been used…resulted in saving staff time and cost to develop and process items on the Board agenda for three separate Board actions. In addition, the authority minimized project schedule delays and mitigated extended general conditions costs.”
According to the report submitted by LA County, “Since approval of the higher delegated change order authority effective January 1, 2022, Los Angeles County Public Works has utilized the expanded authority on five projects to date, though two of these projects are still in early stages of construction…The temporary delegated authority authorized by AB 712 has clearly demonstrated its value. Across the five projects listed above, this authority has been utilized for approval of 24 change orders under the expanded delegation that would otherwise have required separate Board actions. Use of this authority has avoided significant administrative costs, reduced exposure to schedule delays, and generated documented cost avoidance exceeding $40 million, including the prevention of approximately 12 months of delay on the Harbor-UCLA Medical Center Replacement Program.
“These benefits extend beyond administrative efficiency. The authority has supported timely delivery of critical public facilities, including hospitals, water infrastructure, stormwater capture projects, and other capital investments that directly affect public health, safety, environmental protection, and community resilience. In several cases, the authority has also reduced the County’s exposure to regulatory risk and potential financial penalties. Since approval of this legislation, more than 40 County projects would have qualified for the expanded delegated authority absent the 7-project cap; accordingly, Public Works reserved the remaining two project authorizations allowed under AB 712 for future eligible projects.”
- Bill Summary. This bill makes permanent the ability of LA County and Santa Clara County to use higher change order limits as authorized by AB 712 and AB 1649 by removing the existing sunset date of January 1, 2027, that applies to those authorizations.
This bill also removes the cap on the total number of contracts, which is seven under existing law, for which LA County and Santa Clara County may use the higher change order limits.
Lastly, this bill removes the requirement that LA County and Santa Clara County provide reports to the Assembly Local Government Committee and the Senate Governance and Finance Committee if they elect to utilize their higher change order limits.
This bill is sponsored by Santa Clara County.
- Previous Legislation. AB 1649 (Kalra), Chapter 281, Statutes of 2023, temporarily increased the limits that apply to change orders that can be approved pursuant to a delegated authority for specified contracts entered into by Santa Clara County.
AB 712 (Calderon), Chapter 95, Statutes of 2021, temporarily increased the limits that apply to change orders that can be approved pursuant to a delegated authority for specified contracts entered into by LA County.
AB 2284 (Calderon) of 2020 would have increased delegated change order limits for all counties and required annual CPI adjustments. AB 2284 was held in this Committee.
- Arguments in Support. The County of Santa Clara, sponsor of this bill, writes, “Change orders are amendments to a construction contract that change the contractor’s scope of work, including moving a drainpipe or a wall. Often, these changes cannot reasonably be identified prior to excavation and are caught only after installation has begun. Under California law, the Local Agency Public Construction Act allows a Board of Supervisors to approve change orders with a two-thirds vote and delegate a designated officer to execute change orders on behalf of the Board below certain monetary limits. The maximum allowable delegation limits have not been updated for counties since 2011, and they do not reflect the significant rise in inflation and construction costs. This causes delays in approval, which lengthen construction time and increase costs to taxpayers.
“In 2021 and 2023, the Legislature authorized the Counties of Los Angeles and Santa Clara, respectively, to increase the maximum allowable delegation amount for up to seven projects and:
- For contracts $25-$50 million, the change order must not exceed $400,000, adjusted annually to reflect the percentage change in the California Consumer Price Index.
- For contracts over $50 million, the change order must not exceed $750,000, adjusted annually to reflect the percentage change in the California Consumer Price Index.
“Since the authority was approved, the County has used it during construction of a new Behavioral Health Services Center (BHSC) at one of our hospitals, Valley Medical Center. This building is over 200,000 square feet and holds a 77-bed acute psychiatric hospital for children, adolescents, and adults, a 56-bed Emergency Psychiatric Facility, a Mental Health Urgent Care Facility, and other areas. The contract change order authority was used nearly 60 times on the project, helping the County save 20 months of time during construction.
“AB 1658 would make permanent these updates to the Local Agency Public Construction Act for the Counties of Los Angeles and Santa Clara related to change orders. The authority works – the ability to administratively execute change orders has reduced construction delays and saved critical public dollars. At a time where counties are facing budget deficits, particularly due to the devastating funding cuts of H.R. 1, it is critical that construction projects stay as close to on-time as possible to avoid costly delays.”
- Arguments in Opposition. None on file.
REGISTERED SUPPORT / OPPOSITION:
Support
County of Santa Clara [SPONSOR]
County of Los Angeles
Opposition
None on file
Analysis Prepared by: Angela Mapp / L. GOV. / (916) 319-3958