(1)The California Coastal Act of 1976 requires any person wishing to perform or undertake any development in the coastal zone, as defined, in addition to obtaining any other permit required by law from any local government or from any state, regional, or local agency, to obtain a coastal development permit, as provided. The act requires each local government lying in whole or in part within the coastal zone to prepare a local coastal program for that portion of the coastal zone within its jurisdiction. The act requires a land use plan of a proposed local coastal program to be submitted to the California Coastal Commission for certification. The act authorizes the commission to extend, for a period not to exceed one year, certain time limitations relating to local coastal programs for good cause.
This bill would authorize the commission to retroactively extend, for good cause and a period not to exceed 5 years, a time limitation established for a local government to act on the commissions suggested modifications to a land use plan amendment that would authorize approval of an affordable housing development, as specified.
(2)Existing law establishes the Natural Resources Agency and vests the agency with jurisdiction over various public resources. Existing law establishes the California Environmental Protection Agency and sets out its mission for programs, policies, and standards. Under existing law, various state entities, including the California Coastal Commission, the California Environmental Protection Agency, and the Department of Fish and Wildlife have responsibilities with respect to coastal permitting and development.
This bill would require the Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, to convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed in specified areas. The bill would require the Coastal Resilience Permitting Working Group to consist of representatives from federal, state, and local agencies, including, among others, the California Coastal Commission, the California Environmental Protection Agency, and the Department of Fish and Wildlife. The bill would, on or before July 1, 2028, require the Secretary of the Natural Resources Agency to submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature. The bill would require, on or before April 1, 2027, the Secretary of the Natural Resources Agency, in collaboration with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, the State Water Resources Control Board, and representatives from the Regional Water Quality Control Boards to convene a Coastal Resilience Permit Advisory Group to support the deliberations of the Coastal Resilience Permitting Working Group.
(1)The California Coastal Act of 1976 requires any person wishing to perform or undertake any development in the coastal zone, as defined, in addition to obtaining any other permit required by law from any local government or from any state, regional, or local agency, to obtain a coastal development permit, as provided. The act requires each local government lying in whole or in part within the coastal zone to prepare a local coastal program for that portion of the coastal zone within its jurisdiction. The act requires a land use plan of a proposed local coastal program to be submitted to the California Coastal Commission for certification. The act authorizes the commission to extend, for a period not to exceed one year, certain time limitations relating to local coastal programs for good cause.
This bill would authorize the commission to retroactively extend, for good cause and a period not to exceed 5 years, a time limitation established for a local government to act on the commissions suggested modifications to a land use plan amendment that would authorize approval of an affordable housing development, as specified.
(2)Existing law establishes the Natural Resources Agency and vests the agency with jurisdiction over various public resources. Existing law establishes the California Environmental Protection Agency and sets out its mission for programs, policies, and standards. Under existing law, various state entities, including the California Coastal Commission, the California Environmental Protection Agency, and the Department of Fish and Wildlife have responsibilities with respect to coastal permitting and development.
This bill would require the Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, to convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed in specified areas. The bill would require the Coastal Resilience Permitting Working Group to consist of representatives from federal, state, and local agencies, including, among others, the California Coastal Commission, the California Environmental Protection Agency, and the Department of Fish and Wildlife. The bill would, on or before July 1, 2028, require the Secretary of the Natural Resources Agency to submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature. The bill would require, on or before April 1, 2027, the Secretary of the Natural Resources Agency, in collaboration with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, the State Water Resources Control Board, and representatives from the Regional Water Quality Control Boards to convene a Coastal Resilience Permit Advisory Group to support the deliberations of the Coastal Resilience Permitting Working Group.
(1)The California Coastal Act of 1976 requires any person wishing to perform or undertake any development in the coastal zone, as defined, in addition to obtaining any other permit required by law from any local government or from any state, regional, or local agency, to obtain a coastal development permit, as provided. The act requires each local government lying in whole or in part within the coastal zone to prepare a local coastal program for that portion of the coastal zone within its jurisdiction. The act requires a land use plan of a proposed local coastal program to be submitted to the California Coastal Commission for certification. The act authorizes the commission to extend, for a period not to exceed one year, certain time limitations relating to local coastal programs for good cause.
This bill would authorize the commission to retroactively extend, for good cause and a period not to exceed 5 years, a time limitation established for a local government to act on the commissions suggested modifications to a land use plan amendment that would authorize approval of an affordable housing development, as specified.
Existing(2)Existing law establishes the Natural Resources Agency and vests the agency with jurisdiction over various public resources. Existing law establishes the California Environmental Protection Agency and sets out its mission for programs, policies, and standards. Under existing law, various state entities, including the California Coastal Commission, the California Environmental Protection Agency, and the Department of Fish and Wildlife have responsibilities with respect to coastal permitting and development.
This bill would require the Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, to convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed in specified areas. The bill would require the Coastal Resilience Permitting Working Group to consist of representatives from federal, state, and local agencies, including, among others, the California Coastal Commission, the California Environmental Protection Agency, and the Department of Fish and Wildlife. The bill would, on or before July 1, 2028, require the Secretary of the Natural Resources Agency to submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature. The bill would require, on or before April 1, 2027, the Secretary of the Natural Resources Agency, in collaboration with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, the State Water Resources Control Board, and representatives from the Regional Water Quality Control Boards to convene a Coastal Resilience Permit Advisory Group to support the deliberations of the Coastal Resilience Permitting Working Group.
Existing law establishes the Natural Resources Agency and vests the agency with jurisdiction over various public resources. Existing law establishes the California Environmental Protection Agency and sets out its mission for programs, policies, and standards. Under existing law, various state entities, including the California Coastal Commission, the California Environmental Protection Agency, and the Department of Fish and Wildlife have responsibilities with respect to coastal permitting and development.
This bill would require the Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, to convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed in specified areas. The bill would require the Coastal Resilience Permitting Working Group to consist of representatives from federal, state, and local agencies, including, among others, the California Coastal Commission, the California Environmental Protection Agency, and the Department of Fish and Wildlife. The bill would, on or before January July 1, 2028, require the Secretary of the Natural Resources Agency to submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature. The bill would require, on or before April 1, 2027, the Secretary of the Natural Resources Agency, in collaboration with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, and the California Regional Water Quality Boards with jurisdiction over the coast and the San Francisco Bay, the State Water Resources Control Board, and representatives from the Regional Water Quality Control Boards to convene a Coastal Resilience Permit Advisory Group to support the deliberations of the Coastal Resilience Permitting Working Group.
Existing law establishes the Natural Resources Agency and vests the agency with jurisdiction over various public resources. Existing law establishes the California Environmental Protection Agency and sets out its mission for programs, policies, and standards. Under existing law, various state entities, including the California Coastal Commission, the California Environmental Protection Agency, and the Department of Fish and Wildlife have responsibilities with respect to coastal permitting and development.
This bill would require the Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, to convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed in specified areas. The bill would require the Coastal Resilience Permitting Working Group to consist of representatives from federal, state, and local agencies, including, among others, the California Coastal Commission, the California Environmental Protection Agency, and the Department of Fish and Wildlife. The bill would, on or before January 1, 2028, require the Secretary of the Natural Resources Agency to submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature. The bill would require, on or before April 1, 2027, the Secretary of the Natural Resources Agency, in collaboration with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, and the California Regional Water Quality Boards with jurisdiction over the coast and the San Francisco Bay, to convene a Coastal Resilience Permit Advisory Group to support the deliberations of the Coastal Resilience Permitting Working Group.
Existing law establishes the Natural Resources Agency and vests the agency with jurisdiction over various public resources. Existing law establishes the California Environmental Protection Agency and sets out its mission for programs, policies, and standards. Under existing law, various state entities, including the California Coastal Commission, the California Environmental Protection Agency, and the Department of Fish and Wildlife have responsibilities with respect to coastal permitting and development.
This bill would require the Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, to convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed in specified areas. The bill would require the Coastal Resilience Permitting Working Group to consist of representatives from federal, state, and local agencies, including, among others, the California Coastal Commission, the California Environmental Protection Agency, and the Department of Fish and Wildlife. The bill would, on or before January 1, 2028, require the Secretary of the Natural Resources Agency to submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature. The bill would require, on or before April 1, 2027, the Secretary of the Natural Resources Agency, in collaboration with the California Coastal Commission and Commission, the San Francisco Bay Conservation and Development Commission, in collaboration with the Department of Fish and Wildlife Wildlife, and the California Regional Water Quality Boards with jurisdiction over the coast and the San Francisco Bay, to convene a Coastal Resilience Permit Advisory Group to support the deliberations of the Coastal Resilience Permitting Working Group.
Existing law establishes the Natural Resources Agency and vests the agency with jurisdiction over various public resources. Existing law establishes the California Environmental Protection Agency and sets out its mission for programs, policies, and standards. Under existing law, various state entities, including the California Coastal Commission, the California Environmental Protection Agency, and the Department of Fish and Wildlife have responsibilities with respect to coastal permitting and development.
This bill would require the Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, to convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed in specified areas. The bill would require the Coastal Resilience Permitting Working Group to consist of representatives from federal, state, and local agencies, including, among others, the California Coastal Commission, the California Environmental Protection Agency, and the Department of Fish and Wildlife. The bill would, on or before January 1, 2028, require the Secretary of the Natural Resources Agency to submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature. The bill would require, on or before April 1, 2027, the California Coastal Commission and the San Francisco Bay Conservation and Development Commission, in collaboration with the Department of Fish and Wildlife and the California Regional Water Quality Boards with jurisdiction over the coast and the San Francisco Bay, to convene a Coastal Resilience Permit Advisory Group to support the deliberations of the Coastal Resilience Permitting Working Group.
(a)For good cause, the commission may extend, for a period not to exceed one year, any time limitation established by this chapter.
(b)(1)For good cause, the commission may retroactively extend, for a period not to exceed five years, any time limitation established for a local government to act on the commissions suggested modifications to a land use plan amendment that would authorize approval of a 100-percent affordable housing development that meets the definition of affordable housing in Section 21080.27.
(2)Paragraph (1) applies only to commission approval of a land use plan amendment with suggested modifications that otherwise would have expired between January 1, 2025, and December 31, 2026, inclusive, whether or not previously extended under subdivision (a).
SEC. 2.Division 20.8 (commencing with Section 30990) is added to the Public Resources Code, to read:20.8.Coastal Resilience30990.(a)The Legislature finds and declares all of the following:
(1)The Ocean Protection Councils 2024 State of California Sea Level Rise Guidance includes a projection that by the year 2100, statewide averaged sea levels are expected to rise between 1.6 feet and 3.1 feet under the Intermediate-Low and Intermediate Scenarios.
(2)The Ocean Protection Councils guidance also notes that higher amounts of up to 6.6 feet or more of sea level rise in very high risk, low-probability cases cannot be ruled out.
(3)In 2023, the Metropolitan Transportation Commission of the San Francisco Bay area, in consultation with the Association of Bay Area Governments and the San Francisco Bay Conservation and Development Commission, published the Sea Level Rise Adaptation Funding and Investment Framework Final Report with an estimate of one hundred ten billion dollars ($110,000,000,000) to adapt San Francisco Bay communities and critical infrastructure to sea level rise by 2050.
(4)In 2024, the Legislature adopted Division 20.6.9 (commencing with Section 30985) requiring the California Coastal Commission and the San Francisco Bay Conservation and Development Commission to publish guidelines for the preparation of sea level rise plans and for local communities to seek review and approval of these plans by 2034 to remain eligible for resilience funding from the state.
(5)Construction activities along the California coast and in the San Francisco Bay in federal waters are regulated by a wide range of state and federal agencies operating under a comprehensive set of state and federal environmental laws.
(6)California promotes the use of natural infrastructure, where feasible, to build coastal resilience, which is described in Section 71154 as using natural ecological systems or processes to reduce vulnerability to climate change-related hazards, or other related climate change effects, while increasing the long-term adaptive capacity of coastal and inland areas by perpetuating or restoring ecosystem services.
(7)The National Oceanic and Atmospheric Administrations North-Central California Coastal Sediment Coordination Committee published a 2024 Efficient Permitting Roadmap that provides a description of permitting roles for state and federal agencies and preferred approaches for habitat restoration projects.
(8)Together, these laws and the work of these agencies, provide critical protection for the health of the Pacific Ocean and the San Francisco Bay.
(9)The combination of overlapping federal and state authorities, requirements for project-specific studies, limited regulatory agency staffing, interagency coordination needs, and inconsistency and uncertainty regarding mitigation requirements can result in extended permitting timelines for all projects in or adjacent to federal waters, including coastal resilience projects.
(10)Permitting staff positions at relevant agencies require extensive education and experience regarding complex ecosystems and marine environments, and related expertise such as knowledge of historic and cultural resources.
(11)Numerous reports, including the California Coastal Commission 20212025 Workforce Plan, the University of California Berkeley Labor Centers Civil Service Vacancies in California: 20222023, the Central Coast Regional Water Quality Control Boards 2022 Executive Officers Report, and the 2025 National Conference of State Historic Preservation Officers Workforce Report, document the challenge of recruiting and retaining qualified staff to process complicated permit applications.
(12)The Governor and the Legislature have previously addressed permitting timelines and processes related to rebuilding after natural disasters such as the January 2025 wildfires, and to facilitate timely development and permitting of offshore wind and transmission facilities in the state.
(13)The Assembly Select Committee on Permitting Reform issued a report in 2025 documenting the permitting challenges that most projects face trying to navigate the 7 to 12 agencies that have regulatory jurisdiction over resiliency projects. This report recommended eliminating uncertainty in the application process, enhancing interagency coordination and consistency, and creating distinct permitting pathways for drought resilience and flood risk reduction projects.
(b)Given the myriad of benefits from coastal resilience projects to California communities, the Secretary of the Natural Resources Agency shall develop a Coastal Resilience Permitting Roadmap with recommendations for process improvements and legislative reforms that will enable efficient and timely delivery of environmental approvals for these projects, as provided in Section 30991.
30991.(a)(1)The Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, shall convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and in and adjacent to state and federal waters.
(2)The Coastal Resilience Permitting Working Group shall consist of representatives from federal, state, and local agencies, including, but not limited to, representatives from all of the following entities:
(A)The California Coastal Commission.
(B)The California Environmental Protection Agency.
(C)The State Water Resources Control Board and representatives from the Regional Water Quality Control Boards.
(D)The Department of Fish and Wildlife.
(E)The Governors Office of Land Use and Climate Innovation.
(F)The Natural Resources Agency.
(G)The Ocean Protection Council.
(H)The San Francisco Bay Conservation and Development Commission.
(I)The State Coastal Conservancy.
(J)The State Lands Commission.
(K)The State Office of Historic Preservation.
(3)Development of the Coastal Resilience Permitting Roadmap shall incorporate, but not delay, progress to advance responsible permitting and development of coastal resilience projects.
(b)(1)On or before July 1, 2028, the Secretary of the Natural Resources Agency shall submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature.
(2)The plan submitted to the Legislature pursuant to paragraph (1) shall be submitted in compliance with Section 9795 of the Government Code.
(3)Pursuant to Section 10231.5 of the Government Code, this subdivision shall become inoperative on January 1, 2032.
(c)The Coastal Resilience Permitting Roadmap developed pursuant to paragraph (1) of subdivision (a) shall include, at a minimum, recommendations that address all of the following:
(1)Administrative reforms that can be implemented by state agencies, to the extent feasible, within their existing authority to improve permit issuance timelines, including all of the following:
(A)Improving efficiency in the process for agencies to determine and communicate that permit applications are complete, through the use of tools, such as preapplication consultations, publishing clear permit guidelines, minimizing additional information requests when applicants submit complete applications consistent with permit guidelines, and setting timelines for initial and successive reviews.
(B)Unified applications with a predictable sequence and timeline of permitting information requests and interagency reviews.
(C)Statewide or regional interagency project management teams for multiagency permitting, modeled on the Bay Restoration Regulatory Integration Team.
(D)Methods to standardize compensatory mitigation across agencies, as applicable and feasible, including rewarding the consideration of engineering with nature features to enable projects to self-mitigate, and the consideration of types and thresholds for small amounts of fill that may not require mitigation because they may be beneficial or can be shown to have negligible impacts.
(E)Delegating permit issuance to executive officers or using consent calendars when appropriate and applicable.
(F)Expanded use of regional general permits and programmatic agreements for known categories of coastal resilience projects.
(G)Process improvements that allow for permit approval when the design is being developed or is complete, and for permit approval to be maintained during subsequent nonsubstantive design changes arising from field conditions and in-depth engineering analysis.
(H)Standard measures and methods that can be applied to borings, pile driving and fill placement techniques, and other practices that are known to safeguard marine resources, including the types of conditions under which these measures should be utilized and can be scaled to varying project scope and footprint, taking into consideration variability across the ocean floor topographies.
(I)Recommendations for how to expedite and streamline the permitting of projects included in local sea level rise adaptation plans, as required by the Regional Shoreline Adaptation Plan (BPA 1-24) adopted by the San Francisco Bay Conservation and Development Commission and by the Sea Level Rise Policy Guidance adopted by the California Coastal Commission, respectively, as an incentive to complete and implement local plans.
(J)Consideration of project-based permit streamlining.
(2)A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, thereby avoiding temporal loss of habitat and associated increased mitigation requirements, and reducing the need for individual applicants to develop and implement project-specific compensatory mitigation projects.
(3)Legislative reforms that have the greatest potential to further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements that result in extensive analysis that could be avoided by application of standardized compensatory mitigation, as feasible and appropriate, advance mitigation, or standard construction practices, as well as identification of regulatory gaps and frictions that could lead to maladaptation over time.
(4)If needed to test alternative approaches, a coastal resilience project pilot program along with any required legislative authorizations to evaluate the effectiveness of recommended reforms and environmental protection methods.
(5)An evaluation of whether consolidated coastal resilience permits similar to those provided in Division 20 (commencing with Section 30000) for offshore wind projects would facilitate timely permits.
(6)A workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, including a specific analysis of recommended pay scales needed to recruit and retain permitting staff that reflect the educational requirements for these positions, the cost of living in areas where these staff live and work, and private sector compensation for similar skills.
(d)To support deliberations of the Coastal Resilience Permitting Working Group, on or before April 1, 2027, the Secretary of the Natural Resources Agency, in collaboration with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, and the State Water Resources Control Board, and representatives from the Regional Water Quality Control Boards, shall convene a Coastal Resilience Permit Advisory Group. Coastal Resilience Permit Advisory Group membership may include, but not be limited to, representatives of each of the following:
(1)The Department of Transportation, the State Coastal Conservancy, and other relevant state agencies that seek permits for projects in coastal areas.
(2)Local governments subject to the requirements of Division 20.6.9 (commencing with Section 30985).
(3)California ports.
(4)Local transportation agencies, special districts, stormwater management agencies, and wastewater treatment agencies that serve jurisdictions subject to Division 20.6.9 (commencing with Section 30985).
(5)California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission.
(6)Other members of the public, including academics, businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, environmental justice organizations, professional associations, and others.
(e)The Secretary of the Natural Resources Agency, in consultation with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, the State Water Resources Control Board, and representatives from the Regional Water Quality Control Boards, shall conduct a series of public workshops with the Coastal Resilience Permit Advisory Group or subgroups thereof to do all of the following:
(1)Solicit feedback regarding challenges with existing permitting processes, and recommendations and concerns from permittees and other interested parties regarding streamlining proposals.
(2)Review and seek comment on draft reform proposals from the Coastal Resilience Permitting Working Group for potential inclusion in the Coastal Resilience Permitting Roadmap.
(f)When developing infrastructure to address adaptation, where feasible, a project alternative should be developed that uses existing natural features and ecosystem processes, or the restoration of natural features and ecosystem processes, to meet the projects goals.
(g)For purposes of this section, coastal resilience project means a project that maintains, protects, restores, or enables coastal ecosystems, infrastructure, or communities to withstand and adapt to sea level rise and other natural hazards, including those amplified by climate change.
(a)For good cause, the commission may extend, for a period not to exceed one year, any time limitation established by this chapter.
(b)(1)For good cause, the commission may retroactively extend, for a period not to exceed five years, any time limitation established for a local government to act on the commissions suggested modifications to a land use plan amendment that would authorize approval of a 100-percent affordable housing development that meets the definition of affordable housing in Section 21080.27.
(2)Paragraph (1) applies only to commission approval of a land use plan amendment with suggested modifications that otherwise would have expired between January 1, 2025, and December 31, 2026, inclusive, whether or not previously extended under subdivision (a).
SEC. 2.Division 20.8 (commencing with Section 30990) is added to the Public Resources Code, to read:20.8.Coastal Resilience30990.(a)The Legislature finds and declares all of the following:
(1)The Ocean Protection Councils 2024 State of California Sea Level Rise Guidance includes a projection that by the year 2100, statewide averaged sea levels are expected to rise between 1.6 feet and 3.1 feet under the Intermediate-Low and Intermediate Scenarios.
(2)The Ocean Protection Councils guidance also notes that higher amounts of up to 6.6 feet or more of sea level rise in very high risk, low-probability cases cannot be ruled out.
(3)In 2023, the Metropolitan Transportation Commission of the San Francisco Bay area, in consultation with the Association of Bay Area Governments and the San Francisco Bay Conservation and Development Commission, published the Sea Level Rise Adaptation Funding and Investment Framework Final Report with an estimate of one hundred ten billion dollars ($110,000,000,000) to adapt San Francisco Bay communities and critical infrastructure to sea level rise by 2050.
(4)In 2024, the Legislature adopted Division 20.6.9 (commencing with Section 30985) requiring the California Coastal Commission and the San Francisco Bay Conservation and Development Commission to publish guidelines for the preparation of sea level rise plans and for local communities to seek review and approval of these plans by 2034 to remain eligible for resilience funding from the state.
(5)Construction activities along the California coast and in the San Francisco Bay in federal waters are regulated by a wide range of state and federal agencies operating under a comprehensive set of state and federal environmental laws.
(6)California promotes the use of natural infrastructure, where feasible, to build coastal resilience, which is described in Section 71154 as using natural ecological systems or processes to reduce vulnerability to climate change-related hazards, or other related climate change effects, while increasing the long-term adaptive capacity of coastal and inland areas by perpetuating or restoring ecosystem services.
(7)The National Oceanic and Atmospheric Administrations North-Central California Coastal Sediment Coordination Committee published a 2024 Efficient Permitting Roadmap that provides a description of permitting roles for state and federal agencies and preferred approaches for habitat restoration projects.
(8)Together, these laws and the work of these agencies, provide critical protection for the health of the Pacific Ocean and the San Francisco Bay.
(9)The combination of overlapping federal and state authorities, requirements for project-specific studies, limited regulatory agency staffing, interagency coordination needs, and inconsistency and uncertainty regarding mitigation requirements can result in extended permitting timelines for all projects in or adjacent to federal waters, including coastal resilience projects.
(10)Permitting staff positions at relevant agencies require extensive education and experience regarding complex ecosystems and marine environments, and related expertise such as knowledge of historic and cultural resources.
(11)Numerous reports, including the California Coastal Commission 20212025 Workforce Plan, the University of California Berkeley Labor Centers Civil Service Vacancies in California: 20222023, the Central Coast Regional Water Quality Control Boards 2022 Executive Officers Report, and the 2025 National Conference of State Historic Preservation Officers Workforce Report, document the challenge of recruiting and retaining qualified staff to process complicated permit applications.
(12)The Governor and the Legislature have previously addressed permitting timelines and processes related to rebuilding after natural disasters such as the January 2025 wildfires, and to facilitate timely development and permitting of offshore wind and transmission facilities in the state.
(13)The Assembly Select Committee on Permitting Reform issued a report in 2025 documenting the permitting challenges that most projects face trying to navigate the 7 to 12 agencies that have regulatory jurisdiction over resiliency projects. This report recommended eliminating uncertainty in the application process, enhancing interagency coordination and consistency, and creating distinct permitting pathways for drought resilience and flood risk reduction projects.
(b)Given the myriad of benefits from coastal resilience projects to California communities, the Secretary of the Natural Resources Agency shall develop a Coastal Resilience Permitting Roadmap with recommendations for process improvements and legislative reforms that will enable efficient and timely delivery of environmental approvals for these projects, as provided in Section 30991.
30991.(a)(1)The Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, shall convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and in and adjacent to state and federal waters.
(2)The Coastal Resilience Permitting Working Group shall consist of representatives from federal, state, and local agencies, including, but not limited to, representatives from all of the following entities:
(A)The California Coastal Commission.
(B)The California Environmental Protection Agency.
(C)The State Water Resources Control Board and representatives from the Regional Water Quality Control Boards.
(D)The Department of Fish and Wildlife.
(E)The Governors Office of Land Use and Climate Innovation.
(F)The Natural Resources Agency.
(G)The Ocean Protection Council.
(H)The San Francisco Bay Conservation and Development Commission.
(I)The State Coastal Conservancy.
(J)The State Lands Commission.
(K)The State Office of Historic Preservation.
(3)Development of the Coastal Resilience Permitting Roadmap shall incorporate, but not delay, progress to advance responsible permitting and development of coastal resilience projects.
(b)(1)On or before July 1, 2028, the Secretary of the Natural Resources Agency shall submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature.
(2)The plan submitted to the Legislature pursuant to paragraph (1) shall be submitted in compliance with Section 9795 of the Government Code.
(3)Pursuant to Section 10231.5 of the Government Code, this subdivision shall become inoperative on January 1, 2032.
(c)The Coastal Resilience Permitting Roadmap developed pursuant to paragraph (1) of subdivision (a) shall include, at a minimum, recommendations that address all of the following:
(1)Administrative reforms that can be implemented by state agencies, to the extent feasible, within their existing authority to improve permit issuance timelines, including all of the following:
(A)Improving efficiency in the process for agencies to determine and communicate that permit applications are complete, through the use of tools, such as preapplication consultations, publishing clear permit guidelines, minimizing additional information requests when applicants submit complete applications consistent with permit guidelines, and setting timelines for initial and successive reviews.
(B)Unified applications with a predictable sequence and timeline of permitting information requests and interagency reviews.
(C)Statewide or regional interagency project management teams for multiagency permitting, modeled on the Bay Restoration Regulatory Integration Team.
(D)Methods to standardize compensatory mitigation across agencies, as applicable and feasible, including rewarding the consideration of engineering with nature features to enable projects to self-mitigate, and the consideration of types and thresholds for small amounts of fill that may not require mitigation because they may be beneficial or can be shown to have negligible impacts.
(E)Delegating permit issuance to executive officers or using consent calendars when appropriate and applicable.
(F)Expanded use of regional general permits and programmatic agreements for known categories of coastal resilience projects.
(G)Process improvements that allow for permit approval when the design is being developed or is complete, and for permit approval to be maintained during subsequent nonsubstantive design changes arising from field conditions and in-depth engineering analysis.
(H)Standard measures and methods that can be applied to borings, pile driving and fill placement techniques, and other practices that are known to safeguard marine resources, including the types of conditions under which these measures should be utilized and can be scaled to varying project scope and footprint, taking into consideration variability across the ocean floor topographies.
(I)Recommendations for how to expedite and streamline the permitting of projects included in local sea level rise adaptation plans, as required by the Regional Shoreline Adaptation Plan (BPA 1-24) adopted by the San Francisco Bay Conservation and Development Commission and by the Sea Level Rise Policy Guidance adopted by the California Coastal Commission, respectively, as an incentive to complete and implement local plans.
(J)Consideration of project-based permit streamlining.
(2)A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, thereby avoiding temporal loss of habitat and associated increased mitigation requirements, and reducing the need for individual applicants to develop and implement project-specific compensatory mitigation projects.
(3)Legislative reforms that have the greatest potential to further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements that result in extensive analysis that could be avoided by application of standardized compensatory mitigation, as feasible and appropriate, advance mitigation, or standard construction practices, as well as identification of regulatory gaps and frictions that could lead to maladaptation over time.
(4)If needed to test alternative approaches, a coastal resilience project pilot program along with any required legislative authorizations to evaluate the effectiveness of recommended reforms and environmental protection methods.
(5)An evaluation of whether consolidated coastal resilience permits similar to those provided in Division 20 (commencing with Section 30000) for offshore wind projects would facilitate timely permits.
(6)A workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, including a specific analysis of recommended pay scales needed to recruit and retain permitting staff that reflect the educational requirements for these positions, the cost of living in areas where these staff live and work, and private sector compensation for similar skills.
(d)To support deliberations of the Coastal Resilience Permitting Working Group, on or before April 1, 2027, the Secretary of the Natural Resources Agency, in collaboration with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, and the State Water Resources Control Board, and representatives from the Regional Water Quality Control Boards, shall convene a Coastal Resilience Permit Advisory Group. Coastal Resilience Permit Advisory Group membership may include, but not be limited to, representatives of each of the following:
(1)The Department of Transportation, the State Coastal Conservancy, and other relevant state agencies that seek permits for projects in coastal areas.
(2)Local governments subject to the requirements of Division 20.6.9 (commencing with Section 30985).
(3)California ports.
(4)Local transportation agencies, special districts, stormwater management agencies, and wastewater treatment agencies that serve jurisdictions subject to Division 20.6.9 (commencing with Section 30985).
(5)California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission.
(6)Other members of the public, including academics, businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, environmental justice organizations, professional associations, and others.
(e)The Secretary of the Natural Resources Agency, in consultation with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, the State Water Resources Control Board, and representatives from the Regional Water Quality Control Boards, shall conduct a series of public workshops with the Coastal Resilience Permit Advisory Group or subgroups thereof to do all of the following:
(1)Solicit feedback regarding challenges with existing permitting processes, and recommendations and concerns from permittees and other interested parties regarding streamlining proposals.
(2)Review and seek comment on draft reform proposals from the Coastal Resilience Permitting Working Group for potential inclusion in the Coastal Resilience Permitting Roadmap.
(f)When developing infrastructure to address adaptation, where feasible, a project alternative should be developed that uses existing natural features and ecosystem processes, or the restoration of natural features and ecosystem processes, to meet the projects goals.
(g)For purposes of this section, coastal resilience project means a project that maintains, protects, restores, or enables coastal ecosystems, infrastructure, or communities to withstand and adapt to sea level rise and other natural hazards, including those amplified by climate change.
(a)For good cause, the commission may extend, for a period of not to exceed one year, any time limitation established by this chapter for good cause. chapter.
(b)(1)For good cause, the commission may retroactively extend, for a period not to exceed five years, any time limitation established for a local government to act on the commissions suggested modifications to a land use plan amendment that would authorize approval of a 100-percent affordable housing development that meets the definition of affordable housing in Section 21080.27.
(2)Paragraph (1) applies only to commission approval of a land use plan amendment with suggested modifications that otherwise would have expired between January 1, 2025, and December 31, 2026, inclusive, whether or not previously extended under subdivision (a).
SECTION 1.SEC. 2.Division 20.8 (commencing with Section 30990) is added to the Public Resources Code, to read:20.8.Coastal Resilience30990.(a)The Legislature finds and declares all of the following:
(1)The Ocean Protection Councils 2024 State of California Sea Level Rise Guidance includes a projection that by the year 2100, statewide averaged sea levels are expected to rise between 1.6 feet and 3.1 feet under the Intermediate-Low and Intermediate Scenarios.
(2)The Ocean Protection Councils guidance also notes that higher amounts of up to 6.6 feet or more of sea level rise in very high risk, low-probability cases cannot be ruled out.
(3)In 2023, the Metropolitan Transportation Commission of the San Francisco Bay area, in consultation with the Association of Bay Area Governments and the San Francisco Bay Conservation and Development Commission, published the Sea Level Rise Adaptation Funding and Investment Framework Final Report with an estimate of one hundred ten billion dollars ($110,000,000,000) to adapt San Francisco Bay communities and critical infrastructure to sea level rise by 2050.
(4)In 2024, the Legislature adopted Division 20.6.9 (commencing with Section 30985) requiring the California Coastal Commission and the San Francisco Bay Conservation and Development Commission to publish guidelines for the preparation of sea level rise plans and for local communities to seek review and approval of these plans by 2034 to remain eligible for resilience funding from the state.
(5)Construction activities along the California coast and in the San Francisco Bay in federal waters are regulated by a wide range of state and federal agencies operating under a comprehensive set of state and federal environmental laws.
(6)California promotes the use of natural infrastructure, where feasible, to build coastal resilience, which is described in Section 71154 as using natural ecological systems or processes to reduce vulnerability to climate change-related hazards, or other related climate change effects, while increasing the long-term adaptive capacity of coastal and inland areas by perpetuating or restoring ecosystem services.
(7)The National Oceanic and Atmospheric Administrations North-Central California Coastal Sediment Coordination Committee published a 2024 Efficient Permitting Roadmap that provides a description of permitting roles for state and federal agencies and preferred approaches for habitat restoration projects.
(8)Together, these laws and the work of these agencies, provide critical protection for the health of the Pacific Ocean and the San Francisco Bay.
(9)The combination of overlapping federal and state authorities, requirements for project-specific studies, limited regulatory agency staffing, interagency coordination needs, and inconsistency and uncertainty regarding mitigation requirements can result in extended permitting timelines for all projects in or adjacent to federal waters, including coastal resilience projects.
(10)Permitting staff positions at relevant agencies require extensive education and experience regarding complex ecosystems and marine environments, and related expertise such as knowledge of historic and cultural resources.
(11)Numerous reports, including the California Coastal Commission 20212025 Workforce Plan, the University of California Berkeley Labor Centers Civil Service Vacancies in California: 20222023, the Central Coast Regional Water Quality Control Boards 2022 Executive Officers Report, and the 2025 National Conference of State Historic Preservation Officers Workforce Report, document the challenge of recruiting and retaining qualified staff to process complicated permit applications.
(12)The Governor and the Legislature have previously addressed permitting timelines and processes related to rebuilding after natural disasters such as the January 2025 wildfires, and to facilitate timely development and permitting of offshore wind and transmission facilities in the state.
(13)The Assembly Select Committee on Permitting Reform issued a report in 2025 documenting the permitting challenges that most projects face trying to navigate the 7 to 12 agencies that have regulatory jurisdiction over resiliency projects. This report recommended eliminating uncertainty in the application process, enhancing interagency coordination and consistency, and creating distinct permitting pathways for drought resilience and flood risk reduction projects.
(b)Given the myriad of benefits from coastal resilience projects to California communities, the Secretary of the Natural Resources Agency shall develop a Coastal Resilience Permitting Roadmap with recommendations for process improvements and legislative reforms that will enable efficient and timely delivery of environmental approvals for these projects, as provided in Section 30991.
30991.(a)(1)The Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, shall convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and in and adjacent to state and federal waters.
(2)The Coastal Resilience Permitting Working Group shall consist of representatives from federal, state, and local agencies, including, but not limited to, representatives from all of the following entities:
(A)The California Coastal Commission.
(B)The California Environmental Protection Agency.
(C)The State Water Resources Control Board and representatives from the Regional Water Quality Control Boards.
(D)The Department of Fish and Wildlife.
(E)The Governors Office of Land Use and Climate Innovation.
(F)The Natural Resources Agency.
(G)The Ocean Protection Council.
(H)The San Francisco Bay Conservation and Development Commission.
(I)The State Coastal Conservancy.
(J)The State Lands Commission.
(K)The State Office of Historic Preservation.
(3)Development of the Coastal Resilience Permitting Roadmap shall incorporate, but not delay, progress to advance responsible permitting and development of coastal resilience projects.
(b)(1)On or before July 1, 2028, the Secretary of the Natural Resources Agency shall submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature.
(2)The plan submitted to the Legislature pursuant to paragraph (1) shall be submitted in compliance with Section 9795 of the Government Code.
(3)Pursuant to Section 10231.5 of the Government Code, this subdivision shall become inoperative on January 1, 2032.
(c)The Coastal Resilience Permitting Roadmap developed pursuant to paragraph (1) of subdivision (a) shall include, at a minimum, recommendations that address all of the following:
(1)Administrative reforms that can be implemented by state agencies, to the extent feasible, within their existing authority to improve permit issuance timelines, including all of the following:
(A)Improving efficiency in the process for agencies to determine and communicate that permit applications are complete, through the use of tools, such as preapplication consultations, publishing clear permit guidelines, minimizing additional information requests when applicants submit complete applications consistent with permit guidelines, and setting timelines for initial and successive reviews.
(B)Unified applications with a predictable sequence and timeline of permitting information requests and interagency reviews.
(C)Statewide or regional interagency project management teams for multiagency permitting, modeled on the Bay Restoration Regulatory Integration Team.
(D)Methods to standardize compensatory mitigation across agencies, as applicable and feasible, including rewarding the consideration of engineering with nature features to enable projects to self-mitigate, and the consideration of types and thresholds for small amounts of fill that may not require mitigation because they may be beneficial or can be shown to have negligible impacts.
(E)Delegating permit issuance to executive officers or using consent calendars when appropriate and applicable.
(F)Expanded use of regional general permits and programmatic agreements for known categories of coastal resilience projects.
(G)Process improvements that allow for permit approval when the design is being developed or is complete, and for permit approval to be maintained during subsequent nonsubstantive design changes arising from field conditions and in-depth engineering analysis.
(H)Standard measures and methods that can be applied to borings, pile driving and fill placement techniques, and other practices that are known to safeguard marine resources, including the types of conditions under which these measures should be utilized and can be scaled to varying project scope and footprint, taking into consideration variability across the ocean floor topographies.
(I)Recommendations for how to expedite and streamline the permitting of projects included in local sea level rise adaptation plans, as required by the Regional Shoreline Adaptation Plan (BPA 1-24) adopted by the San Francisco Bay Conservation and Development Commission and by the Sea Level Rise Policy Guidance adopted by the California Coastal Commission, respectively, as an incentive to complete and implement local plans.
(J)Consideration of project-based permit streamlining.
(2)A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, thereby avoiding temporal loss of habitat and associated increased mitigation requirements, and reducing the need for individual applicants to develop and implement project-specific compensatory mitigation projects.
(3)Legislative reforms that have the greatest potential to further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements that result in extensive analysis that could be avoided by application of standardized compensatory mitigation, as feasible and appropriate, advance mitigation, or standard construction practices, as well as identification of regulatory gaps and frictions that could lead to maladaptation over time.
(4)If needed to test alternative approaches, a coastal resilience project pilot program along with any required legislative authorizations to evaluate the effectiveness of recommended reforms and environmental protection methods.
(5)An evaluation of whether consolidated coastal resilience permits similar to those provided in Division 20 (commencing with Section 30000) for offshore wind projects would facilitate timely permits.
(6)A workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, including a specific analysis of recommended pay scales needed to recruit and retain permitting staff that reflect the educational requirements for these positions, the cost of living in areas where these staff live and work, and private sector compensation for similar skills.
(d)To support deliberations of the Coastal Resilience Permitting Working Group, on or before April 1, 2027, the Secretary of the Natural Resources Agency, in collaboration with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, and the State Water Resources Control Board, and representatives from the Regional Water Quality Control Boards, shall convene a Coastal Resilience Permit Advisory Group. Coastal Resilience Permit Advisory Group membership may include, but not be limited to, representatives of each of the following:
(1)The Department of Transportation, the State Coastal Conservancy, and other relevant state agencies that seek permits for projects in coastal areas.
(2)Local governments subject to the requirements of Division 20.6.9 (commencing with Section 30985).
(3)California ports.
(4)Local transportation agencies, special districts, stormwater management agencies, and wastewater treatment agencies that serve jurisdictions subject to Division 20.6.9 (commencing with Section 30985).
(5)California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission.
(6)Other members of the public, including academics, businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, environmental justice organizations, professional associations, and others.
(e)The Secretary of the Natural Resources Agency, in consultation with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, the State Water Resources Control Board, and representatives from the Regional Water Quality Control Boards, shall conduct a series of public workshops with the Coastal Resilience Permit Advisory Group or subgroups thereof to do all of the following:
(1)Solicit feedback regarding challenges with existing permitting processes, and recommendations and concerns from permittees and other interested parties regarding streamlining proposals.
(2)Review and seek comment on draft reform proposals from the Coastal Resilience Permitting Working Group for potential inclusion in the Coastal Resilience Permitting Roadmap.
(f)When developing infrastructure to address adaptation, where feasible, a project alternative should be developed that uses existing natural features and ecosystem processes, or the restoration of natural features and ecosystem processes, to meet the projects goals.
(g)For purposes of this section, coastal resilience project means a project that maintains, protects, restores, or enables coastal ecosystems, infrastructure, or communities to withstand and adapt to sea level rise and other natural hazards, including those amplified by climate change.
(a)The Legislature finds and declares all of the following:
(1)The Ocean Protection Councils 2024 State of California Sea Level Rise Guidance includes a projection that by the year 2100, statewide averaged sea levels are expected to rise between 1.6 feet and 3.1 feet under the Intermediate-Low and Intermediate Scenarios.
(2)The Ocean Protection Councils guidance also notes that higher amounts of up to 6.6 feet or more of sea level rise in very high risk, low-probability cases cannot be ruled out.
(3)In 2023, the Metropolitan Transportation Commission of the San Francisco Bay area, in consultation with the Association of Bay Area Governments and the San Francisco Bay Conservation and Development Commission, published the Sea Level Rise Adaptation Funding and Investment Framework Final Report with an estimate of one hundred ten billion dollars ($110,000,000,000) to adapt San Francisco Bay communities and critical infrastructure to sea level rise by 2050.
(4)In 2024, the Legislature adopted Division 20.6.9 (commencing with Section 30985) requiring the California Coastal Commission and the San Francisco Bay Conservation and Development Commission to publish guidelines for the preparation of sea level rise plans and for local communities to seek review and approval of these plans by 2034 to remain eligible for resilience funding from the state.
(5)Construction activities along the California coast and in the San Francisco Bay in federal waters are regulated by a wide range of state and federal agencies operating under a comprehensive set of state and federal environmental laws.
(6)California promotes the use of natural infrastructure, where feasible, to build coastal resilience, which is described in Section 71154 as using natural ecological systems or processes to reduce vulnerability to climate change-related hazards, or other related climate change effects, while increasing the long-term adaptive capacity of coastal and inland areas by perpetuating or restoring ecosystem services.
(7)The National Oceanic and Atmospheric Administrations North-Central California Coastal Sediment Coordination Committee published a 2024 Efficient Permitting Roadmap that provides a description of permitting roles for state and federal agencies and preferred approaches for habitat restoration projects.
(8)Together, these laws and the work of these agencies, provide critical protection for the health of the Pacific Ocean and the San Francisco Bay.
(9)The combination of overlapping federal and state authorities, requirements for project-specific studies, limited regulatory agency staffing, interagency coordination needs, and inconsistency and uncertainty regarding mitigation requirements can result in extended permitting timelines for all projects in or adjacent to federal waters, including coastal resilience projects.
(10)Permitting staff positions at relevant agencies require extensive education and experience regarding complex ecosystems and marine environments, and related expertise such as knowledge of historic and cultural resources.
(11)Numerous reports, including the California Coastal Commission 20212025 Workforce Plan, the University of California Berkeley Labor Centers Civil Service Vacancies in California: 20222023, the Central Coast Regional Water Quality Control Boards 2022 Executive Officers Report, and the 2025 National Conference of State Historic Preservation Officers Workforce Report, document the challenge of recruiting and retaining qualified staff to process complicated permit applications.
(12)The Governor and the Legislature have previously addressed permitting timelines and processes related to rebuilding after natural disasters such as the January 2025 wildfires, and to facilitate timely development and permitting of offshore wind and transmission facilities in the state.
(13)The Assembly Select Committee on Permitting Reform issued a report in 2025 documenting the permitting challenges that most projects face trying to navigate the 7 to 12 agencies that have regulatory jurisdiction over resiliency projects. This report recommended eliminating uncertainty in the application process, enhancing interagency coordination and consistency, and creating distinct permitting pathways for drought resilience and flood risk reduction projects.
(b)Given the myriad of benefits from coastal resilience projects to California communities, the Secretary of the Natural Resources Agency shall develop a Coastal Resilience Permitting Roadmap with recommendations for process improvements and legislative reforms that will enable efficient and timely delivery of environmental approvals for these projects, as provided in Section 30991.
30991.(a)(1)The Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, shall convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and in and adjacent to state and federal waters.
(2)The Coastal Resilience Permitting Working Group shall consist of representatives from federal, state, and local agencies, including, but not limited to, representatives from all of the following entities:
(A)The California Coastal Commission.
(B)The California Environmental Protection Agency.
(C)The California State Water Resources Control Board and representatives from the Regional Water Quality Control Boards, San Francisco Bay, North Coast, Central Coast, Los Angeles, Santa Ana, and San Diego. Boards.
(D)The Department of Fish and Wildlife.
(E)The Governors Office of Land Use and Climate Innovation.
(F)The Natural Resources Agency.
(G)The Ocean Protection Council.
(H)The San Francisco Bay Conservation and Development Commission.
(I)The State Coastal Conservancy.
(J)The State Lands Commission.
(K)The State Office of Historic Preservation.
(L)The State Water Resources Control Board.(3)Development of the Coastal Resilience Permitting Roadmap shall incorporate, but not delay, progress to advance responsible permitting and development of coastal resilience projects.
(b)(1)On or before January July 1, 2028, the Secretary of the Natural Resources Agency shall submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature.
(2)The plan submitted to the Legislature pursuant to paragraph (1) shall be submitted in compliance with Section 9795 of the Government Code.
(3)Pursuant to Section 10231.5 of the Government Code, this subdivision shall become inoperative on January 1, 2032.
(c)The Coastal Resilience Permitting Roadmap developed pursuant to paragraph (1) of subdivision (a) shall include, at a minimum, recommendations that address all of the following:
(1)Administrative reforms that can be implemented by state agencies, to the extent feasible, within their existing authority to improve permit issuance timelines, including all of the following:
(A)Improving efficiency in the process for agencies to determine and communicate that permit applications are complete, through the use of tools, such as preapplication consultations, publishing clear permit guidelines, minimizing additional information requests when applicants submit complete applications consistent with permit guidelines, and setting timelines for initial and successive reviews.
(B)Unified applications with a predictable sequence and timeline of permitting information requests and interagency reviews.
(C)Statewide or regional interagency project management teams for multiagency permitting, modeled on the Bay Restoration Regulatory Integration Team.
(D)Methods to standardize compensatory mitigation across agencies, as applicable and feasible, including rewarding the consideration of engineering with nature features to enable projects to self-mitigate, and the consideration of types and thresholds for small amounts of fill that may not require mitigation because they may be beneficial or can be shown to have negligible impacts.
(E)Delegating permit issuance to executive officers or using consent calendars when appropriate and applicable.
(F)Expanded use of regional general permits and programmatic agreements for known categories of coastal resilience projects.
(G)Process improvements that allow for permit approval when the design is being developed or is complete, and for permit approval to be maintained during subsequent nonsubstantive design changes arising from field conditions and in-depth engineering analysis.
(H)Standard measures and methods that can be applied to borings, pile driving and fill placement techniques, and other practices that are known to safeguard marine resources, including the types of conditions under which these measures should be utilized and can be scaled to varying project scope and footprint, taking into consideration variability across the ocean floor topographies.
(I)Recommendations for how to expedite and streamline the permitting of projects included in local sea level rise adaptation plans, as required by the Regional Shoreline Adaptation Plan (BPA 1-24) adopted by the San Francisco Bay Conservation and Development Commission and by the Sea Level Rise Policy Guidance adopted by the California Coastal Commission, respectively, as an incentive to complete and implement local plans.
(J)Consideration of project-based permit streamlining.
(2)A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, thereby avoiding temporal loss of habitat and associated increased mitigation requirements, and reducing the need for individual applicants to develop and implement project-specific compensatory mitigation projects.
(3)Legislative reforms that have the greatest potential to further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements that result in extensive analysis that could be avoided by application of standardized compensatory mitigation, as feasible and appropriate, advance mitigation, or standard construction practices, as well as identification of regulatory gaps and frictions that could lead to maladaptation over time.
(4)If needed to test alternative approaches, a coastal resilience project pilot program along with any required legislative authorizations to evaluate the effectiveness of recommended reforms and environmental protection methods.
(5)An evaluation of whether consolidated coastal resilience permits similar to those provided in Division 20 (commencing with Section 30000) for offshore wind projects would facilitate timely permits.
(6)A workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, including a specific analysis of recommended pay scales needed to recruit and retain permitting staff that reflect the educational requirements for these positions, the cost of living in areas where these staff live and work, and private sector compensation for similar skills.
(d)To support deliberations of the Coastal Resilience Permitting Working Group, on or before April 1, 2027, the Secretary of the Natural Resources Agency, in collaboration with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, and the California Regional Water Quality Control Boards with jurisdiction over the California coast and San Francisco Bay, State Water Resources Control Board, and representatives from the Regional Water Quality Control Boards, shall convene a Coastal Resilience Permit Advisory Group. Coastal Resilience Permit Advisory Group membership shall may include, but not be limited to, representatives of each of the following:
(1)The Department of Transportation, the State Coastal Conservancy, and other relevant state agencies that seek permits for projects in coastal areas.
(2)Local governments subject to the requirements of Division 20.6.9 (commencing with Section 30985).
(3)California ports.
(4)Local transportation agencies, special districts, stormwater management agencies, and wastewater treatment agencies. agencies that serve jurisdictions subject to Division 20.6.9 (commencing with Section 30985).
(5)California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission.
(6)Other members of the public, including academics, businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, environmental justice organizations, professional associations, and others.
(e)The Secretary of the Natural Resources Agency, in consultation with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, and the California Regional Water Quality Control Boards with jurisdiction over the California coast and San Francisco Bay, the State Water Resources Control Board, and representatives from the Regional Water Quality Control Boards, shall conduct a series of public workshops with the Coastal Resilience Permit Advisory Group or subgroups thereof to do all of the following:
(1)Solicit feedback regarding challenges with existing permitting processes, and recommendations and concerns from permittees and other interested parties regarding streamlining proposals.
(2)Review and seek comment on draft reform proposals from the Coastal Resilience Permitting Working Group for potential inclusion in the Coastal Resilience Permitting Roadmap.
(f)When developing infrastructure to address adaptation, where feasible, a project alternative should be developed that uses existing natural features and ecosystem processes, or the restoration of natural features and ecosystem processes, to meet the projects goals.
(g)For purposes of this section, coastal resilience project means a project that maintains, protects, restores, or enables coastal ecosystems, infrastructure, or communities to withstand and adapt to sea level rise and other natural hazards, including those amplified by climate change.
(a)The Legislature finds and declares all of the following:
(1)The Ocean Protection Councils 2024 State of California Sea Level Rise Guidance includes a projection that by the year 2100, statewide averaged sea levels are expected to rise between 1.6 feet and 3.1 feet under the Intermediate-Low and Intermediate Scenarios.
(2)The Ocean Protection Councils guidance also notes that higher amounts of up to 6.6 feet or more of sea level rise in very high risk, low-probability cases cannot be ruled out.
(3)In 2023, the Metropolitan Transportation Commission of the San Francisco Bay area, in consultation with the Association of Bay Area Governments and the San Francisco Bay Conservation and Development Commission, published the Sea Level Rise Adaptation Funding and Investment Framework Final Report with an estimate of one hundred ten billion dollars ($110,000,000,000) to adapt San Francisco Bay communities and critical infrastructure to sea level rise by 2050.
(4)In 2024, the Legislature adopted Division 20.6.9 (commencing with Section 30985) requiring the California Coastal Commission and the San Francisco Bay Conservation and Development Commission to publish guidelines for the preparation of sea level rise plans and for local communities to seek review and approval of these plans by 2034 to remain eligible for resilience funding from the state.
(5)Construction activities along the California coast and in the San Francisco Bay in federal waters are regulated by a wide range of state and federal agencies operating under a comprehensive set of state and federal environmental laws.
(6)California promotes the use of natural infrastructure, where feasible, to build coastal resilience, which is described in Section 71154 as using natural ecological systems or processes to reduce vulnerability to climate change-related hazards, or other related climate change effects, while increasing the long-term adaptive capacity of coastal and inland areas by perpetuating or restoring ecosystem services.
(6)(7)The National Oceanic and Atmospheric Administrations North-Central California Coastal Sediment Coordination Committee published a 2024 Efficient Permitting Roadmap that provides a description of permitting roles for state and federal agencies and preferred approaches for habitat restoration projects.
(7)(8)Together, these laws and the work of these agencies, provide critical protection for the health of the Pacific Ocean and the San Francisco Bay.
(8)(9)The combination of overlapping, and sometimes duplicative, overlapping federal and state authorities, requirements for project-specific studies, limited regulatory agency staffing, interagency coordination needs, and inconsistency and uncertainty regarding mitigation requirements results can result in extended permitting timelines for all projects in or adjacent to federal waters, including coastal resilience projects.
(9)(10)Permitting staff positions at relevant agencies require extensive education and experience regarding complex ecosystems and marine environments, and related expertise such as knowledge of historic and cultural resources.
(10)(11)Numerous reports, including the California Coastal Commission 20212025 Workforce Plan, the University of California Berkeley Labor Centers Civil Service Vacancies in California: 20222023, the Central Coast Regional Water Quality Control Boards 2022 Executive Officers Report, and the 2025 National Conference of State Historic Preservation Officers Workforce Report, document the challenge of recruiting and retaining qualified staff to process complicated permit applications.
(11)(12)The Governor and the Legislature have previously addressed permitting timelines and processes related to rebuilding after natural disasters such as the January 2025 wildfires, and to facilitate timely development and permitting of offshore wind and transmission facilities in the state.
(13)The Assembly Select Committee on Permitting Reform issued a report in 2025 documenting the permitting challenges that most projects face trying to navigate the 7 to 12 agencies that have regulatory jurisdiction over resiliency projects. This report recommended eliminating uncertainty in the application process, enhancing interagency coordination and consistency, and creating distinct permitting pathways for drought resilience and flood risk reduction projects.
(b)Given the myriad of benefits from coastal resilience projects to California communities, the Secretary of the Natural Resources Agency shall develop a Coastal Resilience Permitting Roadmap with recommendations for process improvements and legislative reforms that will enable efficient and timely delivery of environmental approvals for these projects, as provided in Section 30991.
30991.(a)(1)The Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, shall convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and in and adjacent to state and federal waters.
(2)The Coastal Resilience Permitting Working Group shall consist of representatives from federal, state, and local agencies, including, but not limited to, representatives from all of the following entities:
(A)The California Coastal Commission.
(B)The California Environmental Protection Agency.
(C)The California Regional Water Quality Control Boards, San Francisco Bay, North Coast, and Central Coast. Coast, Los Angeles, Santa Ana, and San Diego.
(D)The Department of Fish and Wildlife.
(E)The Governors Office of Land Use and Climate Innovation.
(F)The Natural Resources Agency.
(G)The Ocean Protection Council.
(H)The San Francisco Bay Conservation and Development Commission.
(I)The State Coastal Conservancy.
(J)The State Lands Commission.
(K)The State Office of Historic Preservation.
(L)The State Water Resources Control Board.
(3)Development of the Coastal Resilience Permitting Roadmap shall incorporate, but not delay, progress to advance responsible permitting and development of coastal resilience projects.
(b)(1)On or before January 1, 2028, the Secretary of the Natural Resources Agency shall submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature.
(2)The plan submitted to the Legislature pursuant to paragraph (1) shall be submitted in compliance with Section 9795 of the Government Code.
(3)Pursuant to Section 10231.5 of the Government Code, this subdivision shall become inoperative on January 1, 2032.
(c)The Coastal Resilience Permitting Roadmap developed pursuant to paragraph (1) of subdivision (a) shall include, at a minimum, recommendations that address all of the following:
(1)Administrative reforms that can be implemented by state agencies, to the extent feasible, within their existing authority to improve permit issuance timelines, including all of the following:
(A)Streamlining the process for determinations that applications are complete, including limits on additional information requests when applicants submit complete applications consistent with permit guidelines, and timelines for initial and successive reviews.(A)Improving efficiency in the process for agencies to determine and communicate that permit applications are complete, through the use of tools, such as preapplication consultations, publishing clear permit guidelines, minimizing additional information requests when applicants submit complete applications consistent with permit guidelines, and setting timelines for initial and successive reviews.
(B)Unified applications with a predictable sequence and timeline of permitting information requests and interagency reviews.
(C)Statewide or regional interagency project management teams for multiagency permitting, modeled on the Bay Restoration Regulatory Integration Team.
(D)Methods to standardize compensatory mitigation across agencies, as applicable and feasible, including rewarding the consideration of engineering with nature features to enable projects to self-mitigate and a potential de minimis fill policy that allows de minimis fill within defined thresholds without the need to mitigate. self-mitigate, and the consideration of types and thresholds for small amounts of fill that may not require mitigation because they may be beneficial or can be shown to have negligible impacts.
(E)Delegating permit issuance to executive officers or using consent calendars when appropriate and applicable.
(F)Expanded use of regional general permits and programmatic agreements for known categories of coastal resilience projects.
(G)Process improvements that allow for permit approval when the design is being developed or is complete or during the preapplication process, complete, and for permit approval to be maintained during subsequent nonsubstantive design changes arising from field conditions and in-depth engineering analysis.
(H)Standard measures and methods that can be applied to borings, pile driving and fill placement techniques, and other practices that are known to safeguard marine resources, including the types of conditions under which these measures should be utilized and can be scaled to varying project scope and footprint, taking into consideration variability across the ocean floor topographies.
(I)Recommendations for how to expedite and streamline the permitting of projects included in local sea level rise adaptation plans, as required by the Regional Shoreline Adaptation Plan (BPA 1-24) adopted by the San Francisco Bay Conservation and Development Commission and by the Sea Level Rise Policy Guidance adopted by the California Coastal Commission, respectively, as an incentive to complete and implement local plans.
(J)Consideration of project-based permit streamlining.
(2)A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, thereby avoiding temporal loss of habitat and associated increased mitigation requirements, and reducing the need for individual applicants to develop and implement project-specific compensatory mitigation projects.
(3)Legislative reforms that have the greatest potential to further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements that result in extensive analysis that could be avoided by application of standardized compensatory mitigation, as feasible and appropriate, advance mitigation, or standard construction practices, as well as identification of regulatory gaps and frictions that could lead to maladaptation over time.
(4)If needed to test alternative approaches, a coastal resilience project pilot program along with any required legislative authorizations to evaluate the effectiveness of recommended reforms and environmental protection. protection methods.
(5)An evaluation of whether consolidated coastal resilience permits similar to those provided in Division 20 (commencing with Section 30000) for offshore wind projects would facilitate timely permits.
(6)A workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, including a specific analysis of recommended pay scales needed to recruit and retain permitting staff that reflect the educational requirements for these positions, the cost of living in areas where these staff live and work, and private sector compensation for similar skills.
(d)To support deliberations of the Coastal Resilience Permitting Working Group, on or before April 1, 2027, the Secretary of the Natural Resources Agency, in collaboration with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, and the California Regional Water Quality Control Boards with jurisdiction over the California coast and San Francisco Bay, shall convene a Coastal Resilience Permit Advisory Group. Coastal Resilience Permit Advisory Group membership shall include, but not be limited to, representatives of each of the following:
(1)The Department of Transportation, the State Coastal Conservancy, and other relevant state agencies that seek permits for projects in coastal areas.
(2)Local governments subject to the requirements of Division 20.6.9 (commencing with Section 30985).
(3)California ports.
(4)Local transportation agencies agencies, special districts, stormwater management agencies, and wastewater treatment agencies.
(5)California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission.
(6)Other members of the public, including academics, businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, environmental justice organizations, professional associations, and others.
(e)The Secretary of the Natural Resources Agency, in consultation with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, and the California Regional Water Quality Control Boards with jurisdiction over the California coast and San Francisco Bay, shall conduct a series of public workshops with the Coastal Resilience Permit Advisory Group or subgroups thereof to do all of the following:
(1)Solicit feedback regarding challenges with existing permitting processes, and recommendations and concerns from permittees and other interested parties regarding streamlining proposals.
(2)Review and seek comment on draft reform proposals from the Coastal Resilience Permitting Working Groups Group for potential inclusion in the Coastal Resilience Permitting Roadmap.
(f)When developing infrastructure to address adaptation, where feasible, a project alternative should be developed that uses existing natural features and ecosystem processes, or the restoration of natural features and ecosystem processes, to meet the projects goals.
(f)(g)For purposes of this section, coastal resilience project means a project that maintains, protects, restores, or enables coastal ecosystems, infrastructure, or communities to withstand and adapt to sea level rise and other natural hazards hazards, including those amplified by climate change.
(a)The Legislature finds and declares all of the following:
(1)The Ocean Protection Councils 2024 State of California Sea Level Rise Guidance includes a projection that by the year 2100, statewide averaged sea levels are expected to rise between 1.6 feet and 3.1 feet under the Intermediate-Low and Intermediate Scenarios.
(2)The Ocean Protection Councils guidance also notes that higher amounts of up to 6.6 feet or more of sea level rise in very high risk, low-probability cases cannot be ruled out.
(3)In 2023, the Metropolitan Transportation Commission of the San Francisco Bay area, in consultation with the Association of Bay Area Governments and the San Francisco Bay Conservation and Development Commission, published the Sea Level Rise Adaptation Funding and Investment Framework Final Report with an estimate of one hundred ten billion dollars ($110,000,000,000) to adapt San Francisco Bay communities and critical infrastructure to sea level rise by 2050.
(4)In 2024, the Legislature adopted Division 20.6.9 (commencing with Section 30985) requiring the California Coastal Commission and the San Francisco Bay Conservation and Development Commission to publish guidelines for the preparation of sea level rise plans and for local communities to seek review and approval of these plans by 2034 to remain eligible for resilience funding from the state.
(5)Construction activities along the California coast and in the San Francisco Bay in federal waters are regulated by a wide range of state and federal agencies operating under a comprehensive set of state and federal environmental laws.
(6)The National Oceanic and Atmospheric Administrations North-Central California Coastal Sediment Coordination Committee published a 2024 Efficient Permitting Roadmap that provides a description of permitting roles for state and federal agencies and preferred approaches for habitat restoration projects.
(7)Together, these laws and the work of these agencies, provide critical protection for the health of the Pacific Ocean and the San Francisco Bay.
(8)The combination of overlapping, and sometimes duplicative, federal and state authorities, requirements for project-specific studies, limited regulatory agency staffing, interagency coordination needs, and inconsistency and uncertainty regarding mitigation requirements results in extended permitting timelines for all projects in or adjacent to federal waters, including coastal resilience projects.
(9)Permitting staff positions at relevant agencies require extensive education and experience regarding complex ecosystems and marine environments, and related expertise such as knowledge of historic and cultural resources.
(10)Numerous reports, including the California Coastal Commission 20212025 Workforce Plan, the University of California Berkeley Labor Centers Civil Service Vacancies in California: 20222023, the Central Coast Regional Water Quality Control Boards 2022 Executive Officers Report, and the 2025 National Conference of State Historic Preservation Officers Workforce Report, document the challenge of recruiting and retaining qualified staff to process complicated permit applications.
(11)The Governor and the Legislature have previously addressed permitting timelines and processes related to rebuilding after natural disasters such as the January 2025 wildfires, and to facilitate timely development and permitting of offshore wind and transmission facilities in the state.
(b)Given the myriad of benefits from coastal resilience projects to California communities, the Secretary of the Natural Resources Agency shall develop a Coastal Resilience Permitting Roadmap with recommendations for process improvements and legislative reforms that will enable efficient and timely delivery of environmental approvals for these projects, as provided in Section 30991.
30991.(a)(1)The Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, shall convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and in and adjacent to state and federal waters.
(2)The Coastal Resilience Permitting Working Group shall consist of representatives from federal, state, and local agencies, including, but not limited to, representatives from all of the following entities:
(A)The California Coastal Commission.
(B)The California Environmental Protection Agency.
(C)The California Regional Water Quality Control Boards, San Francisco Bay, North Coast, and Central Coast.
(D)The Department of Fish and Wildlife.
(E)The Governors Office of Land Use and Climate Innovation.
(F)The Natural Resources Agency.
(G)The Ocean Protection Council.
(H)The San Francisco Bay Conservation and Development Commission.
(I)The State Coastal Conservancy.
(J)The State Historical Resources Commission. (K)(J)The State Lands Commission.
(L)(K)The State Office of Historic Preservation.
(M)(L)The State Water Resources Control Board.
(3)Development of the Coastal Resilience Permitting Roadmap shall incorporate, but not delay, progress to advance responsible permitting and development of coastal resilience projects.
(b)(1)On or before January 1, 2028, the Secretary of the Natural Resources Agency shall submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature.
(2)The plan submitted to the Legislature pursuant to paragraph (1) shall be submitted in compliance with Section 9795 of the Government Code.
(3)Pursuant to Section 10231.5 of the Government Code, this subdivision shall become inoperative on January 1, 2032.
(c)The Coastal Resilience Permitting Roadmap developed pursuant to paragraph (1) of subdivision (a) shall include, at a minimum, recommendations that address all of the following:
(1)Administrative reforms that can be implemented by state agencies agencies, to the extent feasible, within their existing authority to improve permit issuance timelines, including all of the following:
(A)Streamlining the process for determinations that applications are complete, including limits on additional information requests when applicants submit complete applications consistent with permit guidelines, and timelines for initial and successive reviews.
(B)Unified applications with a predictable sequence and timeline of permitting information requests and interagency reviews.
(C)An Statewide or regional interagency project management team teams for multiagency permitting, modeled on the Bay Restoration Regulatory Integration Team.
(D)Methods to standardize compensatory mitigation across agencies, including use consideration of engineering with nature features to enable projects to self-mitigate and a potential de minimis fill policy that allows de minimis fill within defined thresholds without the need to mitigate.
(E)Delegating permit issuance to executive officers or using consent calendars when commission or board action is required by law. appropriate and applicable.
(F)Expanded use of regional general permits and programmatic agreements for known categories of coastal resilience projects.
(G)Process improvements that allow for permit approval earlier in the design process, when the design is complete or during the preapplication process, and for subsequent design changes arising from field conditions and in-depth engineering analysis.
(H)Standard measures that can be applied to pile driving and fill placement techniques, and other practices that are known to safeguard marine resources, including the types of conditions under which these measures should be utilized and can be scaled to varying project scope and footprint. footprint, taking into consideration variability across the ocean floor topographies.
(I)Recommendations for how to expedite and streamline the permitting of projects included in local sea level rise adaptation plans, as required by the Regional Shoreline Adaptation Plan (BPA 1-24) adopted by the San Francisco Bay Conservation and Development Commission and by the Sea Level Rise Policy Guidance adopted by the California Coastal Commission, respectively, as an incentive to complete and implement local plans.
(J)Consideration of project-based permit streamlining.
(2)A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, thereby avoiding temporal loss of habitat and associated increased mitigation requirements, and reducing the need for individual applicants to develop and implement project-specific compensatory mitigation projects.
(3)Legislative reforms that can have the greatest potential to further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements that result in extensive analysis that could be avoided by application of standardized compensatory mitigation, advance mitigation, or standard construction practices. practices, as well as identification of regulatory gaps and frictions that could lead to maladaptation over time.
(4)If needed to test alternative approaches, a coastal resilience project pilot program along with any required legislative authorizations to evaluate the effectiveness of recommended reforms and environmental protection.
(5)An evaluation of whether consolidated coastal resilience permits similar to those provided in Division 20 (commencing with Section 30000) for offshore wind projects would facilitate timely permits.
(6)A workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, including a specific analysis of recommended pay scales needed to recruit and retain permitting staff that reflect the educational requirements for these positions, the cost of living in areas where these staff live and work, and private sector compensation for similar skills.
(d)To support deliberations of the Coastal Resilience Permitting Working Group, on or before April 1, 2027, the Secretary of the Natural Resources Agency, in collaboration with the California Coastal Commission and Commission, the San Francisco Bay Conservation and Development Commission, in collaboration with the Department of Fish and Wildlife, and the California Regional Water Quality Control Boards with jurisdiction over the California coast and San Francisco Bay, shall convene a Coastal Resilience Permit Advisory Group. Coastal Resilience Permit Advisory Group membership shall include, but not be limited to, representatives of each of the following:
(1)The Department of Transportation, the State Coastal Conservancy, and other relevant state agencies that seek permits for projects in coastal areas.
(2)Local governments subject to the requirements of Division 20.6.9 (commencing with Section 30895). 30985).
(3)California ports.
(4)Local transportation agencies and wastewater treatment agencies.
(5)California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission.
(6)Other members of the public, including businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, environmental justice organizations, and others.
(e)The Secretary of the Natural Resources Agency, in consultation with the California Coastal Commission and Commission, the San Francisco Bay Conservation and Development Commission, in consultation with the Department of Fish and Wildlife, and the California Regional Water Quality Control Boards with jurisdiction over the California coast and San Francisco Bay, shall conduct a series of public workshops with the Coastal Resilience Permit Advisory Group or subgroups thereof to do all of the following:
(1)Solicit feedback regarding challenges with existing permitting processes, and recommendations and concerns from permittees and other interested parties regarding streamlining proposals.
(2)Review and seek comment on draft reform proposals from the Coastal Resilience Permitting Working Groups Coastal Resilience Permitting Roadmap.
(f)For purposes of this section, coastal resilience project means a project that maintains, protects, restores, or enables coastal ecosystems, infrastructure, or communities to withstand and adapt to sea level rise and other natural hazards amplified by climate change.
REVISIONS: HeadingLine 2.(a)The Legislature finds and declares all of the following:
(1)The Ocean Protection Councils 2024 State of California Sea Level Rise Guidance includes a projection that by the year 2100, statewide averaged sea levels are expected to rise between 1.6 feet and 3.1 feet under the Intermediate-Low and Intermediate Scenarios.
(2)The Ocean Protection Councils guidance also notes that higher amounts of up to 6.6 feet or more of sea level rise in very high risk, low-probability cases cannot be ruled out.
(3)In 2023, the Metropolitan Transportation Commission of the San Francisco Bay area, in consultation with the Association of Bay Area Governments and the San Francisco Bay Conservation and Development Commission, published the Sea Level Rise Adaptation Funding and Investment Framework Final Report with an estimate of one hundred ten billion dollars ($110,000,000,000) to adapt San Francisco Bay communities and critical infrastructure to sea level rise by 2050.
(4)In 2024, the Legislature adopted Division 20.6.9 (commencing with Section 30985) requiring the California Coastal Commission and the San Francisco Bay Conservation and Development Commission to publish guidelines for the preparation of sea level rise plans and for local communities to seek review and approval of these plans by 2034 to remain eligible for resilience funding from the state.
(5)Construction activities along the California coast and in the San Francisco Bay in federal waters are regulated by a wide range of state and federal agencies operating under a comprehensive set of state and federal environmental laws.
(6)The National Oceanic and Atmospheric Administrations North-Central California Coastal Sediment Coordination Committee published a 2024 Efficient Permitting Roadmap that provides a description of permitting roles for state and federal agencies and preferred approaches for habitat restoration projects.
(7)Together, these laws and the work of these agencies, provide critical protection for the health of the Pacific Ocean and the San Francisco Bay.
(8)The combination of overlapping, and sometimes duplicative, federal and state authorities, requirements for project-specific studies, limited regulatory agency staffing, interagency coordination needs, and inconsistency and uncertainty regarding mitigation requirements results in extended permitting timelines for all projects in or adjacent to federal waters, including coastal resilience projects.
(9)Permitting staff positions at relevant agencies require extensive education and experience regarding complex ecosystems and marine environments, and related expertise such as knowledge of historic and cultural resources.
(10)Numerous reports, including the California Coastal Commission 20212025 Workforce Plan, the University of California Berkeley Labor Centers Civil Service Vacancies in California: 20222023, the Central Coast Regional Water Quality Control Boards 2022 Executive Officers Report, and the 2025 National Conference of State Historic Preservation Officers Workforce Report, document the challenge of recruiting and retaining qualified staff to process complicated permit applications.
(11)The Governor and the Legislature have previously addressed permitting timelines and processes related to rebuilding after natural disasters such as the January 2025 wildfires, and to facilitate timely development and permitting of offshore wind and transmission facilities in the state.
(b)Given the myriad of benefits from coastal resilience projects to California communities, the Secretary of the Natural Resources Agency shall develop a Coastal Resilience Permitting Roadmap with recommendations for process improvements and legislative reforms that will enable efficient and timely delivery of environmental approvals for these projects, as provided in Section 30991.
30991.(a)(1)The Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, shall convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and in and adjacent to state and federal waters.
(2)The Coastal Resilience Permitting Working Group shall consist of representatives from federal, state, and local agencies, including, but not limited to, representatives from all of the following entities:
(A)The California Coastal Commission.
(B)The California Environmental Protection Agency.
(C)The California Regional Water Quality Control Boards, San Francisco Bay, North Coast, and Central Coast.
(D)The Department of Fish and Wildlife.
(E)The Governors Office of Land Use and Climate Innovation.
(F)The Natural Resources Agency.
(G)The Ocean Protection Council.
(H)The San Francisco Bay Conservation and Development Commission.
(I)The State Coastal Conservancy.
(J)The State Historical Resources Commission.
(K)The State Lands Commission.
(L)The State Office of Historic Preservation.
(M)The State Water Resources Control Board.
(3)Development of the Coastal Resilience Permitting Roadmap shall incorporate, but not delay, progress to advance responsible permitting and development of coastal resilience projects.
(b)(1)On or before January 1, 2028, the Secretary of the Natural Resources Agency shall submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature.
(2)The plan submitted to the Legislature pursuant to paragraph (1) shall be submitted in compliance with Section 9795 of the Government Code.
(3)Pursuant to Section 10231.5 of the Government Code, this subdivision shall become inoperative on January 1, 2032.
(c)The Coastal Resilience Permitting Roadmap developed pursuant to paragraph (1) of subdivision (a) shall include, at a minimum, recommendations that address all of the following:
(1)Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including all of the following:
(A)Streamlining the process for determinations that applications are complete, including limits on additional information requests and timelines for initial and successive reviews.
(B)Unified applications with a predictable sequence and timeline of permitting information requests and interagency reviews.
(C)An interagency project management team for multiagency permitting, modeled on the Bay Restoration Regulatory Integration Team.
(D)Methods to standardize compensatory mitigation across agencies, including use of engineering with nature features to enable projects to self-mitigate and a de minimis fill policy that allows de minimis fill within defined thresholds without the need to mitigate.
(E)Delegating permit issuance to executive officers or using consent calendars when commission or board action is required by law.
(F)Expanded use of regional general permits and programmatic agreements for known categories of coastal resilience projects.
(G)Process improvements that allow for permit approval earlier in the design process, and for subsequent design changes arising from field conditions and in-depth engineering analysis.
(H)Standard measures that can be applied to pile driving and fill placement techniques, and other practices that are known to safeguard marine resources, including the types of conditions under which these measures should be utilized and can be scaled to varying project scope and footprint.
(2)A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, thereby avoiding temporal loss of habitat and associated increased mitigation requirements, and reducing the need for individual applicants to develop and implement project-specific compensatory mitigation projects.
(3)Legislative reforms that can further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements that result in extensive analysis that could be avoided by application of standardized compensatory mitigation, advance mitigation, or standard construction practices.
(4)If needed to test alternative approaches, a coastal resilience project pilot program along with any required legislative authorizations to evaluate the effectiveness of recommended reforms and environmental protection.
(5)An evaluation of whether consolidated coastal resilience permits similar to those provided in Division 20 (commencing with Section 30000) for offshore wind projects would facilitate timely permits.
(6)A workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, including a specific analysis of recommended pay scales needed to recruit and retain permitting staff that reflect the educational requirements for these positions, the cost of living in areas where these staff live and work, and private sector compensation for similar skills.
(d)To support deliberations of the Coastal Resilience Permitting Working Group, on or before April 1, 2027, the California Coastal Commission and the San Francisco Bay Conservation and Development Commission, in collaboration with the Department of Fish and Wildlife, and the California Regional Water Quality Control Boards with jurisdiction over the California coast and San Francisco Bay, shall convene a Coastal Resilience Permit Advisory Group. Coastal Resilience Permit Advisory Group membership shall include, but not be limited to, representatives of each of the following:
(1)The Department of Transportation, the State Coastal Conservancy, and other relevant state agencies that seek permits for projects in coastal areas.
(2)Local governments subject to the requirements of Division 20.6.9 (commencing with Section 30895).
(3)California ports.
(4)Local transportation agencies and wastewater treatment agencies.
(5)California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission.
(6)Other members of the public, including businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, environmental justice organizations, and others.
(e)The California Coastal Commission and the San Francisco Bay Conservation and Development Commission, in consultation with the Department of Fish and Wildlife, and the California Regional Water Quality Control Boards with jurisdiction over the California coast and San Francisco Bay, shall conduct a series of public workshops with the Coastal Resilience Permit Advisory Group or subgroups thereof to do all of the following:
(1)Solicit feedback regarding challenges with existing permitting processes, and recommendations and concerns from permittees and other interested parties regarding streamlining proposals.
(2)Review and seek comment on draft reform proposals from the Coastal Resilience Permitting Working Groups Coastal Resilience Permitting Roadmap.
|
Date
|
Status
|
|---|---|
| Sep 27, 2026 | Chaptered by Secretary of State - Chapter 575, Statutes of 2026. |
| Sep 27, 2026 | Approved by the Governor. |
| Sep 8, 2026 | Enrolled and presented to the Governor at 3:30 p.m. |
| Aug 28, 2026 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 67. Noes 6. Page 6814.). |
| Aug 28, 2026 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 67. Noes 6.). |
| Aug 27, 2026 | In Assembly. Concurrence in Senate amendments pending. |
| Aug 27, 2026 | Read third time. Passed. Ordered to the Assembly. (Ayes 40. Noes 0. Page 5993.). |
| Aug 27, 2026 | Read third time. Passed. Ordered to the Assembly. (Ayes 39. Noes 0.). |
| Aug 25, 2026 | From committee: That the measure be returned to Senate Floor for consideration. (Ayes 7. Noes 0.) (August 25) |
| Aug 24, 2026 | From committee: Be re-referred to Com. on N.R. & W. pursuant to Senate Rule 29.10 (b). (Ayes 5. Noes 0.) Re-referred to Com. on N.R. & W. |
| Aug 24, 2026 | Re-referred to Com. on RLS. pursuant to Senate Rule 29.10 (b). |
| Aug 24, 2026 | Read second time. Ordered to third reading. |
| Aug 21, 2026 | Read third time and amended. Ordered to second reading. |
| Aug 17, 2026 | Read second time. Ordered to third reading. |
| Aug 13, 2026 | Read second time and amended. Ordered returned to second reading. |
| Aug 13, 2026 | From committee: Amend, and do pass as amended. (Ayes 7. Noes 0.) (August 13). |
| Aug 3, 2026 | In committee: Referred to APPR. suspense file. |
| Jul 6, 2026 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 6, 2026 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 7. Noes 0.) (July 1). |
| Jun 10, 2026 | Referred to Com. on N.R. & W. |
| Jun 1, 2026 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 28, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 65. Noes 6. Page 5525.) |
| May 28, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 65. Noes 6.) |
| May 18, 2026 | Read second time. Ordered to third reading. |
| May 14, 2026 | Coauthors revised. |
| May 14, 2026 | From committee: Do pass. (Ayes 12. Noes 2.) (May 14). |
| Apr 29, 2026 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| Apr 15, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 12. Noes 0.) (April 14). Re-referred to Com. on APPR. |
| Mar 26, 2026 | Re-referred to Com. on W., P., & W. |
| Mar 25, 2026 | Read second time and amended. |
| Mar 24, 2026 | From committee: Amend, and do pass as amended and re-refer to Com. on W., P., & W. (Ayes 12. Noes 1.) (March 23). |
| Mar 9, 2026 | Referred to Coms. on NAT. RES. and W., P., & W. |
| Feb 19, 2026 | From printer. May be heard in committee March 21. |
| Feb 18, 2026 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 28, 2026 | AB 2051 Wicks Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Aug 27, 2026 | Assembly 3rd Reading AB2051 Wicks et al. By Pérez | Senate Floor |
Passed |
|
| Aug 25, 2026 | That the measure be returned to Senate Floor for consideration. Ordered to third reading. | Senate Standing Committee on Natural Resources and Water |
Passed |
|
| Aug 13, 2026 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| Aug 3, 2026 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jul 1, 2026 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Natural Resources and Water |
Passed |
|
| May 28, 2026 | AB 2051 Wicks Assembly Third Reading | Assembly Floor |
Passed |
|
| May 14, 2026 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 14, 2026 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Water, Parks, and Wildlife |
Passed |
|
| Mar 23, 2026 | Do pass as amended and be re-referred to the Committee on [Water, Parks, and Wildlife] | Assembly Standing Committee on Natural Resources |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Abundant Housing LA | ** Support | |
| Act-La | ** Support | |
| AltaSea | ** Support | |
| Association of California Cities – Orange County | ** Support | |
| Bay Area Council | ** Support | |
| Bay Area Council (co-source) | ** Support | |
| Bay Planning Coalition | ** Support | |
| Bay Planning Coalition (co-source) | ** Support | |
| California Broadband & Video Association | ** Support | |
| California Coastal Protection Network | ** Support | |
| California Council For Affordable Housing | ** Support | |
| California Democratic Party Rural Caucus | ** Support | |
| California Shore & Beach Preservation Association | ** Support | |
| California State Association Of Counties | ** Support | |
| CD 11 Coalition for Human Rights | ** Support | |
| City and County of San Francisco | ** Support | |
| City/County Association of Governments of San Mateo County | ** Support | |
| City of Los Alamitos | ** Support | |
| City of Oceanside | ** Support | |
| City of Port Hueneme | ** Support | |
| City of San Rafael | ** Support | |
| Coastal Quest | ** Support | |
| County Of Los Angeles | ** Support | |
| County of Marin | ** Support | |
| County of Monterey | ** Support | |
| County of Orange | ** Support | |
| Downtown Women’s Center | ** Support | |
| East Bay Dischargers Authority | ** Support | |
| East Bay Regional Park District | ** Support | |
| Econcrete | ** Support | |
| Enterprise Community Partners | ** Support | |
| EXPLORATORIUM, THE | ** Support | |
| Filoli | ** Support | |
| Ground Game LA | ** Support | |
| Hollywood Community Housing Corporation | ** Support | |
| Homes & Hope | ** Support | |
| Housing Action Coalition | ** Support | |
| Indivisible South Bay LA | ** Support | |
| Inner City Law Center | ** Support | |
| Kiewit Infrastructure West Co. | ** Support | |
| KIEWIT INFRASTRUCTURE WEST COMPANY | ** Support | |
| la forward | ** Support | |
| Legal Aid Foundation of Los Angeles | ** Support | |
| Long Beach Forward | ** Support | |
| Los Angeles Alliance for a New Economy | ** Support | |
| LOS ANGELES COUNTY YOUNG DEMOCRATS | ** Support | |
| Marin Community Foundation | ** Support | |
| Mar Vista Voice | ** Support | |
| McFadden Finch Holdings Company | ** Support | |
| mental health advocacy services | ** Support | |
| National Alliance to End Homelessness | ** Support | |
| Neighborhood Legal Services | ** Support | |
| One Shoreline | ** Support | |
| Orange County Council of Governments | ** Support | |
| Orange County Transportation Authority | ** Support | |
| Planning And Conservation League | ** Support | |
| Port of Redwood City | ** Support | |
| Port of San Francisco | ** Support | |
| Public Advocates | ** Support | |
| Public Counsel | ** Support | |
| Public Interest Law Project | ** Support | |
| Safe Place For Youth | ** Support | |
| Saje | ** Support | |
| San Francisco Bay Ferry | ** Support | |
| San Francisco International Airport | ** Support | |
| San Mateo County Flood and Sea Level Rise Resiliency District | ** Support | |
| Santa Clara Valley Water District | ** Support | |
| Save The Bay | ** Support | |
| Self-Help Enterprises | ** Support | |
| Senior Advocacy Network | ** Support | |
| Social Justice Learning Institute | ** Support | |
| South Bay Housing Crisis Working Group | ** Support | |
| Southern California Association of Non-Profit Housing | ** Support | |
| SPUR Bay Area | ** Support | |
| Supportive Housing Alliance | ** Support | |
| The Exploratorium | ** Support | |
| The Honorable Todd Gloria, Mayor, City of San Diego | ** Support | |
| The Nature Conservancy | ** Support | |
| T.R.U.S.T. South LA | ** Support | |
| Union Station Homeless Services | ** Support | |
| USC Gould School of Law Housing Law and Policy Clinic | ** Support | |
| Venice Community Housing | ** Support | |
| Wareham Development | ** Support | |
| Wareham Development | ** Support | |
| Wareham Development | ** Support | |
| western center on law and poverty | ** Support | |
| WESTSIDE YOUNG DEMOCRATS | ** Support | |
| Wildcoast | ** Support | |
| Women Organizing Resources, Knowledge and Services | ** Support |
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 2051
Author:(Wicks)
As Amended Ver:August 21, 2026
Majority vote
SUMMARY
Requires the Secretary of the California Natural Resources Agency (NRA) to convene a Coastal Resilience Permitting Working Group (Working Group) for the purpose of developing a Coastal Resilience Permitting Roadmap (Roadmap) to accelerate coastal resilience projects.
Senate Amendments
- Replace, in the Working Group membership list, the entry naming the California Regional Water Quality Control Boards for San Francisco Bay, North Coast, Central Coast, Los Angeles, Santa Ana, and San Diego with an entry naming the State Water Resources Control Board and representatives from the Regional Water Quality Control Boards.
- Modify the Roadmap recommendations.
- Extend the deadline for the Secretary of NRA to submit the Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature from January 1, 2028, to July 1, 2028.
- Replace, among the entities with which the Secretary convenes the Coastal Resilience Permit Advisory Group (Advisory Group), the California Regional Water Quality Control Boards with jurisdiction over the California coast and San Francisco Bay with the State Water Resources Control Board and representatives from the Regional Water Quality Control Boards.
- Provide that Advisory Group membership may, rather than shall, include the listed representatives.
- Narrow the wastewater treatment agencies in the Advisory Group membership list to agencies that serve jurisdictions subject to Division 20.6.9.
- Make the same water boards substitution in the provision requiring the Secretary to conduct public workshops with the Advisory Group.
- Authorize, for good cause, the California Coastal Commission to retroactively extend, for a period not to exceed five years, any time limitation established for a local government to act on the Commission’s suggested modifications to a land use plan amendment that would authorize approval of a 100% affordable housing development.
- Modify the findings and declarations.
COMMENTS
In 2024, the Select Committee on Permit Reform met to discuss permit challenges and permit process reform for infill housing, clean energy, transit, and climate resiliency projects. The resultant California Assembly Select Committee on Permitting Reform Final Report (March 2025) notes that despite permit reforms already undertaken, many stakeholders expressed concern that further permitting reform is necessary for the state to achieve its housing production goals, such as eliminating uncertainty in the application process; minimizing uncertainty in the entitlement process; creating more consistency across permitting entities; focusing on the California Environmental Quality Act and environmental issues; and, minimizing uncertainty for post-entitlement permits.
The report identified best practices for permitting reform, including prioritizing agency objectives and workload, providing a clear and straightforward permit application process, and establishing specific timeframes for reviewing permits.
AB 2051 requires NRA to convene a Working Group to develop a Roadmap for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and make recommendations on myriad administrative reforms and alignment of agency requirements to streamline permitting processes and timeframes.
Numerous recent reports completed by agencies participating in the Working Group and/or Advisory Group have been published with recommendations to streamline the permitting process for coastal development projects. These reports can both inform the Roadmap and eliminate unnecessary redundancies in the Working Group’s efforts.
According to the Author
The communities most at risk from climate change are disproportionately low-income and communities of color, located in low-lying areas adjacent to San Francisco Bay and the Pacific coast, with limited resources to self-finance adaptation. Every year of permitting delay is a year these communities remain exposed to harm they did not cause and cannot afford to absorb. AB 2051 would outline a process that could help accelerate the delivery of flood protection, wetland restoration, and shoreline adaptation infrastructure to the people who need it most…The bill’s Coastal Resilience Permit Advisory Group is specifically charged with ensuring that streamlining efforts do not weaken protections for fish and wildlife habitat, tribal cultural resources, or public access.
Arguments in Support
California State Association of Counties writes that delivering needed climate resilience projects quickly and responsibly is essential. Unfortunately, California’s current coastal permitting system is often fragmented and unpredictable, slowing urgently needed adaptation efforts and increasing costs, as illustrated by the California State Assembly Select Committee on Permitting Reform’s final report. AB 2051 takes a thoughtful and collaborative approach to addressing these challenges.
Arguments in Opposition
None on file
FISCAL COMMENTS
According to the Senate Appropriations Committee:
- One-time costs, likely in the high hundreds of thousands of dollars spread over two to three years (General Fund) for NRA to facilitate interagency collaboration, public workshops, development of the Roadmap, and other deliverables required by the bill.
- One-time costs, likely in the low millions of dollars spread over two to three years (General Fund) for the California Coastal Commission estimates to help develop relevant components of the Roadmap, including recommendations across 10 topic areas, new state agency mitigation processes, proposed legislative reforms, alternatives analyses, evaluation of the efficacy of offshore wind project permitting practices, and more.
- Unknown but significant ongoing costs, possibly in the millions of dollars annually (General Fund, Waste Discharge Permit Fund, or other fund) for the State Water Board and Regional Water Boards to support state and regional board participation in the creation of Coastal Resilience Permitting Roadmap, including expansive subject matter expertise, developing recommendations, participating in statewide public workshops, providing legal consultation, and ensuring the necessary internal operational support to carry out the bill’s provisions. In addition, the State Water Board anticipates that the scale of the required implementable solutions required by this bill’s provisions would have significant costs ongoing, with significant information technology resources required to develop unified applications on a statewide or regional scale.
- Ongoing costs, likely around $1 million annually (General Fund), for the San Francisco Bay Conservation and Development Commission.(BCDC) to assist with development of the Roadmap and implement reforms identified by the Working Group. BCDC notes that without additional positions and contracting resources, BCDC may need to utilize its existing permitting staff and its regulatory improvements team to implement this bill, thereby increasing permitting timelines and delaying implementation of BCDC’s preexisting efforts to improve permitting processes.
- One-time costs, likely less than $1 million spread over three to four years (General Fund), for the California Department of Fish and Wildlife (CDFW) to organize input from the department’s coastal regions (specifically, regions one, three, four, five, and seven); participate in the Working Group, Advisory Group, and public workshops; and assist with the development and review of the Roadmap.
- One-time costs, likely less than $1 million spread over three to four years (General Fund), for the California Environmental Protection Agency (CalEPA) to consult with the members of the Working Group to collaborate on the drafting and recommendations to be included in the Roadmap.
- One-time costs, likely less than $1 million spread over three to four years (General Fund), for the California Department of Transportation (CalTrans) to consultant services to participate in the Advisory Group, participate in public workshops, and assist with the development and review of the Roadmap and legislative reforms resulting from recommendations made in the Roadmap.
VOTES:
ASM NATURAL RESOURCES: 12-1-1
YES: Bryan, Alanis, Connolly, Garcia, Haney, Hoover, Kalra, Muratsuchi, Pellerin, Schultz, Wicks, Zbur
NO: Macedo
ABS, ABST OR NV: Ellis
ASM WATER, PARKS, AND WILDLIFE: 12-0-1
YES: Papan, Jeff Gonzalez, Alanis, Alvarez, Ávila Farías, Bains, Bennett, Boerner, Caloza, Hart, Muratsuchi, Rogers
ABS, ABST OR NV: Gallagher
ASM APPROPRIATIONS: 12-2-1
YES: Wicks, Hoover, Aguiar-Curry, Calderon, Caloza, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache
NO: Dixon, Tangipa
ABS, ABST OR NV: Ta
ASSEMBLY FLOOR: 65-6-9
YES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Chen, Connolly, Davies, Elhawary, Fong, Gabriel, Gallagher, Garcia, Gipson, Jeff Gonzalez, Mark González, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Pellerin, Petrie-Norris, Ramos, Ransom, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NO: DeMaio, Dixon, Johnson, Macedo, Sanchez, Tangipa
ABS, ABST OR NV: Castillo, Ellis, Flora, Hadwick, Lackey, Patterson, Quirk-Silva, Celeste Rodriguez, Ta
UPDATED
VERSION: August 21, 2026
CONSULTANT: Paige Brokaw / NAT. RES. / (916) 319-2092 FN: 0004360
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | AB 2051 |
THIRD READING
Bill No: AB 2051
Author: Wicks (D), et al.
Amended: 8/21/26 in Senate
Vote: 21
SENATE NATURAL RES. & WATER COMMITTEE: 7-0, 7/1/26
AYES: Becker, Seyarto, Allen, Cabaldon, Grove, Laird, Stern
SENATE APPROPRIATIONS COMMITTEE: 7-0, 8/13/26
AYES: Cervantes, Seyarto, Cabaldon, Dahle, Grayson, Richardson, Wahab
SENATE NATURAL RES. & WATER COMMITTEE: 7-0, 8/25/26
AYES: Becker, Seyarto, Allen, Cabaldon, Grove, Laird, Stern
ASSEMBLY FLOOR: 65-6, 5/28/26 - See last page for vote
SUBJECT: Public resources: coastal resources: Coastal Resilience Permitting Working Group
SOURCE: Author
DIGEST:
This bill 1) authorizes the California Coastal Commission (Coastal Commission) to retroactively extend for up to 5 years any time limitation established for a local government to act on the Coastal Commission’s suggested modifications to a land use plan amendment that would authorize approval of a 100% affordable housing development which otherwise expired, as provided; and 2) requires the Secretary of the California Natural Resources Agency to convene a Coastal Resilience Permitting Working Group to develop a Coastal Resilience Permitting Roadmap by July 1, 2028 with recommendations for process improvements and legislative reforms to enable efficient environmental permitting of coastal resilience projects statewide, as provided
ANALYSIS:
Existing law:
- Establishes the California Coastal Act of 1976 (Coastal Act) which:
- Establishes the Coastal Commission in the California Natural Resources Agency (CNRA).
- Requires each local government in the coastal zone to prepare a local coastal program (LCP) for that portion of the coastal zone within its jurisdiction, as provided. Requires the precise content of each LCP to be determined by the local government in full consultation with the Coastal Commission and full public participation. (Public Resources Code (PRC) §30500)
- Each LCP includes a land use plan and an implementation plan. The land use plan contains policies and the implementation plan includes accompanying measures to implement the land use plan, including zoning ordinances, and zoning district maps, among others.
- Authorizes the Coastal Commission for good cause to extend for up to one year any time limitation established related to the preparation, approval, and certification of a LCP.
- Provides for the planning and regulation of development within the coastal zone.
- A person planning to perform or undertake any development in the coastal zone is required to obtain a coastal development permit (CDP) from the Coastal Commission or local government enforcing an LCP certified by the Coastal Commission.
- The coastal zone means the coastal land and waters of California, and includes the lands that extend inland generally 1,000 yards from the mean high tide line, as specified, with various exceptions including the San Francisco Bay.
- Development means, among other things, the placement or erection of any solid material or structure on land or in water.
- Requires the Coastal Commission to take into account the effects of sea level rise in coastal resources planning and management policies and activities in order to identify, assess, and, to the extent feasible, avoid and mitigate the adverse effects of sea level rise. (PRC §30270)
- Establishes the San Francisco Bay Conservation and Development Commission (BCDC): (Government Code (GOV) §§66600 et seq.)
- BCDC, among other things, is required to address emerging issues and to implement comprehensive plans for the preservation and protection of San Francisco Bay and the Suisun Marsh, including preparedness for, and resilience to, rising sea levels, tides, and storm surge due to climate change. BCDC has adopted the San Francisco Bay Plan, which is a comprehensive plan that addresses the development of the bay and shoreline.
- Requires a local government lying within the coastal zone or the San Francisco Bay shoreline to develop a sea level rise plan as part of a LCP or subregional San Francisco Bay shoreline resiliency plan subject to BCDC’s approval, as provided.
- Requires local governments to comply by January 1, 2034.
- Requires the Coastal Commission and BCDC to establish guidelines for the sea level rise plan, as provided.
- Requires local governments that receive Coastal Commission or BCDC approval of their sea level rise plans be prioritized for funding, subject to appropriation, for the implementation of sea level rise adaptation strategies and recommended projects in the approval sea level rise plan. (PRC §§30985, 30985.2, 30985.5)
This bill:
- In addition to existing law authorizing the Coastal Commission to extend certain deadlines by up to one year, authorizes the Coastal Commission to retroactively extend for up to five years any time limitation established for a local government to act on the Coastal Commission’s suggested modifications to a land use plan amendment that would authorize approval of a 100% affordable housing development which otherwise expired between January 1, 2025 and December 1, 2026, as provided.
- Requires the Secretary of CNRA (CNRA Secretary) to develop a Coastal Resilience Permitting Roadmap (Roadmap) with recommendations for process improvements and legislative reforms to enable efficient and timely delivery of environmental approvals by July 1, 2028.
- Requires the CNRA Secretary, in consultation with the Secretary of the California Environmental Protection Agency (CalEPA), to convene a Coastal Resilience Permitting Working Group (Working Group) for the purpose of developing the Roadmap.
- Requires that the Working Group consist of representatives from federal, state, and local agencies, including but not limited to: the Coastal Commission; CalEPA; the State Water Resources Control Board (State Water Board) and regional water quality control board representatives (Regional Water Boards); the California Department of Fish and Wildlife; the Governor’s Office of Land Use and Climate Innovation; CNRA; the Ocean Protection Council; BCDC; the State Coastal Conservancy; the State Lands Commission; and the State Office of Historic Preservation.
- Requires that the Roadmap include, at minimum, recommendations that address:
- Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including, among others:
- Improving efficiency in the process for agencies to determine and communicate that permit applications are complete including through the use of tools, as provided; and
- Unified applications with a predictable sequence and timeline for review;
- A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, as provided;
- Legislative reforms that have the greatest potential to further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements, as provided;
- A coastal resilience project pilot program and any required legislative authorizations, if needed to test alternative approaches;
- An evaluation of whether consolidated coastal resilience permits, similar to those provided for offshore wind, would facilitate timely permits; and
- Workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, as provided.
- Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including, among others:
- Requires, on or before April 1, 2027, the CNRA Secretary, in collaboration with the commission, BCDC, the California Department of Fish and Wildlife (CDFW), and the State Water Board and Regional Water Boards, convene a Coastal Resilience Permit Advisory Group (Advisory Group), consisting of representatives from at least the following:
- State Department of Transportation, State Coastal Conservancy, and other relevant state agencies that seek permits for projects in coastal areas;
- Local governments required to update their LCPs for sea level rise;
- California ports;
- Local transportation agencies and wastewater treatment agencies, as specified;
- California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission; and
- Other members of the public, including businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, and environmental justice organizations.
- Requires the CNRA Secretary, in consultation with the Coastal Commission, BCDC, CDFW, the State Water Board and the Regional Water Boards to conduct a series of public workshops with the Advisory Group or subgroups thereof to:
- Solicit feedback regarding challenges with existing permitting processes; and
- Review and seek comment on draft reform proposals from the Working Group’s Roadmap.
- Provides that a project alternative should be developed that uses existing natural features and ecosystem processes, or the restoration of natural features and ecosystem processes, to mee a project’s goals when developing infrastructure to address adaption, where feasible.
- Defines “coastal resilience project” as a project that maintains, protects, restores, or enables coastal ecosystems, infrastructure, or communities to withstand and adapt to sea level rise and other natural hazards amplified by climate change. Makes relevant legislative findings and declarations.
[NOTE: Additional information regarding this bill may be found in the Senate Natural Resources and Water Committee’s bill analysis.]
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to Senate Appropriations Committee for a previous version of this bill:
- One-time costs, likely in the high hundreds of thousands of dollars spread over 2-3 years (General Fund) for CNRA to facilitate interagency collaboration, public workshops, development of the Roadmap, and other deliverables required by the bill.
- One-time costs, likely in the low millions of dollars spread over 2-3 years (General Fund) for the California Coastal Commission estimates to help develop relevant components of the Roadmap, including recommendations across 10 topic areas, new state agency mitigation processes, proposed legislative reforms, alternatives analyses, evaluation of the efficacy of offshore wind project permitting practices, and more.
- Unknown but significant ongoing costs, possibly in the millions of dollars annually (General Fund, Waste Discharge Permit Fund, or other fund) for the State Water Board and Regional Water Boards to support state and regional board participation in the creation of Coastal Resilience Permitting Roadmap, including expansive subject matter expertise, developing recommendations, participating in statewide public workshops, providing legal consultation, and ensuring the necessary internal operational support to carry out the bill’s provisions. In addition, the State Water Board anticipates that the scale of the required implementable solutions required by this bill’s provisions would have significant costs ongoing, with significant information technology resources required to develop unified applications on a statewide or regional scale.
- Ongoing costs, likely around $1 million annually (General Fund), for the San Francisco Bay Conservation and Development Commission.(BCDC) to assist with development of the Roadmap and implement reforms identified by the Working Group. BCDC notes that without additional positions and contracting resources, BCDC may need to utilize its existing permitting staff and its regulatory improvements team to implement this bill, thereby increasing permitting timelines and delaying implementation of BCDC’s preexisting efforts to improve permitting processes.
- One-time costs, likely less than $1 million spread over 3-4 years (General Fund), for the California Department of Fish and Wildlife (CDFW) to organize input from the department’s coastal regions (specifically, regions one, three, four, five, and seven); participate in the Working Group, Advisory Group, and public workshops; and assist with the development and review of the Roadmap.
- One-time costs, likely less than $1 million spread over 3-4 years (General Fund), for the California Environmental Protection Agency (CalEPA) to consult with the members of the Working Group to collaborate on the drafting and recommendations to be included in the Roadmap.
- One-time costs, likely less than $1 million spread over 3-4 years (General Fund), for the California Department of Transportation (Caltrans) to consultant services to participate in the Advisory Group, participate in public workshops, and assist with the development and review of the Roadmap and legislative reforms resulting from recommendations made in the Roadmap.
SUPPORT: (Verified 8/24/26)
Bay Area Council (co-source)
Bay Planning Coalition (co-source)
Abundant Housing LA
ACT-LA
AltaSea
Association of California Cities – Orange County
California Council for Affordable Housing
California Democratic Party Rural Caucus
California Shore & Beach Preservation Association
California State Association of Counties
CD 11 Coalition for Human Rights
City and County of San Francisco
City of Los Alamitos
City of Oceanside
City of Port Hueneme
City of San Rafael
City/County Association of Governments of San Mateo County
Coastal Quest
County of Los Angeles
County of Marin
County of Monterey
County of Orange
Downtown Women’s Center
East Bay Dischargers Authority
East Bay Regional Park District
ECOncrete
Enterprise Community Partners
Filoli
Ground Game LA
Hollywood Community Housing Corporation
Homes & Hope
Housing Action Coalition
Indivisible South Bay LA
Inner City Law Center
Kiewit Infrastructure West Company
LA Forward
Legal Aid Foundation of Los Angeles
Long Beach Forward
Los Angeles Alliance for a New Economy
Los Angeles County Young Democrats
Mar Vista Voice
Marin Community Foundation
McFadden Finch Holdings Company
Mental Health Advocacy Services
National Alliance to End Homelessness
Neighborhood Legal Services
One Shoreline
Orange County Council of Governments
Orange County Transportation Authority
Port of Redwood City
Port of San Francisco
Public Advocates
Public Counsel
Public Interest Law Project
Safe Place For Youth
SAJE
San Francisco Bay Ferry
San Francisco International Airport
Santa Clara Valley Water District
Self-Help Enterprises
Senior Advocacy Network
Social Justice Learning Institute
South Bay Housing Crisis Working Group
Southern California Association of Non-Profit Housing
Supportive Housing Alliance
The Exploratorium
The Honorable Todd Gloria, Mayor, City of San Diego
The Nature Conservancy
T.R.U.S.T. South LA
Union Station Homeless Services
USC Gould School of Law Housing Law and Policy Clinic
Venice Community Housing
Wareham Development
Western Center on Law and Poverty
Westside Young Democrats
WILDCOAST
Women Organizing Resources, Knowledge and Services
OPPOSITION: (Verified 8/24/26)
None received
ARGUMENTS IN SUPPORT: According to the author, “AB 2051 directs the Natural Resources Agency to convene a Coastal Resilience Permitting Working Group who will meet to develop a Roadmap for projects proposed along California’s coast and in the San Francisco Bay. Under current law, a project sponsor on the coast may need to secure more than ten separate permits from state, federal, and local agencies. Decades worth of well-meaning permitting processes are overlaid on top of one another, and it is too expensive and time-consuming to move with the speed and cost efficiency our coastline is going to need to adapt to sea-level rise and an altered climate. The bill also gives the Coastal Commission the ability to extend, under narrow conditions, the expiration date of suggested modifications to a local land use plan that would facilitate the approval of a 100% affordable housing development.”
In a joint sign-on letter in support, Venice Community Housing, among others, write, “The California Department of Housing and Community Development has awarded Venice Dell $42.5 million in funds, which requires a construction start by spring 2028. As the remaining hurdles to the project get stripped away, allowing the Coastal Commission to renew its approval of the project will save months of repeat work, enable the project to meet its funding deadline, and allow hundreds of people to have a safe and affordable home.”
ASSEMBLY FLOOR: 65-6, 5/28/26
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Chen, Connolly, Davies, Elhawary, Fong, Gabriel, Gallagher, Garcia, Gipson, Jeff Gonzalez, Mark González, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Pellerin, Petrie-Norris, Ramos, Ransom, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NOES: DeMaio, Dixon, Johnson, Macedo, Sanchez, Tangipa
NO VOTE RECORDED: Castillo, Ellis, Flora, Hadwick, Lackey, Patterson, Quirk-Silva, Celeste Rodriguez, Ta
Prepared by: Katharine Moore / N.R. & W. / (916) 651-4116
8/25/26 21:20:31
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | AB 2051 |
THIRD READING
Bill No: AB 2051
Author: Wicks (D), et al.
Amended: 8/21/26 in Senate
Vote: 21
SENATE NATURAL RES. & WATER COMMITTEE: 7-0, 7/1/26
AYES: Becker, Seyarto, Allen, Cabaldon, Grove, Laird, Stern
SENATE APPROPRIATIONS COMMITTEE: 7-0, 8/13/26
AYES: Cervantes, Seyarto, Cabaldon, Dahle, Grayson, Richardson, Wahab
ASSEMBLY FLOOR: 65-6, 5/28/26 - See last page for vote
SUBJECT: Public resources: coastal resources: Coastal Resilience Permitting Working Group
SOURCE: Bay Area Council
Bay Planning Coalition
DIGEST:
This bill 1) authorizes the California Coastal Commission (Coastal Commission) to retroactively extend for up to 5 years any time limitation established for a local government to act on the Coastal Commission’s suggested modifications to a land use plan amendment that would authorize approval of a 100% affordable housing development which otherwise expired, as provided; and 2) requires the Secretary of the California Natural Resources Agency to convene a Coastal Resilience Permitting Working Group to develop a Coastal Resilience Permitting Roadmap by July 1, 2028 with recommendations for process improvements and legislative reforms to enable efficient environmental permitting of coastal resilience projects statewide, as provided.
Senate Floor Amendments of 8/21/26 authorize the Coastal Commission to retroactively extend for up to 5 years any time limitation established for a local government to act on the Coastal Commission’s suggested modifications to a land use plan amendment that would authorize approval of a 100% affordable housing development which otherwise expired between January 1, 2025 and December 1, 2026, as provided.
ANALYSIS:
Existing law:
- Establishes the California Coastal Act of 1976 (Coastal Act) which:
- Establishes the Coastal Commission in the California Natural Resources Agency (CNRA).
- Requires each local government in the coastal zone to prepare a local coastal program (LCP) for that portion of the coastal zone within its jurisdiction, as provided. Requires the precise content of each LCP to be determined by the local government in full consultation with the Coastal Commission and full public participation. (Public Resources Code (PRC) §30500)
- Each LCP includes a land use plan and an implementation plan. The land use plan contains policies and the implementation plan includes accompanying measures to implement the land use plan, including zoning ordinances, and zoning district maps, among others.
- Authorizes the Coastal Commission for good cause to extend for up to one year any time limitation established related to the preparation, approval, and certification of a LCP.
- Provides for the planning and regulation of development within the coastal zone.
- A person planning to perform or undertake any development in the coastal zone is required to obtain a coastal development permit (CDP) from the Coastal Commission or local government enforcing a LCP certified by the Coastal Commission.
- The coastal zone means the coastal land and waters of California, and includes the lands that extend inland generally 1,000 yards from the mean high tide line, as specified, with various exceptions including the San Francisco Bay.
- Development means, among other things, the placement or erection of any solid material or structure on land or in water.
- Requires the Coastal Commission to take into account the effects of sea level rise in coastal resources planning and management policies and activities in order to identify, assess, and, to the extent feasible, avoid and mitigate the adverse effects of sea level rise. (PRC §30270)
- Establishes the San Francisco Bay Conservation and Development Commission (BCDC): (Government Code (GOV) §§66600 et seq.)
- BCDC, among other things, is required to address emerging issues and to implement comprehensive plans for the preservation and protection of San Francisco Bay and the Suisun Marsh, including preparedness for, and resilience to, rising sea levels, tides, and storm surge due to climate change. BCDC has adopted the San Francisco Bay Plan, which is a comprehensive plan that addresses the development of the bay and shoreline.
- Requires a local government lying within the coastal zone or the San Francisco Bay shoreline to develop a sea level rise plan as part of a LCP or subregional San Francisco Bay shoreline resiliency plan subject to BCDC’s approval, as provided.
- Requires local governments to comply by January 1, 2034.
- Requires the Coastal Commission and BCDC to establish guidelines for the sea level rise plan, as provided.
- Requires local governments that receive Coastal Commission or BCDC approval of their sea level rise plans be prioritized for funding, subject to appropriation, for the implementation of sea level rise adaptation strategies and recommended projects in the approval sea level rise plan. (PRC §§30985, 30985.2, 30985.5)
This bill:
- Additionally authorizes the Coastal Commission to retroactively extend for up to 5 years any time limitation established for a local government to act on the Coastal Commission’s suggested modifications to a land use plan amendment that would authorize approval of a 100 percent affordable housing development which otherwise expired between January 1, 2025 and December 1, 2026, as provided.
- Requires the Secretary of CNRA (CNRA Secretary) to develop a Coastal Resilience Permitting Roadmap (Roadmap) with recommendations for process improvements and legislative reforms to enable efficient and timely delivery of environmental approvals by July 1, 2028.
- Requires the CNRA Secretary, in consultation with the Secretary of the California Environmental Protection Agency (CalEPA), to convene a Coastal Resilience Permitting Working Group (Working Group) for the purpose of developing the Roadmap.
- Require that the Working Group consist of representatives from federal, state, and local agencies, including but not limited to:
- The Coastal Commission;
- CalEPA;
- The State Water Resources Control Board (State Water Board) and regional water quality control board representatives (Regional Water Boards)
- The California Department of Fish and Wildlife;
- The Governor’s Office of Land Use and Climate Innovation;
- CNRA;
- The Ocean Protection Council;
- BCDC;
- The State Coastal Conservancy;
- The State Lands Commission; and
- The State Office of Historic Preservation.
- Requires that the Roadmap include, at minimum, recommendations that address:
- Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including, among others:
- Improving efficiency in the process for agencies to determine and communicate that permit applications are complete including through the use of tools, as provided; and
- Unified applications with a predictable sequence and timeline for review;
- A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, as provided;
- Legislative reforms that have the greatest potential to further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements, as provided;
- A coastal resilience project pilot program and any required legislative authorizations, if needed to test alternative approaches;
- An evaluation of whether consolidated coastal resilience permits, similar to those provided for offshore wind, would facilitate timely permits; and
- Workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, as provided.
- Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including, among others:
- Requires, on or before April 1, 2027, the CNRA Secretary, in collaboration with the commission, BCDC, CDFW, and the State Water Board and Regional Water Boards, convene a Coastal Resilience Permit Advisory Group (Advisory Group), consisting of representatives from at least the following:
- State Department of Transportation, State Coastal Conservancy, and other relevant state agencies that seek permits for projects in coastal areas;
- Local governments required to update their LCPs for sea level rise;
- California ports;
- Local transportation agencies and wastewater treatment agencies, as specified;
- California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission; and
- Other members of the public, including businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, and environmental justice organizations.
- Requires the CNRA Secretary, in consultation with the Coastal Commission, BCDC, CDFW, the State Water Board and the Regional Water Boards to conduct a series of public workshops with the Advisory Group or subgroups thereof to:
- Solicit feedback regarding challenges with existing permitting processes; and
- Review and seek comment on draft reform proposals from the Working Group’s Roadmap.
- Provides that a project alternative should be developed that uses existing natural features and ecosystem processes, or the restoration of natural features and ecosystem processes, to mee a project’s goals when developing infrastructure to address adaption, where feasible.
- Defines “coastal resilience project” as a project that maintains, protects, restores, or enables coastal ecosystems, infrastructure, or communities to withstand and adapt to sea level rise and other natural hazards amplified by climate change. Makes relevant legislative findings and declarations.
[NOTE: Additional information regarding this bill may be found in the Senate Natural Resources and Water Committee’s bill analysis.]
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to Senate Appropriations Committee for a previous version of this bill:
- One-time costs, likely in the high hundreds of thousands of dollars spread over 2-3 years (General Fund) for CNRA to facilitate interagency collaboration, public workshops, development of the Roadmap, and other deliverables required by the bill.
- One-time costs, likely in the low millions of dollars spread over 2-3 years (General Fund) for the California Coastal Commission estimates to help develop relevant components of the Roadmap, including recommendations across 10 topic areas, new state agency mitigation processes, proposed legislative reforms, alternatives analyses, evaluation of the efficacy of offshore wind project permitting practices, and more.
- Unknown but significant ongoing costs, possibly in the millions of dollars annually (General Fund, Waste Discharge Permit Fund, or other fund) for the State Water Board and Regional Water Boards to support state and regional board participation in the creation of Coastal Resilience Permitting Roadmap, including expansive subject matter expertise, developing recommendations, participating in statewide public workshops, providing legal consultation, and ensuring the necessary internal operational support to carry out the bill’s provisions. In addition, the State Water Board anticipates that the scale of the required implementable solutions required by this bill’s provisions would have significant costs ongoing, with significant information technology resources required to develop unified applications on a statewide or regional scale.
- Ongoing costs, likely around $1 million annually (General Fund), for the San Francisco Bay Conservation and Development Commission.(BCDC) to assist with development of the Roadmap and implement reforms identified by the Working Group. BCDC notes that without additional positions and contracting resources, BCDC may need to utilize its existing permitting staff and its regulatory improvements team to implement this bill, thereby increasing permitting timelines and delaying implementation of BCDC’s preexisting efforts to improve permitting processes.
- One-time costs, likely less than $1 million spread over 3-4 years (General Fund), for the California Department of Fish and Wildlife (CDFW) to organize input from the department’s coastal regions (specifically, regions one, three, four, five, and seven); participate in the Working Group, Advisory Group, and public workshops; and assist with the development and review of the Roadmap.
- One-time costs, likely less than $1 million spread over 3-4 years (General Fund), for the California Environmental Protection Agency (CalEPA) to consult with the members of the Working Group to collaborate on the drafting and recommendations to be included in the Roadmap.
- One-time costs, likely less than $1 million spread over 3-4 years (General Fund), for the California Department of Transportation (Caltrans) to consultant services to participate in the Advisory Group, participate in public workshops, and assist with the development and review of the Roadmap and legislative reforms resulting from recommendations made in the Roadmap.
SUPPORT: (Verified 8/14/26)
Bay Area Council (co-source)
Bay Planning Coalition (co-source)
AltaSea
Association of California Cities – Orange County
California Democratic Party Rural Caucus
California Shore & Beach Preservation Association
California State Association of Counties
City and County of San Francisco
City of Los Alamitos
City of Oceanside
City of Port Hueneme
City of San Rafael
City/County Association of Governments of San Mateo County
Coastal Quest
County of Los Angeles
County of Marin
County of Monterey
County of Orange
East Bay Dischargers Authority
East Bay Regional Park District
ECOncrete
Filoli
Kiewit Infrastructure West Company
Marin Community Foundation
McFadden Finch Holdings Company
One Shoreline
Orange County Council of Governments
Orange County Transportation Authority
Port of Redwood City
Port of San Francisco
San Francisco Bay Ferry
San Francisco International Airport
Santa Clara Valley Water District
The Exploratorium
The Honorable Todd Gloria, Mayor, City of San Diego
The Nature Conservancy
Wareham Development
WILDCOAST
OPPOSITION: (Verified 8/14/26)
None received
ARGUMENTS IN SUPPORT: According to the author, “AB 2051 directs the Natural Resources Agency to convene a Coastal Resilience Permitting Working Group, who will meet to develop a Roadmap for projects proposed along California’s coast and in the San Francisco Bay.”
“Under current law, a project sponsor on the coast may need to secure more than ten separate permits from state, federal, and local agencies. The process is beset by redundant and inconsistent application requirements, no aligned review timelines, sequential rather than concurrent permit processing, no single lead agency to coordinate or resolve conflicts, and chronic staffing vacancies in agencies that require highly specialized expertise.”
“Decades worth of well-meaning permitting processes are overlaid on top of one another, and it is still too expensive and time-consuming to move with the speed and cost efficiency our coastline is going to need to adapt to sea-level rise and an altered climate.”
“AB 2051 does not change existing permitting requirements or weaken any environmental protection. An advisory group mandated in the bill is specifically charged to ensure that streamlining efforts do not weaken protections for fish and wildlife habitat, tribal cultural resources, or public access. The bill sets California on a path that will lead to actionable recommendations that improve permit issuance timelines, align mitigation requirements, accelerate permitting, and assess how to recruit and retain essential permitting staff.”
ASSEMBLY FLOOR: 65-6, 5/28/26
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Chen, Connolly, Davies, Elhawary, Fong, Gabriel, Gallagher, Garcia, Gipson, Jeff Gonzalez, Mark González, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Pellerin, Petrie-Norris, Ramos, Ransom, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NOES: DeMaio, Dixon, Johnson, Macedo, Sanchez, Tangipa
NO VOTE RECORDED: Castillo, Ellis, Flora, Hadwick, Lackey, Patterson, Quirk-Silva, Celeste Rodriguez, Ta
Prepared by: Katharine Moore / N.R. & W. / (916) 651-4116
8/24/26 11:01:03
**** END ****
SENATE COMMITTEE ON NATURAL RESOURCES AND WATER
Senator Josh Becker, Chair
2025 - 2026 Regular
Bill No: AB Hearing Date: August 25, 2026
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
Subject: Public resources: coastal resources: Coastal Resilience Permitting Working Group
SUMMARY
This bill would authorize the California Coastal Commission (Coastal Commission) to retroactively extend, for up to five years, any time limitation established for a local government to act on the Coastal Commission’s suggested modifications to a land use plan amendment that would authorize approval of a 100% affordable housing development which otherwise expired, as provided; and would require the Secretary of the California Natural Resources Agency to convene a Coastal Resilience Permitting Working Group to develop a Coastal Resilience Permitting Roadmap with recommendations for process improvements and legislative reforms to enable efficient environmental permitting of coastal resilience projects statewide, as provided.
BACKGROUND AND EXISTING LAW
The Coastal Commission.
The Coastal Commission was established by voter initiative in 1972. The Legislature later made the Coastal Commission permanent through the adoption of the California Coastal Act of 1976 (Coastal Act) (Public Resources Code (PRC) §§30000 et seq.). The Coastal Commission plans for and regulates the use of land and water in the coastal zone (which excludes the San Francisco Bay Conservation and Development Commission’s jurisdiction in the San Francisco Bay).
Development activities in the coastal zone generally require a coastal development permit (CDP) issued by the Coastal Commission or by a local government with a local coastal program (LCP) certified by the Coastal Commission. A LCP is comprised of two parts – a land use plan and an implementation plan. A certified LCP can be amended and the Coastal Commission would have to approve the amendment for it to go into effect. Coastal Act policies are the standards the Coastal Commission uses to determine the permissibility of proposed developments subject to its jurisdiction.
The Venice Dell Community Housing Project
The Venice Dell Community Housing Project, developed by the nonprofit developers Venice Community Housing and Hollywood Community Housing Corporation, is a proposed 100% affordable housing project in Venice, California comprised of two mixed-use four story structures with 120 affordable housing units, space for retail and supportive services, and parking. Sixty-eight of the units are for individuals experiencing homelessness. It is proposed to be located 800 feet from Venice Beach. The project site includes two surface parking lots owned by the City of Los Angeles, and is located in the coastal zone. According to the Los Angeles Times, the project has been in process since 2016.[1]
On December 11, 2024, the Coastal Commission unanimously approved a CDP with conditions, and certified, contingent upon certain modifications, an amendment to the Venice Land Use Plan which were both required for the Venice Dell Community Housing project to be built.[2] The Venice LUP amendment would re-designate the necessary parcels to “Neighborhood Commercial” use with new development standards. The Coastal Commission’s required modifications to the Venice LUP amendment include correcting typographical errors and outdated language, more accurately reflecting the Venice Dell project, and preserving public access and community character.
According to the Coastal Commission, an initial CDP approval is good for two years, and an applicant may apply for an unlimited number of 2-year time extensions if not vested prior to that date. A recent regulatory change now allows CDPs for 100% affordable housing projects five years to vest, with the option of 2-year time extensions. The City of Los Angeles was required to accept the Coastal Commission’s modifications to the Venice LUP amendment within six months, but did not do so. The Coastal Commission was able to extend the deadline for up to one year pursuant to existing law. This one-time extension expired in June 2026. The CDP cannot go forward without the corresponding changes to the land use designations in the LUP amendment.
The Venice Dell Community Housing Project is controversial, and multiple lawsuits have challenged elements of its permitting. Proponents argue that the City of Los Angeles has delayed the project. In 2025, the Project received a $42.4 million conditional award from the Department of Housing and Community Development (HCD). HCD has written a letter to the City expressing its concerns should the Project not proceed. According to proponents, the HCD funds can be leveraged with other sources to cover the estimated $133 million budget for the Project, and argue that delays in the Project have “real consequences for residents in need of affordable housing.”
The San Francisco Bay Conservation and Development Commission (BCDC)
In 1965, the McAteer-Petris Act (Government Code (GOV) §§66600 et seq.) established BCDC. Although created as a temporary state agency, BCDC was made permanent in 1969 following the completion of the San Francisco Bay Plan (Bay Plan), a comprehensive plan that addresses the development of the bay and shoreline. BCDC’s jurisdiction includes the San Francisco Bay and the land within 100 feet of the shoreline, as provided. Since 2008, BCDC has been the state agency responsible for leading the San Francisco Bay area’s preparedness for, and resilience to, rising sea levels, tides, and storm surge due to climate change. BCDC is required to address emerging issues and keep the Bay Plan up-to-date.
Sea Level Rise in California.
In 2024, the Ocean Protection Council released sea level rise guidance suggesting that sea levels in California will most likely rise 0.8 feet above 2000 levels by 2050 and 1.6–3.1 feet by 2100. Local impacts may vary, with some locations, like Humboldt Bay, likely to see higher sea level rise. With the rise in sea level, more frequent coastal flooding and storm surge will occur, threatening communities and infrastructure along the coast, placing an estimated hundreds of billions of dollars of infrastructure at risk. The cost to address sea level rise is also estimated in the billions of dollars.
Planning for Sea Level Rise.
In order to ensure proactive sea level rise planning occurs in the state, SB 272 (Laird, Chapter 384, Statutes of 2023) requires local governments along the coastline, including San Francisco Bay, to develop a sea level rise plan by January 1, 2034 as part of either a LCP submitted to the Coastal Commission or a shoreline resiliency plan submitted to BCDC. Local governments with approved sea level rise plans are prioritized for funding, subject to appropriation, for the implementation of identified sea level rise adaptation strategies and recommended projects identified in their plans. The Coastal Commission and BCDC were both required to provide guidelines for preparation of sea level rise plans by December 31, 2024.
SB 272 built upon the goals established in SB 1 ((Atkins), Chapter 236, Statutes of 2021) to help coordinate and fund state efforts to prepare for sea level rise associated with climate change, among other things.
In November 2024, the Coastal Commission adopted an updated Sea Level Rise Policy Guidance. The Guidance includes guiding principles for addressing sea level rise in the coastal zone, a discussion of the best available science, step-by-step guidance for addressing sea level rise in LCPs and CDPs, including implementation of SB 272, and possible adaptation strategies, and other provisions.
In December 2024, BCDC approved guidance in order to comply with SB 272’s directive.
Permitting requirements for coastal projects.
According to the Assembly Natural Resources Committee, as many as 16 federal and state permitting agencies may have a role in the permitting for coastal projects.[3] Federal and state agencies involved may include the US Army Corps of Engineers (USACOE), regional water quality control boards, the Coastal Commission, BCDC, the California Department of Fish and Wildlife (CDFW), the US Fish and Wildlife Service (USFWS), the State Lands Commission, and others with overlapping, but distinct, jurisdictions.
Permit streamlining.
Given the complexity of navigating permitting from multiple agencies, in 2024 the Assembly investigated permitting in California through its Select Committee on Permitting Reform. In its final report, the Select Committee identified several best practices, including frontloading planning, providing a clear and straightforward process, maximizing consistency across permitting agencies, and pre-determining mitigation measures.
The San Francisco Bay Restoration Regulatory Integration Team (BRRIT).
The San Francisco Bay Restoration Authority, with support from the U.S. Environmental Protection Agency, convenes dedicated staff from six permitting agencies (USACOE, USFWS, National Oceanic and Atmospheric Administration (NOAA) Fisheries, the San Francisco Bay Regional Water Quality Control Board, CDFW, and BCDC) to improve the permitting process for multi-benefit habitat restoration projects and associated flood management and public access infrastructure. The resulting coordinating group, BRRIT, uses pre-application consultation to accelerate the permitting process. Of the 11 fully-permitted projects identified in the BRRIT 2025 Annual Report, 100% had all permits issued within the target timeline. Where some partially-permitted projects have not met the target timeline, this has been due to late changes to conditions (for example, changes to listed species under the federal Endangered Species Act).
Existing law:
- Establishes the Coastal Act which:
- Establishes the Coastal Commission in the California Natural Resources Agency (CNRA).
- Requires each local government in the coastal zone to prepare a LCP for that portion of the coastal zone within its jurisdiction, as provided. Requires the precise content of each LCP to be determined by the local government in full consultation with the Coastal Commission and full public participation. (PRC §30500)
- Each LCP includes a land use plan and an implementation plan. The land use plan contains policies and the implementation plan includes accompanying measures to implement the land use plan, including zoning ordinances, and zoning district maps, among others.
- Authorizes the Coastal Commission for good cause to extend for up to one year any time limitation established related to the preparation, approval, and certification of a LCP. (PRC §30517)
- Provides for the planning and regulation of development within the coastal zone.
- A person planning to perform or undertake any development in the coastal zone is required to obtain a CDP from the Coastal Commission or local government enforcing a LCP certified by the Coastal Commission.
- The coastal zone means the coastal land and waters of California, and includes the lands that extend inland generally 1,000 yards from the mean high tide line, as specified, with various exceptions including the San Francisco Bay.
- Development means, among other things, the placement or erection of any solid material or structure on land or in water.
- Requires the Coastal Commission to take into account the effects of sea level rise in coastal resources planning and management policies and activities in order to identify, assess, and, to the extent feasible, avoid and mitigate the adverse effects of sea level rise. (PRC §30270)
- Establishes BCDC: (GOV §§66600 et seq.)
- BCDC, among other things, is required to address emerging issues and to implement comprehensive plans for the preservation and protection of San Francisco Bay and the Suisun Marsh, including preparedness for, and resilience to, rising sea levels, tides, and storm surge due to climate change. BCDC has adopted the San Francisco Bay Plan, which is a comprehensive plan that addresses the development of the bay and shoreline.
- Requires a local government lying within the coastal zone or the San Francisco Bay shoreline to develop a sea level rise plan as part of a LCP or subregional San Francisco Bay shoreline resiliency plan subject to BCDC’s approval.
- Requires the sea level rise plan to include the use of best available science, a vulnerability assessment to ensure equity for at-risk communities, sea level rise adaptation strategies and recommended projects, identification of lead planning and implementation agencies, and a timeline for updates to the plan. Requires that the timeline include economic impact analyses of costs to critical public infrastructure and recommended approaches for implementing sea level rise, as provided.
- Requires local governments to comply by January 1, 2034.
- Requires the Coastal Commission and BCDC to establish guidelines for the sea level rise plan, as provided.
- Requires local governments that receive Coastal Commission or BCDC approval of their sea level rise plans be prioritized for funding, subject to appropriation, for the implementation of sea level rise adaptation strategies and recommended projects in the approval sea level rise plan. (PRC §§30985, 30985.2, 30985.5)
PROPOSED LAW
This bill would:
- In addition to existing law authorizing the Coastal Commission to extend certain deadlines by up to one year, authorize the Coastal Commission to retroactively extend for up to five years any time limitation established for a local government to act on the Coastal Commission’s suggested modifications to a land use plan amendment that would authorize approval of a 100% affordable housing development which otherwise expired between January 1, 2025 and December 1, 2026, as provided.
- Require the Secretary of the California Natural Resources Agency (CNRA Secretary) to develop a Coastal Resilience Permitting Roadmap (Roadmap) with recommendations for process improvements and legislative reforms to enable efficient and timely delivery of environmental approvals by July 1, 2028.
- Require the CNRA Secretary, in consultation with the Secretary of the California Environmental Protection Agency (CalEPA), to convene a Coastal Resilience Permitting Working Group (Working Group) for the purpose of developing the Roadmap.
- Require that the Working Group consist of representatives from federal, state, and local agencies, including but not limited to:
- The Coastal Commission;
- CalEPA;
- The State Water Resources Control Board (State Water Board) and regional water quality control board representatives (Regional Water Boards);
- CDFW;
- The Governor’s Office of Land Use and Climate Innovation;
- CNRA;
- The Ocean Protection Council;
- BCDC;
- The State Coastal Conservancy;
- The State Lands Commission; and
- The State Office of Historic Preservation.
- Require that the Roadmap include, at minimum, recommendations that address:
- Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including, among others:
- Improving efficiency in the process for agencies to determine and communicate that permit applications are complete including through the use of tools, as provided; and
- Unified applications with a predictable sequence and timeline for review;
- A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, as provided;
- Legislative reforms that have the greatest potential to further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements, as provided;
- A coastal resilience project pilot program and any required legislative authorizations, if needed, to test alternative approaches;
- An evaluation of whether consolidated coastal resilience permits, similar to those provided for offshore wind, would facilitate timely permits; and
- Workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, as provided.
- Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including, among others:
- Require, on or before April 1, 2027, the CNRA Secretary, in collaboration with the Coastal Commission, BCDC, CDFW, and the State Water Board and Regional Water Boards, convene a Coastal Resilience Permit Advisory Group (Advisory Group), consisting of representatives from at least the following:
- State Department of Transportation, State Coastal Conservancy, and other relevant state agencies that seek permits for projects in coastal areas;
- Local governments required to update their LCPs for sea level rise;
- California ports;
- Local transportation agencies and wastewater treatment agencies, as specified;
- California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission; and
- Other members of the public, including businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, and environmental justice organizations.
- Require the CNRA Secretary, in consultation with the Coastal Commission, BCDC, CDFW, the State Water Board and the Regional Water Boards to conduct a series of public workshops with the Advisory Group or subgroups thereof to:
- Solicit feedback regarding challenges with existing permitting processes; and
- Review and seek comment on draft reform proposals from the Working Group’s Roadmap.
- Provide that a project alternative should be developed that uses existing natural features and ecosystem processes, or the restoration of natural features and ecosystem processes, to meet a project’s goals when developing infrastructure to address adaptation, where feasible.
- Define “coastal resilience project” as a project that maintains, protects, restores, or enables coastal ecosystems, infrastructure, or communities to withstand and adapt to sea level rise and other natural hazards amplified by climate change.
- Make relevant legislative findings and declarations.
ARGUMENTS IN SUPPORT
According to the author, “AB 2051 directs the Natural Resources Agency to convene a Coastal Resilience Permitting Working Group who will meet to develop a Roadmap for projects proposed along California’s coast and in the San Francisco Bay. Under current law, a project sponsor on the coast may need to secure more than ten separate permits from state, federal, and local agencies. Decades worth of well-meaning permitting processes are overlaid on top of one another, and it is too expensive and time-consuming to move with the speed and cost efficiency our coastline is going to need to adapt to sea-level rise and an altered climate. The bill also gives the Coastal Commission the ability to extend, under narrow conditions, the expiration date of suggested modifications to a local land use plan that would facilitate the approval of a 100% affordable housing development.”
In a joint sign-on letter in support, Venice Community Housing, among others, write, “The California Department of Housing and Community Development has awarded Venice Dell $42.5 million in funds, which requires a construction start by spring 2028. As the remaining hurdles to the project get stripped away, allowing the Coastal Commission to renew its approval of the project will save months of repeat work, enable the project to meet its funding deadline, and allow hundreds of people to have a safe and affordable home.”
ARGUMENTS IN OPPOSITION
None received
COMMENTS
Rule 29.10b. This bill was substantially amended on the Senate floor and returned to this Committee for rehearing under Senate Rule 29.10b. Under that rule, the Committee cannot amend the bill, but can make recommendations for amendments to the author.
In its prior form which included just the development of the Roadmap, this bill passed this Committee on a unanimous 7 – 0 vote at the July 1, 2026, hearing.
Homelessness in California. According to the Senate Housing Committee,
According to the most recent point in time (PIT) count, 187,084 people were experiencing homelessness in California – representing 24% of the nation’s homeless population. Two-thirds of the homeless population in California is unsheltered. Over half (51%) of all unsheltered people in the United States were in California. A lack of affordable housing is the biggest contributor to homelessness. As housing costs continue to rise, rent becomes less affordable for lower-income households, who are forced to live beyond their means (paying more than 30% of income on housing costs) or are pushed out of their homes, leading to rapid increases in homelessness. Variation in rates of homelessness cannot be explained by variation in rates of individual factors such as poverty or mental illness; conversely, cities with higher rent and lower rental vacancy rates (i.e. tighter housing markets) are directly linked to higher per capita rates of homelessness.
The lack of affordable housing plays a significant role in causing individuals to become homeless and creates obstacles for individuals experiencing homeless to transition into stable housing. The need for, and costs of, housing have consistently outpaced the development of affordable housing for over 30 years. As of 2022, working at the minimum wage of $15/hour, a renter has to work 83 hours each week to afford a modest one-bedroom rental home at Fair Market Rent in California. The lack of supply is the primary factor underlying California’s housing crunch. To keep up with demand, HCD estimates that California must plan for the development of more than 2.5 million homes over the next eight years, and no less than one million of those homes must meet the needs of lower income households (more than 640,000 very low-income and 385,000 low-income units are needed). For decades, not enough housing was constructed to meet need, resulting in a severe undersupply of housing. New construction of housing, both single family homes and apartments, continues to lag behind historical average, and lags further behind the number of new units needed to meet housing demand.
The Venice Dell project, as proposed, includes housing and supportive services for those experiencing homelessness, and housing for those with low incomes and extremely low incomes.
Roadmap: Benefits of early agency coordination. As noted in the background, the potential impacts of sea level rise on the state’s coastline are anticipated to be extensive with significant damage, loss, and expense anticipated to public safety, infrastructure, and the environment, among other things. Facilitating early discussions and coordination among project proponents and permitting agencies can help identify challenges before a permit from one agency becomes delayed with cascading impacts to subsequent approvals (in other words, certain agency permitting decisions rely upon permits issued by other agencies).
The BRITT, described in the background, appears to be an effective model for coordination among agencies to spur permitting for certain projects. Additionally, both BCDC and the Coastal Commission have accelerated permitting pathways for projects with a nominal impact on the surrounding environment.
SUGGESTED AMENDMENTS: none
SUPPORT
Bay Area Council (co-source)
Bay Planning Coalition (co-source)
Abundant Housing LA
ACT-LA
AltaSea
Association of California Cities – Orange County
California Council for Affordable Housing
California Democratic Party Rural Caucus
California Shore & Beach Preservation Association
California State Association of Counties
CD 11 Coalition for Human Rights
City and County of San Francisco
City of Los Alamitos
City of Oceanside
City of Port Hueneme
City of San Rafael
City/County Association of Governments of San Mateo County
Coastal Quest
County of Los Angeles
County of Marin
County of Monterey
County of Orange
Downtown Women’s Center
East Bay Dischargers Authority
East Bay Regional Park District
ECOncrete
Enterprise Community Partners
Filoli
Ground Game LA
Hollywood Community Housing Corporation
Homes & Hope
Housing Action Coalition
Indivisible South Bay LA
Inner City Law Center
Kiewit Infrastructure West Company
LA Forward
Legal Aid Foundation of Los Angeles
Long Beach Forward
Los Angeles Alliance for a New Economy
Los Angeles County Young Democrats
Mar Vista Voice
Marin Community Foundation
McFadden Finch Holdings Company
Mental Health Advocacy Services
National Alliance to End Homelessness
Neighborhood Legal Services
One Shoreline
Orange County Council of Governments
Orange County Transportation Authority
Port of Redwood City
Port of San Francisco
Public Advocates
Public Counsel
Public Interest Law Project
Safe Place For Youth
SAJE
San Francisco Bay Ferry
San Francisco International Airport
Santa Clara Valley Water District
Self-Help Enterprises
Senior Advocacy Network
Social Justice Learning Institute
South Bay Housing Crisis Working Group
Southern California Association of Non-Profit Housing
Supportive Housing Alliance
The Exploratorium
The Honorable Todd Gloria, Mayor, City of San Diego
The Nature Conservancy
T.R.U.S.T. South LA
Union Station Homeless Services
USC Gould School of Law Housing Law and Policy Clinic
Venice Community Housing
Wareham Development
Western Center on Law and Poverty
Westside Young Democrats
WILDCOAST
Women Organizing Resources, Knowledge and Services
Dozens of individuals
OPPOSITION
None received
-- END --
L.A. officials continue to stall homeless housing project in Venice, new lawsuit claims. Liam Dillon, Los Angeles Times, July 12, 2024. ↑
Amendment Request #LCP-5-VEN-23-0037-1. ↑
The number of agencies involved is from the National Oceanic and Atmospheric Administration’s North-Central California Coastal Sediment Coordination Committee’s Efficient Permitting Roadmap. ↑
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | AB 2051 |
THIRD READING
Bill No: AB 2051
Author: Wicks (D), et al.
Amended: 8/13/26 in Senate
Vote: 21
SENATE NATURAL RES. & WATER COMMITTEE: 7-0, 7/1/26
AYES: Becker, Seyarto, Allen, Cabaldon, Grove, Laird, Stern
SENATE APPROPRIATIONS COMMITTEE: 7-0, 8/13/26
AYES: Cervantes, Seyarto, Cabaldon, Dahle, Grayson, Richardson, Wahab
ASSEMBLY FLOOR: 65-6, 5/28/26 - See last page for vote
SUBJECT: Public resources: Coastal Resilience Permitting Working Group
SOURCE: Bay Area Council
Bay Planning Coalition
DIGEST:
This bill requires the Secretary of the California Natural Resources Agency to convene a Coastal Resilience Permitting Working Group to develop a Coastal Resilience Permitting Roadmap by July 1, 2028 with recommendations for process improvements and legislative reforms to enable efficient environmental permitting of coastal resilience projects statewide, as provided.
ANALYSIS:
Existing law:
- Establishes the California Coastal Act of 1976 (Coastal Act) which:
- Establishes the California Coastal Commission (Coastal Commission) in the California Natural Resources Agency (CNRA).
- Requires each local government in the coastal zone to prepare a local coastal program (LCP) for that portion of the coastal zone within its jurisdiction, as provided. Requires the precise content of each LCP to be determined by the local government in full consultation with the Coastal Commission and full public participation. (Public Resources Code (PRC) §30500)
- Provides for the planning and regulation of development within the coastal zone.
- A person planning to perform or undertake any development in the coastal zone is required to obtain a coastal development permit (CDP) from the Coastal Commission or local government enforcing a LCP certified by the Coastal Commission.
- The coastal zone means the coastal land and waters of California, and includes the lands that extend inland generally 1,000 yards from the mean high tide line, as specified, with various exceptions including the San Francisco Bay.
- Development means, among other things, the placement or erection of any solid material or structure on land or in water.
- Requires the Coastal Commission to take into account the effects of sea level rise in coastal resources planning and management policies and activities in order to identify, assess, and, to the extent feasible, avoid and mitigate the adverse effects of sea level rise. (PRC §30270)
- Establishes the San Francisco Bay Conservation and Development Commission (BCDC): (Government Code (GOV) §§66600 et seq.)
- BCDC, among other things, is required to address emerging issues and to implement comprehensive plans for the preservation and protection of San Francisco Bay and the Suisun Marsh, including preparedness for, and resilience to, rising sea levels, tides, and storm surge due to climate change. BCDC has adopted the San Francisco Bay Plan, which is a comprehensive plan that addresses the development of the bay and shoreline.
- Requires a local government lying within the coastal zone or the San Francisco Bay shoreline to develop a sea level rise plan as part of a LCP or subregional San Francisco Bay shoreline resiliency plan subject to BCDC’s approval, as provided.
- Requires local governments to comply by January 1, 2034.
- Requires the Coastal Commission and BCDC to establish guidelines for the sea level rise plan, as provided.
- Requires local governments that receive Coastal Commission or BCDC approval of their sea level rise plans be prioritized for funding, subject to appropriation, for the implementation of sea level rise adaptation strategies and recommended projects in the approval sea level rise plan. (PRC §§30985, 30985.2, 30985.5)
This bill:
- Requires the Secretary of CNRA (CNRA Secretary) to develop a Coastal Resilience Permitting Roadmap (Roadmap) with recommendations for process improvements and legislative reforms to enable efficient and timely delivery of environmental approvals by July 1, 2028.
- Requires the CNRA Secretary, in consultation with the Secretary of the California Environmental Protection Agency (CalEPA), to convene a Coastal Resilience Permitting Working Group (Working Group) for the purpose of developing the Roadmap.
- Require that the Working Group consist of representatives from federal, state, and local agencies, including but not limited to:
- The Coastal Commission;
- CalEPA;
- The State Water Resources Control Board (State Water Board) and regional water quality control board representatives (Regional Water Boards)
- The California Department of Fish and Wildlife;
- The Governor’s Office of Land Use and Climate Innovation;
- CNRA;
- The Ocean Protection Council;
- BCDC;
- The State Coastal Conservancy;
- The State Lands Commission;
- The State Office of Historic Preservation; and
- Requires that the Roadmap include, at minimum, recommendations that address:
- Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including, among others:
- Improving efficiency in the process for agencies to determine and communicate that permit applications are complete including through the use of tools, as provided; and
- Unified applications with a predictable sequence and timeline for review;
- A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, as provided;
- Legislative reforms that have the greatest potential to further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements, as provided;
- A coastal resilience project pilot program and any required legislative authorizations, if needed to test alternative approaches;
- An evaluation of whether consolidated coastal resilience permits, similar to those provided for offshore wind, would facilitate timely permits; and
- Workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, as provided.
- Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including, among others:
- Requires, on or before April 1, 2027, the CNRA Secretary, in collaboration with the commission, BCDC, CDFW, and the State Water Board and Regional Water Boards, convene a Coastal Resilience Permit Advisory Group (Advisory Group), consisting of representatives from at least the following:
- State Department of Transportation, State Coastal Conservancy, and other relevant state agencies that seek permits for projects in coastal areas;
- Local governments required to update their LCPs for sea level rise;
- California ports;
- Local transportation agencies and wastewater treatment agencies, as specified;
- California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission; and
- Other members of the public, including businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, and environmental justice organizations.
- Requires the CNRA Secretary, in consultation with the Coastal Commission, BCDC, CDFW, the State Water Board and the Regional Water Boards to conduct a series of public workshops with the Advisory Group or subgroups thereof to:
- Solicit feedback regarding challenges with existing permitting processes; and
- Review and seek comment on draft reform proposals from the Working Group’s Roadmap.
- Provides that a project alternative should be developed that uses existing natural features and ecosystem processes, or the restoration of natural features and ecosystem processes, to mee a project’s goals when developing infrastructure to address adaption, where feasible.
- Defines “coastal resilience project” as a project that maintains, protects, restores, or enables coastal ecosystems, infrastructure, or communities to withstand and adapt to sea level rise and other natural hazards amplified by climate change.
- Makes relevant legislative findings and declarations.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to Senate Appropriations Committee:
- One-time costs, likely in the high hundreds of thousands of dollars spread over 2-3 years (General Fund) for CNRA to facilitate interagency collaboration, public workshops, development of the Roadmap, and other deliverables required by the bill.
- One-time costs, likely in the low millions of dollars spread over 2-3 years (General Fund) for the California Coastal Commission estimates to help develop relevant components of the Roadmap, including recommendations across 10 topic areas, new state agency mitigation processes, proposed legislative reforms, alternatives analyses, evaluation of the efficacy of offshore wind project permitting practices, and more.
- Unknown but significant ongoing costs, possibly in the millions of dollars annually (General Fund, Waste Discharge Permit Fund, or other fund) for the State Water Board and Regional Water Boards to support state and regional board participation in the creation of Coastal Resilience Permitting Roadmap, including expansive subject matter expertise, developing recommendations, participating in statewide public workshops, providing legal consultation, and ensuring the necessary internal operational support to carry out the bill’s provisions. In addition, the State Water Board anticipates that the scale of the required implementable solutions required by this bill’s provisions would have significant costs ongoing, with significant information technology resources required to develop unified applications on a statewide or regional scale.
- Ongoing costs, likely around $1 million annually (General Fund), for the San Francisco Bay Conservation and Development Commission.(BCDC) to assist with development of the Roadmap and implement reforms identified by the Working Group. BCDC notes that without additional positions and contracting resources, BCDC may need to utilize its existing permitting staff and its regulatory improvements team to implement this bill, thereby increasing permitting timelines and delaying implementation of BCDC’s preexisting efforts to improve permitting processes.
- One-time costs, likely less than $1 million spread over 3-4 years (General Fund), for the California Department of Fish and Wildlife (CDFW) to organize input from the department’s coastal regions (specifically, regions one, three, four, five, and seven); participate in the Working Group, Advisory Group, and public workshops; and assist with the development and review of the Roadmap.
- One-time costs, likely less than $1 million spread over 3-4 years (General Fund), for the California Environmental Protection Agency (CalEPA) to consult with the members of the Working Group to collaborate on the drafting and recommendations to be included in the Roadmap.
- One-time costs, likely less than $1 million spread over 3-4 years (General Fund), for the California Department of Transportation (Caltrans) to consultant services to participate in the Advisory Group, participate in public workshops, and assist with the development and review of the Roadmap and legislative reforms resulting from recommendations made in the Roadmap.
Bay Area Council (co-source)
Bay Planning Coalition (co-source)
AltaSea
Association of California Cities – Orange County
California Democratic Party Rural Caucus
California Shore & Beach Preservation Association
California State Association of Counties
City and County of San Francisco
City of Los Alamitos
City of Oceanside
City of Port Hueneme
City of San Rafael
City/County Association of Governments of San Mateo County
Coastal Quest
County of Los Angeles
County of Marin
County of Monterey
County of Orange
East Bay Dischargers Authority
East Bay Regional Park District
ECOncrete
Filoli
Kiewit Infrastructure West Company
Marin Community Foundation
McFadden Finch Holdings Company
One Shoreline
Orange County Council of Governments
Orange County Transportation Authority
Port of Redwood City
Port of San Francisco
San Francisco Bay Ferry
San Francisco International Airport
Santa Clara Valley Water District
The Exploratorium
The Honorable Todd Gloria, Mayor, City of San Diego
The Nature Conservancy
Wareham Development
WILDCOAST
OPPOSITION: (Verified 8/14/26)
None received
ARGUMENTS IN SUPPORT: According to the author, “AB 2051 directs the Natural Resources Agency to convene a Coastal Resilience Permitting Working Group, who will meet to develop a Roadmap for projects proposed along California’s coast and in the San Francisco Bay.”
“Under current law, a project sponsor on the coast may need to secure more than ten separate permits from state, federal, and local agencies. The process is beset by redundant and inconsistent application requirements, no aligned review timelines, sequential rather than concurrent permit processing, no single lead agency to coordinate or resolve conflicts, and chronic staffing vacancies in agencies that require highly specialized expertise.”
“Decades worth of well-meaning permitting processes are overlaid on top of one another, and it is still too expensive and time-consuming to move with the speed and cost efficiency our coastline is going to need to adapt to sea-level rise and an altered climate.”
“AB 2051 does not change existing permitting requirements or weaken any environmental protection. An advisory group mandated in the bill is specifically charged to ensure that streamlining efforts do not weaken protections for fish and wildlife habitat, tribal cultural resources, or public access. The bill sets California on a path that will lead to actionable recommendations that improve permit issuance timelines, align mitigation requirements, accelerate permitting, and assess how to recruit and retain essential permitting staff.”
ASSEMBLY FLOOR: 65-6, 5/28/26
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Chen, Connolly, Davies, Elhawary, Fong, Gabriel, Gallagher, Garcia, Gipson, Jeff Gonzalez, Mark González, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Pellerin, Petrie-Norris, Ramos, Ransom, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NOES: DeMaio, Dixon, Johnson, Macedo, Sanchez, Tangipa
NO VOTE RECORDED: Castillo, Ellis, Flora, Hadwick, Lackey, Patterson, Quirk-Silva, Celeste Rodriguez, Ta
Prepared by: Katharine Moore / N.R. & W. / (916) 651-4116
8/17/26 10:47:39
**** END ****
SENATE COMMITTEE ON
Senator Sabrina Cervantes, Chair
2025 - 2026 Regular Session
AB 2051 (Wicks) - Public resources: Coastal Resilience Permitting Working Group
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would require the Secretary of the California Natural Resources Agency (CNRA) to convene a Coastal Resilience Permitting Working Group (Working Group) for the purpose of developing a Coastal Resilience Permitting Roadmap (Roadmap) to accelerate coastal resilience projects.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on August 13, 2026
Fiscal Impact:
- One-time costs, likely in the high hundreds of thousands of dollars spread over 2-3 years (General Fund) for CNRA to facilitate interagency collaboration, public workshops, development of the Roadmap, and other deliverables required by the bill.
- One-time costs, likely in the low millions of dollars spread over 2-3 years (General Fund) for the California Coastal Commission estimates to help develop relevant components of the Roadmap, including recommendations across 10 topic areas, new state agency mitigation processes, proposed legislative reforms, alternatives analyses, evaluation of the efficacy of offshore wind project permitting practices, and more.
- Unknown but significant ongoing costs, possibly in the millions of dollars annually (General Fund, Waste Discharge Permit Fund, or other fund) for the State Water Board and Regional Water Boards to support state and regional board participation in the creation of Coastal Resilience Permitting Roadmap, including expansive subject matter expertise, developing recommendations, participating in statewide public workshops, providing legal consultation, and ensuring the necessary internal operational support to carry out the bill’s provisions. In addition, the State Water Board anticipates that the scale of the required implementable solutions required by this bill’s provisions would have significant costs ongoing, with significant information technology resources required to develop unified applications on a statewide or regional scale.
- Ongoing costs, likely around $1 million annually (General Fund), for the San Francisco Bay Conservation and Development Commission.(BCDC) to assist with development of the Roadmap and implement reforms identified by the Working Group. BCDC notes that without additional positions and contracting resources, BCDC may need to utilize its existing permitting staff and its regulatory improvements team to implement this bill, thereby increasing permitting timelines and delaying implementation of BCDC’s preexisting efforts to improve permitting processes.
- One-time costs, likely less than $1 million spread over 3-4 years (General Fund), for the California Department of Fish and Wildlife (CDFW) to organize input from the department’s coastal regions (specifically, regions one, three, four, five, and seven); participate in the Working Group, Advisory Group, and public workshops; and assist with the development and review of the Roadmap.
- One-time costs, likely less than $1 million spread over 3-4 years (General Fund), for the California Environmental Protection Agency (CalEPA) to consult with the members of the Working Group to collaborate on the drafting and recommendations to be included in the Roadmap.
- One-time costs, likely less than $1 million spread over 3-4 years (General Fund), for the California Department of Transportation (Caltrans) to consultant services to participate in the Advisory Group, participate in public workshops, and assist with the development and review of the Roadmap and legislative reforms resulting from recommendations made in the Roadmap.
Author Amendments:
Author amendments would revise the composition of the Coastal Resilience Permitting Working Group, the Coastal Resilience Permit Advisory Group, and the public workshops to include the State Water Resources Control Board and representatives from the Regional Water Quality Control Boards in place of the specified regional water boards, and to extend the deadline for submitting the Coastal Resilience Permitting Roadmap to the Governor and the Legislature from January 1, 2028, to July 1, 2028, among other things. Specifically, these amendments would:
- Replace, in the Coastal Resilience Permitting Working Group membership list, the entry naming the California Regional Water Quality Control Boards for San Francisco Bay, North Coast, Central Coast, Los Angeles, Santa Ana, and San Diego with an entry naming the State Water Resources Control Board and representatives from the Regional Water Quality Control Boards.
- Strike the standalone State Water Resources Control Board entry from the Working Group membership list, now carried in the combined entry.
- Extend the deadline for the Secretary of the Natural Resources Agency to submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature from January 1, 2028, to July 1, 2028.
- Replace, among the entities with which the Secretary convenes the Coastal Resilience Permit Advisory Group, the California Regional Water Quality Control Boards with jurisdiction over the California coast and San Francisco Bay with the State Water Resources Control Board and representatives from the Regional Water Quality Control Boards.
- Provide that Coastal Resilience Permit Advisory Group membership may, rather than shall, include the listed representatives.
- Narrow the wastewater treatment agencies in the Advisory Group membership list to agencies that serve jurisdictions subject to Division 20.6.9 (commencing with § 30985).
- Make the same water boards substitution in the provision requiring the Secretary to conduct public workshops with the Advisory Group.
-- END --
SENATE COMMITTEE ON
Senator Sabrina Cervantes, Chair
2025 - 2026 Regular Session
AB 2051 (Wicks) - Public resources: Coastal Resilience Permitting Working Group
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would require the Secretary of the California Natural Resources Agency (CNRA) to convene a Coastal Resilience Permitting Working Group (Working Group) for the purpose of developing a Coastal Resilience Permitting Roadmap (Roadmap) to accelerate coastal resilience projects.
Fiscal Impact:
- CNRA estimates General Fund costs of approximately $769,000 over two years to facilitate interagency collaboration, public workshops, development of the Roadmap, and other deliverables required by the bill. According to CNRA, these resources will support one limited-term senior environmental scientist position as well as consulting services (external or interagency) for facilitation, logistics, communications, audio-visual services, and document design support for Roadmap deliverables.
- The California Coastal Commission estimates annual General Fund costs of approximately $1.1 million in 2027 and 2028 for five limited-term staff to help develop relevant components of the Roadmap, including recommendations across 10 topic areas, new state agency mitigation processes, proposed legislative reforms, alternatives analyses, evaluation of the efficacy of offshore wind project permitting practices, and more. These staff will participate in the Advisory Group and hold multi-agency workshops to solicit feedback on existing agency processes and draft reform proposals for the Roadmap.
- The State Water Board and Regional Water Boards estimate ongoing costs of about $5 million annually (General Fund, Waste Discharge Permit Fund, or other fund) to support state and regional board participation in the creation of Coastal Resilience Permitting Roadmap, including expansive subject matter expertise, developing recommendations, participating in statewide public workshops, providing legal consultation, and ensuring the necessary internal operational support to carry out the bill’s provisions. In addition, the State Water Board anticipates that the scale of the required implementable solutions required by this bill’s provisions would cost millions more ongoing, with significant information technology resources required to develop unified applications on a statewide or regional scale.
- The San Francisco Bay Conservation and Development Commission.(BCDC) estimates ongoing costs of about $1.1 million annually (General Fund) to assist with development of the Roadmap and implement reforms identified by the Working Group. This estimate also includes the cost of contracting with a vendor to perform an assessment of BCDC’s workforce as well as resources for additional office space (as BCDC’s headquarters in San Francisco is at capacity.) BCDC notes that without additional positions and contracting resources, BCDC may need to utilize its existing permitting staff and its regulatory improvements team to implement this bill, thereby increasing permitting timelines and delaying implementation of BCDC’s preexisting efforts to improve permitting processes.
- The California Department of Fish and Wildlife (CDFW) estimates costs of approximately $270,000 in fiscal year (FY) 2027-28 and $262,000 in FY 2028-29 and FY 2029-30 (General Fund) for one limited-term senior environmental scientist to organize input from the department’s coastal regions (specifically, regions one, three, four, five, and seven); participate in the Working Group, Advisory Group, and public workshops; and assist with the development and review of the Roadmap. This estimate includes the cost of staff travel.
- The California Environmental Protection Agency (CalEPA) estimates ongoing costs of $208,000 annually (General Fund) to consult with the members of the Working Group to collaborate on the drafting and recommendations to be included in the Roadmap.
Background:
Sea level rise in California. The Ocean Protection Council's 2024 guidance projects sea levels most likely rising 0.8 feet above 2000 levels by 2050 and 1.6 to 3.1 feet by 2100, with local variation — Humboldt Bay among the locations likely to see more. Rising seas will bring more frequent coastal flooding and storm surge, threatening communities and infrastructure valued in the estimated hundreds of billions of dollars, with the cost of response also estimated in the billions.
Planning requirements. SB 272 (Laird, Chapter 384, Statutes of 2023) requires local governments along the coastline, including San Francisco Bay, to develop a sea level rise plan by January 1, 2034, submitted either as part of a local coastal program (LCP) to the California Coastal Commission or as a shoreline resiliency plan to BCDC. Local governments with approved plans receive funding priority, subject to appropriation, for the adaptation strategies and projects those plans identify. Both agencies were required to issue preparation guidelines by December 31, 2024. SB 272 built on SB 1 (Atkins, Chapter 236, Statutes of 2021), which sought to coordinate and fund state sea level rise preparation.
The coastal agencies. The McAteer-Petris Act (Government Code §§66600 et seq.) established BCDC in 1965 as a temporary agency; it was made permanent in 1969 after completion of the San Francisco Bay Plan. BCDC's jurisdiction covers the Bay and land within 100 feet of the shoreline, and since 2008 it has led the Bay Area's preparedness and resilience work on rising seas, tides, and storm surge. It approved SB 272 guidance in December 2024. The Coastal Commission, created by voter initiative in 1972 and made permanent by the Coastal Act (Public Resources Code §§30000 et seq.), plans for and regulates land and water use in the coastal zone, which excludes BCDC's Bay jurisdiction. Development there generally requires a coastal development permit from the Commission or from a local government with a certified LCP, judged against Coastal Act policies. In November 2024 the Commission adopted updated Sea Level Rise Policy Guidance covering guiding principles, best available science, step-by-step direction for addressing sea level rise in LCPs and permits including SB 272 implementation, and adaptation strategies.
Permitting complexity. As many as 16 federal and state agencies may have a role in permitting a coastal project, among them the U.S. Army Corps of Engineers, regional water quality control boards, the Coastal Commission, BCDC, the California Department of Fish and Wildlife (CDFW), the U.S. Fish and Wildlife Service, and the State Lands Commission — agencies with overlapping but distinct jurisdictions. The Assembly's Select Committee on Permitting Reform examined this in 2024 and identified best practices including frontloading planning, providing a clear and straightforward process, maximizing consistency across agencies, and pre-determining mitigation measures.
A working model. The San Francisco Bay Restoration Regulatory Integration Team (BRRIT) offers a demonstrated alternative. Convened by the San Francisco Bay Restoration Authority with U.S. EPA support, it brings dedicated staff from six permitting agencies — the Corps, USFWS, NOAA Fisheries, the San Francisco Bay Regional Water Quality Control Board, CDFW, and BCDC — together to improve permitting for multi-benefit habitat restoration projects and associated flood management and public access infrastructure, using preapplication consultation to accelerate review. All 11 fully permitted projects in BRRIT's 2025 Annual Report had permits issued within the target timeline; where partially permitted projects have missed it, the cause has been late changes to conditions, such as changes to federally listed species.
Mitigation approaches. CEQA guidelines mandate mitigation whenever a project may significantly affect the environment, and where habitat such as wetland is damaged, required mitigation frequently involves restoring, enhancing, or preserving comparable habitat. Advance mitigation compensates for impacts before they occur, permitting landscape-level planning, more efficient permitting, and no temporal loss of habitat; CDFW administers advance mitigation through conservation and mitigation banking and the voluntary Regional Conservation Investment Strategies program, which encourages landscape-scale assessment and planning to yield higher ecological benefit than project-by-project efforts. Self-mitigation avoids offsite compensatory mitigation by building habitat features and nature-based solutions into project design and construction.
Proposed Law:
This bill would:
- Require the Secretary of CNRA, in consultation with the Secretary of CalEPA, to convene a Working Group and to develop a Roadmap with recommendations for process improvements and legislative reforms to enable efficient and timely delivery of environmental approvals, due to the Governor and the Legislature by January 1, 2028.
- Require the Working Group to consist of representatives from federal, state, and local agencies, including the Coastal Commission, CalEPA, CDFW, the Governor's Office of Land Use and Climate Innovation, CNRA, the Ocean Protection Council, BCDC, the State Coastal Conservancy, the State Lands Commission, the State Office of Historic Preservation, the State Water Board, and the San Francisco Bay, North Coast, Central Coast, Los Angeles, Santa Ana, and San Diego Regional Water Quality Control Boards.
- Require the Roadmap to include, at minimum, recommendations addressing:
- Administrative reforms implementable within existing agency authority, including improving efficiency in completeness determinations through preapplication consultations and clear permit guidelines; unified applications; interagency project management teams modeled on the BRRIT; methods to standardize compensatory mitigation, as applicable and feasible, including rewarding engineering with nature features to enable self-mitigation and consideration of thresholds for small amounts of fill that may not require mitigation; expanded regional general permits and programmatic agreements; process improvements allowing permit approval while design is being developed or complete and maintaining approval through nonsubstantive design changes; standard measures for borings, pile driving, and fill placement; and expedited permitting of projects in local sea level rise adaptation plans as an incentive to complete those plans.
- A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation.
- Legislative reforms with the greatest potential to accelerate permitting, and identification of regulatory gaps that could lead to maladaptation.
- A pilot program, if needed to test alternative approaches, and an evaluation of whether consolidated permits similar to those for offshore wind would facilitate timely permits.
- A workforce assessment and funding options for regulatory staffing and permitting support contracts, including analysis of pay scales needed to recruit and retain staff.
- Require the CNRA Secretary, on or before April 1, 2027, to convene a Coastal Resilience Permit Advisory Group including state permit-seeking agencies, local governments required to update their LCPs for sea level rise, ports, local transportation agencies, special districts, stormwater management and wastewater treatment agencies, California Native American tribes on the Native American Heritage Commission contact list, and members of the public including academics, businesses, builders, fishers, environmental and environmental justice organizations, and professional associations.
- Require the CNRA Secretary to conduct public workshops with the Advisory Group to solicit feedback on permitting challenges and to review draft reform proposals for potential inclusion in the Roadmap.
- Provide that when developing infrastructure to address adaptation, where feasible, a project alternative should be developed using existing or restored natural features and ecosystem processes to meet the project's goals.
- Define "coastal resilience project" as a project that maintains, protects, restores, or enables coastal ecosystems, infrastructure, or communities to withstand and adapt to sea level rise and other natural hazards, including those amplified by climate change.
- Make relevant legislative findings and declarations.
Related Legislation:
AB 996 (Pellerin, Chapter 286, Statutes of 2025) establishes an early consultation framework between a local government and the Coastal Commission prior to a local government’s submission of a LCP or LCP amendment in order to facilitate Coastal Commission certification of the LCP or LCP amendment, including to meet sea level rise planning requirements, as provided.
SB 272 (Laird, Chapter 384, Statutes of 2023) requires a local government in the coastal zone or within the San Francisco Bay to develop a sea level rise plan as part of either a LCP or a shoreline resiliency plan that includes certain information, including sea level rise adaptation strategies and recommended projects; requires local governments to comply by January 1, 2034, as specified; and prioritizes funding for implementation of sea level rise adaptation strategies in approved plans, among other things.
SB 867 (Laird, 2022) would have required local governments in the coastal zone or within the jurisdiction of BCDC to implement sea level rise planning and adaptation, as specified, and would have prioritized funding for local government projects implementing an approved sea level rise adaptation plan, among other things. (This bill was vetoed by Governor Newsom.)
SB 1 (Atkins, Chapter 236, Statutes of 2021) establishes the California Sea Level Rise State and Regional Support Collaborative at the Ocean Protection Council to help coordinate and fund state efforts to prepare for sea level rise associated with climate change, and provides up to $100M state funding annually to address sea level rise, among other things.
AB 72 (Petrie Norris, Chapter 369, Statutes of 2021) promotes the use of natural infrastructure to attenuate coastal hazards as part of climate adaptation, among other things.
AB 65 (Petrie-Norris, Chapter 347, Statutes of 2019) requires the State Coastal Conservancy to prioritize projects that provide natural infrastructure and multiple public benefits when allocating certain state monies.
Staff Comments:
According to the State Water Board, its current fiscal projection reflects the operational reality of Regional Board involvement in coastal resilience projects. The necessity for multiple positions per region—rather than a single representative, or a flexible, coordinated role across the Water Boards—stems from the high level of prescription in the bill. According to the Water Board, as currently drafted, the bill would mandate a level of granular technical expertise that no single individual can provide across the diverse regulatory portfolio of a regional board. Unlike agencies that may oversee one or two permits, regional boards manage an array of regulatory programs. A single coastal resilience project may trigger requirements across several distinct permits such as 401 certifications, NPDES, WDRs, MS4s, etc. This level of specificity contributes to the bill’s estimated costs.
-- END --
SENATE COMMITTEE ON NATURAL RESOURCES AND WATER
Senator Josh Becker, Chair
2025 - 2026 Regular
Bill No: AB Hearing Date: July 1, 2026
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
Subject: Public resources: Coastal Resilience Permitting Working Group
SUMMARY
This bill would require the Secretary of the California Natural Resources Agency to convene a Coastal Resilience Permitting Working Group to develop a Coastal Resilience Permitting Roadmap with recommendations for process improvements and legislative reforms to enable efficient environmental permitting of coastal resilience projects statewide, as provided.
BACKGROUND AND EXISTING LAW
Sea Level Rise in California.
In 2024, the Ocean Protection Council released sea level rise guidance suggesting that sea levels in California will most likely rise 0.8 feet above 2000 levels by 2050 and 1.6–3.1 feet by 2100. Local impacts may vary, with some locations, like Humboldt Bay, likely to see higher sea level rise. With the rise in sea level, more frequent coastal flooding and storm surge will occur, threatening communities and infrastructure along the coast, placing infrastructure in the estimated hundreds of billions of dollars at risk. The cost to address sea level rise is also estimated in the billions of dollars.
Planning for Sea Level Rise.
In order to ensure proactive sea level rise planning occurs in the state, SB 272 (Laird, Chapter 384, Statutes of 2023) requires local governments along the coastline, including San Francisco Bay, to develop a sea level rise plan by January 1, 2034 as part of either a local coastal program (LCP) submitted to the California Coastal Commission (Coastal Commission) or a shoreline resiliency plan submitted to the San Francisco Bay Conservation and Development Commission (BCDC). Local governments with approved sea level rise plans are prioritized for funding, subject to appropriation, for the implementation of identified sea level rise adaptation strategies and recommended projects identified in their plans. The Coastal Commission and BCDC were both required to provide guidelines for preparation of sea level rise plans by December 31, 2024.
SB 272 built upon the goals established in SB 1 ((Atkins), Chapter 236, Statutes of 2021) to help coordinate and fund state efforts to prepare for sea level rise associated with climate change, among other things.
The state’s coastal agencies.
In 1965, the McAteer-Petris Act (Government Code (GOV) §§66600 et seq.) established BCDC. Although created as a temporary state agency, BCDC was made permanent in 1969 following the completion of the San Francisco Bay Plan (Bay Plan), a comprehensive plan that addresses the development of the bay and shoreline. BCDC’s jurisdiction includes the San Francisco Bay and the land within 100 feet of the shoreline, as provided. Since 2008, BCDC has been the state agency responsible for leading the San Francisco Bay area’s preparedness for, and resilience to, rising sea levels, tides, and storm surge due to climate change. BCDC is required to address emerging issues and keep the Bay Plan up-to-date. In December 2024, BCDC approved guidance in order to comply with SB 272’s directive.
The Coastal Commission was established by voter initiative in 1972. The Legislature later made the Coastal Commission permanent through the adoption of the California Coastal Act of 1976 (Coastal Act) (Public Resources Code (PRC) §§30000 et seq.). The Coastal Commission plans for and regulates the use of land and water in the coastal zone (which excludes BCDC’s jurisdiction in the San Francisco Bay).
Development activities in the coastal zone generally require a coastal development permit (CDP) issued by the Coastal Commission or by a local government with a LCP certified by the Coastal Commission. Coastal Act policies are the standards the Coastal Commission uses to determine the permissibility of proposed developments subject to its jurisdiction.
In November 2024, the Coastal Commission adopted an updated Sea Level Rise Policy Guidance. The Guidance includes guiding principles for addressing sea level rise in the coastal zone, a discussion of the best available science, step-by-step guidance for addressing sea level rise in LCPs and CDPs, including implementation of SB 272, and possible adaptation strategies, and other provisions.
Permitting requirements for coastal projects.
According to the Assembly Natural Resources Committee, as many as 16 federal and state permitting agencies may have a role in the permitting for coastal projects.[1] Federal and state agencies involved may include the US Army Corps of Engineers (USACOE), regional water quality control boards, the Coastal Commission, BCDC, the California Department of Fish and Wildlife (CDFW), the US Fish and Wildlife Service (USFWS), the State Lands Commission, and others, with overlapping, but distinct, jurisdictions.
Permit streamlining.
Given the complexity of navigating permitting from multiple agencies, in 2024 the Assembly investigated permitting in California through its Select Committee on Permitting Reform. In its final report, the Select Committee identified several best practices, including frontloading planning, providing a clear and straightforward process, maximizing consistency across permitting agencies, and pre-determining mitigation measures.
The San Francisco Bay Restoration Regulatory Integration Team (BRRIT).
The San Francisco Bay Restoration Authority, with support from the U.S. Environmental Protection Agency, convenes dedicated staff from six permitting agencies (USACOE, USFWS, National Oceanic and Atmospheric Administration (NOAA) Fisheries, the San Francisco Bay Regional Water Quality Control Board, CDFW, and BCDC) to improve the permitting process for multi-benefit habitat restoration projects and associated flood management and public access infrastructure. The resulting coordinating group, BRRIT, uses pre-application consultation to accelerate the permitting process. Of the 11 fully-permitted projects identified in the BRRIT 2025 Annual Report, 100% had all permits issued within the target timeline. Where some partially-permitted projects have not met the target timeline, this has been due to late changes to conditions (for example, changes to listed species under the federal Endangered Species Act).
Mitigation, advance mitigation, and self-mitigation.
According to the Assembly Natural Resources Committee, mitigation is mandated by California Environmental Quality Act guidelines whenever a project may result in significant impact to the environment. These requirements exist to ensure that California’s natural resources are preserved and protected into the future, for the benefit of all. When habitat (such as a wetland) is damaged by a project, the required mitigation for that damage frequently includes the restoration, enhancement, and/or preservation of comparable habitat. In “advance mitigation,” efficiencies can be obtained by compensating for impacts before they occur. This allows for landscape-level planning, more efficient permitting, and no temporal loss of habitat. Programs for advance mitigation through CDFW include conservation and mitigation banking and the Regional Conservation Investment Strategies (RCIS) program which is a voluntary program that encourages conservation assessments and planning at a landscape level in order to provide opportunities for large-scale conservation and mitigation projects resulting in higher ecological benefits than project-by-project efforts, according to CDFW.
“Self-mitigation,” in order to avoid the requirement for off-site compensatory mitigation, can be accomplished by implementing habitat features and incorporating nature-based solutions in project design and construction.
Existing law:
- Establishes the Coastal Act which:
- Establishes the Coastal Commission in the California Natural Resources Agency (CNRA).
- Requires each local government in the coastal zone to prepare a LCP for that portion of the coastal zone within its jurisdiction, as provided. Requires the precise content of each LCP to be determined by the local government in full consultation with the Coastal Commission and full public participation. (PRC §30500)
- Provides for the planning and regulation of development within the coastal zone.
- A person planning to perform or undertake any development in the coastal zone is required to obtain a CDP from the Coastal Commission or local government enforcing a LCP certified by the Coastal Commission.
- The coastal zone means the coastal land and waters of California, and includes the lands that extend inland generally 1,000 yards from the mean high tide line, as specified, with various exceptions including the San Francisco Bay.
- Development means, among other things, the placement or erection of any solid material or structure on land or in water.
- Requires the Coastal Commission to take into account the effects of sea level rise in coastal resources planning and management policies and activities in order to identify, assess, and, to the extent feasible, avoid and mitigate the adverse effects of sea level rise. (PRC §30270)
- Establishes BCDC: (GOV §§66600 et seq.)
- BCDC, among other things, is required to address emerging issues and to implement comprehensive plans for the preservation and protection of San Francisco Bay and the Suisun Marsh, including preparedness for, and resilience to, rising sea levels, tides, and storm surge due to climate change. BCDC has adopted the San Francisco Bay Plan, which is a comprehensive plan that addresses the development of the bay and shoreline.
- Requires a local government lying within the coastal zone or the San Francisco Bay shoreline to develop a sea level rise plan as part of a LCP or subregional San Francisco Bay shoreline resiliency plan subject to BCDC’s approval.
- Requires the sea level rise plan to include the use of best available science, a vulnerability assessment to ensure equity for at-risk communities, sea level rise adaptation strategies and recommended projects, identification of lead planning and implementation agencies, and a timeline for updates to the plan. Requires that the timeline include economic impact analyses of costs to critical public infrastructure and recommended approaches for implementing sea level rise, as provided.
- Requires local governments to comply by January 1, 2034.
- Requires the Coastal Commission and BCDC to establish guidelines for the sea level rise plan, as provided.
- Requires local governments that receive Coastal Commission or BCDC approval of their sea level rise plans be prioritized for funding, subject to appropriation, for the implementation of sea level rise adaptation strategies and recommended projects in the approval sea level rise plan. (PRC §§30985, 30985.2, 30985.5)
PROPOSED LAW
This bill would:
- Require the Secretary of the California Natural Resources Agency (CNRA Secretary) to develop a Coastal Resilience Permitting Roadmap (Roadmap) with recommendations for process improvements and legislative reforms to enable efficient and timely delivery of environmental approvals by January 1, 2028.
- Require the CNRA Secretary, in consultation with the Secretary of the California Environmental Protection Agency (CalEPA), to convene a Coastal Resilience Permitting Working Group (Working Group) for the purpose of developing the Roadmap.
- Require that the Working Group consist of representatives from federal, state, and local agencies, including but not limited to:
- The Coastal Commission;
- CalEPA;
- The San Francisco Bay, North Coast, and Central Coast Regional Water Quality Control Boards (Regional Water Boards);
- CDFW;
- The Governor’s Office of Land Use and Climate Innovation;
- CNRA;
- The Ocean Protection Council;
- BCDC;
- The State Coastal Conservancy;
- The State Lands Commission;
- The State Office of Historic Preservation; and
- The State Water Resources Control Board (State Water Board).
- Require that the Roadmap include, at minimum, recommendations that address:
- Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including:
- Streamlining the process for determining that applications are complete, including limits on additional information requests when applicants submit complete applications consistent with permit guidelines and timelines for initial and successive reviews;
- Unified applications with a predictable sequence and timeline;
- Statewide or regional interagency project management teams for multiagency permitting, modeled on the BRRIT;
- Methods to standardize compensatory mitigation across agencies, including the consideration of engineering with nature features to enable projects to self-mitigate and a potential de minimis fill policy that allows de minimis fill within defined thresholds without the need to mitigate;
- Delegating permit issuance to executive officers or using consent calendars when appropriate and applicable;
- Expanded use of regional general permits and programmatic agreements for known categories of coastal resilience projects;
- Process improvements that allow for permit approval when the design is complete or during the preapplication process, and for subsequent design changes arising from field conditions and in-depth engineering analysis;
- Standard measures that can be applied to pile driving and fill placement techniques, and other practices that are known to safeguard marine resources, including the types of conditions under which these measures should be utilized and can be scaled to varying project scope and footprint, taking into consideration variability across the ocean floor topographies;
- Recommendations for how to expedite and streamline the permitting of projects included in local sea level rise adaptation plans, as an incentive to complete and implement local plans; and
- Consideration of project-based permit streamlining.
- A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, thereby avoiding temporal loss of habitat and associated increased mitigation requirements, and reducing the need for individual applicants to develop and implement project-specific compensatory mitigation;
- Legislative reforms that have the greatest potential to further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements that result in extensive analysis that could be avoided by application of standardized compensatory mitigation, advance mitigation, or standard construction practices, as well as identification of regulatory gaps and frictions that could lead to maladaptation over time;
- A coastal resilience project pilot program and any required legislative authorizations, if needed to test alternative approaches;
- An evaluation of whether consolidated coastal resilience permits, similar to those provided for offshore wind, would facilitate timely permits; and
- Workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, including a specific analysis of recommended pay scales needed to recruit and retain permitting staff that reflects the educational requirements for these positions, the cost of living in areas where these staff live and work, and private sector compensation for similar skills.
- Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including:
- Require, on or before April 1, 2027, the CNRA Secretary, in collaboration with the commission, BCDC, CDFW, and the Regional Water Boards, convene a Coastal Resilience Permit Advisory Group (Advisory Group), consisting of representatives from at least the following:
- State Department of Transportation, State Coastal Conservancy, and other relevant state agencies that seek permits for projects in coastal areas;
- Local governments required to update their LCPs for sea level rise;
- California ports;
- Local transportation agencies and wastewater treatment agencies;
- California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission; and
- Other members of the public, including businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, and environmental justice organizations.
- Require the CNRA Secretary, in consultation with the Coastal Commission, BCDC, CDFW, and the Regional Water Boards to conduct a series of public workshops with the Advisory Group or subgroups thereof to:
- Solicit feedback regarding challenges with existing permitting processes, and recommendations and concerns from permittees and other interested parties regarding streamlining proposals; and
- Review and seek comment on draft reform proposals from the Working Group’s Roadmap.
- Define “coastal resilience project” as a project that maintains, protects, restores, or enables coastal ecosystems, infrastructure, or communities to withstand and adapt to sea level rise and other natural hazards amplified by climate change.
- Make relevant legislative findings and declarations.
ARGUMENTS IN SUPPORT
According to the author, “AB 2051 directs the Natural Resources Agency to convene a Coastal Resilience Permitting Working Group, who will meet to develop a Roadmap for projects proposed along California’s coast and in the San Francisco Bay.”
“Under current law, a project sponsor on the coast may need to secure more than ten separate permits from state, federal, and local agencies. The process is beset by redundant and inconsistent application requirements, no aligned review timelines, sequential rather than concurrent permit processing, no single lead agency to coordinate or resolve conflicts, and chronic staffing vacancies in agencies that require highly specialized expertise.”
“Decades worth of well-meaning permitting processes are overlaid on top of one another, and it is still too expensive and time-consuming to move with the speed and cost efficiency our coastline is going to need to adapt to sea-level rise and an altered climate.”
“AB 2051 does not change existing permitting requirements or weaken any environmental protection. An advisory group mandated in the bill is specifically charged to ensure that streamlining efforts do not weaken protections for fish and wildlife habitat, tribal cultural resources, or public access. The bill sets California on a path that will lead to actionable recommendations that improve permit issuance timelines, align mitigation requirements, accelerate permitting, and assess how to recruit and retain essential permitting staff.”
ARGUMENTS IN OPPOSITION
None received
COMMENTS
Benefits of early agency coordination. As noted in the background, the potential impacts of sea level rise on the state’s coastline are anticipated to be extensive with significant damage, loss, and expense anticipated to public safety, infrastructure, and the environment, among other things. Facilitating early discussions and coordination among project proponents and permitting agencies can help identify challenges before a permit from one agency becomes delayed with cascading impacts to subsequent approvals (in other words, certain agency permitting decisions rely upon permits issued by other agencies).
The BRITT, described in the background, appears to be an effective model for coordination among agencies to spur permitting for certain projects. Additionally, both BCDC and the Coastal Commission have accelerated permitting pathways for projects with a nominal impact on the surrounding environment.
Clarifying amendments. The author proposed largely clarifying and technical amendments to the Committee after the Committee deadline. Upon review and discussion among the author, stakeholders and Committee staff, additional nominal changes were agreed to. Of particular note, the author proposed the addition of language promoting the use of nature-based solutions, where feasible, as proposed by Save the Bay and others.
The Committee may wish to amend the bill to incorporate these agreed-upon changes. [Amendment #1]
Further, the author may wish to consider whether the deadlines required for the study are workable in view of the looming transition with the election of a new governor in November. The author may also wish to consider placing a cap on the number of Advisory Group members to help ensure that it remains an efficient size.
Recent related legislation
AB 996 (Pellerin, Chapter 286, Statutes of 2025) establishes an early consultation framework between a local government and the Coastal Commission prior to a local government’s submission of a LCP or LCP amendment in order to facilitate Coastal Commission certification of the LCP or LCP amendment, including to meet sea level rise planning requirements, as provided.
SB 272 (Laird, Chapter 384, Statutes of 2023) requires a local government in the coastal zone or within the San Francisco Bay to develop a sea level rise plan as part of either a LCP or a shoreline resiliency plan that includes certain information, including sea level rise adaptation strategies and recommended projects; requires local governments to comply by January 1, 2034, as specified; and prioritizes funding for implementation of sea level rise adaptation strategies in approved plans, among other things.
SB 867 (Laird, 2022) would have required local governments in the coastal zone or within the jurisdiction of BCDC to implement sea level rise planning and adaptation, as specified, and would have prioritized funding for local government projects implementing an approved sea level rise adaptation plan, among other things. (This bill was vetoed by Governor Newsom.)
SB 1 (Atkins, Chapter 236, Statutes of 2021) establishes the California Sea Level Rise State and Regional Support Collaborative at the Ocean Protection Council to help coordinate and fund state efforts to prepare for sea level rise associated with climate change, and provides up to $100M state funding annually to address sea level rise, among other things.
AB 72 (Petrie Norris, Chapter 369, Statutes of 2021) promotes the use of natural infrastructure to attenuate coastal hazards as part of climate adaptation, among other things.
AB 65 (Petrie-Norris, Chapter 347, Statutes of 2019) requires the State Coastal Conservancy to prioritize projects that provide natural infrastructure and multiple public benefits when allocating certain state monies.
SUGGESTED AMENDMENTS
AMENDMENT 1
Revise AB 2051 according to the mock-up below:
30990. (a) The Legislature finds and declares all of the following:
(1) The Ocean Protection Council’s 2024 State of California Sea Level Rise Guidance includes a projection that by the year 2100, statewide averaged sea levels are expected to rise between 1.6 feet and 3.1 feet under the Intermediate-Low and Intermediate Scenarios.
(2) The Ocean Protection Council’s guidance also notes that higher amounts of up to 6.6 feet or more of sea level rise in very high risk, low-probability cases cannot be ruled out.
(3) In 2023, the Metropolitan Transportation Commission of the San Francisco Bay area, in consultation with the Association of Bay Area Governments and the San Francisco Bay Conservation and Development Commission, published the Sea Level Rise Adaptation Funding and Investment Framework Final Report with an estimate of one hundred ten billion dollars ($110,000,000,000) to adapt San Francisco Bay communities and critical infrastructure to sea level rise by 2050.
(4) In 2024, the Legislature adopted Division 20.6.9 (commencing with Section 30985) requiring the California Coastal Commission and the San Francisco Bay Conservation and Development Commission to publish guidelines for the preparation of sea level rise plans and for local communities to seek review and approval of these plans by 2034 to remain eligible for resilience funding from the state.
(5) Construction activities along the California coast and in the San Francisco Bay in federal waters are regulated by a wide range of state and federal agencies operating under a comprehensive set of state and federal environmental laws.
(6) California promotes the use of “natural infrastructure,” where feasible, to build coastal resilience, which is described in Section 71154 of the Public Resources Code as using natural ecological systems or processes to reduce vulnerability to climate change related hazards, or other related climate change effects, while increasing the long-term adaptive capacity of coastal and inland areas by perpetuating or restoring ecosystem services.
(6) The National Oceanic and Atmospheric Administration’s North-Central California Coastal Sediment Coordination Committee published a 2024 Efficient Permitting Roadmap that provides a description of permitting roles for state and federal agencies and preferred approaches for habitat restoration projects.
(7) Together, these laws and the work of these agencies, provide critical protection for the health of the Pacific Ocean and the San Francisco Bay.
(8) The combination of overlapping, and sometimes duplicative, federal and state authorities, requirements for project-specific studies, limited regulatory agency staffing, interagency coordination needs, and inconsistency and uncertainty regarding mitigation requirements can results in extended permitting timelines for all projects in or adjacent to federal waters, including coastal resilience projects.
(9) Permitting staff positions at relevant agencies require extensive education and experience regarding complex ecosystems and marine environments, and related expertise such as knowledge of historic and cultural resources.
(10) Numerous reports, including the California Coastal Commission 2021–2025 Workforce Plan, the University of California Berkeley Labor Center’s “Civil Service Vacancies in California: 2022–2023,” the Central Coast Regional Water Quality Control Board’s 2022 Executive Officer’s Report, and the 2025 National Conference of State Historic Preservation Officer’s Workforce Report, document the challenge of recruiting and retaining qualified staff to process complicated permit applications.
(11) The Governor and the Legislature have previously addressed permitting timelines and processes related to rebuilding after natural disasters such as the January 2025 wildfires, and to facilitate timely development and permitting of offshore wind and transmission facilities in the state.
(12) The Assembly Select Committee on Permitting Reform issued a report in 2025 documenting the permitting challenges that most project face trying to navigate the 7 to 12 agencies that have regulatory jurisdiction over resiliency projects. This report recommended eliminating uncertainty in the application process, enhancing interagency coordination and consistency, and creating distinct permitting pathways for drought resilience and flood risk reduction projects.
(b) Given the myriad of benefits from coastal resilience projects to California communities, the Secretary of the Natural Resources Agency shall develop a Coastal Resilience Permitting Roadmap with recommendations for process improvements and legislative reforms that will enable efficient and timely delivery of environmental approvals for these projects, as provided in Section 30991.
30991. (a) (1) The Secretary of the Natural Resources Agency, in consultation with the Secretary for Environmental Protection, shall convene a Coastal Resilience Permitting Working Group for the purpose of developing a Coastal Resilience Permitting Roadmap for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and in and adjacent to state and federal waters.
(2) The Coastal Resilience Permitting Working Group shall consist of representatives from federal, state, and local agencies, including, but not limited to, representatives from all of the following entities:
(A) The California Coastal Commission.
(B) The California Environmental Protection Agency.
(C) The California Regional Water Quality Control Boards, San Francisco Bay, North Coast, and Central Coast, Los Angeles, Santa Ana, and San Diego.
(D) The Department of Fish and Wildlife.
(E) The Governor’s Office of Land Use and Climate Innovation.
(F) The Natural Resources Agency.
(G) The Ocean Protection Council.
(H) The San Francisco Bay Conservation and Development Commission.
(I) The State Coastal Conservancy.
(J) The State Lands Commission.
(K) The State Office of Historic Preservation.
(L) The State Water Resources Control Board.
(3) Development of the Coastal Resilience Permitting Roadmap shall incorporate, but not delay, progress to advance responsible permitting and development of coastal resilience projects.
(b) (1) On or before January 1, 2028, the Secretary of the Natural Resources Agency shall submit the Coastal Resilience Permitting Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature.
(2) The plan submitted to the Legislature pursuant to paragraph (1) shall be submitted in compliance with Section 9795 of the Government Code.
(3) Pursuant to Section 10231.5 of the Government Code, this subdivision shall become inoperative on January 1, 2032.
(c) The Coastal Resilience Permitting Roadmap developed pursuant to paragraph (1) of subdivision (a) shall include, at a minimum, recommendations that address all of the following:
(1) Administrative reforms that can be implemented by state agencies, to the extent feasible, within their existing authority to improve permit issuance timelines, including all of the following:
(A) Streamlining the process for determinations that applications are complete including limits on additional information requests when applicants submit complete applications consistent with permit guidelines, and timelines for initial and successive reviews.
Improving efficiency in the process for agencies to determine and communicate that permit applications are complete, through the use of tools such as pre-application consultations, publishing clear permit guidelines, minimizing additional information requests when applicants submit complete applications consistent with permit guidelines, and setting timelines for initial and successive reviews.”
(B) Unified applications with a predictable sequence and timeline of permitting information requests and interagency reviews.
(C) Statewide or regional interagency project management teams for multiagency permitting, modeled on the Bay Restoration Regulatory Integration Team.
(D) Methods to standardize compensatory mitigation across agencies, as applicable and feasible, including rewarding the consideration of engineering with nature features to enable projects to self-mitigate, and the consideration of types and thresholds for small amounts of fill that may not require mitigation because they may be beneficial or can be shown to have negligible impacts and a potential de minimis fill policy that allows de minimis fill within defined thresholds without the need to mitigate.
(E) Delegating permit issuance to executive officers or using consent calendars when appropriate and applicable.
(F) Expanded use of regional general permits and programmatic agreements for known categories of coastal resilience projects.
(G) Process improvements that allow for permit approval when the design is being developed or is complete or during the preapplication process, and for permit approval to be maintained during subsequent non-substantive design changes arising from field conditions and in-depth engineering analysis.
(H) Standard measures and methods that can be applied to borings, pile driving and fill placement techniques, and other practices that are known to safeguard marine resources, including the types of conditions under which these measures should be utilized and can be scaled to varying project scope and footprint, taking into consideration variability across the ocean floor topographies.
(I) Recommendations for how to expedite and streamline the permitting of projects included in local sea level rise adaptation plans, as required by the Regional Shoreline Adaptation Plan (BPA 1-24) adopted by the San Francisco Bay Conservation and Development Commission and by the Sea Level Rise Policy Guidance adopted by the California Coastal Commission, respectively, as an incentive to complete and implement local plans.
(J) Consideration of project-based permit streamlining.
(2) A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, thereby avoiding temporal loss of habitat and associated increased mitigation requirements, and reducing the need for individual applicants to develop and implement project-specific compensatory mitigation projects.
(3) Legislative reforms that have the greatest potential to further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements that result in extensive analysis that could be avoided by application of standardized compensatory mitigation, as feasible and appropriate, advance mitigation, or standard construction practices, as well as identification of regulatory gaps and frictions that could lead to maladaptation over time.
(4) If needed to test alternative approaches, a coastal resilience project pilot program along with any required legislative authorizations to evaluate the effectiveness of recommended reforms and environmental protection methods.
(5) An evaluation of whether consolidated coastal resilience permits similar to those provided in Division 20 (commencing with Section 30000) for offshore wind projects would facilitate timely permits.
(6) A workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, including a specific analysis of recommended pay scales needed to recruit and retain permitting staff that reflect the educational requirements for these positions, the cost of living in areas where these staff live and work, and private sector compensation for similar skills.
(d) To support deliberations of the Coastal Resilience Permitting Working Group, on or before April 1, 2027, the Secretary of the Natural Resources Agency, in collaboration with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, and the California Regional Water Quality Control Boards with jurisdiction over the California coast and San Francisco Bay, shall convene a Coastal Resilience Permit Advisory Group. Coastal Resilience Permit Advisory Group membership shall include, but not be limited to, representatives of each of the following:
(1) The Department of Transportation, the State Coastal Conservancy, and other relevant state agencies that seek permits for projects in coastal areas.
(2) Local governments subject to the requirements of Division 20.6.9 (commencing with Section 30985).
(3) California ports.
(4) Local transportation agencies, special districts, stormwater management agencies, and wastewater treatment agencies.
(5) California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission.
(6) Other members of the public, including academics, businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, environmental justice organizations, professional associations, and others.
(e) The Secretary of the Natural Resources Agency, in consultation with the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the Department of Fish and Wildlife, and the California Regional Water Quality Control Boards with jurisdiction over the California coast and San Francisco Bay, shall conduct a series of public workshops with the Coastal Resilience Permit Advisory Group or subgroups thereof to do all of the following:
(1) Solicit feedback regarding challenges with existing permitting processes, and recommendations and concerns from permittees and other interested parties regarding streamlining proposals.
(2) Review and seek comment on draft reform proposals from the Coastal Resilience Permitting Working Group’s for potential inclusion in the Coastal Resilience Permitting Roadmap.
(f) When developing infrastructure to address adaptation, where feasible, a project alternative should be developed that uses existing natural features and ecosystem processes or the restoration of natural features and ecosystem processes to meet the project’s goals.
(f) For purposes of this section, “coastal resilience project” means a project that maintains, protects, restores, or enables coastal ecosystems, infrastructure, or communities to withstand and adapt to sea level rise and other natural hazards, including those amplified by climate change.
SUPPORT
Bay Area Council (co-sponsor)
Bay Planning Coalition (co-sponsor)
AltaSea
California Broadband & Video Association (if amended)
California Coastal Protection Network (if amended)
California Shore & Beach Preservation Association
California State Association of Counties
City and County of San Francisco
City of Oceanside
City of Port Hueneme
City/County Association of Governments of San Mateo County
Coastal Quest
County of Los Angeles
County of Marin
County of Monterey
East Bay Dischargers Authority
East Bay Regional Park District
ECOncrete
Filoli
Kiewit Infrastructure West Company
Marin Community Foundation
McFadden Finch Holdings Company
One Shoreline
Orange County Transportation Authority
Planning and Conservation League (if amended)
Port of Redwood City
Port of San Francisco
San Francisco Bay Ferry
San Francisco International Airport
Santa Clara Valley Water District
Save the Bay (if amended)
SPUR Bay Area (if amended)
The Exploratorium
The Honorable Todd Gloria, Mayor, City of San Diego
The Nature Conservancy
Wareham Development
WILDCOAST
OPPOSITION
None received
-- END --
The number of agencies involved is from the National Oceanic and Atmospheric Administration’s North-Central California Coastal Sediment Coordination Committee’s Efficient Permitting Roadmap. ↑
ASSEMBLY THIRD READING
ATR Bill Id:AB 2051
Author:(Wicks)
As Amended Ver:March 25, 2026
Majority vote
SUMMARY
Requires the Secretary of the Natural Resources Agency (NRA), in consultation with the Secretary for Environmental Protection (CalEPA), to convene a Coastal Resilience Permitting Working Group (Working Group) for the purpose of developing a Coastal Resilience Permitting Roadmap (Roadmap) for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and in and adjacent to state and federal waters.
Major Provisions
- Requires the Secretary of NRA, in consultation with the Secretary for CalEPA, to convene a Working Group for the purpose of developing a Roadmap for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and in and adjacent to state and federal waters.
- Requires the Working Group to consist of representatives from federal, state, and local agencies, including, but not limited to specified representatives.
- Requires, on or before January 1, 2028, the Secretary of NRA to submit the Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature. Sunsets this requirement on January 1, 2032.
- Requires the Roadmap to include, at a minimum, recommendations that address:
- Specified permitting processes and timelines.
- A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation.
- Legislative reforms that can further accelerate permitting for projects that increase coastal resilience.
- If needed to test alternative approaches, a coastal resilience project pilot program along with any required legislative authorizations to evaluate the effectiveness of recommended reforms and environmental protection.
- An evaluation of whether consolidated coastal resilience permits similar to those provided for offshore wind projects would facilitate timely permits.
- A workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff.
- Requires, on or before April 1, 2027, the Coastal Commission and the Bay Conservation and Development Commission (BCDC), in collaboration with the California Department of Fish and Wildlife (CDFW), and the regional water boards with jurisdiction over the California coast and San Francisco Bay, to convene a Coastal Resilience Permit Advisory Group (Advisory Group). Requires the Advisory Group membership to include specified representatives.
- Requires the Coastal Commission and BCDC, in consultation with the CDFW, and the regional water boards, to conduct a series of public workshops with the Advisory Group.
COMMENTS
In 2024, the Select Committee on Permit Reform met to discuss permit challenges and permit process reform for infill housing, clean energy, transit, and climate resiliency projects. The resultant California Assembly Select Committee on Permitting Reform Final Report (March 2025) notes that despite permit reforms already undertaken, many stakeholders expressed concern that further permitting reform is necessary for the state to achieve its housing production goals, such as eliminating uncertainty in the application process; minimizing uncertainty in the entitlement process; creating more consistency across permitting entities; focusing on the California Environmental Quality Act and environmental issues; and, minimizing uncertainty for post-entitlement permits.
The report identified best practices for permitting reform, including prioritizing agency objectives and workload, providing a clear and straightforward permit application process, and establishing specific timeframes for reviewing permits.
This bill requires NRA to convene a Working Group to develop a Roadmap for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and make recommendations on myriad administrative reforms and alignment of agency requirements to streamline permitting processes and timeframes.
Numerous recent reports completed by agencies participating in the Working Group and/or Advisory Group have been published with recommendations to streamline the permitting process for coastal development projects. These reports can both inform the Roadmap and eliminate unnecessary redundancies in the Working Group's efforts.
According to the Author
The communities most at risk from climate change are disproportionately low-income and communities of color, located in low-lying areas adjacent to San Francisco Bay and the Pacific coast, with limited resources to self-finance adaptation. Every year of permitting delay is a year these communities remain exposed to harm they did not cause and cannot afford to absorb. AB 2051 would outline a process that could help accelerate the delivery of flood protection, wetland restoration, and shoreline adaptation infrastructure to the people who need it most…The bill's Coastal Resilience Permit Advisory Group is specifically charged with ensuring that streamlining efforts do not weaken protections for fish and wildlife habitat, tribal cultural resources, or public access.
Arguments in Support
California State Association of Counties writes that delivering needed climate resilience projects quickly and responsibly is essential. Unfortunately, California's current coastal permitting system is often fragmented and unpredictable, slowing urgently needed adaptation efforts and increasing costs, as illustrated by the California State Assembly Select Committee on Permitting Reform's final report. AB 2051 takes a thoughtful and collaborative approach to addressing these challenges. The bill directs the California Natural Resources Agency to convene an interagency Coastal Resilience Permitting Working Group to identify administrative improvements and develop a clear roadmap for streamlining permitting for coastal resilience projects.
Arguments in Opposition
None on file
FISCAL COMMENTS
According to the Assembly Appropriations Committee:
- NRA estimates General Fund costs of approximately $769,000 over two years to facilitate interagency collaboration, public workshops, development of the Roadmap, and other deliverables required by the bill.
- BCDC estimates ongoing annual General Fund costs of approximately $1.1 million to hire five staff to assist with development of the Roadmap and implement reforms identified by the Working Group.
- CDFW estimates General Fund costs of approximately $270,000 in fiscal year (FY) 2027-28 and $262,000 in FY 2028-29 and FY 2029-30 for one limited-term senior environmental scientist.
- The California Coastal Commission estimates annual General Fund costs of approximately $1.1 million in 2027 and 2028 for five limited-term staff to help develop relevant components of the Roadmap.
- CalEPA estimates ongoing annual General Fund costs of approximately $208,000 for one senior environmental scientist to consult with members of the Working Group and collaborate on the drafting of recommendations to be included in the Roadmap.
- The State Water Resources Control Board estimates ongoing annual costs of approximately $4.5 million (General Fund or Waste Discharge Permit Fund) for 18 positions to support participation by the state board and nine regional boards in the creation and implementation of the Roadmap.
VOTES
ASM NATURAL RESOURCES: 12-1-1
YES: Bryan, Alanis, Connolly, Garcia, Haney, Hoover, Kalra, Muratsuchi, Pellerin, Schultz, Wicks, Zbur
NO: Macedo
ABS, ABST OR NV: Ellis
ASM WATER, PARKS, AND WILDLIFE: 12-0-1
YES: Papan, Jeff Gonzalez, Alanis, Alvarez, Ávila Farías, Bains, Bennett, Boerner, Caloza, Hart, Muratsuchi, Rogers
ABS, ABST OR NV: Gallagher
ASM APPROPRIATIONS: 12-2-1
YES: Wicks, Hoover, Aguiar-Curry, Calderon, Caloza, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache
NO: Dixon, Tangipa
ABS, ABST OR NV: Ta
UPDATED
VERSION: March 25, 2026
CONSULTANT: Paige Brokaw / NAT. RES. / (916) 319-2092 FN: 0002643
Date of Hearing: April 29, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 2051
Author:(Wicks) – As Amended Ver:March 25, 2026
Policy Committee: | Natural Resources | Vote: | 12 - 1 |
Water, Parks and Wildlife | 12 - 0 | ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill requires the Secretary of the California Natural Resources Agency (CNRA), in consultation with the Secretary for Environmental Protection (CalEPA), to convene a Coastal Resilience Permitting Working Group (Working Group) for the purpose of developing a Coastal Resilience Permitting Roadmap (Roadmap) to accelerate coastal resilience projects.
Specifically, this bill, among other things:
- Requires the Secretary of CNRA, in consultation with the Secretary of CalEPA, to convene a Working Group for the purpose of developing a Roadmap for coastal resilience projects (as defined) proposed along the California coast and in the San Francisco Bay, and in and adjacent to state and federal waters; requires development of the Roadmap to incorporate, but not delay, progress to advance responsible permitting and development of coastal resilience projects; and requires the Working Group to consist of representatives from federal, state, and local agencies, as specified.
- Requires, on or before January 1, 2028, the Secretary of CNRA to submit the Roadmap to the Governor and Legislature, and sunsets this requirement on January 1, 2032.
- Requires the Roadmap to include recommendations that address numerous specified topics, including administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, a state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation, and a workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff. For a detailed summary, please see the Assembly Water, Parks, and Wildlife Committee’s analysis of this bill.
- To support deliberations of the Working Group, requires, on or before April 1, 2027, the Secretary of CNRA to, in collaboration with specified entities, convene a Coastal Resilience Permit Advisory Group (Advisory Group) and conduct a series of public workshops, as specified.
FISCAL EFFECT:
1) CNRA estimates General Fund costs of approximately $769,000 over two years to facilitate interagency collaboration, public workshops, development of the Roadmap, and other deliverables required by the bill. According to CNRA, these resources will support one limited-term senior environmental scientist position as well as consulting services (external or interagency) for facilitation, logistics, communications, audio-visual services, and document design support for Roadmap deliverables.
2) The Bay Conservation and Development Commission (BCDC) estimates ongoing annual General Fund costs of approximately $1.1 million to hire five staff to assist with development of the Roadmap and implement reforms identified by the Working Group. This estimate also includes the cost of contracting with a vendor to perform an assessment of BCDC’s workforce as well as resources for additional office space (as BCDC’s headquarters in San Francisco is at capacity.) BCDC notes that without additional positions and contracting resources, BCDC may need to utilize its existing permitting staff and its regulatory improvements team to implement this bill, thereby increasing permitting timelines and delaying implementation of BCDC’s preexisting efforts to improve permitting processes.
3) The California Department of Fish and Wildlife (CDFW) estimates General Fund costs of approximately $270,000 in fiscal year (FY) 2027-28 and $262,000 in FY 2028-29 and FY 2029-30 for one limited-term senior environmental scientist to organize input from the department’s coastal regions (specifically, regions one, three, four, five, and seven); participate in the Working Group, Advisory Group, and public workshops; and assist with the development and review of the Roadmap. This estimate includes the cost of staff travel.
4) The California Coastal Commission estimates annual General Fund costs of approximately $1.1 million in 2027 and 2028 for five limited-term staff to help develop relevant components of the Roadmap, including recommendations across 10 topic areas, new state agency mitigation processes, proposed legislative reforms, alternatives analyses, evaluation of the efficacy of offshore wind project permitting practices, and more. These staff will participate in the Advisory Group and hold multi-agency workshops to solicit feedback on existing agency processes and draft reform proposals for the Roadmap.
5) CalEPA estimates ongoing annual General Fund costs of approximately $208,000 for one senior environmental scientist to consult with members of the Working Group and collaborate on the drafting of recommendations to be included in the Roadmap.
6) The State Water Resources Control Board estimates ongoing annual costs of approximately $4.5 million (General Fund or Waste Discharge Permit Fund) for 18 positions to support participation by the state board and nine regional boards in the creation and implementation of the Roadmap, including developing subject matter expertise, drafting recommendations, participating in statewide public workshops, providing legal consultation, and ensuring the necessary internal operational support (including information technology resources) to implement the bill.
The Legislative Analyst’s Office recently warned of General Fund structural deficits of around $35 billion per year in the 2027-28 FY and ongoing.
While it is reasonable to assume state agencies may require some limited-term resources to participate in the Working Group and Advisory Group and to help develop the required Roadmap, any costs anticipated or incurred by agencies following the development of the Roadmap (in 2028 and onwards) – including many of the significant resource needs outlined above – should not be attributed to this bill. While the bill may create cost pressures on agencies to implement permit streamlining recommendations, implementation of identified reforms is beyond the scope of this bill. Further, with many of the active and ongoing efforts underway at state agencies to streamline and expedite permitting for restoration and resilience projects (see below), it is reasonable to assume agencies may be able to incorporate a portion of the work created by this bill into their existing regulatory improvement efforts, to the extent there is overlap.
COMMENTS:
1) Purpose. According to the author:
The communities most at risk from climate change are disproportionately low-income and communities of color, located in low-lying areas adjacent to San Francisco Bay and the Pacific coast, with limited resources to self-finance adaptation. Every year of permitting delay is a year these communities remain exposed to harm they did not cause and cannot afford to absorb. AB 2051 would outline a process that could help accelerate the delivery of flood protection, wetland restoration, and shoreline adaptation infrastructure to the people who need it most…The bill’s Coastal Resilience Permit Advisory Group is specifically charged with ensuring that streamlining efforts do not weaken protections for fish and wildlife habitat, tribal cultural resources, or public access.
2) Background. Coastal Resilience. California’s coast is increasingly experiencing and vulnerable to the effects of a changing climate, with higher sea levels, stronger storms, and recurrent flooding placing growing pressure on communities, natural habitats, and key infrastructure. Strengthening coastal resilience is critical to managing these risks, helping to protect people and property while sustaining the environmental health and economic vitality of these regions. However, coastal resilience projects often face barriers related to permitting, resulting in fewer projects, higher costs, and lost opportunities.
The author notes that a project sponsor may need to secure up to 10 separate permits from state, federal, and local agencies – and the process is often challenged by redundant and inconsistent application requirements, poorly aligned review timelines, sequential rather than concurrent permit processing, no single lead agency to coordinate or resolve conflicts, and chronic staffing vacancies in agencies that require highly specialized expertise.
Permit Streamlining. There are several local and state efforts underway, as well as numerous legislative efforts over the years, to streamline and expedite permitting for restoration and resilience projects. For example, the Permit Streamlining Act requires a public agency that is the lead agency for a development project to approve or disapprove the project within specified time periods.
Launched in 2021, CNRA’s Cutting the Green Tape program creates new pathways to accelerate, scale, and improve the quality of beneficial habitat restoration projects. According to a March 2026 press release from the Newsom administration, over the past four years, the program has helped more than 500 restoration projects move forward by reducing costly delays and making the approval process easier to navigate. Tools like the Statutory Exemption for Restoration Projects, the State Water Resources Control Board’s Statewide Restoration General Order, the Coastal Commission’s Public Works Plans, Restoration Consistency Determinations, and the newly authorized Restoration Management Permit have collectively saved restoration projects more than $12 million to date.
In March 2026, the secretaries of CNRA and CalEPA issued a joint memo calling on agencies to redouble their efforts to identify and eliminate unnecessary permitting delays. Among other actions, the memo directs agencies to continue simplifying funding pathways; find new ways to improve regulatory processes; uphold early, often, and meaningful tribal consultation; assess opportunities to create dedicated restoration teams; utilize Cutting the Green Tape improvements in mitigation projects; and improve coordination with other entities that have overlapping regulatory oversight or program delivery.
Similarly, BCDC is proposing amendments to its regulations as part of an ongoing effort to modernize its permitting program. The Bay Restoration Regulatory Integration Team is comprised of staff from each of the six state and federal regulatory agencies with jurisdiction over the San Francisco Bay. This team provides project proponents with a “one-stop-shop” for complex multi-benefit habitat restoration and associated flood management projects.
According to the sponsors of this bill – Bay Area Council (BAC) and Bay Planning Coalition (BPC) – this bill creates a more consistent, cross-agency approach to coordination and streamlining for a broader set of climate adaptation and resilience projects and builds on existing permit streamlining efforts by addressing clear gaps in their scope rather than duplicating work.
Analysis Prepared by: Nikita Koraddi / APPR. / (916) 319-2081
Date of Hearing: April 14, 2026
ASSEMBLY COMMITTEE ON WATER, PARKS, AND WILDLIFE
Diane Papan, Chair
ABPCA Bill Id:AB 2051 (
Author:Wicks) – As Amended Ver:March 25, 2026
SUBJECT: Public resources: Coastal Resilience Permitting Working Group
SUMMARY: Requires the Secretary of the Natural Resources Agency (CNRA) to convene a working group and develop a roadmap with recommendations for improving coastal resilience permitting. Specifically, this bill:
- Requires the Secretary of CNRA to develop a Coastal Resilience Permitting Roadmap (Roadmap) with recommendations for process improvements and legislative reforms to enable efficient and timely delivery of environmental approvals by January 1, 2028.
- Requires the Secretary of CNRA, in consultation with the Secretary of the Environmental Protection Agency (CalEPA), to convene a Coastal Resilience Permitting Working Group (Working Group) for the purpose of developing the Roadmap.
- Requires that the Working Group consist of representatives from federal, state, and local agencies, including but not limited to:
- California Coastal Commission (Coastal Commission);
- CalEPA;
- San Francisco Bay, North Coast, and Central Coast Regional Water Quality Control Boards (Regional Water Boards);
- Department of Fish and Wildlife (CDFW);
- Governor’s Office of Land Use and Climate Innovation;
- CNRA;
- Ocean Protection Council;
- San Francisco Bay Conservation and Development Commission (BCDC);
- State Coastal Conservancy;
- State Lands Commission;
- State Office of Historic Preservation; and
- State Water Resources Control Board (State Water Board).
- Requires that the Roadmap include, at minimum, recommendations that address:
- Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including:
- Streamlining the process for determining that applications are complete, including limits on additional information requests when applicants submit complete applications consistent with permit guidelines and timelines for initial and successive reviews;
- Unified applications with a predictable sequence and timeline;
- Statewide or regional interagency project management teams for multiagency permitting, modeled on the Bay Restoration Regulatory Integration Team (BRRIT);
- Methods to standardize compensatory mitigation across agencies, including the consideration of engineering with nature features to enable projects to self-mitigate and a potential de minimis fill policy that allows de minimis fill within defined thresholds without the need to mitigate;
- Delegating permit issuance to executive officers or using consent calendars when appropriate and applicable;
- Expanded use of regional general permits and programmatic agreements for known categories of coastal resilience projects;
- Process improvements that allow for permit approval when the design is complete or during the preapplication process, and for subsequent design changes arising from field conditions and in-depth engineering analysis;
- Standard measures that can be applied to pile driving and fill placement techniques, and other practices that are known to safeguard marine resources, including the types of conditions under which these measures should be utilized and can be scaled to varying project scope and footprint, taking into consideration variability across the ocean floor topographies;
- Recommendations for how to expedite and streamline the permitting of projects included in local sea level rise adaptation plans, as an incentive to complete and implement local plans; and
- Consideration of project-based permit streamlining.
- A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, thereby avoiding temporal loss of habitat and associated increased mitigation requirements, and reducing the need for individual applicants to develop and implement project-specific compensatory mitigation;
- Legislative reforms that have the greatest potential to further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements that result in extensive analysis that could be avoided by application of standardized compensatory mitigation, advance mitigation, or standard construction practices, as well as identification of regulatory gaps and frictions that could lead to maladaptation over time;
- A coastal resilience project pilot program and any required legislative authorizations, if needed to test alternative approaches;
- An evaluation of whether consolidated coastal resilience permits, similar to those provided for offshore wind, would facilitate timely permits; and
- Workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, including a specific analysis of recommended pay scales needed to recruit and retain permitting staff that reflects the educational requirements for these positions, the cost of living in areas where these staff live and work, and private sector compensation for similar skills.
- Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including:
- Requires that, on or before April 1, 2027, the Secretary of CNRA, in collaboration with the Coastal Commission, BCDC, CDFW, and the Regional Water Boards, convene a Advisory Group, consisting of representatives from at least the following:
- Department of Transportation (Caltrans), State Coastal Conservancy, and other relevant state agencies that seek permits for projects in coastal areas;
- Local governments required to update their local coastal plans for sea level rise;
- California ports;
- Local transportation agencies and wastewater treatment agencies;
- California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission; and
- Other members of the public, including businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, and environmental justice organizations.
- Requires the Secretary of CNRA, in consultation with the Coastal Commission, BCDC, CDFW, and the Regional Water Boards to conduct a series of public workshops with the Coastal Resilience Permit Advisory Group or subgroups thereof to:
- Solicit feedback regarding challenges with existing permitting processes, and recommendations and concerns from permittees and other interested parties regarding streamlining proposals; and
- Review and seek comment on draft reform proposals from the Working Group’s Roadmap.
- Defines “coastal resilience project” as a project that maintains, protects, restores, or enables coastal ecosystems, infrastructure, or communities to withstand and adapt to sea level rise and other natural hazards amplified by climate change.
- Makes findings and declarations related to sea level rise and challenges associated with coastal permitting.
EXISTING LAW:
- Defines the coastal zone as the land and water area of the State of California from the Oregon border to the Mexico border, extending seaward to the state’s outer limit of jurisdiction, including all offshore islands, and extending inland generally 1,000 yards from the mean high tide line of the sea, as shown on the maps in Section 17 of Chapter 1330 of the Statutes of 1976 [Public Resources Code (PRC) § 30103].
- Establishes the Coastal Commission and charges it with planning and management of the coastal zone (PRC § 30300 et seq.).
- Establishes BCDC and defines its jurisdiction as San Francisco Bay, including saltponds, managed wetlands, and certain waterways, and a shoreline band 100 feet in width (Government Code § 66610 and § 66620).
- Enacts the Permit Streamlining Act, which sets timelines that public agencies must comply with in issuing permits (Government Code § 65920 et seq.).
FISCAL EFFECT: Unknown. This bill is keyed fiscal.
COMMENTS:
- Purpose of this bill. According to the author, “California’s coast and bays are on the front lines of climate change. Sea level rise, intensifying storm surges, and coastal flooding threaten vulnerable communities, sensitive ecosystems, and critical infrastructure across the state. Californians have responded with ambition—Senate Bill 272 requires local jurisdictions to prepare sea level rise adaptation plans, and voters approved Proposition 4 in 2024, dedicating billions of dollars to coastal resilience investments. The political will and the funding are in place. What remains is the capacity to deliver projects on the ground—and that is where our current permitting system falls short. Today, a project sponsor may need to secure up to ten separate permits from state, federal, and local agencies. The process is plagued by redundant and inconsistent application requirements, no aligned review timelines, sequential rather than concurrent permit processing, no single lead agency to coordinate or resolve conflicts, and chronic staffing vacancies in agencies that require highly specialized expertise. [This bill] takes a targeted, expert-driven approach: directing the Secretary of [CNRA] to convene a Coastal Resilience Permitting Working Group to develop a Coastal Resilience Permitting Roadmap—identifying actionable administrative, regulatory, and legislative reforms. Critically, the bill does not alter existing permitting requirements or weaken any environmental protection. California has made the commitments and investments. [This bill] is the practical, durable step toward building the institutional capacity to deliver on them.”
- Background. In 2024, the Ocean Protection Council released sea level rise guidance suggesting that sea levels in California will most likely rise 0.8 feet above 2000 levels by 2050 and 1.6–3.1 feet by 2100. Local impacts may vary, with some locations, like Humboldt Bay, likely to see higher sea level rise. With the rise in sea level, more frequent coastal flooding and storm surge will occur, threatening communities and infrastructure along the coast. Voters and the Legislature have acted to encourage coastal resilience, but projects face a gauntlet of federal, state, and local permits and permissions designed to protect California’s biodiversity, natural resources, and communities. Navigating the permitting process can be time-consuming and costly for applicants, even for restoration or resilience projects.
Permitting requirements for coastal projects. Many agencies are potentially involved in issuing a permit for coastal development, with the National Oceanic and Atmospheric Administration (NOAA)’s North-Central California Coastal Sediment Coordination Committee identifying at least 16 permitting agencies in its Efficient Permitting Roadmap. Major agencies include:
- The U.S. Army Corps of Engineers (USACE), which issues permits for activities in navigable waters under Section 404 of the federal Clean Water Act and Section 10 of the federal Rivers and Harbors Act;
- The local Regional Water Board, which issues water quality certifications authorizing federal permitting under Section 401 of the Clean Water Act;
- The Coastal Commission, which issues coastal development permits under the California Coastal Act (this authority may be delegated to a local government); and
- CDFW, which issues incidental take permits for species protected under the California Endangered Species Act and lake or streambed alteration agreements.
Additional approvals may be required by other agencies [e.g., BCDC, U.S. Fish and Wildlife Service (USFWS), State Lands Commission, etc.] and environmental review under the California Environmental Quality Act (CEQA) and/or National Environmental Policy Act may be required. Many of these permits and approvals rely on other permits and must be completed in sequence.
Permit streamlining. Due to struggles with the lengthy and complex permitting process, there has been interest in streamlining the permitting process to provide more certainty and efficiency for project proponents. In 2024, the Assembly investigated permitting in California through its Select Committee on Permitting Reform. In its final report, the Select Committee identified several best practices, including frontloading planning, providing a clear and straightforward process, maximizing consistency across permitting agencies, and pre-determining mitigation measures.
In some parts of the state, these best practices have been deployed for coastal permitting, including in the Bay Area, where the San Francisco Bay Restoration Authority, with support from the U.S. Environmental Protection Agency, convenes dedicated staff from six permitting agencies (USACE, USFWS, NOAA National Marine Fisheries Service, San Francisco Bay Regional Water Board, CDFW, and BCDC) to improve the permitting process for multi-benefit habitat restoration projects and associated flood management and public access infrastructure. The resulting coordinating group, BRRIT, uses pre-application consultation to accelerate the permitting process. Of the 11 fully-permitted projects identified in the BRRIT 2025 Annual Report, 100% had all permits issued within the target timeline. Where some partially-permitted projects have not met the target timeline, this has been due to late changes to conditions (for example, changes to listed species under the federal Endangered Species Act).
Other permit streamlining efforts have also been launched statewide, including under CNRA’s “Cutting the Green Tape” initiative. In a February 2026 memorandum, the Secretaries of CNRA and CalEPA highlighted several key streamlining efforts:
- The Statutory Exemption for Restoration Projects (SERP), which has allowed CDFW to streamline CEQA compliance for 83 habitat restoration or enhancement projects;
- The Restoration Management Permit, which consolidates five permits into one and has allowed CDFW to reduce average processing time for applications to less than three months;
- The Statewide General Restoration Order issued by the State Water Board for large restoration projects, which has saved applicants, on average, $25,730 and reduced processing time by 5.5 months;
- Public Works Plans created by the Coastal Commission, which now cover over 350,000 acres of completed wildfire resilience and forest restoration projects.
There remains an opportunity to coordinate across permitting entities, as these streamlining efforts and the timelines required for permit issuance under the Permit Streamlining Act generally impact a single permit, rather than the total compliance timeline, which may involve the sequential issuance of numerous permits.
Mitigation, advance mitigation, and self-mitigation. Mitigation is mandated by CEQA guidelines whenever a project may result in significant impact to the environment (see, 14 California Code of Regulations §§ 15021 and 15091). These requirements exist to ensure that California’s natural resources are preserved and protected into the future, for the benefit of all. When habitat (such as a wetland) is damaged by a project, the required mitigation for that damage frequently includes the restoration, enhancement, and/or preservation of comparable habitat. In “advance mitigation,” efficiencies can be obtained by compensating for impacts before they occur. This allows for landscape-level planning, more efficient permitting, and no temporal loss of habitat. Programs for advance mitigation through CDFW include conservation and mitigation banking and mitigation credit agreements; Caltrans also has a program for regional-scale advance mitigation. Some project proponents seek to “self-mitigate” to avoid the requirement for off-site compensatory mitigation entirely. This can be accomplished (currently on a case-by-case basis) by implementing habitat features and engineering with nature-based solutions into project design and construction. This bill lays out increasing opportunities for advance mitigation and self-mitigation as topics for the Working Group to consider.
- Arguments in support. The Exploratorium writes, “California’s coast and bays are on the front lines of climate change. Sea level rise, storm surges, and increasingly frequent flooding threaten vulnerable communities, sensitive ecosystems, and critical infrastructure across the state.” The Bay Area Council and Bay Planning Coalition add, “Despite urgent need and significant demand for public and private investment for climate adaptation, coastal resilience projects in California routinely face protracted and unpredictable permitting timelines. Overlapping state and federal authorities, inconsistent mitigation requirements, and inadequate interagency coordination create barriers that delay the very projects our communities need most. [This bill] takes a practical, expert-driven approach to solving this problem by convening the agencies, technical practitioners, and stakeholders best positioned to identify the specific reforms needed.”
- Dual referral. This bill was also referred to the Assembly Natural Resources Committee, where it passed by a vote of 12-1 on March 23, 2026.
- Related legislation. AB 1581 (Kalra), Chapter 681, Statutes of 2024, creates the consolidated Restoration Management Permit, to streamline restoration projects.
SB 174 (Budget and Fiscal Review), Chapter 74, Statutes of 2024, a public resources trailer bill, among other provisions, extends SERP to January 1, 2030.
SB 272 (Laird), Chapter 384, Statutes of 2023, requires the Coastal Commission and BCDC to develop guidelines for sea level rise plans, and requires local governments lying in the coastal zone or in BCDC’s jurisdiction to adopt sea level rise plans by January 1, 2034.
SB 155 (Budget and Fiscal Review), Chapter 258, Statutes of 2021, a public resources trailer bill, among other provisions, creates SERP to exempt certain conservation and restoration projects from CEQA.
REGISTERED SUPPORT / OPPOSITION:
Support
Bay Area Council (co-sponsor)
Bay Planning Coalition (co-sponsor)
California State Association of Counties
City of Port Hueneme
Coastal Quest
East Bay Dischargers Authority
Econcrete
McFadden Finch Holdings Company
Orange County Transportation Authority
Port of Redwood City
San Francisco Bay Ferry
San Francisco International Airport
San Mateo County Flood and Sea Level Rise Resiliency District
Santa Clara Valley Water District
The Exploratorium
The Nature Conservancy
Wildcoast
Opposition
None on file
Analysis Prepared by: Sean Clair / W., P., & W. / (916) 319-2096
Date of Hearing: March 23, 2026
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Isaac G. Bryan, Chair
ABPCA Bill Id:AB 2051 (
Author:Wicks) – As Introduced Ver:February 18, 2026
SUBJECT: Public resources: Coastal Resilience Permitting Working Group
SUMMARY: Requires the Secretary of the Natural Resources Agency (NRA), in consultation with the Secretary for Environmental Protection (CalEPA), to convene a Coastal Resilience Permitting Working Group (Working Group) for the purpose of developing a Coastal Resilience Permitting Roadmap (Roadmap) for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and in and adjacent to state and federal waters.
EXISTING LAW:
- Establishes the California Coastal Act of 1976 (Coastal Act), establishes the California Coastal Commission (Coastal Commission), and prescribes the membership and duties of the Coastal Commission. (Public Resources Code (PRC) 30301)
- Establishes the San Francisco Bay Conservation and Development Commission (BCDC) to regulate the San Francisco Bay and the first 100 feet inland from the shoreline around the Bay. (Government Code (GC) 66620)
- Pursuant to the Permit Streamlining Act (GC 65920-65923.8), which applies to all public agencies:
- States that there is a statewide need to ensure clear understanding of the specific requirements which must be met in connection with the approval of development projects and to expedite decisions on such projects.
- Provides specified timeframes by which a public agency that is the lead agency for a development project is required to approve or disapprove a project.
- Requires any public agency to determine in writing whether an application is complete within 30 days of receiving the application for a development project. Establishes iterative processes and timelines for reviewing complete applications.
- Requires, upon final approval of a housing development project, a city, county, or city and county to provide the development proponent with an itemized list and a good faith estimate of the total sum amount of all fees and exactions that will apply to the project within 30 business days.
THIS BILL:
- Requires the Secretary of NRA, in consultation with the Secretary for CalEPA, to convene a Working Group for the purpose of developing a Roadmap for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and in and adjacent to state and federal waters.
- Requires the Working Group to consist of representatives from federal, state, and local agencies, including, but not limited to, representatives from all of the following entities:
- The Coastal Commission;
- CalEPA;
- The California Regional Water Quality Control Boards, San Francisco Bay, North Coast, and Central Coast (regional water boards);
- The Department of Fish and Wildlife (CDFW);
- The Governor’s Office of Land Use and Climate Innovation;
- NRA;
- The Ocean Protection Council (OPC);
- BCDC;
- The State Coastal Conservancy (SCC);
- The State Historical Resources Commission;
- The State Lands Commission;
- The State Office of Historic Preservation; and,
- The State Water Resources Control Board (SWRCB).
- Requires development of the Roadmap to incorporate, but not delay, progress to advance responsible permitting and development of coastal resilience projects.
- Requires, on or before January 1, 2028, the Secretary of NRA to submit the Roadmap to the Governor and the relevant fiscal and policy committees of the Legislature. Sunsets this requirement on January 1, 2032.
- Requires the Roadmap to include, at a minimum, recommendations that address all of the following:
- Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including all of the following:
- Streamlining the process for determinations that applications are complete, including limits on additional information requests and timelines for initial and successive reviews;
- Unified applications with a predictable sequence and timeline of permitting information requests and interagency reviews;
- An interagency project management team for multiagency permitting, modeled on the Bay Restoration Regulatory Integration Team;
- Methods to standardize compensatory mitigation across agencies, including use of engineering with nature features to enable projects to self-mitigate and a de minimis fill policy that allows de minimis fill within defined thresholds without the need to mitigate;
- Delegating permit issuance to executive officers or using consent calendars when commission or board action is required by law;
- Expanded use of regional general permits and programmatic agreements for known categories of coastal resilience projects;
- Process improvements that allow for permit approval earlier in the design process, and for subsequent design changes arising from field conditions and in-depth engineering analysis; and,
- Standard measures that can be applied to pile driving and fill placement techniques, and other practices that are known to safeguard marine resources, including the types of conditions under which these measures should be utilized and can be scaled to varying project scope and footprint.
- A state process to align agency mitigation requirements and enable in-lieu fees or advance mitigation through which applicants can contribute funding to eligible restoration or mitigation initiatives, thereby avoiding temporal loss of habitat and associated increased mitigation requirements, and reducing the need for individual applicants to develop and implement project-specific compensatory mitigation projects.
- Legislative reforms that can further accelerate permitting for projects that increase coastal resilience, with a focus on current legislative requirements that result in extensive analysis that could be avoided by application of standardized compensatory mitigation, advance mitigation, or standard construction practices.
- If needed to test alternative approaches, a coastal resilience project pilot program along with any required legislative authorizations to evaluate the effectiveness of recommended reforms and environmental protection.
- An evaluation of whether consolidated coastal resilience permits similar to those provided for offshore wind projects would facilitate timely permits.
- A workforce assessment and funding options for regulatory staffing positions and as-needed permitting support contracts to supplement staff, including a specific analysis of recommended pay scales needed to recruit and retain permitting staff that reflect the educational requirements for these positions, the cost of living in areas where these staff live and work, and private sector compensation for similar skills.
- Administrative reforms that can be implemented by state agencies within their existing authority to improve permit issuance timelines, including all of the following:
- Requires, on or before April 1, 2027, the Coastal Commission and BCDC, in collaboration with CDFW, and the regional water boards with jurisdiction over the California coast and San Francisco Bay, to convene a Coastal Resilience Permit Advisory Group (Advisory Group). Requires the Advisory Group membership to include, but not be limited to, representatives of each of the following:
- The Department of Transportation, SCC, and other relevant state agencies that seek permits for projects in coastal areas;
- Local governments required to update their local coastal plans for sea level rise;
- California ports;
- Local transportation agencies and wastewater treatment agencies;
- California Native American tribes that are on the contact list administered and maintained by the Native American Heritage Commission; and,
- Other members of the public, including businesses, home and affordable housing builders, commercial and recreational fishers, environmental organizations, environmental justice organizations, and others.
- Requires the Coastal Commission and BCDC, in consultation with the CDFW, and the regional water boards, to conduct a series of public workshops with the Advisory Group to do all of the following:
- Solicit feedback regarding challenges with existing permitting processes, and recommendations and concerns from permittees and other interested parties regarding streamlining proposals; and,
- Review and seek comment on draft reform proposals from the Working Group’s Roadmap.
FISCAL EFFECT: Unknown
COMMENTS:
- Permit reform. Permits and approvals are required and administered under various statutes and regulations at the federal, state, regional, and local levels. The value of an approved permit is assurance a project is in compliance with all applicable laws. The specific types of permits and approvals that are required for a project will depend on the scale and nature of the proposed project, location in a special area (i.e., the coastal zone, on public land), ecological conditions (when protected biological resources are or are anticipated to be, in or adjacent to the project area), or project size.
The bill’s findings state that the combination of overlapping, and sometimes duplicative, federal and state authorities, requirements for project-specific studies, limited regulatory agency staffing, interagency coordination needs, and inconsistency and uncertainty regarding mitigation requirements results in extended permitting timelines for all projects in or adjacent to federal waters, including coastal resilience projects.
Improved communication, coordination, and collaboration can reduce unnecessary duplication of effort, streamline information needs, and decrease the time and cost for permit approvals.
- Permit Streamlining Act. The Legislature enacted the Permit Streamlining Act in 1977 to expedite permit processing across all public agencies. Under the Act, once an agency receives an initial application, it has 30 days to notify the applicant of any additional materials needed to complete the application. There is no timeline for when the applicant must respond or provide the requested information, but when the public agency does, it has another 30 days to review it to determine whether it is complete. If not, the 30-day cycle starts again. Once the application is complete, the agency is required to take final action within 180 days. That time limit may be extended one time for up to 90 days upon the mutual consent of the agency and the applicant. If an agency fails to approve or disapprove the permit within the time limits specified, the permit is subject to being deemed approved.
The PSA has resulted in truncated permit timelines, but doesn’t address a project’s cumulative timing for obtaining numerous permits from different public entities.
- Cutting the Green Tape. In 2019, NRA launched the Cutting Green Tape initiative to accelerate ecological restoration, conservation, and stewardship by advancing permitting and funding efficiencies across agencies, regulations, policies, and practices. The initiative has led to programmatic permits to authorize a set of related projects or multiple projects that are substantially similar. This approach significantly reduces time and resources that would otherwise be devoted to issuing individual permits at the project level. These authorizations require substantial up-front investment, but once established, have been shown to reduce permitting times by up to 50%. Programmatic permits are currently offered across different agencies for environmental restoration projects.
Examples include the SWRCB’s Large Habitat Restoration General Order, a programmatic permit for common habitat restoration activities exceeding five acres in size to streamline larger projects for improvements to stream crossing and fish passage, floodplain restoration, and removal of non-native invasive species. CDFW developed a new process for issuing consistency determinations that involves CDFW’s “pre-approval” of biological opinions to ensure general consistency with the California Endangered Species Act coupled with an expedited review of project-specific applications. CDFW also developed the Restoration Management Permit (RMP) after meeting with restoration stakeholders to identify the specific constraints they face when implementing restoration projects where protected species are present. The RMP consolidates authorizations that voluntary habitat restoration projects may need into a single streamlined permit, truncating permit processing from up to five state departments and up to two years to four to five months. Also, the Coastal Commission uses Public Works Plans (PWPs) to streamline fuel reduction projects in the coastal zone. PWPs authorize projects with streamlined review and without the need for additional coastal permits over 10 years.
- Other permit reform. BCDC is proposing amendments to its regulations as part of an ongoing effort to modernize its permitting program. In 2024, staff completed a year-long assessment of the permitting process and developed a roadmap identifying targeted improvements for the permitting program. BCDC’s existing regulations allow BCDC to authorize similar categories of activities under two different permit programs, one for regionwide permits and another for abbreviated regionwide permits. The proposed amendments will repeal the existing regulations governing regionwide permits and abbreviated regionwide permits in their entirety and adopt a new set of amended regulations for the regionwide permit program only. BCDC notes that its proposed amendments are consistent with statewide efforts to improve permitting processes.
The Bay Restoration Regulatory Integration Team (BRRIT) is comprised of staff from each of the six state and federal regulatory agencies with jurisdiction over San Francisco Bay. This team provides project proponents with a “one-stop shop” for complex multi-benefit habitat restoration and associated flood management projects, increasing efficiencies by 1) establishing a collaborative pre-application process in which agencies and project proponents identify and resolve issues early in project planning, and 2) diminishing the time involved for serial review, one agency at a time, for needed multi-agency permitting.
- Select Committee on Permit Reform. In 2024, the Select Committee met to discuss permit challenges and permit process reform for infill housing, clean energy, transit, and climate resiliency projects. The resultant California Assembly Select Committee on Permitting Reform Final Report[1] (March 2025) notes that despite permit reforms already undertaken, many stakeholders expressed concern that further permitting reform is necessary for the state to achieve its housing production goals, such as eliminating uncertainty in the application process; minimizing uncertainty in the entitlement process; creating more consistency across permitting entities; focusing CEQA on environmental issues; and, minimizing uncertainty for post-entitlement permits.
The report identified best practices for permitting reform, including prioritizing agency objectives and workload, providing a clear and straightforward permit application process, and establishing specific timeframes for reviewing permits.
NRA participated in the Select Committee’s hearings, and the SWRCB, Bay Area Air Quality Management District, CDFW, and other public agencies contributed to the research and preparation of the report, all of which can facilitate incorporation of preexisting feedback into the Working Group’s Roadmap.
- This bill. AB 2051 requires NRA to convene a Working Group to develop a Roadmap for coastal resilience projects proposed along the California coast and in the San Francisco Bay, and make recommendations on myriad administrative reforms and alignment of agency requirements to streamline permitting processes and timeframes.
Numerous recent reports completed by agencies participating in the Working Group and/or Advisory Group have been published with recommendations to streamline the permitting process for coastal development projects. These reports can both inform the Roadmap and eliminate unnecessary redundancies in the Working Group’s efforts.
For instance, this bill acknowledges some of those reports, including the National Oceanic and Atmospheric Administration’s North-Central California Coastal Sediment Coordination Committee’s 2024 Efficient Permitting Roadmap that synthesizes guidance, tips, and best practices from 20 federal, state, and local agencies to create a ‘how to’ guide and clearinghouse of information for navigating efficient permitting and environmental review process for coastal habitat restoration projects. The 2023 Cutting Green Tape Along the Coast and San Francisco Bay report recommended an interagency permitting team in Southern California to be established as a subteam of the existing Southern California Wetlands Recovery Project, which is comprised of essentially the same agencies as the BRRIT. This bill gleans from that by requiring consideration of an interagency project management team for multiagency permitting, modeled on BRRIT.
- Staff resources. The bill acknowledges that workforce capacity is a contributing factor to permit review and turnaround times and requires the Working Group to include a workforce assessment and funding options for regulatory staffing positions. It is worth noting that the agencies being required to participate in the Working Group may not have surplus staff time to commit to developing the Roadmap, which could lead to reduced staff needed to process current permit applications. To reconcile that, the author may wish to consider working with the public agencies to address participating in the Working Group without jeopardizing permit review. Alternatively, adjusting the timeframes in the bill to allow more time for the Working Group to meet and report to the Legislature could address potential workload and personnel issues.
- Statewide application. The Working Group’s Roadmap would apply to statewide permitting reform, but the 1,100 mile coast line is incredibly topographically, meteorologically, and economically variable, and permit reform under the auspices of any one-size-fits-all is unlikely. The Bay Area region, for instance, is roughly 30% of the state’s coastline, but bay-shoreline is quite different from Pacific Ocean shoreline. The author may wish to consider either teasing apart Bay Area coastal resilience permit reform from the rest of the state, or narrowing the bill with a regional focus.
- Defining climate resiliency. Coastal resilience refers to the ability of coastal ecosystems and communities to adapt, recover, and withstand disturbances such as storms, sea level rise, and other climate related impacts. It involved both natural solutions, like restoring wetlands, and engineered solutions, such as hard armoring with seawalls. The concept emphasizes the importance of adaptive strategies to enhance both natural and built environments, ultimately reducing vulnerabilities to future threats and ensuring long-terms sustainability. Establishing a definition for ‘coastal resilience’ projects would provide clarity for the Working Group about how to discuss permit reform in the roadmap. Further, directing the Working Group to consider permit reforms for project-types may help focus relevant permit improvements depending on whether the project is nature-based, infrastructure-based, or a combination of the two.
- Author’s statement:
AB 2051 takes a targeted, expert-driven approach. Rather than legislating specific process changes from Sacramento, the bill directs the Secretary of the Natural Resources Agency to convene a Coastal Resilience Permitting Working Group — drawing on the California Coastal Commission, the Bay Conservation and Development Commission, Regional Water Boards, the Department of Fish and Wildlife, and other state, federal, and local partners — to develop a Coastal Resilience Permitting Roadmap. The Roadmap will identify actionable reforms: administrative changes to improve permit timelines, a state process to align agency mitigation requirements, legislative recommendations to accelerate permitting, and a workforce assessment to address staffing gaps.
The communities most at risk from climate change are disproportionately low-income and communities of color, located in low-lying areas adjacent to San Francisco Bay and the Pacific coast, with limited resources to self-finance adaptation. Every year of permitting delay is a year these communities remain exposed to harm they did not cause and cannot afford to absorb. AB 2051 would outline a process that could help accelerate the delivery of flood protection, wetland restoration, and shoreline adaptation infrastructure to the people who need it most.
Vitally, AB 2051 does not alter existing permitting requirements or weaken any environmental protection. The bill’s Coastal Resilience Permit Advisory Group is specifically charged with ensuring that streamlining efforts do not weaken protections for fish and wildlife habitat, tribal cultural resources, or public access. California has made commitments and investments. What we need now is the institutional capacity to deliver. AB 2051 is a practical, durable, and overdue step toward making that possible.
- Double referral. This bill is also referred to the Assembly Water, Parks and Wildlife Committee.
- Committee amendments. The committee may wish to consider the following amendments to clarify that administrative reforms should be recommended to the extent feasible, provide a definition for “coastal resilience project,” require CNRA as a single facilitator for the advisory groups, and other clarifying changes.
REGISTERED SUPPORT / OPPOSITION:
Support
Bay Area Council
Bay Planning Coalition
California State Association of Counties
Exploratorium, the
Kiewit Infrastructure West Co.
McFadden Finch Holdings Company
Port of San Francisco
San Francisco International Airport
Wareham Development
Opposition
None on file
Analysis Prepared by: Paige Brokaw / NAT. RES. /
Discussed in Hearing
Assembly Floor
Senate Floor
Senate Standing Committee on Natural Resources and Water
Senate Standing Committee on Appropriations
Senate Standing Committee on Natural Resources and Water
Assembly Floor
Assembly Standing Committee on Water, Parks, and Wildlife
Assembly Standing Committee on Natural Resources
Bill Author
Bill Co-Author(s):