AB 2168: Active Transportation Program: guidelines.
- Session Year: 2025-2026
- House: Assembly
- Latest Version Date: 2026-09-14
Current Status:
Passed
(2026-09-15: Chaptered by Secretary of State - Chapter 210, Statutes of 2026.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law establishes the Active Transportation Program in the Department of Transportation for the purpose of encouraging increased use of active modes of transportation, such as biking and walking. Existing law requires the California Transportation Commission to develop guidelines and project selection criteria for the program, including guidelines with regard to project eligibility that include, among other project types, safe routes to transit projects that will encourage transit by improving biking and walking routes to mass transportation facilities and schoolbus stops.
This bill would, on and after January 1, 2028, instead require the guidelines with regard to project eligibility to include projects for safe routes to transit projects that encourage access to transit facilities and schoolbus stops by biking and walking, as specified, and projects that will expand access to transit in underserved or rural areas.
Existing law authorizes the guidelines to include incentives to maximize the potential for attracting funds other than program funds for eligible projects.
This bill would, on and after January 1, 2028, (1) instead require the guidelines to include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects in order to scale funding for larger or network-level active transportation improvements, (2) require the guidelines to include a progressive range of penalties for an applicant that failed to use previously received program funds in a timely manner, as specified, and (3) require the guidelines to include a requirement for an applicant to consult with the executive officer of a transit agency operating in a project corridor if the project will be adjacent to an existing bus, shuttle, or paratransit route, as specified.
Existing law establishes the Active Transportation Program in the Department of Transportation for the purpose of encouraging increased use of active modes of transportation, such as biking and walking. Existing law requires the California Transportation Commission to develop guidelines and project selection criteria for the program, including guidelines with regard to project eligibility that include, among other project types, safe routes to transit projects that will encourage transit by improving biking and walking routes to mass transportation facilities and schoolbus stops.
This bill would, on and after January 1, 2028, instead require the guidelines with regard to project eligibility to include projects for safe routes to transit projects that encourage access to transit facilities and schoolbus stops by biking and walking, as specified, and projects that will expand access to transit in underserved or rural areas.
Existing law authorizes the guidelines to include incentives to maximize the potential for attracting funds other than program funds for eligible projects.
This bill would, on and after January 1, 2028, (1) instead require the guidelines to include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects in order to scale funding for larger or network-level active transportation improvements, (2) require the guidelines to include a progressive range of penalties for an applicant that failed to use previously received program funds in a timely manner, as specified, and (3) require the guidelines to include a requirement for an applicant to consult with the executive officer of a transit agency operating in a project corridor if the project will be adjacent to an existing bus, shuttle, or paratransit route, as specified.
Existing law establishes the Active Transportation Program in the Department of Transportation for the purpose of encouraging increased use of active modes of transportation, such as biking and walking. Existing law requires the California Transportation Commission to develop guidelines and project selection criteria for the program, including guidelines with regard to project eligibility that include, among other project types, safe routes to transit projects that will encourage transit by improving biking and walking routes to mass transportation facilities and schoolbus stops.
This bill would, on and after January 1, 2028, instead require the guidelines with regard to project eligibility to include projects for safe routes to transit projects that encourage access to transit facilities and schoolbus stops by biking and walking, as specified, and projects that will expand access to transit in underserved or rural areas.
Existing law requires the commission to develop guidelines with regard to project selection that include, among other criteria, identification of walking and bicycling routes to and from schools, transit facilities, and community centers.This bill would, on and after January 1, 2028, require the guidelines with regard to project selection to also include as criteria recommendations to maximize commitments of state transportation improvement program funds to projects funded by the program.Existing law authorizes the guidelines to include incentives to maximize the potential for attracting funds other than program funds for eligible projects.
This bill would, on and after January 1, 2028, (1) instead require the guidelines to include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects in order to scale funding for larger or network-level active transportation improvements, (2) require the commissions guidelines to include a progressive range of penalties for an applicant that failed to use previously received program funds in a timely manner, as specified. specified, and (3) require the guidelines to include a requirement for an applicant to consult with the executive officer of a transit agency operating in a project corridor if the project will be adjacent to an existing bus, shuttle, or paratransit route, as specified.
Existing law establishes the Active Transportation Program in the Department of Transportation for the purpose of encouraging increased use of active modes of transportation, such as biking and walking. Existing law requires the California Transportation Commission to develop guidelines with regard to project eligibility that include, among other project types, safe routes to transit projects that will encourage transit by improving biking and walking routes to mass transportation facilities and schoolbus stops.
This bill would would, on and after January 1, 2028, instead require the guidelines with regard to project eligibility to include projects for safe routes to transit projects that encourage access to transit facilities and schoolbus stops by biking and walking, as specified, and projects that will expand access to transit in underserved or rural areas.
Existing law requires the commission to develop guidelines with regard to project selection that include, among other criteria, identification of walking and bicycling routes to and from schools, transit facilities, and community centers.
This bill would would, on and after January 1, 2028, require the guidelines with regard to project selection to also include as criteria recommendations to maximize commitments of state transportation improvement program funds to projects funded by the program.
This bill would would, on and after January 1, 2028, require the commissions guidelines to include a progressive range of penalties for an applicant that failed to use previously received program funds in a timely manner, as specified.
Existing law establishes the Active Transportation Program in the Department of Transportation for the purpose of encouraging increased use of active modes of transportation, such as biking and walking. Existing law requires the California Transportation Commission to develop guidelines with regard to project eligibility that include, among other project types, safe routes to transit projects that will encourage transit by improving biking and walking routes to mass transportation facilities and schoolbus stops.
This bill would instead require the guidelines with regard to project eligibility to include projects for safe routes to transit projects that encourage access to transit and investments in transit-rich and infill opportunity areas, as specified. facilities and schoolbus stops by biking and walking, as specified, and projects that will expand access to transit in underserved or rural areas.
Existing law requires the commission to develop guidelines with regard to project selection that include, among other criteria, identification of walking and bicycling routes to and from schools, transit facilities, and community centers.
This bill would require the guidelines with regard to project selection to also include as criteria the potential for encouraging increased access to public transit and recommendations to maximize commitments of state transportation improvement program funds to projects funded by the program. The bill would require higher priority to be given to projects that allocate 50% or more of state transportation improvement program programming capacity to active transportation improvements.
This bill would require the commissions guidelines to include a progressive range of penalties for an applicant that failed to use previously received program funds in a timely manner, as specified.Existing law establishes the Active Transportation Program in the Department of Transportation for the purpose of encouraging increased use of active modes of transportation, such as biking and walking. Existing law requires the California Transportation Commission to develop guidelines with regard to project eligibility that include, among other project types, safe routes to transit projects that will encourage transit by improving biking and walking routes to mass transportation facilities and schoolbus stops.
This bill would instead require the guidelines with regard to project eligibility to include projects for safe routes to transit projects that encourage access to transit and investments in transit-rich and infill opportunity areas, as specified.
Existing law requires the commission to develop guidelines with regard to project selection that include, among other criteria, identification of walking and bicycling routes to and from schools, transit facilities, and community centers.
This bill would require the guidelines with regard to project selection to also include as criteria the potential for encouraging increased access to public transit and recommendations to maximize commitments of state transportation improvement program funds to projects funded by the program. The bill would require higher priority to be given to projects that allocate 50% or more of state transportation improvement program programming capacity to active transportation improvements.
This bill would require the commissions guidelines to include a progressive range of penalties for an applicant that failed to use previously received program funds in a timely manner, as specified.
The Pedestrian Mall Law of 1960 authorizes the legislative body of a city to, among other things, establish pedestrian malls and to prohibit, in whole or in part, vehicular traffic on a pedestrian mall.This bill would make nonsubstantive changes to the provision naming the law.The Pedestrian Mall Law of 1960 authorizes the legislative body of a city to, among other things, establish pedestrian malls and to prohibit, in whole or in part, vehicular traffic on a pedestrian mall.
This bill would make nonsubstantive changes to the provision naming the law.
There is hereby established the Active Transportation Program in the department for the purpose of encouraging increased use of active modes of transportation, such as biking and walking. It is the intent of the Legislature that the program achieve all of the following goals:
(a)Increase the proportion of trips accomplished by biking and walking, including, but not limited to, access to public transit stops, stations, and other transit facilities.
(b)Increase safety and mobility for nonmotorized users.
(c)Advance the active transportation efforts of regional agencies to achieve greenhouse gas reduction goals as established pursuant to Senate Bill 375 (Chapter 728, Statutes of 2008) and Senate Bill 391 (Chapter 585, Statutes of 2009).
(d)Enhance public health, including reduction of childhood obesity through the use of programs including, but not limited to, projects eligible for Safe Routes to School Program funding.
(e)Ensure that disadvantaged communities fully share in the benefits of the program.
(f)Provide a broad spectrum of projects to benefit many types of active transportation users.
SEC. 2.Section 2382 of the Streets and Highways Code is amended to read:2382.(a)The California Transportation Commission shall develop guidelines and project selection criteria for the Active Transportation Program in consultation with the Active Transportation Program Workgroup, which shall be formed for purposes of providing guidance on matters including, but not limited to, development of and subsequent revisions to program guidelines, schedules and procedures, project selection criteria, performance measures, and program evaluation. The workgroup shall include, but not be limited to, representatives of government agencies and active transportation stakeholder organizations with expertise in pedestrian and bicycle issues, including Safe Routes to School programs.
(b)The guidelines shall be the complete and full statement of the policies and criteria that the commission intends to use in selecting projects to be included in the program. The guidelines shall address subjects that include, but are not limited to, project eligibility, application timelines, application rating and ranking criteria, project monitoring, reporting, and transparency, and project performance measurement.
(c)The guidelines shall include a process to ensure that no less than 25 percent of overall program funds benefit disadvantaged communities during each program cycle. The guidelines shall establish a program definition for disadvantaged communities that may include, but need not be limited to, the definition in Section 39711 of the Health and Safety Code and the definition of low-income schools in paragraph (7) of subdivision (b) of former Section 2333.5, as that section read on January 1, 2013. A project eligible under this subdivision shall clearly demonstrate a benefit to a disadvantaged community or be directly located in a disadvantaged community.
(d)The guidelines shall allow streamlining of project delivery by authorizing an implementing agency to seek commission approval of a letter of no prejudice that will allow the agency to expend its own funds for a project programmed in a future year of the adopted program of projects, in advance of allocation of funds to the project by the commission, and to be reimbursed at a later time for eligible expenditures.
(e)The California Transportation Commission shall adopt the guidelines and selection criteria for, and define the types of projects eligible to be funded through, the program following at least two public hearings. Projects funded in this program shall be limited to active transportation projects. The guidelines shall ensure that eligible projects meet one or more of the goals set forth in Section 2380 and may give increased weight to projects meeting multiple goals.
(f)In developing the guidelines with regard to project eligibility, the commission shall include, but need not be limited to, the following project types:
(1)Development of new bikeways and walkways, or improvements to existing bikeways and walkways, that improve mobility, access, or safety for nonmotorized users. On and after January 1, 2026, the guidelines with regard to project eligibility shall not include the development of Class III bikeways, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless any of the following apply:
(A)The Class III bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less.
(B)The project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(C)The project applicant demonstrates that the use of the Class III bikeway or marking is appropriate for the local community context and advances a lower stress environment or a low-stress network.
(2)Secure bicycle parking at employment centers, park and ride lots, rail and transit stations, and ferry docks and landings.
(3)Bicycle-carrying facilities on public transit, including rail and ferries.
(4)Installation of traffic control devices to improve the safety of pedestrians and bicyclists.
(5)Elimination of hazardous conditions on existing bikeways and walkways.
(6)Maintenance of bikeways and walkways.
(7)Recreational trails and trailheads, park projects that facilitate trail linkages or connectivity to nonmotorized corridors, and conversion of abandoned railroad corridors to trails.
(8)Safe Routes to School projects that improve the safety of children walking and bicycling to school, in accordance with Section 1404 of Public Law 109-59.
(9)Safe routes to transit projects, which will encourage transit by improving biking and walking routes to mass transportation facilities and schoolbus stops.
(10)Educational programs to increase biking and walking, and other noninfrastructure investments that demonstrate effectiveness in increasing active transportation.
(g)In developing the guidelines with regard to project selection, the commission shall include, but need not be limited to, the following criteria:
(1)Demonstrated needs of the applicant.
(2)Potential for reducing pedestrian and bicyclist injuries and fatalities.
(3)Potential for encouraging increased walking and bicycling, especially among students.
(4)Identification of safety hazards for pedestrians and bicyclists.
(5)Identification of walking and bicycling routes to and from schools, transit facilities, and community centers.
(6)Identification of the local public participation process that culminated in the project proposal, which may include noticed public meetings and consultation with local stakeholders.
(7)Benefit to disadvantaged communities. In developing guidelines relative to this paragraph, the commission shall consider, but need not be limited to, the definition of disadvantaged communities as applied pursuant to subdivision (c).
(8)Cost-effectiveness, defined as maximizing the impact of the funds provided.
(9)The adoption by a city or county applicant of a bicycle transportation plan, pursuant to Section 891.2, a pedestrian plan, a safe routes to school plan, or an overall active transportation plan.
(10)Use of the California Conservation Corps or a qualified community conservation corps, as defined in Section 14507.5 of the Public Resources Code, as partners to undertake or construct applicable projects in accordance with Section 1524 of Public Law 112-141.
(11)Other factors, such as potential for reducing congestion, improving air quality, reducing greenhouse gas emissions, and increasing and improving connectivity and mobility of nonmotorized users. On and after January 1, 2026, increasing or improving connectivity of nonmotorized users shall not include the addition of a bikeway connecting to a Class III bikeway, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless the bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less or the project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(h)For the use of federal Transportation Alternative Program funds, or other federal funds, commission guidelines shall meet all applicable federal requirements.
(i)For the use of federal Highway Safety Improvement Program funds for active transportation projects specific to reducing fatalities and serious injuries, the criteria for the selection of projects shall be based on a data-driven process that is aligned with the states Strategic Highway Safety Plan.
(j)The guidelines may include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects.
(k)In reviewing and selecting projects funded by federal funds in the Recreational Trails Program, the commission shall collaborate with the Department of Parks and Recreation to evaluate proposed projects, and to ensure federal requirements are met.
(l)To ensure that regional agencies charged with allocating funds to projects pursuant to paragraph (1) of subdivision (a) of Section 2381 have sufficient discretion to develop regional guidelines, the commission may adopt separate guidelines for the state and for the regional agencies relative to subdivision (g).
(m)This section shall remain in effect only until January 1, 2028, and as of that date is repealed.
SEC. 3.Section 2382 is added to the Streets and Highways Code, to read:2382.(a)The California Transportation Commission shall develop guidelines and project selection criteria for the Active Transportation Program in consultation with the Active Transportation Program Workgroup, which shall be formed for purposes of providing guidance on matters, including, but not limited to, development of and subsequent revisions to program guidelines, schedules and procedures, project selection criteria, performance measures, and program evaluation. The workgroup shall include, but not be limited to, representatives of governmental agencies and active transportation stakeholder organizations with expertise in pedestrian and bicycle issues, including Safe Routes to School programs.
(b)The guidelines shall be the complete and full statement of the policies and criteria that the commission intends to use in selecting projects to be included in the program. The guidelines shall address subjects that include, but are not limited to, project eligibility, application timelines, application rating and ranking criteria, project monitoring, reporting, and transparency, and project performance measurement.
(c)The guidelines shall include a process to ensure that no less than 25 percent of overall program funds benefit disadvantaged communities during each program cycle. The guidelines shall establish a program definition for disadvantaged communities that may include, but need not be limited to, the definition in Section 39711 of the Health and Safety Code and the definition of low-income schools in paragraph (7) of subdivision (b) of former Section 2333.5, as that section read on January 1, 2013. A project eligible under this subdivision shall clearly demonstrate a benefit to a disadvantaged community or be directly located in a disadvantaged community.
(d)The guidelines shall allow streamlining of project delivery by authorizing an implementing agency to seek commission approval of a letter of no prejudice that will allow the agency to expend its own funds for a project programmed in a future year of the adopted program of projects, in advance of allocation of funds to the project by the commission, and to be reimbursed at a later time for eligible expenditures.
(e)The California Transportation Commission shall adopt the guidelines and selection criteria for, and define the types of projects eligible to be funded through, the program following at least two public hearings. Projects funded in this program shall be limited to active transportation projects. The guidelines shall ensure that eligible projects meet one or more of the goals set forth in Section 2380 and may give increased weight to projects meeting multiple goals.
(f)In developing the guidelines with regard to project eligibility, the commission shall include, but need not be limited to, the following project types:
(1)Development of new bikeways and walkways, or improvements to existing bikeways and walkways, that improve mobility, access, or safety for nonmotorized users. On and after January 1, 2026, the guidelines with regard to project eligibility shall not include the development of Class III bikeways, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless any of the following apply:
(A)The Class III bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less.
(B)The project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(C)The project applicant demonstrates that the use of the Class III bikeway or marking is appropriate for the local community context and advances a lower stress environment or a low-stress network.
(2)Secure bicycle parking at employment centers, park and ride lots, rail and transit stations, and ferry docks and landings.
(3)Bicycle-carrying facilities on public transit, including rail and ferries.
(4)Installation of traffic control devices to improve the safety of pedestrians and bicyclists.
(5)Elimination of hazardous conditions on existing bikeways and walkways.
(6)Maintenance of bikeways and walkways.
(7)Recreational trails and trailheads, park projects that facilitate trail linkages or connectivity to nonmotorized corridors, and conversion of abandoned railroad corridors to trails.
(8)Safe Routes to School projects that improve the safety of children walking and bicycling to school, in accordance with Section 1404 of Public Law 109-59.
(9)Safe routes to transit projects that encourage access to transit facilities and schoolbus stops by biking and walking, including, but not limited to, transit station areas, planned transit or schoolbus stops, transit corridors, transit-oriented development planning areas, and projects that will expand access to transit in underserved or rural areas.
(10)Educational programs to increase biking and walking, and other noninfrastructure investments that demonstrate effectiveness in increasing active transportation.
(g)In developing the guidelines with regard to project selection, the commission shall include, but need not be limited to, the following criteria:
(1)Demonstrated needs of the applicant.
(2)Potential for reducing pedestrian and bicyclist injuries and fatalities.
(3)Potential for encouraging increased walking and bicycling, especially among students.
(4)Identification of safety hazards for pedestrians and bicyclists.
(5)Identification of walking and bicycling routes to and from community centers, schools, transit stops, stations, and other transit facilities, including the potential for encouraging increased access to public transit.
(6)Identification of the local public participation process that culminated in the project proposal, which may include noticed public meetings and consultation with local stakeholders.
(7)Benefit to disadvantaged communities. In developing guidelines relative to this paragraph, the commission shall consider, but need not be limited to, the definition of disadvantaged communities as applied pursuant to subdivision (c).
(8)Cost-effectiveness, defined as maximizing the impact of the funds provided.
(9)The adoption by a city or county applicant of a bicycle transportation plan, pursuant to Section 891.2, a pedestrian plan, a safe routes to school plan, or an overall active transportation plan.
(10)Use of the California Conservation Corps or a qualified community conservation corps, as defined in Section 14507.5 of the Public Resources Code, as partners to undertake or construct applicable projects in accordance with Section 1524 of Public Law 112-141.
(11)Other factors, such as potential for reducing congestion, improving air quality, reducing greenhouse gas emissions, and increasing and improving connectivity and mobility of nonmotorized users. On and after January 1, 2026, increasing or improving connectivity of nonmotorized users shall not include the addition of a bikeway connecting to a Class III bikeway, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless the bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less or the project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(h)For the use of federal Transportation Alternatives Program funds, or other federal funds, commission guidelines shall meet all applicable federal requirements.
(i)For the use of federal Highway Safety Improvement Program funds for active transportation projects specific to reducing fatalities and serious injuries, the criteria for the selection of projects shall be based on a data-driven process that is aligned with the states Strategic Highway Safety Plan.
(j)The guidelines shall include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects in order to scale funding for larger or network-level active transportation improvements.
(k)The guidelines shall include a progressive range of penalties that range from a deduction of points to disqualification for an applicant that failed to use previously received program funds in a timely manner. In doing so, the commission shall consider factors that are not under the control of an applicant, which, at the discretion of the commission, may result in the imposition of no penalty or a delayed penalty.
(l)The guidelines shall include a requirement that an applicant consult with the executive officer of a transit agency operating in a project corridor if the project will be adjacent to an existing bus, shuttle, or paratransit route. The consultation should provide project information, expected impact on the transit route, and a statement that the applicant will continue consulting with the transit agency should the grant be awarded.
(m)In reviewing and selecting projects funded by federal funds in the Recreational Trails Program, the commission shall collaborate with the Department of Parks and Recreation to evaluate proposed projects, and to ensure federal requirements are met.
(n)To ensure that regional agencies charged with allocating funds to projects pursuant to paragraph (1) of subdivision (a) of Section 2381 have sufficient discretion to develop regional guidelines, the commission may adopt separate guidelines for the state and for the regional agencies relative to subdivision (g).
(o)This section shall become operative on January 1, 2028.
There is hereby established the Active Transportation Program in the department for the purpose of encouraging increased use of active modes of transportation, such as biking and walking. It is the intent of the Legislature that the program achieve all of the following goals:
(a)Increase the proportion of trips accomplished by biking and walking, including, but not limited to, access to public transit stops, stations, and other transit facilities.
(b)Increase safety and mobility for nonmotorized users.
(c)Advance the active transportation efforts of regional agencies to achieve greenhouse gas reduction goals as established pursuant to Senate Bill 375 (Chapter 728, Statutes of 2008) and Senate Bill 391 (Chapter 585, Statutes of 2009).
(d)Enhance public health, including reduction of childhood obesity through the use of programs including, but not limited to, projects eligible for Safe Routes to School Program funding.
(e)Ensure that disadvantaged communities fully share in the benefits of the program.
(f)Provide a broad spectrum of projects to benefit many types of active transportation users.
SEC. 2.Section 2382 of the Streets and Highways Code is amended to read:2382.(a)The California Transportation Commission shall develop guidelines and project selection criteria for the Active Transportation Program in consultation with the Active Transportation Program Workgroup, which shall be formed for purposes of providing guidance on matters including, but not limited to, development of and subsequent revisions to program guidelines, schedules and procedures, project selection criteria, performance measures, and program evaluation. The workgroup shall include, but not be limited to, representatives of government agencies and active transportation stakeholder organizations with expertise in pedestrian and bicycle issues, including Safe Routes to School programs.
(b)The guidelines shall be the complete and full statement of the policies and criteria that the commission intends to use in selecting projects to be included in the program. The guidelines shall address subjects that include, but are not limited to, project eligibility, application timelines, application rating and ranking criteria, project monitoring, reporting, and transparency, and project performance measurement.
(c)The guidelines shall include a process to ensure that no less than 25 percent of overall program funds benefit disadvantaged communities during each program cycle. The guidelines shall establish a program definition for disadvantaged communities that may include, but need not be limited to, the definition in Section 39711 of the Health and Safety Code and the definition of low-income schools in paragraph (7) of subdivision (b) of former Section 2333.5, as that section read on January 1, 2013. A project eligible under this subdivision shall clearly demonstrate a benefit to a disadvantaged community or be directly located in a disadvantaged community.
(d)The guidelines shall allow streamlining of project delivery by authorizing an implementing agency to seek commission approval of a letter of no prejudice that will allow the agency to expend its own funds for a project programmed in a future year of the adopted program of projects, in advance of allocation of funds to the project by the commission, and to be reimbursed at a later time for eligible expenditures.
(e)The California Transportation Commission shall adopt the guidelines and selection criteria for, and define the types of projects eligible to be funded through, the program following at least two public hearings. Projects funded in this program shall be limited to active transportation projects. The guidelines shall ensure that eligible projects meet one or more of the goals set forth in Section 2380 and may give increased weight to projects meeting multiple goals.
(f)In developing the guidelines with regard to project eligibility, the commission shall include, but need not be limited to, the following project types:
(1)Development of new bikeways and walkways, or improvements to existing bikeways and walkways, that improve mobility, access, or safety for nonmotorized users. On and after January 1, 2026, the guidelines with regard to project eligibility shall not include the development of Class III bikeways, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless any of the following apply:
(A)The Class III bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less.
(B)The project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(C)The project applicant demonstrates that the use of the Class III bikeway or marking is appropriate for the local community context and advances a lower stress environment or a low-stress network.
(2)Secure bicycle parking at employment centers, park and ride lots, rail and transit stations, and ferry docks and landings.
(3)Bicycle-carrying facilities on public transit, including rail and ferries.
(4)Installation of traffic control devices to improve the safety of pedestrians and bicyclists.
(5)Elimination of hazardous conditions on existing bikeways and walkways.
(6)Maintenance of bikeways and walkways.
(7)Recreational trails and trailheads, park projects that facilitate trail linkages or connectivity to nonmotorized corridors, and conversion of abandoned railroad corridors to trails.
(8)Safe Routes to School projects that improve the safety of children walking and bicycling to school, in accordance with Section 1404 of Public Law 109-59.
(9)Safe routes to transit projects, which will encourage transit by improving biking and walking routes to mass transportation facilities and schoolbus stops.
(10)Educational programs to increase biking and walking, and other noninfrastructure investments that demonstrate effectiveness in increasing active transportation.
(g)In developing the guidelines with regard to project selection, the commission shall include, but need not be limited to, the following criteria:
(1)Demonstrated needs of the applicant.
(2)Potential for reducing pedestrian and bicyclist injuries and fatalities.
(3)Potential for encouraging increased walking and bicycling, especially among students.
(4)Identification of safety hazards for pedestrians and bicyclists.
(5)Identification of walking and bicycling routes to and from schools, transit facilities, and community centers.
(6)Identification of the local public participation process that culminated in the project proposal, which may include noticed public meetings and consultation with local stakeholders.
(7)Benefit to disadvantaged communities. In developing guidelines relative to this paragraph, the commission shall consider, but need not be limited to, the definition of disadvantaged communities as applied pursuant to subdivision (c).
(8)Cost-effectiveness, defined as maximizing the impact of the funds provided.
(9)The adoption by a city or county applicant of a bicycle transportation plan, pursuant to Section 891.2, a pedestrian plan, a safe routes to school plan, or an overall active transportation plan.
(10)Use of the California Conservation Corps or a qualified community conservation corps, as defined in Section 14507.5 of the Public Resources Code, as partners to undertake or construct applicable projects in accordance with Section 1524 of Public Law 112-141.
(11)Other factors, such as potential for reducing congestion, improving air quality, reducing greenhouse gas emissions, and increasing and improving connectivity and mobility of nonmotorized users. On and after January 1, 2026, increasing or improving connectivity of nonmotorized users shall not include the addition of a bikeway connecting to a Class III bikeway, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless the bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less or the project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(h)For the use of federal Transportation Alternative Program funds, or other federal funds, commission guidelines shall meet all applicable federal requirements.
(i)For the use of federal Highway Safety Improvement Program funds for active transportation projects specific to reducing fatalities and serious injuries, the criteria for the selection of projects shall be based on a data-driven process that is aligned with the states Strategic Highway Safety Plan.
(j)The guidelines may include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects.
(k)In reviewing and selecting projects funded by federal funds in the Recreational Trails Program, the commission shall collaborate with the Department of Parks and Recreation to evaluate proposed projects, and to ensure federal requirements are met.
(l)To ensure that regional agencies charged with allocating funds to projects pursuant to paragraph (1) of subdivision (a) of Section 2381 have sufficient discretion to develop regional guidelines, the commission may adopt separate guidelines for the state and for the regional agencies relative to subdivision (g).
(m)This section shall remain in effect only until January 1, 2028, and as of that date is repealed.
SEC. 3.Section 2382 is added to the Streets and Highways Code, to read:2382.(a)The California Transportation Commission shall develop guidelines and project selection criteria for the Active Transportation Program in consultation with the Active Transportation Program Workgroup, which shall be formed for purposes of providing guidance on matters, including, but not limited to, development of and subsequent revisions to program guidelines, schedules and procedures, project selection criteria, performance measures, and program evaluation. The workgroup shall include, but not be limited to, representatives of governmental agencies and active transportation stakeholder organizations with expertise in pedestrian and bicycle issues, including Safe Routes to School programs.
(b)The guidelines shall be the complete and full statement of the policies and criteria that the commission intends to use in selecting projects to be included in the program. The guidelines shall address subjects that include, but are not limited to, project eligibility, application timelines, application rating and ranking criteria, project monitoring, reporting, and transparency, and project performance measurement.
(c)The guidelines shall include a process to ensure that no less than 25 percent of overall program funds benefit disadvantaged communities during each program cycle. The guidelines shall establish a program definition for disadvantaged communities that may include, but need not be limited to, the definition in Section 39711 of the Health and Safety Code and the definition of low-income schools in paragraph (7) of subdivision (b) of former Section 2333.5, as that section read on January 1, 2013. A project eligible under this subdivision shall clearly demonstrate a benefit to a disadvantaged community or be directly located in a disadvantaged community.
(d)The guidelines shall allow streamlining of project delivery by authorizing an implementing agency to seek commission approval of a letter of no prejudice that will allow the agency to expend its own funds for a project programmed in a future year of the adopted program of projects, in advance of allocation of funds to the project by the commission, and to be reimbursed at a later time for eligible expenditures.
(e)The California Transportation Commission shall adopt the guidelines and selection criteria for, and define the types of projects eligible to be funded through, the program following at least two public hearings. Projects funded in this program shall be limited to active transportation projects. The guidelines shall ensure that eligible projects meet one or more of the goals set forth in Section 2380 and may give increased weight to projects meeting multiple goals.
(f)In developing the guidelines with regard to project eligibility, the commission shall include, but need not be limited to, the following project types:
(1)Development of new bikeways and walkways, or improvements to existing bikeways and walkways, that improve mobility, access, or safety for nonmotorized users. On and after January 1, 2026, the guidelines with regard to project eligibility shall not include the development of Class III bikeways, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless any of the following apply:
(A)The Class III bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less.
(B)The project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(C)The project applicant demonstrates that the use of the Class III bikeway or marking is appropriate for the local community context and advances a lower stress environment or a low-stress network.
(2)Secure bicycle parking at employment centers, park and ride lots, rail and transit stations, and ferry docks and landings.
(3)Bicycle-carrying facilities on public transit, including rail and ferries.
(4)Installation of traffic control devices to improve the safety of pedestrians and bicyclists.
(5)Elimination of hazardous conditions on existing bikeways and walkways.
(6)Maintenance of bikeways and walkways.
(7)Recreational trails and trailheads, park projects that facilitate trail linkages or connectivity to nonmotorized corridors, and conversion of abandoned railroad corridors to trails.
(8)Safe Routes to School projects that improve the safety of children walking and bicycling to school, in accordance with Section 1404 of Public Law 109-59.
(9)Safe routes to transit projects that encourage access to transit facilities and schoolbus stops by biking and walking, including, but not limited to, transit station areas, planned transit or schoolbus stops, transit corridors, transit-oriented development planning areas, and projects that will expand access to transit in underserved or rural areas.
(10)Educational programs to increase biking and walking, and other noninfrastructure investments that demonstrate effectiveness in increasing active transportation.
(g)In developing the guidelines with regard to project selection, the commission shall include, but need not be limited to, the following criteria:
(1)Demonstrated needs of the applicant.
(2)Potential for reducing pedestrian and bicyclist injuries and fatalities.
(3)Potential for encouraging increased walking and bicycling, especially among students.
(4)Identification of safety hazards for pedestrians and bicyclists.
(5)Identification of walking and bicycling routes to and from community centers, schools, transit stops, stations, and other transit facilities, including the potential for encouraging increased access to public transit.
(6)Identification of the local public participation process that culminated in the project proposal, which may include noticed public meetings and consultation with local stakeholders.
(7)Benefit to disadvantaged communities. In developing guidelines relative to this paragraph, the commission shall consider, but need not be limited to, the definition of disadvantaged communities as applied pursuant to subdivision (c).
(8)Cost-effectiveness, defined as maximizing the impact of the funds provided.
(9)The adoption by a city or county applicant of a bicycle transportation plan, pursuant to Section 891.2, a pedestrian plan, a safe routes to school plan, or an overall active transportation plan.
(10)Use of the California Conservation Corps or a qualified community conservation corps, as defined in Section 14507.5 of the Public Resources Code, as partners to undertake or construct applicable projects in accordance with Section 1524 of Public Law 112-141.
(11)Other factors, such as potential for reducing congestion, improving air quality, reducing greenhouse gas emissions, and increasing and improving connectivity and mobility of nonmotorized users. On and after January 1, 2026, increasing or improving connectivity of nonmotorized users shall not include the addition of a bikeway connecting to a Class III bikeway, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless the bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less or the project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(h)For the use of federal Transportation Alternatives Program funds, or other federal funds, commission guidelines shall meet all applicable federal requirements.
(i)For the use of federal Highway Safety Improvement Program funds for active transportation projects specific to reducing fatalities and serious injuries, the criteria for the selection of projects shall be based on a data-driven process that is aligned with the states Strategic Highway Safety Plan.
(j)The guidelines shall include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects in order to scale funding for larger or network-level active transportation improvements.
(k)The guidelines shall include a progressive range of penalties that range from a deduction of points to disqualification for an applicant that failed to use previously received program funds in a timely manner. In doing so, the commission shall consider factors that are not under the control of an applicant, which, at the discretion of the commission, may result in the imposition of no penalty or a delayed penalty.
(l)The guidelines shall include a requirement that an applicant consult with the executive officer of a transit agency operating in a project corridor if the project will be adjacent to an existing bus, shuttle, or paratransit route. The consultation should provide project information, expected impact on the transit route, and a statement that the applicant will continue consulting with the transit agency should the grant be awarded.
(m)In reviewing and selecting projects funded by federal funds in the Recreational Trails Program, the commission shall collaborate with the Department of Parks and Recreation to evaluate proposed projects, and to ensure federal requirements are met.
(n)To ensure that regional agencies charged with allocating funds to projects pursuant to paragraph (1) of subdivision (a) of Section 2381 have sufficient discretion to develop regional guidelines, the commission may adopt separate guidelines for the state and for the regional agencies relative to subdivision (g).
(o)This section shall become operative on January 1, 2028.
There is hereby established the Active Transportation Program in the department for the purpose of encouraging increased use of active modes of transportation, such as biking and walking. It is the intent of the Legislature that the program achieve all of the following goals:
(a)Increase the proportion of trips accomplished by biking and walking, including, but not limited to, access to public transit stops, stations, and other transit facilities.
(b)Increase safety and mobility for nonmotorized users.
(c)Advance the active transportation efforts of regional agencies to achieve greenhouse gas reduction goals as established pursuant to Senate Bill 375 (Chapter 728, Statutes of 2008) and Senate Bill 391 (Chapter 585, Statutes of 2009).
(d)Enhance public health, including reduction of childhood obesity through the use of programs including, but not limited to, projects eligible for Safe Routes to School Program funding.
(e)Ensure that disadvantaged communities fully share in the benefits of the program.
(f)Provide a broad spectrum of projects to benefit many types of active transportation users.
SEC. 2.Section 2382 of the Streets and Highways Code is amended to read:2382.(a)The California Transportation Commission shall develop guidelines and project selection criteria for the Active Transportation Program in consultation with the Active Transportation Program Workgroup, which shall be formed for purposes of providing guidance on matters including, but not limited to, development of and subsequent revisions to program guidelines, schedules and procedures, project selection criteria, performance measures, and program evaluation. The workgroup shall include, but not be limited to, representatives of government agencies and active transportation stakeholder organizations with expertise in pedestrian and bicycle issues, including Safe Routes to School programs.
(b)The guidelines shall be the complete and full statement of the policies and criteria that the commission intends to use in selecting projects to be included in the program. The guidelines shall address subjects that include, but are not limited to, project eligibility, application timelines, application rating and ranking criteria, project monitoring, reporting, and transparency, and project performance measurement.
(c)The guidelines shall include a process to ensure that no less than 25 percent of overall program funds benefit disadvantaged communities during each program cycle. The guidelines shall establish a program definition for disadvantaged communities that may include, but need not be limited to, the definition in Section 39711 of the Health and Safety Code and the definition of low-income schools in paragraph (7) of subdivision (b) of former Section 2333.5, as that section read on January 1, 2013. A project eligible under this subdivision shall clearly demonstrate a benefit to a disadvantaged community or be directly located in a disadvantaged community.
(d)The guidelines shall allow streamlining of project delivery by authorizing an implementing agency to seek commission approval of a letter of no prejudice that will allow the agency to expend its own funds for a project programmed in a future year of the adopted program of projects, in advance of allocation of funds to the project by the commission, and to be reimbursed at a later time for eligible expenditures.
(e)The California Transportation Commission shall adopt the guidelines and selection criteria for, and define the types of projects eligible to be funded through, the program following at least two public hearings. Projects funded in this program shall be limited to active transportation projects. The guidelines shall ensure that eligible projects meet one or more of the goals set forth in Section 2380 and may give increased weight to projects meeting multiple goals.
(f)In developing the guidelines with regard to project eligibility, the commission shall include, but need not be limited to, the following project types:
(1)Development of new bikeways and walkways, or improvements to existing bikeways and walkways, that improve mobility, access, or safety for nonmotorized users. On and after January 1, 2026, the guidelines with regard to project eligibility shall not include the development of Class III bikeways, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless any of the following apply:
(A)The Class III bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less.
(B)The project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(C)The project applicant demonstrates that the use of the Class III bikeway or marking is appropriate for the local community context and advances a lower stress environment or a low-stress network.
(2)Secure bicycle parking at employment centers, park and ride lots, rail and transit stations, and ferry docks and landings.
(3)Bicycle-carrying facilities on public transit, including rail and ferries.
(4)Installation of traffic control devices to improve the safety of pedestrians and bicyclists.
(5)Elimination of hazardous conditions on existing bikeways and walkways.
(6)Maintenance of bikeways and walkways.
(7)Recreational trails and trailheads, park projects that facilitate trail linkages or connectivity to nonmotorized corridors, and conversion of abandoned railroad corridors to trails.
(8)Safe Routes to School projects that improve the safety of children walking and bicycling to school, in accordance with Section 1404 of Public Law 109-59.
(9)Safe routes to transit projects, which will encourage transit by improving biking and walking routes to mass transportation facilities and schoolbus stops.
(10)Educational programs to increase biking and walking, and other noninfrastructure investments that demonstrate effectiveness in increasing active transportation.
(g)In developing the guidelines with regard to project selection, the commission shall include, but need not be limited to, the following criteria:
(1)Demonstrated needs of the applicant.
(2)Potential for reducing pedestrian and bicyclist injuries and fatalities.
(3)Potential for encouraging increased walking and bicycling, especially among students.
(4)Identification of safety hazards for pedestrians and bicyclists.
(5)Identification of walking and bicycling routes to and from schools, transit facilities, and community centers.
(6)Identification of the local public participation process that culminated in the project proposal, which may include noticed public meetings and consultation with local stakeholders.
(7)Benefit to disadvantaged communities. In developing guidelines relative to this paragraph, the commission shall consider, but need not be limited to, the definition of disadvantaged communities as applied pursuant to subdivision (c).
(8)Cost-effectiveness, defined as maximizing the impact of the funds provided.
(9)The adoption by a city or county applicant of a bicycle transportation plan, pursuant to Section 891.2, a pedestrian plan, a safe routes to school plan, or an overall active transportation plan.
(10)Use of the California Conservation Corps or a qualified community conservation corps, as defined in Section 14507.5 of the Public Resources Code, as partners to undertake or construct applicable projects in accordance with Section 1524 of Public Law 112-141.
(11)Other factors, such as potential for reducing congestion, improving air quality, reducing greenhouse gas emissions, and increasing and improving connectivity and mobility of nonmotorized users. On and after January 1, 2026, increasing or improving connectivity of nonmotorized users shall not include the addition of a bikeway connecting to a Class III bikeway, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless the bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less or the project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(h)For the use of federal Transportation Alternative Program funds, or other federal funds, commission guidelines shall meet all applicable federal requirements.
(i)For the use of federal Highway Safety Improvement Program funds for active transportation projects specific to reducing fatalities and serious injuries, the criteria for the selection of projects shall be based on a data-driven process that is aligned with the states Strategic Highway Safety Plan.
(j)The guidelines may include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects.
(k)In reviewing and selecting projects funded by federal funds in the Recreational Trails Program, the commission shall collaborate with the Department of Parks and Recreation to evaluate proposed projects, and to ensure federal requirements are met.
(l)To ensure that regional agencies charged with allocating funds to projects pursuant to paragraph (1) of subdivision (a) of Section 2381 have sufficient discretion to develop regional guidelines, the commission may adopt separate guidelines for the state and for the regional agencies relative to subdivision (g).
(m)This section shall remain in effect only until January 1, 2028, and as of that date is repealed.
SEC. 3.Section 2382 is added to the Streets and Highways Code, to read:2382.(a)The California Transportation Commission shall develop guidelines and project selection criteria for the Active Transportation Program in consultation with the Active Transportation Program Workgroup, which shall be formed for purposes of providing guidance on matters, including, but not limited to, development of and subsequent revisions to program guidelines, schedules and procedures, project selection criteria, performance measures, and program evaluation. The workgroup shall include, but not be limited to, representatives of governmental agencies and active transportation stakeholder organizations with expertise in pedestrian and bicycle issues, including Safe Routes to School programs.
(b)The guidelines shall be the complete and full statement of the policies and criteria that the commission intends to use in selecting projects to be included in the program. The guidelines shall address subjects that include, but are not limited to, project eligibility, application timelines, application rating and ranking criteria, project monitoring, reporting, and transparency, and project performance measurement.
(c)The guidelines shall include a process to ensure that no less than 25 percent of overall program funds benefit disadvantaged communities during each program cycle. The guidelines shall establish a program definition for disadvantaged communities that may include, but need not be limited to, the definition in Section 39711 of the Health and Safety Code and the definition of low-income schools in paragraph (7) of subdivision (b) of former Section 2333.5, as that section read on January 1, 2013. A project eligible under this subdivision shall clearly demonstrate a benefit to a disadvantaged community or be directly located in a disadvantaged community.
(d)The guidelines shall allow streamlining of project delivery by authorizing an implementing agency to seek commission approval of a letter of no prejudice that will allow the agency to expend its own funds for a project programmed in a future year of the adopted program of projects, in advance of allocation of funds to the project by the commission, and to be reimbursed at a later time for eligible expenditures.
(e)The California Transportation Commission shall adopt the guidelines and selection criteria for, and define the types of projects eligible to be funded through, the program following at least two public hearings. Projects funded in this program shall be limited to active transportation projects. The guidelines shall ensure that eligible projects meet one or more of the goals set forth in Section 2380 and may give increased weight to projects meeting multiple goals.
(f)In developing the guidelines with regard to project eligibility, the commission shall include, but need not be limited to, the following project types:
(1)Development of new bikeways and walkways, or improvements to existing bikeways and walkways, that improve mobility, access, or safety for nonmotorized users. On and after January 1, 2026, the guidelines with regard to project eligibility shall not include the development of Class III bikeways, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless any of the following apply:
(A)The Class III bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less.
(B)The project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(C)The project applicant demonstrates that the use of the Class III bikeway or marking is appropriate for the local community context and advances a lower stress environment or a low-stress network.
(2)Secure bicycle parking at employment centers, park and ride lots, rail and transit stations, and ferry docks and landings.
(3)Bicycle-carrying facilities on public transit, including rail and ferries.
(4)Installation of traffic control devices to improve the safety of pedestrians and bicyclists.
(5)Elimination of hazardous conditions on existing bikeways and walkways.
(6)Maintenance of bikeways and walkways.
(7)Recreational trails and trailheads, park projects that facilitate trail linkages or connectivity to nonmotorized corridors, and conversion of abandoned railroad corridors to trails.
(8)Safe Routes to School projects that improve the safety of children walking and bicycling to school, in accordance with Section 1404 of Public Law 109-59.
(9)Safe routes to transit projects that encourage access to transit facilities and schoolbus stops by biking and walking, including, but not limited to, transit station areas, planned transit or schoolbus stops, transit corridors, transit-oriented development planning areas, and projects that will expand access to transit in underserved or rural areas.
(10)Educational programs to increase biking and walking, and other noninfrastructure investments that demonstrate effectiveness in increasing active transportation.
(g)In developing the guidelines with regard to project selection, the commission shall include, but need not be limited to, the following criteria:
(1)Demonstrated needs of the applicant.
(2)Potential for reducing pedestrian and bicyclist injuries and fatalities.
(3)Potential for encouraging increased walking and bicycling, especially among students.
(4)Identification of safety hazards for pedestrians and bicyclists.
(5)Identification of walking and bicycling routes to and from community centers, schools, transit stops, stations, and other transit facilities, including the potential for encouraging increased access to public transit.
(6)Identification of the local public participation process that culminated in the project proposal, which may include noticed public meetings and consultation with local stakeholders.
(7)Benefit to disadvantaged communities. In developing guidelines relative to this paragraph, the commission shall consider, but need not be limited to, the definition of disadvantaged communities as applied pursuant to subdivision (c).
(8)Cost-effectiveness, defined as maximizing the impact of the funds provided.
(9)The adoption by a city or county applicant of a bicycle transportation plan, pursuant to Section 891.2, a pedestrian plan, a safe routes to school plan, or an overall active transportation plan.
(10)Use of the California Conservation Corps or a qualified community conservation corps, as defined in Section 14507.5 of the Public Resources Code, as partners to undertake or construct applicable projects in accordance with Section 1524 of Public Law 112-141.
(11)Other factors, such as potential for reducing congestion, improving air quality, reducing greenhouse gas emissions, and increasing and improving connectivity and mobility of nonmotorized users. On and after January 1, 2026, increasing or improving connectivity of nonmotorized users shall not include the addition of a bikeway connecting to a Class III bikeway, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless the bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less or the project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(12)Recommendations to maximize commitments of state transportation improvement program funds to projects funded by the program in order to scale funding for larger or network-level active transportation improvements.(h)For the use of federal Transportation Alternatives Program funds, or other federal funds, commission guidelines shall meet all applicable federal requirements.
(i)For the use of federal Highway Safety Improvement Program funds for active transportation projects specific to reducing fatalities and serious injuries, the criteria for the selection of projects shall be based on a data-driven process that is aligned with the states Strategic Highway Safety Plan.
(j)The guidelines shall include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects. projects in order to scale funding for larger or network-level active transportation improvements.
(k)The guidelines shall include a progressive range of penalties that range from a deduction of points to disqualification for an applicant that failed to use previously received program funds in a timely manner. In doing so, the commission shall consider factors that are not under the control of an applicant. applicant, which, at the discretion of the commission, may result in the imposition of no penalty or a delayed penalty.
(l)The guidelines shall include a requirement that an applicant consult with the executive officer of a transit agency operating in a project corridor if the project will be adjacent to an existing bus, shuttle, or paratransit route. The consultation should provide project information, expected impact on the transit route, and a statement that the applicant will continue consulting with the transit agency should the grant be awarded.
(l)(m)In reviewing and selecting projects funded by federal funds in the Recreational Trails Program, the commission shall collaborate with the Department of Parks and Recreation to evaluate proposed projects, and to ensure federal requirements are met.
(m)(n)To ensure that regional agencies charged with allocating funds to projects pursuant to paragraph (1) of subdivision (a) of Section 2381 have sufficient discretion to develop regional guidelines, the commission may adopt separate guidelines for the state and for the regional agencies relative to subdivision (g).
(n)(o)This section shall become operative on January 1, 2028.
There is hereby established the Active Transportation Program in the department for the purpose of encouraging increased use of active modes of transportation, such as biking and walking. It is the intent of the Legislature that the program achieve all of the following goals:
(a)Increase the proportion of trips accomplished by biking and walking, including, but not limited to, access to public transit stops, stations, and other transit facilities.
(b)Increase safety and mobility for nonmotorized users.
(c)Advance the active transportation efforts of regional agencies to achieve greenhouse gas reduction goals as established pursuant to Senate Bill 375 (Chapter 728, Statutes of 2008) and Senate Bill 391 (Chapter 585, Statutes of 2009).
(d)Enhance public health, including reduction of childhood obesity through the use of programs including, but not limited to, projects eligible for Safe Routes to School Program funding.
(e)Ensure that disadvantaged communities fully share in the benefits of the program.
(f)Provide a broad spectrum of projects to benefit many types of active transportation users.
SEC. 2.Section 2382 of the Streets and Highways Code is amended to read:2382.(a)The California Transportation Commission shall develop guidelines and project selection criteria for the Active Transportation Program in consultation with the Active Transportation Program Workgroup, which shall be formed for purposes of providing guidance on matters including, but not limited to, development of and subsequent revisions to program guidelines, schedules and procedures, project selection criteria, performance measures, and program evaluation. The workgroup shall include, but not be limited to, representatives of government agencies and active transportation stakeholder organizations with expertise in pedestrian and bicycle issues, including Safe Routes to School programs.(b)The guidelines shall be the complete and full statement of the policies and criteria that the commission intends to use in selecting projects to be included in the program. The guidelines shall address subjects that include, but are not limited to, project eligibility, application timelines, application rating and ranking criteria, project monitoring, reporting, and transparency, and project performance measurement.(c)The guidelines shall include a process to ensure that no less than 25 percent of overall program funds benefit disadvantaged communities during each program cycle. The guidelines shall establish a program definition for disadvantaged communities that may include, but need not be limited to, the definition in Section 39711 of the Health and Safety Code and the definition of low-income schools in paragraph (7) of subdivision (b) of former Section 2333.5, as that section read on January 1, 2013. A project eligible under this subdivision shall clearly demonstrate a benefit to a disadvantaged community or be directly located in a disadvantaged community.(d)The guidelines shall allow streamlining of project delivery by authorizing an implementing agency to seek commission approval of a letter of no prejudice that will allow the agency to expend its own funds for a project programmed in a future year of the adopted program of projects, in advance of allocation of funds to the project by the commission, and to be reimbursed at a later time for eligible expenditures.(e)The California Transportation Commission shall adopt the guidelines and selection criteria for, and define the types of projects eligible to be funded through, the program following at least two public hearings. Projects funded in this program shall be limited to active transportation projects. The guidelines shall ensure that eligible projects meet one or more of the goals set forth in Section 2380 and may give increased weight to projects meeting multiple goals.(f)In developing the guidelines with regard to project eligibility, the commission shall include, but need not be limited to, the following project types:(1)Development of new bikeways and walkways, or improvements to existing bikeways and walkways, that improve mobility, access, or safety for nonmotorized users. On and after January 1, 2026, the guidelines with regard to project eligibility shall not include the development of Class III bikeways, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless any of the following apply:(A)The Class III bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less.(B)The project will implement improvements to reduce the design speed limit to 25 miles per hour or less.(C)The project applicant demonstrates that the use of the Class III bikeway or marking is appropriate for the local community context and advances a lower stress environment or a low-stress network.(2)Secure bicycle parking at employment centers, park and ride lots, rail and transit stations, and ferry docks and landings.(3)Bicycle-carrying facilities on public transit, including rail and ferries.(4)Installation of traffic control devices to improve the safety of pedestrians and bicyclists.(5)Elimination of hazardous conditions on existing bikeways and walkways.(6)Maintenance of bikeways and walkways.(7)Recreational trails and trailheads, park projects that facilitate trail linkages or connectivity to nonmotorized corridors, and conversion of abandoned railroad corridors to trails.(8)Safe Routes to School projects that improve the safety of children walking and bicycling to school, in accordance with Section 1404 of Public Law 109-59.(9)Safe routes to transit projects that encourage access to transit facilities and schoolbus stops by biking and walking, including, but not limited to, transit station areas, planned transit or schoolbus stops, transit corridors, transit-oriented development planning areas, and projects that will expand access to transit in underserved or rural areas.(10)Educational programs to increase biking and walking, and other noninfrastructure investments that demonstrate effectiveness in increasing active transportation.(g)In developing the guidelines with regard to project selection, the commission shall include, but need not be limited to, the following criteria:(1)Demonstrated needs of the applicant.(2)Potential for reducing pedestrian and bicyclist injuries and fatalities.(3)Potential for encouraging increased walking and bicycling, especially among students.(4)Identification of safety hazards for pedestrians and bicyclists.(5)Identification of walking and bicycling routes to and from community centers, schools, transit stops, stations, and other transit facilities, including the potential for encouraging increased access to public transit.(6)Identification of the local public participation process that culminated in the project proposal, which may include noticed public meetings and consultation with local stakeholders.(7)Benefit to disadvantaged communities. In developing guidelines relative to this paragraph, the commission shall consider, but need not be limited to, the definition of disadvantaged communities as applied pursuant to subdivision (c).(8)Cost-effectiveness, defined as maximizing the impact of the funds provided.(9)The adoption by a city or county applicant of a bicycle transportation plan, pursuant to Section 891.2, a pedestrian plan, a safe routes to school plan, or an overall active transportation plan.(10)Use of the California Conservation Corps or a qualified community conservation corps, as defined in Section 14507.5 of the Public Resources Code, as partners to undertake or construct applicable projects in accordance with Section 1524 of Public Law 112-141.(11)Other factors, such as potential for reducing congestion, improving air quality, reducing greenhouse gas emissions, and increasing and improving connectivity and mobility of nonmotorized users. On and after January 1, 2026, increasing or improving connectivity of nonmotorized users shall not include the addition of a bikeway connecting to a Class III bikeway, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless the bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less or the project will implement improvements to reduce the design speed limit to 25 miles per hour or less.(12)Recommendations to maximize commitments of state transportation improvement program funds to projects funded by the program in order to scale funding for larger or network-level active transportation improvements.(h)For the use of federal Transportation Alternative Program funds, or other federal funds, commission guidelines shall meet all applicable federal requirements.(i)For the use of federal Highway Safety Improvement Program funds for active transportation projects specific to reducing fatalities and serious injuries, the criteria for the selection of projects shall be based on a data-driven process that is aligned with the states Strategic Highway Safety Plan.(j)The guidelines shall include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects.(k)The guidelines shall include a progressive range of penalties that range from a deduction of points to disqualification for an applicant that failed to use previously received program funds in a timely manner. In doing so, the commission shall consider factors that are not under the control of an applicant.(l)In reviewing and selecting projects funded by federal funds in the Recreational Trails Program, the commission shall collaborate with the Department of Parks and Recreation to evaluate proposed projects, and to ensure federal requirements are met.(m)To ensure that regional agencies charged with allocating funds to projects pursuant to paragraph (1) of subdivision (a) of Section 2381 have sufficient discretion to develop regional guidelines, the commission may adopt separate guidelines for the state and for the regional agencies relative to subdivision (g).SEC. 2.Section 2382 of the Streets and Highways Code is amended to read:2382.(a)The California Transportation Commission shall develop guidelines and project selection criteria for the Active Transportation Program in consultation with the Active Transportation Program Workgroup, which shall be formed for purposes of providing guidance on matters including, but not limited to, development of and subsequent revisions to program guidelines, schedules and procedures, project selection criteria, performance measures, and program evaluation. The workgroup shall include, but not be limited to, representatives of government agencies and active transportation stakeholder organizations with expertise in pedestrian and bicycle issues, including Safe Routes to School programs.
(b)The guidelines shall be the complete and full statement of the policies and criteria that the commission intends to use in selecting projects to be included in the program. The guidelines shall address subjects that include, but are not limited to, project eligibility, application timelines, application rating and ranking criteria, project monitoring, reporting, and transparency, and project performance measurement.
(c)The guidelines shall include a process to ensure that no less than 25 percent of overall program funds benefit disadvantaged communities during each program cycle. The guidelines shall establish a program definition for disadvantaged communities that may include, but need not be limited to, the definition in Section 39711 of the Health and Safety Code and the definition of low-income schools in paragraph (7) of subdivision (b) of former Section 2333.5, as that section read on January 1, 2013. A project eligible under this subdivision shall clearly demonstrate a benefit to a disadvantaged community or be directly located in a disadvantaged community.
(d)The guidelines shall allow streamlining of project delivery by authorizing an implementing agency to seek commission approval of a letter of no prejudice that will allow the agency to expend its own funds for a project programmed in a future year of the adopted program of projects, in advance of allocation of funds to the project by the commission, and to be reimbursed at a later time for eligible expenditures.
(e)The California Transportation Commission shall adopt the guidelines and selection criteria for, and define the types of projects eligible to be funded through, the program following at least two public hearings. Projects funded in this program shall be limited to active transportation projects. The guidelines shall ensure that eligible projects meet one or more of the goals set forth in Section 2380 and may give increased weight to projects meeting multiple goals.
(f)In developing the guidelines with regard to project eligibility, the commission shall include, but need not be limited to, the following project types:
(1)Development of new bikeways and walkways, or improvements to existing bikeways and walkways, that improve mobility, access, or safety for nonmotorized users. On and after January 1, 2026, the guidelines with regard to project eligibility shall not include the development of Class III bikeways, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless any of the following apply:
(A)The Class III bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less.
(B)The project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(C)The project applicant demonstrates that the use of the Class III bikeway or marking is appropriate for the local community context and advances a lower stress environment or a low-stress network.
(2)Secure bicycle parking at employment centers, park and ride lots, rail and transit stations, and ferry docks and landings.
(3)Bicycle-carrying facilities on public transit, including rail and ferries.
(4)Installation of traffic control devices to improve the safety of pedestrians and bicyclists.
(5)Elimination of hazardous conditions on existing bikeways and walkways.
(6)Maintenance of bikeways and walkways.
(7)Recreational trails and trailheads, park projects that facilitate trail linkages or connectivity to nonmotorized corridors, and conversion of abandoned railroad corridors to trails.
(8)Safe Routes to School projects that improve the safety of children walking and bicycling to school, in accordance with Section 1404 of Public Law 109-59.
(9)Safe routes to transit projects, which will encourage transit by improving biking and walking routes to mass transportation facilities and schoolbus stops.
(10)Educational programs to increase biking and walking, and other noninfrastructure investments that demonstrate effectiveness in increasing active transportation.
(g)In developing the guidelines with regard to project selection, the commission shall include, but need not be limited to, the following criteria:
(1)Demonstrated needs of the applicant.
(2)Potential for reducing pedestrian and bicyclist injuries and fatalities.
(3)Potential for encouraging increased walking and bicycling, especially among students.
(4)Identification of safety hazards for pedestrians and bicyclists.
(5)Identification of walking and bicycling routes to and from schools, transit facilities, and community centers.
(6)Identification of the local public participation process that culminated in the project proposal, which may include noticed public meetings and consultation with local stakeholders.
(7)Benefit to disadvantaged communities. In developing guidelines relative to this paragraph, the commission shall consider, but need not be limited to, the definition of disadvantaged communities as applied pursuant to subdivision (c).
(8)Cost-effectiveness, defined as maximizing the impact of the funds provided.
(9)The adoption by a city or county applicant of a bicycle transportation plan, pursuant to Section 891.2, a pedestrian plan, a safe routes to school plan, or an overall active transportation plan.
(10)Use of the California Conservation Corps or a qualified community conservation corps, as defined in Section 14507.5 of the Public Resources Code, as partners to undertake or construct applicable projects in accordance with Section 1524 of Public Law 112-141.
(11)Other factors, such as potential for reducing congestion, improving air quality, reducing greenhouse gas emissions, and increasing and improving connectivity and mobility of nonmotorized users. On and after January 1, 2026, increasing or improving connectivity of nonmotorized users shall not include the addition of a bikeway connecting to a Class III bikeway, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless the bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less or the project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(h)For the use of federal Transportation Alternative Program funds, or other federal funds, commission guidelines shall meet all applicable federal requirements.
(i)For the use of federal Highway Safety Improvement Program funds for active transportation projects specific to reducing fatalities and serious injuries, the criteria for the selection of projects shall be based on a data-driven process that is aligned with the states Strategic Highway Safety Plan.
(j)The guidelines may include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects.
(k)In reviewing and selecting projects funded by federal funds in the Recreational Trails Program, the commission shall collaborate with the Department of Parks and Recreation to evaluate proposed projects, and to ensure federal requirements are met.
(l)To ensure that regional agencies charged with allocating funds to projects pursuant to paragraph (1) of subdivision (a) of Section 2381 have sufficient discretion to develop regional guidelines, the commission may adopt separate guidelines for the state and for the regional agencies relative to subdivision (g).
(m)This section shall remain in effect only until January 1, 2028, and as of that date is repealed.
SEC. 3.Section 2382 is added to the Streets and Highways Code, to read:2382.(a)The California Transportation Commission shall develop guidelines and project selection criteria for the Active Transportation Program in consultation with the Active Transportation Program Workgroup, which shall be formed for purposes of providing guidance on matters, including, but not limited to, development of and subsequent revisions to program guidelines, schedules and procedures, project selection criteria, performance measures, and program evaluation. The workgroup shall include, but not be limited to, representatives of governmental agencies and active transportation stakeholder organizations with expertise in pedestrian and bicycle issues, including Safe Routes to School programs.
(b)The guidelines shall be the complete and full statement of the policies and criteria that the commission intends to use in selecting projects to be included in the program. The guidelines shall address subjects that include, but are not limited to, project eligibility, application timelines, application rating and ranking criteria, project monitoring, reporting, and transparency, and project performance measurement.
(c)The guidelines shall include a process to ensure that no less than 25 percent of overall program funds benefit disadvantaged communities during each program cycle. The guidelines shall establish a program definition for disadvantaged communities that may include, but need not be limited to, the definition in Section 39711 of the Health and Safety Code and the definition of low-income schools in paragraph (7) of subdivision (b) of former Section 2333.5, as that section read on January 1, 2013. A project eligible under this subdivision shall clearly demonstrate a benefit to a disadvantaged community or be directly located in a disadvantaged community.
(d)The guidelines shall allow streamlining of project delivery by authorizing an implementing agency to seek commission approval of a letter of no prejudice that will allow the agency to expend its own funds for a project programmed in a future year of the adopted program of projects, in advance of allocation of funds to the project by the commission, and to be reimbursed at a later time for eligible expenditures.
(e)The California Transportation Commission shall adopt the guidelines and selection criteria for, and define the types of projects eligible to be funded through, the program following at least two public hearings. Projects funded in this program shall be limited to active transportation projects. The guidelines shall ensure that eligible projects meet one or more of the goals set forth in Section 2380 and may give increased weight to projects meeting multiple goals.
(f)In developing the guidelines with regard to project eligibility, the commission shall include, but need not be limited to, the following project types:
(1)Development of new bikeways and walkways, or improvements to existing bikeways and walkways, that improve mobility, access, or safety for nonmotorized users. On and after January 1, 2026, the guidelines with regard to project eligibility shall not include the development of Class III bikeways, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless any of the following apply:
(A)The Class III bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less.
(B)The project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(C)The project applicant demonstrates that the use of the Class III bikeway or marking is appropriate for the local community context and advances a lower stress environment or a low-stress network.
(2)Secure bicycle parking at employment centers, park and ride lots, rail and transit stations, and ferry docks and landings.
(3)Bicycle-carrying facilities on public transit, including rail and ferries.
(4)Installation of traffic control devices to improve the safety of pedestrians and bicyclists.
(5)Elimination of hazardous conditions on existing bikeways and walkways.
(6)Maintenance of bikeways and walkways.
(7)Recreational trails and trailheads, park projects that facilitate trail linkages or connectivity to nonmotorized corridors, and conversion of abandoned railroad corridors to trails.
(8)Safe Routes to School projects that improve the safety of children walking and bicycling to school, in accordance with Section 1404 of Public Law 109-59.
(9)Safe routes to transit projects that encourage access to transit facilities and schoolbus stops by biking and walking, including, but not limited to, transit station areas, planned transit or schoolbus stops, transit corridors, transit-oriented development planning areas, and projects that will expand access to transit in underserved or rural areas.
(10)Educational programs to increase biking and walking, and other noninfrastructure investments that demonstrate effectiveness in increasing active transportation.
(g)In developing the guidelines with regard to project selection, the commission shall include, but need not be limited to, the following criteria:
(1)Demonstrated needs of the applicant.
(2)Potential for reducing pedestrian and bicyclist injuries and fatalities.
(3)Potential for encouraging increased walking and bicycling, especially among students.
(4)Identification of safety hazards for pedestrians and bicyclists.
(5)Identification of walking and bicycling routes to and from community centers, schools, transit stops, stations, and other transit facilities, including the potential for encouraging increased access to public transit.
(6)Identification of the local public participation process that culminated in the project proposal, which may include noticed public meetings and consultation with local stakeholders.
(7)Benefit to disadvantaged communities. In developing guidelines relative to this paragraph, the commission shall consider, but need not be limited to, the definition of disadvantaged communities as applied pursuant to subdivision (c).
(8)Cost-effectiveness, defined as maximizing the impact of the funds provided.
(9)The adoption by a city or county applicant of a bicycle transportation plan, pursuant to Section 891.2, a pedestrian plan, a safe routes to school plan, or an overall active transportation plan.
(10)Use of the California Conservation Corps or a qualified community conservation corps, as defined in Section 14507.5 of the Public Resources Code, as partners to undertake or construct applicable projects in accordance with Section 1524 of Public Law 112-141.
(11)Other factors, such as potential for reducing congestion, improving air quality, reducing greenhouse gas emissions, and increasing and improving connectivity and mobility of nonmotorized users. On and after January 1, 2026, increasing or improving connectivity of nonmotorized users shall not include the addition of a bikeway connecting to a Class III bikeway, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless the bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less or the project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(12)Recommendations to maximize commitments of state transportation improvement program funds to projects funded by the program in order to scale funding for larger or network-level active transportation improvements.
(h)For the use of federal Transportation Alternatives Program funds, or other federal funds, commission guidelines shall meet all applicable federal requirements.
(i)For the use of federal Highway Safety Improvement Program funds for active transportation projects specific to reducing fatalities and serious injuries, the criteria for the selection of projects shall be based on a data-driven process that is aligned with the states Strategic Highway Safety Plan.
(j)The guidelines shall include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects.
(k)The guidelines shall include a progressive range of penalties that range from a deduction of points to disqualification for an applicant that failed to use previously received program funds in a timely manner. In doing so, the commission shall consider factors that are not under the control of an applicant.
(l)In reviewing and selecting projects funded by federal funds in the Recreational Trails Program, the commission shall collaborate with the Department of Parks and Recreation to evaluate proposed projects, and to ensure federal requirements are met.
(m)To ensure that regional agencies charged with allocating funds to projects pursuant to paragraph (1) of subdivision (a) of Section 2381 have sufficient discretion to develop regional guidelines, the commission may adopt separate guidelines for the state and for the regional agencies relative to subdivision (g).
(n)This section shall become operative on January 1, 2028.
There is hereby established the Active Transportation Program in the department for the purpose of encouraging increased use of active modes of transportation, such as biking and walking. It is the intent of the Legislature that the program achieve all of the following goals:
(a)Increase the proportion of trips accomplished by biking and walking. walking, including, but not limited to, access to public transit stops, stations, and other transit facilities.
(b)Increase safety and mobility for nonmotorized users.
(c)Advance the active transportation efforts of regional agencies to achieve greenhouse gas reduction goals as established pursuant to Senate Bill 375 (Chapter 728, Statutes of 2008) and Senate Bill 391 (Chapter 585, Statutes of 2009).
(d)Enhance public health, including reduction of childhood obesity through the use of programs including, but not limited to, projects eligible for Safe Routes to School Program funding.
(e)Ensure that disadvantaged communities fully share in the benefits of the program.
(f)Provide a broad spectrum of projects to benefit many types of active transportation users.
(g)Increase walking and bicycling access to public transit stops, stations, and frequent transit corridors.SEC. 2.Section 2382 of the Streets and Highways Code is amended to read:2382.(a)The California Transportation Commission shall develop guidelines and project selection criteria for the Active Transportation Program in consultation with the Active Transportation Program Workgroup, which shall be formed for purposes of providing guidance on matters including, but not limited to, development of and subsequent revisions to program guidelines, schedules and procedures, project selection criteria, performance measures, and program evaluation. The workgroup shall include, but not be limited to, representatives of government agencies and active transportation stakeholder organizations with expertise in pedestrian and bicycle issues, including Safe Routes to School programs.
(b)The guidelines shall be the complete and full statement of the policies and criteria that the commission intends to use in selecting projects to be included in the program. The guidelines shall address subjects that include, but are not limited to, project eligibility, application timelines, application rating and ranking criteria, project monitoring, reporting, and transparency, and project performance measurement.
(c)The guidelines shall include a process to ensure that no less than 25 percent of overall program funds benefit disadvantaged communities during each program cycle. The guidelines shall establish a program definition for disadvantaged communities that may include, but need not be limited to, the definition in Section 39711 of the Health and Safety Code and the definition of low-income schools in paragraph (7) of subdivision (b) of former Section 2333.5, as that section read on January 1, 2013. A project eligible under this subdivision shall clearly demonstrate a benefit to a disadvantaged community or be directly located in a disadvantaged community.
(d)The guidelines shall allow streamlining of project delivery by authorizing an implementing agency to seek commission approval of a letter of no prejudice that will allow the agency to expend its own funds for a project programmed in a future year of the adopted program of projects, in advance of allocation of funds to the project by the commission, and to be reimbursed at a later time for eligible expenditures.
(e)The California Transportation Commission shall adopt the guidelines and selection criteria for, and define the types of projects eligible to be funded through, the program following at least two public hearings. Projects funded in this program shall be limited to active transportation projects. The guidelines shall ensure that eligible projects meet one or more of the goals set forth in Section 2380 and may give increased weight to projects meeting multiple goals.
(f)In developing the guidelines with regard to project eligibility, the commission shall include, but need not be limited to, the following project types:
(1)Development of new bikeways and walkways, or improvements to existing bikeways and walkways, that improve mobility, access, or safety for nonmotorized users. On and after January 1, 2026, the guidelines with regard to project eligibility shall not include the development of Class III bikeways, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless any of the following apply:
(A)The Class III bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less.
(B)The project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(C)The project applicant demonstrates that the use of the Class III bikeway or marking is appropriate for the local community context and advances a lower stress environment or a low-stress network.
(2)Secure bicycle parking at employment centers, park and ride lots, rail and transit stations, and ferry docks and landings.
(3)Bicycle-carrying facilities on public transit, including rail and ferries.
(4)Installation of traffic control devices to improve the safety of pedestrians and bicyclists.
(5)Elimination of hazardous conditions on existing bikeways and walkways.
(6)Maintenance of bikeways and walkways.
(7)Recreational trails and trailheads, park projects that facilitate trail linkages or connectivity to nonmotorized corridors, and conversion of abandoned railroad corridors to trails.
(8)Safe Routes to School projects that improve the safety of children walking and bicycling to school, in accordance with Section 1404 of Public Law 109-59.
(9)Safe routes to transit projects that encourage access to transit and investments in transit-rich and infill opportunity areas, facilities and schoolbus stops by biking and walking, including, but not limited to, transit station areas, major or planned transit or schoolbus stop walksheds, frequent stops, transit corridors, and identified infill or transit-oriented development planning areas, and projects that will expand access to transit in underserved or rural areas.
(10)Educational programs to increase biking and walking, and other noninfrastructure investments that demonstrate effectiveness in increasing active transportation.
(g)In developing the guidelines with regard to project selection, the commission shall include, but need not be limited to, the following criteria:
(1)Demonstrated needs of the applicant.
(2)Potential for reducing pedestrian and bicyclist injuries and fatalities.
(3)Potential for encouraging increased walking and bicycling, especially among students.
(4)Potential for encouraging increased access to public transit.(5)(4)Identification of safety hazards for pedestrians and bicyclists.
(6)(5)Identification of walking and bicycling routes to and from community centers, schools, transit stops and stops, stations, and community centers. and other transit facilities, including the potential for encouraging increased access to public transit.
(7)(6)Identification of the local public participation process that culminated in the project proposal, which may include noticed public meetings and consultation with local stakeholders.
(8)(7)Benefit to disadvantaged communities. In developing guidelines relative to this paragraph, the commission shall consider, but need not be limited to, the definition of disadvantaged communities as applied pursuant to subdivision (c).
(9)(8)Cost-effectiveness, defined as maximizing the impact of the funds provided.
(10)(9)The adoption by a city or county applicant of a bicycle transportation plan, pursuant to Section 891.2, a pedestrian plan, a safe routes to school plan, or an overall active transportation plan.
(11)(10)Use of the California Conservation Corps or a qualified community conservation corps, as defined in Section 14507.5 of the Public Resources Code, as partners to undertake or construct applicable projects in accordance with Section 1524 of Public Law 112-141.
(12)(11)Other factors, such as potential for reducing congestion, improving air quality, reducing greenhouse gas emissions, and increasing and improving connectivity and mobility of nonmotorized users. On and after January 1, 2026, increasing or improving connectivity of nonmotorized users shall not include the addition of a bikeway connecting to a Class III bikeway, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless the bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less or the project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(13)(12)Recommendations to maximize commitments of state transportation improvement program funds to projects funded by the program in order to scale funding for larger or network-level active transportation improvements. Higher priority shall be given to projects that allocate 50 percent or more of state transportation improvement program programming capacity to active transportation improvements, especially those projects that advance safe routes to school and safe routes to transit.
(h)For the use of federal Transportation Alternative Program funds, or other federal funds, commission guidelines shall meet all applicable federal requirements.
(i)For the use of federal Highway Safety Improvement Program funds for active transportation projects specific to reducing fatalities and serious injuries, the criteria for the selection of projects shall be based on a data-driven process that is aligned with the states Strategic Highway Safety Plan.
(j)The guidelines shall include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects.
(k)The guidelines shall include a progressive range of penalties that range from a deduction of points to disqualification for an applicant that failed to use previously received program funds in a timely manner. In doing so, the commission shall consider factors that are not under the control of an applicant.
(l)In reviewing and selecting projects funded by federal funds in the Recreational Trails Program, the commission shall collaborate with the Department of Parks and Recreation to evaluate proposed projects, and to ensure federal requirements are met.
(m)To ensure that regional agencies charged with allocating funds to projects pursuant to paragraph (1) of subdivision (a) of Section 2381 have sufficient discretion to develop regional guidelines, the commission may adopt separate guidelines for the state and for the regional agencies relative to subdivision (g).
There is hereby established the Active Transportation Program in the department for the purpose of encouraging increased use of active modes of transportation, such as biking and walking. It is the intent of the Legislature that the program achieve all of the following goals:
(a)Increase the proportion of trips accomplished by biking and walking.
(b)Increase safety and mobility for nonmotorized users.
(c)Advance the active transportation efforts of regional agencies to achieve greenhouse gas reduction goals as established pursuant to Senate Bill 375 (Chapter 728, Statutes of 2008) and Senate Bill 391 (Chapter 585, Statutes of 2009).
(d)Enhance public health, including reduction of childhood obesity through the use of programs including, but not limited to, projects eligible for Safe Routes to School Program funding.
(e)Ensure that disadvantaged communities fully share in the benefits of the program.
(f)Provide a broad spectrum of projects to benefit many types of active transportation users.
(g)Increase walking and bicycling access to public transit stops, stations, and frequent transit corridors.
SEC. 2.Section 2382 of the Streets and Highways Code is amended to read:2382.(a)The California Transportation Commission shall develop guidelines and project selection criteria for the Active Transportation Program in consultation with the Active Transportation Program Workgroup, which shall be formed for purposes of providing guidance on matters including, but not limited to, development of and subsequent revisions to program guidelines, schedules and procedures, project selection criteria, performance measures, and program evaluation. The workgroup shall include, but not be limited to, representatives of government agencies and active transportation stakeholder organizations with expertise in pedestrian and bicycle issues, including Safe Routes to School programs.
(b)The guidelines shall be the complete and full statement of the policies and criteria that the commission intends to use in selecting projects to be included in the program. The guidelines shall address subjects that include, but are not limited to, project eligibility, application timelines, application rating and ranking criteria, project monitoring, reporting, and transparency, and project performance measurement.
(c)The guidelines shall include a process to ensure that no less than 25 percent of overall program funds benefit disadvantaged communities during each program cycle. The guidelines shall establish a program definition for disadvantaged communities that may include, but need not be limited to, the definition in Section 39711 of the Health and Safety Code and the definition of low-income schools in paragraph (7) of subdivision (b) of former Section 2333.5, as that section read on January 1, 2013. A project eligible under this subdivision shall clearly demonstrate a benefit to a disadvantaged community or be directly located in a disadvantaged community.
(d)The guidelines shall allow streamlining of project delivery by authorizing an implementing agency to seek commission approval of a letter of no prejudice that will allow the agency to expend its own funds for a project programmed in a future year of the adopted program of projects, in advance of allocation of funds to the project by the commission, and to be reimbursed at a later time for eligible expenditures.
(e)The California Transportation Commission shall adopt the guidelines and selection criteria for, and define the types of projects eligible to be funded through, the program following at least two public hearings. Projects funded in this program shall be limited to active transportation projects. The guidelines shall ensure that eligible projects meet one or more of the goals set forth in Section 2380 and may give increased weight to projects meeting multiple goals.
(f)In developing the guidelines with regard to project eligibility, the commission shall include, but need not be limited to, the following project types:
(1)Development of new bikeways and walkways, or improvements to existing bikeways and walkways, that improve mobility, access, or safety for nonmotorized users. On and after January 1, 2026, the guidelines with regard to project eligibility shall not include the development of Class III bikeways, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless any of the following apply:
(A)The Class III bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less.
(B)The project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(C)The project applicant demonstrates that the use of the Class III bikeway or marking is appropriate for the local community context and advances a lower stress environment or a low-stress network.
(2)Secure bicycle parking at employment centers, park and ride lots, rail and transit stations, and ferry docks and landings.
(3)Bicycle-carrying facilities on public transit, including rail and ferries.
(4)Installation of traffic control devices to improve the safety of pedestrians and bicyclists.
(5)Elimination of hazardous conditions on existing bikeways and walkways.
(6)Maintenance of bikeways and walkways.
(7)Recreational trails and trailheads, park projects that facilitate trail linkages or connectivity to nonmotorized corridors, and conversion of abandoned railroad corridors to trails.
(8)Safe Routes to School projects that improve the safety of children walking and bicycling to school, in accordance with Section 1404 of Public Law 109-59.
(9)Safe routes to transit projects, which will encourage transit by improving biking and walking routes to mass transportation facilities and schoolbus stops. projects that encourage access to transit and investments in transit-rich and infill opportunity areas, including, but not limited to, station areas, major or planned transit or schoolbus stop walksheds, frequent transit corridors, and identified infill or transit-oriented development planning areas.
(10)Educational programs to increase biking and walking, and other noninfrastructure investments that demonstrate effectiveness in increasing active transportation.
(g)In developing the guidelines with regard to project selection, the commission shall include, but need not be limited to, the following criteria:
(1)Demonstrated needs of the applicant.
(2)Potential for reducing pedestrian and bicyclist injuries and fatalities.
(3)Potential for encouraging increased walking and bicycling, especially among students.
(4)Potential for encouraging increased access to public transit.
(4)(5)Identification of safety hazards for pedestrians and bicyclists.
(5)(6)Identification of walking and bicycling routes to and from schools, transit facilities, stops and stations, and community centers.
(6)(7)Identification of the local public participation process that culminated in the project proposal, which may include noticed public meetings and consultation with local stakeholders.
(7)(8)Benefit to disadvantaged communities. In developing guidelines relative to this paragraph, the commission shall consider, but need not be limited to, the definition of disadvantaged communities as applied pursuant to subdivision (c).
(8)(9)Cost-effectiveness, defined as maximizing the impact of the funds provided.
(9)(10)The adoption by a city or county applicant of a bicycle transportation plan, pursuant to Section 891.2, a pedestrian plan, a safe routes to school plan, or an overall active transportation plan.
(10)(11)Use of the California Conservation Corps or a qualified community conservation corps, as defined in Section 14507.5 of the Public Resources Code, as partners to undertake or construct applicable projects in accordance with Section 1524 of Public Law 112-141.
(11)(12)Other factors, such as potential for reducing congestion, improving air quality, reducing greenhouse gas emissions, and increasing and improving connectivity and mobility of nonmotorized users. On and after January 1, 2026, increasing or improving connectivity of nonmotorized users shall not include the addition of a bikeway connecting to a Class III bikeway, as described in Section 890.4, or the marking in Figure 9C-9 of the 2014 California Manual on Uniform Traffic Control Devices, Revision 8, unless the bikeway or marking is on a highway with a design speed limit of 25 miles per hour or less or the project will implement improvements to reduce the design speed limit to 25 miles per hour or less.
(13)Recommendations to maximize commitments of state transportation improvement program funds to projects funded by the program in order to scale funding for larger or network-level active transportation improvements. Higher priority shall be given to projects that allocate 50 percent or more of state transportation improvement program programming capacity to active transportation improvements, especially those projects that advance safe routes to school and safe routes to transit.
(h)For the use of federal Transportation Alternative Program funds, or other federal funds, commission guidelines shall meet all applicable federal requirements.
(i)For the use of federal Highway Safety Improvement Program funds for active transportation projects specific to reducing fatalities and serious injuries, the criteria for the selection of projects shall be based on a data-driven process that is aligned with the states Strategic Highway Safety Plan.
(j)The guidelines may shall include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects.
(k)The guidelines shall include a progressive range of penalties that range from a deduction of points to disqualification for an applicant that failed to use previously received program funds in a timely manner.
(k)(l)In reviewing and selecting projects funded by federal funds in the Recreational Trails Program, the commission shall collaborate with the Department of Parks and Recreation to evaluate proposed projects, and to ensure federal requirements are met.
(l)(m)To ensure that regional agencies charged with allocating funds to projects pursuant to paragraph (1) of subdivision (a) of Section 2381 have sufficient discretion to develop regional guidelines, the commission may adopt separate guidelines for the state and for the regional agencies relative to subdivision (g).
SECTION 1.Section 11000 of the Streets and Highways Code is amended to read:11000.This part shall be known, and may be cited, as the Pedestrian Mall Law of 1960.This part shall be known, and may be cited cited, as the Pedestrian Mall Law of 1960.
|
Date
|
Status
|
|---|---|
| Sep 15, 2026 | Chaptered by Secretary of State - Chapter 210, Statutes of 2026. |
| Sep 15, 2026 | Approved by the Governor. |
| Sep 14, 2026 | Chaptered by Secretary of State - Chapter 210, Statutes of 2026. |
| Sep 14, 2026 | Approved by the Governor. |
| Sep 4, 2026 | Enrolled and presented to the Governor at 4 p.m. |
| Aug 27, 2026 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 58. Noes 19. Page 6748.). |
| Aug 27, 2026 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 58. Noes 19.). |
| Aug 25, 2026 | In Assembly. Concurrence in Senate amendments pending. |
| Aug 25, 2026 | Read third time. Passed. Ordered to the Assembly. (Ayes 29. Noes 10. Page 5734.). |
| Aug 25, 2026 | Read third time. Passed. Ordered to the Assembly. (Ayes 28. Noes 10.). |
| Aug 4, 2026 | Read second time. Ordered to third reading. |
| Aug 3, 2026 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| Jul 1, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 8. Noes 4.) (June 30). Re-referred to Com. on APPR. |
| Jun 22, 2026 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on TRANS. |
| Jun 10, 2026 | Referred to Com. on TRANS. |
| Jun 1, 2026 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 28, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 58. Noes 20. Page 5537.) |
| May 28, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 58. Noes 20.) |
| May 19, 2026 | Read second time. Ordered to third reading. |
| May 18, 2026 | Read second time and amended. Ordered returned to second reading. |
| May 14, 2026 | From committee: Amend, and do pass as amended. (Ayes 11. Noes 4.) (May 14). |
| May 6, 2026 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| Apr 21, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 11. Noes 4.) (April 20). Re-referred to Com. on APPR. |
| Apr 14, 2026 | Re-referred to Com. on TRANS. |
| Apr 13, 2026 | From committee chair, with author's amendments: Amend, and re-refer to Com. on TRANS. Read second time and amended. |
| Mar 17, 2026 | Re-referred to Com. on TRANS. |
| Mar 16, 2026 | From committee chair, with author's amendments: Amend, and re-refer to Com. on TRANS. Read second time and amended. |
| Mar 16, 2026 | Referred to Com. on TRANS. |
| Feb 19, 2026 | From printer. May be heard in committee March 21. |
| Feb 18, 2026 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 27, 2026 | AB 2168 Wicks Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Aug 25, 2026 | Assembly 3rd Reading AB2168 Wicks By Blakespear | Senate Floor |
Passed |
|
| Jun 30, 2026 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Transportation |
Passed |
|
| May 28, 2026 | AB 2168 Wicks Assembly Third Reading | Assembly Floor |
Passed |
|
| May 14, 2026 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 20, 2026 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Transportation |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 350 Bay Area Action | ** Support | |
| 350 Sacramento | ** Support | |
| Activesgv | ** Support | |
| Alameda-Contra Costa Transit District | ** Support | |
| Albany Strollers & Rollers | ** Support | |
| Big City Mayors | ** Support | |
| Bike Coalition San Diego County | ** Support | |
| Bike Concord | ** Support | |
| Bike East Bay | ** Support | |
| Bike LA | ** Support | |
| Bike Monterey | ** Support | |
| Bike Walk Alameda | ** Support | |
| Bikewalkcv (castro Valley) | ** Support | |
| Bike Walnut Creek | ** Support | |
| California Bicycle Coalition | ** Support | |
| California Big City Mayors Coalition | ** Support | |
| California Teachers Association | ** Support | |
| Center for Community Action and Environmental Justice | ** Support | |
| Chico Velo | ** Support | |
| cleanearth4kids.org | ** Support | |
| Climate Plan | ** Support | |
| Coalition For Clean Air | ** Support | |
| County of Shasta | ** Against | |
| Ecology Action | ** Support | |
| El Cerrito Richmond Annex Walk & Roll | ** Support | |
| Inland Empire Biking Alliance | ** Support | |
| Los Angeles Critical Mass | ** Support | |
| Marin County Bicycle Coalition | ** Support | |
| Monterey-Salinas Transit | ** Support | |
| Monterey-Salinas Transit District (if amended) | ** Support | |
| Monterey-Salinas Transit (MST) | ** Support | |
| Move LA | ** Support | |
| Move Santa Barbara County | ** Support | |
| Napa County Bicycle Coalition | ** Support | |
| Nevada County Transportation Commission | ** Against | |
| NRDC | ** Support | |
| One individual | ** Support | |
| People for Bikes | ** Support | |
| Riverside County Transportation Commission | ** Against | |
| Sacramento Area Bicycle Advocates | ** Support | |
| San Diego 350 | ** Support | |
| San Francisco Bicycle Coalition | ** Support | |
| Santa Monica Safe Streets Alliance | ** Support | |
| Santa Monica Spoke | ** Support | |
| Shasta Living Streets | ** Support | |
| Silicon Valley Bicycle Coalition | ** Support | |
| Slow Down Sacramento | ** Support | |
| Streets for All | ** Support | |
| Streets Forward | ** Support | |
| Sunnyvale Safe Streets | ** Support | |
| Transbay Coalition | ** Support | |
| Transform | ** Support | |
| Vibrant Lafayette | ** Support | |
| Walk Bike Berkeley | ** Support | |
| Zerow.org | ** Support |
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 2168
Author:(Wicks)
As Amended Ver:June 22, 2026
Majority vote
SUMMARY
Expands the types of projects eligible for Active Transportation Program (ATP) funding to include projects that provide access to transit and requires the California Transportation Commission (CTC), on or after January 1, 2028, to include in its ATP guidelines penalties for failure to use ATP funds in a timely manner.
Senate Amendments
- Remove the requirement that the CTC consider in its development of ATP guidelines recommendations to maximize commitments of state transportation improvement program funds to projects funded by the program in order to scale funding for larger or network-level active transportation improvements.
- Clarify that attracting funds other than program funds is for the purpose of scaling funding for larger or network-level active transportation improvements.
- Add that the guidelines shall include a requirement that an applicant consult with the executive officer of a transit agency operating in a project corridor if the project will be adjacent to an existing bus, shuttle, or paratransit route. The consultation should provide project information, expected impact on the transit route, and a statement that the applicant will continue consulting with the transit agency should the grant be awarded.
COMMENTS
Evolution of Safe Routes to Schools to ATP. SB 99 (Committee on Budget), Chapter 359, Statutes of 2013 created the ATP, which represents an amalgamation of historically small, dedicated grant programs for Safe Routes to Schools (SRTS), bicycle programs, and recreational trails. The concept of SRTS was indirectly inspired by a 1973 federal law making grants to states to increase bicycle and pedestrian safety. This provided the foundation, many years later, for Congress to pass the federal SRTS program in 2005 with the goal of improving the ability of primary and middle school students to safely walk and bicycle to school.
ATP is chronically over-subscribed. Today, the ATP is a competitive grant program funded by state and federal sources at approximately $123 million annually and while continuing to support SRTS projects it has evolved to fund bike paths, safe routes to transit, other non-motorized forms of transport (e.g., scooters, wheelchairs), development of relevant planning documents, and education and "encouragement" activities. It is a highly popular program—according to the CTC, in its 7th and most recent cycle (2025), one of the most competitive since inception, it received 277 project applications requesting $2.5 billion in funds, about 15 times the $169 million that was available. Half of total funding is reserved for statewide projects, 40% is reserved for projects within the boundaries of Metropolitan Planning Organizations in urban areas with populations greater than 200,000, and the remaining 10% is dedicated for small urban/rural regions with populations less than 200,000.
According to the CTC, "The Active Transportation Program continues to face significant unmet demand, as communities across the state look to the program to fund critical active transportation projects needed to meet California's safety, climate, and equity goals. Sustained and additional funding is needed to fund the hundreds of critically needed high-quality projects that remain unfunded each cycle." Through the 6th cycle, 1,148 projects have been programmed (i.e., funding approved) and 551 or 48% of projects have been completed.
The CTC already incentivizes and rewards transit access projects. This bill requires the CTC, when developing ATP project eligibility and selection guidelines, to include as a new criterion the potential for encouraging increased access to public transit. This bill does not define "transit access" but the sponsors have described it as extending a bike or pedestrian trip or connecting transportation networks like a bike path to a transit facility. According to the author:
Current ATP statute and guidelines do not adequately prioritize the locations where active transportation investments generate the greatest return on investment. Specifically, the program's existing definition of "safe routes to transit" fails to specify the broader landscape of transit-supportive geography—station areas, frequent transit corridors, transit stop walksheds, and infill—where active transportation improvements can most effectively connect people to transit and reduce vehicle miles traveled (VMT).
It is unclear if this bill would result in outcomes substantially different than the status quo. Program guidelines and scoring criteria that the CTC has established already incentivize applicants to consider project "need in the context of connectivity to key destinations including connections to transit, mobility to access everyday needs and services, and local public health concerns" and the CTC awards the greatest number of points (up to 38 out of 100) to this criterion. Projects facilitating improved transit connections, for example, already score higher today and an applicant can earn additional points for projects that transform a "non-motorized environment" or supporting existing or planned housing (especially affordable housing).
In fact, in the most recent round of ATP projects under consideration, the CTC awarded funding for 13 projects, 11 of which provide some connection to transit facilities such as public/school buses or light rail.
Nonetheless, it is reasonable to update ATP goals and guidelines to clarify eligibility of a wider scope of transit access projects and to modernize the program's statute to recognize the benefits of, for example, connecting a bike pathway to a transit facility. At the same time, the CTC should not give undue advantage to certain types of projects more commonly found in urban areas to avoid inadvertently disadvantaging less urban or rural regions of the state without the population density to support extensive public transit networks.
Finally, despite "transit access" projects being already eligible for higher scoring, there are other criteria, pursuant to ATP's statutory goals, that the CTC is obligated to consider providing access to everyday needs and services by walking or bicycling for persons of all ages and disabilities—not just commuters or transit users—or local public health concerns (e.g., childhood obesity). In fact, among other statutory goals, the CTC is mandated to consider "a broad spectrum of projects to benefit many types of active transportation users". This succinctly captures the CTC's delicate balancing act when considering six statutory goals and a minimum of ten eligible project types, also dictated by statute, particularly for a significantly over-subscribed program.
According to the Author
"AB 2168 makes targeted, commonsense improvements to ensure California's Active Transportation Program (ATP) funds are spent effectively and efficiently. The legislation modernizes the definition of safe routes to transit, shifting focus toward transit-rich corridors, infill opportunity areas, and station walksheds — places where active transportation investments provide the deepest community benefits, giving people the option to not drive at all. It adds transit access as an explicit project selection criterion, aligning ATP priorities with California's broader climate and housing goals. It rewards applicants who leverage State Transportation Improvement Program (STIP) funds to active transportation. And it establishes a clear penalty structure for grantees who fail to spend funds on time, ensuring that awarded dollars move from paper to pavement without delay. Taken together, AB 2168's reforms sharpen the program's focus, reward strategic investment, and hold awardees accountable".
Arguments in Support
California Bicycle Coalition states: "AB 2168 makes critical updates to ensure that ATP investments more effectively increase access to public transit, particularly in transit-rich and infill areas. By prioritizing projects that improve walking and bicycling connections to transit, this bill helps reduce greenhouse gas emissions, supports California's climate goals, and promotes healthier, more sustainable communities. Additionally, the bill enhances accountability by introducing clearer expectations and potential consequences for projects that do not use awarded funds in a timely manner. This ensures that limited transportation dollars are used efficiently and that high-impact projects are delivered without unnecessary delays."
Arguments in Opposition
Nevada County Transportation Commission is opposed unless amended to the bill and has requested clarifying amendments to the provision requiring the CTC to include in its guidelines incentives to attract matching or outside funding.
FISCAL COMMENTS
According to the Assembly Appropriations Committee:
Minor costs to CTC.
To the extent the bill leads to projects not receiving ATP funding that would have received such funding, absent the bill, the bill creates cost pressure to provide additional monies to fund those projects, too (General Fund or special funds).
VOTES:
ASM TRANSPORTATION: 11-4-1
YES: Wilson, Aguiar-Curry, Ahrens, Carrillo, Harabedian, Hart, Jackson, Papan, Ransom, Rogers, Sharp-Collins
NO: Davies, Hoover, Lackey, Macedo
ABS, ABST OR NV: Ávila Farías
ASM APPROPRIATIONS: 11-4-0
YES: Wicks, Aguiar-Curry, Calderon, Caloza, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache
NO: Hoover, Dixon, Ta, Tangipa
ASSEMBLY FLOOR: 58-20-2
YES: Addis, Aguiar-Curry, Ahrens, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Connolly, Elhawary, Fong, Gabriel, Garcia, Gipson, Mark González, Haney, Harabedian, Hart, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Pellerin, Petrie-Norris, Ramos, Ransom, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Valencia, Ward, Wicks, Wilson, Zbur, Rivas
NO: Alanis, Castillo, Chen, Davies, DeMaio, Dixon, Ellis, Flora, Gallagher, Jeff Gonzalez, Hadwick, Hoover, Johnson, Lackey, Macedo, Patterson, Sanchez, Ta, Tangipa, Wallis
ABS, ABST OR NV: Quirk-Silva, Celeste Rodriguez
UPDATED
VERSION: June 22, 2026
CONSULTANT: Dan Chia / TRANS. / (916) 319-2093 FN: 0004135
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | AB 2168 |
THIRD READING
Bill No: AB 2168
Author: Wicks (D)
Amended: 6/22/26 in Senate
Vote: 21
SENATE TRANSPORTATION COMMITTEE: 8-4, 6/30/26
AYES: Cortese, Archuleta, Arreguín, Blakespear, Grayson, Menjivar, Richardson, Wiener
NOES: Strickland, Dahle, Seyarto, Valladares
NO VOTE RECORDED: Gonzalez
ASSEMBLY FLOOR: 58-20, 5/28/26 - See last page for vote
SUBJECT: Active Transportation Program: guidelines
SOURCE: Author
DIGEST:
This bill directs the California Transportation Commission (CTC) to establish penalties for failure to use Active Transportation Program (ATP) funds in a timely manner, clarifies ATP eligibility criteria related to projects that provide access to transit, and expands the goals of ATP to include increasing the proportion of trips accomplished by accessing public transit.
ANALYSIS:
Existing law:
- Establishes ATP within the California Department of Transportation (Caltrans) to encourage increased use of active modes of transportation, such as biking and walking, expresses the intent of the Legislature that the program achieves all of the following goals:
- Increase the proportion of trips accomplished by biking and walking.
- Increase safety and mobility for nonmotorized users.
- Advance the active transportation efforts of regional agencies to achieve greenhouse gas reduction goals pursuant to Senate Bill 375 (Steinberg, Chapter 728, Statutes of 2008) and Senate Bill 391 (Liu, Chapter 585, Statutes of 2009).
- Enhance public health, including reduction of childhood obesity through the use of programs including, but not limited to, projects eligible for Safe Routes to School Program funding.
- Ensure that disadvantaged communities fully share in the benefits of the program.
- Provide a broad spectrum of projects to benefit many types of active transportation users. (Streets and Highways (SHC) §2380)
- Requires CTC to ensure that eligible projects meet one or more of the above goals and authorizes it to give increased weight to projects meeting multiple goals. (SHC §2382)
- Requires CTC to develop ATP guidelines and project selection criteria in consultation with an ATP Workgroup; the guidelines must include topics like project eligibility, application timelines, application rating and ranking criteria, project monitoring, reporting, and transparency, and project performance measurement. (SHC §2382)
- Requires the guidelines to ensure that no less than 25% of overall program funds benefit disadvantaged communities during each program cycle. (SHC §2382)
- Requires CTC to include, but not be limited by, the following project types in its project eligibility guidelines:
- Development of new bikeways and walkways, or improvements to existing bikeways and walkways, that improve mobility, access, or safety for nonmotorized users.
- Secure bicycle parking at employment centers, park and ride lots, rail and transit stations, and ferry docks and landings.
- Bicycle-carrying facilities on public transit, including rail and ferries.
- Installation of traffic control devices to improve the safety of pedestrians and bicyclists.
- Elimination of hazardous conditions on existing bikeways and walkways.
- Maintenance of bikeways and walkways.
- Recreational trails and trailheads, park projects that facilitate trail linkages or connectivity to nonmotorized corridors, and conversion of abandoned railroad corridors to trails.
- Safe Routes to School projects that improve the safety of children walking and bicycling to school.
- Safe routes to transit projects, which encourage transit by improving biking and walking routes to mass transportation facilities and school bus stops.
- Educational programs to increase biking and walking, and other noninfrastructure investments that demonstrate effectiveness in increasing active transportation. (SHC §2382)
- Requires CTC to include, but not be limited by, the following criteria in project selection guidelines:
- Demonstrated needs of the applicant.
- Potential for reducing pedestrian and bicyclist injuries and fatalities.
- Potential for encouraging increased walking and bicycling, especially among students.
- Potential for encouraging increased access to public transit.
- Identification of safety hazards for pedestrians and bicyclists.
- Identification of walking and bicycling routes to and from schools, transit facilities, stops and stations, and community centers.
- Identification of the local public participation process that culminated in the project proposal, which may include noticed public meetings and consultation with local stakeholders.
- Benefits to disadvantaged communities.
- Cost-effectiveness, defined as maximizing the impact of the funds provided.
- The adoption by a city or county applicant of a bicycle transportation plan, a pedestrian plan, a safe routes to school plan, or an overall active transportation plan.
- Use of the California Conservation Corps or a qualified community conservation corps as construction partners.
- Other factors, such as potential for reducing congestion, improving air quality, reducing greenhouse gas emissions, and increasing and improving connectivity and mobility of nonmotorized users.
This bill:
- Expands the goals of ATP to include increasing the proportion of trips accomplished by accessing public transit stops, stations, and other transit facilities.
- On or after January 1, 2028, this bill:
- For the purposes of the development of ATP project eligibility guidelines, revises and expands the definition of “safe routes to transit,” to include projects that encourage access to transit station areas, planned transit or school bus stops, transit corridors, and transit-oriented development planning areas, and projects that will expand access to transit in underserved or rural areas.
- Adds the potential for encouraging increased access to public transit to the project selection criteria CTC must consider in the development of ATP guidelines.
- Requires, instead of authorizes, ATP guidelines to include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects in order to scale funding for larger or network level active transportation improvements.
- Requires ATP project selection guidelines to include a progressive range of penalties that range from a deduction of points to disqualification for an ATP applicant that failed to use previously received program funds in a timely manner. Specifies that CTC must take into consideration factors that are not under the control of an applicant and may impose no penalties or delayed penalties.
- Specifies that ATP project selection guidelines must include a requirement that an applicant consult the executive officer of the transit agency operating in the project corridor if the project will be adjacent to an existing bus, shuttle, or paratransit route. The consultation must provide project information, expected impact on the transit route, and a statement that the applicant will continue consultation with the transit agency should the grant be awarded.
Comments
- Purpose of the bill. According to the author, “AB 2168 makes a series of modest, commonsense improvements to ensure California's Active Transportation Program funds are spent effectively and efficiently. It modernizes the definition of safe routes to transit, shifting focus toward transit-rich corridors, infill opportunity areas, station walksheds, and underserved or rural areas — places where active transportation investments provide the deepest community benefits, giving people the option to potentially not drive at all. It adds transit access as an explicit project selection criterion, aligning with California's broader climate and housing goals. It directs the state to provide recommendations to maximize complimentary commitments of state transportation improvement program (STIP) funds to scale funding for larger or network-level active transportation improvements. And it establishes a graduated penalty structure for grantees who fail to spend funds on time, helping ensure that awarded dollars move from paper to pavement without delay.”
- ATP Background. The Active Transportation Program was created by SB 99 (Senate Committee on Budget and Fiscal Review, Chapter 359, Statutes of 2013) to encourage increased use of active modes of transportation. Administered by CTC, the goals of ATP include increasing the proportion of trips accomplished by walking and biking, increasing the safety and mobility of non-motorized users, advancing efforts of regional agencies to achieve greenhouse gas reduction goals, enhancing public health, and providing a broad spectrum of projects to benefit many types of users including disadvantaged communities. In 2017, the Legislature passed and the Governor signed SB 1 (Beall, Chapter 5, Statutes of 2017) which directed $100 million annually from the Road Maintenance and Rehabilitation Account to ATP, significantly augmenting the available funding for this popular program.
- ATP is highly competitive. CTC has programmed $3.9 billion to over 1,200 ATP projects statewide over the course of seven programming cycles.
However, ATP remains significantly oversubscribed as the demand for active transportation projects far outpaces the available funds. The 2025 ATP had a funding capacity of $168.7 million, one of the lowest in the history of the program, and funded nine projects in its statewide component, compared to 67 projects funded in the previous cycle. This was due to the $400 million reduction to the program in the 2024-25 State Budget. CTC received 277 applications requesting $2.5 billion for projects valued at $4.1 billion, almost 15 times greater than the 2025 Program’s funding capacity.[1]
- Funding safe routes to transit. AB 2168 makes numerous changes to ATP statute to promote projects with links to transit. Among these changes, this bill adds increasing access to public transit stops, stations, and other transit facilities to the overarching goals of ATP. Although transit access is not specifically listed in ATP’s current overarching goals, safe routes to transit projects are currently eligible for ATP funding. These projects encourage transit by improving biking and walking routes to mass transportation facilities and school bus stops. This bill modifies the definition of safe routes to transit to include planned transit or school bus stops, transit corridors, transit-oriented development planning areas, and projects that will expand access to transit in underserved or rural areas. CTC currently considers ATP applicants’ connectivity to key destinations, including connections to transit. AB 2168 clarifies this existing requirement by adding additional specificity related to transit stops, stations, and access. It is not clear to what extent the modifications will actually change which projects are eligible, and eventually selected, for ATP funding.
- Penalties for delayed projects. In response to concerns that a small number of recipients of ATP funding have not used the funds in a timely manner, this bill directs CTC to develop a progressive range of penalties to penalize recipients for these delays. The penalties would need to range from a deduction of points to disqualification for an applicant. CTC must consider factors that are not under the control of an applicant and would have the flexibility to choose not to impose penalties if appropriate.
This provision builds off CTC’s current practice. The Commission currently monitors projects funded through ATP to track the progress of project delivery. CTC expects certain deadlines to be met as programmed projects are implemented. If the expected deadlines are not met and a time extension is not approved prior to the expiration of a deadline, ATP funds will lapse, and the project or project phase will be deleted from ATP. Lapsed funds are returned to ATP for use in future cycles. For example, construction contracts must be awarded within six months of an approved allocation. CTC grants extensions for a range of circumstances that could delay a project, such as wildfires.[2]
Writing in support, the California Big City Mayors Coalition states, “[t]he coalition also supports the bill’s accountability provisions, which create clearer expectations and potential consequences for projects that do not use awarded funds in a timely manner. These provisions help ensure limited and competitive transportation dollars are used efficiently and that high-impact projects are delivered without unnecessary delays.”
- Other changes to ATP. AB 2168 makes additional, largely clarifying, changes to ATP’s eligibility criteria and project selection guidelines. Among these changes, this bill seeks to reward applicants that use other sources of funding to scale funding for larger or network level active transportation improvements. Currently, CTC can (and does) incentivize applicants to maximize ATP funding by utilizing funding from other sources for the projects, too. This bill requires CTC to continue this practice. This bill also includes requirements that a project applicant consult the executive officer of the transit agency operating in the project corridor if the project will be adjacent to an existing bus, shuttle, or paratransit route.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
SUPPORT: (Verified 8/3/26)
350 Bay Area Action
350 Sacramento
Activesgv
Alameda-contra Costa Transit District
Albany Strollers & Rollers
Big City Mayors
Bike Coalition San Diego County
Bike Concord
Bike East Bay
Bike LA
Bike Monterey
Bike Walk Alameda
Bike Walnut Creek
Bikewalkcv (Castro Valley)
California Bicycle Coalition
California Big City Mayors Coalition
California Teachers Association
Center for Community Action and Environmental Justice
Chico Velo
Cleanearth4kids.org
Climate Plan
Coalition for Clean Air
Ecology Action
El Cerrito Richmond Annex Walk & Roll
Inland Empire Biking Alliance
Los Angeles Critical Mass
Marin County Bicycle Coalition
Monterey-Salinas Transit
Move LA
Move Santa Barbara County
Napa County Bicycle Coalition
Nrdc
People for Bikes
Sacramento Area Bicycle Advocates
San Diego 350
San Francisco Bicycle Coalition
Santa Monica Safe Streets Alliance
Santa Monica Spoke
Shasta Living Streets
Silicon Valley Bicycle Coalition
Slow Down Sacramento
Streets for All
Streets Forward
Sunnyvale Safe Streets
Transbay Coalition
Transform
Vibrant Lafayette
Walk Bike Berkeley
Zerow.org
OPPOSITION: (Verified 8/3/26)
County of Shasta
ARGUMENTS IN SUPPORT: According to the California Bicycle Coalition, “AB 2168 makes critical updates to ensure that ATP investments more effectively increase access to public transit, particularly in transit-rich and infill areas. By prioritizing projects that improve walking and bicycling connections to transit, this bill helps reduce greenhouse gas emissions, supports California’s climate goals, and promotes healthier, more sustainable communities.
“Additionally, the bill enhances accountability by introducing clearer expectations and potential consequences for projects that do not use awarded funds in a timely manner. This ensures that limited transportation dollars are used efficiently and that high-impact projects are delivered without unnecessary delays.”
ARGUMENTS IN OPPOSITION: According to Shasta County, “The bill’s requirement for the California Transportation Commission to impose a progressive range pf penalties on applicants who fail to use previously awarded ATP funds in a timely manner also presents a substantial challenge for rural jurisdictions. Delays in project delivery often arise from outside factors, including right-of-way constraints, environmental review timelines, contractor availability, and escalating construction costs. Penalizing agencies risks further disadvantaging communities already struggling wo secure competitive grants.”
ASSEMBLY FLOOR: 58-20, 5/28/26
AYES: Addis, Aguiar-Curry, Ahrens, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Connolly, Elhawary, Fong, Gabriel, Garcia, Gipson, Mark González, Haney, Harabedian, Hart, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Pellerin, Petrie-Norris, Ramos, Ransom, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Valencia, Ward, Wicks, Wilson, Zbur, Rivas
NOES: Alanis, Castillo, Chen, Davies, DeMaio, Dixon, Ellis, Flora, Gallagher, Jeff Gonzalez, Hadwick, Hoover, Johnson, Lackey, Macedo, Patterson, Sanchez, Ta, Tangipa, Wallis
NO VOTE RECORDED: Quirk-Silva, Celeste Rodriguez
Prepared by: Isabelle LaSalle / TRANS. / (916) 651-4121
8/5/26 15:04:30
**** END ****
California Transportation Commission, 2025 Annual report 2025 Annual Report to the California Legislature ↑
SENATE COMMITTEE ON TRANSPORTATION
Senator Dave Cortese, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 6/30/2026
Author: | Wicks | ||
Version: | 6/22/2026 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Isabelle LaSalle | ||
SUBJECT:
DIGEST: This bill directs the California Transportation Commission (CTC) to establish penalties for failure to use Active Transportation Program (ATP) funds in a timely manner, clarifies ATP eligibility criteria related to projects that provide access to transit, and expands the goals of ATP to include increasing the proportion of trips accomplished by accessing public transit.
ANALYSIS:
Existing law:
- Establishes ATP within the California Department of Transportation (Caltrans) to encourage increased use of active modes of transportation, such as biking and walking, expresses the intent of the Legislature that the program achieve all of the following goals:
- Increase the proportion of trips accomplished by biking and walking.
- Increase safety and mobility for nonmotorized users.
- Advance the active transportation efforts of regional agencies to achieve greenhouse gas reduction goals pursuant to Senate Bill 375 (Steinberg, Chapter 728, Statutes of 2008) and Senate Bill 391 (Liu, Chapter 585, Statutes of 2009).
- Enhance public health, including reduction of childhood obesity through the use of programs including, but not limited to, projects eligible for Safe Routes to School Program funding.
- Ensure that disadvantaged communities fully share in the benefits of the program.
- Provide a broad spectrum of projects to benefit many types of active transportation users. (Streets and Highways (SHC) §2380)
- Requires CTC to ensure that eligible projects meet one or more of the above goals and authorizes it to give increased weight to projects meeting multiple goals. (SHC §2382)
- Requires CTC to develop ATP guidelines and project selection criteria in consultation with an ATP Workgroup; the guidelines must include topics like project eligibility, application timelines, application rating and ranking criteria, project monitoring, reporting, and transparency, and project performance measurement. (SHC §2382)
- Requires the guidelines to ensure that no less than 25% of overall program funds benefit disadvantaged communities during each program cycle. (SHC §2382)
- Requires CTC to include, but not be limited by, the following project types in its project eligibility guidelines:
- Development of new bikeways and walkways, or improvements to existing bikeways and walkways, that improve mobility, access, or safety for nonmotorized users.
- Secure bicycle parking at employment centers, park and ride lots, rail and transit stations, and ferry docks and landings.
- Bicycle-carrying facilities on public transit, including rail and ferries.
- Installation of traffic control devices to improve the safety of pedestrians and bicyclists.
- Elimination of hazardous conditions on existing bikeways and walkways.
- Maintenance of bikeways and walkways.
- Recreational trails and trailheads, park projects that facilitate trail linkages or connectivity to nonmotorized corridors, and conversion of abandoned railroad corridors to trails.
- Safe Routes to School projects that improve the safety of children walking and bicycling to school.
- Safe routes to transit projects, which encourage transit by improving biking and walking routes to mass transportation facilities and school bus stops.
- Educational programs to increase biking and walking, and other noninfrastructure investments that demonstrate effectiveness in increasing active transportation. (SHC §2382)
- Requires CTC to include, but not be limited by, the following criteria in project selection guidelines:
- Demonstrated needs of the applicant.
- Potential for reducing pedestrian and bicyclist injuries and fatalities.
- Potential for encouraging increased walking and bicycling, especially among students.
- Potential for encouraging increased access to public transit.
- Identification of safety hazards for pedestrians and bicyclists.
- Identification of walking and bicycling routes to and from schools, transit facilities, stops and stations, and community centers.
- Identification of the local public participation process that culminated in the project proposal, which may include noticed public meetings and consultation with local stakeholders.
- Benefits to disadvantaged communities.
- Cost-effectiveness, defined as maximizing the impact of the funds provided.
- The adoption by a city or county applicant of a bicycle transportation plan, a pedestrian plan, a safe routes to school plan, or an overall active transportation plan.
- Use of the California Conservation Corps or a qualified community conservation corps as construction partners.
- Other factors, such as potential for reducing congestion, improving air quality, reducing greenhouse gas emissions, and increasing and improving connectivity and mobility of nonmotorized users.
This bill:
- Expands the goals of ATP to include increasing the proportion of trips accomplished by accessing public transit stops, stations, and other transit facilities.
- Includes a delayed implementation establishing that on or after January 1, 2028, the bill would:
- For the purposes of the development of ATP project eligibility guidelines, revise and expand the definition of “safe routes to transit,” to include projects that encourage access to transit station areas, planned transit or school bus stops, transit corridors, and transit-oriented development planning areas, and projects that will expand access to transit in underserved or rural areas.
- Add the potential for encouraging increased access to public transit to the project selection criteria CTC must consider in the development of ATP guidelines.
- Require, instead of authorize, ATP guidelines to include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects in order to scale funding for larger or network level active transportation improvements.
- Require the ATP project selection guidelines to include a progressive range of penalties that range from a deduction of points to disqualification for an ATP applicant that failed to use previously received program funds in a timely manner. Specifies that CTC must take into consideration factors that are not under the control of an applicant and may impose no penalties or delayed penalties.
- Requires the ATP project selection guidelines to include a requirement that an applicant consult the executive officer of the transit agency operating in the project corridor if the project will be adjacent to an existing bus, shuttle, or paratransit route. The consultation must provide project information, expected impact on the transit route, and a statement that the applicant will continue consultation with the transit agency should the grant be awarded.
COMMENTS:
- Purpose of the bill. According to the author, “AB 2168 makes a series of modest, commonsense improvements to ensure California's Active Transportation Program funds are spent effectively and efficiently. It modernizes the definition of safe routes to transit, shifting focus toward transit-rich corridors, infill opportunity areas, station walksheds, and underserved or rural areas — places where active transportation investments provide the deepest community benefits, giving people the option to potentially not drive at all. It adds transit access as an explicit project selection criterion, aligning with California's broader climate and housing goals. It directs the state to provide recommendations to maximize complimentary commitments of state transportation improvement program (STIP) funds to scale funding for larger or network-level active transportation improvements. And it establishes a graduated penalty structure for grantees who fail to spend funds on time, helping ensure that awarded dollars move from paper to pavement without delay.”
- ATP Background. The Active Transportation Program was created by SB 99 (Committee on Budget, Chapter 359, Statutes of 2013) to encourage increased use of active modes of transportation. Administered by CTC, the goals of ATP include increasing the proportion of trips accomplished by walking and biking, increasing the safety and mobility of non-motorized users, advancing efforts of regional agencies to achieve greenhouse gas reduction goals, enhancing public health, and providing a broad spectrum of projects to benefit many types of users including disadvantaged communities. In 2017, the Legislature passed and the Governor signed SB 1 (Beall, Chapter 5, Statutes of 2017) which directed $100 million annually from the Road Maintenance and Rehabilitation Account to the ATP, significantly augmenting the available funding for this popular program.
- ATP is highly competitive. CTC has programmed $3.9 billion to over 1,200 ATP projects statewide over the course of seven programming cycles.
However, ATP remains significantly oversubscribed as the demand for active transportation projects far outpaces the available funds. The 2025 ATP had a funding capacity of $168.7 million, one of the lowest in the history of the program, and funded nine projects in its statewide component, compared to 67 projects funded in the previous cycle. This was due to the $400 million reduction to the program in the 2024-25 State Budget. CTC received 277 applications requesting $2.5 billion for projects valued at $4.1 billion, almost 15 times greater than the 2025 Program’s funding capacity.[1]
- Funding safe routes to transit. AB 2168 makes numerous changes to ATP statute to promote projects with links to transit. Among these changes, the bill adds increasing access to public transit stops, stations, and other transit facilities to the overarching goals of ATP. Although transit access is not specifically listed in ATP’s overarching goals, safe routes to transit projects are currently eligible for ATP funding. These projects encourage transit by improving biking and walking routes to mass transportation facilities and school bus stops. This bill modifies the definition of safe routes to transit to include planned transit or school bus stops, transit corridors, transit-oriented development planning areas, and projects that will expand access to transit in underserved or rural areas. CTC currently considers ATP applicants’ connectivity to key destinations, including connections to transit. AB 2168 clarifies this existing requirement by adding additional specificity related to transit stops, stations, and access. It is not clear to what extent the modifications will actually change which projects are eligible, and eventually selected, for ATP funding.
- Penalties for delayed projects. In response to concerns that a small number of recipients of ATP funding have not used the funds in a timely manner, this bill directs CTC to develop a progressive range of penalties to penalize recipients for these delays. The penalties would need to range from a deduction of points to disqualification for an applicant. CTC would need to consider factors that are not under the control of an applicant and would have the flexibility to choose not to impose penalties if appropriate.
This provision builds off CTC’s current practice. The Commission currently monitors projects funded through ATP to track the progress of project delivery.[2] CTC expects certain deadlines to be met as programmed projects are implemented. If the expected deadlines are not met and a time extension is not approved prior to the expiration of a deadline, the ATP funds will lapse, and the project or project phase will be deleted from the ATP. Lapsed funds are returned to ATP for use in future cycles. For example, construction contracts must be awarded within six months of an approved allocation. CTC grants extensions for a range of circumstances that could delay a project, such as wildfires.[3]
Writing in support, the California Big City Mayors Coalition states, “[t]he coalition also supports the bill’s accountability provisions, which create clearer expectations and potential consequences for projects that do not use awarded funds in a timely manner. These provisions help ensure limited and competitive transportation dollars are used efficiently and that high-impact projects are delivered without unnecessary delays.”
- Other changes to ATP. AB 2168 makes additional, largely clarifying, changes to ATP’s eligibility criteria and project selection guidelines. Among these changes, the bill seeks to reward applicants that use other sources of funding to scale funding for larger or network level active transportation improvements. Currently, CTC can (and does) incentive applicants to maximize ATP funding by utilizing funding from other sources for the projects, too. The bill would require CTC to continue this practice. The bill also includes requirements that a project applicant consult the executive officer of the transit agency operating in the project corridor if the project will be adjacent to an existing bus, shuttle, or paratransit route.
Related/previous Legislation:
SB 99 (Committee on Budget, Chapter 359, Statutes of 2013) – Created the “Active Transportation Program” which distributes funding for human-powered transportation projects and programs.
SB 1 (Beall, Chapter 5, Statutes of 2017) – Increased several taxes and fees to raise the equivalent of roughly $52.4 billion over ten years in new transportation revenues and makes adjustments for inflation every year; directs the funding to be used towards deferred maintenance on the state highways and local streets and roads, and to improve the state's trade corridors, transit, and active transportation facilities.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
POSITIONS: (Communicated to the committee before noon on Wednesday, June 24, 2026.)
SUPPORT:
California Bicycle Coalition (source)
350 Bay Area Action
350 Sacramento
Activesgv
Albany Strollers & Rollers
Big City Mayors
Bike Coalition San Diego County
Bike Concord
Bike East Bay
Bike LA
Bike Monterey
Bike Walk Alameda
Bike Walnut Creek
Bikewalkcv (castro Valley)
California Big City Mayors Coalition
California Teachers Association
Center for Community Action and Environmental Justice (CCAEJ)
Chico Velo
Climate Plan
Coalition for Clean Air
Ecology Action
El Cerrito Richmond Annex Walk & Roll
Inland Empire Biking Alliance
Los Angeles Critical Mass
Marin County Bicycle Coalition
Monterey-salinas Transit (MST)
Move LA
Move Santa Barbara County
Napa County Bicycle Coalition (napa Bike)
Nrdc
People for Bikes
Sacramento Area Bicycle Advocates
San Diego 350
San Francisco Bicycle Coalition
Santa Monica Safe Streets Alliance
Santa Monica Spoke
Shasta Living Streets
Silicon Valley Bicycle Coalition
Slow Down Sacramento
Streets for All
Streets Forward
Sunnyvale Safe Streets
Transbay Coalition
Transform
Vibrant Lafayette
Walk Bike Berkeley
Zerow.org
OPPOSITION:
Shasta County Board of Supervisors
-- END --
California Transportation Commission, 2025 Annual report 2025 Annual Report to the California Legislature ↑
ASSEMBLY THIRD READING
ATR Bill Id:AB 2168
Author:(Wicks)
As Amended Ver:May 18, 2026
Majority vote
SUMMARY
Expands the types of projects eligible for Active Transportation Program (ATP) funding to include projects that provide access to transit and requires the California Transportation Commission (CTC), on or after January 1, 2028, to include in its ATP guidelines penalties for failure to use ATP funds in a timely manner.
Major Provisions
- Expands the goals of ATP to include increasing the proportion of trips accomplished by accessing public transit stops, stations, and other transit facilities.
- For the purposes of the development of ATP project eligibility guidelines, revises and expands the definition of “safe routes to transit” to include projects that encourage access to transit station areas, planned transit, transit corridors, and transit-oriented development planning areas, and projects that will expand access to transit in underserved or rural areas.
- Adds the following to the project selection criteria the CTC must consider in the development of ATP guidelines:
- Potential for encouraging increased access to public transit.
- Recommendations to maximize commitments of state transportation improvement program funds to projects funded by the program in order to scale funding for larger or network-level active transportation improvements.
- Requires, instead of authorizes, the CTC, on or after January 1, 2028, to include in ATP guidelines incentives intended to maximize the potential for attracting funds other than program funds for eligible projects
- Requires the CTC, on or after January 1, 2028, to include in ATP guidelines a progressive range of penalties that range from a deduction of points to disqualification for an applicant that failed to use previously received program funds in a timely while considering factors not under the control of an applicant.
COMMENTS
Evolution of Safe Routes to Schools to ATP. SB 99 (Committee on Budget), Chapter 359, Statutes of 2013 created the ATP, which represents an amalgamation of historically small, dedicated grant programs for Safe Routes to Schools (SRTS), bicycle programs, and recreational trails. The concept of SRTS was indirectly inspired by a 1973 federal law making grants to states to increase bicycle and pedestrian safety. This provided the foundation, many years later, for Congress to pass the federal SRTS program in 2005 with the goal of improving the ability of primary and middle school students to safely walk and bicycle to school.
ATP is chronically over-subscribed. Today, the ATP is competitive grant program funded by state and federal sources at approximately $123 million annually and while continuing to support SRTS projects it has evolved to fund bike paths, safe routes to transit, other non-motorized forms of transport (e.g., scooters, wheelchairs), development of relevant planning documents, and education and "encouragement" activities. It is a highly popular program—according to the CTC, in its 7th and most recent cycle (2025), one of the most competitive since inception, it received 277 project applications requesting $2.5 billion in funds, about 15 times the $169 million that was available. Half of total funding is reserved for statewide projects, 40% is reserved for projects within the boundaries of Metropolitan Planning Organizations in urban areas with populations greater than 200,000, and the remaining 10% is dedicated for small urban/rural regions with populations less than 200,000.
According to the CTC, "The Active Transportation Program continues to face significant unmet demand, as communities across the state look to the program to fund critical active transportation projects needed to meet California's safety, climate, and equity goals. Sustained and additional funding is needed to fund the hundreds of critically needed high-quality projects that remain unfunded each cycle." Through the 6th cycle, 1,148 projects have been programmed (i.e., funding approved) and 551 or 48% of projects have been completed.
The CTC already incentivizes and rewards transit access projects. This bill requires the CTC, when developing ATP project eligibility and selection guidelines, to include as a new criterion the potential for encouraging increased access to public transit. This bill does not define “transit access” but the sponsors have described it as extending a bike or pedestrian trip or connecting transportation networks like a bike path to a transit facility. According to the author:
Current ATP statute and guidelines do not adequately prioritize the locations where active transportation investments generate the greatest return on investment. Specifically, the program's existing definition of "safe routes to transit" fails to specify the broader landscape of transit-supportive geography—station areas, frequent transit corridors, transit stop walksheds, and infill—where active transportation improvements can most effectively connect people to transit and reduce vehicle miles traveled (VMT).
It is unclear if this bill would result in outcomes substantially different than the status quo. Program guidelines and scoring criteria that the CTC has established already incentivize applicants to consider project "need in the context of connectivity to key destinations including connections to transit, mobility to access everyday needs and services, and local public health concerns" and the CTC awards the greatest number of points (up to 38 out of 100) to this criterion. Projects facilitating improved transit connections, for example, already score higher today and an applicant can earn additional points for projects that transform a “non-motorized environment” or supporting existing or planned housing (especially affordable housing).
In fact, in the most recent round of ATP projects under consideration, the CTC awarded funding for 13 projects, 11 of which provide some connection to transit facilities such as public/school buses or light rail.
Nonetheless, it is reasonable to update ATP goals and guidelines to clarify eligibility of a wider scope of transit access projects and to modernize the program's statute to recognize the benefits of, for example, connecting a bike pathway to a transit facility. At the same time, the CTC should not give undue advantage to certain types of projects more commonly found in urban areas to avoid inadvertently disadvantaging less urban or rural regions of the state without the population density to support extensive public transit networks.
Finally, despite "transit access" projects being already eligible for higher scoring, there are other criteria, pursuant to ATP's statutory goals, that the CTC is obligated to consider providing access to everyday needs and services by walking or bicycling for persons of all ages and disabilities—not just commuters or transit users—or local public health concerns (e.g., childhood obesity). In fact, among other statutory goals, the CTC is mandated to consider "a broad spectrum of projects to benefit many types of active transportation users". This succinctly captures the CTC's delicate balancing act when considering six statutory goals and a minimum of ten eligible project types, also dictated by statute, particularly for a significantly over-subscribed program.
According to the Author
According to the author, "AB 2168 makes targeted, commonsense improvements to ensure California's Active Transportation Program (ATP) funds are spent effectively and efficiently. The legislation modernizes the definition of safe routes to transit, shifting focus toward transit-rich corridors, infill opportunity areas, and station walksheds — places where active transportation investments provide the deepest community benefits, giving people the option to not drive at all. It adds transit access as an explicit project selection criterion, aligning ATP priorities with California's broader climate and housing goals. It rewards applicants who leverage State Transportation Improvement Program (STIP) funds to active transportation. And it establishes a clear penalty structure for grantees who fail to spend funds on time, ensuring that awarded dollars move from paper to pavement without delay. Taken together, AB 2168's reforms sharpen the program's focus, reward strategic investment, and hold awardees accountable".
Arguments in Support
California Bicycle Coalition states: "AB 2168 makes critical updates to ensure that ATP investments more effectively increase access to public transit, particularly in transit-rich and infill areas. By prioritizing projects that improve walking and bicycling connections to transit, this bill helps reduce greenhouse gas emissions, supports California's climate goals, and promotes healthier, more sustainable communities. Additionally, the bill enhances accountability by introducing clearer expectations and potential consequences for projects that do not use awarded funds in a timely manner. This ensures that limited transportation dollars are used efficiently and that high-impact projects are delivered without unnecessary delays."
Arguments in Opposition
Nevada County Transportation Commission is opposed unless amended to the bill and has requested clarifying amendments to the provision requiring the CTC to include in its guidelines incentives to attract matching or outside funding.
FISCAL COMMENTS
According to the Assembly Appropriations Committee:
Minor costs to CTC.
To the extent the bill leads to projects not receiving ATP funding that would have received such funding, absent the bill, the bill creates cost pressure to provide additional monies to fund those projects, too (General Fund or special funds).
VOTES
ASM TRANSPORTATION: 11-4-1
YES: Wilson, Aguiar-Curry, Ahrens, Carrillo, Harabedian, Hart, Jackson, Papan, Ransom, Rogers, Sharp-Collins
NO: Davies, Hoover, Lackey, Macedo
ABS, ABST OR NV: Ávila Farías
ASM APPROPRIATIONS: 11-4-0
YES: Wicks, Aguiar-Curry, Calderon, Caloza, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache
NO: Hoover, Dixon, Ta, Tangipa
UPDATED
VERSION: May 18, 2026
CONSULTANT: Dan Chia / TRANS. / (916) 319-2093 FN: 0002995
Date of Hearing: May 6, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 2168
Author:(Wicks) – As Amended Ver:April 13, 2026
Policy Committee: | Transportation | Vote: | 11 - 4 |
|
| ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill expands the project types and criteria by which the California Transportation Commission (CTC) is to develop guidelines for the eligibility and selection of projects to be funded by the Active Transportation Program (ATP).
Specifically, this bill:
- Modifies the existing codified statement of legislative intent that the ATP increase the proportion of trips accomplished by biking and walking so that, under the bill, such trips include access to public transit stops and stations and other transit facilities.
- Regarding CTC’s development of ATP project eligibility guidelines, expands direction in current law that CTC include, among others, project types that are safe routes to transit projects, so that, under the bill, such projects encourage access to transit facilities and schoolbus stops by biking and walking, including, but not limited to, transit station areas, planned transit or schoolbus stops, transit corridors, transit-oriented development planning areas and projects that will expand access to transit in underserved or rural areas.
- Regarding CTC’s development of ATP project selection guidelines, expands direction in current law so that CTC includes in its criteria:
- Projects that identify walking and bicycling routes to and from school, transit facilities and community centers, so that, under the bill, such projects are those that identify walking and bicycling routes to and from community centers, schools, transit stops, stations and other transit facilities, including the potential for encouraging increased access to public transit.
- Recommendations to maximize commitments of state transportation improvement program (STIP) funds to projects in order to scale funding for larger or network-level active transportation improvements.
- Modifies existing law that allows CTC project eligibility guidelines to include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects.
- Requires CTC’s guidelines include progressive penalties that range from a deduction of points to disqualification for an applicant that failed to use previously received program funds in a timely manner, and, in doing so, consider factors that are not under the control of an applicant.
FISCAL EFFECT:
The requirements of this bill do not lead to significant new work for CTC. For the most part, the bill provides additional direction to CTC, rather than creating whole new funding categories or increasing funding obligations.
Nonetheless, CTC warns the bill, as written, will lead to substantial new—and duplicative—work of CTC. This is because CTC recently adopted guidelines for the 2027 ATP (Cycle 8), which opened the call for projects with an application deadline of June 22, 2027. CTC adopted those guidelines consistent with existing law, not consistent with the language in this bill. Yet, if this bill becomes law, CTC believes it would need to significantly modify its Cycle 8 guidelines and applicants would need to resubmit applications based on those revised guidelines, both of which CTC contends would likely be impossible within established timeframes. CTC suggests this situation could be avoided if the bill were to be amended with an effective date of January 1, 2028.
In addition, to the extent the bill leads to projects not receiving ATP funding that would have received such funding, absent the bill, the bill creates cost pressure to provide additional monies to fund those projects, too (General Fund or special funds).
COMMENTS:
State law establishes the ATP to fund projects that encourage increased use of active modes of transportation, such as biking and walking. The law directs CTC, in consultation with representatives of government agencies and active transportation stakeholder organizations with expertise in pedestrian and bicycle issues, to develop guidelines that govern CTC’s selection of projects to receive ATP funding and to award funds, based on those guidelines, in four-year funding cycles.
The ATP receives monies from both state and federal sources, including state excise taxes on gasoline. State funding for ATP has fluctuated wildly in recent years, as the state augmented the program, then revoked some of that augmentation in light the state’s own budget challenges. CTC describes a “typical” funding cycle as one with available ATP resources totaling $450 million and notes that requests consistently far outstrip the amount of ATP funding available.
According to People for Bikes, AB 2168 improves the ATP by:
encouraging larger, network-level investments and prioritizing projects that dedicate significant resources to active transportation. These changes will help maximize the impact of state funding, improve connectivity, and deliver more meaningful safety and mobility benefits for people biking and walking. Additionally, the inclusion of accountability measures for timely use of funds will help ensure that awarded projects move forward efficiently and that program dollars are put to work quickly.
In contrast, the Riverside County Transportation Commission (RCTC) objects to both (1) what it describes as the potential for an ATP applicant’s project to be disadvantaged if the applicant uses STIP funds for “critical transportation improvements” other than active transportation projects and (2) the bill’s penalty provisions, which RCTC sees as unfair, because, as RCTC describes it, “large projects often contain unanticipated delays and setbacks, which can be challenging for smaller agencies to manage while meeting original project schedules.”
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: April 20, 2026
ASSEMBLY COMMITTEE ON TRANSPORTATION
Lori D. Wilson, Chair
ABPCA Bill Id:AB 2168 (
Author:Wicks) – As Amended Ver:April 13, 2026
SUBJECT: Active Transportation Program: guidelines
SUMMARY: Expands the types of projects eligible for Active Transportation Program (ATP) funding to include projects that provide access to transit and requires the California Transportation Commission to include in ATP guidelines penalties for failure to use ATP funds in a timely manner. Specifically, this bill:
- Expands the goals of ATP to include increasing the proportion of trips accomplished by accessing public transit stops, stations, and other transit facilities.
- For the purposes of the development of ATP project eligibility guidelines, revises and expands the definition of “safe routes to transit” to include projects that encourage access to transit station areas, planned transit, transit corridors, and transit-oriented development planning areas, and projects that will expand access to transit in underserved or rural areas.
- Adds the following to the project selection criteria the CTC must consider in the development of ATP guidelines:
- Potential for encouraging increased access to public transit.
- Recommendations to maximize commitments of state transportation improvement program funds to projects funded by the program in order to scale funding for larger or network-level active transportation improvements.
- Requires, instead of authorizes, the ATP guidelines to include incentives intended to maximize the potential for attracting funds other than program funds for eligible projects
- Requires the ATP guidelines to include a progressive range of penalties that range from a deduction of points to disqualification for an applicant that failed to use previously received program funds in a timely while considering factors not under the control of an applicant.
EXISTING LAW:
- Establishes the ATP within the California Department of Transportation (Caltrans) to encourage increased use of active modes of transportation, such as biking and walking, expresses the intent of the Legislature that the program achieve all of the following goals:
- Increase the proportion of trips accomplished by biking and walking.
- Increase safety and mobility for nonmotorized users.
- Advance the active transportation efforts of regional agencies to achieve greenhouse gas reduction goals pursuant to Senate Bill 375 (Chapter 728, Statutes of 2008) and Senate Bill 391 (Chapter 585, Statutes of 2009).
- Enhance public health, including reduction of childhood obesity through the use of programs including, but not limited to, projects eligible for Safe Routes to School Program funding.
- Ensure that disadvantaged communities fully share in the benefits of the program.
- Provide a broad spectrum of projects to benefit many types of active transportation users (Streets and Highways (SHC) §2380).
- Requires the CTC to ensure that eligible projects meet one or more of the above goals and authorizes it to give increased weight to projects meeting multiple goals (SHC §2382).
- Requires the CTC to develop ATP guidelines and project selection criteria in consultation with an ATP Workgroup; the guidelines must include topics like project eligibility, application timelines, application rating and ranking criteria, project monitoring, reporting, and transparency, and project performance measurement (SHC §2382).
- Requires the guidelines to ensure that no less than 25% of overall program funds benefit disadvantaged communities during each program cycle (SHC §2382).
- Requires the CTC to include, but not be limited by, the following project types in its project eligibility guidelines:
- Development of new bikeways and walkways, or improvements to existing bikeways and walkways, that improve mobility, access, or safety for nonmotorized users.
- Secure bicycle parking at employment centers, park and ride lots, rail and transit stations, and ferry docks and landings.
- Bicycle-carrying facilities on public transit, including rail and ferries.
- Installation of traffic control devices to improve the safety of pedestrians and bicyclists.
- Elimination of hazardous conditions on existing bikeways and walkways.
- Maintenance of bikeways and walkways.
- Recreational trails and trailheads, park projects that facilitate trail linkages or connectivity to nonmotorized corridors, and conversion of abandoned railroad corridors to trails.
- Safe Routes to School projects that improve the safety of children walking and bicycling to school.
- Safe routes to transit projects, which encourage transit by improving biking and walking routes to mass transportation facilities and schoolbus stops.
- Educational programs to increase biking and walking, and other noninfrastructure investments that demonstrate effectiveness in increasing active transportation (SH C §2382).
- Requires the CTC to include, but not be limited by, the following criteria in project selection guidelines:
- Demonstrated needs of the applicant.
- Potential for reducing pedestrian and bicyclist injuries and fatalities.
- Potential for encouraging increased walking and bicycling, especially among students.
- Potential for encouraging increased access to public transit.
- Identification of safety hazards for pedestrians and bicyclists.
- Identification of walking and bicycling routes to and from schools, transit facilities, stops and stations, and community centers.
- Identification of the local public participation process that culminated in the project proposal, which may include noticed public meetings and consultation with local stakeholders.
- Benefit to disadvantaged communities.
- Cost-effectiveness, defined as maximizing the impact of the funds provided.
- The adoption by a city or county applicant of a bicycle transportation plan, a pedestrian plan, a safe routes to school plan, or an overall active transportation plan.
- Use of the California Conservation Corps or a qualified community conservation corps as construction partners.
- Other factors, such as potential for reducing congestion, improving air quality, reducing greenhouse gas emissions, and increasing and improving connectivity and mobility of nonmotorized users.
FISCAL EFFECT: Unknown
COMMENTS: According to the author, “AB 2168 makes targeted, commonsense improvements to ensure California's Active Transportation Program (ATP) funds are spent effectively and efficiently. The legislation modernizes the definition of safe routes to transit, shifting focus toward transit-rich corridors, infill opportunity areas, and station walksheds — places where active transportation investments provide the deepest community benefits, giving people the option to not drive at all. It adds transit access as an explicit project selection criterion, aligning ATP priorities with California's broader climate and housing goals. It rewards applicants who leverage State Transportation Improvement Program (STIP) funds to active transportation. And it establishes a clear penalty structure for grantees who fail to spend funds on time, ensuring that awarded dollars move from paper to pavement without delay. Taken together, AB 2168’s reforms sharpen the program's focus, reward strategic investment, and hold awardees accountable”.
Evolution of Safe Routes to Schools to ATP. SB 99 (Committee on Budget), Chapter 359, Statutes of 2013 created the ATP, which represents an amalgamation of historically small, dedicated grant programs for Safe Routes to Schools (SRTS), bicycle programs, and recreational trails. According to the Senate Budget Committee analysis of SB 99, “The intent of combining this funding is to improve the flexibility of these funds and reduce the administrative burden of having several small independent grant programs.”
The concept of SRTS was indirectly inspired by a 1973 federal law (itself inspired by Denmark) making grants to states to increase bicycle and pedestrian safety. This provided the foundation, many years later, for Congress to pass the federal SRTS program in 2005 with the goal of improving the ability of primary and middle school students to safely walk and bicycle to school. In 2012, Congress combined the SRTS program with other bicycling and walking programs into the Transportation Alternatives Program, which funds a more expansive suite of on- and off-road trail, traffic calming, and environmental mitigation projects but consequently cut funding for SRTS.
ATP is chronically over-subscribed. Today, the ATP is competitive program funded by state (e.g., SB 1) and federal sources at approximately $123 million annually and while continuing to support SRTS projects it has evolved to fund bike paths and related facilities, safe routes to transit, other non-motorized forms of transport (e.g., scooters, wheelchairs), development of bike and other active transportation planning documents, and education and “encouragement” activities. It is a highly popular program—according to the CTC, in its 7th and most recent cycle (2025), one of the most competitive since inception, it received 277 project applications requesting $2.5 billion in funds, about 15 times the $169 million that was available. Half of total funding is reserved for statewide projects, 40% is reserved for projects within the boundaries of Metropolitan Planning Organizations (MPOs) in urban areas with populations greater than 200,000, and the remaining 10% is dedicated for small urban/rural regions with populations less than 200,000.
As stated by the CTC, “The Active Transportation Program continues to face significant unmet demand, as communities across the state look to the program to fund critical active transportation projects needed to meet California’s safety, climate, and equity goals. Sustained and additional funding is needed to fund the hundreds of critically needed high-quality projects that remain unfunded each cycle.” Through the 6th cycle, 1,148 projects have been programmed (i.e., funding approved) and 551 or 48% of projects have been completed.
Is greater emphasis on transit access needed or justified? This bill requires the CTC, when developing ATP project eligibility and selection guidelines, to include as a new criterion the potential for encouraging increased access to public transit. This bill does not define “transit access” but the sponsors have described it as extending a bike or pedestrian trip or connecting transportation networks like a bike path to a transit facility. According to the author:
Current ATP statute and guidelines do not adequately prioritize the locations where active transportation investments generate the greatest return on investment. Specifically, the program’s existing definition of “safe routes to transit” fails to specify the broader landscape of transit-supportive geography—station areas, frequent transit corridors, transit stop walksheds, and infill—where active transportation improvements can most effectively connect people to transit and reduce vehicle miles traveled (VMT).
In a budget constrained environment, the author believes that “state must be strategic about where and how it directs its limited active transportation dollars.”
It is unclear if this bill would result in outcomes substantially different than the status quo. Program guidelines and scoring criteria that the CTC has established already incentivize applicants to consider project “need in the context of connectivity to key destinations including connections to transit, mobility to access everyday needs and services, and local public health concerns” and the CTC awards the greatest number of points (up to 38 out of 100) to this criterion. Projects facilitating improved transit connections, for example, already score higher today and an applicant can earn additional points for projects that transform a “non-motorized environment” (e.g., complementing transit) or supporting existing or planned housing (especially affordable housing).
In fact, in the most recent round of ATP projects under consideration, the CTC awarded funding for 13 projects (in the statewide/small urban/rural buckets), 11 of which provide some connection to transit facilities such as public/school buses or light rail. For example, a project in the City of Inglewood will provide a safer means of connecting residents in the surrounding disadvantaged community to the Westchester/Veterans transit station, Big Blue Bus Route 14 bus stop, and LA Metro Bus 857 stop, and another improvement will connect communities east of Interstate-405 to the LA Metro network (through the transit station).
Nonetheless, it is reasonable to update ATP goals and guidelines to clarify eligibility of a wider scope of transit access projects and to modernize the program’s statute to recognize the benefits of, for example, connecting a bike pathway to a transit facility. At the same time, the committee urges caution in over-weighting certain types of projects for modes of transport more commonly found in urban areas to avoid inadvertently disadvantaging less urban or rural regions of the state without the population density to support extensive public transit networks.
In many rural communities, the only form of transit is a fixed bus route with limited service or paratransit and populations or ridership numbers would not likely support significant investments in transit networks. Transportation needs are, by definition, locally and geographically determined and while the state has expressed some preference for modes that minimize greenhouse gas emissions or VMTs, within the ATP context, all modes eligible for funding can be characterized as reducing pollution to the extent they avoid or minimize VMTs.
Finally, despite “transit access” projects being already eligible for higher scoring, there are other criteria, pursuant to ATP’s statutory goals, that the CTC is obligated to consider like access to everyday needs and services by walking or bicycling for persons of all ages and disabilities—not just commuters or transit users—or local public health concerns (e.g., childhood obesity). In fact, among other statutory goals, the CTC is mandated to consider “a broad spectrum of projects to benefit many types of active transportation users”. This succinctly captures the CTC’s delicate balancing act when considering six statutory goals and a minimum of ten eligible project types, also dictated by statute, particularly for a significantly over-subscribed program.
Writing in support, California Bicycle Coalition states: “AB 2168 makes critical updates to ensure that ATP investments more effectively increase access to public transit, particularly in transit-rich and infill areas. By prioritizing projects that improve walking and bicycling connections to transit, this bill helps reduce greenhouse gas emissions, supports California’s climate goals, and promotes healthier, more sustainable communities. Additionally, the bill enhances accountability by introducing clearer expectations and potential consequences for projects that do not use awarded funds in a timely manner. This ensures that limited transportation dollars are used efficiently and that high-impact projects are delivered without unnecessary delays.”
Writing in opposition, the Nevada County Transportation Commission states: “AB 2168 would redirect limited dollars to more urbanized areas of the state and would disadvantage communities like those in Nevada County. This policy shift is in direct conflict with the state’s other climate related goals which encourage all communities – urban, suburban, and rural – to become more multimodal. Finally, while NCTC understands the rationale for imposing penalties to ensure timely use of funds, the bill’s approach is overly punitive and does not adequately account for delays outside a lead agency’s control. Projects are frequently impacted by factors such as environmental permitting timelines, utility coordination, right-of-way acquisition, supply chain constraints, and funding synchronization across multiple sources. Penalizing agencies for these realities risks discouraging participation in state programs and undermining the very project delivery goals the bill seeks to advance.”
Related legislation. AB 1475 (Soto), Chapter 663, Statutes of 1999 required Caltrans to establish and administer a “Safe Routes to School” program pursuant to federal law for the construction of bicycle and pedestrian safety and traffic calming projects.
SB 99 (Committee on Budget), Chapter 359, Statutes of 2013 subsumed the “Safe Routes to School” program into a newly created ATP.
REGISTERED SUPPORT / OPPOSITION:
Support
California Bicycle Coalition
PeopleForBikes
Streets for All
Monterey-Salinas Transit District (if amended)
One Individual
Opposition
Nevada County Transportation Commission (unless amended)
Riverside County Transportation Commission
Analysis Prepared by: Dan Chia / TRANS. / (916) 319-2093
Bill Author
Bill Co-Author(s):