AB 2175: Renewable electrical generation facilities: multiple meters: aggregation: logistics businesses and manufacturing businesses.
- Session Year: 2025-2026
- House: Assembly
- Latest Version Date: 2026-07-16
Current Status:
Passed
(2026-07-16: Chaptered by Secretary of State - Chapter 94, Statutes of 2026.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires each electrical corporation, local publicly owned electric utility, or electrical cooperative, or any other entity that offers electrical service, except as provided, to develop a standard contract or tariff providing for net energy metering, and to make this standard contract or tariff available to eligible customer-generators using renewable electrical generation facilities, as specified. Pursuant to its authority, the commission issued a decision revising net energy metering tariff and subtariffs, commonly known as the net billing tariff. Existing law authorizes an eligible customer-generator with multiple meters to aggregate the electrical load of the meters located on the property where the renewable electrical generation facility is located and on all property adjacent or contiguous to the property on which the renewable electrical generation facility is located, if those properties are solely owned, leased, or rented by the eligible customer-generator, as provided.
This bill would require the commission, for purposes of certain net energy metering contracts or tariffs, to ensure that logistics businesses and manufacturing businesses are eligible customer-generators for purposes of aggregating multiple meters, as described above, if the commission extends the application of that provision.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires each electrical corporation, local publicly owned electric utility, or electrical cooperative, or any other entity that offers electrical service, except as provided, to develop a standard contract or tariff providing for net energy metering, and to make this standard contract or tariff available to eligible customer-generators using renewable electrical generation facilities, as specified. Pursuant to its authority, the commission issued a decision revising net energy metering tariff and subtariffs, commonly known as the net billing tariff. Existing law authorizes an eligible customer-generator with multiple meters to aggregate the electrical load of the meters located on the property where the renewable electrical generation facility is located and on all property adjacent or contiguous to the property on which the renewable electrical generation facility is located, if those properties are solely owned, leased, or rented by the eligible customer-generator, as provided.
This bill would require the commission, for purposes of certain net energy metering contracts or tariffs, to ensure that logistics businesses and manufacturing businesses are eligible customer-generators for purposes of aggregating multiple meters, as described above, if the commission extends the application of that provision.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law defines electrical corporation, for purposes of the Public Utilities Act, to include every corporation or person owning, controlling, operating, or managing any electric plant for compensation within this state, except as provided. Existing law requires each electrical corporation, local publicly owned electric utility, or electrical cooperative, or any other entity that offers electrical service, except as provided, to develop a standard contract or tariff providing for net energy metering, and to make this standard contract or tariff available to eligible customer-generators using renewable electrical generation facilities, as specified. Pursuant to its authority, the commission issued a decision revising net energy metering tariff and subtariffs, commonly known as the net billing tariff. Existing law authorizes an eligible customer-generator with multiple meters to aggregate the electrical load of the meters located on the property where the renewable electrical generation facility is located and on all property adjacent or contiguous to the property on which the renewable electrical generation facility is located, if those properties are solely owned, leased, or rented by the eligible customer-generator, as provided.
This bill would revise and recast the definition of electrical corporation to, among other things, eliminate certain existing exceptions to the definition of electrical corporation, thereby expanding the scope of that term and the entities over which the PUC has regulatory authority. The bill would additionally exempt from that definition a corporation or person employing one or more distributed energy resources, as defined, that has the capacity to be coupled with one or more energy storage systems for the generation of electricity primarily for specified uses. The bill would also exempt from the definition of electrical corporation a microgrid, as defined, that primarily serves the included load of the microgrid, as provided. The bill would also make various conforming changes.This bill would authorize the State Energy Resources Conservation and Development Commission (Energy Commission) to develop safety standards for microgrids and to issue optional guidelines for the governance and oversight of microgrids to local governments, as provided. The bill would provide that a microgrid is not subject to the jurisdiction of the PUC with respect to rates, operations, or safety, but would require the PUC to retain jurisdiction over the interconnection of a microgrid to the distribution system of a large electrical corporation, as specified.Existing law requires the PUC to require each residential unit in an apartment house or similar multiunit residential structure, condominium, or mobilehome park issued a building permit on or after July 1, 1982, with certain exceptions, to be individually metered for electrical and gas service.This bill would additionally except from that requirement an accessory dwelling unit, as defined, if the owner of the property on which the accessory dwelling unit is located elects to have the accessory dwelling units electrical and gas services metered through existing or upgraded utility meters located on that property, and any new, significantly altered, or converted multiunit residential structure, condominium, or mobilehome park for which a building permit has been obtained on or after January 1, 2026, that includes the installation of a distributed energy system that is meant to offset all or a portion of the tenants usage, as provided.This bill would require the commission, for purposes of certain net energy metering contracts or tariffs, to ensure that logistics businesses and manufacturing businesses are eligible customer-generators for purposes of aggregating multiple meters, as described above, if the commission extends the application of that provision.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC commission is a crime.
Because certain of the above provisions would be part of the act and a violation of a PUC commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law defines electrical corporation, for purposes of the Public Utilities Act, to include every corporation or person owning, controlling, operating, or managing any electric plant for compensation within this state, except as provided.
This bill would revise and recast the definition of electrical corporation to, among other things, eliminate certain existing exceptions to the definition of electrical corporation, thereby expanding the scope of that term and the entities over which the PUC has regulatory authority. The bill would additionally exempt from that definition a corporation or person employing one or more distributed energy resources, as defined, that has the capacity to be coupled with one or more energy storage systems for the generation of electricity primarily for specified uses. The bill would also exempt from the definition of electrical corporation a microgrid, as defined, that primarily serves the included load of the microgrid, as provided. The bill would also make various conforming changes.
This bill would authorize the State Energy Resources Conservation and Development Commission (Energy Commission) to develop safety standards for microgrids and to issue optional guidelines for the governance and oversight of microgrids to local governments, as provided. The bill would provide that a microgrid is not subject to the jurisdiction of the PUC with respect to rates, operations, or safety, but would require the PUC to retain jurisdiction over the interconnection of a microgrid to the distribution system of a large electrical corporation, as specified.
Existing law requires the PUC to require each residential unit in an apartment house or similar multiunit residential structure, condominium, or mobilehome park issued a building permit on or after July 1, 1982, with certain exceptions, to be individually metered for electrical and gas service.
This bill would additionally except from that requirement an accessory dwelling unit, as defined, if the owner of the property on which the accessory dwelling unit is located elects to have the accessory dwelling units electrical and gas services metered through existing or upgraded utility meters located on that property, and any new, significantly altered, or converted multiunit residential structure, condominium, or mobilehome park for which a building permit has been obtained on or after January 1, 2026, that includes the installation of a distributed energy system that is meant to offset all or a portion of the tenants usage, as provided.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain of the above provisions would be part of the act and a violation of a PUC action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law establishes the policy of the state to modernize the states electrical transmission and distribution system to maintain safe, reliable, efficient, and secure electrical service, with infrastructure that can meet future growth in demand and achieve certain objectives, including the deployment and integration of cost-effective advanced electricity storage and peak-shaving technologies, as specified. Existing law requires the Public Utilities Commission, in consultation with certain entities, to determine the requirements for a smart grid deployment plan consistent with that policy and federal law, as specified.This bill would repeal from those policy objectives the deployment and integration of cost-effective advanced electricity storage and peak-shaving technologies.Existing law establishes the policy of the state to modernize the states electrical transmission and distribution system to maintain safe, reliable, efficient, and secure electrical service, with infrastructure that can meet future growth in demand and achieve certain objectives, including the deployment and integration of cost-effective advanced electricity storage and peak-shaving technologies, as specified. Existing law requires the Public Utilities Commission, in consultation with certain entities, to determine the requirements for a smart grid deployment plan consistent with that policy and federal law, as specified.
This bill would repeal from those policy objectives the deployment and integration of cost-effective advanced electricity storage and peak-shaving technologies.
(a)The Legislature finds and declares that a program to provide net energy metering combined with net surplus compensation, coenergy metering, and wind energy cometering for eligible customer-generators is one way to encourage substantial private investment in renewable energy resources, stimulate in-state economic growth, reduce demand for electricity during peak consumption periods, help stabilize Californias energy supply infrastructure, enhance the continued diversification of Californias energy resource mix, reduce interconnection and administrative costs for electricity suppliers, and encourage conservation and efficiency.
(b)As used in this section, the following terms have the following meanings:
(1)Coenergy metering means a program that is the same in all other respects as a net energy metering program, except that the local publicly owned electric utility has elected to apply a generation-to-generation energy and time-of-use credit formula as provided in subdivision (i).
(2)Electrical cooperative means an electrical cooperative as defined in Section 2776.
(3)Electric utility means an electrical corporation, a local publicly owned electric utility, or an electrical cooperative, or any other entity, except an electric service provider, that offers electrical service. This section shall not apply to a local publicly owned electric utility that serves more than 750,000 customers and that also conveys water to its customers.
(4)(A)Eligible customer-generator means a residential customer, small commercial customer as defined in subdivision (h) of Section 331, or commercial, industrial, or agricultural customer of an electric utility, who uses a renewable electrical generation facility, or a combination of those facilities, with a total capacity of not more than one megawatt, that is located on the customers owned, leased, or rented premises, and is interconnected and operates in parallel with the electrical grid, and is intended primarily to offset part or all of the customers own electrical requirements.
(B)(i)Notwithstanding subparagraph (A), eligible customer-generator includes the Department of Corrections and Rehabilitation using a renewable electrical generation technology, or a combination of renewable electrical generation technologies, with a total capacity of not more than eight megawatts, that is located on the departments owned, leased, or rented premises, is interconnected and operates in parallel with the electrical grid, and is intended primarily to offset part or all of the facilitys own electrical requirements. The amount of any wind generation exported to the electrical grid shall not exceed 1.35 megawatt at any time.
(ii)Notwithstanding paragraph (2) of subdivision (e), an electrical corporation shall be afforded a prudent but necessary time, as determined by the executive director of the commission, to study the impacts of a request for interconnection of a renewable generator with a capacity of greater than one megawatt under this subparagraph. If the study reveals the need for upgrades to the transmission or distribution system arising solely from the interconnection, the electrical corporation shall be afforded the time necessary to complete those upgrades before the interconnection and those costs shall be borne by the customer-generator. Upgrade projects shall comply with applicable state and federal requirements, including requirements of the Federal Energy Regulatory Commission.
(C)(i)For purposes of this subparagraph, a United States Armed Forces base or facility is an establishment under the jurisdiction of the United States Army, Navy, Air Force, Marine Corps, Space Force, or Coast Guard.
(ii)Notwithstanding subparagraph (A), a United States Armed Forces base or facility is an eligible customer-generator if the base or facility uses a renewable electrical generation facility, or a combination of those facilities, the renewable electrical generation facility is located on premises owned, leased, or rented by the United States Armed Forces base or facility, the renewable electrical generation facility is interconnected and operates in parallel with the electrical grid, the renewable electrical generation facility is intended primarily to offset part or all of the base or facilitys own electrical requirements, and the renewable electrical generation facility has a generating capacity that does not exceed the lesser of 12 megawatts or one megawatt greater than the minimum load of the base or facility over the prior 36 months. Unless prohibited by federal law, a renewable electrical generation facility shall not be eligible for net energy metering for privatized military housing pursuant to this subparagraph if the renewable electrical generation facility was procured using a sole source process. A renewable electrical generation facility procured using best value criteria, if otherwise eligible, may be used for net energy metering for privatized military housing pursuant to this subparagraph. For these purposes, best value criteria means a value determined by objective criteria and may include, but is not limited to, price, features, functions, and life-cycle costs.
(iii)A United States Armed Forces base or facility that is an eligible customer generator pursuant to this subparagraph shall not receive compensation for exported generation.
(iv)Notwithstanding paragraph (2) of subdivision (e), an electrical corporation shall be afforded a prudent but necessary time, as determined by the executive director of the commission but not less than 60 working days, to study the impacts of a request for interconnection of a renewable electrical generation facility with a capacity of greater than one megawatt pursuant to this subparagraph. If the study reveals the need for upgrades to the transmission or distribution system arising solely from the interconnection, the electrical corporation shall be afforded the time necessary to complete those upgrades before the interconnection and the costs of those upgrades shall be borne by the eligible customer-generator. Upgrade projects shall comply with applicable state and federal requirements, including requirements of the Federal Energy Regulatory Commission. For a renewable generation facility that interconnects directly to the transmission grid or that requires transmission upgrades, the United States Armed Forces base or facility shall comply with all Federal Energy Regulatory Commission interconnection procedures and requirements.
(v)An electrical corporation shall make a tariff, as approved by the commission, available pursuant to this subparagraph by November 1, 2015.
(vi)This subparagraph shall not apply to a tariff made available pursuant to Section 2827.1.
(5)Large electrical corporation means an electrical corporation with more than 100,000 service connections in California.
(6)Net energy metering means measuring the difference between the electricity supplied through the electrical grid and the electricity generated by an eligible customer-generator and fed back to the electrical grid over a 12-month period as described in subdivisions (c) and (h).
(7)Net surplus customer-generator means an eligible customer-generator that generates more electricity during a 12-month period than is supplied by the electric utility to the eligible customer-generator during the same 12-month period.
(8)Net surplus electricity means all electricity generated by an eligible customer-generator measured in kilowatthours over a 12-month period that exceeds the amount of electricity consumed by that eligible customer-generator.
(9)Net surplus electricity compensation means a per kilowatthour rate offered by the electric utility to the net surplus customer-generator for net surplus electricity that is set by the ratemaking authority pursuant to subdivision (h).
(10)Ratemaking authority means, for an electrical corporation, the commission, for an electrical cooperative, its ratesetting body selected by its shareholders or members, and for a local publicly owned electric utility, the local elected body responsible for setting the rates of the local publicly owned utility.
(11)Renewable electrical generation facility means a facility that generates electricity from a renewable source listed in paragraph (1) of subdivision (a) of Section 25741 of the Public Resources Code. A small hydroelectric generation facility is not an eligible renewable electrical generation facility if it will cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(12)Wind energy cometering means any wind energy project greater than 50 kilowatts, but not exceeding one megawatt, where the difference between the electricity supplied through the electrical grid and the electricity generated by an eligible customer-generator and fed back to the electrical grid over a 12-month period is as described in subdivision (h). Wind energy cometering shall be accomplished pursuant to Section 2827.8.
(c)(1)Except as provided in paragraph (4) and in Section 2827.1, every electric utility shall develop a standard contract or tariff providing for net energy metering, and shall make this standard contract or tariff available to eligible customer-generators, upon request, on a first-come-first-served basis until the time that the total rated generating capacity used by eligible customer-generators exceeds 5 percent of the electric utilitys aggregate customer peak demand. Net energy metering shall be accomplished using a single meter capable of registering the flow of electricity in two directions. An additional meter or meters to monitor the flow of electricity in each direction may be installed with the consent of the eligible customer-generator, at the expense of the electric utility, and the additional metering shall be used only to provide the information necessary to accurately bill or credit the eligible customer-generator pursuant to subdivision (h), or to collect generating system performance information for research purposes relative to a renewable electrical generation facility. If the existing electrical meter of an eligible customer-generator is not capable of measuring the flow of electricity in two directions, the eligible customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is able to measure electricity flow in two directions. If an additional meter or meters are installed, the net energy metering calculation shall yield a result identical to that of a single meter. An eligible customer-generator that is receiving service other than through the standard contract or tariff may elect to receive service through the standard contract or tariff until the electric utility reaches the generation limit set forth in this paragraph. Once the generation limit is reached, only eligible customer-generators that had previously elected to receive service pursuant to the standard contract or tariff have a right to continue to receive service pursuant to the standard contract or tariff. Eligibility for net energy metering does not limit an eligible customer-generators eligibility for any other rebate, incentive, or credit provided by the electric utility, or pursuant to any governmental program, including rebates and incentives provided pursuant to the California Solar Initiative.
(2)An electrical corporation shall include a provision in the net energy metering contract or tariff requiring that any customer with an existing electrical generating facility and meter who enters into a new net energy metering contract shall provide an inspection report to the electrical corporation, unless the electrical generating facility and meter have been installed or inspected within the previous three years. The inspection report shall be prepared by a California licensed contractor who is not the owner or operator of the facility and meter. A California licensed electrician shall perform the inspection of the electrical portion of the facility and meter.
(3)(A)On an annual basis, every electric utility shall make available to the ratemaking authority information on the total rated generating capacity used by eligible customer-generators that are customers of that provider in the providers service area and the net surplus electricity purchased by the electric utility pursuant to this section.
(B)An electric service provider operating pursuant to Section 394 shall make available to the ratemaking authority the information required by this paragraph for each eligible customer-generator that is their customer for each service area of an electrical corporation, local publicly owned electrical utility, or electrical cooperative, in which the eligible customer-generator has net energy metering.
(C)The ratemaking authority shall develop a process for making the information required by this paragraph available to electric utilities, and for using that information to determine when, pursuant to paragraphs (1) and (4), an electric utility is not obligated to provide net energy metering to additional eligible customer-generators in its service area.
(4)(A)An electric utility that is not a large electrical corporation is not obligated to provide net energy metering to additional eligible customer-generators in its service area when the combined total peak demand of all electricity used by eligible customer-generators served by all the electric utilities in that service area furnishing net energy metering to eligible customer-generators exceeds 5 percent of the aggregate customer peak demand of those electric utilities.
(B)The commission shall require every large electrical corporation to make the standard contract or tariff available to eligible customer-generators, continuously and without interruption, until such times as the large electrical corporation reaches its net energy metering program limit or July 1, 2017, whichever is earlier. A large electrical corporation reaches its program limit when the combined total peak demand of all electricity used by eligible customer-generators served by all the electric utilities in the large electrical corporations service area furnishing net energy metering to eligible customer-generators exceeds 5 percent of the aggregate customer peak demand of those electric utilities. For purposes of calculating a large electrical corporations program limit, aggregate customer peak demand means the highest sum of the noncoincident peak demands of all of the large electrical corporations customers that occurs in any calendar year. To determine the aggregate customer peak demand, every large electrical corporation shall use a uniform method approved by the commission. The program limit calculated pursuant to this paragraph shall not be less than the following:
(i)For San Diego Gas and Electric Company, when it has made 607 megawatts of nameplate generating capacity available to eligible customer-generators.
(ii)For Southern California Edison Company, when it has made 2,240 megawatts of nameplate generating capacity available to eligible customer-generators.
(iii)For Pacific Gas and Electric Company, when it has made 2,409 megawatts of nameplate generating capacity available to eligible customer-generators.
(C)Every large electrical corporation shall file a monthly report with the commission detailing the progress toward the net energy metering program limit established in subparagraph (B). The report shall include separate calculations on progress toward the limits based on operating solar energy systems, cumulative numbers of interconnection requests for net energy metering eligible systems, and any other criteria required by the commission.
(D)Beginning July 1, 2017, or upon reaching the net metering program limit of subparagraph (B), whichever is earlier, the obligation of a large electrical corporation to provide service pursuant to a standard contract or tariff shall be pursuant to Section 2827.1 and applicable state and federal requirements.
(d)Every electric utility shall make all necessary forms and contracts for net energy metering and net surplus electricity compensation service available for download from the internet.
(e)(1)Every electric utility shall ensure that requests for establishment of net energy metering and net surplus electricity compensation are processed in a time period not exceeding that for similarly situated customers requesting new electric service, but not to exceed 30 working days from the date it receives a completed application form for net energy metering service or net surplus electricity compensation, including a signed interconnection agreement from an eligible customer-generator and the electric inspection clearance from the governmental authority having jurisdiction.
(2)Every electric utility shall ensure that requests for an interconnection agreement from an eligible customer-generator are processed in a time period not to exceed 30 working days from the date it receives a completed application form from the eligible customer-generator for an interconnection agreement.
(3)If an electric utility is unable to process a request within the allowable timeframe pursuant to paragraph (1) or (2), it shall notify the eligible customer-generator and the ratemaking authority of the reason for its inability to process the request and the expected completion date.
(f)(1)If a customer participates in direct transactions pursuant to paragraph (1) of subdivision (b) of Section 365, or Section 365.1, with an electric service provider that does not provide distribution service for the direct transactions, the electric utility that provides distribution service for the eligible customer-generator is not obligated to provide net energy metering or net surplus electricity compensation to the customer.
(2)If a customer participates in direct transactions pursuant to paragraph (1) of subdivision (b) of Section 365 or 365.1 with an electric service provider, and the customer is an eligible customer-generator, the electric utility that provides distribution service for the direct transactions may recover from the customers electric service provider the incremental costs of metering and billing service related to net energy metering and net surplus electricity compensation in an amount set by the ratemaking authority.
(g)Except for the time-variant kilowatthour pricing portion of any tariff adopted by the commission pursuant to paragraph (4) of subdivision (a) of Section 2851, each net energy metering contract or tariff shall be identical, with respect to rate structure, all retail rate components, and any monthly charges, to the contract or tariff to which the same customer would be assigned if the customer did not use a renewable electrical generation facility, except that eligible customer-generators shall not be assessed standby charges on the electrical generating capacity or the kilowatthour production of a renewable electrical generation facility. The charges for all retail rate components for eligible customer-generators shall be based exclusively on the customer-generators net kilowatthour consumption over a 12-month period, without regard to the eligible customer-generators choice as to from whom it purchases electricity that is not self-generated. Any new or additional demand charge, standby charge, customer charge, minimum monthly charge, interconnection charge, or any other charge that would increase an eligible customer-generators costs beyond those of other customers who are not eligible customer-generators in the rate class to which the eligible customer-generator would otherwise be assigned if the customer did not own, lease, rent, or otherwise operate a renewable electrical generation facility is contrary to the intent of this section, and shall not form a part of net energy metering contracts or tariffs.
(h)For eligible customer-generators, the net energy metering calculation shall be made by measuring the difference between the electricity supplied to the eligible customer-generator and the electricity generated by the eligible customer-generator and fed back to the electrical grid over a 12-month period. The following rules shall apply to the annualized net metering calculation:
(1)The eligible residential or small commercial customer-generator, at the end of each 12-month period following the date of final interconnection of the eligible customer-generators system with an electric utility, and at each anniversary date thereafter, shall be billed for electricity used during that 12-month period. The electric utility shall determine if the eligible residential or small commercial customer-generator was a net consumer or a net surplus customer-generator during that period.
(2)At the end of each 12-month period, where the electricity supplied during the period by the electric utility exceeds the electricity generated by the eligible residential or small commercial customer-generator during that same period, the eligible residential or small commercial customer-generator is a net electricity consumer and the electric utility shall be owed compensation for the eligible customer-generators net kilowatthour consumption over that 12-month period. The compensation owed for the eligible residential or small commercial customer-generators consumption shall be calculated as follows:
(A)For all eligible customer-generators taking service under contracts or tariffs employing baseline and over baseline rates, any net monthly consumption of electricity shall be calculated according to the terms of the contract or tariff to which the same customer would be assigned to, or be eligible for, if the customer was not an eligible customer-generator. If those same customer-generators are net generators over a billing period, the net kilowatthours generated shall be valued at the same price per kilowatthour as the electric utility would charge for the baseline quantity of electricity during that billing period, and, if the number of kilowatthours generated exceeds the baseline quantity, the excess shall be valued at the same price per kilowatthour as the electric utility would charge for electricity over the baseline quantity during that billing period.
(B)For all eligible customer-generators taking service under contracts or tariffs employing time-of-use rates, any net monthly consumption of electricity shall be calculated according to the terms of the contract or tariff to which the same customer would be assigned, or be eligible for, if the customer was not an eligible customer-generator. When those same customer-generators are net generators during any discrete time-of-use period, the net kilowatthours produced shall be valued at the same price per kilowatthour as the electric utility would charge for retail kilowatthour sales during that same time-of-use period. If the eligible customer-generators time-of-use electrical meter is unable to measure the flow of electricity in two directions, paragraph (1) of subdivision (c) shall apply.
(C)For all eligible residential and small commercial customer-generators and for each billing period, the net balance of moneys owed to the electric utility for net consumption of electricity or credits owed to the eligible customer-generator for net generation of electricity shall be carried forward as a monetary value until the end of each 12-month period. For all eligible commercial, industrial, and agricultural customer-generators, the net balance of moneys owed shall be paid in accordance with the electric utilitys normal billing cycle, except that if the eligible commercial, industrial, or agricultural customer-generator is a net electricity producer over a normal billing cycle, any excess kilowatthours generated during the billing cycle shall be carried over to the following billing period as a monetary value, calculated according to the procedures set forth in this section, and appear as a credit on the eligible commercial, industrial, or agricultural customer-generators account, until the end of the annual period when paragraph (3) shall apply.
(3)At the end of each 12-month period, where the electricity generated by the eligible customer-generator during the 12-month period exceeds the electricity supplied by the electric utility during that same period, the eligible customer-generator is a net surplus customer-generator and the electric utility, upon an affirmative election by the net surplus customer-generator, shall either (A) provide net surplus electricity compensation for any net surplus electricity generated during the prior 12-month period, or (B) allow the net surplus customer-generator to apply the net surplus electricity as a credit for kilowatthours subsequently supplied by the electric utility to the net surplus customer-generator. For an eligible customer-generator that does not affirmatively elect to receive service pursuant to net surplus electricity compensation, the electric utility shall retain any excess kilowatthours generated during the prior 12-month period. The eligible customer-generator not affirmatively electing to receive service pursuant to net surplus electricity compensation shall not be owed any compensation for the net surplus electricity unless the electric utility enters into a purchase agreement with the eligible customer-generator for those excess kilowatthours. Every electric utility shall provide notice to eligible customer-generators that they are eligible to receive net surplus electricity compensation for net surplus electricity, that they must elect to receive net surplus electricity compensation, and that the 12-month period commences when the electric utility receives the eligible customer-generators election. For an electric utility that is an electrical corporation or electrical cooperative, the commission may adopt requirements for providing notice and the manner by which eligible customer-generators may elect to receive net surplus electricity compensation.
(4)(A)An eligible customer-generator with multiple meters may elect to aggregate the electrical load of the meters located on the property where the renewable electrical generation facility is located and on all property adjacent or contiguous to the property on which the renewable electrical generation facility is located, if those properties are solely owned, leased, or rented by the eligible customer-generator. If the eligible customer-generator elects to aggregate the electric load pursuant to this paragraph, the electric utility shall use the aggregated load for the purpose of determining whether an eligible customer-generator is a net consumer or a net surplus customer-generator during a 12-month period.
(B)If an eligible customer-generator chooses to aggregate pursuant to subparagraph (A), the eligible customer-generator shall be permanently ineligible to receive net surplus electricity compensation, and the electric utility shall retain any kilowatthours in excess of the eligible customer-generators aggregated electrical load generated during the 12-month period.
(C)If an eligible customer-generator with multiple meters elects to aggregate the electrical load of those meters pursuant to subparagraph (A), and different rate schedules are applicable to service at any of those meters, the electricity generated by the renewable electrical generation facility shall be allocated to each of the meters in proportion to the electrical load served by those meters. For example, if the eligible customer-generator receives electric service through three meters, two meters being at an agricultural rate that each provide service to 25 percent of the customers total load, and a third meter, at a commercial rate, that provides service to 50 percent of the customers total load, then 50 percent of the electrical generation of the eligible renewable generation facility shall be allocated to the third meter that provides service at the commercial rate and 25 percent of the generation shall be allocated to each of the two meters providing service at the agricultural rate. This proportionate allocation shall be computed each billing period.
(D)This paragraph shall not become operative for an electrical corporation unless the commission determines that allowing eligible customer-generators to aggregate their load from multiple meters will not result in an increase in the expected revenue obligations of customers who are not eligible customer-generators. The commission shall make this determination by September 30, 2013. In making this determination, the commission shall determine if there are any public purpose or other noncommodity charges that the eligible customer-generators would pay pursuant to the net energy metering program as it exists prior to aggregation, that the eligible customer-generator would not pay if permitted to aggregate the electrical load of multiple meters pursuant to this paragraph.
(E)A local publicly owned electric utility or electrical cooperative shall only allow eligible customer-generators to aggregate their load if the utilitys ratemaking authority determines that allowing eligible customer-generators to aggregate their load from multiple meters will not result in an increase in the expected revenue obligations of customers that are not eligible customer-generators. The ratemaking authority of a local publicly owned electric utility or electrical cooperative shall make this determination within 180 days of the first request made by an eligible customer-generator to aggregate their load. In making the determination, the ratemaking authority shall determine if there are any public purpose or other noncommodity charges that the eligible customer-generator would pay pursuant to the net energy metering or coenergy metering program of the utility as it exists before aggregation, that the eligible customer-generator would not pay if permitted to aggregate the electrical load of multiple meters pursuant to this paragraph. If the ratemaking authority determines that load aggregation will not cause an incremental rate impact on the utilitys customers that are not eligible customer-generators, the local publicly owned electric utility or electrical cooperative shall permit an eligible customer-generator to elect to aggregate the electrical load of multiple meters pursuant to this paragraph. The ratemaking authority may reconsider any determination made pursuant to this subparagraph in a subsequent public proceeding.
(F)For purposes of this paragraph, parcels that are divided by a street, highway, or public thoroughfare are considered contiguous, provided they are otherwise contiguous and under the same ownership.
(G)An eligible customer-generator may only elect to aggregate the electrical load of multiple meters if the renewable electrical generation facility, or a combination of those facilities, has a total generating capacity of not more than one megawatt.
(H)Notwithstanding subdivision (g), an eligible customer-generator electing to aggregate the electrical load of multiple meters pursuant to this subdivision shall remit service charges for the cost of providing billing services to the electric utility that provides service to the meters.
(I)The commission shall ensure that logistics businesses and manufacturing businesses are eligible customer-generators for purposes of this paragraph, if the commission elects to extend the program pursuant to this paragraph.
(5)(A)The ratemaking authority shall establish a net surplus electricity compensation valuation to compensate the net surplus customer-generator for the value of net surplus electricity generated by the net surplus customer-generator. The commission shall establish the valuation in a ratemaking proceeding. The ratemaking authority for a local publicly owned electric utility shall establish the valuation in a public proceeding. The net surplus electricity compensation valuation shall be established so as to provide the net surplus customer-generator just and reasonable compensation for the value of net surplus electricity, while leaving other ratepayers unaffected. The ratemaking authority shall determine whether the compensation will include, where appropriate justification exists, either or both of the following components:
(i)The value of the electricity itself.
(ii)The value of the renewable attributes of the electricity.
(B)In establishing the rate pursuant to subparagraph (A), the ratemaking authority shall ensure that the rate does not result in a shifting of costs between eligible customer-generators and other bundled service customers.
(6)(A)Upon adoption of the net surplus electricity compensation rate by the ratemaking authority, any renewable energy credit, as defined in Section 399.12, for net surplus electricity purchased by the electric utility shall belong to the electric utility. Any renewable energy credit associated with electricity generated by the eligible customer-generator that is used by the eligible customer-generator shall remain the property of the eligible customer-generator.
(B)Upon adoption of the net surplus electricity compensation rate by the ratemaking authority, the net surplus electricity purchased by the electric utility shall count toward the electric utilitys renewables portfolio standard annual procurement targets for the purposes of paragraph (1) of subdivision (b) of Section 399.15, or for a local publicly owned electric utility, the renewables portfolio standard annual procurement targets established pursuant to Section 399.30.
(7)The electric utility shall provide every eligible residential or small commercial customer-generator with net electricity consumption and net surplus electricity generation information with each regular bill. That information shall include the current monetary balance owed the electric utility for net electricity consumed, or the net surplus electricity generated, since the last 12-month period ended. Notwithstanding this subdivision, an electric utility shall permit that customer to pay monthly for net energy consumed.
(8)If an eligible residential or small commercial customer-generator terminates the customer relationship with the electric utility, the electric utility shall reconcile the eligible customer-generators consumption and production of electricity during any part of a 12-month period following the last reconciliation, according to the requirements set forth in this subdivision, except that those requirements shall apply only to the months since the most recent 12-month bill.
(9)If an electric service provider or electric utility providing net energy metering to a residential or small commercial customer-generator ceases providing that electric service to that customer during any 12-month period, and the customer-generator enters into a new net energy metering contract or tariff with a new electric service provider or electric utility, the 12-month period, with respect to that new electric service provider or electric utility, shall commence on the date on which the new electric service provider or electric utility first supplies electric service to the customer-generator.
(i)Notwithstanding any other provision of this section, paragraphs (1), (2), and (3) shall apply to an eligible customer-generator with a capacity of more than 10 kilowatts, but not exceeding one megawatt, that receives electric service from a local publicly owned electric utility that has elected to use a coenergy metering program unless the local publicly owned electric utility chooses to provide service for eligible customer-generators with a capacity of more than 10 kilowatts in accordance with subdivisions (g) and (h):
(1)The eligible customer-generator shall be required to use a meter, or multiple meters, capable of separately measuring electricity flow in both directions. All meters shall provide time-of-use measurements of electricity flow, and the customer shall take service on a time-of-use rate schedule. If the existing meter of the eligible customer-generator is not a time-of-use meter or is not capable of measuring total flow of electricity in both directions, the eligible customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is both time-of-use and able to measure total electricity flow in both directions. This subdivision shall not restrict the ability of an eligible customer-generator to use any economic incentives provided by a governmental agency or an electric utility to reduce its costs for purchasing and installing a time-of-use meter.
(2)The consumption of electricity from the local publicly owned electric utility shall result in a cost to the eligible customer-generator to be priced in accordance with the standard rate charged to the eligible customer-generator in accordance with the rate structure to which the customer would be assigned if the customer did not use a renewable electrical generation facility. The generation of electricity provided to the local publicly owned electric utility shall result in a credit to the eligible customer-generator and shall be priced in accordance with the generation component, established under the applicable structure to which the customer would be assigned if the customer did not use a renewable electrical generation facility.
(3)All costs and credits shall be shown on the eligible customer-generators bill for each billing period. In any months in which the eligible customer-generator has been a net consumer of electricity calculated on the basis of value determined pursuant to paragraph (2), the customer-generator shall owe to the local publicly owned electric utility the balance of electricity costs and credits during that billing period. In any billing period in which the eligible customer-generator has been a net producer of electricity calculated on the basis of value determined pursuant to paragraph (2), the local publicly owned electric utility shall owe to the eligible customer-generator the balance of electricity costs and credits during that billing period. Any net credit to the eligible customer-generator of electricity costs may be carried forward to subsequent billing periods, provided that a local publicly owned electric utility may choose to carry the credit over as a kilowatthour credit consistent with the provisions of any applicable contract or tariff, including any differences attributable to the time of generation of the electricity. At the end of each 12-month period, the local publicly owned electric utility may reduce any net credit due to the eligible customer-generator to zero.
(j)A renewable electrical generation facility used by an eligible customer-generator shall meet all applicable safety and performance standards established by the National Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories, including Underwriters Laboratories Incorporated and, where applicable, rules of the commission regarding safety and reliability. A customer-generator whose renewable electrical generation facility meets those standards and rules shall not be required to install additional controls, perform or pay for additional tests, or purchase additional liability insurance.
(k)If the commission determines that there are cost or revenue obligations for an electrical corporation that may not be recovered from customer-generators acting pursuant to this section, those obligations shall remain within the customer class from which any shortfall occurred and shall not be shifted to any other customer class. Net energy metering and coenergy metering customers shall not be exempt from the public goods charges imposed pursuant to Article 7 (commencing with Section 381), Article 8 (commencing with Section 385), or Article 15 (commencing with Section 399) of Chapter 2.3 of Part 1.
(l)A net energy metering, coenergy metering, or wind energy cometering customer shall reimburse the Department of Water Resources for all charges that would otherwise be imposed on the customer by the commission to recover bond-related costs pursuant to an agreement between the commission and the Department of Water Resources pursuant to Section 80110 of the Water Code, and the costs of the department equal to the share of the departments estimated net unavoidable power purchase contract costs attributable to the customer. The commission shall incorporate the determination into an existing proceeding before the commission, and shall ensure that the charges are nonbypassable. Until the commission has made a determination regarding the nonbypassable charges, net energy metering, coenergy metering, and wind energy cometering shall continue under the same rules, procedures, terms, and conditions as were applicable on December 31, 2002.
(m)In implementing the requirements of subdivisions (k) and (l), an eligible customer-generator shall not be required to replace its existing meter except as set forth in paragraph (1) of subdivision (c), and the electric utility shall not require additional measurement of usage beyond that which is necessary for customers in the same rate class as the eligible customer-generator.
(n)It is the intent of the Legislature that the Treasurer incorporate net energy metering, including net surplus electricity compensation, coenergy metering, and wind energy cometering projects undertaken pursuant to this section as sustainable building methods or distributive energy technologies for purposes of evaluating low-income housing projects.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares that a program to provide net energy metering combined with net surplus compensation, coenergy metering, and wind energy cometering for eligible customer-generators is one way to encourage substantial private investment in renewable energy resources, stimulate in-state economic growth, reduce demand for electricity during peak consumption periods, help stabilize Californias energy supply infrastructure, enhance the continued diversification of Californias energy resource mix, reduce interconnection and administrative costs for electricity suppliers, and encourage conservation and efficiency.
(b)As used in this section, the following terms have the following meanings:
(1)Coenergy metering means a program that is the same in all other respects as a net energy metering program, except that the local publicly owned electric utility has elected to apply a generation-to-generation energy and time-of-use credit formula as provided in subdivision (i).
(2)Electrical cooperative means an electrical cooperative as defined in Section 2776.
(3)Electric utility means an electrical corporation, a local publicly owned electric utility, or an electrical cooperative, or any other entity, except an electric service provider, that offers electrical service. This section shall not apply to a local publicly owned electric utility that serves more than 750,000 customers and that also conveys water to its customers.
(4)(A)Eligible customer-generator means a residential customer, small commercial customer as defined in subdivision (h) of Section 331, or commercial, industrial, or agricultural customer of an electric utility, who uses a renewable electrical generation facility, or a combination of those facilities, with a total capacity of not more than one megawatt, that is located on the customers owned, leased, or rented premises, and is interconnected and operates in parallel with the electrical grid, and is intended primarily to offset part or all of the customers own electrical requirements.
(B)(i)Notwithstanding subparagraph (A), eligible customer-generator includes the Department of Corrections and Rehabilitation using a renewable electrical generation technology, or a combination of renewable electrical generation technologies, with a total capacity of not more than eight megawatts, that is located on the departments owned, leased, or rented premises, is interconnected and operates in parallel with the electrical grid, and is intended primarily to offset part or all of the facilitys own electrical requirements. The amount of any wind generation exported to the electrical grid shall not exceed 1.35 megawatt at any time.
(ii)Notwithstanding paragraph (2) of subdivision (e), an electrical corporation shall be afforded a prudent but necessary time, as determined by the executive director of the commission, to study the impacts of a request for interconnection of a renewable generator with a capacity of greater than one megawatt under this subparagraph. If the study reveals the need for upgrades to the transmission or distribution system arising solely from the interconnection, the electrical corporation shall be afforded the time necessary to complete those upgrades before the interconnection and those costs shall be borne by the customer-generator. Upgrade projects shall comply with applicable state and federal requirements, including requirements of the Federal Energy Regulatory Commission.
(C)(i)For purposes of this subparagraph, a United States Armed Forces base or facility is an establishment under the jurisdiction of the United States Army, Navy, Air Force, Marine Corps, Space Force, or Coast Guard.
(ii)Notwithstanding subparagraph (A), a United States Armed Forces base or facility is an eligible customer-generator if the base or facility uses a renewable electrical generation facility, or a combination of those facilities, the renewable electrical generation facility is located on premises owned, leased, or rented by the United States Armed Forces base or facility, the renewable electrical generation facility is interconnected and operates in parallel with the electrical grid, the renewable electrical generation facility is intended primarily to offset part or all of the base or facilitys own electrical requirements, and the renewable electrical generation facility has a generating capacity that does not exceed the lesser of 12 megawatts or one megawatt greater than the minimum load of the base or facility over the prior 36 months. Unless prohibited by federal law, a renewable electrical generation facility shall not be eligible for net energy metering for privatized military housing pursuant to this subparagraph if the renewable electrical generation facility was procured using a sole source process. A renewable electrical generation facility procured using best value criteria, if otherwise eligible, may be used for net energy metering for privatized military housing pursuant to this subparagraph. For these purposes, best value criteria means a value determined by objective criteria and may include, but is not limited to, price, features, functions, and life-cycle costs.
(iii)A United States Armed Forces base or facility that is an eligible customer generator pursuant to this subparagraph shall not receive compensation for exported generation.
(iv)Notwithstanding paragraph (2) of subdivision (e), an electrical corporation shall be afforded a prudent but necessary time, as determined by the executive director of the commission but not less than 60 working days, to study the impacts of a request for interconnection of a renewable electrical generation facility with a capacity of greater than one megawatt pursuant to this subparagraph. If the study reveals the need for upgrades to the transmission or distribution system arising solely from the interconnection, the electrical corporation shall be afforded the time necessary to complete those upgrades before the interconnection and the costs of those upgrades shall be borne by the eligible customer-generator. Upgrade projects shall comply with applicable state and federal requirements, including requirements of the Federal Energy Regulatory Commission. For a renewable generation facility that interconnects directly to the transmission grid or that requires transmission upgrades, the United States Armed Forces base or facility shall comply with all Federal Energy Regulatory Commission interconnection procedures and requirements.
(v)An electrical corporation shall make a tariff, as approved by the commission, available pursuant to this subparagraph by November 1, 2015.
(vi)This subparagraph shall not apply to a tariff made available pursuant to Section 2827.1.
(5)Large electrical corporation means an electrical corporation with more than 100,000 service connections in California.
(6)Net energy metering means measuring the difference between the electricity supplied through the electrical grid and the electricity generated by an eligible customer-generator and fed back to the electrical grid over a 12-month period as described in subdivisions (c) and (h).
(7)Net surplus customer-generator means an eligible customer-generator that generates more electricity during a 12-month period than is supplied by the electric utility to the eligible customer-generator during the same 12-month period.
(8)Net surplus electricity means all electricity generated by an eligible customer-generator measured in kilowatthours over a 12-month period that exceeds the amount of electricity consumed by that eligible customer-generator.
(9)Net surplus electricity compensation means a per kilowatthour rate offered by the electric utility to the net surplus customer-generator for net surplus electricity that is set by the ratemaking authority pursuant to subdivision (h).
(10)Ratemaking authority means, for an electrical corporation, the commission, for an electrical cooperative, its ratesetting body selected by its shareholders or members, and for a local publicly owned electric utility, the local elected body responsible for setting the rates of the local publicly owned utility.
(11)Renewable electrical generation facility means a facility that generates electricity from a renewable source listed in paragraph (1) of subdivision (a) of Section 25741 of the Public Resources Code. A small hydroelectric generation facility is not an eligible renewable electrical generation facility if it will cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(12)Wind energy cometering means any wind energy project greater than 50 kilowatts, but not exceeding one megawatt, where the difference between the electricity supplied through the electrical grid and the electricity generated by an eligible customer-generator and fed back to the electrical grid over a 12-month period is as described in subdivision (h). Wind energy cometering shall be accomplished pursuant to Section 2827.8.
(c)(1)Except as provided in paragraph (4) and in Section 2827.1, every electric utility shall develop a standard contract or tariff providing for net energy metering, and shall make this standard contract or tariff available to eligible customer-generators, upon request, on a first-come-first-served basis until the time that the total rated generating capacity used by eligible customer-generators exceeds 5 percent of the electric utilitys aggregate customer peak demand. Net energy metering shall be accomplished using a single meter capable of registering the flow of electricity in two directions. An additional meter or meters to monitor the flow of electricity in each direction may be installed with the consent of the eligible customer-generator, at the expense of the electric utility, and the additional metering shall be used only to provide the information necessary to accurately bill or credit the eligible customer-generator pursuant to subdivision (h), or to collect generating system performance information for research purposes relative to a renewable electrical generation facility. If the existing electrical meter of an eligible customer-generator is not capable of measuring the flow of electricity in two directions, the eligible customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is able to measure electricity flow in two directions. If an additional meter or meters are installed, the net energy metering calculation shall yield a result identical to that of a single meter. An eligible customer-generator that is receiving service other than through the standard contract or tariff may elect to receive service through the standard contract or tariff until the electric utility reaches the generation limit set forth in this paragraph. Once the generation limit is reached, only eligible customer-generators that had previously elected to receive service pursuant to the standard contract or tariff have a right to continue to receive service pursuant to the standard contract or tariff. Eligibility for net energy metering does not limit an eligible customer-generators eligibility for any other rebate, incentive, or credit provided by the electric utility, or pursuant to any governmental program, including rebates and incentives provided pursuant to the California Solar Initiative.
(2)An electrical corporation shall include a provision in the net energy metering contract or tariff requiring that any customer with an existing electrical generating facility and meter who enters into a new net energy metering contract shall provide an inspection report to the electrical corporation, unless the electrical generating facility and meter have been installed or inspected within the previous three years. The inspection report shall be prepared by a California licensed contractor who is not the owner or operator of the facility and meter. A California licensed electrician shall perform the inspection of the electrical portion of the facility and meter.
(3)(A)On an annual basis, every electric utility shall make available to the ratemaking authority information on the total rated generating capacity used by eligible customer-generators that are customers of that provider in the providers service area and the net surplus electricity purchased by the electric utility pursuant to this section.
(B)An electric service provider operating pursuant to Section 394 shall make available to the ratemaking authority the information required by this paragraph for each eligible customer-generator that is their customer for each service area of an electrical corporation, local publicly owned electrical utility, or electrical cooperative, in which the eligible customer-generator has net energy metering.
(C)The ratemaking authority shall develop a process for making the information required by this paragraph available to electric utilities, and for using that information to determine when, pursuant to paragraphs (1) and (4), an electric utility is not obligated to provide net energy metering to additional eligible customer-generators in its service area.
(4)(A)An electric utility that is not a large electrical corporation is not obligated to provide net energy metering to additional eligible customer-generators in its service area when the combined total peak demand of all electricity used by eligible customer-generators served by all the electric utilities in that service area furnishing net energy metering to eligible customer-generators exceeds 5 percent of the aggregate customer peak demand of those electric utilities.
(B)The commission shall require every large electrical corporation to make the standard contract or tariff available to eligible customer-generators, continuously and without interruption, until such times as the large electrical corporation reaches its net energy metering program limit or July 1, 2017, whichever is earlier. A large electrical corporation reaches its program limit when the combined total peak demand of all electricity used by eligible customer-generators served by all the electric utilities in the large electrical corporations service area furnishing net energy metering to eligible customer-generators exceeds 5 percent of the aggregate customer peak demand of those electric utilities. For purposes of calculating a large electrical corporations program limit, aggregate customer peak demand means the highest sum of the noncoincident peak demands of all of the large electrical corporations customers that occurs in any calendar year. To determine the aggregate customer peak demand, every large electrical corporation shall use a uniform method approved by the commission. The program limit calculated pursuant to this paragraph shall not be less than the following:
(i)For San Diego Gas and Electric Company, when it has made 607 megawatts of nameplate generating capacity available to eligible customer-generators.
(ii)For Southern California Edison Company, when it has made 2,240 megawatts of nameplate generating capacity available to eligible customer-generators.
(iii)For Pacific Gas and Electric Company, when it has made 2,409 megawatts of nameplate generating capacity available to eligible customer-generators.
(C)Every large electrical corporation shall file a monthly report with the commission detailing the progress toward the net energy metering program limit established in subparagraph (B). The report shall include separate calculations on progress toward the limits based on operating solar energy systems, cumulative numbers of interconnection requests for net energy metering eligible systems, and any other criteria required by the commission.
(D)Beginning July 1, 2017, or upon reaching the net metering program limit of subparagraph (B), whichever is earlier, the obligation of a large electrical corporation to provide service pursuant to a standard contract or tariff shall be pursuant to Section 2827.1 and applicable state and federal requirements.
(d)Every electric utility shall make all necessary forms and contracts for net energy metering and net surplus electricity compensation service available for download from the internet.
(e)(1)Every electric utility shall ensure that requests for establishment of net energy metering and net surplus electricity compensation are processed in a time period not exceeding that for similarly situated customers requesting new electric service, but not to exceed 30 working days from the date it receives a completed application form for net energy metering service or net surplus electricity compensation, including a signed interconnection agreement from an eligible customer-generator and the electric inspection clearance from the governmental authority having jurisdiction.
(2)Every electric utility shall ensure that requests for an interconnection agreement from an eligible customer-generator are processed in a time period not to exceed 30 working days from the date it receives a completed application form from the eligible customer-generator for an interconnection agreement.
(3)If an electric utility is unable to process a request within the allowable timeframe pursuant to paragraph (1) or (2), it shall notify the eligible customer-generator and the ratemaking authority of the reason for its inability to process the request and the expected completion date.
(f)(1)If a customer participates in direct transactions pursuant to paragraph (1) of subdivision (b) of Section 365, or Section 365.1, with an electric service provider that does not provide distribution service for the direct transactions, the electric utility that provides distribution service for the eligible customer-generator is not obligated to provide net energy metering or net surplus electricity compensation to the customer.
(2)If a customer participates in direct transactions pursuant to paragraph (1) of subdivision (b) of Section 365 or 365.1 with an electric service provider, and the customer is an eligible customer-generator, the electric utility that provides distribution service for the direct transactions may recover from the customers electric service provider the incremental costs of metering and billing service related to net energy metering and net surplus electricity compensation in an amount set by the ratemaking authority.
(g)Except for the time-variant kilowatthour pricing portion of any tariff adopted by the commission pursuant to paragraph (4) of subdivision (a) of Section 2851, each net energy metering contract or tariff shall be identical, with respect to rate structure, all retail rate components, and any monthly charges, to the contract or tariff to which the same customer would be assigned if the customer did not use a renewable electrical generation facility, except that eligible customer-generators shall not be assessed standby charges on the electrical generating capacity or the kilowatthour production of a renewable electrical generation facility. The charges for all retail rate components for eligible customer-generators shall be based exclusively on the customer-generators net kilowatthour consumption over a 12-month period, without regard to the eligible customer-generators choice as to from whom it purchases electricity that is not self-generated. Any new or additional demand charge, standby charge, customer charge, minimum monthly charge, interconnection charge, or any other charge that would increase an eligible customer-generators costs beyond those of other customers who are not eligible customer-generators in the rate class to which the eligible customer-generator would otherwise be assigned if the customer did not own, lease, rent, or otherwise operate a renewable electrical generation facility is contrary to the intent of this section, and shall not form a part of net energy metering contracts or tariffs.
(h)For eligible customer-generators, the net energy metering calculation shall be made by measuring the difference between the electricity supplied to the eligible customer-generator and the electricity generated by the eligible customer-generator and fed back to the electrical grid over a 12-month period. The following rules shall apply to the annualized net metering calculation:
(1)The eligible residential or small commercial customer-generator, at the end of each 12-month period following the date of final interconnection of the eligible customer-generators system with an electric utility, and at each anniversary date thereafter, shall be billed for electricity used during that 12-month period. The electric utility shall determine if the eligible residential or small commercial customer-generator was a net consumer or a net surplus customer-generator during that period.
(2)At the end of each 12-month period, where the electricity supplied during the period by the electric utility exceeds the electricity generated by the eligible residential or small commercial customer-generator during that same period, the eligible residential or small commercial customer-generator is a net electricity consumer and the electric utility shall be owed compensation for the eligible customer-generators net kilowatthour consumption over that 12-month period. The compensation owed for the eligible residential or small commercial customer-generators consumption shall be calculated as follows:
(A)For all eligible customer-generators taking service under contracts or tariffs employing baseline and over baseline rates, any net monthly consumption of electricity shall be calculated according to the terms of the contract or tariff to which the same customer would be assigned to, or be eligible for, if the customer was not an eligible customer-generator. If those same customer-generators are net generators over a billing period, the net kilowatthours generated shall be valued at the same price per kilowatthour as the electric utility would charge for the baseline quantity of electricity during that billing period, and, if the number of kilowatthours generated exceeds the baseline quantity, the excess shall be valued at the same price per kilowatthour as the electric utility would charge for electricity over the baseline quantity during that billing period.
(B)For all eligible customer-generators taking service under contracts or tariffs employing time-of-use rates, any net monthly consumption of electricity shall be calculated according to the terms of the contract or tariff to which the same customer would be assigned, or be eligible for, if the customer was not an eligible customer-generator. When those same customer-generators are net generators during any discrete time-of-use period, the net kilowatthours produced shall be valued at the same price per kilowatthour as the electric utility would charge for retail kilowatthour sales during that same time-of-use period. If the eligible customer-generators time-of-use electrical meter is unable to measure the flow of electricity in two directions, paragraph (1) of subdivision (c) shall apply.
(C)For all eligible residential and small commercial customer-generators and for each billing period, the net balance of moneys owed to the electric utility for net consumption of electricity or credits owed to the eligible customer-generator for net generation of electricity shall be carried forward as a monetary value until the end of each 12-month period. For all eligible commercial, industrial, and agricultural customer-generators, the net balance of moneys owed shall be paid in accordance with the electric utilitys normal billing cycle, except that if the eligible commercial, industrial, or agricultural customer-generator is a net electricity producer over a normal billing cycle, any excess kilowatthours generated during the billing cycle shall be carried over to the following billing period as a monetary value, calculated according to the procedures set forth in this section, and appear as a credit on the eligible commercial, industrial, or agricultural customer-generators account, until the end of the annual period when paragraph (3) shall apply.
(3)At the end of each 12-month period, where the electricity generated by the eligible customer-generator during the 12-month period exceeds the electricity supplied by the electric utility during that same period, the eligible customer-generator is a net surplus customer-generator and the electric utility, upon an affirmative election by the net surplus customer-generator, shall either (A) provide net surplus electricity compensation for any net surplus electricity generated during the prior 12-month period, or (B) allow the net surplus customer-generator to apply the net surplus electricity as a credit for kilowatthours subsequently supplied by the electric utility to the net surplus customer-generator. For an eligible customer-generator that does not affirmatively elect to receive service pursuant to net surplus electricity compensation, the electric utility shall retain any excess kilowatthours generated during the prior 12-month period. The eligible customer-generator not affirmatively electing to receive service pursuant to net surplus electricity compensation shall not be owed any compensation for the net surplus electricity unless the electric utility enters into a purchase agreement with the eligible customer-generator for those excess kilowatthours. Every electric utility shall provide notice to eligible customer-generators that they are eligible to receive net surplus electricity compensation for net surplus electricity, that they must elect to receive net surplus electricity compensation, and that the 12-month period commences when the electric utility receives the eligible customer-generators election. For an electric utility that is an electrical corporation or electrical cooperative, the commission may adopt requirements for providing notice and the manner by which eligible customer-generators may elect to receive net surplus electricity compensation.
(4)(A)An eligible customer-generator with multiple meters may elect to aggregate the electrical load of the meters located on the property where the renewable electrical generation facility is located and on all property adjacent or contiguous to the property on which the renewable electrical generation facility is located, if those properties are solely owned, leased, or rented by the eligible customer-generator. If the eligible customer-generator elects to aggregate the electric load pursuant to this paragraph, the electric utility shall use the aggregated load for the purpose of determining whether an eligible customer-generator is a net consumer or a net surplus customer-generator during a 12-month period.
(B)If an eligible customer-generator chooses to aggregate pursuant to subparagraph (A), the eligible customer-generator shall be permanently ineligible to receive net surplus electricity compensation, and the electric utility shall retain any kilowatthours in excess of the eligible customer-generators aggregated electrical load generated during the 12-month period.
(C)If an eligible customer-generator with multiple meters elects to aggregate the electrical load of those meters pursuant to subparagraph (A), and different rate schedules are applicable to service at any of those meters, the electricity generated by the renewable electrical generation facility shall be allocated to each of the meters in proportion to the electrical load served by those meters. For example, if the eligible customer-generator receives electric service through three meters, two meters being at an agricultural rate that each provide service to 25 percent of the customers total load, and a third meter, at a commercial rate, that provides service to 50 percent of the customers total load, then 50 percent of the electrical generation of the eligible renewable generation facility shall be allocated to the third meter that provides service at the commercial rate and 25 percent of the generation shall be allocated to each of the two meters providing service at the agricultural rate. This proportionate allocation shall be computed each billing period.
(D)This paragraph shall not become operative for an electrical corporation unless the commission determines that allowing eligible customer-generators to aggregate their load from multiple meters will not result in an increase in the expected revenue obligations of customers who are not eligible customer-generators. The commission shall make this determination by September 30, 2013. In making this determination, the commission shall determine if there are any public purpose or other noncommodity charges that the eligible customer-generators would pay pursuant to the net energy metering program as it exists prior to aggregation, that the eligible customer-generator would not pay if permitted to aggregate the electrical load of multiple meters pursuant to this paragraph.
(E)A local publicly owned electric utility or electrical cooperative shall only allow eligible customer-generators to aggregate their load if the utilitys ratemaking authority determines that allowing eligible customer-generators to aggregate their load from multiple meters will not result in an increase in the expected revenue obligations of customers that are not eligible customer-generators. The ratemaking authority of a local publicly owned electric utility or electrical cooperative shall make this determination within 180 days of the first request made by an eligible customer-generator to aggregate their load. In making the determination, the ratemaking authority shall determine if there are any public purpose or other noncommodity charges that the eligible customer-generator would pay pursuant to the net energy metering or coenergy metering program of the utility as it exists before aggregation, that the eligible customer-generator would not pay if permitted to aggregate the electrical load of multiple meters pursuant to this paragraph. If the ratemaking authority determines that load aggregation will not cause an incremental rate impact on the utilitys customers that are not eligible customer-generators, the local publicly owned electric utility or electrical cooperative shall permit an eligible customer-generator to elect to aggregate the electrical load of multiple meters pursuant to this paragraph. The ratemaking authority may reconsider any determination made pursuant to this subparagraph in a subsequent public proceeding.
(F)For purposes of this paragraph, parcels that are divided by a street, highway, or public thoroughfare are considered contiguous, provided they are otherwise contiguous and under the same ownership.
(G)An eligible customer-generator may only elect to aggregate the electrical load of multiple meters if the renewable electrical generation facility, or a combination of those facilities, has a total generating capacity of not more than one megawatt.
(H)Notwithstanding subdivision (g), an eligible customer-generator electing to aggregate the electrical load of multiple meters pursuant to this subdivision shall remit service charges for the cost of providing billing services to the electric utility that provides service to the meters.
(I)The commission shall ensure that logistics businesses and manufacturing businesses are eligible customer-generators for purposes of this paragraph, if the commission elects to extend the program pursuant to this paragraph.
(5)(A)The ratemaking authority shall establish a net surplus electricity compensation valuation to compensate the net surplus customer-generator for the value of net surplus electricity generated by the net surplus customer-generator. The commission shall establish the valuation in a ratemaking proceeding. The ratemaking authority for a local publicly owned electric utility shall establish the valuation in a public proceeding. The net surplus electricity compensation valuation shall be established so as to provide the net surplus customer-generator just and reasonable compensation for the value of net surplus electricity, while leaving other ratepayers unaffected. The ratemaking authority shall determine whether the compensation will include, where appropriate justification exists, either or both of the following components:
(i)The value of the electricity itself.
(ii)The value of the renewable attributes of the electricity.
(B)In establishing the rate pursuant to subparagraph (A), the ratemaking authority shall ensure that the rate does not result in a shifting of costs between eligible customer-generators and other bundled service customers.
(6)(A)Upon adoption of the net surplus electricity compensation rate by the ratemaking authority, any renewable energy credit, as defined in Section 399.12, for net surplus electricity purchased by the electric utility shall belong to the electric utility. Any renewable energy credit associated with electricity generated by the eligible customer-generator that is used by the eligible customer-generator shall remain the property of the eligible customer-generator.
(B)Upon adoption of the net surplus electricity compensation rate by the ratemaking authority, the net surplus electricity purchased by the electric utility shall count toward the electric utilitys renewables portfolio standard annual procurement targets for the purposes of paragraph (1) of subdivision (b) of Section 399.15, or for a local publicly owned electric utility, the renewables portfolio standard annual procurement targets established pursuant to Section 399.30.
(7)The electric utility shall provide every eligible residential or small commercial customer-generator with net electricity consumption and net surplus electricity generation information with each regular bill. That information shall include the current monetary balance owed the electric utility for net electricity consumed, or the net surplus electricity generated, since the last 12-month period ended. Notwithstanding this subdivision, an electric utility shall permit that customer to pay monthly for net energy consumed.
(8)If an eligible residential or small commercial customer-generator terminates the customer relationship with the electric utility, the electric utility shall reconcile the eligible customer-generators consumption and production of electricity during any part of a 12-month period following the last reconciliation, according to the requirements set forth in this subdivision, except that those requirements shall apply only to the months since the most recent 12-month bill.
(9)If an electric service provider or electric utility providing net energy metering to a residential or small commercial customer-generator ceases providing that electric service to that customer during any 12-month period, and the customer-generator enters into a new net energy metering contract or tariff with a new electric service provider or electric utility, the 12-month period, with respect to that new electric service provider or electric utility, shall commence on the date on which the new electric service provider or electric utility first supplies electric service to the customer-generator.
(i)Notwithstanding any other provision of this section, paragraphs (1), (2), and (3) shall apply to an eligible customer-generator with a capacity of more than 10 kilowatts, but not exceeding one megawatt, that receives electric service from a local publicly owned electric utility that has elected to use a coenergy metering program unless the local publicly owned electric utility chooses to provide service for eligible customer-generators with a capacity of more than 10 kilowatts in accordance with subdivisions (g) and (h):
(1)The eligible customer-generator shall be required to use a meter, or multiple meters, capable of separately measuring electricity flow in both directions. All meters shall provide time-of-use measurements of electricity flow, and the customer shall take service on a time-of-use rate schedule. If the existing meter of the eligible customer-generator is not a time-of-use meter or is not capable of measuring total flow of electricity in both directions, the eligible customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is both time-of-use and able to measure total electricity flow in both directions. This subdivision shall not restrict the ability of an eligible customer-generator to use any economic incentives provided by a governmental agency or an electric utility to reduce its costs for purchasing and installing a time-of-use meter.
(2)The consumption of electricity from the local publicly owned electric utility shall result in a cost to the eligible customer-generator to be priced in accordance with the standard rate charged to the eligible customer-generator in accordance with the rate structure to which the customer would be assigned if the customer did not use a renewable electrical generation facility. The generation of electricity provided to the local publicly owned electric utility shall result in a credit to the eligible customer-generator and shall be priced in accordance with the generation component, established under the applicable structure to which the customer would be assigned if the customer did not use a renewable electrical generation facility.
(3)All costs and credits shall be shown on the eligible customer-generators bill for each billing period. In any months in which the eligible customer-generator has been a net consumer of electricity calculated on the basis of value determined pursuant to paragraph (2), the customer-generator shall owe to the local publicly owned electric utility the balance of electricity costs and credits during that billing period. In any billing period in which the eligible customer-generator has been a net producer of electricity calculated on the basis of value determined pursuant to paragraph (2), the local publicly owned electric utility shall owe to the eligible customer-generator the balance of electricity costs and credits during that billing period. Any net credit to the eligible customer-generator of electricity costs may be carried forward to subsequent billing periods, provided that a local publicly owned electric utility may choose to carry the credit over as a kilowatthour credit consistent with the provisions of any applicable contract or tariff, including any differences attributable to the time of generation of the electricity. At the end of each 12-month period, the local publicly owned electric utility may reduce any net credit due to the eligible customer-generator to zero.
(j)A renewable electrical generation facility used by an eligible customer-generator shall meet all applicable safety and performance standards established by the National Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories, including Underwriters Laboratories Incorporated and, where applicable, rules of the commission regarding safety and reliability. A customer-generator whose renewable electrical generation facility meets those standards and rules shall not be required to install additional controls, perform or pay for additional tests, or purchase additional liability insurance.
(k)If the commission determines that there are cost or revenue obligations for an electrical corporation that may not be recovered from customer-generators acting pursuant to this section, those obligations shall remain within the customer class from which any shortfall occurred and shall not be shifted to any other customer class. Net energy metering and coenergy metering customers shall not be exempt from the public goods charges imposed pursuant to Article 7 (commencing with Section 381), Article 8 (commencing with Section 385), or Article 15 (commencing with Section 399) of Chapter 2.3 of Part 1.
(l)A net energy metering, coenergy metering, or wind energy cometering customer shall reimburse the Department of Water Resources for all charges that would otherwise be imposed on the customer by the commission to recover bond-related costs pursuant to an agreement between the commission and the Department of Water Resources pursuant to Section 80110 of the Water Code, and the costs of the department equal to the share of the departments estimated net unavoidable power purchase contract costs attributable to the customer. The commission shall incorporate the determination into an existing proceeding before the commission, and shall ensure that the charges are nonbypassable. Until the commission has made a determination regarding the nonbypassable charges, net energy metering, coenergy metering, and wind energy cometering shall continue under the same rules, procedures, terms, and conditions as were applicable on December 31, 2002.
(m)In implementing the requirements of subdivisions (k) and (l), an eligible customer-generator shall not be required to replace its existing meter except as set forth in paragraph (1) of subdivision (c), and the electric utility shall not require additional measurement of usage beyond that which is necessary for customers in the same rate class as the eligible customer-generator.
(n)It is the intent of the Legislature that the Treasurer incorporate net energy metering, including net surplus electricity compensation, coenergy metering, and wind energy cometering projects undertaken pursuant to this section as sustainable building methods or distributive energy technologies for purposes of evaluating low-income housing projects.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares that a program to provide net energy metering combined with net surplus compensation, co-energy coenergy metering, and wind energy co-metering cometering for eligible customer-generators is one way to encourage substantial private investment in renewable energy resources, stimulate in-state economic growth, reduce demand for electricity during peak consumption periods, help stabilize Californias energy supply infrastructure, enhance the continued diversification of Californias energy resource mix, reduce interconnection and administrative costs for electricity suppliers, and encourage conservation and efficiency.
(b)As used in this section, the following terms have the following meanings:
(1)Co-energy Coenergy metering means a program that is the same in all other respects as a net energy metering program, except that the local publicly owned electric utility has elected to apply a generation-to-generation energy and time-of-use credit formula as provided in subdivision (i).
(2)Electrical cooperative means an electrical cooperative as defined in Section 2776.
(3)Electric utility means an electrical corporation, a local publicly owned electric utility, or an electrical cooperative, or any other entity, except an electric service provider, that offers electrical service. This section shall not apply to a local publicly owned electric utility that serves more than 750,000 customers and that also conveys water to its customers.
(4)(A)Eligible customer-generator means a residential customer, small commercial customer as defined in subdivision (h) of Section 331, or commercial, industrial, or agricultural customer of an electric utility, who uses a renewable electrical generation facility, or a combination of those facilities, with a total capacity of not more than one megawatt, that is located on the customers owned, leased, or rented premises, and is interconnected and operates in parallel with the electrical grid, and is intended primarily to offset part or all of the customers own electrical requirements.
(B)(i)Notwithstanding subparagraph (A), eligible customer-generator includes the Department of Corrections and Rehabilitation using a renewable electrical generation technology, or a combination of renewable electrical generation technologies, with a total capacity of not more than eight megawatts, that is located on the departments owned, leased, or rented premises, and is interconnected and operates in parallel with the electrical grid, and is intended primarily to offset part or all of the facilitys own electrical requirements. The amount of any wind generation exported to the electrical grid shall not exceed 1.35 megawatt at any time.
(ii)Notwithstanding paragraph (2) of subdivision (e), an electrical corporation shall be afforded a prudent but necessary time, as determined by the executive director of the commission, to study the impacts of a request for interconnection of a renewable generator with a capacity of greater than one megawatt under this subparagraph. If the study reveals the need for upgrades to the transmission or distribution system arising solely from the interconnection, the electrical corporation shall be afforded the time necessary to complete those upgrades before the interconnection and those costs shall be borne by the customer-generator. Upgrade projects shall comply with applicable state and federal requirements, including requirements of the Federal Energy Regulatory Commission.
(C)(i)For purposes of this subparagraph, a United States Armed Forces base or facility is an establishment under the jurisdiction of the United States Army, Navy, Air Force, Marine Corps, Space Force, or Coast Guard.
(ii)Notwithstanding subparagraph (A), a United States Armed Forces base or facility is an eligible customer-generator if the base or facility uses a renewable electrical generation facility, or a combination of those facilities, the renewable electrical generation facility is located on premises owned, leased, or rented by the United States Armed Forces base or facility, the renewable electrical generation facility is interconnected and operates in parallel with the electrical grid, the renewable electrical generation facility is intended primarily to offset part or all of the base or facilitys own electrical requirements, and the renewable electrical generation facility has a generating capacity that does not exceed the lesser of 12 megawatts or one megawatt greater than the minimum load of the base or facility over the prior 36 months. Unless prohibited by federal law, a renewable electrical generation facility shall not be eligible for net energy metering for privatized military housing pursuant to this subparagraph if the renewable electrical generation facility was procured using a sole source process. A renewable electrical generation facility procured using best value criteria, if otherwise eligible, may be used for net energy metering for privatized military housing pursuant to this subparagraph. For these purposes, best value criteria means a value determined by objective criteria and may include, but is not limited to, price, features, functions, and life-cycle costs.
(iii)A United States Armed Forces base or facility that is an eligible customer generator pursuant to this subparagraph shall not receive compensation for exported generation.
(iv)Notwithstanding paragraph (2) of subdivision (e), an electrical corporation shall be afforded a prudent but necessary time, as determined by the executive director of the commission but not less than 60 working days, to study the impacts of a request for interconnection of a renewable electrical generation facility with a capacity of greater than one megawatt pursuant to this subparagraph. If the study reveals the need for upgrades to the transmission or distribution system arising solely from the interconnection, the electrical corporation shall be afforded the time necessary to complete those upgrades before the interconnection and the costs of those upgrades shall be borne by the eligible customer-generator. Upgrade projects shall comply with applicable state and federal requirements, including requirements of the Federal Energy Regulatory Commission. For any a renewable generation facility that interconnects directly to the transmission grid or that requires transmission upgrades, the United States Armed Forces base or facility shall comply with all Federal Energy Regulatory Commission interconnection procedures and requirements.
(v)An electrical corporation shall make a tariff, as approved by the commission, available pursuant to this subparagraph by November 1, 2015.
(vi)This subparagraph shall not apply to a tariff made available pursuant to Section 2827.1.
(5)Large electrical corporation means an electrical corporation with more than 100,000 service connections in California.
(6)Net energy metering means measuring the difference between the electricity supplied through the electrical grid and the electricity generated by an eligible customer-generator and fed back to the electrical grid over a 12-month period as described in subdivisions (c) and (h).
(7)Net surplus customer-generator means an eligible customer-generator that generates more electricity during a 12-month period than is supplied by the electric utility to the eligible customer-generator during the same 12-month period.
(8)Net surplus electricity means all electricity generated by an eligible customer-generator measured in kilowatthours over a 12-month period that exceeds the amount of electricity consumed by that eligible customer-generator.
(9)Net surplus electricity compensation means a per kilowatthour rate offered by the electric utility to the net surplus customer-generator for net surplus electricity that is set by the ratemaking authority pursuant to subdivision (h).
(10)Ratemaking authority means, for an electrical corporation, the commission, for an electrical cooperative, its ratesetting body selected by its shareholders or members, and for a local publicly owned electric utility, the local elected body responsible for setting the rates of the local publicly owned utility.
(11)Renewable electrical generation facility means a facility that generates electricity from a renewable source listed in paragraph (1) of subdivision (a) of Section 25741 of the Public Resources Code. A small hydroelectric generation facility is not an eligible renewable electrical generation facility if it will cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(12)Wind energy co-metering cometering means any wind energy project greater than 50 kilowatts, but not exceeding one megawatt, where the difference between the electricity supplied through the electrical grid and the electricity generated by an eligible customer-generator and fed back to the electrical grid over a 12-month period is as described in subdivision (h). Wind energy co-metering cometering shall be accomplished pursuant to Section 2827.8.
(c)(1)Except as provided in paragraph (4) and in Section 2827.1, every electric utility shall develop a standard contract or tariff providing for net energy metering, and shall make this standard contract or tariff available to eligible customer-generators, upon request, on a first-come-first-served basis until the time that the total rated generating capacity used by eligible customer-generators exceeds 5 percent of the electric utilitys aggregate customer peak demand. Net energy metering shall be accomplished using a single meter capable of registering the flow of electricity in two directions. An additional meter or meters to monitor the flow of electricity in each direction may be installed with the consent of the eligible customer-generator, at the expense of the electric utility, and the additional metering shall be used only to provide the information necessary to accurately bill or credit the eligible customer-generator pursuant to subdivision (h), or to collect generating system performance information for research purposes relative to a renewable electrical generation facility. If the existing electrical meter of an eligible customer-generator is not capable of measuring the flow of electricity in two directions, the eligible customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is able to measure electricity flow in two directions. If an additional meter or meters are installed, the net energy metering calculation shall yield a result identical to that of a single meter. An eligible customer-generator that is receiving service other than through the standard contract or tariff may elect to receive service through the standard contract or tariff until the electric utility reaches the generation limit set forth in this paragraph. Once the generation limit is reached, only eligible customer-generators that had previously elected to receive service pursuant to the standard contract or tariff have a right to continue to receive service pursuant to the standard contract or tariff. Eligibility for net energy metering does not limit an eligible customer-generators eligibility for any other rebate, incentive, or credit provided by the electric utility, or pursuant to any governmental program, including rebates and incentives provided pursuant to the California Solar Initiative.
(2)An electrical corporation shall include a provision in the net energy metering contract or tariff requiring that any customer with an existing electrical generating facility and meter who enters into a new net energy metering contract shall provide an inspection report to the electrical corporation, unless the electrical generating facility and meter have been installed or inspected within the previous three years. The inspection report shall be prepared by a California licensed contractor who is not the owner or operator of the facility and meter. A California licensed electrician shall perform the inspection of the electrical portion of the facility and meter.
(3)(A)On an annual basis, every electric utility shall make available to the ratemaking authority information on the total rated generating capacity used by eligible customer-generators that are customers of that provider in the providers service area and the net surplus electricity purchased by the electric utility pursuant to this section.
(B)An electric service provider operating pursuant to Section 394 shall make available to the ratemaking authority the information required by this paragraph for each eligible customer-generator that is their customer for each service area of an electrical corporation, local publicly owned electrical utility, or electrical cooperative, in which the eligible customer-generator has net energy metering.
(C)The ratemaking authority shall develop a process for making the information required by this paragraph available to electric utilities, and for using that information to determine when, pursuant to paragraphs (1) and (4), an electric utility is not obligated to provide net energy metering to additional eligible customer-generators in its service area.
(4)(A)An electric utility that is not a large electrical corporation is not obligated to provide net energy metering to additional eligible customer-generators in its service area when the combined total peak demand of all electricity used by eligible customer-generators served by all the electric utilities in that service area furnishing net energy metering to eligible customer-generators exceeds 5 percent of the aggregate customer peak demand of those electric utilities.
(B)The commission shall require every large electrical corporation to make the standard contract or tariff available to eligible customer-generators, continuously and without interruption, until such times as the large electrical corporation reaches its net energy metering program limit or July 1, 2017, whichever is earlier. A large electrical corporation reaches its program limit when the combined total peak demand of all electricity used by eligible customer-generators served by all the electric utilities in the large electrical corporations service area furnishing net energy metering to eligible customer-generators exceeds 5 percent of the aggregate customer peak demand of those electric utilities. For purposes of calculating a large electrical corporations program limit, aggregate customer peak demand means the highest sum of the noncoincident peak demands of all of the large electrical corporations customers that occurs in any calendar year. To determine the aggregate customer peak demand, every large electrical corporation shall use a uniform method approved by the commission. The program limit calculated pursuant to this paragraph shall not be less than the following:
(i)For San Diego Gas and Electric Company, when it has made 607 megawatts of nameplate generating capacity available to eligible customer-generators.
(ii)For Southern California Edison Company, when it has made 2,240 megawatts of nameplate generating capacity available to eligible customer-generators.
(iii)For Pacific Gas and Electric Company, when it has made 2,409 megawatts of nameplate generating capacity available to eligible customer-generators.
(C)Every large electrical corporation shall file a monthly report with the commission detailing the progress toward the net energy metering program limit established in subparagraph (B). The report shall include separate calculations on progress toward the limits based on operating solar energy systems, cumulative numbers of interconnection requests for net energy metering eligible systems, and any other criteria required by the commission.
(D)Beginning July 1, 2017, or upon reaching the net metering program limit of subparagraph (B), whichever is earlier, the obligation of a large electrical corporation to provide service pursuant to a standard contract or tariff shall be pursuant to Section 2827.1 and applicable state and federal requirements.
(d)Every electric utility shall make all necessary forms and contracts for net energy metering and net surplus electricity compensation service available for download from the Internet. internet.
(e)(1)Every electric utility shall ensure that requests for establishment of net energy metering and net surplus electricity compensation are processed in a time period not exceeding that for similarly situated customers requesting new electric service, but not to exceed 30 working days from the date it receives a completed application form for net energy metering service or net surplus electricity compensation, including a signed interconnection agreement from an eligible customer-generator and the electric inspection clearance from the governmental authority having jurisdiction.
(2)Every electric utility shall ensure that requests for an interconnection agreement from an eligible customer-generator are processed in a time period not to exceed 30 working days from the date it receives a completed application form from the eligible customer-generator for an interconnection agreement.
(3)If an electric utility is unable to process a request within the allowable timeframe pursuant to paragraph (1) or (2), it shall notify the eligible customer-generator and the ratemaking authority of the reason for its inability to process the request and the expected completion date.
(f)(1)If a customer participates in direct transactions pursuant to paragraph (1) of subdivision (b) of Section 365, or Section 365.1, with an electric service provider that does not provide distribution service for the direct transactions, the electric utility that provides distribution service for the eligible customer-generator is not obligated to provide net energy metering or net surplus electricity compensation to the customer.
(2)If a customer participates in direct transactions pursuant to paragraph (1) of subdivision (b) of Section 365 or 365.1 with an electric service provider, and the customer is an eligible customer-generator, the electric utility that provides distribution service for the direct transactions may recover from the customers electric service provider the incremental costs of metering and billing service related to net energy metering and net surplus electricity compensation in an amount set by the ratemaking authority.
(g)Except for the time-variant kilowatthour pricing portion of any tariff adopted by the commission pursuant to paragraph (4) of subdivision (a) of Section 2851, each net energy metering contract or tariff shall be identical, with respect to rate structure, all retail rate components, and any monthly charges, to the contract or tariff to which the same customer would be assigned if the customer did not use a renewable electrical generation facility, except that eligible customer-generators shall not be assessed standby charges on the electrical generating capacity or the kilowatthour production of a renewable electrical generation facility. The charges for all retail rate components for eligible customer-generators shall be based exclusively on the customer-generators net kilowatthour consumption over a 12-month period, without regard to the eligible customer-generators choice as to from whom it purchases electricity that is not self-generated. Any new or additional demand charge, standby charge, customer charge, minimum monthly charge, interconnection charge, or any other charge that would increase an eligible customer-generators costs beyond those of other customers who are not eligible customer-generators in the rate class to which the eligible customer-generator would otherwise be assigned if the customer did not own, lease, rent, or otherwise operate a renewable electrical generation facility is contrary to the intent of this section, and shall not form a part of net energy metering contracts or tariffs.
(h)For eligible customer-generators, the net energy metering calculation shall be made by measuring the difference between the electricity supplied to the eligible customer-generator and the electricity generated by the eligible customer-generator and fed back to the electrical grid over a 12-month period. The following rules shall apply to the annualized net metering calculation:
(1)The eligible residential or small commercial customer-generator, at the end of each 12-month period following the date of final interconnection of the eligible customer-generators system with an electric utility, and at each anniversary date thereafter, shall be billed for electricity used during that 12-month period. The electric utility shall determine if the eligible residential or small commercial customer-generator was a net consumer or a net surplus customer-generator during that period.
(2)At the end of each 12-month period, where the electricity supplied during the period by the electric utility exceeds the electricity generated by the eligible residential or small commercial customer-generator during that same period, the eligible residential or small commercial customer-generator is a net electricity consumer and the electric utility shall be owed compensation for the eligible customer-generators net kilowatthour consumption over that 12-month period. The compensation owed for the eligible residential or small commercial customer-generators consumption shall be calculated as follows:
(A)For all eligible customer-generators taking service under contracts or tariffs employing baseline and over baseline rates, any net monthly consumption of electricity shall be calculated according to the terms of the contract or tariff to which the same customer would be assigned to, or be eligible for, if the customer was not an eligible customer-generator. If those same customer-generators are net generators over a billing period, the net kilowatthours generated shall be valued at the same price per kilowatthour as the electric utility would charge for the baseline quantity of electricity during that billing period, and and, if the number of kilowatthours generated exceeds the baseline quantity, the excess shall be valued at the same price per kilowatthour as the electric utility would charge for electricity over the baseline quantity during that billing period.
(B)For all eligible customer-generators taking service under contracts or tariffs employing time-of-use rates, any net monthly consumption of electricity shall be calculated according to the terms of the contract or tariff to which the same customer would be assigned, or be eligible for, if the customer was not an eligible customer-generator. When those same customer-generators are net generators during any discrete time-of-use period, the net kilowatthours produced shall be valued at the same price per kilowatthour as the electric utility would charge for retail kilowatthour sales during that same time-of-use period. If the eligible customer-generators time-of-use electrical meter is unable to measure the flow of electricity in two directions, paragraph (1) of subdivision (c) shall apply.
(C)For all eligible residential and small commercial customer-generators and for each billing period, the net balance of moneys owed to the electric utility for net consumption of electricity or credits owed to the eligible customer-generator for net generation of electricity shall be carried forward as a monetary value until the end of each 12-month period. For all eligible commercial, industrial, and agricultural customer-generators, the net balance of moneys owed shall be paid in accordance with the electric utilitys normal billing cycle, except that if the eligible commercial, industrial, or agricultural customer-generator is a net electricity producer over a normal billing cycle, any excess kilowatthours generated during the billing cycle shall be carried over to the following billing period as a monetary value, calculated according to the procedures set forth in this section, and appear as a credit on the eligible commercial, industrial, or agricultural customer-generators account, until the end of the annual period when paragraph (3) shall apply.
(3)At the end of each 12-month period, where the electricity generated by the eligible customer-generator during the 12-month period exceeds the electricity supplied by the electric utility during that same period, the eligible customer-generator is a net surplus customer-generator and the electric utility, upon an affirmative election by the net surplus customer-generator, shall either (A) provide net surplus electricity compensation for any net surplus electricity generated during the prior 12-month period, or (B) allow the net surplus customer-generator to apply the net surplus electricity as a credit for kilowatthours subsequently supplied by the electric utility to the net surplus customer-generator. For an eligible customer-generator that does not affirmatively elect to receive service pursuant to net surplus electricity compensation, the electric utility shall retain any excess kilowatthours generated during the prior 12-month period. The eligible customer-generator not affirmatively electing to receive service pursuant to net surplus electricity compensation shall not be owed any compensation for the net surplus electricity unless the electric utility enters into a purchase agreement with the eligible customer-generator for those excess kilowatthours. Every electric utility shall provide notice to eligible customer-generators that they are eligible to receive net surplus electricity compensation for net surplus electricity, that they must elect to receive net surplus electricity compensation, and that the 12-month period commences when the electric utility receives the eligible customer-generators election. For an electric utility that is an electrical corporation or electrical cooperative, the commission may adopt requirements for providing notice and the manner by which eligible customer-generators may elect to receive net surplus electricity compensation.
(4)(A)An eligible customer-generator with multiple meters may elect to aggregate the electrical load of the meters located on the property where the renewable electrical generation facility is located and on all property adjacent or contiguous to the property on which the renewable electrical generation facility is located, if those properties are solely owned, leased, or rented by the eligible customer-generator. If the eligible customer-generator elects to aggregate the electric load pursuant to this paragraph, the electric utility shall use the aggregated load for the purpose of determining whether an eligible customer-generator is a net consumer or a net surplus customer-generator during a 12-month period.
(B)If an eligible customer-generator chooses to aggregate pursuant to subparagraph (A), the eligible customer-generator shall be permanently ineligible to receive net surplus electricity compensation, and the electric utility shall retain any kilowatthours in excess of the eligible customer-generators aggregated electrical load generated during the 12-month period.
(C)If an eligible customer-generator with multiple meters elects to aggregate the electrical load of those meters pursuant to subparagraph (A), and different rate schedules are applicable to service at any of those meters, the electricity generated by the renewable electrical generation facility shall be allocated to each of the meters in proportion to the electrical load served by those meters. For example, if the eligible customer-generator receives electric service through three meters, two meters being at an agricultural rate that each provide service to 25 percent of the customers total load, and a third meter, at a commercial rate, that provides service to 50 percent of the customers total load, then 50 percent of the electrical generation of the eligible renewable generation facility shall be allocated to the third meter that provides service at the commercial rate and 25 percent of the generation shall be allocated to each of the two meters providing service at the agricultural rate. This proportionate allocation shall be computed each billing period.
(D)This paragraph shall not become operative for an electrical corporation unless the commission determines that allowing eligible customer-generators to aggregate their load from multiple meters will not result in an increase in the expected revenue obligations of customers who are not eligible customer-generators. The commission shall make this determination by September 30, 2013. In making this determination, the commission shall determine if there are any public purpose or other noncommodity charges that the eligible customer-generators would pay pursuant to the net energy metering program as it exists prior to aggregation, that the eligible customer-generator would not pay if permitted to aggregate the electrical load of multiple meters pursuant to this paragraph.
(E)A local publicly owned electric utility or electrical cooperative shall only allow eligible customer-generators to aggregate their load if the utilitys ratemaking authority determines that allowing eligible customer-generators to aggregate their load from multiple meters will not result in an increase in the expected revenue obligations of customers that are not eligible customer-generators. The ratemaking authority of a local publicly owned electric utility or electrical cooperative shall make this determination within 180 days of the first request made by an eligible customer-generator to aggregate their load. In making the determination, the ratemaking authority shall determine if there are any public purpose or other noncommodity charges that the eligible customer-generator would pay pursuant to the net energy metering or co-energy coenergy metering program of the utility as it exists prior to before aggregation, that the eligible customer-generator would not pay if permitted to aggregate the electrical load of multiple meters pursuant to this paragraph. If the ratemaking authority determines that load aggregation will not cause an incremental rate impact on the utilitys customers that are not eligible customer-generators, the local publicly owned electric utility or electrical cooperative shall permit an eligible customer-generator to elect to aggregate the electrical load of multiple meters pursuant to this paragraph. The ratemaking authority may reconsider any determination made pursuant to this subparagraph in a subsequent public proceeding.
(F)For purposes of this paragraph, parcels that are divided by a street, highway, or public thoroughfare are considered contiguous, provided they are otherwise contiguous and under the same ownership.
(G)An eligible customer-generator may only elect to aggregate the electrical load of multiple meters if the renewable electrical generation facility, or a combination of those facilities, has a total generating capacity of not more than one megawatt.
(H)Notwithstanding subdivision (g), an eligible customer-generator electing to aggregate the electrical load of multiple meters pursuant to this subdivision shall remit service charges for the cost of providing billing services to the electric utility that provides service to the meters.
(I)The commission shall ensure that logistics businesses and manufacturing businesses are eligible customer-generators for purposes of this paragraph, if the commission elects to extend the program pursuant to this paragraph.
(5)(A)The ratemaking authority shall establish a net surplus electricity compensation valuation to compensate the net surplus customer-generator for the value of net surplus electricity generated by the net surplus customer-generator. The commission shall establish the valuation in a ratemaking proceeding. The ratemaking authority for a local publicly owned electric utility shall establish the valuation in a public proceeding. The net surplus electricity compensation valuation shall be established so as to provide the net surplus customer-generator just and reasonable compensation for the value of net surplus electricity, while leaving other ratepayers unaffected. The ratemaking authority shall determine whether the compensation will include, where appropriate justification exists, either or both of the following components:
(i)The value of the electricity itself.
(ii)The value of the renewable attributes of the electricity.
(B)In establishing the rate pursuant to subparagraph (A), the ratemaking authority shall ensure that the rate does not result in a shifting of costs between eligible customer-generators and other bundled service customers.
(6)(A)Upon adoption of the net surplus electricity compensation rate by the ratemaking authority, any renewable energy credit, as defined in Section 399.12, for net surplus electricity purchased by the electric utility shall belong to the electric utility. Any renewable energy credit associated with electricity generated by the eligible customer-generator that is utilized used by the eligible customer-generator shall remain the property of the eligible customer-generator.
(B)Upon adoption of the net surplus electricity compensation rate by the ratemaking authority, the net surplus electricity purchased by the electric utility shall count toward the electric utilitys renewables portfolio standard annual procurement targets for the purposes of paragraph (1) of subdivision (b) of Section 399.15, or for a local publicly owned electric utility, the renewables portfolio standard annual procurement targets established pursuant to Section 399.30.
(7)The electric utility shall provide every eligible residential or small commercial customer-generator with net electricity consumption and net surplus electricity generation information with each regular bill. That information shall include the current monetary balance owed the electric utility for net electricity consumed, or the net surplus electricity generated, since the last 12-month period ended. Notwithstanding this subdivision, an electric utility shall permit that customer to pay monthly for net energy consumed.
(8)If an eligible residential or small commercial customer-generator terminates the customer relationship with the electric utility, the electric utility shall reconcile the eligible customer-generators consumption and production of electricity during any part of a 12-month period following the last reconciliation, according to the requirements set forth in this subdivision, except that those requirements shall apply only to the months since the most recent 12-month bill.
(9)If an electric service provider or electric utility providing net energy metering to a residential or small commercial customer-generator ceases providing that electric service to that customer during any 12-month period, and the customer-generator enters into a new net energy metering contract or tariff with a new electric service provider or electric utility, the 12-month period, with respect to that new electric service provider or electric utility, shall commence on the date on which the new electric service provider or electric utility first supplies electric service to the customer-generator.
(i)Notwithstanding any other provisions provision of this section, paragraphs (1), (2), and (3) shall apply to an eligible customer-generator with a capacity of more than 10 kilowatts, but not exceeding one megawatt, that receives electric service from a local publicly owned electric utility that has elected to utilize use a co-energy coenergy metering program unless the local publicly owned electric utility chooses to provide service for eligible customer-generators with a capacity of more than 10 kilowatts in accordance with subdivisions (g) and (h):
(1)The eligible customer-generator shall be required to utilize use a meter, or multiple meters, capable of separately measuring electricity flow in both directions. All meters shall provide time-of-use measurements of electricity flow, and the customer shall take service on a time-of-use rate schedule. If the existing meter of the eligible customer-generator is not a time-of-use meter or is not capable of measuring total flow of electricity in both directions, the eligible customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is both time-of-use and able to measure total electricity flow in both directions. This subdivision shall not restrict the ability of an eligible customer-generator to utilize use any economic incentives provided by a governmental agency or an electric utility to reduce its costs for purchasing and installing a time-of-use meter.
(2)The consumption of electricity from the local publicly owned electric utility shall result in a cost to the eligible customer-generator to be priced in accordance with the standard rate charged to the eligible customer-generator in accordance with the rate structure to which the customer would be assigned if the customer did not use a renewable electrical generation facility. The generation of electricity provided to the local publicly owned electric utility shall result in a credit to the eligible customer-generator and shall be priced in accordance with the generation component, established under the applicable structure to which the customer would be assigned if the customer did not use a renewable electrical generation facility.
(3)All costs and credits shall be shown on the eligible customer-generators bill for each billing period. In any months in which the eligible customer-generator has been a net consumer of electricity calculated on the basis of value determined pursuant to paragraph (2), the customer-generator shall owe to the local publicly owned electric utility the balance of electricity costs and credits during that billing period. In any billing period in which the eligible customer-generator has been a net producer of electricity calculated on the basis of value determined pursuant to paragraph (2), the local publicly owned electric utility shall owe to the eligible customer-generator the balance of electricity costs and credits during that billing period. Any net credit to the eligible customer-generator of electricity costs may be carried forward to subsequent billing periods, provided that a local publicly owned electric utility may choose to carry the credit over as a kilowatthour credit consistent with the provisions of any applicable contract or tariff, including any differences attributable to the time of generation of the electricity. At the end of each 12-month period, the local publicly owned electric utility may reduce any net credit due to the eligible customer-generator to zero.
(j)A renewable electrical generation facility used by an eligible customer-generator shall meet all applicable safety and performance standards established by the National Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories, including Underwriters Laboratories Incorporated and, where applicable, rules of the commission regarding safety and reliability. A customer-generator whose renewable electrical generation facility meets those standards and rules shall not be required to install additional controls, perform or pay for additional tests, or purchase additional liability insurance.
(k)If the commission determines that there are cost or revenue obligations for an electrical corporation that may not be recovered from customer-generators acting pursuant to this section, those obligations shall remain within the customer class from which any shortfall occurred and shall not be shifted to any other customer class. Net energy metering and co-energy coenergy metering customers shall not be exempt from the public goods charges imposed pursuant to Article 7 (commencing with Section 381), Article 8 (commencing with Section 385), or Article 15 (commencing with Section 399) of Chapter 2.3 of Part 1.
(l)A net energy metering, co-energy coenergy metering, or wind energy co-metering cometering customer shall reimburse the Department of Water Resources for all charges that would otherwise be imposed on the customer by the commission to recover bond-related costs pursuant to an agreement between the commission and the Department of Water Resources pursuant to Section 80110 of the Water Code, as well as and the costs of the department equal to the share of the departments estimated net unavoidable power purchase contract costs attributable to the customer. The commission shall incorporate the determination into an existing proceeding before the commission, and shall ensure that the charges are nonbypassable. Until the commission has made a determination regarding the nonbypassable charges, net energy metering, co-energy coenergy metering, and wind energy co-metering cometering shall continue under the same rules, procedures, terms, and conditions as were applicable on December 31, 2002.
(m)In implementing the requirements of subdivisions (k) and (l), an eligible customer-generator shall not be required to replace its existing meter except as set forth in paragraph (1) of subdivision (c), nor shall and the electric utility shall not require additional measurement of usage beyond that which is necessary for customers in the same rate class as the eligible customer-generator.
(n)It is the intent of the Legislature that the Treasurer incorporate net energy metering, including net surplus electricity compensation, co-energy coenergy metering, and wind energy co-metering cometering projects undertaken pursuant to this section as sustainable building methods or distributive energy technologies for purposes of evaluating low-income housing projects.
SEC. 9.SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)Public utility includes every common carrier, toll bridge corporation, pipeline corporation, gas corporation, electrical corporation, telephone corporation, telegraph corporation, water corporation, sewer system corporation, and heat corporation, where the service is performed for, or the commodity is delivered to, the public or any portion thereof.
(2)A provider of last resort, as defined in Section 387, that is providing service pursuant to Article 8.5 (commencing with Section 387) of Chapter 2.3 is a public utility subject to the jurisdiction, control, and regulation of the commission and the provisions of this part regarding providing that service.
(b)Whenever any common carrier, toll bridge corporation, pipeline corporation, gas corporation, electrical corporation, telephone corporation, telegraph corporation, water corporation, sewer system corporation, or heat corporation performs a service for, or delivers a commodity to, the public or any portion thereof for which any compensation or payment whatsoever is received, that common carrier, toll bridge corporation, pipeline corporation, gas corporation, electrical corporation, telephone corporation, telegraph corporation, water corporation, sewer system corporation, or heat corporation, corporation is a public utility subject to the jurisdiction, control, and regulation of the commission and the provisions of this part.
(c)When any person or corporation performs any service for, or delivers any commodity to, any person, private corporation, municipality, or other political subdivision of the state, that in turn either directly or indirectly, mediately or immediately, performs that service for, or delivers that commodity to, the public or any portion thereof, that person or corporation is a public utility subject to the jurisdiction, control, and regulation of the commission and the provisions of this part.
(d)Ownership or operation of a facility that employs cogeneration technology or produces power from other than a conventional power source or the ownership or operation of a facility which that employs landfill gas technology does not make a corporation or person a public utility within the meaning of this section solely because of the ownership or operation of that facility.
(e)Any corporation or person engaged directly or indirectly in developing, producing, transmitting, distributing, delivering, or selling any form of heat derived from geothermal or solar resources or from cogeneration technology to any privately owned or publicly owned public utility, or to the public or any portion thereof, is not a public utility within the meaning of this section solely by reason of engaging in any of those activities.
(f)The ownership or operation of a facility that sells compressed natural gas or hydrogen at retail to the public for use only as a motor vehicle fuel, and the selling of compressed natural gas or hydrogen at retail from that facility to the public for use only as a motor vehicle fuel, does not make the corporation or person a public utility within the meaning of this section solely because of that ownership, operation, or sale.
(g)Ownership or operation of a facility that is an exempt wholesale generator, as defined in the Public Utility Holding Company Act of 2005 (42 U.S.C. Sec. 16451(6)), does not make a corporation or person a public utility within the meaning of this section, solely due to the ownership or operation of that facility.
(h)The ownership, control, operation, or management of an electric plant used for direct transactions or participation directly or indirectly in direct transactions, as permitted by subdivision (b) of Section 365, sales into a market established and operated by the Independent System Operator or any other wholesale electricity market, or the use or sale as permitted under subdivisions subdivision (b) to (d), inclusive, of Section 218, shall not make a corporation or person a public utility within the meaning of this section solely because of that ownership, participation, or sale.
(i)The ownership, control, operation, or management of a facility that supplies electricity to the public only for use to charge light duty plug-in electric vehicles does not make the corporation or person a public utility within the meaning of this section solely because of that ownership, control, operation, or management. For purposes of this subdivision, light duty plug-in electric vehicles includes light duty battery electric and plug-in hybrid electric vehicles. This subdivision does not affect the commissions authority under Section 454 or 740.2 or any other applicable statute.
SEC. 2.Section 218 of the Public Utilities Code is amended to read:218.(a)Electrical corporation includes every corporation or person owning, controlling, operating, or managing any electric plant for compensation within this state, except where electricity is generated on or distributed by the producer through private property solely primarily for its own use or the use of its tenants and not for sale or transmission to others.
(b)Electrical corporation does not include a corporation or person employing cogeneration technology or producing power from other than a conventional power source for the generation of generating electricity solely primarily for any one or more of the following purposes:
(1)Its own use or the use of its tenants.(2)The use of or sale to not more than two other corporations or persons solely for use on the real property on which the electricity is generated or on real property immediately adjacent thereto, unless there is an intervening public street constituting the boundary between the real property on which the electricity is generated and the immediately adjacent property and one or more of the following applies:(A)The real property on which the electricity is generated and the immediately adjacent real property is not under common ownership or control, or that common ownership or control was gained solely for purposes of sale of the electricity so generated and not for other business purposes.(B)The useful thermal output of the facility generating the electricity is not used on the immediately adjacent property for petroleum production or refining.(C)The electricity furnished to the immediately adjacent property is not utilized by a subsidiary or affiliate of the corporation or person generating the electricity.(3)Sale or transmission to an electrical corporation or state or local public agency, but not for sale or transmission to others, unless the corporation or person is otherwise an electrical corporation.(c)Electrical corporation does not include a corporation or person employing landfill gas technology for the generation of electricity for any one or more of the following purposes:(1)Its own use or the use of not more than two of its tenants located on the real property on which the electricity is generated.(2)The use of or sale to not more than two other corporations or persons solely for use on the real property on which the electricity is generated.(3)Sale or transmission to an electrical corporation or state or local public agency.(d)Electrical corporation does not include a corporation or person employing digester gas technology for the generation of electricity for any one or more of the following purposes:(1)Its own use or the use of not more than two of its tenants located on the real property on which the electricity is generated.(2)The use of or sale to not more than two other corporations or persons solely for use on the real property on which the electricity is generated.(3)Sale or transmission to an electrical corporation or state or local public agency, if the sale or transmission of the electricity service to a retail customer is provided through the transmission system of the existing local publicly owned electric utility or electrical corporation of that retail customer.(1)Employing one or more distributed energy resources, as defined in Section 8370, that may be coupled with one or more energy storage systems, for the generation of electricity primarily for its own use, the use of its tenants, the use of the members of a cooperative, condominium, homeowners association, or special district, or the use of electricity users on adjacent or contiguous properties.
(2)Employing cogeneration technology, landfill gas technology, or digester gas technology, for the generation of electricity for sale or transmission to an electrical corporation or state or local public agency, if the sale or transmission of the electricity service to a retail customer is provided through the transmission system of the existing local publicly owned electric utility or electrical corporation of that retail customer.
(3)Operating a microgrid, as defined in Section 8370, that primarily serves the included load of the microgrid, if the corporation or person operating a microgrid meets the requirements of subdivision (a) of Section 8373.
(e)(c)Electrical corporation does not include an independent solar energy producer, as defined in Article 3 (commencing with Section 2868) of Chapter 9 of Part 2.
(f)The amendments made to this section at the 1987 portion of the 198788 Regular Session of the Legislature do not apply to any corporation or person employing cogeneration technology or producing power from other than a conventional power source for the generation of electricity that physically produced electricity prior to January 1, 1989, and furnished that electricity to immediately adjacent real property for use thereon prior to January 1, 1989.SEC. 3.Section 218.3 of the Public Utilities Code is amended to read:218.3.(a)Electric service provider means an entity that offers electrical service to customers within the service territory of an electrical corporation and includes the unregulated affiliates and subsidiaries of an electrical corporation.
(b)Electric service provider does not include an entity that offers electrical service solely primarily to service customer load consistent with subdivision (b) of Section 218, and does not include an electrical corporation or a public agency that offers electrical service to residential and small commercial customers within its jurisdiction, or within the service territory of a local publicly owned electric utility.
(c)Electric service provider does not include an independent solar energy producer, as defined in Article 3 (commencing with Section 2868) of Chapter 9 of Part 2.
SEC. 4.Section 394 of the Public Utilities Code is amended to read:394.(a)As used in this section, electric service provider means an entity that offers electrical service to customers within the service territory of an electrical corporation, but does not include an electrical corporation, as defined in Section 218, does not include an entity that offers electrical service solely primarily to serve customer load consistent with subdivision (b) of Section 218, and does not include a public agency that offers electrical service to residential and small commercial customers within its jurisdiction, or within the service territory of a local publicly owned electric utility. Electric service provider includes the unregulated affiliates and subsidiaries of an electrical corporation, as defined in Section 218.
(b)Each electric service provider shall register with the commission. As a precondition to registration, the electric service provider shall provide, under oath, declaration, or affidavit, all of the following information to the commission:
(1)Legal name and any other names under which the electric service provider is doing business in California.
(2)Current telephone number.
(3)Current address.
(4)Agent for service of process.
(5)State and date of incorporation, if any.
(6)Number for a customer contact representative, or other personnel for receiving customer inquiries.
(7)Brief description of the nature of the service being provided.
(8)Disclosure of any civil, criminal, or regulatory sanctions or penalties imposed within the 10 years immediately prior to before registration, against the company or any owner, partner, officer, or director of the company pursuant to any state or federal consumer protection law or regulation, and of any felony convictions of any kind against the company or any owner, partner, officer, or director of the company. In addition, each electric service provider shall furnish the commission with fingerprints for those owners, partners, officers, and managers of the electric service provider specified by any commission decision applicable to all electric service providers. The commission shall submit completed fingerprint cards to the Department of Justice. Those fingerprints shall be available for use by the Department of Justice and the Department of Justice may transmit the fingerprints to the Federal Bureau of Investigation for a national criminal history record check. The commission may use information obtained from a national criminal history record check conducted pursuant to this section to determine an electric service providers eligibility for registration.
(9)Proof of financial viability. The commission shall develop uniform standards for determining financial viability and shall publish those standards for public comment no later than March 31, 1998. In determining the financial viability of the electric service provider, the commission shall take into account the number of customers the potential registrant expects to serve, the number of kilowatthours of electricity it expects to provide, and any other appropriate criteria to ensure that residential and small commercial customers have adequate recourse in the event of fraud or nonperformance.
(10)Proof of technical and operational ability. The commission shall develop uniform standards for determining technical and operational capacity and shall publish those standards for public comment no later than March 31, 1998.
(c)Any registration filing approved by the commission prior to before the effective date of this section which that does not comply in all respects with the requirements of subdivision (a) of Section 394 shall nevertheless continue in force and effect so long as if, within 90 days of the effective date of this section section, the electric service provider undertakes to supplement its registration filing to the satisfaction of the commission. Any registration that is not supplemented by the required information within the time set forth in this subdivision shall be suspended by the commission and shall not be reinstated until the commission has found the registration to be in full compliance with subdivision (a) of Section 394. (a).
(d)Any public agency offering aggregation services as provided for in Section 366 solely to retail electric customers within its jurisdiction that has registered with the commission prior to before the enactment of this section may voluntarily withdraw its registration to the extent that it is exempted from registration under this chapter.
(e)Before reentering the market, an electric service providers provider whose registration has been revoked shall file a formal application with the commission that satisfies the requirements set forth in Section 394.1 and demonstrates the fitness and ability of the electric service provider to comply with all applicable rules of the commission.
(f)Registration with the commission is an exercise of the licensing function of the commission, and does not constitute regulation of the rates or terms and conditions of service offered by electric service providers. Nothing in this part authorizes This part does not authorize the commission to regulate the rates or terms and conditions of service offered by electric service providers.
SEC. 5.Section 399.12 of the Public Utilities Code is amended to read:399.12.For purposes of this article, all of the following terms have the following meanings:
(a)Conduit hydroelectric facility means a facility for the generation of electricity that uses only the hydroelectric potential of an existing pipe, ditch, flume, siphon, tunnel, canal, or other manmade conduit that is operated to distribute water for a beneficial use.
(b)Balancing authority means the responsible entity that integrates resource plans ahead of time, maintains load-interchange generation balance within a balancing authority area, and supports interconnection frequency in real time.
(c)Balancing authority area means the collection of generation, transmission, and loads within the metered boundaries of the area within which the balancing authority maintains the electrical load-resource balance.
(d)California balancing authority is a balancing authority with control over a balancing authority area primarily located in this state and operating for retail sellers and local publicly owned electric utilities subject to the requirements of this article and includes the Independent System Operator (ISO) and a local publicly owned electric utility operating a transmission grid that is not under the operational control of the ISO. A California balancing authority is responsible for the operation of the transmission grid within its metered boundaries which that is not limited by the political boundaries of the State of California.
(e)Eligible renewable energy resource means an electrical generating facility that meets the definition of a renewable electrical generation facility in Section 25741 of the Public Resources Code, subject to the following:
(1)(A)An existing small hydroelectric generation facility of 30 megawatts or less shall be eligible only if a retail seller or local publicly owned electric utility procured the electricity from the facility as of December 31, 2005. A new hydroelectric facility that commences generation of electricity after December 31, 2005, is not an eligible renewable energy resource if it will cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(B)Notwithstanding subparagraph (A), a conduit hydroelectric facility of 30 megawatts or less that commenced operation before January 1, 2006, is an eligible renewable energy resource. A conduit hydroelectric facility of 30 megawatts or less that commences operation after December 31, 2005, is an eligible renewable energy resource so long as it does not cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(C)A facility approved by the governing board of a local publicly owned electric utility prior to before June 1, 2010, for procurement to satisfy renewable energy procurement obligations adopted pursuant to former Section 387, shall be certified as an eligible renewable energy resource by the Energy Commission pursuant to this article, if the facility is a renewable electrical generation facility as defined in Section 25741 of the Public Resources Code.
(D)(i)A small hydroelectric generation unit with a nameplate capacity not exceeding 40 megawatts that is operated as part of a water supply or conveyance system is an eligible renewable energy resource only for the retail seller or local publicly owned electric utility that procured the electricity from the unit as of December 31, 2005. No A unit shall not be eligible pursuant to this subparagraph if an application for certification is submitted to the Energy Commission after January 1, 2013. Only one retail seller or local publicly owned electric utility shall be deemed to have procured electricity from a given unit as of December 31, 2005.
(ii)Notwithstanding clause (i), a local publicly owned electric utility that meets the criteria of subdivision (j) of Section 399.30 may sell to another local publicly owned electric utility electricity from small hydroelectric generation units that qualify as eligible renewable energy resources under clause (i), and that electricity may be used by the local publicly owned electric utility that purchased the electricity to meet its renewables portfolio standard procurement requirements. The total of all those sales from the utility shall be no greater than 100,000 megawatthours of electricity.
(iii)The amendments made to this subdivision by the act adding this subparagraph are intended to clarify existing law and apply from December 10, 2011.
(2)(A)A facility engaged in the combustion of municipal solid waste shall not be considered an eligible renewable energy resource.
(B)Subparagraph (A) does not apply to generation before January 1, 2017, from a facility located in the County of Stanislaus County that was operational prior to before September 26, 1996.
(f)Procure means to acquire through ownership or contract.
(g)Procurement entity means any person or corporation authorized by the commission to enter into contracts to procure eligible renewable energy resources on behalf of customers of a retail seller pursuant to subdivision (f) of Section 399.13.
(h)(1)Renewable energy credit means a certificate of proof associated with the generation of electricity from an eligible renewable energy resource, issued through the accounting system established by the Energy Commission pursuant to Section 399.25, that one unit of electricity was generated and delivered by an eligible renewable energy resource.
(2)Renewable energy credit includes all renewable and environmental attributes associated with the production of electricity from the eligible renewable energy resource, except for an emissions reduction credit issued pursuant to Section 40709 of the Health and Safety Code and any credits or payments associated with the reduction of solid waste and treatment benefits created by the utilization use of biomass or biogas fuels.
(3)(A)Electricity generated by an eligible renewable energy resource attributable to the use of nonrenewable fuels, beyond a de minimis quantity used to generate electricity in the same process through which the facility converts renewable fuel to electricity, shall not result in the creation of a renewable energy credit. The Energy Commission shall set the de minimis quantity of nonrenewable fuels for each renewable energy technology at a level of no more than 2 percent of the total quantity of fuel used by the technology to generate electricity. The Energy Commission may adjust the de minimis quantity for an individual facility, up to a maximum of 5 percent, if it finds that all of the following conditions are met:
(i)The facility demonstrates that the higher quantity of nonrenewable fuel will lead to an increase in generation from the eligible renewable energy facility that is significantly greater than generation from the nonrenewable fuel alone.
(ii)The facility demonstrates that the higher quantity of nonrenewable fuels will reduce the variability of its electrical output in a manner that results in net environmental benefits to the state.
(iii)The higher quantity of nonrenewable fuel is limited to either natural gas or hydrogen derived by reformation of a fossil fuel.
(B)Electricity generated by a small hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (A) or (D) of paragraph (1) of subdivision (e).
(C)Electricity generated by a conduit hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (B) of paragraph (1) of subdivision (e).
(D)Electricity generated by a facility engaged in the combustion of municipal solid waste shall not result in the creation of a renewable energy credit. This subparagraph does not apply to renewable energy credits that were generated before January 1, 2017, by a facility engaged in the combustion of municipal solid waste located in the County of Stanislaus County that was operational prior to before September 26, 1996, and sold pursuant to contacts entered into before January 1, 2017.
(i)Renewables portfolio standard means the specified percentage of electricity generated by eligible renewable energy resources that a retail seller or a local publicly owned electric utility is required to procure pursuant to this article.
(j)Retail seller means an entity engaged in the retail sale of electricity to end-use customers located within the state, including any of the following:
(1)An electrical corporation, as defined in Section 218.
(2)A community choice aggregator. A community choice aggregator shall participate in the renewables portfolio standard program subject to the same terms and conditions applicable to an electrical corporation.
(3)An electric service provider, as defined in Section 218.3. The electric service provider shall be subject to the same terms and conditions applicable to an electrical corporation pursuant to this article. This paragraph does not impair a contract entered into between an electric service provider and a retail customer prior to before the suspension of direct access by the commission pursuant to Section 80110 of the Water Code.
(4)Retail seller does not include any of the following:
(A)A corporation or person employing cogeneration technology or producing electricity that is not an electrical corporation consistent with subdivision (b) of Section 218.(B)The Department of Water Resources acting in its capacity pursuant to Division 27 (commencing with Section 80000) of the Water Code.(C)A local publicly owned electric utility.(k)WECC means the Western Electricity Coordinating Council of the North American Electric Reliability Corporation, or a successor to the corporation.
SEC. 6.Section 780.5 of the Public Utilities Code is amended to read:780.5.The (a)Except as provided in subdivision (b), the commission shall require every residential unit in an apartment house or similar multiunit residential structure, condominium, and mobilehome park for which a building permit has been obtained on or after July 1, 1982, other than a dormitory or other housing accommodation provided by any postsecondary educational institution for its students or employees and other than farmworker housing, to be individually metered for electrical and gas service, except that separate metering for gas service is not required for residential units which are not equipped with gas appliances requiring venting or are equipped with only vented decorative appliances or which receive the majority of energy used for water or space heating from a solar energy system or through cogeneration technology. service.
(b)Notwithstanding subdivision (a), all of the following are not required to be individually metered for electrical and gas service:
(1)A dormitory or other housing accommodation provided by a postsecondary educational institution for its students or employees.
(2)Farmworker housing.
(3)An accessory dwelling unit, as defined in Section 66313 of the Government Code, if the owner of the property on which the accessory dwelling unit is located elects to have the accessory dwelling units electrical and gas services metered through existing or upgraded utility meters located on that property.
(4)With respect to gas service, a residential unit that is not equipped with a gas appliance that requires venting or is equipped with only a vented decorative appliance or that receives the majority of energy used for water or space heating from a solar energy system or through cogeneration technology.
(5)A new, significantly altered, or converted multiunit residential structure, condominium, or mobilehome park for which a building permit has been obtained on or after January 1, 2026, that includes the installation of a distributed energy system that is meant to offset all or a portion of the tenants usage, if each individual unit is submetered using a revenue grade meter.
SEC. 7.Section 8340 of the Public Utilities Code is amended to read:8340.For purposes of this chapter, all of the following terms have the following meanings:
(a)Baseload generation means electricity generation from a powerplant that is designed and intended to provide electricity at an annualized plant capacity factor of at least 60 percent.
(b)Combined-cycle natural gas with respect to a powerplant means the powerplant employs a combination of one or more gas turbines and steam turbines in which electricity is produced in the steam turbine from otherwise lost waste heat exiting from one or more of the gas turbines.
(c)Electric service provider means an electric service provider as defined in Section 218.3, but does not include corporations or persons employing cogeneration technology or producing electricity from other than a conventional power source that are not electrical corporations consistent with subdivision (b) of Section 218.
(d)Greenhouse gases means those gases listed in Section 38505 of the Health and Safety Code.
(e)Load-serving entity means every electrical corporation, electric service provider, or community choice aggregator serving end-use customers in the state.
(f)Long-term financial commitment means either a new ownership investment in baseload generation or a new or renewed contract with a term of five or more years, which includes procurement of baseload generation.
(g)Output-based methodology means a greenhouse gases emission performance standard that is expressed in pounds of greenhouse gases emitted per megawatthour and factoring in the useful thermal energy employed for purposes other than the generation of electricity.
(h)Plant capacity factor means the ratio of the electricity produced during a given time period, measured in kilowatthours, to the electricity the unit could have produced if it had been operated at its rated capacity during that period, expressed in kilowatthours.
(i)Powerplant means a facility for the generation of electricity, and includes one or more generating units at the same location.
(j)Zero- or low-carbon generating resource means an electrical generating resource that will generate electricity while producing emissions of greenhouse gases at a rate substantially below the greenhouse gases emission performance standard, as determined by the commission.
SEC. 8.Section 8373 is added to the Public Utilities Code, to read:8373.(a)A corporation or person operating a microgrid shall do both of the following:
(1)Obtain all necessary approvals from local authorities having jurisdiction to cross rights-of-way in order to provide electrical service to customers.
(2)Comply with all other local and state building and safety codes and standards.
(b)The Energy Commission may develop safety standards for microgrids and may issue optional guidelines for the governance and oversight of microgrids to local governments to streamline permitting and encourage scalability.
(c)(1)A microgrid shall not be subject to the jurisdiction of the commission with respect to rates, operations, or safety. The commission shall retain jurisdiction over the interconnection of a microgrid to the distribution system of a large electrical corporation. For purposes of its interconnection, a microgrid shall be treated as a single, controllable entity.
(2)A microgrid seeking interconnection to the distribution system of a large electrical corporation shall not be denied interconnection for the use of master metering if the microgrid is employing submetering at individual facilities or units and is otherwise compliant with Section 739.5.
(d)As used in this section, microgrid means a microgrid, as defined in Section 8370, that is operated by a corporation or person that is not an electrical corporation, as described in subdivision (b) of Section 218.
SEC. 9.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Section 8360 of the Public Utilities Code is amended to read:8360.It is the policy of the state to modernize the states electrical transmission and distribution system to maintain safe, reliable, efficient, and secure electrical service, with infrastructure that can meet future growth in demand and achieve all of the following, which together characterize a smart grid:(a)Increased use of cost-effective digital information and control technology to improve reliability, security, and efficiency of the electrical grid.(b)Dynamic optimization of grid operations and resources, including appropriate consideration for asset management and utilization of related grid operations and resources, with cost-effective full cyber security.(c)Deployment and integration of cost-effective distributed resources and generation, including renewable resources.(d)Development and incorporation of cost-effective demand response, demand-side resources, and energy-efficient resources.(e)Deployment of cost-effective smart technologies, including real time, automated, interactive technologies that optimize the physical operation of appliances and consumer devices for metering, communications concerning grid operations and status, and distribution automation.(f)Integration of cost-effective smart appliances and consumer devices.(g)Provide consumers with timely information and control options.(h)Develop standards for communication and interoperability of appliances and equipment connected to the electrical grid, including the infrastructure serving the grid.(i)Identification and lowering of unreasonable or unnecessary barriers to adoption of smart grid technologies, practices, and services.It is the policy of the state to modernize the states electrical transmission and distribution system to maintain safe, reliable, efficient, and secure electrical service, with infrastructure that can meet future growth in demand and achieve all of the following, which together characterize a smart grid:
(a)Increased use of cost-effective digital information and control technology to improve reliability, security, and efficiency of the electric electrical grid.
(b)Dynamic optimization of grid operations and resources, including appropriate consideration for asset management and utilization of related grid operations and resources, with cost-effective full cyber security.
(c)Deployment and integration of cost-effective distributed resources and generation, including renewable resources.
(d)Development and incorporation of cost-effective demand response, demand-side resources, and energy-efficient resources.
(e)Deployment of cost-effective smart technologies, including real time, automated, interactive technologies that optimize the physical operation of appliances and consumer devices for metering, communications concerning grid operations and status, and distribution automation.
(f)Integration of cost-effective smart appliances and consumer devices.
(g)Deployment and integration of cost-effective advanced electricity storage and peak-shaving technologies, including plug-in electric and hybrid electric vehicles, and thermal-storage air-conditioning.(h)(g)Provide consumers with timely information and control options.
(i)(h)Develop standards for communication and interoperability of appliances and equipment connected to the electric electrical grid, including the infrastructure serving the grid.
(j)(i)Identification and lowering of unreasonable or unnecessary barriers to adoption of smart grid technologies, practices, and services.
|
Date
|
Status
|
|---|---|
| Jul 16, 2026 | Chaptered by Secretary of State - Chapter 94, Statutes of 2026. |
| Jul 16, 2026 | Approved by the Governor. |
| Jul 15, 2026 | Enrolled and presented to the Governor at 11:15 a.m. |
| Jul 2, 2026 | In Assembly. Ordered to Engrossing and Enrolling. |
| Jul 2, 2026 | Read third time. Passed. Ordered to the Assembly. (Ayes 37. Noes 0. Page 5189.). |
| Jul 2, 2026 | Read third time. Passed. Ordered to the Assembly. (Ayes 37. Noes 0.). |
| Jun 30, 2026 | Read second time. Ordered to Consent Calendar. |
| Jun 29, 2026 | From committee: Be ordered to second reading file pursuant to Senate Rule 28.8 and ordered to Consent Calendar. |
| Jun 16, 2026 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 17. Noes 0.) (June 16). Re-referred to Com. on APPR. |
| Jun 3, 2026 | Referred to Com. on E., U & C. |
| May 21, 2026 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 21, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 68. Noes 0. Page 5229.) |
| May 21, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 68. Noes 0.) |
| May 14, 2026 | Read second time. Ordered to Consent Calendar. |
| May 13, 2026 | From committee: Do pass. To Consent Calendar. (Ayes 15. Noes 0.) (May 13). |
| Apr 23, 2026 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 18. Noes 0.) (April 22). Re-referred to Com. on APPR. |
| Apr 20, 2026 | Re-referred to Com. on U. & E. |
| Apr 16, 2026 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Apr 13, 2026 | Re-referred to Com. on U. & E. |
| Apr 9, 2026 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Mar 9, 2026 | Referred to Com. on U. & E. |
| Feb 20, 2026 | From printer. May be heard in committee March 22. |
| Feb 19, 2026 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Jul 2, 2026 | Consent Calendar 2nd AB2175 Garcia | Senate Floor |
Passed |
|
| Jun 16, 2026 | Do pass, but first be re-referred to the Committee on [Appropriations] with the recommendation: To Consent Calendar | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
|
| May 21, 2026 | AB 2175 Garcia Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| May 13, 2026 | Do pass. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 22, 2026 | Do pass and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar | Assembly Standing Committee on Utilities and Energy |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 23 Individual | ** Support | |
| 350 Bay Area | ** Support | |
| 350 Conejo/San Fernando Valley | ** Support | |
| 350 Contra Costa Action | ** Support | |
| 350 Humboldt | ** Support | |
| 350 South Bay Los Angeles | ** Support | |
| 350 Southland Legislative Alliance | ** Support | |
| A1 Sun | ** Support | |
| Albany Climate Action Coalition | ** Support | |
| Bay Area Clean Air Coalition | ** Support | |
| Berkeley Electrification Working Group | ** Support | |
| California Alliance for Community Energy | ** Support | |
| California Interfaith Power & Light | ** Support | |
| Californians for Energy Choice | ** Support | |
| California State Association Of Electrical Workers | ** Against | |
| Center For Biological Diversity | ** Support | |
| Clean Coalition | ** Support | |
| cleanearth4kids.org | ** Support | |
| Climate Action Mendocino | ** Support | |
| Coalition of California Utility Employees | ** Against | |
| Collective Resilience | ** Support | |
| Community Renewable Solution | ** Support | |
| Fresnans Against Fracking | ** Support | |
| Greenbank Associates | ** Support | |
| Green Solutions & Technologies | ** Support | |
| Ivy Energy | ** Support | |
| Long Beach Gray Panthers | ** Support | |
| Monterey County Renters United | ** Support | |
| Oil & Gas Action Network | ** Support | |
| Pacific Gas And Electric Company And Its Affiliated Entities | ** Against | |
| Project Green Home | ** Support | |
| Reclaim Our Power! | ** Support | |
| recolte energy | ** Support | |
| San Diego 350 | ** Support | |
| Santa Cruz Climate Action Network | ** Support | |
| Solano County Democratic Central Committee | ** Support | |
| Solar Rights Alliance | ** Support | |
| Sunflower Alliance | ** Support | |
| Sun Light & Power | ** Support | |
| Sun Run | ** Support | |
| Sustainable Systems Research Foundation | ** Support | |
| The Climate Center | ** Support | |
| Uniting the Central Coast for Action | ** Support | |
| Ventura Energy | ** Support | |
| Wellstone Democratic Club, Sacramento | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | AB 2175 |
CONSENT
Bill No: AB 2175
Author: Garcia (D)
Amended: 4/16/26 in Assembly
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 17-0, 6/16/26
AYES: Allen, Ochoa Bogh, Archuleta, Arreguín, Becker, Caballero, Gonzalez, Grove, Hurtado, McNerney, Niello, Reyes, Richardson, Rubio, Stern, Strickland, Wahab
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 68-0, 5/21/26 (Consent) - See last page for vote
SUBJECT: Renewable electrical generation facilities: multiple meters: aggregation: logistics businesses and manufacturing businesses
SOURCE: Author
DIGEST:
This bill explicitly states logistics and manufacturing businesses are eligible customer-generators for the Net Billing Tariff-Aggregation (NBT-A) program, should the California Public Utilities Commission (CPUC) determine to extend the program.
ANALYSIS:
Existing law:
- Establishes and vests the CPUC with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires that all charges demanded or received by any public utility for any product, commodity or service be just and reasonable. (Public Utilities Code §451)
- Requires each electrical utility, including each electrical corporation, local publicly owned electric utility (POU), electrical cooperative, or other entity that offers electrical service, except as specified, to develop a standard contract or tariff that provides for net energy metering (NEM), which, among other things, compensates each eligible customer-generator, as defined, for the electricity it generated during a preceding 12-month period that exceeds the electricity supplied by the electrical utility through the electrical grid to the eligible customer-generator during that same period, as provided. Requires each electrical utility to make the contract or tariff available to eligible customer-generators, upon request, on a first-come-first-served basis until the time that the total rated generating capacity used by those eligible customer-generators exceeds five percent of the electrical utility’s aggregate customer peak demand, except as specified. This contract or tariff is commonly known as NEM 1.0. (Public Utilities Code §2827)
- Authorizes an eligible customer-generator with multiple meters to aggregate the electrical load of the meters located on the property where the renewable electrical generation facility is located and on all property adjacent or contiguous to the property on which the renewable electrical generation facility is located, if those properties are solely owned, leased, or rented by the eligible customer-generator, as provided. (Public Utilities Code §2827 (h)(4)(A))
- Requires the CPUC to develop an additional standard contract or tariff, which may include NEM, for eligible customer-generators that are customers of large electrical corporations, as defined. Requires each large electrical corporation to offer this standard contract or tariff to its eligible customer-generators beginning July 1, 2017, or before that date if ordered to do so by the CPUC because it has reached the above-mentioned five percent NEM 1.0 program limit, and prohibits limiting the amount of generating capacity or the number of new eligible customer-generators entitled to receive service pursuant to this standard contract or tariff, as specified. This contract or tariff is commonly known as NEM 2.0. Authorizes the CPUC to revise the standard contract or tariff as appropriate to achieve specified objectives. (Public Utilities Code §2827.1)
This bill:
- Requires the CPUC, for purposes of certain NEM contracts or tariffs, to ensure that logistics businesses and manufacturing businesses are eligible customer-generators for purposes of aggregating multiple meters, as described above, if the CPUC extends the application of that provision.
- Includes nonsubstantive code clean-up.
Background
NEM tariff. Electric utility customers have helped fund the cost of customer-sited electricity generation from renewable resources, which is largely electricity generated by rooftop solar. The vast majority of rooftop solar customers are enrolled in NEM 1.0 or NEM successor tariffs, including NEM 2.0 and net billing tariff (NBT) established under Public Utilities Code §§2827 and 2827.1, respectively. The NEM tariff supports onsite renewable energy (largely rooftop solar) installations designed to offset a portion, or all, of the customer’s electrical energy usage. Under NEM, customers receive a bill credit (in dollars) based on the retail rate (including generation, transmission, and distribution rate components) for any excess generation in kilowatt hours (kWh) that is exported back to the electric grid. In periods when a customer’s bill is negative (because the amount of energy the solar system exported to the grid exceeded the amount of energy consumed by the customer), the bill credits are carried forward up to one year, at which point customers may elect to receive net surplus compensation for any electricity produced in excess of on-site energy usage. Customers taking service under NEM 2.0 pay the cost to connect to the grid, take service on a “time-of-use” rate plan, and pay “non-bypassable” charges that are not offset with surplus energy credits.
Successor tariff adopted. In August 2020, the CPUC initiated Rulemaking (R. 20-08-020) to develop a successor to the NEM 2.0 tariff, as part of the requirement in statute and a commitment in a previous decision to review the current tariff to address the shift in costs to nonparticipating customers. In December 2022 CPUC Decision (D. 22-12-056), the CPUC adopted a new version of the NEM tariff, now known as the NBT, which adjusts the compensation for solar energy electricity exported back to the electric grid with a reduced amount of compensation from systems that were installed after to April 15, 2023. The CPUC decision revises the NEM tariff to improve price signals by better aligning them with the electric grid’s conditions, both day and night. The updated billing structure of the tariff is designed to optimize grid use by the tariff’s customers and incentivize adoption of combined solar and storage systems.
About NBT-A. Pursuant to SB 594 (Wolk, Chapter 610, Statutes of 2012), the CPUC established the net energy metering aggregation (NEMA) subtariff of the NEM tariff to allow an eligible customer-generator with multiple meters to aggregate the electrical load of the meters located on the property where the generation facility is located or on property contiguous to that with the generation facility. The legislation provided that a customer could install one generation facility sized to serve the entire load of these meters (up to one megawatt (MW)) as opposed to separate facilities at each meter. This is predicated on the CPUC determining that aggregating the load from multiple meters would not result in an increase in the costs for customers not participating in the NEMA tariff. Customers who elect to participate in NEMA are prohibited from receiving net surplus electricity compensation. In the NEM proceeding, electric utilities reported having about 13,000 properties interconnected to the grid under a NEMA subtariff with a cumulative solar capacity of about 1,000 MW. Electric utilities reported that combined solar and storage installations participating in NEMA are about 181 properties of the 13,000 NEMA participating properties. The NBT-A tariff was established in 2023 decision (D.23-11-068), adjusted to reflect changes made in the compensation under the NBT decision and emphasized the CPUC was not required by statute to continue the program. The CPUC decided to continue the aggregation tariff to optimize land resources and provide these additional benefits to the subtariff customers.
Comments
Need for this bill. According to the author:
AB 2175 amends Section 2827 of the Public Utilities Code to clarify that logistics and manufacturing businesses are eligible customer-generators under California’s Net Energy Metering (NEM) program if the California Public Utilities Commission (CPUC) elects to extend the multiple-meter load aggregation program. …By making this clarification, the amendment ensures fair access to clean energy programs, encourages private investment, and supports progress toward the state’s climate and energy goals. It also represents an important step toward making microgrids a more practical and widespread reality for Californians by enabling large-scale users to better generate and manage distributed energy across interconnected systems. At the same time, it preserves all existing safeguards by maintaining CPUC authority to evaluate ratepayer impacts, ensure grid reliability, and implement the program in a balanced and cost-effective manner.
NBT-A for logistics and warehouse businesses. This bill makes it explicit that logistics and warehouse businesses can participate in the NBT-A program. The goal of the author and proponents is to afford these businesses, many which occupy large parcels of land, the opportunity to support their efforts to decarbonize by electrifying some of their operations. The NBT-A tariff would help them install solar on one parcel to also benefit contiguous parcels they own. It’s not clear that these businesses have been precluded from the NBT-A, but this bill makes it clear they are eligible for the program.
Related/Prior Legislation
AB 1104 (Pellerin, Chapter of 632, Statutes of 2025) specified that, for the construction of a renewable electrical generation facility and associated battery storage, the contractor who enters into a contract with the entity, not the entity itself, is the awarding body only for limited purposes. The bill also specified which public works requirements apply to such construction projects and authorized a renewable electrical generation facility to remain eligible to receive service pursuant to a standard contract or tariff, regardless of a contractor’s willful violation of prevailing wage requirements, if restitution has been made to the affected workers and all associated penalties and fines have been paid.
SB 1374 (Becker, 2024) proposed changes to a November 2023 decision by the CPUC concerning the NEM program, including the compensation treatment of electric utility customers of apartment buildings and public schools who install solar and other renewable generating facilities on the customer’s side of the meter. The bill was vetoed.
AB 1070 (Lorena Gonzalez, Chapter 662, Statutes of 2017) required the Contractors State Licensing Board in collaboration with the CPUC to develop and make available a "solar energy system disclosure document" for solar energy customers, compile an annual report documenting consumer complaints relating to solar contractors and develop standardized inputs and assumptions to be used in the calculation and presentation of electric utility bill savings to a consumer.
AB 327 (Perea, Chapter 611, Statutes of 2013) instituted several rate reforms and required the CPUC to adopt a successor NEM tariff no later than December 31, 2015.
SB 656 (Alquist, Chapter 369, Statutes of 1995) required every electric utility, including electrical corporations, which offer residential service to develop a standard tariff providing for NEM to eligible customer-generators. Applies only to those systems that produce up to 10 KW and would be restricted to 0.1% of a utility’s peak demand.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 6/29/26)
350 Bay Area
350 Conejo/San Fernando Valley
350 Contra Costa Action
350 Humboldt
350 South Bay Los Angeles
350 Southland Legislative Alliance
A1 Sun
Albany Climate Action Coalition
Bay Area Clean Air Coalition
Berkeley Electrification Working Group
California Interfaith Power & Light
Californians for Energy Choice
Center for Biological Diversity
Clean Coalition
CleanEarth4Kids.org
Climate Action Mendocino
Collective Resilience
Community Renewable Solution
Fresnans Against Fracking
Green Solutions & Technologies
Greenbank Associates
Ivy Energy
Long Beach Gray Panthers
Monterey County Renters United
Oil & Gas Action Network
Project Green Home
Reclaim Our Power!
Récolte Energy
San Diego 350
Santa Cruz Climate Action Network
Solano County Democratic Central Committee
Solar Rights Alliance
Sun Light & Power
Sun Run
Sunflower Alliance
Sustainable Systems Research Foundation
The Climate Center
Uniting the Central Coast for Action
Ventura Energy
23 Individual
OPPOSITION: (Verified 6/29/26)
California State Association of Electrical Workers
Coalition of California Utility Employees
ARGUMENTS IN SUPPORT: The arguments in support generally argue for greater deployment of microgrids and policies that ensure access by all customers to clean energy resources.
ARGUMENTS IN OPPOSITION: The arguments from the opposition reflect language that was previously in this bill.
ASSEMBLY FLOOR: 68-0, 5/21/26
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Castillo, Connolly, Davies, DeMaio, Dixon, Elhawary, Ellis, Flora, Fong, Gallagher, Gipson, Jeff Gonzalez, Mark González, Hadwick, Haney, Harabedian, Hart, Irwin, Jackson, Johnson, Kalra, Krell, Lee, Macedo, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ransom, Michelle Rodriguez, Rogers, Blanca Rubio, Sanchez, Schiavo, Sharp-Collins, Solache, Soria, Stefani, Ta, Tangipa, Valencia, Wallis, Ward, Zbur, Rivas
NO VOTE RECORDED: Arambula, Chen, Gabriel, Garcia, Hoover, Lackey, Lowenthal, Ramos, Celeste Rodriguez, Schultz, Wicks, Wilson
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
7/1/26 16:55:10
**** END ****
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Benjamin Allen, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 6/16/2026
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill explicitly states logistics and manufacturing businesses are eligible customer-generators for the Net Billing Tariff- Aggregation (NBT-A) program, should the California Public Utilities Commission (CPUC) determine to extend the program.
ANALYSIS:
Existing law:
- Establishes and vests the CPUC with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires that all charges demanded or received by any public utility for any product, commodity or service be just and reasonable. (Public Utilities Code §451)
- Requires each electrical utility, including each electrical corporation, local publicly owned electric utility (POU), electrical cooperative, or other entity that offers electrical service, except as specified, to develop a standard contract or tariff that provides for net energy metering (NEM), which, among other things, compensates each eligible customer-generator, as defined, for the electricity it generated during a preceding 12-month period that exceeds the electricity supplied by the electrical utility through the electrical grid to the eligible customer-generator during that same period, as provided. Requires each electrical utility to make the contract or tariff available to eligible customer-generators, upon request, on a first-come-first-served basis until the time that the total rated generating capacity used by those eligible customer-generators exceeds five percent of the electrical utility’s aggregate customer peak demand, except as specified. This contract or tariff is commonly known as NEM 1.0. (Public Utilities Code §2827)
- Authorizes an eligible customer-generator with multiple meters to aggregate the electrical load of the meters located on the property where the renewable electrical generation facility is located and on all property adjacent or contiguous to the property on which the renewable electrical generation facility is located, if those properties are solely owned, leased, or rented by the eligible customer-generator, as provided. (Public Utilities Code §2827 (h)(4)(A))
- Requires the CPUC to develop an additional standard contract or tariff, which may include NEM, for eligible customer-generators that are customers of large electrical corporations, as defined. Requires each large electrical corporation to offer this standard contract or tariff to its eligible customer-generators beginning July 1, 2017, or before that date if ordered to do so by the CPUC because it has reached the above-mentioned five percent NEM 1.0 program limit, and prohibits limiting the amount of generating capacity or the number of new eligible customer-generators entitled to receive service pursuant to this standard contract or tariff, as specified. This contract or tariff is commonly known as NEM 2.0. Authorizes the CPUC to revise the standard contract or tariff as appropriate to achieve specified objectives. (Public Utilities Code §2827.1)
This bill:
- Requires the CPUC, for purposes of certain NEM contracts or tariffs, to ensure that logistics businesses and manufacturing businesses are eligible customer-generators for purposes of aggregating multiple meters, as described above, if the CPUC extends the application of that provision.
- Includes nonsubstantive code clean-up.
Background
NEM tariff. Electric utility customers have helped fund the cost of customer-sited electricity generation from renewable resources, which is largely electricity generated by rooftop solar. The vast majority of rooftop solar customers are enrolled in NEM 1.0 or NEM successor tariffs, including NEM 2.0 and net billing tariff (NBT) established under Public Utilities Code §§2827 and 2827.1, respectively. The NEM tariff supports onsite renewable energy (largely rooftop solar) installations designed to offset a portion, or all, of the customer’s electrical energy usage. Under NEM, customers receive a bill credit (in dollars) based on the retail rate (including generation, transmission, and distribution rate components) for any excess generation in kilowatt hours (kWh) that is exported back to the electric grid. In periods when a customer’s bill is negative (because the amount of energy the solar system exported to the grid exceeded the amount of energy consumed by the customer), the bill credits are carried forward up to one year, at which point customers may elect to receive net surplus compensation for any electricity produced in excess of on-site energy usage. Customers taking service under NEM 2.0 pay the cost to connect to the grid, take service on a “time-of-use” rate plan, and pay “non-bypassable” charges that are not offset with surplus energy credits.
Successor tariff adopted. In August 2020, the CPUC initiated Rulemaking (R. 20-08-020) to develop a successor to the NEM 2.0 tariff, as part of the requirement in statute and a commitment in a previous decision to review the current tariff to address the shift in costs to nonparticipating customers. In December 2022 CPUC Decision (D. 22-12-056), the CPUC adopted a new version of the NEM tariff, now known as the NBT, which adjusts the compensation for solar energy electricity exported back to the electric grid with a reduced amount of compensation from systems that were installed after to April 15, 2023. The CPUC decision revises the NEM tariff to improve price signals by better aligning them with the electric grid’s conditions, both day and night. The updated billing structure of the tariff is designed to optimize grid use by the tariff’s customers and incentivize adoption of combined solar and storage systems.
About NBT-A. Pursuant to SB 594 (Wolk, Chapter 610, Statutes of 2012), the CPUC established the net energy metering aggregation (NEMA) subtariff of the NEM tariff to allow an eligible customer-generator with multiple meters to aggregate the electrical load of the meters located on the property where the generation facility is located or on property contiguous to that with the generation facility. The legislation provided that a customer could install one generation facility sized to serve the entire load of these meters (up to one megawatt (MW)) as opposed to separate facilities at each meter. This is predicated on the CPUC determining that aggregating the load from multiple meters would not result in an increase in the costs for customers not participating in the NEMA tariff. Customers who elect to participate in NEMA are prohibited from receiving net surplus electricity compensation. In the NEM proceeding, electric utilities reported having about 13,000 properties interconnected to the grid under a NEMA subtariff with a cumulative solar capacity of about 1,000 MW. Electric utilities reported that combined solar and storage installations participating in NEMA are about 181 properties of the 13,000 NEMA participating properties. The NBT-A tariff was established in 2023 decision (D.23-11-068), adjusted to reflect changes made in the compensation under the NBT decision and emphasized the CPUC was not required by statute to continue the program. The CPUC decided to continue the aggregation tariff to optimize land resources and provide these additional benefits to the subtariff customers.
Comments
Need for this bill. According to the author:
AB 2175 amends Section 2827 of the Public Utilities Code to clarify that logistics and manufacturing businesses are eligible customer-generators under California’s Net Energy Metering (NEM) program if the California Public Utilities Commission (CPUC) elects to extend the multiple-meter load aggregation program. …By making this clarification, the amendment ensures fair access to clean energy programs, encourages private investment, and supports progress toward the state’s climate and energy goals. It also represents an important step toward making microgrids a more practical and widespread reality for Californians by enabling large-scale users to better generate and manage distributed energy across interconnected systems. At the same time, it preserves all existing safeguards by maintaining CPUC authority to evaluate ratepayer impacts, ensure grid reliability, and implement the program in a balanced and cost-effective manner.
NBT-A for logistics and warehouse businesses. This bill makes it explicit that logistics and warehouse businesses can participate in the NBT-A program. The goal of the author and proponents is to afford these businesses, many which occupy large parcels of land, the opportunity to support their efforts to decarbonize by electrifying some of their operations. The NBT-A tariff would help them install solar on one parcel to also benefit contiguous parcels they own. It’s not clear that these businesses have been precluded from the NBT-A, but this bill makes it clear they are eligible for the program.
Prior/Related Legislation
AB 1104 (Pellerin, Chapter of 632, Statutes of 2025) specified that, for the construction of a renewable electrical generation facility and associated battery storage, the contractor who enters into a contract with the entity, not the entity itself, is the awarding body only for limited purposes. The bill also specified which public works requirements apply to such construction projects and authorized a renewable electrical generation facility to remain eligible to receive service pursuant to a standard contract or tariff, regardless of a contractor’s willful violation of prevailing wage requirements, if restitution has been made to the affected workers and all associated penalties and fines have been paid.
SB 1374 (Becker, 2024) proposed changes to a November 2023 decision by the CPUC concerning the NEM program, including the compensation treatment of electric utility customers of apartment buildings and public schools who install solar and other renewable generating facilities on the customer’s side of the meter. The bill was vetoed.
AB 1070 (Lorena Gonzalez, Chapter 662, Statutes of 2017) required the Contractors State Licensing Board in collaboration with the CPUC to develop and make available a "solar energy system disclosure document" for solar energy customers, compile an annual report documenting consumer complaints relating to solar contractors and, develop standardized inputs and assumptions to be used in the calculation and presentation of electric utility bill savings to a consumer.
AB 327 (Perea, Chapter 611, Statutes of 2013) instituted several rate reforms and required the CPUC to adopt a successor NEM tariff no later than December 31, 2015.
SB 656 (Alquist, Chapter 369, Statutes of 1995) required every electric utility, including electrical corporations, which offer residential service to develop a standard tariff providing for NEM to eligible customer-generators. Applies only to those systems that produce up to 10 KW and would be restricted to 0.1 percent of a utility’s peak demand.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
350 Bay Area
350 Conejo/San Fernando Valley
350 Contra Costa Action
350 Humboldt
350 South Bay Los Angeles
350 Southland Legislative Alliance
A1 Sun
Albany Climate Action Coalition
Bay Area Clean Air Coalition
Berkeley Electrification Working Group
California Interfaith Power & Light
Californians for Energy Choice
Center for Biological Diversity
Clean Coalition
CleanEarth4Kids.org
Climate Action Mendocino
Collective Resilience
Community Renewable Solution
Fresnans Against Fracking
Green Solutions & Technologies
Greenbank Associates
Ivy Energy
Long Beach Gray Panthers
Monterey County Renters United
Oil & Gas Action Network
Project Green Home
Reclaim Our Power!
Récolte Energy
San Diego 350
Santa Cruz Climate Action Network
Solano County Democratic Central Committee
Solar Rights Alliance
Sun Light & Power
Sun Run
Sunflower Alliance
Sustainable Systems Research Foundation
The Climate Center
Uniting the Central Coast for Action
Ventura Energy
23 Individual
OPPOSITION:
California State Association of Electrical Workers
Coalition of California Utility Employees
ARGUMENTS IN SUPPORT: The arguments in support generally argue for greater deployment of microgrids and to ensure access by all customers to clean energy resources.
ARGUMENTS IN OPPOSITION: The arguments from the opposition reflect language that was previously in this bill.
-- END --
Date of Hearing: May 13, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 2175
Author:(Garcia) – As Amended Ver:April 16, 2026
Policy Committee: | Utilities and Energy | Vote: | 18 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill requires the California Public Utilities Commission (CPUC) to ensure logistics and manufacturing businesses are eligible customer-generators for the Net Billing Tariff- Aggregation (NBT-A) program, should the CPUC determine to extend the program.
FISCAL EFFECT:
Any work created by this bill for the CPUC, if the CPUC if the extends the NBT-A program, will be incidental to work the CPUC would already need to undertake. Therefore, the costs of this bill are minor and absorbable.
COMMENTS:
Under the state’s existing net energy metering (NEM) program, the CPUC allows a participating “customer-generator” to apply electricity generated on one parcel controlled by the customer-generator to electrical meters that provide service to the customer-generator on nearby parcels, provided certain conditions are met. This is sometimes called NEM aggregation. One way to envision a typical NEM aggregation setup is to imagine a solar array, interconnected to the larger electrical grid, in a field owned by a customer generator and several properties, also owned or operated by the customer-generator, that are adjacent to the field with the solar array and each of which has a unique meter to measure electrical service provided to each property. Such a setup is illustrated below in an image included in the policy committee analysis of this bill:
In 2023, the CPUC adopted a decision that revised the NEM program, but that decision did not address NEM aggregation. Rather, the CPUC decision expressed the CPUC’s intention to revisit NEM aggregation tariffs (the NBT-A program) at a later time.
The author states this bill will “clarify” that logistics and manufacturing businesses are eligible customer-generators for the NBT-A program, if the CPUC extends the program. According to the author:
The amendment ensures fair access to clean energy programs, encourages private investment, and supports progress toward the state’s climate and energy goals. It also represents an important step toward making microgrids a more practical and widespread reality for Californians by enabling large-scale users to better generate and manage distributed energy across interconnected systems.
The bill is supported by a number of environmental organizations that, like the author, view this bill as enabling use of “microgrids,” especially by the large warehousing and logistics facilities.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: April 22, 2026
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
ABPCA Bill Id:AB 2175 (
Author:Garcia) – As Amended Ver:April 16, 2026
SUBJECT: Renewable electrical generation facilities: multiple meters: aggregation: logistics businesses and manufacturing businesses
SUMMARY: Requires the California Public Utilities Commission (CPUC) to ensure logistics and manufacturing businesses are eligible customer-generators for the Net Billing Tariff- Aggregation (NBT-A) program, should the CPUC determine to extend the program.
EXISTING LAW:
- Requires every electric utility, defined to include electrical corporations, local publicly owned electric utilities, and electrical cooperatives, to develop a standard contract or tariff for NEM, for generation by a renewable electrical generation facility, and to make this contract or tariff available to eligible customer-generators, upon request on a first-come-first-served basis until the time that the total rated generating capacity used by eligible customer generators exceeds five percent of the electric utility’s aggregate customer peak demand. (Public Utilities Code § 2827)
- Requires the NEM calculation for eligible customer-generators to be made by measuring the difference between the electricity supplied to the eligible customer-generator and the electricity generated by the eligible customer-generator and fed back to the electrical grid over a 12-month period. (Public Utilities Code § 2827(h))
- Defines “eligible customer-generator” as a residential customer, small commercial customer (as specified), or commercial, industrial, or agricultural customer of an electric utility, who uses a renewable electrical generation facility, or a combination of those facilities, with a total capacity of not more than one megawatt, that is located on the customer’s owned, leased, or rented premises, and is interconnected and operates in parallel with the electrical grid, and is intended to primarily offset part or all of the customer’s own electrical requirements. (Public Utilities Code § 2827)
- Provides that an eligible customer-generator with multiple meters may elect to aggregate the electrical load of the meters located on the property where the renewable electrical generation facility is located and on all property adjacent or contiguous to the property on which the renewable electrical generation facility is located, if those properties are solely owned, leased, or rented by the eligible customer-generator. Makes customer-generators electing to aggregate the electric load permanently ineligible to receive net surplus compensation. This statute was implemented via the Net Energy Metering Aggregation (NEMA) subtariff. (Public Utilities Code § 2827(h)(4)(A)(B))
- Requires the CPUC, by September 30, 2013, to determine whether allowing eligible customer-generators to aggregate their load from multiple meters will not result in any increase in the expected revenue obligations of customers who are not eligible customer-generators. (Public Utilities Code § 2827(h)(4)(D))
- Provides that parcels that are divided by a street, highway, or public thoroughfare are considered contiguous, provided they are otherwise contiguous and under the same ownership. ((Public Utilities Code § 2827(h)(4)(F))
- Authorizes an eligible customer-generator to elect to aggregate the electrical load of multiple meters if the renewable generation facility, or a combination of those facilities, has a total generating capacity of not more than one megawatt (MW). (Public Utilities Code § 2827(h)(4)(G))
- Requires, if the CPUC determines there are cost or revenue obligations for an electrical corporation that may not be recovered from customer-generators participating in NEM, those obligations must remain within the customer class from which any shortfall occurred and prohibit those obligations from being shifted to any other customer class. (Public Utilities Code § 2827(k))
- Requires the CPUC, for a large electrical corporation, as defined, to have developed a second standard contract or tariff to provide NEM to additional eligible customer-generators in the electrical corporation’s service territory and imposes no limitation on the number of new eligible customer-generators entitled to receive service pursuant to this second standard contract or tariff. (Public Utilities Code § 2827.1)
- Requires the CPUC to ensure that the second standard contract or tariff made available to eligible customer-generators by large electrical corporations ensures that customer-sited renewable distributed generation continues to grow sustainably. Requires the CPUC, in developing this standard contract or tariff, to include specific alternatives designed for growth among residential customers in disadvantaged communities. (Public Utilities Code § 2827.1(b)(1))
FISCAL EFFECT: Unknown. This bill is keyed fiscal and will be referred to the Assembly Committee on Appropriations for its review.
BACKGROUND:
Net Energy Metering 101 – California’s net energy metering (NEM) program started in 1997, prompted by SB 656 (Alquist, Chapter 369, Statutes of 1995). It allows customers who install eligible renewable electrical generation facilities to serve onsite energy needs and receive credits on their electric bills for surplus energy sent to the electric grid. Most customer-sited, grid-connected solar in California is interconnected through NEM tariffs. Enrollment in the first NEM program, now colloquially known as “NEM 1.0,” was phased out between 2016 and 2017. NEM 1.0 was not meant to be cost-effective. Rather, the NEM tariff and the larger state program was meant to encourage adoption of rooftop solar so that manufacturing and installation costs could come down. This effort was successful: rooftop solar installation grew considerably from 2006 through 2012.
The Legislature called for the revision of NEM 1.0 per AB 327 (Perea, Chapter 611, Statutes of 2013) primarily to address the cost associated with the full retail credits available under the tariff. The CPUC responded with what is commonly referred to as NEM 2.0 in 2016. Customers taking service under that tariff – NEM 2.0 – pay the cost to connect to the grid; take service on a “time-of-use” rate plan; and pay “non-bypassable” charges that are not offset with surplus energy credits. On August 27, 2020, the CPUC initiated Rulemaking 20-08-020 to develop a successor to the NEM 2.0 tariff, as part of the requirement in statute and a commitment in a previous decision to review the current tariff to address the shift in costs to nonparticipating customers. The CPUC released a proposed decision in December 2021.[1] However, the final decision was delayed while the CPUC considered party comments and evaluated alternatives. On December 15, 2022, the CPUC adopted a new decision establishing the Net Billing Tariff (NBT), or colloquially NEM 3.0.[2]
The NBT applied to customers who submitted an interconnection application on or after April 15, 2023. The NBT made a number of changes from NEM 2.0, replacing export compensation tied to the retail rate with the avoided cost calculator (ACC) rate. The retail rate is typically a fixed amount, around 30-40¢/kWh, depending on service territory.[3] The ACC-calculated rate is variable, changing for each hour per month, with different values on weekends versus weekdays. These values are meant to track grid conditions, and can range from 0.03-0.05¢/kWh on the low end for most months of the year to over $1-$4/kWh on the high end for select evenings (5-7pm) in August-October.[4]
The NBT eliminated the netting interval, meaning customers’ imports on the first meter channel are charged the import retail rate (fixed, usually higher prices), and all recorded exports on the second meter channel are credited the retail export compensation rate (variable, only high during certain evenings).[5] The consequence of eliminating the netting interval is that behind-the-meter consumption is incentivized (it effectively earns the retail rate), encouraging customers to install both electric vehicle charging equipment and battery storage paired with their solar. The NBT decision also did not affect existing rooftop solar customers; those legacy NEM 1.0 and NEM 2.0 customers remain on their tariff. The NBT decision also did not include any charges unique to solar customers (despite early draft decisions doing that). The result of these changes led to a drop in the compensation rooftop solar customers will receive, increasing the payback period to 9 years.[6]
According to the CPUC, as of 2021, the NEM program had enabled 1.3 million customer installations, equating to roughly 10 gigawatts (GWs) of customer-sited renewable generation, almost all of which is rooftop solar. Now, NEM systems reduce the demand on the electric grid by as much as 25% during midday when the sun is shining.[7]
NEM Configurations – While the December 2022 NBT decision2 focused on single-meter properties/customers, a subsequent decision[8] focused on NEM arrangements serving multiple meters: the Virtual Net Energy Metering (VNEM) tariff, and the Net Energy Metering Aggregation (NEMA) subtariff. It is this subsequent decision from November 2023, and its relation to NEMA, that is the subject of this bill.
As shown in Figure 1, in a traditional NEM arrangement, a customer’s solar system (1) is located on the same side of the meter (2) as the customer’s load. Any electricity generated in excess of that serving onsite load is sent to the grid (3) and compensated at a specified export rate.
Figure 1: Schematic of various NEM tariff arrangements, showing traditional NEM (left), VNEM (center), and NEMA (right).
In the NEMA tariff system, the solar facility may be installed onsite or on adjacent or contiguous properties (1), serving a single customer with multiple meters on these adjacent or contiguous properties (2), and sized relative to load such that participating customers receive no net surplus compensation for their generated electricity. The customer receives a credit determined dynamically (every 15 mins) based on each benefiting meter’s usage allocation for each month.
NEMA was adopted pursuant to SB 594 (Wolk, Chapter 610, Statutes of 2012) to allow customers the ability to install one generation facility sized to serve the entire load of these meters (up to one megawatt) as opposed to separate facilities at each meter. This arrangement acknowledged that for many, it was too cost-prohibitive to require individual solar facilities behind each meter on the customer’s account. Per statute, NEMA is predicated on the CPUC making a determination that aggregating the load from multiple meters would not result in an increase in the costs for customers not participating in the NEMA tariff. Customers who elect to participate in NEMA are prohibited from receiving net surplus electricity compensation. As a subtariff of NEM, the CPUC determined in Resolution E-4854 that the statewide cap of 5,256 MW (allocated per IOU) and sunset of July 1, 2017,[9] apply to the NEMA tariff.[10] Currently, utilities have about 13,000 properties interconnected to the grid under a NEMA subtariff with a cumulative solar capacity of about 1,000 MW.[11] Based on data provided in the proceeding,[12] PG&E customer participation is split between residential (2,307 properties), non-residential (2,357 properties), and mixed residential and nonresidential (2,387 properties). The cumulative capacity of three property types ranges from 25.95 MW to 557.9 MW. Utilities reported that combined solar and storage installations participating in NEMA are about 181 of the 13,000 properties.
CPUC November 2023 NEMA Decision. In the December 2022 NBT decision, the CPUC declined to adopt changes to the VNEM or NEMA tariffs, instead indicating their intention to revisit those tariff designs at a later date. Nearly a year later, in November 2023, the CPUC adopted a decision concerning VNEM and NEMA.[13] For NEMA, the CPUC decision notes no obligation to continue the program, stating the authorizing statute only required NEMA as part of NEM 1.0 and the statutory NEM 1.0 cap of ~5,256 MWs had been reached.[14] Regardless, the CPUC adopted a Net Billing Tariff –Aggregation (NBT-A) program to optimize land resources, including locating solar facilities on agriculturally underperforming land. The CPUC noted this land optimization provided “additional benefits but only to the subtariff customers, not all customers.”[15] The CPUC elected not to allow for netting/self-consumption. While the decision does not go into great detail regarding netting/self-consumption for NEMA, it does express concerns about interconnection costs in relation to NEMA and found that savings from net surplus compensation do not compensate for higher utility costs caused by NEMA subtariff customers.
COMMENTS:
- Author’s Statement. According to the author, “AB 2175 amends Section 2827 of the Public Utilities Code to clarify that logistics and manufacturing businesses are eligible customer-generators under California’s Net Energy Metering (NEM) program if the California Public Utilities Commission (CPUC) elects to extend the multiple-meter load aggregation program. While current law allows certain customers to aggregate electrical load across multiple meters, eligibility has been inconsistently applied. By making this clarification, the amendment ensures fair access to clean energy programs, encourages private investment, and supports progress toward the state’s climate and energy goals. It also represents an important step toward making microgrids a more practical and widespread reality for Californians by enabling large-scale users to better generate and manage distributed energy across interconnected systems. At the same time, it preserves all existing safeguards by maintaining CPUC authority to evaluate ratepayer impacts, ensure grid reliability, and implement the program in a balanced and cost-effective manner. California leads the way on policy innovation, and this legislation is one step we can take to bring us closer to our clean and renewable energy ambitions.”
- Purpose of Bill. AB 2175 authorizes the CPUC to ensure logistics and manufacturing customers are eligible customer-generators for the NBT-A program. The goal of this bill is to ensure that logistic and manufacturing customers can make use of available land around a warehouse (for example) to deploy a net energy metering system and use that energy in adjacent land parcels. Figure 1 highlights the idea behind the NBT-A program. Renewable energy is produced in Parcel A, but the adjacent parcels, including those across the street, are considered contiguous as long as they are owned by the same customer generator. This configuration allows the energy generated in Parcel A to be shared with Parcels B-E through their individual meters. There are some additional restrictions to participation in the NBT-A program, but participation from large energy users, such as warehouses, may be a powerful incentive to encourage decarbonization from these energy users.
Figure 2: Schematic of an eligible NBT-A. Parcel A is where the energy generating facility is located, with Parcels B-E eligible to receive energy from generation on A.[16]
- Prior Legislation.
SB 1374 (Becker, 2024) required the CPUC by July 1, 2025, to update to a more generous compensation scheme for credits customers in multi-unit residential apartments or public schools receive from behind-the-meter (BTM) renewable generation facilities. Additionally, the bill required the CPUC by July 1, 2027, to update the contract or tariff established by the CPUC in 2023 to allow for account-level netting among certain meters, as determined by the CPUC. Status: Vetoed by Governor Newsom.
AB 1139 (Lorena Gonzalez) directed the CPUC to adopt a new NEM standard contract or tariff, which the bill defines as the "replacement tariff," by August 1, 2022, and requires an electrical IOU to offer the replacement tariff to an eligible customer-generator by December 31, 2023. If the CPUC fails to act, the CPUC is required to adopt a new tariff under terms prescribed by the bill. Status: Died – Assembly Inactive file.
AB 327 (Perea) instituted several rate reforms and required the CPUC to adopt a successor NEM tariff no later than December 31, 2015. Status: Chapter 611, Statutes of 2013.
SB 594 (Wolk), among its provisions, authorized NEMA to allow an eligible customer-generator to aggregate the electrical load from multiple meters, and NEM credits are shared among all properties that are attached, adjacent, or contiguous to the generation facility. Required that a customer-generator must be the sole owner, lessee, or renter of the properties in order to utilize NEMA. Status: Chapter 610, Statutes of 2012.
SB 656 (Alquist) required every electric utility, including electrical corporations which offer residential service, to develop a standard tariff providing for NEM to eligible customer-generators. Applies only to those systems that produce up to 10 kilowatts and would be restricted to 0.1 percent of a utility’s peak demand. Status: Chapter 369, Statutes of 1995.
REGISTERED SUPPORT / OPPOSITION:
Note: This bill was significantly amended on April 16th. Any position letters on file are in reference to the previous version of the bill. The committee cannot verify current positions of these organizations.
Support
350 Bay Area
350 Contra Costa Action
350 Contra Costa Action (350 Cca)
350 Humboldt
Bay Area Clean Air Coalition
Berkeley Electrification Working Group
California Alliance for Community Energy
California Interfaith Power & Light
Californians for Energy Choice
Center for Biological Diversity
Clean Coalition, the
Clean Coalition
Greenbank Associates
Ivy Energy
Monterey County Renters United
Oil & Gas Action Network
Reclaim Our Power!
San Diego 350
Solar Rights Alliance
Sunflower Alliance
Sustainable Systems Research Foundation
The Climate Center
Uniting the Central Coast for Action
Wellstone Democratic Club, Sacramento
Opposition
California State Association of Electrical Workers
Coalition of California Utility Employees
Pacific Gas and Electric Company and its Affiliated Entities
Analysis Prepared by: Alexa. Cohill-Milanick / U. & E. / (916) 319-2083
See Decision Revising Net Energy Metering and Subtariffs, CPUC, December 13, 2021, at: https://docs.cpuc.ca.gov/PublishedDocs/Efile/G000/M430/K903/430903088.PDF ↑
D. 22-12-056 ↑
See PG&E’s 2024 residential TOU at ~45¢ here: https://view.officeapps.live.com/op/view.aspx?src=https://www.pge.com/assets/rates/tariffs/Res_Inclu_TOU_Current.xlsx ↑
Values relative to SDG&E’s Energy Export Credits under the NBT; https://www.sdge.com/solar/solar-billing-plan/export-pricing ↑
Pg. 129, D. 22-12-056 ↑
CPUC, “Fact Sheet: Modernizing NEM to Meet California’s Reliability and Climate Goals;” November 10, 2022. https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/net-energy-metering-nem/nemrevisit/final-fact-sheet-nem.pdf ↑
CPUC Fact Sheet; “Modernizing California’s Net Energy Metering Program to Meet our Clean Energy Goals.” December 13, 2021. ↑
D. 23-11-068 ↑
PUC § 2827(h)(B); after cap or sunset is reached, program is subject to CPUC discretion but statute directs “there shall be no limitation on the amount of generating capacity or number of new eligible customer-generators entitled to receive service…” pursuant to PUC § 2827.1(c) ↑
Pg. 5, Reso E-4854, June 15, 2017; https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M190/K169/190169188.PDF ↑
Pg. 69, D. 23-11-068 ↑
R. 20-08-020; Table 10, pg. 82, D. 23-11-068 ↑
D. 23-11-068 ↑
Pg. 73, D. 23-11-068 ↑
Pg. 78, D. 23-11-068 ↑
Electrical Schedule NBT, Load Aggregation – NBTA, PG&E, https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_SCHEDS_NBT.pdf ↑
Bill Author