AB 2493: Electrical corporations: interconnection: Public Utilities Commission: transmission development monitor.
- Session Year: 2025-2026
- House: Assembly
- Latest Version Date: 2026-09-30
Current Status:
Passed
(2026-09-30: Chaptered by Secretary of State - Chapter 944, Statutes of 2026.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission, if it determines that the rules, practices, equipment, appliances, facilities, or service of a public utility, or the methods of manufacture, distribution, transmission, storage, or supply used by the public utility, are unjust, unreasonable, unsafe, improper, inadequate, or insufficient, to determine and fix the rules, practices, equipment, appliances, facilities, service, or methods to be observed, furnished, constructed, enforced, or employed.
This bill would, within one year following the adoption of a transmission plan by the Independent System Operator through the transmission planning process, or a successor process, or within one year following the execution of a generator interconnection agreement, except as specified, require each large electrical corporation, as defined, or transmission owner, as defined, that is assigned or obligated to construct a project that requires approval by the commission to submit to the below-described transmission development monitor a project-specific schedule for the project, as provided.
This bill would require the commission, on or before October 1, 2027, to establish a transmission development monitor within the commission. The bill would require the transmission development monitor to monitor and review certain information regarding transmission- and interconnection-related facilities submitted by the large electrical corporation or transmission owner, the large electrical corporations or transmission owners progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, the large electrical corporations or transmission owners compliance with the above-described schedule submitted to the transmission development monitor, and the large electrical corporations or transmission owners compliance with any remedial actions ordered by the commission, as specified. The bill would require the transmission development monitor, among other things, to prepare and submit an annual report, as provided, and to notify the commission within 15 days of identifying a material deficiency, as defined. The bill would require the commission, within 90 days of receiving an annual report or notification of a material deficiency, to issue a resolution directing the large electrical corporation or transmission owner to take remedial actions to address material deficiencies identified by the transmission development monitor, as specified.
Existing constitutional provisions require that a statute that limits the right of access to the meetings of public bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest protected by the limitation and the need for protecting that interest.
This bill would make legislative findings to that effect.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above-described provisions would be part of the act and a violation of a commission action implementing the above-described provisions would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission, if it determines that the rules, practices, equipment, appliances, facilities, or service of a public utility, or the methods of manufacture, distribution, transmission, storage, or supply used by the public utility, are unjust, unreasonable, unsafe, improper, inadequate, or insufficient, to determine and fix the rules, practices, equipment, appliances, facilities, service, or methods to be observed, furnished, constructed, enforced, or employed.
This bill would, within one year following the adoption of a transmission plan by the Independent System Operator through the transmission planning process, or a successor process, or within one year following the execution of a generator interconnection agreement, except as specified, require each large electrical corporation, as defined, or transmission owner, as defined, that is assigned or obligated to construct a project that requires approval by the commission to submit to the below-described transmission development monitor a project-specific schedule for the project, as provided.
This bill would require the commission, on or before October 1, 2027, to establish a transmission development monitor within the commission. The bill would require the transmission development monitor to monitor and review certain information regarding transmission- and interconnection-related facilities submitted by the large electrical corporation or transmission owner, the large electrical corporations or transmission owners progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, the large electrical corporations or transmission owners compliance with the above-described schedule submitted to the transmission development monitor, and the large electrical corporations or transmission owners compliance with any remedial actions ordered by the commission, as specified. The bill would require the transmission development monitor, among other things, to prepare and submit an annual report, as provided, and to notify the commission within 15 days of identifying a material deficiency, as defined. The bill would require the commission, within 90 days of receiving an annual report or notification of a material deficiency, to issue a resolution directing the large electrical corporation or transmission owner to take remedial actions to address material deficiencies identified by the transmission development monitor, as specified.
Existing constitutional provisions require that a statute that limits the right of access to the meetings of public bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest protected by the limitation and the need for protecting that interest.
This bill would make legislative findings to that effect.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above-described provisions would be part of the act and a violation of a commission action implementing the above-described provisions would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission, if it determines that the rules, practices, equipment, appliances, facilities, or service of a public utility, or the methods of manufacture, distribution, transmission, storage, or supply used by the public utility, are unjust, unreasonable, unsafe, improper, inadequate, or insufficient, to determine and fix the rules, practices, equipment, appliances, facilities, service, or methods to be observed, furnished, constructed, enforced, or employed.
This bill would, within 180 days one year following the adoption of a transmission plan by the Independent System Operator through the transmission planning process, or a successor process, or within 180 days one year following the execution of a generator interconnection agreement, except as specified, require each large electrical corporation, as defined, or transmission owner, as defined, that is assigned or obligated to construct a project that requires approval by the commission to submit to the below-described transmission development monitor a project-specific schedule for the project, as provided.
This bill would require the commission, on or before July October 1, 2027, to establish a transmission development monitor within the commission. The bill would require the transmission development monitor to monitor and review certain information regarding transmission- and interconnection-related facilities submitted by the large electrical corporation, corporation or transmission owner, the large electrical corporations or transmission owners progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, the large electrical corporations or transmission owners compliance with the above-described schedule submitted to the transmission development monitor, and the large electrical corporations or transmission owners compliance with any remedial actions ordered by the commission, as specified. The bill would require the transmission development monitor, among other things, to prepare and submit an annual report, as provided, and to notify the commission within 15 days of identifying a material deficiency, as defined. Within The bill would require the commission, within 90 days of receiving an annual report or notification of a material deficiency, the bill would require the commission to issue a resolution directing the large electrical corporation or transmission owner to take remedial actions to address material deficiencies identified by the transmission development monitor, as specified.
Existing constitutional provisions require that a statute that limits the right of access to the meetings of public bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest protected by the limitation and the need for protecting that interest.
This bill would make legislative findings to that effect.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above-described provisions would be part of the act and a violation of a commission action implementing the above-described provisions would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission, if it determines that the rules, practices, equipment, appliances, facilities, or service of a public utility, or the methods of manufacture, distribution, transmission, storage, or supply used by the public utility, are unjust, unreasonable, unsafe, improper, inadequate, or insufficient, to determine and fix the rules, practices, equipment, appliances, facilities, service, or methods to be observed, furnished, constructed, enforced, or employed.
This bill would, within one year 180 days following the adoption of each a transmission plan produced by the Independent System Operator through the transmission planning process, or a successor process, and or within one year 180 days following the execution of a generator interconnection agreement, require each large electrical corporation, as defined, that is assigned or obligated to construct a project that requires approval by the commission to initiate permitting for the project by filing an application or other notice, as applicable, pursuant to a specific general order of the commission. The bill would authorize a large electrical corporation to request an extension of the filing deadline by demonstrating good cause, as described, in a written notice to the commission, as provided. If a large electrical corporation fails to adhere to these timelines, or to make a timely extension request, the bill would require the commission to take appropriate enforcement action, as specified. submit to the below-described transmission development monitor a project-specific schedule for the project, as provided.
This bill would require, beginning require the commission, on or before July 1, 2027, the commission to require each large electrical corporation to retain an independent third-party auditor to establish a transmission development monitor within the commission. The bill would require the transmission development monitor to monitor and review certain information regarding transmission- and interconnection-related facilities submitted by the large electrical corporation, the large electrical corporations progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, the large electrical corporations compliance with the above-described permitting deadlines, schedule submitted to the transmission development monitor, and the large electrical corporations compliance with any remedial actions ordered by the commission, as specified. The bill would require the third-party auditor to report to the commission on an annual basis, as provided. transmission development monitor, among other things, to prepare and submit an annual report, as provided, and to notify the commission within 15 days of identifying a material deficiency, as defined. Within 90 days of receiving the auditors report, an annual report or notification of a material deficiency, the bill would require the commission to issue a resolution directing the large electrical corporation to take remedial actions to address any and all material deficiencies identified by the auditor, transmission development monitor, as specified.
Existing constitutional provisions require that a statute that limits the right of access to the meetings of public bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest protected by the limitation and the need for protecting that interest.
This bill would make legislative findings to that effect.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above-described provisions would be part of the act and a violation of a commission action implementing the above-described provisions would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission, if it determines that the rules, practices, equipment, appliances, facilities, or service of a public utility, or the methods of manufacture, distribution, transmission, storage, or supply used by the public utility, are unjust, unreasonable, unsafe, improper, inadequate, or insufficient, to determine and fix the rules, practices, equipment, appliances, facilities, service, or methods to be observed, furnished, constructed, enforced, or employed.
This bill would, within one year following the adoption of each transmission plan produced by the Independent System Operator through the transmission planning process, or a successor process, and within one year following the execution of a generator interconnection agreement, require each large electrical corporation corporation, as defined, that is assigned or obligated to construct a project that requires approval by the commission to initiate permitting for the project by filing an application or other notice, as applicable, pursuant to a specific general order. order of the commission. The bill would authorize a large electrical corporation to request an extension of the filing deadline by demonstrating good cause cause, as described, in a written notice to the commission, as provided. If a large electrical corporation fails to adhere to these timelines, or to make a timely extension request, the bill would require the commission to take appropriate enforcement action, as specified.
This bill would require, beginning January July 1, 2027, the commission to require each large electrical corporation, as defined, corporation to retain an independent third-party auditor to review certain information regarding transmission- and interconnection-related submissions made facilities submitted by the large electrical corporation, the large electrical corporations progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, the large electrical corporations compliance with the above-described permitting deadlines, and the large electrical corporations compliance with any remedial actions ordered by the commission, as specified. The bill would require the third-party auditor to report to the commission on an annual basis, as provided. Within 90 days of receiving the auditors report, the bill would require the commission to issue a resolution directing a the large electrical corporation to take remedial actions to address any and all deficiencies identified by the auditor, as specified.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above-described provisions would be part of the act and a violation of a commission action implementing the above-described provisions would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission, if it determines that the rules, practices, equipment, appliances, facilities, or service of a public utility, or the methods of manufacture, distribution, transmission, storage, or supply used by the public utility, are unjust, unreasonable, unsafe, improper, inadequate, or insufficient, to determine and fix the rules, practices, equipment, appliances, facilities, service, or methods to be observed, furnished, constructed, enforced, or employed.
This bill would, within one year following the adoption of each transmission plan produced by the Independent System Operator through the transmission planning process, or a successor process, and within one year following the execution of a generator interconnection agreement, require each large electrical corporation that is assigned or obligated to construct a project that requires approval by the commission to initiate permitting for the project by filing an application or other notice, as applicable, pursuant to a specific general order. The bill would authorize a large electrical corporation to request an extension of the filing deadline by demonstrating good cause in a written notice to the commission, as provided. If a large electrical corporation fails to adhere to these timelines, or to make a timely extension request, the bill would require the commission to take appropriate enforcement action, as specified.
This bill would require, beginning January 1, 2027, the commission to require each large electrical corporation, as defined, to retain an independent third-party auditor to review certain transmission- and interconnection-related submissions made by the large electrical corporation, the large electrical corporations progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, the large electrical corporations compliance with the above-described permitting deadlines, and the large electrical corporations compliance with any remedial actions ordered by the commission, as specified. The bill would require the third-party auditor to report to the commission on an annual basis, as provided. Within 90 days of receiving the auditors report, the bill would require the commission to issue a resolution directing a large electrical corporation to take remedial actions to address any and all deficiencies identified by the auditor, as specified.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above-described provisions would be part of the act and a violation of a commission action implementing the above-described provisions would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission, if it determines that the rules, practices, equipment, appliances, facilities, or service of a public utility, or the methods of manufacture, distribution, transmission, storage, or supply used by the public utility, are unjust, unreasonable, unsafe, improper, inadequate, or insufficient, to determine and fix the rules, practices, equipment, appliances, facilities, service, or methods to be observed, furnished, constructed, enforced, or employed.
This bill would, within one year following the adoption of each transmission plan produced by the Independent System Operator through the transmission planning process, or a successor process, and within one year following the execution of a generator interconnection agreement, require each large electrical corporation that is assigned or obligated to construct a project that requires approval by the commission to initiate permitting for the project by filing an application or other notice, as applicable, pursuant to a specific general order. The bill would authorize a large electrical corporation to request an extension of the filing deadline by demonstrating good cause in a written notice to the commission, as provided. If a large electrical corporation fails to adhere to these timelines, or to make a timely extension request, the bill would require the commission to take appropriate enforcement action, as specified.
This bill would require require, beginning January 1, 2027, the commission to require each large electrical corporation corporation, as defined, to retain an independent third-party auditor to review certain transmission- and interconnection-related submissions made by the large electrical corporation, the large electrical corporations progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, and the large electrical corporations compliance with any remedial actions ordered by the commission, as specified. The bill would require the third-party auditor to report to the commission on an annual basis, as provided. Within 90 days of receiving the auditors report, the bill would require the commission to issue a resolution directing an a large electrical corporation to take remedial actions necessary to address any and all deficiencies identified by the auditor, as specified.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above-described provisions would be part of the act and a violation of a commission action implementing the above-described provisions would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission, if it determines that the rules, practices, equipment, appliances, facilities, or service of a public utility, or the methods of manufacture, distribution, transmission, storage, or supply used by the public utility, are unjust, unreasonable, unsafe, improper, inadequate, or insufficient, to determine and fix the rules, practices, equipment, appliances, facilities, service, or methods to be observed, furnished, constructed, enforced, or employed.
This bill would require the commission to require each electrical corporation to retain an independent third-party auditor to review certain transmission- and interconnection-related submissions made by the electrical corporation, the electrical corporations progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, and the electrical corporations compliance with any remedial actions ordered by the commission, as specified. The bill would require the third-party auditor to report to the commission on an annual basis, as provided. Within 90 days of receiving the auditors report, the bill would require the commission to issue a resolution directing an electrical corporation to take remedial actions necessary to address any deficiencies identified by the auditor, as specified.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above-described provisions would be part of the act and a violation of a commission action implementing the above-described provisions would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(a)(1)Within one year following the adoption of a transmission plan by the Independent System Operator through the transmission planning process, or a successor process, each large electrical corporation or transmission owner that is assigned to construct a project that requires approval by the commission, or within one year following the execution of a generator interconnection agreement that obligates a large electrical corporation or transmission owner to construct a project that requires approval by the commission, the large electrical corporation or transmission owner shall submit to the transmission development monitor established pursuant to subdivision (b) a project-specific schedule for the project, including, at a minimum, both of the following:
(A)The anticipated date by which the large electrical corporation or transmission owner will file an application or other notice with the commission, as applicable, pursuant to General Order 131-E.
(B)The anticipated dates for completion of key interim steps toward the filing in subparagraph (A), including engineering design, environmental studies, and, if applicable, initiation of the prefiling consultation required under General Order 131-E.
(2)For a project eligible for competitive solicitation pursuant to the transmission planning process, the one-year period specified in paragraph (1) shall run from the date the Independent System Operator selects a project sponsor for the project, rather than from the date of adoption of the transmission plan.
(3)If a large electrical corporation or transmission owner determines that it will not meet a date specified in a schedule submitted pursuant to paragraph (1), the large electrical corporation or transmission owner shall promptly notify the transmission development monitor of the anticipated revision, and shall provide a revised date and a written explanation of the reason for the revision.
(4)The transmission development monitor shall track each large electrical corporations or transmission owners performance against the schedules the large electrical corporation or transmission owner submitted pursuant to paragraph (1), including the frequency, duration, and stated reasons for any revisions made pursuant to paragraph (3), and shall include this information in the annual report required pursuant to subdivision (b).
(5)(A)A pattern of repeated revisions to a schedule submitted pursuant to paragraph (1), or a substantial deviation between the schedule and the large electrical corporations or transmission owners actual performance, that the transmission development monitor determines is not attributable to factors beyond the large electrical corporations or transmission owners reasonable control, constitutes a material deficiency.
(B)In assessing a pattern of repeated revisions to a schedule or a substantial deviation between a schedule and the large electrical corporations or transmission owners actual performance, the transmission development monitor shall consider, as mitigating factors, time reasonably spent by the large electrical corporation or transmission owner awaiting or participating in environmental reviews undertaken pursuant to state or federal law, seeking applicable federal, state, or local land use permits, acquiring land or access rights, modifying a project to comply with public safety obligations or previously unidentified environmental factors, awaiting delivery of project materials or components affected by supply chain constraints, and other project-specific contingencies.
(C)If a large electrical corporation or transmission owner fails to submit a schedule required by paragraph (1), or fails to provide a notice required by paragraph (3), the commission shall take appropriate enforcement action pursuant to Section 701.
(b)(1)On or before October 1, 2027, the commission shall establish a transmission development monitor within the commission. The transmission development monitor shall, on a continuous basis, monitor and review each large electrical corporations or transmission owners submissions pursuant to commission Resolution E-5252 and subparagraph (B) of paragraph (2) of subdivision (a) of Section 399.13, progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, compliance with subdivision (a), and compliance with any remedial actions ordered by the commission pursuant to subdivision (c).
(2)The transmission development monitor shall prepare, and submit to the commission, an annual report related to the transmission development monitors actions taken pursuant to paragraph (1). The annual report shall be posted on the commissions internet website and incorporated into the commissions annual reporting requirements pursuant to subdivision (g) of Section 913.4. The transmission development monitor may engage directly with a large electrical corporation or transmission owner between annual reports to obtain current project information, identify emerging or potential delays, and assess compliance.
(3)To the extent reasonably ascertainable, an annual report submitted pursuant to paragraph (2) shall determine whether project delays are primarily attributable to a large electrical corporation or transmission owner, a generator interconnection customer, a transmission developer, the Independent System Operator, a permitting agency, or another third party. In making this determination, the transmission development monitor shall consider whether a large electrical corporations or transmission owners completion of network upgrades or other prerequisite obligations affected the timing of any milestones attributed to a generator interconnection customer, transmission developer, or other third party.
(4)In addition to the annual report required pursuant to paragraph (2), the transmission development monitor shall provide recommendations to the commission on updates to reporting requirements to provide stakeholders with project statuses, milestones, causes of delay, and potential remedial actions, and shall notify the commission within 15 days of identifying a material deficiency.
(5)In carrying out its monitoring responsibilities under this subdivision, the transmission development monitor may request information from a generator or developer with an interconnection agreement dependent on a transmission project subject to this section. A request for information pursuant to this paragraph shall not delay or otherwise interfere with an ongoing interconnection or transmission project, and shall not impose reporting obligations on a generator or developer beyond providing the specific information requested by the transmission development monitor for purposes of monitoring and review. The transmission development monitor may enter into, and may require a generator or developer providing information pursuant to this paragraph to enter into, a nondisclosure agreement to protect market-sensitive information, and may report findings based on that information in an anonymized form.
(6)(A)On or before April 1, 2027, the commission shall adopt standardized data reporting templates and accounting procedures applicable to all large electrical corporations and transmission owners for submissions reviewed pursuant to this subdivision. In developing the standardized data reporting templates, the commission shall, to the maximum extent feasible, use existing reporting platforms, data submissions, and tracking systems, including the transmission planning process, the Transmission Development Forum, and reports required pursuant to Section 913.4, to avoid imposing duplicative reporting obligations on large electrical corporations or transmission owners. All large electrical corporations and transmission owners shall use the standardized data reporting templates for all submissions made on or after the date of their adoption. The commission shall update the standardized data reporting templates as necessary to reflect changes in the commissions transmission project review process.
(B)The commission shall seek to collaborate with the Energy Commission and the Independent System Operator to develop a common reporting format that, to the extent feasible, results in standardized and comparable data across the three entities, allows a large electrical corporation or transmission owner to satisfy its reporting obligations through a single submission, and improves public and stakeholder access to transmission and interconnection project data.
(C)The standardized data reporting templates shall, at a minimum, include information regarding all of the following for each transmission and interconnection project subject to subdivision (a):
(i)The original and current permitting and construction timelines for the project, including anticipated dates for completion of key interim steps, including land acquisition, relevant permits, engineering design, environmental studies, and, if applicable, initiation of the prefiling consultation required under General Order 131-E.
(ii)Any delay, or risk of delay, and the projected duration in the delay. The templates shall specify methods for notifying the transmission development monitor of potential material impacts on project timing.
(iii)A written explanation of the cause of each delay, including whether completion of any network upgrade or other prerequisite obligation of the large electrical corporation or transmission owner affected the timing of any milestone attributed to a generator interconnection customer, transmission developer, or other third party.
(iv)The status of preconstruction dependencies, including scoping, land acquisition, permitting, engineering, design, and equipment procurement for the project.
(v)The level of staff and capital resources allocated to the project.
(vi)Any third-party contracting necessary to complete the project.
(vii)The large electrical corporations or transmission owners criteria or methodology for sequencing and prioritizing the project relative to other transmission and interconnection projects, including how the large electrical corporation or transmission owner allocates limited engineering, procurement, and construction resources among competing projects.
(viii)Any decision or financial limitation by the large electrical corporation or transmission owner, or the developer, to defer, deprioritize, or resequence the project following approval in a generator interconnection agreement or a transmission plan approved by the Independent System Operator, and the basis for that decision.
(D)Nothing in clause (vii) or (viii) of subparagraph (C) requires public disclosure of information beyond what is required under Section 583 and the commissions rules governing confidential treatment of information submitted to the commission.
(7)The monitoring and review conducted pursuant to this subdivision shall be designed to avoid unnecessary duplication with other commission oversight, reporting requirements, or ongoing proceedings.
(8)Before finalizing the annual report pursuant to paragraph (2) or providing notice of a material deficiency pursuant to paragraph (4), the transmission development monitor shall provide any affected large electrical corporation or transmission owner with a summary of any material deficiency finding and an opportunity to respond to, or seek clarification of, that finding within 15 days. The transmission development monitor shall include the large electrical corporations or transmission owners response, if any, in the annual report or notice submitted to the commission. The large electrical corporations or transmission owners exercise of the opportunity to respond under this paragraph shall not extend the 90-day period specified in subdivision (c).
(9)The commission may, by resolution and after notice and opportunity for public comment, modify the scope, objectives, or reporting requirements of the transmission development monitors review under this subdivision as necessary to address changes in the risks to the timely and cost-effective completion of transmission and interconnection projects.
(c)(1)Within 90 days of receiving an annual report or notice of a material deficiency from the transmission development monitor pursuant to subdivision (b), the commission shall issue a resolution directing the large electrical corporation or transmission owner to take remedial actions to address material deficiencies identified by the transmission development monitor that the transmission development monitor determines are within the large electrical corporations or transmission owners reasonable control. Remedial actions may include, but are not limited to, any of the following:
(A)Reallocating staff or capital resources to complete high-priority
upgrades. For purposes of this subparagraph, high-priority upgrades means any of the following:
(i)Transmission, distribution, or interconnection facilities affecting the interconnection or deliverability of at least 100 megawatts of generating or storage capacity.
(ii)Projects that are needed for system or local reliability.
(iii)Projects that are needed to meet state policy objectives.
(iv)Upgrades that have experienced significant cost overruns and delays that could impact ratepayers.
(B)Facilitating advanced procurement of equipment or equipment sharing with other electrical corporations, local publicly owned electric utilities, interconnection customers, or other entities to address delays caused by supply chain constraints.
(C)Enabling generators to procure equipment on behalf of the large electrical corporation or transmission owner, while ensuring the equipment meets necessary specifications for safety, performance, and reliability.
(D)Enabling self-build options by generators or transmission solutions developed by another electrical corporation.
For purposes of this subparagraph, self-build options includes, but is not limited to, the permitting, design, procurement, construction, or commissioning of transmission, distribution, or interconnection facilities by an entity other than the large electrical corporation or transmission owner.
(E)Expediting engineering, design, permitting, and other preconstruction work for high-priority upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator.
(2)Any equipment procurement, construction, or self-build option undertaken pursuant to this subdivision shall be subject to the large electrical corporations or transmission owners design, engineering, operational, safety, cybersecurity, and reliability standards, including applicable North American Electric Reliability Corporation requirements. The large electrical corporation or transmission owner shall retain final authority to approve all designs, equipment specifications, construction practices, and commissioning associated with the equipment procurement, construction, or self-build option, and shall complete any review within 30 days of submission by an entity other than the large electrical corporation or transmission owner.
(3)Any remedial action ordered, or enforcement action taken, by the commission pursuant to this section shall be consistent with, and shall not exceed, the commissions jurisdiction and authority under federal law, including the Federal Power Act (16 U.S.C. Sec. 791a et seq.).
(d)For transmission or interconnection projects experiencing delays that the transmission development monitor determines are beyond the reasonable control of the large electrical corporation or transmission owner, the transmission development monitor may refer the project to the Governors Office of Business and Economic Development, including through the Tracking Energy Development Task Force, for interagency coordination and escalation.
(e)A large electrical corporations or transmission owners record of compliance with remedial actions ordered by the commission pursuant to this section shall be admissible evidence and considered by the commission in any decision approving a rate or cost of capital application filed pursuant to Section 451.
(f)Compliance with a remedial action ordered by the commission pursuant to subdivision (c) shall not create a presumption that any cost incurred in complying with that remedial action is reasonable or recoverable in rates under Section 451.
(g)For purposes of this section, all of the following definitions apply:
(1)Large electrical corporation has the same meaning as defined in Section 3280.(2)Material deficiency means a deficiency that is reasonably likely to result in a significant delay in the completion of a network upgrade or interconnection facility, or that reflects a pattern of repeated noncompliance with subdivision (a).(3)Milestone means a scheduled date or deliverable for which a generator interconnection customer, transmission developer, or other third party is responsible under an interconnection agreement, a transmission facilities agreement, or another applicable project development schedule.(4)Transmission owner means an entity, other than a large electrical corporation, that owns, controls, or is assigned or obligated to construct transmission facilities subject to the jurisdiction of the Federal Energy Regulatory Commission and is assigned or obligated to construct a transmission or interconnection project that requires a certificate of public convenience and necessity pursuant to Section 1001 or a permit to construct pursuant to General Order 131-E.
SEC. 2.The Legislature finds and declares that Section 1 of this act, which adds Section 769.4 to the Public Utilities Code, imposes a limitation on the publics right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article I of the California Constitution. Pursuant to that constitutional provision, the Legislature makes the following findings to demonstrate the interest protected by this limitation and the need for protecting that interest:
In order to protect the confidential and market-sensitive information of an entity subject to Section 1 of this act, it is necessary that this act limit the publics right of access to that information.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)Within one year following the adoption of a transmission plan by the Independent System Operator through the transmission planning process, or a successor process, each large electrical corporation or transmission owner that is assigned to construct a project that requires approval by the commission, or within one year following the execution of a generator interconnection agreement that obligates a large electrical corporation or transmission owner to construct a project that requires approval by the commission, the large electrical corporation or transmission owner shall submit to the transmission development monitor established pursuant to subdivision (b) a project-specific schedule for the project, including, at a minimum, both of the following:
(A)The anticipated date by which the large electrical corporation or transmission owner will file an application or other notice with the commission, as applicable, pursuant to General Order 131-E.
(B)The anticipated dates for completion of key interim steps toward the filing in subparagraph (A), including engineering design, environmental studies, and, if applicable, initiation of the prefiling consultation required under General Order 131-E.
(2)For a project eligible for competitive solicitation pursuant to the transmission planning process, the one-year period specified in paragraph (1) shall run from the date the Independent System Operator selects a project sponsor for the project, rather than from the date of adoption of the transmission plan.
(3)If a large electrical corporation or transmission owner determines that it will not meet a date specified in a schedule submitted pursuant to paragraph (1), the large electrical corporation or transmission owner shall promptly notify the transmission development monitor of the anticipated revision, and shall provide a revised date and a written explanation of the reason for the revision.
(4)The transmission development monitor shall track each large electrical corporations or transmission owners performance against the schedules the large electrical corporation or transmission owner submitted pursuant to paragraph (1), including the frequency, duration, and stated reasons for any revisions made pursuant to paragraph (3), and shall include this information in the annual report required pursuant to subdivision (b).
(5)(A)A pattern of repeated revisions to a schedule submitted pursuant to paragraph (1), or a substantial deviation between the schedule and the large electrical corporations or transmission owners actual performance, that the transmission development monitor determines is not attributable to factors beyond the large electrical corporations or transmission owners reasonable control, constitutes a material deficiency.
(B)In assessing a pattern of repeated revisions to a schedule or a substantial deviation between a schedule and the large electrical corporations or transmission owners actual performance, the transmission development monitor shall consider, as mitigating factors, time reasonably spent by the large electrical corporation or transmission owner awaiting or participating in environmental reviews undertaken pursuant to state or federal law, seeking applicable federal, state, or local land use permits, acquiring land or access rights, modifying a project to comply with public safety obligations or previously unidentified environmental factors, awaiting delivery of project materials or components affected by supply chain constraints, and other project-specific contingencies.
(C)If a large electrical corporation or transmission owner fails to submit a schedule required by paragraph (1), or fails to provide a notice required by paragraph (3), the commission shall take appropriate enforcement action pursuant to Section 701.
(b)(1)On or before October 1, 2027, the commission shall establish a transmission development monitor within the commission. The transmission development monitor shall, on a continuous basis, monitor and review each large electrical corporations or transmission owners submissions pursuant to commission Resolution E-5252 and subparagraph (B) of paragraph (2) of subdivision (a) of Section 399.13, progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, compliance with subdivision (a), and compliance with any remedial actions ordered by the commission pursuant to subdivision (c).
(2)The transmission development monitor shall prepare, and submit to the commission, an annual report related to the transmission development monitors actions taken pursuant to paragraph (1). The annual report shall be posted on the commissions internet website and incorporated into the commissions annual reporting requirements pursuant to subdivision (g) of Section 913.4. The transmission development monitor may engage directly with a large electrical corporation or transmission owner between annual reports to obtain current project information, identify emerging or potential delays, and assess compliance.
(3)To the extent reasonably ascertainable, an annual report submitted pursuant to paragraph (2) shall determine whether project delays are primarily attributable to a large electrical corporation or transmission owner, a generator interconnection customer, a transmission developer, the Independent System Operator, a permitting agency, or another third party. In making this determination, the transmission development monitor shall consider whether a large electrical corporations or transmission owners completion of network upgrades or other prerequisite obligations affected the timing of any milestones attributed to a generator interconnection customer, transmission developer, or other third party.
(4)In addition to the annual report required pursuant to paragraph (2), the transmission development monitor shall provide recommendations to the commission on updates to reporting requirements to provide stakeholders with project statuses, milestones, causes of delay, and potential remedial actions, and shall notify the commission within 15 days of identifying a material deficiency.
(5)In carrying out its monitoring responsibilities under this subdivision, the transmission development monitor may request information from a generator or developer with an interconnection agreement dependent on a transmission project subject to this section. A request for information pursuant to this paragraph shall not delay or otherwise interfere with an ongoing interconnection or transmission project, and shall not impose reporting obligations on a generator or developer beyond providing the specific information requested by the transmission development monitor for purposes of monitoring and review. The transmission development monitor may enter into, and may require a generator or developer providing information pursuant to this paragraph to enter into, a nondisclosure agreement to protect market-sensitive information, and may report findings based on that information in an anonymized form.
(6)(A)On or before April 1, 2027, the commission shall adopt standardized data reporting templates and accounting procedures applicable to all large electrical corporations and transmission owners for submissions reviewed pursuant to this subdivision. In developing the standardized data reporting templates, the commission shall, to the maximum extent feasible, use existing reporting platforms, data submissions, and tracking systems, including the transmission planning process, the Transmission Development Forum, and reports required pursuant to Section 913.4, to avoid imposing duplicative reporting obligations on large electrical corporations or transmission owners. All large electrical corporations and transmission owners shall use the standardized data reporting templates for all submissions made on or after the date of their adoption. The commission shall update the standardized data reporting templates as necessary to reflect changes in the commissions transmission project review process.
(B)The commission shall seek to collaborate with the Energy Commission and the Independent System Operator to develop a common reporting format that, to the extent feasible, results in standardized and comparable data across the three entities, allows a large electrical corporation or transmission owner to satisfy its reporting obligations through a single submission, and improves public and stakeholder access to transmission and interconnection project data.
(C)The standardized data reporting templates shall, at a minimum, include information regarding all of the following for each transmission and interconnection project subject to subdivision (a):
(i)The original and current permitting and construction timelines for the project, including anticipated dates for completion of key interim steps, including land acquisition, relevant permits, engineering design, environmental studies, and, if applicable, initiation of the prefiling consultation required under General Order 131-E.
(ii)Any delay, or risk of delay, and the projected duration in the delay. The templates shall specify methods for notifying the transmission development monitor of potential material impacts on project timing.
(iii)A written explanation of the cause of each delay, including whether completion of any network upgrade or other prerequisite obligation of the large electrical corporation or transmission owner affected the timing of any milestone attributed to a generator interconnection customer, transmission developer, or other third party.
(iv)The status of preconstruction dependencies, including scoping, land acquisition, permitting, engineering, design, and equipment procurement for the project.
(v)The level of staff and capital resources allocated to the project.
(vi)Any third-party contracting necessary to complete the project.
(vii)The large electrical corporations or transmission owners criteria or methodology for sequencing and prioritizing the project relative to other transmission and interconnection projects, including how the large electrical corporation or transmission owner allocates limited engineering, procurement, and construction resources among competing projects.
(viii)Any decision or financial limitation by the large electrical corporation or transmission owner, or the developer, to defer, deprioritize, or resequence the project following approval in a generator interconnection agreement or a transmission plan approved by the Independent System Operator, and the basis for that decision.
(D)Nothing in clause (vii) or (viii) of subparagraph (C) requires public disclosure of information beyond what is required under Section 583 and the commissions rules governing confidential treatment of information submitted to the commission.
(7)The monitoring and review conducted pursuant to this subdivision shall be designed to avoid unnecessary duplication with other commission oversight, reporting requirements, or ongoing proceedings.
(8)Before finalizing the annual report pursuant to paragraph (2) or providing notice of a material deficiency pursuant to paragraph (4), the transmission development monitor shall provide any affected large electrical corporation or transmission owner with a summary of any material deficiency finding and an opportunity to respond to, or seek clarification of, that finding within 15 days. The transmission development monitor shall include the large electrical corporations or transmission owners response, if any, in the annual report or notice submitted to the commission. The large electrical corporations or transmission owners exercise of the opportunity to respond under this paragraph shall not extend the 90-day period specified in subdivision (c).
(9)The commission may, by resolution and after notice and opportunity for public comment, modify the scope, objectives, or reporting requirements of the transmission development monitors review under this subdivision as necessary to address changes in the risks to the timely and cost-effective completion of transmission and interconnection projects.
(c)(1)Within 90 days of receiving an annual report or notice of a material deficiency from the transmission development monitor pursuant to subdivision (b), the commission shall issue a resolution directing the large electrical corporation or transmission owner to take remedial actions to address material deficiencies identified by the transmission development monitor that the transmission development monitor determines are within the large electrical corporations or transmission owners reasonable control. Remedial actions may include, but are not limited to, any of the following:
(A)Reallocating staff or capital resources to complete high-priority
upgrades. For purposes of this subparagraph, high-priority upgrades means any of the following:
(i)Transmission, distribution, or interconnection facilities affecting the interconnection or deliverability of at least 100 megawatts of generating or storage capacity.
(ii)Projects that are needed for system or local reliability.
(iii)Projects that are needed to meet state policy objectives.
(iv)Upgrades that have experienced significant cost overruns and delays that could impact ratepayers.
(B)Facilitating advanced procurement of equipment or equipment sharing with other electrical corporations, local publicly owned electric utilities, interconnection customers, or other entities to address delays caused by supply chain constraints.
(C)Enabling generators to procure equipment on behalf of the large electrical corporation or transmission owner, while ensuring the equipment meets necessary specifications for safety, performance, and reliability.
(D)Enabling self-build options by generators or transmission solutions developed by another electrical corporation.
For purposes of this subparagraph, self-build options includes, but is not limited to, the permitting, design, procurement, construction, or commissioning of transmission, distribution, or interconnection facilities by an entity other than the large electrical corporation or transmission owner.
(E)Expediting engineering, design, permitting, and other preconstruction work for high-priority upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator.
(2)Any equipment procurement, construction, or self-build option undertaken pursuant to this subdivision shall be subject to the large electrical corporations or transmission owners design, engineering, operational, safety, cybersecurity, and reliability standards, including applicable North American Electric Reliability Corporation requirements. The large electrical corporation or transmission owner shall retain final authority to approve all designs, equipment specifications, construction practices, and commissioning associated with the equipment procurement, construction, or self-build option, and shall complete any review within 30 days of submission by an entity other than the large electrical corporation or transmission owner.
(3)Any remedial action ordered, or enforcement action taken, by the commission pursuant to this section shall be consistent with, and shall not exceed, the commissions jurisdiction and authority under federal law, including the Federal Power Act (16 U.S.C. Sec. 791a et seq.).
(d)For transmission or interconnection projects experiencing delays that the transmission development monitor determines are beyond the reasonable control of the large electrical corporation or transmission owner, the transmission development monitor may refer the project to the Governors Office of Business and Economic Development, including through the Tracking Energy Development Task Force, for interagency coordination and escalation.
(e)A large electrical corporations or transmission owners record of compliance with remedial actions ordered by the commission pursuant to this section shall be admissible evidence and considered by the commission in any decision approving a rate or cost of capital application filed pursuant to Section 451.
(f)Compliance with a remedial action ordered by the commission pursuant to subdivision (c) shall not create a presumption that any cost incurred in complying with that remedial action is reasonable or recoverable in rates under Section 451.
(g)For purposes of this section, all of the following definitions apply:
(1)Large electrical corporation has the same meaning as defined in Section 3280.(2)Material deficiency means a deficiency that is reasonably likely to result in a significant delay in the completion of a network upgrade or interconnection facility, or that reflects a pattern of repeated noncompliance with subdivision (a).(3)Milestone means a scheduled date or deliverable for which a generator interconnection customer, transmission developer, or other third party is responsible under an interconnection agreement, a transmission facilities agreement, or another applicable project development schedule.(4)Transmission owner means an entity, other than a large electrical corporation, that owns, controls, or is assigned or obligated to construct transmission facilities subject to the jurisdiction of the Federal Energy Regulatory Commission and is assigned or obligated to construct a transmission or interconnection project that requires a certificate of public convenience and necessity pursuant to Section 1001 or a permit to construct pursuant to General Order 131-E.
SEC. 2.The Legislature finds and declares that Section 1 of this act, which adds Section 769.4 to the Public Utilities Code, imposes a limitation on the publics right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article I of the California Constitution. Pursuant to that constitutional provision, the Legislature makes the following findings to demonstrate the interest protected by this limitation and the need for protecting that interest:
In order to protect the confidential and market-sensitive information of an entity subject to Section 1 of this act, it is necessary that this act limit the publics right of access to that information.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)Within 180 days one year following the adoption of a transmission plan by the Independent System Operator through the transmission planning process, or a successor process, that assigns a each large electrical corporation or transmission owner that is assigned to construct a project that requires approval by the commission, or within 180 days one year following the execution of a generator interconnection agreement that obligates a large electrical corporation or transmission owner to construct a project that requires approval by the commission, the large electrical corporation or transmission owner shall submit to the transmission development monitor established pursuant to subdivision (b) a project-specific schedule for the project, including, at a minimum, both of the following:
(A)The anticipated date by which the large electrical corporation or transmission owner will file an application or other notice with the commission, as applicable, pursuant to General Order 131-E.
(B)The anticipated dates for completion of key interim steps toward the filing in subparagraph (A), including engineering design, environmental studies, and, if applicable, initiation of the prefiling consultation required under General Order 131-E.
(2)For a project eligible for competitive solicitation pursuant to the transmission planning process, the one-year period specified in paragraph (1) shall run from the date the Independent System Operator selects a project sponsor for the project, rather than from the date of adoption of the transmission plan.
(2)(3)If a large electrical corporation or transmission owner determines that it will not meet a date specified in a schedule submitted pursuant to paragraph (1), the large electrical corporation or transmission owner shall promptly notify the transmission development monitor of the anticipated revision, and shall provide a revised date and a written explanation of the reason for the revision.
(3)(4)The transmission development monitor shall track each large electrical corporations or transmission owners performance against the schedules the large electrical corporation or transmission owner submitted pursuant to paragraph (1), including the frequency, duration, and stated reasons for any revisions made pursuant to paragraph (2), (3), and shall include this information in the annual report required pursuant to subdivision (b).
(4)(5)(A)A pattern of repeated revisions to a schedule submitted pursuant to paragraph (1), or a substantial deviation between the schedule and the large electrical corporations or transmission owners actual performance, that the transmission development monitor determines is not attributable to factors beyond the large electrical corporations or transmission owners reasonable control, constitutes a material deficiency.
(B)In assessing a pattern of repeated revisions to a schedule or a substantial deviation between a schedule and the large electrical corporations or transmission owners actual performance, the transmission development monitor shall consider, as mitigating factors, time reasonably spent by the large electrical corporation or transmission owner awaiting or participating in environmental reviews undertaken pursuant to state or federal law, seeking applicable federal, state, or local land use permits, acquiring land or access rights, modifying a project to comply with public safety obligations or previously unidentified environmental factors, awaiting delivery of project materials or components affected by supply chain constraints, and other project-specific contingencies.
(C)If a large electrical corporation or transmission owner fails to submit a schedule required by paragraph (1), or fails to provide a notice required by paragraph (2), (3), the commission shall take appropriate enforcement action pursuant to Section 701.
(b)(1)On or before July October 1, 2027, the commission shall establish a transmission development monitor within the commission. The transmission development monitor shall, on a continuous basis, monitor and review each large electrical corporations or transmission owners submissions pursuant to commission Resolution E-5252 and subparagraph (B) of paragraph (2) of subdivision (a) of Section 399.13, progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, compliance with subdivision (a), and compliance with any remedial actions ordered by the commission pursuant to subdivision (c).
(2)The transmission development monitor shall prepare, and submit to the commission, an annual report related to the transmission development monitors actions taken pursuant to paragraph (1). The annual report shall be posted on the commissions internet website and incorporated into the commissions annual reporting requirements pursuant to subdivision (g) of Section 913.4. The transmission development monitor may engage directly with a large electrical corporation or transmission owner between annual reports to obtain current project information, identify emerging or potential delays, and assess compliance.
(3)To the extent reasonably ascertainable, an annual report submitted pursuant to paragraph (2) shall determine whether project delays are primarily attributable to a large electrical corporation, corporation or transmission owner, a generator interconnection customer, a transmission developer, the Independent System Operator, a permitting agency, or another third party. In making this determination, the transmission development monitor shall consider whether a large electrical corporations or transmission owners completion of network upgrades or other prerequisite obligations affected the timing of any milestones attributed to a generator interconnection customer, transmission developer, or other third party.
(4)In addition to the annual report required pursuant to paragraph (2), the transmission development monitor shall provide recommendations to the commission on updates to reporting requirements to provide stakeholders with project statuses, milestones, causes of delay, and potential remedial actions, and shall notify the commission within 15 days of identifying a material deficiency.
(5)In carrying out its monitoring responsibilities under this subdivision, the transmission development monitor may request information from a generator or developer with an interconnection agreement dependent on a transmission project subject to this section. A request for information pursuant to this paragraph shall not delay or otherwise interfere with an ongoing interconnection or transmission project, and shall not impose reporting obligations on a generator or developer beyond providing the specific information requested by the transmission development monitor for purposes of monitoring and review. The transmission development monitor may enter into, and may require a generator or developer providing information pursuant to this paragraph to enter into, a nondisclosure agreement to protect market-sensitive information, and may report findings based on that information in an anonymized form.
(6)(A)On or before April 1, 2027, the commission shall adopt standardized data reporting templates and accounting procedures applicable to all large electrical corporations and transmission owners for submissions reviewed pursuant to this subdivision. In developing the standardized data reporting templates, the commission shall, to the maximum extent feasible, use existing reporting platforms, data submissions, and tracking systems, including the transmission planning process, the Transmission Development Forum, and reports required pursuant to Section 913.4, to avoid imposing duplicative reporting obligations on large electrical corporations. corporations or transmission owners. All large electrical corporations and transmission owners shall use the standardized data reporting templates for all submissions made on or after the date of their adoption. The commission shall update the standardized data reporting templates as necessary to reflect changes in the commissions transmission project review process.
(B)The commission shall seek to collaborate with the Energy Commission and the Independent System Operator to develop a common reporting format that, to the extent feasible, results in standardized and comparable data across the three entities, allows a large electrical corporation or transmission owner to satisfy its reporting obligations through a single submission, and improves public and stakeholder access to transmission and interconnection project data.
(C)The standardized data reporting templates shall, at a minimum, include information regarding all of the following for each transmission and interconnection project subject to subdivision (a):
(i)The original and current permitting and construction timelines for the project, including anticipated dates for completion of key interim steps, including land acquisition, relevant permits, engineering design, environmental studies, and, if applicable, initiation of the prefiling consultation required under General Order 131-E.
(ii)Any delay, or risk of delay, and the projected duration in the delay. The templates shall specify methods for notifying the transmission development monitor of potential material impacts on project timing.
(iii)A written explanation of the cause of each delay, including whether completion of any network upgrade or other prerequisite obligation of the large electrical corporation or transmission owner affected the timing of any milestone attributed to a generator interconnection customer, transmission developer, or other third party.
(iv)The status of preconstruction dependencies, including scoping, land acquisition, permitting, engineering, design, and equipment procurement for the project.
(v)The level of staff and capital resources allocated to the project.
(vi)Any third-party contracting necessary to complete the project.
(vii)The large electrical corporations or transmission owners criteria or methodology for sequencing and prioritizing the project relative to other transmission and interconnection projects, including how the large electrical corporation or transmission owner allocates limited engineering, procurement, and construction resources among competing projects.
(viii)Any decision or financial limitation by the large electrical corporation or transmission owner, or developer the developer, to defer, deprioritize, or resequence the project following approval in a generator interconnection agreement or a transmission plan approved by the Independent System Operator, and the basis for that decision.
(D)Nothing in clause (vii) or (viii) of subparagraph (C) requires public disclosure of information beyond what is required under Section 583 and the commissions rules governing confidential treatment of information submitted to the commission.
(7)The monitoring and review conducted pursuant to this subdivision shall be designed to avoid unnecessary duplication with other commission oversight, reporting requirements, or ongoing proceedings.
(8)Before finalizing the annual report pursuant to paragraph (2) or providing notice of a material deficiency pursuant to paragraph (4), the transmission development monitor shall provide any affected large electrical corporation or transmission owner with a summary of any material deficiency finding and an opportunity to respond to, or seek clarification of, that finding within 15 days. The transmission development monitor shall include the large electrical corporations or transmission owners response, if any, in the annual report or notice submitted to the commission. The large electrical corporations or transmission owners exercise of the opportunity to respond under this paragraph shall not extend the 90-day period specified in subdivision (c).
(9)The commission may, by resolution and after notice and opportunity for public comment, modify the scope, objectives, or reporting requirements of the transmission development monitors review under this subdivision as necessary to address changes in the risks to the timely and cost-effective completion of transmission and interconnection projects.
(c)(1)Within 90 days of receiving an annual report or notice of a material deficiency from the transmission development monitor pursuant to subdivision (b), the commission shall issue a resolution directing the large electrical corporation or transmission owner to take remedial actions to address material deficiencies identified by the transmission development monitor that the transmission development monitor determines are within the large electrical corporations or transmission owners reasonable control. Remedial actions may include, but are not limited to, any of the following:
(1)(A)(A)Reallocating staff or capital resources to complete high-priority upgrades.
(B)Forupgrades. For purposes of this paragraph, subparagraph, high-priority upgrades means transmission, distribution, or interconnection facilities affecting the interconnection or deliverability of at least 100 megawatts of generating or storage capacity. any of the following:
(i)Transmission, distribution, or interconnection facilities affecting the interconnection or deliverability of at least 100 megawatts of generating or storage capacity.
(ii)Projects that are needed for system or local reliability.
(iii)Projects that are needed to meet state policy objectives.
(iv)Upgrades that have experienced significant cost overruns and delays that could impact ratepayers.
(2)(B)Facilitating advanced procurement of equipment or equipment sharing with other electrical corporations, local publicly owned electric utilities, interconnection customers, or other entities to address delays caused by supply chain constraints.
(3)Interim deliverability or temporary generator interconnection solutions.(4)(C)Enabling generators to procure equipment on behalf of the large electrical corporation, corporation or transmission owner, while ensuring the equipment meets necessary specifications for safety, performance, and reliability.
(5)(A)(D)Enabling self-build options by generators or transmission solutions developed by another electrical corporation.
(B)ForFor purposes of this paragraph, subparagraph, self-build options includes, but is not limited to, the permitting, design, procurement, construction, or commissioning of transmission, distribution, or interconnection facilities by an entity other than the large electrical corporation. corporation or transmission owner.
(6)(E)Expediting engineering, design, permitting, and other preconstruction work for high-priority upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator.
(7)(2)Any equipment procurement, construction, or self-build option undertaken pursuant to this subdivision shall be subject to the large electrical corporations or transmission owners design, engineering, operational, safety, cybersecurity, and reliability standards, including applicable North American Electric Reliability Corporation requirements. The large electrical corporation or transmission owner shall retain final authority to approve all designs, equipment specifications, construction practices, and commissioning associated with the equipment procurement, construction, or self-build option, and shall complete any review within 30 days of submission by an entity other than the large electrical corporation. corporation or transmission owner.
(8)(3)Any remedial action ordered ordered, or enforcement action taken, by the commission pursuant to this subdivision section shall be consistent with, and shall not exceed, the commissions jurisdiction and authority under federal law, including the Federal Power Act (16 U.S.C. Sec. 791a et seq.).
(d)For transmission or interconnection projects experiencing delays that the transmission development monitor determines are beyond the reasonable control of the large electrical corporation, corporation or transmission owner, the transmission development monitor may refer the project to the Governors Office of Business and Economic Development, including through the Tracking Energy Development Task Force, for interagency coordination and escalation.
(e)A large electrical corporations or transmission owners record of compliance with remedial actions ordered by the commission pursuant to this section shall be admissible evidence and considered by the commission in any decision approving a rate or cost of capital application filed pursuant to Section 451.
(f)Compliance with a remedial action ordered by the commission pursuant to subdivision (c) shall not create a presumption that any cost incurred in complying with that remedial action is reasonable or recoverable in rates under Section 451.
(f)(g)For purposes of this section, all of the following definitions apply:
(1)Large electrical corporation has the same meaning as defined in Section 3280.(2)Material deficiency means a deficiency that is reasonably likely to result in a significant delay in the completion of a network upgrade or interconnection facility, or that reflects a pattern of repeated noncompliance with subdivision (a).(3)Milestone means a scheduled date or deliverable for which a generator interconnection customer, transmission developer, or other third party is responsible under an interconnection agreement, a transmission facilities agreement, or another applicable project development schedule.(4)Transmission owner means an entity, other than a large electrical corporation, that owns, controls, or is assigned or obligated to construct transmission facilities subject to the jurisdiction of the Federal Energy Regulatory Commission and is assigned or obligated to construct a transmission or interconnection project that requires a certificate of public convenience and necessity pursuant to Section 1001 or a permit to construct pursuant to General Order 131-E.
SEC. 2.The Legislature finds and declares that Section 1 of this act, which adds Section 769.4 to the Public Utilities Code, imposes a limitation on the publics right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article I of the California Constitution. Pursuant to that constitutional provision, the Legislature makes the following findings to demonstrate the interest protected by this limitation and the need for protecting that interest:
In order to protect the confidential and market-sensitive information of an entity subject to Section 1 of this act, it is necessary that this act limit the publics right of access to that information.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)(A)Within one year 180 days following the adoption of each a transmission plan produced by the Independent System Operator through the transmission planning process, or a successor process, each large electrical corporation that is assigned that assigns a large electrical corporation to construct a project that requires approval by the commission shall initiate permitting for the project by filing an application or other notice, as applicable, pursuant to General Order 131-E. commission, or within 180 days following the execution of a generator interconnection agreement that obligates a large electrical corporation to construct a project that requires approval by the commission, the large electrical corporation shall submit to the transmission development monitor established pursuant to subdivision (b) a project-specific schedule for the project, including, at a minimum, both of the following:
(B)Within one year following the execution of a generator interconnection agreement, each large electrical corporation that is obligated to construct a project that requires approval by the commission shall initiate permitting for the project by filing an application or other notice, as applicable, pursuant to General Order 131-E. (2)(A)A large electrical corporation may request an extension of the filing deadlines described in paragraph (1) by demonstrating good cause in a written notice to the commission. The notice shall be served at least 30 days before the filing deadline and specify the actions the large electrical corporation is undertaking to resolve the principal causes of delay identified in the notice.(B)For purposes of this paragraph, good cause may include preparatory conditions, including engineering completion, environmental assessments, and necessary coordination with affected stakeholders, and factors that the auditor determines are beyond the reasonable control of the large electrical corporation, including, but not limited to, supply chain constraints and permitting delays at federal, state, or local agencies.(3)If a large electrical corporation fails to adhere to the timelines specified in this section, or to make a timely extension request pursuant to paragraph (2), the commission shall take appropriate enforcement action pursuant to Section 701.(A)The anticipated date by which the large electrical corporation will file an application or other notice with the commission, as applicable, pursuant to General Order 131-E.
(B)The anticipated dates for completion of key interim steps toward the filing in subparagraph (A), including engineering design, environmental studies, and, if applicable, initiation of the prefiling consultation required under General Order 131-E.
(2)If a large electrical corporation determines that it will not meet a date specified in a schedule submitted pursuant to paragraph (1), the large electrical corporation shall promptly notify the transmission development monitor of the anticipated revision, and shall provide a revised date and a written explanation of the reason for the revision.
(3)The transmission development monitor shall track each large electrical corporations performance against the schedules the large electrical corporation submitted pursuant to paragraph (1), including the frequency, duration, and stated reasons for any revisions made pursuant to paragraph (2), and shall include this information in the annual report required pursuant to subdivision (b).
(4)(A)A pattern of repeated revisions to a schedule submitted pursuant to paragraph (1), or a substantial deviation between the schedule and the large electrical corporations actual performance, that the transmission development monitor determines is not attributable to factors beyond the large electrical corporations reasonable control, constitutes a material deficiency.
(B)In assessing a pattern of repeated revisions to a schedule or a substantial deviation between a schedule and the large electrical corporations actual performance, the transmission development monitor shall consider, as mitigating factors, time reasonably spent by the large electrical corporation awaiting or participating in environmental reviews undertaken pursuant to state or federal law, seeking applicable federal, state, or local land use permits, acquiring land or access rights, modifying a project to comply with public safety obligations or previously unidentified environmental factors, awaiting delivery of project materials or components affected by supply chain constraints, and other project-specific contingencies.
(C)If a large electrical corporation fails to submit a schedule required by paragraph (1), or fails to provide a notice required by paragraph (2), the commission shall take appropriate enforcement action pursuant to Section 701.
(b)(1)Beginning On or before July 1, 2027, the commission shall require each large electrical corporation to retain an independent third-party auditor selected and approved by the commission to establish a transmission development monitor within the commission. The transmission development monitor shall, on a continuous basis, monitor and review the each large electrical corporations submissions pursuant to commission Resolution E-5252 and subparagraph (B) of paragraph (2) of subdivision (a) of Section 399.13, the large electrical corporations progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, the large electrical corporations compliance with subdivision (a), and the large electrical corporations compliance with any remedial actions ordered by the commission pursuant to subdivision (c).
(2)The commission, in consultation with the Public Advocates Office of the Public Utilities Commission, shall select the auditor and shall ensure that the auditor does not have a conflict of interest due to other work, contracts, or business relationships with the large electrical corporation.(3)(2)The auditor transmission development monitor shall report to the commission on an annual basis. The reports of the auditor prepare, and submit to the commission, an annual report related to the transmission development monitors actions taken pursuant to paragraph (1). The annual report shall be posted on the commissions internet website and incorporated into the commissions annual reporting requirements pursuant to subdivision (g) of Section 913.4. The transmission development monitor may engage directly with a large electrical corporation between annual reports to obtain current project information, identify emerging or potential delays, and assess compliance.
(3)To the extent reasonably ascertainable, an annual report submitted pursuant to paragraph (2) shall determine whether project delays are primarily attributable to a large electrical corporation, a generator interconnection customer, a transmission developer, the Independent System Operator, a permitting agency, or another third party. In making this determination, the transmission development monitor shall consider whether a large electrical corporations completion of network upgrades or other prerequisite obligations affected the timing of any milestones attributed to a generator interconnection customer, transmission developer, or other third party.
(4)In addition to the annual report required pursuant to paragraph (2), the transmission development monitor shall provide recommendations to the commission on updates to reporting requirements to provide stakeholders with project statuses, milestones, causes of delay, and potential remedial actions, and shall notify the commission within 15 days of identifying a material deficiency.
(5)In carrying out its monitoring responsibilities under this subdivision, the transmission development monitor may request information from a generator or developer with an interconnection agreement dependent on a transmission project subject to this section. A request for information pursuant to this paragraph shall not delay or otherwise interfere with an ongoing interconnection or transmission project, and shall not impose reporting obligations on a generator or developer beyond providing the specific information requested by the transmission development monitor for purposes of monitoring and review. The transmission development monitor may enter into, and may require a generator or developer providing information pursuant to this paragraph to enter into, a nondisclosure agreement to protect market-sensitive information, and may report findings based on that information in an anonymized form.
(6)(A)On or before April 1, 2027, the commission shall adopt standardized data reporting templates and accounting procedures applicable to all large electrical corporations for submissions reviewed pursuant to this subdivision. In developing the standardized data reporting templates, the commission shall, to the maximum extent feasible, use existing reporting platforms, data submissions, and tracking systems, including the transmission planning process, the Transmission Development Forum, and reports required pursuant to Section 913.4, to avoid imposing duplicative reporting obligations on large electrical corporations. All large electrical corporations shall use the standardized data reporting templates for all submissions made on or after the date of their adoption. The commission shall update the standardized data reporting templates as necessary to reflect changes in the commissions transmission project review process.
(B)The commission shall seek to collaborate with the Energy Commission and the Independent System Operator to develop a common reporting format that, to the extent feasible, results in standardized and comparable data across the three entities, allows a large electrical corporation to satisfy its reporting obligations through a single submission, and improves public and stakeholder access to transmission and interconnection project data.
(C)The standardized data reporting templates shall, at a minimum, include information regarding all of the following for each transmission and interconnection project subject to subdivision (a):
(i)The original and current permitting and construction timelines for the project, including anticipated dates for completion of key interim steps, including land acquisition, relevant permits, engineering design, environmental studies, and, if applicable, initiation of the prefiling consultation required under General Order 131-E.
(ii)Any delay, or risk of delay, and the projected duration in the delay. The templates shall specify methods for notifying the transmission development monitor of potential material impacts on project timing.
(iii)A written explanation of the cause of each delay, including whether completion of any network upgrade or other prerequisite obligation of the large electrical corporation affected the timing of any milestone attributed to a generator interconnection customer, transmission developer, or other third party.
(iv)The status of preconstruction dependencies, including scoping, land acquisition, permitting, engineering, design, and equipment procurement for the project.
(v)The level of staff and capital resources allocated to the project.
(vi)Any third-party contracting necessary to complete the project.
(vii)The large electrical corporations criteria or methodology for sequencing and prioritizing the project relative to other transmission and interconnection projects, including how the large electrical corporation allocates limited engineering, procurement, and construction resources among competing projects.
(viii)Any decision or financial limitation by the large electrical corporation or developer to defer, deprioritize, or resequence the project following approval in a generator interconnection agreement or a transmission plan approved by the Independent System Operator, and the basis for that decision.
(D)Nothing in clause (vii) or (viii) of subparagraph (C) requires public disclosure of information beyond what is required under Section 583 and the commissions rules governing confidential treatment of information submitted to the commission.
(7)The monitoring and review conducted pursuant to this subdivision shall be designed to avoid unnecessary duplication with other commission oversight, reporting requirements, or ongoing proceedings.
(8)Before finalizing the annual report pursuant to paragraph (2) or providing notice of a material deficiency pursuant to paragraph (4), the transmission development monitor shall provide any affected large electrical corporation with a summary of any material deficiency finding and an opportunity to respond to, or seek clarification of, that finding within 15 days. The transmission development monitor shall include the large electrical corporations response, if any, in the annual report or notice submitted to the commission. The large electrical corporations exercise of the opportunity to respond under this paragraph shall not extend the 90-day period specified in subdivision (c).
(c)Within 90 days of receiving the auditors report an annual report or notice of a material deficiency from the transmission development monitor pursuant to subdivision (b), the commission shall issue a resolution directing the large electrical corporation to take remedial actions to address any and all material deficiencies identified by the auditor. transmission development monitor that the transmission development monitor determines are within the large electrical corporations reasonable control. Remedial actions may include, but are not limited to, any of the following:
(1)(A)Reallocating staff or capital resources to complete high-priority upgrades.
(B)For purposes of this paragraph, high-priority upgrades means transmission, distribution, or interconnection facilities affecting the interconnection or deliverability of at least 100 megawatts of generating or storage capacity.
(2)Facilitating advanced procurement of equipment or equipment sharing with other electrical corporations corporations, local publicly owned electric utilities, interconnection customers, or other entities to address delays caused by supply chain constraints.
(3)Interim deliverability or temporary generator interconnection solutions.
(4)Enabling generators to procure equipment on behalf of the large electrical corporation, while ensuring the equipment meets necessary specifications for safety, performance, and reliability.
(5)(A)Enabling self-build options by generators or transmission solutions developed by another electrical corporation.
(B)For purposes of this paragraph, self-build options includes, but is not limited to, the permitting, design, procurement, construction, or commissioning of transmission, distribution, or interconnection facilities by an entity other than the large electrical corporation.
(6)Expediting engineering, design, permitting, and other preconstruction work for high-priority upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator.
(7)Any equipment procurement, construction, or self-build option undertaken pursuant to this subdivision shall be subject to the large electrical corporations design, engineering, operational, safety, cybersecurity, and reliability standards, including applicable North American Electric Reliability Corporation requirements. The large electrical corporation shall retain final authority to approve all designs, equipment specifications, construction practices, and commissioning associated with the equipment procurement, construction, or self-build option, and shall complete any review within 30 days of submission by an entity other than the large electrical corporation.
(8)Any remedial action ordered by the commission pursuant to this subdivision shall be consistent with, and shall not exceed, the commissions jurisdiction and authority under federal law, including the Federal Power Act (16 U.S.C. Sec. 791a et seq.).
(d)For transmission or interconnection projects experiencing delays that the transmission development monitor determines are beyond the reasonable control of the large electrical corporation, the transmission development monitor may refer the project to the Governors Office of Business and Economic Development, including through the Tracking Energy Development Task Force, for interagency coordination and escalation.
(d)The(e)A large electrical corporations record of compliance with remedial actions ordered by the commission pursuant to this section shall be admissible evidence and considered by the commission in any decision approving a rate or cost of capital application filed pursuant to Section 451.
(e)This section does not authorize an electrical corporation to seek, or the commission to approve, an increase in a revenue requirement or cost of capital under Section 451 based on compliance with any remedial actions ordered under this section.(f)For purposes of this section, large all of the following definitions apply:(1)Large electrical corporation has the same meaning as defined in Section 3280.
(2)Material deficiency means a deficiency that is reasonably likely to result in a significant delay in the completion of a network upgrade or interconnection facility, or that reflects a pattern of repeated noncompliance with subdivision (a).
(3)Milestone means a scheduled date or deliverable for which a generator interconnection customer, transmission developer, or other third party is responsible under an interconnection agreement, a transmission facilities agreement, or another applicable project development schedule.
SEC. 2.The Legislature finds and declares that Section 1 of this act, which adds Section 769.4 to the Public Utilities Code, imposes a limitation on the publics right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article I of the California Constitution. Pursuant to that constitutional provision, the Legislature makes the following findings to demonstrate the interest protected by this limitation and the need for protecting that interest:
In order to protect the confidential and market-sensitive information of an entity subject to Section 1 of this act, it is necessary that this act limit the publics right of access to that information.
SEC. 2.SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)(A)Within one year following the adoption of each transmission plan produced by the Independent System Operator through the transmission planning process, or a successor process, each large electrical corporation that is assigned to construct a project that requires approval by the commission shall initiate permitting for the project by filing an application or other notice, as applicable, pursuant to General Order 131-E.
(B)Within one year following the execution of a generator interconnection agreement, each large electrical corporation that is obligated to construct a project that requires approval by the commission shall initiate permitting for the project by filing an application or other notice, as applicable, pursuant to General Order 131-E.
(2)(A)A large electrical corporation may request an extension of the filing deadlines described in paragraph (1) by demonstrating good cause in a written notice to the commission. The notice shall be served at least 30 days before the filing deadline and specify the actions the large electrical corporation is undertaking to resolve the principal causes of delay identified in the notice.
(B)For purposes of this paragraph, good cause may include preparatory conditions, including engineering completion, environmental assessments, and necessary coordination with affected stakeholders, and factors that the auditor determines are beyond the reasonable control of the large electrical corporation, including, but not limited to, supply chain constraints and permitting delays at federal, state, or local agencies.
(3)If a large electrical corporation fails to adhere to the timelines specified in this section, or to make a timely extension request pursuant to paragraph (2), the commission shall take appropriate enforcement action pursuant to Section 701.
(b)(1)Beginning January July 1, 2027, the commission shall require each large electrical corporation to retain an independent third-party auditor selected and approved by the commission to review the large electrical corporations submissions pursuant to commission Resolution E-5252 and subdivision (g) of Section 913.4, subparagraph (B) of paragraph (2) of subdivision (a) of Section 399.13, the large electrical corporations progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, the large electrical corporations compliance with subdivision (a), and the large electrical corporations compliance with any remedial actions ordered by the commission pursuant to subdivision (c).
(1)(2)The commission, in consultation with the Public Advocates Office of the Public Utilities Commission, shall select the auditor and shall ensure that the auditor does not have a conflict of interest due to other work, contracts, or business relationships with the large electrical corporation.
(2)(3)The auditor shall report to the commission on an annual basis. The reports of the auditor shall be posted on the commissions internet website and incorporated into the commissions annual reporting requirements pursuant to subdivision (g) of Section 913.4.
(c)Within 90 days of receiving the auditors report pursuant to subdivision (b), the commission shall issue a resolution directing a the large electrical corporation to take remedial actions to address any and all deficiencies identified by the auditor. Remedial actions may include, but are not limited to, the following:
(1)(A)Reallocating staff or capital resources to complete high-priority upgrades.
(B)For purposes of this paragraph, high-priority upgrades means transmission, distribution, or interconnection facilities affecting the interconnection or deliverability of at least 100 megawatts of generating or storage capacity.
(2)Facilitating advanced procurement of equipment or equipment sharing with other electrical corporations to address delays caused by supply chain constraints.
(3)Interim deliverability or temporary generator interconnection solutions.
(4)Enabling generators to procure equipment on behalf of the large electrical corporation, while ensuring the equipment meets necessary specifications for safety, performance, and reliability.
(5)(A)Enabling self-build options by generators or transmission solutions developed by another electrical corporation.
(B)For purposes of this paragraph, self-build options includes, but is not limited to, the permitting, design, procurement, construction, or commissioning of transmission, distribution, or interconnection facilities by an entity other than the large electrical corporation.
(6)Expediting engineering, design, permitting, and other preconstruction work for high-priority upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator.
(d)The large electrical corporations record of compliance with remedial actions ordered by the commission pursuant to this section shall be admissible evidence and considered by the commission in any decision approving a rate or cost of capital application filed pursuant to Section 451.
(e)This section does not authorize an electrical corporation to seek, or the commission to approve, an increase in a revenue requirement or cost of capital under Section 451 based on compliance with any remedial actions ordered under this section.
(f)For purposes of this section, large electrical corporation has the same meaning as defined in Section 3280.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)(A)Within one year following the adoption of each transmission plan produced by the Independent System Operator through the transmission planning process, or a successor process, each large electrical corporation that is assigned to construct a project that requires approval by the commission shall initiate permitting for the project by filing an application or other notice, as applicable, pursuant to General Order 131-E.
(B)Within one year following the execution of a generator interconnection agreement, each large electrical corporation that is obligated to construct a project that requires approval by the commission shall initiate permitting for the project by filing an application or other notice, as applicable, pursuant to General Order 131-E.
(2)A large electrical corporation may request an extension of the filing deadlines described in paragraph (1) by demonstrating good cause in a written notice to the commission. The notice shall be served at least 30 days before the filing deadline and specify the actions the large electrical corporation is undertaking to resolve the principal causes of delay identified in the notice.
(3)If a large electrical corporation fails to adhere to the timelines specified in this section, or to make a timely extension request pursuant to paragraph (2), the commission shall take appropriate enforcement action pursuant to Section 701.
(b)Beginning January 1, 2027, the commission shall require each large electrical corporation to retain an independent third-party auditor selected and approved by the commission to review the large electrical corporations submissions pursuant to commission Resolution E-5252 and subdivision (g) of Section 913.4, the large electrical corporations progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, the large electrical corporations compliance with subdivision (a), and the large electrical corporations compliance with any remedial actions ordered by the commission pursuant to subdivision (c).
(1)The commission shall consult commission, in consultation with the Public Advocates Office of the Public Utilities Commission on the selection of Commission, shall select the auditor and shall ensure that the auditor does not have a conflict of interest due to other work, contracts, or business relationships with the large electrical corporation.
(2)The auditor shall report to the commission on an annual basis. The reports of the auditor shall be posted on the commissions internet website and incorporated into the commissions annual reporting requirements pursuant to subdivision (g) of Section 913.4.
(c)Within 90 days of receiving the auditors report pursuant to subdivision (b), the commission shall issue a resolution directing a large electrical corporation to take remedial actions to address any and all deficiencies identified by the auditor. Remedial actions may include, but are not limited to, the following:
(1)(A)Reallocating staff or capital resources to complete high-priority upgrades.
(B)For purposes of this paragraph, high-priority upgrades means transmission, distribution, or interconnection facilities affecting the interconnection or deliverability of at least 100 megawatts of generating or storage capacity.
(2)Facilitating advanced procurement of equipment or equipment sharing with other electrical corporations to address delays caused by supply chain constraints.
(3)Interim deliverability or temporary generator interconnection solutions.
(4)Enabling generators to procure equipment on behalf of the large electrical corporation. corporation, while ensuring the equipment meets necessary specifications for safety, performance, and reliability.
(5)(A)Enabling self-build options by generators or transmission solutions developed by another electrical corporation.
(B)For purposes of this paragraph, self-build options includes, but is not limited to, the permitting, design, procurement, construction, or commissioning of transmission, distribution, or interconnection facilities by an entity other than the large electrical corporation.
(6)Expediting engineering, design, permitting, and other preconstruction work for high-priority upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator.
(d)The large electrical corporations record of compliance with remedial actions ordered by the commission pursuant to this section shall be admissible evidence and considered by the commission in any decision approving a rate or cost of capital application filed pursuant to Section 451.
(e)This section does not authorize an electrical corporation to seek, or the commission to approve, an increase in a revenue requirement or cost of capital under Section 451 based on compliance with any remedial actions ordered under this section.
(e)(f)For purposes of this section, large electrical corporation has the same meaning as defined in Section 3280.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The (1)(A)Within one year following the adoption of each transmission plan produced by the Independent System Operator through the transmission planning process, or a successor process, each large electrical corporation that is assigned to construct a project that requires approval by the commission shall initiate permitting for the project by filing an application or other notice, as applicable, pursuant to General Order 131-E.
(B)Within one year following the execution of a generator interconnection agreement, each large electrical corporation that is obligated to construct a project that requires approval by the commission shall initiate permitting for the project by filing an application or other notice, as applicable, pursuant to General Order 131-E.
(2)A large electrical corporation may request an extension of the filing deadlines described in paragraph (1) by demonstrating good cause in a written notice to the commission. The notice shall be served at least 30 days before the filing deadline and specify the actions the large electrical corporation is undertaking to resolve the principal causes of delay identified in the notice.
(3)If a large electrical corporation fails to adhere to the timelines specified in this section, or to make a timely extension request pursuant to paragraph (2), the commission shall take appropriate enforcement action pursuant to Section 701.
(b)Beginning January 1, 2027, the commission shall require each large electrical corporation to retain an independent third-party auditor approved by the commission to review the large electrical corporations submissions pursuant to commission Resolution E-5252 and subdivision (g) of Section 913.4, the large electrical corporations progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, and the large electrical corporations compliance with any remedial actions ordered by the commission pursuant to subdivision (b). (c).
(1)The commission shall consult with the Public Advocates Office of the Public Utilities Commission on the selection of the auditor and shall ensure that the auditor does not have a conflict of interest due to other work, contracts, or business relationships with the large electrical corporation.
(2)The auditor shall report to the commission on an annual basis. The reports of the auditor shall be posted on the commissions internet website and incorporated into the commissions annual reporting requirements pursuant to subdivision (g) of Section 913.4.
(b)(c)Within 90 days of receiving the auditors report pursuant to subdivision (a), (b), the commission shall issue a resolution directing an a large electrical corporation to take remedial actions necessary to address any and all deficiencies identified by the auditor. Remedial actions may include, but are not limited to, the following:
(1)(A)Reallocating staff or capital resources to complete high-priority upgrades.
(B)For purposes of this paragraph, high-priority upgrades mean means transmission, distribution, or interconnection facilities affecting the interconnection or deliverability of at least 100 megawatts of generating or storage capacity.
(2)Facilitating advanced procurement of equipment or equipment sharing with other electrical corporations to address delays caused by supply chain constraints.
(3)Interim deliverability or temporary generator interconnection solutions.
(4)Enabling generators to procure equipment on behalf of the large electrical corporation.
(5)(A)Enabling self-build options by generators or transmission solutions developed by another electrical corporation.
(B)For purposes of this paragraph, self-build options include, includes, but are is not limited to, the permitting, design, procurement, construction, or commissioning of transmission, distribution, or interconnection facilities by an entity other than the large electrical corporation.
(6)Expediting engineering, design, permitting, and other preconstruction work for high-priority upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator.
(c)(d)The large electrical corporations record of compliance with remedial actions ordered by the commission pursuant to this section shall be admissible evidence and considered by the commission in any decision approving a rate or cost of capital application filed pursuant to Section 451.
(e)For purposes of this section, large electrical corporation has the same meaning as defined in Section 3280.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The commission shall require each electrical corporation to retain an independent third-party auditor approved by the commission to review the electrical corporations submissions pursuant to commission Resolution E-5252 and subdivision (g) of Section 913.4, the electrical corporations progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, and the electrical corporations compliance with any remedial actions ordered by the commission pursuant to subdivision (b).
(1)The commission shall consult with the Public Advocates Office of the Public Utilities Commission on the selection of the auditor and shall ensure that the auditor does not have a conflict of interest due to other work, contracts, or business relationships with the electrical corporation.
(2)The auditor shall report to the commission on an annual basis. The reports of the auditor shall be posted on the commissions internet website and incorporated into the commissions annual reporting requirements pursuant to subdivision (g) of Section 913.4.
(b)Within 90 days of receiving the auditors report pursuant to subdivision (a), the commission shall issue a resolution directing an electrical corporation to take remedial actions necessary to address any deficiencies identified by the auditor. Remedial actions may include, but are not limited to, the following:
(1)(A)Reallocating staff or capital resources to complete high-priority upgrades.
(B)For purposes of this paragraph, high-priority upgrades mean transmission, distribution, or interconnection facilities affecting the interconnection or deliverability of at least 100 megawatts of generating capacity.
(2)Facilitating advanced procurement of equipment or equipment sharing with other electrical corporations to address delays caused by supply chain constraints.
(3)Interim deliverability or temporary generator interconnection solutions.
(4)Enabling generators to procure equipment on behalf of the electrical corporation.
(5)(A)Enabling self-build options by generators or transmission solutions developed by another electrical corporation.
(B)For purposes of this paragraph, self-build options include, but are not limited to, the permitting, design, procurement, construction, or commissioning of transmission, distribution, or interconnection facilities by an entity other than the electrical corporation.
(6)Expediting engineering, design, permitting, and other preconstruction work for high-priority upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator.
(c)The electrical corporations record of compliance with remedial actions ordered by the commission pursuant to this section shall be admissible evidence and considered by the commission in any decision approving a rate or cost of capital application filed pursuant to Section 451.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Sep 30, 2026 | Chaptered by Secretary of State - Chapter 944, Statutes of 2026. |
| Sep 30, 2026 | Approved by the Governor. |
| Sep 15, 2026 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 31, 2026 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 60. Noes 16. Page 7009.). |
| Aug 31, 2026 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 60. Noes 16.). |
| Aug 31, 2026 | Senate amendments concurred in. To Engrossing and Enrolling. |
| Aug 31, 2026 | In Assembly. Concurrence in Senate amendments pending. |
| Aug 31, 2026 | Read third time. Passed. Ordered to the Assembly. (Ayes 29. Noes 10.). |
| Aug 30, 2026 | Read second time. Ordered to third reading. |
| Aug 28, 2026 | Read third time and amended. Ordered to second reading. |
| Aug 26, 2026 | Reconsideration granted. (Ayes 40. Noes 0. Page 5870.) |
| Aug 26, 2026 | Read third time. Passed. Ordered to the Assembly. (Ayes 30. Noes 9. Page 5870.). |
| Aug 26, 2026 | Reconsideration granted. (Ayes 39. Noes 0.) |
| Aug 26, 2026 | Read third time. Passed. Ordered to the Assembly. (Ayes 29. Noes 9.). |
| Aug 17, 2026 | Read second time. Ordered to third reading. |
| Aug 13, 2026 | Read second time and amended. Ordered returned to second reading. |
| Aug 13, 2026 | From committee: Amend, and do pass as amended. (Ayes 5. Noes 2.) (August 13). |
| Aug 3, 2026 | In committee: Referred to APPR. suspense file. |
| Jul 2, 2026 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 1, 2026 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 13. Noes 4.) (June 30). |
| Jun 22, 2026 | In committee: Set, first hearing. Hearing canceled at the request of author. |
| Jun 10, 2026 | Referred to Com. on E., U & C. |
| May 27, 2026 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 26, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 57. Noes 17. Page 5326.) |
| May 26, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 57. Noes 17.) |
| May 26, 2026 | Read third time. Passed. Ordered to the Senate. |
| May 18, 2026 | Read second time. Ordered to third reading. |
| May 14, 2026 | From committee: Do pass. (Ayes 11. Noes 3.) (May 14). |
| May 6, 2026 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| Apr 14, 2026 | Re-referred to Com. on APPR. |
| Apr 13, 2026 | Read second time and amended. |
| Apr 9, 2026 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 14. Noes 1.) (April 8). |
| Apr 6, 2026 | Re-referred to Com. on U. & E. |
| Mar 26, 2026 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Mar 9, 2026 | Referred to Com. on U. & E. |
| Feb 21, 2026 | From printer. May be heard in committee March 23. |
| Feb 20, 2026 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 31, 2026 | AB 2493 Petrie-Norris Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Aug 31, 2026 | Assembly 3rd Reading AB2493 Petrie-Norris By Stern | Senate Floor |
Passed |
|
| Aug 26, 2026 | Assembly 3rd Reading AB2493 Petrie-Norris By Stern Motion to Reconsider Reconsider | Senate Floor |
Passed |
|
| Aug 26, 2026 | Assembly 3rd Reading AB2493 Petrie-Norris By Stern | Senate Floor |
Passed |
|
| Aug 13, 2026 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| Aug 3, 2026 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jun 30, 2026 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
|
| May 26, 2026 | AB 2493 Petrie-Norris Assembly Third Reading | Assembly Floor |
Passed |
|
| May 14, 2026 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 8, 2026 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Energy |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Advanced Energy United | ** Support | |
| American Clean Power- California | ** Support | |
| American Clean Power- California (Co-source) | ** Support | |
| American Clean Power- California (Co-Sponsor) | ** Support | |
| California Energy Storage Alliance | ** Support | |
| California Environmental Voters | ** Support | |
| California Wind Energy Association | ** Support | |
| Ceres | ** Support | |
| City Of Berkley | ** Support | |
| City of Pico Rivera | ** Support | |
| City Of San Diego | ** Support | |
| County Of San Diego | ** Support | |
| EDF Power Solutions | ** Support | |
| Engie North America | ** Support | |
| Environmental Defense Fund | ** Support | |
| Fluence | ** Support | |
| Fluence Energy Systems | ** Support | |
| Independent Energy Producers Association | ** Support | |
| Large-Scale Solar Association | ** Support | |
| Natural Resources Defense Council | ** Support | |
| Natural Resources Defense Council (NRDC) | ** Support | |
| Ormat | ** Support | |
| pg&e | ** Against | |
| San Diego Community Power | ** Support | |
| San Diego Gas and Electric Company | ** Against | |
| Sierra Club California | ** Support | |
| Solar Energy Industries Association | ** Support | |
| Southern California Edison | ** Against | |
| Union Of Concerned Scientists | ** Support | |
| Union of Concerned Scientists (Co-source) | ** Support |
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 2493
Author:(Petrie-Norris)
As Amended Ver:August 28, 2026
Majority vote
SUMMARY
Requires the California Public Utilities Commission (CPUC) to establish a transmission development monitor to track transmission and interconnection project progress and delays, and to direct remedial actions to address material deficiencies within a large electrical corporation's or a transmission owner's reasonable control.
Senate Amendments
- Requires the CPUC, by October 1, 2027, instead of July 1, 2027, to establish a transmission development monitor to continuously monitor and review transmission and interconnection project progress, instead of requiring each large electrical corporation to retain an independent third-party auditor.
- Extends the deadline from 180 days to one year for a large electrical corporation or transmission owner to submit a project-specific schedule to the transmission development monitor following the adoption of a California Independent System operator (CAISO) transmission plan or the execution of a generator interconnection agreement that assigns the entity to construct a project requiring CPUC approval.
- Specify that, for a project eligible for competitive solicitation through the CAISO transmission planning process, the one-year period begins on the date CAISO selects a project sponsor, rather than the date the transmission plan is adopted.
- Expands the bill's requirements to apply to transmission owners and defines "transmission owner" for purposes of the bill.
- Authorizes the CPUC, by resolution and after notice and an opportunity for public comment, to modify the scope, objectives, or reporting requirements of the transmission development monitor's review as necessary to address changes in the risks to the timely and cost-effective completion of transmission and interconnection projects.
- Expands the definition of a "high-priority upgrade" to also include projects needed for system or local reliability, projects needed to meet state policy objectives, and upgrades that have experienced significant cost overruns and delays that could impact ratepayers.
- Requires that compliance with a remedial action ordered by the CPUC does not create a presumption that any cost incurred in complying with that remedial action is reasonable or recoverable in rates pursuant to PUC section 451.
- Requires the CPUC, within 90 days of receiving an annual report or notice of a material deficiency from the transmission development monitor, to issue a resolution directing the large electrical corporation or transmission owner to take remedial actions to address material deficiencies identified by the monitor that are within the corporation's or transmission owner's reasonable control.
- Makes other technical and conforming changes.
COMMENTS
Delays in Transmission and Interconnection. California continues to add significant amounts of clean energy generation and storage, but many projects depend on transmission and interconnection upgrades before they can come online. Recent CPUC and CAISO findings indicate that these projects continue to experience delays beyond their original in-service dates. In response to growing interconnection backlogs, CAISO has adopted reforms intended to prioritize commercially viable projects. However, these reforms generally do not address delays that occur after studies are completed, including utility permitting and construction of required transmission upgrades.
Transmission Planning and Permitting. CAISO's annual Transmission Planning Process (TPP) identifies transmission projects needed to maintain grid reliability, support state policy goals, reduce congestion, and integrate new resources. Once identified, utilities may need CPUC approval and environmental review before constructing new transmission facilities. Recent CPUC findings indicate that utilities can take several years between project approval and initiating the CPUC permitting process. To address these delays, AB 2493 would require large electrical corporations and transmission owners to submit project-specific schedules within one year following specified CAISO transmission plan approvals or generator interconnection agreements. These schedules would identify anticipated permitting dates and key interim steps. Large electrical corporations and transmission owners would also be required to report schedule changes and explain the reasons for those changes.
Transmission Development Monitor. In addition, the bill would require the CPUC, by October 1, 2027, to establish a transmission development monitor within the commission. The monitor would track project schedules, network upgrades, delays, and compliance with CPUC requirements and remedial actions. It would also report annually on project progress and, where reasonably ascertainable, identify whether delays are attributable to a large electrical corporation or transmission owner, a generator interconnection customer, a transmission developer, CAISO, a permitting agency, or another third party. The CPUC could also modify the scope, objectives, or reporting requirements of the monitor's review, by resolution and after notice and an opportunity for public comment, as necessary to address changes in risks to the timely and cost-effective completion of transmission and interconnection projects.
Reporting and Accountability. This measure would also require standardized reporting on project timelines, delays, preconstruction activities, resources, contracting, and project prioritization. If the transmission development monitor identifies a material deficiency within a large electrical corporation's or transmission owner's reasonable control, the CPUC would be required to direct the large electrical corporation or transmission owner to take remedial action. For delays beyond the large electrical corporation's or transmission owner's reasonable control, the monitor could instead refer the project to GO-Biz for interagency coordination.
According to the Author
According to the author, "Federal clean energy tax credits worth billions of dollars to California ratepayers are on the verge of expiring, and the single greatest obstacle to capturing those savings is the failure of our largest utilities to complete the grid upgrades needed to connect new clean energy projects. The CPUC's own data shows that nearly two-thirds of these transmission upgrades are delayed, with some languishing for over a decade. AB 2493 creates the independent oversight and enforceable accountability mechanisms needed to break through these delays before it is too late."
Arguments in Support
AB 2493 is supported by clean energy trade associations, environmental organizations, and clean energy developers who contend that delays in transmission and interconnection upgrades are slowing the development of new clean energy resources and increasing electricity system costs. Supporters further argue that the bill would improve oversight and accountability related to transmission upgrade delays, help bring new clean energy resources online more quickly, support electric reliability, and help reduce upward pressure on electricity rates.
Arguments in Opposition
This measure is opposed by PG&E, which, among other reasons, argues that AB 2493 duplicates existing federal and CAISO oversight and adds unnecessary reporting requirements. PG&E also raises concerns that project schedules can change for reasons outside a utility's control and that this bill gives the CPUC broad remedial authority that could affect how utilities prioritize personnel and resources.
FISCAL COMMENTS
According to the Senate Committee on Appropriations, this bill would result in ongoing costs, potentially in the high hundreds of thousands of dollars annually from ratepayer funds, for the CPUC to establish a transmission development monitor and implement the bill's other requirements.
VOTES:
ASM UTILITIES AND ENERGY: 14-1-3
YES: Petrie-Norris, Boerner, Calderon, Davies, Mark González, Harabedian, Hart, Irwin, Kalra, Papan, Rogers, Schiavo, Schultz, Zbur
NO: Ta
ABS, ABST OR NV: Patterson, Chen, Wallis
ASM APPROPRIATIONS: 11-3-1
YES: Wicks, Aguiar-Curry, Calderon, Caloza, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache
NO: Dixon, Ta, Tangipa
ABS, ABST OR NV: Hoover
ASSEMBLY FLOOR: 57-17-6
YES: Addis, Aguiar-Curry, Ahrens, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Connolly, Davies, Elhawary, Fong, Gabriel, Garcia, Gipson, Mark González, Haney, Harabedian, Hart, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Nguyen, Ortega, Pacheco, Papan, Patel, Pellerin, Petrie-Norris, Quirk-Silva, Ransom, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ward, Wicks, Wilson, Zbur, Rivas
NO: Chen, DeMaio, Dixon, Ellis, Gallagher, Jeff Gonzalez, Hadwick, Hoover, Johnson, Macedo, Patterson, Ramos, Sanchez, Ta, Tangipa, Valencia, Wallis
ABS, ABST OR NV: Alanis, Castillo, Flora, Lackey, Muratsuchi, Celeste Rodriguez
SENATE FLOOR: 30-9-1
YES: Allen, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Cortese, Durazo, Gonzalez, Grayson, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Padilla, Pérez, Reyes, Richardson, Rubio, Smallwood-Cuevas, Stern, Umberg, Wahab, Weber Pierson, Wiener
NO: Alvarado-Gil, Choi, Dahle, Grove, Jones, Niello, Ochoa Bogh, Seyarto, Strickland
ABS, ABST OR NV: Valladares
SENATE FLOOR: 40-0-0
YES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
UPDATED
VERSION: August 28, 2026
CONSULTANT: Lina V. Malova / U. & E. / (916) 319-2083 FN: 0004492
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | AB 2493 |
THIRD READING
Bill No: AB 2493
Author: Petrie-Norris (D)
Amended: 8/28/26 in Senate
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 13-4, 6/30/26
AYES: Allen, Archuleta, Arreguín, Ashby, Becker, Caballero, Gonzalez, Hurtado, McNerney, Reyes, Richardson, Stern, Wahab
NOES: Ochoa Bogh, Dahle, Grove, Strickland
SENATE APPROPRIATIONS COMMITTEE: 5-2, 8/13/26
AYES: Cervantes, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto, Dahle
ASSEMBLY FLOOR: 57-17, 5/26/26 - See last page for vote
SUBJECT: Electrical corporations: interconnection: Public Utilities Commission: transmission development monitor.
SOURCE: American Clean Power-California
Union of Concerned Scientists
DIGEST:
This bill requires the California Public Utilities Commission (CPUC) to require specific actions to help accelerate interconnection of generating resources to electrical transmission facilities.
Senate floor amendments of 8/28/26 address requests from the Governor’s Office.
ANALYSIS:
Existing law:
- Establishes the Federal Energy Regulatory Commission (FERC) has exclusive jurisdiction over the transmission of electricity in interstate commerce and over all facilities for the transmission or sale of electricity in interstate commerce. (Federal Power Act §§§201, 205, 206 (Title 16 United States Code (USC) 824, 824d, 824e))
- Establishes and vests the CPUC with regulatory authority over public utilities, including electrical corporations. (Article 12 of the California Constitution)
- Establishes the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) and requires the CEC to assess trends in energy consumption and analyze the social, economic, and environmental consequences of trends. (Public Resources Code §25200 et seq.)
- Establishes the California Independent System Operator (CAISO) as a nonprofit public benefit corporation and requires it to ensure efficient use and reliable operation of the electrical transmission grid. (Public Utilities Code §345)
- Requires, under the California Global Warming Solutions Act of 2006, the California Air Resources Board (CARB) to adopt a statewide greenhouse gas (GHG) emissions limit. Authorized CARB to include market-based compliance mechanisms to comply with the regulations. (Health and Safety Code §38500 et seq.)
- Requires every electrical corporation that owns electrical transmission facilities to annually prepare, as part of the FERC Order 890 process, and submit to the CPUC, a report identifying any electrical transmission facility, upgrade, or enhancement that is reasonably necessary to achieve the Renewables Portfolio Standard (RPS) procurement requirements. Requires each electrical corporation that owns electrical transmission facilities to annually prepare, and submit to the CPUC, a report on any changes to previously reported in-service dates of transmission and interconnection facilities necessary to provide transmission deliverability to eligible renewable energy resources or energy storage resources that have executed interconnection agreements. (Public Utilities Code §399.13)
- Authorizes the CPUC to supervise and regulate every public utility in the state and may do all things which are necessary and convenient in the exercise of such power and jurisdiction. (Public Utilities Code §701)
- Requires the CPUC to report to the Legislature by November 1 of each year specified information in order to evaluate the progress of the state’s electrical corporations in complying with the California RPS Program (Article 16 (commencing with Section 399.11) of Chapter 2.3). This includes a systemwide assessment of delays to interconnection or transmission approvals for eligible renewable energy resources or energy storage resources, based on the annual reports submitted to the CPUC by electrical corporations pursuant to Public Utilities Code §399.13. (Public Utilities Code §913.4)
This bill:
- Defines “large electrical corporation” as defined in Public Utilities Code §3280.
- Defines “transmission owner” as an entity, other than a large electrical corporation, that owns, controls, or is assigned or obligated to construct transmission facilities subject to the jurisdiction of the FERC and is assigned or obligated to construct a transmission or interconnection project that requires a certificate of public convenience and necessity (CPCN) or permit to construct.
- Requires each large electrical corporation and transmission owner, within one year following the adoption of a transmission plan by the CAISO through the transmission planning process (TPP), or a successor process, or within one year following the execution of a generator interconnection agreement, that is assigned or obligated to construct a project that requires approval by the CPUC to submit to the transmission development monitor at the CPUC a project specific schedule for the project, as provided. Provides that one-year period begins after the CAISO selects a project sponsor for competitive solicitation projects.
- Requires the CPUC, on or before October 1, 2027, to establish a transmission development monitor within the CPUC.
- Requires the transmission development monitor to monitor and review certain transmission- and interconnection-related facilities submitted by the large electrical corporation and transmission owners, the large electrical corporation’s and transmission owner’s progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the CAISO, the large electrical corporation’s and transmission owner’s compliance with the schedule submitted to the transmission development monitor, and the large electrical corporation’s and transmission owner’s compliance with any remedial actions ordered by the CPUC, as specified.
- Requires the transmission development monitor to report to the CPUC on an annual basis, as provided, and notify the CPUC within 15 days of identifying a material deficiency, as defined.
- Requires the CPUC, within 90 days of receiving an annual report or notification of material deficiency to issue a resolution directing the large electrical corporation and transmission owner to take remedial actions material deficiencies identified by the transmission development monitor, as specified, but consistent with and not in exceedance of the CPUC’s authority with respect to federal law.
- Makes legislative findings and declares that Section 1 of the bill, which adds Section 769.4, to the Public Utilities Code, imposes a limitation on the public’s right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article 1 of the California Constitution in order to protect the confidential and market-sensitive information of an entity subject to Section 1 of this act.
Background
SB 100/SB 1020 clean energy goals. With the adoption of SB 100 (De León, Chapter 312, Statutes of 2018) and SB 1020 (Laird, Chapter 361, Statutes of 2022) statute establishes the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90% of all retail sales of electricity to California end-use customers by December 31, 2035, 95% of all retail sales of electricity to California end-use customers by December 31, 2040, 100% of all retail sales of electricity to California end-use customers by December 31, 2045, and 100% of electricity procured to serve all state agencies by December 31, 2035. SB 100 increased the RPS requirement from 50% by 2030 to 60% of retail sales for each retail seller. SB 100 also required CARB, CEC, and CPUC to issue a joint report by January 1, 2021, and at least every four years, that describes technologies, forecasts, affordability, and system and local reliability. The report is required to include an evaluation of costs and benefits to customer rate impacts, as well as barriers to achieving the SB 100 policy. The first Joint Agency report was issued January 2021 and found that in order to meet the state’s energy goals California will need to roughly triple its current electricity power capacity.
CAISO. The CAISO is a nonprofit public benefit corporation created by California statute as part of the effort to deregulate the electricity market in the late 1990s. The CAISO manages the flow of electricity across the high-voltage bulk power system that makes up 80% of California’s, and a small part of Nevada’s, electric grid. CAISO is registered as both a transmission operator and balancing authority (BA) under federal reliability requirements. As with other BAs, the CAISO is regulated by federal statute and regulations with oversight by FERC and the North American Energy Reliability Corporation (NERC).
Transmission planning process. Each year, the CAISO conducts its TPP to identify potential system limitations as well as opportunities for system reinforcements that improve reliability and efficiency. The CAISO Transmission Plan provides a comprehensive evaluation of the CAISO transmission grid to address grid reliability requirements, identify upgrades needed to successfully meet California’s policy goals, and explore projects that can bring economic benefits to consumers. The plan relies heavily on key inputs from state agencies in translating legislative policy into actionable policy driven inputs. The development of the transmission plan entails annual public stakeholder process that is conducted pursuant to the CAISO’s FERC-approved tariff. It includes a three-phase process that leads to annual CAISO Board of Governor approval of transmission plan and associated transmission projects.
Forecasting by CEC and supply-side inputs by CPUC. The CEC conducts demand forecast that is used to inform several planning processes, including the CAISO’s TPP. The demand forecast is often a 10-year (recently 15-year) outlook for electricity and natural gas sales, consumption, and peak and hourly electricity demand. Additionally, the CPUC provides energy resource supply-side inputs, including an annual resource portfolio, to inform the transmission planning by the CAISO.
Transmission Development Forum. The Transmission Development Forum is a recent joint effort between the CAISO and the CPUC to discuss and track Participating Transmission Owners expansion and network upgrade projects and schedules. The Transmission Development Forum creates a single forum to track the status of transmission network upgrade projects that affect generators and all other transmission projects approved in the CAISO’s TPP. The effort allows for increased transparency for all stakeholders about transmission projects and enhances accountability of transmission owners by having them explain schedule changes, delays, and address stakeholders’ questions.
Tracking Energy Development (TED) Task Force. The TED Taskforce is also a recent joint effort of the CPUC, CEC, CAISO, and the Governor’s Office of Business and Economic Development (GO-Biz) to track new energy projects under development. According to the CPUC, the objective is to build on the success of ad hoc 2021 efforts to provide energy resource project development support, as appropriate, and identify barriers and mitigation strategies to accelerate energy project development.
CAISO 20-year Transmission Outlook. The CAISO embarked on creating a 20-Year Transmission Outlook for the electric grid, in collaboration with the CPUC and the CEC, with the goal of exploring the longer-term grid requirements and options for meeting California’s GHG reduction and renewable energy objectives reliably and cost-effectively. The CAISO also intends for the expanded planning horizon to provide valuable input for resource planning processes conducted by the CPUC and CEC, and to provide a longer-term context and framing of pertinent issues in the CAISO’s ongoing annual 10-Year Transmission Plan. The 2024 20-Year Transmission Outlook estimates $45 to $65 billion in transmission costs to meet the state clean energy needs, load growth, and offshore wind generation development.
CAISO reforms of interconnection queue. The CAISO has also been instituting a number of reforms to address delays, particularly as the volume of projects entering the CAISO queue has grown significantly with the passage of federal legislation by the Biden administration to incentivize clean energy, state procurement directives, resource adequacy requirements, and clean energy targets. The CAISO has implemented a number of reforms through the Interconnection Process Enhancements to modify how projects enter and advance through the queue, including screening and prioritization criteria based on commercial readiness, system need, and project viability.
Historic buildout of energy resources, but concerns project delays can stymy progress. According to the CPUC’s 2025 Annual RPS Report (November 2025), since 2020, over 24 gigawatts (GW) of new clean energy and storage resources have been interconnected to the CAISO grid, with nearly seven GW of these new resources coming online in 2024. The report further notes: “However, transmission project delays continue to be a concern in California, their impact on the interconnection of new RPS-eligible renewable generation needs to be assessed regularly.” Last year, the Governor issued an Executive Order N-33-25, which ordered the CPUC to identify critical generation and storage resources in-development and coordinate with CAISO and utilities to expedite transmission development that support the connection of new resources. Additionally, SB 1174 (Hertzberg, Chapter 229, Statutes of 2022) requires electrical corporations that are participating transmission owners to submit annual data on transmission project delays and their impact on RPS-eligible renewable generation and storage resources to the CPUC. The CPUC found the following based on the 2025 data:
- The majority of Pacific Gas & Electric (PG&E) and Southern California Edison (SCE) in-development transmission projects have been delayed past their original in-service dates at 63% and 70%, respectively, with 64% reported in development transmission projects being delayed overall.
- There are 21.8 GW of RPS-eligible renewable generation and storage resources currently in development that depend on transmission projects that have already experienced a delay in coming online.
- Of these RPS-eligible renewable generation and storage resources, 13.2 GW have already been delayed or are at risk of delay due to delayed transmission project timelines, mostly driven by bundling dependencies, materials, and other issues.
Comments
Need for this bill. According to the author:
Federal clean energy tax credits worth billions of dollars to California ratepayers are on the verge of expiring, and the single greatest obstacle to capturing those savings is completion of the grid upgrades needed to connect new clean energy projects. The CPUC’s own data shows that nearly two-thirds of these transmission upgrades are delayed, with some languishing for over a decade. AB 2493 creates the independent oversight and enforceable accountability mechanisms needed to break through these delays before it is too late.
Seeking legislative remedies to address delays in infrastructure build-out. The sponsors and supporters of this bill seek legislative remedies to address delays in interconnecting generating facilities to transmission and distribution grid. They note widespread delays in transmission projects, citing the CPUC’s 2025 RPS Report which found that 64% of in-development transmission projects are delayed past their original in-service dates, including PG&E at 63% and SCE at 70%, though San Diego Gas & Electric was excluded due to incomplete data. They further note the delay of 449 transmission projects with dependent generation, or storage is affecting 21.8 GW of clean energy and storage capacity. While they acknowledge there has been much attention to the issue at the CPUC and CAISO, the longstanding delays threaten grid reliability, clean energy progress, and the ability to access the sunsetting federal tax credits that can reduce costs for Californians. As such, the supporters seek legislative remedies to require auditing and enforcement actions of the electric investor-owned utilities (IOUs) progress to build-out the needed infrastructure.
Electric IOUs oppose the bill stating it singles them out while ignoring other responsible parties and conflicts with existing oversight. The electric IOUs raise concerns that the bill only focuses on their actions and no other responsible parties. They share that transmission and interconnection projects can often be delayed due to issues outside their control, including a project developer’s lack of financing, lack of land rights, or component supply shortages. They also raise concerns that the approved projects in the CAISO TPP are mostly conceptual and often lack critical information that must be prepared prior to determining how (or if) to file for applicable permits. They noted there is extensive work related to engineering, costs, and contracts before the projects can begin the permitting process. They raise concerns that the strict deadlines for submitting requests will result in longer permitting timelines, not shorter.
Recent amendments expand this bill to include other entities that are assigned transmission obligations in order to respond to electric IOUs’ concerns and Governor’s Office request for greater visibility on project development. The amendments add entities who are not large electrical corporations, such as independent third party-owned transmission owners, who own, control, or are assigned or obligated to construct transmission facilities subject to the jurisdiction of the FERC and is assigned construct a transmission or interconnection project that requires a CPCN or a permit to construct by the CPUC. As such, the provisions of this bill to monitor and review information and authorize the CPUC to direct remedial action would apply to a broader universe of entities, including smaller electrical corporations, independent transmission owners (third parties not the electric IOUs), and any other entities. Given the federal government’s authority, as exercised by FERC, to oversee transmission, the amendments also add that any enforcement action taken by the CPUC must be consistent with, and may not exceed its jurisdiction and authority under federal law. Thereby limiting the CPUC’s actions to those already limited by federal law.
Recent amendments provide the CPUC with implementation flexibility and make explicit that any cost recovery is subject to just and reasonable review (where applicable). The amendments authorize the CPUC to modify the scope, objectives, or reporting requirements of the transmission development monitor’s review as proposed by this bill. The CPUC may make these changes via resolution, however, only after notice and opportunity for public comment. As such, this amendment authorizes the CPUC to make changes from the review and reporting of transmission projects prescribed by this bill. An additional amendment makes explicit that compliance with a remedial action ordered by the CPUC does not create a presumption that any cost incurred can be recovered from ratepayers, as it is still subject to a determination by the CPUC that it is just and reasonable. This amendment is intended to address concerns about the costs of remedial actions.
Prior/Related Legislation
(See Senate Energy, Utilities and Communications Committee Analysis.)
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee, ongoing costs, possibly in the high hundreds of thousands of dollars annually (ratepayer funds), for the California Public Utilities Commission (CPUC) to establish a transmission development monitor and otherwise implement the provisions of this bill.
SUPPORT: (Verified 8/28/26)
American Clean Power- California (Co-source)
Union of Concerned Scientists (Co-source)
Advanced Energy United
California Energy Storage Alliance
California Environmental Voters
California Wind Energy Association
Ceres
City of Berkley
City of San Diego
County of San Diego
EDF Power Solutions
ENGIE North America
Environmental Defense Fund
Fluence Energy Systems
Independent Energy Producers Association
Large-Scale Solar Association
Natural Resources Defense Council
Ormat
Sierra Club California
Solar Energy Industries Association
OPPOSITION: (Verified 8/28/26)
Pacific Gas and Electric Company
ARGUMENTS IN SUPPORT: According to a coalition of organizations, including the co-sponsors of this bill and 14 other organizations listed above:
…California has set an ambitious goal to decarbonize its power grid by 2045. Realizing this goal depends on our ability to connect new clean power generation quickly and affordably. …Unfortunately, the IOUs are falling behind on those upgrades, delaying the addition of new power to the grid. …AB 2493 will help stabilize electricity prices and keep California’s grid reliable by requiring the large IOUs to connect new clean energy projects faster. First, AB 2493 sets a deadline for the larger IOUs to initiate permitting for major grid upgrades. Second, the bill requires an independent auditor to assess the root causes of interconnection upgrades delays and report findings to the CPUC. …An independent audit will provide the rigorous, consistent data that state regulators need to understand why projects are falling behind and what remedies will be most effective. Third, AB 2493 requires the large IOUs to develop solutions aligned with the auditor’s findings, including facilities advanced equipment procurement to mitigate supply chain constraints, expanding opportunities for entities other than the large IOUs to complete certain upgrades, and implementing a prioritization framework to fast-track upgrades that affect 100 MW or more of clean energy capacity. Finally, the bill directs the CPUC to evaluate the large IOUs’ progress in addressing interconnection delays in their rate requests and cost of capital applications.
ARGUMENTS IN OPPOSITION: According to PG&E:
AB 2493 would not address the primary drivers of delays identified in numerous publications and discussed at length in the Assembly Utilities Hearing held on February 18th. This include delays related to land rights, procurement lead times, permitting timelines, and customer-driven project design changes. Instead, AB 2493 would (1) create jurisdictional conflicts and competing compliance obligations for utilities by directing corrective actions that may be inconsistent with FERC-jurisdictional requirements and CAISO planning and cost parameters; (2) duplicative existing CPUC and CAISO oversight and reporting frameworks, including the CPUC’s Transmission Project Review Process under Resolution E-5252; (3) divert specialized engineering and interconnection staff away from completing studies and executing network upgrades; (4) increase costs for customers without clear, reasonable cost recovery parameters; (5) raise security concerns by requiring public posting of audit reports that could include sensitive critical infrastructure information; and (6) focus on utilities without addressing end-to-end contributors to delay across all responsible parties (utilities, manufacturers, land-owners, developers, and federal, state & local agencies).
ASSEMBLY FLOOR: 57-17, 5/26/26
AYES: Addis, Aguiar-Curry, Ahrens, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Connolly, Davies, Elhawary, Fong, Gabriel, Garcia, Gipson, Mark González, Haney, Harabedian, Hart, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Nguyen, Ortega, Pacheco, Papan, Patel, Pellerin, Petrie-Norris, Quirk-Silva, Ransom, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ward, Wicks, Wilson, Zbur, Rivas
NOES: Chen, DeMaio, Dixon, Ellis, Gallagher, Jeff Gonzalez, Hadwick, Hoover, Johnson, Macedo, Patterson, Ramos, Sanchez, Ta, Tangipa, Valencia, Wallis
NO VOTE RECORDED: Alanis, Castillo, Flora, Lackey, Muratsuchi, Celeste Rodriguez
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
8/30/26 14:44:14
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | AB 2493 |
THIRD READING
Bill No: AB 2493
Author: Petrie-Norris (D)
Amended: 8/13/26 in Senate
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 13-4, 6/30/26
AYES: Allen, Archuleta, Arreguín, Ashby, Becker, Caballero, Gonzalez, Hurtado, McNerney, Reyes, Richardson, Stern, Wahab
NOES: Ochoa Bogh, Dahle, Grove, Strickland
SENATE APPROPRIATIONS COMMITTEE: 5-2, 8/13/26
AYES: Cervantes, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto, Dahle
ASSEMBLY FLOOR: 57-17, 5/26/26 - See last page for vote
SUBJECT: Electrical corporations: interconnection: Public Utilities Commission: transmission development monitor.
SOURCE: American Clean Power-California
Union of Concerned Scientists
DIGEST:
This bill requires the California Public Utilities Commission (CPUC) to require specific actions to help accelerate interconnection of generating resources to electric transmission lines.
ANALYSIS:
Existing law:
- Establishes the Federal Energy Regulatory Commission (FERC) has exclusive jurisdiction over the transmission of electricity in interstate commerce and over all facilities for the transmission or sale of electricity in interstate commerce. (Federal Power Act §§§201, 205, 206 (Title 16 United States Code (USC) 824, 824d, 824e))
- Establishes and vests the CPUC with regulatory authority over public utilities, including electrical corporations. (Article 12 of the California Constitution)
- Establishes the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) and requires the CEC to assess trends in energy consumption and analyze the social, economic, and environmental consequences of trends. (Public Resources Code §25200 et seq.)
- Establishes the California Independent System Operator (CAISO) as a nonprofit public benefit corporation and requires it to ensure efficient use and reliable operation of the electrical transmission grid. (Public Utilities Code §345)
- Requires, under the California Global Warming Solutions Act of 2006, the California Air Resources Board (CARB) to adopt a statewide greenhouse gas (GHG) emissions limit. Authorized CARB to include market-based compliance mechanisms to comply with the regulations. (Health and Safety Code §38500 et seq.)
- Requires every electrical corporation that owns electrical transmission facilities to annually prepare, as part of the FERC Order 890 process, and submit to the CPUC, a report identifying any electrical transmission facility, upgrade, or enhancement that is reasonably necessary to achieve the Renewables Portfolio Standard (RPS) procurement requirements. Requires each electrical corporation that owns electrical transmission facilities to annually prepare, and submit to the CPUC, a report on any changes to previously reported in-service dates of transmission and interconnection facilities necessary to provide transmission deliverability to eligible renewable energy resources or energy storage resources that have executed interconnection agreements. (Public Utilities Code §399.13)
- Provides that the CPUC may supervise and regulate every public utility in the state and may do all things, whether specifically designated or in addition, which are necessary and convenient in the exercise of such power and jurisdiction. (Public Utilities Code §701)
- Requires the CPUC to report to the Legislature by November 1 of each year specified information in order to evaluate the progress of the state’s electrical corporations in complying with the California RPS Program (Article 16 (commencing with Section 399.11) of Chapter 2.3). This includes a systemwide assessment of delays to interconnection or transmission approvals for eligible renewable energy resources or energy storage resources, based on the annual reports submitted to the CPUC by electrical corporations pursuant to Public Utilities Code §399.13. (Public Utilities Code §913.4)
This bill:
- Requires each large electrical corporation, within 180 days following the adoption of a transmission plan by the CAISO through the transmission planning process (TPP), or a successor process, or whin 180 days following the execution of a generator interconnection agreement, that is assigned or obligated to construct a project that requires approval by the CPUC to submit to the transmission development monitor at the CPUC a project specific schedule for the project, as provided.
- Requires the CPUC, on or before July 1, 2027, to establish a transmission development monitor within the CPUC.
- Requires the transmission development monitor to monitor and review certain transmission- and interconnection-related facilities submitted by the large electrical corporation, the large electrical corporation’s progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the CAISO, the large electrical corporation’s compliance with the schedule submitted to the transmission development monitor, and the large electrical corporation’s compliance with any remedial actions ordered by the CPUC, as specified.
- Requires the transmission development monitor to report to the CPUC on an annual basis, as provided, and notify the CPUC within 15 days of identifying a material deficiency, as defined.
- Requires the CPUC, within 90 days of receiving an annual report or notification of material deficiency to issue a resolution directing the large electrical corporation to take remedial actions material deficiencies identified by the transmission development monitor, as specified.
- Makes legislative findings and declares that Section 1 of the bill, which adds Section 769.4, to the Public Utilities Code, imposes a limitation on the public’s right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article 1 of the California Constitution in order to protect the confidential and market-sensitive information of an entity (electrical corporation) subject to Section 1 of this act.
Background
SB 100/SB 1020 clean energy goals. With the adoption of SB 100 (De León, Chapter 312, Statutes of 2018) and SB 1020 (Laird, Chapter 361, Statutes of 2022) statute establishes the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90% of all retail sales of electricity to California end-use customers by December 31, 2035, 95% of all retail sales of electricity to California end-use customers by December 31, 2040, 100% of all retail sales of electricity to California end-use customers by December 31, 2045, and 100% of electricity procured to serve all state agencies by December 31, 2035. SB 100 increased the RPS requirement from 50% by 2030 to 60% of retail sales for each retail seller. SB 100 also required CARB, CEC, and CPUC to issue a joint report by January 1, 2021, and at least every four years, that describes technologies, forecasts, affordability, and system and local reliability. The report is required to include an evaluation of costs and benefits to customer rate impacts, as well as barriers to achieving the SB 100 policy. The first Joint Agency report was issued January 2021 and found that in order to meet the state’s energy goals California will need to roughly triple its current electricity power capacity.
CAISO. The CAISO is a nonprofit public benefit corporation created by California statute as part of the effort to deregulate the electricity market in the late 1990s. The CAISO manages the flow of electricity across the high-voltage bulk power system that makes up 80% of California’s, and a small part of Nevada’s, electric grid. CAISO is registered as both a transmission operator and balancing authority (BA) under federal reliability requirements. As with other BAs, the CAISO is regulated by federal statute and regulations with oversight by FERC and the North American Energy Reliability Corporation (NERC).
Transmission planning process. Each year, the CAISO conducts its TPP to identify potential system limitations as well as opportunities for system reinforcements that improve reliability and efficiency. The CAISO Transmission Plan provides a comprehensive evaluation of the CAISO transmission grid to address grid reliability requirements, identify upgrades needed to successfully meet California’s policy goals, and explore projects that can bring economic benefits to consumers. The plan relies heavily on key inputs from state agencies in translating legislative policy into actionable policy driven inputs. The development of the transmission plan entails annual public stakeholder process that is conducted pursuant to the CAISO’s FERC-approved tariff. It includes a three-phase process that leads to annual CAISO Board of Governor approval of transmission plan and associated transmission projects.
Forecasting by CEC and supply-side inputs by CPUC. The CEC conducts demand forecast that is used to inform several planning processes, including the CAISO’s TPP. The demand forecast is often a 10-year (recently 15-year) outlook for electricity and natural gas sales, consumption, and peak and hourly electricity demand. Additionally, the CPUC provides energy resource supply-side inputs, including an annual resource portfolio, to inform the transmission planning by the CAISO.
Transmission Development Forum. The Transmission Development Forum is a recent joint effort between the CAISO and the CPUC to discuss and track Participating Transmission Owners expansion and network upgrade projects and schedules. The Transmission Development Forum creates a single forum to track the status of transmission network upgrade projects that affect generators and all other transmission projects approved in the CAISO’s TPP. The effort allows for increased transparency for all stakeholders about transmission projects and enhances accountability of transmission owners by having them explain schedule changes, delays, and address stakeholders’ questions.
Tracking Energy Development (TED) Task Force. The TED Taskforce is also a recent joint effort of the CPUC, CEC, CAISO, and the Governor’s Office of Business and Economic Development (GO-Biz) to track new energy projects under development. According to the CPUC, the objective is to build on the success of ad hoc 2021 efforts to provide energy resource project development support, as appropriate, and identify barriers and mitigation strategies to accelerate energy project development.
CAISO 20-year Transmission Outlook. The CAISO embarked on creating a 20-Year Transmission Outlook for the electric grid, in collaboration with the CPUC and the CEC, with the goal of exploring the longer-term grid requirements and options for meeting California’s GHG reduction and renewable energy objectives reliably and cost-effectively. The CAISO also intends for the expanded planning horizon to provide valuable input for resource planning processes conducted by the CPUC and CEC, and to provide a longer-term context and framing of pertinent issues in the CAISO’s ongoing annual 10-Year Transmission Plan. The 2024 20-Year Transmission Outlook estimates $45 to $65 billion in transmission costs to meet the state clean energy needs, load growth, and offshore wind generation development.
CAISO reforms of interconnection queue. The CAISO has also been instituting a number of reforms to address delays, particularly as the volume of projects entering the CAISO queue has grown significantly with the passage of federal legislation by the Biden administration to incentivize clean energy, state procurement directives, resource adequacy requirements, and clean energy targets. The CAISO has implemented a number of reforms through the Interconnection Process Enhancements to modify how projects enter and advance through the queue, including screening and prioritization criteria based on commercial readiness, system need, and project viability.
Comments
Need for this bill. According to the author:
Federal clean energy tax credits worth billions of dollars to California ratepayers are on the verge of expiring, and the single greatest obstacle to capturing those savings is completion of the grid upgrades needed to connect new clean energy projects. The CPUC’s own data shows that nearly two-thirds of these transmission upgrades are delayed, with some languishing for over a decade. AB 2493 creates the independent oversight and enforceable accountability mechanisms needed to break through these delays before it is too late.
Seeking legislative remedies to address delays in infrastructure build-out. The sponsors and supporters of this bill seek legislative remedies to address delays in interconnecting generating facilities to transmission and distribution grid. They note widespread delays in transmission projects, citing the CPUC’s 2025 RPS Report which found that 64% of in-development transmission projects are delayed past their original in-service dates, including Pacific Gas & Electric (PG&E) at 63% and Southern California Edison (SCE) at 70%, though San Diego Gas & Electric was excluded due to incomplete data. They further note the delay of 449 transmission projects with dependent generation, or storage is affecting 21.8 gigawatts of clean energy and storage capacity. While they acknowledge there has been much attention to the issue at the CPUC and CAISO, the longstanding delays threaten grid reliability, clean energy progress, and the ability to access the sunsetting federal tax credits that can reduce costs for Californians. As such, the supporters seek legislative remedies to require auditing of the electric IOUs’ progress to build-out the needed infrastructure.
Electric IOUs oppose the bill stating it singles them out while ignoring other responsible parties and conflicts with existing oversight. The electric IOUs raise concerns that the bill only focuses on their actions and no other responsible parties. They share that transmission and interconnection projects can often be delayed due to issues outside their control, including a project developer’s lack of financing, lack of land rights, or component supply shortages. They also raise concerns that the approved projects in the CAISO TPP are mostly conceptual and often lack critical information that must be prepared prior to determining how (or if) to file for applicable permits. They noted there is extensive work related to engineering, costs, and contracts before the projects can begin the permitting process. They raise concerns that the strict deadlines for submitting requests will result in longer permitting timelines, not shorter.
Prior/Related Legislation
(See Senate Energy, Utilities and Communications Committee Analysis.)
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee, ongoing costs, possibly in the high hundreds of thousands of dollars annually (ratepayer funds), for the California Public Utilities Commission (CPUC) to establish a transmission development monitor and otherwise implement the provisions of this bill.
SUPPORT: (Verified 8/21/26)
American Clean Power- California (Co-source)
Union of Concerned Scientists (Co-source)
Advanced Energy United
California Energy Storage Alliance
California Environmental Voters
California Wind Energy Association
Ceres, INC.
City of Berkley
City of San Diego
County of San Diego
EDF Power Solutions
ENGIE North America
Environmental Defense Fund
Fluence Energy Systems
Independent Energy Producers Association
Large-Scale Solar Association
Natural Resources Defense Council
Ormat
Sierra Club California
Solar Energy Industries Association
OPPOSITION: (Verified 8/21/26)
Pacific Gas and Electric Company
ARGUMENTS IN SUPPORT: According to a coalition of organizations, including the co-sponsors of this bill and 14 other organizations listed above:
…California has set an ambitious goal to decarbonize its power grid by 2045. Realizing this goal depends on our ability to connect new clean power generation quickly and affordably. …Unfortunately, the IOUs are falling behind on those upgrades, delaying the addition of new power to the grid. …AB 2493 will help stabilize electricity prices and keep California’s grid reliable by requiring the large IOUs to connect new clean energy projects faster. First, AB 2493 sets a deadline for the larger IOUs to initiate permitting for major grid upgrades. Second, the bill requires an independent auditor to assess the root causes of interconnection upgrades delays and report findings to the CPUC. …An independent audit will provide the rigorous, consistent data that state regulators need to understand why projects are falling behind and what remedies will be most effective. Third, AB 2493 requires the large IOUs to develop solutions aligned with the auditor’s findings, including facilities advanced equipment procurement to mitigate supply chain constraints, expanding opportunities for entities other than the large IOUs to complete certain upgrades, and implementing a prioritization framework to fast-track upgrades that affect 100 MW or more of clean energy capacity. Finally, the bill directs the CPUC to evaluate the large IOUs’ progress in addressing interconnection delays in their rate requests and cost of capital applications.
ARGUMENTS IN OPPOSITION: According to PG&E:
AB 2493 would not address the primary drivers of delays identified in numerous publications and discussed at length in the Assembly Utilities Hearing held on February 18th. This include delays related to land rights, procurement lead times, permitting timelines, and customer-driven project design changes. Instead, AB 2493 would (1) create jurisdictional conflicts and competing compliance obligations for utilities by directing corrective actions that may be inconsistent with FERC-jurisdictional requirements and CAISO planning and cost parameters; (2) duplicative existing CPUC and CAISO oversight and reporting frameworks, including the CPUC’s Transmission Project Review Process under Resolution E-5252; (3) divert specialized engineering and interconnection staff away from completing studies and executing network upgrades; (4) increase costs for customers without clear, reasonable cost recovery parameters; (5) raise security concerns by requiring public posting of audit reports that could include sensitive critical infrastructure information; and (6) focus on utilities without addressing end-to-end contributors to delay across all responsible parties (utilities, manufacturers, land-owners, developers, and federal, state & local agencies).
ASSEMBLY FLOOR: 57-17, 5/26/26
AYES: Addis, Aguiar-Curry, Ahrens, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Connolly, Davies, Elhawary, Fong, Gabriel, Garcia, Gipson, Mark González, Haney, Harabedian, Hart, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Nguyen, Ortega, Pacheco, Papan, Patel, Pellerin, Petrie-Norris, Quirk-Silva, Ransom, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ward, Wicks, Wilson, Zbur, Rivas
NOES: Chen, DeMaio, Dixon, Ellis, Gallagher, Jeff Gonzalez, Hadwick, Hoover, Johnson, Macedo, Patterson, Ramos, Sanchez, Ta, Tangipa, Valencia, Wallis
NO VOTE RECORDED: Alanis, Castillo, Flora, Lackey, Muratsuchi, Celeste Rodriguez
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
8/21/26 16:00:48
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | AB 2493 |
THIRD READING
Bill No: AB 2493
Author: Petrie-Norris (D)
Amended: 8/13/26 in Senate
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 13-4, 6/30/26
AYES: Allen, Archuleta, Arreguín, Ashby, Becker, Caballero, Gonzalez, Hurtado, McNerney, Reyes, Richardson, Stern, Wahab
NOES: Ochoa Bogh, Dahle, Grove, Strickland
SENATE APPROPRIATIONS COMMITTEE: 5-2, 8/13/26
AYES: Cervantes, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto, Dahle
ASSEMBLY FLOOR: 57-17, 5/26/26 - See last page for vote
SUBJECT: Electrical corporations: interconnection: Public Utilities Commission: transmission development monitor.
SOURCE: American Clean Power-California
Union of Concerned Scientists
DIGEST:
This bill requires the California Public Utilities Commission (CPUC) to require specific actions to help accelerate interconnection of generating resources to electric transmission lines.
ANALYSIS:
Existing law:
- Establishes the Federal Energy Regulatory Commission (FERC) has exclusive jurisdiction over the transmission of electricity in interstate commerce and over all facilities for the transmission or sale of electricity in interstate commerce. (Federal Power Act §§§201, 205, 206 (Title 16 United States Code (USC) 824, 824d, 824e))
- Establishes and vests the CPUC with regulatory authority over public utilities, including electrical corporations. (Article 12 of the California Constitution)
- Establishes the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) and requires the CEC to assess trends in energy consumption and analyze the social, economic, and environmental consequences of trends. (Public Resources Code §25200 et seq.)
- Establishes the California Independent System Operator (CAISO) as a nonprofit public benefit corporation and requires it to ensure efficient use and reliable operation of the electrical transmission grid. (Public Utilities Code §345)
- Requires, under the California Global Warming Solutions Act of 2006, the California Air Resources Board (CARB) to adopt a statewide greenhouse gas (GHG) emissions limit. Authorized CARB to include market-based compliance mechanisms to comply with the regulations. (Health and Safety Code §38500 et seq.)
- Requires every electrical corporation that owns electrical transmission facilities to annually prepare, as part of the FERC Order 890 process, and submit to the CPUC, a report identifying any electrical transmission facility, upgrade, or enhancement that is reasonably necessary to achieve the Renewables Portfolio Standard (RPS) procurement requirements. Requires each electrical corporation that owns electrical transmission facilities to annually prepare, and submit to the CPUC, a report on any changes to previously reported in-service dates of transmission and interconnection facilities necessary to provide transmission deliverability to eligible renewable energy resources or energy storage resources that have executed interconnection agreements. (Public Utilities Code §399.13)
- Provides that the CPUC may supervise and regulate every public utility in the state and may do all things, whether specifically designated or in addition, which are necessary and convenient in the exercise of such power and jurisdiction. (Public Utilities Code §701)
- Requires the CPUC to report to the Legislature by November 1 of each year specified information in order to evaluate the progress of the state’s electrical corporations in complying with the California RPS Program (Article 16 (commencing with Section 399.11) of Chapter 2.3). This includes a systemwide assessment of delays to interconnection or transmission approvals for eligible renewable energy resources or energy storage resources, based on the annual reports submitted to the CPUC by electrical corporations pursuant to Public Utilities Code §399.13. (Public Utilities Code §913.4)
This bill:
- Requires each large electrical corporation, within 180 days following the adoption of a transmission plan by the CAISO through the transmission planning process (TPP), or a successor process, or whin 180 days following the execution of a generator interconnection agreement, that is assigned or obligated to construct a project that requires approval by the CPUC to submit to the transmission development monitor at the CPUC a project specific schedule for the project, as provided.
- Requires the CPUC, on or before July 1, 2027, to establish a transmission development monitor within the CPUC.
- Requires the transmission development monitor to monitor and review certain transmission- and interconnection-related facilities submitted by the large electrical corporation, the large electrical corporation’s progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the CAISO, the large electrical corporation’s compliance with the schedule submitted to the transmission development monitor, and the large electrical corporation’s compliance with any remedial actions ordered by the CPUC, as specified.
- Requires the transmission development monitor to report to the CPUC on an annual basis, as provided, and notify the CPUC within 15 days of identifying a material deficiency, as defined.
- Requires the CPUC, within 90 days of receiving an annual report or notification of material deficiency to issue a resolution directing the large electrical corporation to take remedial actions material deficiencies identified by the transmission development monitor, as specified.
- Makes legislative findings and declares that Section 1 of the bill, which adds Section 769.4, to the Public Utilities Code, imposes a limitation on the public’s right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article 1 of the California Constitution in order to protect the confidential and market-sensitive information of an entity (electrical corporation) subject to Section 1 of this act.
Background
SB 100/SB 1020 clean energy goals. With the adoption of SB 100 (De León, Chapter 312, Statutes of 2018) and SB 1020 (Laird, Chapter 361, Statutes of 2022) statute establishes the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90% of all retail sales of electricity to California end-use customers by December 31, 2035, 95% of all retail sales of electricity to California end-use customers by December 31, 2040, 100% of all retail sales of electricity to California end-use customers by December 31, 2045, and 100% of electricity procured to serve all state agencies by December 31, 2035. SB 100 increased the RPS requirement from 50% by 2030 to 60% of retail sales for each retail seller. SB 100 also required CARB, CEC, and CPUC to issue a joint report by January 1, 2021, and at least every four years, that describes technologies, forecasts, affordability, and system and local reliability. The report is required to include an evaluation of costs and benefits to customer rate impacts, as well as barriers to achieving the SB 100 policy. The first Joint Agency report was issued January 2021 and found that in order to meet the state’s energy goals California will need to roughly triple its current electricity power capacity.
CAISO. The CAISO is a nonprofit public benefit corporation created by California statute as part of the effort to deregulate the electricity market in the late 1990s. The CAISO manages the flow of electricity across the high-voltage bulk power system that makes up 80% of California’s, and a small part of Nevada’s, electric grid. CAISO is registered as both a transmission operator and balancing authority (BA) under federal reliability requirements. As with other BAs, the CAISO is regulated by federal statute and regulations with oversight by FERC and the North American Energy Reliability Corporation (NERC).
Transmission planning process. Each year, the CAISO conducts its TPP to identify potential system limitations as well as opportunities for system reinforcements that improve reliability and efficiency. The CAISO Transmission Plan provides a comprehensive evaluation of the CAISO transmission grid to address grid reliability requirements, identify upgrades needed to successfully meet California’s policy goals, and explore projects that can bring economic benefits to consumers. The plan relies heavily on key inputs from state agencies in translating legislative policy into actionable policy driven inputs. The development of the transmission plan entails annual public stakeholder process that is conducted pursuant to the CAISO’s FERC-approved tariff. It includes a three-phase process that leads to annual CAISO Board of Governor approval of transmission plan and associated transmission projects.
Forecasting by CEC and supply-side inputs by CPUC. The CEC conducts demand forecast that is used to inform several planning processes, including the CAISO’s TPP. The demand forecast is often a 10-year (recently 15-year) outlook for electricity and natural gas sales, consumption, and peak and hourly electricity demand. Additionally, the CPUC provides energy resource supply-side inputs, including an annual resource portfolio, to inform the transmission planning by the CAISO.
Transmission Development Forum. The Transmission Development Forum is a recent joint effort between the CAISO and the CPUC to discuss and track Participating Transmission Owners expansion and network upgrade projects and schedules. The Transmission Development Forum creates a single forum to track the status of transmission network upgrade projects that affect generators and all other transmission projects approved in the CAISO’s TPP. The effort allows for increased transparency for all stakeholders about transmission projects and enhances accountability of transmission owners by having them explain schedule changes, delays, and address stakeholders’ questions.
Tracking Energy Development (TED) Task Force. The TED Taskforce is also a recent joint effort of the CPUC, CEC, CAISO, and the Governor’s Office of Business and Economic Development (GO-Biz) to track new energy projects under development. According to the CPUC, the objective is to build on the success of ad hoc 2021 efforts to provide energy resource project development support, as appropriate, and identify barriers and mitigation strategies to accelerate energy project development.
CAISO 20-year Transmission Outlook. The CAISO embarked on creating a 20-Year Transmission Outlook for the electric grid, in collaboration with the CPUC and the CEC, with the goal of exploring the longer-term grid requirements and options for meeting California’s GHG reduction and renewable energy objectives reliably and cost-effectively. The CAISO also intends for the expanded planning horizon to provide valuable input for resource planning processes conducted by the CPUC and CEC, and to provide a longer-term context and framing of pertinent issues in the CAISO’s ongoing annual 10-Year Transmission Plan. The 2024 20-Year Transmission Outlook estimates $45 to $65 billion in transmission costs to meet the state clean energy needs, load growth, and offshore wind generation development.
CAISO reforms of interconnection queue. The CAISO has also been instituting a number of reforms to address delays, particularly as the volume of projects entering the CAISO queue has grown significantly with the passage of federal legislation by the Biden administration to incentivize clean energy, state procurement directives, resource adequacy requirements, and clean energy targets. The CAISO has implemented a number of reforms through the Interconnection Process Enhancements to modify how projects enter and advance through the queue, including screening and prioritization criteria based on commercial readiness, system need, and project viability.
Comments
Need for this bill. According to the author:
Federal clean energy tax credits worth billions of dollars to California ratepayers are on the verge of expiring, and the single greatest obstacle to capturing those savings is completion of the grid upgrades needed to connect new clean energy projects. The CPUC’s own data shows that nearly two-thirds of these transmission upgrades are delayed, with some languishing for over a decade. AB 2493 creates the independent oversight and enforceable accountability mechanisms needed to break through these delays before it is too late.
Seeking legislative remedies to address delays in infrastructure build-out. The sponsors and supporters of this bill seek legislative remedies to address delays in interconnecting generating facilities to transmission and distribution grid. They note widespread delays in transmission projects, citing the CPUC’s 2025 RPS Report which found that 64% of in-development transmission projects are delayed past their original in-service dates, including Pacific Gas & Electric (PG&E) at 63% and Southern California Edison (SCE) at 70%, though San Diego Gas & Electric was excluded due to incomplete data. They further note the delay of 449 transmission projects with dependent generation, or storage is affecting 21.8 gigawatts of clean energy and storage capacity. While they acknowledge there has been much attention to the issue at the CPUC and CAISO, the longstanding delays threaten grid reliability, clean energy progress, and the ability to access the sunsetting federal tax credits that can reduce costs for Californians. As such, the supporters seek legislative remedies to require auditing of the electric IOUs’ progress to build-out the needed infrastructure.
Electric IOUs oppose the bill stating it singles them out while ignoring other responsible parties and conflicts with existing oversight. The electric IOUs raise concerns that the bill only focuses on their actions and no other responsible parties. They share that transmission and interconnection projects can often be delayed due to issues outside their control, including a project developer’s lack of financing, lack of land rights, or component supply shortages. They also raise concerns that the approved projects in the CAISO TPP are mostly conceptual and often lack critical information that must be prepared prior to determining how (or if) to file for applicable permits. They noted there is extensive work related to engineering, costs, and contracts before the projects can begin the permitting process. They raise concerns that the strict deadlines for submitting requests will result in longer permitting timelines, not shorter.
Prior/Related Legislation
(See Senate Energy, Utilities and Communications Committee Analysis.)
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee, ongoing costs, possibly in the high hundreds of thousands of dollars annually (ratepayer funds), for the California Public Utilities Commission (CPUC) to establish a transmission development monitor and otherwise implement the provisions of this bill.
SUPPORT: (Verified 8/13/26)
American Clean Power- California (Co-source)
Union of Concerned Scientists (Co-source)
Advanced Energy United
California Energy Storage Alliance
California Environmental Voters
California Wind Energy Association
Ceres, INC.
EDF Power Solutions
ENGIE North America
Environmental Defense Fund
Fluence Energy Systems
Independent Energy Producers Association
Large-Scale Solar Association
Natural Resources Defense Council
Ormat
Sierra Club California
Solar Energy Industries Association
OPPOSITION: (Verified 8/13/26)
Pacific Gas and Electric Company
San Diego Gas and Electric Company
ARGUMENTS IN SUPPORT: According to a coalition of organizations, including the co-sponsors of this bill and 14 other organizations listed above:
…California has set an ambitious goal to decarbonize its power grid by 2045. Realizing this goal depends on our ability to connect new clean power generation quickly and affordably. …Unfortunately, the IOUs are falling behind on those upgrades, delaying the addition of new power to the grid. …AB 2493 will help stabilize electricity prices and keep California’s grid reliable by requiring the large IOUs to connect new clean energy projects faster. First, AB 2493 sets a deadline for the larger IOUs to initiate permitting for major grid upgrades. Second, the bill requires an independent auditor to assess the root causes of interconnection upgrades delays and report findings to the CPUC. …An independent audit will provide the rigorous, consistent data that state regulators need to understand why projects are falling behind and what remedies will be most effective. Third, AB 2493 requires the large IOUs to develop solutions aligned with the auditor’s findings, including facilities advanced equipment procurement to mitigate supply chain constraints, expanding opportunities for entities other than the large IOUs to complete certain upgrades, and implementing a prioritization framework to fast-track upgrades that affect 100 MW or more of clean energy capacity. Finally, the bill directs the CPUC to evaluate the large IOUs’ progress in addressing interconnection delays in their rate requests and cost of capital applications.
ARGUMENTS IN OPPOSITION: According to PG&E:
AB 2493 would not address the primary drivers of delays identified in numerous publications and discussed at length in the Assembly Utilities Hearing held on February 18th. This include delays related to land rights, procurement lead times, permitting timelines, and customer-driven project design changes. Instead, AB 2493 would (1) create jurisdictional conflicts and competing compliance obligations for utilities by directing corrective actions that may be inconsistent with FERC-jurisdictional requirements and CAISO planning and cost parameters; (2) duplicative existing CPUC and CAISO oversight and reporting frameworks, including the CPUC’s Transmission Project Review Process under Resolution E-5252; (3) divert specialized engineering and interconnection staff away from completing studies and executing network upgrades; (4) increase costs for customers without clear, reasonable cost recovery parameters; (5) raise security concerns by requiring public posting of audit reports that could include sensitive critical infrastructure information; and (6) focus on utilities without addressing end-to-end contributors to delay across all responsible parties (utilities, manufacturers, land-owners, developers, and federal, state & local agencies).
ASSEMBLY FLOOR: 57-17, 5/26/26
AYES: Addis, Aguiar-Curry, Ahrens, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Connolly, Davies, Elhawary, Fong, Gabriel, Garcia, Gipson, Mark González, Haney, Harabedian, Hart, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Nguyen, Ortega, Pacheco, Papan, Patel, Pellerin, Petrie-Norris, Quirk-Silva, Ransom, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ward, Wicks, Wilson, Zbur, Rivas
NOES: Chen, DeMaio, Dixon, Ellis, Gallagher, Jeff Gonzalez, Hadwick, Hoover, Johnson, Macedo, Patterson, Ramos, Sanchez, Ta, Tangipa, Valencia, Wallis
NO VOTE RECORDED: Alanis, Castillo, Flora, Lackey, Muratsuchi, Celeste Rodriguez
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
8/17/26 11:21:59
**** END ****
SENATE COMMITTEE ON
Senator Sabrina Cervantes, Chair
2025 - 2026 Regular Session
AB 2493 (Petrie-Norris) - Electrical corporations: interconnection: transmission: permitting: auditor
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would require each large electrical corporation to initiate permitting within one year of a transmission plan adoption or generator interconnection agreement execution, to retain an independent third-party auditor to review transmission and interconnection project progress, and to take remedial actions addressing any deficiencies the auditor identifies.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on August 13, 2026
Fiscal Impact:
- Ongoing costs, possibly in the high hundreds of thousands of dollars annually (ratepayer funds), for the California Public Utilities Commission (CPUC) to establish a transmission development monitor and otherwise implement the provisions of this bill.
Author Amendments:
Author amendments would require the CPUC to establish a transmission development monitor within the CPUC in lieu of the permitting and auditor requirements.
-- END --
SENATE COMMITTEE ON
Senator Sabrina Cervantes, Chair
2025 - 2026 Regular Session
AB 2493 (Petrie-Norris) - Electrical corporations: interconnection: transmission: permitting: auditor
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would require each large electrical corporation to initiate permitting within one year of a transmission plan adoption or generator interconnection agreement execution, to retain an independent third-party auditor to review transmission and interconnection project progress, and to take remedial actions addressing any deficiencies the auditor identifies.
Fiscal Impact:
- Ongoing costs in the high hundreds of thousands of dollars annually (ratepayer funds) for the CPUC to coordinate with auditors, review audit reports, order remedial actions, and conduct enforcement activities — among other things.
- To the extent that this bill impacts energy rates, it could result in costs or savings to the state as a ratepayer (various funds). The State of California is an electricity customer, purchasing roughly one percent of the electricity sold by the state's utilities. As such, the state incurs costs when rates increase, and realizes cost savings if rates go down. By requiring each large electrical corporation to retain an independent third-party auditor, this bill could increase costs recovered in rates. To the extent the auditor's findings and the resulting remedial actions improve efficiency and transparency in transmission and interconnection project delivery, this bill could also reduce costs recovered in rates.
Background:
Transmission planning and permitting. State law establishes targets for renewable and zero-carbon resources to supply 90% of retail electricity sales by 2035, 95% by 2040, and 100% by 2045. Meeting those targets requires connecting substantial new generation and storage to the grid, which in turn requires transmission capacity to deliver it. CAISO, the nonprofit corporation managing the high-voltage grid serving roughly 80% of the state, identifies needed transmission projects each year through its transmission planning process, and assigns them to the utilities that own the affected facilities. Those utilities must then obtain CPUC approval to build, under procedures that scale with project size — smaller projects proceed through a streamlined advice letter process, while the largest require a full certificate of public convenience and necessity including environmental review. The interval between CAISO approval and completed construction is where the delays at issue in this bill occur.
Extent of delays. The CPUC's 2025 RPS Report found that 64% of in-development transmission projects are delayed past their original in-service dates, including Pacific Gas and Electric at 63% and Southern California Edison at 70%. Proponents note that 449 delayed transmission projects with dependent generation or storage are affecting 21.8 gigawatts of clean energy and storage capacity. Recent CPUC findings also indicate that utilities often take several years between transmission project approval and initiation of CPUC permitting applications.
Scale of the buildout. CAISO's 2024 20-Year Transmission Outlook, developed in collaboration with the CPUC and CEC, estimates $45 to $65 billion in transmission costs to meet the state's clean energy needs, load growth, and offshore wind generation development. Transmission owners recover the costs of CAISO-approved projects through the Transmission Access Charge, submitting an application to FERC, which approves just and reasonable costs and rate of return.
Existing oversight. The Transmission Development Forum, a joint effort of CAISO and the CPUC, tracks the status of transmission network upgrade projects and requires transmission owners to explain schedule changes and delays. The Tracking Energy Development Task Force, a joint effort of the CPUC, CEC, CAISO, and GO-Biz, tracks new energy projects to identify barriers and mitigation strategies. CAISO has implemented reforms through its Interconnection Process Enhancements using screening and prioritization criteria based on commercial readiness, system need, and project viability, though those reforms generally do not address delays occurring after studies are completed, including utility permitting and construction of required upgrades. Existing CPUC reporting relies largely on utility-submitted information regarding transmission project status and delays.
Precedent for the audit structure. SB 254 (Becker, 2025) required the CPUC to direct each electrical corporation to retain an independent third-party auditor to review the utility's practices for energizing new customers and planning for demand growth, and authorized the CPUC to require remedial actions to address identified deficiencies. The Budget Act of 2026 funded SB 254 implementation at $1,911,000 ongoing and 8.0 positions from the Public Utilities Commission Utilities Reimbursement Account, plus $400,000 and 2.0 positions at the Public Advocates Office.
Proposed Law:
This bill would:
- Require each large electrical corporation assigned or obligated to construct a project requiring CPUC approval to initiate permitting by filing an application or other notice under General Order 131-E within one year following adoption of each CAISO transmission plan, and within one year following execution of a generator interconnection agreement.
- Authorize a large electrical corporation to request an extension of those deadlines by demonstrating good cause in a written notice served at least 30 days before the deadline, specifying the actions being undertaken to resolve the principal causes of delay. a. Provide that good cause may include preparatory conditions such as engineering completion, environmental assessments, and necessary coordination with affected stakeholders, and factors the auditor determines are beyond the corporation's reasonable control, including supply chain constraints and permitting delays at federal, state, or local agencies.
- Subject a large electrical corporation to enforcement action under Public Utilities Code §701 if it fails to adhere to those timelines or to make a timely extension request.
- Require each large electrical corporation, beginning July 1, 2027, to retain an independent third-party auditor selected and approved by the CPUC to review the corporation's submissions under Resolution E-5252 and §399.13(a)(2)(B), its progress on completing network upgrades following approval in a generator interconnection agreement or CAISO-approved transmission plan, its compliance with the permitting deadlines, and its compliance with any remedial actions ordered. a. Require the CPUC, in consultation with the Public Advocates Office, to select the auditor and ensure the auditor has no conflict of interest due to other work, contracts, or business relationships with the corporation. b. Require the auditor to report annually, with reports posted on the CPUC's internet website and incorporated into the CPUC's annual RPS reporting.
- Require a large electrical corporation to take remedial actions addressing any deficiencies identified in the auditor's report, which may include:
a. Reallocating staff or capital resources to complete high-priority upgrades, meaning transmission, distribution, or interconnection facilities affecting the interconnection or deliverability of at least 100 megawatts of generating or storage capacity.
b. Facilitating advanced procurement of equipment or equipment sharing with other electrical corporations to address supply chain delays.
c. Interim deliverability or temporary generator interconnection solutions.
d. Enabling generators to procure equipment on behalf of the corporation, while ensuring the equipment meets necessary safety, performance, and reliability specifications.
e. Enabling self-build options by generators or transmission solutions developed by another electrical corporation, including permitting, design, procurement, construction, or commissioning by an entity other than the large electrical corporation.
f. Expediting engineering, design, permitting, and other preconstruction work for high-priority upgrades.
- Provide that a large electrical corporation's record of compliance with ordered remedial actions would be admissible evidence and considered by the CPUC in any decision approving a rate or cost of capital application filed under §451.
- Specify that the section would not authorize an electrical corporation to seek, or the CPUC to approve, an increase in a revenue requirement or cost of capital under §451 based on compliance with any remedial actions ordered.
Related Legislation:
AB 2111 (Papan, 2026) would require various actions to better incorporate uncertainty and risk in resource portfolio planning to inform transmission planning. The bill would require the CEC and CPUC, in coordination with the CAISO, on or before January 1, 2028, to incorporate specified requirements into an update to the Memorandum of Understanding (MOU) regarding transmission and resource planning adopted by the CEC, CPUC, and CAISO on December 23, 2022, and any related workplan.
AB 2369 (Rogers, 2026) would require the CPUC and CEC to provide transmission-focused information to the CAISO to identify cost-effective opportunities to increase the reliability contribution or mitigate congestion of planned or existing energy-only resources through transmission capacity expansions.
SB 254 (Becker, 2025) among its provisions, established the Transmission Infrastructure Accelerator and required the GO-Biz Energy Unit, in coordination with specified entities, to develop a financing and development strategy for eligible transmission projects, select projects that may receive public financing, and take steps to accelerate transmission development. The bill also required the CPUC to direct each electrical corporation to retain an independent third-party auditor to review the utility's practices for energizing new customers and planning for demand growth, to evaluate current and future energization performance, and to report to the CPUC on a biannual basis, and authorized the CPUC to require remedial actions to address deficiencies the auditor identifies.
AB 2779 (Petrie-Norris, 2024) required the CAISO, upon approval of each transmission plan, to report to the CPUC and the relevant policy committees of the Legislature any new use of grid-enhancing technology deemed reasonable in that plan, and the costs and efficiency savings associated with that technology.
SB 1006 (Padilla, 2024) required electrical corporations to evaluate the use of advanced conductors and grid-enhancing technologies to increase transmission capacity and to report those evaluations to the CAISO.
SB 319 (McGuire, 2023) required specified actions related to electric transmission planning, including a review and update to a December 2022 MOU and related workplan among California energy agencies and the CAISO, the development of an electrical transmission infrastructure guidebook, and a report to the Legislature regarding the status of transmission projects.
AB 50 (Wood, 2023) established interim timelines for large electrical corporations to energize customers following a commitment to serve, entitled customers to a bill credit for missed dates, and directed the CPUC to set criteria for timely service.
SB 410 (Becker, 2023) established the Powering Up Californians Act, which required the CPUC to establish reasonable average and maximum target energization time periods, a process for customers to report delays, remedial actions to meet the targets, and independent third-party assessment of each utility's energization performance.
SB 1174 (Hertzberg, 2022) required large electrical corporations that are participating transmission owners to submit annual data on transmission project delays and their impact on RPS-eligible generation and storage, incorporated into the CPUC's annual RPS Report.
SB 529 (Hertzberg, 2022) required the CPUC to update General Order 131-D to allow IOUs to use the Permit to Construct process or claim an exemption for modifications to existing transmission facilities above the 200 kV threshold, to reduce permitting timelines for upgrades to existing infrastructure.
SB 887 (Becker, 2022) among its provisions, required the CPUC, in consultation with the CEC and the CARB, to provide transmission-focused guidance to the CAISO about resource portfolios of expected future renewable energy resources and zero-carbon resources to allow the CAISO to identify and approve transmission facilities needed to allow for full deliverability of those resources to load centers.
SB 100 (De León, 2018) established the 100 Percent Clean Energy Act, which increased the RPS requirement from 50% by 2030 to 60% and established a state policy that eligible renewable and zero-carbon resources supply 100% of retail electricity sales by December 31, 2045.
SB 350 (De León, 2015) established the Clean Energy and Pollution Reduction Act, which increased the RPS requirement from 33% to 50% by 2030 and created the integrated resource plan process at the CPUC to ensure long-term electricity planning aligns with the state's GHG reduction targets while maintaining reliability and controlling costs.
Staff Comments:
The CPUC's energy work is supported by ratepayer funds through the Public Utilities Commission Utilities Reimbursement Account (PUCURA), funded through a fee on utilities' gross intrastate revenues. The Budget Act of 2026 was signed June 29, 2026 — AB 109 (Chapter 19, Statutes of 2026), as amended by SB 111 (Chapter 21, Statutes of 2026) — authorizing $351.7 billion in total state spending, including $251.5 billion from the General Fund, with total reserves of $35.2 billion.
Recent CPUC allocations. The budget approved $1,911,000 ongoing from PUCURA for 8.0 positions in 2026-27 and ongoing to implement SB 254 (Becker, 2025), and allowed $400,000 to the Public Utilities Commission Public Advocates Office Account and 2.0 positions to implement the same measure, for ongoing audits, securitization, and wildfire safety. It provided $1,914,000 from PUCURA and 8 positions ongoing to oversee the expedited review of 10-year undergrounding plan program requirements developed in response to SB 884 (2022), and $216,000 from PUCURA in 2026-27 and ongoing for the conversion of 1.0 limited-term Public Utilities Regulatory Analyst V position to a permanent position to address an increase in electrical transmission permitting tied to SB 319 (McGuire, 2023). The budget also appropriated $1,925,000 from PUCURA and 8.0 permanent positions in 2026-27 and ongoing to implement AB 825 (2025); funded $952,000 ongoing from PUCURA for 4.0 positions to implement AB 1167 (2025); and funded $668,000 from PUCURA and 3.0 permanent positions in 2026-27 to meet the January 2027 legislative reporting requirement under SB 57 (Padilla, 2025), with $523,000 ongoing thereafter to address increasing analytical, regulatory, and oversight workload associated with new large data center electrical loads.
Vacancy eliminations rejected. The budget maintained seven vacant full-time equivalent positions and $1.3 million in special funds at the CPUC, as part of 356.2 positions and $39.8 million preserved across departments within the Natural Resources and Environmental Protection agencies by rejecting the Governor's proposed vacancy eliminations.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Benjamin Allen, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 6/30/2026
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill requires the California Public Utilities Commission (CPUC) to require specific actions to help accelerate interconnection of generating resources to electric transmission lines, including requiring each large electrical corporation to retain an independent third-party auditor to review transmission-and interconnection-related project delays; requires large electrical corporations to begin the permitting process within one year of the adoption of the transmission project in the annual transmission plan; and requires penalties for the failure to meet the requirements of this bill.
ANALYSIS:
Existing law:
- Establishes the Federal Energy Regulatory Commission (FERC) has exclusive jurisdiction over the transmission of electricity in interstate commerce and over all facilities for the transmission or sale of electricity in interstate commerce. (Federal Power Act §§§201, 205, 206 (16 USC 824, 824d, 824e))
- Establishes and vests the CPUC with regulatory authority over public utilities, including electrical corporations. (Article 12 of the California Constitution)
- Establishes the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)). Requires the CEC to assess trends in energy consumption and analyze the social, economic, and environmental consequences of trends. (Public Resources Code §25200 et seq.)
- Establishes the California Independent System Operator (CAISO) as a nonprofit public benefit corporation and requires it to ensure efficient use and reliable operation of the electrical transmission grid. (Public Utilities Code §345)
- Requires, under the California Global Warming Solutions Act of 2006, the California Air Resources Board (CARB) to adopt a statewide greenhouse gas (GHG) emissions limit. Authorized CARB to include market-based compliance mechanisms to comply with the regulations. (Health and Safety Code §38500 et seq.)
- Requires the CPUC, if it determines that the rules, practices, equipment, appliances, facilities, or service of a public utility, or the methods of manufacture, distribution, transmission, storage, or supply used by the public utility, are unjust, unreasonable, unsafe, improper, inadequate, or insufficient, to determine and fix the rules, practices, equipment, appliances, facilities, service, or methods to be observed, furnished, constructed, enforced, or employed. (Public Utilities Code §451)
- Requires the CPUC to direct each electrical corporation to annually prepare a renewable energy procurement plan that includes specified elements to satisfy its obligations under the Renewables Portfolio Standard (RPS), and requires the CPUC, to the extent feasible, to review and adopt the plan as part of the general procurement plan process. (Public Utilities Code §399.13 (a)(1))
- Requires every electrical corporation that owns electrical transmission facilities to annually prepare, as part of the FERC Order 890 process, and submit to the CPUC, a report identifying any electrical transmission facility, upgrade, or enhancement that is reasonably necessary to achieve the RPS procurement requirements of this article. Requires each report to look forward at least five years and, to ensure that adequate investments are made in a timely manner, and include a preliminary schedule when an application for a certificate of public convenience and necessity (CPCN) will be made, pursuant to Chapter 5 (commencing with Section 1001), for any electrical transmission facility identified as being reasonably necessary to achieve the renewable energy resources procurement requirements. Requires each electrical corporation that owns electrical transmission facilities shall ensure that project-specific interconnection studies are completed in a timely manner. (Public Utilities Code §399.13 (a)(2)(A))
- Requires each electrical corporation that owns electrical transmission facilities to annually prepare, and submit to the CPUC, a report on any changes to previously reported in-service dates of transmission and interconnection facilities necessary to provide transmission deliverability to eligible renewable energy resources or energy storage resources that have executed interconnection agreements. Requires the report to be provided concurrently with each electrical corporation’s annual renewable energy procurement plan and identify the reason for any changes to the status of in-service dates. (Public Utilities Code §399.13 (a)(2)(B))
- Provides that the CPUC may supervise and regulate every public utility in the state and may do all things, whether specifically designated or in addition, which are necessary and convenient in the exercise of such power and jurisdiction. (Public Utilities Code §701)
- Requires the CPUC to report to the Legislature by November 1 of each year specified information in order to evaluate the progress of the state’s electrical corporations in complying with the California RPS Program (Article 16 (commencing with Section 399.11) of Chapter 2.3). This includes a systemwide assessment of delays to interconnection or transmission approvals for eligible renewable energy resources or energy storage resources, based on the annual reports submitted to the CPUC by electrical corporations pursuant to Public Utilities Code §399.13. (Public Utilities Code §913.4)
- Prohibits an electrical corporation from beginning construction of a line, plant, or system, or of any extension thereof, without having first obtained from the CPUC a certificate that the present or future public convenience and necessity requires or will require its construction. (Public Utilities Code §1001)
- Requires the CPUC, in a proceeding evaluating the issuance of a CPCN for a proposed transmission project, to establish a rebuttal presumption with regard to need for a proposed transmission project in favor of CAISO governing-board approved need evaluation if specified conditions are met. (Public Utilities Code §1001.1)
This bill:
- Requires each large electrical corporation, within one year following the adoption of each transmission plan produced by the CAISO through the transmission planning process (TPP), or a successor process, and within one year following the execution of a generator interconnection agreement, that is assigned or obligated to construct a project that requires approval by the CPUC to initiate permitting for the project by filing an application or other notice, as applicable, pursuant to a specific General Order (GO) 131-E.
- Authorizes a large electrical corporation to request an extension of the filing deadline by demonstrating good cause in a written notice to the CPUC, as provided. Requires the CPUC to take appropriate enforcement action, as specified, if a large electrical corporation fails to adhere to these timelines, or to make a timely extension request.
- Requires the CPUC, beginning January 1, 2027, to require each large electrical corporation, as defined, to retain an independent third-party auditor to review certain transmission- and interconnection-related submissions made by the large electrical corporation, the large electrical corporation’s progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the CAISO, the large electrical corporation’s compliance with the above-described permitting deadlines, and the large electrical corporation’s compliance with any remedial actions ordered by the CPUC, as specified.
- Requires the third-party auditor to report to the CPUC on an annual basis, as provided.
- Requires the CPUC, within 90 days of receiving the auditor’s report, to issue a resolution directing a large electrical corporation to take remedial actions to address any and all deficiencies identified by the auditor, as specified.
Background
SB 100/SB 1020 clean energy goals. With the adoption of SB 100 (De León, Chapter 312, Statutes of 2018) and SB 1020 (Laird, Chapter 361, Statutes of 2022) statute establishes the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90% of all retail sales of electricity to California end-use customers by December 31, 2035, 95% of all retail sales of electricity to California end-use customers by December 31, 2040, 100% of all retail sales of electricity to California end-use customers by December 31, 2045, and 100% of electricity procured to serve all state agencies by December 31, 2035. SB 100 increased the RPS requirement from 50% by 2030 to 60% of retail sales for each retail seller. SB 100 also required CARB, CEC, and CPUC to issue a joint report by January 1, 2021, and at least every four years, that describes technologies, forecasts, affordability, and system and local reliability. The report is required to include an evaluation of costs and benefits to customer rate impacts, as well as barriers to achieving the SB 100 policy. The first Joint Agency report was issued January 2021 and found that in order to meet the state’s energy goals California will need to roughly triple its current electricity power capacity.
CAISO. The CAISO is a nonprofit public benefit corporation created by California statute as part of the effort to deregulate the electricity market in the late 1990s. The CAISO manages the flow of electricity across the high-voltage bulk power system that makes up 80% of California’s, and a small part of Nevada’s, electric grid. CAISO is registered as both a transmission operator and balancing authority (BA) under federal reliability requirements. As with other BAs, the CAISO is regulated by federal statute and regulations with oversight by FERC and the North American Energy Reliability Corporation (NERC).
Transmission planning process. Each year, the CAISO conducts its TPP to identify potential system limitations as well as opportunities for system reinforcements that improve reliability and efficiency. The transmission plan fulfills the CAISO’s core responsibility to identify and plan the development of solutions, transmission or otherwise, to meet the future needs of the electricity grid. The CAISO Transmission Plan provides a comprehensive evaluation of the CAISO transmission grid to address grid reliability requirements, identify upgrades needed to successfully meet California’s policy goals, and explore projects that can bring economic benefits to consumers. The plan relies heavily on key inputs from state agencies in translating legislative policy into actionable policy driven inputs. The development of the transmission plan entails annual public stakeholder process that is conducted pursuant to the CAISO’s FERC-approved tariff. It includes a three-phase process that leads to annual CAISO Board of Governor approval of transmission plan and associated transmission projects. The plan is prepared in the larger context of supporting important energy and environmental policies while maintaining reliability through a resilient electric system.
There are three main categories of CAISO approved transmission projects:
- Reliability projects to meet federal standards.
- Policy projects to meet state policy goals (i.e., renewable portfolio standard).
- Economic projects that reduce congestion, production costs, transmission losses, capacity requirements or other electric supply costs.
Additionally, there are other transmission planning efforts, including local capacity requirements, special studies, interregional transmission project, and others. Transmission owners recover the costs of CAISO-approved projects through the Transmission Access Charge. The transmission owner submits an application to FERC to recover project costs. FERC approves just and reasonable costs and rate of return. CAISO charges transmission customers based on FERC-approved costs.
Forecasting by CEC and supply-side inputs by CPUC. The CEC conducts demand forecast that is used to inform several planning processes, including the CAISO’s TPP. The demand forecast is often a 10-year (recently 15-year) outlook for electricity and natural gas sales, consumption, and peak and hourly electricity demand. Additionally, the CPUC provides energy resource supply-side inputs, including an annual resource portfolio, to inform the transmission planning by the CAISO.
Transmission Development Forum. The Transmission Development Forum is a recent joint effort between the CAISO and the CPUC to discuss and track Participating Transmission Owners expansion and network upgrade projects and schedules. The Transmission Development Forum creates a single forum to track the status of transmission network upgrade projects that affect generators and all other transmission projects approved in the CAISO’s TPP. The effort allows for increased transparency for all stakeholders about transmission projects and enhances accountability of transmission owners by having them explain schedule changes, delays, and address stakeholders’ questions.
Tracking Energy Development (TED) Task Force. The TED Taskforce is also a recent joint effort of the CPUC, CEC, CAISO, and the Governor’s Office of Business and Economic Development (GO-Biz) to track new energy projects under development. According to the CPUC, the objective is to build on the success of ad hoc 2021 efforts to provide energy resource project development support, as appropriate, and identify barriers and mitigation strategies to accelerate energy project development.
CPUC’s GO 131-E. GO 131-E specifically addresses the procedures to be followed in applications for siting of electric transmission infrastructure. In essence, it implements the requirements of Public Utilities Code §1001. Under GO 131-E, the CPUC has established the criteria that would trigger the need for a permit to build or renovate electrical facilities, including transmission lines and substations. Of the hundreds of major capital electric transmission projects completed in California each year, on average one-two per year may trigger a permit, and thus California Environmental Quality Act (CEQA). Most projects are reviewed through the CPUC’s advice letter approval process, which tends to be more simplified and expedient than a full application for a CPCN.
The level of analysis performed by the CPUC varies with the size (measured in voltage) of the transmission project.
- Projects below 50 kilovolts (kV) are considered distribution projects, rather than transmission projects, and in general do not require CPUC approval.
- Projects between 50 kV and 200 kV require a Permit to Construct (PTC) from the CPUC, which consists primarily of an environmental review pursuant to CEQA, except for upgrades to substations and switchyards that do not expand land area beyond the existing property. The CPUC process generally does not require a detailed analysis of the need for or economics of these projects.
- Projects over 200 kV (except for an extension, expansion, upgrade or other modification irrespective if the facility is above 200 kV voltage level) require a CPCN from the CPUC. The CPCN process analyzes the need for the project and the economics of the project, as well as the environmental impacts of the project.
CAISO 20-year Transmission Outlook. The CAISO embarked on creating a 20-Year Transmission Outlook for the electric grid, in collaboration with the CPUC and the CEC, with the goal of exploring the longer-term grid requirements and options for meeting California’s GHG reduction and renewable energy objectives reliably and cost-effectively. The CAISO also intends for the expanded planning horizon to provide valuable input for resource planning processes conducted by the CPUC and CEC, and to provide a longer-term context and framing of pertinent issues in the CAISO’s ongoing annual 10-Year Transmission Plan. The 2024 20-Year Transmission Outlook estimates $45 to $65 billion in transmission costs to meet the state clean energy needs, load growth, and offshore wind generation development.
CAISO reforms of interconnection queue. The CAISO has also been instituting a number of reforms to address delays, particularly as the volume of projects entering the CAISO queue has grown significantly with the passage of federal legislation by the Biden administration to incentivize clean energy, state procurement directives, resource adequacy requirements, and clean energy targets. The CAISO has implemented a number of reforms through the Interconnection Process Enhancements to modify how projects enter and advance through the queue, including screening and prioritization criteria based on commercial readiness, system need, and project viability.
Comments
Need for this bill. According to the author:
Federal clean energy tax credits worth billions of dollars to California ratepayers are on the verge of expiring, and the single greatest obstacle to capturing those savings is completion of the grid upgrades needed to connect new clean energy projects. The CPUC’s own data shows that nearly two-thirds of these transmission upgrades are delayed, with some languishing for over a decade. AB 2493 creates the independent oversight and enforceable accountability mechanisms needed to break through these delays before it is too late.
Seeking legislative remedies to address delays in infrastructure build-out. The sponsors and supporters of this bill seek legislative remedies to address delays in interconnecting generating facilities to transmission and distribution grid. They note widespread delays in transmission projects, citing the CPUC’s 2025 RPS Report which found that 64% of in-development transmission projects are delayed past their original in-service dates, including Pacific Gas & Electric (PG&E) at 63% and Southern California Edison (SCE) at 70%, though San Diego Gas & Electric was excluded due to incomplete data. They further note that 449 delayed transmission projects with dependent generation or storage is affecting 21.8 gigawatts of clean energy and storage capacity. While they acknowledge there has been much attention to the issue at the CPUC and CAISO, the longstanding delays threaten grid reliability, clean energy progress, and the ability to access the sunsetting federal tax credits that can reduce costs for Californians. As such, the supporters seek legislative remedies to require auditing of the electric IOUs’ progress to build-out the needed infrastructure, require the IOUs to begin permitting within one year of a transmission project being included in the CAISO adopted TPP, mandatory third-party auditing, remedial action orders by the CPUC, including a reduction of the return on equity within the cost of capital proceeding.
Electric IOUs oppose the bill singles them out while ignoring other responsible parties and conflicts with existing oversight. The electric IOUs raise concerns that the bill only focuses on their actions and no other responsible parties. They share that transmission and interconnection projects can often be delayed due to issues outside their control, including a project developer’s lack of financing, lack of land rights, or component supply shortages. They also raise concerns that the approved projects in the CAISO TPP are mostly conceptual and often lack critical information that must be prepared prior to determining how (or if) to file for applicable permits. They noted there is extensive work related to engineering, costs, and contracts before the projects can begin the permitting process. They raise concerns that the strict deadlines for submitting requests will result in longer permitting timelines, not shorter.
This bill’s inclusion of an auditor for transmission and interconnection projects mimics SB 254 (Becker, Chapter 119, Statutes of 2025). SB 254, among other energy provisions, required the CPUC to direct each electrical corporation to retain an independent third-party auditor to review the utility’s practices for energizing new customers and planning for demand growth, to evaluate current and future energization performance, and to report to the CPUC on a biannual basis, and authorizes the CPUC to require remedial actions to address deficiencies the auditor identifies. AB 2493’s audit and remedial actions proposal for transmission and interconnection projects attempts to mimic the approach in SB 254. Electric investor-owned utilities (IOUs) suggest a more reasonable approach would be to fund this work through existing public oversight resources (e.g. CPUC staffing) or jointly funded with generation developers. Electric IOUs also raise concerns authorizing the CPUC to require remedial actions and impacts to the cost of capital which they argue would conflate FERC jurisdictional authority for transmission related costs. As this bill proceeds, the author may wish to amend this bill to remove financial assessments on FERC tariffs and instead have the CPUC make recommendations to the CAISO and/or FERC as part of the IOUs’ transmission rate cases.
Balancing the State’s build-out goals with affordability. While the author and supporters are rightfully concerned about the need to ensure the transmission and interconnection delays are addressed, there are valid concerns as to the limitations to effectively legislate the needed build-out. Much of the transmission and interconnection challenge rests with multiple parties, including the management of the interconnection queue at the CAISO, land rights, financing, permitting, and component availability which can all affect the delays to build projects. While electric IOUs and the CPUC are reporting information about transmission projects, as required by SB 1174 (Hertzberg, Chapter 758, Statutes of 2022), the electric IOUs contend the information is still very focused on them and not enough information about the generators and other issues outside the IOUs’ control. The proponents cited examples where the costs grew five-fold for a project which led to the electric IOU pivoting away from it after it was approved in the TPP. This seems reasonable, as a least-regrets approach is still necessary to protect ratepayers from undue costs, even as the state moves towards its clean energy goals. In this regard, a reasonable amount of additional time for projects included in the TPP would seem to be more than a year. The author may wish to consider extending the timeline to two years from when a project is included in the TPP and permitting begins. Additionally, the opponents are valid in raising concerns about costs. The author may wish to consider whether a authorizing self-build might lead to unjust costs for ratepayers. Although this bill notes “good cause” as a reason the electric IOU may not meet the deadlines – the one year by when permitting must begin – the bill does not define “good cause.” The author and committee may wish to amend this bill to provide a definition for “good cause” that encompasses causes for delay that are substantially outside the control of the electric IOU.
Prior/Related Legislation
AB 2111 (Papan, 2026) requires various actions to better incorporate uncertainty and risk in resource portfolio planning to inform transmission planning. The bill requires the CEC and CPUC, in coordination with CAISO, on or before January 1, 2028, to incorporate specified requirements into an update to the Memorandum of Understanding (MOU) regarding transmission and resource planning adopted by the CEC, CPUC, and CAISO on December 23, 2022, and any related workplan. The bill is pending in the Senate Appropriations Committee.
AB 2369 (Rogers, 2025) requires the CPUC and CEC provide transmission-focused information to the CAISO to identify cost-effective opportunities to increase the reliability contribution or mitigate congestion of planned or existing energy-only resources through transmission capacity expansions. The bill is pending in this committee.
SB 1174 (Hertzberg, Chapter 758, Statutes of 2022) required large electrical corporations that are participating transmission owners to submit annual data on transmission project delays and their impact on RPS-eligible generation and storage, incorporated into the CPUC’s annual RPS Report.
SB 529 (Hertzberg, Chapter 357, Statutes of 2022) required the CPUC to update General Order 131-D to allow IOUs to use the Permit to Construct process or claim an exemption for modifications to existing transmission facilities above the 200 kV threshold, to reduce permitting timelines for upgrades to existing infrastructure.
SB 254 (Becker, Chapter 119, Statutes of 2025) among its provisions, established the Transmission Infrastructure Accelerator and required the Go-Biz Energy Unit, in coordination with specified entities, to develop a financing and development strategy for eligible transmission projects, select projects that may receive public financing, and take steps to accelerate transmission development. The bill also required the CPUC to direct each electrical corporation to retain an independent third-party auditor to review the utility’s practices for energizing new customers and planning for demand growth, to evaluate current and future energization performance, and to report to the CPUC on a biannual basis, and authorized the CPUC to require remedial actions to address deficiencies the auditor identifies.
AB 2779 (Petrie-Norris, Chapter 741, Statutes of 2024) required the CAISO, upon approval of each transmission plan, to report to the CPUC and the relevant policy committees of the Legislature any new use of grid-enhancing technology deemed reasonable in that plan, and the costs and efficiency savings associated with that technology.
SB 1006 (Padilla, Chapter 597, Statutes of 2024) required electrical corporations to evaluate the use of advanced conductors and grid-enhancing technologies to increase transmission capacity and to report those evaluations to the CAISO.
SB 319 (McGuire, Chapter 390, Statutes of 2023) required specified actions related to electric transmission planning, including: requires a review and update to a December 2022 MOU and related workplan among California energy agencies and CAISO the development of an electrical transmission infrastructure guidebook; and a report to the Legislature regarding the status of transmission projects.
AB 50 (Wood, Chapter 317, Statutes of 2023) established interim timelines for large electrical corporations to energize customers following a commitment to serve, entitled customers to a bill credit for missed dates, and directed the CPUC to set criteria for timely service.
SB 410 (Becker, Chapter 394, Statutes of 2023) established the Powering Up Californians Act, which required the CPUC to establish reasonable average and maximum target energization time periods, a process for customers to report delays, remedial actions to meet the targets, and independent third-party assessment of each utility’s energization performance.
SB 887 (Becker, Chapter 358, Statutes of 2022) among its provisions, required the CPUC, in consultation with the CEC and the CARB, to provide transmission-focused guidance to the CAISO about resource portfolios of expected future renewable energy resources and zero-carbon resources to allow the CAISO to identify and approve transmission facilities needed to allow for full deliverability of those resources to load centers.
SB 100 (De León, Chapter 312, Statutes of 2018) established the 100 Percent Clean Energy Act of 2018, which increased the RPS requirement from 50% by 2030 to 60% and established a state policy that eligible renewable and zero-carbon resources supply 100% of retail electricity sales by December 31, 2045.
SB 350 (De León, Chapter 547, Statutes of 2015) established the Clean Energy and Pollution Reduction Act of 2015, which increased the RPS requirement from 33% to 50% by 2030 and created the integrated resource plan process at the CPUC to ensure long-term electricity planning aligns with the state’s GHG reduction targets while maintaining reliability and controlling costs.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
American Clean Power- California (Co-Sponsor)
Union of Concerned Scientists (Co-Sponsor)
Advanced Energy United
California Energy Storage Alliance
California Environmental Voters
California Wind Energy Association
Ceres, INC.
EDF Power Solutions
ENGIE North America
Environmental Defense Fund
Fluence Energy Systems
Independent Energy Producers Association
Large-Scale Solar Association
Natural Resources Defense Council
Ormat
Sierra Club California
Solar Energy Industries Association
OPPOSITION:
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison
ARGUMENTS IN SUPPORT: According to a coalition of organizations, including the co-sponsors of this bill and 14 other organizations listed above:
…California has set an ambitious goal to decarbonize its power grid by 2045. Realizing this goal depends on our ability to connect new clean power generation quickly and affordably. …Unfortunately, the IOUs are falling behind on those upgrades, delaying the addition of new power to the grid. …AB 2493 will help stabilize electricity prices and keep California’s grid reliable by requiring the large IOUs to connect new clean energy projects faster. First, AB 2493 sets a deadline for the larger IOUs to initiate permitting for major grid upgrades. Second, the bill requires an independent auditor to assess the root causes of interconnection upgrades delays and report findings to the CPUC. …An independent audit will provide the rigorous, consistent data that state regulators need to understand why projects are falling behind and what remedies will be most effective. Third, AB 2493 requires the large IOUs to develop solutions aligned with the auditor’s findings, including facilities advanced equipment procurement to mitigate supply chain constraints, expanding opportunities for entities other than the large IOUs to complete certain upgrades, and implementing a prioritization framework to fast-track upgrades that affect 100 MW or more of clean energy capacity. Finally, the bill directs the CPUC to evaluate the large IOUs’ progress in addressing interconnection delays in their rate requests and cost of capital applications.
ARGUMENTS IN OPPOSITION: According to PG&E and SCE:
AB 2493 would not address the primary drivers of delays identified in numerous publications and discussed at length in the Assembly Utilities Hearing held on February 18th. This include delays related to land rights, procurement lead times, permitting timelines, and customer-driven project design changes. Instead, AB 2493 would (1) create jurisdictional conflicts and competing compliance obligations for utilities by directing corrective actions that may be inconsistent with FERC-jurisdictional requirements and CAISO planning and cost parameters; (2) duplicative existing CPUC and CAISO oversight and reporting frameworks, including the CPUC’s Transmission Project Review Process under Resolution E-5252; (3) divert specialized engineering and interconnection staff away from completing studies and executing network upgrades; (4) increase costs for customers without clear, reasonable cost recovery parameters; (5) raise security concerns by requiring public posting of audit reports that could include sensitive critical infrastructure information; and (6) focus on utilities without addressing end-to-end contributors to delay across all responsible parties (utilities, manufacturers, land-owners, developers, and federal, state & local agencies).
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 2493
Author:(Petrie-Norris)
As Amended Ver:April 13, 2026
Majority vote
SUMMARY
Requires the California Public Utilities Commission (CPUC) to require each large electrical corporation to retain an independent third-party auditor to review certain transmission-and interconnection-related submissions made by a large electrical corporation (also known as an investor-owned utility (IOU).
Major Provisions
- Specifies the auditor is to review (1) the IOU′s progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the California Independent System Operator (CAISO), (2) the IOU′s compliance with requirements—created by this bill—that the IOU make specified progress on initiating permitting of approved electricity transmission projects, and (3) the IOU′s compliance with any remedial actions ordered by the CPUC.
- Requires the auditor to report to the CPUC annually and requires the CPUC, within 90 days of receiving the auditor′s report to issue a resolution directing an IOU to take remedial actions, as specified, to address any and all deficiencies identified by the auditor.
- Specifies that the IOU′s record of compliance with any such remedial actions ordered by the CPUC shall be admissible evidence and considered by the CPUC in any decision approving a rate or cost of capital application.
COMMENTS
Delays in Transmission and Interconnection. California continues to add significant amounts of clean energy generation and storage, but many projects remain dependent on transmission and interconnection upgrades before they can come online. Recent CPUC and CAISO findings indicate that transmission and interconnection delays remain prevalent, with many projects delayed beyond their original in-service dates.
Interconnection Backlogs and Queue Reforms. CAISO has adopted reforms intended to reduce interconnection backlogs and prioritize commercially viable projects. However, those reforms generally do not address delays that occur after studies are completed, including utility permitting and construction of required transmission upgrades.
Transmission Planning and Permitting. CAISO′s annual Transmission Planning Process (TPP) identifies transmission projects needed to maintain grid reliability, support state policy goals, and, where appropriate, reduce transmission congestion and integrate new resources. Utilities proposing new transmission facilities are generally required to obtain CPUC approval under existing permitting requirements, including environmental review under California Environmental Quality Act (CEQA). Recent CPUC findings indicate that utilities often take several years between transmission project approval and initiation of CPUC permitting applications.
Oversight Requirements. AB 2493 would require large electrical corporations to initiate permitting for certain transmission upgrades within specified timelines and retain independent third-party auditors to review interconnection and transmission related submissions, assess upgrade progress, and evaluate compliance with CPUC ordered remedial actions. The bill builds on oversight structures previously adopted for customer energization delays under SB 410 (Becker, 2023), AB 50 (Wood, 2023), and SB 254 (Becker, 2025).
Independent Verification and Accountability. Existing CPUC reporting requirements rely largely on utility submitted information regarding transmission project status and delays. This bill would add independent third-party verification of transmission and interconnection related reporting and require the CPUC to issue resolutions directing corrective actions in response to identified deficiencies. In addition, the bill would also allow repeated delays to be considered in proceedings related to utility cost recovery and authorized returns.
According to the Author
According to the author, ″Federal clean energy tax credits worth billions of dollars to California ratepayers are on the verge of expiring, and the single greatest obstacle to capturing those savings is the failure of our largest utilities to complete the grid upgrades needed to connect new clean energy projects. The CPUC′s own data shows that nearly two-thirds of these transmission upgrades are delayed, with some languishing for over a decade. AB 2493 creates the independent oversight and enforceable accountability mechanisms needed to break through these delays before it is too late.″
Arguments in Support
AB 2493 is supported by clean energy trade associations, environmental organizations, and clean energy developers who contend that delays in transmission and interconnection upgrades are slowing the development of new clean energy resources and increasing electricity system costs. Supporters further argue that the bill would improve oversight and accountability related to transmission upgrade delays, help bring new clean energy resources online more quickly, support electric reliability, and help reduce upward pressure on electricity rates.
Arguments in Opposition
AB 2493 is opposed by IOUs, which contend that the bill is unnecessary given the CPUC′s existing authority and could increase costs, create implementation challenges, and raise safety, reliability, and jurisdictional concerns. They also contend that energization and interconnection delays are often influenced by factors outside utility control, including customer driven redesigns, permitting, procurement lead times, and right of way acquisition, and therefore should not be addressed solely through utility focused requirements.
FISCAL COMMENTS
According to the Assembly Committee on Appropriations, this bill would create significant new workload for the CPUC related to coordinating with auditors, reviewing audit reports, ordering remedial actions, and conducting enforcement activities, as necessary. The CPUC estimates annual costs of approximately $735,000 from the Public Utilities Commission Utilities Reimbursement Account to support two analyst positions, one attorney position, and associated training and travel costs.
VOTES
ASM UTILITIES AND ENERGY: 14-1-3
YES: Petrie-Norris, Boerner, Calderon, Davies, Mark González, Harabedian, Hart, Irwin, Kalra, Papan, Rogers, Schiavo, Schultz, Zbur
NO: Ta
ABS, ABST OR NV: Patterson, Chen, Wallis
ASM APPROPRIATIONS: 11-3-1
YES: Wicks, Aguiar-Curry, Calderon, Caloza, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache
NO: Dixon, Ta, Tangipa
ABS, ABST OR NV: Hoover
UPDATED
VERSION: April 13, 2026
CONSULTANT: Lina V. Malova / U. & E. / (916) 319-2083 FN: 0002711
Date of Hearing: May 6, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 2493
Author:(Petrie-Norris) – As Amended Ver:April 13, 2026
Policy Committee: | Utilities and Energy | Vote: | 14 - 1 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill, among other things, directs the California Public Utilities Commission (CPUC) to require each large electrical corporation (also known as an investor-owned utility (IOU)) to retain an independent third-party auditor, selected and approved by the CPUC in consultation with the Public Advocate’s Office (PAO), to review the large electrical corporation’s electrical transmission and interconnection submissions to the CPUC.
The bill specifies the auditor is to review (1) the IOU’s progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the California Independent System Operator (CAISO), (2) the IOU’s compliance with requirements—created by this bill—that the IOU make specified progress on initiating permitting of approved electricity transmission projects, and (3) the IOU’s compliance with any remedial actions ordered by the CPUC.
The bill requires the auditor to report to the CPUC annually and requires the CPUC, within 90 days of receiving the auditor’s report to issue a resolution directing an IOU to take remedial actions, as specified, to address any and all deficiencies identified by the auditor. The bill also specifies that the IOU’s record of compliance with any such remedial actions ordered by the CPUC shall be admissible evidence and considered by the CPUC in any decision approving a rate or cost of capital application.
FISCAL EFFECT:
This bill creates significant new workload for the CPUC to coordinate with auditors, review auditor reports, order IOUs to take remedial actions and conduct enforcement actions, as necessary.
The CPUC contends this workload will cost it $735,000 annually to fund two analysist positions ($238,000 annually each), one attorney ($259,000 annually) and $40,000 annually for training and travel costs (Public Utilities Commission Utilities Reimbursement Account).
COMMENTS:
California has ambitious clean energy goals. Achievement of those goals requires the continued development of historically large amounts of clean energy resources. However, the volume of proposed clean energy projects and, in particular, the transmission projects that tie together sources of clean energy from what are oftentimes remote centers of demand, have challenged the ability of industry, regulated utilities and regulators alike to plan, permit and build the necessary electricity infrastructure.
The author decries the effect of these delays on the state’s ability to meet its clean energy goals, as well as the potential to forgo federal monies available to the state now. According to the author:
Federal clean energy tax credits worth billions of dollars to California ratepayers are on the verge of expiring, and the single greatest obstacle to capturing those savings is the failure of our largest utilities to complete the grid upgrades needed to connect new clean energy projects. The CPUC’s own data shows that nearly two-thirds of these transmission upgrades are delayed, with some languishing for over a decade. AB 2493 creates the independent oversight and enforceable accountability mechanisms needed to break through these delays before it is too late.
The bill is supported by a coalition of industry and environmental organizations, such as the Solar Energy Industries Association and the Natural Resources Defense Council, which collectively write:
On behalf of California’s leading clean energy trade associations, advocacy organizations, and developers, we write in strong support of AB 2493, which would hold California’s large investorowned utilities (IOUs) accountable for widespread, costly delays in upgrading grid equipment needed to connect clean energy to the grid. This bill will help make electricity more affordable and reliable in California while advancing the state’s clean energy and climate goals.
This bill is opposed by the IOUs. For example, San Diego Gas and Electric summarizes the bill as:
unnecessary given the CPUC’s existing authority, will likely increase costs for customers, and raises serious safety, reliability, and jurisdictional concerns. Most importantly, it is unaligned with the Legislature’s own stated priority of easing, rather than adding to, the financial burden on IOU ratepayers.
Similarly, Pacific Gas and Electric writes:
AB 2493 focuses exclusively on utility actions, yet interconnection timelines are often affected by customer driven redesigns, multijurisdictional permitting, procurement lead times, and right-of-way acquisition. A balanced approach should address end-to-end drivers of delay across all responsible parties rather than creating an electrical corporation only audit and remedial framework.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: April 8, 2026
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
ABPCA Bill Id:AB 2493 (
Author:Petrie-Norris) – As Amended Ver:March 26, 2026
SUBJECT: Electrical corporations: interconnection: transmission: permitting: auditor
SUMMARY: Requires the California Public Utilities Commission (CPUC) to require each large electrical corporation to retain an independent third-party auditor to review certain transmission- and interconnection-related submissions made by a large electrical corporation.
Specifically, this bill:
- Requires, beginning January 1, 2027, the CPUC to require each large electrical corporation to retain an independent third-party auditor to review the large electrical corporation’s submissions pursuant to commission Resolution E-5252 and subdivision (g) of Section 913.4, the large electrical corporation’s progress on completing network upgrades following approval in a generator interconnection agreement or transmission plan approved by the Independent System Operator, and the large electrical corporation’s compliance with any remedial actions ordered by the CPUC.
- Requires the CPUC to consult with the Public Advocates Office of the CPUC in selecting the auditor and to ensure that the auditor does not have a conflict of interest due to other work, contracts, or business relationships with the large electrical corporation.
- Requires the auditor to report to the CPUC on an annual basis and requires the CPUC to post the auditor’s reports on its internet website and incorporate those reports into the CPUC’s annual reporting requirements.
- Provides that within 90 days of receiving the auditor’s report, the CPUC shall issue a resolution directing a large electrical corporation to take remedial actions to address any and all deficiencies identified by the auditor. Remedial actions may include, but are not limited to, the following:
- Reallocating staff or capital resources to complete high-priority upgrades.
- Facilitating advanced procurement of equipment or equipment sharing with other electrical corporations to address delays caused by supply chain constraints.
- Implementing interim deliverability or temporary generator interconnection solutions
- Enabling generators to procure equipment on behalf of the large electrical corporation.
- Enabling self-build options by generators or transmission solutions developed by another electrical corporation.
- Expediting engineering, design, permitting, and other preconstruction work for high-priority upgrades following approval in a generator interconnection agreement or a transmission plan approved by the CAISO.
- Defines:
- “Self-build options” to include, but not limited to, the permitting, design, procurement, construction, or commissioning of transmission, distribution, or interconnection facilities by an entity other than the large electrical corporation.
- “High-priority upgrades” as transmission, distribution, or interconnection facilities affecting the interconnection or deliverability of at least 100 megawatts of generating or storage capacity.
- Requires within one year following the adoption of each transmission plan produced by the CAISO through the transmission planning process, or a successor process, each large electrical corporation that is assigned to construct a project that requires approval by the CPUC shall initiate permitting for the project by filing an application or other notice, as applicable, pursuant to General Order 131-E.
- Requires within one year following the execution of a generator interconnection agreement, each large electrical corporation that is obligated to construct a project that requires approval by the CPUC shall initiate permitting for the project by filing an application or other notice, as applicable, pursuant to General Order 131-E.
- Authorizes a large electrical corporation to request an extension of the filing deadlines by demonstrating good cause in a written notice to the CPUC. The notice shall be served at least 30 days before the filing deadline and specify the actions the large electrical corporation is undertaking to resolve the principal causes of delay identified in the notice.
- Provides that if a large electrical corporation fails to adhere to the timelines or to make a timely extension request, the CPUC is required to take appropriate enforcement action pursuant to Section 701 of the Public Utilities Code.
- Requires the CPUC to consider a large electrical corporation’s record of compliance with remedial actions ordered as admissible evidence in any proceeding to approve rates or cost of capital under Section 451 of the Public Utilities Code.
FISCAL EFFECT: Unknown. This bill is keyed fiscal and will be referred to the Committee on Appropriations.
BACKGROUND:
Megawatts in Waiting – California has made significant progress in developing clean energy resources over the past several years. Since January 2020, nearly 400 clean generation and storage projects have been added or interconnected within the CAISO footprint, totaling approximately 27 GW of new nameplate capacity.[1] In 2024 alone, the state added nearly 7 GW of clean energy capacity, predominantly solar paired with battery storage, representing the largest single-year increase in clean capacity in California’s history.[2] Looking ahead, the CPUC has identified a need for more than 14.8 GW of additional clean resources to come online by 2026 to meet projected load growth and maintain system reliability. However, a significant and growing number of projects remain in the interconnection queue and are dependent on transmission and distribution upgrades that must be designed, permitted, and constructed before they can come online. Interconnection study timelines, the extent of required upgrades, and construction lead times can delay projects from reaching commercial operation even after they have secured permits and contracts.
The CAISO Interconnection Process – To secure financing, developers also need to clearly understand when they can interconnect and whether the electricity they generate can reliably reach customers. Interconnection projects are divided into two main queues: the Distribution Interconnection Queue, managed by individual utilities, and the Transmission Interconnection Queue, overseen by the CAISO. The queue a project enters is determined by its voltage level; specifically, projects exceeding a threshold of 20 MW set by the local utility are directed to the transmission queue, where CAISO manages the interconnection process. The interconnection process begins when a developer submits an interconnection request to the relevant utility or the CAISO. This request includes several elements, such as the selection of a specific point of interconnection and an initial determination of whether sufficient transmission capacity exists to reliably deliver power from that location. Once deemed complete, the interconnection request is entered into the interconnection queue for studies conducted under the CAISO tariff, which governs the requirements for interconnection, operation, and metering.
As part of this process, interconnection studies are coordinated with CAISO’s Transmission Planning Process (TPP),[3] which identifies network upgrades needed to integrate new generation and ensure long-term system reliability. Where upgrades are required, the interconnection process specifies the necessary facilities and estimates associated costs in accordance with the CAISO tariff, while coordinating construction schedules with the project. After a resource completes the required study phases, an interconnection agreement is signed. The resource must then be modeled in CAISO’s market systems and install and test the required metering before it may participate in the wholesale electricity market.
The Interconnection Challenge – In recent years, the volume of projects entering this process has increased significantly, exceeding the pace at which studies and required upgrades can be completed. Between 2012 and 2020, CAISO received an average of 113 interconnection requests per year.[4] That pattern significantly changed, beginning in 2021, as state procurement directives, resource adequacy requirements, and clean-energy targets spurred a sharp increase in interconnection demand. This surge also coincided with the passage of the IRA in August 2022, which significantly expanded and extended federal tax incentives for clean energy generation and energy storage. In the 2022 interconnection application window alone, CAISO received approximately 373 requests, more than triple historical averages.[5]
As a result, CAISO was required to evaluate an unusually large number of interconnection requests simultaneously, which includes a substantial volume of energy storage and hybrid storage-plus-generation projects.[6] As study results developed, the scope and cost of required network upgrades were refined over time rather than resolved within a single study cycle.[7] As a result, developers faced longer study timelines, changes in preliminary cost estimates, and uncertainty regarding the scope, cost, and timing of required transmission upgrades, contributing in some cases to withdrawal from the interconnection queue or deferral to later study clusters.[8]
Following completion of Cluster 14, CAISO implemented more reforms through its Interconnection Process Enhancements (IPE), approved by FERC in September 2024. These reforms modified how projects enter and advance through the queue by introducing screening and prioritization criteria based on commercial readiness, project viability, and system need, and by limiting the number of projects that proceed into study. In June 2025, CAISO reported that 145 projects advanced out of 541 submitted in Cluster 15, reflecting a more selective intake process intended to reduce backlog and improve study timelines.[9] While these reforms are intended to improve study timelines, they do not address delays that occur after studies are completed, including the time required for utilities to initiate permitting and construct required network upgrades, which can extend project timelines even after interconnection is complete.
Transmission Development Process – The CAISO leads statewide transmission planning through its annual Transmission Planning Process (TPP), which identifies needed transmission projects to maintain system reliability and support state policy goals. According to the CEC, projects approved through the TPP currently account for approximately 22% of California’s transmission projects, with the remainder consisting primarily of utility self-initiated repair and replacement work that is not reviewed through the TPP. Utilities proposing the construction of new transmission facilities are generally required to obtain approval from the CPUC pursuant to Public Utilities Code Section 1001. The CPUC reviews applications through established permitting processes, including environmental review under the California Environmental Quality Act (CEQA).
For projects approved through the TPP, transmission facilities are typically financed, constructed, and owned by the incumbent utility within its service territory. Projects above 200 kilovolts, as well as those that cross multiple service territories, may be subject to competitive solicitation, allowing independent developers to build and own transmission facilities. Both utilities and third-party developers recover capital and ongoing maintenance costs through the Transmission Access Charge.
As discussed in this committee and reflected in multiple records, transmission capacity will need to at least double by 2045 to interconnect new renewable generation and meet California’s clean energy goals. However, the transmission development process is lengthy and complex, and major projects can take more than a decade to move from initial planning, permitting and to construction and completion.
GO-131 Reforms. General Order 131 was originally adopted by the CPUC in 1970 and last substantially updated in 1995 as GO 131-D, establishing the rules for permitting and constructing electric transmission facilities. Since then, California’s electricity system has changed significantly, with increases in renewable generation, electrification, and the need for transmission to connect new resources. In January 2025, the CPUC adopted GO 131-E to update these requirements and implement SB 529 Hertzberg, Chapter 357, Statutes of 2022. The order revises procedures for obtaining a Permit to Construct (PTC) or claiming an exemption, while continuing to require environmental review under the California Environmental Quality Act (CEQA). It allows applicants to submit applicant-prepared draft CEQA documents with their applications, requires pre-filing consultation with CPUC staff prior to submitting an application, and establishes a pilot program to evaluate CEQA review timelines for certain transmission projects. For projects identified in the CAISO transmission planning process, the CPUC may rely on CAISO’s determination of need as part of its review process.
Recent CPUC findings indicate that transmission development timelines remain extended despite these process updates. For transmission projects approved through the CAISO transmission planning process, utilities take, on average, approximately three years between project approval and initiation of a permitting application at the CPUC, with the pre-application phase often exceeding the duration of the CPUC’s permitting review. CPUC reporting also shows that some approved projects have not yet entered the permitting process several years after approval.[10] While GO 131-E updates the permitting process and may improve coordination and review timelines, it does not establish a requirement for when utilities must initiate permitting following project approval.
COMMENTS:
- Author’s Statement. According to the author, “Federal clean energy tax credits worth billions of dollars to California ratepayers are on the verge of expiring, and the single greatest obstacle to capturing those savings is the failure of our largest utilities to complete the grid upgrades needed to connect new clean energy projects. The CPUC’s own data shows that nearly two-thirds of these transmission upgrades are delayed, with some languishing for over a decade. AB 2493 creates the independent oversight and enforceable accountability mechanisms needed to break through these delays before it is too late.”
- Delays. Delays. Delays. AB 2493 addresses delays in the transmission and interconnection -related upgrades needed to bring new clean energy resources online. California’s large investor-owned utilities, Pacific Gas & Electric (PG&E), Southern California Edison (SCE), and San Diego Gas & Electric (SDG&E), are responsible for constructing these upgrades, which must be completed before new generation and storage projects can connect to the grid. When these upgrades are delayed, dependent generation and storage resources are unable to interconnect and supply electricity to the grid.
Recent findings from the CPUC[11] indicate that transmission project delays remain prevalent. In 2025, 328 of 513 in-development projects (64%) were delayed beyond their original in-service dates, including 277 of 440 projects (63%) at PG&E and 51 of 73 projects (70%) at SCE. Delay reasons across PG&E and SCE include: a) bundling dependencies (117 projects) where work on one project cannot proceed until related transmission upgrades are completed; b) project design (98), including redesigns and additional engineering work beyond the original scope; c) financing (48); and d) permitting (45).[12] Notably, SDG&E’s data were not included in the CPUC’s assessment for the second consecutive year due to data limitations, including challenges distinguishing between original and current in-service dates and inconsistencies in how the reporting scope was interpreted.[13]
However, these data have limitations. SB 1174 (Hertzberg, Chapter 367, Statutes of 2022) requires the CPUC to collect information on transmission projects needed to support RPS procurement and assess their status. The CPUC uses this information to identify delayed projects and evaluate systemwide trends. But the reporting relies on utility-submitted data and does not include independent verification of those submissions. AB 2493 addresses this directly by requiring large electrical corporations to retain independent third-party auditors to review interconnection and transmission-related submissions, providing the verification that current reporting lacks.
- Federal Changes. Federal policy is shortening project development timelines. The One Big Beautiful Bill Act, signed on July 4, 2025, phases out federal clean energy tax credits for new solar and wind projects. These projects now face a shorter timeline to qualify for these incentives. Projects that do not meet the eligibility deadlines could forgo more than $10 billion in federal investment tax credits that would otherwise help lower project costs. Given the multi-year timelines required to plan, permit, and construct transmission and interconnection upgrades, delays at early stages may affect whether projects are able to come online in time to qualify. Therefore, AB 2493 requires permitting to begin on a defined timeline and requires independent verification of project status to help address early delays and reduce the risk of higher project costs.
- Setting the Clock. There is currently no timeline requirement for large electrical corporations to begin transmission upgrades following approval. Therefore, utilities may take several years to initiate permitting, with averages of roughly three years between approval and filing an application with the CPUC. In some cases, projects approved more than a decade ago have not yet been filed, and the pre-application phase can exceed the duration of the CPUC permitting process itself. AB 2493 addresses this gap by requiring utilities to initiate permitting within one year of project approval or execution of an interconnection agreement. The bill additionally allows utilities to request additional time for good cause, including delays outside their control. Recent updates to General Order 131-E, which allow utilities to submit draft CEQA documents in place of a complete environmental assessment, may further support compliance with this timeline.
- It’s Been Done. Now Do it Again. SB 254 (Becker, Chapter 119, Statutes of 2025) established independent oversight of large electrical corporations by requiring third-party auditors to evaluate utility practices related to energizing new customers, including energization performance, workforce capacity, and planning for demand growth. Auditors report to the CPUC on a biannual basis, and the CPUC may require corrective actions to address identified deficiencies. These efforts build on earlier legislative actions to address delays in energizing new customers. AB 50 (Wood, Chapter 217, Statutes of 2023) and SB 410 (Becker, Chapter 394, Statutes of 2023) required the CPUC to establish timelines for connecting new customers and increasing service capacity. In response, the CPUC adopted a decision in September 2024 requiring large electrical corporations to plan and prioritize energization work to meet those timelines, report when timelines are exceeded, and take corrective actions.
AB 2493 extends this approach to interconnection and transmission, where CPUC assessments show delays in completing network upgrades needed to bring new generation online. Beginning January 1, 2027, the bill would require large electrical corporations to retain independent third-party auditors to review interconnection related submissions, assess progress on completing network upgrades approved through interconnection agreements or transmission plans, and evaluate compliance with CPUC ordered remedial actions. Auditors would report annually, and the CPUC would be required to issue a resolution within 90 days directing actions to address any deficiencies identified. As such, the measure builds on existing oversight tools from distribution level energization to transmission and interconnection, where project delays have also been persistent.
- Delays Catch Up. Under existing law, utilities face limited financial consequences for chronic interconnection delays, and existing oversight does not consistently carry those delays into ratemaking outcomes. Utilities provide status updates on interconnection and transmission projects, but those updates are not always directly considered in proceedings that determine authorized returns and cost recovery. As a result, repeated delays may be identified, but do not necessarily affect those determinations. Section 769.4(c) provides that a utility’s interconnection compliance record may be considered by the CPUC in rate cases and cost of capital proceedings. This allows the CPUC to consider a utility’s record on these delays when evaluating the reasonableness of costs and setting authorized returns. While AB 2493 does not impose automatic penalties, it ensures that repeated delays are not evaluated in isolation but can be considered in the same proceedings that determine authorized returns and cost recovery.
- Independent Verification. Resolution E-5252 requires utilities to report on the status of transmission projects approved through the CAISO’s TPP assigned to the utilities for development. These reports include schedule updates and explanations for delays, allowing the CPUC to track project status and delays over time. However, this reporting is primarily focused on transmission planning projects and does not include independent verification. AB 2493 expands oversight by requiring independent third-party audits of transmission and interconnection projects, providing an external assessment of project status and delays.
- Opposition. This bill is opposed by PG&E and SCE, who raise some of the following concerns:
Duplicative Reporting
PG&E and SCE report that CPUC’s Resolution E-5252 (Transmission Project Review Process) already provides oversight, including the ability for the CPUC to request additional information and review utility submissions. Resolution E-5252 requires utilities to report on the status of transmission projects approved through the CAISO Transmission Planning Process and assigned for development, including schedule updates and explanations for delays. These reports allow the CPUC to track project status over time. However, the reporting is based on utility-submitted information and does not provide for ongoing independent verification.
The utilities also note that they provide regular updates through established CAISO and CPUC coordination forums, including monthly interconnection reporting and periodic transmission updates. However, these processes support coordination and information sharing across agencies and stakeholders.
In addition, the period between project approval and the start of permitting can extend for multiple years and is not subject to a defined timeline. While utilities provide explanations for delays, those explanations are not always presented in a standardized manner across projects, making it difficult to assess patterns of delay.
AB 2493 takes a more targeted approach by requiring an independent third-party review to supplement, rather than replace existing reporting. This allows for independent review of project status and reported delays, particularly for projects expected to move forward.
Increases Ratepayer Costs
PG&E and SCE argue that this bill would impose a new recurring cost for an auditor, create additional administrative requirements, and raise affordability concerns, particularly if costs are not recoverable. They suggest that, if independent auditing is needed, it should be funded through existing public resources or other means. However, the cost concern should be considered alongside the cost of delay. When projects are delayed, costs increase as timelines extend, and those impacts ultimately fall on ratepayers. This bill does not add construction costs. Instead, it is intended to identify delays earlier, when they can still be addressed and ultimately reduce project costs.
Federal-State Conflict.
AB 2493 requires utilities to initiate permitting within one year of both CAISO transmission plan approval and execution of a generator interconnection agreement. It remains unclear whether these requirements create a conflict with federal jurisdiction, particularly where interconnection timelines are governed by FERC-approved processes.
Bill targets utilities and ignores other major sources of delay.
PG&E and SCE argue that AB 2493 focuses exclusively on utility actions, while interconnection timelines are also affected by customer-driven redesigns, multijurisdictional permitting, procurement lead times, and right-of-way acquisition. They contend that a more balanced approach should address delays across all responsible parties, rather than focusing on utilities alone.
Interconnection timelines can be affected by factors beyond the utility’s control, including permitting, supply chain constraints, and customer-driven changes. These issues are the subject of ongoing legislative and regulatory efforts. This committee has held informational hearings and conducted oversight on permitting timelines, CAISO transmission planning and interconnection processes, and coordination gaps among the CPUC, CEC, and CAISO.
AB 2493 does not attribute delays only to utilities; it focuses on utility-managed steps in the development process, including how projects move after delays. Addressing these steps does not exclude other sources of delay. Rather, it complements broader efforts to improve project timelines in general.
- Audit Scope. This bill requires an independent third-party audit of utility transmission and interconnection projects, including reporting under Resolution E-5252 and Section 913.4(g), which requires utilities to report on the status and timelines of interconnection-related network upgrades, as well as tracking progress on network upgrades following approval. However, these provisions are primarily focused on project status and do not verify compliance with the defined timeframe for initiating permitting in subdivision (a). As such, the committee recommends including a provision that ensures the audit evaluates whether utilities meet the one year to initiate permitting requirement as provided in subdivision (a) of this measure.
- Clarifying Amendments. This legislation contains some provisions that may benefit from additional clarity. As such, the committee recommends other technical amendments that are clarifying in nature.
- Related legislation.
AB 2111 (Papan) would require the California Public Utilities Commission (CPUC) to incorporate specified requirements into its integrated resource planning and transmission planning processes, including evaluating resource portfolios across a range of plausible future conditions and assessing system needs under uncertainty. Status: Assembly Committee on Utilities and Energy
AB 2369 (Rogers) would require the CPUC and the CEC, as part of their transmission planning projections, to identify cost-effective opportunities to increase the reliability contribution or mitigate congestion of planned or existing energy-only resources through transmission capacity expansions. Status: Assembly Committee on Utilities and Energy
- Prior Legislation.
SB 254 (Becker) Establishes the Transmission Infrastructure Financing and Development Program to support the financing and development of transmission projects.
Status: Chapter 636, Statutes of 2025
SB 836 (Rubio) would have required state entities to take actions to improve coordination of transmission planning and permitting processes among the CPUC, the CEC, and the CAISO. Status: Senate Appropriations
AB 3238 (Garcia) directed the CPUC, in coordination with the CAISO and other relevant agencies, to evaluate and identify opportunities to accelerate the development of transmission infrastructure needed to support the state’s clean energy goals, including by assessing planning, permitting, and cost allocation barriers and recommending strategies to streamline project development and deployment. Status: Chapter 378, Statutes of 2024
AB 551 (Bennett, 2023) authorizes the CPUC to adopt guidelines at a publicly noticed meeting to carry out its review of applications for the construction of electrical transmission facilities and makes other changes to help reduce delays in processing these requests. Status: Chapter 299, Statutes of 2024.
SB 420 (Becker, 2023) removes the requirement on new electrical transmission facility projects less than 138 kilovolts (kV) proposed by the state’s six largest investor-owned utilities (IOUs)1 from a determination of need from the CPUC before construction. These new projects must either be located on previously disturbed land, located in an urbanized area or be part of a project that has undergone a California Environmental Quality Act (CEQA) review. Excludes from eligibility projects that are located in wetlands, any un-remediated hazardous waste site, or critical habitat, as specified. Status: Vetoed by the Governor
SB 319 (Dodd) requires the California Energy Commission (CEC), in coordination with the CPUC and the CAISO, to develop a transmission planning and permitting guidebook describing applicable processes and requirements. Status: Chapter 365, Statutes of 2023
AB 1373 (Garcia), among other things, requires the CPUC, in a proceeding when evaluating the issuance of a certificate of public convenience and necessity for a proposed transmission project, to establish a rebuttable presumption with regard to the need for the proposed transmission project in favor of an Independent System Operator governing board-approved need evaluation if specified requirements are met. Status: Chapter 367, Statutes of 2023.
SB 619 (Padilla, 2023) Authorizes an electrical corporation, at the time it files an application with the CPUC for a Certificate of Public Convenience and Necessity AB 941 Page 13 (CPCN) or Permit to Construct (PTC) for new construction of any electrical transmission facility 138 kilovolts (kV) or greater to, at the same time, submit an application for that facility to the CEC. Prohibits the CEC from considering the necessity for the electrical transmission facility. Status: Vetoed by the Governor
SB 529 (Hertzberg) directed the CPUC to revise General Order 131-D to authorize investor-owned utilities to use a streamlined Permit to Construct process for modifications to existing transmission facilities regardless of voltage level, with the intent of reducing permitting timelines for grid upgrades. Status: Chapter 357, Statutes of 2022
SB 887 (Becker, 2022) required the CPUC, on or before January 15, 2023, to request the CAISO to identify the highest priority transmission facilities anticipated to be needed to support the delivery of electricity from renewable energy resources or zero-carbon resources. Status: Chapter 358, Statutes of 2022
SB 1174 (Hertzberg) required large electrical corporations that are participating transmission owners to submit annual data on transmission project delays and their impact on RPS-eligible renewable generation and storage resources, incorporated into the CPUC’s annual RPS Report. Did not include an independent third-party review or an enforcement mechanism. Chapter 758, Status of 2022.
REGISTERED SUPPORT / OPPOSITION:
Support
Advanced Energy United
American Clean Power- California
California Energy Storage Alliance
California Environmental Voters
California Wind Energy Association
City of Pico Rivera
Edf Power Solutions
Engie North America
Environmental Defense Action Fund
Fluence
Independent Energy Producers Association
Large-scale Solar Association
Natural Resources Defense Council (NRDC)
Ormat
San Diego Community Power
Sierra Club California
Solar Energy Industries Association
Union of Concerned Scientists
Support If Amended
The Utility Reform Network (TURN)
Opposition
Pacific Gas and Electric Company and its Affiliated Entities
San Diego Gas and Electric Company
Southern California Edison
Analysis Prepared by: Lina V. Malova / U. & E. / (916) 319-2083
CPUC, Resource Tracking Data (Energy Division), December 2025 release, “Part 1: New MW Online – SB 100 Resources (In-CAISO),” tracking clean generation and storage resources added or interconnected since January 1, 2020; https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/summer-2021-reliability/tracking-energy-development ↑
Gavin Newsom, “New Data Shows California Is Adding More Clean Energy Capacity to the Grid Faster Than Ever Before,” Office of Governor Gavin Newsom, June 4, 2025, https://www.gov.ca.gov/2025/06/04/new-data-shows-california-is-adding-more-clean-energy-capacity-to-the-grid-faster-than-ever-before/ ↑
CAISO; “CAISO Interconnection Study”; http://www.caiso.com/planning/Pages/GeneratorInterconnection/InterconnectionStudy/Default.aspx ↑
California Independent System Operator, Decision on Cluster 14 Interconnection Procedures, presentation; July 15, 2021;slide 2, stating that “in the last decade, the ISO has received an annual average of 113 queue cluster interconnection requests,” https://www.caiso.com/documents/decision-cluster-14-interconnection-procedures-presentation-july-2021.pdf ↑
Marissa Evans, “As California Grid Interconnection Requests Triple, Analysts Assess CAISO’s Response,” Utility Dive, March 30, 2023, https://www.utilitydive.com/news/as-california-grid-interconnection-requests-triple-analysts-assess-caisos/642591/ ↑
California Independent System Operator, Memorandum; Decision on Cluster 14 Interconnection Procedures; July 7, 2021, https://www.caiso.com/Documents/Decision-Cluster-14-Interconnection-Procedures_Memo-July-2021.pdf ↑
California Independent System Operator, Decision on Cluster 14 Interconnection Procedures, presentation; July 15, 2021; slides 3–4, explaining that Phase I cost estimates are “advisory” and Phase II establishes cost caps for network upgrades; https://www.caiso.com/documents/decision-cluster-14-interconnection-procedures-presentation-july-2021.pdf ↑
California Independent System Operator, comments on Improvements to Generator Interconnection Procedures and Agreements, October 13, 2022, 23–24, stating that most interconnection customer withdrawals occur immediately prior to financial security posting deadlines, https://www.caiso.com/documents/oct-13-2022-comments-notice-proposedrulemaking-improvements-generatorinterconnectionprocedures-agreements-rm14-22.pdf ↑
California Public Utilities Commission, 2025 Renewables Portfolio Standard (RPS) Annual Report (including SB 1174 systemwide transmission assessment), at pp7, pp13–15 (documenting average pre-application timelines of approximately three years for transmission planning projects and identifying projects approved in earlier transmission planning cycles that have not yet filed CPCN or PTC applications) ↑
CPUC, 2025 California Renewables Portfolio Standard Annual Report; SB 1174 Assessment; pp. 84–112; November 2025; https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/office-of-governmental-affairs-division/reports/2025/2025-california-renewables-portfolio-standard-rps-annual-report.pdf ↑
Ibid., at pp. 89–91 (Table 40: Transmission Project Delay Reasons by PTO). ↑
Ibid., at pp. 86-87 ↑
Discussed in Hearing
Senate Floor
Assembly Floor
Senate Floor
Senate Standing Committee on Energy, Utilities and Communications
Assembly Floor
Assembly Standing Committee on Utilities and Energy
Bill Author
Bill Co-Author(s):