AB 2516: California Grid Manufacturing Initiative.
- Session Year: 2025-2026
- House: Assembly
- Latest Version Date: 2026-06-25
Current Status:
In Progress
(2026-08-13: In committee: Held under submission.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law establishes the Governors Office of Business and Economic Development (GO-Biz) within the Governors office and requires GO-Biz to serve the Governor as the lead entity for economic strategy and the marketing of California on issues relating to business development, private sector investment, and economic growth. Existing law creates within GO-Biz the Energy Unit to accelerate the planning, financing, and execution of critical energy infrastructure projects, as specified.
This bill would require the Energy Unit, in coordination with other specified state entities, to establish the California Grid Manufacturing Initiative. The bill would require the Energy Unit to identify and procure determine and provide appropriate forms of state assistance to address identified delays with critical electricity grid components, as defined, and to incentivize new or existing in-state manufacturing of critical electricity grid components. components, and to provide support to joint procurement initiatives.
This bill would require the Energy Unit to develop a process for each public utility, as defined, on or before January 1, 2028, and regularly thereafter, to submit a projection of its purchasing needs for critical electricity grid components for which the public utility has not entered into a purchase agreement and for which the public utility affirmatively seeks the assistance of the Energy Unit in coordinating resources and leveraging purchasing power. The bill would provide that, if the Energy Unit determines that centralized procurement is warranted for a critical electrical grid component, a participating public utility may, prior to the issuance of a solicitation by the Energy Unit for that component, submit to the Energy Unit the conditions under which the public utility commits to purchase those components from the initiative, as provided. Under the bill, if a procurement by the Energy Unit satisfies the conditions submitted by a public utility, the public utilitys commitment to purchase the component from the initiative would be binding, as provided. By imposing new duties on local publicly owned electric utilities, the bill would impose a state-mandated local program.This bill would require the Public Utilities Commission, as soon as practicable, and in consultation with the State Energy Resources Conservation and Development Commission and the Independent System Operator, to develop a process to identify critical electricity grid components and to assess the statewide need for critical electricity grid components for the next 10-year period. The bill would require the assessment to include identification of specific strategies to reduce delays and ratepayer costs associated with the procurement of critical electricity grid components. The bill would require the Public Utilities Commission to determine, for each critical electricity grid component, whether requiring electrical corporations to engage in the joint procurement of the critical electricity grid component would further the purposes of the bill, and if the commission makes that determination, and also determines that electrical corporations would benefit from the joint procurement, the bill would authorize the Public Utilities Commission to require electrical corporations to engage in a joint procurement to fulfill the projected purchasing needs of each participating electrical corporation for the critical electricity grid component, as provided.
This bill would require electrical corporations that are required to engaged in a joint procurement pursuant to the bill to, not more than 12 months following the imposition of the requirement, take certain actions, including engaging in a joint cooperative process for the sourcing and negotiation of joint purchase agreements for the purchase of critical electricity grid components.
This bill would authorize the Energy Unit to issue requests for proposals or other competitive solicitations to procure critical electricity grid components, as provided, and would authorize the Energy Unit to provide financial assistance to projects that establish or expand manufacturing capacity in California for electrical critical electricity grid components, as specified. The bill would also authorize the Energy Unit to enter into production joint ventures with qualified private suppliers, as provided, and to provide bond financing and other assistance.
The bill would authorize the Public Utilities Commission to authorize the recovery of costs incurred under the initiative only to the extent it determines those costs are just and reasonable, cost-effective, and aligned with state energy policy, as provided. To the extent the joint procurement results in costs below prevailing market prices for critical electricity grid components, the bill would require the commission to ensure that the difference is credited to ratepayers, as provided.
Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing certain requirements of the bill would be a crime, this bill would impose a state-mandated local program.
Existing law, the Bergeson-Peace Infrastructure and Economic Development Bank Act, establishes the California Infrastructure and Economic Development Bank (I-Bank) within GO-Biz and, among other things, authorizes the I-Bank to make loans, issue bonds, and provide financial assistance for various types of projects that qualify as economic development or public development facilities, as provided.
This bill would create the California Grid Manufacturing Initiative Revolving Fund in the State Treasury, and the Manufacturing Incentive Account and the Procurement Account within the revolving fund, Treasury for the purpose of providing financial assistance pursuant to the initiative. The bill would make the moneys in the revolving fund continuously appropriated for expenditure in accordance with the initiative. The bill would authorize the I-Bank, on behalf of the Energy Unit, to issue revenue bonds to finance procurement and manufacturing of critical electricity grid components, and would authorize the I-Bank to provide financial assistance, including financial assistance from the proceeds of the revenue bonds, to a participating party, as defined, in connection with the financing or refinancing of a project to establish or expand manufacturing capacity for critical electricity grid components. The bill would require the I-Bank to meet and confer with the Energy Unit for eligible projects and would provide that final authority to provide financial support to an eligible project resides with the Energy Unit. The bill would require the proceeds of the any bonds to be deposited into the respective accounts the revolving fund and used exclusively for the purposes of the initiative. By establishing a continuously appropriated fund, the bill would make an appropriation.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for specified reasons.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law establishes the Governors Office of Business and Economic Development (GO-Biz) within the Governors office and requires GO-Biz to serve the Governor as the lead entity for economic strategy and the marketing of California on issues relating to business development, private sector investment, and economic growth. Existing law creates within GO-Biz the Energy Unit to accelerate the planning, financing, and execution of critical energy infrastructure projects, as specified.
This bill would require the Energy Unit, in coordination with other specified state entities, to establish the California Grid Manufacturing Initiative. The bill would require the Energy Unit to serve as the states central entity for aggregating demand for critical electricity grid components, to coordinate the procurement of electricity grid components, identify and procure critical electricity grid components, as defined, and to incentivize new or existing in-state manufacturing of electricity grid components.
This bill would require the Energy Unit to develop a process for each public utility, as defined, on or before January 1, 2028 2028, and regularly thereafter, to submit a projection of its purchasing needs for critical electricity grid components for which the public utility has not entered into a purchase agreement. agreement and for which the public utility affirmatively seeks the assistance of the Energy Unit in coordinating resources and leveraging purchasing power. The bill would require the Energy Unit, based on the projections, to determine the statewide aggregate purchasing needs for critical electricity grid components, as specified. The bill would require a public utility that purchases electricity grid components identified pursuant to the bill to purchase those components from the initiative, except as provided. The bill would permit an electrical corporation, and require the Public Utilities Commission, to authorize the recovery of costs incurred by the electrical corporation in implementing the above-described requirements, and would authorize a local publicly owned electric utility to recover the costs incurred from the implementation of the above-described requirements from its ratepayers. provide that, if the Energy Unit determines that centralized procurement is warranted for a critical electrical grid component, a participating public utility may, prior to the issuance of a solicitation by the Energy Unit for that component, submit to the Energy Unit the conditions under which the public utility commits to purchase those components from the initiative, as provided. Under the bill, if a procurement by the Energy Unit satisfies the conditions submitted by a public utility, the public utilitys commitment to purchase the component from the initiative would be binding, as provided. By imposing new duties on local publicly owned electric utilities, the bill would impose a state-mandated local program.
Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.Because a violation of a commission action implementing the bills requirement regulating the procurement practices of electrical corporations would be a crime, this bill would impose a state-mandated local program.This bill would authorize the Energy Unit to issue requests for proposals or other competitive solicitations to procure critical electricity grid components, as provided. The bill would require the Energy Unit to identify any critical electricity grid components for which cost, supply constraints, or other limitations inhibit the states ability to achieve its energy goals, provided, and would authorize the Energy Unit to provide financial assistance to projects that establish or expand manufacturing capacity in California for those electrical grid components, as specified. The bill would also authorize the Energy Unit to enter into production joint ventures with qualified private suppliers, as provided, and to provide bond financing and other assistance.
The bill would authorize the Public Utilities Commission to authorize the recovery of costs incurred under the initiative only to the extent it determines those costs are just and reasonable, cost-effective, and aligned with state energy policy, as provided. To the extent the procurement results in costs below prevailing market prices for grid components, the bill would require the commission to ensure that the difference is credited to ratepayers, as provided.
Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing certain requirements of the bill would be a crime, this bill would impose a state-mandated local program.
Existing law, the Bergeson-Peace Infrastructure and Economic Development Bank Act, establishes the California Infrastructure and Economic Development Bank (I-Bank) within GO-Biz and, among other things, authorizes the I-Bank to make loans, issue bonds, and provide financial assistance for various types of projects that qualify as economic development or public development facilities, as provided.
This bill would create the California Grid Manufacturing Initiative Revolving Fund in the State Treasury, and the Manufacturing Incentive Account and the Procurement Account within the revolving fund, for the purpose of providing financial assistance pursuant to the initiative. The bill would make the moneys in the revolving fund continuously appropriated for expenditure in accordance with the initiative. The bill would authorize the I-Bank, on behalf of the Energy Unit, to issue revenue bonds to finance procurement and manufacturing of electricity grid components, and would require the proceeds of the bonds to be deposited into the respective accounts and used exclusively for the purposes of the initiative. By establishing a continuously appropriated fund, the bill would make an appropriation.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law establishes the Governors Office of Business and Economic Development (GO-Biz) within the Governors office and requires GO-Biz to serve the Governor as the lead entity for economic strategy and the marketing of California on issues relating to business development, private sector investment, and economic growth. Existing law creates within GO-Biz the Energy Unit to accelerate the planning, financing, and execution of critical energy infrastructure projects, as specified.
This bill would require the Energy Unit, in coordination with other specified state entities, to establish the California Grid Manufacturing Initiative. The bill would require the Energy Unit to serve as the states central entity for aggregating demand for critical electricity grid components, to coordinate the procurement of electricity grid components, and to incentivize new or existing in-state manufacturing of electricity grid components.
This bill would require each public utility, as defined, on or before January 1, 2028, to submit to the Energy Unit a projection of its purchasing needs for critical electricity grid components for the period of January 1, 2028, through December 31, 2032, inclusive, as provided. the Energy Unit to develop a process for each public utility, on or before January 1, 2028 and regularly thereafter, to submit a projection of its purchasing needs for critical electricity grid components for which the public utility has not entered into a purchase agreement. The bill would require the Energy Unit, based on the projections, to determine the statewide aggregate purchasing needs for critical electricity grid components, as specified. The bill would require a public utility that purchases electricity grid components identified pursuant to the bill to purchase those components from the initiative, except as provided. The bill would permit an electrical corporation, and require the Public Utilities Commission, to authorize the recovery of costs incurred by the electrical corporation in implementing the above-described requirements, and would authorize a local publicly owned electric utility to recover the costs incurred from the implementation of the above-described requirements from its ratepayers. By imposing new duties on local publicly owned electric utilities, the bill would impose a state-mandated local program.
Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing the bills requirement regulating the procurement practices of electrical corporations would be a crime, this bill would impose a state-mandated local program.
This bill would authorize the Energy Unit to issue requests for proposals or other competitive solicitations to procure critical electricity grid components, as provided, and would authorize the Energy Unit, if it determines that supply is constrained or unreasonably costly, to offer targeted incentives to suppliers that establish or expand manufacturing capacity within California. provided. The bill would require the Energy Unit to identify any critical electricity grid components for which cost, supply constraints, or other limitations inhibit the states ability to achieve its energy goals, and would authorize the Energy Unit to provide financial assistance to projects that establish or expand manufacturing capacity in California for those components, as specified. The bill would also authorize the Energy Unit to enter into production joint ventures with qualified private suppliers, as provided, and to provide bond financing and other assistance.
Existing law, the Bergeson-Peace Infrastructure and Economic Development Bank Act, establishes the California Infrastructure and Economic Development Bank (I-Bank) within GO-Biz and, among other things, authorizes the I-Bank to make loans, issue bonds, and provide financial assistance for various types of projects that qualify as economic development or public development facilities, as provided.
This bill would create the California Grid Manufacturing Initiative Revolving Fund in the State Treasury, and the Manufacturing Incentive Account and the Procurement Account within the revolving fund, for the purpose of providing financial assistance pursuant to the initiative. The bill would make the moneys in the revolving fund continuously appropriated for expenditure in accordance with the initiative. The bill would authorize the I-Bank, on behalf of the Energy Unit, to issue revenue bonds to finance procurement and manufacturing of electricity grid components, and would require the proceeds of the bonds to be deposited into the respective accounts and used exclusively for the purposes of the initiative. By establishing a continuously appropriated fund, the bill would make an appropriation.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law establishes the Governors Office of Business and Economic Development (GO-Biz) within the Governors office and requires GO-Biz to serve the Governor as the lead entity for economic strategy and the marketing of California on issues relating to business development, private sector investment, and economic growth. Existing law creates within GO-Biz the Energy Unit to accelerate the planning, financing, and execution of critical energy infrastructure projects, as specified.
This bill would require the Energy Unit, in coordination with other specified state entities, to establish the California Grid Manufacturing Initiative. The bill would require the Energy Unit to serve as the states central entity for aggregating demand for critical electricity grid components, to coordinate the procurement of electricity grid components, and to incentivize new or existing in-state manufacturing of electricity grid components.
This bill would require each public utility, as defined, on or before January 1, 2028, to submit to the Energy Unit a projection of its purchasing needs for critical electricity grid components for the period of January 1, 2028, through December 31, 2032, inclusive, as provided. The bill would require the Energy Unit, based on the projections, to determine the statewide aggregate purchasing needs for electricity grid components, as specified. The bill would require a public utility that purchases electricity grid components identified pursuant to the bill to purchase those components from the initiative, except as provided. The bill would permit an electrical corporation, and require the Public Utilities Commission, to authorize the recovery of costs incurred by the electrical corporation in implementing the above-described requirements, and would authorize a local publicly owned electric utility to recover the costs incurred from the implementation of the above-described requirements from its ratepayers. By imposing new duties on local publicly owned electric utilities, the bill would impose a state-mandated local program.
Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing the bills requirement regulating the procurement practices of electrical corporations would be a crime, this bill would impose a state-mandated local program.
This bill would authorize the Energy Unit to issue requests for proposals or other competitive solicitations to procure electricity grid components, as provided, and would authorize the Energy Unit, if it determines that supply is constrained or unreasonably costly, to offer targeted incentives to suppliers that establish or expand manufacturing capacity within California. The bill would also authorize the Energy Unit to enter into production joint ventures with qualified private suppliers, as provided, and to provide bond financing and other assistance.
Existing law, the Bergeson-Peace Infrastructure and Economic Development Bank Act, establishes the California Infrastructure and Economic Development Bank (I-Bank) within GO-Biz and, among other things, authorizes the I-Bank to make loans, issue bonds, and provide financial assistance for various types of projects that qualify as economic development or public development facilities, as provided.
This bill would create the California Grid Manufacturing Initiative Revolving Fund in the State Treasury, and the Manufacturing Incentive Account and the Procurement Account within the revolving fund, for the purpose of providing financial assistance pursuant to the initiative. The bill would make the moneys in the revolving fund continuously appropriated for expenditure in accordance with the initiative. The bill would authorize the I-Bank, on behalf of the Energy Unit, to issue revenue bonds to finance procurement and manufacturing of electricity grid components, and would require the proceeds of the bonds to be deposited into the respective accounts and used exclusively for the purposes of the initiative. By establishing a continuously appropriated fund, the bill would make an appropriation.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
The Legislature finds and declares all of the following:
(a)Californias electric system depends on timely access to large power transformers, distribution transformers, and other critical electricity grid components to ensure reliability, affordable rates, wildfire resilience, emergency response, and the achievement of the states clean energy goals.
(b)National and global supply chain constraints have resulted in extended lead times, elevated costs, and limited availability of critical electricity grid components.
(c)Fragmented procurement and uncoordinated demand signaling by utilities and public agencies can increase market uncertainty and may inhibit investment in manufacturing capacity.
(d)Coordinated demand aggregation, centralized procurement, advance market commitments, and targeted manufacturing incentives can reduce risk, lower costs, and expand supply for critical electricity grid components that are forecast in California energy planning processes.
(e)In certain circumstances, market forces alone are insufficient to ensure adequate and timely supply, necessitating state-enabled intervention, including public-private partnerships.
(f)Manufacturing Increased in-state manufacturing of critical electricity grid components holds the potential to supply a significant base of high-skill, high-paying jobs in California and equip the electrical grid for mass electrification.
SEC. 2.Article 8 (commencing with Section 12100.80) is added to Chapter 1.6 of Part 2 of Division 3 of Title 2 of the Government Code, to read:8.California Grid Manufacturing Initiative 12100.80.The following definitions apply for purposes of this article:
(a)Commission means the Public Utilities Commission.
(a)(b)Critical electricity grid components means electricity grid components for which supply constraints, extended lead times, elevated costs, or other limitations to procurement are causing delays to the construction, upgrade, or maintenance of transmission and distribution infrastructure.
(c)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(b)(d)Electricity grid components means equipment equipment, materials, or devices used in the transmission, distribution, or storage of electricity, including, but not limited to, transformers, cables, wires, circuit breakers, reconductors, and switchgears.
(c)(e)Energy Unit means the Energy Unit created within the Governors Office of Business and Economic Development pursuant to Section 12100.110.
(d)(f)High road employment means employment that is consistent with the job quality standards and employment practices set forth in subdivision (s) of Section 14005 of the Unemployment Insurance Code.
(e)(g)Initiative means the California Grid Manufacturing Initiative established pursuant to Section 12100.81.
(f)(h)Public utility means an electrical corporation as defined in Section 218 of the Public Utilities Code or a local publicly owned electric utility as defined in Section 224.3 of the Public Utilities Code.
12100.81.The Energy Unit, in coordination with the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, the Independent System Operator, public utilities, and the California Infrastructure and Economic Development Bank, shall establish the California Grid Manufacturing Initiative to implement the purposes of this article.
12100.82.The Energy Unit shall do both all of the following:
(a)Identify and procure critical electricity grid components, which includes, but is not limited to:(1)Identifying critical electricity grid components in coordination with public utilities.(2)Determining the appropriate form or forms of state assistance to address identified delays, including, but not limited to, centralized procurement on behalf of public utilities.(3)Where centralized procurement is warranted, serve as the states central entity for aggregating demand and coordinating the procurement of critical electricity grid components on behalf of participating public utilities.(a)Determine and provide appropriate forms of state assistance to address identified delays with critical electricity grid components.
(b)Incentivize new or existing in-state manufacturing of electricity grid components.
(c)Provide support to joint procurements.
12100.83.(a)Consistent with the process and schedule adopted pursuant to subdivision (b), the Energy Unit shall identify electricity grid components for which central procurement would further the purposes of this article.(b)(1)The Energy Unit shall develop a process for each public utility, on or before January 1, 2028, and regularly thereafter, to submit a projection of its purchasing needs for critical electricity grid components for which the public utility has not entered into a purchase agreement and for which the public utility affirmatively seeks the assistance of the Energy Unit in coordinating resources and leveraging purchasing power.(2)The projection shall include all of the following:(A)Component types and specifications.(B)Quantities needed of each of the component types.(C)Delivery timelines.(c)Based on the projections, the Energy Unit shall determine the statewide aggregate purchasing needs for critical electricity grid components, which shall serve as the basis for procurement and manufacturing incentives pursuant to this article.(d)The Energy Unit shall also determine other forms of state assistance, separate from central procurement, to support the purchasing of critical electricity grid components, including but not limited to, upstream supply chain intervention, technical assistance, and regulatory coordination.12100.84.(a)If the Energy Unit determines that centralized procurement is warranted for a critical electrical grid component identified pursuant to Section 12100.83, a participating public utility may, prior to the issuance of a solicitation under Section 12100.85, submit to the Energy Unit the conditions under which the public utility commits to purchase those components from the initiative, unless the initiative is unable to provide the requested electricity grid components. Conditions may include, but are not limited to, any of the following:(1)A maximum price or not-to-exceed cost threshold.(2)Technical specifications and performance requirements.(3)Delivery timelines.(4)Other reasonable commercial terms.(b)If a procurement conducted pursuant to Section 12100.85 satisfies the conditions submitted by a public utility pursuant to subdivision (a), the public utilitys commitment to purchase the component from the initiative shall be binding, and the associated offtake obligation shall apply regardless of whether the equipment is utilized.12100.85.(a)The Energy Unit is authorized to issue requests for proposals or other competitive solicitations to procure critical electricity grid components based on the states aggregate purchasing needs for critical electricity grid components, as identified pursuant to subdivision (c) of Section 12100.83.(b)In evaluating proposals received through a solicitation, consistent with the conditions submitted by participating public utilities pursuant to Section 12100.84, the Energy Unit shall consider all of the following, prioritizing proposals in this order:(1)Timeliness of delivery.(2)Cost-effectiveness, as determined in consultation with the Public Utilities Commission and public utilities, as appropriate.(3)Extent of support for long-term, high road employment in the state.(c)Prior to each solicitation, the Energy Unit, in coordination with the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, the Independent System Operator, and the California Infrastructure and Economic Development Bank, shall evaluate whether the market can meet demand in a timely and cost-effective manner without intervention.(d)If the Energy Unit determines, in coordination with the entities listed in subdivision (c), that the market cannot meet demand for a critical electricity grid component in a timely and cost-effective manner without intervention, the Energy Unit shall notify public utilities as soon as practicable.12100.83.(a)(1)As soon as practicable, the commission, in consultation with the State Energy Resources Conservation and Development Commission and the Independent System Operator, shall, in a new or existing proceeding, develop a process to identify critical electricity grid components and to assess the statewide need for critical electricity grid components for the next 10-year period. The assessment shall include identification of specific strategies to reduce delays and ratepayer costs associated with the procurement of critical electricity grid components.
(2)The commission shall, at least once every five years, update the identification and assessment specified in paragraph (1).
(b)To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning process of the commission.
12100.84.(a)(1)For each critical electricity grid component identified pursuant to subdivision (a) of Section 12100.83, the commission shall determine whether requiring electrical corporations to engage in the joint procurement of the critical electricity grid component would further the purposes of this article.
(2)(A)If the commission determines that engaging in the joint procurement of a critical electricity grid component furthers the purposes of this article and electrical corporations would benefit from the joint procurement of the critical electricity grid component, the commission may require electrical corporations to engage in a joint procurement to fulfill the projected purchasing needs of each participating electrical corporation for the critical electricity grid component through a joint purchase agreement. The projected purchasing needs shall be subject to the review and approval of the commission.
(B)A local publicly owned electric utility may participate in the joint procurement of the critical electricity grid component with the electrical corporations.
(3)The commission shall seek to ensure that a joint procurement maximizes the reduction of purchasing costs and delays, and addresses the need for the critical electricity grid components over an extended planning horizon, to the extent prudent.
(4)If electrical corporations are required to engaged in a joint procurement of critical electricity grid component pursuant to subparagraph (A) of paragraph (2), not more than 12 months following the imposition of the requirement, the electrical corporations shall do all of the following:
(A)Engage in joint and cooperative consultations between and among the electrical corporations and suppliers of critical electricity grid components to determine contract requirements.
(B)Engage in a joint cooperative process for the sourcing and negotiation of joint purchase agreements, including negotiation of performance, price, quantity, and specifications, for the purchase of critical electricity grid components.
(C)Jointly submit proposed purchase agreements to the commission for its approval.
(D)Engage in other joint and collaborative activities pertaining to the collaboration and joint contracting for purchase of critical electricity grid components as the electrical corporations may determine is necessary for implementation of joint procurements, subject to approval by the commission.
(b)The commission shall require electrical corporations to take actions the commission deems necessary to effectuate the goals of this article in soliciting and procuring critical electricity grid components pursuant to a joint procurement.
(c)(1)An electrical corporation shall not be liable for the purchase commitments of another electrical corporation, or local publicly owned utility that elects to participate, under a joint purchase agreement.
(2)Notwithstanding the requirements of paragraph (1), a joint purchase agreement may provide for equipment sharing arrangements consistent with federal law, with the approval of the commission.
(d)(1)The commission shall work with electrical corporations to ensure that the implementation of a joint procurement does not cause delays to the procurement of critical energy grid components.
(2)In furtherance of paragraph (1), the commission may authorize an electrical corporation to continue using existing procurement processes following the implementation of a joint procurement, as the commission determines necessary.
(e)The activities conducted by an electrical corporation pursuant to this section shall be undertaken at the express direction and under the supervision of the commission in furtherance of this article.
(f)(1)In consultation with the commission and electrical corporations, and with local publicly owned electric utilities that elect to participate, the Energy Unit shall offer assistance to qualifying suppliers pursuant to Section 12100.85 in connection with a joint procurement.
(2)In consultation with the commission and relevant stakeholders, the Energy Unit shall determine and provide other forms of state assistance to support the purchasing of critical electricity grid components in connection with a joint procurement, including, but not limited to, upstream supply chain intervention, technical assistance, and regulatory coordination.
(g)(1)The commission may authorize recovery of costs incurred under this article only to the extent it determines those costs are just and reasonable, consistent with Section 451 of the Public Utilities Code, cost effective, and aligned with state energy policy.
(2)To the extent the joint procurement results in costs below prevailing market prices for the critical electricity grid components, the commission shall ensure that the difference is credited to ratepayers in a manner consistent with Section 451 of the Public Utilities Code.
12100.86.12100.85.(a)The Energy Unit may provide financial assistance to projects that establish or expand manufacturing capacity in California for critical electricity grid components. The assistance may include, but is not limited to, any of the following:
(b)The Energy Unit shall work with suppliers to identify barriers to production that can be addressed through regulatory assistance, incentives available through existing programs, or any other forms of assistance.(1)Engaging local public and private actors relevant to project development success.
(2)Supporting efforts of the project applicant to secure necessary permits and other relevant authorities.
(3)Leveraging and coordinating all relevant state incentives and supply chain facilitation services to ensure timely and cost-effective acquisition of physical components of the project.
(c)(b)In providing financial selecting projects to receive assistance pursuant to this article, the Energy Unit shall evaluate projects based on all of the following criteria:
(1)The extent to which the project will further the states clean energy goals, including by reducing delays and costs.
(2)The extent to which the project will create long-term high road employment in California.
(d)Incentives(c)Provision of assistance, including financial assistance if any, shall be conditioned on measurable public benefits, including high road job creation, community benefits, workforce development, affordability, and capacity expansion.
12100.86.(a)The Energy Unit is hereby authorized and empowered to enter into production joint ventures with qualified private suppliers pursuant to this section.
(e)(b)The Energy Unit shall issue one or more requests for qualifications to identify entities that are qualified and willing to enter into production joint ventures with the state to manufacture electricity grid components identified pursuant to subdivision (a) in California.
(f)(c)A request for qualifications issued pursuant to this section shall solicit information, including, but not limited to, all of the following:
(1)Evidence of the experience, competency, capability, and capacity to complete and operate manufacturing projects of similar size, scope, or complexity, including financial condition, relevant technical expertise, and demonstrated management competency.
(2)High road employment commitments, history of compliance with workplace laws and regulations, and safety record.
(g)(d)The Energy Unit, after evaluating the responses to the request for qualifications, may do any of the following:
(1)Select one or more qualified suppliers to enter negotiations for production joint ventures as described in Section 12100.87. ventures.
(2)Invite selected respondents to submit detailed proposals or bids.
(3)Decline to proceed if market conditions improve.
(h)(e)The Energy Unit is not obligated to enter into a joint venture or provide incentives to an entity that responds to a request for qualifications.
(f)Production joint ventures shall be structured to provide for all of the following:
(1)Shared ownership, equity stakes, or other legally permissible participation by the state.
(2)Establishment or expansion of manufacturing facilities within California.
(3)Lower cost for finished products as compared to prevailing market prices.
(g)Production joint ventures may be structured to provide for either or both of the following:
(1)Allocation of design, construction, financing, and operational responsibilities to the private partner.
(2)Use of special purpose vehicles to carry out joint venture activities.
(h)The Energy Unit may provide, subject to availability, all of the following:
(1)Low-cost loans, credit enhancements, bond financing, or any other form of financial assistance through the California Infrastructure and Economic Development Bank, as provided in Section 12100.87.
(2)Advance purchase commitments or mandatory offtake agreements.
(3)Site access, leasing of public land, or permitting assistance.
(4)Any other incentives determined by the Energy Unit.
(i)The Energy Unit shall ensure that production joint ventures are awarded through a transparent, competitive, and merit-based process, and are structured to protect public funds, ensure high road jobs, and deliver community benefits.
(j)In accordance with the conflict-of-interest provisions of the Political Reform Act of 1974 (Title 9 (commencing with Section 81000)), the Energy Unit shall adopt conflict-of-interest policies governing employees and contractors involved in procurement decisions and joint venture negotiations pursuant to this article.
12100.87.(a)The Energy Unit is authorized to enter into production joint ventures with qualified private suppliers selected through the request for qualifications process described in Section 12100.86.(b)Production joint ventures shall be structured to provide for all of the following:(1)Shared ownership, equity stakes, or other legally permissible participation by the state.(2)Establishment or expansion of manufacturing facilities within California.(3)Lower cost for finished products as compared to prevailing market prices.(c)Production joint ventures may be structured to provide for either or both of the following:(1)Allocation of design, construction, financing, and operational responsibilities to the private partner.(2)Use of special purpose vehicles to carry out joint venture activities.(d)The Energy Unit may provide, subject to availability, all of the following:(1)Bond financing through the California Infrastructure and Economic Development Bank, as provided in Section 12100.88.(2)Low-cost loans or loan guarantees.(3)Advance purchase commitments or mandatory offtake agreements.(4)Site access, leasing of public land, or permitting assistance.(e)Private suppliers or joint ventures shall submit operating plans that articulate how they will meet cost recovery and procurement goals of the Energy Unit.(f)The Energy Unit shall ensure that production joint ventures are awarded through a transparent, competitive, and merit-based process, and are structured to protect public funds, ensure high road jobs, and deliver community benefits.(g)In accordance with the conflict of interest provisions of the Political Reform Act of 1974 (Title 9 (commencing with Section 81000)), the Energy Unit shall adopt conflict-of-interest policies governing employees and contractors involved in procurement decisions and joint venture negotiations pursuant to this article.12100.88.12100.87.The California Infrastructure and Economic Development Bank, on behalf of the Energy Unit, may issue revenue bonds to finance procurement and manufacturing of provide financial assistance in connection with projects that establish or expand manufacturing capacity in California for critical electricity grid components, as provided in Article 12 (commencing with Section 63049.80) of Chapter 2 of Division 1 of Title 6.7.
12100.89.(a)The Public Utilities Commission may authorize recovery of costs incurred under this article only to the extent it determines those costs are just and reasonable, consistent with Section 451 of the Public Utilities Code, cost-effective, and aligned with state energy policy.(b)To the extent the procurement through the initiative results in costs below prevailing market prices for grid components, the Public Utilities Commission shall ensure that the difference is credited to ratepayers in a manner consistent with Section 451 of the Public Utilities Code.12100.90.12100.88.The Energy Unit shall submit an annual report to the Legislature detailing purchasing needs, procurements, its efforts undertaken in support of the initiative, manufacturing capacity added, ratepayer costs and savings, job benefits, and fiscal impacts related to the implementation of this article. The annual reports shall be submitted in compliance with Section 9795.
12100.91.12100.89.If any provision of this article or its application is held invalid, that invalidity shall not affect other provisions or applications, which shall remain in full force and effect.
SEC. 3.Article 12 (commencing with Section 63049.80) is added to Chapter 2 of Division 1 of Title 6.7 of the Government Code, to read:12.California Electricity Grid Financing63049.80.For purposes of this article, the following terms have the following meanings:
(a)Account means either of the following:(1)The Manufacturing Incentive Account established pursuant to Section 63049.81.(2)The Procurement Account established pursuant to Section 63049.81.(b)(a)California Grid Manufacturing Initiative means the California Grid Manufacturing Initiative established pursuant to Article 8 (commencing with Section 12100.80) of Chapter 1.6 of Part 2 of Division 3 of Title 2.
(b)Eligible project means any project selected by the Energy Unit to receive assistance pursuant to Section 12100.85 or a production joint venture entered into pursuant to Section 12100.86.
(c)Energy Unit means the Energy Unit created within the Governors Office of Business and Economic Development pursuant to Section 12100.110.
(d)Participating party means any public or private entity, profit or nonprofit, engaged in an eligible project.
(d)(e)Revolving fund means the California Grid Manufacturing Initiative Revolving Fund established pursuant to Section 63049.81.
63049.81.(a)There is hereby created the California Grid Manufacturing Initiative Revolving Fund in the State Treasury, and the Manufacturing Incentive Account and the Procurement Account within the revolving fund, Treasury for the purpose of providing financial assistance pursuant to the California Grid Manufacturing Initiative and, notwithstanding Section 13340, moneys in the revolving fund and the accounts are hereby continuously appropriated, without regard to fiscal years, to the Energy Unit for expenditure in accordance with the California Grid Manufacturing Initiative.
(b)Moneys generated for purposes of Section 12100.87, including proceeds from the sale of bonds to support manufacturing of electricity grid components pursuant to Section 63049.82, shall be deposited into the Manufacturing Incentive Account.(c)Moneys generated for purposes of Section 12100.85, including proceeds from the sale of bonds to support the California Grid Manufacturing Initiatives procurement of electricity grid components and revenues generated from the sale of those components to public utilities, shall be deposited into the Procurement Account.63049.82.(a)The bank, on behalf of the Energy Unit, may issue taxable or tax-exempt revenue bonds pursuant to Chapter 5 (commencing with Section 63070) to finance procurement and manufacturing of critical electricity grid components pursuant to the California Grid Manufacturing Initiative. The proceeds of the any bonds shall be deposited into the respective accounts, as provided in Section 63049.81, an account in the revolving fund and used exclusively for the purposes of the California Grid Manufacturing Initiative. Bond proceeds may also be used to fund necessary reserves, capitalized interest, or costs of issuance.
(b)Bonds issued under this article shall not be deemed to constitute a debt or liability of the state or of any political subdivision of the state or a pledge of the faith and credit of the state or of any political subdivision, other than the bank, but shall be payable solely from the revolving fund and the assets of the revolving fund, and the security provided by the revolving fund. All bonds issued under this article shall contain on the face of the bonds a statement to that effect.
63049.83.(a)The bank may provide financial assistance, including financial assistance from the proceeds of the bonds issued pursuant to Section 63049.82, to a participating party in connection with the financing or refinancing of an eligible project.
(b)(1)The bank shall meet and confer with the Energy Unit for eligible projects.
(2)The bank shall respond to requests from the Energy Unit and collaborating agencies to evaluate and consult on the credit and financial aspects of eligible projects.
(3)Final authority to provide financial support to an eligible project shall reside with the Energy Unit, and the Energy Unit shall direct the bank, at its discretion.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares all of the following:
(a)Californias electric system depends on timely access to large power transformers, distribution transformers, and other critical electricity grid components to ensure reliability, affordable rates, wildfire resilience, emergency response, and the achievement of the states clean energy goals.
(b)National and global supply chain constraints have resulted in extended lead times, elevated costs, and limited availability of critical electricity grid components.
(c)Fragmented procurement and uncoordinated demand signaling by utilities and public agencies can increase market uncertainty and may inhibit investment in manufacturing capacity.
(d)Coordinated demand aggregation, centralized procurement, advance market commitments, and targeted manufacturing incentives can reduce risk, lower costs, and expand supply for grid components that are forecast in California energy planning processes.
(e)In certain circumstances, market forces alone are insufficient to ensure adequate and timely supply, necessitating state-enabled intervention, including public-private partnerships.
(f)Manufacturing of critical electricity grid components constitutes a strategic industry for state intervention and support given the significant need to equip the electrical grid for mass electrification, the encumbered supply chain in California and the United States as a whole, and the potential for these industries holds the potential to supply a significant base of high-skill, high-paying jobs in California. California and equip the electrical grid for mass electrification.
SEC. 2.Article 8 (commencing with Section 12100.80) is added to Chapter 1.6 of Part 2 of Division 3 of Title 2 of the Government Code, to read:8.California Grid Manufacturing Initiative 12100.80.The following definitions apply for purposes of this article:
(a)Critical electricity grid components means any electricity grid components identified pursuant to subdivision (a) of Section 12100.83, which may include, but are for which supply constraints, extended lead times, elevated costs, or other limitations to procurement are causing delays to the construction, upgrade, or maintenance of transmission and distribution infrastructure.
(b)Electricity grid components means equipment materials, or devices used in the transmission, distribution, or storage of electricity, including, but not limited to, transformers, cables, wires, circuit breakers, reconductors, and switchgears.
(b)(c)Energy Unit means the Energy Unit created within the Governors Office of Business and Economic Development pursuant to Section 12100.110.
(c)(d)High road employment means employment that is consistent with the job quality standards and employment practices set forth in subdivision (s) of Section 14005 of the Unemployment Insurance Code.
(d)(e)Initiative means the California Grid Manufacturing Initiative established pursuant to Section 12100.81.
(e)(f)Public utility means an electrical corporation as defined in Section 218 of the Public Utilities Code or a local publicly owned electric utility as defined in Section 224.3 of the Public Utilities Code.
12100.81.The Energy Unit, in coordination with the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, the Independent System Operator, public utilities, and the California Infrastructure and Economic Development Bank, shall establish the California Grid Manufacturing Initiative to implement the purposes of this article.
12100.82.The Energy Unit shall do all both of the following:
(a)Serve as the states central entity for aggregating demand for critical electricity grid components.(b)Coordinate the procurement of electricity grid components.(a)Identify and procure critical electricity grid components, which includes, but is not limited to:
(1)Identifying critical electricity grid components in coordination with public utilities.
(2)Determining the appropriate form or forms of state assistance to address identified delays, including, but not limited to, centralized procurement on behalf of public utilities.
(3)Where centralized procurement is warranted, serve as the states central entity for aggregating demand and coordinating the procurement of critical electricity grid components on behalf of participating public utilities.
(c)(b)Incentivize new or existing in-state manufacturing of electricity grid components.
12100.83.(a)Consistent with the process and schedule adopted pursuant to subdivision (b), the Energy Unit shall identify electricity grid components for which central procurement would further the purposes of this article.
(b)(1)The Energy Unit shall develop a process for each public utility, on or before January 1, 2028, and regularly thereafter, to submit a projection of its purchasing needs for critical electricity grid components for which the public utility has not entered into a purchase agreement. agreement and for which the public utility affirmatively seeks the assistance of the Energy Unit in coordinating resources and leveraging purchasing power.
(2)The projection shall include all of the following:
(A)Component types and specifications.
(B)Quantities needed of each of the component types.
(C)Delivery timelines.
(c)Based on the projections, the Energy Unit shall determine the statewide aggregate purchasing needs for critical electricity grid components, which shall serve as the basis for procurement and manufacturing incentives pursuant to this article.
(d)The Energy Unit shall also determine other forms of state assistance, separate from central procurement, to support the purchasing of critical electricity grid components, including but not limited to, upstream supply chain intervention, technical assistance, and regulatory coordination.
12100.84.(a)A public utility that purchases electricity grid components identified pursuant to Section 12100.83 shall purchase those components from the initiative, unless the initiative is unable to provide the requested electricity grid components.(b)(1)An electrical corporation may, and the Public Utilities Commission shall, authorize the recovery of costs incurred by the electrical corporation pursuant to this article.(2)A local publicly owned electric utility may recover from its ratepayers its costs incurred pursuant to this article.(c)The associated offtake obligation shall apply regardless of whether the equipment is utilized.(d)A public utility shall not substitute alternative procurement mechanisms in lieu of participation in the Energy Units authorized procurement in a manner that undermines the demand signal to manufacturers.12100.84.(a)If the Energy Unit determines that centralized procurement is warranted for a critical electrical grid component identified pursuant to Section 12100.83, a participating public utility may, prior to the issuance of a solicitation under Section 12100.85, submit to the Energy Unit the conditions under which the public utility commits to purchase those components from the initiative, unless the initiative is unable to provide the requested electricity grid components. Conditions may include, but are not limited to, any of the following:
(1)A maximum price or not-to-exceed cost threshold.
(2)Technical specifications and performance requirements.
(3)Delivery timelines.
(4)Other reasonable commercial terms.
(b)If a procurement conducted pursuant to Section 12100.85 satisfies the conditions submitted by a public utility pursuant to subdivision (a), the public utilitys commitment to purchase the component from the initiative shall be binding, and the associated offtake obligation shall apply regardless of whether the equipment is utilized.
12100.85.(a)The Energy Unit is authorized to issue requests for proposals or other competitive solicitations to procure critical electricity grid components based on the states aggregate purchasing needs for critical electricity grid components, as identified pursuant to subdivision (c) of Section 12100.83.
(b)In evaluating proposals received through a solicitation, the Energy Unit shall prioritize proposals that further the states goals of promoting in-state manufacturing and high road employment. consistent with the conditions submitted by participating public utilities pursuant to Section 12100.84, the Energy Unit shall consider all of the following, prioritizing proposals in this order:
(1)Timeliness of delivery.
(2)Cost-effectiveness, as determined in consultation with the Public Utilities Commission and public utilities, as appropriate.
(3)Extent of support for long-term, high road employment in the state.
(c)The Energy Unit Prior to each solicitation, the Energy Unit, in coordination with the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, the Independent System Operator, and the California Infrastructure and Economic Development Bank, shall evaluate whether the market can meet demand in a timely and cost-effective manner without intervention.
(d)If the Energy Unit determines, in coordination with the entities listed in subdivision (c), that the market cannot meet demand for a critical electricity grid component in a timely and cost-effective manner without intervention, the Energy Unit shall notify public utilities as soon as practicable.
12100.86.(a)The Energy Unit shall identify any critical electricity grid components for which cost, supply constraints, or other limitations inhibit the states ability to achieve its energy goals.(b)(1)12100.86.(a)The Energy Unit may provide financial assistance to projects that establish or expand manufacturing capacity in California for those components as provided in Section 12100.88. electricity grid components.
(2)(b)The Energy Unit shall work with suppliers to identify barriers to production that can be addressed through regulatory assistance, incentives available through existing programs, or any other forms of assistance.
(c)In providing financial assistance pursuant to this article, the Energy Unit shall evaluate projects based on all the following criteria:
(1)The extent to which the project will further the states energy goals, including by reducing delays and costs.
(2)The extent to which the project will create long-term high road employment in California.
(d)Incentives shall be conditioned on measurable public benefits, including high road job creation, community benefits, workforce development, affordability, and capacity expansion.
(e)The Energy Unit shall issue one or more requests for qualifications to identify entities that are qualified and willing to enter into production joint ventures with the state to manufacture critical electricity grid components identified pursuant to subdivision (a) in California.
(f)A request for qualifications issued pursuant to this section shall solicit information, including, but not limited to, all of the following:
(1)Evidence of the experience, competency, capability, and capacity to complete and operate manufacturing projects of similar size, scope, or complexity, including financial condition, relevant technical expertise, and demonstrated management competency.
(2)High road employment commitments, history of compliance with workplace laws and regulations, and safety record.
(g)The Energy Unit, after evaluating the responses to the request for qualifications, may do any of the following:
(1)Select one or more qualified suppliers to enter negotiations for production joint ventures as described in Section 12100.87.
(2)Invite selected respondents to submit detailed proposals or bids.
(3)Decline to proceed if market conditions improve.
(h)The Energy Unit is not obligated to enter into a joint venture or provide incentives to an entity that responds to a request for qualifications.
12100.87.(a)The Energy Unit is authorized to enter into production joint ventures with qualified private suppliers selected through the request for qualifications process described in Section 12100.86.
(b)Production joint ventures shall be structured to provide for all of the following:
(1)Shared ownership, equity stakes, or other legally permissible participation by the state.
(2)Establishment or expansion of manufacturing facilities within California.
(3)Lower cost for finished products as compared to prevailing market prices.
(c)Production joint ventures may be structured to provide for either or both of the following:
(1)Allocation of design, construction, financing, and operational responsibilities to the private partner.
(2)Use of special purpose vehicles to carry out joint venture activities.
(d)The Energy Unit may provide, subject to availability, all of the following:
(1)Bond financing through the California Infrastructure and Economic Development Bank, as provided in Section 12100.88.
(2)Low-cost loans or loan guarantees.
(3)Advance purchase commitments or mandatory offtake agreements.
(4)Site access, leasing of public land, or permitting assistance.
(e)Private suppliers or joint ventures shall submit operating plans that articulate how they will meet cost recovery and procurement goals of the Energy Unit.
(f)The Energy Unit shall ensure that production joint ventures are awarded through a transparent, competitive, and merit-based process, and are structured to protect public funds, ensure high road jobs, and deliver community benefits.
(g)In accordance with the conflict of interest provisions of the Political Reform Act of 1974 (Title 9 (commencing with Section 81000)), the Energy Unit shall adopt conflict-of-interest policies governing employees and contractors involved in procurement decisions and joint venture negotiations pursuant to this article.
12100.88.The California Infrastructure and Economic Development Bank, on behalf of the Energy Unit, may issue revenue bonds to finance procurement and manufacturing of electricity grid components, as provided in Article 12 (commencing with Section 63049.80) of Chapter 2 of Division 1 of Title 6.7.
12100.89.(a)Upon application by the Energy Unit, the Public Utilities Commission shall approve recovery of costs incurred under this chapter from electric ratepayers.(b)Recoverable costs may include procurement payments, bond repayment obligations, storage costs, and administrative expenses, net of any offsetting revenues.(c)Cost recovery shall be subject to commission review for reasonableness, cost-effectiveness, and alignment with state energy policy.12100.89.(a)The Public Utilities Commission may authorize recovery of costs incurred under this article only to the extent it determines those costs are just and reasonable, consistent with Section 451 of the Public Utilities Code, cost-effective, and aligned with state energy policy.
(b)To the extent the procurement through the initiative results in costs below prevailing market prices for grid components, the Public Utilities Commission shall ensure that the difference is credited to ratepayers in a manner consistent with Section 451 of the Public Utilities Code.
12100.90.The Energy Unit shall submit an annual report to the Legislature detailing purchasing needs, procurements, manufacturing capacity added, ratepayer costs and savings, job benefits, and fiscal impacts related to the implementation of this article. The annual reports shall be submitted in compliance with Section 9795.
12100.91.If any provision of this article or its application is held invalid, that invalidity shall not affect other provisions or applications, which shall remain in full force and effect.
SEC. 3.Article 12 (commencing with Section 63049.80) is added to Chapter 2 of Division 1 of Title 6.7 of the Government Code, to read:12.California Electricity Grid Financing63049.80.For the purposes of this article, the following terms have the following meanings:
(a)Account means either of the following:
(1)The Manufacturing Incentive Account established pursuant to Section 63049.81.
(2)The Procurement Account established pursuant to Section 63049.81.
(b)California Grid Manufacturing Initiative means the California Grid Manufacturing Initiative established pursuant to Article 8 (commencing with Section 12100.80) of Chapter 1.6 of Part 2 of Division 3 of Title 2.
(c)Energy Unit means the Energy Unit created within the Governors Office of Business and Economic Development pursuant to Section 12100.110.
(d)Revolving fund means the California Grid Manufacturing Initiative Revolving Fund established pursuant to Section 63049.81.
63049.81.(a)There is hereby created the California Grid Manufacturing Initiative Revolving Fund in the State Treasury, and the Manufacturing Incentive Account and the Procurement Account within the revolving fund, for the purpose of providing financial assistance pursuant to the California Grid Manufacturing Initiative and, notwithstanding Section 13340, moneys in the revolving fund and the accounts are hereby continuously appropriated, without regard to fiscal years, to the Energy Unit for expenditure in accordance with the California Grid Manufacturing Initiative.
(b)Moneys generated for purposes of Section 12100.87, including proceeds from the sale of bonds to support manufacturing of electricity grid components pursuant to Section 63049.82, shall be deposited into the Manufacturing Incentive Account.
(c)Moneys generated for purposes of Section 12100.85, including proceeds from the sale of bonds to support the California Grid Manufacturing Initiatives procurement of electricity grid components and revenues generated from the sale of those components to public utilities, shall be deposited into the Procurement Account.
63049.82.(a)The bank, on behalf of the Energy Unit, may issue taxable or tax-exempt revenue bonds pursuant to Chapter 5 (commencing with Section 63070) to finance procurement and manufacturing of electricity grid components pursuant to the California Grid Manufacturing Initiative. The proceeds of the bonds shall be deposited into the respective accounts, as provided in Section 63049.81, and used exclusively for the purposes of the California Grid Manufacturing Initiative. Bond proceeds may also be used to fund necessary reserves, capitalized interest, or costs of issuance.
(b)Bonds issued under this article shall not be deemed to constitute a debt or liability of the state or of any political subdivision of the state or a pledge of the faith and credit of the state or of any political subdivision, other than the bank, but shall be payable solely from the revolving fund and the assets of the revolving fund, and the security provided by the revolving fund. All bonds issued under this article shall contain on the face of the bonds a statement to that effect.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares all of the following:
(a)Californias electric system depends on timely access to large power transformers, distribution transformers, and other critical electricity grid components to ensure reliability, affordable rates, wildfire resilience, emergency response, and the achievement of the states clean energy goals.
(b)National and global supply chain constraints have resulted in extended lead times, elevated costs, and limited availability of critical grid equipment. electricity grid components.
(c)Fragmented procurement and uncoordinated demand signaling by utilities and public agencies increase market uncertainty and inhibit investment in manufacturing capacity.
(d)Coordinated demand aggregation, centralized procurement, advance market commitments, and targeted manufacturing incentives can reduce risk, lower costs, and expand supply for grid components that are forecast in California energy planning processes.
(e)In certain circumstances, market forces alone are insufficient to ensure adequate and timely supply, necessitating state-enabled intervention, including public-private partnerships.
(f)Transformer manufacturing Manufacturing of critical electricity grid components constitutes a strategic industry for state intervention and support given the significant role of transformers in equipping need to equip the electrical grid for mass electrification, the encumbered supply chain for transformers in California and the United States as a whole, and the potential for transformer manufacturing these industries to supply a significant base of high-skill, high-paying jobs in California.
SEC. 2.Article 8 (commencing with Section 12100.80) is added to Chapter 1.6 of Part 2 of Division 3 of Title 2 of the Government Code, to read:8.California Grid Manufacturing Initiative 12100.80.The following definitions apply for purposes of this article:
(a)Critical electricity grid components means any electricity grid components identified pursuant to subdivision (a) of Section 12100.83, which may include, but are not limited to, transformers, cables, wires, circuit breakers, reconductors, and switchgears.
(a)(b)Energy Unit means the Energy Unit created within the Governors Office of Business and Economic Development pursuant to Section 12100.110.
(c)High road employment means employment that is consistent with the job quality standards and employment practices set forth in subdivision (s) of Section 14005 of the Unemployment Insurance Code.
(b)(d)Initiative means the California Grid Manufacturing Initiative established pursuant to Section 12100.81.
(c)(e)Public utility means an electrical corporation as defined in Section 218 of the Public Utilities Code or a local publicly owned electric utility as defined in Section 224.3 of the Public Utilities Code.
12100.81.The Energy Unit, in coordination with the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, the Independent System Operator, and the California Infrastructure and Economic Development Bank, shall establish the California Grid Manufacturing Initiative to implement the purposes of this article.
12100.82.The Energy Unit shall do all of the following:
(a)Serve as the states central entity for aggregating demand for critical electricity grid components, including large power transformers and distribution transformers. components.
(b)Coordinate the procurement of electricity grid components.
(c)Incentivize new or existing in-state manufacturing of electricity grid components.
12100.83.(a)On or before January 1, 2028, each public utility shall submit to the Energy Unit a projection of its purchasing needs for critical electricity grid components for the period of January 1, 2028, through December 31, 2032, inclusive, for which the public utility has not entered into a purchase agreement.(a)Consistent with the process and schedule adopted pursuant to subdivision (b), the Energy Unit shall identify electricity grid components for which central procurement would further the purposes of this article.
(b)(1)The Energy Unit shall develop a process for each public utility, on or before January 1, 2028, and regularly thereafter, to submit a projection of its purchasing needs for critical electricity grid components for which the public utility has not entered into a purchase agreement.
(b)(2)The projection shall include all of the following:
(1)(A)Component types and specifications.
(2)(B)Quantities needed of each of the component types.
(3)(C)Delivery timelines.
(4)Anticipated emergency, disaster recovery, and resiliency needs.(c)Based on the projections, the Energy Unit shall determine the statewide aggregate purchasing needs for critical electricity grid components, which shall serve as the basis for procurement and manufacturing incentives pursuant to this article.
12100.84.(a)A public utility that purchases electricity grid components identified by pursuant to Section 12100.83 shall purchase those components from the initiative, unless the initiative is unable to provide the requested electricity grid components.
(b)(1)An electrical corporation may, and the Public Utilities Commission shall, authorize the recovery of costs incurred by the electrical corporation pursuant to this article.
(2)A local publicly owned electric utility may recover from its ratepayers its costs incurred pursuant to this article.
(c)The associated offtake obligation shall apply regardless of whether the equipment is utilized.
(d)A public utility shall not substitute alternative procurement mechanisms in lieu of participation in the Energy Units authorized procurement in a manner that undermines the demand signal to manufacturers.
12100.85.(a)The Energy Unit is authorized to issue requests for proposals or other competitive solicitations to procure critical electricity grid components based on the states aggregate purchasing needs for critical electricity grid components, as identified pursuant to subdivision (c) of Section 12100.83.
(b)In conducting procurement pursuant to subdivision (a), the Energy Unit shall prioritize all of the following:(1)Cost and delivery timelines.(2)In-state manufacturing and high road job creation.(3)Capacity expansion.(4)Supply chain resiliency.
(b)In evaluating proposals received through a solicitation, the Energy Unit shall prioritize proposals that further the states goals of promoting in-state manufacturing and high road employment.
(c)The Energy Unit shall evaluate whether the market can meet demand in a timely and cost-effective manner without supply-side intervention.
12100.86.(a)If the Energy Unit determines that supply is constrained or unreasonably costly, it may offer targeted incentives to suppliers that establish or expand manufacturing capacity within California.(b)The Energy Unit shall develop a proposal to offer incentives, which may include any of the following:(1)Bond financing through the California Infrastructure and Economic Development Bank, including for joint ventures.(2)Low-cost loans or loan guarantees.(3)Tax incentives administered through existing authorities.(4)Site, permitting, or regulatory assistance.(5)Advance purchase or demand backstop agreements.(a)The Energy Unit shall identify any critical electricity grid components for which cost, supply constraints, or other limitations inhibit the states ability to achieve its energy goals.
(b)(1)The Energy Unit may provide financial assistance to projects that establish or expand manufacturing capacity in California for those components as provided in Section 12100.88.
(2)The Energy Unit shall work with suppliers to identify barriers to production that can be addressed through regulatory assistance, incentives available through existing programs, or any other forms of assistance.
(c)In providing financial assistance pursuant to this article, the Energy Unit shall evaluate projects based on all the following criteria:
(1)The extent to which the project will further the states energy goals, including by reducing delays and costs.
(2)The extent to which the project will create long-term high road employment in California.
(c)(d)Incentives shall be conditioned on measurable public benefits, including in-state production, high road job creation, community benefits, workforce development, affordability, and capacity expansion.
(d)(e)The Energy Unit shall issue one or more requests for qualifications to identify suppliers, original equipment manufacturers, or consortia entities that are qualified and willing to enter into production joint ventures with the state to manufacture critical electricity grid components identified pursuant to subdivision (a) in California.
(e)(f)A request for qualifications issued pursuant to this section shall solicit information, including, but not limited to, all of the following:
(1)Technical capability and manufacturing experience.(2)Ability to design, construct, finance, and operate manufacturing facilities.(3)Proposed production capacity and timelines.(4)Workforce and high road job quality commitments.(5)Financial capacity and proposed capital contributions.(6)Identification of barriers to production that could be addressed through state financing, procurement commitments, or regulatory assistance.(7)Pricing of finished products.(1)Evidence of the experience, competency, capability, and capacity to complete and operate manufacturing projects of similar size, scope, or complexity, including financial condition, relevant technical expertise, and demonstrated management competency.
(2)High road employment commitments, history of compliance with workplace laws and regulations, and safety record.
(f)(g)The Energy Unit, after evaluating the responses to the request for qualifications, may do any of the following:
(1)Select one or more qualified suppliers to enter negotiations for production joint ventures. ventures as described in Section 12100.87.
(2)Invite selected respondents to submit detailed proposals or bids.
(3)Decline to proceed if market conditions improve.
(g)(h)The Energy Unit is not obligated to enter into a joint venture or provide incentives to an entity that responds to a request for qualifications.
12100.87.(a)The Energy Unit is authorized to enter into production joint ventures with qualified private suppliers selected through the request for qualifications process described in Section 12100.86.
(b)Production joint ventures shall be structured to provide for all of the following:
(1)Shared ownership, equity stakes, or other legally permissible participation by the state.
(2)Establishment or expansion of manufacturing facilities within California.
(3)Lower cost for finished products as compared to prevailing market prices.
(c)Production joint ventures may be structured to provide for either or both of the following:
(1)Allocation of design, construction, financing, and operational responsibilities to the private partner.
(2)Use of special purpose vehicles to carry out joint venture activities.
(d)The Energy Unit may provide, subject to availability, all of the following:
(1)Bond financing through the California Infrastructure and Economic Development Bank, as provided in Section 12100.88.
(2)Low-cost loans or loan guarantees.
(3)Advance purchase commitments or mandatory offtake agreements.
(4)Site access, leasing of public land, or permitting assistance.
(e)Private suppliers or joint ventures shall submit operating plans that articulate how they will meet cost recovery and procurement goals of the Energy Unit.
(f)The Energy Unit shall ensure that production joint ventures are awarded through a transparent, competitive, and merit-based process, and are structured to protect public funds, ensure high road jobs, and deliver community benefits.
12100.88.The California Infrastructure and Economic Development Bank, on behalf of the Energy Unit, may issue revenue bonds to finance procurement and manufacturing of electricity grid components, as provided in Article 12 (commencing with Section 63049.80) of Chapter 2 of Division 1 of Title 6.7.
12100.89.(a)Upon application by the Energy Unit, the Public Utilities Commission shall approve recovery of costs incurred under this chapter from electric ratepayers.
(b)Recoverable costs may include procurement payments, bond repayment obligations, storage costs, and administrative expenses, net of any offsetting revenues.
(c)Cost recovery shall be subject to commission review for reasonableness, cost-effectiveness, and alignment with state energy policy.
12100.90.The Energy Unit shall submit an annual report to the Legislature detailing purchasing needs, procurements, manufacturing capacity added, ratepayer costs and savings, job benefits, and fiscal impacts related to the implementation of this article. The annual reports shall be submitted in compliance with Section 9795.
12100.91.If any provision of this article or its application is held invalid, that invalidity shall not affect other provisions or applications, which shall remain in full force and effect.
SEC. 3.Article 12 (commencing with Section 63049.80) is added to Chapter 2 of Division 1 of Title 6.7 of the Government Code, to read:12.California Electricity Grid Financing63049.80.For the purposes of this article, the following terms have the following meanings:
(a)Account means either of the following:
(1)The Manufacturing Incentive Account established pursuant to Section 63049.81.
(2)The Procurement Account established pursuant to Section 63049.81.
(b)California Grid Manufacturing Initiative means the California Grid Manufacturing Initiative established pursuant to Article 8 (commencing with Section 12100.80) of Chapter 1.6 of Part 2 of Division 3 of Title 2.
(c)Energy Unit means the Energy Unit created within the Governors Office of Business and Economic Development pursuant to Section 12100.110.
(d)Revolving fund means the California Grid Manufacturing Initiative Revolving Fund established pursuant to Section 63049.81.
63049.81.(a)There is hereby created the California Grid Manufacturing Initiative Revolving Fund in the State Treasury, and the Manufacturing Incentive Account and the Procurement Account within the revolving fund, for the purpose of providing financial assistance pursuant to the California Grid Manufacturing Initiative and, notwithstanding Section 13340, moneys in the revolving fund and the accounts are hereby continuously appropriated, without regard to fiscal years, to the Energy Unit for expenditure in accordance with the California Grid Manufacturing Initiative.
(b)Moneys generated for purposes of Section 12100.87, including proceeds from the sale of bonds to support manufacturing of electricity grid components pursuant to Section 63049.82, shall be deposited into the Manufacturing Incentive Account.
(c)Moneys generated for purposes of Section 12100.85, including proceeds from the sale of bonds to support the California Grid Manufacturing Initiatives procurement of electricity grid components and revenues generated from the sale of those components to public utilities, shall be deposited into the Procurement Account.
63049.82.(a)The bank, on behalf of the Energy Unit, may issue taxable or tax-exempt revenue bonds pursuant to Chapter 5 (commencing with Section 63070) to finance procurement and manufacturing of electricity grid components pursuant to the California Grid Manufacturing Initiative. The proceeds of the bonds shall be deposited into the respective accounts, as provided in Section 63049.81, and used exclusively for the purposes of the California Grid Manufacturing Initiative. Bond proceeds may also be used to fund necessary reserves, capitalized interest, or costs of issuance.
(b)Bonds issued under this article shall not be deemed to constitute a debt or liability of the state or of any political subdivision of the state or a pledge of the faith and credit of the state or of any political subdivision, other than the bank, but shall be payable solely from the revolving fund and the assets of the revolving fund, and the security provided by the revolving fund. All bonds issued under this article shall contain on the face of the bonds a statement to that effect.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares all of the following:
(a)Californias electric system depends on timely access to large power transformers, distribution transformers, and other critical grid components to ensure reliability, affordable rates, wildfire resilience, emergency response, and the achievement of the states clean energy goals.
(b)National and global supply chain constraints have resulted in extended lead times, elevated costs, and limited availability of critical grid equipment.
(c)Fragmented procurement and uncoordinated demand signaling by utilities and public agencies increase market uncertainty and inhibit investment in manufacturing capacity.
(d)Coordinated demand aggregation, centralized procurement, advance market commitments, and targeted manufacturing incentives can reduce risk, lower costs, and expand supply for grid components that are forecast in California energy planning processes.
(e)In certain circumstances, market forces alone are insufficient to ensure adequate and timely supply, necessitating state-enabled intervention, including public-private partnerships.
(f)Transformer manufacturing constitutes a strategic industry for state intervention and support given the significant role of transformers in equipping the electrical grid for mass electrification, the encumbered supply chain for transformers in California and the United States as a whole, and the potential for transformer manufacturing to supply a significant base of high-skill, high-paying jobs in California.
SEC. 2.Article 8 (commencing with Section 12100.80) is added to Chapter 1.6 of Part 2 of Division 3 of Title 2 of the Government Code, to read:8.California Grid Manufacturing Initiative 12100.80.The following definitions apply for purposes of this article:
(a)Energy Unit means the Energy Unit created within the Governors Office of Business and Economic Development pursuant to Section 12100.110.
(b)Initiative means the California Grid Manufacturing Initiative established pursuant to Section 12100.81.
(c)Public utility means an electrical corporation as defined in Section 218 of the Public Utilities Code or a local publicly owned electric utility as defined in Section 224.3 of the Public Utilities Code.
12100.81.The Energy Unit, in coordination with the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, the Independent System Operator, and the California Infrastructure and Economic Development Bank, shall establish the California Grid Manufacturing Initiative to implement the purposes of this article.
12100.82.The Energy Unit shall do all of the following:
(a)Serve as the states central entity for aggregating demand for critical electricity grid components, including large power transformers and distribution transformers.
(b)Coordinate the procurement of electricity grid components.
(c)Incentivize new or existing in-state manufacturing of electricity grid components.
12100.83.(a)On or before January 1, 2028, each public utility shall submit to the Energy Unit a projection of its purchasing needs for critical electricity grid components for the period of January 1, 2028, through December 31, 2032, inclusive, for which the public utility has not entered into a purchase agreement.
(b)The projection shall include all of the following:
(1)Component types and specifications.
(2)Quantities needed of each of the component types.
(3)Delivery timelines.
(4)Anticipated emergency, disaster recovery, and resiliency needs.
(c)Based on the projections, the Energy Unit shall determine the statewide aggregate purchasing needs for electricity grid components, which shall serve as the basis for procurement and manufacturing incentives pursuant to this article.
12100.84.(a)A public utility that purchases electricity grid components identified by Section 12100.83 shall purchase those components from the initiative, unless the initiative is unable to provide the requested electricity grid components.
(b)(1)An electrical corporation may, and the Public Utilities Commission shall, authorize the recovery of costs incurred by the electrical corporation pursuant to this article.
(2)A local publicly owned electric utility may recover from its ratepayers its costs incurred pursuant to this article.
(c)The associated offtake obligation shall apply regardless of whether the equipment is utilized.
(d)A public utility shall not substitute alternative procurement mechanisms in lieu of participation in the Energy Units authorized procurement in a manner that undermines the demand signal to manufacturers.
12100.85.(a)The Energy Unit is authorized to issue requests for proposals or other competitive solicitations to procure electricity grid components based on the states aggregate purchasing needs for electricity grid components, as identified pursuant to subdivision (c) of Section 12100.83.
(b)In conducting procurement pursuant to subdivision (a), the Energy Unit shall prioritize all of the following:
(1)Cost and delivery timelines.
(2)In-state manufacturing and high road job creation.
(3)Capacity expansion.
(4)Supply chain resiliency.
(c)The Energy Unit shall evaluate whether the market can meet demand in a timely and cost-effective manner without supply-side intervention.
12100.86.(a)If the Energy Unit determines that supply is constrained or unreasonably costly, it may offer targeted incentives to suppliers that establish or expand manufacturing capacity within California.
(b)The Energy Unit shall develop a proposal to offer incentives, which may include any of the following:
(1)Bond financing through the California Infrastructure and Economic Development Bank, including for joint ventures.
(2)Low-cost loans or loan guarantees.
(3)Tax incentives administered through existing authorities.
(4)Site, permitting, or regulatory assistance.
(5)Advance purchase or demand backstop agreements.
(c)Incentives shall be conditioned on measurable public benefits, including in-state production, high road job creation, affordability, and capacity expansion.
(d)The Energy Unit shall issue one or more requests for qualifications to identify suppliers, original equipment manufacturers, or consortia that are qualified and willing to enter into production joint ventures with the state to manufacture critical grid components in California.
(e)A request for qualifications issued pursuant to this section shall solicit information, including, but not limited to, all of the following:
(1)Technical capability and manufacturing experience.
(2)Ability to design, construct, finance, and operate manufacturing facilities.
(3)Proposed production capacity and timelines.
(4)Workforce and high road job quality commitments.
(5)Financial capacity and proposed capital contributions.
(6)Identification of barriers to production that could be addressed through state financing, procurement commitments, or regulatory assistance.
(7)Pricing of finished products.
(f)The Energy Unit, after evaluating the responses to the request for qualifications, may do any of the following:
(1)Select one or more qualified suppliers to enter negotiations for production joint ventures.
(2)Invite selected respondents to submit detailed proposals or bids.
(3)Decline to proceed if market conditions improve.
(g)The Energy Unit is not obligated to enter into a joint venture or provide incentives to an entity that responds to a request for qualifications.
12100.87.(a)The Energy Unit is authorized to enter into production joint ventures with qualified private suppliers selected through the request for qualifications process described in Section 12100.86.
(b)Production joint ventures shall be structured to provide for all of the following:
(1)Shared ownership, equity stakes, or other legally permissible participation by the state.
(2)Establishment or expansion of manufacturing facilities within California.
(3)Lower cost for finished products as compared to prevailing market prices.
(c)Production joint ventures may be structured to provide for either or both of the following:
(1)Allocation of design, construction, financing, and operational responsibilities to the private partner.
(2)Use of special purpose vehicles to carry out joint venture activities.
(d)The Energy Unit may provide, subject to availability, all of the following:
(1)Bond financing through the California Infrastructure and Economic Development Bank, as provided in Section 12100.88.
(2)Low-cost loans or loan guarantees.
(3)Advance purchase commitments or mandatory offtake agreements.
(4)Site access, leasing of public land, or permitting assistance.
(e)Private suppliers or joint ventures shall submit operating plans that articulate how they will meet cost recovery and procurement goals of the Energy Unit.
(f)The Energy Unit shall ensure that production joint ventures are awarded through a transparent, competitive, and merit-based process, and are structured to protect public funds, ensure high road jobs, and deliver community benefits.
12100.88.The California Infrastructure and Economic Development Bank, on behalf of the Energy Unit, may issue revenue bonds to finance procurement and manufacturing of electricity grid components, as provided in Article 12 (commencing with Section 63049.80) of Chapter 2 of Division 1 of Title 6.7.
12100.89.(a)Upon application by the Energy Unit, the Public Utilities Commission shall approve recovery of costs incurred under this chapter from electric ratepayers.
(b)Recoverable costs may include procurement payments, bond repayment obligations, storage costs, and administrative expenses, net of any offsetting revenues.
(c)Cost recovery shall be subject to commission review for reasonableness, cost-effectiveness, and alignment with state energy policy.
12100.90.The Energy Unit shall submit an annual report to the Legislature detailing purchasing needs, procurements, manufacturing capacity added, ratepayer costs and savings, job benefits, and fiscal impacts related to the implementation of this article. The annual reports shall be submitted in compliance with Section 9795.
12100.91.If any provision of this article or its application is held invalid, that invalidity shall not affect other provisions or applications, which shall remain in full force and effect.
SEC. 3.Article 12 (commencing with Section 63049.80) is added to Chapter 2 of Division 1 of Title 6.7 of the Government Code, to read:12.California Electricity Grid Financing63049.80.For the purposes of this article, the following terms have the following meanings:
(a)Account means either of the following:
(1)The Manufacturing Incentive Account established pursuant to Section 63049.81.
(2)The Procurement Account established pursuant to Section 63049.81.
(b)California Grid Manufacturing Initiative means the California Grid Manufacturing Initiative established pursuant to Article 8 (commencing with Section 12100.80) of Chapter 1.6 of Part 2 of Division 3 of Title 2.
(c)Energy Unit means the Energy Unit created within the Governors Office of Business and Economic Development pursuant to Section 12100.110.
(d)Revolving fund means the California Grid Manufacturing Initiative Revolving Fund established pursuant to Section 63049.81.
63049.81.(a)There is hereby created the California Grid Manufacturing Initiative Revolving Fund in the State Treasury, and the Manufacturing Incentive Account and the Procurement Account within the revolving fund, for the purpose of providing financial assistance pursuant to the California Grid Manufacturing Initiative and, notwithstanding Section 13340, moneys in the revolving fund and the accounts are hereby continuously appropriated, without regard to fiscal years, to the Energy Unit for expenditure in accordance with the California Grid Manufacturing Initiative.
(b)Moneys generated for purposes of Section 12100.87, including proceeds from the sale of bonds to support manufacturing of electricity grid components pursuant to Section 63049.82, shall be deposited into the Manufacturing Incentive Account.
(c)Moneys generated for purposes of Section 12100.85, including proceeds from the sale of bonds to support the California Grid Manufacturing Initiatives procurement of electricity grid components and revenues generated from the sale of those components to public utilities, shall be deposited into the Procurement Account.
63049.82.(a)The bank, on behalf of the Energy Unit, may issue taxable or tax-exempt revenue bonds pursuant to Chapter 5 (commencing with Section 63070) to finance procurement and manufacturing of electricity grid components pursuant to the California Grid Manufacturing Initiative. The proceeds of the bonds shall be deposited into the respective accounts, as provided in Section 63049.81, and used exclusively for the purposes of the California Grid Manufacturing Initiative. Bond proceeds may also be used to fund necessary reserves, capitalized interest, or costs of issuance.
(b)Bonds issued under this article shall not be deemed to constitute a debt or liability of the state or of any political subdivision of the state or a pledge of the faith and credit of the state or of any political subdivision, other than the bank, but shall be payable solely from the revolving fund and the assets of the revolving fund, and the security provided by the revolving fund. All bonds issued under this article shall contain on the face of the bonds a statement to that effect.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Aug 13, 2026 | In committee: Held under submission. |
| Aug 3, 2026 | In committee: Referred to APPR. suspense file. |
| Jun 29, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 8. Noes 2.) (June 29). Re-referred to Com. on APPR. |
| Jun 25, 2026 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on B. P. & E.D. |
| Jun 24, 2026 | From committee: Do pass and re-refer to Com. on B. P. & E.D. (Ayes 13. Noes 3.) (June 24). Re-referred to Com. on B. P. & E.D. |
| Jun 10, 2026 | Referred to Coms. on E., U & C. and B. P. & E.D. |
| May 27, 2026 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 26, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 60. Noes 13. Page 5329.) |
| May 26, 2026 | Read third time. Passed. Ordered to the Senate. (Ayes 60. Noes 13.) |
| May 26, 2026 | Read third time. Passed. Ordered to the Senate. |
| May 18, 2026 | Read second time. Ordered to third reading. |
| May 14, 2026 | From committee: Do pass. (Ayes 12. Noes 2.) (May 14). |
| May 14, 2026 | Joint Rule 62(a), file notice suspended. (Page 5030.) |
| May 14, 2026 | Joint Rule 62(a), file notice suspended. |
| May 13, 2026 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| Apr 21, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 7. Noes 0.) (April 21). Re-referred to Com. on APPR. |
| Apr 14, 2026 | Re-referred to Com. on E.D., G., & H.I. |
| Apr 13, 2026 | Read second time and amended. |
| Apr 9, 2026 | From committee: Amend, and do pass as amended and re-refer to Com. on E.D., G., & H.I. (Ayes 15. Noes 1.) (April 8). |
| Mar 25, 2026 | Re-referred to Com. on U. & E. |
| Mar 24, 2026 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Mar 16, 2026 | Referred to Coms. on U. & E. and E.D., G., & H.I. |
| Feb 21, 2026 | From printer. May be heard in committee March 23. |
| Feb 20, 2026 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 3, 2026 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jun 29, 2026 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Business, Professions and Economic Development |
Passed |
|
| Jun 24, 2026 | Do pass, but first be re-referred to the Committee on [Business, Professions and Economic Development] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
|
| May 26, 2026 | AB 2516 Petrie-Norris Assembly Third Reading | Assembly Floor |
Passed |
|
| May 14, 2026 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 8, 2026 | Do pass as amended and be re-referred to the Committee on [Economic Development, Growth, and Household Impact] | Assembly Standing Committee on Utilities and Energy |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| BlueGreen Alliance | ** Support | |
| Building Decarbonization Action Fund | ** Support | |
| Building Decarbonization Coalition Action Fund | ** Support | |
| California Environmental Voters | ** Support | |
| California Federation of Labor Unions | ** Support | |
| California Forward | ** Support | |
| California Green New Deal Coalition | ** Support | |
| California Labor for Climate Jobs | ** Support | |
| Central Valley Community Foundation | ** Support | |
| Climate Action California | ** Support | |
| Climate Action Campaign | ** Support | |
| Coalition of California Utility Employees | ** Support | |
| Communication Workers of America, District 9 | ** Support | |
| Engineers and Scientists of California, IFPTE Local 20, AFL-CIO | ** Support | |
| Environmental Protection Information Center | ** Support | |
| IBEW Local 1245 | ** Support | |
| Industrious Labs | ** Support | |
| International Brotherhood Of Electrical Workers, Local 1245 | ** Support | |
| International Union, United Automobile, Aerospace, and Agricultural Implement Workers of America | ** Support | |
| jobs to move america | ** Support | |
| Los Angeles Alliance for a New Economy | ** Support | |
| Los Angeles Alliance for a New Economy (LAANE) | ** Support | |
| Omex Industries LLC | ** Support | |
| Pacific Gas and Electric | ** Against | |
| Public Citizen | ** Support | |
| Rising Sun Center for Opportunity | ** Support | |
| San Diego Gas & Electric | ** Against | |
| Sierra Club California | ** Support | |
| Southern California Edison | ** Against | |
| Sylvatex, Inc. | ** Support | |
| The Climate Center | ** Support | |
| The Environmental Protection Information Center | ** Support | |
| The Environmental Protection Information Center (EPIC) | ** Support | |
| The Utility Reform Network | ** Support | |
| United Steelworkers District 12 | ** Support |
SENATE COMMITTEE ON
Senator Sabrina Cervantes, Chair
2025 - 2026 Regular Session
AB 2516 (Petrie-Norris) - California Grid Manufacturing Initiative
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would establish the California Grid Manufacturing Initiative within the Energy Unit in the Governor's Office of Business and Economic Development (GO-Biz), in coordination with various state entities, to aggregate statewide demand, coordinate procurement, and incentivize in-state manufacturing of critical electricity grid components, as specified.
Fiscal Impact:
- GO-Biz estimates ongoing costs of $3.9 million in the first year and $900,000 annually thereafter (General Fund) to perform an industry and market assessment of grid component manufacturing and recommend appropriate forms of state assistance, facilitate bond financing, provide loans and conduct pre-bond work, monitor approved projects, provide regulatory and siting assistance, and coordinate the initiative's entities, among other things. Of this amount, $3 million would be one-time contract costs.
- IBank estimates ongoing costs of $1.6 million to $2.9 million annually (General Fund) to perform the functions required to issue revenue bonds, service loans until repayment or maturity, and handle loan workouts. IBank notes the range reflects uncertainty about market size, with the low end assuming relatively few suppliers seeking financing and the high end a large market of suppliers.
- IBank estimates one-time costs of $1.5 million (General Fund) for legal, financial, and engineering and feasibility consulting services to assess the current in-state manufacturing base, out-of-state manufacturers that might be incentivized to establish operations in California, and current and forecasted market needs, pricing dynamics, and supply chain status.
- IBank estimates that an initial funding appropriation of at least $500 million to $1 billion (General Fund) would be needed, whether to establish a bond to be used as leverage or to make direct loans, with the amount depending on the estimated size of the grid manufacturing pipeline within the state.
- Ongoing costs of an unknown but significant amount, possibly in the low millions of dollars annually, for the California Public Utilities Commission (CPUC) to implement the provisions of this bill. CPUC workload could include needing to develop a process to identify critical electricity grid components, assess the statewide need for those components over a 10-year period and update the assessment at least every five years, determine for each component whether to require electrical corporations to engage in joint procurement, review and approve projected purchasing needs, approve proposed joint purchase agreements, and administer cost recovery and ratepayer credits (ratepayer funds).
- To the extent that this bill impacts energy rates, it could result in costs or savings to the state as a ratepayer (various funds). The State of California is an electricity customer, purchasing roughly one percent of the electricity sold by the state's utilities. As such, the state incurs costs when rates increase, and realizes cost savings if rates go down. By authorizing the CPUC to allow recovery of costs incurred under the initiative that it finds just and reasonable, this bill could increase costs recovered in rates; by requiring the CPUC to ensure that savings below prevailing market prices are credited to ratepayers, it could also reduce costs recovered in rates.
Background:
California's grid expansion depends on components — transformers, conductors, switchgear, substation equipment — that have become scarce and expensive. Procurement runs utility by utility, financed through utility capital budgets and recovered in rates, with no state role in aggregating demand or supporting in-state manufacturing capacity. The state has recently established a related financing structure at GO-Biz, where the Energy Unit and IBank administer a continuously appropriated revolving fund for transmission projects.
Supply chain constraints and component costs. Demand for transformers in the United States has risen sharply while domestic production has not kept pace. Lead times for certain large power transformers reach two to four years, with reported backlogs well over 144 weeks and average timeframes around 125 weeks. Prices have increased roughly 45 to 95 percent since 2019, and demand for generator large step-up transformers rose 274 percent between 2019 and 2025. These conditions can delay transmission upgrades and the interconnection of generation and storage projects, and the resulting delays and costs ultimately affect ratepayers.
Fragmented procurement. Procurement in California is undertaken utility by utility, with each developing its own load forecasts, issuing its own solicitations, and executing its own contracts. Smaller and less predictable volumes may weaken utilities' negotiating position for capital-intensive, long-lead equipment, and variable specifications may require customized production runs that raise per-unit costs. The absence of coordinated forward-looking commitments may also constrain manufacturers' willingness to invest in expanded capacity.
The Transmission Infrastructure Accelerator. SB 254 (Becker, 2025) established the accelerator at GO-Biz, with the Energy Unit coordinating with the CPUC, CEC, CAISO, and IBank to develop a financing and development strategy for eligible transmission projects. The California Transmission Accelerator Revolving Fund sits in the State Treasury and is continuously appropriated, with IBank providing financing from it on the Energy Unit's behalf. The fund has two dedicated revenue sources: $325 million from Proposition 4, and 5 percent of electrical corporation consigned allowance revenues remitted under AB 1207 (Irwin, 2025), which Senate Budget Subcommittee No. 2 estimated could amount to roughly $120 million based on historical amounts, subject to CARB's pending cap-and-invest regulations. The accelerator is authorized until January 1, 2031. The Governor's Budget proposed $4.2 million from the fund and three limited-term positions for the Energy Unit to stand it up, within a broader package of 10 limited-term positions and roughly $25.7 million in program administration costs over five years across GO-Biz and IBank.
Revenue bond marketability. The IBank finances through taxable and tax-exempt revenue bonds, which are payable solely from identified revenue streams rather than the state's faith and credit. Marketability depends on that revenue stream.
Cost recovery for utility procurement. Section 451 of the Public Utilities Code requires that every charge demanded by a public utility be just and reasonable. Utility procurement of grid components is recovered in rates through general rate cases and other ratesetting proceedings, subject to the CPUC's review of whether the costs incurred were prudent.
Proposed Law:
This bill would:
- Require the Energy Unit within GO-Biz, in coordination with the CPUC, the State Energy Resources Conservation and Development Commission (CEC), the California Independent System Operator (CAISO), public utilities, and the California Infrastructure and Economic Development Bank (IBank), to establish the California Grid Manufacturing Initiative.
- Require the Energy Unit to determine and provide appropriate forms of state assistance to address identified delays with critical electricity grid components, to incentivize new or existing in-state manufacturing of electricity grid components, and to provide support to joint procurements.
- Require the CPUC, in consultation with the CEC and the CAISO, and in a new or existing proceeding, to develop a process to identify critical electricity grid components and to assess the statewide need for critical electricity grid components for the next 10-year period, as soon as practicable. Require the assessment to include identification of specific strategies to reduce delays and ratepayer costs associated with the procurement of critical electricity grid equipment. Require the CPUC, at least once every five years, to update the identification and assessment.
- Require the CPUC to determine, for each critical electricity grid component identified, whether requiring electrical corporations to engage in the joint procurement of that component would further the purposes of this bill, and authorize the CPUC, if it makes that determination and also determines that electrical corporations would benefit from the joint procurement, to require electrical corporations to engage in a joint procurement to fulfill the projected purchasing needs of each participating electrical corporation, as provided. Authorize a local publicly owned electric utility to participate in the joint procurement with the electrical corporations.
- State that, if electrical corporations are required to engage in a joint procurement of critical electricity grid components, as specified, not more than 12 months following the imposition of the requirement, the electrical corporations must take various mandatory steps.
- Authorize the CPUC to authorize recovery of costs incurred under the initiative only to the extent it determines those costs are just and reasonable, cost effective, and aligned with state energy policy, and require the CPUC, to the extent a joint procurement results in costs below prevailing market prices, to ensure that the difference is credited to ratepayers.
- Authorize the Energy Unit to provide assistance to projects that establish or expand manufacturing capacity in California for critical electricity grid components, including:
Engaging local public and private actors relevant to project development success.
Supporting the applicant's efforts to secure necessary permits and other relevant authorities.
Leveraging and coordinating relevant state incentives and supply chain facilitation services to ensure timely and cost-effective acquisition of physical components of the project.
- Require assistance to be conditioned on measurable public benefits, including high road job creation, community benefits, workforce development, affordability, and capacity expansion. Require the Energy Unit to evaluate projects based on:
The extent to which the project will further the state's clean energy goals, including by reducing delays and costs.
The extent to which the project will create long-term high road employment in California.
- Authorize the Energy Unit to enter into production joint ventures with qualified private suppliers, as provided, and to provide:
Low-cost loans, credit enhancements, bond financing, or any other form of financial assistance through IBank.
Advance purchase commitments or mandatory offtake agreements.
Site access, leasing of public land, or permitting assistance.
Any other incentives determined by the Energy Unit.
- Require the Energy Unit to ensure that production joint ventures are awarded through a transparent, competitive, and merit-based process and structured to protect public funds, and to adopt conflict-of-interest policies governing employees and contractors involved in procurement decisions and joint venture negotiations, in accordance with the Political Reform Act of 1974.
- Create the California Grid Manufacturing Initiative Revolving Fund in the State Treasury for the purpose of providing financial assistance pursuant to the initiative, and make the moneys in the revolving fund continuously appropriated for expenditure in accordance with the initiative, thereby making an appropriation.
- Authorize IBank, on behalf of the Energy Unit, to issue revenue bonds to finance procurement and manufacturing of critical electricity grid components, and to provide financial assistance, including from the proceeds of those bonds, to a participating party, as defined, in connection with the financing or refinancing of a project to establish or expand manufacturing capacity for critical electricity grid components. Require the proceeds of any bonds to be deposited into the revolving fund and used exclusively for the purposes of the initiative.
- Require IBank to meet and confer with the Energy Unit for eligible projects, and provide that final authority to provide financial support to an eligible project resides with the Energy Unit.
Related Legislation:
SB 787 (McNerney, 2025) would have established a formal interagency memorandum of understanding framework and a Senior Counselor on Industrial Policy and Clean Energy Development at the CEC to coordinate California's clean energy supply chain development efforts across the battery, offshore wind, and building decarbonization sectors. The bill was vetoed.
SB 254 (Becker, 2025) established the California Transmission Infrastructure Accelerator at GO-Biz, requiring the Energy Unit, in coordination with the CPUC, the CEC, the CAISO, and IBank, to develop a financing and development strategy for eligible transmission projects. The bill created the California Transmission Accelerator Revolving Fund in the State Treasury, continuously appropriated for the support of eligible entities, and authorized IBank to provide financing from it. The program is authorized until January 1, 2031.
AB 1373 (E. Garcia, 2023) authorized the state to use the Department of Water Resources to centrally procure long lead-time clean energy resources, such as offshore wind and geothermal energy, to meet 2045 climate goals and ensure grid reliability.
SB 1174 (Hertzberg, 2022) required the CPUC to publish, in its annual RPS reports, a systemwide assessment of transmission project delays and their impact on in-development resources, work carried out through the interagency Tracking Energy Development Task Force of the CPUC, CEC, CAISO, and GO-Biz.
SB 852 (Pan, 2020) enacted the California Affordable Drug Manufacturing Act, directing the state to enter manufacturing and procurement partnerships that leverage California's purchasing power to address shortages and high prices in a concentrated market.
Staff Comments:
Seed money. According to IBank, "an initial funding appropriation from the General Fund of at least $500 million to $1 billion would be needed depending on the estimated size of the grid manufacturing pipeline within the state.” IBank reports that this bill identifies no source of repayment for the revenue bonds it would authorize. Should repayment depend on the sale of grid components, IBank indicates that the bonds would amount to an aggregation of corporate sales, which investors would likely regard as speculative. Without identified revenue as the repayment source, IBank anticipates that bonds would be difficult to sell, which would eliminate the use of leverage and leave the Energy Unit and IBank to lend only from the corpus of any appropriated funds. If revenue bonds cannot be issued, IBank indicates that a significant General Fund appropriation would be needed to provide financial support, and that even where bonds could be issued, an appropriation would likely still be necessary to serve as credit enhancement and bolster investor confidence in a new program. IBank concludes that an initial General Fund appropriation of at least $500 million to $1 billion would be needed whether to establish a bond to be used as leverage or to make direct loans, with the amount depending on the estimated size of the grid manufacturing pipeline within the state. That figure rests on a desktop analysis of CAISO historical capital expenditure, with assumptions made to segment out transformer, substation, and switchgear infrastructure within CAISO-approved projects; IBank notes that a market and feasibility study would provide greater clarity on supply and demand forecasts and on the resulting funding estimate.
State mandate. Because this bill's provisions would become part of the Public Utilities Act, and a violation of a CPUC action implementing them would be a crime, this bill would impose a state-mandated local program. No reimbursement would be required because the only costs a local agency or school district would incur would result from this bill expanding the scope of an existing crime, within the meaning of Section 17556 of the Government Code.
-- END --
SENATE COMMITTEE ON
BUSINESS, PROFESSIONS AND ECONOMIC DEVELOPMENT
Senator Dr. Aisha Wahab, Chair
2025 - 2026 Regular
Bill No: Hearing Date: June 29, 2026
Author: | |||
Version: |
| ||
Urgency: | Fiscal: | ||
Consultant: | |||
Subject:
SUMMARY:
Establishes the California Grid Manufacturing Initiative (Initiative) within the Energy Unit in the Governor’s Office of Business and Economic Development (Go-Biz), in coordination with various state entities, as specified, to aggregate statewide demand, coordinate procurement, and incentivize in-state manufacturing of critical electricity grid components.
NOTE: This bill was heard in the Senate Committee on Energy, Utilities and Communications on June 24, 2026, and passed on a 13-3 vote.
Existing law:
- Establishes the Governor’s Office of Business and Economic Development (GO-Biz) within the Governor’s Office for the purpose of serving as the lead state entity for economic strategy and marketing of California on issues relating to business development, private sector investment and economic growth. (Government Code (GC) §§ 12096-12098.5)
- Establishes the Bergeson-Peace Infrastructure and Economic Development Bank Act and creates the IBank. (GC § 63000 et.seq.)
- Authorizes the IBank to make loans, issue bonds, and provide financial assistance for economic development and public development facilities. (GC § 63050 et.seq.)
- Creates the Energy Unit within GO-Biz to accelerate the planning, financing, and execution of critical energy infrastructure projects that are necessary for the state to reach its climate, energy, and sustainability policy goals. (GC § 12100.110)
This bill:
- Requires the Energy Unit in coordination with the PUC, the State Energy Resources Conservation and Development Commission also known as the California Energy Commission (CEC), the California Independent System Operator (CAISO), public utilities, and the California Infrastructure and Economic Development Bank (IBank), to establish the California Grid Manufacturing Initiative.
- Requires the Energy Unit to determine and provide appropriate forms of state assistance to address identified delays with critical electricity grid components, to incentivize new or existing in-state manufacturing of electricity grid components, and to provide support to joint procurements.
- Requires PUC, in consultation with the CEC and the CAISO, and in a new or existing proceeding, to develop a process to identify critical electricity grid components and to assess the statewide need for critical electricity grid components for the next 10-year period, as soon as practicable. Requires the assessment to include identification of specific strategies to reduce delays and ratepayer costs associated with the procurement of critical electricity grid equipment. Requires PUC, at least once every five years, to update the identification and assessment.
- States that, if electrical corporations are required to engage in a joint procurement of critical electricity grid components, as specified, not more than 12 months following the imposition of the requirement, the electrical corporations must take various mandatory steps. Authorizes the Energy Unit to provide assistance to projects that establish or expand manufacturing capacity in California for critical electricity grid components that includes but is not limited to engaging local public and private actors relevant to project development success; supporting efforts of the project applicant to secure necessary permits and other relevant authorities and; leveraging and coordinating all relevant state incentives and supply chain facilitation services to ensure timely and cost-effective acquisition of physical components of the project. Requires the Energy Unit to evaluate projects based the extent to which the project will further the state’s clean energy goals, including by reducing delays and costs and the extent to which the project will create long-term high road employment in California. Requires Energy Unit assistance to be conditioned on measurable public benefits, including high road job creation, community benefits, workforce development, affordability, and capacity expansion.
- Authorizes the Energy Unit to provide low-cost loans, credit enhancements, bond financing, or any other form of financial assistance through the IBank; advance purchase commitments or mandatory offtake agreements; site access, leasing of public land, or permitting assistance and; any other incentives determined by the Energy Unit. Requires the Energy Unit to ensure that production joint ventures are awarded through a transparent, competitive, and merit-based process, and are structured to protect public funds, ensure high road jobs, and deliver community benefits. Requires the Energy Unit to adopt conflict-of-interest policies governing employees and contractors involved in procurement decisions and joint venture negotiations, in accordance with the conflict-of-interest provisions of the Political Reform Act of 1974.
- Requires the Energy Unit to submit an annual report to the Legislature detailing its efforts undertaken in support of the Initiative, manufacturing capacity added, ratepayer costs and savings, job benefits, and fiscal impacts.
- Creates the California Grid Manufacturing Initiative Revolving Fund in the State Treasury to provide financial assistance for the initiative, moneys in the revolving fund are to be continuously appropriated, without regard to fiscal years, for expenditure in accordance with the initiative.
- Authorizes IBank, on behalf of the Energy Unit, to provide financial assistance in connection with projects that establish or expand manufacturing capacity in California for critical electricity grid components. Authorizes IBank, on behalf of the Energy Unit, to issue taxable or tax-exempt revenue bonds to finance procurement and manufacturing of critical electricity grid components pursuant to the Initiative.
- Makes findings and declarations about the following:
- California’s electric system depends on timely access to large power transformers, distribution transformers, and other critical electricity grid components to ensure reliability, affordable rate, wildfire resilience, emergency response and the achievement of the state’s clean energy goals.
- National and global supply chain constraints have resulted in extended lead times, elevated costs, and limited availability of critical electricity grid components.
- Fragmented procurement and uncoordinated demand signaling by utilities and public agencies can increase market uncertainty and may inhibit investment in manufacturing capacity.
- Coordinated demand aggregation, centralized procurement, advance market commitments, and targeted manufacturing incentives can reduce risk, lower costs, and expand supply for critical electricity grid components that are forecast in California energy planning processes.
- In certain circumstances, market forces alone are insufficient to ensure adequate and timely supply, necessitating state-enabled intervention, including public-private partnerships.
- Increased in state-manufacturing of critical electricity grid components holds the potential to supply a significant base of high-skill, high-paying jobs in California and equip the electrical grid for mass electrification.
FISCAL EFFECT:
According to the Assembly Committee on Appropriations, the Energy Unit notes it has neither experience with nor expertise in the type of program this bill directs it to create. The Energy Unit identifies one-time costs unique to the first year as a $2 million General Fund contract with an outside consultant to assess short-term and long-term needs for critical grid components, develop a study of the industry and market, and make recommendations. In addition, the Energy Unit anticipates costs in that first year and each year thereafter of $960,000 (GF) for seven positions – a manager, five program analysts and an attorney – and a contract with an outside market advisor. The IBank notes it does not know the size of the market for electricity gird components procurement or manufacturing this bill authorizes it to finance. For this reason, IBank provides a low-end estimate of annual implementation costs, $1.62 million (GF) for seven positions, and a high-end estimate of those costs, $2.88 million (GF) for 13 positions. The IBank concludes it will also incur one-time costs of $1.5 million (GF) for a contract with an outside consultant to study the current California manufacturing base and out-of-state manufacturers that might establish operations in California in response to the CGM Initiative. In addition, the IBank concludes it will need to obtain an initial funding appropriation of $500 million to $1 billion (GF or some other source) to be used as leverage to secure outside funding or for direct loans.
COMMENTS:
- Purpose. This bill is sponsored by the Author. According to the Author, “California’s electricity grid faces a supply chain crisis that is driving up costs for families, delaying critical renewable energy projects, and undermining our climate goals. National and global bottlenecks for essential grid equipment, particularly transformers, have caused lead times to stretch from weeks to years and prices to spike as much as 95 percent. AB 2516 establishes the California Grid Manufacturing Initiative to aggregate, statewide demand, coordinate procurement, and incentivize in-state manufacturing., thereby lowering costs, creating thousands of high-road jobs, and positioning California as a national leader in building the grid infrastructure our clean energy demands.”
- Background. According to the U.S. Government Accountability Office’s 2023 report, Electricity Grid: DOE Could Better Support Industry Efforts to Strengthen the Supply Chain for Large Power Transformers, utilities face challenges obtaining large power transformers because of supply chain constraints, limited domestic manufacturing capacity, dependence on foreign suppliers, and long production lead times. GAO found that transformer availability affects grid resilience because large power transformers are difficult to replace quickly and are essential to transmitting electricity across the grid.
According to the U.S. Department of Energy’s 2023 National Transmission Needs Study, expanding transmission infrastructure could improve electric reliability, increase system resilience, and support growing electricity demand and the integration of new generation resources.
According to the CEC and PUC’s 2026 Joint Agency Reliability Planning Assessment, which relies on the 2024 Integrated Energy Policy Report Update Planning Forecast, annual electricity demand and summer peak demand are projected to increase substantially through 2034. The report projects that California's peak electricity demand, the times when the most electricity is needed at once, will increase from about 46,000 megawatts in 2025 to 59,000 megawatts in 2034, driven primarily by electric vehicles, electrification of homes and buildings, and new data centers. The report also notes that meeting future reliability needs will require continued procurement of new energy resources while addressing permitting, financing, and supply chain challenges.
According to the California Council on Science and Technology’s 2025 report, Key Challenges for California’s Energy Future, California's transition to a clean energy economy will require continued investment in transmission infrastructure, grid modernization, permitting, manufacturing capacity, and supply chain resilience. The report notes that achieving the state’s energy goals depends not only on developing new energy resources, but also on building the infrastructure needed to deliver electricity reliably.
GO-Biz. In February 2010, the Little Hoover Commission undertook a review of the state's economic and workforce development programs. In its final report, Making up for Lost Ground: Creating a Governor's Office of Economic Development, it analyzed the status and effectiveness of current programs since the 2003 demise of the Technology, Trade and Commerce Agency and recommended the creation of a new governmental entity to fill the void left by the dismantled agency.
The report called for a single entity that would promote greater economic development, foster job creation, serve as a policy advisor and deliver specific services (i.e., permitting, tax, regulatory, and other information) directly to the California business community. In April 2010, Governor Schwarzenegger issued Executive Order S-05-10 as a means to operationalize the report recommendations including the creation of the Governor's Office of Economic Development (GOED).
In October 2011, the Governor signed AB 29 (John A. Pérez, Chapter 475, Statutes of 2011), which effectively codified GOED and changed its name to GO-Biz. Since its inception, the office has served thousands of businesses, 95 percent of which are small businesses. The most frequent types of assistance include help with permit streamlining, starting a business, relocation and expansion of businesses, and regulatory challenges.
In March 2012, Governor Brown initiated a reorganization process to realign the state's administrative structure. Key changes include dismantling of the Business, Transportation and Housing Agency and the shifting of a number of key programs to GO-Biz including the Small Business Loan Guarantee Program, the California Travel and Tourism Commission, the California Film Commission, the Film California First Program, and the Infrastructure and Economic Development Bank (IBank). Currently, GO-Biz administers the following programs and units:
- Made In California program for the purpose of encouraging consumer product awareness and to foster the purchases of products manufactured in California.
- The California Inclusive Innovation Hub Program (iHub2) to incubate and/or accelerate technology and science-based firms, with a focus on underserved regions and communities.
- The California Competes Tax Credit Program under which “businesses who want to come to California or stay and grow in California” can receive an income tax credit.
- The California Business Investment Services Unit, which provides no-fee, tailored site selection services to employers and others who may be considering California for relocation or expansion.
- The California Business Portal, which provides information to California businesses about common questions, permitting, financial options, and more.
- The California Community Reinvestment Grants Program, which was included in Proposition 64, authorized GO-Biz to award grants to local health departments and certain nonprofit organizations to support communities disproportionately affected by the War on Drugs.
- Office of the Small Business Advocate which provides information and assistance to small businesses.
- The Zero Emission Vehicles (ZEV) Infrastructure Unit which works to accelerate the deployment of ZEV infrastructure.
- The International Affairs and Business Development Unit, which serves as California’s primary point of contact for expanding international trade and investment relations. This unit focuses on foreign direct investment (services for foreign investors, foreign investment technical assistance, and the EB-5 Investor Visa Program), international trade promotion (STEP program, trade missions, export assistance, and the California-China Trade Office), and international agreements.
In 2022, GO-Biz established the Community and Place-Based Solutions Team (Team) to support local governments, non-profits, community-based organizations, colleges and universities, and other economic development partners in their community development needs. The Team provides key technical assistance for community and economic development planning. According to the Team’s website, place-based economic development strategies are initiatives to encourage economic and community development activity in defined geographic areas. Many communities have started emphasizing place-based strategies to strengthen hyperlocal activities around physical place, economic conditions and social infrastructure. Place-based economic development strategies include a variety of approaches to incentivize investment in disadvantaged communities, including funding for infrastructure & public facilities, job creation & workforce development, affordable & workforce housing, and more.
IBank and Infrastructure Financing. According to its website, the California Infrastructure and Economic Development Bank (IBank) was created in 1994 to finance public infrastructure and private development projects that promote economic development and improve quality of life in California communities. Located within GO-Biz, IBank has authority to issue taxable and tax-exempt revenue bonds, provide financing to public agencies, provide credit enhancements, acquire or lease facilities, and leverage state and federal funds. Current programs include the Infrastructure State Revolving Fund Loan Program, California Lending for Energy and Environmental Needs Center, Climate Catalyst Revolving Loan Fund, Small Business Finance Center, and Bond Financing Program.
- Arguments in Support. Supporters contend that the bill presents a pragmatic and forward-looking strategy to address escalating equipment costs, severe supply chain bottlenecks, and the need to modernize aging infrastructure. Achieving the state’s climate targets, maintaining reliability, and protecting ratepayers requires unprecedented investment in grid infrastructure. Supporters note that the initiative achieves these goals by combining centralized procurement with investments in domestic manufacturing capacity, by leveraging bulk purchasing, unit costs reduce, and with long-term demand production expands. The authorization of public-private joint ventures when supply shortages or excessive costs persist help establish or expand California-based manufacturing facilities, increasing production capacity while strengthening competition in the market. Additionally, the utilization of self-sustaining financing models leverages lower-cost public financing tools while protecting the state’s General Fund. Lastly, by improving supply availability, reducing price inflation, and accelerating grid deployment, the initiative is projected to generate approximately $40 billion in ratepayer savings by 2040 with cumulative savings potentially reaching $217 billion by 2050. In addition to lowering costs, the initiative would support economic development and workforce opportunities. The initiative is projected to create 12,500 full-time jobs, including approximately 5,000 high-road manufacturing jobs that provide family-sustaining wages and strong labor standards.
SUPPORT AND OPPOSITION:
Support:
Bluegreen Alliance
Building Decarbonization Action Fund
Building Decarbonization Coalition Action Fund
California Environmental Voters
California Federation of Labor Unions
California Forward
California Forward
California Green New Deal Coalition
California Labor for Climate Jobs
Central Valley Community Foundation
Climate Action California
Climate Action Campaign
Coalition of California Utility Employees
Communication Workers of America, District 9
Engineers and Scientists of California, IFPTE Local 20, AFL-CIO
Environmental Protection Information Center
IBEW Local 1245
Industrious Labs
International Brotherhood of Electrical Workers, Local 1245
International Union, United Automobile, Aerospace, and Agricultural Implement Workers of America
Jobs to Move America
Los Angeles Alliance for a New Economy
Public Citizen
Rising Sun Center for Opportunity
Sierra Club California
Sylvatex, INC.
The Climate Center
The Environmental Protection Information Center
The Utility Reform Network
United Steelworkers District 12
Opposition:
None received
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Benjamin Allen, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 6/24/2026
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill creates the California Grid Manufacturing Initiative to aggregate demand for and centralize procurement of critical electricity grid components and to provide financial assistance to projects that manufacture such components in California, among other requirements.
ANALYSIS:
Existing law:
- Establishes the California Public Utilities Commission (CPUC) and authorizes it to regulate public utilities, including electrical corporations. (Article 12 of the California Constitution)
- Establishes the Governor’s Office of Business and Economic Development (GO-Biz) within the Governor’s office and requires GO-Biz to serve the Governor as the lead entity for economic strategy and the marketing of California on issues relating to business development, private sector investment, and economic growth. (Government Code §12100.50 et seq.)
- Creates within GO-Biz the Energy Unit to accelerate the planning, financing, and execution of critical energy infrastructure projects, as specified. (Government Code §12100.110)
- Establishes, pursuant to the Bergeson-Peace Infrastructure and Economic Development Bank Act, the California Infrastructure and Economic Development Bank (I-Bank) within GO-Biz and, among other things, authorizes the I-Bank to make loans, issue bonds, and provide financial assistance for various types of projects that qualify as economic development or public development facilities, as provided. (Government Code §63000 et seq.)
- Defines a “local publicly owned electric utility (electric POU)” to mean a municipality or municipal corporation operating as a “public utility” furnishing electric service as provided in Section 10001, a municipal utility district furnishing electric service formed pursuant to Division 6 (commencing with Section 11501), a public utility district furnishing electric services formed pursuant to the Public Utility District Act set forth in Division 7 (commencing with Section 15501), an irrigation district furnishing electric services formed pursuant to the Irrigation District Law set forth in Division 11 (commencing with Section 20500) of the Water Code, or a joint powers authority that includes one or more of these agencies and that owns generation or transmission facilities, or furnishes electric services over its own or its member’s electric distribution system. (Public Utilities Code §224.3)
- Establishes the policy that all of the state's retail electricity be supplied with a mix of Renewables Portfolio Standard (RPS)-eligible and zero-carbon resources by December 31, 2045, for a total of 100% clean energy. (Public Utilities Code § 454.53)
This bill:
- Requires the Energy Unit, in coordination with other specified state entities, to establish the California Grid Manufacturing Initiative.
- Requires the Energy Unit to identify and procure critical electricity grid components, as defined, and to incentivize new or existing in-state manufacturing of electricity grid components.
- Requires the Energy Unit to develop a process for each public utility, as defined, on or before January 1, 2028, and regularly thereafter, to submit a projection of its purchasing needs for critical electricity grid components for which the public utility has not entered into a purchase agreement and for which the public utility affirmatively seeks the assistance of the Energy Unit in coordinating resources and leveraging purchasing power.
- Provides that, if the Energy Unit determines that centralized procurement is warranted for a critical electrical grid component, a participating public utility may, prior to the issuance of a solicitation by the Energy Unit for that component, submit to the Energy Unit the conditions under which the public utility commits to purchase those components from the initiative, as provided. Under this bill, if a procurement by the Energy Unit satisfies the conditions submitted by a public utility, the public utility’s commitment to purchase the component from the initiative would be binding, as provided. By imposing new duties on local publicly owned electric utilities, this bill would impose a state-mandated local program.
- Authorizes the Energy Unit to issue requests for proposals or other competitive solicitations to procure critical electricity grid components, as provided, and would authorize the Energy Unit to provide financial assistance to projects that establish or expand manufacturing capacity in California for electrical grid components, as specified. This bill would also authorize the Energy Unit to enter into production joint ventures with qualified private suppliers, as provided, and to provide bond financing and other assistance.
- Authorizes the CPUC to authorize the recovery of costs incurred under the initiative only to the extent it determines those costs are just and reasonable, cost-effective, and aligned with state energy policy, as provided. To the extent the procurement results in costs below prevailing market prices for grid components, this bill would require the commission to ensure that the difference is credited to ratepayers, as provided.
- Creates the California Grid Manufacturing Initiative Revolving Fund in the State Treasury, and the Manufacturing Incentive Account and the Procurement Account within the revolving fund, for the purpose of providing financial assistance pursuant to the initiative. Makes the moneys in the revolving fund continuously appropriated for expenditure in accordance with the initiative. Authorizes the I-Bank, on behalf of the Energy Unit, to issue revenue bonds to finance procurement and manufacturing of electricity grid components, and would require the proceeds of the bonds to be deposited into the respective accounts and used exclusively for the purposes of the initiative. Makes an appropriation by establishing a continuously appropriated fund.
Background
Grid infrastructure build-out. California’s electric grid is expanding to meet the state’s clean energy and electrification goals, replace aging infrastructure, and support reliability and wildfire resilience. This effort requires significant investment in both transmission and distribution systems, along with a steady supply of critical electricity grid components such as transformers, conductors, switchgear, and other transmission and distribution equipment, including substation components. This is in addition to the normal upgrades needed to maintain the current electrical grid system, including addressing damages from storms and other natural disasters and the natural end of life of aging infrastructure. These components are essential to bringing new generation online, upgrading existing distribution and transmission infrastructure, and ensuring the electrical grid operates safely and reliably. For example, large step-up transformers are used to move electricity over long distances, while step down distribution transformers deliver power to homes and businesses. These generally have a 40-year average life. In 2014, the U.S. Department of Energy (DOE) report estimated that the average age of these large power transformers in the country’s electrical grid was 38-40 years. Conductors and transmission lines must also be upgraded or reconductored to carry increasing loads. In addition, substation equipment and switchgear are necessary to manage and control the flow of electricity across the system. Given the scale of planned upgrades, maintaining a consistent and reliable supply of these components will be critical to keeping generation interconnection, distribution, and transmission projects on track.
Supply chain constraints. The supply of critical electricity grid components remains constrained due to global supply chain disruptions, limited manufacturing capacity, and growing demand from electrification and new generation development. Demand for transformers in the United States has increased significantly in recent years, while domestic production capacity has not kept pace, contributing to extended lead times that can reach two to four years for certain large power transformers. Wood Mackensie reported that demand for generator large step-up transformers has increased 274% between 2019 and 2025. Current backlogs have been reported to be well over 144 weeks with average time frames reported at 125 weeks (well over 2 years).[1] Utilities have reported delays in obtaining large power transformers needed for transmission projects, as well as distribution transformers required for system upgrades and new customer connections. At the same time, prices for this equipment have risen substantially, with industry data showing increases of roughly 45 to 95 percent since 2019.[2] These conditions can delay transmission upgrades and, in turn, delay the interconnection of renewable energy and storage projects. As a result, limited availability of critical grid components continues to affect both the timing and cost of grid development which ultimately affect ratepayers.
Utility specific procurement of electrical grid components. Procurement of critical grid components in California is primarily undertaken on a utility-specific basis, with each utility independently developing load forecasts, issuing solicitations, and executing contracts. This decentralized approach results in fragmented and often intermittent demand, which can limit opportunities to consolidate purchasing, standardize specifications, and provide the long-term certainty needed to support domestic manufacturing. This can have implications for market outcomes. Smaller, less predictable procurement volumes may weaken utilities’ negotiating position with suppliers, particularly for capital-intensive, long-lead-time equipment such as large power transformers, circuit breakers, and high-voltage cables. Variability in utility specifications may also necessitate customized production runs, increasing per-unit costs and reducing the efficiencies associated with standardized manufacturing. Additionally, the absence of coordinated, forward-looking procurement commitments at a statewide level may constrain manufacturers’ willingness to invest in expanded production capacity or new facilities, given the significant capital investment required for grid equipment manufacturing.
GO-Biz/Energy Unit. The California GO-Biz serves as the state’s lead entity for economic development and supports businesses and project developers in navigating state requirements, particularly for projects involving multiple agencies or jurisdictions. Within GO-Biz, the Energy Unit focuses on energy and infrastructure projects, including renewable generation, energy storage, and transmission. The unit coordinates with the CPUC, California Energy Commission (CEC), and California Independent System Operator (CAISO), as well as local governments and utilities, with a focus on permitting and project timelines. The Energy Unit has supported implementation of the state’s Clean Energy Permitting Playbook, which outlines actions to improve interagency coordination and streamline permitting for clean energy and transmission projects. It is also been involved in efforts related to the Transmission Accelerator, which, pursuant to SB 254 (Becker, Chapter 119, Statutes of 2025) is intended to facilitate financing and cost recovery for transmission projects, helping address financing and cost recovery challenges associated with large, capital-intensive infrastructure. Together, these efforts are intended to help reduce delays in bringing grid infrastructure online, including projects dependent on long-lead equipment such as transformers.
Comments
Need for this bill. According to the author:
California’s electricity grid faces a supply chain crisis that is driving up costs for families, delaying critical renewable energy projects, and undermining our climate goals. National and global bottlenecks for essential grid equipment, particularly transformers, have caused lead times to stretch from weeks to years and prices to spike as much as 95 percent. These cost increases are passed directly to ratepayers and will continue to compound for decades. AB 2516 establishes the California Grid Manufacturing Initiative to aggregate statewide demand for grid components, coordinate procurement to achieve economies of scale, and incentivize in-state manufacturing through public-private joint ventures, thereby lowering costs, creating thousands of high-road manufacturing jobs, and positioning California as a national leader in building the grid infrastructure our clean energy future demands.
Bill attempts for the state to help resolve global supply challenges with electric grid components. This bill is intended to help resolve supply backlogs and shortages of critical electrical grid components needed to upgrade and expand the electrical transmission and distribution grid. There has been longstanding attention to the shortages, particularly for large transformers, predating the COVID-19 epidemic. However, the epidemic further affected supply constraints and the increasing demand for electrification and load, as well as the need to replace aging infrastructure and need to rebuild from the impacts of disasters (including hurricanes, fires, earthquakes, etc.) have exacerbated the supply constraints. As noted above, transformers, in particular, have seen an increase in demand. During President Biden Administration the Infrastructure Investment and Jobs Act required the DOE to provide a report to Congress regarding the status and opportunities to address supply issues for large transformers. This requirement followed on a 2017 DOE report exploring a federal reserve for transformers which recommended a non-government reserve driven by industry actions given the complexity of supply chains and procurement. The DOE published the new report in June 2024 to address concerns about large transformer vulnerabilities and strengthen the resilience of the U.S. grid and enabling rapid recovery from extensive transformer failures. In the 2024 report the DOE recommended continued engagement with industry stakeholders, including convenings to explore additional options in addition to additional research and development to explore novel concepts, flexible systems (such as mobile transformers), and other assessment recommendations from the Infrastructure Investment and Jobs Act list, such as focusing on the storage and security of recovery transformers and encouraging domestic manufacturing or expansion of existing transformer facilities.[3]
This bill seeks to have the state to procure needed electrical system components. As currently drafted, this bill would require the Energy Unit at Go-Biz to play a central role in identifying and procuring needed electrical components that might be critical to upgrading the electrical system. The Energy Unit would work with utilities, POUs and investor-owned utilities (IOUs), to identify needed components and require central procurement of critical components. Given some of the challenges for action at the federal level, the proponents of this bill seek state action to help address supply challenges. They look to New York City Housing Authority’s efforts to leverage the scale and standardization of its portfolio to create large, predictable demand that attracts manufacturing investment to address public housing needs. While utilities have not opposed this bill, they have relayed appreciation for the efforts to help address supply issues, but they also have concerns about the state involving itself directly in procuring electrical components. Given the individual and customized components, as well as their existing supply relationships, they express concern that direct state involvement in procurement could further hamper supply shortages and affect existing relationships for products. The author’s office also acknowledges the potential limits of such involvement. To that effect, the author and committee may wish to recast the portion of this bill regarding procurement, specifically delete requirements on the state to conduct direct procurement, and instead require the CPUC to work with electrical corporations and the Energy Unit to identify critical components and, if necessary, direct electrical corporations to procure needed supplies should such an effort help reduce supply shortages. The author and committee may wish to authorize POUs to participate in joint procurement with electrical corporations if they elect to do so. In general, the amendments would retain the Energy Unit’s and I-Bank’s role to support manufacturing of electrical components, but add provisions, including leveraging state and federal incentives, opportunities for low-cost loans and other financing assistance.
Dual Referral. Should this bill be approved by this committee, it will be re-referred to the Senate Business, Professions and Economic Development Committee.
Prior/Related Legislation
SB 787 (McNerney, 2025) establishes a formal interagency memorandum of understanding framework and a Senior Counselor on Industrial Policy and Clean Energy Development at the CEC to coordinate California's clean energy supply chain development efforts across batteries, offshore wind, and building decarbonization sectors. The bill was vetoed.
AB 1373 (E. Garcia, Chapter 367, Statutes of 2023) authorized California to use the Department of Water Resources to centrally procure long lead-time clean energy resources, such as offshore wind and geothermal energy, to meet 2045 climate goals and ensure grid reliability.
SB 1174 (Hertzberg, Chapter 229, Statutes of 2022) required the CPUC to publish, in its annual RPS reports, a systemwide assessment of transmission project delays and their impact on in-development resources, work carried out through the interagency Tracking Energy Development Task Force of the CPUC, CEC, CAISO, and GO-Biz.
SB 852 (Pan, Chapter 207, Statutes of 2020) enacted the California Affordable Drug Manufacturing Act, directing the state to enter manufacturing and procurement partnerships that leverage California’s purchasing power to address shortages and high prices in a concentrated market.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
BlueGreen Alliance
Building Decarbonization Coalition Action Fund
California Environmental Voters
California Federation of Labor Unions
California Forward
California Green New Deal Coalition
California Labor for Climate Jobs
Central Valley Community Foundation
Climate Action California
Climate Action Campaign
Coalition of California Utility Employees
Communication Workers of America, District 9
Environmental Protection Information Center
Industrious Labs
International Brotherhood of Electrical Workers, Local 1245
Jobs to Move America
Los Angeles Alliance for a New Economy
Public Citizen
Rising Sun Center for Opportunity
Sierra Club California
Sylvatex, Inc.
UAW Region 6
United Steelworkers District 12
OPPOSITION:
None received
ARGUMENTS IN SUPPORT: The coalition of supporters for the bill, including California Labor for Climate Jobs, the BlueGreen Alliance, and others state:
Across the state, working people, businesses, and local governments are grappling with rapidly rising electricity costs. At the same time, utilities face growing challenges in procuring essential grid equipment – particularly electrical transformers – needed to maintain reliability, prevent wildfires, and connect new renewable energy resources. AB 2516 addresses these challenges through a coordinated statewide procurement and manufacturing strategy designed to reduce costs, accelerate grid upgrades, and expand high-road manufacturing jobs in California.
-- END --
https://www.industrialsage.com/power-transformer-lead-times-us-grid-shortage/ ↑
Wood Mackenzie, “Transformer troubles: manufacturing and policy constraints hit US transformer supply” August 13, 2025. https://www.woodmac.com/news/opinion/transformer-troubles-manufacturing-and-policy-constraints-hit-us-transformer-supply/ ↑
US Department of Energy, “Report to Congress on Large Power Transformer Resilience,” July 2024. U.S. Department of Energy Large Power Transformer Resilience Report to Congress, July 2024 ↑
ASSEMBLY THIRD READING
ATR Bill Id:AB 2516
Author:(Petrie-Norris)
As Amended Ver:April 13, 2026
Majority vote
SUMMARY
Creates the California Grid Manufacturing (CGM) Initiative to aggregate demand for and centralize procurement of critical electricity grid components and to provide financial assistance to projects that manufacture such components in California, among other requirements.
Major Provisions
- Defines critical electricity grid components to mean electricity grid components—equipment materials or devices used in the transmission, distribution or storage of electricity for which supply constraints, extended lead times, elevated costs or other limitations to procurement are causing delays to the construction, upgrade or maintenance of transmission and distribution infrastructure.
- Creates the Energy Unit within the Governor's Office of Business and Economic Development (GO-Biz) to establish, in coordination with other energy agencies and what the bill calls "public utilities," which, for purposes of this bill, refers to both investor-owned utilities and municipal utilities, the CGM Initiative to procure critical electricity grid components on behalf of public utilities.
- Authorizes the Energy Unit to provide financial assistance to projects that establish or expand manufacturing capacity in California for electricity grid components and to enter into production joint ventures with private suppliers to provide (a) shared ownership, equity stakes or other legally permissible participation by the state, establishment or expansion of manufacturing facilities within California and lower cost for finished products as compared to prevailing market prices.
- Authorizes the California Infrastructure and Economic Development Bank (IBank) to issue revenue bonds on behalf of the Energy Unit to finance procurement of manufacturing of electricity grid components.
- Provides the California Public Utilities Commission (CPUC) to authorize recovery of CGM Initiative costs, to the extent such costs are just and reasonable.
- Requires the Energy Unit to submit an annual report on the CGI Initiative to the Legislature.
COMMENTS
Grid Buildout and Supply Chain Constraints. California's electric grid is undergoing significant expansion to support the state's clean energy, electrification, reliability goals. This effort requires substantial investment in transmission and distribution infrastructure and a reliable supply of critical grid components such as transformers, conductors, switchgear, and substation equipment. However, supply chain constraints, limited manufacturing capacity, and increasing demand have contributed to extended lead times and significant cost increases for many of these components, delaying grid upgrades, renewable energy interconnections, and new customer connections.
Procurement of grid equipment is currently conducted largely on a utility specific basis, with utilities independently developing forecasts and entering procurement contracts. This decentralized approach may limit opportunities to consolidate purchasing, standardize specifications, and support expanded manufacturing capacity for critical grid equipment.
AB 2516 would create the California Grid Manufacturing (CGM) Initiative within GO-Biz Energy Unit to aggregate demand for and centralize procurement of critical electricity grid components on behalf of investor owned and municipal utilities. The bill would also authorize financial assistance and joint ventures to support manufacturing of grid components in California and authorize the I-Bank to issue revenue bonds related to procurement and manufacturing activities.
According to the Author
According to the author, "California's electricity grid faces a supply chain crisis that is driving up costs for families, delaying critical renewable energy projects, and undermining our climate goals. National and global bottlenecks for essential grid equipment, particularly transformers, have caused lead times to stretch from weeks to years and prices to spike as much as 95 percent. These cost increases are passed directly to ratepayers and will continue to compound for decades. AB 2516 establishes the California Grid Manufacturing Initiative to aggregate statewide demand for grid components, coordinate procurement to achieve economies of scale, and incentivize in-state manufacturing through public-private joint ventures, thereby lowering costs, creating thousands of high-road manufacturing jobs, and positioning California as a national leader in building the grid infrastructure our clean energy future demands."
Arguments in Support
AB 2516 is supported by consumer advocates, clean energy organizations, labor and industry groups, and building decarbonization organizations, among others, which contend that supply chain constraints and rising costs for critical grid equipment are delaying grid upgrades and clean energy deployment. Supporters argue that the bill would help coordinate procurement of critical grid components, support in state manufacturing, improve equipment availability, reduce long term infrastructure costs, and support grid reliability and clean energy deployment.
Arguments in Opposition
This bill is opposed by San Diego Gas & Electric, which argues that requiring a procurement plan for 2028 through 2032 would force the utility to predict project needs and equipment requirements years in advance. SDG&E contends this could create unnecessary complexity and increase the risk that procured equipment may no longer match a project's final needs.
FISCAL COMMENTS
According to the Assembly Committee on Appropriations, this bill would result in significant General Fund costs for both the GO-Biz Energy Unit and the I-Bank. The GO-Biz Energy Unit states that it does not currently have experience administering the type of program created by the bill and estimates one time costs of approximately $2 million for outside consulting services related to grid component needs and market analysis, as well as ongoing annual costs of approximately $960,000 for staffing and outside market advisory support.
The I-Bank estimates annual implementation costs ranging from approximately $1.62 million to $2.88 million for staffing, depending on program demand, as well as approximately $1.5 million in one-time consulting costs related to manufacturing and market analysis. The I-Bank further states that the program may require an initial appropriation of between $500 million and $1 billion from the General Fund or another funding source to support financing activities.
VOTES
ASM UTILITIES AND ENERGY: 15-1-2
YES: Petrie-Norris, Boerner, Calderon, Chen, Mark González, Harabedian, Hart, Irwin, Kalra, Papan, Rogers, Schiavo, Schultz, Wallis, Zbur
NO: Davies
ABS, ABST OR NV: Patterson, Ta
ASM ECONOMIC DEVELOPMENT, GROWTH, AND HOUSEHOLD IMPACT: 7-0-1
YES: Solache, Muratsuchi, Patel, Petrie-Norris, Michelle Rodriguez, Soria, Wallis
ABS, ABST OR NV: Castillo
ASM APPROPRIATIONS: 12-2-1
YES: Wicks, Hoover, Aguiar-Curry, Calderon, Caloza, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache
NO: Dixon, Tangipa
ABS, ABST OR NV: Ta
UPDATED
VERSION: April 13, 2026
CONSULTANT: Lina V. Malova / U. & E. / (916) 319-2083 FN: 0002713
Date of Hearing: May 13, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 2516
Author:(Petrie-Norris) – As Amended Ver:April 13, 2026
Policy Committee: | Utilities and Energy | Vote: | 15 - 1 |
Economic Development, Growth, and Household Impact | 7 - 0 | ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill creates the California Grid Manufacturing (CGM) Initiative to aggregate demand for and centralize procurement of critical electricity grid components and to provide financial assistance to projects that manufacture such components in California.
More specifically, this bill, among other things:
- Defines critical electricity grid components to mean electricity grid components—equipment materials or devices used in the transmission, distribution or storage of electricity for which supply constraints, extended lead times, elevated costs or other limitations to procurement are causing delays to the construction, upgrade or maintenance of transmission and distribution infrastructure.
- Creates the Energy Unit within the Governor’s Office of Business and Economic Development (GO-Biz) to establish, in coordination with other energy agencies and what the bill calls “public utilities,” which, for purposes of this bill, refers to both investor-owned utilities and municipal utilities, the CGM Initiative to procure critical electricity grid components on behalf of public utilities.
- Authorizes the Energy Unit to provide financial assistance to projects that establish or expand manufacturing capacity in California for electricity grid components and to enter into production joint ventures with private suppliers to provide (a) shared ownership, equity stakes or other legally permissible participation by the state, establishment or expansion of manufacturing facilities within California and lower cost for finished products as compared to prevailing market prices.
- Authorizes the California Infrastructure and Economic Development Bank (IBank) to issue revenue bonds on behalf of the Energy Unit to finance procurement of manufacturing of electricity grid components.
- Provides the California Public Utilities Commission (CPUC) to authorize recovery of CGM Initiative costs, to the extent such costs are just and reasonable.
- Requires the Energy Unit to submit an annual report on the CGI Initiative to the Legislature.
FISCAL EFFECT:
- GO-Biz Energy Unit. The Energy Unit notes it has neither experience with nor expertise in the type of program this bill directs it to create. The Energy Unit identifies one-time costs unique to the first year as a $2 million (General Fund (GF)) contract with an outside consultant to assess short-term and long-term needs for critical grid components, develop a study of the industry and market, and make recommendations. In addition, the Energy Unit anticipates costs in that first year and each year thereafter of $960,000 (GF) for seven positions—a manager, five program analysts and an attorney—and a contract with an outside market advisor.
- IBank. The IBank notes it does not know the size of the market for electricity grid components procurement or manufacturing this bill authorizes it to finance. For this reason, IBank provides a low-end estimate of annual implementation costs, $1.62 million (GF) for seven positions, and a high-end estimate of those costs, $2.88 million (GF) for 13 positions.
The IBank concludes it will also incur one-time costs of $1.5 million (GF) for a contract with an outside consultant to study the current California manufacturing base and out-of-state manufacturers that might be establish operations in California in response to the CGM Initiative.
In addition, the IBank concludes it will need to obtain an initial funding appropriation of $500 million to $1 billion (GF or some other source) to be used as leverage to secure outside funding or for direct loans.
COMMENTS:
California has ambitious clean energy goals. Achievement of those goals will take tremendous investment in all aspects of the electrical grid—generation, transmission, distribution and storage. The state has begun this expansion, however, utilities report delays resulting from supply constraints and shortfalls, as well as price increase for critical electricity components.
The rationale behind this bill is that the state can identify collective demand for these components across utilities and industries, aggregate that demand and then coordinate their procurement, which, the author and bill proponents contend, will reduce costs and incentivize in-state production of those components. The logic, as described by the author:
National and global bottlenecks for essential grid equipment, particularly transformers, have caused lead times to stretch from weeks to years and prices to spike as much as 95 percent. These cost increases are passed directly to ratepayers and will continue to compound for decades. AB 2516 establishes the California Grid Manufacturing Initiative to aggregate statewide demand for grid components, coordinate procurement to achieve economies of scale, and incentivize in-state manufacturing through public-private joint ventures, thereby lowering costs, creating thousands of high-road manufacturing jobs, and positioning California as a national leader in building the grid infrastructure our clean energy future demands.
Or, as a coalition consisting mainly of labor groups and environmental advocates puts it:
First, CGMI will conduct a statewide assessment of grid equipment needs and aggregate demand across utilities and agencies in consultation with key energy institutions…Second, the initiative authorizes the state to pursue public–private joint ventures when supply shortages or excessive costs persist… Third, CGMI utilizes a self-sustaining financing model that leverages lower-cost public financing tools while protecting the state’s General Fund. Through structured procurement agreements and preferred supplier arrangements, the initiative can recycle revenues and maintain long-term operational stability.
These descriptions notwithstanding, the IBank asserts it is not clear what will be the source of repayment for the bonds the bill authorizes the IBank to issue. If the bonds are to be repaid by the sale of electricity grid components, then, in IBank’s assessment, the bonds would simply be an aggregation of corporate sales, which, IBank warns, would likely be viewed as speculative. IBank believes, if such is the case, it will be difficult to sell bonds.
In any case, the bill is opposed by the state’s three largest electrical investor-owned utilities. For example, San Diego Gas and Electric objects by writing:
The legislative findings…assert that shortages of transformers and other grid components warrant a shift to statewide centralized procurement. However, it is unclear what evidence supports this conclusion, as a mandatory, state controlled procurement structure has not been demonstrated to be an effective or efficient solution to supply chain constraints.
Similarly, writing jointly, Pacific Gas and Electric and Southern California Edison bluntly assert “Right Problem, Wrong Solution” and elaborate “the bill’s centralized procurement and mandatory offtake requirements would add unnecessary costs and complexity for customers.”
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: April 21, 2026
ASSEMBLY COMMITTEE ON ECONOMIC DEVELOPMENT, GROWTH, AND HOUSEHOLD IMPACT
José Luis Solache, Jr., Chair
ABPCA Bill Id:AB 2516 (
Author:Petrie-Norris) – As Amended Ver:March 24, 2026
SUBJECT: California Grid Manufacturing Initiative
SUMMARY: Establishes the California Grid Manufacturing Initiative, led by the Energy Unit, within the Governor’s Office of Business and Economic Development (Go-Biz) to coordinate statewide demand, procurement, and in-state manufacturing of critical electricity grid components.
Specifically, this bill:
- Requires the Energy Unit, in coordination with the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, the Independent System Operator, and the California Infrastructure and Economic Development Bank (I-Bank), to establish the California Grid Manufacturing Initiative..
- Requires the Energy Unit to serve as the state’s central entity for aggregating demand for critical electricity grid components, to coordinate the procurement of electricity grid components, and to incentivize new or existing in-state manufacturing of electricity grid components.
- Requires the Energy Unit to develop a process for each public utility, on or before January 1, 2028 and regularly thereafter, to submit a projection of its purchasing needs for critical electricity grid components (including type, quantity and delivery timelines) for which the public utility has not entered into a purchase agreement.
- Requires the Energy Unit, based on the projections, to determine the statewide aggregate purchasing needs for critical electricity grid components, which shall serve as the basis for procurement and manufacturing incentives.
- Requires a public utility that purchases electricity grid components identified pursuant to the bill to purchase those components from the initiative, unless the initiative is unable to provide them.
- Permits an electrical corporation, and requires the Public Utilities Commission, to authorize the recovery of costs incurred by the electrical corporation in implementing the above-described requirements, and would authorize a local publicly owned electric utility to recover from its ratepayers the costs incurred from the implementation of the above-described requirements from its ratepayers. By imposing new duties on local publicly owned electric utilities, the bill would impose a state-mandated local program.
- Because a violation of a commission action implementing the bill’s requirement regulating the procurement practices of electrical corporations would be a crime, this bill would impose a state-mandated local program.
- Authorizes the Energy Unit to issue requests for proposals or other competitive solicitations to procure critical electricity grid components, prioritizing proposals that promote in-state manufacturing and high road employment.
- Requires the Energy Unit to identify any critical electricity grid components for which cost, supply constraints, or other limitations inhibit the state’s ability to achieve its energy goals, and authorizes the Energy Unit to provide financial assistance to projects that establish or expand manufacturing capacity in California for those components. The bill also authorizes the Energy Unit to enter into production joint ventures with qualified private suppliers and to provide bond financing and other assistance.
- Creates the California Grid Manufacturing Initiative Revolving Fund in the State Treasury, and the Manufacturing Incentive Account and the Procurement Account within the revolving fund, for the purpose of providing financial assistance pursuant to the initiative. The bill would make the moneys in the revolving fund continuously appropriated for expenditure in accordance with the initiative.
- Authorizes the I-Bank, on behalf of the Energy Unit, to issue taxable or tax-exempt revenue bonds to finance procurement and manufacturing of electricity grid components, and requires the proceeds of the bonds to be deposited into the respective accounts. By establishing a continuously appropriated fund, the bill would make an appropriation.
- Provides that no reimbursement is required by this act because local agencies have the authority to levy service charges, fees, or assessments to pay for the program and because the act creates a new crime under Section 17556 of the Government Code, the state is not required to provide reimbursement.
EXISTING LAW:
- Establishes the Governor’s Office of Business and Economic Development (GO-Biz) within the Governor’s office and requires GO-Biz to serve the Governor as the lead entity for economic strategy and the marketing of California on issues relating to business development, private sector investment, and economic growth.
- Creates within GO-Biz the Energy Unit to accelerate the planning, financing, and execution of critical energy infrastructure projects, as specified.
- A violation of an order, decision, rule, direction, demand, or requirement of the Public Utilities Commission is a crime.
- Existing law, the Bergeson-Peace Infrastructure and Economic Development Bank Act, establishes the California Infrastructure and Economic Development Bank (I-Bank) within GO-Biz and, among other things, authorizes the I-Bank to make loans, issue bonds, and provide financial assistance for various types of projects that qualify as economic development or public development facilities, as provided.
FISCAL EFFECT: Unknown
COMMENTS: This bill creates a clear, criteria-driven process to designate Strategic Clean Energy and Critical Mineral Development Zones and directs state resources to the locations most capable of delivering large-scale energy and supply chain gains. It prioritizes these zones for infrastructure investment, economic development incentives, and streamlined coordination. The bill assigns the Governor’s Office of Business and Economic Development a central role in aligning state efforts and requires coordination with the California Energy Commission, the California Public Utilities Commission, and the California Air Resources Board to integrate permitting, planning, and investment. It advances transmission buildout, site readiness, and industrial clustering, including co-location of energy production and manufacturing, to reduce costs and supply chain risk.
The bill defines designation criteria to target regions with the highest return on public investment. These criteria include the presence of significant clean energy resources such as geothermal, solar, or wind; access to critical mineral deposits including lithium; existing or planned transmission capacity and grid interconnection potential; proximity to industrial infrastructure, workforce, and transportation corridors; readiness of sites for near-term development; and the potential to deliver economic benefits, including job creation and regional development. These factors focus state action on areas where projects can scale quickly and efficiently.
The author seeks to close the gap between California’s climate targets and the infrastructure and industrial capacity required to meet them. Under SB 100, the state must achieve 100 percent zero-carbon electricity by 2045, which will require rapid expansion of generation, storage, and supporting infrastructure. At the same time, reliance on global supply chains for batteries and critical materials exposes the state to price volatility and supply disruptions. California holds major advantages, including lithium resources in the Salton Sea region and the largest geothermal capacity in the nation, but these assets remain underdeveloped due to fragmented planning and insufficient infrastructure.
This bill adopts a place-based industrial strategy that concentrates investment in high-potential regions. This approach reduces development costs, accelerates timelines, and strengthens domestic supply chains while supporting job growth. By prioritizing state investment in foundational infrastructure, the bill reduces uncertainty for private developers and acts as a de-risking mechanism to attract capital.
Author’s Statement: According to the author, “California’s electricity grid faces a supply chain crisis that is driving up costs for families, delaying critical renewable energy projects, and undermining our climate goals. National and global bottlenecks for essential grid equipment, particularly transformers, have caused lead times to stretch from weeks to years and prices to spike as much as 95 percent. AB 2516 establishes the California Grid Manufacturing Initiative to aggregate statewide demand, coordinate procurement, and incentivize in-state manufacturing, thereby lowering costs, creating thousands of high-road jobs, and positioning California as a national leader in building the grid infrastructure our clean energy future demands.”
REGISTERED SUPPORT / OPPOSITION:
Support
Bluegreen Alliance
Building Decarbonization Action Fund
Building Decarbonization Coalition Action Fund
California Environmental Voters (formerly Clcv)
California Federation of Labor Unions
California Forward
California Green New Deal Coalition
California Labor for Climate Jobs
Coalition of California Utility Employees
Communication Workers of America, District 9
IBEW Local 1245
Industrious Labs
International Brotherhood of Electrical Workers, Local 1245
International Union, United Automobile, Aerospace, and Agricultural Implement Workers of America
Jobs to Move America
Los Angeles Alliance for a New Economy (LAANE)
Public Citizen
Rising Sun Center for Opportunity
Sierra Club California
Sylvatex, INC.
The Environmental Protection Information Center (EPIC)
The Utility Reform Network (TURN)
United Steelworkers District 12
Opposition
San Diego Gas and Electric Company
Oppose Unless Amended
Pacific Gas and Electric Company and its Affiliated Entities |
Southern California Edison |
Analysis Prepared by: Carla Castilla/ E.D., G., & H.I. / (916) 319-2090
Date of Hearing: April 8, 2026
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
ABPCA Bill Id:AB 2516 (
Author:Petrie-Norris) – As Amended Ver:March 24, 2026
SUBJECT: California Grid Manufacturing Initiative
SUMMARY: Establishes the California Grid Manufacturing Initiative within the GO-Biz, Energy Unit, in coordination with specified state entities, to aggregate demand, coordinate procurement, and incentivize in-state manufacturing of critical electricity grid components.
Specifically, this bill:
- Defines:
- Critical electricity grid components to mean any electricity grid components identified pursuant to subdivision (a) of Section 12100.83, which may include, but are not limited to, transformers, cables, wires, circuit breakers, reconductors, and switchgears.
- High road employment” means employment that is consistent with the job quality standards and employment practices set forth in subdivision (s) of Section 14005 of the Unemployment Insurance Code.
- Energy Unit as the Energy Unit created within the GO-Biz.
- Requires the Energy Unit, in coordination with the California Public Utilities Commission (CPUC), California Energy Commission (CEC), California Independent System Operator (CAISO), and California Infrastructure and Economic Development Bank (I-Bank), to establish the California Grid Manufacturing Initiative.
- Requires the Energy Unit to serve as the state’s central entity for aggregating demand, coordinating procurement of electricity grid components, and incentivizing new or existing in-state manufacturing of electricity grid components.
- Requires the Energy Unit to identify electricity grid components
- Requires the Energy Unit to develop a process for each public utility, on or before January 1, 2028 and regularly thereafter, to submit a projection of its purchasing needs for critical electricity grid components for which the public utility has not entered into a purchase agreement.
- Requires the Energy Unit, based on the projections, to determine the statewide aggregate purchasing needs for critical electricity grid components, which shall serve as the basis for procurement and manufacturing incentives.
- Requires a public utility that purchases electricity grid components identified by the initiative to purchase those components through the initiative, unless the initiative is unable to provide them.
- Authorizes an electrical corporation, and requires the CPUC, to approve recovery of costs incurred pursuant to this article.
- Authorizes a local publicly owned electric utility to recover its costs from ratepayers.
- Requires the associated offtake obligation to apply regardless of whether the equipment is utilized.
- Prohibits a public utility from using alternative procurement mechanisms in place of participation in the initiative if doing so would undermine the demand signal to manufacturers.
- Authorizes the Energy Unit to issue requests for proposals or other competitive solicitations to procure critical electricity grid components based on the state’s aggregate purchasing needs for critical electricity needs.
- Requires the Energy Unit, in evaluating proposals, to prioritize those that promote in-state manufacturing and high road employment.
- Requires the Energy Unit to evaluate whether the market can meet demand in a timely and cost-effective manner without intervention.
- Requires the Energy Unit to identify any critical electricity grid components for which cost, supply constraints, or other limitations inhibit the state’s ability to achieve its energy goals.
- Authorizes the I-Bank, on behalf of the Energy Unit, to issue revenue bonds to finance the procurement and manufacturing of electricity grid components.
- Requires the Energy Unit to work with suppliers to identify barriers to production that can be addressed through regulatory assistance, incentives available through existing programs, or any other forms of assistance.
- Requires the Energy Unit, in providing financial assistance to evaluate projects based on specified criteria, including
- The extent to which the project will further the state’s energy goals, including by reducing delays and costs.
- The extent to which the project will create long-term high road employment in California.
- Requires financial incentives to be conditioned on measurable public benefits, including high-road job creation, community benefits, workforce development, affordability, and capacity expansion.
- Requires the Energy Unit to issue one or more requests for qualifications to identify entities that are qualified and willing to enter into production joint ventures with the state to manufacture critical electricity grid components in California.
- Requires the Energy Unit to issue a request for qualifications that solicits information that includes the following:
- Evidence of the experience, competency, capability, and capacity to complete and operate manufacturing projects of similar size, scope, or complexity, including financial condition, relevant technical expertise, and demonstrated management competency.
- High road employment commitments, history of compliance with workplace laws and regulations, and safety record.
- Authorizes the Energy Unit, after evaluating responses to a request for qualifications, to:
- select one or more qualified suppliers to enter negotiations for production joint ventures;
- Invite selected respondents to submit proposals or bids; or
- Decline to proceed if market conditions improve.
- Provides that the Energy Unit is not obliged to enter into a joint venture or provide incentives to an entity that responds to a request for qualifications.
- Authorizes the Energy Unit to enter into production joint ventures with qualified private suppliers selected through the request for qualifications process, and provide assistance through:
- bond financing through the California Infrastructure and Economic Development Bank;
- low-cost loans or loan guarantees;
- advance purchase commitments or mandatory offtake agreements; and
- site access, leasing of public land, or permitting assistance.
- Provides that bond proceeds may be used to fund necessary reserves, capitalized interest, and costs of issuance.
- Provides that bonds issued do not constitute a debt or liability of the state or any political subdivision and are payable solely from the revolving fund and its assets.
- Requires private suppliers or joint ventures to submit operating plans demonstrating how they will meet the Energy Unit’s cost recovery and procurement goals.
- Requires the Energy Unit to ensure that production joint ventures are awarded through a transparent, competitive, and merit-based process and are structured to protect public funds, support high-road jobs, and deliver community benefits.
- Requires the CPUC, upon application by the Energy Unit, to approve recovery of costs incurred from electric ratepayers.
- Provides that recoverable costs may include procurement payments, bond repayment obligations, storage costs, and administrative expenses, net of any offsetting revenues.
- Requires cost recovery to be subject to commission review for reasonableness, cost-effectiveness, and alignment with state energy policy.
- Requires the Energy Unit to submit an annual report to the Legislature detailing purchasing needs, procurements, added manufacturing capacity, ratepayer costs and savings, job impacts, and fiscal impacts associated with implementation of this article.
- Provides that if any provision of this article or its application is held invalid, that invalidity does not affect other provisions or applications that can be given effect.
- Creates the California Grid Manufacturing Initiative Revolving Fund in the State Treasury, and the Manufacturing Incentive Account and the Procurement Account within the revolving fund, for the purpose of providing financial assistance pursuant to the initiative.
- Continuously appropriates moneys in the revolving fund for purposes of the initiative.
- Requires moneys generated for purposes of the article, including proceeds from the sale of bonds to support manufacturing of electricity grid components, to be deposited into the Manufacturing Incentive Account.
- Requires moneys generated for purposes of the article, including proceeds from the sale of bonds supporting procurement of electricity grid components and revenues from sales of those components to public utilities, to be deposited into the Procurement Account
EXISTING LAW:
- Establishes GO-Biz within the Governor's Office and requires it to serve as the lead state entity for economic strategy, business development, private sector investment, and economic growth. (Government Code § 12100.50 et seq.)
- Creates within GO-Biz the Energy Unit to accelerate the planning, financing, and execution of critical energy infrastructure projects, including facilitating permitting and coordinating state investment in clean energy. (Government Code § 12100.110)
- Establishes the California Infrastructure and Economic Development Bank (I-Bank) within GO-Biz and authorizes the I-Bank to make loans, issue bonds, and provide financial assistance for projects qualifying as economic development or public development facilities. The I-Bank's Climate Catalyst Revolving Loan Fund includes a separate Clean Energy Transmission Financing Account with specific legal authority to finance transmission under specified conditions. (Government Code § 63000 et seq.)
- Establishes the policy that all of the state's retail electricity be supplied with a mix of RPS-eligible and zero-carbon resources by December 31, 2045, for a total of 100% clean energy. (Public Utilities Code § 454.53)
FISCAL EFFECT: Unknown. This bill is keyed fiscal and will be referred to the Committee on Appropriations for its review
BACKGROUND:
Grid Infrastructure Buildout – California’s electric grid is expanding to meet the state’s clean energy and electrification goals, replace aging infrastructure, and support reliability and wildfire resilience.[1] This effort requires significant investment in both transmission and distribution systems, along with a steady supply of critical electricity grid components such as transformers, conductors, switchgear, and other transmission and distribution equipment, including substation components. These components are essential to bringing new generation online, upgrading existing infrastructure, and ensuring the grid operates safely and reliably. For example, large power transformers are used to move electricity over long distances, while distribution transformers deliver power to homes and businesses. Conductors and transmission lines must also be upgraded or reconductored to carry increasing loads. In addition, substation equipment and switchgear are necessary to manage and control the flow of electricity across the system. Given the scale of planned upgrades, maintaining a consistent and reliable supply of these components will be critical to keeping projects on track.
Supply Chain Constraints – The supply of critical electricity grid components remains constrained due to global supply chain disruptions, limited manufacturing capacity, and growing demand from electrification and new generation development. Demand for transformers in the United States has increased significantly in recent years, while domestic production capacity has not kept pace, contributing to extended lead times that can reach two to four years for certain large power transformers. Utilities have reported delays in obtaining large power transformers needed for transmission projects, as well as distribution transformers required for system upgrades and new customer connections. At the same time, prices for this equipment have risen substantially, with industry data showing increases of roughly 45 to 95 percent since 2019.[2] These conditions can delay transmission upgrades and, in turn, delay the interconnection of renewable energy and storage projects. As a result, limited availability of critical grid components continues to affect both the timing and cost of grid development which ultimately affect ratepayers.
Fragmented Procurement – Procurement of critical grid components in California is primarily undertaken on a utility-specific basis, with each utility independently developing load forecasts, issuing solicitations, and executing contracts. This decentralized approach results in fragmented and often intermittent demand, which can limit opportunities to consolidate purchasing, standardize specifications, and provide the long-term certainty needed to support domestic manufacturing. This can have implications for market outcomes. Smaller, less predictable procurement volumes may weaken utilities’ negotiating position with suppliers, particularly for capital-intensive, long-lead-time equipment such as large power transformers, circuit breakers, and high-voltage cables. Variability in utility specifications may also necessitate customized production runs, increasing per-unit costs and reducing the efficiencies associated with standardized manufacturing. Additionally, the absence of coordinated, forward-looking procurement commitments at a statewide level may constrain manufacturers’ willingness to invest in expanded production capacity or new facilities, given the significant capital investment required for grid equipment manufacturing.
GO-Biz/Energy Unit – The California Governor’s Office of Business and Economic Development (GO-Biz) serves as the state’s lead entity for economic development and supports businesses and project developers in navigating state requirements, particularly for projects involving multiple agencies or jurisdictions. Within GO-Biz, the Energy Unit focuses on energy and infrastructure projects, including renewable generation, energy storage, and transmission. The unit coordinates with the CPUC, CEC, and CAISO, as well as local governments and utilities, with a focus on permitting and project timelines. The Energy Unit has supported implementation of the state’s Clean Energy Permitting Playbook, which outlines actions to improve interagency coordination and streamline permitting for clean energy and transmission projects. It has also been involved in efforts related to the Transmission Accelerator, which is intended to facilitate financing and cost recovery for priority transmission projects, helping address financing and cost recovery challenges associated with large, capital-intensive infrastructure. Together, these efforts are intended to help reduce delays in bringing grid infrastructure online, including projects dependent on long-lead equipment such as transformers.
COMMENTS:
- Author’s Statement. According to the author, “California’s electricity grid faces a supply chain crisis that is driving up costs for families, delaying critical renewable energy projects, and undermining our climate goals. National and global bottlenecks for essential grid equipment, particularly transformers, have caused lead times to stretch from weeks to years and prices to spike as much as 95 percent. These cost increases are passed directly to ratepayers and will continue to compound for decades. AB 2516 establishes the California Grid Manufacturing Initiative to aggregate statewide demand for grid components, coordinate procurement to achieve economies of scale, and incentivize in-state manufacturing through public-private joint ventures, thereby lowering costs, creating thousands of high-road manufacturing jobs, and positioning California as a national leader in building the grid infrastructure our clean energy future demands.”
- This Bill. AB 2516 establishes the California Grid Manufacturing Initiative (CGMI) within GO-Biz to address both demand- and supply-side constraints in grid component markets:
- Demand-side: The Energy Unit identifies critical grid components and establishes a process requiring utilities, including IOUs, POUs, and other transmission owners, to submit projected procurement needs by January 1, 2028, and on an ongoing basis. Projections include component type, quantity, specifications, and delivery timelines. Based on aggregated statewide demand, the Energy Unit conducts centralized procurement through competitive solicitations, prioritizing in-state manufacturing and high-road employment. Utilities must procure through the initiative unless unavailable.
- Supply-side: The Energy Unit identifies components subject to cost or supply constraints and may provide financial assistance to support in-state manufacturing, including I-Bank bond financing, loans or loan guarantees, advance purchase commitments or offtake agreements, site access, and permitting support. It may also enter into joint ventures with private suppliers to expand in-state production, reduce costs, and share equity. Incentives are conditioned on public benefits, including job creation, workforce development, affordability, and capacity expansion.
- Financing: Establishes the CGMI Revolving Fund, including Manufacturing Incentive and Procurement Accounts. I-Bank may issue revenue bonds, payable solely from the fund. The CPUC must approve cost recovery, subject to reasonableness and cost-effectiveness review.
- Reporting: Requires annual reporting to the Legislature on procurement, manufacturing capacity, ratepayer impacts, job benefits, and fiscal outcomes.
- Clarifying Roles. As already stated, AB 2516 would require the Energy Unit to serve as the state’s central entity for aggregating demand for critical electricity grid components, coordinating procurement, and incentivizing new or expanded in state manufacturing. In doing so, the bill establishes a state directed procurement structure under which the Energy Unit would play a central role in determining procurement needs and overseeing procurement. While intended to coordinate procurement, and address supply constraints, this approach could add some operational complexity to utility planning and procurement, as it transfers procurement responsibilities from utilities, who currently carry out these functions through existing planning processes and subject to CPUC or local oversight, to a centralized state entity. As such, the committee recommends revising these provisions to clarify that the Energy Unit shall identify critical electricity grid components in coordination with public utilities and determine appropriate forms of state assistance to address delays, including centralized procurement only where warranted and limited to participating public utilities.
- Procurement Upon Utility Request. This bill authorizes the Energy Unit to issue requests for proposals or other competitive solicitations to procure critical electricity grid components based on the state’s aggregate purchasing needs. While intended to support coordinated procurement, this provision does not explicitly specify that procurement through the Energy Unit occurs only at the request of participating public utilities. As such, the committee recommends clarifying that procurement under this section is limited to the needs and conditions submitted by participating public utilities, and that any resulting commitment to purchase remains binding where those conditions are satisfied, regardless of whether the equipment is ultimately utilized.
- Notification. This measure authorizes the Energy Unit to issue requests for proposals or other competitive solicitations to procure critical electricity grid components based on the state’s aggregate purchasing needs. This provision does not specify the actions to be taken where the Energy Unit determines that the market cannot meet demand in a timely and cost-effective manner without intervention. As such, the committee recommends that, where the Energy Unit determines, in coordination with the CEC, the CAISO, and the I-Bank, that the market cannot meet demand for a critical electricity grid component in a timely and cost-effective manner without intervention, the Energy Unit shall notify public utilities as soon as practicable.
- Conflict of Interest Safeguards. AB 2516 authorizes the Energy Unit to carry out procurement activities and engage in joint venture negotiations related to critical electricity grid components. These activities involve financial decisions that warrant safeguards to ensure transparency and accountability. As such, the committee the Energy Unit to adopt conflict of interest policies governing employees and contractors involved in procurement decisions and joint venture negotiations and consistent with the Political Reform Act.
- Cost Recovery Standards. This legislation provides that, upon application by the Energy Unit for cost recovery, the CPUC shall approve recovery of costs incurred by the Energy Unit. This requirement effectively guarantees cost recovery for a state agency to receive ratepayer dollars outside an appropriation of the Legislature, and without requiring the CPUC to evaluate whether those costs are just and reasonable. As such, the committee recommends striking the requirement that the Energy Unit apply to the CPUC for any cost recovery, clarifying that the CPUC may authorize recovery of costs incurred under this chapter only to the extent it determines those costs are just and reasonable, consistent with Section 451 of the Public Utilities Code, and aligned with state energy policy.
- Restricting Cost Recovery. AB 2516 specifies that recoverable costs may include procurement payments, bond repayment obligations, storage costs, and administrative expenses, net of any offsetting revenues, and further provides that cost recovery shall be subject to CPUC review for reasonableness, cost-effectiveness, and alignment with energy policy. Specifying categories of recoverable costs may limit CPUC’s discretion in determining which costs are appropriate for recovery. As such, the committee recommends deleting these provisions to maintain the commission’s discretion in evaluating cost recovery to the extent those costs are just and reasonable.
- Electricity rates in California are among the highest in the nation. Any cost savings should be reflected in customer bills. As such, the committee recommends specifying that, to the extent procurement through the initiative results in costs below prevailing market prices for grid components, the Public Utilities Commission shall ensure that those savings are credited to ratepayers in a manner consistent with Section 451 of the Public Utilities Code.
- Prior Legislation.
SB 787 (McNerney, 2025) establishes a formal interagency MOU framework and a Senior Counselor on Industrial Policy and Clean Energy Development at the CEC to coordinate California's clean energy supply chain development efforts across batteries, offshore wind, and building decarbonization sectors. Status: Vetoed By the Governor
Assembly Bill 1373 (2023) authorized California to use the Department of Water Resources (DWR) to centrally procure long lead-time (LLT) clean energy resources, such as offshore wind and geothermal energy, to meet 2045 climate goals and ensure grid reliability. Status: Chapter 367, Statutes of 2023
- Double Referral. This bill is double referred. Upon passage in this committee, it will be referred to the Assembly Committee on Economic Development, Growth, and Household Impact for its review.
REGISTERED SUPPORT / OPPOSITION:
Support
Bluegreen Alliance
Building Decarbonization Action Fund
California Forward
California Labor for Climate Jobs
Coalition of California Utility Employees
Communication Workers of America, District 9
Industrious Labs
International Brotherhood of Electrical Workers, Local 1245
International Union, United Automobile, Aerospace, and Agricultural Implement Workers of America
Los Angeles Alliance for a New Economy (LAANE)
Omex Industries LLC
Public Citizen
Rising Sun Center for Opportunity
Sierra Club California
The Utility Reform Network (TURN)
United Steelworkers District 12
Oppose
San Diego Gas and Electric Company
Opposition Unless Amended
Pacific Gas and Electric Company and its Affiliated Entities
Southern California Edison
Analysis Prepared by: Lina V. Malova / U. & E. / (916) 319-2083
California Independent System Operator, 20-Year Transmission Outlook (Folsom, CA: California Independent System Operator, 2024), https://www.caiso.com/documents/20-year-transmission-outlook.pdf ↑
Wood Mackenzie, “Transformer troubles: manufacturing and policy constraints hit US transformer supply” https://www.woodmac.com/news/opinion/transformer-troubles-manufacturing-and-policy-constraints-hit-us-transformer-supply/#:~:text=Since%202019%2C%20unit%20costs%20have,the%20evolving%20US%20policy%20landscape. ↑
Discussed in Hearing
Senate Standing Committee on Business, Professions and Economic Development
Senate Standing Committee on Energy, Utilities and Communications
Assembly Floor
Assembly Standing Committee on Economic Development, Growth, and Household Impact
Assembly Standing Committee on Utilities and Energy
Bill Author
Bill Co-Author(s):