Existing law vests the Public Utilities Commission with regulatory authority over public utilities. Existing law prohibits public utilities, other than certain common carriers, from selling, leasing, assigning, mortgaging, or otherwise disposing of, or encumbering, its assets that are necessary or useful in the performance of its duties to the public, unless the public utility has secured an order from the commission to do so for a qualified transaction above $5,000,000 or an approval from the commission through the filing of an advice letter for a qualified transaction at or below $5,000,000.
This bill would exempt from that prohibition easements, or changes to easements, that have a ratepayer financial impact valued at $100,000 or less if a public utility that is a party to the qualified transaction has gross annual California revenues of $500,000,000 or more. The bill would require, beginning January 1, 2030, and every 5 years thereafter, those threshold values to increase to reflect any increase in inflation, as specified. The bill would require each public utility to annually file a Tier 1 advice letter with a report of all transactions performed pursuant to this exemption, enumerated by date, value, location, and party.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act, and a violation of a commission action implementing the above-described provisions would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities. Existing law prohibits public utilities, other than certain common carriers, from selling, leasing, assigning, mortgaging, or otherwise disposing of, or encumbering, its assets that are necessary or useful in the performance of its duties to the public, unless the public utility has secured an order from the commission to do so for a qualified transaction above $5,000,000 or an approval from the commission through the filing of an advice letter for a qualified transaction at or below $5,000,000.
This bill would exempt from that prohibition easements, or changes to easements, that have a ratepayer financial impact valued at $100,000 or less if a public utility that is a party to the qualified transaction has gross annual California revenues of $500,000,000 or more. The bill would require, beginning January 1, 2030, and every 5 years thereafter, those threshold values to increase to reflect any increase in inflation, as specified. The bill would require each public utility to annually file a Tier 1 advice letter with a report of all transactions performed pursuant to this exemption, enumerated by date, value, location, and party.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act, and a violation of a commission action implementing the above-described provisions would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities. Existing law prohibits public utilities, other than certain common carriers, from selling, leasing, assigning, mortgaging, or otherwise disposing of, or encumbering, its assets that are necessary or useful in the performance of its duties to the public, unless the public utility has secured an order from the commission to do so for a qualified transaction above $5,000,000 or an approval from the commission through the filing of an advice letter for a qualified transaction at or below $5,000,000.
This bill would exempt from that prohibition a qualified conveyance of an easement or the execution of a relocation agreement that has easements, or changes to easements, that have a ratepayer financial impact valued at $100,000 or less if a public utility that is a party to the qualified transaction has gross annual California revenues of $500,000,000 or more. The bill would require, beginning January 1, 2030, and every 5 years thereafter, those threshold values to increase to reflect any increase in inflation, as specified. The bill would require each public utility, as a part of its general rate case, to utility to annually file a Tier 1 advice letter with a report of all transactions performed pursuant to this exemption, enumerated by date, value, location, and party.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act, and a violation of a commission action implementing the above-described provisions would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities. Existing law prohibits public utilities, other than certain common carriers, from selling, leasing, assigning, mortgaging, or otherwise disposing of, or encumbering, its assets that are necessary or useful in the performance of its duties to the public, unless the public utility has secured an order from the commission to do so for a qualified transaction above $5,000,000 or an approval from the commission through the filing of an advice letter for a qualified transaction at or below $5,000,000.
This bill would exempt from that prohibition a qualified conveyance of an easement or the execution of a relocation agreement that has a ratepayer financial impact valued at $100,000 or less if a public utility that is a party to the qualified transaction has gross annual California revenues of $500,000,000 or more. The bill would require, beginning January 1, 2030, and every 5 years thereafter, those threshold values to increase to reflect any increase in inflation, as specified. The bill would require each public utility, as a part of its general rate case, to report all transactions performed pursuant to this exemption, enumerated by date, value, location, and party.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act, and a violation of a commission action implementing the above-described provisions would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities. Existing law prohibits public utilities, other than certain common carriers, from selling, leasing, assigning, mortgaging, or otherwise disposing of, or encumbering, its assets that are necessary or useful in the performance of its duties to the public, unless the public utility has secured an order from the commission to do so for a qualified transaction above $5,000,000 or an approval from the commission through the filing of an advice letter for a qualified transaction at or below $5,000,000.
This bill would exempt from that prohibition a qualified conveyance of an easement or the execution of a relocation agreement that has a ratepayer financial impact valued at $100,000 or less if a public utility that is a party to the qualified transaction has gross annual California revenues of $500,000,000 or more. The bill would require, beginning January 1, 2030, and every 5 years thereafter, those threshold values to increase to reflect any increase in inflation, as specified.
Existing law authorizes the Public Utilities Commission to meet in closed session to deliberate on a proposed decision, order, or resolution after providing 3-day advance notice to the public, except as specified. Existing law requires the commission to establish a quiet period during the 3 business days before the commissions scheduled vote on a decision, during which oral and written ex parte communications are prohibited. Existing law authorizes an interested person, if the commission materially modifies a proposed decision during the quiet period, to submit a written ex parte communication if certain conditions are met, as specified.This bill would authorize an interested person to submit a written ex parte communication during a quiet period if the commission modifies, rather than materially modifies, a proposed decision.Existing law authorizes the Public Utilities Commission to meet in closed session to deliberate on a proposed decision, order, or resolution after providing 3-day advance notice to the public, except as specified. Existing law requires the commission to establish a quiet period during the 3 business days before the commissions scheduled vote on a decision, during which oral and written ex parte communications are prohibited. Existing law authorizes an interested person, if the commission materially modifies a proposed decision during the quiet period, to submit a written ex parte communication if certain conditions are met, as specified.
This bill would authorize an interested person to submit a written ex parte communication during a quiet period if the commission modifies, rather than materially modifies, a proposed decision.
(a)Except as provided in subdivision (c), a public utility, other than a common carrier by railroad subject to Part A of the Interstate Commerce Act (49 U.S.C. Sec. 10101 et seq.), shall not sell, lease, assign, mortgage, or otherwise dispose of, or encumber the whole or any part of, its railroad, street railroad, line, plant, system, or other property necessary or useful in the performance of its duties to the public, or any franchise or permit or any right thereunder, or by any means whatsoever, directly or indirectly, merge or consolidate its railroad, street railroad, line, plant, system, or other property, or franchises or permits or any part thereof, without first having either secured an order from the commission authorizing it to do so for qualified transactions valued above five million dollars ($5,000,000), or for qualified transactions valued at five million dollars ($5,000,000) or less, filed an advice letter and obtained approval from the commission authorizing it to do so. If the advice letter is uncontested, approval may be given by the executive director or the director of the division of the commission having regulatory jurisdiction over the utility. The commission shall determine the types of transactions valued at five million dollars ($5,000,000) or less, that qualify for advice letter handling. For a qualified transaction valued at five million dollars ($5,000,000) or less, the commission may designate a procedure different than the advice letter procedure if it determines that the transaction warrants a more comprehensive review. Absent protest or incomplete documentation, the commission shall approve or deny the advice letter within 120 days of its filing by the applicant public utility. The commission shall reject any advice letter that seeks to circumvent the five-million-dollar ($5,000,000) threshold by dividing a single asset with a value of more than five million dollars ($5,000,000) into component parts, each valued at less than five million dollars ($5,000,000). Every sale, lease, assignment, mortgage, disposition, encumbrance, merger, or consolidation made other than in accordance with the advice letter and approval from the commission authorizing it is void. The permission and approval of the commission to the exercise of a franchise or permit under Article 1 (commencing with Section 1001) of Chapter 5, or the sale, lease, assignment, mortgage, or other disposition or encumbrance of a franchise or permit under this article, shall not revive or validate any lapsed or invalid franchise or permit, or enlarge or add to the powers or privileges contained in the grant of any franchise or permit, or waive any forfeiture.
(b)(1)Subdivision (a) shall apply to any transaction described in subparagraph (F) of paragraph (1) of subdivision (b) of Section 854.2.
(2)For any transaction described in subparagraph (F) of paragraph (1) of subdivision (b) of Section 854.2, as part of its review under subdivision (a), the commission shall determine whether the transaction is fair and reasonable to affected public utility employees, including both union and nonunion employees.
(c)(1)Subdivision (a) shall not apply to an easement, or a change to an easement, that has a ratepayer financial impact valued at one hundred thousand dollars ($100,000) or less if a public utility that is a party to the qualified transaction has gross annual California revenues of five hundred million dollars ($500,000,000) or more.
(2)On January 1, 2030, and every five years thereafter, the threshold values specified in paragraph (1) shall be adjusted to reflect any increase in inflation as measured by the Consumer Price Index for All Urban Consumers (CPI-U) published by the United States Bureau of Labor Statistics.
(3)Each public utility shall annually file a Tier 1 advice letter with the commission by April 1, with a report of all transactions performed pursuant to paragraph (1), enumerated by date, value, location, and party.(d)This section does not prevent the sale, lease, encumbrance, or other disposition by any public utility of property that is not necessary or useful in the performance of its duties to the public, and any disposition of property by a public utility shall be conclusively presumed to be of property that is not useful or necessary in the performance of its duties to the public, as to any purchaser, lessee, or encumbrancer dealing with that property in good faith for value, provided that this section does not apply to the interchange of equipment in the regular course of transportation between connecting common carriers.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)Except as provided in subdivision (c), a public utility, other than a common carrier by railroad subject to Part A of the Interstate Commerce Act (49 U.S.C. Sec. 10101 et seq.), shall not sell, lease, assign, mortgage, or otherwise dispose of, or encumber the whole or any part of, its railroad, street railroad, line, plant, system, or other property necessary or useful in the performance of its duties to the public, or any franchise or permit or any right thereunder, or by any means whatsoever, directly or indirectly, merge or consolidate its railroad, street railroad, line, plant, system, or other property, or franchises or permits or any part thereof, without first having either secured an order from the commission authorizing it to do so for qualified transactions valued above five million dollars ($5,000,000), or for qualified transactions valued at five million dollars ($5,000,000) or less, filed an advice letter and obtained approval from the commission authorizing it to do so. If the advice letter is uncontested, approval may be given by the executive director or the director of the division of the commission having regulatory jurisdiction over the utility. The commission shall determine the types of transactions valued at five million dollars ($5,000,000) or less, that qualify for advice letter handling. For a qualified transaction valued at five million dollars ($5,000,000) or less, the commission may designate a procedure different than the advice letter procedure if it determines that the transaction warrants a more comprehensive review. Absent protest or incomplete documentation, the commission shall approve or deny the advice letter within 120 days of its filing by the applicant public utility. The commission shall reject any advice letter that seeks to circumvent the five-million-dollar ($5,000,000) threshold by dividing a single asset with a value of more than five million dollars ($5,000,000) into component parts, each valued at less than five million dollars ($5,000,000). Every sale, lease, assignment, mortgage, disposition, encumbrance, merger, or consolidation made other than in accordance with the advice letter and approval from the commission authorizing it is void. The permission and approval of the commission to the exercise of a franchise or permit under Article 1 (commencing with Section 1001) of Chapter 5, or the sale, lease, assignment, mortgage, or other disposition or encumbrance of a franchise or permit under this article, shall not revive or validate any lapsed or invalid franchise or permit, or enlarge or add to the powers or privileges contained in the grant of any franchise or permit, or waive any forfeiture.
(b)(1)Subdivision (a) shall apply to any transaction described in subparagraph (F) of paragraph (1) of subdivision (b) of Section 854.2.
(2)For any transaction described in subparagraph (F) of paragraph (1) of subdivision (b) of Section 854.2, as part of its review under subdivision (a), the commission shall determine whether the transaction is fair and reasonable to affected public utility employees, including both union and nonunion employees.
(c)(1)Subdivision (a) shall not apply to an easement, or a change to an easement, that has a ratepayer financial impact valued at one hundred thousand dollars ($100,000) or less if a public utility that is a party to the qualified transaction has gross annual California revenues of five hundred million dollars ($500,000,000) or more.
(2)On January 1, 2030, and every five years thereafter, the threshold values specified in paragraph (1) shall be adjusted to reflect any increase in inflation as measured by the Consumer Price Index for All Urban Consumers (CPI-U) published by the United States Bureau of Labor Statistics.
(3)Each public utility shall annually file a Tier 1 advice letter with the commission by April 1, with a report of all transactions performed pursuant to paragraph (1), enumerated by date, value, location, and party.(d)This section does not prevent the sale, lease, encumbrance, or other disposition by any public utility of property that is not necessary or useful in the performance of its duties to the public, and any disposition of property by a public utility shall be conclusively presumed to be of property that is not useful or necessary in the performance of its duties to the public, as to any purchaser, lessee, or encumbrancer dealing with that property in good faith for value, provided that this section does not apply to the interchange of equipment in the regular course of transportation between connecting common carriers.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)Except as provided in subdivision (c), a public utility, other than a common carrier by railroad subject to Part A of the Interstate Commerce Act (49 U.S.C. Sec. 10101 et seq.), shall not sell, lease, assign, mortgage, or otherwise dispose of, or encumber the whole or any part of, its railroad, street railroad, line, plant, system, or other property necessary or useful in the performance of its duties to the public, or any franchise or permit or any right thereunder, or by any means whatsoever, directly or indirectly, merge or consolidate its railroad, street railroad, line, plant, system, or other property, or franchises or permits or any part thereof, without first having either secured an order from the commission authorizing it to do so for qualified transactions valued above five million dollars ($5,000,000), or for qualified transactions valued at five million dollars ($5,000,000) or less, filed an advice letter and obtained approval from the commission authorizing it to do so. If the advice letter is uncontested, approval may be given by the executive director or the director of the division of the commission having regulatory jurisdiction over the utility. The commission shall determine the types of transactions valued at five million dollars ($5,000,000) or less, that qualify for advice letter handling. For a qualified transaction valued at five million dollars ($5,000,000) or less, the commission may designate a procedure different than the advice letter procedure if it determines that the transaction warrants a more comprehensive review. Absent protest or incomplete documentation, the commission shall approve or deny the advice letter within 120 days of its filing by the applicant public utility. The commission shall reject any advice letter that seeks to circumvent the five-million-dollar ($5,000,000) threshold by dividing a single asset with a value of more than five million dollars ($5,000,000) into component parts, each valued at less than five million dollars ($5,000,000). Every sale, lease, assignment, mortgage, disposition, encumbrance, merger, or consolidation made other than in accordance with the advice letter and approval from the commission authorizing it is void. The permission and approval of the commission to the exercise of a franchise or permit under Article 1 (commencing with Section 1001) of Chapter 5, or the sale, lease, assignment, mortgage, or other disposition or encumbrance of a franchise or permit under this article, shall not revive or validate any lapsed or invalid franchise or permit, or enlarge or add to the powers or privileges contained in the grant of any franchise or permit, or waive any forfeiture.
(b)(1)Subdivision (a) shall apply to any transaction described in subparagraph (F) of paragraph (1) of subdivision (b) of Section 854.2.
(2)For any transaction described in subparagraph (F) of paragraph (1) of subdivision (b) of Section 854.2, as part of its review under subdivision (a), the commission shall determine whether the transaction is fair and reasonable to affected public utility employees, including both union and nonunion employees.
(c)(1)Subdivision (a) shall not apply to a qualified conveyance of an easement or the execution of a relocation agreement an easement, or a change to an easement, that has a ratepayer financial impact valued at one hundred thousand dollars ($100,000) or less if a public utility that is a party to the qualified transaction has gross annual California revenues of five hundred million dollars ($500,000,000) or more.
(2)On January 1, 2030, and every five years thereafter, the threshold values specified in paragraph (1) shall be adjusted to reflect any increase in inflation as measured by the Consumer Price Index for All Urban Consumers (CPI-U) published by the United States Bureau of Labor Statistics.
(3)As a part of its general rate case, each public utility shall Each public utility shall annually file a Tier 1 advice letter with the commission by April 1, with a report of all transactions performed pursuant to paragraph (1), enumerated by date, value, location, and party.(d)This section does not prevent the sale, lease, encumbrance, or other disposition by any public utility of property that is not necessary or useful in the performance of its duties to the public, and any disposition of property by a public utility shall be conclusively presumed to be of property that is not useful or necessary in the performance of its duties to the public, as to any purchaser, lessee, or encumbrancer dealing with that property in good faith for value, provided that this section does not apply to the interchange of equipment in the regular course of transportation between connecting common carriers.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)Except as provided in subdivision (c), a public utility, other than a common carrier by railroad subject to Part A of the Interstate Commerce Act (49 U.S.C. Sec. 10101 et seq.), shall not sell, lease, assign, mortgage, or otherwise dispose of, or encumber the whole or any part of, its railroad, street railroad, line, plant, system, or other property necessary or useful in the performance of its duties to the public, or any franchise or permit or any right thereunder, or by any means whatsoever, directly or indirectly, merge or consolidate its railroad, street railroad, line, plant, system, or other property, or franchises or permits or any part thereof, without first having either secured an order from the commission authorizing it to do so for qualified transactions valued above five million dollars ($5,000,000), or for qualified transactions valued at five million dollars ($5,000,000) or less, filed an advice letter and obtained approval from the commission authorizing it to do so. If the advice letter is uncontested, approval may be given by the executive director or the director of the division of the commission having regulatory jurisdiction over the utility. The commission shall determine the types of transactions valued at five million dollars ($5,000,000) or less, that qualify for advice letter handling. For a qualified transaction valued at five million dollars ($5,000,000) or less, the commission may designate a procedure different than the advice letter procedure if it determines that the transaction warrants a more comprehensive review. Absent protest or incomplete documentation, the commission shall approve or deny the advice letter within 120 days of its filing by the applicant public utility. The commission shall reject any advice letter that seeks to circumvent the five million dollar five-million-dollar ($5,000,000) threshold by dividing a single asset with a value of more than five million dollars ($5,000,000), ($5,000,000) into component parts, each valued at less than five million dollars ($5,000,000). Every sale, lease, assignment, mortgage, disposition, encumbrance, merger, or consolidation made other than in accordance with the advice letter and approval from the commission authorizing it is void. The permission and approval of the commission to the exercise of a franchise or permit under Article 1 (commencing with Section 1001) of Chapter 5, or the sale, lease, assignment, mortgage, or other disposition or encumbrance of a franchise or permit under this article, shall not revive or validate any lapsed or invalid franchise or permit, or enlarge or add to the powers or privileges contained in the grant of any franchise or permit, or waive any forfeiture.
(b)(1)Subdivision (a) shall apply to any transaction described in subparagraph (F) of paragraph (1) of subdivision (b) of Section 854.2.
(2)For any transaction described in subparagraph (F) of paragraph (1) of subdivision (b) of Section 854.2, as part of its review under subdivision (a), the commission shall determine whether the transaction is fair and reasonable to affected public utility employees, including both union and nonunion employees.
(c)(1)Subdivision (a) shall not apply to a qualified conveyance of an easement or the execution of a relocation agreement that has a ratepayer financial impact valued at one hundred thousand dollars ($100,000) or less if a public utility that is a party to the qualified transaction has gross annual California revenues of five hundred million dollars ($500,000,000) or more.
(2)On January 1, 2030, and every five years thereafter, the threshold values specified in paragraph (1) shall be adjusted to reflect any increase in inflation as measured by the Consumer Price Index for All Urban Consumers (CPI-U) published by the United States Bureau of Labor Statistics.
(3)As a part of its general rate case, each public utility shall report all transactions performed pursuant to paragraph (1), enumerated by date, value, location, and party.
(d)This section does not prevent the sale, lease, encumbrance, or other disposition by any public utility of property that is not necessary or useful in the performance of its duties to the public, and any disposition of property by a public utility shall be conclusively presumed to be of property that is not useful or necessary in the performance of its duties to the public, as to any purchaser, lessee, or encumbrancer dealing with that property in good faith for value, provided that this section does not apply to the interchange of equipment in the regular course of transportation between connecting common carriers.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)A Except as provided in subdivision (c), a public utility, other than a common carrier by railroad subject to Part A of the Interstate Commerce Act (49 U.S.C. Sec. 10101 et seq.), shall not sell, lease, assign, mortgage, or otherwise dispose of, or encumber the whole or any part of of, its railroad, street railroad, line, plant, system, or other property necessary or useful in the performance of its duties to the public, or any franchise or permit or any right thereunder, or by any means whatsoever, directly or indirectly, merge or consolidate its railroad, street railroad, line, plant, system, or other property, or franchises or permits or any part thereof, without first having either secured an order from the commission authorizing it to do so for qualified transactions valued above five million dollars ($5,000,000), or for qualified transactions valued at five million dollars ($5,000,000) or less, filed an advice letter and obtained approval from the commission authorizing it to do so. If the advice letter is uncontested, approval may be given by the executive director or the director of the division of the commission having regulatory jurisdiction over the utility. The commission shall determine the types of transactions valued at five million dollars ($5,000,000) or less, that qualify for advice letter handling. For a qualified transaction valued at five million dollars ($5,000,000) or less, the commission may designate a procedure different than the advice letter procedure if it determines that the transaction warrants a more comprehensive review. Absent protest or incomplete documentation, the commission shall approve or deny the advice letter within 120 days of its filing by the applicant public utility. The commission shall reject any advice letter that seeks to circumvent the five million dollar ($5,000,000) threshold by dividing a single asset with a value of more than five million dollars ($5,000,000), into component parts, each valued at less than five million dollars ($5,000,000). Every sale, lease, assignment, mortgage, disposition, encumbrance, merger, or consolidation made other than in accordance with the advice letter and approval from the commission authorizing it is void. The permission and approval of the commission to the exercise of a franchise or permit under Article 1 (commencing with Section 1001) of Chapter 5, or the sale, lease, assignment, mortgage, or other disposition or encumbrance of a franchise or permit under this article article, shall not revive or validate any lapsed or invalid franchise or permit, or enlarge or add to the powers or privileges contained in the grant of any franchise or permit, or waive any forfeiture.
(b)(1)Subdivision (a) shall apply to any transaction described in subparagraph (F) of paragraph (1) of subdivision (b) of Section 854.2.
(2)For any transaction described in subparagraph (F) of paragraph (1) of subdivision (b) of Section 854.2, as part of its review under subdivision (a), the commission shall determine whether the transaction is fair and reasonable to affected public utility employees, including both union and nonunion employees.
(c)(1)Subdivision (a) shall not apply to a qualified conveyance of an easement or the execution of a relocation agreement that has a ratepayer financial impact valued at one hundred thousand dollars ($100,000) or less if a public utility that is a party to the qualified transaction has gross annual California revenues of five hundred million dollars ($500,000,000) or more.
(2)On January 1, 2030, and every five years thereafter, the threshold values specified in paragraph (1) shall be adjusted to reflect any increase in inflation as measured by the Consumer Price Index for All Urban Consumers (CPI-U) published by the United States Bureau of Labor Statistics.
(c)(d)This section does not prevent the sale, lease, encumbrance, or other disposition by any public utility of property that is not necessary or useful in the performance of its duties to the public, and any disposition of property by a public utility shall be conclusively presumed to be of property that is not useful or necessary in the performance of its duties to the public, as to any purchaser, lessee, or encumbrancer dealing with that property in good faith for value, provided that this section does not apply to the interchange of equipment in the regular course of transportation between connecting common carriers.
SECTION 1.Section 1701.9 of the Public Utilities Code is amended to read:1701.9.The following provisions apply during the pendency of a commission proceeding, except these provisions do not apply during an adjudicatory or quasi-legislative proceeding:(a)The commission may meet in closed session to deliberate on a proposed decision, order, or resolution after providing three-day advance notice to the public.(b)The commission shall establish a quiet period during the three business days before the commissions scheduled vote on a decision, during which oral ex parte communications shall not be permitted.(c)The requirement specified in subparagraph (F) of paragraph (1) of subdivision (b) of Section 11123 of the Government Code shall not apply to a meeting of the commission during a quiet period that is held by teleconference.(d)(1)If the commission modifies a proposed decision during the first two business days of the three-day quiet period before the commissions scheduled vote on the proposed decision, an interested person may submit a written ex parte communication during those two business days if copies of the written ex parte communication are concurrently transmitted to all parties at the same time as the written ex parte communication is submitted to the commission and the scope of the written ex parte communication is limited to the portion of the proposed decision that was modified.(2)If the commission modifies a proposed decision during the last business day of the three-day quiet period before the commissions scheduled vote on the proposed decision, an interested person may submit a written ex parte communication on that day if copies of the written ex parte communication are concurrently transmitted to all parties at the same time as the written ex parte communication is submitted to the commission and the scope of the written ex parte communication is limited to the portion of the proposed decision that was modified.The following provisions apply during the pendency of a commission proceeding, except these provisions do not apply during an adjudicatory or quasi-legislative proceeding:
(a)The commission may meet in closed session to deliberate on a proposed decision, order, or resolution after providing three-day advance notice to the public.
(b)The commission shall establish a quiet period during the three business days before the commissions scheduled vote on a decision, during which oral ex parte communications shall not be permitted.
(c)The requirement specified in subparagraph (F) of paragraph (1) of subdivision (b) of Section 11123 of the Government Code shall not apply to a meeting of the commission during a quiet period that is held by teleconference.
(d)(1)If the commission materially modifies a proposed decision during the first two business days of the three-day quiet period before the commissions scheduled vote on the proposed decision, an interested person may submit a written ex parte communication during those two business days if copies of the written ex parte communication are concurrently transmitted to all parties at the same time as the written ex parte communication is submitted to the commission and the scope of the written ex parte communication is limited to the portion of the proposed decision that was materially modified.
(2)If the commission materially modifies a proposed decision during the last business day of the three-day quiet period before the commissions scheduled vote on the proposed decision, an interested person may submit a written ex parte communication on that day if copies of the written ex parte communication are concurrently transmitted to all parties at the same time as the written ex parte communication is submitted to the commission and the scope of the written ex parte communication is limited to the portion of the proposed decision that was materially modified.
|
Date
|
Status
|
|---|---|
| Oct 1, 2025 | Chaptered by Secretary of State - Chapter 150, Statutes of 2025. |
| Oct 1, 2025 | Approved by the Governor. |
| Sep 9, 2025 | Enrolled and presented to the Governor at 3 p.m. |
| Sep 3, 2025 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 79. Noes 0. Page 2854.). |
| Aug 26, 2025 | In Assembly. Concurrence in Senate amendments pending. |
| Aug 25, 2025 | Read third time. Passed. Ordered to the Assembly. (Ayes 37. Noes 0. Page 2250.). |
| Aug 20, 2025 | Read second time. Ordered to Consent Calendar. |
| Aug 19, 2025 | From committee: Be ordered to second reading file pursuant to Senate Rule 28.8 and ordered to Consent Calendar. |
| Jul 17, 2025 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 17, 2025 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 16. Noes 0.) (July 15). |
| Jun 26, 2025 | In committee: Hearing postponed by committee. |
| Jun 4, 2025 | Referred to Com. on E., U & C. |
| May 23, 2025 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 23, 2025 | Read third time. Passed. Ordered to the Senate. (Ayes 71. Noes 0. Page 1661.) |
| May 15, 2025 | Read second time. Ordered to Consent Calendar. |
| May 14, 2025 | From committee: Do pass. To Consent Calendar. (Ayes 15. Noes 0.) (May 14). |
| Apr 29, 2025 | Re-referred to Com. on APPR. |
| Apr 28, 2025 | Read second time and amended. |
| Apr 24, 2025 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 18. Noes 0.) (April 23). |
| Apr 10, 2025 | Re-referred to Com. on U. & E. |
| Apr 9, 2025 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Feb 18, 2025 | Referred to Com. on U. & E. |
| Feb 6, 2025 | From printer. May be heard in committee March 8. |
| Feb 5, 2025 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 3, 2025 | The committee on HSG recommend that the measure be PASSED, UNAMENDED | Assembly Floor |
Passed |
|
| Aug 25, 2025 | Consent Calendar 2nd AB420 Petrie-Norris | Senate Floor |
Passed |
|
| Jul 15, 2025 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] with the recommendation: To Consent Calendar | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
|
| May 23, 2025 | AB 420 Petrie-Norris Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| May 14, 2025 | Do pass. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 23, 2025 | Do pass as amended, and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar | Assembly Standing Committee on Utilities and Energy |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Association of California Cities - Orange County | ** Support | |
| California Building Industry Association | ** Support | |
| City of Vista | ** Support | |
| San Diego Gas and Electric Company | ** Support |
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 420
Author:(Petrie-Norris)
As Amended Ver:July 17, 2025
Majority vote
SUMMARY
Exempts certain sales of large investor-owned utilities (IOU) property valued at $100,000 or less from review by the California Public Utilities Commission (CPUC). Authorizes the value threshold to increase with the cost of inflation.
Senate Amendments
- Clarifies the exemption applies only to an easement or a change to an easement, and
- Specifies IOUs must file via a Tier 1 advice letter all transactions subject to the exemption by April 1 of each year. The Assembly version of this measure required this filing as part of the IOU general rate case.
COMMENTS
State law prevents an IOU from broadly disposing of or encumbering its assets over $5 million that are necessary or useful in the performance of its duties to the public, unless the IOU has secured an order from the CPUC. For a qualified transaction at or below $5 million, approval from the CPUC can be obtained through an advice letter. Generally, the process of filing an advice letter with the CPUC is much less onerous than the process of securing an order from the CPUC.
Despite the availability of the advice letter process, the author believes an even more-streamlined process is needed to allow IOUs to complete very small transactions. This bill provides such a streamlined process by exempting outright certain property transactions from CPUC review, with an annual report to the CPUC of all transactions that qualified for the exemption.
According to the Author
According to the author, "California has some of the most robust utility customer protections in the nation. Unfortunately, some of the processes within the CPUC have become overly time consuming, and seem to favor process over outcomes. AB 420 identifies and streamlines a subset of minor land transactions that are delaying projects like new housing and interconnections to renewables. These delays can add 6-12 months to projects for transactions that are rarely questioned or controversial."
Arguments in Support
Writing in support of the bill, the California Building Industry Association, referencing housing projects specifically, argues the CPUC advice letter process "can often stall or prolong the building process while easements within a development are moved or transferred." They note the exemption provided in this bill "will streamline the review of the necessary movement or transfer of easements to ensure development projects do not experience unnecessary delay."
Arguments in Opposition
None on file.
FISCAL COMMENTS
According to the Assembly Committee on Appropriations, any costs to the CPUC for this measure should be minor and absorbable. The Senate Committee on Appropriations passed this measure out pursuant to Senate Rule 28.8 finding that any state costs of the measure are not significant.
VOTES:
ASM UTILITIES AND ENERGY: 18-0-0
YES: Petrie-Norris, Patterson, Boerner, Calderon, Chen, Davies, Mark González, Harabedian, Hart, Irwin, Kalra, Papan, Rogers, Schiavo, Schultz, Ta, Wallis, Zbur
ASM APPROPRIATIONS: 15-0-0
YES: Wicks, Sanchez, Arambula, Calderon, Caloza, Dixon, Elhawary, Fong, Mark González, Hart, Pacheco, Pellerin, Solache, Ta, Tangipa
ASSEMBLY FLOOR: 71-0-8
YES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Calderon, Caloza, Carrillo, Castillo, Connolly, Davies, DeMaio, Dixon, Elhawary, Flora, Fong, Gabriel, Gallagher, Garcia, Gipson, Jeff Gonzalez, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Muratsuchi, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Solache, Soria, Stefani, Ta, Tangipa, Valencia, Wallis, Ward, Wilson, Zbur, Rivas
ABS, ABST OR NV: Bryan, Chen, Ellis, Nguyen, Sanchez, Schultz, Sharp-Collins, Wicks
SENATE FLOOR: 37-0-3
YES: Allen, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Reyes, Richardson, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
ABS, ABST OR NV: Alvarado-Gil, Hurtado, Rubio
UPDATED
VERSION: July 17, 2025
CONSULTANT: Laura Shybut / U. & E. / (916) 319-2083 FN: 0001254
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 420 |
CONSENT
Bill No: AB 420
Author: Petrie-Norris (D)
Amended: 7/17/25 in Senate
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 16-0, 7/15/25
AYES: Becker, Ochoa Bogh, Allen, Archuleta, Arreguín, Caballero, Dahle, Gonzalez, Grove, Hurtado, Limón, McNerney, Rubio, Stern, Strickland, Wahab
NO VOTE RECORDED: Ashby
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 71-0, 5/23/25 (Consent) - See last page for vote
SUBJECT: Public utilities: property, franchises, and permits: exemption
SOURCE: California Building Industry Association
DIGEST:
This bill exempts certain sales of public utility property valued at $100,000 or less for the large electric investor-owned utilities (IOU) from review by the California Public Utilities Commission (CPUC).
ANALYSIS:
Existing law:
- Establishes and vests the CPUC with regulatory authority over public utilities. (Article XII of the California Constitution)
- Prohibits a public utility from changing any rate or rule as to result in any new rate, except upon a showing before the CPUC and a finding by the CPUC that the new rate is justified. Provides that the procedures for advice letters may include provision for notice to customers or subscribers on a case-by-case basis, as determined by the CPUC. Provides that the CPUC may adopt rules it considers reasonable and proper for each class of public utility providing for the nature of the showing required to be made in support of proposed rate changes. (Public Utilities Code §454)
- Prohibits a public utility (except for certain railroads) from selling, leasing, assigning, mortgaging, or otherwise disposing of, or encumbering the whole or any part of its plant, system, or other property necessary or useful in the performance of its duties to the public, or any franchise or permit or any right thereunder, or by any means whatsoever, directly or indirectly, merge or consolidate its plant, system, or other property, or franchises or permits or any part thereof, with any other public utility, without first having either secured an order from the CPUC authorizing it to do so for qualified transactions valued above $5 million, or for qualified transactions valued at $5 million or less, filed an advice letter and obtained approval from the CPUC authorizing it to do so. Requires any sale that does not adhere to the above requirements is void. (Public Utilities Code §851(a)(b))
- Authorizes the sale, lease, encumbrance, or other disposition by any public utility of property that is not necessary or useful in the performance of its duties to the public. (Public Utilities Code §851(c))
- Prohibits a person or corporation from merging, acquiring, or controlling either directly or indirectly any public utility organized and doing business in this state without first securing authorization to do so from the CPUC. Requires that any merger, acquisition, or control without that prior authorization is void and of no effect. (Public Utilities Code §854(a))
This bill:
- Exempts from the prohibition of sale of property by public utilities easements or changes to easements that have a ratepayer financial impact valued at $100,000 or less if a public utility that is a party to the qualified transaction has gross annual California revenues of $500 million or more.
- Requires, beginning January 1, 2030, and every five years thereafter, those threshold values to increase to reflect any increase in inflation, as specified.
- Requires each public utility to annually file a Tier 1 advice letter by April 1 with a report of all transactions performed pursuant to this exemption, enumerated by date, value, location, and party.
Background
Public utilities sale of property. As required by Public Utilities Code §851, the CPUC must review and exam any sale of property by a CPUC-regulated utility. The CPUC’s review of a sale of utility property generally takes a few months to over a year, depending on the property involved. In the case of property necessary or useful in the performance of a utility’s duties to the public, the CPUC conducts an examination of the following issues:
- Whether the sale price is reflective of the fair market value for the property in question;
- Determination that the transaction will not have an adverse effect on the public interest or on the ability of the utility to provide safe and reliable service to customers at reasonable rates (impacts on rate base, utility expenses; taxes, and rates);
- If the transaction is a transfer or change in ownership of facilities currently used in regulated utility operations, the transaction will not result in a significant physical or operational change in the facility;
- Ensure that the rights retained by the utility in any proposed easements are sufficient for present and future public utility needs;
- Determine whether the proposed sale is a project for purposes of California Environmental Quality Act; and
- Determine how any loss- or gain-on-sale from the property is to be allocated between ratepayers and utility shareholders.
Advice letters. An advice letter is a document prepared by a utility to request action by the CPUC, including: approval, authorization, or other relief. Most commonly, advice letters are requests for a tariff change, such as an informal request for approval to furnish service under rates, charges, terms or conditions other than those contained in the utility's approved rates and terms and conditions. Statute has largely deferred to the CPUC to adopt rules and procedures for addressing advice letters. Advice letters are procedurally less formal than other proceedings at the CPUC that require more judicial-type elements of an evidentiary hearing. Advice letters are classified into three tiers, ranging from Tier 1 to Tier 3. Tier 1 advice letters generally become effective upon filing of the advice letter. However, Tier 3 advice letters require commissioners to hear the item and take a vote at a publicly noticed meeting.
CPUC Rules. Advice letter filings are governed largely under CPUC General Order 96-B. The rules include provisions related to classification of the advice letters, public notice requirements, and specified requirements by industry (such as water, energy, or telecommunications). Additionally, General Order 173 provides additional rules associated with the filing and disposition of advice letters related to certain transactions transferring interests in utility property valued at $5 million or less, pursuant to Public Utilities Code §851.
Comments
Need for this bill. The supporters of this bill contend this bill would help streamline and expedite otherwise bureaucratic lag at the CPUC associated with the transfer of public utility property. Specifically, they note the requirements to obtain prior CPUC authorization for any sale, lease, encumbrance, or disposal of utility property, regardless of value, pursuant to Public Utilities Code §851 can result in delayed actions for otherwise simple non-contested requests. The California Building Industry Association specifically cites the CPUC review as an administrative burden contributing to prolonging the building of housing developments, often by half a year.
Exempting certain utility property sales from CPUC approval. This bill would exempt certain easement property sales, specifically those that fall below $100,000 in value, by the large IOUs, those with gross revenues of $500 million or more, from first seeking approval from the CPUC for these sales. The supporters of this bill state that over 200 advice letter filings since 2019 with three-quarters of which were for property valued at less than $100,000. They contend that the final approval of these transactions can take six months or more because of the requirement to obtain a vote at a CPUC Business Meeting. This is despite the fact that most of these transactions are low-value, are typically routine, such as easements or service equipment disposal, and do not impact utility service or ratepayers.
Impacts to ratepayers. CPUC review and approval of utility property sales and transfers can help ensure utility ratepayers are compensated appropriately for the sale of the utility property. Exempting certain property sales could result in reduced compensation to utility ratepayers for the property. The supporters of this bill contend that the majority of these transactions are for smaller easement properties that are not generally high value. In a cursory review of the three largest electric utilities, it seems San Diego Gas & Electric had the most advice letters filed for transactions of these kinds within the past year (whereas the other three large electrical corporations seems to have very few or none). Although not taking a formal position, the CPUC does seem to agree with the desire to streamline the review of these transactions, including by exempting them from the more cumbersome CPUC approval. This bill does contain a requirement on IOUs (as it also impact natural gas and very large water corporations) to report these transactions with an annual Tier 1 advice letter filing.
Related/Prior Legislation
SB 550 (Hill, Chapter 409, Statutes of 2019) required the CPUC to review specified safety elements for any proposed merger, acquisition or change in control of an electrical or gas IOU. It conditions approval of the transaction on whether it is in the public interest.
AB 1054 (Holden, Chapter 79, Statutes of 2019) among its many provisions, expanded the definition of change of control to include the voluntary or involuntary transfer of an IOU’s assets to a public entity and made changes to the definition for change of control that included specified criteria and thresholds related to the treatment of the workforce.
SB 492 (Beall, Chapter 359, Statutes of 2017) authorized the San Jose Water Company to sell lands in the Upper Guadalupe watershed to the Midpeninsula Regional Open Space District, until January 1, 2023, without CPUC review and approval of the sale.
AB 698 (Skinner, Chapter 370, Statutes of 2009) relaxed the requirements by allowing the CPUC staff to approve the transfer without a vote of the CPUC commissioners if the proposal is valued at less than $5 million and is uncontested.
AB 735 (Horton, Chapter 370, Statutes of 2005) modified the CPUC’s approval process for the sale or transfer of public utility assets by allowing public utilities to sell, or otherwise transfer property valued at less than $5 million if the transfer is approved by CPUC through a 120-day advice letter process rather than through a formal proceeding.
SB 52 (Rosenthal, Chapter 484, Statutes of 1989) established criteria that the CPUC must consider in reviewing a merger, acquisition, or change of control related to an IOU.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 8/18/25)
California Building Industry Association (Source)
Association of California Cities - Orange County
City of Vista
San Diego Gas and Electric Company
OPPOSITION: (Verified 8/18/25)
None received
ARGUMENTS IN SUPPORT: According to the California Building Industry Association:
The exemption will streamline the review of the necessary movement or transfer of easements to ensure development projects do not experience unnecessary delay. Section 851 of the PUC prohibits a utility from selling, leasing, assigning or otherwise disposing of any of its property without first obtaining authorization from the California Public Utilities Commission (CPUC). For routine business transactions, specifically, the movement or transfer of an easement, often imposes significant administrative costs that often outweigh the value of the property in question. Specifically for the building of Housing Developments, this process can often stall or prolong the building process while easements within a development are moved or transferred. …The exemption under the bill will allow for the expedited movement or transfer of easements, resulting in streamlined work between the CPUC, public utilities and developers so that development timelines are not further delayed. …AB 420 will help remove barriers that delay vital housing production projects by implementing an effective solution that will increase housing availability and affordability.
ASSEMBLY FLOOR: 71-0, 5/23/25
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Calderon, Caloza, Carrillo, Castillo, Connolly, Davies, DeMaio, Dixon, Elhawary, Flora, Fong, Gabriel, Gallagher, Garcia, Gipson, Jeff Gonzalez, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Muratsuchi, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Solache, Soria, Stefani, Ta, Tangipa, Valencia, Wallis, Ward, Wilson, Zbur, Rivas
NO VOTE RECORDED: Bryan, Chen, Ellis, Nguyen, Sanchez, Schultz, Sharp-Collins, Wicks
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
8/21/25 16:45:23
**** END ****
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Josh Becker, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 7/15/2025
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill exempts certain sales of public utility property valued at $100,000 or less for certain public utilities from review by the California Public Utilities Commission (CPUC).
ANALYSIS:
Existing law:
- Establishes and vests the CPUC with regulatory authority over public utilities. (Article XII of the California Constitution)
- Prohibits a public utility from changing any rate or rule as to result in any new rate, except upon a showing before the CPUC and a finding by the CPUC that the new rate is justified. Provides that the procedures for advice letters may include provision for notice to customers or subscribers on a case-by-case basis, as determined by the CPUC. Provides that the CPUC may adopt rules it considers reasonable and proper for each class of public utility providing for the nature of the showing required to be made in support of proposed rate changes. (Public Utilities Code §454)
- Prohibits a public utility (except for certain railroads) from selling, leasing, assigning, mortgaging, or otherwise disposing of, or encumbering the whole or any part of its plant, system, or other property necessary or useful in the performance of its duties to the public, or any franchise or permit or any right thereunder, or by any means whatsoever, directly or indirectly, merge or consolidate its plant, system, or other property, or franchises or permits or any part thereof, with any other public utility, without first having either secured an order from the CPUC authorizing it to do so for qualified transactions valued above $5 million, or for qualified transactions valued at $5 million or less, filed an advice letter and obtained approval from the CPUC authorizing it to do so. Requires any sale that does not adhere to the above requirements is void. (Public Utilities Code §851(a)(b))
- Authorizes the sale, lease, encumbrance, or other disposition by any public utility of property that is not necessary or useful in the performance of its duties to the public. (Public Utilities Code §851(c))
- Prohibits a person or corporation from merging, acquiring, or controlling either directly or indirectly any public utility organized and doing business in this state without first securing authorization to do so from the CPUC. Requires that any merger, acquisition, or control without that prior authorization is void and of no effect. (Public Utilities Code §854(a))
This bill:
- Exempts from the prohibition of sale of property by public utilities a qualified conveyance of an easement or the execution of a relocation agreement that has a ratepayer financial impact valued at $100,000 or less if a public utility that is a party to the qualified transaction has gross annual California revenues of $500 million or more.
- Requires, beginning January 1, 2030, and every five years thereafter, those threshold values to increase to reflect any increase in inflation, as specified.
- Requires each public utility, as a part of its general rate case (GRC), to report all transactions performed pursuant to this exemption, enumerated by date, value, location, and party.
Background
Public utilities sale of property. As required by Public Utilities Code §851, the CPUC must review and exam any sale of property by a CPUC-regulated utility. The CPUC’s review of a sale of utility property generally takes a few months to over a year, depending on the property involved. In the case of property necessary or useful in the performance of a utility’s duties to the public, the CPUC conducts an examination of the following issues:
- Whether the sale price is reflective of the fair market value for the property in question;
- Determination that the transaction will not have an adverse effect on the public interest or on the ability of the utility to provide safe and reliable service to customers at reasonable rates (impacts on rate base, utility expenses; taxes, and rates);
- If the transaction is a transfer or change in ownership of facilities currently used in regulated utility operations, the transaction will not result in a significant physical or operational change in the facility;
- Ensure that the rights retained by the utility in any proposed easements are sufficient for present and future public utility needs;
- Determine whether the proposed sale is a project for purposes of California Environmental Quality Act; and
- Determine how any loss- or gain-on-sale from the property is to be allocated between ratepayers and utility shareholders.
Advice letters. An advice letter is a document prepared by a utility to request action by the CPUC, including: approval, authorization, or other relief. Most commonly, advice letters are requests for a tariff change, such as an informal request for approval to furnish service under rates, charges, terms or conditions other than those contained in the utility's approved rates and terms and conditions. Statute has largely deferred to the CPUC to adopt rules and procedures for addressing advice letters. Advice letters are procedurally less formal than other proceedings at the CPUC that require more judicial-type elements of an evidentiary hearing. Advice letters are classified into three tiers, ranging from Tier 1 to Tier 3. Tier 1 advice letters generally become effective upon filing of the advice letter. However, Tier 3 advice letters require commissioners to hear the item and take a vote at a publicly noticed meeting.
CPUC Rules. Advice letter filings are governed largely under CPUC General Order 96-B. The rules include provisions related to classification of the advice letters, public notice requirements, and specified requirements by industry (such as water, energy, or telecommunications). Additionally, General Order 173 provides additional rules associated with the filing and disposition of advice letters related to certain transactions transferring interests in utility property valued at $5 million or less, pursuant to Public Utilities Code §851.
Comments
Need for this bill. The supporters of this bill contend this bill would help streamline and expedite otherwise bureaucratic lag at the CPUC associated with the transfer of public utility property. Specifically, they note the requirements to obtain prior CPUC authorization for any sale, lease, encumbrance, or disposal of utility property, regardless of value, pursuant to Public Utilities Code §851 can result in delayed actions for otherwise simple non-contested requests. The California Building Industry Association specifically cites the CPUC review as an administrative burden contributing to prolonging the building of housing developments, often by half a year.
Exempting certain utility property sales from CPUC approval. This bill would exempt certain easement property sales, specifically those that fall below $100,000 in value, by the large investor-owned utilities (IOUs), those with gross revenues of $500 million or more, from first seeking approval from the CPUC for these sales. The supporters state that over 200 advice letter filings since 2019 with three-quarters of which were for property valued at less than $100,000. They contend that the final approval of these transactions can take six months or more because of the requirement to obtain a vote at a CPUC Business Meeting. This is despite the fact that most of these transactions are low-value, are typically routine, such as easements or service equipment disposal, and do not impact utility service or ratepayers.
Impacts to ratepayers. CPUC review and approval of utility property sales and transfers can help ensure utility ratepayers are compensated appropriately for the sale of the utility property. Exempting certain property sales could result in reduced compensation to utility ratepayers for the property. The supporters of this bill contend that the majority of these transactions are for smaller easement properties that are not generally high value. In a cursory review of the three largest electric utilities, it seems San Diego Gas & Electric had the most advice letters filed for transactions of these kinds within the past year (whereas the other three large electrical corporations seems to have very few or none). Although not taking a formal position, the CPUC does seem to agree with the desire to streamline the review of these transactions, including by exempting them from the more cumbersome CPUC approval. This bill does contain a requirement on IOUs (as it also impact natural gas and very large water corporations) to report these transactions within their GRC.
Amendments. Among the sponsors and supporters of this bill, there disagreement about the terms used in this bill in naming the utility easements that would otherwise be eligible for the exemption afforded by this bill. Additionally, the supporters have raised concerns about reporting these transactions as part of the general rate case. Instead, the author and committee may wish to amend this bill to delete some of the specific terms in relation to defining the eligible properties and instead reference these as easements, which are generally more broadly understood. Additionally, the author and committee may wish to amend this bill to replace the required reporting to an annually filed advice letter instead of within the general rate case of the utility.
Prior/Related Legislation
SB 550 (Hill, Chapter 409, Statutes of 2019) required the CPUC to review specified safety elements for any proposed merger, acquisition or change in control of an electrical or gas IOU. It conditions approval of the transaction on whether it is in the public interest.
AB 1054 (Holden, Chapter 79, Statutes of 2019) among its many provisions, expanded the definition of change of control to include the voluntary or involuntary transfer of an IOU’s assets to a public entity and made changes to the definition for change of control that included specified criteria and thresholds related to the treatment of the workforce.
SB 492 (Beall, Chapter 359, Statutes of 2017) authorized the San Jose Water Company to sell lands in the Upper Guadalupe watershed to the Midpeninsula Regional Open Space District, until January 1, 2023, without CPUC review and approval of the sale.
AB 698 (Skinner, Chapter 370, Statutes of 2009) relaxed the requirements by allowing the CPUC staff to approve the transfer without a vote of the CPUC commissioners if the proposal is valued at less than $5 million and is uncontested.
AB 735 (Horton, Chapter 370, Statutes of 2005) modified the CPUC’s approval process for the sale or transfer of public utility assets by allowing public utilities to sell, or otherwise transfer property valued at less than $5 million if the transfer is approved by CPUC through a 120-day advice letter process rather than through a formal proceeding.
SB 52 (Rosenthal, Chapter 484, Statutes of 1989) established criteria that the CPUC must consider in reviewing a merger, acquisition, or change of control related to an IOU.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
California Building Industry Association (Sponsor)
Association of California Cities - Orange County
City of Vista
San Diego Gas and Electric Company, if amended
OPPOSITION:
None received
ARGUMENTS IN SUPPORT: According to the California Building Industry Association:
The exemption will streamline the review of the necessary movement or transfer of easements to ensure development projects do not experience unnecessary delay. Section 851 of the PUC prohibits a utility from selling, leasing, assigning or otherwise disposing of any of its property without first obtaining authorization from the California Public Utilities Commission (CPUC). For routine business transactions, specifically, the movement or transfer of an easement, often imposes significant administrative costs that often outweigh the value of the property in question. Specifically for the building of Housing Developments, this process can often stall or prolong the building process while easements within a development are moved or transferred. …The exemption under the bill will allow for the expedited movement or transfer of easements, resulting in streamlined work between the CPUC, public utilities and developers so that development timelines are not further delayed. …AB 420 will help remove barriers that delay vital housing production projects by implementing an effective solution that will increase housing availability and affordability.
-- END --
Date of Hearing: May 14, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 420
Author:(Petrie-Norris) – As Amended Ver:April 28, 2025
Policy Committee: | Utilities and Energy | Vote: | 18 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill exempts from the need for prior approval from the California Public Utilities Commission (CPUC) certain low-dollar-value real estate transactions that convey the property of a large investor-owned utility (IOU).
Specifically, this bill provides an exception to the general requirement in existing law that an IOU receive CPUC approval before selling, leasing, assigning, mortgaging or otherwise disposing of, or encumbering the whole or any part of its property necessary or useful in the performance of its duties to the public without first having either secured an order from the CPUC authorizing it to do so or having filed an advice letter with the CPUC. The bill’s exception applies to a transaction that has a ratepayer financial impact valued at $100,000 or less if an IOU that is a party to the transaction has gross annual California revenues of $500 million or more.
The bill adjust the $100,000 threshold for inflation every five years, beginning January 1, 2030.
Finally, the bill requires each IOU, as part of its general rate case, report all transactions performed pursuant to the authority provided in this bill, enumerated by date, value, location and party.
FISCAL EFFECT:
Any costs to the CPUC should be minor and absorbable.
COMMENTS:
State law prevent an IOU from selling, leasing, assigning, mortgaging or otherwise disposing of, or encumbering its assets over $5 million that are necessary or useful in the performance of its duties to the public, unless the IOU has secured an order from the CPUC. For a qualified transaction at or below $5 million, approval from the CPUC can be obtained through an advice letter. Generally, the process of filing an advice letter with the CPUC is much less onerous than is the process of securing an order from the CPUC.
Despite the availability of the advice letter process, the author believes an even more-streamlined process is needed to allow IOUs to complete very small transactions. According to the author;
California has some of the most robust utility customer protections in the nation. Unfortunately, some of the processes within the CPUC have become overly time consuming, and seem to favor process over outcomes. AB 420 identifies and streamlines a subset of minor land transactions that are delaying projects like new housing and interconnections to renewables. These delays can add 6-12 months to projects for transactions that are rarely questioned or controversial.
Writing in support of the bill, the California Building Industry Association, referencing housing projects specifically, argues the CPUC advice letter process “can often stall or prolong the building process while easements within a development are moved or transferred.”
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: April 23, 2025
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
ABPCA Bill Id:AB 420 (
Author:Petrie-Norris) – As Amended Ver:April 9, 2025
SUBJECT: Public utilities: property, franchises, and permits: exemption
SUMMARY: Allows certain real estate transactions, as specified, undertaken by investor owned utilities (IOUs) that have a value of $100,000 or less to bypass California Public Utilities Commission (CPUC) review and approval. Authorizes the value threshold to increase with the cost of inflation.
EXISTING LAW:
- Establishes the CPUC has regulatory authority over public utilities, including electrical corporations and gas corporations. (California Constitution Article 12)
- Prohibits a public utility, other than certain common carriers, from selling, leasing, assigning, mortgaging, or otherwise disposing of, or encumbering its assets over $5 million that are necessary or useful in the performance of its duties to the public, unless the public utility has secured an order from the CPUC. For a qualified transaction at or below $5 million, approval from the CPUC can be obtained through an advice letter. (Public Utilities Code § 851)
- Prohibits a person or corporation from merging, acquiring, or controlling, any public utility organized and doing business in this state without first securing authorization from the CPUC. Before authorizing the merger, acquisition, or control of any electrical, gas, or telephone corporation organized, existing law requires the CPUC to consider specified criteria and that the transaction is in the public interest. (Public Utilities Code § 854)
- Defines a change of control to include the voluntary or involuntary change in ownership of assets from an electrical or gas corporation to a public entity. Requires specified workforce protections when a change of control occurs. (Public Utilities Code § 854.2)
- Authorizing the use of the advice letter process by water utilities on matters related to "service of recycled water." (Public Utilities Code § 455.1)
- Authorizes the use of advice letters by oil pipelines in seeking rate changes. (Public Utilities Code § 455.3)
FISCAL EFFECT: Unknown. This bill is keyed fiscal, and will be referred to the Assembly Committee on Appropriations for its review.
CONSUMER COST IMPACTS: Unknown.
BACKGROUND:
The History of PUC § 851 – The CPUC must review any transactions involving the selling, buying, merging, or otherwise changing control of a public utility’s assets. These duties of the CPUC are outlined in Public Utilities Code § 851. Section 851 is a broad rule that generally prohibits utilities from allowing other uses or disposal of their property without first obtaining authorization from the CPUC. The original enactment of this statute made no exceptions – any and all transactions needed to go through a formalized ruling of the CPUC.
AB 736 (Horton, Chapter 370, Statutes of 2005), authorized the CPUC to allow the sale or disposal of public utility property through an advice letter process for transactions valued at $5 million or less. Prior to this change, California law required the CPUC to issue an order before a public utility could engage in such a transaction, regardless of value. The intent of AB 736 was to create in statute an expedited review process for low-value transactions and was modeled after an existing CPUC pilot program.
Reduced approval timelines is the main benefit of the advice letter process over the order. The advice letter process allows for approval in less than 120 days. The procedures for issuing an order can take the CPUC up to 18 months. AB 736 was amended to disallow certain low-value transactions from being eligible for the expedited review. Specifically, transactions that trigger any CPUC review under CEQA and transactions that result in a "material impact" on the utility's ratebase were not eligible. Subsequent legislation by Assemblywoman Skinner (AB 698, Skinner, Chapter 370, Statutes of 2009) narrowed these prohibitions to projects where the CPUC is lead agency under CEQA. AB 698 also authorized the CPUC Executive Director to approve the advice letter-qualifying transactions; i.e., uncontested transactions valued at or less than $5 million, not subject to CEQA.
The CPUC Advice Letter Process – An advice letter according to the CPUC is an informal request by a utility for Commission approval, authorization, or other relief, including an informal request for approval for rates, charges, terms or conditions. The advice letter process is dictated by CPUC General Order 96-B and General Order 173. The goal of the process is to provide a quick and simplified review of utility requests that are expected neither to be controversial nor to raise important policy questions. The advice letter process does not provide for an evidentiary hearing. One of the primary uses of the advice letter process is to review a utility’s request to change its tariffs in a manner previously authorized by statute or Commission order. Some transactions that fall under Section 851 are also eligible for the advice letter process. The criteria for transactions that qualify for the advice letter process can be seen in the text box below.
CPUC General Order 173 Outlining § 851 Transactions Eligible for the Advice Letter Process
Typical PUC § 851 Advice Letter Transactions – There is a relatively low number of real estate transactions that are included in the Section 851 advice letter process. All Pacific Gas and Electric (PG&E) transactions since 2023 that fall under this process are described in the table below.[1]
However, these transactions are also known to occur in bursts. One of the principal motivators of AB 698, mentioned above, was PG&E’s large submittal of (potentially hundreds of) applications for conservation easements on its watershed lands to fulfill its first bankruptcy settlement.[2] PG&E was concerned that those applications, which it expected to be non-controversial, would have suffered significant delays if a vote of the CPUC was required for each one.
COMMENTS:
- Author’s Statement. According to the author, “California has some of the most robust utility customer protections in the nation. Unfortunately, some of the processes within the CPUC have become overly time consuming, and seem to favor process over outcomes. AB 420 identifies and streamlines a subset of minor land transactions that are delaying projects like new housing and interconnections to renewables. These delays can add 6-12 months to projects for transactions that are rarely questioned or controversial.”
- Purpose of the Bill. Californians are struggling under the high cost of living in the state.[3] One proposed reason for sky rocketing costs has been attributed to barriers to development in the state.[4] Bureaucracy and permitting is often blamed as a source of these barriers. The goal of this bill is to remove the current requirement for utilities to gain CPUC approval for certain types of real estate transactions under $100,000. This would include, but not be limited to, the transfer of easements required for building housing developments or the granting of conservation easements as was desired by AB 698 (Skinner, Chapter 370, Statutes of 2009). The CPUC’s approval for these real estate transactions is almost always granted; however, it can take from a month to several months to process even the advice letter filings. The goal of this bill is to alleviate one of the barriers to expanded development in the state.
- Opening Loopholes. The main purpose of PUC § 851 is to ensure property and assets bought with ratepayer dollars, continue to serve ratepayer interests, even at their sale. The CPUC is charged with determining whether the transaction serves the public interest, and prevents utilities from selling or leasing crucial infrastructure that could jeopardize service reliability or increase costs to ratepayers. The CPUC also assesses whether the sale delivers fair market value to provide the greatest benefit to ratepayers. For instance, PG&E’s recent application to transfer nearly all of its hydroelectric assets weighed these factors; an application the CPUC denied due to the transfer being found to not be in the public interest.[5]
By exempting specific transactions from review, this bill opens potential loopholes that could provide an opportunity for utilities to bypass such oversight. While this bill does have appropriate limitations – in applying to only easement transfers or relocation agreements, and to only those at $100,000 or less; not something of the magnitude of PG&E’s hydro asset transfer – some potential consequences and concerns may persist, as noted below.
- As written, the types of real estate transactions that qualify for this exemption are unknown to committee, nor well-known within public utility regulation. However, the CPUC has not raised concern with these terms during conversations with the committee; instead, the CPUC notes they are common in real estate or property law.
- The exemptions in the bill could allow utilities to repeatedly sell portions of property valued over $100,000, as long as each individual sale is under $100,000. This is called “daisy chaining” and is currently statutorily forbidden in the advice letter process. No such protection is included in this measure.
- It provides the opportunity for utilities to transfer ownership of depreciated assets. This could include beneficial or substantial assets that now may be worth very little. This type of property ownership transfer may be best performed with CPUC oversight, even if the monetary value is minimal.
- This proposed exemption would lead to the loss of real-time oversight of the transactions; any review would occur in the general rate case after the transaction was complete. As a result, the opportunity to protest a transaction would be significantly diminished. This bill seeks to limit this consequence by constraining the exemption to smaller-value transactions.
- San Diego Gas & Electric (SDG&E) reports that no Section 851 Advice Letter has been denied over the last five years.[6] This suggests that these transactions are uncontroversial and that the advice letter process for Section 851 real estate transactions is essentially a rubber stamp that only adds delays. This may be a fair assertion for the current process; however, if this process transforms to have no oversight, this may no longer be accurate. It may be that the CPUC review is still performing a function by ensuring the banality of these transactions. If oversight is lost and the nature of the real estate transactions change, eventually this will be reported in the General Rate Case of the utility. However delays in acquiring this information and the density of the information provided in the GRC could make it difficult for the CPUC to hold utilities accountable if they begin to use this mechanism in creative or undesirable ways.
In order to address some of these concerns and to promote greater transparency and opportunity for corrective action, while balancing the benefits of the bill in removing administrative barriers when arbitrary or unnecessary, the committee recommends that the bill be amended to require utilities to report each exempted transaction in their General Rate Case. This requirement is in alignment with what occurs under the advice letter process, mentioned above, where financial proceeds from the transactions may be booked to a memorandum account for distribution between shareholders and ratepayers during the next general rate case or other applicable proceeding for that utility.
- The $100,000 Question. This bill exempts specific real estate transactions under $100,000 from any CPUC review, even the more expedited advice letter process. Looking at the number of advice letters relative to the value of the transaction, it appears that the vast majority of qualifying real estate transactions conducted by SDG&E in the last five years fall under $10,000 (Figure 1).[7] It is unclear to the committee the distribution of advice letter filings from the other utilities subject to this bill – i.e., those with gross annual California revenues of five hundred million dollars, which includes PG&E, Southern California Edison, SDG&E, Southern California Gas, and (potentially) California Water.[8] Given the lack of clarity in what would be captured by the monetary threshold in the bill, the author may wish to consider lowering the threshold to $10,000, where the majority of past projects, at least for SDG&E, would have received the benefits of this measure.
- Prior Legislation.
SB 550 (Hill) requires the CPUC to review specified safety elements for any proposed merger, acquisition or change in control of an electrical or gas IOU. It conditions approval of the transaction on whether it is in the public interest. This bill also clarifies the reviews required by the CPUC for any other asset transactions with a public utility. Status: Chapter 409, Statutes of 2019.
AB 1054 (Holden), among its many provisions, expanded the definition of change of control to include the voluntary or involuntary transfer of an IOU’s assets to a public entity and made changes to the definition for change of control that included specified criteria and thresholds related to the treatment of the workforce. Status: Chapter 79, Statutes of 2019.
AB 698 (Skinner) relaxes that requirement by allowing the CPUC staff to approve the transfer without a vote of the commissioners if the proposal is valued at less than $5 million and is uncontested. Status: Chapter 370, Statutes of 2009.
AB 735 (Horton) Modifies the California Public Utilities Commission's (PUC's) approval process for the sale or transfer of public utility assets by allowing public utilities to sell, or otherwise transfer property valued at less than $5 million if the transfer is approved by PUC through a 120-day advice letter process rather than through a formal proceeding. Status: Chapter 370, Statutes of 2005
SB 52 (Rosenthal) established criteria that the CPUC must consider in reviewing a merger, acquisition, or change of control related to an IOU. Status: Chapter 484, Statutes of 1989.
REGISTERED SUPPORT / OPPOSITION:
Support
California Building Industry Association
Support If Amended
San Diego Gas and Electric Company
Opposition
None on file.
Analysis Prepared by: Laura Shybut / U. & E. / (916) 319-2083
https://www.pge.com/tariffs/en/advice-letter.html, Accessed April 19, 2025 ↑
See Senate Floor Analysis; AB 698 (Skinner); August 17. 2009; https://lis.calegis.net/LISWeb/faces/bills/billxmlxslasamend.xhtml;jsessionid=AVhXZe0Jh0RiLIWn5cARHG6oJqMRLWv1vImJt5aNVC9SmaTA9NX-!1841777440!-1579391847# ↑
Robin Rothstein, Chris Jennings, “Examining the Cost of Living By State”, Forbes, July 15, 2024. ↑
Ben Christopher and Manuela Tobias, “Californians: Here’s why your housing costs are so high,” CalMatters, October 15, 2024. ↑
CPUC Decision 24-05-004, Decision Denying Application, A.22-09-018, May 10, 2024; http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M531/K375/531375060.PDF ↑
Personal Communication, SDG&E, February 27, 2025 ↑
Personal Communication, SDG&E, February 27, 2025 ↑
California Water Service Group, SEC 2024 Summary Annual Report, https://www.calwatergroup.com/investors/financials-filings-reports/sec-filings/content/0001104659-25-035520/0001104659-25-035520.pdf ↑
Bill Author
Bill Co-Author(s):