AB 472: Energy: integrated energy policy report: port infrastructure for offshore wind energy development.
- Session Year: 2025-2026
- House: Assembly
- Latest Version Date: 2025-04-23
Current Status:
Failed
(2026-02-02: From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in coordination with specified agencies, to develop a strategic plan for offshore wind energy developments installed off the California coast in federal waters, and requires the Energy Commission to submit the strategic plan to the Natural Resources Agency and the Legislature on or before June 30, 2023, as specified. Existing law requires the Energy Commission, in coordination with relevant state and local agencies, to develop a plan to improve waterfront facilities that could support a range of floating offshore wind energy development activities, as specified.
Existing law, the California Infrastructure Planning Act, requires the Governor to annually submit a 5-year infrastructure plan to the Legislature in conjunction with the Governors Budget. Under existing law, infrastructure means real property, including land and improvements to the land, structures and equipment integral to the operation of structures, easements, rights-of-way, and other forms of interest in property, roadways, and water conveyances.Existing law requires the Energy Commission, beginning November 1, 2003, and biennially thereafter, to adopt an integrated energy policy report that contains an overview of major energy trends and issues facing the state, presents policy recommendations based on an in-depth and integrated analysis of the most current and pressing energy issues facing the state, and includes an assessment and forecast of system reliability and the need for resource additions, efficiency, and conservation, as specified.
This bill would amend the definition of infrastructure described above to include port infrastructure for offshore wind energy development, and would require the 5-year infrastructure plan to include, beginning in the 202728 fiscal year, require the Energy Commission, as part of the 2027 edition of the integrated energy policy report and each edition thereafter, and contingent upon an appropriation for this purpose, to include an assessment of funding needs for port infrastructure for offshore wind energy development, as specified. The bill would require the Governor, Energy Commission, in consultation with specified entities, to assess include in the assessment any federal, state, and local funding opportunities, including general obligation bonds and funding from the private sector, that can help build port infrastructure for offshore wind energy development.
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in coordination with specified agencies, to develop a strategic plan for offshore wind energy developments installed off the California coast in federal waters, and requires the Energy Commission to submit the strategic plan to the Natural Resources Agency and the Legislature on or before June 30, 2023, as specified. Existing law requires the Energy Commission, in coordination with relevant state and local agencies, to develop a plan to improve waterfront facilities that could support a range of floating offshore wind energy development activities, as specified.
Existing law, the California Infrastructure Planning Act, requires the Governor to annually submit a 5-year infrastructure plan to the Legislature in conjunction with the Governors Budget. Under existing law, infrastructure means real property, including land and improvements to the land, structures and equipment integral to the operation of structures, easements, rights-of-way, and other forms of interest in property, roadways, and water conveyances.
This bill would amend the definition of infrastructure described above to include port infrastructure for offshore wind energy development, and would require the 5-year infrastructure plan to include, beginning in the 202728 fiscal year, and contingent upon an appropriation for this purpose, an assessment of funding needs for port infrastructure for offshore wind energy development, as specified. The bill would require the Governor, in consultation with specified entities, to assess federal, state, and local funding opportunities, including general obligation bonds and funding from the private sector, that can help build port infrastructure for offshore wind energy development.
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in coordination with specified agencies, to develop a strategic plan for offshore wind energy developments installed off the California coast in federal waters, and requires the Energy Commission to submit the strategic plan to the Natural Resources Agency and the Legislature on or before June 30, 2023, as specified. Existing law requires the Energy Commission, in coordination with relevant state and local agencies, to develop a plan to improve waterfront facilities that could support a range of floating offshore wind energy development activities, as specified.
Existing law, the California Infrastructure Planning Act, requires the Governor to annually submit a 5-year infrastructure plan to the Legislature in conjunction with the Governors Budget. Under existing law, infrastructure means real property, including land and improvements to the land, structures and equipment integral to the operation of structures, easements, rights-of-way, and other forms of interest in property, roadways, and water conveyances.
This bill would amend the definition of infrastructure described above to include port infrastructure for offshore wind energy development, and would require the 5-year infrastructure plan to include, beginning in the 202728 fiscal year, and contingent upon an appropriation for this purpose, an assessment of funding needs for port infrastructure for offshore wind energy development, as specified. The bill would require the Governor, in consultation with specified entities, to assess federal, state, and local funding opportunities, including general obligation bonds and funding from the private sector, that can help build port infrastructure for offshore wind energy development.
The Legislature finds and declares all of the following:
(a)Under the California Infrastructure Planning Act (Chapter 606 of the Statutes of 1999), the Governor is required to annually submit a five-year infrastructure plan to the Legislature in conjunction with the Governors Budget. Existing law states the intent of the Legislature that this plan be updated annually and identify state infrastructure needs and set out priorities for funding. Under existing law, the plan need not identify specific infrastructure projects to be funded, but it shall be sufficiently detailed to provide a clear understanding of the type and amount of infrastructure to be funded and the programmatic objectives to be achieved by this funding. Under existing law, the infrastructure plan is required to contain, among other things, information on support for infrastructure needs and an evaluation of the impact of the new state debt on the states existing overall debt position if the plan proposes the issuance of new state debt.
(b)Under existing law, infrastructure means real property, including land and improvements to the land, structures and equipment integral to the operation of structures, easements, rights-of-way, and other forms of interest in property, roadways, and water conveyances.
(c)The infrastructure plan is required to contain specified information for the five years that it covers, including infrastructure requested by state agencies, aggregate funding for transportation, infrastructure needs for public schools and instructional support facility needs for public higher education institutions, as provided, the estimated cost of providing this infrastructure, and a proposal for funding the infrastructure.
(d)The 100 Percent Clean Energy Act of 2018 enacted by Senate Bill 100 (Chapter 312 of the Statutes of 2018) amended the California Renewables Portfolio Standard Program in order to attain targets for total retail sales generation, and required that eligible renewable energy resources supply 60 percent of all retail sales of electricity to California end-use customers by December 31, 2030, and eligible renewable and zero-carbon resources supply 100 percent of all retail sales of electricity to California end-use customers by December 31, 2045.
(e)The publication 2021 SB 100 Joint Agency Report: Achieving 100 Percent Clean Electricity in California: An Initial Assessment, prepared by the State Energy Resources Conservation and Development Commission (Energy Commission), the Public Utilities Commission, and the State Air Resources Board, includes a review of the policy of supplying 100 percent of retail sales and state loads with eligible renewable and zero-carbon resources in California by 2045, assesses various pathways to achieve the policy, and provides an initial assessment of costs and benefits.
(f)Californias offshore waters are a prime location for new floating offshore wind energy development projects that will help the state meet its bold renewable energy targets. Under existing law, the Energy Commission was required to develop a strategic plan by June 30, 2023, in preparation for advancing the development of offshore wind off the coast of California. In the Energy Commissions report titled, Offshore Wind Energy Development off the California Coast: Maximum Feasible Capacity and Megawatt Planning Goals for 2030 and 2045, preliminary findings of the report set planning goals of 2,000 to 5,000 megawatts of offshore wind by 2030, and 25,000 megawatts by 2045.
(g)On July 10, 2024, the Energy Commission submitted the final Assembly Bill 525 Offshore Wind Strategic Plan to the Natural Resources Agency and the Legislature. The final strategic plan discusses various aspects of offshore wind energy potential in California, including economic and workforce development benefits, transmission technology, transmission planning and interconnection, offshore wind permitting, potential impacts from offshore wind projects, identification of port space and infrastructure, and port infrastructure needs. Under existing law, the strategic plan is required to include a detailed assessment of the necessary investments in California seaports to support offshore wind energy activities, including construction, assembly, operations, and maintenance. The assessment is required to consider the potential availability of land and water acreage at each port, including competing and current uses, infrastructure feasibility, deep water access, bridge height restrictions, and the potential impact to natural and cultural resources, including coastal resources, fisheries, and impacts on Native American and Indigenous people.
(h)The strategic plan is also required to strive for compatibility with other harbor tenants and ocean users to ensure that the local benefits related to offshore wind energy construction complement other local industries when considering port retrofits, and it is required to emphasize and prioritize actions that will improve port infrastructure to support land-based work for the local workforce.
(i)A key finding from the final strategic plan focuses on the necessary upgrades for port and waterfront infrastructure to accommodate the offshore wind industry in California, which will require specialized seaport and waterfront facilities to build, assemble, and service the wind turbines needed to meet the Assembly Bill 525 offshore wind planning goals. Without a port site to assemble the turbine components, the industry will not be able to develop in California.
(j)The final strategic plan also notes that no port site in California can serve all the needs of the offshore wind industry. Instead, a coordinated multiport strategy will be needed and could require more than 16 large and 10 small port sites, including staging, integration, operations, and maintenance sites, to support offshore wind development over the next decade or more. These sites are required to be developed as soon as possible, and have an estimated cost of at least $12 billion.
(k)The Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024, approved by the voters as Proposition 4 at the November 5, 2024, statewide general election, authorized the issuance of general obligation bonds in the amount of $10 billion to fund a variety of projects across the state related to safe drinking water, flood protection, wildfire prevention, natural lands, and clean energy.
(l)The Proposition 4 funding includes, upon appropriation by the Legislature, $475,000,000 to the Energy Commission to support construction of publicly owned port facilities for manufacturing, assembly, staging, and integration of entitlements and components of offshore wind generation, and upgrades to port facilities, consistent with the strategic plan developed pursuant to Section 25991 of the Public Resources Code.
(m)The Proposition 4 funding represents an initial investment to upgrade ports for offshore wind development. Requiring the state to develop an offshore wind infrastructure plan, and continued significant state, federal, and private investment, will help ensure that the state is on a path toward offshore wind development.
SEC. 2.Section 13101 of the Government Code is amended to read:13101.As used in this article, infrastructure means port infrastructure for offshore wind energy development and real property, including land and improvements to the land, structures and equipment integral to the operation of structures, easements, rights-of-way, and other forms of interest in property, roadways, and water conveyances.SEC. 3.Section 13102 of the Government Code is amended to read:13102.(a)In conjunction with the Governors Budget submitted pursuant to Section 13337, the Governor shall submit annually a proposed five-year infrastructure plan to the Legislature. This plan shall cover a five-fiscal-year period beginning with the fiscal year that is the same as that covered by the Governors Budget with which it is submitted.(b)The infrastructure plan shall contain the following information for the five years that it covers:(1)(A)Identification of new, rehabilitated, modernized, improved, or renovated infrastructure requested by state agencies.(B)Aggregate funding for transportation as identified in the four-year State Transportation Improvement Program Fund Estimate prepared pursuant to Sections 14524 and 14525.(C)Infrastructure needs for Kindergarten through grade 12 public schools necessary to accommodate increased enrollment, class size reduction, and school modernization.(D)The instructional and instructional support facilities needs for the University of California, the California State University, and the California Community Colleges.(E)Construction, operation, and maintenance for facilities of the State Plan of Flood Control, support for infrastructure needs pursuant to Part 9 (commencing with Section 12980) of Division 6 of the Water Code, support for infrastructure needs pursuant to Chapter 2 (commencing with Section 12310) of Part 4.8 of Division 6 of the Water Code, and aggregate funding for the state share of nonfederal capital costs for flood control projects located outside of the Central Valley.(F)(i)Beginning with the 202728 fiscal year, and contingent upon an appropriation by the Legislature for purposes of this subparagraph, an assessment of funding needs for port infrastructure for offshore wind energy development consistent with recommendations in the strategic plan for offshore wind energy developments installed off the California coast in federal waters developed pursuant to Section 25991 of the Public Resources Code and the seaport plan to improve waterfront facilities that could support a range of floating offshore wind energy development activities pursuant to Section 25991.3 of the Public Resources Code.(ii)For purposes of the assessment described in clause (i), port infrastructure subject to the assessment includes construction and staging of foundations, manufacturing of components, final assembly, and long-term operations and maintenance facilities associated with offshore wind energy development.(iii)The Governor shall, in consultation with the Department of Finance, the Office of Land Use and Climate Innovation, the Governors Office of Business and Economic Development, the State Energy Resources Conservation and Development Commission, the State Lands Commission, and the California Workforce Development Board, include in the assessment pursuant to clause (i) any federal, state, and local funding opportunities, including general obligation bonds and funding opportunities from the private sector, that can help build port infrastructure for offshore wind energy development.(iv)The assessment described in clause (i) shall be in addition to, and shall not be a substitute for, other assessments that may be required for ports to determine specific local needs for accessing funds for offshore wind energy development.(2)The estimated cost of providing the infrastructure identified in paragraph (1).(3)A proposal for funding the infrastructure identified in paragraph (1) that includes all of the following:(A)Criteria and priorities used to identify and select the infrastructure it proposes to fund, including criteria used to identify and select infrastructure that by January 1, 2005, shall be consistent with the state planning priorities specified pursuant to Section 65041.1 for infrastructure requested by state agencies pursuant to subparagraph (A) of paragraph (1).(B)Sources of funding, including, but not limited to, General Fund, state special funds, federal funds, general obligation bonds, lease-revenue bonds, and installment purchases.(C)An evaluation of the impact of the new state debt on the states existing overall debt position if the plan proposes the issuance of new state debt.(D)(i)Recommended specific projects for funding or the recommended type and amount of infrastructure to be funded in order to meet programmatic objectives that shall be identified in the proposal.(ii)Any capital outlay or local assistance appropriations intended to fund infrastructure included in the Governors Budget shall derive from, and be encompassed by, the funding proposal contained in the plan.SEC. 4.Section 13103 of the Government Code is amended to read:13103.By January 1, 2005, if a state agency requests infrastructure pursuant to subparagraph (A) of paragraph (1) of subdivision (b) of Section 13102, that agency shall specify how that infrastructure is consistent with the state planning priorities specified pursuant to Section 65041.1. The Governor may also order any entity of state government to assist in preparation of the infrastructure plan.SEC. 5.Section 65042 of the Government Code is amended to read:65042.Every officer, agency, department, or instrumentality of state government, including, but not limited to, all trustee agencies as defined in Section 21070 of the Public Resources Code, shall do all of the following:(a)Cooperate in the preparation and maintenance of the State Environmental Goals and Policy Report.(b)By January 1, 2005, ensure that their entitys functional plan is consistent with the state planning priorities specified pursuant to Section 65041.1 and annually demonstrate to the office, and to the Department of Finance when requesting infrastructure pursuant to paragraph (1) of subdivision (b) of Section 13102, how the plans are consistent with those priorities.(c)Comply with any request for advice, assistance, information, or other material.SEC. 2Section 25302.1 is added to the Public Resources Code, to read:25302.1.(a)(1)As part of the 2027 edition of the integrated energy policy report and each edition thereafter, and contingent upon an appropriation by the Legislature for purposes of this section, the commission shall include an assessment of funding needs for port infrastructure for offshore wind energy development consistent with the recommendations in the strategic plan for offshore wind energy developments installed off the California coast in federal waters developed pursuant to Section 25991 and the plan to improve waterfront facilities that could support a range of floating offshore wind energy development activities pursuant to Section 25991.3.
(2)For purposes of the assessment described in paragraph (1), both of the following shall apply:
(A)Port infrastructure subject to the assessment includes construction and staging of foundations, manufacturing of components, final assembly, and long-term operations and maintenance facilities associated with offshore wind energy development.
(B)The assessment shall be in addition to, and shall not be a substitute for, any other assessment that may be required for ports to determine specific local needs for accessing funds for offshore wind energy development.
(b)The commission shall, in consultation with the Department of Finance, the Office of Land Use and Climate Innovation, the Governors Office of Business and Economic Development, the State Lands Commission, and the California Workforce Development Board, include in the assessment required by this section any federal, state, and local funding opportunities, including general obligation bonds and funding opportunities from the private sector, that can help build port infrastructure for offshore wind energy development.
The Legislature finds and declares all of the following:
(a)Under the California Infrastructure Planning Act (Chapter 606 of the Statutes of 1999), the Governor is required to annually submit a five-year infrastructure plan to the Legislature in conjunction with the Governors Budget. Existing law states the intent of the Legislature that this plan be updated annually and identify state infrastructure needs and set out priorities for funding. Under existing law, the plan need not identify specific infrastructure projects to be funded, but it shall be sufficiently detailed to provide a clear understanding of the type and amount of infrastructure to be funded and the programmatic objectives to be achieved by this funding. Under existing law, the infrastructure plan is required to contain, among other things, information on support for infrastructure needs and an evaluation of the impact of the new state debt on the states existing overall debt position if the plan proposes the issuance of new state debt.
(b)Under existing law, infrastructure means real property, including land and improvements to the land, structures and equipment integral to the operation of structures, easements, rights-of-way, and other forms of interest in property, roadways, and water conveyances.
(c)The infrastructure plan is required to contain specified information for the five years that it covers, including infrastructure requested by state agencies, aggregate funding for transportation, infrastructure needs for public schools and instructional support facility needs for public higher education institutions, as provided, the estimated cost of providing this infrastructure, and a proposal for funding the infrastructure.
(d)The 100 Percent Clean Energy Act of 2018 enacted by Senate Bill 100 (Chapter 312 of the Statutes of 2018) amended the California Renewables Portfolio Standard Program in order to attain targets for total retail sales generation, and required that eligible renewable energy resources and zero-carbon resources supply 60 percent of all retail sales of electricity to California end-use customers by December 31, 2030, and eligible renewable and zero-carbon resources supply 100 percent of all retail sales of electricity to California end-use customers by December 31, 2045.
(e)The publication 2021 SB 100 Joint Agency Report: Achieving 100 Percent Clean Electricity in California: An Initial Assessment, prepared by the State Energy Resources Conservation and Development Commission (Energy Commission), the Public Utilities Commission, and the State Air Resources Board, includes a review of the policy of supplying 100 percent of retail sales and state loads with eligible renewable and zero-carbon resources in California by 2045, assesses various pathways to achieve the policy, and provides an initial assessment of costs and benefits.
(f)Californias offshore waters are a prime location for new floating offshore wind energy development projects that will help the state meet its bold renewable energy targets. Under existing law, the Energy Commission was required to develop a strategic plan by June 30, 2023, in preparation for advancing the development of offshore wind off the coast of California. In the Energy Commissions report titled, Offshore Wind Energy Development off the California Coast: Maximum Feasible Capacity and Megawatt Planning Goals for 2030 and 2045, preliminary findings of the report set planning goals of 2,000 to 5,000 megawatts of offshore wind by 2030, and 25,000 megawatts by 2045.
(g)On January 19, July 10, 2024, the Energy Commission submitted the draft final Assembly Bill 525 Offshore Wind Strategic Plan to the Natural Resources Agency and the Legislature. The draft final strategic plan discusses various aspects of offshore wind energy potential in California, including economic and workforce development benefits, transmission technology, transmission planning and interconnection, offshore wind permitting, potential impacts from offshore wind projects, identification of port space and infrastructure, and port infrastructure needs. Under existing law, the strategic plan is required to include a detailed assessment of the necessary investments in California seaports to support offshore wind energy activities, including construction, assembly, operations, and maintenance. The assessment is required to consider the potential availability of land and water acreage at each port, including competing and current uses, infrastructure feasibility, deep water access, bridge height restrictions, and the potential impact to natural and cultural resources, including coastal resources, fisheries, and impacts on Native American and Indigenous people.
(h)The strategic plan is also required to strive for compatibility with other harbor tenants and ocean users to ensure that the local benefits related to offshore wind energy construction complement other local industries when considering port retrofits, and it is required to emphasize and prioritize actions that will improve port infrastructure to support land-based work for the local workforce.
(i)A key finding from the draft final strategic plan focuses on the necessary upgrades for port and waterfront infrastructure to accommodate the offshore wind industry in California, which will require specialized seaport and waterfront facilities to build, assemble, and service the wind turbines needed to meet the Assembly Bill 525 offshore wind planning goals. Without a port site to assemble the turbine components, the industry will not be able to develop in California.
(j)The draft final strategic plan also notes that no port site in California can serve all the needs of the offshore wind industry. Instead, a coordinated multiport strategy will be needed and could require more than 16 large and 10 small port sites, including staging, integration, operations, and maintenance sites, to support offshore wind development over the next decade or more. These sites are required to be developed as soon as possible, and have an estimated cost of at least $12 billion.
(k)The Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024, approved by the voters as Proposition 4 at the November 5, 2024, statewide general election, authorized the issuance of general obligation bonds in the amount of $10 billion to fund a variety of projects across the state related to safe drinking water, flood protection, wildfire prevention, natural lands, and clean energy.
(l)The Proposition 4 funding includes, upon appropriation by the Legislature, $475,000,000 to the Energy Commission to support construction of publicly owned port facilities for manufacturing, assembly, staging, and integration of entitlements and components of offshore wind generation, and upgrades to port facilities, consistent with the strategic plan developed pursuant to Section 25991 of the Public Resources Code.
(m)The Proposition 4 funding represents an initial investment to upgrade ports for offshore wind development. Requiring the state to develop an offshore wind infrastructure plan, and continued significant state, federal, and private investment, will help ensure that the state can meet the goal of building 5 gigawatts of offshore wind energy by 2030, and 25 gigawatts by 2045. is on a path toward offshore wind development.
SEC. 2.Section 13101 of the Government Code is amended to read:13101.As used in this article, infrastructure means port infrastructure for offshore wind energy development and real property, including land and improvements to the land, structures and equipment integral to the operation of structures, easements, rights-of-way, and other forms of interest in property, roadways, and water conveyances.
SEC. 3.Section 13102 of the Government Code is amended to read:13102.(a)In conjunction with the Governors Budget submitted pursuant to Section 13337, the Governor shall submit annually a proposed five-year infrastructure plan to the Legislature. This plan shall cover a five-fiscal-year period beginning with the fiscal year that is the same as that covered by the Governors Budget with which it is submitted.
(b)The infrastructure plan shall contain the following information for the five years that it covers:
(1)(A)Identification of new, rehabilitated, modernized, improved, or renovated infrastructure requested by state agencies.
(B)Aggregate funding for transportation as identified in the four-year State Transportation Improvement Program Fund Estimate prepared pursuant to Sections 14524 and 14525.
(C)Infrastructure needs for Kindergarten through grade 12 public schools necessary to accommodate increased enrollment, class size reduction, and school modernization.
(D)The instructional and instructional support facilities needs for the University of California, the California State University, and the California Community Colleges.
(E)Construction, operation, and maintenance for facilities of the State Plan of Flood Control, support for infrastructure needs pursuant to Part 9 (commencing with Section 12980) of Division 6 of the Water Code, support for infrastructure needs pursuant to Chapter 2 (commencing with Section 12310) of Part 4.8 of Division 6 of the Water Code, and aggregate funding for the state share of nonfederal capital costs for flood control projects located outside of the Central Valley.
(F)(i)Beginning with the 202728 fiscal year, and contingent upon an appropriation by the Legislature for purposes of this subparagraph, an assessment of funding needs for port infrastructure for offshore wind energy development consistent with recommendations in the strategic plan for offshore wind energy developments installed off the California coast in federal waters developed pursuant to Section 25991 of the Public Resources Code and the seaport plan to improve waterfront facilities that could support a range of floating offshore wind energy development activities pursuant to Section 25991.3 of the Public Resources Code.
(ii)For purposes of the assessment described in clause (i), port infrastructure subject to the assessment includes construction and staging of foundations, manufacturing of components, final assembly, and long-term operations and maintenance facilities associated with offshore wind energy development.
(iii)The Governor shall, in consultation with the Department of Finance, the Office of Land Use and Climate Innovation, the Governors Office of Business and Economic Development, the State Energy Resources Conservation and Development Commission, the State Lands Commission, and the California Workforce Development Board, include in the assessment pursuant to clause (i) any federal, state, and local funding opportunities, including general obligation bonds and funding opportunities from the private sector, that can help build port infrastructure for offshore wind energy development.
(iv)The assessment described in clause (i) shall be in addition to, and shall not be a substitute for, other assessments that may be required for ports to determine specific local needs for accessing funds for offshore wind energy development.
(2)The estimated cost of providing the infrastructure identified in paragraph (1).
(3)A proposal for funding the infrastructure identified in paragraph (1) that includes all of the following:
(A)Criteria and priorities used to identify and select the infrastructure it proposes to fund, including criteria used to identify and select infrastructure that by January 1, 2005, shall be consistent with the state planning priorities specified pursuant to Section 65041.1 for infrastructure requested by state agencies pursuant to subparagraph (A) of paragraph (1).
(B)Sources of funding, including, but not limited to, General Fund, state special funds, federal funds, general obligation bonds, lease-revenue bonds, and installment purchases.
(C)An evaluation of the impact of the new state debt on the states existing overall debt position if the plan proposes the issuance of new state debt.
(D)(i)Recommended specific projects for funding or the recommended type and amount of infrastructure to be funded in order to meet programmatic objectives that shall be identified in the proposal.
(ii)Any capital outlay or local assistance appropriations intended to fund infrastructure included in the Governors Budget shall derive from, and be encompassed by, the funding proposal contained in the plan.
SEC. 4.Section 13103 of the Government Code is amended to read:13103.By January 1, 2005, if a state agency requests infrastructure pursuant to subparagraph (A) of paragraph (1) of subdivision (b) of Section 13102, that agency shall specify how that infrastructure is consistent with the state planning priorities specified pursuant to Section 65041.1. The Governor may also order any entity of state government to assist in preparation of the infrastructure plan.
SEC. 5.Section 65042 of the Government Code is amended to read:65042.Every officer, agency, department, or instrumentality of state government, including, but not limited to, all trustee agencies as defined in Section 21070 of the Public Resources Code, shall do all of the following:
(a)Cooperate in the preparation and maintenance of the State Environmental Goals and Policy Report.
(b)By January 1, 2005, ensure that their entitys functional plan is consistent with the state planning priorities specified pursuant to Section 65041.1 and annually demonstrate to the office, and to the Department of Finance when requesting infrastructure pursuant to paragraph (1) of subdivision (b) of Section 13102, how the plans are consistent with those priorities.
(c)Comply with any request for advice, assistance, information, or other material.
REVISIONS: HeadingLines 1 and 3.The Legislature finds and declares all of the following:
(a)Under the California Infrastructure Planning Act (Chapter 606 of the Statutes of 1999), the Governor is required to annually submit a five-year infrastructure plan to the Legislature in conjunction with the Governors Budget. Existing law states the intent of the Legislature that this plan be updated annually and identify state infrastructure needs and set out priorities for funding. Under existing law, the plan need not identify specific infrastructure projects to be funded, but it shall be sufficiently detailed to provide a clear understanding of the type and amount of infrastructure to be funded and the programmatic objectives to be achieved by this funding. Under existing law, the infrastructure plan is required to contain, among other things, information on support for infrastructure needs and an evaluation of the impact of the new state debt on the states existing overall debt position if the plan proposes the issuance of new state debt.
(b)Under existing law, infrastructure means real property, including land and improvements to the land, structures and equipment integral to the operation of structures, easements, rights-of-way, and other forms of interest in property, roadways, and water conveyances.
(c)The infrastructure plan is required to contain specified information for the five years that it covers, including infrastructure requested by state agencies, aggregate funding for transportation, infrastructure needs for public schools and instructional support facility needs for public higher education institutions, as provided, the estimated cost of providing this infrastructure, and a proposal for funding the infrastructure.
(d)The 100 Percent Clean Energy Act of 2018 enacted by Senate Bill 100 (Chapter 312 of the Statutes of 2018) amended the California Renewables Portfolio Standard Program in order to attain targets for total retail sales generation, and required that eligible renewable energy resources and zero-carbon resources supply 60 percent of all retail sales of electricity to California end-use customers by December 31, 2030, and supply 100 percent of all retail sales of electricity to California end-use customers by December 31, 2045.
(e)The publication 2021 SB 100 Joint Agency Report: Achieving 100 Percent Clean Electricity in California: An Initial Assessment, prepared by the State Energy Resources Conservation and Development Commission (Energy Commission), the Public Utilities Commission, and the State Air Resources Board, includes a review of the policy of supplying 100 percent of retail sales and state loads with renewable and zero-carbon resources in California by 2045, assesses various pathways to achieve the policy, and provides an initial assessment of costs and benefits.
(f)Californias offshore waters are a prime location for new floating offshore wind energy development projects that will help the state meet its bold renewable energy targets. Under existing law, the Energy Commission was required to develop a strategic plan by June 30, 2023, in preparation for advancing the development of offshore wind off the coast of California. In the Energy Commissions report titled, Offshore Wind Energy Development off the California Coast: Maximum Feasible Capacity and Megawatt Planning Goals for 2030 and 2045, preliminary findings of the report set planning goals of 2,000 to 5,000 megawatts of offshore wind by 2030, and 25,000 megawatts by 2045.
(g)On January 19, 2024, the Energy Commission submitted the draft Assembly Bill 525 Offshore Wind Strategic Plan to the Natural Resources Agency and the Legislature. The draft strategic plan discusses various aspects of offshore wind energy potential in California, including economic and workforce development benefits, transmission technology, transmission planning and interconnection, offshore wind permitting, potential impacts from offshore wind projects, identification of port space and infrastructure, and port infrastructure needs. Under existing law, the strategic plan is required to include a detailed assessment of the necessary investments in California seaports to support offshore wind energy activities, including construction, assembly, operations, and maintenance. The assessment is required to consider the potential availability of land and water acreage at each port, including competing and current uses, infrastructure feasibility, deep water access, bridge height restrictions, and the potential impact to natural and cultural resources, including coastal resources, fisheries, and impacts on Native American and Indigenous people.
(h)The strategic plan is also required to strive for compatibility with other harbor tenants and ocean users to ensure that the local benefits related to offshore wind energy construction complement other local industries when considering port retrofits, and it is required to emphasize and prioritize actions that will improve port infrastructure to support land-based work for the local workforce.
(i)A key finding from the draft strategic plan focuses on the necessary upgrades for port and waterfront infrastructure to accommodate the offshore wind industry in California, which will require specialized seaport and waterfront facilities to build, assemble, and service the wind turbines needed to meet the Assembly Bill 525 offshore wind planning goals. Without a port site to assemble the turbine components, the industry will not be able to develop in California.
(j)The draft strategic plan also notes that no port site in California can serve all the needs of the offshore wind industry. Instead, a coordinated multiport strategy will be needed and could require more than 16 large and 10 small port sites, including staging, integration, operations, and maintenance sites, to support offshore wind development over the next decade or more. These sites are required to be developed as soon as possible, and have an estimated cost of at least $12 billion.
(k)The Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024, approved by the voters as Proposition 4 at the November 5, 2024, statewide general election, authorized the issuance of general obligation bonds in the amount of $10 billion to fund a variety of projects across the state related to safe drinking water, flood protection, wildfire prevention, natural lands, and clean energy.
(l)The Proposition 4 funding includes, upon appropriation by the Legislature, $475,000,000 to the Energy Commission to support construction of publicly owned port facilities for manufacturing, assembly, staging, and integration of entitlements and components of offshore wind generation, and upgrades to port facilities, consistent with the strategic plan developed pursuant to Section 25991 of the Public Resources Code.
(m)The Proposition 4 funding represents an initial investment to upgrade ports for offshore wind development. Requiring the state to develop an offshore wind infrastructure plan, and continued significant state, federal, and private investment, will help ensure that the state can meet the goal of building 5 gigawatts of offshore wind energy by 2030, and 25 gigawatts by 2045.
SEC. 2.Section 13101 of the Government Code is amended to read:13101.As used in this article, infrastructure means port infrastructure for offshore wind energy development and real property, including land and improvements to the land, structures and equipment integral to the operation of structures, easements, rights-of-way rights-of-way, and other forms of interest in property, roadways, and water conveyances.
SEC. 3.Section 13102 of the Government Code is amended to read:13102.(a)In conjunction with the Governors Budget submitted pursuant to Section 13337, the Governor shall submit annually a proposed five-year infrastructure plan to the Legislature. This plan shall cover a five-fiscal-year period beginning with the fiscal year that is the same as that covered by the Governors Budget with which it is submitted.
(b)The infrastructure plan shall contain the following information for the five years that it covers:
(a)(1)(1)(A)Identification of new, rehabilitated, modernized, improved, or renovated infrastructure requested by state agencies.
(2)(B)Aggregate funding for transportation as identified in the four-year State Transportation Improvement Program Fund Estimate prepared pursuant to Sections 14524 and 14525.
(3)(C)Infrastructure needs for Kindergarten through grade 12 public schools necessary to accommodate increased enrollment, class size reduction, and school modernization.
(4)(D)The instructional and instructional support facilities needs for the University of California, the California State University, and the California Community Colleges.
(5)(E)Construction, operation, and maintenance for facilities of the State Plan of Flood Control, support for infrastructure needs pursuant to Part 9 (commencing with Section 12980) of Division 6 of the Water Code, support for infrastructure needs pursuant to Chapter 2 (commencing with Section 12310) of Part 4.8 of Division 6 of the Water Code, and aggregate funding for the state share of nonfederal capital costs for flood control projects located outside of the Central Valley.
(F)(i)Beginning with the 202728 fiscal year, and contingent upon an appropriation by the Legislature for purposes of this subparagraph, an assessment of funding needs for port infrastructure for offshore wind energy development consistent with recommendations in the strategic plan for offshore wind energy developments installed off the California coast in federal waters developed pursuant to Section 25991 of the Public Resources Code and the seaport plan to improve waterfront facilities that could support a range of floating offshore wind energy development activities pursuant to Section 25991.3 of the Public Resources Code.
(ii)For purposes of the assessment described in clause (i), port infrastructure subject to the assessment includes construction and staging of foundations, manufacturing of components, final assembly, and long-term operations and maintenance facilities associated with offshore wind energy development.
(iii)The Governor shall, in consultation with the Department of Finance, the Office of Land Use and Climate Innovation, the Governors Office of Business and Economic Development, the State Energy Resources Conservation and Development Commission, the State Lands Commission, and the California Workforce Development Board, include in the assessment pursuant to clause (i) any federal, state, and local funding opportunities, including general obligation bonds and funding opportunities from the private sector, that can help build port infrastructure for offshore wind energy development.
(iv)The assessment described in clause (i) shall be in addition to, and shall not be a substitute for, other assessments that may be required for ports to determine specific local needs for accessing funds for offshore wind energy development.
(b)(2)The estimated cost of providing the infrastructure identified in subdivision (a). paragraph (1).
(c)(3)A proposal for funding the infrastructure identified in subdivision (a), paragraph (1) that includes all of the following:
(1)(A)Criteria and priorities used to identify and select the infrastructure it does propose proposes to fund, including criteria used to identify and select infrastructure that by January 1, 2005, shall be consistent with the state planning priorities specified pursuant to Section 65041.1 for infrastructure requested by state agencies pursuant to paragraph (1) of subdivision (a). subparagraph (A) of paragraph (1).
(2)(B)Sources of funding, including, but not limited to, General Fund, state special funds, federal funds, general obligation bonds, lease revenue lease-revenue bonds, and installment purchases.
(3)(C)An evaluation of the impact of the new state debt on the states existing overall debt position if the plan proposes the issuance of new state debt.
(4)(A)(D)(i)Recommended specific projects for funding or the recommended type and amount of infrastructure to be funded in order to meet programmatic objectives that shall be identified in the proposal.
(B)(ii)Any capital outlay or local assistance appropriations intended to fund infrastructure included in the Governors Budget shall derive from, and be encompassed by, the funding proposal contained in the plan.
SEC. 4.Section 13103 of the Government Code is amended to read:13103.By January 1, 2005, if a state agency requests infrastructure pursuant to subparagraph (A) of paragraph (1) of subdivision (a) (b) of Section 13102, that agency shall specify how that infrastructure is consistent with the state planning priorities specified pursuant to Section 65041.1. The Governor may also order any entity of state government to assist in preparation of the infrastructure plan.
SEC. 5.Section 65042 of the Government Code is amended to read:65042.Every officer, agency, department, or instrumentality of state government, including, but not limited to, all trustee agencies as defined in Section 21070 of the Public Resources Code, shall do all of the following:
(a)Cooperate in the preparation and maintenance of the State Environmental Goals and Policy Report.
(b)By January 1, 2005, ensure that their entitys functional plan is consistent with the state planning priorities specified pursuant to Section 65041.1 and annually demonstrate to the office, and to the Department of Finance when requesting infrastructure pursuant to subdivision (a) paragraph (1) of subdivision (b) of Section 13102, how the plans are consistent with those priorities.
(c)Comply with any request for advice, assistance, information information, or other material.
|
Date
|
Status
|
|---|---|
| Feb 2, 2026 | From committee: Filed with the Chief Clerk pursuant to Joint Rule 56. |
| Jan 31, 2026 | Died pursuant to Art. IV, Sec. 10(c) of the Constitution. |
| May 23, 2025 | In committee: Held under submission. |
| May 14, 2025 | In committee: Set, first hearing. Referred to suspense file. |
| Apr 24, 2025 | Re-referred to Com. on APPR. |
| Apr 23, 2025 | Read second time and amended. |
| Apr 22, 2025 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 14. Noes 0.) (April 21). |
| Apr 22, 2025 | Coauthors revised. |
| Apr 8, 2025 | Re-referred to Com. on NAT. RES. |
| Apr 7, 2025 | Read second time and amended. |
| Apr 3, 2025 | From committee: Amend, and do pass as amended and re-refer to Com. on NAT. RES. with recommendation: To Consent Calendar. (Ayes 18. Noes 0.) (April 2). |
| Feb 24, 2025 | Referred to Coms. on U. & E. and NAT. RES. |
| Feb 7, 2025 | From printer. May be heard in committee March 9. |
| Feb 6, 2025 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Apr 21, 2025 | Do pass as amended, and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar | Assembly Standing Committee on Natural Resources |
Passed |
|
| Apr 2, 2025 | Do pass as amended, and be re-referred to the Committee on [Natural Resources] with recommendation: To Consent Calendar | Assembly Standing Committee on Utilities and Energy |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 350 Humboldt: Grass Roots Climate Action | ** Support | |
| American Clean Power California | ** Support | |
| California Association Of Port Authorities | ** Support | |
| California Environmental Voters | ** Support | |
| California State Association Of Electrical Workers | ** Support | |
| California Wind Energy Association | ** Support | |
| Clean Power Campaign | ** Support | |
| Climate Reality Project, Los Angeles Chapter | ** Support | |
| Climate Reality Project, Orange County | ** Support | |
| Climate Reality Project San Diego | ** Support | |
| Climate Reality Project: San Fernando Valley Chapter | ** Support | |
| Coalition of California Utility Employees | ** Support | |
| County of Humboldt | ** Support | |
| Environmental Defense Fund | ** Support | |
| Environment California | ** Support | |
| Epic - Environmental Protection Information Center | ** Support | |
| Friends Committee On Legislation Of California | ** Support | |
| Independent Energy Producers Association | ** Support | |
| Invenergy, LLC | ** Support | |
| Long Beach Port Of | ** Support | |
| Oceantic Network | ** Support | |
| Offshore Wind California | ** Support | |
| Pacific Merchant Shipping Association | ** Support | |
| Port of Long Beach | ** Support | |
| Sierra Club California | ** Support | |
| The Climate Center | ** Support |
Date of Hearing: May 14, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 472
Author:(Rogers) – As Amended Ver:April 23, 2025
Policy Committee: | Utilities and Energy | Vote: | 18 - 0 |
Natural Resources | 14 - 0 | ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill directs the California Energy Commission (CEC) to regularly assess the funding needs for port infrastructure needed to support offshore wind energy development.
Specifically, this bill requires the CEC, as part of each edition of the statutorily required integrated energy policy report (IEPR), starting with the 2027 edition, to include an assessment of funding needs for port infrastructure for offshore wind energy development consistent with the recommendations in the “Assembly Bill 525 Offshore Wind Strategic Plan.” The bill directs the CEC, in conducting the assessments, to consult with various other state agencies. Finally, the bill states the requirement on CEC to conduct the assessments is contingent upon an appropriation by the Legislature.
FISCAL EFFECT:
This bill requires significant new and ongoing analytical work of the CEC. The CEC estimates needing one new position at an annual cost of $225,000, ongoing, to support the analysis and consultation efforts associated with this assessment. The appropriate funding source is the Energy Resource Program Account (ERPA), which, CEC cautions, faces an ongoing structural deficit.
COMMENTS:
Electricity generated through the use of offshore wind is likely to be a key component of California’s future energy resource mix. In 2021, several state energy and environmental protection agencies produced the first “SB 100 Report,” which models pathways that could achieve the goal of meeting 100% of the state’s retail electricity sales and state agency electricity use be supplied by renewable and zero-carbon energy resources. The report called for substantial quantities of electricity generated by offshore wind facilities located in three areas of California coastal waters. There is almost no offshore wind developed in California today.
Statute directs the CEC to produce every two years an IEPR that contains an overview of major energy trends and issues facing the state and presents policy recommendations based on an in-depth and integrated analysis of the most current and pressing energy issues facing the state. A key component of each edition of the IEPR is a forecast of energy demand and an assessment and forecast of system reliability and the need for resource additions, efficiency and conservation, which is a key input to the procurement orders issued by the California Public Utilities Commission (CPUC) and the transmission planning process as the California Independent System Operator (CAISO).
The author contends CEC should include in the 2027 edition of the IEPR, and each edition thereafter, an assessment of funding needs for port infrastructure for offshore wind energy development. According to the author:
Offshore wind has the potential to transform the economy of the North and Central Coasts and create access to a new renewable energy source. Responsible, integrated planning for offshore wind energy facilities is key to their success. AB 472 will ensure offshore wind ports are included in California’s annual infrastructure planning so we can meet our state’s clean energy goals and create good paying jobs in local communities.
While the CEC did not explicitly recommend the bill require the CEC conduct the assessment less frequently, it did opine that conducting it every two years may be too frequent for significant changes to manifest, and that this proposed assessment may might be better suited to a standalone report, outside of the IEPR.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: April 21, 2025
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Isaac G. Bryan, Chair
ABPCA Bill Id:AB 472 (
Author:Rogers) – As Amended Ver:April 7, 2025
SUBJECT: Energy: offshore wind generation
SUMMARY: Requires an assessment of funding needs for port infrastructure for offshore wind energy (OWE) to be included in the Governor’s five-year infrastructure plan.
EXISTING LAW:
- Defines “infrastructure” as real property, including land and improvements to the land, structures and equipment integral to the operation of structures, easements, rights-of-way and other forms of interest in property, roadways, and water conveyances. (Government Code (GC) 13101)
- Requires the Governor, in conjunction with the Governor’s Budget, to annually submit a proposed five-year infrastructure plan to the Legislature. Requires the infrastructure plan to contain information for the five years it covers, including identification of new, rehabilitated, modernized, improved, or renovated infrastructure requested by state agencies; aggregate funding for transportation as identified in the four-year State Transportation Improvement Program Fund Estimate; infrastructure needs for Kindergarten through grade 12 public schools necessary to accommodate increased enrollment, class size reduction, and school modernization; the instructional and instructional support facilities needs for the University of California, the California State University, and the California Community Colleges; and construction, operation, and maintenance for facilities of the State Plan of Flood Control, support for infrastructure, support for specified infrastructure needs, and aggregate funding for the state share of nonfederal capital costs for flood control projects located outside of the Central Valley. (GC 13102)
- Requires the State Energy Resources Conservation and Development Commission (CEC) to develop a strategic plan for OWE developments installed off the California coast in federal waters. (Public Resources Code (PRC) 25991)
- Requires the CEC, pursuant to the Voluntary Offshore Wind Program, in coordination with relevant state and local agencies, to develop a plan to improve waterfront facilities that could support a range of floating OWE development activities. (PRC 25991.3)
- Requires the CEC to establish and administer a program to support offshore wind infrastructure improvements in order to advance the capabilities of California ports, harbors, and other waterfront facilities to support the buildout of offshore wind facilities and maximize the economic and environmental benefits of an offshore wind industry in California. Provides that eligible applicants include California port authorities, port operators, port commissions, and their respective authorized agents, other California waterfront facilities, and other entities that demonstrate a commitment to OWE investments and are partnered with a California waterfront facility. (PRC 25666)
- Establishes the Voluntary Offshore Wind and Coastal Resources Protection Fund to be continuously appropriated without regard to fiscal year to the CEC for OWE advancement. (PRC 25992.20)
- Authorizes $475 million to the CEC to support activities related to the development of OWE generation, including construction of publicly owned port facilities for manufacturing, assembly, staging, and integration of entitlements and components for offshore wind generation, and expansion and improvement of public port infrastructure to accommodate vessels involved in the installation, maintenance, and operation of offshore wind generation. (PRC 94540)
THIS BILL:
- Modifies the definition for “infrastructure” to additionally include port infrastructure for OWE development.
- Requires, beginning with the 2027–28 fiscal year, and contingent upon an appropriation by the Legislature, as part of the five-year infrastructure plan, an assessment of funding needs for port infrastructure for OWE development consistent with recommendations in the strategic plan for OWE developments installed off the California coast in federal waters and the seaport plan to improve waterfront facilities that could support a range of floating OWE development.
- For purposes of the assessment, port infrastructure subject to the assessment includes construction and staging of foundations, manufacturing of components, final assembly, and long-term operations and maintenance facilities associated with OWE development.
- Requires the Governor, in consultation with the Department of Finance, the Office of Land Use and Climate Innovation, the Governor’s Office of Business and Economic Development, the CEC, and the California Workforce Development Board, to include in the assessment any federal, state, and local funding opportunities, including general obligation bonds and funding opportunities from the private sector, that can help build port infrastructure for OWE development.
- Requires the assessment to be in addition to, and shall not be a substitute for, other assessments that may be required for ports to determine specific local needs for accessing funds for OWE development.
- Makes technical, non-substantive changes.
FISCAL EFFECT: Unknown
COMMENTS:
- Author’s statement:
Offshore wind has the potential to transform the economy of the North and Central Coasts and create access to a new renewable energy source. Responsible, integrated planning for offshore wind energy facilities is key to their success. AB 472 will ensure offshore wind ports are included in California’s annual infrastructure planning so we can meet our state’s clean energy goals and create good paying jobs in local communities.
- Offshore wind. The 100 Percent Clean Energy Act of 2018 [SB 100 (De León), Chapter 321, Statutes of 2018] increased California’s renewable portfolio standard (RPS) goal to 60% by 2030 and requires RPS-eligible resources and zero-carbon resources to supply 100% of California’s electricity retail sales and electricity procured to serve state agencies by 2045.
Based on a joint analysis by the CEC, the Public Utilities Commission, and the California Air Resources Board, an estimated six gigawatts of renewable energy and storage resources need to come online annually to meet the state’s 2045 carbon neutrality goal. Offshore wind is part of the state’s plan to meet those goals.
AB 525 (Chiu), Chapter 231, Statutes of 2021, requires the CEC to evaluate and quantify the maximum feasible offshore wind capacity to achieve reliability, ratepayer, employment, and decarbonization benefits and to establish OWE planning goals for 2030 and 2045. The range in the planning goals for 2030 reflects an understanding that achieving a 2030 online date for any proposed offshore wind project will take a significant mobilization of resources as well as timely infrastructure investments, while the planning goal for 2045 reflects anticipated technological developments and related cost reductions.
The July 2024 strategic plan pursuant to AB 525 lays out the path forward for achieving offshore wind goals. The three call areas for offshore wind in federal waters off the coast of California are the Humboldt area on the North Coast and the Morro Bay and Diablo Canyon areas off the Central Coast.
In addition, AB 3 (Zbur), Chapter 314, Statutes of 2023, requires the CEC to develop a 2nd-phase plan and strategy for seaport readiness that builds upon the recommendations and alternatives in the strategic plan for OWE developments and submit a report to the Legislature by December 31, 2026.
- Known funding needs. The offshore wind industry in California will require specialized port and waterfront facilities to build, assemble, and service the wind turbines needed to meet the offshore wind planning goals. Current ports will need significant upgrades to meet these specifications. For example, a project to build a 400-acre offshore wind turbine assembly terminal at California’s Port of Long Beach is expected to cost $4.7 billion, according to the Port of Long Beach’s May 2023 concept report.
For staging and integration improvements, the AB 525 strategic plan[1] estimates the following costs for the ports near the federal Bureau of Ocean Energy Management (BOEM) offshore wind leases:
- Current state investment in OWE. The CEC established the Offshore Wind Waterfront Facility Improvement Grant Program to implement the provisions of AB 209 (Committee on Budget), Chapter 251, Statutes of 2022, to support OWE infrastructure improvements, and the 2022–23 state budget included $45 million for the program to provide incentives to support offshore wind infrastructure improvements. The CEC is required to encumber the funds by June 30, 2025, and to make them available for liquidation until June 30, 2029. In March 2022, the CEC approved a $10.5 million grant for renovations at the Port of Humboldt Bay to support offshore wind activities in an area designated for development on the north coast.
The Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024 (Proposition 4) authorizes $10 billion in general obligation bonds, including nearly half a billion dollars to the CEC for the development of OWE generation, including construction of publicly owned port facilities and expansion and improvement of public port infrastructure. These funds have not yet been appropriated by the Legislature.
The federal Consolidated Appropriations Act of 2021 made $230 million available from the United States Department of Transportation’s Port Infrastructure Development Program, with $205 million reserved for grants to coastal seaports and Great Lakes ports. The federal Inflation Reduction Act of 2022 included more than a billion dollars of tax incentives for investments in offshore wind production and manufacturing (including $426 million to Humboldt for construction of the onshore facilities to support the building and operation of offshore wind turbines off the Humboldt County Coast).
The current Trump Administration makes funding uncomfortably uncertain. In January, President Trump announced a withdrawal of wind energy leasing in all areas within the Offshore Continental Shelf. While that is not expected to impact the areas already leased by BOEM, it leaves some with uncertainty about future funding, which the state will need to support the high price tag for port infrastructure investment.
- This bill. AB 472 requires the governor, in the 5-year infrastructure assessment, to conduct an assessment of funding needs for port infrastructure for OWE development consistent with recommendations in the AB 525 strategic plan.
As described above, the AB 525 plan has already assessed the infrastructure costs of the ports, in addition to alternative or ancillary location. Until the ports are ready to break ground, true costs will remain somewhat unknown due to inflation, economic impacts of federal tariffs on countries from which the state may be importing building materials, local resource needs for the workforce building out the ports (such as accommodations, restaurants, etc.).
- 5-year infrastructure plan. The California Infrastructure Planning Act requires the Governor to submit a Five-Year Infrastructure Plan to the Legislature in conjunction with the Governor’s Budget. The Plan identifies infrastructure needs statewide and sets out priorities for funding. The Plan also evaluates these infrastructure needs in the overall context of available funding sources, what the state could afford, and how the state could grow in the most sustainable way possible.
The Plan is strictly limited to state infrastructure; it does not include local agency or private infrastructure, etc. Since ports are local agencies, including a cost assessment for port development doesn’t fit neatly into the Plan.
Alternatively, the Committee may wish to consider requiring an addendum to the CEC’s integrated energy policy report (IEPR), which is a biennial report that provides a cohesive approach to identifying and solving the state’s energy needs and issues. The report develops and implements energy plans and policies. Riding the coat tails of IEPR will build onto the CEC’s work on AB 525 and AB 3 to streamline the assessment requested by this bill.
- Double referral. This bill was heard in the Assembly Utilities and Energy Committee on April 2 and approved 18-0.
- Committee amendments. The committee may wish to amend the bill to move the operative content of the bill to a new code adjacent to the IEPR authorizing statute as follows:
PRC 25302.1 (a) (1) As part of the 2027 edition of the integrated energy policy report, and each edition thereafter, and contingent upon an appropriation by the Legislature for purposes of this subparagraph, the Commission shall include in its next biennial integrated energy policy report an assessment of funding needs for port infrastructure for offshore wind energy development consistent with recommendations in the strategic plan for offshore wind energy developments installed off the California coast in federal waters developed pursuant to Section 25991 of the Public Resources Code and the seaport plan to improve waterfront facilities that could support a range of floating offshore wind energy development activities pursuant to Section 25991.3 of the Public Resources Code.
(2) For purposes of the assessment described in paragraph (1), both of the following shall apply:
(A) Port infrastructure subject to the assessment includes construction and staging of foundations, manufacturing of components, final assembly, and long-term operations and maintenance facilities associated with offshore wind energy development.
(2) The assessment shall be in addition to, and shall not be a substitute for, other assessments that may be required for ports to determine specific local needs for accessing funds for offshore wind energy development.
(b) The Commission shall, in consultation with the Department of Finance, the Office of Land Use and Climate Innovation, the Governor’s Office of Business and Economic Development, the State Energy Resources Conservation and Development Commission, the State Lands Commission, and the California Workforce Development Board, include in the assessment pursuant to clause (i) any federal, state, and local funding opportunities, including general obligation bonds and funding opportunities from the private sector, that can help build port infrastructure for offshore wind energy development.
REGISTERED SUPPORT / OPPOSITION:
Support
350 Humboldt: Grass Roots Climate Action
American Clean Power- California
California Association of Port Authorities
California Environmental Voters
California State Association of Electrical Workers
California Wind Energy Association
Clean Power Campaign
Climate Reality Project San Diego
Climate Reality Project San Fernando Valley Chapter
Climate Reality Project, Los Angeles Chapter
Climate Reality Project, Orange County
Coalition of California Utility Employees
County of Humboldt
Environment California
Environmental Defense Fund
Epic - Environmental Protection Information Center
Friends Committee on Legislation of California
Independent Energy Producers Association
Invenergy, LLC
Long Beach; Port of
Oceantic Network
Offshore Wind California
Pacific Merchant Shipping Association
Port of Long Beach
Sierra Club California
The Climate Center
Opposition
None on file
Analysis Prepared by: Paige Brokaw / NAT. RES. /
Date of Hearing: April 2, 2025
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
ABPCA Bill Id:AB 472 (
Author:Rogers) – As Introduced Ver:February 6, 2025
SUBJECT: Energy: offshore wind generation
SUMMARY: Amends the definition of “infrastructure” for purposes of the Governor’s annual infrastructure plan to include port infrastructure for offshore wind energy development.
Specifically, this bill:
- Amends the definition of “infrastructure” for purposes of the Governor’s annual infrastructure plan to include port infrastructure for offshore wind energy development.
- Requires the annual California infrastructure plan to include an assessment of funding needs for port infrastructure for offshore wind energy development, beginning with the 2027-28 fiscal year.
- Requires the Governor, in consultation with specified entities, to assess federal, state, and local funding opportunities, including general obligation bonds and funding from the private sector, that can help build port infrastructure for offshore wind energy development.
EXISTING LAW:
- Establishes the policy that all of the state's retail electricity be supplied with a mix of Renewables Portfolio Standard (RPS)-eligible and zero-carbon resources by December 31, 2045, for a total of 100%clean energy. Requires the California Public Utilities Commission (CPUC), in consultation with the California Energy Commission (CEC), California Air Resources Board (CARB), and all California balancing authorities, to issue a joint report to the Legislature by January 1, 2021, reviewing and evaluating the 100%clean energy policy, and every four years thereafter. (Public Utilities Code § 454.53)
- Requires the CEC in coordination with specified agencies, to develop a strategic plan for OSW energy developments installed off the California coast in federal waters, and requires the CEC to submit the strategic plan to the Natural Resources Agency and the Legislature on or before June 30, 2023, as specified. (Public Resources Code § 25991 et seq.)
- Requires the CEC, in coordination with relevant state and local agencies, to develop a plan to improve waterfront facilities that could support a range of floating OSW energy development activities, as specified. (Public Resources Code § 25991.3)
- Defines “infrastructure" real property, including land and improvements to the land, structures, and equipment integral to the operation of structures, easements, rights-of-way, and other forms of interest in property, roadways, and water conveyances. (Government Code § 13101)
- Establishes the Voluntary Offshore Wind and Coastal Resources Protection Program to fund assessments, studies of impacts, comprehensive environmental impacts monitoring, adaptive management, and to fulfill infrastructure readiness commitments, among other activities, with the overall goal of avoiding and minimizing impacts to coastal resources from floating offshore wind. (Public Resources Code § 25992)
- Requires the Governor to annually submit a five-year infrastructure plan to the Legislature in conjunction with the Governor’s Budget. The plan is intended to complement the existing state budget process by providing a comprehensive guideline for the types of projects to be funded through that process. (Government Code § 13102)
- Requires the infrastructure plan to contain, among other things, information on support for infrastructure needs and an evaluation of the impact of the new state debt on the state’s existing overall debt position if the plan proposes the issuance of new state debt. (Government Code § 13102 (c) (2))
- Allocates, upon appropriation by the Legislature, $475 million for activities related to the development of offshore wind, including port infrastructure improvements and upgrades. (Public Resources Code § 94540)
FISCAL EFFECT: Unknown. This bill is keyed fiscal and will be referred to the Committee on Appropriations for its review.
CUSTOMER COST IMPACTS: This measure seeks to incorporate offshore wind port infrastructure into California's Five-Year Infrastructure Plan, and requires an assessment of funding needs for such infrastructure. While the legislation does not directly impact ratepayers, the use of public funds to implement this bill may result in costs to taxpayers, depending on the funding mechanisms employed.
BACKGROUND:
California’s Transition to 100% Clean Electricity. SB 100 (De León, Chapter 312, Statutes of 2018) established the state policy that renewable and zero-carbon resources should supply 100% of retail sales and electricity procured in the state by 2045.[1] This policy was updated under SB 1020 (Laird, Chapter 361, Statutes of 2022) which accelerated the requirement on state agencies to 100% by 2035, and established interim targets to meet the economy-wide 100% goal. California has made progress in decarbonizing its energy sector, with recent data showing that zero-carbon and renewable resources supplied roughly 61% of the state’s electricity in 2022.[2] Solar energy has been the dominant source of California’s renewable energy resources, accounting for nearly 20%,[3] of the state’s electricity supply. This growth is largely attributed by the cheaper prices of solar photovoltaics in recent years and California’s abundant solar capacity. However, as solar generation increases in California, the mismatch between when it is generated and when it is needed poses challenges for grid stability and operation. According to the CEC, OSW has the potential to produce electricity during periods when solar production declines. As such, OSW could complement solar and onshore wind resources thus improving grid reliability.
In March 2021, the CEC, California Public Utilities Commission (CPUC), and California Air Resources Board (CARB) released the first SB 100 report, and offshore wind energy was modelled to 10 gigawatts (GW) over four resource zones: Morro Bay, Diablo Canyon, Humboldt Bay, and Cape Mendocino. The model was given an input assumption of 2030 as the first available year for bringing offshore wind energy online given the current California Independent System Operator (CAISO) interconnection queue and resource development needs of OSW.[4] The report notes “The preliminary findings [in the report] are intended to inform state planning and are not intended as a comprehensive nor prescriptive roadmap to 2045… future work will delve deeper into critical topics such as system reliability and land use and further address energy equity and workforce needs.”[5] The subsequent report will be released in 2025, and one every four years later.
Offshore Wind California. Worldwide, OSW is developing into a dynamic and growing industry sector in renewable energy. By the end of 2023, the total global OSW capacity totaled to 75.2 GW.[6] The U.S. lags behind with a total online capacity of only 42 MW today[7], less than 1% of the global total. There is currently 56 GW of capacity under development – primarily on the East Coast – with approximately 14 GW of that expected to be online by 2035.[8] Off the coast of California where winds can exceed 7 meters per second, the National Renewable Energy Laboratory (NREL) has identified 200 GW of offshore wind potential.[9][10] This potential, however, is complicated by the fact that approximately 96% of it is located in water deeper than 60 meters, where the mature, fixed-bottom turbine technology that is used in most OSW projects globally and domestically is not technically feasible.[11] Instead, these OSW projects will need to rely on floating technology, wherein the towers are anchored to the seafloor via long mooring buoys and cables then connected to the grid through floating substations and subsea electric cables.
AB 525 Strategic Plan. In 2021, the Legislature passed AB 525 (Chiu, Chapter 231, Statutes of 2021), which the CEC in coordination with federal, state, and local agencies, California Native American tribes, and a variety of stakeholders, to develop a strategic plan for offshore wind energy development in federal waters off the California coast. In August 2022, the CEC approved a planning goal of 2–5GW by 2030, and eventually 25GW by 2045.[12] In July 2024, as per the requirements of AB 525, the CEC adopted a comprehensive strategic plan to guide the development of OSW and reach the 2045 planning goal.[13] This includes an assessment of the investments necessary at California’s ports to enable the development of offshore wind energy.
California OSW Leases. In December 2022, The Bureau of Ocean Energy Management (BOEM)[14] held the first federal offshore wind (OSW) lease auction in the Pacific, awarding five lease areas off California’s coast. These areas, located approximately 20 miles offshore, include three near Morro Bay on the Central Coast—leased by Equinor Wind, Golden State Wind, and Invenergy—and two off Humboldt County in Northern California, leased by Vineyard Offshore and RWE. All five projects will feature large-scale floating offshore wind farms, a first of their kind. Together, they have a combined nameplate capacity of 4.6 GW, marking a significant step in California’s offshore wind development.
California OSW Ports. The successful development of OSW will require upgrades to ports and waterfront facilities to support multiple operations, including construction and staging of floating platform foundations, manufacturing and storage of components, and final assembly. The CEC and BOEM have determined that no single port can meet all of the port infrastructure needs for the OSW industry in California.[15] Instead, the state must strategically develop a port network that can efficiently, cost-effectively, and reliably support staging and integration (S&I), manufacturing/fabrication (M/F), and operation and maintenance (O&M) activities along the California Coast.[16] Different factors affect the candidacy of each port for each activity. S&I sites require a large amount of space, deep navigation channels, and cannot have any air draft restrictions (e.g. bridges) since the fully assembled turbine systems, which rise 1,100 feet above water, need to be towed out to the installation site. Therefore, the ports of Humboldt, Los Angeles, and Long Beach are most suitable as S&I sites. M/F sites can occupy less space than S&I sites and be at locations with air draft restrictions since the individual components can be transported horizontally via vessel or barge. Ideally, O&M sites that transfer crew to and from the OSW farms should be close to the wind farm location to minimize travel crew time.
The Port of Humboldt Bay has already drawn up plans, begun mobilizing funding, and started the environmental review process for required upgrades to serve the OSW industry. The Port of Long Beach has also begun preparing for a proposed $4.7 billion development plan that would create a facility to support the manufacturing and assembly of OSW turbines.[17]The CEC estimates that the total upgrades needed across all of the identified ports will cost approximately $(11 to 12 billion) to meet the 2045 goal for 25 GW of OSW in California.[18] However, a coordinated port development strategy—along with programs that support early-stage port upgrades—is needed to support offshore wind deployment.
Port-adjacent Communities. Industrial activity and development at ports can result in significant environmental burdens for communities living near ports, including air, water, noise, and light pollution. Nearly 2 million pounds of toxic air contaminants pollute the skies in or near the Ports of Los Angeles and Long Beach, which contributes to high childhood asthma rates in those communities.[19] Although port and truck electrification have promise to achieve local emissions reductions, many emissions from port activities also come from the marine vessel traffic moving goods in and out, which may be increased as a result of OSW activity. The investment into port upgrades, however, could support an average of about 6,700 skilled workers annually over 10 years across the myriad of potential port sites.[20]
California Offshore Wind Advancement Act. AB 3 (Zbur, Chapter 314, Statutes of 2023) establishes the California Offshore Wind Advancement Act, and requires the CEC, in consultation with the State Lands Commission, and other specified state entities to develop a strategy for seaport readiness for offshore wind energy developments, including the feasibility of achieving 50% and 65% in-state assembly and manufacturing of offshore wind energy projects, as provided. This bill builds upon the efforts of AB 525 report, and requires the CEC to provide a final report on its findings to the Governor and the Legislature on or before December 31, 2027.
California Infrastructure Planning Act. AB 1473 (Hertzberg, Chapter 606, Statutes of 1999) established the California Infrastructure Planning Act which requires the Governor to annually submit a statewide five-year infrastructure plan to the Legislature, along with the state budget.[21] The plan identifies priority infrastructure needs across all state agencies and proposes funding strategies over a five-year horizon, ensuring that investments are strategically aligned with California's long-term policy objectives and state funding capacity. This structured approach supports transparency, efficiency, and accountability in allocating resources for needed infrastructure projects across various sectors, such as transportation, education, water resources, and public safety.
2022 Five-Year Infrastructure Plan. The plan submitted as part of the 2022-2023 budget witnessed historic investments. California was expected to receive about $14 billion of additional funding from the federal Infrastructure Investment Act. The Administration also proposed investments for clean energy projects in the 2022-23 budget that would make the state more resilient to climate change. This included $45 million from the General Fund that was ultimately approved by the Legislature which allows the California Energy Commission (CEC) to fund activities that advance the development of offshore wind energy in federal waters off California. The CEC has yet to disburse this funding.
Climate Resiliency Bond. SB 867 (Allen, Chapter 83, Statutes of 2004), known as the Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024, authorized $10 billion in general obligation bonds to fund a variety of projects to increase the state's resilience to climate change while safeguarding its natural resources. Within this measure, $475 million is specifically allocated for port infrastructure upgrades to support offshore wind energy development.
COMMENTS:
- Author’s statement. According to the author, “Offshore wind has the potential to transform the economy of the North and Central Coasts and create access to a new renewable energy source. Responsible, integrated planning for offshore wind energy facilities is key to their success. AB 472 will ensure offshore wind ports are included in California’s annual infrastructure planning so we can meet our state’s clean energy goals and create good paying jobs in local communities.”
- January 2025 Temporary Memorandum. In January 2025, President Trump signed a temporary memorandum indefinitely suspending new or renewed OSW leases on the Outer Continental Shelf (OCS) and mandating a comprehensive assessment and review of federal wind leases and permitting practices. The order also directed all federal agencies to pause all “new or renewed approvals, rights of way, permits, leases, or loans for onshore or offshore wind projects [22] This policy shift marks a reversal from the previous Administration's efforts to expand the OSW industry. While the order does not immediately revoke existing leases, it subjects them to a review process that could lead to terminations therefore creating uncertainty around the future growth of the industry.
- Alternative Path. Substantial investments will be needed to transform California's ports into facilities capable of supporting the assembly, storage, and deployment of large-scale wind turbines. The strategic plan released by the CEC estimates that the total upgrades needed across all of the identified ports will cost approximately $11 to $12 billion to meet the 2045 goal for 25 GW of OSW in California. This legislation directs the five-year California infrastructure plan to include an assessment of funding needs for port infrastructure for offshore wind energy development— a directive that aligns with CEC’s efforts under the AB 525 strategic plan.
As mentioned above, the statewide five-year infrastructure plan identifies priority infrastructure needs across all state agencies and proposes funding strategies over a five-year horizon, ensuring that investments are strategically aligned with California's long-term policy objectives and state funding capacity. Therefore, including infrastructure assessments for a specific industry as this bill provides could introduce complexities into the state's infrastructure planning process and risk undermining the broader intent of the plan., the author may wish to leverage the expertise of the CEC and consider instead including the assessment into the integrated energy policy report (IEPR) which serves as a blueprint for state energy planning and infrastructure development.
- Existing Law. Section 1(d) of the intent language of the bill incorrectly states that SB 100 requires that eligible renewable energy resources and zero-carbon resources supply 60 percent of all retail sales of electricity to California end-use customers by December 31, 2030. As such, the committee recommends amending this section to state that SB 100 requires that eligible renewable resources supply 60 percent of all retail sales of electricity to California end-use customers by December 31, 2030, and eligible renewable and zero-carbon resources supply 100 percent of all retail sales of electricity to California end-use customers by December 31, 2045.
- Updated AB 525 Plan— As eluded earlier, the CEC was mandated to develop a strategic plan for OSW development in federal waters off the California Coast. As part of this initiative, the CEC released a Draft Strategic Plan on January 19, 2024, for public review and comment. On July 10, 2024, the CEC finalized the Strategic Plan, establishing the state's roadmap for offshore wind energy development, with target goals of 2-5 GW of OSW capacity by 2030 and 25 GW by 2045. As such, given the adoption of the final Strategic Plan, the author and committee recommend deleting references to the Draft Strategic Plan to reflect the most up-to-date adopted strategic plan set forth by the CEC.
- Prior Legislation.
AB 3006 (Zbur, 2024) would have amended the definition of “infrastructure” for purposes of the Governor’s annual infrastructure plan to include port infrastructure for offshore wind energy development. Died – Senate Committee on Appropriations.
AB 2537 (Addis, 2024) would establish the Offshore Wind Community Capacity Funding Grant Account to build capacity within local communities and tribal communities to support engagement of the process of OSW energy development in California and continuously appropriate funding from the existing Voluntary Offshore Wind and Coastal Resources Protection Fund at the CEC. Status: Vetoed by the Governor.
AB 3 (Zbur) requires the CEC to prepare a report that identifies potential alternatives, analyzes, and makes recommendations regarding procurement mechanisms and procurement strategies for offshore wind energy projects to be financed, entitled, constructed, and operated within the timeframes necessary for meeting the state’s carbon neutrality goals. Status: Chapter 314, Statutes of 2023.
AB 80 (Addis, 2023), would have required the Ocean Protection Council, upon an appropriation by the Legislature, to establish and oversee a West Coast Offshore Wind Science Entity to ensure that comprehensive baseline assessments and ongoing monitoring data related to the California ocean ecosystem are available to inform state and federal decision-making. Status: Held in the Senate Committee on Appropriations.
SB 704 (Min, Chapter 292, Statutes of 2023) authorizes the California Coastal Commission to seek scientific advice on offshore wind, among other things.
AB 1373 (Garcia, Chapter 367, Statutes of 2023) authorizes the DWR to act as a centralized procurement entity until January 1, 2035, to procure eligible energy resources, including OSW, in order to help the state meet its renewable and zero-carbon energy resources and reliability goals should the CPUC identify a specific procurement need and make a request of DWR. Also committed a future $6 million appropriation in the 2024-25 fiscal year to support environmental monitoring and research into OSW impacts around the regions the federal government has leased areas for wind development, among other things.
SB 286 (McGuire, Chapter 386, Statutes of 2023) establishes the California Offshore Wind Energy Fisheries Working Group to address OSW project impacts on certain fisheries and related interests, including the development of a statewide strategy to minimize impacts to ocean fisheries and providing for reasonable compensation to those affected. Additionally, required the CCC to process a consolidated coastal development permit for new development associated with OSW projects and related transmission facilities in the coastal zone, and required the CSLC to be the lead agency for purposes of environmental review for OSW projects, among other provisions.
AB 209 (Committee on Budget, Chapter 251, Statutes of 2022) requires the CEC to establish and administer a program to support OSW infrastructure improvements to advance the capabilities of California’s ports, harbors, and other waterfront facilities to support the buildout of OSW facilities. Also established the Voluntary Offshore Wind and Coastal Resources Program at the CEC to support state activities that complement or support federal laws related to the development of OSW facilities, among other provisions.
SB 1020 (Laird) establishes interim targets for the statewide 100% clean energy policy. Additionally requires state agencies to accelerate their 100% clean energy policy goal by 10 years. Status: Chapter 361, Statutes of 2022.
SB 1253 (Melendez) requires the infrastructure plan to set out infrastructure priorities relating to specified flood prevention and maintenance. Status: Chapter 195, Statutes of 2022.
AB 525 (Chiu) requires the CEC to establish 2030 and 2045 planning goals, as specified, for electricity generated by offshore wind. Additionally requires the CEC, in coordination with specified agencies, to develop a five-part strategic plan for offshore wind development and to submit the plan to the Natural Resources Agency the Legislature by June 30, 2023. Status: Chapter 231, Statutes of 2021
SB 100 (De León) establishes the 100% Clean Energy Act of 2017 which increases the Renewables Portfolio Standards (RPS) requirement from 50% by 2030 to 60% and creates the policy of planning to meet all of the state's retail electricity supply with a mix of RPS-eligible and zero-carbon resources by December 31, 2045, for a total of 100% clean energy. Status: Chapter 312, Statutes of 2018.
- Double Referral. This bill is double-referred; upon passage in this Committee, this bill will be referred to the Assembly Committee on Natural Resources.
REGISTERED SUPPORT / OPPOSITION:
Support
350 Humboldt: Grass Roots Climate Action
American Clean Power- California
California Association of Port Authorities
California Environmental Voters (formerly Clcv)
California State Association of Electrical Workers
California Wind Energy Association
Clean Power Campaign
Climate Reality Project San Diego
Climate Reality Project San Fernando Valley Chapter
Climate Reality Project, Los Angeles Chapter
Climate Reality Project, Orange County
Coalition of California Utility Employees
County of Humboldt
Environment California
Environmental Defense Fund
Epic - Environmental Protection Information Center
Friends Committee on Legislation of California
Independent Energy Producers Association
Invenergy, LLC
Long Beach; Port of
Oceantic Network
Offshore Wind California
Pacific Merchant Shipping Association
Port of Long Beach
Sierra Club California
The Climate Center
Opposition
None on file.
Analysis Prepared by: Lina V. Malova / U. & E. / (916) 319-2083
Public Utilities Code §454.53 ↑
61% = 39.4% from renewables (solar, wind, geothermal, biomass, small hydro) + 10.8% from large hydro + 10.7% from nuclear. CEC; “Clean Energy Serving California”; https://www.energy.ca.gov/programs-and-topics/topics/renewableenergy/clean-energy-serving-california ↑
61% = 39.4% from renewables (solar, wind, geothermal, biomass, small hydro) + 10.8% from large hydro + 10.7% from nuclear. CEC; “Clean Energy Serving California”; https://www.energy.ca.gov/programs-and-topics/topics/renewableenergy/clean-energy-serving-California ↑
Pg. 41; Inputs & Assumptions: CEC SB 100 Joint Agency Report; June 2020. ↑
Pg. 1, CEC, CPUC, & CARB; 2021 SB 100 Joint Agency Report: Achieving 100 Percent Clean Electricity in California: An Initial Assessment;” March 2021. ↑
Global Wind Energy Council; Global Offshore Wind Report 2024; June 2024. ↑
Tham, N.; “The latest headwinds and tailwinds for U.S. offshore wind”; March 2024; https://bipartisanpolicy.org/blog/thelatest- headwinds-and-tailwinds-for-u-s-offshore-wind/ ↑
American Clean Power; “New report: Offshore wind momentum grows with sector to invest $65 billion and create 56,000 U.S. jobs by 2030”; July 2024; https://cleanpower.org/news/offshore-wind-to-invest-65-billion-and-create-56000jobs-by- 2030/ ↑
“Technical potential” is defined as the amount of offshore wind capacity that could be developed while taking into account exclusion factors related to water depth, mean wind speed, industry uses, and environmental conflicts (Musial et al. 2016a).
It does not include areas where the wind speeds are lower than 7 meters per second or deeper than 1,300 meters. ↑
NREL; 2020 Offshore Wind Resource Assessment for the California Pacific Outer Continental Shelf; October 2020. ↑
Pg. 7, CEC; Research and Development Opportunities for Offshore Wind Energy in California; August 2020. ↑
CEC; “Offshore Wind Energy Development off the California Coast Maximum Feasible Capacity and Megawatt Planning Goals for 2030 and 2045”; August 2020. ↑
CEC; “AB 525 Reports: Offshore Renewable Energy”; https://www.energy.ca.gov/data-reports/reports/ab-525-reportsoffshore-renewable-energy; July10, 2024 ↑
The Bureau of Ocean Energy Management (BOEM) is a U.S. federal agency under the Department of the Interior responsible for managing the development of energy and mineral resources on the Outer Continental Shelf (OCS). BOEM oversees offshore wind, oil, gas, and marine mineral leasing while ensuring environmental protection and sustainable resource use. ↑
Chap. 1, BOEM; California Floating Offshore Wind Regional Ports Assessment; January 2023. ↑
Fig. 6-5, CEC; Commission Adopted Final Report AB 525 Strategic Plan Volume II; July 2024. ↑
Port of Long Beach; “Pier Wind Project Concept Phase: Final Conceptual Report”; April 2023. ↑
Pg. 25, CEC; Commission Adopted Final Report AB 525 Strategic Plan Volume I; July 2024 ↑
CalMatters; “In the shadows of industry: LA County’s port communities”; February 2022; https://calmatters.org/environment/2022/02/environmental-justice-photo-essay-la-county-port-communities/ ↑
Pg. 169, CEC; Commission Adopted Final Report AB 525 Strategic Plan Volume II; July 2024. ↑
AB 1473 (Hertzberg, Chapter 606, Statutes of 1999) ↑
The White House, “Temporary Withdrawal of All Areas on the Outer Continental Shelf from Offshore Wind Leasing and Review of the Federal Government’s Leasing and Permitting Practices for Wind Projects.” Accessed March 16, 2025 ↑
Bill Author