AB 527: California Environmental Quality Act: geothermal exploratory projects: geothermal field development projects: enhanced geothermal system wells.
- Session Year: 2025-2026
- House: Assembly
- Latest Version Date: 2025-09-12
Current Status:
Failed
(2026-01-22: Consideration of Governor's veto stricken from file.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if the lead agency finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law establishes the Geologic Energy Management Division in the Department of Conservation, under the direction of the State Oil and Gas Supervisor, who is required to supervise the drilling, operation, maintenance, and abandonment of wells so as to permit the owners or operators of those wells to use all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources, as provided. Existing law requires the division to be the lead agency for all geothermal exploratory projects for purposes of CEQA, as specified, and authorizes the division to delegate its lead agency responsibility for geothermal exploratory projects to a county that has adopted a geothermal element for its general plan. Existing law also requires the county in which a geothermal project is located to assume the responsibilities of a lead agency for a geothermal exploratory project upon the request of an applicant, as specified. Existing law defines geothermal exploratory project in part as a project composed of not more than 6 wells and associated drilling and testing equipment whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources. Existing law requires wells included within a geothermal exploratory project to be located at least one-half mile from geothermal development wells that are capable of producing geothermal resources in commercial quantities. Existing law requires the owner or operator of a well to keep, or to cause to be kept, a careful and accurate log, core record, and history of drilling the well and requires the log to show, among other things, the character and depth of the formation passed through or encountered in the drilling of the well. Upon completion or abandonment of a well, or upon the suspension of operations of a well, existing law requires true copies of the log, core record, and history to be filed with the district deputy of an oil and gas district, as specified.
This bill would expressly include as part of a geothermal exploratory project, among other things, equipment and activities necessary to establish interconnectivity between wells and reservoirs. The bill would exclude certain wells connecting to geothermal reservoirs from the one-half mile limit described above. The bill would require the log for a well that is part of a geothermal exploratory project that is exempt from CEQA, as described below, to include the chemical and physical characteristics of well stimulation fluids. Upon completion or abandonment of a well, or upon the suspension of operations of a well, that is part of a geothermal exploratory project that is exempt from CEQA, as described below, the bill would require a project developer to disclose the composition of fluids used in all relevant hydraulic fracturing operations with the log for a well and would require the project developer to file a copy of the disclosure with the lead agency.
This bill would, until January 1, 2031, exempt from CEQA geothermal exploratory projects that meet specified conditions and for which the county or the Geologic Energy Management Division is the lead agency. The bill would require a project developer to conduct a reconnaissance survey, that includes certain information, and to supply the lead agency with the reconnaissance survey when applying for an exemption from CEQA. The bill would require the lead agency to engage in a scoping consultation with any California Native American tribe that is traditionally and culturally affiliated with the geographic area of the proposed project, as provided. The bill would authorize the lead agency to require the project applicant to file an indemnity bond, as specified, before the lead agency determines that a geothermal exploratory project is exempt from CEQA. The bill would require a geothermal exploratory project that is exempt from CEQA to include full reclamation of the project site, as provided. The bill would require the lead agency, at least 30 days before making a determination to approve a geothermal exploratory project as exempt from CEQA pursuant to this exemption, to post a written notice of the intent to apply the exemption at the project site and to post a written notice of the intent to apply the exemption and the entire project application on its internet website. If the lead agency determines that the project is exempt from CEQA, the bill would require the lead agency to file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located, as provided, and to provide a copy of the notice to specified entities. Because the exemption would apply to projects where the county is the lead agency and the county would be required to engage in a scoping consultation and determine if a project qualifies for this exemption, the bill would impose a state-mandated local program.
This bill would require a geothermal field development project located on a site where a geothermal exploratory project was deployed pursuant to the above-described CEQA exemption to use a baseline for CEQA review that reflects the site before the geothermal exploratory project occurred.
Existing law requires the owner or operator of a well to file a written notice of intention to commence drilling with, and prohibits any drilling until approval is given by, the supervisor or district deputy.
This bill would require, on or before January 1, 2029, the Geologic Energy Management Division to promulgate regulations for enhanced geothermal system wells, as provided. Before the promulgation and implementation of those regulations, the bill would require an operator to provide specified information to the supervisor when the operator files the notice of intent to commence drilling for a well in a CEQA-exempt geothermal exploratory project that employs enhanced geothermal system technology.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if the lead agency finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law establishes the Geologic Energy Management Division in the Department of Conservation, under the direction of the State Oil and Gas Supervisor, who is required to supervise the drilling, operation, maintenance, and abandonment of wells so as to permit the owners or operators of those wells to utilize use all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources, as provided. Existing law requires the division to be the lead agency for all geothermal exploratory projects for purposes of CEQA, as specified, and authorizes the division to delegate its lead agency responsibility for geothermal exploratory projects to a county that has adopted a geothermal element for its general plan. Existing law also requires the county in which a geothermal project is located to assume the responsibilities of a lead agency for a geothermal exploratory project upon the request of an applicant, as specified. Existing law defines geothermal exploratory project in part as a project composed of not more than 6 wells and associated drilling and testing equipment whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources. Existing law requires wells included within a geothermal exploratory project to be located at least one-half mile from geothermal development wells that are capable of producing geothermal resources in commercial quantities. Existing law requires the owner or operator of a well to keep, or to cause to be kept, a careful and accurate log, core record, and history of drilling the well and requires the log to show, among other things, the character and depth of the formation passed through or encountered in the drilling of the well. Upon completion or abandonment of a well, or upon the suspension of operations of a well, existing law requires true copies of the log, core record, and history to be filed with the district deputy of an oil and gas district, as specified.
This bill would expressly include as part of a geothermal exploratory project, among other things, equipment and activities necessary to establish interconnectivity between wells and reservoirs. The bill would exclude certain wells connecting to geothermal reservoirs from the one-half mile limit described above. The The bill would require the log for a well that is part of a geothermal exploratory project that is exempt from CEQA, as described below, to include the chemical and physical characteristics of well stimulation fluids. Upon completion or abandonment of a well, or upon the suspension of operations of a well, that is part of a geothermal exploratory project that is exempt from CEQA, as described below, the bill would require a project developer to disclose the composition of fluids used in all relevant hydraulic fracturing operations with the log for a well and would require the project developer to file a copy of the disclosure with the lead agency.
This bill would, until January 1, 2031, exempt from CEQA geothermal exploratory projects that meet specified conditions and for which the county or the Geologic Energy Management Division is the lead agency. Before the lead agency determines that a geothermal exploratory project is exempt from CEQA, the The bill would require a project developer to conduct a reconnaissance survey, that includes certain information, and to supply the lead agency with a the reconnaissance survey that includes specified information. when applying for an exemption from CEQA. The bill would require the lead agency to engage in a scoping consultation with any California Native American tribe that is traditionally and culturally affiliated with the geographic area of the proposed project, as provided. The bill would authorize the lead agency to require the project applicant to file an indemnity bond, as specified, before the lead agency determines that a geothermal exploratory project is exempt from CEQA. The bill would require a geothermal exploratory project that is exempt from CEQA to include full reclamation of the project site, as provided. The bill would require the lead agency, at least 30 days before making a determination to approve or carry out a change in use a geothermal exploratory project as exempt from CEQA pursuant to this exemption, to post a written notice on its internet website and of the intent to apply the exemption at the project site. The bill would also require the lead agency to post the entire project application on its internet website. site and to post a written notice of the intent to apply the exemption and the entire project application on its internet website. If the lead agency determines that the project is exempt from CEQA, the bill would require the lead agency to file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located, as provided, and to provide a copy of the notice to specified entities. Because the exemption would apply to projects where the county is the lead agency and the county would be required to engage in a scoping consultation and determine if a project qualifies for this exemption, the bill would impose a state-mandated local program.
TheThis bill would require a geothermal field development project located on a site where a geothermal exploratory project was deployed pursuant to the above-described CEQA exemption to use a baseline for CEQA review that reflects the site before the geothermal exploratory project occurred.
Existing law requires the owner or operator of a well to file a written notice of intention to commence drilling with, and prohibits any drilling until approval is given by, the supervisor or district deputy.
This bill would require, on or before January 1, 2029, the Geologic Energy Management Division to promulgate regulations for enhanced geothermal system wells, as provided. Before the promulgation and implementation of those regulations, the bill would require an operator to provide specified information to the supervisor when the operator files the notice of intent to commence drilling for a well in a CEQA-exempt geothermal exploratory project that employs enhanced geothermal system technology.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if the lead agency finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law establishes the Geologic Energy Management Division in the Department of Conservation, under the direction of the State Oil and Gas Supervisor, who is required to supervise the drilling, operation, maintenance, and abandonment of wells so as to permit the owners or operators of those wells to utilize all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources, as provided. Existing law requires the division to be the lead agency for all geothermal exploratory projects for purposes of CEQA, as specified, and authorizes the division to delegate its lead agency responsibility for geothermal exploratory projects to a county that has adopted a geothermal element for its general plan. Existing law also requires the county in which a geothermal project is located to assume the responsibilities of a lead agency for a geothermal exploratory project upon the request of an applicant, as specified. Existing law defines geothermal exploratory project in part as a project composed of not more than 6 wells and associated drilling and testing equipment whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources. Existing law requires wells included within a geothermal exploratory project to be located at least one-half mile from geothermal development wells that are capable of producing geothermal resources in commercial quantities.
This bill provides that geothermal exploratory project includes, would expressly include as part of a geothermal exploratory project, among other things, equipment and activities necessary to establish interconnectivity between wells and reservoirs. The bill would exclude certain wells connecting to geothermal reservoirs from the one-half mile limit described above. The bill would, until January 1, 2031, exempt from CEQA geothermal exploratory projects that meet specified conditions and for which the county is the lead agency that meet specified conditions from CEQA. The bill would require, before the lead agencies determination of exemption, the agency. Before the lead agency determines that a geothermal exploratory project is exempt from CEQA, the bill would require a project developer to supply the lead agency with a survey including that includes specified information. The bill would authorize the lead agency to require the project applicant to file an indemnity bond bond, as specified, before it makes its determination pursuant to this exemption, as specified. the lead agency determines that a geothermal exploratory project is exempt from CEQA. The bill would require the lead agency, at least 30 days before the making the a determination to approve or carry out a change in use pursuant to this exemption, to post a written notice on its internet website and at the project site. The bill would require, if also require the lead agency to post the entire project application on its internet website. If the lead agency determines that the project is not subject to CEQA pursuant to this exemption, exempt from CEQA, the bill would require the lead agency to file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located, as provided. provided, and to provide a copy of the notice to specified entities. Because the exemption would apply to projects where the county is the lead agency and the county would be required to determine if a project qualifies for this exemption, the bill would impose a state-mandated local program.
The bill would provide that require a geothermal field development project located on a site where a geothermal exploratory project was deployed pursuant to the above-described CEQA exemption is required to use a baseline for review under CEQA review that reflects the site before the geothermal exploratory project occurred.
Existing law requires the owner or operator of a well to file a written notice of intention to commence drilling with, and prohibits any drilling until approval is given by, the supervisor or district deputy.
This bill would require, on or before January 1, 2029, the Geologic Energy Management Division to promulgate regulations for enhanced geothermal system wells, as provided. Before the promulgation and implementation of those regulations, the bill would require an operator to provide specified information to the supervisor when the operator files the notice of intent to commence drilling for a well in a CEQA-exempt geothermal exploratory project that employs enhanced geothermal system technology.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if the lead agency finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law establishes the Geologic Energy Management Division in the Department of Conservation, under the direction of the State Oil and Gas Supervisor, who is required to supervise the drilling, operation, maintenance, and abandonment of wells so as to permit the owners or operators of those wells to utilize all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources, as provided. Existing law requires the division to be the lead agency for all geothermal exploratory projects for purposes of CEQA, as specified, and authorizes the division to delegate its lead agency responsibility for geothermal exploratory projects to a county that has adopted a geothermal element for its general plan. Existing law also requires the county in which a geothermal project is located to assume the responsibilities of a lead agency for a geothermal exploratory project upon the request of an applicant, as specified. Existing law defines geothermal exploratory project in part as a project composed of not more than 6 wells and associated drilling and testing equipment whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources.
This bill provides that geothermal exploratory project includes, among other things, equipment and activities necessary to establish interconnectivity between wells and reservoirs. The bill would, until January 1, 2031, exempt geothermal exploratory projects for which the county is the lead agency that meet specified conditions from CEQA. The bill would require, before the lead agencies determination of exemption, the project developer to supply the lead agency with a survey including specified information. The bill would authorize the lead agency to require the project applicant to file an indemnity bond before it makes its determination pursuant to this exemption, as specified. The bill would require the lead agency, at least 30 days before the making the determination to approve or carry out a change in use pursuant to this exemption, to post a written notice on its internet website and at the project site. The bill would require, if the lead agency determines that the project is not subject to CEQA pursuant to this exemption, the lead agency to file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located, as provided. Because the exemption would apply to projects where the county is the lead agency and the county would be required to determine if a project qualifies for this exemption, the bill would impose a state-mandated local program.
The bill would provide that a geothermal field development project located on a site where a geothermal exploratory project was deployed pursuant to the above-described exemption is required to use a baseline for review under CEQA that reflects the site before the geothermal exploratory project occurred.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if the lead agency finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law establishes the Geologic Energy Management Division in the Department of Conservation, under the direction of the State Oil and Gas Supervisor, who is required to supervise the drilling, operation, maintenance, and abandonment of wells so as to permit the owners or operators of those wells to utilize all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources, as provided. Existing law requires the division to be the lead agency for all geothermal exploratory projects for purposes of CEQA, as specified, and authorizes the division to delegate its lead agency responsibility for geothermal exploratory projects to a county that has adopted a geothermal element for its general plan. Existing law also requires the county in which a geothermal project is located to assume the responsibilities of a lead agency for a geothermal exploratory project upon the request of an applicant, as specified. Existing law defines geothermal exploratory project in part as a project composed of not more than 6 wells and associated drilling and testing equipment whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources.
This bill provides that geothermal exploratory project includes, among other things, equipment and activities necessary to establish interconnectivity between wells and reservoirs. The bill would, until January 1, 2031, exempt geothermal exploratory projects for which the county is the lead agency that meet specified conditions from CEQA. The bill would authorize the lead agency to require the project applicant to file an indemnity bond before it makes its determination pursuant to this exemption, as specified. The bill would require the lead agency, at least 30 days before the making the determination to approve or carry out a change in use pursuant to this exemption, to post a written notice on its internet website and at the project site. The bill would require, if the lead agency determines that the project is not subject to CEQA pursuant to this exemption, the lead agency to file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located, as provided. Because the exemption would apply to projects where the county is the lead agency and the county would be required to determine if a project qualifies for this exemption, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if the lead agency finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law establishes the Geologic Energy Management Division in the Department of Conservation, under the direction of the State Oil and Gas Supervisor, who is required to supervise the drilling, operation, maintenance, and abandonment of wells so as to permit the owners or operators of those wells to utilize all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources, as provided. Existing law requires the division to be the lead agency for all geothermal exploratory projects for purposes of CEQA, as specified, and authorizes the division to delegate its lead agency responsibility for geothermal exploratory projects to a county that has adopted a geothermal element for its general plan. Existing law also requires the county in which a geothermal project is located to assume the responsibilities of a lead agency for a geothermal exploratory project upon the request of an applicant, as specified. Existing law defines geothermal exploratory project in part as a project composed of not more than 6 wells and associated drilling and testing equipment whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources.
This bill provides that geothermal exploratory project includes, among other things, equipment and activities necessary to establish interconnectivity between wells and reservoirs. The bill would would, until January 1, 2031, exempt geothermal exploratory projects for which the county is the lead agency that meet specified conditions from CEQA. The bill would authorize the lead agency to require the project applicant to file an indemnity bond before it makes its determination pursuant to this exemption, as specified. The bill would require the lead agency, at least 30 days before the making the determination to approve or carry out a change in use pursuant to this exemption, to post a written notice on its internet website and at the project site. The bill would require, if the lead agency determines that the project is not subject to CEQA pursuant to this exemption, the lead agency to file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located, as provided. Because the exemption would apply to projects where the county is the lead agency and the county would be required to determine if a project qualifies for this exemption, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if the lead agency finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law establishes the Geologic Energy Management Division in the Department of Conservation, under the direction of the State Oil and Gas Supervisor, who is required to supervise the drilling, operation, maintenance, and abandonment of wells so as to permit the owners or operators of those wells to utilize all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources, as provided. Existing law requires the division to be the lead agency for all geothermal exploratory projects for purposes of CEQA, as specified, and authorizes the division to delegate its lead agency responsibility for geothermal exploratory projects to a county that has adopted a geothermal element for its general plan. Existing law also requires the county in which a geothermal project is located to assume the responsibilities of a lead agency for a geothermal exploratory project upon the request of an applicant, as specified. Existing law defines geothermal exploratory project in part as a project composed of not more than 6 wells and associated drilling and testing equipment whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources.
This bill provides that geothermal exploratory project includes, among other things, equipment and activities necessary to establish interconnectivity between wells and reservoirs. The bill would exempt geothermal exploratory projects for which the county is the lead agency that meet specified conditions from CEQA. The bill would require the lead agency, at least 30 days before the making the determination to approve or carry out a change in use pursuant to this section, exemption, to post a written notice on its internet website and at the project site. Because the exemption would apply to projects where the county is the lead agency and the county would be required to determine if a project qualifies for this exemption, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if the lead agency finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law establishes the Geologic Energy Management Division in the Department of Conservation, under the direction of the State Oil and Gas Supervisor, who is required to supervise the drilling, operation, maintenance, and abandonment of wells so as to permit the owners or operators of those wells to utilize all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources, as provided. Existing law requires the division to be the lead agency for all geothermal exploratory projects for purposes of CEQA, as specified, and authorizes the division to delegate its lead agency responsibility for geothermal exploratory projects to a county that has adopted a geothermal element for its general plan. Existing law defines geothermal exploratory project in part as a project composed of not more than 6 wells and associated drilling and testing equipment whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources.
This bill would provide that a geothermal exploratory project, as defined, that the lead agency determines meets specified criteria is conclusively presumed to have satisfied the requirements of CEQA for the geothermal exploratory project, including to support the issuance of any permit, funding, or other approval by a state or local agency, as provided. The bill would require, for a project undertaken by a private entity that satisfies the requirements of CEQA pursuant to this provision, the project applicant to certify to the lead agency that either the entirety of the project is a public work or that certain prevailing wage requirements are satisfied.This bill provides that geothermal exploratory project includes, among other things, equipment and activities necessary to establish interconnectivity between wells and reservoirs. The bill would exempt geothermal exploratory projects that meet specified conditions from CEQA. The bill would require the lead agency, at least 30 days before the making the determination to approve or carry out a change in use pursuant to this section, to post a written notice on its internet website and at the project site.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if the lead agency finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law establishes the Geologic Energy Management Division in the Department of Conservation, under the direction of the State Oil and Gas Supervisor, who is required to supervise the drilling, operation, maintenance, and abandonment of wells so as to permit the owners or operators of those wells to utilize all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources, as provided. Existing law requires the division to be the lead agency for all geothermal exploratory projects for purposes of CEQA, as specified, and authorizes the division to delegate its lead agency responsibility for geothermal exploratory projects to a county that has adopted a geothermal element for its general plan.
This bill would provide that a geothermal exploratory project, as defined, that the lead agency determines meets specified criteria is conclusively presumed to have satisfied the requirements of CEQA for the geothermal exploratory project, including to support the issuance of any permit, funding, or other approval by a state or local agency, as provided. The bill would require, for a project undertaken by a private entity that satisfies the requirements of CEQA pursuant to this provision, the project applicant to certify to the lead agency that either the entirety of the project is a public work or that certain prevailing wage requirements are satisfied.
(a)The log described in Section 3730 shall show the character and depth of the formation passed through or encountered in the drilling of the well, the amount, size and weight of casing used, and particularly the location, depth and temperature of water-bearing strata, together with the temperature, chemical composition, and other chemical and physical characteristics of fluid encountered from time to time, so far as ascertained.
(b)For a well that is part of a geothermal exploratory project exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000)) pursuant to Section 21080.67 employing enhanced geothermal system technology, the log shall include the chemical and physical characteristics of well stimulation fluids, including additives and proppants, as defined in Sections 3150 and 3154, respectively, if any, and the amounts used for well stimulation.
SEC. 2.Section 3738 is added to the Public Resources Code, to read:3738.(a)On or before January 1, 2029, the division shall promulgate regulations for enhanced geothermal system wells, as part of an update to regulations for geothermal wells, that explicitly include and address all of the following:
(1)Seismic risks.
(2)Well construction, including the required material composition and construction design for the entire range of anticipated subsurface conditions, and the chemical composition and physical properties of the geologic formations and any geologic fluids.
(3)Fracture propagation from well stimulation.
(4)Geologic and hydrologic isolation of the geothermal fluids and reservoir.
(b)It is the intent of the Legislature that the division incorporate the development of regulations pursuant to this section in its existing effort to update geothermal regulations, previously workshopped by the division in 2018 and 2022, that is already underway to support the development of enhanced geothermal systems.
(c)Before the promulgation and implementation of enhanced geothermal system well regulations pursuant to subdivision (a), the operator, when filing a written notice of intent to commence drilling pursuant to Section 3724 for a well in a geothermal exploratory project exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000)) pursuant to Section 21080.67 employing enhanced geothermal system technology, shall provide to the supervisor all of the following information:
(1)The type of well and intended use, purpose, and approximate volume rates of injection of any well stimulation fluids.
(2)A plan for seismic monitoring and risk-based mitigation consistent with the United States Department of Energy Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems, published in January 2012, that meets or exceeds the monitoring requirements of Section 1785.1 of Title 14 of the California Code of Regulations.
(3)Full disclosure of the anticipated composition and disposition of well stimulation fluids, if planned to be used. This disclosure shall, at a minimum, include all of the following:
(A)The anticipated date of the well stimulation treatment.
(B)A complete list of names, Chemical Abstract Service (CAS) numbers, and the maximum concentration, in percent by mass, of each and every chemical constituent of the well stimulation fluids anticipated to be used. If a CAS number does not exist for a chemical constituent, the owner or operator may provide another unique identifier, if available.
(C)The trade name, the supplier, concentration, and a brief description of the intended purpose of each additive, as defined by Section 3150, including any proppants, as defined in Section 3154, contained in the anticipated well stimulation fluid.
(D)The location of the portion of the well subject to the well stimulation treatment and the extent of the fracturing or other modification, if any, in the geologic formation surrounding the well induced by the treatment.
(4)(A)The information provided pursuant to paragraphs (1) to (3), inclusive, is not confidential information pursuant to Section 3752.
(B)The information provided pursuant to paragraphs (1) to (3), inclusive, may be provided to the supervisor with the first application for a written notice of intent to commence drilling pursuant to Section 3724 for a well in a geothermal exploratory project exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000)) pursuant to Section 21080.67 and may be referenced in subsequent applications for the same project if the same information applies to all wells.
(d)(1)This section does not prohibit the supervisor from asking for additional pertinent data in considering the written notice of intent to commence drilling pursuant to subdivision (d) of Section 3724.
(2)Before the promulgation of the regulations pursuant to subdivision (a), this section does not prohibit the supervisor from approving wells that use all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources that, in each case, the supervisor deems suitable for these purposes.
SEC. 3.Section 21065.5 of the Public Resources Code is amended to read:21065.5.Geothermal exploratory project means a project as defined in Section 21065 composed of not more than six wells and associated drilling and testing equipment, including equipment and activities necessary to establish interconnectivity between wells and reservoirs, temporary roads, electric distribution lines, and infrastructure to provide power for drilling and testing equipment, whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources before commencement of a geothermal field development project as defined in Section 65928.5 of the Government Code. Wells included within a geothermal exploratory project, excluding wells connecting to geothermal reservoirs whose permeability or capacity to allow the flow of geothermal fluids, including water, has been increased from its natural or original state through stimulation, horizontal drilling, the use of closed-loop configurations, or other techniques, shall be located at least one-half mile from geothermal development wells that are capable of producing geothermal resources in commercial quantities.
SEC. 4.Section 21080.67 is added to the Public Resources Code, to read:21080.67.(a)This division does not apply to a geothermal exploratory project, as defined in Section 21065.5, for which a county or the Geologic Energy Management Division is the lead agency pursuant to Section 3715.5, including any permit, funding, or other approval by a state or local agency for the geothermal exploratory project as may be required by this division, if the lead agency determines that the geothermal exploratory project meets all of the following conditions:
(1)The project does not include the production of geothermal resources in commercial quantities.
(2)The project site is not more than 20 acres total at the surface and the project site does not disturb more than 12 acres of previously undisturbed ground at the surface. For purposes of this paragraph, undisturbed means in a natural state without industrial or other development.
(3) The project site does not include, or lie within 100 feet of, any of the following:
(A)A site that is included on any list compiled pursuant to Section 65962.5 of the Government Code.
(B)Rivers, streams, or riparian corridors, except temporary road or electric distribution line crossings. Temporary road or electrical distribution line crossings shall be undertaken pursuant to an agreement issued by the Department of Fish and Wildlife pursuant to Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code, as applicable.
(C)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code) or a habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(D)Identified habitat for species of special status identified by state or federal agencies, including species protected under the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code), and any species identified as fully protected pursuant to Sections 3511, 4700, 5050, and 5515 of the Fish and Game Code.
(E)Lands with a conservation easement unless consistent with the terms or requirements of the easement.
(4)The project site does not include, or lie within, 300 feet of wetlands, as described in subdivision (l) of Section 21067.5.
(5)Wells included within the project are set back at the surface at least 100 feet from a public road and at least 300 feet from a building that is open to the public, if present, and the property line of any adjacent properties that are not affiliated with the project or the project applicant.
(6)The project will not result in significant adverse impacts to any of the following:
(A)Natural resources, including sensitive habitats and any species of special status identified by state or federal agencies, including species protected under the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code), and any species identified as fully protected pursuant to Sections 3511, 4700, 5050, and 5515 of the Fish and Game Code.
(B)Hydrological resources, including rivers, streams, wetlands, groundwater wells, springs, and aquifers.
(C)Tribal, historical, and other cultural resources.
(7)The project applicant has provided to the lead agency a legally binding commitment to comply with Section 21183.5.
(8)The project applicant has submitted to the lead agency a preliminary description of the anticipated composition of fluids to be used for any hydraulic fracturing operations expected to occur in the geothermal exploratory project, if applicable.
(9)Unusual circumstances do not exist that would cause the project to have a significant adverse impact on the environment.
(b)(1)The project developer shall conduct a reconnaissance survey using best practices, including the identification of relevant protocols and guidelines used in conducting the survey, and shall supply the lead agency with the reconnaissance survey when applying for an exemption from this division pursuant to this section. The reconnaissance survey shall include, but is not limited to, all of the following information:
(A)The identification of natural resources including sensitive species of flora and fauna, sensitive habitats and hydrological resources including rivers, streams, wetlands, groundwater wells, springs, and aquifers. The reconnaissance survey shall include a biological resources survey that shall, at a minimum, identify any species of special status identified by state or federal agencies, including species protected under the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code), and any species identified as fully protected pursuant to Sections 3511, 4700, 5050, and 5515 of the Fish and Game Code.
(B)The identification of any tribal, historical, and other cultural resources.
(2)For purposes of this subdivision, reconnaissance survey means a survey of a proposed geothermal exploratory project site conducted before applying for an exemption from this division pursuant to this section. A reconnaissance survey does not need to include the level of detail required in an initial study.
(c)(1)Upon receipt of an application for a project pursuant to this section, the lead agency shall engage in a scoping consultation regarding the proposed development with a California Native American tribe that is traditionally and culturally affiliated with the geographic area, as described in Section 21080.3.1, of the proposed geothermal exploratory project in order to determine whether the project will result in significant adverse impacts to a tribal cultural resource. In order to expedite compliance with this subdivision, the lead agency shall contact the Native American Heritage Commission for assistance in identifying any California Native American tribe that is traditionally and culturally affiliated with the geographic area of the proposed geothermal exploratory project.
(2)The timeline for noticing and commencing a scoping consultation pursuant to this section shall be as follows:
(A)The lead agency shall provide a formal notice of an application pursuant to this section to each California Native American tribe that is traditionally and culturally affiliated with the geographic area of the proposed development within 30 days of receiving that application.
(B)Each California Native American tribe that receives a formal notice shall have 30 days from the receipt of that notice to accept the invitation to engage in a scoping consultation.
(C)If the lead agency receives a response accepting an invitation to engage in a scoping consultation, the lead agency shall commence the scoping consultation within 30 days of receiving that response.
(3)The scoping consultation shall recognize that California Native American tribes traditionally and culturally affiliated with a geographic area have knowledge and expertise concerning the resources at issue and shall take into account the cultural significance of the resources to the culturally affiliated California Native American tribe.
(4)(A)The parties to a scoping consultation conducted pursuant to this subdivision shall be the lead agency and any California Native American tribe traditionally and culturally affiliated with the geographic area of the proposed geothermal exploratory project.
(B)More than one California Native American tribe traditionally and culturally affiliated with the geographic area of the proposed geothermal exploratory project may participate in the scoping consultation. Upon request by any of the participating California Native American tribes, the lead agency shall engage in a separate scoping consultation with that California Native American tribe.
(5)The applicant and the applicants consultants may participate in a scoping consultation process conducted pursuant to this subdivision if all of the following conditions are met:
(A)The applicant and the applicants consultants agree to respect the principles set forth in this subdivision.
(B)The applicant and the applicants consultants engage in the scoping consultation in good faith.
(C)The California Native American tribe participating in the scoping consultation approves the participation of the applicant and the applicants consultants. The California Native American tribe may rescind its approval at any time during the scoping consultation, either for the duration of the scoping consultation or for any particular meeting or discussion held as part of the scoping consultation.
(6)The participants to a scoping consultation pursuant to this subdivision shall comply with the following confidentiality requirements:
(A)Section 7927.000 of the Government Code.
(B)Section 7927.005 of the Government Code.
(C)Subdivision (c) of Section 21082.3.
(D)Subdivision (d) of Section 15120 of Title 14 of the California Code of Regulations.
(E)Any additional confidentiality standards adopted by the California Native American tribe participating in the scoping consultation.
(7)A scoping consultation pursuant to this subdivision shall be deemed to be concluded if either of the following occurs:
(A)The parties to the scoping consultation document an enforceable agreement concerning methods, measures, and conditions to avoid or address potential impacts to tribal cultural resources that are or may be present.
(B)One or more parties to the scoping consultation, acting in good faith and after reasonable effort, conclude that a mutual agreement on methods, measures, and conditions to avoid or address impacts to tribal cultural resources that are or may be present cannot be reached.
(8)This division shall not apply to a scoping consultation pursuant to this subdivision.
(9)For purposes of this subdivision, the following definitions apply:
(A)Consultation means the meaningful and timely process of seeking, discussing, and considering carefully the views of others, in a manner that is cognizant of all parties cultural values and, where feasible, seeking agreement. Consultation between local governments and California Native American tribes shall be conducted in a way that is mutually respectful of each partys sovereignty. Consultation shall also recognize the tribes potential needs for confidentiality with respect to places that have traditional tribal cultural importance. A lead agency shall consult the tribal consultation best practices described in the State of California Tribal Consultation Guidelines: Supplement to General Plan Guidelines prepared by the former Office of Planning and Research.
(B)Scoping means the act of participating in early discussions or investigations between a local government and a California Native American tribe, and the development proponent if authorized by the California Native American tribe, regarding the potential effects a proposed development could have on a potential tribal cultural resource, as defined in Section 21074, or California Native American tribe as defined in Section 21073.
(C)Tribal cultural resource means a site, feature, place, cultural landscape, sacred place, including a Native American sanctified cemetery, Indian cemetery, or Indian burial area, or an object with cultural value to a California Native American tribe that is any of the following:
(i)Included or eligible for inclusion in the California Register of Historical Resources or the National Register of Historic Places.
(ii)Included in a local register of historical resources as defined in subdivision (k) of Section 5020.1.
(iii)Included in a tribal government register maintained by a Tribal Historic Preservation Officer approved by the Secretary of the Interior pursuant to Section 101 of the federal National Historic Preservation Act (54 U.S.C. Sec. 300101 et seq.).
(iv)Identified by the Native American Heritage Commission as a sacred place pursuant to Section 5097.94 or 5097.96.
(d)If the lead agency determines that a project is not subject to this division pursuant to this section, the requirements of Section 21183.5 shall apply.
(e)(1)The lead agency may require the project applicant to file an indemnity bond before it makes its determination pursuant to subdivision (a). The bond, in a form and manner prescribed by the lead agency, shall be in an amount sufficient to secure any supplemental costs beyond the applicants bonding requirements with the Geologic Energy Management Division, pursuant to Section 3725, to secure full reclamation of the project site.
(2)If a project is not subject to this division pursuant to this section, the project shall include full reclamation of all well pads, temporary routes, and other disturbances, including the reestablishment of vegetative cover with native plants, unless those disturbances are incorporated into a subsequent geothermal field development project, as defined in Section 65928.5 of the Government Code.
(f)At least 30 days before making a determination to approve a geothermal exploratory project as exempt from this division pursuant to this section, the lead agency shall post a written notice of the intent to apply the exemption at the project site and post a written notice of the intent to apply the exemption and the entire project application on its internet website.
(g)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to approve or carry out the project, the lead agency shall file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located in accordance with subdivisions (b), (c), and (d) of Section 21152. The lead agency shall provide a copy of the notice filed with the State Clearinghouse to the Department of Fish and Wildlife and the relevant California regional water quality control board.
(h)If a project is not subject to this division pursuant to this section, when making a filing pursuant to Section 3735 to the Geologic Energy Management Division of the Department of Conservation, the project developer shall include a disclosure of the composition of fluids used in all relevant hydraulic fracturing operations, and shall file a copy of the disclosure with the lead agency, if applicable.
(i)For purposes of this section, project site means land that is altered at the surface for a geothermal exploratory project that is seeking an exemption from this division pursuant to this section. Project site shall not necessarily include the entire property on which the project is located.
(j)This section is not intended, and shall not be construed, to limit consultation and discussion between a local agency and a California Native American tribe pursuant to other applicable law, confidentiality provisions pursuant to other applicable law, the protection of religious exercise to the fullest extent permitted pursuant to state and federal law, or the ability of a California Native American tribe to submit information to the local agency or participate in any process of the local agency.
(k)This section shall remain in effect only until January 1, 2031, and as of that date is repealed.
SEC. 5.Section 21080.71 is added to the Public Resources Code, to read:21080.71.A geothermal field development project located on a site where a geothermal exploratory project was deployed pursuant to Section 21080.67 shall use a baseline for review pursuant to this division that reflects the site before the deployment of the geothermal exploratory project as identified in subdivision (b) of Section 21080.67.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)The log described in Section 3730 shall show the character and depth of the formation passed through or encountered in the drilling of the well, the amount, size and weight of casing used, and particularly the location, depth and temperature of waterbearing water-bearing strata, together with the temperature, chemical composition, and other chemical and physical characteristics offluid of fluid encountered from time to time, so far as ascertained.
(b)For a well that is part of a geothermal exploratory project exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000)) pursuant to Section 21080.67 employing enhanced geothermal system technology, the log shall include the chemical and physical characteristics of well stimulation fluids, including additives and proppants, as defined in Sections 3150 and 3154, respectively, if any, and the amounts used for well stimulation.
SEC. 2.Section 3738 is added to the Public Resources Code, to read:3738.(a)On or before January 1, 2029, the division shall promulgate regulations for enhanced geothermal system wells, as part of an update to regulations for geothermal wells, that explicitly include and address all of the following:
(1)Seismic risks.
(2)Well construction, including the required material composition and construction design for the entire range of anticipated subsurface conditions, and the chemical composition and physical properties of the geologic formations, formations and any geologic fluids.
(3)Fracture propagation from well stimulation.
(4)Geologic and hydrologic isolation of the geothermal fluids and reservoir.
(b)It is the intent of the Legislature that the division incorporate the development of regulations pursuant to this section in its existing effort to update geothermal regulations, previously workshopped by the division in 2018 and 2022, that is already underway to support the development of enhanced geothermal systems.
(c)Before the promulgation and implementation of enhanced geothermal system well regulations pursuant to subdivision (a), the operator, when filing a written notice of intent to commence drilling pursuant to Section 3724 for a well in a geothermal exploratory project exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000)) pursuant to Section 21080.67 employing enhanced geothermal system technology, shall provide to the supervisor all of the following information:
(1)The type of well and intended use, purpose, and approximate volume rates of injection of any well stimulation fluids.
(1)(2)A plan for seismic monitoring and risk-based mitigation consistent with the United States Department of Energy Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems, published in January 2012, that meets or exceeds the monitoring requirements of Section 1785.1 of Title 14 of the California Code of Regulations.
(2)(3)Full disclosure of the anticipated composition and disposition of well stimulation fluids, if planned to be used. This disclosure shall, at a minimum, include all of the following:
(A)The anticipated date of the well stimulation treatment.
(B)A complete list of names, Chemical Abstract Service (CAS) numbers, and the maximum concentration, in percent by mass, of each and every chemical constituent of the well stimulation fluids anticipated to be used. If a CAS number does not exist for a chemical constituent, the owner or operator may provide another unique identifier, if available.
(C)The trade name, the supplier, concentration, and a brief description of the intended purpose of each additive, as defined by Section 3150, including any proppants, as defined in Section 3154, contained in the anticipated well stimulation fluid.
(D)The location of the portion of the well subject to the well stimulation treatment and the extent of the fracturing or other modification, if any, in the geologic formation surrounding the well induced by the treatment.
(3)(4)(A)The information provided pursuant to paragraphs (1) and (2) to (3), inclusive, is not confidential information pursuant to Section 3752.
(B)The information provided pursuant to paragraphs (1) and (2) to (3), inclusive, may be provided to the supervisor with the first application for a written notice of intent to commence drilling pursuant to Section 3724 for a well in a geothermal exploratory project exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000)) pursuant to Section 21080.67 and may be referenced in subsequent applications for the same project if the same information applies to all wells.
(d)(1)Nothing in this section prohibits This section does not prohibit the supervisor from asking for additional pertinent data in considering the written notice of intent to commence drilling pursuant to subdivision (d) of Section 3724.
(2)Nothing in this section prohibits, before Before the promulgation of the regulations pursuant to subdivision (a), the supervisors approval, pursuant to the supervisors existing authority under this chapter, of this section does not prohibit the supervisor from approving wells that use all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources that, in each case, the supervisor deems suitable for these purposes.
SEC. 3.Section 3738.5 is added to the Public Resources Code, to read:3738.5.(a)Except as provided in subdivision (b), a well that is included in a geothermal exploratory project exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000)) pursuant to Section 21080.67 shall be set back at least 300 feet from the boundary of the project site, a building that is open to the public, if present, or the property line of an adjacent property that is not part of the project.(b)A well that is included in a geothermal exploratory project exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000)) pursuant to Section 21080.67 shall be set back at least 100 feet from a public road that is necessary to access the project site.SEC. 4.SEC. 3.Section 21065.5 of the Public Resources Code is amended to read:21065.5.Geothermal exploratory project means a project as defined in Section 21065 composed of not more than six wells and associated drilling and testing equipment, including equipment and activities necessary to establish interconnectivity between wells and reservoirs, temporary roads, electric distribution lines, and infrastructure to provide power for drilling and testing equipment, whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources before commencement of a geothermal field development project as defined in Section 65928.5 of the Government Code. Wells included within a geothermal exploratory project, excluding wells connecting to geothermal reservoirs whose permeability or capacity to allow the flow of geothermal fluids, including water, has been increased from its natural or original state through stimulation, horizontal drilling, the use of closed-loop configurations, or other techniques, shall be located at least one-half mile from geothermal development wells that are capable of producing geothermal resources in commercial quantities.
SEC. 5.SEC. 4.Section 21080.67 is added to the Public Resources Code, to read:21080.67.(a)This division does not apply to a geothermal exploratory project, as defined in Section 21065.5, for which a county or the Geologic Energy Management Division is the lead agency pursuant to Section 3715.5, including any permit, funding, or other approval by a state or local agency for the geothermal exploratory project as may be required by this division, if the lead agency determines that the geothermal exploratory project meets all of the following conditions:
(1)The project does not include the production of geothermal resources in commercial quantities.
(2)The project site is not more than 20 acres total at the surface and the project site does not disturb more than 12 acres of previously undisturbed ground at the surface and not more than 20 acres total at the surface. The calculation of the 20-acre total does not include existing roads used to access the project site. surface. For purposes of this paragraph, undisturbed means in a natural state without industrial or other development.
(3) The projects footprint project site does not include, or lie within 100 feet of, any of the following, except as noted: following:
(A)Three hundred feet of wetlands as defined in subdivision (l) of Section 21067.5.(A)A site that is included on any list compiled pursuant to Section 65962.5 of the Government Code.
(B)Rivers, streams, or riparian corridors, except temporary road or electric distribution line crossings crossings. Temporary road or electrical distribution line crossings shall be undertaken pursuant to an agreement issued by the Department of Fish and Wildlife pursuant to Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code. Code, as applicable.
(C)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), Code) or a habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(D)Identified habitat for species of special status identified by state or federal agencies, including fully protected species designated by species protected under the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code). Code), and any species identified as fully protected pursuant to Sections 3511, 4700, 5050, and 5515 of the Fish and Game Code.
(E)Lands with a conservation easement unless determined consistent with the terms or requirements of the easement.
(4)Unusual circumstances do not exist that would cause the project to have a significant impact on the environment.(5)The project is not located on a site that is included on any list compiled pursuant to Section 65962.5 of the Government Code.(6)The project will not cause a substantial adverse change in the significance of a historical resource or a tribal cultural resource.(7)The project will not adversely impact any species identified as fully protected pursuant to Sections 3511, 4700, 5050, and 5515 of the Fish and Game Code, or designated for protection under the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code) as determined by the baseline biological resources survey pursuant to paragraph (1) of subdivision (b).(8)The project includes full reclamation of all well pads, temporary routes, and other disturbances, including the reestablishment of vegetative cover with native plants, unless those disturbances are incorporated into a subsequent geothermal field development project, as defined in Section 65928.5 of the Government Code.(4)The project site does not include, or lie within, 300 feet of wetlands, as described in subdivision (l) of Section 21067.5.
(5)Wells included within the project are set back at the surface at least 100 feet from a public road and at least 300 feet from a building that is open to the public, if present, and the property line of any adjacent properties that are not affiliated with the project or the project applicant.
(6)The project will not result in significant adverse impacts to any of the following:
(A)Natural resources, including sensitive habitats and any species of special status identified by state or federal agencies, including species protected under the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code), and any species identified as fully protected pursuant to Sections 3511, 4700, 5050, and 5515 of the Fish and Game Code.
(B)Hydrological resources, including rivers, streams, wetlands, groundwater wells, springs, and aquifers.
(C)Tribal, historical, and other cultural resources.
(9)(7)The project applicant has provided to the lead agency a legally binding commitment to comply with Section 21183.5.
(10)(A)The applicant(8)The project applicant has submitted to the lead agency a preliminary description of the anticipated composition of fluids to be used for any hydraulic fracturing operations expected to occur in the geothermal exploratory project. project, if applicable.
(B)When making a filing pursuant to Section 3735 to the Geologic Energy Management Division of the Department of Conservation, the applicant shall include a disclosure of the composition of fluids used in all relevant operations and shall file a copy of this disclosure with the lead agency.(b)Before the lead agency determines that a project is not subject to this division pursuant to this section, the(9)Unusual circumstances do not exist that would cause the project to have a significant adverse impact on the environment.
(b)(1)The project developer shall conduct a reconnaissance survey using best practices, including the identification of relevant protocols and guidelines used in conducting the survey, and shall supply the lead agency with a survey that includes, the reconnaissance survey when applying for an exemption from this division pursuant to this section. The reconnaissance survey shall include, but is not limited to, all of the following: following information:
(1)(A)The(A)The identification of natural resources including sensitive species of flora and fauna, sensitive habitats and hydrological resources including rivers, streams, wetlands, groundwater wells, springs, and aquifers.
(B)To comply with subparagraph (A), the project developer shall have a biological resources survey conducted in order to, The reconnaissance survey shall include a biological resources survey that shall, at a minimum, identify any species protected pursuant to any species of special status identified by state or federal agencies, including species protected under the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code), and any species identified as fully protected pursuant to Sections 3511, 4700, 5050, and 5515 of the Fish and Game Code, or species of special concern. The survey shall be conducted using best practices, including the identification of the relevant protocols and guidelines used. Code.
(2)The(B)The identification of any tribal, historical, and other cultural resources.
(2)For purposes of this subdivision, reconnaissance survey means a survey of a proposed geothermal exploratory project site conducted before applying for an exemption from this division pursuant to this section. A reconnaissance survey does not need to include the level of detail required in an initial study.
(c)(1)Upon receipt of an application for a project pursuant to this section, the lead agency shall engage in a scoping consultation regarding the proposed development with a California Native American tribe that is traditionally and culturally affiliated with the geographic area, as described in Section 21080.3.1, of the proposed geothermal exploratory project in order to determine whether the project will result in significant adverse impacts to a tribal cultural resource. In order to expedite compliance with this subdivision, the lead agency shall contact the Native American Heritage Commission for assistance in identifying any California Native American tribe that is traditionally and culturally affiliated with the geographic area of the proposed geothermal exploratory project.
(2)The timeline for noticing and commencing a scoping consultation pursuant to this section shall be as follows:
(A)The lead agency shall provide a formal notice of an application pursuant to this section to each California Native American tribe that is traditionally and culturally affiliated with the geographic area of the proposed development within 30 days of receiving that application.
(B)Each California Native American tribe that receives a formal notice shall have 30 days from the receipt of that notice to accept the invitation to engage in a scoping consultation.
(C)If the lead agency receives a response accepting an invitation to engage in a scoping consultation, the lead agency shall commence the scoping consultation within 30 days of receiving that response.
(3)The scoping consultation shall recognize that California Native American tribes traditionally and culturally affiliated with a geographic area have knowledge and expertise concerning the resources at issue and shall take into account the cultural significance of the resources to the culturally affiliated California Native American tribe.
(4)(A)The parties to a scoping consultation conducted pursuant to this subdivision shall be the lead agency and any California Native American tribe traditionally and culturally affiliated with the geographic area of the proposed geothermal exploratory project.
(B)More than one California Native American tribe traditionally and culturally affiliated with the geographic area of the proposed geothermal exploratory project may participate in the scoping consultation. Upon request by any of the participating California Native American tribes, the lead agency shall engage in a separate scoping consultation with that California Native American tribe.
(5)The applicant and the applicants consultants may participate in a scoping consultation process conducted pursuant to this subdivision if all of the following conditions are met:
(A)The applicant and the applicants consultants agree to respect the principles set forth in this subdivision.
(B)The applicant and the applicants consultants engage in the scoping consultation in good faith.
(C)The California Native American tribe participating in the scoping consultation approves the participation of the applicant and the applicants consultants. The California Native American tribe may rescind its approval at any time during the scoping consultation, either for the duration of the scoping consultation or for any particular meeting or discussion held as part of the scoping consultation.
(6)The participants to a scoping consultation pursuant to this subdivision shall comply with the following confidentiality requirements:
(A)Section 7927.000 of the Government Code.
(B)Section 7927.005 of the Government Code.
(C)Subdivision (c) of Section 21082.3.
(D)Subdivision (d) of Section 15120 of Title 14 of the California Code of Regulations.
(E)Any additional confidentiality standards adopted by the California Native American tribe participating in the scoping consultation.
(7)A scoping consultation pursuant to this subdivision shall be deemed to be concluded if either of the following occurs:
(A)The parties to the scoping consultation document an enforceable agreement concerning methods, measures, and conditions to avoid or address potential impacts to tribal cultural resources that are or may be present.
(B)One or more parties to the scoping consultation, acting in good faith and after reasonable effort, conclude that a mutual agreement on methods, measures, and conditions to avoid or address impacts to tribal cultural resources that are or may be present cannot be reached.
(8)This division shall not apply to a scoping consultation pursuant to this subdivision.
(9)For purposes of this subdivision, the following definitions apply:
(A)Consultation means the meaningful and timely process of seeking, discussing, and considering carefully the views of others, in a manner that is cognizant of all parties cultural values and, where feasible, seeking agreement. Consultation between local governments and California Native American tribes shall be conducted in a way that is mutually respectful of each partys sovereignty. Consultation shall also recognize the tribes potential needs for confidentiality with respect to places that have traditional tribal cultural importance. A lead agency shall consult the tribal consultation best practices described in the State of California Tribal Consultation Guidelines: Supplement to General Plan Guidelines prepared by the former Office of Planning and Research.
(B)Scoping means the act of participating in early discussions or investigations between a local government and a California Native American tribe, and the development proponent if authorized by the California Native American tribe, regarding the potential effects a proposed development could have on a potential tribal cultural resource, as defined in Section 21074, or California Native American tribe as defined in Section 21073.
(C)Tribal cultural resource means a site, feature, place, cultural landscape, sacred place, including a Native American sanctified cemetery, Indian cemetery, or Indian burial area, or an object with cultural value to a California Native American tribe that is any of the following:
(i)Included or eligible for inclusion in the California Register of Historical Resources or the National Register of Historic Places.
(ii)Included in a local register of historical resources as defined in subdivision (k) of Section 5020.1.
(iii)Included in a tribal government register maintained by a Tribal Historic Preservation Officer approved by the Secretary of the Interior pursuant to Section 101 of the federal National Historic Preservation Act (54 U.S.C. Sec. 300101 et seq.).
(iv)Identified by the Native American Heritage Commission as a sacred place pursuant to Section 5097.94 or 5097.96.
(c)(d)If the lead agency determines that a project is not subject to this division pursuant to this section, the requirements of Section 21183.5 shall apply.
(d)The lead(e)(1)The lead agency may require the project applicant to file an indemnity bond before it makes its determination pursuant to subdivision (a). The bond, in a form and manner prescribed by the lead agency, shall be in an amount sufficient to secure any supplemental costs beyond the applicants bonding requirements with the Geologic Energy Management Division, pursuant to Section 3725, to secure full reclamation of the project site.
(2)If a project is not subject to this division pursuant to this section, the project shall include full reclamation of all well pads, temporary routes, and other disturbances, including the reestablishment of vegetative cover with native plants, unless those disturbances are incorporated into a subsequent geothermal field development project, as defined in Section 65928.5 of the Government Code.
(e)(f)At least 30 days before making a determination to approve or carry out a change in use a geothermal exploratory project as exempt from this division pursuant to this section, the lead agency shall post a written notice of the intent to apply the exemption on its internet website and at the project site. The lead agency shall site and post a written notice of the intent to apply the exemption and the entire project application on its internet website.
(f)(g)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to approve or carry out the project, the lead agency shall file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located in accordance with subdivisions (b), (c), and (d) of Section 21152. The lead agency shall provide a copy of the notice filed with the State Clearinghouse to the Department of Fish and Wildlife and the relevant California regional water quality control board.
(h)If a project is not subject to this division pursuant to this section, when making a filing pursuant to Section 3735 to the Geologic Energy Management Division of the Department of Conservation, the project developer shall include a disclosure of the composition of fluids used in all relevant hydraulic fracturing operations, and shall file a copy of the disclosure with the lead agency, if applicable.
(i)For purposes of this section, project site means land that is altered at the surface for a geothermal exploratory project that is seeking an exemption from this division pursuant to this section. Project site shall not necessarily include the entire property on which the project is located.
(j)This section is not intended, and shall not be construed, to limit consultation and discussion between a local agency and a California Native American tribe pursuant to other applicable law, confidentiality provisions pursuant to other applicable law, the protection of religious exercise to the fullest extent permitted pursuant to state and federal law, or the ability of a California Native American tribe to submit information to the local agency or participate in any process of the local agency.
(g)(k)This section shall remain in effect only until January 1, 2031, and as of that date is repealed.
SEC. 6.SEC. 5.Section 21080.71 is added to the Public Resources Code, to read:21080.71.A geothermal field development project located on a site where a geothermal exploratory project was deployed pursuant to Section 21080.67 shall use a baseline for review pursuant to this division that reflects the site before the deployment of the geothermal exploratory project as identified in subdivision (b) of Section 21080.67.
SEC. 7.SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)The log described in Section 3730 shall show the character and depth of the formation passed through or encountered in the drilling of the well, the amount, size and weight of casing used, and particularly the location, depth and temperature of waterbearing strata, together with the temperature, chemical composition, and other chemical and physical characteristics offluid encountered from time to time, so far as ascertained.
(b)For a well that is part of a geothermal exploratory project exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000)) pursuant to Section 21080.67 employing enhanced geothermal system technology, the log shall include the chemical and physical characteristics of well stimulation fluids, including additives and proppants, as defined in Sections 3150 and 3154, respectively, if any, and the amounts used for well stimulation.
SEC. 2.Section 3738 is added to the Public Resources Code, to read:3738.(a)On or before January 1, 2029, the division shall promulgate regulations for enhanced geothermal system wells, as part of an update to regulations for geothermal wells, that explicitly include and address all of the following:
(1)Seismic risks.
(2)Well construction, including the required material composition and construction design for the entire range of anticipated subsurface conditions, the chemical composition and physical properties of the geologic formations, and any geologic fluids.
(3)Fracture propagation from well stimulation.
(4)Geologic and hydrologic isolation of the geothermal fluids and reservoir.
(b)It is the intent of the Legislature that the division incorporate the development of regulations pursuant to this section in its existing effort to update geothermal regulations, previously workshopped by the division in 2018 and 2022, that is already underway to support the development of enhanced geothermal systems.
(c)Before the promulgation and implementation of enhanced geothermal system well regulations pursuant to subdivision (a), the operator, when filing a written notice of intent to commence drilling pursuant to Section 3724 for a well in a geothermal exploratory project exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000)) pursuant to Section 21080.67 employing enhanced geothermal system technology, shall provide to the supervisor all of the following information:
(1)A plan for seismic monitoring consistent with the United States Department of Energy Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems, published in January 2012, that meets or exceeds the monitoring requirements of Section 1785.1 of Title 14 of the California Code of Regulations.
(2)Full disclosure of the anticipated composition and disposition of well stimulation fluids, if planned to be used. This disclosure shall, at a minimum, include all of the following:
(A)The anticipated date of the well stimulation treatment.
(B)A complete list of names, Chemical Abstract Service (CAS) numbers, and the maximum concentration, in percent by mass, of each and every chemical constituent of the well stimulation fluids anticipated to be used. If a CAS number does not exist for a chemical constituent, the owner or operator may provide another unique identifier, if available.
(C)The trade name, the supplier, concentration, and a brief description of the intended purpose of each additive, as defined by Section 3150, including any proppants, as defined in Section 3154, contained in the anticipated well stimulation fluid.
(D)The location of the portion of the well subject to the well stimulation treatment and the extent of the fracturing or other modification, if any, in the geologic formation surrounding the well induced by the treatment.
(3)(A)The information provided pursuant to paragraphs (1) and (2) is not confidential information pursuant to Section 3752.
(B)The information provided pursuant to paragraphs (1) and (2) may be provided to the supervisor with the first application for a written notice of intent to commence drilling pursuant to Section 3724 for a well in a geothermal exploratory project exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000)) pursuant to Section 21080.67 and may be referenced in subsequent applications for the same project if the same information applies to all wells.
(d)(1)Nothing in this section prohibits the supervisor from asking for additional pertinent data in considering the written notice of intent to commence drilling pursuant to subdivision (d) of Section 3724.
(2)Nothing in this section prohibits, before the promulgation of the regulations pursuant to subdivision (a), the supervisors approval, pursuant to the supervisors existing authority under this chapter, of wells that use all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources that, in each case, the supervisor deems suitable for these purposes.
SEC. 3.Section 3738.5 is added to the Public Resources Code, to read:3738.5.(a)Except as provided in subdivision (b), a well that is included in a geothermal exploratory project exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000)) pursuant to Section 21080.67 shall be set back at least 300 feet from the boundary of the project site, a building that is open to the public, if present, or the property line of an adjacent property that is not part of the project.
(b)A well that is included in a geothermal exploratory project exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000)) pursuant to Section 21080.67 shall be set back at least 100 feet from a public road that is necessary to access the project site.
SEC. 2.SEC. 4.Section 21065.5 of the Public Resources Code is amended to read:21065.5.Geothermal exploratory project means a project as defined in Section 21065 composed of not more than six wells and associated drilling and testing equipment, including equipment and activities necessary to establish interconnectivity between wells and reservoirs, temporary roads, electric distribution lines, and infrastructure to provide power for drilling and testing equipment, whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources before commencement of a geothermal field development project as defined in Section 65928.5 of the Government Code. Wells included within a geothermal exploratory project, excluding wells connecting to geothermal reservoirs whose permeability has been increased from its natural or original state through stimulation, horizontal drilling, or other techniques, shall be located at least one-half mile from geothermal development wells that are capable of producing geothermal resources in commercial quantities.
SEC. 3.SEC. 5.Section 21080.67 is added to the Public Resources Code, to read:21080.67.(a)This division does not apply to a geothermal exploratory project, as defined in Section 21065.5, for which a county is the lead agency pursuant to Section 3715.5, including any permit, funding, or other approval by a state or local agency for the geothermal exploratory project as may be required by this division, if the lead agency determines that the geothermal exploratory project meets all of the following conditions:
(1)The project does not include the production of geothermal resources in commercial quantities.
(2)The project does not disturb more than 12 acres of previously undisturbed ground. ground at the surface and not more than 20 acres total at the surface. The calculation of the 20-acre total does not include existing roads used to access the project site. For purposes of this paragraph, undisturbed means in a natural state without industrial or other development.
(3)The projects footprint does not include, or lie within 100 feet of, any of the following: following, except as noted:
(A)Wetlands. Three hundred feet of wetlands as defined in subdivision (l) of Section 21067.5.
(B)Rivers, streams, or riparian corridors, except temporary road or electric distribution line crossings undertaken pursuant to an agreement issued by the Department of Fish and Wildlife pursuant to Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code.
(C)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), a habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(D)Identified habitat for species of special status identified by state or federal agencies, including fully protected species designated by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(E)Lands with a conservation easement unless determined consistent with the terms or requirements of the easement.
(4)Unusual circumstances do not exist that would cause the project to have a significant impact on the environment.
(5)The project is not located on a site that is included on any list compiled pursuant to Section 65962.5 of the Government Code.
(6)The project will not cause a substantial adverse change in the significance of a historical resource or a tribal cultural resource.
(7)The project will not adversely impact any species identified as fully protected pursuant to Sections 3511, 4700, 5050, and 5515 of the Fish and Game Code, or designated for protection under the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code) as determined by the baseline biological resources survey pursuant to paragraph (1) of subdivision (b).
(7)(8)The project includes full reclamation of all well pads, temporary routes, and other disturbances, including the reestablishment of vegetative cover with native plants, unless those disturbances are incorporated into a subsequent geothermal field development project, as defined in Section 65928.5 of the Government Code.
(8)(9)The project applicant has provided to the lead agency a legally binding commitment to comply with Section 21183.5.
(9)(1)(10)(A)The applicant has submitted to the lead agency a preliminary description of the anticipated composition of fluids to be used for any hydraulic fracturing operations expected to occur in the geothermal exploratory project.
(2)(B)When making a filing pursuant to Section 3735, 3735 to the Geologic Energy Management Division of the Department of Conservation, the applicant shall include a disclosure of the composition of fluids used in all relevant operations and shall file a copy of this disclosure with the lead agency.
(b)Before the lead agency determines that a project is not subject to this division pursuant to this section, the project developer shall supply the lead agency with a survey that includes, but is not limited to, all of the following:
(1)The (A)The identification of natural resources including sensitive species of flora and fauna, sensitive habitats and hydrological resources including groundwater wells, springs, and aquifers.
(B)To comply with subparagraph (A), the project developer shall have a biological resources survey conducted in order to, at a minimum, identify any species protected pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code), identified as fully protected pursuant to Sections 3511, 4700, 5050, and 5515 of the Fish and Game Code, or species of special concern. The survey shall be conducted using best practices, including the identification of the relevant protocols and guidelines used.
(2)The identification of any tribal, historical, and other cultural resources.
(c)If the lead agency determines that a project is not subject to this division pursuant to this section, the requirements of Section 21183.5 shall apply.
(d)The lead agency may require the project applicant to file an indemnity bond before it makes its determination pursuant to subdivision (a). The bond, in a form and manner prescribed by the lead agency, shall be in an amount sufficient to secure any supplemental costs beyond the applicants bonding requirements with the Geologic Energy Management Division, pursuant to Section 3725, to secure full reclamation of the project site.
(e)At least 30 days before making a determination to approve or carry out a change in use pursuant to this section, the lead agency shall post a written notice of the intent to apply the exemption on its internet website and at the project site. The lead agency shall post the entire project application on its internet website.
(f)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to approve or carry out the project, the lead agency shall file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located in accordance with subdivisions (b), (c), and (d) of Section 21152. The lead agency shall provide a copy of the notice filed with the State Clearinghouse to the Department of Fish and Wildlife and the relevant California regional water quality control board.
(g)This section shall remain in effect only until January 1, 2031, and as of that date is repealed.
SEC. 4.SEC. 6.Section 21080.71 is added to the Public Resources Code, to read:21080.71.A geothermal field development project located on a site where a geothermal exploratory project was deployed pursuant to Section 21080.67 shall use a baseline for review pursuant to this division that reflects the site before the deployment of the geothermal exploratory project as identified in subdivision (b) of Section 21080.67.
SEC. 5.SEC. 7.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)On October 22, 2024, the United States Department of the Interior, under the leadership of President Joseph Biden and Secretary of the Interior Deb Haaland, introduced a new categorical exclusion from the National Environmental Policy Act for geothermal resource confirmation activities, also known as geothermal exploratory projects, on federal lands.
(b)This exclusion reflects a recognition that geothermal exploratory projects are temporary activities that, when meeting a high standard of environmental care and stewardship, should result in no permanent negative impacts on the environment.
(c)Geothermal exploration is the necessary first phase of developing new geothermal energy resources, including next-generation geothermal energy resources like advanced closed-loop and enhanced geothermal systems. California markets feature a very high demand for geothermal energy, in part driven by Public Utilities Commission decisions 21-06-035 (June 24, 2021), Decision Requiring Procurement to Address Mid-Term Reliability (2023-2026), and 24-08-064 (August 22, 2024), Decision Determining Need for Centralized Procurement of Long Lead-Time Resources, which directed Californias load-serving entities and the Department of Water Resources to procure significant amounts of new geothermal energy over the years to come.
(d)The resource portfolios identified by the Public Utilities Commission to meet state climate goals are increasingly relying on out-of-state next-generation geothermal energy development, which both put Californias climate goals at risk and establishes an unnecessary but permanent export of wealth by California ratepayers.
(e)The first commercial-scale next-generation geothermal energy resources are currently under development in Nevada and Utah due to those states favorable regulatory environments, but nearly all of that energy is anticipated to be sold to buyers in California.
(f)Over 80 percent of Nevada and over 60 percent of Utah are federal lands where the categorical exclusion will apply, as compared to less than one-half of land in California. This has the potential to exacerbate the perceived favorability of those states regulatory environments and drive more development aimed at supplying the California market out of California.
(g)California must take an active role in ensuring that new geothermal energy projects built to supply the California market lead to investment and job creation in California and do not lead to the export of investment, industry knowledge, and the California geothermal, oil, and gas workforce to neighboring states.
(h)Next-generation geothermal energy development presents a significant opportunity to attract investment capital and realize community economic development and workforce development benefits in California, including the development and preservation of a skilled and trained construction workforce to carry out projects, long-term apprenticeship and job creation, and the development of a next-generation geothermal energy supply chain.
(i)California launched the global revolution in conventional geothermal technologies in the 20th century. It has the geologic resources, workforce, and clean energy economy to do so again in the 21st century if decisive state action is taken today. The National Renewable Energy Laboratory estimates that there could be 27.9 gigawatts of development of next-generation geothermal resources in California by 2050over double that of any other state.
(j)Aligning state law with forward-thinking federal policy on geothermal exploration is a critical component of building a strong geothermal energy economy in California.
SEC. 2.Section 21065.5 of the Public Resources Code is amended to read:21065.5.Geothermal exploratory project means a project as defined in Section 21065 composed of not more than six wells and associated drilling and testing equipment, including equipment and activities necessary to establish interconnectivity between wells and reservoirs, temporary roads, electric distribution lines, and infrastructure to provide power for drilling and testing equipment, whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources before commencement of a geothermal field development project as defined in Section 65928.5 of the Government Code.
SEC. 3.Section 21080.67 is added to the Public Resources Code, to read:21080.67.(a)This division does not apply to a geothermal exploratory project, as defined in Section 21065.5, for which a county is the lead agency pursuant to Section 3715.5, including any permit, funding, or other approval by a state or local agency for the geothermal exploratory project as may be required by this division, if the lead agency determines that the geothermal exploratory project meets all of the following conditions:
(1)The project does not include the production of geothermal resources in commercial quantities.
(2)The project does not disturb more than 12 acres of previously undisturbed ground.
(3)The projects footprint does not include, or lie within 100 feet of, any of the following:
(A)Wetlands.
(B)Rivers, streams, or riparian corridors, except temporary road or electric distribution line crossings undertaken pursuant to an agreement issued by the Department of Fish and Wildlife pursuant to Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code.
(C)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), a habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(D)Identified habitat for species of special status identified by state or federal agencies, including fully protected species designated by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(E)Lands with a conservation easement unless determined consistent with the terms or requirements of the easement.
(4)Unusual circumstances do not exist that would cause the project to have a significant impact on the environment.
(5)The project is not located on a site that is included on any list compiled pursuant to Section 65962.5 of the Government Code.
(6)The project will not cause a substantial adverse change in the significance of a historical resource or a tribal cultural resource.
(7)The project includes full reclamation of all well pads, temporary routes, and other disturbances, including the reestablishment of vegetative cover with native plants, unless those disturbances are incorporated into a subsequent geothermal field development project, as defined in Section 65928.5 of the Government Code.
(8)The project applicant has provided to the lead agency a legally binding commitment to comply with Section 21183.5.
(9)(1)The applicant has submitted to the lead agency a preliminary description of the anticipated composition of fluids to be used for any hydraulic fracturing operations expected to occur in the geothermal exploratory project.
(2)When making a filing pursuant to Section 3735, the applicant shall include a disclosure of the composition of fluids used in all relevant operations and shall file a copy of this disclosure with the lead agency.
(b)Before the lead agency determines that a project is not subject to this division pursuant to this section, the project developer shall supply the lead agency with a survey that includes, but is not limited to, all of the following:
(1)The identification of natural resources including sensitive species of flora and fauna, sensitive habitats and hydrological resources including groundwater wells, springs, and aquifers.
(2)The identification of any tribal, historical, and other cultural resources.
(b)(c)If the lead agency determines that a project is not subject to this division pursuant to this section, the requirements of Section 21183.5 shall apply.
(c)(d)The lead agency may require the project applicant to file an indemnity bond before it makes its determination pursuant to subdivision (a). The bond, in a form and manner prescribed by the lead agency, shall be in an amount sufficient to secure any supplemental costs beyond the applicants bonding requirements with the Geologic Energy Management Division, pursuant to Section 3725, to secure full reclamation of the project site.
(d)(e)At least 30 days before making a determination to approve or carry out a change in use pursuant to this section, the lead agency shall post a written notice of the intent to apply the exemption on its internet website and at the project site.
(e)(f)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to approve or carry out the project, the lead agency shall file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located in accordance with subdivisions (b), (c), and (d) of Section 21152.
(f)(g)This section shall remain in effect only until January 1, 2031, and as of that date is repealed.
SEC. 4.Section 21080.71 is added to the Public Resources Code, to read:21080.71.A geothermal field development project located on a site where a geothermal exploratory project was deployed pursuant to Section 21080.67 shall use a baseline for review pursuant to this division that reflects the site before the deployment of the geothermal exploratory project as identified in subdivision (b) of Section 21080.67.
SEC. 4.SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)On October 22, 2024, the United States Department of the Interior, under the leadership of President Joseph Biden and Secretary of the Interior Deb Haaland, introduced a new categorical exclusion from the National Environmental Policy Act for geothermal resource confirmation activities, also known as geothermal exploratory projects, on federal lands.
(b)This exclusion reflects a recognition that geothermal exploratory projects are temporary activities that, when meeting a high standard of environmental care and stewardship, should result in no permanent negative impacts on the environment.
(c)Geothermal exploration is the necessary first phase of developing new geothermal energy resources, including next-generation geothermal energy resources like advanced closed-loop and enhanced geothermal systems. California markets feature a very high demand for geothermal energy, in part driven by Public Utilities Commission decisions 21-06-035 (June 24, 2021), Decision Requiring Procurement to Address Mid-Term Reliability (2023-2026), and 24-08-064 (August 22, 2024), Decision Determining Need for Centralized Procurement of Long Lead-Time Resources, which directed Californias load-serving entities and the Department of Water Resources to procure significant amounts of new geothermal energy over the years to come.
(d)The resource portfolios identified by the Public Utilities Commission to meet state climate goals are increasingly relying on out-of-state next-generation geothermal energy development, which both put Californias climate goals at risk and establishes an unnecessary but permanent export of wealth by California ratepayers.
(e)The first commercial-scale next-generation geothermal energy resources are currently under development in Nevada and Utah due to those states favorable regulatory environments, but nearly all of that energy is anticipated to be sold to buyers in California.
(f)Over 80 percent of Nevada and over 60 percent of Utah are federal lands where the categorical exclusion will apply, as compared to less than one-half of land in California. This has the potential to exacerbate the perceived favorability of those states regulatory environments and drive more development aimed at supplying the California market out of California.
(g)California must take an active role in ensuring that new geothermal energy projects built to supply the California market lead to investment and job creation in California and do not lead to the export of investment, industry knowledge, and the California geothermal, oil, and gas workforce to neighboring states.
(h)Next-generation geothermal energy development presents a significant opportunity to attract investment capital and realize community economic development and workforce development benefits in California, including the development and preservation of a skilled and trained construction workforce to carry out projects, long-term apprenticeship and job creation, and the development of a next-generation geothermal energy supply chain.
(i)California launched the global revolution in conventional geothermal technologies in the 20th century. It has the geologic resources, workforce, and clean energy economy to do so again in the 21st century if decisive state action is taken today. The National Renewable Energy Laboratory estimates that there could be 27.9 gigawatts of development of next-generation geothermal resources in California by 2050over double that of any other state.
(j)Aligning state law with forward-thinking federal policy on geothermal exploration is a critical component of building a strong geothermal energy economy in California.
SEC. 2.Section 21065.5 of the Public Resources Code is amended to read:21065.5.Geothermal exploratory project means a project as defined in Section 21065 composed of not more than six wells and associated drilling and testing equipment, including equipment and activities necessary to establish interconnectivity between wells and reservoirs, temporary roads, electric distribution lines, and infrastructure to provide power for drilling and testing equipment, whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources before commencement of a geothermal field development project as defined in Section 65928.5 of the Government Code.
SEC. 3.Section 21080.67 is added to the Public Resources Code, to read:21080.67.(a)This division does not apply to a geothermal exploratory project, as defined in Section 21065.5, for which a county is the lead agency pursuant to Section 3715.5, including any permit, funding, or other approval by a state or local agency for the geothermal exploratory project as may be required by this division, if the lead agency determines that the geothermal exploratory project meets all of the following conditions:
(1)The project does not include the production of geothermal resources in commercial quantities.
(2)The project does not disturb more than 12 acres of previously undisturbed ground.
(3)The projects footprint does not include, or lie within 100 feet of, any of the following:
(A)Wetlands.
(B)Rivers, streams, or riparian corridors, except temporary road or electric distribution line crossings undertaken pursuant to an agreement issued by the Department of Fish and Wildlife pursuant to Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code.
(C)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), a habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(D)Identified habitat for species of special status identified by state or federal agencies, including fully protected species designated by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(E)Lands with a conservation easement unless determined consistent with the terms or requirements of the easement.
(4)Unusual circumstances do not exist that would cause the project to have a significant impact on the environment.
(5)The project is not located on a site that is included on any list compiled pursuant to Section 65962.5 of the Government Code.
(6)The project will not cause a substantial adverse change in the significance of a historical resource or a tribal cultural resource.
(7)The project includes full reclamation of all well pads, temporary routes, and other disturbances, including the reestablishment of vegetative cover with native plants, unless those disturbances are incorporated into a subsequent geothermal field development project, as defined in Section 65928.5 of the Government Code.
(8)The project applicant has certified to the lead agency that either of the following is true: provided to the lead agency a legally binding commitment to comply with Section 21183.5.
(A)The entirety of the geothermal exploratory project is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.(B)If the geothermal exploratory project is not in its entirety a public work, all construction workers employed in the execution of the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the geothermal exploratory project is subject to this subparagraph, then, for those portions of the project that are not a public work, both of the following shall apply:(i)The project applicant shall ensure that the prevailing wage requirement is included in all contracts for the performance of the work.(ii)All contractors and subcontractors shall pay to all construction workers employed in the execution of the work at least the general prevailing rate of per diem wages, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.(b)If the lead agency determines that a project is not subject to this division pursuant to this section, the requirements of Section 21183.5 shall apply.
(b)(c)The lead agency may require the project applicant to file an indemnity bond before it makes its determination pursuant to subdivision (a). The bond, in a form and manner prescribed by the lead agency, shall be in an amount sufficient to secure any supplemental costs beyond the applicants bonding requirements with the Geologic Energy Management Division, pursuant to Section 3725, to secure full reclamation of the project site.
(c)(d)At least 30 days before making a determination to approve or carry out a change in use pursuant to this section, the lead agency shall post a written notice of the intent to apply the exemption on its internet website and at the project site.
(d)(e)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to approve or carry out the project, the lead agency shall file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located in accordance with subdivisions (b), (c), and (d) of Section 21152.
(e)(f)This section shall remain in effect only until January 1, 2031, and as of that date is repealed.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)On October 22, 2024, the United States Department of the Interior, under the leadership of President Joseph Biden and Secretary of the Interior Deb Haaland, introduced a new categorical exclusion from the National Environmental Policy Act for geothermal resource confirmation activities, also known as geothermal exploratory projects, on federal lands.
(b)This exclusion reflects a recognition that geothermal exploratory projects are temporary activities that, when meeting a high standard of environmental care and stewardship, should result in no permanent negative impacts on the environment.
(c)Geothermal exploration is the necessary first phase of developing new geothermal energy resources, including next-generation geothermal energy resources like advanced closed-loop and enhanced geothermal systems. California markets feature a very high demand for geothermal energy, in part driven by Public Utilities Commission decisions 21-06-035 (June 24, 2021), Decision Requiring Procurement to Address Mid-Term Reliability (2023-2026), and 24-08-064 (August 22, 2024), Decision Determining Need for Centralized Procurement of Long Lead-Time Resources, which directed Californias load-serving entities and the Department of Water Resources to procure significant amounts of new geothermal energy over the years to come.
(d)The resource portfolios identified by the Public Utilities Commission to meet state climate goals are increasingly relying on out-of-state next-generation geothermal energy development, which both put Californias climate goals at risk and establishes an unnecessary but permanent export of wealth by California ratepayers.
(e)The first commercial-scale next-generation geothermal energy resources are currently under development in Nevada and Utah due to those states favorable regulatory environments, but nearly all of that energy is anticipated to be sold to buyers in California.
(f)Over 80 percent of Nevada and over 60 percent of Utah are federal lands where the categorical exclusion will apply, as compared to less than one-half of land in California. This has the potential to exacerbate the perceived favorability of those states regulatory environments and drive more development aimed at supplying the California market out of California.
(g)California must take an active role in ensuring that new geothermal energy projects built to supply the California market lead to investment and job creation in California and do not lead to the export of investment, industry knowledge, and the California geothermal, oil, and gas workforce to neighboring states.
(h)Next-generation geothermal energy development presents a significant opportunity to attract investment capital and realize community economic development and workforce development benefits in California, including the development and preservation of a skilled and trained construction workforce to carry out projects, long-term apprenticeship and job creation, and the development of a next-generation geothermal energy supply chain.
(i)California launched the global revolution in conventional geothermal technologies in the 20th century. It has the geologic resources, workforce, and clean energy economy to do so again in the 21st century if decisive state action is taken today. The National Renewable Energy Laboratory estimates that there could be 27.9 gigawatts of development of next-generation geothermal resources in California by 2050over double that of any other state.
(j)Aligning state law with forward-thinking federal policy on geothermal exploration is a critical component of building a strong geothermal energy economy in California.
SEC. 2.Section 21065.5 of the Public Resources Code is amended to read:21065.5.Geothermal exploratory project means a project as defined in Section 21065 composed of not more than six wells and associated drilling and testing equipment, including equipment and activities necessary to establish interconnectivity between wells and reservoirs, temporary roads, electric distribution lines, and infrastructure to provide power for drilling and testing equipment, whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources before commencement of a geothermal field development project as defined in Section 65928.5 of the Government Code.
SEC. 3.Section 21080.67 is added to the Public Resources Code, to read:21080.67.(a)This division does not apply to a geothermal exploratory project, as defined in Section 21065.5, for which a county is the lead agency pursuant to Section 3715.5, including any permit, funding, or other approval by a state or local agency for the geothermal exploratory project as may be required by this division, if the lead agency determines that the geothermal exploratory project meets all of the following conditions:
(1)The project does not include the production of geothermal resources in commercial quantities.
(2)The project does not disturb more than 20 12 acres of previously undisturbed ground.
(3)The projects footprint does not include include, or lie within 100 feet of, any of the following:
(A)Wetlands.
(B)Rivers, streams, or riparian corridors, except temporary road or electric distribution line crossings. crossings undertaken pursuant to an agreement issued by the Department of Fish and Wildlife pursuant to Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code.
(C)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), a habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(D)Identified habitat for species of special status identified by state or federal agencies, including fully protected species designated by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(E)Lands with a conservation easement unless determined consistent with the terms or requirements of the easement.
(4)Unusual circumstances do not exist that would cause the project to have a significant impact on the environment.
(5)The project is not located on a site that is included on any list compiled pursuant to Section 65962.5 of the Government Code.
(6)The project will not cause a substantial adverse change in the significance of a historical resource or a tribal cultural resource.
(7)The project includes full reclamation of all well pads, temporary routes, and other disturbances, including the reestablishment of vegetative cover with native plants, unless those disturbances are incorporated into a subsequent geothermal field development project, as defined in Section 65928.5 of the Government Code.
(8)The project applicant has certified to the lead agency that either of the following is true:
(A)The entirety of the geothermal exploratory project is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(B)If the geothermal exploratory project is not in its entirety a public work, all construction workers employed in the execution of the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the geothermal exploratory project is subject to this subparagraph, then, for those portions of the project that are not a public work, both of the following shall apply:
(i)The project applicant shall ensure that the prevailing wage requirement is included in all contracts for the performance of the work.
(ii)All contractors and subcontractors shall pay to all construction workers employed in the execution of the work at least the general prevailing rate of per diem wages, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.
(b)The lead agency may require the project applicant to file an indemnity bond before it makes its determination pursuant to subdivision (a). The bond, in a form and manner prescribed by the lead agency, shall be in an amount sufficient to secure any supplemental costs beyond the applicants bonding requirements with the Geologic Energy Management Division, pursuant to Section 3725, to secure full reclamation of the project site.
(b)(c)At least 30 days before making a determination to approve or carry out a change in use pursuant to this section, the lead agency shall post a written notice of the intent to apply the exemption on its internet website and at the project site.
(d)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to approve or carry out the project, the lead agency shall file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located in accordance with subdivisions (b), (c), and (d) of Section 21152.
(e)This section shall remain in effect only until January 1, 2031, and as of that date is repealed.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)On October 22, 2024, the United States Department of the Interior, under the leadership of President Joseph Biden and Secretary of the Interior Deb Haaland, introduced a new categorical exclusion from the National Environmental Policy Act for geothermal resource confirmation activities, also known as geothermal exploratory projects, on federal lands.
(b)This exclusion reflects a recognition that geothermal exploratory projects are temporary activities that, when meeting a high standard of environmental care and stewardship, should result in no permanent negative impacts on the environment.
(c)Geothermal exploration is the necessary first phase of developing new geothermal energy resources, including next-generation geothermal energy resources like advanced closed-loop and enhanced geothermal systems. California markets feature a very high demand for geothermal energy, in part driven by Public Utilities Commission decisions 21-06-035 (June 24, 2021), Decision Requiring Procurement to Address Mid-Term Reliability (2023-2026), and 24-08-064 (August 22, 2024), Decision Determining Need for Centralized Procurement of Long Lead-Time Resources, which directed Californias load-serving entities and the Department of Water Resources to procure significant amounts of new geothermal energy over the years to come.
(d)The resource portfolios identified by the Public Utilities Commission to meet state climate goals are increasingly relying on out-of-state next-generation geothermal energy development, which both put Californias climate goals at risk and establishes an unnecessary but permanent export of wealth by California ratepayers.
(e)The first commercial-scale next-generation geothermal energy resources are currently under development in Nevada and Utah due to those states favorable regulatory environments, but nearly all of that energy is anticipated to be sold to buyers in California.
(f)Over 80 percent of Nevada and over 60 percent of Utah are federal lands where the categorical exclusion will apply, as compared to less than half one-half of land in California. This has the potential to exacerbate the perceived favorability of those states regulatory environments and drive more development aimed at supplying the California market out of California.
(g)California must take an active role in ensuring that new geothermal energy projects built to supply the California market lead to investment and job creation in California and do not lead to the export of investment, industry knowledge, and the California geothermal, oil, and gas workforce to neighboring states.
(h)Next-generation geothermal energy development presents a significant opportunity to attract investment capital and realize community economic development and workforce development benefits in California, including the development and preservation of a skilled and trained construction workforce to carry out projects, long-term apprenticeship and job creation, and the development of a next-generation geothermal energy supply chain.
(i)California launched the global revolution in conventional geothermal technologies in the 20th century. It has the geologic resources, workforce, and clean energy economy to do so again in the 21st century if decisive state action is taken today. The National Renewable Energy Laboratory estimates that there could be 27.9 gigawatts of development of next-generation geothermal resources in California by 2050over double that of any other state.
(j)Aligning state law with forward-thinking federal policy on geothermal exploration is a critical component of building a strong geothermal energy economy in California.
SEC. 2.Section 21065.5 of the Public Resources Code is amended to read:21065.5.Geothermal exploratory project means a project as defined in Section 21065 composed of not more than six wells and associated drilling and testing equipment, including equipment and activities necessary to establish interconnectivity between wells and reservoirs, roads, electric distribution lines, and infrastructure to provide power for drilling and testing equipment, whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources prior to before commencement of a geothermal field development project as defined in Section 65928.5 of the Government Code.
SEC. 3.Section 21080.67 is added to the Public Resources Code, to read:21080.67.(a)This division does not apply to a geothermal exploratory project, as defined in Section 21065.5, for which a county is the lead agency pursuant to Section 3715.5, including any permit, funding, or other approval by a state or local agency for the geothermal exploratory project as may be required by this division, if the lead agency determines that the geothermal exploratory project meets all of the following conditions:
(1)The project does not include the production of geothermal resources in commercial quantities.
(2)Any well pads associated with the The project do not collectively does not disturb more than five 20 acres of previously undisturbed ground.
(3)The projects footprint does not include any of the following:
(A)Wetlands.
(B)Rivers, streams, or riparian corridors, except temporary road or electric distribution line crossings.
(C)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), a habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(D)Critical Identified habitat for species of special status identified by state or federal agencies, including fully protected species designated by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(E)Lands with a conservation easement unless determined consistent with the terms or requirements of the easement.
(4)Unusual circumstances do not exist that would cause the project to have a significant impact on the environment.
(5)The project is not located on a site that is included on any list compiled pursuant to Section 65962.5 of the Government Code.
(6)The project will not cause a substantial adverse change in the significance of a historical resource or a tribal cultural resource.
(7)The project includes full reclamation of all well pads, temporary routes, and other disturbances, including the reestablishment of vegetative cover with native plants, unless those disturbances are incorporated into a subsequent geothermal field development project, as defined in Section 65928.5 of the Government Code.
(b)This division does not apply to geothermal exploratory project undertaken by a private entity that satisfies the requirements of subdivision (a), if the(8)The project applicant certifies has certified to the lead agency that either of the following is true:
(1)(A)The entirety of the geothermal exploratory project is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(2)(B)If the geothermal exploratory project is not in its entirety a public work, all construction workers employed in the execution of the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the geothermal exploratory project is subject to this paragraph, subparagraph, then, for those portions of the project that are not a public work, both of the following shall apply:
(A)(i)The project applicant shall ensure that the prevailing wage requirement is included in all contracts for the performance of the work.
(B)(ii)All contractors and subcontractors shall pay to all construction workers employed in the execution of the work at least the general prevailing rate of per diem wages, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.
(c)(b)At least 30 days before making a determination to approve or carry out a change in use pursuant to this section, the lead agency shall post a written notice of the intent to apply the exemption on its internet website and at the project site.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)On October 22, 2024, the United States Department of the Interior, under the leadership of President Joseph Biden and Secretary of the Interior Deb Haaland, introduced a new categorical exclusion from the National Environmental Policy Act for geothermal resource confirmation activities, also known as geothermal exploratory projects, on federal lands.
(b)This exclusion reflects a recognition that geothermal exploratory projects are temporary activities that, when meeting a high standard of environmental care and stewardship, should result in no permanent negative impacts on the environment.
(c)Geothermal exploration is the necessary first phase of developing new geothermal energy resources, including next-generation geothermal energy resources like advanced closed-loop and enhanced geothermal systems. California markets feature a very high demand for geothermal energy, in part driven by Public Utilities Commission decisions 21-06-035 (June 24, 2021), Decision Requiring Procurement to Address Mid-Term Reliability (2023-2026), and 24-08-064 (August 22, 2024), Decision Determining Need for Centralized Procurement of Long Lead-Time Resources, which directed Californias load-serving entities and the Department of Water Resources to procure significant amounts of new geothermal energy over the years to come.
(d)The resource portfolios identified by the Public Utilities Commission to meet state climate goals are increasingly relying on out-of-state next-generation geothermal energy development, which both put Californias climate goals at risk and establishes an unnecessary but permanent export of wealth by California ratepayers.
(e)The first commercial-scale next-generation geothermal energy resources are currently under development in Nevada and Utah due to those states favorable regulatory environments, but nearly all of that energy is anticipated to be sold to buyers in California.
(f)Over 80 percent of Nevada and over 60 percent of Utah are federal lands where the categorical exclusion will apply, as compared to less than half of land in California. This has the potential to exacerbate the perceived favorability of those states regulatory environments and drive more development aimed at supplying the California market out of California.
(g)California must take an active role in ensuring that new geothermal energy projects built to supply the California market lead to investment and job creation in California and do not lead to the export of investment, industry knowledge, and the California geothermal, oil, and gas workforce to neighboring states.
(h)Next-generation geothermal energy development presents a significant opportunity to attract investment capital and realize community economic development and workforce development benefits in California, including the development and preservation of a skilled and trained construction workforce to carry out projects, long-term apprenticeship and job creation, and the development of a next-generation geothermal energy supply chain.
(i)California launched the global revolution in conventional geothermal technologies in the 20th century. It has the geologic resources, workforce, and clean energy economy to do so again in the 21st century if decisive state action is taken today. The National Renewable Energy Laboratory estimates that there could be 27.9 gigawatts of development of next-generation geothermal resources in California by 2050over double that of any other state.
(j)Aligning state law with forward-thinking federal policy on geothermal exploration is a critical component of building a strong geothermal energy economy in California.
SEC. 2.Section 21065.5 of the Public Resources Code is amended to read:21065.5.Geothermal exploratory project means a project as defined in Section 21065 composed of not more than six wells and associated drilling and testing equipment, including equipment and activities necessary to establish interconnectivity between wells and reservoirs, roads, electric distribution lines, and infrastructure to provide power for drilling and testing equipment, whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources prior to commencement of a geothermal field development project as defined in Section 65928.5 of the Government Code. Wells included within a geothermal exploratory project must be located at least one-half mile from geothermal development wells which are capable of producing geothermal resources in commercial quantities.
SEC. 2.Section 3715.6 is added to the Public Resources Code, to read:3715.6.(a)ASEC. 3.Section 21080.67 is added to the Public Resources Code, to read:21080.67.(a)This division does not apply to a geothermal exploratory project, as defined in Section 21065.5, that the lead agency determines meets the criteria of the categorical exclusion described in pages 84380 to 84383, inclusive, of Volume 89, Number 204 of the Federal Register (89 FR 84380) published on October, 22, 2024, shall be conclusively presumed to have satisfied the requirements of Division 13 (commencing with Section 21000) for that geothermal exploratory project, including to support the issuance of including any permit, funding, or other approval by a state or local agency for the geothermal exploratory project. project as may be required by this division, if the lead agency determines that the geothermal exploratory project meets all of the following conditions:
(1)The project does not include the production of geothermal resources in commercial quantities.
(2)Any well pads associated with the project do not collectively disturb more than five acres of previously undisturbed ground.
(3)The projects footprint does not include any of the following:
(A)Wetlands.
(B)Rivers, streams, or riparian corridors, except temporary road or electric distribution line crossings.
(C)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), a habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(D)Critical habitat for species of special status identified by state or federal agencies, including fully protected species designated by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(E)Lands with a conservation easement unless determined consistent with the terms or requirements of the easement.
(4)Unusual circumstances do not exist that would cause the project to have a significant impact on the environment.
(5)The project is not located on a site that is included on any list compiled pursuant to Section 65962.5 of the Government Code.
(6)The project will not cause a substantial adverse change in the significance of a historical resource or a tribal cultural resource.
(7)The project includes full reclamation of all well pads, temporary routes, and other disturbances, including the reestablishment of vegetative cover with native plants, unless those disturbances are incorporated into a subsequent geothermal field development project, as defined in Section 65928.5 of the Government Code.
(b)For a This division does not apply to geothermal exploratory project undertaken by a private entity that satisfies the requirements of Division 13 (commencing with Section 21000) pursuant to subdivision (a), if the project applicant shall certify certifies to the lead agency that either of the following is true:
(1)The entirety of the geothermal exploratory project is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(2)If the geothermal exploratory project is not in its entirety a public work, all construction workers employed in the execution of the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the geothermal exploratory project is subject to this paragraph, then, for those portions of the project that are not a public work, both of the following shall apply:
(A)The project applicant shall ensure that the prevailing wage requirement is included in all contracts for the performance of the work.
(B)All contractors and subcontractors shall pay to all construction workers employed in the execution of the work at least the general prevailing rate of per diem wages, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.
(c)At least 30 days before making a determination to approve or carry out a change in use pursuant to this section, the lead agency shall post a written notice of the intent to apply the exemption on its internet website and at the project site.
The Legislature finds and declares all of the following:
(a)On October 22, 2024, the United States Department of the Interior, under the leadership of President Joseph Biden and Secretary of the Interior Deb Haaland, introduced a new categorical exclusion from the National Environmental Policy Act for geothermal resource confirmation activities, also known as geothermal exploratory projects, on federal lands.
(b)This exclusion reflects a recognition that geothermal exploratory projects are temporary activities that, when meeting a high standard of environmental care and stewardship, should result in no permanent negative impacts on the environment.
(c)Geothermal exploration is the necessary first phase of developing new geothermal energy resources, including next-generation geothermal energy resources like advanced closed-loop and enhanced geothermal systems. California markets feature a very high demand for geothermal energy, in part driven by Public Utilities Commission decisions 21-06-035 (June 24, 2021), Decision Requiring Procurement to Address Mid-Term Reliability (2023-2026), and 24-08-064 (August 22, 2024), Decision Determining Need for Centralized Procurement of Long Lead-Time Resources, which directed Californias load-serving entities and the Department of Water Resources to procure significant amounts of new geothermal energy over the years to come.
(d)The resource portfolios identified by the Public Utilities Commission to meet state climate goals are increasingly relying on out-of-state next-generation geothermal energy development, which both put Californias climate goals at risk and establishes an unnecessary but permanent export of wealth by California ratepayers.
(e)The first commercial-scale next-generation geothermal energy resources are currently under development in Nevada and Utah due to those states favorable regulatory environments, but nearly all of that energy is anticipated to be sold to buyers in California.
(f)Over 80 percent of Nevada and over 60 percent of Utah are federal lands where the categorical exclusion will apply, as compared to less than half of land in California. This has the potential to exacerbate the perceived favorability of those states regulatory environments and drive more development aimed at supplying the California market out of California.
(g)California must take an active role in ensuring that new geothermal energy projects built to supply the California market lead to investment and job creation in California and do not lead to the export of investment, industry knowledge, and the California geothermal, oil, and gas workforce to neighboring states.
(h)Next-generation geothermal energy development presents a significant opportunity to attract investment capital and realize community economic development and workforce development benefits in California, including the development and preservation of a skilled and trained construction workforce to carry out projects, long-term apprenticeship and job creation, and the development of a next-generation geothermal energy supply chain.
(i)California launched the global revolution in conventional geothermal technologies in the 20th century. It has the geologic resources, workforce, and clean energy economy to do so again in the 21st century if decisive state action is taken today. The National Renewable Energy Laboratory estimates that there could be 27.9 gigawatts of development of next-generation geothermal resources in California by 2050over double that of any other state.
(j)Aligning state law with forward-thinking federal policy on geothermal exploration is a critical component of building a strong geothermal energy economy in California.
SEC. 2.Section 3715.6 is added to the Public Resources Code, to read:3715.6.(a)A geothermal exploratory project, as defined in Section 21065.5, that the lead agency determines meets the criteria of the categorical exclusion described in pages 84380 to 84383, inclusive, of Volume 89, Number 204 of the Federal Register (89 FR 84380) published on October, 22, 2024, shall be conclusively presumed to have satisfied the requirements of Division 13 (commencing with Section 21000) for that geothermal exploratory project, including to support the issuance of any permit, funding, or other approval by a state or local agency for the geothermal exploratory project.
(b)For a geothermal exploratory project undertaken by a private entity that satisfies the requirements of Division 13 (commencing with Section 21000) pursuant to subdivision (a), the project applicant shall certify to the lead agency that either of the following is true:
(1)The entirety of the geothermal exploratory project is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(2)If the geothermal exploratory project is not in its entirety a public work, all construction workers employed in the execution of the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the geothermal exploratory project is subject to this paragraph, then, for those portions of the project that are not a public work, both of the following shall apply:
(A)The project applicant shall ensure that the prevailing wage requirement is included in all contracts for the performance of the work.
(B)All contractors and subcontractors shall pay to all construction workers employed in the execution of the work at least the general prevailing rate of per diem wages, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.
|
Date
|
Status
|
|---|---|
| Jan 22, 2026 | Consideration of Governor's veto stricken from file. |
| Oct 6, 2025 | Consideration of Governor's veto pending. |
| Oct 6, 2025 | Vetoed by Governor. |
| Sep 22, 2025 | Enrolled and presented to the Governor at 3 p.m. |
| Sep 10, 2025 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 79. Noes 0. Page 3196.). |
| Sep 9, 2025 | In Assembly. Concurrence in Senate amendments pending. |
| Sep 9, 2025 | Read third time. Passed. Ordered to the Assembly. (Ayes 36. Noes 0. Page 2739.). |
| Sep 8, 2025 | Read second time. Ordered to third reading. |
| Sep 5, 2025 | Read third time and amended. Ordered to second reading. |
| Aug 29, 2025 | Read second time. Ordered to third reading. |
| Aug 29, 2025 | From committee: Do pass. (Ayes 7. Noes 0.) (August 29). |
| Aug 18, 2025 | In committee: Referred to suspense file. |
| Jul 23, 2025 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 23, 2025 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 7. Noes 0.) (July 16). |
| Jul 7, 2025 | Read second time and amended. Re-referred to Com. on N.R. & W. |
| Jul 3, 2025 | From committee: Amend, and do pass as amended and re-refer to Com. on N.R. & W. (Ayes 6. Noes 1.) (July 2). |
| Jun 24, 2025 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on E.Q. |
| Jun 4, 2025 | Referred to Coms. on E.Q. and N.R. & W. |
| May 28, 2025 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 27, 2025 | Read third time. Passed. Ordered to the Senate. (Ayes 76. Noes 0. Page 1729.) |
| May 15, 2025 | Read second time. Ordered to third reading. |
| May 14, 2025 | From committee: Do pass. (Ayes 15. Noes 0.) (May 14). |
| May 6, 2025 | Re-referred to Com. on APPR. |
| May 5, 2025 | Read second time and amended. |
| May 1, 2025 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 14. Noes 0.) (April 28). |
| Apr 22, 2025 | Re-referred to Com. on NAT. RES. |
| Apr 21, 2025 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| Apr 21, 2025 | In committee: Hearing postponed by committee. |
| Apr 21, 2025 | Re-referred to Com. on NAT. RES. |
| Apr 10, 2025 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| Mar 3, 2025 | Referred to Com. on NAT. RES. |
| Feb 11, 2025 | From printer. May be heard in committee March 13. |
| Feb 10, 2025 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 10, 2025 | AB 527 Papan Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Sep 9, 2025 | Assembly 3rd Reading AB527 Papan et al. By Limón | Senate Floor |
Passed |
|
| Aug 29, 2025 | Do pass | Senate Standing Committee on Appropriations |
Passed |
|
| Aug 18, 2025 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jul 16, 2025 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Natural Resources and Water |
Passed |
|
| Jul 2, 2025 | Do pass as amended, but first amend, and re-refer to the Committee on [Natural Resources and Water] | Senate Standing Committee on Environmental Quality |
Passed |
|
| May 27, 2025 | AB 527 Papan Assembly Third Reading | Assembly Floor |
Passed |
|
| May 14, 2025 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 28, 2025 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Associated Builders And Contractors Of California | ** Against | |
| California Community Choice Association | ** Support | |
| California Native Plant Society | ** Against | |
| California State Association Of Electrical Workers | ** Support | |
| California State Pipe Trades Council | ** Support | |
| Center For Biological Diversity | ** Against | |
| Citizens’ Climate Lobby Santa Rosa and North | ** Support | |
| City of Cloverdale | ** Support | |
| County of Sonoma | ** Support | |
| Defenders Of Wildlife | ** Against | |
| Eavor | ** Support | |
| Eavor, Inc. | ** Support | |
| Fervo Energy | ** Support | |
| Geothermal Rising | ** Support | |
| International Union of Operating Engineers, Cal-Nevada Conference | ** Support | |
| Mount Shasta Bioregional Ecology Center | ** Against | |
| Northern Sonoma County Air Pollution Control District | ** Support | |
| ormat technologies | ** Support | |
| Planning And Conservation League | ** Against | |
| San Jose Clean Energy | ** Support | |
| Solano County Democratic Central Committee | ** Support | |
| Sonoma Clean Energy | ** Support | |
| Sonoma Clean Power | ** Support | |
| USGBC California | ** Support | |
| Western States Council Sheet Metal, Air, Rail And Transportation | ** Support | |
| Xgs Energy | ** Support |
GOVERNOR'S VETO
GV Bill Id:AB 527
Author:(Papan)
As Enrolled Ver:September 12, 2025
2/3 vote
SUMMARY
Establishes an exemption from the California Environmental Quality Act (CEQA) for geothermal exploratory projects, if specified conditions are met, including full reclamation of the project site.
Senate Amendments
- Require the well log for an enhanced geothermal exploratory project exempted by the bill to include the chemical and physical characteristics, and amounts, of well stimulation fluids.
- Require the Division of Geologic Energy Management (CalGEM) to promulgate regulations, as specified, for enhanced geothermal system wells by January 1, 2029.
- Prior to these CalGEM regulations, require the well operator to provide specified information to the CalGEM Supervisor.
- Revise the definition of "geothermal exploratory project" to require, with specified exceptions, wells to be located at least one-half mile from commercial geothermal development wells.
- Add exclusions for sites on or near sites on the "Cortese List," identified habitat, conservation easements, wetlands, roads, public buildings, and adjacent properties.
- Require the lead agency to determine the project will not result in significant adverse impacts to natural resources, hydrological resources, tribal, historical, and other cultural resources, as well as that unusual circumstances do not exist that would cause the project to have a significant adverse impact on the environment.
- Require the project applicant to provide to the lead agency a legally binding commitment to comply with specified labor standards.
- Require the project developer to conduct a reconnaissance survey, as specified, to identify potential environmental impacts.
- Require the lead agency to consult with a California Native American tribe that is traditionally and culturally affiliated with the project area in order to determine if the project will result in significant adverse impacts to a tribal cultural resource.
- Require a geothermal field development project located on a site where a geothermal exploratory project was deployed using this bill's exemption to use a baseline for CEQA review that reflects the site before the geothermal exploratory project.
Governor's Veto Message
This bill would create a California Environmental Quality Act (CEQA) exemption through 2030 for qualifying geothermal exploratory projects when a county or the Department of Conservation's California Geologic Energy Management Division (Division) is the lead agency, if those projects meet specified requirements.
This bill also would require the Division to combine new regulations for "enhanced geothermal systems" (EGS) wells with a current geothermal rulemaking by January 1, 2029, and, until those regulations are in effect, operators would be required to provide specified technical information when filing a drilling Notice of Intention for EGS wells in CEQA-exempt projects.
In addition to delaying much-needed regulations that are already in process, the Division would need to substantially increase fees on geothermal operators to implement the new requirements imposed by the bill. While I support the expansion of the geothermal energy industry in California as a much-needed source of baseload clean power, the increased fees caused by this bill could disincentivize geothermal development in California beyond any incentive provided by a CEQA exemption for one part of a project's permitting process.
Additionally, I signed Assembly Bill 1359 (Papan) last year, which made a series of targeted reforms to the review and approval of geothermal exploration projects. It is prudent that we understand the effects of these changes before granting wholesale CEQA exemptions with costly and complicated conditions.
COMMENTS
Geothermal is a form of renewable energy defined as heat energy from the earth. Geothermal resources are reservoirs of hot water that are naturally occurring or are manufactured to operate at varying temperatures and depths below the earth's surface. Wells, ranging from a few feet to several miles deep, can be drilled into underground reservoirs to tap steam and hot water that can be brought to the surface for use in electricity generation, direct heating, and industrial processes. The United States is the world's largest producer of geothermal electricity and California has the highest geothermal capacity of all states. "The Geysers" geothermal steam field, located within Lake, Mendocino, and Sonoma Counties, contains 349 out of California's 563 high-temperature geothermal wells within the state. Imperial County (including the Salton Sea) houses 194 of these wells, and the remaining 20 are located in Lassen, Modoc, and Mono Counties. California has installed 2,627 MW of geothermal nameplate capacity – accounting for 72% of the total geothermal plant capacity in the United States. Many of these geothermal resource areas are known to have been inhabited and visited by Native Americans for thousands of years prior to European settlement.
Under current law, a geothermal project is divided into two discrete components for purposes of CEQA. The "exploration" phase involves drilling one or more exploration wells at a given site to map out the subsurface environment and assess exactly where a new geothermal power plant should be located. The subsequent "geothermal field development" phase involves drilling the necessary injector and producer wells, building the power plant, grid connections, and associated infrastructure. This phase is much more complicated and expansive. Typically, a geothermal developer cannot move forward with geothermal field development until some level of exploration has taken place as they need to site the wells in precisely the right location to make sure they are getting enough heat to support power generation, and that information can only be ascertained through exploration.
In 2024, the U.S. Department of Interior adopted add a new categorical exclusion from the National Environmental Policy Act (NEPA) for geothermal resource confirmation activities on federal geothermal resource leases. According to the author, the new categorical exclusion was based on the Bureau of Land Management's (BLM) assessment that geothermal exploration projects, when completed under a high-bar environmental standard, have virtually no negative impacts to the environment.
This NEPA exclusion was adopted for use by BLM for projects on federal lands nationwide. Recent geothermal projects in Nevada and Utah are located on vast expanses of desert managed by BLM, with little potential for land use or environmental conflicts. BLM arrived at a 20 acre limit on total surface disturbance by looking back at the statistical details of 26 prior projects. Those 26 projects varied widely in well pad size and total disturbance, with 20 acres being the approximate median. The projects ranged from .08 acres (in New Mexico) to 143 acres (in Nevada). The 20-acre limit does not appear to be based on any particular environmental criteria and is not tailored to project or site characteristics.
In California, the geothermal resource potential is not necessarily on federal land, and exploratory and development projects are not necessarily subject to NEPA. Nonetheless, the CEQA exemption in this bill applies regardless of whether the project is on federal land or otherwise subject to NEPA review. Of the 26 projects examined by BLM, three were in California (two in Inyo County and one in Imperial County). One of the three was on federal land (Inyo National Forest near Mammoth Lakes), and all were under 20 acres.
According to the Author
AB 527 will accelerate the development of geothermal resources and advance California's climate goals by expediting exploratory well projects which have a de minimis impact. In order to gather essential subsurface data to determine the viability of a potential geothermal field, developers must drill exploratory wells. Currently, this exploratory endeavor is treated as a separate project, subject to its own environmental review process. The federal government has previously allowed latitude concerning exploratory wells. In October 2024, the Biden Administration proposed a categorical exclusion under NEPA for these de minimis exploration projects. AB 527 seeks to align California's approach with this federal exclusion, allowing carefully vetted exploratory geothermal projects to be exempt from CEQA. This alignment will eliminate redundant regulatory hurdles, ensuring projects move forward more quickly and efficiently bringing us that much closer to our renewable energy goals.
Arguments in Support
According to co-sponsor Fervo Energy, categorical exclusions for exploratory drilling projects that meet a high standard of environmental stewardship are critical to attracting geothermal developers to California. Developers must fully understand a site's subsurface characteristics to attract financing for a full and capital-intensive geothermal project. California's unique process largely precludes it from developer consideration, as it does not offer the same certainties in timeline and cost that other states can afford. By lowering barriers for developers to confirm their resources and initiate project financing, this bill would greatly improve the chances of attracting geothermal energy developers such as Fervo.
Arguments in Opposition
According to Defenders of Wildlife and other environmental organizations, this bill is unnecessary – while the background document mentions "perceived regulatory challenges" and discusses the competitive advantage that may shift siting to other states, there is no detailed information about any actual regulatory roadblocks to permitting geothermal exploration in California. In our experience, many of these projects go through lead agency review at the county level in a timely manner and with few challenges. Complying with California's robust environmental laws is critical to preserving our resources while developing energy projects.
FISCAL COMMENTS
According to the Senate Appropriations Committee, the Department of Conservation (DOC) estimates one-time costs of $3.28 million in year one for internal infrastructure development and ongoing costs of about $432,000 annually for two positions (the Oil, Gas, and Geothermal Administrative Fund [OGGA]) to implement the provisions of this bill, including developing and applying specialized expertise in enhanced geothermal systems; leading collaborative efforts with similarly focused agencies from other states; reviewing and permitting of advanced geothermal wells differentiated from enhanced geothermal system wells where additional methods other than hydraulic fracturing is proposed; reviewing seismic monitoring plans; reviewing disclosures of anticipated composition and disposition of well stimulation fluids; technical support for regulatory development; and administrative support. CalGEM notes OGGA is partially funded by fees assessed on geothermal operators. In the absence of an identified funding source, to fund the work required in this bill, CalGEM would need to assess fees on geothermal operators.
VOTES
ASM NATURAL RESOURCES: 14-0-0
YES: Bryan, Alanis, Connolly, Ellis, Flora, Garcia, Haney, Hoover, Kalra, Muratsuchi, Pellerin, Schultz, Wicks, Zbur
ASM APPROPRIATIONS: 15-0-0
YES: Wicks, Sanchez, Arambula, Calderon, Caloza, Dixon, Elhawary, Fong, Mark González, Hart, Pacheco, Pellerin, Solache, Ta, Tangipa
ASSEMBLY FLOOR: 76-0-3
YES: Addis, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Castillo, Chen, Connolly, Davies, DeMaio, Dixon, Elhawary, Ellis, Flora, Fong, Gabriel, Gallagher, Garcia, Gipson, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Muratsuchi, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Sanchez, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ta, Tangipa, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
ABS, ABST OR NV: Aguiar-Curry, Jeff Gonzalez, Nguyen
SENATE FLOOR: 36-0-4
YES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Niello, Ochoa Bogh, Padilla, Pérez, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Weber Pierson, Wiener
ABS, ABST OR NV: Menjivar, Reyes, Valladares, Wahab
ASSEMBLY FLOOR: 79-0-1
YES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Castillo, Chen, Connolly, Davies, DeMaio, Dixon, Elhawary, Ellis, Flora, Fong, Gabriel, Gallagher, Garcia, Gipson, Jeff Gonzalez, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Johnson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Sanchez, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ta, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
ABS, ABST OR NV: Tangipa
UPDATED
VERSION: September 12, 2025
CONSULTANT: Lawrence Lingbloom / NAT. RES. / (916)-319-2092 FN: 0002175
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 527
Author:(Papan)
As Amended Ver:September 5, 2025
Majority vote
SUMMARY
Establishes an exemption from the California Environmental Quality Act (CEQA) for geothermal exploratory projects, if specified conditions are met, including full reclamation of the project site.
Senate Amendments
- Require the well log for an enhanced geothermal exploratory project exempted by the bill to include the chemical and physical characteristics, and amounts, of well stimulation fluids.
- Require the Division of Geologic Energy Management (CalGEM) to promulgate regulations, as specified, for enhanced geothermal system wells by January 1, 2029.
- Prior to these CalGEM regulations, require the well operator to provide specified information to the CalGEM Supervisor.
- Revise the definition of “geothermal exploratory project” to require, with specified exceptions, wells to be located at least one-half mile from commercial geothermal development wells.
- Add exclusions for sites on or near sites the “Cortese List,” identified habitat, conservation easements, wetlands, roads, public buildings, and adjacent properties.
- Require the lead agency to determine the project will not result in significant adverse impacts to natural resources, hydrological resources, tribal, historical, and other cultural resources, as well as that unusual circumstances do not exist that would cause the project to have a significant adverse impact on the environment.
- Require the project applicant to provide to the lead agency a legally binding commitment to comply with specified labor standards.
- Require the project developer to conduct a reconnaissance survey, as specified, to identify potential environmental impacts.
- Requires the lead agency to consult with a California Native American tribe that is traditionally and culturally affiliated with the project area in order to determine if the project will result in significant adverse impacts to a tribal cultural resource.
- Requires a geothermal field development project located on a site where a geothermal exploratory project was deployed using this bill’s exemption to use a baseline for CEQA review that reflects the site before the geothermal exploratory project.
COMMENTS
Geothermal is a form of renewable energy defined as heat energy from the earth. Geothermal resources are reservoirs of hot water that are naturally occurring or are manufactured to operate at varying temperatures and depths below the earth’s surface. Wells, ranging from a few feet to several miles deep, can be drilled into underground reservoirs to tap steam and hot water that can be brought to the surface for use in electricity generation, direct heating, and industrial processes. The United States is the world’s largest producer of geothermal electricity and California has the highest geothermal capacity of all states. “The Geysers” geothermal steam field, located within Lake, Mendocino, and Sonoma Counties, contains 349 out of California’s 563 high-temperature geothermal wells within the state. Imperial County (including the Salton Sea) houses 194 of these wells, and the remaining 20 are located in Lassen, Modoc, and Mono Counties. California has installed 2,627 MW of geothermal nameplate capacity – accounting for 72% of the total geothermal plant capacity in the United States. Many of these geothermal resource areas are known to have been inhabited and visited by Native Americans for thousands of years prior to European settlement.
Under current law, a geothermal project is divided into two discrete components for purposes of CEQA. The “exploration” phase involves drilling one or more exploration wells at a given site to map out the subsurface environment and assess exactly where a new geothermal power plant should be located. The subsequent “geothermal field development” phase involves drilling the necessary injector and producer wells, building the power plant, grid connections, and associated infrastructure. This phase is much more complicated and expansive. Typically, a geothermal developer cannot move forward with geothermal field development until some level of exploration has taken place as they need to site the wells in precisely the right location to make sure they are getting enough heat to support power generation, and that information can only be ascertained through exploration.
In 2024, the U.S. Department of Interior adopted add a new categorical exclusion from the National Environmental Policy Act (NEPA) for geothermal resource confirmation activities on federal geothermal resource leases. According to the author, the new categorical exclusion was based on the Bureau of Land Management’s (BLM) assessment that geothermal exploration projects, when completed under a high-bar environmental standard, have virtually no negative impacts to the environment.
This NEPA exclusion was adopted for use by BLM for projects on federal lands nationwide. Recent geothermal projects in Nevada and Utah are located on vast expanses of desert managed by BLM, with little potential for land use or environmental conflicts. BLM arrived at a 20 acre limit on total surface disturbance by looking back at the statistical details of 26 prior projects. Those 26 projects varied widely in well pad size and total disturbance, with 20 acres being the approximate median. The projects ranged from .08 acres (in New Mexico) to 143 acres (in Nevada). The 20-acre limit does not appear to be based on any particular environmental criteria and is not tailored to project or site characteristics.
In California, the geothermal resource potential is not necessarily on federal land, and exploratory and development projects are not necessarily subject to NEPA. Nonetheless, the CEQA exemption in this bill applies regardless of whether the project is on federal land or otherwise subject to NEPA review. Of the 26 projects examined by BLM, three were in California (two in Inyo County and one in Imperial County). One of the three was on federal land (Inyo National Forest near Mammoth Lakes), and all were under 20 acres.
According to the Author
AB 527 will accelerate the development of geothermal resources and advance California's climate goals by expediting exploratory well projects which have a de minimis impact. In order to gather essential subsurface data to determine the viability of a potential geothermal field, developers must drill exploratory wells. Currently, this exploratory endeavor is treated as a separate project, subject to its own environmental review process. The federal government has previously allowed latitude concerning exploratory wells. In October 2024, the Biden Administration proposed a categorical exclusion under NEPA for these de minimis exploration projects. AB 527 seeks to align California’s approach with this federal exclusion, allowing carefully vetted exploratory geothermal projects to be exempt from CEQA. This alignment will eliminate redundant regulatory hurdles, ensuring projects move forward more quickly and efficiently bringing us that much closer to our renewable energy goals.
Arguments in Support
According to co-sponsor Fervo Energy, categorical exclusions for exploratory drilling projects that meet a high standard of environmental stewardship are critical to attracting geothermal developers to California. Developers must fully understand a site’s subsurface characteristics to attract financing for a full and capital-intensive geothermal project. California’s unique process largely precludes it from developer consideration, as it does not offer the same certainties in timeline and cost that other states can afford. By lowering barriers for developers to confirm their resources and initiate project financing, this bill would greatly improve the chances of attracting geothermal energy developers such as Fervo.
Arguments in Opposition
According to Defenders of Wildlife and other environmental organizations, this bill is unnecessary – while the background document mentions “perceived regulatory challenges” and discusses the competitive advantage that may shift siting to other states, there is no detailed information about any actual regulatory roadblocks to permitting geothermal exploration in California. In our experience, many of these projects go through lead agency review at the county level in a timely manner and with few challenges. Complying with California’s robust environmental laws is critical to preserving our resources while developing energy projects.
FISCAL COMMENTS
According to the Senate Appropriations Committee, the Department of Conservation (DOC) estimates one-time costs of $3.28 million in year one for internal infrastructure development and ongoing costs of about $432,000 annually for two positions (the Oil, Gas, and Geothermal Administrative Fund [OGGA]) to implement the provisions of this bill, including developing and applying specialized expertise in enhanced geothermal systems; leading collaborative efforts with similarly focused agencies from other states; reviewing and permitting of advanced geothermal wells differentiated from enhanced geothermal system wells where additional methods other than hydraulic fracturing is proposed; reviewing seismic monitoring plans; reviewing disclosures of anticipated composition and disposition of well stimulation fluids; technical support for regulatory development; and administrative support. CalGEM notes OGGA is partially funded by fees assessed on geothermal operators. In the absence of an identified funding source, to fund the work required in this bill, CalGEM would need to assess fees on geothermal operators.
VOTES:
ASM NATURAL RESOURCES: 14-0-0
YES: Bryan, Alanis, Connolly, Ellis, Flora, Garcia, Haney, Hoover, Kalra, Muratsuchi, Pellerin, Schultz, Wicks, Zbur
ASM APPROPRIATIONS: 15-0-0
YES: Wicks, Sanchez, Arambula, Calderon, Caloza, Dixon, Elhawary, Fong, Mark González, Hart, Pacheco, Pellerin, Solache, Ta, Tangipa
ASSEMBLY FLOOR: 76-0-3
YES: Addis, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Castillo, Chen, Connolly, Davies, DeMaio, Dixon, Elhawary, Ellis, Flora, Fong, Gabriel, Gallagher, Garcia, Gipson, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Muratsuchi, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Sanchez, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ta, Tangipa, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
ABS, ABST OR NV: Aguiar-Curry, Jeff Gonzalez, Nguyen
UPDATED
VERSION: September 5, 2025
CONSULTANT: Lawrence Lingbloom / NAT. RES. / (916) 319-2092 FN: 0001986
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 527 |
THIRD READING
Bill No: AB 527
Author: Papan (D), et al.
Amended: 9/5/25 in Senate
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 6-1, 7/2/25
AYES: Blakespear, Valladares, Dahle, Gonzalez, Hurtado, Padilla
NOES: Pérez
NO VOTE RECORDED: Menjivar
SENATE NATURAL RES. & WATER COMMITTEE: 7-0, 7/16/25
AYES: Limón, Seyarto, Allen, Grove, Hurtado, Laird, Stern
SENATE APPROPRIATIONS COMMITTEE: 7-0, 8/29/25
AYES: Caballero, Seyarto, Cabaldon, Dahle, Grayson, Richardson, Wahab
ASSEMBLY FLOOR: 76-0, 5/27/25 - See last page for vote
SUBJECT: California Environmental Quality Act: geothermal exploratory projects: geothermal field development projects: enhanced geothermal system wells
SOURCE: Sonoma Clean Power
DIGEST:
This bill provides an exemption from the California Environmental Quality Act (CEQA) for geothermal exploratory projects that meet certain criteria, as provided, and requires the Geological Energy Management Division (CalGEM) to update their regulations regarding geothermal projects.
Senate Floor Amendments of 9/5/25 add a tribal consultation process in addition to several other changes related to eligibility criteria for the CEQA exemption for geothermal exploratory wells and additional clarifying and technical changes.
ANALYSIS:
Existing law:
- The California Environmental Quality Act (CEQA) requires a lead agency to spearhead an environmental impact report (EIR) for a project that may have a significant effect on the environment. CEQA also requires a lead agency to prepare a negative declaration (ND) for a project that will have no significant effects on the environment, or a mitigated negative declaration (MND) for projects that have no significant effects after mitigation. (Public Resources Code (PRC) §§ 21000 et seq.)
- Defines “geothermal exploratory project” as a project composed of not more than six wells and associated drilling and testing equipment, whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources prior to commencement of a geothermal field development. Wells included within a geothermal exploratory project must be located at least one-half mile from geothermal development wells which are capable of producing geothermal resources in commercial quantities. (PRC 21065.5)
- Specifies that the Geological Energy Management Division (CalGEM) shall be the default lead agency under CEQA for geothermal exploratory projects, but that CalGEM can delegate its lead agency responsibility to a county that has adopted a geothermal element as part of its general plan.
- Defines “geothermal field development project” as a development project composed of geothermal wells, resource transportation lines, production equipment, roads, and other facilities which are necessary to supply geothermal energy to any particular heat utilization equipment for its productive life, all within an area delineated by the applicant. (Government Code 65928.5)
- Establishes CalGEM within the Department of Conservation as the state’s geothermal well regulator. The State Oil and Gas Supervisor (supervisor) leads CalGEM.
- Proclaims that Californians have a direct and primary interest in the development of geothermal resources, and the state should exercise its power and jurisdiction to require that wells for the discovery and production of geothermal resources be drilled, operated, maintained and abandoned in such manner as to safeguard life, health, property, and the public welfare, and to encourage maximum economic recovery. (PRC) §3700)
- Requires the supervisor to so supervise the drilling, operation, maintenance and abandonment of geothermal resources wells as to encourage the greatest economic recovery of geothermal resources, to prevent damage to life, health, property, and natural resources, and to prevent damage to, and waste from, the underground geothermal deposits, and to prevent damage to underground and surface waters suitable for irrigation or domestic purposes by reason of the drilling, operation, maintenance, and abandonment of geothermal resources wells. (PRC §3714)
- Requires the supervisor to also supervise the drilling, operation, maintenance, and abandonment of wells so as to permit the owners or operators of such wells to utilize all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources, and to allow the operator to do what a prudent operator using reasonable diligence would do, as provided. (PRC §3715)
- Requires an owner or operator before drilling or re-drilling, abandoning or deepening or altering the casing of a well to file with the supervisor or CalGEM district deputy a written notice of intention to drill the well containing certain information and pay a fee. (PRC §3724)
This bill:
- Establishes a CEQA exemption for geothermal exploratory projects that meet certain criteria, as provided.
- Includes, expressly as part of a geothermal exploratory project, among other things, equipment and activities necessary to establish interconnectivity between wells and reservoirs.
- Excludes certain wells connecting to geothermal reservoirs from the one-half mile limit described above.
- Exempts, until January 1, 2031, from CEQA geothermal exploratory projects that meet specified conditions and for which the county is the lead agency. Before the lead agency determines that a geothermal exploratory project is exempt from CEQA, the bill would require a project developer to supply the lead agency with a survey that includes specified information.
- Authorizes the lead agency to require the project applicant to file an indemnity bond, as specified, before the lead agency determines that a geothermal exploratory project is exempt from CEQA.
- Requires the lead agency, at least 30 days before making a determination to approve or carry out a change in use pursuant to this exemption, to post a written notice on its internet website and at the project site.
- Requires the lead agency to post the entire project application on its internet website.
- Requires, if the lead agency determines that the project is exempt from CEQA, the lead agency to file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located, as provided, and to provide a copy of the notice to specified entities.
- Imposes a state-mandated local program because the exemption would apply to projects where the county is the lead agency and the county would be required to determine if a project qualifies for this exemption.
- Requires a geothermal field development project located on a site where a geothermal exploratory project was deployed pursuant to the above-described CEQA exemption to use a baseline for CEQA review that reflects the site before the geothermal exploratory project occurred.
- Requires, on or before January 1, 2029, the Geologic Energy Management Division to promulgate regulations for enhanced geothermal system wells, as provided. Before the promulgation and implementation of those regulations, the bill would require an operator to provide specified information to the supervisor when the operator files the notice of intent to commence drilling for a well in a CEQA-exempt geothermal exploratory project that employs enhanced geothermal system technology.
Background
- The a, b, c’s of CEQA. CEQA is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment. CEQA is enforced by civil lawsuits that can challenge the project’s environmental review. Under CEQA, projects (unless they have a specific exemption) must undergo environmental analysis. This process starts with an initial study which determines what level of further environmental review is needed for a given project. If a project has no significant effects on the environment, or if those effects can be fully mitigated, the project can move forward with a negative declaration (ND) or mitigated negative declaration (MND). If the initial study finds that the project has potentially significant effects on the environment, then the lead agency submits a notice of preparation (NOP) that they are going to conduct an EIR. An EIR provides a thorough environmental review of a proposed project. Under the law, projects have one year to complete an EIR, except in extenuating circumstances.
- Advanced geothermal systems. According to the U.S. Department of Energy (U.S. DOE), many more areas may be able to utilize geothermal resources through the use of advanced geothermal systems. These new systems may be able to utilize any area where there are relatively hot rocks – not just in the well-known high-temperature geothermal resource areas such as those in Imperial County. These new systems include Enhanced Geothermal Systems (EGS), which use three general types of well stimulation: thermal, hydraulic, and chemical stimulation. Thermal stimulation relies on the introduction of chilled water, and thus cold stress, to a geothermal reservoir. Hydraulic stimulation relies on the introduction of water or a combination of water and sand or water and gel-proppant fluids to a geothermal reservoir. Chemical well stimulation techniques involve the use of aqueous solutions to allow acids, bases, and chelating agents to be introduced into geothermal reservoirs. The U.S. DOE estimates these next generation geothermal systems can produce up to 90 gigawatts (GW) of renewable power by 2050, and up to 300 GW depending upon storage and other emerging technologies. The U.S. DOE estimates that the cost of this power should fall to $60 - $70 per megawatt-hours (MWh) by 2030. Because of its ability to provide clean, firm power, geothermal has some comparative advantages to solar and wind, however current estimates suggest that it is likely to remain a more expensive source of energy in the foreseeable future.
- CEQA streamlining for energy projects. The Legislature has taken several measures in recent years to streamline environmental review for clean energy projects. In 2023, the Legislature passed SB 149 (Caballero, Chapter 60, Statutes of 2023), which offered CEQA judicial streamlining for certain clean energy and infrastructure projects. The CEQA judicial streamlining caps the amount of time it takes for CEQA lawsuits to move through the courts to 270 days, with all appeals, as feasible.
In the 2022 budget, the Legislature established a new, opt-in environmental review certification program at the CEC that offered streamlined CEQA environmental review of just 270 days (“AB 205”). Under existing law, EIRs much be completed in one year, except in extenuating circumstances. AB 205 only applies to certain clean energy projects, including for solar photovoltaic, terrestrial wind, geothermal, and other non-fossil, non-nuclear power plants with a generating capacity of 50 megawatts (MW) or more, for energy storage systems capable of storing 200-megawatt hours or more of electricity, and for transmission lines from those facilities to a point of connection with an electrical transmission system. Before AB 205, the CEC’s siting authority was limited to thermal power plants with capacities of 50 MW or more.
Geothermal projects are eligible for both CEQA judicial and environmental streamlining established in SB 149 and AB 205, respectively, if the specific projects meet the eligibility criteria established in those laws.
Comments
- Purpose of Bill. According to the author, “AB 527 will accelerate the development of geothermal resources and advance California's climate goals by expediting exploratory well projects which have a de minimis impact on the environment. In order to gather essential subsurface data to determine the viability of a potential geothermal field, developers must drill exploratory wells. Currently, this exploratory endeavor is treated as a separate project, subject to its own environmental review process. The federal government has previously allowed latitude concerning exploratory wells. In October 2024, the Biden Administration created a new categorical exclusion under NEPA for these de minimis exploration projects. AB 527 seeks to align California’s approach with this federal exclusion, allowing carefully vetted exploratory geothermal projects to be exempt from CEQA. This alignment will eliminate redundant regulatory hurdles, ensuring projects move forward more quickly and efficiently bringing us that much closer to our renewable energy goals.”
- What happens if an exploration is successful? AB 527 only creates a CEQA exemption for exploratory geothermal projects. Exploratory geothermal projects are the necessary first step to determine if a site is appropriate for a full geothermal energy project. Those future full geothermal projects will then go through necessary environmental review under CEQA.
However, CEQA determines whether or not a project has significant impacts compared to the existing physical conditions in the project's vicinity when environmental review begins. If the baseline for environmental review is an existing wellpad, then the required mitigation measures are likely to be much less rigorous than if the baseline was a pristine desert environment. Because the size of the area that is eligible for CEQA exemptions under AB 527 is 12 acres, full energy generating geothermal operations could be deployed within the exploratory geothermal project site.
To ensure that an exploratory geothermal project’s exemption does not become, in effect, an exemption for an entire geothermal power plant, the baseline for future CEQA review should reflect what the physical environment looked like before the exploratory geothermal drilling began. AB 527 establishes the requirement for such a baseline, which could be informed through the surveys on natural, hydrological, and tribal resources conducted as part of the eligibility criteria for the CEQA exemption.
- A CEQA exemption for fracking? Geothermal exploration is the first phase of developing new geothermal energy resources, including next-generation geothermal energy resources. However, while geothermal energy may be an important part of a clean energy portfolio, EGS, which can include hydraulic fracturing, can have pernicious impacts on the environment, including on water quality.[1] While EGS fracking differs from traditional fracking for natural gas technology in that EGS fracking typically injects only water, some sites can use water and sand or water/proppant/gel mixtures. Internationally, EGS has also used chemical fracturing, using chemicals including regular mud acid (RMA), acid solutions, basic solutions, and chelating agents. AB 527 specifies a process by which geothermal exploratory projects will disclose the composition of fluids injected into the well to add transparency to this fracking process.
- CEQA and Tribal Resources. Through CEQA, projects must consider their impacts on tribal cultural and historical resources, and must engage in a tribal consultation process. Projects that are CEQA exempt do not go through a tribal consultation process (unless it is specified as eligibility criteria for the exemption or needed to meet some other atypical requirement). Recent amendments to AB 527 taken on the Senate Floor establish a tribal consultation process as part of using this CEQA exemption for geothermal exploratory projects.
- Jimmy Carter was President and Disco was King. CalGEM promulgated its geothermal well regulations in 1976 with some limited updates in 1979. The regulations call for certain information about well depth and construction to be disclosed to CalGEM, and provides for certain information – such as the observed temperature profile with depth – to be treated as confidential information. While well stimulation – i.e. fracturing treatments performed above the fracture pressure of the reservoir formation to increase or restore the permeability of the formation and provide for fluid flow – is utilized in some reservoirs by operators, and allowed under the supervisor’s existing authority, the existing regulations do not require disclosure of well stimulation operations or the materials used.
CalGEM has recognized that its geothermal regulations are outdated. In 2018, a discussion draft of updated geothermal regulations was circulated for comment and a revised version was circulated in 2022. It is more than overdue to finish that effort and ensure that CalGEM is well poised to regulate the new techniques used for geothermal energy development.
Recognizing that CalGEM’s geothermal regulations are out of date and that updating those regulations is important to establishing good policy, especially when removing project-specific environmental review provided by CEQA, AB 527 requires that CalGEM finish updating its geothermal well regulations by January 1, 2029.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee “The Department of Conservation (DOC) estimates one-time costs of $3.28 million in year one for internal infrastructure development and ongoing costs of about $432,000 annually for two positions (the Oil, Gas, and Geothermal Administrative Fund [OGGA]) to implement the provisions of this bill, including developing and applying specialized expertise in enhanced geothermal systems; leading collaborative efforts with similarly focused agencies from other states; reviewing and permitting of advanced geothermal wells differentiated from enhanced geothermal system wells where additional methods other than hydraulic fracturing is proposed; reviewing seismic monitoring plans; reviewing disclosures of anticipated composition and disposition of well stimulation fluids; technical support for regulatory development; and administrative support. CalGEM notes OGGA is partially funded by fees assessed on geothermal operators. In the absence of an identified funding source, to fund the work required in this bill, CalGEM would need to assess fees on geothermal operators.”
SUPPORT: (Verified 9/7/25)
Sonoma Clean Power (source)
California Community Choice Association
California State Association of Electrical Workers
California State Pipe Trades Council
Geothermal Rising
International Union of Operating Engineers, Cal-nevada Conference
San Jose Clean Energy
Solano County Democratic Central Committee
Western States Council Sheet Metal, Air, Rail and Transportation
OPPOSITION: (Verified 9/7/25)
Associated Builders and Contractors of California
California Native Plant Society
Center for Biological Diversity
Defenders of Wildlife
Mount Shasta Bioregional Ecology Center
Planning and Conservation League
ASSEMBLY FLOOR: 76-0, 5/27/25
AYES: Addis, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Castillo, Chen, Connolly, Davies, DeMaio, Dixon, Elhawary, Ellis, Flora, Fong, Gabriel, Gallagher, Garcia, Gipson, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Muratsuchi, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Sanchez, Schiavo,
Schultz, Sharp-Collins, Solache, Soria, Stefani, Ta, Tangipa, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NO VOTE RECORDED: Aguiar-Curry, Jeff Gonzalez, Nguyen
Prepared by: Brynn Cook / E.Q. / (916) 651-4108 9/8/25 21:13:55
9/8/25 21:13:55
Garcia-Gonzales DA, Shonkoff SBC, Hays J, Jerrett M. Hazardous Air Pollutants Associated with Upstream Oil and Natural Gas Development: A Critical Synthesis of Current Peer-Reviewed Literature. Annu Rev Public Health. 2019 Apr 1;40:283-304. doi: 10.1146/annurev-publhealth-040218-043715. PMID: 30935307. ↑
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 527 |
THIRD READING
Bill No: AB 527
Author: Papan (D), et al.
Amended: 7/23/25 in Senate
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 6-1, 7/2/25
AYES: Blakespear, Valladares, Dahle, Gonzalez, Hurtado, Padilla
NOES: Pérez
NO VOTE RECORDED: Menjivar
SENATE NATURAL RES. & WATER COMMITTEE: 7-0, 7/16/25
AYES: Limón, Seyarto, Allen, Grove, Hurtado, Laird, Stern
SENATE APPROPRIATIONS COMMITTEE: 7-0, 8/29/25
AYES: Caballero, Seyarto, Cabaldon, Dahle, Grayson, Richardson, Wahab
ASSEMBLY FLOOR: 76-0, 5/27/25 - See last page for vote
SUBJECT: Oil and gas: California Environmental Quality Act: geothermal exploratory projects: geothermal field development projects: enhanced geothermal system wells
SOURCE: Author
DIGEST:
This bill would provide an exemption from the California Environmental Quality Act (CEQA) for geothermal exploratory projects that meet certain criteria, as provided, and requires the Geological Energy Management Division (CalGEM) to update their regulations regarding geothermal projects.
ANALYSIS:
Existing law:
- CEQA requires a lead agency to spearhead an environmental impact report (EIR) for a project that may have a significant effect on the environment. CEQA also requires a lead agency to prepare a negative declaration (ND) for a project that will have no significant effects on the environment, or a mitigated negative declaration (MND) for projects that have no significant effects after mitigation. (Public Resources Code (PRC) §§ 21000 et seq.)
- Defines “geothermal exploratory project” as a project composed of not more than six wells and associated drilling and testing equipment, whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources prior to commencement of a geothermal field development. Wells included within a geothermal exploratory project must be located at least one-half mile from geothermal development wells which are capable of producing geothermal resources in commercial quantities. (PRC § 21065.5)
- Specifies that the Geological Energy Management Division (CalGEM) shall be the default lead agency under CEQA for geothermal exploratory projects, but that CalGEM can delegate its lead agency responsibility to a county that has adopted a geothermal element as part of its general plan.
- Defines “geothermal field development project” as a development project composed of geothermal wells, resource transportation lines, production equipment, roads, and other facilities which are necessary to supply geothermal energy to any particular heat utilization equipment for its productive life, all within an area delineated by the applicant. (Government Code § 65928.5)
- Establishes CalGEM within the Department of Conservation as the state’s geothermal well regulator. The State Oil and Gas Supervisor (supervisor) leads CalGEM.
- Proclaims that Californians have a direct and primary interest in the development of geothermal resources, and the state should exercise its power and jurisdiction to require that wells for the discovery and production of geothermal resources be drilled, operated, maintained and abandoned in such manner as to safeguard life, health, property, and the public welfare, and to encourage maximum economic recovery. (Public Resources Code (PRC) §3700)
- Requires the supervisor to so supervise the drilling, operation, maintenance and abandonment of geothermal resources wells as to encourage the greatest economic recovery of geothermal resources, to prevent damage to life, health, property, and natural resources, and to prevent damage to, and waste from, the underground geothermal deposits, and to prevent damage to underground and surface waters suitable for irrigation or domestic purposes by reason of the drilling, operation, maintenance, and abandonment of geothermal resources wells. (PRC §3714)
- Requires the supervisor to also supervise the drilling, operation, maintenance, and abandonment of wells so as to permit the owners or operators of such wells to utilize all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources, and to allow the operator to do what a prudent operator using reasonable diligence would do, as provided. (PRC §3715)
- Requires an owner or operator before drilling or re-drilling, abandoning or deepening or altering the casing of a well to file with the supervisor or CalGEM district deputy a written notice of intention to drill the well containing certain information and pay a fee. (PRC §3724)
This bill:
- Establishes a CEQA exemption for geothermal exploratory projects that meet certain criteria, as provided. Specifically, this bill would:
- Includes, expressly as part of a geothermal exploratory project, among other things, equipment and activities necessary to establish interconnectivity between wells and reservoirs.
- Excludes certain wells connecting to geothermal reservoirs from the one-half mile limit described above.
- Exempts, until January 1, 2031, from CEQA geothermal exploratory projects that meet specified conditions and for which the county is the lead agency. Before the lead agency determines that a geothermal exploratory project is exempt from CEQA, the bill would require a project developer to supply the lead agency with a survey that includes specified information.
- Authorizes the lead agency to require the project applicant to file an indemnity bond, as specified, before the lead agency determines that a geothermal exploratory project is exempt from CEQA.
- Requires the lead agency, at least 30 days before making a determination to approve or carry out a change in use pursuant to this exemption, to post a written notice on its internet website and at the project site.
- Requires the lead agency to post the entire project application on its internet website.
- Requires, if the lead agency determines that the project is exempt from CEQA, the lead agency to file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located, as provided, and to provide a copy of the notice to specified entities.
- Imposes a state-mandated local program because the exemption would apply to projects where the county is the lead agency and the county would be required to determine if a project qualifies for this exemption.
- Requires a geothermal field development project located on a site where a geothermal exploratory project was deployed pursuant to the above-described CEQA exemption to use a baseline for CEQA review that reflects the site before the geothermal exploratory project occurred.
- Requires, on or before January 1, 2029, the Geologic Energy Management Division to promulgate regulations for enhanced geothermal system wells, as provided. Before the promulgation and implementation of those regulations, the bill would require an operator to provide specified information to the supervisor when the operator files the notice of intent to commence drilling for a well in a CEQA-exempt geothermal exploratory project that employs enhanced geothermal system technology.
Background
- The a, b, c’s of CEQA. CEQA is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment. CEQA is enforced by civil lawsuits that can challenge any project’s environmental review.
Under CEQA, projects (unless they have a specific exemption) must undergo environmental analysis. This process starts with an initial study which determines what level of further environmental review is needed for a given project. If a project has no significant effects on the environment, or if those effects can be fully mitigated, the project can move forward with a negative declaration (ND) or mitigated negative declaration (MND). If the initial study finds that the project has potentially significant effects on the environment, then the lead agency submits a notice of preparation (NOP) that they are going to conduct an EIR. An EIR provides a thorough environmental review of a proposed project. Under the law, projects have one year to complete an EIR, except in extenuating circumstances.
- Advanced geothermal systems. According to the U.S. Department of Energy (U.S. DOE), many more areas may be able to utilize geothermal resources through the use of advanced geothermal systems. These new systems may be able to utilize any area where there are relatively hot rocks – not just in the well-known high-temperature geothermal resource areas such as those in Imperial County. These new systems include:
- Closed loop systems where water is circulated in a below-ground loop to gain heat energy;
- Hydrothermal systems where water is injected into subsurface strata with existing cracks in it to gain heat energy as it flows through before it is produced by a different well; and
- Enhanced geothermal systems which are similar to hydrothermal systems except the cracks are made in the subsurface strata by hydraulic fracturing or other similar techniques.
Enhanced Geothermal Systems (EGS) use three general types of well stimulation: thermal, hydraulic, and chemical stimulation. Thermal stimulation relies on the introduction of chilled water, and thus cold stress, to a geothermal reservoir. Hydraulic stimulation relies on the introduction of water or a combination of water and sand or water and gel-proppant fluids to a geothermal reservoir. Chemical well stimulation techniques involve the use of aqueous solutions to allow acids, bases, and chelating agents to be introduced into geothermal reservoirs.
The U.S. DOE estimates these next generation geothermal systems can produce up to 90 gigawatts (GW) of renewable power by 2050, and up to 300 GW depending upon storage and other emerging technologies. The U.S. DOE estimates that the cost of this power should fall to $60 - $70 per megawatt-hours (MWh) by 2030. Because of its ability to provide clean, firm power, geothermal has some comparative advantages to solar and wind, however current estimates suggest that it is likely to remain a more expensive source of energy in the foreseeable future.
- CEQA streamlining for energy projects. The Legislature has taken several measures in recent years to streamline environmental review for clean energy projects. In 2023, the Legislature passed SB 149 (Caballero, Chapter 60, Statutes of 2023), which offered CEQA judicial streamlining for certain clean energy and infrastructure projects. The CEQA judicial streamlining caps the amount of time it takes for CEQA lawsuits to move through the courts to 270 days, with all appeals, as feasible.
In the 2022 budget, the Legislature established a new, opt-in environmental review certification program at the CEC that offered streamlined CEQA environmental review of just 270 days (“AB 205”). Under existing law, EIRs much be completed in one year, except in extenuating circumstances. AB 205 only applies to certain clean energy projects, including for solar photovoltaic, terrestrial wind, geothermal, and other non-fossil, non-nuclear power plants with a generating capacity of 50 megawatts (MW) or more, for energy storage systems capable of storing 200-megawatt hours or more of electricity, and for transmission lines from those facilities to a point of connection with an electrical transmission system. Before AB 205, the CEC’s siting authority was limited to thermal power plants with capacities of 50 MW or more.
Geothermal projects are eligible for both CEQA judicial and environmental streamlining established in SB 149 and AB 205, respectively, if the specific projects meet the eligibility criteria established in those laws.
Comments
- Purpose of Bill. According to the author, “AB 527 will accelerate the development of geothermal resources and advance California's climate goals by expediting exploratory well projects which have a de minimis impact on the environment. In order to gather essential subsurface data to determine the viability of a potential geothermal field, developers must drill exploratory wells. Currently, this exploratory endeavor is treated as a separate project, subject to its own environmental review process. The federal government has previously allowed latitude concerning exploratory wells. In October 2024, the Biden Administration created a new categorical exclusion under NEPA for these de minimis exploration projects. AB 527 seeks to align California’s approach with this federal exclusion, allowing carefully vetted exploratory geothermal projects to be exempt from CEQA. This alignment will eliminate redundant regulatory hurdles, ensuring projects move forward more quickly and efficiently bringing us that much closer to our renewable energy goals.”
- What happens if an exploration is successful? AB 527 only creates a CEQA exemption for exploratory geothermal projects. Exploratory geothermal projects are the necessary first step to determine if a site is appropriate for a full geothermal energy project. Those future full geothermal projects will then go through necessary environmental review under CEQA.
However, CEQA determines whether or not a project has significant impacts compared to the existing physical conditions in the project's vicinity when environmental review begins. If the baseline for environmental review is an existing wellpad, then the required mitigation measures are likely to be much less rigorous than if the baseline was a pristine desert environment. Because the size of the area that is eligible for CEQA exemptions under AB 527 is 12 acres, full energy generating geothermal operations could be deployed within the exploratory geothermal project site.
To ensure that an exploratory geothermal project’s exemption does not become, in effect, an exemption for an entire geothermal power plant, the baseline for future CEQA review should reflect what the physical environment looked like before the exploratory geothermal drilling began. AB 527 establishes the requirement for such a baseline, which could be informed through the surveys on natural, hydrological, and tribal resources conducted as part of the eligibility criteria for the CEQA exemption.
- A CEQA exemption for fracking? Geothermal exploration is the first phase of developing new geothermal energy resources, including next-generation geothermal energy resources. However, while geothermal energy may be an important part of a clean energy portfolio, EGS, which can include hydraulic fracturing, can have pernicious impacts on the environment, including on water quality.[1] While EGS fracking differs from traditional fracking for natural gas technology in that EGS fracking typically injects only water, some sites can use water and sand or water/proppant/gel mixtures. Internationally, EGS has also used chemical fracturing, using chemicals including regular mud acid (RMA), acid solutions, basic solutions, and chelating agents. AB 527 specifies a process by which geothermal exploratory projects will disclose the composition of fluids injected into the well to add transparency to this fracking process.
- Jimmy Carter was President and Disco was King. CalGEM promulgated its geothermal well regulations in 1976 with some limited updates in 1979. The regulations call for certain information about well depth and construction to be disclosed to CalGEM, and provides for certain information – such as the observed temperature profile with depth – to be treated as confidential information. While well stimulation – i.e. fracturing treatments performed above the fracture pressure of the reservoir formation to increase or restore the permeability of the formation and provide for fluid flow – is utilized in some reservoirs by operators, and allowed under the supervisor’s existing authority, the existing regulations do not require disclosure of well stimulation operations or the materials used.
CalGEM has recognized that its geothermal regulations are outdated. In 2018, a discussion draft of updated geothermal regulations was circulated for comment and a revised version was circulated in 2022. It is more than overdue to finish that effort and ensure that CalGEM is well poised to regulate the new techniques used for geothermal energy development.
Recognizing that CalGEM’s geothermal regulations are out of date and that updating those regulations is important to establishing good policy, especially when removing project-specific environmental review provided by CEQA, AB 527 requires that CalGEM finish updating its geothermal well regulations by January 1, 2029.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee “The Department of Conservation (DOC) estimates one-time costs of $3.28 million in year one for internal infrastructure development and ongoing costs of about $432,000 annually for two positions (the Oil, Gas, and Geothermal Administrative Fund [OGGA]) to implement the provisions of this bill, including developing and applying specialized expertise in enhanced geothermal systems; leading collaborative efforts with similarly focused agencies from other states; reviewing and permitting of advanced geothermal wells differentiated from enhanced geothermal system wells where additional methods other than hydraulic fracturing is proposed; reviewing seismic monitoring plans; reviewing disclosures of anticipated composition and disposition of well stimulation fluids; technical support for regulatory development; and administrative support. CalGEM notes OGGA is partially funded by fees assessed on geothermal operators. In the absence of an identified funding source, to fund the work required in this bill, CalGEM would need to assess fees on geothermal operators.”
SUPPORT: (Verified 8/29/25)
California Community Choice Association
California State Association of Electrical Workers
California State Pipe Trades Council
Geothermal Rising
International Union of Operating Engineers, Cal-nevada Conference
San Jose Clean Energy
Solano County Democratic Central Committee
Sonoma Clean Power
Western States Council Sheet Metal, Air, Rail and Transportation
OPPOSITION: (Verified 8/29/25)
Associated Builders and Contractors of California
California Native Plant Society
Center for Biological Diversity
Defenders of Wildlife
Mount Shasta Bioregional Ecology Center
Planning and Conservation League
ASSEMBLY FLOOR: 76-0, 5/27/25
AYES: Addis, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Castillo, Chen, Connolly, Davies, DeMaio, Dixon, Elhawary, Ellis, Flora, Fong, Gabriel, Gallagher, Garcia, Gipson, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Muratsuchi, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Sanchez, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ta, Tangipa, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NO VOTE RECORDED: Aguiar-Curry, Jeff Gonzalez, Nguyen
Prepared by: Brynn Cook / E.Q. / (916) 651-4108
8/29/25 20:39:01
**** END ****
Garcia-Gonzales DA, Shonkoff SBC, Hays J, Jerrett M. Hazardous Air Pollutants Associated with Upstream Oil and Natural Gas Development: A Critical Synthesis of Current Peer-Reviewed Literature. Annu Rev Public Health. 2019 Apr 1;40:283-304. doi: 10.1146/annurev-publhealth-040218-043715. PMID: 30935307. ↑
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
AB 527 (Papan) - Oil and gas: California Environmental Quality Act: geothermal exploratory projects: geothermal field development projects: enhanced geothermal system wells
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would provide an exemption from the California Environmental Quality Act (CEQA) for geothermal exploratory projects that meet certain criteria, as provided.
Fiscal Impact:
- The Department of Conservation (DOC) estimates one-time costs of $3.28 million in year one for internal infrastructure development and ongoing costs of about $432,000 annually for two positions (the Oil, Gas, and Geothermal Administrative Fund [OGGA]) to implement the provisions of this bill, including developing and applying specialized expertise in enhanced geothermal systems; leading collaborative efforts with similarly focused agencies from other states; reviewing and permitting of advanced geothermal wells differentiated from enhanced geothermal system wells where additional methods other than hydraulic fracturing is proposed; reviewing seismic monitoring plans; reviewing disclosures of anticipated composition and disposition of well stimulation fluids; technical support for regulatory development; and administrative support. CalGEM notes OGGA is partially funded by fees assessed on geothermal operators. In the absence of an identified funding source, to fund the work required in this bill, CalGEM would need to assess fees on geothermal operators.
Background:
Geothermal energy comes from heat stored in rocks and fluids in the Earth’s crust, according to the Geologic Energy Management Division (CalGEM). Geothermal fluids include both hot water and steam . There are more than 650 active, high temperature wells in the state’s geothermal fields. Fluids from these wells are used to generate electricity at adjacent power plants.
California is the single largest generator of electricity from geothermal energy in the country. As of 2018, there were 43 operating geothermal power plants in the state with an installed capacity of about 2.7 gigawatts (GW). In 2022, about 5% of the state’s electrical energy came from geothermal resources.
Geothermal energy is considered to be a renewable energy resource, and is anticipated to be an important clean energy-producing component of the state meeting its 2045 carbon neutrality target. Geothermal energy provides baseload renewable energy which can help fill in the evening and winter gaps in renewable power generation capacity when solar and wind are not generating sufficient energy to meet the state’s needs. Advances in technology suggest that many more locations will have sufficient subsurface geothermal resources in the near future to viably produce energy. New technology may also allow geothermal power plants to provide more than baseload services.
Geothermal wells in the state – except for those on federal leases – are permitted, drilled, operated, and permanently sealed under CalGEM’s auspices. Any proposed well must demonstrate compliance CEQA prior to CalGEM permitting the well. Surface activities that are supported by geothermal wells are regulated primarily by the local jurisdiction where the well is located if the power plant is less than 50 megawatts (MW) in size. The California Energy Commission (CEC) provides additional oversight for the permitting of power plants larger than 50 MW in size. Other agencies, such as the State Water Resources Control Board and Regional Water Quality Control Boards, may also have a permitting role for a geothermal project.
Geothermal energy projects generally have two phases. There is an exploratory phase – where the resource is evaluated and mapped – and a field development phase. A geothermal exploratory project is limited to wells and certain necessary surface support equipment. A geothermal field development project would be much larger in scope and include a power plant.
CEQA. CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration (ND). If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an environmental impact report (EIR).
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
CEQA streamlining for energy projects. According to the Senate Environmental Quality Committee, the Legislature has taken several measures in recent years to streamline environmental review for clean energy projects. In 2023, the Legislature passed SB 149 (Caballero, Chapter 60, Statutes of 2023), which offered CEQA judicial streamlining for certain clean energy and infrastructure projects. The CEQA judicial streamlining caps the amount of time it takes for CEQA lawsuits to move through the courts to 270 days, with all appeals, as feasible.
In the 2022 budget, the Legislature established a new, opt-in environmental review certification program at the CEC that offered streamlined CEQA environmental review of just 270 days (“AB 205”). Under existing law, EIRs much be completed in one year, except in extenuating circumstances. AB 205 only applies to certain clean energy projects, including for solar photovoltaic, terrestrial wind, geothermal, and other non-fossil, non-nuclear power plants with a generating capacity of 50 MW or more, for energy storage systems capable of storing 200-megawatt hours or more of electricity, and for transmission lines from those facilities to a point of connection with an electrical transmission system. Before AB 205, the CEC’s siting authority was limited to thermal power plants with capacities of 50 MW or more.
Geothermal projects are eligible for both CEQA judicial and environmental streamlining established in SB 149 and AB 205, respectively, if the specific projects meet the eligibility criteria established in those laws.
Proposed Law:
This bill would provide an exemption from CEQA for geothermal exploratory projects that meet certain criteria, as provided. Specifically, this bill would:
- Expressly include as part of a geothermal exploratory project, among other things, equipment and activities necessary to establish interconnectivity between wells and reservoirs.
- Exclude certain wells connecting to geothermal reservoirs from the one-half mile limit described above.
- Until January 1, 2031, exempt from CEQA geothermal exploratory projects that meet specified conditions and for which the county is the lead agency. Before the lead agency determines that a geothermal exploratory project is exempt from CEQA, the bill would require a project developer to supply the lead agency with a survey that includes specified information.
- Authorize the lead agency to require the project applicant to file an indemnity bond, as specified, before the lead agency determines that a geothermal exploratory project is exempt from CEQA.
- Require the lead agency, at least 30 days before making a determination to approve or carry out a change in use pursuant to this exemption, to post a written notice on its internet website and at the project site.
- Require the lead agency to post the entire project application on its internet website.
- If the lead agency determines that the project is exempt from CEQA, the bill would require the lead agency to file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located, as provided, and to provide a copy of the notice to specified entities.
- Because the exemption would apply to projects where the county is the lead agency and the county would be required to determine if a project qualifies for this exemption, the bill would impose a state-mandated local program.
- Require a geothermal field development project located on a site where a geothermal exploratory project was deployed pursuant to the above-described CEQA exemption to use a baseline for CEQA review that reflects the site before the geothermal exploratory project occurred..
- Require, on or before January 1, 2029, the Geologic Energy Management Division to promulgate regulations for enhanced geothermal system wells, as provided. Before the promulgation and implementation of those regulations, the bill would require an operator to provide specified information to the supervisor when the operator files the notice of intent to commence drilling for a well in a CEQA-exempt geothermal exploratory project that employs enhanced geothermal system technology.
Related Legislation:
AB 531 (Rogers, 2025) would expand the definition of "facility" for purposes of prescribing the types of projects for which the project proponent may request the CEC permit on an expedited basis, to include a geothermal powerplant or a geothermal field development project.
AB 1359 (Papan, Chapter 678, Statutes of 2024) authorizes CalGEM to delegate lead agency authority under CEQA for geothermal exploratory projects, as provided
SB 149 (Caballero, Chapter 60, Statutes of 2023) makes a broad swath of energy, transportation, water, and semiconductor projects eligible for expedited judicial review under CEQA. Projects must meet certain environmental and labor criteria to be eligible for certification. The streamlining certification ends January 1, 2033.
-- END --
SENATE COMMITTEE ON NATURAL RESOURCES AND WATER
Senator Monique Limón, Chair
2025 - 2026 Regular
Bill No: AB 527 Hearing Date: July 16, 2025
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
Subject: California Environmental Quality Act: geothermal exploratory projects: geothermal field development projects
SUMMARY
This bill would provide an exemption from the California Environmental Quality Act (CEQA) for geothermal exploratory projects that meet certain criteria, as provided.
BACKGROUND AND EXISTING LAW
Geothermal energy
Geothermal energy comes from heat stored in rocks and fluids in the Earth’s crust, according to the Geologic Energy Management Division (CalGEM). Geothermal fluids include both hot water and steam[1]. There are more than 650 active, high temperature wells in the state’s geothermal fields. Fluids from these wells are used to generate electricity at adjacent power plants.
California is the single largest generator of electricity from geothermal energy in the country. As of 2018, there were 43 operating geothermal power plants in the state with an installed capacity of about 2.7 gigawatts (GW). In 2022, about 5% of the state’s electrical energy came from geothermal resources.
Geothermal energy is considered to be a renewable energy resource, and is anticipated to be an important clean energy-producing component of the state meeting its 2045 carbon neutrality target. Geothermal energy provides baseload renewable energy which can help fill in the evening and winter gaps in renewable power generation capacity when solar and wind are not generating sufficient energy to meet the state’s needs. Advances in technology suggest that many more locations will have sufficient subsurface geothermal resources in the near future to viably produce energy. New technology may also allow geothermal power plants to provide more than baseload services.
Geothermal wells in the state – except for those on federal leases – are permitted, drilled, operated, and permanently sealed under CalGEM’s auspices. Any proposed well must demonstrate compliance CEQA prior to CalGEM permitting the well. Surface activities that are supported by geothermal wells are regulated primarily by the local jurisdiction where the well is located if the power plant is less than 50 megawatts (MW) in size. The California Energy Commission (CEC) provides additional oversight for the permitting of power plants larger than 50 MW in size. Other agencies, such as the State Water Resources Control Board and Regional Water Quality Control Boards, may also have a permitting role for a geothermal project.
Geothermal energy projects generally have two phases. There is an exploratory phase – where the resource is evaluated and mapped – and a field development phase. A geothermal exploratory project is limited to wells and certain necessary surface support equipment. A geothermal field development project would be much larger in scope and include a power plant.
Next generation geothermal energy development
Conventional geothermal energy wells depend upon very specific geology – comparatively hot, permeable rock formations relatively near the surface. The geothermal brine is heated by the formation, and pumped up to the surface by a well. The heat is used to generate electricity.
There are at least two “next generation” geothermal energy techniques which are less limited geologically than conventional geothermal energy development:
- “Enhanced geothermal” typically uses hydraulic fracturing (i.e. fracking) of comparatively hot geologic formations relatively near the surface to make them permeable for the working fluid. Thermal or chemical stimulation can also be used to improve the permeability of the geologic reservoir/formation. Once the reservoir permeability is improved, the geothermal working fluid (typically water) is injected into the reservoir/formation by one well and pumped out by another after heating. Fervo Energy has reported successful pilot projects in Utah that use enhanced geothermal as has the U.S. Department of Energy backed “Frontier Observatory for Research in Geothermal Energy” (FORGE) project, similarly located in Utah.
- “Advanced geothermal” is a broad category and includes additional methods to fracture the geologic formation than hydraulic fracturing, such as microwave technology; closed-loop systems; or the drilling of very deep wells. Drilling very deep wells has technological challenges, but can result in conditions that are relatively more efficient for subsequent energy production.
The U.S. Department of Energy estimates these next generation geothermal systems can produce up to 90 GW of renewable power by 2050, and up to 300 GW depending upon storage and other emerging technologies. The recent federal budget reconciliation bill – the “One Big Beautiful Bill” – cut some renewable energy tax credits and support, but left those for geothermal energy intact.
CEQA
CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration (ND). If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an environmental impact report (EIR).
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
CEQA streamlining for energy projects
According to the Senate Environmental Quality Committee, the Legislature has taken several measures in recent years to streamline environmental review for clean energy projects. In 2023, the Legislature passed SB 149 (Caballero, Chapter 60, Statutes of 2023), which offered CEQA judicial streamlining for certain clean energy and infrastructure projects. The CEQA judicial streamlining caps the amount of time it takes for CEQA lawsuits to move through the courts to 270 days, with all appeals, as feasible.
In the 2022 budget, the Legislature established a new, opt-in environmental review certification program at the CEC that offered streamlined CEQA environmental review of just 270 days (“AB 205”). Under existing law, EIRs much be completed in one year, except in extenuating circumstances. AB 205 only applies to certain clean energy projects, including for solar photovoltaic, terrestrial wind, geothermal, and other non-fossil, non-nuclear power plants with a generating capacity of 50 MW or more, for energy storage systems capable of storing 200-megawatt hours or more of electricity, and for transmission lines from those facilities to a point of connection with an electrical transmission system. Before AB 205, the CEC’s siting authority was limited to thermal power plants with capacities of 50 MW or more.
Geothermal projects are eligible for both CEQA judicial and environmental streamlining established in SB 149 and AB 205, respectively, if the specific projects meet the eligibility criteria established in those laws.
Existing law:
- Establishes CalGEM within the Department of Conservation as the state’s geothermal well regulator. The State Oil and Gas Supervisor (supervisor) leads CalGEM.
- Proclaims that Californians have a direct and primary interest in the development of geothermal resources, and the state should exercise its power and jurisdiction to require that wells for the discovery and production of geothermal resources be drilled, operated, maintained and abandoned in such manner as to safeguard life, health, property, and the public welfare, and to encourage maximum economic recovery. (Public Resources Code (PRC) §3700)
- Requires the supervisor to so supervise the drilling, operation, maintenance and abandonment of geothermal resources wells as to encourage the greatest economic recovery of geothermal resources, to prevent damage to life, health, property, and natural resources, and to prevent damage to, and waste from, the underground geothermal deposits, and to prevent damage to underground and surface waters suitable for irrigation or domestic purposes by reason of the drilling, operation, maintenance, and abandonment of geothermal resources wells. (PRC §3714)
- Requires the supervisor to also supervise the drilling, operation, maintenance, and abandonment of wells so as to permit the owners or operators of such wells to utilize all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources, and to allow the operator to do what a prudent operator using reasonable diligence would do, as provided. (PRC §3715)
- Requires an owner or operator before drilling or re-drilling, abandoning or deepening or altering the casing of a well to file with the supervisor or CalGEM district deputy a written notice of intention to drill the well containing certain information and pay a fee. (PRC §3724)
- Requires, upon the completion or abandonment of any geothermal well, that true copies of the log, core record, history, and other materials, as specified, be provided to the CalGEM district deputy, as provided. (PRC §3735)
- Defines geothermal resources to mean the natural heat of the earth, the energy, in whatever form, below the surface of the earth present in, resulting, from, or created by, or which may be extracted from, such natural heat, and all minerals in solution or other products obtained from naturally heated fluids, brines, associated gases, and steam, in whatever form, below the surface of the earth, but excluding oil, hydrocarbon gas, or other hydrocarbon substances. (PRC §6903)
- Defines a geothermal exploratory project to be not more than six wells and for the purpose of evaluating the presence and characteristics of geothermal resources prior to starting a geothermal field development project. For purposes of preparing an environmental document the environmental impacts shall be limited to the proposed drill sites, the proposed wells, and any roads or other facilities that may be required before the exploratory wells can be drilled. Application requirements include a narrative description including the probable short-term and long-term impacts of the project, and acceptable mitigation measures. (see PRC §21065.6; Title 14, California Code of Regulations, §§1680 et seq.)
- CEQA requires a lead agency to spearhead an EIR for a project that may have a significant effect on the environment. CEQA also requires a lead agency to prepare an ND for a project that will have no significant effects on the environment, or a mitigated negative declaration (MND) for projects that have no significant effects after mitigation. (PRC §§21000 et seq.)
- Specifies that CalGEM shall be the default lead agency under CEQA for geothermal exploratory projects, but that CalGEM can delegate its lead agency responsibility to a county that has adopted a geothermal element as part of its general plan.
- Defines “geothermal field development project” as a development project composed of geothermal wells, resource transportation lines, production equipment, roads, and other facilities which are necessary to supply geothermal energy to any particular heat utilization equipment for its productive life, all within an area delineated by the applicant. (Government Code §65928.5)
PROPOSED LAW
This bill would provide an exemption from CEQA for geothermal exploratory projects that meet certain criteria, as provided.
Specifically, this bill would:
- Provide that CEQA does not apply to a geothermal exploratory project for which a county is the lead agency, if the lead agency determines that the project meets all of the following conditions:
- The project does not include the production of geothermal resources in commercial quantities;
- The project does not disturb more than 12 acres of previously undisturbed ground;
- The project's footprint does not include, or lie within 100 feet of, any of the following:
- Wetlands;
- Rivers, streams, or riparian corridors, except temporary road or electric distribution line crossings;
- Lands identified for conservation in an adopted natural community conservation plan, habitat conservation plan, or other adopted natural resource protection plan;
- Identified habitat for species of special status identified by state or federal agencies; or
- Lands with a conservation easement unless determined consistent with the terms or requirements of the easement;
- Unusual circumstances do not exist that would cause the project to have a significant impact on the environment;
- The project site is not on the "Cortese List" (i.e., known contaminated sites);
- The project will not cause a substantial adverse change in the significance of a historical resource or a tribal cultural resource;
- The project includes full reclamation of all well pads, temporary routes, and other disturbances, including the reestablishment of vegetative cover with native plants, unless those disturbances are incorporated into a subsequent geothermal field development project; and
- The project applicant has certified to the lead agency that either the entirety of the project is a "public work" or all construction workers will be paid prevailing wages, as specified.
- Require the applicant to submit to the lead agency a preliminary description of anticipation composition of the well stimulation fluids to be used in the geothermal exploratory project, and disclose certain additional records when well drilling has been completed, as provided.
- Require the project developer to provide the lead agency with a survey that includes, but is not limited to, all of the following:
- The identification of natural resources including sensitive species of flora and fauna, sensitive habitats and hydrological resources including groundwater wells, springs, and aquifers.
- The identification of any tribal, historical, and other cultural resources.
- Authorize the lead agency to require the project applicant file an indemnity bond in an amount sufficient to secure any supplemental costs beyond the applicant's bonding requirements with CalGEM to secure full reclamation of the project site.
- Require the lead agency to post a written notice of the intent to apply the exemption on its internet website and at the project site at least 30 days before making a determination to approve or carry out a change in use.
- Require the lead agency to file a notice of exemption with the State Clearinghouse in the Office of Land Use and Climate Innovation (LCI) and with the county clerk of the county in which the project is located.
- Sunset the exemption on January 1, 2031.
- Revise the definition of "geothermal exploratory project" to include "equipment and activities necessary to establish interconnectivity between wells and reservoirs, temporary roads, electric distribution lines, and infrastructure to provide power for drilling and testing equipment" and eliminate the requirement that exploratory project wells must be "located at least one-half mile from geothermal development wells which are capable of producing geothermal resources in commercial quantities."
- Make relevant legislative findings and declarations.
ARGUMENTS IN SUPPORT
According to the author, “AB 527 will accelerate the development of geothermal resources and advance California's climate goals by expediting exploratory well projects which have a de minimis impact on the environment. In order to gather essential subsurface data to determine the viability of a potential geothermal field, developers must drill exploratory wells. Currently, this exploratory endeavor is treated as a separate project, subject to its own environmental review process. The federal government has previously allowed latitude concerning exploratory wells. In October 2024, the Biden Administration created a new categorical exclusion under [National Environmental Protection Act] for these de minimis exploration projects. AB 527 seeks to align California’s approach with this federal exclusion, allowing carefully vetted exploratory geothermal projects to be exempt from CEQA. This alignment will eliminate redundant regulatory hurdles, ensuring projects move forward more quickly and efficiently bringing us that much closer to our renewable energy goals.”
ARGUMENTS IN OPPOSITION
According to the Planning and Conservation League in a joint sign-on letter note “While the background document mentions ‘perceived regulatory challenges’ and discusses the competitive advantage that may shift siting to other states, there is no detailed information about any actual regulatory roadblocks to permitting geothermal exploration in California.”
“Further, the need for this CEQA exemption is premature. Just last year, the Legislature passed AB 1359 (Papan). This bill removed CalGEM as the lead agency under CEQA for geothermal exploratory projects […] and transferred that responsibility to counties upon the request of an applicant. We do not understand how there could be ‘regulatory challenges’ to a law that was enacted at the beginning of this year.”
“Instead, it is our experience that many of these projects go through lead agency review in a timely manner and with few challenges. Complying with California’s important environmental laws is critical to protecting public health, the environment and cultural resources while developing energy projects.”
The opposition additionally notes the author’s willingness to work with them and calls for improved natural resources and cultural protections, a reduced footprint, and notes the use of fracking for enhanced geothermal development.
COMMENTS
This bill is double referred. This bill has been referred to both the Senate Committee on Environmental Quality and this Committee for hearing. This Committee is the second Committee of referral. This bill was heard in the Senate Committee on Environmental Quality on July 2, 2025, and passed out with a vote of 6 – 1 (1 DNV). Elements of this bill under the jurisdiction of the Senate Committee on Environmental Quality are included here for completeness and context only.
Jimmy Carter was President and Disco was King. CalGEM promulgated its geothermal well regulations in 1976 with some limited updates in 1979. The regulations call for certain information about well depth and construction to be disclosed to CalGEM, and provides for certain information – such as the observed temperature profile with depth – to be treated as confidential information. While well stimulation – i.e. fracturing treatments performed above the fracture pressure of the reservoir formation to increase or restore the permeability of the formation and provide for fluid flow – is utilized in some reservoirs by operators, and allowed under the supervisor’s existing authority, the existing regulations do not require disclosure of well stimulation operations or the materials used. This is reminiscent of CalGEM’s insistence that it regulated fracking on oil and gas wells prior to the passage of SB 4 (Pavley, Chapter 313, Statutes of 2013), which provided the statutory framework to explicitly regulate fracking of oil and gas wells, without actually collecting any data or requiring the disclosure of data about the operations performed. It is unclear how a regulator can regulate if it does not have records of all that is performed under its auspices.
CalGEM has recognized that its geothermal regulations are outdated. In 2018, a discussion draft of updated geothermal regulations was circulated for comment and a revised version was circulated in 2022. It is more than overdue to finish that effort and ensure that CalGEM is well poised to regulate the new techniques used for geothermal energy development.
Further, while amendments taken in the Senate Committee on Environmental Quality Committee provide for certain surveys to be performed, it is relevant to this Committee’s jurisdiction that there be documentation that species subject to protection under state and federal law not be found at the project site.
In view of this, the Committee may wish to amend the bill as follows:
- Require CalGEM to finish updating its geothermal well regulations by January 1, 2029 while specifically authorizing that well permitting can continue with additional disclosures regarding well stimulation and seismic activity provided to CalGEM when applying to obtain a notice of intention to drill or rework an enhanced geothermal system well as part of a geothermal exploratory project subject to the CEQA exemption proposed herein, as specified.
- Provide a savings clause for the supervisor’s authority to permit geothermal wells.
- Specify that the log for an enhanced geothermal system well that is part of a geothermal exploratory project subject to the CEQA exemption proposed herein includes the chemical and physical characteristics of the well stimulation fluid, and amounts used for well stimulation, as provided. The log is part of the formal recordkeeping for a well.
- Specify which categories of protected species the natural resources survey conducted for the lead agency should include, as provided.
- Require the lead agency to post online the project application for a geothermal exploratory project seeking a CEQA exemption. Require the lead agency to provide a copy of the notice of exemption filed with the State Clearinghouse to the Department of Fish and Wildlife and regional water quality board.
- Specify that wells that are part of a geothermal exploratory project subject to the CEQA exemption must be setback 300 feet from the project site boundary, a building open to the public, or property line of an adjacent property, as provided, and 100 feet from a public road necessary to access the project site.
- Make various additional technical and conforming changes to address geothermal exploratory project wells subject to the CEQA exemption. [Amendment #1]
Geothermal is increasingly cost-competitive
The figure[2] below indicates that geothermal energy development has become cost-competitive with other energy generation sources even without taking federal subsidies into consideration.
Recent related legislation
AB 531 (Rogers, 2025) would expand the definition of "facility" for purposes of prescribing the types of projects for which the project proponent may request the CEC permit on an expedited basis, to include a geothermal powerplant or a geothermal field development project. (This bill is pending hearing in the Senate Environmental Quality Committee.)
AB 1359 (Papan, Chapter 678, Statutes of 2024) authorizes CalGEM to delegate lead agency authority under CEQA for geothermal exploratory projects, as provided.
SB 149 (Caballero, Chapter 60, Statutes of 2023) makes a broad swath of energy, transportation, water, and semiconductor projects eligible for expedited judicial review under CEQA. Projects must meet certain environmental and labor criteria to be eligible for certification. The streamlining certification ends January 1, 2033.
SUGGESTED AMENDMENTS
AMENDMENT 1
Delete Section 1 (legislative findings and declarations)
Revise Section 2 (PRC §21065.5) to read as follows:
21065.5. “Geothermal exploratory project” means a project as defined in Section 21065 composed of not more than six wells and associated drilling and testing equipment, including equipment and activities necessary to establish interconnectivity between wells and reservoirs, temporary roads, electric distribution lines, and infrastructure to provide power for drilling and testing equipment, whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources before commencement of a geothermal field development project as defined in Section 65928.5 of the Government Code. Wells included within a geothermal exploratory project, excluding wells connecting to geothermal reservoirs whose permeability has been increased from their natural or original state through stimulation, horizontal drilling, or other techniques, must be located at least one-half mile from geothermal development wells which are capable of producing geothermal resources in commercial quantities.
Revise Section 3 (PRC §21080.67) to read as follows:
21080.67. (a) This division does not apply to a geothermal exploratory project, as defined in Section 21065.5, for which a county is the lead agency pursuant to Section 3715.5, including any permit, funding, or other approval by a state or local agency for the geothermal exploratory project as may be required by this division, if the lead agency determines that the geothermal exploratory project meets all of the following conditions:
(1) The project does not include the production of geothermal resources in commercial quantities.
(2) The project does not disturb more than 12 acres of previously undisturbed ground at the surface and no more than 20 acres total at the surface. The calculation of the 20 acre total does not include existing roads used to access the project site. “Undisturbed” means in a natural state without industrial or other development.
(3) The project’s footprint does not include, or lie within 100 feet of, any of the following, except as noted:
(A) 300 feet of Wetlands as defined in subdivision (l) of section 21067.5.
(B) Rivers, streams, or riparian corridors, except temporary road or electric distribution line crossings undertaken pursuant to an agreement issued by the Department of Fish and Wildlife pursuant to Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code.
(C) Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), a habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(D) Identified habitat for species of special status identified by state or federal agencies, including fully protected species designated by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(E) Lands with a conservation easement unless determined consistent with the terms or requirements of the easement.
(4) Unusual circumstances do not exist that would cause the project to have a significant impact on the environment.
(5) The project is not located on a site that is included on any list compiled pursuant to Section 65962.5 of the Government Code.
(6) The project will not cause a substantial adverse change in the significance of a historical resource or a tribal cultural resource.
(7) The project will not adversely impact any species designated for protection under the following state and federal laws: fully protected species (Fish and Game Code sections 3511, 5050, 5515, 4700), the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code) as determined by the baseline biological resources survey pursuant to (b)(1).
(8) (7) The project includes full reclamation of all well pads, temporary routes, and other disturbances, including the reestablishment of vegetative cover with native plants, unless those disturbances are incorporated into a subsequent geothermal field development project, as defined in Section 65928.5 of the Government Code.
(9) (8) The project applicant has provided to the lead agency a legally binding commitment to comply with Section 21183.5.
(10)(A) (9) (1) The applicant has submitted to the lead agency a preliminary description of the anticipated composition of fluids to be used for any hydraulic fracturing operations expected to occur in the geothermal exploratory project.
(B) (2) When making a filing pursuant to Section 3735 to the Geologic Energy Management Division of the Department of Conservation, the applicant shall include a disclosure of the composition of fluids used in all relevant operations, and shall file a copy of this disclosure with the lead agency.
(b) Before the lead agency determines that a project is not subject to this division pursuant to this section, the project developer shall supply the lead agency with a survey that includes, but is not limited to, all of the following:
(1) The identification of natural resources including sensitive species of flora and fauna, sensitive habitats and hydrological resources including groundwater wells, springs, and aquifers.
(A) In order to comply with paragraph (1), the project developer shall have a biological resources survey conducted in order to, at a minimum, identify any species protected pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code), or identified as fully protected species (Fish and Game Code sections 3511, 5050, 5515, 4700) or species of special concern. The survey shall be conducted using best practices, including the identification of the relevant protocols and guidelines used.
(2) The identification of any tribal, historical, and other cultural resources.
(c) If the lead agency determines that a project is not subject to this division pursuant to this section, the requirements of Section 21183.5 shall apply.
(d) The lead agency may require the project applicant to file an indemnity bond before it makes its determination pursuant to subdivision (a). The bond, in a form and manner prescribed by the lead agency, shall be in an amount sufficient to secure any supplemental costs beyond the applicant’s bonding requirements with the Geologic Energy Management Division, pursuant to Section 3725, to secure full reclamation of the project site.
(e) At least 30 days before making a determination to approve or carry out a change in use pursuant to this section, the lead agency shall post a written notice of the intent to apply the exemption on its internet website and at the project site. The project application shall also be posted online in its entirety.
(f) If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to approve or carry out the project, the lead agency shall file a notice with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located in accordance with subdivisions (b), (c), and (d) of Section 21152. The lead agency shall provide a copy of the notice filed with the State Clearinghouse to the Department of Fish and Wildlife and the California regional water quality control board.
(g) This section shall remain in effect only until January 1, 2031, and as of that date is repealed.
Add 2 sections in Chapter 4 of Division 3 of the Public Resources Code:
37XX. (a) On or by January 1, 2029, the division shall promulgate regulations for enhanced geothermal system wells as part of an update to regulations for geothermal wells, that explicitly include and address:
(1) seismic risks
(2) well construction, including required material composition and construction design for the entire range of anticipated subsurface conditions, including the chemical composition and physical properties off the geologic formations, including any fluids.
(3) fracture propagation from well stimulation
(4) geologic and hydrologic isolation of the geothermal fluids and reservoir
(b) It is the intent of the Legislature that the division incorporate the development of regulations pursuant to this section in its existing effort to update geothermal regulations, previously workshopped by the division in 2018 and 2022, already underway in order to support the development of enhanced geothermal systems.
(c) Prior to the promulgation and implementation of enhanced geothermal system well regulations, the operator shall provide the following information to the supervisor when filing a written notice of intention pursuant to section 3724 for a well in a geothermal exploratory project subject to 21080.67 employing enhanced geothermal system technology as follows:
(1) a plan for seismic monitoring consistent with US Department of Energy published “Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems” published January 2012 that meets or exceeds the seismic monitoring requirements of 14 CCR 1785.1.
(2) Full disclosure of the anticipated composition and disposition of well stimulation fluids, if planned to be used, and shall, at a minimum, include:
(A) The anticipated date of the well stimulation treatment.
(B) A complete list of the names, Chemical Abstract Service (CAS) numbers, and maximum concentration, in percent by mass, of each and every chemical constituent of the well stimulation fluids anticipated to be used. If a CAS number does not exist for a chemical constituent, the owner or operator may provide another unique identifier, if available.
(C) The trade name, the supplier, concentration, and a brief description of the intended purpose of each additive (as defined in section 3150), including any proppants (as defined in section 3154), contained in the anticipated well stimulation fluid.
(D) The location of the portion of the well subject to the well stimulation treatment and the extent of the fracturing or other modification, if any, in the geologic formation surrounding the well induced by the treatment.
(3)(A) The information provided in paragraphs (1) and (2) is not confidential information pursuant to section 3752.
(B) The information provided in paragraphs (1) and (2) may be provided to the supervisor with the first application for a written notice of intention pursuant to section 3724 for a well in a geothermal exploratory project subject to 21080.67 and may be referenced in subsequent applications for the same project if the same information applies to all wells.
(d) (1)Nothing in this section prohibits the supervisor from asking for additional pertinent data in considering the notice of intention pursuant to subdivision (d) of section 3724.
(2) Nothing in this section prohibits the supervisor, pursuant to the supervisor’s existing authority under this chapter, to approve wells that utilize all methods and practices known to the industry for the purpose of increasing the ultimate recovery of geothermal resources, and which, in the opinion of the supervisor, are suitable for such purpose in each case, prior to the promulgation of the regulations pursuant to subdivision (a).
37XZ. (a) Except as provided in subdivision (b), Any well that is included in a geothermal exploratory project pursuant to 21080.67 shall be setback at least 300 feet from the boundary of the project site, building open to the public, if present or property line of an adjacent property that is not part of the project.
(b) Any well that is included in a geothermal exploratory project pursuant to section 21080.67 shall be setback at least 100 feet from a public road necessary to accessing the project site.
Amend PRC §3731 to read as follows:
3731. (a) The log shall show the character and depth of the formation passed through or encountered in the drilling of the well, the amount, size and weight of casing used, and particularly the location, depth and temperature of waterbearing strata, together with the temperature, chemical composition, and other chemical and physical characteristics of fluid encountered from time to time, so far as ascertained.
(b). For a well that is part of a geothermal exploratory project pursuant to 21080.67 employing enhanced geothermal system technology, the log shall include the chemical and physical characteristics of well stimulation fluids, including additives and proppants, if any, and amounts used for any well stimulation.
SUPPORT
Sonoma Clean Energy (sponsor)
Cal-Neva International Union of Operating Engineers
California Community Choice Association
California State Association of Electrical Workers
California State Pipe Trades Council
Citizens’ Climate Lobby Santa Rosa and North.
City of Cloverdale
County of Sonoma
Eavor, Inc.
Fervo Energy
Geothermal Rising
Northern Sonoma County Air Pollution Control District
Ormat Technologies
San Jose Clean Energy
Solano County Democratic Central Committee
USGBC California
Western State Council Sheet Metal, Air, Rail and Transportation
XGS Energy
OPPOSITION
Associated Builders and Contractors of California (unless amended)
California Native Plant Society (unless amended)
Center for Biological Diversity (unless amended)
Defenders of Wildlife (unless amended)
Mount Shasta Bioregional Ecology Center (unless amended)
Planning and Conservation League (unless amended)
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 527
Author:(Papan)
As Amended Ver:May 5, 2025
Majority vote
SUMMARY
Establishes an exemption from the California Environmental Quality Act (CEQA) for geothermal exploratory projects, if a county is the lead agency and specified conditions are met, including full reclamation of the project site.
Major Provisions
- Provides that CEQA does not apply to a geothermal exploratory project for which a county is the lead agency, if the lead agency determines that the project meets all of the following conditions:
- The project does not include the production of geothermal resources in commercial quantities.
- The project does not disturb more than 12 acres of previously undisturbed ground.
- The project's footprint does not include, or lie within 100 feet of, any of the following:
- Wetlands.
- Rivers, streams, or riparian corridors, except temporary road or electric distribution line crossings.
- Lands identified for conservation in an adopted natural community conservation plan, habitat conservation plan, or other adopted natural resource protection plan.
- Identified habitat for species of special status identified by state or federal agencies.
- Lands with a conservation easement unless determined consistent with the terms or requirements of the easement.
- Unusual circumstances do not exist that would cause the project to have a significant impact on the environment.
- The project site is not on the "Cortese List" (i.e., known contaminated sites).
- The project will not cause a substantial adverse change in the significance of a historical resource or a tribal cultural resource.
- The project includes full reclamation of all well pads, temporary routes, and other disturbances, including the reestablishment of vegetative cover with native plants, unless those disturbances are incorporated into a subsequent geothermal field development project.
- The project applicant has certified to the lead agency that either of the entirety of the project is a "public work" or all construction workers will be paid prevailing wages, as specified.
- Authorizes the lead agency to require the project applicant file an indemnity bond in an amount sufficient to secure any supplemental costs beyond the applicant's bonding requirements with the Geologic Energy Management Division to secure full reclamation of the project site.
- Requires the lead agency to post a written notice of the intent to apply the exemption on its internet website and at the project site at least 30 days before making a determination to approve or carry out a change in use.
- Requires the lead agency to file a notice of exemption with the State Clearinghouse in the Office of Land Use and Climate Innovation and with the county clerk of the county in which the project is located.
- Sunsets the exemption January 1, 2031.
- Revises the definition of "geothermal exploratory project" to include "equipment and activities necessary to establish interconnectivity between wells and reservoirs, temporary roads, electric distribution lines, and infrastructure to provide power for drilling and testing equipment" and eliminate the requirement that exploratory project wells must be "located at least one-half mile from geothermal development wells which are capable of producing geothermal resources in commercial quantities."
- Makes related findings.
COMMENTS
Geothermal is a form of renewable energy defined as heat energy from the earth. Geothermal resources are reservoirs of hot water that are naturally occurring or are manufactured to operate at varying temperatures and depths below the earth's surface. Wells, ranging from a few feet to several miles deep, can be drilled into underground reservoirs to tap steam and hot water that can be brought to the surface for use in electricity generation, direct heating, and industrial processes. The United States is the world's largest producer of geothermal electricity and California has the highest geothermal capacity of all states. "The Geysers" geothermal steam field, located within Lake, Mendocino, and Sonoma Counties, contains 349 out of California's 563 high-temperature geothermal wells within the state. Imperial County (including the Salton Sea) houses 194 of these wells, and the remaining 20 are located in Lassen, Modoc, and Mono Counties. California has installed 2,627 MW of geothermal nameplate capacity – accounting for 72% of the total geothermal plant capacity in the United States. Many of these geothermal resource areas are known to have been inhabited and visited by Native Americans for thousands of years prior to European settlement.
Under current law, a geothermal project is divided into two discrete components for purposes of CEQA. The "exploration" phase involves drilling one or more exploration wells at a given site to map out the subsurface environment and assess exactly where a new geothermal power plant should be located. The subsequent "geothermal field development" phase involves drilling the necessary injector and producer wells, building the power plant, grid connections, and associated infrastructure. This phase is much more complicated and expansive. Typically, a geothermal developer cannot move forward with geothermal field development until some level of exploration has taken place as they need to site the wells in precisely the right location to make sure they are getting enough heat to support power generation, and that information can only be ascertained through exploration.
In 2024, the U.S. Department of Interior adopted add a new categorical exclusion from the National Environmental Policy Act (NEPA) for geothermal resource confirmation activities on federal geothermal resource leases. According to the author, the new categorical exclusion was based on the Bureau of Land Management's (BLM) assessment that geothermal exploration projects, when completed under a high-bar environmental standard, have virtually no negative impacts to the environment.
This NEPA exclusion was adopted for use by BLM for projects on federal lands nationwide. Recent geothermal projects in Nevada and Utah are located on vast expanses of desert managed by BLM, with little potential for land use or environmental conflicts. BLM arrived at a 20 acre limit on total surface disturbance by looking back at the statistical details of 26 prior projects. Those 26 projects varied widely in well pad size and total disturbance, with 20 acres being the approximate median. The projects ranged from .08 acres (in New Mexico) to 143 acres (in Nevada). The 20-acre limit does not appear to be based on any particular environmental criteria and is not tailored to project or site characteristics.
In California, the geothermal resource potential is not necessarily on federal land, and exploratory and development projects are not necessarily subject to NEPA. Nonetheless, the CEQA exemption in this bill applies regardless of whether the project is on federal land or otherwise subject to NEPA review. Of the 26 projects examined by BLM, three were in California (two in Inyo County and one in Imperial County). One of the three was on federal land (Inyo National Forest near Mammoth Lakes), and all were under 20 acres.
According to the Author
AB 527 will accelerate the development of geothermal resources and advance California's climate goals by expediting exploratory well projects which have a de minimis impact. In order to gather essential subsurface data to determine the viability of a potential geothermal field, developers must drill exploratory wells. Currently, this exploratory endeavor is treated as a separate project, subject to its own environmental review process. The federal government has previously allowed latitude concerning exploratory wells. In October 2024, the Biden Administration proposed a categorical exclusion under NEPA for these de minimis exploration projects. AB 527 seeks to align California's approach with this federal exclusion, allowing carefully vetted exploratory geothermal projects to be exempt from CEQA. This alignment will eliminate redundant regulatory hurdles, ensuring projects move forward more quickly and efficiently bringing us that much closer to our renewable energy goals.
Arguments in Support
According to co-sponsor Fervo Energy, categorical exclusions for exploratory drilling projects that meet a high standard of environmental stewardship are critical to attracting geothermal developers to California. Developers must fully understand a site's subsurface characteristics to attract financing for a full and capital-intensive geothermal project. California's unique process largely precludes it from developer consideration, as it does not offer the same certainties in timeline and cost that other states can afford. By lowering barriers for developers to confirm their resources and initiate project financing, this bill would greatly improve the chances of attracting geothermal energy developers such as Fervo.
Arguments in Opposition
According to Defenders of Wildlife and other environmental organizations, this bill is unnecessary – while the background document mentions "perceived regulatory challenges" and discusses the competitive advantage that may shift siting to other states, there is no detailed information about any actual regulatory roadblocks to permitting geothermal exploration in California. In our experience, many of these projects go through lead agency review at the county level in a timely manner and with few challenges. Complying with California's robust environmental laws is critical to preserving our resources while developing energy projects.
FISCAL COMMENTS
According to the Assembly Appropriations Committee, (exempt geothermal exploratory well) projects may still trigger environmental review or require permits from one or more state agencies. For example, the bill expands the definition of geothermal exploratory project to include temporary roads and power lines. It is possible roads and other infrastructure crossing waterways will require a Lake and Streambed Alteration Agreement or an Incidental Take Permit from the Department of Fish and Wildlife (DFW), or a 401 Certification, Waste Discharge Requirement, or Construction General Permit from the State Water Resources Control Board (State Water Board) – which may impose conditions independent of CEQA. However, several of the agencies with relevant environmental review and permitting authority – such as DFW, State Water Board, Department of Conservation, California Energy Commission, and State Lands Commission – report they do not anticipate significant new or added costs or workload as a result of this bill.
VOTES
ASM NATURAL RESOURCES: 14-0-0
YES: Bryan, Alanis, Connolly, Ellis, Flora, Garcia, Haney, Hoover, Kalra, Muratsuchi, Pellerin, Schultz, Wicks, Zbur
ASM APPROPRIATIONS: 15-0-0
YES: Wicks, Sanchez, Arambula, Calderon, Caloza, Dixon, Elhawary, Fong, Mark González, Hart, Pacheco, Pellerin, Solache, Ta, Tangipa
UPDATED
VERSION: May 5, 2025
CONSULTANT: Lawrence Lingbloom / NAT. RES. / (916) 319-2092 FN: 0000434
Date of Hearing: May 14, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 527
Author:(Papan) – As Amended Ver:May 5, 2025
Policy Committee: | Natural Resources | Vote: | 14 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill exempts, until January 1, 2031, a geothermal exploratory project from the California Environmental Quality Act (CEQA) if a county is the lead agency and the project meets specified conditions.
Specifically, this bill, among other things:
1) Provides that CEQA does not apply to a geothermal exploratory project for which a county is the lead agency, if the lead agency determines that the project meets numerous specified conditions. For a more detailed summary of these conditions, please see the Assembly Natural Resources Committee’s analysis of this bill.
2) Authorizes the lead agency to require the project applicant to file an indemnity bond, as specified, before it makes its determination pursuant to item 1, above.
3) Requires the lead agency to post a written notice of the intent to apply the exemption on its website and at the project site at least 30 days before making a determination, as specified.
4) Provides that items 1, 2, and 3, above, sunset on January 1, 2031.
5) Expands the definition of a “geothermal exploratory project” to include equipment and activities necessary to establish interconnectivity between wells and reservoirs, temporary roads, electric distribution lines, and infrastructure to provide power for drilling and testing equipment. Deletes the requirement for wells included within a geothermal exploratory project to be located at least one-half mile from geothermal development wells that are capable of producing geothermal resources in commercial quantities.
FISCAL EFFECT:
While this bill exempts geothermal exploratory projects that meet specified conditions from CEQA, these projects may still trigger environmental review or require permits from one or more state agencies. For example, the bill expands the definition of geothermal exploratory project to include temporary roads and power lines. It is possible roads and other infrastructure crossing waterways will require a Lake and Streambed Alteration Agreement or an Incidental Take Permit from the Department of Fish and Wildlife (DFW), or a 401 Certification, Waste Discharge Requirement, or Construction General Permit from the State Water Resources Control Board (State Water Board) – which may impose conditions independent of CEQA. However, several of the agencies with relevant environmental review and permitting authority – such as DFW, State Water Board, Department of Conservation, California Energy Commission, and State Lands Commission – report they do not anticipate significant new or added costs or workload as a result of this bill.
COMMENTS:
1) Purpose. According to the author:
AB 527 will accelerate the development of geothermal resources and advance California's climate goals by expediting exploratory well projects which have a de minimis impact. In order to gather essential subsurface data to determine the viability of a potential geothermal field, developers must drill exploratory wells. Currently, this exploratory endeavor is treated as a separate project, subject to its own environmental review process. The federal government has previously allowed latitude concerning exploratory wells. In October 2024, the Biden Administration proposed a categorical exclusion under NEPA for these de minimis exploration projects. AB 527 seeks to align California’s approach with this federal exclusion, allowing carefully vetted exploratory geothermal projects to be exempt from CEQA.
2) Background. Geothermal resources are reservoirs of hot water that are naturally occurring or are manufactured to operate at varying temperatures and depths below the earth’s surface. Wells, ranging from a few feet to several miles deep, can be drilled into underground reservoirs to tap steam and hot water that can be brought to the surface for use in electricity generation, direct heating, and industrial processes. The United States is the world’s largest producer of geothermal electricity and California has the highest geothermal capacity of all states.
Under current law, a geothermal project is divided into two discrete components for purposes of CEQA. The “exploration” phase involves drilling one or more exploration wells at a given site to map out the subsurface environment and assess exactly where a new geothermal power plant should be located. The subsequent “field development” phase involves drilling the necessary injector and producer wells, building the power plant, grid connections, and associated infrastructure. The field development phase is much more complicated and expansive. Typically, a geothermal developer cannot move forward with field development until some level of exploration has taken place as the developer needs to site the wells in precisely the right location to make sure they are getting enough heat to support power generation. This information can only be ascertained through exploration.
In 2024, the U.S. Department of Interior added a new categorical exclusion from the National Environmental Policy Act for geothermal resource confirmation activities on federal geothermal resource leases. According to the author, the new categorical exclusion was based on the Bureau of Land Management’s assessment that geothermal exploration projects meeting a high standard of environmental stewardship have virtually no negative impacts to the environment.
Sonoma Clean Power, the sponsor of this bill, writes:
AB 527 will similarly create a narrow, targeted exemption from the California Environmental Quality Act (CEQA) - our equivalent to NEPA - to align with the federal exclusion. This legislation will also ensure that a geothermal exploration project benefitting from this exemption meets a very high standard of environmental protection, and will also mandate that all workers on the project be paid the prevailing wage.
By allowing the first phase of geothermal development to move forward significantly faster than what is allowed under current law, AB 527 will accelerate our state’s transition to clean energy and drive development of this much-needed resource here in California.
A coalition of environmental groups was opposed to a previous version of the bill. It is not clear if these groups remain opposed to the current version.
Analysis Prepared by: Nikita Koraddi / APPR. / (916) 319-2081
Date of Hearing: April 28, 2025
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Isaac G. Bryan, Chair
ABPCA Bill Id:AB 527 (
Author:Papan) – As Amended Ver:April 21, 2025
SUBJECT: California Environmental Quality Act: geothermal exploratory projects
SUMMARY: Establishes an exemption from the California Environmental Quality Act (CEQA) for geothermal exploratory projects, if a county is the lead agency and specified conditions are met, including full reclamation of the project site.
EXISTING LAW:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA. (Public Resources Code (PRC) 21000 et seq.)
- Provides that the Geologic Energy Management Division (CalGEM) shall be the CEQA lead agency for all geothermal exploratory projects. However, CalGEM is authorized to delegate its lead agency responsibility to a county that has adopted a geothermal element for its general plan. Requires a county to assume lead agency responsibility upon the request of a geothermal exploratory project applicant to the county and CalGEM. Requires a county lead agency to confer with CalGEM regarding necessary information that should be included in the environmental review for the project to facilitate CalGEM’s exercise of its authority as a responsible agency. (PRC 3715.5)
- Defines “geothermal exploratory project” as a project composed of not more than six wells and associated drilling and testing equipment, whose chief and original purpose is to evaluate the presence and characteristics of geothermal resources prior to commencement of a geothermal field development. Wells included within a geothermal exploratory project must be located at least one-half mile from geothermal development wells which are capable of producing geothermal resources in commercial quantities. (PRC 21065.5)
- Defines “geothermal field development project” as a development project composed of geothermal wells, resource transportation lines, production equipment, roads, and other facilities which are necessary to supply geothermal energy to any particular heat utilization equipment for its productive life, all within an area delineated by the applicant. (Government Code 65928.5)
THIS BILL:
- Provides that CEQA does not apply to a geothermal exploratory project for which a county is the lead agency, if the lead agency determines that the project meets all of the following conditions:
- The project does not include the production of geothermal resources in commercial quantities.
- The project does not disturb more than 20 acres of previously undisturbed ground.
- The project’s footprint does not include any of the following:
- Wetlands.
- Rivers, streams, or riparian corridors, except temporary road or electric distribution line crossings.
- Lands identified for conservation in an adopted natural community conservation plan, habitat conservation plan, or other adopted natural resource protection plan.
- Identified habitat for species of special status identified by state or federal agencies.
- Lands with a conservation easement unless determined consistent with the terms or requirements of the easement.
- Unusual circumstances do not exist that would cause the project to have a significant impact on the environment.
- The project site is not on the “Cortese List” (i.e., known contaminated sites).
- The project will not cause a substantial adverse change in the significance of a historical resource or a tribal cultural resource.
- The project includes full reclamation of all well pads, temporary routes, and other disturbances, including the reestablishment of vegetative cover with native plants, unless those disturbances are incorporated into a subsequent geothermal field development project.
- The project applicant has certified to the lead agency that either of the entirety of the project is a “public work” or all construction workers will be paid prevailing wages, as specified.
- Requires the lead agency to post a written notice of the intent to apply the exemption on its internet website and at the project site at least 30 days before making a determination to approve or carry out a change in use.
- Revises the definition of “geothermal exploratory project” to include “equipment and activities necessary to establish interconnectivity between wells and reservoirs, roads, electric distribution lines, and infrastructure to provide power for drilling and testing equipment” and eliminate the requirement that exploratory project wells must be “located at least one-half mile from geothermal development wells which are capable of producing geothermal resources in commercial quantities.”
- Makes related findings.
FISCAL EFFECT: Unknown
COMMENTS:
- Background. Geothermal is a form of renewable energy defined as heat energy from the earth. Geothermal resources are reservoirs of hot water that are naturally occurring or are manufactured to operate at varying temperatures and depths below the earth’s surface. Wells, ranging from a few feet to several miles deep, can be drilled into underground reservoirs to tap steam and hot water that can be brought to the surface for use in electricity generation, direct heating, and industrial processes. The United States is the world’s largest producer of geothermal electricity and California has the highest geothermal capacity of all states. “The Geysers” geothermal steam field, located within Lake, Mendocino, and Sonoma Counties, contains 349 out of California’s 563 high-temperature geothermal wells within the state. Imperial County (including the Salton Sea) houses 194 of these wells, and the remaining 20 are located in Lassen, Modoc, and Mono Counties. California has installed 2,627 MW of geothermal nameplate capacity – accounting for 72% of the total geothermal plant capacity in the United States. Many of these geothermal resource areas are known to have been inhabited and visited by Native Americans for thousands of years prior to European settlement.
Under current law, a geothermal project is divided into two discrete components for purposes of CEQA. The “exploration” phase involves drilling one or more exploration wells at a given site to map out the subsurface environment and assess exactly where a new geothermal power plant should be located. The subsequent “geothermal field development” phase involves drilling the necessary injector and producer wells, building the power plant, grid connections, and associated infrastructure. This phase is much more complicated and expansive. Typically, a geothermal developer cannot move forward with geothermal field development until some level of exploration has taken place as they need to site the wells in precisely the right location to make sure they are getting enough heat to support power generation, and that information can only be ascertained through exploration.
In 2024, the U.S. Department of Interior adopted add a new categorical exclusion from the National Environmental Policy Act (NEPA) for geothermal resource confirmation activities on federal geothermal resource leases. According to the author, the new categorical exclusion was based on the Bureau of Land Management’s (BLM) assessment that geothermal exploration projects, when completed under a high-bar environmental standard, have virtually no negative impacts to the environment.
- Author’s statement:
AB 527 will accelerate the development of geothermal resources and advance California's climate goals by expediting exploratory well projects which have a de minimis impact. In order to gather essential subsurface data to determine the viability of a potential geothermal field, developers must drill exploratory wells. Currently, this exploratory endeavor is treated as a separate project, subject to its own environmental review process. The federal government has previously allowed latitude concerning exploratory wells. In October 2024, the Biden Administration proposed a categorical exclusion under NEPA for these de minimis exploration projects. AB 527 seeks to align California’s approach with this federal exclusion, allowing carefully vetted exploratory geothermal projects to be exempt from CEQA. This alignment will eliminate redundant regulatory hurdles, ensuring projects move forward more quickly and efficiently bringing us that much closer to our renewable energy goals.
- Is the NEPA exclusion a useful template for California? The recently-adopted NEPA exclusion was adopted for use by BLM for projects on federal lands nationwide. Recent geothermal projects in Nevada and Utah are located on vast expanses of desert managed by BLM, with little potential for land use or environmental conflicts. BLM arrived at a 20 acre limit on total surface disturbance by looking back at the statistical details of 26 prior projects. Those 26 projects varied widely in well pad size and total disturbance, with 20 acres being the approximate median. The projects ranged from .08 acres (in New Mexico) to 143 acres (in Nevada). The 20-acre limit does not appear to be based on any particular environmental criteria and is not tailored to project or site characteristics.
In California, the geothermal resource potential is not necessarily on federal land, and exploratory and development projects are not necessarily subject to NEPA. Nonetheless, the CEQA exemption in this bill applies regardless of whether the project is on federal land or otherwise subject to NEPA review. Of the 26 projects examined by BLM, three were in California (two in Inyo County and one in Imperial County). One of the three was on federal land (Inyo National Forest near Mammoth Lakes), and all were under 20 acres. Grading 20 acres in the steep mountains of the Geysers geothermal area is a different proposition than 20 acres in flat Nevada or Utah desert.
- Bill expands the scope of geothermal exploratory projects. In addition to the exemption, this bill expands the definition of geothermal exploratory project, explicitly including roads and power lines, while also eliminating the prohibition on exploratory wells within one-half mile of existing commercial wells. Roads can be particularly impactful and difficult to reclaim to meet the bill’s promise of no permanent impacts on the environment. In addition, roads and other infrastructure crossing waterways will likely require a Lake and Streambed Alteration Agreement from the Department of Fish and Wildlife, which may impose conditions independent of CEQA.
To address concerns regarding the combination of increased scope and decreased environmental review, the author and the committee may wish to consider the following amendments:
- Replace the 20-acre disturbance limit with the 5-acre well pad limit in the prior (April 10) version of the bill.
- Require a 100 foot buffer from wetlands, rivers, streams, and conservation and habitat lands excluded from the exemption.
- Require the lead agency to confirm that the project applicant has filed an indemnity bond with CalGEM pursuant to PRC 3725, or with the lead agency, in a form and manner prescribed by the lead agency, in an amount sufficient to secure full reclamation of the project site.
- Require the lead agency to file a notice of exemption with the State Clearinghouse.
- Sunset January 1, 2031.
REGISTERED SUPPORT / OPPOSITION:
Support
Fervo Energy (co-sponsor)
International Union of Operating Engineers, Cal-Nevada Conference (co-sponsor)
Sonoma Clean Power (co-sponsor)
California Community Choice Association
California State Association of Electrical Workers
California State Pipe Trades Council
Citizens’ Climate Lobby Santa Rosa and North
City of Cloverdale
County of Sonoma
Eavor
Geothermal Rising
Northern Sonoma County Air Pollution Control District
Ormat Technologies
USGBC California
Western States Council Sheet Metal, Air, Rail and Transportation
XGS Energy
Opposition (unless amended)
Center for Biological Diversity
Defenders of Wildlife
Mount Shasta Bioregional Ecology Center
Planning and Conservation League
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
Discussed in Hearing
Assembly Floor
Senate Floor
Senate Standing Committee on Appropriations
Senate Standing Committee on Natural Resources and Water
Senate Standing Committee on Environmental Quality
Assembly Floor
Assembly Standing Committee on Natural Resources
Bill Author
Bill Co-Author(s):