AB 660: Planning and Zoning Law: postentitlement phase permits: Housing Accountability Act.
- Session Year: 2025-2026
- House: Assembly
- Latest Version Date: 2025-07-17
Current Status:
In Progress
(2025-08-29: In committee: Held under submission.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
(1)The Planning and Zoning Law requires a local agency, as defined, to compile one or more lists that specify in detail the information required from any applicant for a postentitlement phase permit, as defined. Existing law also establishes time limits for completing reviews regarding whether an application for a postentitlement phase permit is complete and compliant, and whether to approve or deny an application. If a local agency finds that a complete application is noncompliant, existing law requires the local agency to provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within specified time limits. Existing law requires the time limits to be tolled, if the local agency requires review of the application by an outside entity, until the outside entity completes the review and returns the application to the local agency, as specified.
This bill would prohibit the local agency from requiring or requesting more than 2 plan check and specification reviews in connection with an application for a building permit, as part of its review, except as specified. The bill would authorize a local agency to deny an application that is not compliant with the permit standards following 2 submittals. plan check and specification reviews. The bill would also authorize an applicant to request additional submittals of applications that are not compliant with the permit standards. The bill, if a local agency finds that a complete application is noncompliant, would prohibit a local agency from requesting or requiring any action or inaction as a result of a building inspection undertaken to assess compliance with the applicable building permit standards that would represent a deviation from a previously approved building plan or similar approval for the building permit, except as specified. The
This bill would remove the above-described tolling requirements relating to outside entity reviews. reviews and, instead, would require, if federal or state law requires review of the application by another public agency that is independent of the local agency before the local agency is authorized to act on the application, the time limits to be tolled for the application until the public agency completes the review and returns the application to the local agency. The bill would require the local agency to notify the applicant, within 3 business days of the start of the tolling and within 3 business days of the resumption of the time limit, of the tolling and the resumption of the time limit, respectively.
(2)Existing law, if a postentitlement phase permit is determined to be incomplete or noncompliant, requires a local agency to provide a process for an applicant to appeal that decision in writing to the governing body of the agency or, if there is no governing body, to the director of the agency, as provided by that agency. Existing law requires the city or county to provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
Existing law requires a local agency to provide a final written determination on the appeal not later than 60 business days after receipt of the applicants written appeal, for housing development projects with 25 units or fewer, and not later than 90 business days for a housing development projects with 26 units or more. Existing law also specifies that the fact that an appeal is permitted to both the planning commission and to the governing body does not extend the specified time period.
This bill would revise those timelines to not later than 30 business days for housing development projects with 25 units or fewer and 45 business days for housing development projects with 26 units or more. The bill would remove the specification that the fact that an appeal is permitted to both the planning commission and to the governing body does not extend the specified time period. The bill would remove the requirement that, if a postentitlement phase permit is determined to be incomplete or noncompliant, a local agency provide a process for an applicant to appeal that decision to the director of the agency if there is no governing body, as provided by that agency. The bill would remove the requirement that a city or county provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
This bill would authorize the applicant to seek a writ of mandate to compel approval of the application, if the applicants appeal pursuant to this subdivision is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required.
By imposing additional duties on local agencies regarding postentitlement phase permits, the bill would impose a state-mandated local program.
(3)Existing law, the Housing Accountability Act, among other things, prohibits a local agency from disapproving, or conditioning approval in a manner that renders infeasible, a housing development project for very low, low-, or moderate-income households unless the local agency makes written findings as to one of certain sets of conditions, as specified. The act also requires, when a proposed housing development project complies with applicable, objective general plan, zoning, and subdivision standards and criteria in effect at the time that the application was deemed complete, but the local agency proposes to disapprove the project or to impose a condition that the project be developed at a lower density, that the local agency base its decision regarding the proposed housing development project upon written findings supported by a preponderance of the evidence on the record that 2 specified conditions exist. Existing law defines the term disapprove the housing development project for these purposes to include any instance in which a local agency takes certain actions or fails to comply with certain requirements, including the time limits described above. Existing law makes a local agencys failure to meet the above-described time limits relating to postentitlement phase permits a violation of the Housing Accountability Act.
This bill would, instead, make a violation of the above-described provisions relating to postentitlement phase permits, among others, a violation of the Housing Accountability Act. The bill would also revise the definition of disapprove the housing development project under the Housing Accountability Act to include any instance in which a local agency fails to comply with any of the provisions described above relating to postentitlement phase permits. By requiring local agencies to take certain actions, this bill would impose a state-mandated local program.
(4)The bill would make other conforming changes and would provide that certain changes are declaratory of existing law.
(5)The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.
(6)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)The Planning and Zoning Law requires a local agency, as defined, to compile one or more lists that specify in detail the information required from any applicant for a postentitlement phase permit, as defined. Existing law also establishes time limits for completing reviews regarding whether an application for a postentitlement phase permit is complete and compliant, and whether to approve or deny an application. If a local agency finds that a complete application is noncompliant, existing law requires the local agency to provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within specified time limits. Existing law requires the time limits to be tolled, if the local agency requires review of the application by an outside entity, until the outside entity completes the review and returns the application to the local agency, as specified.
This bill would prohibit the local agency from requiring or requesting more than 2 plan check and specification reviews in connection with an application for a building permit, as part of its review, except as specified. The bill would authorize a local agency to deny an application that is not compliant with the permit standards following 2 submittals. The bill would also authorize an applicant to request additional submittals of applications that are not compliant with the permit standards. The bill, if a local agency finds that a complete application is noncompliant, would prohibit a local agency from requesting or requiring any action or inaction as a result of a building inspection undertaken to assess compliance with the applicable building permit standards that would represent a deviation from a previously approved building plan or similar approval for the building permit, except as specified. The bill would remove the above-described tolling requirements relating to outside entity reviews.
(2)Existing law, if a postentitlement phase permit is determined to be incomplete or noncompliant, requires a local agency to provide a process for an applicant to appeal that decision in writing to the governing body of the agency or, if there is no governing body, to the director of the agency, as provided by that agency. Existing law requires the city or county to provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
Existing law requires a local agency to provide a final written determination on the appeal not later than 60 business days after receipt of the applicants written appeal, for housing development projects with 25 units or fewer, and not later than 90 business days for a housing development projects with 26 units or more. Existing law also specifies that the fact that an appeal is permitted to both the planning commission and to the governing body does not extend the specified time period.
This bill would revise those timelines to not later than 30 business days for housing development projects with 25 units or fewer and 45 business days for housing development projects with 26 units or more. The bill would remove the specification that the fact that an appeal is permitted to both the planning commission and to the governing body does not extend the specified time period. The bill would remove the requirement that, if a postentitlement phase permit is determined to be incomplete or noncompliant, a local agency provide a process for an applicant to appeal that decision to the director of the agency if there is no governing body, as provided by that agency. The bill would remove the requirement that a city or county provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
This bill would authorize the applicant to seek a writ of mandate to compel approval of the application, if the applicants appeal pursuant to this subdivision is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required. The bill would require the writ of mandate to be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
By imposing additional duties on local agencies regarding postentitlement phase permits, the bill would impose a state-mandated local program.
(3)Existing law, the Housing Accountability Act, among other things, prohibits a local agency from disapproving, or conditioning approval in a manner that renders infeasible, a housing development project for very low, low-, or moderate-income households unless the local agency makes written findings as to one of certain sets of conditions, as specified. The act also requires, when a proposed housing development project complies with applicable, objective general plan, zoning, and subdivision standards and criteria in effect at the time that the application was deemed complete, but the local agency proposes to disapprove the project or to impose a condition that the project be developed at a lower density, that the local agency base its decision regarding the proposed housing development project upon written findings supported by a preponderance of the evidence on the record that 2 specified conditions exist. Existing law defines the term disapprove the housing development project for these purposes to include any instance in which a local agency takes certain actions or fails to comply with certain requirements, including the time limits described above. Existing law makes a local agencys failure to meet the above-described time limits relating to postentitlement phase permits a violation of the Housing Accountability Act.
This bill would, instead, make a violation of the above-described provisions relating to postentitlement phase permits, among others, a violation of the Housing Accountability Act. The bill would also revise the definition of disapprove the housing development project under the Housing Accountability Act to include any instance in which a local agency fails to comply with any of the provisions described above relating to postentitlement phase permits. By requiring local agencies to take certain actions, this bill would impose a state-mandated local program.
(4)The bill would make other conforming changes and would provide that certain changes are declaratory of existing law.
(5)The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.
(6)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)The Planning and Zoning Law requires a local agency, as defined, to compile one or more lists that specify in detail the information required from any applicant for a postentitlement phase permit, as defined. Existing law also establishes time limits for completing reviews regarding whether an application for a postentitlement phase permit is complete and compliant, and whether to approve or deny an application. If a local agency finds that a complete application is noncompliant, existing law requires the local agency to provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within specified time limits. Existing law requires the time limits to be tolled, if the local agency requires review of the application by an outside entity, until the outside entity completes the review and returns the application to the local agency, as specified.
This bill would prohibit the local agency from requiring or requesting more than 2 plan check and specification reviews in connection with an application for a building permit, as part of its review, except as specified. The bill, if a local agency finds that a complete application is noncompliant, would prohibit a local agency from requesting or requiring any action or inaction as a result of a building inspection undertaken to assess compliance with the applicable building permit standards that would represent a deviation from a previously approved building plan or similar approval for the building permit, except as specified. The bill would remove the above-described tolling requirements relating to outside entity reviews.
(2)Existing law, if a postentitlement phase permit is determined to be incomplete or noncompliant, requires a local agency to provide a process for an applicant to appeal that decision in writing to the governing body of the agency or, if there is no governing body, to the director of the agency, as provided by that agency. Existing law requires the city or county to provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
Existing law requires a local agency to provide a final written determination on the appeal not later than 60 business days after receipt of the applicants written appeal, for housing development projects with 25 units or fewer, and not later than 90 business days for a housing development projects with 26 units or more. Existing law also specifies that the fact that an appeal is permitted to both the planning commission and to the governing body does not extend the specified time period.
This bill would revise those timelines to not later than 30 business days for housing development projects with 25 units or fewer and 45 business days for housing development projects with 26 units or more. The bill would remove the specification that the fact that an appeal is permitted to both the planning commission and to the governing body does not extend the specified time period. The bill would remove the requirement that a city or county provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
This bill would authorize the applicant to seek a writ of mandate to compel approval of the application, if the applicants appeal pursuant to this subdivision is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required. The bill would require the writ of mandate to be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
By imposing additional duties on local agencies regarding postentitlement phase permits, the bill would impose a state-mandated local program.
(3)Existing law, the Housing Accountability Act, among other things, prohibits a local agency from disapproving, or conditioning approval in a manner that renders infeasible, a housing development project for very low, low-, or moderate-income households unless the local agency makes written findings as to one of certain sets of conditions, as specified. The act also requires, when a proposed housing development project complies with applicable, objective general plan, zoning, and subdivision standards and criteria in effect at the time that the application was deemed complete, but the local agency proposes to disapprove the project or to impose a condition that the project be developed at a lower density, that the local agency base its decision regarding the proposed housing development project upon written findings supported by a preponderance of the evidence on the record that 2 specified conditions exist. Existing law defines the term disapprove the housing development project for these purposes to include any instance in which a local agency takes certain actions or fails to comply with certain requirements, including the time limits described above. Existing law makes a local agencys failure to meet the above-described time limits relating to postentitlement phase permits a violation of the Housing Accountability Act.
This bill would, instead, make a violation of the above-described provisions relating to postentitlement phase permits, among others, a violation of the Housing Accountability Act. The bill would also revise the definition of disapprove the housing development project under the Housing Accountability Act to include any instance in which a local agency fails to comply with any of the provisions described above relating to postentitlement phase permits. By requiring local agencies to take certain actions, this bill would impose a state-mandated local program.
(4)The bill would make other conforming changes and would provide that certain changes are declaratory of existing law.
(5)The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.
(6)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)The Planning and Zoning Law requires a local agency, as defined, to compile one or more lists that specify in detail the information required from any applicant for a postentitlement phase permit, as defined. Existing law also establishes time limits for completing reviews regarding whether an application for a postentitlement phase permit is complete and compliant, and whether to approve or deny an application. If a local agency finds that a complete application is noncompliant, existing law requires the local agency to provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within specified time limits. Existing law requires the time limits to be tolled, if the local agency requires review of the application by an outside entity, until the outside entity completes the review and returns the application to the local agency, as specified.
This bill would prohibit the local agency from requiring or requesting more than 2 plan check and specification reviews in connection with an application for a building permit, as part of its review, except as specified. The bill, if a local agency finds that a complete application is noncompliant, would prohibit a local agency from requesting or requiring any action or inaction as a result of a site building inspection undertaken to assess compliance with the applicable building permit standards that would represent a deviation from a previously approved building plan or similar approval for the project, building permit, except as specified. The bill would remove the above-described tolling requirements relating to outside entity reviews.
(2)Existing law, if a postentitlement phase permit is determined to be incomplete or noncompliant, requires a local agency to provide a process for an applicant to appeal that decision in writing to the governing body of the agency or, if there is no governing body, to the director of the agency, as provided by that agency. Existing law requires the city or county to provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
Existing law requires a local agency to provide a final written determination on the appeal not later than 60 business days after receipt of the applicants written appeal, for housing development projects with 25 units or fewer, and not later than 90 business days for a housing development projects with 26 units or more. Existing law also specifies that the fact that an appeal is permitted to both the planning commission and to the governing body does not extend the specified time period.
This bill would revise those timelines to not later than 30 business days for housing development projects with 25 units or fewer and 45 business days for housing development projects with 26 units or more. The bill would remove the specification that the fact that an appeal is permitted to both the planning commission and to the governing body does not extend the specified time period. The bill would remove the requirement that a city or county provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
This bill would authorize the applicant to seek a writ of mandate to compel approval of the application, if the applicants appeal pursuant to this subdivision is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required. The bill would require the writ of mandate to be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
By imposing additional duties on local agencies regarding postentitlement phase permits, the bill would impose a state-mandated local program.
(3)Existing law makes a local agencys failure to meet the above-described time limits relating to postentitlement phase permits a violation of the Housing Accountability Act.
This bill would, instead, make a violation of the above-described provisions relating to postentitlement phase permits, among others, a violation of the Housing Accountability Act.
(4)Existing law requires a special district that receives an application from a housing development project for service from a special district or an application from a housing development project for a postentitlement phase permit, as specified, to provide written notice to the applicant of the next steps in the review process, including, but not limited to, any additional information that may be required to begin to review the application for service or approval. Existing law requires the special district to provide this notice within 30 business days of receipt of the application for a housing development with 25 units or fewer, and within 60 business days for a housing development with 26 units or more. This bill would authorize an applicant to provide a written response to the special district notifying the special district that the applicant believes that it has submitted all of the legally required information for the application to be considered and that the application is compliant with the applicable standards for approval of the application, if the applicant receives a notice from the special district requesting additional information. If the special district does not approve the application within 30 days of receiving the notice, the bill would authorize the applicant to seek a writ of mandate to compel approval of the application. The bill would require the writ of mandate to be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards. By imposing additional duties on special districts, the bill would impose a state-mandated local program.(5)(4)The bill would make other conforming changes and would provide that certain changes are declaratory of existing law.
(6)(5)The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.
(7)(6)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)The Planning and Zoning Law requires a local agency, as defined, to compile one or more lists that specify in detail the information required from any applicant for a postentitlement phase permit, as defined. Existing law also establishes time limits for completing reviews regarding whether an application for a postentitlement phase permit is complete and compliant, and whether to approve or deny an application. If a local agency finds that a complete application is noncompliant, existing law requires the local agency to provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within specified time limits. Existing law requires the time limits to be tolled, if the local agency requires review of the application by an outside entity, until the outside entity completes the review and returns the application to the local agency, as specified.
This bill would prohibit the local agency from requiring or requesting more than 2 plan check and specification reviews in connection with an application for a building permit, as part of its review. If the local agency fails to make a determination about whether housing development project applications are compliant within specified timeframes contract after the application is deemed complete, the bill would authorize the applicant to contract with or employ a licensed professional engineer or architect to check the plans and specifications for compliance with the permit standards at the applicants own expense. This review, except as specified. The bill, if a local agency finds that a complete application is noncompliant, would prohibit a local agency from requesting or requiring any action or inaction as a result of a site inspection that would represent a deviation from a previously approved plan or similar approval for the project, except as specified. The bill would remove the above-described tolling requirements. requirements relating to outside entity reviews.
(2)Existing law, if a postentitlement phase permit is determined to be incomplete or noncompliant, requires a local agency to provide a process for an applicant to appeal that decision in writing to the governing body of the agency or, if there is no governing body, to the director of the agency, as provided by that agency. Existing law requires the city or county to provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
Existing law requires a local agency to provide a final written determination on the appeal not later than 60 business days after receipt of the applicants written appeal, for housing development projects with 25 units or fewer, and not later than 90 business days for a housing development projects with 26 units or more. Existing law also specifies that the fact that an appeal is permitted to both the planning commission and to the governing body does not extend the specified time period.
This bill would revise those timelines to not later than 15 30 business days for housing development projects with 25 units or fewer and 30 45 business days for housing development projects with 26 units or more. The bill would remove the specification that the fact that an appeal is permitted to both the planning commission and to the governing body does not extend the specified time period. The bill would remove the requirement that a city or county provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
This bill would authorize the applicant to seek a writ of mandate to compel approval of the application, if the applicants appeal pursuant to this subdivision is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required. The bill would require the writ of mandate to be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
By imposing additional duties on local agencies regarding postentitlement phase permits, the bill would impose a state-mandated local program.
(3)Existing law makes a local agencys failure to meet the above-described time limits relating to postentitlement phase permits a violation of the Housing Accountability Act.
This bill would, instead, make a violation of the above-described provisions relating to postentitlement phase permits, among others, a violation of the Housing Accountability Act.
(4)Existing law requires a special district that receives an application from a housing development project for service from a special district or an application from a housing development project for a postentitlement phase permit, as specified, to provide written notice to the applicant of the next steps in the review process, including, but not limited to, any additional information that may be required to begin to review the application for service or approval. Existing law requires the special district to provide this notice within 30 business days of receipt of the application for a housing development with 25 units or fewer, and within 60 business days for a housing development with 26 units or more.
This bill would authorize an applicant to provide a written response to the special district notifying the special district that the applicant believes that it has submitted all of the legally required information for the application to be considered and that the application is compliant with the applicable standards for approval of the application, if the applicant receives a notice from the special district requesting additional information. If the special district does not approve the application within 15 30 days of receiving the notice, the bill would authorize the applicant to seek a writ of mandate to compel approval of the application. The bill would require the writ of mandate to be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards. By imposing additional duties on special districts, the bill would impose a state-mandated local program.
(5)The bill would make other conforming changes and would provide that certain changes are declaratory of existing law.
(6)The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.
(7)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)The Planning and Zoning Law requires a local agency, as defined, to compile one or more lists that specify in detail the information required from any applicant for a postentitlement phase permit, as defined. Existing law also establishes time limits for completing reviews regarding whether an application for a postentitlement phase permit is complete and compliant, and whether to approve or deny an application. If a local agency finds that a complete application is noncompliant, existing law requires the local agency to provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within specified time limits. Existing law requires the time limits to be tolled, if the local agency requires review of the application by an outside entity, until the outside entity completes the review and returns the application to the local agency, as specified.
This bill would prohibit the local agency from requiring or requesting more than 2 plan check and specification reviews in connection with an application for a building permit, as part of its review. If the local agency fails to make a determination about whether housing development project applications are compliant within specified timeframes contract after the application is deemed complete, the bill would authorize the applicant to contract with or employ a licensed professional engineer or architect to check the plans and specifications for compliance with the permit standards at the applicants own expense. This bill would remove the above-described tolling requirements.
(2)Existing law, if a postentitlement phase permit is determined to be incomplete or noncompliant, requires a local agency to provide a process for an applicant to appeal that decision in writing to the governing body of the agency or, if there is no governing body, to the director of the agency, as provided by that agency. Existing law requires the city or county to provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
Existing law requires a local agency to provide a final written determination on the appeal not later than 60 business days after receipt of the applicants written appeal, for housing development projects with 25 units or fewer, and not later than 90 business days for a housing development projects with 26 units or more. Existing law also specifies that the fact that an appeal is permitted to both the planning commission and to the governing body does not extend the specified time period.
This bill would revise those timelines to not later than 15 business days for housing development projects with 25 units or fewer and 30 business days for housing development projects with 26 units or more. The bill would remove the specification that the fact that an appeal is permitted to both the planning commission and to the governing body does not extend the specified time period. The bill would remove the requirement that a city or county provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
This bill would authorize the applicant to seek a writ of mandate to compel approval of the application, if the applicants appeal pursuant to this subdivision is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required. The bill would require the writ of mandate to be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
By imposing additional duties on local agencies regarding postentitlement phase permits, the bill would impose a state-mandated local program.
(3)Existing law makes a local agencys failure to meet the above-described time limits relating to postentitlement phase permits a violation of the Housing Accountability Act.
This bill would, instead, make a violation of the above-described provisions relating to postentitlement phase permits, among others, a violation of the Housing Accountability Act.
(4)Existing law requires a special district that receives an application from a housing development project for service from a special district or an application from a housing development project for a postentitlement phase permit, as specified, to provide written notice to the applicant of the next steps in the review process, including, but not limited to, any additional information that may be required to begin to review the application for service or approval. Existing law requires the special district to provide this notice within 30 business days of receipt of the application for a housing development with 25 units or fewer, and within 60 business days for a housing development with 26 units or more.
This bill would authorize an applicant to provide a written response to the special district notifying the special district that the applicant believes that it has submitted all of the legally required information for the application to be considered and that the application is compliant with the applicable standards for approval of the application, if the applicant receives a notice from the special district requesting additional information. If the special district does not approve the application within 15 days of receiving the notice, the bill would authorize the applicant to seek a writ of mandate to compel approval of the application. The bill would require the writ of mandate to be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards. By imposing additional duties on special districts, the bill would impose a state-mandated local program.
(5)The bill would make other conforming changes and would provide that certain changes are declaratory of existing law.
(6)The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.
(7)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The Planning and Zoning Law requires a local agency, as defined, to compile one or more lists that specify in detail the information required from any applicant for a postentitlement phase permit, as defined. Existing law also establishes time limits for completing reviews regarding whether an application for a postentitlement phase permit is complete and compliant, and whether to approve or deny an application. If a local agency finds that a complete application is noncompliant, existing law requires the local agency to provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within specified time limits. This bill would declare the intent of the Legislature to enact subsequent legislation that amends provisions of the Planning and Zoning Law related to housing development approvals, as specified, to further expedite the residential development process by strengthening provisions governing postentitlement phase permits.The Planning and Zoning Law requires a local agency, as defined, to compile one or more lists that specify in detail the information required from any applicant for a postentitlement phase permit, as defined. Existing law also establishes time limits for completing reviews regarding whether an application for a postentitlement phase permit is complete and compliant, and whether to approve or deny an application. If a local agency finds that a complete application is noncompliant, existing law requires the local agency to provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within specified time limits.
This bill would declare the intent of the Legislature to enact subsequent legislation that amends provisions of the Planning and Zoning Law related to housing development approvals, as specified, to further expedite the residential development process by strengthening provisions governing postentitlement phase permits.
(a)(1)The Legislature finds and declares all of the following:
(A)The lack of housing, including emergency shelters, is a critical problem that threatens the economic, environmental, and social quality of life in California.
(B)California housing has become the most expensive in the nation. The excessive cost of the states housing supply is partially caused by activities and policies of many local governments that limit the approval of housing, increase the cost of land for housing, and require that high fees and exactions be paid by producers of housing.
(C)Among the consequences of those actions are discrimination against low-income and minority households, lack of housing to support employment growth, imbalance in jobs and housing, reduced mobility, urban sprawl, excessive commuting, and air quality deterioration.
(D)Many local governments do not give adequate attention to the economic, environmental, and social costs of decisions that result in disapproval of housing development projects, reduction in density of housing projects, and excessive standards for housing development projects.
(2)In enacting the amendments made to this section by the act adding this paragraph, the Legislature further finds and declares the following:
(A)California has a housing supply and affordability crisis of historic proportions. The consequences of failing to effectively and aggressively confront this crisis are hurting millions of Californians, robbing future generations of the chance to call California home, stifling economic opportunities for workers and businesses, worsening poverty and homelessness, and undermining the states environmental and climate objectives.
(B)While the causes of this crisis are multiple and complex, the absence of meaningful and effective policy reforms to significantly enhance the approval and supply of housing affordable to Californians of all income levels is a key factor.
(C)The crisis has grown so acute in California that supply, demand, and affordability fundamentals are characterized in the negative: underserved demands, constrained supply, and protracted unaffordability.
(D)According to reports and data, California has accumulated an unmet housing backlog of nearly 2,000,000 units and must provide for at least 180,000 new units annually to keep pace with growth through 2025.
(E)Californias overall home ownership rate is at its lowest level since the 1940s. The state ranks 49th out of the 50 states in home ownership rates as well as in the supply of housing per capita. Only one-half of Californias households are able to afford the cost of housing in their local regions.
(F)Lack of supply and rising costs are compounding inequality and limiting advancement opportunities for many Californians.
(G)The majority of California renters, more than 3,000,000 households, pay more than 30 percent of their income toward rent and nearly one-third, more than 1,500,000 households, pay more than 50 percent of their income toward rent.
(H)When Californians have access to safe and affordable housing, they have more money for food and health care; they are less likely to become homeless and in need of government-subsidized services; their children do better in school; and businesses have an easier time recruiting and retaining employees.
(I)An additional consequence of the states cumulative housing shortage is a significant increase in greenhouse gas emissions caused by the displacement and redirection of populations to states with greater housing opportunities, particularly working- and middle-class households. Californias cumulative housing shortfall therefore has not only national but international environmental consequences.
(J)Californias housing picture has reached a crisis of historic proportions despite the fact that, for decades, the Legislature has enacted numerous statutes intended to significantly increase the approval, development, and affordability of housing for all income levels, including this section.
(K)The Legislatures intent in enacting this section in 1982 and in expanding its provisions since then was to significantly increase the approval and construction of new housing for all economic segments of Californias communities by meaningfully and effectively curbing the capability of local governments to deny, reduce the density for, or render infeasible housing development projects and emergency shelters. That intent has not been fulfilled.
(L)It is the policy of the state that this section be interpreted and implemented in a manner to afford the fullest possible weight to the interest of, and the approval and provision of, housing.
(3)It is the intent of the Legislature that the conditions that would have a specific, adverse impact upon the public health and safety, as described in paragraph (2) of subdivision (d) and paragraph (1) of subdivision (j), arise infrequently.
(4)It is the intent of the Legislature that the amendments removing provisions from subparagraphs (D) and (E) of paragraph (6) of subdivision (h) and adding those provisions to Sections 65589.5.1 and 65589.5.2 by Assembly Bill 1413 (2023), insofar as they are substantially the same as existing law, shall be considered restatements and continuations of existing law, and not new enactments.
(b)It is the policy of the state that a local government not reject or make infeasible housing development projects, including emergency shelters, that contribute to meeting the need determined pursuant to this article without a thorough analysis of the economic, social, and environmental effects of the action and without complying with subdivision (d).
(c)The Legislature also recognizes that premature and unnecessary development of agricultural lands for urban uses continues to have adverse effects on the availability of those lands for food and fiber production and on the economy of the state. Furthermore, it is the policy of the state that development should be guided away from prime agricultural lands; therefore, in implementing this section, local jurisdictions should encourage, to the maximum extent practicable, in filling existing urban areas.
(d)For a housing development project for very low, low-, or moderate-income households, or an emergency shelter, a local agency shall not disapprove the housing development project or emergency shelter, or condition approval in a manner that renders the housing development project or emergency shelter infeasible, including through the use of design review standards, unless it makes written findings, based upon a preponderance of the evidence in the record, as to one of the following:
(1)The jurisdiction has adopted a housing element pursuant to this article that has been revised in accordance with Section 65588, is in substantial compliance with this article, and the jurisdiction has met or exceeded its share of the regional housing need allocation pursuant to Section 65584 for the planning period for the income category proposed for the housing development project, provided that any disapproval or conditional approval shall not be based on any of the reasons prohibited by Section 65008. If the housing development project includes a mix of income categories, and the jurisdiction has not met or exceeded its share of the regional housing need for one or more of those categories, then this paragraph shall not be used to disapprove or conditionally approve the housing development project. The share of the regional housing need met by the jurisdiction shall be calculated consistently with the forms and definitions that may be adopted by the Department of Housing and Community Development pursuant to Section 65400. In the case of an emergency shelter, the jurisdiction shall have met or exceeded the need for emergency shelter, as identified pursuant to paragraph (7) of subdivision (a) of Section 65583. Any disapproval or conditional approval pursuant to this paragraph shall be in accordance with applicable law, rule, or standards.
(2)The housing development project or emergency shelter as proposed would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact without rendering the development unaffordable to low- and moderate-income households or rendering the development of the emergency shelter financially infeasible. As used in this paragraph, a specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete. The following shall not constitute a specific, adverse impact upon the public health or safety:
(A)Inconsistency with the zoning ordinance or general plan land use designation.
(B)The eligibility to claim a welfare exemption under subdivision (g) of Section 214 of the Revenue and Taxation Code.
(3)The denial of the housing development project or imposition of conditions is required in order to comply with specific state or federal law, and there is no feasible method to comply without rendering the development unaffordable to low- and moderate-income households or rendering the development of the emergency shelter financially infeasible.
(4)The housing development project or emergency shelter is proposed on land zoned for agriculture or resource preservation that is surrounded on at least two sides by land being used for agricultural or resource preservation purposes, or which does not have adequate water or wastewater facilities to serve the project.
(5)On the date an application for the housing development project or emergency shelter was deemed complete, the jurisdiction had adopted a revised housing element that was in substantial compliance with this article, and the housing development project or emergency shelter was inconsistent with both the jurisdictions zoning ordinance and general plan land use designation as specified in any element of the general plan.
(A)This paragraph shall not be utilized to disapprove or conditionally approve a housing development project proposed on a site, including a candidate site for rezoning, that is identified as suitable or available for very low, low-, or moderate-income households in the jurisdictions housing element if the housing development project is consistent with the density specified in the housing element, even though the housing development project was inconsistent with both the jurisdictions zoning ordinance and general plan land use designation on the date the application was deemed complete.
(B)If the local agency has failed to identify a zone or zones where emergency shelters are allowed as a permitted use without a conditional use or other discretionary permit, has failed to demonstrate that the identified zone or zones include sufficient capacity to accommodate the need for emergency shelter identified in paragraph (7) of subdivision (a) of Section 65583, or has failed to demonstrate that the identified zone or zones can accommodate at least one emergency shelter, as required by paragraph (4) of subdivision (a) of Section 65583, then this paragraph shall not be utilized to disapprove or conditionally approve an emergency shelter proposed for a site designated in any element of the general plan for industrial, commercial, or multifamily residential uses. In any action in court, the burden of proof shall be on the local agency to show that its housing element does satisfy the requirements of paragraph (4) of subdivision (a) of Section 65583.
(6)On the date an application for the housing development project or emergency shelter was deemed complete, the jurisdiction did not have an adopted revised housing element that was in substantial compliance with this article and the housing development project is not a builders remedy project.
(e)Nothing in this section shall be construed to relieve the local agency from complying with the congestion management program required by Chapter 2.6 (commencing with Section 65088) of Division 1 of Title 7 or the California Coastal Act of 1976 (Division 20 (commencing with Section 30000) of the Public Resources Code). Neither shall anything in this section be construed to relieve the local agency from making one or more of the findings required pursuant to Section 21081 of the Public Resources Code or otherwise complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(f)(1)Except as provided in paragraphs (6) and (8) of this subdivision, and subdivision (o), nothing in this section shall be construed to prohibit a local agency from requiring the housing development project to comply with objective, quantifiable, written development standards, conditions, and policies appropriate to, and consistent with, meeting the jurisdictions share of the regional housing need pursuant to Section 65584. However, the development standards, conditions, and policies shall be applied to facilitate and accommodate development at the density permitted on the site and proposed by the development. Nothing in this section shall limit a projects eligibility for a density bonus, incentive, or concession, or waiver or reduction of development standards and parking ratios, pursuant to Section 65915.
(2)Except as provided in subdivision (o), nothing in this section shall be construed to prohibit a local agency from requiring an emergency shelter project to comply with objective, quantifiable, written development standards, conditions, and policies that are consistent with paragraph (4) of subdivision (a) of Section 65583 and appropriate to, and consistent with, meeting the jurisdictions need for emergency shelter, as identified pursuant to paragraph (7) of subdivision (a) of Section 65583. However, the development standards, conditions, and policies shall be applied by the local agency to facilitate and accommodate the development of the emergency shelter project.
(3)Except as provided in subdivision (o), nothing in this section shall be construed to prohibit a local agency from imposing fees and other exactions otherwise authorized by law that are essential to provide necessary public services and facilities to the housing development project or emergency shelter.
(4)For purposes of this section, a housing development project or emergency shelter shall be deemed consistent, compliant, and in conformity with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision if there is substantial evidence that would allow a reasonable person to conclude that the housing development project or emergency shelter is consistent, compliant, or in conformity.
(5)For purposes of this section, a change to the zoning ordinance or general plan land use designation subsequent to the date the application was deemed complete shall not constitute a valid basis to disapprove or condition approval of the housing development project or emergency shelter.
(6)Notwithstanding paragraphs (1) to (5), inclusive, all of the following apply to a housing development project that is a builders remedy project:
(A)A local agency may only require the project to comply with the objective, quantifiable, written development standards, conditions, and policies that would have applied to the project had it been proposed on a site with a general plan designation and zoning classification that allow the density and unit type proposed by the applicant. If the local agency has no general plan designation or zoning classification that would have allowed the density and unit type proposed by the applicant, the development proponent may identify any objective, quantifiable, written development standards, conditions, and policies associated with a different general plan designation or zoning classification within that jurisdiction, that facilitate the projects density and unit type, and those shall apply.
(B)(i)Except as authorized by paragraphs (1) to (4), inclusive, of subdivision (d), a local agency shall not apply any individual or combination of objective, quantifiable, written development standards, conditions, and policies to the project that do any of the following:
(I)Render the project infeasible.
(II)Preclude a project that meets the requirements allowed to be imposed by subparagraph (A), as modified by any density bonus, incentive, or concession, or waiver or reduction of development standards and parking ratios, pursuant to Section 65915, from being constructed as proposed by the applicant.
(ii)The local agency shall bear the burden of proof of complying with clause (i).
(C)(i)A project applicant that qualifies for a density bonus pursuant to Section 65915 shall receive two incentives or concessions in addition to those granted pursuant to paragraph (2) of subdivision (d) of Section 65915.
(ii)For a project seeking density bonuses, incentives, concessions, or any other benefits pursuant to Section 65915, and notwithstanding paragraph (6) of subdivision (o) of Section 65915, for purposes of this paragraph, maximum allowable residential density or base density means the density permitted for a builders remedy project pursuant to subparagraph (C) of paragraph (11) of subdivision (h).
(iii)A local agency shall grant any density bonus pursuant to Section 65915 based on the number of units proposed and allowable pursuant to subparagraph (C) of paragraph (11) of subdivision (h).
(iv)A project that dedicates units to extremely low-income households pursuant to subclause (I) of clause (i) of subparagraph (C) of paragraph (3) of subdivision (h) shall be eligible for the same density bonus, incentives or concessions, and waivers or reductions of development standards as provided to a housing development project that dedicates three percentage points more units to very low income households pursuant to paragraph (2) of subdivision (f) of Section 65915.
(v)All units dedicated to extremely low-income, very low income, low-income, and moderate-income households pursuant to paragraph (11) of subdivision (h) shall be counted as affordable units in determining whether the applicant qualifies for a density bonus pursuant to Section 65915.
(D)(i)The project shall not be required to apply for, or receive approval of, a general plan amendment, specific plan amendment, rezoning, or other legislative approval.
(ii)The project shall not be required to apply for, or receive, any approval or permit not generally required of a project of the same type and density proposed by the applicant.
(iii)Any project that complies with this paragraph shall be deemed consistent, compliant, and in conformity with an applicable plan, program, policy, ordinance, standard, requirement, redevelopment plan and implementing instruments, or other similar provision for all purposes, and shall not be considered or treated as a nonconforming lot, use, or structure for any purpose.
(E)A local agency shall not adopt or impose any requirement, process, practice, or procedure or undertake any course of conduct, including, but not limited to, increased fees or inclusionary housing requirements, that applies to a project solely or partially on the basis that the project is a builders remedy project.
(F)(i)A builders remedy project shall be deemed to be in compliance with the residential density standards for the purposes of complying with subdivision (b) of Section 65912.123.
(ii)A builders remedy project shall be deemed to be in compliance with the objective zoning standards, objective subdivision standards, and objective design review standards for the purposes of complying with paragraph (5) of subdivision (a) of Section 65913.4.
(G)(i)(I)If the local agency had a local affordable housing requirement, as defined in Section 65912.101, that on January 1, 2024, required a greater percentage of affordable units than required under subparagraph (A) of paragraph (11) of subdivision (h), or required an affordability level deeper than what is required under subparagraph (A) of paragraph (11) of subdivision (h), then, except as provided in subclauses (II) and (III), the local agency may require a housing development for mixed-income households to comply with an otherwise lawfully applicable local affordability percentage or affordability level. The local agency shall not require housing for mixed-income households to comply with any other aspect of the local affordable housing requirement.
(II)Notwithstanding subclause (I), the local affordable housing requirements shall not be applied to require housing for mixed-income households to dedicate more than 20 percent of the units to affordable units of any kind.
(III)Housing for mixed-income households that is required to dedicate 20 percent of the units to affordable units shall not be required to dedicate any of the affordable units at an income level deeper than lower income households, as defined in Section 50079.5 of the Health and Safety Code.
(IV)A local agency may only require housing for mixed-income households to comply with the local percentage requirement or affordability level described in subclause (I) if it first makes written findings, supported by a preponderance of evidence, that compliance with the local percentage requirement or the affordability level, or both, would not render the housing development project infeasible. If a reasonable person could find compliance with either requirement, either alone or in combination, would render the project infeasible, the project shall not be required to comply with that requirement.
(ii)Affordable units in the development project shall have a comparable bedroom and bathroom count as the market rate units.
(iii)Each affordable unit dedicated pursuant to this subparagraph shall count toward satisfying a local affordable housing requirement. Each affordable unit dedicated pursuant to a local affordable housing requirement that meets the criteria established in this subparagraph shall count towards satisfying the requirements of this subparagraph. This is declaratory of existing law.
(7)(A)For a housing development project application that is deemed complete before January 1, 2025, the development proponent for the project may choose to be subject to the provisions of this section that were in place on the date the preliminary application was submitted, or, if the project meets the definition of a builders remedy project, it may choose to be subject to any or all of the provisions of this section applicable as of January 1, 2025.
(B)Notwithstanding subdivision (c) of Section 65941.1, for a housing development project deemed complete before January 1, 2025, the development proponent may choose to revise their application so that the project is a builders remedy project, without being required to resubmit a preliminary application, even if the revision results in the number of residential units or square footage of construction changing by 20 percent or more.
(8)A housing development project proposed on a site that is identified as suitable or available for very low, low-, or moderate-income households in the jurisdictions housing element, that is consistent with the density specified in the most recently updated and adopted housing element, and that is inconsistent with both the jurisdictions zoning ordinance and general plan land use designation on the date the application was deemed complete, shall be subject to the provisions of subparagraphs (A), (B), and (D) of paragraph (6) and paragraph (9).
(9)For purposes of this subdivision, objective, quantifiable, written development standards, conditions, and policies means criteria that involve no personal or subjective judgment by a public official and are uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official before submittal, including, but not limited to, any standard, ordinance, or policy described in paragraph (4) of subdivision (o). Nothing herein shall affect the obligation of the housing development project to comply with the minimum building standards approved by the California Building Standards Commission as provided in Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code. In the event that applicable objective, quantifiable, written development standards, conditions, and policies are mutually inconsistent, a development shall be deemed consistent with the criteria that permits the density and unit type closest to that of the proposed project.
(g)This section shall be applicable to charter cities because the Legislature finds that the lack of housing, including emergency shelter, is a critical statewide problem.
(h)The following definitions apply for the purposes of this section:
(1)Feasible means capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social, and technological factors.
(2)Housing development project means a use consisting of any of the following:
(A)Residential units only.
(B)Mixed-use developments consisting of residential and nonresidential uses that meet any of the following conditions:
(i)At least two-thirds of the new or converted square footage is designated for residential use.
(ii)At least 50 percent of the new or converted square footage is designated for residential use and the project meets both of the following:
(I)The project includes at least 500 net new residential units.
(II)No portion of the project is designated for use as a hotel, motel, bed and breakfast inn, or other transient lodging, except a portion of the project may be designated for use as a residential hotel, as defined in Section 50519 of the Health and Safety Code.
(iii)At least 50 percent of the net new or converted square footage is designated for residential use and the project meets all of the following:
(I)The project includes at least 500 net new residential units.
(II)The project involves the demolition or conversion of at least 100,000 square feet of nonresidential use.
(III)The project demolishes at least 50 percent of the existing nonresidential uses on the site.
(IV)No portion of the project is designated for use as a hotel, motel, bed and breakfast inn, or other transient lodging, except a portion of the project may be designated for use as a residential hotel, as defined in Section 50519 of the Health and Safety Code.
(C)Transitional housing or supportive housing.
(D)Farmworker housing, as defined in subdivision (h) of Section 50199.7 of the Health and Safety Code.
(3)(A)Housing for very low, low-, or moderate-income households means housing for lower income households, mixed-income households, or moderate-income households.
(B)Housing for lower income households means a housing development project in which 100 percent of the units, excluding managers units, are dedicated to lower income households, as defined in Section 50079.5 of the Health and Safety Code, at an affordable cost, as defined by Section 50052.5 of the Health and Safety Code, or an affordable rent set in an amount consistent with the rent limits established by the California Tax Credit Allocation Committee. The units shall be subject to a recorded deed restriction for a period of 55 years for rental units and 45 years for owner-occupied units.
(C)(i)Housing for mixed-income households means any of the following:
(I)A housing development project in which at least 7 percent of the total units, as defined in subparagraph (A) of paragraph (8) (9) of subdivision (o) of Section 65915, are dedicated to extremely low income households, as defined in Section 50106 of the Health and Safety Code.
(II)A housing development project in which at least 10 percent of the total units, as defined in subparagraph (A) of paragraph (8) (9) of subdivision (o) of Section 65915, are dedicated to very low income households, as defined in Section 50105 of the Health and Safety Code.
(III)A housing development project in which at least 13 percent of the total units, as defined in subparagraph (A) of paragraph (8) (9) of subdivision (o) of Section 65915, are dedicated to lower income households, as defined in Section 50079.5 of the Health and Safety Code.
(IV)A housing development project in which there are 10 or fewer total units, as defined in subparagraph (A) of paragraph (8) (9) of subdivision (o) of Section 65915, that is on a site that is smaller than one acre, and that is proposed for development at a minimum density of 10 units per acre.
(ii)All units dedicated to extremely low income, very low income, and low-income households pursuant to clause (i) shall meet both of the following:
(I)The units shall have an affordable housing cost, as defined in Section 50052.5 of the Health and Safety Code, or an affordable rent, as defined in Section 50053 of the Health and Safety Code.
(II)The development proponent shall agree to, and the local agency shall ensure, the continued affordability of all affordable rental units included pursuant to this section for 55 years and all affordable ownership units included pursuant to this section for a period of 45 years.
(D)Housing for moderate-income households means a housing development project in which 100 percent of the units are sold or rented to moderate-income households, as defined in Section 50093 of the Health and Safety Code, at an affordable housing cost, as defined in Section 50052.5 of the Health and Safety Code, or an affordable rent, as defined in Section 50053 of the Health and Safety Code. The units shall be subject to a recorded deed restriction for a period of 55 years for rental units and 45 years for owner-occupied units.
(4)Area median income means area median income as periodically established by the Department of Housing and Community Development pursuant to Section 50093 of the Health and Safety Code.
(5)Notwithstanding any other law, deemed complete means that the applicant has submitted a preliminary application pursuant to Section 65941.1 or, if the applicant has not submitted a preliminary application, has submitted a complete application pursuant to Section 65943. The local agency shall bear the burden of proof in establishing that the application is not complete.
(6)Disapprove the housing development project includes any instance in which a local agency does any of the following:
(A)Votes or takes final administrative action on a proposed housing development project application and the application is disapproved, including any required land use approvals or entitlements necessary for the issuance of a building permit.
(B)Fails to comply with the time periods specified in subdivision (a) of Section 65950. An extension of time pursuant to Article 5 (commencing with Section 65950) shall be deemed to be an extension of time pursuant to this paragraph.
(C)Fails to meet the time limits specified in comply with subdivisions (b) to (e), inclusive, of Section 65913.3.
(D)Fails to cease a course of conduct undertaken for an improper purpose, such as to harass or to cause unnecessary delay or needless increases in the cost of the proposed housing development project, that effectively disapproves the proposed housing development without taking final administrative action if all of the following conditions are met:
(i)The project applicant provides written notice detailing the challenged conduct and why it constitutes disapproval to the local agency established under Section 65100.
(ii)Within five working days of receiving the applicants written notice described in clause (i), the local agency shall post the notice on the local agencys internet website, provide a copy of the notice to any person who has made a written request for notices pursuant to subdivision (f) of Section 21167 of the Public Resources Code, and file the notice with the county clerk of each county in which the project will be located. The county clerk shall post the notice and make it available for public inspection in the manner set forth in subdivision (c) of Section 21152 of the Public Resources Code.
(iii)The local agency shall consider all objections, comments, evidence, and concerns about the project or the applicants written notice and shall not make a determination until at least 60 days after the applicant has given written notice to the local agency pursuant to clause (i).
(iv)Within 90 days of receipt of the applicants written notice described in clause (i), the local agency shall issue a written statement that it will immediately cease the challenged conduct or issue written findings that comply with both of the following requirements:
(I)The findings articulate an objective basis for why the challenged course of conduct is necessary.
(II)The findings provide clear instructions on what the applicant must submit or supplement so that the local agency can make a final determination regarding the next necessary approval or set the date and time of the next hearing.
(v)(I)If a local agency continues the challenged course of conduct described in the applicants written notice and fails to issue the written findings described in clause (iv), the local agency shall bear the burden of establishing that its course of conduct does not constitute a disapproval of the housing development project under this subparagraph in an action taken by the applicant.
(II)If an applicant challenges a local agencys course of conduct as a disapproval under this subparagraph, the local agencys written findings described in clause (iv) shall be incorporated into the administrative record and be deemed to be the final administrative action for purposes of adjudicating whether the local agencys course of conduct constitutes a disapproval of the housing development project under this subparagraph.
(vi)A local agencys action in furtherance of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), including, but not limited to, imposing mitigating measures, shall not constitute project disapproval under this subparagraph.
(E)Fails to comply with Section 65905.5. For purposes of this subparagraph, a builders remedy project shall be deemed to comply with the applicable, objective general plan and zoning standards in effect at the time an application is deemed complete.
(F)(i)Determines that an application for a housing development project is incomplete pursuant to subdivision (a) or (b) of Section 65943 and includes in the determination an item that is not required on the local agencys submittal requirement checklist. The local agency shall bear the burden of proof that the required item is listed on the submittal requirement checklist.
(ii)In a subsequent review of an application pursuant to Section 65943, requests the applicant provide new information that was not identified in the initial determination and upholds this determination in the final written determination on an appeal filed pursuant to subdivision (c) of Section 65943. The local agency shall bear the burden of proof that the required item was identified in the initial determination.
(iii)Determines that an application for a housing development project is incomplete pursuant to subdivision (a) or (b) of Section 65943, a reasonable person would conclude that the applicant has submitted all of the items required on the local agencys submittal requirement checklist, and the local agency upholds this determination in the final written determination on an appeal filed pursuant to subdivision (c) of Section 65943.
(iv)If a local agency determines that an application is incomplete under Section 65943 after two resubmittals of the application by the applicant, the local agency shall bear the burden of establishing that the determination is not an effective disapproval of a housing development project under this section.
(G)Violates subparagraph (D) or (E) of paragraph (6) of subdivision (f).
(H)Makes a written determination that a preliminary application described in subdivision (a) of Section 65941.1 has expired or that the applicant has otherwise lost its vested rights under the preliminary application for any reason other than those described in subdivisions (c) and (d) of Section 65941.1.
(I)(i)Fails to make a determination of whether the project is exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), or commits an abuse of discretion, as defined in subdivision (b) of Section 65589.5.1 if all of the conditions in Section 65589.5.1 are satisfied.
(ii)This subparagraph shall become inoperative on January 1, 2031.
(J)(i)Fails to adopt a negative declaration or addendum for the project, to certify an environmental impact report for the project, or to approve another comparable environmental document, such as a sustainable communities environmental assessment pursuant to Section 21155.2 of the Public Resources Code, as required pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), if all of the conditions in Section 65589.5.2 are satisfied.
(ii)This subparagraph shall become inoperative on January 1, 2031.
(7)(A)For purposes of this section and Sections 65589.5.1 and 65589.5.2, lawful determination means any final decision about whether to approve or disapprove a statutory or categorical exemption or a negative declaration, addendum, environmental impact report, or comparable environmental review document under the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) that is not an abuse of discretion, as defined in subdivision (b) of Section 65589.5.1 or subdivision (b) of Section 65589.5.2.
(B)This paragraph shall become inoperative on January 1, 2031.
(8)Lower density includes any conditions that have the same effect or impact on the ability of the project to provide housing.
(9)Objective means involving no personal or subjective judgment by a public official and being uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official.
(10)Notwithstanding any other law, determined to be complete means that the applicant has submitted a complete application pursuant to Section 65943.
(11)Builders remedy project means a project that meets all of the following criteria:
(A)The project is a housing development project that provides housing for very low, low-, or moderate-income households.
(B)On or after the date an application for the housing development project or emergency shelter was deemed complete, the jurisdiction did not have a housing element that was in substantial compliance with this article.
(C)The project has a density such that the number of units, as calculated before the application of a density bonus pursuant to Section 65915, complies with all of the following conditions:
(i)The density does not exceed the greatest of the following densities:
(I)Fifty percent greater than the minimum density deemed appropriate to accommodate housing for that jurisdiction as specified in subparagraph (B) of paragraph (3) of subdivision (c) of Section 65583.2.
(II)Three times the density allowed by the general plan, zoning ordinance, or state law, whichever is greater.
(III)The density that is consistent with the density specified in the housing element.
(ii)Notwithstanding clause (i), the greatest allowable density shall be 35 units per acre more than the amount allowable pursuant to clause (i), if any portion of the site is located within any of the following:
(I)One-half mile of a major transit stop, as defined in Section 21064.3 of the Public Resources Code.
(II)A very low vehicle travel area, as defined in subdivision (h).
(III)A high or highest resource census tract, as identified by the latest edition of the CTCAC/HCD Opportunity Map published by the California Tax Credit Allocation Committee and the Department of Housing and Community Development.
(D)(i)On sites that have a minimum density requirement and are located within one-half mile of a commuter rail station or a heavy rail station, the density of the project shall not be less than the minimum density required on the site.
(I)For purposes of this subparagraph, commuter rail means a railway that is not a light rail, streetcar, trolley, or tramway and that is for urban passenger train service consisting of local short distance travel operating between a central city and adjacent suburb with service operated on a regular basis by or under contract with a transit operator for the purpose of transporting passengers within urbanized areas, or between urbanized areas and outlying areas, using either locomotive-hauled or self-propelled railroad passenger cars, with multitrip tickets and specific station-to-station fares.
(II)For purposes of this subparagraph, heavy rail means an electric railway with the capacity for a heavy volume of traffic using high speed and rapid acceleration passenger rail cars operating singly or in multicar trains on fixed rails, separate rights-of-way from which all other vehicular and foot traffic are excluded, and high platform loading.
(ii)On all other sites with a minimum density requirement, the density of the project shall not be less than the local agencys minimum density or one-half of the minimum density deemed appropriate to accommodate housing for that jurisdiction as specified in subparagraph (B) of paragraph (3) of subdivision (c) of Section 65583.2, whichever is lower.
(E)The project site does not abut a site where more than one-third of the square footage on the site has been used, within the past three years, by a heavy industrial use, or a Title V industrial use, as those terms are defined in Section 65913.16.
(12)Condition approval includes imposing on the housing development project, or attempting to subject it to, development standards, conditions, or policies.
(13)Unit type means the form of ownership and the kind of residential unit, including, but not limited to, single-family detached, single-family attached, for-sale, rental, multifamily, townhouse, condominium, apartment, manufactured homes and mobilehomes, factory-built housing, and residential hotel.
(14)Proposed by the applicant means the plans and designs as submitted by the applicant, including, but not limited to, density, unit size, unit type, site plan, building massing, floor area ratio, amenity areas, open space, parking, and ancillary commercial uses.
(i)If any city, county, or city and county denies approval or imposes conditions, including design changes, lower density, or a reduction of the percentage of a lot that may be occupied by a building or structure under the applicable planning and zoning in force at the time the housing development projects application is complete, that have a substantial adverse effect on the viability or affordability of a housing development for very low, low-, or moderate-income households, and the denial of the development or the imposition of conditions on the development is the subject of a court action which challenges the denial or the imposition of conditions, then the burden of proof shall be on the local legislative body to show that its decision is consistent with the findings as described in subdivision (d), and that the findings are supported by a preponderance of the evidence in the record, and with the requirements of subdivision (o).
(j)(1)When a proposed housing development project complies with applicable, objective general plan, zoning, and subdivision standards and criteria, including design review standards, in effect at the time that the application was deemed complete, but the local agency proposes to disapprove the project or to impose a condition that the project be developed at a lower density, the local agency shall base its decision regarding the proposed housing development project upon written findings supported by a preponderance of the evidence on the record that both of the following conditions exist:
(A)The housing development project would have a specific, adverse impact upon the public health or safety unless the project is disapproved or approved upon the condition that the project be developed at a lower density. As used in this paragraph, a specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(B)There is no feasible method to satisfactorily mitigate or avoid the adverse impact identified pursuant to paragraph (1), other than the disapproval of the housing development project or the approval of the project upon the condition that it be developed at a lower density.
(2)(A)If the local agency considers a proposed housing development project to be inconsistent, not in compliance, or not in conformity with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision as specified in this subdivision, it shall provide the applicant with written documentation identifying the provision or provisions, and an explanation of the reason or reasons it considers the housing development to be inconsistent, not in compliance, or not in conformity as follows:
(i)Within 30 days of the date that the application for the housing development project is determined to be complete, if the housing development project contains 150 or fewer housing units.
(ii)Within 60 days of the date that the application for the housing development project is determined to be complete, if the housing development project contains more than 150 units.
(B)If the local agency fails to provide the required documentation pursuant to subparagraph (A), the housing development project shall be deemed consistent, compliant, and in conformity with the applicable plan, program, policy, ordinance, standard, requirement, or other similar provision.
(3)For purposes of this section, the receipt of a density bonus, incentive, concession, waiver, or reduction of development standards pursuant to Section 65915 shall not constitute a valid basis on which to find a proposed housing development project is inconsistent, not in compliance, or not in conformity, with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision specified in this subdivision.
(4)For purposes of this section, a proposed housing development project is not inconsistent with the applicable zoning standards and criteria, and shall not require a rezoning, if the housing development project is consistent with the objective general plan standards and criteria but the zoning for the project site is inconsistent with the general plan. If the local agency has complied with paragraph (2), the local agency may require the proposed housing development project to comply with the objective standards and criteria of the zoning which is consistent with the general plan, however, the standards and criteria shall be applied to facilitate and accommodate development at the density allowed on the site by the general plan and proposed by the proposed housing development project.
(k)(1)(A)(i)The applicant, a person who would be eligible to apply for residency in the housing development project or emergency shelter, or a housing organization may bring an action to enforce this section. If, in any action brought to enforce this section, a court finds that any of the following are met, the court shall issue an order pursuant to clause (ii):
(I)The local agency, in violation of subdivision (d), disapproved a housing development project or conditioned its approval in a manner rendering it infeasible for the development of an emergency shelter, or housing for very low, low-, or moderate-income households, including farmworker housing, without making the findings required by this section.
(II)The local agency, in violation of subdivision (j), disapproved a housing development project complying with applicable, objective general plan and zoning standards and criteria, or imposed a condition that the project be developed at a lower density, without making the findings required by this section.
(III)The local agency, in violation of subdivision (o), required or attempted to require a housing development project to comply with an ordinance, policy, or standard not adopted and in effect when a preliminary application was submitted.
(IV)The local agency violated a provision of this section applicable to a builders remedy project.
(ii)If the court finds that one of the conditions in clause (i) is met, the court shall issue an order or judgment compelling compliance with this section within a time period not to exceed 60 days, including, but not limited to, an order that the local agency take action on the housing development project or emergency shelter. The court may issue an order or judgment directing the local agency to approve the housing development project or emergency shelter if the court finds that the local agency acted in bad faith when it disapproved or conditionally approved the housing development or emergency shelter in violation of this section. The court shall retain jurisdiction to ensure that its order or judgment is carried out and shall award reasonable attorneys fees and costs of suit to the plaintiff or petitioner, provided, however, that the court shall not award attorneys fees in either of the following instances:
(I)The court finds, under extraordinary circumstances, that awarding fees would not further the purposes of this section.
(II)(ia)In a case concerning a disapproval within the meaning of subparagraph (I) or (J) of paragraph (6) of subdivision (h), the court finds that the local agency acted in good faith and had reasonable cause to disapprove the housing development project due to the existence of a controlling question of law about the application of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) or implementing guidelines as to which there was a substantial ground for difference of opinion at the time of the disapproval.
(ib)This subclause shall become inoperative on January 1, 2031.
(B)Upon a determination that the local agency has failed to comply with the order or judgment compelling compliance with this section within the time period prescribed by the court, the court shall impose fines on a local agency that has violated this section and require the local agency to deposit any fine levied pursuant to this subdivision into a local housing trust fund. The local agency may elect to instead deposit the fine into the Building Homes and Jobs Trust Fund. The fine shall be in a minimum amount of ten thousand dollars ($10,000) per housing unit in the housing development project on the date the application was deemed complete pursuant to Section 65943. In determining the amount of the fine to impose, the court shall consider the local agencys progress in attaining its target allocation of the regional housing need pursuant to Section 65584 and any prior violations of this section. Fines shall not be paid out of funds already dedicated to affordable housing, including, but not limited to, Low and Moderate Income Housing Asset Funds, funds dedicated to housing for very low, low-, and moderate-income households, and federal HOME Investment Partnerships Program and Community Development Block Grant Program funds. The local agency shall commit and expend the money in the local housing trust fund within five years for the sole purpose of financing newly constructed housing units affordable to extremely low, very low, or low-income households. After five years, if the funds have not been expended, the money shall revert to the state and be deposited in the Building Homes and Jobs Trust Fund for the sole purpose of financing newly constructed housing units affordable to extremely low, very low, or low-income households.
(C)If the court determines that its order or judgment has not been carried out within 60 days, the court may issue further orders as provided by law to ensure that the purposes and policies of this section are fulfilled, including, but not limited to, an order to vacate the decision of the local agency and to approve the housing development project, in which case the application for the housing development project, as proposed by the applicant at the time the local agency took the initial action determined to be in violation of this section, along with any standard conditions determined by the court to be generally imposed by the local agency on similar projects, shall be deemed to be approved unless the applicant consents to a different decision or action by the local agency.
(D)Nothing in this section shall limit the courts inherent authority to make any other orders to compel the immediate enforcement of any writ brought under this section, including the imposition of fees and other sanctions set forth under Section 1097 of the Code of Civil Procedure.
(2)For purposes of this subdivision, housing organization means a trade or industry group whose local members are primarily engaged in the construction or management of housing units or a nonprofit organization whose mission includes providing or advocating for increased access to housing for low-income households and have filed written or oral comments with the local agency prior to action on the housing development project. A housing organization may only file an action pursuant to this section to challenge the disapproval of a housing development by a local agency. A housing organization shall be entitled to reasonable attorneys fees and costs if it is the prevailing party in an action to enforce this section.
(l)If the court finds that the local agency (1) acted in bad faith when it violated this section and (2) failed to carry out the courts order or judgment within the time period prescribed by the court, the court, in addition to any other remedies provided by this section, shall multiply the fine determined pursuant to subparagraph (B) of paragraph (1) of subdivision (k) by a factor of five. If a court has previously found that the local agency violated this section within the same planning period, the court shall multiply the fines by an additional factor for each previous violation. For purposes of this section, bad faith includes, but is not limited to, an action or inaction that is frivolous, pretextual, intended to cause unnecessary delay, or entirely without merit.
(m)(1)Any action brought to enforce the provisions of this section shall be brought pursuant to Section 1094.5 of the Code of Civil Procedure, and the local agency shall prepare and certify the record of proceedings in accordance with subdivision (c) of Section 1094.6 of the Code of Civil Procedure no later than 30 days after the petition is served, provided that the cost of preparation of the record shall be borne by the local agency, unless the petitioner elects to prepare the record as provided in subdivision (n) of this section. A petition to enforce the provisions of this section shall be filed and served no later than 90 days from the later of (1) the effective date of a decision of the local agency imposing conditions on, disapproving, or any other final action on a housing development project or (2) the expiration of the time periods specified in subparagraph (B) of paragraph (5) of subdivision (h). Upon entry of the trial courts order, a party may, in order to obtain appellate review of the order, file a petition within 20 days after service upon it of a written notice of the entry of the order, or within such further time not exceeding an additional 20 days as the trial court may for good cause allow, or may appeal the judgment or order of the trial court under Section 904.1 of the Code of Civil Procedure. If the local agency appeals the judgment of the trial court, the local agency shall post a bond, in an amount to be determined by the court, to the benefit of the plaintiff if the plaintiff is the project applicant.
(2)(A)A disapproval within the meaning of subparagraph (I) of paragraph (6) of subdivision (h) shall be final for purposes of this subdivision, if the local agency did not make a lawful determination within the time period set forth in paragraph (5) of subdivision (a) of Section 65589.5.1 after the applicants timely written notice.
(B)This paragraph shall become inoperative on January 1, 2031.
(3)(A)A disapproval within the meaning of subparagraph (J) of paragraph (6) of subdivision (h) shall be final for purposes of this subdivision, if the local agency did not make a lawful determination within 90 days of the applicants timely written notice.
(B)This paragraph shall become inoperative on January 1, 2031.
(n)In any action, the record of the proceedings before the local agency shall be filed as expeditiously as possible and, notwithstanding Section 1094.6 of the Code of Civil Procedure or subdivision (m) of this section, all or part of the record may be prepared (1) by the petitioner with the petition or petitioners points and authorities, (2) by the respondent with respondents points and authorities, (3) after payment of costs by the petitioner, or (4) as otherwise directed by the court. If the expense of preparing the record has been borne by the petitioner and the petitioner is the prevailing party, the expense shall be taxable as costs.
(o)(1)Subject to paragraphs (2), (6), and (7), and subdivision (d) of Section 65941.1, a housing development project shall be subject only to the ordinances, policies, and standards adopted and in effect when a preliminary application including all of the information required by subdivision (a) of Section 65941.1 was submitted.
(2)Paragraph (1) shall not prohibit a housing development project from being subject to ordinances, policies, and standards adopted after the preliminary application was submitted pursuant to Section 65941.1 in the following circumstances:
(A)In the case of a fee, charge, or other monetary exaction, to an increase resulting from an automatic annual adjustment based on an independently published cost index that is referenced in the ordinance or resolution establishing the fee or other monetary exaction.
(B)A preponderance of the evidence in the record establishes that subjecting the housing development project to an ordinance, policy, or standard beyond those in effect when a preliminary application was submitted is necessary to mitigate or avoid a specific, adverse impact upon the public health or safety, as defined in subparagraph (A) of paragraph (1) of subdivision (j), and there is no feasible alternative method to satisfactorily mitigate or avoid the adverse impact.
(C)Subjecting the housing development project to an ordinance, policy, standard, or any other measure, beyond those in effect when a preliminary application was submitted is necessary to avoid or substantially lessen an impact of the project under the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(D)The housing development project has not commenced construction within two and one-half years, or three and one-half years for an affordable housing project, following the date that the project received final approval. For purposes of this subparagraph:
(i)Affordable housing project means a housing development that satisfies both of the following requirements:
(I)Units within the development are subject to a recorded affordability restriction for at least 55 years for rental housing and 45 years for owner-occupied housing, or the first purchaser of each unit participates in an equity sharing agreement as described in subparagraph (C) of paragraph (2) of subdivision (c) of Section 65915.
(II)All of the units within the development, excluding managers units, are dedicated to lower income households, as defined by Section 50079.5 of the Health and Safety Code.
(ii)Final approval means that the housing development project has received all necessary approvals to be eligible to apply for, and obtain, a building permit or permits and either of the following is met:
(I)The expiration of all applicable appeal periods, petition periods, reconsideration periods, or statute of limitations for challenging that final approval without an appeal, petition, request for reconsideration, or legal challenge having been filed.
(II)If a challenge is filed, that challenge is fully resolved or settled in favor of the housing development project.
(E)The housing development project is revised following submittal of a preliminary application pursuant to Section 65941.1 such that the number of residential units or square footage of construction changes by 20 percent or more, exclusive of any increase resulting from the receipt of a density bonus, incentive, concession, waiver, or similar provision, including any other locally authorized program that offers additional density or other development bonuses when affordable housing is provided. For purposes of this subdivision, square footage of construction means the building area, as defined by the California Building Standards Code (Title 24 of the California Code of Regulations).
(3)This subdivision does not prevent a local agency from subjecting the additional units or square footage of construction that result from project revisions occurring after a preliminary application is submitted pursuant to Section 65941.1 to the ordinances, policies, and standards adopted and in effect when the preliminary application was submitted.
(4)For purposes of this subdivision, ordinances, policies, and standards includes general plan, community plan, specific plan, zoning, design review standards and criteria, subdivision standards and criteria, and any other rules, regulations, requirements, and policies of a local agency, as defined in Section 66000, including those relating to development impact fees, capacity or connection fees or charges, permit or processing fees, and other exactions.
(5)This subdivision shall not be construed in a manner that would lessen the restrictions imposed on a local agency, or lessen the protections afforded to a housing development project, that are established by any other law, including any other part of this section.
(6)This subdivision shall not restrict the authority of a public agency or local agency to require mitigation measures to lessen the impacts of a housing development project under the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(7)With respect to completed residential units for which the project approval process is complete and a certificate of occupancy has been issued, nothing in this subdivision shall limit the application of later enacted ordinances, policies, and standards that regulate the use and occupancy of those residential units, such as ordinances relating to rental housing inspection, rent stabilization, restrictions on short-term renting, and business licensing requirements for owners of rental housing.
(p)(1)Upon any motion for an award of attorneys fees pursuant to Section 1021.5 of the Code of Civil Procedure, in a case challenging a local agencys approval of a housing development project, a court, in weighing whether a significant benefit has been conferred on the general public or a large class of persons and whether the necessity of private enforcement makes the award appropriate, shall give due weight to the degree to which the local agencys approval furthers policies of this section, including, but not limited to, subdivisions (a), (b), and (c), the suitability of the site for a housing development, and the reasonableness of the decision of the local agency. It is the intent of the Legislature that attorneys fees and costs shall rarely, if ever, be awarded if a local agency, acting in good faith, approved a housing development project that satisfies conditions established in paragraph (1), (2), or (3) of subdivision (a) of Section 65589.5.1 or paragraph (1), (2), or (3) of subdivision (a) of Section 65589.5.2.
(2)This subdivision shall become inoperative on January 1, 2031.
(q)This section shall be known, and may be cited, as the Housing Accountability Act.
(r)The provisions of this section are severable. If any provision of this section or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
SEC. 2.Section 65913.3 of the Government Code is amended to read:65913.3.(a)(1)A local agency shall compile one or more lists that shall specify in detail the information that will be required from any applicant for a postentitlement phase permit. The local agency may revise the lists of information required from an applicant. Any revised list shall not apply to any permit pending review.
(2)A local agency shall post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least five types of housing development projects in the jurisdiction, including, but not limited to, accessory dwelling unit, duplex, multifamily, mixed use, and townhome.
(3)A local agency shall make the items required by paragraphs (1) and (2) available on the agencys internet website no later than January 1, 2024.
(b)(1)(A)A local agency shall determine whether an application for a postentitlement phase permit is complete and provide written notice of this determination to the applicant not later than 15 business days after the local agency received the application.
(B)If the local agency determines an application is incomplete, the local agency shall provide the applicant with a list of incomplete items and a description of how the application can be made complete. The list shall be limited to incomplete items that are included on the lists required by paragraph (1) of subdivision (a). The list and description shall be provided with the written notice required by subparagraph (A).
(2)(A)After receiving a notice that the application was incomplete, an applicant may cure and address the items that are deemed to be incomplete by the local agency.
(B)In the review of an application submitted pursuant to subparagraph (A), the local agency shall not require the application to include an item that was not included in the list required by subparagraph (B) of paragraph (1).
(C)If an applicant submits an application pursuant to subparagraph (A), the local agency shall determine whether the additional application has remedied all incomplete items listed in the determination issued pursuant to subparagraph (B) of paragraph (1). This additional application is subject to the timelines and requirements specified in subparagraph (A) of paragraph (1).
(3)If a local agency does not make a timely determination as required by paragraph (1) or (2) and the application or resubmitted application states that it is for a postentitlement phase permit, the application or resubmitted application shall be deemed to be complete for the purposes of this chapter.
(c)(1)(A)For housing development projects with 25 units or fewer, a local agency shall complete the review and do either of the following:
(i)If the local agency determines that the complete application is not compliant with the permit standards, return in writing a full set of comments to the applicant with a comprehensive request for revisions.
(ii)If the local agency determines that the complete application is compliant with the permit standards, return the approved permit application on each postentitlement phase permit requested.
(B)The local agency shall immediately transmit that determination to the applicant by electronic mail and, if applicable, by posting the response on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 not later than 30 business days after the local agency determines that an application for a postentitlement phase permit is complete pursuant to subdivision (b).
(C)(i)As part of its review, the local agency shall not require or request more than two plan check and specification reviews in connection with an application for a building permit, unless the local agencys requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety.
(ii)A Notwithstanding clause (i), a local agency may deny an application that is not compliant with the permit standards following two submittals. plan check and specification reviews.
(iii)An applicant may request additional submittals of applications that are not compliant with the permit standards.
(iv)This subparagraph shall not be construed to affect the number of submittals that a local agency may require or request for any postentitlement phase permit other than a building permit.
(2)(A)For housing development projects with 26 units or more, a local agency shall complete the review and do either of the following:
(i)If the local agency determines that the complete application is not compliant with the permit standards, return in writing a full set of comments to the applicant with a comprehensive request for revisions.
(ii)If the local agency determines that the complete application is compliant with the permit standards, return the approved permit application on each postentitlement phase permit requested.
(B)The local agency shall immediately transmit that determination to the applicant by electronic mail and, if applicable, by posting the response on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 not later than 60 business days after the local agency determines that an application for a postentitlement phase permit is complete pursuant to subdivision (b).
(C)(i)As part of its review, the local agency shall not require or request more than two plan check and specification reviews in connection with an application for a building permit, unless the local agencys requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety.
(ii)A Notwithstanding clause (i), a local agency may deny an application that is not compliant with the permit standards following two submittals. plan check and specification reviews.
(iii)An applicant may request additional submittals of applications that are not compliant with the permit standards.
(iv)This subparagraph shall not be construed to affect the number of submittals that a local agency may require or request for any postentitlement phase permit other than a building permit.
(3)Once a local agency determines that a postentitlement permit is compliant with applicable permit standards pursuant to paragraph (1) or (2), the local agency shall not subject the postentitlement phase permit to any appeals or additional hearing requirements.
(4)The time limits in this subdivision shall not apply if the local agency makes written findings within the time limits specified in paragraph (1) or (2) based on substantial evidence in the record that the proposed postentitlement phase permit might have a specific, adverse impact on public health or safety and that additional time is necessary to process the application.
(5)(A)If federal or state law requires review of the application by another public agency that is independent of the local agency before the local agency is authorized to act on the application, the time limits in this subdivision shall be tolled for the application until the public agency completes the review and returns the application to the local agency.
(B)After the public agency returns the application to the local agency, the local agency shall complete the review within the time remaining under the time limit, subject to subparagraph (C).
(C)Within three business days of the start of the tolling and within three business days of the resumption of the time limit, the local agency shall notify the applicant of the tolling and the resumption of the time limit, respectively, by electronic mail and, if applicable, by posting the notification on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5.
(d)(1)If a local agency finds that a complete application is noncompliant, the local agency shall provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within the time limits specified in subdivision (c).
(2)The local agency shall provide the list and description authorized by paragraph (1) when it transmits its determination to the applicant as required by subdivision (c).
(3)If a local agency denies a postentitlement phase permit application based on a determination that the application is noncompliant, the applicant may attempt to remedy the application.
(4)If an applicant submits an application pursuant to paragraph (3), the additional application is subject to the timelines of a new application as specified in subdivision (c).
(5)The local agency shall not request or require any action or inaction as a result of a building inspection undertaken to assess compliance with the applicable building permit standards that would represent a deviation from a previously approved building plan or similar approval for the building permit, unless the local agencys requirement or request is accompanied by written findings based on substantial evidence in the record that both of the following apply:
(A)A reasonable person could not interpret the previously approved building plan or similar approval that was approved by the local agency as being compliant with the applicable standards for the building permit.
(B)The deviation is necessary to address a specific, adverse impact on public health or safety.
(e)(1)If a postentitlement phase permit is determined to be incomplete under subdivision (b) or denied or determined to be noncompliant under subdivision (c) or (d), the local agency shall provide a process for the applicant to appeal that decision in writing to the governing body of the agency.
(2)(A)With respect to a postentitlement phase permit concerning housing development projects with 25 units or fewer, a local agency on the appeal shall provide a final written determination by not later than 30 business days after receipt of the applicants written appeal.
(B)With respect to a postentitlement phase permit concerning housing development projects with 26 units or more, a local agency on the appeal shall provide a final written determination by not later than 45 business days after receipt of the applicants written appeal.
(3)If the applicants appeal pursuant to this subdivision is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required, the applicant may seek a writ of mandate to compel approval of the application.
(f)If a local agency violates this section, subdivisions (b) to (e), inclusive, it shall be in violation of Section 65589.5.
(g)Except as provided in subparagraph (D) (C) of paragraph (1) of, and subparagraph (D) (C) of paragraph (2) of, subdivision (c), this section does not place limitations on the amount of feedback that a local agency may provide or revisions that a local agency may request of an applicant.
(h)For residential or residential mixed-use developments that are subject to the requirements set forth in Section 65913.4, the provisions of paragraph (2) of subdivision (h) of Section 65913.4 shall apply. Permits for these developments that are subject to paragraph (2) of subdivision (h) of Section 65913.4 shall not be in conflict with the requirements of this section. The local agency shall comply with both sets of standards.
(i)This section does not preclude an applicant and a local agency from mutually agreeing to an extension of any time limit provided by this section. However, a local agency shall not require an agreement as a condition of accepting the application for, or processing of, a postentitlement phase permit, unless the agreement is obtained for the purpose of permitting concurrent processing of related approvals or an environmental review on the same housing development project.
(j)For purposes of this section, the following definitions apply:
(1)Housing development project has the same meaning as in paragraph (3) of subdivision (b) of Section 65905.5.
(2)Local agency means any county, city, or city and county.
(3)(A)Postentitlement phase permit includes both of the following:
(i)All nondiscretionary permits and reviews that are required or issued by the local agency after the entitlement process has been completed to begin construction of a development that is intended to be at least two-thirds residential, excluding discretionary and ministerial planning permits, entitlements, and other permits and reviews that are covered under Chapter 4.5 (commencing with Section 65920). A postentitlement phase permit includes, but is not limited to, all of the following:
(I)Building permits, and all interdepartmental review required for the issuance of a building permit, including plan checking and building inspection.
(II)Permits for minor or standard off-site improvements.
(III)Permits for demolition.
(IV)Permits for minor or standard excavation and grading.
(ii)All building permits and other permits issued under the California Building Standards Code (Title 24 of the California Code of Regulations) or any applicable local building code for the construction, demolition, or alteration of buildings, whether discretionary or nondiscretionary.
(B)A local agency may identify by ordinance a threshold for determining whether a permit constitutes a minor or standard permit for the purposes of this paragraph, which shall be supported by written findings adopted by the jurisdiction.
(C)A postentitlement phase permit does not include a permit required and issued by the California Coastal Commission, a special district, a utility that is not owned and operated by a local agency, or any other entity that is not a city, county, or city and county.
(4)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
SEC. 3.The amendments of subclause (I) of clause (i) of subparagraph (A) of paragraph (3) of subdivision (j) of Section 65913.3 of the Government Code made by this act do not constitute a change in, but are declaratory of, existing law.
SEC. 4.The Legislature finds and declares that Section 2 of this act amending Section 65913.3 of the Government Code addresses a matter of statewide concern rather than a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 2 of this act applies to all cities, including charter cities.
SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)(1)The Legislature finds and declares all of the following:
(A)The lack of housing, including emergency shelters, is a critical problem that threatens the economic, environmental, and social quality of life in California.
(B)California housing has become the most expensive in the nation. The excessive cost of the states housing supply is partially caused by activities and policies of many local governments that limit the approval of housing, increase the cost of land for housing, and require that high fees and exactions be paid by producers of housing.
(C)Among the consequences of those actions are discrimination against low-income and minority households, lack of housing to support employment growth, imbalance in jobs and housing, reduced mobility, urban sprawl, excessive commuting, and air quality deterioration.
(D)Many local governments do not give adequate attention to the economic, environmental, and social costs of decisions that result in disapproval of housing development projects, reduction in density of housing projects, and excessive standards for housing development projects.
(2)In enacting the amendments made to this section by the act adding this paragraph, the Legislature further finds and declares the following:
(A)California has a housing supply and affordability crisis of historic proportions. The consequences of failing to effectively and aggressively confront this crisis are hurting millions of Californians, robbing future generations of the chance to call California home, stifling economic opportunities for workers and businesses, worsening poverty and homelessness, and undermining the states environmental and climate objectives.
(B)While the causes of this crisis are multiple and complex, the absence of meaningful and effective policy reforms to significantly enhance the approval and supply of housing affordable to Californians of all income levels is a key factor.
(C)The crisis has grown so acute in California that supply, demand, and affordability fundamentals are characterized in the negative: underserved demands, constrained supply, and protracted unaffordability.
(D)According to reports and data, California has accumulated an unmet housing backlog of nearly 2,000,000 units and must provide for at least 180,000 new units annually to keep pace with growth through 2025.
(E)Californias overall home ownership rate is at its lowest level since the 1940s. The state ranks 49th out of the 50 states in home ownership rates as well as in the supply of housing per capita. Only one-half of Californias households are able to afford the cost of housing in their local regions.
(F)Lack of supply and rising costs are compounding inequality and limiting advancement opportunities for many Californians.
(G)The majority of California renters, more than 3,000,000 households, pay more than 30 percent of their income toward rent and nearly one-third, more than 1,500,000 households, pay more than 50 percent of their income toward rent.
(H)When Californians have access to safe and affordable housing, they have more money for food and health care; they are less likely to become homeless and in need of government-subsidized services; their children do better in school; and businesses have an easier time recruiting and retaining employees.
(I)An additional consequence of the states cumulative housing shortage is a significant increase in greenhouse gas emissions caused by the displacement and redirection of populations to states with greater housing opportunities, particularly working- and middle-class households. Californias cumulative housing shortfall therefore has not only national but international environmental consequences.
(J)Californias housing picture has reached a crisis of historic proportions despite the fact that, for decades, the Legislature has enacted numerous statutes intended to significantly increase the approval, development, and affordability of housing for all income levels, including this section.
(K)The Legislatures intent in enacting this section in 1982 and in expanding its provisions since then was to significantly increase the approval and construction of new housing for all economic segments of Californias communities by meaningfully and effectively curbing the capability of local governments to deny, reduce the density for, or render infeasible housing development projects and emergency shelters. That intent has not been fulfilled.
(L)It is the policy of the state that this section be interpreted and implemented in a manner to afford the fullest possible weight to the interest of, and the approval and provision of, housing.
(3)It is the intent of the Legislature that the conditions that would have a specific, adverse impact upon the public health and safety, as described in paragraph (2) of subdivision (d) and paragraph (1) of subdivision (j), arise infrequently.
(4)It is the intent of the Legislature that the amendments removing provisions from subparagraphs (D) and (E) of paragraph (6) of subdivision (h) and adding those provisions to Sections 65589.5.1 and 65589.5.2 by Assembly Bill 1413 (2023), insofar as they are substantially the same as existing law, shall be considered restatements and continuations of existing law, and not new enactments.
(b)It is the policy of the state that a local government not reject or make infeasible housing development projects, including emergency shelters, that contribute to meeting the need determined pursuant to this article without a thorough analysis of the economic, social, and environmental effects of the action and without complying with subdivision (d).
(c)The Legislature also recognizes that premature and unnecessary development of agricultural lands for urban uses continues to have adverse effects on the availability of those lands for food and fiber production and on the economy of the state. Furthermore, it is the policy of the state that development should be guided away from prime agricultural lands; therefore, in implementing this section, local jurisdictions should encourage, to the maximum extent practicable, in filling existing urban areas.
(d)For a housing development project for very low, low-, or moderate-income households, or an emergency shelter, a local agency shall not disapprove the housing development project or emergency shelter, or condition approval in a manner that renders the housing development project or emergency shelter infeasible, including through the use of design review standards, unless it makes written findings, based upon a preponderance of the evidence in the record, as to one of the following:
(1)The jurisdiction has adopted a housing element pursuant to this article that has been revised in accordance with Section 65588, is in substantial compliance with this article, and the jurisdiction has met or exceeded its share of the regional housing need allocation pursuant to Section 65584 for the planning period for the income category proposed for the housing development project, provided that any disapproval or conditional approval shall not be based on any of the reasons prohibited by Section 65008. If the housing development project includes a mix of income categories, and the jurisdiction has not met or exceeded its share of the regional housing need for one or more of those categories, then this paragraph shall not be used to disapprove or conditionally approve the housing development project. The share of the regional housing need met by the jurisdiction shall be calculated consistently with the forms and definitions that may be adopted by the Department of Housing and Community Development pursuant to Section 65400. In the case of an emergency shelter, the jurisdiction shall have met or exceeded the need for emergency shelter, as identified pursuant to paragraph (7) of subdivision (a) of Section 65583. Any disapproval or conditional approval pursuant to this paragraph shall be in accordance with applicable law, rule, or standards.
(2)The housing development project or emergency shelter as proposed would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact without rendering the development unaffordable to low- and moderate-income households or rendering the development of the emergency shelter financially infeasible. As used in this paragraph, a specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete. The following shall not constitute a specific, adverse impact upon the public health or safety:
(A)Inconsistency with the zoning ordinance or general plan land use designation.
(B)The eligibility to claim a welfare exemption under subdivision (g) of Section 214 of the Revenue and Taxation Code.
(3)The denial of the housing development project or imposition of conditions is required in order to comply with specific state or federal law, and there is no feasible method to comply without rendering the development unaffordable to low- and moderate-income households or rendering the development of the emergency shelter financially infeasible.
(4)The housing development project or emergency shelter is proposed on land zoned for agriculture or resource preservation that is surrounded on at least two sides by land being used for agricultural or resource preservation purposes, or which does not have adequate water or wastewater facilities to serve the project.
(5)On the date an application for the housing development project or emergency shelter was deemed complete, the jurisdiction had adopted a revised housing element that was in substantial compliance with this article, and the housing development project or emergency shelter was inconsistent with both the jurisdictions zoning ordinance and general plan land use designation as specified in any element of the general plan.
(A)This paragraph shall not be utilized to disapprove or conditionally approve a housing development project proposed on a site, including a candidate site for rezoning, that is identified as suitable or available for very low, low-, or moderate-income households in the jurisdictions housing element if the housing development project is consistent with the density specified in the housing element, even though the housing development project was inconsistent with both the jurisdictions zoning ordinance and general plan land use designation on the date the application was deemed complete.
(B)If the local agency has failed to identify a zone or zones where emergency shelters are allowed as a permitted use without a conditional use or other discretionary permit, has failed to demonstrate that the identified zone or zones include sufficient capacity to accommodate the need for emergency shelter identified in paragraph (7) of subdivision (a) of Section 65583, or has failed to demonstrate that the identified zone or zones can accommodate at least one emergency shelter, as required by paragraph (4) of subdivision (a) of Section 65583, then this paragraph shall not be utilized to disapprove or conditionally approve an emergency shelter proposed for a site designated in any element of the general plan for industrial, commercial, or multifamily residential uses. In any action in court, the burden of proof shall be on the local agency to show that its housing element does satisfy the requirements of paragraph (4) of subdivision (a) of Section 65583.
(6)On the date an application for the housing development project or emergency shelter was deemed complete, the jurisdiction did not have an adopted revised housing element that was in substantial compliance with this article and the housing development project is not a builders remedy project.
(e)Nothing in this section shall be construed to relieve the local agency from complying with the congestion management program required by Chapter 2.6 (commencing with Section 65088) of Division 1 of Title 7 or the California Coastal Act of 1976 (Division 20 (commencing with Section 30000) of the Public Resources Code). Neither shall anything in this section be construed to relieve the local agency from making one or more of the findings required pursuant to Section 21081 of the Public Resources Code or otherwise complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(f)(1)Except as provided in paragraphs (6) and (8) of this subdivision, and subdivision (o), nothing in this section shall be construed to prohibit a local agency from requiring the housing development project to comply with objective, quantifiable, written development standards, conditions, and policies appropriate to, and consistent with, meeting the jurisdictions share of the regional housing need pursuant to Section 65584. However, the development standards, conditions, and policies shall be applied to facilitate and accommodate development at the density permitted on the site and proposed by the development. Nothing in this section shall limit a projects eligibility for a density bonus, incentive, or concession, or waiver or reduction of development standards and parking ratios, pursuant to Section 65915.
(2)Except as provided in subdivision (o), nothing in this section shall be construed to prohibit a local agency from requiring an emergency shelter project to comply with objective, quantifiable, written development standards, conditions, and policies that are consistent with paragraph (4) of subdivision (a) of Section 65583 and appropriate to, and consistent with, meeting the jurisdictions need for emergency shelter, as identified pursuant to paragraph (7) of subdivision (a) of Section 65583. However, the development standards, conditions, and policies shall be applied by the local agency to facilitate and accommodate the development of the emergency shelter project.
(3)Except as provided in subdivision (o), nothing in this section shall be construed to prohibit a local agency from imposing fees and other exactions otherwise authorized by law that are essential to provide necessary public services and facilities to the housing development project or emergency shelter.
(4)For purposes of this section, a housing development project or emergency shelter shall be deemed consistent, compliant, and in conformity with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision if there is substantial evidence that would allow a reasonable person to conclude that the housing development project or emergency shelter is consistent, compliant, or in conformity.
(5)For purposes of this section, a change to the zoning ordinance or general plan land use designation subsequent to the date the application was deemed complete shall not constitute a valid basis to disapprove or condition approval of the housing development project or emergency shelter.
(6)Notwithstanding paragraphs (1) to (5), inclusive, all of the following apply to a housing development project that is a builders remedy project:
(A)A local agency may only require the project to comply with the objective, quantifiable, written development standards, conditions, and policies that would have applied to the project had it been proposed on a site with a general plan designation and zoning classification that allow the density and unit type proposed by the applicant. If the local agency has no general plan designation or zoning classification that would have allowed the density and unit type proposed by the applicant, the development proponent may identify any objective, quantifiable, written development standards, conditions, and policies associated with a different general plan designation or zoning classification within that jurisdiction, that facilitate the projects density and unit type, and those shall apply.
(B)(i)Except as authorized by paragraphs (1) to (4), inclusive, of subdivision (d), a local agency shall not apply any individual or combination of objective, quantifiable, written development standards, conditions, and policies to the project that do any of the following:
(I)Render the project infeasible.
(II)Preclude a project that meets the requirements allowed to be imposed by subparagraph (A), as modified by any density bonus, incentive, or concession, or waiver or reduction of development standards and parking ratios, pursuant to Section 65915, from being constructed as proposed by the applicant.
(ii)The local agency shall bear the burden of proof of complying with clause (i).
(C)(i)A project applicant that qualifies for a density bonus pursuant to Section 65915 shall receive two incentives or concessions in addition to those granted pursuant to paragraph (2) of subdivision (d) of Section 65915.
(ii)For a project seeking density bonuses, incentives, concessions, or any other benefits pursuant to Section 65915, and notwithstanding paragraph (6) of subdivision (o) of Section 65915, for purposes of this paragraph, maximum allowable residential density or base density means the density permitted for a builders remedy project pursuant to subparagraph (C) of paragraph (11) of subdivision (h).
(iii)A local agency shall grant any density bonus pursuant to Section 65915 based on the number of units proposed and allowable pursuant to subparagraph (C) of paragraph (11) of subdivision (h).
(iv)A project that dedicates units to extremely low-income households pursuant to subclause (I) of clause (i) of subparagraph (C) of paragraph (3) of subdivision (h) shall be eligible for the same density bonus, incentives or concessions, and waivers or reductions of development standards as provided to a housing development project that dedicates three percentage points more units to very low income households pursuant to paragraph (2) of subdivision (f) of Section 65915.
(v)All units dedicated to extremely low-income, very low income, low-income, and moderate-income households pursuant to paragraph (11) of subdivision (h) shall be counted as affordable units in determining whether the applicant qualifies for a density bonus pursuant to Section 65915.
(D)(i)The project shall not be required to apply for, or receive approval of, a general plan amendment, specific plan amendment, rezoning, or other legislative approval.
(ii)The project shall not be required to apply for, or receive, any approval or permit not generally required of a project of the same type and density proposed by the applicant.
(iii)Any project that complies with this paragraph shall be deemed consistent, compliant, and in conformity with an applicable plan, program, policy, ordinance, standard, requirement, redevelopment plan and implementing instruments, or other similar provision for all purposes, and shall not be considered or treated as a nonconforming lot, use, or structure for any purpose.
(E)A local agency shall not adopt or impose any requirement, process, practice, or procedure or undertake any course of conduct, including, but not limited to, increased fees or inclusionary housing requirements, that applies to a project solely or partially on the basis that the project is a builders remedy project.
(F)(i)A builders remedy project shall be deemed to be in compliance with the residential density standards for the purposes of complying with subdivision (b) of Section 65912.123.
(ii)A builders remedy project shall be deemed to be in compliance with the objective zoning standards, objective subdivision standards, and objective design review standards for the purposes of complying with paragraph (5) of subdivision (a) of Section 65913.4.
(G)(i)(I)If the local agency had a local affordable housing requirement, as defined in Section 65912.101, that on January 1, 2024, required a greater percentage of affordable units than required under subparagraph (A) of paragraph (11) of subdivision (h), or required an affordability level deeper than what is required under subparagraph (A) of paragraph (11) of subdivision (h), then, except as provided in subclauses (II) and (III), the local agency may require a housing development for mixed-income households to comply with an otherwise lawfully applicable local affordability percentage or affordability level. The local agency shall not require housing for mixed-income households to comply with any other aspect of the local affordable housing requirement.
(II)Notwithstanding subclause (I), the local affordable housing requirements shall not be applied to require housing for mixed-income households to dedicate more than 20 percent of the units to affordable units of any kind.
(III)Housing for mixed-income households that is required to dedicate 20 percent of the units to affordable units shall not be required to dedicate any of the affordable units at an income level deeper than lower income households, as defined in Section 50079.5 of the Health and Safety Code.
(IV)A local agency may only require housing for mixed-income households to comply with the local percentage requirement or affordability level described in subclause (I) if it first makes written findings, supported by a preponderance of evidence, that compliance with the local percentage requirement or the affordability level, or both, would not render the housing development project infeasible. If a reasonable person could find compliance with either requirement, either alone or in combination, would render the project infeasible, the project shall not be required to comply with that requirement.
(ii)Affordable units in the development project shall have a comparable bedroom and bathroom count as the market rate units.
(iii)Each affordable unit dedicated pursuant to this subparagraph shall count toward satisfying a local affordable housing requirement. Each affordable unit dedicated pursuant to a local affordable housing requirement that meets the criteria established in this subparagraph shall count towards satisfying the requirements of this subparagraph. This is declaratory of existing law.
(7)(A)For a housing development project application that is deemed complete before January 1, 2025, the development proponent for the project may choose to be subject to the provisions of this section that were in place on the date the preliminary application was submitted, or, if the project meets the definition of a builders remedy project, it may choose to be subject to any or all of the provisions of this section applicable as of January 1, 2025.
(B)Notwithstanding subdivision (c) of Section 65941.1, for a housing development project deemed complete before January 1, 2025, the development proponent may choose to revise their application so that the project is a builders remedy project, without being required to resubmit a preliminary application, even if the revision results in the number of residential units or square footage of construction changing by 20 percent or more.
(8)A housing development project proposed on a site that is identified as suitable or available for very low, low-, or moderate-income households in the jurisdictions housing element, that is consistent with the density specified in the most recently updated and adopted housing element, and that is inconsistent with both the jurisdictions zoning ordinance and general plan land use designation on the date the application was deemed complete, shall be subject to the provisions of subparagraphs (A), (B), and (D) of paragraph (6) and paragraph (9).
(9)For purposes of this subdivision, objective, quantifiable, written development standards, conditions, and policies means criteria that involve no personal or subjective judgment by a public official and are uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official before submittal, including, but not limited to, any standard, ordinance, or policy described in paragraph (4) of subdivision (o). Nothing herein shall affect the obligation of the housing development project to comply with the minimum building standards approved by the California Building Standards Commission as provided in Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code. In the event that applicable objective, quantifiable, written development standards, conditions, and policies are mutually inconsistent, a development shall be deemed consistent with the criteria that permits the density and unit type closest to that of the proposed project.
(g)This section shall be applicable to charter cities because the Legislature finds that the lack of housing, including emergency shelter, is a critical statewide problem.
(h)The following definitions apply for the purposes of this section:
(1)Feasible means capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social, and technological factors.
(2)Housing development project means a use consisting of any of the following:
(A)Residential units only.
(B)Mixed-use developments consisting of residential and nonresidential uses that meet any of the following conditions:
(i)At least two-thirds of the new or converted square footage is designated for residential use.
(ii)At least 50 percent of the new or converted square footage is designated for residential use and the project meets both of the following:
(I)The project includes at least 500 net new residential units.
(II)No portion of the project is designated for use as a hotel, motel, bed and breakfast inn, or other transient lodging, except a portion of the project may be designated for use as a residential hotel, as defined in Section 50519 of the Health and Safety Code.
(iii)At least 50 percent of the net new or converted square footage is designated for residential use and the project meets all of the following:
(I)The project includes at least 500 net new residential units.
(II)The project involves the demolition or conversion of at least 100,000 square feet of nonresidential use.
(III)The project demolishes at least 50 percent of the existing nonresidential uses on the site.
(IV)No portion of the project is designated for use as a hotel, motel, bed and breakfast inn, or other transient lodging, except a portion of the project may be designated for use as a residential hotel, as defined in Section 50519 of the Health and Safety Code.
(C)Transitional housing or supportive housing.
(D)Farmworker housing, as defined in subdivision (h) of Section 50199.7 of the Health and Safety Code.
(3)(A)Housing for very low, low-, or moderate-income households means housing for lower income households, mixed-income households, or moderate-income households.
(B)Housing for lower income households means a housing development project in which 100 percent of the units, excluding managers units, are dedicated to lower income households, as defined in Section 50079.5 of the Health and Safety Code, at an affordable cost, as defined by Section 50052.5 of the Health and Safety Code, or an affordable rent set in an amount consistent with the rent limits established by the California Tax Credit Allocation Committee. The units shall be subject to a recorded deed restriction for a period of 55 years for rental units and 45 years for owner-occupied units.
(C)(i)Housing for mixed-income households means any of the following:
(I)A housing development project in which at least 7 percent of the total units, as defined in subparagraph (A) of paragraph (8) of subdivision (o) of Section 65915, are dedicated to extremely low income households, as defined in Section 50106 of the Health and Safety Code.
(II)A housing development project in which at least 10 percent of the total units, as defined in subparagraph (A) of paragraph (8) of subdivision (o) of Section 65915, are dedicated to very low income households, as defined in Section 50105 of the Health and Safety Code.
(III)A housing development project in which at least 13 percent of the total units, as defined in subparagraph (A) of paragraph (8) of subdivision (o) of Section 65915, are dedicated to lower income households, as defined in Section 50079.5 of the Health and Safety Code.
(IV)A housing development project in which there are 10 or fewer total units, as defined in subparagraph (A) of paragraph (8) of subdivision (o) of Section 65915, that is on a site that is smaller than one acre, and that is proposed for development at a minimum density of 10 units per acre.
(ii)All units dedicated to extremely low income, very low income, and low-income households pursuant to clause (i) shall meet both of the following:
(I)The units shall have an affordable housing cost, as defined in Section 50052.5 of the Health and Safety Code, or an affordable rent, as defined in Section 50053 of the Health and Safety Code.
(II)The development proponent shall agree to, and the local agency shall ensure, the continued affordability of all affordable rental units included pursuant to this section for 55 years and all affordable ownership units included pursuant to this section for a period of 45 years.
(D)Housing for moderate-income households means a housing development project in which 100 percent of the units are sold or rented to moderate-income households, as defined in Section 50093 of the Health and Safety Code, at an affordable housing cost, as defined in Section 50052.5 of the Health and Safety Code, or an affordable rent, as defined in Section 50053 of the Health and Safety Code. The units shall be subject to a recorded deed restriction for a period of 55 years for rental units and 45 years for owner-occupied units.
(4)Area median income means area median income as periodically established by the Department of Housing and Community Development pursuant to Section 50093 of the Health and Safety Code.
(5)Notwithstanding any other law, until January 1, 2030, deemed complete means that the applicant has submitted a preliminary application pursuant to Section 65941.1 or, if the applicant has not submitted a preliminary application, has submitted a complete application pursuant to Section 65943. The local agency shall bear the burden of proof in establishing that the application is not complete.
(6)Disapprove the housing development project includes any instance in which a local agency does any of the following:
(A)Votes or takes final administrative action on a proposed housing development project application and the application is disapproved, including any required land use approvals or entitlements necessary for the issuance of a building permit.
(B)Fails to comply with the time periods specified in subdivision (a) of Section 65950. An extension of time pursuant to Article 5 (commencing with Section 65950) shall be deemed to be an extension of time pursuant to this paragraph.
(C)Fails to comply with any provisions of Section 65913.3.
(D)Fails to cease a course of conduct undertaken for an improper purpose, such as to harass or to cause unnecessary delay or needless increases in the cost of the proposed housing development project, that effectively disapproves the proposed housing development without taking final administrative action if all of the following conditions are met:
(i)The project applicant provides written notice detailing the challenged conduct and why it constitutes disapproval to the local agency established under Section 65100.
(ii)Within five working days of receiving the applicants written notice described in clause (i), the local agency shall post the notice on the local agencys internet website, provide a copy of the notice to any person who has made a written request for notices pursuant to subdivision (f) of Section 21167 of the Public Resources Code, and file the notice with the county clerk of each county in which the project will be located. The county clerk shall post the notice and make it available for public inspection in the manner set forth in subdivision (c) of Section 21152 of the Public Resources Code.
(iii)The local agency shall consider all objections, comments, evidence, and concerns about the project or the applicants written notice and shall not make a determination until at least 60 days after the applicant has given written notice to the local agency pursuant to clause (i).
(iv)Within 90 days of receipt of the applicants written notice described in clause (i), the local agency shall issue a written statement that it will immediately cease the challenged conduct or issue written findings that comply with both of the following requirements:
(I)The findings articulate an objective basis for why the challenged course of conduct is necessary.
(II)The findings provide clear instructions on what the applicant must submit or supplement so that the local agency can make a final determination regarding the next necessary approval or set the date and time of the next hearing.
(v)(I)If a local agency continues the challenged course of conduct described in the applicants written notice and fails to issue the written findings described in clause (iv), the local agency shall bear the burden of establishing that its course of conduct does not constitute a disapproval of the housing development project under this subparagraph in an action taken by the applicant.
(II)If an applicant challenges a local agencys course of conduct as a disapproval under this subparagraph, the local agencys written findings described in clause (iv) shall be incorporated into the administrative record and be deemed to be the final administrative action for purposes of adjudicating whether the local agencys course of conduct constitutes a disapproval of the housing development project under this subparagraph.
(vi)A local agencys action in furtherance of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), including, but not limited to, imposing mitigating measures, shall not constitute project disapproval under this subparagraph.
(E)Fails to comply with Section 65905.5. For purposes of this subparagraph, a builders remedy project shall be deemed to comply with the applicable, objective general plan and zoning standards in effect at the time an application is deemed complete.
(F)(i)Determines that an application for a housing development project is incomplete pursuant to subdivision (a) or (b) of Section 65943 and includes in the determination an item that is not required on the local agencys submittal requirement checklist. The local agency shall bear the burden of proof that the required item is listed on the submittal requirement checklist.
(ii)In a subsequent review of an application pursuant to Section 65943, requests the applicant provide new information that was not identified in the initial determination and upholds this determination in the final written determination on an appeal filed pursuant to subdivision (c) of Section 65943. The local agency shall bear the burden of proof that the required item was identified in the initial determination.
(iii)Determines that an application for a housing development project is incomplete pursuant to subdivision (a) or (b) of Section 65943, a reasonable person would conclude that the applicant has submitted all of the items required on the local agencys submittal requirement checklist, and the local agency upholds this determination in the final written determination on an appeal filed pursuant to subdivision (c) of Section 65943.
(iv)If a local agency determines that an application is incomplete under Section 65943 after two resubmittals of the application by the applicant, the local agency shall bear the burden of establishing that the determination is not an effective disapproval of a housing development project under this section.
(G)Violates subparagraph (D) or (E) of paragraph (6) of subdivision (f).
(H)Makes a written determination that a preliminary application described in subdivision (a) of Section 65941.1 has expired or that the applicant has otherwise lost its vested rights under the preliminary application for any reason other than those described in subdivisions (c) and (d) of Section 65941.1.
(I)(i)Fails to make a determination of whether the project is exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), or commits an abuse of discretion, as defined in subdivision (b) of Section 65589.5.1 if all of the conditions in Section 65589.5.1 are satisfied.
(ii)This subparagraph shall become inoperative on January 1, 2031.
(J)(i)Fails to adopt a negative declaration or addendum for the project, to certify an environmental impact report for the project, or to approve another comparable environmental document, such as a sustainable communities environmental assessment pursuant to Section 21155.2 of the Public Resources Code, as required pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), if all of the conditions in Section 65589.5.2 are satisfied.
(ii)This subparagraph shall become inoperative on January 1, 2031.
(7)(A)For purposes of this section and Sections 65589.5.1 and 65589.5.2, lawful determination means any final decision about whether to approve or disapprove a statutory or categorical exemption or a negative declaration, addendum, environmental impact report, or comparable environmental review document under the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) that is not an abuse of discretion, as defined in subdivision (b) of Section 65589.5.1 or subdivision (b) of Section 65589.5.2.
(B)This paragraph shall become inoperative on January 1, 2031.
(8)Lower density includes any conditions that have the same effect or impact on the ability of the project to provide housing.
(9)Until January 1, 2030, objective means involving no personal or subjective judgment by a public official and being uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official.
(10)Notwithstanding any other law, until January 1, 2030, determined to be complete means that the applicant has submitted a complete application pursuant to Section 65943.
(11)Builders remedy project means a project that meets all of the following criteria:
(A)The project is a housing development project that provides housing for very low, low-, or moderate-income households.
(B)On or after the date an application for the housing development project or emergency shelter was deemed complete, the jurisdiction did not have a housing element that was in substantial compliance with this article.
(C)The project has a density such that the number of units, as calculated before the application of a density bonus pursuant to Section 65915, complies with all of the following conditions:
(i)The density does not exceed the greatest of the following densities:
(I)Fifty percent greater than the minimum density deemed appropriate to accommodate housing for that jurisdiction as specified in subparagraph (B) of paragraph (3) of subdivision (c) of Section 65583.2.
(II)Three times the density allowed by the general plan, zoning ordinance, or state law, whichever is greater.
(III)The density that is consistent with the density specified in the housing element.
(ii)Notwithstanding clause (i), the greatest allowable density shall be 35 units per acre more than the amount allowable pursuant to clause (i), if any portion of the site is located within any of the following:
(I)One-half mile of a major transit stop, as defined in Section 21064.3 of the Public Resources Code.
(II)A very low vehicle travel area, as defined in subdivision (h).
(III)A high or highest resource census tract, as identified by the latest edition of the CTCAC/HCD Opportunity Map published by the California Tax Credit Allocation Committee and the Department of Housing and Community Development.
(D)(i)On sites that have a minimum density requirement and are located within one-half mile of a commuter rail station or a heavy rail station, the density of the project shall not be less than the minimum density required on the site.
(I)For purposes of this subparagraph, commuter rail means a railway that is not a light rail, streetcar, trolley, or tramway and that is for urban passenger train service consisting of local short distance travel operating between a central city and adjacent suburb with service operated on a regular basis by or under contract with a transit operator for the purpose of transporting passengers within urbanized areas, or between urbanized areas and outlying areas, using either locomotive-hauled or self-propelled railroad passenger cars, with multitrip tickets and specific station-to-station fares.
(II)For purposes of this subparagraph, heavy rail means an electric railway with the capacity for a heavy volume of traffic using high speed and rapid acceleration passenger rail cars operating singly or in multicar trains on fixed rails, separate rights-of-way from which all other vehicular and foot traffic are excluded, and high platform loading.
(ii)On all other sites with a minimum density requirement, the density of the project shall not be less than the local agencys minimum density or one-half of the minimum density deemed appropriate to accommodate housing for that jurisdiction as specified in subparagraph (B) of paragraph (3) of subdivision (c) of Section 65583.2, whichever is lower.
(E)The project site does not abut a site where more than one-third of the square footage on the site has been used, within the past three years, by a heavy industrial use, or a Title V industrial use, as those terms are defined in Section 65913.16.
(12)Condition approval includes imposing on the housing development project, or attempting to subject it to, development standards, conditions, or policies.
(13)Unit type means the form of ownership and the kind of residential unit, including, but not limited to, single-family detached, single-family attached, for-sale, rental, multifamily, townhouse, condominium, apartment, manufactured homes and mobilehomes, factory-built housing, and residential hotel.
(14)Proposed by the applicant means the plans and designs as submitted by the applicant, including, but not limited to, density, unit size, unit type, site plan, building massing, floor area ratio, amenity areas, open space, parking, and ancillary commercial uses.
(i)If any city, county, or city and county denies approval or imposes conditions, including design changes, lower density, or a reduction of the percentage of a lot that may be occupied by a building or structure under the applicable planning and zoning in force at the time the housing development projects application is complete, that have a substantial adverse effect on the viability or affordability of a housing development for very low, low-, or moderate-income households, and the denial of the development or the imposition of conditions on the development is the subject of a court action which challenges the denial or the imposition of conditions, then the burden of proof shall be on the local legislative body to show that its decision is consistent with the findings as described in subdivision (d), and that the findings are supported by a preponderance of the evidence in the record, and with the requirements of subdivision (o).
(j)(1)When a proposed housing development project complies with applicable, objective general plan, zoning, and subdivision standards and criteria, including design review standards, in effect at the time that the application was deemed complete, but the local agency proposes to disapprove the project or to impose a condition that the project be developed at a lower density, the local agency shall base its decision regarding the proposed housing development project upon written findings supported by a preponderance of the evidence on the record that both of the following conditions exist:
(A)The housing development project would have a specific, adverse impact upon the public health or safety unless the project is disapproved or approved upon the condition that the project be developed at a lower density. As used in this paragraph, a specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(B)There is no feasible method to satisfactorily mitigate or avoid the adverse impact identified pursuant to paragraph (1), other than the disapproval of the housing development project or the approval of the project upon the condition that it be developed at a lower density.
(2)(A)If the local agency considers a proposed housing development project to be inconsistent, not in compliance, or not in conformity with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision as specified in this subdivision, it shall provide the applicant with written documentation identifying the provision or provisions, and an explanation of the reason or reasons it considers the housing development to be inconsistent, not in compliance, or not in conformity as follows:
(i)Within 30 days of the date that the application for the housing development project is determined to be complete, if the housing development project contains 150 or fewer housing units.
(ii)Within 60 days of the date that the application for the housing development project is determined to be complete, if the housing development project contains more than 150 units.
(B)If the local agency fails to provide the required documentation pursuant to subparagraph (A), the housing development project shall be deemed consistent, compliant, and in conformity with the applicable plan, program, policy, ordinance, standard, requirement, or other similar provision.
(3)For purposes of this section, the receipt of a density bonus, incentive, concession, waiver, or reduction of development standards pursuant to Section 65915 shall not constitute a valid basis on which to find a proposed housing development project is inconsistent, not in compliance, or not in conformity, with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision specified in this subdivision.
(4)For purposes of this section, a proposed housing development project is not inconsistent with the applicable zoning standards and criteria, and shall not require a rezoning, if the housing development project is consistent with the objective general plan standards and criteria but the zoning for the project site is inconsistent with the general plan. If the local agency has complied with paragraph (2), the local agency may require the proposed housing development project to comply with the objective standards and criteria of the zoning which is consistent with the general plan, however, the standards and criteria shall be applied to facilitate and accommodate development at the density allowed on the site by the general plan and proposed by the proposed housing development project.
(k)(1)(A)(i)The applicant, a person who would be eligible to apply for residency in the housing development project or emergency shelter, or a housing organization may bring an action to enforce this section. If, in any action brought to enforce this section, a court finds that any of the following are met, the court shall issue an order pursuant to clause (ii):
(I)The local agency, in violation of subdivision (d), disapproved a housing development project or conditioned its approval in a manner rendering it infeasible for the development of an emergency shelter, or housing for very low, low-, or moderate-income households, including farmworker housing, without making the findings required by this section.
(II)The local agency, in violation of subdivision (j), disapproved a housing development project complying with applicable, objective general plan and zoning standards and criteria, or imposed a condition that the project be developed at a lower density, without making the findings required by this section.
(III)(ia)Subject to sub-subclause (ib), the local agency, in violation of subdivision (o), required or attempted to require a housing development project to comply with an ordinance, policy, or standard not adopted and in effect when a preliminary application was submitted.
(ib)This subclause shall become inoperative on January 1, 2030.
(IV)The local agency violated a provision of this section applicable to a builders remedy project.
(ii)If the court finds that one of the conditions in clause (i) is met, the court shall issue an order or judgment compelling compliance with this section within a time period not to exceed 60 days, including, but not limited to, an order that the local agency take action on the housing development project or emergency shelter. The court may issue an order or judgment directing the local agency to approve the housing development project or emergency shelter if the court finds that the local agency acted in bad faith when it disapproved or conditionally approved the housing development or emergency shelter in violation of this section. The court shall retain jurisdiction to ensure that its order or judgment is carried out and shall award reasonable attorneys fees and costs of suit to the plaintiff or petitioner, provided, however, that the court shall not award attorneys fees in either of the following instances:
(I)The court finds, under extraordinary circumstances, that awarding fees would not further the purposes of this section.
(II)(ia)In a case concerning a disapproval within the meaning of subparagraph (I) or (J) of paragraph (6) of subdivision (h), the court finds that the local agency acted in good faith and had reasonable cause to disapprove the housing development project due to the existence of a controlling question of law about the application of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) or implementing guidelines as to which there was a substantial ground for difference of opinion at the time of the disapproval.
(ib)This subclause shall become inoperative on January 1, 2031.
(B)Upon a determination that the local agency has failed to comply with the order or judgment compelling compliance with this section within the time period prescribed by the court, the court shall impose fines on a local agency that has violated this section and require the local agency to deposit any fine levied pursuant to this subdivision into a local housing trust fund. The local agency may elect to instead deposit the fine into the Building Homes and Jobs Trust Fund. The fine shall be in a minimum amount of ten thousand dollars ($10,000) per housing unit in the housing development project on the date the application was deemed complete pursuant to Section 65943. In determining the amount of the fine to impose, the court shall consider the local agencys progress in attaining its target allocation of the regional housing need pursuant to Section 65584 and any prior violations of this section. Fines shall not be paid out of funds already dedicated to affordable housing, including, but not limited to, Low and Moderate Income Housing Asset Funds, funds dedicated to housing for very low, low-, and moderate-income households, and federal HOME Investment Partnerships Program and Community Development Block Grant Program funds. The local agency shall commit and expend the money in the local housing trust fund within five years for the sole purpose of financing newly constructed housing units affordable to extremely low, very low, or low-income households. After five years, if the funds have not been expended, the money shall revert to the state and be deposited in the Building Homes and Jobs Trust Fund for the sole purpose of financing newly constructed housing units affordable to extremely low, very low, or low-income households.
(C)If the court determines that its order or judgment has not been carried out within 60 days, the court may issue further orders as provided by law to ensure that the purposes and policies of this section are fulfilled, including, but not limited to, an order to vacate the decision of the local agency and to approve the housing development project, in which case the application for the housing development project, as proposed by the applicant at the time the local agency took the initial action determined to be in violation of this section, along with any standard conditions determined by the court to be generally imposed by the local agency on similar projects, shall be deemed to be approved unless the applicant consents to a different decision or action by the local agency.
(D)Nothing in this section shall limit the courts inherent authority to make any other orders to compel the immediate enforcement of any writ brought under this section, including the imposition of fees and other sanctions set forth under Section 1097 of the Code of Civil Procedure.
(2)For purposes of this subdivision, housing organization means a trade or industry group whose local members are primarily engaged in the construction or management of housing units or a nonprofit organization whose mission includes providing or advocating for increased access to housing for low-income households and have filed written or oral comments with the local agency prior to action on the housing development project. A housing organization may only file an action pursuant to this section to challenge the disapproval of a housing development by a local agency. A housing organization shall be entitled to reasonable attorneys fees and costs if it is the prevailing party in an action to enforce this section.
(l)If the court finds that the local agency (1) acted in bad faith when it violated this section and (2) failed to carry out the courts order or judgment within the time period prescribed by the court, the court, in addition to any other remedies provided by this section, shall multiply the fine determined pursuant to subparagraph (B) of paragraph (1) of subdivision (k) by a factor of five. If a court has previously found that the local agency violated this section within the same planning period, the court shall multiply the fines by an additional factor for each previous violation. For purposes of this section, bad faith includes, but is not limited to, an action or inaction that is frivolous, pretextual, intended to cause unnecessary delay, or entirely without merit.
(m)(1)Any action brought to enforce the provisions of this section shall be brought pursuant to Section 1094.5 of the Code of Civil Procedure, and the local agency shall prepare and certify the record of proceedings in accordance with subdivision (c) of Section 1094.6 of the Code of Civil Procedure no later than 30 days after the petition is served, provided that the cost of preparation of the record shall be borne by the local agency, unless the petitioner elects to prepare the record as provided in subdivision (n) of this section. A petition to enforce the provisions of this section shall be filed and served no later than 90 days from the later of (1) the effective date of a decision of the local agency imposing conditions on, disapproving, or any other final action on a housing development project or (2) the expiration of the time periods specified in subparagraph (B) of paragraph (5) of subdivision (h). Upon entry of the trial courts order, a party may, in order to obtain appellate review of the order, file a petition within 20 days after service upon it of a written notice of the entry of the order, or within such further time not exceeding an additional 20 days as the trial court may for good cause allow, or may appeal the judgment or order of the trial court under Section 904.1 of the Code of Civil Procedure. If the local agency appeals the judgment of the trial court, the local agency shall post a bond, in an amount to be determined by the court, to the benefit of the plaintiff if the plaintiff is the project applicant.
(2)(A)A disapproval within the meaning of subparagraph (I) of paragraph (6) of subdivision (h) shall be final for purposes of this subdivision, if the local agency did not make a lawful determination within the time period set forth in paragraph (5) of subdivision (a) of Section 65589.5.1 after the applicants timely written notice.
(B)This paragraph shall become inoperative on January 1, 2031.
(3)(A)A disapproval within the meaning of subparagraph (J) of paragraph (6) of subdivision (h) shall be final for purposes of this subdivision, if the local agency did not make a lawful determination within 90 days of the applicants timely written notice.
(B)This paragraph shall become inoperative on January 1, 2031.
(n)In any action, the record of the proceedings before the local agency shall be filed as expeditiously as possible and, notwithstanding Section 1094.6 of the Code of Civil Procedure or subdivision (m) of this section, all or part of the record may be prepared (1) by the petitioner with the petition or petitioners points and authorities, (2) by the respondent with respondents points and authorities, (3) after payment of costs by the petitioner, or (4) as otherwise directed by the court. If the expense of preparing the record has been borne by the petitioner and the petitioner is the prevailing party, the expense shall be taxable as costs.
(o)(1)Subject to paragraphs (2), (6), and (7), and subdivision (d) of Section 65941.1, a housing development project shall be subject only to the ordinances, policies, and standards adopted and in effect when a preliminary application including all of the information required by subdivision (a) of Section 65941.1 was submitted.
(2)Paragraph (1) shall not prohibit a housing development project from being subject to ordinances, policies, and standards adopted after the preliminary application was submitted pursuant to Section 65941.1 in the following circumstances:
(A)In the case of a fee, charge, or other monetary exaction, to an increase resulting from an automatic annual adjustment based on an independently published cost index that is referenced in the ordinance or resolution establishing the fee or other monetary exaction.
(B)A preponderance of the evidence in the record establishes that subjecting the housing development project to an ordinance, policy, or standard beyond those in effect when a preliminary application was submitted is necessary to mitigate or avoid a specific, adverse impact upon the public health or safety, as defined in subparagraph (A) of paragraph (1) of subdivision (j), and there is no feasible alternative method to satisfactorily mitigate or avoid the adverse impact.
(C)Subjecting the housing development project to an ordinance, policy, standard, or any other measure, beyond those in effect when a preliminary application was submitted is necessary to avoid or substantially lessen an impact of the project under the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(D)The housing development project has not commenced construction within two and one-half years, or three and one-half years for an affordable housing project, following the date that the project received final approval. For purposes of this subparagraph:
(i)Affordable housing project means a housing development that satisfies both of the following requirements:
(I)Units within the development are subject to a recorded affordability restriction for at least 55 years for rental housing and 45 years for owner-occupied housing, or the first purchaser of each unit participates in an equity sharing agreement as described in subparagraph (C) of paragraph (2) of subdivision (c) of Section 65915.
(II)All of the units within the development, excluding managers units, are dedicated to lower income households, as defined by Section 50079.5 of the Health and Safety Code.
(ii)Final approval means that the housing development project has received all necessary approvals to be eligible to apply for, and obtain, a building permit or permits and either of the following is met:
(I)The expiration of all applicable appeal periods, petition periods, reconsideration periods, or statute of limitations for challenging that final approval without an appeal, petition, request for reconsideration, or legal challenge having been filed.
(II)If a challenge is filed, that challenge is fully resolved or settled in favor of the housing development project.
(E)The housing development project is revised following submittal of a preliminary application pursuant to Section 65941.1 such that the number of residential units or square footage of construction changes by 20 percent or more, exclusive of any increase resulting from the receipt of a density bonus, incentive, concession, waiver, or similar provision, including any other locally authorized program that offers additional density or other development bonuses when affordable housing is provided. For purposes of this subdivision, square footage of construction means the building area, as defined by the California Building Standards Code (Title 24 of the California Code of Regulations).
(3)This subdivision does not prevent a local agency from subjecting the additional units or square footage of construction that result from project revisions occurring after a preliminary application is submitted pursuant to Section 65941.1 to the ordinances, policies, and standards adopted and in effect when the preliminary application was submitted.
(4)For purposes of this subdivision, ordinances, policies, and standards includes general plan, community plan, specific plan, zoning, design review standards and criteria, subdivision standards and criteria, and any other rules, regulations, requirements, and policies of a local agency, as defined in Section 66000, including those relating to development impact fees, capacity or connection fees or charges, permit or processing fees, and other exactions.
(5)This subdivision shall not be construed in a manner that would lessen the restrictions imposed on a local agency, or lessen the protections afforded to a housing development project, that are established by any other law, including any other part of this section.
(6)This subdivision shall not restrict the authority of a public agency or local agency to require mitigation measures to lessen the impacts of a housing development project under the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(7)With respect to completed residential units for which the project approval process is complete and a certificate of occupancy has been issued, nothing in this subdivision shall limit the application of later enacted ordinances, policies, and standards that regulate the use and occupancy of those residential units, such as ordinances relating to rental housing inspection, rent stabilization, restrictions on short-term renting, and business licensing requirements for owners of rental housing.
(8)(A)This subdivision shall apply to a housing development project that submits a preliminary application pursuant to Section 65941.1 before January 1, 2030.
(B)This subdivision shall become inoperative on January 1, 2034.
(p)(1)Upon any motion for an award of attorneys fees pursuant to Section 1021.5 of the Code of Civil Procedure, in a case challenging a local agencys approval of a housing development project, a court, in weighing whether a significant benefit has been conferred on the general public or a large class of persons and whether the necessity of private enforcement makes the award appropriate, shall give due weight to the degree to which the local agencys approval furthers policies of this section, including, but not limited to, subdivisions (a), (b), and (c), the suitability of the site for a housing development, and the reasonableness of the decision of the local agency. It is the intent of the Legislature that attorneys fees and costs shall rarely, if ever, be awarded if a local agency, acting in good faith, approved a housing development project that satisfies conditions established in paragraph (1), (2), or (3) of subdivision (a) of Section 65589.5.1 or paragraph (1), (2), or (3) of subdivision (a) of Section 65589.5.2.
(2)This subdivision shall become inoperative on January 1, 2031.
(q)This section shall be known, and may be cited, as the Housing Accountability Act.
(r)The provisions of this section are severable. If any provision of this section or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
SEC. 2.Section 65913.3 of the Government Code is amended to read:65913.3.(a)(1)A local agency shall compile one or more lists that shall specify in detail the information that will be required from any applicant for a postentitlement phase permit. The local agency may revise the lists of information required from an applicant. Any revised list shall not apply to any permit pending review.
(2)A local agency shall post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least five types of housing development projects in the jurisdiction, including, but not limited to, accessory dwelling unit, duplex, multifamily, mixed use, and townhome.
(3)A local agency shall make the items required by paragraphs (1) and (2) available on the agencys internet website no later than January 1, 2024.
(b)(1)(A)A local agency shall determine whether an application for a postentitlement phase permit is complete and provide written notice of this determination to the applicant not later than 15 business days after the local agency received the application.
(B)If the local agency determines an application is incomplete, the local agency shall provide the applicant with a list of incomplete items and a description of how the application can be made complete. The list shall be limited to incomplete items that are included on the lists required by paragraph (1) of subdivision (a). The list and description shall be provided with the written notice required by subparagraph (A).
(2)(A)After receiving a notice that the application was incomplete, an applicant may cure and address the items that are deemed to be incomplete by the local agency.
(B)In the review of an application submitted pursuant to subparagraph (A), the local agency shall not require the application to include an item that was not included in the list required by subparagraph (B) of paragraph (1).
(C)If an applicant submits an application pursuant to subparagraph (A), the local agency shall determine whether the additional application has remedied all incomplete items listed in the determination issued pursuant to subparagraph (B) of paragraph (1). This additional application is subject to the timelines and requirements specified in subparagraph (A) of paragraph (1).
(3)If a local agency does not make a timely determination as required by paragraph (1) or (2) and the application or resubmitted application states that it is for a postentitlement phase permit, the application or resubmitted application shall be deemed to be complete for the purposes of this chapter.
(c)(1)(A)For housing development projects with 25 units or fewer, a local agency shall complete the review and do either of the following:
(i)If the local agency determines that the complete application is not compliant with the permit standards, return in writing a full set of comments to the applicant with a comprehensive request for revisions.
(ii)If the local agency determines that the complete application is compliant with the permit standards, return the approved permit application on each postentitlement phase permit requested.
(B)The local agency shall immediately transmit that determination to the applicant by electronic mail and, if applicable, by posting the response on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 not later than 30 business days after the local agency determines that an application for a postentitlement phase permit is complete pursuant to subdivision (b).
(C)(i)As part of its review, the local agency shall not require or request more than two plan check and specification reviews in connection with an application for a building permit, unless the local agencys requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety.
(ii)A local agency may deny an application that is not compliant with the permit standards following two submittals.
(iii)An applicant may request additional submittals of applications that are not compliant with the permit standards.
(iv)This subparagraph shall not be construed to affect the number of submittals that a local agency may require or request for any postentitlement phase permit other than a building permit.
(2)(A)For housing development projects with 26 units or more, a local agency shall complete the review and do either of the following:
(i)If the local agency determines that the complete application is not compliant with the permit standards, return in writing a full set of comments to the applicant with a comprehensive request for revisions.
(ii)If the local agency determines that the complete application is compliant with the permit standards, return the approved permit application on each postentitlement phase permit requested.
(B)The local agency shall immediately transmit that determination to the applicant by electronic mail and, if applicable, by posting the response on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 not later than 60 business days after the local agency determines that an application for a postentitlement phase permit is complete pursuant to subdivision (b).
(C)(i)As part of its review, the local agency shall not require or request more than two plan check and specification reviews in connection with an application for a building permit, unless the local agencys requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety.
(ii)A local agency may deny an application that is not compliant with the permit standards following two submittals.
(iii)An applicant may request additional submittals of applications that are not compliant with the permit standards.
(iv)This subparagraph shall not be construed to affect the number of submittals that a local agency may require or request for any postentitlement phase permit other than a building permit.
(3)Once a local agency determines that a postentitlement permit is compliant with applicable permit standards pursuant to paragraph (1) or (2), the local agency shall not subject the postentitlement phase permit to any appeals or additional hearing requirements.
(4)The time limits in this subdivision shall not apply if the local agency makes written findings within the time limits specified in paragraph (1) or (2) based on substantial evidence in the record that the proposed postentitlement phase permit might have a specific, adverse impact on public health or safety and that additional time is necessary to process the application.
(d)(1)If a local agency finds that a complete application is noncompliant, the local agency shall provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within the time limits specified in subdivision (c).
(2)The local agency shall provide the list and description authorized by paragraph (1) when it transmits its determination to the applicant as required by subdivision (c).
(3)If a local agency denies a postentitlement phase permit application based on a determination that the application is noncompliant, the applicant may attempt to remedy the application.
(4)If an applicant submits an application pursuant to paragraph (3), the additional application is subject to the timelines of a new application as specified in subdivision (c).
(5)The local agency shall not request or require any action or inaction as a result of a building inspection undertaken to assess compliance with the applicable building permit standards that would represent a deviation from a previously approved building plan or similar approval for the building permit, unless the local agencys requirement or request is accompanied by written findings based on substantial evidence in the record that both of the following apply:
(A)A reasonable person could not interpret the previously approved building plan or similar approval as being compliant with the applicable standards for the building permit.
(B)The deviation is necessary to address a specific, adverse impact on public health or safety.
(e)(1)If a postentitlement phase permit is determined to be incomplete under subdivision (b) or denied or determined to be noncompliant under subdivision (c) or (d), the local agency shall provide a process for the applicant to appeal that decision in writing to the governing body of the agency or, if there is no governing body, to the director of the agency, as provided by that agency. agency.
(2)(A)With respect to a postentitlement phase permit concerning housing development projects with 25 units or fewer, a local agency on the appeal shall provide a final written determination by not later than 30 business days after receipt of the applicants written appeal.
(B)With respect to a postentitlement phase permit concerning housing development projects with 26 units or more, a local agency on the appeal shall provide a final written determination by not later than 45 business days after receipt of the applicants written appeal.
(3)If the applicants appeal pursuant to this subdivision is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required, the applicant may seek a writ of mandate to compel approval of the application. The writ of mandate shall be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
(f)If a local agency violates this section, it shall be in violation of Section 65589.5.
(g)Except as provided in subparagraph (D) of paragraph (1) of, and subparagraph (D) of paragraph (2) of, subdivision (c), this section does not place limitations on the amount of feedback that a local agency may provide or revisions that a local agency may request of an applicant.
(h)For residential or residential mixed-use developments that are subject to the requirements set forth in Section 65913.4, the provisions of paragraph (2) of subdivision (h) of Section 65913.4 shall apply. Permits for these developments that are subject to paragraph (2) of subdivision (h) of Section 65913.4 shall not be in conflict with the requirements of this section. The local agency shall comply with both sets of standards.
(i)This section does not preclude an applicant and a local agency from mutually agreeing to an extension of any time limit provided by this section. However, a local agency shall not require an agreement as a condition of accepting the application for, or processing of, a postentitlement phase permit, unless the agreement is obtained for the purpose of permitting concurrent processing of related approvals or an environmental review on the same housing development project.
(j)For purposes of this section, the following definitions apply:
(1)Housing development project has the same meaning as in paragraph (3) of subdivision (b) of Section 65905.5.
(2)Local agency means any county, city, or city and county.
(3)(A)Postentitlement phase permit includes both of the following:
(i)All nondiscretionary permits and reviews that are required or issued by the local agency after the entitlement process has been completed to begin construction of a development that is intended to be at least two-thirds residential, excluding discretionary and ministerial planning permits, entitlements, and other permits and reviews that are covered under Chapter 4.5 (commencing with Section 65920). A postentitlement phase permit includes, but is not limited to, all of the following:
(I)Building permits, and all interdepartmental review required for the issuance of a building permit, including plan checking and building inspection.
(II)Permits for minor or standard off-site improvements.
(III)Permits for demolition.
(IV)Permits for minor or standard excavation and grading.
(ii)All building permits and other permits issued under the California Building Standards Code (Title 24 of the California Code of Regulations) or any applicable local building code for the construction, demolition, or alteration of buildings, whether discretionary or nondiscretionary.
(B)A local agency may identify by ordinance a threshold for determining whether a permit constitutes a minor or standard permit for the purposes of this paragraph, which shall be supported by written findings adopted by the jurisdiction.
(C)A postentitlement phase permit does not include a permit required and issued by the California Coastal Commission, a special district, a utility that is not owned and operated by a local agency, or any other entity that is not a city, county, or city and county.
(4)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
SEC. 3.The amendments of paragraph (5) of subdivision (d) of, and subclause (I) of clause (i) of subparagraph (A) of paragraph (3) of subdivision (j) of, of Section 65913.3 of the Government Code made by this act do not constitute a change in, but are declaratory of, existing law.
SEC. 4.The Legislature finds and declares that Section 2 of this act amending Section 65913.3 of the Government Code addresses a matter of statewide concern rather than a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 2 of this act applies to all cities, including charter cities.
SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)(1)The Legislature finds and declares all of the following:
(A)The lack of housing, including emergency shelters, is a critical problem that threatens the economic, environmental, and social quality of life in California.
(B)California housing has become the most expensive in the nation. The excessive cost of the states housing supply is partially caused by activities and policies of many local governments that limit the approval of housing, increase the cost of land for housing, and require that high fees and exactions be paid by producers of housing.
(C)Among the consequences of those actions are discrimination against low-income and minority households, lack of housing to support employment growth, imbalance in jobs and housing, reduced mobility, urban sprawl, excessive commuting, and air quality deterioration.
(D)Many local governments do not give adequate attention to the economic, environmental, and social costs of decisions that result in disapproval of housing development projects, reduction in density of housing projects, and excessive standards for housing development projects.
(2)In enacting the amendments made to this section by the act adding this paragraph, the Legislature further finds and declares the following:
(A)California has a housing supply and affordability crisis of historic proportions. The consequences of failing to effectively and aggressively confront this crisis are hurting millions of Californians, robbing future generations of the chance to call California home, stifling economic opportunities for workers and businesses, worsening poverty and homelessness, and undermining the states environmental and climate objectives.
(B)While the causes of this crisis are multiple and complex, the absence of meaningful and effective policy reforms to significantly enhance the approval and supply of housing affordable to Californians of all income levels is a key factor.
(C)The crisis has grown so acute in California that supply, demand, and affordability fundamentals are characterized in the negative: underserved demands, constrained supply, and protracted unaffordability.
(D)According to reports and data, California has accumulated an unmet housing backlog of nearly 2,000,000 units and must provide for at least 180,000 new units annually to keep pace with growth through 2025.
(E)Californias overall home ownership rate is at its lowest level since the 1940s. The state ranks 49th out of the 50 states in home ownership rates as well as in the supply of housing per capita. Only one-half of Californias households are able to afford the cost of housing in their local regions.
(F)Lack of supply and rising costs are compounding inequality and limiting advancement opportunities for many Californians.
(G)The majority of California renters, more than 3,000,000 households, pay more than 30 percent of their income toward rent and nearly one-third, more than 1,500,000 households, pay more than 50 percent of their income toward rent.
(H)When Californians have access to safe and affordable housing, they have more money for food and health care; they are less likely to become homeless and in need of government-subsidized services; their children do better in school; and businesses have an easier time recruiting and retaining employees.
(I)An additional consequence of the states cumulative housing shortage is a significant increase in greenhouse gas emissions caused by the displacement and redirection of populations to states with greater housing opportunities, particularly working- and middle-class households. Californias cumulative housing shortfall therefore has not only national but international environmental consequences.
(J)Californias housing picture has reached a crisis of historic proportions despite the fact that, for decades, the Legislature has enacted numerous statutes intended to significantly increase the approval, development, and affordability of housing for all income levels, including this section.
(K)The Legislatures intent in enacting this section in 1982 and in expanding its provisions since then was to significantly increase the approval and construction of new housing for all economic segments of Californias communities by meaningfully and effectively curbing the capability of local governments to deny, reduce the density for, or render infeasible housing development projects and emergency shelters. That intent has not been fulfilled.
(L)It is the policy of the state that this section be interpreted and implemented in a manner to afford the fullest possible weight to the interest of, and the approval and provision of, housing.
(3)It is the intent of the Legislature that the conditions that would have a specific, adverse impact upon the public health and safety, as described in paragraph (2) of subdivision (d) and paragraph (1) of subdivision (j), arise infrequently.
(4)It is the intent of the Legislature that the amendments removing provisions from subparagraphs (D) and (E) of paragraph (6) of subdivision (h) and adding those provisions to Sections 65589.5.1 and 65589.5.2 by Assembly Bill 1413 (2023), insofar as they are substantially the same as existing law, shall be considered restatements and continuations of existing law, and not new enactments.
(b)It is the policy of the state that a local government not reject or make infeasible housing development projects, including emergency shelters, that contribute to meeting the need determined pursuant to this article without a thorough analysis of the economic, social, and environmental effects of the action and without complying with subdivision (d).
(c)The Legislature also recognizes that premature and unnecessary development of agricultural lands for urban uses continues to have adverse effects on the availability of those lands for food and fiber production and on the economy of the state. Furthermore, it is the policy of the state that development should be guided away from prime agricultural lands; therefore, in implementing this section, local jurisdictions should encourage, to the maximum extent practicable, in filling existing urban areas.
(d)For a housing development project for very low, low-, or moderate-income households, or an emergency shelter, a local agency shall not disapprove the housing development project or emergency shelter, or condition approval in a manner that renders the housing development project or emergency shelter infeasible, including through the use of design review standards, unless it makes written findings, based upon a preponderance of the evidence in the record, as to one of the following:
(1)The jurisdiction has adopted a housing element pursuant to this article that has been revised in accordance with Section 65588, is in substantial compliance with this article, and the jurisdiction has met or exceeded its share of the regional housing need allocation pursuant to Section 65584 for the planning period for the income category proposed for the housing development project, provided that any disapproval or conditional approval shall not be based on any of the reasons prohibited by Section 65008. If the housing development project includes a mix of income categories, and the jurisdiction has not met or exceeded its share of the regional housing need for one or more of those categories, then this paragraph shall not be used to disapprove or conditionally approve the housing development project. The share of the regional housing need met by the jurisdiction shall be calculated consistently with the forms and definitions that may be adopted by the Department of Housing and Community Development pursuant to Section 65400. In the case of an emergency shelter, the jurisdiction shall have met or exceeded the need for emergency shelter, as identified pursuant to paragraph (7) of subdivision (a) of Section 65583. Any disapproval or conditional approval pursuant to this paragraph shall be in accordance with applicable law, rule, or standards.
(2)The housing development project or emergency shelter as proposed would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact without rendering the development unaffordable to low- and moderate-income households or rendering the development of the emergency shelter financially infeasible. As used in this paragraph, a specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete. The following shall not constitute a specific, adverse impact upon the public health or safety:
(A)Inconsistency with the zoning ordinance or general plan land use designation.
(B)The eligibility to claim a welfare exemption under subdivision (g) of Section 214 of the Revenue and Taxation Code.
(3)The denial of the housing development project or imposition of conditions is required in order to comply with specific state or federal law, and there is no feasible method to comply without rendering the development unaffordable to low- and moderate-income households or rendering the development of the emergency shelter financially infeasible.
(4)The housing development project or emergency shelter is proposed on land zoned for agriculture or resource preservation that is surrounded on at least two sides by land being used for agricultural or resource preservation purposes, or which does not have adequate water or wastewater facilities to serve the project.
(5)On the date an application for the housing development project or emergency shelter was deemed complete, the jurisdiction had adopted a revised housing element that was in substantial compliance with this article, and the housing development project or emergency shelter was inconsistent with both the jurisdictions zoning ordinance and general plan land use designation as specified in any element of the general plan.
(A)This paragraph shall not be utilized to disapprove or conditionally approve a housing development project proposed on a site, including a candidate site for rezoning, that is identified as suitable or available for very low, low-, or moderate-income households in the jurisdictions housing element if the housing development project is consistent with the density specified in the housing element, even though the housing development project was inconsistent with both the jurisdictions zoning ordinance and general plan land use designation on the date the application was deemed complete.
(B)If the local agency has failed to identify a zone or zones where emergency shelters are allowed as a permitted use without a conditional use or other discretionary permit, has failed to demonstrate that the identified zone or zones include sufficient capacity to accommodate the need for emergency shelter identified in paragraph (7) of subdivision (a) of Section 65583, or has failed to demonstrate that the identified zone or zones can accommodate at least one emergency shelter, as required by paragraph (4) of subdivision (a) of Section 65583, then this paragraph shall not be utilized to disapprove or conditionally approve an emergency shelter proposed for a site designated in any element of the general plan for industrial, commercial, or multifamily residential uses. In any action in court, the burden of proof shall be on the local agency to show that its housing element does satisfy the requirements of paragraph (4) of subdivision (a) of Section 65583.
(6)On the date an application for the housing development project or emergency shelter was deemed complete, the jurisdiction did not have an adopted revised housing element that was in substantial compliance with this article and the housing development project is not a builders remedy project.
(e)Nothing in this section shall be construed to relieve the local agency from complying with the congestion management program required by Chapter 2.6 (commencing with Section 65088) of Division 1 of Title 7 or the California Coastal Act of 1976 (Division 20 (commencing with Section 30000) of the Public Resources Code). Neither shall anything in this section be construed to relieve the local agency from making one or more of the findings required pursuant to Section 21081 of the Public Resources Code or otherwise complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(f)(1)Except as provided in paragraphs (6) and (8) of this subdivision, and subdivision (o), nothing in this section shall be construed to prohibit a local agency from requiring the housing development project to comply with objective, quantifiable, written development standards, conditions, and policies appropriate to, and consistent with, meeting the jurisdictions share of the regional housing need pursuant to Section 65584. However, the development standards, conditions, and policies shall be applied to facilitate and accommodate development at the density permitted on the site and proposed by the development. Nothing in this section shall limit a projects eligibility for a density bonus, incentive, or concession, or waiver or reduction of development standards and parking ratios, pursuant to Section 65915.
(2)Except as provided in subdivision (o), nothing in this section shall be construed to prohibit a local agency from requiring an emergency shelter project to comply with objective, quantifiable, written development standards, conditions, and policies that are consistent with paragraph (4) of subdivision (a) of Section 65583 and appropriate to, and consistent with, meeting the jurisdictions need for emergency shelter, as identified pursuant to paragraph (7) of subdivision (a) of Section 65583. However, the development standards, conditions, and policies shall be applied by the local agency to facilitate and accommodate the development of the emergency shelter project.
(3)Except as provided in subdivision (o), nothing in this section shall be construed to prohibit a local agency from imposing fees and other exactions otherwise authorized by law that are essential to provide necessary public services and facilities to the housing development project or emergency shelter.
(4)For purposes of this section, a housing development project or emergency shelter shall be deemed consistent, compliant, and in conformity with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision if there is substantial evidence that would allow a reasonable person to conclude that the housing development project or emergency shelter is consistent, compliant, or in conformity.
(5)For purposes of this section, a change to the zoning ordinance or general plan land use designation subsequent to the date the application was deemed complete shall not constitute a valid basis to disapprove or condition approval of the housing development project or emergency shelter.
(6)Notwithstanding paragraphs (1) to (5), inclusive, all of the following apply to a housing development project that is a builders remedy project:
(A)A local agency may only require the project to comply with the objective, quantifiable, written development standards, conditions, and policies that would have applied to the project had it been proposed on a site with a general plan designation and zoning classification that allow the density and unit type proposed by the applicant. If the local agency has no general plan designation or zoning classification that would have allowed the density and unit type proposed by the applicant, the development proponent may identify any objective, quantifiable, written development standards, conditions, and policies associated with a different general plan designation or zoning classification within that jurisdiction, that facilitate the projects density and unit type, and those shall apply.
(B)(i)Except as authorized by paragraphs (1) to (4), inclusive, of subdivision (d), a local agency shall not apply any individual or combination of objective, quantifiable, written development standards, conditions, and policies to the project that do any of the following:
(I)Render the project infeasible.
(II)Preclude a project that meets the requirements allowed to be imposed by subparagraph (A), as modified by any density bonus, incentive, or concession, or waiver or reduction of development standards and parking ratios, pursuant to Section 65915, from being constructed as proposed by the applicant.
(ii)The local agency shall bear the burden of proof of complying with clause (i).
(C)(i)A project applicant that qualifies for a density bonus pursuant to Section 65915 shall receive two incentives or concessions in addition to those granted pursuant to paragraph (2) of subdivision (d) of Section 65915.
(ii)For a project seeking density bonuses, incentives, concessions, or any other benefits pursuant to Section 65915, and notwithstanding paragraph (6) of subdivision (o) of Section 65915, for purposes of this paragraph, maximum allowable residential density or base density means the density permitted for a builders remedy project pursuant to subparagraph (C) of paragraph (11) of subdivision (h).
(iii)A local agency shall grant any density bonus pursuant to Section 65915 based on the number of units proposed and allowable pursuant to subparagraph (C) of paragraph (11) of subdivision (h).
(iv)A project that dedicates units to extremely low-income households pursuant to subclause (I) of clause (i) of subparagraph (C) of paragraph (3) of subdivision (h) shall be eligible for the same density bonus, incentives or concessions, and waivers or reductions of development standards as provided to a housing development project that dedicates three percentage points more units to very low income households pursuant to paragraph (2) of subdivision (f) of Section 65915.
(v)All units dedicated to extremely low-income, very low income, low-income, and moderate-income households pursuant to paragraph (11) of subdivision (h) shall be counted as affordable units in determining whether the applicant qualifies for a density bonus pursuant to Section 65915.
(D)(i)The project shall not be required to apply for, or receive approval of, a general plan amendment, specific plan amendment, rezoning, or other legislative approval.
(ii)The project shall not be required to apply for, or receive, any approval or permit not generally required of a project of the same type and density proposed by the applicant.
(iii)Any project that complies with this paragraph shall be deemed consistent, compliant, and in conformity with an applicable plan, program, policy, ordinance, standard, requirement, redevelopment plan and implementing instruments, or other similar provision for all purposes, and shall not be considered or treated as a nonconforming lot, use, or structure for any purpose.
(E)A local agency shall not adopt or impose any requirement, process, practice, or procedure or undertake any course of conduct, including, but not limited to, increased fees or inclusionary housing requirements, that applies to a project solely or partially on the basis that the project is a builders remedy project.
(F)(i)A builders remedy project shall be deemed to be in compliance with the residential density standards for the purposes of complying with subdivision (b) of Section 65912.123.
(ii)A builders remedy project shall be deemed to be in compliance with the objective zoning standards, objective subdivision standards, and objective design review standards for the purposes of complying with paragraph (5) of subdivision (a) of Section 65913.4.
(G)(i)(I)If the local agency had a local affordable housing requirement, as defined in Section 65912.101, that on January 1, 2024, required a greater percentage of affordable units than required under subparagraph (A) of paragraph (11) of subdivision (h), or required an affordability level deeper than what is required under subparagraph (A) of paragraph (11) of subdivision (h), then, except as provided in subclauses (II) and (III), the local agency may require a housing development for mixed-income households to comply with an otherwise lawfully applicable local affordability percentage or affordability level. The local agency shall not require housing for mixed-income households to comply with any other aspect of the local affordable housing requirement.
(II)Notwithstanding subclause (I), the local affordable housing requirements shall not be applied to require housing for mixed-income households to dedicate more than 20 percent of the units to affordable units of any kind.
(III)Housing for mixed-income households that is required to dedicate 20 percent of the units to affordable units shall not be required to dedicate any of the affordable units at an income level deeper than lower income households, as defined in Section 50079.5 of the Health and Safety Code.
(IV)A local agency may only require housing for mixed-income households to comply with the local percentage requirement or affordability level described in subclause (I) if it first makes written findings, supported by a preponderance of evidence, that compliance with the local percentage requirement or the affordability level, or both, would not render the housing development project infeasible. If a reasonable person could find compliance with either requirement, either alone or in combination, would render the project infeasible, the project shall not be required to comply with that requirement.
(ii)Affordable units in the development project shall have a comparable bedroom and bathroom count as the market rate units.
(iii)Each affordable unit dedicated pursuant to this subparagraph shall count toward satisfying a local affordable housing requirement. Each affordable unit dedicated pursuant to a local affordable housing requirement that meets the criteria established in this subparagraph shall count towards satisfying the requirements of this subparagraph. This is declaratory of existing law.
(7)(A)For a housing development project application that is deemed complete before January 1, 2025, the development proponent for the project may choose to be subject to the provisions of this section that were in place on the date the preliminary application was submitted, or, if the project meets the definition of a builders remedy project, it may choose to be subject to any or all of the provisions of this section applicable as of January 1, 2025.
(B)Notwithstanding subdivision (c) of Section 65941.1, for a housing development project deemed complete before January 1, 2025, the development proponent may choose to revise their application so that the project is a builders remedy project, without being required to resubmit a preliminary application, even if the revision results in the number of residential units or square footage of construction changing by 20 percent or more.
(8)A housing development project proposed on a site that is identified as suitable or available for very low, low-, or moderate-income households in the jurisdictions housing element, that is consistent with the density specified in the most recently updated and adopted housing element, and that is inconsistent with both the jurisdictions zoning ordinance and general plan land use designation on the date the application was deemed complete, shall be subject to the provisions of subparagraphs (A), (B), and (D) of paragraph (6) and paragraph (9).
(9)For purposes of this subdivision, objective, quantifiable, written development standards, conditions, and policies means criteria that involve no personal or subjective judgment by a public official and are uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official before submittal, including, but not limited to, any standard, ordinance, or policy described in paragraph (4) of subdivision (o). Nothing herein shall affect the obligation of the housing development project to comply with the minimum building standards approved by the California Building Standards Commission as provided in Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code. In the event that applicable objective, quantifiable, written development standards, conditions, and policies are mutually inconsistent, a development shall be deemed consistent with the criteria that permits the density and unit type closest to that of the proposed project.
(g)This section shall be applicable to charter cities because the Legislature finds that the lack of housing, including emergency shelter, is a critical statewide problem.
(h)The following definitions apply for the purposes of this section:
(1)Feasible means capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social, and technological factors.
(2)Housing development project means a use consisting of any of the following:
(A)Residential units only.
(B)Mixed-use developments consisting of residential and nonresidential uses that meet any of the following conditions:
(i)At least two-thirds of the new or converted square footage is designated for residential use.
(ii)At least 50 percent of the new or converted square footage is designated for residential use and the project meets both of the following:
(I)The project includes at least 500 net new residential units.
(II)No portion of the project is designated for use as a hotel, motel, bed and breakfast inn, or other transient lodging, except a portion of the project may be designated for use as a residential hotel, as defined in Section 50519 of the Health and Safety Code.
(iii)At least 50 percent of the net new or converted square footage is designated for residential use and the project meets all of the following:
(I)The project includes at least 500 net new residential units.
(II)The project involves the demolition or conversion of at least 100,000 square feet of nonresidential use.
(III)The project demolishes at least 50 percent of the existing nonresidential uses on the site.
(IV)No portion of the project is designated for use as a hotel, motel, bed and breakfast inn, or other transient lodging, except a portion of the project may be designated for use as a residential hotel, as defined in Section 50519 of the Health and Safety Code.
(C)Transitional housing or supportive housing.
(D)Farmworker housing, as defined in subdivision (h) of Section 50199.7 of the Health and Safety Code.
(3)(A)Housing for very low, low-, or moderate-income households means housing for lower income households, mixed-income households, or moderate-income households.
(B)Housing for lower income households means a housing development project in which 100 percent of the units, excluding managers units, are dedicated to lower income households, as defined in Section 50079.5 of the Health and Safety Code, at an affordable cost, as defined by Section 50052.5 of the Health and Safety Code, or an affordable rent set in an amount consistent with the rent limits established by the California Tax Credit Allocation Committee. The units shall be subject to a recorded deed restriction for a period of 55 years for rental units and 45 years for owner-occupied units.
(C)(i)Housing for mixed-income households means any of the following:
(I)A housing development project in which at least 7 percent of the total units, as defined in subparagraph (A) of paragraph (8) of subdivision (o) of Section 65915, are dedicated to extremely low income households, as defined in Section 50106 of the Health and Safety Code.
(II)A housing development project in which at least 10 percent of the total units, as defined in subparagraph (A) of paragraph (8) of subdivision (o) of Section 65915, are dedicated to very low income households, as defined in Section 50105 of the Health and Safety Code.
(III)A housing development project in which at least 13 percent of the total units, as defined in subparagraph (A) of paragraph (8) of subdivision (o) of Section 65915, are dedicated to lower income households, as defined in Section 50079.5 of the Health and Safety Code.
(IV)A housing development project in which there are 10 or fewer total units, as defined in subparagraph (A) of paragraph (8) of subdivision (o) of Section 65915, that is on a site that is smaller than one acre, and that is proposed for development at a minimum density of 10 units per acre.
(ii)All units dedicated to extremely low income, very low income, and low-income households pursuant to clause (i) shall meet both of the following:
(I)The units shall have an affordable housing cost, as defined in Section 50052.5 of the Health and Safety Code, or an affordable rent, as defined in Section 50053 of the Health and Safety Code.
(II)The development proponent shall agree to, and the local agency shall ensure, the continued affordability of all affordable rental units included pursuant to this section for 55 years and all affordable ownership units included pursuant to this section for a period of 45 years.
(D)Housing for moderate-income households means a housing development project in which 100 percent of the units are sold or rented to moderate-income households, as defined in Section 50093 of the Health and Safety Code, at an affordable housing cost, as defined in Section 50052.5 of the Health and Safety Code, or an affordable rent, as defined in Section 50053 of the Health and Safety Code. The units shall be subject to a recorded deed restriction for a period of 55 years for rental units and 45 years for owner-occupied units.
(4)Area median income means area median income as periodically established by the Department of Housing and Community Development pursuant to Section 50093 of the Health and Safety Code.
(5)Notwithstanding any other law, until January 1, 2030, deemed complete means that the applicant has submitted a preliminary application pursuant to Section 65941.1 or, if the applicant has not submitted a preliminary application, has submitted a complete application pursuant to Section 65943. The local agency shall bear the burden of proof in establishing that the application is not complete.
(6)Disapprove the housing development project includes any instance in which a local agency does any of the following:
(A)Votes or takes final administrative action on a proposed housing development project application and the application is disapproved, including any required land use approvals or entitlements necessary for the issuance of a building permit.
(B)Fails to comply with the time periods specified in subdivision (a) of Section 65950. An extension of time pursuant to Article 5 (commencing with Section 65950) shall be deemed to be an extension of time pursuant to this paragraph.
(C)Fails to meet the time limits specified in comply with any provisions of Section 65913.3.
(D)Fails to cease a course of conduct undertaken for an improper purpose, such as to harass or to cause unnecessary delay or needless increases in the cost of the proposed housing development project, that effectively disapproves the proposed housing development without taking final administrative action if all of the following conditions are met:
(i)The project applicant provides written notice detailing the challenged conduct and why it constitutes disapproval to the local agency established under Section 65100.
(ii)Within five working days of receiving the applicants written notice described in clause (i), the local agency shall post the notice on the local agencys internet website, provide a copy of the notice to any person who has made a written request for notices pursuant to subdivision (f) of Section 21167 of the Public Resources Code, and file the notice with the county clerk of each county in which the project will be located. The county clerk shall post the notice and make it available for public inspection in the manner set forth in subdivision (c) of Section 21152 of the Public Resources Code.
(iii)The local agency shall consider all objections, comments, evidence, and concerns about the project or the applicants written notice and shall not make a determination until at least 60 days after the applicant has given written notice to the local agency pursuant to clause (i).
(iv)Within 90 days of receipt of the applicants written notice described in clause (i), the local agency shall issue a written statement that it will immediately cease the challenged conduct or issue written findings that comply with both of the following requirements:
(I)The findings articulate an objective basis for why the challenged course of conduct is necessary.
(II)The findings provide clear instructions on what the applicant must submit or supplement so that the local agency can make a final determination regarding the next necessary approval or set the date and time of the next hearing.
(v)(I)If a local agency continues the challenged course of conduct described in the applicants written notice and fails to issue the written findings described in clause (iv), the local agency shall bear the burden of establishing that its course of conduct does not constitute a disapproval of the housing development project under this subparagraph in an action taken by the applicant.
(II)If an applicant challenges a local agencys course of conduct as a disapproval under this subparagraph, the local agencys written findings described in clause (iv) shall be incorporated into the administrative record and be deemed to be the final administrative action for purposes of adjudicating whether the local agencys course of conduct constitutes a disapproval of the housing development project under this subparagraph.
(vi)A local agencys action in furtherance of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), including, but not limited to, imposing mitigating measures, shall not constitute project disapproval under this subparagraph.
(E)Fails to comply with Section 65905.5. For purposes of this subparagraph, a builders remedy project shall be deemed to comply with the applicable, objective general plan and zoning standards in effect at the time an application is deemed complete.
(F)(i)Determines that an application for a housing development project is incomplete pursuant to subdivision (a) or (b) of Section 65943 and includes in the determination an item that is not required on the local agencys submittal requirement checklist. The local agency shall bear the burden of proof that the required item is listed on the submittal requirement checklist.
(ii)In a subsequent review of an application pursuant to Section 65943, requests the applicant provide new information that was not identified in the initial determination and upholds this determination in the final written determination on an appeal filed pursuant to subdivision (c) of Section 65943. The local agency shall bear the burden of proof that the required item was identified in the initial determination.
(iii)Determines that an application for a housing development project is incomplete pursuant to subdivision (a) or (b) of Section 65943, a reasonable person would conclude that the applicant has submitted all of the items required on the local agencys submittal requirement checklist, and the local agency upholds this determination in the final written determination on an appeal filed pursuant to subdivision (c) of Section 65943.
(iv)If a local agency determines that an application is incomplete under Section 65943 after two resubmittals of the application by the applicant, the local agency shall bear the burden of establishing that the determination is not an effective disapproval of a housing development project under this section.
(G)Violates subparagraph (D) or (E) of paragraph (6) of subdivision (f).
(H)Makes a written determination that a preliminary application described in subdivision (a) of Section 65941.1 has expired or that the applicant has otherwise lost its vested rights under the preliminary application for any reason other than those described in subdivisions (c) and (d) of Section 65941.1.
(I)(i)Fails to make a determination of whether the project is exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), or commits an abuse of discretion, as defined in subdivision (b) of Section 65589.5.1 if all of the conditions in Section 65589.5.1 are satisfied.
(ii)This subparagraph shall become inoperative on January 1, 2031.
(J)(i)Fails to adopt a negative declaration or addendum for the project, to certify an environmental impact report for the project, or to approve another comparable environmental document, such as a sustainable communities environmental assessment pursuant to Section 21155.2 of the Public Resources Code, as required pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), if all of the conditions in Section 65589.5.2 are satisfied.
(ii)This subparagraph shall become inoperative on January 1, 2031.
(7)(A)For purposes of this section and Sections 65589.5.1 and 65589.5.2, lawful determination means any final decision about whether to approve or disapprove a statutory or categorical exemption or a negative declaration, addendum, environmental impact report, or comparable environmental review document under the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) that is not an abuse of discretion, as defined in subdivision (b) of Section 65589.5.1 or subdivision (b) of Section 65589.5.2.
(B)This paragraph shall become inoperative on January 1, 2031.
(8)Lower density includes any conditions that have the same effect or impact on the ability of the project to provide housing.
(9)Until January 1, 2030, objective means involving no personal or subjective judgment by a public official and being uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official.
(10)Notwithstanding any other law, until January 1, 2030, determined to be complete means that the applicant has submitted a complete application pursuant to Section 65943.
(11)Builders remedy project means a project that meets all of the following criteria:
(A)The project is a housing development project that provides housing for very low, low-, or moderate-income households.
(B)On or after the date an application for the housing development project or emergency shelter was deemed complete, the jurisdiction did not have a housing element that was in substantial compliance with this article.
(C)The project has a density such that the number of units, as calculated before the application of a density bonus pursuant to Section 65915, complies with all of the following conditions:
(i)The density does not exceed the greatest of the following densities:
(I)Fifty percent greater than the minimum density deemed appropriate to accommodate housing for that jurisdiction as specified in subparagraph (B) of paragraph (3) of subdivision (c) of Section 65583.2.
(II)Three times the density allowed by the general plan, zoning ordinance, or state law, whichever is greater.
(III)The density that is consistent with the density specified in the housing element.
(ii)Notwithstanding clause (i), the greatest allowable density shall be 35 units per acre more than the amount allowable pursuant to clause (i), if any portion of the site is located within any of the following:
(I)One-half mile of a major transit stop, as defined in Section 21064.3 of the Public Resources Code.
(II)A very low vehicle travel area, as defined in subdivision (h).
(III)A high or highest resource census tract, as identified by the latest edition of the CTCAC/HCD Opportunity Map published by the California Tax Credit Allocation Committee and the Department of Housing and Community Development.
(D)(i)On sites that have a minimum density requirement and are located within one-half mile of a commuter rail station or a heavy rail station, the density of the project shall not be less than the minimum density required on the site.
(I)For purposes of this subparagraph, commuter rail means a railway that is not a light rail, streetcar, trolley, or tramway and that is for urban passenger train service consisting of local short distance travel operating between a central city and adjacent suburb with service operated on a regular basis by or under contract with a transit operator for the purpose of transporting passengers within urbanized areas, or between urbanized areas and outlying areas, using either locomotive-hauled or self-propelled railroad passenger cars, with multitrip tickets and specific station-to-station fares.
(II)For purposes of this subparagraph, heavy rail means an electric railway with the capacity for a heavy volume of traffic using high speed and rapid acceleration passenger rail cars operating singly or in multicar trains on fixed rails, separate rights-of-way from which all other vehicular and foot traffic are excluded, and high platform loading.
(ii)On all other sites with a minimum density requirement, the density of the project shall not be less than the local agencys minimum density or one-half of the minimum density deemed appropriate to accommodate housing for that jurisdiction as specified in subparagraph (B) of paragraph (3) of subdivision (c) of Section 65583.2, whichever is lower.
(E)The project site does not abut a site where more than one-third of the square footage on the site has been used, within the past three years, by a heavy industrial use, or a Title V industrial use, as those terms are defined in Section 65913.16.
(12)Condition approval includes imposing on the housing development project, or attempting to subject it to, development standards, conditions, or policies.
(13)Unit type means the form of ownership and the kind of residential unit, including, but not limited to, single-family detached, single-family attached, for-sale, rental, multifamily, townhouse, condominium, apartment, manufactured homes and mobilehomes, factory-built housing, and residential hotel.
(14)Proposed by the applicant means the plans and designs as submitted by the applicant, including, but not limited to, density, unit size, unit type, site plan, building massing, floor area ratio, amenity areas, open space, parking, and ancillary commercial uses.
(i)If any city, county, or city and county denies approval or imposes conditions, including design changes, lower density, or a reduction of the percentage of a lot that may be occupied by a building or structure under the applicable planning and zoning in force at the time the housing development projects application is complete, that have a substantial adverse effect on the viability or affordability of a housing development for very low, low-, or moderate-income households, and the denial of the development or the imposition of conditions on the development is the subject of a court action which challenges the denial or the imposition of conditions, then the burden of proof shall be on the local legislative body to show that its decision is consistent with the findings as described in subdivision (d), and that the findings are supported by a preponderance of the evidence in the record, and with the requirements of subdivision (o).
(j)(1)When a proposed housing development project complies with applicable, objective general plan, zoning, and subdivision standards and criteria, including design review standards, in effect at the time that the application was deemed complete, but the local agency proposes to disapprove the project or to impose a condition that the project be developed at a lower density, the local agency shall base its decision regarding the proposed housing development project upon written findings supported by a preponderance of the evidence on the record that both of the following conditions exist:
(A)The housing development project would have a specific, adverse impact upon the public health or safety unless the project is disapproved or approved upon the condition that the project be developed at a lower density. As used in this paragraph, a specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(B)There is no feasible method to satisfactorily mitigate or avoid the adverse impact identified pursuant to paragraph (1), other than the disapproval of the housing development project or the approval of the project upon the condition that it be developed at a lower density.
(2)(A)If the local agency considers a proposed housing development project to be inconsistent, not in compliance, or not in conformity with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision as specified in this subdivision, it shall provide the applicant with written documentation identifying the provision or provisions, and an explanation of the reason or reasons it considers the housing development to be inconsistent, not in compliance, or not in conformity as follows:
(i)Within 30 days of the date that the application for the housing development project is determined to be complete, if the housing development project contains 150 or fewer housing units.
(ii)Within 60 days of the date that the application for the housing development project is determined to be complete, if the housing development project contains more than 150 units.
(B)If the local agency fails to provide the required documentation pursuant to subparagraph (A), the housing development project shall be deemed consistent, compliant, and in conformity with the applicable plan, program, policy, ordinance, standard, requirement, or other similar provision.
(3)For purposes of this section, the receipt of a density bonus, incentive, concession, waiver, or reduction of development standards pursuant to Section 65915 shall not constitute a valid basis on which to find a proposed housing development project is inconsistent, not in compliance, or not in conformity, with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision specified in this subdivision.
(4)For purposes of this section, a proposed housing development project is not inconsistent with the applicable zoning standards and criteria, and shall not require a rezoning, if the housing development project is consistent with the objective general plan standards and criteria but the zoning for the project site is inconsistent with the general plan. If the local agency has complied with paragraph (2), the local agency may require the proposed housing development project to comply with the objective standards and criteria of the zoning which is consistent with the general plan, however, the standards and criteria shall be applied to facilitate and accommodate development at the density allowed on the site by the general plan and proposed by the proposed housing development project.
(k)(1)(A)(i)The applicant, a person who would be eligible to apply for residency in the housing development project or emergency shelter, or a housing organization may bring an action to enforce this section. If, in any action brought to enforce this section, a court finds that any of the following are met, the court shall issue an order pursuant to clause (ii):
(I)The local agency, in violation of subdivision (d), disapproved a housing development project or conditioned its approval in a manner rendering it infeasible for the development of an emergency shelter, or housing for very low, low-, or moderate-income households, including farmworker housing, without making the findings required by this section.
(II)The local agency, in violation of subdivision (j), disapproved a housing development project complying with applicable, objective general plan and zoning standards and criteria, or imposed a condition that the project be developed at a lower density, without making the findings required by this section.
(III)(ia)Subject to sub-subclause (ib), the local agency, in violation of subdivision (o), required or attempted to require a housing development project to comply with an ordinance, policy, or standard not adopted and in effect when a preliminary application was submitted.
(ib)This subclause shall become inoperative on January 1, 2030.
(IV)The local agency violated a provision of this section applicable to a builders remedy project.
(ii)If the court finds that one of the conditions in clause (i) is met, the court shall issue an order or judgment compelling compliance with this section within a time period not to exceed 60 days, including, but not limited to, an order that the local agency take action on the housing development project or emergency shelter. The court may issue an order or judgment directing the local agency to approve the housing development project or emergency shelter if the court finds that the local agency acted in bad faith when it disapproved or conditionally approved the housing development or emergency shelter in violation of this section. The court shall retain jurisdiction to ensure that its order or judgment is carried out and shall award reasonable attorneys fees and costs of suit to the plaintiff or petitioner, provided, however, that the court shall not award attorneys fees in either of the following instances:
(I)The court finds, under extraordinary circumstances, that awarding fees would not further the purposes of this section.
(II)(ia)In a case concerning a disapproval within the meaning of subparagraph (I) or (J) of paragraph (6) of subdivision (h), the court finds that the local agency acted in good faith and had reasonable cause to disapprove the housing development project due to the existence of a controlling question of law about the application of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) or implementing guidelines as to which there was a substantial ground for difference of opinion at the time of the disapproval.
(ib)This subclause shall become inoperative on January 1, 2031.
(B)Upon a determination that the local agency has failed to comply with the order or judgment compelling compliance with this section within the time period prescribed by the court, the court shall impose fines on a local agency that has violated this section and require the local agency to deposit any fine levied pursuant to this subdivision into a local housing trust fund. The local agency may elect to instead deposit the fine into the Building Homes and Jobs Trust Fund. The fine shall be in a minimum amount of ten thousand dollars ($10,000) per housing unit in the housing development project on the date the application was deemed complete pursuant to Section 65943. In determining the amount of the fine to impose, the court shall consider the local agencys progress in attaining its target allocation of the regional housing need pursuant to Section 65584 and any prior violations of this section. Fines shall not be paid out of funds already dedicated to affordable housing, including, but not limited to, Low and Moderate Income Housing Asset Funds, funds dedicated to housing for very low, low-, and moderate-income households, and federal HOME Investment Partnerships Program and Community Development Block Grant Program funds. The local agency shall commit and expend the money in the local housing trust fund within five years for the sole purpose of financing newly constructed housing units affordable to extremely low, very low, or low-income households. After five years, if the funds have not been expended, the money shall revert to the state and be deposited in the Building Homes and Jobs Trust Fund for the sole purpose of financing newly constructed housing units affordable to extremely low, very low, or low-income households.
(C)If the court determines that its order or judgment has not been carried out within 60 days, the court may issue further orders as provided by law to ensure that the purposes and policies of this section are fulfilled, including, but not limited to, an order to vacate the decision of the local agency and to approve the housing development project, in which case the application for the housing development project, as proposed by the applicant at the time the local agency took the initial action determined to be in violation of this section, along with any standard conditions determined by the court to be generally imposed by the local agency on similar projects, shall be deemed to be approved unless the applicant consents to a different decision or action by the local agency.
(D)Nothing in this section shall limit the courts inherent authority to make any other orders to compel the immediate enforcement of any writ brought under this section, including the imposition of fees and other sanctions set forth under Section 1097 of the Code of Civil Procedure.
(2)For purposes of this subdivision, housing organization means a trade or industry group whose local members are primarily engaged in the construction or management of housing units or a nonprofit organization whose mission includes providing or advocating for increased access to housing for low-income households and have filed written or oral comments with the local agency prior to action on the housing development project. A housing organization may only file an action pursuant to this section to challenge the disapproval of a housing development by a local agency. A housing organization shall be entitled to reasonable attorneys fees and costs if it is the prevailing party in an action to enforce this section.
(l)If the court finds that the local agency (1) acted in bad faith when it violated this section and (2) failed to carry out the courts order or judgment within the time period prescribed by the court, the court, in addition to any other remedies provided by this section, shall multiply the fine determined pursuant to subparagraph (B) of paragraph (1) of subdivision (k) by a factor of five. If a court has previously found that the local agency violated this section within the same planning period, the court shall multiply the fines by an additional factor for each previous violation. For purposes of this section, bad faith includes, but is not limited to, an action or inaction that is frivolous, pretextual, intended to cause unnecessary delay, or entirely without merit.
(m)(1)Any action brought to enforce the provisions of this section shall be brought pursuant to Section 1094.5 of the Code of Civil Procedure, and the local agency shall prepare and certify the record of proceedings in accordance with subdivision (c) of Section 1094.6 of the Code of Civil Procedure no later than 30 days after the petition is served, provided that the cost of preparation of the record shall be borne by the local agency, unless the petitioner elects to prepare the record as provided in subdivision (n) of this section. A petition to enforce the provisions of this section shall be filed and served no later than 90 days from the later of (1) the effective date of a decision of the local agency imposing conditions on, disapproving, or any other final action on a housing development project or (2) the expiration of the time periods specified in subparagraph (B) of paragraph (5) of subdivision (h). Upon entry of the trial courts order, a party may, in order to obtain appellate review of the order, file a petition within 20 days after service upon it of a written notice of the entry of the order, or within such further time not exceeding an additional 20 days as the trial court may for good cause allow, or may appeal the judgment or order of the trial court under Section 904.1 of the Code of Civil Procedure. If the local agency appeals the judgment of the trial court, the local agency shall post a bond, in an amount to be determined by the court, to the benefit of the plaintiff if the plaintiff is the project applicant.
(2)(A)A disapproval within the meaning of subparagraph (I) of paragraph (6) of subdivision (h) shall be final for purposes of this subdivision, if the local agency did not make a lawful determination within the time period set forth in paragraph (5) of subdivision (a) of Section 65589.5.1 after the applicants timely written notice.
(B)This paragraph shall become inoperative on January 1, 2031.
(3)(A)A disapproval within the meaning of subparagraph (J) of paragraph (6) of subdivision (h) shall be final for purposes of this subdivision, if the local agency did not make a lawful determination within 90 days of the applicants timely written notice.
(B)This paragraph shall become inoperative on January 1, 2031.
(n)In any action, the record of the proceedings before the local agency shall be filed as expeditiously as possible and, notwithstanding Section 1094.6 of the Code of Civil Procedure or subdivision (m) of this section, all or part of the record may be prepared (1) by the petitioner with the petition or petitioners points and authorities, (2) by the respondent with respondents points and authorities, (3) after payment of costs by the petitioner, or (4) as otherwise directed by the court. If the expense of preparing the record has been borne by the petitioner and the petitioner is the prevailing party, the expense shall be taxable as costs.
(o)(1)Subject to paragraphs (2), (6), and (7), and subdivision (d) of Section 65941.1, a housing development project shall be subject only to the ordinances, policies, and standards adopted and in effect when a preliminary application including all of the information required by subdivision (a) of Section 65941.1 was submitted.
(2)Paragraph (1) shall not prohibit a housing development project from being subject to ordinances, policies, and standards adopted after the preliminary application was submitted pursuant to Section 65941.1 in the following circumstances:
(A)In the case of a fee, charge, or other monetary exaction, to an increase resulting from an automatic annual adjustment based on an independently published cost index that is referenced in the ordinance or resolution establishing the fee or other monetary exaction.
(B)A preponderance of the evidence in the record establishes that subjecting the housing development project to an ordinance, policy, or standard beyond those in effect when a preliminary application was submitted is necessary to mitigate or avoid a specific, adverse impact upon the public health or safety, as defined in subparagraph (A) of paragraph (1) of subdivision (j), and there is no feasible alternative method to satisfactorily mitigate or avoid the adverse impact.
(C)Subjecting the housing development project to an ordinance, policy, standard, or any other measure, beyond those in effect when a preliminary application was submitted is necessary to avoid or substantially lessen an impact of the project under the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(D)The housing development project has not commenced construction within two and one-half years, or three and one-half years for an affordable housing project, following the date that the project received final approval. For purposes of this subparagraph:
(i)Affordable housing project means a housing development that satisfies both of the following requirements:
(I)Units within the development are subject to a recorded affordability restriction for at least 55 years for rental housing and 45 years for owner-occupied housing, or the first purchaser of each unit participates in an equity sharing agreement as described in subparagraph (C) of paragraph (2) of subdivision (c) of Section 65915.
(II)All of the units within the development, excluding managers units, are dedicated to lower income households, as defined by Section 50079.5 of the Health and Safety Code.
(ii)Final approval means that the housing development project has received all necessary approvals to be eligible to apply for, and obtain, a building permit or permits and either of the following is met:
(I)The expiration of all applicable appeal periods, petition periods, reconsideration periods, or statute of limitations for challenging that final approval without an appeal, petition, request for reconsideration, or legal challenge having been filed.
(II)If a challenge is filed, that challenge is fully resolved or settled in favor of the housing development project.
(E)The housing development project is revised following submittal of a preliminary application pursuant to Section 65941.1 such that the number of residential units or square footage of construction changes by 20 percent or more, exclusive of any increase resulting from the receipt of a density bonus, incentive, concession, waiver, or similar provision, including any other locally authorized program that offers additional density or other development bonuses when affordable housing is provided. For purposes of this subdivision, square footage of construction means the building area, as defined by the California Building Standards Code (Title 24 of the California Code of Regulations).
(3)This subdivision does not prevent a local agency from subjecting the additional units or square footage of construction that result from project revisions occurring after a preliminary application is submitted pursuant to Section 65941.1 to the ordinances, policies, and standards adopted and in effect when the preliminary application was submitted.
(4)For purposes of this subdivision, ordinances, policies, and standards includes general plan, community plan, specific plan, zoning, design review standards and criteria, subdivision standards and criteria, and any other rules, regulations, requirements, and policies of a local agency, as defined in Section 66000, including those relating to development impact fees, capacity or connection fees or charges, permit or processing fees, and other exactions.
(5)This subdivision shall not be construed in a manner that would lessen the restrictions imposed on a local agency, or lessen the protections afforded to a housing development project, that are established by any other law, including any other part of this section.
(6)This subdivision shall not restrict the authority of a public agency or local agency to require mitigation measures to lessen the impacts of a housing development project under the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(7)With respect to completed residential units for which the project approval process is complete and a certificate of occupancy has been issued, nothing in this subdivision shall limit the application of later enacted ordinances, policies, and standards that regulate the use and occupancy of those residential units, such as ordinances relating to rental housing inspection, rent stabilization, restrictions on short-term renting, and business licensing requirements for owners of rental housing.
(8)(A)This subdivision shall apply to a housing development project that submits a preliminary application pursuant to Section 65941.1 before January 1, 2030.
(B)This subdivision shall become inoperative on January 1, 2034.
(p)(1)Upon any motion for an award of attorneys fees pursuant to Section 1021.5 of the Code of Civil Procedure, in a case challenging a local agencys approval of a housing development project, a court, in weighing whether a significant benefit has been conferred on the general public or a large class of persons and whether the necessity of private enforcement makes the award appropriate, shall give due weight to the degree to which the local agencys approval furthers policies of this section, including, but not limited to, subdivisions (a), (b), and (c), the suitability of the site for a housing development, and the reasonableness of the decision of the local agency. It is the intent of the Legislature that attorneys fees and costs shall rarely, if ever, be awarded if a local agency, acting in good faith, approved a housing development project that satisfies conditions established in paragraph (1), (2), or (3) of subdivision (a) of Section 65589.5.1 or paragraph (1), (2), or (3) of subdivision (a) of Section 65589.5.2.
(2)This subdivision shall become inoperative on January 1, 2031.
(q)This section shall be known, and may be cited, as the Housing Accountability Act.
(r)The provisions of this section are severable. If any provision of this section or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
SECTION 1.SEC. 2.Section 65913.3 of the Government Code is amended to read:65913.3.(a)(1)A local agency shall compile one or more lists that shall specify in detail the information that will be required from any applicant for a postentitlement phase permit. The local agency may revise the lists of information required from an applicant. Any revised list shall not apply to any permit pending review.
(2)A local agency shall post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least five types of housing development projects in the jurisdiction, including, but not limited to, accessory dwelling unit, duplex, multifamily, mixed use, and townhome.
(3)A local agency shall make the items required by paragraphs (1) and (2) available on the agencys internet website no later than January 1, 2024.
(b)(1)(A)A local agency shall determine whether an application for a postentitlement phase permit is complete and provide written notice of this determination to the applicant not later than 15 business days after the local agency received the application.
(B)If the local agency determines an application is incomplete, the local agency shall provide the applicant with a list of incomplete items and a description of how the application can be made complete. The list shall be limited to incomplete items that are included on the lists required by paragraph (1) of subdivision (a). The list and description shall be provided with the written notice required by subparagraph (A).
(2)(A)After receiving a notice that the application was incomplete, an applicant may cure and address the items that are deemed to be incomplete by the local agency.
(B)In the review of an application submitted pursuant to subparagraph (A), the local agency shall not require the application to include an item that was not included in the list required by subparagraph (B) of paragraph (1).
(C)If an applicant submits an application pursuant to subparagraph (A), the local agency shall determine whether the additional application has remedied all incomplete items listed in the determination issued pursuant to subparagraph (B) of paragraph (1). This additional application is subject to the timelines and requirements specified in subparagraph (A) of paragraph (1).
(3)If a local agency does not make a timely determination as required by paragraph (1) or (2) and the application or resubmitted application states that it is for a postentitlement phase permit, the application or resubmitted application shall be deemed to be complete for the purposes of this chapter.
(c)(1)(A)For housing development projects with 25 units or fewer, a local agency shall complete the review and do either of the following:
(i)If the local agency determines that the complete application is not compliant with the permit standards, return in writing a full set of comments to the applicant with a comprehensive request for revisions.
(ii)If the local agency determines that the complete application is compliant with the permit standards, return the approved permit application on each postentitlement phase permit requested.
(B)The local agency shall immediately transmit that determination to the applicant by electronic mail and, if applicable, by posting the response on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 not later than 30 business days after the local agency determines that an application for a postentitlement phase permit is complete pursuant to subdivision (b).
(C)As part of its review, the local agency shall not require or request more than two plan check and specification reviews in connection with an application for a building permit, unless the local agencys requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety.
(2)(A)For housing development projects with 26 units or more, a local agency shall complete the review and do either of the following:
(i)If the local agency determines that the complete application is not compliant with the permit standards, return in writing a full set of comments to the applicant with a comprehensive request for revisions.
(ii)If the local agency determines that the complete application is compliant with the permit standards, return the approved permit application on each postentitlement phase permit requested.
(B)The local agency shall immediately transmit that determination to the applicant by electronic mail and, if applicable, by posting the response on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 not later than 60 business days after the local agency determines that an application for a postentitlement phase permit is complete pursuant to subdivision (b).
(C)As part of its review, the local agency shall not require or request more than two plan check and specification reviews in connection with an application for a building permit, unless the local agencys requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety.
(3)Once a local agency determines that a postentitlement permit is compliant with applicable permit standards pursuant to paragraph (1) or (2), the local agency shall not subject the postentitlement phase permit to any appeals or additional hearing requirements.
(4)The time limits in this subdivision shall not apply if the local agency makes written findings within the time limits specified in paragraph (1) or (2) based on substantial evidence in the record that the proposed postentitlement phase permit might have a specific, adverse impact on public health or safety and that additional time is necessary to process the application.
(d)(1)If a local agency finds that a complete application is noncompliant, the local agency shall provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within the time limits specified in subdivision (c).
(2)The local agency shall provide the list and description authorized by paragraph (1) when it transmits its determination to the applicant as required by subdivision (c).
(3)If a local agency denies a postentitlement phase permit application based on a determination that the application is noncompliant, the applicant may attempt to remedy the application.
(4)If an applicant submits an application pursuant to paragraph (3), the additional application is subject to the timelines of a new application as specified in subdivision (c).
(5)The local agency shall not request or require any action or inaction as a result of a building inspection undertaken to assess compliance with the applicable building permit standards that would represent a deviation from a previously approved building plan or similar approval for the building permit, unless the local agencys requirement or request is accompanied by written findings based on substantial evidence in the record that both of the following apply:
(A)A reasonable person could not interpret the previously approved building plan or similar approval as being compliant with the applicable standards for the building permit.
(B)The deviation is necessary to address a specific, adverse impact on public health or safety.
(e)(1)If a postentitlement phase permit is determined to be incomplete under subdivision (b) or denied or determined to be noncompliant under subdivision (c) or (d), the local agency shall provide a process for the applicant to appeal that decision in writing to the governing body of the agency or, if there is no governing body, to the director of the agency, as provided by that agency.
(2)(A)With respect to a postentitlement phase permit concerning housing development projects with 25 units or fewer, a local agency on the appeal shall provide a final written determination by not later than 30 business days after receipt of the applicants written appeal.
(B)With respect to a postentitlement phase permit concerning housing development projects with 26 units or more, a local agency on the appeal shall provide a final written determination by not later than 45 business days after receipt of the applicants written appeal.
(3)If the applicants appeal pursuant to this subdivision is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required, the applicant may seek a writ of mandate to compel approval of the application. The writ of mandate shall be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
(f)If a local agency violates this section, it shall be in violation of Section 65589.5.
(g)Except as provided in subparagraph (D) of paragraph (1) of, and subparagraph (D) of paragraph (2) of, subdivision (c), this section does not place limitations on the amount of feedback that a local agency may provide or revisions that a local agency may request of an applicant.
(h)For residential or residential mixed-use developments that are subject to the requirements set forth in Section 65913.4, the provisions of paragraph (2) of subdivision (h) of Section 65913.4 shall apply. Permits for these developments that are subject to paragraph (2) of subdivision (h) of Section 65913.4 shall not be in conflict with the requirements of this section. The local agency shall comply with both sets of standards.
(i)This section does not preclude an applicant and a local agency from mutually agreeing to an extension of any time limit provided by this section. However, a local agency shall not require an agreement as a condition of accepting the application for, or processing of, a postentitlement phase permit, unless the agreement is obtained for the purpose of permitting concurrent processing of related approvals or an environmental review on the same housing development project.
(j)For purposes of this section, the following definitions apply:
(1)Housing development project has the same meaning as in paragraph (3) of subdivision (b) of Section 65905.5.
(2)Local agency means any county, city, or city and county.
(3)(A)Postentitlement phase permit includes both of the following:
(i)All nondiscretionary permits and reviews that are required or issued by the local agency after the entitlement process has been completed to begin construction of a development that is intended to be at least two-thirds residential, excluding discretionary and ministerial planning permits, entitlements, and other permits and reviews that are covered under Chapter 4.5 (commencing with Section 65920). A postentitlement phase permit includes, but is not limited to, all of the following:
(I)Building permits, and all interdepartmental review required for the issuance of a building permit, including plan checking and building inspection.
(II)Permits for minor or standard off-site improvements.
(III)Permits for demolition.
(IV)Permits for minor or standard excavation and grading.
(ii)All building permits and other permits issued under the California Building Standards Code (Title 24 of the California Code of Regulations) or any applicable local building code for the construction, demolition, or alteration of buildings, whether discretionary or nondiscretionary.
(B)A local agency may identify by ordinance a threshold for determining whether a permit constitutes a minor or standard permit for the purposes of this paragraph, which shall be supported by written findings adopted by the jurisdiction.
(C)A postentitlement phase permit does not include a permit required and issued by the California Coastal Commission, a special district, a utility that is not owned and operated by a local agency, or any other entity that is not a city, county, or city and county.
(4)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
SEC. 2.SEC. 3.The amendments of paragraph (5) of subdivision (d) of, and subclause (I) of clause (i) of subparagraph (A) of paragraph (3) of subdivision (j) of, Section 65913.3 of the Government Code made by this act do not constitute a change in, but are declaratory of, existing law.
SEC. 3.SEC. 4.The Legislature finds and declares that Section 1 2 of this act amending Section 65913.3 of the Government Code addresses a matter of statewide concern rather than a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 1 2 of this act applies to all cities, including charter cities.
SEC. 4.SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)(1)A local agency shall compile one or more lists that shall specify in detail the information that will be required from any applicant for a postentitlement phase permit. The local agency may revise the lists of information required from an applicant. Any revised list shall not apply to any permit pending review.
(2)A local agency shall post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least five types of housing development projects in the jurisdiction, including, but not limited to, accessory dwelling unit, duplex, multifamily, mixed use, and townhome.
(3)A local agency shall make the items required by paragraphs (1) and (2) available on the agencys internet website no later than January 1, 2024.
(b)(1)(A)A local agency shall determine whether an application for a postentitlement phase permit is complete and provide written notice of this determination to the applicant not later than 15 business days after the local agency received the application.
(B)If the local agency determines an application is incomplete, the local agency shall provide the applicant with a list of incomplete items and a description of how the application can be made complete. The list shall be limited to incomplete items that are included on the lists required by paragraph (1) of subdivision (a). The list and description shall be provided with the written notice required by subparagraph (A).
(2)(A)After receiving a notice that the application was incomplete, an applicant may cure and address the items that are deemed to be incomplete by the local agency.
(B)In the review of an application submitted pursuant to subparagraph (A), the local agency shall not require the application to include an item that was not included in the list required by subparagraph (B) of paragraph (1).
(C)If an applicant submits an application pursuant to subparagraph (A), the local agency shall determine whether the additional application has remedied all incomplete items listed in the determination issued pursuant to subparagraph (B) of paragraph (1). This additional application is subject to the timelines and requirements specified in subparagraph (A) of paragraph (1).
(3)If a local agency does not make a timely determination as required by paragraph (1) or (2) and the application or resubmitted application states that it is for a postentitlement phase permit, the application or resubmitted application shall be deemed to be complete for the purposes of this chapter.
(c)(1)(A)For housing development projects with 25 units or fewer, a local agency shall complete the review and do either of the following:
(i)If the local agency determines that the complete application is not compliant with the permit standards, return in writing a full set of comments to the applicant with a comprehensive request for revisions.
(ii)If the local agency determines that the complete application is compliant with the permit standards, return the approved permit application on each postentitlement phase permit requested.
(B)The local agency shall immediately transmit that determination to the applicant by electronic mail and, if applicable, by posting the response on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 not later than 30 business days after the local agency determines that an application for a postentitlement phase permit is complete pursuant to subdivision (b).
(C)As part of its review, the local agency shall not require or request more than two plan check and specification reviews in connection with an application for a building permit, unless the local agencys requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety.
(2)(A)For housing development projects with 26 units or more, a local agency shall complete the review and do either of the following:
(i)If the local agency determines that the complete application is not compliant with the permit standards, return in writing a full set of comments to the applicant with a comprehensive request for revisions.
(ii)If the local agency determines that the complete application is compliant with the permit standards, return the approved permit application on each postentitlement phase permit requested.
(B)The local agency shall immediately transmit that determination to the applicant by electronic mail and, if applicable, by posting the response on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 not later than 60 business days after the local agency determines that an application for a postentitlement phase permit is complete pursuant to subdivision (b).
(C)As part of its review, the local agency shall not require or request more than two plan check and specification reviews in connection with an application for a building permit, unless the local agencys requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety.
(3)Once a local agency determines that a postentitlement permit is compliant with applicable permit standards pursuant to paragraph (1) or (2), the local agency shall not subject the postentitlement phase permit to any appeals or additional hearing requirements.
(4)The time limits in this subdivision shall not apply if the local agency makes written findings within the time limits specified in paragraph (1) or (2) based on substantial evidence in the record that the proposed postentitlement phase permit might have a specific, adverse impact on public health or safety and that additional time is necessary to process the application.
(d)(1)If a local agency finds that a complete application is noncompliant, the local agency shall provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within the time limits specified in subdivision (c).
(2)The local agency shall provide the list and description authorized by paragraph (1) when it transmits its determination to the applicant as required by subdivision (c).
(3)If a local agency denies a postentitlement phase permit application based on a determination that the application is noncompliant, the applicant may attempt to remedy the application.
(4)If an applicant submits an application pursuant to paragraph (3), the additional application is subject to the timelines of a new application as specified in subdivision (c).
(5)The local agency shall not request or require any action or inaction as a result of a site building inspection undertaken to assess compliance with the applicable building permit standards that would represent a deviation from a previously approved building plan or similar approval for the project, building permit, unless the local agencys requirement or request is accompanied by written findings based on substantial evidence in the record that both of the following apply:
(A)A reasonable person could not interpret the previously approved building plan or similar approval as being compliant with the applicable standards. standards for the building permit.
(B)The deviation is necessary to address a specific, adverse impact on public health or safety.
(e)(1)If a postentitlement phase permit is determined to be incomplete under subdivision (b) or denied or determined to be noncompliant under subdivision (c) or (d), the local agency shall provide a process for the applicant to appeal that decision in writing to the governing body of the agency or, if there is no governing body, to the director of the agency, as provided by that agency.
(2)(A)With respect to a postentitlement phase permit concerning housing development projects with 25 units or fewer, a local agency on the appeal shall provide a final written determination by not later than 30 business days after receipt of the applicants written appeal.
(B)With respect to a postentitlement phase permit concerning housing development projects with 26 units or more, a local agency on the appeal shall provide a final written determination by not later than 45 business days after receipt of the applicants written appeal.
(3)If the applicants appeal pursuant to this subdivision is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required, the applicant may seek a writ of mandate to compel approval of the application. The writ of mandate shall be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
(f)If a local agency violates this section, it shall be in violation of Section 65589.5.
(g)Except as provided in subparagraph (D) of paragraph (1) of, and subparagraph (D) of paragraph (2) of, subdivision (c), this section does not place limitations on the amount of feedback that a local agency may provide or revisions that a local agency may request of an applicant.
(h)For residential or residential mixed-use developments that are subject to the requirements set forth in Section 65913.4, the provisions of paragraph (2) of subdivision (h) of Section 65913.4 shall apply. Permits for these developments that are subject to paragraph (2) of subdivision (h) of Section 65913.4 shall not be in conflict with the requirements of this section. The local agency shall comply with both sets of standards.
(i)This section does not preclude an applicant and a local agency from mutually agreeing to an extension of any time limit provided by this section. However, a local agency shall not require an agreement as a condition of accepting the application for, or processing of, a postentitlement phase permit, unless the agreement is obtained for the purpose of permitting concurrent processing of related approvals or an environmental review on the same housing development project.
(j)For purposes of this section, the following definitions apply:
(1)Housing development project has the same meaning as in paragraph (3) of subdivision (b) of Section 65905.5.
(2)Local agency means any county, city, or city and county.
(3)(A)Postentitlement phase permit includes both of the following:
(i)All nondiscretionary permits and reviews that are required or issued by the local agency after the entitlement process has been completed to begin construction of a development that is intended to be at least two-thirds residential, excluding discretionary and ministerial planning permits, entitlements, and other permits and reviews that are covered under Chapter 4.5 (commencing with Section 65920). A postentitlement phase permit includes, but is not limited to, all of the following:
(I)Building permits, and all interdepartmental review required for the issuance of a building permit, including plan checking and site building inspection.
(II)Permits for minor or standard off-site improvements.
(III)Permits for demolition.
(IV)Permits for minor or standard excavation and grading.
(ii)All building permits and other permits issued under the California Building Standards Code (Title 24 of the California Code of Regulations) or any applicable local building code for the construction, demolition, or alteration of buildings, whether discretionary or nondiscretionary.
(B)A local agency may identify by ordinance a threshold for determining whether a permit constitutes a minor or standard permit for the purposes of this paragraph, which shall be supported by written findings adopted by the jurisdiction.
(C)A postentitlement phase permit does not include a permit required and issued by the California Coastal Commission, a special district, a utility that is not owned and operated by a local agency, or any other entity that is not a city, county, or city and county.
(4)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
SEC. 2.Section 65913.3.1 of the Government Code is amended to read:65913.3.1.(a)This section applies to both of the following:(1)An application from a housing development project for service from a special district.(2)An application from a housing development project for a postentitlement phase permit that a local agency deemed complete pursuant to subdivision (b) of Section 65913.3 that requires separate approval from a special district.(b)A special district that receives an application pursuant to subdivision (a) shall provide written notice to the applicant, pursuant to the timelines specified in subdivision (c), of, the next steps in the review process, including, but not limited to, any additional information that may be required to begin to review the application for service or approval.(c)(1)For a housing development with 25 units or fewer, a special district shall provide the written notice required by subdivision (b) within 30 business days of receipt of the application.(2)For a housing development with 26 units or more, a special district shall provide the written notice required by subdivision (b) within 60 business days of receipt of the application.(d)(1)After receiving notice that an application requires additional information pursuant to subdivision (b), an applicant may provide the requested information directly to the special district.(2)A special district that receives additional information pursuant to paragraph (1) shall respond to the applicant with a notice that contains the information or next steps required by subdivision (b) in the applicable time period described by subdivision (c).(3)A special district shall continue to review each submission by an applicant to determine additional relevant information and provide written notice of the next steps or additional information required in the applicable time periods described in subdivision (c) of each submission by the applicant.(4)(A)Following receipt of a notice pursuant to paragraph (2), the applicant may provide a written response to the special district notifying the special district that the applicant believes that it has submitted all of the legally required information for the application to be considered and that the application is compliant with the applicable standards for approval of the application.(B)If the special district does not approve the application within 30 days of receiving the notice, the applicant may seek a writ of mandate to compel approval of the application. The writ of mandate shall be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.(e)Except as provided in paragraph (4) of subdivision (d), this section does not limit the amount of comments, feedback, revisions, or requests for additional information a special district may provide to an applicant or to a local agency.(f)Except as provided in paragraph (4) of subdivision (d), this section does not require the special district to approve the application or serve the housing development project within a specified time period.(g)For purposes of this section, the following definitions apply:(1)Housing development project has the same meaning as defined in paragraph (3) of subdivision (b) of Section 65905.5.(2)Local agency means any city, county, or city and county.(3)Postentitlement phase permit has the same meaning as defined in Section 65913.3.(4)Special district has the same meaning as defined in Section 56036.SEC. 3.SEC. 2.The amendments of paragraph (5) of subdivision (d) of, and subclause (I) of clause (i) of subparagraph (A) of paragraph (3) of subdivision (j) of of, Section 65913.3 of, of the Government Code made by this act does do not constitute a change in, but is are declaratory of, existing law.
SEC. 4.SEC. 3.The Legislature finds and declares that Section 1 of this act amending Section 65913.3 of the Government Code addresses a matter of statewide concern rather than a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 1 of this act applies to all cities, including charter cities.
SEC. 5.SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
REVISIONS: HeadingLine 3.(a)(1)A local agency shall compile one or more lists that shall specify in detail the information that will be required from any applicant for a postentitlement phase permit. The local agency may revise the lists of information required from an applicant. Any revised list shall not apply to any permit pending review.
(2)A local agency shall post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least five types of housing development projects in the jurisdiction, including, but not limited to, accessory dwelling unit, duplex, multifamily, mixed use, and townhome.
(3)A local agency shall make the items required by paragraphs (1) and (2) available on the agencys internet website no later than January 1, 2024.
(b)(1)(A)A local agency shall determine whether an application for a postentitlement phase permit is complete and provide written notice of this determination to the applicant not later than 15 business days after the local agency received the application.
(B)If the local agency determines an application is incomplete, the local agency shall provide the applicant with a list of incomplete items and a description of how the application can be made complete. The list shall be limited to incomplete items that are included on the lists required by paragraph (1) of subdivision (a). The list and description shall be provided with the written notice required by subparagraph (A).
(2)(A)After receiving a notice that the application was incomplete, an applicant may cure and address the items that are deemed to be incomplete by the local agency.
(B)In the review of an application submitted pursuant to subparagraph (A), the local agency shall not require the application to include an item that was not included in the list required by subparagraph (B) of paragraph (1).
(C)If an applicant submits an application pursuant to subparagraph (A), the local agency shall determine whether the additional application has remedied all incomplete items listed in the determination issued pursuant to subparagraph (B) of paragraph (1). This additional application is subject to the timelines and requirements specified in subparagraph (A) of paragraph (1).
(3)If a local agency does not make a timely determination as required by paragraph (1) or (2) and the application or resubmitted application states that it is for a postentitlement phase permit, the application or resubmitted application shall be deemed to be complete for the purposes of this chapter.
(c)(1)(A)For housing development projects with 25 units or fewer, a local agency shall complete the review and do either of the following:
(i)If the local agency determines that the complete application is not compliant with the permit standards, return in writing a full set of comments to the applicant with a comprehensive request for revisions.
(ii)If the local agency determines that the complete application is compliant with the permit standards, return the approved permit application on each postentitlement phase permit requested.
(B)The local agency shall immediately transmit that determination to the applicant by electronic mail and, if applicable, by posting the response on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 not later than 30 business days after the local agency determines that an application for a postentitlement phase permit is complete pursuant to subdivision (b).
(C)As part of its review, the local agency shall not require or request more than two plan check and specification reviews in connection with an application for a building permit. permit, unless the local agencys requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety.
(D)If the local agency fails to make a determination pursuant to subparagraph (A) within 30 business days after the application is deemed complete, the applicant may contract with or employ a licensed professional engineer or architect to check the plans and specifications for compliance with the permit standards at the applicants own expense.(2)(A)For housing development projects with 26 units or more, a local agency shall complete the review and do either of the following:
(i)If the local agency determines that the complete application is not compliant with the permit standards, return in writing a full set of comments to the applicant with a comprehensive request for revisions.
(ii)If the local agency determines that the complete application is compliant with the permit standards, return the approved permit application on each postentitlement phase permit requested.
(B)The local agency shall immediately transmit that determination to the applicant by electronic mail and, if applicable, by posting the response on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 not later than 60 business days after the local agency determines that an application for a postentitlement phase permit is complete pursuant to subdivision (b).
(C)As part of its review, the local agency shall not require or request more than two plan check and specification reviews in connection with an application for a building permit. permit, unless the local agencys requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety.
(D)If the local agency fails to make a determination pursuant to subparagraph (A) within 60 business days after the application is deemed complete, the applicant may contract with or employ a licensed professional engineer or architect to check the plans and specifications for compliance with the permit standards at the applicants own expense.(3)Once a local agency determines that a postentitlement permit is compliant with applicable permit standards pursuant to paragraph (1) or (2) (2), the local agency shall not subject the postentitlement phase permit to any appeals or additional hearing requirements.
(4)(A)The time limits in this subdivision shall not apply if the local agency makes written findings within the time limits specified in paragraph (1) or (2) based on substantial evidence in the record that the proposed postentitlement phase permit might have a specific, adverse impact on public health or safety and that additional time is necessary to process the application.
(B)For the purposes of this paragraph, specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.(d)(1)If a local agency finds that a complete application is noncompliant, the local agency shall provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within the time limits specified in subdivision (c).
(2)The local agency shall provide the list and description authorized by paragraph (1) when it transmits its determination to the applicant as required by subdivision (c).
(3)If a local agency denies a postentitlement phase permit application based on a determination that the application is noncompliant, the applicant may attempt to remedy the application.
(4)If an applicant submits an application pursuant to paragraph (3), the additional application is subject to the timelines of a new application as specified in subdivision (c).
(5)The local agency shall not request or require any action or inaction as a result of a site inspection that would represent a deviation from a previously approved plan or similar approval for the project. project, unless the local agencys requirement or request is accompanied by written findings based on substantial evidence in the record that both of the following apply:
(A)A reasonable person could not interpret the previously approved plan or similar approval as being compliant with the applicable standards.
(B)The deviation is necessary to address a specific, adverse impact on public health or safety.
(e)(1)If a postentitlement phase permit is determined to be incomplete under subdivision (b) or denied or determined to be noncompliant under subdivision (c) or (d), the local agency shall provide a process for the applicant to appeal that decision in writing to the governing body of the agency or, if there is no governing body, to the director of the agency, as provided by that agency.
(2)(A)With respect to a postentitlement phase permit concerning housing development projects with 25 units or fewer, a local agency on the appeal shall provide a final written determination by not later than 15 30 business days after receipt of the applicants written appeal.
(B)With respect to a postentitlement phase permit concerning housing development projects with 26 units or more, a local agency on the appeal shall provide a final written determination by not later than 30 45 business days after receipt of the applicants written appeal.
(3)If the applicants appeal pursuant to this subdivision is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required, the applicant may seek a writ of mandate to compel approval of the application. The writ of mandate shall be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
(f)If a local agency violates this section, it shall be in violation of Section 65589.5.
(g)Except as provided in subparagraph (D) of paragraph (1) of, and subparagraph (D) of paragraph (2) of, subdivision (c), this section does not place limitations on the amount of feedback that a local agency may provide or revisions that a local agency may request of an applicant.
(h)For residential or residential mixed-use developments that are subject to the requirements set forth in Section 65913.4, the provisions of paragraph (2) of subdivision (h) of Section 65913.4 shall apply. Permits for these developments that are subject to paragraph (2) of subdivision (h) of Section 65913.4 shall not be in conflict with the requirements of this section. The local agency shall comply with both sets of standards.
(i)This section does not preclude an applicant and a local agency from mutually agreeing to an extension of any time limit provided by this section. However, a local agency shall not require an agreement as a condition of accepting the application for, or processing of, a postentitlement phase permit, unless the agreement is obtained for the purpose of permitting concurrent processing of related approvals or an environmental review on the same housing development project.
(j)For purposes of this section, the following definitions apply:
(1)Housing development project has the same meaning as in paragraph (3) of subdivision (b) of Section 65905.5.
(2)Local agency means any county, city, or city and county.
(3)(A)Postentitlement phase permit includes both of the following:
(i)All nondiscretionary permits and reviews that are required or issued by the local agency after the entitlement process has been completed to begin construction of a development that is intended to be at least two-thirds residential, excluding discretionary and ministerial planning permits, entitlements, and other permits and reviews that are covered under Chapter 4.5 (commencing with Section 65920). A postentitlement phase permit includes, but is not limited to, all of the following:
(I)Building permits, and all interdepartmental review required for the issuance of a building permit, including plan checking and site inspection.
(II)Permits for minor or standard off-site improvements.
(III)Permits for demolition.
(IV)Permits for minor or standard excavation and grading.
(ii)All building permits and other permits issued under the California Building Standards Code (Title 24 of the California Code of Regulations) or any applicable local building code for the construction, demolition, or alteration of buildings, whether discretionary or nondiscretionary.
(B)A local agency may identify by ordinance a threshold for determining whether a permit constitutes a minor or standard permit for the purposes of this paragraph, which shall be supported by written findings adopted by the jurisdiction.
(C)A postentitlement phase permit does not include a permit required and issued by the California Coastal Commission, a special district, a utility that is not owned and operated by a local agency, or any other entity that is not a city, county, or city and county.
(4)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
SEC. 2.Section 65913.3.1 of the Government Code is amended to read:65913.3.1.(a)This section applies to both of the following:
(1)An application from a housing development project for service from a special district.
(2)An application from a housing development project for a postentitlement phase permit that a local agency deemed complete pursuant to subdivision (b) of Section 65913.3 that requires separate approval from a special district.
(b)A special district that receives an application pursuant to subdivision (a) shall provide written notice to the applicant, pursuant to the timelines specified in subdivision (c), of, the next steps in the review process, including, but not limited to, any additional information that may be required to begin to review the application for service or approval.
(c)(1)For a housing development with 25 units or fewer, a special district shall provide the written notice required by subdivision (b) within 30 business days of receipt of the application.
(2)For a housing development with 26 units or more, a special district shall provide the written notice required by subdivision (b) within 60 business days of receipt of the application.
(d)(1)After receiving notice that an application requires additional information pursuant to subdivision (b), an applicant may provide the requested information directly to the special district.
(2)A special district that receives additional information pursuant to paragraph (1) shall respond to the applicant with a notice that contains the information or next steps required by subdivision (b) in the applicable time period described by subdivision (c).
(3)A special district shall continue to review each submission by an applicant to determine additional relevant information and provide written notice of the next steps or additional information required in the applicable time periods described in subdivision (c) of each submission by the applicant.
(4)(A)Following receipt of a notice pursuant to paragraph (2), the applicant may provide a written response to the special district notifying the special district that the applicant believes that it has submitted all of the legally required information for the application to be considered and that the application is compliant with the applicable standards for approval of the application.
(B)If the special district does not approve the application within 15 30 days of receiving the notice, the applicant may seek a writ of mandate to compel approval of the application. The writ of mandate shall be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
(e)Except as provided in paragraph (4) of subdivision (d), this section does not limit the amount of comments, feedback, revisions, or requests for additional information a special district may provide to an applicant or to a local agency.
(f)Except as provided in paragraph (4) of subdivision (d), this section does not require the special district to approve the application or serve the housing development project within a specified time period.
(g)For purposes of this section, the following definitions apply:
(1)Housing development project has the same meaning as defined in paragraph (3) of subdivision (b) of Section 65905.5.
(2)Local agency means any city, county, or city and county.
(3)Postentitlement phase permit has the same meaning as defined in Section 65913.3.
(4)Special district has the same meaning as defined in Section 56036.
SEC. 3.The amendments of paragraph (5) of subdivision (d) of, and subclause (I) of clause (i) of subparagraph (A) of paragraph (3) of subdivision (j) of Section 65913.3 of, the Government Code made by this act does not constitute a change in, but is declaratory of, existing law.
SEC. 4.The Legislature finds and declares that Section 1 of this act amending Section 65913.3 of the Government Code addresses a matter of statewide concern rather than a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 1 of this act applies to all cities, including charter cities.
SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)(1)A local agency shall compile one or more lists that shall specify in detail the information that will be required from any applicant for a postentitlement phase permit. The local agency may revise the lists of information required from an applicant. Any revised list shall not apply to any permit pending review.
(2)A local agency shall post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least five types of housing development projects in the jurisdiction, including, but not limited to, accessory dwelling unit, duplex, multifamily, mixed use, and townhome.
(3)A local agency shall make the items required by paragraphs (1) and (2) available on the agencys internet website no later than January 1, 2024.
(b)(1)(A)A local agency shall determine whether an application for a postentitlement phase permit is complete and provide written notice of this determination to the applicant not later than 15 business days after the local agency received the application.
(B)If the local agency determines an application is incomplete, the local agency shall provide the applicant with a list of incomplete items and a description of how the application can be made complete. The list shall be limited to incomplete items that are included on the lists required by paragraph (1) of subdivision (a). The list and description shall be provided with the written notice required by subparagraph (A).
(2)(A)After receiving a notice that the application was incomplete, an applicant may cure and address the items that are deemed to be incomplete by the local agency.
(B)In the review of an application submitted pursuant to subparagraph (A), the local agency shall not require the application to include an item that was not included in the list required by subparagraph (B) of paragraph (1).
(C)If an applicant submits an application pursuant to subparagraph (A), the local agency shall determine whether the additional application has remedied all incomplete items listed in the determination issued pursuant to subparagraph (B) of paragraph (1). This additional application is subject to the timelines and requirements specified in subparagraph (A) of paragraph (1).
(3)If a local agency does not make a timely determination as required by paragraph (1) or (2) and the application or resubmitted application states that it is for a postentitlement phase permit, the application or resubmitted application shall be deemed to be complete for the purposes of this chapter.
(c)(1)(A)For housing development projects with 25 units or fewer, a local agency shall complete the review and do either of the following:
(i)If the local agency determines that the complete application is not compliant with the permit standards, return in writing a full set of comments to the applicant with a comprehensive request for revisions.
(ii)If the local agency determines that the complete application is compliant with the permit standards, return the approved permit application on each postentitlement phase permit requested.
(B)The local agency shall immediately transmit that determination to the applicant by electronic mail and, if applicable, by posting the response on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 not later than 30 business days after the local agency determines that an application for a postentitlement phase permit is complete pursuant to subdivision (b).
(C)As part of its review, the local agency shall not require or request more than two plan check and specification reviews in connection with an application for a building permit.
(D)If the local agency fails to make a determination pursuant to subparagraph (A) within 30 business days after the application is deemed complete, the applicant may contract with or employ a licensed professional engineer or architect to check the plans and specifications for compliance with the permit standards at the applicants own expense.
(2)(A)For housing development projects with 26 units or more, a local agency shall complete the review and do either of the following:
(i)If the local agency determines that the complete application is not compliant with the permit standards, return in writing a full set of comments to the applicant with a comprehensive request for revisions.
(ii)If the local agency determines that the complete application is compliant with the permit standards, return the approved permit application on each postentitlement phase permit requested.
(B)The local agency shall immediately transmit that determination to the applicant by electronic mail and, if applicable, by posting the response on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 not later than 60 business days after the local agency determines that an application for a postentitlement phase permit is complete pursuant to subdivision (b).
(C)As part of its review, the local agency shall not require or request more than two plan check and specification reviews in connection with an application for a building permit.
(D)If the local agency fails to make a determination pursuant to subparagraph (A) within 60 business days after the application is deemed complete, the applicant may contract with or employ a licensed professional engineer or architect to check the plans and specifications for compliance with the permit standards at the applicants own expense.
(3)Once a local agency determines that a postentitlement permit is compliant with applicable permit standards pursuant to paragraph (1) or (2) the local agency shall not subject the postentitlement phase permit to any appeals or additional hearing requirements.
(4)(A)The time limits in this subdivision shall not apply if the local agency makes written findings within the time limits specified in paragraph (1) or (2) based on substantial evidence in the record that the proposed postentitlement phase permit might have a specific, adverse impact on public health or safety and that additional time is necessary to process the application.
(B)For the purposes of this paragraph, specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(5)If the local agency requires review of the application by an outside entity, the time limits in this subdivision shall be tolled until the outside entity completes the review and returns the application to the local agency, at which point the local agency shall complete the review within the time remaining under the time limit, provided that the local agency notifies the applicant within three business days by electronic mail and, if applicable, by posting the notification on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 of the tolling and resumption of the time limit.(d)(1)If a local agency finds that a complete application is noncompliant, the local agency shall provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within the time limits specified in subdivision (c).
(2)The local agency shall provide the list and description authorized by paragraph (1) when it transmits its determination to the applicant as required by subdivision (c).
(3)If a local agency denies a postentitlement phase permit application based on a determination that the application is noncompliant, the applicant may attempt to remedy the application.
(4)If an applicant submits an application pursuant to paragraph (3), the additional application is subject to the timelines of a new application as specified in subdivision (c).
(5)The local agency shall not request or require any action or inaction as a result of a site inspection that would represent a deviation from a previously approved plan or similar approval for the project.
(e)(1)If a postentitlement phase permit is determined to be incomplete under subdivision (b) or denied or determined to be noncompliant under subdivision (c) or (d), the local agency shall provide a process for the applicant to appeal that decision in writing to the governing body of the agency or, if there is no governing body, to the director of the agency, as provided by that agency. A city or county shall provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
(2)(A)With respect to a postentitlement phase permit concerning housing development projects with 25 units or fewer, a local agency on the appeal shall provide a final written determination by not later than 60 15 business days after receipt of the applicants written appeal. The fact that an appeal is permitted to both the planning commission and to the governing body does not extend the 60-business-day period.
(B)With respect to a postentitlement phase permit concerning housing development projects with 26 units or more, a local agency on the appeal shall provide a final written determination by not later than 90 30 business days after receipt of the applicants written appeal. The fact that an appeal is permitted to both the planning commission and to the governing body does not extend the 90-business-day period.
(3)If the applicants appeal pursuant to this subdivision is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required, the applicant may seek a writ of mandate to compel approval of the application. The writ of mandate shall be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
(f)If a local agency fails to meet the time limits in violates this section, it shall be in violation of Section 65589.5.
(g)This Except as provided in subparagraph (D) of paragraph (1) of, and subparagraph (D) of paragraph (2) of, subdivision (c), this section does not place limitations on the amount of feedback that a local agency may provide or revisions that a local agency may request of an applicant.
(h)For residential or residential mixed-use developments that are subject to the requirements set forth in Section 65913.4, the provisions of paragraph (2) of subdivision (h) of Section 65913.4 shall apply. Permits for these developments that are subject to paragraph (2) of subdivision (h) of Section 65913.4 shall not be in conflict with the requirements of this section. The local agency shall comply with both sets of standards.
(i)This section does not preclude an applicant and a local agency from mutually agreeing to an extension of any time limit provided by this section. However, a local agency shall not require an agreement as a condition of accepting the application for, or processing of, a postentitlement phase permit, unless the agreement is obtained for the purpose of permitting concurrent processing of related approvals or an environmental review on the same housing development project.
(j)For purposes of this section, the following definitions apply:
(1)Housing development project has the same meaning as in paragraph (3) of subdivision (b) of Section 65905.5.
(2)Local agency means any county, city, or city and county.
(3)(A)Postentitlement phase permit includes both of the following:
(i)All nondiscretionary permits and reviews that are required or issued by the local agency after the entitlement process has been completed to begin construction of a development that is intended to be at least two-thirds residential, excluding discretionary and ministerial planning permits, entitlements, and other permits and reviews that are covered under Chapter 4.5 (commencing with Section 65920). A postentitlement phase permit includes, but is not limited to, all of the following:
(I)Building permits, and all interdepartmental review required for the issuance of a building permit. permit, including plan checking and site inspection.
(II)Permits for minor or standard off-site improvements.
(III)Permits for demolition.
(IV)Permits for minor or standard excavation and grading.
(ii)All building permits and other permits issued under the California Building Standards Code (Title 24 of the California Code of Regulations) or any applicable local building code for the construction, demolition, or alteration of buildings, whether discretionary or nondiscretionary.
(B)A local agency may identify by ordinance a threshold for determining whether a permit constitutes a minor or standard permit for the purposes of this paragraph, which shall be supported by written findings adopted by the jurisdiction.
(C)A postentitlement phase permit does not include a permit required and issued by the California Coastal Commission, a special district, a utility that is not owned and operated by a local agency, or any other entity that is not a city, county, or city and county.
SEC. 2.Section 65913.3.1 of the Government Code is amended to read:65913.3.1.(a)This section applies to both of the following:
(1)An application from a housing development project for service from a special district.
(2)An application from a housing development project for a postentitlement phase permit that a local agency deemed complete pursuant to subdivision (b) of Section 65913.3 that requires separate approval from a special district.
(b)A special district that receives an application pursuant to subdivision (a) shall provide written notice to the applicant, pursuant to the timelines specified in subdivision (c), of, the next steps in the review process, including, but not limited to, any additional information that may be required to begin to review the application for service or approval.
(c)(1)For a housing development with 25 units or fewer, a special district shall provide the written notice required by subdivision (b) within 30 business days of receipt of the application.
(2)For a housing development with 26 units or more, a special district shall provide the written notice required by subdivision (b) within 60 business days of receipt of the application.
(d)(1)After receiving notice that an application requires additional information pursuant to subdivision (b), an applicant may provide the requested information directly to the special district.
(2)A special district that receives additional information pursuant to paragraph (1) shall respond to the applicant with a notice that contains the information or next steps required by subdivision (b) in the applicable time period described by subdivision (c).
(3)A special district shall continue to review each submission by an applicant to determine additional relevant information and provide written notice of the next steps or additional information required in the applicable time periods described in subdivision (c) of each submission by the applicant.
(4)(A)Following receipt of a notice pursuant to paragraph (2), the applicant may provide a written response to the special district notifying the special district that the applicant believes that it has submitted all of the legally required information for the application to be considered and that the application is compliant with the applicable standards for approval of the application.
(B)If the special district does not approve the application within 15 days of receiving the notice, the applicant may seek a writ of mandate to compel approval of the application. The writ of mandate shall be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
(e)This Except as provided in paragraph (4) of subdivision (d), this section does not limit the amount of comments, feedback, revisions, or requests for additional information a special district may provide to an applicant or to a local agency.
(f)This Except as provided in paragraph (4) of subdivision (d), this section does not require the special district to approve the application or serve the housing development project within a specified time period.
(g)For purposes of this section, the following definitions apply:
(1)Housing development project has the same meaning as defined in paragraph (3) of subdivision (b) of Section 65905.5.
(2)Local agency means any city, county, or city and county.
(3)Postentitlement phase permit has the same meaning as defined in Section 65913.3.
(4)Special district has the same meaning as defined in Section 56036.
SEC. 3.The amendments of paragraph (5) of subdivision (d) of, and subclause (I) of clause (i) of subparagraph (A) of paragraph (3) of subdivision (j) of Section 65913.3 of, the Government Code made by this act does not constitute a change in, but is declaratory of, existing law.
SEC. 4.The Legislature finds and declares that Section 1 of this act amending Section 65913.3 of the Government Code addresses a matter of statewide concern rather than a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 1 of this act applies to all cities, including charter cities.
SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
SECTION 1.It is the intent of the Legislature to enact subsequent legislation that amends provisions of the Planning and Zoning Law related to housing development approvals, including Chapter 4.2 (commencing with Section 65913) of Division 1 of Title 7 of the Government Code, to further expedite the residential development process by strengthening provisions governing postentitlement phase permits.It is the intent of the Legislature to enact subsequent legislation that amends provisions of the Planning and Zoning Law related to housing development approvals, including Chapter 4.2 (commencing with Section 65913) of Division 1 of Title 7 of the Government Code, to further expedite the residential development process by strengthening provisions governing postentitlement phase permits.
|
Date
|
Status
|
|---|---|
| Aug 29, 2025 | In committee: Held under submission. |
| Aug 18, 2025 | In committee: Referred to suspense file. |
| Jul 17, 2025 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 16, 2025 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 9. Noes 0.) (July 15). |
| Jul 3, 2025 | Read second time and amended. Re-referred to Com. on HOUSING. |
| Jul 2, 2025 | From committee: Amend, and do pass as amended and re-refer to Com. on HOUSING. (Ayes 6. Noes 0.) (July 2). |
| Jun 25, 2025 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on L. GOV. |
| Jun 18, 2025 | Referred to Coms. on L. GOV. and HOUSING. |
| Jun 5, 2025 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Jun 4, 2025 | Read third time. Passed. Ordered to the Senate. (Ayes 76. Noes 0. Page 2056.) |
| May 27, 2025 | Read second time. Ordered to third reading. |
| May 23, 2025 | From committee: Do pass. (Ayes 14. Noes 0.) (May 23). |
| May 23, 2025 | Coauthors revised. |
| May 14, 2025 | In committee: Set, first hearing. Referred to suspense file. |
| May 1, 2025 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 11. Noes 0.) (April 30). Re-referred to Com. on APPR. |
| Apr 28, 2025 | Re-referred to Com. on H. & C.D. |
| Apr 24, 2025 | Read second time and amended. |
| Apr 23, 2025 | From committee: Amend, and do pass as amended and re-refer to Com. on H. & C.D. (Ayes 10. Noes 0.) (April 23). |
| Apr 21, 2025 | (Pending re-refer to Com. on H. & C. D.) |
| Apr 21, 2025 | Assembly Rule 56 suspended. (Page 1163.) |
| Apr 10, 2025 | Re-referred to Com. on L. GOV. |
| Apr 9, 2025 | From committee chair, with author's amendments: Amend, and re-refer to Com. on L. GOV. Read second time and amended. |
| Mar 25, 2025 | Re-referred to Com. on L. GOV. |
| Mar 24, 2025 | From committee chair, with author's amendments: Amend, and re-refer to Com. on L. GOV. Read second time and amended. |
| Mar 24, 2025 | Referred to Coms. on L. GOV. and H. & C.D. |
| Feb 15, 2025 | From printer. May be heard in committee March 17. |
| Feb 14, 2025 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 18, 2025 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jul 15, 2025 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Housing |
Passed |
|
| Jul 2, 2025 | Do pass as amended, but first amend, and re-refer to the Committee on [Housing] | Senate Standing Committee on Local Government |
Passed |
|
| Jun 4, 2025 | AB 660 Wilson Assembly Third Reading | Assembly Floor |
Passed |
|
| May 23, 2025 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 30, 2025 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Housing and Community Development |
Passed |
|
| Apr 23, 2025 | Do pass as amended and be re-referred to the Committee on [Housing and Community Development] | Assembly Standing Committee on Local Government |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Abundant Housing LA | ** Support | |
| Associated General Contractors, California Chapters | ** Support | |
| Associated General Contractors of America, San Diego Chapter | ** Support | |
| Bay Area Council | ** Support | |
| BOMA California | ** Support | |
| California Apartment Association | ** Support | |
| California Association Of Realtors | ** Support | |
| California Builders Alliance | ** Support | |
| California Building Industry Association | ** Support | |
| California Business Properties Association | ** Support | |
| California Business Roundtable | ** Support | |
| California Housing Consortium | ** Support | |
| California Housing Partnership | ** Support | |
| California Retailers Association | ** Support | |
| California YIMBY | ** Support | |
| Circulate San Diego | ** Support | |
| City of Murrieta | ** Against | |
| City of Thousand Oaks | ** Against | |
| County of Santa Barbara | ** Against | |
| El Dorado County Chamber of Commerce | ** Support | |
| El Dorado Hills Chamber of Commerce | ** Support | |
| Elevate California | ** Support | |
| Elk Grove Chamber Of Commerce | ** Support | |
| Folsom Chamber Of Commerce | ** Support | |
| Housing Action Coalition | ** Support | |
| Housing California | ** Support | |
| Housing Leadership Council of San Mateo | ** Support | |
| Housing Trust Silicon Valley | ** Support | |
| Inner City Law Center | ** Support | |
| Institute for Responsive Government Action | ** Support | |
| LeadingAge California | ** Support | |
| League Of California Cities | ** Against | |
| Lieutenant Governor Eleni Kounalakis | ** Support | |
| lincoln area chamber of commerce | ** Support | |
| MidPen Housing | ** Support | |
| Naiop California | ** Support | |
| Rancho Cordova Chamber of Commerce | ** Support | |
| Rocklin Area Chamber of Commerce | ** Support | |
| Roseville Area Chamber Of Commerce | ** Support | |
| Sacramento Regional Builders Exchange | ** Support | |
| Shingle Springs/cameron Park Chamber of Commerce | ** Support | |
| Southern California Leadership Council | ** Support | |
| South Pasadena Residents for Responsible Growth | ** Support | |
| SPUR | ** Support | |
| United Chamber Advocacy Network | ** Support | |
| Yuba Sutter Chamber of Commerce | ** Support |
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
AB 660 (Wilson) - Planning and Zoning Law: postentitlement phase permits: Housing Accountability Act
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
AB 660 would make various changes to the time limits and procedures for local agency review and approval of post-entitlement permits, as specified.
Fiscal Impact:
- The Department of Housing and Community Development (HCD) notes that this bill’s expansion of the scope of violations of the Housing Accountability Act (HAA) would result in an increase in requests for enforcement action and instances in which the department is required to notify the Attorney General of violations. HCD estimates that any increased enforcement workload can be addressed by existing staff and would be absorbable. (General Fund)
- Unknown local mandated costs for local agencies to revise processes and procedures regarding the review and approval of post-entitlement permit applications, and to act on appeals of permit denials on an expedited timeline. These costs are not state-reimbursable because local agencies have the general authority to charge various permit, planning, and developer fees to offset any increased costs associated with the higher level of service required by this bill. (local funds)
- Unknown court cost pressures for new workload to adjudicate additional cases filed by permit applicants seeking a writ of mandate to compel a local agency to approve an application when it denies an administrative appeal or fails to decide on the appeal within specified timeframes. The number of cases that would be filed statewide as a result of the bill are unknown. Staff notes that it generally costs about $10,500 to operate a courtroom for one eight-hour day. Although courts are not funded on the basis of workload, increased staff time and resources may create a need for additional support from the General Fund to support court operations. The 2025-26 Budget includes $38 million in ongoing support from the General Fund to backfill the current fund imbalance in the Trial Court Trust Fund and help pay for court operations, (Trial Court Trust Fund, General Fund).
Background:
Once a housing project receives entitlement (approval) from the local planning department, the developer must obtain a range of nondiscretionary administrative permits, referred to as post-entitlement permits, to complete the work to construct or modify a building. These permits can include building permits and other permits for: demolition; grading; excavation; electrical, plumbing, or mechanical work; encroachment in the public right-of-way; roofing; water and sewer connections, or septic systems; fire sprinklers; and home occupations. During the post-entitlement stage, housing project plans are reviewed for consistency with state housing law, which provides requirements and procedures to protect the health, safety, and general welfare of the public and occupants of housing and accessory buildings. Plans are checked for consistency with the state building codes, fire codes, energy codes, and green building standards.
Existing law, established by AB 2234 (Rivas), Chap. 651/2022, established time limits local agencies must follow to determine post-entitlement phase permit application completeness (15 days), to approve or deny post-entitlement permits (30 or 60 days from receipt of a complete application, depending on the size of the development), and to make final determinations on applicant appeals (60 or 90 days, depending on the size of the development). If a local agency determines that a post-entitlement permit application is incomplete, it must provide the applicant with a list of incomplete items and a description of how to correct application deficiencies and resubmit the application for approval, as specified. If a local agency finds that a completed application is noncompliant, it must also provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied. If a local agency fails to meet those specified time limits, it is considered a violation of the Housing Accountability Act. HCD has enforcement authority over the HAA and may initiate enforcement reviews based on various sources, including applicant complaints.
Proposed Law:
AB 660 would make the failure of a local agency to comply with certain requirements in the post-entitlement permit review and approval process a violation of the HAA subject to enforcement. The bill would also make the following changes to the process for local agency review and approval of post-entitlement phase permits:
- Prohibit a local agency, when reviewing a completed building permit application, from requiring or requesting more than two plan check and specification reviews, unless additional review is necessary to address a specific, adverse impact on public health and safety, based on substantial evidence in the record.
- Explicitly authorize a local agency to deny a noncompliant application following two reviews, and to request additional submittals of applications that are not compliant.
- Specify that the limitation on submittals is only applicable to building permits and no other post-entitlement phase permits.
- Limit the applicability of tolling provisions specified in post-entitlement permit law to circumstances in which a permit requires review by another public agency (rather than any outside entity).
- Prohibit a local agency from requesting or requiring any action or inaction as a result of a building inspection that would represent a deviation from a previously approved plan or similar approval for the project, unless the local agency’s requirement or request is accompanied by written findings based on substantial evidence in the record that both of the following apply:
- A reasonable person could not interpret the previously approved plan or similar approval as being compliant with the applicable standards.
- The deviation is necessary to address a specific, adverse impact on public health or safety.
- Reduce the amount of time within which a local agency must provide a final written determination after receipt of an applicant’s written appeal of the agency’s decision that a post-entitlement permit application is incomplete or noncompliant as follows:
- Within 30 days of receiving the written appeal (rather than 60) for a project of 25 or fewer units
- Within 45 days of receiving the written appeal (rather than 90) for a project of 26 or more units.
- Authorize an applicant to seek a writ of mandate to compel approval of the application if the appeal is denied or if the local agency does not make a final determination on the appeal within the specified timeframes.
- Make a clarifying change to the definition of “post-entitlement phase permit” that an interdepartmental review of a building permit includes plan checking and building inspection.
Related Legislation:
AB 301 (Schiavo), an urgency measure which is pending on the Senate Floor, would establish specific timeframes for state departments to review and approve any required permits and approvals in the post-entitlement phase for housing development projects.
AB 2234 (R.Rivas), Chap. 651/2022, established time limits and procedures for local agency review and approval of post-entitlement permits, and required cities and counties to implement an online permitting system for post-entitlement permits
Staff Comments:
This bill would impose a state-mandated local program by requiring local agencies to revise processes and procedures regarding the review and approval of post-entitlement permit applications, and to act on appeals of permit denials on an expedited timeline. Staff notes, however, that any mandated local costs imposed by this bill would not be subject to state reimbursement because cities and counties have the authority to charge and adjust planning and permitting fees as necessary to cover administrative costs. Existing law authorizes planning and zoning fees to “include the costs reasonably necessary to prepare and revise the plans and policies that a local agency is required to adopt before it can make any necessary findings and determinations.” Case law and previous decisions by the Commission on State Mandates support the position that local governments’ planning costs are not reimbursable when the state imposes new planning mandates.
Recommended Amendments:
This bill amends Government Code Section 65589.5 to make a failure to comply with certain provisions of the bill a violation of the HAA. Staff notes that AB 130 (Budget Committee), Chap. 22/2025, the housing budget trailer bill, also amended this statute. This bill should be amended to avoid chaptering out enacted provisions of the budget trailer bill.
The bill also conflicts with numerous other bills that are pending in the Legislature, and additional amendments will be necessary to address other chaptering conflicts, should the bill be approved by this Committee.
-- END --
SENATE COMMITTEE ON HOUSING
Senator Aisha Wahab, Chair
2025 - 2026 Regular
Bill No: AB 660 Hearing Date: 7/15/2025
Author: | Wilson | ||
Version: | 7/3/2025 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Hank Brady | ||
SUBJECT: Planning and Zoning Law: postentitlement phase permits: Housing Accountability Act
DIGEST: This bill makes numerous changes to the postentitlement permit review process.
ANALYSIS:
Existing law:
Postentiltement Phase Permit Law
- Defines “postentitlement phase permit” as follows:
- All nondiscretionary permits required by a local agency after the entitlement process to begin construction of a development that is intended to be at least two-thirds residential, excluding specified planning permits, entitlements, and other permits. These permits include, but are not limited to, all of the following:
- Building permits, and all inter-departmental review required for the issuance of a building permit;
- Permits for minor or standard off-site improvements;
- Permits for demolition; and,
- Permits for minor or standard excavation and grading.
- Allows a local agency to identify by ordinance a threshold for determining whether a permit constitutes a “minor” or “standard” permit if supported by written findings; and,
- Excludes a permit required and issued by the California Coastal Commission (Commission), a special district, or a utility that is not owned and operated by a local agency, or any other entity that is not a city or county.
- All nondiscretionary permits required by a local agency after the entitlement process to begin construction of a development that is intended to be at least two-thirds residential, excluding specified planning permits, entitlements, and other permits. These permits include, but are not limited to, all of the following:
- Requires a local agency, defined to include a city or county, to compile one or more lists of information that will be required from any applicant for a postentitlement phase permit.
- Allows the local agency to revise the lists specified in (2), however, any revised list cannot apply to any permit pending review.
- Requires a local agency to also post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least five types of housing development projects in the jurisdiction, as specified. Requires the lists and example permits to be posted on the city’s or county’s website by January 1, 2024.
- Requires a local agency to determine whether an application for a postentitlement phase permit is complete and provide written notice of this determination to the applicant within 15 business days after the local agency received the application, as follows:
- If the local agency determines an application is incomplete, the local agency must provide the applicant with a list of incomplete items and a description of how the application can be made complete, but the local agency can’t request new information that wasn’t on the original list of required information;
- After receiving a notice that the application is incomplete, an applicant may cure and address the items that are deemed to be incomplete by the local agency. Upon receipt of a corrected application, the local agency must notify the applicant whether the additional application has remedied all incomplete items within 15 business days; and,
- If a local agency does not meet the timelines required for determining an application complete, and the application or resubmitted application states that it is for a postentitlement phase permit.
- Specifies a process for approving postentitlement permits, as follows:
- Requires local agencies to review and either return in writing a full set of comments to the applicant with a comprehensive request for revisions or return the approved permit application, and electronically notify the applicant of its determination within:
- Thirty business days of the application being deemed complete for housing development projects with 25 units or fewer; or,
- Sixty business days of the application being deemed complete for housing development projects with 26 units or more.
- Provides that these time limits do not apply if the local agency makes written findings within the applicable time limit that the proposed postentitlement phase permit might have a specific, adverse impact, as defined, on public health or safety and that additional time is necessary to process the application;
- Tolls the time limits for approval if the local agency requires review of the application by an outside entity, as specified;
- If a local agency finds that a complete application is noncompliant, the local agency must provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within the applicable time limit, as provided, and must allow the applicant to correct the application; and,
- Requires local agencies to establish an appeals process. If an applicant appeals, the local agency must make a final determination within:
- 60 business days of the appeal for a project of 25 units or fewer; or,
- 90 business days of the appeal for a project of 26 units or more.
- Requires local agencies to review and either return in writing a full set of comments to the applicant with a comprehensive request for revisions or return the approved permit application, and electronically notify the applicant of its determination within:
- Provides that failure to meet the time limits specified above constitutes a violation of the Housing Accountability Act (HAA).
- Allows extension of any of the time limits specified above upon mutual agreement by the local government and the applicant. However, a local agency cannot require as a condition of submitting the application that the applicant waive the time limits in this bill, with an exception for environmental review associated with the project.
This bill:
- Amends the penalty provisions of the HAA to specify that failure to comply with any provision of postentitlement phase permit law constitutes a violation of the HAA.
- Amends postentitlement phase permit law in the following ways:
- Establishes the following parameters regarding a local agency’s review of a complete building permit application:
- Provides that a local agency shall not require or request more than two plan check and specification reviews in connection with a complete building permit application unless the local agency makes written findings based on substantial evidence that additional review is necessary to address a specific, adverse impact on public health or safety.
- Specifies that a local agency may deny an application that is not compliant after two submittals, and an applicant may request additional submittals of applications that are not compliant with permit standards.
- Specifies that the limitation on submittals is only applicable to building permits and no other postentitlement phase permits.
- Establishes the following parameters regarding a local agency’s review of a complete building permit application:
- Removes a provision that tolls local agency review timelines while a postentitlement phase permit is subject to review by an outside entity.
- Prohibits a local agency from requesting or requiring any action or inaction as a result of a building inspection that would represent a deviation from a previously approved plan or similar approval for the project, unless the local agency’s requirement or request is accompanied by written findings based on substantial evidence in the record that both of the following apply:
- A reasonable person could not interpret the previously approved plan or similar approval as being compliant with the applicable standards; and,
- The deviation is necessary to address a specific, adverse impact on public health or safety.
- Reduces the amount of time within which a local agency must provide a final written determination after receipt of an applicant’s written appeal, specifically:
- Within 30 business days (instead of 60) of the appeal for a project of 25 units or fewer; or,
- Within 45 business days (instead of 90) of the appeal for a project of 26 units or more.
- Provides that if an applicant’s appeal of a postentitlement phase permit decision is denied, or if a decision on the applicant’s appeal is not decided within the required timelines, the applicant may seek a writ of mandate to compel approval of the application.
- Expands the definition of “postentitlement phase permit” to include plan checking and building inspections associated with a building permit.
Background
The Permit Streamlining Act (PSA). The PSA requires public agencies (both state and local agencies) to act fairly and promptly on applications for development proposals, including housing developments. Under the PSA, public agencies have 30 days to determine whether applications for development projects are complete and request additional information; failure to act results in an application being “deemed complete.” The PSA applies to the discretionary approval phase of a development review process; this is the phase where the agency, in its discretion, decides whether it approves of the concept outlined in the development proposal.
Postentitlement permits. A development proposal that is approved and entitled is still required to obtain approval for a range of non-discretionary permits. This includes building permits and other permits related to the physical construction of the development proposal. The timelines established in the PSA do not apply to these non-discretionary permits. The postentitlement phase of the review process typically involves the review of permits that are objective in nature. Generally, once an agency invests the time and effort to approve and entitle a development proposal, there is an incentive for the agency to process the postentitlement permits in a timely fashion.
In order to expedite this stage of the development approval process, AB 2234 (Robert Rivas, Chapter 651, Statutes of 2022), required local agencies (but not public agencies) to process post entitlement phase permits within 30 days for small housing development projects and 60 days for large housing development projects.
Comments
- Author’s Statement. “While California has taken many steps to address the housing crisis, there is still much work to be done. AB 660 aims to build on AB 2234 by closing gaps in existing law regarding the timelines for local agencies to review applications and act on post-entitlement permits and applications. The post-entitlement process has become a significant cog in the housing process, delaying construction and advancement across the state. AB 660 aims to ensure that our housing projects are approved and built on time, avoiding delays during the plan check process that often derail housing development. This legislation ensures that the standards we put on our local agencies are truly binding by empowering developers to seek legal action when these agency ‘shot clocks’ are violated. AB 660 moves to continue the streamlining of housing production in California, removing unnecessary plan checks and assuring that our local agencies abide by established deadlines.”
- Timelines for postentitlement permits. AB 2234 (Rivas, Chapter 651, Statutes of 2022) requires cities and counties to process non-discretionary postentitlement phase permits in an expedited manner. First, the city or county must determine whether an application is complete, and notify the applicant within 15 days after receiving the application. If the local agency determines an application is incomplete, the local agency must provide the applicant with a list of incomplete items and a description of how the application can be made complete. After receiving a notice that the application was incomplete, an applicant may cure and address the items that are deemed to be incomplete by the local agency. Upon receipt of a corrected application, the local agency must notify the applicant within 15 business days whether the additional application has remedied all incomplete items. If a local agency does not meet the timelines required for determining whether an application is complete, then the application or resubmitted application is deemed complete.
Cities and counties must then review the complete application within 30 days for projects with 25 units or less, and 60 days for projects 26 units or more, to determine if the application is compliant with the postentitlement permit requirements. Local agencies can extend the timeline if they make a finding that issuing the permit within the applicable time limit might have a specific, adverse impact on public health or safety. Finally, local agencies must also establish an appeals process. If an applicant appeals, the local agency must make a final determination within specified timelines.
- HAA. In 1982, in response to the housing crisis, which was viewed as threatening the economic, environmental, and social quality of life in California, the Legislature enacted the Housing Accountability Act (HAA), commonly referred to as the Anti-NIMBY Law. The purpose of the HAA is to help ensure that a city does not reject or make infeasible housing development projects that contribute to meeting the housing need determined pursuant to the Housing Element Law without a thorough analysis of the economic, social, and environmental effects of the action and without complying with the HAA. The HAA restricts a city’s ability to disapprove, or require density reductions in, certain types of residential projects. The HAA does not preclude a locality from imposing developer fees necessary to provide public services or requiring a housing development project to comply with objective standards, conditions, and policies appropriate to the locality’s share of the regional housing needs assessment.
If a locality denies approval or imposes conditions that have a substantial adverse effect on the viability or affordability of a housing development for very low-, low-, or moderate-income households, and the denial or imposition of conditions is subject to a court challenge, the burden is on the local government to show that its decision is consistent with specified written findings.
If a court finds that a locality violated the HAA, a court must issue an order or judgment compelling compliance with the HAA within 60 days, including but not limited to, an order that the locality take action on the housing development project or shelter. The plaintiff shall be entitled to attorney’s fees unless the court find that awarding fees would not further the purposes of the HAA. If a locality fails to comply within 60 days, the court shall impose fines, a minimum of $10,000 per housing unit in the housing development project, which shall be deposited in a local housing trust fund. The court may also approve the housing development project. If the court finds the locality acted in bad faith, in addition to other remedies, the court shall multiply the fine by a factor of five.
- Clarification needed. The HAA penalty provisions in existing law that apply to postentitlement phase permit law currently only apply to the time limits in the law. This bill adds additional limitations and requirements on local agencies and updates the cross reference in the HAA to reflect the expansion of requirements in postentitlement phase permit law. However, the expanded HAA penalties in this bill would also cover local agency duties to post information related to postentitlement phase permit law on their internet website. The penalty provisions of the HAA should focus on local agency actions related to approving or denying approvals for housing development projects. The Committee may wish to consider narrowing the scope of this cross reference.
Additionally, the bill removes language from existing law that tolls the shot clock for local agencies when a postentitlement phase permit is subject to review by an “outside entity.” This provision was originally intended to capture scenarios where a public agency that is independent of the jurisdiction is tasked with reviewing and approving an aspect of project in the postentitlement phase. Tolling was intended to ensure a local agency is not penalized for violating postentitlement phase permit timelines when an entity outside the control of the local agency is delaying the local agency review of the project. As written, the language in existing law could be misinterpreted to allow a local agency to waive timelines by hiring an “outside entity” such as a private firm to conduct review of a postentitlement phase permit. This bill would delete this provision entirely. While this provision should be narrowed, the Committee may wish to consider narrowing the reference to only allow timelines to be tolled when permits are subject to review by other public agencies, rather than any “outside entity.”
- Opposition. The League of California Cities is opposed to the bill and argues that the bill creates a one-size-fits-all approach to plan check and permit review. The League additionally expresses concerns about reducing the appeal timeframe and eliminating the tolling of permit timelines when a permit is with an outside entity for review.
- Committee Amendments. The author has agreed to the following amendments to address the issues identified above.
- Amend the HAA penalty provisions to exclude reference to the website posting requirements in postentitlement phase permit law.
- Recast the tolling provisions in postentitlement phase permit law but limit it to when a permit is subject to review by another public agency, rather than any “outside entity.”
- Correct an erroneous cross-reference in postentitlement phase permit law.
- Address other minor technical and clarifying issues.
- Traffic Jam. This bill is one of two bills that seeks to amend postentitlement phase permit law requirements. AB 301 (Schiavo, 2025) which this Committee heard in June, amends the exact same code section as this bill to apply postentitlement phase permit processing requirements to state agencies. The authors of these bills may wish to consolidate their efforts to avoid duplication and legislative chaptering issues should both bills move to the governor’s desk.
Related/Prior Legislation
AB 301 (Schiavo, 2025) — expands postentitlement phase permit processing requirements to state agencies.
AB 2234 (Rivas, Chapter 651, Statutes of 2022) — established timeframes for the review of postentitlement permits conducted by local governments.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
POSITIONS: (Communicated to the committee before noon on Wednesday, July 9, 2025.)
SUPPORT:
Abundant Housing LA
Associated General Contractors, California Chapters
Bay Area Council
California Apartment Association
California Building Industry Association
California Housing Consortium
California Yimby
Circulate San Diego
Housing Action Coalition
Housing Leadership Council of San Mateo
Housing Trust Silicon Valley
Inner City Law Center
Leadingage California
Lieutenant Governor Eleni Kounalakis
Midpen Housing
South Pasadena Residents for Responsible Growth
Spur
OPPOSITION:
City of Thousand Oaks
League of California Cities
-- END --
SENATE COMMITTEE ON LOCAL GOVERNMENT
Senator María Elena Durazo, Chair
2025 - 2026 Regular
Bill No: | AB 660 | Hearing Date: | 7/2/25 |
Author: | Wilson | Fiscal: | Yes |
Version: | 6/25/25 | Consultant: | Favorini-Csorba |
Planning and Zoning Law: postentitlement phase permits: Housing Accountability Act
Makes numerous changes to the postentitlement permit review process.
Background
The California Constitution allows cities and counties to “make and enforce within its limits, all local, police, sanitary and other ordinances and regulations not in conflict with general laws.” It is from this fundamental power (commonly called the police power) that cities and counties derive their authority to regulate behavior to preserve the health, safety, and welfare of the public—including land use authority.
State Housing Law. Prior to 1962, the Legislature established minimum building requirements for dwellings in statutory form, and these requirements only applied to incorporated cities, unless a county voluntarily adopted them. In 1962, the Legislature enacted State Housing Law, which provides requirements and procedures for uniform statewide code enforcement to protect the health, safety, and general welfare of the public and occupants of housing and accessory buildings. Among other things, State Housing Law delegates responsibility to state administrative agencies for the adoption of building standards, applies state building codes uniformly, and directs local agencies’ administration of code enforcement.
Building codes. The California Building Standards Code (Title 24 of the California Code of Regulations) contains building standards and regulations as adopted by the California Building Standards Commission (BSC). These standards include, among other requirements, structural standards for building safety (the Building Code), fire safety standards (the Fire Code), energy efficiency standards (the Energy Code), and standards for green buildings (CalGreen). The BSC updates the Building Standards Code on a three-year cycle—the BSC published new standards that went into effect on January 1, 2023. Once adopted at the state level, cities and counties in California then enact an ordinance to adopt the codes. New construction and improvements to existing buildings must comply with the current building codes, and improvements to an existing building may trigger additional code upgrades for other parts of a building.
Administrative permit approvals. A builder may need a range of administrative permits from the local agency in order to actually complete the work to construct or modify a building. These permits can include building permits and other permits for: demolition; grading; excavation; electrical, plumbing, or mechanical work; encroachment in the public right-of-way; roofing; water and sewer connections or septic systems; fire sprinklers; and home occupations.
City and county building departments enforce the provisions of the State Housing Law, the California Building Standards Code, and local zoning codes that specify the allowable forms and uses of buildings within a city or county’s jurisdiction. Within building departments, the positions responsible for evaluating building permits for compliance include building officials, inspectors, plan checkers, and civil engineers. State Housing Law also allows local agencies to hire private entities on a temporary basis to perform plan checking services. Some agencies contract out a portion of their workload during especially busy times, or certain portions of the building permit review process, such as reviewing compliance with energy efficiency requirements. Other local agencies contract out nearly all plan checking functions to a private firm.
Building permit approval requirements. Two state laws prescribe timelines for action on building permits by local agencies.
Excessive delay. State Housing Law requires local agencies to contract with a private entity on a temporary basis to perform the plan checking function, upon request of an applicant for a building permit, if there is an excessive delay in checking plans as part of a building permit application for a residential building of up to four units. An excessive delay means 30 days after submittal of a completed application, or 45 days for an application that required a resubmittal, including the days elapsed in the initial review. Similar provisions apply to building permits for non-residential buildings of up to three stories, but local agencies have 50 days for initial review and a total of 60 days if there was a resubmittal of the application. Local agencies that are required to contract out under State Housing Law can charge an applicant fees in an amount necessary to defray costs directly attributable to hiring someone to perform plan checking services.
Post-entitlement permitting. Additionally, in 2022, the Legislature enacted a framework establishing timelines and procedures for approving all local “post-entitlement permits,” including building permits, needed to construct housing that had already received approval from a planning department (AB 2234, R. Rivas, 2022). AB 2234 requires cities and counties to process non-discretionary permits in an expedited manner. First, the city or county must determine whether an application is complete, and notify the applicant, within 15 business days after receiving the application. If the local agency determines an application is incomplete, the local agency must provide the applicant with a list of incomplete items and a description of how the application can be made complete, but the local agency cannot request new information that was not on the original list of needed information. After receiving a notice the application was incomplete, an applicant may cure and address those items. Upon receipt of a corrected application, the local agency must notify the applicant within 15 business days whether the additional application has remedied all incomplete items. If a local agency does not meet the timelines required for determining whether an application is complete, and the application or resubmitted application states it is for a post-entitlement phase permit, AB 2234 deems the application or resubmitted application complete.
Cities and counties must then complete review of the application within 30 business days for projects with 25 units or less, and 60 business days for projects 26 units or more, unless the city or county finds that the permit might have a specific, adverse impact on public health or safety, within the applicable time limit. If the city or county requires review of the application by an outside entity, the time limits are tolled until the outside entity completes the review.
If a city or county finds a complete application is noncompliant, it must provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within the applicable time limit and must allow the applicant to correct the application.
Cities and counties must also establish an appeals process. If an applicant appeals, the local agency must make a final determination on the appeal within:
- 60 business days of the appeal for a project of 25 units or fewer; or
- 90 business days of the appeal for a project of 26 units or more.
AB 2234 also requires cities and counties to compile one or more lists of information that will be required from any applicant for a post-entitlement permit. Cities and counties can revise these lists, but revised lists cannot apply to pending permit reviews. The city or county must post an example of a complete set of post-entitlement permits for at least five types of housing projects. Cities and counties had to post these lists and examples by January 1, 2024.
Finally, AB 2234 requires cities and counties to process permits online. As of January 1, 2024, all local agencies in the County of Los Angeles, and all other cities and counties with populations of 75,000 or greater must process permits online, but can get a two-year extension if they make specified findings. All other cities and counties must comply by January 1, 2028, but may extend this deadline by five years if they make specified findings.
Although data since the enactment of AB 2234 is limited, as of December 2023, the timelines for projects to receive a building permit following entitlement range from 82 days for single-family homes to 277 days for apartment buildings of 5 or more units, according to the Department of Housing and Community Development’s (HCD’s) Annual Progress Report Dashboard. Homebuilders want the Legislature to expedite the building permit process.
Proposed Law
Post-entitlement permit processing changes. Assembly Bill 660 limits a local agency to two rounds of plan check and specification reviews while reviewing a building permit for a housing development proposal, unless the local agency’s requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety. The bill also repeals the provision that tolls the approval timeframes for post-entitlement permits if a local agency requires review by an outside entity.
AB 660 makes various changes to the process and requirements that apply if a postentitlement phase permit is determined to be incomplete or denied, or determined to be noncompliant. Specifically, it requires any appeals of a permit to be to the city council or board of supervisors and reduces the amount of time within which a local agency must provide a final written determination after receipt of an applicant’s written appeal, specifically:
- 30 business days (instead of 60) of the appeal for a project of 25 units or fewer; or
- 45 business days (instead of 90) of the appeal for a project of 26 units or more.
Other changes. AB 660 allows the applicant for a post-entitlement permit to seek a writ of mandate to compel approval of the application if the applicant’s appeal is unsuccessful. The court must grant the writ of mandate if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
AB 660 also prohibits a local agency from requesting or requiring any action or inaction as a result of a building inspection that would represent a deviation from a previously approved plan or similar approval for the project, unless the local agency’s requirement or request is accompanied by written findings based on substantial evidence in the record that both of the following apply:
- A reasonable person could not interpret the previously approved plan or similar approval as being compliant with the applicable standards; and
- The deviation is necessary to address a specific, adverse impact on public health or safety.
AB 660 also makes a number of technical and conforming changes, including a conforming change to the Housing Accountability Act’s definition of disapproval, and states that its changes to the writ of mandate process and the building inspection process are declaratory of existing law.
Comments
1. Purpose of the bill. According to the author, “While California has taken many steps to address the housing crisis, there is still much work to be done. AB 660 aims to build on AB 2234 by closing gaps in existing law regarding the timelines for local agencies to review applications and act on post-entitlement permits and applications. The post-entitlement process has become a significant cog in the housing process, delaying construction and advancement across the state. AB 660 aims to ensure that our housing projects are approved and built on time, avoiding delays during the plan check process that often derail housing development. This legislation ensures that the standards we put on our local agencies are truly binding by empowering developers to seek legal action when these agency ‘shot clocks’ are violated. AB 660 moves to continue the streamlining of housing production in California, removing unnecessary plan checks and assuring that our local agencies abide by established deadlines.”
2. Give me one reason. In land use disputes, courts tend to give a great deal of deference to a local government when determining whether a project is consistent with the local government’s own standards. Courts generally uphold a local government’s determination on consistency unless the court determines the local government has acted arbitrarily, capriciously, or without evidentiary basis.[1] In other words, a local government’s decision will be upheld unless no reasonable person could have made the same decision. AB 660 instead requires a court to grant a writ of mandate compelling a local agency to issue a post-entitlement permit if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards. Instead of deferring to a local government’s decision on a post-entitlement permit, like whether a building permit application complies with the building code, the court must side with the applicant for the permit so long as their position wasn’t unreasonable—even if there was evidence to the contrary. Supplanting a trained building official’s judgment with that of the applicant is particularly concerning for post-entitlement permits like building permits that deal with direct life safety issues: building officials may refrain from pointing out issues of noncompliance with a building permit if they think they might lose in court, potentially leading to less safe buildings. The Committee may wish to consider amending AB 660 to remove the provision of AB 660 that requires a court to grant a writ of mandate if a reasonable person could find the post-entitlement permit compliant.
3. Let’s be clear. The Committee may wish to consider the following amendments to AB 660 to improve clarity in the bill’s provisions:
- AB 660 prohibits a local agency from requiring more than two submittals of plans and specifications, except as specified. However, the bill is silent on what occurs if a permit application remains incomplete or noncompliant following those two submissions. The Committee may wish to consider amending AB 660 to explicitly allow a local agency to deny an incomplete or noncompliant permit and to allow an applicant to request additional submittals in the case of a permit that would be denied.
- AB 660 contains provisions that limit the ability of building officials to require deviations from approved plans as a result of inspections in the field and states that this provision is declaratory of existing law. While this provision is reasonable, existing law does not directly speak to this. The Committee may wish to consider amending AB 660 to remove the statement that this provision is declaratory of existing law.
4. Mandate. The California Constitution requires the state to reimburse local governments for the costs of new or expanded state mandated local programs. Because AB 660 imposes new duties on local officials, Legislative Counsel says that it imposes a new state mandate. AB 660 disclaims the state’s responsibility for providing reimbursement by citing local governments’ authority to charge for the costs of implementing the bill’s provisions.
5. Charter city. The California Constitution allows cities that adopt charters to control their own “municipal affairs.” In all other matters, charter cities must follow the general, statewide laws. Because the Constitution doesn’t define “municipal affairs,” the courts determine whether a topic is a municipal affair or whether it’s an issue of statewide concern. AB 660 says that it applies to all cities, including charter cities. To support this assertion, the bill includes a legislative finding and declaration that its provisions address a matter of statewide concern.
6. Related legislation. The Legislature is considering several measures that address the local plan check process, including the following:
- AB 253 (Ward), which the Committee will also hear at its July 2nd meeting, allows an applicant for small residential building permits to contract with or employ a private professional provider to check plans and specifications if specified time periods elapse.
- AB 671 (Wicks), which the Committee will also hear at its July 2nd meeting, requires a local building or permitting department to allow a qualified professional certifier to certify compliance with applicable building, health, and safety codes for a tenant improvement plan relating to a restaurant.
- AB 1276 (Carrillo), which has also been referred to the Committee, deems housing projects compliant with state and local standards if a reasonable person could find them in compliance, including post-entitlement phase permits.
- AB 1308 (Hoover), which the Committee will also hear at its July 2nd meeting, allows an applicant for small residential building projects, under specified conditions, to hire a private licensed professional to inspect permitted work for compliance with states housing laws and building codes.
7. Coming and going. The Senate Rules Committee has ordered a double referral of AB 660: first to the Committee on Local Government, which has jurisdiction over local permitting, and second to the Committee on Housing.
Assembly Actions
Assembly Local Government Committee: 10-0
Assembly Housing and Community Development Committee: 11-0
Assembly Appropriations Committee: 14-0
Assembly Floor: 76-0
Support and Opposition
(6/27/25)
Support: California Building Industry Association (Sponsor)
Abundant Housing LA
Associated General Contractors
Associated General Contractors of America, San Diego Chapter
Bay Area Council
Boma California
California Apartment Association
California Association of Realtors
California Builders Alliance
California Business Properties Association
California Housing Consortium
California Housing Partnership
California Retailers Association
California Yimby
Circulate San Diego
El Dorado County Chamber of Commerce
El Dorado Hills Chamber of Commerce
Elevate California
Elk Grove Chamber of Commerce
Folsom Chamber of Commerce
Housing Action Coalition
Housing California
Housing Leadership Council of San Mateo County
Housing Trust Silicon Valley
Inner City Law Center
Institute for Responsive Government Action
Leadingage California
Lieutenant Governor Eleni Kounalakis
Lincoln Area Chamber of Commerce
Midpen Housing
Naiop California
Rancho Cordova Chamber of Commerce
Rocklin Area Chamber of Commerce
Roseville Area Chamber of Commerce
Sacramento Regional Builders Exchange
Shingle Springs/cameron Park Chamber of Commerce
South Pasadena Residents for Responsible Growth
Southern California Leadership Council
Spur
United Chamber Advocacy Network
Yuba Sutter Chamber of Commerce
Opposition: City of Murrieta
City of Thousand Oaks
County of Santa Barbara
League of California Cities
-- END --
For example, “[a]city's findings that [a] project is consistent with its general plan can be reversed only if [they are] based on evidence from which no reasonable person could have reached the same conclusion.” (A Local & Regional Monitor v. City of Los Angeles (1993) 16 Cal.App.4th 630, 648, as cited by San Franciscans Upholding the Downtown Plan v. City & County of San Francisco (2002) 102 Cal.App.4th 656, 677). ↑
ASSEMBLY THIRD READING
ATR Bill Id:AB 660
Author:(Wilson)
As Amended Ver:April 24, 2025
Majority vote
SUMMARY
Makes a number of changes to law governing the approval and issuance of postentitlement phase permits.
Major Provisions
- Prohibits a local agency from requiring or requesting more than two plan check and specification reviews in connection with an application for a building permit for a housing development, unless the local agency's requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety.
- Removes a provision that allows postentitlement permit review timeframes to be tolled if a local agency requires review by an outside entity, as specified.
- Prohibits a local agency from requesting or requiring any action or inaction as a result of a building inspection undertaken to assess compliance with the applicable building standards that would represent a deviation from a previously approved plan or similar approval for a building permit, unless the requirement or request is accompanied by written findings based on substantial evidence in the record that both of the following apply:
- A reasonable person could not interpret the previously approved building plan or similar approval as being compliant with the applicable standards for the building permit.
- The deviation is necessary to address a specific, adverse impact on public health or safety.
- Makes the following changes to the process and requirements that apply if a postentitlement phase permit is determined to be incomplete or denied, or determined to be noncompliant:
- Removes the authority of a city or county to provide that the right of appeal is to the planning commission.
- Reduces the amount of time within which a local agency must provide a final written determination after receipt of an applicant's written appeal, as follows:
- With respect to a postentitlement phase permit concerning housing development projects with 25 units or fewer, a local agency shall provide a final written determination no later than 30 business days (instead of 60 business days) after receipt of the applicants written appeal.
- With respect to a postentitlement phase permit concerning housing development projects with 26 units or more, a local agency shall provide a final written determination no later than 45 business days (instead of 90 business days) after receipt of the applicant’'s written appeal.
- Allows the applicant to seek a writ of mandate to compel approval of the application if the applicant's appeal is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required. The writ of mandate shall be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
- Changes the definition of "postentitlement phase permit" to specify that building permits, and all interdepartmental review required for the issuance of a building permit, includes plan checking and building inspection.
- Specifies that the provisions of this bill apply to all cities, including charter cities.
COMMENTS
- Background. Planning for and entitling new housing is mainly a local responsibility. The California Constitution allows cities and counties to "make and enforce within its limits, all local, police, sanitary and other ordinances and regulations not in conflict with general laws.” It is from this fundamental power (commonly called the police power) that cities and counties derive their authority to regulate behavior to preserve the health, safety, and welfare of the public – including land use authority. Cities and counties enforce this land use authority through zoning regulations, such as the allowable density and height for a project, parking requirements, and setbacks. Cities and counties also enforce this land use authority through their control of the entitlement process, which is the process by which the city or county grants permission for a proposed housing development to be built.
Existing state laws, including the Permit Streamlining Act, the Housing Accountability Act, and the Housing Crisis Act of 2019, establish parameters for the entitlement process. These parameters are designed to ensure that public agencies act fairly and promptly on applications for housing development proposals. These laws require public agencies to compile lists of information that applicants must provide, and explain the criteria they will use to review permit applications. Once a developer has submitted a complete application for development, these laws require that the project be subject only to the ordinances, policies, and standards adopted and in effect at the time of the application, and require local officials to act within a specific time period after completing any environmental review documents required under the California Environmental Quality Act.
- Post-entitlement. A development proposal that is approved and entitled by a local agency must also obtain approval of objective permits associated with the development proposal. This ensures the proposal is compliant with state and local building codes and other measures that protect public health, safety and the environment. Post-entitlement phase permits include permits to prepare the site for new development, including demolition permits and grading permits. Post-entitlement phase permits also include all the building permits for the new construction. This stage of the review process is often ministerial, as these postentitlement permits are typically objective in nature.
Generally, once a local agency invests the time and effort to approve and entitle a development proposal, there is an incentive for the agency to process the postentitlement permits in a timely fashion.
AB 2234 (Robert Rivas), Chapter 651, Statutes of 2022, established parameters for a local agency’s review of non-discretionary post-entitlement phase permits, including requiring a local agency to determine whether an application for a post-entitlement building permit is complete within 15 days of the agency receiving the application. Post-entitlement building permits must be approved by local agencies within 30 days for small housing development projects and 60 days for large housing development projects. AB 2234 specified that its process and timeframes do not place limitations on the amount of feedback that a local agency may provide or revisions that a local agency may request of an applicant
AB 1114 (Haney), Chapter 753, Statutes of 2023, expanded the postentitlement permits subject to the expedited review process and timelines established by AB 2234 to include all building permits and other permits issued under the California Building Standards Code, or any applicable local building code for the construction, demolition, or alteration of buildings, whether discretionary or nondiscretionary.
According to the Author
While California has taken many steps to address the housing crisis, there is still much work to be done. AB 660 aims to build on AB 2234 by closing gaps in existing law regarding the timelines for local agencies to review applications and act on post-entitlement permits and applications.
The post-entitlement process has become a significant cog in the housing progress, delaying construction and advancement across the state. AB 660 aims to ensure that our housing projects are approved and built on time, avoiding delays during the plan check process that often derail housing development. This legislation ensures that the standards we put on our local agencies are truly binding by empowering developers to seek legal action when these agency ‘shot clocks’ are violated. AB 660 moves to continue the streamlining of housing production in California, removing unnecessary plan checks and assuring that our local agencies abide by established deadlines.
Arguments in Support
The California Building Industry Association, sponsor of this measure, writes, “California’s severe housing shortage and affordability crisis demand immediate action to streamline regulatory processes that hinder housing production. While prior legislation—such as AB 2234 (Rivas)—took significant steps in setting a framework for timely post entitlement permit approvals, AB 660 seeks to further bolster this process. Permit issuance delays increase development costs and hinder the timely delivery of much-needed housing for California families.
"AB 660 effectively builds upon the existing law by addressing critical shortcomings in the post entitlement permit process. Specifically, this bill:
- Prohibits last-minute field changes that deviate from previously approved plans, ensuring consistency and predictability in the construction process.
- Limits excessive plan check resubmittals, reducing unnecessary delays that increase project costs.
- Provides applicants with legal recourse when local agencies fail to comply with established timeframes, reinforcing accountability in the permitting process.
- Closes loopholes that allow indefinite extensions of the shot clock, ensuring timely and fair permit decisions.
"By promoting a more efficient, predictable, and fair permitting process, AB 660 is essential to ensuring that the housing projects California desperately needs can move forward without unnecessary bureaucratic delays."
Arguments in Opposition
The Santa Barbara County Board of Supervisors write, "AB 660 would limit the County to two rounds of plan check and specification reviews while reviewing a building permit for a housing development proposal, unless the local agency's requirement or request for additional review is accompanied by written findings based on substantial evidence additional review is necessary to address a specific, adverse impact on public health or safety. This requirement would preclude the County from requiring compliance with lawfully adopted codes and standards and compromise the quality of reviews.
"The County is also concerned that the expedited review timelines for appeals under the bill are not accompanied by additional financial resources for implementation. Specifically, AB 660 reduces the timeline for final action on appeals of post-entitlement permits from 60 days to 30 days for housing projects of up to 25 units and from 90 days to 45 days for projects of 25 or more housing units. These timeframes may not provide adequate time for review of issues that are subject to appeal."
FISCAL COMMENTS
- Costs of an unknown amount to local agencies to provide for the streamlining changes for application approvals and appeals of postentitlement phase permits. Costs to each local agency will depend on the number of applications and appeals received and subject to the new timelines. These costs are not state-reimbursable because local agencies have general authority to charge and adjust planning and permitting fees to offset increased costs associated with the provisions of this bill.
- Cost pressures (General Fund, Trial Court Trust Fund) of an unknown but potentially significant amount to the courts to the extent this bill creates a new civil action. Although courts are not funded on the basis of workload, increased pressure on the Trial Court Trust Fund may create a demand for increased funding for courts from the General Fund. The fiscal year 2024-25 state budget provides $37.3 million ongoing General Fund to backfill declining revenue to the Trial Court Trust Fund.
VOTES
ASM LOCAL GOVERNMENT: 10-0-0
YES: Carrillo, Ta, Hoover, Pacheco, Ramos, Ransom, Blanca Rubio, Stefani, Ward, Wilson
ASM HOUSING AND COMMUNITY DEVELOPMENT: 11-0-1
YES: Haney, Patterson, Ávila Farías, Caloza, Garcia, Kalra, Lee, Quirk-Silva, Ta, Wicks, Wilson
ABS, ABST OR NV: Tangipa
ASM APPROPRIATIONS: 14-0-1
YES: Wicks, Arambula, Calderon, Caloza, Dixon, Elhawary, Fong, Mark González, Hart, Pacheco, Pellerin, Solache, Ta, Tangipa
ABS, ABST OR NV: Sanchez
UPDATED
VERSION: April 24, 2025
CONSULTANT: Angela Mapp / L. GOV. / (916) 319-3958 FN: 0000527
Date of Hearing: May 14, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 660
Author:(Wilson) – As Amended Ver:April 24, 2025
Policy Committee: | Local Government | Vote: | 10 - 0 |
Housing and Community Development | 11 - 0 | ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill modifies the Planning and Zoning Law to streamline the post-entitlement permitting process for housing developments.
Specifically, this bill:
- Limits a local agency to two plan check and specification reviews while reviewing a building permit for a housing development proposal, unless the local agency’s requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific adverse impact on public health or safety.
- Deletes the provision allowing the postentitlement permit review timeframes to be tolled if a local agency requires review by an outside entity.
- Prohibits a local agency from requesting or requiring any action or inaction as a result of a building inspection that would represent a deviation from a previously approved plan or similar approval for the project, unless the requirement or request is accompanied by written findings based on substantial evidence in the record that meet a reasonable person standard and are necessary to address a specific adverse impact on public health or safety.
- If a postentitlement phase permit is determined to be incomplete or denied, or determined to be noncompliant, the bill:
- Removes the option of a city or county to provide that the right of appeal is to the planning commission.
- For a housing development project with 25 or fewer units, requires a local agency to provide a final written determination on an appeal no later than 30 business days (instead of 60 business days) after receipt of the applicant’s written appeal.
- For a housing development project with 26 or more units, requires a local agency to provide a final written determination on an appeal no later than 45 business days (instead of 90 business days) after receipt of the applicant’s written appeal.
- Allows the applicant to seek a writ of mandate to compel approval of the application, if the applicant’s appeal is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required. The writ of mandate must be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
FISCAL EFFECT:
- Costs of an unknown amount to local agencies to provide for the streamlining changes for application approvals and appeals of postentitlement phase permits. Costs to each local agency will depend on the number of applications and appeals received and subject to the new timelines. These costs are not state-reimbursable because local agencies have general authority to charge and adjust planning and permitting fees to offset increased costs associated with the provisions of this bill.
- Cost pressures (General Fund, Trial Court Trust Fund) of an unknown but potentially significant amount to the courts to the extent this bill creates a new civil action. Although courts are not funded on the basis of workload, increased pressure on the Trial Court Trust Fund may create a demand for increased funding for courts from the General Fund. The fiscal year 2024-25 state budget provides $37.3 million ongoing General Fund to backfill declining revenue to the Trial Court Trust Fund.
COMMENTS:
- Purpose. The author seeks to streamline the post-entitlement permitting process for housing developments. According to the author:
The post-entitlement process has become a significant cog in the housing progress, delaying construction and advancement across the state. [This bill] aims to ensure that our housing projects are approved and built on time, avoiding delays during the plan check process that often derail housing development. This legislation ensures that the standards we put on our local agencies are truly binding by empowering developers to seek legal action when these agency “shot clocks” are violated. [This bill] moves to continue the streamlining of housing production in California, removing unnecessary plan checks and assuring that our local agencies abide by established deadlines.
- Post-entitlement Permit Process. Once a housing project receives approval (“entitlement”) from the local planning department, the developer must obtain a range of nondiscretionary permits, referred to as post-entitlement permits, to complete the work to construct the building. These permits can include building permits and other permits for demolition; grading; excavation; electrical, plumbing, or mechanical work; encroachment in the public right-of-way; roofing; water and sewer connections, or septic systems; fire sprinklers; and home occupations. During the post-entitlement stage, housing project plans are reviewed by local agencies for consistency with state housing law, which provides requirements and procedures to protect the health, safety, and general welfare of the public and occupants of housing and accessory buildings. Agencies check the plans for consistency with the state building codes, fire codes, energy codes, and green building standards.
In an effort to address delays in the postentitlement permitting process, the Legislature passed AB 2234 (Rivas), Chapter 651, Statutes of 2022, which established clear timelines and review standards for local governments processing postentitlement phase permits. Despite the passage of AB 2234, developers cite continued delays, hurdles, and inconsistencies in the postentitlement permitting and inspection process. This bill seeks to address those concerns.
- Arguments in Support. A group of organizations, including the California Building Industry Association, sponsor of the bill, assert:
While prior legislation—such as AB 2234 (Rivas)—took significant steps in setting a framework for timely post entitlement permit approvals, [this bill] seeks to further bolster this process. Permit issuance delays increase development costs and hinder the timely delivery of much-needed housing for California families.
- Arguments in Opposition. The City of Murrieta asserts:
[This bill] would prohibit local agencies from requiring more than two plan checks and specification reviews for building permit applications. Additionally, it imposes an expedited review timeline. These restrictions could compromise the thoroughness of safety and compliance evaluations, increasing the risk of oversights in building standards and public safety. Furthermore, the compressed timelines could overburden local agencies, limiting their ability to conduct comprehensive reviews. Finally, the bill removes tolling provisions when external reviews by outside agencies are required, failing to account for the complexities and variances inherent in different projects. This change could lead to unrealistic deadlines that do not reflect the real-world challenges of housing development.
Analysis Prepared by: Jennifer Swenson / APPR. / (916) 319-2081
Date of Hearing: April 30, 2025
ASSEMBLY COMMITTEE ON HOUSING AND COMMUNITY DEVELOPMENT
Matt Haney, Chair
ABPCA Bill Id:AB 660 (
Author:Wilson) – As Amended Ver:April 24, 2025
SUBJECT: Planning and Zoning Law: postentitlement phase permits
SUMMARY: Makes numerous changes to the postentitlement permit review process. Specifically, this bill:
- Limits a local agency to two rounds of plan check and specification reviews while reviewing a building permit for a housing development proposal, unless the local agency’s requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety.
- Deletes the provision that would allow the timeframes that local agencies must comply with when reviewing postentitlement permits for housing development to be tolled if a local agency requires review by an outside entity.
- Prohibits a local agency from requesting or requiring any action or inaction as a result of a building inspection that would represent a deviation from a previously approved plan or similar approval for the project, unless the local agency’s requirement or request is accompanied by written findings based on substantial evidence in the record that both of the following apply:
- A reasonable person could not interpret the previously approved plan or similar approval as being compliant with the applicable standards; and
- The deviation is necessary to address a specific, adverse impact on public health or safety.
- Makes the following changes to the process and requirements that apply if a postentitlement phase permit is determined to be incomplete or denied, or determined to be noncompliant:
- Removes the authority of a city or county to provide that the right of appeal is to the Planning Commission;
- Reduces the amount of time within which a local agency must provide a final written determination after receipt of an applicant’s written appeal, as follows:
- With respect to a postentitlement phase permit concerning housing development projects with 25 units or fewer, a local agency shall provide a final written determination no later than 30 business days (instead of 60 business days) after receipt of the applicant’s written appeal; and
- With respect to a postentitlement phase permit concerning housing development projects with 26 units or more, a local agency shall provide a final written determination no later than 45 business days (instead of 90 business days) after receipt of the applicant’s written appeal.
- Allows the applicant to seek a writ of mandate to compel approval of the application if the applicant’s appeal is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required. The writ of mandate shall be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
- Adds plan checking and building inspection functions to the definition of “building permits” as it pertains to postentitlement phase permits.
- Makes a number of conforming, technical, and clarifying changes.
EXISTING LAW:
- Defines “postentitlement phase permit” as follows:
- All nondiscretionary permits required by a local agency after the entitlement process to begin construction of a development that is intended to be at least two-thirds residential, excluding specified planning permits, entitlements, and other permits. These permits include, but are not limited to, all of the following:
- Building permits, and all inter-departmental review required for the issuance of a building permit;
- Permits for minor or standard off-site improvements;
- Permits for demolition; and
- Permits for minor or standard excavation and grading.
- All building permits and other permits issued under the California Building Standards Code or any applicable local building code for the construction, demolition, or alteration of buildings, whether discretionary or nondiscretionary;
- Permits required and issued by the California Coastal Commission, a special district, or a utility that is not owned and operated by a local agency, or any other entity that is not a city or county, are excluded from the definition of “postentitlement phase permit.” [Government Code (GOV) 65913.3]
- All nondiscretionary permits required by a local agency after the entitlement process to begin construction of a development that is intended to be at least two-thirds residential, excluding specified planning permits, entitlements, and other permits. These permits include, but are not limited to, all of the following:
- Requires a local agency, defined to include a city or county, to compile one or more lists of information that will be required from any applicant for a postentitlement phase permit. (GOV 65913.3)
- Allows the local agency to revise the lists specified in (2), however, any revised list cannot apply to any permit pending review. (GOV 65913.3)
- Requires a local agency to post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least five types of housing development projects in the jurisdiction, as specified. Requires the lists and example permits to be posted on the city or county’s website by January 1, 2024. (GOV 65913.3)
- Requires a local agency to determine whether an application for a postentitlement phase permit is complete and provide written notice of this determination to the applicant within 15 business days after the local agency received the application, as follows:
- If the local agency determines an application is incomplete, the local agency must provide the applicant with a list of incomplete items and a description of how the application can be made complete, but the local agency can’t request new information that wasn’t on the original list of needed information;
- After receiving a notice that the application was incomplete, an applicant may cure and address the items that are deemed to be incomplete by the local agency. Upon receipt of a corrected application, the local agency must notify the applicant whether the additional application has remedied all incomplete items within 15 business days; and
- If a local agency does not meet the timelines required for determining an application complete, and the application or resubmitted application states that it is for a postentitlement phase permit, the application or resubmitted application shall be deemed complete. (GOV 65913.3)
- Specifies the process for approving postentitlement permits, as follows:
- Requires local agencies to complete review, either return in writing a full set of comments to the applicant with a comprehensive request for revisions or return the approved permit application, and electronically notify the applicant of its determination within:
- Thirty business days of the application being complete for housing development projects with 25 units or fewer; or
- Sixty business days of the application being complete for housing development projects with 26 units or more.
- Provides that these time limits do not apply if the local agency makes written findings within the applicable time limit that the proposed postentitlement phase permit might have a specific, adverse impact on public health or safety and that additional time is necessary to process the application;
- Tolls the time limits for approval if the local agency requires review of the application by an outside entity, as specified;
- If a local agency finds that a complete application is noncompliant, the local agency must provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within the applicable time limit, as provided, and must allow the applicant to correct the application; and
- Requires local agencies to establish an appeals process. If an applicant appeals, the local agency must make a final determination within:
- Sixty business days of the appeal for a project of 25 units or fewer; or
- Ninety business days of the appeal for a project of 26 units or more. (GOV 65913.3)
- Requires local agencies to complete review, either return in writing a full set of comments to the applicant with a comprehensive request for revisions or return the approved permit application, and electronically notify the applicant of its determination within:
- Provides that failure to meet the time limits in 6) constitute a violation of the Housing Accountability Act (HAA). (GOV 65913.3)
- Allows extension of any of the time limits upon mutual agreement by the local government and the applicant. However, a local agency cannot require as a condition of submitting the application that the applicant waive the time limits in this bill, with an exception for environmental review associated with the project. (GOV 65913.3)
- Specifies that the process and timeframes outlined above do not place limitations on the amount of feedback that a local agency may provide or revisions that a local agency may request of an applicant. (GOV 65913.3)
FISCAL EFFECT: Unknown.
COMMENTS:
Author’s Statement: According to the author, “While California has taken many steps to address the housing crisis, there is still much work to be done. AB 660 aims to build on AB 2234 by closing gaps in existing law regarding the timelines for local agencies to review applications and act on post-entitlement permits and applications. The post-entitlement process has become a significant cog in the housing progress, delaying construction and advancement across the state. AB 660 aims to ensure that our housing projects are approved and built on time, avoiding delays during the plan check process that often derail housing development. This legislation ensures that the standards we put on our local agencies are truly binding by empowering developers to seek legal action when these agency “shot clocks” are violated. AB 660 moves to continue the streamlining of housing production in California, removing unnecessary plan checks and assuring that our local agencies abide by established deadlines.”
California’s Housing Crisis: California’s housing crisis is a half-century in the making. [1] After decades of underproduction, supply is far behind need and housing and rental costs are soaring. As a result, millions of Californians must make hard decisions about paying for housing at the expense of food, health care, child care, and transportation, directly impacting the quality of life in the state. [2] One in three households in the state doesn’t earn enough money to meet their basic needs. [3] In 2024, over 187,000 Californians experienced homelessness on a given night.[4]
To meet this housing need, HCD determined that California must plan for more than 2.5 million new homes, and no less than one million of those homes must be affordable to lower-income households, in the 6th Regional Housing Needs Allocation (RHNA) cycle. By contrast, housing production in the past decade has been under 100,000 units per year – including less than 10,000 units of affordable housing per year.[5]
The state’s housing crisis is not equally experienced by all Californians. Testimony by the UC Berkeley Terner Center to this Committee showed that the impacts of the housing crisis are significantly more severe for lower-income individuals, single-earner households, Black and Latino Californians, younger and older populations, and those who reside in, or aspire to live and work in, the state’s highest-cost regions.[6]
Housing Approvals Process: Planning for, and approving, new housing developments is primarily a local responsibility. Under the California Constitution, cities and counties have broad authority, known as the police power, to regulate land use in the interest of public health, safety, and welfare. Local governments enforce this authority through an entitlement process, which includes both discretionary and ministerial approvals. Gaining “entitlement” is essentially a local government’s confirmation that a housing project conforms to all applicable local zoning regulations and design standards. For discretionary projects, environmental review under CEQA is often required as part of the entitlement process. CEQA can influence project design, add mitigation requirements, or delay approval if significant environmental impacts are identified.
Once a project receives entitlement, or approval, from the local planning department, it must obtain postentitlement permits, such as building, demolition, and grading permits. Postentitlement permits are related to the physical construction of the development proposal before construction can begin. At the postentitlement stage, plans are reviewed for consistency with State Housing Law, which provides requirements and procedures for uniform statewide code enforcement to protect the health, safety, and general welfare of the public and occupants of housing and accessory buildings. Among other things, State Housing Law delegates responsibility to state administrative agencies for the adoption of building standards, applies state building codes uniformly, and directs local agencies’ administration of code enforcement. During the postentitlement stage, development proposals are checked for consistency with the Building Code, Fire Code, Energy Code, and green building standards.
The process to gain approval to build new housing in California is often arduous, unpredictable, and expensive. A 2025 study found that California is the most expensive state for multifamily housing production, in part due to the long timeline it takes to go from an application to an approved project.[7] This report found that longer production timelines are strongly associated with higher costs, and the time to bring a project to completion in California is more than 22 months longer than the average time required in Texas.[8]
HCD identifies lengthy permit processing timelines and procedures as a governmental constraint to housing development. In HCD’s San Francisco Housing Policy and Practice Review, the department found that procedural complexities associated with housing entitlement and permitting are “not only a barrier to entry to new development professionals pursuing [housing] projects,” but they may also cause developers to exit housing markets with complex permitting ecosystems and pursue developments in neighboring jurisdictions with less complex procedural requirements instead.”[9] Bureaucratic hurdles and delays can result in project abandonment, further tightening the housing production pipeline.
2023 Housing Development Approvals Timeline[10]
Development Type | Average Days: Submitted to Entitled | Average Days: Entitled to Permitted | Average Days: Submitted to Approved |
Single Family (Detached) | 160 | 151 | 311 |
Single Family (Attached) | 221 | 93 | 314 |
Accessory Dwelling Unit (ADU) | 112 | 222 | 334 |
Mobile Home | 212 | 161 | 373 |
Two to Four Units | 179 | 345 | 524 |
Five or More Units | 323 | 377 | 700 |
This bill seeks to address postentitlement and construction delays for housing development proposals by imposing reasonable and clear limits on local agency processes during the permitting and inspection stages, as further described below.
AB 2234 (R. Rivas): In an effort to address delays in the postentitlement permitting process, in 2022, the Legislature passed AB 2234 (Rivas, Chapter 651) to establish clear timelines and review standards for local governments processing postentitlement phase permits, as follows:
- Deemed Complete Timeframe: Local governments must determine application completeness within 15 business days of receipt;
- Substantive Review Timeframe: Local governments must approve or deny postentitlement permits within 30-60 business days, depending on project size; and
- Revision and Appeal Process: Developers have a clear process to amend applications and appeal denials or incomplete determinations.
Furthermore, AB 2234 requires local governments to prepare lists specifying required application materials and post examples of approved permits. It also establishes strict timelines and procedures that must be followed to appeal decisions made on postentitlement permits. If a local government violates the timelines stipulated in AB 2234, it is considered a violation of the Housing Accountability Act (HAA). HCD has enforcement authority over the HAA, among other state housing laws. HCD initiates enforcement reviews based on various sources, including stakeholder complaints. If there is suspected violation of a housing law such as the HAA, the process typically begins with discussions with the local government for HCD to better understand the issue. If further action is needed, HCD may issue a letter of inquiry, technical assistance, or corrective action, usually allowing 30 days for a response. Depending on the outcome, HCD may acknowledge compliance, issue a violation notice, or revoke housing element certification. If the issue remains unresolved, HCD may escalate the matter to the California Attorney General, who may take legal action, including potentially imposing fines or other penalties.
Despite the passage of AB 2234, developers cite continued delays, hurdles, and inconsistencies in the postentitlement permitting and inspection process. This bill seeks to address many of those. First, this bill would prohibit local agency inspectors from requiring in-field changes that deviate from previously approved plans, unless they make written findings based on substantial evidence in the record that a reasonable person could not interpret the previously approved building plan or similar approval as being compliant with the applicable standards for the building permit, and that the changes are necessary for life/safety reasons. This would help to ensure that projects are not delayed by last-minute change requests. These adjustments, which local agencies often justify by saying certain requirements were missed during the plan check stage, can be quite costly and can impact both construction costs and project timelines. Second, this bill would limit the number of plan check or specification resubmittals that a local agency can require from applicants during the building permit review process, reducing redundant back-and-forth that can slow down timelines. This bill still maintains the ability for additional rounds of review if the local agency makes written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety.
Additionally, this bill strengthens enforcement of permit timelines by allowing applicants to seek a writ of mandate in court to compel the approval of an application if an applicant’s appeal of a postentitlement permit decision is not made within the statutory timelines, or if a local appeals process is not provided. If there is substantial evidence in the record to show that the application is complete and compliant, a court could compel the agency to issue the permit. This may help to address reported deficiencies in the current enforcement structure for postentitlement permits, which is a violation of the HAA. HAA violations require an often lengthy enforcement process involving HCD. This bill would provide developers with an alternate means of enforcing the law with regard to appeals. This bill also expedites the appeals process by cutting in half the time that a local government has to provide a written determination on the appeal, and by removing the role of the Planning Commission from the appeals process. Finally, this bill would prevent local agencies from indefinitely extending shot clocks if they outsource application reviews to third parties, ensuring that permitting timelines remain predictable and enforceable.
Arguments in Support: A group of organizations, including the California Building Industry Association (Sponsor), write in support: “While prior legislation—such as AB 2234 (Rivas)—took significant steps in setting a framework for timely post entitlement permit approvals, AB 660 seeks to further bolster this process. Permit issuance delays increase development costs and hinder the timely delivery of much-needed housing for California families.
AB 660 effectively builds upon the existing law by addressing critical shortcomings in the post entitlement permit process. By promoting a more efficient, predictable, and fair permitting process, AB 660 is essential to ensuring that the housing projects California desperately needs can move forward without unnecessary bureaucratic delays.”
Arguments in Opposition: The City of Murrieta writes in opposition: “AB 660 would prohibit local agencies from requiring more than two plan checks and specification reviews for building permit applications. Additionally, it imposes an expedited review timeline. These restrictions could compromise the thoroughness of safety and compliance evaluations, increasing the risk of oversights in building standards and public safety. Furthermore, the compressed timelines could overburden local agencies, limiting their ability to conduct comprehensive reviews. Finally, the bill removes tolling provisions when external reviews by outside agencies are required, failing to account for the complexities and variances inherent in different projects. This change could lead to unrealistic deadlines that do not reflect the real-world challenges of housing development.”
Related Legislation:
AB 253 (Ward) of this legislative session allows an applicant for specified residential building permits to contract with or employ a private professional provider to check plans and specifications if the county or city building department estimates a timeframe for this plan-checking function that exceeds 30 days, or does not complete this plan-checking function within 30 days. AB 253 is pending in the Senate Committee on Local Government.
AB 1308 (Hoover) of this legislative session allows an applicant for specified residential building permits to contract with or employ a private professional provider to perform inspections if the county or city building department estimates a timeframe for this function that exceeds 30 days, or does not complete this function within 30 days. AB 1308 passed out of the Committee on Local Government with a 10-0 vote and is pending in this Committee.
AB 1007 (Blanca Rubio) of this legislative session expedites timelines for approval or disapproval by a public agency acting as the “responsible agency” for residential and mixed-use development projects. AB 1007 passed out of the Committee on Local Government with a 10-0 vote and is pending in this Committee.
AB 1114 (Haney), Chapter 753, Statutes of 2023, expanded the scope of postentitlement phase permits subject to mandated processing timelines and other requirements to include discretionary permits. This bill functionally only applies to the City and County of San Francisco.
AB 2234 (Robert Rivas), Chapter 651, Statutes of 2022, required local agencies to process postentitlement permits within 30 days for small housing development projects and 60 days for large housing development projects.
Double-Referred: This bill was also referred to the Committee on Local Government, and passed on a vote of 10-0 on April 23, 2025.
REGISTERED SUPPORT / OPPOSITION:
Support
California Building Industry Association (Sponsor)
Abundant Housing LA
Associated General Contractors
Associated General Contractors-San Diego Chapter
BOMA California
California Apartment Association
California Association of Realtors
California Builders Alliance
California Business Properties Association
California Business Roundtable
California Retailers Association
California YIMBY
Circulate San Diego
El Dorado County Chamber of Commerce
El Dorado Hills Chamber of Commerce
Elevate California
Elk Grove Chamber of Commerce
Folsom Chamber of Commerce
Housing Action Coalition
Housing California
Housing Trust Silicon Valley
Institute for Responsive Government Action
LeadingAge California
Lincoln Area Chamber of Commerce
MidPen Housing
NAIOP California
Rancho Cordova Chamber of Commerce
Rocklin Area Chamber of Commerce
Roseville Area Chamber of Commerce
Sacramento Regional Builders Exchange
Shingle Springs/Cameron Park Chamber of Commerce
South Pasadena Residents for Responsible Growth
Southern California Leadership Council
SPUR
United Chamber Advocacy Network
Yuba Sutter Chamber of Commerce
Opposition
City of Murrieta (as of 4/10/25)
Analysis Prepared by: Dori Ganetsos / H. & C.D. / (916) 319-2085
California Department of Housing and Community Development, A Home for Every Californian: 2022 Statewide Housing Plan. March 2022, https://storymaps.arcgis.com/stories/94729ab1648d43b1811c1698a748c136 ↑
IBID. ↑
IBID. ↑
U.S. Department of Housing and Urban Development, Point in Time Counts. https://www.huduser.gov/portal/datasets/ahar/2023-ahar-part-1-pit-estimates-of-homelessness-in-the-us.html ↑
https://www.hcd.ca.gov/policy-research/housing-challenges.shtml ↑
UC Berkeley Terner Center Testimony by Ben Metcalf, Managing Director, at the State Housing Production Legislation: Actions, Outcomes, and Opportunities Informational Hearing, February 12, 2025 ↑
https://www.rand.org/pubs/research_reports/RRA3743-1.html ↑
https://www.rand.org/pubs/research_reports/RRA3743-1.html ↑
HCD San Francisco Policy & Practice Review, Page 13. Published October 2023. Accessed from: https://www.hcd.ca.gov/policy-and-research/plans-and-reports ↑
Based on self-reported Annual Progress Report (APR) data provided by local governments to HCD for housing developments approved the year 2023. These timelines includes time where the applicant was responsible for responding to feedback or any corrections identified by the local government, so they are not entirely representative of the length of time that a local government spent reviewing any given development. https://www.hcd.ca.gov/planning-and-community-development/housing-element-implementation-and-apr-dashboard ↑
Date of Hearing: April 23, 2025
ASSEMBLY COMMITTEE ON LOCAL GOVERNMENT
Juan Carrillo, Chair
ABPCA Bill Id:AB 660 (
Author:Wilson) – As Amended Ver:April 9, 2025
SUBJECT: Planning and Zoning Law: postentitlement phase permits.
SUMMARY: Makes a number of changes to law governing the approval and issuance of postentitlement phase permits and the provision of services for housing development projects by counties, cities and special districts. Specifically, this bill:
- Prohibits, as part of its review of a housing project, a local agency from requiring or requesting more than two plan check and specification reviews in connection with an application for a building permit, unless the local agency’s requirement or request for additional review is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety.
- Removes a provision specifying that, if the local agency requires review of the application by an outside entity, the time limits in existing law that would otherwise apply shall be tolled until the outside entity completes the review and returns the application to the local agency, at which point the local agency shall complete the review within the time remaining under the time limit, provided that the local agency notifies the applicant within three business days by electronic mail and, if applicable, by posting the notification on its internet website of the tolling and resumption of the time limit, as specified.
- Prohibits a local agency from requesting or requiring any action or inaction as a result of a site inspection that would represent a deviation from a previously approved plan or similar approval for the project, unless the local agency’s requirement or request is accompanied by written findings based on substantial evidence in the record that both of the following apply:
- A reasonable person could not interpret the previously approved plan or similar approval as being compliant with the applicable standards.
- The deviation is necessary to address a specific, adverse impact on public health or safety.
- Makes the following changes to the process and requirements that apply if a postentitlement phase permit is determined to be incomplete or denied, or determined to be noncompliant:
- Removes the authority of a city or county to provide that the right of appeal is to the planning commission.
- Reduces the amount of time within which a local agency must provide a final written determination after receipt of an applicant’s written appeal, as follows:
- With respect to a postentitlement phase permit concerning housing development projects with 25 units or fewer, a local agency shall provide a final written determination no later than 30 business days (instead of 60 business days) after receipt of the applicant’s written appeal.
- With respect to a postentitlement phase permit concerning housing development projects with 26 units or more, a local agency shall provide a final written determination no later than 45 business days (instead of 90 business days) after receipt of the applicant’s written appeal.
- Allows the applicant to seek a writ of mandate to compel approval of the application if the applicant’s appeal is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required. The writ of mandate shall be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
- Changes the definition of “postentitlement phase permit” to specify that building permits, and all interdepartmental review required for the issuance of a building permit, includes plan checking and site inspection.
- Makes the following changes to law governing applications from a housing project for service from a special district, or for a postentitlement phase permit that a local agency deemed complete that requires separate approval from a special district:
- Allows, following receipt by an applicant of a specified notice from a special district of information or next steps required in the review process, the applicant to provide a written response to the special district notifying the special district that the applicant believes that it has submitted all of the legally required information for the application to be considered and that the application is compliant with the applicable standards for approval of the application.
- Allows, if the special district does not approve the application within 30 days of receiving the notice, the applicant to seek a writ of mandate to compel approval of the application. The writ of mandate shall be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
- Provides that the provisions in 3) and 5), above, does not constitute a change in, but is declaratory of, existing law.
- Makes a number of conforming, technical and clarifying changes.
- Finds and declares that this bill addresses a matter of statewide concern rather than a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, this bill applies to all cities, including charter cities.
- Provides that no reimbursement is required by this bill pursuant to Section 6 of Article XIII B of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this bill, as specified.
EXISTING LAW:
- Defines “postentitlement phase permit” as follows:
- All nondiscretionary permits required by a local agency after the entitlement process to begin construction of a development that is intended to be at least two-thirds residential, excluding specified planning permits, entitlements, and other permits. These permits include, but are not limited to, all of the following:
- Building permits, and all inter-departmental review required for the issuance of a building permit.
- Permits for minor or standard off-site improvements.
- Permits for demolition.
- Permits for minor or standard excavation and grading.
- All building permits and other permits issued under the California Building Standards Code or any applicable local building code for the construction, demolition, or alteration of buildings, whether discretionary or nondiscretionary.
- Allows a local agency to identify by ordinance a threshold for determining whether a permit constitutes a “minor” or “standard” permit if supported by written findings.
- Excludes a permit required and issued by the California Coastal Commission, a special district, or a utility that is not owned and operated by a local agency, or any other entity that is not a city or county. [Government Code (GOV) § 65913.3]
- All nondiscretionary permits required by a local agency after the entitlement process to begin construction of a development that is intended to be at least two-thirds residential, excluding specified planning permits, entitlements, and other permits. These permits include, but are not limited to, all of the following:
- Requires a local agency, defined to include a city or county, to compile one or more lists of information that will be required from any applicant for a postentitlement phase permit. (GOV § 65913.3)
- Allows the local agency to revise the lists specified in (2), however, any revised list cannot apply to any permit pending review. (GOV § 65913.3)
- Requires a local agency to post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least five types of housing development projects in the jurisdiction, as specified. Requires the lists and example permits to be posted on the city or county’s website by January 1, 2024. (GOV § 65913.3)
- Requires a local agency to determine whether an application for a postentitlement phase permit is complete and provide written notice of this determination to the applicant within 15 business days after the local agency received the application, as follows:
- If the local agency determines an application is incomplete, the local agency must provide the applicant with a list of incomplete items and a description of how the application can be made complete, but the local agency can’t request new information that wasn’t on the original list of needed information.
- After receiving a notice that the application was incomplete, an applicant may cure and address the items that are deemed to be incomplete by the local agency. Upon receipt of a corrected application, the local agency must notify the applicant whether the additional application has remedied all incomplete items within 15 business days.
- If a local agency does not meet the timelines required for determining an application complete, and the application or resubmitted application states that it is for a postentitlement phase permit, the application or resubmitted application shall be deemed complete. (GOV § 65913.3)
- Specifies the process for approving postentitlement permits, as follows:
- Requires local agencies to complete review, either return in writing a full set of comments to the applicant with a comprehensive request for revisions or return the approved permit application, and electronically notify the applicant of its determination within:
- Thirty business days of the application being complete for housing development projects with 25 units or fewer.
- Sixty business days of the application being complete for housing development projects with 26 units or more.
- Provides that these time limits do not apply if the local agency makes written findings within the applicable time limit that the proposed postentitlement phase permit might have a specific, adverse impact on public health or safety and that additional time is necessary to process the application.
- Tolls the time limits for approval if the local agency requires review of the application by an outside entity, as specified.
- If a local agency finds that a complete application is noncompliant, the local agency must provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within the applicable time limit, as provided, and must allow the applicant to correct the application.
- Requires local agencies to establish an appeals process. If an applicant appeals, the local agency must make a final determination within:
- Sixty business days of the appeal for a project of 25 units or fewer.
- Ninety business days of the appeal for a project of 26 units or more. (GOV § 65913.3)
- Requires local agencies to complete review, either return in writing a full set of comments to the applicant with a comprehensive request for revisions or return the approved permit application, and electronically notify the applicant of its determination within:
- Provides that failure to meet the time limits in this bill constitute a violation of the Housing Accountability Act (HAA). (GOV § 65913.3)
- Allows extension of any of the time limits upon mutual agreement by the local government and the applicant. However, a local agency cannot require as a condition of submitting the application that the applicant waive the time limits in this bill, with an exception for environmental review associated with the project. (GOV § 65913.3)
- Specifies that the process and timeframes outlined above do not place limitations on the amount of feedback that a local agency may provide or revisions that a local agency may request of an applicant. (GOV § 65913.3)
FISCAL EFFECT: This bill is keyed fiscal and contains a state-mandated local program.
COMMENTS:
- Author’s Statement. According to the author, “While California has taken many steps to address the housing crisis, there is still much work to be done. AB 660 aims to build on AB 2234 by closing gaps in existing law regarding the timelines for local agencies to review applications and act on post-entitlement permits and applications.
“The post-entitlement process has become a significant cog in the housing progress, delaying construction and advancement across the state. AB 660 aims to ensure that our housing projects are approved and built on time, avoiding delays during the plan check process that often derail housing development. This legislation ensures that the standards we put on our local agencies are truly binding by empowering developers to seek legal action when these agency ‘shot clocks’ are violated. AB 660 moves to continue the streamlining of housing production in California, removing unnecessary plan checks and assuring that our local agencies abide by established deadlines.”
- Background. Planning for and entitling new housing is mainly a local responsibility. The California Constitution allows cities and counties to “make and enforce within its limits, all local, police, sanitary and other ordinances and regulations not in conflict with general laws.” It is from this fundamental power (commonly called the police power) that cities and counties derive their authority to regulate behavior to preserve the health, safety, and welfare of the public – including land use authority. Cities and counties enforce this land use authority through zoning regulations, such as the allowable density and height for a project, parking requirements, and setbacks. Cities and counties also enforce this land use authority through their control of the entitlement process, which is the process by which the city or county grants permission for a proposed housing development to be built.
Existing state laws, including the Permit Streamlining Act, the Housing Accountability Act, and the Housing Crisis Act of 2019, establish parameters for the entitlement process. These parameters are designed to ensure that public agencies act fairly and promptly on applications for housing development proposals. These laws require public agencies to compile lists of information that applicants must provide, and explain the criteria they will use to review permit applications. Once a developer has submitted a complete application for development, these laws require that the project be subject only to the ordinances, policies, and standards adopted and in effect at the time of the application, and require local officials to act within a specific time period after completing any environmental review documents required under the California Environmental Quality Act.
- Post-entitlement. A development proposal that is approved and entitled by a local agency must also obtain approval of objective permits associated with the development proposal. This ensures the proposal is compliant with state and local building codes and other measures that protect public health, safety and the environment. Post-entitlement phase permits include permits to prepare the site for new development, including demolition permits and grading permits. Post-entitlement phase permits also include all the building permits for the new construction. This stage of the review process is often ministerial, as these postentitlement permits are typically objective in nature.
Generally, once a local agency invests the time and effort to approve and entitle a development proposal, there is an incentive for the agency to process the postentitlement permits in a timely fashion.
AB 2234 (Robert Rivas), Chapter 651, Statutes of 2022, established parameters for a local agency’s review of non-discretionary post-entitlement phase permits, including requiring a local agency to determine whether an application for a post-entitlement building permit is complete within 15 days of the agency receiving the application. Post-entitlement building permits must be approved by local agencies within 30 days for small housing development projects and 60 days for large housing development projects. AB 2234 specified that its process and timeframes do not place limitations on the amount of feedback that a local agency may provide or revisions that a local agency may request of an applicant
AB 1114 (Haney), Chapter 753, Statutes of 2023, expanded the postentitlement permits subject to the expedited review process and timelines established by AB 2234 to include all building permits and other permits issued under the California Building Standards Code, or any applicable local building code for the construction, demolition, or alteration of buildings, whether discretionary or nondiscretionary.
- Special District Approvals. Special districts are limited purpose local governments, separate from cities and counties. Within their boundaries, special districts provide focused public services such as fire protection, sewers, water supply, electricity, parks, recreation, sanitation, cemeteries, and libraries. In addition to receiving approval of permits, housing projects may also need to receive approval for services provided by special districts, such as power and water.
AB 281 (Grayson and Robert Rivas), Chapter 735, Statutes of 2023, also built on the provisions of AB 2234 by requiring special districts to alter their process and timelines regarding applications from a housing development project for service, or for a postentitlement permit that another local agency deemed complete that also requires separate approval from the special district.
AB 281 required special districts to respond in writing to the following inquiries when they receive an application from a housing development for service or a postentitlement permit requiring separate approval from the special district:
- Within 30 business days for a housing development project with 25 units or fewer; or
- Within 60 business days for a housing development project with 26 units or more.
The written notice must include the next steps in the review process, including any information required to begin or continue the review process. After receiving notice that an application requires additional information, an applicant may provide the requested information directly to the special district. A special district must continue to review each submission to determine additional relevant information, and provide written notice of the next steps or additional information required within those timeframes.
AB 281 did not require the special district to approve the application or serve the housing development project within a specified time. The bill also specifically provided that it does not limit the amount of comments, feedback, revisions, or requests for additional information a special district may provide to an applicant or to a local agency.
- Bill Summary. This bill makes changes to the postentitlement permitting and approvals process for housing development projects for counties and cities, and for special districts.
This bill makes the following changes that apply to counties and cities, including charter cities:
- Plan Checks. This bill prohibits a local agency from requiring or requesting more than two plan check and specification reviews in connection with an application for a building permit for a housing development project, unless the local agency’s requirement or request is accompanied by written findings based on substantial evidence in the record that the additional review is necessary to address a specific, adverse impact on public health or safety. This provision applies regardless of the size of the housing project.
- Tolling. Under existing law, if a local agency requires review of an application by an outside entity (such as a special district), the time limits that would otherwise apply to the local agency are “tolled” (or suspended) until the outside entity completes its review and returns the application to the local agency. At this point, the local agency must complete its review with the remaining time limit. This bill removes this tolling period, effectively running the clock on the local agency’s time limit while an outside agency (or agencies) complete their work.
- Site Inspections. This bill also prohibits a local agency from requesting or requiring any action or inaction as a result of a site inspection that deviates from a previously approved plan or similar approval for the project, unless the local agency’s requirement or request is accompanied by written findings based on substantial evidence in the record that both of the following apply:
- A reasonable person could not interpret the previously approved plan or similar approval as being compliant with the applicable standards.
- The deviation is necessary to address a specific, adverse impact on public health or safety.
- Appeals Process. If a postentitlement phase permit is determined to be incomplete or denied, or determined to be noncompliant, this bill makes the following changes to the appeals process:
- Eliminates the ability of a city or county to run the appeals process through its planning commission.
- Reduces the amount of time within which a local agency must provide a final written determination after receiving an applicant’s written appeal, as follows:
- For a postentitlement permit for housing development projects of 25 units or less, the local agency must provide a final written determination within 30 business days (instead of 60 business days) after receiving the applicant’s written appeal.
- For a postentitlement permit for housing development projects with 26 units or more, the local agency must provide a final written determination within 45 business days (instead of 90 business days) after receipt of the applicant’s written appeal.
- Allows an applicant to seek a writ of mandate to compel approval of an application if the applicant’s appeal is denied, or a decision on the appeal is not made within the timelines provided, or an appeals process is not provided as required. This bill requires the writ of mandate to be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
- Definitions. This bill changes the definition of “postentitlement phase permit” to specify that building permits, and all interdepartmental review required for the issuance of a building permit, includes plan checking and site inspection.
This bill makes the following changes to law governing applications from a housing project for service from a special district, or for a postentitlement phase permit that a local agency deemed complete that requires separate approval from a special district:
- If a special district provides notice to an applicant of the information or next steps required in the review process, this bill allows the applicant to provide a written response to the special district notifying the district that the applicant believes that it has submitted all of the legally required information for the application to be considered and that the application is compliant with the applicable standards for approval of the application.
- If the special district does not approve the application within 30 days of receiving this notice, this bill allows the applicant to seek a writ of mandate to compel approval of the application. This bill requires the writ of mandate to be granted if there is substantial evidence in the record that a reasonable person could find that the application is complete and compliant with the applicable standards.
This bill is sponsored by the California Building Industry Association.
- Policy Considerations. The Committee may wish to consider the following:
- Too Soon? This bill changes provisions of law that apply to special districts that were carefully negotiated and enacted less than two years ago. The Committee may wish to consider if it is premature to make changes to this area of law, or if more time should be allowed to fully evaluate its effect (and effectiveness) before additional changes are made.
- Site Inspections. This bill prohibits a local agency from requesting or requiring any action or inaction as a result of a site inspection that deviates from a previously approved plan or similar approval for the project, unless the local agency’s requirement or request is accompanied by findings that the deviation is necessary to address a specific, adverse impact on public health or safety. In some cases, plans and specifications will not account for unanticipated conditions that are found on a site during construction that might not be evident to inspectors until the inspection process and that could encompass conditions that don’t constitute a health or safety issue. The Committee may wish to consider if this language should be narrowed to apply only to inspections of a building, rather than an entire site.
- Definition. This bill changes the definition of “postentitlement phase permit” to specify that building permits, and all interdepartmental review required for the issuance of a building permit, includes plan checking and site inspection. The Committee may wish to consider if an entire site inspection should be considered a permit, or if this language should be narrowed to specify building inspection.
- Committee Amendments. The Committee may wish to consider the following amendments to address the policy considerations raised above:
- Amend Section 65913.3(d) as follows:
(5) The local agency shall not request or require any action or inaction as a result of a site building inspection undertaken to assess compliance with the applicable building permit standards that would represent a deviation from a previously approved building plan or similar approval for the project building permit, unless the local agency’s requirement or request is accompanied by written findings based on substantial evidence in the record that both of the following apply:
(A) A reasonable person could not interpret the previously approved building plan or similar approval as being compliant with the applicable standards for the building permit.
(B) The deviation is necessary to address a specific, adverse impact on public health or safety.
- Amend Section 65913.3.(j) as follows:
(3) (A) “Postentitlement phase permit” includes both of the following:
(i) All nondiscretionary permits and reviews that are required or issued by the local agency after the entitlement process has been completed to begin construction of a development that is intended to be at least two-thirds residential, excluding discretionary and ministerial planning permits, entitlements, and other permits and reviews that are covered under Chapter 4.5 (commencing with Section 65920). A postentitlement phase permit includes, but is not limited to, all of the following:
(I) Building permits, and all interdepartmental review required for the issuance of a building permit, including plan checking and site building inspection.
(II) Permits for minor or standard off-site improvements.
(III) Permits for demolition.
(IV) Permits for minor or standard excavation and grading.
(ii) All building permits and other permits issued under the California Building Standards Code (Title 24 of the California Code of Regulations) or any applicable local building code for the construction, demolition, or alteration of buildings, whether discretionary or nondiscretionary.
(B) A local agency may identify by ordinance a threshold for determining whether a permit constitutes a “minor” or “standard” permit for the purposes of this paragraph, which shall be supported by written findings adopted by the jurisdiction.
(C) A postentitlement phase permit does not include a permit required and issued by the California Coastal Commission, a special district, a utility that is not owned and operated by a local agency, or any other entity that is not a city, county, or city and county.
- Strike Section 2 of the bill.
- Related Legislation. AB 253 allows an applicant for specified residential building permits to contract with or employ a private professional provider to check plans and specifications if the county or city building department estimates a timeframe for this plan-checking function that exceeds 30 days, or does not complete this plan-checking function within 30 days. AB 253 is pending in the Senate.
AB 1308 (Hoover) allows an applicant for specified residential building permits to contract with or employ a private professional provider to perform inspections if the county or city building department estimates a timeframe for this function that exceeds 30 days, or does not complete this function within 30 days. AB 1308 is pending in this committee.
AB 1007 (Blanca Rubio) expedites timelines for approval or disapproval by a public agency acting as the “responsible agency” for residential and mixed-use development projects. AB 1007 is pending in the Assembly Housing and Community Development Committee.
- Previous Legislation. AB 2433 (Quirk-Silva) of 2024 would have required a local agency that has not completed plan-checking services within 30 business days of receiving a completed application for a building permit to complete plan-checking services and issue or deny a building permit within specified time frames, upon request by the applicant for the building permit. AB 2433 was held in Senate Local Government Committee.
AB 3012 (Grayson), Chapter 752, Statutes of 2024, required cities and counties to make available on their internet websites a fee estimate tool that the public can use to calculate an estimate of fees and exactions for a proposed housing development, and required the Department of Housing and Community Development to create a fee schedule template and a list of best practices, as specified.
AB 281 (Grayson and Robert Rivas), Chapter 735, Statutes of 2023, required special districts to comply with specified timeframes, similar to those for cities and counties, when reviewing and approving postentitlement phase permit applications from housing developers.
AB 1114 (Haney), Chapter 753, Statutes of 2023, expanded the scope of postentitlement phase permits subject to mandated processing timelines and other requirements to include discretionary permits.
AB 2234 (Robert Rivas), Chapter 651, Statutes of 2022, required local agencies to process non-discretionary permits within 30 days for small housing development projects and 60 days for large housing development projects.
- Arguments in Support. The California Building Industry Association, sponsor of this measure, writes, “California’s severe housing shortage and affordability crisis demand immediate action to streamline regulatory processes that hinder housing production. While prior legislation—such as AB 2234 (Rivas)—took significant steps in setting a framework for timely post entitlement permit approvals, AB 660 seeks to further bolster this process. Permit issuance delays increase development costs and hinder the timely delivery of much-needed housing for California families.
“AB 660 effectively builds upon the existing law by addressing critical shortcomings in the post entitlement permit process. Specifically, this bill:
- Prohibits last-minute field changes that deviate from previously approved plans, ensuring consistency and predictability in the construction process.
- Limits excessive plan check resubmittals, reducing unnecessary delays that increase project costs.
- Provides applicants with legal recourse when local agencies fail to comply with established timeframes, reinforcing accountability in the permitting process.
- Closes loopholes that allow indefinite extensions of the shot clock, ensuring timely and fair permit decisions.
“By promoting a more efficient, predictable, and fair permitting process, AB 660 is essential to ensuring that the housing projects California desperately needs can move forward without unnecessary bureaucratic delays.”
- Arguments in Opposition. The California Special Districts Association and the California Association of Sanitation Agencies, opposed unless amended, write, “AB 660, among other things, would amend California Government Code § 65913.3.1, a section that went into effect on January 1, 2024, after a collaborative process with local government organizations. This measure would add into the dialogue between proponents and special districts about approvals of projects related to providing services, an applicant’s authority to unilaterally notify a special district that the applicant believes they have submitted all the legally required information related to approval of an application. Furthermore, this bill would authorize an applicant to seek a writ of mandate if the application is not approved within 30 days of that notification.
“While this code section has been in effect for just over one year, the need to amend it so soon and in the spirit of the collaboratively derived language which recognized the importance of “…comments, feedback, revisions, or requests for additional information a special district …” is unclear. We find that this narrows and limits the recently chaptered provisions in Government Code § 65913.3.1 that recognize the realities of the on-the-ground process and service delivery. We find that these provisions specific to special districts are not yet ripe for revision.
“For the reasons mentioned above, we must respectfully oppose AB 660, unless amended to address the above concerns.”
- Double-Referral. This bill is double-referred to the Assembly Housing and Community Development Committee.
REGISTERED SUPPORT / OPPOSITION:
Support
California Building Industry Association [SPONSOR]
Abundant Housing LA
Associated General Contractors
Associated General Contractors-san Diego Chapter
Boma California
California Association of Realtors
California Business Properties Association
California Retailers Associaiton
California Yimby
Circulate San Diego
Housing Action Coalition
Housing California
Housing Trust Silicon Valley
Institute for Responsive Government Action
Leadingage California
Naiop California
South Pasadena Residents for Responsible Growth
Southern California Leadership Council
Spur
Opposition
California Association of Sanitation Agencies (unless amended)
California Special Districts Association (unless amended)
City of Murrieta
Analysis Prepared by: Angela Mapp / L. GOV. / (916) 319-3958
Discussed in Hearing
Senate Standing Committee on Appropriations
Senate Standing Committee on Local Government
Assembly Floor
Assembly Standing Committee on Housing and Community Development
Assembly Standing Committee on Local Government
Bill Author
Bill Co-Author(s):