SB 1085: Water supply planning: housing developments.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2026-09-30
Current Status:
Passed
(2026-09-30: Chaptered by Secretary of State. Chapter 1004, Statutes of 2026.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to be responsible for determining whether a project is exempt from CEQA and whether an environmental impact report, a negative declaration, or a mitigated negative declaration is required. Existing law requires a city or county that determines a certain type of project is subject to the requirements of CEQA to identify any public water system that may supply water for the project and to request those public water systems to prepare a specified water supply assessment, as provided.
This bill, among other things, would instead require a city or county, upon receipt of a preliminary application for a housing development project that meets certain conditions, or upon a development application for certain projects being determined as complete or deemed complete, to make that identification of public water systems. The bill would require a city or county, within 15 days of receiving an application that meets either of the above-mentioned criteria, to request each identified public water system to determine whether the projected water demand associated with the proposed project was included in the most recently adopted urban water management plan. By imposing additional duties on a city or county, the bill would impose a state-mandated local program.
Existing law requires the governing body of each identified public water system to submit the requested water supply assessment not later than 90 days from the date that the request was received. Existing law requires that the assessment be approved at a regular or special meeting, as provided.
This bill would require, for certain housing development projects, a public water system to submit the requested water supply assessment to the city or county no later than 45 days from the date that the request was received. The bill would provide that those water supply assessments do not need to be approved at a public meeting. The bill would also authorize a city or county to seek a writ of mandamus to compel a public water system that fails to submit the water supply assessment to comply with the requirements relating to the submission of the water supply assessment.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to be responsible for determining whether a project is exempt from CEQA and whether an environmental impact report, a negative declaration, or a mitigated negative declaration is required. Existing law requires a city or county that determines a certain type of project is subject to the requirements of CEQA to identify any public water system that may supply water for the project and to request those public water systems to prepare a specified water supply assessment, as provided.
This bill, among other things, would instead require a city or county, upon receipt of a preliminary application for a housing development project that meets certain conditions, or upon a development application for certain projects being determined as complete or deemed complete, to make that identification of public water systems. The bill would require a city or county, within 15 days of receiving an application that meets either of the above-mentioned criteria, to request each identified public water system to determine whether the projected water demand associated with the proposed project was included in the most recently adopted urban water management plan. By imposing additional duties on a city or county, the bill would impose a state-mandated local program.
Existing law requires the governing body of each identified public water system to submit the requested water supply assessment not later than 90 days from the date that the request was received. Existing law requires that the assessment be approved at a regular or special meeting, as provided.
This bill would require, for certain housing development projects, a public water system to submit the requested water supply assessment to the city or county no later than 45 days from the date that the request was received. The bill would provide that those water supply assessments do not need to be approved at a public meeting. The bill would also authorize a city or county to seek a writ of mandamus to compel a public water system that fails to submit the water supply assessment to comply with the requirements relating to the submission of the water supply assessment.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to be responsible for determining whether a project is exempt from CEQA and whether an environmental impact report, a negative declaration, or a mitigated negative declaration is required. Existing law requires a city or county that determines a certain type of project is subject to the requirements of CEQA to identify any public water system that may supply water for the project and to request those public water systems to prepare a specified water supply assessment, as provided.
This bill, among other things, would instead require a city or county, upon receipt of a preliminary application for a housing development project that meets certain conditions, or upon a development application for certain projects being determined as complete or deemed complete, to make that identification of public water systems. The bill would require a city or county, within 15 days of receiving an application that meets either of the above-mentioned criteria, to request each identified public water system to determine whether the projected water demand associated with the proposed project was included in the most recently adopted urban water management plan. By imposing additional duties on a city or county, the bill would impose a state-mandated local program.
Existing law requires the governing body of each identified public water system to submit the requested water supply assessment not later than 90 days from the date that the request was received. Existing law requires that the assessment be approved at a regular or special meeting, as provided.
This bill would require, for certain housing development projects, a public water system to submit the requested water supply assessment to the city or county no later than 45 days from the date that the request was received. The bill would provide that those water supply assessments do not need to be approved at a public meeting. The bill would also authorize a city or county to seek a writ of mandamus to compel a public water system that fails to submit the water supply assessment to comply with the requirements relating to the submission of the water supply assessment.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to be responsible for determining whether a project is exempt from CEQA and whether an environmental impact report, a negative declaration, or a mitigated negative declaration is required. Existing law requires a city or county that determines a certain type of project is subject to the requirements of CEQA to identify any public water system that may supply water for the project and to request those public water systems to prepare a specified water supply assessment, as provided.
This bill, among other things, would instead require a city or county, upon receipt of a preliminary application for a housing development project that meets certain conditions, or upon a development application for certain projects being determined as complete or deemed complete, to make that identification of public water systems. The bill would require a city or county, within 15 days of receiving an application that meets either of the above-mentioned criteria, to request each identified public water system to determine whether the projected water demand associated with the proposed project was included in the most recently adopted urban water management plan. By imposing additional duties on a city or county, the bill would impose a state-mandated local program.
Existing law requires the governing body of each identified public water system to submit the requested water supply assessment not later than 90 days from the date that the request was received. Existing law requires that the assessment be approved at a regular or special meeting, as provided.
This bill would require, for certain housing development projects, a public water system to submit the requested water supply assessment to the city or county no later than 45 days from the date that the request was received. The bill would provide that those water supply assessments do not need to be approved at a public meeting. The bill would also authorize a city or county to seek a writ of mandamus to compel a public water system that fails to submit the water supply assessment to comply with the requirements relating to the submission of the water supply assessment.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to be responsible for determining whether a project is exempt from CEQA and whether an environmental impact report, a negative declaration, or a mitigated negative declaration is required. Existing law requires a city or county that determines a certain type of project is subject to the requirements of CEQA to identify any public water system that may supply water for the project and to request those public water systems to prepare a specified water supply assessment, as provided.
This bill bill, among other things, would instead require a city or county, upon receipt of a preliminary application for a housing development project that meets certain conditions, or upon deeming a development application for certain projects complete, being determined as complete or deemed complete, to make that identification of public water systems. The bill would require a city or county, within 15 days of receiving an application that meets either of the above-mentioned criteria, to request each identified public water system to determine whether the projected water demand associated with the proposed project was included in the most recently adopted urban water management plan. By imposing additional duties on a city or county, the bill would impose a state-mandated local program.
Existing law requires the governing body of each identified public water system to submit the requested water supply assessment not later than 90 days from the date that the request was received. Existing law requires that the assessment be approved at a regular or special meeting, as provided.
This bill would require, for certain housing development projects, a public water system to submit the requested water supply assessment to the city or county no later than 45 days from the date that the request was received. The bill would provide that those water supply assessments do not need to be approved at a public meeting. The bill would also authorize a city or county to seek a writ of mandamus to compel a public water system that fails to submit the water supply assessment to comply with the requirements relating to the submission of the water supply assessment.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to be responsible for determining whether a project is exempt from CEQA and whether an environmental impact report, a negative declaration, or a mitigated negative declaration is required. Existing law requires a city or county that determines a certain type of project is subject to the requirements of CEQA to identify any public water system that may supply water for the project and to request those public water systems to prepare a specified water supply assessment, as provided.
This bill would instead require a city or county to make that identification of public water systems for certain projects that the city or county approves, without regard to whether the project is determined to be subject to the requirements of CEQA. By imposing additional duties on a city or county, the bill would impose a state-mandated local program.This bill would instead require a city or county, upon receipt of a preliminary application for a housing development project that meets certain conditions, or upon deeming a development application for certain projects complete, to make that identification of public water systems. The bill would require a city or county, within 15 days of receiving an application that meets either of the above-mentioned criteria, to request each identified public water system to determine whether the projected water demand associated with the proposed project was included in the most recently adopted urban water management plan. By imposing additional duties on a city or county, the bill would impose a state-mandated local program.
Existing law requires the governing body of each identified public water system to submit the requested water supply assessment not later than 90 days from the date that the request was received. Existing law requires that the assessment be approved at a regular or special meeting, as provided.
This bill would require, for certain housing development projects, a public water system to submit the requested water supply assessment to the city or county no later than 45 days from the date that the request was received. The bill would provide that those water supply assessments do not need to be approved at a public meeting. The bill would also authorize a city or county to seek a writ of mandamus to compel a public water system that fails to submit the water supply assessment to comply with the requirements relating to the submission of the water supply assessment.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to be responsible for determining whether a project is exempt from CEQA and whether an environmental impact report, a negative declaration, or a mitigated negative declaration is required. Existing law requires a city or county that determines a certain type of project is subject to the requirements of CEQA to identify any public water system that may supply water for the project and to request those public water systems to prepare a specified water supply assessment, as provided.
This bill would instead require a city or county to make that identification of public water systems for certain projects that the city or county approves, without regard to whether the project is determined to be subject to the requirements of CEQA. By imposing additional duties on a city or county, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(a)Any city or county shall comply with this part when either of the following occurs:
(1)An applicant submits to the city or county a preliminary application pursuant to Section 65941.1 of the Government Code for a project, as defined in Section 10912, that meets the conditions set forth in Section 21080.66 of the Public Resources Code.
(2)For a project, as defined in Section 10912, that does not meet the conditions of paragraph (1), the city or county determines a development application is complete or a development application is deemed complete pursuant to Section 65943 of the Government Code.
(b)The city or county, upon receipt of an application that meets the criteria of subdivision (a), shall identify any water system whose service area includes the project site and any water system adjacent to the project site that is, or may become as a result of supplying water to the project identified pursuant to this subdivision, a public water system, as defined in Section 10912, that may supply water for the project. If the city or county is not able to identify any public water system that may supply water for the project, the city or county shall prepare the water assessment required by this part after consulting with any entity serving domestic water supplies whose service area includes the project site, the local agency formation commission, and any public water system adjacent to the project site.
(c)(1)The city or county, within 15 days of receipt of an application that meets the criteria of subdivision (a), shall request each public water system identified pursuant to subdivision (b) to determine whether the projected water demand associated with a proposed project was included as part of the most recently adopted urban water management plan adopted pursuant to Part 2.6 (commencing with Section 10610).
(2)If the projected water demand associated with the proposed project was accounted for in the most recently adopted urban water management plan, the public water system may incorporate the requested information from the urban water management plan in preparing the elements of the assessment required to comply with subdivisions (d), (e), (f), and (g).
(3)If the projected water demand associated with the proposed project was not accounted for in the most recently adopted urban water management plan, or the public water system has no urban water management plan, the water supply assessment for the project shall include a discussion with regard to whether the public water systems total projected water supplies available during normal, single dry, and multiple dry water years during a 20-year projection will meet the projected water demand associated with the proposed project, in addition to the public water systems existing and planned future uses, including agricultural and manufacturing uses.
(4)If the city or county is required to comply with this part pursuant to subdivision (b), the water supply assessment for the project shall include a discussion with regard to whether the total projected water supplies, determined to be available by the city or county for the project during normal, single dry, and multiple dry water years during a 20-year projection, will meet the projected water demand associated with the proposed project, in addition to existing and planned future uses, including agricultural and manufacturing uses.
(d)(1)The assessment required by this section shall include an identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and a description of the quantities of water received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts.
(2)An identification of existing water supply entitlements, water rights, or water service contracts held by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall be demonstrated by providing information related to all of the following:
(A)Written contracts or other proof of entitlement to an identified water supply.
(B)Copies of a capital outlay program for financing the delivery of a water supply that has been adopted by the public water system.
(C)Federal, state, and local permits for construction of necessary infrastructure associated with delivering the water supply.
(D)Any necessary regulatory approvals that are required in order to be able to convey or deliver the water supply.
(e)If no water has been received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts, the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall also include in its water supply assessment pursuant to subdivision (c), an identification of the other public water systems or water service contractholders that receive a water supply or have existing water supply entitlements, water rights, or water service contracts, to the same source of water as the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has identified as a source of water supply within its water supply assessments.
(f)If a water supply for a proposed project includes groundwater, the following additional information shall be included in the water supply assessment:
(1)A review of any information contained in the urban water management plan relevant to the identified water supply for the proposed project.
(2)(A)A description of any groundwater basin or basins from which the proposed project will be supplied.
(B)For those basins for which a court or the board has adjudicated the rights to pump groundwater, a copy of the order or decree adopted by the court or the board and a description of the amount of groundwater the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has the legal right to pump under the order or decree.
(C)For a basin that has not been adjudicated that is a basin designated as high- or medium-priority pursuant to Section 10722.4, information regarding the following:
(i)Whether the department has identified the basin as being subject to critical conditions of overdraft pursuant to Section 12924.
(ii)If a groundwater sustainability agency has adopted a groundwater sustainability plan or has an approved alternative, a copy of that alternative or plan.
(D)For a basin that has not been adjudicated that is a basin designated as low- or very low priority pursuant to Section 10722.4, information as to whether the department has identified the basin or basins as overdrafted or has projected that the basin will become overdrafted if present management conditions continue, in the most current bulletin of the department that characterizes the condition of the groundwater basin, and a detailed description by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), of the efforts being undertaken in the basin or basins to eliminate the long-term overdraft condition.
(3)A detailed description and analysis of the amount and location of groundwater pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), for the past five years from any groundwater basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
(4)A detailed description and analysis of the amount and location of groundwater that is projected to be pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), from any basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
(5)An analysis of the sufficiency of the groundwater from the basin or basins from which the proposed project will be supplied to meet the projected water demand associated with the proposed project. A water supply assessment shall not be required to include the information required by this paragraph if the public water system determines, as part of the review required by paragraph (1), that the sufficiency of groundwater necessary to meet the initial and projected water demand associated with the project was addressed in the description and analysis required by subparagraph (D) of paragraph (4) of subdivision (b) of Section 10631.
(g)(1)(A)For a project that does not meet the requirements of subparagraph (D) of paragraph (2), the governing body of each public water system shall submit the assessment to the city or county not later than 90 days from the date on which the request was received. The governing body of each public water system, or the governing body of the city or county water system if the city or county is required to comply with this part pursuant to subdivision (b), shall approve the assessment prepared pursuant to this section at a regular or special meeting.
(B)Prior to the expiration of the 90-day period, if the public water system intends to request an extension of time to prepare and adopt the assessment, the public water system shall meet with the city or county to request an extension of time, which shall not exceed 30 days, to prepare and adopt the assessment.
(C)If the public water system fails to request an extension of time, or fails to submit the assessment notwithstanding the extension of time granted pursuant to subparagraph (B), the city or county may seek a writ of mandamus to compel the governing body of the public water system to comply with the requirements of this part relating to the submission of the water supply assessment.
(2)(A)For a project described in subparagraph (D), the public water system shall submit the assessment to the city or county no later than 45 days from the date that the request was received.
(B)The governing body of each public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall not be required to approve the assessment at a public meeting.
(C)If the public water system fails to submit the assessment, the city or county may seek a writ of mandamus to compel the public water system to comply with the requirements of this part relating to the submission of the water supply assessment.
(D)This paragraph applies only to a project that meets either of the following conditions:
(i)The project meets the conditions in paragraph (1) of subdivision (a).
(ii)The project is proposed to be permitted pursuant to Section 65913.4 of the Government Code or Chapter 4.1 (commencing with Section 65912.100) of Division 1 of Title 7 of the Government Code.
(h)Notwithstanding any other provision of this part, if a project has been the subject of a water supply assessment that complies with the requirements of this part, no additional water supply assessment shall be required for subsequent projects that were part of a larger project for which a water supply assessment was completed and that has complied with the requirements of this part and for which the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has concluded that its water supplies are sufficient to meet the projected water demand associated with the proposed project, in addition to the existing and planned future uses, including, but not limited to, agricultural and industrial uses, unless one or more of the following changes occurs:
(1)Changes in the project that result in a substantial increase in water demand for the project.
(2)Changes in the circumstances or conditions substantially affecting the ability of the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), to provide a sufficient supply of water for the project.
(3)Significant new information becomes available that was not known and could not have been known at the time when the assessment was prepared.
(i)For the purposes of this section, hauled water is not considered as a source of water.
SEC. 2.Section 10911 of the Water Code is amended to read:10911.(a)If, as a result of its assessment, the public water system concludes that its water supplies are, or will be, insufficient, the public water system shall provide to the city or county its plans for acquiring additional water supplies, setting forth the measures that are being undertaken to acquire and develop those water supplies. If the city or county, if either is required to comply with this part pursuant to subdivision (b) of Section 10910, concludes as a result of its assessment, that water supplies are, or will be, insufficient, the city or county shall include in its water supply assessment its plans for acquiring additional water supplies, setting forth the measures that are being undertaken to acquire and develop those water supplies. Those plans may include, but are not limited to, information concerning all of the following:
(1)The estimated total costs, and the proposed method of financing the costs, associated with acquiring the additional water supplies.
(2)All federal, state, and local permits, approvals, or entitlements that are anticipated to be required in order to acquire and develop the additional water supplies.
(3)Based on the considerations set forth in paragraphs (1) and (2), the estimated timeframes within which the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b) of Section 10910, expects to be able to acquire additional water supplies.
(b)The city or county shall include the water supply assessment provided pursuant to Section 10910, and any information provided pursuant to subdivision (a), in any environmental document prepared for the project pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code.
(c)The city or county may include in any environmental document an evaluation of any information included in that environmental document provided pursuant to subdivision (b). The city or county shall determine, based on the entire record, whether projected water supplies will be sufficient to satisfy the demands of the project, in addition to existing and planned future uses. If the city or county determines that water supplies will not be sufficient, the city or county shall include that determination in its findings for the project.
SEC. 3.Section 10914 of the Water Code is amended to read:10914.(a)Nothing in this part is intended to create a right or entitlement to water service or any specific level of water service.
(b)Nothing in this part is intended to either impose, expand, or limit any duty concerning the obligation of a public water system to provide certain service to its existing customers or to any future potential customers.
(c)Nothing in this part is intended to modify or otherwise change existing law with respect to projects that are not subject to this part.
(d)A water supply assessment prepared pursuant to this part is an informational document and not a final agency action subject to judicial review except as part of either of the following:
(1)A challenge to a city or countys certification of an environmental impact report, or adoption of a negative declaration or mitigated negative declaration, for a housing development project that is a project, as defined in Section 10912.
(2)A challenge to a city or countys approval or disapproval of a project, as defined in Section 10912, that is not a housing development project.
(e)Nothing in this part shall be construed to do either of the following:
(1)Subject a project to discretionary review by a city or county if the project is required to be permitted ministerially pursuant to state law, including, but not limited to, Section 65913.4 of, and Chapter 4.1 (commencing with Section 65912.100) of Division 1 of Title 7 of, the Government Code.
(2)Subject a project to the requirements of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) if the project is otherwise exempt pursuant to any other law.
(f)For purposes of this section, housing development project has the same meaning as defined in Section 65589.5 of the Government Code.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)Any city or county shall comply with this part when either of the following occurs:
(1)An applicant submits to the city or county a preliminary application pursuant to Section 65941.1 of the Government Code for a project, as defined in Section 10912, that meets the conditions set forth in Section 21080.66 of the Public Resources Code.
(2)For a project, as defined in Section 10912, that does not meet the conditions of paragraph (1), the city or county determines a development application is complete or a development application is deemed complete pursuant to Section 65943 of the Government Code.
(b)The city or county, upon receipt of an application that meets the criteria of subdivision (a), shall identify any water system whose service area includes the project site and any water system adjacent to the project site that is, or may become as a result of supplying water to the project identified pursuant to this subdivision, a public water system, as defined in Section 10912, that may supply water for the project. If the city or county is not able to identify any public water system that may supply water for the project, the city or county shall prepare the water assessment required by this part after consulting with any entity serving domestic water supplies whose service area includes the project site, the local agency formation commission, and any public water system adjacent to the project site.
(c)(1)The city or county, within 15 days of receipt of an application that meets the criteria of subdivision (a), shall request each public water system identified pursuant to subdivision (b) to determine whether the projected water demand associated with a proposed project was included as part of the most recently adopted urban water management plan adopted pursuant to Part 2.6 (commencing with Section 10610).
(2)If the projected water demand associated with the proposed project was accounted for in the most recently adopted urban water management plan, the public water system may incorporate the requested information from the urban water management plan in preparing the elements of the assessment required to comply with subdivisions (d), (e), (f), and (g).
(3)If the projected water demand associated with the proposed project was not accounted for in the most recently adopted urban water management plan, or the public water system has no urban water management plan, the water supply assessment for the project shall include a discussion with regard to whether the public water systems total projected water supplies available during normal, single dry, and multiple dry water years during a 20-year projection will meet the projected water demand associated with the proposed project, in addition to the public water systems existing and planned future uses, including agricultural and manufacturing uses.
(4)If the city or county is required to comply with this part pursuant to subdivision (b), the water supply assessment for the project shall include a discussion with regard to whether the total projected water supplies, determined to be available by the city or county for the project during normal, single dry, and multiple dry water years during a 20-year projection, will meet the projected water demand associated with the proposed project, in addition to existing and planned future uses, including agricultural and manufacturing uses.
(d)(1)The assessment required by this section shall include an identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and a description of the quantities of water received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts.
(2)An identification of existing water supply entitlements, water rights, or water service contracts held by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall be demonstrated by providing information related to all of the following:
(A)Written contracts or other proof of entitlement to an identified water supply.
(B)Copies of a capital outlay program for financing the delivery of a water supply that has been adopted by the public water system.
(C)Federal, state, and local permits for construction of necessary infrastructure associated with delivering the water supply.
(D)Any necessary regulatory approvals that are required in order to be able to convey or deliver the water supply.
(e)If no water has been received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts, the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall also include in its water supply assessment pursuant to subdivision (c), an identification of the other public water systems or water service contractholders that receive a water supply or have existing water supply entitlements, water rights, or water service contracts, to the same source of water as the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has identified as a source of water supply within its water supply assessments.
(f)If a water supply for a proposed project includes groundwater, the following additional information shall be included in the water supply assessment:
(1)A review of any information contained in the urban water management plan relevant to the identified water supply for the proposed project.
(2)(A)A description of any groundwater basin or basins from which the proposed project will be supplied.
(B)For those basins for which a court or the board has adjudicated the rights to pump groundwater, a copy of the order or decree adopted by the court or the board and a description of the amount of groundwater the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has the legal right to pump under the order or decree.
(C)For a basin that has not been adjudicated that is a basin designated as high- or medium-priority pursuant to Section 10722.4, information regarding the following:
(i)Whether the department has identified the basin as being subject to critical conditions of overdraft pursuant to Section 12924.
(ii)If a groundwater sustainability agency has adopted a groundwater sustainability plan or has an approved alternative, a copy of that alternative or plan.
(D)For a basin that has not been adjudicated that is a basin designated as low- or very low priority pursuant to Section 10722.4, information as to whether the department has identified the basin or basins as overdrafted or has projected that the basin will become overdrafted if present management conditions continue, in the most current bulletin of the department that characterizes the condition of the groundwater basin, and a detailed description by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), of the efforts being undertaken in the basin or basins to eliminate the long-term overdraft condition.
(3)A detailed description and analysis of the amount and location of groundwater pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), for the past five years from any groundwater basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
(4)A detailed description and analysis of the amount and location of groundwater that is projected to be pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), from any basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
(5)An analysis of the sufficiency of the groundwater from the basin or basins from which the proposed project will be supplied to meet the projected water demand associated with the proposed project. A water supply assessment shall not be required to include the information required by this paragraph if the public water system determines, as part of the review required by paragraph (1), that the sufficiency of groundwater necessary to meet the initial and projected water demand associated with the project was addressed in the description and analysis required by subparagraph (D) of paragraph (4) of subdivision (b) of Section 10631.
(g)(1)(A)For a project that does not meet the requirements of subparagraph (D) of paragraph (2), the governing body of each public water system shall submit the assessment to the city or county not later than 90 days from the date on which the request was received. The governing body of each public water system, or the governing body of the city or county water system if the city or county is required to comply with this part pursuant to subdivision (b), shall approve the assessment prepared pursuant to this section at a regular or special meeting.
(B)Prior to the expiration of the 90-day period, if the public water system intends to request an extension of time to prepare and adopt the assessment, the public water system shall meet with the city or county to request an extension of time, which shall not exceed 30 days, to prepare and adopt the assessment.
(C)If the public water system fails to request an extension of time, or fails to submit the assessment notwithstanding the extension of time granted pursuant to subparagraph (B), the city or county may seek a writ of mandamus to compel the governing body of the public water system to comply with the requirements of this part relating to the submission of the water supply assessment.
(2)(A)For a project described in subparagraph (D), the public water system shall submit the assessment to the city or county no later than 45 days from the date that the request was received.
(B)The governing body of each public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall not be required to approve the assessment at a public meeting.
(C)If the public water system fails to submit the assessment, the city or county may seek a writ of mandamus to compel the public water system to comply with the requirements of this part relating to the submission of the water supply assessment.
(D)This paragraph applies only to a project that meets either of the following conditions:
(i)The project meets the conditions in paragraph (1) of subdivision (a).
(ii)The project is proposed to be permitted pursuant to Section 65913.4 of the Government Code or Chapter 4.1 (commencing with Section 65912.100) of Division 1 of Title 7 of the Government Code.
(h)Notwithstanding any other provision of this part, if a project has been the subject of a water supply assessment that complies with the requirements of this part, no additional water supply assessment shall be required for subsequent projects that were part of a larger project for which a water supply assessment was completed and that has complied with the requirements of this part and for which the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has concluded that its water supplies are sufficient to meet the projected water demand associated with the proposed project, in addition to the existing and planned future uses, including, but not limited to, agricultural and industrial uses, unless one or more of the following changes occurs:
(1)Changes in the project that result in a substantial increase in water demand for the project.
(2)Changes in the circumstances or conditions substantially affecting the ability of the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), to provide a sufficient supply of water for the project.
(3)Significant new information becomes available that was not known and could not have been known at the time when the assessment was prepared.
(i)For the purposes of this section, hauled water is not considered as a source of water.
SEC. 2.Section 10911 of the Water Code is amended to read:10911.(a)If, as a result of its assessment, the public water system concludes that its water supplies are, or will be, insufficient, the public water system shall provide to the city or county its plans for acquiring additional water supplies, setting forth the measures that are being undertaken to acquire and develop those water supplies. If the city or county, if either is required to comply with this part pursuant to subdivision (b) of Section 10910, concludes as a result of its assessment, that water supplies are, or will be, insufficient, the city or county shall include in its water supply assessment its plans for acquiring additional water supplies, setting forth the measures that are being undertaken to acquire and develop those water supplies. Those plans may include, but are not limited to, information concerning all of the following:
(1)The estimated total costs, and the proposed method of financing the costs, associated with acquiring the additional water supplies.
(2)All federal, state, and local permits, approvals, or entitlements that are anticipated to be required in order to acquire and develop the additional water supplies.
(3)Based on the considerations set forth in paragraphs (1) and (2), the estimated timeframes within which the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b) of Section 10910, expects to be able to acquire additional water supplies.
(b)The city or county shall include the water supply assessment provided pursuant to Section 10910, and any information provided pursuant to subdivision (a), in any environmental document prepared for the project pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code.
(c)The city or county may include in any environmental document an evaluation of any information included in that environmental document provided pursuant to subdivision (b). The city or county shall determine, based on the entire record, whether projected water supplies will be sufficient to satisfy the demands of the project, in addition to existing and planned future uses. If the city or county determines that water supplies will not be sufficient, the city or county shall include that determination in its findings for the project.
SEC. 3.Section 10914 of the Water Code is amended to read:10914.(a)Nothing in this part is intended to create a right or entitlement to water service or any specific level of water service.
(b)Nothing in this part is intended to either impose, expand, or limit any duty concerning the obligation of a public water system to provide certain service to its existing customers or to any future potential customers.
(c)Nothing in this part is intended to modify or otherwise change existing law with respect to projects that are not subject to this part.
(d)A water supply assessment prepared pursuant to this part is an informational document and not a final agency action subject to judicial review except as part of either of the following:
(1)A challenge to a city or countys certification of an environmental impact report, or adoption of a negative declaration or mitigated negative declaration, for a housing development project that is a project, as defined in Section 10912.
(2)A challenge to a city or countys approval or disapproval of a project, as defined in Section 10912, that is not a housing development project.
(e)Nothing in this part shall be construed to do either of the following:
(1)Subject a project to discretionary review by a city or county if the project is required to be permitted ministerially pursuant to state law, including, but not limited to, Section 65913.4 of, and Chapter 4.1 (commencing with Section 65912.100) of Division 1 of Title 7 of, the Government Code.
(2)Subject a project to the requirements of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) if the project is otherwise exempt pursuant to any other law.
(f)For purposes of this section, housing development project has the same meaning as defined in Section 65589.5 of the Government Code.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)Any city or county shall comply with this part when either of the following occurs:
(1)An applicant submits to the city or county a preliminary application pursuant to Section 65941.1 of the Government Code for a project, as defined in Section 10912, that meets the conditions set forth in Section 21080.66 of the Public Resources Code.
(2)For a project, as defined in Section 10912, that does not meet the conditions of paragraph (1), the city or county determines a development application is complete or a development application is deemed complete pursuant to Section 65943 of the Government Code.
(b)The city or county, upon receipt of an application that meets the criteria of subdivision (a), shall identify any water system whose service area includes the project site and any water system adjacent to the project site that is, or may become as a result of supplying water to the project identified pursuant to this subdivision, a public water system, as defined in Section 10912, that may supply water for the project. If the city or county is not able to identify any public water system that may supply water for the project, the city or county shall prepare the water assessment required by this part after consulting with any entity serving domestic water supplies whose service area includes the project site, the local agency formation commission, and any public water system adjacent to the project site.
(c)(1)The city or county, within 15 days of receipt of an application that meets the criteria of subdivision (a), shall request each public water system identified pursuant to subdivision (b) to determine whether the projected water demand associated with a proposed project was included as part of the most recently adopted urban water management plan adopted pursuant to Part 2.6 (commencing with Section 10610).
(2)If the projected water demand associated with the proposed project was accounted for in the most recently adopted urban water management plan, the public water system may incorporate the requested information from the urban water management plan in preparing the elements of the assessment required to comply with subdivisions (d), (e), (f), and (g).
(3)If the projected water demand associated with the proposed project was not accounted for in the most recently adopted urban water management plan, or the public water system has no urban water management plan, the water supply assessment for the project shall include a discussion with regard to whether the public water systems total projected water supplies available during normal, single dry, and multiple dry water years during a 20-year projection will meet the projected water demand associated with the proposed project, in addition to the public water systems existing and planned future uses, including agricultural and manufacturing uses.
(4)If the city or county is required to comply with this part pursuant to subdivision (b), the water supply assessment for the project shall include a discussion with regard to whether the total projected water supplies, determined to be available by the city or county for the project during normal, single dry, and multiple dry water years during a 20-year projection, will meet the projected water demand associated with the proposed project, in addition to existing and planned future uses, including agricultural and manufacturing uses.
(d)(1)The assessment required by this section shall include an identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and a description of the quantities of water received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts.
(2)An identification of existing water supply entitlements, water rights, or water service contracts held by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall be demonstrated by providing information related to all of the following:
(A)Written contracts or other proof of entitlement to an identified water supply.
(B)Copies of a capital outlay program for financing the delivery of a water supply that has been adopted by the public water system.
(C)Federal, state, and local permits for construction of necessary infrastructure associated with delivering the water supply.
(D)Any necessary regulatory approvals that are required in order to be able to convey or deliver the water supply.
(e)If no water has been received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts, the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall also include in its water supply assessment pursuant to subdivision (c), an identification of the other public water systems or water service contractholders that receive a water supply or have existing water supply entitlements, water rights, or water service contracts, to the same source of water as the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has identified as a source of water supply within its water supply assessments.
(f)If a water supply for a proposed project includes groundwater, the following additional information shall be included in the water supply assessment:
(1)A review of any information contained in the urban water management plan relevant to the identified water supply for the proposed project.
(2)(A)A description of any groundwater basin or basins from which the proposed project will be supplied.
(B)For those basins for which a court or the board has adjudicated the rights to pump groundwater, a copy of the order or decree adopted by the court or the board and a description of the amount of groundwater the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has the legal right to pump under the order or decree.
(C)For a basin that has not been adjudicated that is a basin designated as high- or medium-priority pursuant to Section 10722.4, information regarding the following:
(i)Whether the department has identified the basin as being subject to critical conditions of overdraft pursuant to Section 12924.
(ii)If a groundwater sustainability agency has adopted a groundwater sustainability plan or has an approved alternative, a copy of that alternative or plan.
(D)For a basin that has not been adjudicated that is a basin designated as low- or very low priority pursuant to Section 10722.4, information as to whether the department has identified the basin or basins as overdrafted or has projected that the basin will become overdrafted if present management conditions continue, in the most current bulletin of the department that characterizes the condition of the groundwater basin, and a detailed description by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), of the efforts being undertaken in the basin or basins to eliminate the long-term overdraft condition.
(3)A detailed description and analysis of the amount and location of groundwater pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), for the past five years from any groundwater basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
(4)A detailed description and analysis of the amount and location of groundwater that is projected to be pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), from any basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
(5)An analysis of the sufficiency of the groundwater from the basin or basins from which the proposed project will be supplied to meet the projected water demand associated with the proposed project. A water supply assessment shall not be required to include the information required by this paragraph if the public water system determines, as part of the review required by paragraph (1), that the sufficiency of groundwater necessary to meet the initial and projected water demand associated with the project was addressed in the description and analysis required by subparagraph (D) of paragraph (4) of subdivision (b) of Section 10631.
(g)(1)(A)For a project that does not meet the requirements of subparagraph (D) of paragraph (2), the governing body of each public water system shall submit the assessment to the city or county not later than 90 days from the date on which the request was received. The governing body of each public water system, or the governing body of the city or county water system if the city or county is required to comply with this part pursuant to subdivision (b), shall approve the assessment prepared pursuant to this section at a regular or special meeting.
(B)Prior to the expiration of the 90-day period, if the public water system intends to request an extension of time to prepare and adopt the assessment, the public water system shall meet with the city or county to request an extension of time, which shall not exceed 30 days, to prepare and adopt the assessment.
(C)If the public water system fails to request an extension of time, or fails to submit the assessment notwithstanding the extension of time granted pursuant to subparagraph (B), the city or county may seek a writ of mandamus to compel the governing body of the public water system to comply with the requirements of this part relating to the submission of the water supply assessment.
(2)(A)For a project described in subparagraph (D), the public water system shall submit the assessment to the city or county no later than 45 days from the date that the request was received.
(B)The governing body of each public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall not be required to approve the assessment at a public meeting.
(C)If the public water system fails to submit the assessment, the city or county may seek a writ of mandamus to compel the public water system to comply with the requirements of this part relating to the submission of the water supply assessment.
(D)This paragraph applies only to a project that meets either of the following conditions:
(i)The project meets the conditions in paragraph (1) of subdivision (a).
(ii)The project is proposed to be permitted pursuant to Section 65913.4 of the Government Code or Chapter 4.1 (commencing with Section 65912.100) of Division 1 of Title 7 of the Government Code.
(h)Notwithstanding any other provision of this part, if a project has been the subject of a water supply assessment that complies with the requirements of this part, no additional water supply assessment shall be required for subsequent projects that were part of a larger project for which a water supply assessment was completed and that has complied with the requirements of this part and for which the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has concluded that its water supplies are sufficient to meet the projected water demand associated with the proposed project, in addition to the existing and planned future uses, including, but not limited to, agricultural and industrial uses, unless one or more of the following changes occurs:
(1)Changes in the project that result in a substantial increase in water demand for the project.
(2)Changes in the circumstances or conditions substantially affecting the ability of the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), to provide a sufficient supply of water for the project.
(3)Significant new information becomes available that was not known and could not have been known at the time when the assessment was prepared.
(i)For the purposes of this section, hauled water is not considered as a source of water.
SEC. 2.Section 10911 of the Water Code is amended to read:10911.(a)If, as a result of its assessment, the public water system concludes that its water supplies are, or will be, insufficient, the public water system shall provide to the city or county its plans for acquiring additional water supplies, setting forth the measures that are being undertaken to acquire and develop those water supplies. If the city or county, if either is required to comply with this part pursuant to subdivision (b) of Section 10910, concludes as a result of its assessment, that water supplies are, or will be, insufficient, the city or county shall include in its water supply assessment its plans for acquiring additional water supplies, setting forth the measures that are being undertaken to acquire and develop those water supplies. Those plans may include, but are not limited to, information concerning all of the following:
(1)The estimated total costs, and the proposed method of financing the costs, associated with acquiring the additional water supplies.
(2)All federal, state, and local permits, approvals, or entitlements that are anticipated to be required in order to acquire and develop the additional water supplies.
(3)Based on the considerations set forth in paragraphs (1) and (2), the estimated timeframes within which the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b) of Section 10910, expects to be able to acquire additional water supplies.
(b)The city or county shall include the water supply assessment provided pursuant to Section 10910, and any information provided pursuant to subdivision (a), in any environmental document prepared for the project pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code.
(c)The city or county may include in any environmental document an evaluation of any information included in that environmental document provided pursuant to subdivision (b). The city or county shall determine, based on the entire record, whether projected water supplies will be sufficient to satisfy the demands of the project, in addition to existing and planned future uses. If the city or county determines that water supplies will not be sufficient, the city or county shall include that determination in its findings for the project.
SEC. 3.Section 10914 of the Water Code is amended to read:10914.(a)Nothing in this part is intended to create a right or entitlement to water service or any specific level of water service.
(b)Nothing in this part is intended to either impose, expand, or limit any duty concerning the obligation of a public water system to provide certain service to its existing customers or to any future potential customers.
(c)Nothing in this part is intended to modify or otherwise change existing law with respect to projects that are not subject to this part.
(d)A water supply assessment prepared pursuant to this part is an informational document and not a final agency action subject to judicial review except as part of either of the following:
(1)A challenge to a city or countys certification of an environmental impact report, or adoption of a negative declaration or mitigated negative declaration, for a housing development project. project that is a project, as defined in Section 10912.
(2)A challenge to a city or countys approval or disapproval of a project, as defined in Section 10912, that is not a housing development project.
(e)Nothing in this part shall be construed to do either of the following:
(1)Subject a project to discretionary review by a city or county if the project is required to be permitted ministerially pursuant to state law, including, but not limited to, Section 65913.4 of, and Chapter 4.1 (commencing with Section 65912.100) of Division 1 of Title 7 of, the Government Code.
(2)Subject a project to the requirements of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) if the project is otherwise exempt pursuant to any other law.
(f)For purposes of this section, housing development project has the same meaning as defined in Section 65589.5 of the Government Code.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)Any city or county shall comply with this part when either of the following occurs:
(1)An applicant submits to the city or county a preliminary application pursuant to Section 65941.1 of the Government Code for a project, as defined in Section 10912, that meets the conditions set forth in Section 21080.66 of the Public Resources Code.
(2)For a project, as defined in Section 10912, that does not meet the conditions of paragraph (1), the city or county determines a development application is complete or a development application is deemed complete pursuant to Section 65943 of the Government Code.
(b)The city or county, upon receipt of an application that meets the criteria of subdivision (a), shall identify any water system whose service area includes the project site and any water system adjacent to the project site that is, or may become as a result of supplying water to the project identified pursuant to this subdivision, a public water system, as defined in Section 10912, that may supply water for the project. If the city or county is not able to identify any public water system that may supply water for the project, the city or county shall prepare the water assessment required by this part after consulting with any entity serving domestic water supplies whose service area includes the project site, the local agency formation commission, and any public water system adjacent to the project site.
(c)(1)The city or county, within 15 days of receipt of an application that meets the criteria of subdivision (a), shall request each public water system identified pursuant to subdivision (b) to determine whether the projected water demand associated with a proposed project was included as part of the most recently adopted urban water management plan adopted pursuant to Part 2.6 (commencing with Section 10610).
(2)If the projected water demand associated with the proposed project was accounted for in the most recently adopted urban water management plan, the public water system may incorporate the requested information from the urban water management plan in preparing the elements of the assessment required to comply with subdivisions (d), (e), (f), and (g).
(3)If the projected water demand associated with the proposed project was not accounted for in the most recently adopted urban water management plan, or the public water system has no urban water management plan, the water supply assessment for the project shall include a discussion with regard to whether the public water systems total projected water supplies available during normal, single dry, and multiple dry water years during a 20-year projection will meet the projected water demand associated with the proposed project, in addition to the public water systems existing and planned future uses, including agricultural and manufacturing uses.
(4)If the city or county is required to comply with this part pursuant to subdivision (b), the water supply assessment for the project shall include a discussion with regard to whether the total projected water supplies, determined to be available by the city or county for the project during normal, single dry, and multiple dry water years during a 20-year projection, will meet the projected water demand associated with the proposed project, in addition to existing and planned future uses, including agricultural and manufacturing uses.
(d)(1)The assessment required by this section shall include an identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and a description of the quantities of water received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts.
(2)An identification of existing water supply entitlements, water rights, or water service contracts held by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall be demonstrated by providing information related to all of the following:
(A)Written contracts or other proof of entitlement to an identified water supply.
(B)Copies of a capital outlay program for financing the delivery of a water supply that has been adopted by the public water system.
(C)Federal, state, and local permits for construction of necessary infrastructure associated with delivering the water supply.
(D)Any necessary regulatory approvals that are required in order to be able to convey or deliver the water supply.
(e)If no water has been received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts, the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall also include in its water supply assessment pursuant to subdivision (c), an identification of the other public water systems or water service contractholders that receive a water supply or have existing water supply entitlements, water rights, or water service contracts, to the same source of water as the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has identified as a source of water supply within its water supply assessments.
(f)If a water supply for a proposed project includes groundwater, the following additional information shall be included in the water supply assessment:
(1)A review of any information contained in the urban water management plan relevant to the identified water supply for the proposed project.
(2)(A)A description of any groundwater basin or basins from which the proposed project will be supplied.
(B)For those basins for which a court or the board has adjudicated the rights to pump groundwater, a copy of the order or decree adopted by the court or the board and a description of the amount of groundwater the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has the legal right to pump under the order or decree.
(C)For a basin that has not been adjudicated that is a basin designated as high- or medium-priority pursuant to Section 10722.4, information regarding the following:
(i)Whether the department has identified the basin as being subject to critical conditions of overdraft pursuant to Section 12924.
(ii)If a groundwater sustainability agency has adopted a groundwater sustainability plan or has an approved alternative, a copy of that alternative or plan.
(D)For a basin that has not been adjudicated that is a basin designated as low- or very low priority pursuant to Section 10722.4, information as to whether the department has identified the basin or basins as overdrafted or has projected that the basin will become overdrafted if present management conditions continue, in the most current bulletin of the department that characterizes the condition of the groundwater basin, and a detailed description by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), of the efforts being undertaken in the basin or basins to eliminate the long-term overdraft condition.
(3)A detailed description and analysis of the amount and location of groundwater pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), for the past five years from any groundwater basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
(4)A detailed description and analysis of the amount and location of groundwater that is projected to be pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), from any basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
(5)An analysis of the sufficiency of the groundwater from the basin or basins from which the proposed project will be supplied to meet the projected water demand associated with the proposed project. A water supply assessment shall not be required to include the information required by this paragraph if the public water system determines, as part of the review required by paragraph (1), that the sufficiency of groundwater necessary to meet the initial and projected water demand associated with the project was addressed in the description and analysis required by subparagraph (D) of paragraph (4) of subdivision (b) of Section 10631.
(g)(1)(A)For a project that does not meet the requirements of subparagraph (D) of paragraph (2), the governing body of each public water system shall submit the assessment to the city or county not later than 90 days from the date on which the request was received. The governing body of each public water system, or the governing body of the city or county water system if the city or county is required to comply with this part pursuant to subdivision (b), shall approve the assessment prepared pursuant to this section at a regular or special meeting.
(B)Prior to the expiration of the 90-day period, if the public water system intends to request an extension of time to prepare and adopt the assessment, the public water system shall meet with the city or county to request an extension of time, which shall not exceed 30 days, to prepare and adopt the assessment.
(C)If the public water system fails to request an extension of time, or fails to submit the assessment notwithstanding the extension of time granted pursuant to subparagraph (B), the city or county may seek a writ of mandamus to compel the governing body of the public water system to comply with the requirements of this part relating to the submission of the water supply assessment.
(2)(A)For a project described in subparagraph (D), the public water system shall submit the assessment to the city or county no later than 45 days from the date that the request was received.
(B)The governing body of each public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall not be required to approve the assessment at a public meeting.
(C)If the public water system fails to submit the assessment, the city or county may seek a writ of mandamus to compel the public water system to comply with the requirements of this part relating to the submission of the water supply assessment.
(D)This paragraph applies only to a project that meets either of the following conditions:
(i)The project meets the conditions in paragraph (1) of subdivision (a).
(ii)The project is proposed to be permitted pursuant to Section 65913.4 of the Government Code or Chapter 4.1 (commencing with Section 65912.100) of Division 1 of Title 7 of the Government Code.
(h)Notwithstanding any other provision of this part, if a project has been the subject of a water supply assessment that complies with the requirements of this part, no additional water supply assessment shall be required for subsequent projects that were part of a larger project for which a water supply assessment was completed and that has complied with the requirements of this part and for which the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has concluded that its water supplies are sufficient to meet the projected water demand associated with the proposed project, in addition to the existing and planned future uses, including, but not limited to, agricultural and industrial uses, unless one or more of the following changes occurs:
(1)Changes in the project that result in a substantial increase in water demand for the project.
(2)Changes in the circumstances or conditions substantially affecting the ability of the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), to provide a sufficient supply of water for the project.
(3)Significant new information becomes available that was not known and could not have been known at the time when the assessment was prepared.
(i)For the purposes of this section, hauled water is not considered as a source of water.
SEC. 2.Section 10911 of the Water Code is amended to read:10911.(a)If, as a result of its assessment, the public water system concludes that its water supplies are, or will be, insufficient, the public water system shall provide to the city or county its plans for acquiring additional water supplies, setting forth the measures that are being undertaken to acquire and develop those water supplies. If the city or county, if either is required to comply with this part pursuant to subdivision (b), (b) of Section 10910, concludes as a result of its assessment, that water supplies are, or will be, insufficient, the city or county shall include in its water supply assessment its plans for acquiring additional water supplies, setting forth the measures that are being undertaken to acquire and develop those water supplies. Those plans may include, but are not limited to, information concerning all of the following:
(1)The estimated total costs, and the proposed method of financing the costs, associated with acquiring the additional water supplies.
(2)All federal, state, and local permits, approvals, or entitlements that are anticipated to be required in order to acquire and develop the additional water supplies.
(3)Based on the considerations set forth in paragraphs (1) and (2), the estimated timeframes within which the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), (b) of Section 10910, expects to be able to acquire additional water supplies.
(b)The city or county shall include the water supply assessment provided pursuant to Section 10910, and any information provided pursuant to subdivision (a), in any environmental document prepared for the project pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code.
(c)The city or county may include in any environmental document an evaluation of any information included in that environmental document provided pursuant to subdivision (b). The city or county shall determine, based on the entire record, whether projected water supplies will be sufficient to satisfy the demands of the project, in addition to existing and planned future uses. If the city or county determines that water supplies will not be sufficient, the city or county shall include that determination in its findings for the project.
SEC. 2.SEC. 3.Section 10914 of the Water Code is amended to read:10914.(a)Nothing in this part is intended to create a right or entitlement to water service or any specific level of water service.
(b)Nothing in this part is intended to either impose, expand, or limit any duty concerning the obligation of a public water system to provide certain service to its existing customers or to any future potential customers.
(c)Nothing in this part is intended to modify or otherwise change existing law with respect to projects that are not subject to this part.
(d)A water supply assessment prepared pursuant to this part is an informational document and not a final agency action. action subject to judicial review except as part of either of the following:
(1)A challenge to a city or countys certification of an environmental impact report, or adoption of a negative declaration or mitigated negative declaration, for a housing development project.
(2)A challenge to a city or countys approval or disapproval of a project, as defined in Section 10912, that is not a housing development project.
(e)Nothing in this part shall be construed to do either of the following:
(1)Subject a project to discretionary review by a city or county if the project is required to be permitted ministerially pursuant to state law, including, but not limited to, Section 65913.4 of, and Chapter 4.1 (commencing with Section 65912.100) of Division 1 of Title 7 of, the Government Code.
(2)Subject a project to the requirements of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) if the project is otherwise exempt pursuant to any other law.
(f)For purposes of this section, housing development project has the same meaning as defined in Section 65589.5 of the Government Code.
SEC. 3.SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)Any city or county shall comply with this part when either of the following occurs:
(1)An applicant submits to the city or county a preliminary application pursuant to Section 65941.1 of the Government Code for a project, as defined in Section 10912, that meets the conditions set forth in Section 21080.66 of the Public Resources Code.
(2)For a project, as defined in Section 10912, that does not meet the conditions of paragraph (1), the city or county deems determines a development application as complete is complete or a development application is deemed complete pursuant to Section 65943 of the Government Code.
(b)The city or county, upon receipt of an application that meets the criteria of subdivision (a), shall identify any water system whose service area includes the project site and any water system adjacent to the project site that is, or may become as a result of supplying water to the project identified pursuant to this subdivision, a public water system, as defined in Section 10912, that may supply water for the project. If the city or county is not able to identify any public water system that may supply water for the project, the city or county shall prepare the water assessment required by this part after consulting with any entity serving domestic water supplies whose service area includes the project site, the local agency formation commission, and any public water system adjacent to the project site.
(c)(1)The city or county, within 15 days of receipt of an application that meets the criteria of subdivision (a), shall request each public water system identified pursuant to subdivision (b) to determine whether the projected water demand associated with a proposed project was included as part of the most recently adopted urban water management plan adopted pursuant to Part 2.6 (commencing with Section 10610).
(2)If the projected water demand associated with the proposed project was accounted for in the most recently adopted urban water management plan, the public water system may incorporate the requested information from the urban water management plan in preparing the elements of the assessment required to comply with subdivisions (d), (e), (f), and (g).
(3)If the projected water demand associated with the proposed project was not accounted for in the most recently adopted urban water management plan, or the public water system has no urban water management plan, the water supply assessment for the project shall include a discussion with regard to whether the public water systems total projected water supplies available during normal, single dry, and multiple dry water years during a 20-year projection will meet the projected water demand associated with the proposed project, in addition to the public water systems existing and planned future uses, including agricultural and manufacturing uses.
(4)If the city or county is required to comply with this part pursuant to subdivision (b), the water supply assessment for the project shall include a discussion with regard to whether the total projected water supplies, determined to be available by the city or county for the project during normal, single dry, and multiple dry water years during a 20-year projection, will meet the projected water demand associated with the proposed project, in addition to existing and planned future uses, including agricultural and manufacturing uses.
(d)(1)The assessment required by this section shall include an identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and a description of the quantities of water received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts.
(2)An identification of existing water supply entitlements, water rights, or water service contracts held by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall be demonstrated by providing information related to all of the following:
(A)Written contracts or other proof of entitlement to an identified water supply.
(B)Copies of a capital outlay program for financing the delivery of a water supply that has been adopted by the public water system.
(C)Federal, state, and local permits for construction of necessary infrastructure associated with delivering the water supply.
(D)Any necessary regulatory approvals that are required in order to be able to convey or deliver the water supply.
(e)If no water has been received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts, the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall also include in its water supply assessment pursuant to subdivision (c), an identification of the other public water systems or water service contractholders that receive a water supply or have existing water supply entitlements, water rights, or water service contracts, to the same source of water as the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has identified as a source of water supply within its water supply assessments.
(f)If a water supply for a proposed project includes groundwater, the following additional information shall be included in the water supply assessment:
(1)A review of any information contained in the urban water management plan relevant to the identified water supply for the proposed project.
(2)(A)A description of any groundwater basin or basins from which the proposed project will be supplied.
(B)For those basins for which a court or the board has adjudicated the rights to pump groundwater, a copy of the order or decree adopted by the court or the board and a description of the amount of groundwater the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has the legal right to pump under the order or decree.
(C)For a basin that has not been adjudicated that is a basin designated as high- or medium-priority pursuant to Section 10722.4, information regarding the following:
(i)Whether the department has identified the basin as being subject to critical conditions of overdraft pursuant to Section 12924.
(ii)If a groundwater sustainability agency has adopted a groundwater sustainability plan or has an approved alternative, a copy of that alternative or plan.
(D)For a basin that has not been adjudicated that is a basin designated as low- or very low priority pursuant to Section 10722.4, information as to whether the department has identified the basin or basins as overdrafted or has projected that the basin will become overdrafted if present management conditions continue, in the most current bulletin of the department that characterizes the condition of the groundwater basin, and a detailed description by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), of the efforts being undertaken in the basin or basins to eliminate the long-term overdraft condition.
(3)A detailed description and analysis of the amount and location of groundwater pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), for the past five years from any groundwater basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
(4)A detailed description and analysis of the amount and location of groundwater that is projected to be pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), from any basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
(5)An analysis of the sufficiency of the groundwater from the basin or basins from which the proposed project will be supplied to meet the projected water demand associated with the proposed project. A water supply assessment shall not be required to include the information required by this paragraph if the public water system determines, as part of the review required by paragraph (1), that the sufficiency of groundwater necessary to meet the initial and projected water demand associated with the project was addressed in the description and analysis required by subparagraph (D) of paragraph (4) of subdivision (b) of Section 10631.
(g)(1)(A)For a project that does not meet the requirements of subparagraph (D) of paragraph (2), the governing body of each public water system shall submit the assessment to the city or county not later than 90 days from the date on which the request was received. The governing body of each public water system, or the governing body of the city or county if either water system if the city or county is required to comply with this part pursuant to subdivision (b), shall approve the assessment prepared pursuant to this section at a regular or special meeting.
(B)Prior to the expiration of the 90-day period, if the public water system intends to request an extension of time to prepare and adopt the assessment, the public water system shall meet with the city or county to request an extension of time, which shall not exceed 30 days, to prepare and adopt the assessment.
(C)If the public water system fails to request an extension of time, or fails to submit the assessment notwithstanding the extension of time granted pursuant to subparagraph (B), the city or county may seek a writ of mandamus to compel the governing body of the public water system to comply with the requirements of this part relating to the submission of the water supply assessment.
(2)(A)For a project described in subparagraph (D), the public water system shall submit the assessment to the city or county no later than 45 days from the date that the request was received.
(B)The governing body of each public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall not be required to approve the assessment at a public meeting.
(C)If the public water system fails to submit the assessment, the city or county may seek a writ of mandamus to compel the public water system to comply with the requirements of this part relating to the submission of the water supply assessment.
(D)This paragraph applies only to a project that meets either of the following conditions:
(i)The project meets the conditions in paragraph (1) of subdivision (a).
(ii)The project is proposed to be permitted pursuant to Section 65913.4 of the Government Code or Chapter 4.1 (commencing with Section 65912.100) of Division 1 of Title 7 of the Government Code.
(h)Notwithstanding any other provision of this part, if a project has been the subject of a water supply assessment that complies with the requirements of this part, no additional water supply assessment shall be required for subsequent projects that were part of a larger project for which a water supply assessment was completed and that has complied with the requirements of this part and for which the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has concluded that its water supplies are sufficient to meet the projected water demand associated with the proposed project, in addition to the existing and planned future uses, including, but not limited to, agricultural and industrial uses, unless one or more of the following changes occurs:
(1)Changes in the project that result in a substantial increase in water demand for the project.
(2)Changes in the circumstances or conditions substantially affecting the ability of the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), to provide a sufficient supply of water for the project.
(3)Significant new information becomes available that was not known and could not have been known at the time when the assessment was prepared.
(i)For the purposes of this section, hauled water is not considered as a source of water.
SEC. 2.Section 10914 of the Water Code is amended to read:10914.(a)Nothing in this part is intended to create a right or entitlement to water service or any specific level of water service.
(b)Nothing in this part is intended to either impose, expand, or limit any duty concerning the obligation of a public water system to provide certain service to its existing customers or to any future potential customers.
(c)Nothing in this part is intended to modify or otherwise change existing law with respect to projects that are not subject to this part.
(d)A water supply assessment prepared pursuant to this part is an informational document and not a final agency action.
(e)Nothing in this part shall be construed to do either of the following:
(1)Subject a project to discretionary review by a city or county if the project is required to be permitted ministerially pursuant to state law, including, but not limited to, Section 65913.4 of, and Chapter 4.1 (commencing with Section 65912.100) of Division 1 of Title 7 of, the Government Code.
(2)Subject a project to the requirements of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) if the project is otherwise exempt pursuant to any other law.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)Any city or county that approves a project, as defined in Section 10912, shall comply with this part. shall comply with this part when either of the following occurs:
(1)An applicant submits to the city or county a preliminary application pursuant to Section 65941.1 of the Government Code for a project, as defined in Section 10912, that meets the conditions set forth in Section 21080.66 of the Public Resources Code.
(2)For a project, as defined in Section 10912, that does not meet the conditions of paragraph (1), the city or county deems a development application as complete pursuant to Section 65943 of the Government Code.
(b)The city or county, at the time that it makes the determination required pursuant to Section 21080.1 of the Public Resources Code, upon receipt of an application that meets the criteria of subdivision (a), shall identify any water system whose service area includes the project site and any water system adjacent to the project site that is, or may become as a result of supplying water to the project identified pursuant to this subdivision, a public water system, as defined in Section 10912, that may supply water for the project. If the city or county is not able to identify any public water system that may supply water for the project, the city or county shall prepare the water assessment required by this part after consulting with any entity serving domestic water supplies whose service area includes the project site, the local agency formation commission, and any public water system adjacent to the project site.
(c)(1)The city or county, at the time it makes the determination required under Section 21080.1 of the Public Resources Code, within 15 days of receipt of an application that meets the criteria of subdivision (a), shall request each public water system identified pursuant to subdivision (b) to determine whether the projected water demand associated with a proposed project was included as part of the most recently adopted urban water management plan adopted pursuant to Part 2.6 (commencing with Section 10610).
(2)If the projected water demand associated with the proposed project was accounted for in the most recently adopted urban water management plan, the public water system may incorporate the requested information from the urban water management plan in preparing the elements of the assessment required to comply with subdivisions (d), (e), (f), and (g).
(3)If the projected water demand associated with the proposed project was not accounted for in the most recently adopted urban water management plan, or the public water system has no urban water management plan, the water supply assessment for the project shall include a discussion with regard to whether the public water systems total projected water supplies available during normal, single dry, and multiple dry water years during a 20-year projection will meet the projected water demand associated with the proposed project, in addition to the public water systems existing and planned future uses, including agricultural and manufacturing uses.
(4)If the city or county is required to comply with this part pursuant to subdivision (b), the water supply assessment for the project shall include a discussion with regard to whether the total projected water supplies, determined to be available by the city or county for the project during normal, single dry, and multiple dry water years during a 20-year projection, will meet the projected water demand associated with the proposed project, in addition to existing and planned future uses, including agricultural and manufacturing uses.
(d)(1)The assessment required by this section shall include an identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and a description of the quantities of water received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts.
(2)An identification of existing water supply entitlements, water rights, or water service contracts held by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall be demonstrated by providing information related to all of the following:
(A)Written contracts or other proof of entitlement to an identified water supply.
(B)Copies of a capital outlay program for financing the delivery of a water supply that has been adopted by the public water system.
(C)Federal, state, and local permits for construction of necessary infrastructure associated with delivering the water supply.
(D)Any necessary regulatory approvals that are required in order to be able to convey or deliver the water supply.
(e)If no water has been received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts, the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall also include in its water supply assessment pursuant to subdivision (c), an identification of the other public water systems or water service contractholders that receive a water supply or have existing water supply entitlements, water rights, or water service contracts, to the same source of water as the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has identified as a source of water supply within its water supply assessments.
(f)If a water supply for a proposed project includes groundwater, the following additional information shall be included in the water supply assessment:
(1)A review of any information contained in the urban water management plan relevant to the identified water supply for the proposed project.
(2)(A)A description of any groundwater basin or basins from which the proposed project will be supplied.
(B)For those basins for which a court or the board has adjudicated the rights to pump groundwater, a copy of the order or decree adopted by the court or the board and a description of the amount of groundwater the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has the legal right to pump under the order or decree.
(C)For a basin that has not been adjudicated that is a basin designated as high- or medium-priority pursuant to Section 10722.4, information regarding the following:
(i)Whether the department has identified the basin as being subject to critical conditions of overdraft pursuant to Section 12924.
(ii)If a groundwater sustainability agency has adopted a groundwater sustainability plan or has an approved alternative, a copy of that alternative or plan.
(D)For a basin that has not been adjudicated that is a basin designated as low- or very low priority pursuant to Section 10722.4, information as to whether the department has identified the basin or basins as overdrafted or has projected that the basin will become overdrafted if present management conditions continue, in the most current bulletin of the department that characterizes the condition of the groundwater basin, and a detailed description by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), of the efforts being undertaken in the basin or basins to eliminate the long-term overdraft condition.
(3)A detailed description and analysis of the amount and location of groundwater pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), for the past five years from any groundwater basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
(4)A detailed description and analysis of the amount and location of groundwater that is projected to be pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), from any basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
(5)An analysis of the sufficiency of the groundwater from the basin or basins from which the proposed project will be supplied to meet the projected water demand associated with the proposed project. A water supply assessment shall not be required to include the information required by this paragraph if the public water system determines, as part of the review required by paragraph (1), that the sufficiency of groundwater necessary to meet the initial and projected water demand associated with the project was addressed in the description and analysis required by subparagraph (D) of paragraph (4) of subdivision (b) of Section 10631.
(g)(1)Subject to (A)For a project that does not meet the requirements of subparagraph (D) of paragraph (2), the governing body of each public water system shall submit the assessment to the city or county not later than 90 days from the date on which the request was received. The governing body of each public water system, or the city or county if either is required to comply with this act part pursuant to subdivision (b), shall approve the assessment prepared pursuant to this section at a regular or special meeting.
(2)(B)Prior to the expiration of the 90-day period, if the public water system intends to request an extension of time to prepare and adopt the assessment, the public water system shall meet with the city or county to request an extension of time, which shall not exceed 30 days, to prepare and adopt the assessment.
(3)(C)If the public water system fails to request an extension of time, or fails to submit the assessment notwithstanding the extension of time granted pursuant to paragraph (2), subparagraph (B), the city or county may seek a writ of mandamus to compel the governing body of the public water system to comply with the requirements of this part relating to the submission of the water supply assessment.
(2)(A)For a project described in subparagraph (D), the public water system shall submit the assessment to the city or county no later than 45 days from the date that the request was received.
(B)The governing body of each public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall not be required to approve the assessment at a public meeting.
(C)If the public water system fails to submit the assessment, the city or county may seek a writ of mandamus to compel the public water system to comply with the requirements of this part relating to the submission of the water supply assessment.
(D)This paragraph applies only to a project that meets either of the following conditions:
(i)The project meets the conditions in paragraph (1) of subdivision (a).
(ii)The project is proposed to be permitted pursuant to Section 65913.4 of the Government Code or Chapter 4.1 (commencing with Section 65912.100) of Division 1 of Title 7 of the Government Code.
(h)Notwithstanding any other provision of this part, if a project has been the subject of a water supply assessment that complies with the requirements of this part, no additional water supply assessment shall be required for subsequent projects that were part of a larger project for which a water supply assessment was completed and that has complied with the requirements of this part and for which the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has concluded that its water supplies are sufficient to meet the projected water demand associated with the proposed project, in addition to the existing and planned future uses, including, but not limited to, agricultural and industrial uses, unless one or more of the following changes occurs:
(1)Changes in the project that result in a substantial increase in water demand for the project.
(2)Changes in the circumstances or conditions substantially affecting the ability of the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), to provide a sufficient supply of water for the project.
(3)Significant new information becomes available that was not known and could not have been known at the time when the assessment was prepared.
(i)For the purposes of this section, hauled water is not considered as a source of water.
SEC. 2.Section 10914 of the Water Code is amended to read:10914.(a)Nothing in this part is intended to create a right or entitlement to water service or any specific level of water service.
(b)Nothing in this part is intended to either impose, expand, or limit any duty concerning the obligation of a public water system to provide certain service to its existing customers or to any future potential customers.
(c)Nothing in this part is intended to modify or otherwise change existing law with respect to projects which that are not subject to this part.
(d)This part applies only to a project for which a notice of preparation is submitted on or after January 1, 1996.SEC. 2.SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)Any city or county that determines that approves a project, as defined in Section 10912, is subject to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) under Section 21080 of the Public Resources Code shall comply with this part.
(b)The city or county, at the time that it determines whether an environmental impact report, a negative declaration, or a mitigated negative declaration is required for any project subject to the California Environmental Quality Act makes the determination required pursuant to Section 21080.1 of the Public Resources Code, shall identify any water system whose service area includes the project site and any water system adjacent to the project site that is, or may become as a result of supplying water to the project identified pursuant to this subdivision, a public water system, as defined in Section 10912, that may supply water for the project. If the city or county is not able to identify any public water system that may supply water for the project, the city or county shall prepare the water assessment required by this part after consulting with any entity serving domestic water supplies whose service area includes the project site, the local agency formation commission, and any public water system adjacent to the project site.
(c)(1)The city or county, at the time it makes the determination required under Section 21080.1 of the Public Resources Code, shall request each public water system identified pursuant to subdivision (b) to determine whether the projected water demand associated with a proposed project was included as part of the most recently adopted urban water management plan adopted pursuant to Part 2.6 (commencing with Section 10610).
(2)If the projected water demand associated with the proposed project was accounted for in the most recently adopted urban water management plan, the public water system may incorporate the requested information from the urban water management plan in preparing the elements of the assessment required to comply with subdivisions (d), (e), (f), and (g).
(3)If the projected water demand associated with the proposed project was not accounted for in the most recently adopted urban water management plan, or the public water system has no urban water management plan, the water supply assessment for the project shall include a discussion with regard to whether the public water systems total projected water supplies available during normal, single dry, and multiple dry water years during a 20-year projection will meet the projected water demand associated with the proposed project, in addition to the public water systems existing and planned future uses, including agricultural and manufacturing uses.
(4)If the city or county is required to comply with this part pursuant to subdivision (b), the water supply assessment for the project shall include a discussion with regard to whether the total projected water supplies, determined to be available by the city or county for the project during normal, single dry, and multiple dry water years during a 20-year projection, will meet the projected water demand associated with the proposed project, in addition to existing and planned future uses, including agricultural and manufacturing uses.
(d)(1)The assessment required by this section shall include an identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and a description of the quantities of water received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts.
(2)An identification of existing water supply entitlements, water rights, or water service contracts held by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall be demonstrated by providing information related to all of the following:
(A)Written contracts or other proof of entitlement to an identified water supply.
(B)Copies of a capital outlay program for financing the delivery of a water supply that has been adopted by the public water system.
(C)Federal, state, and local permits for construction of necessary infrastructure associated with delivering the water supply.
(D)Any necessary regulatory approvals that are required in order to be able to convey or deliver the water supply.
(e)If no water has been received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts, the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall also include in its water supply assessment pursuant to subdivision (c), an identification of the other public water systems or water service contractholders that receive a water supply or have existing water supply entitlements, water rights, or water service contracts, to the same source of water as the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has identified as a source of water supply within its water supply assessments.
(f)If a water supply for a proposed project includes groundwater, the following additional information shall be included in the water supply assessment:
(1)A review of any information contained in the urban water management plan relevant to the identified water supply for the proposed project.
(2)(A)A description of any groundwater basin or basins from which the proposed project will be supplied.
(B)For those basins for which a court or the board has adjudicated the rights to pump groundwater, a copy of the order or decree adopted by the court or the board and a description of the amount of groundwater the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has the legal right to pump under the order or decree.
(C)For a basin that has not been adjudicated that is a basin designated as high- or medium-priority pursuant to Section 10722.4, information regarding the following:
(i)Whether the department has identified the basin as being subject to critical conditions of overdraft pursuant to Section 12924.
(ii)If a groundwater sustainability agency has adopted a groundwater sustainability plan or has an approved alternative, a copy of that alternative or plan.
(D)For a basin that has not been adjudicated that is a basin designated as low- or very low priority pursuant to Section 10722.4, information as to whether the department has identified the basin or basins as overdrafted or has projected that the basin will become overdrafted if present management conditions continue, in the most current bulletin of the department that characterizes the condition of the groundwater basin, and a detailed description by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), of the efforts being undertaken in the basin or basins to eliminate the long-term overdraft condition.
(3)A detailed description and analysis of the amount and location of groundwater pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), for the past five years from any groundwater basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
(4)A detailed description and analysis of the amount and location of groundwater that is projected to be pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), from any basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
(5)An analysis of the sufficiency of the groundwater from the basin or basins from which the proposed project will be supplied to meet the projected water demand associated with the proposed project. A water supply assessment shall not be required to include the information required by this paragraph if the public water system determines, as part of the review required by paragraph (1), that the sufficiency of groundwater necessary to meet the initial and projected water demand associated with the project was addressed in the description and analysis required by subparagraph (D) of paragraph (4) of subdivision (b) of Section 10631.
(g)(1)Subject to paragraph (2), the governing body of each public water system shall submit the assessment to the city or county not later than 90 days from the date on which the request was received. The governing body of each public water system, or the city or county if either is required to comply with this act pursuant to subdivision (b), shall approve the assessment prepared pursuant to this section at a regular or special meeting.
(2)Prior to the expiration of the 90-day period, if the public water system intends to request an extension of time to prepare and adopt the assessment, the public water system shall meet with the city or county to request an extension of time, which shall not exceed 30 days, to prepare and adopt the assessment.
(3)If the public water system fails to request an extension of time, or fails to submit the assessment notwithstanding the extension of time granted pursuant to paragraph (2), the city or county may seek a writ of mandamus to compel the governing body of the public water system to comply with the requirements of this part relating to the submission of the water supply assessment.
(h)Notwithstanding any other provision of this part, if a project has been the subject of a water supply assessment that complies with the requirements of this part, no additional water supply assessment shall be required for subsequent projects that were part of a larger project for which a water supply assessment was completed and that has complied with the requirements of this part and for which the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has concluded that its water supplies are sufficient to meet the projected water demand associated with the proposed project, in addition to the existing and planned future uses, including, but not limited to, agricultural and industrial uses, unless one or more of the following changes occurs:
(1)Changes in the project that result in a substantial increase in water demand for the project.
(2)Changes in the circumstances or conditions substantially affecting the ability of the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), to provide a sufficient supply of water for the project.
(3)Significant new information becomes available that was not known and could not have been known at the time when the assessment was prepared.
(i)For the purposes of this section, hauled water is not considered as a source of water.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
|
Date
|
Status
|
|---|---|
| Sep 30, 2026 | Chaptered by Secretary of State. Chapter 1004, Statutes of 2026. |
| Sep 30, 2026 | Approved by the Governor. |
| Sep 3, 2026 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 27, 2026 | Assembly amendments concurred in. (Ayes 40. Noes 0. Page 6025.) Ordered to engrossing and enrolling. |
| Aug 27, 2026 | Assembly amendments concurred in. (Ayes 39. Noes 0.) Ordered to engrossing and enrolling. |
| Aug 26, 2026 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 26, 2026 | Read third time. Passed. (Ayes 79. Noes 0. Page 6615.) Ordered to the Senate. |
| Aug 26, 2026 | Read third time. Passed. Ordered to the Senate. |
| Aug 19, 2026 | Ordered to third reading. |
| Aug 19, 2026 | Read third time and amended. |
| Aug 6, 2026 | Read second time. Ordered to third reading. |
| Aug 5, 2026 | From committee: Do pass. (Ayes 15. Noes 0.) (August 5). |
| Jul 2, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 10. Noes 0.) (July 1). Re-referred to Com. on APPR. |
| Jun 17, 2026 | Read second time and amended. Re-referred to Com. on L. GOV. |
| Jun 16, 2026 | From committee: Do pass as amended and re-refer to Com. on L. GOV. (Ayes 11. Noes 0.) (June 16). |
| May 26, 2026 | Referred to Coms. on W., P., & W. and L. GOV. |
| May 19, 2026 | In Assembly. Read first time. Held at Desk. |
| May 18, 2026 | Read third time. Passed. (Ayes 35. Noes 1. Page 4318.) Ordered to the Assembly. |
| May 18, 2026 | Read third time. Passed. (Ayes 35. Noes 1.) Ordered to the Assembly. |
| May 12, 2026 | Read second time. Ordered to third reading. |
| May 11, 2026 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| May 4, 2026 | Set for hearing May 11. |
| Apr 23, 2026 | Read second time and amended. Re-referred to Com. on APPR. |
| Apr 22, 2026 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 7. Noes 0. Page 4014.) (April 22). |
| Apr 22, 2026 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 7. Noes 0.) (April 22). |
| Apr 14, 2026 | From committee: Do pass and re-refer to Com. on L. GOV. (Ayes 6. Noes 0. Page 3870.) (April 14). Re-referred to Com. on L. GOV. |
| Apr 14, 2026 | From committee: Do pass and re-refer to Com. on L. GOV. (Ayes 6. Noes 0.) (April 14). Re-referred to Com. on L. GOV. |
| Apr 10, 2026 | Set for hearing April 22 in L. GOV. pending receipt. |
| Apr 7, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on N.R. & W. |
| Apr 2, 2026 | Set for hearing April 14. |
| Mar 24, 2026 | March 24 set for first hearing canceled at the request of author. |
| Mar 11, 2026 | Set for hearing March 24. |
| Feb 26, 2026 | Referred to Coms. on N.R. & W. and L. GOV. |
| Feb 17, 2026 | From printer. May be acted upon on or after March 16. |
| Feb 13, 2026 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 27, 2026 | Unfinished Business SB1085 Durazo et al. Concurrence | Senate Floor |
Passed |
|
| Aug 26, 2026 | SB 1085 Durazo Senate Third Reading By Bryan | Assembly Floor |
Passed |
|
| Aug 5, 2026 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jul 1, 2026 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Local Government |
Passed |
|
| Jun 16, 2026 | Do pass as amended and be re-referred to the Committee on [Local Government] | Assembly Standing Committee on Water, Parks, and Wildlife |
Passed |
|
| May 18, 2026 | Senate 3rd Reading SB1085 Durazo et al. | Senate Floor |
Passed |
|
| Apr 22, 2026 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Local Government |
Passed |
|
| Apr 14, 2026 | Do pass, but first be re-referred to the Committee on [Local Government] | Senate Standing Committee on Natural Resources and Water |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Abundant Housing Los Angeles | ** Against | |
| American Planning Association, California Chapter | ** Support | |
| Association of California Water Agencies (ACWA) | ** Support | |
| California Building Industry Association | ** Support | |
| California Coastkeeper Alliance | ** Support | |
| California Council For Affordable Housing | ** Against | |
| California Environmental Voters | ** Support | |
| California Farm Bureau | ** Support | |
| California Municipal Utilities Association | ** Support | |
| California-Nevada Section, American Water Works Association | ** Support | |
| California Special Districts Association | ** Support | |
| California State Association of Counties (CSAC) | ** Support | |
| California Water Association | ** Support | |
| California YIMBY | ** Against | |
| City Of Sacramento | ** Support | |
| City of Sacramento Department of Utilities | ** Support | |
| Clean Earth 4 Kids | ** Support | |
| Clean Water Action California | ** Support | |
| Community Alliance With Family Farmers | ** Support | |
| Community Water Center | ** Support | |
| Contra Costa Water District | ** Support | |
| Defenders Of Wildlife | ** Support | |
| East Bay Municipal Utilities District | ** Support | |
| East Bay Municipal Water District (EBMUD) | ** Support | |
| Fieldstead And Company | ** Against | |
| Friends of the River | ** Support | |
| Irvine Ranch Water District | ** Support | |
| Las Virgenes Municipal Water District | ** Support | |
| Leadership Counsel for Justice & Accountability | ** Support | |
| Leadership for Justice and Accountability | ** Support | |
| Mono Lake Committee | ** Support | |
| Olivenhain Municipal Water District | ** Support | |
| Planning And Conservation League | ** Support | |
| Rancho California Water District | ** Support | |
| Regional Water Authority | ** Support | |
| San Francisco Baykeeper | ** Support | |
| San Joaquin Valley Water Collaborative Action Program | ** Support | |
| Santa Clara Valley Water District | ** Support | |
| Sierra Club California | ** Support | |
| SPUR | ** Against | |
| State Building & Construction Trades Council Of California | ** Support | |
| Trout Unlimited | ** Support | |
| Unite Here International Union, Afl-Cio | ** Support | |
| Valley Water | ** Support | |
| Western Municipal Water District | ** Support | |
| Wholly H2O | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 1085 |
UNFINISHED BUSINESS
Bill No: SB 1085
Author: Durazo (D), et al.
Amended: 8/19/26
Vote: 21
SENATE NATURAL RES. & WATER COMMITTEE: 6-0, 4/14/26
AYES: Becker, Seyarto, Allen, Cabaldon, Cortese, Stern
NO VOTE RECORDED: Grove
SENATE LOCAL GOVERNMENT COMMITTEE: 7-0, 4/22/26
AYES: Durazo, Choi, Arreguín, Ashby, Cervantes, Laird, Seyarto
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SENATE FLOOR: 35-1, 5/18/26
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Ochoa Bogh, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson
NOES: Wiener
NO VOTE RECORDED: Becker, Jones, Niello, Padilla
ASSEMBLY FLOOR: 79-0, 8/26/26 - See last page for vote
SUBJECT: Water supply planning: housing developments
SOURCE: East Bay Municipal Water District
DIGEST:
Restores a requirement that cities and counties approving certain projects identify a water system that would supply water for that project and complete a water supply assessment (WSA).
Assembly Amendments
match the definition of “project” to the definition in existing law and state a WSA is only subject to judicial review when it is being challenged as part of a city or county’s certification of an environmental impact report, or adoption of a negative declaration or mitigated negative declaration, for a housing development project or when it’s being challenged as part of a non-housing development project.
ANALYSIS:
Existing law:
- Requires cities and counties that determine a project is subject to the California Environmental Quality Act (CEQA) to comply with certain water supply planning requirements.
- Defines, for purposes of water supply planning, a “project” as any proposed:
- Residential development of more than 500 dwelling units.
- Shopping center or business establishment employing more than 1,000 persons or having more than 500,000 square feet of floor space.
- Commercial office building employing more than 1,000 persons or having more than 250,000 square feet of floor space.
- Hotel or motel, or both, having more than 500 rooms.
- Industrial, manufacturing, or processing plant, or industrial park planned to house more than 1,000 persons, occupying more than 40 acres of land, or having more than 650,000 square feet of floor area.
- Mixed-use project that includes one or more of the above-described projects.
- Project that would demand an amount of water equal to, or greater than, the amount of water required by a 500 dwelling unit project.
- Residential, business, commercial, hotel or motel, industrial development or mixed use development that would – where a public water system has fewer than 5,000 service connections – increase the number of service connections by 10% percent or more.
- Requires the city or county to identify a water system to serve a proposed project and if one isn’t identifiable, the city or county must prepare a WSA.
- Exempts from CEQA – and by extension, from the requirement to prepare a WSA – a number of development projects listed in (2) above.
This bill:
- Requires a city or county to identify a water system that will serve a project and requires that water system – or the city or county if no water system is identified – to prepare a WSA once:
- An applicant submits a preliminary application for a housing development project that meets certain conditions, including that the project not be larger than 20 acres; or
- The county or city determines a development project application is completed and does not meet the conditions of (a).
- Requires the city or county, within 15 days of the application, to request the public water system to determine if the water demand of the project was included in the most recent urban water management plan (UWMP).
- Develops an expedited timeline of 45 days to complete a WSA for projects that comply with (1)(a) above or are affordable housing projects. Also allows the city or county to seek a writ of mandamus to compel the public water system to submit the WSA if it fails to do so.
- Determines the WSA is an informational document and not a final agency action subject to judicial review except when:
- A challenge is made to a city or county's CEQA documentation for a housing development project that is a WSA project; or
- A challenge is made to a city or county's approval or disapproval of a WSA project that is not a housing development project.
- States it does subject a project to:
- Discretionary review by a city or county if the project is required to be permitted ministerially; or
- The requirements of the CEQA if the project is exempt from CEQA.
Background\
“Show Me The … Water.” California's efforts to better align development decisions with available water resources stem largely from two statutes enacted in 2001. The laws were adopted in response to concerns that local governments were approving development projects without adequately considering whether sufficient water supplies existed to support those projects. The two 2001 measures established new requirements to integrate water supply considerations into the land use approval process.
The trigger for a city or county to request a WSA from a water supplier (or do it themselves) is when it determines certain large-scale projects are also subject to CEQA. A WSA requires any existing water supply entitlements, water rights, or relevant water service contracts to be identified for the proposed project, and a description of the amount of water received in prior years by the public water system or the city or county through its water rights or other sources. The WSA must be completed within 90 days of the request by the city or county, though the water system may request a 30-day extension. Once completed, the WSA must be incorporated into project’s CEQA analysis.
Feeling The Need For Speed, But Not Water? In an effort to speed up the permitting process, the Legislature has enacted various CEQA exemptions and converted certain projects to only require ministerial approval from a local government over the past several years. Last year, SB 131 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2025) and AB 130 (Committee on Budget, Chapter 22, Statutes of 2025) created several new CEQA exemptions. As noted above, a city or county is required to initiate a WSA request once it determines what kind of CEQA documentation is needed for that project. The enactment of SB 131 and AB 130 exempted many projects, such as advanced manufacturing facilities, maintenance facilities for electrically powered high-speed rail, and certain larger housing development projects, from not just CEQA but also from the water planning requirements in law.
Comments
- Purpose of the bill: According to the author, the bill “… restores an important, long-standing safeguard on water availability for large new developments that was inadvertently circumvented through recent legislation. For more than two decades, state law has required [WSAs] for certain large development projects to strengthen the link between land use planning and water supply planning. These assessments ensure that local governments have a clear, forward-looking understanding of whether sufficient water supplies exist to serve new development alongside existing and planned uses over a 20-year horizon.
“In recent years, the Legislature has appropriately focused on removing barriers to housing development, including through CEQA streamlining and exemptions. However, because WSAs are currently triggered by CEQA, these changes have had the unintended effect of removing this key planning tool for projects that still meet large development thresholds. Without a WSA, cities and counties may lack critical information about water demand and long-term supply reliability.
“At a time when climate change is increasing pressure on California's water systems, [this bill] ensures that this proven planning tool remains in place to support informed decision-making and sustainable growth.”
- Keep Your CEQA Exemption, But Not Your Water Planning Exemption. The bill does not reverse the CEQA exemptions granted to certain projects under last year’s SB 131 and AB 130. However, it does make it clear that projects benefitting from those CEQA exemptions do have to comply with the water planning laws that applied to them prior to the exemptions being created.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee, the bill imposes a state-mandated local program, but these costs are not state-reimbursable.
SUPPORT: (Verified 8/27/26)
East Bay Municipal Utilities District (source)
American Planning Association, California Chapter
Association of California Water Agencies (ACWA)
California Building Industry Association
California Coastkeeper Alliance
California Environmental Voters
California Farm Bureau
California Municipal Utilities Association
California Special Districts Association
California State Association of Counties (CSAC)
California Water Association
City of Sacramento
City of Sacramento Department of Utilities
Clean Earth 4 Kids
Clean Water Action California
Community Water Center
Community Alliance With Family Farmers
Contra Costa Water District
Defenders of Wildlife
Friends of the River
Irvine Ranch Water District
Las Virgenes Municipal Water District
Leadership Counsel for Justice & Accountability
Mono Lake Committee
Olivenhain Municipal Water District
Planning and Conservation League
Rancho California Water District
Regional Water Authority
San Francisco Baykeeper
San Joaquin Valley Water Collaborative Action Program
Santa Clara Valley Water District
Sierra Club California
State Building & Construction Trades Council of California
Trout Unlimited
Unite Here International Union, Afl-cio
Valley Water
Western Municipal Water District
Wholly H2O
OPPOSITION: (Verified 8/27/26)
None received.
ASSEMBLY FLOOR: 79-0 8/26/26
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Castillo, Chen, Connolly, Davies, DeMaio, Dixon, Elhawary, Ellis, Flora, Fong, Gabriel, Garcia, Gipson, Jeff Gonzalez, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Johnson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Sanchez, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ta, Tangipa, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
Prepared by: Evan Goldberg / N.R. & W. / (916) 651-4116
9/21/26 11:34:08
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 1085 |
UNFINISHED BUSINESS
Bill No: SB 1085
Author: Durazo (D), et al.
Amended: 8/19/26
Vote: 21
SENATE NATURAL RES. & WATER COMMITTEE: 6-0, 4/14/26
AYES: Becker, Seyarto, Allen, Cabaldon, Cortese, Stern
NO VOTE RECORDED: Grove
SENATE LOCAL GOVERNMENT COMMITTEE: 7-0, 4/22/26
AYES: Durazo, Choi, Arreguín, Ashby, Cervantes, Laird, Seyarto
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SENATE FLOOR: 35-1, 5/18/26
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Ochoa Bogh, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson
NOES: Wiener
NO VOTE RECORDED: Becker, Jones, Niello, Padilla
ASSEMBLY FLOOR: 79-0, 8/26/26 - See last page for vote
SUBJECT: Water supply planning: housing developments
SOURCE: East Bay Municipal Water District
DIGEST:
Restores a requirement that cities and counties approving certain projects identify a water system that would supply water for that project and complete a water supply assessment (WSA).
Assembly Amendments
match the definition of “project” to the definition in existing law and state a WSA is only subject to judicial review when it is being challenged as part of a city or county’s certification of an environmental impact report, or adoption of a negative declaration or mitigated negative declaration, for a housing development project or when it’s being challenged as part of a non-housing development project.
ANALYSIS:
Existing law:
- Requires cities and counties that determine a project is subject to the California Environmental Quality Act (CEQA) to comply with certain water supply planning requirements.
- Defines, for purposes of water supply planning, a “project” as any proposed:
- Residential development of more than 500 dwelling units.
- Shopping center or business establishment employing more than 1,000 persons or having more than 500,000 square feet of floor space.
- Commercial office building employing more than 1,000 persons or having more than 250,000 square feet of floor space.
- Hotel or motel, or both, having more than 500 rooms.
- Industrial, manufacturing, or processing plant, or industrial park planned to house more than 1,000 persons, occupying more than 40 acres of land, or having more than 650,000 square feet of floor area.
- Mixed-use project that includes one or more of the above-described projects.
- Project that would demand an amount of water equal to, or greater than, the amount of water required by a 500 dwelling unit project.
- Residential, business, commercial, hotel or motel, industrial development or mixed use development that would – where a public water system has fewer than 5,000 service connections – increase the number of service connections by 10% percent or more.
- Requires the city or county to identify a water system to serve a proposed project and if one isn’t identifiable, the city or county must prepare a WSA.
- Exempts from CEQA – and by extension, from the requirement to prepare a WSA – a number of development projects listed in (2) above.
This bill:
- Requires a city or county to identify a water system that will serve a project and requires that water system – or the city or county if no water system is identified – to prepare a WSA once:
- An applicant submits a preliminary application for a housing development project that meets certain conditions, including that the project not be larger than 20 acres; or
- The county or city determines a development project application is completed and does not meet the conditions of (a).
- Requires the city or county, within 15 days of the application, to request the public water system to determine if the water demand of the project was included in the most recent urban water management plan (UWMP).
- Develops an expedited timeline of 45 days to complete a WSA for projects that comply with (1)(a) above or are affordable housing projects. Also allows the city or county to seek a writ of mandamus to compel the public water system to submit the WSA if it fails to do so.
- Determines the WSA is an informational document and not a final agency action subject to judicial review except when:
- A challenge is made to a city or county's CEQA documentation for a housing development project that is a WSA project; or
- A challenge is made to a city or county's approval or disapproval of a WSA project that is not a housing development project.
- States it does subject a project to:
- Discretionary review by a city or county if the project is required to be permitted ministerially; or
- The requirements of the CEQA if the project is exempt from CEQA.
Background\
“Show Me The … Water.” California's efforts to better align development decisions with available water resources stem largely from two statutes enacted in 2001. The laws were adopted in response to concerns that local governments were approving development projects without adequately considering whether sufficient water supplies existed to support those projects. The two 2001 measures established new requirements to integrate water supply considerations into the land use approval process.
The trigger for a city or county to request a WSA from a water supplier (or do it themselves) is when it determines certain large-scale projects are also subject to CEQA. A WSA requires any existing water supply entitlements, water rights, or relevant water service contracts to be identified for the proposed project, and a description of the amount of water received in prior years by the public water system or the city or county through its water rights or other sources. The WSA must be completed within 90 days of the request by the city or county, though the water system may request a 30-day extension. Once completed, the WSA must be incorporated into project’s CEQA analysis.
Feeling The Need For Speed, But Not Water? In an effort to speed up the permitting process, the Legislature has enacted various CEQA exemptions and converted certain projects to only require ministerial approval from a local government over the past several years. Last year, SB 131 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2025) and AB 130 (Committee on Budget, Chapter 22, Statutes of 2025) created several new CEQA exemptions. As noted above, a city or county is required to initiate a WSA request once it determines what kind of CEQA documentation is needed for that project. The enactment of SB 131 and AB 130 exempted many projects, such as advanced manufacturing facilities, maintenance facilities for electrically powered high-speed rail, and certain larger housing development projects, from not just CEQA but also from the water planning requirements in law.
Comments
- Purpose of the bill: According to the author, the bill “… restores an important, long-standing safeguard on water availability for large new developments that was inadvertently circumvented through recent legislation. For more than two decades, state law has required [WSAs] for certain large development projects to strengthen the link between land use planning and water supply planning. These assessments ensure that local governments have a clear, forward-looking understanding of whether sufficient water supplies exist to serve new development alongside existing and planned uses over a 20-year horizon.
“In recent years, the Legislature has appropriately focused on removing barriers to housing development, including through CEQA streamlining and exemptions. However, because WSAs are currently triggered by CEQA, these changes have had the unintended effect of removing this key planning tool for projects that still meet large development thresholds. Without a WSA, cities and counties may lack critical information about water demand and long-term supply reliability.
“At a time when climate change is increasing pressure on California's water systems, [this bill] ensures that this proven planning tool remains in place to support informed decision-making and sustainable growth.”
- Keep Your CEQA Exemption, But Not Your Water Planning Exemption. The bill does not reverse the CEQA exemptions granted to certain projects under last year’s SB 131 and AB 130. However, it does make it clear that projects benefitting from those CEQA exemptions do have to comply with the water planning laws that applied to them prior to the exemptions being created.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee, the bill imposes a state-mandated local program, but these costs are not state-reimbursable.
SUPPORT: (Verified 8/27/26)
East Bay Municipal Utilities District (source)
American Planning Association, California Chapter
Association of California Water Agencies (ACWA)
California Building Industry Association
California Coastkeeper Alliance
California Environmental Voters
California Farm Bureau
California Municipal Utilities Association
California Special Districts Association
California State Association of Counties (CSAC)
California Water Association
City of Sacramento
City of Sacramento Department of Utilities
Clean Earth 4 Kids
Clean Water Action California
Community Water Center
Community Alliance With Family Farmers
Contra Costa Water District
Defenders of Wildlife
Friends of the River
Irvine Ranch Water District
Las Virgenes Municipal Water District
Leadership Counsel for Justice & Accountability
Mono Lake Committee
Olivenhain Municipal Water District
Planning and Conservation League
Rancho California Water District
Regional Water Authority
San Francisco Baykeeper
San Joaquin Valley Water Collaborative Action Program
Santa Clara Valley Water District
Sierra Club California
State Building & Construction Trades Council of California
Trout Unlimited
Unite Here International Union, Afl-cio
Valley Water
Western Municipal Water District
Wholly H2O
OPPOSITION: (Verified 8/27/26)
None received.
ASSEMBLY FLOOR: 79-0 8/26/26
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Castillo, Chen, Connolly, Davies, DeMaio, Dixon, Elhawary, Ellis, Flora, Fong, Gabriel, Garcia, Gipson, Jeff Gonzalez, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Johnson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Sanchez, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ta, Tangipa, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
Prepared by: Evan Goldberg / N.R. & W. / (916) 651-4116
8/27/26 10:34:19
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 1085 |
UNFINISHED BUSINESS
Bill No: SB 1085
Author: Durazo (D), et al.
Amended: 8/19/26
Vote: 21
SENATE NATURAL RES. & WATER COMMITTEE: 6-0, 4/14/26
AYES: Becker, Seyarto, Allen, Cabaldon, Cortese, Stern
NO VOTE RECORDED: Grove
SENATE LOCAL GOVERNMENT COMMITTEE: 7-0, 4/22/26
AYES: Durazo, Choi, Arreguín, Ashby, Cervantes, Laird, Seyarto
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SENATE FLOOR: 35-1, 5/18/26
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Ochoa Bogh, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson
NOES: Wiener
NO VOTE RECORDED: Becker, Jones, Niello, Padilla
ASSEMBLY FLOOR: Passed, 8/26/26
SUBJECT: Water supply planning: housing developments
SOURCE: East Bay Municipal Water District
DIGEST:
Restores a requirement that cities and counties approving certain projects identify a water system that would supply water for that project and complete a water supply assessment (WSA).
Assembly Amendments
match the definition of “project” to the definition in existing law and state a WSA is only subject to judicial review when it is being challenged as part of a city or county’s certification of an environmental impact report, or adoption of a negative declaration or mitigated negative declaration, for a housing development project or when it’s being challenged as part of a non-housing development project.
ANALYSIS:
Existing law:
- Requires cities and counties that determine a project is subject to the California Environmental Quality Act (CEQA) to comply with certain water supply planning requirements.
- Defines, for purposes of water supply planning, a “project” as any proposed:
- Residential development of more than 500 dwelling units.
- Shopping center or business establishment employing more than 1,000 persons or having more than 500,000 square feet of floor space.
- Commercial office building employing more than 1,000 persons or having more than 250,000 square feet of floor space.
- Hotel or motel, or both, having more than 500 rooms.
- Industrial, manufacturing, or processing plant, or industrial park planned to house more than 1,000 persons, occupying more than 40 acres of land, or having more than 650,000 square feet of floor area.
- Mixed-use project that includes one or more of the above-described projects.
- Project that would demand an amount of water equal to, or greater than, the amount of water required by a 500 dwelling unit project.
- Residential, business, commercial, hotel or motel, industrial development or mixed use development that would – where a public water system has fewer than 5,000 service connections – increase the number of service connections by 10% percent or more.
- Requires the city or county to identify a water system to serve a proposed project and if one isn’t identifiable, the city or county must prepare a WSA.
- Exempts from CEQA – and by extension, from the requirement to prepare a WSA – a number of development projects listed in (2) above.
This bill:
- Requires a city or county to identify a water system that will serve a project and requires that water system – or the city or county if no water system is identified – to prepare a WSA once:
- An applicant submits a preliminary application for a housing development project that meets certain conditions, including that the project not be larger than 20 acres; or
- The county or city determines a development project application is completed and does not meet the conditions of (a).
- Requires the city or county, within 15 days of the application, to request the public water system to determine if the water demand of the project was included in the most recent urban water management plan (UWMP).
- Develops an expedited timeline of 45 days to complete a WSA for projects that comply with (1)(a) above or are affordable housing projects. Also allows the city or county to seek a writ of mandamus to compel the public water system to submit the WSA if it fails to do so.
- Determines the WSA is an informational document and not a final agency action subject to judicial review except when:
- A challenge is made to a city or county's CEQA documentation for a housing development project that is a WSA project; or
- A challenge is made to a city or county's approval or disapproval of a WSA project that is not a housing development project.
- States it does subject a project to:
- Discretionary review by a city or county if the project is required to be permitted ministerially; or
- The requirements of the CEQA if the project is exempt from CEQA.
Background\
“Show Me The … Water.” California's efforts to better align development decisions with available water resources stem largely from two statutes enacted in 2001. The laws were adopted in response to concerns that local governments were approving development projects without adequately considering whether sufficient water supplies existed to support those projects. The two 2001 measures established new requirements to integrate water supply considerations into the land use approval process.
The trigger for a city or county to request a WSA from a water supplier (or do it themselves) is when it determines certain large-scale projects are also subject to CEQA. A WSA requires any existing water supply entitlements, water rights, or relevant water service contracts to be identified for the proposed project, and a description of the amount of water received in prior years by the public water system or the city or county through its water rights or other sources. The WSA must be completed within 90 days of the request by the city or county, though the water system may request a 30-day extension. Once completed, the WSA must be incorporated into project’s CEQA analysis.
Feeling The Need For Speed, But Not Water? In an effort to speed up the permitting process, the Legislature has enacted various CEQA exemptions and converted certain projects to only require ministerial approval from a local government over the past several years. Last year, SB 131 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2025) and AB 130 (Committee on Budget, Chapter 22, Statutes of 2025) created several new CEQA exemptions. As noted above, a city or county is required to initiate a WSA request once it determines what kind of CEQA documentation is needed for that project. The enactment of SB 131 and AB 130 exempted many projects, such as advanced manufacturing facilities, maintenance facilities for electrically powered high-speed rail, and certain larger housing development projects, from not just CEQA but also from the water planning requirements in law.
Comments
- Purpose of the bill: According to the author, the bill “… restores an important, long-standing safeguard on water availability for large new developments that was inadvertently circumvented through recent legislation. For more than two decades, state law has required [WSAs] for certain large development projects to strengthen the link between land use planning and water supply planning. These assessments ensure that local governments have a clear, forward-looking understanding of whether sufficient water supplies exist to serve new development alongside existing and planned uses over a 20-year horizon.
“In recent years, the Legislature has appropriately focused on removing barriers to housing development, including through CEQA streamlining and exemptions. However, because WSAs are currently triggered by CEQA, these changes have had the unintended effect of removing this key planning tool for projects that still meet large development thresholds. Without a WSA, cities and counties may lack critical information about water demand and long-term supply reliability.
“At a time when climate change is increasing pressure on California's water systems, [this bill] ensures that this proven planning tool remains in place to support informed decision-making and sustainable growth.”
- Keep Your CEQA Exemption, But Not Your Water Planning Exemption. The bill does not reverse the CEQA exemptions granted to certain projects under last year’s SB 131 and AB 130. However, it does make it clear that projects benefitting from those CEQA exemptions do have to comply with the water planning laws that applied to them prior to the exemptions being created.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee, the bill imposes a state-mandated local program, but these costs are not state-reimbursable.
SUPPORT: (Verified 8/24/26)
East Bay Municipal Utilities District (source)
American Planning Association, California Chapter
Association of California Water Agencies (ACWA)
California Building Industry Association
California Coastkeeper Alliance
California Environmental Voters
California Farm Bureau
California Municipal Utilities Association
California Special Districts Association
California State Association of Counties (CSAC)
California Water Association
City of Sacramento
City of Sacramento Department of Utilities
Clean Earth 4 Kids
Clean Water Action California
Community Water Center
Community Alliance With Family Farmers
Contra Costa Water District
Defenders of Wildlife
Friends of the River
Irvine Ranch Water District
Las Virgenes Municipal Water District
Leadership Counsel for Justice & Accountability
Mono Lake Committee
Olivenhain Municipal Water District
Planning and Conservation League
Rancho California Water District
Regional Water Authority
San Francisco Baykeeper
San Joaquin Valley Water Collaborative Action Program
Santa Clara Valley Water District
Sierra Club California
State Building & Construction Trades Council of California
Trout Unlimited
Unite Here International Union, Afl-cio
Valley Water
Western Municipal Water District
Wholly H2O
OPPOSITION: (Verified 8/24/26)
Abundant Housing Los Angeles
California Council for Affordable Housing
California YIMBY
Prepared by: Evan Goldberg / N.R. & W. / (916) 651-4116
8/26/26 15:34:30
**** END ****
SENATE THIRD READING
STR Bill Id:SB 1085
Author:(Durazo)
As Amended Ver:August 19, 2026
Majority vote
SUMMARY
Restores the requirement that cities and counties approving certain projects identify a water system that would supply water for that project and require the completion of a water supply assessment (WSA).
Major Provisions
- Requires a city or county to identify a water system that will serve a project (as defined in Water Code Section 10912; a WSA project) and requires that water system to prepare a WSA, or if a water system cannot be identified to serve a project, requires the city or county to prepare a WSA once one of the following occurs:
- An applicant submits to the city or county a preliminary application for a housing development project that meets certain conditions, including that the project not be larger than 20 acres; or
- The county or city determines that a development project application is completed and does not meet the conditions of (a).
- Requires the city or county, within 15 days of the application, to request the public water system to determine if the water demand of the project was included in the most recent urban water management plan (UWMP).
- Develops an expedited timeline of 45 days for the completion of WSAs for projects that meet the condition of #1a, above, or other affordable housing projects. Further, allows the city or county to seek a writ of mandamus to compel the public water system to submit the WSA if they fail to do so.
- Determines that the WSA is an informational document and not a final agency action subject to judicial review except as apart of either of the following:
- A challenge to a city or county's California Environmental Quality Act (CEQA) documentation for a housing development project that is a WSA project; or
- A challenge to a city or county's approval or disapproval of a WSA project that is not a housing development project.
- States that this statute shall not be construed to subject a project to either of the following:
- Discretionary review by a city or county if the project is required to be permitted ministerially; or
- The requirements of the CEQA if the project is otherwise exempt.
- States that no reimbursement is required by this bill pursuant to the Constitution.
COMMENTS
California's efforts to better align development decisions with available water resources stem largely from two statutes enacted 25 years ago: SB 610 (Costa), Chapter 643, Statutes of 2001 and SB 221 (Kuehl), Chapter 642, Statutes of 2001. These measures were adopted in response to concerns that local governments were approving growth and development without adequately considering whether sufficient water supplies existed to support those projects. Collectively known as the "show-me-the-water" laws, the statutes established new requirements intended to integrate water supply considerations into the land use approval process.
These statutes created a framework that requires coordination between local planning agencies and water suppliers. The goal is to ensure that water availability is considered as part of development planning rather than after land use decisions have already been made. SB 221 applies later in the development process and requires confirmation of an adequate water supply before approval of certain residential subdivision maps under the Subdivision Map Act. SB 610, on the other hand, focuses on the earlier environmental review phase of project approval and requires preparation of a WSA for specified residential, commercial, and industrial developments so that water availability is evaluated before key planning decisions are made.
The trigger for a city or county to request a WSA from a water supplier (or do it themselves) is the determination that certain large-scale projects are also subject to CEQA (note: not all CEQA "projects" are WSA "projects"; see Water Code Section 10912). A WSA requires the identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and a description of the quantities of water received in prior years by the public water system or the city or county through its water rights or other sources. The WSA must be completed within 90 days of the request by the city or county, but the water system may request a 30-day extension. Once completed, the WSA must be incorporated into the analysis of the project under CEQA.
When preparing a WSA, an urban water supplier is able to use the assessment included in an UWMP. UWMPs are required of urban water suppliers who serve more than 3,000 customers and are required to contain an assessment of the reliability of water sources over the next 20 years, a description of demand management measures, a water shortage contingency plan, and a discussion of the use and planned use of recycled water. Although the UWMP may be valuable analysis for preparing a WSA, not all water suppliers are required to develop a UWMP, and even water suppliers with a UWMP may not have foreseen the scale or demand on their water supply. By examining potential supply constraints early in the approval process, WSAs can help developers, local governments, and water providers address water-related challenges before they become obstacles to project implementation.
Over the past several years, the Legislature has enacted various CEQA exemptions and ministerial approvals to "speed up" the permitting process and reduce litigation risk for various types of development projects that meet specified requirements, including ministerial approvals for housing developments and CEQA exemptions for housing, commercial, and industrial developments.
Most recently, the Legislature enacted SB 131 (Committee on Budget and Fiscal Review), Chapter 24, Statutes of 2025 and AB 130 (Committee on Budget) Chapter 22, Statutes of 2025). SB 131, which provided numerous CEQA exemptions. As noted above, a city or county is required to initiate a WSA request once it determines what kind of CEQA documentation is needed for that project. However, with the enactment of SB 131 and AB 130, many projects that were previously subject to CEQA, such as advanced manufacturing facilities, maintenance facilities for electrically powered high-speed rail, or certain larger housing development projects, are now exempt. Although there have been numerous CEQA exemptions before these bills, the exemptions within these bills are significantly broader than other infill exemptions because they apply to larger sites (up to 20 acres) and include fewer conditions to qualify. Because a city or county is no longer required to determine the appropriate environmental review document for these projects, it does not activate the requirement to identify the water systems that may supply water for the project. It is likely that the Legislature was unaware of this consequence at the time, considering how valuable the WSA is to local water suppliers.
According to the Author
"[This bill] restores an important, long-standing safeguard on water availability for large new developments that was inadvertently circumvented through recent legislation. For more than two decades, state law has required [WSAs] for certain large development projects to strengthen the link between land use planning and water supply planning. These assessments ensure that local governments have a clear, forward-looking understanding of whether sufficient water supplies exist to serve new development alongside existing and planned uses over a 20-year horizon.
Because WSAs have been a consistent part of California's planning framework, communities have largely been able to rely on the expectation that growth would be supported by real, available water supplies. That was not always the case. Prior to these requirements, reliance on "paper water" contributed to serious consequences in some regions, particularly in the Central Valley, where communities experienced water shortages so severe that residents had to rely on bottled water for basic needs.
In recent years, the Legislature has appropriately focused on removing barriers to housing development, including through CEQA streamlining and exemptions. However, because WSAs are currently triggered by CEQA, these changes have had the unintended effect of removing this key planning tool for projects that still meet large development thresholds. Without a WSA, cities and counties may lack critical information about water demand and long-term supply reliability.
At a time when climate change is increasing pressure on California's water systems, [this bill] ensures that this proven planning tool remains in place to support informed decision-making and sustainable growth."
Arguments in Support
A coalition of water agencies and water-concerned organizations write that this bill "restores an important safeguard on water availability for new large developments that was inadvertently circumvented through recent legislation." The supporters share the benefits of linking land use and water supply through the WSA and the value of this early coordination. They note that a WSA is an "important tool for ensuring that new large developments have a long-term water supply, which is critical in light of the impacts that climate change and future droughts could have on areas throughout the state."
Arguments in Opposition
None on file.
FISCAL COMMENTS
According to the Assembly Appropriations Committee, "By imposing additional duties on a city or county, the bill imposes a state-mandated local program. However, these local costs are not state-reimbursable because local agencies have general authority to charge and adjust planning and permitting fees to offset any increased local costs associated with the bill."
VOTES
SENATE FLOOR: 35-1-4
YES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Ochoa Bogh, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson
NO: Wiener
ABS, ABST OR NV: Becker, Jones, Niello, Padilla
ASM WATER, PARKS, AND WILDLIFE: 11-0-1
YES: Papan, Jeff Gonzalez, Alanis, Alvarez, Ávila Farías, Bennett, Boerner, Caloza, Hart, Celeste Rodriguez, Rogers
ABS, ABST OR NV: Bains
ASM LOCAL GOVERNMENT: 10-0-0
YES: Carrillo, Ta, Johnson, Pacheco, Ramos, Ransom, Blanca Rubio, Stefani, Ward, Wilson
ASM APPROPRIATIONS: 15-0-0
YES: Wicks, Hoover, Arambula, Calderon, Caloza, Dixon, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache, Ta, Tangipa
UPDATED
VERSION: August 19, 2026
CONSULTANT: Stephanie Mitchell / W., P., & W. / (916) 319-2096 FN: 0003810
SENATE THIRD READING
STR Bill Id:SB 1085
Author:(Durazo)
As Amended Ver:June 17, 2026
Majority vote
SUMMARY
Restores the requirement that cities and counties approving certain projects identify a water system that would supply water for that project and require the completion of a water supply assessment (WSA).
Major Provisions
- Requires a city or county to identify a water system that will serve a project (as defined in Water Code Section 10912) and requires that water system to prepare a WSA, or if a water system cannot be identified to serve a project, requires the city or county to prepare a WSA once one of the following occurs:
- An applicant submits to the city or county a preliminary application for a housing development project that meets certain conditions, including that the project not be larger than 20 acres; or
- The county or city determines that a development project application is completed and does not meet the conditions of (a).
- Requires the city or county, within 15 days of the application, to request the public water system to determine if the water demand of the project was included in the most recent urban water management plan (UWMP).
- Develops an expedited timeline of 45 days for the completion of WSAs for projects that meet the condition of #1a, above, or other affordable housing projects. Further, allows the city or county to seek a writ of mandamus to compel the public water system to submit the WSA if they fail to do so.
- Determines that the WSA is an informational document and not a final agency action subject to judicial review except as apart of either of the following:
- A challenge to a city or county's California Environmental Quality Act (CEQA) documentation for a housing development project; or
- A challenge to a city or county's approval or disapproval of a WSA project that is not a housing development project.
- States that this statute shall not be construed to subject a project to either of the following:
- Discretionary review by a city or county if the project is required to be permitted ministerially; or
- The requirements of the CEQA if the project is otherwise exempt.
- States that no reimbursement is required by this bill pursuant to the Constitution.
- Makes other conforming changes.
COMMENTS
California's efforts to better align development decisions with available water resources stem largely from two statutes enacted 25 years ago: SB 610 (Costa, Chapter 643, Statutes of 2001) and SB 221 (Kuehl, Chapter 642, Statutes of 2001). These measures were adopted in response to concerns that local governments were approving growth and development without adequately considering whether sufficient water supplies existed to support those projects. Collectively known as the "show-me-the-water" laws, the statutes established new requirements intended to integrate water supply considerations into the land use approval process.
These statutes created a framework that requires coordination between local planning agencies and water suppliers. The goal is to ensure that water availability is considered as part of development planning rather than after land use decisions have already been made. SB 221 applies later in the development process and requires confirmation of an adequate water supply before approval of certain residential subdivision maps under the Subdivision Map Act. SB 610, on the other hand, focuses on the earlier environmental review phase of project approval and requires preparation of a WSA for specified residential, commercial, and industrial developments so that water availability is evaluated before key planning decisions are made.
The trigger for a city or county to request a WSA from a water supplier (or do it themselves) is the determination that certain large-scale projects are also subject to CEQA (note: not all CEQA "projects" are WSA "projects"; see Water Code Section 10912). A WSA requires the identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and a description of the quantities of water received in prior years by the public water system or the city or county through its water rights or other sources. The WSA must be completed within 90 days of the request by the city or county, but the water system may request a 30-day extension. Once completed, the WSA must be incorporated into the analysis of the project under CEQA.
When preparing a WSA, an urban water supplier is able to use the assessment included in an UWMP. UWMPs are required of urban water suppliers who serve more than 3,000 customers and are required to contain an assessment of the reliability of water sources over the next 20 years, a description of demand management measures, a water shortage contingency plan, and a discussion of the use and planned use of recycled water. Although the UWMP may be valuable analysis for preparing a WSA, not all water suppliers are required to develop a UWMP, and even water suppliers with a UWMP may not have foreseen the scale or demand on their water supply. By examining potential supply constraints early in the approval process, WSAs can help developers, local governments, and water providers address water-related challenges before they become obstacles to project implementation.
Over the past several years, the Legislature has enacted various CEQA exemptions and ministerial approvals to "speed up" the permitting process and reduce litigation risk for various types of development projects that meet specified requirements, including ministerial approvals for housing developments and CEQA exemptions for housing, commercial, and industrial developments.
Most recently, the Legislature enacted SB 131 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2025) and AB 130 (Committee on Budget, Chapter 22, Statutes of 2025). SB 131, which provided numerous CEQA exemptions. As noted above, a city or county is required to initiate a WSA request once it determines what kind of CEQA documentation is needed for that project. However, with the enactment of SB 131 and AB 130, many projects that were previously subject to CEQA, such as advanced manufacturing facilities, maintenance facilities for electrically powered high-speed rail, or certain larger housing development projects, are now exempt. Although there have been numerous CEQA exemptions before these bills, the exemptions within these bills are significantly broader than other infill exemptions because they apply to larger sites (up to 20 acres) and include fewer conditions to qualify. Because a city or county is no longer required to determine the appropriate environmental review document for these projects, it does not activate the requirement to identify the water systems that may supply water for the project. It is likely that the Legislature was unaware of this consequence at the time, considering how valuable the WSA is to local water suppliers.
According to the Author
"[This bill] restores an important, long-standing safeguard on water availability for large new developments that was inadvertently circumvented through recent legislation. For more than two decades, state law has required [WSAs] for certain large development projects to strengthen the link between land use planning and water supply planning. These assessments ensure that local governments have a clear, forward-looking understanding of whether sufficient water supplies exist to serve new development alongside existing and planned uses over a 20-year horizon.
Because WSAs have been a consistent part of California's planning framework, communities have largely been able to rely on the expectation that growth would be supported by real, available water supplies. That was not always the case. Prior to these requirements, reliance on "paper water" contributed to serious consequences in some regions, particularly in the Central Valley, where communities experienced water shortages so severe that residents had to rely on bottled water for basic needs.
In recent years, the Legislature has appropriately focused on removing barriers to housing development, including through CEQA streamlining and exemptions. However, because WSAs are currently triggered by CEQA, these changes have had the unintended effect of removing this key planning tool for projects that still meet large development thresholds. Without a WSA, cities and counties may lack critical information about water demand and long-term supply reliability.
At a time when climate change is increasing pressure on California's water systems, [this bill] ensures that this proven planning tool remains in place to support informed decision-making and sustainable growth."
Arguments in Support
A coalition of water agencies and water-concerned organizations write that this bill "restores an important safeguard on water availability for new large developments that was inadvertently circumvented through recent legislation." The supporters share the benefits of linking land use and water supply through the WSA and the value of this early coordination. They note that a WSA is an "important tool for ensuring that new large developments have a long-term water supply, which is critical in light of the impacts that climate change and future droughts could have on areas throughout the state."
Arguments in Opposition
According to Fieldstead and Company on a previous version of this bill, "Under existing law, the WSA requirement is conditioned on a project being subject to CEQA. As a result, projects exempt from CEQA pursuant to AB 130 or SB 131 or projects approved ministerially under SB 35, SB 423, or AB 2011, do not trigger a WSA. SB 1085 would change that by requiring WSAs for all projects subject to Water Code Section 10910, regardless of CEQA status. By tying that WSA requirement to the existing CEQA process, the bill effectively brings back CEQA-style legal challenges for projects the Legislature had already exempted. This exposes infill housing to lawsuits it would otherwise avoid. Moreso, even weak cases would cause delays, add costs, and create uncertainty to projects. As a consequence, this will lead to fewer homes and higher rents in California."
FISCAL COMMENTS
By imposing additional duties on a city or county, the bill imposes a state-mandated local program. However, these local costs are not state-reimbursable because local agencies have general authority to charge and adjust planning and permitting fees to offset any increased local costs associated with the bill.
VOTES
SENATE FLOOR: 35-1-4
YES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Ochoa Bogh, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson
NO: Wiener
ABS, ABST OR NV: Becker, Jones, Niello, Padilla
ASM WATER, PARKS, AND WILDLIFE: 11-0-1
YES: Papan, Jeff Gonzalez, Alanis, Alvarez, Ávila Farías, Bennett, Boerner, Caloza, Hart, Celeste Rodriguez, Rogers
ABS, ABST OR NV: Bains
ASM LOCAL GOVERNMENT: 10-0-0
YES: Carrillo, Ta, Johnson, Pacheco, Ramos, Ransom, Blanca Rubio, Stefani, Ward, Wilson
ASM APPROPRIATIONS: 15-0-0
YES: Wicks, Hoover, Arambula, Calderon, Caloza, Dixon, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache, Ta, Tangipa
UPDATED
VERSION: June 17, 2026
CONSULTANT: Stephanie Mitchell / W., P., & W. / (916) 319-2096 FN: 0003375
Date of Hearing: August 5, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 1085
Author:(Durazo) – As Amended Ver:June 17, 2026
Policy Committee: | Water, Parks and Wildlife | Vote: | 11 - 0 |
Local Government | 10 - 0 | ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill restores a requirement that cities and counties approving certain projects identify a water system that may supply water for that project and require the completion of a water supply assessment (WSA).
Specifically, this bill, among other things:
- Requires a city or county to comply with specified water supply planning requirements when either of the following occurs:
- An applicant submits to the city or county a preliminary application for a housing development project that meets the conditions for a specified California Environmental Quality Act (CEQA) exemption.
- For a specified project that does not meet the conditions of item a, above, the city or county determines a development application is complete or deemed complete, as specified.
- Requires a city or county, upon receipt of an application that meets the criteria of item 1, above, to identify any water system that meets certain conditions that may supply water for the project, as specified.
- Requires the city or county, within 15 days of receipt of an application that meets the criteria of item 1, above, to request each identified public water system to determine whether the projected water demand associated with the proposed project was included in the most recent urban water management plan.
- For specified housing development projects, requires the public water system to submit the WSA to the city or county no later than 45 days from the date the request was received; specifies that the governing body of each public water system, or the city or county, if either is required to comply with water supply planning requirements, is not required to approve the WSA at a public meeting; and authorizes the city or county to seek a writ of mandamus to compel the public water system to comply with the water supply planning requirements if the public water system fails to submit the WSA.
- States that a WSA is an informational document and not a final agency action subject to judicial review, except as specified.
- States that this statute shall not be construed to subject a project to either (a) discretionary review by a city or county if the project is required to be permitted ministerially or (b) the requirements of CEQA if the project is otherwise exempt pursuant to any other law.
FISCAL EFFECT:
By imposing additional duties on a city or county, the bill imposes a state-mandated local program. However, these local costs are not state-reimbursable because local agencies have general authority to charge and adjust planning and permitting fees to offset any increased local costs associated with the bill.
COMMENTS:
1) Purpose. According to the author:
In recent years, the Legislature has appropriately focused on removing barriers to housing development, including through CEQA streamlining and exemptions. However, because WSAs are currently triggered by CEQA, these changes have had the unintended effect of removing this key planning tool for projects that still meet large development thresholds. Without a WSA, cities and counties may lack critical information about water demand and long-term supply reliability.
2) Background. This bill is sponsored by the East Bay Municipal Water District (EBMUD), which sponsored legislation almost 25 years ago to link land use planning with water supply planning. As described by EBMUD, a WSA – which is required for certain types of large residential, commercial, and mixed-use projects – presents an opportunity for early coordination between a water supplier, land use entity, and a developer to help ensure a reliable, long-term water supply and the construction of the necessary infrastructure to support new developments.
Under current law, a city or county, upon determining that a project is subject to CEQA, must request a WSA from a water supplier if the development meets the definition of “project” contained in the Water Code. While the Water Code defines which projects require a WSA, the WSA is triggered when the city or county determines that the project is subject to CEQA review.
Over the past several years, the Legislature has enacted various CEQA exemptions and ministerial approvals to speed up the permitting process and reduce litigation risk for various types of development projects that meet specified requirements, including ministerial approvals for housing developments and CEQA exemptions for housing, commercial, and industrial developments. Most recently, with the enactment of SB 131 (Committee on Budget and Fiscal Review), Chapter 24, Statutes of 2025, and AB 130 (Committee on Budget) Chapter 22, Statutes of 2025, many projects that were previously subject to CEQA are now exempt. EBMUD writes, “Those successful legislative efforts meant that a WSA was no longer required for projects that still met the Water Code criteria but were no longer subject to CEQA.”
This bill ensures that regardless of whether a project is subject to CEQA review, any large residential, commercial, or mixed-use project that meets the definition of “project” contained in WSA law triggers the requirement for a WSA to be completed.
There is no registered opposition registered to this bill.
Analysis Prepared by: Nikita Koraddi / APPR. / (916) 319-2081
Date of Hearing: July 1, 2026
ASSEMBLY COMMITTEE ON LOCAL GOVERNMENT
Juan Carrillo, Chair
SBPCA Bill Id:SB 1085
Author:(Durazo) – As Amended Ver:June 17, 2026
SENATE VOTE: 35-1
SUBJECT: Water supply planning: housing developments.
SUMMARY: Restores the requirement that cities and counties approving certain projects identify a water system that would supply water for that project and require the completion of a water supply assessment (WSA). Specifically, this bill:
- Provides that any city or county shall comply with specified WSA requirements when either of the following occurs:
- An applicant submits to the city or county a preliminary application for a housing development project that meets certain conditions for a California Environmental Quality Act (CEQA) exemption.
- For a project, as defined for purposes of the water supply planning, when the city or county deems a development application complete.
- Requires the city or county, within 15 days of receipt of the application, instead of upon making a CEQA determination as in current law, to request the public water system to determine whether the projected water demand associated with a proposed project was included as part of the most recent urban water management plan (UWMP).
- Specifies that for a project that meets the conditions of a) of 1), above, or other affordable specified housing projects, the public water system shall submit the WSA to the city or county no later than 45 days from the date that the request was received.
- Provides that the governing body of each public water system, or the city or county if they are responsible for preparing the WSA, shall not be required to approve the WSA at a public meeting.
- Specifies that, if the public water system fails to submit the assessment, the city or county may seek a writ of mandamus to compel the public water system to submit the WSA.
- Provides that a WSA is an informational document and not a final agency action subject to judicial review except as part of either of the following:
- A challenge to a city or county’s certification of an environmental impact report (EIR), or adoption of a negative declaration (ND) or mitigated ND, for a housing development project, as defined.
- A challenge to a city or county’s approval or disapproval of a project, as defined, that is not a housing development project, as defined.
- Specifies that nothing in this bill shall be construed to do either of the following:
- Subject a project to discretionary review by a city or county if the project is required to be permitted ministerially pursuant to state law, as specified.
- Subject a project to the requirements of CEQA if the project is otherwise exempt pursuant to any other law.
- Makes numerous technical and conforming changes.
- Provides that no reimbursement is required by this bill because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this bill.
EXISTING LAW:
- Requires any city or county with a project as defined in 3), below, that is subject to CEQA to identify any water system whose service area includes, or is adjacent to, the project that may provide water supply for the project at the time the city or county is developing an EIR, ND, or mitigated ND under CEQA (Water Code § 10910). Further,
- Requires a city or county, when determining whether an EIR, ND, or mitigated ND is needed for a project, to request each public water system to determine whether the projected water demand associated with the proposed project was included as a part of the most recently adopted UWMP.
- Allows, if the water demand was accounted for in the UWMP, the public water system to incorporate the information from the UWMP into the WSA.
- Requires, if the water demand was not accounted for in the UWMP or there is no UWMP, the WSA to include a discussion of whether there is sufficient water supply available considering current and projected water demand for the next 20 years.
- Allows, if the water demand was accounted for in the UWMP, the public water system to incorporate the information from the UWMP into the WSA.
- Requires, if a public water system cannot be identified, the city or county to prepare the WSA.
- Requires a city or county, when determining whether an EIR, ND, or mitigated ND is needed for a project, to request each public water system to determine whether the projected water demand associated with the proposed project was included as a part of the most recently adopted UWMP.
- Requires a WSA to include identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and, if a public water system is preparing the WSA, a description of the quantities of water received in prior years (Water Code § 10910).
- Defines a “project” to mean any of the following (Water Code § 10912):
- A proposed residential development of more than 500 dwelling units.
- A proposed shopping center or business establishment employing more than 1,000 persons or having more than 500,000 square feet of floor space.
- A proposed commercial office building employing more than 1,000 persons or having more than 250,000 square feet of floor space.
- A proposed hotel or motel, or both, having more than 500 rooms.
- A proposed industrial, manufacturing, or processing plant, or industrial park planned to house more than 1,000 persons, occupying more than 40 acres of land, or having more than 650,000 square feet of floor area.
- A mixed-use project that includes one or more of the projects, as specified.
- A project that would demand an amount of water equivalent to, or greater than, the amount of water required by a 500-dwelling unit project.
- A project that would account for an increase of 10% or more of a public water system’s connections, if that public water system has fewer than 5,000 service connections.
- A proposed residential development of more than 500 dwelling units.
- Establishes the Urban Water Management Planning Act that, among other things, requires an urban water supplier to prepare and adopt an UWMP, which includes a description of how much water the supplier has on a reliable basis, how much it needs for the foreseeable future, what the agency’s strategy is for meeting its water needs, the challenges facing the agency, and any other information necessary to provide a general understanding of the agency’s plan. Requires a UWMP to be updated at least once every five years (Water Code § 10610 et seq.).
- Under CEQA, requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare an ND, mitigated ND, or EIR for this action, unless the project is exempt from CEQA (Public Resources Code § 21000 et seq.).
FISCAL EFFECT: According to the Senate Appropriations Committee, pursuant to Senate Rule 28.8, negligible state costs.
COMMENTS:
- Bill Summary. This bill restores the requirement that cities and counties approving certain larger development projects identify a water system that would supply water for that project and require the completion of a WSA. Specifically, this bill requires a city or county, within 15 days of an application, instead of upon making a CEQA determination as in current law, to request a public water system to determine whether the projected water demand associated with a project was included in the most recent UWMP. This bill also develops an expedited timeline of 45 days for the completion of WSAs for specified projects, and it allows the city or county to seek a writ of mandamus to compel the public water system to submit the WSA if they fail to do so.
This bill provides that a WSA is an informational document and not a final agency action subject to judicial review except in certain situations. Lastly, this bill specifies that this bill must not be construed to subject a project to discretionary review if the project is required to be permitted ministerially or to subject a project to the requirements of CEQA if the project is otherwise exempt. The East Bay Municipal Utility District is the sponsor of this bill.
- Author’s Statement. According to the Author, “SB 1085 restores an important, long-standing safeguard on water availability for large new developments that was inadvertently circumvented through recent legislation. For more than two decades, state law has required water supply assessments (WSAs) for certain large development projects to strengthen the link between land use planning and water supply planning. These assessments ensure that local governments have a clear, forward-looking understanding of whether sufficient water supplies exist to serve new development alongside existing and planned uses over a 20-year horizon.
“Because WSAs have been a consistent part of California’s planning framework, communities have largely been able to rely on the expectation that growth would be supported by real, available water supplies. That was not always the case. Prior to these requirements, reliance on ‘paper water’ contributed to serious consequences in some regions, particularly in the Central Valley, where communities experienced water shortages so severe that residents had to rely on bottled water for basic needs.
“In recent years, the Legislature has appropriately focused on removing barriers to housing development, including through CEQA streamlining and exemptions. However, because WSAs are currently triggered by CEQA, these changes have had the unintended effect of removing this key planning tool for projects that still meet large development thresholds. Without a WSA, cities and counties may lack critical information about water demand and long-term supply reliability.
“At a time when climate change is increasing pressure on California’s water systems, SB 1085 ensures that this proven planning tool remains in place to support informed decision-making and sustainable growth.”
- Water Supply Assessments. California's efforts to better align development decisions with available water resources stem largely from two statutes enacted 25 years ago: SB 610 (Costa, Chapter 643, Statutes of 2001) and SB 221 (Kuehl, Chapter 642, Statutes of 2001). These measures were adopted in response to concerns that local governments were approving growth and development without adequately considering whether sufficient water supplies existed to support those projects. Collectively known as the "show-me-the-water" laws, the statutes established new requirements intended to integrate water supply considerations into the land use approval process.
These statutes created a framework that requires coordination between local planning agencies and water suppliers. The goal is to ensure that water availability is considered as part of development planning rather than after land use decisions have already been made. SB 221 applies later in the development process and requires confirmation of an adequate water supply before approval of certain residential subdivision maps under the Subdivision Map Act. SB 610, on the other hand, focuses on the earlier environmental review phase of project approval and requires preparation of a WSA for specified residential, commercial, and industrial developments so that water availability is evaluated before key planning decisions are made.
The trigger for a city or county to request a WSA from a water supplier (or do it themselves) is the determination that certain large-scale projects are also subject to CEQA. A WSA requires the identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and a description of the quantities of water received in prior years by the public water system or the city or county through its water rights or other sources. The WSA must be completed within 90 days of the request by the city or county, but the water system may request a 30-day extension. Once completed, the WSA must be incorporated into the analysis of the project under CEQA.
When preparing a WSA, an urban water supplier is able to use the assessment included in an UWMP. UWMPs are required of urban water suppliers who serve more than 3,000 customers and are required to contain an assessment of the reliability of water sources over the next 20 years, a description of demand management measures, a water shortage contingency plan, and a discussion of the use and planned use of recycled water. Although the UWMP may be a valuable analysis for preparing a WSA, not all water suppliers are required to develop a UWMP, and even water suppliers with a UWMP may not have foreseen the scale or demand on their water supply. By examining potential supply constraints early in the approval process, WSAs can help developers, local governments, and water providers address water-related challenges before they become obstacles to project implementation.
- Changes to CEQA. CEQA is the process for ensuring informed decision-making by requiring the evaluation and disclosure of the potential environmental impacts of proposed projects before they are approved. This process provides opportunities for public participation in the review process and requires agencies to consider feasible alternatives and mitigation measures to reduce environmental harm where possible. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be significant environmental effects, the lead agency prepares an ND. If the initial study shows that the project may have significant environmental effects, the lead agency must prepare an EIR. Some projects are eligible for CEQA exemptions. If a project is exempt from CEQA, the lead agency simply identifies which exemption the project is eligible for, and no further environmental review or public engagement is required.
Over the past several years, the Legislature has enacted various CEQA exemptions and ministerial approvals to “speed up” the approval process and reduce litigation risk for various types of development projects that meet specified requirements, including ministerial approvals for housing developments and CEQA exemptions for some housing, commercial, and industrial developments.
Most recently, the Legislature enacted SB 131 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2025) and AB 130 (Committee on Budget, Chapter 22, Statutes of 2025). SB 131, among other things, exempted from CEQA specified agricultural employee housing projects; projects that consist exclusively of a day care center, rural health clinic, nonprofit food bank or food pantry, or facility for advanced manufacturing; and heavy maintenance facilities or other maintenance facilities for electrically powered high-speed rail, as provided. SB 131 also established a process to review housing development projects that meet all but one eligibility criteria for specified CEQA exemptions (often referred to as a “near-miss”), with specified exemptions. AB 130, among other things, exempted from CEQA certain housing development projects that are not more than 20 acres, are consistent with the applicable general plan and zoning ordinance, as well as any applicable local coastal program, as specified, and meet other criteria.
As noted above, a city or county is required to initiate the WSA request once it determines what kind of CEQA documentation is needed for that project. However, with the enactment of SB 131 and AB 130, many projects that were previously subject to CEQA, such as advanced manufacturing facilities, maintenance facilities for electrically powered high-speed rail, or certain larger housing development projects, are now exempt. Although there have been numerous CEQA exemptions before these bills, the exemptions within these bills are broader than other infill exemptions because they apply to larger sites (up to 20 acres) and include fewer conditions to qualify. Because these projects are exempt from the CEQA process, they do not trigger the requirement to identify the water systems that may supply water for the project.
- Previous Legislation. AB 130 (Committee on Budget), Chapter 22, Statutes of 2025, exempted infill housing projects on lots of up to 20 acres in size from CEQA.
SB 131 (Committee on Budget), Chapter 24, Statutes of 2025, made numerous changes to CEQA, including creating CEQA exemptions for advanced manufacturing, stations for high-speed rail, for rezoning of housing elements, and day care facilities, among others.
AB 2011 (Wicks), Chapter 647, Statutes of 2022, required ministerial approval of housing projects on commercial lots if they meet certain affordability, labor, environmental and other conditions.
SB 35 (Wiener), Chapter 366, Statutes of 2017, established a process for streamlined, ministerial review of housing projects on infill sites if they meet specified affordability, labor, environmental, and other conditions.
SB 221 (Kuehl), Chapter 642, Statutes of 2001, prohibited the approval of a tentative map or a development agreement for more than 500 dwelling units unless a city or county provides written verification of sufficient water supply.
SB 610 (Costa), Chapter 643, Statutes of 2001, required a water system to prepare a WSA for certain large-scale developments.
- Arguments in Support. According to the East Bay Municipal Utility District, sponsor of this bill, “EBMUD sponsored SB 901 (Costa, 1995) and SB 610 (Costa, 2001) to link land use planning with water supply planning. Those measures established Water Supply Assessment (WSA) law in the Water Code and have been in place since 2002. A WSA is required for certain types of large residential, commercial, and mixed-use projects to assess the water demand impact of the project. Under current law, a city or county, upon determining that a project is subject to the California Environmental Quality Act (CEQA), shall request a WSA from a water supplier if the development meets the definition of ‘project’ contained in the Water Code. While the Water Code defines which projects need a WSA, the trigger for requiring the WSA was when the city or county determined that the project was subject to CEQA review.
“In recent years, because of the Legislature’s and Governor’s focus on removing impediments to housing, there have been a growing number of bills that streamline development by eliminating CEQA review, as well as legislation that establishes statutory CEQA exemptions for certain types of affordable and infill housing. Those successful legislative efforts meant that a WSA was no longer required for projects that still met the Water Code criteria but were no longer subject to CEQA.
“A WSA presents an opportunity for early coordination between a water supplier, land use entity, and a developer to help ensure a reliable, long-term water supply and the construction of the necessary infrastructure to support new developments. As climate change continues to challenge the reliability of future water supplies, the WSA process allows water suppliers to provide important information to developers regarding reliability during future droughts, necessary infrastructure upgrades and costs, water conservation measures in place, and potential availability of recycled water to serve projects. This early coordination between the water supplier and developer can minimize surprises that could otherwise occur further along in the development process, thus aiding in smoother project implementation.
“SB 1085 (Durazo) would ensure that regardless of whether a project is subject to CEQA review, any large residential, commercial, or mixed-use project that meets the definition of ‘project’ contained in WSA law shall trigger the requirement for a WSA to be completed. We believe that the WSA continues to be an important tool in the water and land use planning and development process and should be restored.”
- Arguments in Opposition. According to Fieldstead and Company on a previous version of this bill, “Under existing law, the WSA requirement is conditioned on a project being subject to CEQA. As a result, projects exempt from CEQA pursuant to AB 130 or SB 131 or projects approved ministerially under SB 35, SB 423, or AB 2011, do not trigger a WSA. SB 1085 would change that by requiring WSAs for all projects subject to Water Code § 10910, regardless of CEQA status. By tying that WSA requirement to the existing CEQA process, the bill effectively brings back CEQA-style legal challenges for projects the Legislature had already exempted. This exposes infill housing to lawsuits it would otherwise avoid. Moreso, even weak cases would cause delays, add costs, and create uncertainty to projects. As a consequence, this will lead to fewer homes and higher rents in California.”
- Double-Referral. This bill is double referred to the Water, Parks, and Wildlife Committee, where it passed on 11-0 vote on June 16, 2026.
REGISTERED SUPPORT / OPPOSITION:
Support
East Bay Municipal Utility District [SPONSOR]
American Planning Association, California Chapter
Association of California Water Agencies
California Coastkeeper Alliance
California Environmental Voters
California Farm Bureau
California Municipal Utilities Association
California Special Districts Association
California State Association of Counties
California Water Association
California-Nevada Section, American Water Works Association
City of Sacramento
Clean Eart 4 Kids
Clean Water Action
Community Alliance with Family Farmers
Community Water Center
Contra Costa Water District
Defenders of Wildlife
Friends of the River
Irvine Ranch Water District
Las Virgenes Municipal Water District
Leadership for Justice and Accountability
Mono Lake Committee
Olivenhain Municipal Water District
Planning and Conservation League
Rancho California Water District
Regional Water Authority
San Francisco Baykeeper
San Joaquin Valley Water Collaborative Action Program
Santa Clara Valley Water District
Sierra Club California
State Building & Construction Trades Council of California
Trout Unlimited
Unite Here International Union, AFL-CIO
Western Municipal Water District
Wholly H2O
Opposition
Fieldstead and Company (previous version)
Analysis Prepared by: Jimmy MacDonald / L. GOV. / (916) 319-3958
Date of Hearing: June 16, 2026
ASSEMBLY COMMITTEE ON WATER, PARKS, AND WILDLIFE
Diane Papan, Chair
SBPCA Bill Id:SB 1085
Author:(Durazo) – As Amended Ver:April 23, 2026
SENATE VOTE: 35-1
SUBJECT: Water supply planning: housing developments
SUMMARY: Restores the requirement that cities and counties approving certain projects identify a water system that would supply water for that project and require the completion of a water supply assessment (WSA). Specifically, this bill:
- Requires a city or county to identify a water system that will serve a project (as defined in Existing Law #3) and requires that water system to prepare a WSA, or if a water system cannot be identified to serve a project, requires the city or county to prepare a WSA once one of the following occurs:
- An applicant submits to the city or county a preliminary application for a housing development project that meets certain conditions, including that the project not be larger than 20 acres; or
- The county or city determines that a development project application is completed and does not meet the conditions of (a).
- Requires the city or county, within 15 days of the application, to request the public water system to determine if the water demand of the project was included in the most recent urban water management plan (UWMP).
- Develops an expedited timeline of 45 days for the completion of WSAs for projects that meet the condition of #1a, above, or other affordable housing projects. Further, allows the city or county to seek a writ of mandamus to compel the public water system to submit the WSA if they fail to do so.
- Determines that the WSA is an informational document and not a final agency action.
- States that this statute shall not be construed to subject a project to either of the following:
- Discretionary review by a city or county if the project is required to be permitted ministerially; or
- The requirements of the California Environmental Quality Act (CEQA) if the project is otherwise exempt.
- States that no reimbursement is required by this bill pursuant to the Constitution.
- Makes other conforming changes.
EXISTING LAW:
- Requires any city or county with a project as defined in #3, that is subject to CEQA to identify any water system whose service area includes, or is adjacent to, the project that may provide water supply for the project at the time the city or county is developing an environmental impact report (EIR), negative declaration (ND), or mitigated ND under CEQA (Water Code § 10910). Further,
- Requires a city or county, when determining whether an EIR, ND, or mitigated ND is needed for a project, to request each public water system to determine whether the projected water demand associated with the proposed project was included as a part of the most recently adopted UWMP.
- Allows, that if the water demand was accounted for in the UWMP, the public water system to incorporate the UWMP into the WSA.
- Requires, that if the water demand was not accounted for in the UWMP or there is no UWMP, the WSA to include a discussion of whether there is sufficient water supply available considering current and projected water demand for the next 20 years.
- Requires, that if a public water system cannot be identified, the city or county shall prepare the WSA.
- Requires a city or county, when determining whether an EIR, ND, or mitigated ND is needed for a project, to request each public water system to determine whether the projected water demand associated with the proposed project was included as a part of the most recently adopted UWMP.
- Requires a WSA to include identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and, if a public water system is preparing the WSA, a description of the quantities of water received in prior years [Water Code § 10910 (d)].
- Defines a “project” to mean any of the following [Water Code § 10912 (a) and (b)]:
- A proposed residential development of more than 500 dwelling units;
- A proposed shopping center or business establishment employing more than 1,000 persons or having more than 500,000 square feet of floor space;
- A proposed commercial office building employing more than 1,000 persons or having more than 250,000 square feet of floor space;
- A proposed hotel or motel, or both, having more than 500 rooms;
- A proposed industrial, manufacturing, or processing plant, or industrial park planned to house more than 1,000 persons, occupying more than 40 acres of land, or having more than 650,000 square feet of floor area;
- A mixed-use project that includes one or more of the projects specified in this subdivision;
- A project that would demand an amount of water equivalent to, or greater than, the amount of water required by a 500-dwelling unit project; or
- A project that would account for an increase of 10% or more of a public waters system connections, if that public waters system has fewer than 5,000 service connections.
- Establishes the Urban Water Management Planning Act that, among other things, requires an urban water supplier to prepare and adopt an urban water management plan, which includes a description of how much water the supplier has on a reliable basis, how much it needs for the foreseeable future, what the agency’s strategy is for meeting its water needs, the challenges facing the agency, and any other information necessary to provide a general understanding of the agency’s plan. Requires a urban water management plan to be updated at least once every five years (Water Code § 10610 et seq.).
- Under CEQA, requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare an ND, mitigated ND, or EIR for this action, unless the project is exempt from CEQA (Public Resources Code § 21000 et seq.)
- Makes certain housing development projects that meet specified requirements a use by right (Government Code § 65913.4 and § 65912.110 et seq.).
FISCAL EFFECT: Unknown. This bill is keyed fiscal.
COMMENTS:
- Purpose of this bill. According to the author, “[This bill] restores an important, long-standing safeguard on water availability for large new developments that was inadvertently circumvented through recent legislation. For more than two decades, state law has required [WSAs] for certain large development projects to strengthen the link between land use planning and water supply planning. These assessments ensure that local governments have a clear, forward-looking understanding of whether sufficient water supplies exist to serve new development alongside existing and planned uses over a 20-year horizon.
Because WSAs have been a consistent part of California’s planning framework, communities have largely been able to rely on the expectation that growth would be supported by real, available water supplies. That was not always the case. Prior to these requirements, reliance on “paper water” contributed to serious consequences in some regions, particularly in the Central Valley, where communities experienced water shortages so severe that residents had to rely on bottled water for basic needs.
In recent years, the Legislature has appropriately focused on removing barriers to housing development, including through CEQA streamlining and exemptions. However, because WSAs are currently triggered by CEQA, these changes have had the unintended effect of removing this key planning tool for projects that still meet large development thresholds. Without a WSA, cities and counties may lack critical information about water demand and long-term supply reliability.
At a time when climate change is increasing pressure on California’s water systems, [this bill] ensures that this proven planning tool remains in place to support informed decision-making and sustainable growth.”
- Background. California's efforts to better align development decisions with available water resources stem largely from two statutes enacted 25 years ago: SB 610 (Costa, Chapter 643, Statutes of 2001) and SB 221 (Kuehl, Chapter 642, Statutes of 2001). These measures were adopted in response to concerns that local governments were approving growth and development without adequately considering whether sufficient water supplies existed to support those projects. Collectively known as the "show-me-the-water" laws, the statutes established new requirements intended to integrate water supply considerations into the land use approval process.
These statutes created a framework that requires coordination between local planning agencies and water suppliers. The goal is to ensure that water availability is considered as part of development planning rather than after land use decisions have already been made. SB 221 applies later in the development process and requires confirmation of an adequate water supply before approval of certain residential subdivision maps under the Subdivision Map Act. SB 610, on the other hand, focuses on the earlier environmental review phase of project approval and requires preparation of a WSA for specified residential, commercial, and industrial developments so that water availability is evaluated before key planning decisions are made.
WSAs: water supplies assured? The trigger for a city or county to request a WSA from a water supplier (or do it themselves) is the determination that certain large-scale projects are also subject to CEQA (note: not all CEQA “projects” are WSA “projects”; see Existing Law #3). A WSA requires the identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and a description of the quantities of water received in prior years by the public water system or the city or county through its water rights or other sources. The WSA must be completed within 90 days of the request by the city or county, but the water system may request a 30-day extension. Once completed, the WSA must be incorporated into the analysis of the project under CEQA.
When preparing a WSA, an urban water supplier is able to use the assessment included in an UWMP. UWMPs are required of urban water suppliers who serve more than 3,000 customers and are required to contain an assessment of the reliability of water sources over the next 20 years, a description of demand management measures, a water shortage contingency plan, and a discussion of the use and planned use of recycled water. Although the UWMP may be valuable analysis for preparing a WSA, not all water suppliers are required to develop a UWMP, and even water suppliers with a UWMP may not have foreseen the scale or demand on their water supply. By examining potential supply constraints early in the approval process, WSAs can help developers, local governments, and water providers address water-related challenges before they become obstacles to project implementation.
The effectiveness of California's water supply adequacy laws was examined through two surveys in the Golden Gate University Law Review article, “Show Me the Water: Urban Water Management Plans and California's Water Supply Adequacy Laws.”[1] The first survey in 2004 revealed that across 59 cities and counties, water supply adequacy reviews had been completed for 95 projects. Nine of those projects were initially found to lack sufficient water supplies. Of those nine cases, developers were able to find additional water supplies or modify their project, but for the other two projects, the option of augmenting supplies was considered infeasible, and the projects were rejected. Five years later, the 2009 survey revealed similar trends. The study included 108 jurisdictions, 96 of which had prepared water supply assessments for a total of 261 projects between 2005 and 2009 with only one of those projects unable to proceed because of water supply concerns. Encouragingly, 30% of the projects adopted special measures to introduce conservation, recycled water, or secured additional water through water transfers.
CEQA later. CEQA is the process for ensuring informed decision-making by requiring the evaluation and disclosure of the potential environmental impacts of proposed projects before they are approved. This process provides opportunities for public participation in the review process and requires agencies to consider feasible alternatives and mitigation measures to reduce environmental harm where possible. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be significant environmental effects, the lead agency prepares an ND. If the initial study shows that the project may have significant environmental effects, the lead agency must prepare an EIR. Some projects may be eligible for CEQA exemptions. If a project is exempt from CEQA, the lead agency simply identifies which exemption the project is eligible for, and no further environmental review or public engagement is required.
Over the past several years, the Legislature has enacted various CEQA exemptions and ministerial approvals to “speed up” the permitting process and reduce litigation risk for various types of development projects that meet specified requirements, including ministerial approvals for housing developments and CEQA exemptions for housing, commercial, and industrial developments.
Most recently, the Legislature enacted SB 131 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2025) and AB 130 (Committee on Budget, Chapter 22, Statutes of 2025). SB 131, among other things, exempted from CEQA agricultural employee housing projects; projects that consist exclusively of a day care center, rural health clinic, nonprofit food bank or food pantry, or facility for advanced manufacturing; and heavy maintenance facilities or other maintenance facility for electrically powered high-speed rail, as provided. SB 131 also established a process to review housing development projects that meet all but one eligibility criteria for specified CEQA exemptions (often referred to as a “near-miss”), with specified exemptions. AB 130, among other things, exempted from CEQA certain housing development projects that are not more than 20 acres, are consistent with the applicable general plan and zoning ordinance, as well as any applicable local coastal program, as specified, and meet other criteria.
As noted above, a city or county is required to initiate the WSA request once it determines what kind of CEQA documentation is needed for that project. However, with the enactment of SB 131 and AB 130, many projects that were previously subject to CEQA, such as advanced manufacturing facilities, maintenance facilities for electrically powered high-speed rail, or certain larger housing development projects, are now exempt. Although there have been numerous CEQA exemptions before these bills, the exemptions within these bills are significantly broader than other infill exemptions because they apply to larger sites (up to 20 acres) and include fewer conditions to qualify. Because a city or county is no longer required to determine the appropriate environmental review document for these projects, it does not activate the requirement to identify the water systems that may supply water for the project. It is likely that the Legislature was unaware of this consequence at the time, considering how valuable the WSA is to local water suppliers.
Water supply and CEQA suits. CEQA is enforced by civil lawsuits that can challenge any project’s environmental review. Some stakeholders argue that requiring a WSA would provide an opportunity for opponents to a development project to delay or stop a project through litigation. There is concern that a project opponent would directly challenge the contents of the WSA itself if the project was CEQA exempt.
It is unclear if, outside of CEQA, such a right of action exists since challenges to the adequacy of a water supply assessment have generally occurred pursuant to CEQA. As noted in the Senate Natural Resources and Water Committee analysis, California Water Impact Network v. Newhall County Water District, 161 Cal.App.1464 (2008) (California Water), the California Court of Appeal found California Water Impact Network (C-WIN) could not directly challenge the adequacy of a WSA because C-WIN failed to demonstrate that the WSA constitutes a final determination, finding, or decision since the EIR for the project had not yet been certified and that C-WIN failed to exhaust its administrative remedies pursuant to CEQA. The court, noting that “until a public agency makes a ‘final’ decision, the matter is not ripe for judicial review,” reasoned that the WSA is “a technical, informational advisory opinion of the water provider. Though the WSA is required by statute to include an assessment of certain statutorily identified water supply issues and is required to be included in the EIR, the WSA’s role in the EIR process is akin to that of other informational opinions provided by other entities concerning potential environmental impacts.” Because it is the lead agency that ultimately decides whether to accept or reject the water supplier’s analysis and whether water supplies are sufficient for the proposed project, the court concluded that the WSA is not final for the purposes of mandamus review until the lead agency makes a final determination on the sufficiency of water supplies, the CEQA review is complete, and the project is approved.
O.W.L. Foundation v. City of Rohnert Park, 168 Cal.App.4th 568 (2008) (O.W.L.), affirmed the position of California Water that “the adequacy of a WSA is not subject to judicial challenge until after a lead agency has certified an EIR and approved a project.” Recently, in City of Vallejo v. City of American Canyon, 117 Cal.App.5th 1112 (2026) (City of Vallejo), the California Court of Appeal held that a neighboring city’s challenge to another city’s WSA, which was incorporated into its certified EIR for an industrial warehouse complex project, was justiciable. The court in City of Vallejo distinguished the case before them from California Water, stating that “unlike the water assessment in California Water, the instant [WSA] was evaluated by the lead agency, incorporated into the EIR, and certified. Consequently, we are not confronted with the same finality and exhaustion concerns as the California Water court.”
It is worth noting that both the California Water and City of Vallejo cases were challenges alleging violations of CEQA law. The court in the O.W.L. case did determine that the WSA could be challenged, but only because the EIR had been certified. The O.W.L. court highlighted that the court’s conclusion was limited to the unique facts of that case. Thus, case law provides little insight into whether reinstating these water supply planning requirements will invite litigation for these projects. Therefore, it is unknown whether a court would find that a WSA prepared outside of the context of CEQA can be challenged separately from a city or county’s final action on a development project. However, to ensure protections from this litigation, following the most recent set of amendments, this bill now includes language inspired by the decision C-WIN case: “A water supply assessment prepared pursuant to this part is an informational document and not a final agency action,” which should provide suitable protection and indicate Legislative intent.
- Proposed committee amendments. Proposed committee amendments make technical corrections to Water Code § 10911, that has legacy errors in the cross-reference citation. These amendments will align this water code section with the WSA statute. Amendments to Water Code § 10914 are to address concerns from organizations with an oppose-unless-amended position about the litigation risk for certain projects. These amendments determine that a WSA for a CEQA-exempt housing development project, as defined, is not subject to judicial review.
Make technical corrections to Water Code § 10911 (a):
(a) If, as a result of its assessment, the public water system concludes that its water supplies are, or will be, insufficient, the public water system shall provide to the city or county its plans for acquiring additional water supplies, setting forth the measures that are being undertaken to acquire and develop those water supplies. If the city or county, if either is required to comply with this part pursuant to subdivision (b), (b) of Section 10910, concludes as a result of its assessment, that water supplies are, or will be, insufficient, the city or county shall include in its water supply assessment its plans for acquiring additional water supplies, setting forth the measures that are being undertaken to acquire and develop those water supplies. Those plans may include, but are not limited to, information concerning all of the following:
(1) The estimated total costs, and the proposed method of financing the costs, associated with acquiring the additional water supplies.
(2) All federal, state, and local permits, approvals, or entitlements that are anticipated to be required in order to acquire and develop the additional water supplies.
(3) Based on the considerations set forth in paragraphs (1) and (2), the estimated timeframes within which the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), (b) of Section 10910, expects to be able to acquire additional water supplies.
Protect CEQA-exempt housing development projects from judicial challenge regarding the WSA in Water Code § 10914 (d):
(d) A water supply assessment prepared pursuant to this part is an informational document and not a final agency action. action subject to judicial review except as part of either of the following:
(1) A challenge to a city or county’s certification of an environmental impact report, or adoption of a negative declaration or mitigated negative declaration, for a housing development project.
(2) A challenge to a city or county’s approval or disapproval of a project, as defined in Section 10912, that is not a housing development project.
- Arguments in support. A coalition of water agencies and water-concerned organizations write that this bill “restores an important safeguard on water availability for new large developments that was inadvertently circumvented through recent legislation.” The supporters share the benefits of linking land use and water supply through the WSA and the value of this early coordination. They note that a WSA is an “important tool for ensuring that new large developments have a long-term water supply, which is critical in light of the impacts that climate change and future droughts could have on areas throughout the state.”
- Oppose unless amended. The California Home Building Alliance (CHBA) writes with an oppose unless amended position on this bill. CHBA writes with concern that this bill “opens an unintended hook for private litigation against precisely the infill housing California is working hardest to build.” They argue that even weak challenges “would cause delays, add costs, and create uncertainty to projects.”
- Double referral. This bill is also referred to the Assembly Local Government Committee.
- Related legislation. AB 130 (Committee on Budget), Chapter 22, Statutes of 2025, exempts infill housing projects on lots of up to 20 acres in size from CEQA.
SB 131 (Committee on Budget), Chapter 24, Statutes of 2025, makes numerous changes to CEQA, including creating CEQA exemptions for advanced manufacturing, stations for high-speed rail, an exemption for rezoning of housing elements, and day care facilities, among others.
AB 2011 (Wicks), Chapter 647, Statutes of 2021, requires ministerial approval of housing projects on commercial lots if they meet certain affordability, labor, environmental and other conditions.
SB 35 (Wiener), Chapter 366, Statutes of 2017, establishes a process for streamlined, ministerial review of housing projects on infill sites if they meet specified affordability, labor, environmental, and other conditions.
SB 221 (Kuehl), Chapter 642, Statutes of 2001, prohibits the approval of a tentative map or a development agreement for more than 500 dwelling units unless a city or county provide written verification of sufficient water supply, under the Subdivision Map Act.
SB 610 (Costa), Chapter 643, Statutes of 2001, requires a water system to prepare a WSA for certain large-scale developments.
REGISTERED SUPPORT / OPPOSITION:
Support
East Bay Municipal Utility District (Sponsor)
American Planning Association California Chapter
American Water Works Association, California-Nevada Section
Association of California Water Agencies
California Coastkeeper Alliance
California Environmental Voters
California Farm Bureau
California Municipal Utilities Association
California Special Districts Association
California State Association of Counties
California Water Association
City of Sacramento
Clean Water Action
Cleanearth4kids.org
Community Alliance With Family Farmers
Community Water Center
Contra Costa Water District
Defenders of Wildlife
Friends of the River
Irvine Ranch Water District
Las Virgenes Municipal Water District
Leadership Counsel for Justice and Accountability
Mono Lake Committee
Olivenhain Municipal Water District
Planning and Conservation League
Regional Water Authority
San Francisco Baykeeper
San Joaquin Valley Water Collaborative Action Program
Sierra Club California
Trout Unlimited
Valley Water
Western Municipal Water District
Wholly H2O
Opposition
Abundant Housing Los Angeles
California Building Industry Association
California Council for Affordable Housing
California YIMBY
Fieldstead and Company, INC.
SPUR
Analysis Prepared by: Stephanie Mitchell / W., P., & W. / (916) 319-2096
Ellen Hanak, Show Me The Water Plan: Urban Water Management Plans and California’s Water Supply Adequacy Laws, 4 Golden Gate University Entl. L.J. (2010). ↑
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 1085 |
THIRD READING
Bill No: SB 1085
Author: Durazo (D), et al.
Amended: 4/23/26
Vote: 21
SENATE NATURAL RES. & WATER COMMITTEE: 6-0, 4/14/26
AYES: Becker, Seyarto, Allen, Cabaldon, Cortese, Stern
NO VOTE RECORDED: Grove
SENATE LOCAL GOVERNMENT COMMITTEE: 7-0, 4/22/26
AYES: Durazo, Choi, Arreguín, Ashby, Cervantes, Laird, Seyarto
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SUBJECT: Water supply planning: housing developments
SOURCE: East Bay Municipal Utility District
DIGEST:
This bill reinstates a requirement that cities and counties approving certain large commercial, industrial, or housing development projects identify any water system whose service area includes the project site and any water system adjacent to the project site that may become a public water system and supply water to the project and revises the timeframe in which a public water system would be required to complete a water supply assessment for certain housing development projects that are subject to a specified California Environmental Quality Act (CEQA) exemption or ministerial by-right approval processes.
ANALYSIS:
Existing law:
- Under water supply planning requirements:
- Requires any city or county that determines a project, as defined below, is subject to CEQA to comply with certain requirements relating to water supply planning. (Water Code (WAT) §§10910 et seq.).
- Defines, for purposes of water supply planning, a “project” large-scale residential, commercial, hotel, industrial, or mixed-use projects proposing 500 or more new water connections or an equivalent size for other uses (WAT §10913).
- Requires the city or county, at the time it determines whether an environmental review document is required, to identify any water system whose service area includes the project site and any water system adjacent to the project that is, or may become as a result of supplying water to the project identified, a public water system, that may supply water for the project. If the city of county is not able to identify a public water system, the city or county is required to prepare a water supply assessment (WSA), as specified (WAT §10910(b)).
- Requires the city or county, at the time it determines whether an environmental review document is required, to request each public water system identified pursuant to c) to determine whether the projected water demand associated with the proposed project was included in the most recent urban water management plan.
- Requires the governing body of each public water system to submit the assessment to the city or county no later than 90 days from the date on which the request was received, with the possibility of a 30 day extension. If the public water systems fails to submit the assessment, the city or county may seek a writ of mandamus to compel the governing body of the public water system to comply with the water supply planning requirements.
- Requires, under CEQA, lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare an environmental review document, unless the project is exempt from CEQA (Public Resources Code (PRC) §§21000 et seq.).
- Exempts from CEQA certain housing development projects that are no more than 20 acres, are consistent with the applicable general plan and zoning ordinance, as well as any applicable local coastal program, as specified, and meet other criteria (AB 130 CEQA Exemption) (PRC §21080.66).
- Makes certain housing development projects that meet specified requirements a use by right (SB 35 and AB 2011) (Government Code (GOV) §65913.4, §§65912.110 et seq.).
This bill:
- Requires a city or county to comply with the above-described water supply planning requirements if either of the following apply:
- An applicant submits to the city or county a preliminary application for a housing development project that is subject to an AB 130 CEQA exemption.
- For a project, as defined for purposes of the water supply planning, when the development application is complete, as specified.
- Requires a city or county to identify the water systems upon receipt of an application that meets the criteria described in 1), above.
- Requires, if the city or county is not able to identify any public water system for the project, that the city or county prepare a WSA.
- Requires the city or county, within 15 days of receipt of an application that meets 1), to request each identified public water system to determine whether the projected water demand associated with the proposed project was included in the most recent urban water management plan.
- For housing development projects that are subject to an AB 130 CEQA exemption and projects that are proposed to be permitted pursuant to SB 35 or AB 2011, requires the public water system to submit the assessment to the city or county no later than 45 days from the date that the request was received.
- Specifies that the governing body of each public water system, or the city or county, if either is required to comply with these water supply planning requirements, is not required to approve the assessment at a public meeting.
- Authorizes the city or county to seek a writ of mandamus to compel the public water system to complete with the water supply planning requirements if the public water system fails to submit the assessment.
- Provides that a water supply assessment is an informational document and not a final agency.
- Provides that nothing under these water supply assessment requirements shall be construed to do either of the following:
- Subject a project to discretionary review by a city or county if the project is required to be permitted ministerially, as specified.
- Subject a project to CEQA if the project is otherwise exempt.
Background
“Show me the water” bills. In response to local land use decisions adversely affecting local water supply agencies, the Legislature enacted SB 610 (Costa, Chapter 643, Statutes of 2001) and SB 221 (Kuehl, Chapter 643, Statutes of 2001). Often referred to as the “show-me-the-water” bills, together these two bills formally linked land use planning with water use planning, and vice versa, by requiring local jurisdictions to coordinate with local water utilities to ascertain whether adequate supplies are available to support a new project. As explained in the Golden Gate University Law Review Journal article Show Me the Water: Urban Water Management Plans and California’s Water Supply Adequacy Laws (Show Me the Water Article), these two bills have distinct requirements. SB 610 requires a “water supply assessment,” or WSA, at the relatively early stage of environmental review and covers residential, commercial, and industrial projects. In contrast, SB 221 requires a final check on water availability for residential projects of a certain size threshold at the later stage of Subdivision Map Act approval. Despite these differences, the intents behind both laws are similar: to forge an often missing link in California’s local planning processes.[1]
Today, under these water supply planning requirements, when a city or county determines that one of these larger developments is subject to CEQA, the city or county is required to identify a water system that could serve the site and any water system adjacent to the project site that is a public water system that could supply water for the development. If the city or county is not able to identify such public water systems, the city or county is required to prepare a WSA. These WSA requirements only apply to certain large-scale developments (see Existing law, above).
Not all “projects” under CEQA are “projects” for purposes of the above-described water supply planning requirements.
For additional background information, see the Senate Natural Resources and Water Committee analysis.
Comments
New pathway to litigate is unclear. Courts have generally found that the WSA is an advisory, informational document, and not a final agency action, and as such, can only be challenged as part of a CEQA decision on a project.[2][3] According to the 2nd District Court of Appeals, “The principal purposes of exhaustion requirements include avoidance of premature interruption of administrative processes; allowing an agency to develop the necessary factual background of the case; letting the agency apply its expertise and exercise its statutory discretion; and administrative efficiency and judicial economy.”[4] Opponents of SB 1085 are concerned that the bill could introduce new means of subjecting projects to lawsuits, which can introduce delays that jeopardize financing or increase costs. Because current law requires the WSA to be incorporated into the CEQA determination for a project, courts have never had to address the question of whether a WSA that was produced for a project exempt from CEQA could be litigated. It is unknown whether a court would find that a WSA prepared outside of the context of CEQA can be challenged separately from a city or county’s final action on a development project. To ensure that WSAs don’t slow down project approval through unnecessary litigation early in the project approval process, the Senate Local Government Committee amended SB 1085 to provide that WSAs are informational documents and not a final agency action.
Missed connections. SB 1085 seeks to close a loophole in state law resulting from recent housing legislation that allows projects that would otherwise qualify to escape the requirement for a WSA. However, the state’s show-me-the-water statutes only apply to developments with 500 or more connections, or projects with equivalent water uses. This threshold means relatively few projects undergo a WSA: since 2018, there have been fewer than two hundred housing projects entitled that contain 500 or more units, out of a total of 157,752 entitled projects (0.1%), according to calculations based on data from annual progress reports provided to the California Department of Housing and Community Development. (Because of their size, these projects account for a larger share of overall units: about 17.6% of units entitled during that time.) As a result, current statute may miss numerous smaller developments that may be nonetheless vulnerable to water supply issues. The 2010 Show Me the Water Article reviewed the efficacy of the show-me-the-water laws and indicate other areas for improvement. That review notes that, “California’s water supply-adequacy laws distinguish themselves from those of other states in the arid southwest, where state engineers directly review water adequacy in a significant number of cases.” SB 1085 does not propose wider changes to the WSA statutes—it simply restores the requirement for projects that are exempt from CEQA. As a result, the bill may not comprehensively address water supply issues for new developments.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
East Bay Municipal Utilities District (source)
American Planning Association, California Chapter
Association of California Water Agencies
California Coastkeeper Alliance
California Environmental Voters
California Farm Bureau
California Municipal Utilities Association
California Special Districts Association
California State Association of Counties
California Water Association
City of Sacramento
City of Sacramento Department of Utilities
Clean Earth 4 Kids
Clean Water Action California
Community Water Center
Community Alliance With Family Farmers
Contra Costa Water District
Defenders of Wildlife
Friends of the River
Irvine Ranch Water District
Las Virgenes Municipal Water District
Leadership Counsel for Justice & Accountability
Mono Lake Committee
Olivenhain Municipal Water District
Planning and Conservation League
Rancho California Water District
Regional Water Authority
San Francisco Baykeeper
San Joaquin Valley Water Collaborative Action Program
Santa Clara Valley Water District
Sierra Club California
State Building & Construction Trades Council of California
Trout Unlimited
Unite Here International Union, Afl-cio
Valley Water
Western Municipal Water District
Wholly H2O
OPPOSITION: (Verified 5/11/26)
Abundant Housing Los Angeles
California Building Industry Association
California Council for Affordable Housing
California YIMBY
SPUR
ARGUMENTS IN SUPPORT: According to the author, “SB 1085 restores an important, long-standing safeguard on water availability for large new developments that was inadvertently circumvented through recent legislation. For more than two decades, state law has required water supply assessments (WSAs) for certain large development projects to strengthen the link between land use planning and water supply planning. These assessments ensure that local governments have a clear, forward-looking understanding of whether sufficient water supplies exist to serve new development alongside existing and planned uses over a 20-year horizon.”
“Because WSAs have been a consistent part of California’s planning framework, communities have largely been able to rely on the expectation that growth would be supported by real, available water supplies. That was not always the case. Prior to these requirements, reliance on “paper water” contributed to serious consequences in some regions, particularly in the Central Valley, where communities experienced water shortages so severe that residents had to rely on bottled water for basic needs.”
“In recent years, the Legislature has appropriately focused on removing barriers to housing development, including through CEQA streamlining and exemptions. However, because WSAs are currently triggered by CEQA, these changes have had the unintended effect of removing this key planning tool for projects that still meet large development thresholds. Without a WSA, cities and counties may lack critical information about water demand and long-term supply reliability.”
“At a time when climate change is increasing pressure on California’s water systems, SB 1085 ensures that this proven planning tool remains in place to support informed decision-making and sustainable growth.”
ARGUMENTS IN OPPOSITION: According to the California Building Industry Association (CBIA), “SB 1085 creates unintended consequences that could slow down the critically needed housing projects the Legislature has worked so hard to streamline.
.
.
.
“We do not believe the Legislature overlooked [WSAs] when enacting AB 130 and SB 131 last year. … . The decision to exempt qualifying housing projects from CEQA necessarily included the WSA requirement, as it has always been embedded in the CEQA process. Advancing SB 1085 would reverse these recent policy choices. … .”
Further, CBIA points out that “the statute requires the WSA to be submitted to the city, but is silent on what the city is required to do with it once received. Because the law does not specify whether the lead agency must make findings or condition the project based on the WSA, courts would be left to decipher legislative intent. Opponents could conceivable use this document to file an ordinary writ against the city (arguing the city ignored the WSA or approved the project arbitrarily), effectively recreating the exact type of litigation risk the CEQA exemption was designed to eliminate.” CBIA also argues that recent amendments do not “[prevent] an opponent from filing an ordinary writ of mandamus claiming the lead agency filed its ministerial duty to secure and rely upon a legally adequate WSA before issuing the approval.
.
.
.
“If WSA remains a mandatory statutory step in the city’s approval timeline, CBIA would view that as an erosion of the recent permitting reform, as it would create a new legal vulnerability for housing developers.”
Prepared by: Genevieve Wong / N.R. & W. / (916) 651-4116
5/13/26 16:27:59
**** END ****
SENATE COMMITTEE ON LOCAL GOVERNMENT
Senator María Elena Durazo, Chair
2025 - 2026 Regular
Bill No: | SB 1085 | Hearing Date: | 4/22/26 |
Author: | Durazo | Fiscal: | Yes |
Version: | 4/7/26 | Consultant: | Favorini-Csorba |
Water supply planning: housing developments
Requires a project that meets the qualifications under existing law to undergo a water supply assessment, regardless of whether the California Environmental Quality Act applies.
Background
Water supply planning for new development. An urban water supplier with more than 3,000 customers must adopt an urban water management plan (UWMP). An important component of a UWMP is an assessment of water service reliability during normal, dry, and multiple-dry years. Part of that analysis requires information about the availability of groundwater supplies.
Cities and counties must consider information provided by water suppliers when they act on proposals for large-scale residential, commercial, hotel, industrial, or mixed-use projects (SB 901, Costa, 1995). Every large-scale development project—proposing 500 or more new connections or an equivalent size for other uses—must have a water supply assessment (WSA) (SB 610, Costa, 2001), prepared according to the following process:
- First, a city or county, at the time that it determines that a development is subject to the California Environmental Quality Act (CEQA), must identify any water system that may supply water for the project;
- If the proposed project was included in the UWMP of one of the identified systems, the water system prepares the WSA for the project; and
- If the projected demand was not accounted for, or the city or county was not able to identify a water system to serve the project, the city or county prepares the assessment, in consultation with the local agency formation commission and other relevant water systems.
A WSA must identify any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and describe the quantities of water received in prior years by the public water system or the city or county through its water rights or other sources.
If a water supply for a proposed project includes groundwater, the WSA must include additional information, including a description of any groundwater basins that will supply the project, the court or SWRCB order if the basin is adjudicated, and an analysis of the sufficiency of the groundwater from the basin or basins. Following the enactment of the Sustainable Groundwater Management Act (SGMA) in 2014, which comprehensively reformed California’s groundwater laws, the Legislature updated the requirements for projects that rely on groundwater to integrate SGMA and the WSA statutes.
If, as a result of its WSA, the water system, or city or county if it is preparing the WSA, concludes that its water supplies are, or will be, insufficient, it must provide plans for acquiring additional water supplies, and set forth the measures that are being undertaken to acquire and develop those water supplies.
The WSA must be completed within 90 days of the request by the city or county, but the water system may request a 30 day extension. Once completed, the WSA must be incorporated into the analysis of the project under the California Environmental Quality Act (CEQA).
Greater certainty about water supplies for a proposed development is required later in the process of approving a development. Specifically, the Subdivision Map Act requires cities and counties to demonstrate that a sufficient water supply is available as a condition in their approval of a tentative map for a subdivision with more than 500 dwelling units (SB 221, Kuehl, 2001). Proof of sufficient water must be based on a written verification from the applicable public water system. In order to be sufficient, the water supply must be able to meet the demands of existing and future planned uses in addition to the subdivision’s demand over the next 20 years.
Collectively referred to as the “show-me-the-water” laws, SB 221 and SB 610 sought to link land use planning and water supply considerations by encouraging communication between cities and counties that approve development projects and water agencies that must serve those projects.
Recent legislation on CEQA. Responding to California’s housing affordability crisis, in recent years the Legislature has enacted scores of measures to boost housing development in the state, including measures to reduce barriers to approving new housing. Several of these laws allow large projects to be built without undergoing CEQA review, including:
- SB 35 (Wiener, 2017), which established a process for streamlined, ministerial review of housing projects on infill sites if they meet specified affordability, labor, environmental, and other conditions;
- AB 2011 (Wicks, 2021), which requires ministerial approval of housing projects on commercial lots if they meet certain affordability, labor, environmental and other conditions; and
- AB 130 (Committee on Budget, 2025), which exempts infill housing projects on lots of up to 20 acres in size from CEQA. This exemption is significantly broader than other infill exemptions because it applies to larger sites (up to twenty acres) and includes fewer conditions in order to qualify.
Additionally, SB 131 (Committee on Budget and Fiscal Review, 2025) enacted numerous CEQA exemptions, including an exemption for advanced manufacturing projects that meet specified conditions.
Because current law only requires a WSA when a project is subject to CEQA, these projects can be permitted without analysis of the sufficiency of their water supply. The East Bay Municipal Utility District (EBMUD) wants the Legislature to require WSAs for projects that meet the size requirements in existing law, regardless of whether they are subject to CEQA.
Proposed Law
Senate Bill 1085 requires a project that meets the qualifications under existing law to undergo a WSA, regardless of whether CEQA applies. Specifically, SB 1085 requires a city or county to comply with the requirements of the WSA law upon receiving either of the following:
- A preliminary application for a project, as defined in existing WSA law, that meets the conditions for a CEQA exemption under AB 130; or
- A completed development application if not an AB 130 project.
The city or county has 15 days from receipt, instead of upon making a CEQA determination as in current law, to request a water system to determine whether the water system’s UWMP accounted for the projected demand. For an SB 35, AB 2011, or AB 130 project, the bill also:
- Shortens the timeframe, to 45 days, for the water system to complete the WSA and submit to a city or county; and
- Provides that the governing body of the agency preparing the WSA is not required to approve it at a public meeting.
SB 1085 makes other technical and conforming changes.
Comments
1. Purpose of the bill. According to the author, “SB 1085 restores an important, long-standing safeguard on water availability for large new developments that was inadvertently circumvented through recent legislation. For more than two decades, state law has required water supply assessments (WSAs) for certain large development projects to strengthen the link between land use planning and water supply planning. These assessments ensure that local governments have a clear, forward-looking understanding of whether sufficient water supplies exist to serve new development alongside existing and planned uses over a 20-year horizon.”
“Because WSAs have been a consistent part of California’s planning framework, communities have largely been able to rely on the expectation that growth would be supported by real, available water supplies. That was not always the case. Prior to these requirements, reliance on “paper water” contributed to serious consequences in some regions, particularly in the Central Valley, where communities experienced water shortages so severe that residents had to rely on bottled water for basic needs.”
“In recent years, the Legislature has appropriately focused on removing barriers to housing development, including through CEQA streamlining and exemptions. However, because WSAs are currently triggered by CEQA, these changes have had the unintended effect of removing this key planning tool for projects that still meet large development thresholds. Without a WSA, cities and counties may lack critical information about water demand and long-term supply reliability.”
“At a time when climate change is increasing pressure on California’s water systems, SB 1085 ensures that this proven planning tool remains in place to support informed decision-making and sustainable growth.”
2. Throwback or rolling back? The Legislature has taken consequential action to streamline housing projects with the passage of SB 35, AB 2011, and AB 130. Because projects benefitting from these laws are exempt from CEQA, they don’t undergo a WSA. SB 1085 reimposes the WSA requirement on these projects and others that are exempt from CEQA. Opponents of the measure are concerned that this bill could roll back some of the gains in housing legislation by reimposing steps on housing projects that recent legislative efforts removed. They are concerned that SB 1085 may grant jurisdictions or residents that don’t like a project that the Legislature recently streamlined an opportunity to stall the project.
On the other hand, it is unclear whether WSAs have been an obstacle to housing development for several reasons. First, few, if any, reports of projects being stalled due to WSA compliance have emerged in the quarter-century since the show-me-the-water laws were signed. Second, supporters note that WSAs enable early consultation on water supplies, which benefits developers as well as the public by ensuring that projects have robust supplies, allowing water agencies to begin design for infrastructure earlier, and ensuring that existing uses won’t be affected by new development. Moreover, although a WSA is an additional step, a city or county can still approve a project even if the WSA doesn’t find that there is sufficient water—it must simply include that determination in its findings for the project. Finally, SB 1085 also aligns the timeline for completion of a WSA for an SB 35, AB 130, or AB 2011 project with the timeline for the city or county to approve it, and, consistent with the ministerial approval requirements of SB 35 and AB 2011, removes governing body approval of the WSA for those projects.
Nonetheless, additional steps could be taken to further address uncertainty regarding the effects of SB 1085 on housing approvals. The Committee may wish to consider amending SB 1085 to specify that nothing in the bill’s provisions:
- Subjects a project required to be permitted ministerially by state law, including, but not limited to, SB 35 and AB 2011, to discretionary review by a city or county; or
- Subjects a project that is exempt from CEQA pursuant to a statutory or categorical exemption to review under CEQA.
3. Call my lawyer. Courts have generally found that the WSA is an advisory, informational document, and not a final agency action, and as such, can only be challenged as part of a CEQA decision on a project.[1][2] According to the 2nd District Court of Appeals, “The principal purposes of exhaustion requirements include avoidance of premature interruption of administrative processes; allowing an agency to develop the necessary factual background of the case; letting the agency apply its expertise and exercise its statutory discretion; and administrative efficiency and judicial economy.”[3] Opponents of SB 1085 are concerned that the bill could introduce new means of subjecting projects to lawsuits, which can introduce delays that jeopardize financing or increase costs. Because current law requires the WSA to be incorporated into the CEQA determination for a project, courts have never had to address the question of whether a WSA that was produced for a project exempt from CEQA could be litigated. It is unknown whether a court would find that a WSA prepared outside of the context of CEQA can be challenged separately from a city or county’s final action on a development project. To ensure that WSAs don’t slow down project approval through unnecessary litigation early in the project approval process, the Committee may wish to consider amending SB 1085 to provide that WSAs are informational documents and not a final agency action.
4. Missed connections. SB 1085 seeks to close a loophole in state law resulting from recent housing legislation that allows projects that would otherwise qualify to escape the requirement for a WSA. However, the state’s show-me-the-water statutes only apply to developments with 500 or more connections, or projects with equivalent water uses. This threshold means relatively few projects undergo a WSA: since 2018, there have been fewer than two hundred housing projects entitled that contain 500 or more units, out of a total of 157,752 entitled projects (0.1%), according to calculations based on data from annual progress reports provided to HCD. (Because of their size, these projects account for a larger share of overall units: about 17.6% of units entitled during that time.) As a result, current statute may miss numerous smaller developments that may be nonetheless vulnerable to water supply issues. A 2010 review of the efficacy of the show-me-the-water laws indicate other areas for improvement. That review notes that, “California’s water supply-adequacy laws distinguish themselves from those of other states in the arid southwest, where state engineers directly review water adequacy in a significant number of cases.”[4] SB 1085 does not propose wider changes to the WSA statutes—it simply restores the requirement for projects that are exempt from CEQA. As a result, the bill may not comprehensively address water supply issues for new developments.
5. Technical. SB 1085 requires a city or county to begin the WSA process upon an application being deemed complete, but under the PSA, they determine completeness or the application is deemed complete. Committee staff recommends a technical amendment to correct this mismatch.
6. Mandate. The California Constitution requires the state to reimburse local governments for the costs of new or expanded state mandated local programs. Because SB 1085 adds to the duties of local officials, Legislative Counsel says the bill imposes a new state mandate. SB 1085 disclaims the state’s responsibility for providing reimbursement by citing local governments’ authority to charge for the costs of implementing the bill’s provisions.
7. Incoming! The Senate Rules Committee has ordered a double referral of SB 1085: first to the Committee on Natural Resources and Water, which approved the bill at its April 14th hearing on a vote of 6-0, and second to the Committee on Local Government.
Support and Opposition
(4/17/2026)
Support: Association of California Water Agencies (ACWA)
California Coastkeeper Alliance
California Environmental Voters
California Farm Bureau
California Municipal Utilities Association (CMUA)
California Special Districts Association
California State Association of Counties (CSAC)
California Water Association
City of Sacramento
City of Sacramento Department of Utilities
Clean Earth 4 Kids
Clean Water Action
Clean Water Action California
Cleanearth4kids.org
Communitiy Water Center
Community Alliance With Family Farmers
Community Water Center
Contra Costa Water District
Defenders of Wildlife
East Bay Municipal Utility District
Friends of the River
Irvine Ranch Water District
Las Virgenes Municipal Water District
Leadership Counsel for Justice & Accountability
Leadership Counsel for Justice and Accountability
Mono Lake Committee
Olivenhain Municipal Water District
Planning and Conservation League
Rancho California Water District
Regional Water Authority
San Francisco Baykeeper
San Joaquin Valley Water Collaborative Action Program
Sierra Club California
State Building & Construction Trades Council of California
Trout Unlimited
Unite Here International Union, Afl-cio
Valley Water
Western Municipal Water District
Wholly H2o
Opposition: California Building Industry Association
-- END --
SENATE COMMITTEE ON LOCAL GOVERNMENT
Senator María Elena Durazo, Chair
2025 - 2026 Regular
Bill No: | SB 1085 | Hearing Date: | 4/22/26 |
Author: | Durazo | Fiscal: | Yes |
Version: | 4/7/26 | Consultant: | Favorini-Csorba |
Water supply planning: housing developments
Requires a project that meets the qualifications under existing law to undergo a water supply assessment, regardless of whether the California Environmental Quality Act applies.
Background
Water supply planning for new development. An urban water supplier with more than 3,000 customers must adopt an urban water management plan (UWMP). An important component of a UWMP is an assessment of water service reliability during normal, dry, and multiple-dry years. Part of that analysis requires information about the availability of groundwater supplies.
Cities and counties must consider information provided by water suppliers when they act on proposals for large-scale residential, commercial, hotel, industrial, or mixed-use projects (SB 901, Costa, 1995). Every large-scale development project—proposing 500 or more new connections or an equivalent size for other uses—must have a water supply assessment (WSA) (SB 610, Costa, 2001), prepared according to the following process:
- First, a city or county, at the time that it determines that a development is subject to the California Environmental Quality Act (CEQA), must identify any water system that may supply water for the project;
- If the proposed project was included in the UWMP of one of the identified systems, the water system prepares the WSA for the project; and
- If the projected demand was not accounted for, or the city or county was not able to identify a water system to serve the project, the city or county prepares the assessment, in consultation with the local agency formation commission and other relevant water systems.
A WSA must identify any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and describe the quantities of water received in prior years by the public water system or the city or county through its water rights or other sources.
If a water supply for a proposed project includes groundwater, the WSA must include additional information, including a description of any groundwater basins that will supply the project, the court or SWRCB order if the basin is adjudicated, and an analysis of the sufficiency of the groundwater from the basin or basins. Following the enactment of the Sustainable Groundwater Management Act (SGMA) in 2014, which comprehensively reformed California’s groundwater laws, the Legislature updated the requirements for projects that rely on groundwater to integrate SGMA and the WSA statutes.
If, as a result of its WSA, the water system, or city or county if it is preparing the WSA, concludes that its water supplies are, or will be, insufficient, it must provide plans for acquiring additional water supplies, and set forth the measures that are being undertaken to acquire and develop those water supplies.
The WSA must be completed within 90 days of the request by the city or county, but the water system may request a 30 day extension. Once completed, the WSA must be incorporated into the analysis of the project under the California Environmental Quality Act (CEQA).
Greater certainty about water supplies for a proposed development is required later in the process of approving a development. Specifically, the Subdivision Map Act requires cities and counties to demonstrate that a sufficient water supply is available as a condition in their approval of a tentative map for a subdivision with more than 500 dwelling units (SB 221, Kuehl, 2001). Proof of sufficient water must be based on a written verification from the applicable public water system. In order to be sufficient, the water supply must be able to meet the demands of existing and future planned uses in addition to the subdivision’s demand over the next 20 years.
Collectively referred to as the “show-me-the-water” laws, SB 221 and SB 610 sought to link land use planning and water supply considerations by encouraging communication between cities and counties that approve development projects and water agencies that must serve those projects.
Recent legislation on CEQA. Responding to California’s housing affordability crisis, in recent years the Legislature has enacted scores of measures to boost housing development in the state, including measures to reduce barriers to approving new housing. Several of these laws allow large projects to be built without undergoing CEQA review, including:
- SB 35 (Wiener, 2017), which established a process for streamlined, ministerial review of housing projects on infill sites if they meet specified affordability, labor, environmental, and other conditions;
- AB 2011 (Wicks, 2021), which requires ministerial approval of housing projects on commercial lots if they meet certain affordability, labor, environmental and other conditions; and
- AB 130 (Committee on Budget, 2025), which exempts infill housing projects on lots of up to 20 acres in size from CEQA. This exemption is significantly broader than other infill exemptions because it applies to larger sites (up to twenty acres) and includes fewer conditions in order to qualify.
Additionally, SB 131 (Committee on Budget and Fiscal Review, 2025) enacted numerous CEQA exemptions, including an exemption for advanced manufacturing projects that meet specified conditions.
Because current law only requires a WSA when a project is subject to CEQA, these projects can be permitted without analysis of the sufficiency of their water supply. The East Bay Municipal Utility District (EBMUD) wants the Legislature to require WSAs for projects that meet the size requirements in existing law, regardless of whether they are subject to CEQA.
Proposed Law
Senate Bill 1085 requires a project that meets the qualifications under existing law to undergo a WSA, regardless of whether CEQA applies. Specifically, SB 1085 requires a city or county to comply with the requirements of the WSA law upon receiving either of the following:
- A preliminary application for a project, as defined in existing WSA law, that meets the conditions for a CEQA exemption under AB 130; or
- A completed development application if not an AB 130 project.
The city or county has 15 days from receipt, instead of upon making a CEQA determination as in current law, to request a water system to determine whether the water system’s UWMP accounted for the projected demand. For an SB 35, AB 2011, or AB 130 project, the bill also:
- Shortens the timeframe, to 45 days, for the water system to complete the WSA and submit to a city or county; and
- Provides that the governing body of the agency preparing the WSA is not required to approve it at a public meeting.
SB 1085 makes other technical and conforming changes.
Comments
1. Purpose of the bill. According to the author, “SB 1085 restores an important, long-standing safeguard on water availability for large new developments that was inadvertently circumvented through recent legislation. For more than two decades, state law has required water supply assessments (WSAs) for certain large development projects to strengthen the link between land use planning and water supply planning. These assessments ensure that local governments have a clear, forward-looking understanding of whether sufficient water supplies exist to serve new development alongside existing and planned uses over a 20-year horizon.”
“Because WSAs have been a consistent part of California’s planning framework, communities have largely been able to rely on the expectation that growth would be supported by real, available water supplies. That was not always the case. Prior to these requirements, reliance on “paper water” contributed to serious consequences in some regions, particularly in the Central Valley, where communities experienced water shortages so severe that residents had to rely on bottled water for basic needs.”
“In recent years, the Legislature has appropriately focused on removing barriers to housing development, including through CEQA streamlining and exemptions. However, because WSAs are currently triggered by CEQA, these changes have had the unintended effect of removing this key planning tool for projects that still meet large development thresholds. Without a WSA, cities and counties may lack critical information about water demand and long-term supply reliability.”
“At a time when climate change is increasing pressure on California’s water systems, SB 1085 ensures that this proven planning tool remains in place to support informed decision-making and sustainable growth.”
2. Throwback or rolling back? The Legislature has taken consequential action to streamline housing projects with the passage of SB 35, AB 2011, and AB 130. Because projects benefitting from these laws are exempt from CEQA, they don’t undergo a WSA. SB 1085 reimposes the WSA requirement on these projects and others that are exempt from CEQA. Opponents of the measure are concerned that this bill could roll back some of the gains in housing legislation by reimposing steps on housing projects that recent legislative efforts removed. They are concerned that SB 1085 may grant jurisdictions or residents that don’t like a project that the Legislature recently streamlined an opportunity to stall the project.
On the other hand, it is unclear whether WSAs have been an obstacle to housing development for several reasons. First, few, if any, reports of projects being stalled due to WSA compliance have emerged in the quarter-century since the show-me-the-water laws were signed. Second, supporters note that WSAs enable early consultation on water supplies, which benefits developers as well as the public by ensuring that projects have robust supplies, allowing water agencies to begin design for infrastructure earlier, and ensuring that existing uses won’t be affected by new development. Moreover, although a WSA is an additional step, a city or county can still approve a project even if the WSA doesn’t find that there is sufficient water—it must simply include that determination in its findings for the project. Finally, SB 1085 also aligns the timeline for completion of a WSA for an SB 35, AB 130, or AB 2011 project with the timeline for the city or county to approve it, and, consistent with the ministerial approval requirements of SB 35 and AB 2011, removes governing body approval of the WSA for those projects.
Nonetheless, additional steps could be taken to further address uncertainty regarding the effects of SB 1085 on housing approvals. The Committee may wish to consider amending SB 1085 to specify that nothing in the bill’s provisions:
- Subjects a project required to be permitted ministerially by state law, including, but not limited to, SB 35 and AB 2011, to discretionary review by a city or county; or
- Subjects a project that is exempt from CEQA pursuant to a statutory or categorical exemption to review under CEQA.
3. Call my lawyer. Courts have generally found that the WSA is an advisory, informational document, and not a final agency action, and as such, can only be challenged as part of a CEQA decision on a project.[1][2] According to the 2nd District Court of Appeals, “The principal purposes of exhaustion requirements include avoidance of premature interruption of administrative processes; allowing an agency to develop the necessary factual background of the case; letting the agency apply its expertise and exercise its statutory discretion; and administrative efficiency and judicial economy.”[3] Opponents of SB 1085 are concerned that the bill could introduce new means of subjecting projects to lawsuits, which can introduce delays that jeopardize financing or increase costs. Because current law requires the WSA to be incorporated into the CEQA determination for a project, courts have never had to address the question of whether a WSA that was produced for a project exempt from CEQA could be litigated. It is unknown whether a court would find that a WSA prepared outside of the context of CEQA can be challenged separately from a city or county’s final action on a development project. To ensure that WSAs don’t slow down project approval through unnecessary litigation early in the project approval process, the Committee may wish to consider amending SB 1085 to provide that WSAs are informational documents and not a final agency action.
4. Missed connections. SB 1085 seeks to close a loophole in state law resulting from recent housing legislation that allows projects that would otherwise qualify to escape the requirement for a WSA. However, the state’s show-me-the-water statutes only apply to developments with 500 or more connections, or projects with equivalent water uses. This threshold means relatively few projects undergo a WSA: since 2018, there have been fewer than two hundred housing projects entitled that contain 500 or more units, out of a total of 157,752 entitled projects (0.1%), according to calculations based on data from annual progress reports provided to HCD. (Because of their size, these projects account for a larger share of overall units: about 17.6% of units entitled during that time.) As a result, current statute may miss numerous smaller developments that may be nonetheless vulnerable to water supply issues. A 2010 review of the efficacy of the show-me-the-water laws indicate other areas for improvement. That review notes that, “California’s water supply-adequacy laws distinguish themselves from those of other states in the arid southwest, where state engineers directly review water adequacy in a significant number of cases.”[4] SB 1085 does not propose wider changes to the WSA statutes—it simply restores the requirement for projects that are exempt from CEQA. As a result, the bill may not comprehensively address water supply issues for new developments.
5. Technical. SB 1085 requires a city or county to begin the WSA process upon an application being deemed complete, but under the PSA, they determine completeness or the application is deemed complete. Committee staff recommends a technical amendment to correct this mismatch.
6. Mandate. The California Constitution requires the state to reimburse local governments for the costs of new or expanded state mandated local programs. Because SB 1085 adds to the duties of local officials, Legislative Counsel says the bill imposes a new state mandate. SB 1085 disclaims the state’s responsibility for providing reimbursement by citing local governments’ authority to charge for the costs of implementing the bill’s provisions.
7. Incoming! The Senate Rules Committee has ordered a double referral of SB 1085: first to the Committee on Natural Resources and Water, which approved the bill at its April 14th hearing on a vote of 6-0, and second to the Committee on Local Government.
Support and Opposition
(4/17/2026)
Support: Association of California Water Agencies (ACWA)
California Coastkeeper Alliance
California Environmental Voters
California Farm Bureau
California Municipal Utilities Association (CMUA)
California Special Districts Association
California State Association of Counties (CSAC)
California Water Association
City of Sacramento
City of Sacramento Department of Utilities
Clean Earth 4 Kids
Clean Water Action
Clean Water Action California
Cleanearth4kids.org
Communitiy Water Center
Community Alliance With Family Farmers
Community Water Center
Contra Costa Water District
Defenders of Wildlife
East Bay Municipal Utility District
Friends of the River
Irvine Ranch Water District
Las Virgenes Municipal Water District
Leadership Counsel for Justice & Accountability
Leadership Counsel for Justice and Accountability
Mono Lake Committee
Olivenhain Municipal Water District
Planning and Conservation League
Rancho California Water District
Regional Water Authority
San Francisco Baykeeper
San Joaquin Valley Water Collaborative Action Program
Sierra Club California
State Building & Construction Trades Council of California
Trout Unlimited
Unite Here International Union, Afl-cio
Valley Water
Western Municipal Water District
Wholly H2o
Opposition: California Building Industry Association
-- END --
SENATE COMMITTEE ON NATURAL RESOURCES AND WATER
Senator Josh Becker, Chair
2025 - 2026 Regular
Bill No: SB Hearing Date: April 14, 2026
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
Subject: Water supply planning: housing developments
SUMMARY
This bill would reinstate a requirement that cities and counties approving certain large commercial, industrial, or housing development projects identify any water system whose service area includes the project site and any water system adjacent to the project site that may become a public water system and supply water to the project and would revise the timeframe in which a public water system would be required to complete a water supply assessment for certain housing development projects that are subject to a specified CEQA exemption or ministerial by-right approval processes.
BACKGROUND AND EXISTING LAW
“Show me the water” bills.
In response to local land use decisions adversely affecting local water supply agencies, the Legislature enacted SB 610 (Costa, Chapter 643, Statutes of 2001) and SB 221 (Kuehl, Chapter 643, Statutes of 2001). Often referred to as the “show-me-the-water” bills, together these two bills formally linked land use planning with water use planning, and vice versa, by requiring local jurisdictions to coordinate with local water utilities to ascertain whether adequate supplies are available to support a new project. As explained in the Golden Gate University Law Review Journal article Show Me the Water: Urban Water Management Plans and California’s Water Supply Adequacy Laws (Show Me the Water Article), these two bills have distinct requirements. SB 610 requires a “water supply assessment,” or WSA, at the relatively early stage of environmental review and covers residential, commercial, and industrial projects. In contrast, SB 221 requires a final check on water availability for residential projects of a certain size threshold at the later stage of Subdivision Map Act approval. Despite these differences, the intents behind both laws are similar: to forge an often missing link in California’s local planning processes.[1]
The water supply planning requirements of SB 610 only apply to the following large-scale developments:
- A residential development of 500 or more units, or a project that would demand an equivalent amount of water as a 500-unit residential development. This also includes a hotel or motel with more than 500 rooms.
- A shopping center or business establishment that employs more than 1,000 people or has more than 500,000 square feet of floor space.
- A commercial office building that employs more than 1,000 people or has more than 250,000 square feet of floor space.
- An industrial, manufacturing, or processing plant, or industrial park planned to house more than 1,000 persons, occupying more than 40 acres of land, or having more than 650,000 square feet of floor area.
- A mixed-use project that includes any of the above-described projects.
- A proposed development that would account for an increase of 10 percent or more of the number of public water system’s existing service connections if the public water system that would serve the project has fewer than 5,000 service connections.
Today, under these water supply planning requirements, when a city or county determines that one of these larger developments is subject to the California Environmental Quality Act (CEQA), and would require either an environmental impact report (EIR), negative declaration (ND), or mitigated ND, the city or county is required to identify a water system that could serve the site and any water system adjacent to the project site that is a public water system that could supply water for the development. If the city or county is not able to identify such public water systems, the city or county is required to prepare a WSA.
CEQA.
CEQA provides a process for evaluating the environmental effects of a project and includes statutory exemptions, as well as categorical exemptions, in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be significant environmental effects, the lead agency prepares an ND. If the initial study shows that the project may have significant environmental effects, the lead agency must prepare an EIR.
Not all “projects” under CEQA are “projects” for purposes of the above-described water supply planning requirements.
Legislative efforts to streamline permitting of development.
Over the past several years, the Legislature has enacted various CEQA exemptions and ministerial approvals to “speed up” the permitting process of various types of development projects that meet specified requirements, including ministerial approvals for housing developments and CEQA exemptions for housing, commercial, and industrial developments.
Most recently, the Legislature enacted SB 131 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2025) and AB 130 (Committee on Budget, Chapter 22, Statutes of 2025). SB 131, a Public Resources Budget Trailer Bill for the 2025-26 budget, among other things, exempted from CEQA agricultural employee housing projects; projects that consist exclusively of a day care center, rural health clinic, nonprofit food bank or food pantry, or facility for advanced manufacturing; and heavy maintenance facilities or other maintenance facility for electrically powered high-speed rail, as provided. SB 131 also established a process to review housing development projects that meet all but one eligibility criteria for specified CEQA exemptions (often referred to as a “near-miss”), with specified exemptions. AB 130, a Housing Budget Trailer Bill for the 2025-26 budget, among other things, exempted from CEQA certain housing development projects that are not more than 20 acres, are consistent with the applicable general plan and zoning ordinance, as well as any applicable local coastal program, as specified, and meet other criteria (AB 130 CEQA exemption).
Additionally, the Legislature has passed SB 35 (Wiener, Chapter 366, Statutes of 2017) which creates a streamlined, ministerial approval process for multifamily housing developments and AB 2011 (Wicks, Chapter 647, Statutes of 2022) which made certain housing developments meeting certain objective standards a use by right and subject to one of two streamlined, ministerial review processes.
Existing law:
- Under water supply planning requirements:
- Requires any city or county that determines a project, as defined below, is subject to CEQA to comply with certain requirements relating to water supply planning. (Water Code (WAT) §§10910 et. seq).
- Defines, for purposes of water supply planning, a “project” as any of the following:
- A proposed residential development of more than 500 dwelling units.
- A proposed shopping center or business establishment employing more than 1,000 persons or having more than 500,000 square feet of floor space.
- A proposed commercial office building employing more than 1,000 persons or having more than 250,000 square feet of floor space.
- A proposed hotel or motel, or both, having more than 500 rooms.
- A proposed industrial, manufacturing, or processing plant, or industrial park planned to house more than 1,000 persons, occupying more than 40 acres of land, or having more than 650,000 square feet of floor area.
- A mixed-use project that includes one or more of the above-described projects.
- A project that would demand an amount of water equivalent to, or greater than, the amount of water required by a 500 dwelling unit project.
- If a public water system has fewer than 5,000 service connections, a proposed residential, business, commercial, hotel or motel, or industrial development that would increase the number of the public water system’s existing service connections by 10 percent or more, or a mixed-use project that would demand any amount of water equivalent to, or greater than, the amount of water required by residential development that would represent an increase of 10 percent or more in the public water system’s existing service connections (WAT §10913).
- A proposed residential development of more than 500 dwelling units.
- Requires the city or county, at the time it determines whether an EIR, ND, or mitigated ND is required, to identify any water system whose service area includes the project site and any water system adjacent to the project that is, or may become as a result of supplying water to the project identified, a public water system, that may supply water for the project. If the city of county is not able to identify a public water system, the city or county is required to prepare a WSA, as specified (WAT §10910(b)).
- Requires the city or county, at the time it determines whether an EIR, ND, or mitigated ND is required, to request each public water system identified pursuant to c) to determine whether the projected water demand associated with the proposed project was included in the most recent urban water management plan.
- Requires the governing body of each public water system to submit the assessment to the city or county no later than 90 days from the date on which the request was received, with the possibility of a 30 day extension. If the public water systems fails to submit the assessment, the city or county may seek a writ of mandamus to compel the governing body of the public water system to comply with the water supply planning requirements.
- Requires any city or county that determines a project, as defined below, is subject to CEQA to comply with certain requirements relating to water supply planning. (Water Code (WAT) §§10910 et. seq).
- Under CEQA, requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare an ND, mitigated ND, or EIR for this action, unless the project is exempt from CEQA (Public Resources Code (PRC) §§21000 et seq.)
- Makes certain housing development projects that meet specified requirements a use by right (Government Code (GOV) §65913.4, §§65912.110 et seq.).
PROPOSED LAW
This bill would:
- Require a city or county to comply with the above-described water supply planning requirements if either of the following apply:
- An applicant submits to the city or county a preliminary application for a housing development project that is subject to an AB 130 CEQA exemption.
- For a project, as defined for purposes of the water supply planning, when the city or county deems a development application complete.
- An applicant submits to the city or county a preliminary application for a housing development project that is subject to an AB 130 CEQA exemption.
- Require a city or county, instead of identifying any water system whose service area includes the project site, and any water system adjacent to the project site that is a public water system that may supply water for the project when it determines the appropriate environmental review document, to identify the water systems upon receipt of an application that meets the criteria described in 1), above.
- Require, if the city or county is not able to identify any public water system for the project, that the city or county prepare a water supply assessment.
- Require the city or county, within 15 days of receipt of an application that meets 1), to request each public water system identified in 2) to determine whether the projected water demand associated with the proposed project was included in the most recent urban water management plan.
- For housing development projects that are subject to an AB 130 CEQA exemption and projects that are proposed to be permitted pursuant to SB 35 or AB 2011, require the public water system to submit the assessment to the city or county no later than 45 days from the date that the request was received.
- Specify that the governing body of each public water system, or the city or county, if either is required to comply with these water supply planning requirements, is not required to approve the assessment at a public meeting.
- Authorize the city or county to seek a writ of mandamus to compel the public water system to complete with the water supply planning requirements relating to the submission of the water supply assessment if the public water system fails to submit the assessment.
- Specify that the governing body of each public water system, or the city or county, if either is required to comply with these water supply planning requirements, is not required to approve the assessment at a public meeting.
- Delete an obsolete provision relating to the application of these requirements only applying to a project for which a notice of preparation was submitted on or after January 1, 1996.
ARGUMENTS IN SUPPORT
According to the author, “SB 1085 restores an important, long-standing safeguard on water availability for large new developments that was inadvertently circumvented through recent legislation. For more than two decades, state law has required water supply assessments (WSAs) for certain large development projects to strengthen the link between land use planning and water supply planning. These assessments ensure that local governments have a clear, forward-looking understanding of whether sufficient water supplies exist to serve new development alongside existing and planned uses over a 20-year horizon.”
“Because WSAs have been a consistent part of California’s planning framework, communities have largely been able to rely on the expectation that growth would be supported by real, available water supplies. That was not always the case. Prior to these requirements, reliance on “paper water” contributed to serious consequences in some regions, particularly in the Central Valley, where communities experienced water shortages so severe that residents had to rely on bottled water for basic needs.”
“In recent years, the Legislature has appropriately focused on removing barriers to housing development, including through CEQA streamlining and exemptions. However, because WSAs are currently triggered by CEQA, these changes have had the unintended effect of removing this key planning tool for projects that still meet large development thresholds. Without a WSA, cities and counties may lack critical information about water demand and long-term supply reliability.”
“At a time when climate change is increasing pressure on California’s water systems, SB 1085 ensures that this proven planning tool remains in place to support informed decision-making and sustainable growth.”
ARGUMENTS IN OPPOSITION
According to the California Building Industry Association, “while CBIA supports responsible water supply planning, SB 1085 would directly undermine the landmark CEQA reforms the Legislature enacted less than a year ago in AB 130 and SB 131, creating new litigation pathways against housing projects the Legislature specifically sought to protect, and introduce timeline conflicts that make compliance with the state’s streamlined housing approval laws effectively impossible.”
.
.
.
“[AB 130 and SB 131] were designed to get housing approved and built faster by removing unnecessary procedural barriers. SB 1085 would re-attach one of those barriers.”
.
.
.
CBIA argues that requiring a WSA even when a CEQA exemption applies will lead to “challenge[s] to the exemption determination itself, arguing it was invalid because the required WSA was missing or inadequate. This effectively turns the WSA into a standalone litigation weapon against projects … . “
.
.
.
“Even if the lawsuit is ultimately dismissed, the developer faces potentially years of litigation delays. As time elapses, financing terms could expire, construction costs could rise, and the …homes that the Legislature’s streamlining framework was supposed to deliver are delayed or never built.”
.
.
.
“We want to ensure that the legislation does not create new litigation risks, retains the existing legal frameworks for WSAs, does not undermine CEQA exemptions recently approved by the Legislature, and synchronizes the timeframes of WSAs and exempt or streamlined projects. To that end, we would welcome the opportunity to work with the author and the sponsors on amendments that resolve these conflicts.”
COMMENTS
Double referral. This bill is double referred with the Senate Local Government Committee, with this committee being the committee of first referral. Elements of this bill under the jurisdiction of the Senate Local Government Committee are included here for context and completeness only and will be discussed before that Committee.
Purposeful change or unintended side effect? Under existing law, the requirement for a city or county to identify a water system that could serve a proposed large development project is triggered when the city or county determines which environmental review document would be appropriate. However, with the enactment of SB 131 and AB 130, many projects that were previously subject to CEQA, such as advanced manufacturing facilities, maintenance facilities for electrically powered high-speed rail, or certain larger housing development projects, are now exempt. Because a city or county is no longer required to determine the appropriate environmental review document for these projects, it does not activate the requirement to identify the water systems that may supply water for the project.
An argument could be made that by creating the various CEQA exemptions and eliminating various “unnecessary procedural barriers” to certain development projects, the Legislature also intended to eliminate the water supply planning requirements. It is unclear whether this is what the Legislature truly intended as AB 130 and SB 131 were enacted as “budget trailer bills.” Senate and Assembly floor analyses and Senate Floor discussions of AB 130 and SB 131 on June 30, 2025, do not include reference to water supply assessments and the water supply planning requirements. On the other hand, an argument could also be made that when enacting the CEQA exemptions, the Legislature was unaware that CEQA also acted as a trigger for water supply planning requirements.
The removal of this planning tool may leave cities and counties without critical information about the potential water demands of a proposed large development project and whether a water system is able to meet those needs.
Importance of WSAs. WSAs are an important planning tool to help project proponents identify potential water supply issues and avoid water scarcity for the development. According to the Show Me the Water article, the author of the article conducted two surveys, the first in 2004 and the second in 2009, to evaluate how local agencies were responding to the Show Me the Water bills. The first survey involved 59 cities and counties that had reported review activity under SB 221 or SB 610 in a statewide survey conducted earlier that year. Within those jurisdictions, water supply adequacy reviews had been completed for 95 projects. Nine of the 95 projects were initially deemed to have insufficient supplies, and in 7 of those 9 cases, developers were asked to find additional water supplies or modify their project. For the other two projects, the option of augmenting supplies was considered infeasible, and the projects were rejected.
The second survey, completed in 2009, contained similar findings. The survey involved 108 jurisdictions, 96 of which had completed waters supply assessments for 261 projects between 2005 – 2009. According to the Show Me the Water article, only one project in the sample did not proceed because of water supply concerns and nearly 30% of all projects took special measures to introduce conservation, recycled-water, or new water through water transfers. The project that did not go forward was due to a local requirement that all new developments purchase and store 20 years worth of water before getting approval for a water connection. The lack of supplemental water available through the State Water Project for purchase put the project on hold indefinitely.
Thus, it seems that WSAs have aided developers, local jurisdictions, and water agencies to identify water supply issues early in the project development process and sometimes preemptively design “water smart” projects.
Are WSAs duplicative of other water supply planning tools? One may argue that the needed information can be found in an Urban Water Management Plan (UWMP) or that a city or county is required to receive a written Water Supply Verification (WSV) from the applicable public water system that a “sufficient water supply” is available before a final subdivision map can be approved.
UWMPs, which are prepared by urban water suppliers, are plans intended to project water supply and demand over a period of 20 years and are required to be updated every 5 years. Each plan includes a description of how much water the agency has on a reliable basis, how much its needs for the foreseeable future, what the agency’s strategy is for meeting its water needs, the challenges facing the agency, and any other information necessary to provide a general understanding of the agency’s plan. However, a UWMP might not have contemplated a large development project in its latest update.
Written WSVs are required pursuant to the Subdivision Map Act and thus the written WSV requirement only applies when there are subdivisions involved. Therefore, a written WSV would not be required for a residential development of rental units, an advanced manufacturing facility development, a maintenance facility, or commercial facility, as none of these developments involve creating subdivisions. Additionally, as discussed above, the WSV was intended to be a “final check” on water availability for a development, whereas a WSA is intended to start the planning process early to identify any potential water supply issues. The two are meant to complement each other, not have one be a replacement for the other.
Finally, while there may be some instances where the information otherwise provided by a WSA could be covered by a UWMP or a written WSV, there may also be instances where a project has neither. This bill would help capture those projects.
If not now, when? Typically, WSAs can help identify water supply issues early in the process and start conversations on how to address them. Regardless of the type of development involved, and whether CEQA applies, a project developer is going to have to figure out its water supply source and a water system may have to figure out if additional capacity is going to be needed to address that increased demand. If a WSA is not required, will these conversations take place early enough in the planning process to help avoid water supply-related surprises? This consideration may be especially important in the context of large infill housing projects, where existing water infrastructure within an urban development may not be adequate to service the new development. This was the purpose of the “show me the water” bills – to connect land use planning with water use planning.
More than housing. A majority of the arguments raised in opposition are centered around the bill’s impact on housing production. However, this bill extends beyond housing. This bill also reinstates the water supply requirements for large-scale commercial or industrial development, which have the potential to use significant amounts of water.
Invitation to litigate? An argument has been made that requiring a water supply assessment could provide an opportunity for opponents to a development project to delay or stop a project through litigation. There is concern that a project opponent would directly challenge the contents of the WSA itself.
It is unclear if, outside of CEQA, such a right of action exists. Generally, challenges to the adequacy of a water supply assessment have occurred pursuant to CEQA. In California Water Impact Network v. Newhall County Water District, 161 Cal.App.1464 (2008) (California Water), the California Court of Appeal found California Water Impact Network (C-WIN) could not directly challenge the adequacy of a WSA because C-WIN failed to demonstrate that the WSA constitutes a final determination, finding, or decision since the EIR for the project had not yet been certified and that C-WIN failed to exhaust its administrative remedies pursuant to CEQA. The court, noting that “until a public agency makes a ‘final’ decision, the matter is not ripe for judicial review,” reasoned that the WSA is “a technical, informational advisory opinion of the water provider. Though the WSA is required by statute to include an assessment of certain statutorily identified water supply issues and is required to be included in the EIR, the WSA’s role in the EIR process is akin to that of other informational opinions provided by other entities concerning potential environmental impacts.” Because it is the lead agency that ultimately decides whether to accept or reject the water supplier’s analysis and whether water supplies are sufficient for the proposed project, the court concluded that the WSA is not final for the purposes of mandamus review until the lead agency makes a final determination on the sufficiency of water supplies, the CEQA review is complete, and the project is approved.
In O.W.L. Foundation v. City of Rohnert Park, 168 Cal.App.4th 568 (2008) (O.W.L.), a WSA was challenged before the EIR had been certified, but by the time the court considered the matter, the EIR had been certified. In that case, the City of Rohnert Park issued a tentative WSA and, after public comment, adopted a resolution adopting the final WSA. The O.W.L. Foundation challenged that final WSA but before the EIR had been certified. The court, among other things, had to determine whether the court had subject matter jurisdiction to consider a challenge to a WSA before certification and approval of a project. The court in this case emphasized that “the adequacy of a WSA is not subject to judicial challenge until after a lead agency has certified an EIR and approved a project.” What made this case unusual, the court noted, is that by the time the court was called upon to consider the matter, the City had certified an EIR, which was being challenged in another lawsuit. Ultimately, the court decided that it did have the jurisdiction to evaluation the adequacy of the WSA because, by the time the matter was before the court, an EIR which incorporated the final WSA had been certified.
Recently, in City of Vallejo v. City of American Canyon, 117 Cal.App.5th 1112 (2026) (City of Vallejo), the California Court of Appeal held that a neighboring city’s challenge to another city’s WSA, which was incorporated into its certified EIR for an industrial warehouse complex project, was justiciable. The court in City of Vallejo distinguished the case before them from California Water, stating that “unlike the water assessment in California Water, the instant water supply assessment was evaluated by the lead agency, incorporated into the EIR, and certified. Consequently, we are not confronted with the same finality and exhaustion concerns as the California Water court.”
It is worth noting that both the California Water and City of Vallejo cases were challenges alleging violations of CEQA law. The court in the O.W.L. case did determine that the WSA could be challenged, but only because the EIR had been certified. The O.W.L. court highlighted that the court’s conclusion was limited to the unique facts of that case. Thus, case law provides little insight into whether reinstating these water supply planning requirements will invite litigation for these projects. Based on case law, it is unclear if an action exists if CEQA is not in play.
Recent author amendments.
The author has recently amended the bill in an effort to address the opposition’s concern that the timeframes provided under current WSA requirements are not in line with timeframes that are provided in certain streamlined processes such as SB 35, AB 2011, and AB 130. Additionally, the author has met with stakeholders to discuss the concern of WSAs increasing the risk of litigation against housing projects and discussion seeking potential solutions to this concern are ongoing. Usually, issues of housing and litigation are not a core part of this committee’s jurisdiction.
Related legislation
AB 130 (Committee on Budget, Chapter 22, Statutes of 2025), among other things, exempts from CEQA certain housing development projects that are not more than 20 acres, are consistent with the applicable general plan and zoning ordinance, as well as any applicable local coastal program, as specified, and meet other criteria.
SB 131 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2025), among other things, exempts from CEQA agricultural employee housing projects; projects that consist exclusively of a day care center, rural health clinic, nonprofit food bank or food pantry, or facility for advanced manufacturing; and heavy maintenance facilities or other maintenance facility for electrically powered high-speed rail, as provided.
SB 423 (Wiener, Chapter 778, Statutes of 2023), among other things, modifies the objective planning standards that are applied in SB 35 (see below).
AB 2011 (Wicks, Chapter 647, Statutes of 2022) creates the Affordable Housing and High Road Jobs Act of 2022 and makes certain housing development that meets specified objective standards a use by right and subject to one of two streamlined, ministerial review processes.
SB 35 (Wiener, Chapter 366, Statutes of 2017), among other things, subjects multifamily housing developments that satisfy specified planning objective standards to a streamlined, ministerial approval process.
SB 1262 (Pavley, Chapter 594, Statutes of 2016) requires a city or county that determines a project is subject to CEQA to identify any water system whose service area includes the project site and any water system adjacent to the project site.
SB 221 (Kuehl, Chapter 642, Statutes of 2001) prohibits the approval of a tentative map, or a parcel map for which a tentative map was not required, or a development agreement for a subdivision of property of more than 500 dwelling units unless the legislative body of the city or county provides written verification from the applicable public water system that a sufficient water supply is available or will be available before completion of the project.
SB 610 (Costa, Chapter 643, Statutes of 2001) requires a city or county that determines a project is subject to CEQA to identify any public water system that may supply water for the project and to request those public water systems to prepare a specified water supply assessment. If the city or county is not able to identify a public water system, the city or county is required to prepare a water supply assessment.
SUGGESTED AMENDMENTS: none
SUPPORT
Association of California Water Agencies (ACWA)
California Coastkeeper Alliance
California Environmental Voters
California Farm Bureau
California Municipal Utilities Association
California Special Districts Association
California Water Association
City of Sacramento
City of Sacramento Department of Utilities
Clean Earth 4 Kids
Clean Water Action California
Community Water Center
Community Alliance With Family Farmers
Contra Costa Water District
Defenders of Wildlife
East Bay Municipal Utilities District
Friends of the River
Irvine Ranch Water District
Las Virgenes Municipal Water District
Leadership Counsel for Justice & Accountability
Mono Lake Committee
Planning and Conservation League
Rancho California Water District
Regional Water Authority
San Francisco Baykeeper
Santa Clara Valley Water District
Sierra Club California
State Building & Construction Trades Council of California
Trout Unlimited
Unite Here International Union, AFL-CIO
Western Municipal Water District
Wholly H2O
OPPOSITION
California Building Industry Association
-- END --
Ellen Hanak, Show Me The Water Plan: Urban Water Management Plans and California’s Water Supply Adequacy Laws, 4 Golden Gate University Entl. L.J. (2010). ↑
SENATE COMMITTEE ON NATURAL RESOURCES AND WATER
Senator Josh Becker, Chair
2025 - 2026 Regular
Bill No: SB Hearing Date: March 24, 2026
Author: | |||
Version: | Introduced | ||
Urgency: | Fiscal: | ||
Consultant: | |||
Subject: Water supply planning: California Environmental Quality Act determination
SUMMARY
This bill would reinstate a requirement that cities and counties that approve certain large development projects comply with specified water supply planning requirements.
BACKGROUND AND EXISTING LAW
“Show me the water” bills. In response to local land use decisions adversely affecting local water supply agencies, the Legislature enacted SB 610 (Costa, Chapter 643, Statutes of 2001) and SB 221 (Kuehl, Chapter 643, Statutes of 2001). Often referred to as the “show-me-the-water” bills, together these two bills formally linked land use planning with water use planning, and vice versa.
These water supply planning requirements only apply to certain large scale developments and not all “projects” under the California Environmental Quality Act (CEQA) are considered to be “projects” for purposes of these water supply planning requirements. Specially, the water supply requirements apply to the following:
- A residential development of 500 or more units, or a project that would demand an equivalent amount of water as a 500 unit residential development. This also includes a hotel or motel with more than 500 rooms.
- A shopping center or business establishment that employs more than 1,000 people or has more than 500,000 square feet of floor space.
- A commercial office building employing more than 1,000 people or has more than 250,000 square feet of floor space.
- An industrial, manufacturing, or processing plant, or industrial park planned to house more than 1,000 persons, occupying more than 40 acres of land, or having more than 650,000 square feet of floor area.
- A mixed-use project that includes any of the above described projects.
- A proposed development that would account for an increase of 10 percent or more of the number of public water system’s existing service connections if the public water system that would serve the project has fewer than 5,000 service connections.
Today, under these water supply planning requirements, when a city or county determines that one of these larger developments is subject to CEQA, and would require either an environmental impact report (EIR), negative declaration (ND), or mitigated ND, the city or county is required to identify a water system who could serve the site and any water system adjacent to the project site that is a public water system that could supply water for the development. If the city or county is not able to identify such public water systems, the city or county is required to prepare a water assessment.
CEQA. CEQA provides a process for evaluating the environmental effects of a project and includes statutory exemptions, as well as categorical exemptions, in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant environmental effects, the lead agency prepares an ND. If the initial study shows that the project may have significant environmental effects, the lead agency must prepare an EIR.
Legislative efforts to streamline permitting of development. Over the past several years, the Legislature has enacted various CEQA exemptions and ministerial approvals to “speed up” the permitting process of various types of development projects that meet specified requirements, including CEQA exemptions and ministerial approvals for housing, commercial, and industrial developments.
Most recently, the Legislature enacted SB 131 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2025) and AB 130 (Committee on Budget, Chapter 22, Statutes of 2025). SB 131, a Public Resources Budget Trailer Bill for the 2025-26 budget, among other things, exempted from CEQA agricultural employee housing projects; projects that consist exclusively of a day care center, rural health clinic, nonprofit food bank or food pantry, or facility for advanced manufacturing; and heavy maintenance facilities or other maintenance facility for electrically powered high-speed rail, as provided. SB 131 also established a process to review housing development projects that meet all but one eligibility criteria for specified CEQA exemptions (often referred to as a “near-miss”), with specified exemptions. AB 130, a Housing Budget Trailer Bill for the 2025-26 budget, among other things, exempted from CEQA certain housing development projects that are not more than 20 acres, are consistent with the applicable general plan and zoning ordinance, as well as any applicable local coastal program, as specified, and meet other criteria.
Existing law:
- Under water supply planning requirements:
- Requires any city or county that determines a project, as defined below, is subject to CEQA to comply with certain requirements relating to water supply planning. (Water Code (WAT) §§10910 et. seq).
- Defines, for purposes of water supply planning, a “project” as any of the following:
- A proposed residential development of more than 500 dwelling units.
- A proposed shopping center or business establishment employing more than 1,000 persons or having more than 500,000 square feet of floor space.
- A proposed commercial office building employing more than 1,000 persons or having more than 250,000 square feet of floor space.
- A proposed hotel or motel, or both, having more than 500 rooms.
- A proposed industrial, manufacturing, or processing plant, or industrial park planned to house more than 1,000 persons, occupying more than 40 acres of land, or having more than 650,000 square feet of floor area.
- A mixed-use project that includes one or more of the above-described projects.
- A project that would demand an amount of water equivalent to, or greater than, the amount of water required by a 500 dwelling unit project.
- If a public water system has fewer than 5,000 service connections, a proposed residential, business, commercial, hotel or motel, or industrial development that would increase the number of the public water system’s existing service connections by 10 percent or more, or a mixed-use project that would demand any amount of water equivalent to, or greater than, the amount of water required by residential development that would represent an increase of 10 percent or more in the public water system’s existing service connections. (WAT §10913).
- Requires the city or county, at the time it determines whether an EIR, ND, or mitigated ND is required, to identify any water system whose service area includes the project site and any water system adjacent to the project that is, or may become as a result of supplying water to the project identified, a public water system, that may supply water for the project. If the city of county is not able to identify a public water system, the city or county is required to prepare a water assessment, as specified. (WAT §10910(b)).
- Requires any city or county that determines a project, as defined below, is subject to CEQA to comply with certain requirements relating to water supply planning. (Water Code (WAT) §§10910 et. seq).
- Under CEQA, requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare an ND, mitigated ND, or EIR for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines). (Public Resources Code §§21000 et seq.)
PROPOSED LAW
This bill would:
- Require a city or county that approves a project to comply with the above-described water planning supply requirements.
- Require a city or county, instead of identifying any water system whose service area includes the project site, and any water system adjacent to the project site that is a public water system that may supply water for the project when it determines the appropriate environmental review document, to make that determination at the time it determines whether CEQA applies.
- Require, if the city or county is not able to identify any public water system for the project, that the city or county prepare a water assessment.
ARGUMENTS IN SUPPORT
According to the author, “SB 1085 restores an important safeguard on water availability for large new developments that was inadvertently circumvented through recent legislation. For more than two decades, state law has required water supply assessments (WSAs) for certain large development projects to improve the link between land use planning and water supply planning. State law requires a city or county, upon determining that a project is subject to CEQA, to request a WSA from a water supplier if a project meets certain requirements, including that the project be more than 500 residential units or a non-residential project that demands a similar or greater amount of water. The WSA must identify whether the project was accounted for in the water agency’s planning, and if not, whether the water agency will have sufficient water supplies to serve the project in addition to any other existing and planned uses over a 20-year time frame.
In recent years, because of the focus on removing impediments to building housing, there have been a growing number of bills that streamline housing development by eliminating CEQA analysis, as well as legislation that establishes statutory CEQA exemptions for certain types of affordable and infill housing. These efforts have meant that a WSA is no longer required for projects that still meet the large development criteria. Without a WSA, cities and counties reviewing projects may not have sufficient understanding of the water requirements for projects that have the potential for large impacts on water resources.”
ARGUMENTS IN OPPOSITION
According to the California Building Industry Association, “while CBIA supports responsible water supply planning, SB 1085 would directly undermine the landmark CEQA reforms the Legislature enacted less than a year ago in AB 130 and SB 131, creating new litigation pathways against housing projects the Legislature specifically sought to protect, and introduce timeline conflicts that make compliance with the state’s streamlined housing approval laws effectively impossible.
.
.
.
“[AB 130 and SB 131] were designed to get housing approved and built faster by removing unnecessary procedural barriers. SB 1085 would re-attach one of those barriers.”
.
.
.
CBIA argues that requiring a WSA even when a CEQA exemption applies will lead to “challenge[s] to the exemption determination itself, arguing it was invalid because the required WSA was missing or inadequate. This effectively turns the WSA into a standalone litigation weapon against projects … .
.
.
.
“Even if the lawsuit is ultimately dismissed, the developer faces potentially years of litigation delays. As time elapses, financing terms could expire, construction costs could rise, and the …homes that the Legislature’s streamlining framework was supposed to deliver are delayed or never built.
.
.
.
“We want to ensure that the legislation does not create new litigation risks, retains the existing legal frameworks for WSAs, does not undermine CEQA exemptions recently approved by the Legislature, and synchronizes the timeframes of WSAs and exempt or streamlined projects. To that end, we would welcome the opportunity to work with the author and the sponsors on amendments that resolve these conflicts.”
COMMENTS
Double referral. This bill is double referred with the Senate Local Government Committee, with this committee being the committee of first referral. Elements of this bill under the jurisdiction of the Senate Local Government Committee are included here for context and completeness only and will be discussed before that Committee.
Purposeful change or unintended side effect? Under existing law, the requirement for a city or county to identify a water system that could serve a proposed large development project is triggered when the city or county determines which environmental review document would be appropriate. However, with the enactment of SB 131 and AB 130, many projects that were previously subject to CEQA, such as advanced manufacturing facilities, maintenance facilities for electrically powered high-speed rail, or certain larger housing development projects, are now exempt. Because a city or county is no longer required to determine the appropriate environmental review document for these projects, it does not activate the requirement to identify the water systems that may supply water for the project.
An argument could be made that by creating the various CEQA exemptions and eliminating various “unnecessary procedural barriers” to certain development projects, the Legislature also intended to eliminate the water supply planning requirements. It is unclear whether this is what the Legislature truly intended as AB 130 and SB 131 were enacted as “budget trailer bills.” Senate and Assembly floor analyses and Senate Floor discussions of AB 130 and SB 131 on June 30, 2025, do not include reference to water supply assessments and the water supply planning requirements. On the other hand, an argument could also be made that when enacting the CEQA exemptions, the Legislature was unaware that CEQA also acted as a trigger for water supply planning requirements.
The removal of this planning tool may leave cities and counties without critical information about the potential water demands of a proposed large development project and whether a water system is able to meet those needs.
Are WSAs duplicative of other water supply planning tools? One may argue that the needed information can be found in an Urban Water Management Plan (UWMP) or that a city or county is required to receive a written Water Supply Verification (WSV) from the applicable public water system that a “sufficient water supply” is available before a final subdivision map can be approved.
UWMPs, which are prepared by urban water suppliers, are plans intended to project water supply and demand over a period of 20 years and are required to be updated every 5 years. Each plan includes a description of how much water the agency has on a reliable basis, how much its needs for the foreseeable future, what the agency’s strategy is for meeting its water needs, the challenges facing the agency, and any other information necessary to provide a general understanding of the agency’s plan. However, a UWMP might not have contemplated a large development project in its latest update.
Written WSVs are required pursuant to the Subdivision Map Act and thus the written WSV requirement only applies when there are subdivisions involved. Therefore, a written WSV would not be required for a residential development of rental units, an advanced manufacturing facility development, a maintenance facility, or commercial facility, as none of these developments involve creating subdivisions.
While there may be some instances where the information otherwise provided by a WSA could be covered by a UWMP or a written WSV, there may also be instances where a project has neither. This bill would help capture those projects.
If not now, when? As stated in the opposition’s letter, “SB 1085 changes the trigger” and “requires a WSA whenever a city or county makes a determination about a project under [PRC §] 21080.1 – including a determination that the project is exempt from CEQA. In practical terms, any project meeting the size thresholds in Water Code [§]10912 (generally 500 or more residential units, or equivalent commercial demand) would need a WSA regardless of its CEQA status.”
Typically, WSAs can help identify water supply issues early in the process and start conversations on how to address them. Regardless of the type of development involved, and whether CEQA applies, a project developer is going to have to figure out its water supply source and a water system may have to figure out if additional capacity is going to be needed to address that increased demand. If a WSA is not required, will these conversations take place early enough in the planning process to help avoid water supply-related surprises? This was the purpose of the “show me the water” bills – to connect land use planning with water use planning.
More than housing. A majority of the arguments raised in opposition are centered around the bill’s impact on housing production. However, this bill extends beyond housing. This bill also reinstates the water supply requirements for large-scale commercial or industrial development, which have the potential to use significant amounts of water.
Work in progress. Opponents raise various concerns, some of which also involve local planning processes and are outside of this committee’s jurisdiction and some which may require continued conversations with committees of various jurisdictions. These concerns include, among others:
- New litigation pathway against local jurisdictions where a party may challenge the adequacy of the WSA.
- A challenged WSA’s interaction with SB 131’s “near-miss” provisions.
- WSA timelines are inconsistent with streamlined approval timelines.
Should this bill pass out of this committee, some of these issues may be addressed by the Senate Local Government Committee. Other issues may require additional time and conversations to reach a solution. The committee may wish to require the author to continue to work with committee staff on any issues that may impact this committee’s jurisdiction.
Prior, related legislation
AB 130 (Committee on Budget, Chapter 22, Statutes of 2025), among other things, exempted from CEQA certain housing development projects that are not more than 20 acres, are consistent with the applicable general plan and zoning ordinance, as well as any applicable local coastal program, as specified, and meet other criteria.
SB 131 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2025), among other things, exempted from CEQA agricultural employee housing projects; projects that consist exclusively of a day care center, rural health clinic, nonprofit food bank or food pantry, or facility for advanced manufacturing; and heavy maintenance facilities or other maintenance facility for electrically powered high-speed rail, as provided.
SB 1262 (Pavley, Chapter 594, Statutes of 2016) requires a city or county that determines a project is subject to CEQA to identify any water system whose service area includes the project site and any water system adjacent to the project site.
SB 221 (Kuehl, Chapter 642, Statutes of 2001) prohibits the approval of a tentative map, or a parcel map for which a tentative map was not required, or a development agreement for a subdivision of property of more than 500 dwelling units unless the legislative body of the city or county provides written verification from the applicable public water system that a sufficient water supply is available or will be available before completion of the project.
SB 610 (Costa, Chapter 643, Statutes of 2001) requires a city or county that determines a project is subject to CEQA to identify any public water system that may supply water for the project and to request those public water systems to prepare a specified water supply assessment. If the city or county is not able to identify a public water system, the city or county is required to prepare a water supply assessment.
SUGGESTED AMENDMENTS: none
SUPPORT
East Bay Municipal Utilities District (sponsor)
Association of California Water Agencies
California Coastkeeper Alliance
California Municipal Utilities Association
Irvine Ranch Water District
Las Virgenes Municipal Water District
Mono Lake Committee
Rancho California Water District
Unite Here International Union, AFL-CIO
Western Municipal Water District
OPPOSITION
California Building Industry Association
-- END --
Discussed in Hearing
Senate Floor
Assembly Floor
Assembly Standing Committee on Local Government
Assembly Standing Committee on Water, Parks, and Wildlife
Senate Floor
Senate Standing Committee on Local Government
Senate Standing Committee on Natural Resources and Water
Bill Author
Bill Co-Author(s):