SB 1107: School facilities: design-build: shade structures.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2026-09-30
Current Status:
Passed
(2026-09-30: Chaptered by Secretary of State. Chapter 1010, Statutes of 2026.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law authorizes a school district, with the approval of its governing board, to procure design-build contracts for public works projects in excess of $1,000,000, awarding the contract to either the low bid or the best value, as provided. Existing law requires specified information relating to design-build bid proposals to be verified under penalty of perjury.
This bill would authorize a school district, on or before December 31, 2031, and with the approval of its governing board, to procure multiple design-build contracts for comparable shade structure projects at various sites, bundled through a single solicitation, if the total value of the projects exceeds $1,000,000 but does not exceed $10,000,000, awarding the bundled contracts to the lowest bid or the best value. The bill would require each contract awarded through the bundled solicitation to be a separate contract for a single project, as provided. By expanding the crime of perjury, the bill would impose a state-mandated local program.
The Field Act requires the Department of General Services under the police power of the state to supervise the design and construction of any school building or the reconstruction or alteration of or addition to any school building, if not exempted, to ensure that plans and specifications comply with adopted rules and regulations and building standards published in regulations, and to ensure that the work of construction is performed in accordance with the approved plans and specifications for the protection of life and property.
The California Building Standards Code requires that specified buildings, structures, and facilities be accessible to, and useable by, persons with disabilities, including that when alterations or additions are made to existing buildings or facilities, an accessible path of travel to the specific area of alteration or addition is provided.
Existing law limits the cost of complying with the requirement to provide an accessible path of travel to the installation of a free-standing, open-sided shade structure project that meets specified requirements and that is on a school district, county office of education, charter school, or community college campus to 20% of the adjusted construction cost, as defined, of the shade structure project.
This bill would additionally limit the cost of complying with the requirement to provide an accessible path of travel to the installation of a shade structure integrated with playground equipment that meets specified requirements and that is on a school district, county office of education, charter school, or community college campus to 20% of the adjusted construction cost, as defined, of the shade structure project.
This bill would incorporate additional changes to Section 17250.20 of the Education Code proposed by AB 1860 to be operative only if this bill and AB 1860 are enacted and this bill is enacted last.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes a school district, with the approval of its governing board, to procure design-build contracts for public works projects in excess of $1,000,000, awarding the contract to either the low bid or the best value, as provided. Existing law requires specified information relating to design-build bid proposals to be verified under penalty of perjury.
This bill would authorize a school district, on or before December 31, 2031, and with the approval of its governing board, to procure multiple design-build contracts for comparable shade structure projects at various sites, bundled through a single solicitation, if the total value of the projects exceeds $1,000,000 but does not exceed $10,000,000, awarding the bundled contracts to the lowest bid or the best value. The bill would require each contract awarded through the bundled solicitation to be a separate contract for a single project, as provided. By expanding the crime of perjury, the bill would impose a state-mandated local program.
The Field Act requires the Department of General Services under the police power of the state to supervise the design and construction of any school building or the reconstruction or alteration of or addition to any school building, if not exempted, to ensure that plans and specifications comply with adopted rules and regulations and building standards published in regulations, and to ensure that the work of construction is performed in accordance with the approved plans and specifications for the protection of life and property.
The California Building Standards Code requires that specified buildings, structures, and facilities be accessible to, and useable by, persons with disabilities, including that when alterations or additions are made to existing buildings or facilities, an accessible path of travel to the specific area of alteration or addition is provided.
Existing law limits the cost of complying with the requirement to provide an accessible path of travel to the installation of a free-standing, open-sided shade structure project that meets specified requirements and that is on a school district, county office of education, charter school, or community college campus to 20% of the adjusted construction cost, as defined, of the shade structure project.
This bill would additionally limit the cost of complying with the requirement to provide an accessible path of travel to the installation of a shade structure integrated with playground equipment that meets specified requirements and that is on a school district, county office of education, charter school, or community college campus to 20% of the adjusted construction cost, as defined, of the shade structure project.
This bill would incorporate additional changes to Section 17250.20 of the Education Code proposed by AB 1860 to be operative only if this bill and AB 1860 are enacted and this bill is enacted last.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes a school district, with the approval of its governing board, to procure design-build contracts for public works projects in excess of $1,000,000, awarding the contract to either the low bid or the best value, as provided. Existing law requires specified information relating to design-build bid proposals to be verified under penalty of perjury.
This bill would authorize a school district, on or before December 31, 2031, and with the approval of its governing board, to procure multiple design-build contracts for comparable shade structure projects at various sites, bundled through a single solicitation, if the total value of the projects exceeds $1,000,000 but does not exceed $10,000,000, awarding the bundled contracts to the lowest bid or the best value. The bill would require each contract awarded through the bundled solicitation to be a separate contract for a single project, as provided. By expanding the crime of perjury, the bill would impose a state-mandated local program.
The Field Act requires the Department of General Services under the police power of the state to supervise the design and construction of any school building or the reconstruction or alteration of or addition to any school building, if not exempted, to ensure that plans and specifications comply with adopted rules and regulations and building standards published in regulations, and to ensure that the work of construction is performed in accordance with the approved plans and specifications for the protection of life and property.
The California Building Standards Code requires that specified buildings, structures, and facilities be accessible to, and useable by, persons with disabilities, including that when alterations or additions are made to existing buildings or facilities, an accessible path of travel to the specific area of alteration or addition is provided.
Existing law limits the cost of complying with the requirement to provide an accessible path of travel to the installation of a free-standing, open-sided shade structure project that meets specified requirements and that is on a school district, county office of education, charter school, or community college campus to 20% of the adjusted construction cost, as defined, of the shade structure project.
This bill would additionally limit the cost of complying with the requirement to provide an accessible path of travel to the installation of a shade structure integrated with playground equipment that meets specified requirements and that is on a school district, county office of education, charter school, or community college campus to 20% of the adjusted construction cost, as defined, of the shade structure project.
This bill would incorporate additional changes to Section 17250.20 of the Education Code proposed by AB 1860 to be operative only if this bill and AB 1860 are enacted and this bill is enacted last.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes a school district, with the approval of its governing board, to procure design-build contracts for public works projects in excess of $1,000,000, awarding the contract to either the low bid or the best value, as provided. Existing law requires specified information relating to design-build bid proposals to be verified under penalty of perjury.
This bill would authorize a school district, on or before December 31, 2031, and with the approval of its governing board, to procure multiple design-build contracts for comparable shade structure projects at various sites, including, but not limited to, shade structure projects, bundled through a single solicitation, if the total value of the projects exceeds $1,000,000, $1,000,000 but does not exceed $10,000,000, awarding the bundled contracts to the lowest bid or the best value. The bill would require each contract awarded through the bundled solicitation to be a separate contract for a single project, as provided. By expanding the crime of perjury, the bill would impose a state-mandated local program.
The Field Act requires the Department of General Services under the police power of the state to supervise the design and construction of any school building or the reconstruction or alteration of or addition to any school building, if not exempted, to ensure that plans and specifications comply with adopted rules and regulations and building standards published in regulations, and to ensure that the work of construction is performed in accordance with the approved plans and specifications for the protection of life and property.
The California Building Standards Code requires that specified buildings, structures, and facilities be accessible to, and useable by, persons with disabilities, including that when alterations or additions are made to existing buildings or facilities, an accessible path of travel to the specific area of alteration or addition is provided.
Existing law limits the cost of complying with the requirement to provide an accessible path of travel to the installation of a free-standing, open-sided shade structure project that meets specified requirements and that is on a school district, county office of education, charter school, or community college campus to 20% of the adjusted construction cost, as defined, of the shade structure project.
This bill would additionally limit the cost of complying with the requirement to provide an accessible path of travel to the installation of a shade structure integrated with playground equipment that meets specified requirements and that is on a school district, county office of education, charter school, or community college campus to 20% of the adjusted construction cost, as defined, of the shade structure project.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes a school district, with the approval of its governing board, to procure design-build contracts for public works projects in excess of $1,000,000, awarding the contract to either the low bid or the best value, as provided. Existing law requires specified information relating to design-build bid proposals to be verified under penalty of perjury.
This bill would authorize a school district, with the approval of its governing board, to procure multiple design-build contracts for comparable projects at various sites, including, but not limited to, shade structure projects, bundled through a single solicitation, if the total value of the projects exceeds $1,000,000, awarding the bundled contracts to the lowest bid or the best value. The bill would require each contract awarded through the bundled solicitation to be a separate contract for a single project, as provided. By expanding the crime of perjury, the bill would impose a state-mandated local program.
The Field Act requires the Department of General Services under the police power of the state to supervise the design and construction of any school building or the reconstruction or alteration of or addition to any school building, if not exempted, to ensure that plans and specifications comply with adopted rules and regulations and building standards published in regulations, and to ensure that the work of construction is performed in accordance with the approved plans and specifications for the protection of life and property.
The California Building Standards Code requires that specified buildings, structures, and facilities be accessible to, and useable by, persons with disabilities, including that when alterations or additions are made to existing buildings or facilities, an accessible path of travel to the specific area of alteration or addition is provided.
Existing law limits the cost of complying with the requirement to provide an accessible path of travel to the installation of a free-standing, open-sided shade structure project that meets specified requirements and that is on a school district, county office of education, charter school, or community college campus to 20% of the adjusted construction cost, as defined, of the shade structure project.
This bill would additionally limit the cost of complying with the requirement to provide an accessible path of travel to the installation of a shade structure integrated with playground equipment that meets specified requirements and that is on a school district, county office of education, charter school, or community college campus to 20% of the adjusted construction cost, as defined, of the shade structure project.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The Field Act requires the Department of General Services under the police power of the state to supervise the design and construction of any school building or the reconstruction or alteration of or addition to any school building, if not exempted, to ensure that plans and specifications comply with adopted rules and regulations and building standards published in regulations, and to ensure that the work of construction is performed in accordance with the approved plans and specifications for the protection of life and property.
The California Building Standards Code requires that specified buildings, structures, and facilities be accessible to, and useable by, persons with disabilities, including that when alterations or additions are made to existing buildings or facilities, an accessible path of travel to the specific area of alteration or addition is provided.
Existing law limits the cost of complying with the requirement to provide an accessible path of travel to the installation of a free-standing, open-sided shade structure project that meets specified requirements and that is on a school district, county office of education, charter school, or community college campus to 20% of the adjusted construction cost, as defined, of the shade structure project.
This bill would increase the above-described limit on the cost of complying with the requirement to provide an accessible path of travel to a shade structure project to instead be 25% of the adjusted construction cost of the shade structure project.This bill would additionally limit the cost of complying with the requirement to provide an accessible path of travel to the installation of a shade structure integrated with playground equipment that meets specified requirements and that is on a school district, county office of education, charter school, or community college campus to 20% of the adjusted construction cost, as defined, of the shade structure project.
The Field Act requires the Department of General Services under the police power of the state to supervise the design and construction of any school building or the reconstruction or alteration of or addition to any school building, if not exempted, to ensure that plans and specifications comply with adopted rules and regulations and building standards published in regulations, and to ensure that the work of construction is performed in accordance with the approved plans and specifications for the protection of life and property.
The California Building Standards Code requires that specified buildings, structures, and facilities be accessible to, and useable by, persons with disabilities, including that when alterations or additions are made to existing buildings or facilities, an accessible path of travel to the specific area of alteration or addition is provided.
Existing law limits the cost of complying with the requirement to provide an accessible path of travel to a free-standing, open-sided shade structure project that meets specified requirements and that is on a school district, county office of education, charter school, or community college campus to 20% of the adjusted construction cost, as defined, of the shade structure project.
This bill would increase the above-described limit on the cost of complying with the requirement to provide an accessible path of travel to a shade structure project to instead be 25% of the adjusted construction cost of the shade structure project.
(a)(1)A school district, with approval of its governing board, may procure design-build contracts for projects in excess of one million dollars ($1,000,000), awarding the contract to either the low bid or the best value.
(2)On or before December 31, 2031, a school district, with approval of its governing board, may procure multiple design-build contracts for comparable shade structure projects at various sites, bundled through a single solicitation, even if the values of any individual projects are less than one million dollars ($1,000,000) but do not exceed ten million dollars ($10,000,000), if the total value of the projects exceeds one million dollars ($1,000,000), awarding the bundled contracts to either the low bid or the best value. Each contract awarded through a bundled solicitation shall be a separate contract for a single project with an individual contract value, scope of work, location, schedule, design, and construction. A contract entered into on or before December 31, 2031, may be completed after that date.
(b)The school district shall develop guidelines for a standard organizational conflict-of-interest policy, consistent with applicable law, regarding the ability of a person or entity that performs services for the school district relating to the solicitation of a design-build project, to submit a proposal as a design-build entity, or to join a design-build team. This conflict-of-interest policy shall apply to each school district entering into design-build contracts authorized under this chapter.
(c)This chapter shall apply to bid requests issued on or after July 1, 2016.
SEC. 1.5.Section 17250.20 of the Education Code is amended to read:17250.20.(a)(1)A school district, with approval of its governing board, or a county superintendent of schools, may procure design-build contracts for projects in excess of one million dollars ($1,000,000), awarding the contract to either the low bid or the best value.
(2)Notwithstanding any other law, the county superintendent of schools shall have exclusive authority to award design-build contracts pursuant to this chapter on behalf of a county office of education and county board of education.
(3)On or before December 31, 2031, a school district, with approval of its governing board, may procure multiple design-build contracts for comparable shade structure projects at various sites, bundled through a single solicitation, even if the values of any individual projects are less than one million dollars ($1,000,000) but do not exceed ten million dollars ($10,000,000), if the total value of the projects exceeds one million dollars ($1,000,000), awarding the bundled contracts to either the low bid or the best value. Each contract awarded through a bundled solicitation shall be a separate contract for a single project with an individual contract value, scope of work, location, schedule, design, and construction. A contract entered into on or before December 31, 2031, may be completed after that date.
(b)The school district shall develop guidelines for a standard organizational conflict-of-interest policy, consistent with applicable law, regarding the ability of a person or entity that performs services for the school district relating to the solicitation of a design-build project, to submit a proposal as a design-build entity, or to join a design-build team. This conflict-of-interest policy shall apply to each school district entering into design-build contracts authorized under this chapter.
(c)This chapter shall apply to bid requests issued on or after July 1, 2016.
SEC. 2.Section 17671 of the Education Code is amended to read:17671.(a)Projects solely for (1) the installation of shade structures integrated with playground equipment or (2) freestanding, open-sided shade structures, that are included on the Division of the State Architect pre-checked designs list where the adjusted construction cost exceeds the valuation threshold for alterations or additions on a school district, county office of education, charter school, or community college campus shall have the cost of compliance for path of travel improvements required by Section 202.4 of Chapter 11B of Part 2 of Title 24 of the California Code of Regulations limited to 20 percent of the adjusted construction cost of the shade structure project.
(b)For purposes of this section, adjusted construction cost has the same meaning as in Section 202 of Chapter 2 of Part 2 of Title 24 of the California Code of Regulations.
SEC. 3.Section 1.5 of this bill incorporates amendments to Section 17250.20 of the Education Code proposed by both this bill and Assembly Bill 1860. That section of this bill shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2027, (2) each bill amends Section 17250.20 of the Education Code, and (3) this bill is enacted after Assembly Bill 1860, in which case Section 1 of this bill shall not become operative.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)A school district, with approval of its governing board, may procure design-build contracts for projects in excess of one million dollars ($1,000,000), awarding the contract to either the low bid or the best value.
(2)On or before December 31, 2031, a school district, with approval of its governing board, may procure multiple design-build contracts for comparable shade structure projects at various sites, bundled through a single solicitation, even if the values of any individual projects are less than one million dollars ($1,000,000) but do not exceed ten million dollars ($10,000,000), if the total value of the projects exceeds one million dollars ($1,000,000), awarding the bundled contracts to either the low bid or the best value. Each contract awarded through a bundled solicitation shall be a separate contract for a single project with an individual contract value, scope of work, location, schedule, design, and construction. A contract entered into on or before December 31, 2031, may be completed after that date.
(b)The school district shall develop guidelines for a standard organizational conflict-of-interest policy, consistent with applicable law, regarding the ability of a person or entity that performs services for the school district relating to the solicitation of a design-build project, to submit a proposal as a design-build entity, or to join a design-build team. This conflict-of-interest policy shall apply to each school district entering into design-build contracts authorized under this chapter.
(c)This chapter shall apply to bid requests issued on or after July 1, 2016.
SEC. 1.5.Section 17250.20 of the Education Code is amended to read:17250.20.(a)(1)A school district, with approval of its governing board, or a county superintendent of schools, may procure design-build contracts for projects in excess of one million dollars ($1,000,000), awarding the contract to either the low bid or the best value.
(2)Notwithstanding any other law, the county superintendent of schools shall have exclusive authority to award design-build contracts pursuant to this chapter on behalf of a county office of education and county board of education.
(3)On or before December 31, 2031, a school district, with approval of its governing board, may procure multiple design-build contracts for comparable shade structure projects at various sites, bundled through a single solicitation, even if the values of any individual projects are less than one million dollars ($1,000,000) but do not exceed ten million dollars ($10,000,000), if the total value of the projects exceeds one million dollars ($1,000,000), awarding the bundled contracts to either the low bid or the best value. Each contract awarded through a bundled solicitation shall be a separate contract for a single project with an individual contract value, scope of work, location, schedule, design, and construction. A contract entered into on or before December 31, 2031, may be completed after that date.
(b)The school district shall develop guidelines for a standard organizational conflict-of-interest policy, consistent with applicable law, regarding the ability of a person or entity that performs services for the school district relating to the solicitation of a design-build project, to submit a proposal as a design-build entity, or to join a design-build team. This conflict-of-interest policy shall apply to each school district entering into design-build contracts authorized under this chapter.
(c)This chapter shall apply to bid requests issued on or after July 1, 2016.
SEC. 2.Section 17671 of the Education Code is amended to read:17671.(a)Projects solely for (1) the installation of shade structures integrated with playground equipment or (2) freestanding, open-sided shade structures, that are included on the Division of the State Architect pre-checked designs list where the adjusted construction cost exceeds the valuation threshold for alterations or additions on a school district, county office of education, charter school, or community college campus shall have the cost of compliance for path of travel improvements required by Section 202.4 of Chapter 11B of Part 2 of Title 24 of the California Code of Regulations limited to 20 percent of the adjusted construction cost of the shade structure project.
(b)For purposes of this section, adjusted construction cost has the same meaning as in Section 202 of Chapter 2 of Part 2 of Title 24 of the California Code of Regulations.
SEC. 3.Section 1.5 of this bill incorporates amendments to Section 17250.20 of the Education Code proposed by both this bill and Assembly Bill 1860. That section of this bill shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2027, (2) each bill amends Section 17250.20 of the Education Code, and (3) this bill is enacted after Assembly Bill 1860, in which case Section 1 of this bill shall not become operative.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)A school district, with approval of its governing board, may procure design-build contracts for projects in excess of one million dollars ($1,000,000), awarding the contract to either the low bid or the best value.
(2)On or before December 31, 2031, a school district, with approval of its governing board, may procure multiple design-build contracts for comparable shade structure projects at various sites, bundled through a single solicitation, even if the values of any individual projects are less than one million dollars ($1,000,000) but do not exceed ten million dollars ($10,000,000), if the total value of the projects exceeds one million dollars ($1,000,000), awarding the bundled contracts to either the low bid or the best value. Each contract awarded through a bundled solicitation shall be a separate contract for a single project with an individual contract value, scope of work, location, schedule, design, and construction. A contract entered into on or before December 31, 2031, may be completed after that date.
(b)The school district shall develop guidelines for a standard organizational conflict-of-interest policy, consistent with applicable law, regarding the ability of a person or entity that performs services for the school district relating to the solicitation of a design-build project, to submit a proposal as a design-build entity, or to join a design-build team. This conflict-of-interest policy shall apply to each school district entering into design-build contracts authorized under this chapter.
(c)This chapter shall apply to bid requests issued on or after July 1, 2016.
SEC. 1.5.Section 17250.20 of the Education Code is amended to read:17250.20.(a)(1)A school district, with approval of its governing board, or a county superintendent of schools, may procure design-build contracts for projects in excess of one million dollars ($1,000,000), awarding the contract to either the low bid or the best value.
(2)Notwithstanding any other law, the county superintendent of schools shall have exclusive authority to award design-build contracts pursuant to this chapter on behalf of a county office of education and county board of education.
(3)On or before December 31, 2031, a school district, with approval of its governing board, may procure multiple design-build contracts for comparable shade structure projects at various sites, bundled through a single solicitation, even if the values of any individual projects are less than one million dollars ($1,000,000) but do not exceed ten million dollars ($10,000,000), if the total value of the projects exceeds one million dollars ($1,000,000), awarding the bundled contracts to either the low bid or the best value. Each contract awarded through a bundled solicitation shall be a separate contract for a single project with an individual contract value, scope of work, location, schedule, design, and construction. A contract entered into on or before December 31, 2031, may be completed after that date.
(b)The school district shall develop guidelines for a standard organizational conflict-of-interest policy, consistent with applicable law, regarding the ability of a person or entity that performs services for the school district relating to the solicitation of a design-build project, to submit a proposal as a design-build entity, or to join a design-build team. This conflict-of-interest policy shall apply to each school district entering into design-build contracts authorized under this chapter.
(c)This chapter shall apply to bid requests issued on or after July 1, 2016.
SEC. 2.Section 17671 of the Education Code is amended to read:17671.(a)Projects solely for (1) the installation of shade structures integrated with playground equipment or (2) freestanding, open-sided shade structures, that are included on the Division of the State Architect pre-checked designs list where the adjusted construction cost exceeds the valuation threshold for alterations or additions on a school district, county office of education, charter school, or community college campus shall have the cost of compliance for path of travel improvements required by Section 202.4 of Chapter 11B of Part 2 of Title 24 of the California Code of Regulations limited to 20 percent of the adjusted construction cost of the shade structure project.
(b)For purposes of this section, adjusted construction cost has the same meaning as in Section 202 of Chapter 2 of Part 2 of Title 24 of the California Code of Regulations.
SEC. 3.Section 1.5 of this bill incorporates amendments to Section 17250.20 of the Education Code proposed by both this bill and Assembly Bill 1860. That section of this bill shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2027, (2) each bill amends Section 17250.20 of the Education Code, and (3) this bill is enacted after Assembly Bill 1860, in which case Section 1 of this bill shall not become operative.
SEC. 3.SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)A school district, with approval of its governing board, may procure design-build contracts for projects in excess of one million dollars ($1,000,000), awarding the contract to either the low bid or the best value.
(2)A On or before December 31, 2031, a school district, with approval of its governing board, may procure multiple design-build contracts for comparable shade structure projects at various sites, including, but not limited to, shade structure projects, bundled through a single solicitation, even if the values of any individual projects are less than one million dollars ($1,000,000), ($1,000,000) but do not exceed ten million dollars ($10,000,000), if the total value of the projects exceeds one million dollars ($1,000,000), awarding the bundled contracts to either the low bid or the best value. Each contract awarded through a bundled solicitation shall be a separate contract for a single project with an individual contract value, scope of work, location, schedule, design, and construction. A contract entered into on or before December 31, 2031, may be completed after that date.
(b)The school district shall develop guidelines for a standard organizational conflict-of-interest policy, consistent with applicable law, regarding the ability of a person or entity that performs services for the school district relating to the solicitation of a design-build project, to submit a proposal as a design-build entity, or to join a design-build team. This conflict-of-interest policy shall apply to each school district entering into design-build contracts authorized under this chapter.
(c)This chapter shall apply to bid requests issued on or after July 1, 2016.
SEC. 2.Section 17671 of the Education Code is amended to read:17671.(a)Projects solely for (1) the installation of shade structures integrated with playground equipment or (2) freestanding, open-sided shade structures, that are included on the Division of the State Architect pre-checked designs list where the adjusted construction cost exceeds the valuation threshold for alterations or additions on a school district, county office of education, charter school, or community college campus shall have the cost of compliance for path of travel improvements required by Section 202.4 of Chapter 11B of Part 2 of Title 24 of the California Code of Regulations limited to 20 percent of the adjusted construction cost of the shade structure project.
(b)For purposes of this section, adjusted construction cost has the same meaning as in Section 202 of Chapter 2 of Part 2 of Title 24 of the California Code of Regulations.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)A school district, with approval of its governing board, may procure design-build contracts for projects in excess of one million dollars ($1,000,000), awarding the contract to either the low bid or the best value.
(2)A school district, with approval of its governing board, may procure multiple design-build contracts for comparable projects at various sites, including, but not limited to, shade structure projects, bundled through a single solicitation, even if the values of any individual projects are less than one million dollars ($1,000,000), if the total value of the projects exceeds one million dollars ($1,000,000), awarding the bundled contracts to either the low bid or the best value. Each contract awarded through a bundled solicitation shall be a separate contract for a single project with an individual contract value, scope of work, location, schedule, design, and construction.
(b)The school district shall develop guidelines for a standard organizational conflict-of-interest policy, consistent with applicable law, regarding the ability of a person or entity that performs services for the school district relating to the solicitation of a design-build project, to submit a proposal as a design-build entity, or to join a design-build team. This conflict-of-interest policy shall apply to each school district entering into design-build contracts authorized under this chapter.
(c)This chapter shall apply to bid requests issued on or after July 1, 2016.
SECTION 1.SEC. 2.Section 17671 of the Education Code is amended to read:17671.(a)Projects solely for (1) the installation of shade structures integrated with playground equipment or (2) freestanding, open-sided shade structures, that are included on the Division of the State Architect pre-checked designs list where the adjusted construction cost exceeds the valuation threshold for alterations or additions on a school district, county office of education, charter school, or community college campus shall have the cost of compliance for path of travel improvements required by Section 202.4 of Chapter 11B of Part 2 of Title 24 of the California Code of Regulations limited to 20 percent of the adjusted construction cost of the shade structure project.
(b)For purposes of this section, adjusted construction cost has the same meaning as in Section 202 of Chapter 2 of Part 2 of Title 24 of the California Code of Regulations.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)Projects solely for (1) the installation of shade structures integrated with playground equipment or (2) freestanding, open-sided shade structures structures, that are included on the Division of the State Architect pre-checked designs list where the adjusted construction cost exceeds the valuation threshold for alterations or additions on a school district, county office of education, charter school, or community college campus shall have the cost of compliance for path of travel improvements required by Section 202.4 of Chapter 11B of Part 2 of Title 24 of the California Code of Regulations limited to 25 20 percent of the adjusted construction cost of the shade structure project.
(b)For purposes of this section, adjusted construction cost has the same meaning as in Section 202 of Chapter 2 of Part 2 of Title 24 of the California Code of Regulations.
It is the intent of the Legislature to enact subsequent legislation to increase the affordability of installing heat-reducing shade structures on a school district, county office of education, charter school, or community college campus.
SEC. 2.Section 17671 of the Education Code is amended to read:17671.(a)Projects solely for the installation of freestanding, open-sided shade structures included on the Division of the State Architect pre-checked designs list where the adjusted construction cost exceeds the valuation threshold for alterations or additions on a school district, county office of education, charter school, or community college campus shall have the cost of compliance for path of travel improvements required by Section 202.4 of Chapter 11B of Part 2 of Title 24 of the California Code of Regulations limited to 20 25 percent of the adjusted construction cost of the shade structure project.
(b)For purposes of this section, adjusted construction cost has the same meaning as in Section 202 of Chapter 2 of Part 2 of Title 24 of the California Code of Regulations.
|
Date
|
Status
|
|---|---|
| Sep 30, 2026 | Chaptered by Secretary of State. Chapter 1010, Statutes of 2026. |
| Sep 30, 2026 | Approved by the Governor. |
| Sep 3, 2026 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 27, 2026 | Assembly amendments concurred in. (Ayes 37. Noes 0. Page 6026.) Ordered to engrossing and enrolling. |
| Aug 27, 2026 | Assembly amendments concurred in. (Ayes 36. Noes 0.) Ordered to engrossing and enrolling. |
| Aug 26, 2026 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 26, 2026 | Read third time. Passed. (Ayes 79. Noes 0. Page 6617.) Ordered to the Senate. |
| Aug 26, 2026 | Read third time. Passed. Ordered to the Senate. |
| Aug 17, 2026 | Read second time. Ordered to third reading. |
| Aug 13, 2026 | Read second time and amended. Ordered to second reading. |
| Aug 13, 2026 | From committee: Do pass as amended. (Ayes 11. Noes 0.) (August 13). |
| Aug 13, 2026 | Assembly Rule 63 suspended. |
| Aug 5, 2026 | August 5 set for first hearing. Placed on suspense file. |
| Jul 2, 2026 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 2, 2026 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 8. Noes 0.) (July 1). |
| Jun 12, 2026 | June 17 set for first hearing canceled at the request of author. |
| Jun 8, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on ED. |
| May 11, 2026 | Referred to Com. on ED. |
| Apr 23, 2026 | In Assembly. Read first time. Held at Desk. |
| Apr 23, 2026 | Read third time. Passed. (Ayes 37. Noes 0. Page 4034.) Ordered to the Assembly. |
| Apr 23, 2026 | Read third time. Passed. (Ayes 37. Noes 0.) Ordered to the Assembly. |
| Apr 21, 2026 | Read second time. Ordered to consent calendar. |
| Apr 20, 2026 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8 and ordered to consent calendar. |
| Apr 10, 2026 | Set for hearing April 20. |
| Apr 8, 2026 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To consent calendar. (Ayes 7. Noes 0. Page 3791.) (April 8). Re-referred to Com. on APPR. |
| Apr 8, 2026 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To consent calendar. (Ayes 7. Noes 0.) (April 8). Re-referred to Com. on APPR. |
| Mar 23, 2026 | Set for hearing April 8. |
| Mar 23, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on ED. |
| Feb 26, 2026 | Referred to Com. on ED. |
| Feb 18, 2026 | From printer. May be acted upon on or after March 20. |
| Feb 17, 2026 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 27, 2026 | Unfinished Business SB1107 Stern Concurrence | Senate Floor |
Passed |
|
| Aug 26, 2026 | SB 1107 Stern Senate Third Reading By Schiavo | Assembly Floor |
Passed |
|
| Aug 13, 2026 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jul 1, 2026 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Education |
Passed |
|
| Apr 23, 2026 | Consent Calendar 2nd SB1107 Stern | Senate Floor |
Passed |
|
| Apr 8, 2026 | Do pass, but first be re-referred to the Committee on [Appropriations] with the recommendation: To Consent Calendar | Senate Standing Committee on Education |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| California School Boards Association | ** Support | |
| California State PTA | ** Support | |
| Center for Ecoliteracy | ** Support | |
| Elders Climate Action Northern CA Chapter | ** Support | |
| Elders Climate Action Southern CA Chapter | ** Support | |
| Los Angeles Unified School District | ** Support | |
| Natural Resources Defense Council | ** Support | |
| Sacramento Splash | ** Support | |
| Ten Strands | ** Support | |
| UndauntedK12 | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 1107 |
UNFINISHED BUSINESS
Bill No: SB 1107
Author: Stern (D)
Amended: 8/13/26
Vote: 21
SENATE EDUCATION COMMITTEE: 7-0, 4/8/26
AYES: Pérez, Ochoa Bogh, Cabaldon, Choi, Cortese, Gonzalez, Reyes
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SENATE FLOOR: 37-0, 4/23/26 (Consent)
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Padilla, Pérez, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Weber Pierson, Wiener
NO VOTE RECORDED: Ochoa Bogh, Reyes, Wahab
ASSEMBLY FLOOR: 79-0, 8/26/26 - See last page for vote
SUBJECT: School facilities: design-build: shade structures
SOURCE: Los Angeles Unified School District
DIGEST:
This bill authorizes school districts to bundle multiple comparable shade structure projects at different sites into a single design-build solicitation, subject to specified requirements, and expands an existing exemption from accessible path-of-travel requirements under the California Building Standards Code for certain freestanding shade structures to also apply to shade structures that are integrated into playground equipment.
Assembly Amendments
authorize school districts, until January 1, 2032, to bundle multiple comparable shade structure projects at different sites into a single design-build solicitation when the combined value of the projects exceeds $1 million, even if individual projects are below the $1 million threshold for use of design-build, and make related chaptering amendments.
ANALYSIS:
Existing law:
1) Defines “construction or alteration” for purposes of school facilities projects to include any construction, reconstruction, or alteration of, or addition to, any school building.
2) Requires the Department of General Services (DGS) to pass upon and approve or reject all plans for the construction or, if the estimated cost exceeds $100,000, the alteration of any school building.
3) Generally requires the governing board of each school and community college district, before adopting construction or alteration plans, to submit the plans to DGS for approval and pay all associated fees.
4) Requires construction projects over $209,208 (cost threshold) to provide “an accessible path of travel” from the building entrance to the project location.
5) Specifies that an area that has been altered without providing an accessible path of travel to that area, and subsequent alterations of that area or a different area on the same path of travel are undertaken within three years of the original alteration, the total cost of alterations for the preceding three-year period shall be considered in determining whether the cost threshold has been met.
6) Limits the cost of complying with the requirement to provide an accessible path of travel to a free-standing, open-sided shade structure project to 20% of the adjusted construction cost, as defined, of the shade structure project.
7) Authorizes a school district, with the approval of its governing board, to use the design-build procurement process for public works projects in excess of $1 million and to award a design-build contract to either the low bid or the best value, as specified.
This bill:
- Authorizes a school district, until January 1, 2032, with the approval of its governing board, to bundle multiple comparable shade structure projects at different sites through a single design-build solicitation if the combined value of the projects exceeds $1 million, even if an individual project is valued at less than $1 million, provided that no individual project exceeds $10 million.
- Requires each project awarded through a bundled solicitation to be a separate contract with an individual contract value, scope of work, location, schedule, design, and construction, and authorizes a contract entered into by December 31, 2031, to be completed after that date.
- Expands an existing exemption from accessible path-of-travel requirements under the Building Code for certain freestanding shade structures to also apply to integrated shade structures attached to playground equipment that are included on DSA’s approved pre-check design list.
Comments
1) Need for the bill. According to the author, “Spending time outside plays a vital role in supporting children’s overall health and academic achievement. Regular access to outdoor environments can reduce stress and inattentiveness while strengthening cognitive growth and emotional well-being. However, students in urban areas face greater exposure to extreme temperatures, which can undermine the benefits of outdoor play by increasing their vulnerability to heat-related illnesses and diminishing their ability to focus and learn. Proper shading structures are essential to lower surrounding temperatures and protect children from dangerous heat.
“We are proud to continue the important work SB 515 had started by expanding its provisions to include overheard playground structure shading, further empowering our schools to quickly and cost-effectively provide schoolyard shading that keeps our children cool while they play.”
2) Plan review for construction projects. The DSA reviews plans for public school construction and certain other state-funded building projects to ensure that plans, specifications, and construction comply with California’s building codes (Title 24 of the California Code of Regulations). The majority of DSA’s plan review and construction oversight focuses on new construction and alteration projects for California school and community college districts. DSA’s plan review ensures the project’s compliance with code requirements related to:
a) Structural safety, ensuring that facilities meet the high standards set in the Field Act to withstand an earthquake.
b) Fire and life safety, addressing the safety of occupants in buildings, as related to fire resistive building materials, fire alarms, fire suppression equipment, safe occupant egress, and firefighting equipment access.
c) Access compliance, ensuring that public schools and state-funded construction projects meet accessibility requirements for people with disabilities.
d) Energy efficiency, including compliance with applicable California Green Building Standards Code requirements for sustainability.
3) The Field Act. All school facilities must be built in compliance with specified earthquake safety standards, commonly known as the “Field Act.” The Field Act was enacted following a severe earthquake in Long Beach in 1933. The Field Act requires a comprehensive design specification and construction inspection process for K-12 public school educational facilities. Community college facilities may be constructed in accordance with either the Field Act or the Building Code.
The Field Act requires the DSA (within DGS) to review the construction plans for school buildings and requires school districts to hire onsite construction inspectors to ensure compliance with the structural safety standards. School and community college construction contracts may only be awarded after DSA approval of the plans and specifications on which the contracts are based.
4) State Architect’s pre-check approval process. The DSA maintains a pre-check design list that includes over 25 “off the shelf” shade structures that schools and community colleges can install according to an expedited review and approval process. The pre-check approval process is intended to streamline DSA plan review by providing a procedure for approving the design of commonly used structures prior to the submittal of plans to DSA for construction projects. The pre-check approval process allows designers to incorporate designs for structures that have already been “pre-checked” by DSA into their plans for actual site-specific construction projects.
5) Bundling shade structure projects for design-build procurement. Existing law generally authorizes a school district to use design-build procurement for public works projects exceeding $1 million. The Assembly amendments authorize a school district undertaking multiple comparable shade structure projects at different sites to bundle those projects through a single design-build solicitation if their combined value exceeds $1 million, even if individual projects are valued at less than $1 million. Each project must remain a separate contract with its own contract value, scope of work, location, schedule, design, and construction.
This approach may be particularly useful for districts seeking to install similar shade structures across multiple campuses. Bundling comparable projects could allow districts to reduce administrative costs, achieve economies of scale, and make design-build available for shade projects that would otherwise fall below the statutory threshold. The authority sunsets at the end of 2031, providing an opportunity to assess whether this approach reduces the cost or time associated with installing shade structures before considering whether it should be continued or applied more broadly.
6) Expanding SB 515’s exemption for shade structures. SB 515 (Stern, Chapter 489, Statutes of 2023) created a narrow exception to accessible path-of-travel requirements under the Building Code for freestanding, open-sided shade structures included DSA’s pre-check design list. That measure was intended to reduce project costs and facilitate the installation of shade structures on school campuses in response to increasing concerns about extreme heat exposure for students during outdoor activity.
Under the Building Code, alterations to existing school facilities that exceed a specified valuation threshold (currently $209,208) must also include the provision of an accessible path of travel to the area being altered. Smaller projects that fall below the valuation threshold are generally exempt from these requirements. However, if additional projects or repairs at the same campus within a three-year period cause the cumulative cost of alterations to exceed the threshold, the path-of-travel improvements may be required retroactively for the earlier project. According to the author, this framework may result in relatively small projects, such as playground shade structures, triggering broader accessibility upgrades if other campus work has occurred during the prior three years.
This bill proposes to extend the exemption created by SB 515 to integrated shade structures attached to playground equipment, allowing these projects to remain subject to the 20% path-of-travel cap regardless of whether the valuation threshold would otherwise be exceeded.
7) Balancing climate adaptation with accessibility improvements. School districts and advocates increasingly view playground shade structures as an important strategy for protecting students from extreme heat during outdoor activity. For example, Los Angeles Unified School District (LAUSD) reports that approximately 380 schools lack shade over play structures. With a $40 million budget dedicated to shade shelters, LAUSD estimates it can install structures at approximately 49 schools, prioritizing campuses using its Student Equity Need Index to target investments toward communities most vulnerable to extreme heat. According to LAUSD, reducing project costs associated with accessibility triggers allows available funding to reach a greater number of campuses.
At the same time, accessible path-of-travel requirements serve an important policy purpose: ensuring that accessibility improvements are incorporated into existing school facilities over time as campuses undergo alterations. For students, staff, and visitors who use wheelchairs or have other mobility challenges, these incremental upgrades can determine whether new or improved spaces on campus are reachable. Expanding exemptions from these requirements may allow new amenities to be installed without triggering broader accessibility improvements that might otherwise occur during facility upgrades. As the Committee considers expanding the exemption created by SB 515, it may wish to weigh the benefits of facilitating additional shade installations against the potential for fewer accessibility improvements to be made on aging school campuses.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee:
- Ongoing General Fund costs of $1.1 million for the Labor Commissioner's Office (under the Department of Industrial Relations (DIR)) to accommodate the additional number of projects subject to enforcement of skilled and trained workforce requirements by the Division of Labor Standards Enforcement. According to DIR, under existing law, school districts are required to use a skilled and trained workforce to perform all work for design-build projects or contracts that fall within an apprenticeable occupation in the building and construction trades.
- Minor and absorbable costs to the Division of the State Architect (DSA) within the Department of General Services (DGS).
SUPPORT: (Verified 8/26/26)
Los Angeles Unified School District (source)
OPPOSITION: (Verified 8/26/26)
ASSEMBLY FLOOR: 79-0 8/26/26
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Castillo, Chen, Connolly, Davies, DeMaio, Dixon, Elhawary, Ellis, Flora, Fong, Gabriel, Garcia, Gipson, Jeff Gonzalez, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Johnson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Sanchez, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ta, Tangipa, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
Prepared by: Ian Johnson / ED. / (916) 651-4105
9/22/26 11:44:40
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 1107 |
UNFINISHED BUSINESS
Bill No: SB 1107
Author: Stern (D)
Amended: 8/13/26
Vote: 21
SENATE EDUCATION COMMITTEE: 7-0, 4/8/26
AYES: Pérez, Ochoa Bogh, Cabaldon, Choi, Cortese, Gonzalez, Reyes
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SENATE FLOOR: 37-0, 4/23/26 (Consent)
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Padilla, Pérez, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Weber Pierson, Wiener
NO VOTE RECORDED: Ochoa Bogh, Reyes, Wahab
ASSEMBLY FLOOR: Passed, 8/26/26
SUBJECT: School facilities: shade structures
SOURCE: Los Angeles Unified School District
DIGEST:
This bill authorizes school districts to bundle multiple comparable shade structure projects at different sites into a single design-build solicitation, subject to specified requirements, and expands an existing exemption from accessible path-of-travel requirements under the California Building Standards Code for certain freestanding shade structures to also apply to shade structures that are integrated into playground equipment.
Assembly Amendments
authorize school districts, until January 1, 2032, to bundle multiple comparable shade structure projects at different sites into a single design-build solicitation when the combined value of the projects exceeds $1 million, even if individual projects are below the $1 million threshold for use of design-build, and make related chaptering amendments.
ANALYSIS:
Existing law:
1) Defines “construction or alteration” for purposes of school facilities projects to include any construction, reconstruction, or alteration of, or addition to, any school building.
2) Requires the Department of General Services (DGS) to pass upon and approve or reject all plans for the construction or, if the estimated cost exceeds $100,000, the alteration of any school building.
3) Generally requires the governing board of each school and community college district, before adopting construction or alteration plans, to submit the plans to DGS for approval and pay all associated fees.
4) Requires construction projects over $209,208 (cost threshold) to provide “an accessible path of travel” from the building entrance to the project location.
5) Specifies that an area that has been altered without providing an accessible path of travel to that area, and subsequent alterations of that area or a different area on the same path of travel are undertaken within three years of the original alteration, the total cost of alterations for the preceding three-year period shall be considered in determining whether the cost threshold has been met.
6) Limits the cost of complying with the requirement to provide an accessible path of travel to a free-standing, open-sided shade structure project to 20% of the adjusted construction cost, as defined, of the shade structure project.
7) Authorizes a school district, with the approval of its governing board, to use the design-build procurement process for public works projects in excess of $1 million and to award a design-build contract to either the low bid or the best value, as specified.
This bill:
- Authorizes a school district, until January 1, 2032, with the approval of its governing board, to bundle multiple comparable shade structure projects at different sites through a single design-build solicitation if the combined value of the projects exceeds $1 million, even if an individual project is valued at less than $1 million, provided that no individual project exceeds $10 million.
- Requires each project awarded through a bundled solicitation to be a separate contract with an individual contract value, scope of work, location, schedule, design, and construction, and authorizes a contract entered into by December 31, 2031, to be completed after that date.
- Expands an existing exemption from accessible path-of-travel requirements under the Building Code for certain freestanding shade structures to also apply to integrated shade structures attached to playground equipment that are included on DSA’s approved pre-check design list.
Comments
1) Need for the bill. According to the author, “Spending time outside plays a vital role in supporting children’s overall health and academic achievement. Regular access to outdoor environments can reduce stress and inattentiveness while strengthening cognitive growth and emotional well-being. However, students in urban areas face greater exposure to extreme temperatures, which can undermine the benefits of outdoor play by increasing their vulnerability to heat-related illnesses and diminishing their ability to focus and learn. Proper shading structures are essential to lower surrounding temperatures and protect children from dangerous heat.
“We are proud to continue the important work SB 515 had started by expanding its provisions to include overheard playground structure shading, further empowering our schools to quickly and cost-effectively provide schoolyard shading that keeps our children cool while they play.”
2) Plan review for construction projects. The DSA reviews plans for public school construction and certain other state-funded building projects to ensure that plans, specifications, and construction comply with California’s building codes (Title 24 of the California Code of Regulations). The majority of DSA’s plan review and construction oversight focuses on new construction and alteration projects for California school and community college districts. DSA’s plan review ensures the project’s compliance with code requirements related to:
a) Structural safety, ensuring that facilities meet the high standards set in the Field Act to withstand an earthquake.
b) Fire and life safety, addressing the safety of occupants in buildings, as related to fire resistive building materials, fire alarms, fire suppression equipment, safe occupant egress, and firefighting equipment access.
c) Access compliance, ensuring that public schools and state-funded construction projects meet accessibility requirements for people with disabilities.
d) Energy efficiency, including compliance with applicable California Green Building Standards Code requirements for sustainability.
3) The Field Act. All school facilities must be built in compliance with specified earthquake safety standards, commonly known as the “Field Act.” The Field Act was enacted following a severe earthquake in Long Beach in 1933. The Field Act requires a comprehensive design specification and construction inspection process for K-12 public school educational facilities. Community college facilities may be constructed in accordance with either the Field Act or the Building Code.
The Field Act requires the DSA (within DGS) to review the construction plans for school buildings and requires school districts to hire onsite construction inspectors to ensure compliance with the structural safety standards. School and community college construction contracts may only be awarded after DSA approval of the plans and specifications on which the contracts are based.
4) State Architect’s pre-check approval process. The DSA maintains a pre-check design list that includes over 25 “off the shelf” shade structures that schools and community colleges can install according to an expedited review and approval process. The pre-check approval process is intended to streamline DSA plan review by providing a procedure for approving the design of commonly used structures prior to the submittal of plans to DSA for construction projects. The pre-check approval process allows designers to incorporate designs for structures that have already been “pre-checked” by DSA into their plans for actual site-specific construction projects.
5) Bundling shade structure projects for design-build procurement. Existing law generally authorizes a school district to use design-build procurement for public works projects exceeding $1 million. The Assembly amendments authorize a school district undertaking multiple comparable shade structure projects at different sites to bundle those projects through a single design-build solicitation if their combined value exceeds $1 million, even if individual projects are valued at less than $1 million. Each project must remain a separate contract with its own contract value, scope of work, location, schedule, design, and construction.
This approach may be particularly useful for districts seeking to install similar shade structures across multiple campuses. Bundling comparable projects could allow districts to reduce administrative costs, achieve economies of scale, and make design-build available for shade projects that would otherwise fall below the statutory threshold. The authority sunsets at the end of 2031, providing an opportunity to assess whether this approach reduces the cost or time associated with installing shade structures before considering whether it should be continued or applied more broadly.
6) Expanding SB 515’s exemption for shade structures. SB 515 (Stern, Chapter 489, Statutes of 2023) created a narrow exception to accessible path-of-travel requirements under the Building Code for freestanding, open-sided shade structures included DSA’s pre-check design list. That measure was intended to reduce project costs and facilitate the installation of shade structures on school campuses in response to increasing concerns about extreme heat exposure for students during outdoor activity.
Under the Building Code, alterations to existing school facilities that exceed a specified valuation threshold (currently $209,208) must also include the provision of an accessible path of travel to the area being altered. Smaller projects that fall below the valuation threshold are generally exempt from these requirements. However, if additional projects or repairs at the same campus within a three-year period cause the cumulative cost of alterations to exceed the threshold, the path-of-travel improvements may be required retroactively for the earlier project. According to the author, this framework may result in relatively small projects, such as playground shade structures, triggering broader accessibility upgrades if other campus work has occurred during the prior three years.
This bill proposes to extend the exemption created by SB 515 to integrated shade structures attached to playground equipment, allowing these projects to remain subject to the 20% path-of-travel cap regardless of whether the valuation threshold would otherwise be exceeded.
7) Balancing climate adaptation with accessibility improvements. School districts and advocates increasingly view playground shade structures as an important strategy for protecting students from extreme heat during outdoor activity. For example, Los Angeles Unified School District (LAUSD) reports that approximately 380 schools lack shade over play structures. With a $40 million budget dedicated to shade shelters, LAUSD estimates it can install structures at approximately 49 schools, prioritizing campuses using its Student Equity Need Index to target investments toward communities most vulnerable to extreme heat. According to LAUSD, reducing project costs associated with accessibility triggers allows available funding to reach a greater number of campuses.
At the same time, accessible path-of-travel requirements serve an important policy purpose: ensuring that accessibility improvements are incorporated into existing school facilities over time as campuses undergo alterations. For students, staff, and visitors who use wheelchairs or have other mobility challenges, these incremental upgrades can determine whether new or improved spaces on campus are reachable. Expanding exemptions from these requirements may allow new amenities to be installed without triggering broader accessibility improvements that might otherwise occur during facility upgrades. As the Committee considers expanding the exemption created by SB 515, it may wish to weigh the benefits of facilitating additional shade installations against the potential for fewer accessibility improvements to be made on aging school campuses.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee:
- Ongoing General Fund costs of $1.1 million for the Labor Commissioner's Office (under the Department of Industrial Relations (DIR)) to accommodate the additional number of projects subject to enforcement of skilled and trained workforce requirements by the Division of Labor Standards Enforcement. According to DIR, under existing law, school districts are required to use a skilled and trained workforce to perform all work for design-build projects or contracts that fall within an apprenticeable occupation in the building and construction trades.
- Minor and absorbable costs to the Division of the State Architect (DSA) within the Department of General Services (DGS).
SUPPORT: (Verified 8/26/26)
Los Angeles Unified School District (source)
OPPOSITION: (Verified 8/26/26)
Prepared by: Ian Johnson / ED. / (916) 651-4105
8/26/26 16:22:12
**** END ****
SENATE THIRD READING
STR Bill Id:SB 1107
Author:(Stern)
As Amended Ver:August 13, 2026
Majority vote
SUMMARY
Authorizes a school district, with approval of its governing board, through December 31, 2031, to procure multiple design-build contracts for comparable shade structure projects at multiple sites through a bundled single solicitation, if the cumulative project value exceeds $1 million, but is not more than $10 million, even if individual projects within the bundle total less than $1 million.
Major Provisions
- Authorizes that projects solely for the installation of shade structures integrated with playground equipment included on the Division of the State Architect (DSA) approved pre-checked design list, that do not exceed the valuation threshold for alterations, structural repairs, or additions to existing buildings, on a school district, county office of education (COE), charter school, or community college campus are not required to comply with specified sections of the California Code of Regulations (CCR) related to providing an accessible path-of-travel.
- Addresses double jointing with AB 1860 (McKinnor) of the 2025-26 Session.
COMMENTS
Bundling multiple design-build contracts. This bill authorizes a school district, with approval of its governing board, through December 31, 2031, to procure multiple design-build contracts for comparable shade structure projects at multiple sites, through a bundled single solicitation, if the cumulative project value exceeds $1 million, but is not more than $10 million, even if individual projects within the bundle total less than $1 million.
This bill expands SB 515's exemption for shade structures. SB 515 (Stern), Chapter 489, Statutes of 2023, created a narrow exception to accessible path-of-travel requirements under the Building Code for freestanding, open-sided shade structures, included on the DSA's pre-check design list. That measure was intended to reduce project costs and facilitate the installation of shade structures on school campuses in response to increasing concerns about extreme heat exposure for students during outdoor activity.
Under the Building Code, alterations to existing school facilities that exceed a specified valuation threshold (currently $209,208) must also include the provision of an accessible path of travel to the area being altered. Smaller projects that fall below the valuation threshold are generally exempt from these requirements. However, if additional projects or repairs at the same campus within a three-year period cause the cumulative cost of alterations to exceed the threshold, the path-of-travel improvements may be required retroactively for the earlier project. According to the author, this framework may result in relatively small projects, such as playground shade structures, triggering broader accessibility upgrades if other campus work has occurred during the prior three years.
This bill proposes extending the exemption created by SB 515 to integrated shade structures attached to playground equipment, allowing these projects to remain subject to the 20% path-of-travel cap regardless of whether the valuation threshold would otherwise be exceeded.
Plan review for construction projects. The DSA reviews plans for public school construction and certain other state-funded building projects to ensure that plans, specifications, and construction comply with the Building Code. The majority of DSA's plan review and construction oversight focuses on new construction and alteration projects for California school and community college districts. DSA's plan review ensures the project's compliance with code requirements related to:
- Structural safety, ensuring that facilities meet the high standards set in the Field Act to withstand an earthquake;
- Fire and life safety, addressing the safety of occupants in buildings, as related to fire resistant building materials, fire alarms, fire suppression equipment, safe occupant egress, and firefighting equipment access;
- Access compliance, ensuring that public schools and state-funded construction projects meet accessibility requirements for people with disabilities; and
- Energy efficiency, including compliance with applicable California Green Building Standards Code requirements for sustainability.
State Architect's pre-check approval process. The DSA maintains a pre-check design list that includes over 25 "off the shelf" shade structures that schools and community colleges can install according to an expedited review and approval process. The pre-check approval process is intended to streamline DSA plan review by providing a procedure for approving the design of commonly used structures prior to the submittal of plans to DSA for construction projects. The pre-check approval process allows designers to incorporate designs for structures that have already been "pre-checked" by DSA into their plans for actual site-specific construction projects. This bill would not exempt school district projects altogether from the DSA plan review process, but only from the review of the shade structures integrated into playground equipment. Reviews would likely continue to include fire and life safety, and access compliance at a minimum. DSA notes in the document, IR A-22 Construction Projects and Items Exempt from DSA Review, "When authorizing construction of exempt projects, the school district assumes responsibility to assure compliance with all code provisions."
According to the Author
"Spending time outside plays a vital role in supporting children's overall health and academic achievement. Regular access to outdoor environments can reduce stress and inattentiveness while strengthening cognitive growth and emotional well-being. However, students in urban areas face greater exposure to extreme temperatures, which can undermine the benefits of outdoor play by increasing their vulnerability to heat-related illnesses and diminishing their ability to focus and learn. Proper shading structures are essential to lower surrounding temperatures and protect children from dangerous heat. We are proud to continue the important work of SB 515 had started by expanding its provisions to include overhead playground structure shading, further empowering our schools to quickly and cost-effectively provide schoolyard shading that keeps our children cool while they play."
Arguments in Support
The Los Angeles Unified School District writes, "Schoolyard shading mitigates the urban heat island effect and reduce ambient temperatures by at last 15 degrees, safeguarding children's physical and mental health and promoting educational progress. As school districts invest in greening projects, particularly in areas where students have the least access to parks or green space, regulatory barriers have made the installation of shade structures cost prohibitive. This measure builds off the progress from our prior collaboration, Senate Bill 515, to reduce costs and streamline the process for approving and installing schoolyard shade structures. Whereas that effort was limited to free standing, open-sided shade structures that are detached from the playground structures themselves, this version would include shade structures attached to playground equipment. In all cases, the structures will be pre-approved by the Division of the State Architect. Moreover, no general funds would be used for these projects."
Arguments in Opposition
None on file
FISCAL COMMENTS
According to the Assembly Appropriations Committee:
- Ongoing General Fund costs of $1.1 million for the Labor Commissioner's Office (under the Department of Industrial Relations (DIR)) to accommodate the additional number of projects subject to enforcement of skilled and trained workforce requirements by the Division of Labor Standards Enforcement. According to DIR, under existing law, school districts are required to use a skilled and trained workforce to perform all work for design-build projects or contracts that fall within an apprenticeable occupation in the building and construction trades.
- Minor and absorbable costs to the Division of the State Architect (DSA) within the Department of General Services (DGS).
VOTES
SENATE FLOOR: 37-0-3
YES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Padilla, Pérez, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Weber Pierson, Wiener
ABS, ABST OR NV: Ochoa Bogh, Reyes, Wahab
ASM EDUCATION: 8-0-1
YES: Patel, Hoover, Alvarez, Bonta, Castillo, Lowenthal, Pellerin, Zbur
ABS, ABST OR NV: Garcia
ASM APPROPRIATIONS: 11-0-4
YES: Wicks, Arambula, Calderon, Caloza, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache
ABS, ABST OR NV: Hoover, Dixon, Ta, Tangipa
UPDATED
VERSION: August 13, 2026
CONSULTANT: Marguerite Ries / ED. / (916) 319-2087 FN: 0003538
Date of Hearing: August 5, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 1107
Author:(Stern) – As Amended Ver:July 2, 2026
Policy Committee: | Education | Vote: | 8 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill authorizes a school district, with approval of its governing board, through December 31, 2031, to procure multiple design-build contracts for comparable shade structure projects at multiple sites, through a bundled single solicitation, if the cumulative project value exceeds $1 million, but is not more than $10 million, even if individual projects within the bundle total less than $1 million. The bill also expands an existing exemption from California Building Standards Code regarding path of travel compliance improvements to integrated playground shade structures by adding such structures to the Division of the State Architect’s (DSA) pre-checked designs list.
FISCAL EFFECT:
- Ongoing General Fund costs of $1.1 million for the Labor Commissioner’s Office (under the Department of Industrial Relations (DIR)) to accommodate the additional number of projects subject to enforcement of skilled and trained workforce requirements by the Division of Labor Standards Enforcement. According to DIR, under existing law, school districts are required to use a skilled and trained workforce to perform all work for design-build projects or contracts that fall within an apprenticeable occupation in the building and construction trades.
- Minor and absorbable costs to the Division of the State Architect (DSA) within the Department of General Services (DGS).
COMMENTS:
- Purpose. According to the author:
Spending time outside plays a vital role in supporting children’s overall health and academic achievement. Regular access to outdoor environments can reduce stress and inattentiveness while strengthening cognitive growth and emotional well-being. However, students in urban areas face greater exposure to extreme temperatures, which can undermine the benefits of outdoor play by increasing their vulnerability to heat-related illnesses and diminishing their ability to focus and learn. Proper shading structures are essential to lower surrounding temperatures and protect children from dangerous heat. We are proud to continue the important work of SB 515 had started by expanding its provisions to include overhead playground structure shading, further empowering our schools to quickly and cost-effectively provide schoolyard shading that keeps our children cool while they play.
- Background. Design Build. Under current law, public schools and community colleges may choose from multiple construction delivery methods for projects on their campuses. Under the design-build method, authorized for projects over $1 million, the school district first engages a general contractor, and the general contractor engages an architect or engineer to design the project and then subcontracts with a third party who builds the project. This method can lead to greater price certainty than the alternatives and is oftentimes an overall quicker process.
This bill authorizes a school district, through December 31, 2031, to procure multiple design-build contracts for comparable shade structure projects at multiple sites through a bundled single solicitation with a cumulative project value of more than $1 million, but not more than $10 million, even if individual projects within the bundle have a value of less than $1 million, and award them to either the lowest bid or the best value.
Shade Structures. DSA, housed under DGS, reviews plans for public school construction and certain other state-funded building projects to ensure that plans, specifications, and construction comply with the California Building Standards Code, including accessibility requirements for people with disabilities. To streamline plan review and approval for certain projects, DSA maintains a pre-check design list that includes over 25 “off the shelf” shade structures LEAs and community colleges may install according to an expedited review and approval process.
The California Building Standards Code requires construction projects over a certain valuation threshold (currently $195,358) to also provide “an accessible path of travel” from the building entrance to the project location. Shade structures and other small projects that fall below the threshold amount are exempt from these path of travel requirements. The California Building Standards Code also requires that if an area has been altered without providing an accessible path of travel to that area, and subsequent alterations of that area or a different area on the same path of travel are undertaken within three years of the original alteration, therefore causing the total expenditure to exceed the valuation threshold, the original path of travel alterations must be made retroactively. SB 515 (Stern), Chapter 489, Statutes of 2023, exempted LEAs and community colleges from having to make these retroactive alterations.
This bill extends that exemption to integrated play structures attached to playground equipment.
Analysis Prepared by: Aaron Heredia / APPR. / (916) 319-2081
Date of Hearing: July 1, 2026
ASSEMBLY COMMITTEE ON EDUCATION
Darshana R. Patel, Chair
SBPCA Bill Id:SB 1107
Author:(Stern) – As Amended Ver:June 8, 2026
SENATE VOTE: 37-0
SUBJECT: School facilities: design-build: shade structures
SUMMARY: Expands an existing exemption from accessible path-of-travel requirements under the California Building Standards Code (Building Code) for certain freestanding shade structures to also apply to shade structures that are integrated into playground equipment. Authorizes the procurement of multiple design-build contracts for comparable projects at various sites, bundled through a single solicitation if the total value of the projects exceeds $1 million. Specifically, this bill:
- Authorizes that projects solely for the installation of shade structures integrated with playground equipment included on the Division of the State Architect (DSA) approved pre-checked design list, that do not exceed the valuation threshold for alterations, structural repairs, or additions to existing buildings, on a school district, COE, charter school, or community college campus are not required to comply with Section 202.4 of Chapter 11B of Part 2 of Title 24 of the California Code of Regulations (CCR).
- Authorizes a school district, with approval of its governing board, to procure multiple design-build contracts for comparable projects at various sites, including, but not limited to, shade structure projects, bundled through a single solicitation, even if the values of any individual projects are less than $1 million, if the total value of the projects exceeds $1 million, awarding the bundled contracts to either the low bid or the best value. Requires each contract awarded through a bundled solicitation to be a separate contract for a single project with an individual contract value, scope of work, location, schedule, design, and construction.
EXISTING LAW:
- Establishes the School Facility Program (SFP) under which the state provides general obligation bond funding for various school construction projects, including new construction, modernization, joint-use facilities, and programs to specifically address the construction needs of charter schools, career technical education facilities, and seismic mitigation. (EC 17070.10-17019.30)
- Requires projects solely for the installation of freestanding, open-sided shade structures included on the DSA pre-checked designs list where the adjusted construction cost exceeds the valuation threshold for alterations or additions on a school district, county office of education, charter school, or community college campus to have the cost of compliance for path of travel improvements required by Section 202.4 of Chapter 11B of Part 2 of the Building Code limited to 20% of the adjusted construction cost of the shade structure project. (Education Code (EC) 17671)
- Defines “construction or alteration” for purposes of school facilities projects to include any construction, reconstruction, or alteration of, or addition to, any school building. (EC 17294 and 81130.5)
- Requires the Department of General Services (DGS) to pass upon and approve or reject all plans for the construction or, if the estimated cost exceeds $100,000, the alteration of any school building. (EC 17295 and 81133)
- Generally requires the governing board of each school and community college district, before adopting construction or alteration plans, to submit the plans to DGS for approval and pay all associated fees. (EC 17295 and 81133)
- Requires construction projects over $ 209,208 (cost threshold) to provide “an accessible path of travel” from the building entrance to the project location. (24 CCR 11B-202.4)
- Requires that an alteration that affects or could affect the usability or access to an area of a facility that contains a primary function to be made so as to ensure that, to the maximum extent feasible, the path of travel to the altered area and the restrooms, telephones, and drinking fountains serving the altered area are readily accessible to and usable by individuals with disabilities, including individuals who use wheelchairs, unless the cost and scope of such alterations is disproportionate to the cost of the overall alteration. Requires that alterations made to provide an accessible path of travel to the altered area will be deemed disproportionate to the overall alteration when the cost exceeds 20% of the cost of the alteration to the primary function area. (28 Code of Federal Regulations (CFR) 35.151)
- Requires, when the adjusted construction cost, as defined, is less than or equal to the current valuation threshold, as defined, the cost of compliance with Section 11B-202.4 of 24 CCR to be limited to 20% of the adjusted construction cost of alterations, structural repairs or additions. When the cost of full compliance with Section 11B-202.4 would exceed 20%, compliance shall be provided to the greatest extent possible without exceeding 20%. (24 CCR 11B-202.4)
- Prohibits the obligation to provide an accessible path of travel from being evaded by performing a series of small alterations to the area served by a single path of travel if those alterations could have been performed as a single undertaking. (28 CFR 35.151)
- Requires, if an area containing a primary function has been altered without providing an accessible path of travel to that area, and subsequent alterations of that area, or a different area on the same path of travel, are undertaken within three years of the original alteration, the total cost of alterations to the primary function areas on that path of travel during the preceding three year period shall be considered in determining whether the cost of making that path of travel accessible is disproportionate. (28 CFR 35.151)
- States that an area that has been altered without providing an accessible path of travel to that area, and subsequent alterations of that area or a different area on the same path of travel are undertaken within three years of the original alteration, the total cost of alterations for the preceding three-year period shall be considered in determining whether the cost threshold has been met. (24 CCR 11B-202.4)
- Requires the California Department of Education (CDE) to establish standards for use by school districts to ensure that the design and construction of school facilities is educationally appropriate, promotes school safety, and provides school districts with flexibility in designing instructional facilities. (EC 17251(c))
- Requires, the DGS, under the police power of the state, to supervise the design and construction of any school building or the reconstruction or alteration of or addition to any school building to ensure that plans and specifications comply with the specified rules and regulations, and to ensure that the work of construction has been performed in accordance with the approved plans and specifications, for the protection of life and property. (EC 17280)
- Establishes a process for a school district governing board to enter into a design-build contract for both the design and construction of education facility projects over $1 million. (EC 17250.20)
- Finds and declares that the design-build method of project delivery, using a best value procurement methodology, has reported benefits, including reduced project costs, expedited project completion and design features that are not achievable through the traditional design-bid-build method. (EC 17250.10)
- Specifies the elements required to be included in a design-build request for proposal (including significant factors, subfactors, methodology, rating and weighting schemes for evaluating proposals) and establishes, among others, prequalification, bonding and labor compliance program requirements. Prohibits a design-build entity from being prequalified or short-listed unless the entity provides an enforceable commitment to the school district that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or contract that falls within an apprenticeable occupation in the building and construction trades. (EC 17250.15 – 17250.40)
FISCAL EFFECT: According to the Senate Appropriations Committee, pursuant to Senate Rule 28.8, negligible state costs.
COMMENTS:
Need for the bill. According to the author, “Spending time outside plays a vital role in supporting children’s overall health and academic achievement. Regular access to outdoor environments can reduce stress and inattentiveness while strengthening cognitive growth and emotional well-being. However, students in urban areas face greater exposure to extreme temperatures, which can undermine the benefits of outdoor play by increasing their vulnerability to heat-related illnesses and diminishing their ability to focus and learn. Proper shading structures are essential to lower surrounding temperatures and protect children from dangerous heat.
We are proud to continue the important work of SB 515 had started by expanding its provisions to include overhead playground structure shading, further empowering our schools to quickly and cost-effectively provide schoolyard shading that keeps our children cool while they play.”
This bill expands SB 515’s exemption for shade structures. SB 515 (Stern), Chapter 489, Statutes of 2023, created a narrow exception to accessible path-of-travel requirements under the Building Code for freestanding, open-sided shade structures, included on the DSA’s pre-check design list. That measure was intended to reduce project costs and facilitate the installation of shade structures on school campuses in response to increasing concerns about extreme heat exposure for students during outdoor activity.
Under the Building Code, alterations to existing school facilities that exceed a specified valuation threshold (currently $209,208) must also include the provision of an accessible path of travel to the area being altered. Smaller projects that fall below the valuation threshold are generally exempt from these requirements. However, if additional projects or repairs at the same campus within a three-year period cause the cumulative cost of alterations to exceed the threshold, the path-of-travel improvements may be required retroactively for the earlier project. According to the author, this framework may result in relatively small projects, such as playground shade structures, triggering broader accessibility upgrades if other campus work has occurred during the prior three years.
This bill proposes extending the exemption created by SB 515 to integrated shade structures attached to playground equipment, allowing these projects to remain subject to the 20% path-of-travel cap regardless of whether the valuation threshold would otherwise be exceeded.
Design-build. Under a design-build process, a K-12 school district or other public or private agency issues a bid for both design and construction of a facility. A general contractor may collaborate with an architect/engineer to submit a proposal, or a general contractor may submit the proposal and subcontract with an architect/engineer. The school district must also establish a process to prequalify design-build entities using a standard questionnaire developed by the Department of Industrial Relations. In addition to K-12 schools and California Community Colleges (CCC) districts, a number of design-build authorizations have been given to various cities and counties, state building projects, and transit districts.
Rather than selecting the contractor based solely on the lowest offer, a school district may use criteria in addition to cost, which may include qualification, experience, proposed design approach, life cycle costs, project features, and project functions. Based on the criteria selected by a governing board, the proposals are scored and awarded to the bidder whose proposal is considered to be the best value to the school district. Under a design-bid-build process, the architect works independently on the design of the facility. Once construction begins, any problems identified by the contractor must be resolved, frequently with the school district acting as the mediator. Under design-build, the architect and contractor are working together from the beginning of the project, thereby reducing conflicts, delays, and additional costs during the construction phase. Design-build contracting can expedite the construction of a project, avoid conflicts between architects/engineers and contractors, and according to experiences from school and community college districts, reduce costs by reducing change orders once construction begins. Design-build for school districts is only for projects over $1 million and requires the use of a skilled and trained workforce to perform all work on the project or contract that falls within an apprenticeable occupation in the building and construction trades.
This bill would authorize a school district, with approval of its governing board, to procure multiple design-build contracts for comparable projects at various sites, including, but not limited to, shade structure projects, bundled through a single solicitation, even if the values of any individual projects are less than $1 million, if the total value of the projects exceeds $1 million, awarding the bundled contracts to either the low bid or the best value. This bill also requires each contract awarded through a bundled solicitation to be a separate contract for a single project with an individual contract value, scope of work, location, schedule, design, and construction.
Accessible path of travel required by the Building Code. The Building Code requires, when alterations or additions are made to existing buildings or facilities, an “accessible path of travel” to the specific area of alteration or addition to be provided. An accessible path of travel is required to include 1) a primary entrance to the building or facility, 2) toilet and bathing facilities serving the area, 3) drinking fountains serving the area, 4) public telephones serving the area, and 5) signs. If the project site already meets the accessible path of travel requirements, no improvements are required to be made. Similar federal requirements are in place to provide an accessible path of travel to meet the requirements of the Americans with Disabilities Act.
Federal regulation requires that there is deemed to be a disparity to the overall alternation when costs exceed 20% of the cost to the alteration to the primary function area. State Building Code requires that when construction project costs are less than or equal to the valuation threshold, the cost of the required improvements is limited to 20% of the construction cost; however, when construction costs are more than the valuation threshold, the cost of the required improvements may exceed 20%. The enforcing agency may determine that the cost of compliance with the accessible path of travel requirements is an unreasonable burden, then full compliance is not required, but the cost of compliance must be at least 20%. Therefore, in specified projects over the valuation threshold, federal requirements establish a ceiling and state requirements establish a floor for costs related to meeting accessibility of path requirements.
Federal and state requirements further require that if an area has been altered without providing an accessible path of travel to that area, and subsequent alterations of that area of a different area on the same path of travel are undertaken within three years of the original alteration, the total cost of the alterations to the areas on that path of travel during the preceding three-year period shall be considered in determining whether the cost of making that plan of travel accessible is disproportionate.
The Field Act. All school facilities must be built in compliance with specified earthquake safety standards, commonly known as the “Field Act.” The Field Act was enacted following a severe earthquake in Long Beach in 1933. The Field Act requires a comprehensive design specification and construction inspection process for K-12 public school educational facilities. Community college facilities may be constructed in accordance with either the Field Act or the California Building Standards Code.
The Field Act requires the DSA (within DGS) to review the construction plans for school buildings and requires school districts to hire onsite construction inspectors to ensure compliance with the structural safety standards. School and community college construction contracts may only be awarded after DSA approval of the plans and specifications on which the contracts are based.
Plan review for construction projects. The DSA reviews plans for public school construction and certain other state-funded building projects to ensure that plans, specifications, and construction comply with the Building Code. The majority of DSA’s plan review and construction oversight focuses on new construction and alteration projects for California school and community college districts. DSA’s plan review ensures the project’s compliance with code requirements related to:
- Structural safety, ensuring that facilities meet the high standards set in the Field Act to withstand an earthquake;
- Fire and life safety, addressing the safety of occupants in buildings, as related to fire resistant building materials, fire alarms, fire suppression equipment, safe occupant egress, and firefighting equipment access;
- Access compliance, ensuring that public schools and state-funded construction projects meet accessibility requirements for people with disabilities; and
- Energy efficiency, including compliance with applicable California Green Building Standards Code requirements for sustainability.
State Architect’s pre-check approval process. The DSA maintains a pre-check design list that includes over 25 “off the shelf” shade structures that schools and community colleges can install according to an expedited review and approval process. The pre-check approval process is intended to streamline DSA plan review by providing a procedure for approving the design of commonly used structures prior to the submittal of plans to DSA for construction projects. The pre-check approval process allows designers to incorporate designs for structures that have already been “pre-checked” by DSA into their plans for actual site-specific construction projects. This bill would not exempt school district projects altogether from the DSA plan review process, but only from the review of the shade structures integrated into playground equipment. Reviews would likely continue to include fire and life safety, and access compliance at a minimum. DSA notes in the document, IR A-22 Construction Projects and Items Exempt from DSA Review, “When authorizing construction of exempt projects, the school district assumes responsibility to assure compliance with all code provisions.”
Climate change. California’s climate is generally expected to become hotter, drier, and more variable over the coming decades, increasing the risk of catastrophic wildfires, droughts, floods, extreme weather, biodiversity loss, and sea level rise. California’s Fourth Climate Assessment estimates the economic cost to California for these losses by 2050 will be over $100 billion annually. Average global temperatures have increased since 1895, with the fastest relative increase beginning in the 1980s. Nine of the ten hottest years recorded have occurred in the last decade. In California, the statewide average temperature is predicted to increase 1.9°F by 2025 and 4.6°F by 2050. Populations in cooler parts of the state, particularly along the coast, are generally at a greater risk for health-related illness because they are less acclimatized to heat, people may be less aware of behaviors to reduce exposure, and the built environment is not designed for warmer temperatures.
Urban areas have higher temperatures than in surrounding areas due to pavement and building materials that absorb sunlight and heat. This phenomenon is referred to as the urban heat island effect. Average daytime temperatures in urban areas are 1-6°F warmer than surrounding areas, but at night that increases to as much as 22°F as the heat is gradually released from buildings and paved surfaces. The urban heat island effect increases the health risks associated with extreme heat for populations living in those areas. A number of strategies can be used to mitigate the urban heat island effect, such as shading, green spaces, and the use of cool building and paving materials.
Local educational agencies (LEAs) have diverse and unique energy and climate challenges. Public K-12 facilities in California include approximately 12,800 schools with more than 714 million square feet of space, making LEAs the largest category of building in the public building sector. Unlike other commercial end users, government buildings generally are not able to use energy savings to reinvest in more capital improvements, which leads public buildings to require regular cycles of investment to update facilities and replace less efficient appliances. While some school districts may seek local and state bond or tax funding to make these updates, other school districts may seek monies and tax incentives from the recently enacted Infrastructure Investment and Jobs Act (IIJA) and Inflation Reduction Act (IRA).
Shade in schoolyards. According to a 2023 University of California, Los Angeles (UCLA) Luskin Center for Innovation policy brief, Protecting California with Heat-Resilient Schools, “despite some progress, the nexus of schools and extreme heat is an understudied and underfunded area deserving of more targeted attention. The amount of shade needed to provide a safe environment is not established, but research is underway to develop guidance for playground design and thermal comfort.” Figure 1 illustrates an example of the heat burden from high surface temperatures in schoolyards with and without shade.
Figure 1: Example of heat burden from high surface temperatures in school yards
Source: Protecting California with Heat-Resilient Schools, UCLA Luskin Center for Innovation, 2023.
The impact of heat on student health and academic performance. As climate change intensifies, students are increasingly burdened by worsening heat waves, wildfires, drought, and other extreme weather-related events that hinder their well-being and academic development, according to a 2023 report from the Sean N. Parker Center for Allergy and Asthma Research at Stanford University and other partners, Climate Resilient California Schools: Safeguarding Children’s Health and Opportunity to Learn in TK-12. Children are particularly vulnerable to extreme weather conditions because their bodies are more sensitive and less capable of self-regulating temperature. According to a 2023 UCLA Luskin Center for Innovation policy brief, “Children also face a heightened risk of some health conditions, including asthma, when they experience extremely high temperatures. Overheating at schools can lead to hospital emergency department room visits and missed school days. Socially, children have less agency to take care of their needs by retreating to a cool area. And when considering the effects of hot protective sports equipment, heat-absorbing blacktops, and other intensifying factors, children often face particularly heightened heat exposures, and thus risk, at school.”
According to a 2022 Legislative Analyst’s Office report, Climate Change Impacts Across California K-12 Education, climate change has led to students experiencing greater learning loss, poorer academic outcomes, food insecurity, and traumatic mental health problems. Moreover, minority children who live in high-poverty neighborhoods are often exposed to more heat, which contributes to racial disparities in health outcomes. School facilities located in low-income neighborhoods have historically had fewer financial resources to invest in efficient HVAC systems, and may have play areas covered in asphalt without shade, thereby compounding student health risks from worsening climate change.
According to a 2020 Journal of Human Resources article, Hot Temperature and High Stakes Performance, hot temperature reduces performance by up to 13% of a standard deviation and leads to persistent impacts on high school graduation status, despite compensatory responses by teachers who selectively upward manipulate grades after hotter exams. According to a 2020 American Economic Journal: Economic Policy article, Heat and Learning, students of color and students in lower-income areas are the most affected by heat-driven learning losses, exacerbating racial and income-based achievement gaps. It is estimated that 5% of the nationwide gap in academic achievement between white and Black students is due to heat and air conditioning disparities.
California’s Extreme Heat Action Plan. Existing law requires the Natural Resources Agency to update the state’s climate adaptation strategy every three years. In updating the strategy, the need for an interagency approach to extreme heat was identified, and therefore, the state updated its extreme heat guidance and recommendations to create California’s Extreme Heat Action Plan.
California’s Extreme Heat Action Plan was released by the Natural Resources Agency (NRA) in April 2022. The plan provides a strategic and comprehensive set of state actions to adapt and build resilience to extreme heat, including exploring the implementation of indoor and outdoor heat exposure rules for schools, supporting climate-smart planning in heat-vulnerable schools, promoting climate-appropriate shade tree cover and schools, and promoting increased use of green barriers between agricultural fields and schools.
Arguments in support. The Los Angeles Unified School District writes, “Schoolyard shading mitigates the urban heat island effect and reduce ambient temperatures by at last 15 degrees, safeguarding children’s physical and mental health and promoting educational progress. As school districts invest in greening projects, particularly in areas where students have the least access to parks or green space, regulatory barriers have made the installation of shade structures cost prohibitive.
This measure builds off the progress from our prior collaboration, Senate Bill 515, to reduce costs and streamline the process for approving and installing schoolyard shade structures. Whereas that effort was limited to free standing, open-sided shade structures that are detached from the playground structures themselves, this version would include shade structures attached to playground equipment. In all cases, the structures will be pre-approved by the Division of the State Architect. Moreover, no general funds would be used for these projects.”
Recommended Committee Amendments. Staff recommends that the bill be amended as follows:
- Limit the authorization to procure multiple design-build projects to only comparable shade structure projects bundled through a single solicitation, rather than any design-build project;
- Limit the use of procuring multiple design-build projects under this authorization to solicitations bundling comparable shade structure projects to less than $10 million in total; and
- Limit the authorization to only those contacts procured and secured before December 31, 2031.
Related legislation. SB 515 (Stern), Chapter 489, Statutes of 2023, establishes the existing 20% cap on accessibility-related path of travel improvements costs for freestanding, open-sided shade structures on school campuses.
AB 247 (Muratsuchi), Chapter 81, Statutes of 2023, placed the Kindergarten-Community Colleges Public Education Facilities Bond Act of 2024 on the 2024 statewide ballot as Proposition 2. Proposition 2 (2024) passed with 58.7% of voters supporting the measure.
AB 1642 (Gipson) of the 2023-24 Session would have required the CDE and the NRA, in consultation with the DSA, the OPSC, and any other appropriate state entities, to facilitate an interagency and stakeholder engagement process to develop, on or before December 1, 2024, recommendations for a master plan for green schoolyards. This bill was held in the Senate Appropriations Committee.
SB 394 (Gonzalez) of the 2023-24 Session would have required, upon an appropriation by the Legislature for this purpose, the California Energy Commission (CEC), in consultation with the CDE, DSA, OPSC, and NRA, to facilitate an interagency process and stakeholder engagement to develop a Master Plan for Healthy, Sustainable, and Climate-Resilient Schools. This bill was vetoed with the following message:
While I support the author's goal of making our schools more climate friendly and climate prepared, the development of this Master Plan will cost up to $10 million that was not considered through the annual budget process. Additionally, the Master Plan would create significant long-term cost pressures that are not accounted for in the state budget plan.
SB 499 (Menjivar) of the 2023-24 Session would have required every school in the state, contingent on appropriation, to develop and implement an extreme heat action plan. The bill would have also required every school to replace outdoor surfaces with more heat resistant materials the next time the school replaces an outdoor surface. This bill was held in the Assembly Appropriations Committee.
AB 544 (O’Donnell) of the 2021-22 Session would have required LEAs to provide the CDE information related to each school facility, schoolsite, or school property owned or leased by the LEA. This bill was held in the Senate Education Committee.
REGISTERED SUPPORT / OPPOSITION:
Support
California School Boards Association
California State PTA
Center for Ecoliteracy
Elders Climate Action Northern CA Chapter
Elders Climate Action Southern CA Chapter
Los Angeles Unified School District
Natural Resources Defense Council
Sacramento Splash
Ten Strands
UndauntedK12
Opposition
None on file
Analysis Prepared by: Marguerite Ries / ED. / (916) 319-2087
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 1107 |
THIRD READING
Bill No: SB 1107
Author: Stern (D)
Amended: 3/23/26
Vote: 21
SENATE EDUCATION COMMITTEE: 7-0, 4/8/26
AYES: Pérez, Ochoa Bogh, Cabaldon, Choi, Cortese, Gonzalez, Reyes
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SUBJECT: School facilities: shade structures
SOURCE: Los Angeles Unified School District
DIGEST:
This bill expands an existing exemption from accessible path-of-travel requirements under the California Building Standards Code (Building Code) for certain freestanding shade structures to also apply to shade structures that are integrated into playground equipment.
ANALYSIS:
Existing law:
1) Defines “construction or alteration” for purposes of school facilities projects to include any construction, reconstruction, or alteration of, or addition to, any school building.
2) Requires the Department of General Services (DGS) to pass upon and approve or reject all plans for the construction or, if the estimated cost exceeds $100,000, the alteration of any school building.
3) Generally requires the governing board of each school and community college district, before adopting construction or alteration plans, to submit the plans to DGS for approval and pay all associated fees.
4) Requires construction projects over $209,208 (cost threshold) to provide “an accessible path of travel” from the building entrance to the project location.
5) Specifies that an area that has been altered without providing an accessible path of travel to that area, and subsequent alterations of that area or a different area on the same path of travel are undertaken within three years of the original alteration, the total cost of alterations for the preceding three-year period shall be considered in determining whether the cost threshold has been met.
6) Limits the cost of complying with the requirement to provide an accessible path of travel to a free-standing, open-sided shade structure project to 20% of the adjusted construction cost, as defined, of the shade structure project.
This bill expands an existing exemption from accessible path-of-travel requirements under the Building Code for certain freestanding shade structures to also apply to integrated shade structures attached to playground equipment that are included on the Division of the State Architect’s (DSA’s) approved pre-check design list.
Comments
1) Need for the bill. According to the author, “Spending time outside plays a vital role in supporting children’s overall health and academic achievement. Regular access to outdoor environments can reduce stress and inattentiveness while strengthening cognitive growth and emotional well-being. However, students in urban areas face greater exposure to extreme temperatures, which can undermine the benefits of outdoor play by increasing their vulnerability to heat-related illnesses and diminishing their ability to focus and learn. Proper shading structures are essential to lower surrounding temperatures and protect children from dangerous heat.
“We are proud to continue the important work SB 515 had started by expanding its provisions to include overheard playground structure shading, further empowering our schools to quickly and cost-effectively provide schoolyard shading that keeps our children cool while they play.”
2) Plan review for construction projects. The DSA reviews plans for public school construction and certain other state-funded building projects to ensure that plans, specifications, and construction comply with California’s building codes (Title 24 of the California Code of Regulations). The majority of DSA’s plan review and construction oversight focuses on new construction and alteration projects for California school and community college districts. DSA’s plan review ensures the project’s compliance with code requirements related to:
a) Structural safety, ensuring that facilities meet the high standards set in the Field Act to withstand an earthquake.
b) Fire and life safety, addressing the safety of occupants in buildings, as related to fire resistive building materials, fire alarms, fire suppression equipment, safe occupant egress, and firefighting equipment access.
c) Access compliance, ensuring that public schools and state-funded construction projects meet accessibility requirements for people with disabilities.
d) Energy efficiency, including compliance with applicable California Green Building Standards Code requirements for sustainability.
3) The Field Act. All school facilities must be built in compliance with specified earthquake safety standards, commonly known as the “Field Act.” The Field Act was enacted following a severe earthquake in Long Beach in 1933. The Field Act requires a comprehensive design specification and construction inspection process for K-12 public school educational facilities. Community college facilities may be constructed in accordance with either the Field Act or the Building Code.
The Field Act requires the DSA (within DGS) to review the construction plans for school buildings and requires school districts to hire onsite construction inspectors to ensure compliance with the structural safety standards. School and community college construction contracts may only be awarded after DSA approval of the plans and specifications on which the contracts are based.
4) State Architect’s pre-check approval process. The DSA maintains a pre-check design list that includes over 25 “off the shelf” shade structures that schools and community colleges can install according to an expedited review and approval process. The pre-check approval process is intended to streamline DSA plan review by providing a procedure for approving the design of commonly used structures prior to the submittal of plans to DSA for construction projects. The pre-check approval process allows designers to incorporate designs for structures that have already been “pre-checked” by DSA into their plans for actual site-specific construction projects.
5) Expanding SB 515’s exemption for shade structures. SB 515 (Stern, Chapter 489, Statutes of 2023) created a narrow exception to accessible path-of-travel requirements under the Building Code for freestanding, open-sided shade structures included DSA’s pre-check design list. That measure was intended to reduce project costs and facilitate the installation of shade structures on school campuses in response to increasing concerns about extreme heat exposure for students during outdoor activity.
Under the Building Code, alterations to existing school facilities that exceed a specified valuation threshold (currently $209,208) must also include the provision of an accessible path of travel to the area being altered. Smaller projects that fall below the valuation threshold are generally exempt from these requirements. However, if additional projects or repairs at the same campus within a three-year period cause the cumulative cost of alterations to exceed the threshold, the path-of-travel improvements may be required retroactively for the earlier project. According to the author, this framework may result in relatively small projects, such as playground shade structures, triggering broader accessibility upgrades if other campus work has occurred during the prior three years.
This bill proposes to extend the exemption created by SB 515 to integrated shade structures attached to playground equipment, allowing these projects to remain subject to the 20% path-of-travel cap regardless of whether the valuation threshold would otherwise be exceeded.
6) Balancing climate adaptation with accessibility improvements. School districts and advocates increasingly view playground shade structures as an important strategy for protecting students from extreme heat during outdoor activity. For example, Los Angeles Unified School District (LAUSD) reports that approximately 380 schools lack shade over play structures. With a $40 million budget dedicated to shade shelters, LAUSD estimates it can install structures at approximately 49 schools, prioritizing campuses using its Student Equity Need Index to target investments toward communities most vulnerable to extreme heat. According to LAUSD, reducing project costs associated with accessibility triggers allows available funding to reach a greater number of campuses.
At the same time, accessible path-of-travel requirements serve an important policy purpose: ensuring that accessibility improvements are incorporated into existing school facilities over time as campuses undergo alterations. For students, staff, and visitors who use wheelchairs or have other mobility challenges, these incremental upgrades can determine whether new or improved spaces on campus are reachable. Expanding exemptions from these requirements may allow new amenities to be installed without triggering broader accessibility improvements that might otherwise occur during facility upgrades. As the Committee considers expanding the exemption created by SB 515, it may wish to weigh the benefits of facilitating additional shade installations against the potential for fewer accessibility improvements to be made on aging school campuses.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
SUPPORT: (Verified 4/16/26)
Los Angeles Unified School District (source)
OPPOSITION: (Verified 4/16/26)
Prepared by: Ian Johnson / ED. / (916) 651-4105
4/21/26 16:19:39
**** END ****
SENATE COMMITTEE ON EDUCATION
Senator Sasha Renée Pérez, Chair
2025 - 2026 Regular
Bill No: Hearing Date: April 8, 2026
Author: | |||
Version: |
| ||
Urgency: | Fiscal: | ||
Consultant: | |||
Subject: .
SUMMARY
This bill expands an existing exemption from accessible path-of-travel requirements under the California Building Standards Code (Building Code) for certain freestanding shade structures to also apply to shade structures that are integrated into playground equipment.
BACKGROUND
Existing law:
- Defines “construction or alteration” for purposes of school facilities projects to include any construction, reconstruction, or alteration of, or addition to, any school building.
- Requires the Department of General Services (DGS) to pass upon and approve or reject all plans for the construction or, if the estimated cost exceeds $100,000, the alteration of any school building.
- Generally requires the governing board of each school and community college district, before adopting construction or alteration plans, to submit the plans to DGS for approval and pay all associated fees.
- Requires construction projects over $209,208 (cost threshold) to provide “an accessible path of travel” from the building entrance to the project location.
- Specifies that an area that has been altered without providing an accessible path of travel to that area, and subsequent alterations of that area or a different area on the same path of travel are undertaken within three years of the original alteration, the total cost of alterations for the preceding three-year period shall be considered in determining whether the cost threshold has been met.
- Limits the cost of complying with the requirement to provide an accessible path of travel to a free-standing, open-sided shade structure project to 20% of the adjusted construction cost, as defined, of the shade structure project.
ANALYSIS
This bill expands an existing exemption from accessible path-of-travel requirements under the Building Code for certain freestanding shade structures to also apply to integrated shade structures attached to playground equipment that are included on the Division of the State Architect’s (DSA’s) approved pre-check design list.
STAFF COMMENTS
- Need for the bill. According to the author, “Spending time outside plays a vital role in supporting children’s overall health and academic achievement. Regular access to outdoor environments can reduce stress and inattentiveness while strengthening cognitive growth and emotional well-being. However, students in urban areas face greater exposure to extreme temperatures, which can undermine the benefits of outdoor play by increasing their vulnerability to heat-related illnesses and diminishing their ability to focus and learn. Proper shading structures are essential to lower surrounding temperatures and protect children from dangerous heat.
“We are proud to continue the important work SB 515 had started by expanding its provisions to include overheard playground structure shading, further empowering our schools to quickly and cost-effectively provide schoolyard shading that keeps our children cool while they play.”
- Plan review for construction projects. The DSA reviews plans for public school construction and certain other state-funded building projects to ensure that plans, specifications, and construction comply with California’s building codes (Title 24 of the California Code of Regulations). The majority of DSA’s plan review and construction oversight focuses on new construction and alteration projects for California school and community college districts. DSA’s plan review ensures the project’s compliance with code requirements related to:
- Structural safety, ensuring that facilities meet the high standards set in the Field Act to withstand an earthquake.
- Fire and life safety, addressing the safety of occupants in buildings, as related to fire resistive building materials, fire alarms, fire suppression equipment, safe occupant egress, and firefighting equipment access.
- Access compliance, ensuring that public schools and state-funded construction projects meet accessibility requirements for people with disabilities.
- Energy efficiency, including compliance with applicable California Green Building Standards Code requirements for sustainability.
- The Field Act. All school facilities must be built in compliance with specified earthquake safety standards, commonly known as the “Field Act.” The Field Act was enacted following a severe earthquake in Long Beach in 1933. The Field Act requires a comprehensive design specification and construction inspection process for K-12 public school educational facilities. Community college facilities may be constructed in accordance with either the Field Act or the Building Code.
The Field Act requires the DSA (within DGS) to review the construction plans for school buildings and requires school districts to hire onsite construction inspectors to ensure compliance with the structural safety standards. School and community college construction contracts may only be awarded after DSA approval of the plans and specifications on which the contracts are based.
- State Architect’s pre-check approval process. The DSA maintains a pre-check design list that includes over 25 “off the shelf” shade structures that schools and community colleges can install according to an expedited review and approval process. The pre-check approval process is intended to streamline DSA plan review by providing a procedure for approving the design of commonly used structures prior to the submittal of plans to DSA for construction projects. The pre-check approval process allows designers to incorporate designs for structures that have already been “pre-checked” by DSA into their plans for actual site-specific construction projects.
- Expanding SB 515’s exemption for shade structures. SB 515 (Stern, Chapter 489, Statutes of 2023) created a narrow exception to accessible path-of-travel requirements under the Building Code for freestanding, open-sided shade structures included DSA’s pre-check design list. That measure was intended to reduce project costs and facilitate the installation of shade structures on school campuses in response to increasing concerns about extreme heat exposure for students during outdoor activity.
Under the Building Code, alterations to existing school facilities that exceed a specified valuation threshold (currently $209,208) must also include the provision of an accessible path of travel to the area being altered. Smaller projects that fall below the valuation threshold are generally exempt from these requirements. However, if additional projects or repairs at the same campus within a three-year period cause the cumulative cost of alterations to exceed the threshold, the path-of-travel improvements may be required retroactively for the earlier project. According to the author, this framework may result in relatively small projects, such as playground shade structures, triggering broader accessibility upgrades if other campus work has occurred during the prior three years.
This bill proposes to extend the exemption created by SB 515 to integrated shade structures attached to playground equipment, allowing these projects to remain subject to the 20% path-of-travel cap regardless of whether the valuation threshold would otherwise be exceeded.
- Balancing climate adaptation with accessibility improvements. School districts and advocates increasingly view playground shade structures as an important strategy for protecting students from extreme heat during outdoor activity. For example, Los Angeles Unified School District (LAUSD) reports that approximately 380 schools lack shade over play structures. With a $40 million budget dedicated to shade shelters, LAUSD estimates it can install structures at approximately 49 schools, prioritizing campuses using its Student Equity Need Index to target investments toward communities most vulnerable to extreme heat. According to LAUSD, reducing project costs associated with accessibility triggers allows available funding to reach a greater number of campuses.
At the same time, accessible path-of-travel requirements serve an important policy purpose: ensuring that accessibility improvements are incorporated into existing school facilities over time as campuses undergo alterations. For students, staff, and visitors who use wheelchairs or have other mobility challenges, these incremental upgrades can determine whether new or improved spaces on campus are reachable. Expanding exemptions from these requirements may allow new amenities to be installed without triggering broader accessibility improvements that might otherwise occur during facility upgrades. As the Committee considers expanding the exemption created by SB 515, it may wish to weigh the benefits of facilitating additional shade installations against the potential for fewer accessibility improvements to be made on aging school campuses.
SUPPORT
Los Angeles Unified School District (sponsor)
OPPOSITION
None received
-- END --
Discussed in Hearing
Senate Floor
Assembly Floor
Assembly Standing Committee on Education
Bill Author
Bill Co-Author(s):