Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission) and the Public Utilities Commission (PUC), on or before December 15, 2022, and quarterly thereafter, to submit to the Legislature a joint Reliability Planning Assessment that, among other things, includes prospective information on existing and expected resources, including updates on the interconnection status for renewable projects and any delays in interconnection, and expected retirements for both system and local resources. Existing law requires the Energy Commission to report in the energy almanac on California energy resources that serve load in California.
This bill would require that the assessment also include the status of utility transmission upgrades and electrical grid infrastructure capacity and PUC approvals of applications for certificates of public convenience and necessity and permits to construct utility and independent projects, as specified.
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission) and the Public Utilities Commission (PUC), on or before December 15, 2022, and quarterly thereafter, to submit to the Legislature a joint Reliability Planning Assessment that, among other things, includes prospective information on existing and expected resources, including updates on the interconnection status for renewable projects and any delays in interconnection, and expected retirements for both system and local resources. Existing law requires the Energy Commission to report in the energy almanac on California energy resources that serve load in California.
This bill would require that the assessment also include the status of utility transmission upgrades and electrical grid infrastructure capacity and PUC approvals of applications for certificates of public convenience and necessity and permits to construct utility and independent projects, as specified.
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission) and the Public Utilities Commission (PUC), on or before December 15, 2022, and quarterly thereafter, to submit to the Legislature a joint Reliability Planning Assessment that, among other things, includes prospective information on existing and expected resources, including updates on the interconnection status for renewable projects and any delays in interconnection, and expected retirements for both system and local resources. Existing law requires the Energy Commission to report in the energy almanac on California energy resources that serve load in California.
This bill would require that the assessment also include the status of utility transmission upgrades and electrical grid infrastructure capacity, capacity and PUC approvals of applications for certificates of public convenience and necessity and permits to construct utility and independent projects, and applications for permits for projects from the Energy Commission and the queue of projects from the Independent System Operator, include the expected completion dates for both system and local resources, and report on the use of fossil fuel by certain facilities constructed by, purchased by, or under contract with, the Department of Water Resources, as specified.
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission) and the Public Utilities Commission (PUC), on or before December 15, 2022, and quarterly thereafter, to submit to the Legislature a joint Reliability Planning Assessment that, among other things, includes prospective information on existing and expected resources, including updates on the interconnection status for renewable projects and any delays in interconnection, and expected retirements for both system and local resources. Existing law requires the Energy Commission to report in the energy almanac on California energy resources that serve load in California.
This bill would require that the assessment also include the status of utility transmission upgrades and electrical grid infrastructure capacity, PUC approvals of applications for certificates of public convenience and necessity and permits to construct utility and independent projects, and applications for permits for projects from the Energy Commission and the queue of projects from the Independent System Operator, include the expected completion dates for both system and local resources, and report on the use of fossil fuel by certain facilities constructed by, purchased by, or under contract with, the Department of Water Resources, as specified.
(a)Notwithstanding Section 10231.5 of the Government Code, on or before December 15, 2022, and quarterly thereafter, the commission and the Public Utilities Commission shall submit a joint Reliability Planning Assessment to the Legislature in accordance with Section 9795 of the Government Code.
(1)The assessment shall identify estimates for the electrical supply and demand balance, for the forward 5- and 10-year periods, under high-, medium-, and low-risk scenarios. The assessment shall identify loads and resources online and loads and resources expected by reliability year ending September 30.
(2)The assessment shall focus on the Independent System Operator system, with an emphasis on the electrical demand, load, supply, or resources for load-serving entities subject to the Public Utilities Commissions jurisdiction. The assessment shall break down loads and resources by type of load-serving entity by year by transmission access charge area.
(3)The assessment shall include information about imports, by amount, source if known, and other relevant factors, and transmission capacity for imports by date and transmission access area or balancing authority.
(4)The commission shall provide an estimate for the loads and resources for the entities that are not subject to the Public Utilities Commissions jurisdiction that are part of the Independent System Operator system supply and demand balance.
(5)The assessment shall include prospective information on existing and expected resources, including updates on the interconnection status for renewable projects and any delays in interconnection, the status of utility transmission upgrades and electrical grid infrastructure capacity, the status of Public Utilities Commission approvals of applications for certificates of public convenience and necessity and permits to construct utility and independent projects, and expected retirements for both system and local resources. This shall include updates based on actions taken directly by, or as a result of, the Tracking Energy Development Task Force. The assessment shall include an accompanying Gantt chart to track progress.
(6)The assessment shall maintain confidentiality of market sensitive information.
(7)The assessment shall rely upon the most recently available integrated energy policy report prepared pursuant to Section 25302 for the demand assessment.
(8)The assessment shall report on any other significant delays or barriers affecting timely deployment of renewable energy and zero-carbon resources, including, but not limited to, supply chain disruptions, land use restrictions, and permitting processes.
(9)The assessment shall make recommendations to the Legislature on actions needed to resolve any delays or barriers reported in the assessment.
(10)The assessment shall report on any regulatory barriers and challenges to increasing deployment of other preferred resources, including energy efficiency and demand response programs.
(b)The commission shall continue to report on California energy resources that serve load in California in the energy almanac. The commission shall expand the energy almanac report to include storage resources that serve wholesale load. The commission shall report on energy resources that serve load in the Independent System Operator system, which is a subset of its current reporting of all California resources, and may include energy resources located outside the state.
(a)Notwithstanding Section 10231.5 of the Government Code, on or before December 15, 2022, and quarterly thereafter, the commission and the Public Utilities Commission shall submit a joint Reliability Planning Assessment to the Legislature in accordance with Section 9795 of the Government Code.
(1)The assessment shall identify estimates for the electrical supply and demand balance, for the forward 5- and 10-year periods, under high-, medium-, and low-risk scenarios. The assessment shall identify loads and resources online and loads and resources expected by reliability year ending September 30.
(2)The assessment shall focus on the Independent System Operator system, with an emphasis on the electrical demand, load, supply, or resources for load-serving entities subject to the Public Utilities Commissions jurisdiction. The assessment shall break down loads and resources by type of load-serving entity by year by transmission access charge area.
(3)The assessment shall include information about imports, by amount, source if known, and other relevant factors, and transmission capacity for imports by date and transmission access area or balancing authority.
(4)The commission shall provide an estimate for the loads and resources for the entities that are not subject to the Public Utilities Commissions jurisdiction that are part of the Independent System Operator system supply and demand balance.
(5)The assessment shall include prospective information on existing and expected resources, including updates on the interconnection status for renewable projects and any delays in interconnection, the status of utility transmission upgrades and electrical grid infrastructure capacity, the status of Public Utilities Commission approvals of applications for certificates of public convenience and necessity and permits to construct utility and independent projects, and expected retirements for both system and local resources. This shall include updates based on actions taken directly by, or as a result of, the Tracking Energy Development Task Force. The assessment shall include an accompanying Gantt chart to track progress.
(6)The assessment shall maintain confidentiality of market sensitive information.
(7)The assessment shall rely upon the most recently available integrated energy policy report prepared pursuant to Section 25302 for the demand assessment.
(8)The assessment shall report on any other significant delays or barriers affecting timely deployment of renewable energy and zero-carbon resources, including, but not limited to, supply chain disruptions, land use restrictions, and permitting processes.
(9)The assessment shall make recommendations to the Legislature on actions needed to resolve any delays or barriers reported in the assessment.
(10)The assessment shall report on any regulatory barriers and challenges to increasing deployment of other preferred resources, including energy efficiency and demand response programs.
(b)The commission shall continue to report on California energy resources that serve load in California in the energy almanac. The commission shall expand the energy almanac report to include storage resources that serve wholesale load. The commission shall report on energy resources that serve load in the Independent System Operator system, which is a subset of its current reporting of all California resources, and may include energy resources located outside the state.
(a)Notwithstanding Section 10231.5 of the Government Code, on or before December 15, 2022, and quarterly thereafter, the commission and the Public Utilities Commission shall submit a joint Reliability Planning Assessment to the Legislature in accordance with Section 9795 of the Government Code.
(1)The assessment shall identify estimates for the electrical supply and demand balance, for the forward 5- and 10-year periods, under high-, medium-, and low-risk scenarios. The assessment shall identify loads and resources online and loads and resources expected by reliability year ending September 30.
(2)The assessment shall focus on the Independent System Operator system, with an emphasis on the electrical demand, load, supply, or resources for load-serving entities subject to the Public Utilities Commissions jurisdiction. The assessment shall break down loads and resources by type of load-serving entity by year by transmission access charge area.
(3)The assessment shall include information about imports, by amount, source if known, and other relevant factors, and transmission capacity for imports by date and transmission access area or balancing authority.
(4)The commission shall provide an estimate for the loads and resources for the entities that are not subject to the Public Utilities Commissions jurisdiction that are part of the Independent System Operator system supply and demand balance.
(5)The assessment shall include prospective information on existing and expected resources, including updates on the interconnection status for renewable projects and any delays in interconnection, the status of utility transmission upgrades and electrical grid infrastructure capacity, including substations and expanded transmission in existing corridors, the status of Public Utilities Commission approvals of applications for certificates of public convenience and necessity and permits to construct utility and independent projects, the status of applications for permits for projects from the commission and the queue of projects from the Independent System Operator, filtered by geographic region and energy resource type, and expected completion dates and retirements for both system and local resources. This shall include updates based on actions taken directly by, or as a result of, the Tracking Energy Development Task Force. The assessment shall include an accompanying Gantt chart to track progress.
(6)The assessment shall maintain confidentiality of market sensitive information.
(7)The assessment shall rely upon the most recently available integrated energy policy report prepared pursuant to Section 25302 for the demand assessment.
(8)The assessment shall report on any other significant delays or barriers affecting timely deployment of renewable energy and zero-carbon resources, including, but not limited to, supply chain disruptions, land use restrictions, and permitting processes.
(9)The assessment shall make recommendations to the Legislature on actions needed to resolve any delays or barriers reported in the assessment.
(10)The assessment shall report on any regulatory barriers and challenges to increasing deployment of other preferred resources, including energy efficiency and demand response programs.
(11)The assessment shall report on the use of fossil fuel by a facility constructed by, purchased by, or under contract with the Department of Water Resources pursuant to subdivision (a) of, or paragraph (1) of subdivision (b) of, Section 80710 of the Water Code.(b)The commission shall continue to report on California energy resources that serve load in California in the energy almanac. The commission shall expand the energy almanac report to include storage resources that serve wholesale load. The commission shall report on energy resources that serve load in the Independent System Operator system, which is a subset of its current reporting of all California resources, and may include energy resources located outside the state.
(a)Notwithstanding Section 10231.5 of the Government Code, on or before December 15, 2022, and quarterly thereafter, the commission and the Public Utilities Commission shall submit a joint Reliability Planning Assessment to the Legislature in accordance with Section 9795 of the Government Code.
(1)The assessment shall identify estimates for the electrical supply and demand balance, for the forward 5- and 10-year periods, under high-, medium-, and low-risk scenarios. The assessment shall identify loads and resources online and loads and resources expected by reliability year ending September 30.
(2)The assessment shall focus on the Independent System Operator system, with an emphasis on the electrical demand, load, supply, or resource resources for load-serving entities subject to the Public Utilities Commissions jurisdiction. The assessment shall break down loads and resources by type of load-serving entity by year by transmission access charge area.
(3)The assessment shall include information about imports, by amount, source if known, and other relevant factors, and transmission capacity for imports by date and transmission access area or balancing authority.
(4)The commission shall provide an estimate for the loads and resources for the entities that are not subject to the Public Utilities Commissions jurisdiction that are part of the Independent System Operator system supply and demand balance.
(5)The assessment shall include prospective information on existing and expected resources, including updates on the interconnection status for renewable projects and any delays in interconnection, the status of utility transmission upgrades and electrical grid infrastructure capacity, including substations and expanded transmission in existing corridors, the status of Public Utilities Commission approvals of applications for certificates of public convenience and necessity and permits to construct utility and independent projects, the status of applications for permits for projects from the commission and the queue of projects from the Independent System Operator, filtered by geographic region and energy resource type, and expected completion dates and retirements for both system and local resources. This shall include updates based on actions taken directly by, or as a result of, the Tracking Energy Development Task Force. The assessment shall include an accompanying Gantt chart to track progress.
(6)The assessment shall maintain confidentiality of market sensitive information.
(7)The assessment shall rely upon the most recently available integrated energy policy report prepared pursuant to Section 25302 for the demand assessment.
(8)The assessment shall report on any other significant delays or barriers affecting timely deployment of renewable energy and zero-carbon resources, including, but not limited to, supply chain disruptions, land use restrictions, and permitting processes.
(9)The assessment shall make recommendations to the Legislature on actions needed to resolve any delays or barriers reported in the assessment.
(10)The assessment shall report on any regulatory barriers and challenges to increasing deployment of other preferred resources, including energy efficiency and demand response programs.
(11)The assessment shall report on the use of fossil fuel by a facility constructed by, purchased by, or under contract with the Department of Water Resources pursuant to subdivision (a) of, or paragraph (1) of subdivision (b) of, Section 80710 of the Water Code.
(b)The commission shall continue to report on California energy resources that serve load in California in the energy almanac. The commission shall expand the energy almanac report to include storage resources that serve wholesale load. The commission shall report on energy resources that serve load in the Independent Systems System Operator system, which is a subset of its current reporting of all California resources, and may include energy resources located outside the state.
|
Date
|
Status
|
|---|---|
| Sep 30, 2026 | Chaptered by Secretary of State. Chapter 1012, Statutes of 2026. |
| Sep 30, 2026 | Approved by the Governor. |
| Sep 8, 2026 | Enrolled and presented to the Governor at 4 p.m. |
| Aug 30, 2026 | In Senate. Ordered to engrossing and enrolling. |
| Aug 30, 2026 | Read third time. Passed. (Ayes 70. Noes 5. Page 6856.) Ordered to the Senate. |
| Aug 30, 2026 | Read third time. Passed. Ordered to the Senate. |
| Aug 13, 2026 | Read second time. Ordered to third reading. |
| Aug 13, 2026 | From committee: Do pass. (Ayes 14. Noes 1.) (August 13). |
| Aug 13, 2026 | Assembly Rule 63 suspended. |
| Aug 5, 2026 | August 5 set for first hearing. Placed on suspense file. |
| Jun 25, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 17. Noes 0.) (June 24). Re-referred to Com. on APPR. |
| Jun 1, 2026 | Referred to Com. on U. & E. |
| May 26, 2026 | In Assembly. Read first time. Held at Desk. |
| May 26, 2026 | Read third time. Passed. (Ayes 37. Noes 0. Page 4449.) Ordered to the Assembly. |
| May 26, 2026 | Read third time. Passed. (Ayes 37. Noes 0.) Ordered to the Assembly. |
| May 18, 2026 | Read second time. Ordered to third reading. |
| May 14, 2026 | From committee: Do pass as amended. (Ayes 7. Noes 0. Page 4267.) (May 14). |
| May 14, 2026 | Read second time and amended. Ordered to second reading. |
| May 14, 2026 | From committee: Do pass as amended. (Ayes 7. Noes 0.) (May 14). |
| May 8, 2026 | Set for hearing May 14. |
| Apr 27, 2026 | April 27 hearing: Placed on APPR. suspense file. |
| Apr 17, 2026 | Set for hearing April 27. |
| Apr 14, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 15. Noes 0. Page 3842.) (April 13). Re-referred to Com. on APPR. |
| Apr 14, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 15. Noes 0.) (April 13). Re-referred to Com. on APPR. |
| Apr 2, 2026 | Set for hearing April 13. |
| Feb 26, 2026 | Referred to Com. on E., U & C. |
| Feb 19, 2026 | From printer. May be acted upon on or after March 21. |
| Feb 18, 2026 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 30, 2026 | SB 1158 Stern Senate Third Reading By Schultz | Assembly Floor |
Passed |
|
| Aug 13, 2026 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jun 24, 2026 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Energy |
Passed |
|
| May 26, 2026 | Senate 3rd Reading SB1158 Stern | Senate Floor |
Passed |
|
| May 14, 2026 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 27, 2026 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 13, 2026 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Tri County Chamber Alliance | ** Support | |
| Tri-County Chamber Alliance (TCCA) | ** Support |
SENATE THIRD READING
STR Bill Id:SB 1158
Author:(Stern)
As Amended Ver:May 14, 2026
Majority vote
SUMMARY
Requires additional information to be included in the quarterly Joint Agency Reliability Planning Assessment. Specifically, this bill requires the assessment to include:
- The status of utility transmission upgrades and electrical grid infrastructure capacity;
- California Public Utilities Commission (CPUC) approvals of applications for certificates of public convenience and necessity and permits to construct utility and independent projects.
Major Provisions
COMMENTS
Expanded Joint Reliability Planning Assessment. Existing law requires the California Energy Commission (CEC) and CPUC to submit quarterly Joint Reliability Planning Assessments to the Legislature evaluating the state's five- and ten-year electricity supply and demand outlook under a range of reliability scenarios. The assessments currently include information on existing and expected energy resources, renewable project interconnection status, and anticipated resource retirements. This bill builds on these existing reporting requirements by requiring the agencies to also report on the status of transmission upgrades, electrical grid infrastructure capacity, and CPUC approvals of certificates of public convenience and necessity (CPCNs) and permits to construct for utility and independent projects. In doing so, the bill could provide the Legislature with additional visibility into energy infrastructure development and potential reliability constraints. However, the CEC notes that the additional reporting requirements could further affect the timeliness of the quarterly assessments.
According to the Author
According to the author, "While California is leading the transition to clean energy, balancing the electrical grid and maintaining reliability without an ongoing reliance on polluting power plants remains a challenge. State energy planning has not evaluated in depth how to replace aging, polluting fossil fuel power plants with clean energy while maintaining grid and local reliability. SB 1158 will help inform grid planning and reliability by requiring the Joint Reliability Planning Assessment to include additional information on the status of energy projects specifically: approvals of applications for electrical grid infrastructure projects and the status of transmission upgrades and grid infrastructure capacity. These important additions increase planning transparency for policy makers, the public, and energy project developers."
Arguments in Support
This bill is supported by the Tri-County Chamber Alliance (TCCA), which represent chambers of commerce and business organizations across Ventura, Santa Barbara, and San Luis Obispo counties. They contend that regular reliability assessments will help identify potential grid risks associated with extreme weather, increasing electrification, and the retirement of firm generation before they result in reliability problems. TCCA also argues that this bill would help ensure that reliability planning keeps pace with California’s growing and increasingly electrified economy.
Arguments in Opposition
None on file.
FISCAL COMMENTS
According to the Assembly Committee on Appropriations, this bill creates additional workload for both the CEC and the CPUC. The CEC estimates it will require one additional Program Specialist at an annual cost of approximately $241,000 from the Energy Resources Programs Account (ERPA), while the CPUC indicates it can absorb the additional workload within existing resources.
VOTES
SENATE FLOOR: 37-0-3
YES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Durazo, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Ochoa Bogh, Padilla, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
ABS, ABST OR NV: Dahle, Gonzalez, Niello
ASM UTILITIES AND ENERGY: 17-0-1
YES: Petrie-Norris, Boerner, Calderon, Chen, Davies, Mark González, Harabedian, Hart, Irwin, Kalra, Papan, Rogers, Schiavo, Schultz, Ta, Wallis, Zbur
ABS, ABST OR NV: Patterson
ASM APPROPRIATIONS: 14-1-0
YES: Wicks, Hoover, Arambula, Calderon, Caloza, Dixon, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache, Ta
NO: Tangipa
UPDATED
VERSION: May 14, 2026
CONSULTANT: Lina V. Malova / U. & E. / (916) 319-2083 FN: 0003480
Date of Hearing: August 5, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 1158
Author:(Stern) – As Amended Ver:May 14, 2026
Policy Committee: | Utilities and Energy | Vote: | 17 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill adds to information the California Energy Commission (CEC) and the California Public Utilities Commission (CPUC) must include in their assessment of estimates of electrical supply and demand balance that existing statute requires the agencies to submit to the Legislature each quarter.
Specifically, this bill requires the quarterly assessment, known as the joint Reliability Planning Assessment, additionally include prospective information on the status of (1) utility transmission upgrades and electrical grid infrastructure capacity and (2) approvals by the CPUC of applications for certificates of public convenience and necessity (CPCNs) and permits to construct utility and independent projects.
FISCAL EFFECT:
This bill creates additional work for both the CEC and the CPUC. The CEC anticipates needing an additional program specialist, at an annual cost of $241,000 (Energy Resources Programs Account (ERPA), whereas the CPUC concludes it could absorb any additional workload with existing resources.
COMMENTS:
Existing law requires the CEC and CPUC to submit quarterly to the Legislature what statute refers to as the Joint Reliability Planning Assessment. Statute states each assessment is to identify estimates for the electrical supply and demand balance, for the forward 5- and 10-year periods, under high-, medium-, and low-risk scenarios and is to identify loads (demand for electricity) and resources online and loads and resources expected by each reliability year ending September 30, mainly with a focus on the system managed by the California Independent System Operator (CAISO) with an emphasis on the electrical demand, load, supply or resources for load-serving entities subject to the CPUC’s jurisdiction. Statute specifies information the agencies are to provide in the assessment, including, among other things, (1) prospective information on existing and expected resources, including updates on the interconnection status for renewable projects and any delays in interconnection, and (2) expected retirements for both system and local resources.
This bill, as summarized above, requires each assessment to also include prospective information on the status of (1) utility transmission upgrades and electrical grid infrastructure capacity and (2) approvals by the CPUC of applications for certificates of CPCNs (a permit to construct public infrastructure, such as electrical wires) and permits to construct utility and independent projects. According to the author, including such information in the agencies’ quarterly assessments “will help inform grid planning and reliability” and “increase planning transparency for policy makers, the public, and energy project developers.”
The committee is unaware of support for or opposition to this bill.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: June 24, 2026
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
SBPCA Bill Id:SB 1158
Author:(Stern) – As Amended Ver:May 14, 2026
SENATE VOTE: 37-0
SUBJECT: Energy: reliability planning assessment
SUMMARY: Requires additional information to be included in the quarterly Joint Agency Reliability Planning Assessment. Specifically, this bill requires the assessment to include:
- The status of utility transmission upgrades and electrical grid infrastructure capacity;
- CPUC approvals of applications for certificates of public convenience and necessity and permits to construct utility and independent projects.
EXISTING LAW:
- Requires the California Energy Commission (CEC) and the California Public Utilities Commission (CPUC), on or before December 15, 2022, and quarterly thereafter, to submit to the Legislature a joint Reliability Planning Assessment that, among other things, includes prospective information on existing and expected resources, including updates on the interconnection status for renewable projects and any delays in interconnection, and expected retirements for both system and local resources. (Public Resources Code §25233 (a))
- Requires the CEC to report in the energy almanac on California energy resources that serve load in California. (Public Resources Code § 25233(b))
FISCAL EFFECT: According to the Senate Appropriations Committee, this bill would result in ongoing costs of less than $240,000 annually for the CEC to collect and analyze additional information related to transmission upgrades and grid capacity and to incorporate that information into the Joint Quarterly Reliability Planning Assessments. The CPUC and DWR anticipate any implementation costs would be minor and absorbable.
BACKGROUND:
SB 846 (Dodd, Chapter 239, Statutes of 2022) – As part of authorizing a five-year extension of the operation of Diablo Canyon Nuclear Power Plant (DCPP), SB 846 required the California Energy Commission (CEC) and California Public Utilities Commission (CPUC) to prepare and submit quarterly Joint Agency Reliability Planning Assessments to the Legislature beginning on December 15, 2022. The assessments are required to provide specified information regarding forecasted electricity supply and demand, loads and resources within the California Independent System Operator's balancing authority area and transmission access charge areas, imports and transmission capacity, the interconnection status of renewable energy projects, and expected retirements of system and local resources. The assessments must also identify delays or barriers affecting the timely deployment of new resources and recommend actions the Legislature could take to address those barriers. Furthermore, the assessments must provide recommendations to the Legislature on actions needed to address identified delays and barriers to connecting new resources. The most recent Joint Agency Reliability Planning Assessment, the first quarterly report for 2026, was issued on May 8, 2026, is based on data available through October 1, 2025, and was combined with the annual reliability report required by SB 1020 (Laird, Chapter 361, Statutes of 2022).
COMMENTS:
- Author’s Statement. According to the author, “While California is leading the transition to clean energy, balancing the electrical grid and maintaining reliability without an ongoing reliance on polluting power plants remains a challenge. State energy planning has not evaluated in depth how to replace aging, polluting fossil fuel power plants with clean energy while maintaining grid and local reliability. SB 1158 will help inform grid planning and reliability by requiring the Joint Reliability Planning Assessment to include additional information on the status of energy projects specifically: approvals of applications for electrical grid infrastructure projects and the status of transmission upgrades and grid infrastructure capacity. These important additions increase planning transparency for policy makers, the public, and energy project developers.”
- This Bill. SB 1158 would expand the information required in the quarterly Joint Agency Reliability Planning Assessment. Specifically, the bill requires reporting on the status of transmission upgrades, electrical grid infrastructure capacity, and CPUC approvals of certificates of public convenience and necessity and permits to construct for utility and independent projects. This information could provide the Legislature with additional visibility into the development of energy infrastructure and potential constraints affecting reliability. However, the CEC notes that gathering this information would require additional data collection, analysis, and reporting. Given that the quarterly assessments have routinely been issued after their statutory deadlines, the additional reporting requirements may affect the timeliness of future reports.
- Prior Legislation.
SB 846 (Dodd) authorized a five-year extension of the operations of the DCPP, among other provisions includes a requirement for a quarterly Joint Reliability Planning Assessment. Status: Chapter 239, Statutes of 2022.
REGISTERED SUPPORT / OPPOSITION:
Support
None on file.
Opposition
None on file.
Analysis Prepared by: Lina V. Malova / U. & E. / (916) 319-2083
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 1158 |
THIRD READING
Bill No: SB 1158
Author: Stern (D)
Amended: 5/14/26
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 15-0, 4/13/26
AYES: Allen, Ochoa Bogh, Archuleta, Arreguín, Caballero, Dahle, Gonzalez, Grove, Hurtado, McNerney, Reyes, Richardson, Stern, Strickland, Wahab
NO VOTE RECORDED: Becker, Rubio
SENATE APPROPRIATIONS COMMITTEE: 7-0, 5/14/26
AYES: Cervantes, Seyarto, Cabaldon, Dahle, Grayson, Richardson, Wahab
SUBJECT: Energy: reliability planning assessment
SOURCE: Author
DIGEST:
This bill requires specified information to be included in a required quarterly energy reliability report.
ANALYSIS:
Existing law:
- Requires the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) and the California Public Utilities Commission (CPUC), on or before December 15, 2022, and quarterly thereafter, to submit to the Legislature a joint Reliability Planning Assessment that, among other things, includes prospective information on existing and expected resources, including updates on the interconnection status for renewable projects and any delays in interconnection, and expected retirements for both system and local resources. (Public Resources Code §25233 (a))
- Requires the CEC to report in the energy almanac on California energy resources that serve load in California. (Public Resources Code §25233(b))
This bill requires the Joint Reliability Planning Assessment to also include:
- The status of utility transmission upgrades and electrical grid infrastructure capacity.
- CPUC approvals of applications for certificates of public convenience and necessity and permits to construct utility and independent projects,
Background
SB 846 (Dodd, Chapter 239, Statutes of 2022). As part of authorizing a five-year extension of the operation of Diablo Canyon Nuclear Power Plant (DCPP), SB 846 mandated the CEC and CPUC to develop and provide to the Legislature quarterly Joint Agency Reliability Planning Assessments beginning on December 15, 2022. The assessments are required to provide specified information about forecasted energy supply and demand, the timing of new load and resources within the balancing authority of the CAISO and its transmission access charge areas. Additionally, the assessment is required to include information about imports, the interconnection status for renewable projects, and expected retirements for system and local resources. The assessment must also provide recommendations to the Legislature on actions needed to resolve any delays or barriers to connecting new resources. The most recent Joint Reliability Planning Assessment, the first quarterly report for 2026, was issued on May 8th and is based on data available through October 1, 2025, and is combined with the SB 1020 Annual Report.
Comments
Need for this bill. According to the author:
Our grid is under stress, especially as the impacts of climate change hit sooner than expected. And while California is strongly committed to accelerating clean energy deployment, it has yet to tackle plans for achieving a truly zero carbon, reliable electricity grid. In fact, in just the past few months several of our state agencies responsible for grid reliability have opted for extending the life of once through cooled power plants to address emergency energy demand, and increasing natural gas storage at the Aliso Canyon Natural Gas storage facility. In order for the state to meet its clean energy and reliability goals, it needs to add more transparency and better energy forecasting and planning. Tracking the progress and impediments to meeting our state energy goals should not be buried in multiple links and online reports but accessible through a user friendly dashboard charter both progress and shortcomings in order for both state and public/private partners to find the best solutions to improve our grid reliance and decarbonization.
This bill requires additional information in the quarterly report, including: the status of transmission upgrades and electrical grid infrastructure capacity, CPUC approvals of applications for utility certificates of public convenience and necessity and permits to construct utility and independent projects. The CEC notes extensive work that would be needed to gather information on transmission upgrades and electric grid capacity, conduct additional analysis, and write new sections of the report. The quarterly report has routinely been delayed. The required new information proposed by this bill may result in further delays for future reports.
Prior/Related Legislation
SB 846 (Dodd, Chapter 239, Statutes of 2022) authorized a five-year extension of the operations of the DCPP, among other provisions includes a requirement for a quarterly Joint Reliability Planning Assessment.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Senate Appropriations Committee:
- Ongoing costs of less than $240,000 annually (Energy Resource Program Account [ERPA] or General Fund) for the California Energy Commission (CEC) to gather the expanded information on transmission upgrades, grid capacity, and as required by this bill. The CEC would need to synthesize the information into the broader context of energy reliability, perform analysis including potential model improvements, and write new sections of the Joint Quarterly Reliability Planning Assessments. The CEC notes that ERPA often experiences structural shortfall and may not be an appropriate fund source to support implementation of this bill.
- The California Public Utilities Commission (CPUC) and Department of Water Resources (DWR) anticipate any costs would be minor and absorbable.
SUPPORT: (Verified 5/14/26)
Tri County Chamber Alliance
OPPOSITION: (Verified 5/14/26)
None received
ARGUMENTS IN SUPPORT: According to the Tri-County Chamber Alliance representing the counties of San Luis Obispo, Santa Barbara and Ventura, states:
Energy reliability is fundamental to business continuity. Power outages and grid instability cost businesses in our region millions of dollars in lost productivity, equipment damage, and supply chain disruptions. As California accelerates its clean energy transition, robust reliability planning is essential to ensure businesses are not left without the power they need to operate and grow. TCCA [Tri-County Chamber Alliance] supports SB 1158 because it prioritizes grid reliability, supports business continuity, and ensures energy planning keeps pace with the demands of a growing electrifying economy.
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
5/18/26 15:21:11
**** END ****
SENATE COMMITTEE ON
Senator Sabrina Cervantes, Chair
2025 - 2026 Regular Session
SB 1158 (Stern) - Energy: reliability planning assessment
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would require specified information to be included in a required quarterly energy reliability report.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on May 14, 2026
Fiscal Impact:
- Ongoing costs of less than $240,000 annually (Energy Resource Program Account [ERPA] or General Fund) for the California Energy Commission (CEC) to gather the expanded information on transmission upgrades, grid capacity, and as required by this bill. The CEC would need to synthesize the information into the broader context of energy reliability, perform analysis including potential model improvements, and write new sections of the Joint Quarterly Reliability Planning Assessments. The CEC notes that ERPA often experiences structural shortfall and may not be an appropriate fund source to support implementation of this bill.
- The California Public Utilities Commission (CPUC) and Department of Water Resources (DWR) anticipate any costs would be minor and absorbable.
Author Amendments:
Author amendments would eliminate the status of permit applications and fossil fuel usage by DWR facilities from the information that the CEC would be required to collect.
-- END --
SENATE COMMITTEE ON
Senator Sabrina Cervantes, Chair
2025 - 2026 Regular Session
SB 1158 (Stern) - Energy: reliability planning assessment
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would require specified information to be included in a required quarterly energy reliability report.
Fiscal Impact:
- The California Energy Commission (CEC) estimates ongoing costs of $241,000 annually (Energy Resource Program Account [ERPA] or General Fund) for one position to gather the expanded information on transmission upgrades, grid capacity, and permits and applications as required by this bill. This position would also be needed to synthesize the information into the broader context of energy reliability, perform analysis including potential model improvements, and write new sections of the Joint Quarterly Reliability Planning Assessments. The CEC notes that ERPA often experiences structural shortfall and may not be an appropriate fund source to support implementation of this bill.
- The California Public Utilities Commission (CPUC) and Department of Water Resources (DWR) anticipate any costs would be minor and absorbable.
Background:
SB 846 (Dodd, Chapter 239, Statutes of 2022). As part of authorizing a five-year extension of the operation of Diablo Canyon Nuclear Power Plant (DCPP), SB 846 mandated the CEC and CPUC to develop and provide to the Legislature quarterly Joint Agency Reliability Planning Assessments beginning on December 15, 2022. The assessments are required to provide specified information about forecasted energy supply and demand, the timing of new load and resources within the balancing authority of the CAISO and its transmission access charge areas. Additionally, the assessment is required to include information about imports, the interconnection status for renewable projects, and expected retirements for system and local resources. The assessment must also provide recommendations to the Legislature on actions needed to resolve any delays or barriers to connecting new resources. The most recent Joint Reliability Planning Assessment, the fourth quarterly report, was issued on January 20th earlier this year. It’s been common the assessments have been delayed by months from their anticipated issuance.
Electricity Supply Strategic Reliability Reserve Program (ESSRRP) at the DWR (funded at $2.3 billion). In June 2022, Budget Trailer Bills, AB 205 (Committee on Budget, Chapter 61, Statutes of 2022), AB 178 (Ting, Chapter 45, Statutes of 2022), and AB 180 (Ting, Chapter 44, Statutes of 2022), were signed into law. These three pieces of legislation collectively established the ESSRRP and set forth new responsibilities and activities by DWR, funded by the newly established Electricity Supply Strategic Reliability Reserve Fund (ESSRRF), and separate from the State Water Project. DWR acts as an electric grid reliability backstop for the state of California by procuring and providing incremental power during extreme events. Under the ESSRRP, DWR acts as contingency insurance to help maintain electricity reliability. As part of the program, DWR contracts directly with power facilities and also enters into agreements with the state’s large electric investor-owned utilities (IOUs) to reimburse for the value of imported firm energy resources to support summer reliability.
Proposed Law:
This bill would:
- Require the Joint Reliability Planning Assessment to include:
- the status of utility transmission upgrades and electrical grid infrastructure capacity,
- CPUC approvals of applications for certificates of public convenience and necessity and permits to construct utility and independent projects, and
- applications for permits for projects from the CEC and the queue of projects from the California Independent System Operator (CAISO), include the expected completion dates for both system and local resources.
- Require the Joint Reliability Planning Assessment to report on the use of fossil fuel by certain facilities constructed by, purchased by, or under contract with, the Department of Water Resources (DWR), as specified.
Related Legislation:
SB 846 (Dodd, Chapter 239, Statutes of 2022) authorized a five-year extension of the operations of the DCPP, among other provisions includes a requirement for a quarterly Joint Reliability Planning Assessment.
Staff Comments: Section 25233 of this bill would require reporting on the use of fossil fuels by facilities contracted with by DWR under the Electricity Supply Strategic Reliability Reserve Program (authorized by Water Code Section 80710). Existing law (in Water Code Section 80730) includes direction for DWR to report four times per year on the status of this program. Specifically, it requires the inclusion of “the emissions of greenhouse gases, criteria air pollutants, and toxic air contaminants emitted by the resources funded by DWR over the period since the previous report.” The new reporting of fossil fuel use by facilities in the CPUC/CEC assessment as would be required by this bill may be duplicative of existing DWR reporting on GHGs emitted (from the fossil fuels used) by the same facilities.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Benjamin Allen, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 4/13/2026
Author: | |||
Version: | Introduced | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill requires specified information to be included in a required quarterly energy reliability report.
ANALYSIS:
Existing law:
- Requires the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) and the California Public Utilities Commission (CPUC), on or before December 15, 2022, and quarterly thereafter, to submit to the Legislature a joint Reliability Planning Assessment that, among other things, includes prospective information on existing and expected resources, including updates on the interconnection status for renewable projects and any delays in interconnection, and expected retirements for both system and local resources. (Public Resources Code §25233 (a))
- Requires the CEC to report in the energy almanac on California energy resources that serve load in California. (Public Resources Code §25233(b))
This bill:
- Requires the Joint Reliability Planning Assessment to include:
- the status of utility transmission upgrades and electrical grid infrastructure capacity,
- CPUC approvals of applications for certificates of public convenience and necessity and permits to construct utility and independent projects, and
- applications for permits for projects from the CEC and the queue of projects from the California Independent System Operator (CAISO), include the expected completion dates for both system and local resources.
- Requires the Joint Reliability Planning Assessment to report on the use of fossil fuel by certain facilities constructed by, purchased by, or under contract with, the Department of Water Resources (DWR), as specified.
Background
SB 846 (Dodd, Chapter 239, Statutes of 2022). As part of authorizing a five-year extension of the operation of Diablo Canyon Nuclear Power Plant (DCPP), SB 846 mandated the CEC and CPUC to develop and provide to the Legislature quarterly Joint Agency Reliability Planning Assessments beginning on December 15, 2022. The assessments are required to provide specified information about forecasted energy supply and demand, the timing of new load and resources within the balancing authority of the CAISO and its transmission access charge areas. Additionally, the assessment is required to include information about imports, the interconnection status for renewable projects, and expected retirements for system and local resources. The assessment must also provide recommendations to the Legislature on actions needed to resolve any delays or barriers to connecting new resources. The most recent Joint Reliability Planning Assessment, the fourth quarterly report, was issued on January 20th earlier this year. It’s been common the assessments have been delayed by months from their anticipated issuance.
Electricity Supply Strategic Reliability Reserve Program (ESSRRP) at the DWR (funded at $2.3 billion). In June 2022, Budget Trailer Bills, AB 205 (Committee on Budget, Chapter 61, Statutes of 2022), AB 178 (Ting, Chapter 45, Statutes of 2022), and AB 180 (Ting, Chapter 44, Statutes of 2022), were signed into law. These three pieces of legislation collectively established the ESSRRP and set forth new responsibilities and activities by DWR, funded by the newly established Electricity Supply Strategic Reliability Reserve Fund (ESSRRF), and separate from the State Water Project. DWR acts as an electric grid reliability backstop for the state of California by procuring and providing incremental power during extreme events. Under the ESSRRP, DWR acts as contingency insurance to help maintain electricity reliability. As part of the program, DWR contracts directly with power facilities and also enters into agreements with the state’s large electric investor-owned utilities (IOUs) to reimburse for the value of imported firm energy resources to support summer reliability.
Comments
Need for this bill. According to the author:
Our grid is under stress, especially as the impacts of climate change hit sooner than expected. And while California is strongly committed to accelerating clean energy deployment, it has yet to tackle plans for achieving a truly zero carbon, reliable electricity grid. In fact, in just the past few months several of our state agencies responsible for grid reliability have opted for extending the life of once through cooled power plants to address emergency energy demand, and increasing natural gas storage at the Aliso Canyon Natural Gas storage facility. In order for the state to meet its clean energy and reliability goals, it needs to add more transparency and better energy forecasting and planning. Tracking the progress and impediments to meeting our state energy goals should not be buried in multiple links and online reports but accessible through a user friendly dashboard charter both progress and shortcomings in order for both state and public/private partners to find the best solutions to improve our grid reliance and decarbonization.
This bill requires additional information in the assessment, including: the status of transmission upgrades and electrical grid infrastructure capacity, CPUC approvals of applications for utility certificates of public convenience and necessity and permits to construct utility and independent projects, the status of projects at the CEC and the queue of projects from the CAISO. This bill also requires reporting on the use of fossil fuel by facilities constructed, purchased, or under contract with the DWR as part of the ESSRRP. This information is currently reported in DWR’s program report on the ESSRRP. The author’s desire to include additional information in the quarterly Joint Reliability Planning Assessment seems reasonable. However, as this bill moves forward the author may wish to consider whether the added detail of some of the information could further delay future delivery of the quarterly reports.
Prior/Related Legislation
SB 846 (Dodd, Chapter 239, Statutes of 2022) authorized a five-year extension of the operations of the DCPP, among other provisions includes a requirement for a quarterly Joint Reliability Planning Assessment.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
Tri-County Chamber Alliance
OPPOSITION:
None received
ARGUMENTS IN SUPPORT: According to the Tri-County Chamber Alliance representing the counties of San Luis Obispo, Santa Barbara and Ventura, states:
Energy reliability is fundamental to business continuity. Power outages and grid instability cost businesses in our region millions of dollars in lost productivity, equipment damage, and supply chain disruptions. As California accelerates its clean energy transition, robust reliability planning is essential to ensure businesses are not left without the power they need to operate and grow. TCCA [Tri-County Chamber Alliance] supports SB 1158 because it prioritizes grid reliability, supports business continuity, and ensures energy planning keeps pace with the demands of a growing electrifying economy.
-- END --
Discussed in Hearing
Assembly Floor
Assembly Standing Committee on Utilities and Energy
Senate Floor
Senate Standing Committee on Energy, Utilities and Communications
Bill Author
Bill Co-Author(s):