SB 1196: Small energization projects: electrical service connections.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2026-09-27
Current Status:
Passed
(2026-09-27: Chaptered by Secretary of State. Chapter 684, Statutes of 2026.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
The Powering Up Californians Act requires the Public Utilities Commission to determine the criteria for timely service for electrical customers to be energized, including, among other things, categories of timely electric service through energization, as specified. The act requires the commission to establish reasonable average and maximum target energization time periods to ensure that work is completed in a manner that minimizes delay in meeting the date requested by an electrical customer to the greatest extent possible.
This bill would require the commission, by September 30, 2027, in a new or existing proceeding, to establish timelines for electrical corporations to respond to and process requests to energize small energization projects, as provided. The bill would require the commission, in establishing the timelines for energization, to require electrical corporations to comply with certain requirements.
Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above-described provisions would be part of the act and a violation of a commission action implementing the bills requirements would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The Powering Up Californians Act requires the Public Utilities Commission to determine the criteria for timely service for electrical customers to be energized, including, among other things, categories of timely electric service through energization, as specified. The act requires the commission to establish reasonable average and maximum target energization time periods to ensure that work is completed in a manner that minimizes delay in meeting the date requested by an electrical customer to the greatest extent possible.
This bill would require the commission, by September 30, 2027, in a new or existing proceeding, to establish timelines for electrical corporations to respond to and process requests to energize small energization projects, as provided. The bill would require the commission, in establishing the timelines for energization, to require electrical corporations to comply with certain requirements.
Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above-described provisions would be part of the act and a violation of a commission action implementing the bills requirements would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The Powering Up Californians Act requires the Public Utilities Commission to determine the criteria for timely service for electrical customers to be energized, including, among other things, categories of timely electric service through energization, as specified. The act requires the commission to establish reasonable average and maximum target energization time periods to ensure that work is completed in a manner that minimizes delay in meeting the date requested by an electrical customer to the greatest extent possible.
This bill would require the commission, by September 30, 2027, in a new or existing proceeding, to establish timelines for electrical corporations to respond to and process requests to energize accessory dwelling units and junior accessory dwelling units, small energization projects, as provided. The bill would require the commission, in establishing the timelines for energization, to require electrical corporations to comply with certain requirements.
Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above-described provisions would be part of the act and a violation of a commission action implementing the bills requirements would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The Powering Up Californians Act requires the Public Utilities Commission to determine the criteria for timely service for electrical customers to be energized, including, among other things, categories of timely electric service through energization, as specified. The act requires the commission to establish reasonable average and maximum target energization time periods to ensure that work is completed in a manner that minimizes delay in meeting the date requested by an electrical customer to the greatest extent possible.
This bill would require the commission, by September 30, 2027, in a new or existing proceeding, to establish timelines for electrical corporations to respond to and process requests to energize accessory dwelling units and junior accessory dwelling units, as provided. The bill would require the commission, in establishing the timelines for energization, to require electrical corporations to comply with certain requirements.
Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above-described provisions would be part of the act and a violation of a commission action implementing the bills requirements would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, the Planning and Zoning Law, among other things, provides for the creation by ordinance, or by ministerial approval if the local agency has not adopted an ordinance, of an accessory dwelling unit (ADU) or a junior accessory dwelling unit (JADU) in accordance with specified standards and conditions. Existing law authorizes a local agency, special district, or water corporation to require a new or separate utility connection directly between the unit and the utility for certain ADUs, as provided.This bill would require a local agency to post on its internet website or distribute in written form to an applicant a comprehensive list of requirements for utility service connections that may be required for an ADU or JADU and contact information for each of the utilities that provide service in the jurisdiction.By imposing new duties on local agencies, the bill would impose a state-mandated local program. Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations, gas corporations, sewer system corporations, and water corporations, while local publicly owned utilities, including municipal utility districts, public utility districts, and irrigation districts, are under the direction of their governing boards. Existing law, for a new housing construction, requires those utilities to publicly post on their internet websites a schedule of estimated fees for typical service connections for each housing development type and the estimated timeframes for completing typical service connections needed for each housing type, excepted as provided.This bill would require each of the above-described utilities to post on its internet website a comprehensive checklist of items that an applicant is required to submit to the utility for an application for obtaining a service connection to an ADU or JADU to be deemed complete, to provide an option for the applicant to engage with staff for preapplication project review, and to provide upfront estimated costs for the applicants planning purposes, as provided. The bill would establish a process by which utilities are required to review the submission of an application to determine whether the application is deemed complete, as provided. For an electrical service connection, the bill would require the utility providing electrical service, within 15 business days of determining an application is complete, to make a load assessment for the ADU or JADU and to inform the applicant whether a new electrical panel or electrical meter is required to provide the service connection, as specified, and would require the utility, within 10 business days of a notification that the new electrical panel or electrical meter has been installed, to verify that the installation is completed. The bill would require a utility, within 30 days of a notification that the construction of the ADU or JADU is complete, to complete the service connection to the dwelling unit, as specified. The bill would authorize an applicant to submit, in writing, a complaint to the commission if the utility has violated the requirements of the bill and would require the commission to assess civil penalties, as provided, for violations of the requirements of the bill.Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.Because a violation of a commission action implementing certain requirements of the bill would be a crime, this bill would impose a state-mandated local program.The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for specified reasons.Existing law, the Planning and Zoning Law, among other things, provides for the creation by ordinance, or by ministerial approval if the local agency has not adopted an ordinance, of an accessory dwelling unit (ADU) or a junior accessory dwelling unit (JADU) in accordance with specified standards and conditions. Existing law authorizes a local agency, special district, or water corporation to require a new or separate utility connection directly between the unit and the utility for certain ADUs, as provided.
This bill would require a local agency to post on its internet website or distribute in written form to an applicant a comprehensive list of requirements for utility service connections that may be required for an ADU or JADU and contact information for each of the utilities that provide service in the jurisdiction.
By imposing new duties on local agencies, the bill would impose a state-mandated local program.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations, gas corporations, sewer system corporations, and water corporations, while local publicly owned utilities, including municipal utility districts, public utility districts, and irrigation districts, are under the direction of their governing boards. Existing law, for a new housing construction, requires those utilities to publicly post on their internet websites a schedule of estimated fees for typical service connections for each housing development type and the estimated timeframes for completing typical service connections needed for each housing type, excepted as provided.
This bill would require each of the above-described utilities to post on its internet website a comprehensive checklist of items that an applicant is required to submit to the utility for an application for obtaining a service connection to an ADU or JADU to be deemed complete, to provide an option for the applicant to engage with staff for preapplication project review, and to provide upfront estimated costs for the applicants planning purposes, as provided. The bill would establish a process by which utilities are required to review the submission of an application to determine whether the application is deemed complete, as provided. For an electrical service connection, the bill would require the utility providing electrical service, within 15 business days of determining an application is complete, to make a load assessment for the ADU or JADU and to inform the applicant whether a new electrical panel or electrical meter is required to provide the service connection, as specified, and would require the utility, within 10 business days of a notification that the new electrical panel or electrical meter has been installed, to verify that the installation is completed. The bill would require a utility, within 30 days of a notification that the construction of the ADU or JADU is complete, to complete the service connection to the dwelling unit, as specified. The bill would authorize an applicant to submit, in writing, a complaint to the commission if the utility has violated the requirements of the bill and would require the commission to assess civil penalties, as provided, for violations of the requirements of the bill.
Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing certain requirements of the bill would be a crime, this bill would impose a state-mandated local program.
The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law defines various terms for purposes of provisions that regulate accessory dwelling unit approvals by local agencies.This bill would make a nonsubstantive change to those provisions.Existing law defines various terms for purposes of provisions that regulate accessory dwelling unit approvals by local agencies.
This bill would make a nonsubstantive change to those provisions.
For purposes of this article, the following definitions apply:
(a)Electrification means any new, expanded, or change in use of electricity related to the policies described in Section 933, including, but not limited to, in the industrial, commercial, agricultural, housing, or transportation sectors.
(b)Energization and energize mean connecting customers to the electrical distribution grid and establishing adequate electrical distribution capacity or upgrading electrical distribution or transmission capacity to provide electrical service for a new customer, or to provide upgraded electrical service to an existing customer. The determination of adequate electrical distribution capacity includes consideration of future load. Energization and energize do not include activities related to connecting electrical supply resources.
(c)Energization time period means the elapsed time beginning when the electrical corporation receives a substantially complete energization project application and ending when the electric service is installed and energized.
(d)(1)Except as provided in paragraph (2), small energization project means an energization project that does not require distribution or service line extensions or upgrades under the line extension framework adopted by the commission pursuant to Section 783 and implemented in the Electric Rule 15 tariff or Electric Rule 16 tariff, or any successor or substantially similar tariffs adopted by the commission governing distribution or service line extensions or upgrades by an electrical corporation.
(2)Small energization project includes an energization project that does not require distribution or service line extensions and whose only upgrade is a new electric meter required by an electric corporation or local jurisdiction.
SEC. 2.Section 934.5 is added to the Public Utilities Code, to read:934.5.(a)The commission, in a new or existing proceeding, shall, by September 30, 2027, establish timelines for electrical corporations to respond to and process requests to energize small energization projects.
(b)In establishing the timelines, the commission shall do all of the following:
(1)Establish the times by which an application received by an electrical corporation shall be determined to be complete and by which the determination is to be communicated to the applicant.
(2)Require an electrical corporation, in response to an individual application, to provide a list of deficiencies for an application determined to be incomplete and an explanation of how the applicant may remedy the deficiencies.
(3)Establish the time by which an electrical corporation is required to notify the applicant of a complete application.
(4)Determine the penalties that shall be assessed on an electrical corporation for failing to comply with the timelines established by the commission pursuant to this section.
(c)In establishing the timelines, the commission may consider a modification to shorten the timelines established pursuant to Section 934.
(d)In establishing timelines for energization of small energization projects, the commission shall require electrical corporations to comply with all of the following:
(1)Allow an application for energization to be submitted with the electrical corporation at the same time an applicant applies for a building permit with the local permitting agency.
(2)Not cancel an application for energization without the applicants consent, unless the applicant fails to respond to the electrical corporation within a timeline established by the commission.
(3)Provide the applicant and the electrical corporation the opportunity to extend the timeline if the applicant or electrical corporation requests a delay in completing the service connection and the applicant and electrical corporation both agree.
(4)Provide the applicant with an option to engage with electrical corporation staff for preapplication project review.
(5)Provide the applicant with the electrical corporations estimates of costs for the completed application that include estimates of all related fees, charges, and potential upgrades to electrical corporation infrastructure, including for increases in the amount of electricity to the property, that may be needed for energization.
(6)An electrical corporations compliance with this section shall complement, and not conflict with, any rule, order, or determination by the commission pursuant to this article.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
For purposes of this article, the following definitions apply:
(a)Electrification means any new, expanded, or change in use of electricity related to the policies described in Section 933, including, but not limited to, in the industrial, commercial, agricultural, housing, or transportation sectors.
(b)Energization and energize mean connecting customers to the electrical distribution grid and establishing adequate electrical distribution capacity or upgrading electrical distribution or transmission capacity to provide electrical service for a new customer, or to provide upgraded electrical service to an existing customer. The determination of adequate electrical distribution capacity includes consideration of future load. Energization and energize do not include activities related to connecting electrical supply resources.
(c)Energization time period means the elapsed time beginning when the electrical corporation receives a substantially complete energization project application and ending when the electric service is installed and energized.
(d)(1)Except as provided in paragraph (2), small energization project means an energization project that does not require distribution or service line extensions or upgrades under the line extension framework adopted by the commission pursuant to Section 783 and implemented in the Electric Rule 15 tariff or Electric Rule 16 tariff, or any successor or substantially similar tariffs adopted by the commission governing distribution or service line extensions or upgrades by an electrical corporation.
(2)Small energization project includes an energization project that does not require distribution or service line extensions and whose only upgrade is a new electric meter required by an electric corporation or local jurisdiction.
SEC. 2.Section 934.5 is added to the Public Utilities Code, to read:934.5.(a)The commission, in a new or existing proceeding, shall, by September 30, 2027, establish timelines for electrical corporations to respond to and process requests to energize small energization projects.
(b)In establishing the timelines, the commission shall do all of the following:
(1)Establish the times by which an application received by an electrical corporation shall be determined to be complete and by which the determination is to be communicated to the applicant.
(2)Require an electrical corporation, in response to an individual application, to provide a list of deficiencies for an application determined to be incomplete and an explanation of how the applicant may remedy the deficiencies.
(3)Establish the time by which an electrical corporation is required to notify the applicant of a complete application.
(4)Determine the penalties that shall be assessed on an electrical corporation for failing to comply with the timelines established by the commission pursuant to this section.
(c)In establishing the timelines, the commission may consider a modification to shorten the timelines established pursuant to Section 934.
(d)In establishing timelines for energization of small energization projects, the commission shall require electrical corporations to comply with all of the following:
(1)Allow an application for energization to be submitted with the electrical corporation at the same time an applicant applies for a building permit with the local permitting agency.
(2)Not cancel an application for energization without the applicants consent, unless the applicant fails to respond to the electrical corporation within a timeline established by the commission.
(3)Provide the applicant and the electrical corporation the opportunity to extend the timeline if the applicant or electrical corporation requests a delay in completing the service connection and the applicant and electrical corporation both agree.
(4)Provide the applicant with an option to engage with electrical corporation staff for preapplication project review.
(5)Provide the applicant with the electrical corporations estimates of costs for the completed application that include estimates of all related fees, charges, and potential upgrades to electrical corporation infrastructure, including for increases in the amount of electricity to the property, that may be needed for energization.
(6)An electrical corporations compliance with this section shall complement, and not conflict with, any rule, order, or determination by the commission pursuant to this article.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
For purposes of this article, the following definitions apply:
(a)Accessory dwelling unit has the same meaning as set forth in Section 66313 of the Government Code.(b)(a)Electrification means any new, expanded, or change in use of electricity related to the policies described in Section 933, including, but not limited to, in the industrial, commercial, agricultural, housing, or transportation sectors.
(c)(b)Energization and energize mean connecting customers to the electrical distribution grid and establishing adequate electrical distribution capacity or upgrading electrical distribution or transmission capacity to provide electrical service for a new customer, or to provide upgraded electrical service to an existing customer. The determination of adequate electrical distribution capacity includes consideration of future load. Energization and energize do not include activities related to connecting electrical supply resources.
(d)(c)Energization time period means the elapsed time beginning when the electrical corporation receives a substantially complete energization project application and ending when the electric service is installed and energized.
(e)Junior accessory dwelling unit has the same meaning as set forth in Section 66313 of the Government Code.(d)(1)Except as provided in paragraph (2), small energization project means an energization project that does not require distribution or service line extensions or upgrades under the line extension framework adopted by the commission pursuant to Section 783 and implemented in the Electric Rule 15 tariff or Electric Rule 16 tariff, or any successor or substantially similar tariffs adopted by the commission governing distribution or service line extensions or upgrades by an electrical corporation.
(2)Small energization project includes an energization project that does not require distribution or service line extensions and whose only upgrade is a new electric meter required by an electric corporation or local jurisdiction.
SEC. 2.Section 934.5 is added to the Public Utilities Code, to read:934.5.(a)The commission, in a new or existing proceeding, shall, by September 30, 2027, establish timelines for electrical corporations to respond to and process requests to energize an accessory dwelling unit and junior accessory dwelling unit. small energization projects.
(b)In establishing the timelines, the commission shall do all of the following:
(1)Establish the times by which an application received by an electrical corporation shall be determined to be complete and by which the determination is to be provided in writing communicated to the applicant.
(2)Require an electrical corporation corporation, in response to an individual application, to provide a list of deficiencies for an application determined to be incomplete and an explanation of how the applicant may remedy the deficiencies.
(3)Establish the time by which an electrical corporation is required to respond to a cured notify the applicant of a complete application.
(4)Establish the time by which an electrical corporation is required to provide a load assessment for an accessory dwelling unit and inform the applicant as to whether a new electrical panel or electrical meter is required to provide the electrical service connection.(5)Establish the time by which an electrical corporation is required to verify that the installation of an electrical panel is complete.(6)Establish the time by which an electrical corporation is required to complete the service connection after the applicant provides notification to the electrical corporation that the construction of a new accessory dwelling unit is complete.(7)Establish a process for an applicant for an accessory dwelling unit or a junior accessory dwelling unit to file a complaint with the commission for a violation of these requirements.(8)(4)Determine the penalties that shall be assessed on an electrical corporation for failing to comply with the timelines established by the commission pursuant to this section.
(c)In establishing the timelines, the commission may consider a modification to shorten the timelines established pursuant to Section 934 for the sole purpose of expediting requests to energize an accessory dwelling unit or junior accessory dwelling unit. 934.
(d)In establishing timelines for energization of an accessory dwelling unit or junior accessory dwelling unit, small energization projects, the commission shall require electrical corporations to comply with all of the following:
(1)Allow an application for energization to be submitted with the electrical corporation at the same time an applicant applies for a building permit with the local permitting agency.
(2)Not cancel an application for energization for an accessory dwelling unit or a junior accessory dwelling unit without the applicants consent. consent, unless the applicant fails to respond to the electrical corporation within a timeline established by the commission.
(3)Provide the applicant and the electrical corporation the opportunity to extend the timeline if the applicant or electrical corporation requests a delay in completing the service connection. connection and the applicant and electrical corporation both agree.
(4)Provide the applicant with an option to engage with electrical corporation staff for preapplication project review.
(5)Provide the applicant with the electrical corporations upfront estimates of costs for the applicants planning purposes completed application that include estimates of all related fees, charges, and potential upgrades to electrical corporation infrastructure, including for increases in the amount of electricity to the property, that may be needed for energization.
(6)An electrical corporations compliance with this section shall complement, and not conflict with, any rule, order, or determination by the commission pursuant to this article.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
For purposes of this article, the following definitions apply:
(a)Accessory dwelling unit has the same meaning as set forth in Section 66313 of the Government Code.
(a)(b)Electrification means any new, expanded, or change in use of electricity related to the policies described in Section 933, including, but not limited to, in the industrial, commercial, agricultural, housing, or transportation sectors.
(b)(c)Energization and energize mean connecting customers to the electrical distribution grid and establishing adequate electrical distribution capacity or upgrading electrical distribution or transmission capacity to provide electrical service for a new customer, or to provide upgraded electrical service to an existing customer. The determination of adequate electrical distribution capacity includes consideration of future load. Energization and energize do not include activities related to connecting electrical supply resources.
(c)(d)Energization time period means the elapsed time beginning when the electrical corporation receives a substantially complete energization project application and ending when the electric service is installed and energized.
(e)Junior accessory dwelling unit has the same meaning as set forth in Section 66313 of the Government Code.
SEC. 2.Section 934.5 is added to the Public Utilities Code, to read:934.5.(a)The commission, in a new or existing proceeding, shall, by September 30, 2027, establish timelines for electrical corporations to respond to and process requests to energize an accessory dwelling unit and junior accessory dwelling unit.
(b)In establishing the timelines, the commission shall do all of the following:
(1)Establish the times by which an application received by an electrical corporation shall be determined to be complete and by which the determination is to be provided in writing to the applicant.
(2)Require an electrical corporation to provide a list of deficiencies for an application determined to be incomplete and an explanation of how the applicant may remedy the deficiencies.
(3)Establish the time by which an electrical corporation is required to respond to a cured application.
(4)Establish the time by which an electrical corporation is required to provide a load assessment for an accessory dwelling unit and inform the applicant as to whether a new electrical panel or electrical meter is required to provide the electrical service connection.
(5)Establish the time by which an electrical corporation is required to verify that the installation of an electrical panel is complete.
(6)Establish the time by which an electrical corporation is required to complete the service connection after the applicant provides notification to the electrical corporation that the construction of a new accessory dwelling unit is complete.
(7)Establish a process for an applicant for an accessory dwelling unit or a junior accessory dwelling unit to file a complaint with the commission for a violation of these requirements.
(8)Determine the penalties that shall be assessed on an electrical corporation for failing to comply with the timelines established by the commission pursuant to this section.
(c)In establishing the timelines, the commission may consider a modification to shorten the timelines established pursuant to Section 934 for the sole purpose of expediting requests to energize an accessory dwelling unit or junior accessory dwelling unit.
(d)In establishing timelines for energization of an accessory dwelling unit or junior accessory dwelling unit, the commission shall require electrical corporations to comply with all of the following:
(1)Allow an application for energization to be submitted with the electrical corporation at the same time an applicant applies for a building permit with the local permitting agency.
(2)Not cancel an application for energization for an accessory dwelling unit or a junior accessory dwelling unit without the applicants consent.
(3)Provide the applicant the opportunity to extend the timeline if the applicant requests a delay in completing the service connection.
(4)Provide the applicant with an option to engage with electrical corporation staff for preapplication project review.
(5)Provide the applicant with the electrical corporations upfront estimates of costs for the applicants planning purposes that include estimates of all related fees, charges, and potential upgrades to electrical corporation infrastructure, including for increases in the amount of electricity to the property, that may be needed for energization.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Section 66311.5 of the Government Code is amended to read:66311.5.(a)Fees charged for the construction of accessory dwelling units or junior accessory dwelling units shall be determined in accordance with Chapter 5 (commencing with Section 66000) and Chapter 7 (commencing with Section 66012).(b)An accessory dwelling unit or junior accessory dwelling unit shall not be considered by a local agency, special district, or water corporation to be a new residential use for purposes of calculating connection fees or capacity charges for utilities, including water and sewer service, unless the unit was constructed with a new single-family dwelling.(c)(1)A local agency, special district, or water corporation shall not impose any impact fee upon the development of an accessory dwelling unit that has 750 square feet of interior livable space or less or a junior accessory dwelling unit that has 500 square feet of interior livable space or less. Any impact fees charged for an accessory dwelling unit that has more than 750 square feet of interior livable space shall be charged proportionately in relation to the square footage of the primary dwelling unit.(2)For purposes of this subdivision, impact fee has the same meaning as the term fee is defined in subdivision (b) of Section 66000, except that it also includes fees specified in Section 66477. Impact fee does not include any connection fee or capacity charge charged by a local agency, special district, or water corporation.(3)For the purposes of this section and Section 17620 of the Education Code, an accessory dwelling unit or junior accessory dwelling unit that contains less than 500 square feet of interior livable space shall, for the purpose of subparagraph (C) of paragraph (1) of subdivision (a) of Section 17620 of the Education Code, be considered other residential construction that does not increase assessable space by 500 square feet.(d)For an accessory dwelling unit or a junior accessory dwelling unit described in paragraph (1) of subdivision (a) of Section 66323, a local agency, special district, or water corporation shall not require the applicant to install a new or separate utility connection directly between the unit and the utility or impose a related connection fee or capacity charge, unless the unit was constructed with a new single-family dwelling, or upon separate conveyance of the accessory dwelling unit pursuant to Section 66342.(e)For an accessory dwelling unit that is not described in paragraph (1) of subdivision (a) of Section 66323, a local agency, special district, or water corporation may require a new or separate utility connection directly between the accessory dwelling unit and the utility. Consistent with Section 66013, the connection may be subject to a connection fee or capacity charge that shall be proportionate to the burden of the proposed accessory dwelling unit, based upon either its square feet or the number of its drainage fixture unit (DFU) values, as defined in the Uniform Plumbing Code adopted and published by the International Association of Plumbing and Mechanical Officials, upon the water or sewer system. This fee or charge shall not exceed the reasonable cost of providing this service.(f)A local agency shall post on its internet website or distribute in written form to an applicant a comprehensive list of requirements for utility service connections that may be required for an accessory dwelling unit or junior accessory dwelling unit and contact information for each of the utilities that provide service in the jurisdiction.SEC. 2.The heading of Chapter 9 (commencing with Section 8400) of Division 4.1 of the Public Utilities Code is amended to read:9.Electrical, Gas, Sewer, and Water Service for Housing ConstructionSEC. 3.Section 8400 of the Public Utilities Code is amended to read:8400.As used in this chapter, all of the following definitions apply:(a)Accessory dwelling unit has the same meaning as set forth in Section 66313 of the Government Code.(b)Junior accessory dwelling unit has the same meaning as set forth in Section 66313 of the Government Code.(c)Utility means any of the following that furnish electrical, gas, water, or sewer service, or a combination of those services, where the service is performed for, or the commodity is delivered to, the public or a portion of the public:(1)An electrical corporation, as defined in Section 218.(2)A gas corporation, as defined in Section 222.(3)A sewer system corporation, as defined in Section 230.6.(4)A water corporation, as defined in Section 241.(5)A municipality or municipal corporation operating as a public utility pursuant to Division 5 (commencing with Section 10001).(6)A municipal utility district formed pursuant to the Municipal Utility District Act (Division 6 (commencing with Section 11501)).(7)A public utility district formed pursuant to The Public Utility District Act (Division 7 (commencing with Section 15501)).(8)An irrigation district formed pursuant to the Irrigation District Law (Division 11 (commencing with Section 20500) of the Water Code).(9)A joint powers authority that includes one or more of the entities described in subdivisions (e) to (h), inclusive, and that owns electrical, gas, water, or sewer facilities, or furnishes electrical, gas, water, or sewer service over its own or its members system.SEC. 4.Section 8402 is added to the Public Utilities Code, to read:8402.(a)For purposes of this section, both of the following definitions apply:(1)Applicant means a person or entity submitting an application.(2)Application means an application for obtaining a service connection to an accessory dwelling unit or junior accessory dwelling units.(b)A utility shall do all of the following:(1)Post on its internet website a comprehensive checklist of items that the applicant is required to submit to the utility for the application to be deemed complete.(2)Provide an option for the applicant to engage with staff for preapplication project review.(3)Provide upfront estimates of costs for the applicants planning purposes that include estimates of all related fees, charges, and potential upgrades to infrastructure or increases of electricity to the property that may be needed for energization, if applicable.(c)A utility shall allow an application to be submitted at the same time an applicant applies for a building permit for the local agency with jurisdiction over the accessory dwelling unit or junior accessory dwelling unit.(d)(1)Not later than 15 business days after a utility received an application, the utility shall determine whether the application is complete and provide written notice of its determination to the applicant.(2)If the utility determines that the applicant is incomplete, the utility shall, as a part of the notice provided under paragraph (1), provide the applicant with a list of deficiencies that renders the application incomplete and a description of how the applicant can cure those deficiencies.(3)(A)Upon the receipt of a notice that an application is incomplete, the applicant may remedy the deficiencies specified in the notice by submitting additional information.(B)Within 15 business days of receiving the additional information, the utility shall determine whether the submission has remedied the deficiencies specified in the notice and whether the application is complete. The utility shall not deem an application to be incomplete for any deficiency that was not specified in the notice. If the utility determines that the submission is insufficient to remedy the deficiencies specified in the notice and that the application remains incomplete, the utility shall notify the applicant of its right to submit, in writing, a complaint pursuant to subdivision (h).(e)A utility shall not cancel an application without the applicants consent.(f)(1)For an application for an electrical service connection, within 15 business days of determining an application is complete, the utility providing electrical service shall make a load assessment for the accessory dwelling unit or junior accessory dwelling unit and inform the applicant whether a new electrical panel or electrical meter is required to provide the electrical service connection. If a new electrical panel or electrical meter is required, the electrical corporation shall also provide to the applicant comprehensive specifications for the new electrical panel or electrical meter.(2)Within 10 business days of a notification that the new electrical panel or electrical meter has been installed, the utility shall verify that the installation is completed.(g)(1)Within 30 days of a notification that the construction of an accessory dwelling unit or junior accessory dwelling unit is complete, the utility shall complete the service connection to the accessory dwelling unit or junior accessory dwelling unit if the application has been deemed complete and, if applicable, the installation of the new electrical panel or electrical meter is verified to be completed.(2)The 30-day period may be extended if the applicant requests a delay in completing the service connection and shall be extended by the amount of time requested.(3)The 30-day period may be extended by the utility only if the accessory dwelling unit or junior accessory dwelling unit is not ready for the service connection.(h)If a utility fails to comply with this section, an applicant may submit, in writing, to the commission, a complaint alleging a violation of this section.(i)The commission shall keep a record of all complaints filed pursuant to subdivision (h) and shall annually publish a report with that aggregated record.(j)The commission shall give notice to a utility of a complaint filed by an applicant pursuant to this section and give the utility an opportunity to address the complaint.(k)(1)If the commission determines a utility has violated this section, the commission shall assess a civil penalty of up to ten thousand dollars ($10,000) for each day that the violation occurred.(2)In addition to paragraph (1), the commission shall annually assess a civil penalty on a utility based on percentage of the number of complaints filed pursuant to subdivision (h) for which the commission finds that a violation of this section has occurred as compared to the total number of applications filed with the utility for that calendar year. A civil penalty in the amount of up to one million dollars ($1,000,000) shall be assessed if the percentage is between 5 and 10 percent. A civil penalty of up to two million dollars ($2,000,000) shall be assessed if the percentage is more than 10 percent.SEC. 5.The Legislature finds and declares that Section 1 of this act amending Section 66311.5 of the Government Code addresses a matter of statewide concern rather than a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 1 of this act applies to all cities, including charter cities.SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.(a)Fees charged for the construction of accessory dwelling units or junior accessory dwelling units shall be determined in accordance with Chapter 5 (commencing with Section 66000) and Chapter 7 (commencing with Section 66012).
(b)An accessory dwelling unit or junior accessory dwelling unit shall not be considered by a local agency, special district, or water corporation to be a new residential use for purposes of calculating connection fees or capacity charges for utilities, including water and sewer service, unless the unit was constructed with a new single-family dwelling.
(c)(1)A local agency, special district, or water corporation shall not impose any impact fee upon the development of an accessory dwelling unit that has 750 square feet of interior livable space or less or a junior accessory dwelling unit that has 500 square feet of interior livable space or less. Any impact fees charged for an accessory dwelling unit that has more than 750 square feet of interior livable space shall be charged proportionately in relation to the square footage of the primary dwelling unit.
(2)For purposes of this subdivision, impact fee has the same meaning as the term fee is defined in subdivision (b) of Section 66000, except that it also includes fees specified in Section 66477. Impact fee does not include any connection fee or capacity charge charged by a local agency, special district, or water corporation.
(3)For the purposes of this section and Section 17620 of the Education Code, an accessory dwelling unit or junior accessory dwelling unit that contains less than 500 square feet of interior livable space shall, for the purpose of subparagraph (C) of paragraph (1) of subdivision (a) of Section 17620 of the Education Code, be considered other residential construction that does not increase assessable space by 500 square feet.
(d)For an accessory dwelling unit or a junior accessory dwelling unit described in paragraph (1) of subdivision (a) of Section 66323, a local agency, special district, or water corporation shall not require the applicant to install a new or separate utility connection directly between the unit and the utility or impose a related connection fee or capacity charge, unless the unit was constructed with a new single-family dwelling, or upon separate conveyance of the accessory dwelling unit pursuant to Section 66342.
(e)For an accessory dwelling unit that is not described in paragraph (1) of subdivision (a) of Section 66323, a local agency, special district, or water corporation may require a new or separate utility connection directly between the accessory dwelling unit and the utility. Consistent with Section 66013, the connection may be subject to a connection fee or capacity charge that shall be proportionate to the burden of the proposed accessory dwelling unit, based upon either its square feet or the number of its drainage fixture unit (DFU) values, as defined in the Uniform Plumbing Code adopted and published by the International Association of Plumbing and Mechanical Officials, upon the water or sewer system. This fee or charge shall not exceed the reasonable cost of providing this service.
(f)A local agency shall post on its internet website or distribute in written form to an applicant a comprehensive list of requirements for utility service connections that may be required for an accessory dwelling unit or junior accessory dwelling unit and contact information for each of the utilities that provide service in the jurisdiction.
SEC. 2.The heading of Chapter 9 (commencing with Section 8400) of Division 4.1 of the Public Utilities Code is amended to read:9.Electrical, Gas, Sewer, and Water Service for New Housing ConstructionSEC. 3.Section 8400 of the Public Utilities Code is amended to read:8400.As used in this chapter, utility all of the following definitions apply:
(a)Accessory dwelling unit has the same meaning as set forth in Section 66313 of the Government Code.
(b)Junior accessory dwelling unit has the same meaning as set forth in Section 66313 of the Government Code.
(c)Utility means any of the following that furnish electrical, gas, water, or sewer service, or any a combination thereof, of those services, where the service is performed for, or the commodity is delivered to, the public or any a portion thereof: of the public:
(a)(1)An electrical corporation, as defined in Section 218.
(b)(2)A gas corporation, as defined in Section 222.
(c)(3)A sewer system corporation, as defined in Section 230.6.
(d)(4)A water corporation, as defined in Section 241.
(e)(5)A municipality or municipal corporation operating as a public utility pursuant to Division 5 (commencing with Section 10001).
(f)(6)A municipal utility district formed pursuant to the Municipal Utility District Act (Division 6 (commencing with Section 11501)).
(g)(7)A public utility district formed pursuant to The Public Utility District Act (Division 7 (commencing with Section 15501)).
(h)(8)An irrigation district formed pursuant to the Irrigation District Law (Division 11 (commencing with Section 20500) of the Water Code).
(i)(9)A joint powers authority that includes one or more of the entities described in subdivisions (e) to (h), inclusive, and that owns electrical, gas, water, or sewer facilities, or furnishes electrical, gas, water, or sewer service over its own or its members system.
SEC. 4.Section 8402 is added to the Public Utilities Code, to read:8402.(a)For purposes of this section, both of the following definitions apply:
(1)Applicant means a person or entity submitting an application.
(2)Application means an application for obtaining a service connection to an accessory dwelling unit or junior accessory dwelling units.
(b)A utility shall do all of the following:
(1)Post on its internet website a comprehensive checklist of items that the applicant is required to submit to the utility for the application to be deemed complete.
(2)Provide an option for the applicant to engage with staff for preapplication project review.
(3)Provide upfront estimates of costs for the applicants planning purposes that include estimates of all related fees, charges, and potential upgrades to infrastructure or increases of electricity to the property that may be needed for energization, if applicable.
(c)A utility shall allow an application to be submitted at the same time an applicant applies for a building permit for the local agency with jurisdiction over the accessory dwelling unit or junior accessory dwelling unit.
(d)(1)Not later than 15 business days after a utility received an application, the utility shall determine whether the application is complete and provide written notice of its determination to the applicant.
(2)If the utility determines that the applicant is incomplete, the utility shall, as a part of the notice provided under paragraph (1), provide the applicant with a list of deficiencies that renders the application incomplete and a description of how the applicant can cure those deficiencies.
(3)(A)Upon the receipt of a notice that an application is incomplete, the applicant may remedy the deficiencies specified in the notice by submitting additional information.
(B)Within 15 business days of receiving the additional information, the utility shall determine whether the submission has remedied the deficiencies specified in the notice and whether the application is complete. The utility shall not deem an application to be incomplete for any deficiency that was not specified in the notice. If the utility determines that the submission is insufficient to remedy the deficiencies specified in the notice and that the application remains incomplete, the utility shall notify the applicant of its right to submit, in writing, a complaint pursuant to subdivision (h).
(e)A utility shall not cancel an application without the applicants consent.
(f)(1)For an application for an electrical service connection, within 15 business days of determining an application is complete, the utility providing electrical service shall make a load assessment for the accessory dwelling unit or junior accessory dwelling unit and inform the applicant whether a new electrical panel or electrical meter is required to provide the electrical service connection. If a new electrical panel or electrical meter is required, the electrical corporation shall also provide to the applicant comprehensive specifications for the new electrical panel or electrical meter.
(2)Within 10 business days of a notification that the new electrical panel or electrical meter has been installed, the utility shall verify that the installation is completed.
(g)(1)Within 30 days of a notification that the construction of an accessory dwelling unit or junior accessory dwelling unit is complete, the utility shall complete the service connection to the accessory dwelling unit or junior accessory dwelling unit if the application has been deemed complete and, if applicable, the installation of the new electrical panel or electrical meter is verified to be completed.
(2)The 30-day period may be extended if the applicant requests a delay in completing the service connection and shall be extended by the amount of time requested.
(3)The 30-day period may be extended by the utility only if the accessory dwelling unit or junior accessory dwelling unit is not ready for the service connection.
(h)If a utility fails to comply with this section, an applicant may submit, in writing, to the commission, a complaint alleging a violation of this section.
(i)The commission shall keep a record of all complaints filed pursuant to subdivision (h) and shall annually publish a report with that aggregated record.
(j)The commission shall give notice to a utility of a complaint filed by an applicant pursuant to this section and give the utility an opportunity to address the complaint.
(k)(1)If the commission determines a utility has violated this section, the commission shall assess a civil penalty of up to ten thousand dollars ($10,000) for each day that the violation occurred.
(2)In addition to paragraph (1), the commission shall annually assess a civil penalty on a utility based on percentage of the number of complaints filed pursuant to subdivision (h) for which the commission finds that a violation of this section has occurred as compared to the total number of applications filed with the utility for that calendar year. A civil penalty in the amount of up to one million dollars ($1,000,000) shall be assessed if the percentage is between 5 and 10 percent. A civil penalty of up to two million dollars ($2,000,000) shall be assessed if the percentage is more than 10 percent.
SEC. 5.The Legislature finds and declares that Section 1 of this act amending Section 66311.5 of the Government Code addresses a matter of statewide concern rather than a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 1 of this act applies to all cities, including charter cities.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Section 66313 of the Government Code is amended to read:66313.For purposes of this chapter:(a)Accessory dwelling unit means an attached or a detached residential dwelling unit that provides complete independent living facilities for one or more persons and is located on a lot with a proposed or existing primary residence. It shall include permanent provisions for living, sleeping, eating, cooking, and sanitation on the same parcel as the single-family or multifamily dwelling is or will be situated. An accessory dwelling unit also includes the following:(1)An efficiency unit.(2)A manufactured home, as defined in Section 18007 of the Health and Safety Code.(b)Accessory structure means a structure that is accessory and incidental to a dwelling located on the same lot.(c)Efficiency unit has the same meaning as defined in Section 17958.1 of the Health and Safety Code.(d)Junior accessory dwelling unit means a unit that is no more than 500 square feet of interior livable space in size and contained entirely within a single-family residence. A junior accessory dwelling unit may include separate sanitation facilities, or may share sanitation facilities with the existing structure.(e)Livable space means a space in a dwelling intended for human habitation, including living, sleeping, eating, cooking, or sanitation.(f)Living area means the interior habitable area of a dwelling unit, including basements and attics, but does not include a garage or any accessory structure.(g)Local agency means a city, county, or city and county, whether general law or chartered.(h)Nonconforming zoning condition means a physical improvement on a property that does not conform to current zoning standards.(i)Objective standards means standards that involve no personal or subjective judgment by a public official and are uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official before submittal.(j)Passageway means a pathway that is unobstructed clear to the sky and extends from a street to one entrance of the accessory dwelling unit.(k)Permitting agency means any entity that is involved in the review of a permit for an accessory dwelling unit or junior accessory dwelling unit and for which there is no substitute, including, but not limited to, applicable planning departments, building departments, utilities, and special districts.(l)Proposed dwelling means a dwelling that is the subject of a permit application and that meets the requirements for permitting.(m)Public transit means a location, including, but not limited to, a bus stop or train station, where the public may access buses, trains, subways, and other forms of transportation that charge set fares, run on fixed routes, and are available to the public.(n)Tandem parking means that two or more automobiles are parked on a driveway or in any other location on a lot, lined up behind one another.For purposes of this chapter:
(a)Accessory dwelling unit means an attached or a detached residential dwelling unit that provides complete independent living facilities for one or more persons and is located on a lot with a proposed or existing primary residence. It shall include permanent provisions for living, sleeping, eating, cooking, and sanitation on the same parcel as the single-family or multifamily dwelling is or will be situated. An accessory dwelling unit also includes the following:
(1)An efficiency unit.
(2)A manufactured home, as defined in Section 18007 of the Health and Safety Code.
(b)Accessory structure means a structure that is accessory and incidental to a dwelling located on the same lot.
(c)Efficiency unit has the same meaning as defined in Section 17958.1 of the Health and Safety Code.
(d)Junior accessory dwelling unit means a unit that is no more than 500 square feet of interior livable space in size and contained entirely within a single-family residence. A junior accessory dwelling unit may include separate sanitation facilities, or may share sanitation facilities with the existing structure.
(e)Livable space means a space in a dwelling intended for human habitation, including living, sleeping, eating, cooking, or sanitation.
(f)Living area means the interior habitable area of a dwelling unit, including basements and attics, but does not include a garage or any accessory structure.
(g)Local agency means a city, county, or city and county, whether general law or chartered.
(h)Nonconforming zoning condition means a physical improvement on a property that does not conform to current zoning standards.
(i)Objective standards means standards that involve no personal or subjective judgment by a public official and are uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official prior to before submittal.
(j)Passageway means a pathway that is unobstructed clear to the sky and extends from a street to one entrance of the accessory dwelling unit.
(k)Permitting agency means any entity that is involved in the review of a permit for an accessory dwelling unit or junior accessory dwelling unit and for which there is no substitute, including, but not limited to, applicable planning departments, building departments, utilities, and special districts.
(l)Proposed dwelling means a dwelling that is the subject of a permit application and that meets the requirements for permitting.
(m)Public transit means a location, including, but not limited to, a bus stop or train station, where the public may access buses, trains, subways, and other forms of transportation that charge set fares, run on fixed routes, and are available to the public.
(n)Tandem parking means that two or more automobiles are parked on a driveway or in any other location on a lot, lined up behind one another.
|
Date
|
Status
|
|---|---|
| Sep 27, 2026 | Chaptered by Secretary of State. Chapter 684, Statutes of 2026. |
| Sep 27, 2026 | Approved by the Governor. |
| Aug 21, 2026 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 18, 2026 | Assembly amendments concurred in. (Ayes 30. Noes 10. Page 5516.) Ordered to engrossing and enrolling. |
| Aug 18, 2026 | Assembly amendments concurred in. (Ayes 30. Noes 10.) Ordered to engrossing and enrolling. |
| Aug 18, 2026 | Assembly amendments concurred in. (Ayes 29. Noes 10.) Ordered to engrossing and enrolling. |
| Aug 18, 2026 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 17, 2026 | Read third time. Passed. (Ayes 56. Noes 8. Page 6212.) Ordered to the Senate. |
| Aug 17, 2026 | Read third time. Passed. Ordered to the Senate. |
| Aug 6, 2026 | Read second time. Ordered to third reading. |
| Aug 5, 2026 | From committee: Do pass. (Ayes 13. Noes 2.) (August 5). |
| Jun 29, 2026 | Read second time and amended. Re-referred to Com. on APPR. |
| Jun 25, 2026 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 17. Noes 0.) (June 24). |
| Jun 10, 2026 | June 10 hearing postponed by committee. |
| Jun 1, 2026 | Referred to Com. on U. & E. |
| May 20, 2026 | In Assembly. Read first time. Held at Desk. |
| May 19, 2026 | Read third time. Passed. (Ayes 29. Noes 5. Page 4347.) Ordered to the Assembly. |
| May 19, 2026 | Read third time. Passed. (Ayes 29. Noes 5.) Ordered to the Assembly. |
| May 14, 2026 | From committee: Do pass. (Ayes 5. Noes 2. Page 4268.) (May 14). |
| May 14, 2026 | Read second time. Ordered to third reading. |
| May 14, 2026 | From committee: Do pass. (Ayes 5. Noes 2.) (May 14). |
| May 8, 2026 | Set for hearing May 14. |
| May 4, 2026 | May 4 hearing: Placed on APPR. suspense file. |
| Apr 24, 2026 | Set for hearing May 4. |
| Apr 21, 2026 | Re-referred to Com. on APPR. |
| Apr 21, 2026 | Withdrawn from committee. |
| Apr 20, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on L. GOV. |
| Apr 14, 2026 | From committee: Do pass and re-refer to Com. on L. GOV. (Ayes 14. Noes 2. Page 3842.) (April 13). Re-referred to Com. on L. GOV. |
| Apr 14, 2026 | From committee: Do pass and re-refer to Com. on L. GOV. (Ayes 14. Noes 2.) (April 13). Re-referred to Com. on L. GOV. |
| Apr 9, 2026 | Set for hearing April 13. |
| Apr 8, 2026 | Re-referred to Coms. on E., U & C. and L. GOV. |
| Mar 23, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Mar 4, 2026 | Referred to Com. on RLS. |
| Feb 20, 2026 | From printer. May be acted upon on or after March 22. |
| Feb 19, 2026 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 18, 2026 | Unfinished Business SB1196 McNerney et al. Concurrence | Senate Floor |
Passed |
|
| Aug 17, 2026 | SB 1196 McNerney Senate Third Reading By Kalra | Assembly Floor |
Passed |
|
| Aug 5, 2026 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jun 24, 2026 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Energy |
Passed |
|
| May 19, 2026 | Senate 3rd Reading SB1196 McNerney et al. | Senate Floor |
Passed |
|
| May 14, 2026 | Do pass | Senate Standing Committee on Appropriations |
Passed |
|
| May 4, 2026 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 13, 2026 | Do pass, but first be re-referred to the Committee on [Local Government] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| ADU West Coast | ** Support | |
| Bequall | ** Support | |
| California Solar & Storage Association | ** Support | |
| California YIMBY | ** Support | |
| Casita Coalition | ** Support | |
| Hello Housing | ** Support | |
| Housing Action Coalition | ** Support | |
| Inspired ADUs | ** Support | |
| Pacific Gas And Electric Company | ** Against | |
| San Diego Gas & Electric | ** Against | |
| SnapADU | ** Support | |
| Southern California Edison | ** Against | |
| Southern California Obtainable Housing | ** Support | |
| Tentmakers INC | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 1196 |
UNFINISHED BUSINESS
Bill No: SB 1196
Author: McNerney (D) and Wahab (D)
Amended: 6/29/26
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 14-2, 4/13/26
AYES: Allen, Archuleta, Arreguín, Becker, Caballero, Gonzalez, Grove, Hurtado, McNerney, Reyes, Richardson, Rubio, Stern, Wahab
NOES: Dahle, Strickland
NO VOTE RECORDED: Ochoa Bogh
SENATE APPROPRIATIONS COMMITTEE: 5-2, 5/14/26
AYES: Cervantes, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto, Dahle
SENATE FLOOR: 29-5, 5/19/26
AYES: Allen, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Cortese, Durazo, Gonzalez, Grayson, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Padilla, Pérez, Reyes, Richardson, Rubio, Smallwood-Cuevas, Umberg, Wahab, Weber Pierson, Wiener
NOES: Alvarado-Gil, Dahle, Jones, Seyarto, Strickland
NO VOTE RECORDED: Choi, Grove, Niello, Ochoa Bogh, Stern, Valladares
ASSEMBLY FLOOR: 56-8, 8/17/26 - See last page for vote
SUBJECT: Small energization projects: electrical service connections
SOURCE: Author
DIGEST:
- This bill requires the California Public Utilities Commission (CPUC), by September 30, 2027, to establish timelines for electrical corporations to respond to, and process requests to, energize small energization projects (including certain accessory dwelling units).
Assembly Amendments
of 6/29/26 replace the references to “accessory dwelling units (ADUs)” and “junior ADUs” with “small energization projects”; remove specific requirements on the CPUC to establish times by when the electrical corporation must respond to connecting ADUs specifically; and make additional clarifying changes.
ANALYSIS:
Existing law:
- Establishes and vests the CPUC with regulatory authority over public utilities, including electrical corporations. (Article 12 of the California Constitution)
- Defines an “electrical corporation” to include every corporation or person owning, controlling, operating, or managing any electric plant for compensation within this state, except where electricity is generated on or distributed by the producer through private property solely for its own use or the use of its tenants and not for sale or transmission to others. (Public Utilities Code §218)
- Prohibits a public utility from making or granting any preference or advantage to any corporation or person or subject any corporation or person to any prejudice or disadvantage as to rates, charges, service, facilities, or in any other respect. (Public Utilities Code §453)
- Requires the CPUC to enforce rules governing the extension of service by electrical corporations. (Public Utilities Code §783)
- Establishes the Powering Up Californians Act and requires the CPUC to determine the criteria for timely service for electrical customers to be energized, including categories of timely electric service through energization, as specified. (Public Utilities Code §930 et seq.)
- Establishes the policy of the state that each electrical corporation promptly energize new customers, including by ensuring that new housing, new businesses, new electric equipment in buildings, and new charging for light-duty, medium-duty, and heavy-duty vehicles and off-road vehicles, vessels, trains, and equipment can be used without delay caused by a failure of the electrical corporation to implement energization projects. (Public Utilities Code §933)
- Requires the CPUC to determine the criteria for timely service for electric customers to be energized. (Public Utilities Code §933.5)
- Requires the CPUC, by September 30, 2024, to establish reasonable average and maximum target energization time periods. Requires the targets ensure that work is completed in a manner that minimizes delay in meeting the date requested by the customer to the greatest extent possible. Requires procedures for customers to report energization delays to the CPUC and for electrical corporations to annually report on their performance. (Public Utilities Code §934)
This bill:
- Defines “small energization projects” to include an energization project that does not require distribution or service line extensions and whose only upgrade is a new electric meter required by an electrical corporation or local jurisdiction. Provides that a small energization project does not require distribution or service line extensions or upgrades under the line extension framework adopted by the CPUC pursuant to Public Utilities Code §783 and implemented in the Electric Rule 15 tariff or Electric Rule 16 tariff, or any successor or substantially similar tariffs adopted by the CPUC governing distribution or service line extensions or upgrades by an electrical corporation.
- Requires the CPUC, by September 30, 2027, in a new or existing proceeding, to establish timelines for electrical corporations to respond to and process requests to energize small energization projects.
- Requires the CPUC in establishing the timelines for energization, to require electrical corporations to comply with certain requirements.
Background
Connecting to the electric and gas distribution grid. Rules governing the ability of new buildings and generation and storage resources to connect to the electric and gas distribution grid are generally determined by statute, CPUC rules, and tariffs, (i.e., documents that specify rates, charges, rules, and conditions under which an electrical corporation will provide services to the public) for each of the electrical corporations. New service connections refer to extending an electricity or expanding distribution infrastructure to service new or expanded customer load, known as “energization.” Electric Tariff Rules 15 and 16 establish the guidelines for design, cost allocation, and responsibilities of a project applicant and a utility for electric distribution line extensions. The ability to connect to the larger electrical system can take months (if not, years, in some cases) as the process can entail the need for designs, assessments on cost allocations associated with improvements on the electric distribution system to allow for the connection, and other issues. In the case of new building developments, depending on the size of the development, the need for electric service extensions may be needed in phases over months, or years.
Energization target time periods. SB 410 (Becker, Chapter 394, Statutes of 2023), the Powering Up Californians Act, required the CPUC to establish by September 30, 2024, reasonable average and maximum target energization time periods in order to connect new customers and upgrade the service of existing customers to the electrical grid. This bill also required reporting by electrical corporations and authorized specified annual cost-recovery, subject to a cap. AB 50 (Wood, Chapter 317, Statutes of 2023) required the CPUC to determine the criteria for timely service for electric customers to be energized. In CPUC proceeding (R. 24-01-018) the CPUC adopted a decision in September 2024 (D. 24-09-020) which established timelines for energization requests and a procedure for customers to report energization delays to the CPUC. The table below notes the new targets and timelines adopted by the CPUC.
Energization Type | Average Energization Target (calendar days) | Maximum Energization Target (calendar days) |
Rule 15 | 182 | 357 |
Rule 16 | 182 | 335 |
Rule 15/16 combined | 182 | 306 |
Application Decision | 10 | 45 |
Main panel upgrade | 30 | 45 |
Comments
Need for this bill. The author states:
California homeowners and ADU builders are increasingly frustrated by long delays – up to a year – to obtain utility service connections. The problem is, there are no clear rules for when a utility must hook up an ADU – and no consequences for delays. SB 1196 would make sure that when a homeowner adds an ADU, they’ll be able to get it hooked up without waiting months on end.
This bill requires the CPUC to require timelines of electric IOUs to respond to and process requests for energization of small energization projects. The author’s office has shared their primary concern is the pace of connections within the service territory of the IOUs for ADUs. The backlog for energization has been an issue the Legislature has taken action to address with the passage of SB 410 and AB 50 among others. The CPUC initiated Rulemaking R.24‑01‑018 to define utility‑controlled steps, adopt average and maximum timelines, and implement standardized reporting and enforcement mechanisms. Under CPUC Rulemaking 24‑01‑018, utilities must provide written approval or rejection of applications within an average of 10 calendar days and no more than 45 calendar days. Southern California Edison contends this bill undermines the existing CPUC rulemaking process, including introducing duplicative measures. They argue that requiring utilities to revisit established progress is unnecessary and risks diverting resources from continued implementation and improvement efforts already directed by the CPUC.
Related/Prior Legislation
SB 1210 (Skinner, Chapter 728, Statutes of 2024) required electrical, gas, sewer, and water service utilities, with exceptions, to post estimated fees and timeframes for new service connections needed to connect new housing construction projects.
AB 50 (Wood, Chapter 317, Statutes of 2023) required the CPUC, by July 1, 2025, to determine the criteria for customers to receive timely electricity service when requesting new service connections or upgraded service, known as “energization.”
SB 410 (Becker, Chapter 394, Statutes of 2023) required the CPUC to establish by September 30, 2024, reasonable average and maximum target energization time periods in order to connect new customers and upgrade the service of existing customers to the electrical grid.
AB 1026 (Wood, Chapter 446, Statutes of 2019) required an electrical or gas corporation to apply only those construction and design specifications, standards, terms, and conditions that are applicable to a new extension of service project for the 18 months following the date the application for a new extension of service project is approved.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee, while the bill makes explicit requirements of the CPUC, the CPUC nonetheless asserts it can accommodate any work created by this bill in an existing proceeding in which the CPUC is establishing reasonable average and maximum target energization time periods and a procedure for customers to report energization delays.
SUPPORT: (Verified 8/17/26)
Bequall
California Solar & Storage Association
California Yimby
Casita Coalition
Housing Action Coalition
OPPOSITION: (Verified 8/17/26)
Pacific Gas and Electric Company
San Diego Gas & Electric
Southern California Edison
ARGUMENTS IN SUPPORT: According to California YIMBY:
California has enacted numerous laws to accelerate the creation of ADUs, and today, ADUs comprise the fastest-growing sector of the housing market. However, homeowners and ADU builders are increasingly frustrated by long delays in obtaining utility service connections. In some cases, applicants have been forced to wait up to a year, placing an undue financial burden on property owners and SB 1196 will streamline ADU construction by creating clear timelines for utility service connections; allowing applicants to submit a request for a utility hookup at the same time they request a building permit; barring utilities from canceling a service for utilities that fail to provide timely hookups.
ARGUMENTS IN OPPOSITION: According to Southern California Edison:
SB 1196 undermines the critical work taking place in the Establishing Energization Timeline Order Instituting Rulemaking (Energization OIR) established by AB 50 (Wood) and SB 410 (Becker). This bill presents duplicative measures that fail to recognize the progress that utilities have made to improve the energization process. In Phase 1 of the Energization OIR, the California Public Utilities Commission (CPUC) established a reasonable framework based on an electrical corporation’s historical timelines and set new targets to reduce energization delays. …SB 1196 creates a preferential carve‑out … the bill risks unintended consequences by elevating this project type above other customers, contrary to Public Utilities Code § 453, which prohibits preferential treatment in the provision of utility services.
ASSEMBLY FLOOR: 56-8, 8/17/26
AYES: Addis, Aguiar-Curry, Ahrens, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Calderon, Caloza, Carrillo, Connolly, Davies, Elhawary, Fong, Gabriel, Garcia, Gipson, Mark González, Haney, Harabedian, Hoover, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Pellerin, Petrie-Norris, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ta, Wallis, Ward, Wilson, Zbur, Rivas
NOES: DeMaio, Dixon, Ellis, Hadwick, Johnson, Macedo, Sanchez, Tangipa
NO VOTE RECORDED: Alanis, Alvarez, Bonta, Bryan, Castillo, Chen, Flora, Jeff Gonzalez, Hart, Lackey, Patterson, Quirk-Silva, Ramos, Valencia, Wicks
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
8/17/26 15:41:32
**** END ****
SENATE THIRD READING
STR Bill Id:SB 1196
Author:(McNerney and Wahab)
As Amended Ver:June 29, 2026
Majority vote
SUMMARY
Requires the California Public Utilities Commission (CPUC), by September 30, 2027, in a new or existing proceeding, to establish timelines for electrical corporations to respond to and process requests to energize a project that does not require distribution or service line extensions or upgrades, other than a new electric meter, which the bill defines as a "small energization project."
Major Provisions
- In establishing the above timelines, the CPUC shall include, at a minimum, all of the following:
- Establish the times by which an application received by an electrical corporation shall be determined to be complete and by which the determination is to be communicated to the applicant.
- Require an electrical corporation, in response to an individual application, to provide a list of deficiencies for an application determined to be incomplete and an explanation of how the applicant may remedy the deficiencies.
- Determine the penalties that shall be assessed on an electrical corporation for failing to comply with the timelines established by the CPUC.
- In establishing the timelines, the CPUC may consider a modification to shorten the timelines as established in this bill.
- In establishing timelines for energization of small energization projects, the CPUC shall require at a minimum, electrical corporations to comply with all of the following:
- Allow an application for energization to be submitted with the electrical corporation at the same time an applicant applies for a building permit with the local permitting agency.
- Not cancel an application for energization without the applicant's consent, unless the applicant fails to respond to the electrical corporation within a timeline established by the CPUC.
- Provide the applicant with an option to engage with electrical corporation staff for preapplication project review.
- Provide the applicant with the electrical corporation's estimates of costs for the completed application.
- Requires an electrical corporation's compliance with this bill to complement, and not conflict with, any rule, order, or determination of the CPUC pursuant to this article.
- Defines a "small energization project" to include an energization project that does not require distribution or service line extensions and whose only upgrade is a new electric meter required by an electric corporation or local jurisdiction.
COMMENTS
Energization is the process of connecting a customer to the electric distribution system so electric service can begin. The process is generally governed by the CPUC's Electric Tariff Rules 15 and 16, which address distribution and service line extensions. Depending on the size and complexity of a project, energization may involve engineering reviews, construction, cost allocation, and distribution system upgrades, with timelines ranging from several weeks to multiple years.
Demand for new electric service connections has grown as the state builds more housing, electrifies buildings and transportation, and adds new clean energy resources. At the same time, delays in the energization process have become a growing concern because they can slow housing development, business expansion, and other projects that depend on electric service. In response, the Legislature enacted SB 410 (Becker), Chapter 394, Statutes of 2023 and AB 50 (Wood), Chapter 317, Statutes of 2023, directing the CPUC to establish target energization timelines, improve transparency, require utility reporting, and create a process for customers to report delays.
The CPUC implemented these measures through Decision 24-09-020, adopted in September 2024. The decision established average and maximum target timelines for different categories of service requests and requires investor-owned utilities to report their performance, explain delays, and develop corrective strategies when they fail to meet the targets. It also requires utilities to assign a dedicated project manager, provide customers with regular status updates, and allows customers to report energization delays directly to the CPUC. More recently, SB 254 (Becker), Chapter 119, Statutes of 2025 required the CPUC to establish an enforcement policy, including penalties for noncompliance with the adopted energization targets, by January 1, 2027.
According to the Author
According to the author, "California homeowners and Accessory Dwelling Unit (ADU) builders are increasingly frustrated by long delays – up to a year – to obtain utility service connections. The problem is, there are no clear rules for when a utility must hook up an ADU – and no consequences for delays. SB 1196 would make sure that when a homeowner adds an ADU, they'll be able to get it hooked up without waiting months on end."
Arguments in Support
SB 1196 is supported by the Housing Action Coalition and other housing advocates, who argue that delays in utility connections increase costs and slow housing production. To address these concerns, this bill would establish timelines for utility processing, allow service requests to be submitted when building permit applications are filed, limit application cancellations, and authorize penalties for utilities that fail to meet the required timelines.
Arguments in Opposition
Southern California Edison opposes this bill, arguing that it would undermine the ongoing rulemaking established pursuant to AB 50 (Wood) and SB 410 (Becker) to develop energization timelines. The utility contends that enacting statutory requirements before that process is complete could duplicate or conflict with reforms already underway.
FISCAL COMMENTS
According to the Assembly Committee on Appropriations, the CPUC reports that any workload resulting from this bill can be accommodated within an existing proceeding establishing reasonable average and maximum target energization timeframes and a process for customers to report energization delays.
VOTES
SENATE FLOOR: 29-5-6
YES: Allen, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Cortese, Durazo, Gonzalez, Grayson, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Padilla, Pérez, Reyes, Richardson, Rubio, Smallwood-Cuevas, Umberg, Wahab, Weber Pierson, Wiener
NO: Alvarado-Gil, Dahle, Jones, Seyarto, Strickland
ABS, ABST OR NV: Choi, Grove, Niello, Ochoa Bogh, Stern, Valladares
ASM UTILITIES AND ENERGY: 17-0-1
YES: Petrie-Norris, Patterson, Boerner, Calderon, Davies, Mark González, Harabedian, Hart, Irwin, Kalra, Papan, Rogers, Schiavo, Schultz, Ta, Wallis, Zbur
ABS, ABST OR NV: Chen
ASM APPROPRIATIONS: 13-2-0
YES: Wicks, Hoover, Arambula, Calderon, Caloza, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache, Ta
NO: Dixon, Tangipa
UPDATED
VERSION: June 29, 2026
CONSULTANT: Lina V. Malova / U. & E. / (916) 319-2083 FN: 0003379
Date of Hearing: August 5, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 1196
Author:(McNerney) – As Amended Ver:June 29, 2026
Policy Committee: | Utilities and Energy | Vote: | 17 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill requires the California Public Utilities Commission (CPUC) to establish timelines by which an electrical corporation is to respond to and process requests to energize a project that does not require distribution or service line extensions or upgrades other than a new electric meter, which the bill terms a “small energization project.”
FISCAL EFFECT:
While the bill makes explicit requirements of the CPUC, the CPUC nonetheless asserts it can accommodate any work created by this bill in an existing proceeding in which the CPUC is establishing reasonable average and maximum target energization time periods and a procedure for customers to report energization delays.
COMMENTS:
Energization, in the context of electrical utilities, refers to the process by which a customer is connected to the larger electrical grid. The grid is an informal and very imprecise term that refers, very generally, to the entire interconnected electricity delivery system. Generally, the utilities and their regulators divide the grid between the transmission system, which carries relatively large voltages of electricity across long distances, and the distribution system or systems, which branch from the transmission system to deliver relatively small voltages of electricity to end-use customers.
The CPUC established rules, known as tariffs, that govern each IOU’s extension of electric service to a customer that requests such energization. Specifically, CPUC Electric Rule 15 governs extensions of an IOU’s existing distribution line from the nearest permanent and available distribution facility to a commercial area or neighborhood, generally to serve many customers. CPUC Electric Rule 16, in contrast, governs extension of a service line, which is a line that connects the IOU’s distribution lines to an electric meter or a specific IOU customer.
In recent years, the Legislature has taken interest in the time it takes the IOUs to respond to and complete customer requests for energization. This is because, in large part, energization is key to furthering the state’s clean energy goals. To this end, the Legislature approved two measures— SB 410 (Becker), Chapter 394, Statutes of 2023, and AB 50 (Wood), Chapter 317, Statutes of 2023. The former directed the CPUC to establish average and maximum target energization time periods by September 30, 2024, and requires electrical corporations to report their performance, whereas the latter requires the CPUC to determine the criteria for timely energization service. Since passage of those bills, the CPUC has issued decisions to implement that include timeframes and reporting requirements.
Nonetheless, the author contends there needs to be, in law, additional requirements regarding requests to energize accessory dwelling units (ADUs). According to the author, “The problem is, there are no clear rules for when a utility must hook up an ADU – and no consequences for delays. SB 1196 would make sure that when a homeowner adds an ADU, they’ll be able to get it hooked up without waiting months on end.”
As amended in the prior committee, the bill applies not just to an energization request for an ADU but to any energization request that does not require distribution or service line extensions or upgrades, other than installation of an electric meter.
The bill continues to be supported by housing advocates and builders of ADUs. The bill had been opposed by the state’s largest electric IOU’s. Following the latest amendments, Pacific Gas and Electric removed its opposition, but Southern California Edison reasserted its opposition, writing the bill “undermines the critical work taking place in the Establishing Energization Timeline Order Instituting Rulemaking (Energization OIR) established by AB 50 (Wood) and SB 410 (Becker)” and that “Preemptive legislation risks undermining this balanced, evidence‑based approach and duplicating or conflicting with reforms already underway.”
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: June 24, 2026
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
SBPCA Bill Id:SB 1196
Author:(McNerney) – As Amended Ver:April 20, 2026
SENATE VOTE: 29-5
SUBJECT: Accessory dwelling units and junior accessory dwelling units: electrical service connections
SUMMARY: Requires the California Public Utilities Commission (CPUC), by September 30, 2027, in a new or existing proceeding, to establish timelines for electrical corporations to respond to and process requests to energize accessory dwelling units (ADUs) and junior accessory dwelling units (JADUs). Specifically, this bill:
- Defines an “accessory dwelling unit” as set forth in Section 66313 of the Government Code and defines “junior accessory dwelling unit” has the same meaning as set forth in Section 66313 of the Government Code.
- Requires the CPUC, by September 30, 2027, in a new or existing proceeding, to establish timelines for electrical corporations to respond to and process requests to energize ADUs and JADUs, as follows:
- Establish the times by which an application is to be determined complete and by which that determination is to be provided to the applicant.
- Require an electrical corporation to provide a list of deficiencies, and an explanation of how to cure them, for an application determined incomplete.
- Establish the time by which an electrical corporation must respond to a cured application.
- Establish the time by which an electrical corporation must complete a load assessment for an ADU or JADU and inform the applicant whether a new electrical panel or meter is required.
- Establish the time by which an electrical corporation must verify that installation of a required panel or meter is complete.
- Establish the time by which an electrical corporation must complete the service connection after notification that construction is complete.
- Establish a process for an applicant to file a complaint with the CPUC for a violation of these requirements.
- Determine the penalties to be assessed on an electrical corporation for failing to comply with the timelines.
- Requires the CPUC, in establishing the timelines for energization, to require electrical corporations to comply with all the following:
- Allow an energization application to be submitted at the same time the applicant applies for a building permit with the local permitting agency.
- Not cancel an energization application without the applicant’s consent.
- Provide the applicant the opportunity to extend the timeline if the applicant requests a delay in completing the service connection.
- Provide the applicant the option to engage with electrical corporation staff for a preapplication project review.
- Provide the applicant upfront cost estimates — including fees, charges, and potential infrastructure upgrades — for planning purposes.
EXISTING LAW:
- Establishes the CPUC and vests the agency with regulatory authority over public utilities, including telephone corporations. (Article 12 of the California Constitution)
- Requires the CPUC to require each electrical corporation to retain an independent third-party auditor to review the electrical corporation’s business practices and procedures for energizing new customers and how the electrical corporation is planning for demand growth, including new customer energizations, and to evaluate the electrical corporation’s current and future energization performance. (Public Utilities Code § 940)
- Requires the CPUC to require each electrical corporation to retain an independent third-party auditor to review the electrical corporation’s business practices and procedures for energizing new customers and how the electrical corporation is planning for demand growth, including new customer energizations. (Public Utilities Code § 940(a))
- Requires the independent third-party auditor to report to the CPUC on a biannual basis regarding the electrical corporation’s business practices and procedures for energizing new customers and how the electrical corporation is planning for demand growth, including new customer energizations. (Public Utilities Code § 940(c))
- Requires the CPUC to ensure that each electrical corporation has sufficient and timely recovery of costs, consistent with the findings and policies of the Powering Up Californians Act, including for energization projects. (Public Utilities Code § 936)
- Requires each electrical corporation to annually report to the CPUC on its energization performance, including progress toward meeting the targets established pursuant to Section 934. (Public Utilities Code § 935)
- Requires the CPUC, on or before September 30, 2024, to establish reasonable average and maximum target energization targets and a process for customers to report energization delays to the CPUC. (Public Utilities Code § 934(a))
- Requires the CPUC to periodically update the energization time periods and requirements established pursuant to this section to reflect changed circumstances, new information, and experience. (Public Utilities Code § 934(e))
- Requires the CPUC to establish annual reporting requirements for electrical corporations to report customer energization projects in order to evaluate each electrical corporation's compliance with timely electrical service obligations and requires all such reports to be made publicly available. (Public Utilities Code § 933.5)
- Authorizes CPUC to supervise and regulate every public utility in the state and do all things necessary and convenient in the exercise of such power and jurisdiction. (Public Utilities Code § 701)
- Requires each public utility to furnish and maintain adequate, efficient, just, and reasonable service, instrumentalities, equipment, and facilities, as are necessary to promote the safety, health, comfort, and convenience of its patrons, employees, and the public. (Public Utilities Code § 451)
- Prohibits a public utility from making or granting any preference or advantage to any corporation or person or subjecting any corporation or person to any prejudice or disadvantage, as to rates, charges, service, facilities, or in any other respect. (Public Utilities Code § 453)
FISCAL EFFECT: Unknown. According to the Senate Appropriations Committee, the bill is expected to have negligible state costs pursuant to Senate Rule 28.8.
BACKGROUND:
Electric Service Extensions – Electric service extensions are generally governed by Electric Tariff Rules 15 and 16. These establish the guidelines for the design of electric service extensions, allocation of associated costs, and the respective responsibilities of the utility and project applicant. Connecting a project to the electric distribution system can take months, and in some cases years, as the process may require engineering reviews, system upgrades, and determinations regarding the allocation of costs associated with distribution infrastructure improvements. For larger developments, electric service extensions may be constructed in phases over the course of months or years, depending on the size and scope of the project.
Electric Tariff Rule 15 relates to distribution line extensions. Specifically, new distribution facilities that are a continuation of, or branch from, the nearest available existing permanent distribution line to the point of connection of the last service. Rule 15 generally pertains to electric distribution grid equipment used by multiple customers, for example, a transformer serving multiple homes.
Electric Tariff Rule 16 relates to service line extensions. The overhead and underground primary or secondary facilities (including but not limited to utility-owned service facilities and applicant owned service facilities) extending from the point of connection at the distribution line to the service delivery point. Rule 16 generally pertains to network equipment used by just one customer.
Energization Lifecycle – The time required to energize a new customer connection depends on project characteristics and the condition and capacity of the distribution system. Energization processes vary by utility territory and project type, ranging from relatively simple upgrades, such as residential panel replacements, to more complex commercial or public facility projects. Timelines may be affected by the need for system upgrades and factors outside the utility's control, including supply chain delays, weather, permit approvals, and the timing of customer application materials. The process typically includes application review, engineering assessment, cost estimation, construction planning, and final inspection and service connection, and often requires coordination with local permitting authorities. Utilities frequently process multiple requests simultaneously, and some projects require distribution system upgrades or other infrastructure work that can extend timelines. For these reasons, energization may take from about a month to multiple years, depending on project scope and conditions.
As shown in Figure 1, there are many steps—and thus many opportunities for delay—in the customer energization lifecycle. The energization process spans seven sequential phases from pre-application through construction. Preliminary engineering and design alone may take 16 to 23 weeks.
Figure 1: Customer Project Lifecycle (for complex projects)[1]
Energization Delays – California’s clean energy and climate policies, including the expansion of renewable electricity, the electrification of buildings, and the transition to zero-emission transportation, are increasing demand for new electric service connections and upgrades to the distribution grid. At the same time, state efforts to accelerate housing production, driven by statutory requirements, depend on timely and reliable access to electric service.
Delays in energizing new customer connections and service upgrades can occur at multiple stages of the process and may extend project timelines beyond initial expectations.
Legislative Response to Energization Delays – To provide certainty around timelines for electric service connections and upgrades, the Legislature enacted SB 410 (Becker, Chapter 394, Statutes of 2023) and AB 50 (Wood, Chapter 317, Statutes of 2023). SB 410 requires the CPUC to establish average and maximum target energization time periods by September 30, 2024. It also requires electrical corporations to report on their performance in meeting those targets, including information on staffing levels and workforce projections. The CPUC is further required to establish a process for customers to report delays and to consider actions in response. AB 50 addresses related issues of transparency in the energization process. It requires the CPUC to define timely electric service, including establishing categories of service, setting target timeframes, and identifying exceptions for more complex projects. The measure also requires utilities to provide customers with information about the status of their service requests and expected timelines.
Together, these measures establish expectations for energization timelines and provide the CPUC with tools to monitor utility performance. However, they rely on target setting and reporting, rather than requiring compliance with fixed timelines for individual projects. The statutes also recognize that timelines may vary based on project characteristics, system conditions, and the need for upgrades, and leave implementation details to the CPUC to work through its regulatory proceedings.
CPUC Decision Implementing SB 410 (Becker) and AB 50 (Wood) – On September 12, 2024, the CPUC issued Decision 24-09-020 implementing SB 410 and AB 50. It sets both average and maximum timeframes for different categories of service requests and requires IOUs to track and report their performance against those timeframes. The decision established an eight-step energization process to identify which steps are within IOU control and which are within customer or third-party control. Steps 2, 4, 6, 7, and 8 are solely within the control of an IOU. IOUs must submit biannual energization reports to the CPUC, with the first report due March 31, 2025, and the second due September 30, 2025. Those reports must include average completion times, explanations for energization periods that exceed the maximum target, and an analysis of obstacles affecting energization. The IOUs are required to report compliance with the CPUC’s adopted energization targets in those biannual reports. When an IOU is out of compliance, it must provide a detailed strategy for meeting the adopted targets in the future. However, the CPUC may require the IOUs to take specific remedial actions based on reported non-compliance to achieve the mandated timelines.
The decision requires IOUs to assign a dedicated project manager within 10 business days of application approval to serve as a single point of contact. The project manager must provide monthly status updates and communicate with customers when delays arise, including the cause, responsible party, and estimated resolution timeframe. The decision also adopted an Energization Delay Reporting Form, which provides customers the ability to report energization delays directly to the CPUC’s Energy Division. Upon receipt, the Energy Division contacts both the customer and the IOU to request additional information and works with both parties to resolve the delay in a timely manner. In February 2026, the CPUC issued an additional decision in the proceeding addressing flexible service connections for distribution customers facing capacity constraints. The CPUC is developing a record in Phase 2 on existing enforcement policies and associated penalties. SB 254 (Becker, Chapter 119, Statutes of 2025) requires the CPUC, on or before January 1, 2027, to establish an enforcement policy for the energization targets established by the decision, including penalties for non-compliance with remedial actions.
The Customer Energization
Map – Figure 1: (Titled New Project Customer Process): Figure 1 outlines the sequence of actions that a customer (e.g., a project developer) and an IOU — PG&E, in this case, must take to establish electric service for new construction projects. The process has six phases:
1)Application intake,
2) Engineering and design
3)Dependencies
4)Site readiness
5) Construction
6) Service energization.
The process begins when the customer submits project details and pays any upfront engineering fees. PG&E contacts the customer within 3 business days to verify documents. This application and intake phase must be completed within 66 calendar days of application submission. PG&E then reviews requirements, finalizes the engineering design, and sends construction documents and a contract to the customer. The customer signs and pays for the contract within 90 days. PG&E then confirms all required clearances, including environmental approvals. PG&E then schedules a pre-construction meeting and provides the customer with a construction schedule. PG&E crews then perform onsite construction work and a final inspection, taking 52 days. Service energization follows, during which PG&E restores the site, starts billing, and closes out the project, taking 20 days. Construction and service energization alone account for 72 days of PG&E responsibility.
COMMENTS:
- Author’s Statement. According to the author, “California homeowners and ADU builders are increasingly frustrated by long delays – up to a year – to obtain utility service connections. The problem is, there are no clear rules for when a utility must hook up an ADU – and no consequences for delays. SB 1196 would make sure that when a homeowner adds an ADU, they’ll be able to get it hooked up without waiting months on end.”
- Broadening the Scope of the Bill. While reducing delays in the energization of ADUs and JADUs may help facilitate housing development, establishing energization timelines that apply only to a specific type of project may be difficult to justify when other similarly situated projects face many of the same energization challenges. Projects that require distribution or service line extensions or upgrades under Electric Rules 15 or 16 may require additional engineering review, system upgrades, and cost-allocation determinations that can extend project timelines, while projects that do not require such work are generally less complex. Prior legislative efforts addressing utility energization timelines have generally applied across broad categories of customers rather than a particular project type. Given that energization timelines are often driven by the scope of utility work required to provide service, the committee recommends expanding the bill to apply to only small energization projects. For purposes of this bill, "small energization projects" would mean projects that do not require distribution or service line extensions or upgrades pursuant to Electric Rule 15 or Electric Rule 16, or any successor or substantially similar tariff adopted by the CPUC, unless the sole upgrade required is the installation of a new electric meter.
- ADU-Specific Energization Requirements. This measure would require the CPUC to establish timelines for several steps in the energization process, including load assessments, determinations regarding whether a new electrical panel or meter is required, verification of panel installation, completion of the service connection, and a complaint process for violations of those requirements. These provisions would create project-specific requirements that are not generally applicable to other customers. Recent legislation, including SB 410 (Becker, Chapter 867, Statutes of 2023) and AB 50 (Ward, Chapter 811, Statutes of 2024), focused on utility energization processes applicable across customer classes rather than establishing separate requirements for individual project types. Consistent with that approach, the committee recommends deleting proposed subdivision (b)(4) through (b)(7) of Section 934.5, relating to load assessments, electrical panel and meter determinations, verification of panel installation, completion of service connections, and the associated complaint process.
- Cancellation of Energization Applications. SB 1196 would prohibit an electrical corporation from cancelling an application for energization without the applicant's consent. Since the committee recommends broadening the bill to apply to small energization projects generally, the committee further recommends deleting references to ADUs and JADUs in this provision for consistency. The committee also recommends specifying that an electrical corporation may cancel an application if the applicant fails to respond to the electrical corporation within a timeline established by the CPUC.
- Consistency with the Powering Up Californians Act. The CPUC is currently implementing the Powering Up Californians Act pursuant to SB 410 (Becker, Chapter 867, Statutes of 2023), which directed the commission to establish energization timelines and related requirements. Given the overlap between the CPUC's implementation of the Powering Up Californians Act and the requirements proposed by this bill, the committee recommends adding a provision specifying that compliance with this section shall complement, and not conflict with, any rule, order, or determination adopted by the CPUC pursuant to the Powering Up Californians Act.
- Technical Amendments. This bill contains several provisions that would benefit from additional clarity. As such, the committee recommends several technical amendments.
- Prior Legislation.
SB 1210 (Skinner) required electrical, gas, sewer, and water service utilities, with exceptions, to post estimated fees and timeframes for new service connections needed to connect new housing construction projects. Status: Chapter 728, Statutes of 2024.
AB 50 (Wood) required the CPUC, by July 1, 2025, to determine the criteria for customers to receive timely electricity service when requesting new service connections or upgraded service, known as “energization.” Chapter 317, Statutes of 2023.
SB 410 (Becker) required the CPUC to establish by September 30, 2024, reasonable average and maximum target energization time periods in order to connect new customers and upgrade the service of existing customers to the electrical grid. Status: Chapter 394, Statutes of 2023.
AB 602 (Grayson) required, among its provisions, a city, county, or special district that has an internet website to post and update on their websites specified information, including a current schedule of housing development project costs, zoning ordinances and development standards, annual impact fee reports, and an archive of specified impact fee nexus studies. Status: Chapter 347, Statutes of 2021.
REGISTERED SUPPORT / OPPOSITION:
Support
Adu West Coast
Bequall
California Yimby
Casita Coalition
Hello Housing
Housing Action Coalition
Inspired Adus
Snapadu
Southern California Obtainable Housing
Tentmakers INC
Oppose
Edison International and Affiliates, Including Southern California Edison
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Analysis Prepared by: Lina V. Malova / U. & E. / (916) 319-2083
Example provided by SDG&E and representative of their territory. Timelines and activities reflect those for complex projects (e.g., subdivisions, developments involving design by SDG&E). Requests that do not involve SDG&E design tend to have shorter timelines. Duration of the project phases are estimates only and represent activities managed by SDG&E; i.e. do not include time for activities that are the customer responsibility. ↑
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 1196 |
THIRD READING
Bill No: SB 1196
Author: McNerney (D) and Wahab (D)
Amended: 4/20/26
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 14-2, 4/13/26
AYES: Allen, Archuleta, Arreguín, Becker, Caballero, Gonzalez, Grove, Hurtado, McNerney, Reyes, Richardson, Rubio, Stern, Wahab
NOES: Dahle, Strickland
NO VOTE RECORDED: Ochoa Bogh
SENATE APPROPRIATIONS COMMITTEE: 5-2, 5/14/26
AYES: Cervantes, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto, Dahle
SUBJECT: Accessory dwelling units and junior accessory dwelling units: electrical service connections
SOURCE: Author
DIGEST:
- This bill requires the California Public Utilities Commission (CPUC), by September 30, 2027, in a new or existing proceeding, to establish timelines for electrical corporations to respond to and process requests to energize accessory dwelling units (ADUs) and junior accessory dwelling units (JADUs).
ANALYSIS:
Existing law:
- Establishes and vests the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical corporations. (Article 12 of the California Constitution)
- Defines an “electrical corporation” to include every corporation or person owning, controlling, operating, or managing any electric plant for compensation within this state, except where electricity is generated on or distributed by the producer through private property solely for its own use or the use of its tenants and not for sale or transmission to others. (Public Utilities Code § 218)
- Authorizes the CPUC to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. (Public Utilities Code § 451)
- Prohibits a public utility from making or granting any preference or advantage to any corporation or person or subject any corporation or person to any prejudice or disadvantage as to rates, charges, service, facilities, or in any other respect. (Public Utilities Code § 453)
- Requires the CPUC to enforce rules governing the extension of service by electrical corporations. (Public Utilities Code § 783)
- Establishes the Powering Up Californians Act and requires the CPUC to determine the criteria for timely service for electrical customers to be energized, including categories of timely electric service through energization, as specified. (Public Utilities Code § 930 et seq.)
- Establishes the policy of the state that each electrical corporation promptly energize new customers, including by ensuring that new housing, new businesses, new electric equipment in buildings, and new charging for light-duty, medium-duty, and heavy-duty vehicles and off-road vehicles, vessels, trains, and equipment can be used without delay caused by a failure of the electrical corporation to implement energization projects. (Public Utilities Code § 933)
- Requires the CPUC to determine the criteria for timely service for electric customers to be energized. (Public Utilities Code § 933.5)
- Requires the CPUC, by September 30, 2024, to establish reasonable average and maximum target energization time periods. Requires the targets ensure that work is completed in a manner that minimizes delay in meeting the date requested by the customer to the greatest extent possible. Requires procedures for customers to report energization delays to the CPUC and for electrical corporations to annually report on their performance. (Public Utilities Code § 934)
- Requires, for a new housing construction, those utilities to publicly post on their internet websites a schedule of estimated fees for typical service connections for each housing development type and the estimated timeframes for completing typical service connections needed for each housing type. (Public Utilities Code § 8400)
This bill:
- Defines an “accessory dwelling unit” as set forth in Section 66313 of the Government Code and defines “junior accessory dwelling unit” has the same meaning as set forth in Section 66313 of the Government Code.
- Requires the CPUC, by September 30, 2027, in a new or existing proceeding, to establish timelines for electrical corporations to respond to and process requests to energize ADUs and JADUs, as provided.
- Requires the CPUC in establishing the timelines for energization, to require electrical corporations to comply with certain requirements.
Background
Connecting to the electric and gas distribution grid. Rules governing the ability of new buildings and generation and storage resources to connect to the electric and gas distribution grid are generally determined by statute, CPUC rules, and tariffs, (i.e., documents that specify rates, charges, rules, and conditions under which an electrical corporation will provide services to the public) for each of the electrical corporations. New service connections refer to extending an electricity or expanding distribution infrastructure to service new or expanded customer load, known as “energization.” Electric Tariff Rules 15 and 16 establish the guidelines for design, cost allocation, and responsibilities of a project applicant and a utility for electric distribution line extensions. The ability to connect to the larger electrical system can take months (if not, years, in some cases) as the process can entail the need for designs, assessments on cost allocations associated with improvements on the electric distribution system to allow for the connection, and other issues. In the case of new building developments, depending on the size of the development, the need for electric service extensions may be needed in phases over months, or years.
Energization target time periods. SB 410 (Becker, Chapter 394, Statutes of 2023), the Powering Up Californians Act, required the CPUC to establish by September 30, 2024, reasonable average and maximum target energization time periods in order to connect new customers and upgrade the service of existing customers to the electrical grid. The bill also required reporting by electrical corporations and authorized specified annual cost-recovery, subject to a cap. AB 50 (Wood, Chapter 317, Statutes of 2023) required the CPUC to determine the criteria for timely service for electric customers to be energized. In CPUC proceeding (R. 24-01-018) the CPUC adopted a decision in September 2024 (D. 24-09-020) which established timelines for energization requests and a procedure for customers to report energization delays to the CPUC. The table below notes the new targets and timelines adopted by the CPUC.
Energization Type | Average Energization Target (calendar days) | Maximum Energization Target (calendar days) |
Rule 15 | 182 | 357 |
Rule 16 | 182 | 335 |
Rule 15/16 combined | 182 | 306 |
Application Decision | 10 | 45 |
Main panel upgrade | 30 | 45 |
Comments
Need for this bill. The author states:
California homeowners and ADU builders are increasingly frustrated by long delays – up to a year – to obtain utility service connections. The problem is, there are no clear rules for when a utility must hook up an ADU – and no consequences for delays. SB 1196 would make sure that when a homeowner adds an ADU, they’ll be able to get it hooked up without waiting months on end.
This bill requires the CPUC to require timelines of electric IOUs to respond to requests for energization of ADU projects. The author’s office has shared their primary concern is the pace of connections within the service territory of the IOUs. The backlog for energization has been an issue the Legislature has taken action to address with the passage of SB 410 and AB 50 among others. The CPUC initiated Rulemaking R.24‑01‑018 to define utility‑controlled steps, adopt average and maximum timelines, and implement standardized reporting and enforcement mechanisms. In its opposition, Pacific Gas and Electric (PG&E) notes that imposing separate, statutory timelines specific to JADUs/ADUs would undermine the framework from SB 410. Under CPUC Rulemaking 24‑01‑018, utilities must provide written approval or rejection of applications within an average of 10 calendar days and no more than 45 calendar days. PG&E and Southern California Edison contend the bill undermines the existing CPUC rulemaking process, including introducing duplicative measures. They argue that requiring utilities to revisit established progress is unnecessary and risks diverting resources from continued implementation and improvement efforts already directed by the CPUC. Additionally, they raise concerns that SB 1196 creates a preferential carve‑out for ADU and JADU projects, prioritizing one class of customers over others, potentially running afoul of Public Utilities Code § 453, which prohibits preferential treatment in the provision of utility services.
Related/Prior Legislation
SB 1210 (Skinner, Chapter 728, Statutes of 2024) required electrical, gas, sewer, and water service utilities, with exceptions, to post estimated fees and timeframes for new service connections needed to connect new housing construction projects.
AB 50 (Wood, Chapter 317, Statutes of 2023) required the CPUC, by July 1, 2025, to determine the criteria for customers to receive timely electricity service when requesting new service connections or upgraded service, known as “energization.”
SB 410 (Becker, Chapter 394, Statutes of 2023) required the CPUC to establish by September 30, 2024, reasonable average and maximum target energization time periods in order to connect new customers and upgrade the service of existing customers to the electrical grid.
AB 602 (Grayson, Chapter 347, Statutes of 2021) required, among its provisions, a city, county, or special district that has an internet website to post and update on their websites specified information, including a current schedule of housing development project costs, zoning ordinances and development standards, annual impact fee reports, and an archive of specified impact fee nexus studies.
AB 1026 (Wood, Chapter 446, Statutes of 2019) required an electrical or gas corporation to apply only those construction and design specifications, standards, terms, and conditions that are applicable to a new extension of service project for the 18 months following the date the application for a new extension of service project is approved.
AB 1600 (Cortese, Chapter 927, Statutes of 1987) required a local agency when increasing or imposing a fee as a condition of approval of a development project, on or after January 1, 1989, to take specified actions, including identifying the purpose of the fee.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee:
The CPUC estimates ongoing costs of about $500,000 annually (ratepayer funds) to establish (1) energization time periods for ADU and junior ADUs, (2) the process to report ADU and junior ADU energization delays, and (3) reasonable penalties for IOUs that fail to meet their adopted obligations, as well as to consider modifications and ensure utility compliance, as required by this bill.
SUPPORT: (Verified 5/14/26)
Bequall
California Solar & Storage Association
California Yimby
Casita Coalition
Housing Action Coalition
OPPOSITION: (Verified 5/14/26)
Pacific Gas and Electric Company
Southern California Edison
ARGUMENTS IN SUPPORT: According to California YIMBY:
California has enacted numerous laws to accelerate the creation of ADUs, and today, ADUs comprise the fastest-growing sector of the housing market. However, homeowners and ADU builders are increasingly frustrated by long delays in obtaining utility service connections. In some cases, applicants have been forced to wait up to a year, placing an undue financial burden on property owners and SB 1196 will streamline ADU construction by creating clear timelines for utility service connections; allowing applicants to submit a request for a utility hookup at the same time they request a building permit; barring utilities from canceling a service for utilities that fail to provide timely hookups.
ARGUMENTS IN OPPOSITION: According to Pacific Gas & Electric and Southern California Edison:
SB 1196 undermines the critical work taking place in the Establishing Energization Timeline Order Instituting Rulemaking (Energization OIR) established by AB 50 (Wood) and SB 410 (Becker). This bill presents duplicative measures that fail to recognize the progress that utilities have made to improve the energization process. In Phase 1 of the Energization OIR, the California Public Utilities Commission (CPUC) established a reasonable framework based on an electrical corporation’s historical timelines and set new targets to reduce energization delays. …SB 1196 creates a preferential carve‑out for ADU and JADU projects, prioritizing one class of customers over others. By singling out ADUs and JADUs for expedited treatment, the bill risks unintended consequences by elevating this project type above other customers, contrary to Public Utilities Code § 453, which prohibits preferential treatment in the provision of utility services. If enacted, SB 1196 would pressure utilities to prioritize ADU and JADU projects ahead of critical infrastructure projects such as hospitals, schools, and fire stations to avoid the bill’s punitive penalties. Today, ADUs and JADUs are already served through CPUC‑approved tariffs—primarily Rules 15, and 16—and are subject to the same Energization OIR framework as other residential projects. Creating a separate statutory prioritization is unnecessary and undermines the CPUC’s role in ensuring equitable, non‑discriminatory service across all customers.
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
5/16/26 10:44:08
**** END ****
SENATE COMMITTEE ON
Senator Sabrina Cervantes, Chair
2025 - 2026 Regular Session
SB 1196 (McNerney) - Accessory dwelling units and junior ADUs: electrical service connections
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would require the California Public Utilities Commission (CPUC) to establish timelines for electrical corporations to respond to and process requests to energize ADUs (ADUs) and junior ADUs, as provided. It would also require the CPUC, in establishing the timelines for energization, to require electrical corporations to comply with certain requirements.
Fiscal Impact:
- The CPUC estimates ongoing costs of about $500,000 annually (ratepayer funds) to establish (1) energization time periods for ADU and junior ADUs, (2) the process to report ADU and junior ADU energization delays, and (3) reasonable penalties for IOUs that fail to meet their adopted obligations, as well as to consider modifications and ensure utility compliance, as required by this bill.
Background:
Rules governing the ability of new buildings and generation and storage resources to connect to the electric and gas distribution grid are generally determined by statute, CPUC rules, and tariffs, (i.e., document that specify rates, charges, rules, and conditions under which an electrical corporation will provide services to the public) for each of the electrical corporations. New service connections refers to extending an electricity or expanding distribution infrastructure to service new or expanded customer load, known as “energization.” Electric Tariff Rules 15 and 16 establish the guidelines for design, cost allocation, and responsibilities of a project applicant and a utility for electric distribution line extensions. The ability to connect to the larger electrical system can take months (if not, years, in some cases) as the process can entail the need for designs, assessments on cost allocations associated with improvements on the electric distribution system to allow for the connection, and other issues. In the case of new building developments, depending on the size of the development, the need for electric service extensions may be needed in phases over months, or years.
Proposed Law:
This bill would:
- Require the CPUC, by September 30, 2027, in a new or existing proceeding, to establish timelines for electrical corporations to respond to and process requests to energize ADUs and junior ADUs, as provided.
- Require the CPUC, in establishing the timelines for energization, to do all of the following:
- Establish the times by which an application received by an electrical corporation shall be determined to be complete and by which the determination is to be provided in writing to the applicant.
- Require an electrical corporation to provide a list of deficiencies for an application determined to be incomplete and an explanation of how the applicant may remedy the deficiencies.
- Establish the time by which an electrical corporation is required to respond to a cured application.
- Establish the time by which an electrical corporation is required to provide a load assessment for an ADU and inform the applicant as to whether a new electrical panel or electrical meter is required to provide the electrical service connection.
- Establish the time by which an electrical corporation is required to verify that the installation of an electrical panel is complete.
- Establish the time by which an electrical corporation is required to complete the service connection after the applicant provides notification to the electrical corporation that the construction of a new ADU is complete.
- Establish a process for an applicant for an ADU or a junior ADU to file a complaint with the commission for a violation of these requirements.
- Determine the penalties that shall be assessed on an electrical corporation for failing to comply with the timelines.
- Allow the CPUC, in establishing the timelines, to consider a modification to shorten the timelines, as provided.
- Require the CPUC, in establishing the timelines for energization, to require electrical corporations to comply with all of the following:
- Allow an application for energization to be submitted with the electrical corporation at the same time an applicant applies for a building permit with the local permitting agency.
- Not cancel an application for energization for an accessory dwelling unit or a junior accessory dwelling unit without the applicant’s consent.
- Provide the applicant the opportunity to extend the timeline if the applicant requests a delay in completing the service connection.
- Provide the applicant with an option to engage with electrical corporation staff for preapplication project review.
- Provide the applicant with the electrical corporation’s upfront estimates of costs for the applicant’s planning purposes that include estimates of all related fees, charges, and potential upgrades to electrical corporation infrastructure, including for increases in the amount of electricity to the property, that may be needed for energization.
- Provide that no reimbursement would be required due to specified reasons.
Related Legislation:
SB 1210 (Skinner, Chapter 728, Statutes of 2024) required electrical, gas, sewer, and water service utilities, with exceptions, to post estimated fees and timeframes for new service connections needed to connect new housing construction projects.
AB 50 (Wood, Chapter 317, Statutes of 2023) required the CPUC, by July 1, 2025, to determine the criteria for customers to receive timely electricity service when requesting new service connections or upgraded service, known as “energization.”
SB 410 (Becker, Chapter 394, Statutes of 2023) required the CPUC to establish by September 30, 2024, reasonable average and maximum target energization time periods in order to connect new customers and upgrade the service of existing customers to the electrical grid.
AB 602 (Grayson, Chapter 347, Statutes of 2021) required, among its provisions, a city, county, or special district that has an internet website to post and update on their websites specified information, including a current schedule of housing development project costs, zoning ordinances and development standards, annual impact fee reports, and an archive of specified impact fee nexus studies.
AB 1026 (Wood, Chapter 446, Statutes of 2019) required an electrical or gas corporation to apply only those construction and design specifications, standards, terms, and conditions that are applicable to a new extension of service project for the 18 months following the date the application for a new extension of service project is approved.
AB 1600 (Cortese, Chapter 927, Statutes of 1987) required a local agency when increasing or imposing a fee as a condition of approval of a development project, on or after January 1, 1989, to take specified actions, including identifying the purpose of the fee.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Benjamin Allen, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 4/13/2026
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill requires specified timelines by when utilities must respond to requests to connect service for accessory dwelling units (ADUs) and junior ADUs (JADU).
ANALYSIS:
Existing law:
- Establishes and vests the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical corporations, gas corporations, sewer system corporations, and water corporations. While publicly owned utilities, are under the direction of their governing boards, including: municipal utility districts, public utility districts, and irrigation districts. (Article 12 of the California Constitution)
- Defines an “electrical corporation” to include every corporation or person owning, controlling, operating, or managing any electric plant for compensation within this state, except where electricity is generated on or distributed by the producer through private property solely for its own use or the use of its tenants and not for sale or transmission to others. (Public Utilities Code §218)
- Defines a “gas corporation” to include every corporation or person owning, controlling, operating, or managing any gas plant for compensation within this state, except where gas is made or produced on and distributed by the maker or producer through private property alone solely for his own use or the use of his tenants and not for sale to others. (Public Utilities Code §222)
- Defines “sewer system corporation” to include every corporation or person owning, controlling, operating, or managing any sewer system for compensation within the state. (Public Utilities Code §230.6)
- Defines “municipal utility district” as a district formed under the Municipal Utility District Act. (Public Utilities Code §11503)
- Defines a “public utility district” as a district formed under the Public Utilities District Act. (Public Utilities Code §15501 et seq.)
- Requires, for a new housing construction, those utilities to publicly post on their internet websites a schedule of estimated fees for typical service connections for each housing development type and the estimated timeframes for completing typical service connections needed for each housing type. (Public Utilities Code §8400)
- Requires a local agency when increasing or imposing a fee as a condition of approval of a development project, on or after January 1, 1989, to take specified actions, including identifying the purpose of the fee. (Government Code §66000 et seq.)
- Requires independent special districts to maintain an internet website, unless a majority of the governing board adopts a resolution determining a hardship exists in their ability to establish or maintain a website (such as lack of broadband service). (Government Code §53087.8)
This bill:
- Requires each of the “utilities” to post on its internet website a comprehensive checklist of items that an applicant is required to submit to the utility for an application for obtaining a service connection to an ADU or JADU to be deemed complete, to provide an option for the applicant to engage with staff for preapplication project review, and to provide upfront estimated costs for the applicant’s planning purposes.
- Establishes a process by which utilities are required to review the submission of an application to determine whether the application is deemed complete:
- Requires, for an electrical service connection, the utility providing electrical service, within 15 business days of determining an application is complete, to make a load assessment for the ADU or JADU and to inform the applicant whether a new electrical panel or electrical meter is required to provide the service connection, as specified, and would require the utility, within 10 business days of a notification that the new electrical panel or electrical meter has been installed, to verify that the installation is completed.
- Requires a utility, within 30 days of a notification that the construction of the ADU or JADU is complete, to complete the service connection to the dwelling unit, as specified.
- Authorizes an applicant to submit, in writing, a complaint to the CPUC if the utility has violated the requirements of this bill and requires the CPUC to assess civil penalties of $10,000 per day of violation and $1 million annually, as provided.
- Requires a local agency to post on its internet website or distribute in written form to an applicant a comprehensive list of requirements for utility service connections that may be required for an ADU or JADU and contact information for each of the utilities that provide service in the jurisdiction.
Background
Connecting to the electric and gas distribution grid. Rules governing the ability of new buildings and generation and storage resources to connect to the electric and gas distribution grid are generally determined by statute, CPUC rules, and tariffs, (i.e., document that specify rates, charges, rules, and conditions under which an electrical corporation will provide services to the public) for each of the electrical corporations. New service connections refers to extending an electricity or expanding distribution infrastructure to service new or expanded customer load, known as “energization.” Electric Tariff Rules 15 and 16 establish the guidelines for design, cost allocation, and responsibilities of a project applicant and a utility for electric distribution line extensions. The ability to connect to the larger electrical system can take months (if not, years, in some cases) as the process can entail the need for designs, assessments on cost allocations associated with improvements on the electric distribution system to allow for the connection, and other issues. In the case of new building developments, depending on the size of the development, the need for electric service extensions may be needed in phases over months, or years.
Water utilities. California residents are served by an estimated 2,800 water providers of various types of water utilities or water systems, including publicly owned utilities (POUs), investor-owned utilities (IOUs), and small community water systems. Nearly half of these systems (roughly 1,100 water providers) provide water to fewer than 200 customer service connections. The majority of California’s residential water customers are served by cities, special districts, and mutual water companies. These utilities are not subject to economic regulation by the CPUC, but are instead governed by the city council, or other local governing body, which set their own water rates. As established by Proposition 218 (1996), the majority of these utilities are subject to state constitutional and statutory requirements that ensure water rates are restricted to cost-of-service. As a result, these entities have limitations, not imposed on the CPUC-regulated utilities that may hinder their ability to increase rates to fund programs or provide rate relief to customers. The CPUC has regulatory oversight over water companies that provide water service to about 16% of California’s residents with annual water and wastewater revenues totaling about $1.4 billion. Approximately 95% of those residents are served by nine large water utilities, each serving more than 10,000 customer service connections (approximately 1.175 million customers). However, the majority of the CPUC-regulated water utilities (92) have 2,000 or less customer service connections, and 87 of those have service connections of 500 or less. As with other IOUs, the CPUC regulates rates of the water utilities under its jurisdiction to ensure costs are just and reasonable. As with electric utilities, water utilities have similar service connection and capacity upgrade tariffs, in this case Water Service Tariff Rule 15.
Proposition 218 and Proposition 26. POUs are subject to differing constraints on their ability to collect rates for rate relief from one customer to another. Both Proposition 218 and Proposition 26 limit the ability of the local agencies to collect costs from a customer to fund activity by another customer, with specified limitations. Article XIIID of the California Constitution, added by Proposition 218 in 1996, required, among other things, that the revenues derived from property related fees and charges not exceed the funds required to provide the property related service. Proposition 218 also requires that property related fees and charges not exceed the proportional cost of service attributable to the property. In addition, the service for which a fee or charge is imposed must be immediately available to the property owner, rather than for future or potential use. The systems bear the burden of proving compliance with these cost-of-service requirements. These substantive restrictions on ratemaking by publicly owned water systems prevent subsidization of one customer’s water rates by another… [Source: SB 401 (Dodd, Chapter 662, Statutes of 2015) report on funding low-income water assistance programs.]
Mitigation Fee Act. The Mitigation Fee Act generally applies a broad “reasonable relationship” standard to fees and exactions, meaning that fee amounts must be arguably reasonable relative to the impacts of the project. This component of the Mitigation Fee Act makes up the basis for each city’s “nexus study,” which cities must commission to determine the type and amount of AB 1600 (Cortese, Chapter 927, Statutes of 1987) fees charged on new development. Other fees include public good fees, such as art or affordable housing.
Comments
Need for this bill. The author states:
California homeowners and ADU builders are increasingly frustrated by long delays – up to a year – to obtain utility service connections. The problem is, there are no clear rules for when a utility must hook up an ADU – and no consequences for delays. SB 1196 would make sure that when a homeowner adds an ADU, they’ll be able to get it hooked up without waiting months on end.
Potential conflicts with existing CPUC rules for electrical corporations. The author’s office has shared their primary concerns is the pace of connections within the service territory of the IOUs. The backlog for energization has been an issue this legislature has taken action to address with the passage of SB 410 (Becker, 2023) and AB 50 (Wood, 2023) among others. The CPUC initiated Rulemaking R.24‑01‑018 to define utility‑controlled steps, adopt average and maximum timelines, and implement standardized reporting and enforcement mechanisms. In its opposition, Pacific Gas and Electric notes that imposing separate, statutory timelines specific to JADUs/ADUs would undermine the framework from SB 410. Under CPUC Rulemaking 24‑01‑018, utilities must provide written approval or rejection of applications within an average of 10 business days (15 calendar days) and no more than 45 business days (66 calendar days). SB 1196 adds duplicative and potentially conflicting requirements that could create administrative confusion and delay rather than improve outcomes. They also note that the preferred approach to ADU service is the existing customer could be multimeter panels.
Need for amendments. In order to prioritize the area of primary focus for the author and sponsors, and to remain consistent CPUC’s existing efforts concerning energization requests, the author and committee may wish to recast this bill and require the CPUC to include within a new or existing proceeding consideration of the various elements of this bill concerning service for ADUs and JADUs for electrical corporations, including a requirement to assess penalties as determined by the CPUC. The author has also noted the desire to remove the provisions requiring posting the comprehensive checklist, as well as the inclusion of the other utilities.
Dual Referral. Should this bill be approved by this committee, it will be re-referred to the Senate Local Government Committee.
Prior/Related Legislation
SB 1210 (Skinner, Chapter 728, Statutes of 2024) required electrical, gas, sewer, and water service utilities, with exceptions, to post estimated fees and timeframes for new service connections needed to connect new housing construction projects.
AB 50 (Wood, Chapter 317, Statutes of 2023) required the CPUC, by July 1, 2025, to determine the criteria for customers to receive timely electricity service when requesting new service connections or upgraded service, known as “energization.”
SB 410 (Becker, Chapter 394, Statutes of 2023) required the CPUC to establish by September 30, 2024, reasonable average and maximum target energization time periods in order to connect new customers and upgrade the service of existing customers to the electrical grid.
AB 602 (Grayson, Chapter 347, Statutes of 2021) required, among its provisions, a city, county, or special district that has an internet website to post and update on their websites specified information, including a current schedule of housing development project costs, zoning ordinances and development standards, annual impact fee reports, and an archive of specified impact fee nexus studies.
AB 1026 (Wood, Chapter 446, Statutes of 2019) required an electrical or gas corporation to apply only those construction and design specifications, standards, terms, and conditions that are applicable to a new extension of service project for the 18 months following the date the application for a new extension of service project is approved.
AB 1600 (Cortese, Chapter 927, Statutes of 1987) required a local agency when increasing or imposing a fee as a condition of approval of a development project, on or after January 1, 1989, to take specified actions, including identifying the purpose of the fee.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
California Solar & Storage Association
California Yimby
Casita Coalition
Housing Action Coalition
OPPOSITION:
Pacific Gas and Electric Company
ARGUMENTS IN SUPPORT: According to California YIMBY:
California has enacted numerous laws to accelerate the creation of ADUs, and today, ADUs comprise the fastest-growing sector of the housing market. However, homeowners and ADU builders are increasingly frustrated by long delays in obtaining utility service connections. In some cases, applicants have been forced to wait up to a year, placing an undue financial burden on property owners and SB 1196 will streamline ADU construction by creating clear timelines for utility service connections; allowing applicants to submit a request for a utility hookup at the same time they request a building permit; barring utilities from canceling a service for utilities that fail to provide timely hookups.
ARGUMENTS IN OPPOSITION: According to Pacific Gas & Electric:
… SB 1196 …would impose new conflicting and duplicative statutory requirements on utilities regarding service connection timelines for Accessory Dwelling Units (ADUs) and Junior Accessory Dwelling Units (JADUs). While the bill aims to improve customer experience, several provisions conflict with existing law, established regulatory frameworks, and practical implementation realities. As drafted, SB 1196 risks creating confusion, inequitable treatment, and unintended delays for customers, while likely increasing customer costs in the process.
-- END --
Discussed in Hearing
Senate Floor
Assembly Floor
Assembly Standing Committee on Appropriations
Assembly Standing Committee on Utilities and Energy
Senate Floor
Senate Standing Committee on Energy, Utilities and Communications
Bill Author
Bill Co-Author(s):