SB 1287: Personal Income Tax Law: Corporation Tax Law: credits: shortline railroad expenditures and railroad infrastructure.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2026-04-09
Current Status:
In Progress
(2026-05-14: May 14 hearing: Held in committee and under submission.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
The Personal Income Tax Law and the Corporation Tax Law allow various credits against the taxes imposed by those laws.
This bill, the Shortline Railroad Modernization Act of 2026, would allow credits against those taxes for each taxable year beginning on or after January 1, 2026, 2027, and before January 1, 2032, to a qualified taxpayer in an amount equal to 50% of the qualified shortline railroad expenditures and for each taxable year beginning on or after January 1, 2028, and before January 1, 2033, in an amount equal to 50% of the qualified new rail infrastructure expenditures, as defined and specified.
Existing law requires a bill authorizing a new tax expenditure to contain, among other things, specific goals, purposes, and objectives the tax expenditure will achieve, detailed performance indicators, and data collection requirements.
This bill would include additional information required for any bill authorizing a new tax expenditure.
This bill would take effect immediately as a tax levy.
The Personal Income Tax Law and the Corporation Tax Law allow various credits against the taxes imposed by those laws.
This bill, the Shortline Railroad Modernization Act of 2026, would allow credits against those taxes for each taxable year beginning on or after January 1, 2026, to a qualified taxpayer in an amount equal to 50% of the qualified shortline railroad expenditures and 50% of the qualified new rail infrastructure expenditures, as defined and specified.
Existing law requires a bill authorizing a new tax expenditure to contain, among other things, specific goals, purposes, and objectives the tax expenditure will achieve, detailed performance indicators, and data collection requirements.
This bill would include additional information required for any bill authorizing a new tax expenditure.
This bill would take effect immediately as a tax levy.
This act shall be known, and may be cited, as the Shortline Railroad Modernization Act of 2026.
SEC. 2.Section 17053.31 is added to the Revenue and Taxation Code, to read:17053.31.(a)(1)For taxable years beginning on or after January 1, 2026, 2027, and before January 1, 2032, there shall be allowed to a qualified taxpayer a credit against the net tax, as defined in Section 17039, in an amount equal to 50 percent of the qualified taxpayers qualified shortline railroad expenditures, subject to paragraph (2).
(2)The amount of the credit allowed by this section shall not exceed the product of five thousand dollars ($5,000) and the number of miles of railroad track owned or leased within the State of California by the qualified taxpayer at the close of the taxable year for which the credit is claimed.
(3)The credit shall be allowed for the taxable year in which the department issues the credit certificate pursuant to subdivision (d).
(4)The aggregate amount of credits that may be allocated in a fiscal year pursuant to this section and Section 23631 shall not exceed seven million dollars ($7,000,000).
(b)For purposes of this section:
(1)Board means the Franchise Tax Board.
(2)Department means the Department of Transportation.
(3)(A)Qualified shortline railroad expenditures means the nonreimbursed costs paid or incurred by the qualified taxpayer for railroad infrastructure maintenance and or capital improvements for of infrastructure or capital owned or leased by the qualified taxpayer to operate a Class II or Class III railroad, including, but not limited to, maintenance of or improvements to rail, tie plates, joint bars, fasteners, switches, ballast, subgrade, bridges, industrial leads, sidings, signs, safety barriers, crossing signal and gates, industrial spur, industry track, and related track structures.
(B)Qualified shortline railroad expenditures does not include any cost paid or incurred by the qualified taxpayer that is used as the basis for a federal tax credit or credit, that is funded by a federal grant. grant, or that was paid or incurred more than 12 months before the date the qualified taxpayer submitted their application for credit certification.
(4)Qualified taxpayer means either of the following:
(A)A company that owns a person or entity engaged in a trade or business that operates a railroad located wholly or partly in California that is classified by the federal Surface Transportation Board as a Class II or Class III railroad.
(B)An owner or lessee of a rail siding, industrial spur, or industry track located on or adjacent to any railroad in California.(c)(1)In the case where the credit allowed under this section exceeds the net tax, as defined in Section 17039, for a taxable year, the excess credit may be carried over to reduce the net tax in the following taxable year, and succeeding five taxable years, if necessary, until the credit has been exhausted.
(2)A credit allowed pursuant to this section for a qualified taxpayer that is a partnership, limited liability company, or an estate or trust shall be distributed to the partner, members, or beneficiaries in the same manner as income is distributed.(3)A qualified taxpayer may assign all or part of the credit allowed pursuant to this section.(A)The qualified taxpayer and the assignee shall report to the Franchise Tax Board, in the form and manner specified by the board, all required information regarding the assignment of the credit. The amount paid in consideration of the assignment shall not exceed the amount of the credit assigned.(B)A credit shall not be assigned pursuant to this paragraph to more than one taxpayer, nor may the credit be reassigned by the assignee to another taxpayer.(C)A party that has acquired a tax credit under this section shall be subject to the requirements of this section.(D)A qualified taxpayer shall not assign a tax credit to the extent the tax credit allowed by this section is claimed on any tax return of the qualified taxpayer.(E)In the event that the taxpayer originally allocated a credit under this section by the department and a taxpayer to whom the credit has been assigned both claim the same amount of credit on their tax returns, the board may disallow the credit of either taxpayer, so long as the statute of limitations upon assessment remains open.(d)If the credit allowed by this section is claimed by a qualified taxpayer, any deduction or credit otherwise allowed under this part for any qualified expenditures made by the qualified taxpayer as a trade or business expense shall be reduced by the amount of the credit allowed by this section.
(e)Notwithstanding any other law, a qualified taxpayer may sell any credit allowed under this section to an unrelated party.
(d)(f)(1)To be eligible for allocated a credit under this section, a qualified taxpayer shall apply to the department for a credit certification pursuant to this subdivision.
(2)The qualified taxpayer shall submit an application, in the form and manner prescribed by the department, upon completion of the project for which the for qualified shortline railroad expenditures were incurred. The application shall include both all of the following:
(A)The number of miles of railroad track owned or leased in California.
(B)A description and certification, statement, under penalty of perjury, of the amount of describing the taxpayers qualified shortline railroad expenditures. expenditures, including itemized amounts and the infrastructure maintenance or capital improvement for which the expense was paid or incurred.
(C)The estimated number of miles of railroad track owned or leased in California at the close of the taxable year in which the credit will be claimed if a certificate is issued by the department.
(D)Information regarding the beginning and end of the taxpayers taxable year.
(E)Any information deemed necessary by the department to determine whether the taxpayer is a qualified taxpayer.
(F)Any information deemed necessary by the department to determine the amount of the credit.
(3)(A)The department shall evaluate a taxpayers application and shall issue a credit certificate upon finding the taxpayer is eligible for the credit allowed by this section on determining that the taxpayer meets all of the following:
(i)Is a qualified taxpayer.
(ii)Will likely continue to be a qualified taxpayer for the taxable year in which the credit certificate is issued.
(iii)Has qualified shortline railroad expenditures.
(iv)Has satisfactorily submitted a complete application pursuant to paragraph (2).
(B)The department shall issue credit certificates on a first-come-first-served basis, subject to the aggregate amount allowed under paragraph (4) of subdivision (a).
(A)(C)The certificate shall state the amount of the credit allowed. allocated to the qualified taxpayer as allowed by this section. The credit amount allocated shall be calculated as described in subdivision (a).
(B)(D)The department shall annually provide the board with a list of qualified taxpayers to whom a certificate has been issued and the tax credit amounts allocated to each qualified taxpayer.
(E)The board may disallow a credit to a taxpayer that has received a credit certificate from the department if the board finds that the taxpayer does not meet the criteria described in subparagraph (A) of paragraph (3).
(e)(g)The department and the board may prescribe rules, guidelines, or procedures necessary or appropriate to carry out the purposes of this section and Section 23631. section.
(f)(h)For purposes of complying with Section 41 for the tax credits allowed under this section and Sections 17053.32, 23631, and 23632, the Legislature finds and declares all of the following:
(1)The specific goals, purposes, and objectives the tax credits will achieve include all of the following:
(A)Improving the safety, reliability, and efficiency of shortline and regional rail service, consistent with the 2024 California State Rail Plan.
(B)Preserving and enhancing rail access for existing industrial, agricultural, and commercial shippers, and facilitating new rail-served economic development.
(C)Supporting the diversion of freight movement from trucks to rail by preserving and expanding rail infrastructure capacity, thereby reducing highway congestion, pavement damage, and vehicle emissions.
(D)Supporting job retention and job creation in rail-dependent industries and associated supply chains through increased private capital investment in rail infrastructure.
(2)The detailed performance indicators for the Legislature to use when measuring whether the tax credits meet the goals, purposes, and objectives described in subparagraph (A) include all of the following:
(A)The number of miles of railroad track improved, rehabilitated, or constructed as a result of projects receiving the credit.
(B)The number and type of rail infrastructure projects completed, including track, bridges, sidings, and spurs.
(C)Private capital investment leveraged by the tax credits, expressed as a ratio of private dollars invested per dollar of tax credit claimed.
(3)Data collection requirements to enable the Legislature to determine whether the tax credits are meeting, failing to meet, or exceeding those specific goals, purposes, and objectives include both of the following:
(A)A description of each project for which the credit was claimed, including project location and general scope of work, and, where applicable, the approximate number of track miles improved or constructed.
(B)The amount of qualified expenditures incurred and the amount of credit claimed.
(i)(1)On or before June 30, 2028, and each June 30 thereafter, the department, in collaboration with the board, and to the extent feasible, shall submit a report to the Legislature in compliance with Section 9795 of the Government Code containing the information described in paragraph (3) of subdivision (h) for the most recent taxable year.
(2)The disclosure provisions of this paragraph shall be treated as an exception to Section 19542.
(j)This section shall remain in effect only until December 1, 2032, and as of that date is repealed.
SEC. 3.Section 17053.32 is added to the Revenue and Taxation Code, to read:17053.32.(a)(1)For taxable years beginning on or after January 1, 2026, 2028, and before January 1, 2033, there shall be allowed to a qualified taxpayer a credit against the net tax, as defined in Section 17039, in an amount equal to 50 percent of the qualified taxpayers qualified new rail infrastructure expenditures, subject to paragraph (2).
(2)The amount of the credit allowed by this section shall not exceed one million dollars ($1,000,000) per new rail infrastructure project completed in the taxable year for which the credit is claimed.
(3)The credit shall be allowed for the taxable year in which the department issues the credit certificate pursuant to subdivision (d).
(4)The aggregate amount of credits that may be allocated in a fiscal year pursuant to this section and Section 23631 23632 shall not exceed ten million dollars ($10,000,000).
(b)For purposes of this section:
(1)Board means the Franchise Tax Board.
(2)Department means the Department of Transportation.
(3)New rail infrastructure project means a project to acquire, engineer, or construct new rail infrastructure, or improvements thereto, included with servicing customer locations or expansions by any railroad located in California, including, but not limited to, a right-of-way; new track, including industrial leads, switches, spurs, and siding; rail loading dock; and transloading structures.
(4)(A)Qualified new rail infrastructure expenditures means the nonreimbursed costs paid or incurred by the qualified taxpayer for a new rail infrastructure project that has been precertified by the department and is commenced within 12 months of the issuance of a credit precertification letter.
(B)Qualified new rail infrastructure expenditures does not include any cost paid or incurred by the qualified taxpayer that is used as the basis for a federal tax credit, that is funded by a federal grant, or that was paid or incurred more than 12 months before the date the qualified taxpayer submitted their application for credit certification.
(5)(A)Qualified taxpayer means either of the following:
(A)(i)A company that owns owns, or a person or entity engaged in a trade or business that operates, a railroad located wholly or partly in California that is classified by the federal Surface Transportation Board as a Class II or Class III railroad.
(B)(ii)An owner or lessee of a rail siding, industrial spur, or industry track located on or adjacent to any railroad in California.(B)Qualified taxpayer does not include a railroad that is classified by the federal Surface Transportation Board as a Class I railroad.
(c)(1)In the case where the credit allowed under this section exceeds the net tax, as defined in Section 17039, for a taxable year, the excess credit may be carried over to reduce the net tax in the following taxable year, and succeeding five taxable years, if necessary, until the credit has been exhausted.
(2)A credit allowed pursuant to this section for a qualified taxpayer that is a partnership, a limited liability company, an S corporation, or an estate or trust shall be distributed to the partner, members, shareholders, or beneficiaries in the same manner as income is distributed.(3)A qualified taxpayer may assign all or part of the credit allowed pursuant to this section.(A)The qualified taxpayer and the assignee shall report to the Franchise Tax Board, in the form and manner specified by the board, all required information regarding the assignment of the credit. The amount paid in consideration of the assignment shall not exceed the amount of the credit assigned.(B)A credit shall not be assigned pursuant to this paragraph to more than one taxpayer, nor may the credit be reassigned by the assignee to another taxpayer.(C)A party that has acquired a tax credit under this section shall be subject to the requirements of this section.(D)A qualified taxpayer shall not assign a tax credit to the extent the tax credit allowed by this section is claimed on any tax return of the qualified taxpayer.(E)In the event that the taxpayer originally allocated a credit under this section by the department and a taxpayer to whom the credit has been assigned both claim the same amount of credit on their tax returns, the board may disallow the credit of either taxpayer, so long as the statute of limitations upon assessment remains open.(d)If the credit allowed by this section is claimed by a qualified taxpayer, any deduction or credit otherwise allowed under this part for any qualified expenditures made by the qualified taxpayer as a trade or business expense shall be reduced by the amount of the credit allowed by this section.
(e)Notwithstanding any other law, a qualified taxpayer may sell any credit allowed under this section to an unrelated party.
(d)(f)(1)To be eligible for allocated a credit under this section, a qualified taxpayer shall apply to the department for a credit precertification and a credit certification pursuant to this subdivision.
(2)(A)A qualified taxpayer shall submit an application for a credit precertification, in the form and manner prescribed by the department, before commencing a new rail infrastructure project. department. The application shall include all of the following:
(i)The number of miles of railroad track owned or leased in California.
(ii)A statement, under penalty of perjury, describing the taxpayers anticipated qualified new rail infrastructure expenditures, including itemized amounts and the new rail infrastructure project for which the expense was paid or incurred.
(iii)The estimated number of miles of railroad track owned or leased in California at the close of the taxable year in which the credit will be claimed if a certificate is issued by the department.
(iv)Information regarding the beginning and end of the taxpayers taxable year.
(v)Any information deemed necessary by the department to determine whether the taxpayer is a qualified taxpayer.
(vi)Any information deemed necessary by the department to determine the amount of the credit.
(B)The (i)Beginning January 1, 2027, and before January 1, 2033, the department shall establish quarterly application windows for precertification applications. Applications received during a quarterly window shall be reviewed together. The department shall evaluate a taxpayers application and shall issue a credit precertification letter upon finding the project and taxpayer meet the following requirements for a credit allowed by this section, in accordance with the priority criteria described in subparagraph (C) and subject to the annual aggregate amount allowed under paragraph (4) of subdivision (a). The (a):
(I)Is a qualified taxpayer.
(II)Will likely continue to be a qualified taxpayer for the taxable year in which the credit certificate is issued.
(III)Will have qualified new rail infrastructure expenditures.
(IV)Has satisfactorily submitted a complete application pursuant to this paragraph.
(ii)The credit precertification letter shall include the maximum amount of the credit allowed under this section based on the estimated qualified new rail infrastructure expenditures included in the application and subject to the limit described in paragraph (2) of subdivision (a). section, which shall be calculated as described in subdivision (a) and based on the estimated new rail infrastructure expenditures included in the application.
(iii)The board may disallow a credit to a taxpayer that has received a credit certificate from the department if the board finds that the taxpayer does not meet the criteria described in clause (i).
(C)The department shall give priority to applications for projects that provide critical rail access to industrial parks, ports, or economic development projects located adjacent to rail or that serve businesses in value-added agriculture, advanced manufacturing, supply chain or distribution solutions, or environmentally friendly or sustainable manufacturing, including those reducing carbon emissions or utilizing renewable energy.
(D)If the annual aggregate amount allowed under paragraph (4) of subdivision (a) is not fully allocated in any quarterly period, the unused amount shall carry forward to the next quarterly application period within the same fiscal year. Any amount not awarded by the close of the fiscal year shall expire.
(3)The qualified taxpayer shall annually submit an application, in the form and manner prescribed by the department, upon completion of pertaining to qualified new rail infrastructure expenditures incurred for the new rail infrastructure project. The application taxpayer shall provide any documentation required by the department to certify completion of the project and to calculate the credit amount. determine whether the taxpayer has incurred qualified new rail infrastructure expenditures submitted in their application for which a credit precertification letter was issued.
(A)The department shall evaluate a taxpayers application and shall issue a credit certificate upon finding the taxpayer is eligible for the credit allowed by this section. meets both of the following:
(i)Is a qualified taxpayer.
(ii)Has paid or incurred new costs for qualified new rail infrastructure expenditures that were included in their precertification letter.
(B)The certificate shall state the amount of the credit allowed. allowed for the taxable year for which the annual certification application was received and the remaining amount of the credit allocated pursuant to the precertification letter. Notwithstanding paragraph (1) of subdivision (a), the amount of the credit shall not exceed the maximum amount listed in the credit precertification letter.
(C)The department shall annually provide the board with a list of qualified taxpayers to whom a certificate has been issued and issued, the tax credit amounts allocated to each qualified taxpayer. taxpayer for the current taxable year, the remaining amounts of credits allocated pursuant to precertification letters, and any other information the board deems necessary for administering the credit allowed by this section.
(e)(g)The department and the board may prescribe rules, guidelines, or procedures necessary or appropriate to carry out the purposes of this section and Section 23632. section.
(h)This section shall remain in effect only until December 1, 2033, and as of that date is repealed.
SEC. 4.Section 23631 is added to the Revenue and Taxation Code, to read:23631.(a)(1)For taxable years beginning on or after January 1, 2026, 2027, and before January 1, 2032, there shall be allowed to a qualified taxpayer a credit against the tax, defined in Section 23036, in an amount equal to 50 percent of the qualified taxpayers qualified shortline railroad expenditures, subject to paragraph (2).
(2)The amount of the credit allowed by this section shall not exceed the product of five thousand dollars ($5,000) and the number of miles of railroad track owned or leased within the State of California by the qualified taxpayer at the close of the taxable year for which the credit is claimed.
(3)The credit shall be allowed for the taxable year in which the department issues the credit certificate pursuant to subdivision (d).
(4)The aggregate amount of credits that may be allocated in a fiscal year pursuant to this section and Section 17053.31 shall not exceed seven million dollars ($7,000,000).
(b)For purposes of this section:
(1)Board means the Franchise Tax Board.
(2)Department means the Department of Transportation.
(3)(A)Qualified shortline railroad expenditures means the nonreimbursed costs paid or incurred by the qualified taxpayer for railroad infrastructure maintenance and or capital improvements for of infrastructure or capital owned or leased by the qualified taxpayer to operate a Class II or Class III railroad, including, but not limited to, maintenance of or improvements to rail, tie plates, joint bars, fasteners, switches, ballast, subgrade, bridges, industrial leads, sidings, signs, safety barriers, crossing signal and gates, industrial spur, industry track, and related track structures.
(B)Qualified shortline railroad expenditures does not include any cost paid or incurred by the qualified taxpayer that is used as the basis for a federal tax credit or credit, that is funded by a federal grant. grant, or that was paid or incurred more than 12 months before the date the qualified taxpayer submitted their application for credit certification.
(4)Qualified taxpayer means either of the following:
(A) A company that owns a person or entity engaged in a trade or business that operates a railroad located wholly or partly in California that is classified by the federal Surface Transportation Board as a Class II or Class III railroad.
(B)An owner or lessee of a rail siding, industrial spur, or industry track located on or adjacent to any railroad in California.(c)(1)In the case where the credit allowed under this section exceeds the tax, defined in Section 23036, for a taxable year, the excess credit may be carried over to reduce the tax in the following taxable year, and succeeding five taxable years, if necessary, until the credit has been exhausted.
(2)A qualified taxpayer may assign all or part of the credit allowed pursuant to this section.(A)The qualified taxpayer and the assignee shall report to the Franchise Tax Board, in the form and manner specified by the board, all required information regarding the assignment of the credit. The amount paid in consideration of the assignment shall not exceed the amount of the credit assigned.(B)A credit shall not be assigned pursuant to this paragraph to more than one taxpayer, nor may the credit be reassigned by the assignee to another taxpayer.(C)A party that has acquired a tax credit under this section shall be subject to the requirements of this section.(D)A qualified taxpayer shall not assign a tax credit to the extent the tax credit allowed by this section is claimed on any tax return of the qualified taxpayer.(E)In the event that the taxpayer originally allocated a credit under this section by the department and a taxpayer to whom the credit has been assigned both claim the same amount of credit on their tax returns, the board may disallow the credit of either taxpayer, so long as the statute of limitations upon assessment remains open.(d)If the credit allowed by this section is claimed by a qualified taxpayer, any deduction or credit otherwise allowed under this part for any qualified expenditures made by the qualified taxpayer as a trade or business expense shall be reduced by the amount of the credit allowed by this section.
(e)Notwithstanding any other law, a qualified taxpayer may sell any credit allowed under this section to an unrelated party.
(d)(f)(1)To be eligible for allocated a credit under this section, a qualified taxpayer shall apply to the department for a credit certification pursuant to this subdivision.
(2)The qualified taxpayer shall submit an application, in the form and manner prescribed by the department, upon completion of the project for which the for qualified shortline railroad expenditures were incurred. The application shall include both all of the following:
(A)The number of miles of railroad track owned or leased in California.
(B)A description and certification, statement, under penalty of perjury, of the amount of describing the taxpayers qualified shortline railroad expenditures. expenditures, including itemized amounts and the infrastructure maintenance or capital improvement for which the expense was paid or incurred.
(C)The estimated number of miles of railroad track owned or leased in California at the close of the taxable year in which the credit will be claimed if a certificate is issued by the department.
(D)Information regarding the beginning and end of the taxpayers taxable year.
(E)Any information deemed necessary by the department to determine whether the taxpayer is a qualified taxpayer.
(F)Any information deemed necessary by the department to determine the amount of the credit.
(3)(A)The department shall evaluate a taxpayers application and shall issue a credit certificate upon finding the taxpayer is eligible for the credit allowed by this section on a determining that the taxpayer meets all of the following:
(i)Is a qualified taxpayer.
(ii)Will likely continue to be a qualified taxpayer for the taxable year in which the credit certificate is issued.
(iii)Has qualified shortline railroad expenditures.
(iv)Has satisfactorily submitted a complete application pursuant to paragraph (2).
(B)The department shall issue credit certificates on a first-come-first-served basis, subject to the aggregate amount allowed under paragraph (4) of subdivision (a).
(A)(C)The certificate shall state the amount of the credit allowed. allocated to the qualified taxpayer as allowed by this section. The credit amount allocated shall be calculated as described in subdivision (a).
(B)(D)The department shall annually provide the board with a list of qualified taxpayers to whom a certificate has been issued and the tax credit amounts allocated to each qualified taxpayer.
(E)The board may disallow a credit to a taxpayer that has received a credit certificate from the department if the board finds that the taxpayer does not meet the criteria described in subparagraph (A).
(g)The department and the board may prescribe rules, guidelines, or procedures necessary or appropriate to carry out the purposes of this section.
(h)This section shall remain in effect only until December 1, 2032, and as of that date is repealed.
SEC. 5.Section 23632 is added to the Revenue and Taxation Code, to read:23632.(a)(1)For taxable years beginning on or after January 1, 2026, 2028, and before January 1, 2033, there shall be allowed to a qualified taxpayer a credit against the tax, defined in Section 23036, in an amount equal to 50 percent of the qualified taxpayers qualified new rail infrastructure expenditures, subject to paragraph (2).
(2)The amount of the credit allowed by this section shall not exceed one million dollars ($1,000,000) per new rail infrastructure project completed in the taxable year for which the credit is claimed.
(3)The credit shall be allowed for the taxable year in which the department issues the credit certificate pursuant to subdivision (d).
(4)The aggregate amount of credits that may be allocated in a fiscal year pursuant to this section and Section 23631 17052.32 shall not exceed ten million dollars ($10,000,000).
(b)For purposes of this section:
(1)Board means the Franchise Tax Board.
(2)Department means the Department of Transportation.
(3)New rail infrastructure project means a project to acquire, engineer, or construct new rail infrastructure, or improvements thereto, included with servicing customer locations or expansions by any railroad located in California, including, but not limited to, a right-of-way; new track, including industrial leads, switches, spurs, and siding; rail loading dock; and transloading structures.
(4)(A)Qualified new rail infrastructure expenditures means the nonreimbursed costs paid or incurred by the qualified taxpayer for a new rail infrastructure project that has been precertified by the department and is commenced within 12 months of the issuance of a credit precertification letter.
(B)Qualified new rail infrastructure expenditures does not include any cost paid or incurred by the qualified taxpayer that is used as the basis for a federal tax credit, that is funded by a federal grant, or that was paid or incurred more than 12 months before the date the qualified taxpayer submitted their application for credit certification.
(5)(A)Qualified taxpayer means either of the following:
(A)(i)A company that owns owns, or a person or entity engaged in a trade or business that operates, a railroad located wholly or partly in California that is classified by the federal Surface Transportation Board as a Class II or Class III railroad.
(B)(ii)An owner or lessee of a rail siding, industrial spur, or industry track located on or adjacent to any railroad in California.(B)Qualified taxpayer does not include a railroad that is classified by the federal Surface Transportation Board as a Class I railroad.
(c)(1)In the case where the credit allowed under this section exceeds the tax, defined in Section 23036, for a taxable year, the excess credit may be carried over to reduce the tax in the following taxable year, and succeeding five taxable years, if necessary, until the credit has been exhausted.
(2)A credit allowed pursuant to this section for a qualified taxpayer that is a partnership, a limited liability company, an S corporation, or an estate or trust shall be distributed to the partner, members, shareholders, or beneficiaries in the same manner as income is distributed.(3)A qualified taxpayer may assign all or part of the credit allowed pursuant to this section.(A)The qualified taxpayer and the assignee shall report to the Franchise Tax Board, in the form and manner specified by the board, all required information regarding the assignment of the credit. The amount paid in consideration of the assignment shall not exceed the amount of the credit assigned.(B)A credit shall not be assigned pursuant to this paragraph to more than one taxpayer, nor may the credit be reassigned by the assignee to another taxpayer.(C)A party that has acquired a tax credit under this section shall be subject to the requirements of this section.(D)A qualified taxpayer shall not assign a tax credit to the extent the tax credit allowed by this section is claimed on any tax return of the qualified taxpayer.(E)In the event that the taxpayer originally allocated a credit under this section by the department and a taxpayer to whom the credit has been assigned both claim the same amount of credit on their tax returns, the board may disallow the credit of either taxpayer, so long as the statute of limitations upon assessment remains open.(d)If the credit allowed by this section is claimed by a qualified taxpayer, any deduction or credit otherwise allowed under this part for any qualified expenditures made by the qualified taxpayer as a trade or business expense shall be reduced by the amount of the credit allowed by this section.
(e)Notwithstanding any other law, a qualified taxpayer may sell any credit allowed under this section to an unrelated party.
(d)(f)(1)To be eligible for allocated a credit under this section, a qualified taxpayer shall apply to the department for a credit precertification and a credit certification pursuant to this subdivision.
(2)(A)A qualified taxpayer shall submit an application for a credit precertification, in the form and manner prescribed by the department, before commencing a new rail infrastructure project. department. The application shall include all of the following:
(i)The number of miles of railroad track owned or leased in California.
(ii)A statement, under penalty of perjury, describing the taxpayers anticipated qualified new rail infrastructure expenditures, including itemized amounts and the new rail infrastructure project for which the expense was paid or incurred.
(iii)The estimated number of miles of railroad track owned or leased in California at the close of the taxable year in which the credit will be claimed if a certificate is issued by the department.
(iv)Information regarding the beginning and end of the taxpayers taxable year.
(v)Any information deemed necessary by the department to determine whether the taxpayer is a qualified taxpayer.
(vi)Any information deemed necessary by the department to determine the amount of the credit.
(B)The (i)Beginning January 1, 2027, and before January 1, 2033, the department shall establish quarterly application windows for precertification applications. Applications received during a quarterly window shall be reviewed together. The department shall evaluate a taxpayers application and shall issue a credit precertification letter upon finding the project and taxpayer meet the following requirements for a credit allowed by this section, in accordance with the priority criteria described in subparagraph (C) and subject to the annual aggregate amount allowed under paragraph (4) of subdivision (a). The (a):
(I)Is a qualified taxpayer.
(II)Will likely continue to be a qualified taxpayer for the taxable year in which the credit certificate is issued.
(III)Will have qualified new rail infrastructure expenditures.
(IV)Has satisfactorily submitted a complete application pursuant to this paragraph.
(ii)The credit precertification letter shall include the maximum amount of the credit allowed under this section based on the estimated qualified new rail infrastructure expenditures included in the application and subject to the limit described in paragraph (2) of subdivision (a). section, which shall be calculated as described in subdivision (a) and based on the estimated new rail infrastructure expenditures included in the application.
(iii)The board may disallow a credit to a taxpayer that has received a credit certificate from the department if the board finds that the taxpayer does not meet the criteria described in clause (i).
(C)The department shall give priority to applications for projects that provide critical rail access to industrial parks, ports, or economic development projects located adjacent to rail or that serve businesses in value-added agriculture, advanced manufacturing, supply chain or distribution solutions, or environmentally friendly or sustainable manufacturing, including those reducing carbon emissions or utilizing renewable energy.
(D)If the annual aggregate amount allowed under paragraph (4) of subdivision (a) is not fully allocated in any quarterly period, the unused amount shall carry forward to the next quarterly application period within the same fiscal year. Any amount not awarded by the close of the fiscal year shall expire.
(3)The qualified taxpayer shall annually submit an application, in the form and manner prescribed by the department, upon completion of pertaining to qualified new rail infrastructure expenditures incurred for the new rail infrastructure project. The application taxpayer shall provide any documentation required by the department to certify completion of the project and to calculate the credit amount. determine whether the taxpayer has incurred qualified new rail infrastructure expenditures submitted in their application for which a credit precertification letter was issued.
(A)The department shall evaluate a taxpayers application and shall issue a credit certificate upon finding the taxpayer is eligible for the credit allowed by this section. meets both of the following:
(i)Is a qualified taxpayer.
(ii)Has paid or incurred new costs for qualified new rail infrastructure expenditures that were included in their precertification letter.
(B)The certificate shall state the amount of the credit allowed. allowed for the taxable year for which the annual certification application was received and the remaining amount of the credit allocated pursuant to the precertification letter. Notwithstanding paragraph (1) of subdivision (a), the amount of the credit shall not exceed the maximum amount listed in the credit precertification letter.
(C)The department shall annually provide the board with a list of qualified taxpayers to whom a certificate has been issued and issued, the tax credit amounts allocated to each qualified taxpayer. taxpayer for the current taxable year, the remaining amounts of credits allocated pursuant to precertification letters, and any other information the board deems necessary for administering the credit allowed by this section.
(g)The department and the board may prescribe rules, guidelines, or procedures necessary or appropriate to carry out the purposes of this section.
(h)This section shall remain in effect only until December 1, 2033, and as of that date is repealed.
SEC. 6.This act provides for a tax levy within the meaning of Article IV of the California Constitution and shall go into immediate effect.
This act shall be known, and may be cited, as the Shortline Railroad Modernization Act of 2026.
SEC. 2.Section 17053.31 is added to the Revenue and Taxation Code, to read:17053.31.(a)(1)For taxable years beginning on or after January 1, 2026, there shall be allowed to a qualified taxpayer a credit against the net tax, as defined in Section 17039, in an amount equal to 50 percent of the qualified taxpayers qualified shortline railroad expenditures, subject to paragraph (2).
(2)The amount of the credit allowed by this section shall not exceed the product of five thousand dollars ($5,000) and the number of miles of railroad track owned or leased within the State of California by the qualified taxpayer at the close of the taxable year for which the credit is claimed.
(3)The credit shall be allowed for the taxable year in which the department issues the credit certificate pursuant to subdivision (d).
(4)The aggregate amount of credits that may be allocated in a fiscal year pursuant to this section and Section 23631 shall not exceed seven million dollars ($7,000,000).
(b)For purposes of this section:
(1)Board means the Franchise Tax Board.
(2)Department means the Department of Transportation.
(3)(A)Qualified shortline railroad expenditures means the costs paid or incurred by the qualified taxpayer for railroad infrastructure maintenance and capital improvements for infrastructure or capital owned or leased by a Class II or Class III railroad, including, but not limited to, maintenance of or improvements to rail, tie plates, joint bars, fasteners, switches, ballast, subgrade, bridges, industrial leads, sidings, signs, safety barriers, crossing signal and gates, and related track structures.
(B)Qualified shortline railroad expenditures does not include any cost paid or incurred by the qualified taxpayer that is used as the basis for a federal tax credit or that is funded by a federal grant.
(4)Qualified taxpayer means either of the following:
(A) A company that owns a railroad located wholly or partly in California that is classified by the federal Surface Transportation Board as a Class II or Class III railroad.
(B)An owner or lessee of a rail siding, industrial spur, or industry track located on or adjacent to any railroad in California.
(c)(1)In the case where the credit allowed under this section exceeds the net tax, as defined in Section 17039, for a taxable year, the excess credit may be carried over to reduce the net tax in the following taxable year, and succeeding five taxable years, if necessary, until the credit has been exhausted.
(2)A credit allowed pursuant to this section for a qualified taxpayer that is a partnership, limited liability company, or an estate or trust shall be distributed to the partner, members, or beneficiaries in the same manner as income is distributed.
(3)A qualified taxpayer may assign all or part of the credit allowed pursuant to this section.
(A)The qualified taxpayer and the assignee shall report to the Franchise Tax Board, in the form and manner specified by the board, all required information regarding the assignment of the credit. The amount paid in consideration of the assignment shall not exceed the amount of the credit assigned.
(B)A credit shall not be assigned pursuant to this paragraph to more than one taxpayer, nor may the credit be reassigned by the assignee to another taxpayer.
(C)A party that has acquired a tax credit under this section shall be subject to the requirements of this section.
(D)A qualified taxpayer shall not assign a tax credit to the extent the tax credit allowed by this section is claimed on any tax return of the qualified taxpayer.
(E)In the event that the taxpayer originally allocated a credit under this section by the department and a taxpayer to whom the credit has been assigned both claim the same amount of credit on their tax returns, the board may disallow the credit of either taxpayer, so long as the statute of limitations upon assessment remains open.
(d)(1)To be eligible for a credit under this section, a qualified taxpayer shall apply to the department for a credit certification pursuant to this subdivision.
(2)The qualified taxpayer shall submit an application, in the form and manner prescribed by the department, upon completion of the project for which the qualified shortline railroad expenditures were incurred. The application shall include both of the following:
(A)The number of miles of railroad track owned or leased in California.
(B)A description and certification, under penalty of perjury, of the amount of the taxpayers qualified shortline railroad expenditures.
(3)The department shall evaluate a taxpayers application and shall issue a credit certificate upon finding the taxpayer is eligible for the credit allowed by this section on a first-come-first-served basis, subject to the aggregate amount allowed under paragraph (4) of subdivision (a).
(A)The certificate shall state the amount of the credit allowed.
(B)The department shall annually provide the board with a list of qualified taxpayers to whom a certificate has been issued and the tax credit amounts allocated to each qualified taxpayer.
(e)The department and the board may prescribe rules, guidelines, or procedures necessary or appropriate to carry out the purposes of this section and Section 23631.
(f)For purposes of complying with Section 41 for the tax credits allowed under this section and Sections 17053.32, 23631, and 23632, the Legislature finds and declares all of the following:
(1)The specific goals, purposes, and objectives the tax credits will achieve include all of the following:
(A)Improving the safety, reliability, and efficiency of shortline and regional rail service, consistent with the 2024 California State Rail Plan.
(B)Preserving and enhancing rail access for existing industrial, agricultural, and commercial shippers, and facilitating new rail-served economic development.
(C)Supporting the diversion of freight movement from trucks to rail by preserving and expanding rail infrastructure capacity, thereby reducing highway congestion, pavement damage, and vehicle emissions.
(D)Supporting job retention and job creation in rail-dependent industries and associated supply chains through increased private capital investment in rail infrastructure.
(2)The detailed performance indicators for the Legislature to use when measuring whether the tax credits meet the goals, purposes, and objectives described in subparagraph (A) include all of the following:
(A)The number of miles of railroad track improved, rehabilitated, or constructed as a result of projects receiving the credit.
(B)The number and type of rail infrastructure projects completed, including track, bridges, sidings, and spurs.
(C)Private capital investment leveraged by the tax credits, expressed as a ratio of private dollars invested per dollar of tax credit claimed.
(3)Data collection requirements to enable the Legislature to determine whether the tax credits are meeting, failing to meet, or exceeding those specific goals, purposes, and objectives include both of the following:
(A)A description of each project for which the credit was claimed, including project location and general scope of work, and, where applicable, the approximate number of track miles improved or constructed.
(B)The amount of qualified expenditures incurred and the amount of credit claimed.
SEC. 3.Section 17053.32 is added to the Revenue and Taxation Code, to read:17053.32.(a)(1)For taxable years beginning on or after January 1, 2026, there shall be allowed to a qualified taxpayer a credit against the net tax, as defined in Section 17039, in an amount equal to 50 percent of the qualified taxpayers qualified new rail infrastructure expenditures, subject to paragraph (2).
(2)The amount of the credit allowed by this section shall not exceed one million dollars ($1,000,000) per new rail infrastructure project completed in the taxable year for which the credit is claimed.
(3)The credit shall be allowed for the taxable year in which the department issues the credit certificate pursuant to subdivision (d).
(4)The aggregate amount of credits that may be allocated in a fiscal year pursuant to this section and Section 23631 shall not exceed ten million dollars ($10,000,000).
(b)For purposes of this section:
(1)Board means the Franchise Tax Board.
(2)Department means the Department of Transportation.
(3)New rail infrastructure project means a project to acquire, engineer, or construct new rail infrastructure, or improvements thereto, included with servicing customer locations or expansions by any railroad located in California, including, but not limited to, a right-of-way; new track, including industrial leads, switches, spurs, and siding; rail loading dock; and transloading structures.
(4)Qualified new rail infrastructure expenditures means the costs paid or incurred by the qualified taxpayer for a new rail infrastructure project that has been precertified by the department and is commenced within 12 months of the issuance of a credit precertification letter.
(5)Qualified taxpayer means either of the following:
(A)A company that owns a railroad located wholly or partly in California that is classified by the federal Surface Transportation Board as a Class II or Class III railroad.
(B)An owner or lessee of a rail siding, industrial spur, or industry track located on or adjacent to any railroad in California.
(c)(1)In the case where the credit allowed under this section exceeds the net tax, as defined in Section 17039, for a taxable year, the excess credit may be carried over to reduce the net tax in the following taxable year, and succeeding five taxable years, if necessary, until the credit has been exhausted.
(2)A credit allowed pursuant to this section for a qualified taxpayer that is a partnership, a limited liability company, an S corporation, or an estate or trust shall be distributed to the partner, members, shareholders, or beneficiaries in the same manner as income is distributed.
(3)A qualified taxpayer may assign all or part of the credit allowed pursuant to this section.
(A)The qualified taxpayer and the assignee shall report to the Franchise Tax Board, in the form and manner specified by the board, all required information regarding the assignment of the credit. The amount paid in consideration of the assignment shall not exceed the amount of the credit assigned.
(B)A credit shall not be assigned pursuant to this paragraph to more than one taxpayer, nor may the credit be reassigned by the assignee to another taxpayer.
(C)A party that has acquired a tax credit under this section shall be subject to the requirements of this section.
(D)A qualified taxpayer shall not assign a tax credit to the extent the tax credit allowed by this section is claimed on any tax return of the qualified taxpayer.
(E)In the event that the taxpayer originally allocated a credit under this section by the department and a taxpayer to whom the credit has been assigned both claim the same amount of credit on their tax returns, the board may disallow the credit of either taxpayer, so long as the statute of limitations upon assessment remains open.
(d)(1)To be eligible for a credit under this section, a qualified taxpayer shall apply to the department for a credit precertification and a credit certification pursuant to this subdivision.
(2)(A)A qualified taxpayer shall submit an application for a credit precertification, in the form and manner prescribed by the department, before commencing a new rail infrastructure project.
(B)The department shall establish quarterly application windows for precertification applications. Applications received during a quarterly window shall be reviewed together. The department shall evaluate a taxpayers application and shall issue a credit precertification letter upon finding the project and taxpayer meet the requirements for a credit allowed by this section, in accordance with the priority criteria described in subparagraph (C) and subject to the annual aggregate amount allowed under paragraph (4) of subdivision (a). The credit precertification letter shall include the maximum amount of the credit allowed under this section based on the estimated qualified new rail infrastructure expenditures included in the application and subject to the limit described in paragraph (2) of subdivision (a).
(C)The department shall give priority to applications for projects that provide critical rail access to industrial parks, ports, or economic development projects located adjacent to rail or that serve businesses in value-added agriculture, advanced manufacturing, supply chain or distribution solutions, or environmentally friendly or sustainable manufacturing, including those reducing carbon emissions or utilizing renewable energy.
(D)If the annual aggregate amount allowed under paragraph (4) of subdivision (a) is not fully allocated in any quarterly period, the unused amount shall carry forward to the next quarterly application period within the same fiscal year. Any amount not awarded by the close of the fiscal year shall expire.
(3)The qualified taxpayer shall submit an application, in the form and manner prescribed by the department, upon completion of the new rail infrastructure project. The application shall provide any documentation required by the department to certify completion of the project and to calculate the credit amount.
(A)The department shall evaluate a taxpayers application and shall issue a credit certificate upon finding the taxpayer is eligible for the credit allowed by this section.
(B)The certificate shall state the amount of the credit allowed. Notwithstanding paragraph (1) of subdivision (a), the amount of the credit shall not exceed the maximum amount listed in the credit precertification letter.
(C)The department shall annually provide the board with a list of qualified taxpayers to whom a certificate has been issued and the tax credit amounts allocated to each qualified taxpayer.
(e)The department and the board may prescribe rules, guidelines, or procedures necessary or appropriate to carry out the purposes of this section and Section 23632.
SEC. 4.Section 23631 is added to the Revenue and Taxation Code, to read:23631.(a)(1)For taxable years beginning on or after January 1, 2026, there shall be allowed to a qualified taxpayer a credit against the tax, defined in Section 23036, in an amount equal to 50 percent of the qualified taxpayers qualified shortline railroad expenditures, subject to paragraph (2).
(2)The amount of the credit allowed by this section shall not exceed the product of five thousand dollars ($5,000) and the number of miles of railroad track owned or leased within the State of California by the qualified taxpayer at the close of the taxable year for which the credit is claimed.
(3)The credit shall be allowed for the taxable year in which the department issues the credit certificate pursuant to subdivision (d).
(4)The aggregate amount of credits that may be allocated in a fiscal year pursuant to this section and Section 17053.31 shall not exceed seven million dollars ($7,000,000).
(b)For purposes of this section:
(1)Board means the Franchise Tax Board.
(2)Department means the Department of Transportation.
(3)(A)Qualified shortline railroad expenditures means the costs paid or incurred by the qualified taxpayer for railroad infrastructure maintenance and capital improvements for infrastructure or capital owned or leased by a Class II or Class III railroad, including, but not limited to, maintenance of or improvements to rail, tie plates, joint bars, fasteners, switches, ballast, subgrade, bridges, industrial leads, sidings, signs, safety barriers, crossing signal and gates, and related track structures.
(B)Qualified shortline railroad expenditures does not include any cost paid or incurred by the qualified taxpayer that is used as the basis for a federal tax credit or that is funded by a federal grant.
(4)Qualified taxpayer means either of the following:
(A) A company that owns a railroad located wholly or partly in California that is classified by the federal Surface Transportation Board as a Class II or Class III railroad.
(B)An owner or lessee of a rail siding, industrial spur, or industry track located on or adjacent to any railroad in California.
(c)(1)In the case where the credit allowed under this section exceeds the tax, defined in Section 23036, for a taxable year, the excess credit may be carried over to reduce the tax in the following taxable year, and succeeding five taxable years, if necessary, until the credit has been exhausted.
(2)A qualified taxpayer may assign all or part of the credit allowed pursuant to this section.
(A)The qualified taxpayer and the assignee shall report to the Franchise Tax Board, in the form and manner specified by the board, all required information regarding the assignment of the credit. The amount paid in consideration of the assignment shall not exceed the amount of the credit assigned.
(B)A credit shall not be assigned pursuant to this paragraph to more than one taxpayer, nor may the credit be reassigned by the assignee to another taxpayer.
(C)A party that has acquired a tax credit under this section shall be subject to the requirements of this section.
(D)A qualified taxpayer shall not assign a tax credit to the extent the tax credit allowed by this section is claimed on any tax return of the qualified taxpayer.
(E)In the event that the taxpayer originally allocated a credit under this section by the department and a taxpayer to whom the credit has been assigned both claim the same amount of credit on their tax returns, the board may disallow the credit of either taxpayer, so long as the statute of limitations upon assessment remains open.
(d)(1)To be eligible for a credit under this section, a qualified taxpayer shall apply to the department for a credit certification pursuant to this subdivision.
(2)The qualified taxpayer shall submit an application, in the form and manner prescribed by the department, upon completion of the project for which the qualified shortline railroad expenditures were incurred. The application shall include both of the following:
(A)The number of miles of railroad track owned or leased in California.
(B)A description and certification, under penalty of perjury, of the amount of the taxpayers qualified shortline railroad expenditures.
(3)The department shall evaluate a taxpayers application and shall issue a credit certificate upon finding the taxpayer is eligible for the credit allowed by this section on a first-come-first-served basis, subject to the aggregate amount allowed under paragraph (4) of subdivision (a).
(A)The certificate shall state the amount of the credit allowed.
(B)The department shall annually provide the board with a list of qualified taxpayers to whom a certificate has been issued and the tax credit amounts allocated to each qualified taxpayer.
SEC. 5.Section 23632 is added to the Revenue and Taxation Code, to read:23632.(a)(1)For taxable years beginning on or after January 1, 2026, there shall be allowed to a qualified taxpayer a credit against the tax, defined in Section 23036, in an amount equal to 50 percent of the qualified taxpayers qualified new rail infrastructure expenditures, subject to paragraph (2).
(2)The amount of the credit allowed by this section shall not exceed one million dollars ($1,000,000) per new rail infrastructure project completed in the taxable year for which the credit is claimed.
(3)The credit shall be allowed for the taxable year in which the department issues the credit certificate pursuant to subdivision (d).
(4)The aggregate amount of credits that may be allocated in a fiscal year pursuant to this section and Section 23631 shall not exceed ten million dollars ($10,000,000).
(b)For purposes of this section:
(1)Board means the Franchise Tax Board.
(2)Department means the Department of Transportation.
(3)New rail infrastructure project means a project to acquire, engineer, or construct new rail infrastructure, or improvements thereto, included with servicing customer locations or expansions by any railroad located in California, including, but not limited to, a right-of-way; new track, including industrial leads, switches, spurs, and siding; rail loading dock; and transloading structures.
(4)Qualified new rail infrastructure expenditures means the costs paid or incurred by the qualified taxpayer for a new rail infrastructure project that has been precertified by the department and is commenced within 12 months of the issuance of a credit precertification letter.
(5)Qualified taxpayer means either of the following:
(A)A company that owns a railroad located wholly or partly in California that is classified by the federal Surface Transportation Board as a Class II or Class III railroad.
(B)An owner or lessee of a rail siding, industrial spur, or industry track located on or adjacent to any railroad in California.
(c)(1)In the case where the credit allowed under this section exceeds the tax, defined in Section 23036, for a taxable year, the excess credit may be carried over to reduce the tax in the following taxable year, and succeeding five taxable years, if necessary, until the credit has been exhausted.
(2)A credit allowed pursuant to this section for a qualified taxpayer that is a partnership, a limited liability company, an S corporation, or an estate or trust shall be distributed to the partner, members, shareholders, or beneficiaries in the same manner as income is distributed.
(3)A qualified taxpayer may assign all or part of the credit allowed pursuant to this section.
(A)The qualified taxpayer and the assignee shall report to the Franchise Tax Board, in the form and manner specified by the board, all required information regarding the assignment of the credit. The amount paid in consideration of the assignment shall not exceed the amount of the credit assigned.
(B)A credit shall not be assigned pursuant to this paragraph to more than one taxpayer, nor may the credit be reassigned by the assignee to another taxpayer.
(C)A party that has acquired a tax credit under this section shall be subject to the requirements of this section.
(D)A qualified taxpayer shall not assign a tax credit to the extent the tax credit allowed by this section is claimed on any tax return of the qualified taxpayer.
(E)In the event that the taxpayer originally allocated a credit under this section by the department and a taxpayer to whom the credit has been assigned both claim the same amount of credit on their tax returns, the board may disallow the credit of either taxpayer, so long as the statute of limitations upon assessment remains open.
(d)(1)To be eligible for a credit under this section, a qualified taxpayer shall apply to the department for a credit precertification and a credit certification pursuant to this subdivision.
(2)(A)A qualified taxpayer shall submit an application for a credit precertification, in the form and manner prescribed by the department, before commencing a new rail infrastructure project.
(B)The department shall establish quarterly application windows for precertification applications. Applications received during a quarterly window shall be reviewed together. The department shall evaluate a taxpayers application and shall issue a credit precertification letter upon finding the project and taxpayer meet the requirements for a credit allowed by this section, in accordance with the priority criteria described in subparagraph (C) and subject to the annual aggregate amount allowed under paragraph (4) of subdivision (a). The credit precertification letter shall include the maximum amount of the credit allowed under this section based on the estimated qualified new rail infrastructure expenditures included in the application and subject to the limit described in paragraph (2) of subdivision (a).
(C)The department shall give priority to applications for projects that provide critical rail access to industrial parks, ports, or economic development projects located adjacent to rail or that serve businesses in value-added agriculture, advanced manufacturing, supply chain or distribution solutions, or environmentally friendly or sustainable manufacturing, including those reducing carbon emissions or utilizing renewable energy.
(D)If the annual aggregate amount allowed under paragraph (4) of subdivision (a) is not fully allocated in any quarterly period, the unused amount shall carry forward to the next quarterly application period within the same fiscal year. Any amount not awarded by the close of the fiscal year shall expire.
(3)The qualified taxpayer shall submit an application, in the form and manner prescribed by the department, upon completion of the new rail infrastructure project. The application shall provide any documentation required by the department to certify completion of the project and to calculate the credit amount.
(A)The department shall evaluate a taxpayers application and shall issue a credit certificate upon finding the taxpayer is eligible for the credit allowed by this section.
(B)The certificate shall state the amount of the credit allowed. Notwithstanding paragraph (1) of subdivision (a), the amount of the credit shall not exceed the maximum amount listed in the credit precertification letter.
(C)The department shall annually provide the board with a list of qualified taxpayers to whom a certificate has been issued and the tax credit amounts allocated to each qualified taxpayer.
SEC. 6.This act provides for a tax levy within the meaning of Article IV of the California Constitution and shall go into immediate effect.
|
Date
|
Status
|
|---|---|
| May 14, 2026 | May 14 hearing: Held in committee and under submission. |
| May 8, 2026 | Set for hearing May 14. |
| May 4, 2026 | May 4 hearing: Placed on APPR. suspense file. |
| Apr 24, 2026 | Set for hearing May 4. |
| Apr 22, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 12. Noes 0. Page 3985.) (April 21). Re-referred to Com. on APPR. |
| Apr 22, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 12. Noes 0.) (April 21). Re-referred to Com. on APPR. |
| Apr 14, 2026 | Set for hearing April 21. |
| Apr 9, 2026 | Read second time and amended. Re-referred to Com. on TRANS. |
| Apr 8, 2026 | From committee: Do pass as amended and re-refer to Com. on TRANS. (Ayes 5. Noes 0. Page 3795.) (April 8). |
| Apr 8, 2026 | From committee: Do pass as amended and re-refer to Com. on TRANS. (Ayes 5. Noes 0.) (April 8). |
| Mar 25, 2026 | Set for hearing April 8. |
| Mar 4, 2026 | Referred to Coms. on REV. & TAX. and TRANS. |
| Feb 23, 2026 | Read first time. |
| Feb 23, 2026 | From printer. May be acted upon on or after March 23. |
| Feb 20, 2026 | Introduced. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| May 4, 2026 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 21, 2026 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Transportation |
Passed |
|
| Apr 8, 2026 | Do pass as amended, but first amend, and re-refer to the Committee on [Transportation] | Senate Standing Committee on Revenue and Taxation |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| ARIZONA & CALIFORNIA RAILROAD COMPANY | ** Support | |
| Association Of California Egg Farmers | ** Support | |
| California Grain & Feed Association | ** Support | |
| California Northern Railroad Company | ** Support | |
| California Short Line Railroad Association | ** Support | |
| California Short Line Railroad Association (Sponsor) | ** Support | |
| California Tax Reform Association | ** Against | |
| California Teachers Association | ** Against | |
| CENTRAL OREGON & PACIFIC RAILROAD INC. | ** Support | |
| Central Valley Ag Group | ** Support | |
| City Of Oakdale | ** Support | |
| Copper and Gold, LLC | ** Support | |
| Empire Mining Co., LLC | ** Support | |
| Garden Grove Chamber Of Commerce | ** Support | |
| Genesee & Wyoming Railroad Services, Inc. | ** Support | |
| Genesee & Wyoming Railroad Services, INC. (Sponsor) | ** Support | |
| Harbor Association of Industry and Commerce | ** Support | |
| Huron Transfer | ** Support | |
| Huron Transfer, LLC | ** Support | |
| JS West and Companies | ** Support | |
| Pacific Egg & Poultry Association | ** Support | |
| Patriot Rail | ** Support | |
| Quality Transport, INC & Truck-rail Handling, INC | ** Support | |
| Redondo Beach Chamber of Commerce | ** Support | |
| San Diego & Imperial Valley Railroad Company, INC. | ** Support | |
| San Joaquin Valley Policy Council | ** Support | |
| Sierra Northern Railway | ** Support | |
| Solano Economic Development Corporation | ** Support | |
| South Bay Association of Chambers of Commerce | ** Support | |
| Superior Soil Supplements | ** Support | |
| Titan Terminal and Transport | ** Support | |
| Truck-Rail Handling, Inc. & Quality Transport, Inc. | ** Support | |
| Tulare County Resource Management Agency | ** Support | |
| Tuolumne County Transportation Council | ** Support | |
| Ventura County Railroad Company | ** Support | |
| Ventura Transfer Company | ** Support | |
| Wilmington Chamber of Commerce | ** Support |
SENATE COMMITTEE ON
Senator Sabrina Cervantes, Chair
2025 - 2026 Regular Session
SB 1287 (Hurtado) - Personal Income Tax Law: Corporation Tax Law: credits: shortline railroad expenditures and railroad infrastructure
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
SB 1287 would establish a 50 percent tax credit for short line railroads to maintain, construct, or improve rail infrastructure, as specified.
Fiscal Impact:
- The Franchise Tax Board (FTB) estimates that this bill would result in General Fund revenue losses of $1.6 million in 2026-27, $7 million in 2027-28, and $11 million in 2028-29. FTB’s administrative costs have yet to be identified.
- The California Department of Transportation (Caltrans) would be tasked with and collecting applications and issuing certifications of eligibility for the credit. The resulting implementation costs also have yet to be identified, but would likely be, at a minimum, in the hundreds of thousands of dollars annually.
Background:
Tax expenditure programs (TEPs) are special tax provisions that reduce the amount of revenues the “basic” tax system would otherwise generate in order to provide (1) benefits to certain groups of taxpayers, and/or (2) incentives to encourage certain types of behavior and activities, such as charitable giving. Specifically, current law provides for, among other things, various income and corporation tax credits and deductions, as well as exemptions from the sales and use tax. The Department of Finance is required to publish a list of TEPs (currently totaling several hundred), which currently exceed $94 billion annually.
Tax credits directly reduce the amount of tax owed by a taxpayer, making them more impactful than deductions because they result in a dollar-for-dollar reduction. They come in two main types: nonrefundable credits, which can reduce tax to zero, and refundable credits, which can result in a refund if they exceed tax liability. Trhey are used to encourage specific behaviors like working, raising children, pursuing education, or investing in clean energy, but each credit has its own eligibility rules, income limits, and phase-outs. Under current state law, the only refundable credits are the Earned Income Tax Credit, the Young Child Tax Credit, the Foster Youth Tax Credit, and the Motion Picture and Television Production Credit.
Class II and Class III railroads, commonly referred to as short line railroads, are the “first-mile, last-mile” of the freight rail network. California Public Utilities Commission data indicate that currently, there are two Class I railroads, no Class II railroads, and 24 Class III railroads in the State. Short line railroads link communities to the broader national rail system and serve farmers, miners, energy producers, port facilities, grain elevators, and countless other businesses to move goods to local and international markets. Shortline railroads incur ongoing maintenance costs and are investing in infrastructure modernization to improve energy efficiency, among other initiatives.
Current federal law provides a 40 percent business tax credit for qualified railroad track maintenance expenditures paid or incurred by an eligible taxpayer during the taxable year. An eligible taxpayer includes any Class II or Class III railroad, and any person who transports property using the rail facilities of a Class II or Class III railroad or who furnishes railroad-related property or services to a Class II or Class III railroad. The credit is limited to $3,500 times the number of miles of railroad track, as specified. California does not conform to this federal tax credit.
In 2019, the Legislature enacted the Short-Line Infrastructure Improvement Act (SB 87, Hurtado), requiring the California Transportation Commission (CTC) to create a competitive funding program for short-line railroad infrastructure projects. SB 87 included a one-time appropriation of $7.2 million from the Trade Corridors Improvement Fund (TCIF) for the program. CTC subsequently created the Short-Line Railroad Improvement Program to fund projects such as railroad reconstruction, maintenance, upgrade, or replacement for short-line rail infrastructure. CTC awarded project funding amounts according to the following limits: (1) the grant funding cannot exceed 50 percent of the total project cost, (2) at least 30 percent of the total project cost must come from nongovernmental sources, and (3) funding to an individual project cannot exceed 25 percent of the total funding available in a fiscal year.
Proposed Law:
This bill, among other things, would do the following:
- Allow credits against the personal income tax and corporation tax for taxable years 2027 through 2031, to a qualified taxpayer in an amount equal to 50 percent of the qualified shortline railroad expenditures and for taxable years 2028 through 2033, in an amount equal to 50 percent of the qualified new rail infrastructure expenditures, as provided.
- Task Caltrans with collecting applications and issuing certifications of eligibility for the credit.
Related Legislation:
- SB 87 (Hurtado, Chapter 32, Statutes of 2019) created a competitive funding program for short line railroad infrastructure projects and included a one-time appropriation of $7.2 million for the program from TCIF.
- AB 1397 (Burke, 2019) would have created a 50 percent tax credit for short line railroads for reconstruction or replacement projects, capped at $3,500 per mile. This bill was held under submission on the Suspense File of the Assembly Revenue and Taxation Committee.
-- END --
SENATE COMMITTEE ON TRANSPORTATION
Senator Dave Cortese, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 4/21/2026
Author: | Hurtado | ||
Version: | 04/09/2026 Amended | ||
Urgency: | Yes | Fiscal: | Yes |
Consultant: | Samuel Myers | ||
SUBJECT:
DIGEST: This bill establishes a 50% tax credit for short line railroads to maintain, construct, or improve rail infrastructure, and tasks the California Department of Transportation (Caltrans) with collecting applications and issuing certifications of eligibility for the credit.
ANALYSIS:
Existing federal law:
- Establishes the Short Line Tax Credit, which allows a 40% credit for short line railroads for investments in track and bridge improvements, capped at $3,500 per mile. (26 USC 45G)
Existing state law:
- Allows for credits against corporate taxes and lays out details of their implementation. (RTC 23036)
- Enumerates the specific credits allowed against corporate taxes. (RTC 2.11 Chapter 3.5)
- Allows for credits against personal income taxes and lays out details of their implementation. (RTC 17039)
- Enumerates the specific credits allowed against personal income taxes. (RTC 2.10 Chapter 2)
- Requires that any bill which provides a new tax credit must contain the following (RTC 41):
- The specified goals, purposes, and objectives that the credit will achieve;
- Detailed performance indicators that may be used to determine whether or not the credit meets these goals, purposes, and objectives;
- Data collection requirements that will inform these performance indicators; and,
- Specification of the state agencies that will collect and remit this data.
- The specified goals, purposes, and objectives that the credit will achieve;
- Establishes the Trade Corridor Enhancement Program (TCEP), funded at $300 million annually, for infrastructure improvements on federally designated Trade Corridors of National and Regional Significance, on the Primary Freight Network, and along other corridors that have a high volume of freight movement. (SHC 2192)
This bill:
- Declares this bill to be titled the Shortline Railroad Modernization Act of 2026.
- Defines a “qualified taxpayer” as a person or entity engaged in a trade or business that operates a Class II or Class III railroad located wholly or partly in California.
- Defines a “qualified shortline railroad expenditure” as non-reimbursed costs paid by a qualified taxpayer used for railroad infrastructure maintenance or capital improvements of infrastructure or capital used to operate a Class II or Class III railroad.
- Defines a “qualified new rail infrastructure expenditure” as non-reimbursed costs paid by a qualified taxpayer to construct or improve new rail infrastructure included with servicing customer locations or expansions by any railroad located in California.
- Establishes a corporate and personal income tax credit for 50% of a qualified taxpayer’s qualified shortline railroad expenditures, subject to the following conditions:
- The credit is eligible for tax years from January 1, 2027, through January 1, 2032.
- The amount of the credit allowed may not exceed the product of $5,000 and the number of miles of railroad track owned or leased within the State of California by the qualified taxpayer.
- The aggregate amount of credits issued may not exceed $7 million in a single tax year.
- The credit may not be applied to expenditures used as the basis for a federal tax credit or paid for by a federal grant.
- The credit may not be applied to an expense incurred more than 12 months before the date of certification.
- Any excess credit may be carried over for up to five years.
- The credit may be sold to an unrelated party.
- The credit is eligible for tax years from January 1, 2027, through January 1, 2032.
- Establishes a corporate and personal income tax credit for 50% of a qualified taxpayer’s qualified new rail infrastructure expenditures, subject to the following conditions:
- The credit is eligible for tax years from January 1, 2028, through January 1, 2033.
- The amount of the credit allowed may not exceed $1 million per new rail infrastructure project.
- The aggregate amount of credits issued may not exceed $10 million in a single tax year.
- The credit may not be applied to expenditures used as the basis for a federal tax credit or paid for by a federal grant.
- The credit may not be applied to an expense incurred more than 12 months before the date of certification.
- Any excess credit may be carried over for up to five years.
- The credit may be sold to an unrelated party.
- The credit is eligible for tax years from January 1, 2028, through January 1, 2033.
- Requires that in order to claim the credit a taxpayer must submit an application to Caltrans containing, among other items, a description of the taxpayer’s qualified shortline railroad expenditures or qualified new rail infrastructure expenditures.
- Requires Caltrans to issue a credit certificate upon receipt of an application and upon determining that the taxpayer qualifies for the credit, stating the amount of allowed credit.
- Requires Caltrans to issue the credit on a first-come-first-served basis.
- Requires Caltrans to provide to the California Franchise Tax Board (FTB) a list of qualified taxpayers to whom a certificate has been issued and the tax credit amounts allocated to each qualified taxpayer each year, among other items.
- Requires Caltrans, for the new rail infrastructure credit, to additionally:
- Establish quarterly pre-application windows and to review applications received in the same window concurrently.
- Issue pre-certifications for qualified taxpayers who will have qualified new rail infrastructure expenditures.
- Include the maximum amount of allowed credit in the issued precertification.
- Give priority to applications for projects that provide critical rail access to industrial parks, ports, or economic development projects located adjacent to rail, or serve certain specified industries.
- Establish quarterly pre-application windows and to review applications received in the same window concurrently.
- Authorizes Caltrans to prescribe rules, guidelines, or procedures necessary to carry out these duties.
- States that the specific goals, purposes, and objectives of the tax credit are to:
- Improve the safety, reliability, and efficiency of shortline and regional rail service, consistent with the 2024 California State Rail Plan.
- Preserve and enhance rail access for existing industrial, agricultural, and commercial shippers, and facilitate new rail-served economic development.
- Support the diversion of freight movement from trucks to rail by preserving and expanding rail infrastructure capacity, thereby reducing highway congestion, pavement damage, and vehicle emissions.
- Support job retention and job creation in rail-dependent industries and associated supply chains through increased private capital investment in rail infrastructure.
- Improve the safety, reliability, and efficiency of shortline and regional rail service, consistent with the 2024 California State Rail Plan.
- States that the detailed performance indicators to be used for measuring whether the credit meets its objectives will include:
- The number of miles of railroad track improved, rehabilitated, or constructed as a result of projects receiving the credit.
- The number and type of rail infrastructure projects completed, including track, bridges, sidings, and spurs.
- Private capital investment leveraged by the tax credits, expressed as a ratio of private dollars invested per dollar of tax credit claimed.
- The number of miles of railroad track improved, rehabilitated, or constructed as a result of projects receiving the credit.
- Requires, in order to assess these performance indicators, that Caltrans, in collaboration with FTB, submit a report to the Legislature by June 30, 2028, and every June 30 thereafter that contains:
- A description of each project for which the credit was claimed, including project location and general scope of work, and, where applicable, the approximate number of track miles improved or constructed.
- The amount of qualified expenditures incurred and the amount of credit claimed.
- A description of each project for which the credit was claimed, including project location and general scope of work, and, where applicable, the approximate number of track miles improved or constructed.
- Contains a sunset of January 1, 2032, for the qualified shortline railroad expenditures credit.
- Contains a sunset of January 1, 2033, for the qualified new rail infrastructure expenditures credit.
COMMENTS:
- Purpose of the bill. According to the author, “Short line railroads are a vital part of California’s freight network, both for local industries and rural communities that depend on reliable rail access to reach statewide and global markets. The most recent California State Rail Plan underscores the importance of strengthening freight rail infrastructure to support economic growth, improve system resilience, and advance the state’s climate and equity goals. SB 1287 provides a targeted tax credit that helps short lines modernize aging track and bridges, which will help reduce truck traffic on highways, and ensure small and mid‑sized shippers have dependable, low‑emission freight options. This bill supports cost‑effective investments that keep goods moving efficiently while aligning with California’s long‑term vision for a cleaner, more integrated transportation system.”
- Short Line Railroads. Short line railroads are commonly defined as any Class II or Class III railroad. These classes are based on definitions set by the US Surface Transportation Board (STB) and classify railroads according to their annual operating revenue. As of January 2024, Class I is defined as revenue greater than roughly $1 billion annually, Class II is defined as revenue between roughly $47 million and $1 billion annually, and Class III is defined as revenue less than roughly $47 million annually, or any switching company or terminal company regardless of revenues.
Functionally, this equates to short line railroads being a specific type of railroad that operate relatively short-distance rail lines throughout the country. Their primary purpose is to handle the “first mile” and “last mile” of the freight rail network, serving as a distribution and feeder system for the overall freight rail network. Unlike the larger Class I rail operators which run expansive interstate rail operations, short lines typically focus on providing access to smaller markets and moving goods between origin points, processing points, and final points of sale. As such, a single short line train can be carrying goods as varied as timber and flatscreen TVs.
In general, short line rail is an efficient form of freight transportation. Each short line freight container can transport a load equivalent to three to five standard semitrucks. Furthermore, a single gallon of diesel fuel can move one ton of freight over 450 miles via rail, translating to a 75% reduction in greenhouse gas emissions as compared to trucking.[1] Overall, short line rail thus provides broad societal benefits, not only by providing connections between local industries and the national rail network, but also by helping to lower emissions, relieve highway congestion, and reduce wear on publicly funded roads.
Short line rail is particularly important in California. According to the California Public Utilities Commission (CPUC), although there are no Class II operators in the state, California is home to 24 Class III railroads. Collectively these short lines operate over 1,200 miles of rail in the state, representing roughly a third of the state’s rail network. - Maintaining rail infrastructure. Like with all rail, maintaining the physical rail infrastructure is one of the most important, and hardest, tasks for short line railroads. Many short line railroads initially acquired their rail from Class I railroads who no longer saw economic benefit in operating the lines themselves. As such, many short lines are in possession of aging and outdated infrastructure, sometimes dating to as far back as the early 20th, or even 19th, century. Thus, most short lines are faced with the need to not only upkeep their existing infrastructure, but also to update it to keep pace with the increasing weights and speeds utilized by the Class I operators.
For example, most short line railroads currently have rails that are designated as Class 1 quality. Not to be confused with the classification of the rail operators, this classification is set by the Federal Railroad Administration (FRA) and aims to describe overall track quality, taking into account rail weight, condition, signaling capability, and the number of grade crossings across a line. These classes range from Class 1, which is the lowest, to Class 6, which is the highest. The primary consequence of these ratings is that they dictate the speed at which trains can operate. Class 1, which makes up the majority of short line rail, is limited to speeds of 10 miles per hour. Currently, short lines are interested in upgrading to Class 2 rail, which would permit speeds of 25 miles per hour.
Beyond rail upgrades, short lines also face issues maintaining and upgrading other parts of their infrastructure. These include bridges, tunnels, and other crossings utilized by their lines, as well as their locomotives themselves. Most short lines primarily operate the oldest, and thus least fuel efficient, locomotives in use today. Not only does this decrease efficiency and increase operations cost, but can make it difficult to comply with emissions and other environmental regulations.
Addressing any of these infrastructure issues, be they rail, crossings, or locomotives, can be very costly. This makes it particularly difficult for short lines, often operating on tight margins, to meaningfully address these problems. Although Class III railroads, which all short lines in California are, are defined as having annual revenues of up to $47 million, the average annual revenue of short lines in California is only $6 million. Furthermore, according to the short lines, on average 75% of all revenue is used to support operations, leaving little left over for repairs and infrastructure investments.
Overall, this leaves a significant gap between what the short lines need and what they are able to address. Indeed, writing as the sponsors of the bill, the California Short Line Railroad Association writes, “Many short line operators face ongoing challenges maintaining and upgrading aging infrastructure due to the significant costs associated with track rehabilitation, bridge repairs, and other essential improvements. Without support, many of these lines cannot accommodate modern railcars, operate at higher speeds, or provide the level of service that California’s shippers require.” - Short Line Railroad Improvement Program. In an effort to address these funding challenges, in 2019 the Legislature passed SB 87 (Hurtado, Chapter 32, Statutes of 2019), which created the Short Line Railroad Improvement Program (SLRIP). This program, operated by the California Transportation Commission (CTC), included a one-time appropriation of $7.2 million from the Trade Corridors Improvement Fund (TCIF). SLRIP was designed to fund projects such as railroad reconstruction, maintenance, upgrade, or replacement for short line rail infrastructure. Class III railroads were eligible to apply, but had to do so with either Caltrans or a regional transportation planning agency acting as a project sponsor. Furthermore, all projects had to be matched with at least 30% private funds.
Ultimately, the program received eight applications and dispersed roughly $6.5 million in funding. These projects were dispersed across the state and were roughly evenly split between track repair and upgrades, and bridge maintenance. All projects that applied were fully funded. Although widely supported by the industry, short line railroads did note that the requirement for partnering with a sponsoring agency limited the types and locations of projects that could be submitted. - Short Line Rail Improvement Plan. As part of SLRIP, Caltrans was directed to analyze the needs of short line railroad operators across California. The goal of this study was to investigate how short line rail is supported in other states and make recommendations on strategies to support short line rail operators in the state and improve the efficiency of their operations. This report, the Short Line Rail Improvement Plan (SLIP), was released in 2019.[2] SLIP contained an analysis of the state of short line rail in California and conducted an extensive survey of short line operators in the state.
Overall, the report validated the needs reported by short line rail operators. Two-thirds of the short lines surveyed indicated that track condition and infrastructure rehabilitation and maintenance were high importance issues. Only “identifying new business opportunities” ranked higher in this regard. Additionally, the state’s short lines collectively identified roughly $140 million in infrastructure and equipment needs. These projects ranged from $500,000 to add 2,500 feet of new track to alleviate rail congestion, to $6 million to upgrade to lower emission locomotives, to $30 million to fully upgrade 60 miles of track to Class 2 rail.
Finally, SLIP outlined three potential strategies for further supporting short line railroads. These were a tax credit, a competitive grant program, and a loan program. - Short line support across the country. SB 1287 seeks to implement a tax credit to support short line railroads. Specifically, the bill would offer a 50% tax credit for both maintenance of short line rail infrastructure and the construction of new short line rail infrastructure. The maintenance credit would be capped at $5,000 per mile of track owned by a short line operator, and the new infrastructure credit would be capped at $1,000,000 per project. Each credit comes with additional restrictions, such as the amount of aggregate credit available every year, the time the credit will be available, and what sort of projects the credits can be claimed for.
Not only is this broadly similar to the first strategy recommended by SLIP, but it also mirrors other tax credits that exist across the country. At the federal level, the first short line railroad tax credit was enacted in 2005. That credit was extended and altered several times until it was eventually made permanent in 2020. Under the current rules it is a 40% credit capped at $3,500 per mile of track owned. The credit can be claimed for any project undertaken by a short line rail operator that invests in track and bridge improvements. Currently, industry groups are lobbying the federal government to increase the cap to $6,100 per mile and index the cap to inflation moving forward.
Over the past several years many states have also considered or taken up similar versions of this credit. Although the exact credit amounts and types of qualified projects vary from state to state, generally these programs follow the same contour as the federal credit and the credit proposed by SB 1287. States that currently have such a credit include Alabama, Arkansas, Florida, Georgia, Indiana, Kansas, Kentucky, Minnesota, Mississippi, Nebraska, Oklahoma, and Oregon. At least three other states, including Illinois, Missouri, and West Virginia are also currently considering a similar measure.
The second strategy suggested by SLIP was to implement a competitive grant program, like SLRIP. Currently however, no such program like this exists in California. The closest is TCEP, administered by CTC. TCEP is designed to provide funding for infrastructure improvements across the state in important trade corridors, which would theoretically include short line railroads. However, recent awards have generally benefited larger corridors most commonly used by Class I’s, with very little of the money going to projects relevant to short lines.
Outside of California, several other states have pursued grant programs to support short line rail. These states include several states that have implemented tax credits as well. Currently, states with short line rail grant programs include Florida, Idaho, Illinois, Iowa, Kansas, Maine, Maryland, Minnesota, New Jersey, New York, North Carolina, Ohio, Pennsylvania, Virginia, Washington, and Wisconsin. - Tax credit or grant program or neither? The key question surrounding SB 1287 is what form, if any, state support to the short line railroads should take. It is worth considering if the state should be directly supporting for-profit rail companies. However, given the importance of short lines to the overall rail network and the movement of key goods, both the federal government and many states across the country have decided to invest in these companies.
The next question is what form should this support take? SLIP offered multiple strategies for investing in short line railroads. The two primary recommended strategies were tax credits and grant programs. While each ultimately comes at a direct cost to the state, each strategy has its own pros and cons. As discussed above, both strategies are widely used across the country.
Tax credits, by their nature, require companies to put forward their own funds to invest in projects before claiming the benefit. This also reduces the barrier to entry, allowing companies to identify the projects of highest importance to them. However, the lack of competition and the first-come-first-served nature of the tax credit also creates the potential that better resourced companies that can more quickly initiate projects will disproportionately benefit from the funds. Making note of these issues, the California Tax Reform Association, writing in opposition, states “We do not believe that the use of tax credits is the appropriate way to further the development of short-line railroads. Rather...a direct grant program, authorized through the budget process, is less complex and likely to be more helpful.”
Competitive grants do eliminate some of these issues by allowing an outside agency to select which projects will receive funding. This process also allows the state to have greater control over exactly how taxpayer dollars are spent on these projects. However, the increased overhead of administering the program increases costs. Furthermore, the competitive process slows down implementation and delays the distribution of funds.
Finally, it is worth noting that SLIP also highlighted a third strategy of targeted loan programs. However, these come with unique challenges regarding the repayment of funds that generally make them a less attractive option. To the extent they are implemented across the country, they are generally done alongside grant programs. - Who should manage the reporting? The second question regarding SB 1287 has to do with the agency tasked with enforcing the Section 41 requirement. This is a special requirement of all tax credits in California which says the enacting legislation must specify the specified goals, purposes, and objectives that the credit will achieve. As part of this, data collection requirements for detailed performance indicators to measure these objectives must be described, and a specific state agency must be tasked with collecting and remitting this data.
SB 1287 states that the performance indicators to be measured for this tax credit include the number of miles of railroad track worked on as a result of the credit, the number rail infrastructure projects completed, and the amount of private capital investment leveraged by the tax credits. To assess these indicators, SB 1287 states that a report should be provided to the Legislature annually that contains a description of each project for which the credit was claimed and the amount of qualified expenditures incurred, and the amount of credit claimed.
Based on these requirements, SB 1287 specifies Caltrans as the responsible agency. This is due to Caltrans’ previous involvement in the implementation of SLRIP and compilation of SLIP. Caltrans has expressed concern about having the requisite experience working with the short line railroads to act as the Section 41 agency, however it is unclear what other agency would be best suited for this role. For instance, although CTC was also heavily involved with SLRIP and currently administers programs like TCEP, they lack the required in-house expertise to properly administer SB 1287. Furthermore, other agencies like FTB or CPUC do not have a history of working with the short line rail operators. - Double Referral. This bill was double referred to the Senate Revenue and Taxation Committee where it passed out on a 5-0 vote on April 8, 2026.
Related/Previous Legislation:
SB 667 (Archuleta, 2025) – Would require certain railroads, including those operating at speeds above 10 miles per hour, to install wayside detector systems. This bill is pending in the Assembly.
SB 87 (Hurtado, Chapter 32, Statutes of 2019) – Created a competitive funding program for short line railroad infrastructure projects and included a one-time appropriation of $7.2 million for the program from TCIF.
AB 1397 (Burke, 2019) – Would have created a 50% tax credit for short line railroads for reconstruction or replacement projects, capped at $3,500 per mile. This bill was held in Assembly Revenue and Taxation Committee.
AB 2658 (Conway, 2010) – Would have required the California Business, Transportation, and Housing Agency to prepare a five-year Short Line Commercial Rail Haul Connectivity Plan for the state, due on September 1, 2012 and every five years thereafter. This bill was held in Assembly Transportation Committee.
AB 1093 (Strom-Martin, 1999) – Would have created the Short Line Railroad Improvement Account in the State Transportation Fund to fund grants to short line railroads, including for capital improvement and rehabilitations projects. This bill was vetoed by the Governor.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
POSITIONS: (Communicated to the committee before noon on Wednesday,
April 15, 2026.)
SUPPORT:
California Short Line Railroad Association (Sponsor)
Genesee & Wyoming Railroad Services, INC. (Sponsor)
Arizona & California Railroad Company
Association of California Egg Farmers
California Grain & Feed Association
California Northern Railroad Company
Central Oregon & Pacific Railroad INC.
Central Valley Ag Group
City of Oakdale
Huron Transfer
JS West and Companies
Pacific Egg & Poultry Association
Patriot Rail
Quality Transport, INC & Truck-rail Handling, INC
San Diego & Imperial Valley Railroad Company, INC.
San Joaquin Valley Policy Council
Sierra Northern Railway
Titan Terminal and Transport
Tuolumne County Transportation Council
Ventura County Railroad Company
Ventura Transfer Company
OPPOSITION:
California Tax Reform Association
-- END –
SENATE COMMITTEE ON REVENUE AND TAXATION
Senator Jerry McNerney, Chair
2025 - 2026 Regular
Bill No: | SB 1287 | Hearing Date: | 4/8/26 |
Author: | Hurtado | Tax Levy: | Yes |
Version: | 2/20/26 | Fiscal: | Yes |
Consultant: | Summers | ||
Personal Income Tax Law: Corporation Tax Law: credits: shortline railroad expenditures and railroad infrastructure
Authorizes credits against the Personal Income and Corporate Taxes for Class II or III shortline railroads in an amount equal to 50% of the qualified shortline railroad expenditures and 50% of the qualified new rail infrastructure expenditures.
Background
Tax expenditures. California law allows various income tax credits, deductions, exemptions, and exclusions. The Legislature enacts such tax incentives to compensate taxpayers for incurring certain expenses, such as child adoption, or to influence certain behavior, such as charitable giving. The Legislature uses tax incentives to encourage taxpayers to do something they would otherwise not do, but for the tax credit. The Department of Finance is required to annually publish a list of tax expenditures, which currently total around $94.2 billion per year.
Credits. Tax credits reduce the amount of tax owed by a taxpayer on a dollar-for-dollar basis. Credit amounts that exceed the taxpayer’s current tax year liability can either be refunded to the taxpayer or carried forward to reduce tax in future years. However, except for the Earned Income Tax Credit, the Young Child Tax Credit, the Foster Youth Tax Credit, and the Motion Picture and Television Production Credit, all credits against California Personal Income and Corporation Tax are nonrefundable.
Shortline railroads. Class II and Class III railroads, commonly referred to as short line railroads, are the “first-mile, last-mile” of the freight rail network. According to the California Public Utilities Commission, there are two Class I railroads, no Class II railroads, and 24 Class III railroads in California.[1] Short line railroads link communities to the broader national rail system and serve farmers, miners, energy producers, port facilities, grain elevators, and countless other businesses that rely on efficient, reliable rail service to move goods to local and international markets. Shortline railroads incur ongoing maintenance costs and are investing in infrastructure modernization to improve energy efficiency, among other initiatives.
IRC 45G Railroad Track Maintenance Credit. Federal law provides a 40% business tax credit for qualified railroad track maintenance expenditures paid or incurred by an eligible taxpayer during the taxable year. An eligible taxpayer means any Class II or Class III railroad, and any person who transports property using the rail facilities of a Class II or Class III railroad or who furnishes railroad-related property or services to a Class II or Class III railroad. The credit is limited to $3,500 times the number of miles of railroad track (1) owned or leased by an eligible taxpayer as of the close of its taxable year. California does not conform to IRC 45G for state tax law purposes.
State grant program. In 2019, the Legislature enacted the Short-Line Infrastructure Improvement Act, requiring the California Transportation Commission (CTC) to create a competitive funding program for short-line railroad infrastructure projects (SB 87, Hurtado). SB 87 included a one-time appropriation of $7.2 million from the Trade Corridors Improvement Fund for the program. CTC subsequently created the Short-Line Railroad Improvement Program to fund projects such as railroad reconstruction, maintenance, upgrade, or replacement for short-line rail infrastructure. Grant funds were limited to projects submitted by the Department of Transportation (DOT), regional transportation planning agencies (RTPAs), or Class III railroads, if DOT or an RTPA sponsored their project. The CTC awarded project funding amounts according to the following limits: the grant funding cannot exceed 50% of the total project cost, at least 30% of the total project cost must come from nongovernmental sources, and funding to an individual project cannot exceed 25% of the total funding available in a fiscal year.
The author wants to help shortline railroads invest in their infrastructure by authorizing tax credits for maintenance and new infrastructure.
Proposed Law
Senate Bill 1287 enacts the Shortline Railroad Modernization Act of 2026, which would authorize two new credits against both the personal income and corporate tax for taxable years beginning in 2026. The first credit is for Class II or III shortline railroads in an amount equal to 50% of the “qualified shortline railroad expenditures” and the second is for “qualified new rail infrastructure expenditures”.
Regarding the maintenance credits for “qualified shortline railroad expenditures,” specifies:
- “Qualified shortline railroad expenditures” include costs paid or incurred for railroad infrastructure maintenance and capital improvements.
- The taxpayer must have expenditures certified by DOT to claim a credit.
- The certified credit amount for any specific taxpayer cannot exceed $5,000 multiplied by the number of miles of railroad track owned or leased within the state by the taxpayer at the close of the taxable year for which the credit is claimed.
- Specifies that the aggregate amount of credits that may be allocated in a fiscal year for the maintenance credits shall not exceed seven million dollars ($7,000,000).
Regarding the new infrastructure credits for “qualified new rail infrastructure expenditures,” specifies:
- “Qualified new rail infrastructure expenditures” means the costs paid or incurred for a new rail infrastructure project.
- The taxpayer must have expenditures for the project precertified by DOT, and the project must commence within 12 months of the issuance of a credit precertification letter.
- The taxpayer must have their expenditures certified by DOT at the conclusion of the project to be issued a credit certification.
- The credit amount certified by DOT shall be limited to $1,000,000 per new rail infrastructure project completed in the taxable year for which the credit is claimed.
- The aggregate amount of credits that may be allocated in a fiscal year for the new rail infrastructure credit shall not exceed $10,000,000.
Regarding both the maintenance credit and the new rail infrastructure credit, specifies:
- Unallocated credits may be carried forward to future fiscal years for allocation.
- The taxpayer must submit applications for precertification and certification in the form and manner prescribed by DOT to be allocated a credit.
- The credit is allowed for the taxable year in which DOT issues the credit certification.
- Excess credit claimed to be carried to the following taxable year, and succeeding five taxable years, if necessary, until the credit has been exhausted.
- Allocated credits follow specific procedures when assigned or distributed.
The bill also defines several terms and contains findings and declarations to comply with Section 41 of the Revenue and Taxation Code.
State Revenue Impact
Pending.
Comments
1. Purpose of the bill. According to the author, “Short line railroads are a vital part of California’s freight network, both for local industries and rural communities that depend on reliable rail access to reach statewide and global markets. The most recent California State Rail Plan underscores the importance of strengthening freight rail infrastructure to support economic growth, improve system resilience, and advance the state’s climate and equity goals. SB 1287 provides a targeted tax credit that helps short lines modernize aging track and bridges, which will help reduce truck traffic on highways, and ensure small and mid sized shippers have dependable, low emission freight options. This bill supports cost effective investments that keep goods moving efficiently while aligning with California’s long term vision for a cleaner, more integrated transportation system.”
2. “Windfall” or “but for” tax benefit? Tax expenditures produce two different outcomes. The first outcome is a “windfall,” in which the tax expenditure rewards behavior that would have occurred regardless of the tax benefit. The second outcome is a “but for tax benefit,” where a particular activity would not have occurred without the incentive created by the tax expenditure. Here, SB 1287’s shortline-maintenance credit likely would be a windfall, because the bill covers many baseline maintenance items such as rail, tie plates, switches, ballast, subgrade, bridges, sidings, safety barriers, and crossing signals that at least some shortline rails would have to repair or replace anyway to keep service operating. On the other hand, the bill offers a cost-share-like arrangement for new infrastructure that may not have been prioritized, but for the credit. Therefore, this credit may serve as a partial but-for tax benefit because it could move some deferred or otherwise unfunded shortline rail projects forward.
3. Revenue loss. Existing tax law provides various credits, deductions, exclusions, and exemptions for certain taxpayers. By authorizing credits against personal income tax, SB 1287 will result in the State General Fund receiving less revenue. As a result, the state will have to reduce spending or increase taxes to offset the loss.
4. Precedent. If the Legislature authorizes tax credits for capital infrastructure maintenance and improvements for private shortline rail companies, why should it not extend the same treatment for Class I railroads, the trucking industry, or air carriers? This may lead to a slippery slope where other industries are authorized credits for capital infrastructure maintenance and improvements, thereby eroding the income tax base.
5. Fair? The maintenance credit is first-come, first-served; the new-infrastructure credit uses quarterly application windows and prioritizes projects that provide critical rail access to industrial parks, ports, adjacent economic development projects, and certain targeted sectors, such as value-added agriculture, advanced manufacturing, distribution/supply chain solutions, and sustainable manufacturing. The maintenance credit’s first-come, first-served certification structure is administratively simple but favors applicants with better advisors and faster filing capacity rather than those with the greatest need. The new infrastructure credit, while more administratively complex, can be viewed as fairer because of its quarterly application windows. However, it still favors certain industries and project types by design.
6. Short Line Rail Improvement Plan (SLIP). The DOT was expressly tasked with identifying scenarios to fund improved industrial access and more efficient short-line operations.[2] The plan found that California short lines reported more than $130 million in infrastructure needs. SLIP, among other suggestions, outlined a 50% per-mile credit model and noted that tax credits can encourage ongoing maintenance without forcing applicants into a competitive funding queue.
7. Keepin’ it classy. The federal Surface Transportation Board defines Class II and Class III for shortline railroad designations at 49 CFR 1201, 1-1. The regulation classifies carriers into three classes using revenue thresholds adjusted by the railroad revenue deflator formula.
- Class I carriers have annual carrier operating revenues of $900 million or more;
- Class II carriers have revenues of less than $900 million but more than $40.4 million; and
- Class III carriers have revenues of $40.4 million or less.
Additionally, Class III carriers include all switching, terminal companies, and all electric railway carriers, regardless of their operating revenues.
8. Who benefits? In addition to the credit’s financial benefit to shortline railroads, the state of California also stands to benefit: from increased operational efficiencies in shortline railroads. Because shortline railroads provide critical first-mile and last-mile connections to the national rail network, they preserve freight access for local industries and reduce reliance on trucks. As a result, one loaded shortline railcar displaces 3.6 truck trips, which helps lower emissions, relieve highway congestion, and reduce wear on publicly funded roads. According to the Short Line Railroad Association, without the credit, shortline carloads are projected to increase by 1% year over year. However, with the credit, the carload increase is expected to double to 2% year over year. By 2036, the credit would divert approximately 7.7 million additional truck miles compared to if it were not authorized.
9. Joining the party? In 2019, the Legislature considered AB 1397 (Burke), a shortline rail tax credit substantially similar to SB 1287’s maintenance credit. However, the measure failed to advance from the Assembly Revenue & Taxation Committee. Currently, at least 13 states have state tax credits aimed at short-line or Class II/III rail infrastructure: Alabama, Arkansas, Florida, Georgia, Indiana, Kansas, Kentucky, Minnesota, Mississippi, Nebraska, Oklahoma, Oregon, and South Carolina.
10. Section 41. Section 41 of the Revenue and Taxation Code requires any bill enacting a new tax expenditure to contain, among other things, specific goals, purposes, and objectives that the tax expenditure will achieve and detailed performance indicators, along with data collection and reporting requirements (SB 1335, Leno, 2014). A bill that would authorize a new gross income exclusion is exempt from the requirement that the bill contain detailed performance indicators and data collection reporting if the Legislature determines there is no available data to collect and report (AB 3289, Committee on Revenue and Taxation, 2024). To satisfy these requirements, SB 1287 states that its specific goals, purposes, and objectives are:
- Improving the safety, reliability, and efficiency of shortline and regional rail service, consistent with the 2024 California State Rail Plan.
- Preserving and enhancing rail access for existing industrial, agricultural, and commercial shippers, and facilitating new rail-served economic development.
- Supporting the diversion of freight movement from trucks to rail by preserving and expanding rail infrastructure capacity, thereby reducing highway congestion, pavement damage, and vehicle emissions.
- Supporting job retention and job creation in rail-dependent industries and associated supply chains through increased private capital investment in rail infrastructure.
The detailed performance indicators include: the number of miles of railroad track improved, rehabilitated, or constructed as a result of projects receiving the credit; the number and type of rail infrastructure projects completed, including track, bridges, sidings, and spurs; and the private capital investment leveraged by the tax credits, expressed as a ratio of private dollars invested per dollar of tax credit claimed. The data used to determine whether the tax credits are meeting the specified goals includes a description of each project for which a credit was claimed, the amount of qualified expenditures incurred, and the amount of credit claimed. As introduced, the bill does not assign an agency to report on the goals and performance indicators.
11. Double-referred. The Senate Rules Committee ordered a double referral for SB 1287: first to the Committee on Revenue and Taxation, and second to the Committee on Transportation.
12. Committee amendments. In both credits, Committee Staff recommends amendments to:
- Exclude from qualified expenditures costs paid or incurred more than 12 months before the date the qualified taxpayer submitted their application for credit certification.
- Require that qualified expenditures are only for unreimbursed costs and exclude any cost that was used as a basis for a federal or state credit or grant.
- Remove the provisions pertaining to credit distribution and assignment.
- Authorize that ability to sell the credits to unrelated persons.
- Require that any state deduction or credit be reduced if the same qualified expenditure is used for the purposes of claiming the credit authorized by this act.
- Require additional information in the applications for credit pre-certification and certification necessary for DOT and the FTB to calculate credit amounts and determine if a taxpayer meets the criteria of a “qualified taxpayer.”
- Authorize the FTB to disallow a credit if the taxpayer does not meet the required criteria to claim the credit.
- Assign DOT as the agency for the Section 41 report and require that they submit their report, in collaboration with the FTB, to the legislature annually.
- Sunset the credits after five years.
- Make other technical amendments.
In the credit for “qualified shortline railroad expenditures”, amendments to:
- Authorize the credits for tax years beginning in 2027, which is the first year taxpayers could receive a credit certification from DOT for “qualified shortline railroad expenditures” and claim a credit.
- Exclude from the definition of “qualified taxpayer” owners or lessees of a rail siding, industrial spur, or industry track located on or adjacent to any railroad in California.
In the credit for “qualified new rail infrastructure expenditures”, amendments to:
- Authorize the credits for tax years beginning in 2028, which is the first year taxpayers could receive a credit certification from DOT for “qualified new rail infrastructure expenditures” for which they received a credit precertification letter and claim a credit.
- Require DOT to begin reviewing pre-certification applications in 2027.
- Require taxpayers to submit their expenditures for credit certification annually.
- Amend the definitions of “qualified taxpayer” to exclude Class I railroads.
Support and Opposition
(4/3/26)
Support: California Short Line Railroad Association (Co-Sponsor)
Genesee & Wyoming Railroad Services, Inc. (Co-Sponsor)
Central Valley Ag Group
City of Oakdale
Copper and Gold, LLC
Empire Mining Co., LLC
Garden Grove Chamber of Commerce
Harbor Association of Industry and Commerce
Huron Transfer, LLC
JS West and Companies
Patriot Rail
Redondo Beach Chamber of Commerce
Solano Economic Development Corporation
South Bay Association of Chambers of Commerce
Superior Soil Supplements
Titan Terminal and Transport
Truck-Rail Handling, Inc. & Quality Transport, Inc.
Tulare County Resource Management Agency
Tuolumne County Transportation Council
Ventura Transfer Company
Wilmington Chamber of Commerce
Opposition: California Tax Reform Association
California Teachers Association
-- END --
Discussed in Hearing
Senate Standing Committee on Transportation
Senate Standing Committee on Revenue and Taxation
Bill Author
Bill Co-Author(s):