SB 1375: California Environmental Quality Act: exemption: urban intermodal rail station project.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2026-09-30
Current Status:
Passed
(2026-09-30: Chaptered by Secretary of State. Chapter 1030, Statutes of 2026.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law exempts from CEQA a public project for the improvement, institution, or increase of passenger rail service, including the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities that will be exclusively used by zero-emission trains or specified rolling stock or locomotives, as provided.
This bill would exempt from CEQA, except as specified, a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets specified conditions, including, among other requirements, a requirement for compliance with various environmental laws and for the adoption of a plan for how any displacement from the project will be fully addressed, as provided. The bill would require a lead agency, if it determines that a project is not subject to CEQA pursuant to this exemption, and it determines to carry out the project, to file a notice of exemption with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located, as provided. The bill would permit exemption only for projects for which a notice of exemption is filed before January 1, 2032. Because a lead agency would be required to determine the applicability of this exemption, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law exempts from CEQA a public project for the improvement, institution, or increase of passenger rail service, including the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities that will be exclusively used by zero-emission trains or specified rolling stock or locomotives, as provided.
This bill would exempt from CEQA, except as specified, a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets specified conditions, including, among other requirements, a requirement for compliance with various environmental laws and for the adoption of a plan for how any displacement from the project will be fully addressed, as provided. The bill would require a lead agency, if it determines that a project is not subject to CEQA pursuant to this exemption, and it determines to carry out the project, to file a notice of exemption with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located, as provided. The bill would permit exemption only for projects for which a notice of exemption is filed before January 1, 2032. Because a lead agency would be required to determine the applicability of this exemption, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law exempts from CEQA a public project for the improvement, institution, or increase of passenger rail service, including the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities that will be exclusively used by zero-emission trains or specified rolling stock or locomotives, as provided.
This bill would exempt from CEQA, except as specified, a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets specified conditions, including, among other requirements, a requirement for compliance with various environmental laws and for the adoption of a plan for how any displacement from the project will be fully addressed, as provided. The bill would require a lead agency, if it determines that a project is not subject to CEQA pursuant to this exemption, and it determines to carry out the project, to file a notice of exemption with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located, as provided. The bill would permit exemption only for projects for which a notice of exemption is filed before January 1, 2032. Because a lead agency would be required to determine the applicability of this exemption, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law exempts from CEQA a public project for the improvement, institution, or increase of passenger rail service, including the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities that will be exclusively used by zero-emission trains or specified rolling stock or locomotives, as provided.
This bill would exempt from CEQA CEQA, except as specified, a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets specified conditions, including, among other requirements, a requirement for compliance with various environmental laws and for the adoption of a plan for how any displacement from the project will be fully addressed, as provided. The bill would require a lead agency, if it determines that a project is not subject to CEQA pursuant to this exemption, and it determines to carry out the project, to file a notice of exemption with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located, as provided. The bill would permit exemption only for projects for which a notice of exemption is filed before January 1, 2032. Because a lead agency would be required to determine the applicability of this exemption, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law exempts from CEQA a public project for the improvement, institution, or increase of passenger rail service, including the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities that will be exclusively used by zero-emission trains or specified rolling stock or locomotives, as provided.
This bill would exempt from CEQA a public program for the modernization of Diridon Station in the City of San Jose, including, but not limited to, the track, platform, station, public plaza or realm, roadway crossing and access improvements, and intermodal facilities and connections. public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets specified conditions, including, among other requirements, a requirement for compliance with various environmental laws and for the adoption of a plan for how any displacement from the project will be fully addressed, as provided. Because a lead agency would be required to determine the applicability of this exemption, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Diridon Station Program in the County of Santa Clara.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law exempts from CEQA a public project for the improvement, institution, or increase of passenger rail service, including the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities that will be exclusively used by zero-emission trains or specified rolling stock or locomotives, as provided.
This bill would exempt from CEQA a public program for the modernization of Diridon Station in the City of San Jose, including, but not limited to, the track, platform, station, public plaza or realm, roadway crossing and access improvements, and intermodal facilities and connections. Because a lead agency would be required to determine the applicability of this exemption, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Diridon Station Program in the County of Santa Clara.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law establishes the State Park and Recreation Commission consisting partly of 9 members appointed by the Governor, subject to confirmation by the Senate. Existing law specifies that each appointed member serves a 4-year term, except as provided. Existing law requires the commission to perform certain actions regarding the state park system. Existing law provides that, in case of a vacancy, the appointment to fill the vacancy is for the remainder of the unexpired term.This bill would make nonsubstantive changes to this latter provision.Existing law establishes the State Park and Recreation Commission consisting partly of 9 members appointed by the Governor, subject to confirmation by the Senate. Existing law specifies that each appointed member serves a 4-year term, except as provided. Existing law requires the commission to perform certain actions regarding the state park system. Existing law provides that, in case of a vacancy, the appointment to fill the vacancy is for the remainder of the unexpired term.
This bill would make nonsubstantive changes to this latter provision.
The Legislature finds and declares all of the following:
(a)Urban, intermodal rail stations are critical hubs within the statewide rail network.
(b)Due to growth in transit-oriented communities and new and increased transit and rail services, existing stations require modernization to meet capacity needs and to offer a high-quality, seamless passenger experience.
(c)The modernization of these stations promotes a mode shift from private automobile travel to public transportation and supports dense, walkable, transit-oriented development in the surrounding station district that reduces vehicle miles traveled and greenhouse gas emissions, with modernization projects largely occurring on previously disturbed urban lands.
SEC. 2.Section 21080.76 is added to the Public Resources Code, to read:21080.76.(a)Except as provided in paragraph (8), this division does not apply to a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets the following conditions:
(1)The project primarily modernizes and expands existing station facilities and rail infrastructure to improve operational efficiency, passenger capacity, and intermodal connectivity, including changes to tracks, platforms, station facilities, public plazas or realms, safety barriers, noise barriers, sound barriers, roadway crossing and access improvements, intermodal connections and facilities, transit-oriented development, and the interface with adjacent development.
(2)All station passenger rail services exclusively use Tier 4 or cleaner rolling stock or locomotive engines that are zero emission or meet Tier 4 exhaust emissions standards, as provided in Section 1033.101 of Title 40 of the Code of Federal Regulations.
(3)The station is in an urbanized area and is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter or ozone at the time the lead agency files the notice of exemption.
(4)The majority of the station projects footprint is in an existing public right-of-way or on publicly owned property.
(5)The project complies with all applicable historic preservation measures, including Section 106 of the National Historic Preservation Act of 1966 (16 U.S.C. Sec. 470 et seq.).
(6)The project adopts a natural resource management plan or equivalent document that identifies what natural resources are present on the site and how environmental impacts affecting those natural resources will be avoided, reduced, and compensated for.
(7)The project complies with the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code, the Porter-Cologne Water Quality Control Act (Division 7 (commencing with Section 13000) of the Water Code), and all applicable natural resource protection laws.
(8)The lead agency provides notice to and consults with California Native American tribes that are traditionally and culturally affiliated with the geographic area of the proposed project as defined by the list maintained by the Native American Heritage Commission, in accordance with Sections 21080.3.1, 21080.3.2, 21082.3, 21084.2, and 21084.3. The consult described in this paragraph does not need to include a consultation relating to the type of environmental review required.
(9)The project adopts and implements a construction impact and mitigation plan, specifying mechanisms to reduce construction-related impacts to below state and local requirements and communicate proactively and responsively with the community.
(10)The project adopts a plan to fully address any displacement from the project consistent with federal and state relocation laws, including a plan to replace any lost housing units through new market-rate and affordable housing.
(11)The plan includes specific commitments to expanding tenant education resources and offering tenants subject to relocation by the project access to legal counsel.
(12)The local land use authority adopts an affordable housing implementation plan that prioritizes the production of new affordable housing units, preservation of affordable homes, and protection of vulnerable residents from displacement to further plan for and address displacement. The plan may be citywide or for a specific area covering the project.
(b)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to carry out that project, the lead agency shall file a notice of exemption with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located in the manner specified in Section 21152.
(c)(1)Exemption under this section is permitted only for projects for which a notice of exemption is filed pursuant to this section before January 1, 2032.
(2)Notwithstanding paragraph (1), a lead agency for a project for which a notice of exemption is filed before January 1, 2032, may file additional notices as required by this division on or after January 1, 2032.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)Urban, intermodal rail stations are critical hubs within the statewide rail network.
(b)Due to growth in transit-oriented communities and new and increased transit and rail services, existing stations require modernization to meet capacity needs and to offer a high-quality, seamless passenger experience.
(c)The modernization of these stations promotes a mode shift from private automobile travel to public transportation and supports dense, walkable, transit-oriented development in the surrounding station district that reduces vehicle miles traveled and greenhouse gas emissions, with modernization projects largely occurring on previously disturbed urban lands.
SEC. 2.Section 21080.76 is added to the Public Resources Code, to read:21080.76.(a)Except as provided in paragraph (8), this division does not apply to a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets the following conditions:
(1)The project primarily modernizes and expands existing station facilities and rail infrastructure to improve operational efficiency, passenger capacity, and intermodal connectivity, including changes to tracks, platforms, station facilities, public plazas or realms, safety barriers, noise barriers, sound barriers, roadway crossing and access improvements, intermodal connections and facilities, transit-oriented development, and the interface with adjacent development.
(2)All station passenger rail services exclusively use Tier 4 or cleaner rolling stock or locomotive engines that are zero emission or meet Tier 4 exhaust emissions standards, as provided in Section 1033.101 of Title 40 of the Code of Federal Regulations.
(3)The station is in an urbanized area and is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter or ozone at the time the lead agency files the notice of exemption.
(4)The majority of the station projects footprint is in an existing public right-of-way or on publicly owned property.
(5)The project complies with all applicable historic preservation measures, including Section 106 of the National Historic Preservation Act of 1966 (16 U.S.C. Sec. 470 et seq.).
(6)The project adopts a natural resource management plan or equivalent document that identifies what natural resources are present on the site and how environmental impacts affecting those natural resources will be avoided, reduced, and compensated for.
(7)The project complies with the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code, the Porter-Cologne Water Quality Control Act (Division 7 (commencing with Section 13000) of the Water Code), and all applicable natural resource protection laws.
(8)The lead agency provides notice to and consults with California Native American tribes that are traditionally and culturally affiliated with the geographic area of the proposed project as defined by the list maintained by the Native American Heritage Commission, in accordance with Sections 21080.3.1, 21080.3.2, 21082.3, 21084.2, and 21084.3. The consult described in this paragraph does not need to include a consultation relating to the type of environmental review required.
(9)The project adopts and implements a construction impact and mitigation plan, specifying mechanisms to reduce construction-related impacts to below state and local requirements and communicate proactively and responsively with the community.
(10)The project adopts a plan to fully address any displacement from the project consistent with federal and state relocation laws, including a plan to replace any lost housing units through new market-rate and affordable housing.
(11)The plan includes specific commitments to expanding tenant education resources and offering tenants subject to relocation by the project access to legal counsel.
(12)The local land use authority adopts an affordable housing implementation plan that prioritizes the production of new affordable housing units, preservation of affordable homes, and protection of vulnerable residents from displacement to further plan for and address displacement. The plan may be citywide or for a specific area covering the project.
(b)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to carry out that project, the lead agency shall file a notice of exemption with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located in the manner specified in Section 21152.
(c)(1)Exemption under this section is permitted only for projects for which a notice of exemption is filed pursuant to this section before January 1, 2032.
(2)Notwithstanding paragraph (1), a lead agency for a project for which a notice of exemption is filed before January 1, 2032, may file additional notices as required by this division on or after January 1, 2032.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)Urban, intermodal rail stations are critical hubs within the statewide rail network.
(b)Due to growth in transit-oriented communities and new and increased transit and rail services, existing stations require modernization to meet capacity needs and to offer a high-quality, seamless passenger experience.
(c)The modernization of these stations promotes a mode shift from private automobile travel to public transportation and supports dense, walkable, transit-oriented development in the surrounding station district that reduces vehicle miles traveled and greenhouse gas emissions, with modernization projects largely occurring on previously disturbed urban lands.
SEC. 2.Section 21080.76 is added to the Public Resources Code, to read:21080.76.(a)Except as provided in paragraph (8), this division does not apply to a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets the following conditions:
(1)The project primarily modernizes and expands existing station facilities and rail infrastructure to improve operational efficiency, passenger capacity, and intermodal connectivity, including changes to tracks, platforms, station facilities, public plazas or realms, safety barriers, noise barriers, sound barriers, roadway crossing and access improvements, intermodal connections and facilities, transit-oriented development, and the interface with adjacent development.
(2)All station passenger rail services exclusively use Tier 4 or cleaner rolling stock or locomotive engines that are zero emission or meet Tier 4 exhaust emissions standards, as provided in Section 1033.101 of Title 40 of the Code of Federal Regulations.
(3)The station is in an urbanized area and is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter or ozone at the time the lead agency files the notice of exemption.
(4)The majority of the station projects footprint is in an existing public right-of-way or on publicly owned property.
(5)The project complies with all applicable historic preservation measures, including Section 106 of the National Historic Preservation Act of 1966 (16 U.S.C. Sec. 470 et seq.).
(6)The project adopts a natural resource management plan or equivalent document that identifies what natural resources are present on the site and how environmental impacts affecting those natural resources will be avoided, reduced, and compensated for.
(7)The project complies with the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code, the Porter-Cologne Water Quality Control Act (Division 7 (commencing with Section 13000) of the Water Code), and all applicable natural resource protection laws.
(8)The lead agency provides notice to and consults with California Native American tribes, tribes that are traditionally and culturally affiliated with the geographic area of the proposed project as defined by the list maintained by the Native American Heritage Commission, in accordance with Sections 21080.3.1, 21080.3.2, 21082.3, 21084.2, and 21084.3, that are traditionally and culturally affiliated with the geographic area of the proposed project as defined by the list maintained by the Native American Heritage Commission. 21084.3. The consult described in this paragraph does not need to include a consultation relating to the type of environmental review required.
(9)The project adopts and implements a construction impact and mitigation plan, specifying mechanisms to reduce construction-related impacts to below state and local requirements and communicate proactively and responsively with the community.
(10)The project adopts a plan to fully address any displacement from the project consistent with federal and state relocation laws, including a plan to replace any lost housing units through new market-rate and affordable housing.
(11)The plan includes specific commitments to expanding tenant education resources and offering tenants subject to relocation by the project access to legal counsel.
(12)The local land use authority adopts an affordable housing implementation plan that prioritizes the production of new affordable housing units, preservation of affordable homes, and protection of vulnerable residents from displacement to further plan for and address displacement. The plan may be citywide or for a specific area covering the project.
(b)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to carry out that project, the lead agency shall file a notice of exemption with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located in the manner specified in Section 21152.
(c)(1)Exemption under this section is permitted only for projects for which a notice of exemption is filed pursuant to this section before January 1, 2032.
(2)Notwithstanding paragraph (1), a lead agency for a project for which a notice of exemption is filed before January 1, 2032, may file additional notices as required by this division on or after January 1, 2032.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)Urban, intermodal rail stations are critical hubs within the statewide rail network.
(b)Due to growth in transit-oriented communities and new and increased transit and rail services, existing stations require modernization to meet capacity needs and to offer a high-quality, seamless passenger experience.
(c)The modernization of these stations promotes a mode shift from private automobile travel to public transportation and supports dense, walkable, transit-oriented development in the surrounding station district that reduces vehicle miles traveled and greenhouse gas emissions, with modernization projects largely occurring on previously disturbed urban lands.
SEC. 2.Section 21080.76 is added to the Public Resources Code, to read:21080.76.This (a)Except as provided in paragraph (8), this division shall does not apply to a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets the following conditions:
(a)(1)The project shall primarily modernize modernizes and expand expands existing station facilities and rail infrastructure to improve operational efficiency, passenger capacity, and intermodal connectivity, including changes to tracks, platforms, station facilities, public plazas or realms, safety barriers, noise barriers, sound barriers, roadway crossing and access improvements, intermodal connections and facilities, transit-oriented development, and the interface with adjacent development.
(b)The(2)All station passenger rail service will services exclusively use Tier IV 4 or cleaner rolling stock or locomotive engines. engines that are zero emission or meet Tier 4 exhaust emissions standards, as provided in Section 1033.101 of Title 40 of the Code of Federal Regulations.
(c)(3)The station is in an urban urbanized area and is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter or ozone at the time the exemption is applied for. lead agency files the notice of exemption.
(d)(4)The majority of the station projects footprint is in an existing public or publicly owned right-of-way. right-of-way or on publicly owned property.
(e)(5)The project complies with all applicable historic preservation measures, including Section 106 of the National Historic Preservation Act of 1966 (16 U.S.C. Sec Sec. 470 et seq.).
(f)(6)The project adopts a natural resource management plan or equivalent document that identifies what natural resources are present on the site and how environmental impacts affecting those natural resources will be avoided, reduced, and compensated for.
(g)(7)The project is in compliance complies with the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code, the Porter-Cologne Water Quality Control Act (Division 7 (commencing with Section 13000) of the Water Code), and all applicable natural resource protection laws.
(8)The lead agency provides notice to and consults with California Native American tribes, in accordance with Sections 21080.3.1, 21080.3.2, 21082.3, 21084.2, and 21084.3, that are traditionally and culturally affiliated with the geographic area of the proposed project as defined by the list maintained by the Native American Heritage Commission.
(h)(9)The project adopts and implements a construction impact and mitigation plan, specifying mechanisms to reduce construction-related impacts to below state and local requirements for construction-related impacts and communicate proactively and responsively with the community.
(i)(10)The project adopts a plan for how to fully address any displacement from the project will be fully addressed in line consistent with federal and state relocation laws, including a plan to replace any lost housing units through new market-rate and affordable housing.
(j)(11)The plan includes specific commitments to expanding tenant education resources and offering tenants subject to relocation by the project access to legal counsel.
(k)(12)The local land use authority adopts an affordable housing implementation plan that prioritizes the production of new affordable housing units, preservation of affordable homes, and protection of vulnerable residents from displacement to further plan for and address displacement. The plan may be citywide or for a specific area covering the project.
(b)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to carry out that project, the lead agency shall file a notice of exemption with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located in the manner specified in Section 21152.
(c)(1)Exemption under this section is permitted only for projects for which a notice of exemption is filed pursuant to this section before January 1, 2032.
(2)Notwithstanding paragraph (1), a lead agency for a project for which a notice of exemption is filed before January 1, 2032, may file additional notices as required by this division on or after January 1, 2032.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)Urban, intermodal rail stations are critical hubs within the statewide rail network.
(b)Due to growth in transit-oriented communities and new and increased transit and rail services, existing stations require modernization to meet capacity needs and to offer a high-quality, seamless passenger experience.
(c)The modernization of these stations promotes a mode shift from private automobile travel to public transportation and supports dense, walkable, transit-oriented development in the surrounding station district that reduces vehicle miles traveled and greenhouse gas emissions, with modernization projects largely occurring on previously disturbed urban lands.
SEC. 2.Section 21080.76 is added to the Public Resources Code, to read:21080.76.This division shall not apply to a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets the following conditions:
(a)The project shall primarily modernize and expand existing station facilities and rail infrastructure to improve operational efficiency, passenger capacity, and intermodal connectivity, including changes to tracks, platforms, station facilities, public plazas or realms, safety barriers, noise barriers, sound barriers, roadway crossing and access improvements, intermodal connections and facilities, transit-oriented development, and the interface with adjacent development.
(b)The station passenger rail service will exclusively use Tier IV or cleaner rolling stock or locomotive engines.
(c)The station is in an urban area and is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter or ozone at the time the exemption is applied for.
(d)The majority of the station projects footprint is in an existing public or publicly owned right-of-way.
(e)The project complies with all applicable historic preservation measures, including Section 106 of the National Historic Preservation Act of 1966 (16 U.S.C. Sec 470 et seq.).
(f)The project adopts a natural resource management plan or equivalent document that identifies what natural resources are present on the site and how environmental impacts affecting those natural resources will be avoided, reduced, and compensated for.
(g)The project is in compliance with the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code, the Porter-Cologne Water Quality Control Act (Division 7 (commencing with Section 13000) of the Water Code), and all applicable natural resource protection laws.
(h)The project adopts a construction impact and mitigation plan, specifying mechanisms to reduce to below state and local requirements for construction-related impacts and communicate proactively and responsively with the community.
(i)The project adopts a plan for how any displacement from the project will be fully addressed in line with federal and state relocation laws, including a plan to replace any lost housing units through new market-rate and affordable housing.
(j)The plan includes specific commitments to expanding tenant education resources and offering tenants subject to relocation by the project access to legal counsel.
(k)The local land use authority adopts an affordable housing implementation plan that prioritizes the production of new affordable housing units, preservation of affordable homes, and protection of vulnerable residents from displacement to further plan for and address displacement. The plan may be citywide or for a specific area covering the project.
SEC. 4.SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)The Diridon Station Program in the City of San Jose is the confluence of major rail and transit projects, including the Bay Area Rapid Transit Silicon Valley Phase II Extension, intercity and commuter rail, high-speed rail, light rail, and local, rapid, and intercity bus projects.
(b)Environmental review has already been completed for major transit projects and land use plans at and around Diridon Station, including, but not limited to, environmental review for the statewide high-speed rail project that environmentally cleared minimal changes to introduce high-speed rail tracks and platforms and ensure access to them.
(c)The integrated Diridon Station Program comprehensively designs for all rail and transit needs at the station, including, but not limited to, the statewide high-speed rail project, and seamless connections between modes.
(d)The modernized station will result in an integrated transit hub that advances environmental sustainability, creates new jobs, supports surrounding transit-oriented communities and homes, and catalyzes sustainable economic and community development.
SEC. 2.Section 21080.76 is added to the Public Resources Code, to read:21080.76.This division does not apply to a public program for the modernization of Diridon Station in the City of San Jose, including, but not limited to, the track, platform, station, public plaza or realm, roadway crossing and access improvements, and intermodal facilities and connections.
SEC. 3.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the necessity to integrate high-speed rail tracks and platforms, and ensure access to them, that were previously environmentally cleared by the California High-Speed Rail Authority, into the Diridon Station Program in the County of Santa Clara that comprehensively designs for all rail and transit needs at the station.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
SECTION 1.Section 533 of the Public Resources Code is amended to read:533.In case of a vacancy, the appointment to fill the vacancy shall be for the remainder of the unexpired term. All appointments of members made when the Legislature is not in session shall be subject to confirmation by the Senate at the next regular or special session of the Legislature.In case of any a vacancy, the appointment to fill the vacancy shall be for the remainder of the unexpired term. All appointments of members made when the Legislature is not in session shall be subject to confirmation by the Senate at the next regular or special session of the Legislature.
|
Date
|
Status
|
|---|---|
| Sep 30, 2026 | Chaptered by Secretary of State. Chapter 1030, Statutes of 2026. |
| Sep 30, 2026 | Approved by the Governor. |
| Aug 21, 2026 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 18, 2026 | Assembly amendments concurred in. (Ayes 40. Noes 0. Page 5515.) Ordered to engrossing and enrolling. |
| Aug 18, 2026 | Assembly amendments concurred in. (Ayes 40. Noes 0.) Ordered to engrossing and enrolling. |
| Aug 18, 2026 | Assembly amendments concurred in. (Ayes 39. Noes 0.) Ordered to engrossing and enrolling. |
| Aug 13, 2026 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 13, 2026 | Read third time. Passed. (Ayes 73. Noes 0. Page 6151.) Ordered to the Senate. |
| Aug 13, 2026 | Read third time. Passed. Ordered to the Senate. |
| Aug 6, 2026 | Ordered to third reading. |
| Aug 6, 2026 | Read third time and amended. |
| Aug 6, 2026 | Read second time. Ordered to third reading. |
| Aug 5, 2026 | From committee: Do pass. (Ayes 15. Noes 0.) (August 5). |
| Jul 2, 2026 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 2, 2026 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 13. Noes 0.) (June 22). |
| Jun 1, 2026 | Referred to Com. on NAT. RES. |
| May 20, 2026 | In Assembly. Read first time. Held at Desk. |
| May 19, 2026 | Read third time. Passed. (Ayes 39. Noes 0. Page 4354.) Ordered to the Assembly. |
| May 19, 2026 | Read third time. Passed. (Ayes 39. Noes 0.) Ordered to the Assembly. |
| May 12, 2026 | Read second time. Ordered to third reading. |
| May 11, 2026 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| May 4, 2026 | Set for hearing May 11. |
| Apr 30, 2026 | May 4 hearing postponed by committee. |
| Apr 24, 2026 | Set for hearing May 4. |
| Apr 22, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 12. Noes 0. Page 3985.) (April 21). Re-referred to Com. on APPR. |
| Apr 22, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 12. Noes 0.) (April 21). Re-referred to Com. on APPR. |
| Apr 16, 2026 | Read second time and amended. Re-referred to Com. on TRANS. |
| Apr 15, 2026 | From committee: Do pass as amended and re-refer to Com. on TRANS. (Ayes 7. Noes 0. Page 3900.) (April 15). |
| Apr 15, 2026 | From committee: Do pass as amended and re-refer to Com. on TRANS. (Ayes 7. Noes 0.) (April 15). |
| Apr 14, 2026 | Set for hearing April 21 in TRANS. pending receipt. |
| Apr 9, 2026 | Set for hearing April 15. |
| Apr 8, 2026 | Re-referred to Coms. on E.Q. and TRANS. |
| Mar 25, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Mar 4, 2026 | Referred to Com. on RLS. |
| Feb 23, 2026 | Read first time. |
| Feb 23, 2026 | From printer. May be acted upon on or after March 23. |
| Feb 20, 2026 | Introduced. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 18, 2026 | Unfinished Business SB1375 Cortese et al. Concurrence | Senate Floor |
Passed |
|
| Aug 13, 2026 | SB 1375 Cortese Senate Third Reading By Kalra | Assembly Floor |
Passed |
|
| Aug 5, 2026 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jun 22, 2026 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
|
| May 19, 2026 | Senate 3rd Reading SB1375 Cortese | Senate Floor |
Passed |
|
| Apr 21, 2026 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Transportation |
Passed |
|
| Apr 15, 2026 | Do pass as amended, but first amend, and re-refer to the Committee on [Transportation] | Senate Standing Committee on Environmental Quality |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Bay Area Council | ** Support | |
| Calfornia-nevada Conference of Operating Engineers | ** Support | |
| City of San Jose | ** Support | |
| City of San Jose (sponsor) | ** Support | |
| Diridon Station Steering Committee | ** Support | |
| Greenbelt Alliance | ** Support | |
| International Union of Operating Engineers, Cal-Nevada Conference | ** Support | |
| Metropolitan Transportation Commission | ** Support | |
| Peninsula Corridor Joint Powers Board (Caltrain) | ** Support | |
| San Jose Chamber of Commerce | ** Support | |
| San Jose Downtown Association | ** Support | |
| Santa Clara Valley Transportation Authority | ** Support | |
| Silicon Valley Bicycle Coalition | ** Support | |
| SPUR | ** Support | |
| Streets for All | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 1375 |
UNFINISHED BUSINESS
Bill No: SB 1375
Author: Cortese (D), et al.
Amended: 8/6/26
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 7-0, 4/15/26
AYES: Blakespear, Valladares, Allen, Dahle, Gonzalez, Hurtado, Menjivar
SENATE TRANSPORTATION COMMITTEE: 12-0, 4/21/26
AYES: Cortese, Strickland, Archuleta, Arreguín, Blakespear, Dahle, Gonzalez, Grayson, Richardson, Seyarto, Valladares, Wiener
NO VOTE RECORDED: Menjivar
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SENATE FLOOR: 39-0, 5/19/26
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Ochoa Bogh, Padilla, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
NO VOTE RECORDED: Niello
ASSEMBLY FLOOR: 73-0, 8/13/26 - See last page for vote
SUBJECT: California Environmental Quality Act: exemption: urban intermodal rail station project
SOURCE: Author
DIGEST:
This bill exempts from the California Environmental Quality Act (CEQA) a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets specified conditions.
Assembly Amendments
- of 8/6/26 add a filing deadline of January 1, 2032, after which additional projects could not use this exemption, and specify that the agency provides notice to and consults with California Native American tribes that are traditionally and culturally affiliated with the project area, as specified.
ANALYSIS:
Existing law:
- Requires under CEQA that a lead agency determines whether a project is exempt from CEQA, or if it must do an initial study to determine if a project will have significant effects on the environment. If a project has no effect on the environment or effects that can be mitigated, the lead agency prepares a negative declaration (ND) or mitigated ND (MND). If the project will have significant impacts, the lead agency prepares an environmental impact report (EIR) to evaluate and propose mitigation measures for any effects on the environment, including impacts or likely impacts to land, air, water, minerals, flora, fauna, ambient noise, and historic or aesthetic significance. (Public Resources Code (PRC) §§21000 et seq.)
- Establishes specific exemptions relating to railroads, including:
- Development, construction, or operation of a heavy maintenance facility or other maintenance facility for electrically powered high-speed rail, or passenger rail stations for the purpose of serving the high-speed rail meeting certain conditions. (PRC § 21080.70)
- Any railroad grade separation project that eliminates an existing grade crossing or reconstructs an existing grade separation. (PRC § 21080.13)
- A transit comprehensive operational analysis, transit route readjustment, or other transit agency route addition, elimination, or modification. (PRC § 21080.20(a)(B))
- The institution or increase of passenger or commuter services on rail or highway rights-of-way already in use, including modernization of existing stations and parking facilities. (PRC §21080(b)(10)).
- Facility extensions not to exceed four miles in length required to transfer passengers from or to exclusive public mass transit guideway or busway public transit services. (PRC §21080(b)(12)).
- A public project for the construction, operation, or repair of zero emission and near-zero powertrain vehicles, rail or cable cars, or rolling stock, among others. (PRC § 21080.25 (b)(5))
- A public project for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains or certified Tier 4 or cleaner rolling stock or locomotives in an existing right of way (ROW). (PRC § 21080.25 (b)(6)
- Development, construction, or operation of a heavy maintenance facility or other maintenance facility for electrically powered high-speed rail, or passenger rail stations for the purpose of serving the high-speed rail meeting certain conditions. (PRC § 21080.70)
This bill:
- Exempts from CEQA a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets the following conditions:
- The project primarily modernizes and expands existing station facilities and rail infrastructure to improve operational efficiency, passenger capacity, and intermodal connectivity, including changes to tracks, platforms, station facilities, public plazas or realms, safety barriers, noise barriers, sound barriers, roadway crossing and access improvements, intermodal connections and facilities, transit-oriented development, and the interface with adjacent development.
- The station passenger rail service will exclusively use Tier 4 or cleaner rolling stock or locomotive engines.
- The station is in an urbanized area and is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter or ozone.
- The majority of the station project's footprint is in an existing publicly owned right-of-way or on public property.
- The project complies with all applicable historic preservation measures, including Section 106 of the National Historic Preservation Act.
- The project adopts a natural resource management plan or equivalent document that identifies what natural resources are present on the site and how environmental impacts affecting those natural resources will be avoided, reduced, and compensated for.
- The project complies with the California Endangered Species Act, Chapter 6 of Division 2 of the Fish and Game Code, the Porter-Cologne Water Quality Control Act, and all applicable natural resource protection laws.
- The lead agency provides notice to and consults with California Native American tribes that are traditionally and culturally affiliated with the project area, as specified. Specifies that this tribal consultation does not need to include a consultation relating to the type of environmental review required.
- The project adopts and implements a construction impact and mitigation plan, specifying mechanisms to reduce construction-related impacts to below state and local requirements for and communicate proactively and responsively with the community.
- The project adopts a plan to fully address any displacement from the project consistent with federal and state relocation laws, including a plan to replace any lost housing units through new market-rate and affordable housing.
- The plan includes specific commitments to expanding tenant education resources and offering tenants subject to relocation by the project access to legal counsel.
- The local land use authority adopts an affordable housing implementation plan that prioritizes the production of new affordable housing units, preservation of affordable homes, and protection of vulnerable residents from displacement to further plan for and address displacement. The plan may be citywide or for a specific area covering the project.
- The notice of exemption is filed, as specified, before January 1, 2032.
Background
- Transportation and climate change. Emissions from the transportation sector, the state’s largest source of greenhouse gas (GHG) emissions, are still on the rise despite statewide GHG emission reduction efforts and increasingly ambitious targets. According to California Air Resources Board (CARB)’s GHG emission inventory, the transportation sector emissions have grown to 41% of California’s total emissions as of 2017. A 2018 Legislative Analyst’s Office report found that roughly 90% of the transportation sector’s emissions were from on-road sources – 69% passenger vehicles and 22% heavy-duty vehicles. Within the transportation sector, measures to reduce GHG emissions include requiring the use of low carbon fuels, cleaner vehicles, and strategies to promote sustainable communities, and improved transportation choices that reduce growth in the number of vehicle miles traveled (VMT).
CARB’s 2022 Scoping Plan scenario for achieving 85% GHG emission reductions by 2045 calls for a 25% reduction in VMT by 2030 and a 30% reduction in VMT by 2045. Mode shift – getting people out of their cars and onto public transit and active transportation – is an important component of success. For example, achieving these VMT targets through shifting to transit means California would need a 5 to 10 times ridership increase from pre-COVID levels by 2045.
- The A, B, C’s of CEQA. CEQA is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment. CEQA is enforced by civil lawsuits that can challenge any project’s environmental review.
Under CEQA, projects (unless they have a specific exemption) must undergo environmental analysis. This process starts with an initial study which determines what level of further environmental review is needed for a given project. If a project has no significant effects on the environment, or if those effects can be fully mitigated, the project can move forward with an ND or MND. If the initial study finds the project has potential significant effects on the environment, then a full EIR is conducted.
- CEQA exemptions for rail projects. There are numerous CEQA exemptions that could apply for rail projects, including CEQA exemptions for: facility extensions up to four miles long to transfer passengers to transit services, and public projects for the construction, operation, or repair of zero emission and near-zero powertrain vehicles, rail or cable cars. This includes two CEQA exemptions for rail facilities that were passed through the Legislature last year in SB 71 (Weiner, Chapter 742, Statutes of 2025) and SB 131 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2025). The relevant portions of these two policies do, briefly, the following:
SB 131 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2025) creates an exemption for construction, operation, or maintenance of high-speed rail projects that meet certain criteria, specifically that:
- The station is located within the resource study area of a previously certified environmental impact report prepared for a high-speed rail or passenger rail project
- The project incorporates all applicable mitigation measures identified in the previously certified environmental impact report.
SB 71 (Wiener, Chapter 742, Statutes of 2025) Creates a CEQA exemption for public projects for rail facilities for zero-emission and for near zero emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. To be eligible for this rail facility project, the project must be located entirely within an existing public right-of-way and in an urban area.
This CEQA exemption also applies to certified Tier 4 or cleaner rolling stock or locomotives, except that the exemption does not need to be in an urban area: instead, the project cannot be located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone.
- Diridon Station. According to the City of San José’s website on the project, “Diridon Station, a key transit hub at the western edge of Downtown San José, will be expanded and redesigned to address the region's future transit needs. A collaboration among five public agencies – City of San José, Caltrain, Santa Clara Valley Transportation Authority (VTA), California High-Speed Rail Authority (CHSRA), and Metropolitan Transportation Commission (MTC) (collectively the “Partner Agencies”)– is underway to develop a comprehensive plan for the station. This initiative aims to improve the station's integration with the surrounding area, positioning it as a catalyst for both economic and community development. The goal of the project is to increase transit capacity and service, facilitate seamless transfers, and create a safe, passenger-friendly station.”[1]
The project was begun in 2023 with a two-year “Business Case” phase to assess project alternatives. Following a decision made May of 2025, according to the City website, the Partner Agencies began environmental review on the project, which is expected to take approximately 3 to 4 years.
Comments
- Purpose of Bill. According to the author, “SB 1375 is a targeted, project specific measure that recognizes the extensive environmental review already completed for major transit projects and adopted land use plans in the Diridon Station area.
“This exemption applies only to the Diridon Station Modernization Program in San Jose and maintains full compliance with all other environmental laws and permitting requirements. Advancing this project is critical for the region, as the modernized station will deliver significant environmental and mobility benefits by supporting mode shift from automobiles, reducing greenhouse gas emissions, and strengthening major rail and transit connections. It will also spur transit-oriented housing, mixed use development and create thousands of good jobs. SB 1375 responsibly saves time and public funds while enabling timely delivery of a key statewide mobility, climate, and economic asset.”
- Diridon Station is not quite eligible for an exemption. As discussed above, the Legislature passed two new statutory CEQA exemptions for rail stations in 2025. SB 71 is for passenger rail stations for zero emission, near zero, and lower emission locomotives (Tier IV), and SB 131 is for high-speed rail stations. However, Diridon is not quite eligible for either of these exemptions.
Diridon station is not eligible for the CEQA exemption created in SB 131 because it does not meet the siting requirements for that bill. Diridon station is not eligible for the CEQA exemption created in SB 71 because it is not in the existing right-of-way of the station. Specifically, it deviates from the existing right-of-way only in some areas, with about 20% of the project falling outside of the existing right-of-way. Some of this 20% contains important existing structures. For example, a portion of the Diridon station project that is not within the existing right-of-way would cut through a market-rate housing development with more than 150 units. This issue would have been considered and open to public comment and mitigation measures if the project was fully in an existing right-of-way that had already undergone CEQA.
The guardrails in SB 1375 address this and many of the other outstanding impacts of the project that would typically be evaluated and mitigated under CEQA. For example, SB 1375 requires that the project applicant submit a plan that will identify how to fully mitigate impacts related to construction, and a plan for how any displacement from the project will be fully mitigated in line with federal and state relocation laws. This would include replacing any lost units through new market-rate and affordable housing, and specific commitments to provide assistance to residents facing displacement.
Additionally, the Diridon station project, while in an infill area, is also in an existing conservation easement and near a creek. The impacts of the project on the natural resources at the site would ordinarily be reviewed through CEQA, which could include mitigation measures. To ensure that all natural resources that might be impacted by the project, and that would have been considered under CEQA review, are protected, SB 1375 requires the project applicant to adopt a natural resource management plan or equivalent document to be eligible for the exemption. Natural resource management plans include identification of natural resources in an area, and plans to protect those resources, including avoiding impacts or mitigating impacts when necessary.
Finally, the Diridon station project will replace a historic stadium with a new one. Any impacts to historic structures under CEQA would be required to be evaluated and mitigated where possible. To protect the historic structure, the bill requires the project applicant to be in compliance with Section 106 of the National Historic Preservation Act of 1966.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
Negligible state costs.
SUPPORT: (Verified 8/14/26)
Bay Area Council
Calfornia-nevada Conference of Operating Engineers
City of San Jose
Diridon Station Steering Committee
Greenbelt Alliance
International Union of Operating Engineers, Cal-nevada Conference
Metropolitan Transportation Commission
San Jose Chamber of Commerce
San Jose Downtown Association
Santa Clara Valley Transportation Authority
Silicon Valley Bicycle Coalition
Spur
Streets for All
OPPOSITION: (Verified 8/14/26)
None received
ASSEMBLY FLOOR: 73-0, 8/13/26
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Boerner, Bryan, Calderon, Caloza, Carrillo, Castillo, Chen, Connolly, Davies, DeMaio, Dixon, Elhawary, Ellis, Fong, Gabriel, Garcia, Gipson, Jeff Gonzalez, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Johnson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Sanchez, Schiavo, Sharp-Collins, Solache, Soria, Stefani, Ta, Tangipa, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NO VOTE RECORDED: Alvarez, Berman, Bonta, Flora, Petrie-Norris, Schultz
Prepared by: Brynn Cook / E.Q. / (916) 651-4108
8/14/26 17:04:35
**** END ****
The Future of Diridon Station, City of San José. https://www.diridonsj.org/ Accessed 4/5/2026 ↑
SENATE THIRD READING
STR Bill Id:SB 1375
Author:(Cortese)
As Amended Ver:July 2, 2026
Majority vote
SUMMARY
Exempts from the California Environmental Quality Act (CEQA) a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets specified conditions.
Major Provisions
Exempts from CEQA a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets the following conditions:
- The project primarily modernizes and expands existing station facilities and rail infrastructure to improve operational efficiency, passenger capacity, and intermodal connectivity, including changes to tracks, platforms, station facilities, public plazas or realms, safety barriers, noise barriers, sound barriers, roadway crossing and access improvements, intermodal connections and facilities, transit-oriented development, and the interface with adjacent development.
- The station passenger rail service will exclusively use Tier 4 or cleaner rolling stock or locomotive engines.
- The station is in an urbanized area and is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter or ozone.
- The majority of the station project's footprint is in an existing publicly owned right-of-way or on public property.
- The project complies with all applicable historic preservation measures, including Section 106 of the National Historic Preservation Act.
- The project adopts a natural resource management plan or equivalent document that identifies what natural resources are present on the site and how environmental impacts affecting those natural resources will be avoided, reduced, and compensated for.
- The project complies with the California Endangered Species Act, Chapter 6 of Division 2 of the Fish and Game Code, the Porter-Cologne Water Quality Control Act, and all applicable natural resource protection laws.
- The lead agency provides notice to and consults with California Native American tribes that are traditionally and culturally affiliated with the project area, as specified. Specifies that this tribal consultation does not need to include a consultation relating to the type of environmental review required.
- The project adopts and implements a construction impact and mitigation plan, specifying mechanisms to reduce construction-related impacts to below state and local requirements for and communicate proactively and responsively with the community.
- The project adopts a plan to fully address any displacement from the project consistent with federal and state relocation laws, including a plan to replace any lost housing units through new market-rate and affordable housing.
- The plan includes specific commitments to expanding tenant education resources and offering tenants subject to relocation by the project access to legal counsel.
- The local land use authority adopts an affordable housing implementation plan that prioritizes the production of new affordable housing units, preservation of affordable homes, and protection of vulnerable residents from displacement to further plan for and address displacement. The plan may be citywide or for a specific area covering the project.
- The notice of exemption is filed, as specified, before January 1, 2032.
COMMENTS
This bill is intended to exempt the project to modernize and expand Diridon Station in San Jose from CEQA. The lead agency for the project, Caltrain, has hired a consultant to begin required environmental review, including CEQA and National Environmental Policy Act (NEPA), with an estimated completion in 2029. The preferred project alternative is estimated to cost $3-6 billion and is likely to take many years to fully fund and construct, following completion of environmental review and approval by the relevant agencies.
Aspects of the station project and area have been reviewed under CEQA at the planning and project level in recent years. Specifically, the station was included in the Bay Area Rapid Transit (BART) to Silicon Valley Phase 2 environmental impact report (EIR) certified in 2018, the Diridon Station Area Plan programmatic EIR certified in 2021, the Downtown West Project EIR certified in 2021, and the high-speed rail project EIR certified in 2022. Regardless of the application of CEQA, the project will require a NEPA review because of the use of federal funds. It is estimated that the CEQA exemption would reduce the project review time by one year.
According to the Author
SB 1375 establishes a targeted, criteria-based CEQA exemption tailored to the distinct realities of complex, multi-modal urban transit hubs. By recognizing the extensive environmental review, robust land-use planning, and years of deep, iterative community engagement already completed for these hubs, the bill responsibly saves time and public funds by eliminating redundant administrative delays for projects already thoroughly shaped by the public. Importantly, this measure maintains strict, legally binding compliance with all other state and federal environmental laws and regional permitting structures. Enabling the timely delivery of these critical transit centers will unlock profound regional and statewide benefits—accelerating a mode shift from automobiles, reducing greenhouse gas emissions, spurring transit-oriented housing, and creating thousands of high-quality jobs—without compromising essential statutory safeguards.
Arguments in Support
According to bill sponsor City of San Jose, the exemptions provided in SB 1375 appropriately recognize the prior environmental reviews conducted for key project components while maintaining compliance with all other applicable environmental laws and permitting requirements. This approach avoids duplicative review, reduces project delivery risk, and ensures that this critical infrastructure investment can move forward in a timely and cost-effective manner.
Arguments in Opposition
None received.
FISCAL COMMENTS
According to the Assembly Appropriations Committee, negligible state costs.
VOTES
SENATE FLOOR: 39-0-1
YES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Ochoa Bogh, Padilla, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
ABS, ABST OR NV: Niello
ASM NATURAL RESOURCES: 13-0-1
YES: Bryan, Ellis, Alanis, Connolly, Garcia, Haney, Hoover, Kalra, Macedo, Pellerin, Schultz, Wicks, Zbur
ABS, ABST OR NV: Muratsuchi
ASM APPROPRIATIONS: 15-0-0
YES: Wicks, Hoover, Arambula, Calderon, Caloza, Dixon, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache, Ta, Tangipa
UPDATED
VERSION: July 2, 2026
CONSULTANT: Lawrence Lingbloom / NAT. RES. / (916) 319-2092 FN: 0003394
Date of Hearing: August 5, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 1375
Author:(Cortese) – As Amended Ver:July 2, 2026
Policy Committee: | Natural Resources | Vote: | 13 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill exempts from the California Environmental Quality Act (CEQA) a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets 12 specified conditions.
In addition, the bill requires a lead agency, if it determines that a project is not subject to CEQA pursuant to this bill and determines to carry out that project, to file a notice of exemption (NOE) with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located, as specified. The bill permits the CEQA exemption only for projects for which an NOE is filed pursuant to this bill before January 1, 2032.
FISCAL EFFECT:
Negligible state costs.
COMMENTS:
1) Purpose. According to the author:
SB 1375 establishes a targeted, criteria-based CEQA exemption tailored to the distinct realities of complex, multi-modal urban transit hubs. By recognizing the extensive environmental review, robust land-use planning, and years of deep, iterative community engagement already completed for these hubs, the bill responsibly saves time and public funds by eliminating redundant administrative delays for projects already thoroughly shaped by the public. Importantly, this measure maintains strict, legally binding compliance with all other state and federal environmental laws and regional permitting structures.
2) Background. CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, the lead agency prepares an initial study to determine whether the project may have a significant effect on the environment. If the initial study shows the project would not have a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that project may have a significant effect, the lead agency must prepare an Environmental Impact Report.
This bill is sponsored by the City of San Jose, which notes the CEQA exemption will help advance the modernization and expansion of Diridon Station. According to the city, the proposed station – a major transit hub integrating multiple modes and encompassing several distinct projects managed by various agencies – will seamlessly connect regional, statewide, and local transit systems, including the Altamont Corridor Express, Amtrak, Caltrain, Valley Transportation Authority, and local and intercity bus services, while delivering significant public benefits, including improvements in transit connectivity, expanded access to sustainable transportation options, support for transit-oriented housing and mixed-use development, and the creation of thousands of jobs. The City of San Jose writes:
The exemptions provided in SB 1375 appropriately recognize the prior environmental reviews conducted for key project components while maintaining compliance with all other applicable environmental laws and permitting requirements. This approach avoids duplicative review, reduces project delivery risk, and ensures that this critical infrastructure investment can move forward in a timely and cost-effective manner.
There are numerous CEQA exemptions that could apply for rail projects; in fact, the Legislature passed two new statutory CEQA exemptions for rail stations in 2025. However, for reasons discussed in the Senate Transportation Committee’s analysis of this bill, Diridon Station is not quite eligible for either exemption.
According to the Assembly Natural Resources (ANR) Committee, the lead agency for the Diridon Station project, Caltrain, has hired a consultant to begin required environmental review, including that required by CEQA and the National Environmental Policy Act (NEPA). Caltrain estimates the preferred project alternative to cost between $3 billion and $6 billion and is likely to take many years to fully fund and construct, following completion of environmental review and approval by the relevant agencies.
Aspects of the station project and area have been reviewed under CEQA at the planning and project level in recent years. Regardless of the application of CEQA, the project will require a NEPA review because of the use of federal funds. According to the ANR Committee, the CEQA exemption is expected to reduce the project review time by one year.
Analysis Prepared by: Nikita Koraddi / APPR. / (916) 319-2081
Date of Hearing: June 22, 2026
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Isaac G. Bryan, Chair
SBPCA Bill Id:SB 1375
Author:(Cortese) – As Amended Ver:April 16, 2026
SENATE VOTE: 39-0
SUBJECT: California Environmental Quality Act: exemption: urban intermodal rail station project
SUMMARY: Exempts from the California Environmental Quality Act (CEQA) a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets specified conditions.
EXISTING LAW:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA. (Public Resources Code (PRC) 21000 et seq.)
- Exempts a project for the institution or increase of passenger or commuter service on rail or highway rights-of-way already in use, including modernization of existing stations and parking facilities. (PRC 21080(b)(10))
- Exempts high-speed rail maintenance facilities and stations that have been evaluated in a prior project-level EIR. (PRC 21080.70)
- Exempts, until January 1, 2040, several public transit project types, including:
- A project for the institution or increase of new bus rapid transit, bus, or light rail service, including the rehabilitation of stations, terminals, or existing operations facilities.
- A project for the institution or increase of zero-emission passenger rail service within an existing rail or highway right-of-way.
- Diesel-powered heavy rail projects meeting the “Tier 4” exhaust emissions standard, if the project is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone.
- A project to construct or maintain infrastructure to charge or refuel zero-emission transit buses, trains, and ferries.
(PRC 21080.25)
- PRC 21080.25 requires exempt projects meet the following criteria:
- A public agency is carrying out the project and is the lead agency for the project.
- The project is located on or within an existing public right-of-way.
- The project does not add physical infrastructure that increases new automobile capacity on existing rights-of-way except for minor modifications needed for the efficient and safe movement of transit vehicles, such as extended merging lanes.
- The construction of the project does not require the demolition of affordable housing units, including rent-controlled units and units occupied by low-income tenants.
- PRC 21080.25 requires a project exceeding $100 million to also meet all of the following criteria:
- The project is incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review within 10 years of the approval of the project.
- Construction impacts are fully mitigated.
- The lead agency completes and considers the results of a project business case, a racial equity analysis, and an analysis of residential displacement.
- The lead agency holds specified public meetings.
- PRC 21080.25 requires the lead agency to certify that the project will be completed by a skilled and trained workforce, as specified.
THIS BILL exempts a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets the following conditions:
- The project primarily modernizes and expands existing station facilities and rail infrastructure to improve operational efficiency, passenger capacity, and intermodal connectivity, including changes to tracks, platforms, station facilities, public plazas or realms, safety barriers, noise barriers, sound barriers, roadway crossing and access improvements, intermodal connections and facilities, transit-oriented development, and the interface with adjacent development.
- The station passenger rail service will exclusively use Tier IV or cleaner rolling stock or locomotive engines.
- The station is in an urban area and is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter or ozone at the time the exemption is applied for.
- The majority of the station project’s footprint is in an existing public or publicly owned right-of-way.
- The project complies with all applicable historic preservation measures, including Section 106 of the National Historic Preservation Act.
- The project adopts a natural resource management plan or equivalent document that identifies what natural resources are present on the site and how environmental impacts affecting those natural resources will be avoided, reduced, and compensated for.
- The project is in compliance with the California Endangered Species Act, Chapter 6 of Division 2 of the Fish and Game Code, the Porter-Cologne Water Quality Control Act, and all applicable natural resource protection laws.
- The project adopts a construction impact and mitigation plan, specifying mechanisms to reduce to below state and local requirements for construction-related impacts and communicate proactively and responsively with the community.
- The project adopts a plan for how any displacement from the project will be fully addressed in line with federal and state relocation laws, including a plan to replace any lost housing units through new market-rate and affordable housing.
- The plan includes specific commitments to expanding tenant education resources and offering tenants subject to relocation by the project access to legal counsel.
- The local land use authority adopts an affordable housing implementation plan that prioritizes the production of new affordable housing units, preservation of affordable homes, and protection of vulnerable residents from displacement to further plan for and address displacement. The plan may be citywide or for a specific area covering the project.
FISCAL EFFECT: According to the Senate Appropriations Committee, pursuant to Senate Rule 28.8, negligible state costs.
COMMENTS:
- Background. This bill is intended to exempt the project to modernize and expand Diridon Station in San Jose from CEQA. The lead agency for the project, Caltrain, has hired a consultant to begin required environmental review, including CEQA and National Environmental Policy Act (NEPA), with an estimated completion in 2029. The preferred project alternative is estimated to cost $3-6 billion and is likely to take many years to fully fund and construct, following completion of environmental review and approval by the relevant agencies.
Aspects of the station project and area have been reviewed under CEQA at the planning and project level in recent years. Specifically, the station was included in the Bay Area Rapid Transit (BART) to Silicon Valley Phase 2 EIR certified in 2018, the Diridon Station Area Plan programmatic EIR certified in 2021, the Downtown West Project EIR certified in 2021, and the high-speed rail project EIR certified in 2022. Regardless of the application of CEQA, the project will require a NEPA review because of the use of federal funds. It is estimated that the CEQA exemption would reduce the project review time by one year.
According to the City of San Jose:
Diridon Station, a key transit hub at the western edge of Downtown San Jose, will be expanded and redesigned to address the region’s future transit needs. A collaboration among five public agencies – City of San Jose, Caltrain, Santa Clara Valley Transportation Authority (VTA), California High-Speed Rail Authority (CHSRA), and Metropolitan Transportation Commission (MTC) (collectively the “Partner Agencies”) – is underway to develop a comprehensive plan for the station. This initiative aims to improve the station’s integration with the surrounding area, positioning it as a catalyst for both economic and community development. The goal of the project is to increase transit capacity and service, facilitate seamless transfers, and create a safe, passenger-friendly station.
On May 21, 2025, the Diridon Steering Committee – a representative body of the Partner Agencies – selected a preferred station alternative. This marked the conclusion of a two-year phase of work called the Business Case. The at-grade, preferred station alternative, will rebuild the station with the tracks at roughly the same elevation as they are today, and requires some streets surrounding the station to be regraded reconfigured to improve neighborhood connections, particularly for those on foot or bike.
Having selected a preferred alternative, the Partner Agencies began the next phase of work on the project: environmental review, which is expected to take approximately three to four years. The Partner Agencies selected an environmental consultant, ICF, to assist with this work. In parallel with this environmental review work, the Partner Agencies will continue to develop the funding strategy and implementation phasing for the project. They will also continue to develop the most suitable long-term organizational structure to deliver the project.
- Author’s statement:
SB 1375 establishes a targeted, criteria-based CEQA exemption tailored to the distinct realities of complex, multi-modal urban transit hubs. By recognizing the extensive environmental review, robust land-use planning, and years of deep, iterative community engagement already completed for these hubs, the bill responsibly saves time and public funds by eliminating redundant administrative delays for projects already thoroughly shaped by the public. Importantly, this measure maintains strict, legally binding compliance with all other state and federal environmental laws and regional permitting structures. Enabling the timely delivery of these critical transit centers will unlock profound regional and statewide benefits—accelerating a mode shift from automobiles, reducing greenhouse gas emissions, spurring transit-oriented housing, and creating thousands of high-quality jobs—without compromising essential statutory safeguards.
- Suggested amendments. Because this bill is intended to provide an exemption for one project in the near future, the author and the committee may wish to consider adding a filing deadline of January 1, 2032, after which additional projects could not use this exemption.
In addition, the author and the committee may wish to consider adding a provision offered by the author to memorialize the project proponents’ intention to follow the existing process for tribal consultation, notwithstanding the project’s exemption from other provisions of CEQA.
REGISTERED SUPPORT / OPPOSITION:
Support
Bay Area Council
City of San Jose
Diridon Station Steering Committee
Greenbelt Alliance
Metropolitan Transportation Commission
Peninsula Corridor Joint Powers Board (Caltrain)
San Francisco Bay Area Planning & Urban Research Association
San Jose Chamber of Commerce
San Jose Downtown Association
Santa Clara Valley Transportation Authority
Silicon Valley Bicycle Coalition
Opposition
None on file
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 1375 |
THIRD READING
Bill No: SB 1375
Author: Cortese (D)
Amended: 4/16/26
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 7-0, 4/15/26
AYES: Blakespear, Valladares, Allen, Dahle, Gonzalez, Hurtado, Menjivar
SENATE TRANSPORTATION COMMITTEE: 12-0, 4/21/26
AYES: Cortese, Strickland, Archuleta, Arreguín, Blakespear, Dahle, Gonzalez, Grayson, Richardson, Seyarto, Valladares, Wiener
NO VOTE RECORDED: Menjivar
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SUBJECT: California Environmental Quality Act: exemptions: City of San Jose: Diridon Station
SOURCE: Author
DIGEST:
This bill creates a California Environmental Quality Act (CEQA) exemption for certain rail transit stations, as specified.
ANALYSIS:
Existing law:
- Requires under CEQA that a lead agency determines whether a project is exempt from CEQA, or if it must do an initial study to determine if a project will have significant effects on the environment. If a project has no effect on the environment or effects that can be mitigated, the lead agency prepares a negative declaration (ND) or mitigated ND (MND). If the project will have significant impacts, the lead agency prepares an environmental impact report (EIR) to evaluate and propose mitigation measures for any effects on the environment, including impacts or likely impacts to land, air, water, minerals, flora, fauna, ambient noise, and historic or aesthetic significance. (Public Resources Code (PRC) §§21000 et seq.)
- Establishes over 135 CEQA exemptions in the public resources code, water code, government code and other statutes, and includes 33 categorical CEQA exemptions in the California Code of Regulations. (CEQA guidelines §15260- 15285)
- Establishes specific exemptions relating to railroads, including:
- Development, construction, or operation of a heavy maintenance facility or other maintenance facility for electrically powered high-speed rail, or passenger rail stations for the purpose of serving the high-speed rail meeting certain conditions. (PRC § 21080.70)
- Any railroad grade separation project that eliminates an existing grade crossing or reconstructs an existing grade separation. (PRC § 21080.13)
- A transit comprehensive operational analysis, transit route readjustment, or other transit agency route addition, elimination, or modification. (PRC § 21080.20(a)(B))
- The institution or increase of passenger or commuter services on rail or highway rights-of-way already in use, including modernization of existing stations and parking facilities. (PRC §21080(b)(10)).
- Facility extensions not to exceed four miles in length required to transfer passengers from or to exclusive public mass transit guideway or busway public transit services. (PRC §21080(b)(12)).
- A public project for the construction, operation, or repair of zero emission and near-zero powertrain vehicles, rail or cable cars, or rolling stock, among others. (PRC § 21080.25 (b)(5))
- A public project for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains or certified Tier 4 or cleaner rolling stock or locomotives in an existing right of way (ROW). (PRC § 21080.25 (b)(6)
- Development, construction, or operation of a heavy maintenance facility or other maintenance facility for electrically powered high-speed rail, or passenger rail stations for the purpose of serving the high-speed rail meeting certain conditions. (PRC § 21080.70)
This bill:
- Establishes a CEQA exemption for a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meet the following conditions:
- The project shall primarily modernize and expand existing station facilities and rail infrastructure to improve operational efficiency; passenger capacity; and intermodal connectivity; including changes to tracks; platforms; station facilities; public plazas or realms; safety, noise, or sound barriers; roadway crossing and access improvements; intermodal connections and facilities; transit-oriented development, and the interface with adjacent development.
- The station passenger rail service will exclusively use Tier IV or cleaner rolling stock or locomotives engines.
- The station is in an urban area and is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter or ozone at the time the exemption is applied for.
- The majority of the station project’s footprint must be in an existing public or publicly-owned right of way.
- The project complies with all applicable historic preservation measures, as specified.
- The project adopts a natural resource management plan or equivalent document that identifies what natural resources are present on the site and how environmental impacts affecting those natural resources will be avoided, reduced, and/or compensated for.
- The project is in compliance with the California Endangered Species Act, the Porter Cologne Water Quality Control Act, and all applicable natural resource protection laws.
- The project adopts a Construction Impact and Mitigation Plan, specifying mechanisms to reduce to below state and local requirements construction-related impacts and communicate proactively and responsively with the community.
- The project adopts a plan on how any displacement from the project will be fully addressed in line with federal and state relocation laws, including a plan to replace any lost housing units through new market-rate and affordable housing.
- The displacement plan includes specific commitments to expanding tenant education resources and offering tenants subject to relocation by the project access to legal counsel.
- The local land use authority adopts an Affordable Housing Implementation Plan to further plan for and address displacement that prioritizes the production of new affordable housing units; preservation of affordable homes; and protection of vulnerable residents from displacement. The plan may be citywide or for a specific area covering the project.
- Includes findings and declarations regarding the need for modernization of intermodal rail stations.
- Declares that no reimbursement is required by this bill because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this bill.
Background
- Transportation and climate change. California’s transportation network consists of streets, highways, railways, bicycle routes, and pedestrian pathways. This network provides people and businesses the ability to access destinations and move goods and services throughout the state. Construction, operations, and maintenance responsibilities are shared amongst state, regional, tribal and local governments. Funding for these activities comes from federal, state, and local taxes, fees and assessments, private investments and tribal investments. This collaborative effort results in a well-integrated transportation network that provides mobility for 40 million people, while helping California sustain its position as the world’s fourth largest economy. Currently, roughly $35 billion (federal, state, and local funds combined) is spent annually in California on building and maintaining the transportation network. Additionally, the federal Infrastructure Investment and Jobs Act (IIJA, P.L. 117- 58), was expected to provide California with approximately $40 billion over five years.
Emissions from the transportation sector, the state’s largest source of greenhouse gas (GHG) emissions, are still on the rise despite statewide GHG emission reduction efforts and increasingly ambitious targets. According to California Air Resources Board (CARB)’s GHG emission inventory, the transportation sector emissions have grown to 41% of California’s total emissions as of 2017. A 2018 Legislative Analyst’s Office report found that roughly 90% of the transportation sector’s emissions were from on-road sources – 69% passenger vehicles and 22% heavy-duty vehicles. Within the transportation sector, measures to reduce GHG emissions include requiring the use of low carbon fuels, cleaner vehicles, and strategies to promote sustainable communities, and improved transportation choices that reduce growth in the number of vehicle miles traveled (VMT).
CARB’s 2022 Scoping Plan scenario for achieving 85% GHG emission reductions by 2045 calls for a 25% reduction in VMT by 2030 and a 30% reduction in VMT by 2045. Mode shift – getting people out of their cars and onto public transit and active transportation – is an important component of success. For example, achieving these VMT targets through shifting to transit means California would need a 5 to 10 times ridership increase from pre-COVID levels by 2045.
- The A, B, C’s of CEQA. CEQA is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment. CEQA is enforced by civil lawsuits that can challenge any project’s environmental review.
Under CEQA, projects (unless they have a specific exemption) must undergo environmental analysis. This process starts with an initial study which determines what level of further environmental review is needed for a given project. If a project has no significant effects on the environment, or if those effects can be fully mitigated, the project can move forward with an ND or MND. If the initial study finds the project has potential significant effects on the environment, then a full EIR is conducted.
- CEQA Exemptions: Categorical and Statutory. Some types of projects may be eligible for CEQA exemptions. If a project is exempt from CEQA, the lead agency simply identifies which exemption the project is eligible for, and no further environmental review or public engagement is required.
There are two types of CEQA exemptions— statutory and categorical. Statutory exemptions are created by the Legislature and apply even if a project has the potential to significantly affect the environment. In contrast, categorical exemptions, which are developed by the Office of Land Use and Climate Innovation (LCI) and approved by the Secretary of the Natural Resources Agency as part of the CEQA guidelines, generally do not apply if there are significant environmental impacts associated with the project. More specifically, categorical exemptions do not apply if (1) there is a reasonable possibility of a significant effect on the environment due to unusual circumstances; (2) significant cumulative impacts from projects of the same type will result; or (3) the project will have impacts on a uniquely sensitive environment.
There are over 120 statutory CEQA exemptions in the Public Resources Code, Water Code, Government Code, Health and Safety Code. There are also 33 categorical CEQA exemptions listed in the CEQA guidelines. However, these exemptions are almost exclusively for types of projects, not for specific projects.
- CEQA exemptions for rail projects. There are numerous CEQA exemptions that could apply for rail projects, including CEQA exemptions for: facility extensions up to four miles long to transfer passengers to transit services, and public projects for the construction, operation, or repair of zero emission and near-zero powertrain vehicles, rail or cable cars. This includes two CEQA exemptions for rail facilities that were passed through the Legislature last year in SB 71 (Weiner, Chapter 742, Statutes of 2025) and SB 131 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2025). The relevant portions of these two policies do, briefly, the following:
SB 131 creates an exemption for construction, operation, or maintenance of high-speed rail projects that meet certain criteria, specifically that:
- The station is located within the resource study area of a previously certified environmental impact report prepared for a high-speed rail or passenger rail project
- The project incorporates all applicable mitigation measures identified in the previously certified environmental impact report.
SB 71 (Wiener, Chapter 742, Statutes of 2025) Creates a CEQA exemption for public projects for rail facilities for zero-emission and for near zero emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. To be eligible for this rail facility project, the project must be located entirely within an existing public right-of-way and in an urban area.
This CEQA exemption also applies to certified Tier 4 or cleaner rolling stock or locomotives, except that the exemption does not need to be in an urban area: instead, the project cannot be located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone.
- Diridon Station. According to the City of San José’s website on the project, “Diridon Station, a key transit hub at the western edge of Downtown San José, will be expanded and redesigned to address the region's future transit needs. A collaboration among five public agencies – City of San José, Caltrain, Santa Clara Valley Transportation Authority (VTA), California High-Speed Rail Authority (CHSRA), and Metropolitan Transportation Commission (MTC) (collectively the “Partner Agencies”)– is underway to develop a comprehensive plan for the station. This initiative aims to improve the station's integration with the surrounding area, positioning it as a catalyst for both economic and community development. The goal of the project is to increase transit capacity and service, facilitate seamless transfers, and create a safe, passenger-friendly station.”[1]
The project was begun in 2023 with a two-year “Business Case” phase to assess project alternatives. Following a decision made May of 2025, according to the City website, the Partner Agencies began environmental review on the project, which is expected to take approximately three to four years.
Comments
- Purpose of Bill. According to the author, “SB 1375 is a targeted, project specific measure that recognizes the extensive environmental review already completed for major transit projects and adopted land use plans in the Diridon Station area.
“This exemption applies only to the Diridon Station Modernization Program in San Jose and maintains full compliance with all other environmental laws and permitting requirements. Advancing this project is critical for the region, as the modernized station will deliver significant environmental and mobility benefits by supporting mode shift from automobiles, reducing greenhouse gas emissions, and strengthening major rail and transit connections. It will also spur transit-oriented housing, mixed use development and create thousands of good jobs. SB 1375 responsibly saves time and public funds while enabling timely delivery of a key statewide mobility, climate, and economic asset.”
- Diridon Station is not quite eligible for an exemption. As discussed above, the Legislature passed two new statutory CEQA exemptions for rail stations in 2025. SB 71 is for passenger rail stations for zero emission, near zero, and lower emission locomotives (Tier IV), and SB 131 is for high-speed rail stations. However, Diridon is not quite eligible for either of these exemptions.
Diridon station is not eligible for the CEQA exemption created in SB 71 because it is not in the existing right-of-way of the station. Specifically, it deviates from the existing right-of-way only in some areas, with about 20% of the project falling outside of the existing right-of-way. Some of this 20% contains important existing structures. For example, a portion of the Diridon station project that is not within the existing right-of-way would cut through a market-rate housing development with more than 150 units. This issue would have been considered and open to public comment and mitigation measures if the project was fully in an existing right-of-way that had already undergone CEQA. Diridon station is not eligible for the CEQA exemption under SB 131 because it does not meet all the necessary siting criteria.
SB 1375 creates a new category of CEQA exemptions for large intermodal rail stations. The previous version of SB 1375 created a CEQA exemption specifically for Didrion Station. Recent amendments to the bill instead create a new category of rail exemption for large intermodal rail stations. Specifically, SB 1375 requires the intermodal rail station to be a public, urban intermodal rail station with a long- urbanized area within the statewide passenger rail network at which high-capacity light, commuter, and intercity rail services converge. This new category contains similar environmental guardrails established for rail projects in SB 71 and SB 131, such as requiring the passenger rail service at the station to be zero-emission, near-zero-emission, or a Tier IV diesel; the project is in an urban area; the project is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone; and the project is primarily in an existing right-of-way.
- What are we missing? SB 1375 provides a CEQA exemption for urban intermodal rail systems. It is unclear if any other rail station projects would qualify other than Diridon Station. If the project does not undergo a full CEQA process and analysis, there may be a gap in understanding and mitigation of environmental impacts. As detailed by the sponsors, the Diridon station project has already been the subject of extensive CEQA work. Specifically, the station was included in the BART to Silicon Valley Phase 2 EIR certified in 2018, the Diridon Station Area Plan programmatic EIR certified in 2021, the Downtown West Project EIR certified in 2021, and the high-speed rail project EIR certified in 2022. Additionally, as mentioned above, the project will require a NEPA review because of the use of federal funds. It is estimated that the CEQA exemption in SB 1375 would reduce the project review time by a year.
However, there are areas outside the existing right-of-way worthy of consideration. For example, the Diridon Station project is planned to cut through a newly built market-rate housing complex with 162 units and will be built next to existing housing, meaning that construction impacts could affect those nearby residents. Under CEQA, those affected residents would have an opportunity to engage in a public process, including making comments on the environmental review documents that the lead agency would have to respond to.
To help ensure that the effects of the project on residents of the housing complex in the path of the project and other nearby residents are mitigated and justly compensated for, SB 1375 includes the project applicant to submit a plan that will identify how to fully mitigate impacts related to construction, and a plan for how any displacement from the project will be fully mitigated in line with federal and state relocation laws. This would include replacing any lost units through new market-rate and affordable housing, and specific commitments to provide assistance to residents facing displacement.
Additionally, the Diridon station project, while in an infill area, is also in an existing conservation easement and near a creek. The impacts of the project on the natural resources at the site would ordinarily be reviewed through CEQA, which could include mitigation measures. To ensure that all natural resources that might be impacted by the project, and that would have been considered under CEQA review, are protected, SB 1375 requires the project applicant to adopt a natural resource management plan or equivalent document to be eligible for the exemption. Natural resource management plans include identification of natural resources in an area, and plans to protect those resources, including avoiding impacts or mitigating impacts when necessary.
Finally, the Diridon station project will replace a historic stadium with a new one. Any impacts to historic structures under CEQA would be required to be evaluated and mitigated where possible. To protect the historic structure, the bill requires the project applicant to be in compliance with Section 106 of the National Historic Preservation Act of 1966.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 5/11/26)
Bay Area Council
Calfornia-nevada Conference of Operating Engineers
City of San Jose
Diridon Station Steering Committee
Greenbelt Alliance
International Union of Operating Engineers, Cal-nevada Conference
Metropolitan Transportation Commission
San Jose Chamber of Commerce
San Jose Downtown Association
Santa Clara Valley Transportation Authority
Silicon Valley Bicycle Coalition
Spur
Streets for All
OPPOSITION: (Verified 5/11/26)
None received
Prepared by: Brynn Cook / E.Q. / (916) 651-4108
5/13/26 16:28:06
**** END ****
The Future of Diridon Station, City of San José. https://www.diridonsj.org/ Accessed 4/5/2026 ↑
SENATE COMMITTEE ON TRANSPORTATION
Senator Dave Cortese, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 4/21/2026
Author: | Cortese | ||
Version: | 4/16/2026 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Melissa White | ||
SUBJECT:
DIGEST: This bill creates a California Environmental Quality Act (CEQA) exemption for certain rail transit stations, as specified.
ANALYSIS:
Existing law:
- Requires under CEQA that a lead agency determines whether a project is exempt from CEQA, or if it must do an initial study to determine if a project will have significant effects on the environment. If a project has no effect on the environment or effects that can be mitigated, the lead agency prepares a negative declaration (ND) or mitigated ND (MND). If the project will have significant impacts, the lead agency prepares an environmental impact report (EIR) to evaluate and propose mitigation measures for any effects on the environment, including impacts or likely impacts to land, air, water, minerals, flora, fauna, ambient noise, and historic or aesthetic significance.
- Establishes over 135 CEQA exemptions in the public resources code, water code, government code and other statutes, and includes 33 categorical CEQA exemptions in the California Code of Regulations.
- Establishes specific exemptions relating to railroads, including:
- Development, construction, or operation of a heavy maintenance facility or other maintenance facility for electrically powered high-speed rail, or passenger rail stations for the purpose of serving the high-speed rail meeting certain conditions.
- Any railroad grade separation project that eliminates an existing grade crossing or reconstructs an existing grade separation.
- A transit comprehensive operational analysis, transit route readjustment, or other transit agency route addition, elimination, or modification.
- The institution or increase of passenger or commuter services on rail or highway rights-of-way already in use, including modernization of existing stations and parking facilities.
- Facility extensions not to exceed four miles in length required to transfer passengers from or to exclusive public mass transit guideway or busway public transit services.
- A public project for the construction, operation, or repair of zero emission and near-zero powertrain vehicles, rail or cable cars, or rolling stock, among others.
- A public project for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains or certified Tier 4 or cleaner rolling stock or locomotives in an existing right-of-way (ROW).
- Development, construction, or operation of a heavy maintenance facility or other maintenance facility for electrically powered high-speed rail, or passenger rail stations for the purpose of serving the high-speed rail meeting certain conditions.
- Defines ‘Natural and Protected Lands” to mean sites located within any of the following locations:
- The state park system;
- A wilderness area;
- A marine protected area;
- The national park system;
- A national recreation area;
- A national monument;
- The national wild and scenic rivers system;
- Any ecological reserve or wildlife management area acquired and managed by the Department of Fish and Wildlife;
- A hazardous waste site, as specified;
- Within a regulatory floodway;
- Lands under conservation easement;
- Within 300 feet of a wetland;
- An environmentally sensitive area within the coastal zone;
- Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act or other adopted natural resource protection plan;
- Within a very high fire hazard severity zone, unless the sites have adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the development; or,
- Either prime farmland or farmland of statewide importance.
This bill:
- Establishes a CEQA exemption for a public urban, intermodal rail station project within a long-urbanized area within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meet the following conditions:
- The project shall primarily modernize and expand existing station facilities and rail infrastructure to improve operational efficiency; passenger capacity; and intermodal connectivity; including changes to tracks; platforms; station facilities; public plazas or realms; safety, noise, or sound barriers; roadway crossing and access improvements; intermodal connections and facilities; transit-oriented development, and the interface with adjacent development.
- The station passenger rail service will exclusively use Tier IV or cleaner rolling stock or locomotives engines.
- The station is in an urban area and is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter or ozone at the time the exemption is applied for.
- The majority of the station project’s footprint must be in an existing public or publicly-owned right of way.
- The project complies with all applicable historic preservation measures, as specified.
- The project adopts a natural resource management plan or equivalent document that identifies what natural resources are present on the site and how environmental impacts affecting those natural resources will be avoided, reduced, and/or compensated for.
- The project is in compliance with the California Endangered Species Act, the Porter Cologne Water Quality Control Act, and all applicable natural resource protection laws.
- The project adopts a Construction Impact and Mitigation Plan, specifying mechanisms to reduce to below state and local requirements construction-related impacts and communicate proactively and responsively with the community.
- The project adopts a plan on how any displacement from the project will be fully addressed in line with federal and state relocation laws, including a plan to replace any lost housing units through new market-rate and affordable housing.
- The displacement plan includes specific commitments to expanding tenant education resources and offering tenants subject to relocation by the project access to legal counsel.
- The local land use authority adopts an Affordable Housing Implementation Plan to further plan for and address displacement that prioritizes the production of new affordable housing units; preservation of affordable homes; and protection of vulnerable residents from displacement. The plan may be citywide or for a specific area covering the project.
- Includes findings and declarations regarding the need for modernization of intermodal rail stations.
- Declares that no reimbursement is required by the bill because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by the bill.
COMMENTS:
- Purpose of the bill. According to the author, “SB 1375 provides a targeted CEQA exemption for the Diridon Station Program in San José. The measure reflects the extensive environmental review already completed in the Diridon Station area. This exemption applies only to the Diridon Station Modernization Program in San Jose and maintains full compliance with all other environmental laws, permitting requirements, and community commitments. Advancing this project is critical for the region, as the modernized station will deliver significant environmental and mobility benefits by supporting mode shift from automobiles, reducing greenhouse gas emissions, and strengthening major rail and transit connections. It will also spur transit oriented housing, mixed use development and create thousands of good jobs. SB 1375 responsibly saves time and public funds while enabling timely delivery of a key statewide mobility, climate, and economic asset.”
- Transportation and climate change. California’s transportation network consists of streets, highways, railways, bicycle routes, and pedestrian pathways. This network provides people and businesses the ability to access destinations and move goods and services throughout the state. Construction, operations, and maintenance responsibilities are shared amongst state, regional, tribal and local governments. Funding for these activities comes from federal, state, and local taxes, fees and assessments, private investments and tribal investments. This collaborative effort results in a well-integrated transportation network that provides mobility for 40 million people, while helping California sustain its position as the world’s fourth largest economy. Currently, roughly $35 billion (federal, state, and local funds combined) is spent annually in California on building and maintaining the transportation network. Additionally, the federal Infrastructure Investment and Jobs Act (IIJA, P.L. 117- 58), was expected to provide California with approximately $40 billion over five years.
Emissions from the transportation sector, the state’s largest source of greenhouse gas (GHG) emissions, are still on the rise despite statewide GHG emission reduction efforts and increasingly ambitious targets. According to California Air Resources Board (CARB)’s GHG emission inventory, the transportation sector emissions have grown to 41% of California’s total emissions as of 2017. A 2018 Legislative Analyst’s Office report found that roughly 90% of the transportation sector’s emissions were from on-road sources – 69% passenger vehicles and 22% heavy-duty vehicles. Within the transportation sector, measures to reduce GHG emissions include requiring the use of low carbon fuels, cleaner vehicles, and strategies to promote sustainable communities, and improved transportation choices that reduce growth in the number of vehicle miles traveled (VMT).
CARB’s 2022 Scoping Plan scenario for achieving 85% GHG emission reductions by 2045 calls for a 25% reduction in VMT by 2030 and a 30% reduction in VMT by 2045. Mode shift – getting people out of their cars and onto public transit and active transportation – is an important component of success. For example, achieving these VMT targets through shifting to transit means California would need a 5 to 10 times ridership increase from pre-COVID levels by 2045.
- The A, B, C’s of CEQA. CEQA is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment. CEQA is enforced by civil lawsuits that can challenge any project’s environmental review.
Under CEQA, projects (unless they have a specific exemption) must undergo environmental analysis. This process starts with an initial study which determines what level of further environmental review is needed for a given project. If a project has no significant effects on the environment, or if those effects can be fully mitigated, the project can move forward with an ND or MND. If the initial study finds the project has potential significant effects on the environment, then a full EIR is conducted.
- CEQA Exemptions: Categorical and Statutory. Some types of projects may be eligible for CEQA exemptions. If a project is exempt from CEQA, the lead agency simply identifies which exemption the project is eligible for, and no further environmental review or public engagement is required.
There are two types of CEQA exemptions— statutory and categorical. Statutory exemptions are created by the Legislature and apply even if a project has the potential to significantly affect the environment. In contrast, categorical exemptions, which are developed by the Office of Land Use and Climate Innovation (LCI) and approved by the Secretary of the Natural Resources Agency as part of the CEQA guidelines, generally do not apply if there are significant environmental impacts associated with the project. More specifically, categorical exemptions do not apply if there is a reasonable possibility of a significant effect on the environment due to unusual circumstances; significant cumulative impacts from projects of the same type will result; or the project will have impacts on a uniquely sensitive environment.
There are over 120 statutory CEQA exemptions in the Public Resources Code, Water Code, Government Code, and Health and Safety Code. There are also 33 categorical CEQA exemptions listed in the CEQA guidelines. However, these exemptions are almost exclusively for types of projects, not for specific projects.
- CEQA exemptions for rail projects. There are numerous CEQA exemptions that could apply for rail projects, including CEQA exemptions for: facility extensions up to four miles long to transfer passengers to transit services, and public projects for the construction, operation, or repair of zero emission and near-zero powertrain vehicles, rail or cable cars. This includes two CEQA exemptions for rail facilities that were passed by the Legislature last year, SB 71 (Wiener, Chapter 742, Statutes of 2025) and SB 131 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2025). Specifically, SB 131 creates an exemption for construction, operation, or maintenance of high-speed rail projects that meet certain criteria: (1) the station is located within the resource study area of a previously certified environmental impact report prepared for a high-speed rail or passenger rail project; and (2) the project incorporates all applicable mitigation measures identified in the previously certified environmental impact report.
SB 71 creates a CEQA exemption for public projects for rail facilities for zero‑emission and for near zero emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. To be eligible for this rail facility project, the project must be located entirely within an existing public right-of-way and in an urban area. This CEQA exemption also applies to certified Tier 4 or cleaner rolling stock or locomotives, except that the exemption does not need to be in an urban area: instead, the project cannot be located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone.
- Diridon Station. Diridon station is a major transit hub located at the western edge of downtown San Jose. Originally built in 1935, the station is a site of historic and cultural importance, in addition to being the central passenger rail hub for San Jose, Santa Clara County, and Silicon Valley. Diridon serves as an anchor station for the three commuter and intercity rail operators in the region, the Altamont Corridor Express (ACE), Caltrain, and the Capitol Corridor. Furthermore, the station is a midway stop for Amtrak’s Coast Starlight service and is a stop along the Santa Clara Valley Transportation Authority (VTA)’s green line light rail service. In addition to train service, Diridon is also an important bus station. VTA buses, Amtrak thruway buses, Greyhound, and the Santa Cruz METRO all service the station.
Beyond its current importance, the station’s status as a major transit hub is only set to increase in the coming years. By 2040 it is projected that the station will serve over 9,000 daily passengers, with additional service to the station from Bay Area Rapid Transit (BART) and California High-Speed Rail. Furthermore, Google has proposed a massive investment in the area immediately around the station, proposing to build over 7 million square feet of office space and 4,000 new housing units. Although the timelines for this specific project remain uncertain, the station is already an attractive location for transit-oriented development, something that will only increase as more operators start serving the station.
To prepare for this growth, there has been growing interest in redesigning the station so that it can better serve these transit and passenger volumes. This project is being undertaken by a collaboration of five public entities: City of San Jose, Caltrain, VTA, CA High-Speed Rail Authority, and the Metropolitan Transportation Commission (MTC). Together, they aim to upgrade the station to improve integration with the surrounding area, increase transit capacity, facilitate more seamless transfers, and create a more passenger friendly station.
Last year, this group officially approved the planned station alternative design they will pursue. The principal feature of this design is that it keeps all existing tracks at their current grade and adds a new pedestrian plaza at the entrance to the station. This plan was adopted over the alternative of elevating the existing track due to substantial cost savings and to minimize disruption to Caltrain service. Additionally, this plan was created with substantial community input totaling 5,700 inputs across 40 public events.
With the station plan decided on, the project now moves onto the environmental review stage. Under current law, the proposed project must be reviewed under both CEQA and the National Environmental Policy Act (NEPA). It is estimated that the entire review process will take three to four years.
- Diridon Station is not quite eligible for an exemption. As discussed above, the Legislature passed two new statutory CEQA exemptions for rail stations in 2025. SB 71 is for passenger rail stations for zero emission, near zero, and lower emission locomotives (Tier IV), and SB 131 is for high-speed rail stations. However, Diridon is not quite eligible for either of these exemptions.
Diridon station is not eligible for the CEQA exemption created in SB 71 because it is not in the existing right-of-way of the station. Specifically, it deviates from the existing right-of-way only in some areas, with about 20% of the project falling outside of the existing right-of-way. Some of this 20% contains important existing structures. For example, a portion of the Diridon station project that is not within the existing right-of-way would cut through a market-rate housing development with more than 150 units. This issue would have been considered and open to public comment and mitigation measures if the project was fully in an existing right-of-way that had already undergone CEQA. Diridon station is not eligible for the CEQA exemption under SB 131 because it does not meet all the necessary siting criteria.
- SB 1375 creates a new category of CEQA exemptions for large intermodal rail stations. The previous version of SB 1375 created a CEQA exemption specifically for Didrion Station. Recent amendments to the bill instead create a new category of rail exemption for large intermodal rail stations. Specifically, SB 1375 requires the intermodal rail station to be a public, urban intermodal rail station with a long- urbanized area within the statewide passenger rail network at which high-capacity light, commuter, and intercity rail services converge. This new category contains similar environmental guardrails established for rail projects in SB 71 and SB 131, such as requiring the passenger rail service at the station to be zero-emission, near-zero-emission, or a Tier IV diesel; the project is in an urban area; the project is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone; and the project is primarily in an existing right-of-way.
- What are we missing? SB 1375 provides a CEQA exemption for urban intermodal rail systems. It is unclear if any other rail station projects would qualify other than Diridon Station. If the project does not undergo a full CEQA process and analysis, there may be a gap in understanding and mitigation of environmental impacts. As detailed by the sponsors, the Diridon station project has already been the subject of extensive CEQA work. Specifically, the station was included in the BART to Silicon Valley Phase 2 EIR certified in 2018, the Diridon Station Area Plan programmatic EIR certified in 2021, the Downtown West Project EIR certified in 2021, and the high-speed rail project EIR certified in 2022. Additionally, as mentioned above, the project will require a NEPA review because of the use of federal funds. It is estimated that the CEQA exemption in SB 1375 would reduce the project review time by a year.
However, there are areas outside the existing right-of-way worthy of consideration. For example, the Diridon Station project is planned to cut through a newly built market-rate housing complex with 162 units and will be built next to existing housing, meaning that construction impacts could affect those nearby residents. Under CEQA, those affected residents would have an opportunity to engage in a public process, including making comments on the environmental review documents that the lead agency would have to respond to.
To help ensure that the effects of the project on residents of the housing complex in the path of the project and other nearby residents are mitigated and justly compensated for, SB 1375 includes the project applicant to submit a plan that will identify how to fully mitigate impacts related to construction, and a plan for how any displacement from the project will be fully mitigated in line with federal and state relocation laws. This would include replacing any lost units through new market-rate and affordable housing, and specific commitments to provide assistance to residents facing displacement.
Additionally, the Diridon station project, while in an infill area, is also in an existing conservation easement and near a creek. The impacts of the project on the natural resources at the site would ordinarily be reviewed through CEQA, which could include mitigation measures. To ensure that all natural resources that might be impacted by the project, and that would have been considered under CEQA review, are protected, SB 1375 requires the project applicant to adopt a natural resource management plan or equivalent document to be eligible for the exemption. Natural resource management plans include identification of natural resources in an area, and plans to protect those resources, including avoiding impacts or mitigating impacts when necessary.
Finally, the Diridon station project will replace a historic stadium with a new one. Any impacts to historic structures under CEQA would be required to be evaluated and mitigated where possible. To protect the historic structure, the bill requires the project applicant to be in compliance with Section 106 of the National Historic Preservation Act of 1966.
Writing in support, the Bay Area Council states, “Diridon Station is one of the most important existing and future transit hubs in California, serving as the convergence point for regional, statewide, and local transit systems, including BART, Caltrain, Altamont Corridor Express (ACE), Capitol Corridor, California High-Speed Rail, light rail, and bus services. Modernizing this station will significantly enhance connectivity, improve reliability, and expand access to sustainable transportation options.
“SB 1375 reflects the extensive environmental review that has already been completed for major transit projects and land use plans in the Diridon Station area. However, the integrated nature of the station modernization program requires coordination across multiple systems that is not fully addressed under current CEQA exemptions. Without this legislation, the project may face unnecessary delays and increased costs.
“By providing a narrow and targeted exemption, SB 1375 allows this critical project to move forward efficiently while maintaining compliance with other applicable environmental laws and safeguards. Advancing the Diridon Station Program will help reduce greenhouse gas emissions, support transit-oriented development, create jobs, and strengthen California’s overall transportation network.”
- Double referral. This bill was double referred to the Senate Environmental Quality Committee where it passed out on a 7-0 vote on April 15, 2026.
Related/PREVIOUS Legislation:
SB 71 (Wiener, Chapter 742, Statutes of 2025) – Expanded and extended existing CEQA exemptions for transit projects, and exempts Diesel-powered
heavy rail projects meeting the "Tier IV" exhaust emissions standard if certain
criteria are met, among other changes.
SB 131 (Budget and Fiscal Review, Chapter 24, Statutes of 2025) – Created, among numerous other changes to CEQA, a CEQA exemption for high-speed rail facilities meeting certain criteria including that the project is not located on natural and protected lands.
AB 35 (Alvarez, 2025) – Would have limited, until January 1, 2036, CEQA review for “clean hydrogen transportation projects”, required the lead agency to determine whether to approve a “clean hydrogen environmental assessment” used in lieu of CEQA documentation and issue a discretionary permit or authorization for the project no later than 270 days after the application for the project is deemed complete. The bill would have further required any lawsuits against a “clean hydrogen transportation project”, including all appeals and as feasible be resolve within 270 days. AB 35 was gut and amended into an unrelated bill.
AB 2503 (Lee, Chapter 718, Statutes of 2024) – Expands existing CEQA exemptions for transit projects to include public project for the institution or increase of zero-emission passenger rail service within an existing rail or highway right-of-way.
SB 922 (Wiener, Chapter 987, Statutes of 2022) – Expands CEQA exemptions for specified transit, bicycle, and pedestrian and other transportation projects, and extends these exemptions from 2023 to 2030.
SB 288 (Wiener, Chapter 200, Statutes of 2020) – Exempts from CEQA specified transit, bicycle, and pedestrian and other transportation projects, through January 1, 2023.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
POSITIONS: (Communicated to the committee before noon on Wednesday,
April 15, 2026.)
SUPPORT:
City of San Jose (sponsor)
Bay Area Council
California-Nevada Conference of Operating Engineers
Diridon Station Steering Committee
Greenbelt Alliance
International Union of Operating Engineers, Cal-Nevada Conference
Metropolitan Transportation Commission
San Jose Chamber of Commerce
Santa Clara Valley Transportation Authority
Silicon Valley Bicycle Coalition
Streets for All
OPPOSITION:
None received
-- END --
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Blakespear, Chair
2025 - 2026 Regular
Bill No: SB 1375
Author: | Cortese | ||
Version: | 3/25/2026 | Hearing Date: | 4/15/2022 |
Urgency: | No | Fiscal: | Yes |
Consultant: | Brynn Cook | ||
SUBJECT: California Environmental Quality Act:exemptions:City of San Jose:Diridon Station
DIGEST: This bill creates a California Environmental Quality Act (CEQA) exemption for the Diridon Station in San Jose.
ANALYSIS:
Existing law:
- Requires under CEQA that a lead agency determines whether a project is exempt from CEQA, or if it must do an initial study to determine if a project will have significant effects on the environment. If a project has no effect on the environment or effects that can be mitigated, the lead agency prepares a negative declaration (ND) or mitigated ND (MND). If the project will have significant impacts, the lead agency prepares an environmental impact report (EIR) to evaluate and propose mitigation measures for any effects on the environment, including impacts or likely impacts to land, air, water, minerals, flora, fauna, ambient noise, and historic or aesthetic significance. (Public Resources Code (PRC) §§21000 et seq.)
- Establishes over 135 CEQA exemptions in the public resources code, water code, government code and other statutes, and includes 33 categorical CEQA exemptions in the California Code of Regulations. (CEQA guidelines §15260- 15285)
- Establishes specific exemptions relating to railroads, including:
- Development, construction, or operation of a heavy maintenance facility or other maintenance facility for electrically powered high-speed rail, or passenger rail stations for the purpose of serving the high-speed rail meeting certain conditions. (PRC § 21080.70)
- Any railroad grade separation project that eliminates an existing grade crossing or reconstructs an existing grade separation. (§21080.13)
- A transit comprehensive operational analysis, transit route readjustment, or other transit agency route addition, elimination, or modification (PRC § 21080.20(a)(B))
- The institution or increase of passenger or commuter services on rail or highway rights-of-way already in use, including modernization of existing stations and parking facilities. (PRC §21080(b)(10)).
- Facility extensions not to exceed four miles in length required to transfer passengers from or to exclusive public mass transit guideway or busway public transit services. (PRC §21080(b)(12)).
- A public project for the construction, operation, or repair of zero emission and near-zero powertrain vehicles, rail or cable cars, or rolling stock, among others. (PRC § 21080.25 (b)(5))
- A public project for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains or certified Tier 4 or cleaner rolling stock or locomotives in an existing right of way (ROW). (PRC § 21080.25 (b)(6)
- Development, construction, or operation of a heavy maintenance facility or other maintenance facility for electrically powered high-speed rail, or passenger rail stations for the purpose of serving the high-speed rail meeting certain conditions. (PRC § 21080.70)
- Defines ‘Natural and Protected Lands” to mean sites located within any of the following locations:
- The state park system;
- A wilderness area;
- A marine protected area;
- The national park system;
- A national recreation area;
- A national monument;
- The national wild and scenic rivers system;
- Any ecological reserve or wildlife management area acquired and managed by the Department of Fish and Wildlife;
- A hazardous waste site, unless:
- The site is an underground storage tank site that received a uniform closure letter based on closure criteria established by the State Water Resources Control Board for the use proposed by the project.
- The State Department of Public Health, State Water Resources Control Board, Department of Toxic Substances Control, or a local agency making a determination pursuant to subdivision (c) of Section 25296.10 of the Health and Safety Code has otherwise determined that the site is suitable for the use proposed by the project;
- Within a regulatory floodway ;
- Lands under conservation easement;
- Within 300 feet of a wetland;
- An environmentally sensitive area within the coastal zone;
- Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act or other adopted natural resource protection plan;
- Within a very high fire hazard severity zone, unless the sites that have adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the development;
- Either prime farmland or farmland of statewide importance (PRC§ 21067.5)
This bill:
- Establishes a CEQA exemption for the Diridon Station, a public project in the City of San Jose. This includes CEQA exemptions for the track, platform, station, public plaza or realm, roadway crossing and access improvements, and intermodal facilities and connections.
- Makes related findings and declarations.
Background
- The A, B, C’s of CEQA. CEQA is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment. CEQA is enforced by civil lawsuits that can challenge any project’s environmental review.
Under CEQA, projects (unless they have a specific exemption) must undergo environmental analysis. This process starts with an initial study which determines what level of further environmental review is needed for a given project. If a project has no significant effects on the environment, or if those effects can be fully mitigated, the project can move forward with a negative declaration (ND) or mitigated negative declaration (MND). If the initial study finds the project has potential significant effects on the environment, then a full EIR is conducted.
- CEQA Exemptions: Categorical and Statutory. Some types of projects may be eligible for CEQA exemptions. If a project is exempt from CEQA, the lead agency simply identifies which exemption the project is eligible for, and no further environmental review or public engagement is required.
There are two types of CEQA exemptions— statutory and categorical. Statutory exemptions are created by the Legislature and apply even if a project has the potential to significantly affect the environment. In contrast, categorical exemptions, which are developed by the Office of Land Use and Climate Innovation (LCI) and approved by the Secretary of the Natural Resources Agency as part of the CEQA guidelines, generally do not apply if there are significant environmental impacts associated with the project. More specifically, categorical exemptions do not apply if (1) there is a reasonable possibility of a significant effect on the environment due to unusual circumstances; (2) significant cumulative impacts from projects of the same type will result; or (3) the project will have impacts on a uniquely sensitive environment.
There are over 120 statutory CEQA exemptions in the Public Resources Code, Water Code, Government Code, Health and Safety Code. There are also 33 categorical CEQA exemptions listed in the CEQA guidelines. However, these exemptions are almost exclusively for types of projects, not for specific projects.
- CEQA exemptions for rail projects. There are numerous CEQA exemptions that could apply for rail projects, including CEQA exemptions for: facility extensions up to four miles long to transfer passengers to transit services, and public projects for the construction, operation, or repair of zero emission and near-zero powertrain vehicles, rail or cable cars. This includes two CEQA exemptions for rail facilities that were passed through the Legislature last year in SB 71 (Chapter 742, Statutes of 2025) and SB 131 (Chapter 24, Statutes of 2025). The relevant portions of these two policies do, briefly, the following:
- SB 131 creates an exemption for construction, operation, or maintenance of high-speed rail projects that meet certain criteria, specifically that:
- The station is located within the resource study area of a previously certified environmental impact report prepared for a high-speed rail or passenger rail project
- The project incorporates all applicable mitigation measures identified in the previously certified environmental impact report.
- SB 131 creates an exemption for construction, operation, or maintenance of high-speed rail projects that meet certain criteria, specifically that:
- SB 71 (Wiener, Chapter 742, Statutes of 2025) Creates a CEQA exemption for public projects for rail facilities for zero-emission and for near zero emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. To be eligible for this rail facility project, the project must be located entirely within an existing public right-of-way and in an urban area.
- SB 71 (Wiener, Chapter 742, Statutes of 2025) Creates a CEQA exemption for public projects for rail facilities for zero-emission and for near zero emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. To be eligible for this rail facility project, the project must be located entirely within an existing public right-of-way and in an urban area.
This CEQA exemption also applies to certified Tier 4 or cleaner rolling stock or locomotives, except that the exemption does not need to be in an urban area: instead, the project cannot be located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone.
- Diridon Station. According to the City of San José’s website on the project, “Diridon Station, a key transit hub at the western edge of Downtown San José, will be expanded and redesigned to address the region's future transit needs. A collaboration among five public agencies – City of San José, Caltrain, Santa Clara Valley Transportation Authority (VTA), California High-Speed Rail Authority (CHSRA), and Metropolitan Transportation Commission (MTC) (collectively the “Partner Agencies”)– is underway to develop a comprehensive plan for the station. This initiative aims to improve the station's integration with the surrounding area, positioning it as a catalyst for both economic and community development. The goal of the project is to increase transit capacity and service, facilitate seamless transfers, and create a safe, passenger-friendly station.”[1]
The project was begun in 2023 with a two-year “Business Case” phase to assess project alternatives. Following a decision made May of 2025, according to the City website, the Partner Agencies began environmental review on the project, which is expected to take approximately three to four years.
Comments
- Purpose of Bill. According to the author, “SB 1375 is a targeted, project specific measure that recognizes the extensive environmental review already completed for major transit projects and adopted land use plans in the Diridon Station area.
“This exemption applies only to the Diridon Station Modernization Program in San Jose and maintains full compliance with all other environmental laws and permitting requirements. Advancing this project is critical for the region, as the modernized station will deliver significant environmental and mobility benefits by supporting mode shift from automobiles, reducing greenhouse gas emissions, and strengthening major rail and transit connections. It will also spur transit-oriented housing, mixed use development and create thousands of good jobs. SB 1375 responsibly saves time and public funds while enabling timely delivery of a key statewide mobility, climate, and economic asset.”
- Not reinventing the wheel. As discussed in the background section above, the Legislature passed two new statutory CEQA exemptions for rail stations in 2025. These are SB 71 (Wiener, Chapter 742, Statutes of 2025) for passenger rail stations for zero emission, near zero, and lower emission (Tier IV), and SB 131 (Chapter 24, Statutes of 2025) for high-speed rail stations. However, Diridon is not eligible for either of these exemptions.
Diridon station is not eligible for the CEQA exemption created in SB 71 because it is not in an existing ROW (it deviates from the existing ROW only in some areas, with about 20% of the area of the project outside of the ROW, according to information provided by the sponsors of the bill). While this is only one change from existing law, it is a significant deviation. For example, a portion of the Diridon station project that is not within the existing ROW would cut through a market-rate housing with more than 150 units—an outcome that would have been considered and open to public comment and mitigation measures if the project was fully in an existing ROW that had already undergone CEQA. Diridon station is also not eligible for the CEQA exemption under SB 131 because it does not meet all the necessary siting criteria, since parts of the project are located in a ‘natural and protected land’ as defined in SB 131.
Because Diridon station meets some but not all of the eligibility criteria for CEQA exemptions established for rail projects in SB 71 and SB 131, it cannot use these exemptions. However, the project does meet many of the criteria already listed in those exemptions, including that
- The rail is zero-emission, near-zero-emission, or a tier IV diesel passenger rail system;
- The project is in an urban area;
- The project is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone;
- The project is primarily in an existing ROW (a modification of the requirement in SB 71 that project be entirely located in an existing ROW).
- The project will be in compliance with the California Endangered Species Act (Fish and Game Code Section 2080 et seq.), California Fish and Game Code Section 1600 et seq., the Porter Cologne Water Quality Control Act and all applicable natural resource protection laws.
The author and committee may wish to strike the CEQA exemption for Diridon Station and instead create a new category of CEQA exemptions for a public urban, intermodal rail station within the statewide passenger rail network, at which high-capacity light, commuter, and intercity rail services converge that meets the criteria above in a-e, and further criteria outlined in comment 3 below.
- Mind the Gap. While a very detailed level of analysis would be needed to identify the potential environmental impacts associated with missing these requirements, it is clear that there will be a gap in understanding and mitigating environmental impacts resulting from the failure to meet these criteria.
Significantly, the Diridon Station is planned to cut through a newly built market-rate housing complex with 162 units and will be built next to existing housing, meaning that construction impacts could effect those nearby residents. Under CEQA, those affected residents would have an opportunity to engage in a public process, including making comments on the environmental review documents that the lead agency would have to respond to.
To ensure that the effects of the project on residents of the housing complex in the path of the project and other nearby residents are mitigated and justly compensated for, the author and committee may wish to add the additional eligibility criteria for the CEQA exemption:
- The project applicant will submit a plan to the lead agency that will identify how to fully address impacts related to construction;
- The project applicant will provide a plan to the lead agency on how any displacement from the project will be fully mitigated in line with federal and state relocation laws and including a plan to replace all lost units through new market-rate and affordable housing and specific commitments to provide assistance to residents facing displacement.
Moreover, the Diridon station, while in an infill area, is also in an existing conservation easement and near a creek. The impacts of the project on the natural resources at the site would ordinarily be reviewed through CEQA, which could include mitigation measures.
To ensure that all natural resources that might be impacted by the project, and that would have been considered under CEQA review, are protected, the author and committee may wish to require the project applicant to adopt a natural resource management plan to be eligible for the CEQA exemption. Natural resource management plans include identification of natural resources in an area, and plans to protect those resources, including avoiding impacts or mitigating impacts when necessary.
The Diridon station project will replace a historic stadium with a new one: impacts to historic structures under CEQA would be required to be evaluated and mitigated where possible. To protect the historic structure, the author and committee may wish to specify that eligibility for the CEQA exemption include a requirement that the project shall be in compliance with Section 106 of the National Historic Preservation Act of 1966.
By adopting these amendments, SB 1375 would allow the Diridon Station project to proceed, while adding important environmental guardrails to address some of the potential impacts to the surrounding communities and environs.
- Committee amendments. Staff recommends the committee adopt the bolded amendments contained in comment 5 above.
DOUBLE REFERRAL:
If this measure is approved by the Senate Environmental Quality Committee, the do pass motion must include the action to re-refer the bill to the Senate Transportation Committee.
Related/Prior Legislation
SB 71(Wiener, Chapter 742, Statutes of 2025) created a CEQA exemption for many transportation projects, including zero emission
SB 131 (Chapter 24, Statutes of 2025) created, among numerous other changes to CEQA, a CEQA exemption for high speed rail facilities meeting certain criteria including that the project is not located on natural and protected lands.
SOURCE:
Author
SUPPORT:
Bay Area Council
Calfornia-nevada Conference of Operating Engineers
City of San Jose
Greenbelt Alliance
International Union of Operating Engineers, Cal-nevada Conference
Metropolitan Transportation Commission
San Jose Chamber of Commerce
Santa Clara Valley Transportation Authority
Silicon Valley Bicycle Coalition
Streets for All
OPPOSITION:
None received
-- END --
The Future of Diridon Station, City of San José. https://www.diridonsj.org/ Accessed 4/5/2026 ↑
Discussed in Hearing
Senate Floor
Assembly Floor
Assembly Standing Committee on Natural Resources
Senate Floor
Senate Standing Committee on Transportation
Senate Standing Committee on Environmental Quality
Bill Author
Bill Co-Author(s):