SB 256: Electricity: electrical infrastructure: wildfire mitigation.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2025-07-17
Current Status:
In Progress
(2025-08-29: August 29 hearing: Held in committee and under submission.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities are under the direction of their governing boards. Existing law requires electrical corporations, electrical cooperatives, and local publicly owned electric utilities to construct, maintain, and operate their electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire, as specified. Existing law requires electrical corporations to annually prepare and submit wildfire mitigation plans to the Office of Energy Infrastructure Safety for review and approval. Existing law also requires local publicly owned electric utilities and electrical cooperatives to annually prepare wildfire mitigation plans and submit the plans to the California Wildfire Safety Advisory Board, as specified. Existing law requires that each wildfire mitigation plan include, among other things, a description of the preventive strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, and a description of the appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, as provided.
This bill would require the commission, on or before January 1, 2027, to update a general order to require each electrical corporation to remove all permanently abandoned facilities, as specified. The bill would require an electrical corporation, for areas affected by wildfire that require electrical distribution infrastructure to be rebuilt, to consider the undergrounding of electrical distribution infrastructure if it is determined to be cost effective compared to other wildfire mitigation strategies.
This bill would require an electrical corporation, for the description in the wildfire mitigation plan of the preventative strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, to include consideration of risks related to the wildland-urban interface. The bill would require an electrical corporation, for the description in the wildfire mitigation plan of the electrical corporations appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, to include consideration of enabling residents within a household who are not the customer of record to subscribe to receive notifications related to deenergization events and of communications with public safety partners, as provided. The bill would require that an electrical corporations wildfire mitigation plan also include a description of the processes and procedures that the electrical corporation use to coordinate communications with local governments within the service area of the electric corporation, and include an accounting of all transmission facilities, including permanently abandoned facilities, and include a plan for how and when each permanently abandoned facility will be removed and the wildfire mitigation measures that are being implemented to prevent hazards, as provided.
This bill would require local publicly owned electric utilities and electrical cooperatives, for the description in the wildfire mitigation plan of the preventative strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, to include consideration of risks related to the wildland-urban interface. The bill would require a local publicly owned electric utility or electrical cooperatives wildfire mitigation plan to include a description of the processes and procedures by which the local publicly owned electric utility or electrical cooperative coordinates communication with local governments within the service area of the local publicly owned electric utility or electrical cooperative, as specified.
Existing law, the California Emergency Services Act, establishes, within the office of the Governor, the Office of Emergency Services (OES) under the supervision of the Director of Emergency Services. Existing law requires OES to establish a standardized emergency management system for use by all emergency response agencies.
This bill would require certain electrical corporations and local publicly owned electric utilities, in cooperation with OES and other emergency service agencies, to establish procedures for the coordination of efforts between electrical corporations and local publicly owned electric utilities and their representatives and those of emergency response agencies. The bill would require these electrical corporations and local publicly owned electric utilities to assign liaison representatives to work within each state regional local operations center when requested by the state regional operations center, as provided.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing certain of this bills requirements would be a crime, the bill would impose a state-mandated local program.
Additionally, by imposing new duties on local publicly owned electric utilities, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities are under the direction of their governing boards. Existing law requires electrical corporations, electrical cooperatives, and local publicly owned electric utilities to construct, maintain, and operate their electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire, as specified. Existing law requires electrical corporations to annually prepare and submit wildfire mitigation plans to the Office of Energy Infrastructure Safety for review and approval. Existing law also requires local publicly owned electric utilities and electrical cooperatives to annually prepare wildfire mitigation plans and submit the plans to the California Wildfire Safety Advisory Board, as specified. Existing law requires that each wildfire mitigation plan include, among other things, a description of the preventive strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, and a description of the appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, as provided.
This bill would require the commission, on or before January 1, 2027, to update a general order to require each electrical corporation to remove all permanently abandoned facilities, as specified. The bill would require an electrical corporation, for areas affected by wildfire that require electrical distribution infrastructure to be rebuilt, to consider the undergrounding of electrical distribution infrastructure if it is determined to be cost effective compared to other wildfire mitigation strategies.
This bill would require an electrical corporation, for the description in the wildfire mitigation plan of the preventative strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, to include consideration of areas adjacent to high fire threat areas. risks related to the wildland-urban interface. The bill would require an electrical corporations corporation, for the description in the wildfire mitigation plan to consider the impacts on the opportunity for of the electrical corporations appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, to include consideration of enabling residents within a household who are not the customer of record to subscribe to receive notifications related to deenergization events and communication of communications with public safety partners, identify any lapses in communication coordination during recent past emergency response events with local governments, describe opportunities to collaborate with local governments and other steps that can be taken to establish more efficient communication coordination during future emergency responses, consider undergrounding distribution infrastructure when it is being rebuilt, partners, as provided. The bill would require that an electrical corporations wildfire mitigation plan also include a description of the processes and procedures that the electrical corporation use to coordinate communications with local governments within the service area of the electric corporation, and include an accounting of all transmission facilities, including permanently abandoned facilities, and include a plan for how and when each permanently abandoned facility will be removed and the wildfire mitigation measures that are being implemented to prevent hazards, as provided. The bill would also require electrical corporations to conduct annual wildfire preparedness workshops, as provided.
This bill would require local publicly owned electric utilities and electrical cooperatives, for the description in the wildfire mitigation plan of the preventative strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, to include consideration of risks related to the wildland-urban interface. The bill would require a local publicly owned electric utility or electrical cooperatives wildfire mitigation plan to include a description of the processes and procedures by which the local publicly owned electric utility or electrical cooperative coordinates communication with local governments within the service area of the local publicly owned electric utility or electrical cooperative, as specified.
Existing law prohibits the commission from allowing a large electrical corporation to include in its equity rate base its share of the first $5,000,000,000 expended in aggregate by large electrical corporations on fire risk mitigation capital expenditures included in the electrical corporations wildfire mitigation plans, as provided.This bill would additionally prohibit the commission from allowing a large electrical corporation to include in its equity rate base its share of a specified amount that the large electrical corporations collectively first expend on fire risk mitigation capital expenditures approved by the commission on or after January 1, 2025, as provided.Existing law, the California Emergency Services Act, establishes, within the office of the Governor, the Office of Emergency Services (OES) under the supervision of the Director of Emergency Services. Existing law requires OES to establish a standardized emergency management system for use by all emergency response agencies. Existing law requires that wildfire mitigation plans include appropriate and feasible procedures for notifying customers who may be impacted by the deenergizing of electrical lines and requires that the procedures direct notification to specified emergency and medical entities, as provided.
This bill would require certain electrical corporations and local publicly owned electric utilities, in cooperation with OES and other emergency service agencies, to establish procedures for the coordination of efforts between electrical corporations and local publicly owned electric utilities and their representatives and those of emergency response agencies. The bill would require these electrical corporations and local publicly owned electric utilities to assign representatives to work within each state regional operations center when requested by the state regional operations center, as provided.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing certain of this bills requirements would be a crime, the bill would impose a state-mandated local program.
Additionally, by imposing new duties on local publicly owned electric utilities, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities are under the direction of their governing boards. Existing law requires electrical corporations, electrical cooperatives, and local publicly owned electric utilities to construct, maintain, and operate their electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. wildfire, as specified. Existing law requires electrical corporations to annually prepare and submit wildfire mitigation plans to the Office of Energy Infrastructure Safety for review and approval. Existing law also requires a local publicly owned electric utility or utilities and electrical cooperative cooperatives to annually prepare a wildfire mitigation plan plans and submit the plan plans to the California Wildfire Safety Advisory Board, as specified. Existing law requires that a each wildfire mitigation plan include, among other things, a description of the preventive strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, and protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, as provided.
This bill would, for the description in the wildfire mitigation plan of the preventive strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, require electrical corporations, electrical cooperatives, and local publicly owned electric utilities to include consideration of areas adjacent to high fire threat areas. For an electrical corporations wildfire mitigation plan, the bill would require the protocols for disabling reclosers and deenergizing portions of the electrical distribution system to consider the impacts on the opportunity for residents within a household who are not the customer of record to subscribe to receive notifications related to deenergization events and communication with public safety partners that have the ability to coordinate with electrical corporations to provide broader messaging to affected communities. The bill would also require that an electrical corporations wildfire mitigation plan include, for areas affected by wildfires that require electrical distribution infrastructure to be rebuilt by an electrical corporation, consideration of undergrounding distribution infrastructure if it is determined to be cost effective compared to other wildfire mitigation strategies. The bill would require a wildfire mitigation plan to include an identification of any lapses in communication coordination during recent past emergency response events with local governments, as specified, and a description of any opportunities to collaborate with local governments, and other steps that can be taken to establish more efficient communication coordination during future emergency responses, as provided. The bill would require electrical corporations, electrical cooperatives, and local publicly owned electric utilities to conduct annual wildfire preparedness workshops in collaboration with and open to any local fire departments in their service areas to provide updates on the latest adopted wildfire mitigation plans, discuss any lapses in, and opportunities to increase efficiency of, communication coordination during emergency responses, and gather input for inclusion in the development of the next annual submission of their wildfire mitigation plans, as provided.This bill would require the commission, on or before January 1, 2027, to update a general order to require each electrical corporation to remove all permanently abandoned facilities, as specified.
This bill would require an electrical corporation, for the description in the wildfire mitigation plan of the preventative strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, to include consideration of areas adjacent to high fire threat areas. The bill would require an electrical corporations wildfire mitigation plan to consider the impacts on the opportunity for residents within a household who are not the customer of record to subscribe to receive notifications related to deenergization events and communication with public safety partners, identify any lapses in communication coordination during recent past emergency response events with local governments, describe opportunities to collaborate with local governments and other steps that can be taken to establish more efficient communication coordination during future emergency responses, consider undergrounding distribution infrastructure when it is being rebuilt, include an accounting of all transmission facilities, including permanently abandoned facilities, and include a plan for how and when each permanently abandoned facility will be removed and the wildfire mitigation measures that are being implemented to prevent hazards, as provided. The bill would also require electrical corporations to conduct annual wildfire preparedness workshops, as provided.
This bill would require local publicly owned electric utilities and electrical cooperatives, for the description in the wildfire mitigation plan of the preventative strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, to include consideration of risks related to the wildland-urban interface. The bill would require a local publicly owned electric utility or electrical cooperatives wildfire mitigation plan to include a description of the processes and procedures by which the local publicly owned electric utility or electrical cooperative coordinates communication with local governments within the service area of the local publicly owned electric utility or electrical cooperative, as specified.
Existing law prohibits the commission from allowing a large electrical corporation to include in its equity rate base its share of the first $5,000,000,000 expended in aggregate by large electrical corporations on fire risk mitigation capital expenditures included in the electrical corporations wildfire mitigation plans, as provided.
This bill would additionally prohibit the commission from allowing a large electrical corporation to include in its equity rate base its share of a specified amount that the large electrical corporations collectively first expend on fire risk mitigation capital expenditures approved by the commission on or after January 1, 2025, as provided.
Existing law, the California Emergency Services Act, establishes, within the office of the Governor, the Office of Emergency Services (OES) under the supervision of the Director of Emergency Services. Existing law makes OES responsible for addressing natural, technological, or man-made disasters and emergencies, including activities necessary to prevent, respond to, recover from, and mitigate the effects of emergencies and disasters to people and property. Existing law requires OES to establish a standardized emergency management system for use by all emergency response agencies. Existing law requires a that wildfire mitigation plan to plans include appropriate and feasible procedures for notifying a customer customers who may be impacted by the deenergizing of electrical lines and requires that the procedures direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure, specified emergency and medical entities, as provided. The commission has adopted specified guidelines that orders specified utilities to, among other things, ensure the public is able to access precise locality information of potential and active de-energization events, and that utility emergency operations center staff must receive annual emergency management training, as specified.
This bill would require all certain electrical corporations and local publicly owned electric utilities that have service areas that overlap with the boundaries of a state regional emergency operations center, utilities, in cooperation with OES, OES and other emergency service agencies, to establish procedures for the coordination of efforts between electrical corporations and local publicly owned electric utilities and their representatives and those of emergency response agencies. The bill would require these electrical corporations and local publicly owned electric utilities to assign a representative representatives to work within each state regional operations center that has boundaries that overlap with the electrical corporations or local publicly owned electric utilitys service area. The bill would require the representative to complete the appropriate Standardized Emergency Management System training. center, as provided.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing certain of this bills requirements would be a crime, the bill would impose a state-mandated local program.
Additionally, by imposing new duties on local publicly owned electric utilities, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities are under the direction of their governing boards. Existing law requires electrical corporations, electrical cooperatives, and local publicly owned electric utilities to construct, maintain, and operate their electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. Existing law requires electrical corporations to annually prepare and submit wildfire mitigation plans to the Office of Energy Infrastructure Safety for review and approval. Existing law also requires a local publicly owned electric utility or electrical cooperative to annually prepare a wildfire mitigation plan and submit the plan to the California Wildfire Safety Advisory Board, as specified. Existing law requires that a wildfire mitigation plan include, among other things, a description of the preventive strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires. wildfires, and protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, as provided.
This bill would, for the description in the wildfire mitigation plan of the preventive strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, require electrical corporations, electrical cooperatives, and local publicly owned electric utilities to include consideration of low-risk areas. areas adjacent to high fire threat areas. For an electrical corporations wildfire mitigation plan, the bill would require the protocols for disabling reclosers and deenergizing portions of the electrical distribution system to consider the impacts on the opportunity for residents within a household who are not the customer of record to subscribe to receive notifications related to deenergization events and communication with public safety partners that have the ability to coordinate with electrical corporations to provide broader messaging to affected communities. The bill would also require that an electrical corporations wildfire mitigation plan include, for areas affected by wildfires that require electrical distribution infrastructure to be rebuilt by an electrical corporation, consideration of undergrounding distribution infrastructure if it is determined to be cost effective compared to other wildfire mitigation strategies. The bill would require a wildfire mitigation plan to include an identification of any lapses in communication coordination during recent past emergency response events with local governments, as specified, and a description of any opportunities to collaborate with local governments, and other steps that can be taken to establish more efficient communication coordination during future emergency responses, as provided. The bill would require electrical corporations, electrical cooperatives, and local publicly owned electric utilities to conduct annual wildfire preparedness workshops in collaboration with and open to any local fire departments in their service areas to provide updates on the latest adopted wildfire mitigation plans, discuss any lapses in, and opportunities to increase efficiency of, communication coordination during emergency responses, and gather input for inclusion in the development of the next annual submission of their wildfire mitigation plans, as provided.
Existing law requires the commission to establish an expedited utility distribution infrastructure undergrounding program that large electrical corporations, as defined, may participate in by submitting to the Office of Energy Infrastructure Safety a distribution infrastructure undergrounding plan that includes specified things, including, among others, a 10-year plan for undergrounding distribution infrastructure. Existing law requires the office to publish the plan for public comment, and, within 9 months, review and approve or deny the plan. Existing law requires, upon the office approving a plan, the large electrical corporation to submit to the commission a copy and an application requesting review and conditional approval of the plans costs, as provided. Existing law requires the office to issue a safety certification to an electrical corporation that provides documentation of specified things, including that the electrical corporation has an approved wildfire mitigation plan.This bill would require the commission to require all electrical corporations to participate in the program, as specified. The bill would require the commission to coordinate with the office to make participation in the program a requirement for obtaining the above-described safety certification. The bill would require the commission to adopt a decision on the financing of infrastructure projects conducted pursuant to the program that implements a revised return on equity structure for electrical corporations that caps the maximum allowable return on capital investment at a set percentage for undergrounding and that may include either securitization for specific projects, as specified, or public-private partnerships or public ownership models. The bill would require the commission to ensure that this decision leads to reduced long-term expenses for customers.Existing law prohibits the commission from allowing a large electrical corporation to include in its equity rate base its share of the first $5,000,000,000 expended in aggregate by large electrical corporations on fire risk mitigation capital expenditures included in the electrical corporations wildfire mitigation plans, as provided.
This bill would additionally prohibit the commission from allowing a large electrical corporation to include in its equity rate base its share of a specified amount that the large electrical corporations collectively first expend on fire risk mitigation capital expenditures approved by the commission on or after January 1, 2025, as provided.
Existing law, the California Emergency Services Act, establishes, within the office of the Governor, the Office of Emergency Services (OES) under the supervision of the Director of Emergency Services. Existing law makes OES responsible for addressing natural, technological, or man-made disasters and emergencies, including activities necessary to prevent, respond to, recover from, and mitigate the effects of emergencies and disasters to people and property. Existing law requires OES to establish a standardized emergency management system for use by all emergency response agencies. Existing law requires a wildfire mitigation plan to include appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines and requires that the procedures direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure, as provided. The commission has adopted specified guidelines that orders specified utilities to, among other things, ensure the public is able to access precise locality information of potential and active de-energization events, and that utility emergency operations center staff must receive annual emergency management training, as specified.
This bill would require all electrical corporations and local publicly owned electric utilities that have service areas that overlap with the boundaries of a state regional emergency operations center, in cooperation with OES, and other emergency service agencies, to establish procedures for the coordination of efforts between electrical corporations and local publicly owned electric utilities and their representatives and those of emergency response agencies. The bill would require these electrical corporations and local publicly owned electric utilities to assign a representative to work within each state regional operations center that has boundaries that overlap with the electrical corporations or local publicly owned electric utilitys service area. The bill would require the representative to complete the appropriate Standardized Emergency Management System training. The bill would require the commission to update the guidelines adopted in the above-described decision to require each electrical corporation and local publicly owned electric utility to establish a means for notifying customers and noncustomers located in an area subject to a public safety power shutoff that is accomplished in partnership with OES through the use of the Emergency Alert System and update to the alert and warning guidelines, as specified. The bill would require the means of notification to do specified things, including be designed to be an alert that allows customers or noncustomers to opt out of receiving future alerts and include specified things including a procedure that notifies customers and noncustomers of the expected or estimated time of service restoration, as specified.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing certain of this bills requirements would be a crime, the bill would impose a state-mandated local program.
Additionally, by imposing new duties on local publicly owned electric utilities, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission to implement and enforce standards for the maintenance and operation of facilities for the generation and storage of electricity owned by an electrical corporation or located in the state to ensure their reliable operation. corporations, while local publicly owned electric utilities are under the direction of their governing boards. Existing law requires electrical corporations, electrical cooperatives, and local publicly owned electric utilities to construct, maintain, and operate their electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. Existing law requires electrical corporations to annually prepare and submit wildfire mitigation plans to the Office of Energy Infrastructure Safety for review and approval. Existing law also requires a local publicly owned electric utility or electrical cooperative to annually prepare a wildfire mitigation plan and submit the plan to the California Wildfire Safety Advisory Board, as specified. Existing law requires that a wildfire mitigation plan include, among other things, a description of the preventive strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires.
This bill would, for the description in the wildfire mitigation plan of the preventive strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, require electrical corporations, electrical cooperatives, and local publicly owned electric utilities to include consideration of low-risk areas. The bill would require a wildfire mitigation plan to include an identification of any lapses in communication coordination during recent past emergency response events with local governments, as specified, and a description of any opportunities to collaborate with local governments, and other steps that can be taken to establish more efficient communication coordination during future emergency responses, as provided. The bill would require electrical corporations, electrical cooperatives, and local publicly owned electric utilities to conduct annual wildfire preparedness workshops in collaboration with and open to any local fire departments in their service areas to provide updates on the latest adopted wildfire mitigation plans, discuss any lapses in, and opportunities to increase efficiency of, communication coordination during emergency responses, and gather input for inclusion in the development of the next annual submission of their wildfire mitigation plans, as provided.
Existing law requires the commission to establish an expedited utility distribution infrastructure undergrounding program that large electrical corporations, as defined, may participate in by submitting to the Office of Energy Infrastructure Safety a distribution infrastructure undergrounding plan that includes specified things, including, among others, a 10-year plan for undergrounding distribution infrastructure. Existing law requires the office to publish the plan for public comment, and, within 9 months, review and approve or deny the plan. Existing law requires, upon the office approving a plan, the large electrical corporation to submit to the commission a copy and an application requesting review and conditional approval of the plans costs, as provided. Existing law requires the office to issue a safety certification to an electrical corporation that provides documentation of specified things, including that the electrical corporation has an approved wildfire mitigation plan.
This bill would require the commission to require all electrical corporations to participate in the program, as specified. The bill would require the commission to coordinate with the office to make participation in the program a requirement for obtaining the above-described safety certification. The bill would require the commission to adopt a decision on the financing of infrastructure projects conducted pursuant to the program that implements a revised return on equity structure for electrical corporations that caps the maximum allowable return on capital investment at a set percentage for undergrounding and that may include either securitization for specific projects, as specified, or public-private partnerships or public ownership models. The bill would require the commission to ensure that this decision leads to reduced long-term expenses for customers.
Existing law, the California Emergency Services Act, establishes, within the office of the Governor, the Office of Emergency Services (OES) under the supervision of the Director of Emergency Services. Existing law makes OES responsible for addressing natural, technological, or man-made disasters and emergencies, including activities necessary to prevent, respond to, recover from, and mitigate the effects of emergencies and disasters to people and property. Existing law requires OES to establish a standardized emergency management system for use by all emergency response agencies. Existing law requires a wildfire mitigation plan to include appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines and requires that the procedures direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure, as provided. The commission has adopted specified guidelines that orders specified utilities to, among other things, ensure the public is able to access precise locality information of potential and active de-energization events, and that utility emergency operations center staff must receive annual emergency management training, as specified.
This bill would require all electrical corporations and local publicly owned electric utilities that have service areas that overlap with the boundaries of a state regional emergency operations center, in cooperation with OES, and other emergency service agencies, to establish procedures for the coordination of efforts between electrical corporations and local publicly owned electric utilities and their representatives and those of emergency response agencies. The bill would require these electrical corporations and local publicly owned electric utilities to assign a representative to work within each state regional operations center that has boundaries that overlap with the electrical corporations or local publicly owned electric utilitys service area. The bill would require the representative to complete the appropriate Standardized Emergency Management System training. The bill would require the commission to update the guidelines adopted in the above-described decision to require each electrical corporation and local publicly owned electric utility to establish a means for notifying customers and noncustomers located in an area subject to a public safety power shutoff that is accomplished in partnership with OES through the use of the Emergency Alert System and update to the alert and warning guidelines, as specified. The bill would require the means of notification to do specified things, including be designed to be an alert that allows customers or noncustomers to opt out of receiving future alerts and include specified things including a procedure that notifies customers and noncustomers of the expected or estimated time of service restoration, as specified.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing certain of this bills requirements would be a crime, the bill would impose a state-mandated local program.
Additionally, by imposing new duties on local publicly owned electric utilities, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
This bill would state the intent of the Legislature to enact legislation to enhance the resiliency and reliability of Californias electrical infrastructure in areas prone to wildfires, earthquakes, and other natural disasters by requiring electrical utilities to prioritize the undergrounding of power lines, the implementation of microgrid technologies, and the strengthening of public safety power shutoff standards and accountability, while ensuring the utilization of labor standards that promote a skilled workforce, and providing the commission with the ability to immediately access all relevant electrical fault data related to natural disasters.Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission to implement and enforce standards for the maintenance and operation of facilities for the generation and storage of electricity owned by an electrical corporation or located in the state to ensure their reliable operation.
This bill would state the intent of the Legislature to enact legislation to enhance the resiliency and reliability of Californias electrical infrastructure in areas prone to wildfires, earthquakes, and other natural disasters by requiring electrical utilities to prioritize the undergrounding of power lines, the implementation of microgrid technologies, and the strengthening of public safety power shutoff standards and accountability, while ensuring the utilization of labor standards that promote a skilled workforce, and providing the commission with the ability to immediately access all relevant electrical fault data related to natural disasters.
The Legislature finds and declares both of the following:
(a)To ensure safety and affordability in the face of catastrophic wildfires in the State of California, it is the intent of the Legislature to find sustainable ways to finance mitigation strategies for ratepayers and Californians.
(b)It is the intent of the Legislature that fire risk mitigation capital expenditures, including the decommissioning of permanently abandoned facilities and the undergrounding of electrical distribution infrastructure after a wildfire event, be financed in ways that reduce the impact to ratepayers.
SEC. 2.Section 762.8 is added to the Public Utilities Code, to read:762.8.(a)On or before January 1, 2027, the commission shall update General Order No. 95, as revised on December 19, 2024, by commission Resolution ESRB-12, to require each electrical corporation to remove all permanently abandoned facilities in order to prevent public nuisances or hazards to life or property.
(b)The commission shall ensure all applicable safety requirements, including wildfire mitigation measures, apply to permanently abandoned facilities until they are removed.
(c)This section does not, and the update required pursuant to subdivision (a) shall not, impact an electrical corporations right to an easement.
(d)For purposes of this section, permanently abandoned facility means a facility that is out of service and the owner cannot demonstrate, with appropriate documentation, an intent to place the facility, or portions of the facility, into service within a time determined by the commission.
SEC. 3.Section 8386 of the Public Utilities Code is amended to read:8386.(a)Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.
(b)Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division for review and approval. In calendar year 2020, and thereafter, the plan shall cover at least a three-year period. The division shall establish a schedule for the submission of subsequent comprehensive wildfire mitigation plans, which may allow for the staggering of compliance periods for each electrical corporation. In its discretion, the division may allow the annual submissions to be updates to the last approved comprehensive wildfire mitigation plan; provided, that each electrical corporation shall submit a comprehensive wildfire mitigation plan at least once every three years.
(c)The wildfire mitigation plan shall include all of the following:
(1)An accounting of the responsibilities of persons responsible for executing the plan.
(2)The objectives of the plan.
(3)A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of dynamic climate change risks and risks related to the wildland-urban interface.
(4)A description of the metrics the electrical corporation plans to use to evaluate the plans performance and the assumptions that underlie the use of those metrics.
(5)A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.
(6)A description of the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of these protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on all of the following:
(A)Critical first responders.
(B)Health and communication infrastructure.
(C)Customers who receive medical baseline allowances pursuant to subdivision (c) of Section 739. The electrical corporation may deploy backup electrical resources or provide financial assistance for backup electrical resources to a customer receiving a medical baseline allowance for a customer who meets all of the following requirements:
(i)The customer relies on life-support equipment that operates on electricity to sustain life.
(ii)The customer demonstrates financial need, including through enrollment in the California Alternate Rates for Energy program continued pursuant to Section 739.1.
(iii)The customer is not eligible for backup electrical resources provided through medical services, medical insurance, or community resources.
(D)Subparagraph (C) shall not be construed as preventing an electrical corporation from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.
(7)(A)A description of the electrical corporations appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including procedures for those customers receiving medical baseline allowances as described in paragraph (6). The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event. The procedures shall comply with any orders of the commission regarding notifications of deenergization events.
(B)The procedures shall include consideration of enabling residents within a household who are not the customer of record to subscribe to receive notifications related to deenergization events.
(C)The procedures shall include consideration of communications with public safety partners who have the ability to coordinate with the electrical corporation to provide broader messaging to affected communities.
(8)Identification of circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits, including, but not limited to, the estimated annual decline in circuit deenergization and deenergization impact on customers, and replacing, hardening, or undergrounding any portion of the circuit or of upstream transmission or distribution lines.
(9)Plans for vegetation management.
(10)Plans for inspections of the electrical corporations electrical infrastructure.
(11)A description of the electrical corporations protocols for the deenergization of the electrical corporations transmission infrastructure, for instances when the deenergization may impact customers who, or entities that, are dependent upon the infrastructure. The protocols shall comply with any order of the commission regarding deenergization events.
(12)A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporations service territory, including all relevant wildfire risk and risk mitigation information that is part of the commissions Safety Model Assessment Proceeding (A.15-05-002, et al.) and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:
(A)Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporations equipment and facilities.
(B)Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporations service territory.
(13)A description of how the plan accounts for the wildfire risk identified in the electrical corporations Risk Assessment Mitigation Phase filing.
(14)A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulating of distribution wires, and replacing poles.
(15)A description of where and how the electrical corporation considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a commission fire threat map.
(16)A showing that the electrical corporation has an adequately sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the electrical corporation.
(17)Identification of any geographic area in the electrical corporations service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.
(18)A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.
(19)A description of how the plan is consistent with the electrical corporations disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:
(A)Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.
(B)Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.
(20)A statement of how the electrical corporation will restore service after a wildfire.
(21)Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to electrical corporation representatives, and emergency communications.
(22)A description of the processes and procedures the electrical corporation will use to do all of the following:
(A)Monitor and audit the implementation of the plan.
(B)Identify any deficiencies in the plan or the plans implementation and correct those deficiencies.
(C)Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.
(23)Any other information that the Wildfire Safety Division may require.
(24)A description of the processes and procedures that the electrical corporation uses to coordinate its communications with local governments within the service area of the electric corporation, including fire officials and emergency response officials, as part of the preparation of the wildfire mitigation plan and during a wildfire-related emergencies.
(25)(A)An accounting of all transmission facilities, including a list of facilities that are in service, facilities that are out of service, and permanently abandoned facilities that are transmission facilities. For permanently abandoned facilities that are transmission facilities, the accounting shall include a plan for how and when each facility will be removed and the wildfire mitigation measures that are being implemented to prevent hazards, including, but not limited to, induction.
(B)For purposes of this paragraph, permanently abandoned facilities has the same meaning as defined in Section 762.8.
(d)The Wildfire Safety Division shall post all wildfire mitigation plans and annual updates on the commissions internet website before July 1, 2021, and on the offices internet website beginning July 1, 2021, for no less than two months before the divisions or offices decision regarding approval of the plan. The division or office shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.
SEC. 4.Section 8387 of the Public Utilities Code is amended to read:8387.(a)Each local publicly owned electric utility and electrical cooperative shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of wildfire posed by those electrical lines and equipment.
(b)(1)The local publicly owned electric utility or electrical cooperative shall, before January 1, 2020, prepare a wildfire mitigation plan. After January 1, 2020, a local publicly owned electric utility or electrical cooperative shall prepare a wildfire mitigation plan annually and shall submit the plan to the California Wildfire Safety Advisory Board on or before July 1 of that calendar year. Each local publicly owned electric utility and electrical cooperative shall update its plan annually and submit the update to the California Wildfire Safety Advisory Board by July 1 of each year. At least once every three years, the submission shall be a comprehensive revision of the plan.
(2)The wildfire mitigation plan shall consider as necessary, at minimum, all of the following:
(A)An accounting of the responsibilities of persons responsible for executing the plan.
(B)The objectives of the wildfire mitigation plan.
(C)A description of the preventive strategies and programs to be adopted by the local publicly owned electric utility or electrical cooperative to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of dynamic climate change risks and risks related to the wildland-urban interface.
(D)A description of the metrics the local publicly owned electric utility or electrical cooperative plans to use to evaluate the wildfire mitigation plans performance and the assumptions that underlie the use of those metrics.
(E)A discussion of how the application of previously identified metrics to previous wildfire mitigation plan performances has informed the wildfire mitigation plan.
(F)Protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, as well as protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communication infrastructure.
(G)Appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines. The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event.
(H)Plans for vegetation management.
(I)Plans for inspections of the local publicly owned electric utilitys or electrical cooperatives electrical infrastructure.
(J)A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the local publicly owned electric utilitys or electrical cooperatives service territory. The list shall include, but not be limited to, both of the following:
(i)Risks and risk drivers associated with design, construction, operation, and maintenance of the local publicly owned electric utilitys or electrical cooperatives equipment and facilities.
(ii)Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the local publicly owned electric utilitys or electrical cooperatives service territory.
(K)Identification of any geographic area in the local publicly owned electric utilitys or electrical cooperatives service territory that is a higher wildfire threat than is identified in a commission fire threat map, and identification of where the commission should expand a high fire-threat district based on new information or changes to the environment.
(L)A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk.
(M)A statement of how the local publicly owned electric utility or electrical cooperative will restore service after a wildfire.
(N)A description of the processes and procedures the local publicly owned electric utility or electrical cooperative shall use to do all of the following:
(i)Monitor and audit the implementation of the wildfire mitigation plan.
(ii)Identify any deficiencies in the wildfire mitigation plan or its implementation, and correct those deficiencies.
(iii)Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, that are carried out under the plan, other applicable statutes, or commission rules.
(O)A description of the processes and procedures by which the local publicly owned electric utility or electrical cooperative coordinates communication with local governments within the service area of the local publicly owned electric utility or electrical cooperative, including fire officials and emergency response officials, as part of the preparation of the wildfire mitigation plan and during a wildfire-related emergency.
(3)The local publicly owned electric utility or electrical cooperative shall, on or before January 1, 2020, and not less than annually thereafter, present its wildfire mitigation plan in an appropriately noticed public meeting. The local publicly owned electric utility or electrical cooperative shall accept comments on its wildfire mitigation plan from the public, other local and state agencies, and interested parties, and shall verify that the wildfire mitigation plan complies with all applicable rules, regulations, and standards, as appropriate.
(c)The local publicly owned electric utility or electrical cooperative shall contract with a qualified independent evaluator with experience in assessing the safe operation of electrical infrastructure to review and assess the comprehensiveness of its wildfire mitigation plan. The independent evaluator shall issue a report that shall be made available on the internet website of the local publicly owned electric utility or electrical cooperative, and shall present the report at a public meeting of the local publicly owned electric utilitys or electrical cooperatives governing board.
SEC. 5.Section 8387.6 is added to the Public Utilities Code, to read:8387.6.For areas affected by wildfires that require electrical distribution infrastructure to be rebuilt by an electrical corporation, the electrical corporation shall consider the undergrounding of electrical distribution infrastructure if it is determined to be cost effective compared to other wildfire mitigation strategies.
SEC. 6.Chapter 8 (commencing with Section 8395) is added to Division 4.1 of the Public Utilities Code, to read:8.Regional Emergency Operations8395.(a)All electrical corporations and local publicly owned electric utilities that have a service area that overlaps with the boundaries of a state regional emergency local operations center, in cooperation with the Office of Emergency Services and other emergency service agencies, shall establish procedures for the coordination of efforts between electrical corporations and local publicly owned electric utilities and their representatives and those of emergency response agencies.
(b)All electrical corporations and local publicly owned electric utilities subject to subdivision (a) shall assign a liaison representative to work within each state regional local operations center that has boundaries that overlap with the electrical corporations or local publicly owned electric utilitys service area when requested by the state regional operations center. area. The representative shall complete the appropriate annual emergency management training, sufficient to enable them to perform their assigned role, that is provided under the Standardized Emergency Management System framework, and National Incident Management System trainings sufficient to enable them to assist activated emergency operations centers, to the fullest extent possible.
SEC. 7.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares both of the following:
(a)To ensure safety and affordability in the face of catastrophic wildfires in the State of California, it is the intent of the Legislature to find sustainable ways to finance mitigation strategies for ratepayers and Californians.
(b)It is the intent of the Legislature that fire risk mitigation capital expenditures, including the decommissioning of permanently abandoned facilities and the undergrounding of electrical distribution infrastructure after a wildfire event, be financed in ways that reduce the impact to ratepayers.
SECTION 1.SEC. 2.Section 762.8 is added to the Public Utilities Code, to read:762.8.(a)On or before January 1, 2027, the commission shall update General Order No.95, No. 95, as revised on December 19, 2024, by commission Resolution ESRB-12, to require each electrical corporation to remove all permanently abandoned facilities in order to prevent public nuisances or hazards to life or property.
(b)The commission shall ensure all applicable safety requirements, including wildfire mitigation measures, apply to permanently abandoned facilities until they are removed.
(c)This section does not, and the update required pursuant to subdivision (a) shall not, impact an electrical corporations right to an easement.
(d)For purposes of this section, permanently abandoned facility means a facility that is out of service and the owner cannot demonstrate, with appropriate documentation, an intent to place the facility, or portions of the facility, into service within three years. a time determined by the commission.
SEC. 2.SEC. 3.Section 8386 of the Public Utilities Code is amended to read:8386.(a)Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.
(b)Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division for review and approval. In calendar year 2020, and thereafter, the plan shall cover at least a three-year period. The division shall establish a schedule for the submission of subsequent comprehensive wildfire mitigation plans, which may allow for the staggering of compliance periods for each electrical corporation. In its discretion, the division may allow the annual submissions to be updates to the last approved comprehensive wildfire mitigation plan; provided, that each electrical corporation shall submit a comprehensive wildfire mitigation plan at least once every three years.
(c)The wildfire mitigation plan shall include all of the following:
(1)An accounting of the responsibilities of persons responsible for executing the plan.
(2)The objectives of the plan.
(3)A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of areas adjacent to high fire threat areas and dynamic climate change risks. risks and risks related to the wildland-urban interface.
(4)A description of the metrics the electrical corporation plans to use to evaluate the plans performance and the assumptions that underlie the use of those metrics.
(5)A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.
(6)A description of the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of these protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on all of the following:
(A)Critical first responders.
(B)Health and communication infrastructure.
(C)Customers who receive medical baseline allowances pursuant to subdivision (c) of Section 739. The electrical corporation may deploy backup electrical resources or provide financial assistance for backup electrical resources to a customer receiving a medical baseline allowance for a customer who meets all of the following requirements:
(i)The customer relies on life-support equipment that operates on electricity to sustain life.
(ii)The customer demonstrates financial need, including through enrollment in the California Alternate Rates for Energy program continued pursuant to Section 739.1.
(iii)The customer is not eligible for backup electrical resources provided through medical services, medical insurance, or community resources.
(D)Subparagraph (C) shall not be construed as preventing an electrical corporation from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.
(E)The opportunity for residents within a household who are not the customer of record to subscribe to receive notifications related to deenergization events.(F)Communication with public safety partners who have the ability to coordinate with the electrical corporation to provide broader messaging to affected communities.(7)(A)A description of the electrical corporations appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including procedures for those customers receiving medical baseline allowances as described in paragraph (6). The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event. The procedures shall comply with any orders of the commission regarding notifications of deenergization events.
(B)The procedures shall include consideration of enabling residents within a household who are not the customer of record to subscribe to receive notifications related to deenergization events.
(C)The procedures shall include consideration of communications with public safety partners who have the ability to coordinate with the electrical corporation to provide broader messaging to affected communities.
(8)Identification of circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits, including, but not limited to, the estimated annual decline in circuit deenergization and deenergization impact on customers, and replacing, hardening, or undergrounding any portion of the circuit or of upstream transmission or distribution lines.
(9)Plans for vegetation management.
(10)Plans for inspections of the electrical corporations electrical infrastructure.
(11)A description of the electrical corporations protocols for the deenergization of the electrical corporations transmission infrastructure, for instances when the deenergization may impact customers who, or entities that, are dependent upon the infrastructure. The protocols shall comply with any order of the commission regarding deenergization events.
(12)A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporations service territory, including all relevant wildfire risk and risk mitigation information that is part of the commissions Safety Model Assessment Proceeding (A.15-05-002, et al.) and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:
(A)Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporations equipment and facilities.
(B)Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporations service territory.
(13)A description of how the plan accounts for the wildfire risk identified in the electrical corporations Risk Assessment Mitigation Phase filing.
(14)A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulating of distribution wires, and replacing poles.
(15)A description of where and how the electrical corporation considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a commission fire threat map.
(16)A showing that the electrical corporation has an adequately sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the electrical corporation.
(17)Identification of any geographic area in the electrical corporations service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.
(18)A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.
(19)A description of how the plan is consistent with the electrical corporations disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:
(A)Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.
(B)Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.
(20)A statement of how the electrical corporation will restore service after a wildfire.
(21)Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to electrical corporation representatives, and emergency communications.
(22)A description of the processes and procedures the electrical corporation will use to do all of the following:
(A)Monitor and audit the implementation of the plan.
(B)Identify any deficiencies in the plan or the plans implementation and correct those deficiencies.
(C)Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.
(23)Any other information that the Wildfire Safety Division may require.
(24)(A)Identification of any lapses in communication coordination during recent past emergency response events with local governments within the service area of the electrical corporation.(B)A description of any opportunities to collaborate with local governments, including county fire officials, and other steps that can be taken to establish more efficient communication coordination during future emergency responses.(25)For areas affected by wildfires that require electrical distribution infrastructure to be rebuilt by an electrical corporation, consideration of undergrounding distribution infrastructure if it is determined to be cost effective compared to other wildfire mitigation strategies.(24)A description of the processes and procedures that the electrical corporation uses to coordinate its communications with local governments within the service area of the electric corporation, including fire officials and emergency response officials, as part of the preparation of the wildfire mitigation plan and during a wildfire-related emergencies.
(26)(25)(A)An accounting of all transmission facilities, including a list of facilities that are in service, facilities that are out of service, and permanently abandoned facilities that are transmission facilities. For permanently abandoned facilities that are transmission facilities, the accounting shall include a plan for how and when each facility will be removed and the wildfire mitigation measures that are being implemented to prevent hazards, including, but not limited to, induction.
(B)For purposes of this paragraph, permanently abandoned facilities has the same meaning as defined in Section 762.8.
(d)The Wildfire Safety Division shall post all wildfire mitigation plans and annual updates on the commissions internet website before July 1, 2021, and on the offices internet website beginning July 1, 2021, for no less than two months before the divisions or offices decision regarding approval of the plan. The division or office shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.
(e)(1)The electrical corporation shall conduct an annual wildfire preparedness workshop in collaboration with and open to any local fire department in its service area to provide updates on the latest adopted wildfire mitigation plan required by this section, discuss any lapses in, and opportunities to increase efficiency of, communication coordination during emergency responses pursuant to paragraph (24) of subdivision (c), and gather input for inclusion in the development of the next annual submission of the wildfire mitigation plan required pursuant to subdivision (b).(2)The electrical corporation shall incorporate relevant information obtained from the workshop required pursuant to paragraph (1) into the emergency and disaster preparedness plan required pursuant to Section 768.6.SEC. 3.Section 8386.9 is added to the Public Utilities Code, to read:8386.9.The commission shall not allow a large electrical corporation to include in its equity rate base its share, as determined pursuant to the Wildfire Fund allocation metric specified in Section 3280, of the amount specified by subdivision (e) of Section 8386.3 that the large electrical corporations collectively first expend on fire risk mitigation capital expenditures approved by the commission on or after January 1, 2025.SEC. 4.Section 8387 of the Public Utilities Code is amended to read:8387.(a)Each local publicly owned electric utility and electrical cooperative shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of wildfire posed by those electrical lines and equipment.
(b)(1)The local publicly owned electric utility or electrical cooperative shall, before January 1, 2020, prepare a wildfire mitigation plan. After January 1, 2020, a local publicly owned electric utility or electrical cooperative shall prepare a wildfire mitigation plan annually and shall submit the plan to the California Wildfire Safety Advisory Board on or before July 1 of that calendar year. Each local publicly owned electric utility and electrical cooperative shall update its plan annually and submit the update to the California Wildfire Safety Advisory Board by July 1 of each year. At least once every three years, the submission shall be a comprehensive revision of the plan.
(2)The wildfire mitigation plan shall consider as necessary, at minimum, all of the following:
(A)An accounting of the responsibilities of persons responsible for executing the plan.
(B)The objectives of the wildfire mitigation plan.
(C)A description of the preventive strategies and programs to be adopted by the local publicly owned electric utility or electrical cooperative to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of dynamic climate change risks and risks related to the wildland-urban interface.
(D)A description of the metrics the local publicly owned electric utility or electrical cooperative plans to use to evaluate the wildfire mitigation plans performance and the assumptions that underlie the use of those metrics.
(E)A discussion of how the application of previously identified metrics to previous wildfire mitigation plan performances has informed the wildfire mitigation plan.
(F)Protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, as well as protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communication infrastructure.
(G)Appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines. The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event.
(H)Plans for vegetation management.
(I)Plans for inspections of the local publicly owned electric utilitys or electrical cooperatives electrical infrastructure.
(J)A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the local publicly owned electric utilitys or electrical cooperatives service territory. The list shall include, but not be limited to, both of the following:
(i)Risks and risk drivers associated with design, construction, operation, and maintenance of the local publicly owned electric utilitys or electrical cooperatives equipment and facilities.
(ii)Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the local publicly owned electric utilitys or electrical cooperatives service territory.
(K)Identification of any geographic area in the local publicly owned electric utilitys or electrical cooperatives service territory that is a higher wildfire threat than is identified in a commission fire threat map, and identification of where the commission should expand a high fire-threat district based on new information or changes to the environment.
(L)A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk.
(M)A statement of how the local publicly owned electric utility or electrical cooperative will restore service after a wildfire.
(N)A description of the processes and procedures the local publicly owned electric utility or electrical cooperative shall use to do all of the following:
(i)Monitor and audit the implementation of the wildfire mitigation plan.
(ii)Identify any deficiencies in the wildfire mitigation plan or its implementation, and correct those deficiencies.
(iii)Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, that are carried out under the plan, other applicable statutes, or commission rules.
(O)A description of the processes and procedures by which the local publicly owned electric utility or electrical cooperative coordinates communication with local governments within the service area of the local publicly owned electric utility or electrical cooperative, including fire officials and emergency response officials, as part of the preparation of the wildfire mitigation plan and during a wildfire-related emergency.
(3)The local publicly owned electric utility or electrical cooperative shall, on or before January 1, 2020, and not less than annually thereafter, present its wildfire mitigation plan in an appropriately noticed public meeting. The local publicly owned electric utility or electrical cooperative shall accept comments on its wildfire mitigation plan from the public, other local and state agencies, and interested parties, and shall verify that the wildfire mitigation plan complies with all applicable rules, regulations, and standards, as appropriate.
(c)The local publicly owned electric utility or electrical cooperative shall contract with a qualified independent evaluator with experience in assessing the safe operation of electrical infrastructure to review and assess the comprehensiveness of its wildfire mitigation plan. The independent evaluator shall issue a report that shall be made available on the internet website of the local publicly owned electric utility or electrical cooperative, and shall present the report at a public meeting of the local publicly owned electric utilitys or electrical cooperatives governing board.
SEC. 5.Section 8387.6 is added to the Public Utilities Code, to read:8387.6.For areas affected by wildfires that require electrical distribution infrastructure to be rebuilt by an electrical corporation, the electrical corporation shall consider the undergrounding of electrical distribution infrastructure if it is determined to be cost effective compared to other wildfire mitigation strategies.
SEC. 5.SEC. 6.Chapter 8 (commencing with Section 8395) is added to Division 4.1 of the Public Utilities Code, to read:8.Regional Emergency Operations8395.(a)All electrical corporations and local publicly owned electric utilities that have a service area that overlaps with the boundaries of a state regional emergency operations center, in cooperation with the Office of Emergency Services and other emergency service agencies, shall establish procedures for the coordination of efforts between electrical corporations and local publicly owned electric utilities and their representatives and those of emergency response agencies.
(b)All electrical corporations and local publicly owned electric utilities subject to subdivision (a) shall assign a representative to work within each state regional operations center that has boundaries that overlap with the electrical corporations or local publicly owned electric utilitys service area. area when requested by the state regional operations center. The representative shall complete the appropriate annual emergency management training, sufficient to enable them to perform their assigned role, that is provided under the Standardized Emergency Management System training. framework, to the fullest extent possible.
SEC. 6.SEC. 7.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)On or before January 1, 2027, the commission shall update General Order No.95, as revised on December 19, 2024, by commission Resolution ESRB-12, to require each electrical corporation to remove all permanently abandoned facilities in order to prevent public nuisances or hazards to life or property.
(b)The commission shall ensure all applicable safety requirements, including wildfire mitigation measures, apply to permanently abandoned facilities until they are removed.
(c)This section does not, and the update required pursuant to subdivision (a) shall not, impact an electrical corporations right to an easement.
(d)For purposes of this section, permanently abandoned facility means a facility that is out of service and the owner cannot demonstrate, with appropriate documentation, an intent to place the facility, or portions of the facility, into service within three years.
SECTION 1.SEC. 2.Section 8386 of the Public Utilities Code is amended to read:8386.(a)Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.
(b)Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division for review and approval. In calendar year 2020, and thereafter, the plan shall cover at least a three-year period. The division shall establish a schedule for the submission of subsequent comprehensive wildfire mitigation plans, which may allow for the staggering of compliance periods for each electrical corporation. In its discretion, the division may allow the annual submissions to be updates to the last approved comprehensive wildfire mitigation plan; provided, that each electrical corporation shall submit a comprehensive wildfire mitigation plan at least once every three years.
(c)The wildfire mitigation plan shall include all of the following:
(1)An accounting of the responsibilities of persons responsible for executing the plan.
(2)The objectives of the plan.
(3)A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of areas adjacent to high fire threat areas and dynamic climate change risks.
(4)A description of the metrics the electrical corporation plans to use to evaluate the plans performance and the assumptions that underlie the use of those metrics.
(5)A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.
(6)A description of the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of these protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on all of the following:
(A)Critical first responders.
(B)Health and communication infrastructure.
(C)Customers who receive medical baseline allowances pursuant to subdivision (c) of Section 739. The electrical corporation may deploy backup electrical resources or provide financial assistance for backup electrical resources to a customer receiving a medical baseline allowance for a customer who meets all of the following requirements:
(i)The customer relies on life-support equipment that operates on electricity to sustain life.
(ii)The customer demonstrates financial need, including through enrollment in the California Alternate Rates for Energy program continued pursuant to Section 739.1.
(iii)The customer is not eligible for backup electrical resources provided through medical services, medical insurance, or community resources.
(D)Subparagraph (C) shall not be construed as preventing an electrical corporation from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.
(E)The opportunity for residents within a household who are not the customer of record to subscribe to receive notifications related to deenergization events.
(F)Communication with public safety partners who have the ability to coordinate with the electrical corporation to provide broader messaging to affected communities.
(7)A description of the electrical corporations appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including procedures for those customers receiving medical baseline allowances as described in paragraph (6). The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event. The procedures shall comply with any orders of the commission regarding notifications of deenergization events.
(8)Identification of circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits, including, but not limited to, the estimated annual decline in circuit deenergization and deenergization impact on customers, and replacing, hardening, or undergrounding any portion of the circuit or of upstream transmission or distribution lines.
(9)Plans for vegetation management.
(10)Plans for inspections of the electrical corporations electrical infrastructure.
(11)A description of the electrical corporations protocols for the deenergization of the electrical corporations transmission infrastructure, for instances when the deenergization may impact customers who, or entities that, are dependent upon the infrastructure. The protocols shall comply with any order of the commission regarding deenergization events.
(12)A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporations service territory, including all relevant wildfire risk and risk mitigation information that is part of the commissions Safety Model Assessment Proceeding (A.15-05-002, et al.) and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:
(A)Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporations equipment and facilities.
(B)Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporations service territory.
(13)A description of how the plan accounts for the wildfire risk identified in the electrical corporations Risk Assessment Mitigation Phase filing.
(14)A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulating of distribution wires, and replacing poles.
(15)A description of where and how the electrical corporation considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a commission fire threat map.
(16)A showing that the electrical corporation has an adequately sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the electrical corporation.
(17)Identification of any geographic area in the electrical corporations service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.
(18)A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.
(19)A description of how the plan is consistent with the electrical corporations disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:
(A)Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.
(B)Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.
(20)A statement of how the electrical corporation will restore service after a wildfire.
(21)Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to electrical corporation representatives, and emergency communications.
(22)A description of the processes and procedures the electrical corporation will use to do all of the following:
(A)Monitor and audit the implementation of the plan.
(B)Identify any deficiencies in the plan or the plans implementation and correct those deficiencies.
(C)Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.
(23)Any other information that the Wildfire Safety Division may require.
(24)(A)Identification of any lapses in communication coordination during recent past emergency response events with local governments within the service area of the electrical corporation.
(B)A description of any opportunities to collaborate with local governments, including county fire officials, and other steps that can be taken to establish more efficient communication coordination during future emergency responses.
(25)For areas affected by wildfires that require electrical distribution infrastructure to be rebuilt by an electrical corporation, consideration of undergrounding distribution infrastructure if it is determined to be cost effective compared to other wildfire mitigation strategies.
(26)(A)An accounting of all transmission facilities, including a list of facilities that are in service, facilities that are out of service, and permanently abandoned facilities that are transmission facilities. For permanently abandoned facilities that are transmission facilities, the accounting shall include a plan for how and when each facility will be removed and the wildfire mitigation measures that are being implemented to prevent hazards, including, but not limited to, induction.
(B)For purposes of this paragraph, permanently abandoned facilities has the same meaning as defined in Section 762.8.
(d)The Wildfire Safety Division shall post all wildfire mitigation plans and annual updates on the commissions internet website before July 1, 2021, and on the offices internet website beginning July 1, 2021, for no less than two months before the divisions or offices decision regarding approval of the plan. The division or office shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.
(e)(1)The electrical corporation shall conduct an annual wildfire preparedness workshop in collaboration with and open to any local fire department in its service area to provide updates on the latest adopted wildfire mitigation plan required by this section, discuss any lapses in, and opportunities to increase efficiency of, communication coordination during emergency responses pursuant to paragraph (24) of subdivision (c), and gather input for inclusion in the development of the next annual submission of the wildfire mitigation plan required pursuant to subdivision (b).
(2)The electrical corporation shall incorporate relevant information obtained from the workshop required pursuant to paragraph (1) into the emergency and disaster preparedness plan required pursuant to Section 768.6.
SEC. 2.SEC. 3.Section 8386.9 is added to the Public Utilities Code, to read:8386.9.The commission shall not allow a large electrical corporation to include in its equity rate base its share, as determined pursuant to the Wildfire Fund allocation metric specified in Section 3280, of the amount specified by subdivision (e) of Section 8386.3 that the large electrical corporations collectively first expend on fire risk mitigation capital expenditures approved by the commission on or after January 1, 2025.
SEC. 3.SEC. 4.Section 8387 of the Public Utilities Code is amended to read:8387.(a)Each local publicly owned electric utility and electrical cooperative shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of wildfire posed by those electrical lines and equipment.
(b)(1)The local publicly owned electric utility or electrical cooperative shall, before January 1, 2020, prepare a wildfire mitigation plan. After January 1, 2020, a local publicly owned electric utility or electrical cooperative shall prepare a wildfire mitigation plan annually and shall submit the plan to the California Wildfire Safety Advisory Board on or before July 1 of that calendar year. Each local publicly owned electric utility and electrical cooperative shall update its plan annually and submit the update to the California Wildfire Safety Advisory Board by July 1 of each year. At least once every three years, the submission shall be a comprehensive revision of the plan.
(2)The wildfire mitigation plan shall consider as necessary, at minimum, all of the following:
(A)An accounting of the responsibilities of persons responsible for executing the plan.
(B)The objectives of the wildfire mitigation plan.
(C)A description of the preventive strategies and programs to be adopted by the local publicly owned electric utility or electrical cooperative to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of areas adjacent to high fire threat areas and dynamic climate change risks. risks and risks related to the wildland-urban interface.
(D)A description of the metrics the local publicly owned electric utility or electrical cooperative plans to use to evaluate the wildfire mitigation plans performance and the assumptions that underlie the use of those metrics.
(E)A discussion of how the application of previously identified metrics to previous wildfire mitigation plan performances has informed the wildfire mitigation plan.
(F)Protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, as well as protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communication infrastructure.
(G)Appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines. The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event.
(H)Plans for vegetation management.
(I)Plans for inspections of the local publicly owned electric utilitys or electrical cooperatives electrical infrastructure.
(J)A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the local publicly owned electric utilitys or electrical cooperatives service territory. The list shall include, but not be limited to, both of the following:
(i)Risks and risk drivers associated with design, construction, operation, and maintenance of the local publicly owned electric utilitys or electrical cooperatives equipment and facilities.
(ii)Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the local publicly owned electric utilitys or electrical cooperatives service territory.
(K)Identification of any geographic area in the local publicly owned electric utilitys or electrical cooperatives service territory that is a higher wildfire threat than is identified in a commission fire threat map, and identification of where the commission should expand a high fire-threat district based on new information or changes to the environment.
(L)A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk.
(M)A statement of how the local publicly owned electric utility or electrical cooperative will restore service after a wildfire.
(N)A description of the processes and procedures the local publicly owned electric utility or electrical cooperative shall use to do all of the following:
(i)Monitor and audit the implementation of the wildfire mitigation plan.
(ii)Identify any deficiencies in the wildfire mitigation plan or its implementation, and correct those deficiencies.
(iii)Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, that are carried out under the plan, other applicable statutes, or commission rules.
(O)(i)Identification of any lapses in communication coordination during recent past emergency response events with local governments within the service area of the local publicly owned electric utility or electrical cooperative.(ii)A description of any opportunities to collaborate with local governments, including county fire officials, and other steps that can be taken to establish more efficient communication coordination during future emergency responses.(O)A description of the processes and procedures by which the local publicly owned electric utility or electrical cooperative coordinates communication with local governments within the service area of the local publicly owned electric utility or electrical cooperative, including fire officials and emergency response officials, as part of the preparation of the wildfire mitigation plan and during a wildfire-related emergency.
(3)The local publicly owned electric utility or electrical cooperative shall, on or before January 1, 2020, and not less than annually thereafter, present its wildfire mitigation plan in an appropriately noticed public meeting. The local publicly owned electric utility or electrical cooperative shall accept comments on its wildfire mitigation plan from the public, other local and state agencies, and interested parties, and shall verify that the wildfire mitigation plan complies with all applicable rules, regulations, and standards, as appropriate.
(c)The local publicly owned electric utility or electrical cooperative shall contract with a qualified independent evaluator with experience in assessing the safe operation of electrical infrastructure to review and assess the comprehensiveness of its wildfire mitigation plan. The independent evaluator shall issue a report that shall be made available on the internet website of the local publicly owned electric utility or electrical cooperative, and shall present the report at a public meeting of the local publicly owned electric utilitys or electrical cooperatives governing board.
(d)The local publicly owned electric utility or electrical cooperative shall conduct an annual wildfire preparedness workshop in collaboration with and open to any local fire department in its service area to provide updates on the latest adopted wildfire mitigation plan required by this section, discuss any lapses in, and opportunities to increase efficiency of, communication coordination during emergency responses pursuant to subparagraph (O) of paragraph (2) of subdivision (b), and gather input for inclusion in the development of the next annual submission of the wildfire mitigation plan required pursuant to paragraph (1) of subdivision (b).SEC. 4.SEC. 5.Chapter 8 (commencing with Section 8395) is added to Division 4.1 of the Public Utilities Code, to read:8.Regional Emergency Operations8395.(a)All electrical corporations and local publicly owned electric utilities that have a service area that overlaps with the boundaries of a state regional emergency operations center, in cooperation with the Office of Emergency Services and other emergency service agencies, shall establish procedures for the coordination of efforts between electrical corporations and local publicly owned electric utilities and their representatives and those of emergency response agencies.
(b)All electrical corporations and local publicly owned electric utilities subject to subdivision (a) shall assign a representative to work within each state regional operations center that has boundaries that overlap with the electrical corporations or local publicly owned electric utilitys service area. The representative shall complete the appropriate Standardized Emergency Management System training.
SEC. 5.SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.
(b)Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division for review and approval. In calendar year 2020, and thereafter, the plan shall cover at least a three-year period. The division shall establish a schedule for the submission of subsequent comprehensive wildfire mitigation plans, which may allow for the staggering of compliance periods for each electrical corporation. In its discretion, the division may allow the annual submissions to be updates to the last approved comprehensive wildfire mitigation plan; provided, that each electrical corporation shall submit a comprehensive wildfire mitigation plan at least once every three years.
(c)The wildfire mitigation plan shall include all of the following:
(1)An accounting of the responsibilities of persons responsible for executing the plan.
(2)The objectives of the plan.
(3)A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of low-risk areas adjacent to high fire threat areas and dynamic climate change risks.
(4)A description of the metrics the electrical corporation plans to use to evaluate the plans performance and the assumptions that underlie the use of those metrics.
(5)A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.
(6)A description of the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of these protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on all of the following:
(A)Critical first responders.
(B)Health and communication infrastructure.
(C)Customers who receive medical baseline allowances pursuant to subdivision (c) of Section 739. The electrical corporation may deploy backup electrical resources or provide financial assistance for backup electrical resources to a customer receiving a medical baseline allowance for a customer who meets all of the following requirements:
(i)The customer relies on life-support equipment that operates on electricity to sustain life.
(ii)The customer demonstrates financial need, including through enrollment in the California Alternate Rates for Energy program continued pursuant to Section 739.1.
(iii)The customer is not eligible for backup electrical resources provided through medical services, medical insurance, or community resources.
(D)Subparagraph (C) shall not be construed as preventing an electrical corporation from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.
(E)The opportunity for residents within a household who are not the customer of record to subscribe to receive notifications related to deenergization events.
(F)Communication with public safety partners who have the ability to coordinate with the electrical corporation to provide broader messaging to affected communities.
(7)A description of the electrical corporations appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including procedures for those customers receiving medical baseline allowances as described in paragraph (6). The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event. The procedures shall comply with any orders of the commission regarding notifications of deenergization events.
(8)Identification of circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits, including, but not limited to, the estimated annual decline in circuit deenergization and deenergization impact on customers, and replacing, hardening, or undergrounding any portion of the circuit or of upstream transmission or distribution lines.
(9)Plans for vegetation management.
(10)Plans for inspections of the electrical corporations electrical infrastructure.
(11)A description of the electrical corporations protocols for the deenergization of the electrical corporations transmission infrastructure, for instances when the deenergization may impact customers who, or entities that, are dependent upon the infrastructure. The protocols shall comply with any order of the commission regarding deenergization events.
(12)A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporations service territory, including all relevant wildfire risk and risk mitigation information that is part of the commissions Safety Model Assessment Proceeding (A.15-05-002, et al.) and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:
(A)Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporations equipment and facilities.
(B)Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporations service territory.
(13)A description of how the plan accounts for the wildfire risk identified in the electrical corporations Risk Assessment Mitigation Phase filing.
(14)A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulating of distribution wires, and replacing poles.
(15)A description of where and how the electrical corporation considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a commission fire threat map.
(16)A showing that the electrical corporation has an adequately sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the electrical corporation.
(17)Identification of any geographic area in the electrical corporations service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.
(18)A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.
(19)A description of how the plan is consistent with the electrical corporations disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:
(A)Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.
(B)Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.
(20)A statement of how the electrical corporation will restore service after a wildfire.
(21)Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to electrical corporation representatives, and emergency communications.
(22)A description of the processes and procedures the electrical corporation will use to do all of the following:
(A)Monitor and audit the implementation of the plan.
(B)Identify any deficiencies in the plan or the plans implementation and correct those deficiencies.
(C)Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.
(23)Any other information that the Wildfire Safety Division may require.
(24)(A)Identification of any lapses in communication coordination during recent past emergency response events with local governments within the service area of the electrical corporation.
(B)A description of any opportunities to collaborate with local governments, including county fire officials, and other steps that can be taken to establish more efficient communication coordination during future emergency responses.
(25)For areas affected by wildfires that require electrical distribution infrastructure to be rebuilt by an electrical corporation, consideration of undergrounding distribution infrastructure if it is determined to be cost effective compared to other wildfire mitigation strategies.
(d)The Wildfire Safety Division shall post all wildfire mitigation plans and annual updates on the commissions internet website before July 1, 2021, and on the offices internet website beginning July 1, 2021, for no less than two months before the divisions or offices decision regarding approval of the plan. The division or office shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.
(e)(1)The electrical corporation shall conduct an annual wildfire preparedness workshop in collaboration with and open to any local fire department in its service area to provide updates on the latest adopted wildfire mitigation plan required by this section, discuss any lapses in, and opportunities to increase efficiency of, communication coordination during emergency responses pursuant paragraph (24) of subdivision (c), and gather input for inclusion in the development of the next annual submission of the wildfire mitigation plan required pursuant to subdivision (b).
(2)The electrical corporation shall incorporate relevant information obtained from the workshop required pursuant to paragraph (1) into the emergency and disaster preparedness plan required pursuant to Section 768.6.
SEC. 2.Section 8386.9 is added to the Public Utilities Code, to read:8386.9.The commission shall not allow a large electrical corporation to include in its equity rate base its share, as determined pursuant to the Wildfire Fund allocation metric specified in Section 3280, of the amount specified by subdivision (e) of Section 8386.3 that the large electrical corporations collectively first expend on fire risk mitigation capital expenditures approved by the commission on or after January 1, 2025.
SEC. 3.Section 8387 of the Public Utilities Code is amended to read:8387.(a)Each local publicly owned electric utility and electrical cooperative shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of wildfire posed by those electrical lines and equipment.
(b)(1)The local publicly owned electric utility or electrical cooperative shall, before January 1, 2020, prepare a wildfire mitigation plan. After January 1, 2020, a local publicly owned electric utility or electrical cooperative shall prepare a wildfire mitigation plan annually and shall submit the plan to the California Wildfire Safety Advisory Board on or before July 1 of that calendar year. Each local publicly owned electric utility and electrical cooperative shall update its plan annually and submit the update to the California Wildfire Safety Advisory Board by July 1 of each year. At least once every three years, the submission shall be a comprehensive revision of the plan.
(2)The wildfire mitigation plan shall consider as necessary, at minimum, all of the following:
(A)An accounting of the responsibilities of persons responsible for executing the plan.
(B)The objectives of the wildfire mitigation plan.
(C)A description of the preventive strategies and programs to be adopted by the local publicly owned electric utility or electrical cooperative to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of low-risk areas adjacent to high fire threat areas and dynamic climate change risks.
(D)A description of the metrics the local publicly owned electric utility or electrical cooperative plans to use to evaluate the wildfire mitigation plans performance and the assumptions that underlie the use of those metrics.
(E)A discussion of how the application of previously identified metrics to previous wildfire mitigation plan performances has informed the wildfire mitigation plan.
(F)Protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, as well as protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communication infrastructure.
(G)Appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines. The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event.
(H)Plans for vegetation management.
(I)Plans for inspections of the local publicly owned electric utilitys or electrical cooperatives electrical infrastructure.
(J)A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the local publicly owned electric utilitys or electrical cooperatives service territory. The list shall include, but not be limited to, both of the following:
(i)Risks and risk drivers associated with design, construction, operation, and maintenance of the local publicly owned electric utilitys or electrical cooperatives equipment and facilities.
(ii)Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the local publicly owned electric utilitys or electrical cooperatives service territory.
(K)Identification of any geographic area in the local publicly owned electric utilitys or electrical cooperatives service territory that is a higher wildfire threat than is identified in a commission fire threat map, and identification of where the commission should expand a high fire-threat district based on new information or changes to the environment.
(L)A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk.
(M)A statement of how the local publicly owned electric utility or electrical cooperative will restore service after a wildfire.
(N)A description of the processes and procedures the local publicly owned electric utility or electrical cooperative shall use to do all of the following:
(i)Monitor and audit the implementation of the wildfire mitigation plan.
(ii)Identify any deficiencies in the wildfire mitigation plan or its implementation, and correct those deficiencies.
(iii)Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, that are carried out under the plan, other applicable statutes, or commission rules.
(O)(i)Identification of any lapses in communication coordination during recent past emergency response events with local governments within the service area of the local publicly owned electric utility or electrical cooperative.
(ii)A description of any opportunities to collaborate with local governments, including county fire officials, and other steps that can be taken to establish more efficient communication coordination during future emergency responses.
(3)The local publicly owned electric utility or electrical cooperative shall, on or before January 1, 2020, and not less than annually thereafter, present its wildfire mitigation plan in an appropriately noticed public meeting. The local publicly owned electric utility or electrical cooperative shall accept comments on its wildfire mitigation plan from the public, other local and state agencies, and interested parties, and shall verify that the wildfire mitigation plan complies with all applicable rules, regulations, and standards, as appropriate.
(c)The local publicly owned electric utility or electrical cooperative shall contract with a qualified independent evaluator with experience in assessing the safe operation of electrical infrastructure to review and assess the comprehensiveness of its wildfire mitigation plan. The independent evaluator shall issue a report that shall be made available on the internet website of the local publicly owned electric utility or electrical cooperative, and shall present the report at a public meeting of the local publicly owned electric utilitys or electrical cooperatives governing board.
(d)The local publicly owned electric utility or electrical cooperative shall conduct an annual wildfire preparedness workshop in collaboration with and open to any local fire department in its service area to provide updates on the latest adopted wildfire mitigation plan required by this section, discuss any lapses in, and opportunities to increase efficiency of, communication coordination during emergency responses pursuant to subparagraph (O) of paragraph (2) of subdivision (b), and gather input for inclusion in the development of the next annual submission of the wildfire mitigation plan required pursuant to paragraph (1) of subdivision (b).
SEC. 4.Section 8388.5 of the Public Utilities Code is amended to read:8388.5.(a)The commission shall establish an expedited utility distribution infrastructure undergrounding program consistent with this section.(b)Only a large electrical corporation may participate in the program.(c)In order to participate in the program, a large electrical corporation shall submit to the office a distribution infrastructure undergrounding plan that shall address or include, at minimum, all of the following components:(1)A 10-year plan for undergrounding distribution infrastructure.(2)Identification of the undergrounding projects that will be constructed as part of the program, including a means of prioritizing undergrounding projects based on wildfire risk reduction, public safety, cost efficiency, and reliability benefits. Only undergrounding projects located in tier 2 or 3 high fire-threat districts or rebuild areas may be considered and constructed as part of the program.(3)Timelines for the completion of identified and prioritized undergrounding projects, and unit cost targets and mileage completion targets for each year covered by the plan.(4)A comparison of undergrounding versus aboveground hardening of electrical infrastructure and wildfire mitigation for achieving comparable risk reduction, or any other alternative mitigation strategy, such as covered conductor and rapid earth fault current limiter devices, for those prioritized undergrounding projects, evaluating the scope, cost, extent, and risk reduction of each activity, separately and collectively, over the duration of the plan. The comparison shall emphasize risk reduction and include an analysis of the cost of each activity for reducing wildfire risk, separately and collectively, over the duration of the plan.(5)A plan for utility and contractor workforce development.(6)An evaluation of project costs, projected economic benefits over the life of the assets, and any cost containment assumptions, including the economies of scale necessary to reduce wildfire risk and mitigation costs and establish a sustainable supply chain.(d)Upon a large electrical corporation submitting a plan to the office, the office shall do both of the following:(1)Publish the plan for public comment.(2)Within nine months, review and approve or deny the plan. The office may only approve the plan if the large electrical corporation has shown that the plan will substantially increase electrical reliability by reducing the use of public safety power shutoffs, enhanced powerline safety settings, deenergization events, and any other outage programs, and substantially reduce the risk of wildfire. Before approving the plan, the office may require the large electrical corporation to modify the plan.(e)(1)Upon the office approving a plan pursuant to paragraph (2) of subdivision (d), the large electrical corporation shall, within 60 days, submit to the commission a copy of the plan and an application requesting review and conditional approval of the plans costs and including all of the following:(A)Any substantial improvements in safety risk and reduction in costs compared to other hardening and risk mitigation measures over the duration of the plan.(B)The cost targets, at a minimum, that result in feasible and attainable cost reductions as compared to the large electrical corporations historical undergrounding costs.(C)How the cost targets are expected to decline over time due to cost efficiencies and economies of scale.(D)A strategy for achieving cost reductions over time.(2)The assigned commissioner may waive the requirements of subdivisions (b), (d), (f), and (i) of Section 1701.3 for an application submitted to the commission pursuant to paragraph (1).(3)In reviewing an application submitted to the commission pursuant to paragraph (1), the commission shall consider not revisiting cost or mileage completion targets approved, or pending approval, in the electrical corporations general rate case or a commission-approved balancing account ratemaking mechanism for system hardening.(4)Upon the commission receiving an application pursuant to paragraph (1), the commission shall facilitate a public workshop for presentation of the plan and take public comment for at least 30 days.(5)On or before nine months, the commission shall review and approve or deny the application. Before approving the application, the commission may require the large electrical corporation to modify or modify and resubmit the application.(6)The commission shall consider continuing an existing commission-approved balancing account ratemaking mechanism for system hardening for the duration of a plan, as determined by the commission, and shall authorize recovery of recorded costs that are determined to be just and reasonable.(f)If the plan is approved by the office and commission, the large electrical corporation shall do all of the following:(1)Every six months, file a progress report with the office and the commission. The large electrical corporation and the office shall publish these progress reports on their internet websites.(2)Include ongoing work plans and progress in annual wildfire mitigation plan filings.(3)Hire an independent monitor, selected by the office, to review and assess the large electrical corporations compliance with its plan and submit a report with the office each December 1 over the course of the plan.(g)(1)In reviewing and assessing the large electrical corporations compliance with its plan pursuant to paragraph (3) of subdivision (f), the independent monitor shall assess whether the large electrical corporations progress on undergrounding work has been consistent with the objectives identified in its plan. The independent monitors report shall specify any failure, delays, or shortcomings of the large electrical corporation and provide recommendations for improvements to accomplish the objectives set forth in the plan.(2)The large electrical corporation shall have 180 days to correct and eliminate any deficiency specified in the independent monitors report.(3)On or before December 1 of each year the plan is in effect, the independent monitor shall submit the report to the office.(h)The office shall publish reports received pursuant to paragraph (3) of subdivision (g) on its internet website.(i)(1)The office shall consider the independent monitors report and whether the large electrical corporation has cured any deficiencies, and may recommend penalties to the commission.(2)The commission may assess penalties on a large electrical corporation that fails to substantially comply with a commission decision approving its plan.(j)Each large electrical corporation participating in the program shall apply for available federal, state, and other nonratepayer moneys throughout the duration of its approved undergrounding plan, and any moneys received as a result of those applications shall be used to reduce the programs costs on the large electrical corporations ratepayers.(k)(1)Notwithstanding subdivision (b), the commission shall require all electrical corporations to participate in the program created by this section and consistent with both of the following:(A)The commission shall require that the distribution infrastructure undergrounding plan do both of the following:(i)Include a thorough risk assessment, prioritize high fire risk areas, and provide detailed project timelines.(ii)Include cost estimates, funding strategies, and establish a framework for community engagement and transparency throughout the process.(B)For areas where undergrounding is not feasible, the commission shall require the distribution infrastructure undergrounding plan to include a detailed explanation of why undergrounding is not feasible and propose alternative solutions to mitigate risks associated with utility equipment, including, but not limited to, replacing overhead infrastructure with covered conductors or other equipment modernization actions that reduce the potential for fire hazards.(2)The commission shall coordinate with the Office of Energy Infrastructure Safety to make participation in the program created by this section a requirement for obtaining the safety certificate issued pursuant to subdivision (e) of Section 8389.(3)The commission shall adopt a decision on the financing of infrastructure projects conducted pursuant to the program created by this section that implements a revised return on equity structure for electrical corporations that caps the maximum allowable return on capital investment at a set percentage for undergrounding and that may include either of the following:(A)Securitization for specific projects that replaces high-return on equity financing with a lower cost option.(B)Public-private partnerships or public ownership models.(4)The commission shall ensure that the decision adopted pursuant to paragraph (3) leads to reduced long-term expenses for customers.SEC. 5.SEC. 4.Chapter 8 (commencing with Section 8395) is added to Division 4.1 of the Public Utilities Code, to read:8.Regional Emergency Operations8395.(a)All electrical corporations and local publicly owned electric utilities that have a service area that overlaps with the boundaries of a state regional emergency operations center, in cooperation with the Office of Emergency Services, Services and other emergency service agencies, shall establish procedures for the coordination of efforts between electrical corporations and local publicly owned electric utilities and their representatives and those of emergency response agencies.
(b)All electrical corporations and local publicly owned electric utilities subject to subdivision (a) shall assign a representative to work within each state regional operations center that has boundaries that overlap with the electrical corporations or local publicly owned electric utilitys service area. The representative shall complete the appropriate Standardized Emergency Management System training.
SEC. 6.SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The commission shall update the guidelines adopted in Decision 21-06-034 (June 24, 2021), Decision Adopting Phase 3 Revised and Additional Guidelines and Rules for Public Safety Power Shutoffs (Proactive De-Energizations) of Electric Facilities to Mitigate Wildfire Risk Caused by Utility Infrastructure, or as subsequently adopted, to require each electrical corporation and local publicly owned electric utility to establish a means for notifying customers and noncustomers located in an area subject to a public safety power shutoff.
(b)The means established for notifying customers and noncustomers located in an area subject to a public safety power shutoff pursuant to subdivision (a) shall do both of the following:
(1)Be designed to be an alert that allows customers or noncustomers to opt out of receiving future alerts.
(2)Be accomplished in partnership with the Office of Emergency Services through the use of the Emergency Alert System and through an update to the State of California Alert and Warning Guidelines that includes, but is not limited to, all of the following:
(A)A procedure that notifies customers and noncustomers of the expected or estimated time of service restoration, or, if there is no estimated time of service restoration, that there is no current estimate of time of service restoration.
(B)A procedure for providing a daily update of the information contained in subparagraph (A) to customers and noncustomers during the duration of a public safety power shutoff.
(C)A description in the notification of the geographic areas affected by the public safety power shutoff.
(c)The commission shall incorporate the updates that the Office of Emergency Services makes to the State of California Alert and Warning Guidelines pursuant to paragraph (2) of subdivision (b) into the update to the guidelines required pursuant to subdivision (a) as necessary to align the guidelines for the operation of the notification required by this section.
SEC. 2.Section 8386 of the Public Utilities Code is amended to read:8386.(a)Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.
(b)Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the Wildfire Safety Division for review and approval. In calendar year 2020, and thereafter, the plan shall cover at least a three-year period. The division shall establish a schedule for the submission of subsequent comprehensive wildfire mitigation plans, which may allow for the staggering of compliance periods for each electrical corporation. In its discretion, the division may allow the annual submissions to be updates to the last approved comprehensive wildfire mitigation plan; provided, that each electrical corporation shall submit a comprehensive wildfire mitigation plan at least once every three years.
(c)The wildfire mitigation plan shall include all of the following:
(1)An accounting of the responsibilities of persons responsible for executing the plan.
(2)The objectives of the plan.
(3)A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of low-risk areas and dynamic climate change risks.
(4)A description of the metrics the electrical corporation plans to use to evaluate the plans performance and the assumptions that underlie the use of those metrics.
(5)A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.
(6)A description of the electrical corporations protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of these protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on all of the following:
(A)Critical first responders.
(B)Health and communication infrastructure.
(C)Customers who receive medical baseline allowances pursuant to subdivision (c) of Section 739. The electrical corporation may deploy backup electrical resources or provide financial assistance for backup electrical resources to a customer receiving a medical baseline allowance for a customer who meets all of the following requirements:
(i)The customer relies on life-support equipment that operates on electricity to sustain life.
(ii)The customer demonstrates financial need, including through enrollment in the California Alternate Rates for Energy program continued pursuant to Section 739.1.
(iii)The customer is not eligible for backup electrical resources provided through medical services, medical insurance, or community resources.
(D)Subparagraph (C) shall not be construed as preventing an electrical corporation from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.
(7)A description of the electrical corporations appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including procedures for those customers receiving medical baseline allowances as described in paragraph (6). The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event. The procedures shall comply with any orders of the commission regarding notifications of deenergization events.
(8)Identification of circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits, including, but not limited to, the estimated annual decline in circuit deenergization and deenergization impact on customers, and replacing, hardening, or undergrounding any portion of the circuit or of upstream transmission or distribution lines.
(9)Plans for vegetation management.
(10)Plans for inspections of the electrical corporations electrical infrastructure.
(11)A description of the electrical corporations protocols for the deenergization of the electrical corporations transmission infrastructure, for instances when the deenergization may impact customers who, or entities that, are dependent upon the infrastructure. The protocols shall comply with any order of the commission regarding deenergization events.
(12)A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporations service territory, including all relevant wildfire risk and risk mitigation information that is part of the commissions Safety Model Assessment Proceeding (A.15-05-002, et al.) and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:
(A)Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporations equipment and facilities.
(B)Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporations service territory.
(13)A description of how the plan accounts for the wildfire risk identified in the electrical corporations Risk Assessment Mitigation Phase filing.
(14)A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulating of distribution wires, and replacing poles.
(15)A description of where and how the electrical corporation considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a commission fire threat map.
(16)A showing that the electrical corporation has an adequately sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the electrical corporation.
(17)Identification of any geographic area in the electrical corporations service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.
(18)A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.
(19)A description of how the plan is consistent with the electrical corporations disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:
(A)Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.
(B)Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.
(20)A statement of how the electrical corporation will restore service after a wildfire.
(21)Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to electrical corporation representatives, and emergency communications.
(22)A description of the processes and procedures the electrical corporation will use to do all of the following:
(A)Monitor and audit the implementation of the plan.
(B)Identify any deficiencies in the plan or the plans implementation and correct those deficiencies.
(C)Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.
(23)Any other information that the Wildfire Safety Division may require.
(24)(A)Identification of any lapses in communication coordination during recent past emergency response events with local governments within the service area of the electrical corporation.
(B)A description of any opportunities to collaborate with local governments, including county fire officials, and other steps that can be taken to establish more efficient communication coordination during future emergency responses.
(d)The Wildfire Safety Division shall post all wildfire mitigation plans and annual updates on the commissions internet website before July 1, 2021, and on the offices internet website beginning July 1, 2021, for no less than two months before the divisions or offices decision regarding approval of the plan. The division or office shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.
(e)(1)The electrical corporation shall conduct an annual wildfire preparedness workshop in collaboration with and open to any local fire department in its service area to provide updates on the latest adopted wildfire mitigation plan required by this section, discuss any lapses in, and opportunities to increase efficiency of, communication coordination during emergency responses pursuant paragraph (24) of subdivision (c), and gather input for inclusion in the development of the next annual submission of the wildfire mitigation plan required pursuant to subdivision (b).
(2)The electrical corporation shall incorporate relevant information obtained from the workshop required pursuant to paragraph (1) into the emergency and disaster preparedness plan required pursuant to Section 768.6.
SEC. 3.Section 8387 of the Public Utilities Code is amended to read:8387.(a)Each local publicly owned electric utility and electrical cooperative shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of wildfire posed by those electrical lines and equipment.
(b)(1)The local publicly owned electric utility or electrical cooperative shall, before January 1, 2020, prepare a wildfire mitigation plan. After January 1, 2020, a local publicly owned electric utility or electrical cooperative shall prepare a wildfire mitigation plan annually and shall submit the plan to the California Wildfire Safety Advisory Board on or before July 1 of that calendar year. Each local publicly owned electric utility and electrical cooperative shall update its plan annually and submit the update to the California Wildfire Safety Advisory Board by July 1 of each year. At least once every three years, the submission shall be a comprehensive revision of the plan.
(2)The wildfire mitigation plan shall consider as necessary, at minimum, all of the following:
(A)An accounting of the responsibilities of persons responsible for executing the plan.
(B)The objectives of the wildfire mitigation plan.
(C)A description of the preventive strategies and programs to be adopted by the local publicly owned electric utility or electrical cooperative to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of low-risk areas and dynamic climate change risks.
(D)A description of the metrics the local publicly owned electric utility or electrical cooperative plans to use to evaluate the wildfire mitigation plans performance and the assumptions that underlie the use of those metrics.
(E)A discussion of how the application of previously identified metrics to previous wildfire mitigation plan performances has informed the wildfire mitigation plan.
(F)Protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, as well as protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communication infrastructure.
(G)Appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines. The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential deenergization for a given event.
(H)Plans for vegetation management.
(I)Plans for inspections of the local publicly owned electric utilitys or electrical cooperatives electrical infrastructure.
(J)A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the local publicly owned electric utilitys or electrical cooperatives service territory. The list shall include, but not be limited to, both of the following:
(i)Risks and risk drivers associated with design, construction, operation, and maintenance of the local publicly owned electric utilitys or electrical cooperatives equipment and facilities.
(ii)Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the local publicly owned electric utilitys or electrical cooperatives service territory.
(K)Identification of any geographic area in the local publicly owned electric utilitys or electrical cooperatives service territory that is a higher wildfire threat than is identified in a commission fire threat map, and identification of where the commission should expand a high fire-threat district based on new information or changes to the environment.
(L)A methodology for identifying and presenting enterprisewide safety risk and wildfire-related risk.
(M)A statement of how the local publicly owned electric utility or electrical cooperative will restore service after a wildfire.
(N)A description of the processes and procedures the local publicly owned electric utility or electrical cooperative shall use to do all of the following:
(i)Monitor and audit the implementation of the wildfire mitigation plan.
(ii)Identify any deficiencies in the wildfire mitigation plan or its implementation, and correct those deficiencies.
(iii)Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, that are carried out under the plan, other applicable statutes, or commission rules.
(O)(i)Identification of any lapses in communication coordination during recent past emergency response events with local governments within the service area of the local publicly owned electric utility or electrical cooperative.
(ii)A description of any opportunities to collaborate with local governments, including county fire officials, and other steps that can be taken to establish more efficient communication coordination during future emergency responses.
(3)The local publicly owned electric utility or electrical cooperative shall, on or before January 1, 2020, and not less than annually thereafter, present its wildfire mitigation plan in an appropriately noticed public meeting. The local publicly owned electric utility or electrical cooperative shall accept comments on its wildfire mitigation plan from the public, other local and state agencies, and interested parties, and shall verify that the wildfire mitigation plan complies with all applicable rules, regulations, and standards, as appropriate.
(c)The local publicly owned electric utility or electrical cooperative shall contract with a qualified independent evaluator with experience in assessing the safe operation of electrical infrastructure to review and assess the comprehensiveness of its wildfire mitigation plan. The independent evaluator shall issue a report that shall be made available on the internet website of the local publicly owned electric utility or electrical cooperative, and shall present the report at a public meeting of the local publicly owned electric utilitys or electrical cooperatives governing board.
(d)The local publicly owned electric utility or electrical cooperative shall conduct an annual wildfire preparedness workshop in collaboration with and open to any local fire department in its service area to provide updates on the latest adopted wildfire mitigation plan required by this section, discuss any lapses in, and opportunities to increase efficiency of, communication coordination during emergency responses pursuant to subparagraph (O) of paragraph (2) of subdivision (b), and gather input for inclusion in the development of the next annual submission of the wildfire mitigation plan required pursuant to paragraph (1) of subdivision (b).
SEC. 4.Section 8388.5 of the Public Utilities Code is amended to read:8388.5.(a)The commission shall establish an expedited utility distribution infrastructure undergrounding program consistent with this section.
(b)Only a large electrical corporation may participate in the program.
(c)In order to participate in the program, a large electrical corporation shall submit to the office a distribution infrastructure undergrounding plan that shall address or include, at minimum, all of the following components:
(1)A 10-year plan for undergrounding distribution infrastructure.
(2)Identification of the undergrounding projects that will be constructed as part of the program, including a means of prioritizing undergrounding projects based on wildfire risk reduction, public safety, cost efficiency, and reliability benefits. Only undergrounding projects located in tier 2 or 3 high fire-threat districts or rebuild areas may be considered and constructed as part of the program.
(3)Timelines for the completion of identified and prioritized undergrounding projects, and unit cost targets and mileage completion targets for each year covered by the plan.
(4)A comparison of undergrounding versus aboveground hardening of electrical infrastructure and wildfire mitigation for achieving comparable risk reduction, or any other alternative mitigation strategy, such as covered conductor and rapid earth fault current limiter devices, for those prioritized undergrounding projects, evaluating the scope, cost, extent, and risk reduction of each activity, separately and collectively, over the duration of the plan. The comparison shall emphasize risk reduction and include an analysis of the cost of each activity for reducing wildfire risk, separately and collectively, over the duration of the plan.
(5)A plan for utility and contractor workforce development.
(6)An evaluation of project costs, projected economic benefits over the life of the assets, and any cost containment assumptions, including the economies of scale necessary to reduce wildfire risk and mitigation costs and establish a sustainable supply chain.
(d)Upon a large electrical corporation submitting a plan to the office, the office shall do both of the following:
(1)Publish the plan for public comment.
(2)Within nine months, review and approve or deny the plan. The office may only approve the plan if the large electrical corporation has shown that the plan will substantially increase electrical reliability by reducing the use of public safety power shutoffs, enhanced powerline safety settings, deenergization events, and any other outage programs, and substantially reduce the risk of wildfire. Before approving the plan, the office may require the large electrical corporation to modify the plan.
(e)(1)Upon the office approving a plan pursuant to paragraph (2) of subdivision (d), the large electrical corporation shall, within 60 days, submit to the commission a copy of the plan and an application requesting review and conditional approval of the plans costs and including all of the following:
(A)Any substantial improvements in safety risk and reduction in costs compared to other hardening and risk mitigation measures over the duration of the plan.
(B)The cost targets, at a minimum, that result in feasible and attainable cost reductions as compared to the large electrical corporations historical undergrounding costs.
(C)How the cost targets are expected to decline over time due to cost efficiencies and economies of scale.
(D)A strategy for achieving cost reductions over time.
(2)The assigned commissioner may waive the requirements of subdivisions (b), (d), (f), and (i) of Section 1701.3 for an application submitted to the commission pursuant to paragraph (1).
(3)In reviewing an application submitted to the commission pursuant to paragraph (1), the commission shall consider not revisiting cost or mileage completion targets approved, or pending approval, in the electrical corporations general rate case or a commission-approved balancing account ratemaking mechanism for system hardening.
(4)Upon the commission receiving an application pursuant to paragraph (1), the commission shall facilitate a public workshop for presentation of the plan and take public comment for at least 30 days.
(5)On or before nine months, the commission shall review and approve or deny the application. Before approving the application, the commission may require the large electrical corporation to modify or modify and resubmit the application.
(6)The commission shall consider continuing an existing commission-approved balancing account ratemaking mechanism for system hardening for the duration of a plan, as determined by the commission, and shall authorize recovery of recorded costs that are determined to be just and reasonable.
(f)If the plan is approved by the office and commission, the large electrical corporation shall do all of the following:
(1)Every six months, file a progress report with the office and the commission. The large electrical corporation and the office shall publish these progress reports on their internet websites.
(2)Include ongoing work plans and progress in annual wildfire mitigation plan filings.
(3)Hire an independent monitor, selected by the office, to review and assess the large electrical corporations compliance with its plan and submit a report with the office each December 1 over the course of the plan.
(g)(1)In reviewing and assessing the large electrical corporations compliance with its plan pursuant to paragraph (3) of subdivision (f), the independent monitor shall assess whether the large electrical corporations progress on undergrounding work has been consistent with the objectives identified in its plan. The independent monitors report shall specify any failure, delays, or shortcomings of the large electrical corporation and provide recommendations for improvements to accomplish the objectives set forth in the plan.
(2)The large electrical corporation shall have 180 days to correct and eliminate any deficiency specified in the independent monitors report.
(3)On or before December 1 of each year the plan is in effect, the independent monitor shall submit the report to the office.
(h)The office shall publish reports received pursuant to paragraph (3) of subdivision (g) on its internet website.
(i)(1)The office shall consider the independent monitors report and whether the large electrical corporation has cured any deficiencies, and may recommend penalties to the commission.
(2)The commission may assess penalties on a large electrical corporation that fails to substantially comply with a commission decision approving its plan.
(j)Each large electrical corporation participating in the program shall apply for available federal, state, and other nonratepayer moneys throughout the duration of its approved undergrounding plan, and any moneys received as a result of those applications shall be used to reduce the programs costs on the large electrical corporations ratepayers.
(k)(1)Notwithstanding subdivision (b), the commission shall require all electrical corporations to participate in the program created by this section and consistent with both of the following:
(A)The commission shall require that the distribution infrastructure undergrounding plan do both of the following:
(i)Include a thorough risk assessment, prioritize high fire risk areas, and provide detailed project timelines.
(ii)Include cost estimates, funding strategies, and establish a framework for community engagement and transparency throughout the process.
(B)For areas where undergrounding is not feasible, the commission shall require the distribution infrastructure undergrounding plan to include a detailed explanation of why undergrounding is not feasible and propose alternative solutions to mitigate risks associated with utility equipment, including, but not limited to, replacing overhead infrastructure with covered conductors or other equipment modernization actions that reduce the potential for fire hazards.
(2)The commission shall coordinate with the Office of Energy Infrastructure Safety to make participation in the program created by this section a requirement for obtaining the safety certificate issued pursuant to subdivision (e) of Section 8389.
(3)The commission shall adopt a decision on the financing of infrastructure projects conducted pursuant to the program created by this section that implements a revised return on equity structure for electrical corporations that caps the maximum allowable return on capital investment at a set percentage for undergrounding and that may include either of the following:
(A)Securitization for specific projects that replaces high-return on equity financing with a lower cost option.
(B)Public-private partnerships or public ownership models.
(4)The commission shall ensure that the decision adopted pursuant to paragraph (3) leads to reduced long-term expenses for customers.
SEC. 5.Chapter 8 (commencing with Section 8395) is added to Division 4.1 of the Public Utilities Code, to read:8.Regional Emergency Operations8395.(a)All electrical corporations and local publicly owned electric utilities that have a service area that overlaps with the boundaries of a state regional emergency operations center, in cooperation with the Office of Emergency Services, and other emergency service agencies, shall establish procedures for the coordination of efforts between electrical corporations and local publicly owned electric utilities and their representatives and those of emergency response agencies.
(b)All electrical corporations and local publicly owned electric utilities subject to subdivision (a) shall assign a representative to work within each state regional operations center that has boundaries that overlap with the electrical corporations or local publicly owned electric utilitys service area. The representative shall complete the appropriate Standardized Emergency Management System training.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.It is the intent of the Legislature to enact legislation to enhance the resiliency and reliability of Californias electrical infrastructure in areas prone to wildfires, earthquakes, and other natural disasters by requiring electrical utilities to prioritize the undergrounding of power lines, the implementation of microgrid technologies, and the strengthening of public safety power shutoff standards and accountability, while ensuring the utilization of labor standards that promote a skilled workforce, and providing the Public Utilities Commission with the ability to immediately access all relevant electrical fault data related to natural disasters.It is the intent of the Legislature to enact legislation to enhance the resiliency and reliability of Californias electrical infrastructure in areas prone to wildfires, earthquakes, and other natural disasters by requiring electrical utilities to prioritize the undergrounding of power lines, the implementation of microgrid technologies, and the strengthening of public safety power shutoff standards and accountability, while ensuring the utilization of labor standards that promote a skilled workforce, and providing the Public Utilities Commission with the ability to immediately access all relevant electrical fault data related to natural disasters.
|
Date
|
Status
|
|---|---|
| Aug 29, 2025 | August 29 hearing: Held in committee and under submission. |
| Aug 20, 2025 | August 20 set for first hearing. Placed on APPR. suspense file. |
| Jul 17, 2025 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 16, 2025 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 5. Noes 2.) (July 14). |
| Jul 10, 2025 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on E.M. |
| Jul 10, 2025 | From committee: Do pass and re-refer to Com. on E.M. (Ayes 13. Noes 4.) (July 9). Re-referred to Com. on E.M. |
| Jun 25, 2025 | June 25 set for first hearing canceled at the request of author. |
| Jun 16, 2025 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on U. & E. |
| Jun 9, 2025 | Referred to Coms. on U. & E. and E.M. |
| Jun 4, 2025 | In Assembly. Read first time. Held at Desk. |
| Jun 3, 2025 | Read third time. Passed. (Ayes 30. Noes 8. Page 1474.) Ordered to the Assembly. |
| May 23, 2025 | Read second time. Ordered to third reading. |
| May 23, 2025 | From committee: Do pass. (Ayes 5. Noes 1. Page 1193.) (May 23). |
| May 20, 2025 | Set for hearing May 23. |
| May 19, 2025 | May 19 hearing: Placed on APPR. suspense file. |
| May 9, 2025 | Set for hearing May 19. |
| May 5, 2025 | Read second time and amended. Re-referred to Com. on APPR. |
| May 1, 2025 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 14. Noes 2. Page 934.) (April 29). |
| Apr 11, 2025 | Set for hearing April 29. |
| Apr 2, 2025 | Re-referred to Com. on E., U & C. |
| Mar 26, 2025 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Feb 14, 2025 | Referred to Com. on RLS. |
| Feb 4, 2025 | From printer. May be acted upon on or after March 6. |
| Feb 3, 2025 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Jul 14, 2025 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Emergency Management |
Passed |
|
| Jul 9, 2025 | Do pass and be re-referred to the Committee on [Emergency Management] | Assembly Standing Committee on Utilities and Energy |
Passed |
|
| Jun 3, 2025 | Senate 3rd Reading SB256 Pérez | Senate Floor |
Passed |
|
| May 23, 2025 | Do pass | Senate Standing Committee on Appropriations |
Passed |
|
| May 19, 2025 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 29, 2025 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Altadena Chamber of Commerce & Civic Association | ** Support | |
| Altadena Library District | ** Support | |
| California Chamber Of Commerce | ** Against | |
| City of Santa Barbara | ** Support | |
| Jewish Federation of The Greater San Gabriel and Pomona Valleys | ** Support | |
| Los Angeles County Board of Supervisors | ** Support | |
| Midpeninsula Regional Open Space District | ** Support | |
| North American Wood Pole Council | ** Against | |
| Office of Los Angeles County Supervisor Lindsey P. Horvath | ** Support | |
| Other | ** Against | |
| Pacific Gas And Electric Company | ** Against | |
| San Diego Gas and Electric Company | ** Against | |
| Southern California Edison | ** Against | |
| Southern California Public Power Authority | ** Against | |
| The Climate Reality Project, Los Angeles Chapter | ** Support | |
| The Climate Reality Project, San Fernando Valley, CA Chapter | ** Support | |
| the state's large electric IOUs | ** Against | |
| Treated Wood Council | ** Against | |
| Western Wood Preservers Institute | ** Against |
Date of Hearing: August 20, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 256
Author:(Pérez) – As Amended Ver:July 17, 2025
Policy Committee: | Utilities and Energy | Vote: | 13 - 4 |
Emergency Management | 5 - 2 | ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill makes several, distinct requirements of electrical utilities related to management of their infrastructure, and their efforts to prevent that infrastructure from igniting fires.
Specifically, this bill, among other things:
- Requires the California Public Utilities Commission (CPUC), by January 1, 2027, to update its rules to require each electrical corporation (also known as an “investor-owned utility” or “IOU”) to remove all permanently abandoned facilities (generally meaning equipment such as electrical wires) to prevent public nuisances or hazards to life or property and directs the CPUC to ensure all applicable safety requirements, including wildfire mitigation measures, apply to permanently abandoned facilities until they are removed.
- Amends existing law that requires each IOU to annually prepare a wildfire mitigation plan (WMP) so that each IOU must include in its WMP (a) consideration of risks related to the wildland-urban interface (WUI), (b) descriptions of the IOU’s procedures for communicating with customers affected by deenergization events and with public safety partners able to coordinate with the IOU to communicate more broadly with affected communities, (c) descriptions of the IOU’s processes and procedures to coordinate communications with local governments, including fire officials and emergency response officials, (d) an accounting of all transmission facilities and, for permanently abandoned transmission facilities, a plan for how and when each facility will be removed and the wildfire mitigation measures that are being implemented to prevent hazards.
- Similarly amends existing law that requires each publicly owned electric utility (POU) and each electrical cooperative to annually prepare a WMP to include in its WMP (a) consideration of risks related to the WUI and (b) descriptions of the POU’s processes and procedures to coordinate communications with local governments, including fire officials and emergency response officials.
- For areas affected by wildfires that require an IOU to rebuild electrical distribution infrastructure, directs the IOU to consider undergrounding of electrical distribution infrastructure if it is determined to be cost effective compared to other wildfire mitigation strategies.
- Requires any IOU or POU that has a service area that overlaps with the boundaries of a state regional emergency operations center in cooperation with the Office of Energy Infrastructure Safety (OEIS) and other emergency service agencies, to establish procedures for the coordination of efforts between IOUs and POUs and emergency response agencies, and further requires any such IOU or POU to assign a representative, trained as specified, to work within each state regional operations center that has boundaries that overlap with the IOU’s or POU’s service area when requested by the state regional operations center.
FISCAL EFFECT:
This bill requires OEIS to update WMP guidelines, and will entail one-time costs, likely in the low hundreds of thousands of dollars for each of a year or two (special fund).
OEIS concludes it will also need to review WMPs to ensure they are consistent with the requirements of this bill, and identifies ongoing costs of $562,980 annually, starting in fiscal year 2026-27, for three regulatory analysts: two to review electrical IOU WMPs and one to review electrical POU WMPs. However, existing law already requires OEIS to review WMPs, so it is not clear it will need additional resources for WMP review.
Though this bill requires the CPUC to update its rules regarding abandoned IOU facilities the CPUC contends it can absorb the resulting workload with existing resources.
COMMENTS:
- Purpose. The author describes this bill as addressing “gaps in our state’s mitigation efforts” revealed by the recent wildfires in Southern California. According to the author, SB 256:
strengthens California’s wildfire and emergency response policies by expanding mitigation planning to include low-risk areas, addressing past communication failures to improve future coordination, requires prioritization for undergrounding in fire affected areas and restricts costs from being passed to ratepayers.
- Background. Following several years of particularly harmful wildfires, many of them sparked by equipment owned and operated by the state’s electric IOUs, state law required each of the state’s electrical utilities to regularly produce a WMP that describes how the utility will reduce the risk of wildfire associated with its equipment. In the case of the IOUs, the law requires each IOU to submit its WMP to OEIS, which determines whether the WMP will achieve the maximum feasible wildfire risk reduction. Subsequently, the CPUC reviews each IOU’s WMP to determine whether its costs are just and reasonable. The law similarly requires each POU annually adopt a WMP, which the POU submits to the California Wildfire Safety Advisory Board.
In addition, state law requires the Department of Forestry and Fire Protection (Calfire) to map fire hazards within certain areas of the state based on fuel loading, slope, fire weather, and other relevant factors, including areas where Calfire has identified winds as a major cause of wildfire spread. These areas are known as fire hazard severity zones, which Calfire classifies as moderate, high or very high, based on the average hazard across the area included in the zone.
In January of this year, several devastating wildfires tore through sections of Southern California, taking dozens of lives and causing hundreds of billions of dollars in property damage. Whipped by unusually forceful winds and fueled by exceptionally dry conditions, the fires burnt through broad sections of Southern California, including residential neighborhoods not classified by Calfire as at high risk for wildfire.
While investigations into the initial causes of the fires are ongoing, an abandoned electrical power line owned by electrical IOU Southern California Edison is the subject of suspicion and speculation.
The wildfires have led some, including the author, to conclude that the state’s current wildfire mitigation efforts are wanting. For example, the Los Angeles County Board of Supervisors writes in support of the bill, calling it;
a critical step toward closing those gaps by enhancing coordination between utilities and government emergency centers, improving preparedness, and ensuring utilities consider cost-effective undergrounding and other mitigation strategies without passing unnecessary costs to ratepayers.
Not all parties agree. The bill is opposed by the state’s large electric IOUs, who jointly assert the bill will “introduce significant financial and operational challenges stemming from regulatory redundancies, misaligned programs, and escalating infrastructure costs.”
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: July 14, 2025
ASSEMBLY COMMITTEE ON EMERGENCY MANAGEMENT
Rhodesia Ransom, Chair
SBPCA Bill Id:SB 256
Author:(Pérez) – As Amended Ver:July 10, 2025
SENATE VOTE: 30-8
SUBJECT: Electricity: electrical infrastructure: wildfire mitigation
SUMMARY: Requires a number of additional provisions be included in the wildfire mitigation plans provided by the Investor-Owned Utilities (IOUs), local publicly owned utilities, and electrical cooperatives. Enhances wildfire mitigation measures for abandoned electrical facilities and communications related to de-energization events and disasters between utilities, community members and local emergency management officials. Specifically, this bill:
- Finds and declares it is the intent of the Legislature to find sustainable ways to finance mitigation strategies for ratepayers and Californians to ensure the safety and affordability in the face of catastrophic wildfires in the State of California.
- Finds and declares it is the intent of Legislature that fire risk mitigation capital expenditures, including the decommissioning of permanently abandoned facilities and the undergrounding of electrical distribution infrastructure after a wildfire event, be financed in ways that reduce the impact to ratepayers.
- Requires California Public Utilities Commission (CPUC), on or before January 1, 2027, to update General Order No. 95 to require each electrical corporation to remove all permanently abandoned facilities in order to prevent public nuisances or hazards to life or property and specifies this update shall not impact an electrical corporation’s right to an easement.
- Requires the CPUC to ensure all applicable safety requirements, including wildfire mitigation measures, apply to “permanently abandoned facilities” until they are removed. A permanently abandoned facility is a facility that is out of service and will remain out of service for a time determined by the CPUC, as specified.
- Adds risks related to the wildland-urban interface to the description of the preventive strategies and programs to be adopted by the electrical corporation, publicly owned electric utility, and electrical cooperative to minimize the risks of its electrical lines and equipment causing catastrophic wildfires as required in the annual preparation and submission of a wildfire mitigation plan to the Office of Energy Infrastructure Safety.
- Requires procedures for notifying customers who may be impacted by a de-energizing event to include consideration of enabling residents within a household who are not the customer of record to subscribe to receive notifications related to such an event.
- Requires procedures for notifying customers who may be impacted by a de-energizing event to include consideration of communication with public safety partners who have the ability to coordinate with the electrical corporation to provide broader messaging to affected communities.
- Requires an electrical corporation’s, a publicly owned electric utility’s, and an electrical cooperative’s wildfire mitigation plan to include a description of the processes and procedures that the electrical corporation uses to coordinate its communications with local governments within the service area, as specified.
- Requires an electrical corporation’s wildfire mitigation plan to include an accounting of all transmission facilities, including a list of facilities that are in service, facilities that are out of service, and permanently abandoned facilities. For permanently abandoned facilities, the accounting shall include a plan for when each facility will be removed, as specified.
- Requires, for areas affected by wildfires, electrical distribution infrastructure to be rebuilt by an electrical corporation, the electrical corporation shall consider the undergrounding of electrical distribution infrastructure if it is determined to be cost effective compared to other wildfire mitigation strategies.
- Requires all electrical corporations and local publicly owned electric utilities that have service areas that overlap with the boundaries of a state regional emergency operations center, in cooperation with Office of Emergency Services (OES), and other emergency service agencies, to establish procedures for the coordination of efforts between electrical corporations and local electric POUs and their representatives and those of emergency response agencies.
- Requires these electrical corporations and local publicly owned electric utilities to assign a representative to work within each state regional operations center that has boundaries that overlap with the electrical corporation’s or local electric POU’s service area.
- Requires the representative to complete the appropriate Standardized Emergency Management System training.
- Provides that no reimbursement would be required for specified reasons.
EXISTING LAW:
1) Establishes the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
2) Establishes the Office of Energy Infrastructure Safety (OEIS) is the successor to, and, effective July 1, 2021, is vested with, all of the duties, powers, and responsibilities of the Wildfire Safety Division within the CPUC established pursuant to Section 326 of the Public Utilities Code, including, but not limited to, the power to compel information and conduct investigations. (Government Code Section 15475)
3) Requires every public utility to furnish and maintain adequate, efficient, just, and reasonable service, instrumentalities, equipment, and facilities, as are necessary to promote the safety, health, comfort, and convenience of its patrons, employees, and the public. (Public Utilities Code Section 451)
4) Establishes the policy of the state that each electrical corporation is required to continue operate its electric distribution grid in its service territory and to do so in a safe, reliable, efficient, and cost-effective manner. (Public Utilities Code Section 399.2(a))
5) Authorizes the CPUC to supervise and regulate every public utility in the state and to do all things necessary and convenient in the exercise of such power and jurisdiction. (Public Utilities Code Section 701)
6) Requires an electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. (Public Utilities Code Section 8386 (a))
7) Requires each electrical corporation to annually prepare a wildfire mitigation plan (WMP) and to submit the plan to the Wildfire Safety Division, and, as of July 1, 2021, to the OEIS, for review and approval. (Public Utilities Code Section 8386 (b))
8) Requires a WMP of an electrical corporation to include, among other things, protocols for deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, and protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communications infrastructure. (Public Utilities Code Section 8386 (c)(6))
9) Requires a WMP plan of an electrical corporation to also include appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines and requires these procedures to consider the need to notify, as a priority, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of a potential deenergization event. (Public Utilities Code Section 8386 (c)(7))
10) Requires the WMP of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits. (Public Utilities Code Section 8386 (c)(8))
11) Requires the CPUC to establish an expedited utility distribution undergrounding program. Requires, to participate in the program, large electrical corporations to submit to the OEIS a distribution infrastructure undergrounding plan meeting certain requirements. Requires the OEIS upon the submission of the plan, to publish the plan for public comment. (Public Utilities Code Section 8388.5)
FISCAL EFFECT: According to the Senate Committee on Appropriations, “ The Office of Energy Infrastructure Safety (OEIS) estimates ongoing costs of $562,980 annually (ratepayer funds) and 3 positions to modify WMP guidelines and review WMPs consistent with the requirements of this bill. The CPUC estimates ongoing costs of about $474,000 annually (ratepayer funds) and 2 positions to cover additional workload related to safety certification, WMP review, and analysis of undergrounding project financing structures. To the extent that this bill impacts electricity rates, it could result in costs or savings to the state as an electric utility ratepayer. The State of California is an electricity customer, purchasing roughly one percent of the state’s electricity. As such, the state incurs costs when rates increase, and realizes cost savings if rates go down (various funds).”
COMMENTS:
Purpose of the bill: According to the author, “Over the past decade, California’s wildfires have destroyed a total of 53,970 structures and claimed 207 lives, with numerous incidents traced back to electrical infrastructure failures. The Eaton and Palisades fires in Los Angeles County alone destroyed 16,246 structures and caused 30 deaths, ranking it amongst the most destructive. UCLA estimates the broader economic impact for Los Angeles County could reach $131 billion, with up to $45 billion in insured losses and $297 million in lost wages. While investigations are ongoing, Southern California Edison has acknowledged that a decommissioned line may have played a role in lighting the Eaton fire[1].
To address this crisis, the Legislature has strengthened oversight of electrical utilities through Wild Fire Mitigation Plans, creating a plan to remove decommissioned lines, system hardening, and Safety Power Shutoffs (PSPS). It also authorized a long-term power line undergrounding program. Governor Newsom recently ordered an acceleration of underground utility systems in fire-damaged areas like Altadena and Palisades.
However, the recent wildfires revealed gaps in our state’s mitigation efforts. While the Altadena area was not officially classified as high risk, the destruction of the Eaton Fire underscores the need to expand how wildfire risk is assessed. Slow response time to firefighters during the wildfires, as reported by the media, highlight the need for better coordination with emergency services. This includes assessing PSPS to ensure decisions on power shutoffs are transparent and clearly communicated. Although undergrounding of high-risk power lines is a well-established wildfire prevention strategy, participation in the state’s program is voluntary.
SB 256 strengthens California’s wildfire and emergency response policies by expanding mitigation planning to include low-risk areas and addressing past communication failures to improve future coordination. It also requires annual preparedness workshops, mandates utilities to collaborate with regional emergency centers, and enhances PSPS notifications. Finally, it also requires prioritization for undergrounding in fire affected areas when it is the best option and restricts certain costs from being passed to ratepayers and for the IOU’s to create a plan for removing decommissioned lines.”
Equity impact: According to the author’s staff, “SB 256 will positively impact vulnerable communities by promoting safe and transparent communication during times of emergencies with utilities and local jurisdictions. The undergrounding provision being tied to fire affected areas and including a cap on rates will ensure disadvantaged communities that are affected by fires will be able to improve their electrical infrastructure without drastically increasing their rates.”
January 2025 Firestorms in Los Angeles: On January 7, 2025, following consistent forecasts for dangerous fire weather conditions, the Los Angeles Fire Department pre-deploys and pre-positions resources, including fire engines, command teams, brush patrols, water tenders and air operations personnel at 8:00am. Thirty minutes later, a hiker near the source of the Palisades Fire reports smelling smoke. At 10:20am, an AlertCalifornia wildfire detection camera detects smoke rising. CAL FIRE reports the Palisades Fire has started southeast of Palisades Drive in the Pacific Palisades at 10:30am. The Palisades Fire erupts, growing from 10 to 200 acres within a half hour and prompting evacuation warnings and orders.
Near noon, Governor Gavin Newsom proclaims a State of Emergency in Los Angeles and Ventura Counties due to fire and windstorm conditions. The Palisades Fire has grown to 1,200 acres at the time of his declaration.[2] By 2:30pm, the Palisades Fire has spread to 700 acres and is making a run towards the Pacific Coast Highway. According to the Los Angeles Fire Department, 10,000 houses are threatened and there are 250 city firefighters on scene in addition to 100 Los Angeles County Fire Department Firefighters deployed to assist. Extreme fire behavior, including short and long-range spotting, continues to challenge firefighting efforts for the Palisades Fire. CAL FIRE Incident Management Team II is activated to assist Los Angeles County Fire and Los Angeles City Fire Departments as winds gust up to 60 mph and the fire grows to 1,262 acres by 4:00pm.[3]
At 6:18pm, CAL FIRE reports the Eaton Fire has begun in Altadena, describing the incident as a "fast-moving fire burning brush fueled by high winds," prompting evacuation orders.[4] Given the dire conditions of simultaneous conflagrations, the Los Angeles Fire Department calls on all of its firefighters to report for duty and the LA County Fire Department’s incident commander orders 10 strike teams (50 engines) to help contain the Eaton Fire.
Palisades and Eaton Fires: At its height, the fires placed an estimated 331,335 people on an evacuation advisory, with nearly 192,000 residents facing mandatory evacuation and roughly 140,000 subject to warnings. The blazes burned a combined 37,469 acres and leveled entire communities in the Pacific Palisades and Altadena neighborhoods of LA County.
The Eaton Fire became the second most destructive fire in California history after destroying 9,418 buildings. The Palisades Fire is the third most destructive fire in state history, with 6,837 structures destroyed. As firefighters were battling the largest conflagrations, additional fires broke out in the Los Angeles area. Crews were able to stop the forward spread and contain the blazes. These fires included the Lidia, Archer, Woodley, Sunset, Kenneth, Hurst and Auto fires, which burned close to 2,400 acres between them.
Two weeks after the initial fires, the Hughes Fire began near Castaic Lake in northern Los Angeles County on January 22 and quickly grew to over 10,000 acres. It was fully contained on January 30 after covering 10,425 acres.
The Eaton and Palisades Fires devastated the lives of thousands in Altadena, Pacific Palisades, Malibu, Sierra Madre, Pasadena, and Los Angeles. More than 6,000 homes across 22 square miles were destroyed, some more than two miles deep into Altadena. At least 18 Angelenos lost their lives in the Eaton Fire, many during the night in west Altadena, and at least 12 Angelenos lost their lives in the Palisades Fire.
Wildfires and Utility Lines: California continues to experience increased, intense, and record-breaking wildfires in Northern and Southern California. These fires have resulted in devastating loss of life and billions of dollars in damage to property and infrastructure. Electric utility infrastructure has historically been responsible for less than ten percent of reported wildfires; however, fires attributed to power lines comprise roughly half of the most destructive fires in California history.
With the continuing threat of wildfire, utilities may proactively cut power to electrical lines that may fail in certain weather conditions to reduce the likelihood that their infrastructure could cause or contribute to a wildfire. This effort to reduce the risk of fires caused by electric infrastructure by temporarily turning off power to specific areas is called a Public Safety Power Shutoff (PSPS). However, a PSPS can leave communities and essential facilities without power, which brings its own risks and hardships, particularly for vulnerable communities and individuals.
PSPS during January 2025 Firestorms in Los Angeles: The Assembly Committee on Utilities and Energy’s analysis of this bill notes, “On January 2, 2025, SCE initiated a PSPS event and de-energized 363,196 customer accounts.[5] These accounts include 11,740 Medical Baseline customer accounts, 90,632 Access and Functional Needs customer accounts, and 6,800 critical facilities accounts.[6] Fifteen days later, in the afternoon of January 17, 2025, SCE restored power to all customers.[7] According to the Public Advocates Office, during the Southern California fires in 2025, SCE failed to send 307,211 required notifications to Public Safety Partners, Critical Facilities and Infrastructure, and customers.[8] Cal Advocates found that the events in 2025 continued a pattern of failure of SCE to provide its customers with advance notification prior to de-energization.”
Notification Protocols Implemented by the CPUC: In 2012, the CPUC released protocols for utilities to follow during de-energization events. In 2019, the CPUC implemented Phase 1 PSPS notification guidelines. The Commission stated that electric IOUs should, whenever possible, adhere to the following minimum notification timeline:
- 48-72 hours in advance of anticipated de-energization: notification of public safety partners priority notification entities.
- 24-48 hours in advance of anticipated de-energization: notification of all other affected customers.
- 1-4 hours in advance of anticipated de-energization, if possible: notification of all affected customers.
- When de-energization is initiated: notification of all affected customers.
- Immediately before re-energization begins: notification of all affected customers.
- When re-energization is complete: notification of all affected customers.
In 2020, Phase 2 guidelines directed electric IOUs to provide enhanced customer-friendly communication during all phases of a PSPS event, minimize the impact on customers, and increase accountability with regional Working Groups and in reports. In 2021, Phase 3 guidelines were implemented and are ongoing. They require IUOs to take a results-based approach to improve notification and mitigate the impacts of PSPS events.
Wildfire Mitigation Plans (WMPs): Under SB 1028 (Hill, Chapter 598, Statutes of 2016), SB 901 (Dodd, Chapter 626, Statutes of 2018) and AB 1054 (Holden, Chapter 79, Statutes of 2019), electric investor-owned utilities (IOUs) are required to file WMPs with guidance by OEIS (as of 2021). OEIS reviews and determines whether to approve these plans and ensures compliance with guidance and statute. The electric IOUs’ WMPs detail, describe and summarize electric IOU responsibilities, actions, and resources to mitigate wildfires. These actions include plans to harden their system to prevent wildfire ignitions caused by utility infrastructure, such as widespread electric line replacement with covered conductors designed to lower wildfire ignition, pole replacement, and other actions. The plans also include information regarding the electric IOUs’ efforts to conduct extensive vegetation management to reduce the risk of tree branches, grasses, and other vegetation from coming into contact with utility infrastructure. The WMPs are publicly available and require electric utilities to incorporate their protocols and procedures for proactive power shutoffs as required by CPUC rules.
Committee amendment:
- To strengthen the collaboration, preparedness and response of emergency management and utility professionals, the author may wish to modify the regional emergency operations section of the bill as follows:
CHAPTER 8. Emergency Operations
8395. (a) All electrical corporations and local publicly owned electric utilities that have a service area that overlaps with the boundaries of a county state regional emergency operations center, in cooperation with the Office of Emergency Services and other emergency service agencies, shall establish procedures for the coordination of efforts between electrical corporations and local publicly owned electric utilities and their representatives and those of emergency response agencies.
(b) All electrical corporations and local publicly owned electric utilities subject to subdivision (a) shall assign a liaison representative to work within each county state regional operations center that has boundaries that overlap with the electrical corporation’s or local publicly owned electric utility’s service area. The representative shall complete the appropriate Standardized Emergency Management System and National Incident Management trainings, sufficient to enable them to assist activated Emergency Operations Centers, to the fullest extent possible.
Arguments in support: The Altadena Chamber of Commerce and Civic Association writes, “On behalf of Altadena Chamber of Commerce & Civic Association, I am pleased to support SB
256, which will strengthen California’s wildfire mitigation by improving planning, enhancing emergency response, and increasing public safety through better communication and undergrounding of power lines. Wildfire Mitigation Plan (WMP) Guidelines prioritize high-risk areas; however, gaps in planning highlight the need to reassess vulnerabilities, including in low-risk zones that still face threats. While the Altadena area was not officially classified as high risk, an analysis by the Los Angeles Times found that 94% of properties within the fire’s perimeter had “severe” or “extreme” fire risk. The Eaton fire also exposed deficiencies that need to be addressed, such as reassessing infrastructure safety and emergency response coordination between utilities and responders, as well as the need for greater transparency when PSPS is used to reduce uncertainty during wildfire emergencies.”
County of Los Angeles Supervisor Lindsey Horvath writes, “As the Supervisor for the Third District of Los Angeles County, I am pleased to support SB 256 (Pérez), which will strengthen California’s wildfire mitigation by improving planning, enhancing emergency response, and increasing public safety through better communication and undergrounding of power lines. SB 256 strengthens wildfire and emergency managements by addressing past coordination gaps, improving preparedness and requiring collaboration between utilities and government emergency centers. It mandates annual workshops, enhances PSPS notifications, and expands underground efforts for safer electrical infrastructure.”
Arguments in opposition: The California Chamber of Commerce writes, “SB 256 mandates public disclosure of detailed information about transmission infrastructure and idle or abandoned facilities in a way that may conflict with established CPUC protocols for safeguarding critical energy infrastructure information. The CPUC explicitly restricts public access to such data to prevent exploitation by malicious actors. By requiring utilities to publish inventories of transmission assets and decommissioning plans, SB 256 disregards these protections and creates new vulnerabilities for California’s electric grid.”
Double referral: This bill is double referred. This bill was passed by the Assembly Committee on Utilities and Energy on July 9, 2025.
Related legislation: SB 254 (Becker) of this Session. Includes various proposals to address electric utility bill affordability, including requirements to consider the time required to implement an action and the amount of risk reduced when electric utilities implement wildfire mitigation strategies. (Pending in the Assembly Committee on Utilities and Energy)
SB 332 (Wahab) of this Session. Includes various proposals, including consideration of underground of electrical infrastructure within an electrical corporation’s wildfire mitigation plan. (Pending in the Assembly Committee on Appropriations)
SB 559 (Stern) of this Session. Would require electrical corporations to provide specified notifications of deenergization events related to mitigating wildfire ignition risks, and requires specified reporting to, and oversight by, the CPUC. (Held in Senate Committee on Appropriations)
Prior legislation: SB 1003 (Dodd) of 2024, would have modified timelines relevant to the wildfire mitigation plans by electrical corporations and requires the electrical corporations to take into account both the time required to implement an action and the amount of risk reduced for the costs and risk remaining. (Held on the Assembly Floor)
SB 884 (McGuire, Chapter 819, Statutes of 2022) required the CPUC to establish an expedited electric utility distribution infrastructure undergrounding program for large electrical corporations.
SB 533 (Stern, Chapter 244, Statutes of 2021) required electrical corporations to identify circuits that have frequently been deenergized to mitigate the risk of wildfire and the measures taken to reduce the need for future deenergization of those circuits, as specified.
AB 1054 (Holden, Chapter 79, Statutes of 2019) included numerous provisions related to addressing wildfires caused by electric utility infrastructure, including: bolstering safety oversight and processes, recasting recovery of costs from damages to third-parties, including the authorization for an electrical corporation and ratepayer jointly funded Wildfire Fund to address future damages.
SB 167 (Dodd, Chapter 403, Statutes of 2019) required electrical corporations to include impacts on customers enrolled in specified programs as part of the protocols for deenergizing portions of their distribution system within their WMP.
SB 901 (Dodd, Chapter 626, Statutes of 2018) addressed numerous issues concerning wildfire prevention, response and recovery, including funding for mutual aid, fuel reduction and forestry policies, WMP by electric utilities, and cost recovery by electric corporations of wildfire-related damages.
SB 1028 (Hill, Chapter 598, Statutes of 2016) required electric CPUC-regulated utilities to file annual WMPs and requires the CPUC to review and comment on those plans.
REGISTERED SUPPORT / OPPOSITION:
Support
Altadena Chamber of Commerce & Civic Association
Altadena Library District
City of Santa Barbara
County of Los Angeles Board of Supervisors
Jewish Federation of the Greater San Gabriel and Pomona Valleys
Midpeninsula Regional Open Space District
Office of Los Angeles County Supervisor Lindsey P. Horvath
The Climate Reality Project, Los Angeles Chapter
The Climate Reality Project, San Fernando Valley CA Chapter
Opposition
California Chamber of Commerce
North American Wood Pole Council
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison
Treated Wood Council
Western Wood Preservers Institute
Analysis Prepared by: Mike Dayton / E.M. / (916) 319-3802
“SoCal Edison probing whether idled electrical line sparked Eaton Fire”, NBC Bay Area, Edison probing whether idled electrical line sparked Eaton fire – NBC Bay Area. 8 February 2025. ↑
https://www.gov.ca.gov/2025/01/07/governor-newsom-proclaims-state-of-emergency-meets-with-first-responders-in-pacific-palisades-amid-dangerous-fire-weather/ ↑
https://www.fire.ca.gov/incidents/2025/1/7/palisades-fire/updates/b5ee529b-be05-4c4a-8892-5463128f2c1d ↑
https://www.fire.ca.gov/incidents/2025/1/7/eaton-fire/updates/35f4cb4c-4023-4484-a7b2-d0c2a40a5880 ↑
Southern California Edison, January 2, 2025 to January 17, 2025, March 3, 2025 (SCE 25-1 Post-Event Data Workbook), Table 5. ↑
CPUC, Decision 19-05-042, May 30, 2019 ↑
SCE 25-1 Post-Event Data Workbook, Table 5. ↑
Comments of the Public Advocates Office on Southern California Edison Company’s Public Safety Power Shutoff Post-Event Report - January 2 TO 17, 2025, Rulemaking 18-12-005, March 18, 2025 ↑
Date of Hearing: July 9, 2025
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
SBPCA Bill Id:SB 256
Author:(Pérez) – As Amended Ver:June 16, 2025
SENATE VOTE: 30-8
SUBJECT: Electricity: electrical infrastructure: wildfire mitigation
SUMMARY: Requires a number of additional provisions included in the wildfire mitigation plans provided by the Investor-Owned Utilities (IOUs) and the Public-Owned Utilities (POUs), and electrical cooperatives. The bill also requires the removal of abandoned electrical facilities, prohibits IOUs from including wildfire mitigation related capital expenditures from being included in its equity rate base, as well as requires coordination efforts between utilities and local emergency response agencies.
Specifically, this bill:
- Adds specific provisions that must be included in the Wildfire Mitigation Plans (WMPs) provided by Investor-Owned Utilities (IOUs). These include:
- Requiring IOUs to consider in their deenergization protocols:
- Residents within a household who are not the customer of record to subscribe to receive deenergization notifications.
- Communication with public safety partners.
- Requiring the identification of any lapses in communication coordination during emergency response events with local governments and a description of opportunities to establish more efficient communication coordination
- Considering undergrounding distribution infrastructure when rebuilding if it is determined to be cost effective compared to other wildfire mitigation strategies.
- Conduct an annual wildfire preparedness workshop in collaboration with any local fire department to review and gain feedback about wildfire protocols, mitigation plans and past events.
- Requiring IOUs to consider in their deenergization protocols:
- Mandates the California Public Utilities Commission (CPUC) to require the IOUs to exclude their share of fire risk mitigation capital expenditures in their equity rate bases, as specified, for expenditures authorized by the CPUC on or after January 1, 2025.
- Adds a requirement to the WMPs provided by POUs and electrical cooperatives to include a description of processes by which the POU or coop coordinates communication with local governments in their service area, both prior to and during a wildfire-related emergency.
- IOUs and POUS that have overlapping service areas with the boundaries of a regional emergency operations center will establish coordination procedures, including assigning a representative who will complete appropriate training.
- Requires the CPUC to mandate IOUs to remove all permanently abandoned facilities in order to prevent public nuisances or hazards to life or property and ensure all applicable safety requirements apply to these facilities until removed.
EXISTING LAW:
- Establishes and vests the CPUC with regulatory authority over public utilities, including electric IOUs. Authorizes the CPUC to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. (Article XII of the California Constitution and Public Utilities Code § 451)
- Authorizes the CPUC to supervise and regulate every public utility in the state (Public Utilities Code § 701)
- Establishes the Office of Energy Infrastructure Safety (OEIS) within the Natural Resources Agency, which, as of July 1, 2021, subsumed the Wildfire Safety Division (WSD) responsibilities at the CPUC, including to review the Wildfire Mitigation Plans of IOUs. (Government Code §§ 15740 et seq. and 15475.6, Public Utilities Code §§ 326 and 8385)
- Establishes the Underground Safety Board within Energy Safety to coordinate education and outreach activities that encourage safe excavation practices, along with developing standards and investigating violations, as specified. (Government Code § 4216.12)
- Authorizes the California Consumer Power and Conservation Financing Authority (CPA) to establish, finance, purchase, lease, own, operate, or construct generating facilities and other energy-related projects to supplement California's power supply. (Public Utilities Code § 3310)
- Permits the California Public Utilities Commission (CPUC) to allow for the recovery of costs and expenses arising from a covered wildfire occurring after January 1, 2019, if the CPUC finds the costs and expenses just and reasonable (Public Utilities Code § 451.1)
- Authorizes an IOU to request the CPUC issue a financing order to authorize the recovery, through securitization, of costs and expenses related to a catastrophic wildfire (with an ignition date in 2017 or after January 1, 2019) or undercollection amounts accrued in 2020. (Public Utilities Code § 850)
- Authorizes an IOU to request securitization to finance its share of the first $5 billion of approved wildfire mitigation capital expenditures and the debt financing costs of those expenditures. Prohibits the CPUC from allowing the large IOUs to earn a return on equity on the mandated fire risk mitigation capital expenditures. (Public Utilities Code § 8386.3)
- Requires the CPUC to create an expedited program for undergrounding utility distribution infrastructure to reduce wildfire risk. Only large electrical corporations can participate. To join, a utility must submit a detailed 10-year undergrounding plan to the Office of Energy Infrastructure Safety, prioritizing projects in high fire-risk areas and justifying undergrounding over other mitigation methods. If Energy Safety approves the plan, the IOU must then seek the CPUC’s conditional approval of the plan’s costs and targets. Once approved, the utility must regularly report progress, hire an independent monitor to oversee compliance, and apply for external funding to offset costs to ratepayers. The office and CPUC have the authority to require corrections or impose penalties if the utility fails to meet its plan objectives. (Public Utilities Code § 8388.5)
- Requires each IOU to annually prepare and submit to Energy Safety a WMP for review and approval. Requires the WMP to include a description of preventative strategies and programs to minimize the risk of catastrophic wildfire, including consideration of dynamic climate change risk; a description of the metrics used to evaluate the plan’s performance and underlying assumptions for the use of those metrics; and a list that identifies, describes, and prioritizes all wildfire risks and drivers of those risks throughout the IOU’s service territory. (Public Utilities Code § 8386)
- Requires an electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. Requires each electrical corporation to annually prepare a wildfire mitigation plan (WMP) and to submit the plan to the Wildfire Safety Division, and, as of July 1, 2021, to the OEIS, for review and approval. (Public Utilities Code § 8386)
- Requires a WMP of an electrical corporation to include, among other things, protocols for de-energizing portions of the electrical distribution system that consider the associated impacts on public safety, and protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communications infrastructure, and notifications to affected customers. (Public Utilities Code §§ 8386)
FISCAL EFFECT: Unknown. This bill is keyed fiscal and will be referred to the Assembly Committee on Appropriations for its review. According to the Senate Appropriations Committee, an earlier version of this measure resulted in approximately $562,980 annually to OEIS, and about $474,000 annually to the CPUC to implement. This bill has since been amended to include new requirements on the CPUC, which may impact these values.
CONSUMER COST IMPACTS: Unknown.
BACKGROUND:
Wildfire Mitigation Plans – Wildfire Mitigation Plans were initiated by the enactment of SB 1028 (Hill, Chapter 598, Statutes of 2016). These original Wildfire Mitigation Plans included, among other provisions, a description of preventative strategies and programs that can minimize risk of catastrophic wildfires. They were approved by the CPUC in June 2019 through the rulemaking process. Later in 2019, the Legislature revised the scope of the WMP to cover at least a three-year period[1] and divided oversight of the plans between OEIS (originally the Wildfire Safety Division housed under the CPUC) and the CPUC.[2] OEIS is tasked with assessing safety; they evaluate if proposed actions in the WMP achieve the maximum feasible wildfire risk reduction.[3] The CPUC is then tasked with reviewing cost; they evaluate if the cost of implementing each mitigation effort in the WMP is just and reasonable for purposes of cost recovery. The CPUC also has enforcement authority with regard to an IOU’s progress and performance on their WMPs.
De-energization Notification Protocols Implemented by the CPUC – Starting in 2012, the CPUC released protocols for utilities to follow during de-energization events. The first Public Safety Power Shutoff (PSPS) guidance released by the CPUC was specifically for SDG&E and required notification of customers.[4] In 2018, the CPUC adopted Resolution ESRB-8, which extended the requirements of the 2012 guidance for SDG&E to all electric investor-owned utilities (IOUs).[5] Among other provisions, the resolution required customer notifications prior to a de-energization event, and required notification to the Safety and Enforcement Division once the de-energization decision is made, and within 30 minutes after the last service is restored.
In 2019, the CPUC implemented Phase 1 PSPS notification guidelines.[6] The Commission stated that electric IOUs should, whenever possible, adhere to the following minimum notification timeline:
- 48-72 hours in advance of anticipated de-energization: notification of public safety partners priority notification entities
- 24-48 hours in advance of anticipated de-energization: notification of all other affected customers
- 1-4 hours in advance of anticipated de-energization, if possible: notification of all affected customers
- When de-energization is initiated: notification of all affected customers.
- Immediately before re-energization begins: notification of all affected customers.
- When re-energization is complete: notification of all affected customers.
In 2020, Phase 2 guidelines directed electric IOUs to provide enhanced customer-friendly communication during all phases of a PSPS event, minimize the impact on customers, and increase accountability with regional Working Groups and in reports. In 2021, Phase 3 guidelines were implemented and are ongoing. They require IUOs to take a results-based approach to improve notification and mitigate the impacts of PSPS events.
History of IOU Emergency De-energization Notification Problems –
Year | PG&E | SCE | SDG&E |
2022 | 4,198 | 34,171 | 0 |
2023 | 4,738 | 82,212 | 0 |
2024 | 11,685 | 76,767 | 6,330 |
2025 | 657 | 385,588 | 12,266 |
Table 1 shows the total notification failures accumulated by PG&E, SCE, and SDG&E from 2022 to 2025 during PSPS events.[7] |
As outlined in the protocols above, IOUs are required to send notifications to customers on a specified schedule prior to the expected de-energization and until re-energization. These notifications are intended to give customers adequate warning to prepare in advance for a proactive de-energization, which the IOUs perform as a last resort when weather conditions could result in a devastating wildfire. Timely notification allows customers to prepare for potential outages and make necessary arrangements based on the information provided.
There has been a history of problems with PSPS notification systems across the IOUs since the initiation of these protocols. In 2021, the CPUC fined Pacific Gas & Electric (PG&E) $106 million for violating guidelines during PSPS events in the Fall of 2019. These violations included failures notifying many customers and public safety partners. In 2023, PG&E was fined $8 million as a result of failing to notify any of its impacted customers during its 2020 PSPS events.[8] These failures are not limited to PG&E. In 2020, Southern California Edison (SCE) initiated sixteen PSPS events and failed to notify 25,573 customers, resulting in a $7 million fine.[9] This was followed by twelve PSPS events initiated by SCE in 2021, during which SCE failed to send 232,719 notifications.[10] Table 1 shows the recent notification failures accumulated by PG&E, SCE, and San Diego Gas & Electric (SDG&E) during PSPS events. Table 1 shows SCE has consistently had an increasing number of notification failures over the years, compared to PG&E and SDG&E. These trends are made clear in Figure 1 below, which shows the percentage of customers that PG&E, SCE, and SDG&E de-energized without 24-48 hour advance notifications, for each event since 2022. As shown in the Figure 1, SCE has had more severe notification failures – where high percentages of impacted customers never received a notice – than the other utilities.
According to the Public Advocates Office, in the 2023-2024 season, starting in October, SCE failed to meet customer notification requirements for as much as 79% of customers.[11] In addition to the many fines implemented, many corrective actions have been required by all IOUs as a result of failed PSPS guideline compliance. The Center for Accessible Technology has suggested that few corrective actions have been effective at improving issues with SCE’s notification systems.[12]
Figure 1: Percentage of de-energized customers who did not receive 24-48 hour advance notification for each IOU, for each PSPS event, from 2022 through January 2025[13] |
PSPS during the Southern California Fires of 2025 – On January 2, 2025, SCE initiated a PSPS event and de-energized 363,196 customer accounts.[14] These accounts include 11,740 Medical Baseline customer accounts, 90,632 Access and Functional Needs customer accounts, and 6,800 critical facilities accounts.[15] Fifteen days later, in the afternoon of January 17, 2025, SCE restored power to all customers.[16] According to the Public Advocates Office, during the Southern California fires in 2025, SCE failed to send 307,211 required notifications to Public Safety Partners, Critical Facilities and Infrastructure, and customers.[17] Cal Advocates found that the events in 2025 continued a pattern of failure of SCE to provide its customers with advance notification prior to de-energization.
Wildfire Spending[18] – Over the last five years,[19] $16 billion of wildfire mitigation costs have been authorized to be collected from customers, in addition to approximately $11 billion for wildfire insurance premiums and catastrophic event costs.[20] Collectively, these “wildfire-related” costs resulted in over $5 billion per year over the last 5 years, when averaged amongst the three largest IOUs.[21] These wildfire-related costs have amounted to roughly 18% of overall system costs[22] for PG&E, 12% for SCE, and 9% for SDG&E,[23] as of 2023. For residential customers, these wildfire-related costs have led to a monthly $24 increase on the average 2023 bill for PG&E, a $18 increase for SCE, and a $13 increase for SDG&E; comprising between 7-12% of total monthly bills.[24]
While wildfire-related operating expenses, such as vegetation management and liability insurance coverage, make up the majority of these recent cost increases, wildfire-related capital expenses are anticipated to grow in time. Capital-related expenses, such as installing covered conductors or undergrounding portions of a distribution system, have a larger cumulative impact on rates relative to operating expenses, as capital costs are recovered over a much longer time horizon during which the IOUs also earn an authorized profit.
Ratepayers have been shielded from some of the cost impacts of these capital expenses due to two provisions of AB 1054 (Holden, Chapter 79, Statutes of 2019): 1) the first $5 billion of capital spending is excluded from earning a Return on Equity (i.e. shareholder profit); and 2) the first $5 billion of capital spending may also be securitized through a CPUC financing order rather than through more traditional unsecured bond offerings. The equity rate base exclusion of #1 is estimated to save ratepayers as much as $2 billion over the life of those capital assets.[25] The securitization of #2 benefits ratepayers by allowing the IOUs to finance wildfire-related capital projects with lower interest rates than would otherwise be available.
Risks and Rules Regarding Permanently Abandoned Utility Lines – The risk posed by abandoned electrical utility lines includes injury, such as electrocution, and wildfire, among others. In July of 2020, it was determined by CAL FIRE that the 2019 Kincade Fire, which burned 77,758 acres in Sonoma County,[26] was caused by PG&E’s electrical transmission lines. It was found by the Safety and Enforcement Division of the CPUC in their investigation of the 2019 Kincade Fire that PG&E violated General Order 95 Rule 31.6 regarding abandoned lines. General Order 95 dictates uniform requirements for overhead electrical line construction to ensure service and safety in the state of California, and includes provisions that apply to abandoned utility facilities.
General Order 95, Rule 31.6 states:
Lines or portions of lines permanently abandoned shall be removed by their owners so that such lines shall not become a public nuisance or a hazard to life or property. For the purposes of this rule, lines that are permanently abandoned shall be defined as those lines that are determined by their owner to have no foreseeable future use.
In response to the Kincade Fire, PG&E was required to pay $40 million fine to the General Fund of the State of California and to not seek rate recovery of capital expenditures in the amount of $85 million for the permanent removal of abandoned transmission facilities within its service territory, for a total of $125 million. Part of the agreement included PG&E developing and implementing a comprehensive plan to remove identified permanently abandoned transmission facilities within PG&E’s service territory.[27]
It has recently been stated by Edison International Chief Executive Pedro Pizarro that an idle, unconnected Southern California Edison transmission line reenergized on January 7, 2025 is a leading hypothesis for the cause of the Eaton fire in 2025.[28] These recent incidents have increased scrutiny around the rules and processes regarding abandoned utility lines in the state of California.
The Costs and Benefits of Undergrounding Utility Lines – In February 2024, researchers at the University of California, Berkeley’s Energy Institute at Haas published a report examining the cost-effectiveness, wildfire risk reduction, and impacts on reliability of various wildfire mitigation measures – including system hardening, operational measures, and vegetation management – recently deployed by PG&E.[29] They found that the deployment of fast-trip settings[30] on high-hazard days is by far the most cost-effective ignition reduction measure, but can leave an estimated 28% of ignition risk unmitigated and risk outage impacts to customers. Enhanced vegetation management (approximately $250,000 per mile) is less effective at mitigating risk, and significantly more expensive than fast-trip settings. The researchers also found that undergrounding power lines (approximately $3.7 million per mile), despite the higher investment cost of the strategy itself and the additional costs utilities receive as a rate of return on infrastructure, is more cost-effective than enhanced vegetation management, primarily because undergrounding effectively eliminates ignition risk. Yet, vegetation management comprises the largest non-fuel operations and maintenance cost for utilities today.[31]
COMMENTS:
- Author’s Statement. According to the author: “The recent wildfires revealed gaps in our state’s mitigation efforts. While the Altadena area was not officially classified as high risk, the destruction of the Eaton Fire underscores the need to expand how wildfire risk is assessed. Slow response time to firefighters during the wildfires, as reported by the media, highlights the need for better coordination with emergency services. This includes assessing PSPS to ensure decisions on power shutoffs are transparent and clearly communicated. Although undergrounding of high-risk power lines is a well-established wildfire prevention strategy, participation in the state’s program is voluntary. SB 256 strengthens California’s wildfire and emergency response policies by expanding mitigation planning to include low-risk areas, addressing past communication failures to improve future coordination, requires prioritization for undergrounding in fire affected areas and restricts costs from being passed to ratepayers.”
- Changes to the Wildfire Mitigation Plans. This bill creates new requirements for IOUs to share information related to PSPS, WMP, and emergency response planning. However, it places these requirements all within the WMP statute. As noted above, the WMP is a forward-looking document that OEIS uses to evaluate wildfire risk reduction. The WMP statute includes elements of both PSPS and emergency response efforts, with requirements for the IOUs to describe in the WMP how the WMP is consistent with these other efforts. However, this bill conflates these various planning efforts. The Joint IOUs, writing in opposition, note “commingling WMP, PSPS, and emergency preparedness requirements would increase administrative burdens and costs, complicate regulatory review, and potentially dilute the core intent…”
For instance, after the 2025 Southern California fire, Governor Gavin Newsom issued an Executive Order to expedite the rebuilding and undergrounding of electrical infrastructure in the regions of the Palisades, Eaton, Hurst, Lidia, Sunset, Woodley and Hughes Fires. In alignment, this bill includes provisions that require IOUs to consider the undergrounding of electrical distribution infrastructure after rebuilding from wildfires. But rather than including this requirement in post-event planning, it includes it within the WMP. Therefore, the committee recommends moving post-event rebuilding out of the WMP to new section of code.
- IOU and POU WMP Parity. In addition, to the new requirements for the IOUs, the bill also adds similar requirements to the POU WMPs. As currently written, some of the new requirements differ in language across IOUs and POUs provisions. The POUs have also been exempted from specific requirements. It is the goal of the committee to encourage parity across IOUs and POUs regarding PSPS, WMPs and emergency response planning, when appropriate. Therefore, the committee recommends matching the language in the POU WMP provisions to where it applies in the IOU WMP provisions, including removing the requirement for IOUs to hold an annual wildfire preparedness workshop.
- Changes to IOU equity rate base. This bill additionally includes a provision related to IOUs not earning profit on their share of fire risk mitigation capital expenditures on or after January 1, 2025. This language is mirrored in other bills before this committee. The committee recommends removing this provision to enable conforming of the multiple measures addressing this subject matter, and to add language declaring the Legislative intent of financing the decommissioning of permanently abandoned facilities and undergounding of electrical distribution infrastructure after wildfire events in ways that reduce the overall impact to ratepayers.
- Changes to the definition of permanently abandoned utility lines. The CPUC has outlined rules and practices regarding abandoned utility lines for IOUs found in General Order 95. “Lines or portions of lines permanently abandoned shall be removed by their owners so that such lines shall not become a public nuisance or a hazard to life or property. For the purposes of this rule, lines that are permanently abandoned shall be defined as those lines that are determined by their owner to have no foreseeable future use.”[32] This definition of utility lines was changed in 1995. The current bill identifies “‘permanently abandoned facilities’ to mean a facility that is out of service or where the owner cannot demonstrate, with appropriate documentation, an intent to place the facility, or portions of the facility, into service within three years.” The committee is unaware of a reason that three years is an appropriate time period to define abandoned infrastructure. Long term planning utilizing electrical infrastructure can exist on longer timelines. With increased scrutiny on abandoned and idle electrical facilities since the 2025 Southern California fires, it is likely that a better understanding and discussion of these definitions is forthcoming. Therefore, the committee recommends amending this definition to have the CPUC establish the time period that defines abandoned electrical infrastructure.
- Additional Amendments. The bill requires additional clean-up or reorganization for clarity. The committee recommends accepting all of these changes.
- Related Legislation.
AB 825 (Petrie-Norris, 2025) proposes a range of policies affecting electrical corporations, specifically measures to address rising utility bills, including a prohibition on allowing electrical corporations to include $15 billion in undergrounding capital investments in their rate base for purposes of earning equity returns; establishing a public financing mechanism to reduce costs associated with the development of eligible transmission projects; establishing a task force to review various customer demand side management programs; creating a local permitting program to provide incentives and a pool of experts to aide local agencies in siting clean energy projects; and revising wildfire mitigation planning. Status: Senate Committee on Energy, Utilities and Communication.
AB 1410 (Garcia, 2025) requires that all public utilities automatically enroll their customers in alerts for service outages and updates. Additionally requires public utilities to provide both an opt-out provision to decline alerts, with exceptions, and the ability for customers to update contact information through email and telephone. Status: Senate Committee on Energy, Utilities and Communication.
SB 292 (Cervantes, 2025) requires specified data reporting by electrical corporations, local publicly owned utilities, and electric cooperatives concerning deenergization events and reliability reports. Status: Assembly Committee on Utilities and Energy.
SB 332 (Wahab, 2025) includes various proposals, including consideration of underground of electrical infrastructure within an electrical corporation’s wildfire mitigation plan. Status: Assembly Committee on Utilities and Energy.
SB 254 (Becker, 2025) proposes various policies related to electrical corporations, including changes to: wildfire mitigation regulatory framework, the allocation to customers of the Climate Credit, electric transmission infrastructure permitting and deployment, permitting of clean energy infrastructure, including energy storage facilities, and various proposals to address electricity utility bills, including prohibiting equity rate basing by electrical corporations of $15 billion in capital investments. Status: Assembly Committee on Utilities and Energy.
SB 330 (Padilla, 2025) would authorize the Governor to establish one or more pilot projects to develop, finance, or operate electrical transmission infrastructure that meet the specified criteria, including, among other things, that the transmission line is identified by the CAISO in its transmission planning process as necessary to support clean energy generation to meet the state’s clean energy goals. Status: Assembly Committee on Utilities and Energy.
SB 769 (Caballero, 2025) would establish the Golden State Infrastructure Corporation (Corporation) within the State Treasurer’s Office as a not-for-profit corporation for the purpose of financing infrastructure projects. Status: Assembly Committee on Judiciary.
- Past Legislation.
SB 1003 (Dodd, 2024) modified timelines relevant to the submission and approval of wildfire mitigation plans (WMPs) by IOUs to the Office of Energy Infrastructure Safety and the CPUC. Requires IOUs to take into account, in their WMP, both the time required to implement an action and the amount of risk reduced for the cost and risk remaining. Status: Died – Assembly, 3rd Reading.
SB 884 (McGuire) required the CPUC to establish an expedited electric utility distribution infrastructure undergrounding program for large IOUs. Required the OEIS, followed by the CPUC, to approve or deny the plan, and required additional actions and reports. Status: Chapter 819, Statutes of 2022.
AB 2889 (Zbur, 2022) would have required IOUs to include, as part of their 2023 WMP, a multiyear undergrounding plan covering at least 7 but no more than 10 years and including methodology for identifying and prioritizing circuits for undergrounding, targets for the undergrounding work, a workforce development plan, and a description of how the undergrounding will reduce the scope and extent of above-ground activities. Status: Held – Assembly Committee on Appropriations.
SB 533 (Stern) required that an IOU’s WMP identify circuits that have frequently been de-energized to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the IOU to reduce the need for, and impact of, future de-energization of those circuits. Status: Chapter 244, Statutes of 2021.
SB 70 (Nielsen) required each IOU to additionally include a description of where and how the utility considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a specified fire threat map. Status: Chapter 400, Statutes of 2019.
AB 1054 (Holden), among other provisions, authorized IOUs to establish a memorandum account to track costs incurred to implement the WMP, and to file an application for recovery of any costs accounted in the memorandum account but not yet authorized for recovery in a GRC application. Required the CPUC to consider whether the cost of implementing each IOU’s WMP is just and reasonable in its GRC application, and to review the costs in the memorandum accounts and disallow recovery of those costs the commission deems unreasonable. Status: Chapter 79, Statutes of 2019.
AB 111 (Committee on Budget) created the OEIS within the Natural Resources Agency, under the supervision of a director appointed by the Governor, to oversee each IOU’s WMP. Status: Chapter 81, Statutes of 2019.
SB 901 (Dodd) required a more detailed list of information that a utility must provide in their WMP, including inspection and maintenance, vegetation management, system hardening, de-energization, and metrics for evaluation, among others. Status: Chapter 626, Statutes of 2018.
SB 1028 (Hill) required IOUs to file annual WMPs and required the CPUC to review and comment on those plans. Status: Chapter 598, Statutes of 2016.
- Double Referral. This bill is double referred. Upon passage in this committee, it will be referred to the Assembly Committee on Emergency Management for its review.
REGISTERED SUPPORT / OPPOSITION:
Support
Altadena Chamber of Commerce & Civic Association
Altadena Library District
Jewish Federation of the Greater San Gabriel and Pomona Valleys
Midpeninsula Regional Open Space District
Office of Los Angeles County Supervisor Lindsey P. Horvath
Santa Barbara; City of
The Climate Reality Project, Los Angeles Chapter
The Climate Reality Project, San Fernando Valley CA Chapter
Oppose
California Chamber of Commerce
North American Wood Pole Council
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison
Treated Wood Council
Western Wood Preservers Institute
Other
Southern California Public Power Authority (SCPPA)
Analysis Prepared by: Kristen Koenig / U. & E. / (916) 319-2083
AB 1054 (Holden, Chapter 79, Statutes of 2019) ↑
AB 111 (Committee on Budget, Chapter 81, Statutes of 2019) ↑
“Maximum feasible” means capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, legal, social, and technological factors. Public Utilities Code § 326 ↑
CPUC, Decision 12-04-024 April 19, 2012 ↑
CPUC, Resolution ESRB-8, Electric Safety and Reliability Branch July 12, 2018 ↑
CPUC, Decision 19-05-042, May 30, 2019 ↑
Comments of the Public Advocates Office on Southern California Edison Company’s Public Safety Power Shutoff Post-Event Report - January 2 TO 17, 2025, Rulemaking 18-12-005, March 18, 2025 ↑
CPUC, Resolution ALJ-445, October 16, 2023 ↑
CPUC, Resolution ALJ-440, June 8, 2023 ↑
CPUC, Resolution SED-12, November 7, 2024 ↑
CPUC, Decision.19-05-042, May 30, 2019 ↑
Motion of Center for Accessible Technology for order to show cause against Southern California Edison for severe notification failures during the 2023 wildfire season. Rulemaking 18-12-005, August 6, 2024 ↑
Comments of the Public Advocates Office on Southern California Edison Company’s Public Safety Power Shutoff Post-Event Report - January 2 TO 17, 2025, Rulemaking 18-12-005, March 18, 2025 ↑
Southern California Edison, January 2, 2025 to January 17, 2025, March 3, 2025 (SCE 25-1 Post-Event Data Workbook), Table 5. ↑
CPUC, Decision 19-05-042, May 30, 2019 ↑
SCE 25-1 Post-Event Data Workbook, Table 5. ↑
Comments of the Public Advocates Office on Southern California Edison Company’s Public Safety Power Shutoff Post-Event Report - January 2 TO 17, 2025, Rulemaking 18-12-005, March 18, 2025 ↑
Much of this section is taken from the CPUC’s 2024 SB 695 Report, starting on pg. 47 ↑
2019 to Q4 2023; pg. 49, CPUC; 2024 Senate Bill 695 Report; July 2024; https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/office-of-governmental-affairs-division/reports/2024/2024-sb-695-report.pdf ↑
Pg. 50, Table 6; CPUC; 2024 Senate Bill 695 Report; July 2024; https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/office-of-governmental-affairs-division/reports/2024/2024-sb-695-report.pdf ↑
PG&E, SCE, and SDG&E ↑
“system costs” means revenue requirement ↑
Pg. 52; Ibid. ↑
Table 8, pg. 53; Ibid. ↑
Finding of Fact 2 of each CPUC Financing Order states the estimated Net Present Value (NPV) savings of each bond issuance authorized. D.20-11-007: $173 million; D.21-06-030: $633 million; D.21-10-025: $403 million; D.22-08-004: $659 million; D.23- 02-023: $493 million; D.24-02-011: $465 million. The CPUC also approved SDG&E AL 4078-E that demonstrated $84.3 million NPV savings. ↑
Sonoma Operational Area dn the County of Conoma Department of Emergency Management, “2019 Kincade Fire After Action Report” March 2020 ↑
CPUC, Resolution SED-6, 2021 ↑
Henandez Salvador “Edison Says dormant powerline is a leading theory for cause of Eaton fire, Los Angeles Times, April 12, 2025 ↑
Energy Institute at Haas, UC Berkeley; “Risk-Cost Tradeoffs in Power Sector Wildfire Prevention”; February 2024. ↑
Fast trip settings increase the sensitivity of protective devices and equipment that trigger automatic power line outages when a fault is detected. ↑
T&D World; “How Risk-Based Vegetation Management Program Slashes Costs”; January 2023; https://www.tdworld.com/vegetation-management/article/21258571/how-risk-based-vegetation-management-program-slashes-costs ↑
CPUC, California Code, General Order 95, Rule 31.6 ↑
Date of Hearing: June 25, 2025
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
SBPCA Bill Id:SB 256
Author:(Pérez) – As Amended Ver:June 16, 2025
SENATE VOTE: 30-8
SUBJECT: Electricity: electrical infrastructure: wildfire mitigation
SUMMARY: Requires a number of additional provisions included in the wildfire mitigation plans provided by the Investor-Owned Utilities (IOUs) and the Public-Owned Utilities (POUs), and electrical cooperatives. The bill also requires the removal of abandoned electrical facilities, prohibits IOUs from including wildfire mitigation related capital expenditures from being included in its equity rate base, as well as requires coordination efforts between utilities and local emergency response agencies.
Specifically, this bill:
- Adds specific provisions that must be included in the Wildfire Mitigation Plans (WMPs) provided by Investor-Owned Utilities (IOUs). These include:
- Requiring IOUs to consider in their deenergization protocols:
- Residents within a household who are not the customer of record to subscribe to receive deenergization notifications.
- Communication with public safety partners.
- Requiring the identification of any lapses in communication coordination during emergency response events with local governments and a description of opportunities to establish more efficient communication coordination
- Considering undergrounding distribution infrastructure when rebuilding if it is determined to be cost effective compared to other wildfire mitigation strategies.
- Conduct an annual wildfire preparedness workshop in collaboration with any local fire department to review and gain feedback about wildfire protocols, mitigation plans and past events.
- Requiring IOUs to consider in their deenergization protocols:
- Mandates the California Public Utilities Commission (CPUC) to require the IOUs to exclude their share of fire risk mitigation capital expenditures in their equity rate bases, as specified, for expenditures authorized by the CPUC on or after January 1, 2025.
- Adds a requirement to the WMPs provided by POUs and electrical cooperatives to include a description of processes by which the POU or coop coordinates communication with local governments in their service area, both prior to and during a wildfire-related emergency.
- IOUs and POUS that have overlapping service areas with the boundaries of a regional emergency operations center will establish coordination procedures, including assigning a representative who will complete appropriate training.
- Requires the CPUC to mandate IOUs to remove all permanently abandoned facilities in order to prevent public nuisances or hazards to life or property and ensure all applicable safety requirements apply to these facilities until removed.
EXISTING LAW:
- Establishes and vests the CPUC with regulatory authority over public utilities, including electric IOUs. Authorizes the CPUC to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. (Article XII of the California Constitution and Public Utilities Code § 451)
- Authorizes the CPUC to supervise and regulate every public utility in the state (Public Utilities Code § 701)
- Establishes the Office of Energy Infrastructure Safety (OEIS) within the Natural Resources Agency, which, as of July 1, 2021, subsumed the Wildfire Safety Division (WSD) responsibilities at the CPUC, including to review the Wildfire Mitigation Plans of IOUs. (Government Code §§ 15740 et seq. and 15475.6, Public Utilities Code §§ 326 and 8385)
- Establishes the Underground Safety Board within Energy Safety to coordinate education and outreach activities that encourage safe excavation practices, along with developing standards and investigating violations, as specified. (Government Code § 4216.12)
- Authorizes the California Consumer Power and Conservation Financing Authority (CPA) to establish, finance, purchase, lease, own, operate, or construct generating facilities and other energy-related projects to supplement California's power supply. (Public Utilities Code § 3310)
- Permits the California Public Utilities Commission (CPUC) to allow for the recovery of costs and expenses arising from a covered wildfire occurring after January 1, 2019, if the CPUC finds the costs and expenses just and reasonable (Public Utilities Code § 451.1)
- Authorizes an IOU to request the CPUC issue a financing order to authorize the recovery, through securitization, of costs and expenses related to a catastrophic wildfire (with an ignition date in 2017 or after January 1, 2019) or undercollection amounts accrued in 2020. (Public Utilities Code § 850)
- Authorizes an IOU to request securitization to finance its share of the first $5 billion of approved wildfire mitigation capital expenditures and the debt financing costs of those expenditures. Prohibits the CPUC from allowing the large IOUs to earn a return on equity on the mandated fire risk mitigation capital expenditures. (Public Utilities Code § 8386.3)
- Requires the CPUC to create an expedited program for undergrounding utility distribution infrastructure to reduce wildfire risk. Only large electrical corporations can participate. To join, a utility must submit a detailed 10-year undergrounding plan to the Office of Energy Infrastructure Safety, prioritizing projects in high fire-risk areas and justifying undergrounding over other mitigation methods. If Energy Safety approves the plan, the IOU must then seek the CPUC’s conditional approval of the plan’s costs and targets. Once approved, the utility must regularly report progress, hire an independent monitor to oversee compliance, and apply for external funding to offset costs to ratepayers. The office and CPUC have the authority to require corrections or impose penalties if the utility fails to meet its plan objectives. (Public Utilities Code § 8388.5)
- Requires each IOU to annually prepare and submit to Energy Safety a WMP for review and approval. Requires the WMP to include a description of preventative strategies and programs to minimize the risk of catastrophic wildfire, including consideration of dynamic climate change risk; a description of the metrics used to evaluate the plan’s performance and underlying assumptions for the use of those metrics; and a list that identifies, describes, and prioritizes all wildfire risks and drivers of those risks throughout the IOU’s service territory. (Public Utilities Code § 8386)
- Requires an electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. Requires each electrical corporation to annually prepare a wildfire mitigation plan (WMP) and to submit the plan to the Wildfire Safety Division, and, as of July 1, 2021, to the OEIS, for review and approval. (Public Utilities Code § 8386)
- Requires a WMP of an electrical corporation to include, among other things, protocols for de-energizing portions of the electrical distribution system that consider the associated impacts on public safety, and protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communications infrastructure, and notifications to affected customers. (Public Utilities Code §§ 8386)
FISCAL EFFECT: Unknown. This bill is keyed fiscal and will be referred to the Assembly Committee on Appropriations for its review. According to the Senate Appropriations Committee, an earlier version of this measure resulted in approximately $562,980 annually to OEIS, and about $474,000 annually to the CPUC to implement. This bill has since been amended to include new requirements on the CPUC, which may impact these values.
CONSUMER COST IMPACTS: Unknown.
BACKGROUND:
Wildfire Mitigation Plans – Wildfire Mitigation Plans were initiated by the enactment of SB 1028 (Hill, Chapter 598, Statutes of 2016). These original Wildfire Mitigation Plans included, among other provisions, a description of preventative strategies and programs that can minimize risk of catastrophic wildfires. They were approved by the CPUC in June 2019 through the rulemaking process. Later in 2019, the Legislature revised the scope of the WMP to cover at least a three-year period[1] and divided oversight of the plans between OEIS (originally the Wildfire Safety Division housed under the CPUC) and the CPUC.[2] OEIS is tasked with assessing safety; they evaluate if proposed actions in the WMP achieve the maximum feasible wildfire risk reduction.[3] The CPUC is then tasked with reviewing cost; they evaluate if the cost of implementing each mitigation effort in the WMP is just and reasonable for purposes of cost recovery. The CPUC also has enforcement authority with regard to an IOU’s progress and performance on their WMPs.
De-energization Notification Protocols Implemented by the CPUC – Starting in 2012, the CPUC released protocols for utilities to follow during de-energization events. The first Public Safety Power Shutoff (PSPS) guidance released by the CPUC was specifically for SDG&E and required notification of customers.[4] In 2018, the CPUC adopted Resolution ESRB-8, which extended the requirements of the 2012 guidance for SDG&E to all electric investor-owned utilities (IOUs).[5] Among other provisions, the resolution required customer notifications prior to a de-energization event, and required notification to the Safety and Enforcement Division once the de-energization decision is made, and within 30 minutes after the last service is restored.
In 2019, the CPUC implemented Phase 1 PSPS notification guidelines.[6] The Commission stated that electric IOUs should, whenever possible, adhere to the following minimum notification timeline:
- 48-72 hours in advance of anticipated de-energization: notification of public safety partners priority notification entities
- 24-48 hours in advance of anticipated de-energization: notification of all other affected customers
- 1-4 hours in advance of anticipated de-energization, if possible: notification of all affected customers
- When de-energization is initiated: notification of all affected customers.
- Immediately before re-energization begins: notification of all affected customers.
- When re-energization is complete: notification of all affected customers.
In 2020, Phase 2 guidelines directed electric IOUs to provide enhanced customer-friendly communication during all phases of a PSPS event, minimize the impact on customers, and increase accountability with regional Working Groups and in reports. In 2021, Phase 3 guidelines were implemented and are ongoing. They require IUOs to take a results-based approach to improve notification and mitigate the impacts of PSPS events.
History of IOU Emergency De-energization Notification Problems –
Year | PG&E | SCE | SDG&E |
2022 | 4,198 | 34,171 | 0 |
2023 | 4,738 | 82,212 | 0 |
2024 | 11,685 | 76,767 | 6,330 |
2025 | 657 | 385,588 | 12,266 |
Table 1 shows the total notification failures accumulated by PG&E, SCE, and SDG&E from 2022 to 2025 during PSPS events.[7] |
As outlined in the protocols above, IOUs are required to send notifications to customers on a specified schedule prior to the expected de-energization and until re-energization. These notifications are intended to give customers adequate warning to prepare in advance for a proactive de-energization, which the IOUs perform as a last resort when weather conditions could result in a devastating wildfire. Timely notification allows customers to prepare for potential outages and make necessary arrangements based on the information provided.
There has been a history of problems with PSPS notification systems across the IOUs since the initiation of these protocols. In 2021, the CPUC fined Pacific Gas & Electric (PG&E) $106 million for violating guidelines during PSPS events in the Fall of 2019. These violations included failures notifying many customers and public safety partners. In 2023, PG&E was fined $8 million as a result of failing to notify any of its impacted customers during its 2020 PSPS events.[8] These failures are not limited to PG&E. In 2020, Southern California Edison (SCE) initiated sixteen PSPS events and failed to notify 25,573 customers, resulting in a $7 million fine.[9] This was followed by twelve PSPS events initiated by SCE in 2021, during which SCE failed to send 232,719 notifications.[10] Table 1 shows the recent notification failures accumulated by PG&E, SCE, and San Diego Gas & Electric (SDG&E) during PSPS events. Table 1 shows SCE has consistently had an increasing number of notification failures over the years, compared to PG&E and SDG&E. These trends are made clear in Figure 1 below, which shows the percentage of customers that PG&E, SCE, and SDG&E de-energized without 24-48 hour advance notifications, for each event since 2022. As shown in the Figure 1, SCE has had more severe notification failures – where high percentages of impacted customers never received a notice – than the other utilities.
According to the Public Advocates Office, in the 2023-2024 season, starting in October, SCE failed to meet customer notification requirements for as much as 79% of customers.[11] In addition to the many fines implemented, many corrective actions have been required by all IOUs as a result of failed PSPS guideline compliance. The Center for Accessible Technology has suggested that few corrective actions have been effective at improving issues with SCE’s notification systems.[12]
Figure 1: Percentage of de-energized customers who did not receive 24-48 hour advance notification for each IOU, for each PSPS event, from 2022 through January 2025[13] |
PSPS during the Southern California Fires of 2025 – On January 2, 2025, SCE initiated a PSPS event and de-energized 363,196 customer accounts.[14] These accounts include 11,740 Medical Baseline customer accounts, 90,632 Access and Functional Needs customer accounts, and 6,800 critical facilities accounts.[15] Fifteen days later, in the afternoon of January 17, 2025, SCE restored power to all customers.[16] According to the Public Advocates Office, during the Southern California fires in 2025, SCE failed to send 307,211 required notifications to Public Safety Partners, Critical Facilities and Infrastructure, and customers.[17] Cal Advocates found that the events in 2025 continued a pattern of failure of SCE to provide its customers with advance notification prior to de-energization.
Wildfire Spending[18] – Over the last five years,[19] $16 billion of wildfire mitigation costs have been authorized to be collected from customers, in addition to approximately $11 billion for wildfire insurance premiums and catastrophic event costs.[20] Collectively, these “wildfire-related” costs resulted in over $5 billion per year over the last 5 years, when averaged amongst the three largest IOUs.[21] These wildfire-related costs have amounted to roughly 18% of overall system costs[22] for PG&E, 12% for SCE, and 9% for SDG&E,[23] as of 2023. For residential customers, these wildfire-related costs have led to a monthly $24 increase on the average 2023 bill for PG&E, a $18 increase for SCE, and a $13 increase for SDG&E; comprising between 7-12% of total monthly bills.[24]
While wildfire-related operating expenses, such as vegetation management and liability insurance coverage, make up the majority of these recent cost increases, wildfire-related capital expenses are anticipated to grow in time. Capital-related expenses, such as installing covered conductors or undergrounding portions of a distribution system, have a larger cumulative impact on rates relative to operating expenses, as capital costs are recovered over a much longer time horizon during which the IOUs also earn an authorized profit.
Ratepayers have been shielded from some of the cost impacts of these capital expenses due to two provisions of AB 1054 (Holden, Chapter 79, Statutes of 2019): 1) the first $5 billion of capital spending is excluded from earning a Return on Equity (i.e. shareholder profit); and 2) the first $5 billion of capital spending may also be securitized through a CPUC financing order rather than through more traditional unsecured bond offerings. The equity rate base exclusion of #1 is estimated to save ratepayers as much as $2 billion over the life of those capital assets.[25] The securitization of #2 benefits ratepayers by allowing the IOUs to finance wildfire-related capital projects with lower interest rates than would otherwise be available.
Risks and Rules Regarding Permanently Abandoned Utility Lines – The risk posed by abandoned electrical utility lines includes injury, such as electrocution, and wildfire, among others. In July of 2020, it was determined by CAL FIRE that the 2019 Kincade Fire, which burned 77,758 acres in Sonoma County,[26] was caused by PG&E’s electrical transmission lines. It was found by the Safety and Enforcement Division of the CPUC in their investigation of the 2019 Kincade Fire that PG&E violated General Order 95 Rule 31.6 regarding abandoned lines. General Order 95 dictates uniform requirements for overhead electrical line construction to ensure service and safety in the state of California, and includes provisions that apply to abandoned utility facilities.
General Order 95, Rule 31.6 states:
Lines or portions of lines permanently abandoned shall be removed by their owners so that such lines shall not become a public nuisance or a hazard to life or property. For the purposes of this rule, lines that are permanently abandoned shall be defined as those lines that are determined by their owner to have no foreseeable future use.
In response to the Kincade Fire, PG&E was required to pay $40 million fine to the General Fund of the State of California and to not seek rate recovery of capital expenditures in the amount of $85 million for the permanent removal of abandoned transmission facilities within its service territory, for a total of $125 million. Part of the agreement included PG&E developing and implementing a comprehensive plan to remove identified permanently abandoned transmission facilities within PG&E’s service territory.[27]
It has recently been stated by Edison International Chief Executive Pedro Pizarro that an idle, unconnected Southern California Edison transmission line reenergized on January 7, 2025 is a leading hypothesis for the cause of the Eaton fire in 2025.[28] These recent incidents have increased scrutiny around the rules and processes regarding abandoned utility lines in the state of California.
The Costs and Benefits of Undergrounding Utility Lines – In February 2024, researchers at the University of California, Berkeley’s Energy Institute at Haas published a report examining the cost-effectiveness, wildfire risk reduction, and impacts on reliability of various wildfire mitigation measures – including system hardening, operational measures, and vegetation management – recently deployed by PG&E.[29] They found that the deployment of fast-trip settings[30] on high-hazard days is by far the most cost-effective ignition reduction measure, but can leave an estimated 28% of ignition risk unmitigated and risk outage impacts to customers. Enhanced vegetation management (approximately $250,000 per mile) is less effective at mitigating risk, and significantly more expensive than fast-trip settings. The researchers also found that undergrounding power lines (approximately $3.7 million per mile), despite the higher investment cost of the strategy itself and the additional costs utilities receive as a rate of return on infrastructure, is more cost-effective than enhanced vegetation management, primarily because undergrounding effectively eliminates ignition risk. Yet, vegetation management comprises the largest non-fuel operations and maintenance cost for utilities today.[31]
COMMENTS:
- Author’s Statement. According to the author: “The recent wildfires revealed gaps in our state’s mitigation efforts. While the Altadena area was not officially classified as high risk, the destruction of the Eaton Fire underscores the need to expand how wildfire risk is assessed. Slow response time to firefighters during the wildfires, as reported by the media, highlights the need for better coordination with emergency services. This includes assessing PSPS to ensure decisions on power shutoffs are transparent and clearly communicated. Although undergrounding of high-risk power lines is a well-established wildfire prevention strategy, participation in the state’s program is voluntary. SB 256 strengthens California’s wildfire and emergency response policies by expanding mitigation planning to include low-risk areas, addressing past communication failures to improve future coordination, requires prioritization for undergrounding in fire affected areas and restricts costs from being passed to ratepayers.”
- Changes to the Wildfire Mitigation Plans. This bill creates new requirements for IOUs to share information related to PSPS, WMP, and emergency response planning. However, it places these requirements all within the WMP statute. As noted above, the WMP is a forward-looking document that OEIS uses to evaluate wildfire risk reduction. The WMP statute includes elements of both PSPS and emergency response efforts, with requirements for the IOUs to describe in the WMP how the WMP is consistent with these other efforts. However, this bill conflates these various planning efforts. The Joint IOUs, writing in opposition, note “commingling WMP, PSPS, and emergency preparedness requirements would increase administrative burdens and costs, complicate regulatory review, and potentially dilute the core intent…”
For instance, after the 2025 Southern California fire, Governor Gavin Newsom issued an Executive Order to expedite the rebuilding and undergrounding of electrical infrastructure in the regions of the Palisades, Eaton, Hurst, Lidia, Sunset, Woodley and Hughes Fires. In alignment, this bill includes provisions that require IOUs to consider the undergrounding of electrical distribution infrastructure after rebuilding from wildfires. But rather than including this requirement in post-event planning, it includes it within the WMP. Therefore, the committee recommends moving post-event rebuilding out of the WMP to new section of code.
- IOU and POU WMP Parity. In addition, to the new requirements for the IOUs, the bill also adds similar requirements to the POU WMPs. As currently written, some of the new requirements differ in language across IOUs and POUs provisions. The POUs have also been exempted from specific requirements. It is the goal of the committee to encourage parity across IOUs and POUs regarding PSPS, WMPs and emergency response planning, when appropriate. Therefore, the committee recommends matching the language in the POU WMP provisions to where it applies in the IOU WMP provisions, including removing the requirement for IOUs to hold an annual wildfire preparedness workshop.
- Changes to IOU equity rate base. This bill additionally includes a provision related to IOUs not earning profit on their share of fire risk mitigation capital expenditures on or after January 1, 2025. This language is mirrored in other bills before this committee. The committee recommends removing this provision to enable conforming of the multiple measures addressing this subject matter, and to add language declaring the Legislative intent of financing the decommissioning of permanently abandoned facilities and undergounding of electrical distribution infrastructure after wildfire events in ways that reduce the overall impact to ratepayers.
- Changes to the definition of permanently abandoned utility lines. The CPUC has outlined rules and practices regarding abandoned utility lines for IOUs found in General Order 95. “Lines or portions of lines permanently abandoned shall be removed by their owners so that such lines shall not become a public nuisance or a hazard to life or property. For the purposes of this rule, lines that are permanently abandoned shall be defined as those lines that are determined by their owner to have no foreseeable future use.”[32] This definition of utility lines was changed in 1995. The current bill identifies “‘permanently abandoned facilities’ to mean a facility that is out of service or where the owner cannot demonstrate, with appropriate documentation, an intent to place the facility, or portions of the facility, into service within three years.” The committee is unaware of a reason that three years is an appropriate time period to define abandoned infrastructure. Long term planning utilizing electrical infrastructure can exist on longer timelines. With increased scrutiny on abandoned and idle electrical facilities since the 2025 Southern California fires, it is likely that a better understanding and discussion of these definitions is forthcoming. Therefore, the committee recommends amending this definition to have the CPUC establish the time period that defines abandoned electrical infrastructure.
- Additional Amendments. The bill requires additional clean-up or reorganization for clarity. The committee recommends accepting all of these changes.
- Related Legislation.
AB 825 (Petrie-Norris, 2025) proposes a range of policies affecting electrical corporations, specifically measures to address rising utility bills, including a prohibition on allowing electrical corporations to include $15 billion in undergrounding capital investments in their rate base for purposes of earning equity returns; establishing a public financing mechanism to reduce costs associated with the development of eligible transmission projects; establishing a task force to review various customer demand side management programs; creating a local permitting program to provide incentives and a pool of experts to aide local agencies in siting clean energy projects; and revising wildfire mitigation planning. Status: Senate Committee on Energy, Utilities and Communication.
AB 1410 (Garcia, 2025) requires that all public utilities automatically enroll their customers in alerts for service outages and updates. Additionally requires public utilities to provide both an opt-out provision to decline alerts, with exceptions, and the ability for customers to update contact information through email and telephone. Status: Senate Committee on Energy, Utilities and Communication.
SB 292 (Cervantes, 2025) requires specified data reporting by electrical corporations, local publicly owned utilities, and electric cooperatives concerning deenergization events and reliability reports. Status: Assembly Committee on Utilities and Energy.
SB 332 (Wahab, 2025) includes various proposals, including consideration of underground of electrical infrastructure within an electrical corporation’s wildfire mitigation plan. Status: Assembly Committee on Utilities and Energy.
SB 254 (Becker, 2025) proposes various policies related to electrical corporations, including changes to: wildfire mitigation regulatory framework, the allocation to customers of the Climate Credit, electric transmission infrastructure permitting and deployment, permitting of clean energy infrastructure, including energy storage facilities, and various proposals to address electricity utility bills, including prohibiting equity rate basing by electrical corporations of $15 billion in capital investments. Status: Assembly Committee on Utilities and Energy.
SB 330 (Padilla, 2025) would authorize the Governor to establish one or more pilot projects to develop, finance, or operate electrical transmission infrastructure that meet the specified criteria, including, among other things, that the transmission line is identified by the CAISO in its transmission planning process as necessary to support clean energy generation to meet the state’s clean energy goals. Status: Assembly Committee on Utilities and Energy.
SB 769 (Caballero, 2025) would establish the Golden State Infrastructure Corporation (Corporation) within the State Treasurer’s Office as a not-for-profit corporation for the purpose of financing infrastructure projects. Status: Assembly Committee on Judiciary.
- Past Legislation.
SB 1003 (Dodd, 2024) modified timelines relevant to the submission and approval of wildfire mitigation plans (WMPs) by IOUs to the Office of Energy Infrastructure Safety and the CPUC. Requires IOUs to take into account, in their WMP, both the time required to implement an action and the amount of risk reduced for the cost and risk remaining. Status: Died – Assembly, 3rd Reading.
SB 884 (McGuire) required the CPUC to establish an expedited electric utility distribution infrastructure undergrounding program for large IOUs. Required the OEIS, followed by the CPUC, to approve or deny the plan, and required additional actions and reports. Status: Chapter 819, Statutes of 2022.
AB 2889 (Zbur, 2022) would have required IOUs to include, as part of their 2023 WMP, a multiyear undergrounding plan covering at least 7 but no more than 10 years and including methodology for identifying and prioritizing circuits for undergrounding, targets for the undergrounding work, a workforce development plan, and a description of how the undergrounding will reduce the scope and extent of above-ground activities. Status: Held – Assembly Committee on Appropriations.
SB 533 (Stern) required that an IOU’s WMP identify circuits that have frequently been de-energized to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the IOU to reduce the need for, and impact of, future de-energization of those circuits. Status: Chapter 244, Statutes of 2021.
SB 70 (Nielsen) required each IOU to additionally include a description of where and how the utility considered undergrounding electrical distribution lines within those areas of its service territory identified to have the highest wildfire risk in a specified fire threat map. Status: Chapter 400, Statutes of 2019.
AB 1054 (Holden), among other provisions, authorized IOUs to establish a memorandum account to track costs incurred to implement the WMP, and to file an application for recovery of any costs accounted in the memorandum account but not yet authorized for recovery in a GRC application. Required the CPUC to consider whether the cost of implementing each IOU’s WMP is just and reasonable in its GRC application, and to review the costs in the memorandum accounts and disallow recovery of those costs the commission deems unreasonable. Status: Chapter 79, Statutes of 2019.
AB 111 (Committee on Budget) created the OEIS within the Natural Resources Agency, under the supervision of a director appointed by the Governor, to oversee each IOU’s WMP. Status: Chapter 81, Statutes of 2019.
SB 901 (Dodd) required a more detailed list of information that a utility must provide in their WMP, including inspection and maintenance, vegetation management, system hardening, de-energization, and metrics for evaluation, among others. Status: Chapter 626, Statutes of 2018.
SB 1028 (Hill) required IOUs to file annual WMPs and required the CPUC to review and comment on those plans. Status: Chapter 598, Statutes of 2016.
- Double Referral. This bill is double referred. Upon passage in this committee, it will be referred to the Assembly Committee on Emergency Management for its review.
REGISTERED SUPPORT / OPPOSITION:
Support
Altadena Chamber of Commerce & Civic Association
Altadena Library District
Jewish Federation of the Greater San Gabriel and Pomona Valleys
Midpeninsula Regional Open Space District
Office of Los Angeles County Supervisor Lindsey P. Horvath
Santa Barbara; City of
The Climate Reality Project, Los Angeles Chapter
The Climate Reality Project, San Fernando Valley CA Chapter
Oppose
California Chamber of Commerce
North American Wood Pole Council
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison
Treated Wood Council
Western Wood Preservers Institute
Other
Southern California Public Power Authority (SCPPA)
Analysis Prepared by: Kristen Koenig / U. & E. / (916) 319-2083
AB 1054 (Holden, Chapter 79, Statutes of 2019) ↑
AB 111 (Committee on Budget, Chapter 81, Statutes of 2019) ↑
“Maximum feasible” means capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, legal, social, and technological factors. Public Utilities Code § 326 ↑
CPUC, Decision 12-04-024 April 19, 2012 ↑
CPUC, Resolution ESRB-8, Electric Safety and Reliability Branch July 12, 2018 ↑
CPUC, Decision 19-05-042, May 30, 2019 ↑
Comments of the Public Advocates Office on Southern California Edison Company’s Public Safety Power Shutoff Post-Event Report - January 2 TO 17, 2025, Rulemaking 18-12-005, March 18, 2025 ↑
CPUC, Resolution ALJ-445, October 16, 2023 ↑
CPUC, Resolution ALJ-440, June 8, 2023 ↑
CPUC, Resolution SED-12, November 7, 2024 ↑
CPUC, Decision.19-05-042, May 30, 2019 ↑
Motion of Center for Accessible Technology for order to show cause against Southern California Edison for severe notification failures during the 2023 wildfire season. Rulemaking 18-12-005, August 6, 2024 ↑
Comments of the Public Advocates Office on Southern California Edison Company’s Public Safety Power Shutoff Post-Event Report - January 2 TO 17, 2025, Rulemaking 18-12-005, March 18, 2025 ↑
Southern California Edison, January 2, 2025 to January 17, 2025, March 3, 2025 (SCE 25-1 Post-Event Data Workbook), Table 5. ↑
CPUC, Decision 19-05-042, May 30, 2019 ↑
SCE 25-1 Post-Event Data Workbook, Table 5. ↑
Comments of the Public Advocates Office on Southern California Edison Company’s Public Safety Power Shutoff Post-Event Report - January 2 TO 17, 2025, Rulemaking 18-12-005, March 18, 2025 ↑
Much of this section is taken from the CPUC’s 2024 SB 695 Report, starting on pg. 47 ↑
2019 to Q4 2023; pg. 49, CPUC; 2024 Senate Bill 695 Report; July 2024; https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/office-of-governmental-affairs-division/reports/2024/2024-sb-695-report.pdf ↑
Pg. 50, Table 6; CPUC; 2024 Senate Bill 695 Report; July 2024; https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/office-of-governmental-affairs-division/reports/2024/2024-sb-695-report.pdf ↑
PG&E, SCE, and SDG&E ↑
“system costs” means revenue requirement ↑
Pg. 52; Ibid. ↑
Table 8, pg. 53; Ibid. ↑
Finding of Fact 2 of each CPUC Financing Order states the estimated Net Present Value (NPV) savings of each bond issuance authorized. D.20-11-007: $173 million; D.21-06-030: $633 million; D.21-10-025: $403 million; D.22-08-004: $659 million; D.23- 02-023: $493 million; D.24-02-011: $465 million. The CPUC also approved SDG&E AL 4078-E that demonstrated $84.3 million NPV savings. ↑
Sonoma Operational Area dn the County of Conoma Department of Emergency Management, “2019 Kincade Fire After Action Report” March 2020 ↑
CPUC, Resolution SED-6, 2021 ↑
Henandez Salvador “Edison Says dormant powerline is a leading theory for cause of Eaton fire, Los Angeles Times, April 12, 2025 ↑
Energy Institute at Haas, UC Berkeley; “Risk-Cost Tradeoffs in Power Sector Wildfire Prevention”; February 2024. ↑
Fast trip settings increase the sensitivity of protective devices and equipment that trigger automatic power line outages when a fault is detected. ↑
T&D World; “How Risk-Based Vegetation Management Program Slashes Costs”; January 2023; https://www.tdworld.com/vegetation-management/article/21258571/how-risk-based-vegetation-management-program-slashes-costs ↑
CPUC, California Code, General Order 95, Rule 31.6 ↑
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 256 |
THIRD READING
Bill No: SB 256
Author: Pérez (D)
Amended: 5/5/25
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 14-2, 4/29/25
AYES: Becker, Ochoa Bogh, Allen, Archuleta, Arreguín, Ashby, Caballero, Gonzalez, Hurtado, Limón, McNerney, Rubio, Stern, Wahab
NOES: Dahle, Strickland
NO VOTE RECORDED: Grove
SENATE APPROPRIATIONS COMMITTEE: 5-1, 5/23/25
AYES: Caballero, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto
NO VOTE RECORDED: Dahle
SUBJECT: Electricity: electrical infrastructure: wildfire mitigation: emergency operations
SOURCE: Author
DIGEST:
This bill (1) includes various provisions related to wildfire mitigation by electrical corporations, including notifications regarding deenergization events and the consideration of conversion of undergrounding of overhead electrical distribution utility infrastructure for areas affected by wildfires. This bill also (2) prohibits large electrical corporations to include in their equity rate base an additional unspecified amount for fire risk mitigation capital expenditures approved after January 1, 2025.
ANALYSIS:
Existing law:
- Establishes the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Establishes the Office of Energy Infrastructure Safety (OEIS) is the successor to, and, effective July 1, 2021, is vested with, all of the duties, powers, and responsibilities of the Wildfire Safety Division within the CPUC established pursuant to Section 326 of the Public Utilities Code, including, but not limited to, the power to compel information and conduct investigations. (Government Code §15475)
- Requires every public utility to furnish and maintain adequate, efficient, just, and reasonable service, instrumentalities, equipment, and facilities, as are necessary to promote the safety, health, comfort, and convenience of its patrons, employees, and the public. (Public Utilities Code §451)
- Establishes the policy of the state that each electrical corporation is required to operate its electric distribution grid in its service territory in a safe, reliable, efficient, and cost-effective manner. (Public Utilities Code §399.2(a))
- Authorizes the CPUC to supervise and regulate every public utility in the state and to do all things necessary and convenient in the exercise of such power and jurisdiction. (Public Utilities Code §701)
- Requires an electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. Requires each electrical corporation to annually prepare a wildfire mitigation plan (WMP) and to submit the plan to the Wildfire Safety Division, and, as of July 1, 2021, to the OEIS, for review and approval. (Public Utilities Code §8386)
- Requires a WMP of an electrical corporation to include, among other things, protocols for de-energizing portions of the electrical distribution system that consider the associated impacts on public safety, and protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communications infrastructure, and notifications to affected customers. (Public Utilities Code §§8386)
- Prohibits the CPUC from allowing a large electrical corporation to include in its equity rate base its share of the first $5 billion expended in aggregate by large electrical corporations on fire risk mitigation capital expenditures included in the electrical corporations’ WMPs, as provided. (Public Utilities Code § 8386.3(e))
- Establishes the Office of Emergency Services (OES), under the California Emergency Services Act, within the office of the Governor and under the supervision of the Director of Emergency Services. Makes OES responsible for addressing natural, technological, or man-made disasters and emergencies, including activities necessary to prevent, respond to, recover from, and mitigate the effects of emergencies and disasters to people and property. Existing law requires OES to establish a standardized emergency management system for use by all emergency response agencies. (Government Code §8585 et seq.)
This bill:
- Requires electrical corporations, electrical cooperatives, and local electric publicly owned utilities (POUs) to include consideration of areas adjacent to high fire threat areas within their WMP for the description of the preventative strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires.
- Requires, within the WMP, the protocols for disabling re-closers and de-energizing portions of the electrical distribution system to consider the impacts on the opportunity for residents within a household who are not the customer of record to subscribe to receive notifications related to de-energization events and communication with public safety partners that have the ability to coordinate with electrical corporations to provide broader messaging to affected communities.
- Requires a WMP to include an identification of any lapses in communication coordination during recent past emergency response events with local governments, as specified, and a description of any opportunities to collaborate with local governments, and other steps that can be taken to establish more efficient communication coordination during future emergency responses, as provided.
- Requires that an electrical corporation’s WMP include, for areas affected by wildfires that require electrical distribution infrastructure to be rebuilt by an electrical corporation, consideration of undergrounding distribution infrastructure if it is determined to be cost effective compared to other wildfire mitigation strategies.
- Requires electrical corporations, electrical cooperatives, and local electric POUs to conduct annual wildfire preparedness workshops in collaboration with, and open to, any local fire departments in their service areas to provide updates on the latest adopted WMPs, discuss any lapses in, and opportunities to increase efficiency of, communication coordination during emergency responses, and gather input for inclusion in the development of the next annual submission of their wildfire mitigation plans, as provided.
- Prohibits the CPUC from allowing a large electrical corporation to additionally include in its equity rate base its share of the amount specified by subdivision (e) of Section 8386.3, that the large electrical corporations collectively first expend on fire risk mitigation capital expenditures approved by the CPUC on or after January 1, 2025. [This is a reference to any related provisions that may be adopted by the Legislature, including those proposed in SB 254 (Becker, 2025).]
- Requires all electrical corporations and local electric POUs that have service areas that overlap with the boundaries of a state regional emergency operations center, in cooperation with OES, and other emergency service agencies, to establish procedures for the coordination of efforts between electrical corporations and local electric POUs and their representatives and those of emergency response agencies. Requires these electrical corporations and local electric POUs to assign a representative to work within each state regional operations center that has boundaries that overlap with the electrical corporation’s or local electric POU’s service area. Requires the representative to complete the appropriate Standardized Emergency Management System training.
Background
Wildfire Mitigation Plan. As a result of SB 1028 (Hill, Chapter 598, Statutes of 2016), and further expanded by SB 901 (Dodd, Chapter 626, Statutes of 2018) and AB 1054 (Holden, Chapter 79, Statutes of 2019), electric investor-owned utilities (IOUs) are required to file WMPs with guidance by OEIS (as of 2021). OEIS reviews and determines whether to approve these plans and ensures compliance with guidance and statute. The electric IOUs’ WMPs detail, describe and summarize electric IOU responsibilities, actions, and resources to mitigate wildfires, especially in the high-fire threat districts. These actions include plans to harden their system to prevent wildfire ignitions caused by utility infrastructure, such as widespread electric line replacement with covered conductors designed to lower wildfire ignition, pole replacement, and other actions. The plans also include information regarding the electric IOUs’ efforts to conduct extensive vegetation management to reduce the risk of tree branches, grasses, and other vegetation from coming into contact with utility infrastructure. The WMPs also require electric utilities to incorporate their protocols and procedures for proactive power shutoffs as required by CPUC rules.
De-energization events. In recent years, California has experienced a number of catastrophic wildfires, including several ignited by electrical utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Risks for wildfires also increased with extended drought and bark beetle infestation that has increased tree mortalities and, as a result, increased the fuel, and risk for wildfires. As a result, electrical corporations have increasingly utilized proactive power shutoffs, de-energization of electric distribution (and sometimes transmission) lines, as a tool to prevent igniting wildfires, particularly during high wind event days with dry ground conditions. Although the use of proactive power shutoffs were met with opposition and concerns about its use by affected communities, ultimately the CPUC acknowledged electrical corporations’ authority to de-energize lines in order to protect public safety, noting this authority in Public Utilities Code §451 and §399.2.
Oversight of de-energization events. The CPUC adopted protocols for de-energizing electric lines with a focus on who should receive notice and when, who should be responsible for notification, how different customer groups should be identified, the information that should be included in notifications in advance of and directly preceding a de-energizing event, the methods of communication, and how the electrical corporations should communicate and coordinate with public safety partners before, during, and after an event. Electrical corporations are also required to incorporate their protocols and procedures for proactive power shutoffs, as required by CPUC rules, within their WMPs. The CPUC and electrical corporations work with the OES, Cal FIRE, and first-responders to address potential impacts of utility de-energization practices on emergency response activities, including evacuations. The CPUC is also monitoring the development and continuously assessing implementation of de-energization programs by utilities, including performing a review of de-energization events. In adopting the initial protocols, the CPUC commissioners expressed a desire that the power shutoffs would only be used as a “last resort” by the utilities. However, the use of proactive power shutoffs by electric utilities became widespread and increased concerns that the practice is relied upon more frequently than a last resort. In some instances, de-energization events overlap and result in customers experiencing extended days with loss of power.
January 2025 Santa Ana wind events, de-energization, and catastrophic fires. This January, with expected severe Santa Ana winds, low-humidity, high vegetation growth from previous wet winters, and dry conditions due to delayed precipitation, Southern California was at high risk for wildfires. Additionally, aerial fire suppression was limited by the extreme winds, which included gusts approaching 100 mph in some areas. Both Southern California Edison (SCE) and San Diego Gas & Electric (SDG&E) executed proactive power shutoffs in their service territory as a public safety measure. In the case of SCE, the proactive power shutoffs resulted in extended outages throughout their service territory impacting upwards of 500,000 plus customer accounts (affecting many times more individuals) between January 2 through January 27, including two separate (and, in some cases overlapping) events. These de-energization events coincided with several wildfires in the area, including two historically large catastrophic fires, the Palisades Fire and the Eaton Fire. The fire investigations as to the cause of these fires are still in process and ignition causes have not been determined. However, there has been widespread speculation that an idle transmission line operated by SCE may be the cause of the Eaton Fire.
Based on SCE’s post-event reports, the proactive power shutoffs were the largest number of affected customers in their service territory since the tool had been deployed and likely the largest in duration. These events resulted in many frustrations for customers and local governments as the utility’s execution of the proactive power shutoffs seems to have been greatly challenged by the scale and duration of the events (official CPUC oversight and review of these events is in process) with reports that their website crashed, inadequate notifications to customers, inability of some local governments to reach a utility point person, and inaccurate maps displayed at times on their websites. SCE also adjusted their operational thresholds in the midst of the events, due to the evolving conditions, which resulted in many customers unexpectedly experiencing outages without any advance notification. SCE’s post-event reports also indicated nearly 100 incidents of damage on de-energized facilities that, if they had been energized, could have been a significant risk to igniting wildfires.
Comments
Need for this bill. The author contends that the destruction of the Eaton Fire in Altadena underscores the need to expand how wildfire risk is assessed. Their office notes that the area was not officially classified as high risk, an analysis by the Los Angeles Times found that 94% of properties within the fire’s perimeter were rated by First Street as having “severe” or “extreme” fire risk, with at least a 1 in 7 chance of experiencing a wildfire over 30 years. The author argues that recent wildfires revealed gaps in our state’s mitigation efforts. While the Altadena area was not officially classified as high risk, the destruction of the Eaton Fire underscores the need to expand how wildfire risk is assessed. Slow response time to firefighters during the wildfires, as reported by the media, highlight the need for better coordination with emergency services. This includes assessing public safety power shutoff (PSPS) to ensure decisions on power shutoffs are transparent and clearly communicated.
Desire to make explicit and expand power shutoff protocols. This bill includes various provisions to address wildfire risks and mitigation, largely in response to the events in January, including the widespread power shutoffs by SCE and the catastrophic fires (for which the cause has not been determined). As it relates to notifications of de-energization events to customers, the current CPUC protocols require specified notifications to customers, public safety partners, and others. However, as noted above, SCE’s execution of the events in January seem to not have provided the necessary notifications to many of their customers due to the evolving conditions and inadequate response by the utility. The need to ensure accurate and timely information is critical, as the loss of power can have many impacts on customers and communities.
Prohibiting large electrical corporations to recover unspecified amount of wildfire mitigation in their ratebase. AB 1054 (Holden, Chapter 79, Statutes of 2019) included a provision that prohibited the state’s three large electrical corporations from recovering $5 billion of fire risk mitigation capital expenditures in their equity rate base. The specific amount for each of the utilities was determined by the allocation metric used for their contributions to participate in the Wildfire Fund. This bill alludes to an additional unspecified amount that would be prohibited from the electrical corporation’s ratebase in order to reduce costs to ratepayers. The reference is in anticipation of separate legislation that may be authorize a specified amount, as currently proposed in SB 254 (Becker, 2025). In opposition to the bill, SDG&E argues this provision would fundamentally impair the financial health of the electrical corporations by prohibiting them from earning an authorized return on just and reasonable investments. They argue that excluding significant capital expenditures from the equity rate base could potentially harm their credit ratings and increase the cost of borrowing which would affect their customers.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee:
- The Office of Energy Infrastructure Safety (OEIS) estimates ongoing costs of $562,980 annually (ratepayer funds) and 3 positions to modify WMP guidelines and review WMPs consistent with the requirements of this bill.
- The CPUC estimates ongoing costs of about $474,000 annually (ratepayer funds) and 2 positions to cover additional workload related to safety certification, WMP review, and analysis of undergrounding project financing structures.
- To the extent that this bill impacts electricity rates, it could result in costs or savings to the state as an electric utility ratepayer. The State of California is an electricity customer, purchasing roughly one percent of the state’s electricity. As such, the state incurs costs when rates increase, and realizes cost savings if rates go down (various funds).
SUPPORT: (Verified 5/22/25)
Altadena Chamber of Commerce & Civic Association
Altadena Library District
Jewish Federation of the Greater San Gabriel and Pomona Valley
OPPOSITION: (Verified 5/22/25)
North American Wood Pole Council
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison
Treated Wood Council
Western Wood Preservers Institute
ARGUMENTS IN SUPPORT: According to the author:
SB 256 strengthens California’s wildfire and emergency response policies by expanding mitigation planning to include areas adjacent to high-risk areas and addressing past communication failures to improve future coordination. It also requires annual preparedness workshops, mandates utilities to collaborate with regional emergency centers, and enhances PSPS notifications.
ARGUMENTS IN OPPOSITION: PG&E, SCE, and SDG&E oppose this bill arguing it would complicate existing wildfire mitigation efforts and create concerns regarding unconstitutional takings, particularly as it proposes to set a cap on the rate of return. SDG&E expresses concerns that this bill creates conflicting and redundant requirements related to PSPS events and WMP, resulting in regulatory overlap and administrative inefficiencies. They state that requirements related to the PSPS programs, event notifications, and regional coordination and collaboration are already addressed by CPUC guidelines and associated reporting.
The Western Wood Preservers Institute, North American Wood Pole Council, and Treated Wood Council oppose this bill’s requirement that all electrical corporations participate in the expected utility distribution infrastructure undergrounding program. They contend there are above ground technological advancements to hardening electrical infrastructure that are more cost-effective solutions that should be considered.
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
5/25/25 14:23:37
**** END ****
SENATE COMMITTEE ON APPROPRIATIONS
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
SB 256 (Pérez) - Electricity: electrical infrastructure: wildfire mitigation: emergency operations
Version: May 5, 2025 | Policy Vote: E., U. & C. 14 - 2 |
Urgency: No | Mandate: Yes |
Hearing Date: May 19, 2025 | Consultant: Ashley Ames |
Bill Summary:
This bill would make various changes related to wildfire mitigation by electrical corporations, including to require that electrical corporations consider the conversion of overhead electrical distribution utility infrastructure to underground and to prohibit the California Public Utilities Commission (CPUC) from allowing a large electrical corporation to include in its equity rate base its share of fire risk mitigation capital expenditures, as provided.
Fiscal Impact:
- The Office of Energy Infrastructure Safety (OEIS) estimates ongoing costs of $562,980 annually (ratepayer funds) and 3 positions to modify WMP guidelines and review WMPs consistent with the requirements of this bill.
- The CPUC estimates ongoing costs of about $474,000 annually (ratepayer funds) and 2 positions to cover additional workload related to safety certification, WMP review, and analysis of undergrounding project financing structures.
- To the extent that this bill impacts electricity rates, it could result in costs or savings to the state as a an electric utility ratepayer. The State of California is an electricity customer, purchasing roughly one percent of the state’s electricity. As such, the state incurs costs when rates increase, and realizes cost savings if rates go down (various funds).
Background:
California wildfire and electric utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Risks for wildfires also increased with the extended drought and bark beetle infestation that has increased tree mortalities and, as a result, increased the fuel, and risk for wildfires. In recent years, California has experienced a number of catastrophic wildfires, including several ignited by electrical utility infrastructure.
Deenergizing electric lines. Generally, electric utilities attempt to maintain power and ensure continued reliability of the flow of electricity. However, catastrophic fires in recent years have demonstrated the risk of ignition by electric utility infrastructure can pose great damage and loss of life, perhaps greater than the risks of turning off the power to certain electrical circuits. As a safety consideration, electric utilities have the ability and authority to deenergize electric lines in order to prevent harm or threats of harm. However, deenergizing electric lines can result in the loss of electricity to households, businesses, traffic signals, communication systems, water treatment facilities, emergency services and other critical which can also cause harm, as well as, economic impacts to residents and businesses. Therefore, efforts to deenergize electric lines must consider the potential harm of the energized lines causing a wildfire against the safety hazards associated with eliminating electricity to the areas served by the line(s).
Wildfire Mitigation Plan. As a result of SB 1028 (Hill, Chapter 598, Statutes of 2016), and further expanded by SB 901 (Dodd, Chapter 626, Statutes of 2018) and AB 1054 (Holden, Chapter 79, Statutes of 2019), electric investor-owned utilities (IOUs) are required to file WMPs with guidance by OEIS (as of 2021). OEIS reviews and determines whether to approve these plans and ensures compliance with guidance and statute. The electric IOUs’ WMPs detail, describe and summarize electric IOU responsibilities, actions, and resources to mitigate wildfires. These actions include plans to harden their system to prevent wildfire ignitions caused by utility infrastructure, such as widespread electric line replacement with covered conductors designed to lower wildfire ignition, pole replacement, and other actions. The plans also include information regarding the electric IOUs’ efforts to conduct extensive vegetation management to reduce the risk of tree branches, grasses, and other vegetation from coming into contact with utility infrastructure. The WMPs also require electric utilities to incorporate their protocols and procedures for proactive power shutoffs as required by CPUC rules.
Proposed Law:
This bill would make various changes related to wildfire mitigation by electrical corporations. Specifically, it would:
- Require, for the description in the WMP of the preventive strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, electrical corporations, electrical cooperatives, and local electric publicly owned utilities (POUs) to include consideration of areas adjacent to high fire threat areas. For an electrical corporation’s WMP, the bill would require the protocols for disabling reclosers and deenergizing portions of the electrical distribution system to consider the impacts on the opportunity for residents within a household who are not the customer of record to subscribe to receive notifications related to deenergization events and communication with public safety partners that have the ability to coordinate with electrical corporations to provide broader messaging to affected communities. The bill would also require that an electrical corporation’s WMP include, for areas affected by wildfires that require electrical distribution infrastructure to be rebuilt by an electrical corporation, consideration of undergrounding distribution infrastructure if it is determined to be cost effective compared to other wildfire mitigation strategies..
- Require a WMP to include an identification of any lapses in communication coordination during recent past emergency response events with local governments, as specified, and a description of any opportunities to collaborate with local governments, and other steps that can be taken to establish more efficient communication coordination during future emergency responses, as provided.
- Require electrical corporations, electrical cooperatives, and local electric POUs to conduct annual wildfire preparedness workshops in collaboration with and open to any local fire departments in their service areas to provide updates on the latest adopted WMPs, discuss any lapses in, and opportunities to increase efficiency of, communication coordination during emergency responses, and gather input for inclusion in the development of the next annual submission of their WMPs, as provided.
- Prohibit the CPUC from allowing a large electrical corporation to include in its equity rate base its share of a specified amount that the large electrical corporations collectively first expend on fire risk mitigation capital expenditures approved by the CPUC on or after January 1, 2025, as provided.
- Require all electrical corporations and local electric POUs that have service areas that overlap with the boundaries of a state regional emergency operations center, in cooperation with Office of Emergency Services (OES), and other emergency service agencies, to establish procedures for the coordination of efforts between electrical corporations and local electric POUs and their representatives and those of emergency response agencies.
- Require these electrical corporations and local electric POUs to assign a representative to work within each state regional operations center that has boundaries that overlap with the electrical corporation’s or local electric POU’s service area.
- Require the representative to complete the appropriate Standardized Emergency Management System training.
- Provide that no reimbursement would be required for specified reasons.
Related Legislation:
SB 254 (Becker) of the current legislative session, includes various proposals to address electric utility bill affordability, including requirements to consider the time required to implement an action and the amount of risk reduced when electric utilities implement wildfire mitigation strategies.
SB 272 (Cervantes) of the current legislative session, includes various proposals related to deenergizaton events.
SB 332 (Wahab) of the current legislative session, includes various proposals, including consideration of underground of electrical infrastructure within an electrical corporation’s wildfire mitigation plan.
SB 559 (Stern) of the current legislative session, would require electrical corporations to provide specified notifications of deenergization events related to mitigating wildfire ignition risks, and requires specified reporting to, and oversight by, the CPUC.
SB 1003 (Dodd) of 2024, would have modified timelines relevant to the wildfire mitigation plans by electrical corporations and requires the electrical corporations to take into account both the time required to implement an action and the amount of risk reduced for the costs and risk remaining. The bill was held on the Assembly Floor.
SB 884 (McGuire, Chapter 819, Statutes of 2022) required the CPUC to establish an expedited electric utility distribution infrastructure undergrounding program for large electrical corporations.
SB 533 (Stern, Chapter 244, Statutes of 2021) required electrical corporations to identify circuits that have frequently been deenergized to mitigate the risk of wildfire and the measures taken to reduce the need for future deenergization of those circuits, as specified.
AB 1054 (Holden, Chapter 79, Statutes of 2019) included numerous provisions related to addressing wildfires caused by electric utility infrastructure, including: bolstering safety oversight and processes, recasting recovery of costs from damages to third-parties, including the authorization for an electrical corporation and ratepayer jointly funded Wildfire Fund to address future damages.
SB 167 (Dodd, Chapter 403, Statutes of 2019) required electrical corporations to include impacts on customers enrolled in specified programs as part of the protocols for deenergizing portions of their distribution system within their WMP.
SB 901 (Dodd, Chapter 626, Statutes of 2018) addressed numerous issues concerning wildfire prevention, response and recovery, including funding for mutual aid, fuel reduction and forestry policies, WMP by electric utilities, and cost recovery by electric corporations of wildfire-related damages.
SB 1028 (Hill, Chapter 598, Statutes of 2016) required electric CPUC-regulated utilities to file annual WMPs and requires the CPUC to review and comment on those plans.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Josh Becker, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 4/29/2025
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill includes various provisions related to wildfire mitigation by electrical corporations, including notifications regarding deenergizations and the conversion of overhead electrical distribution utility infrastructure to underground.
ANALYSIS:
Existing law:
- Establishes the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Establishes the Office of Energy Infrastructure Safety (OEIS) is the successor to, and, effective July 1, 2021, is vested with, all of the duties, powers, and responsibilities of the Wildfire Safety Division within the CPUC established pursuant to Section 326 of the Public Utilities Code, including, but not limited to, the power to compel information and conduct investigations. (Government Code §15475)
- Requires every public utility to furnish and maintain adequate, efficient, just, and reasonable service, instrumentalities, equipment, and facilities, as are necessary to promote the safety, health, comfort, and convenience of its patrons, employees, and the public. (Public Utilities Code §451)
- Establishes the policy of the state that each electrical corporation is required to continue operate its electric distribution grid in its service territory and to do so in a safe, reliable, efficient, and cost-effective manner. (Public Utilities Code §399.2(a))
- Authorizes the CPUC to supervise and regulate every public utility in the state and to do all things necessary and convenient in the exercise of such power and jurisdiction. (Public Utilities Code §701)
- Requires an electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. (Public Utilities Code §8386 (a))
- Requires each electrical corporation to annually prepare a wildfire mitigation plan (WMP) and to submit the plan to the Wildfire Safety Division, and, as of July 1, 2021, to the OEIS, for review and approval. (Public Utilities Code §8386 (b))
- Requires a WMP of an electrical corporation to include, among other things, protocols for deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, and protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communications infrastructure. (Public Utilities Code §§8386 (c)(6))
- Requires a WMP plan of an electrical corporation to also include appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines and requires these procedures to consider the need to notify, as a priority, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of a potential deenergization event. (Public Utilities Code §8386 (c)(7))
- Requires the WMP of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits. (Public Utilities Code §8386 (c)(8))
- Requires the CPUC to establish an expedited utility distribution undergrounding program. Requires, to participate in the program, large electrical corporations to submit to the OEIS a distribution infrastructure undergrounding plan meeting certain requirements. Requires the OEIS upon the submission of the plan, to publish the plan for public comment. (Public Utilities Code §8388.5)
This bill:
- Requires electrical corporations, electrical cooperatives, and local electric publicly owned utilities (POUs) to include consideration of low-risk areas for the description in the WMP of the preventive strategies and programs to minimize the risk of its electrical lines and equipment causing catastrophic wildfires.
- Requires a WMP to include an identification of any lapses in communication coordination during recent past emergency response events with local governments, as specified, and a description of any opportunities to collaborate with local governments, and other steps that can be taken to establish more efficient communication coordination during future emergency responses, as provided.
- Requires electrical corporations, electrical cooperatives, and local electric POUs to conduct annual wildfire preparedness workshops in collaboration with and open to any local fire departments in their service areas to provide updates on the latest adopted WMPs, discuss any lapses in, and opportunities to increase efficiency of, communication coordination during emergency responses, and gather input for inclusion in the development of the next annual submission of their WMPs, as provided.
- Requires the CPUC to require all electrical corporations to participate in the program expedited undergrounding program, as specified.
- Requires the CPUC to coordinate with the OEIS to make participation in the program a requirement for obtaining the safety certification.
- Requires the CPUC to adopt a decision on the financing of infrastructure projects conducted pursuant to the program that implements a revised return on equity structure for electrical corporations that caps the maximum allowable return on capital investment at a set percentage for undergrounding and that may include either securitization for specific projects, as specified, or public-private partnerships or public ownership models. Requires the CPUC to ensure that this decision leads to reduced long-term expenses for customers.
- Requires all electrical corporations and local electric POUs that have service areas that overlap with the boundaries of a state regional emergency operations center, in cooperation with Office of Emergency Services (OES), and other emergency service agencies, to establish procedures for the coordination of efforts between electrical corporations and local electric POUs and their representatives and those of emergency response agencies.
- Requires these electrical corporations and local electric POUs to assign a representative to work within each state regional operations center that has boundaries that overlap with the electrical corporation’s or local electric POU’s service area.
- Requires the representative to complete the appropriate Standardized Emergency Management System training. Requires the CPUC to update the deenergization guidelines adopted to require each electrical corporation and local electric POU to establish a means for notifying customers and noncustomers located in an area subject to a public safety power shutoff that is accomplished in partnership with OES through the use of the Emergency Alert System and update to the alert and warning guidelines, as specified.
- Requires the means of notification to do specified things, including be designed to be an alert that allows customers or noncustomers to opt out of receiving future alerts and include specified things including a procedure that notifies customers and noncustomers of the expected or estimated time of service restoration, as specified.
Background
California wildfire and electric utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Risks for wildfires also increased with the extended drought and bark beetle infestation that has increased tree mortalities and, as a result, increased the fuel, and risk for wildfires. In recent years, California has experienced a number of catastrophic wildfires, including several ignited by electrical utility infrastructure.
Deenergizing electric lines. Generally, electric utilities attempt to maintain power and ensure continued reliability of the flow of electricity. However, catastrophic fires in recent years have demonstrated the risk of ignition by electric utility infrastructure can pose great damage and loss of life, perhaps greater than the risks of turning off the power to certain electrical circuits. As a safety consideration, electric utilities have the ability and authority to deenergize electric lines in order to prevent harm or threats of harm. However, deenergizing electric lines can result in the loss of electricity to households, businesses, traffic signals, communication systems, water treatment facilities, emergency services and other critical which can also cause harm, as well as, economic impacts to residents and businesses. Therefore, efforts to deenergize electric lines must consider the potential harm of the energized lines causing a wildfire against the safety hazards associated with eliminating electricity to the areas served by the line(s).
Wildfire Mitigation Plan. As a result of SB 1028 (Hill, Chapter 598, Statutes of 2016), and further expanded by SB 901 (Dodd, Chapter 626, Statutes of 2018) and AB 1054 (Holden, Chapter 79, Statutes of 2019), electric investor-owned utilities (IOUs) are required to file WMPs with guidance by OEIS (as of 2021). OEIS reviews and determines whether to approve these plans and ensures compliance with guidance and statute. The electric IOUs’ WMPs detail, describe and summarize electric IOU responsibilities, actions, and resources to mitigate wildfires. These actions include plans to harden their system to prevent wildfire ignitions caused by utility infrastructure, such as widespread electric line replacement with covered conductors designed to lower wildfire ignition, pole replacement, and other actions. The plans also include information regarding the electric IOUs’ efforts to conduct extensive vegetation management to reduce the risk of tree branches, grasses, and other vegetation from coming into contact with utility infrastructure. The WMPs also require electric utilities to incorporate their protocols and procedures for proactive power shutoffs as required by CPUC rules.
History with power shutoffs. Utilities have increasingly utilized proactive power shutoffs as a tool to prevent sparking ignitions. The practice of proactively deenergizing electric circuits to prevent catastrophic wildfire began by San Diego Gas & Electric (SDG&E) after several electric utility infrastructure-ignited catastrophic fires in 2007. Proactive power shutoffs were one of the many measures SDG&E implemented to reduce the risk of fire ignited by its infrastructure (other measures included installing steel poles and expanding ground and aerial inspections). Although the use of proactive power shutoffs were met with opposition and concerns about its use by communities, ultimately the CPUC acknowledged SDG&E’s authority to deenergize lines in order to protect public safety, noting this authority in Public Utilities Code §451 and §399.2. Since then, the practice has also been expanded and adopted by the state’s two largest electric utilities – Pacific Gas & Electric (PG&E) and Southern California Edison (SCE), as well as, the smaller IOUs and exploration by POUs.
Oversight of proactive power shutoffs. The CPUC adopted protocols for deenergizing electric lines with a focus on who should receive notice and when; who should be responsible for notification; how different customer groups should be identified; the information that should be included in notifications in advance of and directly preceding a deenergizing event; the methods of communication; and how the IOUs should communicate and coordinate with public safety partners before, during, and after an event. The CPUC is working with the OES, Cal FIRE, and first-responders to address potential impacts of utility deenergization practices on emergency response activities, including evacuations. The CPUC is also monitoring the development and continuously assessing implementation of deenergization programs by utilities, including performing a review of deenergization events. In adopting the initial protocols, the CPUC commissioners expressed a desire that the power shutoffs would only be used as a “last resort” by the utilities. However, the use of proactive power shutoffs by electric utilities became widespread and increased concerns that the practice is relied upon more frequently than a last resort. In some instances, deenergization events overlap and result in customers experiencing extended days with loss of power.
Proactive power shutoff protocols. Over several years, the proactive power shutoff protocols have evolved via CPUC oversight and various CPUC decisions. The protocols include specified requirements related to advance planning with public safety partners and local governments, as well as, specified notifications to customers prior to, during, and after deenergization events. The protocols also require specified actions to address the public safety impacts for critical facilities and access and functional needs populations, among others. The CPUC and Legislature have exercised continued oversight of the utilities’ practices with the goal of minimizing the use of power shutoffs and accelerating wildfire mitigation to reduce risks of the electrical infrastructure igniting fires. However, proactive power shutoffs continue to be a tool in the electric utility’s toolbox to mitigate wildfire ignition risks. Currently, CPUC notifications require specified timing of notifications to customers and an extended (and continually evolving) list of public safety partners and critical facilities, including emergency services, government facilities, medical facilities, energy facilities, drinking water and wastewater treatment facilities, communications facilities, and others. The protocols also require electric IOUs to, whenever possible, adhere to minimum notification timelines.
Safety certificate. Under AB 1054 (Holden, 2019), the Executive Director of the CPUC is required to issue a safety certification to electric corporations that meet specific documentation criteria, pursuant to Public Utilities Code §8389. The statute provides for electrical corporations to seek a “safety certification” in order to encourage them to invest in safety and limit wildfire risks. Obtaining the safety certification affects the amount, if any, the electrical corporation must repay the Wildfire Fund for costs and expenses associated with a covered wildfire. Electrical corporations that are found to have acted reasonably by the CPUC do not have to repay the Wildfire Fund.
January 2025 Santa Ana wind events. This January, with expected severe Santa Ana winds, low-humidity, high vegetation growth from previous wet winters, and dry conditions due to delayed precipitation, Southern California was at high risk for wildfires. Additionally, aerial fire suppression was limited by the extreme winds, which included gusts approaching 100 mph in some areas. Both SCE and SDG&E executed proactive power shutoffs in their service territory as a public safety measure. In the case of SCE, the proactive power shutoffs resulted in extended outages throughout their service territory impacting upwards of 500,000 plus customer accounts (affecting many times more individuals) between January 2 through January 27, including two separate (and, in some cases overlapping) events. These deenergization events coincided with several wildfires in the area, including two large catastrophic fires, the Palisades Fire and the Eaton Fire (fire investigations as to the cause of these fires are still in process, ignition cause has not been determined).
Based on SCE’s post-event reports, the proactive power shutoffs were the largest number of affected customers in their service territory since the tool had been deployed and likely the largest in duration. These events resulted in many frustrations for customers and local governments as the utility’s execution of the proactive power shutoffs seems to have been greatly challenged by the scale and duration of the events (official CPUC oversight and review of these events is in process) with reports that their website crashed, inadequate notifications to customers, inability of some local governments to reach a utility point person, and inaccurate maps displayed at times on their websites. SCE also adjusted their operational thresholds in the midst of the events, due to the evolving conditions, which resulted in many customers unexpectedly experiencing outages without any advance notification. SCE’s post-event reports also indicated nearly 100 incidents of damage on deenergized facilities that, if they had been energized, could have been a significant risk to igniting wildfires.
Comments
Need for this bill. The author contends that the destruction of the Eaton Fire in Altadena underscores the need to expand how wildfire risk is assessed. Their office notes that the area was not officially classified as high risk, an analysis by the Los Angeles Times found that 94% of properties within the fire’s perimeter were rated by First Street as having “severe” or “extreme” fire risk, with at least a 1 in 7 chance of experiencing a wildfire over 30 years. They express concerns that since the participation in the voluntary electric utility expedited distribution infrastructure undergrounding program is optional, utilities can receive safety “certification without adopting the most impactful risk-reduction strategies, leaving communities vulnerable despite efforts to improve grid safety.”
Need for consistency with existing power shutoff guidelines. This bill includes various provisions to address wildfire risks and mitigation, largely in response to the events in January, including the widespread power shutoffs by SCE and the catastrophic fires (for which the cause has not been determined). As it relates to notifications of deenergization events to customers the current CPUC protocols require specified notifications to customers, public safety partners, and others. However, as noted above, SCE’s execution of the events in January seem to not have provided the necessary notifications to many of their customers due to the evolving conditions and inadequate response by the utility. The need to ensure accurate and timely information is critical, as the loss of power can have many impacts on customers and communities. The CPUC is in the process of reviewing SCE’s execution of the events and should it find the utility did not execute as required, they may fine and penalize the utility.
Addressing wildfire risks. This bill would require electrical corporations to participate in the voluntary expedited utility undergrounding program created by SB 884 (McGuire, Chapter 819, Statutes of 2022). The costs to underground electrical infrastructure can run into several millions of dollars per mile of electrical circuit. These costs can put further pressure on electric utility bills, even as they may help reduce wildfire risks. Additionally, undergrounding circuits can take several years, which could continue to expose customers to the risks of wildfires and added expense of additional mitigation measures. In this regard, the Legislature may wish to proceed with caution given that affordability of electric utility bills has been expressed as a top concern. Additionally, the provisions in this bill which attempt to address these concerns by limiting the electrical corporation’s return on equity, authorizing securitization, and public ownership models, would be limited in providing additional savings, particularly as public ownership models of utility distribution infrastructure would necessitate a much larger consideration and study, beyond the scope of this bill.
Need for amendments. In order to ensure consistency with the existing guidelines and protocols for deenergization events, the author and committee may wish to amend this bill to recast the language related to notifications and related to undergrounding to within the WMP. These amendments would:
- Require consideration of undergrounding where it is cost-effective for areas rebuilding after a wildfire.
- Ensure the language reflects the notifications to public safety partners, instead of noncustomers who would be difficult for the utility to notify.
- Ensure references to local publicly owned utilities reflect their WMP framework.
- Delete specific references to public ownership models.
- Delete the requirements to tie additional specified actions to the safety certificate.
Prior/Related Legislation
SB 254 (Becker) of the current legislative session, includes various proposals to address electric utility bill affordability, including requirements to consider the time required to implement an action and the amount of risk reduced when electric utilities implement wildfire mitigation strategies. The bill is pending in this committee.
SB 272 (Cervantes) of the current legislative session, includes various proposals related to deenergizaton events. The bill is pending in this committee.
SB 332 (Wahab) of the current legislative session, includes various proposals, including consideration of underground of electrical infrastructure within an electrical corporation’s wildfire mitigation plan. The bill is pending in the Senate Appropriations Committee.
SB 559 (Stern) of the current legislative session, requires electrical corporations to provide specified notifications of deenergization events related to mitigating wildfire ignition risks, and requires specified reporting to, and oversight by, the CPUC. The bill is pending in the Senate Appropriations Committee.
SB 1003 (Dodd) of 2024, would have modified timelines relevant to the wildfire mitigation plans by electrical corporations and requires the electrical corporations to take into account both the time required to implement an action and the amount of risk reduced for the costs and risk remaining. The bill was held on the Assembly Floor.
SB 884 (McGuire, Chapter 819, Statutes of 2022) required the CPUC to establish an expedited electric utility distribution infrastructure undergrounding program for large electrical corporations.
SB 533 (Stern, Chapter 244, Statutes of 2021) required electrical corporations to identify circuits that have frequently been deenergized to mitigate the risk of wildfire and the measures taken to reduce the need for future deenergization of those circuits, as specified.
AB 1054 (Holden, Chapter 79, Statutes of 2019) included numerous provisions related to addressing wildfires caused by electric utility infrastructure, including: bolstering safety oversight and processes, recasting recovery of costs from damages to third-parties, including the authorization for an electrical corporation and ratepayer jointly funded Wildfire Fund to address future damages.
SB 167 (Dodd, Chapter 403, Statutes of 2019) required electrical corporations to include impacts on customers enrolled in specified programs as part of the protocols for deenergizing portions of their distribution system within their WMP.
SB 901 (Dodd, Chapter 626, Statutes of 2018) addressed numerous issues concerning wildfire prevention, response and recovery, including funding for mutual aid, fuel reduction and forestry policies, WMP by electric utilities, and cost recovery by electric corporations of wildfire-related damages.
SB 1028 (Hill, Chapter 598, Statutes of 2016) required electric CPUC-regulated utilities to file annual WMPs and requires the CPUC to review and comment on those plans.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
None received
OPPOSITION:
North American Wood Pole Council
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison
Treated Wood Council
Western Wood Preservers Institute
ARGUMENTS IN SUPPORT: According to the author:
SB 256 strengthens California’s wildfire and emergency response policies by expanding mitigation planning to include low-risk areas and addressing past communication failures to improve future coordination. It also requires annual preparedness workshops, mandates utilities to collaborate with regional emergency centers, and enhances PSPS notifications. Finally, it also makes participation in the undergrounding program mandatory for utilities seeking safety certification and directs the CPUC to develop a financing plan that reduces long-term costs for customers while limiting utility profits on undergrounding projects.
ARGUMENTS IN OPPOSITION: PG&E, SCE, and SDG&E oppose this bill arguing it would complicate existing wildfire mitigation efforts and create concerns regarding unconstitutional takings, particularly as it proposes to set a cap on the rate of return. They also oppose the bill requiring electrical corporations to participate in the expedited undergrounding program to obtain a safety certificate. Furthermore, they raise concerns about the infeasibility of notifying noncustomers about deenergization events.
The Western Wood Preservers Institute, North American Wood Pole Council, and Treated Wood Council oppose the bill’s requirement that all electrical corporations participate in the expected utility distribution infrastructure undergrounding program. They contend there are above ground technological advancements to hardening electrical infrastructure that are more cost-effective solutions that should be considered.
-- END --
Discussed in Hearing
Assembly Standing Committee on Emergency Management
Assembly Standing Committee on Utilities and Energy
Senate Floor
Senate Standing Committee on Energy, Utilities and Communications
Bill Author
Bill Co-Author(s):