SB 292: Electricity: wildfire mitigation: deenergization events and reliability.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2025-09-13
Current Status:
Failed
(2026-03-02: Veto sustained.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law requires electrical corporations, local publicly owned electric utilities, and electrical cooperatives to annually prepare wildfire mitigation plans that include, among other things, descriptions of protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety and protocols related to mitigating public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system. Existing law requires the wildfire mitigation plans of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits.
This bill would require electrical corporations to work with representatives of state agencies and community-based organizations that serve, advocate on behalf of, or serve and advocate on behalf of, persons from the access and functional needs population, as defined, to develop and make publicly available a plan to support that population during deenergization events, as provided. The bill would require electrical corporations, after each deenergization event, to prepare a post-deenergization event report, as provided, and would require the report to be filed, served, distributed, and published, as specified. The bill would require the Public Utilities Commission, on or before January 1, 2027, to determine whether that report should also include other specified information.
Existing law requires the commission to require an electrical corporation to include in an annual reliability report information on the reliability of service to end-use customers that identifies the frequency and duration of interruptions of service. Existing law requires that information in the annual reliability report prepared by an electrical corporation and made publicly available be provided with sufficient confidentiality to protect electrical system security.
This bill would require the commission, on or before January 1, 2027, to determine whether its existing policies, procedures, and rules should be revised or enhanced to augment the safety and reliability of the electrical distribution system, as provided. The bill would require a local publicly owned electric utility to prepare an annual reliability report that identifies the frequency and duration of interruptions of service and includes certain other information. The bill would require that information in the annual reliability report prepared by the local publicly owned electric utility and made publicly available be provided with sufficient confidentiality to protect electrical system security. By imposing additional duties on a local publicly owned electric utility, the bill would impose a state-mandated local program.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
Existing constitutional provisions require that a statute that limits the right of access to the meetings of public bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest protected by the limitation and the need for protecting that interest.
This bill would make legislative findings to that effect.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law requires electrical corporations, local publicly owned electric utilities, and electrical cooperatives to annually prepare wildfire mitigation plans that include, among other things, descriptions of protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety and protocols related to mitigating public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system. Existing law requires the wildfire mitigation plans of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits.
This bill would require electrical corporations to work with representatives of state agencies and community-based organizations that serve, advocate on behalf of, or serve and advocate on behalf of, persons from the access and functional needs population, as defined, to develop and make publicly available a plan to support that population during deenergization events, as provided. The bill would require electrical corporations, after each deenergization event, to prepare a post-deenergization event report containing certain information related to the deenergization event, report, as provided, and would require the report to be provided to the locally elected body and specified individuals of the cities and counties affected by the deenergization event. filed, served, distributed, and published, as specified. The bill would require the Public Utilities Commission, on or before January 1, 2027, to determine whether that report should also include other specified information.
Existing law requires the commission to require an electrical corporation to include in an annual reliability report information on the reliability of service to end-use customers that identifies the frequency and duration of interruptions of service. Existing law requires that information in the annual reliability report prepared by an electrical corporation and made publicly available be provided with sufficient confidentiality to protect electrical system security.
This bill would require the commission, on or before January 1, 2027, to determine whether an annual reliability report prepared by an electrical corporation should include specified information, including, among other things, system- and division-level reliability and reliability statistics at census tracts or smaller resolutions. its existing policies, procedures, and rules should be revised or enhanced to augment the safety and reliability of the electrical distribution system, as provided. The bill would require a local publicly owned electric utility to prepare an annual reliability report that identifies the frequency and duration of interruptions of service and includes certain other information. The bill would require that information in the annual reliability report prepared by the local publicly owned electric utility and made publicly available be provided with sufficient confidentiality to protect electrical system security. By imposing additional duties on a local publicly owned electric utility, the bill would impose a state-mandated local program.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
Existing constitutional provisions require that a statute that limits the right of access to the meetings of public bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest protected by the limitation and the need for protecting that interest.
This bill would make legislative findings to that effect.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law requires electrical corporations, local publicly owned electric utilities, and electrical cooperatives to annually prepare wildfire mitigation plans that include, among other things, descriptions of protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety and protocols related to mitigating public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system. Existing law requires the wildfire mitigation plans of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits.
This bill would require electrical corporations to work with representatives of state agencies and community-based organizations that serve, advocate on behalf of, or serve and advocate on behalf of, persons from the access and functional needs population, as defined, to develop and make publicly available a plan to support that population during deenergization events, as provided. The bill would require electrical corporations, after each deenergization event, to prepare a post-deenergization event report containing certain information related to the deenergization event, as provided, and would require the report to be provided to the locally elected body and specified individuals of the cities and counties affected by the deenergization event. The bill would require the commission, Public Utilities Commission, on or before January 1, 2027, to determine whether that report should also include other specified information.
Existing law requires the Public Utilities Commission commission to require an electrical corporation to include in an annual reliability report information on the reliability of service to end-use customers that identifies the frequency and duration of interruptions of service. Existing law requires that information in the annual reliability report prepared by an electrical corporation and made publicly available be provided with sufficient confidentiality to protect electrical system security.
This bill would require the commission, on or before January 1, 2027, to determine whether a an annual reliability report prepared by an electrical corporation should include specified information, including, among other things, system- and division-level reliability and reliability statistics at census tracts or smaller resolutions. The bill would require a local publicly owned electric utility to prepare an annual reliability report that is equivalent to those prepared by an electrical corporation, as specified. identifies the frequency and duration of interruptions of service and includes certain other information. The bill would require that information in the annual reliability report prepared by the local publicly owned electric utility and made publicly available be provided with sufficient confidentiality to protect electrical system security. By imposing additional duties on a local publicly owned electric utility, the bill would impose a state-mandated local program.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
Existing constitutional provisions require that a statute that limits the right of access to the meetings of public bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest protected by the limitation and the need for protecting that interest.
This bill would make legislative findings to that effect.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law requires electrical corporations, local publicly owned electric utilities, and electrical cooperatives to annually prepare wildfire mitigation plans that include, among other things, descriptions of protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety and protocols related to mitigating public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system. Existing law requires the wildfire mitigation plans of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits.
This bill would require electrical corporations, local publicly owned electric utilities, and electrical cooperatives corporations to work with persons from the access and functional needs population, as defined, to develop and make publicly available a plan to support that population during deenergization events. events, as provided. The bill would require electrical corporations, local publicly owned electric utilities, and electrical cooperatives, after each deenergization event, to prepare a post-deenergization event report containing certain information related to the deenergization event, as provided, and would require the report to be provided to the locally elected body and specified individuals of the cities and counties affected by the deenergization event. By imposing additional duties on local agencies, the bill would impose a state-mandated local program. The bill would require the commission, on or before January 1, 2027, to determine whether that report should include other specified information.
Existing law requires the Public Utilities Commission to require an electrical corporation to include in its an annual reliability report information on the reliability of service to end-use customers that identifies the frequency and duration of interruptions of service.
This bill would require the commission, on or before January 1, 2027, to determine whether a reliability report prepared by an electrical corporation should include specified information, including, among other things, system- and division-level reliability and reliability statistics at census tracts or smaller resolutions. The bill would require a local publicly owned electric utilities utility to prepare an annual reliability reports report that are is equivalent to those prepared by an electrical corporation. The bill would require the reliability report prepared by electrical corporations and local publicly owned electric utilities to include specified information, including, among other things, system- and division-level reliability and reliability statistics at census tracts or smaller resolutions. corporation, as specified. By imposing additional duties on a local agencies, publicly owned electric utility, the bill would impose a state-mandated local program.
Existing law requires the commission to establish an expedited utility distribution undergrounding program. To participate in the program, existing law requires large electrical corporations to submit to the Office of Energy Infrastructure Safety a distribution infrastructure undergrounding plan meeting certain requirements. Existing law requires the office, upon the submission of the plan, to publish the plan for public comment.This bill would require the office to publish the plan on its internet website.Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law requires electrical corporations, local publicly owned electric utilities, and electrical cooperatives to annually prepare wildfire mitigation plans that include, among other things, descriptions of protocols for disabling reclosers and deenergizing portions of their the electrical distribution systems system that consider the associated impacts on public safety and protocols related to mitigating public safety impacts of disabling reclosers and the deenergization of deenergizing portions of the electrical distribution system. Existing law requires the wildfire mitigation plans of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits.
This bill would require electrical corporations, local publicly owned electric utilities, and electrical cooperatives to develop and make publicly available a plan to support work with persons from the access and functional needs populations, population, as defined, to develop and make publicly available a plan to support that population during deenergization events. The bill would require those entities, electrical corporations, local publicly owned electric utilities, and electrical cooperatives, after each deenergization event, to prepare a report containing certain information related to the deenergization event, as provided, and to provide would require the report to be provided to the locally elected body and specified individuals of the cities and counties affected by the deenergization event. By imposing additional duties on local agencies, this the bill would impose a state-mandated local program.
Existing law requires the Public Utilities Commission to require an electrical corporation to include in its annual reliability report information on the reliability of service to end-use customers that identifies the frequency and duration of interruptions of service.
This bill would require local publicly owned electric utilities to prepare annual reliability reports that are equivalent to those prepared by the an electrical corporation. The bill would require the reliability report prepared by electrical corporations and local publicly owned electric utilities to focus on include specified information, including, among other things, system- and division-level reliability and reliability statistics at census tracts or neighborhoods within them. smaller resolutions. By imposing additional duties on local agencies, this the bill would impose a state-mandated local program.
Existing law requires the commission to establish an expedited utility distribution undergrounding program. To participate in the program, existing law requires large electrical corporations to submit to the Office of Energy Infrastructure Safety a distribution infrastructure undergrounding plan meeting certain requirements. Existing law requires the office, upon the submission of the plan, to publish the plan for public comment.
This bill would require the office to publish the plan on its internet website.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law requires electrical corporations, local publicly owned electric utilities, and electrical cooperatives to annually prepare wildfire mitigation plans that include, among other things, descriptions of protocols for disabling reclosers and deenergizing portions of their electrical distribution systems that consider the associated impacts on public safety and protocols related to mitigating public safety impacts of disabling reclosers and the deenergization of portions of the electrical distribution system. Existing law requires the wildfire mitigation plans of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits.
This bill would require electrical corporations, local publicly owned electric utilities, and electrical cooperatives to develop and make publicly available a plan to support access and functional needs populations, as defined, during deenergization events. The bill would require those entities, after each deenergization event, to prepare a report containing certain information related to the deenergization event, as provided, and to provide the report to cities and counties affected by the deenergization event. By imposing additional duties on local agencies, this bill would impose a state-mandated local program.
Existing law requires the Public Utilities Commission to require an electrical corporation to include in its annual reliability report information on the reliability of service to end-use customers that identifies the frequency and duration of interruptions of service.
This bill would require local publicly owned electric utilities to prepare annual reliability reports that are equivalent to those prepared by the electrical corporation. The bill would require the reliability report prepared by electrical corporations and local publicly owned electric utilities to focus on system- and division-level reliability and census tracts or neighborhoods within them. By imposing additional duties on local agencies, this bill would impose a state-mandated local program.
Existing law requires the commission to establish an expedited utility distribution undergrounding program. To participate in the program, existing law requires large electrical corporations to submit to the Office of Energy Infrastructure Safety a distribution infrastructure undergrounding plan meeting certain requirements. Existing law requires the office, upon the submission of the plan, to publish the plan for public comment.
This bill would require the office to publish the plan on its internet website.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
The State Aeronautics Act governs the creation and operation of airports in this state for the purpose of protecting the public interest in aeronautics and aeronautical progress through identified means. Existing law authorizes the Department of Transportation to adopt, administer, and enforce rules and regulations for the administration of the act.This bill would make nonsubstantive changes to that authorization.The State Aeronautics Act governs the creation and operation of airports in this state for the purpose of protecting the public interest in aeronautics and aeronautical progress through identified means. Existing law authorizes the Department of Transportation to adopt, administer, and enforce rules and regulations for the administration of the act.
This bill would make nonsubstantive changes to that authorization.
(a)(1)The commission shall require an electrical corporation to include in an annual reliability report, required pursuant to Decision 96-09-045, as amended, or a decision that supersedes Decision 96-09-045, information on the reliability of service to end use customers that identifies, but is not limited to, the frequency and duration of interruptions in services. This information shall indicate areas with both the most frequent and longest outages, using local areas determined by the commission. The commission, in consultation with the electrical corporation, shall ensure that the geographical boundaries of local areas do not split up circuits for reporting purposes, if the electrical corporation aggregates data by circuits. The information shall be sufficiently aggregated to both maintain electrical system security, and be of use and relevance to affected customers of the electrical corporation.
(2)Before July 1, 2014, the commission shall determine the local areas for the purposes of paragraph (1).
(3)The requirements of paragraph (1) shall apply to annual reliability reports due after July 1, 2014.
(4)(A)On or before January 1, 2027, the commission shall determine, as part of the proceeding in Rulemaking 24-05-023 (June 6, 2024), Order Instituting Rulemaking to Update Rules for the Safety, Reliability, and Resiliency of Electrical Distribution Systems, or a successor proceeding, whether its existing policies, procedures, and rules should be revised or enhanced to augment the safety and reliability of the electrical distribution system. This determination shall consider, but not be limited to, all of the following:
(i)Enhancements or updates to annual reliability reports, including, but not limited to, reliability statistics of census tracts or other jurisdictions.
(ii)Data or statistics to aid the commissions understanding of whether there are patterns of electrical outages that disproportionately affect tribal governments or rural, disadvantaged, or low-income communities.
(iii)Updates to General Order 166 for purposes of reliability thresholds and reporting requirements.
(B)The determination made by the commission pursuant to this paragraph does not affect the obligations of a local publicly owned electric utility pursuant to Section 9540.
(5)The electrical corporation shall conspicuously post on its internet website the annual reliability report required pursuant to Decision 96-09-045, as amended, or a decision that supersedes Decision 96-09-045.
(b)(1)The commission shall use the information contained in an electrical corporations annual reliability report to require cost-effective remediation of reliability deficiencies if the report, or more than one report, identifies repeated deficiencies in the same local area as determined by the commission pursuant to paragraph (1) of subdivision (a). In requiring cost-effective remediation, the commission shall consult with the electrical corporation and consider mitigating factors that may impede an electrical corporation from implementing required cost-effective remediation, including, but not limited to, local permitting matters or other events or conditions or public policy considerations that may present higher priority safety or reliability issues.
(2)The commission may suspend the requirements of paragraph (1) if the commission finds that expenditures by the electrical corporation to comply with that paragraph are not justified or that the remediation measures undertaken by the electrical corporation are not effective at improving reliability.
(c)(1)The commission may order an electrical corporation to make more frequent trend analyses of local area service reliability and to make those analyses publicly available.
(2)The information made publicly available shall provide sufficient confidentiality for purposes of protecting electrical system security.
(3)The commission may make those analyses publicly available.
SEC. 2.Section 8387.2 is added to the Public Utilities Code, to read:8387.2.(a)For purposes of this section, access and functional needs population has the same meaning as set forth in Section 8593.3 of the Government Code.
(b)Each electrical corporation shall work with representatives of state agencies and community-based organizations that serve, or advocate on behalf of, or both serve and advocate on behalf of, an access and functional needs population to develop and make publicly available a plan to support the access and functional needs population during a deenergization event, consistent with the commissions orders regarding deenergization.
(c)An electrical corporation shall submit the plan developed pursuant to subdivision (b) to the commission.
SEC. 3.Section 8387.4 is added to the Public Utilities Code, to read:8387.4.(a)After each deenergization event, an electrical corporation shall prepare a post-deenergization event report on the deenergization event that complies with the commissions reporting requirements established in a proceeding pursuant to Rulemaking 18-12-005 (December 19, 2018), Order Instituting Rulemaking to Examine Electric Utility De-Energization of Power Lines in Dangerous Conditions, or a successor proceeding, and any additional requirements determined by the Safety and Enforcement Division of the commission.
(b)On or before January 1, 2027, the commission shall determine whether the post-deenergization event report provided by an electrical corporation should include either of the following:
(1)Geospatial data on the locations of any circuit or circuit segments involved in the deenergization event mapped onto the service territory of the reporting entity and statistics describing the census tract-level impacts of the deenergization event to provide for a comparison of severity of the impacts caused by the deenergization event based on locations and populations affected.
(2)Information regarding the deenergization event disaggregated by census tract and whether the census tract is a disadvantaged community, as identified pursuant to Section 39711 of the Health and Safety Code.
(c)A report prepared pursuant to this section shall be filed, served, and distributed in accordance with the commissions requirements established through a proceeding pursuant to Rulemaking 18-12-005 (December 19, 2018), Order Instituting Rulemaking to Examine Electric Utility De-Energization of Power Lines in Dangerous Conditions, or a successor proceeding. The report shall also be provided to the locally elected body and the city manager or the chief administrative officer of the cities and counties affected by the deenergization event to allow those local public entities to understand the location and scale of deenergization event impacts and to make appropriate decisions accordingly. The report shall be published and made publicly available on the electrical corporations internet website. The report shall be updated each year and submitted to the commission.
SEC. 4.Part 4 (commencing with Section 9540) is added to Division 4.8 of the Public Utilities Code, to read:4.Reliability9540.(a)A local publicly owned electric utility shall prepare and make publicly available, by posting conspicuously on its internet website, an annual reliability report that identifies, but is not limited to, the frequency and duration of interruptions in services. The report may include any of the following information:
(1)System- and division-level reliability, if relevant to that utilitys system.
(2)Reliability statistics at census tracts or smaller resolutions.
(3)Reliability statistics for customers that receive a form of financial assistance, including, but not limited to, enrollment in an income-qualifying rate assistance program or assistance program for energy allowances related to medical necessity.
(b)The reliability metrics described in subdivision (a) shall be reported with the worst performing circuits and shall include major event days.
(c)(1)The local publicly owned electric utility shall submit the annual reliability report to the Energy Commission.
(2)The information made publicly available shall provide sufficient confidentiality for purposes of protecting electrical system security.
SEC. 5.The Legislature finds and declares that Section 4 of this act, which adds Section 9540 to the Public Utilities Code, imposes a limitation on the publics right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article I of the California Constitution. Pursuant to that constitutional provision, the Legislature makes the following findings to demonstrate the interest protected by this limitation and the need for protecting that interest:
To protect electrical system security, it is necessary to limit the public disclosure of information related to the security of the electrical system and for that information to be provided with sufficient confidentiality.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)The commission shall require an electrical corporation to include in an annual reliability report, required pursuant to Decision 96-09-045, as amended, or a decision that supersedes Decision 96-09-045, information on the reliability of service to end use customers that identifies, but is not limited to, the frequency and duration of interruptions in services. This information shall indicate areas with both the most frequent and longest outages, using local areas determined by the commission. The commission, in consultation with the electrical corporation, shall ensure that the geographical boundaries of local areas do not split up circuits for reporting purposes, if the electrical corporation aggregates data by circuits. The information shall be sufficiently aggregated to both maintain electrical system security, and be of use and relevance to affected customers of the electrical corporation.
(2)Before July 1, 2014, the commission shall determine the local areas for the purposes of paragraph (1).
(3)The requirements of paragraph (1) shall apply to annual reliability reports due after July 1, 2014.
(4)(A)On or before January 1, 2027, the commission shall, in a new or existing proceeding, determine whether the annual reliability reports should include any of the following information: shall determine, as part of the proceeding in Rulemaking 24-05-023 (June 6, 2024), Order Instituting Rulemaking to Update Rules for the Safety, Reliability, and Resiliency of Electrical Distribution Systems, or a successor proceeding, whether its existing policies, procedures, and rules should be revised or enhanced to augment the safety and reliability of the electrical distribution system. This determination shall consider, but not be limited to, all of the following:
(i)System- and division-level reliability.(ii)Reliability statistics at census tracts or smaller resolutions.(iii)Reliability statistics for customers that receive a form of financial assistance, including, but not limited to, enrollment in the California Alternate Rates for Energy (CARE) program, enrollment in the Family Electric Rate Assistance (FERA) program, or receiving a medical baseline allowance.(B)The reliability metrics described in subparagraph (A) shall be reported with the worst performing circuits and shall include major event days.(i)Enhancements or updates to annual reliability reports, including, but not limited to, reliability statistics of census tracts or other jurisdictions.
(ii)Data or statistics to aid the commissions understanding of whether there are patterns of electrical outages that disproportionately affect tribal governments or rural, disadvantaged, or low-income communities.
(iii)Updates to General Order 166 for purposes of reliability thresholds and reporting requirements.
(C)(B)The determination made by the commission pursuant to this paragraph does not affect the obligations of a local publicly owned electric utility pursuant to Section 9540.
(5)The electrical corporation shall conspicuously post on its internet website the annual reliability report required pursuant to Decision 96-09-045, as amended, or a decision that supersedes Decision 96-09-045.
(b)(1)The commission shall use the information contained in an electrical corporations annual reliability report to require cost-effective remediation of reliability deficiencies if the report, or more than one report, identifies repeated deficiencies in the same local area as determined by the commission pursuant to paragraph (1) of subdivision (a). In requiring cost-effective remediation, the commission shall consult with the electrical corporation and consider mitigating factors that may impede an electrical corporation from implementing required cost-effective remediation, including, but not limited to, local permitting matters or other events or conditions or public policy considerations that may present higher priority safety or reliability issues.
(2)The commission may suspend the requirements of paragraph (1) if the commission finds that expenditures by the electrical corporation to comply with that paragraph are not justified or that the remediation measures undertaken by the electrical corporation are not effective at improving reliability.
(c)(1)The commission may order an electrical corporation to make more frequent trend analyses of local area service reliability and to make those analyses publicly available.
(2)The information made publicly available shall provide sufficient confidentiality for purposes of protecting electrical system security.
(3)The commission may make those analyses publicly available.
SEC. 2.Section 8387.2 is added to the Public Utilities Code, to read:8387.2.(a)For purposes of this section, access and functional needs population has the same meaning as set forth in Section 8593.3 of the Government Code.
(b)Each electrical corporation shall work with representatives of state agencies and community-based organizations that serve, or advocate on behalf of, or both serve and advocate on behalf of, an access and functional needs population to develop and make publicly available a plan to support the access and functional needs population during a deenergization event, consistent with the commissions orders regarding deenergization.
(c)An electrical corporation shall submit the plan developed pursuant to subdivision (b) to the commission.
SEC. 3.Section 8387.4 is added to the Public Utilities Code, to read:8387.4.(a)After each deenergization event, an electrical corporation shall prepare a post-deenergization event report on the deenergization event that contains all of the following: complies with the commissions reporting requirements established in a proceeding pursuant to Rulemaking 18-12-005 (December 19, 2018), Order Instituting Rulemaking to Examine Electric Utility De-Energization of Power Lines in Dangerous Conditions, or a successor proceeding, and any additional requirements determined by the Safety and Enforcement Division of the commission.
(1)The time, place, and duration of the deenergization event.(2)The number of affected customers, including a breakdown of both of the following:(A)The type of customer, including, but not limited to, residential, commercial, or industrial.(B)The number of customers who receive a form of financial assistance, including, but not limited to, either of the following:(i)Enrollment in the California Alternate Rates for Energy (CARE) program, the Family Electric Rate Assistance (FERA) program, or another low-income customer rate program.(ii)Receiving a medical baseline allowance or enrollment in a life-supporting equipment program.(b)On or before January 1, 2027, the commission shall determine whether the post-deenergization event report provided by an electrical corporation should include either of the following:
(1)Geospatial data on the locations of any circuit or circuit segments involved in the deenergization event mapped onto the service territory of the reporting entity and statistics describing the census tract-level impacts of the deenergization event to provide for a comparison of severity of the impacts caused by the deenergization event based on locations and populations affected.
(2)Information regarding the deenergization event disaggregated by census tract and whether the census tract is a disadvantaged community, as identified pursuant to Section 39711 of the Health and Safety Code.
(c)A report prepared pursuant to this section shall be filed, served, and distributed in accordance with the commissions requirements established through a proceeding pursuant to Rulemaking 18-12-005 (December 19, 2018), Order Instituting Rulemaking to Examine Electric Utility De-Energization of Power Lines in Dangerous Conditions, or a successor proceeding. The report shall also be provided to the locally elected body and the city manager or the chief administrative officer of the cities and counties affected by the deenergization event to allow those local public entities to understand the location and scale of deenergization event impacts and to make appropriate decisions accordingly. The report shall be published and made publicly available on the electrical corporations internet website. The report shall be updated each year and submitted to the commission.
SEC. 4.Part 4 (commencing with Section 9540) is added to Division 4.8 of the Public Utilities Code, to read:4.Reliability9540.(a)A local publicly owned electric utility shall prepare and make publicly available, by posting conspicuously on its internet website, an annual reliability report that identifies, but is not limited to, the frequency and duration of interruptions in services. The report may include any of the following information:
(1)System- and division-level reliability, if relevant to that utilitys system.
(2)Reliability statistics at census tracts or smaller resolutions.
(3)Reliability statistics for customers that receive a form of financial assistance, including, but not limited to, enrollment in an income-qualifying rate assistance program or assistance program for energy allowances related to medical necessity.
(b)The reliability metrics described in subdivision (a) shall be reported with the worst performing circuits and shall include major event days.
(c)(1)The local publicly owned electric utility shall submit the annual reliability report to the Energy Commission.
(2)The information made publicly available shall provide sufficient confidentiality for purposes of protecting electrical system security.
SEC. 5.The Legislature finds and declares that Section 4 of this act, which adds Section 9540 to the Public Utilities Code, imposes a limitation on the publics right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article I of the California Constitution. Pursuant to that constitutional provision, the Legislature makes the following findings to demonstrate the interest protected by this limitation and the need for protecting that interest:
To protect electrical system security, it is necessary to limit the public disclosure of information related to the security of the electrical system and for that information to be provided with sufficient confidentiality.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)The commission shall require an electrical corporation to include in an annual reliability report, required pursuant to Decision 96-09-045, as amended, or a decision that supersedes Decision 96-09-045, information on the reliability of service to end use customers that identifies, but is not limited to, the frequency and duration of interruptions in services. This information shall indicate areas with both the most frequent and longest outages, using local areas determined by the commission. The commission, in consultation with the electrical corporation, shall ensure that the geographical boundaries of local areas do not split up circuits for reporting purposes, if the electrical corporation aggregates data by circuits. The information shall be sufficiently aggregated to both maintain electrical system security, and be of use and relevance to affected customers of the electrical corporation.
(2)Before July 1, 2014, the commission shall determine the local areas for the purposes of paragraph (1).
(3)The requirements of paragraph (1) shall apply to annual reliability reports due after July 1, 2014.
(4)(A)On or before January 1, 2027, the commission shall, in a new or existing proceeding, determine whether the annual reliability reports should include any of the following information:
(i)System- and division-level reliability.
(ii)Reliability statistics at census tracts or smaller resolutions.
(iii)Reliability statistics for customers that receive a form of financial assistance, including, but not limited to, enrollment in the California Alternate Rates for Energy (CARE) program, enrollment in the Family Electric Rate Assistance (FERA) program, or receiving a medical baseline allowance.
(B)The reliability metrics described in subparagraph (A) shall be reported with the worst performing circuits and shall include major event days.
(C)The determination made by the commission pursuant to this paragraph does not affect the obligations of a local publicly owned electric utility pursuant to Section 9540.
(5)The electrical corporation shall conspicuously post on its internet website the annual reliability report required pursuant to Decision 96-09-045, as amended, or a decision that supersedes Decision 96-09-045.
(b)(1)The commission shall use the information contained in an electrical corporations annual reliability report to require cost-effective remediation of reliability deficiencies if the report, or more than one report, identifies repeated deficiencies in the same local area as determined by the commission pursuant to paragraph (1) of subdivision (a). In requiring cost-effective remediation, the commission shall consult with the electrical corporation and consider mitigating factors that may impede an electrical corporation from implementing required cost-effective remediation, including, but not limited to, local permitting matters or other events or conditions or public policy considerations that may present higher priority safety or reliability issues.
(2)The commission may suspend the requirements of paragraph (1) if the commission finds that expenditures by the electrical corporation to comply with that paragraph are not justified or that the remediation measures undertaken by the electrical corporation are not effective at improving reliability.
(c)(1)The commission may order an electrical corporation to make more frequent trend analyses of local area service reliability and to make those analyses publicly available.
(2)The information made publicly available shall provide sufficient confidentiality for purposes of protecting electrical system security.
(3)The commission may make those analyses publicly available.
SEC. 2.Section 8387.2 is added to the Public Utilities Code, to read:8387.2.(a)For purposes of this section, access and functional needs population consists of individuals who have developmental or intellectual disabilities, physical disabilities, chronic conditions, injuries, and who have limited English proficiency or are non-English speaking, and who are seniors, children, living in institutionalized settings, low income, homeless, or transportation disadvantaged, including, but not limited to, individuals who are dependent on public transit or pregnant. has the same meaning as set forth in Section 8593.3 of the Government Code.
(b)Each electrical corporation shall work with persons from the representatives of state agencies and community-based organizations that serve, or advocate on behalf of, or both serve and advocate on behalf of, an access and functional needs population to develop and make publicly available a plan to support the access and functional needs population during a deenergization event, consistent with the commissions orders regarding deenergization.
(c)An electrical corporation shall submit the plan developed pursuant to subdivision (b) to the commission.
SEC. 3.Section 8387.4 is added to the Public Utilities Code, to read:8387.4.(a)After each deenergization event, an electrical corporation shall prepare a post-deenergization event report on the deenergization event that contains all of the following:
(1)The time, place, and duration of the deenergization event.
(2)The number of affected customers, including a breakdown of both of the following:
(A)The type of customer, including, but not limited to, residential, commercial, or industrial.
(B)The number of customers who receive a form of financial assistance, including, but not limited to, by either of the following:
(i)Enrollment in the California Alternate Rates for Energy (CARE) program, the Family Electric Rate Assistance (FERA) program, or another low-income customer rate program.
(ii)Receiving a medical baseline allowance or enrollment in a life-supporting equipment program.
(b)On or before January 1, 2027, the commission shall determine whether the post-deenergization event report provided by an electrical corporation should include either of the following:
(1)Geospatial data on the locations of any circuit or circuit segments involved in the deenergization event mapped onto the service territory of the reporting entity and statistics describing the census tract-level impacts of the deenergization event to provide for a comparison of severity of the impacts caused by the deenergization event based on locations and populations affected.
(2)Information regarding the deenergization event disaggregated by census tract and whether the census tract is a disadvantaged community, as identified pursuant to Section 39711 of the Health and Safety Code.
(c)The A report prepared pursuant to this section shall be provided to the locally elected body and the city manager or the chief administrative officer of the cities and counties affected by the deenergization event to allow those local public entities to understand the location and scale of deenergization event impacts and to make appropriate decisions accordingly. The report shall be updated each year and submitted by the Energy Commission. to the commission.
SEC. 4.Part 4 (commencing with Section 9540) is added to Division 4.8 of the Public Utilities Code, to read:4 4.Reliability9540.(a)A local publicly owned electric utility shall prepare and make publicly available available, by posting conspicuously on its internet website website, an annual reliability report that is equivalent to the report required to be prepared by an electrical corporation pursuant to Section 2774.1. identifies, but is not limited to, the frequency and duration of interruptions in services. The report may include any of the following information:
(1)System- and division-level reliability, if relevant to that utilitys system.
(2)Reliability statistics at census tracts or smaller resolutions.
(3)Reliability statistics for customers that receive a form of financial assistance, including, but not limited to, enrollment in an income-qualifying rate assistance program or assistance program for energy allowances related to medical necessity.
(b)The reliability metrics described in subdivision (a) shall be reported with the worst performing circuits and shall include major event days.
(c)(1)The local publicly owned electric utility shall submit the annual reliability report to the Energy Commission.
(2)The information made publicly available shall provide sufficient confidentiality for purposes of protecting electrical system security.
SEC. 5.The Legislature finds and declares that Section 4 of this act, which adds Section 9540 to the Public Utilities Code, imposes a limitation on the publics right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article I of the California Constitution. Pursuant to that constitutional provision, the Legislature makes the following findings to demonstrate the interest protected by this limitation and the need for protecting that interest:
To protect electrical system security, it is necessary to limit the public disclosure of information related to the security of the electrical system and for that information to be provided with sufficient confidentiality.
SEC. 5.SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)The commission shall require an electrical corporation to include in an annual reliability report, required pursuant to Decision 96-09-045, as amended, or a decision that supersedes Decision 96-09-045, information on the reliability of service to end use customers that identifies, but is not limited to, the frequency and duration of interruptions in services. This information shall indicate areas with both the most frequent and longest outages, using local areas determined by the commission. The commission, in consultation with the electrical corporation, shall ensure that the geographical boundaries of local areas do not split up circuits for reporting purposes, if the electrical corporation aggregates data by circuits. The information shall be sufficiently aggregated to both maintain electrical system security, and be of use and relevance to affected customers of the electrical corporation.
(2)Before July 1, 2014, the commission shall determine the local areas for the purposes of paragraph (1).
(3)The requirements of paragraph (1) shall apply to annual reliability reports due after July 1, 2014.
(4)(A)On and after or before January 1, 2026, 2027, the commission shall, in a new or existing proceeding, determine whether the annual reliability reports shall should include all any of the following information:
(i)System- and division-level reliability.
(ii)Reliability statistics at census tracts or smaller resolutions.
(iii)Reliability statistics for customers that receive a form of financial assistance, including, but not limited to, enrollment in the California Alternate Rates for Energy (CARE) program, enrollment in the Family Electric Rate Assistance (FERA) program, or receiving a medical baseline allowance.
(B)The reliability metrics described in subparagraph (A) shall be reported with the worst performing circuits and shall include major event days.
(C)The determination made by the commission pursuant to this paragraph does not affect the obligations of a local publicly owned electric utility pursuant to Section 9540.
(5)The electrical corporation shall conspicuously post on its internet website the annual report required pursuant to Decision 96-09-045, as amended, or a decision that supersedes Decision 96-09-045.
(b)(1)The commission shall use the information contained in an electrical corporations annual reliability report to require cost-effective remediation of reliability deficiencies if the report, or more than one report, identifies repeated deficiencies in the same local area as determined by the commission pursuant to paragraph (1) of subdivision (a). In requiring cost-effective remediation, the commission shall consult with the electrical corporation and consider mitigating factors that may impede an electrical corporation from implementing required cost-effective remediation, including, but not limited to, local permitting matters or other events or conditions or public policy considerations that may present higher priority safety or reliability issues.
(2)The commission may suspend the requirements of paragraph (1) if the commission finds that expenditures by the electrical corporation to comply with that paragraph are not justified or that the remediation measures undertaken by the electrical corporation are not effective at improving reliability.
(c)(1)The commission may order an electrical corporation to make more frequent trend analyses of local area service reliability and to make those analyses publicly available.
(2)The information made publicly available shall provide sufficient confidentiality for purposes of protecting electrical system security.
(3)The commission may make those analyses publicly available.
SEC. 2.Section 8387.2 is added to the Public Utilities Code, to read:8387.2.(a)For purposes of this section, access and functional needs population consists of individuals who have developmental or intellectual disabilities, physical disabilities, chronic conditions, injuries, and who have limited English proficiency or are non-English speaking, and who are seniors, children, living in institutionalized settings, low income, homeless, or transportation disadvantaged, including, but not limited to, individuals who are dependent on public transit or pregnant.
(b)Each electrical corporation, local publicly owned electric utility, or electrical cooperative corporation shall work with persons from the access and functional needs population to develop and make publicly available a plan to support the access and functional needs population during a deenergization event. event, consistent with the commissions orders regarding deenergization.
(c)(1)An electrical corporation shall submit the plan developed pursuant to subdivision (b) to the commission.
(2)A local publicly owned electric utility shall submit the plan developed pursuant to subdivision (b) to the Energy Commission.(3)An electrical cooperative shall submit the plan developed pursuant to subdivision (b) to the Energy Commission.SEC. 3.Section 8387.4 is added to the Public Utilities Code, to read:8387.4.(a)After each deenergization event, an electrical corporation, local publicly owned electric utility, or electrical cooperative, as appropriate, corporation shall prepare a post-deenergization event report on the deenergization event that provides geospatial contains all of the following:
(1)The time, place, and duration of the deenergization event.
(2)The number of affected customers, including a breakdown of both of the following:
(A)The type of customer, including, but not limited to, residential, commercial, or industrial.
(B)The number of customers who receive a form of financial assistance, including, but not limited to, by either of the following:
(i)Enrollment in the California Alternate Rates for Energy (CARE) program, the Family Electric Rate Assistance (FERA) program, or another low-income customer rate program.
(ii)Receiving a medical baseline allowance or enrollment in a life-supporting equipment program.
(b)On or before January 1, 2027, the commission shall determine whether the post-deenergization event report provided by an electrical corporation should include either of the following:
(1)Geospatial data on the locations of any circuit or circuit segments involved in the deenergization event mapped onto the service territory of the reporting entity and statistics describing the census tract-level impacts of the deenergization event to provide for a comparison of severity of the impacts caused by the deenergization event based on locations and populations affected.
(b)The report shall include all of the following information regarding the deenergization event:(1)The time, place, and duration of the deenergization event.(2)The number of affected customers, including a breakdown of all of the following:(A)The type of customer, including, but not limited to, residential, commercial, or industrial.(B)The number of customers who receive a form of financial assistance, including, but not limited to, by either of the following:(i)Enrollment in the California Alternate Rates for Energy (CARE) program, the Family Electric Rate Assistance (FERA) program, or another low-income customer rate program.(ii)Receiving a medical baseline allowance or enrollment in a life-supporting equipment program.(C)Disaggregation(2)Information regarding the deenergization event disaggregated by census tract and whether the census tract is a disadvantaged community, as identified pursuant to Section 39711 of the Health and Safety Code.
(c)The report prepared pursuant to this section shall be provided to the locally elected body and the city manager or the chief administrative officer of the cities and counties affected by the deenergization event to allow those local public entities to understand the location and scale of deenergization event impacts and to make appropriate decisions accordingly. The report shall be updated each year and submitted by the Energy Commission.
SEC. 4.Section 8388.5 of the Public Utilities Code is amended to read:8388.5.(a)The commission shall establish an expedited utility distribution infrastructure undergrounding program consistent with this section.(b)Only a large electrical corporation may participate in the program.(c)In order to participate in the program, a large electrical corporation shall submit to the office a distribution infrastructure undergrounding plan that shall address or include, at minimum, all of the following components:(1)A 10-year plan for undergrounding distribution infrastructure.(2)Identification of the undergrounding projects that will be constructed as part of the program, including a means of prioritizing undergrounding projects based on wildfire risk reduction, public safety, cost efficiency, and reliability benefits. Only undergrounding projects located in tier 2 or 3 high fire-threat districts or rebuild areas may be considered and constructed as part of the program.(3)Timelines for the completion of identified and prioritized undergrounding projects, and unit cost targets and mileage completion targets for each year covered by the plan.(4)A comparison of undergrounding versus aboveground hardening of electrical infrastructure and wildfire mitigation for achieving comparable risk reduction, or any other alternative mitigation strategy, such as covered conductor and rapid earth fault current limiter devices, for those prioritized undergrounding projects, evaluating the scope, cost, extent, and risk reduction of each activity, separately and collectively, over the duration of the plan. The comparison shall emphasize risk reduction and include an analysis of the cost of each activity for reducing wildfire risk, separately and collectively, over the duration of the plan.(5)A plan for utility and contractor workforce development.(6)An evaluation of project costs, projected economic benefits over the life of the assets, and any cost containment assumptions, including the economies of scale necessary to reduce wildfire risk and mitigation costs and establish a sustainable supply chain.(d)Upon a large electrical corporation submitting a plan to the office, the office shall do both of the following:(1)Publish the plan on the offices internet website for public comment.(2)Within nine months, review and approve or deny the plan. The office may only approve the plan if the large electrical corporation has shown that the plan will substantially increase electrical reliability by reducing the use of public safety power shutoffs, enhanced powerline safety settings, deenergization events, and any other outage programs, and substantially reduce the risk of wildfire. Before approving the plan, the office may require the large electrical corporation to modify the plan.(e)(1)Upon the office approving a plan pursuant to paragraph (2) of subdivision (d), the large electrical corporation shall, within 60 days, submit to the commission a copy of the plan and an application requesting review and conditional approval of the plans costs and including all of the following:(A)Any substantial improvements in safety risk and reduction in costs compared to other hardening and risk mitigation measures over the duration of the plan.(B)The cost targets, at a minimum, that result in feasible and attainable cost reductions as compared to the large electrical corporations historical undergrounding costs.(C)How the cost targets are expected to decline over time due to cost efficiencies and economies of scale.(D)A strategy for achieving cost reductions over time.(2)The assigned commissioner may waive the requirements of subdivisions (b), (d), (f), and (i) of Section 1701.3 for an application submitted to the commission pursuant to paragraph (1).(3)In reviewing an application submitted to the commission pursuant to paragraph (1), the commission shall consider not revisiting cost or mileage completion targets approved, or pending approval, in the electrical corporations general rate case or a commission-approved balancing account ratemaking mechanism for system hardening.(4)Upon the commission receiving an application pursuant to paragraph (1), the commission shall facilitate a public workshop for presentation of the plan and take public comment for at least 30 days.(5)On or before nine months, the commission shall review and approve or deny the application. Before approving the application, the commission may require the large electrical corporation to modify or modify and resubmit the application.(6)The commission shall consider continuing an existing commission-approved balancing account ratemaking mechanism for system hardening for the duration of a plan, as determined by the commission, and shall authorize recovery of recorded costs that are determined to be just and reasonable.(f)If the plan is approved by the office and commission, the large electrical corporation shall do all of the following:(1)Every six months, file a progress report with the office and the commission. The large electrical corporation and the office shall publish these progress reports on their internet websites.(2)Include ongoing work plans and progress in annual wildfire mitigation plan filings.(3)Hire an independent monitor, selected by the office, to review and assess the large electrical corporations compliance with its plan and submit a report with the office each December 1 over the course of the plan.(g)(1)In reviewing and assessing the large electrical corporations compliance with its plan pursuant to paragraph (3) of subdivision (f), the independent monitor shall assess whether the large electrical corporations progress on undergrounding work has been consistent with the objectives identified in its plan. The independent monitors report shall specify any failure, delays, or shortcomings of the large electrical corporation and provide recommendations for improvements to accomplish the objectives set forth in the plan.(2)The large electrical corporation shall have 180 days to correct and eliminate any deficiency specified in the independent monitors report.(3)On or before December 1 of each year the plan is in effect, the independent monitor shall submit the report to the office.(h)The office shall publish reports received pursuant to paragraph (3) of subdivision (g) on its internet website.(i)(1)The office shall consider the independent monitors report and whether the large electrical corporation has cured any deficiencies, and may recommend penalties to the commission.(2)The commission may assess penalties on a large electrical corporation that fails to substantially comply with a commission decision approving its plan.(j)Each large electrical corporation participating in the program shall apply for available federal, state, and other nonratepayer moneys throughout the duration of its approved undergrounding plan, and any moneys received as a result of those applications shall be used to reduce the programs costs on the large electrical corporations ratepayers.SEC. 5.Part 3 (commencing with Section 9530) is added to Division 4.8 of the Public Utilities Code, to read:3.Reliability9530.SEC. 4.Part 4 (commencing with Section 9540) is added to Division 4.8 of the Public Utilities Code, to read:4Reliability9530.9540.(a)A local publicly owned electric utility shall prepare and make publicly available on its internet website an annual reliability report that is equivalent to the report required to be prepared by an electrical corporation pursuant to Section 2774.1. The report shall may include all any of the following information:
(1)System- and division-level reliability. reliability, if relevant to that utilitys system.
(2)Reliability statistics at census tracts or smaller resolutions.
(3)Reliability statistics for customers that receive a form of financial assistance, including, but not limited to, enrollment in the California Alternate Rates for Energy (CARE) program, enrollment in the Family Electric Rate Assistance (FERA) program, or receiving a medical baseline allowance. an income-qualifying rate assistance program or assistance program for energy allowances related to medical necessity.
(b)The reliability metrics described in subdivision (a) shall be reported with the worst performing circuits and shall include major event days.
SEC. 6.SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)The commission shall require an electrical corporation to include in an annual reliability report, required pursuant to Decision 96-09-045, as amended, or a decision that supersedes Decision 96-09-045, information on the reliability of service to end use customers that identifies, but is not limited to, the frequency and duration of interruptions in services. This information shall indicate areas with both the most frequent and longest outages, using local areas determined by the commission. The commission, in consultation with the electrical corporation, shall ensure that the geographical boundaries of local areas do not split up circuits for reporting purposes, if the electrical corporation aggregates data by circuits. The information shall be sufficiently aggregated to both maintain electrical system security, and be of use and relevance to affected customers of the electrical corporation.
(2)Before July 1, 2014, the commission shall determine the local areas for the purposes of paragraph (1).
(3)The requirements of paragraph (1) shall apply to annual reliability reports due after July 1, 2014.
(4)(A)On and after January 1, 2026, the annual reliability reports shall focus on system- include all of the following information:
(i)System- and division-level reliability and census reliability.
(ii)Reliability statistics at census tracts or neighborhoods within them. The smaller resolutions.
(iii)Reliability statistics for customers that receive a form of financial assistance, including, but not limited to, enrollment in the California Alternate Rates for Energy (CARE) program, enrollment in the Family Electric Rate Assistance (FERA) program, or receiving a medical baseline allowance.
(B)The reliability metrics described in subparagraph (A) shall be reported with the worst performing circuits and shall include major event days.
(5)The electrical corporation shall conspicuously post on its internet website the annual report required pursuant to Decision 96-09-045, as amended, or a decision that supersedes Decision 96-09-045.
(b)(1)The commission shall use the information contained in an electrical corporations annual reliability report to require cost-effective remediation of reliability deficiencies if the report, or more than one report, identifies repeated deficiencies in the same local area as determined by the commission pursuant to paragraph (1) of subdivision (a). In requiring cost-effective remediation, the commission shall consult with the electrical corporation and consider mitigating factors that may impede an electrical corporation from implementing required cost-effective remediation, including, but not limited to, local permitting matters or other events or conditions or public policy considerations that may present higher priority safety or reliability issues.
(2)The commission may suspend the requirements of paragraph (1) if the commission finds that expenditures by the electrical corporation to comply with that paragraph are not justified or that the remediation measures undertaken by the electrical corporation are not effective at improving reliability.
(c)(1)The commission may order an electrical corporation to make more frequent trend analyses of local area service reliability and to make those analyses publicly available.
(2)The information made publicly available shall provide sufficient confidentiality for purposes of protecting electrical system security.
(3)The commission may make those analyses publicly available.
SEC. 2.Section 8387.2 is added to the Public Utilities Code, to read:8387.2.(a)For purposes of this section, access and functional needs population consists of individuals who have developmental or intellectual disabilities, physical disabilities, chronic conditions, injuries, and who have limited English proficiency or are non-English speaking, and who are seniors, children, living in institutionalized settings, low income, homeless, or transportation disadvantaged, including, but not limited to, individuals who are dependent on public transit or pregnant.
(b)Each electrical corporation, local publicly owned electric utility, or electrical cooperative shall work with persons from the access and functional needs population to develop and make publicly available a plan to support the access and functional needs populations population during a deenergization event.
(c)(1)An electrical corporation shall submit the plan developed pursuant to subdivision (b) to the commission.
(2)A local publicly owned electric utility shall submit the plan developed pursuant to subdivision (b) to the Energy Commission.
(3)An electrical cooperative shall submit the plan developed pursuant to subdivision (b) to the Energy Commission.
SEC. 3.Section 8387.4 is added to the Public Utilities Code, to read:8387.4.(a)After each deenergization event, an electrical corporation, local publicly owned electric utility, or electrical cooperative, as appropriate, shall prepare a report on the deenergization event that provides granular geospatial data on the locations of any circuit or circuit segments involved in the deenergization event mapped onto the service territory of the reporting entity and statistics describing the census tract-level impacts of the deenergization event to provide for a comparison of severity of the impacts caused by the deenergization event based on locations and populations affected.
(b)The report shall include all of the following information on customers impacted by regarding the deenergization event:
(1)Whether the impacted customers are residential or commercial.(2)Whether the impacted customers are low-income or part of a disadvantaged community.(3)The demographic or socioeconomic information of impacted customers.(1)The time, place, and duration of the deenergization event.
(2)The number of affected customers, including a breakdown of all of the following:
(A)The type of customer, including, but not limited to, residential, commercial, or industrial.
(B)The number of customers who receive a form of financial assistance, including, but not limited to, by either of the following:
(i)Enrollment in the California Alternate Rates for Energy (CARE) program, the Family Electric Rate Assistance (FERA) program, or another low-income customer rate program.
(ii)Receiving a medical baseline allowance or enrollment in a life-supporting equipment program.
(C)Disaggregation by census tract and whether the census tract is a disadvantaged community, as identified pursuant to Section 39711 of the Health and Safety Code.
(c)The report prepared pursuant to this section shall be provided to the locally elected body and the city manager or the chief administrative officer of the cities and counties affected by the deenergization event to allow those local public entities to understand the census tracts risk profile for location and scale of deenergization events event impacts and to make appropriate decisions accordingly. The report shall be updated each year and submitted by the Energy Commission.
SEC. 4.Section 8388.5 of the Public Utilities Code is amended to read:8388.5.(a)The commission shall establish an expedited utility distribution infrastructure undergrounding program consistent with this section.
(b)Only a large electrical corporation may participate in the program.
(c)In order to participate in the program, a large electrical corporation shall submit to the office a distribution infrastructure undergrounding plan that shall address or include, at minimum, all of the following components:
(1)A 10-year plan for undergrounding distribution infrastructure.
(2)Identification of the undergrounding projects that will be constructed as part of the program, including a means of prioritizing undergrounding projects based on wildfire risk reduction, public safety, cost efficiency, and reliability benefits. Only undergrounding projects located in tier 2 or 3 high fire-threat districts or rebuild areas may be considered and constructed as part of the program.
(3)Timelines for the completion of identified and prioritized undergrounding projects, and unit cost targets and mileage completion targets for each year covered by the plan.
(4)A comparison of undergrounding versus aboveground hardening of electrical infrastructure and wildfire mitigation for achieving comparable risk reduction, or any other alternative mitigation strategy, such as covered conductor and rapid earth fault current limiter devices, for those prioritized undergrounding projects, evaluating the scope, cost, extent, and risk reduction of each activity, separately and collectively, over the duration of the plan. The comparison shall emphasize risk reduction and include an analysis of the cost of each activity for reducing wildfire risk, separately and collectively, over the duration of the plan.
(5)A plan for utility and contractor workforce development.
(6)An evaluation of project costs, projected economic benefits over the life of the assets, and any cost containment assumptions, including the economies of scale necessary to reduce wildfire risk and mitigation costs and establish a sustainable supply chain.
(d)Upon a large electrical corporation submitting a plan to the office, the office shall do both of the following:
(1)Publish the plan on the offices internet website for public comment.
(2)Within nine months, review and approve or deny the plan. The office may only approve the plan if the large electrical corporation has shown that the plan will substantially increase electrical reliability by reducing the use of public safety power shutoffs, enhanced powerline safety settings, deenergization events, and any other outage programs, and substantially reduce the risk of wildfire. Before approving the plan, the office may require the large electrical corporation to modify the plan.
(e)(1)Upon the office approving a plan pursuant to paragraph (2) of subdivision (d), the large electrical corporation shall, within 60 days, submit to the commission a copy of the plan and an application requesting review and conditional approval of the plans costs and including all of the following:
(A)Any substantial improvements in safety risk and reduction in costs compared to other hardening and risk mitigation measures over the duration of the plan.
(B)The cost targets, at a minimum, that result in feasible and attainable cost reductions as compared to the large electrical corporations historical undergrounding costs.
(C)How the cost targets are expected to decline over time due to cost efficiencies and economies of scale.
(D)A strategy for achieving cost reductions over time.
(2)The assigned commissioner may waive the requirements of subdivisions (b), (d), (f), and (i) of Section 1701.3 for an application submitted to the commission pursuant to paragraph (1).
(3)In reviewing an application submitted to the commission pursuant to paragraph (1), the commission shall consider not revisiting cost or mileage completion targets approved, or pending approval, in the electrical corporations general rate case or a commission-approved balancing account ratemaking mechanism for system hardening.
(4)Upon the commission receiving an application pursuant to paragraph (1), the commission shall facilitate a public workshop for presentation of the plan and take public comment for at least 30 days.
(5)On or before nine months, the commission shall review and approve or deny the application. Before approving the application, the commission may require the large electrical corporation to modify or modify and resubmit the application.
(6)The commission shall consider continuing an existing commission-approved balancing account ratemaking mechanism for system hardening for the duration of a plan, as determined by the commission, and shall authorize recovery of recorded costs that are determined to be just and reasonable.
(f)If the plan is approved by the office and commission, the large electrical corporation shall do all of the following:
(1)Every six months, file a progress report with the office and the commission. The large electrical corporation and the office shall publish these progress reports on their internet websites.
(2)Include ongoing work plans and progress in annual wildfire mitigation plan filings.
(3)Hire an independent monitor, selected by the office, to review and assess the large electrical corporations compliance with its plan and submit a report with the office each December 1 over the course of the plan.
(g)(1)In reviewing and assessing the large electrical corporations compliance with its plan pursuant to paragraph (3) of subdivision (f), the independent monitor shall assess whether the large electrical corporations progress on undergrounding work has been consistent with the objectives identified in its plan. The independent monitors report shall specify any failure, delays, or shortcomings of the large electrical corporation and provide recommendations for improvements to accomplish the objectives set forth in the plan.
(2)The large electrical corporation shall have 180 days to correct and eliminate any deficiency specified in the independent monitors report.
(3)On or before December 1 of each year the plan is in effect, the independent monitor shall submit the report to the office.
(h)The office shall publish reports received pursuant to paragraph (3) of subdivision (g) on its internet website.
(i)(1)The office shall consider the independent monitors report and whether the large electrical corporation has cured any deficiencies, and may recommend penalties to the commission.
(2)The commission may assess penalties on a large electrical corporation that fails to substantially comply with a commission decision approving its plan.
(j)Each large electrical corporation participating in the program shall apply for available federal, state, and other nonratepayer moneys throughout the duration of its approved undergrounding plan, and any moneys received as a result of those applications shall be used to reduce the programs costs on the large electrical corporations ratepayers.
SEC. 5.Part 3 (commencing with Section 9530) is added to Division 4.8 of the Public Utilities Code, to read:3.Reliability9530.(a)A local publicly owned electric utility shall prepare and make publicly available on its internet website an annual reliability report that is equivalent to the report required to be prepared by an electrical corporation pursuant to Section 2774.1. The report shall focus on system- include all of the following information:
(1)System- and division-level reliability and census reliability.
(2)Reliability statistics at census tracts or neighborhoods within them. The smaller resolutions.
(3)Reliability statistics for customers that receive a form of financial assistance, including, but not limited to, enrollment in the California Alternate Rates for Energy (CARE) program, enrollment in the Family Electric Rate Assistance (FERA) program, or receiving a medical baseline allowance.
(b)The reliability metrics described in subdivision (a) shall be reported with the worst performing circuits and shall include major event days.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)The commission shall require an electrical corporation to include in an annual reliability report, required pursuant to Decision 96-09-045, as amended, or a decision that supersedes Decision 96-09-045, information on the reliability of service to end use customers that identifies, but is not limited to, the frequency and duration of interruptions in services. This information shall indicate areas with both the most frequent and longest outages, using local areas determined by the commission. The commission, in consultation with the electrical corporation, shall ensure that the geographical boundaries of local areas do not split up circuits for reporting purposes, if the electrical corporation aggregates data by circuits. The information shall be sufficiently aggregated to both maintain electrical system security, and be of use and relevance to affected customers of the electrical corporation.
(2)Before July 1, 2014, the commission shall determine the local areas for the purposes of paragraph (1).
(3)The requirements of paragraph (1) shall apply to annual reliability reports due after July 1, 2014.
(4)On and after January 1, 2026, the annual reliability reports shall focus on system- and division-level reliability and census tracts or neighborhoods within them. The reliability metrics shall be reported with the worst performing circuits and major event days.
(4)(5)The electrical corporation shall conspicuously post on its Internet Web site internet website the annual report required pursuant to Decision 96-09-045, as amended, or a decision that supersedes Decision 96-09-045.
(b)(1)The commission shall use the information contained in an electrical corporations annual reliability report to require cost-effective remediation of reliability deficiencies if the report, or more than one report, identifies repeated deficiencies in the same local area as determined by the commission pursuant to paragraph (1) of subdivision (a). In requiring cost-effective remediation, the commission shall consult with the electrical corporation and consider mitigating factors that may impede an electrical corporation from implementing required cost-effective remediation, including, but not limited to, local permitting matters or other events or conditions or public policy considerations that may present higher priority safety or reliability issues.
(2)The commission may suspend the requirements of paragraph (1) if the commission finds that expenditures by the electrical corporation to comply with that paragraph are not justified or that the remediation measures undertaken by the electrical corporation are not effective at improving reliability.
(c)(1)The commission may order an electrical corporation to make more frequent trend analyses of local area service reliability and to make those analyses publicly available.
(2)The information made publicly available shall provide sufficient confidentiality for purposes of protecting electrical system security.
(3)The commission may make those analyses publicly available.
SEC. 2.Section 8387.2 is added to the Public Utilities Code, to read:8387.2.(a)For purposes of this section, access and functional needs population consists of individuals who have developmental or intellectual disabilities, physical disabilities, chronic conditions, injuries, and who have limited English proficiency or are non-English speaking, and who are seniors, children, living in institutionalized settings, low income, homeless, or transportation disadvantaged, including, but not limited to, individuals who are dependent on public transit or pregnant.
(b)Each electrical corporation, local publicly owned electric utility, or electrical cooperative shall develop and make publicly available a plan to support access and functional needs populations during a deenergization event.
(c)(1)An electrical corporation shall submit the plan developed pursuant to subdivision (b) to the commission.
(2)A local publicly owned electric utility shall submit the plan developed pursuant to subdivision (b) to the Energy Commission.
(3)An electrical cooperative shall submit the plan developed pursuant to subdivision (b) to the Energy Commission.
SEC. 3.Section 8387.4 is added to the Public Utilities Code, to read:8387.4.(a)After each deenergization event, an electrical corporation, local publicly owned electric utility, or electrical cooperative, as appropriate, shall prepare a report on the deenergization event that provides granular data on the locations of any circuit involved in the deenergization event mapped onto the service territory of the reporting entity and the census tract-level impacts of the deenergization event to provide for a comparison of severity of the impacts caused by the deenergization event based on locations and populations affected.
(b)The report shall include all of the following information on customers impacted by the deenergization event:
(1)Whether the impacted customers are residential or commercial.
(2)Whether the impacted customers are low-income or part of a disadvantaged community.
(3)The demographic or socioeconomic information of impacted customers.
(c)The report prepared pursuant to this section shall be provided to the cities and counties affected by the deenergization event to allow those local public entities to understand the census tracts risk profile for deenergization events and to make appropriate decisions accordingly.
SEC. 4.Section 8388.5 of the Public Utilities Code is amended to read:8388.5.(a)The commission shall establish an expedited utility distribution infrastructure undergrounding program consistent with this section.
(b)Only a large electrical corporation may participate in the program.
(c)In order to participate in the program, a large electrical corporation shall submit to the office a distribution infrastructure undergrounding plan that shall address or include, at minimum, all of the following components:
(1)A 10-year plan for undergrounding distribution infrastructure.
(2)Identification of the undergrounding projects that will be constructed as part of the program, including a means of prioritizing undergrounding projects based on wildfire risk reduction, public safety, cost efficiency, and reliability benefits. Only undergrounding projects located in tier 2 or 3 high fire-threat districts or rebuild areas may be considered and constructed as part of the program.
(3)Timelines for the completion of identified and prioritized undergrounding projects, and unit cost targets and mileage completion targets for each year covered by the plan.
(4)A comparison of undergrounding versus aboveground hardening of electrical infrastructure and wildfire mitigation for achieving comparable risk reduction, or any other alternative mitigation strategy, such as covered conductor and rapid earth fault current limiter devices, for those prioritized undergrounding projects, evaluating the scope, cost, extent, and risk reduction of each activity, separately and collectively, over the duration of the plan. The comparison shall emphasize risk reduction and include an analysis of the cost of each activity for reducing wildfire risk, separately and collectively, over the duration of the plan.
(5)A plan for utility and contractor workforce development.
(6)An evaluation of project costs, projected economic benefits over the life of the assets, and any cost containment assumptions, including the economies of scale necessary to reduce wildfire risk and mitigation costs and establish a sustainable supply chain.
(d)Upon a large electrical corporation submitting a plan to the office, the office shall do both of the following:
(1)Publish the plan on the offices internet website for public comment.
(2)Within nine months, review and approve or deny the plan. The office may only approve the plan if the large electrical corporation has shown that the plan will substantially increase electrical reliability by reducing the use of public safety power shutoffs, enhanced powerline safety settings, deenergization events, and any other outage programs, and substantially reduce the risk of wildfire. Before approving the plan, the office may require the large electrical corporation to modify the plan.
(e)(1)Upon the office approving a plan pursuant to paragraph (2) of subdivision (d), the large electrical corporation shall, within 60 days, submit to the commission a copy of the plan and an application requesting review and conditional approval of the plans costs and including all of the following:
(A)Any substantial improvements in safety risk and reduction in costs compared to other hardening and risk mitigation measures over the duration of the plan.
(B)The cost targets, at a minimum, that result in feasible and attainable cost reductions as compared to the large electrical corporations historical undergrounding costs.
(C)How the cost targets are expected to decline over time due to cost efficiencies and economies of scale.
(D)A strategy for achieving cost reductions over time.
(2)The assigned commissioner may waive the requirements of subdivisions (b), (d), (f), and (i) of Section 1701.3 for an application submitted to the commission pursuant to paragraph (1).
(3)In reviewing an application submitted to the commission pursuant to paragraph (1), the commission shall consider not revisiting cost or mileage completion targets approved, or pending approval, in the electrical corporations general rate case or a commission-approved balancing account ratemaking mechanism for system hardening.
(4)Upon the commission receiving an application pursuant to paragraph (1), the commission shall facilitate a public workshop for presentation of the plan and take public comment for at least 30 days.
(5)On or before nine months, the commission shall review and approve or deny the application. Before approving the application, the commission may require the large electrical corporation to modify or modify and resubmit the application.
(6)The commission shall consider continuing an existing commission-approved balancing account ratemaking mechanism for system hardening for the duration of a plan, as determined by the commission, and shall authorize recovery of recorded costs that are determined to be just and reasonable.
(f)If the plan is approved by the office and commission, the large electrical corporation shall do all of the following:
(1)Every six months, file a progress report with the office and the commission. The large electrical corporation and the office shall publish these progress reports on their internet websites.
(2)Include ongoing work plans and progress in annual wildfire mitigation plan filings.
(3)Hire an independent monitor, selected by the office, to review and assess the large electrical corporations compliance with its plan and submit a report with the office each December 1 over the course of the plan.
(g)(1)In reviewing and assessing the large electrical corporations compliance with its plan pursuant to paragraph (3) of subdivision (f), the independent monitor shall assess whether the large electrical corporations progress on undergrounding work has been consistent with the objectives identified in its plan. The independent monitors report shall specify any failure, delays, or shortcomings of the large electrical corporation and provide recommendations for improvements to accomplish the objectives set forth in the plan.
(2)The large electrical corporation shall have 180 days to correct and eliminate any deficiency specified in the independent monitors report.
(3)On or before December 1 of each year the plan is in effect, the independent monitor shall submit the report to the office.
(h)The office shall publish reports received pursuant to paragraph (3) of subdivision (g) on its internet website.
(i)(1)The office shall consider the independent monitors report and whether the large electrical corporation has cured any deficiencies, and may recommend penalties to the commission.
(2)The commission may assess penalties on a large electrical corporation that fails to substantially comply with a commission decision approving its plan.
(j)Each large electrical corporation participating in the program shall apply for available federal, state, and other nonratepayer moneys throughout the duration of its approved undergrounding plan, and any moneys received as a result of those applications shall be used to reduce the programs costs on the large electrical corporations ratepayers.
SEC. 5.Part 3 (commencing with Section 9530) is added to Division 4.8 of the Public Utilities Code, to read:3.Reliability9530.A local publicly owned electric utility shall prepare and make publicly available on its internet website an annual reliability report that is equivalent to the report required to be prepared by an electrical corporation pursuant to Section 2774.1. The report shall focus on system- and division-level reliability and census tracts or neighborhoods within them. The reliability metrics shall be reported with the worst performing circuits and major event days.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Section 21204 of the Public Utilities Code is amended to read:21204.For the administration of this part, the department may adopt, administer, and enforce rules and regulations.The For the administration of this part, the department may adopt, administer, and enforce rules and regulations for the administration of this part. regulations.
|
Date
|
Status
|
|---|---|
| Mar 2, 2026 | Veto sustained. |
| Mar 2, 2026 | Stricken from file. |
| Oct 3, 2025 | In Senate. Consideration of Governor's veto pending. |
| Oct 3, 2025 | Vetoed by the Governor. |
| Sep 22, 2025 | Enrolled and presented to the Governor at 11 a.m. |
| Sep 11, 2025 | Assembly amendments concurred in. (Ayes 40. Noes 0. Page 2880.) Ordered to engrossing and enrolling. |
| Sep 10, 2025 | In Senate. Concurrence in Assembly amendments pending. |
| Sep 10, 2025 | Read third time. Passed. (Ayes 78. Noes 0. Page 3172.) Ordered to the Senate. |
| Sep 5, 2025 | Ordered to third reading. |
| Sep 5, 2025 | Read third time and amended. |
| Sep 5, 2025 | Assembly Rule 69(b)(1) suspended. |
| Sep 2, 2025 | Read second time. Ordered to third reading. |
| Aug 29, 2025 | From committee: Do pass. (Ayes 14. Noes 0.) (August 29). |
| Aug 20, 2025 | August 20 set for first hearing. Placed on APPR. suspense file. |
| Jul 17, 2025 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 17, 2025 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 17. Noes 0.) (July 16). |
| Jul 17, 2025 | Assembly Rule 63 suspended. (Ayes 49. Noes 15. Page 2578.) |
| Jul 8, 2025 | July 9 hearing postponed by committee. |
| Jun 16, 2025 | June 25 set for first hearing canceled at the request of author. |
| Jun 9, 2025 | Referred to Com. on U. & E. |
| Jun 4, 2025 | In Assembly. Read first time. Held at Desk. |
| Jun 3, 2025 | Read third time. Passed. (Ayes 38. Noes 0. Page 1464.) Ordered to the Assembly. |
| May 23, 2025 | Read second time. Ordered to third reading. |
| May 23, 2025 | From committee: Do pass. (Ayes 6. Noes 0. Page 1194.) (May 23). |
| May 20, 2025 | Set for hearing May 23. |
| May 19, 2025 | May 19 hearing: Placed on APPR. suspense file. |
| May 9, 2025 | Set for hearing May 19. |
| May 5, 2025 | Read second time and amended. Re-referred to Com. on APPR. |
| May 1, 2025 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 16. Noes 0. Page 934.) (April 29). |
| Apr 11, 2025 | Set for hearing April 29. |
| Apr 9, 2025 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on E., U & C. |
| Apr 2, 2025 | Re-referred to Com. on E., U & C. |
| Mar 26, 2025 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Feb 19, 2025 | Referred to Com. on RLS. |
| Feb 7, 2025 | From printer. May be acted upon on or after March 9. |
| Feb 6, 2025 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 11, 2025 | Unfinished Business SB292 Cervantes Concurrence | Senate Floor |
Passed |
|
| Sep 10, 2025 | SB 292 Cervantes Senate Third Reading By Harabedian | Assembly Floor |
Passed |
|
| Aug 29, 2025 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jul 16, 2025 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Energy |
Passed |
|
| Jun 3, 2025 | Senate 3rd Reading SB292 Cervantes | Senate Floor |
Passed |
|
| May 23, 2025 | Do pass | Senate Standing Committee on Appropriations |
Passed |
|
| May 19, 2025 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 29, 2025 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Easterseals Northern California | ** Support | |
| Pacific Gas and Electric (PG&E) | ** Against | |
| San Diego Gas & Electric | ** Against | |
| Southern California Edison | ** Against | |
| the state's three large electric IOUs | ** Against |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 292 |
VETO
Bill No: SB 292
Author: Cervantes (D)
Enrolled: 9/13/25
Vote: 27
SENATE ENERGY, U. & C. COMMITTEE: 16-0, 4/29/25
AYES: Becker, Ochoa Bogh, Allen, Archuleta, Arreguín, Ashby, Caballero, Dahle, Gonzalez, Hurtado, Limón, McNerney, Rubio, Stern, Strickland, Wahab
NO VOTE RECORDED: Grove
SENATE APPROPRIATIONS COMMITTEE: 6-0, 5/23/25
AYES: Caballero, Seyarto, Cabaldon, Grayson, Richardson, Wahab
NO VOTE RECORDED: Dahle
SENATE FLOOR: 38-0, 6/3/25
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
NO VOTE RECORDED: Jones, Reyes
SENATE FLOOR: 40-0, 9/11/25
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
ASSEMBLY FLOOR: 78-0, 9/10/25 - See last page for vote
SUBJECT: Electricity: wildfire mitigation: deenergization events and reliability
SOURCE: Author
DIGEST:
This bill requires the California Public Utilities Commission (CPUC) to consider requiring specified data reporting by electrical corporations regarding post-deenergization event reports and annual reliability reports. This bill also requires electric publicly owned utilities (POUs) to post on their website annual reliability reports.
ANALYSIS:
Existing law:
- Establishes the CPUC with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires every public utility to furnish and maintain adequate, efficient, just, and reasonable service, instrumentalities, equipment, and facilities, as are necessary to promote the safety, health, comfort, and convenience of its patrons, employees, and the public. (Public Utilities Code §451)
- Requires the CPUC to adopt inspection, maintenance, repair, and replacement standards, for the distribution systems of electrical corporations and requires the standards or rules to provide for high-quality, safe, and reliable service. Requires the CPUC to adopt standards for operation, reliability, and safety during periods of emergency and disaster. (Public Utilities Code §364)
- Establishes the policy of the state that each electrical corporation is required to continue to operate its electric distribution grid in its service territory and to do so in a safe, reliable, efficient, and cost-effective manner. (Public Utilities Code §399.2(a))
- Authorizes the CPUC to supervise and regulate every public utility in the state and to do all things necessary and convenient in the exercise of such power and jurisdiction. (Public Utilities Code §701)
- Requires the CPUC to require an electrical corporation to include in its annual reliability report information on the reliability of service to end-use customers that identifies the frequency and duration of interruptions of service. (Public Utilities Code §2774.1)
- Requires an electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. (Public Utilities Code §8386 (a))
- Requires electrical corporations, local electric POUs, and electrical cooperatives to annually prepare wildfire mitigation plans (WMPs) that include, among other things, descriptions of protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety and protocols related to mitigating public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system. (Public Utilities Code §8386 (b))
- Requires the WMPs of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits. (Public Utilities Code §8386 (c)(8))
- Defines “access and functional needs population” consists of individuals who have developmental or intellectual disabilities, physical disabilities, chronic conditions, injuries, limited English proficiency or who are non-English speaking, older adults, children, people living in institutionalized settings, or those who are low income, homeless, or transportation disadvantaged, including, but not limited to, those who are dependent on public transit or those who are pregnant relative to a local jurisdiction’s emergency plan. (Government Code §8593.3(f))
- Defines “disadvantaged community” to be areas disproportionately affected by environmental pollution and areas with concentrations of people who are low-income, among other factors. (Health and Safety Code §39711)
This bill:
- Requires the CPUC, on or before January 1, 2027, to determine whether its existing policies and procedures should be revised or enhanced to augment the safety and reliability of the electrical distribution system, including whether to consider reliability statistics of census tracts and whether the data reported aids the CPUC’s understanding of patterns of electrical outages that affect tribal governments, rural, disadvantaged or low-income communities.
- Requires a local electric POU to prepare an annual electric reliability report that identifies the frequency and duration of interruptions of service and may include specified reliability metrics and statistics. Requires that information in the annual reliability report prepared by the local electric POU and made publicly available be provided with sufficient confidentiality to protect electrical system security.
- Imposes a state-mandated local program by imposing additional duties on a local electric POU.
- Makes legislative findings to limit the rights to information in the require reports to ensure they are sufficiently confidential for purposes of protecting electrical system security.
- Requires electrical corporations to work with persons representatives of agencies and community-based organizations that serve, advocate on behalf of, or serve and advocate on behalf of, persons from the access and functional needs population to develop and make publicly available a plan to support that population during deenergization events.
- Requires electrical corporations, after each deenergization event, to prepare a post-deenergization event report that complies with the CPUC’s reporting requirements.
- Requires the CPUC, on or before January 1, 2027, to determine whether that report should also include other specified information, including census-tract level information and whether the census-tract is identified as a disadvantaged community.
- Requires the report to be provided to the locally elected body and specified individuals of the cities and counties affected by the deenergization event.
Background
Electricity service reliability annual reporting. Pursuant to CPUC decisions (D. 16-01-008 and D. 96-09-045) and statute, electrical corporations are required to annually prepare electric system reliability reports detailing the previous year’s electric reliability on their respective system and division levels based on recorded average outage duration and frequency. Electric system reliability metrics are defined by the Institute of Electrical and Electronics Engineers (IEEE) in standard IEEE 1366 – Guide for Electric Power Distribution Reliability Indices. The reports are required to be submitted by electrical corporations to the CPUC on July 15th. Additionally, the CPUC requires electrical corporations to make reliability data available to the public upon request.
The CPUC requires electrical corporations to report on the following four metrics annually:
- System Average Interruption Duration Index (SAIDI) – measures the average total minutes of outage that a customer on the system experienced in the reporting year.
- System Average Interruption Frequency Index (SAIFI) – measures the average number of sustained outages (i.e., outages greater than five minutes in duration) that a customer on the system experienced in the reporting year.
- Customer Average Interruption Duration Index (CAIDI) – measures the average duration of a single sustained outage (i.e., an outage that lasted longer than five minutes) that a customer experienced in the reporting year.
- Momentary Average Interruption Duration Index (MAIFI) – measures the average number of momentary outages (i.e., outages that lasts less than five minutes) that a customer experienced in the reporting year.
The CPUC requires the above metrics to be reported with, and without, the inclusion of Major Event Days (MEDs). MEDs are defined by IEEE 1366 as days in which the daily SAIDI of an event exceeds a statistically defined threshold based on the previous five years of daily SAIDI data. According to the CPUC website, this threshold excludes all but the worst 0.63% of outage events, making MEDs low frequency, high consequence events. The cause of an outage has no bearing on whether it will be classified as an MED. Deenergization events understood as proactive power shutoffs by electrical corporations to reduce the risks of fires (coined as Public Safety Power Shutoff (PSPS) events) are considered MEDs only insofar as they exceed the statistically defined threshold for MEDs.
Deenergization events. In recent years, California has experienced a number of catastrophic wildfires, including several ignited by electrical utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Risks for wildfires also increased with extended drought and bark beetle infestation that has increased tree mortalities and, as a result, increased the fuel, and risk for wildfires. As a result, electrical corporations have increasingly utilized proactive power shutoffs, deenergization of electric distribution (and sometimes transmission) lines, as a tool to prevent igniting wildfires, particularly during high wind event days with dry ground conditions. Although the use of proactive power shutoffs were met with opposition and concerns about its use by affected communities, ultimately the CPUC acknowledged electrical corporations’ authority to deenergize lines in order to protect public safety, noting this authority in Public Utilities Code §451 and §399.2.
Oversight and post-event reporting of deenergization events. The CPUC adopted protocols for deenergizing electric lines with a focus on who should receive notice and when, who should be responsible for notification, how different customer groups should be identified, the information that should be included in notifications in advance of and directly preceding a deenergizing event, the methods of communication, and how the electrical corporations should communicate and coordinate with public safety partners before, during, and after an event. The protocols require electrical corporations to develop work groups that include representative of the access and functional needs population. As the protocols have evolved over the years, there has been expanded requirements to develop needs assessments and plans to coordinate with identified access and functional needs population. Electrical corporations are also required to incorporate their protocols and procedures for proactive power shutoffs, as required by CPUC rules, within their WMPs. Additionally, the CPUC requires electrical corporations to provide post-event reports after each deenergization event with specified information, including: a list of circuits deenergized, its corresponding county, number of customers affected, and whether those customers are identified as requiring additional energy for medical reasons (medical baseline) or access and functional needs and maps of the affected areas. Electrical corporations must file these reports within 10 business days of restoration of service following a deenergization event (with some opportunity to extend the deadline).
Comments
Need for this bill. According to the author’s office,
The bill is designed to furnish valuable insights into affected communities through a process of community-engaged vulnerability analysis and mitigation initiatives. By assessing energization events and collecting relevant data proactively, we can take pre-emptive measures to address potential crises. Our state must grasp the risks that its diverse communities face regarding power outages to pursue innovative and effective resilience solutions.
It is particularly important to highlight that individuals across different income levels and privilege spectrums—especially those who have been historically marginalized and low-income—are disproportionately affected by outages. These communities often deal with overlapping vulnerabilities such as inadequate infrastructure, limited access to resources, and social isolation, which can severely impede their ability to recover from disasters.
Desire for more granular data about customers affected by power outages. In January of this year, with expected severe Santa Ana winds, low-humidity, high vegetation growth from previous wet winters, and dry conditions due to delayed precipitation, Southern California was at high risk for wildfires. Additionally, aerial fire suppression was limited by the extreme winds, which included gusts approaching 100 mph in some areas. As a result of these conditions, Southern California Edison (SCE) executed proactive power shutoffs resulting in extended outages throughout their service territory impacting upwards of over 500,000 customer accounts (affecting many times more individuals) between January 2 through January 27, including two separate (and, in some cases, overlapping) events. These deenergization events coincided with several wildfires in the broader region, including two large catastrophic fires, the Palisades Fire and the Eaton Fire, whose causes have not been determined, but in the case of the Eaton Fire, SCE suspects an out-of-service transmission tower may have played a role. The proactive power shutoffs executed by SCE in January of this year left customers across their service territory without power and, in some cases, without advanced notification of the loss of power. The bill’s author’s office notes their district was among the very hard-hit from the power outages, as power was shutoff for nearly a week in areas that had never experienced proactive power shutoffs. This bill requires the CPUC to consider additional data as part of existing reporting requirements in order to help better understand the impacts of these power shutoffs and other power outage events at a more granular level, specifically at the census-tract level and with identification for disadvantaged communities with the premise of better understanding any disproportionate effect on these communities. This bill also requires electrical corporations to work with organizations that support the access and functional needs population to plan for deenergization events, consistent with existing CPUC rules. The author’s office has shared this is intended to reflect the existing requirements and practice of the CPUC deenergization protocols. This bill also requires electric POUs to post annual reliability reports on their respective websites and submit these reports to the CEC.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee:
Onetime costs to the CPUC, likely in the hundreds of thousands of dollars (Public Utilities Commission Utilities Reimbursement Account), to consider IOUs post-deenergization event report requirements and annual IOU reliability report requirements.
According to the CPUC, most of the work required by this bill is already underway, though not yet complete, and the bill’s requirements might be premature. Even so, the CPUC indicates it would assign an administrative law judge to complete the tasks the bill requires of it, at an annual cost of $257,000.
SUPPORT: (Verified 10/6/25)
None received
OPPOSITION: (Verified 10/6/25)
None received
ARGUMENTS IN SUPPORT: According to the author:
SB 292 plays a crucial role by providing detailed historical and natural disaster-related data on power outages, which is essential for developing robust resilience planning strategies. As a state, it is imperative that we gain a deep understanding of the complexities surrounding demographic and socioeconomic factors to effectively enhance our planning efforts. This comprehensive data will serve as a guiding light, allowing us to identify and prioritize investments in the most vulnerable areas and implement tailored local solutions that can offer critical support during disasters, outages, and crises.
GOVERNOR'S VETO MESSAGE:
I am returning Senate Bill 292 without my signature.
This bill would require the California Public Utilities Commission (CPUC) to determine whether existing electric investor-owned utility (IOU) annual electric service reliability reports and post-Public Safety Power Shutoff (PSPS) event reports should include more detailed, circuit-level, and demographic data. The bill also requires the CPUC to consider amendments to General Order (GO) 166-Standards for Operation, Reliability, and Safety During Emergencies and Disasters – and requires publicly owned utilities to post their annual electric service reliability reports online.
While I share the author’s desire to improve the collection and disclosure of information related to PSPS events, this bill is duplicative of an existing CPUC public decision-making process. As such, this bill disrupts the procedures and requirements that have been developed over the past several years to effectively collect and disclose information about the factors influencing utility PSPS events and their frequency, scope and duration.
For these reasons, I cannot sign this bill.
ASSEMBLY FLOOR: 78-0, 9/10/25
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Castillo, Chen, Connolly, Davies, DeMaio, Dixon, Elhawary, Ellis, Fong, Gabriel, Gallagher, Garcia, Gipson, Jeff Gonzalez, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Johnson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Sanchez, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ta, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NO VOTE RECORDED: Flora, Tangipa
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
10/8/25 11:58:07
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 292 |
UNFINISHED BUSINESS
Bill No: SB 292
Author: Cervantes (D)
Amended: 9/5/25
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 16-0, 4/29/25
AYES: Becker, Ochoa Bogh, Allen, Archuleta, Arreguín, Ashby, Caballero, Dahle, Gonzalez, Hurtado, Limón, McNerney, Rubio, Stern, Strickland, Wahab
NO VOTE RECORDED: Grove
SENATE APPROPRIATIONS COMMITTEE: 6-0, 5/23/25
AYES: Caballero, Seyarto, Cabaldon, Grayson, Richardson, Wahab
NO VOTE RECORDED: Dahle
SENATE FLOOR: 38-0, 6/3/25
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
NO VOTE RECORDED: Jones, Reyes
ASSEMBLY FLOOR: 64-0, 9/10/25 – Roll call not available.
SUBJECT: Electricity: wildfire mitigation: deenergization events and reliability
SOURCE: Author
DIGEST:
This bill requires the California Public Utilities Commission (CPUC) to consider specified data reporting by electrical corporations regarding post-deenergization event reports and annual electric reliability reports. This bill also requires electric publicly owned utilities (POUs) to post on their website annual reliability reports.
Assembly Amendments
of 9/5/25 make explicit the CPUC proceeding where determinations regarding changes to reporting requirements must be considered; requires local electric POUs to submit their reports to the California Energy Commission (CEC); adds the limitations on public disclosure of confidential data; and provides additional substantive and clarifying changes.
ANALYSIS:
Existing law:
- Establishes the CPUC with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires every public utility to furnish and maintain adequate, efficient, just, and reasonable service, instrumentalities, equipment, and facilities, as are necessary to promote the safety, health, comfort, and convenience of its patrons, employees, and the public. (Public Utilities Code §451)
- Requires the CPUC to adopt inspection, maintenance, repair, and replacement standards, for the distribution systems of electrical corporations and requires the standards or rules to provide for high-quality, safe, and reliable service. Requires the CPUC to adopt standards for operation, reliability, and safety during periods of emergency and disaster. (Public Utilities Code §364)
- Establishes the policy of the state that each electrical corporation is required to continue to operate its electric distribution grid in its service territory and to do so in a safe, reliable, efficient, and cost-effective manner. (Public Utilities Code §399.2(a))
- Authorizes the CPUC to supervise and regulate every public utility in the state and to do all things necessary and convenient in the exercise of such power and jurisdiction. (Public Utilities Code §701)
- Requires the CPUC to require an electrical corporation to include in its annual reliability report information on the reliability of service to end-use customers that identifies the frequency and duration of interruptions of service. (Public Utilities Code §2774.1)
- Requires an electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. (Public Utilities Code §8386 (a))
- Requires electrical corporations, local electric POUs, and electrical cooperatives to annually prepare wildfire mitigation plans (WMPs) that include, among other things, descriptions of protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety and protocols related to mitigating public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system. (Public Utilities Code §8386 (b))
- Requires the WMPs of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits. (Public Utilities Code §8386 (c)(8))
- Defines “access and functional needs population” consists of individuals who have developmental or intellectual disabilities, physical disabilities, chronic conditions, injuries, limited English proficiency or who are non-English speaking, older adults, children, people living in institutionalized settings, or those who are low income, homeless, or transportation disadvantaged, including, but not limited to, those who are dependent on public transit or those who are pregnant relative to a local jurisdiction’s emergency plan. (Government Code §8593.3(f))
- Defines “disadvantaged community” to be areas disproportionately affected by environmental pollution and areas with concentrations of people who are low-income, among other factors. (Health and Safety Code §39711)
This bill:
Relevant to the annual electric reliability report
- Requires the CPUC, on or before January 1, 2027, to determine whether its existing policies and procedures should be revised or enhanced to augment the safety and reliability of the electrical distribution system, including whether to consider reliability statistics of census tracts and whether the data reported aids the CPUC’s understanding of patterns of electrical outages that affect tribal governments, rural, disadvantaged or low-income communities.
- Requires a local electric POU to prepare an annual electric reliability report that identifies the frequency and duration of interruptions of service and may include specified reliability metrics and statistics. Requires that information in the annual reliability report prepared by the local electric POU and made publicly available be provided with sufficient confidentiality to protect electrical system security.
- Imposes a state-mandated local program by imposing additional duties on a local electric POU.
- Makes legislative findings to limit the rights to information in the require reports to ensure they are sufficiently confidential for purposes of protecting electrical system security.
Relevant to deenergization events to reduce the risks of wildfires
- Requires electrical corporations to work with persons representatives of agencies and community-based organizations that serve, advocate on behalf of, or serve and advocate on behalf of, persons from the access and functional needs population to develop and make publicly available a plan to support that population during deenergization events.
- Requires electrical corporations, after each deenergization event, to prepare a post-deenergization event report that complies with the CPUC’s reporting requirements.
- Requires the CPUC, on or before January 1, 2027, to determine whether that report should also include other specified information, including census-tract level information and whether the census-tract is identified as a disadvantaged community.
- Requires the report to be provided to the locally elected body and specified individuals of the cities and counties affected by the deenergization event.
Background
Electric reliability annual reporting. Pursuant to CPUC decisions (D. 16-01-008 and D. 96-09-045) and statute, electrical corporations are required to annually prepare electric system reliability reports detailing the previous year’s electric reliability on their respective system and division levels based on recorded average outage duration and frequency. Electric system reliability metrics are defined by the Institute of Electrical and Electronics Engineers (IEEE) in standard IEEE 1366 – Guide for Electric Power Distribution Reliability Indices. The reports are required to be submitted to the CPUC on July 15th. Additionally, the CPUC requires electrical corporations to make reliability data available to the public upon request.
The CPUC requires electrical corporations to report on the following four metrics annually:
- System Average Interruption Duration Index (SAIDI) – measures the average total minutes of outage that a customer on the system experienced in the reporting year.
- System Average Interruption Frequency Index (SAIFI) – measures the average number of sustained outages (i.e., outages greater than five minutes in duration) that a customer on the system experienced in the reporting year.
- Customer Average Interruption Duration Index (CAIDI) – measures the average duration of a single sustained outage (i.e., an outage that lasted longer than five minutes) that a customer experienced in the reporting year.
- Momentary Average Interruption Duration Index (MAIFI) – measures the average number of momentary outages (i.e., outages that lasts less than five minutes) that a customer experienced in the reporting year.
The CPUC requires the above metrics to be reported with, and without, the inclusion of Major Event Days (MEDs). MEDs are defined by IEEE 1366 as days in which the daily SAIDI of an event exceeds a statistically defined threshold based on the previous five years of daily SAIDI data. According to the CPUC website, this threshold excludes all but the worst 0.63% of outage events, making MEDs low frequency, high consequence events. The cause of an outage has no bearing on whether it will be classified as an MED. Deenergization events understood as proactive power shutoffs by electrical corporations to reduce the risks of fires (coined as Public Safety Power Shutoff (PSPS) events) are considered MEDs only insofar as they exceed the statistically defined threshold for MEDs.
Deenergization events. In recent years, California has experienced a number of catastrophic wildfires, including several ignited by electrical utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Risks for wildfires also increased with extended drought and bark beetle infestation that has increased tree mortalities and, as a result, increased the fuel, and risk for wildfires. As a result, electrical corporations have increasingly utilized proactive power shutoffs, deenergization of electric distribution (and sometimes transmission) lines, as a tool to prevent igniting wildfires, particularly during high wind event days with dry ground conditions. Although the use of proactive power shutoffs were met with opposition and concerns about its use by affected communities, ultimately the CPUC acknowledged electrical corporations’ authority to deenergize lines in order to protect public safety, noting this authority in Public Utilities Code §451 and §399.2.
Oversight and post-event reporting of deenergization events. The CPUC adopted protocols for deenergizing electric lines with a focus on who should receive notice and when, who should be responsible for notification, how different customer groups should be identified, the information that should be included in notifications in advance of and directly preceding a deenergizing event, the methods of communication, and how the electrical corporations should communicate and coordinate with public safety partners before, during, and after an event. The protocols require electrical corporations to develop work groups that include representative of the access and functional needs population. As the protocols have evolved over the years, there has been expanded requirements to develop needs assessments and plans to coordinate with identified access and functional needs population. Electrical corporations are also required to incorporate their protocols and procedures for proactive power shutoffs, as required by CPUC rules, within their WMPs. Additionally, the CPUC requires electrical corporations to provide post-event reports after each deenergization event with specified information, including: a list of circuits deenergized, its corresponding county, number of customers affected, and whether those customers are identified as requiring additional energy for medical reasons (medical baseline) or access and functional needs and maps of the affected areas. Electrical corporations must file these reports within 10 business days of restoration of service following a deenergization event (with some opportunity to extend the deadline).
Comments
Need for this bill. According to the author’s office,
The bill is designed to furnish valuable insights into affected communities through a process of community-engaged vulnerability analysis and mitigation initiatives. By assessing energization events and collecting relevant data proactively, we can take pre-emptive measures to address potential crises. Our state must grasp the risks that its diverse communities face regarding power outages to pursue innovative and effective resilience solutions.
It is particularly important to highlight that individuals across different income levels and privilege spectrums—especially those who have been historically marginalized and low-income—are disproportionately affected by outages. These communities often deal with overlapping vulnerabilities such as inadequate infrastructure, limited access to resources, and social isolation, which can severely impede their ability to recover from disasters.
January 2025 Santa Ana wind events. This January, with expected severe Santa Ana winds, low-humidity, high vegetation growth from previous wet winters, and dry conditions due to delayed precipitation, Southern California was at high risk for wildfires. Additionally, aerial fire suppression was limited by the extreme winds, which included gusts approaching 100 mph in some areas. In the case of Southern California Edison (SCE), the proactive power shutoffs resulted in extended outages throughout their service territory impacting upwards of over 500,000 customer accounts (affecting many times more individuals) between January 2 through January 27, including two separate (and, in some cases, overlapping) events. These deenergization events coincided with several wildfires in the broader region, including two large catastrophic fires, the Palisades Fire and the Eaton Fire (fire investigations as to the cause of these fires are still in process, ignition cause has not been determined). Based on SCE’s post-event reports, the proactive power shutoffs were the largest number of affected customers since the tool had been deployed by the utility and likely the largest in duration for the utility. These events resulted in many frustrations for customers and local governments as the utility’s execution of the proactive power shutoffs seems to have been greatly challenged by the scale and duration of the events with reports that their website crashed, inadequate notifications to customers, inability of some local governments to reach a utility point person, and inaccurate maps displayed at times on their websites. SCE also adjusted their operational thresholds in the midst of the events due to the evolving conditions which resulted in many customers unexpectedly experiencing proactive power shutoff without any advance notification. SCE’s post-event reports also indicated nearly 100 incidents of damage on deenergized facilities that, if they had been energized, could have been a significant risk to igniting wildfires.
Desire for more granular data. The proactive power shutoffs executed by SCE in January of this year left customers across their service territory without power and, in some cases, without any advanced notification. The author’s office notes their district was among the very hard-hit from the power outages, as power was shutoff for nearly a week in areas that had never experienced proactive power shutoffs. This bill requires the CPUC to consider additional data as part of existing reporting requirements to better understand the impacts of these power shutoffs and other power outage events at a more granular level, specifically at the census-tract level and with identification for disadvantaged communities with the premise of better understanding any disproportionate effect on these communities. This bill also requires electrical corporations to work with organizations that support the access and functional needs population to plan for deenergization events, consistent with existing CPUC rules. The author’s office has shared this is intended to reflect the existing requirements and practice of the CPUC deenergization protocols. This bill also requires electric POUs to post annual reliability reports on their respective websites and submit these reports to the CEC.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee:
Onetime costs to the CPUC, likely in the hundreds of thousands of dollars (Public Utilities Commission Utilities Reimbursement Account), to consider IOUs post-deenergization event report requirements and annual IOU reliability report requirements.
According to the CPUC, most of the work required by this bill is already underway, though not yet complete, and the bill’s requirements might be premature. Even so, the CPUC indicates it would assign an administrative law judge to complete the tasks the bill requires of it, at an annual cost of $257,000.
SUPPORT: (Verified 9/8/25)
None received
OPPOSITION: (Verified 9/8/25)
None received
ARGUMENTS IN SUPPORT: According to the author:
SB 292 plays a crucial role by providing detailed historical and natural disaster-related data on power outages, which is essential for developing robust resilience planning strategies. As a state, it is imperative that we gain a deep understanding of the complexities surrounding demographic and socioeconomic factors to effectively enhance our planning efforts. This comprehensive data will serve as a guiding light, allowing us to identify and prioritize investments in the most vulnerable areas and implement tailored local solutions that can offer critical support during disasters, outages, and crises.
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
9/10/25 14:59:55
**** END ****
SENATE THIRD READING
STR Bill Id:SB 292
Author:(Cervantes)
As Amended Ver:September 5, 2025
Majority vote
SUMMARY
Requires the California Public Utilities Commission (CPUC) to consider additions to the annual reliability reports submitted by investor-owned utilities (IOUs). The bill requires IOUs to prepare a post-deenergization event report, generate a plan to support the functional needs population during deenergization, and requires publicly owned utilities to submit an annual reliability report.
Major Provisions
- Requires the CPUC to determine whether shall determine, as part of the proceeding in Rulemaking 24-05-023 (June 6, 2024) or a successor proceeding, whether its existing policies, procedures, and rules should be revised to augment the safety and reliability of the electrical distribution system. This determination shall consider, but not be limited to,
- Enhancements or updates to annual reliability reports including reliability statistics at census tracts.
- Data or statistics to aid the commission's understanding of whether there are patterns of electrical outages that disproportionately affect tribal governments or rural, disadvantaged, or low-income communities.
- Updates to General Order 166 for purposes of reliability thresholds and reporting requirements.
- Requires a publicly owned electric utility to prepare and make publicly available on its internet website and submit to the Energy Commission an annual reliability report that identifies, but is not limited to, the frequency and duration of interruptions in services.
- Requires IOUs to work with persons from the access and functional needs population to develop and make publicly available a plan to support this population during a deenergization event and submit the plan to the CPUC.
- Requires an IOU to prepare a post-deenergization event report after each event that complies with the commission's reporting requirements established in a proceeding pursuant to Rulemaking 18-12-005 (December 19, 2018), or a successor proceeding, and any additional requirements determined by the Safety and Enforcement Division of the CPUC.
- Requires the CPUC to determine whether the post-deenergization event report should include either of geospatial data of the deenergization event and statistics describing the census tract-level impacts of the deenergization event. This report shall be filed, served and distributed in accordance with requirements established through a proceeding pursuant to Rulemaking 18-12-005 and made publically available on the electrical corporation's website.
COMMENTS
A deenergization event is when an electrical utility shuts off power to a line or equipment. The CPUC has authorized the IOUs to use deenergization as a tactic to mitigate the risk of catastrophic wildfire. In such circumstances, the deenergization event is known as a public safety power shutoff (PSPS). IOUs are required to send notifications to customers on a specified schedule prior to the expected de-energization and until re-energization, often associated with PSPS. These notifications are intended to give customers adequate warning to prepare in advance for a proactive de-energization, which the IOUs perform as a last resort when weather conditions could result in a devastating wildfire. Timely notification allows customers to prepare for potential outages and make necessary arrangements based on the information provided. There has been a history of problems with PSPS notification systems across the IOUs since the initiation of these protocols. This includes in the PSPS initiated by Southern California Edison on January 2, 2025. According to the Public Advocates Office, during the Southern California fires in 2025, SCE failed to send 307,211 required notifications to Public Safety Partners, Critical Facilities and Infrastructure, and customers.
The inadequacies of communication and community outreach surrounding the deenergization events in Southern California this last January have led to significant scrutiny. The goal of this bill is to address PSPS protocols and reliability by first collecting more data, at higher resolution, after deenergization events occur. Some of the reporting included in the bill is already mandated by the CPUC for IOUs.
Prior to 2016, the CPUC mandated IOUs to report the reliability or the electrical grid at the system-level. This means information was aggregated for the entire electric service territory or system for each electric utility. Thus, municipalities, businesses or homeowners who wanted reliability information that is specific to their location had trouble getting information at the level of the electrical circuit(s) that serve them. Utilities were able to remove days that the energy delivery system experienced stress beyond that normally expected from the threshold from their reliability indices calculations.
After 2016, CPUC Decision D.16-01-008 directs IOUs to annually prepare electric system reliability reports detailing the previous year's electric reliability on the system and division levels. These metrics are required to be reported with and without the inclusion of Major Event Days (MEDs). The threshold defining MEDs excludes all but the worst 0.63% of outage events, making MEDs low frequency, high consequence events. The cause of an outage has no bearing on whether it will be classified as an MED. Public Safety Power Shutoff (PSPS) events are considered MEDs only insofar as they exceed this statistically defined threshold.
The CPUC has mandated that IOUs submit a report to the Director of Safety and Enforcement Division at the CPUC within 10 business days after each de-energization or high threat level event. These reports include at a minimum the following information:
- The IOU shall identify the community representatives contacted prior to de-energization, the date on which they were contacted, and how the deenergized area is classified.
- If an IOU is not able to provide customers with notice at least 2 hours prior to the de-energization event, the IOU shall provide an explanation in its report.
- The IOU shall summarize the number and nature of complaints received as the result of the de-energization event and include claims that are filed against the IOU because of de-energization.
- The IOU shall provide detailed description of the steps it took to restore power.
- The IOU shall identify the address of each community assistance location during a de-energization event, describe the location (in a building, a trailer, etc.), describe the assistance available at each location, and give the days and hours that it was open.
According to the Author
"SB 292 plays a crucial role by providing detailed historical and natural disaster-related data on power outages, which is essential for developing robust resilience planning strategies. As a state, it is imperative that we gain a deep understanding of the complexities surrounding demographic and socioeconomic factors to effectively enhance our planning efforts. This comprehensive data will serve as a guiding light, allowing us to identify and prioritize investments in the most vulnerable areas and implement tailored local solutions that can offer critical support during disasters, outages, and crises. SB 292 aims to bridge the critical divide between utility reporting and community resilience planning. By doing so, it enables us to utilize outage data not merely as numbers, but as a meaningful lens through which we can better understand and address the far-reaching impacts of outage durations on our most vulnerable populations."
Arguments in Support
The bill has changed significantly with the most recent amendments. Prior to these amendments, the Easterseals Northern California wrote in support of the bill stating that PSPS poses a severe threat to the health and safety of people with physical disabilities or intellectual and developmental disabilities. "SB 292 would require electrical corporations to develop and make publicly available a plan to support the access and functional needs population, including individuals with disabilities, during deenergization events." They argue that the bill would ensure that "vulnerable populations receive the assistance they need to prepare for and endure power shut offs."
Arguments in Opposition
The bill has changed significantly with the most recent amendments.
Prior to these amendments, the three large electric IOUs (PG&E, Southern California Edison, and San Diego Gas and Electric) are opposed to the bill and argue that the bill is redundant and would expand Public Safety Power Shutoff post-event reporting in ways that have already been litigated at the CPUC, ultimately increasing costs to ratepayers.
FISCAL COMMENTS
The Assembly Committee on appropriations estimates a onetime costs to the CPUC, likely in the hundreds of thousands of dollars (Public Utilities Commission Utilities Reimbursement Account), to consider IOUs post-deenergization event report requirements and annual IOU reliability report requirements.
According to the CPUC, most of the work required by this bill is already underway, though not yet complete, and the bill's requirements might be premature. Even so, the CPUC indicates it would assign an administrative law judge to complete the tasks the bill requires of it, at an annual cost of $257,000.
VOTES
SENATE FLOOR: 38-0-2
YES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
ABS, ABST OR NV: Jones, Reyes
ASM UTILITIES AND ENERGY: 17-0-1
YES: Petrie-Norris, Boerner, Calderon, Chen, Davies, Mark González, Harabedian, Hart, Irwin, Kalra, Papan, Rogers, Schiavo, Schultz, Ta, Wallis, Zbur
ABS, ABST OR NV: Patterson
ASM APPROPRIATIONS: 14-0-1
YES: Wicks, Sanchez, Arambula, Calderon, Caloza, Dixon, Elhawary, Fong, Mark González, Ahrens, Pacheco, Pellerin, Solache, Ta
ABS, ABST OR NV: Tangipa
UPDATED
VERSION: September 5, 2025
CONSULTANT: Kristen Koenig / U. & E. / (916) 319-2083 FN: 0001766
SENATE THIRD READING
STR Bill Id:SB 292
Author:(Cervantes)
As Amended Ver:July 17, 2025
Majority vote
SUMMARY
Requires the California Public Utilities Commission (CPUC) to consider additions to the annual reliability reports submitted by investor-owned utilities (IOUs). The bill requires IOUs to prepare a post-deenergization event report, generate a plan to support the functional needs population during deenergization, and requires publicly owned utilities to submit an annual reliability report.
Major Provisions
- Requires the CPUC to determine whether the annual reliability reports submitted by IOUs should include system- and division-level reliability, reliability statistics at census tracts or smaller
- Requires a publicly owned electric utility to prepare and make publicly available on its internet website and submit to the Energy Commission an annual reliability report that identifies, but is not limited to, the frequency and duration of interruptions in services.
- Requires IOUs to work with persons from the access and functional needs population to develop and make publicly available a plan to support this population during a deenergization event and submit the plan to the CPUC.
- Requires an IOU to prepare a post-deenergization event report after each event that contains the time, place, and duration of the deenergization event, as well as the number of affected customers and the number of customers who receive a form of financial assistance.
- Requires the CPUC to determine whether the post-deenergization event report should include either of geospatial data of the deenergization event and statistics describing the census tract-level impacts of the deenergization event.
COMMENTS
Generally, a deenergization event is when an electrical utility shuts off power to a line or equipment. The CPUC has authorized the IOUs to use deenergization as a tactic to mitigate the risk of catastrophic wildfire. In such circumstances, the deenergization event is known as a public safety power shutoff (PSPS). IOUs are required to send notifications to customers on a specified schedule prior to the expected de-energization and until re-energization, often associated with PSPS. These notifications are intended to give customers adequate warning to prepare in advance for a proactive de-energization, which the IOUs perform as a last resort when weather conditions could result in a devastating wildfire. Timely notification allows customers to prepare for potential outages and make necessary arrangements based on the information provided. There has been a history of problems with PSPS notification systems across the IOUs since the initiation of these protocols. This includes in the PSPS initiated by Southern California Edison on January 2, 2025. According to the Public Advocates Office, during the Southern California fires in 2025, SCE failed to send 307,211 required notifications to Public Safety Partners, Critical Facilities and Infrastructure, and customers.
The inadequacies of communication and community outreach surrounding the deenergization events in Southern California this last January have led to significant scrutiny. The goal of this bill is to address PSPS protocols and reliability by first collecting more data, at higher resolution, after deenergization events occur. Some of the reporting included in the bill is already mandated by the CPUC for IOUs.
Prior to 2016, the CPUC mandated IOUs to report the reliability or the electrical grid at the system-level. This means information was aggregated for the entire electric service territory or system for each electric utility. Thus, municipalities, businesses or homeowners who wanted reliability information that is specific to their location had trouble getting information at the level of the electrical circuit(s) that serve them. Utilities were able to remove days that the energy delivery system experienced stress beyond that normally expected from the threshold from their reliability indices calculations.
After 2016, CPUC Decision D.16-01-008 directs IOUs to annually prepare electric system reliability reports detailing the previous year's electric reliability on the system and division levels. These metrics are required to be reported with and without the inclusion of Major Event Days (MEDs). The threshold defining MEDs excludes all but the worst 0.63% of outage events, making MEDs low frequency, high consequence events. The cause of an outage has no bearing on whether it will be classified as an MED. Public Safety Power Shutoff (PSPS) events are considered MEDs only insofar as they exceed this statistically defined threshold.
The CPUC has mandated that IOUs submit a report to the Director of Safety and Enforcement Division at the CPUC within 10 business days after each de-energization or high threat level event. These reports include at a minimum the following information:
- The IOU shall identify the community representatives contacted prior to de-energization, the date on which they were contacted, and how the deenergized area is classified.
- If an IOU is not able to provide customers with notice at least 2 hours prior to the de-energization event, the IOU shall provide an explanation in its report.
- The IOU shall summarize the number and nature of complaints received as the result of the de-energization event and include claims that are filed against the IOU because of de-energization.
- The IOU shall provide detailed description of the steps it took to restore power.
- The IOU shall identify the address of each community assistance location during a de-energization event, describe the location (in a building, a trailer, etc.), describe the assistance available at each location, and give the days and hours that it was open.
According to the Author
"SB 292 plays a crucial role by providing detailed historical and natural disaster-related data on power outages, which is essential for developing robust resilience planning strategies. As a state, it is imperative that we gain a deep understanding of the complexities surrounding demographic and socioeconomic factors to effectively enhance our planning efforts. This comprehensive data will serve as a guiding light, allowing us to identify and prioritize investments in the most vulnerable areas and implement tailored local solutions that can offer critical support during disasters, outages, and crises. SB 292 aims to bridge the critical divide between utility reporting and community resilience planning. By doing so, it enables us to utilize outage data not merely as numbers, but as a meaningful lens through which we can better understand and address the far-reaching impacts of outage durations on our most vulnerable populations."
Arguments in Support
Easterseals Northern California writes in support of the bill stating that PSPS poses a severe threat to the health and safety of people with physical disabilities or intellectual and developmental disabilities. "SB 292 would require electrical corporations to develop and make publicly available a plan to support the access and functional needs population, including individuals with disabilities, during deenergization events." They argue that the bill would ensure that "vulnerable populations receive the assistance they need to prepare for and endure power shut offs."
Arguments in Opposition
The three large electric IOUs (PG&E, Southern California Edison, and San Diego Gas and Electric) are opposed to the bill and argue that the bill is redundant and would expand Public Safety Power Shutoff post-event reporting in ways that have already been litigated at the CPUC, ultimately increasing costs to ratepayers.
FISCAL COMMENTS
The Assembly Committee on appropriations estimates a onetime costs to the CPUC, likely in the hundreds of thousands of dollars (Public Utilities Commission Utilities Reimbursement Account), to consider IOUs post-deenergization event report requirements and annual IOU reliability report requirements.
According to the CPUC, most of the work required by this bill is already underway, though not yet complete, and the bill's requirements might be premature. Even so, the CPUC indicates it would assign an administrative law judge to complete the tasks the bill requires of it, at an annual cost of $257,000.
VOTES
SENATE FLOOR: 38-0-2
YES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
ABS, ABST OR NV: Jones, Reyes
ASM UTILITIES AND ENERGY: 17-0-1
YES: Petrie-Norris, Boerner, Calderon, Chen, Davies, Mark González, Harabedian, Hart, Irwin, Kalra, Papan, Rogers, Schiavo, Schultz, Ta, Wallis, Zbur
ABS, ABST OR NV: Patterson
ASM APPROPRIATIONS: 14-0-1
YES: Wicks, Sanchez, Arambula, Calderon, Caloza, Dixon, Elhawary, Fong, Mark González, Ahrens, Pacheco, Pellerin, Solache, Ta
ABS, ABST OR NV: Tangipa
UPDATED
VERSION: July 17, 2025
CONSULTANT: Kristen Koenig / U. & E. / (916) 319-2083 FN: 0001356
Date of Hearing: August 20, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 292
Author:(Cervantes) – As Amended Ver:July 17, 2025
Policy Committee: | Utilities and Energy | Vote: | 17 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill makes several changes to law regarding electricity deenergization events, including that each investor-owned utility (IOU) work with representatives of state agencies and community-based organizations that serve or advocate on behalf of an access and functional needs population regarding deenergization events.
Specifically, this bill, among other things:
- Directs each IOU to work with representatives of state agencies and community-based organizations that serve or advocate on behalf of an access and functional needs population to develop and make publicly available a plan to support the population during a deenergization event and to submit the plan to the California Public Utilities Commission (CPUC).
- Requires an IOU, after each deenergization event, to prepare a post-deenergization event report that contains specified information, including the number of affected customers who receive specified energy utility bill financial assistance or who receive a medical baseline allowance, and directs the IOU to submit the report to the CPUC and to the locally elected body and the city manager or the chief administrative officer of the cities and counties affected by the deenergization event.
- Requires the CPUC, by January 1, 2027, determine whether an IOU’s post-deenergization event report should include (a) specified geospatial data on the locations of any circuit or circuit segments involved in the deenergization event and statistics describing the census tract-level impacts of the event and (b) information regarding the deenergization event disaggregated by census tract and whether the census tract is a disadvantaged community, as identified in current law.
- Directs the CPUC, by January 1, 2027, to determine whether the annual reliability reports current law requires of IOUs should include any of specified information regarding reliability, including (a) statistics at census tracts or smaller resolutions and (b) reliability statistics for customers who receive energy utility bill financial assistance or who receive a medical baseline allowance.
- Requires a local publicly owned electric utility (POU) prepare and post conspicuously on its website an annual reliability report that identifies, but is not limited to, the frequency and duration of interruptions in services.
FISCAL EFFECT:
Onetime costs to the CPUC, likely in the hundreds of thousands of dollars (Public Utilities Commission Utilities Reimbursement Account), to consider IOUs post-deenergization event report requirements and annual IOU reliability report requirements.
According to the CPUC, most of the work required by this bill is already underway, though not yet complete, and the bill’s requirements might be premature. Even so, the CPUC indicates it would assign an administrative law judge to complete the tasks the bill requires of it, at an annual cost of $257,000.
COMMENTS:
- Purpose. The author intends this bill to provide data to allow for better planning for deenergization events, especially in regards to how such events affect vulnerable populations.
- Background. Generally, a deenergization event is when an electrical utility shuts off power to a line or equipment. The CPUC authorized the IOUs to use deenergization as a tactic to mitigate the risk of catastrophic wildfire. In such circumstances, the deenergization event is known as a public safety power shutoff (PSPS). The CPUC requires an IOU that is planning to implement a PSPS to communicate repeatedly, and within specified timeframes, with customers whose electrical service will be subject to the PSPS. In addition, CPUC rules require an IOU that implements a PSPS to report specified information on the PSPS to the CPUC within 10 business days.
In January of this year, extreme winds and dry weather led Southern California Edison (SoCal Edison) to implement widespread PSPSs for extended periods. In reviewing the utility’s actions, the Public Advocate’s Office (an independent office within the CPUC that advocates on behalf of residential and small business IOU customers, primarily) found SoCal Edison failed to send tens of thousands of required notifications, and that these failures “continued a pattern of failure” of SoCal Edison to provide its customers with advance notification prior to de-energization.
Writing collectively in opposition this bill, the state’s three large electric IOUs contend SB 292 includes provisions “that have been considered and settled through prior proceedings at the California Public Utilities Commission” or that are “already included in the scope of the Commission’s active rulemaking proceeding” and that the bill requires the IOUs include in their post deenergization event reporting “information that is already provided in the IOU’s annual reports on PSPS programs” and events and “would likely result in additional costs and delayed post-event report submissions.”
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: July 16, 2025
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
SBPCA Bill Id:SB 292
Author:(Cervantes) – As Amended Ver:May 5, 2025
SENATE VOTE: 38-0
SUBJECT: Electricity: wildfire mitigation: deenergization events and reliability
SUMMARY: Requires the California Public Utilities Commission (CPUC) to consider additions to the annual reliability reports submitted by investor-owned utilities (IOUs). The bill requires IOUs to prepare a post-deenergization event report, generate a plan to support the functional needs population during deenergization, and requires publicly owned utilities to submit an annual reliability report.
Specifically, this bill:
- Requires the CPUC to determine whether the annual reliability reports submitted by IOUs should include system- and division-level reliability, reliability statistics at census tracts or smaller
- Requires IOUs to work with persons from the access and functional needs population to develop and make publicly available a plan to support this population during a deenergization event and submit the plan to the CPUC.
- Requires an IOU to prepare a post-deenergization event report after each event that contains the time, place, and duration of the deenergization event, as well as the number of affected customers and the number of customers who receive a form of financial assistance.
- Requires the CPUc to determine whether the post-deenergization event report should include either of geospatial data of the deenergization event and statistics describing the census tract-level impacts of the deenergization event
- Requires the report to be provided to the locally elected body and the city manager or the chief administrative officer of the cities and counties affected by the deenergization event and must be updated and submitted by the California Energy Commission (CEC) annually.
- A local publicly owned electric utility shall prepare and make publicly available on its internet website an annual reliability report equivalent to the report required to be prepared by IOUs and submitted to the CPUC.
EXISTING LAW:
- Establishes the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Establishes the Office of Energy Infrastructure Safety (OEIS) is the successor to, and, effective July 1, 2021, is vested with, all of the duties, powers, and responsibilities of the Wildfire Safety Division within the CPUC established pursuant to Section 326 of the Public Utilities Code, including, but not limited to, the power to compel information and conduct investigations. (Government Code § 15475)
- Requires every public utility to furnish and maintain adequate, efficient, just, and reasonable service, instrumentalities, equipment, and facilities, as are necessary to promote the safety, health, comfort, and convenience of its patrons, employees, and the public. (Public Utilities Code § 451)
- Establishes the policy of the state that each electrical corporation is required to continue operating its electric distribution grid in its service territory and to do so in a safe, reliable, efficient, and cost-effective manner. (Public Utilities Code §399.2(a))
- Authorizes the CPUC to supervise and regulate every public utility in the state and to do all things necessary and convenient in the exercise of such power and jurisdiction. (Public Utilities Code § 701)
- Requires an electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. (Public Utilities Code § 8386 (a))
- Requires electrical corporations, local electric publicly owned utilities (POUs), and electrical cooperatives to annually prepare wildfire mitigation plans (WMPs) that include, among other things, descriptions of protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety and protocols related to mitigating public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system. (Public Utilities Code § 8386 (b))
- Requires a WMP of an electrical corporation to include, among other things, protocols for deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, and protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communications infrastructure. (Public Utilities Code § 8386 (c)(6))
- Requires a WMP plan of an electrical corporation to also include appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines and requires these procedures to consider the need to notify, as a priority, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of a potential deenergization event. (Public Utilities Code § 8386 (c)(7))
- Requires the WMPs of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits. (Public Utilities Code § 8386 (c)(8))
- Requires the CPUC to require an electrical corporation to include in its annual reliability report information on the reliability of service to end-use customers that identifies the frequency and duration of interruptions of service. (Public Utilities Code § 2774.1)
- Requires the CPUC to establish an expedited utility distribution undergrounding program. Requires large electrical corporations to participate in the program, to submit to the OEIS a distribution infrastructure undergrounding plan meeting certain requirements. (Public Utilities Code § 8388.5)
FISCAL EFFECT: According to the Senate Committee on Appropriations, the California Public Utilities Commission (CPUC) estimates one-time costs of $257,000 (ratepayer funds) to determine whether post-deenergization reports should include more information than currently required by January 1, 2027, among other things.
CONSUMER COST IMPACTS: Unknown.
BACKGROUND:
CPUC Reliability Reporting – Prior to 2016, mandated reliability reporting by the IOUs to the CPUC was at the system-level. This means information was aggregated for the entire electric service territory or system for each electric utility. Thus municipalities, businesses or homeowners who wanted reliability information that is specific to their location had trouble getting information at the level of the electrical circuit(s) that serve them. Utilities were able to remove days that the energy delivery system experienced stress beyond that normally expected from the threshold from their reliability indices calculations.[1]
After 2016, CPUC Decision D.16-01-008 directs IOUs to annually prepare electric system reliability reports detailing the previous year’s electric reliability on the system and division levels. These reports are submitted to the Energy Division annually on July 15th. These metrics are required to be reported with and without the inclusion of Major Event Days (MEDs). The threshold defining MEDs excludes all but the worst 0.63% of outage events, making MEDs low frequency, high consequence events. The cause of an outage has no bearing on whether it will be classified as an MED. Public Safety Power Shutoff (PSPS) events are considered MEDs only insofar as they exceed this statistically defined threshold. The 2020 reliability metrics for the state of California relative to the rest of the Southwest and nation are shown in Figure 1, including and excluding MED.[2]
Figure 1. 2020 SAIDI Values (Average total minutes of outage that a customer on the system experienced in the reporting year) including Major Event Days.[3] 2020 SAIDI Excluding Major Event Days |
Wildfire Mitigation Plans – Wildfire Mitigation Plans were initiated by the enactment of SB 1028 (Hill, Chapter 598, Statutes of 2016). These original Wildfire Mitigation Plans included, among other provisions, a description of preventative strategies and programs that can minimize risk of catastrophic wildfires. They were approved by the CPUC in June 2019 through the rulemaking process. Later in 2019, the Legislature revised the scope of the WMP to cover at least a three-year period,[4] and divided oversight of the plans between OEIS (originally the Wildfire Safety Division housed under the CPUC) and the CPUC.[5] OEIS is tasked with assessing safety; they evaluate if proposed actions in the WMP achieve the maximum feasible wildfire risk reduction.[6] The CPUC is then tasked with reviewing cost; they evaluate if the cost of implementing each mitigation effort in the WMP is just and reasonable for purposes of cost recovery. The CPUC also has enforcement authority with regard to an IOU’s progress and performance on their WMPs.
De-energization Notification Protocols Implemented by the CPUC – Starting in 2012, the CPUC has released protocols for utilities to follow during de-energization events. The first Public Safety Power Shutoff (PSPS) guidance released by the CPUC was specifically for SDG&E and required notification of customers.[7] In 2018, the CPUC adopted Resolution ESRB-8, which extended the requirements of the 2012 guidance for SDG&E to all electric investor-owned utilities (IOUs).[8] Among other provisions, the resolution required customer notifications prior to a de-energization event, and required notification to the Safety and Enforcement Division once the de-energization decision is made, and within 30 minutes after the last service is restored.
In 2019, the CPUC implemented Phase 1 PSPS notification guidelines.[9] The Commission stated that electric IOUs should, whenever possible, adhere to the following minimum notification timeline:
- 48-72 hours in advance of anticipated de-energization: notification of public safety partners priority notification entities.
- 24-48 hours in advance of anticipated de-energization: notification of all other affected customers.
- 1-4 hours in advance of anticipated de-energization, if possible: notification of all affected customers.
- When de-energization is initiated: notification of all affected customers.
- Immediately before re-energization begins: notification of all affected customers.
- When re-energization is complete: notification of all affected customers.
In 2020, Phase 2 guidelines directed electric IOUs to provide enhanced customer-friendly communication during all phases of a PSPS event, minimize the impact on customers, and increase accountability with regional Working Groups and in reports. In 2021, Phase 3 guidelines were implemented and are ongoing. They require IUOs to take a results-based approach to improve notification and mitigate the impacts of PSPS events. They also include reporting requirements.
Current reporting requirements mandate that IOUs submit a report to the Director of Safety and Enforcement Division at the CPUC within 10 business days after each de-energization event. This also applies to high-threat events where the IOU provided notifications to local government, agencies, and customers of possible de-energization though no de-energization occurred. These reports include at a minimum the following information[10]:
- The local communities’ representatives the IOU contacted prior to de-energization, the date on which they were contacted, and whether the areas affected by the de-energization are classified as Zone 1, Tier 2, or Tier 3 as per the definition in General Order 95, Rule 21.2-D.
- If an IOU is not able to provide customers with notice at least 2 hours prior to the de-energization event, the IOU shall provide an explanation in its report.
- The IOU shall summarize the number and nature of complaints received as the result of the de-energization event and include claims that are filed against the IOU because of de-energization.
- The IOU shall provide detailed description of the steps it took to restore power.
- The IOU shall identify the address of each community assistance location during a de-energization event, describe the location (in a building, a trailer, etc.), describe the assistance available at each location, and give the days and hours that it was open.
Southern California Fires of 2025 – On January 2, 2025, SCE initiated a PSPS event and de-energized 363,196 customer accounts.[11] These accounts include 11,740 Medical Baseline customer accounts, 90,632 Access and Functional Needs customer accounts, and 6,800 critical facilities accounts.[12] Fifteen days later, in the afternoon of January 17, 2025, SCE restored power to all customers.[13] According to the Public Advocates Office, during the Southern California fires in 2025, SCE failed to send 307,211 required notifications to Public Safety Partners, Critical Facilities and Infrastructure, and customers.[14] Cal Advocates found that the events in 2025 continued a pattern of failure of SCE to provide its customers with advance notification prior to de-energization.
COMMENTS:
- Author’s Statement. According to the author: “SB 292 plays a crucial role by providing detailed historical and natural disaster-related data on power outages, which is essential for developing robust resilience planning strategies. As a state, it is imperative that we gain a deep understanding of the complexities surrounding demographic and socioeconomic factors to effectively enhance our planning efforts. This comprehensive data will serve as a guiding light, allowing us to identify and prioritize investments in the most vulnerable areas and implement tailored local solutions that can offer critical support during disasters, outages, and crises. SB 292 aims to bridge the critical divide between utility reporting and community resilience planning. By doing so, it enables us to utilize outage data not merely as numbers, but as a meaningful lens through which we can better understand and address the far-reaching impacts of outage durations on our most vulnerable populations.”
- Purpose of the Bill. The inadequacies of communication and community outreach surrounding the deenergization events in Southern California this last January have led to significant scrutiny. The goal of the bill is to address PSPS protocols and reliability by first collecting more data after deenergization events occur. Some of the reporting included in the bill is already mandated by the CPUC on IOUs, as outlined above.
- Identifying the proper representative for the access and functional needs population. The bill requires the IOUs to work with “persons from the access and functional needs population” to develop and make publicly available a plan to support them during a deenergization event. It is the committee’s perspective that community organizations and state agencies that advocate for the functional needs community, which receive input from a broad and diverse population, are better suited to work with IOUs to generate this plan. The Committee recommends changing the language to include such community organizations and state agencies.
- Parity in reliability reporting between IOUs and POUs. The author’s goal is to gain better data regarding reliability. The bill puts reliability reporting for both IOUs and POUs into statute, with differences in the requirements. Therefore, it is the committee’s recommendation to mandate similar reporting requirements across IOU and POU territory in statute. The committee recommends adding language to this effect, while maintaining appropriate regulatory authority. The CPUC will make decisions regarding the content of these reports for IOUs and will collect them from the IOUs. The local governing body will make decisions regarding the content of these reports for their local POU, and the CEC will collect them from the POUs.
- Additional Amendments. The bill requires additional clean-up or reorganization for clarity. The committee recommends accepting all of these changes.
- Related Legislation.
AB 1410 (Garcia, 2025) requires that all public utilities automatically enroll their customers in alerts for service outages and updates. Additionally requires public utilities to provide both an opt-out provision to decline alerts, with exceptions, and the ability for customers to update contact information through email and telephone. Status: The bill is pending in the Senate Committee on Appropriations.
AB 825 (Petrie-Norris, 2025) proposes a range of policies affecting electrical corporations, specifically measures to address rising utility bills, including a prohibition on allowing electrical corporations to include $15 billion in undergrounding capital investments in their rate base for purposes of earning equity returns; establishing a public financing mechanism to reduce costs associated with the development of eligible transmission projects; establishing a task force to review various customer demand side management programs; creating a local permitting program to provide incentives and a pool of experts to aide local agencies in siting clean energy projects; and revising wildfire mitigation planning. Status: The bill is pending in the Senate Committee on Energy, Utilities and Communications.
SB 254 (Becker, 2025), among others, includes various proposals to address electric utility bill affordability, including requirements to consider the time required to implement an action and the amount of risk reduced when electric utilities implement wildfire mitigation strategies. Status: The bill is pending in the Assembly Committee on Utilities and Energy.
SB 256 (Perez, 2025), among others, includes provisions related to addressing wildfire mitigation by electrical corporations. Status: The bill is pending in the Assembly Committee on Utilities and Energy.
SB 332 (Wahab, 2025), among others, includes provisions requiring the consideration of undergrounding electrical infrastructure IOUs wildfire mitigation plan. Status: The bill is pending in the Assembly Committee on Utilities and Energy.
SB 559 (Stern, 2025) requires electrical corporations to provide specified notifications of deenergization events related to mitigating wildfire ignition risks, and requires specified reporting to, and oversight by, the CPUC. Status: The bill was held in the Senate Appropriations Committee.
SB 797 (Choi, 205) requires the CPUC to establish a working group and develop a report related to wildfire mitigation. Status: The bill was held in the Senate Appropriations Committee.
- Past Legislation.
SB 1003 (Dodd, 2024) modified timelines relevant to the wildfire mitigation plans by electrical corporations and requires the electrical corporations to take into account both the time required to implement an action and the amount of risk reduced for the costs and risk remaining. Status: The bill was held on the Assembly Floor.
SB 884 (McGuire) required the CPUC to establish an expedited electric utility distribution infrastructure undergrounding program for large electrical corporations. Status: Chapter 819, Statutes of 2022
SB 533 (Stern) required electrical corporations to identify circuits that have frequently been deenergized to mitigate the risk of wildfire and the measures taken to reduce the need for future deenergization of those circuits, as specified. Status: Chapter 244, Statutes of 2021
AB 1054 (Holden) included numerous provisions related to addressing wildfires caused by electric utility infrastructure, including: bolstering safety oversight and processes, recasting recovery of costs from damages to third-parties, including the authorization for an electrical corporation and ratepayer jointly funded Wildfire Fund to address future damages. Status: Chapter 79, Statutes of 2019
SB 167 (Dodd) required electrical corporations to include impacts on customers enrolled in specified programs as part of the protocols for deenergizing portions of their distribution system within their WMP. Status: Chapter 403, Statutes of 2019
SB 901 (Dodd) addressed numerous issues concerning wildfire prevention, response and recovery, including funding for mutual aid, fuel reduction and forestry policies, WMP by electric utilities, and cost recovery by electric corporations of wildfire-related damages. Status: Chapter 626, Statutes of 2018
SB 1028 (Hill) required electric CPUC-regulated utilities to file annual WMPs and requires the CPUC to review and comment on those plans. Status: Chapter 598, Statutes of 2016
REGISTERED SUPPORT / OPPOSITION:
Support
Easterseals Northern California
Oppose
None on file.
Oppose Unless Amended
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison
Analysis Prepared by: Kristen Koenig / U. & E. / (916) 319-2083
CPUC, Decision 16-01-008 ↑
https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/infrastructure/electric-reliability/electric-system-reliability-annual-reports, accessed July 6, 2025 ↑
https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/infrastructure/electric-reliability/electric-system-reliability-annual-reports, accessed July 6, 2025 ↑
AB 1054 (Holden, Chapter 79, Statutes of 2019) ↑
AB 111 (Committee on Budget, Chapter 81, Statutes of 2019) ↑
“Maximum feasible” means capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, legal, social, and technological factors. Public Utilities Code § 326 ↑
CPUC, Decision 12-04-024 April 19, 2012 ↑
CPUC, Resolution ESRB-8, Electric Safety and Reliability Branch July 12, 2018 ↑
CPUC, Decision 19-05-042, May 30, 2019 ↑
CPUC, Resolution ESRB-8, July 12, 2018 ↑
Southern California Edison, January 2, 2025 to January 17, 2025, March 3, 2025 (SCE 25-1 Post-Event Data Workbook), Table 5. ↑
CPUC, Decision 19-05-042, May 30, 2019 ↑
SCE 25-1 Post-Event Data Workbook, Table 5. ↑
Comments of the Public Advocates Office on Southern California Edison Company’s Public Safety Power Shutoff Post-Event Report - January 2 TO 17, 2025, Rulemaking 18-12-005, March 18, 2025 ↑
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 292 |
THIRD READING
Bill No: SB 292
Author: Cervantes (D)
Amended: 5/5/25
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 16-0, 4/29/25
AYES: Becker, Ochoa Bogh, Allen, Archuleta, Arreguín, Ashby, Caballero, Dahle, Gonzalez, Hurtado, Limón, McNerney, Rubio, Stern, Strickland, Wahab
NO VOTE RECORDED: Grove
SENATE APPROPRIATIONS COMMITTEE: 6-0, 5/23/25
AYES: Caballero, Seyarto, Cabaldon, Grayson, Richardson, Wahab
NO VOTE RECORDED: Dahle
SUBJECT: Electricity: wildfire mitigation: deenergization events and reliability
SOURCE: Author
DIGEST:
This bill requires specified data reporting by electrical corporations and local publicly owned utilities concerning annual electric reliability reports. This bill also requires the California Public Utilities Commission (CPUC) to consider new reporting requirements of electrical corporations within the annual reliability reports and the post-deenergization event reports.
ANALYSIS:
Existing law:
- Establishes the CPUC with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires every public utility to furnish and maintain adequate, efficient, just, and reasonable service, instrumentalities, equipment, and facilities, as are necessary to promote the safety, health, comfort, and convenience of its patrons, employees, and the public. (Public Utilities Code §451)
- Requires the CPUC to adopt inspection, maintenance, repair, and replacement standards, for the distribution systems of electrical corporations and requires the standards or rules to provide for high-quality, safe, and reliable service. Requires the CPUC to adopt standards for operation, reliability, and safety during periods of emergency and disaster. (Public Utilities Code §364)
- Establishes the policy of the state that each electrical corporation is required to continue to operate its electric distribution grid in its service territory and to do so in a safe, reliable, efficient, and cost-effective manner. (Public Utilities Code §399.2(a))
- Authorizes the CPUC to supervise and regulate every public utility in the state and to do all things necessary and convenient in the exercise of such power and jurisdiction. (Public Utilities Code §701)
- Requires the CPUC to require an electrical corporation to include in its annual reliability report information on the reliability of service to end-use customers that identifies the frequency and duration of interruptions of service. (Public Utilities Code §2774.1)
- Requires an electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. (Public Utilities Code §8386 (a))
- Requires electrical corporations, local electric publicly owned utilities (POUs), and electrical cooperatives to annually prepare wildfire mitigation plans (WMPs) that include, among other things, descriptions of protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety and protocols related to mitigating public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system. (Public Utilities Code §8386 (b))
- Requires the WMPs of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits. (Public Utilities Code §8386 (c)(8))
- Defines “access and functional needs population” consists of individuals who have developmental or intellectual disabilities, physical disabilities, chronic conditions, injuries, limited English proficiency or who are non-English speaking, older adults, children, people living in institutionalized settings, or those who are low income, homeless, or transportation disadvantaged, including, but not limited to, those who are dependent on public transit or those who are pregnant relative to a local jurisdiction’s emergency plan. (Government Code §8593.3(f))
- Defines “disadvantaged community” to be areas disproportionately affected by environmental pollution and areas with concentrations of people who are low-income, among other factors. (Health and Safety Code §39711)
This bill:
- Requires the CPUC, on or before January 1, 2027, to determine whether the annual electric reliability report prepared by an electrical corporation should include specified information, including: system- and division-level reliability and reliability statistics at census tracts or smaller resolutions.
- Requires a local electric POU to prepare an annual electric reliability report that is equivalent to those prepared by an electrical corporation, and provides that the report may include reliability statistics at census-tracts or smaller resolution.
- Imposes a state-mandated local program by imposing additional duties on a local electric POU.
- Requires electrical corporations to work with persons from the access and functional needs population to develop and make publicly available a plan to support that population during deenergization events.
- Requires electrical corporations, after each deenergization event, to prepare a post-deenergization event report containing certain information related to the event, including the number and types of customers affected, and the number of customers who receive financial assistance.
- Requires the CPUC, on or before January 1, 2027, to determine whether that report should include other specified information, including census-tract level information and whether the census-tract is identified as a disadvantaged community.
- Requires the report to be provided to the locally elected body and specified individuals of the cities and counties affected by the deenergization event.
Background
Electric reliability annual reporting. Pursuant to CPUC decisions (D. 16-01-008 and D. 96-09-045) and statute, electrical corporations are required to annually prepare electric system reliability reports detailing the previous year’s electric reliability on their respective system and division levels based on recorded average outage duration and frequency. Electric system reliability metrics are defined by the Institute of Electrical and Electronics Engineers in standard IEEE 1366 – Guide for Electric Power Distribution Reliability Indices. The reports are required to be submitted to the CPUC on July 15th. Additionally, the CPUC requires electrical corporations to make reliability data available to the public upon request.
The CPUC requires electrical corporations to report on the following four metrics annually:
- System Average Interruption Duration Index (SAIDI) – measures the average total minutes of outage that a customer on the system experienced in the reporting year.
- System Average Interruption Frequency Index (SAIFI) – measures the average number of sustained outages (i.e., outages greater than five minutes in duration) that a customer on the system experienced in the reporting year.
- Customer Average Interruption Duration Index (CAIDI) – measures the average duration of a single sustained outage (i.e., an outage that lasted longer than five minutes) that a customer experienced in the reporting year.
- Momentary Average Interruption Duration Index (MAIFI) – measures the average number of momentary outages (i.e., outages that lasts less than five minutes) that a customer experienced in the reporting year.
The CPUC requires the above metrics to be reported with, and without, the inclusion of Major Event Days (MEDs). MEDs are defined by IEEE 1366 as days in which the daily SAIDI of an event exceeds a statistically defined threshold based on the previous five years of daily SAIDI data. According to the CPUC website, this threshold excludes all but the worst 0.63% of outage events, making MEDs low frequency, high consequence events. The cause of an outage has no bearing on whether it will be classified as an MED. Deenergization events understood as proactive power shutoffs by electrical corporations to reduce the risks of fires (coined as Public Safety Power Shutoff (PSPS) events) are considered MEDs only insofar as they exceed the statistically defined threshold for MEDs.
Deenergization events. In recent years, California has experienced a number of catastrophic wildfires, including several ignited by electrical utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Risks for wildfires also increased with extended drought and bark beetle infestation that has increased tree mortalities and, as a result, increased the fuel, and risk for wildfires. As a result, electrical corporations have increasingly utilized proactive power shutoffs, deenergization of electric distribution (and sometimes transmission) lines, as a tool to prevent igniting wildfires, particularly during high wind event days with dry ground conditions. Although the use of proactive power shutoffs were met with opposition and concerns about its use by affected communities, ultimately the CPUC acknowledged electrical corporations’ authority to deenergize lines in order to protect public safety, noting this authority in Public Utilities Code §451 and §399.2.
Oversight and post-event reporting of deenergization events. The CPUC adopted protocols for deenergizing electric lines with a focus on who should receive notice and when, who should be responsible for notification, how different customer groups should be identified, the information that should be included in notifications in advance of and directly preceding a deenergizing event, the methods of communication, and how the electrical corporations should communicate and coordinate with public safety partners before, during, and after an event. The protocols require electrical corporations to develop work groups that include representative of the access and functional needs population. As the protocols have evolved over the years, there has been expanded requirements to develop needs assessments and plans to coordinate with identified access and functional needs population. Electrical corporations are also required to incorporate their protocols and procedures for proactive power shutoffs, as required by CPUC rules, within their WMPs. Additionally, the CPUC requires electrical corporations to provide post-event reports after each deenergization event with specified information, including: a list of circuits deenergized, its corresponding county, number of customers affected, and whether those customers are identified as requiring additional energy for medical reasons (medical baseline) or access and functional needs and maps of the affected areas. Electrical corporations must file these reports within 10 business days of restoration of service following a deenergization event (with some opportunity to extend the deadline).
Comments
Need for this bill. According to the author’s office,
The bill is designed to furnish valuable insights into affected communities through a process of community-engaged vulnerability analysis and mitigation initiatives. By assessing energization events and collecting relevant data proactively, we can take pre-emptive measures to address potential crises. Our state must grasp the risks that its diverse communities face regarding power outages to pursue innovative and effective resilience solutions.
It is particularly important to highlight that individuals across different income levels and privilege spectrums—especially those who have been historically marginalized and low-income—are disproportionately affected by outages. These communities often deal with overlapping vulnerabilities such as inadequate infrastructure, limited access to resources, and social isolation, which can severely impede their ability to recover from disasters.
January 2025 Santa Ana wind events. This January, with expected severe Santa Ana winds, low-humidity, high vegetation growth from previous wet winters, and dry conditions due to delayed precipitation, Southern California was at high risk for wildfires. Additionally, aerial fire suppression was limited by the extreme winds, which included gusts approaching 100 mph in some areas. In the case of Southern California Edison (SCE), the proactive power shutoffs resulted in extended outages throughout their service territory impacting upwards of over 500,000 customer accounts (affecting many times more individuals) between January 2 through January 27, including two separate (and, in some cases, overlapping) events. These deenergization events coincided with several wildfires in the broader region, including two large catastrophic fires, the Palisades Fire and the Eaton Fire (fire investigations as to the cause of these fires are still in process, ignition cause has not been determined). Based on SCE’s post-event reports, the proactive power shutoffs were the largest number of affected customers since the tool had been deployed by the utility and likely the largest in duration for the utility. These events resulted in many frustrations for customers and local governments as the utility’s execution of the proactive power shutoffs seems to have been greatly challenged by the scale and duration of the events with reports that their website crashed, inadequate notifications to customers, inability of some local governments to reach a utility point person, and inaccurate maps displayed at times on their websites. SCE also adjusted their operational thresholds in the midst of the events due to the evolving conditions which resulted in many customers unexpectedly experiencing proactive power shutoff without any advance notification. SCE’s post-event reports also indicated nearly 100 incidents of damage on deenergized facilities that, if they had been energized, could have been a significant risk to igniting wildfires.
Desire for more granular data. The proactive power shutoffs executed by SCE in January of this year left customers across their service territory without power and, in some cases, without any advanced notification. The author’s office notes their district was among the very hard-hit from the power outages, as power was shutoff for nearly a week in areas that had never experienced proactive power shutoffs. This bill requires additional data to better understand the impacts of these power shutoffs and other power outage events at a more granular level, specifically at the census-tract level and with identification for disadvantaged communities with the premise of better understanding any disproportionate effect on these communities. This bill also requires electrical corporations to work with the access and functional needs population to plan for deenergization events. The author’s office has shared this is intended to reflect the existing requirements and practice of the CPUC deenergization protocols.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee, the California Public Utilities Commission (CPUC) estimates one-time costs of $257,000 (ratepayer funds) to determine whether post-deenergization reports should include more information than currently required by January 1, 2027, among other things.
SUPPORT: (Verified 5/22/25)
None received
OPPOSITION: (Verified 5/22/25)
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison
ARGUMENTS IN SUPPORT: According to the author:
SB 292 plays a crucial role by providing detailed historical and natural disaster-related data on power outages, which is essential for developing robust resilience planning strategies. As a state, it is imperative that we gain a deep understanding of the complexities surrounding demographic and socioeconomic factors to effectively enhance our planning efforts. This comprehensive data will serve as a guiding light, allowing us to identify and prioritize investments in the most vulnerable areas and implement tailored local solutions that can offer critical support during disasters, outages, and crises.
ARGUMENTS IN OPPOSITION: PG&E, SCE, and SDG&E state:
The Joint Utilities appreciate the desire to ensure utility reports provide meaningful information; however, SB 292 presents significant new costs and is redundant to existing regulations that would ultimately harm ratepayers without providing commensurate benefits. The Joint Utilities recommend amendments to SB 292 to remove the provisions that conflict with existing CPUC requirements and discount the value of input from impacted stakeholders that have been instrumental in developing and refining these programs and reports.
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
5/25/25 14:55:53
**** END ****
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
SB 292 (Cervantes) - Electricity: wildfire mitigation: deenergization events and reliability
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would require specified data reporting by electrical corporations concerning deenergization events and reliability reports.
Fiscal Impact:
- The California Public Utilities Commission (CPUC) estimates one-time costs of $257,000 (ratepayer funds) to determine whether post-deenergization reports should include more information than currently required by January 1, 2027, among other things.
Background:
California wildfire and electric utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Risks for wildfires also increased with the extended drought and bark beetle infestation that has increased tree mortalities and, as a result, increased the fuel, and risk for wildfires. In recent years, California has experienced a number of catastrophic wildfires, including several ignited by electrical utility infrastructure.
Deenergizing electric lines. Generally, electric utilities attempt to maintain power and ensure continued reliability of the flow of electricity. However, catastrophic fires in recent years have demonstrated the risk of ignition by electric utility infrastructure can pose great damage and loss of life, perhaps greater than the risks of turning off the power to certain electrical circuits. As a safety consideration, electric utilities have the ability and authority to deenergize electric lines in order to prevent harm or threats of harm. However, deenergizing electric lines can result in the loss of electricity to households, businesses, traffic signals, communication systems, water treatment facilities, emergency services and other critical which can also cause harm, as well as, economic impacts to residents and businesses. Therefore, efforts to deenergize electric lines must consider the potential harm of the energized lines causing a wildfire against the safety hazards associated with eliminating electricity to the areas served by the line(s).
Proposed Law:
This bill would require specified data reporting by electrical corporations concerning deenergization events and reliability reports. Specifically, it would:
- Require electrical corporations to work with persons from the access and functional needs population, as defined, to develop and make publicly available a plan to support that population during deenergization events, as provided.
- Require electrical corporations, after each deenergization event, to prepare a post-deenergization event report, as provided, and require the report to be provided to the locally elected body and specified individuals of the cities and counties affected by the deenergization event. Require the CPUC, on or before January 1, 2027, to determine whether that report should include other specified information.
- Require local electric POUs to prepare annual reliability reports that are equivalent to those prepared by electrical corporations.
- By imposing additional duties on a local publicly owned electric utility, the bill would impose a state-mandated local program. Provide that no reimbursement would be required for specified reasons.
Related Legislation:
SB 254 (Becker) of the current legislative session, includes various proposals to address electric utility bill affordability, including requirements to consider the time required to implement an action and the amount of risk reduced when electric utilities implement wildfire mitigation strategies.
SB 256 (Perez) of the current legislative session, includes various provisions related to addressing wildfire mitigation by electrical corporations.
SB 332 (Wahab) of the current legislative session, includes various proposals, including consideration of underground of electrical infrastructure within an electrical corporation’s wildfire mitigation plan.
SB 559 (Stern) of the current legislative session, would require electrical corporations to provide specified notifications of deenergization events related to mitigating wildfire ignition risks, and requires specified reporting to, and oversight by, the CPUC.
SB 797 (Choi) of the current legislative session, would require the CPUC to establish a working group and develop a report related to wildfire mitigation.
SB 1003 (Dodd) of 2024, would have modified timelines relevant to the wildfire mitigation plans by electrical corporations and requires the electrical corporations to take into account both the time required to implement an action and the amount of risk reduced for the costs and risk remaining. The bill was held on the Assembly Floor.
SB 884 (McGuire, Chapter 819, Statutes of 2022) required the CPUC to establish an expedited electric utility distribution infrastructure undergrounding program for large electrical corporations.
SB 533 (Stern, Chapter 244, Statutes of 2021) required electrical corporations to identify circuits that have frequently been deenergized to mitigate the risk of wildfire and the measures taken to reduce the need for future deenergization of those circuits, as specified.
AB 1054 (Holden, Chapter 79, Statutes of 2019) included numerous provisions related to addressing wildfires caused by electric utility infrastructure, including: bolstering safety oversight and processes, recasting recovery of costs from damages to third-parties, including the authorization for an electrical corporation and ratepayer jointly funded Wildfire Fund to address future damages.
SB 167 (Dodd, Chapter 403, Statutes of 2019) required electrical corporations to include impacts on customers enrolled in specified programs as part of the protocols for deenergizing portions of their distribution system within their WMP.
SB 901 (Dodd, Chapter 626, Statutes of 2018) addressed numerous issues concerning wildfire prevention, response and recovery, including funding for mutual aid, fuel reduction and forestry policies, WMP by electric utilities, and cost recovery by electric corporations of wildfire-related damages.
SB 1028 (Hill, Chapter 598, Statutes of 2016) required electric CPUC-regulated utilities to file annual WMPs and requires the CPUC to review and comment on those plans.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Josh Becker, Chair
2025 - 2026 Regular
Bill No: SB 292 Hearing Date: 4/29/2025
Author: | Cervantes | ||
Version: | 4/9/2025 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Nidia Bautista | ||
SUBJECT: Electricity: wildfire mitigation: deenergization events and undergrounding plans
DIGEST: This bill requires specified data reporting by electrical corporations, local publicly owned utilities, and electric cooperatives concerning deenergization events and reliability reports.
ANALYSIS:
Existing law:
- Establishes the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Establishes the Office of Energy Infrastructure Safety (OEIS) is the successor to, and, effective July 1, 2021, is vested with, all of the duties, powers, and responsibilities of the Wildfire Safety Division within the CPUC established pursuant to Section 326 of the Public Utilities Code, including, but not limited to, the power to compel information and conduct investigations. (Government Code §15475)
- Requires every public utility to furnish and maintain adequate, efficient, just, and reasonable service, instrumentalities, equipment, and facilities, as are necessary to promote the safety, health, comfort, and convenience of its patrons, employees, and the public. (Public Utilities Code §451)
- Establishes the policy of the state that each electrical corporation is required to continue operate its electric distribution grid in its service territory and to do so in a safe, reliable, efficient, and cost-effective manner. (Public Utilities Code §399.2(a))
- Authorizes the CPUC to supervise and regulate every public utility in the state and to do all things necessary and convenient in the exercise of such power and jurisdiction. (Public Utilities Code §701)
- Requires an electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. (Public Utilities Code §8386 (a))
- Requires electrical corporations, local electric publicly owned utilities (POUs), and electrical cooperatives to annually prepare wildfire mitigation plans (WMPs) that include, among other things, descriptions of protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety and protocols related to mitigating public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system. (Public Utilities Code §8386 (b))
- Requires a WMP of an electrical corporation to include, among other things, protocols for deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, and protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communications infrastructure. (Public Utilities Code §§8386 (c)(6))
- Requires a WMP plan of an electrical corporation to also include appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines and requires these procedures to consider the need to notify, as a priority, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of a potential deenergization event. (Public Utilities Code §8386 (c)(7))
- Requires the WMPs of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits. (Public Utilities Code §8386 (c)(8))
- Requires the CPUC to require an electrical corporation to include in its annual reliability report information on the reliability of service to end-use customers that identifies the frequency and duration of interruptions of service. (Public Utilities Code §2774.1)
- Requires the CPUC to establish an expedited utility distribution undergrounding program. Requires large electrical corporations, to participate in the program, to submit to the OEIS a distribution infrastructure undergrounding plan meeting certain requirements. (Public Utilities Code §8388.5)
This bill:
- Requires electrical corporations, local electric POUs, and electrical cooperatives to work with persons from the access and functional needs population, as defined, to develop and make publicly available a plan to support that population during deenergization events.
- Requires electrical corporations, local electric POUs, and electrical cooperatives, after each deenergization event, to prepare a report containing certain information related to the deenergization event, as provided, and requires the report to be provided to the locally elected body and specified individuals of the cities and counties affected by the deenergization event. Imposes a state-mandated local program by imposing additional duties on local agencies.
- Requires local electric POUs to prepare annual reliability reports that are equivalent to those prepared by an electrical corporation.
- Requires the reliability report prepared by electrical corporations and local electric POUs to include specified information, including, among other things, system- and division-level reliability and reliability statistics at census tracts or smaller resolutions. Imposes a state-mandated local program by imposing additional duties on local agencies.
- Requires OEIS to publish the undergrounding plan on its internet website.
Background
California wildfire and electric utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Risks for wildfires also increased with the extended drought and bark beetle infestation that has increased tree mortalities and, as a result, increased the fuel, and risk for wildfires. In recent years, California has experienced a number of catastrophic wildfires, including several ignited by electrical utility infrastructure.
Deenergizing electric lines. Generally, electric utilities attempt to maintain power and ensure continued reliability of the flow of electricity. However, catastrophic fires in recent years have demonstrated the risk of ignition by electric utility infrastructure can pose great damage and loss of life, perhaps greater than the risks of turning off the power to certain electrical circuits. As a safety consideration, electric utilities have the ability and authority to deenergize electric lines in order to prevent harm or threats of harm. However, deenergizing electric lines can result in the loss of electricity to households, businesses, traffic signals, communication systems, water treatment facilities, emergency services and other critical which can also cause harm, as well as, economic impacts to residents and businesses. Therefore, efforts to deenergize electric lines must consider the potential harm of the energized lines causing a wildfire against the safety hazards associated with eliminating electricity to the areas served by the line(s).
History with power shutoffs. Utilities have increasingly utilized proactive power shutoffs as a tool to prevent sparking ignitions. The practice of proactively deenergizing electric circuits to prevent catastrophic wildfire began by San Diego Gas & Electric (SDG&E) after several electric utility infrastructure-ignited catastrophic fires in 2007. Proactive power shutoffs were one of the many measures SDG&E implemented to reduce the risk of fire ignited by its infrastructure (other measures included installing steel poles and expanding ground and aerial inspections). Although the use of proactive power shutoffs were met with opposition and concerns about its use by communities, ultimately the CPUC acknowledged SDG&E’s authority to deenergize lines in order to protect public safety, noting this authority in Public Utilities Code §451 and §399.2. Since then, the practice has also been expanded and adopted by the state’s two largest electric utilities – Pacific Gas & Electric (PG&E) and Southern California Edison (SCE), as well as, the smaller investor-owned electric utilities (IOUs) and exploration by POUs.
Oversight of proactive power shutoffs. The CPUC adopted protocols for deenergizing electric lines with a focus on who should receive notice and when; who should be responsible for notification; how different customer groups should be identified; the information that should be included in notifications in advance of and directly preceding a deenergizing event; the methods of communication; and how the IOUs should communicate and coordinate with public safety partners before, during, and after an event. The CPUC is working with the Office of Emergency Services (OES), Cal FIRE, and first-responders to address potential impacts of utility deenergization practices on emergency response activities, including evacuations. The CPUC is also monitoring the development and continuously assessing implementation of deenergization programs by utilities, including performing a review of deenergization events. In adopting the initial protocols, the CPUC commissioners expressed a desire that the power shutoffs would only be used as a “last resort” by the utilities. However, the use of proactive power shutoffs by electric utilities became widespread and increased concerns that the practice is relied upon more frequently than a last resort. In some instances, deenergization events overlap and result in customers experiencing extended days with loss of power.
Wildfire Mitigation Plan. As a result of SB 1028 (Hill, Chapter 598, Statutes of 2016), and further expanded by SB 901 (Dodd, Chapter 626, Statutes of 2018) and AB 1054 (Holden, Chapter 79, Statutes of 2019), electric IOUs are required to file WMPs with guidance by OEIS (as of 2021). OEIS reviews and determines whether to approve these plans and ensures compliance with guidance and statute. The electric IOUs’ WMPs detail, describe and summarize electric IOU responsibilities, actions, and resources to mitigate wildfires. These actions include plans to harden their system to prevent wildfire ignitions caused by utility infrastructure, such as widespread electric line replacement with covered conductors designed to lower wildfire ignition, pole replacement, and other actions. The plans also include information regarding the electric IOUs’ efforts to conduct extensive vegetation management to reduce the risk of tree branches, grasses, and other vegetation from coming into contact with utility infrastructure. The WMPs also require electric utilities to incorporate their protocols and procedures for proactive power shutoffs as required by CPUC rules.
Proactive power shutoff protocols. Over several years, the proactive power shutoff protocols have evolved via CPUC oversight and various CPUC decisions. The protocols include specified requirements related to advance planning with public safety partners and local governments, as well as, specified notifications to customers prior to, during, and after deenergization events. The protocols also require specified actions to address the public safety impacts for critical facilities and access and functional needs populations, among others. The CPUC and Legislature have exercised continued oversight of the utilities’ practices with the goal of minimizing the use of power shutoffs and accelerating wildfire mitigation to reduce risks of the electrical infrastructure igniting fires. However, proactive power shutoffs continue to be a tool in the electric utility’s toolbox to mitigate wildfire ignition risks. Currently, CPUC notifications require specified timing of notifications to customers and an extended (and continually evolving) list of public safety partners and critical facilities, including emergency services, government facilities, medical facilities, energy facilities, drinking water and wastewater treatment facilities, communications facilities, and others. The protocols require electric IOUs to, whenever possible, adhere to minimum notification timelines.
January 2025 Santa Ana wind events. This January, with expected severe Santa Ana winds, low-humidity, high vegetation growth from previous wet winters, and dry conditions due to delayed precipitation, Southern California was at high risk for wildfires. Additionally, aerial fire suppression was limited by the extreme winds, which included gusts approaching 100 mph in some areas. Both SCE and SDG&E executed proactive power shutoffs in their service territory as a public safety measure. In the case of SCE, the proactive power shutoffs resulted in extended outages throughout their service territory impacting upwards of 500,000 plus customer accounts (affecting many times more individuals) between January 2 through January 27, including two separate (and, in some cases overlapping) events. These deenergization events coincided with several wildfires in the area, including two large catastrophic fires, the Palisades Fire and the Eaton Fire (fire investigations as to the cause of these fires are still in process, ignition cause has not been determined). Based on SCE’s post-event reports, the proactive power shutoffs were the largest number of affected customers since the tool had been deployed and likely the largest in duration. These events resulted in many frustrations for customers and local governments as the utility’s execution of the proactive power shutoffs seems to have been greatly challenged by the scale and duration of the events (official CPUC oversight and review of these events is in process) with reports that their website crashed, inadequate notifications to customers, inability of some local governments to reach a utility point person, and inaccurate maps displayed at times on their websites. SCE also adjusted their operational thresholds in the midst of the events due to the evolving conditions which resulted in many customers unexpectedly experiencing proactive power shutoff without any advance notification. SCE’s post-event reports also indicated nearly 100 incidents of damage on deenergized facilities that, if they had been energized, could have been a significant risk to igniting wildfires.
Comments
Need for this bill. According to the author’s office,
The bill is designed to furnish valuable insights into affected communities through a process of community-engaged vulnerability analysis and mitigation initiatives. By assessing energization events and collecting relevant data proactively, we can take pre-emptive measures to address potential crises. Our state must grasp the risks that its diverse communities face regarding power outages to pursue innovative and effective resilience solutions.
It is particularly important to highlight that individuals across different income levels and privilege spectrums—especially those who have been historically marginalized and low-income—are disproportionately affected by outages. These communities often deal with overlapping vulnerabilities such as inadequate infrastructure, limited access to resources, and social isolation, which can severely impede their ability to recover from disasters.
January 2025 power shutoffs and author’s desire for more data. The proactive power shutoffs executed by SCE in January left customers across their service territory without power and, in some cases, without advanced notification. The author’s office notes their district was among the very hard-hit, as power was shutoff for nearly a week in areas that had never experienced proactive power shutoffs. This bill attempts require additional data to better understand the impacts of these power shutoffs and other power outage events. While the data can be useful, it is not clear how disruptive or feasible the additional requirements would be to the existing reliability reporting already required or the post-event deenergization reporting. In this regard, the author and committee may wish to amend the language in this bill:
- Concerning the reliability report and post-deenergization event reporting, require the CPUC, in each case, in a new or existing proceeding, consider whether the specific information should be additional requirements placed on the electrical corporations’ annual reliability reports or deenergization post-event reports, respectively.
- Delete the references to the local publicly owned electric utilities and electrical cooperatives in Section 2 and recast the language to make clear it is consistent with the existing deenergization protocols adopted by the CPUC.
- Delete Section 4 of the bill concerning the expedited undergrounding program.
- With regards to Section 5, make clear the publicly owned utilities may include information that is relevant to their service territory.
Prior/Related Legislation
SB 254 (Becker) of the current legislative session, includes various proposals to address electric utility bill affordability, including requirements to consider the time required to implement an action and the amount of risk reduced when electric utilities implement wildfire mitigation strategies. The bill is pending in this committee.
SB 256 (Perez) of the current legislative session, includes various provisions related to addressing wildfire mitigation by electrical corporations. The bill is pending in this committee.
SB 332 (Wahab) of the current legislative session, includes various proposals, including consideration of underground of electrical infrastructure within an electrical corporation’s wildfire mitigation plan. The bill is pending in the Senate Appropriations Committee.
SB 559 (Stern) of the current legislative session, requires electrical corporations to provide specified notifications of deenergization events related to mitigating wildfire ignition risks, and requires specified reporting to, and oversight by, the CPUC. The bill is pending in the Senate Appropriations Committee.
SB 797 (Choi) of the current legislative session, requires the CPUC to establish a working group and develop a report related to wildfire mitigation. The bill is pending in this committee.
SB 1003 (Dodd) of 2024, would have modified timelines relevant to the wildfire mitigation plans by electrical corporations and requires the electrical corporations to take into account both the time required to implement an action and the amount of risk reduced for the costs and risk remaining. The bill was held on the Assembly Floor.
SB 884 (McGuire, Chapter 819, Statutes of 2022) required the CPUC to establish an expedited electric utility distribution infrastructure undergrounding program for large electrical corporations.
SB 533 (Stern, Chapter 244, Statutes of 2021) required electrical corporations to identify circuits that have frequently been deenergized to mitigate the risk of wildfire and the measures taken to reduce the need for future deenergization of those circuits, as specified.
AB 1054 (Holden, Chapter 79, Statutes of 2019) included numerous provisions related to addressing wildfires caused by electric utility infrastructure, including: bolstering safety oversight and processes, recasting recovery of costs from damages to third-parties, including the authorization for an electrical corporation and ratepayer jointly funded Wildfire Fund to address future damages.
SB 167 (Dodd, Chapter 403, Statutes of 2019) required electrical corporations to include impacts on customers enrolled in specified programs as part of the protocols for deenergizing portions of their distribution system within their WMP.
SB 901 (Dodd, Chapter 626, Statutes of 2018) addressed numerous issues concerning wildfire prevention, response and recovery, including funding for mutual aid, fuel reduction and forestry policies, WMP by electric utilities, and cost recovery by electric corporations of wildfire-related damages.
SB 1028 (Hill, Chapter 598, Statutes of 2016) required electric CPUC-regulated utilities to file annual WMPs and requires the CPUC to review and comment on those plans.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT:
None received
OPPOSITION, unless amended:
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison
ARGUMENTS IN SUPPORT: According to the author:
SB 292 plays a crucial role by providing detailed historical and natural disaster-related data on power outages, which is essential for developing robust resilience planning strategies. As a state, it is imperative that we gain a deep understanding of the complexities surrounding demographic and socioeconomic factors to effectively enhance our planning efforts. This comprehensive data will serve as a guiding light, allowing us to identify and prioritize investments in the most vulnerable areas and implement tailored local solutions that can offer critical support during disasters, outages, and crises.
…SB 292 aims to bridge the critical divide between utility reporting and community resilience planning. By doing so, it enables us to utilize outage data not merely as numbers, but as a meaningful lens through which we can better understand and address the far-reaching impacts of outage durations on our most vulnerable populations.
ARGUMENTS IN OPPOSITION: PG&E, SCE, and SDG&E state:
The bill’s expanded reporting requirements would be created outside established processes at the Commission that allow for deliberate development and adoption of standards based on feedback from interested stakeholders. Implementing SB 292’s provisions would require the Commission to reopen these proceedings and would necessitate collection and consideration of substantial stakeholder feedback, creating additional administrative burdens for utilities, stakeholders, and the Commission, and new investments in data systems by utilities, inevitably increasing customer costs.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Josh Becker, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 4/29/2025
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill requires specified data reporting by electrical corporations, local publicly owned utilities, and electric cooperatives concerning deenergization events and reliability reports.
ANALYSIS:
Existing law:
- Establishes the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Establishes the Office of Energy Infrastructure Safety (OEIS) is the successor to, and, effective July 1, 2021, is vested with, all of the duties, powers, and responsibilities of the Wildfire Safety Division within the CPUC established pursuant to Section 326 of the Public Utilities Code, including, but not limited to, the power to compel information and conduct investigations. (Government Code §15475)
- Requires every public utility to furnish and maintain adequate, efficient, just, and reasonable service, instrumentalities, equipment, and facilities, as are necessary to promote the safety, health, comfort, and convenience of its patrons, employees, and the public. (Public Utilities Code §451)
- Establishes the policy of the state that each electrical corporation is required to continue operate its electric distribution grid in its service territory and to do so in a safe, reliable, efficient, and cost-effective manner. (Public Utilities Code §399.2(a))
- Authorizes the CPUC to supervise and regulate every public utility in the state and to do all things necessary and convenient in the exercise of such power and jurisdiction. (Public Utilities Code §701)
- Requires an electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. (Public Utilities Code §8386 (a))
- Requires electrical corporations, local electric publicly owned utilities (POUs), and electrical cooperatives to annually prepare wildfire mitigation plans (WMPs) that include, among other things, descriptions of protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety and protocols related to mitigating public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system. (Public Utilities Code §8386 (b))
- Requires a WMP of an electrical corporation to include, among other things, protocols for deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, and protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communications infrastructure. (Public Utilities Code §§8386 (c)(6))
- Requires a WMP plan of an electrical corporation to also include appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines and requires these procedures to consider the need to notify, as a priority, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of a potential deenergization event. (Public Utilities Code §8386 (c)(7))
- Requires the WMPs of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits. (Public Utilities Code §8386 (c)(8))
- Requires the CPUC to require an electrical corporation to include in its annual reliability report information on the reliability of service to end-use customers that identifies the frequency and duration of interruptions of service. (Public Utilities Code §2774.1)
- Requires the CPUC to establish an expedited utility distribution undergrounding program. Requires large electrical corporations, to participate in the program, to submit to the OEIS a distribution infrastructure undergrounding plan meeting certain requirements. (Public Utilities Code §8388.5)
This bill:
- Requires electrical corporations, local electric POUs, and electrical cooperatives to work with persons from the access and functional needs population, as defined, to develop and make publicly available a plan to support that population during deenergization events.
- Requires electrical corporations, local electric POUs, and electrical cooperatives, after each deenergization event, to prepare a report containing certain information related to the deenergization event, as provided, and requires the report to be provided to the locally elected body and specified individuals of the cities and counties affected by the deenergization event. Imposes a state-mandated local program by imposing additional duties on local agencies.
- Requires local electric POUs to prepare annual reliability reports that are equivalent to those prepared by an electrical corporation.
- Requires the reliability report prepared by electrical corporations and local electric POUs to include specified information, including, among other things, system- and division-level reliability and reliability statistics at census tracts or smaller resolutions. Imposes a state-mandated local program by imposing additional duties on local agencies.
- Requires OEIS to publish the undergrounding plan on its internet website.
Background
California wildfire and electric utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Risks for wildfires also increased with the extended drought and bark beetle infestation that has increased tree mortalities and, as a result, increased the fuel, and risk for wildfires. In recent years, California has experienced a number of catastrophic wildfires, including several ignited by electrical utility infrastructure.
Deenergizing electric lines. Generally, electric utilities attempt to maintain power and ensure continued reliability of the flow of electricity. However, catastrophic fires in recent years have demonstrated the risk of ignition by electric utility infrastructure can pose great damage and loss of life, perhaps greater than the risks of turning off the power to certain electrical circuits. As a safety consideration, electric utilities have the ability and authority to deenergize electric lines in order to prevent harm or threats of harm. However, deenergizing electric lines can result in the loss of electricity to households, businesses, traffic signals, communication systems, water treatment facilities, emergency services and other critical which can also cause harm, as well as, economic impacts to residents and businesses. Therefore, efforts to deenergize electric lines must consider the potential harm of the energized lines causing a wildfire against the safety hazards associated with eliminating electricity to the areas served by the line(s).
History with power shutoffs. Utilities have increasingly utilized proactive power shutoffs as a tool to prevent sparking ignitions. The practice of proactively deenergizing electric circuits to prevent catastrophic wildfire began by San Diego Gas & Electric (SDG&E) after several electric utility infrastructure-ignited catastrophic fires in 2007. Proactive power shutoffs were one of the many measures SDG&E implemented to reduce the risk of fire ignited by its infrastructure (other measures included installing steel poles and expanding ground and aerial inspections). Although the use of proactive power shutoffs were met with opposition and concerns about its use by communities, ultimately the CPUC acknowledged SDG&E’s authority to deenergize lines in order to protect public safety, noting this authority in Public Utilities Code §451 and §399.2. Since then, the practice has also been expanded and adopted by the state’s two largest electric utilities – Pacific Gas & Electric (PG&E) and Southern California Edison (SCE), as well as, the smaller investor-owned electric utilities (IOUs) and exploration by POUs.
Oversight of proactive power shutoffs. The CPUC adopted protocols for deenergizing electric lines with a focus on who should receive notice and when; who should be responsible for notification; how different customer groups should be identified; the information that should be included in notifications in advance of and directly preceding a deenergizing event; the methods of communication; and how the IOUs should communicate and coordinate with public safety partners before, during, and after an event. The CPUC is working with the Office of Emergency Services (OES), Cal FIRE, and first-responders to address potential impacts of utility deenergization practices on emergency response activities, including evacuations. The CPUC is also monitoring the development and continuously assessing implementation of deenergization programs by utilities, including performing a review of deenergization events. In adopting the initial protocols, the CPUC commissioners expressed a desire that the power shutoffs would only be used as a “last resort” by the utilities. However, the use of proactive power shutoffs by electric utilities became widespread and increased concerns that the practice is relied upon more frequently than a last resort. In some instances, deenergization events overlap and result in customers experiencing extended days with loss of power.
Wildfire Mitigation Plan. As a result of SB 1028 (Hill, Chapter 598, Statutes of 2016), and further expanded by SB 901 (Dodd, Chapter 626, Statutes of 2018) and AB 1054 (Holden, Chapter 79, Statutes of 2019), electric IOUs are required to file WMPs with guidance by OEIS (as of 2021). OEIS reviews and determines whether to approve these plans and ensures compliance with guidance and statute. The electric IOUs’ WMPs detail, describe and summarize electric IOU responsibilities, actions, and resources to mitigate wildfires. These actions include plans to harden their system to prevent wildfire ignitions caused by utility infrastructure, such as widespread electric line replacement with covered conductors designed to lower wildfire ignition, pole replacement, and other actions. The plans also include information regarding the electric IOUs’ efforts to conduct extensive vegetation management to reduce the risk of tree branches, grasses, and other vegetation from coming into contact with utility infrastructure. The WMPs also require electric utilities to incorporate their protocols and procedures for proactive power shutoffs as required by CPUC rules.
Proactive power shutoff protocols. Over several years, the proactive power shutoff protocols have evolved via CPUC oversight and various CPUC decisions. The protocols include specified requirements related to advance planning with public safety partners and local governments, as well as, specified notifications to customers prior to, during, and after deenergization events. The protocols also require specified actions to address the public safety impacts for critical facilities and access and functional needs populations, among others. The CPUC and Legislature have exercised continued oversight of the utilities’ practices with the goal of minimizing the use of power shutoffs and accelerating wildfire mitigation to reduce risks of the electrical infrastructure igniting fires. However, proactive power shutoffs continue to be a tool in the electric utility’s toolbox to mitigate wildfire ignition risks. Currently, CPUC notifications require specified timing of notifications to customers and an extended (and continually evolving) list of public safety partners and critical facilities, including emergency services, government facilities, medical facilities, energy facilities, drinking water and wastewater treatment facilities, communications facilities, and others. The protocols require electric IOUs to, whenever possible, adhere to minimum notification timelines.
January 2025 Santa Ana wind events. This January, with expected severe Santa Ana winds, low-humidity, high vegetation growth from previous wet winters, and dry conditions due to delayed precipitation, Southern California was at high risk for wildfires. Additionally, aerial fire suppression was limited by the extreme winds, which included gusts approaching 100 mph in some areas. Both SCE and SDG&E executed proactive power shutoffs in their service territory as a public safety measure. In the case of SCE, the proactive power shutoffs resulted in extended outages throughout their service territory impacting upwards of 500,000 plus customer accounts (affecting many times more individuals) between January 2 through January 27, including two separate (and, in some cases overlapping) events. These deenergization events coincided with several wildfires in the area, including two large catastrophic fires, the Palisades Fire and the Eaton Fire (fire investigations as to the cause of these fires are still in process, ignition cause has not been determined). Based on SCE’s post-event reports, the proactive power shutoffs were the largest number of affected customers since the tool had been deployed and likely the largest in duration. These events resulted in many frustrations for customers and local governments as the utility’s execution of the proactive power shutoffs seems to have been greatly challenged by the scale and duration of the events (official CPUC oversight and review of these events is in process) with reports that their website crashed, inadequate notifications to customers, inability of some local governments to reach a utility point person, and inaccurate maps displayed at times on their websites. SCE also adjusted their operational thresholds in the midst of the events due to the evolving conditions which resulted in many customers unexpectedly experiencing proactive power shutoff without any advance notification. SCE’s post-event reports also indicated nearly 100 incidents of damage on deenergized facilities that, if they had been energized, could have been a significant risk to igniting wildfires.
Comments
Need for this bill. According to the author’s office,
The bill is designed to furnish valuable insights into affected communities through a process of community-engaged vulnerability analysis and mitigation initiatives. By assessing energization events and collecting relevant data proactively, we can take pre-emptive measures to address potential crises. Our state must grasp the risks that its diverse communities face regarding power outages to pursue innovative and effective resilience solutions.
It is particularly important to highlight that individuals across different income levels and privilege spectrums—especially those who have been historically marginalized and low-income—are disproportionately affected by outages. These communities often deal with overlapping vulnerabilities such as inadequate infrastructure, limited access to resources, and social isolation, which can severely impede their ability to recover from disasters.
January 2025 power shutoffs and author’s desire for more data. The proactive power shutoffs executed by SCE in January left customers across their service territory without power and, in some cases, without advanced notification. The author’s office notes their district was among the very hard-hit, as power was shutoff for nearly a week in areas that had never experienced proactive power shutoffs. This bill attempts require additional data to better understand the impacts of these power shutoffs and other power outage events. While the data can be useful, it is not clear how disruptive or feasible the additional requirements would be to the existing reliability reporting already required or the post-event deenergization reporting. In this regard, the author and committee may wish to amend the language in this bill:
- Concerning the reliability report to require the CPUC and post-deenergization event reporting to require the CPUC, in each case, in a new or existing proceeding, consider whether the specific information should be additional requirements placed on the electrical corporations’ annual reliability reports or deenergization post-event reports, respectively.
- Delete the references to the local publicly owned electric utilities and electrical cooperatives in Section 2 and recast the language to make clear it is consistent with the existing deenergization protocols adopted by the CPUC.
- Delete Section 4 of the bill concerning the expedited undergrounding program.
- With regards to Section 5, make clear the publicly owned utilities may include information that is relevant to their service territory.
Prior/Related Legislation
SB 254 (Becker) of the current legislative session, includes various proposals to address electric utility bill affordability, including requirements to consider the time required to implement an action and the amount of risk reduced when electric utilities implement wildfire mitigation strategies. The bill is pending in this committee.
SB 256 (Perez) of the current legislative session, includes various provisions related to addressing wildfire mitigation by electrical corporations. The bill is pending in this committee.
SB 332 (Wahab) of the current legislative session, includes various proposals, including consideration of underground of electrical infrastructure within an electrical corporation’s wildfire mitigation plan. The bill is pending in the Senate Appropriations Committee.
SB 559 (Stern) of the current legislative session, requires electrical corporations to provide specified notifications of deenergization events related to mitigating wildfire ignition risks, and requires specified reporting to, and oversight by, the CPUC. The bill is pending in the Senate Appropriations Committee.
SB 797 (Choi) of the current legislative session, requires the CPUC to establish a working group and develop a report related to wildfire mitigation. The bill is pending in this committee.
SB 1003 (Dodd) of 2024, would have modified timelines relevant to the wildfire mitigation plans by electrical corporations and requires the electrical corporations to take into account both the time required to implement an action and the amount of risk reduced for the costs and risk remaining. The bill was held on the Assembly Floor.
SB 884 (McGuire, Chapter 819, Statutes of 2022) required the CPUC to establish an expedited electric utility distribution infrastructure undergrounding program for large electrical corporations.
SB 533 (Stern, Chapter 244, Statutes of 2021) required electrical corporations to identify circuits that have frequently been deenergized to mitigate the risk of wildfire and the measures taken to reduce the need for future deenergization of those circuits, as specified.
AB 1054 (Holden, Chapter 79, Statutes of 2019) included numerous provisions related to addressing wildfires caused by electric utility infrastructure, including: bolstering safety oversight and processes, recasting recovery of costs from damages to third-parties, including the authorization for an electrical corporation and ratepayer jointly funded Wildfire Fund to address future damages.
SB 167 (Dodd, Chapter 403, Statutes of 2019) required electrical corporations to include impacts on customers enrolled in specified programs as part of the protocols for deenergizing portions of their distribution system within their WMP.
SB 901 (Dodd, Chapter 626, Statutes of 2018) addressed numerous issues concerning wildfire prevention, response and recovery, including funding for mutual aid, fuel reduction and forestry policies, WMP by electric utilities, and cost recovery by electric corporations of wildfire-related damages.
SB 1028 (Hill, Chapter 598, Statutes of 2016) required electric CPUC-regulated utilities to file annual WMPs and requires the CPUC to review and comment on those plans.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
None received
OPPOSITION, unless amended:
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison
ARGUMENTS IN SUPPORT: According to the author:
SB 292 plays a crucial role by providing detailed historical and natural disaster-related data on power outages, which is essential for developing robust resilience planning strategies. As a state, it is imperative that we gain a deep understanding of the complexities surrounding demographic and socioeconomic factors to effectively enhance our planning efforts. This comprehensive data will serve as a guiding light, allowing us to identify and prioritize investments in the most vulnerable areas and implement tailored local solutions that can offer critical support during disasters, outages, and crises.
…SB 292 aims to bridge the critical divide between utility reporting and community resilience planning. By doing so, it enables us to utilize outage data not merely as numbers, but as a meaningful lens through which we can better understand and address the far-reaching impacts of outage durations on our most vulnerable populations.
ARGUMENTS IN OPPOSITION: PG&E, SCE, and SDG&E state:
The bill’s expanded reporting requirements would be created outside established processes at the Commission that allow for deliberate development and adoption of standards based on feedback from interested stakeholders. Implementing SB 292’s provisions would require the Commission to reopen these proceedings and would necessitate collection and consideration of substantial stakeholder feedback, creating additional administrative burdens for utilities, stakeholders, and the Commission, and new investments in data systems by utilities, inevitably increasing customer costs.
-- END --
Bill Author
Bill Co-Author(s):