SB 453: Microgrid incentive program.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2025-07-17
Current Status:
In Progress
(2026-08-28: Joint Rule 61(b)(16) suspended. (Ayes 57. Noes 1. Page 6819.))
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law requires the Public Utilities Commission (PUC), in consultation with the State Energy Resources Conservation and Development Commission and the Independent System Operator, to take specified actions by December 1, 2020, to facilitate the commercialization of microgrids for distribution customers of large electrical corporations, including, among other actions, by, without shifting costs between ratepayers, developing methods to reduce barriers for microgrid deployment. Under existing law, the PUC requires certain large electrical corporations to jointly develop a Microgrid Incentive Program to fund clean energy microgrids to support the critical needs of vulnerable populations impacted by a grid outage.
This bill would require the PUC to require each electrical corporation to provide to the commission, on or before January 15, 2026, the status of any awarded or unallocated funds collected for the Microgrid Incentive Program. The bill would require the commission, after reviewing that information, if it determines additional actions actions, using funds collected on or before January 1, 2026, are needed, to consider the use of a third-party administrator and to ensure that unallocated funds are allocated to areas that have experienced 2 or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations, and prioritizing customers that operate critical community infrastructure that supports resiliency during a deenergization event. The bill would require, if there are remaining unallocated funds on January 1, 2027, that those funds to be returned to ratepayers.
(3)UnderUnder existing law, a violation of any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because a violation of a PUC action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(2)Existing law requires the PUC, Public Utilities Commission (PUC), in consultation with the State Energy Resources Conservation and Development Commission and the Independent System Operator, to take specified actions by December 1, 2020, to facilitate the commercialization of microgrids for distribution customers of large electrical corporations, including, among other actions, by, without shifting costs between ratepayers, developing methods to reduce barriers for microgrid deployment. Under existing law, the PUC requires certain large electrical corporations to jointly develop a Microgrid Incentive Program to fund clean energy microgrids to support the critical needs of vulnerable populations impacted by a grid outage.
This bill would require the PUC to require each electrical corporation to provide to the commission, on or before January 15, 2026, the status of any awarded or unallocated funds collected for the Microgrid Incentive Program. The bill would require the commission, after reviewing that information and information, if it determines additional actions are needed, to consider the use of a third-party administrator and to ensure that unallocated funds are allocated to areas that have experienced 2 or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations, and prioritizing customers that operate critical community infrastructure that supports resiliency during a deenergization event.
(3)Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain provisions of this bill would be a part of the act and a violation of a PUC action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)Existing law requires the Public Utilities Commission (PUC), until January 1, 2026, to require the administration of the self-generation incentive program to increase the deployment of distributed generation and energy storage systems to facilitate the integration of those resources into the electrical grid, improve efficiency and reliability of the distribution and transmission system, and reduce emissions of greenhouse gases, peak demand, and ratepayer costs, as specified. Existing law requires the PUC, on January 1, 2026, to provide repayment of all unallocated funds collected for purposes of the program to reduce ratepayer costs.
This bill would extend the operation of the self-generation incentive program until January 1, 2028, and would require the PUC, on and after January 1, 2026, to allocate all unallocated funds for the program to areas that have experienced 2 or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations, and prioritizing customers that operate critical community infrastructure that support resiliency during a deenergization event, as specified. The bill would require the PUC, on January 1, 2028, to provide repayment of all unallocated funds collected for purposes of the program to reduce ratepayer costs.
Existing(2)Existing law requires the PUC, in consultation with the State Energy Resources Conservation and Development Commission and the Independent System Operator, to take specified actions by December 1, 2020, to facilitate the commercialization of microgrids for distribution customers of large electrical corporations, including, among other actions, by, without shifting costs between ratepayers, developing methods to reduce barriers for microgrid deployment. Under existing law, the PUC requires certain large electrical corporations to jointly develop a Microgrid Incentive Program to fund clean energy microgrids to support the critical needs of vulnerable populations impacted by a grid outage.
This bill would require, on and after January 1, 2026, any unallocated funds collected for purposes of the Microgrid Incentive Program to be allocated require the PUC to require each electrical corporation to provide to the commission, on or before January 15, 2026, the status of any awarded or unallocated funds for the Microgrid Incentive Program. The bill would require the commission, after reviewing that information and if it determines additional actions are needed, to consider the use of a third-party administrator and to ensure that unallocated funds are allocated to areas that have experienced 2 or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations, and prioritizing customers that operate critical community infrastructure that supports resiliency during a deenergization event.
Under(3)Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission PUC is a crime.
Because certain provisions of this bill would be a part of the act and a violation of a commission PUC action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law requires the Public Utilities Commission (PUC), until January 1, 2026, to require the administration of the self-generation incentive program to increase the deployment of distributed generation and energy storage systems to facilitate the integration of those resources into the electrical grid, improve efficiency and reliability of the distribution and transmission system, and reduce emissions of greenhouse gases, peak demand, and ratepayer costs, as specified. Existing law requires the PUC, on January 1, 2026, to provide repayment of all unallocated funds collected for purposes of the program to reduce ratepayer costs.
This bill would extend the operation of the self-generation incentive program until January 1, 2028, and would require the PUC, on and after January 1, 2026, to allocate all unallocated funds for the program to areas that have experienced 2 or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations, and prioritizing customers that operate critical community infrastructure that support resiliency during a deenergization event, as specified. The bill would require the PUC, on January 1, 2028, to provide repayment of all unallocated funds collected for purposes of the program to reduce ratepayer costs.
Existing law requires the PUC, in consultation with the State Energy Resources Conservation and Development Commission and the Independent System Operator, to take specified actions by December 1, 2020, to facilitate the commercialization of microgrids for distribution customers of large electrical corporations, including, among other actions, by, without shifting costs between ratepayers, developing methods to reduce barriers for microgrid deployment. Under existing law, the PUC requires certain large electrical corporations to jointly develop a Microgrid Incentive Program to fund clean energy microgrids to support the critical needs of vulnerable populations impacted by a grid outage.
This bill would require, on and after January 1, 2026, any unallocated funds collected for purposes of the Microgrid Incentive Program to be allocated to areas that have experienced 2 or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations, and prioritizing customers that operate critical community infrastructure that supports resiliency during a deenergization event.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because certain provisions of this bill would be a part of the act and a violation of a commission action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including gas corporations. An existing commission order requires the commission to investigate the causes and impacts of the winter 20222023 natural gas price spikes and the potential for recurrence, the impact of the price spikes on natural gas and electricity prices and customer bills, the potential threats to gas and electrical reliability and price volatility in summer 2023 and beyond, potential mitigations, and utility communications to customers to determine whether they were sufficient or require modifications.This bill would require the commission, on or before February 1, 2026, to submit a report to the relevant legislative policy committees of the Legislature on the status, outcomes, and recommendations of the commission order described above and the status and any findings of any related investigations by the Federal Energy Regulatory Commission.Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including gas corporations. An existing commission order requires the commission to investigate the causes and impacts of the winter 20222023 natural gas price spikes and the potential for recurrence, the impact of the price spikes on natural gas and electricity prices and customer bills, the potential threats to gas and electrical reliability and price volatility in summer 2023 and beyond, potential mitigations, and utility communications to customers to determine whether they were sufficient or require modifications.
This bill would require the commission, on or before February 1, 2026, to submit a report to the relevant legislative policy committees of the Legislature on the status, outcomes, and recommendations of the commission order described above and the status and any findings of any related investigations by the Federal Energy Regulatory Commission.
(a)(1)The commission shall require each electrical corporation to provide to the commission, on or before January 15, 2026, the status of any awarded or unallocated funds collected for purposes of the Microgrid Incentive Program established pursuant to commission Decision 21-01-018 (January 21, 2021), Decision Adopting Rates, Tariffs, and Rules Facilitating the Commercialization of Microgrids Pursuant to Senate Bill 1339 and Resiliency Strategies, and Decision 23-04-034 (April 14, 2023), Decision Adopting Implementation Rules for the Microgrid Incentive Program.
(2)The commission shall review the status of the unallocated funds of each electrical corporation provided pursuant to paragraph (1) and determine whether additional actions actions, using the funds collected on or before January 1, 2026, are needed to advance the Microgrid Incentive Program.
(3)If the commission determines, after conducting a the review required pursuant to paragraph (2), that additional actions are needed to advance the Microgrid Incentive Program for the electrical corporation, the commission shall do both of the following:
(A)Consider the use of a third-party administrator to administer the Microgrid Incentive Program for the electrical corporation.
(B)(i)In addition to the requirements of the Microgrid Incentive Program, ensure the remaining unallocated funds are allocated to areas that have experienced two or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations who rely on electric medical devices and refrigerated medication, and prioritizing customers that operate critical community infrastructure that support resiliency during a deenergization event.
(ii)If there are remaining unallocated funds on January 1, 2027, those funds shall be returned to ratepayers as bill credits.
(b)This section does not authorize the commission to impose an additional charge on ratepayers or to otherwise require the collection of additional funds from ratepayers.
(b)(c)For purposes of this section, all of the following definitions apply:
(1)Access and functional needs population has the same meaning as defined in Section 8593.3 of the Government Code.
(2)Critical community infrastructure has the same meaning as defined in Section 90100 of the Public Resources Code.
(3)Deenergization event has the same meaning as defined in Section 8385.
(4)Vulnerable communities has the same meaning as defined in Section 71340 of the Public Resources Code.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)The commission shall require each electrical corporation to provide to the commission, on or before January 15, 2026, the status of any awarded or unallocated funds collected for purposes of the Microgrid Incentive Program established pursuant to commission Decision 21-01-018 (January 21, 2021), Decision Adopting Rates, Tariffs, and Rules Facilitating the Commercialization of Microgrids Pursuant to Senate Bill 1339 and Resiliency Strategies, and Decision 23-04-034 (April 14, 2023), Decision Adopting Implementation Rules for the Microgrid Incentive Program.
(2)The commission shall review the status of the unallocated funds of each electrical corporation provided pursuant to paragraph (1) and determine whether additional actions are needed to advance the Microgrid Incentive Program.
(3)If the commission determines, after conducting a review required pursuant to paragraph (2), that additional actions are needed to advance the Microgrid Incentive Program for the electrical corporation, the commission shall do both of the following:
(A)Consider the use of a third-party administrator to administer the Microgrid Incentive Program for the electrical corporation.
(B)In addition to the requirements of the Microgrid Incentive Program, ensure the remaining unallocated funds are allocated to areas that have experienced two or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations who rely on electric medical devices and refrigerated medication, and prioritizing customers that operate critical community infrastructure that support resiliency during a deenergization event.
(b)For purposes of this section, all of the following definitions apply:
(1)Access and functional needs population has the same meaning as defined in Section 8593.3 of the Government Code.
(2)Critical community infrastructure has the same meaning as defined in Section 90100 of the Public Resources Code.
(3)Deenergization event has the same meaning as defined in Section 8385.
(4)Vulnerable communities has the same meaning as defined in Section 71340 of the Public Resources Code.
SEC. 3.SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)It is the intent of the Legislature that the self-generation incentive program increase deployment of distributed generation and energy storage systems to facilitate the integration of those resources into the electrical grid, improve efficiency and reliability of the distribution and transmission system, and reduce emissions of greenhouse gases, peak demand, and ratepayer costs. It is the further intent of the Legislature that the commission, in future proceedings, provide for an equitable distribution of the costs and benefits of the program.
(2)The commission, in consultation with the Energy Commission, may authorize the annual collection of not more than double the amount authorized for the self-generation incentive program in the 2008 calendar year, through December 31, 2024. The commission shall require the administration of the program for distributed energy resources originally established pursuant to Chapter 329 of the Statutes of 2000 until January 1, 2028. On and after January 1, 2026, the commission shall allocate all unallocated funds collected pursuant to this section to areas that have experienced two or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations who rely on electric medical devices and refrigerated medications, and prioritizing customers that operate critical community infrastructure that supports resiliency during a deenergization event. On January 1, 2028, the commission shall provide repayment of all unallocated funds collected pursuant to this section to reduce ratepayer costs.
(b)(1)Eligibility for incentives under the self-generation incentive program that are funded through the annual collection authorized pursuant to paragraph (2) of subdivision (a) shall be limited to distributed energy resources that the commission, in consultation with the State Air Resources Board, determines will achieve reductions in emissions of greenhouse gases pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code).
(2)On or before July 1, 2015, the commission shall update the factor for avoided greenhouse gas emissions based on both the most recent data available to the State Air Resources Board for greenhouse gas emissions from electricity sales in the self-generation incentive program administrators service areas and current estimates of greenhouse gas emissions over the useful life of the distributed energy resource, including consideration of the effects of the California Renewables Portfolio Standard.
(3)The commission shall adopt requirements for energy storage systems to ensure that eligible energy storage systems reduce the emissions of greenhouse gases.
(c)Eligibility for the funding of any combustion-operated distributed generation projects using fossil fuel is subject to all of the following conditions:
(1)An oxides of nitrogen (NOx) emissions rate standard of 0.07 pounds per megawatthour and a minimum efficiency of 60 percent, or any other NOx emissions rate and minimum efficiency standard adopted by the State Air Resources Board. A minimum efficiency of 60 percent shall be measured as useful energy output divided by fuel input. The efficiency determination shall be based on 100-percent load.
(2)Combined heat and power units that meet the 60-percent efficiency standard may take a credit to meet the applicable NOx emissions standard of 0.07 pounds per megawatthour. Credit shall be at the rate of one megawatthour for each 3,400,000 British thermal units (Btus) of heat recovered.
(3)The customer receiving incentives shall adequately maintain and service the combined heat and power units so that during operation the system continues to meet or exceed the efficiency and emissions standards established pursuant to paragraphs (1) and (2).
(4)Notwithstanding paragraph (1), a project that does not meet the applicable NOx emissions standard is eligible if it meets both of the following requirements:
(A)The project operates solely on waste gas. The commission shall require a customer that applies for an incentive pursuant to this paragraph to provide an affidavit or other form of proof that specifies that the project shall be operated solely on waste gas. Incentives awarded pursuant to this paragraph shall be subject to refund and shall be refunded by the recipient to the extent the project does not operate on waste gas. As used in this paragraph, waste gas means natural gas that is generated as a byproduct of petroleum production operations and is not eligible for delivery to the utility pipeline system.
(B)The air quality management district or air pollution control district, in issuing a permit to operate the project, determines that operation of the project will produce an onsite net air emissions benefit compared to permitted onsite emissions if the project does not operate. The commission shall require the customer to secure the permit before receiving incentives.
(d)In determining the eligibility for the self-generation incentive program, minimum system efficiency shall be determined either by calculating electrical and process heat efficiency as set forth in Section 216.6, or by calculating overall electrical efficiency.
(e)Eligibility for incentives under the self-generation incentive program shall be limited to distributed energy resource technologies that the commission determines meet all of the following requirements:
(1)The distributed energy resource technology shifts onsite energy use to off-peak time periods or reduces demand from the grid by offsetting some or all of the customers onsite energy load, including, but not limited to, net peak electric load.
(2)The distributed energy resource technology is commercially available.
(3)The distributed energy resource technology safely uses the existing transmission and distribution system.
(4)The distributed energy resource technology improves air quality by reducing criteria air pollutants.
(f)Recipients of the self-generation incentive program funds shall provide relevant data to the commission and the State Air Resources Board, upon request, and shall be subject to onsite inspection to verify equipment operation and performance, including capacity, thermal output, and usage to verify criteria air pollutant and greenhouse gas emissions performance.
(g)In administering the self-generation incentive program, the commission shall determine a capacity factor for each distributed generation system energy resource technology in the program.
(h)(1)In administering the self-generation incentive program, the commission may adjust the amount of incentives and evaluate other public policy interests, including, but not limited to, ratepayers, energy efficiency, peak load reduction, load management, and environmental interests.
(2)The commission shall consider the relative amount and the cost of greenhouse gas emissions reductions, peak demand reductions, system reliability benefits, and other measurable factors when allocating program funds between eligible technologies.
(i)The commission shall ensure that distributed generation resources are made available in the self-generation incentive program for all ratepayers.
(j)In administering the self-generation incentive program, the commission shall provide an additional incentive of 20 percent from existing program funds for the installation of eligible distributed generation resources manufactured in California.
(k)The costs of the self-generation incentive program shall not be recovered from customers participating in the California Alternate Rates for Energy (CARE) program.
(l)The commission shall evaluate the overall success and impact of the self-generation incentive program based on the following performance measures:
(1)The amount of reductions of emissions of greenhouse gases.
(2)The amount of reductions of emissions of criteria air pollutants measured in terms of avoided emissions and reductions of criteria air pollutants represented by emissions credits secured for project approval.
(3)The amount of energy reductions measured in energy value.
(4)The amount of reductions of customer peak demand.
(5)The ratio of the electricity generated by distributed energy resource generation projects receiving incentives from the self-generation incentive program to the electricity capable of being produced by those projects, commonly known as a capacity factor.
(6)The value to the electrical transmission and distribution system measured in avoided costs of transmission and distribution upgrades and replacement.
(7)The ability to improve onsite electricity reliability as compared to onsite electricity reliability before the self-generation incentive program technology was placed in service.
(m)On and after January 1, 2020, generation technologies using nonrenewable fuels shall not be eligible for incentives under the self-generation incentive program.
(n)For purposes of this section, all of the following definitions apply:
(1)Access and functional needs population has the same meaning as defined in Section 8593.3 of the Government Code.
(2)Critical community infrastructure has the same meaning as defined in Section 90100 of the Public Resources Code.
(3)Deenergization event has the same meaning as defined in Section 8385.
(4)Vulnerable communities has the same meaning as defined in Section 71340 of the Public Resources Code.
SEC. 2.Section 8371.6 is added to the Public Utilities Code, to read:8371.6.(a)On and after January 1, 2026, any (1)The commission shall require each electrical corporation to provide to the commission, on or before January 15, 2026, the status of any awarded or unallocated funds collected for purposes of the Microgrid Incentive Program established pursuant to commission Decision 21-01-018 (January 21, 2021), Decision Adopting Rates, Tariffs, and Rules Facilitating the Commercialization of Microgrids Pursuant to Senate Bill 1339 and Resiliency Strategies, and Decision 23-04-034 (April 14, 2023), Decision Adopting Implementation Rules for the Microgrid Incentive Program, shall be allocated Program.
(2)The commission shall review the status of the unallocated funds of each electrical corporation provided pursuant to paragraph (1) and determine whether additional actions are needed to advance the Microgrid Incentive Program.
(3)If the commission determines, after conducting a review required pursuant to paragraph (2), that additional actions are needed to advance the Microgrid Incentive Program for the electrical corporation, the commission shall do both of the following:
(A)Consider the use of a third-party administrator to administer the Microgrid Incentive Program for the electrical corporation.
(B)In addition to the requirements of the Microgrid Incentive Program, ensure the remaining unallocated funds are allocated to areas that have experienced two or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations who rely on electric medical devices and refrigerated medication, and prioritizing customers that operate critical community infrastructure that support resiliency during a deenergization event.
(b)For purposes of this section, all of the following definitions apply:
(1)Access and functional needs population has the same meaning as defined in Section 8593.3 of the Government Code.
(2)Critical community infrastructure has the same meaning as defined in Section 90100 of the Public Resources Code.
(3)Deenergization event has the same meaning as defined in Section 8385.
(4)Vulnerable communities has the same meaning as defined in Section 71340 of the Public Resources Code.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)It is the intent of the Legislature that the self-generation incentive program increase deployment of distributed generation and energy storage systems to facilitate the integration of those resources into the electrical grid, improve efficiency and reliability of the distribution and transmission system, and reduce emissions of greenhouse gases, peak demand, and ratepayer costs. It is the further intent of the Legislature that the commission, in future proceedings, provide for an equitable distribution of the costs and benefits of the program.
(2)The commission, in consultation with the Energy Commission, may authorize the annual collection of not more than double the amount authorized for the self-generation incentive program in the 2008 calendar year, through December 31, 2024. The commission shall require the administration of the program for distributed energy resources originally established pursuant to Chapter 329 of the Statutes of 2000 until January 1, 2026. 2028. On and after January 1, 2026, the commission shall allocate all unallocated funds collected pursuant to this section to areas that have experienced two or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations who rely on electric medical devices and refrigerated medications, and prioritizing customers that operate critical community infrastructure that supports resiliency during a deenergization event. On January 1, 2026, 2028, the commission shall provide repayment of all unallocated funds collected pursuant to this section to reduce ratepayer costs.
(b)(1)Eligibility for incentives under the self-generation incentive program that are funded through the annual collection authorized pursuant to paragraph (2) of subdivision (a) shall be limited to distributed energy resources that the commission, in consultation with the State Air Resources Board, determines will achieve reductions in emissions of greenhouse gases pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code).
(2)On or before July 1, 2015, the commission shall update the factor for avoided greenhouse gas emissions based on both the most recent data available to the State Air Resources Board for greenhouse gas emissions from electricity sales in the self-generation incentive program administrators service areas and current estimates of greenhouse gas emissions over the useful life of the distributed energy resource, including consideration of the effects of the California Renewables Portfolio Standard.
(3)The commission shall adopt requirements for energy storage systems to ensure that eligible energy storage systems reduce the emissions of greenhouse gases.
(c)Eligibility for the funding of any combustion-operated distributed generation projects using fossil fuel is subject to all of the following conditions:
(1)An oxides of nitrogen (NOx) emissions rate standard of 0.07 pounds per megawatthour and a minimum efficiency of 60 percent, or any other NOx emissions rate and minimum efficiency standard adopted by the State Air Resources Board. A minimum efficiency of 60 percent shall be measured as useful energy output divided by fuel input. The efficiency determination shall be based on 100-percent load.
(2)Combined heat and power units that meet the 60-percent efficiency standard may take a credit to meet the applicable NOx emissions standard of 0.07 pounds per megawatthour. Credit shall be at the rate of one megawatthour for each 3,400,000 British thermal units (Btus) of heat recovered.
(3)The customer receiving incentives shall adequately maintain and service the combined heat and power units so that during operation the system continues to meet or exceed the efficiency and emissions standards established pursuant to paragraphs (1) and (2).
(4)Notwithstanding paragraph (1), a project that does not meet the applicable NOx emissions standard is eligible if it meets both of the following requirements:
(A)The project operates solely on waste gas. The commission shall require a customer that applies for an incentive pursuant to this paragraph to provide an affidavit or other form of proof that specifies that the project shall be operated solely on waste gas. Incentives awarded pursuant to this paragraph shall be subject to refund and shall be refunded by the recipient to the extent the project does not operate on waste gas. As used in this paragraph, waste gas means natural gas that is generated as a byproduct of petroleum production operations and is not eligible for delivery to the utility pipeline system.
(B)The air quality management district or air pollution control district, in issuing a permit to operate the project, determines that operation of the project will produce an onsite net air emissions benefit compared to permitted onsite emissions if the project does not operate. The commission shall require the customer to secure the permit before receiving incentives.
(d)In determining the eligibility for the self-generation incentive program, minimum system efficiency shall be determined either by calculating electrical and process heat efficiency as set forth in Section 216.6, or by calculating overall electrical efficiency.
(e)Eligibility for incentives under the self-generation incentive program shall be limited to distributed energy resource technologies that the commission determines meet all of the following requirements:
(1)The distributed energy resource technology shifts onsite energy use to off-peak time periods or reduces demand from the grid by offsetting some or all of the customers onsite energy load, including, but not limited to, net peak electric load.
(2)The distributed energy resource technology is commercially available.
(3)The distributed energy resource technology safely uses the existing transmission and distribution system.
(4)The distributed energy resource technology improves air quality by reducing criteria air pollutants.
(f)Recipients of the self-generation incentive program funds shall provide relevant data to the commission and the State Air Resources Board, upon request, and shall be subject to onsite inspection to verify equipment operation and performance, including capacity, thermal output, and usage to verify criteria air pollutant and greenhouse gas emissions performance.
(g)In administering the self-generation incentive program, the commission shall determine a capacity factor for each distributed generation system energy resource technology in the program.
(h)(1)In administering the self-generation incentive program, the commission may adjust the amount of incentives and evaluate other public policy interests, including, but not limited to, ratepayers, energy efficiency, peak load reduction, load management, and environmental interests.
(2)The commission shall consider the relative amount and the cost of greenhouse gas emissions reductions, peak demand reductions, system reliability benefits, and other measurable factors when allocating program funds between eligible technologies.
(i)The commission shall ensure that distributed generation resources are made available in the self-generation incentive program for all ratepayers.
(j)In administering the self-generation incentive program, the commission shall provide an additional incentive of 20 percent from existing program funds for the installation of eligible distributed generation resources manufactured in California.
(k)The costs of the self-generation incentive program shall not be recovered from customers participating in the California Alternate Rates for Energy (CARE) program.
(l)The commission shall evaluate the overall success and impact of the self-generation incentive program based on the following performance measures:
(1)The amount of reductions of emissions of greenhouse gases.
(2)The amount of reductions of emissions of criteria air pollutants measured in terms of avoided emissions and reductions of criteria air pollutants represented by emissions credits secured for project approval.
(3)The amount of energy reductions measured in energy value.
(4)The amount of reductions of customer peak demand.
(5)The ratio of the electricity generated by distributed energy resource generation projects receiving incentives from the self-generation incentive program to the electricity capable of being produced by those projects, commonly known as a capacity factor.
(6)The value to the electrical transmission and distribution system measured in avoided costs of transmission and distribution upgrades and replacement.
(7)The ability to improve onsite electricity reliability as compared to onsite electricity reliability before the self-generation incentive program technology was placed in service.
(m)On and after January 1, 2020, generation technologies using nonrenewable fuels shall not be eligible for incentives under the self-generation incentive program.
(n)For purposes of this section, all of the following definitions apply:
(1)Access and functional needs population has the same meaning as defined in Section 8593.3 of the Government Code.
(2)Critical community infrastructure has the same meaning as defined in Section 90100 of the Public Resources Code.
(3)Deenergization event has the same meaning as defined in Section 8385.
(4)Vulnerable communities has the same meaning as defined in Section 71340 of the Public Resources Code.
SEC. 2.Section 8371.6 is added to the Public Utilities Code, to read:8371.6.(a)On and after January 1, 2026, any unallocated funds collected for purposes of the Microgrid Incentive Program established pursuant to commission Decision 21-01-018 (January 21, 2021), Decision Adopting Rates, Tariffs, and Rules Facilitating the Commercialization of Microgrids Pursuant to Senate Bill 1339 and Resiliency Strategies, and Decision 23-04-034 (April 14, 2023), Decision Adopting Implementation Rules for the Microgrid Incentive Program, shall be allocated to areas that have experienced two or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations who rely on electric medical devices and refrigerated medication, and prioritizing customers that operate critical community infrastructure that support resiliency during a deenergization event.
(b)For purposes of this section, all of the following definitions apply:
(1)Access and functional needs population has the same meaning as defined in Section 8593.3 of the Government Code.
(2)Critical community infrastructure has the same meaning as defined in Section 90100 of the Public Resources Code.
(3)Deenergization event has the same meaning as defined in Section 8385.
(4)Vulnerable communities has the same meaning as defined in Section 71340 of the Public Resources Code.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Section 913.18 is added to the Public Utilities Code, to read:913.18.(a)Notwithstanding Section 10231.5 of the Government Code, on or before February 1, 2026, the commission shall submit a report to the relevant policy committees of the Legislature on the status, outcomes, and recommendations of the commissions Order Instituting Investigation on the Commissions Own Motion into Natural Gas Prices During Winter 20222023 and Resulting Impacts to Energy Markets.(b)The commission shall include, in the report, the status and any findings of any related investigations by the Federal Energy Regulatory Commission.(a)Notwithstanding Section 10231.5 of the Government Code, on or before February 1, 2026, the commission shall submit a report to the relevant policy committees of the Legislature on the status, outcomes, and recommendations of the commissions Order Instituting Investigation on the Commissions Own Motion into Natural Gas Prices During Winter 20222023 and Resulting Impacts to Energy Markets.
(b)The commission shall include, in the report, the status and any findings of any related investigations by the Federal Energy Regulatory Commission.
|
Date
|
Status
|
|---|---|
| Aug 28, 2026 | Joint Rule 61(b)(16) suspended. (Ayes 57. Noes 1. Page 6819.) |
| Aug 28, 2026 | Joint Rule 61(b)(16) suspended. |
| Aug 19, 2026 | Ordered to third reading. |
| Aug 19, 2026 | From inactive file. |
| Aug 18, 2026 | Notice of intention to remove from inactive file given by Assembly Member Aguiar-Curry. |
| Jul 2, 2026 | Ordered to inactive file on request of Assembly Member Garcia. |
| Jun 3, 2026 | Ordered to third reading. |
| Jun 3, 2026 | From inactive file. |
| Jun 2, 2026 | Ordered to third reading. |
| Jun 2, 2026 | From inactive file. |
| Jun 1, 2026 | Notice of intention to remove from inactive file given by Assembly Member Aguiar-Curry. |
| Sep 9, 2025 | Ordered to inactive file on request of Assembly Member Aguiar-Curry. |
| Aug 21, 2025 | Read second time. Ordered to third reading. |
| Aug 20, 2025 | From committee: Do pass. (Ayes 15. Noes 0.) (August 20). |
| Jul 17, 2025 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 17, 2025 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 18. Noes 0.) (July 16). |
| Jul 17, 2025 | Assembly Rule 63 suspended. (Ayes 49. Noes 15. Page 2578.) |
| Jul 8, 2025 | July 9 set for first hearing canceled at the request of author. |
| Jun 16, 2025 | Referred to Com. on U. & E. |
| Jun 5, 2025 | In Assembly. Read first time. Held at Desk. |
| Jun 4, 2025 | Read third time. Passed. (Ayes 39. Noes 0. Page 1503.) Ordered to the Assembly. |
| May 27, 2025 | Read second time. Ordered to third reading. |
| May 23, 2025 | From committee: Do pass as amended. (Ayes 6. Noes 0. Page 1201.) (May 23). |
| May 23, 2025 | Read second time and amended. Ordered to second reading. |
| May 20, 2025 | Set for hearing May 23. |
| May 19, 2025 | May 19 hearing: Placed on APPR. suspense file. |
| May 9, 2025 | Set for hearing May 19. |
| May 6, 2025 | Read second time and amended. Re-referred to Com. on APPR. |
| May 5, 2025 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 16. Noes 0. Page 935.) (April 29). |
| Apr 11, 2025 | Set for hearing April 29. |
| Mar 26, 2025 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on E., U & C. |
| Mar 18, 2025 | March 24 set for first hearing canceled at the request of author. |
| Mar 17, 2025 | Set for hearing March 24. |
| Feb 26, 2025 | Referred to Com. on E., U & C. |
| Feb 20, 2025 | From printer. May be acted upon on or after March 22. |
| Feb 19, 2025 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 20, 2025 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jul 16, 2025 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Energy |
Passed |
|
| Jun 4, 2025 | Senate 3rd Reading SB453 Stern | Senate Floor |
Passed |
|
| May 23, 2025 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| May 19, 2025 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 29, 2025 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 350 Sacramento | ** Support | |
| California Association Of Recreation & Park Districts | ** Support | |
| City of Moorpark | ** Support | |
| City of Thousand Oaks | ** Support | |
| Coalition of Small and Disabled Veteran Businesses | ** Support | |
| County of Los Angeles Board of Supervisors | ** Support | |
| County of Ventura | ** Support | |
| Las Virgenes Municipal Water District | ** Support | |
| Other | ** Against | |
| pg&e | ** Against |
SENATE THIRD READING
STR Bill Id:SB 453
Author:(Stern)
As Amended Ver:July 17, 2025
Majority vote
SUMMARY
Requires the California Public Utilities Commission (CPUC) to review the status of unallocated ratepayer funds for the microgrid incentive program (MIP), directs the CPUC to allocate available MIP funds to areas affected by deenergization events and to prioritize vulnerable communities, and requires return to ratepayers any MIP funds unallocated by January 1, 2027.
Major Provisions
- Requires the CPUC to review the status of unallocated funds collected by the state's largest electric investor-owned utilities (IOUs) and determine if additional actions are needed to advance the MIP.
- Requires the CPUC, if it determines additional actions are needed to advance the MIP, to consider the use of a third party to administer the MIP for each applicable IOU, and ensure the remaining funds are allocated to areas that have experienced two or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations that rely on electric medical devices and refrigerated medication, and prioritizing customers that operate critical community infrastructure that supports resiliency during a deenergization event.
- Requires that any remaining unallocated MIP funds on January 1, 2027, be returned to IOU ratepayers as bill credits and states that this bill does not authorize the CPUC to collect any additional funds from ratepayers for the MIP.
COMMENTS
Microgrids. Generally, a microgrid is an interconnected network of electrical loads and distributed generation resources interconnected to the larger electrical grid that can be "islanded" to operate independent of the electrical grid. A microgrid can be as simple as a diesel-fuel generator located near a building, such as a hospital, that can provide needed power during an electric power outage. Microgrids provide reliability and resiliency to better manage challenges, such as power outages due to wildfire and flooding.
In 2018, the Legislature passed SB 1339 (Stern), Chapter 566, Statutes of 2018, to require the CPUC, in consultation with the California Energy Commission and the California Independent System Operator, to take specified actions by December 1, 2020, to facilitate the commercialization of microgrids for distribution customers of large electrical corporations. Since September 2019, the CPUC has held an open and active proceeding to implement the bill (R. 19-09-009). In Decision 20-06-017, the CPUC ordered Pacific Gas & Electric (PG&E), San Diego Gas & Electric (SDG&E), and Southern California Edison (SCE) to jointly develop a statewide MIP to fund clean energy microgrids to support the critical needs of vulnerable communities impacted by grid outages, and test new technologies or regulatory approaches to inform future action on microgrids.
SB 1339 did not specify an amount or duration of ratepayer collections to fund the MIP or any other funding source. Absent statutory direction, the CPUC, by Decision 21-01-018, determined that funds to support the microgrid program of each IOU should be paid with ratepayer collections from all of that IOU’s customers. The CPUC approved a $200 million budget for the entire program, with $79.2 million for PG&E, $83.3 million for SCE, and $17.5 million for SDG&E.
As of July 2025, SDG&E reported it has awarded all of its MIP funding, PG&E reported it has awarded about half of its funding, and SCE reported that it only recently has awarded $17.5 million for one project and that it has more applications under review. This leaves about $43 million in funding available for PG&E and about $69 million for SCE, money this bill requires be returned to ratepayers if each IOU, respectively, is unable to allocate those funds to microgrid projects by January 1, 2027.
In addition to the MIP administered by the CPUC, the CEC reports that it has provided a total of $307 million for microgrid projects, including $208 million for nine microgrid projects over the past several years through the Long Duration Energy Storage (LDES) Program. The CEC also has provided $99.7 million to fund eight tribal microgrid projects over the past five years through the EPIC program, Energy Conservation Assistance Act (ECAA) Program, and LDES. These programs administered by CEC are also funded in part by IOU ratepayers.
Deenergization events. In recent years, California has experienced a number of catastrophic wildfires, including several ignited by electrical utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Risks for wildfires also increased with extended drought and bark beetle infestation that has increased tree mortalities, providing increased fuel and risk of wildfires. As a result, electrical corporations have increasingly utilized proactive power shutoffs, deenergization of electric distribution (and sometimes transmission) lines, as a tool to prevent igniting wildfires, particularly during high wind event days with dry ground conditions.
The CPUC has adopted protocols for IOUs to deenergize electric lines with a focus on who should receive notice and when, who should be responsible for notification, and how different customer groups should be identified. The protocols require electrical corporations to develop work groups that include representatives of the access and functional needs population. As the protocols have evolved over the years, there has been expanded requirements to develop needs assessments and plans to coordinate with identified access and functional needs population, identify critical infrastructure, and coordinate with public safety partners.
Collection of Ratepayer Funds. The CPUC administers many public purpose programs (PPPs) with funds the IOUs collect from ratepayers in their monthly bills. For some PPPs, a statute directs the amount and duration of ratepayer collections to fund a specific program, with a sunset provision, so that additional legislative authorization is required to extend collections beyond the original period. In other cases, such as with the MIP, a statute directs the CPUC to establish a program but does not specify an amount or duration of ratepayer collections to fund it. In a 2014 decision, a California appellate court held that the CPUC had authority to order IOU ratepayer collections to fund an energy research program, even after the Legislature failed to renew the statutory authorization to collect ratepayer funds for substantially the same program. (Southern California Edison Co. v. Natural Resources Defense Council (Cal. App. 2nd Cir. 2014)) The court upheld the CPUC's decision to order collection of ratepayer funds for an energy related program because no statute specifically prohibited it from doing so. This bill was amended by the Assembly Committee on Utilities and Energy to expressly provide a sunset date for return to ratepayers of unused funds and require new statutory authorization for collection of any additional funds for the MIP.
According to the Author
According to the author: "Extreme weather events and the threat of wildfires, and urban fires continue to result in the state's investor-owned utilities initiating Public Safety Power Shutoffs (PSPS) across large portions of their service area. While PSPS commonly last a day, they can also last for many days at a time, or be triggered on and off over a series of days until conditions improve to restore power. However, PSPS events that last just a few days or longer adversely impact services provided by critical facilities and by local governments. They also disproportionately impact vulnerable communities and access and functional needs persons who rely on electricity for medical devices and refrigerated medication to sustain their health. For vulnerable communities and access and functional needs customers PSPS events can actually increase risks to public health. The good news is we currently have rate-payer incentives through the [MIP] to provide funding to microgrid projects that enhance energy resiliency to mitigate the effects of PSPS events. The problem is implementing the program in some regions of the state have not been as aggressive as many would have hoped. If we can improve implementation then available incentives can get out the door faster for needed microgrid projects."
Arguments in Support
350 Sacramento, consistent with other supporters of the bill, states the following; "To stay in alignment with California's environmental justice goals, communities most impacted by climate change should have reliable, local electrical power during ever-more-frequent heatwaves, fires and floods that come with our warming planet. Microgrids ensure more resiliency during outages. SB 453 facilitates the protection of vulnerable communities while stabilizing the grid during extreme weather incidents due to climate change."
Arguments in Opposition
This bill has no registered opposition. However, PG&E raises "concerns," stating: "SB 453 (Stern) could unintentionally hinder program progress and increase costs for customers. The bill may require a third-party administrator—even when unnecessary—and mandates cost recovery through customer rates. Transferring administration could lead to duplicative expenses and inefficiencies, ultimately burdening customers. Additionally, shifting control to a third party raises concerns about oversight, transparency, and delays. The CPUC already has authority to oversee utility-led implementation, making SB 453's requirements redundant and potentially disruptive to the current framework."
FISCAL COMMENTS
According to the Assembly Appropriations Committee, this bill creates minor, absorbable costs to the CPUC.
VOTES
SENATE FLOOR: 39-0-1
YES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
ABS, ABST OR NV: Reyes
ASM UTILITIES AND ENERGY: 18-0-0
YES: Petrie-Norris, Patterson, Boerner, Calderon, Chen, Davies, Mark González, Harabedian, Hart, Irwin, Kalra, Papan, Rogers, Schiavo, Schultz, Ta, Wallis, Zbur
ASM APPROPRIATIONS: 15-0-0
YES: Wicks, Arambula, Calderon, Caloza, Dixon, Elhawary, Fong, Mark González, Hart, Pacheco, Pellerin, Jeff Gonzalez, Solache, Ta, Tangipa
UPDATED
VERSION: July 17, 2025
CONSULTANT: Jackie Kinney / U. & E. / (916) 319-2083 FN: 0001220
Date of Hearing: August 20, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 453
Author:(Stern) – As Amended Ver:July 17, 2025
Policy Committee: | Utilities and Energy | Vote: | 18 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill directs the California Public Utilities Commission (CPUC) to review the status of unallocated funds collected as part of the existing Microgrid Incentive Program (MIP).
Specifically, this bill:
- Requires the CPUC to review the status of unallocated funds collected by the state’s largest electric investor-owned utilities (IOUs) and determine if additional actions are needed to advance the MIP.
- If the CPUC determines additional actions are needed to advance the MIP, requires the CPUC to (a) consider the use of a third party to administer the MIP for each applicable IOU and (b), ensure the remaining unallocated funds are allocated to areas that have experienced two or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations that rely on electric medical devices and refrigerated medication, and prioritizing customers that operate critical community infrastructure that supports resiliency during a deenergization event.
- Explicitly requires that any remaining unallocated MIP funds on January 1, 2027, be returned to IOU ratepayers as bill credits and states this bill does not authorize the CPUC to impose an additional charge on ratepayers or to otherwise require the collection of additional funds from ratepayers.
FISCAL EFFECT:
Minor, absorbable costs to the CPUC.
While the CPUC does not anticipate costs to result from this bill, it expresses concern that the bill places “a one-time funding directive into permanent statute” and that, “Without a sunset or clear limiting language, the provision could be cited in the future to justify ratepayer funding for privately owned microgrids with primarily private benefits.”
COMMENTS:
- Purpose. The author intends this bill to lead to investments in microgrid projects, using unallocated funds for an existing program, which the author contends will better protect communities and vulnerable utility customers from harms resulting from deenergization events, such as public safety power shutoffs, used by the IOUs to mitigate wildfire risk.
- Background. Generally, a microgrid is an interconnected network of electrical loads and distributed generation resources interconnected to the larger electrical grid that can be “islanded” to operate independent of the electrical grid. In 2018, the Legislature passed SB 1339 (Stern), Chapter 566, Statutes of 2018, to require the CPUC, in consultation with the CEC and CAISO, to take specified actions by December 1, 2020, to facilitate the commercialization of microgrids for distribution customers of large electrical corporations.
The CPUC, subsequent to passage of SB 1339, approved a $200 million budget for the SB 1339 program, as follows: $79.2 million for Pacific Gas and Electric (PG&E), $83.3 million for Southern California Edison (SCE) and $17.5 million for San Diego Gas and Electric (SDG&E). According to the Assembly Utilities and Energy Committee analysis of this bill, SDG&E reported it has awarded all of its SB 1339 funding, PG&E reported it has awarded about half of its funding, and SCE has reported that it only recently has awarded $17.5 million for one project and that it has more applications under review.
This leaves about $43 million in funding available for PG&E and about $69 million for SCE, money this bill requires be returned to ratepayers if each IOU, respectively, is unable to make use of it by January 1, 2027.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: July 16, 2025
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
SBPCA Bill Id:SB 453
Author:(Stern) – As Amended Ver:May 23, 2025
SENATE VOTE: 39-0
SUBJECT: Microgrid incentive program
SUMMARY: This bill requires the California Public Utilities Commission (CPUC) to review the status of a ratepayer-funded microgrid incentive program (MIP) and directs the CPUC to ensure that any available funds are allocated to areas affected by deenergization events, with priority for vulnerable communities. Specifically, this bill:
- Requires the CPUC to require each electrical corporation to provide to the CPUC, on or before January 15, 2026, the status of any awarded or unallocated funds for the MIP.
- Requires the CPUC, after reviewing the information on the status of MIP awards, and if it determines additional actions are needed, to consider the use of a third-party administrator and to ensure that unallocated funds are allocated to areas that have experienced two or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations, and prioritizing customers that operate critical community infrastructure that supports resiliency during a deenergization event.
EXISTING LAW:
- Establishes and vests the CPUC with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires that all charges demanded or received by any public utility for any product, commodity or service be just and reasonable, and provides that every unjust or unreasonable charge is unlawful. (Public Utilities Code §451)
- Provides the CPUC with general, broad authority to regulate every public utility in the state. (Public Utilities Code §701)
- Requires the CPUC, in consultation with the California Energy Commission (CEC) and the California Independent System Operator, to take specified actions by December 1, 2020, to facilitate the commercialization of microgrids for distribution customers of large electrical corporations, including by, without shifting costs between ratepayers, developing methods to reduce barriers for microgrid deployment. (Public Utilities Code §8371)
- Prohibits microgrid projects that use diesel power generators from receiving Electric Program Investment Charge (EPIC) funding. (Public Resources Code §25711.8)
- Requires an electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. (Public Utilities Code §8386 (a))
- Requires electrical corporations, local electric publicly owned utilities, and electrical cooperatives to annually prepare wildfire mitigation plans (WMPs) that include protocols for deenergization and consideration of the impacts of deenergizing portions of the electrical distribution system on first responders, health and communication infrastructure, and customers eligible for medical baseline service. (Public Utilities Code §8386 (b))
- Requires the WMPs of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits. (Public Utilities Code §8386 (c)(8))
- Requires, for some public purpose programs (PPPs) funded by ratepayer charges, such as the Self-Generation Incentive Program (SGIP) as an example, that funds be returned to ratepayers if not used for their intended purpose by a specified date. (Public Utilities Code §379.6)
FISCAL EFFECT: According to the Senate Appropriations Committee, one-time costs, possibly in the hundreds of thousands of dollars (ratepayer funds), for the CPUC to implement the provisions of this bill.
CONSUMER IMPACTS: Potential return of ratepayer funds to electric customers.
BACKGROUND:
Microgrids – Generally, a microgrid is understood to be a self-contained, small (relative to the electrical grid), electricity system with the ability to manage critical customer resources, disconnect from the electric grid when the need arises, and provide the customer with different levels of critical support. A microgrid can be as simple as a diesel-fuel generator located near a building, such as a hospital, that is able to provide needed power during an electric power outage. Customers tend to seek reliability and resiliency services from microgrids. In particular, customers may value the desire for sufficient resources both at the utility scale, but also at the local level in order to better manage challenges, such as power outages due to wildfire and flooding. Although each microgrid can vary in component configuration, size, and applications, microgrids generally are made of a combination of distributed energy resources, storage, and demand response capabilities.
Microgrid Incentive Program – SB 1339 (Stern, Chapter 566, Statutes of 2018) required the CPUC and CEC to facilitate the commercialization of microgrids. Since September 2019, the CPUC has held an open and active proceeding to implement the bill (R. 19-09-009). In Decision 20-06-017, the CPUC ordered Pacific Gas & Electric (PG&E), San Diego Gas & Electric (SDG&E), and Southern California Edison (SCE) to jointly develop a statewide MIP to fund clean energy microgrids to support the critical needs of vulnerable communities impacted by grid outages and test new technologies or regulatory approaches to inform future action on microgrids.
SB 1339 did not specify an amount or duration of ratepayer collections to fund the MIP or any other funding source. Absent statutory direction, the CPUC, by decision, determined that funds to support the microgrid program of each IOU should be paid with ratepayer collections from all of that IOU’s customers.[1] The CPUC approved a $200 million budget for the entire program, with $79.2 million for PG&E, $83.3 million for SCE, and $17.5 million for SDG&E. SDG&E has reported it has awarded all of its funding. PG&E has reported it has awarded about half of its funding ($43 million) to nine projects. SCE has reported that it just recently awarded $17.5 million for one project and that it has more applications under review.
In addition, the CEC reports that it has provided a total of $307 million for microgrid projects, including $208 million for nine microgrid projects over the past several years through the Long Duration Energy Storage (LDES) Program. The CEC also has provided $99.7 million to fund eight tribal microgrid projects over the past five years through the EPIC program, Energy Conservation Assistance Act (ECAA) Program, and LDES. These programs administered by CEC are also funded in part by IOU ratepayers.
Deenergization events – In recent years, California has experienced a number of catastrophic wildfires, including several ignited by electrical utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Risks for wildfires also increased with extended drought and bark beetle infestation that has increased tree mortalities and, as a result, increased the fuel, and risk for wildfires. As a result, electrical corporations have increasingly utilized proactive power shutoffs, deenergization of electric distribution (and sometimes transmission) lines, as a tool to prevent igniting wildfires, particularly during high wind event days with dry ground conditions. Although the use of proactive power shutoffs were met with opposition and concerns about its use by affected communities, ultimately the CPUC acknowledged electrical corporations’ authority to deenergize lines in order to protect public safety, noting this authority in Public Utilities Code §451 and §399.2. The CPUC adopted protocols for deenergizing electric lines with a focus on who should receive notice and when, who should be responsible for notification, and how different customer groups should be identified. The protocols require electrical corporations to develop work groups that include representatives of the access and functional needs population. As the protocols have evolved over the years, there has been expanded requirements to develop needs assessments and plans to coordinate with identified access and functional needs population, identify critical infrastructure, and coordinate with public safety partners.
CPUC Authority to Order Collection of Ratepayer Funds – The CPUC administers many PPPs with funds the IOUs collect from ratepayers in their monthly bills. In some cases, such as SGIP, a statute directs the amount and duration of ratepayer collections to fund a specific program, with a sunset provision, so that additional legislative authorization is required to extend collections beyond the original period. In other cases, such as with the MIP, a statute directs the CPUC to establish a program but does not specify an amount or duration of ratepayer collections to fund it. In a 2014 decision, a California appellate court held that the CPUC had authority to order IOU ratepayer collections to fund an energy research program, even after the Legislature failed to renew the statutory authorization to collect ratepayer funds for substantially the same program.[2] The court upheld the CPUC’s decision to order collection of ratepayer funds for an energy related program because no statute specifically prohibited it from doing so.
COMMENTS:
- Author’s statement. According to the author: “Extreme weather events and the threat of wildfires, and urban fires continue to result in the state’s investor-owned utilities initiating Public Safety Power Shutoffs (PSPS) across large portions of their service area. While PSPS commonly last a day, they can also last for many days at a time, or be triggered on and off over a series of days until conditions improve to restore power. However, PSPS events that last just a few days or longer adversely impact services provided by critical facilities and by local governments. They also disproportionately impact vulnerable communities and access and functional needs persons who rely on electricity for medical devices and refrigerated medication to sustain their health. For vulnerable communities and access and functional needs customers PSPS events can actually increase risks to public health. The good news is we currently have rate-payer incentives through the Micogrid Incentive Program to provide funding to microgrid projects that enhance energy resiliency to mitigate the effects of PSPS events. The problem is implementing the program in some regions of the state have not been as aggressive as many would have hoped. If we can improve implementation then available incentives can get out the door faster for needed microgrid projects.”
- Changing Course Not Required. This bill requires the CPUC to review the status of unallocated funds in January 2026 and then determine if additional actions are needed to advance the program. IOUs raise concerns that changing the rules for the MIP at this stage could lead to delays as applicants need to design projects under new rules and IOUs need to adjust processes. Significantly, this bill does not require the CPUC to change course. Accelerated IOU progress in getting MIP funds out the door could weigh against the CPUC determining that “additional actions” such as more program changes are needed.
- Return Unused Funds to Ratepayers. This bill primarily addresses the author’s frustration with SCE being slow to get funds out the door to support microgrid projects in SCE’s service territory. SCE reports that, while slower than the other IOUs, it has been making progress. SCE further reports that multiple potential applicants who sought information about the program ultimately did not apply, likely because of ineligibility. This bill’s direction to focus unused funds on areas with deenergization events and vulnerable communities could help get funds out the door. On the other hand, collecting more funds than needed for a program adds to the affordability problem. Some statutes authorizing collections for other PPPs, such as SGIP, require funds be returned to ratepayers if not awarded for their intended purpose by a specified date. This can help lower customers’ monthly bills, even if only as a one-time bill credit. Thus, consistent with the Legislature’s focus on affordability, the committee recommends amending the bill to require that funds not awarded to a microgrid project by January 1, 2027, be returned to ratepayers.
- Avoid Additional Collections from Ratepayers. In light of the CPUC’s broad authority to order collection of ratepayer funds to support energy-related programs (discussed above), and the Legislature’s focus on affordability of utility service, it would seem prudent to have legislative limits on ratepayer collections for the MIP. Thus, the committee recommends amending this bill to specify that it applies only to funds already collected when the bill take effect and that it does not authorize any new collection of ratepayer funds for the MIP.
- Prior Legislation.
SB 1339 (Stern) required the CPUC and CEC to facilitate the commercialization of microgrids. Status: Chapter 566, Statutes of 2018
REGISTERED SUPPORT / OPPOSITION:
Support
350 Sacramento
California Association of Recreation & Park Districts
City of Thousand Oaks
Coalition of Small and Disabled Veteran Businesses
County of Los Angeles Board of Supervisors
Opposition
None on file.
Other
Pacific Gas and Electric Company and its Affiliated Entities
Analysis Prepared by: Jackie Kinney / U. & E. / (916) 319-2083
Decision 21-01-018 (January 14, 2021) at pp 63 to 64. ↑
Southern California Edison Co. v. Natural Resources Defense Council (Cal. App. 2nd Cir. 2014) (holding that, given the CPUC’s constitutional authority, combined with Section 701 of the Public Utilities Code, CPUC actions are within its broad authority as long as “cognate and germane to utility regulation” and not contrary to “a specific statutory directive that prohibits PUC’s action.” https://caselaw.findlaw.com/court/ca-court-of-appeal/1670239.html. ↑
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 453 |
THIRD READING
Bill No: SB 453
Author: Stern (D)
Amended: 5/23/25
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 16-0, 4/29/25
AYES: Becker, Ochoa Bogh, Allen, Archuleta, Arreguín, Ashby, Caballero, Dahle, Gonzalez, Hurtado, Limón, McNerney, Rubio, Stern, Strickland, Wahab
NO VOTE RECORDED: Grove
SENATE APPROPRIATIONS COMMITTEE: 6-0, 5/23/25
AYES: Caballero, Seyarto, Cabaldon, Grayson, Richardson, Wahab
NO VOTE RECORDED: Dahle
SUBJECT: Microgrid incentive program
SOURCE: Author
DIGEST:
This bill requires the California Public Utilities Commission (CPUC) to review the status of a ratepayer-funded microgrid incentive program and consider specified actions to direct any available funds to support vulnerable communities affected by deenergization events.
ANALYSIS:
Existing law:
- Establishes and vests the CPUC with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires that all charges demanded or received by any public utility for any product, commodity or service be just and reasonable, and that every unjust or unreasonable charge is unlawful. (Public Utilities Code §451)
- Provides the CPUC with general, broad authority to regulate every public utility in the state. (Public Utilities Code §701)
- Prohibits microgrid projects that use diesel power generators from receiving Electric Program Investment Charge (EPIC) funding. (Public Resources Code §25711.8)
- States the intent of the Legislature that the Self-Generation Incentive Program (SGIP) increase the deployment of distributed generation and energy storage systems to facilitate, among other things, the integration of those resources into the electrical grid. Authorizes the CPUC, in consultation with the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) and until December 31, 2024, to authorize the annual collection of not more than double the amount authorized for the SGIP in 2008. Requires the CPUC to administer the SGIP until January 1, 2026. Requires the CPUC, on January 1, 2026, to provide repayment of all unallocated funds collected to reduce ratepayer costs. (Public Utilities Code §379.6)
- Requires the CPUC, in consultation with the CEC and the California Independent System Operator (CAISO), to take specified actions by December 1, 2020, to facilitate the commercialization of microgrids for distribution customers of large electrical corporations, including, among other actions, by, without shifting costs between ratepayers, developing methods to reduce barriers for microgrid deployment. (Public Utilities Code §8371)
- Requires an electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. (Public Utilities Code §8386 (a))
- Requires electrical corporations, local electric publicly owned utilities (POUs), and electrical cooperatives to annually prepare wildfire mitigation plans (WMPs) that include, among other things, descriptions of protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety and protocols related to mitigating public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system. (Public Utilities Code §8386 (b))
- Requires the WMPs of electrical corporations to identify circuits that have frequently been deenergized pursuant to a deenergization event to mitigate the risk of wildfire and the measures taken, or planned to be taken, by the electrical corporation to reduce the need for, and impact of, future deenergization of those circuits. (Public Utilities Code §8386 (c)(8))
This bill:
- Requires the CPUC to require each electrical corporation to provide to the CPUC, on or before January 15, 2026, the status of any awarded or unallocated funds for the Microgrid Incentive Program (MIP).
- Requires the CPUC, after reviewing the information on the status of the awards for the MIP, and if it determines additional actions are needed, to consider the use of a third-party administrator and to ensure that unallocated funds are allocated to areas that have experienced two or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations, and prioritizing customers that operate critical community infrastructure that supports resiliency during a deenergization event.
Background
Microgrids. Generally, a microgrid is understood to be a self-contained, small (relative to the electrical grid), electricity system with the ability to manage critical customer resources, disconnect from the electric grid when the need arises, and provide the customer with different levels of critical support. A microgrid can be as simple as a diesel-fuel generator located near a building, such as a hospital, that is able to provide needed power during an electric power outage. Customers tend to seek reliability and resiliency services from microgrids. In particular, customers may value the desire for sufficient resources both at the utility scale, but also at the local level in order to better manage challenges, such as power outages due to wildfire, flooding, etc. Although each microgrid can vary in component configuration, size, and applications, generally, microgrids are made of a combination of distributed energy resources (DER), storage, and demand response capabilities.
Microgrid Incentive Program (MIP). SB 1339 (Stern, Chapter 566, Statutes of 2018) required the CPUC and CEC to facilitate the commercialization of microgrids. Since September 2019, the CPUC has held an open and active proceeding (R. 19-09-009) with various decisions, and tracks. Under Track 2 of the proceeding, via CPUC Decision (D. 20-06-017), the CPUC directed Pacific Gas & Electric (PG&E), San Diego Gas & Electric (SDG&E), and Southern California Edison (SCE) to jointly develop a statewide microgrid incentive program (Microgrid Incentive Program or MIP) with a $200 million budget, collected from ratepayers, to fund clean energy microgrids to support the critical needs of vulnerable communities impacted by grid outages and test new technologies or regulatory approaches to inform future action on microgrids.
The $200 million budget authorized for the MIP by CPUC decision (D.21-01-018) should be appropriated as follows: (1) $79,200,000 for PG&E; (2) $83,340,000 for SCE; and (3) $17,460,000 for SDG&E. Subsequent decisions developed parameters for the program and a handbook. SDG&E has reported they have fully subscribed their funding. PG&E has reported they have awarded nine projects ($43 million). SCE has reported they are reviewing one application.
Deenergization events. In recent years, California has experienced a number of catastrophic wildfires, including several ignited by electrical utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Risks for wildfires also increased with extended drought and bark beetle infestation that has increased tree mortalities and, as a result, increased the fuel, and risk for wildfires. As a result, electrical corporations have increasingly utilized proactive power shutoffs, deenergization of electric distribution (and sometimes transmission) lines, as a tool to prevent igniting wildfires, particularly during high wind event days with dry ground conditions. Although the use of proactive power shutoffs were met with opposition and concerns about its use by affected communities, ultimately the CPUC acknowledged electrical corporations’ authority to deenergize lines in order to protect public safety, noting this authority in Public Utilities Code §451 and §399.2. The CPUC adopted protocols for deenergizing electric lines with a focus on who should receive notice and when, who should be responsible for notification, how different customer groups should be identified. The protocols require electrical corporations to develop work groups that include representatives of the access and functional needs population. As the protocols have evolved over the years, there has been expanded requirements to develop needs assessments and plans to coordinate with identified access and functional needs population, identify critical infrastructure, and coordinate with public safety partners.
Comments
Desire to advance deployment of microgrids and MIP awards to support vulnerable communities. As noted above, both SDG&E and PG&E have deployed their allocated funding for the MIP. The author expresses frustration that SCE has not awarded any projects. He and the supporters of this bill would like to ensure these funds are available to help vulnerable populations who experience repeated deenergization events. This bill would require the CPUC to assess, 15 days after this bill’s enactment, the deployment of the MIP by each of the electrical corporations. If the CPUC determines the electrical corporation has not advanced its share of the MIP, the agency can consider requiring a third-party to administer the electrical corporation’s share of the program and direct remaining funds to areas that have experienced two or more deenergization events with a priority for vulnerable communities (including access and functional needs populations).
Related/Prior Legislation
SB 700 (Wiener, Chapter 839, Statutes of 2018) authorized the CPUC to extend collections up to $166 million in ratepayer funds annually for the SGIP to December 31, 2024.
AB 1144 (Friedman, Chapter 934, Statutes of 2019) required that 10% of SGIP was directed to energy storage and other DER for customers that operate critical facilities or critical infrastructure serving communities in high fire threat districts.
SB 1339 (Stern, Chapter 566, Statutes of 2018) required the CPUC and CEC to facilitate the commercialization of microgrids.
AB 1637 (Low, Chapter 658, Statutes of 2016) doubled the annual funding authorization for SGIP and revised and extended the net energy metering program for fuel cells by five years.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee, one-time costs, possibly in the hundreds of thousands of dollars (ratepayer funds), for the CPUC to implement the provisions of this bill.
SUPPORT: (Verified 5/23/25)
California Association of Recreation & Park Districts
City of Moorpark
City of Thousand Oaks
Coalition of Small and Disabled Veteran Businesses
County of Ventura
Las Virgenes Municipal Water District
OPPOSITION: (Verified 5/23/25)
None received
ARGUMENTS IN SUPPORT: According to the author:
Extreme weather events and the threat of wildfires, and urban fires continue to result in the state’s investor owned utilities initiating Public Safety Power Shutoffs (PSPS) across large portions of their service area. While PSPS commonly last a day, they can also last for many days at a time, or be triggered off and on over a series of days until conditions improve to restore power. However, PSPS events that last just a few days or much longer adversely impact services provided by critical facilities by local governments. They also disproportionately impact vulnerable communities and access and functional needs utility customers who rely on electricity for medical devices and refrigerated medication to preserve their health. To vulnerable and access and functional needs customers PSPS events can actually increase risks to public health. …By maximizing the existing rate-payer incentives we can increase energy resiliency where it does the most good.
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
5/27/25 12:20:12
**** END ****
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
SB 453 (Stern) - Self-generation incentive program: microgrid incentive program
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would repurpose funds collected from utility ratepayers, in lieu of returning unallocated funds to ratepayers, to be instead reallocated to areas that have experienced two or more de-energization events, prioritizing vulnerable communities, as specified.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on May 23, 2025
Fiscal Impact:
- One-time costs, possibly in the hundreds of thousands of dollars (ratepayer funds), for the CPUC to implement the provisions of this bill.
Committee Amendments:
Committee amendments would narrow the scope to the Microgrid incentive program.
-- END --
SENATE COMMITTEE ON APPROPRIATIONS
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
SB 453 (Stern) - Self-generation incentive program: microgrid incentive program
Version: May 6, 2025 | Policy Vote: E., U. & C. 16 - 0 |
Urgency: No | Mandate: Yes |
Hearing Date: May 19, 2025 | Consultant: Ashley Ames |
Bill Summary:
This bill would repurpose funds collected from utility ratepayers, in lieu of returning unallocated funds to ratepayers, to be instead reallocated to areas that have experienced two or more de-energization events, prioritizing vulnerable communities, as specified.
Fiscal Impact:
- The California Public Utilities Commission (CPUC) estimates one-time costs of $436,000 (ratepayer funds) and 2 positions to implement the provisions of this bill.
- To the extent that funds repurposed by this bill would otherwise have been returned to ratepayers, potential costs to the state as a an electric utility ratepayer. The State of California is an electricity customer, purchasing roughly one percent of the state’s electricity. As such, the state could incur costs if ratepayer funds are not returned as provided under existing law (various funds).
Background:
The Self-Generation Incentive Program (SGIP). SGIP provides incentives for distributed energy resources on the customer’s side of the meter, including battery energy storage systems (the primary technology funded by the program), fuel cells, waste heat capture, wind turbines. Existing law authorizes the CPUC, in consultation with the CEC and until December 31, 2024, to authorize the annual collection of not more than double the amount authorized for the SGIP in 2008. Existing law also requires the CPUC to administer the SGIP until January 1, 2026, and requires the CPUC, on January 1, 2026, to provide repayment of all unallocated funds collected to reduce ratepayer costs. (Public Utilities Code §379.6)
Pursuant to statute, the program is funded by $166 million annual collection from investor-owned utility (IOU) ratepayers that is scheduled to sunset at the end of this year. The CPUC estimates there is roughly $68 million remaining that has not been committed. Additionally, non-ratepayer funding was appropriated from the Greenhouse Gas Reduction Fund (GGRF), specifically $280 million from the 2022 California State Budget to fund solar and battery energy storage for low-income residents for a related program. The proposed bill would not impact the GGRF appropriated funding.
Microgrid Incentive Program. SB 1339 (Stern, Chapter 566, Statutes of 2018) required the CPUC and CEC to facilitate the commercialization of microgrids. Since September 2019, the CPUC has held an open and active proceeding (R. 19-09-009) with various decisions, and tracks. Under Track 2 of the proceeding, via CPUC Decision (D. 20-06-017), the CPUC directed PG&E, SDG&E, and SCE to jointly develop a statewide microgrid incentive program (Microgrid Incentive Program or MIP) with a $200 million budget to fund clean energy microgrids to support the critical needs of vulnerable communities impacted by grid outages and test new technologies or regulatory approaches to inform future action. The $200 million budget authorized for the MIP by D.21-01-018 should be appropriated as follows: (1) $79,200,000 for Pacific Gas & Electric (PG&E); (2) $83,340,000 for Southern California Edison (SCE); and (3) $17,460,000 for San Diego Gas & Electric (SDG&E). Subsequent decisions developed parameters for the program and a handbook. SDG&E has reported they have fully subscribed their funding. PG&E has reported they have awarded nine projects ($43 million). SCE has reported they are reviewing one application.
Proposed Law:
This bill would repurpose funds collected from utility ratepayers, in lieu of returning unallocated funds to ratepayers, be instead reallocated to areas that have experienced two or more de-energization events, prioritizing vulnerable communities, as specified. In particular, it would:
- Extend the operation of the SGIP until January 1, 2028, and require the CPUC, on and after January 1, 2026, to allocate all unallocated funds for the program to areas that have experienced two or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations, and prioritizing customers that operate critical community infrastructure that support resiliency during a deenergization event, as specified.
- Require the CPUC, on January 1, 2028, to provide repayment of all unallocated funds collected for purposes of the program to reduce ratepayer costs.
- Require the CPUC to require each electrical corporation to provide to the commission, on or before January 15, 2026, the status of any awarded or unallocated funds for the Microgrid Incentive Program. Require the commission, after reviewing that information and if it determines additional actions are needed, to consider the use of a third-party administrator and to ensure that unallocated funds are allocated to areas that have experienced 2 or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations, and prioritizing customers that operate critical community infrastructure that supports resiliency during a deenergization event..
Related Legislation:
AB 3121 (Petrie Norris) of 2024, proposed to require the CPUC to return specified funds to utility ratepayers from three existing utility ratepayer-funded programs, including SGIP. The bill died in the Senate Energy, Utilities, & Communications Committee.
SB 700 (Wiener, Chapter 839, Statutes of 2018) authorized the CPUC to extend collections up to $166 million in ratepayer funds annually for the SGIP to December 31, 2024.
AB 1144 (Friedman, Chapter 934, Statutes of 2019) required that 10% of SGIP was directed to energy storage and other distributed energy resources for customers that operate critical facilities or critical infrastructure serving communities in high fire threat districts.
SB 1339 (Stern, Chapter 566, Statutes of 2018) required the CPUC and CEC to facilitate the commercialization of microgrids.
AB 1637 (Low, Chapter 658, Statutes of 2016) doubled the annual funding authorization for SGIP and revised and extended the net energy metering program for fuel cells by five years.
AB 1478 (Committee on Budget, Chapter 664, Statutes of 2014) extended the sunset to collect SGIP funds through 2019 and extended the program’s sunset to 2021.
SB 861 (Committee on Budget and Fiscal Review, Chapter 35, Statutes of 2014) established SGIP eligibility restrictions for distributed generation resources and required the CPUC to establish a capacity factor for distributed energy resource technologies.
AB 970 (Ducheny, Chapter 329, Statutes of 2000) enacted the California Energy Security and Reliability Act of 2000 to expedite siting of certain power plants and implement new energy conservation and demand management programs. The bill required the CPUC to establish incentives for distributed generation resources.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Josh Becker, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 4/29/2025
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill would repurpose funds collected from utility ratepayers, in lieu of returning unallocated funds to ratepayers, in order to fund distributed energy resources for specified populations.
ANALYSIS:
Existing law:
- Establishes and vests the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- States the intent of the Legislature that the Self-Generation Incentive Program (SGIP) increase the deployment of distributed generation and energy storage systems to facilitate, among other things, the integration of those resources into the electrical grid. Authorizes the CPUC, in consultation with the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) and until December 31, 2024, to authorize the annual collection of not more than double the amount authorized for the SGIP in 2008. Requires the CPUC to administer the SGIP until January 1, 2026. Requires the CPUC, on January 1, 2026, to provide repayment of all unallocated funds collected to reduce ratepayer costs. (Public Utilities Code §379.6)
- Requires the CPUC, in consultation with the CEC and the California Independent System Operator (CAISO), to take specified actions by December 1, 2020, to facilitate the commercialization of microgrids for distribution customers of large electrical corporations, including, among other actions, by, without shifting costs between ratepayers, developing methods to reduce barriers for microgrid deployment. (Public Utilities Code §8371)
This bill:
- Extends the operation of the SGIP until January 1, 2028, and requires the CPUC, on and after January 1, 2026, to allocate all unallocated funds for the program to areas that have experienced two or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations, and prioritizing customers that operate critical community infrastructure that support resiliency during a deenergization event, as specified.
- Requires the CPUC, on January 1, 2028, to provide repayment of all unallocated funds collected for purposes of the program to reduce ratepayer costs.
- Requires, on and after January 1, 2026, any unallocated funds collected for purposes of the Microgrid Incentive Program to be allocated to areas that have experienced two or more deenergization events, prioritizing vulnerable communities, including access and functional needs populations, and prioritizing customers that operate critical community infrastructure that supports resiliency during a deenergization event.
Background
SGIP. SGIP provides incentives for distributed energy resources on the customer’s side of the meter, including battery energy storage systems (the primary technology funded by the program), fuel cells, waste heat capture, wind turbines. Pursuant to statute, the program is funded by $166 million annual collection from investor-owned utility (IOU) ratepayers that is scheduled to sunset at the end of this year. The CPUC estimates there is roughly $68 million remaining that has not been committed. Additionally, non-ratepayer funding was appropriated from the Greenhouse Gas Reduction Fund (GGRF), specifically $280 million from the 2022 California State Budget to fund solar and battery energy storage for low-income residents for a related program. The proposed bill would not impact the GGRF appropriated funding.
Microgrid Incentive Program. SB 1339 (Stern, Chapter 566, Statutes of 2018) required the CPUC and CEC to facilitate the commercialization of microgrids. Since September 2019, the CPUC has held an open and active proceeding (R. 19-09-009) with various decisions, and tracks. Under Track 2 of the proceeding, via CPUC Decision (D. 20-06-017), the CPUC directed PG&E, SDG&E, and SCE to jointly develop a statewide microgrid incentive program (Microgrid Incentive Program or MIP) with a $200 million budget to fund clean energy microgrids to support the critical needs of vulnerable communities impacted by grid outages and test new technologies or regulatory approaches to inform future action. The $200 million budget authorized for the MIP by D.21-01-018 should be appropriated as follows: (1) $79,200,000 for Pacific Gas & Electric (PG&E); (2) $83,340,000 for Southern California Edison (SCE); and (3) $17,460,000 for San Diego Gas & Electric (SDG&E). Subsequent decisions developed parameters for the program and a handbook. SDG&E has reported they have fully subscribed their funding. PG&E has reported they have awarded nine projects ($43 million). SCE has reported they are reviewing one application.
Comments
Continuing the SGIP program? This bill would reallocate dollars scheduled to be returned to customers, per current statute, from the SGIP funding. As noted above there is roughly $68 million remaining. Per AB 3121 (Petrie Norris, 2024), uncommitted funds would have been returned to utility customers as a credit on their bills in order to offset the increasing costs of utility bills. The bill was held by the author in this committee. On the one hand, a $68 million return to customer may not amount to much of a credit for individual customers. However, to the extent members are concerned about utility bill affordability, they may desire any unallocated funds to be returned to help offset the increasing costs of utility bills. Given that affordability remains top of mind for the Legislature and utility customers, the author and committee may wish to amend this bill to remove the language related to the SGIP program.
MIP need to encourage its deployment. As noted above, both SDG&E and PG&E have deployed their allocated funding for the MIP. The author expresses frustration that SCE has not awarded any projects. He and the supporters of this bill would like to ensure these funds are available to help vulnerable populations who experience repeated deenergization events. However, as currently written, this bill could impede the current efforts to award projects, including by the other utilities. As such, in order to provide oversight and encourage all the utilities are advancing the efforts to deploy the MIP funding for projects per the CPUC order, the author and committee may wish to recast the language related to the MIP:
- Require the CPUC to require each utility, by January 15, 2026, to provide a status update on the projects and dollars awarded within the proceeding.
- Require the CPUC to direct the utilities, if they are found to not have awarded a significant amount of the MIP funds, to consider a third-party administrator for any significant funds that a utility has not awarded in order to meet the requirements of the MIP, as well as, ensure these projects support vulnerable communities, as characterized in this bill.
Prior/Related Legislation
AB 3121 (Petrie Norris) of 2024, proposed to require the CPUC to return specified funds to utility ratepayers from three existing utility ratepayer-funded programs, including SGIP. The bill died in this committee.
SB 700 (Wiener, Chapter 839, Statutes of 2018) authorized the CPUC to extend collections up to $166 million in ratepayer funds annually for the SGIP to December 31, 2024.
AB 1144 (Friedman, Chapter 934, Statutes of 2019) required that 10% of SGIP was directed to energy storage and other distributed energy resources for customers that operate critical facilities or critical infrastructure serving communities in high fire threat districts.
SB 1339 (Stern, Chapter 566, Statutes of 2018) required the CPUC and CEC to facilitate the commercialization of microgrids.
AB 1637 (Low, Chapter 658, Statutes of 2016) doubled the annual funding authorization for SGIP and revised and extended the net energy metering program for fuel cells by five years.
AB 1478 (Committee on Budget, Chapter 664, Statutes of 2014) extended the sunset to collect SGIP funds through 2019 and extended the program’s sunset to 2021.
SB 861 (Committee on Budget and Fiscal Review, Chapter 35, Statutes of 2014) established SGIP eligibility restrictions for distributed generation resources and required the CPUC to establish a capacity factor for distributed energy resource technologies.
AB 970 (Ducheny, Chapter 329, Statutes of 2000) enacted the California Energy Security and Reliability Act of 2000 to expedite siting of certain power plants and implement new energy conservation and demand management programs. The bill required the CPUC to establish incentives for distributed generation resources.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
California Association of Recreation & Park Districts
City of Moorpark
City of Thousand Oaks
Coalition of Small and Disabled Veteran Businesses
Las Virgenes Municipal Water District
OPPOSITION:
None received
ARGUMENTS IN SUPPORT: According to the City of Thousand Oaks:
Senate Bill 453 offers a potential solution by providing cities and public agencies with access to resources for distributed generation and storage projects, enabling them to fortify infrastructure against the detrimental effects of PSPS. Targeted infrastructure may include drinking and wastewater infrastructure, emergency shelters, communication and warning systems, evacuation routes, emergency power and public medical facilities, schools, town halls, hospitals, health clinics, community centers, community nonprofit facilities providing essential services, libraries, homeless shelters, senior and youth centers, childcare facilities, food banks, and parks and recreation sites.
-- END --
Discussed in Hearing
Assembly Standing Committee on Utilities and Energy
Senate Floor
Senate Standing Committee on Appropriations
Senate Standing Committee on Energy, Utilities and Communications
Bill Author
Bill Co-Author(s):