SB 541: Electricity: load shifting.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2025-09-17
Current Status:
Failed
(2026-03-02: Veto sustained.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the specified entities, to adopt a biennial integrated energy policy report containing certain information in a specified format. Existing law requires the Energy Commission, in consultation with the Public Utilities Commission and the Independent System Operator, to adopt a goal for load shifting to reduce net peak electrical demand and adjust this target in each biennial integrated energy policy report thereafter.
This bill would require the Energy Commission, in consultation with specified entities, to analyze the cost-effectiveness of specific load flexibility programs and other types of load-shifting interventions and identify both the approximate amount of load shifting and the cost-effectiveness of each type of load-shifting intervention in the next update to the biennial integrated energy policy report after January 1, 2027, as provided. The bill would require the Energy Commission, as part of each integrated energy policy report, to estimate each retail suppliers load-shifting potential, giving consideration to certain factors, as specified. The bill would require the Energy Commission, on or before July 1, 2028, and biennially thereafter, to analyze and publish the amount of load shifting that each retail supplier achieved in the prior calendar year.
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the specified entities, to adopt a biennial integrated energy policy report containing certain information in a specified format. Existing law requires the Energy Commission, in consultation with the Public Utilities Commission (PUC) and the Independent System Operator, to adopt a goal for load shifting to reduce net peak electrical demand and adjust this target in each biennial integrated energy policy report thereafter.
This bill would require the Energy Commission, in consultation with specified entities, to analyze the cost-effectiveness of specific load flexibility resources and programs and other types of load-shifting interventions and identify both the approximate value amount of load shifting and the cost-effectiveness of each type of load-shifting intervention in the next update to the biennial integrated energy policy report after January 1, 2027, as provided. The bill would require the Energy Commission, as part of each integrated energy policy report, to estimate each retail suppliers load-shifting potential, giving consideration to certain factors, as specified. The bill would require the Energy Commission, on or before July 1, 2028, and biennially thereafter, to analyze and publish the amount of load shifting that each retail supplier achieved in the prior calendar year.
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the specified entities, to adopt a biennial integrated energy policy report containing certain information in a specified format. Existing law requires the Energy Commission, in consultation with the Public Utilities Commission (PUC) and the Independent System Operator, to adopt a goal for load shifting to reduce net peak electrical demand and adjust this target in each biennial integrated energy policy report thereafter.
This bill would require the Energy Commission, in consultation with specified entities, to analyze the cost-effectiveness of specific load flexibility resources and programs and identify both the approximate value and the cost-effectiveness of each load-shifting intervention in the next update to the biennial integrated energy policy report after January 1, 2027, as provided. The bill would require the Energy Commission, as part of each integrated energy policy report, to estimate each retail suppliers load-shifting potential, including giving consideration of to certain factors, as specified. The bill would require the Energy Commission, on or before July 1, 2028, and biennially thereafter, to analyze and publish the amount of load shifting that each retail supplier achieved in the prior calendar year, and the amount of load shifting that each retail supplier is aiming to achieve in future years, in comparison to the load-shifting potential estimated for each retail supplier, as specified. The bill would require the Energy Commission, in consultation with the PUC, the Independent System Operator, and other California balancing authorities, to identify and evaluate barriers to effectively implementing load-shifting strategies, as specified. year.
Existing law requires an electrical corporation to submit to the PUC a distribution resources plan proposal, as specified, to identify optimal locations for the deployment of distributed resources, as defined. Existing law requires the PUC to review and approve, or modify and approve, each distribution resources plan proposal submitted by an electrical corporation.This bill would require the PUC, on or before January 1, 2028, to develop a strategy to reduce the total distribution infrastructure investments required to meet long-term electricity load growth by enabling large electrical corporations to leverage, where cost-effective, distributed resources and load shifting to increase the utilization of existing distribution and transmission infrastructure, increase the effective load-hosting capacity of existing distribution and transmission infrastructure, or provide bridging solutions to enable faster energization of new loads. The bill would require the PUC to take certain actions in support of that strategy, as provided. The bill would require each large electrical corporation to provide relevant distribution planning data to the Energy Commission and to consult with the Energy Commission, as specified.Under existing law, a violation of the Public Utilities Act or an order, decision, rule, direction, demand, or requirement of the PUC is a crime.Because certain provisions of this bill would be part of the act and a violation of a PUC action implementing the requirements of the bill would be a crime, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the specified entities, to adopt a biennial integrated energy policy report containing certain information in a specified format. Existing law requires the Energy Commission, in consultation with the Public Utilities Commission (PUC) and the Independent System Operator, to adopt a goal for load shifting to reduce net peak electrical demand and adjust this target in each biennial integrated energy policy report thereafter.
This bill would require the Energy Commission, in consultation with specified entities, to analyze the cost-effectiveness of specific load flexibility resources and programs and identify both the approximate value and the cost-effectiveness of each load-shifting intervention in the next update to the biennial integrated energy policy report after January 1, 2027, as provided. The bill would require the Energy Commission, as part of each integrated energy policy report, to divide the load shifting needed to reach the above-described load-shifting goal, including biennial adjustments to the goal, across retail suppliers, as defined, based on the commissions estimate of each retail suppliers load-shifting potential, including consideration of the relative share of statewide load of each retail supplier, and other relevant certain factors, as specified. The bill would require the Energy Commission, on or before July 1, 2028, and biennially thereafter, to analyze and publish the amount of load shifting that each retail supplier achieved in the prior calendar year, and the amount of load shifting that each retail supplier is aiming to achieve in future years, in comparison to the load-shifting potential estimated for each retail supplier, as specified. The bill would require the Energy Commission, in consultation with the PUC, the Independent System Operator, and other California balancing authorities, to identify and evaluate barriers to effectively implementing load-shifting strategies, as specified.
Existing law requires an electrical corporation to submit to the PUC a distribution resources plan proposal, as specified, to identify optimal locations for the deployment of distributed resources, as defined. Existing law requires the PUC to review and approve, or modify and approve, each distribution resources plan proposal submitted by an electrical corporation.
This bill would require the PUC, on or before January 1, 2028, to develop a strategy to reduce the total distribution infrastructure investments required to meet long-term electricity load growth by enabling large electrical corporations to leverage leverage, where cost-effective, distributed resources and load shifting to increase the utilization of existing distribution and transmission infrastructure, increase the effective load-hosting capacity of existing distribution and transmission infrastructure, or provide bridging solutions to enable faster energization of new loads, and reduce the total distribution infrastructure investment required to meet long-term electricity load growth. loads. The bill would require the PUC to take certain actions in support of that strategy, as provided. The bill would require the PUC to ensure that a large electrical corporation has made reasonable efforts to increase cost-effective load shifting or other types of peak demand reduction, as specified, before determining that an investment by the large electrical corporation to increase distribution system capacity is just and reasonable, as specified. The bill would require each large electrical corporation to provide relevant distribution planning data to the Energy Commission and to consult with the Energy Commission, as specified.
Under existing law, a violation of the Public Utilities Act or an order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain provisions of this bill would be part of the act and a violation of a PUC action implementing the requirements of this the bill would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the specified entities, to adopt a biennial integrated energy policy report containing certain information in a specified format. Existing law requires the Energy Commission, in consultation with the Public Utilities Commission (PUC) and the Independent System Operator, to adopt a goal for load shifting to reduce net peak electrical demand and adjust this target in each biennial integrated energy policy report thereafter.
This bill would require the Energy Commission, as part of each integrated energy policy report, to allocate divide the load shifting needed to reach the above-described load-shifting goal, including biennial adjustments to the goal, to each across retail supplier, suppliers, as defined, based on the commissions estimate of its each retail suppliers load-shifting potential, including consideration of the relative share of statewide load of each retail supplier, and other relevant factors, as specified. The bill would require the Energy Commission, on or before July 1, 2028, and biennially thereafter, to evaluate analyze and publish the amount of load shifting that each retail supplier achieved in the prior calendar year, and the amount of load shifting that each retail supplier is expected aiming to achieve in future years, in comparison to the load shifting allocated to the load-shifting potential estimated for each retail supplier, as specified. The bill would require the Energy Commission, in consultation with the PUC and PUC, the Independent System Operator, and other California balancing authorities, to identify and evaluate barriers to effectively implementing load-shifting strategies and to establish a location-based avoided cost metric that estimates the value of demand reduction at different times and locations, strategies, as specified.
Existing law requires an electrical corporation to submit to the PUC a distribution resources plan proposal, as specified, to identify optimal locations for the deployment of distributed resources, as defined. Existing law requires the PUC to review and approve, or modify and approve, each distribution resources plan proposal submitted by an electrical corporation.
This bill would require the PUC, on or before January 1, 2028, to develop a strategy to leverage distributed resources and load shifting to increase the utilization of existing distribution and transmission infrastructure, increase the effective load-hosting capacity of existing distribution and transmission infrastructure, provide bridging solutions to enable faster energization of new loads, and reduce the total distribution infrastructure investment required to meet long-term electricity load growth. The bill would require the PUC to take certain actions in support of that strategy, as provided. The bill would require the PUC to ensure that a large electrical corporation has made reasonable efforts to increase cost-effective load shifting or other types of peak demand reduction, as specified, before determining that an investment by the large electrical corporation to increase distribution system capacity is just and reasonable, as specified. The bill would require each large electrical corporation to provide relevant distribution planning data to the Energy Commission and to consult with the Energy Commission, as specified.
Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because a violation of a PUC action implementing the requirements of this bill would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the specified entities, to adopt a biennial integrated energy policy report containing certain information in a specified format. Existing law requires the Energy Commission, in consultation with the Public Utilities Commission (PUC) and the Independent System Operator, to adopt a goal for load shifting to reduce net peak electrical demand and adjust this target in each biennial integrated energy policy report thereafter.
This bill would require the Energy Commission, as part of each integrated energy policy report, to allocate the load shifting needed to reach the above-described load-shifting goal, including biennial adjustments to the goal, to each retail supplier, as defined, based on the commissions estimate of its load-shifting potential, including consideration of the relative share of statewide load of each retail supplier, and other relevant factors, as specified. The bill would require the Energy Commission, on or before July 1, 2028, and biennially thereafter, to evaluate and publish the amount of load shifting that each retail supplier achieved in the prior calendar year, and the amount of load shifting that each retail supplier is expected to achieve in future years, in comparison to the load shifting allocated to the retail supplier, as specified. The bill would require the Energy Commission, in consultation with the PUC and the Independent System Operator, to identify and evaluate barriers to effectively implement implementing load-shifting strategies and to establish a location-based avoided cost metric that estimates the value of demand reduction at different times and locations, as specified.
Existing law vests the PUC with regulatory jurisdiction over public utilities, including electrical corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable.This bill would require the PUC, as part of a new or existing proceeding, to consider whether larger differentials between peak and off-peak time-of-use periods, including larger differentials for the transmission and distribution portion of rates, would be a cost-effective way to address peak load, and whether distinguishing between nighttime off-peak and daytime off-peak periods would be a cost-effective way to align flexible load with periods of abundant renewable and zero-carbon energy.Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the specified entities, to adopt a biennial integrated energy policy report containing certain information in a specified format. Existing law requires the Energy Commission, in consultation with the Public Utilities Commission (PUC) and the Independent System Operator, to adopt a goal for load shifting to reduce net peak electrical demand and adjust this target in each biennial integrated energy policy report thereafter.
This bill would require the Energy Commission, as part of each integrated energy policy report, to allocate the incremental load shifting needed to reach the above-described load-shifting goal, including biennial adjustments to the goal, to each retail supplier, as defined, based on the commissions estimate of its load-shifting potential, including consideration of the relative share of statewide load of each retail supplier, and other relevant factors, as specified. The bill would require the Energy Commission to establish rules for evaluating the effectiveness of the various load-shifting strategies for the purpose of determining how much credit a retail supplier should get for each type of load flexibility effort it undertakes, as specified. Commission, on or before July 1, 2028, and biennially thereafter, to evaluate and publish the amount of load shifting that each retail supplier achieved in the prior calendar year, and the amount of load shifting that each retail supplier is expected to achieve in future years, in comparison to the load shifting allocated to the retail supplier, as specified. The bill would require the Energy Commission, in consultation with the PUC and the Independent System Operator, to identify and evaluate barriers to effectively implement load-shifting strategies and to establish a location-based avoided cost metric that estimates the value of demand reduction at different times and locations, as specified.
Existing law requires the PUC to adopt a process for each load-serving entity, as defined, to file an integrated resource plan and a schedule for periodic updates to the plan and to ensure that load-serving entities, among other things, enhance distribution systems and demand-side energy management.This bill would instead require that load-serving entities meet the incremental load-shifting goal established pursuant to the above-described provisions, to the extent that the goal is cost effective, as specified.Existing law vests the PUC with regulatory jurisdiction over public utilities, including electrical corporations, while local publicly owned electric utilities are under the direction of their governing board. corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable.
This bill would require all retail suppliers, as defined, to provide rate information to the Energy Commissions Market-Informed Demand Automation Server in order to provide third-party devices with access to real-time rate information for the purpose of efficiently automating load flexibility. The bill would require the commission, on or before January 1, 2028, to require all load-serving entities to offer optional dynamic pricing tariffs, as specified, and the governing boards of each local publicly owned electric utility to consider offering dynamic pricing tariffs, as specified. The bill would require the commission, the PUC, as part of a new or existing proceeding, to consider (1) whether larger differentials between peak and off-peak time-of-use periods, including larger differentials for the transmission and distribution portion of rates, would be a cost-effective way to address peak load, and (2) whether distinguishing between nighttime off-peak and daytime off-peak periods would be a cost-effective way to align flexible load with periods of abundant renewable and zero-carbon energy.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.Because certain provisions of this bill would be part of the act and a violation of a PUC action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.Additionally, by imposing new duties on local publicly owned electric utilities, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for specified reasons.Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the specified entities, to adopt a biennial integrated energy policy report containing certain information in a specified format. Existing law requires the Energy Commission, in consultation with the Public Utilities Commission (PUC) and the Independent System Operator, to adopt a goal for load shifting to reduce net peak electrical demand and adjust this target in each biennial integrated energy policy report thereafter.
This bill would require the Energy Commission, as part of each integrated energy policy report, to allocate the incremental load shifting needed to reach the above-described load-shifting goal, including biennial adjustments to the goal, to each retail supplier, as defined, based on the relative share of statewide load of each retail supplier, as specified. The bill would require the Energy Commission to establish rules for evaluating the effectiveness of the various load-shifting strategies for the purpose of determining how much credit a retail supplier should get for each type of load flexibility effort it undertakes, as specified.
Existing law requires the PUC to adopt a process for each load-serving entity, as defined, to file an integrated resource plan and a schedule for periodic updates to the plan and to ensure that load-serving entities, among other things, enhance distribution systems and demand-side energy management.
This bill would instead require that load-serving entities meet the incremental load-shifting goal established pursuant to the above-described provisions, to the extent that the goal is cost effective, as specified.
Existing law vests the PUC with regulatory jurisdiction over public utilities, including electrical corporations, while local publicly owned electric utilities are under the direction of their governing board.
This bill would require all retail suppliers, as defined, to provide rate information to the Energy Commissions Market-Informed Demand Automation Server in order to provide third-party devices with access to real-time rate information for the purpose of efficiently automating load flexibility. The bill would require the commission, on or before January 1, 2028, to require all load-serving entities to offer optional dynamic pricing tariffs, as specified, and the governing boards of each local publicly owned electric utility to consider offering dynamic pricing tariffs, as specified. The bill would require the commission, as part of a new or existing proceeding, to consider (1) whether larger differentials between peak and off-peak time-of-use periods, including larger differentials for the transmission and distribution portion of rates, would be a cost-effective way to address peak load, and (2) whether distinguishing between nighttime off-peak and daytime off-peak periods would be a cost-effective way to align flexible load with periods of abundant renewable and zero-carbon energy.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain provisions of this bill would be part of the act and a violation of a PUC action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
Additionally, by imposing new duties on local publicly owned electric utilities, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law, until June 30, 2029, authorizes a person proposing an eligible facility, as defined, to submit an application for certification of the site and related facility with the State Energy Resources Conservation and Development Commission. Existing law specifies that the issuance by the commission of the certificate is in lieu of any permit, certificate, or similar document required by any state, local, or regional agency, or federal agency to the extent permitted by federal law, except as provided. Existing law establishes the procedures by which the commission is to review the application.This bill would make nonsubstantive changes to the definitions governing those provisions.Existing law, until June 30, 2029, authorizes a person proposing an eligible facility, as defined, to submit an application for certification of the site and related facility with the State Energy Resources Conservation and Development Commission. Existing law specifies that the issuance by the commission of the certificate is in lieu of any permit, certificate, or similar document required by any state, local, or regional agency, or federal agency to the extent permitted by federal law, except as provided. Existing law establishes the procedures by which the commission is to review the application.
This bill would make nonsubstantive changes to the definitions governing those provisions.
(a)The Legislature finds and declares all of the following:
(1)To ensure reliability, the electrical grid must be sized to handle the highest anticipated loads over a multiyear period. As a result, new investment in the electrical grid is often driven by the need to support those peak loads.
(2)Outside of peak load hours, the electrical grid has significant available capacity. According to the Independent System Operators (CAISO) 2023 Annual Report on Market Issues & Performance, average system load was only about 46 percent of the peak system load during 201923.
(3)According to a 2025 report from Duke Universitys Nicholas Institute for Energy, Environment & Sustainability entitled Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems, the CAISO grid could support an additional 5,900 megawatts of load, approximately 10 percent of the systems highest ever load, outside of the 1 percent of hours with the highest load annually.
(4)The State Energy Resources Conservation and Development Commission (Energy Commission), in its SB 846 Load-Shift Goal Commission Report (2023), estimated that the state could achieve 7,000 megawatts of load shifting by 2030.
(5)Many sources of potential load flexibility already exist, including customer-sited energy storage and the ability to adjust the timing of smart thermostats and water heaters, electric vehicle charging, and pumping loads.
(6)Using that load flexibility to reduce peak load could be a cost-saving opportunity that can reward consumers who provide that load flexibility and can reduce rates for the benefit of all utility customers. An April 2024 study by The Brattle Group entitled Californias Virtual Power Potential: How Five Consumer Technologies Could Improve the States Energy Affordability found that load flexibility could save California consumers five hundred fifty million dollars ($550,000,000) per year by 2035 in reduced costs for traditional generation facilities.
(7)Fleets of distributed resources that are operated automatically to provide load flexibility can often be built and interconnected to the electrical grid more quickly than large-scale infrastructure projects.
(8)Load flexibility can also reduce peak loads in a way that increases the available capacity to serve new customers on the distribution grid, which can accelerate energization of new housing, electric vehicle charging loads, data centers, and other sources of economic growth, provided the distribution utility can control the timing of the load flexibility in order to serve distribution grid needs and can rely on the load flexibility when forecasting future needs during its distribution planning process.
(9)However, today there are few effective programs or incentives to encourage the load flexibility, which may be developed primarily to address systemwide needs, to be sited and controlled so that local distribution grid benefits, such as reducing local distribution grid peaks and increasing the use of existing distribution assets, can also be realized as cobenefits.
(10)Creating a strategy to encourage load flexibility to be sited and controlled to support flexibility at the distribution level could enable cost-effective ways to accelerate support for new customers while getting the most value out of electrical grid assets that ratepayers have already paid for and minimizing the total new investment required to support anticipated long-term electricity demand growth.
(b)It is the intent of the Legislature to support efforts by the Energy Commission, the Public Utilities Commission, load-serving entities, and local publicly owned electric utilities to leverage cost-effective load flexibility to serve growing electricity demand in the most affordable way possible that benefits both participating and nonparticipating customers, and to apply lessons learned from past efforts at these entities, rather than recreating past programs with unclear ratepayer, participant, and electrical grid benefits.
SEC. 2.Section 25302.7 of the Public Resources Code is amended to read:25302.7.(a)(1)By June 1, 2023, the commission, in consultation with the Public Utilities Commission and the Independent System Operator, shall adopt a goal for load shifting to reduce net peak electrical demand and shall adjust this target in each biennial integrated energy policy report prepared pursuant to Section 25302 thereafter. In developing this target, the commission shall consider the findings of the 2020 Lawrence Berkeley National Laboratory report on the Shift Resource through 2030 and other relevant research. The commission, in consultation with the Public Utilities Commission, the Independent System Operator, and other California balancing authorities, shall recommend policies to increase demand response and load shifting that do not increase greenhouse gas emissions or increase electricity rates.
(2)In the next update to the biennial integrated energy policy report prepared pursuant to Section 25302 after January 1, 2027, the commission, in consultation with the Public Utilities Commission, the Independent System Operator, and other California balancing authorities, shall analyze the cost-effectiveness of specific load flexibility programs and other types of load-shifting interventions and identify both the approximate amount of load shifting each type of load-shifting intervention identified in the report published pursuant to paragraph (1) contributes to the overall 2030 load-shift goal and the cost-effectiveness of each type of load-shifting intervention and the cost-effectiveness of the specific programs evaluated.
(b)(1)As part of each integrated energy policy report adopted pursuant to Section 25302, the commission shall estimate each retail suppliers load-shifting potential, giving consideration to the relative share of statewide load of each retail supplier, the limitations in each retail suppliers service territory to adopting load-shifting strategies, the cost-effectiveness of load-shifting resources and programs, and other relevant factors, as determined by the commission.
(2)In estimating the load-shifting potential pursuant to paragraph (1), the commission shall exclude the load shifting expected to be met by emergency programs, including the Demand Side Grid Support Program (Article 3 (commencing with Section 25792) of Chapter 8.9) and the Emergency Load Reduction Program established by the Public Utilities Commission in Decision 21-03-056 (March 25, 2021), Decision Directing Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company to Take Actions to Prepare for Potential Extreme Weather in the Summers of 2021 and 2022.
(c)(1)On or before July 1, 2028, and biennially thereafter, the commission shall analyze and publish, on its internet website, the amount of load shifting that each retail supplier achieved in the prior calendar year.
(2)In support of the analysis pursuant to paragraph (1), the commission shall establish standards for estimating the amount of load shifting for each type of load flexibility effort that retail suppliers undertake. These standards shall be periodically updated as the commission learns more about the impact of load-shifting strategies.
(d)(1)This section does not impose a binding obligation or otherwise mandate the procurement of load-shifting technologies by retail suppliers.
(2)This section is not intended to abridge or otherwise supplant the authority of the governing boards of community choice aggregators or local publicly owned electric utilities to set rates, establish programs, and create goals.
(e)For purposes of this section, all of the following definitions apply:
(1)California balancing authority has the same meaning as defined in Section 399.12 of the Public Utilities Code.
(2)Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code.
(3)Electric service provider has the same meaning as defined in Section 218.3 of the Public Utilities Code.
(4)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(5)(A)Load shifting means a reduction in aggregate demand that benefits the electrical grid, including by reducing the need for peak generation capacity and investments in transmission or distribution infrastructure.
(B)Load shifting may include either of the following:
(i)Load-modifying resources, including the use of time-varying rates to induce load flexibility and the use of demand flexibility resources, distribution-connected renewable generation and energy storage resources, or other programs to alter a retail suppliers load forecast.
(ii)Supply-side load flexibility resources, including resources that provide resource adequacy and other demand response resources.
(C)Load shifting does not include the use of backup generators powered by fossil fuels, or any other generation resources that are not renewable or zero-carbon generation resources, to reduce electrical grid demand.
(6)Local publicly owned electric utility has the same meaning as defined in Section 224.3 of the Public Utilities Code.
(7)Retail supplier means an electrical corporation, community choice aggregator, electric service provider, or local publicly owned electric utility. Retail supplier does not include an electrical corporation with 60,000 or fewer customer accounts in the state or a retail supplier with an annual electrical demand of less than 1,000 gigawatthours.
(a)The Legislature finds and declares all of the following:
(1)To ensure reliability, the electrical grid must be sized to handle the highest anticipated loads over a multiyear period. As a result, new investment in the electrical grid is often driven by the need to support those peak loads.
(2)Outside of peak load hours, the electrical grid has significant available capacity. According to the Independent System Operators (CAISO) 2023 Annual Report on Market Issues & Performance, average system load was only about 46 percent of the peak system load during 201923.
(3)According to a 2025 report from Duke Universitys Nicholas Institute for Energy, Environment & Sustainability entitled Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems, the CAISO grid could support an additional 5,900 megawatts of load, approximately 10 percent of the systems highest ever load, outside of the 1 percent of hours with the highest load annually.
(4)The State Energy Resources Conservation and Development Commission (Energy Commission), in its SB 846 Load-Shift Goal Commission Report (2023), estimated that the state could achieve 7,000 megawatts of load shifting by 2030.
(5)Many sources of potential load flexibility already exist, including customer-sited energy storage and the ability to adjust the timing of smart thermostats and water heaters, electric vehicle charging, and pumping loads.
(6)Using that load flexibility to reduce peak load could be a cost-saving opportunity that can reward consumers who provide that load flexibility and can reduce rates for the benefit of all utility customers. An April 2024 study by The Brattle Group entitled Californias Virtual Power Potential: How Five Consumer Technologies Could Improve the States Energy Affordability found that load flexibility could save California consumers five hundred fifty million dollars ($550,000,000) per year by 2035 in reduced costs for traditional generation facilities.
(7)Fleets of distributed resources that are operated automatically to provide load flexibility can often be built and interconnected to the electrical grid more quickly than large-scale infrastructure projects.
(8)Load flexibility can also reduce peak loads in a way that increases the available capacity to serve new customers on the distribution grid, which can accelerate energization of new housing, electric vehicle charging loads, data centers, and other sources of economic growth, provided the distribution utility can control the timing of the load flexibility in order to serve distribution grid needs and can rely on the load flexibility when forecasting future needs during its distribution planning process.
(9)However, today there are few effective programs or incentives to encourage the load flexibility, which may be developed primarily to address systemwide needs, to be sited and controlled so that local distribution grid benefits, such as reducing local distribution grid peaks and increasing the use of existing distribution assets, can also be realized as cobenefits.
(10)Creating a strategy to encourage load flexibility to be sited and controlled to support flexibility at the distribution level could enable cost-effective ways to accelerate support for new customers while getting the most value out of electrical grid assets that ratepayers have already paid for and minimizing the total new investment required to support anticipated long-term electricity demand growth.
(b)It is the intent of the Legislature to support efforts by the Energy Commission, the Public Utilities Commission, load-serving entities, and local publicly owned electric utilities to leverage cost-effective load flexibility to serve growing electricity demand in the most affordable way possible that benefits both participating and nonparticipating customers, and to apply lessons learned from past efforts at these entities, rather than recreating past programs with unclear ratepayer, participant, and electrical grid benefits.
SEC. 2.Section 25302.7 of the Public Resources Code is amended to read:25302.7.(a)(1)By June 1, 2023, the commission, in consultation with the Public Utilities Commission and the Independent System Operator, shall adopt a goal for load shifting to reduce net peak electrical demand and shall adjust this target in each biennial integrated energy policy report prepared pursuant to Section 25302 thereafter. In developing this target, the commission shall consider the findings of the 2020 Lawrence Berkeley National Laboratory report on the Shift Resource through 2030 and other relevant research. The commission, in consultation with the Public Utilities Commission, the Independent System Operator, and other California balancing authorities, shall recommend policies to increase demand response and load shifting that do not increase greenhouse gas emissions or increase electricity rates.
(2)In the next update to the biennial integrated energy policy report prepared pursuant to Section 25302 after January 1, 2027, the commission, in consultation with the Public Utilities Commission, the Independent System Operator, and other California balancing authorities, shall analyze the cost-effectiveness of specific load flexibility resources and programs and other types of load-shifting interventions and identify both the approximate value amount of load shifting each type of load-shifting intervention identified in the report published pursuant to paragraph (1) contributes to the overall 2030 load-shift goal and the cost-effectiveness of each type of load-shifting intervention and the cost-effectiveness of the specific resources and programs contributing to that intervention. evaluated.
(b)(1)As part of each integrated energy policy report adopted pursuant to Section 25302, the commission shall estimate each retail suppliers load-shifting potential, giving consideration to the relative share of statewide load of each retail supplier, the limitations in each retail suppliers service territory to adopting load-shifting strategies, the cost-effectiveness of load-shifting resources and programs, and other relevant factors, as determined by the commission.
(2)In estimating the load-shifting potential pursuant to paragraph (1), the commission shall exclude the load shifting expected to be met by emergency programs, including the Demand Side Grid Support Program (Article 3 (commencing with Section 25792) of Chapter 8.9) and the Emergency Load Reduction Program established by the Public Utilities Commission in Decision 21-03-056 (March 25, 2021), Decision Directing Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company to Take Actions to Prepare for Potential Extreme Weather in the Summers of 2021 and 2022.
(c)(1)On or before July 1, 2028, and biennially thereafter, the commission shall analyze and publish, on its internet website, the amount of load shifting that each retail supplier achieved in the prior calendar year.
(2)In support of the analysis pursuant to paragraph (1), the commission shall establish standards for estimating the amount of load shifting for each type of load flexibility effort that retail suppliers undertake. These standards shall be periodically updated as the commission learns more about the impact of load-shifting strategies.
(d)(1)This section does not impose a binding obligation or otherwise mandate the procurement of load-shifting technologies by retail suppliers.
(2)This section is not intended to abridge or otherwise supplant the authority of the governing boards of community choice aggregators or local publicly owned electric utilities to set rates, establish programs, and create goals.
(e)For purposes of this section, all of the following definitions apply:
(1)California balancing authority has the same meaning as defined in Section 399.12 of the Public Utilities Code.
(2)Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code.
(3)Electric service provider has the same meaning as defined in Section 218.3 of the Public Utilities Code.
(4)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(5)(A)Load shifting means a reduction in aggregate demand that benefits the electrical grid, including by reducing the need for peak generation capacity and investments in transmission or distribution infrastructure.
(B)Load shifting may include either of the following:
(i)Load-modifying resources, including the use of time-varying rates to induce load flexibility and the use of demand flexibility resources, distribution-connected renewable generation and energy storage resources, or other programs to alter a retail suppliers load forecast.
(ii)Supply-side load flexibility resources, including resources that provide resource adequacy and other demand response resources.
(C)Load shifting does not include the use of backup generators, generators powered by fossil fuels, or any other greenhouse-gas-emitting resources, generation resources that are not renewable or zero-carbon generation resources, to reduce electrical grid demand.
(6)Local publicly owned electric utility has the same meaning as defined in Section 224.3 of the Public Utilities Code.
(7)Retail supplier means an electrical corporation, community choice aggregator, electric service provider, or local publicly owned electric utility. Retail supplier does not include an electrical corporation with 60,000 or fewer customer accounts in the state or a retail supplier with an annual electrical demand of less than 1,000 gigawatthours.
(a)The Legislature finds and declares all of the following:
(1)To ensure reliability, the electrical grid must be sized to handle the highest anticipated loads over a multiyear period. As a result, new investment in the electrical grid is often driven by the need to support those peak loads.
(2)Outside of peak load hours, the electrical grid has significant spare available capacity. According to the Independent System Operators (CAISO) 2023 Annual Report on Market Issues & Performance, average system load was only about 46 percent of the peak system load during 201923.
(3)According to a 2025 report from Duke Universitys Nicholas Institute for Energy, Environment & Sustainability entitled Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems, the CAISO grid could support an additional 5,900 megawatts of load, approximately 10 percent of the systems highest ever load, outside of the 1 percent of hours with the highest load annually.
(4)The State Energy Resources Conservation and Development Commission (Energy Commission), in its SB 846 Load-Shift Goal Commission Report (2023), estimated that the state could achieve 7,000 megawatts of load shifting by 2030.
(5)Many sources of potential load flexibility already exist, including customer-sited energy storage and the ability to adjust the timing of smart thermostats and water heaters, electric vehicle charging, and pumping loads.
(6)Using that load flexibility to reduce peak load could be a cost-saving opportunity that can reward consumers who provide that load flexibility and can reduce rates for the benefit of all utility customers. An April 2024 study by The Brattle Group entitled Californias Virtual Power Potential: How Five Consumer Technologies Could Improve the States Energy Affordability found that load flexibility could save California consumers five hundred fifty million dollars ($550,000,000) per year by 2035 in reduced costs for traditional generation facilities.
(7)Fleets of distributed resources that are operated automatically to provide load flexibility can often be built and interconnected to the electrical grid more quickly than large-scale infrastructure projects.
(8)Load flexibility can also reduce peak loads in a way that increases the available capacity to serve new customers on the distribution grid, which can accelerate energization of new housing, electric vehicle charging loads, data centers, and other sources of economic growth, provided the distribution utility can control the timing of the load flexibility in order to serve distribution grid needs and can rely on the load flexibility when forecasting future needs during its distribution planning process.
(9)However, today there are few effective programs or incentives to encourage the load flexibility, which may be developed primarily to address systemwide needs, to be sited and controlled so that local distribution grid benefits, such as reducing local distribution grid peaks and increasing the use of existing distribution assets, can also be realized as cobenefits.
(10)Creating a strategy to encourage load flexibility to be sited and controlled to support flexibility at the distribution level could enable cost-effective ways to accelerate support for new customers while getting the most value out of electrical grid assets that ratepayers have already paid for and minimizing the total new investment required to support anticipated long-term electricity demand growth.
(b)It is the intent of the Legislature to support efforts by the Energy Commission, the Public Utilities Commission, load-serving entities, and local publicly owned electric utilities to leverage cost-effective load flexibility to serve growing electricity demand in the most affordable way possible, possible that benefits both participating and nonparticipating customers, and to apply lessons learned from past efforts at these entities, rather than recreating past programs with unclear ratepayer, participant, and electrical grid benefits.
SEC. 2.Section 25302.7 of the Public Resources Code is amended to read:25302.7.(a)(1)By June 1, 2023, the commission, in consultation with the Public Utilities Commission and the Independent System Operator, shall adopt a goal for load shifting to reduce net peak electrical demand and shall adjust this target in each biennial integrated energy policy report prepared pursuant to Section 25302 thereafter. In developing this target, the commission shall consider the findings of the 2020 Lawrence Berkeley National Laboratory report on the Shift Resource through 2030 and other relevant research. The commission, in consultation with the Public Utilities Commission, the Independent System Operator, and other California balancing authorities, shall recommend policies to increase demand response and load shifting that do not increase greenhouse gas emissions or increase electricity rates.
(2)In the next update to the biennial integrated energy policy report prepared pursuant to Section 25302 after January 1, 2027, the commission, in consultation with the Public Utilities Commission, the Independent System Operator, and other California balancing authorities, shall analyze the cost-effectiveness of specific load flexibility resources and programs and identify both the approximate value each load-shifting intervention identified in the report published pursuant to paragraph (1) contributes to the overall 2030 load-shift goal and the cost-effectiveness of each intervention and the cost-effectiveness of the specific resources and programs contributing to that intervention.
(b)(1)As part of each integrated energy policy report adopted pursuant to Section 25302, the commission shall estimate each retail suppliers load-shifting potential, including giving consideration of to the relative share of statewide load of each retail supplier, the limitations in each retail suppliers service territory to adopting load-shifting strategies, the cost-effectiveness of load-shifting resources and programs, and other relevant factors, as determined by the commission.
(2)In estimating the load-shifting potential pursuant to paragraph (1), the commission shall exclude the load shifting expected to be met by emergency programs, including the Demand Side Grid Support Program (Article 3 (commencing with Section 25792) of Chapter 8.9) and the Emergency Load Reduction Program established by the Public Utilities Commission in Decision 21-03-056 (March 25, 2021), Decision Directing Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company to Take Actions to Prepare for Potential Extreme Weather in the Summers of 2021 and 2022.
(c)(1)On or before July 1, 2028, and biennially thereafter, the commission shall analyze and publish, on its internet website, the amount of load shifting that each retail supplier achieved in the prior calendar year, and the amount of load shifting that each retail supplier is aiming to achieve in future years based on its most recent integrated resource plan and other relevant data, as determined by the commission, in comparison to the load-shifting potential estimated for each retail supplier pursuant to subdivision (b). year.
(2)In support of the analysis pursuant to paragraph (1), the commission shall establish standards for estimating the amount of load shifting that has been, or will be, achieved by for each type of load flexibility effort that retail suppliers undertake. These standards shall be periodically updated as the commission learns more about the impact of load-shifting strategies.
(d)The commission, in consultation with the Public Utilities Commission, the Independent System Operator, and other California balancing authorities, shall identify and evaluate barriers to effectively implementing load-shifting strategies, including the ability to qualify for or reduce resource adequacy obligations, cost-effectiveness of programs and resources and limitations in a retail sellers ability to effectuate programs. The commission shall recommend to the Legislature methods to eliminate or reduce those barriers in each biennial integrated energy policy report prepared pursuant to Section 25302.(e)(d)(1)This section does not impose a binding obligation or otherwise mandate the procurement of load-shifting technologies by retail suppliers.
(2)This section is not intended to abridge or otherwise supplant the authority of the governing boards of community choice aggregators or local publicly owned electric utilities to set rates, establish programs, and create goals.
(f)(e)For purposes of this section, all of the following definitions apply:
(1)California balancing authority has the same meaning as defined in Section 399.12 of the Public Utilities Code.
(2)Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code.
(3)Electric service provider has the same meaning as defined in Section 218.3 of the Public Utilities Code.
(4)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(5)(A)Load shifting means a reduction in aggregate demand that benefits the electrical grid, including by reducing the need for peak generation capacity and investments in transmission or distribution infrastructure.
(B)Load shifting may include either of the following:
(i)Load-modifying resources, including the use of time-varying rates to induce load flexibility and the use of demand flexibility resources, distribution-connected renewable generation and energy storage resources, or other programs to alter a retail suppliers load forecast.
(ii)Supply-side load flexibility resources, including resources that provide resource adequacy and other demand response resources.
(C)Load shifting does not include the use of backup generators, or any other greenhouse-gas-emitting resources, to reduce electrical grid demand.
(6)Local publicly owned electric utility has the same meaning as defined in Section 224.3 of the Public Utilities Code.
(7)Retail supplier means an electrical corporation, community choice aggregator, electric service provider, or local publicly owned electric utility. Retail supplier does not include an electrical corporation with 60,000 or fewer customer accounts in the state or a retail supplier with an annual electrical demand of less than 1,000 gigawatthours.
SEC. 3.Section 769.1 is added to the Public Utilities Code, to read:769.1.(a)(1)On or before January 1, 2028, the commission shall develop a strategy to reduce the total distribution infrastructure investments required to meet long-term electricity load growth by enabling large electrical corporations to leverage, where cost-effective, distributed resources and load shifting to increase the utilization of existing distribution and transmission infrastructure, increase the effective load-hosting capacity of existing distribution and transmission infrastructure, or provide bridging solutions to enable faster energization of new loads.(2)The strategy developed pursuant to paragraph (1) shall be fully consistent with Section 399.2.(b)In support of the strategy developed pursuant to subdivision (a), the commission shall require each large electrical corporation, as part of their integration capacity analysis data or a successor policy, to make data available to the public that quantifies the potential for increased utilization of segments of its distribution grid by reducing peak load, including all of the following:(1)A capacity utilization metric that measures the total energy delivered over a distribution segment during a period of time divided by the maximum energy that could have been delivered according to that distribution segments maximum capacity.(2)An off-peak load-hosting capacity metric that estimates the capacity of a distribution segment to support new loads outside of the 1 percent of hours with the highest peak load annually for that distribution segment, or data providing a similar quantification of off-peak capacity, as determined by the commission.(3)The location and boundaries of constrained distribution areas with sufficient detail to allow third parties to identify customer locations where distributed resources could benefit the constrained distribution area.(c)(1)In support of the strategy developed pursuant to subdivision (a), the commission shall direct each large electrical corporation to implement programs, rate designs, or other incentives identified by the commission to enable the development of cost-effective load-shifting capacity or other peak demand reduction in constrained distribution areas, especially where the metrics required under subdivision (b) indicate significant opportunity for peak demand reduction to increase the available load-hosting capacity of that segment of the distribution grid.(2)Each large electrical corporation shall consider available load-shifting capacity or other peak demand reduction in its annual distribution system planning. The large electrical corporation shall rely on this capacity or demand reduction in its distribution system planning if both of the following conditions are met:(A)The large electrical corporation can control the timing of the use of the load-shifting capacity or demand reduction for meeting distribution grid needs.(B)Creating and relying on the load shifting or demand reduction would be feasible, cost-effective, and reliable.(3)In identifying the programs, rate designs, or other incentives pursuant to paragraph (1), the commission shall consider all of the following goals:(A)Improving capacity utilization and expanding the effective capacity of the constrained distribution area.(B)Establishing an efficient process for large electrical corporations to develop, or to acquire from third parties, load-shifting capacity in a constrained distribution area.(C)Incentives and sufficiently long minimum contract periods to encourage distributed resource participation.(D)Establishing a customer consent-based process for up-front and ongoing access to customer data that, at minimum, meets the provisions outlined in Section 8380, protects customer privacy, and is secure, consistent, not overly burdensome, and sufficient to identify eligible sites and operate in response to dispatch or economic signals.(E)Allowing participation by all customer classes and by both bundled and unbundled customers.(4)The commission shall ensure that programs operated by, or investments made by, large electrical corporations for load-shifting capacity do not prevent or unfairly disadvantage third parties in developing load-shifting capacity that can be offered to other load-serving entities or to wholesale energy markets and do not prevent or unfairly disadvantage other load-serving entities from developing, procuring, or utilizing load-shifting capacity within the same distribution service territory, including by requiring large electrical corporations to provide transparent and timely information needed by third parties to achieve these goals.(d)In support of the strategy developed pursuant to subdivision (a), the commission may do both of the following:(1)Authorize large electrical corporations to make cost-effective investments in load-shifting capacity in a constrained distribution area, subject to the limitation in paragraph (4) of subdivision (c), that include the ability for the large electrical corporation to control the timing of the use of the load-shifting capacity, through direct investments in distributed resources, through contracts for load-shifting capacity, or through tariffs that are open to participation by qualifying resources.(2)Authorize large electrical corporations to develop tariffs or fee structures to charge a large new load seeking energization for the cost of acquiring load-shifting capacity or other peak load reductions from other customers in order to allow or accelerate the energization of that large new load.(e)The commission shall require each large electrical corporation to provide relevant distribution planning data, including metrics developed under this section, to the Energy Commission, and to consult with the Energy Commission to support alignment between distribution-level planning and the Energy Commissions systemwide forecasting and planning.(f)For purposes of this section, all of the following definitions apply:(1)Constrained distribution area means a segment of the distribution grid where capacity limits are already delaying, or are anticipated to delay, energization of new loads as identified by low load-hosting capacity or by locational net benefits analysis, or a similar successor metric, as determined by the commission.(2)Distributed resources has the same meaning as defined in Section 769.(3)Large electrical corporation has the same meaning as defined in Section 2827.(4)Load shifting has the same meaning as defined in Section 25302.7 of the Public Resources Code.SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.(a)The Legislature finds and declares all of the following:
(1)To ensure reliability, the electrical grid must be sized to handle the highest anticipated loads over a multiyear period. As a result, new investment in the electrical grid is often driven by the need to support those peak loads.
(2)Outside of peak load hours, the electrical grid has significant spare capacity. According to the Independent System Operators (CAISO) 2023 Annual Report on Market Issues & Performance, average system load was only about 46 percent of the peak system load during 201923.
(3)According to a 2025 report from Duke Universitys Nicholas Institute for Energy, Environment & Sustainability entitled Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems, the CAISO grid could support an additional 5,900 megawatts of load, approximately 10 percent of the systems highest ever load, outside of the 1 percent of hours with the highest load annually.
(4)The State Energy Resources Conservation and Development Commission (Energy Commission), in its SB 846 Load Shift Load-Shift Goal Commission Report (2023), estimated that the state could achieve 7,000 megawatts of load shifting by 2030.
(5)Many sources of potential load flexibility already exist, including customer-sited energy storage and the ability to adjust the timing of smart thermostats and water heaters, electric vehicle charging, and pumping loads.
(6)Using that load flexibility to reduce peak load is could be a cost-saving opportunity that can reward consumers who provide that load flexibility and can reduce rates for the benefit of all utility customers. An April 2024 study by The Brattle Group entitled Californias Virtual Power Potential: How Five Consumer Technologies Could Improve the States Energy Affordability found that load flexibility could save California consumers five hundred fifty million dollars ($550,000,000) per year by 2035 in reduced costs for traditional generation facilities.
(7)Fleets of distributed resources that are operated automatically to provide load flexibility can often be built and interconnected to the electrical grid more quickly than large-scale infrastructure projects.
(8)Load flexibility can also reduce peak loads in a way that increases the available capacity to serve new customers on the distribution grid, which can accelerate energization of new housing, electric vehicle charging loads, data centers, and other sources of economic growth. growth, provided the distribution utility can control the timing of the load flexibility in order to serve distribution grid needs and can rely on the load flexibility when forecasting future needs during its distribution planning process.
(9)However, today there are few effective programs or incentives targeted at developing load flexibility for purposes of to encourage the load flexibility, which may be developed primarily to address systemwide needs, to be sited and controlled so that local distribution grid benefits, such as reducing local distribution grid peaks and increasing the use of existing distribution assets. assets, can also be realized as cobenefits.
(10)Creating a strategy to leverage demand encourage load flexibility to be sited and controlled to support flexibility at the distribution level should be a priority in order could enable cost-effective ways to accelerate support for new customers while getting the most value out of electrical grid assets that ratepayers have already paid for and minimizing the total new investment required to support anticipated long-term electricity demand growth.
(b)It is the intent of the Legislature to support efforts by the Energy Commission, the Public Utilities Commission, load-serving entities, and local publicly owned electric utilities to leverage cost-effective load flexibility to serve growing electricity demand in the most affordable way possible. possible, and to apply lessons learned from past efforts at these entities, rather than recreating past programs with unclear ratepayer, participant, and electrical grid benefits.
SEC. 2.Section 25302.7 of the Public Resources Code is amended to read:25302.7.(a)(1)By June 1, 2023, the commission, in consultation with the Public Utilities Commission and the Independent System Operator, shall adopt a goal for load shifting to reduce net peak electrical demand and shall adjust this target in each biennial integrated energy policy report prepared pursuant to Section 25302 thereafter. In developing this target, the commission shall consider the findings of the 2020 Lawrence Berkeley National Laboratory report on the Shift Resource through 2030 and other relevant research. The commission, in consultation with the Public Utilities Commission, the Independent System Operator, and other California balancing authorities, shall recommend policies to increase demand response and load shifting that do not increase greenhouse gas emissions or increase electricity rates.
(2)In the next update to the biennial integrated energy policy report prepared pursuant to Section 25302 after January 1, 2027, the commission, in consultation with the Public Utilities Commission, the Independent System Operator, and other California balancing authorities, shall analyze the cost-effectiveness of specific load flexibility resources and programs and identify both the approximate value each load-shifting intervention identified in the report published pursuant to paragraph (1) contributes to the overall 2030 load-shift goal and the cost-effectiveness of each intervention and the cost-effectiveness of the specific resources and programs contributing to that intervention.
(b)(1)As part of each integrated energy policy report adopted pursuant to Section 25302, the commission shall divide the load shifting needed to reach the load-shifting goal adopted pursuant to subdivision (a), including biennial adjustments to the goal, across retail suppliers based on the commissions estimate of each retail suppliers load-shifting potential, including consideration of the relative share of statewide load of each retail supplier, the limitations in each retail suppliers service territory to adopting load-shifting strategies, the cost-effectiveness of load-shifting resources and programs, and other relevant factors, as determined by the commission.
(2)In dividing estimating the load shifting load-shifting potential pursuant to paragraph (1), the commission shall exclude the load shifting expected to be met by emergency programs, including the Demand Side Grid Support Program (Article 3 (commencing with Section 25792) of Chapter 8.9) and the Emergency Load Reduction Program established by the Public Utilities Commission in Decision 21-03-056 (March 25, 2021), Decision Directing Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company to Take Actions to Prepare for Potential Extreme Weather in the Summers of 2021 and 2022.
(c)(1)On or before July 1, 2028, and biennially thereafter, the commission shall analyze and publish, on its internet website, the amount of load shifting that each retail supplier achieved in the prior calendar year, and the amount of load shifting that each retail supplier is aiming to achieve in future years based on its most recent integrated resource plan and other relevant data, as determined by the commission, in comparison to the load-shifting potential estimated for each retail supplier pursuant to subdivision (b).
(2)In support of the analysis pursuant to paragraph (1), the commission shall establish standards for estimating the amount of load shifting that has been, or will be, achieved by each type of load flexibility effort that retail suppliers undertake. These standards shall be periodically updated as the commission learns more about the impact of load-shifting strategies.
(d)The commission, in consultation with the Public Utilities Commission, the Independent System Operator, and other California balancing authorities, shall identify and evaluate barriers to effectively implementing load-shifting strategies, including the ability to qualify for or reduce resource adequacy obligations, and cost-effectiveness of programs and resources and limitations in a retail sellers ability to effectuate programs. The commission shall recommend to the Legislature methods to eliminate or reduce those barriers in each biennial integrated energy policy report prepared pursuant to Section 25302.
(e)(1)This section does not impose a binding obligation or otherwise mandate the procurement of load-shifting technologies by retail suppliers.
(2)This section is not intended to abridge or otherwise supplant the authority of the governing boards of community choice aggregators or local publicly owned electric utilities to set rates, establish programs, and create goals.
(f)For purposes of this section, all of the following definitions apply:
(1)California balancing authority has the same meaning as defined in Section 399.12 of the Public Utilities Code.
(2)Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code.
(3)Electric service provider has the same meaning as defined in Section 218.3 of the Public Utilities Code.
(4)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(5)(A)Load shifting means a reduction in aggregate demand that benefits the electrical grid, including by reducing the need for peak generation capacity and investments in transmission or distribution infrastructure.
(B)Load shifting may include either of the following:
(i)Load-modifying resources, including the use of time-varying rates to induce load flexibility and the use of demand flexibility resources, distribution-connected renewable generation and energy storage resources, or other programs to alter a retail suppliers load forecast.
(ii)Supply-side load flexibility resources, including resources that provide resource adequacy and other demand response resources.
(C)Load shifting does not include the use of backup generators, or any other greenhouse-gas-emitting resources, to reduce electrical grid demand.
(6)Local publicly owned electric utility has the same meaning as defined in Section 224.3 of the Public Utilities Code.
(7)Retail supplier means an electrical corporation, community choice aggregator, electric service provider, or local publicly owned electric utility. Retail supplier does not include an electrical corporation with 60,000 or fewer customer accounts in the state or a retail supplier with an annual electrical demand of less than 1,000 gigawatthours.
SEC. 3.Section 769.1 is added to the Public Utilities Code, to read:769.1.(a)(1)On or before January 1, 2028, the commission shall develop a strategy to reduce the total distribution infrastructure investments required to meet long-term electricity load growth by enabling large electrical corporations to leverage leverage, where cost-effective, distributed resources and load-shifting load shifting to increase the utilization of existing distribution and transmission infrastructure, increase the effective load-hosting capacity of existing distribution and transmission infrastructure, or provide bridging solutions to enable faster energization of new loads, and reduce the total distribution infrastructure investment required to meet long-term electricity load growth. loads.
(2)The strategy developed pursuant to paragraph (1) shall be fully consistent with Section 399.2.
(b)In support of the strategy developed pursuant to subdivision (a), the commission shall require each large electrical corporation, as part of their integration capacity analysis data or a successor policy, to make data available to the public that quantifies the potential for increased utilization of segments of its distribution grid by reducing peak load, including all of the following:
(1)A capacity utilization metric that measures the total energy delivered over a distribution segment during a period of time divided by the maximum energy that could have been delivered according to that distribution segments maximum capacity.
(2)An off-peak load-hosting capacity metric that estimates the capacity of a distribution segment to support new loads outside of the 1 percent of hours with the highest peak load annually for that distribution segment, or data providing a similar quantification of off-peak capacity, as determined by the commission.
(3)The location and boundaries of constrained distribution areas with sufficient detail to allow third parties to identify customer locations where distributed resources could benefit the constrained distribution area.
(c)(1)In support of the strategy developed pursuant to subdivision (a), the commission shall direct each large electrical corporation to implement programs, rate designs, or other incentives identified by the commission to prioritize and encourage enable the development of cost-effective load-shifting capacity or other peak demand reduction in constrained distribution areas, especially where the metrics required under subdivision (b) indicate significant opportunity for peak demand reduction to increase the available load-hosting capacity of that segment of the distribution grid.
(2)Each large electrical corporation shall consider available load-shifting capacity or other peak demand reduction in its annual distribution system planning. The large electrical corporation shall rely on this capacity or demand reduction in its distribution system planning if both of the following conditions are met:
(A)The large electrical corporation can control the timing of the use of the load-shifting capacity or demand reduction for meeting distribution grid needs.
(B)Creating and relying on the load shifting or demand reduction would be feasible, cost-effective, and reliable.
(2)(3)In identifying the programs, rate designs, or other incentives pursuant to paragraph (1), the commission shall prioritize consider all of the following goals:
(A)Improving capacity utilization and expanding the effective capacity of the constrained distribution area before specific electrical grid upgrade needs have been identified, rather than considering distributed resources for deferring electrical grid upgrades only after specific electrical grid upgrade needs are identified. area.
(B)Establishing an efficient process for large electrical corporations to acquire, and for develop, or to acquire from third parties to offer, parties, load-shifting capacity in a constrained distribution area.
(C)Accommodating the need for locational and temporal specificity while not creating undue complexity in implementation.(D)Providing adequate incentives(C)Incentives and a sufficiently long minimum contract period for the use and compensation of periods to encourage distributed resources to encourage investment. resource participation.
(E)(D)Establishing a customer consent-based process for up-front and ongoing access to customer data that that, at minimum, meets the provisions outlined in Section 8380, protects customer privacy, and is secure, consistent, not overly burdensome, and sufficient to identify eligible sites and operate in response to dispatch or economic signals.
(F)(E)Allowing participation by all customer classes and by both bundled and unbundled customers.
(3)(4)The commission shall ensure that programs operated by, or investments made by, large electrical corporations for load-shifting capacity do not interfere with the ability of prevent or unfairly disadvantage third parties to develop in developing load-shifting capacity that can be offered to other load-serving entities or to wholesale energy markets and do not restrict prevent or unfairly disadvantage other load-serving entities from developing, procuring, or utilizing load-shifting capacity within the same distribution service territory, including by requiring large electrical corporations to provide transparent and timely information needed by third parties to achieve these goals.
(4)The commission shall consider how, and under what conditions, the same distributed resources can provide load flexibility for, and be compensated for, meeting both distribution grid needs and load modification or resource adequacy needs, including when those load flexibility services are being provided to different load-serving entities.(d)In support of the strategy developed pursuant to subdivision (a), the commission may do both of the following:
(1)Authorize large electrical corporations to make cost-effective investments in load-shifting capacity in a constrained distribution area, subject to the limitation in paragraph (3) (4) of subdivision (c), that include the ability for the large electrical corporation to control the timing of the use of the load-shifting capacity, through direct investments in distributed resources, through contracts for load-shifting capacity, or through tariffs that are open to participation by qualifying resources.
(2)Authorize large electrical corporations to develop tariffs or fee structures to charge a large new load seeking energization for the cost of acquiring load-shifting capacity or other peak load reductions from other customers in order to allow or accelerate the energization of that large new load.
(e)Before determining that an investment by a large electrical corporation to increase distribution system capacity is just and reasonable, the commission shall ensure that the large electrical corporation has made reasonable efforts to increase cost-effective load shifting or other types of peak demand reduction in order to expand the effective capacity and increase the utilization of that segment of the distribution grid, including consideration of the data required pursuant to subdivision (b) and the large electrical corporations progress in implementing the programs, rate designs, or other incentives identified by the commission pursuant to subdivision (c).(f)(e)The commission shall require each large electrical corporation to provide relevant distribution planning data, including metrics developed under this section, to the Energy Commission, and to consult with the Energy Commission to support alignment between distribution-level planning and the Energy Commissions systemwide forecasting and planning.
(g)(f)For purposes of this section, all of the following definitions apply:
(1)Constrained distribution area means a segment of the distribution grid where capacity limits are already delaying, or are anticipated to delay, energization of new loads as identified by low load-hosting capacity or by locational net benefits analysis, or a similar successor metric, as determined by the commission.
(2)Distributed resources has the same meaning as defined in Section 769.
(3)Large electrical corporation has the same meaning as defined in Section 2827.
(4)Load shifting has the same meaning as defined in Section 25302.7 of the Public Resources Code.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)To ensure reliability, the electrical grid must be sized to handle the highest anticipated loads over a multiyear period. As a result, new investment in the electrical grid is often driven by the need to support those peak loads.
(2)Outside of peak load hours, the electrical grid has significant spare capacity. According to the Independent System Operators (CAISO) 2023 Annual Report on Market Issues & Performance, average system load was only about 46 percent of the peak system load during 201923.
(3)According to a 2025 report from Duke Universitys Nicholas Institute for Energy, Environment & Sustainability entitled Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems, the CAISO grid could support an additional 5,900 megawatts of load, approximately 10 percent of the systems highest ever load, outside of the 1 percent of hours with the highest load annually.
(4)The State Energy Resources Conservation and Development Commission (Energy Commission), in its SB 846 Load Shift Goal Commission Report (2023), estimated that the state could achieve 7,000 megawatts of load shifting by 2030.
(5)Many sources of potential load flexibility already exist, including customer-sited energy storage and the ability to adjust the timing of smart thermostats and water heaters, electric vehicle charging, and pumping loads.
(6)Using that load flexibility to reduce peak load is a cost-saving opportunity that can reward consumers who provide that load flexibility and can reduce rates for the benefit of all utility customers. An April 2024 study by The Brattle Group entitled Californias Virtual Power Potential: How Five Consumer Technologies Could Improve the States Energy Affordability found that load flexibility could save California consumers five hundred fifty million dollars ($550,000,000) per year by 2035 in reduced costs for traditional generation facilities.
(7)Fleets of distributed resources that are operated automatically to provide load flexibility can often be built and interconnected to the electrical grid more quickly than large-scale infrastructure projects.
(8)Load flexibility can also reduce peak loads in a way that increases the available capacity to serve new customers on the distribution grid, which can accelerate energization of new housing, electric vehicle charging loads, data centers, and other sources of economic growth.
(9)However, today there are few effective programs or incentives targeted at developing load flexibility for purposes of reducing local distribution grid peaks and increasing the use of existing distribution assets.
(10)Creating a strategy to leverage demand flexibility at the distribution level should be a priority in order to accelerate support for new customers while getting the most value out of electrical grid assets that ratepayers have already paid for and minimizing the total new investment required to support anticipated long-term electricity demand growth.
(b)It is the intent of the Legislature to support efforts by the Energy Commission, the Public Utilities Commission, load-serving entities, and local publicly owned electric utilities to leverage cost-effective load flexibility to serve growing electricity demand in the most affordable way possible.
SECTION 1.SEC. 2.Section 25302.7 of the Public Resources Code is amended to read:25302.7.(a)By June 1, 2023, the commission, in consultation with the Public Utilities Commission and the Independent System Operator, shall adopt a goal for load shifting to reduce net peak electrical demand and shall adjust this target in each biennial integrated energy policy report prepared pursuant to Section 25302 thereafter. In developing this target, the commission shall consider the findings of the 2020 Lawrence Berkeley National Laboratory report on the Shift Resource through 2030 and other relevant research. The commission, in consultation with the Public Utilities Commission and Commission, the Independent System Operator, and other California balancing authorities, shall recommend policies to increase demand response and load shifting that do not increase greenhouse gas emissions or increase electricity rates.
(b)(1)As part of each integrated energy policy report adopted pursuant to Section 25302, the commission shall allocate divide the load shifting needed to reach the load-shifting goal adopted pursuant to subdivision (a), including biennial adjustments to the goal, to each across retail supplier suppliers based on the commissions estimate of its each retail suppliers load-shifting potential, including consideration of the relative share of statewide load of each retail supplier, and other relevant factors, as determined by the commission.
(2)In allocating dividing the load shifting pursuant to paragraph (1), the commission shall exclude the load shifting expected to be met by emergency programs, including the Demand Side Grid Support Program (Article 3 (commencing with Section 25792) of Chapter 8.9) and the Emergency Load Reduction Program established by the Public Utilities Commission in Decision 21-03-056 (March 25, 2021), Decision Directing Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company to Take Actions to Prepare for Potential Extreme Weather in the Summers of 2021 and 2022.
(c)(1)On or before July 1, 2028, and biennially thereafter, the commission shall evaluate analyze and publish, on its internet website, the amount of load shifting that each retail supplier achieved in the prior calendar year, and the amount of load shifting that each retail supplier is expected aiming to achieve in future years based on its most recent integrated resource plan and other relevant data, as determined by the commission, in comparison to the load shifting allocated to the load-shifting potential estimated for each retail supplier pursuant to subdivision (b). In making this evaluation, the commission shall do both of the following:
(1)Establish(2)In support of the analysis pursuant to paragraph (1), the commission shall establish standards for evaluating the effectiveness of each load-shifting strategy for the purpose of estimating the amount of load shifting that has been, or will be, achieved by each type of load flexibility effort that each retail supplier undertakes. suppliers undertake. These standards shall be periodically updated as the commission learns more about the effectiveness impact of load-shifting strategies.
(2)Allocate to each retail supplier its share of credit for nonemergency load shifting that is procured or obtained through a centralized procurement mechanism, broadly applicable rate design program, or other collective activity for the purpose of including that load shifting in the retail suppliers progress toward meeting the allocation established pursuant to subdivision (b).(d)The commission, in consultation with the Public Utilities Commission and Commission, the Independent System Operator, and other California balancing authorities, shall do both of the following:
(1)Identify identify and evaluate barriers to effectively implementing load-shifting strategies, including the ability to qualify for or reduce resource adequacy obligations, and recommend to the Legislature methods to eliminate or reduce those barriers in each biennial integrated energy policy report prepared pursuant to Section 25302.
(2)Establish a location-based avoided cost metric that estimates the value of demand reduction at different times and locations, including, but not limited to, the benefits from reducing or delaying the need for future investment in transmission or distribution infrastructure and from avoided resource adequacy costs, and require electrical corporations to continuously update these location-based avoided cost metrics and make them available to third parties to encourage investment in load flexibility in locations and for time periods where it would provide the largest electrical grid benefits.(e)(1)This section does not impose a binding obligation or otherwise mandate the procurement of load-shifting technologies by retail suppliers.
(2)This section is not intended to abridge or otherwise supplant the authority of the governing boards of community choice aggregators or local publicly owned electric utilities to set rates, establish programs, and create goals.
(e)(f)For purposes of this section, all of the following definitions apply:
(1)California balancing authority has the same meaning as defined in Section 399.12 of the Public Utilities Code.
(1)(2)Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code.
(2)(3)Electric service provider has the same meaning as defined in Section 218.3 of the Public Utilities Code.
(3)(4)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(4)(5)(A)Load shifting means a reduction in aggregate demand that benefits the electrical grid, including by reducing the need for peak generation capacity and investments in transmission or distribution infrastructure.
(B)Load shifting may include either of the following:
(i)Load-modifying resources, including the use of time-varying rates to induce load flexibility and the use of demand flexibility resources resources, distribution-connected renewable generation and energy storage resources, or other programs to alter an entitys a retail suppliers load forecast and the use of time-varying rates to induce load flexibility. forecast.
(ii)Supply-side load flexibility resources, including resources that provide resource adequacy and other demand response resources.
(C)Load shifting may does not include the use of backup generators, or any other greenhouse-gas-emitting resources, only within emergency programs. resources, to reduce electrical grid demand.
(5)(6)Local publicly owned electric utility has the same meaning as defined in Section 224.3 of the Public Utilities Code.
(6)(7)Retail supplier means an electrical corporation, community choice aggregator, electric service provider, or local publicly owned electric utility. Retail supplier does not include an electrical corporation with 60,000 or fewer customer accounts in the state or a retail supplier with an annual electrical demand of less than 1,000 gigawatthours.
SEC. 3.Section 769.1 is added to the Public Utilities Code, to read:769.1.(a)On or before January 1, 2028, the commission shall develop a strategy to leverage distributed resources and load-shifting to increase the utilization of existing distribution and transmission infrastructure, increase the effective load-hosting capacity of existing distribution and transmission infrastructure, provide bridging solutions to enable faster energization of new loads, and reduce the total distribution infrastructure investment required to meet long-term electricity load growth.
(b)In support of the strategy developed pursuant to subdivision (a), the commission shall require each large electrical corporation, as part of their integration capacity analysis data or a successor policy, to make data available to the public that quantifies the potential for increased utilization of segments of its distribution grid by reducing peak load, including all of the following:
(1)A capacity utilization metric that measures the total energy delivered over a distribution segment during a period of time divided by the maximum energy that could have been delivered according to that distribution segments maximum capacity.
(2)An off-peak load-hosting capacity metric that estimates the capacity of a distribution segment to support new loads outside of the 1 percent of hours with the highest peak load annually for that distribution segment, or data providing a similar quantification of off-peak capacity, as determined by the commission.
(3)The location and boundaries of constrained distribution areas with sufficient detail to allow third parties to identify customer locations where distributed resources could benefit the constrained distribution area.
(c)(1)In support of the strategy developed pursuant to subdivision (a), the commission shall direct each large electrical corporation to implement programs, rate designs, or other incentives identified by the commission to prioritize and encourage the development of load-shifting capacity or other peak demand reduction in constrained distribution areas, especially where the metrics required under subdivision (b) indicate significant opportunity for peak demand reduction to increase the available load-hosting capacity of that segment of the distribution grid.
(2)In identifying the programs, rate designs, or other incentives pursuant to paragraph (1), the commission shall prioritize all of the following goals:
(A)Improving capacity utilization and expanding the effective capacity of the constrained distribution area before specific electrical grid upgrade needs have been identified, rather than considering distributed resources for deferring electrical grid upgrades only after specific electrical grid upgrade needs are identified.
(B)Establishing an efficient process for large electrical corporations to acquire, and for third parties to offer, load-shifting capacity in a constrained distribution area.
(C)Accommodating the need for locational and temporal specificity while not creating undue complexity in implementation.
(D)Providing adequate incentives and a sufficiently long minimum contract period for the use and compensation of distributed resources to encourage investment.
(E)Establishing a customer consent-based process for up-front and ongoing access to customer data that is secure, consistent, not overly burdensome, and sufficient to identify eligible sites and operate in response to dispatch or economic signals.
(F)Allowing participation by all customer classes and by both bundled and unbundled customers.
(3)The commission shall ensure that programs operated by, or investments made by, large electrical corporations for load-shifting capacity do not interfere with the ability of third parties to develop load-shifting capacity that can be offered to other load-serving entities or to wholesale energy markets and do not restrict or disadvantage other load-serving entities from developing, procuring, or utilizing load-shifting capacity within the same distribution service territory, including by requiring large electrical corporations to provide transparent and timely information needed by third parties to achieve these goals.
(4)The commission shall consider how, and under what conditions, the same distributed resources can provide load flexibility for, and be compensated for, meeting both distribution grid needs and load modification or resource adequacy needs, including when those load flexibility services are being provided to different load-serving entities.
(d)In support of the strategy developed pursuant to subdivision (a), the commission may do both of the following:
(1)Authorize large electrical corporations to make investments in load-shifting capacity in a constrained distribution area, subject to the limitation in paragraph (3) of subdivision (c), that include the ability for the large electrical corporation to control the timing of the use of the load-shifting capacity, through direct investments in distributed resources, through contracts for load-shifting capacity, or through tariffs that are open to participation by qualifying resources.
(2)Authorize large electrical corporations to develop tariffs or fee structures to charge a large new load seeking energization for the cost of acquiring load-shifting capacity or other peak load reductions from other customers in order to allow or accelerate the energization of that large new load.
(e)Before determining that an investment by a large electrical corporation to increase distribution system capacity is just and reasonable, the commission shall ensure that the large electrical corporation has made reasonable efforts to increase cost-effective load shifting or other types of peak demand reduction in order to expand the effective capacity and increase the utilization of that segment of the distribution grid, including consideration of the data required pursuant to subdivision (b) and the large electrical corporations progress in implementing the programs, rate designs, or other incentives identified by the commission pursuant to subdivision (c).
(f)The commission shall require each large electrical corporation to provide relevant distribution planning data, including metrics developed under this section, to the Energy Commission, and to consult with the Energy Commission to support alignment between distribution-level planning and the Energy Commissions systemwide forecasting and planning.
(g)For purposes of this section, all of the following definitions apply:
(1)Constrained distribution area means a segment of the distribution grid where capacity limits are already delaying, or are anticipated to delay, energization of new loads as identified by low load-hosting capacity or by locational net benefits analysis, or a similar successor metric, as determined by the commission.
(2)Distributed resources has the same meaning as defined in Section 769.
(3)Large electrical corporation has the same meaning as defined in Section 2827.
(4)Load shifting has the same meaning as defined in Section 25302.7 of the Public Resources Code.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)By June 1, 2023, the commission, in consultation with the Public Utilities Commission and the Independent System Operator, shall adopt a goal for load shifting to reduce net peak electrical demand and shall adjust this target in each biennial integrated energy policy report prepared pursuant to Section 25302 thereafter. In developing this target, the commission shall consider the findings of the 2020 Lawrence Berkeley National Laboratory report on the Shift Resource through 2030 and other relevant research. The commission, in consultation with the Public Utilities Commission and the Independent System Operator, shall recommend policies to increase demand response and load shifting that do not increase greenhouse gas emissions or increase electricity rates.
(b)(1)As part of each integrated energy policy report adopted pursuant to Section 25302, the commission shall allocate the load shifting needed to reach the load-shifting goal adopted pursuant to subdivision (a), including biennial adjustments to the goal, to each retail supplier based on the commissions estimate of its load-shifting potential, including consideration of the relative share of statewide load of each retail supplier, and other relevant factors, as determined by the commission.
(2)In allocating the load shifting pursuant to paragraph (1), the commission shall exclude the load shifting expected to be met by emergency programs, including the Demand Side Grid Support Program (Article 3 (commencing with Section 25792) of Chapter 8.9) and the Emergency Load Reduction Program established by the Public Utilities Commission in Decision 21-03-056 (March 25, 2021), Decision Directing Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company to Take Actions to Prepare for Potential Extreme Weather in the Summers of 2021 and 2022.
(c)On or before July 1, 2028, and biennially thereafter, the commission shall evaluate and publish, on its internet website, the amount of load shifting that each retail supplier achieved in the prior calendar year, and the amount of load shifting that each retail supplier is expected to achieve in future years based on its most recent integrated resource plan and other relevant data, as determined by the commission, in comparison to the load shifting allocated to the retail supplier pursuant to subdivision (b). In making this evaluation, the commission shall do both of the following:
(1)Establish standards for evaluating the effectiveness of each load-shifting strategy for the purpose of estimating the amount of load shifting that has been, or will be, achieved by each type of load flexibility effort that each retail supplier undertakes. These standards shall be periodically updated as the commission learns more about the effectiveness of load-shifting strategies.
(2)Allocate to each retail supplier its share of credit for nonemergency load shifting that is procured or obtained through a centralized procurement mechanism, broadly applicable rate design program, or other collective activity for the purpose of including that load shifting in the retail suppliers progress toward meeting the allocation established pursuant to subdivision (b).
(d)The commission, in consultation with the Public Utilities Commission and the Independent System Operator, shall do both of the following:
(1)Identify and evaluate barriers to effectively implementing load-shifting strategies, including the ability to qualify for or reduce resource adequacy obligations, and recommend to the Legislature methods to eliminate or reduce those barriers in each biennial integrated energy policy report prepared pursuant to Section 25302.
(2)Establish a location-based avoided cost metric that estimates the value of demand reduction at different times and locations, including, but not limited to, the benefits from reducing or delaying the need for future investment in transmission or distribution infrastructure and from avoided resource adequacy costs, and require electrical corporations to continuously update these location-based avoided cost metrics and make them available to third parties to encourage investment in load flexibility in locations and for time periods where it would provide the largest electrical grid benefits.
(e)For purposes of this section, all of the following definitions apply:
(1)Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code.
(2)Electric service provider has the same meaning as defined in Section 218.3 of the Public Utilities Code.
(3)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(4)(A)Load shifting means a reduction in demand that benefits the electrical grid, including by reducing the need for peak generation capacity and investments in transmission or distribution infrastructure.
(B)Load shifting may include either of the following:
(i)Load-modifying resources, including the use of demand flexibility resources or programs to alter an entitys load forecast and the use of time-varying rates to induce load flexibility.
(ii)Supply-side load flexibility resources, including resources that provide resource adequacy and other demand response resources.
(C)Load shifting may include the use of backup generators, or any other greenhouse-gas-emitting resources, only within emergency programs.
(5)Local publicly owned electric utility has the same meaning as defined in Section 224.3 of the Public Utilities Code.
(6)Retail supplier means an electrical corporation, community choice aggregator, electric service provider, or local publicly owned electric utility. Retail supplier does not include an electrical corporation with 60,000 or fewer customer accounts in the state or a retail supplier with an annual electrical demand of less than 1,000 gigawatthours.
SEC. 2.Section 380.4 is added to the Public Utilities Code, to read:380.4.As part of a new or existing proceeding, the commission shall consider both of the following:(a)Whether larger differentials between peak and off-peak time-of-use periods, including larger differentials for the transmission and distribution portion of rates, would be a cost-effective way to address peak load.(b)Whether distinguishing between nighttime off-peak and daytime off-peak periods would be a cost-effective way to align flexible load with periods of abundant renewable and zero-carbon energy.(a)By June 1, 2023, the commission, in consultation with the Public Utilities Commission and the Independent System Operator, shall adopt a goal for load shifting to reduce net peak electrical demand and shall adjust this target in each biennial integrated energy policy report prepared pursuant to Section 25302 thereafter. In developing this target, the commission shall consider the findings of the 2020 Lawrence Berkeley National Laboratory report on the Shift Resource through 2030 and other relevant research. The commission, in consultation with the Public Utilities Commission and the Independent System Operator, shall recommend policies to increase demand response and load shifting that do not increase greenhouse gas emissions or increase electric electricity rates.
(b)(1)As part of each integrated energy policy report adopted pursuant to Section 25302, the commission shall allocate the incremental load shifting needed to reach the load-shifting goal adopted pursuant to subdivision (a), including biennial adjustments to the goal, to each retail supplier based on the commissions estimate of its load-shifting potential, including consideration of the relative share of statewide load of each retail supplier. In allocating the incremental load-shifting goal, the commission shall do all the following: supplier, and other relevant factors, as determined by the commission.
(1)Deduct the load shifting already achieved as identified in the initial load-shifting goal adopted by the commission in the commissions Senate Bill 846 Load-Shift Goal Report, CEC-200-2023-008 (May 26, 2023).(2)Consider the shortened time remaining to achieve the incremental load shifting needed to reach the 2030 goal.(3)Exclude from the incremental load-shifting goal(2)In allocating the load shifting pursuant to paragraph (1), the commission shall exclude the load shifting expected to be met by emergency programs, including the Demand Side Grid Support Program (Article 3 (commencing with Section 25792) of Chapter 8.9) and the Emergency Load Reduction Program established by the Public Utilities Commission in Decision 21-03-056 (March 25, 2021), Decision Directing Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company to Take Actions to Prepare for Potential Extreme Weather in the Summers of 2021 and 2022.
(4)Consider nonemergency load shifting already achieved by a retail supplier.(c)(1)The commission shall establish rules for evaluating the effectiveness of the various load-shifting strategies for the purpose of determining how much credit a retail supplier should get for each type of load flexibility effort it undertakes. These rules shall be periodically updated as the commission learns more about the effectiveness of the various load-shifting strategies.(2)The commission shall periodically identify and evaluate barriers to effectively implementing load-shifting strategies and shall recommend to the Legislature methods to eliminate or reduce those barriers.(c)On or before July 1, 2028, and biennially thereafter, the commission shall evaluate and publish, on its internet website, the amount of load shifting that each retail supplier achieved in the prior calendar year, and the amount of load shifting that each retail supplier is expected to achieve in future years based on its most recent integrated resource plan and other relevant data, as determined by the commission, in comparison to the load shifting allocated to the retail supplier pursuant to subdivision (b). In making this evaluation, the commission shall do both of the following:
(1)Establish standards for evaluating the effectiveness of each load-shifting strategy for the purpose of estimating the amount of load shifting that has been, or will be, achieved by each type of load flexibility effort that each retail supplier undertakes. These standards shall be periodically updated as the commission learns more about the effectiveness of load-shifting strategies.
(2)Allocate to each retail supplier its share of credit for nonemergency load shifting that is procured or obtained through a centralized procurement mechanism, broadly applicable rate design program, or other collective activity for the purpose of including that load shifting in the retail suppliers progress toward meeting the allocation established pursuant to subdivision (b).
(d)The commission, in consultation with the Public Utilities Commission and the Independent System Operator, shall do both of the following:
(1)Identify and evaluate barriers to effectively implementing load-shifting strategies, including the ability to qualify for or reduce resource adequacy obligations, and recommend to the Legislature methods to eliminate or reduce those barriers in each biennial integrated energy policy report prepared pursuant to Section 25302.
(2)Establish a location-based avoided cost metric that estimates the value of demand reduction at different times and locations, including, but not limited to, the benefits from reducing or delaying the need for future investment in transmission or distribution infrastructure and from avoided resource adequacy costs, and require electrical corporations to continuously update these location-based avoided cost metrics and make them available to third parties to encourage investment in load flexibility in locations and for time periods where it would provide the largest electrical grid benefits.
(d)(e)For purposes of this section, all of the following definitions apply:
(1)Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code.
(2)Electric service provider has the same meaning as defined in Section 218.3 of the Public Utilities Code.
(3)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(4)(A)Load shifting means a reduction in net peak demand during the top 100 net system load hours in a year, with net system load measured as gross bulk system load minus in-front-of-the-meter solar and wind generation. that benefits the electrical grid, including by reducing the need for peak generation capacity and investments in transmission or distribution infrastructure.
(B)Load shifting may include either of the following:
(i)Load-modifying resources, including the use of demand flexibility resources or programs to alter an entitys load forecast and the use of time-varying rates to induce load flexibility.
(ii)Supply-side load flexibility resources, including resources that provide resource adequacy and other nonemergency demand response resources.
(C)Load shifting may include the use of backup generators, or any other greenhouse-gas-emitting resources, only within emergency programs.
(5)Local publicly owned electric utility has the same meaning as defined in Section 224.3 of the Public Utilities Code.
(6)Retail supplier means an electrical corporation, community choice aggregator, electric service provider, or local publicly owned electric utility. Retail supplier does not include an electrical corporation with 60,000 or fewer customer accounts in the state or a retail supplier with an annual electrical demand of less than 1,000 gigawatthours.
SEC. 2.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity to file an integrated resource plan, and a schedule for periodic updates to the plan, and shall ensure that load-serving entities do all of the following:(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions pursuant to Section 38566 of the Health and Safety Code.(B)Procure at least 60 percent eligible renewable energy resources by December 31, 2030, consistent with the state policy specified in Section 454.53 and Article 16 (commencing with Section 399.11) of Chapter 2.3.(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.(D)Minimize impacts on ratepayers bills.(E)(i)Ensure system and local reliability on a short-term, midterm, and long-term basis, including meeting the short-term and forecast long-term resource adequacy requirements of Section 380, and require sufficient, predictable resource procurement and development to avoid unplanned energy supply shortfalls by taking into account impacts due to climate change, forecasted levels of building and transportation electrification, and other factors that can result in those shortfalls.(ii)In furtherance of avoiding unplanned energy supply shortfalls or expensive emergency procurement and ensuring a more accurate understanding of electrical grid operational needs, the commission shall aggregate reported short-term and midterm resource procurement from all load-serving entities conducted under Section 380 or this section and assess midterm resource sufficiency, and annually provide anonymized reports to the Independent System Operator. The commission shall report forward resource procurement using counting conventions that provide the data to the Independent System Operator to be used in its grid planning.(iii)To accomplish clause (i), the commission shall, as part of the integrated planning process, assess short-term, midterm, and long-term reliability by conducting probabilistic reliability modeling, including if there is sufficient capacity available for procurement in the short term and midterm by all load-serving entities to meet their procurement requirements. The commission shall review the results of that reliability modeling in a public proceeding at the same frequency as the forecast conducted in accordance with this section. When modeling short-term and midterm reliability, the commission shall model all procurement consistent with clause (ii) and may rely upon or incorporate probabilistic reliability modeling conducted by the Energy Commission into the commissions public process. The commission shall also report the modeling results in the joint Reliability Planning Assessments conducted under Section 25233 of the Public Resources Code.(F)Comply with paragraph (1) of subdivision (b) of Section 399.13.(G)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.(H)(i)In addition to, and separate from, the other requirements of this section, meet the incremental load-shifting allocation established in subdivision (b) of Section 25302.7 of the Public Resources Code, to the extent that the allocation is cost effective, as measured by the avoided cost calculator or in comparison to the cost of alternative sources of resource adequacy.(ii)Each load-serving entity shall be allocated its share of credit for nonemergency load-shifting strategies that are procured or obtained by any centralized procurement mechanism, broadly applicable rate design program, or other collective activity for the purpose of including that load shifting in its plan.(iii)A plan that does not forecast meeting its incremental load-shifting goal shall explain and document why it cannot be met cost-effectively or is otherwise unachievable and demonstrate that it is more cost effective to acquire incremental net peak capacity.(I)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.(J)Maintain a diverse portfolio of energy resources, which may include eligible energy resources procured by the Department of Water Resources.(2)(A)The commission may authorize all source procurement for load-serving entities that includes various resource types including demand-side resources, supply-side resources, and resources that may be either demand-side resources or supply-side resources, taking into account the differing load-serving entities geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).(B)The commission may approve procurement of resource types that will reduce the overall emissions of greenhouse gases from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.(4)(A)On or before September 1, 2024, and consistent with the process and schedule adopted pursuant to paragraph (1), the commission, in consultation with the Energy Commission and the Independent System Operator, shall determine if there is a need for the procurement of eligible energy resources based on a review of the integrated resource plans submitted by load-serving entities in compliance with the requirements of this section and Section 454.53 and the progress towards meeting the portfolio of resources identified pursuant to subdivision (a) of Section 454.51.(B)If the commission determines that there is a need for the procurement of eligible energy resources, the commission shall specify the eligible energy resources that should be procured to meet that need.(C)Within six months of determining that there is a need for the procurement of eligible energy resources, the commission may request the Department of Water Resources to exercise its central procurement function to procure those eligible energy resources specified pursuant to subparagraph (B) that meet the portfolio of resources identified in subdivision (a) of Section 454.51.(D)(i)Upon receiving a request pursuant to subparagraph (C), the Department of Water Resources, before January 1, 2035, may exercise its central procurement function to conduct one or more competitive solicitations and enter into contracts to procure eligible energy resources in order to achieve the policy of the state specified in Section 454.53.(ii)Any contract entered into by the Department of Water Resources pursuant to clause (i) and approved by the commission pursuant to Section 80821 of the Water Code before January 1, 2035, shall remain in force for the duration of the contract.(E)The Department of Water Resources exercising of its central procurement function to procure eligible energy resources pursuant to this paragraph shall be conducted in accordance with Division 29.5 (commencing with Section 80800) of the Water Code.(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.(2)Each electrical corporations plan shall follow Section 454.5.(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve all of the following:(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).(B)A diversified procurement portfolio consisting of short-term, midterm, and long-term electricity, electricity-related, and demand reduction products.(C)The resource adequacy requirements established pursuant to Section 380.(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of short-term, midterm, and long-term electricity, electricity-related, and demand reduction products.(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51. The commission may order the procurement of resources with specific attributes by load-serving entities as a result of the integrated resource planning process and shall enforce any resource procurement requirements on a nondiscriminatory basis. Enforcement may include the assessment of penalties for noncompliance.(d)To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.(e)This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined based on a three-year average commencing with January 1, 2013.(f)(1)The commission shall not include the energy, capacity, or any attribute from Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025, in the adopted integrated resource plan portfolios, resource stacks, or preferred system plans.(2)The commission shall disallow a load-serving entity from including in their adopted integrated resource plan any energy, capacity, or any attribute from the Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025.(g)For a thermal powerplant that uses nuclear fission technology not constructed in the twenty-first century, all resource attributes shall be retired on January 1, 2031, and shall be reported as a separate, line item resource for purposes of complying with Section 398.4.(h)(1)Only a new energy resource that meets all of the following requirements is eligible to be procured by the Department of Water Resources pursuant to this section:(A)The resource directly supports attainment of the goals specified in Section 454.53 without increasing the states dependence on any fossil fuel-based resources.(B)The resource is determined by the commission to not be under contract at sufficient levels as shown in load-serving entities most recent individual integrated resource plans submitted to and reviewed by the commission pursuant to this section to achieve the goals specified in Section 454.53.(C)The resource has a construction and development lead time of at least five years.(D)The resource does not generate electricity using fossil fuels or fuels derived from fossil fuels.(E)The resource does not use combustion to generate electricity, unless that combustion use is ancillary and necessary to facilitate geothermal electricity generation.(2)Resources from a pump hydroelectric facility may be procured by the Department of Water Resources pursuant to this section if the pump hydroelectric facility does not exceed 500 megawatts and has been directly appropriated funding by the state before January 1, 2023.(i)For purposes of this section, the following definitions apply:(1)Load-serving entity has the same meaning as defined in Section 380.(2)Long term means a time period that includes five or more years in the future.(3)Midterm means a time period between two and five years in the future.(4)Short term means a time period between the present and two years in the future.SEC. 2.Section 380.4 is added to the Public Utilities Code, to read:380.4.As part of a new or existing proceeding, the commission shall consider both of the following:
(a)Whether larger differentials between peak and off-peak time-of-use periods, including larger differentials for the transmission and distribution portion of rates, would be a cost-effective way to address peak load.
(b)Whether distinguishing between nighttime off-peak and daytime off-peak periods would be a cost-effective way to align flexible load with periods of abundant renewable and zero-carbon energy.
SEC. 3.Chapter 11 (commencing with Section 8500) is added to Division 4.1 of the Public Utilities Code, to read:11.Rates8500.(a)All retail suppliers shall provide rate information to the Energy Commissions Market-Informed Demand Automation Server in order to provide third-party devices with access to real-time rate information for the purpose of efficiently automating load flexibility.(b)On or before January 1, 2028, the commission shall require all load-serving entities to offer optional dynamic pricing tariffs consistent with the Energy Commissions electric load management standards (Article 5 (commencing with Section 1621) of Chapter 4 of Division 2 of Title 20 of the California Code of Regulations) and the commissions California Flexible Unified Signal for Energy (CalFUSE) hourly dynamic pricing framework.(c)(1)On or before January 1, 2028, the governing board of each local publicly owned electric utility shall consider offering dynamic pricing tariffs consistent with the Energy Commissions electric load management standards (Article 5 (commencing with Section 1621) of Chapter 4 of Division 2 of Title 20 of the California Code of Regulations) and the commissions California Flexible Unified Signal for Energy (CalFUSE) hourly dynamic pricing framework.(2)If a governing board does not offer dynamic pricing tariffs, the governing board shall adopt a resolution explaining why the governing board does not believe it would be in the best interest of their ratepayers and post the resolution on its internet website.(d)As part of a new or existing proceeding, the commission shall consider both of the following:(1)Whether larger differentials between peak and off-peak time-of-use periods, including larger differentials for the transmission and distribution portion of rates, would be a cost-effective way to address peak load.(2)Whether distinguishing between nighttime off-peak and daytime off-peak periods would be a cost-effective way to align flexible load with periods of abundant renewable and zero-carbon energy.(e)For purposes of this section, all of the following definitions apply:(1)Community choice aggregator has the same meaning as defined in Section 331.1.(2)Electric service provider has the same meaning as defined in Section 218.3.(3)Electrical corporation has the same meaning as defined in Section 218.(4)Energy Commission means the State Energy Resources Conservation and Development Commission. (5)Load-serving entity has the same meaning as defined in Section 380.(6)Local publicly owned electric utility has the same meaning as defined in Section 224.3.(7)Retail supplier means an electrical corporation, community choice aggregator, electric service provider, or local publicly owned electric utility. Retail supplier does not include electrical corporations with 60,000 or fewer customer accounts in the state or any retail supplier with an annual electrical demand of less than 1,000 gigawatthours.SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.(a)By June 1, 2023, the commission, in consultation with the Public Utilities Commission and the Independent System Operator, shall adopt a goal for load shifting to reduce net peak electrical demand and shall adjust this target in each biennial integrated energy policy report prepared pursuant to Section 25302 thereafter. In developing this target, the commission shall consider the findings of the 2020 Lawrence Berkeley National Laboratory report on the Shift Resource through 2030 and other relevant research. The commission, in consultation with the Public Utilities Commission and the Independent System Operator, shall recommend policies to increase demand response and load shifting that do not increase greenhouse gas emissions or increase electric rates.
(b)As part of each integrated energy policy report adopted pursuant to Section 25302, the commission shall allocate the incremental load shifting needed to reach the load-shifting goal adopted pursuant to subdivision (a), including biennial adjustments to the goal, to each retail supplier based on the relative share of statewide load of each retail supplier. In allocating the incremental load-shifting goal, the commission shall do all the following:
(1)Deduct the load shifting already achieved as identified in the initial load-shifting goal adopted by the commission in the commissions Senate Bill 846 Load-Shift Goal Report, CEC-200-2023-008 (May 26, 2023).
(2)Consider the shortened time remaining to achieve the incremental load shifting needed to reach the 2030 goal.
(3)Exclude from the incremental load-shifting goal the load shifting expected to be met by emergency programs, including the Demand Side Grid Support Program (Article 3 (commencing with Section 25792) of Chapter 8.9) and the Emergency Load Reduction Program established by the Public Utilities Commission in Decision 21-03-056 (March 25, 2021), Decision Directing Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company to Take Actions to Prepare for Potential Extreme Weather in the Summers of 2021 and 2022.
(4)Consider nonemergency load shifting already achieved by a retail supplier.
(c)(1)The commission shall establish rules for evaluating the effectiveness of the various load-shifting strategies for the purpose of determining how much credit a retail supplier should get for each type of load flexibility effort it undertakes. These rules shall be periodically updated as the commission learns more about the effectiveness of the various load-shifting strategies.
(2)The commission shall periodically identify and evaluate barriers to effectively implementing load-shifting strategies and shall recommend to the Legislature methods to eliminate or reduce those barriers.
(d)For purposes of this section, all of the following definitions apply:
(1)Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code.
(2)Electric service provider has the same meaning as defined in Section 218.3 of the Public Utilities Code.
(3)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(4)(A)Load shifting means a reduction in net peak demand during the top 100 net system load hours in a year, with net system load measured as gross bulk system load minus in-front-of-the-meter solar and wind generation.
(B)Load shifting may include either of the following:
(i)Load-modifying resources, including the use of demand flexibility resources or programs to alter an entitys load forecast and the use of time-varying rates to induce load flexibility.
(ii)Supply-side load flexibility resources, including resources that provide resource adequacy and other nonemergency demand response resources.
(C)Load shifting may include the use of backup generators, or any other greenhouse-gas-emitting resources, only within emergency programs.
(5)Local publicly owned electric utility has the same meaning as defined in Section 224.3 of the Public Utilities Code.
(6)Retail supplier means an electrical corporation, community choice aggregator, electric service provider, or local publicly owned electric utility. Retail supplier does not include an electrical corporation with 60,000 or fewer customer accounts in the state or a retail supplier with an annual electrical demand of less than 1,000 gigawatthours.
SEC. 2.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity to file an integrated resource plan, and a schedule for periodic updates to the plan, and shall ensure that load-serving entities do all of the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions pursuant to Section 38566 of the Health and Safety Code.
(B)Procure at least 60 percent eligible renewable energy resources by December 31, 2030, consistent with the state policy specified in Section 454.53 and Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)(i)Ensure system and local reliability on a short-term, midterm, and long-term basis, including meeting the short-term and forecast long-term resource adequacy requirements of Section 380, and require sufficient, predictable resource procurement and development to avoid unplanned energy supply shortfalls by taking into account impacts due to climate change, forecasted levels of building and transportation electrification, and other factors that can result in those shortfalls.
(ii)In furtherance of avoiding unplanned energy supply shortfalls or expensive emergency procurement and ensuring a more accurate understanding of electrical grid operational needs, the commission shall aggregate reported short-term and midterm resource procurement from all load-serving entities conducted under Section 380 or this section and assess midterm resource sufficiency, and annually provide anonymized reports to the Independent System Operator. The commission shall report forward resource procurement using counting conventions that provide the data to the Independent System Operator to be used in its grid planning.
(iii)To accomplish clause (i), the commission shall, as part of the integrated planning process, assess short-term, midterm, and long-term reliability by conducting probabilistic reliability modeling, including if there is sufficient capacity available for procurement in the short term and midterm by all load-serving entities to meet their procurement requirements. The commission shall review the results of that reliability modeling in a public proceeding at the same frequency as the forecast conducted in accordance with this section. When modeling short-term and midterm reliability, the commission shall model all procurement consistent with clause (ii) and may rely upon or incorporate probabilistic reliability modeling conducted by the Energy Commission into the commissions public process. The commission shall also report the modeling results in the joint Reliability Planning Assessments conducted under Section 25233 of the Public Resources Code.
(F)Comply with paragraph (1) of subdivision (b) of Section 399.13.
(G)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(H)Enhance distribution systems and demand-side energy management.(H)(i)In addition to, and separate from, the other requirements of this section, meet the incremental load-shifting allocation established in subdivision (b) of Section 25302.7 of the Public Resources Code, to the extent that the allocation is cost effective, as measured by the avoided cost calculator or in comparison to the cost of alternative sources of resource adequacy.
(ii)Each load-serving entity shall be allocated its share of credit for nonemergency load-shifting strategies that are procured or obtained by any centralized procurement mechanism, broadly applicable rate design program, or other collective activity for the purpose of including that load shifting in its plan.
(iii)A plan that does not forecast meeting its incremental load-shifting goal shall explain and document why it cannot be met cost-effectively or is otherwise unachievable and demonstrate that it is more cost effective to acquire incremental net peak capacity.
(I)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(J)Maintain a diverse portfolio of energy resources, which may include eligible energy resources procured by the Department of Water Resources.
(2)(A)The commission may authorize all source procurement for load-serving entities that includes various resource types including demand-side resources, supply-side resources, and resources that may be either demand-side resources or supply-side resources, taking into account the differing load-serving entities geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce the overall emissions of greenhouse gases from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(4)(A)On or before September 1, 2024, and consistent with the process and schedule adopted pursuant to paragraph (1), the commission, in consultation with the Energy Commission and the Independent System Operator, shall determine if there is a need for the procurement of eligible energy resources based on a review of the integrated resource plans submitted by load-serving entities in compliance with the requirements of this section and Section 454.53 and the progress towards meeting the portfolio of resources identified pursuant to subdivision (a) of Section 454.51.
(B)If the commission determines that there is a need for the procurement of eligible energy resources, the commission shall specify the eligible energy resources that should be procured to meet that need.
(C)Within six months of determining that there is a need for the procurement of eligible energy resources, the commission may request the Department of Water Resources to exercise its central procurement function to procure those eligible energy resources specified pursuant to subparagraph (B) that meet the portfolio of resources identified in subdivision (a) of Section 454.51.
(D)(i)Upon receiving a request pursuant to subparagraph (C), the Department of Water Resources, before January 1, 2035, may exercise its central procurement function to conduct one or more competitive solicitations and enter into contracts to procure eligible energy resources in order to achieve the policy of the state specified in Section 454.53.
(ii)Any contract entered into by the Department of Water Resources pursuant to clause (i) and approved by the commission pursuant to Section 80821 of the Water Code before January 1, 2035, shall remain in force for the duration of the contract.
(E)The Department of Water Resources exercising of its central procurement function to procure eligible energy resources pursuant to this paragraph shall be conducted in accordance with Division 29.5 (commencing with Section 80800) of the Water Code.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve all of the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of short-term, midterm, and long-term electricity, electricity-related, and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of short-term, midterm, and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51. The commission may order the procurement of resources with specific attributes by load-serving entities as a result of the integrated resource planning process and shall enforce any resource procurement requirements on a nondiscriminatory basis. Enforcement may include the assessment of penalties for noncompliance.
(d)To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
(e)This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined based on a three-year average commencing with January 1, 2013.
(f)(1)The commission shall not include the energy, capacity, or any attribute from Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025, in the adopted integrated resource plan portfolios, resource stacks, or preferred system plans.
(2)The commission shall disallow a load-serving entity from including in their adopted integrated resource plan any energy, capacity, or any attribute from the Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025.
(g)For a thermal powerplant that uses nuclear fission technology not constructed in the twenty-first century, all resource attributes shall be retired on January 1, 2031, and shall be reported as a separate, line item resource for purposes of complying with Section 398.4.
(h)(1)Only a new energy resource that meets all of the following requirements is eligible to be procured by the Department of Water Resources pursuant to this section:
(A)The resource directly supports attainment of the goals specified in Section 454.53 without increasing the states dependence on any fossil fuel-based resources.
(B)The resource is determined by the commission to not be under contract at sufficient levels as shown in load-serving entities most recent individual integrated resource plans submitted to and reviewed by the commission pursuant to this section to achieve the goals specified in Section 454.53.
(C)The resource has a construction and development lead time of at least five years.
(D)The resource does not generate electricity using fossil fuels or fuels derived from fossil fuels.
(E)The resource does not use combustion to generate electricity, unless that combustion use is ancillary and necessary to facilitate geothermal electricity generation.
(2)Resources from a pump hydroelectric facility may be procured by the Department of Water Resources pursuant to this section if the pump hydroelectric facility does not exceed 500 megawatts and has been directly appropriated funding by the state before January 1, 2023.
(i)For purposes of this section, the following definitions apply:
(1)Load-serving entity has the same meaning as defined in Section 380.
(2)Long term means a time period that includes five or more years in the future.
(3)Midterm means a time period between two and five years in the future.
(4)Short term means a time period between the present and two years in the future.
SEC. 3.Chapter 11 (commencing with Section 8500) is added to Division 4.1 of the Public Utilities Code, to read:11.Rates8500.(a)All retail suppliers shall provide rate information to the Energy Commissions Market-Informed Demand Automation Server in order to provide third-party devices with access to real-time rate information for the purpose of efficiently automating load flexibility.
(b)On or before January 1, 2028, the commission shall require all load-serving entities to offer optional dynamic pricing tariffs consistent with the Energy Commissions electric load management standards (Article 5 (commencing with Section 1621) of Chapter 4 of Division 2 of Title 20 of the California Code of Regulations) and the commissions California Flexible Unified Signal for Energy (CalFUSE) hourly dynamic pricing framework.
(c)(1)On or before January 1, 2028, the governing board of each local publicly owned electric utility shall consider offering dynamic pricing tariffs consistent with the Energy Commissions electric load management standards (Article 5 (commencing with Section 1621) of Chapter 4 of Division 2 of Title 20 of the California Code of Regulations) and the commissions California Flexible Unified Signal for Energy (CalFUSE) hourly dynamic pricing framework.
(2)If a governing board does not offer dynamic pricing tariffs, the governing board shall adopt a resolution explaining why the governing board does not believe it would be in the best interest of their ratepayers and post the resolution on its internet website.
(d)As part of a new or existing proceeding, the commission shall consider both of the following:
(1)Whether larger differentials between peak and off-peak time-of-use periods, including larger differentials for the transmission and distribution portion of rates, would be a cost-effective way to address peak load.
(2)Whether distinguishing between nighttime off-peak and daytime off-peak periods would be a cost-effective way to align flexible load with periods of abundant renewable and zero-carbon energy.
(e)For purposes of this section, all of the following definitions apply:
(1)Community choice aggregator has the same meaning as defined in Section 331.1.
(2)Electric service provider has the same meaning as defined in Section 218.3.
(3)Electrical corporation has the same meaning as defined in Section 218.
(4)Energy Commission means the State Energy Resources Conservation and Development Commission.
(5)Load-serving entity has the same meaning as defined in Section 380.
(6)Local publicly owned electric utility has the same meaning as defined in Section 224.3.
(7)Retail supplier means an electrical corporation, community choice aggregator, electric service provider, or local publicly owned electric utility. Retail supplier does not include electrical corporations with 60,000 or fewer customer accounts in the state or any retail supplier with an annual electrical demand of less than 1,000 gigawatthours.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Section 25545 of the Public Resources Code is amended to read:25545.For purposes of this chapter, the following definitions apply:(a)California Native American tribe has the same meaning as set forth in Section 21073.(b)Facility means any of the following:(1)A solar photovoltaic or terrestrial wind electrical generating powerplant with a generating capacity of 50 megawatts or more and any facilities appurtenant to that powerplant.(2)An energy storage system as defined in Section 2835 of the Public Utilities Code that is capable of storing 200 megawatthours or more of energy.(3)A stationary electrical generating powerplant using any source of thermal energy, with a generating capacity of 50 megawatts or more, excluding any powerplant that burns, uses, or relies on fossil or nuclear fuels.(4)A discretionary project as described in Section 21080 for which the applicant has certified that a capital investment of at least two hundred fifty million dollars ($250,000,000) will be made over a period of five years and the discretionary project is for (A) the manufacture, production, or assembly of an energy storage system or component manufacturing, wind system or component manufacturing, and solar photovoltaic energy system or component manufacturing, or (B) the manufacture, production, or assembly of specialized products, components, or systems that are integral to renewable energy or energy storage technologies.(5)An electrical transmission line carrying electricity from a facility described in paragraph (1), (2), or (3) that is located in the state to a point of junction with any interconnected electrical transmission system.(6)A hydrogen production facility and associated onsite storage and processing facilities that do not derive hydrogen from a fossil fuel feedstock and that receive funding from any of the following:(A)The Hydrogen Program established pursuant to Section 25664.1.(B)Section 91530.(C)The Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) authorized by Article 15 (commencing with Section 12100.160) of Chapter 1.6 of Part 2 of Division 3 of Title 2 of the Government Code, as awarded by the United States Department of Energy Office of Clean Energy Demonstrations.(c)Site means any location on which an eligible facility is constructed or is proposed to be constructed.For purposes of this chapter, the following definitions apply:
(a)California Native American tribe has the same meaning as set forth in Section 21073.
(b)Facility means any of the following:
(1)A solar photovoltaic or terrestrial wind electrical generating powerplant with a generating capacity of 50 megawatts or more and any facilities appurtenant thereto. to that powerplant.
(2)An energy storage system as defined in Section 2835 of the Public Utilities Code that is capable of storing 200 megawatthours or more of energy.
(3)A stationary electrical generating powerplant using any source of thermal energy, with a generating capacity of 50 megawatts or more, excluding any powerplant that burns, uses, or relies on fossil or nuclear fuels.
(4)A discretionary project as described in Section 21080 for which the applicant has certified that a capital investment of at least two hundred fifty million dollars ($250,000,000) will be made over a period of five years and the discretionary project is for (A) the manufacture, production, or assembly of an energy storage system or component manufacturing, wind system or component manufacturing, and solar photovoltaic energy system or component manufacturing, or (B) the manufacture, production, or assembly of specialized products, components, or systems that are integral to renewable energy or energy storage technologies.
(5)An electrical transmission line carrying electricity from a facility described in paragraph (1), (2), or (3) that is located in the state to a point of junction with any interconnected electrical transmission system.
(6)A hydrogen production facility and associated onsite storage and processing facilities that do not derive hydrogen from a fossil fuel feedstock and that receive funding from any of the following:
(A)The Hydrogen Program established pursuant to Section 25664.1.
(B)Section 91530, as added by the Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024 (Section 2 of Chapter 83 of the Statutes of 2024 (Senate Bill No. 867)), if that act is approved by the voters at the November 5, 2024, statewide general election. 91530.
(C)The Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) authorized by Article 15 (commencing with Section 12100.160) of Chapter 1.6 of Part 2 of Division 3 of Title 2 of the Government Code, as awarded by the United States Department of Energy Office of Clean Energy Demonstrations.
(c)Site means any location on which an eligible facility is constructed or is proposed to be constructed.
|
Date
|
Status
|
|---|---|
| Mar 2, 2026 | Veto sustained. |
| Mar 2, 2026 | Stricken from file. |
| Oct 3, 2025 | In Senate. Consideration of Governor's veto pending. |
| Oct 3, 2025 | Vetoed by the Governor. |
| Sep 23, 2025 | Enrolled and presented to the Governor at 2 p.m. |
| Sep 13, 2025 | Assembly amendments concurred in. (Ayes 29. Noes 8. Page 3036.) Ordered to engrossing and enrolling. |
| Sep 13, 2025 | In Senate. Concurrence in Assembly amendments pending. |
| Sep 12, 2025 | Read third time. Passed. (Ayes 57. Noes 15. Page 3415.) Ordered to the Senate. |
| Sep 5, 2025 | Ordered to third reading. |
| Sep 5, 2025 | Read third time and amended. |
| Sep 3, 2025 | Read second time. Ordered to third reading. |
| Sep 2, 2025 | Read second time and amended. Ordered to second reading. |
| Aug 29, 2025 | From committee: Do pass as amended. (Ayes 11. Noes 4.) (August 29). |
| Aug 20, 2025 | August 20 set for first hearing. Placed on APPR. suspense file. |
| Jul 17, 2025 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 17, 2025 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 13. Noes 2.) (July 16). |
| Jul 17, 2025 | Assembly Rule 63 suspended. (Ayes 49. Noes 15. Page 2578.) |
| Jul 8, 2025 | July 9 hearing postponed by committee. |
| Jun 26, 2025 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on U. & E. |
| Jun 9, 2025 | Referred to Com. on U. & E. |
| Jun 4, 2025 | In Assembly. Read first time. Held at Desk. |
| Jun 3, 2025 | Read third time. Passed. (Ayes 27. Noes 10. Page 1447.) Ordered to the Assembly. |
| May 27, 2025 | Read second time. Ordered to third reading. |
| May 23, 2025 | Read second time and amended. Ordered to second reading. |
| May 23, 2025 | From committee: Do pass as amended. (Ayes 5. Noes 1. Page 1203.) (May 23). |
| May 16, 2025 | Set for hearing May 23. |
| May 12, 2025 | May 12 hearing: Placed on APPR. suspense file. |
| May 2, 2025 | Set for hearing May 12. |
| Apr 29, 2025 | Read second time and amended. Re-referred to Com. on APPR. |
| Apr 28, 2025 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 13. Noes 4. Page 810.) (April 21). |
| Apr 10, 2025 | Set for hearing April 21. |
| Apr 2, 2025 | Re-referred to Com. on E., U & C. |
| Mar 24, 2025 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Mar 5, 2025 | Referred to Com. on RLS. |
| Feb 21, 2025 | From printer. May be acted upon on or after March 23. |
| Feb 20, 2025 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 13, 2025 | Unfinished Business SB541 Becker et al. Concurrence | Senate Floor |
Passed |
|
| Sep 12, 2025 | Unfinished Business SB541 Becker et al. Concurrence | Senate Floor |
Passed |
|
| Sep 12, 2025 | SB 541 Becker Senate Third Reading By Schultz | Assembly Floor |
Passed |
|
| Aug 29, 2025 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jul 16, 2025 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Energy |
Passed |
|
| Jun 3, 2025 | Senate 3rd Reading SB541 Becker et al. | Senate Floor |
Passed |
|
| May 23, 2025 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| May 12, 2025 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 21, 2025 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 350 Humboldt | ** Support | |
| 350 Sacramento | ** Support | |
| Advanced Energy United | ** Support | |
| Ava Community Energy Authority | ** Support | |
| BURBANK/BURBANK REDEVELOPMENT AGENCY; CITY OF | ** Against | |
| California Community Choice Association | ** Against | |
| california efficiency + demand management council | ** Support | |
| California Energy Storage Alliance | ** Support | |
| California Municipal Utilities Association | ** Against | |
| California Solar & Storage Association | ** Support | |
| California Special Districts Association | ** Against | |
| Carbon Free Palo Alto | ** Support | |
| Carbon Free Silicon Valley | ** Support | |
| Clean Coalition | ** Support | |
| Clean energy industry groups and associations | ** Support | |
| Climate Action California | ** Support | |
| Coalition For Community Solar Access | ** Support | |
| Coalition of California Utility Employees | ** Support | |
| Deploy Action | ** Support | |
| Imperial Irrigation District | ** Against | |
| Load serving entities | ** Against | |
| Load-serving entities (public and private electricity providers) | ** Against | |
| Marin Clean Energy | ** Against | |
| Menlo Spark | ** Support | |
| Microgrid Resources Coalition | ** Support | |
| Natural Resources Defense Council | ** Support | |
| Nexamp | ** Support | |
| Northern California Power Agency | ** Against | |
| Northern California Power Authority | ** Against | |
| Pacific Gas And Electric Company | ** Against | |
| Public Advocates Office | ** Against | |
| Rewiring America | ** Support | |
| Sacramento Municipal Utility District | ** Against | |
| San Diego Gas & Electric Company | ** Against | |
| San Jose Community Energy Advocates | ** Support | |
| School Energy Coalition | ** Support | |
| Southern California Edison Company | ** Against | |
| Southern California Public Power Authority | ** Against | |
| Statewide and regional associations representing the state's municipal utilities (publicly owned utilities, POUs) | ** Against | |
| The Climate Center | ** Support | |
| The Climate Reality Project-Silicon Valley Chapter | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 541 |
VETO
Bill No: SB 541
Author: Becker (D), et al.
Enrolled: 9/17/25
Vote: 27
SENATE ENERGY, U. & C. COMMITTEE: 13-4, 4/21/25
AYES: Becker, Allen, Archuleta, Arreguín, Ashby, Caballero, Gonzalez, Grayson, Limón, McNerney, Rubio, Stern, Wahab
NOES: Ochoa Bogh, Dahle, Grove, Strickland
SENATE APPROPRIATIONS COMMITTEE: 5-1, 5/23/25
AYES: Caballero, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto
NO VOTE RECORDED: Dahle
SENATE FLOOR: 27-10, 6/3/25
AYES: Allen, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Cortese, Durazo, Gonzalez, Grayson, Laird, Limón, McGuire, McNerney, Menjivar, Padilla, Pérez, Rubio, Smallwood-Cuevas, Stern, Umberg, Wahab, Weber Pierson, Wiener
NOES: Alvarado-Gil, Choi, Dahle, Grove, Jones, Niello, Ochoa Bogh, Seyarto, Strickland, Valladares
NO VOTE RECORDED: Hurtado, Reyes, Richardson
SENATE FLOOR: 29-8, 9/13/25
AYES: Allen, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Cortese, Durazo, Grayson, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Padilla, Pérez, Reyes, Richardson, Rubio, Smallwood-Cuevas, Stern, Umberg, Wahab, Weber Pierson, Wiener
NOES: Alvarado-Gil, Dahle, Grove, Jones, Niello, Ochoa Bogh, Seyarto, Strickland
NO VOTE RECORDED: Choi, Gonzalez, Valladares
ASSEMBLY FLOOR: 57-15, 9/12/25 - See last page for vote
SUBJECT: Electricity: load shifting
SOURCE: Author
DIGEST:
- This bill requires the California Energy Commission (CEC), as part of an existing biennial report, to estimate each retail supplier’s load-shifting potential, giving consideration to certain factors, including cost-effectiveness; and to publish, on or before July 1, 2028, and biennially thereafter, the amount of load shifting that each retail supplier achieved in the prior calendar year.
ANALYSIS:
Existing law:
- Existing law vests the California Public Utilities Commission (CPUC) with regulatory jurisdiction over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) to adopt a biennial integrated energy policy report (IEPR) containing certain information in a specified format. (Public Resources Code §25302)
- Requires the CEC, in consultation with the CPUC, and the California Independent System Operator (CAISO), to adopt a goal for load shifting to reduce net peak electrical demand and adjust this target in each biennial IEPR thereafter. (Public Resources Code §25302.7)
- Requires the CPUC to adopt a process for each load-serving entity (LSE) to file an integrated resource plan (IRP) and a schedule for periodic updates to the plan and to ensure that LSEs, among other things, enhance distribution systems and demand-side energy management. (Public Utilities Code §454.52)
- Requires that all rates for any service or product charged by an electrical corporation must be just and reasonable. (Public Utilities Code §451)
- Authorizes the CPUC to authorize electrical corporations to offer residential customers the option of receiving service on time-variant pricing (time-of-use rates, critical peak-pricing, and real-time pricing). Prohibits the CPUC from establishing a mandatory default time-variant pricing tariff for residential customers, except for default time-of-use rates. Requires the CPUC to ensure that any time-of-use rate schedule does not cause unreasonable hardship for senior citizens or economically vulnerable customers in hot climate zones. (Public Utilities Code §745)
This bill:
- Makes several findings and declarations concerning the potential for load flexibility to help reduce peak load and provide cost-saving opportunities.
- Requires the CEC, in consultation with the CPUC, CAISO, California balancing authorities, to analyze the cost-effectiveness of specific load flexibility programs and other types of load-shifting interventions and identify both the approximate amount of load shifting and the cost-effectiveness of each type of load-shifting intervention in the next update to the biennial IEPR after January 1, 2027.
- Requires the CEC, as part of each biennially IEPR, to estimate each retail supplier’s load-shifting potential, giving consideration to certain factors.
- Requires the CEC, on or before July 1, 2028, and biennially thereafter, to analyze and publish the amount of load shifting that each retail supplier achieved in the prior calendar year.
- Defines “retail seller” to mean an electrical corporation, community choice aggregator (CCA), electric service provider (ESP), or local electric publicly owned utility (POU) and excludes an electrical corporation with 60,000 or fewer customer accounts or a retail supplier with an annual electrical demand of less than 1,000 gigawatt-hours (GWh).
Background
A changing electric grid. The electric grid is undergoing tremendous shifts, including transitioning to cleaner (often intermittent) resources (e.g. solar and wind) at a tremendous pace and scale, changing weather conditions/patterns (including more extreme temperature and storms), and switching or substituting energy uses (e.g. transportation and heating from fossil fuels to electricity). After the unexpected rotating outages called by the CAISO in late summer 2020 during west-wide extreme heat event, the Governor and Legislature took several actions to address supply shortages during and in the aftermath of these events. These actions include near term procurement orders and increasing planning reserve margins, billions of dollars from the state general fund to establish the Electricity Strategic Supply Reliability Reserve, and authorizing the extended operations of the state’s sole remaining nuclear power plant. Within the authorizing legislation for the extension of Diablo Canyon nuclear power plant, SB 846 (Dodd, Chapter 239, Statutes of 2022) also required the CEC, in consultation with the CPUC, and CAISO, to adopt a goal for load shifting to reduce net peak electrical demand and to adjust this target in each biennial IEPR.
About load shifting. Load shifting reflects the understanding that when electricity is used can be just as important as how much is used. Load shifting entails beneficially shifting electric load (or demand) away from times when electricity is scarce, expensive, and highly polluting to times when electricity is inexpensive, clean, and plentiful. Load shifting can play an important role in helping to address the challenges on the electric grid by aligning customer demand with the supply of clean energy. Load shifting has the potential to help integrate renewable generation, reduce the strain on the electric grid, and help maintain reliability during extreme events. As electrified load increases, especially from electric vehicles, heat pumps, as well as, further adoption of distributed energy resources (especially from solar and energy storage), the need for investments in grid infrastructure may also rise and the opportunities for load shifting also increase.
CEC SB 846 Load-Shift Goal Report. In May 2023, the CEC issued the report required in SB 846 on establishing a load-shifting goal and informed by the 2020 Lawrence Berkeley National Laboratory report on the Shift Resource through 2030, and other relevant research, as required by the statute. The CEC developed a statewide load-shift goal for 2030 of 7,000 megawatts (MW), including 3,400-3,900 MW of incremental resources. The goal encompasses three categories of load flexibility resources:
- Load-modifying demand flexibility resources (3,000 MW) directly impact the load forecast and resource procurement requirements of LSEs. The most common category is time-varying rates, such as time-of-use or hourly dynamic rates that reflect actual grid conditions.
- Resource planning and procurement load flexibility resources (1,620-1,775 MW) either contributes to meeting Resource Adequacy (RA) requirements or reduces RA requirements as a credit. This category includes supply-side demand response that participates in the CAISO as economic or reliability demand response.
- Incremental and emergency load-flexibility resource programs (1,175 MW) intended to increase resource availability during extreme events and do not contribute to meeting RA requirements. These include the Emergency Load Reduction Program and the Demand Side Grid Support program which can be activated during emergency grid events.
The CEC report cautions the statewide goal is based on economic potential.
Further analysis is needed to determine the cost-effectiveness of specific load flexibility resources and programs. …The proposed goal is not intended to suggest that the state should pursue these targets without the evaluation of the cost-effectiveness of specific resources or programs that would contribute to the goal.
The report also includes 18 policy recommendations to support deployment of the three category of resources.
CEC and CPUC efforts to employ time-varying rates. In addition to the SB 846 report, both the CEC and CPUC are pursuing load flexibility from time-varying rates. The CEC’s Load Management Standard proceeding has directed LSEs to create at least one hourly rate offering, or an equivalent program, by 2027. The MIDAS provides a centralized rate database that customers, developers, and devices can use to access rate information. The Flexible Demand Appliance Standards (FDAS) will provide direction to device manufacturers to enable beneficial load flexibility in response to these rates. In June 2022, the CPUC staff issued a report with a proposed roadmap for hourly dynamic pricing to enable widespread load flexibility, including load shifting, called the California Flexible Unified Signal for Energy (CalFUSE). Subsequently, the CPUC opened a rulemaking, Order Instituting Rulemaking to Advance Demand Flexibility Through Electric Rates (R. 22-07-005), to enable widespread demand flexibility, instead of the historical piecemeal approach. As part of the proceeding the CPUC has directed electric investor-owned utilities (IOUs) to deploy pilot programs to gain learnings and understandings about the effects of dynamic rates.
Integrated Energy Policy Report (IEPR). The IEPR provides a cohesive approach to identifying and solving the state’s pressing energy needs and issues. The report, which is crafted in collaboration with a range of stakeholders, develops and implements energy plans and policies. SB 1389 (Bowen and Sher, Chapter 568, Statutes of 2002) required the CEC to conduct assessments and forecasts of all aspects of energy industry supply, production, transportation, delivery and distribution, demand, and prices. The CEC is then required to use these assessments and forecasts to develop energy policies that conserve resources, protect the environment, ensure energy reliability, enhance the state's economy, and protect public health and safety.” The CEC adopts an IEPR every two years and an update every other year.
Comments
Need for this bill. The author states:
Electrical bills have grown unsustainably, and the state is looking for ways to constrain future cost increases. Electricity system costs (at least for transmission and distribution) are mostly driven by the need to provide reliable power during the periods of highest demand. If utilities can lower their system peak energy demand – by getting customers to adjust thermostats or shift some of their demand to other times of day, for example – then the utilities can serve more demand during off-peak hours (which helps to lower rates) while avoiding new investments to add to peak capacity. The CEC’s “Load-Shift Goal Report” set a goal of achieving 7000 MW of cost-effective load shifting by 2030 (with 3400-3900 MW of that not yet being captured). While the CEC’s goal has shed light on this large cost-saving opportunity, more is needed to push our electricity suppliers to capture those savings and make load-flexibility a routine part of their system planning and energy procurement efforts.
Impacts to ratepayers. As the supporters of this bill note, the increasing costs of utility bills, along with anticipated expansion of new resources and the electric grid, necessitate ensuring that electric grid investments are judicious and prudent. Load shifting provides a tool with the potential to better optimize electric grid resources while shifting load during times when cleaner, and less expensive, electricity is available. Successful deployment of load shifting can be a win-win for participating customers and all customers. However, as the opposition to this bill contends there are potential risks that must also be mitigated, especially in relation to dynamic rates and ensuring the resources are cost-effective. Moreover, to the extent load-shifting resources are required as part of LSEs’ procurement, ensuring these resources compete with others can help support the least-cost, best-fit principles. The CEC, in its report, acknowledged the load-shift goal is “aspirational, but achievable with robust policy support” and merits further evaluation for cost-effectiveness. The CEC also expressed reluctance to recommend subgoals for specific program types, sectors, or jurisdictions. This bill does not mandate procurement, but would require the CEC to report on the estimated procurement to meet the load-shifting goal by each retail supplier (except those electric POUs who are excluded from the requirement of the CEC’s Power Content Label requirements). The bill requires the CEC to analyze the cost-effectiveness of each load-shifting measure. Electric POUs oppose the requirements to have the CEC establish standards on them to report on the estimated load-shifting they have undertaken and to annually report on their efforts. They believe this reporting is burdensome and not beneficial, as their local governing boards make decisions about solutions that work best in their service territory.
Related/Prior Legislation
AB 1117 (Schultz) of 2025, would have required the CPUC, by July 1, 2028, to develop optional, dynamic electricity rates for large electrical investor-owned utility customers. The bill was held in the Senate Appropriations Committee.
SB 846 (Dodd, Chapter 239, Statutes of 2022) among its many provisions, required the CEC, in consultation with the CPUC, and CAISO, to adopt a goal for load-shifting to reduce net peak electrical demand and to adjust this target in each biennial IEPR.
AB 327 (Perea, Chapter 611, Statutes of 2013) among its many provisions, restructured the rate design for residential electric customers.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Assembly Appropriations Committee:
This bill creates significant new analytical, administrative and regulatory workload for both CEC and CPUC, with ongoing annual costs likely in the high hundreds of thousands of dollars, at least.
- CEC anticipates the need for $656,000 ongoing for three permanent positions to:
- Lead development of rules and guidelines for load shift credit accounting, manage data reporting process for retail suppliers and track the state’s progress toward increased load flexibility.
- Facilitate interagency coordination and lead strategy development efforts.
- Evaluate the ability of load flexibility resources to qualify for or reduce a load-serving entity’s resource adequacy obligations.
CEC notes its main funding source, ERPA, faces an ongoing structural deficit and warns it, therefore, may not be an appropriate fund source to support the implementation of this bill.
- The CPUC describes the work this bill creates for it as developing a strategy to reduce distribution infrastructure investments through cost-effective deployment of distributed resources and load shifting; directing IOUs to implement new programs and rate designs and overseeing their implementation; integrating new data into planning processes; and coordinating closely with CEC and CAISO.
The CPUC estimates costs of approximately $1.4 million (Public Utilities Commission Utilities Reimbursement Account), as follows: $911,000 for three permanent senior regulatory analysts and $257,000 for one three-year limited-term administrative law judge, and $480,000 for outside consultants, hardware and staff training, including modeling capacity and updated avoided cost studies.
SUPPORT: (Verified 10/6/25)
350 Humboldt
350 Sacramento
Advanced Energy United
California Efficiency + Demand Management Council California Energy Storage Alliance
California Solar & Storage Association Carbon Free Palo Alto
Carbon Free Silicon Valley
Clean Coalition
Climate Action California
Coalition for Community Solar Access
Deploy Action
Menlo Spark
Microgrid Resources Coalition
Natural Resources Defense Council
Nexamp
San Jose Community Energy Advocates
School Energy Coalition
The Climate Center
The Climate Reality Project - Silicon Valley Chapter
OPPOSITION: (Verified 10/6/25)
California Community Choice Association
California Municipal Utilities Association
California Special Districts Association
Marin Clean Energy Northern California Power Agency
Sacramento Municipal Utility District
Southern California Public Power Authority
ARGUMENTS IN SUPPORT: The Natural Resources Defense Council states:
…[SB 541] would reinforce and smooth the implementation of the state’s load flexibility goal, while requiring cost-effectiveness and strategic integration. Increasing cost-effective load flexibility on the grid can be beneficial because it allows for more effective use of electrified buildings and vehicles, reduces the electricity infrastructure costs needed to support economic development, and increases the reliability and resiliency of the grid. …SB 541 applies a reasonable next step toward cost-effectively and strategically increasing and investing in load-shifting resources to support a more resilient, zero-emission electricity grid.
ARGUMENTS IN OPPOSITION: According to the California Municipal Utility Association, the Sacramento Municipal Utility District, the Northern California Power Agency, and the Southern California Public Power Association (SCPPA):
SB 541(Becker), while well-intentioned, would require the California Energy Commission (CEC) to perform onerous and duplicative evaluations of publicly owned electric utility (POU) load-shifting programs. Although POUs have offered amendments throughout the year to resolve all our concerns, our concerns have not been addressed and thus, we must still regretfully oppose the bill. The CEC would be required to analyze the cost-effectiveness of individual POUs’ load flexibility programs and to make top-down determinations of load shift potential. This approach duplicates POUs’ existing evaluations and undermines POUs’ ability to design and value load shift programs based on specific needs and customer preferences. CMUA member utilities are committed to enhancing grid reliability, reducing emissions, and advancing California’s clean energy goals through programs that reflect the needs of the communities they serve. SB 541, however, could lead to the CEC imposing demand shift mandates on POUs that risk creating significant burdens for POUs and could undermine their ability to develop cost-effective, locally tailored load management strategies.
GOVERNOR'S VETO MESSAGE:
I am returning Senate Bill 541 without my signature.
This bill would require the California Energy Commission (CEC), in coordination with the California Public Utilities Commission (CPUC and California Independent Systems Operator (CAISO), to analyze the cost-effectiveness of certain electric load-shifting strategies, estimate each electric retail supplier’s load-shifting potential, and analyze and publish the amount of load-shifting that each electric retailer supplier achieved in the prior calendar year.
Deploying strategies to cost-effectively manage the state’s electric demand remains a critical tool for maintaining electric grid reliability during extreme events, integrating variable and intermittent renewable and clean energy resources into the electric grid, and reducing electric service costs for customers. This is why the CAISO, CEC, and CPUC continue to explore, develop, and deploy protocols, standards, electric rate tariffs, incentive programs, and new and updated valuation approaches to shape, shift, shimmy, and shed electric load that benefits both the electric grid and electric customers.
While I appreciate the author’s intent, this bill is largely redundant and, in some cases, disruptive of existing and planned efforts by the CPUC, CEC and CAISO to maximize the cost-effective potential of electric load-management strategies. This bill would also impose a new workload on the CPUC and CEC, requiring additional resources to support its implementation. At a time when electric bill affordability continues to be a pervasive challenge, it is important that we consider the workload and cost impacts on the CEC and CPUC, some of which are ultimately borne by electric customers, to avoid further compounding the costs embedded in customer electric bills.
For these reasons, I cannot sign this bill.
ASSEMBLY FLOOR: 57-15, 9/12/25
AYES: Addis, Aguiar-Curry, Ahrens, Alvarez, Arambula, Ávila Farías, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Connolly, Elhawary, Fong, Gabriel, Garcia, Gipson, Mark González, Haney, Harabedian, Hart, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Pellerin, Petrie-Norris, Quirk-Silva, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Valencia, Ward, Wicks, Wilson, Zbur, Rivas
NOES: Alanis, Castillo, Davies, DeMaio, Dixon, Ellis, Gallagher, Jeff Gonzalez, Hadwick, Hoover, Johnson, Macedo, Sanchez, Ta, Tangipa
NO VOTE RECORDED: Bains, Chen, Flora, Lackey, Patterson, Ramos, Ransom, Wallis
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
10/8/25 9:56:13
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 541 |
UNFINISHED BUSINESS
Bill No: SB 541
Author: Becker (D), et al.
Amended: 9/5/25
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 13-4, 4/21/25
AYES: Becker, Allen, Archuleta, Arreguín, Ashby, Caballero, Gonzalez, Grayson, Limón, McNerney, Rubio, Stern, Wahab
NOES: Ochoa Bogh, Dahle, Grove, Strickland
SENATE APPROPRIATIONS COMMITTEE: 5-1, 5/23/25
AYES: Caballero, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto
NO VOTE RECORDED: Dahle
SENATE FLOOR: 27-10, 6/3/25
AYES: Allen, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Cortese, Durazo, Gonzalez, Grayson, Laird, Limón, McGuire, McNerney, Menjivar, Padilla, Pérez, Rubio, Smallwood-Cuevas, Stern, Umberg, Wahab, Weber Pierson, Wiener
NOES: Alvarado-Gil, Choi, Dahle, Grove, Jones, Niello, Ochoa Bogh, Seyarto, Strickland, Valladares
NO VOTE RECORDED: Hurtado, Reyes, Richardson
ASSEMBLY FLOOR: 46-14, 9/12/25 – Roll call vote not available.
SUBJECT: Electricity: load shifting
SOURCE: Author
DIGEST:
- This bill requires the California Energy Commission (CEC), as part of an existing biennially report, to estimate each retail supplier’s load-shifting potential, giving consideration to certain factors, including cost-effectiveness; and to publish, on or before July 1, 2028, and biennially thereafter, the amount of load shifting that each retail supplier achieved in the prior calendar year.
Assembly Amendments
of 9/5/25 make numerous substantive and clarifying amendments, including requiring the CEC to analyze the cost-effectiveness of specific load flexibility programs and other load-shifting interventions; recasts the requirements on the CEC to allocate a load-shifting estimate to each retail supplier; adds findings and declarations; and makes other clarifying changes.
ANALYSIS:
Existing law:
- Existing law vests the California Public Utilities Commission (CPUC) with regulatory jurisdiction over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) to adopt a biennial integrated energy policy report (IEPR) containing certain information in a specified format. (Public Resources Code §25302)
- Requires the CEC, in consultation with the CPUC, and the California Independent System Operator (CAISO), to adopt a goal for load shifting to reduce net peak electrical demand and adjust this target in each biennial IEPR thereafter. (Public Resources Code §25302.7)
- Requires the CPUC to adopt a process for each load-serving entity (LSE) to file an integrated resource plan (IRP) and a schedule for periodic updates to the plan and to ensure that LSEs, among other things, enhance distribution systems and demand-side energy management. (Public Utilities Code §454.52)
- Requires that all rates for any service or product charged by an electrical corporation must be just and reasonable. (Public Utilities Code §451)
- Authorizes the CPUC to authorize electrical corporations to offer residential customers the option of receiving service on time-variant pricing (time-of-use rates, critical peak-pricing, and real-time pricing). Prohibits the CPUC from establishing a mandatory default time-variant pricing tariff for residential customers, except for default time-of-use rates. Requires the CPUC to ensure that any time-of-use rate schedule does not cause unreasonable hardship for senior citizens or economically vulnerable customers in hot climate zones. (Public Utilities Code §745)
This bill:
- Makes several findings and declarations concerning the potential for load flexibility to help reduce peak load and provide cost-saving opportunities.
- Requires the CEC, in consultation with the CPUC, CAISO, California balancing authorities, to analyze the cost-effectiveness of specific load flexibility programs and other types of load-shifting interventions and identify both the approximate amount of load shifting and the cost-effectiveness of each type of load-shifting intervention in the next update to the biennial IEPR after January 1, 2027.
- Requires the CEC, as part of each biennially IEPR, to estimate each retail supplier’s load-shifting potential, giving consideration to certain factors.
- Requires the CEC, on or before July 1, 2028, and biennially thereafter, to analyze and publish the amount of load shifting that each retail supplier achieved in the prior calendar year.
- Defines “retail seller” to mean an electrical corporation, community choice aggregator (CCA), electric service provider (ESP), or local electric publicly owned utility (POU) and excludes an electrical corporation with 60,000 or fewer customer accounts or a retail supplier with an annual electrical demand of less than 1,000 gigawatt-hours (GWh).
Background
A changing electric grid. The electric grid is undergoing tremendous shifts, including transitioning to cleaner (often intermittent) resources (e.g. solar and wind) at a tremendous pace and scale, changing weather conditions/patterns (including more extreme temperature and storms), and switching or substituting energy uses (e.g. transportation and heating from fossil fuels to electricity). After the unexpected rotating outages called by the CAISO in late summer 2020 during west-wide extreme heat event, the Governor and Legislature took several actions to address supply shortages during and in the aftermath of these events. These actions include near term procurement orders and increasing planning reserve margins, billions of dollars from the state general fund to establish the Electricity Strategic Supply Reliability Reserve, and authorizing the extended operations of the state’s sole remaining nuclear power plant. Within the authorizing legislation for the extension of Diablo Canyon nuclear power plant, SB 846 (Dodd, Chapter 239, Statutes of 2022) also required the CEC, in consultation with the CPUC, and CAISO, to adopt a goal for load shifting to reduce net peak electrical demand and to adjust this target in each biennial IEPR.
About load shifting. Load shifting reflects the understanding that when electricity is used can be just as important as how much is used. Load shifting entails beneficially shifting electric load (or demand) away from times when electricity is scarce, expensive, and highly polluting to times when electricity is inexpensive, clean, and plentiful. Load shifting can play an important role in helping to address the challenges on the electric grid by aligning customer demand with the supply of clean energy. Load shifting has the potential to help integrate renewable generation, reduce the strain on the electric grid, and help maintain reliability during extreme events. As electrified load increases, especially from electric vehicles, heat pumps, as well as, further adoption of distributed energy resources (especially from solar and energy storage), the need for investments in grid infrastructure may also rise and the opportunities for load shifting also increase.
CEC SB 846 Load-Shift Goal Report. In May 2023, the CEC issued the report required in SB 846 on establishing a load-shifting goal and informed by the 2020 Lawrence Berkeley National Laboratory report on the Shift Resource through 2030, and other relevant research, as required by the statute. The CEC developed a statewide load-shift goal for 2030 of 7,000 megawatts (MW), including 3,400-3,900 MW of incremental resources. The goal encompasses three categories of load flexibility resources:
- Load-modifying demand flexibility resources (3,000 MW) directly impact the load forecast and resource procurement requirements of LSEs. The most common category is time-varying rates, such as time-of-use or hourly dynamic rates that reflect actual grid conditions.
- Resource planning and procurement load flexibility resources (1,620-1,775 MW) either contributes to meeting Resource Adequacy (RA) requirements or reduces RA requirements as a credit. This category includes supply-side demand response that participates in the CAISO as economic or reliability demand response.
- Incremental and emergency load-flexibility resource programs (1,175 MW) intended to increase resource availability during extreme events and do not contribute to meeting RA requirements. These include the Emergency Load Reduction Program and the Demand Side Grid Support program which can be activated during emergency grid events.
The CEC report cautions the statewide goal is based on economic potential.
Further analysis is needed to determine the cost-effectiveness of specific load flexibility resources and programs. …The proposed goal is not intended to suggest that the state should pursue these targets without the evaluation of the cost-effectiveness of specific resources or programs that would contribute to the goal.
The report also includes 18 policy recommendations to support deployment of the three category of resources.
CEC and CPUC efforts to employ time-varying rates. In addition to the SB 846 report, both the CEC and CPUC are pursuing load flexibility from time-varying rates. The CEC’s Load Management Standard proceeding has directed LSEs to create at least one hourly rate offering, or an equivalent program, by 2027. The MIDAS provides a centralized rate database that customers, developers, and devices can use to access rate information. The Flexible Demand Appliance Standards (FDAS) will provide direction to device manufacturers to enable beneficial load flexibility in response to these rates. In June 2022, the CPUC staff issued a report with a proposed roadmap for hourly dynamic pricing to enable widespread load flexibility, including load shifting, called the California Flexible Unified Signal for Energy (CalFUSE). Subsequently, the CPUC opened a rulemaking, Order Instituting Rulemaking to Advance Demand Flexibility Through Electric Rates (R. 22-07-005), to enable widespread demand flexibility, instead of the historical piecemeal approach. As part of the proceeding the CPUC has directed electric investor-owned utilities (IOUs) to deploy pilot programs to gain learnings and understandings about the effects of dynamic rates.
Integrated Energy Policy Report (IEPR). The IEPR provides a cohesive approach to identifying and solving the state’s pressing energy needs and issues. The report, which is crafted in collaboration with a range of stakeholders, develops and implements energy plans and policies. SB 1389 (Bowen and Sher, Chapter 568, Statutes of 2002) required the CEC to conduct assessments and forecasts of all aspects of energy industry supply, production, transportation, delivery and distribution, demand, and prices. The CEC is then required to use these assessments and forecasts to develop energy policies that conserve resources, protect the environment, ensure energy reliability, enhance the state's economy, and protect public health and safety.” The CEC adopts an IEPR every two years and an update every other year.
Comments
Need for this bill. The author states:
Electrical bills have grown unsustainably, and the state is looking for ways to constrain future cost increases. Electricity system costs (at least for transmission and distribution) are mostly driven by the need to provide reliable power during the periods of highest demand. If utilities can lower their system peak energy demand – by getting customers to adjust thermostats or shift some of their demand to other times of day, for example – then the utilities can serve more demand during off-peak hours (which helps to lower rates) while avoiding new investments to add to peak capacity. The CEC’s “Load-Shift Goal Report” set a goal of achieving 7000 MW of cost-effective load shifting by 2030 (with 3400-3900 MW of that not yet being captured). While the CEC’s goal has shed light on this large cost-saving opportunity, more is needed to push our electricity suppliers to capture those savings and make load-flexibility a routine part of their system planning and energy procurement efforts.
Impacts to ratepayers. As the supporters of this bill note, the increasing costs of utility bills, along with anticipated expansion of new resources and the electric grid, necessitate ensuring that electric grid investments are judicious and prudent. Load shifting provides a tool with the potential to better optimize electric grid resources while shifting load during times when cleaner, and less expensive, electricity is available. Successful deployment of load shifting can be a win-win for participating customers and all customers. However, as the opposition to this bill contends there are potential risks that must also be mitigated, especially in relation to dynamic rates and ensuring the resources are cost-effective. Moreover, to the extent load-shifting resources are required as part of LSEs’ procurement, ensuring these resources compete with others can help support the least-cost, best-fit principles. The CEC, in its report, acknowledged the load-shift goal is “aspirational, but achievable with robust policy support” and merits further evaluation for cost-effectiveness. The CEC also expressed reluctance to recommend subgoals for specific program types, sectors, or jurisdictions. This bill does not mandate procurement, but would require the CEC to report on the estimated procurement to meet the load-shifting goal by each retail supplier (except those electric POUs who are excluded from the requirement of the CEC’s Power Content Label requirements). The bill requires the CEC to analyze the cost-effectiveness of each load-shifting measure. Electric POUs oppose the requirements to have the CEC establish standards on them to report on the estimated load-shifting they have undertaken and to annually report on their efforts. They believe this reporting is burdensome and not beneficial, as their local governing boards make decisions about solutions that work best in their service territory.
Related/Prior Legislation
AB 1117 (Schultz) of 2025, requires the CPUC, by July 1, 2028, to develop optional, dynamic electricity rates for large electrical investor-owned utility customers. The bill was held in the Senate Appropriations Committee.
SB 846 (Dodd, Chapter 239, Statutes of 2022) among its many provisions, required the CEC, in consultation with the CPUC, and CAISO, to adopt a goal for load-shifting to reduce net peak electrical demand and to adjust this target in each biennial IEPR.
AB 327 (Perea, Chapter 611, Statutes of 2013) among its many provisions, restructured the rate design for residential electric customers.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Assembly Appropriations Committee:
This bill creates significant new analytical, administrative and regulatory workload for both CEC and CPUC, with ongoing annual costs likely in the high hundreds of thousands of dollars, at least.
- CEC anticipates the need for $656,000 ongoing for three permanent positions to:
- Lead development of rules and guidelines for load shift credit accounting, manage data reporting process for retail suppliers and track the state’s progress toward increased load flexibility.
- Facilitate interagency coordination and lead strategy development efforts.
- Evaluate the ability of load flexibility resources to qualify for or reduce a load-serving entity’s resource adequacy obligations.
CEC notes its main funding source, ERPA, faces an ongoing structural deficit and warns it, therefore, may not be an appropriate fund source to support the implementation of this bill.
- The CPUC describes the work this bill creates for it as developing a strategy to reduce distribution infrastructure investments through cost-effective deployment of distributed resources and load shifting; directing IOUs to implement new programs and rate designs and overseeing their implementation; integrating new data into planning processes; and coordinating closely with CEC and CAISO.
The CPUC estimates costs of approximately $1.4 million (Public Utilities Commission Utilities Reimbursement Account), as follows: $911,000 for three permanent senior regulatory analysts and $257,000 for one three-year limited-term administrative law judge, and $480,000 for outside consultants, hardware and staff training, including modeling capacity and updated avoided cost studies.
SUPPORT: (Verified 9/9/25)
350 Humboldt
350 Sacramento
Advanced Energy United
California Efficiency + Demand Management Council
California Energy Storage Alliance
California Solar & Storage Association
Carbon Free Palo Alto
Carbon Free Silicon Valley
Clean Coalition
Climate Action California
Coalition for Community Solar Access
Deploy Action
Menlo Spark
Microgrid Resources Coalition
Natural Resources Defense Council
Nexamp
San Jose Community Energy Advocates
School Energy Coalition
The Climate Center
The Climate Reality Project - Silicon Valley Chapter
OPPOSITION: (Verified 9/9/25)
California Community Choice Association
California Municipal Utilities Association
California Special Districts Association
Marin Clean Energy
Northern California Power Agency
Sacramento Municipal Utility District
Southern California Public Power Authority
ARGUMENTS IN SUPPORT: The Natural Resources Defense Council states:
…[SB 541] would reinforce and smooth the implementation of the state’s load flexibility goal, while requiring cost-effectiveness and strategic integration. Increasing cost-effective load flexibility on the grid can be beneficial because it allows for more effective use of electrified buildings and vehicles, reduces the electricity infrastructure costs needed to support economic development, and increases the reliability and resiliency of the grid. …SB 541 applies a reasonable next step toward cost-effectively and strategically increasing and investing in load-shifting resources to support a more resilient, zero-emission electricity grid.
ARGUMENTS IN OPPOSITION: According to the Southern California Public Power Association (SCPPA):
SCPPA Members believe load shifting is an important strategy for maximizing the efficiency of their customers’ infrastructure investments. Elements of SB 541, such as the direction for the Energy Commission to develop metrics to evaluate the effectiveness of load-shifting and to evaluate barriers implementation, could be useful starting points for POUs to refine their own analyses as POUs evaluate and pursue solutions that work best for their service territories. …SB 541’s marginal increase in specificity of the CEC’s ongoing load-shifting analyses would create a significant increase in the reporting burden for POUs. SCPPA is appreciative of the changes made to the bill thus far, however the bill could be further improved by removing the estimation of load-shifting capacity for each retail supplier.
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
9/12/25 20:41:21
**** END ****
SENATE THIRD READING
STR Bill Id:SB 541
Author:(Becker)
As Amended Ver:September 5, 2025
Majority vote
SUMMARY
Directs the California Energy Commission (CEC) to undertake several actions to promote shifting electricity use (‘load’) away from peak periods to times of lower demand, a practice generally known as "load shifting."
Major Provisions
- Directs the CEC, as part of its regularly published Integrated Energy Policy Report (IEPR), and in consultation with the California Public Utilities Commission (CPUC) and the California Independent System Operator (CAISO), to take various actions to determine, among other things, the cost-effectiveness, potential of, and barriers to, non-emergency load shifting.
- Directs the CEC, by July 1, 2028, and every other year thereafter, to analyze and publish on its website the amount of load shifting each retail supplier of electricity achieved in the prior calendar year.
- Requires the CEC to establish standards for estimating the amount of load shifting for each type of load flexibility effort undertaken by retail suppliers. Requires periodic updates of these standards.
- Specifies that the provisions of the bill do not impose obligations or mandate procurement of load-shifting technologies.
- Defines "load shifting" to explicitly exclude backup generators powered by fossil fuels, or any other generation resource that is not renewable or zero-carbon.
COMMENTS
"Load shifting" generally means moving electricity use ("load") from periods of high demand to times of lower demand. California relies on load shifting to support both electric reliability and clean energy goals. A common example is time-varying rates: many utilities charge higher prices during peak hours—for instance, 4:00 to 8:00 p.m. in summer—when demand is expected to be highest. Customers are encouraged to adjust their usage in response, shifting activities to cheaper, off-peak hours. When effective, these mechanisms ease stress on the grid, reduce the cost of power generation, and cut pollution, since the resources used to meet peak demand are often the most expensive and most polluting.
As mandated by statute (SB 846, Dodd, Chapter 239, Statutes of 2022), the CEC developed a goal for shifting load to reduce net peak electrical demand (the greatest amount of demand for electricity, minus electricity supplied by wind and solar resources) and policies to increase demand response and load shifting. To do so, CEC issued the "SB 846 Load Shift Goal Commission Report" in May of 2023. The CEC set a system-wide load-shift goal of 7,000 megawatts (MW), which CEC described as “aspirational but achievable with robust policy support." (For reference, typical peak summertime demand on the electrical system managed by CAISO is about 45,000 to 50,000 MW.)
The CEC cautioned in its SB 846 Report that the proposed statewide load-shifting goal is not meant to imply that California should pursue targets without first evaluating the cost-effectiveness of the specific resources or programs involved. The goal is set at the statewide level and was not intended to establish sub-goals for individual program types, sectors, or jurisdictions.
This bill does require the CEC to evaluate the cost-effectiveness of specific load-shifting programs and other types of load-shifting interventions. However, it also requires the CEC to publish – on a supplier-by-supplier basis – the amount of load shifting each retail electricity provider achieved in the prior year, relative to its load-shifting potential, as determined by the CEC. According to the author, this is not about setting individual sub-goals for each utility or similar entity, but about creating accountability for electricity suppliers to pursue cost-effective load shifting. Some electric utilities dispute this, with the California Municipal Utilities Association noting the bill creates "significant burdens…and could undermine their [the utilities’] ability to develop cost-effective, locally tailored load management strategies."
According to the Author
According to the author: "We need to improve electricity affordability while also providing power faster to support new housing, EV chargers, data centers, and other economic growth. The good news is that our electricity system has a lot of spare capacity – 99% of the time. It is only a few peak hours, less than 100 per year, where we struggle to meet demand. A recent study from Duke estimated that CA has almost 6000 MW of capacity for new load outside of the top 1% of hours. That's enough to power 3M homes or 30 massive new data centers. If we can reduce load during those peak hours, by shifting some demand to other times, then we can unlock all that spare capacity to support housing and EVs and data centers much faster, and at much lower cost, than building more capacity to serve even higher peaks. SB 541 attempts to create accountability for our electricity suppliers to seek cost-effective load shifting by having the CEC divide its 7000 MW load shift goal among suppliers and track progress. It also directs the PUC to create more transparency about where load-shifting would help reduce constraints in the distribution system and to require and enable IOUs to develop load flexibility in constrained distribution areas more proactively so that we can support new loads faster and get more out of the poles and wires we've already paid for."
Arguments in Support
The bill is supported by clean energy industry groups and associations and the Natural Resources Defense Council, the latter of which expresses support for load-shifting, in general, and asserts the bill "strengthens implementation of the state's load shifting target, which will ease the deployment of zero-emission energy and create a more resilient electricity grid."
Arguments in Opposition
The bill is opposed by load-serving entities, such as public and private electricity providers. The California Community Choice Association (CalCCA) asserts that the gap between load-shifting potential and actual load shifting "is not due to a lack of motivation or effort – it is due to technical barriers, regulatory uncertainty, and market dynamics such as voluntary customer participation."
FISCAL COMMENTS
According to the Assembly Committee on Appropriations, this bill creates significant new analytical, administrative, and regulatory workload for the CEC, with ongoing annual costs likely in the high hundreds of thousands of dollars, at least. The Appropriations Committee also notes the CEC's main funding source faces an ongoing structural deficit. Finally this bill may also create potentially significant costs for the CPUC to consult with the CEC.
VOTES
SENATE FLOOR: 27-10-3
YES: Allen, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Cortese, Durazo, Gonzalez, Grayson, Laird, Limón, McGuire, McNerney, Menjivar, Padilla, Pérez, Rubio, Smallwood-Cuevas, Stern, Umberg, Wahab, Weber Pierson, Wiener
NO: Alvarado-Gil, Choi, Dahle, Grove, Jones, Niello, Ochoa Bogh, Seyarto, Strickland, Valladares
ABS, ABST OR NV: Hurtado, Reyes, Richardson
ASM UTILITIES AND ENERGY: 13-2-3
YES: Petrie-Norris, Boerner, Calderon, Mark González, Harabedian, Hart, Irwin, Kalra, Papan, Rogers, Schiavo, Schultz, Zbur
NO: Davies, Ta
ABS, ABST OR NV: Patterson, Chen, Wallis
ASM APPROPRIATIONS: 11-4-0
YES: Wicks, Arambula, Calderon, Caloza, Elhawary, Fong, Mark González, Ahrens, Pacheco, Pellerin, Solache
NO: Sanchez, Dixon, Ta, Tangipa
UPDATED
VERSION: September 5, 2025
CONSULTANT: Kristen Koenig /Laura Shybut / U. & E. / (916) 319-2083 FN: 0001681
SENATE THIRD READING
STR Bill Id:SB 541
Author:(Becker)
As Amended Ver:September 02, 2025
Majority vote
SUMMARY
Directs the California Energy Commission (CEC) to undertake several actions to promote shifting electricity use ('load') away from peak periods to times of lower demand, a practice generally known as "load shifting."
Major Provisions
- Directs the CEC, as part of its regularly published Integrated Energy Policy Report (IEPR), and in consultation with the California Public Utilities Commission (CPUC) and the California Independent System Operator (CAISO), to take various actions to determine, among other things, the cost-effectiveness, potential of, and barriers to, non-emergency load shifting.
- Directs the CEC, by July 1, 2028, and every other year thereafter, to analyze and publish on its website the amount of load shifting each retail supplier of electricity achieved in the prior calendar year.
- Requires the CEC to establish standards for estimating the amount of load shifting for each type of load flexibility effort undertaken by retail suppliers. Requires periodic updates of these standards.
- Specifies that the provisions of the bill do not impose obligations or mandate procurement of load-shifting technologies.
COMMENTS
"Load shifting" generally means moving electricity use ("load") from periods of high demand to times of lower demand. California relies on load shifting to support both electric reliability and clean energy goals. A common example is time-varying rates: many utilities charge higher prices during peak hours—for instance, 4:00 to 8:00 p.m. in summer—when demand is expected to be highest. Customers are encouraged to adjust their usage in response, shifting activities to cheaper, off-peak hours. When effective, these mechanisms ease stress on the grid, reduce the cost of power generation, and cut pollution, since the resources used to meet peak demand are often the most expensive and most polluting.
As mandated by statute (SB 846, Dodd, Chapter 239, Statutes of 2022), the CEC developed a goal for shifting load to reduce net peak electrical demand (the greatest amount of demand for electricity, minus electricity supplied by wind and solar resources) and policies to increase demand response and load shifting. To do so, CEC issued the "SB 846 Load Shift Goal Commission Report" in May of 2023. The CEC set a system-wide load-shift goal of 7,000 megawatts (MW), which CEC described as "aspirational but achievable with robust policy support." (For reference, typical peak summertime demand on the electrical system managed by CAISO is about 45,000 to 50,000 MW.)
The CEC cautioned in its SB 846 Report that the proposed statewide load-shifting goal is not meant to imply that California should pursue targets without first evaluating the cost-effectiveness of the specific resources or programs involved. The goal is set at the statewide level and was not intended to establish sub-goals for individual program types, sectors, or jurisdictions.
This bill does require the CEC to evaluate the cost-effectiveness of specific load-shifting resources and programs. However, it also requires the CEC to publish – on a supplier-by-supplier basis – the amount of load shifting each retail electricity provider achieved in the prior year, relative to its load-shifting potential, as determined by the CEC. According to the author, this is not about setting individual sub-goals for each utility or similar entity, but about creating accountability for electricity suppliers to pursue cost-effective load shifting. Some electric utilities dispute this, with the California Municipal Utilities Association noting the bill creates "significant burdens…and could undermine their [the utilities'] ability to develop cost-effective, locally tailored load management strategies."
According to the Author
According to the author: "We need to improve electricity affordability while also providing power faster to support new housing, EV chargers, data centers, and other economic growth. The good news is that our electricity system has a lot of spare capacity – 99% of the time. It is only a few peak hours, less than 100 per year, where we struggle to meet demand. A recent study from Duke estimated that CA has almost 6000 MW of capacity for new load outside of the top 1% of hours. That's enough to power 3M homes or 30 massive new data centers. If we can reduce load during those peak hours, by shifting some demand to other times, then we can unlock all that spare capacity to support housing and EVs and data centers much faster, and at much lower cost, than building more capacity to serve even higher peaks. SB 541 attempts to create accountability for our electricity suppliers to seek cost-effective load shifting by having the CEC divide its 7000 MW load shift goal among suppliers and track progress. It also directs the PUC to create more transparency about where load-shifting would help reduce constraints in the distribution system and to require and enable IOUs to develop load flexibility in constrained distribution areas more proactively so that we can support new loads faster and get more out of the poles and wires we've already paid for."
Arguments in Support
The bill is supported by clean energy industry groups and associations and the Natural Resources Defense Council, the latter of which expresses support for load-shifting, in general, and asserts the bill "strengthens implementation of the state's load shifting target, which will ease the deployment of zero-emission energy and create a more resilient electricity grid."
Arguments in Opposition
The bill is opposed by load-serving entities, such as public and private electricity providers. The California Community Choice Association (CalCCA) asserts that the gap between load-shifting potential and actual load shifting "is not due to a lack of motivation or effort – it is due to technical barriers, regulatory uncertainty, and market dynamics such as voluntary customer participation."
FISCAL COMMENTS
According to the Assembly Committee on Appropriations, this bill creates significant new analytical, administrative, and regulatory workload for the CEC, with ongoing annual costs likely in the high hundreds of thousands of dollars, at least. The Appropriations Committee also notes the CEC's main funding source faces an ongoing structural deficit. Finally this bill may also create potentially significant costs for the CPUC to consult with the CEC.
VOTES
SENATE FLOOR: 27-10-3
YES: Allen, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Cortese, Durazo, Gonzalez, Grayson, Laird, Limón, McGuire, McNerney, Menjivar, Padilla, Pérez, Rubio, Smallwood-Cuevas, Stern, Umberg, Wahab, Weber Pierson, Wiener
NO: Alvarado-Gil, Choi, Dahle, Grove, Jones, Niello, Ochoa Bogh, Seyarto, Strickland, Valladares
ABS, ABST OR NV: Hurtado, Reyes, Richardson
ASM UTILITIES AND ENERGY: 13-2-3
YES: Petrie-Norris, Boerner, Calderon, Mark González, Harabedian, Hart, Irwin, Kalra, Papan, Rogers, Schiavo, Schultz, Zbur
NO: Davies, Ta
ABS, ABST OR NV: Patterson, Chen, Wallis
ASM APPROPRIATIONS: 11-4-0
YES: Wicks, Arambula, Calderon, Caloza, Elhawary, Fong, Mark González, Ahrens, Pacheco, Pellerin, Solache
NO: Sanchez, Dixon, Ta, Tangipa
UPDATED
VERSION: September 02, 2025
CONSULTANT: Laura Shybut / U. & E. / (916) 319-2083 FN: 0001452
Date of Hearing: August 20, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 541
Author:(Becker) – As Amended Ver:July 17, 2025
Policy Committee: | Utilities and Energy | Vote: | 13 - 2 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill requires a number of analytical and regulatory actions to encourage the shift of electricity demand (referred to as “load”) from periods of peak demand to periods of lesser demand, generally referred to as “load shifting.”
Specifically, this bill, among many other things:
- Directs the California Energy Commission (CEC), as part of its regularly published Integrated Energy Policy Report (IEPR), and in consultation with the California Public Utilities Commission (CPUC) and the California Independent System Operator (CAISO), as directed, to take various actions to determine, among other things, the cost-effectiveness and potential of, and barriers to, non-emergency load shifting.
- Directs the CEC, by January 1, 2028, and every other year thereafter, to analyze and publish on its website the amount of load shifting each retail supplier of electricity achieved in the prior calendar year and the amount of load shifting each retail supplier is aiming to achieve in future years in comparison to each retail supplier’s load-shifting potential, as determined by CEC.
- By January 1, 2028, requires the CPUC to develop a strategy to reduce the total distribution infrastructure investments required to meet long-term electricity load growth by enabling large electrical corporations (IOUs) to leverage, where cost-effective, distributed resources and load shifting to increase the utilization of existing distribution and transmission infrastructure, increase the effective load-hosting capacity of existing distribution and transmission infrastructure or provide bridging solutions to enable faster energization of new loads.
- In support of the strategy described above, requires the CPUC to require each IOU to (a) make data available to the public that quantifies the potential for increased utilization of segments of its distribution grid by reducing peak load, as specified, and (b) implement programs, rate designs or other incentives identified by the CPUC to enable the development of cost-effective load-shifting capacity or other peak demand reduction in constrained distribution areas.
- Requires each IOU to consider available load-shifting capacity or other peak demand reduction in its annual distribution system planning and to rely on this capacity or demand reduction if certain conditions are met.
FISCAL EFFECT:
This bill creates significant new analytical, administrative and regulatory workload for both CEC and CPUC, with ongoing annual costs likely in the high hundreds of thousands of dollars, at least.
- CEC anticipates the need for $656,000 ongoing for three permanent positions to:
- Lead development of rules and guidelines for load shift credit accounting, manage data reporting process for retail suppliers and track the state’s progress toward increased load flexibility.
- Facilitate interagency coordination and lead strategy development efforts.
- Evaluate the ability of load flexibility resources to qualify for or reduce a load-serving entity’s resource adequacy obligations.
CEC notes its main funding source, ERPA, faces an ongoing structural deficit and warns it, therefore, may not be an appropriate fund source to support the implementation of this bill.
- The CPUC describes the work this bill creates for it as developing a strategy to reduce distribution infrastructure investments through cost-effective deployment of distributed resources and load shifting; directing IOUs to implement new programs and rate designs and overseeing their implementation; integrating new data into planning processes; and coordinating closely with CEC and CAISO.
The CPUC estimates costs of approximately $1.4 million (Public Utilities Commission Utilities Reimbursement Account), as follows: $911,000 for three permanent senior regulatory analysts and $257,000 for one three-year limited-term administrative law judge, and $480,000 for outside consultants, hardware and staff training, including modeling capacity and updated avoided cost studies.
COMMENTS:
- Purpose. The author intends this bill to shift electric load from times of peak demand to times of lesser demand, thereby making more efficient and more cost-effective use of the electricity transmission and distribution systems. The result, the author asserts, will support “housing and EVs and data centers much faster, and at much lower cost, than building more capacity to serve even higher peaks.”
- Background. Load-shifting refers, very generally, to the movement of demand for electricity (“load”) from a period of high demand to a period of low demand. The state relies on load shifting to further the state’s electric reliability and clean energy goals. As one simple example, many of the state’s electrical utilities offer customers rates for electricity that vary with the time of day. Under such time-varying pricing, the utility charges higher electricity prices during the hours of the day—4:00 p.m. to 8:00 p.m. in the summer months, for example—for which the utility anticipates relatively higher demand for electricity. The hoped for result is that customers will respond to these price signals and put off uses of electricity to hours when electricity costs and demand are lower. Such load-shifting mechanisms, if successful, reduce stress on the electrical system. The mechanisms may also lower both the cost of generating electricity and the pollutants produced by it, since the energy resources used during times of highest demand also tend to be the most expensive and the dirtiest.
In keeping with state law, CEC developed a goal for shifting load to reduce net peak electrical demand (the greatest amount of demand for electricity, minus electricity supplied by wind and solar resources) and policies to increase demand response and load shifting. To do so, CEC issued the “SB 846 Load Shift Goal Commission Report” in May of 2023. The CEC set a system-wide load-shift goal of 7,000 megawatts (MW), which CEC described as “aspirational but achievable with robust policy support.” (For reference, typical peak summertime demand on the electrical system managed by CAISO is about 45,000 to 50,000 MW.) As noted in other committee analyses of this bill, CEC cautioned in the report:
The proposed goal is not intended to suggest that the state should pursue these targets without the evaluation of the cost-effectiveness of specific resources or programs that would contribute to the goal…The load-shift goal is set at the statewide level and does not intend to set subgoals for specific program types, sectors, or jurisdictions.
This bill, among other things, directs CEC publish the amount of load shifting each retail supplier of electricity achieved in the prior calendar year and the amount of load shifting each retail supplier is aiming to achieve in future years in comparison to each retail supplier’s load-shifting potential, as determined by CEC. The author describes this not as setting load-shifting subgoals for each electric utility and similar such entity. Rather, the author characterizes the bill as attempting to “create accountability for our electricity suppliers to seek cost-effective load shifting.”
- Support and Opposition. The bill is supported by clean energy industry groups and associations and the Natural Resources Defense Council, the latter of which expresses support for load-shifting, in general, and asserts the bill “strengthens implementation of the state’s load shifting target, which will ease the deployment of zero-emission energy and create a more resilient electricity grid.”
The bill is opposed by load serving entities.
The statewide and regional associations representing the state’s municipal utilities (also known as publicly owned utilities, or POUs), describe the bill as potentially “creating significant burdens for POUs and could undermine their ability to develop cost-effective, locally tailored load management strategies.” They go on to write:
POUs are governed by locally elected or appointed boards and are not subject to California Public Utilities Commission (CPUC) jurisdiction. This local governance structure allows POUs to design demand management programs that are cost-effective, community-driven, and responsive to regional needs. SB 541 risks undermining this framework…While load shifting is important, we don’t believe it is efficient or cost-effective to require public utilities to achieve a load shifting target that may not be aligned with a public utility's own priorities and cost-effective approaches to achieve load shifting.
The California Community Choice Association (CalCCA) similarly opposes the bill, asserting that the gap between load-shifting potential and actual load shifting “is not due to a lack of motivation or effort – it is due to technical barriers, regulatory uncertainty, and market dynamics such as voluntary customer participation.” CalCCA warns this bill:
would impose significant additional work on [CEC] staff, at either an increased cost or at the expense of existing Commission workload, without delivering any benefit or helpful analysis. Given that the state is facing an electric affordability crisis and the CEC’s main operating fund, the Energy Resources Programs Account (ERPA) is facing a structural deficit, CalCCA does not believe the CEC should be assigned a significant body of new work that will not provide any affordability or climate benefits.
Similarly, the state’s three largest IOUs—Pacific Gas and Electric Company, San Diego Gas & Electric Company and Southern California Edison Company—also oppose the bill, unless it is amended, and generally see no need for it, though they affirm their commitment to supporting distributed energy resources and load-shifting goals.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: July 16, 2025
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
SBPCA Bill Id:SB 541
Author:(Becker) – As Amended Ver:June 26, 2025
SENATE VOTE: 27-10
SUBJECT: Electricity: load shifting: distributed resources
SUMMARY: Requires the California Energy Commission (CEC) and California Public Utilities Commission (CPUC) to coordinate and implement strategies that increase load-shifting capacity, improve grid efficiency, and align distribution system planning with statewide energy goals. The CEC must allocate load-shifting targets to retail electricity suppliers, standardize measurement methods, identify implementation barriers, and determine the value of demand reduction by time and location. The CPUC must ensure large utilities use distributed energy resources to avoid costly infrastructure investments, share detailed grid data, implement incentive programs, and balance third-party participation with utility-led initiatives in load flexibility markets.
Specifically, this bill:
- Requires the CEC, as part of each Integrated Energy Policy Report (IEPR), to divide the load shifting needed to reach the load-shifting goal required by Public Resources Code §25302, including biennial adjustments to the goal, to each retail supplier, excluding load shifting provided by emergency programs.
- Requires the CEC, on or before July 1, 2028, and biennially thereafter, to evaluate and publish the amount of load shifting that each retail supplier achieved in the prior calendar year, and the amount of load shifting that each retail supplier is expected to achieve in future years, in comparison to the load shifting allocated to the retail supplier.
- Requires the CEC to establish standards for estimating the amount of load shifting that has been, or will be, achieved by each type of load flexibility effort that retail suppliers undertake.
- Requires the CEC, in consultation with the CPUC and CAISO, to identify and evaluate barriers to effectively implement load-shifting strategies and to establish a location-based avoided cost metric that estimates the value of demand reduction at different times and locations.
- Defines “retail seller” to mean an electrical corporation, community choice aggregator (CCA), electric service provider (ESP), or local electric publicly owned utility (POU) and excludes an electrical corporation with 60,000 or fewer customer accounts or a retail supplier with an annual electrical demand of less than 1,000 gigawatt-hours (GWh).
- Requires the CPUC On or before January 1, 2028 to develop a strategy to leverage distributed resources and load-shifting to increase the utilization of existing distribution and transmission infrastructure, increase the effective load-hosting capacity of existing distribution and transmission infrastructure, provide bridging solutions to enable faster energization of new loads, and reduce the total distribution infrastructure investment required to meet long-term electricity load growth.
- Requires the CPUC to mandate that each large electrical corporation, as part of their integration capacity analysis data or a successor policy, to make data available to the public that quantifies the potential for increased utilization of segments of its distribution grid by reducing peak load, including all of the following:
- A capacity utilization metric that measures the total energy delivered over a distribution segment during a period of time divided by the maximum energy that could have been delivered according to that distribution segment’s maximum capacity.
- An off-peak load-hosting capacity metric that estimates the capacity of a distribution segment to support new loads outside of the 1 percent of hours with the highest peak load annually for that distribution segment, or data providing a similar quantification of off-peak capacity, as determined by the commission.
- The location and boundaries of constrained distribution areas with sufficient detail to allow third parties to identify customer locations where distributed resources could benefit the constrained distribution area.
- Requires the CPUC to direct each large electrical corporation to implement programs, rate designs, or other incentives to encourage the development of load-shifting capacity or other peak demand reduction in constrained distribution areas, prioritizing the following goals:
- Improving capacity utilization and expanding the effective capacity of the constrained distribution area before specific electrical grid upgrade needs have been identified;
- Establishing an efficient process for large electrical corporations to acquire load-shifting capacity in a constrained distribution area.
- Accommodating the need for locational and temporal specificity while not creating undue complexity in implementation.
- Providing adequate incentives and a sufficiently long minimum contract period for the use and compensation of distributed resources to encourage investment.
- Establishing a customer consent-based process for up-front and ongoing access to customer data that is secure, consistent, not overly burdensome, and sufficient to identify eligible sites and operate in response to dispatch or economic signals.
- Allowing participation by all customer classes and by both bundled and unbundled customers.
- Requires the CPUC to ensure that programs operated by, or investments made by, large electrical corporations for load-shifting capacity do not interfere with the ability of third parties to develop load-shifting capacity that can be offered to other load-serving entities (LSEs) or to wholesale energy markets.
- Requires the CPUC to consider how, and under what conditions, the same distributed resources can provide load flexibility for, and be compensated for, meeting both distribution grid needs and load modification or resource adequacy needs. This includes doing the following:
- Authorize large electrical corporations to make investments in load-shifting capacity in a constrained distribution area that include the ability for the large electrical corporation to control the timing of the use of the load-shifting capacity
- Authorize large electrical corporations to develop tariffs or fee structures to charge a large new load seeking energization for the cost of acquiring load-shifting capacity or other peak load reductions from other customers in order to allow or accelerate the energization of that large new load.
- Requires the CPUC to ensure that the large electrical corporation has made reasonable efforts to increase cost-effective load shifting or other types of peak demand reduction in order to expand the effective capacity and increase the utilization of that segment of the distribution grid, before determining that an investment by a large electrical corporation to increase distribution system capacity is just and reasonable.
- Requires the CPUC to mandate each large electrical corporation to provide relevant distribution planning data to the CEC, and to consult with the CEC to support alignment between distribution-level planning and the CEC’s systemwide forecasting and planning.
EXISTING LAW:
- Requires that all rates for any service or product charged by an electrical corporation be just and reasonable. (Public Utilities Code § 451)
- Requires the CPUC to consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity. (Public Utilities Code § 454.52(a)(3))
- Requires each customer with distributed energy resources (DERs), as specified, to participate in real-time metering and pricing programs; and requires the CPUC to adopt a real-time pricing tariff by December 31, 2001, to serve these customers. (Public Utilities Code § 353.3)
- Permits IOUs, with approval of the CPUC, to offer residential customers the option of receiving electric service pursuant to “time-variant pricing,” which includes time-of-use rates (TOU), critical peak-pricing, and real-time pricing. Beginning in 2018, an IOU can employ default TOU pricing as long as the customer is provided with a rate comparison for one year of all billing options (commonly referred to as shadow-billing) and associated customer education. Subsequently, the customer must be guaranteed for one year that the total amount paid for electric service will not exceed the amount that would have been due under the customer’s previous rate schedule (commonly referred to as bill protection). (Public Utilities Code § 745)
- Requires the governing board of a local publicly owned electric utility to consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each utility meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity. (Public Utilities Code § 9621)
- Mandates the California Air Resources Board (CARB), in consultation with the CEC and the CPUC, to require battery electric vehicles to be bidirectional-capable, allowing EVs to support the grid. (Health Safety Code § 44269)
- Directed the CEC to establish a statewide goal for load shifting and to adjust the goal in each biennial integrated energy policy report (IEPR). (Public Resources Code § 25302.7)
- Allows funds from the safe drinking water, wildfire prevention, drought preparedness and clean air bond to be spent on zero-emissions distributed energy backup assets, virtual power plants, and demand side grid support. (Public Resources Code § 94530)
FISCAL EFFECT: According to the Senate Appropriations Committee, ongoing costs likely in the hundreds of thousands of dollars annually for the CEC (Energy Resources Program Account [ERPA] or other fund source) and the CPUC (ratepayer funds) to the implement the provisions of this bill.
CONSUMER COST IMPACTS: Unknown
BACKGROUND:
SB 846 (Dodd, Chapter 239, Statutes of 2022) Load Shift Goal – In May 2023, the CEC issued the Senate Bill 846 Load-Shift Goal Report. The CEC developed a statewide load-shift goal of 7,000 megawatts (MW) for 2030. According to the report, CEC staff analyzed the statewide load-shift potential using the following methodological steps:
- Develop hourly gross load estimates using annual consumption forecasts from the Integrated Energy Policy Report (IEPR) and hourly load shapes provided by the Lawrence Berkeley National Lab (LBNL) Load model from the LBNL Potential Study.
- Develop hourly system net load estimates and identify net peak period from the LBNL Potential Study and CAISO data.
- Develop potential DR impacts for net peak reduction within two categories: dynamic pricing and event-based DR.
The report estimated that, as of 2022, there was an estimated 3,100-3,600 MW of load shift currently in the state. In order to reach the 2030 goal, the CEC identified three load shift interventions. First intervention is load-modifying demand flexibility resource potential (3,000 MW). The most common type of load modifying intervention is time of use rates. A second load shift intervention is resource planning and procurement of load flexibility resources. This includes supply-side demand response that participates in the CAISO as economic or reliability demand response. The final intervention is incremental and emergency load-flexibility resource programs, which increase resource availability during extreme events. This includes the Emergency Load Reduction Program and the Demand Side Grid Support program which can be activated during emergency grid events. The report also includes 18 policy recommendations to support deployment of the three categories of interventions.
Within the report, the CEC cautions that this is an aspirational statewide goal based on economic potential. The report states:
Further analysis is needed to determine the cost-effectiveness of specific load flexibility resources and programs. The proposed goal is not intended to suggest that the state should pursue these targets without the evaluation of the cost-effectiveness of specific resources or programs that would contribute to the goal… The load-shift goal is set at the statewide level and does not intend to set subgoals for specific program types, sectors, or jurisdictions. [1]
Distribution Investment Deferral Framework and Incentivizing DERs – In 2018, the CPUC established the Distribution Investment Deferral Framework (DIDF). The goal of DIDF was to for IOUs to identify low-cost opportunities for Distributed Energy Resources (DERs) to defer traditional capital investments, and for the IOUs to pursue an open market solicitation for DER solutions. The DIDF process has focused on non-wired alternatives to distribution investments at specific grid locations. The CPUC adopted various metrics for identifying and selecting these opportunities, including metrics for cost-effectiveness, forecast certainty, and market assessment. The DIDF process also provided information on the actual cost of distribution system upgrades and the process of distribution planning to the CPUC and the wider public.
Although it has been revised several times, DIDF has not done well in deferring traditional wires investments. It may be that DIDF is structurally flawed, however, the CPUC has assessed that consistent lackluster results show that it can be difficult and expensive to defer investments through DERs. The CPUC has reported that non-wires alternatives can fail for many reasons including changing project needs and locations, barriers to DER deployment such as interconnection delays, uncertainty in the contracting process, and developer failure. DIDF has been considered ineffective at increasing DER implementation, but has provided transparency into IOU distribution planning.[2]
COMMENTS:
- Author’s Statement. According to the author: “We need to improve electricity affordability while also providing power faster to support new housing, EV chargers, data centers, and other economic growth. The good news is that our electricity system has a lot of spare capacity – 99% of the time. It is only a few peak hours, less than 100 per year, where we struggle to meet demand. A recent study from Duke estimated that CA has almost 6000 MW of capacity for new load outside of the top 1% of hours. That’s enough to power 3M homes or 30 massive new data centers. If we can reduce load during those peak hours, by shifting some demand to other times, then we can unlock all that spare capacity to support housing and EVs and data centers much faster, and at much lower cost, than building more capacity to serve even higher peaks. SB 541 attempts to create accountability for our electricity suppliers to seek cost-effective load shifting by having the CEC divide its 7000 MW load shift goal among suppliers and track progress. It also directs the PUC to create more transparency about where load-shifting would help reduce constraints in the distribution system and to require and enable IOUs to develop load flexibility in constrained distribution areas more proactively so that we can support new loads faster and get more out of the poles and wires we’ve already paid for.”
- Purpose of the Bill. As mandated by the legislature, the CEC has identified a load-shift goal of 7000 MW and has proposed potential strategies to reach this load-shift goal. The CPUC, the CEC and CAISO have worked to promote distributed energy resources for the purposes of achieving this load-shift and to defer grid investment. However, programs such as DIDF, as described above, have neither shown the investment needed to meet the CEC load shift goal by 2030 nor deferred grid investment. The goal of the bill is to incentivize greater investment by energy retailers toward achieving the state’s load-shift goal by increasing transparency in current load shifting programs. In addition, the bill mandates the development of a strategy to incentivize using distributed resources to increase the utilization of exiting distribution and transmission infrastructure.
- Dividing the CEC’s load shift goal across retail suppliers. When generating the 2022 load-shift goal, as mandated in SB 846, the CEC explicitly noted that the goal is not intended to set subgoals for specific program types, sectors, or jurisdictions. Despite this direction from the CEC, this bill mandates the CEC to divide the load-shift goal across retail suppliers. However, the bill also states that subdivision is not intended to impose a binding obligation or otherwise mandate the procurement of load-shifting technologies by the retail suppliers. These two requirements in the bill – that 1) the CEC divide the load-shift goal across the various LSEs while 2) not imposing any new procurement obligation on them – seem to internally conflict. How are the LSEs meant to meet their individualized goals without establishing new programs or procurement? What is the function of the CEC assigning targets to each LSE if those targets aren’t intended to be reached? At minimum, the expectation on LSEs from these provisions is confusing, and has led to many utilities, especially the POUs, to oppose this measure. To clarify the desire for increased transparency but also make sure that the bill does not mandate procurement, the committee recommends striking the language that divides the load-shift goal. Rather, the bill will retain the requirement that the CEC estimate each retail supplier’s load-shifting potential, and biennially report how much load shifting the suppliers have achieved relative to that potential.
- Cost Effectiveness. This bill asserts the foundational premise that demand response technologies and tools are wholly beneficial. A reflection of this perspective is noted in the sixth finding, “load flexibility to reduce peak load is a cost-saving opportunity.” While demand response tools are often among the fastest and most affordable to deploy – and can help maximize grid efficiency and give customers greater control over their energy use – they often face practical challenges that limit their cost-effectiveness and overall value to the grid. The current language of this bill misses opportunities to provide this perspective, and instead drives LSEs toward achieving the load-shift goal without consideration of cost-effectiveness or feasibility. The author has noted this is not their intent. To address these concerns, the committee recommends directing the CEC to analyze the cost-effectiveness of specific load flexibility programs and tools in the next IEPR; to include consideration of cost-effectiveness of these tools and programs as well as specific limitations for their deployment for each LSE when the CEC determines the LSE’s load-shifting potential in Section 2 (PRC § 25302.7 (b)(1)); and to have the CPUC consider cost effectiveness in determining their load-shifting strategy in Section 3 (PUC § 769.1).
- Not Repeating Past Mistakes. California is experiencing a transformational time in how electricity is generated, distributed and consumed. One of the key factors underlying this change is the emphasis on demand response programs and new and emerging load-shifting strategies. California’s utilities have effectively used demand response technologies – smart thermostats, automated control, aggregation platforms, and virtual power plants – to actively manage grid demand, prevent outages, and integrate renewable energy. For instance, Valley Clean Energy’s AgFIT (Agricultural Flexible Irrigation Technology) pilot – launched in May 2022 – helps farmers automate irrigation and shift energy use to low-cost, clean-energy hours.[3] In partnership with Polaris Energy Services and TeMix, the program offers customer incentives of up to $150 per horsepower unit to install irrigation automation alongside transparent pricing, with electricity costs published a week ahead so farmers can schedule irrigation during cheaper, grid-friendly times. VCE reports participants typically save 10–15% on their electricity bills, shift about 40% of their load away from evening grid peaks, and reduce costs by roughly 30% while helping grid reliability and supporting renewable integration.[4]
However, such co-beneficial outcomes are not always guaranteed. As noted above, the IOUs efforts undertaking the DIDF have not done well, and as a result that program is currently suspended at the CPUC. The IOUs have stated concern that Section 3 of this bill, requiring the CPUC to develop a strategy to increase DER utilization, is a resurrection of the failed DIDF. Given this context, the committee recommends amendments that specify in the legislative intent to apply lessons-learned from past DER efforts; that the CPUC’s strategy in Section 3 (PUC § 769.1) is centered around reducing total distribution infrastructure investment (rather than to leverage DERs); and to allow IOUs to rely on the load-shifting capacity as part of their distribution system planning so long as the IOU is capable of controlling the timing of the resource and the resources is feasible, cost-effective, and reliable.
- Additional Amendments. The committee and author have agreed to a number of clarifying and/or technical amendments to help address the themes throughout the text of the measure of cost-effectiveness, lessons-learned from past programs, and having programs serve overall distribution grid needs. The committee recommends adoption of all of these amendments.
- Related Legislation
AB 44 (Schultz) requires the CEC to create and share methods for adjusting LSEs’ energy demand forecasts. These methods will be based on the use of technologies and programs that reliably reduce or shift electricity use, as agreed upon by the CEC, the CPUC, and the CAISO. Status: Set for hearing in the Senate Committee on Energy, Utilities and Communications on July 15, 2025.
AB 740 (Harabedian) requires the California Energy Commission (CEC), on or before November 1, 2026, to adopt a virtual power plant (VPP) deployment plan. Status: Set for hearing in the Senate Committee on Energy, Utilities and Communications on July 15, 2025.
AB 1117 (Schultz) creates optional, dynamic electricity rates for large investor-owned utility (IOU) customers. These rates would change based on real-time conditions of the electricity grid and market prices. Participation in these dynamic pricing plans would be voluntary. The bill also aims to ensure that adopting these new rates doesn't unfairly shift costs between different customer groups. Status: Set for hearing in the Senate Committee on Energy, Utilities and Communications on July 15, 2025.
- Prior Legislation
SB 1305 (Stern, 2024) would require the CPUC, in coordination with the State Energy Resources Conservation and Development Commission and the Independent System Operator, to take begin a proceeding to determine targets for virtual power plants procurement and require IOUs to report on their progress to meeting these targets. Status: Held in the Senate Committee on Energy, Utility and Communications.
SB 59 (Skinner) authorized CARB, in consultation with the CEC and the CPUC, to require BEVs to be bidirectional-capable if it determines that there is a sufficiently compelling benefit to the BEV operator and the electrical grid. Status: Chapter 765, Statutes of 2024.
AB 205 (Ting) authorized funding and changes in many energy focused programs, including the DSGS Program and appropriated $200 million to the CEC to run the Program. Status: Chapter 61, Statues of 2022.
SB 846 (Dodd) among its many provisions, required the CEC to adopt a load shifting goal to reduce net peak electrical demand. Status: Chapter 239, Statutes of 2022.
SB 49 (Skinner) expands the California Energy Commission’s (CEC) authority to develop standards for appliances to facilitate the deployment of flexible demand technologies. Status: Chapter 697, Statutes of 2019.
AB 3001 (Bonta, 2018), among its provisions, requires the CPUC to offer optional residential and commercial rates that encourages the deployment of flexible electric loads. Status: Died – Assembly Committee on Natural Resources.
AB 327 (Perea), among its many provisions, restructures the rate design for residential electric customers. Status: Chapter 611, Statutes of 2013.
REGISTERED SUPPORT / OPPOSITION:
Support
Advanced Energy United
California Efficiency + Demand Management Council
California Energy Storage Alliance
California Solar & Storage Association
California Solar and Storage Association
Carbon Free Palo Alto
Carbon Free Silicon Valley
Climate Center; the
Coalition for Community Solar Access
Deploy Action
Microgrid Resources Coalition
National Resources Defense Council
Nexamp
Rewiring America
Support If Amended
Ava Community Energy Authority
Coalition of California Utility Employees
Oppose
California Municipal Utilities Association (CMUA)
California Special Districts Association
Imperial Irrigation District
Southern California Public Power Authority (SCPPA)
Oppose Unless Amended
Burbank/burbank Redevelopment Agency; City of
California Community Choice Association
Edison International and Affiliates, Including Southern California Edison
Marin Clean Energy (MCE)
Pacific Gas and Electric Company
San Diego Gas & Electric
Analysis Prepared by: Kristen Koenig & Laura Shybut / U. & E. / (916) 319-2083
CEC, “Commission Report on the SB 846 Load Shift Goal”, May 26, 2023. ↑
CPUC, “Staff Proposal for the High DER Proceeding,” April 5, 2024 ↑
https://valleycleanenergy.org/programs/a-flexible-irrigation-pilot-program-for-agriculture/ ↑
https://valleycleanenergy.org/news/valley-clean-energy-launches-an-innovative-program-for-agricultural-customers-to-reduce-grid-stress-and-save-farmers-money ↑
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 541 |
THIRD READING
Bill No: SB 541
Author: Becker (D), et al.
Amended: 5/23/25
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 13-4, 4/21/25
AYES: Becker, Allen, Archuleta, Arreguín, Ashby, Caballero, Gonzalez, Grayson, Limón, McNerney, Rubio, Stern, Wahab
NOES: Ochoa Bogh, Dahle, Grove, Strickland
SENATE APPROPRIATIONS COMMITTEE: 5-1, 5/23/25
AYES: Caballero, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto
NO VOTE RECORDED: Dahle
SENATE APPROPRIATIONS COMMITTEE: 5-1, 5/23/25
AYES: Caballero, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto
NO VOTE RECORDED: Dahle
SUBJECT: Electricity: load shifting
SOURCE: Author
DIGEST:
This bill requires a number of actions towards achieving a goal for electric load shifting, the concept of shifting or shedding electric load or demand away from times when electricity is expensive, polluting, and scarce.
ANALYSIS:
Existing law:
- Existing law vests the California Public Utilities Commission (CPUC) with regulatory jurisdiction over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) to adopt a biennial integrated energy policy report (IEPR) containing certain information in a specified format. (Public Resources Code §25302)
- Requires the CEC, in consultation with the CPUC, and the California Independent System Operator (CAISO), to adopt a goal for load shifting to reduce net peak electrical demand and adjust this target in each biennial IEPR thereafter. (Public Resources Code §25302.7)
- Requires the CPUC to adopt a process for each load-serving entity (LSE) to file an integrated resource plan (IRP) and a schedule for periodic updates to the plan and to ensure that LSEs, among other things, enhance distribution systems and demand-side energy management. (Public Utilities Code §454.52)
- Requires that all rates for any service or product charged by an electrical corporation must be just and reasonable. (Public Utilities Code §451)
- Authorizes the CPUC to authorize electrical corporations to offer residential customers the option of receiving service on time-variant pricing (time-of-use rates, critical peak-pricing, and real-time pricing). Prohibits the CPUC from establishing a mandatory default time-variant pricing tariff for residential customers, except for default time-of-use rates. Requires the CPUC to ensure that any time-of-use rate schedule does not cause unreasonable hardship for senior citizens or economically vulnerable customers in hot climate zones. (Public Utilities Code §745)
This bill:
- Requires the CEC, as part of each IEPR, to allocate the load shifting needed to reach the load-shifting goal required by Public Resources Code §25302, including biennial adjustments to the goal, to each retail supplier, as defined, based on the CEC’s estimate of its load-shifting potential, including consideration of the relative share of statewide load of each retail supplier, and other relevant factors.
- Requires the CEC, on or before July 1, 2028, and biennially thereafter, to evaluate and publish the amount of load shifting that each retail supplier achieved in the prior calendar year, and the amount of load shifting that each retail supplier is expected to achieve in future years, in comparison to the load shifting allocated to the retail supplier.
- Requires the CEC, in consultation with the CPUC and CAISO, to identify and evaluate barriers to effectively implement load-shifting strategies and to establish a location-based avoided cost metric that estimates the value of demand reduction at different times and locations.
- Defines “retail seller” to mean an electrical corporation, community choice aggregator (CCA), electric service provider (ESP), or local electric publicly owned utility (POU) and excludes an electrical corporation with 60,000 or fewer customer accounts or a retail supplier with an annual electrical demand of less than 1,000 gigawatt-hours (GWh).
Background
A changing electric grid. The electric grid is undergoing tremendous shifts, including transitioning to cleaner (often intermittent) resources (e.g. solar and wind) at a tremendous pace and scale, changing weather conditions/patterns (including more extreme temperature and storms), and switching or substituting energy uses (e.g. transportation and heating from fossil fuels to electricity). After the unexpected rotating outages called by the CAISO in late summer 2020 during west-wide extreme heat event, the Governor and Legislature took several actions to address supply shortages during and in the aftermath of these events. These actions include near term procurement orders and increasing planning reserve margins, billions of dollars from the state general fund to establish the Electricity Strategic Supply Reliability Reserve, and authorizing the extended operations of the state’s sole remaining nuclear power plant. Within the authorizing legislation for the extension of Diablo Canyon nuclear power plant, SB 846 (Dodd, Chapter 239, Statutes of 2022) also required the CEC, in consultation with the CPUC, and CAISO, to adopt a goal for load shifting to reduce net peak electrical demand and to adjust this target in each biennial IEPR.
About load shifting. Load shifting reflects the understanding that when electricity is used can be just as important as how much is used. Load shifting entails beneficially shifting electric load (or demand) away from times when electricity is scarce, expensive, and highly polluting to times when electricity is inexpensive, clean, and plentiful. Load shifting can play an important role in helping to address the challenges on the electric grid by aligning customer demand with the supply of clean energy. Load shifting has the potential to help integrate renewable generation, reduce the strain on the electric grid, and help maintain reliability during extreme events. As electrified load increases, especially from electric vehicles, heat pumps, as well as, further adoption of distributed energy resources (especially from solar and energy storage), the need for investments in grid infrastructure may also rise and the opportunities for load shifting also increase.
CEC SB 846 Load-Shift Goal Report. In May 2023, the CEC issued the report required in SB 846 on establishing a load-shifting goal and informed by the 2020 Lawrence Berkeley National Laboratory report on the Shift Resource through 2030, and other relevant research, as required by the statute. The CEC developed a statewide load-shift goal for 2030 of 7,000 megawatts (MW), including 3,400-3,900 MW of incremental resources. The goal encompasses three categories of load flexibility resources:
- Load-modifying demand flexibility resources (3,000 MW) directly impact the load forecast and resource procurement requirements of LSEs. The most common category is time-varying rates, such as time-of-use or hourly dynamic rates that reflect actual grid conditions.
- Resource planning and procurement load flexibility resources (1,620-1,775 MW) either contributes to meeting Resource Adequacy (RA) requirements or reduces RA requirements as a credit. This category includes supply-side demand response that participates in the CAISO as economic or reliability demand response.
- Incremental and emergency load-flexibility resource programs (1,175 MW) intended to increase resource availability during extreme events and do not contribute to meeting RA requirements. These include the Emergency Load Reduction Program and the Demand Side Grid Support program which can be activated during emergency grid events.
The CEC report cautions the statewide goal is based on economic potential.
Further analysis is needed to determine the cost-effectiveness of specific load flexibility resources and programs. …The proposed goal is not intended to suggest that the state should pursue these targets without the evaluation of the cost-effectiveness of specific resources or programs that would contribute to the goal.
The report also includes 18 policy recommendations to support deployment of the three category of resources.
CEC and CPUC efforts to employ time-varying rates. In addition to the SB 846 report, both the CEC and CPUC are pursuing load flexibility from time-varying rates. The CEC’s Load Management Standard proceeding has directed LSEs to create at least one hourly rate offering, or an equivalent program, by 2027. The MIDAS provides a centralized rate database that customers, developers, and devices can use to access rate information. The Flexible Demand Appliance Standards (FDAS) will provide direction to device manufacturers to enable beneficial load flexibility in response to these rates. In June 2022, the CPUC staff issued a report with a proposed roadmap for hourly dynamic pricing to enable widespread load flexibility, including load shifting, called the California Flexible Unified Signal for Energy (CalFUSE). Subsequently, the CPUC opened a rulemaking, Order Instituting Rulemaking to Advance Demand Flexibility Through Electric Rates (R. 22-07-005), to enable widespread demand flexibility, instead of the historical piecemeal approach. As part of the proceeding the CPUC has directed electric investor-owned utilities (IOUs) to deploy pilot programs to gain learnings and understandings about the effects of dynamic rates.
Integrated Energy Policy Report (IEPR). The IEPR provides a cohesive approach to identifying and solving the state’s pressing energy needs and issues. The report, which is crafted in collaboration with a range of stakeholders, develops and implements energy plans and policies. SB 1389 (Bowen and Sher, Chapter 568, Statutes of 2002) required the CEC to conduct assessments and forecasts of all aspects of energy industry supply, production, transportation, delivery and distribution, demand, and prices. The CEC is then required to use these assessments and forecasts to develop energy policies that conserve resources, protect the environment, ensure energy reliability, enhance the state's economy, and protect public health and safety.” The CEC adopts an IEPR every two years and an update every other year.
Comments
Need for this bill. The author states:
Electrical bills have grown unsustainably, and the state is looking for ways to constrain future cost increases. Electricity system costs (at least for transmission and distribution) are mostly driven by the need to provide reliable power during the periods of highest demand. If utilities can lower their system peak energy demand – by getting customers to adjust thermostats or shift some of their demand to other times of day, for example – then the utilities can serve more demand during off-peak hours (which helps to lower rates) while avoiding new investments to add to peak capacity. The CEC’s “Load-Shift Goal Report” set a goal of achieving 7000 MW of cost-effective load shifting by 2030 (with 3400-3900 MW of that not yet being captured). While the CEC’s goal has shed light on this large cost-saving opportunity, more is needed to push our electricity suppliers to capture those savings and make load-flexibility a routine part of their system planning and energy procurement efforts.
Impacts to ratepayers. As the supporters of this bill note, the increasing costs of utility bills, along with anticipated expansion of new resources and the electric grid, necessitate ensuring that electric grid investments are judicious and prudent. Load shifting provides a tool with the potential to better optimize electric grid resources while shifting load during times when cleaner, and less expensive, electricity is available. Successful deployment of load shifting can be a win-win for participating customers and all customers. However, as the opposition to this bill contends there are potential risks that must also be mitigated, especially in relation to dynamic rates and ensuring the resources are cost-effective. Moreover, to the extent load-shifting resources are required as part of LSEs’ procurement, ensuring these resources compete with others can help support the least-cost, best-fit principles. The CEC, in its report, acknowledged the load-shift goal is “aspirational, but achievable with robust policy support” and merits further evaluation for cost-effectiveness. The CEC also expressed reluctance to recommend subgoals for specific program types, sectors, or jurisdictions. This bill does not require procurement, but would require the CEC to report on the procurement to meet the load-shifting goal by each retail supplier (except those who are also authorized to be excluded from the requirement of the CEC’s Power Content Label requirements).
Prior/Related Legislation
AB 1117 (Schultz) of the current legislative session, requires the CPUC, by July 1, 2028, to develop optional, dynamic electricity rates for large electrical investor-owned utility customers. The bill is pending in the Assembly.
SB 846 (Dodd, Chapter 239, Statutes of 2022) among its many provisions, required the CEC, in consultation with the CPUC, and CAISO, to adopt a goal for load-shifting to reduce net peak electrical demand and to adjust this target in each biennial IEPR.
AB 327 (Perea, Chapter 611, Statutes of 2013) among its many provisions, restructured the rate design for residential electric customers.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Senate Appropriations Committee, ongoing costs likely in the hundreds of thousands of dollars annually for the CEC (Energy Resources Program Account [ERPA] or other fund source) and the CPUC (ratepayer funds) to the implement the provisions of this bill.
SUPPORT: (Verified 5/23/25)
California Efficiency + Demand Management Council
California Solar & Storage Association
Carbon Free Palo Alto
Carbon Free Silicon Valley
Natural Resources Defense Council
OPPOSITION: (Verified 5/23/25)
California Community Choice Association
Marin Clean Energy
Pacific Gas and Electric Company
Public Advocates Office
San Diego Gas & Electric
Southern California Edison
ARGUMENTS IN SUPPORT: The Natural Resources Defense Council states:
…[SB 541] would reinforce and smooth the implementation of the state’s load flexibility goal, while requiring cost-effectiveness and strategic integration. Increasing cost-effective load flexibility on the grid can be beneficial because it allows for more effective use of electrified buildings and vehicles, reduces the electricity infrastructure costs needed to support economic development, and increases the reliability and resiliency of the grid. …SB 541 applies a reasonable next step toward cost-effectively and strategically increasing and investing in load-shifting resources to support a more resilient, zero-emission electricity grid.
ARGUMENTS IN OPPOSITION: Several of the entities opposed to this bill, including utilities and CCAs, generally express concerns that this bill will create a de-facto procurement requirement, conflicts with existing efforts at the CEC and CPUC to pilot and deploy real-time pricing and hourly pricing changes, and could increase costs to customers. California Community Choice Association and Marin Clean Energy also argue the CPUC does not have the authority to require CCAs to offer dynamic rates.
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
5/27/25 13:49:48
**** END ****
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
SB 541 (Becker) - Electricity: load shifting
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would require the California Energy Commission (CEC), as part of the integrated energy policy report (IEPR), to allocate the load shifting needed to reach the goal of 7,000 MW by 2030 (adjusted biennially) to each retail supplier based on the CEC's estimate of its load-shifting potential. It would also require the California Public Utilities Commission (CPUC) to consider whether larger differentials between peak and off-peak time-of-use periods would be a cost-effective way to address peak load and whether distinguishing between nighttime off-peak and daytime off-peak periods would be a cost-effective way to align flexible load with period of abundant clean energy.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on May 23, 2025
Fiscal Impact:
- Ongoing costs likely in the hundreds of thousands of dollars annually for the CEC (Energy Resources Program Account [ERPA] or other fund source) and the CPUC (ratepayer funds) to the implement the provisions of this bill.
Committee Amendments:
Committee amendments would strike the requirement for the CPUC to consider peak and off-peak differentials.
-- END --
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
SB 541 (Becker) - Electricity: load shifting
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would require the California Energy Commission (CEC), as part of the integrated energy policy report (IEPR), to allocate the load shifting needed to reach the goal of 7,000 MW by 2030 (adjusted biennially) to each retail supplier based on the CEC's estimate of its load-shifting potential. It would also require the California Public Utilities Commission (CPUC) to consider whether larger differentials between peak and off-peak time-of-use periods would be a cost-effective way to address peak load and whether distinguishing between nighttime off-peak and daytime off-peak periods would be a cost-effective way to align flexible load with period of abundant clean energy.
Fiscal Impact:
- The CEC estimates ongoing costs of $452,000 annually (Energy Resources Program Account [ERPA] or other fund source) for 2 positions to develop and maintain the CEC’s rules and guidelines for retail suppliers to report their load flexibility contributions and develop a distribution model to conduct ongoing cost-benefit analysis/avoided cost metrics.
- The CPUC estimates ongoing costs of about $480,000 annually (ratepayer funds) for 2 positions related to the implement the provisions of this bill.
Background:
The electric grid is undergoing tremendous shifts, including transitioning to cleaner (often intermittent) resources (e.g. solar and wind) at a tremendous pace and scale, changing weather conditions/patterns (including more extreme temperature and storms), and switching or substituting energy uses (e.g. transportation and heating from fossil fuels to electricity). After the unexpected rotating outages called by the CAISO in late summer 2020 during west-wide extreme heat event, the governor and legislature took several actions to address supply shortages during and in the aftermath of these events. These actions include near term procurement orders and increasing planning reserve margins, billions of dollars from the state general fund to establish the Electricity Strategic Supply Reliability Reserve, and authorizing the extended operations of the state’s sole remaining nuclear power plant. Within the authorizing legislation for the extension of Diablo Canyon nuclear power plant, SB 846 (Dodd, Chapter 239, Statutes of 2022) also required the CEC, in consultation with the CPUC, and CAISO, to adopt a goal for load-shifting to reduce net peak electrical demand and to adjust this target in each biennial IEPR.
About load shifting. Load shifting reflects the understanding that when electricity is used can be just as important as how much is used. Load shifting entails beneficially shifting electric load (or demand) away from times when electricity is scarce, expensive, and highly polluting to times when electricity is inexpensive, clean, and plentiful. Load shifting can play an important role in helping to address the challenges on the electric grid by aligning customer demand with the supply of clean energy. Load shifting has the potential to help integrate renewable generation, reduce the strain on the electric grid, and help maintain reliability during extreme events. As electrified load increases, especially from electric vehicles, heat pumps, as well as, further adoption of distributed energy resources (especially from solar and energy storage), the need for investments in grid infrastructure may also rise and the opportunities for load shifting also increase.
CEC SB 846 Load-Shift Goal Report. In May 2023, the CEC issued the report required in SB 846 on establishing a load-shifting goal and informed by the 2020 Lawrence Berkeley National Laboratory report on the Shift Resource through 2030, and other relevant research, as required by the statute. The CEC developed a statewide load-shift goal for 2030 of 7,000 megawatts (MW), including 3,400-3,900 MW of incremental resources.
CEC and CPUC efforts to employ time-varying rates. In addition to the SB 846 report, both the CEC and CPUC are pursuing load flexibility from time-varying rates. The CEC’s Load Management Standard proceeding has directed LSEs to create at least one hourly rate offering, or an equivalent program, by 2027. The MIDAS provides a centralized rate database that customers, developers, and devices can use to access rate information. The Flexible Demand Appliance Standards (FDAS) will provide direction to device manufacturers to enable beneficial load flexibility in response to these rates. In June 2022, the CPUC staff issued a report with a proposed roadmap for hourly dynamic pricing to enable widespread load flexibility, including load shifting, called the California Flexible Unified Signal for Energy (CalFUSE). Subsequently, the CPUC opened a rulemaking, Order Instituting Rulemaking to Advance Demand Flexibility Through Electric Rates (R. 22-07-005), to enable widespread demand flexibility, instead of the historical piecemeal approach. As part of the proceeding the CPUC has directed electric investor-owned utilities (IOUs) to deploy pilot programs to gain learnings and understandings about the effects of dynamic rates.
Proposed Law:
This bill would require CEC, as part of the IEPR, to allocate the load shifting needed to reach the goal of 7,000 MW by 2030 (adjusted biennially) to each retail supplier based on the CEC's estimate of its load-shifting potential. It would also require the CPUC to consider whether larger differentials between peak and off-peak time-of-use periods would be a cost-effective way to address peak load and whether distinguishing between nighttime off-peak and daytime off-peak periods would be a cost-effective way to align flexible load with period of abundant clean energy.
This bill would:
- Require, as part of each IEPR, the CEC to allocate the load shifting needed to reach the established load-shifting goal to each retail supplier based on the commission's estimate of its load-shifting potential and other relevant factors. Provide that the CEC shall exclude the load shifting expected to be met by emergency programs, as specified.
- Require the CEC, by July 1, 2028, to evaluate and publish on its website the amount of load shifting that each retail supplier achieved in the prior calendar year and the amount it is expected to achieve in future years based on specified conditions.
- Require the CEC, in making the evaluation, to do the following:
- Establish standards for evaluating the effectiveness of the various load shifting strategies for the purpose of estimating the amount of load shifting; and
- Allocate to each retail supplier its share of credit for nonemergency load shifting that is procured or obtained through a centralized procurement mechanism, broadly applicable rate design program, or other collective activity, as specified.
- Require the CEC, in consultation with the CPUC and the Independent System Operator (CAISO), to do the following:
- Identify and evaluate barriers to effectively implementing load-shifting strategies and recommend to the Legislature methods to eliminate or reduce those barriers in each biennial IEPR.
- Establish a location-based avoided cost metric that estimates the value of demand reduction at different times and locations and require electrical corporations to continuously update these location-based avoided cost metrics and make them available to third parties to encourage investment in load flexibility in locations and for time periods where it would provide the largest electrical grid benefits.
- Define "load shifting" as a reduction in demand that benefits the electrical grid, including by reducing the need for peak generation capacity and investments in transmission or distribution infrastructure. Provide it may include load-modifying resources and supply-side load flexibility resources. Also provide it may include the use of backup generators, or any other greenhouse gas emitting resources, only within emergency programs.
- Require the CPUC, as part of a new or existing proceeding, to consider both of the following:
- Whether larger differentials between peak and off-peak time-of-use periods, including larger differentials for the transmission and distribution portions of rates, would be a cost-effective way to address peak load.
- Whether distinguishing between nighttime off-peak and daytime off-peak periods would be a cost-effective way to align flexible load with periods of abundant renewable and zero-carbon energy.
Related Legislation:
AB 1117 (Schultz) of the current legislative session, requires the CPUC, by July 1, 2028, to develop optional, dynamic electricity rates for large electrical investor-owned utility customers.
SB 846 (Dodd, Chapter 239, Statutes of 2022) among its many provisions, required the CEC, in consultation with the CPUC, and CAISO, to adopt a goal for load-shifting to reduce net peak electrical demand and to adjust this target in each biennial IEPR.
AB 327 (Perea, Chapter 611, Statutes of 2013), among its many provisions, restructured the rate design for residential electric customers.
Staff Comments:
The main funding source supporting CEC is ERPA, which was established to provide funds for ongoing energy programs and energy as established to provide funds for ongoing energy programs and energy projects, including the operations of the CEC. ERPA is supported by a statutory surcharge on electricity consumption. According to the CEC, as building and appliance energy efficiency and the increase of behind-the-meter solar produce customer savings and flatten statewide electricity consumption, ERPA revenues have decreased, and the costs have been borne by fewer and fewer customers. Even as revenues drop, ERPA is repeatedly tapped to support new programs and must cover increases in employee compensation and benefit contributions.
As part of the 2022-23 budget, the Legislature passed trailer bill language that raised the statutory cap on the ERPA surcharge, tied the statutory cap to the Consumer Price Index, and extended the surcharge to behind-the-meter electricity consumption. Using ERPA to fund implementation of this bill would increase ERPA expenditures thereby exacerbating the structural deficit. A better funding source may need to be identified.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Josh Becker, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 4/21/2025
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill requires a number of actions towards achieving a goal for electric load shifting, the concept of shifting or shedding electric load or demand away from times when electricity is expensive, polluting, and scarce.
ANALYSIS:
Existing law:
- Existing law vests the California Public Utilities Commission (CPUC) with regulatory jurisdiction over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) to adopt a biennial integrated energy policy report (IEPR) containing certain information in a specified format. (Public Resources Code §25302)
- Requires the CEC, in consultation with the CPUC, and the California Independent System Operator (CAISO), to adopt a goal for load shifting to reduce net peak electrical demand and adjust this target in each biennial IEPR thereafter. (Public Resources Code §25302.7)
- Requires the CPUC to adopt a process for each load-serving entity (LSE) to file an integrated resource plan and a schedule for periodic updates to the plan and to ensure that LSEs, among other things, enhance distribution systems and demand-side energy management. (Public Utilities Code §454.52)
- Requires that all rates for any service or product charged by an electrical corporation must be just and reasonable. (Public Utilities Code §451)
- Authorizes the CPUC to authorize electrical corporations to offer residential customers the option of receiving service on time-variant pricing (time-of-use rates, critical peak-pricing, and real-time pricing). Prohibits the CPUC from establishing a mandatory default time-variant pricing tariff for residential customers, except for default time-of-use rates. Requires the CPUC to ensure that any time-of-use rate schedule does not cause unreasonable hardship for senior citizens or economically vulnerable customers in hot climate zones. (Public Utilities Code §745)
This bill:
- Requires the CEC, as part of each IEPR, to allocate the incremental load shifting needed to reach the load-shifting goal required by Public Resources Code §25302.7, including biennial adjustments to the goal, to each retail supplier based on the relative share of statewide load of each retail supplier.
- Requires the CEC to establish rules for evaluating the effectiveness of the various load-shifting strategies for the purpose of determining how much credit a retail supplier should get for each type of load flexibility effort it undertakes.
- Requires that LSEs meet the incremental load-shifting goal, to the extent that the goal is cost effective.
- Requires all retail suppliers to provide rate information to the CEC’s Market-Informed Demand Automation Server (MIDAS) in order to provide third-party devices with access to real-time rate information for the purpose of efficiently automating load flexibility.
- Requires the CPUC, on or before January 1, 2028, to require all LSEs to offer optional dynamic pricing tariffs and the governing boards of each local publicly owned electric utility to consider offering dynamic pricing tariffs.
- Requires the CPUC, as part of a new or existing proceeding, to consider (1) whether larger differentials between peak and off-peak time-of-use periods, including larger differentials for the transmission and distribution portion of rates, would be a cost-effective way to address peak load, and (2) whether distinguishing between nighttime off-peak and daytime off-peak periods would be a cost-effective way to align flexible load with periods of abundant renewable and zero-carbon energy.
Background
A changing electric grid. The electric grid is undergoing tremendous shifts, including transitioning to cleaner (often intermittent) resources (e.g. solar and wind) at a tremendous pace and scale, changing weather conditions/patterns (including more extreme temperature and storms), and switching or substituting energy uses (e.g. transportation and heating from fossil fuels to electricity). After the unexpected rotating outages called by the CAISO in late summer 2020 during west-wide extreme heat event, the governor and legislature took several actions to address supply shortages during and in the aftermath of these events. These actions include near term procurement orders and increasing planning reserve margins, billions of dollars from the state general fund to establish the Electricity Strategic Supply Reliability Reserve, and authorizing the extended operations of the state’s sole remaining nuclear power plant. Within the authorizing legislation for the extension of Diablo Canyon nuclear power plant, SB 846 (Dodd, Chapter 239, Statutes of 2022) also required the CEC, in consultation with the CPUC, and CAISO, to adopt a goal for load-shifting to reduce net peak electrical demand and to adjust this target in each biennial IEPR.
About load shifting. Load shifting reflects the understanding that when electricity is used can be just as important as how much is used. Load shifting entails beneficially shifting electric load (or demand) away from times when electricity is scarce, expensive, and highly polluting to times when electricity is inexpensive, clean, and plentiful. Load shifting can play an important role in helping to address the challenges on the electric grid by aligning customer demand with the supply of clean energy. Load shifting has the potential to help integrate renewable generation, reduce the strain on the electric grid, and help maintain reliability during extreme events. As electrified load increases, especially from electric vehicles, heat pumps, as well as, further adoption of distributed energy resources (especially from solar and energy storage), the need for investments in grid infrastructure may also rise and the opportunities for load shifting also increase.
CEC SB 846 Load-Shift Goal Report. In May 2023, the CEC issued the report required in SB 846 on establishing a load-shifting goal and informed by the 2020 Lawrence Berkeley National Laboratory report on the Shift Resource through 2030, and other relevant research, as required by the statute. The CEC developed a statewide load-shift goal for 2030 of 7,000 megawatts (MW), including 3,400-3,900 MW of incremental resources. The goal encompasses three categories of load flexibility resources:
- Load-modifying demand flexibility resources (3,000 MW) directly impact the load forecast and resource procurement requirements of LSEs. The most common category is time-varying rates, such as time-of-use or hourly dynamic rates that reflect actual grid conditions.
- Resource planning and procurement load flexibility resources (1,620-1,775 MW) either contributes to meeting Resource Adequacy (RA) requirements or reduces RA requirements as a credit. This category includes supply-side demand response that participates in the CAISO as economic or reliability demand response.
- Incremental and emergency load-flexibility resource programs (1,175 MW) intended to increase resource availability during extreme events and do not contribute to meeting RA requirements. These include the Emergency Load Reduction Program and the Demand Side Grid Support program which can be activated during emergency grid events.
The CEC report cautions the statewide goal is based on economic potential.
Further analysis is needed to determine the cost-effectiveness of specific load flexibility resources and programs. …The proposed goal is not intended to suggest that the state should pursue these targets without the evaluation of the cost-effectiveness of specific resources or programs that would contribute to the goal.
The report also includes 18 policy recommendations to support deployment of the three category of resources.
CEC and CPUC efforts to employ time-varying rates. In addition to the SB 846 report, both the CEC and CPUC are pursuing load flexibility from time-varying rates. The CEC’s Load Management Standard proceeding has directed LSEs to create at least one hourly rate offering, or an equivalent program, by 2027. The MIDAS provides a centralized rate database that customers, developers, and devices can use to access rate information. The Flexible Demand Appliance Standards (FDAS) will provide direction to device manufacturers to enable beneficial load flexibility in response to these rates. In June 2022, the CPUC staff issued a report with a proposed roadmap for hourly dynamic pricing to enable widespread load flexibility, including load shifting, called the California Flexible Unified Signal for Energy (CalFUSE). Subsequently, the CPUC opened a rulemaking, Order Instituting Rulemaking to Advance Demand Flexibility Through Electric Rates (R. 22-07-005), to enable widespread demand flexibility, instead of the historical piecemeal approach. As part of the proceeding the CPUC has directed electric investor-owned utilities (IOUs) to deploy pilot programs to gain learnings and understandings about the effects of dynamic rates.
Comments
Need for this bill. The author states:
Electrical bills have grown unsustainably, and the state is looking for ways to constrain future cost increases. Electricity system costs (at least for transmission and distribution) are mostly driven by the need to provide reliable power during the periods of highest demand. If utilities can lower their system peak energy demand – by getting customers to adjust thermostats or shift some of their demand to other times of day, for example – then the utilities can serve more demand during off-peak hours (which helps to lower rates) while avoiding new investments to add to peak capacity. The CEC’s “Load-Shift Goal Report” set a goal of achieving 7000 MW of cost-effective load shifting by 2030 (with 3400-3900 MW of that not yet being captured). While the CEC’s goal has shed light on this large cost-saving opportunity, more is needed to push our electricity suppliers to capture those savings and make load-flexibility a routine part of their system planning and energy procurement efforts.
Impacts to ratepayers. As the supporters of this bill note, the increasing costs of utility bills, along with anticipated expansion of new resources and the electric grid, necessitate ensuring that electric grid investments are judicious and prudent. Load shifting provides an important potential to better optimize electric grid resources while shifting load during times when cleaner, and less expensive, electricity is available. Successful deployment of load shifting can be a win-win for participating customers and all customers. However, as the opposition to this bill contends there are potential risks that must also be mitigated, especially in relation to dynamic rates and ensuring the resources are cost-effective. Moreover, to the extent load-shifting resources are required as part of LSEs’ procurement, ensuring these resources compete with others can help support the least-cost, best-fit principles. The CEC, in its report, acknowledged the load-shift goal is “aspirational, but achievable with robust policy support” and merits further evaluation for cost-effectiveness. The CEC also expressed reluctance to recommend subgoals for specific program types, sectors, or jurisdictions.
Need for amendments. The author has acknowledged the desire to amend this bill to address many of the oppositions’ concerns. In this regard, the author and committee may wish to:
- Delete language that is viewed as de-facto procurement by including load-shifting incremental allocations and requirements within the statutes regarding integrated resource planning (Section 2 of this bill).
- Delete language requiring the CPUC to require electrical corporations and governing boards of local publicly owned utilities (POUs) to offer optional dynamic pricing tariffs by January 1, 2028 (Section 3 of the bill would be deleted except for (d)).
- Recast the requirements on the CEC to estimate the load-shifting potential:
- Delete references to “incremental.”
- Require the CEC to provide estimates for each retail supplier’s potential allocation.
- Require the CEC to evaluate and report the amount of load shift that each retail supplier is expected to achieve based on their filed IRP and their comparison to the goal.
- Establish rules on the effectiveness of load-shifting strategies.
- Allocate nonemergency load-shifting procured from any centralized procurement mechanism.
- Require the CEC to establish a location-based avoided cost metric that estimates the value of demand reduction at different times and locations.
- Clarify that “load shifting” means reduction in demand (not solely net peak demand) that benefits the electric grid (remove reference to prescriptive “top 100 net system load hours”).
Prior/Related Legislation
AB 1117 (Schultz) of the current legislative session, requires the CPUC, by July 1, 2028, to develop optional, dynamic electricity rates for large electrical investor-owned utility customers. The bill is pending in the Assembly Appropriations Committee.
SB 846 (Dodd, Chapter 239, Statutes of 2022) among its many provisions, required the CEC, in consultation with the CPUC, and CAISO, to adopt a goal for load-shifting to reduce net peak electrical demand and to adjust this target in each biennial IEPR.
AB 327 (Perea, Chapter 611, Statutes of 2013), among its many provisions, restructured the rate design for residential electric customers.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
California Efficiency + Demand Management Council
California Solar & Storage Association
Natural Resources Defense Council
OPPOSITION:
California Community Choice Association
Marin Clean Energy
Pacific Gas and Electric Company
Public Advocates Office
San Diego Gas & Electric Company
Southern California Edison
ARGUMENTS IN SUPPORT: The Natural Resources Defense Council states:
…[SB 541] would reinforce and smooth the implementation of the state’s load flexibility goal, while requiring cost-effectiveness and strategic integration. Increasing cost-effective load flexibility on the grid can be beneficial because it allows for more effective use of electrified buildings and vehicles, reduces the electricity infrastructure costs needed to support economic development, and increases the reliability and resiliency of the grid. …SB 541 applies a reasonable next step toward cost-effectively and strategically increasing and investing in load-shifting resources to support a more resilient, zero-emission electricity grid.
ARGUMENTS IN OPPOSITION: The Public Advocates Office expresses concerns that “creating new legislative requirements for dynamic rates, when significant regulatory efforts are already underway, will be problematic and could significantly increase customer rates.” They recommend “dynamic rates be carefully considered through the existing regulatory framework to allow for stakeholder involvement and the necessary procedural oversights.”
The other entities, including utilities and community choice aggregators (CCAs), opposed to the bill generally express concerns that the bill will create a de-facto procurement requirement, conflicts with existing efforts at the CEC and CPUC to pilot and deploy real-time pricing and hourly pricing changes, and could increase costs to customers. CalCCA and MCE also argue the CPUC does not have the authority to require CCAs to offer dynamic rates.
-- END --