SB 607: Golden Gate Bridge, Highway and Transportation District: contributions and loans.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2026-09-30
Current Status:
Passed
(2026-09-30: Chaptered by Secretary of State. Chapter 972, Statutes of 2026.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law prohibits the Golden Gate Bridge, Highway and Transportation District from issuing general obligation or revenue bonds, or any other form of long-term indebtedness, except to finance an interim system of buses and ferries or to finance capital improvements or modifications relating to seismic safety of the Golden Gate Bridge.
This bill would authorize the district to accept contributions and loans from this state and the United States for the purpose of financing capital improvements or modifications related to seismic safety on the Golden Gate Bridge, as specified.
Existing law prohibits the Golden Gate Bridge, Highway and Transportation District from issuing general obligation or revenue bonds, or any other form of long-term indebtedness, except to finance an interim system of buses and ferries or to finance capital improvements or modifications relating to seismic safety of the Golden Gate Bridge.
This bill would authorize the district to accept contributions and loans from this state and the United States for the purpose of financing capital improvements or modifications related to seismic safety on the Golden Gate Bridge, as specified.
Existing law prohibits the Golden Gate Bridge, Highway and Transportation District from issuing general obligation or revenue bonds, or any other form of long-term indebtedness, except to finance an interim system of buses and ferries or to finance capital improvements or modifications relating to seismic safety of the Golden Gate Bridge.
This bill would authorize the district to accept contributions and loans from this state and the United States for the purpose of financing capital improvements or modifications related to seismic safety on the Golden Gate Bridge, as specified.
Existing law prohibits the Golden Gate Bridge, Highway and Transportation District from issuing general obligation or revenue bonds, or any other form of long-term indebtedness, except to finance an interim system of buses and ferries or to finance capital improvements or modifications relating to seismic safety of the Golden Gate Bridge.
This bill would authorize the district to accept contributions and loans from this state and the United States for the purpose of financing capital improvements or modifications related to seismic safety on the Golden Gate Bridge, as specified.
Existing law authorizes the Regents of the University of California to establish 4 California Institutes for Science and Innovation at separate campuses of the University of California for specified purposes. Existing law authorizes the concentration of each institute to include, among other concentrations, medicine, bioengineering, or space.This bill would explicitly authorize the concentration of an institute to include artificial intelligence.Existing law authorizes the Regents of the University of California to establish 4 California Institutes for Science and Innovation at separate campuses of the University of California for specified purposes. Existing law authorizes the concentration of each institute to include, among other concentrations, medicine, bioengineering, or space.
This bill would explicitly authorize the concentration of an institute to include artificial intelligence.
Existing law establishes various grant and loan programs for research, including, among others, the California Institute for Regenerative Medicine, California Firefighter Cancer Prevention and Research Program, and the Public Interest Research, Development, and Demonstration Program.This bill would establish the California Foundation for Science and Health Research within the Government Operations Agency. The bill would create the California Foundation for Science and Health Research Fund, upon appropriation by the Legislature, and require the moneys in the fund to be used by the foundation to award grants and make loans to public or private research companies, universities, institutes, and organizations for scientific research and development, in specific areas of research, including, but not limited to, biomedical, behavioral, and climate research.This bill would create the California Foundation for Science and Health Research Council, as specified. The bill would require the council to, among other things, develop the strategic objectives and priorities of the foundation and determine the research projects that will be funded by the California Foundation for Science and Health Research Fund, as specified. The bill would require a majority vote by the appointed members for the council for the approval of funding for any research project or proposal presented for funding. The bill would authorize the council to establish one or more scientific peer review panels consisting of experts in specified fields of research for the purposes of reviewing and prioritizing proposals on the basis of the track record of the investigators, scientific merit of the proposal, and potential benefit to the health and well-being of the population, natural resources, and environment of the state.This bill would require all research and development funded by the California Foundation for Science and Health Research Fund to be conducted under established standards of open scientific exchange, peer review, and public oversight. The bill would require the funds to be awarded on the basis of the research priorities established for the foundation by the council and the scientific merit of the proposed research, as determined by an open, competitive, scientific peer review process that ensures objectivity, consistency, and high quality.This bill would enact the California Science and Health Research Bond Act, which, if approved by the voters, would authorize the issuance of bonds in the amount of $23,000,000,000, pursuant to the State General Obligation Bond Law, to finance grants and loans to fund research and construct, operate, and maintain facilities for research.The bill would provide for the submission of the bond act to the voters at the next statewide general election.Existing constitutional provisions require that a statute that limits the right of access to the meetings of public bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest protected by the limitation and the need for protecting that interest.This bill would make legislative findings to that effect.Existing law establishes various grant and loan programs for research, including, among others, the California Institute for Regenerative Medicine, California Firefighter Cancer Prevention and Research Program, and the Public Interest Research, Development, and Demonstration Program.
This bill would establish the California Foundation for Science and Health Research within the Government Operations Agency. The bill would create the California Foundation for Science and Health Research Fund, upon appropriation by the Legislature, and require the moneys in the fund to be used by the foundation to award grants and make loans to public or private research companies, universities, institutes, and organizations for scientific research and development, in specific areas of research, including, but not limited to, biomedical, behavioral, and climate research.
This bill would create the California Foundation for Science and Health Research Council, as specified. The bill would require the council to, among other things, develop the strategic objectives and priorities of the foundation and determine the research projects that will be funded by the California Foundation for Science and Health Research Fund, as specified. The bill would require a majority vote by the appointed members for the council for the approval of funding for any research project or proposal presented for funding. The bill would authorize the council to establish one or more scientific peer review panels consisting of experts in specified fields of research for the purposes of reviewing and prioritizing proposals on the basis of the track record of the investigators, scientific merit of the proposal, and potential benefit to the health and well-being of the population, natural resources, and environment of the state.
This bill would require all research and development funded by the California Foundation for Science and Health Research Fund to be conducted under established standards of open scientific exchange, peer review, and public oversight. The bill would require the funds to be awarded on the basis of the research priorities established for the foundation by the council and the scientific merit of the proposed research, as determined by an open, competitive, scientific peer review process that ensures objectivity, consistency, and high quality.
This bill would enact the California Science and Health Research Bond Act, which, if approved by the voters, would authorize the issuance of bonds in the amount of $23,000,000,000, pursuant to the State General Obligation Bond Law, to finance grants and loans to fund research and construct, operate, and maintain facilities for research.
The bill would provide for the submission of the bond act to the voters at the next statewide general election.
Existing constitutional provisions require that a statute that limits the right of access to the meetings of public bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest protected by the limitation and the need for protecting that interest.
This bill would make legislative findings to that effect.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.Existing law, the Sacramento-San Joaquin Delta Reform Act of 2009, declares that the Sacramento-San Joaquin Delta is a critically important natural resource for California and the nation and it serves as both the hub of the California water system and the most valuable estuary and wetland ecosystem on the west coast of North and South America.This bill would state the intent of the Legislature that, among other things, no revisions shall be made to CEQA for purposes of the Delta Conveyance Project.The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. Existing law defines negative declaration and mitigated negative declaration for these purposes.
This bill would revise the definition of negative declaration to mean a written statement briefly describing the reasons the lead agency has determined, based upon substantial evidence in the record, that the proposed project will not have a significant effect on the environment, as specified. The bill would require a negative declaration to be prepared for a proposed project if the lead agency determines, based upon substantial evidence, in light of the whole record before the agency, that the project will not have a significant effect on the environment or when an initial study identifies potentially significant effects on the environment but revisions in the project plans would avoid the effects or mitigate the effects, as provided, and the lead agency has determined, based upon substantial evidence, in light of the whole record before the lead agency, that the project, as revised, will not have a significant effect on the environment. The bill would also revise the definition of mitigated negative declaration to mean that revisions would avoid or mitigate the effects on the environment, as determined by the lead agency based upon substantial evidence in the record, as specified, and that the lead agency has determined, based upon substantial evidence in the record, that the project, as revised, will not have a significant effect on the environment, as provided. The bill would require an EIR to be prepared if the lead agency determines, based upon substantial evidence, in light of the whole record before the agency, that it is more likely than not that the project will have a significant effect on the environment.Existing law requires the lead agency to determine whether a project may have a significant effect on the environment based on substantial evidence in light of the whole record, as provided.This bill would instead require a lead agency to determine whether a project is more likely than not to have a significant effect on the environment based on substantial evidence in light of the whole record, and would require an EIR to be prepared if the lead agency determines that it is more likely than not that a project will have a significant effect on the environment, as specified.CEQA requires the Office of Land Use and Climate Innovation to prepare and develop proposed guidelines for the implementation of CEQA by public agencies and requires the Secretary of the Natural Resources Agency to certify and adopt those proposed guidelines. CEQA requires those adopted guidelines to include a list of classes of projects that have been determined not to have a significant effect on the environment and exempts those classes of projects from CEQA, commonly known as categorical exemptions. CEQA requires the guidelines to include criteria for public agencies to follow in determining whether or not a proposed project may have a significant effect on the environment, and requires the criteria to require a finding that a project may have a significant effect on the environment if one or more of specified conditions exist.This bill would instead require those criteria to require that finding if the lead agency determines, based upon substantial evidence in the record, that one or more of those specified conditions exist. The bill would, for the approval of a proposed project that would otherwise be exempt from CEQA pursuant to a statutory or categorical exemption adopted before January 1, 2026, but for a single condition, as defined, limit the application of CEQA to the effects upon the environment that are caused solely by that single condition. For these projects, the bill would only require the initial study or EIR to examine those effects that the lead agency determines, based upon substantial evidence in the record, are caused solely by the single condition that makes the proposed project ineligible for the exemption, as provided. The bill would provide that these provisions do not apply to, among other things, a project that includes a distribution center, as defined, oil and gas infrastructure, as defined, or a project located on natural and protected lands, as defined. The bill would exempt from the requirements of CEQA, except as provided, a rezoning that implements the schedule of actions contained in an approved housing element, as specified. Because the bill would require a lead agency to determine the applicability of this exemption, the bill would impose a state-mandated local program.This bill would require the office, on or before July 1, 2026, to map the eligible urban infill sites within every urbanized area or urban cluster in the state, as provided. The bill would require the office, on or before July 1, 2026, to prepare, develop, and transmit to the agency for certification and adoption an amendment to the infill development project categorical exemption that establishes an alternative means of compliance with the requirements of that categorical exemption, as provided. The bill would provide that specified regulations related to the significant effect exception to the use of a categorical exemption do not apply to an infill project that meets all conditions of the infill development project categorical exemption. The bill, for a proposed project that meets specified elements of the infill development project categorical exemption that is otherwise ineligible for the categorical exemption due to one or more conditions, as defined, would limit the application of CEQA to the effects upon the environment that are caused solely by those conditions that make the project ineligible for the categorical exemption. The bill would provide that these provisions do not apply to a project that includes a distribution center or oil and gas infrastructure.CEQA requires an action or proceeding to attack, review, set aside, void, or annul certain acts or decisions of a public agency to be commenced according to specified processes, including that at the time that the action or proceeding is filed, the plaintiff or petitioner is required to file a request that the respondent public agency prepare the record of proceedings relating to the subject of the action or proceeding, and requires the record of proceedings to include specified items and materials, including, among other things, all internal agency communications, including staff notes and memoranda related to the project or to compliance with CEQA, but excluding communications that are of a logistical nature, as specified.This bill would, except for a project that includes a distribution center or oil and gas infrastructure, exclude staff notes and electronic internal agency communications, including emails, that were not presented to the final decisionmaking body, from the record of proceedings, as provided.CEQA requires a court to enter an order that includes a mandate necessary to achieve compliance with CEQA, as specified, when a court finds, as a result of a trial, hearing, or remand from an appellate court, that any determination, finding, or decision of a public agency has been made without compliance with CEQA.This bill would require that order to be subject to specified limitations for a determination of a public agency that a project is eligible for a statutory exemption or categorical exemption that is found to violate CEQA.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Existing law, the Sacramento-San Joaquin Delta Reform Act of 2009, declares that the Sacramento-San Joaquin Delta is a critically important natural resource for California and the nation and it serves as both the hub of the California water system and the most valuable estuary and wetland ecosystem on the west coast of North and South America.
This bill would state the intent of the Legislature that, among other things, no revisions shall be made to CEQA for purposes of the Delta Conveyance Project.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. Existing law defines negative declaration and mitigated negative declaration for these purposes.
This bill would revise the definition of negative declaration to mean a written statement briefly describing the reasons the lead agency has determined, based upon substantial evidence in the record, that the proposed project will not have a significant effect on the environment, as specified. The bill would require a negative declaration to be prepared for a proposed project if the lead agency determines, based upon substantial evidence, in light of the whole record before the agency, that the project will not have a significant effect on the environment or when an initial study identifies potentially significant effects on the environment but revisions in the project plans would avoid the effects or mitigate the effects, as provided, and the lead agency has determined, based upon substantial evidence, in light of the whole record before the lead agency, that the project, as revised, will not have a significant effect on the environment. The bill would also revise the definition of mitigated negative declaration to mean that revisions would avoid or mitigate the effects on the environment, as determined by the lead agency based upon substantial evidence in the record, as specified, and that the lead agency has determined, based upon substantial evidence in the record, that the project, as revised, will not have a significant effect on the environment, as provided. The bill would require an EIR to be prepared if the lead agency determines, based upon substantial evidence, in light of the whole record before the agency, that it is more likely than not that the project will have a significant effect on the environment.
Existing law requires the lead agency to determine whether a project may have a significant effect on the environment based on substantial evidence in light of the whole record, as provided.
This bill would instead require a lead agency to determine whether a project is more likely than not to have a significant effect on the environment based on substantial evidence in light of the whole record, and would require an EIR to be prepared if the lead agency determines that it is more likely than not that a project will have a significant effect on the environment, as specified.
CEQA requires the Office of Land Use and Climate Innovation to prepare and develop proposed guidelines for the implementation of CEQA by public agencies and requires the Secretary of the Natural Resources Agency to certify and adopt those proposed guidelines. CEQA requires those adopted guidelines to include a list of classes of projects that have been determined not to have a significant effect on the environment and exempts those classes of projects from CEQA, commonly known as categorical exemptions. CEQA requires the guidelines to include criteria for public agencies to follow in determining whether or not a proposed project may have a significant effect on the environment, and requires the criteria to require a finding that a project may have a significant effect on the environment if one or more of specified conditions exist.
This bill would instead require those criteria to require that finding if the lead agency determines, based upon substantial evidence in the record, that one or more of those specified conditions exist. The bill would, for the approval of a proposed project that would otherwise be exempt from CEQA pursuant to a statutory or categorical exemption adopted before January 1, 2026, but for a single condition, as defined, limit the application of CEQA to the effects upon the environment that are caused solely by that single condition. For these projects, the bill would only require the initial study or EIR to examine those effects that the lead agency determines, based upon substantial evidence in the record, are caused solely by the single condition that makes the proposed project ineligible for the exemption, as provided. The bill would provide that these provisions do not apply to, among other things, a project that includes a distribution center, as defined, oil and gas infrastructure, as defined, or a project located on natural and protected lands, as defined. The bill would exempt from the requirements of CEQA, except as provided, a rezoning that implements the schedule of actions contained in an approved housing element. element, as specified. Because the bill would require a lead agency to determine the applicability of this exemption, the bill would impose a state-mandated local program.
This bill would require the office, on or before July 1, 2026, to map the eligible urban infill sites within every urbanized area or urban cluster in the state, as provided. The bill would require the office, on or before July 1, 2026, to prepare, develop, and transmit to the agency for certification and adoption an amendment to the infill development project categorical exemption that establishes an alternative means of compliance with the requirements of that categorical exemption, as provided. The bill would provide that specified regulations related to the significant effect exception to the use of a categorical exemption do not apply to an infill project that meets all conditions of the infill development project categorical exemption. The bill, for a proposed project that meets specified elements of the infill development project categorical exemption that is otherwise ineligible for the categorical exemption due to one or more conditions, as defined, would limit the application of CEQA to the effects upon the environment that are caused solely by those conditions that make the project ineligible for the categorical exemption. The bill would provide that these provisions do not apply to a project that includes a distribution center or oil and gas infrastructure.
CEQA requires an action or proceeding to attack, review, set aside, void, or annul certain acts or decisions of a public agency to be commenced according to specified processes, including that at the time that the action or proceeding is filed, the plaintiff or petitioner is required to file a request that the respondent public agency prepare the record of proceedings relating to the subject of the action or proceeding, and requires the record of proceedings to include specified items and materials, including, among other things, all internal agency communications, including staff notes and memoranda related to the project or to compliance with CEQA, but excluding communications that are of a logistical nature, as specified.
This bill would, except for a project that includes a distribution center or oil and gas infrastructure, exclude staff notes and electronic internal agency communications, including emails, that were not presented to the final decisionmaking body, from the record of proceedings, as provided.
CEQA requires a court to enter an order that includes a mandate necessary to achieve compliance with CEQA, as specified, when a court finds, as a result of a trial, hearing, or remand from an appellate court, that any determination, finding, or decision of a public agency has been made without compliance with CEQA.
This bill would require that order to be subject to specified limitations for a determination of a public agency that a project is eligible for a statutory exemption or categorical exemption that is found to violate CEQA.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. Existing law defines negative declaration and mitigated negative declaration for these purposes.
This bill would revise the definition of negative declaration to mean a written statement briefly describing the reasons the lead agency has determined, based upon substantial evidence in the record record, that the proposed project will not have a significant effect on the environment, as specified. The bill would require a negative declaration to be prepared for a proposed project if the lead agency determines, based upon substantial evidence, in light of the whole record before the agency, that the project will not have a significant effect on the environment or when an initial study identifies potentially significant effects on the environment but revisions in the project plans would avoid the effects or mitigate the effects, as provided, and the lead agency has determined, based upon substantial evidence, in light of the whole record before the lead agency, that the project, as revised, will not have a significant effect on the environment. The bill would also revise the definition of mitigated negative declaration to mean that revisions would avoid or mitigate the effects on the environment, as determined by the public lead agency based upon substantial evidence in the record, as specified, and that there is the lead agency has determined, based upon substantial evidence in the record, that the project project, as revised revised, will not have a significant effect on the environment, as provided. The bill would require an EIR to be prepared if the lead agency determines, based upon substantial evidence, in light of the whole record before the agency, that it is more likely than not that the project will have a significant effect on the environment.
Existing law requires the lead agency to determine whether a project may have a significant effect on the environment based on substantial evidence in light of the whole record, as provided.
This bill would instead require a lead agency to determine whether a project is more likely than not to have a significant effect on the environment based on substantial evidence in light of the whole record, and would require an EIR to be prepared if the lead agency determines that it is more likely than not that a project will have a significant effect on the environment, as specified.
CEQA requires the Office of Land Use and Climate Innovation to prepare and develop proposed guidelines for the implementation of CEQA by public agencies and requires the Secretary of the Natural Resources Agency to certify and adopt those proposed guidelines. CEQA requires those adopted guidelines to include a list of classes of projects that have been determined not to have a significant effect on the environment and exempts those classes of projects from CEQA, commonly known as categorical exemptions. CEQA requires the guidelines to include criteria for public agencies to follow in determining whether or not a proposed project may have a significant effect on the environment, and requires the criteria to require a finding that a project may have a significant effect on the environment if one or more of specified conditions exist.
This bill would instead require those criteria to require that finding if the lead agency determines, based upon substantial evidence in the record, that one or more of those specified conditions exist. The bill would, for the approval of a proposed project that would otherwise be exempt from CEQA pursuant to a statutory or categorical exemption adopted before January 1, 2026, but for a single condition, as defined, limit the application of CEQA to the effects upon the environment that are caused solely by that single condition. For these projects, the bill would only require the initial study or EIR to examine those effects that the lead agency determines, based upon substantial evidence in the record, are caused solely by the single condition that makes the proposed project ineligible for the exemption, as provided. The bill would provide that these provisions do not apply to to, among other things, a project that includes a distribution center, as defined, or oil and gas infrastructure, as defined. defined, or a project located on natural and protected lands, as defined. The bill would exempt from the requirements of CEQA, except as provided, a rezoning that is consistent with implements an approved housing element. Because the bill would require a lead agency to determine the applicability of this exemption, the bill would impose a state-mandated local program.
This bill would require the office, on or before July 1, 2026, to map the eligible urban infill sites within every urbanized area or urban cluster in the state, as provided. The bill would require the office, on or before July 1, 2026, to prepare, develop, and transmit to the agency for certification and adoption an amendment to the infill development project categorical exemption that establishes an alternative means of compliance with the requirements of that categorical exemption, as provided. The bill would provide that specified regulations related to the significant effect exception to the use of a categorical exemption do not apply to an infill project that meets all conditions of the infill development project categorical exemption. The bill, for a proposed project that meets specified elements of the infill development project categorical exemption that is otherwise ineligible for the categorical exemption due to one or more conditions, as defined, would limit the application of CEQA to the effects upon the environment that are caused solely by those conditions that make the project ineligible for the categorical exemption. The bill would provide that these provisions do not apply to a project that includes a distribution center or oil and gas infrastructure.
CEQA requires an action or proceeding to attack, review, set aside, void, or annul certain acts or decisions of a public agency to be commenced according to specified processes, including that at the time that the action or proceeding is filed, the plaintiff or petitioner shall is required to file a request that the respondent public agency prepare the record of proceedings relating to the subject of the action or proceeding, and requires the record of proceedings to include specified items and materials, including, among other things, all internal agency communications, including staff notes and memoranda related to the project or to compliance with CEQA, but excluding communications that are of a logistical nature, as specified.
This bill would, except for a project that includes a distribution center or oil and gas infrastructure, exclude staff notes and electronic internal agency communications, including emails, that were not presented to the final decisionmaking body, from the record of proceedings, as provided.
CEQA requires a court to enter an order that includes a mandate necessary to achieve compliance with CEQA, as specified, when a court finds, as a result of a trial, hearing, or remand from an appellate court, that any determination, finding, or decision of a public agency has been made without compliance with CEQA.
This bill would require that order to be subject to specified limitations for a determination of a public agency that a project is eligible for a statutory exemption or categorical exemption that is found to violate CEQA.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. Existing law defines negative declaration and mitigated negative declaration for these purposes.
This bill would revise the definition of negative declaration to mean a written statement briefly describing the substantial evidence in the record that the proposed project will not have a significant effect on the environment, as specified. The bill would also revise the definition of mitigated negative declaration to mean that revisions would avoid or mitigate the effects on the environment, as determined by the public agency based upon substantial evidence in the record, as specified, and that there is substantial evidence that the project as revised will not have a significant effect on the environment, as provided.
CEQA requires the Office of Land Use and Climate Innovation to prepare and develop proposed guidelines for the implementation of CEQA by public agencies and requires the Secretary of the Natural Resources Agency to certify and adopt those proposed guidelines. CEQA requires those adopted guidelines to include a list of classes of projects that have been determined not to have a significant effect on the environment and exempts those classes of projects from CEQA, commonly known as categorical exemptions. CEQA requires the guidelines to include criteria for public agencies to follow in determining whether or not a proposed project may have a significant effect on the environment, and requires the criteria to require a finding that a project may have a significant effect on the environment if one or more of specified conditions exist.
This bill would require a lead agency to limit the scope of an environmental impact report to the condition of a categorical exemption that the lead agency determines, after a preliminary review of the project, disqualifies the project from eligibility under the categorical exemption, if the lead agency determines that the project meets all other conditions of the categorical exemption except for the one condition that disqualifies it, as specified. The bill would require that a lead agencys determination to adopt a negative declaration or mitigated negative declaration be upheld if there is a fair argument that substantial evidence supports the determination. would instead require those criteria to require that finding if the lead agency determines, based upon substantial evidence in the record, that one or more of those specified conditions exist. The bill would, for the approval of a proposed project that would otherwise be exempt from CEQA pursuant to a statutory or categorical exemption but for a single condition, as defined, limit the application of CEQA to the effects upon the environment that are caused solely by that single condition. For these projects, the bill would only require the initial study or EIR to examine those effects that the lead agency determines, based upon substantial evidence in the record, are caused solely by the single condition that makes the proposed project ineligible for the exemption, as provided. The bill would provide that these provisions do not apply to a project to construct or that is related to that includes a distribution center center, as defined, or oil and gas infrastructure. infrastructure, as defined. The bill would exempt from the requirements of CEQA, except as provided, a rezoning that is consistent with an approved housing element. Because the bill would require a lead agency to determine the applicability of this exemption, the bill would impose a state-mandated local program.
This bill would require the office, on or before July 1, 2026, to map the eligible urban infill sites within every incorporated city urbanized area or urban cluster in the state, as provided. The bill would require the office, on or before July 1, 2026, to prepare, develop, and transmit to the agency for certification and adoption refinements an amendment to the infill development project categorical exemption, exemption that establishes an alternative means of compliance with the requirements of that categorical exemption, as provided. The bill would provide that specified regulations related to the significant effect exception to the use of a categorical exemption do not apply to an infill project that meets all conditions of the infill development project categorical exemption. The bill would require, if an infill project is not eligible for the infill development project categorical exemption, only the reasons for the ineligibility be subject to CEQA review. bill, for a proposed project that meets specified elements of the infill development project categorical exemption that is otherwise ineligible for the categorical exemption due to one or more conditions, as defined, would limit the application of CEQA to the effects upon the environment that are caused solely by those conditions that make the project ineligible for the categorical exemption. The bill would provide that these provisions do not apply to a project to construct or that is related to that includes a distribution center or oil and gas infrastructure.
CEQA requires an action or proceeding to attack, review, set aside, void, or annul certain acts or decisions of a public agency to be commenced according to specified processes, including that at the time that the action or proceeding is filed, the plaintiff or petitioner shall file a request that the respondent public agency prepare the record of proceedings relating to the subject of the action or proceeding, and requires the record of proceedings to include specified items and materials, including, among other things, all internal agency communications, including staff notes and memoranda related to the project or to compliance with CEQA, but excluding communications that are of a logistical nature, as specified.
This bill would also exclude communications of persons tangential to or far removed from project decisionmaking from the materials to be included in the record of proceedings, except as provided. would, except for a project that includes a distribution center or oil and gas infrastructure, exclude staff notes and electronic internal agency communications, including emails, that were not presented to the final decisionmaking body, from the record of proceedings, as provided.
This bill would require, except as provided, if an action or proceeding alleging that a lead agency improperly applied to a project a statutory or categorical exemption is successful, the subsequent environmental review for the project be limited to the facts the action or proceeding relied upon that disqualified the project from the statutory or categorical exemption.CEQA requires a court to enter an order that includes a mandate necessary to achieve compliance with CEQA, as specified, when a court finds, as a result of a trial, hearing, or remand from an appellate court, that any determination, finding, or decision of a public agency has been made without compliance with CEQA.
This bill would require that order to be subject to specified limitations for a determination of a public agency that a project is eligible for a statutory exemption or categorical exemption that is found to violate CEQA.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA requires the Office of Land Use and Climate Innovation to prepare and develop proposed guidelines for the implementation of CEQA by public agencies and requires the Secretary of the Natural Resources Agency to certify and adopt those proposed guidelines. CEQA requires those adopted guidelines to include a list of classes of projects that have been determined not to have a significant effect on the environment and exempts those classes of projects from CEQA, commonly known as categorical exemptions.
This bill would require a lead agency to limit the scope of an environmental impact report to the condition of a categorical exemption that the lead agency determines, after a preliminary review of the project, disqualifies the project from eligibility under the categorical exemption, if the lead agency determines that the project meets all other conditions of the categorical exemption except for the one condition that disqualifies it, as specified. The bill would require that a lead agencys determination to adopt a negative declaration or mitigated negative declaration be upheld if there is a fair argument that substantial evidence supports the determination. The bill would provide that these provisions do not apply to a project to construct or that is related to a distribution center or oil and gas infrastructure. The bill would exempt from the requirements of CEQA, except as provided, a rezoning that is consistent with an approved housing element. Because the bill would require a lead agency to determine the applicability of this exemption, the bill would impose a state-mandated local program.
This bill would require the office, on or before July 1, 2026, to map the eligible urban infill sites within every incorporated city in the state, as provided. The bill would require the office, on or before July 1, 2026, to prepare, develop, and transmit to the agency for certification and adoption refinements to the infill development project categorical exemption, as provided. The bill would provide that specified regulations related to the significant effect exception to the use of a categorical exemption do not apply to an infill project that meets all conditions of the infill development project categorical exemption. The bill would require, if an infill project is not eligible for the infill development project categorical exemption, only the reasons for the ineligibility be subject to CEQA review. The bill would provide that these provisions do not apply to a project to construct or that is related to a distribution center or oil and gas infrastructure.
CEQA requires an action or proceeding to attack, review, set aside, void, or annul certain acts or decisions of a public agency to be commenced according to specified processes, including that at the time that the action or proceeding is filed, the plaintiff or petitioner shall file a request that the respondent public agency prepare the record of proceedings relating to the subject of the action or proceeding, and requires the record of proceedings to include specified items and materials, including, among other things, all internal agency communications, including staff notes and memoranda related to the project or to compliance with CEQA, but excluding communications that are of a logistical nature, as specified.
This bill would also exclude communications of persons tangential to or far removed from project decisionmaking from the materials to be included in the record of proceedings, except as provided.
This bill would require, except as provided, if an action or proceeding alleging that a lead agency improperly applied to a project a statutory or categorical exemption is successful, the subsequent environmental review for the project be limited to the facts the action or proceeding relied upon that disqualified the project from the statutory or categorical exemption.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(a)Except as provided in subdivision (b) and except for the necessity to finance its interim system of buses and ferries, as described in Section 27551, or the necessity to finance capital improvements or modifications relating to seismic safety of the bridge, the district shall not issue general obligation bonds, revenue bonds, or any other form of long-term indebtedness.
(b)Notwithstanding subdivision (a) or any provision of Part 3 (commencing with Section 27000) of Division 16, the district may accept contributions or loans from the United States or this state or any of its political subdivisions, or any department, instrumentality, agency, or authority of either thereof, for the purpose of financing capital improvements or modifications relating to seismic safety of the bridge. The district may authorize the acceptance of those contributions or loans by resolution, which shall specify the purposes for which the contribution or loan is being accepted, the maximum principal amount of the loan, the maximum duration of the loan, and the maximum rate of interest to be payable on the loan, as applicable. The district may do any and all things necessary in order to avail itself of that aid, assistance, and cooperation under any federal or state legislation now or hereafter enacted, including pledging toll revenues for the repayment of those loans and entering into contracts ancillary to those loans. Any evidence of indebtedness issued under this section shall constitute a negotiable instrument. This subdivision is a complete, additional, and alternative method for the district to authorize and accept a contribution or loan from an entity for the purposes specified herein and shall be regarded as supplemental and additional to all other powers conferred to the district by law.
(a)Except as provided in subdivision (b) and except for the necessity to finance its interim system of buses and ferries, as described in Section 27551, or the necessity to finance capital improvements or modifications relating to seismic safety of the bridge, the district shall not issue general obligation bonds, revenue bonds, or any other form of long-term indebtedness.
(b)Notwithstanding subdivision (a) or any provision of Part 3 (commencing with Section 27000) of Division 16, the district may accept contributions or loans from the United States or this state or any of its political subdivisions, or any department, instrumentality, agency, or authority of either thereof, for the purpose of financing capital improvements or modifications relating to seismic safety of the bridge. The district may authorize the acceptance of those contributions or loans by resolution, which shall specify the purposes for which the contribution or loan is being accepted, the maximum principal amount of the loan, the maximum duration of the loan, and the maximum rate of interest to be payable on the loan, as applicable. The district may do any and all things necessary in order to avail itself of that aid, assistance, and cooperation under any federal or state legislation now or hereafter enacted, including pledging toll revenues for the repayment of those loans and entering into contracts ancillary to those loans. Any evidence of indebtedness issued under this section shall constitute a negotiable instrument. This subdivision is a complete, additional, and alternative method for the district to authorize and accept a contribution or loan from an entity for the purposes specified herein and shall be regarded as supplemental and additional to all other powers conferred to the district by law.
(a)Except as provided in subdivision (b) and except for the necessity to finance its interim system of buses and ferries, as described in Section 27551, or the necessity to finance capital improvements or modifications relating to seismic safety of the bridge, the district shall not issue general obligation bonds, revenue bonds, or any other form of long-term indebtedness.
(b)Notwithstanding subdivision (a) or any provision of Part 3 (commencing with Section 27000) of Division 16, the district may accept contributions or loans from the United States or this state or any of its political subdivisions, or any department, instrumentality, agency, or authority of either thereof, for the purpose of financing capital improvements or modifications relating to seismic safety of the bridge. The district may authorize the acceptance of those contributions or loans by resolution, which shall specify the purposes for which the contribution or loan is being accepted, the maximum principal amount of the loan, the maximum duration of the loan, and the maximum rate of interest to be payable on the loan, as applicable. The district may do any and all things necessary in order to avail itself of that aid, assistance, and cooperation under any federal or state legislation now or hereafter enacted, including pledging toll revenues for the repayment of those loans and entering into contracts ancillary to those loans. Any evidence of indebtedness issued under this section shall constitute a negotiable instrument. This subdivision is a complete, additional, and alternative method for the district to authorize and accept a contribution or loan from an entity for the purposes specified herein and shall be regarded as supplemental and additional to all other powers conferred to the district by law.
(a)Except as provided in subdivision (b) and except for the necessity to finance its interim system of buses and ferries, as described in Section 27551, or the necessity to finance capital improvements or modifications relating to seismic safety of the bridge, the district shall not issue general obligation bonds, revenue bonds, or any other form of long-term indebtedness.
(b)Notwithstanding subdivision (a) or any provision of Part 3 (commencing with Section 27000) of Division 16, the district may accept contributions or loans from the United States or this state or any of its political subdivisions, or any department, instrumentality, agency, or authority of either thereof, for the purpose of financing capital improvements or modifications relating to seismic safety of the bridge. The district may authorize the acceptance of those contributions or loans by resolution, which shall specify the purposes for which the contribution or loan is being accepted, the maximum principal amount of the loan, and the maximum rate of interest to be payable on the loan, as applicable. The district may do any and all things necessary in order to avail itself of that aid, assistance, and cooperation under any federal or state legislation now or hereafter enacted, including pledging toll revenues for the repayment of those loans and entering into contracts ancillary to those loans. Any evidence of indebtedness issued under this section shall constitute a negotiable instrument. This subdivision is a complete, additional, and alternative method for the district to authorize and accept a contribution or loan from an entity for the purposes specified herein and shall be regarded as supplemental and additional to all other powers conferred to the district by law.
SECTION 1.Section 92900 of the Education Code is amended to read:92900.(a)The Regents of the University of California may establish four California Institutes for Science and Innovation at separate campuses of the University of California for the purpose of combining technological and scientific research and training and educating future scientists and technological leaders.(b)Each institute shall be created pursuant to a competitive application process conducted by a panel selected by the Governor and administered by the University of California.(c)In order to use the vast array of research and intellectual resources available from throughout the state, each institute may develop programs in cooperation with the private sector and with Californias other public and independent colleges and universities.(d)The concentration of each institute may include, but shall not be limited to, any of the following:(1)Medicine.(2)Bioengineering.(3)Telecommunications and information systems.(4)Energy resources.(5)Space.(6)Agricultural technology.(7)Artificial intelligence.(e)Funding for the states share of operating and facilities costs under this chapter is subject to appropriation in the annual Budget Act. REVISIONS: HeadingLine 2.(a)The Regents of the University of California may establish four California Institutes for Science and Innovation at separate campuses of the University of California for the purpose of combining technological and scientific research and training and educating future scientists and technological leaders.
(b)Each institute shall be created pursuant to a competitive application process conducted by a panel selected by the Governor and administered by the University of California.
(c)In order to utilize use the vast array of research and intellectual resources available from throughout the state, each institute may develop programs in cooperation with the private sector and with Californias other public and independent colleges and universities.
(d)The concentration of each institute may include, but shall not necessarily be limited to, any of the following:
(1)Medicine.
(2)Bioengineering.
(3)Telecommunications and information systems.
(4)Energy resources.
(5)Space.
(6)Agricultural technology.
(7)Artificial intelligence.
(e)Funding for the states share of operating and facilities costs under this chapter is subject to appropriation in the annual Budget Act.
All matter omitted in this version of the bill appears in the bill as amended in the Senate, September 12, 2025. (JR11)The People of California find and declare the following:
(a)Since World War II, the United States has been a global leader in scientific and health research and innovation. Through the financial support of governmental agencies including, but not limited to, the National Science Foundation (NSF), the National Institutes of Health (NIH), the United States Food and Drug Administration (FDA), the federal Centers for Disease Control and Prevention (CDC), and the National Oceanic and Atmospheric Administration (NOAA), the scientific and health communities have been able to create life-enhancing scientific, biomedical, and public health discoveries.
(b)Americans have benefited enormously from that research with improved health, cures for diseases, vaccines, and improved air quality and environment. The United States economy has benefited greatly from that research as well.
(c)California produces an astonishing share of the top scientific research on the planet. It is estimated that $3 of every $10 in federal research investments are drawn to California. The state accounts for about 47 percent of United States biotechnology research and development spending and generates about 53 percent of the nations biotechnology revenues. Nearly one-half of all venture capital in the United States is invested in California. That success is driven in large part by the states world-class universities and research institutions. The University of California is the top research institution in the world for United States patent generation. Every dollar invested in science funding generates more than $2 in economic activity.
(d)Despite the benefits to the country and the state, the Trump Administration has repeatedly sought major budget cuts to federal science agencies, including the NSF, the NIH, the CDC, the NOAA, the FDA, the National Weather Service, and the National Aeronautics and Space Administration. The Trump administration has sought to scale back or eliminate specific programs, for example, in climate science, environmental research, and pandemic preparedness.
(e)The Trump administration has disrupted lifesaving medical research by freezing federal grants and proposing deep cuts to health and science agencies. These actions have stalled work on heart disease, Alzheimers disease, HIV/AIDS, health disparities for at-risk communities, and cancer, and have raised fears that political interference could undermine the United Statess and Californias role as leaders in scientific research innovation.
(f)The Trump administrations interference with scientific advisory panels and public health guidance has raised serious concerns within the research community. Critics argue that these actions have undermined the United States scientific capacity and has threatened the United States and Californias continued leadership in biomedical, environmental, and public health research.
(g)Federal research funding has been integral in supporting the work of public and private research institutions in California. For example, federal funding supports a significant part of the University of Californias (UC) and California State Universitys (CSU) research operations. Federal grants pay for faculty research and the salaries of graduate and postdoctoral student researchers. Federal research grants totaled more than $5,000,000,000 to the University of California in the 202324 fiscal year. Public and private university research has led to the founding of thousands of startups, driving economic expansion and technological innovation. Federal funding reductions limit research opportunities and may impede Californias competitiveness and economic progress.
(h)The Trump administration has now directed its antiscience and punitive agenda squarely against California. In July 2025, the University of California, Los Angeles (UCLA) received notice that the federal government, through its control of the NSF, NIH, and the United States Department of Energy, is suspending certain research funding to UCLA. This is not only a loss to the researchers who rely on critical grants. It is a loss for Americans across the nation whose work, health, and future depend on the groundbreaking work done in California.
(i)As of late August 2025, the Trump administration has frozen or suspended approximately $584,000,000 in federal research grants to UCLA. The Trump administration has demanded $1,000,000,000 in fine payments to unfreeze federal funding. According to UC leaders and California officials, a $1,000,000,000 payment to the Trump administration would completely devastate the UC system. A prolonged funding impasse could jeopardize thousands of critical research projects in medicine, engineering, and biosciences. Programs at risk include life-saving research in cancer treatment, disease diagnostics, chronic diseases, climate science, and earthquake preparedness.
(j)Because the federal government has been one of the largest funders of scientific research in California, foundations, nonprofits, and corporations cannot make up the gap alone. Unless the people of California rise up, much of this critical work may come to a halt.
(k)The people of California propose this ballot measure to create the California Foundation for Science and Health Research (the Foundation) to award grants and make loans to public and private universities, research companies, institutes, and health care organizations in California for scientific and health care research and development.
(l)Through the Foundation, funding would be distributed to UC, CSU, other California universities, and public and private entities engaged in critical science and health research. It would provide funding for staff, equipment, and facilities needed to carry out scientific research in fields including, but not limited to, public health, mental health, heart disease, cancer treatment, diabetes, Alzheimers disease, strokes, child and adult leukemia, infectious diseases, and HIV/AIDS. Priority would be given to established research projects where the federal government has canceled funding. The measure would require annual audits.
(m)This measure will help preserve Californias position as a global leader in scientific innovation. This measure would allow important research to continue regardless of what happens at the federal level. This measure will ensure that California is not left behind.
(n)This measure will help sustain and grow the workforce of the state, with runoff economic benefits that will ensure a thriving future for Californians. This measure will support thousands of students and researchers at California universities in good-paying union jobs in growing industries. Supporting good-paying jobs in science, technology, engineering, and mathematics will help keep California economically competitive and generate billions of dollars each year in economic growth.
(o)There is some science that only public institutions will take on, for example cancer drug trials that combine drugs from different pharmaceutical companies, or as yet, unproven technologies in renewable energy. This measure would continue funding scientific research that looks beyond the profit motive for the greater good.
(p)Californias university and college system is a model for universities everywhere, involving students closely in practical, life-saving research. Cuts to federal funding threaten our students ability to learn the research skills they need to succeed. This measure will preserve Californias university and college system as a pathway to the middle class for California students.
(q)Too many Californians are driven into homelessness by drug abuse and mental health issues. This measure will help address this problem by continuing to fund critical research on promising mental health and addiction treatments.
(r)This measure contains strict fiscal accountability and transparency standards, including annual independent audits and public disclosure of all funding to ensure that Legislative allocations and bond funding is spent effectively, efficiently, and as promised.
SEC. 2.Chapter 12 (commencing with Section 11899) is added to Part 1 of Division 3 of Title 2 of the Government Code, to read:12.California Science and Health Research Bond Act1.California Foundation for Science and Health Research11899.As used in this chapter, the following terms have the following meaning:
(a)Act means the California Science and Health Research Bond Act constituting this chapter.
(b)Committee means the California Foundation for Science and Health Research Finance Committee created pursuant to subdivision (a) of Section 11899.16.
(c)Council means the California Foundation for Science and Health Research Finance Council created pursuant to subdivision (a) of Section 11899.3.
(d)Foundation means the California Foundation for Science and Health Research established pursuant to subdivision (a) of Section 11899.1.
(e)Fund means the California Foundation for Science and Health Research Fund created pursuant to Section 11899.2.
(f)Interim debt means any interim loans pursuant to Sections 11899.20 and 11899.21, bond anticipation notes or commercial paper notes issued to make deposits into the fund, and which will be paid from the proceeds of bonds issued pursuant to Article 2 (commencing with Section 11899.10).
11899.1.(a)The California Foundation for Science and Health Research is established within the Government Operations Agency.
(b)The foundations role is to facilitate scientific research by awarding grants and making loans to public or private research companies, universities, institutes, and organizations for scientific research and development and to construct facilities for research and development, including, but not limited to, any of the following fields:
(1)Biomedical, including finding cures for high mortality diseases, including, but not limited to, cancer, Alzheimers disease, heart disease, strokes, child and adult leukemia, infectious diseases, and HIV/AIDS.
(2)Detecting and responding to new and emerging health threats.
(3)Disease prevention, including, but not limited to, cancer, Alzheimers disease, heart disease, strokes, child and adult leukemia, infectious diseases, and HIV/AIDS.
(4)Promoting healthy and safe behaviors, communities, and environment.
(5)Wildfire prevention.
(6)Addiction and substance use.
(7)Behavioral.
(8)Climate, including climate change and its impact on human health.
(9)Weather.
(10)Ocean.
(11)Coastal and marine ecosystems and resources.
(12)Emerging technologies.
(13)Safety, efficacy, and security of drugs, biological products, medical devices, our nations food supply, and cosmetics.
11899.2.(a)(1)Upon appropriation by the Legislature, funds shall be deposited into the California Foundation for Science and Health Research Fund, which is hereby created in the State Treasury.
(2)The California Foundation for Science and Health Research Fund may be funded by both private and public funds, including private donations.
(b)The proceeds of interim debt and bonds issued and sold pursuant to Article 2 (commencing with Section 11899.10) shall be deposited into the State Treasury to the credit of the California Foundation for Science and Health Research Fund, except as stated in Section 11899.13.
(c)Moneys in the fund shall be used by the foundation to award public and private grants and make loans to public or private research companies, universities, institutes, and organizations for scientific research and development, including, but not limited to, research in any of the fields described in subdivision (b) of Section 11899.1.
(d)(1)All research and development funded by the fund shall be conducted under established standards of open scientific exchange, peer review, and public oversight.
(2)All grants or loans provided under this section shall be awarded or made available to researchers or projects located within this state, except that funding for research collaboratives between California and out-of-state researchers shall be permitted.
(3)All grants or loans provided under this section shall be awarded based on both of the following:
(A)Consistency with the research priorities established for the foundation by the California Foundation for Science and Health Research Council as described in subdivision (a) of Section 11899.3.
(B)The scientific merit of the proposed research, as determined by an open, competitive, scientific peer review process that ensures objectivity, consistency, and high quality, as described in subdivision (e) of Section 11899.3.
(4)The foundation shall prioritize funding research that replaces funding cuts by the federal government.
(5)To be eligible for funding, all research projects submitted for potential funding shall be reviewed and approved by an institutional review board that meets the requirements of applicable laws and regulations.
(e)The Secretary of Government Operations shall oversee the process of appointing the director of the foundation and shall set the level of salaries, bonuses, and benefits for the director. The task of hiring and determining the salaries, bonuses, and benefits of additional personnel may be delegated by the Secretary to the director, subject to approval and oversight by the Secretary.
(f)Not more than three percent of the moneys in the fund shall be used for administrative costs. Administrative costs include, but are not limited to, all of the following:
(1)Salaries, bonuses, and benefits paid or incurred with respect to the hiring or retention of a director of the foundation and other officers and administrative staff that shall work on behalf of the foundation under the supervision of the director.
(2)Legal and accounting fees and expenses.
(3)All costs associated with the establishment and operation of the foundation, including, but not limited to, office rent, overhead, information technology and data systems, office supplies and equipment, clerical services, utilities, telephone, travel, repairs and maintenance, program audits, and other general costs of operating the foundation.
(g)All intellectual property assets developed using funds authorized for, or made available to, the foundation shall be treated pursuant to state and federal law.
11899.3.(a)There is hereby established the California Foundation for Science and Health Research Council that shall do all of the following:
(1)Develop the strategic objectives and research priorities of the foundation.
(2)Actively participate in the overall management of the foundation.
(3)Determine which research projects will be funded by the fund based on the research priorities established for the foundation pursuant to paragraph (1) and the technical merits of the proposals, as determined by scientific peer review panels created pursuant to subdivision (e).
(4)Determine which state agency will oversee a research project funded by the fund, including, but not limited to:
(A)Office of Emergency Services.
(B)Natural Resources Agency.
(C)California Health and Human Services Agency.
(b)(1)The council shall consist of 10 to 13 members appointed by the Secretary of Government Operations.
(A)A majority of members of the council shall be scientists, including at least one member who is a graduate-level researcher and at least one member who is a postdoctoral scholar, with current or past research experience in the fields described in subdivision (b) of Section 11899.1.
(B)At least two members of the council shall be members of the public.
(C)One representative designated by the President of the University of California, if the president chooses to designate a representative.
(D)One representative designated by the Chancellor of the California State University, if the chancellor chooses to designate a representative.
(2)(A)Individuals and organizations may submit nominations for membership to the Secretary of Government Operations.
(B)The Secretary of Government Operations may solicit nominations from relevant organizations and individuals.
(c)(1)The members of the council shall serve four-year terms. A member shall serve a maximum of two terms.
(2)If a vacancy occurs within a term, the Secretary of Government Operations shall appoint a replacement member within 45 days to serve the remainder of the term.
(3)A vacancy affecting the proportional representation shall be filled before grants are approved.
(4)When a term expires, the Secretary of Government Operations shall appoint a member within 30 days. A member shall serve until their replacement is appointed.
(d)(1)A vote of a majority of the members of the council shall be required for the approval of funding of any research project or proposal presented for funding.
(2)The council shall contain the proportional representation of appointees described in paragraph (1) of subdivision (b) when the council approves the funding of research grants.
(e)(1)The council may establish one or more scientific peer review panels consisting of experts in the fields described in subdivision (b) of Section 11899.1 for the purposes of reviewing and prioritizing proposals on the basis of the track record of the researchers and investigators, scientific merit of the proposal, and potential benefits to the health and well-being of the population, natural resources, and environment of the state.
(2)An expert on a scientific review panel shall not have a collaborative or commercial relationship with any applicant of a proposal for funding that the expert is reviewing and prioritizing pursuant to paragraph (1).
(f)Council members shall serve without compensation, but may receive reimbursement for travel and necessary expenses actually incurred in the performance of their duties.
11899.4.(a)The foundation shall issue an annual report that sets forth the foundations activities, grants awarded, grants in progress, research accomplishments, and future program directions. The annual report shall be published on the foundations internet website.
(b)Each annual report shall include, but not be limited to, all of the following:
(1)The number and dollar amounts of research and facilities grants.
(2)The grantees for the prior year.
(3)The foundations administrative expenses.
(4)An assessment of the availability of funding for research from sources other than the foundation.
(5)A summary of research findings, including promising new research areas.
(6)An assessment of the relationship between the foundations grants and the overall strategy of its research program.
(7)A report of the foundations strategic research and financial plans.
11899.5.The foundation shall annually commission an independent financial audit of its activities from a certified public accounting firm, which shall be provided to the Controller, who shall review the audit and annually issue a public report of that review. The Controller shall hold a public meeting with appropriate notice and a formal public comment period. The Controller shall evaluate public comments and shall include appropriate summaries in the annual report.
11899.6.(a)The Bagley-Keene Open Meeting Act (Article 9 (commencing with Section 11120) of Chapter 1) shall apply to all meetings of the foundation, except as otherwise provided in this section. The foundation shall disclose all awarded grants in public meetings, shall award all grants, loans, and contracts in public meetings, and shall adopt all governance, scientific, medical, and regulatory standards in public meetings.
(b)The foundation may conduct closed sessions as permitted by the Bagley-Keene Open Meeting Act (Article 9 (commencing with Section 11120) of Chapter 1) under Section 11126. In addition, the foundation may conduct closed sessions when it meets to consider or discuss any of the following:
(1)Matters involving information relating to patients or medical or scientific research subjects, the disclosure of which would constitute an unwarranted invasion of personal privacy.
(2)Matters involving confidential intellectual property or a work product, whether patentable or not, including, but not limited to, any formula, plan, pattern, process, tool, mechanism, compound, procedure, production data, or compilation of information that is not patented, that is known only to certain individuals who are using it to fabricate, produce, or compound an article of trade or a service having commercial value, and that gives its user an opportunity to obtain a business advantage over competitors who do not know it or use it.
(3)Matters involving scientific data, analyses, or other research products not yet formally published in academic literature.
(4)Matters concerning the appointment, employment, performance, compensation, or dismissal of foundation officers and employees. Action on compensation of the foundations officers and employees shall only be taken in open session.
(5)Matters believed to pose a security risk to the people of California.
2.California Foundation for Science and Health Research Bonds11899.10.The proceeds of bonds, excluding those issued in accordance with Section 11899.23, issued and sold pursuant to this article shall be deposited into the California Foundation for Science and Health Research Fund. All moneys in the fund, notwithstanding Section 13340, are hereby continuously appropriated without respect to fiscal years for the purposes of this chapter.
11899.11.The sum of ____ dollars ($____) shall be available for grants and loans to fund the construction and acquisition of facilities for research as provided in this chapter.
11899.12.(a)The sum of ____ dollars ($____) shall be available for all of the following:
(1)Grants and loans to fund research and operate and maintain facilities for research as provided in this chapter.
(2)Paying general administrative costs of the foundation, not to exceed 3 percent of the net proceeds of each sale of bonds.
(3)Paying the annual administration costs of the interim debt or bonds after December 31 of the fifth full calendar year after this article takes effect.
(4)Paying the costs of issuing interim debt, paying the annual administration costs of the interim debt until and including December 31 of the fifth full calendar year after this article takes effect, and paying interest on interim debt, if that interim debt is incurred or issued on or before December 31 of the fifth full calendar year after this article takes effect.
(5)Paying the costs of issuing bonds, paying the annual administration costs of the bonds until and including December 31 of the fifth full calendar year after this article takes effect, and paying interest on bonds that accrues on or before December 31 of the fifth full calendar year after this article takes effect, except that this limitation does not apply to premium and accrued interest as provided in Section 11899.22.
(6)Moneys in the fund or other proceeds of the sale of bonds authorized by this article may be used to pay principal of or redemption premium on any interim debt issued before the issuance of bonds authorized by this article. Moneys deposited into the fund from the proceeds of interim debt may be used to pay general administrative costs of the foundation without regard to the 3-percent limit set forth in paragraph (2), so long as the 3-percent limit is satisfied for each issue of bonds.
(b)Repayment of principal and interest on any loans made by the foundation pursuant to this article shall be deposited into the fund and used to make additional grants and loans for the purposes of this act or for paying continuing costs of the annual administration of outstanding bonds.
(c)Costs allowable under this section include costs incidentally but directly related to construction or acquisition, including, but not limited to, planning, engineering, construction management, architectural, and other design work, environmental impact reports and assessments, required mitigation expenses, appraisals, legal expenses, site acquisitions, and necessary easements.
11899.13.The proceeds of interim debt and bonds issued and sold pursuant to this article shall be deposited into the State Treasury to the credit of the California Foundation for Science and Health Research Fund, except to the extent that proceeds of the issuance of bonds are used directly to repay interim debt.
11899.14.(a)Bonds in the total amount of twenty-three billion dollars ($23,000,000,000), not including the amount of any refunding bonds issued in accordance with Section 11899.23, may be issued and sold for the purposes expressed in this article and to reimburse the General Obligation Bond Expense Revolving Fund pursuant to Section 16724.5. The bonds, when sold, issued, and delivered, shall be and constitute a valid and binding obligation of the State of California, and the full faith and credit of the State of California is hereby pledged for the punctual payment of both the principal of, and interest on, the bonds as the principal and interest become due and payable.
(b)The Treasurer shall issue and sell the bonds authorized in subdivision (a) in the amount determined by the committee to be necessary or desirable pursuant to Section 11899.15. The bonds shall be issued and sold upon the terms and conditions specified in a resolution to be adopted by the committee pursuant to Section 16731.
11899.15.(a)The bonds authorized by this article shall be prepared, executed, issued, sold, paid, and redeemed as provided in the State General Obligation Bond Law (Chapter 4 (commencing with Section 16720) of Part 3 of Division 4), as amended from time to time, and all of the provisions of that law apply to the bonds and to this article and are hereby incorporated in this article as though set forth in full in this article, except that subdivisions (a) and (b) of Section 16727 shall not apply.
(b)For purposes of this article, the references to committee in the State General Obligation Bond Law shall mean the California Foundation for Science and Health Research Finance Committee created in Section 11899.16, and the references to board in the State General Obligation Bond Law shall mean the California Foundation for Science and Health Research.
11899.16.(a)Solely for the purpose of authorizing the issuance and sale, pursuant to the State General Obligation Bond Law, of the bonds and interim debt authorized by this article, the California Foundation for Science and Health Research Finance Committee is hereby created.
(b)(1)The committee consists of all of the following:
(A)The Treasurer.
(B)The Controller.
(C)The Director of Finance.
(D)The Director of the California Foundation for Science and Health Research.
(E)Two members of the California Foundation for Science and Health Research Council, chosen by the Secretary of Government Operations, or their designated representatives.
(2)The Treasurer shall serve as chairperson of the committee. A majority of the committee may act for the committee.
11899.17.(a)The committee, by resolution, shall determine whether or not it is necessary or desirable to issue and sell bonds authorized pursuant to this article in order to carry out the actions specified in this article and, if so, the amount of bonds to be issued and sold. Successive issues of bonds may be authorized and sold to carry out those actions progressively, and it is not necessary that all of the bonds authorized to be issued be sold at any one time. The bonds may bear interest, which is includable in gross income for federal income tax purposes if the committee determines that the treatment is necessary in order to provide funds for the purposes of the act.
(b)An interest-only floating rate bond structure will be implemented for interim debt and bonds until at least December 31 of the fifth full calendar year after this article takes effect, with all interest to be paid from proceeds from the sale of interim debt or bonds, to minimize debt service payable from the General Fund during the initial period of basic research and development, if the committee determines, with the advice of the Treasurer, that this structure will result in the lowest achievable borrowing costs for the state during that five-year period considering the objective of avoiding any bond debt service payments, by the General Fund, during that period. Upon the initial determination, the committee may delegate, by resolution, to the Treasurer the authority in connection with issuance of bonds as it may determine, including, but not limited to, the authority to do both of the following:
(1)Implement and continue the bond financing structure established by this article, including during any time following the initial five-year period.
(2)Determine that an alternative financing plan would result in significant lower borrowing costs for the state consistent with the objectives related to the General Fund and to implement that alternative financing plan.
11899.18.There shall be collected each year and in the same manner and at the same time as other state revenue is collected, in addition to the ordinary revenues of the state, a sum in an amount required to pay the principal of, and interest on, the bonds becoming due each year. It is the duty of all officers charged by law with any duty in regard to the collection of the revenue to do and perform each and every act that is necessary to collect that additional sum.
11899.19.Notwithstanding Section 13340, there is hereby continuously appropriated from the General Fund in the State Treasury, for the purposes of this article and without regard to fiscal years, an amount that equals the total of both of the following:
(a)The sum annually necessary to pay the principal of, and interest on, bonds issued and sold pursuant to this article, as the principal and interest become due and payable.
(b)The sum necessary to carry out Section 11899.20.
11899.20.The foundation may request the Pooled Money Investment Board to make a loan from the Pooled Money Investment Account, in accordance with Section 16312, for the purposes of carrying out this article less any amount withdrawn pursuant to Section 11899.21 and not yet returned to the General Fund. The amount of the request shall not exceed the amount of the unsold bonds that the committee, by resolution, has authorized to be sold for the purpose of carrying out this article, excluding any refunding bonds authorized pursuant to Section 11899.23, less any amount loaned pursuant to this section and not yet repaid and any amount withdrawn from the General Fund pursuant to Section 11899.21 and not yet returned to the General Fund. The foundation shall execute any documents required by the Pooled Money Investment Board to obtain and repay the loan. Any amounts loaned shall be deposited into the fund to be allocated by the foundation in accordance with this article.
11899.21.For the purposes of carrying out this article, the Director of Finance may authorize the withdrawal from the General Fund of an amount, not to exceed the amount of the unsold bonds that have been authorized by the committee, to be sold for the purpose of carrying out this article, excluding any refunding bonds authorized pursuant to Section 11899.23, less any amount loaned pursuant to Section 11899.20 and not yet repaid, and any amount withdrawn from the General Fund pursuant to this section and not yet returned to the General Fund. Any amount withdrawn shall be deposited into the fund. Any moneys made available under this section shall be returned to the General Fund, with interest at the rate earned by the moneys in the Pooled Money Investment Account, from proceeds received from the sale of bonds for the purpose of carrying out this article.
11899.22.All moneys deposited into the fund that are derived from premium and accrued interest on bonds sold pursuant to this article shall be reserved in the fund and shall be available for transfer to the General Fund as a credit to expenditures for bond interest, except those amounts derived from premium may be reserved and used to pay the cost of bond issuance before any transfer to the General Fund.
11899.23.The bonds issued and sold pursuant to this article may be refunded in accordance with Article 6 (commencing with Section 16780) of Chapter 4 of Part 3 of Division 4, which is a part of the State General Obligation Bond Law. Approval by the voters of the state for the issuance of the bonds described in this article includes the approval of the issuance of any bonds issued to refund any bonds originally issued under this article or any previously issued refunding bonds. Any bond refunded with the proceeds of refunding bonds as authorized by this section may be legally defeased to the extent permitted by law in the manner and to the extent set forth in the resolution, as amended from time to time, authorizing that refunded bond.
11899.24.Notwithstanding any provision of this article or the State General Obligation Bond Law, if the Treasurer sells bonds pursuant to this article that include a bond counsel opinion to the effect that the interest on the bonds is excluded from gross income for federal tax purposes, under designated conditions, or is otherwise entitled to any federal tax advantage, the Treasurer may maintain separate accounts for the investment of bond proceeds and for the investment of earnings on those proceeds. The Treasurer may use or direct the use of those proceeds or earnings to pay any rebate, penalty, or other payment required under federal law or to take any other action with respect to the investment and use of bond proceeds or earnings required or desirable under federal law to maintain the tax-exempt status of those bonds and to obtain any other advantage under federal law on behalf of the funds of this state.
11899.25.The proceeds from the sale of bonds authorized by this article are not proceeds of taxes as that term is used in Article XIII B of the California Constitution, and the disbursement of these proceeds is not subject to the limitations imposed by that article.
SEC. 3.Section 2 of this act shall take effect upon the approval by the voters of the California Science and Health Research Bond Act, as set forth in Section 2 of this act.
SEC. 4.Section 2 of this act shall be submitted to the voters at the next statewide election in accordance with provisions of the Government Code and the Elections Code governing the submission of a statewide measure to the voters.
SEC. 5.This act shall be broadly construed to accomplish its purposes. The statutory provisions of the act may be amended so long as those amendments are consistent with and further the intent of this act by a statute that is passed by a two-thirds vote of the members of each house of the Legislature and signed by the Governor.
SEC. 6.The provisions of this act are severable. If any portion, section, subdivision, paragraph, clause, sentence, phrase, word, or application of this act is for any reason held to be invalid by a decision of any court of competent jurisdiction, that decision shall not affect the validity of the remaining portions of this act. The people of the State of California hereby declare that they would have adopted this act and each and every portion, section, subdivision, paragraph, clause, sentence, phrase, word, and application not declared invalid or unconstitutional without regard to whether any portion of this act or application thereof would be subsequently declared invalid.
SEC. 7.(a)This act shall be liberally construed to effectuate its purposes.
(b)If this measure is approved by the voters but superseded in whole or in part by a conflicting measure approved by the voters at the same election, and the conflicting measure is later held to be invalid, this measure shall be self-executing and given full force and effect.
SEC. 8.The Legislature finds and declares that Section 2 of this act, which adds Section 11899.6 to the Government Code, imposes a limitation on the publics right of access to the meetings of public bodies or the writings of public officials and agencies within the meaning of Section 3 of Article I of the California Constitution. Pursuant to that constitutional provision, the Legislature makes the following findings to demonstrate the interest protected by this limitation and the need for protecting that interest:
To protect the privacy rights and the intellectual property interests of individuals and the security of the public, it is necessary to restrict the publics access to this information.
SECTION 1.The Legislature finds and declares the following:(a)The California Environmental Quality Act provides communities across California with important safeguards against projects like fossil fuel plants and warehouses that have caused real environmental harm to residents of the state. Too often, it has resulted in delays to essential projects that are key to solving the states housing crisis and to strategic development that is necessary to maintain Californias position as the fourth largest economy in the world.(b)Over the last several years, the Legislature has enacted numerous provisions that streamline the California Environmental Quality Act, including, but not limited to, reforms to administrative records, court timelines, and the level of environmental review of projects in the areas of water, transportation, clean energy, and housing.SEC. 2.(a)(1)It is the intent of the Legislature to make necessary statutory changes to the California Environmental Quality Act to ensure the state meets its infrastructure needs and is more affordable for all Californians.(2)Specifically, the Legislature intends to enact legislation as part of the 2025 state budget process that expedites projects such as those that provide housing, clean energy jobs, and critical transportation and lead to economic development for hardworking California families. It is the intent of the Legislature to make communities more wildfire safe and expedite the ability of local governments to provide clean drinking water to all residents. It is the intent of the Legislature to ensure that critical projects are not delayed or impeded by the numerous outdated requirements in the California Environmental Quality Act, without compromising environmental protections.(b)It is the intent of the Legislature that no revisions shall be made to the California Environmental Quality Act for purposes of the Delta Conveyance Project.The Legislature finds and declares the following:
(a)The California Environmental Quality Act provides communities across California with important safeguards against projects like fossil fuel plants and warehouses that have caused real environmental harm to residents of the state. Too often, it has resulted in delays to essential projects that are key to solving the states housing crisis and to strategic development that is necessary to maintain Californias position as the fourth largest economy in the world.
(b)Over the last several years, the Legislature has enacted numerous provisions that streamline the California Environmental Quality Act, including, but not limited to, reforms to administrative records, court timelines, and the level of environmental review of projects in the areas of water, transportation, clean energy, and housing.
SEC. 2.(a)(1)It is the intent of the Legislature to make necessary statutory changes to the California Environmental Quality Act to ensure the state meets its infrastructure needs and is more affordable for all Californians.
(2)Specifically, the Legislature intends to enact legislation as part of the 2025 state budget process that expedites projects such as those that provide housing, clean energy jobs, and critical transportation and lead to economic development for hardworking California families. It is the intent of the Legislature to make communities more wildfire safe and expedite the ability of local governments to provide clean drinking water to all residents. It is the intent of the Legislature to ensure that critical projects are not delayed or impeded by the numerous outdated requirements in the California Environmental Quality Act, without compromising environmental protections.
(b)It is the intent of the Legislature that no revisions shall be made to the California Environmental Quality Act for purposes of the Delta Conveyance Project.
All matter omitted in this version of the bill appears in the bill as amended in the Senate, May 13, 2025. (JR11) CORRECTIONS: DigestPage 1.Distribution center means a warehouse distribution center, as defined in Section 2100 of the Labor Code, that is 50,000 square feet or larger.
SEC. 2.Section 21064 of the Public Resources Code is amended to read:21064.Negative declaration means a written statement briefly describing the reasons the lead agency has determined, based upon substantial evidence in the record, that the proposed project will not have a significant effect on the environment and does not require the preparation of an environmental impact report.
SEC. 3.Section 21064.1 is added to the Public Resources Code, to read:21064.1.May have a significant effect on the environment means that the public agency has determined, based upon substantial evidence in the record, that the proposed project is more likely than not to have a significant effect on the environment.
SEC. 4.Section 21064.5 of the Public Resources Code is amended to read:21064.5.Mitigated negative declaration means a negative declaration prepared for a project when the initial study has identified potentially significant effects on the environment, but (1) revisions in the project plans or proposals made by, or agreed to by, the applicant before the proposed negative declaration and initial study are released for public review would avoid the effects or mitigate the effects to a point where no significant effect on the environment would occur, as determined by the lead agency based upon substantial evidence in the record, and (2) the lead agency has determined, based upon substantial evidence in the record, that the project, as revised, will not have a significant effect on the environment.
SEC. 5.Section 21064.8 is added to the Public Resources Code, to read:21064.8.Oil and gas infrastructure means a facility used for the production, processing, transmission, storage, or distribution of petroleum or natural gas.
SEC. 6.Section 21067.5 is added to the Public Resources Code, to read:21067.5.Natural and protected lands means sites located within any of the following locations:
(a)The state park system, as described in Article 1 (commencing with Section 5001) of Chapter 1 of Division 5.
(b)A wilderness area, as defined in Section 5093.32.
(c)A marine protected area, as defined in Section 2852 of the Fish and Game Code.
(d)The national park system, as defined in Section 100102 of Title 54 of the United States Code.
(e)A national recreation area.
(f)A national monument.
(g)The national wild and scenic rivers system, as defined in Section 1273 of Title 16 of the United States Code.
(h)Any ecological reserve or wildlife management area acquired and managed by the Department of Fish and Wildlife pursuant to Article 2 (commencing with Section 1525) or Article 4 (commencing with Section 1580) of Chapter 5 of Division 2 of the Fish and Game Code.
(i)A hazardous waste site that is listed pursuant to Section 65962.5 of the Government Code or a hazardous waste site designated by the Department of Toxic Substances Control pursuant to Section 25356 of the Health and Safety Code, unless either of the following apply:
(1)The site is an underground storage tank site that received a uniform closure letter issued pursuant to subdivision (g) of Section 25296.10 of the Health and Safety Code based on closure criteria established by the State Water Resources Control Board for the use proposed by the project. This paragraph does not alter or change the conditions to remove a site from the list of hazardous waste sites listed pursuant to Section 65962.5 of the Government Code.
(2)The State Department of Public Health, State Water Resources Control Board, Department of Toxic Substances Control, or a local agency making a determination pursuant to subdivision (c) of Section 25296.10 of the Health and Safety Code has otherwise determined that the site is suitable for the use proposed by the project.
(j)Within a regulatory floodway as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency, unless the development has received a no-rise certification in accordance with Section 60.3(d)(3) of Title 44 of the Code of Federal Regulations.
(k)Lands under conservation easement.
(l)On, or within a 100-foot radius of, a wetland, as defined in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(m)An environmentally sensitive area within the coastal zone, as defined in Section 30107.5.
(n)Lands protected as preserve areas or reserve lands pursuant to an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code) or habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.).
SEC. 7.Section 21080 of the Public Resources Code is amended to read:21080.(a)Except as otherwise provided in this division, this division shall apply to discretionary projects proposed to be carried out or approved by public agencies, including, but not limited to, the enactment and amendment of zoning ordinances, the issuance of zoning variances, the issuance of conditional use permits, and the approval of tentative subdivision maps unless the project is exempt from this division.
(b)This division does not apply to any of the following activities:
(1)Ministerial projects proposed to be carried out or approved by public agencies.
(2)Emergency repairs to public service facilities necessary to maintain service.
(3)Projects undertaken, carried out, or approved by a public agency to maintain, repair, restore, demolish, or replace property or facilities damaged or destroyed as a result of a disaster in a disaster-stricken area in which a state of emergency has been proclaimed by the Governor pursuant to Chapter 7 (commencing with Section 8550) of Division 1 of Title 2 of the Government Code.
(4)Specific actions necessary to prevent or mitigate an emergency.
(5)Projects that a public agency rejects or disapproves.
(6)Actions undertaken by a public agency relating to any thermal powerplant site or facility, including the expenditure, obligation, or encumbrance of funds by a public agency for planning, engineering, or design purposes, or for the conditional sale or purchase of equipment, fuel, water (except groundwater), steam, or power for a thermal powerplant, if the powerplant site and related facility will be the subject of an environmental impact report, negative declaration, or other document, prepared pursuant to a regulatory program certified pursuant to Section 21080.5, which will be prepared by the State Energy Resources Conservation and Development Commission, by the Public Utilities Commission, or by the city or county in which the powerplant and related facility would be located if the environmental impact report, negative declaration, or document includes the environmental impact, if any, of the action described in this paragraph.
(7)Activities or approvals necessary to the bidding for, hosting or staging of, and funding or carrying out of, an Olympic Games under the authority of the International Olympic Committee, except for the construction of facilities necessary for the Olympic Games.
(8)The establishment, modification, structuring, restructuring, or approval of rates, tolls, fares, or other charges by public agencies that the public agency finds are for the purpose of: (A) meeting operating expenses, including employee wage rates and fringe benefits; (B) purchasing or leasing supplies, equipment, or materials; (C) meeting financial reserve needs and requirements; (D) obtaining funds for capital projects necessary to maintain service within existing service areas; or (E) obtaining funds necessary to maintain those intracity transfers as are authorized by city charter. The public agency shall incorporate written findings in the record of any proceeding in which an exemption under this paragraph is claimed setting forth with specificity the basis for the claim of exemption.
(9)All classes of projects designated pursuant to Section 21084.
(10)A project for the institution or increase of passenger or commuter services on rail or highway rights-of-way already in use, including modernization of existing stations and parking facilities. For purposes of this paragraph, highway has the same meaning as defined in Section 360 of the Vehicle Code.
(11)A project for the institution or increase of passenger or commuter service on high-occupancy vehicle lanes already in use, including the modernization of existing stations and parking facilities.
(12)Facility extensions not to exceed four miles in length that are required for the transfer of passengers from or to exclusive public mass transit guideway or busway public transit services.
(13)A project for the development of a regional transportation improvement program, the state transportation improvement program, or a congestion management program prepared pursuant to Section 65089 of the Government Code.
(14)A project or portion of a project located in another state that will be subject to environmental impact review pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. Sec. 4321 et seq.) or similar state laws of that state. Any emissions or discharges that would have a significant effect on the environment in this state are subject to this division.
(15)Projects undertaken by a local agency to implement a rule or regulation imposed by a state agency, board, or commission under a certified regulatory program pursuant to Section 21080.5. Any site-specific effect of the project that was not analyzed as a significant effect on the environment in the plan or other written documentation required by Section 21080.5 is subject to this division.
(16)Approval by the Department of Pesticide Regulation of a pesticide emergency exemption pursuant to Section 136p of Title 7 of the United States Code.
(c)(1)If a lead agency determines that a proposed project, not otherwise exempt from this division, would not have a significant effect on the environment, the lead agency shall adopt a negative declaration to that effect. The negative declaration shall be prepared for the proposed project in either of the following circumstances:
(A)The lead agency determines, based upon substantial evidence, in light of the whole record before the lead agency, that the project will not have a significant effect on the environment.
(B)An initial study identifies potentially significant effects on the environment, but: (i) revisions in the project plans or proposals made by, or agreed to by, the applicant before the proposed negative declaration and initial study are released for public review would avoid the effects or mitigate the effects to a point where no significant effect on the environment would occur, as determined by the public agency based upon substantial evidence on the record; and (ii) the lead agency has determined, based upon substantial evidence, in light of the whole record before the lead agency, that the project, as revised, will not have a significant effect on the environment.
(2)If the lead agency determines, based upon substantial evidence, in light of the whole record before the lead agency, that it is more likely than not that the project will have a significant effect on the environment, an environmental impact report shall be prepared.
(d)(1)Notwithstanding subdivision (c), an environmental impact report shall be prepared for a proposed project that includes a distribution center or oil and gas infrastructure, or that is located on natural and protected lands as defined pursuant to Section 21067.5, if there is substantial evidence, in light of the whole record before the lead agency, that the project could have a significant effect on the environment.
(2)The review of a proposed project that includes a distribution center or oil and gas infrastructure or that is located on natural and protected lands as defined pursuant to Section 21067.5 shall continue to be subject to the fair argument standard as it applied to those projects before January 1, 2026.
(e)(1)For purposes of this section and this division, substantial evidence includes fact, a reasonable assumption predicated upon fact, or expert opinion supported by fact.
(2)Substantial evidence is not argument, speculation, unsubstantiated opinion or narrative, evidence that is clearly inaccurate or erroneous, or evidence of social or economic impacts that do not contribute to, or are not caused by, physical impacts on the environment.
(f)As a result of the public review process for a mitigated negative declaration, including administrative decisions and public hearings, the lead agency may conclude that certain mitigation measures identified pursuant to subparagraph (B) of paragraph (1) of subdivision (c) are infeasible or otherwise undesirable. In those circumstances, the lead agency, before approving the project, may delete those mitigation measures and substitute for them other mitigation measures that the lead agency finds, after holding a public hearing on the matter, are equivalent or more effective in mitigating significant effects on the environment to a less than significant level and that do not cause any potentially significant effect on the environment. If those new mitigation measures are made conditions of project approval or are otherwise made part of the project approval, the deletion of the former measures and the substitution of the new mitigation measures shall not constitute an action or circumstance requiring recirculation of the mitigated negative declaration.
(g)This section does not preclude a project applicant or any other person from challenging, in an administrative or judicial proceeding, the legality of a condition of project approval imposed by the lead agency. If, however, any condition of project approval set aside by either an administrative body or court was necessary to avoid or lessen the likelihood of the occurrence of a significant effect on the environment, the lead agencys approval of the negative declaration and project shall be invalid and a new environmental review process shall be conducted before the project can be reapproved, unless the lead agency substitutes a new condition that the lead agency finds, after holding a public hearing on the matter, is equivalent to, or more effective in, lessening or avoiding significant effects on the environment and that does not cause any potentially significant effect on the environment.
SEC. 8.Section 21080.085 is added to the Public Resources Code, to read:21080.085.(a)This division does not apply to a rezoning that implements the schedule of actions contained in an approved housing element. element pursuant to subdivision (c) of Section 65583 of the Government Code.
(b)(1)Subdivision (a) does not apply to either of the following:
(A)A rezoning that would allow for the construction of a distribution center or for oil and gas infrastructure.
(B)A rezoning that would allow for construction to occur within the boundaries of any natural and protected lands as defined pursuant to Section 21067.5.
(2)(A)Subdivision (a) applies to a rezoning that includes contains within its boundaries any natural and protected lands as defined pursuant to Section 21067.5, or any portion thereof, that excludes 21067.5 if those natural and protected lands are excluded from the rezoning.
(B)The rezoning of any parcel or portions of a parcel that is excluded from a rezoning under this paragraph shall be a separate project that is subject to this division.
SEC. 9.Section 21080.1 of the Public Resources Code is amended to read:21080.1.(a)The lead agency shall be responsible for determining whether an environmental impact report, a negative declaration, or a mitigated negative declaration shall be required for any project that is subject to this division. That determination shall be final and conclusive on all persons, including responsible agencies, unless challenged as provided in Section 21167.
(b)(1)If a proposed project would otherwise be exempt from this division pursuant to a statutory exemption or a categorical exemption adopted before January 1, 2026, but for a single condition, the application of this division to the approval of the proposed project shall be limited to effects upon the environment that are caused solely by that single condition.
(2)An initial study or environmental impact report prepared for a project subject to this subdivision is only required to examine those effects that the lead agency determines, based upon substantial evidence in the record, are caused solely by the single condition that makes the proposed project ineligible for the statutory exemption or categorical exemption.
(3)An environmental impact report for a project subject to this subdivision is not required to include any discussion of alternatives to the project, cumulative impacts of the project, or the growth-inducing impacts of the project.
(4)This subdivision does not apply to any of the following projects:
(A)A proposed project that is not similar in kind to the projects listed in the statutory or categorical exemption.
(B)A proposed project that is ineligible for the statutory exemption or categorical exemption due to two or more conditions.
(C)A proposed project that is not consistent with applicable zoning designation and regulations, except for a housing development project, as defined in Section 65589.5 of the Government Code, that is proposed on a site identified as suitable or available for very low, low-, or moderate-income households in the local jurisdictions most recent adopted housing element that has been certified by the Department of Housing and Community Development to be in compliance with state law.
(D)A proposed project that includes a distribution center or oil and gas infrastructure.
(E)A proposed project located on natural and protected lands as defined pursuant to Section 21067.5.
(5)As used in this subdivision, condition means a physical feature of the project or an effect upon the environment caused by the project.
(c)In the case of a project described in subdivision (c) of Section 21065, the lead agency shall, upon the request of a potential applicant, provide for consultation before the filing of the application regarding the range of actions, potential alternatives, mitigation measures, and any potential and significant effects on the environment of the project.
SEC. 10.Section 21082.2 of the Public Resources Code is amended to read:21082.2.(a)The lead agency shall determine whether a project is more likely than not to have a significant effect on the environment based on substantial evidence in light of the whole record.
(b)The existence of public controversy over the environmental effects of a project shall not require preparation of an environmental impact report if an environmental impact report would not otherwise be required by this division.
(c)Argument, speculation, unsubstantiated opinion or narrative, evidence that is clearly inaccurate or erroneous, or evidence of social or economic impacts that do not contribute to, or are not caused by, physical impacts on the environment, is not substantial evidence. Substantial evidence shall include facts, reasonable assumptions predicated upon facts, and expert opinion supported by facts.
(d)If the lead agency determines, based upon substantial evidence, in light of the whole record before the lead agency, that it is more likely than not that a project will have a significant effect on the environment, an environmental impact report shall be prepared.
(e)Statements in an environmental impact report and comments with respect to an environmental impact report shall not be deemed determinative of whether the project may have a significant effect on the environment.
SEC. 11.Section 21083 of the Public Resources Code is amended to read:21083.(a)The Office of Land Use and Climate Innovation shall prepare and develop proposed guidelines for the implementation of this division by public agencies. The guidelines shall include objectives and criteria for the orderly evaluation of projects and the preparation of environmental impact reports and negative declarations in a manner consistent with this division.
(b)The guidelines shall specifically include criteria for public agencies to follow in determining whether or not a proposed project may have a significant effect on the environment. The criteria shall require a finding that a project may have a significant effect on the environment if the lead agency determines, based upon substantial evidence in the record, that one or more of the following conditions exists:
(1)A proposed project has the potential to degrade the quality of the environment, curtail the range of the environment, or to achieve short-term, to the disadvantage of long-term, environmental goals.
(2)The possible effects of a project are individually limited but cumulatively considerable. As used in this paragraph, cumulatively considerable means that the incremental effects of an individual project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects.
(3)The environmental effects of a project will cause substantial adverse effects on human beings, either directly or indirectly.
(c)The guidelines shall include procedures for determining the lead agency pursuant to Section 21165.
(d)The guidelines shall include criteria for public agencies to use in determining when a proposed project is of sufficient statewide, regional, or areawide environmental significance that a draft environmental impact report, a proposed negative declaration, or a proposed mitigated negative declaration shall be submitted to appropriate state agencies, through the State Clearinghouse, for review and comment prior to completion of the environmental impact report, negative declaration, or mitigated negative declaration.
(e)The Office of Land Use and Climate Innovation shall develop and prepare the proposed guidelines as soon as possible and shall transmit them immediately to the Secretary of the Natural Resources Agency. The Secretary of the Natural Resources Agency shall certify and adopt the guidelines pursuant to Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, which shall become effective upon the filing thereof. However, the guidelines shall not be adopted without compliance with Sections 11346.4, 11346.5, and 11346.8 of the Government Code.
(f)The Office of Land Use and Climate Innovation shall, at least once every two years, review the guidelines adopted pursuant to this section and shall recommend proposed changes or amendments to the Secretary of the Natural Resources Agency. The Secretary of the Natural Resources Agency shall certify and adopt guidelines, and any amendments thereto, at least once every two years, pursuant to Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, which shall become effective upon the filing thereof. However, guidelines may not be adopted or amended without compliance with Sections 11346.4, 11346.5, and 11346.8 of the Government Code.
SEC. 12.Section 21083.03 is added to the Public Resources Code, to read:21083.03.(a)On or before July 1, 2026, the Office of Land Use and Climate Innovation shall prepare, develop, and transmit to the Natural Resources Agency for certification and adoption an amendment to the Class 32 categorical exemption set forth in Section 15332 of Title 14 of the California Code of Regulations that establishes an alternative means of compliance with the requirements of that categorical exemption as follows:
(1)A housing development project, as defined in Section 65589.5 of the Government Code, that is not consistent with the applicable general plan designation, applicable general plan policies, or applicable zoning designation and regulations shall be in compliance with subdivision (a) of Section 15332 of Title 14 of the California Code of Regulations if the project is proposed on a site identified as suitable or available for very low, low-, or moderate-income households in the local jurisdictions most recent adopted housing element that has been certified by the Department of Housing and Community Development to be in compliance with state law. law and the project meets either of the following conditions:
(A)The project is consistent with the objective general plan standards and criteria but the zoning for the project site is inconsistent with the general plan.
(B)The project is consistent with the density specified in the most recently updated and adopted housing element, and that is inconsistent with both the jurisdictions zoning ordinance and general plan land use designation on the date the application was deemed complete.
(2)A project that does not occur within city limits on a project site of no more than five acres substantially surrounded by urban uses shall be in compliance with subdivision (b) of Section 15332 of Title 14 of the California Code of Regulations if the project occurs in either of the following locations:
(A)Within an urbanized area or urban cluster on a project site of no more than five acres substantially surrounded by urban uses.
(B)Within an area that the Office of Land Use and Climate Innovation has determined to be an eligible urban infill site pursuant to subdivision (c).
(3)(A)The amendment shall establish objective and measurable safe harbor thresholds that a lead agency may elect to use when making the determinations required under subdivisions (c), (d), and (e) of Section 15332 of Title 14 of the California Code of Regulations.
(B)A lead agency shall not be in violation of this division if the determinations required under subdivisions (c), (d), and (e) of Section 15332 of Title 14 of the California Code of Regulations were made in substantial compliance with thresholds adopted pursuant to this subdivision.
(C)The safe harbor thresholds adopted pursuant to this paragraph shall not be applicable to the review and consideration of a proposed project, and shall not be considered in an action or proceeding to attack, review, set aside, void, or annul a determination or decision related to a proposed project on the grounds of noncompliance with this division, unless the lead agency has expressly elected to use the safe harbor threshold for that project.
(4)The alternative means of compliance set forth in this subdivision shall not apply to a proposed project that includes a distribution center or oil and gas infrastructure.
(b)An amendment to Section 15332 of Title 14 of the California Code of Regulations adopted pursuant to this section shall not revise the requirements for exemption set forth in that section, except as provided in subdivision (a). A project that would be eligible for the Class 32 categorical exemption set forth in Section 15332 of Title 14 of the California Code of Regulations as it read on December 31, 2024, shall not be ineligible as the result of any amendment adopted pursuant to this section.
(c)On or before July 1, 2026, the Office of Land Use and Climate Innovation shall map the eligible urban infill sites within every urbanized area or urban cluster in the state where, notwithstanding that an area may or may not be substantially surrounded by urban uses, the local jurisdictions most recent general plan or most recently adopted housing element that has been certified by the Department of Housing and Community Development to be in compliance with state law has a zoning designation that is consistent with infill development. development and development on the parcel promotes compact development in order to accomplish one or more of the following goals:
(1)Reduce greenhouse gas emissions and improve regional air quality by reducing the distance people need to travel.
(2)Reduce conversion of agricultural land, sensitive habitat, and open space for new development.
(3)Facilitate healthy and environmentally-friendly active transportation.
(4)Reduce storm-water runoff resulting in flooding and pollution of waterways.
(5)Bring vibrancy, community, and social connection to neighborhoods.
(d)Subdivision (c) of Section 15300.2 of Title 14 of the California Code of Regulations does not apply to Section 15332 of Title 14 of the California Code of Regulations.
(e)(1)If a proposed project that is in compliance with subdivisions (a) and (b) of Section 15332 of Title 14 of the California Code of Regulations is otherwise ineligible for that categorical exemption due to one or more conditions, the application of this division to the approval of the proposed project shall be limited to the effects upon the environment that are caused solely by those conditions that make the project ineligible for the categorical exemption.
(2)For purposes of this subdivision, condition has the same meaning as in subdivision (b) of Section 21080.1.
(f)For purposes of this section, the following definitions apply:
(1)Urbanized area means an urbanized area designated by the United States Census Bureau, as published in the Federal Register, Volume 77, Number 59, on March 27, 2012.
(2)Urban cluster means an urban cluster designated by the United States Census Bureau, as published in the Federal Register, Volume 77, Number 59, on March 27, 2012.
(g)This section does not apply to a project that includes a distribution center or oil and gas infrastructure.
SEC. 13.Section 21167.6 of the Public Resources Code is amended to read:21167.6.Notwithstanding any other law, in all actions or proceedings brought pursuant to Section 21167, except as provided in Section 21167.6.2 or those involving the Public Utilities Commission, all of the following shall apply:
(a)At the time that the action or proceeding is filed, the plaintiff or petitioner shall file a request that the respondent public agency prepare the record of proceedings relating to the subject of the action or proceeding. The request, together with the complaint or petition, shall be served personally upon the public agency not later than 10 business days from the date that the action or proceeding was filed.
(b)(1)(A)The public agency shall prepare and certify the record of proceedings not later than 60 days from the date that the request specified in subdivision (a) was served upon the public agency. Upon certification, the public agency shall lodge an electronic copy of the record of proceedings with the court and shall serve on the parties notice that the record of proceedings has been certified and lodged with the court. The parties shall pay any reasonable costs or fees imposed for the preparation of the record of proceedings in conformance with any law or rule of court.
(B)The court shall schedule a case management conference within 30 days of the filing of the complaint or petition pursuant to this division to review the scope, timing, and cost of the record of proceedings. The parties may stipulate to a partial record of proceedings that does not contain all the documents listed in subdivision (e) if approved by the court.
(2)The plaintiff or petitioner may elect to prepare the record of proceedings by providing a notice of the election to the public agency, or the parties may agree to an alternative method of preparation of the record of proceedings, subject to certification of its accuracy by the public agency, within the 60-day time limit specified in this subdivision.
(3)Notwithstanding paragraph (2), the public agency, within five business days of the receipt of the notice specified in paragraph (2), may deny the request of the plaintiff or petitioner to prepare the record of proceedings, in which case the public agency or the real party in interest shall bear the costs of preparation and certification of the record of proceedings, and those costs shall not be recoverable from the plaintiff or petitioner.
(c)The time limit established by subdivision (b) may be extended only upon the stipulation of all parties who have been properly served in the action or proceeding or upon order of the court. Extensions shall be liberally granted by the court when the size of the record of proceedings renders infeasible compliance with that time limit. There is no limit on the number of extensions that may be granted by the court, but no single extension shall exceed 60 days unless the court determines that a longer extension is in the public interest.
(d)If the public agency fails to prepare and certify the record of proceedings within the time limit established in paragraph (1) of subdivision (b), or any continuances of that time limit, the plaintiff or petitioner may move for sanctions, and the court may, upon that motion, grant appropriate sanctions.
(e)The record of proceedings shall include, but is not limited to, all of the following items:
(1)All project application materials.
(2)All staff reports and related documents prepared by the respondent public agency with respect to its compliance with the substantive and procedural requirements of this division and with respect to the action on the project.
(3)All staff reports and related documents prepared by the respondent public agency and written testimony or documents submitted by any person relevant to any findings or statement of overriding considerations adopted by the respondent agency pursuant to this division.
(4)Any transcript or minutes of the proceedings at which the decisionmaking body of the respondent public agency heard testimony on, or considered any environmental document on, the project, and any transcript or minutes of proceedings before any advisory body to the respondent public agency that were presented to the decisionmaking body before action on the environmental documents or on the project.
(5)All notices issued by the respondent public agency to comply with this division or with any other law governing the processing and approval of the project.
(6)All written comments received in response to, or in connection with, environmental documents prepared for the project, including responses to the notice of preparation.
(7)All written evidence or correspondence submitted to, or transferred from, the respondent public agency with respect to compliance with this division or with respect to the project.
(8)Any proposed decisions or findings submitted to the decisionmaking body of the respondent public agency by its staff, or the project proponent, project opponents, or other persons.
(9)The documentation of the final public agency decision, including the final environmental impact report, mitigated negative declaration, or negative declaration, and all documents, in addition to those referenced in paragraph (3), cited or relied on in the findings or in a statement of overriding considerations adopted pursuant to this division.
(10)(A)(i)Any other written materials relevant to the respondent public agencys compliance with this division or to its decision on the merits of the project, including the initial study, any drafts of any environmental document or portions of the initial study or drafts that have been released for public review, and copies of studies or other documents relied upon in any environmental document prepared for the project and either made available to the public during the public review period or included in the respondent public agencys files on the project, and all internal agency communications, including staff notes and memoranda related to the project or to compliance with this division, but not including communications that are of a logistical nature, such as meeting invitations and scheduling communications, except that any material that is subject to privileges contained in the Evidence Code, or exemptions contained in the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code), shall not be included in the record of proceedings under this paragraph, consistent with existing law.
(ii)This subparagraph applies to a project that includes a distribution center or oil and gas infrastructure.
(B)(i)Any other written materials relevant to the respondent public agencys compliance with this division or to its decision on the merits of the project, including the initial study, any drafts of any environmental document, or portions of the initial study or drafts, that have been released for public review, and copies of studies or other documents relied upon in any environmental document prepared for the project and either made available to the public during the public review period or included in the respondent public agencys files on the project, and all internal agency communications, including memoranda related to the project or to compliance with this division, but not including communications that are of a logistical nature, such as meeting invitations and scheduling communications, except that any material that is subject to privileges contained in the Evidence Code, or exemptions contained in the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code), shall not be included in the record of proceedings under this paragraph, consistent with existing law.
(ii)This subparagraph applies to any project that is not subject to subparagraph (A).
(iii)For purposes of this subparagraph, internal agency communications does not include electronic internal agency communications, including emails, that were not presented to the final decisionmaking body. The public agency may, but is not required to, include any documents in the record of proceedings that are not specifically set forth in this subparagraph.
(11)The full written record before any inferior administrative decisionmaking body whose decision was appealed to a superior administrative decisionmaking body before the filing of litigation.
(f)In preparing the record of proceedings, the party preparing the record of proceedings shall strive to do so at reasonable cost in light of the scope of the record of proceedings.
(g)The clerk of the superior court shall prepare and certify the clerks transcript on appeal not later than 60 days from the date that the notice designating the papers or records to be included in the clerks transcript was filed with the superior court, if the party or parties pay any costs or fees for the preparation of the clerks transcript imposed in conformance with any law or rules of court. Nothing in this subdivision precludes an election to proceed by appendix, as provided in Rule 8.124 of the California Rules of Court.
(h)Extensions of the period for the filing of any brief on appeal may be allowed only by stipulation of the parties or by order of the court for good cause shown. Extensions for the filing of a brief on appeal shall be limited to one 30-day extension for the preparation of an opening brief and one 30-day extension for the preparation of a responding brief, except that the court may grant a longer extension or additional extensions if it determines that there is a substantial likelihood of settlement that would avoid the necessity of completing the appeal.
(i)At the completion of the filing of briefs on appeal, the appellant shall notify the court of the completion of the filing of briefs, whereupon the clerk of the reviewing court shall set the appeal for hearing on the first available calendar date.
SEC. 14.Section 21168.9 of the Public Resources Code is amended to read:21168.9.(a)If a court finds, as a result of a trial, hearing, or remand from an appellate court, that any determination, finding, or decision of a public agency has been made without compliance with this division, the court shall enter an order that includes one or more of the following:
(1)A mandate that the determination, finding, or decision be voided by the public agency, in whole or in part.
(2)If the court finds that a specific project activity or activities will prejudice the consideration or implementation of particular mitigation measures or alternatives to the project, a mandate that the public agency and any real parties in interest suspend any or all specific project activity or activities, pursuant to the determination, finding, or decision, that could result in an adverse change or alteration to the physical environment, until the public agency has taken any actions that may be necessary to bring the determination, finding, or decision into compliance with this division.
(3)A mandate that the public agency take specific action as may be necessary to bring the determination, finding, or decision into compliance with this division.
(b)(1)Any order pursuant to subdivision (a) shall include only those mandates that are necessary to achieve compliance with this division and only those specific project activities in noncompliance with this division. The order shall be made by the issuance of a peremptory writ of mandate specifying what action by the public agency is necessary to comply with this division. However, the order shall be limited to that portion of a determination, finding, or decision or the specific project activity or activities found to be in noncompliance only if a court finds that (A) the portion or specific project activity or activities are severable, (B) severance will not prejudice complete and full compliance with this division, and (C) the court has not found the remainder of the project to be in noncompliance with this division. The trial court shall retain jurisdiction over the public agencys proceedings by way of a return to the peremptory writ until the court has determined that the public agency has complied with this division.
(2)If the determination of a public agency that a project that is eligible for a statutory exemption or categorical exemption is found to violate this division, the order pursuant to subdivision (a) shall be subject to the limitations set forth in subdivision (c) of Section 21080.1 or Section 21083.03, as applicable.
(c)Nothing in this section authorizes a court to direct any public agency to exercise its discretion in any particular way. Except as expressly provided in this section, nothing in this section is intended to limit the equitable powers of the court.
SEC. 15.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
Distribution center means a warehouse distribution center, as defined in Section 2100 of the Labor Code, that is 50,000 square feet or larger.
SEC. 2.Section 21064 of the Public Resources Code is amended to read:21064.Negative declaration means a written statement briefly describing the reasons the lead agency has determined, based upon substantial evidence in the record record, that the proposed project will not have a significant effect on the environment and does not require the preparation of an environmental impact report.
SEC. 3.Section 21064.1 is added to the Public Resources Code, to read:21064.1.May have a significant effect on the environment means that there is no substantial evidence in the record the public agency has determined, based upon substantial evidence in the record, that the proposed project will not is more likely than not to have a significant effect on the environment.
SEC. 4.Section 21064.5 of the Public Resources Code is amended to read:21064.5.Mitigated negative declaration means a negative declaration prepared for a project when the initial study has identified potentially significant effects on the environment, but (1) revisions in the project plans or proposals made by, or agreed to by, the applicant before the proposed negative declaration and initial study are released for public review would avoid the effects or mitigate the effects to a point where no significant effect on the environment would occur, as determined by the public lead agency based upon substantial evidence in the record, and (2) there is the lead agency has determined, based upon substantial evidence in light of the whole record before the public agency record, that the project, as revised, will not have a significant effect on the environment.
SEC. 5.Section 21064.8 is added to the Public Resources Code, to read:21064.8.Oil and gas infrastructure means a facility used for the production, processing, transmission, storage, or distribution of petroleum or natural gas.
SEC. 6.Section 21067.5 is added to the Public Resources Code, to read:21067.5.Natural and protected lands means sites located within any of the following locations:
(a)The state park system, as described in Article 1 (commencing with Section 5001) of Chapter 1 of Division 5.
(b)A wilderness area, as defined in Section 5093.32.
(c)A marine protected area, as defined in Section 2852 of the Fish and Game Code.
(d)The national park system, as defined in Section 100102 of Title 54 of the United States Code.
(e)A national recreation area.
(f)A national monument.
(g)The national wild and scenic rivers system, as defined in Section 1273 of Title 16 of the United States Code.
(h)Any ecological reserve or wildlife management area acquired and managed by the Department of Fish and Wildlife pursuant to Article 2 (commencing with Section 1525) or Article 4 (commencing with Section 1580) of Chapter 5 of Division 2 of the Fish and Game Code.
(i)A hazardous waste site that is listed pursuant to Section 65962.5 of the Government Code or a hazardous waste site designated by the Department of Toxic Substances Control pursuant to Section 25356 of the Health and Safety Code, unless either of the following apply:
(1)The site is an underground storage tank site that received a uniform closure letter issued pursuant to subdivision (g) of Section 25296.10 of the Health and Safety Code based on closure criteria established by the State Water Resources Control Board for the use proposed by the project. This paragraph does not alter or change the conditions to remove a site from the list of hazardous waste sites listed pursuant to Section 65962.5 of the Government Code.
(2)The State Department of Public Health, State Water Resources Control Board, Department of Toxic Substances Control, or a local agency making a determination pursuant to subdivision (c) of Section 25296.10 of the Health and Safety Code has otherwise determined that the site is suitable for the use proposed by the project.
(j)Within a regulatory floodway as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency, unless the development has received a no-rise certification in accordance with Section 60.3(d)(3) of Title 44 of the Code of Federal Regulations.
(k)Lands under conservation easement.
(l)On, or within a 100-foot radius of, a wetland, as defined in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(m)An environmentally sensitive area within the coastal zone, as defined in Section 30107.5.
(n)Lands protected as preserve areas or reserve lands pursuant to an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code) or habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.).
SEC. 6.SEC. 7.Section 21080 of the Public Resources Code is amended to read:21080.(a)Except as otherwise provided in this division, this division shall apply to discretionary projects proposed to be carried out or approved by public agencies, including, but not limited to, the enactment and amendment of zoning ordinances, the issuance of zoning variances, the issuance of conditional use permits, and the approval of tentative subdivision maps unless the project is exempt from this division.
(b)This division does not apply to any of the following activities:
(1)Ministerial projects proposed to be carried out or approved by public agencies.
(2)Emergency repairs to public service facilities necessary to maintain service.
(3)Projects undertaken, carried out, or approved by a public agency to maintain, repair, restore, demolish, or replace property or facilities damaged or destroyed as a result of a disaster in a disaster-stricken area in which a state of emergency has been proclaimed by the Governor pursuant to Chapter 7 (commencing with Section 8550) of Division 1 of Title 2 of the Government Code.
(4)Specific actions necessary to prevent or mitigate an emergency.
(5)Projects that a public agency rejects or disapproves.
(6)Actions undertaken by a public agency relating to any thermal powerplant site or facility, including the expenditure, obligation, or encumbrance of funds by a public agency for planning, engineering, or design purposes, or for the conditional sale or purchase of equipment, fuel, water (except groundwater), steam, or power for a thermal powerplant, if the powerplant site and related facility will be the subject of an environmental impact report, negative declaration, or other document, prepared pursuant to a regulatory program certified pursuant to Section 21080.5, which will be prepared by the State Energy Resources Conservation and Development Commission, by the Public Utilities Commission, or by the city or county in which the powerplant and related facility would be located if the environmental impact report, negative declaration, or document includes the environmental impact, if any, of the action described in this paragraph.
(7)Activities or approvals necessary to the bidding for, hosting or staging of, and funding or carrying out of, an Olympic Games under the authority of the International Olympic Committee, except for the construction of facilities necessary for the Olympic Games.
(8)The establishment, modification, structuring, restructuring, or approval of rates, tolls, fares, or other charges by public agencies that the public agency finds are for the purpose of: (A) meeting operating expenses, including employee wage rates and fringe benefits; (B) purchasing or leasing supplies, equipment, or materials; (C) meeting financial reserve needs and requirements; (D) obtaining funds for capital projects necessary to maintain service within existing service areas; or (E) obtaining funds necessary to maintain those intracity transfers as are authorized by city charter. The public agency shall incorporate written findings in the record of any proceeding in which an exemption under this paragraph is claimed setting forth with specificity the basis for the claim of exemption.
(9)All classes of projects designated pursuant to Section 21084.
(10)A project for the institution or increase of passenger or commuter services on rail or highway rights-of-way already in use, including modernization of existing stations and parking facilities. For purposes of this paragraph, highway has the same meaning as defined in Section 360 of the Vehicle Code.
(11)A project for the institution or increase of passenger or commuter service on high-occupancy vehicle lanes already in use, including the modernization of existing stations and parking facilities.
(12)Facility extensions not to exceed four miles in length that are required for the transfer of passengers from or to exclusive public mass transit guideway or busway public transit services.
(13)A project for the development of a regional transportation improvement program, the state transportation improvement program, or a congestion management program prepared pursuant to Section 65089 of the Government Code.
(14)A project or portion of a project located in another state that will be subject to environmental impact review pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. Sec. 4321 et seq.) or similar state laws of that state. Any emissions or discharges that would have a significant effect on the environment in this state are subject to this division.
(15)Projects undertaken by a local agency to implement a rule or regulation imposed by a state agency, board, or commission under a certified regulatory program pursuant to Section 21080.5. Any site-specific effect of the project that was not analyzed as a significant effect on the environment in the plan or other written documentation required by Section 21080.5 is subject to this division.
(16)Approval by the Department of Pesticide Regulation of a pesticide emergency exemption pursuant to Section 136p of Title 7 of the United States Code.
(c)(1)If a lead agency determines that a proposed project, not otherwise exempt from this division, would not have a significant effect on the environment, the lead agency shall adopt a negative declaration to that effect. The negative declaration shall be prepared for the proposed project in either of the following circumstances:
(1)There is(A)The lead agency determines, based upon substantial evidence, in light of the whole record before the lead agency, that the project will not have a significant effect on the environment.
(2)(B)An initial study identifies potentially significant effects on the environment, but: (A) (i) revisions in the project plans or proposals made by, or agreed to by, the applicant before the proposed negative declaration and initial study are released for public review would avoid the effects or mitigate the effects to a point where no significant effect on the environment would occur, as determined by the public agency based upon substantial evidence on the record; and (B) there is (ii) the lead agency has determined, based upon substantial evidence, in light of the whole record before the lead agency, that the project, as revised, will not have a significant effect on the environment.
(d)(2)If there is no the lead agency determines, based upon substantial evidence, in light of the whole record before the lead agency, that it is more likely than not that the project will not have a significant effect on the environment, an environmental impact report shall be prepared.
(d)(1)Notwithstanding subdivision (c), an environmental impact report shall be prepared for a proposed project that includes a distribution center or oil and gas infrastructure, or that is located on natural and protected lands as defined pursuant to Section 21067.5, if there is substantial evidence, in light of the whole record before the lead agency, that the project could have a significant effect on the environment.
(2)The review of a proposed project that includes a distribution center or oil and gas infrastructure or that is located on natural and protected lands as defined pursuant to Section 21067.5 shall continue to be subject to the fair argument standard as it applied to those projects before January 1, 2026.
(e)(1)For purposes of this section and this division, substantial evidence includes fact, a reasonable assumption predicated upon fact, or expert opinion supported by fact.
(2)Substantial evidence is not argument, speculation, unsubstantiated opinion or narrative, evidence that is clearly inaccurate or erroneous, or evidence of social or economic impacts that do not contribute to, or are not caused by, physical impacts on the environment.
(f)As a result of the public review process for a mitigated negative declaration, including administrative decisions and public hearings, the lead agency may conclude that certain mitigation measures identified pursuant to subparagraph (B) of paragraph (2) (1) of subdivision (c) are infeasible or otherwise undesirable. In those circumstances, the lead agency, before approving the project, may delete those mitigation measures and substitute for them other mitigation measures that the lead agency finds, after holding a public hearing on the matter, are equivalent or more effective in mitigating significant effects on the environment to a less than significant level and that do not cause any potentially significant effect on the environment. If those new mitigation measures are made conditions of project approval or are otherwise made part of the project approval, the deletion of the former measures and the substitution of the new mitigation measures shall not constitute an action or circumstance requiring recirculation of the mitigated negative declaration.
(g)This section does not preclude a project applicant or any other person from challenging, in an administrative or judicial proceeding, the legality of a condition of project approval imposed by the lead agency. If, however, any condition of project approval set aside by either an administrative body or court was necessary to avoid or lessen the likelihood of the occurrence of a significant effect on the environment, the lead agencys approval of the negative declaration and project shall be invalid and a new environmental review process shall be conducted before the project can be reapproved, unless the lead agency substitutes a new condition that the lead agency finds, after holding a public hearing on the matter, is equivalent to, or more effective in, lessening or avoiding significant effects on the environment and that does not cause any potentially significant effect on the environment.
SEC. 7.Section 21080.08 is added to the Public Resources Code, to read:21080.08.SEC. 8.Section 21080.085 is added to the Public Resources Code, to read:21080.085.(a)This division does not apply to a rezoning that is consistent with implements an approved housing element.
(b)(1)Subdivision (a) does not apply to a rezoning that would allow for the construction of a distribution center or for oil and gas infrastructure. either of the following:
(A)A rezoning that would allow for the construction of a distribution center or for oil and gas infrastructure.
(B)A rezoning that would allow for construction to occur within the boundaries of any natural and protected lands as defined pursuant to Section 21067.5.
(2)(A)Subdivision (a) applies to a rezoning that includes within its boundaries any natural and protected lands as defined pursuant to Section 21067.5, or any portion thereof, that excludes those natural and protected lands from the rezoning.
(B)The rezoning of any parcel or portions of a parcel that is excluded from a rezoning under this paragraph shall be a separate project that is subject to this division.
SEC. 8.SEC. 9.Section 21080.1 of the Public Resources Code is amended to read:21080.1.(a)The lead agency shall be responsible for determining whether an environmental impact report, a negative declaration, or a mitigated negative declaration shall be required for any project that is subject to this division. That determination shall be final and conclusive on all persons, including responsible agencies, unless challenged as provided in Section 21167.
(b)(1)If a proposed project would otherwise be exempt from this division pursuant to a statutory exemption or a categorical exemption adopted before January 1, 2026, but for a single condition, the application of this division to the approval of the proposed project shall be limited to effects upon the environment that are caused solely by that single condition.
(2)An initial study or environmental impact report prepared for a project subject to this subdivision is only required to examine those effects that the lead agency determines, based upon substantial evidence in the record, are caused solely by the single condition that makes the proposed project ineligible for the statutory exemption or categorical exemption.
(3)An environmental impact report for a project subject to this subdivision is not required to include any discussion of alternatives to the project, cumulative impacts of the project, or the growth-inducing impacts of the project.
(4)This subdivision does not apply to either any of the following projects:
(A)A proposed project that is not similar in kind to the projects listed in the statutory or categorical exemption.
(A)(B)A proposed project that is ineligible for the statutory exemption or categorical exemption due to two or more conditions.
(C)A proposed project that is not consistent with applicable zoning designation and regulations, except for a housing development project, as defined in Section 65589.5 of the Government Code, that is proposed on a site identified as suitable or available for very low, low-, or moderate-income households in the local jurisdictions most recent adopted housing element that has been certified by the Department of Housing and Community Development to be in compliance with state law.
(B)(D)A proposed project that includes a distribution center or oil and gas infrastructure.
(E)A proposed project located on natural and protected lands as defined pursuant to Section 21067.5.
(5)As used in this subdivision, condition means a physical feature of the project or an effect upon the environment caused by the project.
(c)(1)Notwithstanding any other provision of this division, an environmental impact report shall be prepared for a proposed project that includes a distribution center or oil and gas infrastructure if there is substantial evidence, in light of the whole record before the lead agency, that the project could have a significant effect on the environment.(2)It is the intent of the Legislature that the review of proposed projects that include a distribution center or oil and gas infrastructure shall continue to be subject to the fair argument standard as it applied to those projects before January 1, 2026.(d)(c)In the case of a project described in subdivision (c) of Section 21065, the lead agency shall, upon the request of a potential applicant, provide for consultation prior to before the filing of the application regarding the range of actions, potential alternatives, mitigation measures, and any potential and significant effects on the environment of the project.
SEC. 10.Section 21082.2 of the Public Resources Code is amended to read:21082.2.(a)The lead agency shall determine whether a project may is more likely than not to have a significant effect on the environment based on substantial evidence in light of the whole record.
(b)The existence of public controversy over the environmental effects of a project shall not require preparation of an environmental impact report if there is no substantial evidence in light of the whole record before the lead agency that the project may have a significant effect on the environment. an environmental impact report would not otherwise be required by this division.
(c)Argument, speculation, unsubstantiated opinion or narrative, evidence which that is clearly inaccurate or erroneous, or evidence of social or economic impacts which that do not contribute to, or are not caused by, physical impacts on the environment, is not substantial evidence. Substantial evidence shall include facts, reasonable assumptions predicated upon facts, and expert opinion supported by facts.
(d)If there is the lead agency determines, based upon substantial evidence, in light of the whole record before the lead agency, that it is more likely than not that a project may will have a significant effect on the environment, an environmental impact report shall be prepared.
(e)Statements in an environmental impact report and comments with respect to an environmental impact report shall not be deemed determinative of whether the project may have a significant effect on the environment.
SEC. 9.SEC. 11.Section 21083 of the Public Resources Code is amended to read:21083.(a)The Office of Land Use and Climate Innovation shall prepare and develop proposed guidelines for the implementation of this division by public agencies. The guidelines shall include objectives and criteria for the orderly evaluation of projects and the preparation of environmental impact reports and negative declarations in a manner consistent with this division.
(b)The guidelines shall specifically include criteria for public agencies to follow in determining whether or not a proposed project may have a significant effect on the environment. The criteria shall require a finding that a project may have a significant effect on the environment if the lead agency determines, based upon substantial evidence in the record, that one or more of the following conditions exists:
(1)A proposed project has the potential to degrade the quality of the environment, curtail the range of the environment, or to achieve short-term, to the disadvantage of long-term, environmental goals.
(2)The possible effects of a project are individually limited but cumulatively considerable. As used in this paragraph, cumulatively considerable means that the incremental effects of an individual project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects.
(3)The environmental effects of a project will cause substantial adverse effects on human beings, either directly or indirectly.
(c)The guidelines shall include procedures for determining the lead agency pursuant to Section 21165.
(d)The guidelines shall include criteria for public agencies to use in determining when a proposed project is of sufficient statewide, regional, or areawide environmental significance that a draft environmental impact report, a proposed negative declaration, or a proposed mitigated negative declaration shall be submitted to appropriate state agencies, through the State Clearinghouse, for review and comment prior to completion of the environmental impact report, negative declaration, or mitigated negative declaration.
(e)The Office of Land Use and Climate Innovation shall develop and prepare the proposed guidelines as soon as possible and shall transmit them immediately to the Secretary of the Natural Resources Agency. The Secretary of the Natural Resources Agency shall certify and adopt the guidelines pursuant to Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, which shall become effective upon the filing thereof. However, the guidelines shall not be adopted without compliance with Sections 11346.4, 11346.5, and 11346.8 of the Government Code.
(f)The Office of Land Use and Climate Innovation shall, at least once every two years, review the guidelines adopted pursuant to this section and shall recommend proposed changes or amendments to the Secretary of the Natural Resources Agency. The Secretary of the Natural Resources Agency shall certify and adopt guidelines, and any amendments thereto, at least once every two years, pursuant to Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, which shall become effective upon the filing thereof. However, guidelines may not be adopted or amended without compliance with Sections 11346.4, 11346.5, and 11346.8 of the Government Code.
SEC. 10.SEC. 12.Section 21083.03 is added to the Public Resources Code, to read:21083.03.(a)On or before July 1, 2026, the Office of Land Use and Climate Innovation shall prepare, develop, and transmit to the Natural Resources Agency for certification and adoption an amendment to the Class 32 categorical exemption set forth in Section 15332 of Title 14 of the California Code of Regulations that establishes an alternative means of compliance with the requirements of that categorical exemption as follows:
(1)A housing development project, as defined in Section 65589.5 of the Government Code, that is not consistent with the applicable general plan designation, applicable general plan policies, or applicable zoning designation and regulations shall be in compliance with subdivision (a) of Section 15332 of Title 14 of the California Code of Regulations if the project is proposed on a site identified as suitable or available for very low, low-, or moderate-income households in the local jurisdictions most recent adopted housing element that has been certified by the Department of Housing and Community Development to be in compliance with state law.
(2)A project that does not occur within city limits on a project site of no more than five acres substantially surrounded by urban uses shall be in compliance with subdivision (b) of Section 15332 of Title 14 of the California Code of Regulations if the project occurs in either of the following locations:
(A)Within an urbanized area or urban cluster on a project site of no more than five acres substantially surrounded by urban uses.
(B)Within an area that the Office of Land Use and Climate Innovation has determined to be an eligible urban infill site pursuant to subdivision (c).
(3)(A)The amendment shall establish objective and measurable safe harbor thresholds that a lead agency may elect to use when making the determinations required under subdivisions (c), (d), and (e) of Section 15332 of Title 14 of the California Code of Regulations.
(B)A lead agency shall not be in violation of this division if the determinations required under subdivisions (c), (d), and (e) of Section 15332 of Title 14 of the California Code of Regulations were made in substantial compliance with thresholds adopted pursuant to this subdivision.
(C)The safe harbor thresholds adopted pursuant to this paragraph shall not be applicable to the review and consideration of a proposed project, and shall not be considered in an action or proceeding to attack, review, set aside, void, or annul a determination or decision related to a proposed project on the grounds of noncompliance with this division, unless the lead agency has expressly elected to use the safe harbor threshold for that project.
(4)The alternative means of compliance set forth in this subdivision shall not apply to a proposed project that includes a distribution center or oil and gas infrastructure.
(b)An amendment to Section 15332 of Title 14 of the California Code of Regulations adopted pursuant to this section shall not revise the requirements for exemption set forth in that section, except as provided in subdivision (a). A project that would be eligible for the Class 32 categorical exemption set forth in Section 15332 of Title 14 of the California Code of Regulations as it read on December 31, 2024, shall not be ineligible as the result of any amendment adopted pursuant to this section.
(c)On or before July 1, 2026, the Office of Land Use and Climate Innovation shall map the eligible urban infill sites within every urbanized area or urban cluster in the state where, notwithstanding that an area may or may not be substantially surrounded by urban uses, the local jurisdictions most recent general plan or most recently adopted housing element that has been certified by the Department of Housing and Community Development to be in compliance with state law has a zoning designation that is consistent with infill development.
(d)Subdivision (c) of Section 15300.2 of Title 14 of the California Code of Regulations does not apply to Section 15332 of Title 14 of the California Code of Regulations.
(e)(1)If a proposed project that is in compliance with subdivisions (a) and (b) of Section 15332 of Title 14 of the California Code of Regulations is otherwise ineligible for that categorical exemption due to one or more conditions, the application of this division to the approval of the proposed project shall be limited to the effects upon the environment that are caused solely by those conditions that make the project ineligible for the categorical exemption.
(2)For purposes of this subdivision, condition has the same meaning as in subdivision (b) of Section 21080.1.
(f)For purposes of this section, the following definitions apply:
(1)Urbanized area means an urbanized area designated by the United States Census Bureau, as published in the Federal Register, Volume 77, Number 59, on March 27, 2012.
(2)Urban cluster means an urban cluster designated by the United States Census Bureau, as published in the Federal Register, Volume 77, Number 59, on March 27, 2012.
(g)This section does not apply to a project that includes a distribution center or oil and gas infrastructure.
SEC. 11.SEC. 13.Section 21167.6 of the Public Resources Code is amended to read:21167.6.Notwithstanding any other law, in all actions or proceedings brought pursuant to Section 21167, except as provided in Section 21167.6.2 or those involving the Public Utilities Commission, all of the following shall apply:
(a)At the time that the action or proceeding is filed, the plaintiff or petitioner shall file a request that the respondent public agency prepare the record of proceedings relating to the subject of the action or proceeding. The request, together with the complaint or petition, shall be served personally upon the public agency not later than 10 business days from the date that the action or proceeding was filed.
(b)(1)(A)The public agency shall prepare and certify the record of proceedings not later than 60 days from the date that the request specified in subdivision (a) was served upon the public agency. Upon certification, the public agency shall lodge an electronic copy of the record of proceedings with the court and shall serve on the parties notice that the record of proceedings has been certified and lodged with the court. The parties shall pay any reasonable costs or fees imposed for the preparation of the record of proceedings in conformance with any law or rule of court.
(B)The court shall schedule a case management conference within 30 days of the filing of the complaint or petition pursuant to this division to review the scope, timing, and cost of the record of proceedings. The parties may stipulate to a partial record of proceedings that does not contain all the documents listed in subdivision (e) if approved by the court.
(2)The plaintiff or petitioner may elect to prepare the record of proceedings by providing a notice of the election to the public agency, or the parties may agree to an alternative method of preparation of the record of proceedings, subject to certification of its accuracy by the public agency, within the 60-day time limit specified in this subdivision.
(3)Notwithstanding paragraph (2), the public agency, within five business days of the receipt of the notice specified in paragraph (2), may deny the request of the plaintiff or petitioner to prepare the record of proceedings, in which case the public agency or the real party in interest shall bear the costs of preparation and certification of the record of proceedings, and those costs shall not be recoverable from the plaintiff or petitioner.
(c)The time limit established by subdivision (b) may be extended only upon the stipulation of all parties who have been properly served in the action or proceeding or upon order of the court. Extensions shall be liberally granted by the court when the size of the record of proceedings renders infeasible compliance with that time limit. There is no limit on the number of extensions that may be granted by the court, but no single extension shall exceed 60 days unless the court determines that a longer extension is in the public interest.
(d)If the public agency fails to prepare and certify the record of proceedings within the time limit established in paragraph (1) of subdivision (b), or any continuances of that time limit, the plaintiff or petitioner may move for sanctions, and the court may, upon that motion, grant appropriate sanctions.
(e)The record of proceedings shall include, but is not limited to, all of the following items:
(1)All project application materials.
(2)All staff reports and related documents prepared by the respondent public agency with respect to its compliance with the substantive and procedural requirements of this division and with respect to the action on the project.
(3)All staff reports and related documents prepared by the respondent public agency and written testimony or documents submitted by any person relevant to any findings or statement of overriding considerations adopted by the respondent agency pursuant to this division.
(4)Any transcript or minutes of the proceedings at which the decisionmaking body of the respondent public agency heard testimony on, or considered any environmental document on, the project, and any transcript or minutes of proceedings before any advisory body to the respondent public agency that were presented to the decisionmaking body before action on the environmental documents or on the project.
(5)All notices issued by the respondent public agency to comply with this division or with any other law governing the processing and approval of the project.
(6)All written comments received in response to, or in connection with, environmental documents prepared for the project, including responses to the notice of preparation.
(7)All written evidence or correspondence submitted to, or transferred from, the respondent public agency with respect to compliance with this division or with respect to the project.
(8)Any proposed decisions or findings submitted to the decisionmaking body of the respondent public agency by its staff, or the project proponent, project opponents, or other persons.
(9)The documentation of the final public agency decision, including the final environmental impact report, mitigated negative declaration, or negative declaration, and all documents, in addition to those referenced in paragraph (3), cited or relied on in the findings or in a statement of overriding considerations adopted pursuant to this division.
(10)(A)(i)Any other written materials relevant to the respondent public agencys compliance with this division or to its decision on the merits of the project, including the initial study, any drafts of any environmental document or portions of the initial study or drafts that have been released for public review, and copies of studies or other documents relied upon in any environmental document prepared for the project and either made available to the public during the public review period or included in the respondent public agencys files on the project, and all internal agency communications, including staff notes and memoranda related to the project or to compliance with this division, but not including communications that are of a logistical nature, such as meeting invitations and scheduling communications, except that any material that is subject to privileges contained in the Evidence Code, or exemptions contained in the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code), shall not be included in the record of proceedings under this paragraph, consistent with existing law.
(ii)This subparagraph applies to a project that includes a distribution center or oil and gas infrastructure.
(B)(i)Any other written materials relevant to the respondent public agencys compliance with this division or to its decision on the merits of the project, including the initial study, any drafts of any environmental document, or portions of the initial study or drafts, that have been released for public review, and copies of studies or other documents relied upon in any environmental document prepared for the project and either made available to the public during the public review period or included in the respondent public agencys files on the project, and all internal agency communications, including memoranda related to the project or to compliance with this division, but not including communications that are of a logistical nature, such as meeting invitations and scheduling communications, except that any material that is subject to privileges contained in the Evidence Code, or exemptions contained in the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code), shall not be included in the record of proceedings under this paragraph, consistent with existing law.
(ii)This subparagraph applies to any project that is not subject to subparagraph (A).
(iii)For purposes of this subparagraph, internal agency communications does not include electronic internal agency communications, including emails, that were not presented to the final decisionmaking body. The public agency may, but is not required to, include any documents in the record of proceedings that are not specifically set forth in this subparagraph.
(11)The full written record before any inferior administrative decisionmaking body whose decision was appealed to a superior administrative decisionmaking body before the filing of litigation.
(f)In preparing the record of proceedings, the party preparing the record of proceedings shall strive to do so at reasonable cost in light of the scope of the record of proceedings.
(g)The clerk of the superior court shall prepare and certify the clerks transcript on appeal not later than 60 days from the date that the notice designating the papers or records to be included in the clerks transcript was filed with the superior court, if the party or parties pay any costs or fees for the preparation of the clerks transcript imposed in conformance with any law or rules of court. Nothing in this subdivision precludes an election to proceed by appendix, as provided in Rule 8.124 of the California Rules of Court.
(h)Extensions of the period for the filing of any brief on appeal may be allowed only by stipulation of the parties or by order of the court for good cause shown. Extensions for the filing of a brief on appeal shall be limited to one 30-day extension for the preparation of an opening brief and one 30-day extension for the preparation of a responding brief, except that the court may grant a longer extension or additional extensions if it determines that there is a substantial likelihood of settlement that would avoid the necessity of completing the appeal.
(i)At the completion of the filing of briefs on appeal, the appellant shall notify the court of the completion of the filing of briefs, whereupon the clerk of the reviewing court shall set the appeal for hearing on the first available calendar date.
SEC. 12.SEC. 14.Section 21168.9 of the Public Resources Code is amended to read:21168.9.(a)If a court finds, as a result of a trial, hearing, or remand from an appellate court, that any determination, finding, or decision of a public agency has been made without compliance with this division, the court shall enter an order that includes one or more of the following:
(1)A mandate that the determination, finding, or decision be voided by the public agency, in whole or in part.
(2)If the court finds that a specific project activity or activities will prejudice the consideration or implementation of particular mitigation measures or alternatives to the project, a mandate that the public agency and any real parties in interest suspend any or all specific project activity or activities, pursuant to the determination, finding, or decision, that could result in an adverse change or alteration to the physical environment, until the public agency has taken any actions that may be necessary to bring the determination, finding, or decision into compliance with this division.
(3)A mandate that the public agency take specific action as may be necessary to bring the determination, finding, or decision into compliance with this division.
(b)(1)Any order pursuant to subdivision (a) shall include only those mandates which that are necessary to achieve compliance with this division and only those specific project activities in noncompliance with this division. The order shall be made by the issuance of a peremptory writ of mandate specifying what action by the public agency is necessary to comply with this division. However, the order shall be limited to that portion of a determination, finding, or decision or the specific project activity or activities found to be in noncompliance only if a court finds that (A) the portion or specific project activity or activities are severable, (B) severance will not prejudice complete and full compliance with this division, and (C) the court has not found the remainder of the project to be in noncompliance with this division. The trial court shall retain jurisdiction over the public agencys proceedings by way of a return to the peremptory writ until the court has determined that the public agency has complied with this division.
(2)If the determination of a public agency that a project that is eligible for a statutory exemption or categorical exemption is found to violate this division, the order pursuant to subdivision (a) shall be subject to the limitations set forth in subdivision (c) of Section 21080.1 or Section 21083.03, as applicable.
(c)Nothing in this section authorizes a court to direct any public agency to exercise its discretion in any particular way. Except as expressly provided in this section, nothing in this section is intended to limit the equitable powers of the court.
SEC. 13.SEC. 15.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
Distribution center means a warehouse distribution center, as defined in Section 2100 of the Labor Code, that is 50,000 square feet or larger.
SEC. 2.Section 21064 of the Public Resources Code is amended to read:21064.Negative declaration means a written statement briefly describing the reasons that a substantial evidence in the record that the proposed project will not have a significant effect on the environment and does not require the preparation of an environmental impact report.
SEC. 3.Section 21064.1 is added to the Public Resources Code, to read:21064.1.May have a significant effect on the environment means that there is no substantial evidence in the record that the proposed project will not have a significant effect on the environment.
SEC. 4.Section 21064.5 of the Public Resources Code is amended to read:21064.5.Mitigated negative declaration means a negative declaration prepared for a project when the initial study has identified potentially significant effects on the environment, but (1) revisions in the project plans or proposals made by, or agreed to by, the applicant before the proposed negative declaration and initial study are released for public review would avoid the effects or mitigate the effects to a point where clearly no significant effect on the environment would occur, as determined by the public agency based upon substantial evidence in the record, and (2) there is no substantial evidence in light of the whole record before the public agency that the project, as revised, may will not have a significant effect on the environment.
SEC. 5.Section 21064.8 is added to the Public Resources Code, to read:21064.8.Oil and gas infrastructure means a facility used for the production, processing, transmission, storage, or distribution of petroleum or natural gas.
SEC. 6.Section 21080 of the Public Resources Code is amended to read:21080.(a)Except as otherwise provided in this division, this division shall apply to discretionary projects proposed to be carried out or approved by public agencies, including, but not limited to, the enactment and amendment of zoning ordinances, the issuance of zoning variances, the issuance of conditional use permits, and the approval of tentative subdivision maps unless the project is exempt from this division.
(b)This division does not apply to any of the following activities:
(1)Ministerial projects proposed to be carried out or approved by public agencies.
(2)Emergency repairs to public service facilities necessary to maintain service.
(3)Projects undertaken, carried out, or approved by a public agency to maintain, repair, restore, demolish, or replace property or facilities damaged or destroyed as a result of a disaster in a disaster-stricken area in which a state of emergency has been proclaimed by the Governor pursuant to Chapter 7 (commencing with Section 8550) of Division 1 of Title 2 of the Government Code.
(4)Specific actions necessary to prevent or mitigate an emergency.
(5)Projects that a public agency rejects or disapproves.
(6)Actions undertaken by a public agency relating to any thermal powerplant site or facility, including the expenditure, obligation, or encumbrance of funds by a public agency for planning, engineering, or design purposes, or for the conditional sale or purchase of equipment, fuel, water (except groundwater), steam, or power for a thermal powerplant, if the powerplant site and related facility will be the subject of an environmental impact report, negative declaration, or other document, prepared pursuant to a regulatory program certified pursuant to Section 21080.5, which will be prepared by the State Energy Resources Conservation and Development Commission, by the Public Utilities Commission, or by the city or county in which the powerplant and related facility would be located if the environmental impact report, negative declaration, or document includes the environmental impact, if any, of the action described in this paragraph.
(7)Activities or approvals necessary to the bidding for, hosting or staging of, and funding or carrying out of, an Olympic Games under the authority of the International Olympic Committee, except for the construction of facilities necessary for the Olympic Games.
(8)The establishment, modification, structuring, restructuring, or approval of rates, tolls, fares, or other charges by public agencies that the public agency finds are for the purpose of: (A) meeting operating expenses, including employee wage rates and fringe benefits; (B) purchasing or leasing supplies, equipment, or materials; (C) meeting financial reserve needs and requirements; (D) obtaining funds for capital projects necessary to maintain service within existing service areas; or (E) obtaining funds necessary to maintain those intracity transfers as are authorized by city charter. The public agency shall incorporate written findings in the record of any proceeding in which an exemption under this paragraph is claimed setting forth with specificity the basis for the claim of exemption.
(9)All classes of projects designated pursuant to Section 21084.
(10)A project for the institution or increase of passenger or commuter services on rail or highway rights-of-way already in use, including modernization of existing stations and parking facilities. For purposes of this paragraph, highway has the same meaning as defined in Section 360 of the Vehicle Code.
(11)A project for the institution or increase of passenger or commuter service on high-occupancy vehicle lanes already in use, including the modernization of existing stations and parking facilities.
(12)Facility extensions not to exceed four miles in length that are required for the transfer of passengers from or to exclusive public mass transit guideway or busway public transit services.
(13)A project for the development of a regional transportation improvement program, the state transportation improvement program, or a congestion management program prepared pursuant to Section 65089 of the Government Code.
(14)A project or portion of a project located in another state that will be subject to environmental impact review pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. Sec. 4321 et seq.) or similar state laws of that state. Any emissions or discharges that would have a significant effect on the environment in this state are subject to this division.
(15)Projects undertaken by a local agency to implement a rule or regulation imposed by a state agency, board, or commission under a certified regulatory program pursuant to Section 21080.5. Any site-specific effect of the project that was not analyzed as a significant effect on the environment in the plan or other written documentation required by Section 21080.5 is subject to this division.
(16)Approval by the Department of Pesticide Regulation of a pesticide emergency exemption pursuant to Section 136p of Title 7 of the United States Code.
(c)If a lead agency determines that a proposed project, not otherwise exempt from this division, would not have a significant effect on the environment, the lead agency shall adopt a negative declaration to that effect. The negative declaration shall be prepared for the proposed project in either of the following circumstances:
(1)There is no substantial evidence, in light of the whole record before the lead agency, that the project may will not have a significant effect on the environment.
(2)An initial study identifies potentially significant effects on the environment, but: (A) revisions in the project plans or proposals made by, or agreed to by, the applicant before the proposed negative declaration and initial study are released for public review would avoid the effects or mitigate the effects to a point where clearly no significant effect on the environment would occur; occur, as determined by the public agency based upon substantial evidence on the record; and (B) there is no substantial evidence, in light of the whole record before the lead agency, that the project, as revised, may will not have a significant effect on the environment.
(d)If there is no substantial evidence, in light of the whole record before the lead agency, that the project may will not have a significant effect on the environment, an environmental impact report shall be prepared.
(e)(1)For purposes of this section and this division, substantial evidence includes fact, a reasonable assumption predicated upon fact, or expert opinion supported by fact.
(2)Substantial evidence is not argument, speculation, unsubstantiated opinion or narrative, evidence that is clearly inaccurate or erroneous, or evidence of social or economic impacts that do not contribute to, or are not caused by, physical impacts on the environment.
(f)As a result of the public review process for a mitigated negative declaration, including administrative decisions and public hearings, the lead agency may conclude that certain mitigation measures identified pursuant to paragraph (2) of subdivision (c) are infeasible or otherwise undesirable. In those circumstances, the lead agency, before approving the project, may delete those mitigation measures and substitute for them other mitigation measures that the lead agency finds, after holding a public hearing on the matter, are equivalent or more effective in mitigating significant effects on the environment to a less than significant level and that do not cause any potentially significant effect on the environment. If those new mitigation measures are made conditions of project approval or are otherwise made part of the project approval, the deletion of the former measures and the substitution of the new mitigation measures shall not constitute an action or circumstance requiring recirculation of the mitigated negative declaration.
(g)This section does not preclude a project applicant or any other person from challenging, in an administrative or judicial proceeding, the legality of a condition of project approval imposed by the lead agency. If, however, any condition of project approval set aside by either an administrative body or court was necessary to avoid or lessen the likelihood of the occurrence of a significant effect on the environment, the lead agencys approval of the negative declaration and project shall be invalid and a new environmental review process shall be conducted before the project can be reapproved, unless the lead agency substitutes a new condition that the lead agency finds, after holding a public hearing on the matter, is equivalent to, or more effective in, lessening or avoiding significant effects on the environment and that does not cause any potentially significant effect on the environment.
SECTION 1.SEC. 7.Section 21080.08 is added to the Public Resources Code, to read:21080.08.(a)This division does not apply to a rezoning that is consistent with an approved housing element.
(b)Subdivision (a) does not apply to a rezoning that would allow for the construction of a distribution center or for oil and gas infrastructure.
SEC. 2.SEC. 8.Section 21080.1 of the Public Resources Code is amended to read:21080.1.(a)(1)The lead agency shall be responsible for determining whether an environmental impact report, a negative declaration, or a mitigated negative declaration shall be required for any project that is subject to this division. That determination shall be final and conclusive on all persons, including responsible agencies, unless challenged as provided in Section 21167.
(2)(A)The lead agency shall limit the scope of an environmental impact report to the condition of a categorical exemption that the lead agency determines, after a preliminary review of the project, disqualifies the project from eligibility under the categorical exemption, if the lead agency determines that the project meets all other conditions of the categorical exemption except for the one condition that disqualifies it.(B)This paragraph does not apply to a project that is disqualified from a categorical exemption for failing to meet two or more conditions of the categorical exemption.(C)This paragraph does not apply to a project to construct or that is related to a distribution center or oil and gas infrastructure.(3)(A)The lead agencys determination to adopt a negative declaration or mitigated negative declaration shall be upheld if there is a fair argument that substantial evidence supports the determination.(B)This paragraph does not apply to a project to construct or that is related to a distribution center or oil and gas infrastructure.(b)(1)If a proposed project would otherwise be exempt from this division pursuant to a statutory exemption or a categorical exemption but for a single condition, the application of this division to the approval of the proposed project shall be limited to effects upon the environment that are caused solely by that single condition.
(2)An initial study or environmental impact report prepared for a project subject to this subdivision is only required to examine those effects that the lead agency determines, based upon substantial evidence in the record, are caused solely by the single condition that makes the proposed project ineligible for the statutory exemption or categorical exemption.
(3)An environmental impact report for a project subject to this subdivision is not required to include any discussion of alternatives to the project, cumulative impacts of the project, or the growth-inducing impacts of the project.
(4)This subdivision does not apply to either of the following projects:
(A)A proposed project that is ineligible for the statutory exemption or categorical exemption due to two or more conditions.
(B)A proposed project that includes a distribution center or oil and gas infrastructure.
(5)As used in this subdivision, condition means a physical feature of the project or an effect upon the environment caused by the project.
(c)(1)Notwithstanding any other provision of this division, an environmental impact report shall be prepared for a proposed project that includes a distribution center or oil and gas infrastructure if there is substantial evidence, in light of the whole record before the lead agency, that the project could have a significant effect on the environment.
(2)It is the intent of the Legislature that the review of proposed projects that include a distribution center or oil and gas infrastructure shall continue to be subject to the fair argument standard as it applied to those projects before January 1, 2026.
(b)(d)In the case of a project described in subdivision (c) of Section 21065, the lead agency shall, upon the request of a potential applicant, provide for consultation prior to the filing of the application regarding the range of actions, potential alternatives, mitigation measures, and any potential and significant effects on the environment of the project.
SEC. 9.Section 21083 of the Public Resources Code is amended to read:21083.(a)The Office of Planning and Research Land Use and Climate Innovation shall prepare and develop proposed guidelines for the implementation of this division by public agencies. The guidelines shall include objectives and criteria for the orderly evaluation of projects and the preparation of environmental impact reports and negative declarations in a manner consistent with this division.
(b)The guidelines shall specifically include criteria for public agencies to follow in determining whether or not a proposed project may have a significant effect on the environment. The criteria shall require a finding that a project may have a significant effect on the environment if the lead agency determines, based upon substantial evidence in the record, that one or more of the following conditions exist: exists:
(1)A proposed project has the potential to degrade the quality of the environment, curtail the range of the environment, or to achieve short-term, to the disadvantage of long-term, environmental goals.
(2)The possible effects of a project are individually limited but cumulatively considerable. As used in this paragraph, cumulatively considerable means that the incremental effects of an individual project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects.
(3)The environmental effects of a project will cause substantial adverse effects on human beings, either directly or indirectly.
(c)The guidelines shall include procedures for determining the lead agency pursuant to Section 21165.
(d)The guidelines shall include criteria for public agencies to use in determining when a proposed project is of sufficient statewide, regional, or areawide environmental significance that a draft environmental impact report, a proposed negative declaration, or a proposed mitigated negative declaration shall be submitted to appropriate state agencies, through the State Clearinghouse, for review and comment prior to completion of the environmental impact report, negative declaration, or mitigated negative declaration.
(e)The Office of Planning and Research Land Use and Climate Innovation shall develop and prepare the proposed guidelines as soon as possible and shall transmit them immediately to the Secretary of the Natural Resources Agency. The Secretary of the Natural Resources Agency shall certify and adopt the guidelines pursuant to Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, which shall become effective upon the filing thereof. However, the guidelines shall not be adopted without compliance with Sections 11346.4, 11346.5, and 11346.8 of the Government Code.
(f)The Office of Planning and Research Land Use and Climate Innovation shall, at least once every two years, review the guidelines adopted pursuant to this section and shall recommend proposed changes or amendments to the Secretary of the Natural Resources Agency. The Secretary of the Natural Resources Agency shall certify and adopt guidelines, and any amendments thereto, at least once every two years, pursuant to Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, which shall become effective upon the filing thereof. However, guidelines may not be adopted or amended without compliance with Sections 11346.4, 11346.5, and 11346.8 of the Government Code.
SEC. 3.SEC. 10.Section 21083.03 is added to the Public Resources Code, to read:21083.03.(a)On or before July 1, 2026, the Office of Land Use and Climate Innovation shall prepare, develop, and transmit to the Natural Resources Agency for certification and adoption refinements to the infill development project categorical exemption pursuant to an amendment to the Class 32 categorical exemption set forth in Section 15332 of Title 14 of the California Code of Regulations that establish all of the following: establishes an alternative means of compliance with the requirements of that categorical exemption as follows:
(1)For purposes of compliance with subdivision (a) of Section 15332 of Title 14 of the California Code of Regulations, a project is also eligible if it is consistent with the zoning designated by the local jurisdictions most recently adopted housing element, provided that the housing element has been certified by the Department of Housing and Community Development to be in compliance with state law.(2)Notwithstanding that a project may or may not be substantially surrounded by urban uses pursuant to subdivision (b) of Section 15332 of Title 14 of the California Code of Regulations, that a project is in compliance with subdivision (b) of Section 15332 of Title 14 of the California Code of Regulations if it is located within an area that the Office of Land Use and Climate Innovation has determined to be an eligible urban infill site pursuant to subdivision (b).(3)Objective and measurable thresholds for an effect upon the environment to be considered significant for purposes of subdivision (d) of Section 15332 of Title 14 of the California Code of Regulations.(1)A housing development project, as defined in Section 65589.5 of the Government Code, that is not consistent with the applicable general plan designation, applicable general plan policies, or applicable zoning designation and regulations shall be in compliance with subdivision (a) of Section 15332 of Title 14 of the California Code of Regulations if the project is proposed on a site identified as suitable or available for very low, low-, or moderate-income households in the local jurisdictions most recent adopted housing element that has been certified by the Department of Housing and Community Development to be in compliance with state law.
(2)A project that does not occur within city limits on a project site of no more than five acres substantially surrounded by urban uses shall be in compliance with subdivision (b) of Section 15332 of Title 14 of the California Code of Regulations if the project occurs in either of the following locations:
(A)Within an urbanized area or urban cluster on a project site of no more than five acres substantially surrounded by urban uses.
(B)Within an area that the Office of Land Use and Climate Innovation has determined to be an eligible urban infill site pursuant to subdivision (c).
(3)(A)The amendment shall establish objective and measurable safe harbor thresholds that a lead agency may elect to use when making the determinations required under subdivisions (c), (d), and (e) of Section 15332 of Title 14 of the California Code of Regulations.
(B)A lead agency shall not be in violation of this division if the determinations required under subdivisions (c), (d), and (e) of Section 15332 of Title 14 of the California Code of Regulations were made in substantial compliance with thresholds adopted pursuant to this subdivision.
(C)The safe harbor thresholds adopted pursuant to this paragraph shall not be applicable to the review and consideration of a proposed project, and shall not be considered in an action or proceeding to attack, review, set aside, void, or annul a determination or decision related to a proposed project on the grounds of noncompliance with this division, unless the lead agency has expressly elected to use the safe harbor threshold for that project.
(4)The alternative means of compliance set forth in this subdivision shall not apply to a proposed project that includes a distribution center or oil and gas infrastructure.
(b)An amendment to Section 15332 of Title 14 of the California Code of Regulations adopted pursuant to this section shall not revise the requirements for exemption set forth in that section, except as provided in subdivision (a). A project that would be eligible for the Class 32 categorical exemption set forth in Section 15332 of Title 14 of the California Code of Regulations as it read on December 31, 2024, shall not be ineligible as the result of any amendment adopted pursuant to this section.
(b)(c)On or before July 1, 2026, the Office of Land Use and Climate Innovation shall map the eligible urban infill sites within every incorporated city urbanized area or urban cluster in the state where, notwithstanding that an area may or may not be substantially surrounded by urban uses, the local jurisdictions most recent general plan or most recently adopted housing element that has been certified by the Department of Housing and Community Development to be in compliance with state law has a zoning designation that is consistent with infill development.
(c)(d)Subdivision (c) of Section 15300.2 of Title 14 of the California Code of Regulations does not apply to Section 15332 of Title 14 of the California Code of Regulations.
(d)If an infill(e)(1)If a proposed project that is not eligible for the categorical exemption pursuant to in compliance with subdivisions (a) and (b) of Section 15332 of Title 14 of the California Code of Regulations, only the reasons for the ineligibility shall be subject to CEQA review. Regulations is otherwise ineligible for that categorical exemption due to one or more conditions, the application of this division to the approval of the proposed project shall be limited to the effects upon the environment that are caused solely by those conditions that make the project ineligible for the categorical exemption.
(2)For purposes of this subdivision, condition has the same meaning as in subdivision (b) of Section 21080.1.
(f)For purposes of this section, the following definitions apply:
(1)Urbanized area means an urbanized area designated by the United States Census Bureau, as published in the Federal Register, Volume 77, Number 59, on March 27, 2012.
(2)Urban cluster means an urban cluster designated by the United States Census Bureau, as published in the Federal Register, Volume 77, Number 59, on March 27, 2012.
(e)(g)This section and refinements developed by the Office of Land Use and Climate Innovation does not apply to a project to construct or that is related to that includes a distribution center or oil and gas infrastructure.
SEC. 4.Section 21165.5 is added to the Public Resources Code, to read:21165.5.(a)If an action or proceeding alleging that a lead agency improperly applied to a project a statutory exemption pursuant to this division, or a categorical exemption, is successful, the subsequent environmental review for the project shall be limited to the facts the action or proceeding relied upon that disqualified the project from the statutory or categorical exemption.(b)This section does not apply to a project to construct or that is related to a distribution center or oil and gas infrastructure.SEC. 5.SEC. 11.Section 21167.6 of the Public Resources Code is amended to read:21167.6.Notwithstanding any other law, in all actions or proceedings brought pursuant to Section 21167, except as provided in Section 21167.6.2 or those involving the Public Utilities Commission, all of the following shall apply:
(a)At the time that the action or proceeding is filed, the plaintiff or petitioner shall file a request that the respondent public agency prepare the record of proceedings relating to the subject of the action or proceeding. The request, together with the complaint or petition, shall be served personally upon the public agency not later than 10 business days from the date that the action or proceeding was filed.
(b)(1)(A)The public agency shall prepare and certify the record of proceedings not later than 60 days from the date that the request specified in subdivision (a) was served upon the public agency. Upon certification, the public agency shall lodge an electronic copy of the record of proceedings with the court and shall serve on the parties notice that the record of proceedings has been certified and lodged with the court. The parties shall pay any reasonable costs or fees imposed for the preparation of the record of proceedings in conformance with any law or rule of court.
(B)The court shall schedule a case management conference within 30 days of the filing of the complaint or petition pursuant to this division to review the scope, timing, and cost of the record of proceedings. The parties may stipulate to a partial record of proceedings that does not contain all the documents listed in subdivision (e) if approved by the court.
(2)The plaintiff or petitioner may elect to prepare the record of proceedings by providing a notice of the election to the public agency, or the parties may agree to an alternative method of preparation of the record of proceedings, subject to certification of its accuracy by the public agency, within the 60-day time limit specified in this subdivision.
(3)Notwithstanding paragraph (2), the public agency, within five business days of the receipt of the notice specified in paragraph (2), may deny the request of the plaintiff or petitioner to prepare the record of proceedings, in which case the public agency or the real party in interest shall bear the costs of preparation and certification of the record of proceedings, and those costs shall not be recoverable from the plaintiff or petitioner.
(c)The time limit established by subdivision (b) may be extended only upon the stipulation of all parties who have been properly served in the action or proceeding or upon order of the court. Extensions shall be liberally granted by the court when the size of the record of proceedings renders infeasible compliance with that time limit. There is no limit on the number of extensions that may be granted by the court, but no single extension shall exceed 60 days unless the court determines that a longer extension is in the public interest.
(d)If the public agency fails to prepare and certify the record of proceedings within the time limit established in paragraph (1) of subdivision (b), or any continuances of that time limit, the plaintiff or petitioner may move for sanctions, and the court may, upon that motion, grant appropriate sanctions.
(e)The record of proceedings shall include, but is not limited to, all of the following items:
(1)All project application materials.
(2)All staff reports and related documents prepared by the respondent public agency with respect to its compliance with the substantive and procedural requirements of this division and with respect to the action on the project.
(3)All staff reports and related documents prepared by the respondent public agency and written testimony or documents submitted by any person relevant to any findings or statement of overriding considerations adopted by the respondent agency pursuant to this division.
(4)Any transcript or minutes of the proceedings at which the decisionmaking body of the respondent public agency heard testimony on, or considered any environmental document on, the project, and any transcript or minutes of proceedings before any advisory body to the respondent public agency that were presented to the decisionmaking body before action on the environmental documents or on the project.
(5)All notices issued by the respondent public agency to comply with this division or with any other law governing the processing and approval of the project.
(6)All written comments received in response to, or in connection with, environmental documents prepared for the project, including responses to the notice of preparation.
(7)All written evidence or correspondence submitted to, or transferred from, the respondent public agency with respect to compliance with this division or with respect to the project.
(8)Any proposed decisions or findings submitted to the decisionmaking body of the respondent public agency by its staff, or the project proponent, project opponents, or other persons.
(9)The documentation of the final public agency decision, including the final environmental impact report, mitigated negative declaration, or negative declaration, and all documents, in addition to those referenced in paragraph (3), cited or relied on in the findings or in a statement of overriding considerations adopted pursuant to this division.
(10)(A)(i)Any other written materials relevant to the respondent public agencys compliance with this division or to its decision on the merits of the project, including the initial study, any drafts of any environmental document or portions of the initial study or drafts that have been released for public review, and copies of studies or other documents relied upon in any environmental document prepared for the project and either made available to the public during the public review period or included in the respondent public agencys files on the project, and all internal agency communications, including staff notes and memoranda related to the project or to compliance with this division, but not including communications that are of a logistical nature, such as meeting invitations and scheduling communications, except that any material that is subject to privileges contained in the Evidence Code, or exemptions contained in the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code), shall not be included in the record of proceedings under this paragraph, consistent with existing law.
(ii)This subparagraph applies to a project that includes a distribution center or oil and gas infrastructure.
(10)Any(B)(i)Any other written materials relevant to the respondent public agencys compliance with this division or to its decision on the merits of the project, including the initial study, any drafts of any environmental document, or portions thereof, of the initial study or drafts, that have been released for public review, and copies of studies or other documents relied upon in any environmental document prepared for the project and either made available to the public during the public review period or included in the respondent public agencys files on the project, and all internal agency communications, including staff notes and memoranda related to the project or to compliance with this division, but not including communications of persons tangential to or far removed from project decisionmaking, unless those communications are related to a project that would construct or is related to a distribution center or oil and gas infrastructure, or that are of a logistical nature, such as meeting invitations and scheduling communications, except that any material that is subject to privileges contained in the Evidence Code, or exemptions contained in the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code) Code), shall not be included in the record of proceedings under this paragraph, consistent with existing law.
(ii)This subparagraph applies to any project that is not subject to subparagraph (A).
(iii)For purposes of this subparagraph, internal agency communications does not include electronic internal agency communications, including emails, that were not presented to the final decisionmaking body. The public agency may, but is not required to, include any documents in the record of proceedings that are not specifically set forth in this subparagraph.
(11)The full written record before any inferior administrative decisionmaking body whose decision was appealed to a superior administrative decisionmaking body before the filing of litigation.
(f)In preparing the record of proceedings, the party preparing the record of proceedings shall strive to do so at reasonable cost in light of the scope of the record of proceedings.
(g)The clerk of the superior court shall prepare and certify the clerks transcript on appeal not later than 60 days from the date that the notice designating the papers or records to be included in the clerks transcript was filed with the superior court, if the party or parties pay any costs or fees for the preparation of the clerks transcript imposed in conformance with any law or rules of court. Nothing in this subdivision precludes an election to proceed by appendix, as provided in Rule 8.124 of the California Rules of Court.
(h)Extensions of the period for the filing of any brief on appeal may be allowed only by stipulation of the parties or by order of the court for good cause shown. Extensions for the filing of a brief on appeal shall be limited to one 30-day extension for the preparation of an opening brief and one 30-day extension for the preparation of a responding brief, except that the court may grant a longer extension or additional extensions if it determines that there is a substantial likelihood of settlement that would avoid the necessity of completing the appeal.
(i)At the completion of the filing of briefs on appeal, the appellant shall notify the court of the completion of the filing of briefs, whereupon the clerk of the reviewing court shall set the appeal for hearing on the first available calendar date.
SEC. 12.Section 21168.9 of the Public Resources Code is amended to read:21168.9.(a)If a court finds, as a result of a trial, hearing, or remand from an appellate court, that any determination, finding, or decision of a public agency has been made without compliance with this division, the court shall enter an order that includes one or more of the following:
(1)A mandate that the determination, finding, or decision be voided by the public agency, in whole or in part.
(2)If the court finds that a specific project activity or activities will prejudice the consideration or implementation of particular mitigation measures or alternatives to the project, a mandate that the public agency and any real parties in interest suspend any or all specific project activity or activities, pursuant to the determination, finding, or decision, that could result in an adverse change or alteration to the physical environment, until the public agency has taken any actions that may be necessary to bring the determination, finding, or decision into compliance with this division.
(3)A mandate that the public agency take specific action as may be necessary to bring the determination, finding, or decision into compliance with this division.
(b)(1)Any order pursuant to subdivision (a) shall include only those mandates which are necessary to achieve compliance with this division and only those specific project activities in noncompliance with this division. The order shall be made by the issuance of a peremptory writ of mandate specifying what action by the public agency is necessary to comply with this division. However, the order shall be limited to that portion of a determination, finding, or decision or the specific project activity or activities found to be in noncompliance only if a court finds that (1) (A) the portion or specific project activity or activities are severable, (2) (B) severance will not prejudice complete and full compliance with this division, and (3) (C) the court has not found the remainder of the project to be in noncompliance with this division. The trial court shall retain jurisdiction over the public agencys proceedings by way of a return to the peremptory writ until the court has determined that the public agency has complied with this division.
(2)If the determination of a public agency that a project that is eligible for a statutory exemption or categorical exemption is found to violate this division, the order pursuant to subdivision (a) shall be subject to the limitations set forth in subdivision (c) of Section 21080.1 or Section 21083.03, as applicable.
(c)Nothing in this section authorizes a court to direct any public agency to exercise its discretion in any particular way. Except as expressly provided in this section, nothing in this section is intended to limit the equitable powers of the court.
SEC. 6.SEC. 13.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)This division does not apply to a rezoning that is consistent with an approved housing element.
(b)Subdivision (a) does not apply to a rezoning that would allow for the construction of a distribution center or for oil and gas infrastructure.
SEC. 2.Section 21080.1 of the Public Resources Code is amended to read:21080.1.(a)(1)The lead agency shall be responsible for determining whether an environmental impact report, a negative declaration, or a mitigated negative declaration shall be required for any project which that is subject to this division. That determination shall be final and conclusive on all persons, including responsible agencies, unless challenged as provided in Section 21167.
(2)(A)The lead agency shall limit the scope of an environmental impact report to the condition of a categorical exemption that the lead agency determines, after a preliminary review of the project, disqualifies the project from eligibility under the categorical exemption, if the lead agency determines that the project meets all other conditions of the categorical exemption except for the one condition that disqualifies it.
(B)This paragraph does not apply to a project that is disqualified from a categorical exemption for failing to meet two or more conditions of the categorical exemption.
(C)This paragraph does not apply to a project to construct or that is related to a distribution center or oil and gas infrastructure.
(3)(A)The lead agencys determination to adopt a negative declaration or mitigated negative declaration shall be upheld if there is a fair argument that substantial evidence supports the determination.
(B)This paragraph does not apply to a project to construct or that is related to a distribution center or oil and gas infrastructure.
(b)In the case of a project described in subdivision (c) of Section 21065, the lead agency shall, upon the request of a potential applicant, provide for consultation prior to the filing of the application regarding the range of actions, potential alternatives, mitigation measures, and any potential and significant effects on the environment of the project.
SEC. 3.Section 21083.03 is added to the Public Resources Code, to read:21083.03.(a)On or before July 1, 2026, the Office of Land Use and Climate Innovation shall prepare, develop, and transmit to the Natural Resources Agency for certification and adoption refinements to the infill development project categorical exemption pursuant to Section 15332 of Title 14 of the California Code of Regulations that establish all of the following:
(1)For purposes of compliance with subdivision (a) of Section 15332 of Title 14 of the California Code of Regulations, a project is also eligible if it is consistent with the zoning designated by the local jurisdictions most recently adopted housing element, provided that the housing element has been certified by the Department of Housing and Community Development to be in compliance with state law.
(2)Notwithstanding that a project may or may not be substantially surrounded by urban uses pursuant to subdivision (b) of Section 15332 of Title 14 of the California Code of Regulations, that a project is in compliance with subdivision (b) of Section 15332 of Title 14 of the California Code of Regulations if it is located within an area that the Office of Land Use and Climate Innovation has determined to be an eligible urban infill site pursuant to subdivision (b).
(3)Objective and measurable thresholds for an effect upon the environment to be considered significant for purposes of subdivision (d) of Section 15332 of Title 14 of the California Code of Regulations.
(b)On or before July 1, 2026, the Office of Land Use and Climate Innovation shall map the eligible urban infill sites within every incorporated city in the state where, notwithstanding that an area may or may not be substantially surrounded by urban uses, the local jurisdictions most recent general plan or most recently adopted housing element certified by the Department of Housing and Community Development to be in compliance with state law has a zoning designation that is consistent with infill development.
(c)Subdivision (c) of Section 15300.2 of Title 14 of the California Code of Regulations does not apply to Section 15332 of Title 14 of the California Code of Regulations.
(d)If an infill project is not eligible for the categorical exemption pursuant to Section 15332 of Title 14 of the California Code of Regulations, only the reasons for the ineligibility shall be subject to CEQA review.
(e)This section and refinements developed by the Office of Land Use and Climate Innovation does not apply to a project to construct or that is related to a distribution center or oil and gas infrastructure.
SEC. 4.Section 21165.5 is added to the Public Resources Code, to read:21165.5.(a)If an action or proceeding alleging that a lead agency improperly applied to a project a statutory exemption pursuant to this division, or a categorical exemption, is successful, the subsequent environmental review for the project shall be limited to the facts the action or proceeding relied upon that disqualified the project from the statutory or categorical exemption.
(b)This section does not apply to a project to construct or that is related to a distribution center or oil and gas infrastructure.
SEC. 5.Section 21167.6 of the Public Resources Code is amended to read:21167.6.Notwithstanding any other law, in all actions or proceedings brought pursuant to Section 21167, except as provided in Section 21167.6.2 or those involving the Public Utilities Commission, all of the following shall apply:
(a)At the time that the action or proceeding is filed, the plaintiff or petitioner shall file a request that the respondent public agency prepare the record of proceedings relating to the subject of the action or proceeding. The request, together with the complaint or petition, shall be served personally upon the public agency not later than 10 business days from the date that the action or proceeding was filed.
(b)(1)(A)The public agency shall prepare and certify the record of proceedings not later than 60 days from the date that the request specified in subdivision (a) was served upon the public agency. Upon certification, the public agency shall lodge an electronic copy of the record of proceedings with the court and shall serve on the parties notice that the record of proceedings has been certified and lodged with the court. The parties shall pay any reasonable costs or fees imposed for the preparation of the record of proceedings in conformance with any law or rule of court.
(B)The court shall schedule a case management conference within 30 days of the filing of the complaint or petition pursuant to this division to review the scope, timing, and cost of the record of proceedings. The parties may stipulate to a partial record of proceedings that does not contain all the documents listed in subdivision (e) if approved by the court.
(2)The plaintiff or petitioner may elect to prepare the record of proceedings by providing a notice of the election to the public agency, or the parties may agree to an alternative method of preparation of the record of proceedings, subject to certification of its accuracy by the public agency, within the 60-day time limit specified in this subdivision.
(3)Notwithstanding paragraph (2), the public agency, within five business days of the receipt of the notice specified in paragraph (2), may deny the request of the plaintiff or petitioner to prepare the record of proceedings, in which case the public agency or the real party in interest shall bear the costs of preparation and certification of the record of proceedings, and those costs shall not be recoverable from the plaintiff or petitioner.
(c)The time limit established by subdivision (b) may be extended only upon the stipulation of all parties who have been properly served in the action or proceeding or upon order of the court. Extensions shall be liberally granted by the court when the size of the record of proceedings renders infeasible compliance with that time limit. There is no limit on the number of extensions that may be granted by the court, but no single extension shall exceed 60 days unless the court determines that a longer extension is in the public interest.
(d)If the public agency fails to prepare and certify the record of proceedings within the time limit established in paragraph (1) of subdivision (b), or any continuances of that time limit, the plaintiff or petitioner may move for sanctions, and the court may, upon that motion, grant appropriate sanctions.
(e)The record of proceedings shall include, but is not limited to, all of the following items:
(1)All project application materials.
(2)All staff reports and related documents prepared by the respondent public agency with respect to its compliance with the substantive and procedural requirements of this division and with respect to the action on the project.
(3)All staff reports and related documents prepared by the respondent public agency and written testimony or documents submitted by any person relevant to any findings or statement of overriding considerations adopted by the respondent agency pursuant to this division.
(4)Any transcript or minutes of the proceedings at which the decisionmaking body of the respondent public agency heard testimony on, or considered any environmental document on, the project, and any transcript or minutes of proceedings before any advisory body to the respondent public agency that were presented to the decisionmaking body before action on the environmental documents or on the project.
(5)All notices issued by the respondent public agency to comply with this division or with any other law governing the processing and approval of the project.
(6)All written comments received in response to, or in connection with, environmental documents prepared for the project, including responses to the notice of preparation.
(7)All written evidence or correspondence submitted to, or transferred from, the respondent public agency with respect to compliance with this division or with respect to the project.
(8)Any proposed decisions or findings submitted to the decisionmaking body of the respondent public agency by its staff, or the project proponent, project opponents, or other persons.
(9)The documentation of the final public agency decision, including the final environmental impact report, mitigated negative declaration, or negative declaration, and all documents, in addition to those referenced in paragraph (3), cited or relied on in the findings or in a statement of overriding considerations adopted pursuant to this division.
(10)Any other written materials relevant to the respondent public agencys compliance with this division or to its decision on the merits of the project, including the initial study, any drafts of any environmental document, or portions thereof, that have been released for public review, and copies of studies or other documents relied upon in any environmental document prepared for the project and either made available to the public during the public review period or included in the respondent public agencys files on the project, and all internal agency communications, including staff notes and memoranda related to the project or to compliance with this division, but not including communications of persons tangential to or far removed from project decisionmaking, unless those communications are related to a project that would construct or is related to a distribution center or oil and gas infrastructure, or that are of a logistical nature, such as meeting invitations and scheduling communications, except that any material that is subject to privileges contained in the Evidence Code, or exemptions contained in the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code) shall not be included in the record of proceedings under this paragraph, consistent with existing law.
(11)The full written record before any inferior administrative decisionmaking body whose decision was appealed to a superior administrative decisionmaking body before the filing of litigation.
(f)In preparing the record of proceedings, the party preparing the record of proceedings shall strive to do so at reasonable cost in light of the scope of the record of proceedings.
(g)The clerk of the superior court shall prepare and certify the clerks transcript on appeal not later than 60 days from the date that the notice designating the papers or records to be included in the clerks transcript was filed with the superior court, if the party or parties pay any costs or fees for the preparation of the clerks transcript imposed in conformance with any law or rules of court. Nothing in this subdivision precludes an election to proceed by appendix, as provided in Rule 8.124 of the California Rules of Court.
(h)Extensions of the period for the filing of any brief on appeal may be allowed only by stipulation of the parties or by order of the court for good cause shown. Extensions for the filing of a brief on appeal shall be limited to one 30-day extension for the preparation of an opening brief and one 30-day extension for the preparation of a responding brief, except that the court may grant a longer extension or additional extensions if it determines that there is a substantial likelihood of settlement that would avoid the necessity of completing the appeal.
(i)At the completion of the filing of briefs on appeal, the appellant shall notify the court of the completion of the filing of briefs, whereupon the clerk of the reviewing court shall set the appeal for hearing on the first available calendar date.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
|
Date
|
Status
|
|---|---|
| Sep 30, 2026 | Chaptered by Secretary of State. Chapter 972, Statutes of 2026. |
| Sep 30, 2026 | Approved by the Governor. |
| Aug 21, 2026 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 17, 2026 | Assembly amendments concurred in. (Ayes 40. Noes 0. Page 5486.) Ordered to engrossing and enrolling. |
| Aug 17, 2026 | Assembly amendments concurred in. (Ayes 40. Noes 0.) Ordered to engrossing and enrolling. |
| Aug 11, 2026 | From committee: That the Assembly amendments be concurred in. (Ayes 13. Noes 0. Page 5337.) |
| Aug 11, 2026 | From committee: That the Assembly amendments be concurred in. (Ayes 13. Noes 0.) |
| Aug 11, 2026 | Set for hearing August 11. |
| Aug 10, 2026 | From committee: Be re-referred to Com. on TRANS. pursuant to Senate Rule 29.10(d). (Ayes 5. Noes 0. Page 5328.) Re-referred to Com. on TRANS. |
| Aug 10, 2026 | From committee: Be re-referred to Com. on TRANS. pursuant to Senate Rule 29.10(d). (Ayes 5. Noes 0.) Re-referred to Com. on TRANS. |
| Aug 10, 2026 | Re-referred to Com. on RLS. pursuant to Senate Rule 29.10(d). |
| Aug 6, 2026 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 6, 2026 | Read third time. Passed. (Ayes 71. Noes 0. Page 6086.) Ordered to the Senate. |
| Aug 6, 2026 | Read third time. Passed. Ordered to the Senate. |
| Aug 3, 2026 | Read second time. Ordered to consent calendar. |
| Aug 3, 2026 | Read second time. Ordered to third reading. |
| Jul 2, 2026 | Read second time and amended. Ordered to second reading. |
| Jul 2, 2026 | From committee: Do pass as amended. Ordered to consent calendar. (Ayes 9. Noes 0.) (July 1). |
| Jun 23, 2026 | Coauthors revised. |
| Jun 23, 2026 | From committee: Do pass and re-refer to Com. on L. GOV. with recommendation: To consent calendar. (Ayes 16. Noes 0.) (June 22). Re-referred to Com. on L. GOV. |
| Jun 8, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on TRANS. |
| Jun 8, 2026 | Referred to Coms. on TRANS. and L. GOV. |
| Jan 20, 2026 | In Assembly. Read first time. Held at Desk. |
| Jan 20, 2026 | Read third time. Passed. (Ayes 37. Noes 0. Page 3249.) Ordered to the Assembly. |
| Jan 15, 2026 | Read second time. Ordered to consent calendar. |
| Jan 14, 2026 | From committee: Do pass. Ordered to consent calendar. (Ayes 7. Noes 0. Page 3224.) (January 14). |
| Jan 7, 2026 | Set for hearing January 14. |
| Jan 5, 2026 | Re-referred to Com. on ED. |
| Jan 5, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Sep 13, 2025 | Re-referred to Com. on RLS. |
| Sep 12, 2025 | Read second time and amended. Ordered to second reading. |
| Sep 12, 2025 | Ordered to second reading. |
| Sep 12, 2025 | From inactive file. |
| Sep 12, 2025 | Joint Rule 61(a)(13) suspended. (Ayes 28. Noes 8. Page 2999.) |
| Jun 5, 2025 | Ordered to inactive file on request of Senator Wiener. |
| May 28, 2025 | (Corrected May 28). |
| May 28, 2025 | Read second time and amended. Ordered to third reading. |
| May 27, 2025 | From committee: Do pass as amended. (Ayes 4. Noes 0. Page 1206.) (May 23). |
| May 20, 2025 | Set for hearing May 23. |
| May 19, 2025 | May 19 hearing: Placed on APPR. suspense file. |
| May 13, 2025 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on APPR. |
| May 9, 2025 | Set for hearing May 19. |
| May 1, 2025 | Read second time and amended. Re-referred to Com. on APPR. |
| Apr 30, 2025 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 5. Noes 1. Page 968.) (April 30). |
| Apr 23, 2025 | From committee: Do pass and re-refer to Com. on L. GOV. (Ayes 6. Noes 0. Page 867.) (April 23). Re-referred to Com. on L. GOV. |
| Apr 4, 2025 | Set for hearing April 30 in L. GOV. pending receipt. |
| Apr 2, 2025 | Set for hearing April 23. |
| Mar 24, 2025 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on E.Q. |
| Mar 20, 2025 | April 2 hearing postponed by committee. |
| Mar 11, 2025 | Set for hearing April 2. |
| Mar 5, 2025 | Referred to Coms. on E.Q. and L. GOV. |
| Feb 21, 2025 | From printer. May be acted upon on or after March 23. |
| Feb 20, 2025 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 17, 2026 | Unfinished Business SB607 Wiener et al. Concurrence | Senate Floor |
Passed |
|
| Aug 11, 2026 | That the Assembly amendments be concurred in | Senate Standing Committee on Transportation |
Passed |
|
| Aug 6, 2026 | SB 607 Wiener Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| Jul 1, 2026 | Do pass as amended. To Consent Calendar. | Assembly Standing Committee on Local Government |
Passed |
|
| Jun 22, 2026 | Do pass and be re-referred to the Committee on [Local Government] with recommendation: To Consent Calendar | Assembly Standing Committee on Transportation |
Passed |
|
| Jan 20, 2026 | Consent Calendar 2nd SB607 Wiener | Senate Floor |
Passed |
|
| Jan 14, 2026 | Do pass and be ordered to the Consent Calendar | Senate Standing Committee on Education |
Passed |
|
| May 23, 2025 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| May 19, 2025 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 30, 2025 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Local Government |
Passed |
|
| Apr 23, 2025 | Do pass, but first be re-referred to the Committee on [Local Government] | Senate Standing Committee on Environmental Quality |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 1000 Friends Protecting Historic Benicia | ** Against | |
| 350 Bay Area Action | ** Against | |
| 350 Conejo / San Fernando Valley | ** Against | |
| 350 South Bay Los Angeles | ** Against | |
| 350 Southland Legislative Alliance | ** Against | |
| AARP | ** Support | |
| Abundant Housing LA | ** Support | |
| Advocates for the Environment | ** Against | |
| Alta Peak Chapter, California Native Plant Society | ** Against | |
| American Council of Engineering Companies, California | ** Support | |
| American Council of Engineering Companies of California | ** Support | |
| American Planning Association, California Chapter | ** Support | |
| American River Trees | ** Against | |
| Animal Welfare Institute | ** Against | |
| Arroyos & Foothills Conservancy | ** Against | |
| Association Of Environmental Professionals | ** Support | |
| Ban SUP | ** Against | |
| Battle Creek Alliance | ** Against | |
| Bay Area Council | ** Support | |
| Beverly-Vermont Community Land Trust | ** Against | |
| Biodiversity First! | ** Against | |
| Biofuelwatch | ** Against | |
| Board of Supervisors County of Madera | ** Support | |
| Brentwood Alliance of Canyons & Hillsides | ** Against | |
| CA Assn of Winegrape Growers | ** Support | |
| California Apartment Association | ** Support | |
| California Big City Mayors Coalition | ** Support | |
| California Building Industry Association | ** Support | |
| California Business Properties Association | ** Support | |
| California Chamber Of Commerce | ** Support | |
| California Chaparral Institute | ** Against | |
| California Cities for Local Control | ** Against | |
| California Coastal Protection Network | ** Against | |
| California Comminuties Against Toxics | ** Against | |
| California Downtown Association | ** Support | |
| California Environmental Justice Alliance | ** Against | |
| California Environmental Justice Alliance Action | ** Against | |
| California Environmental Voters | ** Against | |
| California Federation of Labor Unions, Afl-cio | ** Against | |
| California Native Plant Society | ** Against | |
| Californians For Alternatives to Toxics | ** Against | |
| Californians for Pesticide Reform | ** Against | |
| California Nurses for Environmental Health and Justice | ** Against | |
| California Preservation Foundation | ** Against | |
| California River Watch | ** Against | |
| California Rural Legal Assistance Foundation | ** Against | |
| California State Association Of Counties | ** Support | |
| California State Council Of Laborers | ** Against | |
| California Wildlife Foundation/California Oaks | ** Against | |
| California YIMBY | ** Support | |
| Calwild | ** Against | |
| Canyon Back Alliance | ** Against | |
| Catalyst For Local Control | ** Against | |
| Center For Biological Diversity | ** Against | |
| Center for Community Action & Environmental Justice | ** Against | |
| Center For Environmental Health | ** Against | |
| Center For Food Safety | ** Against | |
| Center for Race, Poverty, and the Environment | ** Against | |
| Center on Race, Poverty & the Environment | ** Against | |
| Chamber Of Progress | ** Support | |
| Circulate San Diego | ** Support | |
| Citizens Committee to Complete the Refuge | ** Against | |
| Citizens for Los Angeles Wildlife | ** Against | |
| Citizens for the Preservation of Parks & Beaches | ** Against | |
| Citizens Preserving Venice | ** Against | |
| city of lynwood | ** Against | |
| cleanearth4kids.org | ** Against | |
| Clean Water Action | ** Against | |
| Cleveland National Forest Foundation | ** Against | |
| Cleveland National Forest Foundation / Save Our Forest and Ranchlands | ** Against | |
| Climate Action California | ** Against | |
| Climate Equity Policy Center | ** Against | |
| Climate First: Replacing Oil & Gas | ** Against | |
| Coalition for a Beautiful Los Angeles | ** Against | |
| Coast Action Group | ** Against | |
| Coastal Corridor Alliance | ** Against | |
| Coastal Environmental Rights Foundation | ** Against | |
| Coastal San Pedro Neighborhood Council | ** Against | |
| Comite Civico Del Valle | ** Against | |
| Communities for a Better Environment | ** Against | |
| Community Environmental Advocates Foundation | ** Against | |
| Conservation Congress CA | ** Against | |
| county of sacramento | ** Support | |
| D4ward | ** Against | |
| Defenders Of Wildlife | ** Against | |
| Earthjustice | ** Against | |
| East Bay YIMBY | ** Support | |
| East Yard Communities for Environmental Justice | ** Against | |
| Ecologistics | ** Against | |
| Elevate California | ** Support | |
| Elfin Forest / Harmony Grove Town Council | ** Against | |
| Endangered Habitats League | ** Against | |
| Environmental Action Committee of West Marin | ** Against | |
| Environmental Center of San Diego | ** Against | |
| Environmental Defense Center | ** Against | |
| Escondido Creek Conservancy | ** Against | |
| Esperanza Community Housing | ** Against | |
| Facts Families Advocating for Chemical and Toxics Safety | ** Against | |
| Fieldstead And Company, Inc. | ** Support | |
| Forests Forever | ** Against | |
| Forest Unlimited | ** Against | |
| Friends Foundation International | ** Against | |
| Friends of Ballona Wetlands | ** Against | |
| Friends of Gualala River | ** Against | |
| Friends of Harbors, Beaches and Parks | ** Against | |
| Friends of Lafferty Park | ** Against | |
| Friends of Loma Alta Creek | ** Against | |
| Friends of Rose Canyon | ** Against | |
| Friends of the Dunes | ** Against | |
| Friends of the Eel River | ** Against | |
| Friends of the Inyo | ** Against | |
| Friends Of The La River | ** Against | |
| Friends of the River | ** Against | |
| Friends of the West Shore | ** Against | |
| Fullerton Heritage | ** Against | |
| Golden Gate Bridge, Highway & Transportation District | ** Support | |
| Greater Conejo Valley Chamber of Commerce | ** Support | |
| Greenfield Walking Group | ** Against | |
| Green Foothills | ** Against | |
| Grow the Richmond | ** Support | |
| Hills2000_friends of the Hills | ** Against | |
| Hills for Everyone | ** Against | |
| Homey | ** Against | |
| Housing Action Coalition | ** Support | |
| In Defense of Animals | ** Against | |
| Inner City Law Center | ** Support | |
| Institute for Responsive Government Action | ** Support | |
| International Union of Operating Engineers, Cal-Nevada Conference | ** Support | |
| Ks Connectivity | ** Against | |
| Landwatch Monterey County | ** Against | |
| Landwatch - San Luis Obispo County | ** Against | |
| Leadership Council for Justice and Accountability | ** Against | |
| LeadingAge California | ** Support | |
| League Of California Cities | ** Support | |
| League Of Women Voters Of California | ** Support | |
| Lisc San Diego | ** Support | |
| Long Beach Alliance for Clean Energy | ** Against | |
| Long Beach Heritage | ** Against | |
| Los Angeles Alliance for a New Economy | ** Against | |
| Los Angeles Audubon Society | ** Against | |
| Los Angeles Neighborhood Land Trust | ** Against | |
| Los Angeles Waterkeeper | ** Against | |
| Los Cerritos Wetlands Land Trust | ** Against | |
| Los Padres Forest Watch | ** Against | |
| Lynwood City Of | ** Against | |
| LYNWOOD; CITY OF | ** Against | |
| Madrone Audubon Society, Sonoma County | ** Against | |
| Marin Conservation League | ** Against | |
| Mission Street Neighbors | ** Against | |
| morongo basin conservation association | ** Against | |
| Mountain Area Preservation | ** Against | |
| Mountain View YIMBY | ** Support | |
| Move LA | ** Against | |
| Napa-Solano for Everyone | ** Support | |
| Natural Resources Defense Council | ** Against | |
| Neighborhood Coalition Sonoma County | ** Against | |
| New Livable California Dba Livable California | ** Against | |
| North County Watch | ** Against | |
| Northern Chumash Tribal Council | ** Against | |
| Northern Neighbors | ** Support | |
| Owens Valley Committee | ** Against | |
| Palos Verdes South Bay Audubon | ** Against | |
| Partnership for Policy Integrity | ** Against | |
| Paula Lane Action Network | ** Against | |
| Peninsula for Everyone | ** Support | |
| Pesticide Action & Agroecology Network | ** Against | |
| Petaluma River Council | ** Against | |
| Physicians for Social Responsibility - Los Angeles | ** Against | |
| Physicians for Social Responsibility-San Francisco Bay Area Chapter | ** Against | |
| Planning And Conservation League | ** Against | |
| Poder SF | ** Against | |
| Poison Free Malibu | ** Against | |
| Preservation Action Council of San Jose | ** Against | |
| Preserve Calavera | ** Against | |
| Preserve Rural Sonoma County | ** Against | |
| Preserve the American River | ** Against | |
| Preserve Wild Santee | ** Against | |
| Prosperity California | ** Support | |
| Protect Ballona Wetlands | ** Against | |
| Protect San Benito County | ** Against | |
| Public Interest Law Project | ** Against | |
| Queers X Climate | ** Against | |
| Race & Equity in All Planning Coalition | ** Against | |
| Raptors Are The Solution | ** Against | |
| Redlands YIMBY | ** Support | |
| Respct - Residents for an Equitable San Pedro Community Today | ** Against | |
| River City Waterway Alliance | ** Against | |
| Rose Foundation for Communities and the Environment | ** Against | |
| Rural Canyons Conservation Fund | ** Against | |
| Rural County Representatives of California | ** Support | |
| Russian Riverkeeper | ** Against | |
| Safe Routes Partnership | ** Against | |
| Saje | ** Against | |
| San Bernardino County | ** Support | |
| San Francisco Baykeeper | ** Against | |
| Santa Barbara Audobon Society | ** Against | |
| Santa Clara Valley Bird Alliance | ** Against | |
| Santa Cruz Climate Action Network | ** Against | |
| Santa Cruz Yimby | ** Support | |
| Santa Rosa Yimby | ** Support | |
| Santa Susana Mountain Park Association | ** Against | |
| Save Lafayette | ** Against | |
| Save Our Heritage Organization | ** Against | |
| Save the American River Association | ** Against | |
| Save the Park | ** Against | |
| Save the Sonoma Coast | ** Against | |
| SC Wildlands | ** Against | |
| Sf Yimby | ** Support | |
| Sierra Club California | ** Against | |
| Sierra Nevada Alliance | ** Against | |
| Sierra Watch | ** Against | |
| SoCal 350 Climate Action | ** Against | |
| Solano County Orderly Growth Committee | ** Against | |
| Sonoma County Climate Activist Network | ** Against | |
| Sonoma Land Trust | ** Against | |
| Sonoma Mountain Preservation | ** Against | |
| South Bay Yimby | ** Support | |
| south of market community action network | ** Against | |
| South Pasadena Residents for Responsible Growth | ** Support | |
| Southwest Wetlands Interpretive Association | ** Against | |
| SPUR | ** Support | |
| State Alliance for Firesafe Road Regulations | ** Against | |
| State Building & Construction Trades Council Of California | ** Against | |
| Streets for All | ** Support | |
| Sunflower Alliance | ** Against | |
| Sunnyvale United Neighbors | ** Against | |
| Tahoe Sierra Clean Air Coalition | ** Against | |
| The Big Wild | ** Against | |
| The River Otter Ecology Project | ** Against | |
| the River Project | ** Against | |
| The Two Hundred | ** Support | |
| The Urban Wildlands Group | ** Against | |
| Transition Sonoma Valley | ** Against | |
| Transportation Solutions Defense and Education Fund | ** Against | |
| Truckee Tahoe Workforce Housing Agency | ** Support | |
| Turtle Island Restoration Network | ** Against | |
| Union Of Concerned Scientists | ** Against | |
| UNITE HERE Local 11 | ** Against | |
| Urban Habitat | ** Against | |
| Urban Wildlife Research Project | ** Against | |
| Ventura County YIMBY | ** Support | |
| We Advocate Through Environmental Review | ** Against | |
| West Berkeley Alliance for Clean Air and Safe Jobs | ** Against | |
| West County Rural Alliance | ** Against | |
| western center on law & poverty | ** Against | |
| Wishtoyo Foundation | ** Against | |
| Yimby Action | ** Support | |
| YIMBY LA | ** Support | |
| Yimby SLO | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 607 |
UNFINISHED BUSINESS
Bill No: SB 607
Author: Wiener (D), et al.
Amended: 7/2/26
Vote: 21
PRIOR SENATE VOTES NOT RELEVANT PURSUANT TO SENATE RULE 29.10(d)
SENATE TRANSPORTATION COMMITTEE: 13-0, 8/11/26
AYES: Cortese, Strickland, Archuleta, Arreguín, Blakespear, Dahle, Gonzalez, Grayson, Menjivar, Richardson, Seyarto, Valladares, Wiener
ASSEMBLY FLOOR: 71-0, 8/6/26 (Consent) - See last page for vote
SUBJECT: Golden Gate Bridge, Highway and Transportation District: contributions and loans
SOURCE: Golden Gate Bridge, Highway, and Transportation District
DIGEST:
This bill authorizes the Golden Gate Bridge, Highway, and Transportation District (District) to accept contributions and loans from the state and the United States for the purpose of financing capital improvements related to seismic safety on the Golden Gate Bridge, as specified.
Assembly Amendments
remove the previous contents of the bill as passed by the Senate and insert current provisions.
ANALYSIS:
Existing law:
- Authorizes the formation of a bridge and highway district, prescribing related procedural and governance requirements, powers and duties, taxation, bonding, toll and financing authorities.
- Establishes the District as a special district to operate and maintain the Golden Gate Bridge and two public transit systems (Golden Gate Transit and Golden Gate Ferry) connecting the counties of Marin, Sonoma, San Francisco, and Contra Costa.
- Prohibits the District from issuing general obligation bonds, revenue bonds, or any other form of long-term indebtedness except to finance its interim system of buses and ferries or to finance capital improvements or modifications relating to seismic safety of the bridge.
- Authorizes a district to sell or issue bonds, if approved by a 2/3 vote threshold in a special election in all of the counties that make up the District, and imposes related procedural and due process requirements.
- Authorizes the use of toll revenues to pay any indebtedness or lien against a district.
This bill:
- Provides that the District may accept contributions or loans from the United States or this state or any of its political subdivisions, or any department, instrumentality, agency, or authority of either thereof, for the purpose of financing capital improvements or modifications relating to seismic safety of the bridge.
- Specifies that the District may authorize the acceptance of those contributions or loans by resolution, which shall specify the purposes for which the contribution or loan is being accepted, the maximum principal amount of the loan, and the maximum rate of interest to be payable on the loan, as applicable.
- Provides that the District may do any and all things necessary in order to avail itself of that aid, assistance, and cooperation under any federal or state legislation now or hereafter enacted, including pledging toll revenues for the repayment of those loans and entering into contracts ancillary to those loans. Any evidence of specified indebtedness shall constitute a negotiable instrument.
- Clarifies that this bill is a complete, additional, and alternative method for the District to authorize and accept a contribution or loan from an entity for the purposes specified herein and shall be regarded as supplemental and additional to all other powers conferred to the District by law.
Comments
- Purpose of the bill. According to the author, “The Golden Gate Bridge is a critical, iconic piece of infrastructure and symbol of our state. The bridge - constructed in a period of great adversity - was an engineering marvel of its time, and it continues to serve millions of people every year - whether they drive, ride the bus, walk, or bike on the bridge. By modernizing the Golden Gate Bridge District’s ability to enter into long-term loan agreements, SB 607 will help ensure the Golden Gate Bridge remains safe, seismically resilient, and operational for generations to come.”
- Golden Gate Bridge, Highway, and Transportation District. The development and construction of the Golden Gate Bridge has a long and storied history. Motivated by the immense popularity of the automobile, ferry congestion and unreliability, stunted economic development in San Francisco due to the lack of a fixed crossing, San Francisco City Engineer Michael O'Shaughnessy, Secretary to the Mayor Edward Rainey, and engineer Joseph B. Strauss believed a special district was needed to oversee financing, design, and construction so that all affected counties could be heard and represented. In 1923, the Bridging the Golden Gate Association was formed to advocate and campaign for the construction of a bridge. That same year, Governor Friend William Richardson signed a bill by Assemblyman Frank Coombs creating the District. Today, the Golden Gate Bridge spans the Golden Gate Strait linking the City of San Francisco and the counties to the north. Serving up to 40 million vehicles a year, it serves a vital transportation link for the San Francisco Bay Area. In addition to operating and maintaining the Golden Gate Bridge, the District also operates two public transit systems, Golden Gate Transit and Golden Gate Ferry, connecting the counties of Marin, Sonoma, San Francisco, and Contra Costa.
- Golden Gate Bridge Seismic Safety. The Loma Prieta Earthquake was a magnitude of 7.1 on October 17, 1989. According to the District, “Immediately following the Loma Prieta quake, the District engaged a team of consultants to conduct a vulnerability study. The conclusion of the study was that under a Richter magnitude 7.0 or greater earthquake with an epicenter near the Bridge, it would experience severe damage that could close this important transportation link for an extended period. If a Richter magnitude 8.0 or greater earthquake centered near the Bridge, there would be a substantial risk of impending collapse of the San Francisco and Marin Approach Viaducts and the Fort Point Arch, and extensive damage to the remaining Bridge structures, including the Main Suspension Bridge. It must be noted that, as of July 2008, with the completion of the second phase of construction, the seismic retrofit of the Golden Gate Bridge is far enough along that the Bridge no longer faces the potential for collapse and until the entire retrofit is completed, the risk of significant damage to the Main Suspension Bridge remains.
“After determining that retrofitting the Bridge would be more cost-effective than replacing it, in 1992, the District hired engineering consultants to develop seismic retrofit design criteria. As part of this task, the site-specific design ground motions associated with different magnitudes of earthquakes and expected performance levels were defined as the basis for the Bridge retrofit design. The site-specific, moderate earthquake was defined as one having a 10 percent chance of being exceeded in a 50-year period or having an acceleration of 0.46g. The site-specific, maximum credible earthquake was defined as one having a return period of 1,000 years or having an acceleration of 0.65g, which is equivalent to the 1906 San Francisco earthquake of a magnitude 8.3 on the Richter scale.”
In 1996, three construction phases were established as follows:
- Phase 1: Retrofit the Marin (north) Approach Viaduct, which took place from 1997-2001, cost $71 million.
- Phase 2: Retrofit the San Francisco (south) Approach Viaduct, San Francisco (south) Anchorage Housing, Fort Point Arch, and Pylons S1 and S2, which took place from 2001-2008, cost $189 million.
- Phase 3A and 3B: Retrofit the Main Suspension Bridge and Marin (north) Anchorage Housing. Phase 3A took place from 2008-2014 and cost $125 million.
Phase 3B, the final phase, includes upgrades to the 4,200-foot main span, two 1,125-foot side spans, the two 746-foot towers, and repainting of the South Tower. Construction Contract #1 for the final phase was awarded in December 2025 and is planned to be undertaken from 2026-2031. The budget for Contract #1 is $1.012 billion and is funded by a mix of federal, state, and bridge toll funds, specifically, $396 million, or 39%, from the Federal Bridge Investment Program (BIP); $200 million or 20%, from the Federal Highway Bridge Program (HBP) through the California Department of Transportation (Caltrans); and $416 million or 41% from local bridge tolls.
Following completion of Contract #1 in 2031, the District plans to award Contract #2 (planned 2031-2036) for seismic retrofit of the Bridge’s main center span, which is nearly twice the length of the two side spans. The estimated cost for Construction Contract #2 is approximately $1 billion.
- Financial pressures create a need for long-term financing to complete the retrofit. As noted above, the District has fully funded Construction Contract #1. However, the District is currently evaluating all viable funding options for the final phase, including toll increases, borrowing, and additional external funding.
According to the District, it is “facing several pressures, creating an immediate need for long-term financing. The commitment of $416 million of tolls to Contract 1 will significantly reduce our reserves. Furthermore, downtown San Francisco is still recovering from the pandemic, which equates to less toll dollars. Weekday morning commute traffic remains approximately 25 percent below pre-pandemic levels, reducing toll revenues – the District’s primary funding source for Bridge operations, maintenance, and transit service.”
Additionally, the District’s bus driver pension plan, known as the Golden Gate Transit Amalgamated Retirement Plan (GGTARP), is underfunded. The current retirement plan’s funded ratio is 42.9%, meaning that its current estimated assets are projected to be able to pay 43 cents for every $1 of the projected retirement benefits owed over the life expectancies of all the pension fund’s members. As stated by the District: “The District will need the financial flexibility to provide additional funding to GGTARP. The ability to take on long-term debt for seismically retrofitting the Bridge would provide the District with the capacity to use a portion of its reserves to provide additional funding to GGTARP.”
- SB 607 clarifies the District’s borrowing authority, but is it needed? This bill authorizes a streamlined approach to borrowing for the District to finance the final phase of the seismic retrofit project. Specifically, the bill clarifies that the District can accept proceeds from a loan, and provides that it may authorize such activities through a resolution detailing the parameters of the loan.
According to the District, its ability to directly issue debt is significantly more restrictive than that of comparable public agencies. Existing law authorizes the District to issue bonds and “any other form of long-term indebtedness” for financing capital improvements related to seismic safety of the Bridge and to finance its bus and ferry services. However, in order for the District to issue bonds, it must seek a 2/3rds majority vote from all of its voters in the 6 counties that make up its Board – Del Norte, Mendocino, Napa, Sonoma, Marin, and San Francisco.
The District is seeking to utilize borrowing without directly issuing bonds. The District intends to use conduit loan financing, which involves a government entity issuing tax-exempt municipal bonds and then lending the proceeds to a public or private entity which pays back the loan. The public agencies issuing the bonds are not responsible for paying the bond investors back; rather, they serve as a conduit connecting borrowers to investors. The California Infrastructure and Economic Development Bank (I-Bank) routinely provides conduit financing.
Specifically, the District would partner with a conduit revenue bond issuer to finance the seismic retrofit project. The conduit issuer would issue bonds and enter into a loan agreement with the District, through which the proceeds of the bonds would be provided to the District for the project. The District would make loan payments to the conduit issuer, and those funds would then be applied to repay the bonds. The District’s toll revenues would guarantee repayment of the loan.
It is unclear whether the District needs the provisions of this bill to proceed with their financing plans for the remainder of the project. Given its ability to issue debt under current law, and as the District would not actually issue the bonds itself, the District may already have the authority to participate in conduit financing and not be required to seek 2/3rds vote approval. While the District itself would not issue bonds in a conduit financing scheme, it asserts there is sufficient legal ambiguity to warrant the provisions of this bill.
FISCAL EFFECT: Appropriation: No Fiscal Com.: No Local: No
SUPPORT: (Verified 8/11/26)
Golden Gate Bridge, Highway & Transportation District (source)
International Union of Operating Engineers, Cal-Nevada Conference
OPPOSITION: (Verified 8/11/26)
None received
ARGUMENTS IN SUPPORT: Writing in support of the bill, the International Union of Operating Engineers, Cal-Nevada Conference states, “The District awarded Construction Contract 1 in December 2025 to retrofit the Bridge’s north and south towers and side spans. Contract 1 is anticipated to employ on-site over 220 ironworkers, over 70 painters, as well as numerous laborers, carpenters and our members- Operating Engineers. Following completion of Contract 1 in 2031, the District plans to award Contract 2 for seismic retrofit of the Bridge’s main center span, which is nearly twice the length of the two side spans.
“The District is facing several pressures, creating an immediate need for long-term financing. Existing law already provides cities, counties, and special districts with broad authority to use various forms of debt financing. However, the District’s authorizing statute restricts the District’s use of debt financing. SB 607 (Wiener) would remedy this by authorizing a streamlined form of borrowing that does not require full bond issuance authority.”
ASSEMBLY FLOOR: 71-0, 8/6/26
AYES: Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Chen, Connolly, Davies, DeMaio, Dixon, Elhawary, Ellis, Gabriel, Garcia, Gipson, Jeff Gonzalez, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Johnson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ta, Tangipa, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NO VOTE RECORDED: Addis, Castillo, Flora, Fong, Blanca Rubio, Sanchez, Schiavo, Valencia
Prepared by: Melissa White / TRANS. / (916) 651-4121
8/12/26 16:19:06
**** END ****
SENATE COMMITTEE ON TRANSPORTATION
Senator Dave Cortese, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 8/11/2026
Author: | Wiener | ||
Version: | 7/2/2026 Amended | ||
Urgency: | No | Fiscal: | No |
Consultant: | Melissa White | ||
SUBJECT:
DIGEST: This bill authorizes the Golden Gate Bridge, Highway, and Transportation District (District) to accept contributions and loans from the state and the United States for the purpose of financing capital improvements related to seismic safety on the Golden Gate Bridge, as specified.
ANALYSIS:
Existing law:
- Authorizes the formation of a bridge and highway district, prescribing related procedural and governance requirements, powers and duties, taxation, bonding, toll and financing authorities.
- Establishes the District as a special district to operate and maintain the Golden Gate Bridge and two public transit systems (Golden Gate Transit and Golden Gate Ferry) connecting the counties of Marin, Sonoma, San Francisco, and Contra Costa.
- Prohibits the District from issuing general obligation bonds, revenue bonds, or any other form of long-term indebtedness except to finance its interim system of buses and ferries or to finance capital improvements or modifications relating to seismic safety of the bridge.
- Authorizes a district to sell or issue bonds, if approved by a 2/3 vote threshold in a special election in all of the counties that make up the District, and imposes related procedural and due process requirements.
- Authorizes the use of toll revenues to pay any indebtedness or lien against a district.
This bill:
- Provides that the District may accept contributions or loans from the United States or this state or any of its political subdivisions, or any department, instrumentality, agency, or authority of either thereof, for the purpose of financing capital improvements or modifications relating to seismic safety of the bridge.
- Specifies that the District may authorize the acceptance of those contributions or loans by resolution, which shall specify the purposes for which the contribution or loan is being accepted, the maximum principal amount of the loan, and the maximum rate of interest to be payable on the loan, as applicable.
- Provides that the District may do any and all things necessary in order to avail itself of that aid, assistance, and cooperation under any federal or state legislation now or hereafter enacted, including pledging toll revenues for the repayment of those loans and entering into contracts ancillary to those loans. Any evidence of specified indebtedness shall constitute a negotiable instrument.
- Clarifies that this bill is a complete, additional, and alternative method for the District to authorize and accept a contribution or loan from an entity for the purposes specified herein and shall be regarded as supplemental and additional to all other powers conferred to the District by law.
COMMENTS:
- Purpose of the bill. According to the author, “The Golden Gate Bridge is a critical, iconic piece of infrastructure and symbol of our state. The bridge - constructed in a period of great adversity - was an engineering marvel of its time, and it continues to serve millions of people every year - whether they drive, ride the bus, walk, or bike on the bridge. By modernizing the Golden Gate Bridge District’s ability to enter into long-term loan agreements, SB 607 will help ensure the Golden Gate Bridge remains safe, seismically resilient, and operational for generations to come.”
- Golden Gate Bridge, Highway, and Transportation District. The development and construction of the Golden Gate Bridge has a long and storied history. Motivated by the immense popularity of the automobile, ferry congestion and unreliability, stunted economic development in San Francisco due to the lack of a fixed crossing, San Francisco City Engineer Michael O'Shaughnessy, Secretary to the Mayor Edward Rainey, and engineer Joseph B. Strauss believed a special district was needed to oversee financing, design, and construction so that all affected counties could be heard and represented. In 1923, the Bridging the Golden Gate Association was formed to advocate and campaign for the construction of a bridge. That same year, Governor Friend William Richardson signed a bill by Assemblyman Frank Coombs creating the District. Today, the Golden Gate Bridge spans the Golden Gate Strait linking the City of San Francisco and the counties to the north. Serving up to 40 million vehicles a year, it serves a vital transportation link for the San Francisco Bay Area.
In addition to operating and maintaining the Golden Gate Bridge, the District also operates two public transit systems, Golden Gate Transit and Golden Gate Ferry, connecting the counties of Marin, Sonoma, San Francisco, and Contra Costa. In 1969, the Legislature passed AB 584 (Foran, Chapter 584, Statutes of 1969), authorizing the District to develop a transportation facility plan for implementing a mass transportation program in the U.S. Highway 101/Golden Gate Corridor. This was to include any and all forms of transit, including ferry. At that time, the word “Transportation” was added to the District name to indicate its new commitment to public transportation.
The District is required to have a board that consists of 17 members as follows:
- One director representing Del Norte County, one director representing Mendocino County, and one director representing Napa County, appointed by the board of supervisors of the respective represented county.
- Four directors representing Marin County, appointed by the board of supervisors. One of the directors must be an elected member of the board of supervisors, another must be an elected member of a city council of a city within Marin County, and another must be a member of the general public.
- Three directors representing Sonoma County, appointed by the board of supervisors. One of the directors may be an elected member of the board of supervisors, and another of the directors must be an elected member of a city council of a city within Sonoma County.
- Nine directors, representing the City and County of San Francisco, eight of whom must be appointed by the board of supervisors, and one of whom must be appointed by the mayor. Four of the directors shall be elected members of the board of supervisors.
- Golden Gate Bridge Seismic Safety. The Loma Prieta Earthquake was a magnitude of 7.1 on October 17, 1989. According to the District, “Immediately following the Loma Prieta quake, the District engaged a team of consultants to conduct a vulnerability study. The conclusion of the study was that under a Richter magnitude 7.0 or greater earthquake with an epicenter near the Bridge, it would experience severe damage that could close this important transportation link for an extended period. If a Richter magnitude 8.0 or greater earthquake centered near the Bridge, there would be a substantial risk of impending collapse of the San Francisco and Marin Approach Viaducts and the Fort Point Arch, and extensive damage to the remaining Bridge structures, including the Main Suspension Bridge. It must be noted that, as of July 2008, with the completion of the second phase of construction, the seismic retrofit of the Golden Gate Bridge is far enough along that the Bridge no longer faces the potential for collapse and until the entire retrofit is completed, the risk of significant damage to the Main Suspension Bridge remains.
“After determining that retrofitting the Bridge would be more cost-effective than replacing it, in 1992, the District hired engineering consultants to develop seismic retrofit design criteria. As part of this task, the site-specific design ground motions associated with different magnitudes of earthquakes and expected performance levels were defined as the basis for the Bridge retrofit design. The site-specific, moderate earthquake was defined as one having a 10 percent chance of being exceeded in a 50-year period or having an acceleration of 0.46g. The site-specific, maximum credible earthquake was defined as one having a return period of 1,000 years or having an acceleration of 0.65g, which is equivalent to the 1906 San Francisco earthquake of a magnitude 8.3 on the Richter scale.”
In 1996, three construction phases were established as follows:
- Phase 1: Retrofit the Marin (north) Approach Viaduct, which took place from 1997-2001, cost $71 million.
- Phase 2: Retrofit the San Francisco (south) Approach Viaduct, San Francisco (south) Anchorage Housing, Fort Point Arch, and Pylons S1 and S2, which took place from 2001-2008, cost $189 million.
- Phase 3A and 3B: Retrofit the Main Suspension Bridge and Marin (north) Anchorage Housing. Phase 3A took place from 2008-2014 and cost $125 million.
Phase 3B, the final phase, includes upgrades to the 4,200-foot main span, two 1,125-foot side spans, the two 746-foot towers, and repainting of the South Tower. Construction Contract #1 for the final phase was awarded in December 2025 and is planned to be undertaken from 2026-2031. The budget for Contract #1 is $1.012 billion and is funded by a mix of federal, state, and bridge toll funds, specifically, $396 million, or 39%, from the Federal Bridge Investment Program (BIP); $200 million or 20%, from the Federal Highway Bridge Program (HBP) through the California Department of Transportation (Caltrans); and $416 million or 41% from local bridge tolls.
Following completion of Contract #1 in 2031, the District plans to award Contract #2 (planned 2031-2036) for seismic retrofit of the Bridge’s main center span, which is nearly twice the length of the two side spans. The estimated cost for Construction Contract #2 is approximately $1 billion.
- Financial pressures create a need for long-term financing to complete the retrofit. As noted above, the District has fully funded Construction Contract #1. However, the District is currently evaluating all viable funding options for the final phase, including toll increases, borrowing, and additional external funding.
According to the District, it is “facing several pressures, creating an immediate need for long-term financing. The commitment of $416 million of tolls to Contract 1 will significantly reduce our reserves. Furthermore, downtown San Francisco is still recovering from the pandemic, which equates to less toll dollars. Weekday morning commute traffic remains approximately 25 percent below pre-pandemic levels, reducing toll revenues – the District’s primary funding source for Bridge operations, maintenance, and transit service.”
Additionally, the District’s bus driver pension plan, known as the Golden Gate Transit Amalgamated Retirement Plan (GGTARP), is underfunded. The current retirement plan’s funded ratio is 42.9%, meaning that its current estimated assets are projected to be able to pay 43 cents for every $1 of the projected retirement benefits owed over the life expectancies of all the pension fund’s members. As stated by the District: “The District will need the financial flexibility to provide additional funding to GGTARP. The ability to take on long-term debt for seismically retrofitting the Bridge would provide the District with the capacity to use a portion of its reserves to provide additional funding to GGTARP.”
- SB 607 clarifies the District’s borrowing authority, but is it needed? SB 607 authorizes a streamlined approach to borrowing for the District to finance the final phase of the seismic retrofit project. Specifically, the bill clarifies that the District can accept proceeds from a loan, and provides that it may authorize such activities through a resolution detailing the parameters of the loan.
According to the District, its ability to directly issue debt is significantly more restrictive than that of comparable public agencies. Existing law authorizes the District to issue bonds and “any other form of long-term indebtedness” for financing capital improvements related to seismic safety of the Bridge and to finance its bus and ferry services. However, in order for the District to issue bonds, it must seek a 2/3rds majority vote from all of its voters in the 6 counties that make up its Board – Del Norte, Mendocino, Napa, Sonoma, Marin, and San Francisco.
The District is seeking to utilize borrowing without directly issuing bonds. The District intends to use conduit loan financing, which involves a government entity issuing tax-exempt municipal bonds and then lending the proceeds to a public or private entity which pays back the loan. The public agencies issuing the bonds are not responsible for paying the bond investors back; rather, they serve as a conduit connecting borrowers to investors. The California Infrastructure and Economic Development Bank (I-Bank) routinely provides conduit financing.
Specifically, the District would partner with a conduit revenue bond issuer to finance the seismic retrofit project. The conduit issuer would issue bonds and enter into a loan agreement with the District, through which the proceeds of the bonds would be provided to the District for the project. The District would make loan payments to the conduit issuer, and those funds would then be applied to repay the bonds. The District’s toll revenues would guarantee repayment of the loan.
It is unclear whether the District needs the provisions of SB 607 to proceed with their financing plans for the remainder of the project. Given its ability to issue debt under current law, and as the District would not actually issue the bonds itself, the District may already have the authority to participate in conduit financing and not be required to seek 2/3rds vote approval. While the District itself would not issue bonds in a conduit financing scheme, it asserts there is sufficient legal ambiguity to warrant the provisions of the bill.
Writing in support of the bill, the International Union of Operating Engineers, Cal-Nevada Conference states, “The District awarded Construction Contract 1 in December 2025 to retrofit the Bridge’s north and south towers and side spans. Contract 1 is anticipated to employ on-site over 220 ironworkers, over 70 painters, as well as numerous laborers, carpenters and our members- Operating Engineers. Following completion of Contract 1 in 2031, the District plans to award Contract 2 for seismic retrofit of the Bridge’s main center span, which is nearly twice the length of the two side spans.
“The District is facing several pressures, creating an immediate need for long-term financing. Existing law already provides cities, counties, and special districts with broad authority to use various forms of debt financing. However, the District’s authorizing statute restricts the District’s use of debt financing. SB 607 (Wiener) would remedy this by authorizing a streamlined form of borrowing that does not require full bond issuance authority.”
- Gut and Amend. SB 607 is being heard in this committee pursuant to Senate Rule 29.10 (d). SB 607 was amended in the Assembly to delete provisions related to the University of California and insert its current provisions pertaining to the Golden Gate Bridge, Highway, and Transportation District.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
POSITIONS: (Communicated to the committee by Friday, August 7, 2026.)
SUPPORT:
Golden Gate Bridge, Highway & Transportation District (sponsor)
International Union of Operating Engineers, Cal-Nevada Conference
OPPOSITION:
None received
-- END --
ASSEMBLY COMMITTEE ON LOCAL GOVERNMENT
Juan Carrillo, Chair
SBPCA Bill Id:SB 607
Author:(Wiener) – As Amended Ver:June 8, 2026
SENATE VOTE: 37-0
SUBJECT: Golden Gate Bridge, Highway and Transportation District: contributions and loans.
SUMMARY: Authorizes the Golden Gate Bridge, Highway and Transportation District (District) to accept contributions and loans from the State and the United States for the purpose of financing capital improvements related to seismic safety on the Golden Gate Bridge (GGB), as specified. Specifically, this bill:
- Provides that the District may accept contributions or loans from the United States or this state or any of its political subdivisions, or any department, instrumentality, agency, or authority of either thereof, for the purpose of financing capital improvements or modifications relating to seismic safety of the bridge.
- Specifies that the District may authorize the acceptance of those contributions or loans in 1), above, by resolution, which shall specify the purposes for which the contribution or loan is being accepted, the maximum principal amount of the loan, and the maximum rate of interest to be payable on the loan, as applicable.
- Provides that the District may do any and all things necessary in order to avail itself of that aid, assistance, and cooperation under any federal or state legislation now or hereafter enacted, including pledging toll revenues for the repayment of those loans and entering into contracts ancillary to those loans. Any evidence of specified indebtedness shall constitute a negotiable instrument.
- Clarifies that this bill is a complete, additional, and alternative method for the District to authorize and accept a contribution or loan from an entity for the purposes specified herein and shall be regarded as supplemental and additional to all other powers conferred to the District by law.
EXISTING LAW:
- Authorizes the formation of a bridge and highway district, prescribing related procedural and governance requirements, powers and duties, taxation, bonding, toll and financing authorities [Streets and Highways Code (SHC) § 27000, et seq.].
- Authorizes a district to sell or issue bonds, if approved by a 2/3 vote threshold in a special election, and imposes related procedural and due process requirements (SHC § 27226).
- Authorizes the use of toll revenues to pay any indebtedness or lien against a district (SHC § 27281).
- Establishes the District as a special district to operate and maintain the GGB and two public transit systems (Golden Gate Transit and Golden Gate Ferry) connecting the counties of Marin, Sonoma, San Francisco, and Contra Costa (SHC § 27500).
- Prohibits the District from issuing general obligation bonds, revenue bonds, or any other form of long-term indebtedness except to finance its interim system of buses and ferries or to finance capital improvements or modifications relating to seismic safety of the bridge (SHC § 27556).
FISCAL EFFECT: None.
COMMENTS:
- Bill Summary. This bill authorizes the District to accept contributions and loans from the State and the United States for the purpose of financing capital improvements related to seismic safety on the GGB, as specified. This bill allows the District to accept those contributions or loans by resolution, which must specify the purposes for which the contribution or loan is being accepted, the maximum principal amount of the loan, and the maximum rate of interest to be payable on the loan, as applicable. Lastly, this bill provides that the District may pledge toll revenues for the repayment of those loans and may enter into contracts ancillary to those loans. The District is the sponsor of this bill.
- Author’s Statement. According to the Author, “The Golden Gate Bridge is a critical, iconic piece of infrastructure and symbol of our state. The bridge - constructed in a period of great adversity - was an engineering marvel of its time, and it continues to serve millions of people every year - whether they drive, ride the bus, walk, or bike on the bridge. By modernizing the Golden Gate Bridge District’s ability to enter into long-term loan agreements, SB 607 will help ensure the Golden Gate Bridge remains safe, seismically resilient, and operational for generations to come.”
- Golden Gate Bridge, Highway and Transportation District. Formed in 1928, the District is a special district which operates and maintains the Golden Gate Bridge and two unified public transit systems, Golden Gate Transit and Golden Gate Ferry, connecting the counties of Marin, Sonoma, San Francisco, and Contra Costa. In 1969, the Legislature passed AB 584 (Foran), Chapter 584, Statutes of 1969, authorizing the District to develop a transportation facility plan for implementing a mass transportation program in the U.S. Highway 101/Golden Gate Corridor. This was to include any and all forms of transit, including ferry. At that time, the word “Transportation” was added to the District name to indicate its new commitment to public transportation. The District is required to have a board that consists of 17 members as follows:
- One director representing Del Norte County, one director representing Mendocino County, and one director representing Napa County, appointed by the board of supervisors of the respective represented county.
- Four directors representing Marin County, appointed by the board of supervisors. One of the directors must be an elected member of the board of supervisors, another must be an elected member of a city council of a city within Marin County, and another must be a member of the general public.
- Three directors representing Sonoma County, appointed by the board of supervisors. One of the directors may be an elected member of the board of supervisors, and another of the directors must be an elected member of a city council of a city within Sonoma County.
- Nine directors, representing the City and County of San Francisco, eight of whom must be appointed by the board of supervisors, and one of whom must be appointed by the mayor. Four of the directors shall be elected members of the board of supervisors.
- Golden Gate Bridge Seismic Safety. The Golden Gate Bridge spans the Golden Gate Strait linking the City of San Francisco and the counties to the north. Serving up to 40 million vehicles a year, it serves a vital transportation link for the San Francisco Bay Area. The Loma Prieta Earthquake was a magnitude of 7.1 on October 17, 1989. According to the District, “Immediately following the Loma Prieta quake, the District engaged a team of consultants to conduct a vulnerability study. The conclusion of the study was that under a Richter magnitude 7.0 or greater earthquake with an epicenter near the Bridge, it would experience severe damage that could close this important transportation link for an extended period. If a Richter magnitude 8.0 or greater earthquake centered near the Bridge, there would be a substantial risk of impending collapse of the San Francisco and Marin Approach Viaducts and the Fort Point Arch, and extensive damage to the remaining Bridge structures, including the Main Suspension Bridge. It must be noted that, as of July 2008, with the completion of the second phase of construction, the seismic retrofit of the Golden Gate Bridge is far enough along that the Bridge no longer faces the potential for collapse and until the entire retrofit is completed, the risk of significant damage to the Main Suspension Bridge remains.
“After determining that retrofitting the Bridge would be more cost-effective than replacing it, in 1992, the District hired engineering consultants to develop seismic retrofit design criteria. As part of this task, the site-specific design ground motions associated with different magnitudes of earthquakes and expected performance levels were defined as the basis for the Bridge retrofit design. The site-specific, moderate earthquake was defined as one having a 10 percent chance of being exceeded in a 50-year period or having an acceleration of 0.46g. The site-specific, maximum credible earthquake was defined as one having a return period of 1,000 years or having an acceleration of 0.65g, which is equivalent to the 1906 San Francisco earthquake of a magnitude 8.3 on the Richter scale.”
In 1996, three construction phases were established as follows:
- Phase 1: Retrofit the Marin (north) Approach Viaduct, which took place from 1997-2001, cost $71 million.
- Phase 2: Retrofit the San Francisco (south) Approach Viaduct, San Francisco (south) Anchorage Housing, Fort Point Arch, and Pylons S1 and S2, which took place from 2001-2008, cost $189 million.
- Phase 3A and 3B: Retrofit the Main Suspension Bridge and Marin (north) Anchorage Housing. Phase 3A took place from 2008-2014 and cost $125 million. The final phase includes upgrades to the 4,200-foot main span, two 1,125-foot side spans, the two 746-foot towers, and repainting of the South Tower. Construction Contract #1 for the final phase was awarded in December 2025 and is planned to be undertaken from 2026-2031. The budget for Contract #1 is $1.012 billion funded through a combination of:
- $396 million (39%) – Federal Bridge Investment Program (BIP).
- $200 million (20%) – Federal Highway Bridge Program (HBP) (via Caltrans).
- $416 million (41%) – Local Bridge tolls.
Following completion of Contract #1 in 2031, the District plans to award Contract #2 (planned 2031-2036) for seismic retrofit of the Bridge’s main center span, which is nearly twice the length of the two side spans. The estimated cost for Construction Contract #2 is approximately $1 billion.
- Financial Constraints. According to the District, “The District is facing several pressures, creating an immediate need for long-term financing. The commitment of $416 million of tolls to Contract 1 will significantly reduce our reserves. Furthermore, downtown San Francisco is still recovering from the pandemic, which equates to less toll dollars. Weekday morning commute traffic remains approximately 25 percent below pre-pandemic levels, reducing toll revenues – the District’s primary funding source -for Bridge operations, maintenance, and transit service.
“Additionally, the District’s bus drivers are in a standalone pension plan known as the Golden Gate Transit Amalgamated Retirement Plan (GGTARP). According to GGTARP’s latest actuarial valuation report, GGTARP’s funded ratio is 42.9 percent. The District will need the financial flexibility to provide additional funding to GGTARP. The ability to take on long-term debt for seismically retrofitting the Bridge would provide the District with the capacity to use a portion of its reserves to provide additional funding to GGTARP.” - Conduit Financing. Some state and local agencies can serve as conduit bond issuers. For example, the California Infrastructure and Economic Development Bank (IBank) issues bonds on behalf of a borrower and then lends those proceeds to that borrower. The bonds are special, limited obligations payable by the borrower’s payments with IBank serving as the conduit issuer.
- Policy Consideration. According to the District, its ability to issue debt is significantly more restrictive than that of comparable public agencies. In order for the District to issue bonds, it must seek a two-thirds majority vote from all of its voters in 6 counties of Del Norte, Mendocino, Napa, Sonoma, Marin, and San Francisco (SHC § 27226). Existing law prohibits the District from issuing general obligation bonds, revenue bonds, “or any other form of long-term indebtedness” except for the necessity to finance its interim system of buses and ferries or the necessity to finance capital improvements or modifications relating to seismic safety of the bridge.
The District is seeking legislation to authorize a streamlined form of borrowing that does not require full bond issuance authority and would allow the District to partner with conduit revenue bond issuers to finance the seismic improvements. Under this structure, the conduit issuer would issue bonds and enter into a loan agreement with the District, through which the proceeds of the bonds would be provided to the District. The District would make loan payments to the conduit issuer, and those funds would then be applied to repay the bonds. However, given its ability to issue debt under SHC § 27226, and as the District would not actually issue the bonds itself, the District may already have the authority to participate in such conduit financings. Given the information provided above, the Committee may wish to consider if the additional clarity that this bill would provide regarding the District’s ability to incur debt is needed.
- Committee Amendment. The Author has asked the Committee to make the following amendment to this bill:
SHC 27556(b). Notwithstanding subdivision (a) or any provision of Part 3 (commencing with Section 27000) of Division 16, the district may accept contributions or loans from the United States or this state or any of its political subdivisions, or any department, instrumentality, agency, or authority of either thereof, for the purpose of financing capital improvements or modifications relating to seismic safety of the bridge. The district may authorize the acceptance of those contributions or loans by resolution, which shall specify the purposes for which the contribution or loan is being accepted, the maximum principal amount of the loan, the maximum duration of the loan, and the maximum rate of interest to be payable on the loan, as applicable. The district may do any and all things necessary in order to avail itself of that aid, assistance, and cooperation under any federal or state legislation now or hereafter enacted, including pledging toll revenues for the repayment of those loans and entering into contracts ancillary to those loans. Any evidence of indebtedness issued under this section shall constitute a negotiable instrument. This subdivision is a complete, additional, and alternative method for the district to authorize and accept a contribution or loan from an entity for the purposes specified herein and shall be regarded as supplemental and additional to all other powers conferred to the district by law.
- Arguments in Support. According to the District, the sponsor of this bill, “In December 2025 the Bridge District awarded Construction Contract 1 to retrofit the Bridge’s north and south towers and side spans. Contract 1 is anticipated to employ on-site over 220 ironworkers, operating engineers, carpenters, and laborers as well as over 70 painters. Following completion of Contract 1 in 2031, the Bridge District plans to award Contract 2 for seismic retrofit of the Bridge’s main center span, which is nearly twice the length of the two side spans.
“However, in order to address the needs of funding Contract 2 and other operating pressures, modernizing the Bridge District’s authority to incur debt would allow the Bridge District to leverage toll revenues to efficiently manage cash flow needs. This authority is not new, and has been available to other cities, counties, and special districts for decades. The content of SB 607 is based on existing laws that allow for public agency debt financing.
“While existing law already provides cities, counties, and special districts with broad authority to use various forms of debt financing, the Bridge District’s authorizing statute restricts the use of debt financing. SB 607 would afford the Bridge District the authority to authorize a streamlined form of borrowing that does not require full bond issuance authority. This would allow the Bridge District to partner with a conduit revenue bond issuer to finance seismic improvements.
“Senate Bill 607 will provide the Bridge District with the financial tools already available to other special districts and allow for the efficient use of resources to protect and maintain the Golden Gate Bridge for future generations.”
Arguments in Opposition. None on file.
Double-Referral. This bill is double referred to the Transportation Committee, where it passed on 16-0 vote on June 22, 2026.
REGISTERED SUPPORT / OPPOSITION:
Support
Golden Gate Bridge, Highway and Transportation District [SPONSOR]
International Union of Operating Engineers, California-Nevada Conference
Opposition
None on file
Analysis Prepared by: Jimmy MacDonald / L. GOV. / (916) 319-3958
Date of Hearing: June 22, 2026
ASSEMBLY COMMITTEE ON TRANSPORTATION
Lori D. Wilson, Chair
SBPCA Bill Id:SB 607
Author:(Wiener) – As Amended Ver:June 8, 2026
SENATE VOTE: 37-0
SUBJECT: Golden Gate Bridge, Highway and Transportation District: contributions and loans
SUMMARY: Authorizes the Golden Gate Bridge, Highway and Transportation District (District) to accept a contribution or loan from federal government or the state to finance capital improvements related to seismic safety of the Golden Gate Bridge (GGB). Specifically, this bill:
- Authorizes the District to accept a contribution or loan from the United States, the state or any of its political subdivisions, or any department, instrumentality, agency, or authority of either, for the purpose of financing capital improvements or modifications relating to seismic safety of the GGB.
- Authorizes the District to accept a contribution or loan by resolution, which must specify the purposes of the contribution or loan, the maximum principal amount, and the maximum rate of interest payable on the loan.
- Authorizes the District to pledge toll revenues for the repayment of a loan and to enter into contracts ancillary to a loan.
- Clarifies that this bill is an additional and alternative method for the District to authorize and accept a contribution or loan.
EXISTING LAW:
- Authorizes the formation of a bridge and highway district, prescribing related procedural and governance requirements, powers and duties, taxation, bonding, toll and financing authorities (Streets and Highways Code (SHC) §27000, et seq.).
- Authorizes a district to sell or issue bonds, if approved by a 2/3 vote threshold in a special election, and imposes related procedural and due process requirements.
- Authorizes the use of toll revenues to pay any indebtedness or lien against a district.
- Establishes the District as a special district to operate and maintain the GGB and two public transit systems (Golden Gate Transit and Golden Gate Ferry) connecting the counties of Marin, Sonoma, San Francisco, and Contra Costa (SHC §27500).
- Prohibits the District from issuing general obligation bonds, revenue bonds, or any other form of long-term indebtedness except to finance its interim system of buses and ferries or to finance capital improvements or modifications relating to seismic safety of the bridge (SHC §27556).
- Prescribes the composition and make-up of the District’s 17 board of directors as follows:
- One director, representing Del Norte County, one director, representing Mendocino County, and one director, representing Napa County, appointed by the board of supervisors of the respective represented county.
- Four directors, representing Marin County, appointed by the board of supervisors. One of the directors must be an elected member of the board of supervisors, another must be an elected member of a city council of a city within Marin County and another must be a member of the general public.
- Three directors, representing Sonoma County, appointed by the board of supervisors. One of the directors may be an elected member of the board of supervisors, and another of the directors must be an elected member of a city council of a city within Sonoma County.
- Nine directors, representing the City and County of San Francisco, eight of whom shall be appointed by the board of supervisors, and one of whom shall be appointed by the mayor; four of the directors shall be elected members of the board of supervisors (SHC §27510).
FISCAL EFFECT: Unknown
COMMENTS: According to the author, “The Golden Gate Bridge is a critical, iconic piece of infrastructure and symbol of our state. The bridge - constructed in a period of great adversity - was an engineering marvel of its time, and it continues to serve millions of people every year - whether they drive, ride the bus, walk, or bike on the bridge. By modernizing the Golden Gate Bridge District’s ability to enter into long-term loan agreements, SB 607 will help ensure the Golden Gate Bridge remains safe, seismically resilient, and operational for generations to come.”
The development and construction of the GGB has a long and storied history. Motivated by the immense popularity of the automobile, ferry congestion and unreliability, stunted economic development in San Francisco due to the lack of a fixed crossing, San Francisco City Engineer Michael O'Shaughnessy, Secretary to the Mayor Edward Rainey, and engineer Joseph B. Strauss believed a special district was needed to oversee financing, design, and construction so that all affected counties could be heard and represented. In 1923, the Bridging the Golden Gate Association was formed to advocate and campaign for the construction of a bridge. That same year, Governor Friend William Richardson signed a bill by Assemblyman Frank Coombs creating the District.
Golden Gate Suspension Bridge Seismic Retrofit Project. The District’s ongoing seismic safety project seeks to ensure the GGB can withstand an 8.3 magnitude earthquake. This bill authorizes the District to accept a contribution or loan to complete the final phase of its project—upgrades to the 4,200 foot center span are estimated to cost approximately $1 billion. The District financed the current phase (also about $1 billion) of the project with a mix of state and federal funding and bridge tolls to upgrade the two 1,125-foot side spans and two 746-foot towers, and repaint the south tower.
The District is currently evaluating all viable funding options for the final phase and states that it “…is facing several pressures, creating an immediate need for long-term financing. The commitment of $416 million of tolls to [the current project phase] will significantly reduce our reserves. Furthermore, downtown San Francisco is still recovering from the pandemic, which equates to less toll dollars. Weekday morning commute traffic remains approximately 25 percent below pre-pandemic levels, reducing toll revenues – the District’s primary funding source for Bridge operations, maintenance, and transit service.”
The District’s bus driver pension obligations are also severely underfunded. The current retirement plan’s funded ratio of 42.9% means that it has only $0.43 in assets for every $1 retirement benefits. As stated by the District: “The District will need the financial flexibility to provide additional funding to [the above retirement plan]. The ability to take on long-term debt for seismically retrofitting the Bridge would provide the District with the capacity to use a portion of its reserves to provide additional funding to [the retirement plan].
District seeks authority it may already have. The two primary objectives of this bill are to: 1) clarify that the District can seek a loan to finance its seismic safety project and 2) exempt the District from existing law governing bridge and highway districts.
Existing law authorizes the District to issue bonds and “any other form of long-term indebtedness” for financing capital improvements related to seismic safety of the GGB and to finance its bus and ferry services. The District intends to exercise this authority to finance the final phase of its seismic safety project. The District intends to use conduit loan financing, which involves a government entity issuing tax-exempt municipal bonds and then lending the proceeds to a public or private entity which pays back the loan. The public agencies issuing the bonds are not responsible for paying the bond investors back; rather, they serve as a conduit connecting borrowers to investors. In this case, the District’s toll revenues would guarantee repayment of the loan. The California Infrastructure and Economic Development Bank routinely provides conduit financing.
The primary purpose of #2 is to streamline the process to exercise this borrowing authority. Namely, existing law, similar to constitutional requirements that apply to most public entities, requires all bridge and highway districts to seek 2/3 voter approval when directly issuing general obligation bonds. However, as a special district, the District would have to seek such approval in the six counties that comprise the District. While the District itself would not issue bonds in a conduit financing scheme, it asserts there is sufficient legal ambiguity to warrant a relatively broad exemption from this and other potentially applicable requirements.
Many state and local public agencies use conduit loan financing and the District asserts that the authority in this bill is similar to borrowing authorization available to certain transit districts.
This bill is dual-referred to the Assembly Local Government Committee.
Writing in support, the District states that: “While existing law already provides cities, counties, and special districts with broad authority to use various forms of debt financing, the Bridge District’s authorizing statute restricts the use of debt financing. SB 607 would afford the Bridge District the authority to authorize a streamlined form of borrowing that does not require full bond issuance authority. This would allow the Bridge District to partner with a conduit revenue bond issuer to finance seismic improvements.”
REGISTERED SUPPORT / OPPOSITION:
Support
Golden Gate Bridge, Highway, and Transportation District (sponsor)
International Union of Operating Engineers
Opposition
None on file
Analysis Prepared by: Dan Chia / TRANS. / (916) 319-2093
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 607 |
CONSENT
Bill No: SB 607
Author: Wiener (D)
Amended: 1/5/26
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 6-0, 4/23/25
AYES: Blakespear, Valladares, Dahle, Gonzalez, Menjivar, Padilla
NO VOTE RECORDED: Hurtado, Pérez
SENATE LOCAL GOVERNMENT COMMITTEE: 5-1, 4/30/25
AYES: Choi, Arreguín, Cabaldon, Seyarto, Wiener
NOES: Durazo
NO VOTE RECORDED: Laird
SENATE APPROPRIATIONS COMMITTEE: 4-0, 5/23/25
AYES: Caballero, Cabaldon, Grayson, Richardson
NO VOTE RECORDED: Seyarto, Dahle, Wahab
SENATE EDUCATION COMMITTEE: 7-0, 1/14/26
AYES: Pérez, Ochoa Bogh, Cabaldon, Choi, Cortese, Gonzalez, Reyes
SUBJECT: University of California: California Institutes for Science and Innovation
SOURCE: Author
DIGEST:
This bill explicitly authorizes artificial intelligence (AI) as an additional concentration area that may be covered by the existing California Institutes for Science and Innovation established within the University of California (UC).
ANALYSIS:
Existing law:
- Authorizes the UC Regents to establish four California Institutes for Science and Innovation at separate campuses of the UC for the purpose of combining technological and scientific research training and educating future scientists and technological leaders.
- Requires that each institute be created through a competitive application process conducted by a panel selected by the Governor and administered by the UC.
- Specifies that each institute develop programs in cooperation with the private sector and with California’s other public and independent universities.
- States that the concentration of each institute may include, but is not limited to, any of the following:
- Medicine.
- Bioengineering.
- Telecommunications and information systems.
- Energy resources.
- Space.
- Agricultural technology.
- Makes the state’s share of funding for operating and facilities costs for each institute subject to appropriation in the annual Budget Act. (Education Code § 92900)
This bill explicitly adds AI to the list of concentration areas that may be covered by the existing California Institutes for Science and Innovation established within the UC.
Comments
Need for this bill. According to the author, “SB 607 adds Artificial Intelligence to the list of enumerated concentrations that the California Institutes of Science and Innovation may focus on. As this technology continues to play a major role in our state’s economy, it is important that existing resources are leveraged to ensure California’s position as a leader in safe and responsible AI. Since 2001, when the University of California was given funding to establish four California Institutes for Science and Innovation in order to help bridge the gap between research and business, the technology landscape has greatly shifted. Existing law references six areas in which the institutes may concentrate, adding AI best positions California to continue to lead on this technology.”
California Institutes for Science and Innovation. AB 2883 (Villaraigosa, Chapter 79, Statutes of 2000) authorized the UC to establish three research institutes to be located on separate UC campuses, partially funded with state funds. A fourth institute was authorized the following year. Existing law allows each institute to focus on a range of concentration areas, including medicine, bioengineering, telecommunications and information systems, energy resources, space, and agricultural technology, but does not limit institutes to these areas, and they may pursue other topics without additional legislation. These multidisciplinary research centers are structured in partnership with industry to promote business growth in the state, serve as training grounds for student researchers, and future business leaders. All four institutes utilize the research capabilities of multiple UC campuses. The institutes include the Center for Information Technology Research in the Interest of Society, the California Nanosystems Institute, the California Institute for Telecommunications and Information Technology, and the California Institute for Quantitative Biosciences.
Artificial Intelligence. There is growing interest within the Legislature in expanding research on AI to better understand its impacts and to help inform the development of policy. According to the 2025 report, The California Report on Frontier AI Policy, AI encompasses a broad range of technologies that aim to replace or supplement human cognitive capabilities. California is home to many of the leading AI companies and research institutions. California has both the capability and responsibility to help ensure these powerful technologies remain safe so that their benefits to society can be realized. AI, as an area of concentration, aligns with the technology emphasis of the other concentration areas outlined in existing law. This bill aims to support research capacity in AI technology by highlighting it as a potential area of study within these established institutes.
FISCAL EFFECT: Appropriation: No Fiscal Com.: No Local: No
SUPPORT: (Verified 1/15/26)
None received
OPPOSITION: (Verified 1/15/26)
None received
Prepared by: Olgalilia Ramirez / ED. / (916) 651-4105
1/15/26 15:57:38
**** END ****
SENATE COMMITTEE ON EDUCATION
Senator Sasha Renée Pérez, Chair
2025 - 2026 Regular
Bill No: Hearing Date: January 14, 2026
Author: | |||
Version: | January 5, 2026 | ||
Urgency: | Fiscal: | No | |
Consultant: | |||
Subject: University of
SUMMARY
This bill explicitly authorizes artificial intelligence (AI) as an additional concentration area that may be covered by the existing California Institutes for Science and Innovation established within the University of California (UC).
BACKGROUND
Existing law:
- Authorizes the UC Regents to establish 4 California Institutes for Science and Innovation at separate campuses of the UC for the purpose of combining technological and scientific research training and educating future scientists and technological leaders.
- Requires that each institute be created through a competitive application process conducted by a panel selected by the Governor and administered by the UC.
- Specifies that each institute develop programs in cooperation with the private sector and with California’s other public and independent universities.
- States that the concentration of each institute may include, but is not limited to, any of the following:
- Medicine.
- Bioengineering.
- Telecommunications and information systems.
- Energy resources.
- Space.
- Agricultural technology.
- Makes the state’s share of funding for operating and facilities costs for each institute subject to appropriation in the annual Budget Act. (Education Code § 92900)
ANALYSIS
- This bill explicitly adds AI to the list of concentration areas that may be covered by the existing California Institutes for Science and Innovation established within the UC.
STAFF COMMENTS
- Need for the bill. According to the author, “SB 607 adds Artificial Intelligence to the list of enumerated concentrations that the California Institutes of Science and Innovation may focus on. As this technology continues to play a major role in our state’s economy, it is important that existing resources are leveraged to ensure California’s position as a leader in safe and responsible AI. Since 2001, when the University of California was given funding to establish four California Institutes for Science and Innovation in order to help bridge the gap between research and business, the technology landscape has greatly shifted. Existing law references six areas in which the institutes may concentrate, adding AI best positions California to continue to lead on this technology.”
- California Institutes for Science and Innovation. AB 2883 (Villaraigosa, Chapter 79, Statutes of 2000) authorized the UC to establish three research institutes to be located on separate UC campuses, partially funded with state funds. A fourth institute was authorized the following year. Existing law allows each institute to focus on a range of concentration areas, including medicine, bioengineering, telecommunications and information systems, energy resources, space, and agricultural technology, but does not limit institutes to these areas, and they may pursue other topics without additional legislation. These multidisciplinary research centers are structured in partnership with industry to promote business growth in the state, serve as training grounds for student researchers, and future business leaders. All four institutes utilize the research capabilities of multiple UC campuses. The institutes include the Center for Information Technology Research in the Interest of Society, the California Nanosystems Institute, the California Institute for Telecommunications and Information Technology, and the California Institute for Quantitative Biosciences.
- Artificial Intelligence. There is growing interest within the Legislature in expanding research on AI to better understand its impacts and to help inform the development of policy. According to the 2025 report, The California Report on Frontier AI Policy, AI encompasses a broad range of technologies that aim to replace or supplement human cognitive capabilities. California is home to many of the leading AI companies and research institutions. California has both the capability and responsibility to help ensure these powerful technologies remain safe so that their benefits to society can be realized. AI, as an area of concentration, aligns with the technology emphasis of the other concentration areas outlined in existing law. This bill aims to support research capacity in AI technology by highlighting it as a potential area of study within these established institutes.
SUPPORT
None received
OPPOSITION
None received
-- END --
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 607 |
THIRD READING
Bill No: SB 607
Author: Wiener (D), et al.
Amended: 5/28/25
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 6-0, 4/23/25
AYES: Blakespear, Valladares, Dahle, Gonzalez, Menjivar, Padilla
NO VOTE RECORDED: Hurtado, Pérez
SENATE LOCAL GOVERNMENT COMMITTEE: 5-1, 4/30/25
AYES: Choi, Arreguín, Cabaldon, Seyarto, Wiener
NOES: Durazo
NO VOTE RECORDED: Laird
SENATE APPROPRIATIONS COMMITTEE: 4-0, 5/23/25
AYES: Caballero, Cabaldon, Grayson, Richardson
NO VOTE RECORDED: Seyarto, Dahle, Wahab
SUBJECT: California Environmental Quality Act:Infrastructure Projects
SOURCE: Housing Action Coalition
Bay Area Council
Prosperity California
DIGEST:
This bill states the intent of the Legislature to make changes to the California Environmental Quality Act (CEQA) to ensure the state meets its infrastructure needs and is more affordable for all Californians, as specified, without compromising environmental protections. This bill further states that it is the intent of the Legislature that no revisions be made to CEQA for the purposes of the Delta Conveyance Project.
ANALYSIS:
- Under CEQA, a lead agency determines whether a project is exempt from CEQA, or if it must do an initial study to determine if a project will have significant effects on the environment. If a project has no effect on the environment or effects that can be mitigated, the lead agency prepares a negative declaration (ND) or mitigated ND (MND). If the project will have significant impacts, the lead agency prepares an environmental impact report (EIR) to evaluate and propose mitigation measures for any effects on the environment, including impacts or likely impacts to land, air, water, minerals, flora, fauna, ambient noise, and historic or aesthetic significance. (Public Resources Code (PRC) §§21000 et seq.)
- Includes, under the CEQA Guidelines (Title 14, Division 6, Chapter 3 of the California Code of Regulations) categorical exemptions for residential projects, including Section 15303 for new construction or conversion of small structures and Section 15332 for larger, infill development projects, as specified.
- Exempts from CEQA multi-family residential and mixed-use housing projects on infill sites within cities and unincorporated areas that are within the boundaries of an urbanized area or urban cluster. (PRC §21159.25)
- Exempts from CEQA specified residential housing projects which meet detailed criteria established to ensure the project does not have a significant effect on the environment, including:
- Affordable agricultural housing projects not more than 45 units within a city, or 20 units within an agricultural zone, on a site not more than five acres in size;
- Urban affordable housing projects not more than 100 units on a site not more than five acres in size; and,
- Urban infill housing projects not more than 100 units on a site not more than four acres in size which is within one-half mile of a major transit stop. (PRC §21159.20-21159.24)
- Requires metropolitan planning organizations (MPOs) to include a sustainable communities strategy (SCS), as defined, in their regional transportation plans, or an alternative planning strategy (APS), for the purpose of reducing greenhouse gas (GHG) emissions, aligns planning for transportation and housing, and creates specified incentives for the implementation of the strategies, including CEQA exemption or abbreviated review for residential or mixed-use residential "transit priority projects" if the project is consistent with the use designation, density, building intensity, and applicable policies specified for the project area in either an approved SCS or APS. (PRC §21155.1)
- Exempts from CEQA residential, mixed-use, and "employment center" projects, as defined, located within "transit priority areas," as defined, if the project is consistent with an adopted specific plan and specified elements of an SCS or APS. (PRC §21155.4)
- Establishes CEQA judicial streamlining provisions for a broad swath of infrastructure projects, including energy, transportation, water, and semiconductor projects in SB 149 (Caballero, Chapter 60, Statutes of 2023). Projects must meet certain environmental and labor criteria to be eligible for this certification. The streamlining certification ends January 1, 2033.
- Establishes the AB 205 (Committee on Budget, Chapter 61, Statutes of 2022) “Opt-in” permitting process at the CEC for certain clean energy projects, including certain transmission facilities. With this certification, environmental review must be completed by the CEC in 270 days, and actions or proceedings related to the certification of an environmental impact report need to be resolved within 270 days to the extent feasible. (Public Resources Code §25545 et seq.)
This bill:
- States that it is the intent of the Legislature to make necessary statutory changes to CEQA to ensure the state meets its infrastructure needs and is more affordable for all Californians, specifically to:
- Expedite projects such as those that provide housing, clean energy jobs, and critical transportation;
- Make communities more wildfire safe;
- Expedite the ability of local governments to provide clean drinking water; and
- Ensure critical projects are not delayed or impeded by the numerous outdated requirements in CEQA without compromising environmental protections.
- States that it is the intent of the Legislature that no revisions be made to CEQA for the purposes of the Delta Conveyance Project.
Background
- The A, B, C’s of CEQA. CEQA is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment. CEQA is enforced by civil lawsuits that can challenge any project’s environmental review.
- California Housing Crisis. California’s housing crisis is a half-century in the making.[1] After decades of underproduction, supply is far behind need and housing and rental costs are soaring. As a result, millions of Californians must make hard decisions about paying for housing at the expense of food, health care, child care, and transportation, directly impacting the quality of life in the state. [2] One in three households in the state doesn’t earn enough money to meet their basic needs. [3] In 2024, over 187,000 Californians experienced homelessness on a given night.[4]
To meet this housing need, HCD determined that California must plan for more than 2.5 million new homes, and no less than one million of those homes must be affordable to lower-income households, in the 6th Regional Housing Needs Allocation (RHNA) cycle. By contrast, housing production in the past decade has been under 100,000 units per year – including less than 10,000 units of affordable housing per year.[5]
- Existing CEQA Exemptions for Housing. There are numerous existing CEQA exemptions in statute and in the CEQA guidelines for residential projects. There are now at least 17 distinct CEQA exemptions for housing and homeless shelter projects, and the CEQA Guidelines have included categorical exemptions for housing projects for decades, allowing projects with no significant environmental impacts to proceed to approval without environmental review.
A few existing CEQA exemptions are specific to projects with an affordable housing fraction, the rest are available to affordable and market-rate projects alike. Each exemption includes a range of conditions, including requirements for prior planning-level review, as well as limitations on the location and characteristics of the site. These conditions are intended to guard against the approval of projects with significant environmental impacts that go undisclosed and unmitigated – endangering workers, residents and the greater environment. More recently, bills such as SB 423 (Wiener) have established ministerial approval for certain housing projects, where local discretionary review, including CEQA, is replaced with construction labor requirements and exclusion of specified sensitive sites.
- California’s Energy Goals and Needs. SB 100 (De León, Chapter 312, Statutes of 2018), also known as the “100% Clean Energy Act of 2018,” established a landmark policy that renewable and zero-carbon resources supply 100% of retail sales and electricity procured to serve all state agencies by 2045 (the 100% Clean Energy Policy).[6] A study conducted by the Clean Air Task Force and the Environmental Defense Fund concluded that, at a minimum, transmission capacity must double by 2045 to accommodate new renewables and ensure grid reliability. To achieve procurement targets for SB 100, the California Public Utilities Commission, adopted an Integrated Resource Plan (IRP)[7] planning process that runs on a two-year cycle. In February 2024, the CPUC adopted a decision in its integrated resource planning that meets a statewide 25 million metric ton (MMT) greenhouse gas (GHG) target for the electric sector by 2035.[8] The decision represents the most aggressive end of the range identified by CARB, and has identified 56,000 megawatts of clean new resources are needed by 2035.
- Energy Streamlining Measures. In recognition of the urgent need to deploy transmission and energy infrastructure to meet California’s energy demand and clean energy goals, the Legislature has enacted several measures in recent years to streamline environmental review and permitting for transmission projects.
In 2022, the Legislature passed AB 205 (Committee on Budget, Chapter 21, Statutes of 2022), which, among many other elements, authorized certain energy projects, including electric transmission lines between certain non-fossil fuel energy generation facilities, to become certified leadership projects under the Jobs and Economic Improvement Through Environmental Leadership Act of 2021 through a certification process through the CEC. With this certification, actions or proceedings related to the certification of an environmental impact report need to be resolved within 270 days to the extent feasible. AB 205 also authorized the CEC to implement a new optional program (opt-in) that authorizes the CEC to accept applications seeking certification of certain non-fossil-fueled energy generating facilities, energy storage facilities, transmission facilities connected to these generation facilities, and other related facilities. The emergency regulations set forth the process for submitting opt-in applications, reviewing applications, performing outreach, and considering whether to issue or deny a certification.
- CEQA streamlining for infrastructure projects. The Legislature has developed streamlining measures to speed CEQA lawsuits brought against specified projects through the courts. Judicial streamlining requires that a CEQA lawsuit be heard in 270 days, including all appeals, as feasible. Administrative streamlining requires projects to prepare the administrative record, the comprehensive document at the heart of a CEQA case, at the same time as the environmental review documents are prepared. Preparing these documents concurrently, instead of sequentially, saves time if there is a lawsuit. These streamlining measures shorten what is potentially the lengthiest portion of the CEQA process—litigation—while retaining the full environmental review and public engagement offered under CEQA.
In 2023, The Legislature expanded existing CEQA streamlining provisions for a large swatch of infrastructure projects, including clean energy, transportation, and water infrastructure projects (SB 149, Caballero, Chapter 60, Statutes of 2023) projects for renewable or other environmental leadership projects.
Comments
- Stating intent. Previous versions of SB 607 made numerous substantive changes to CEQA, including changing the criteria and legal standing to use a ND or MND vs an EIR establishing a new, limited environmental review process for projects that fail to meet the criteria for CEQA exemptions by one condition; limiting the information that can be included in the administrative record; exempting rezoning from CEQA if the rezone is consistent with a housing element; tasking the Office of Land Use and Climate Innovation with developing thresholds of significance for some environmental impacts; and making significant changes to the requirements and application of the Class 32 “infill” categorical exemption, among other changes.
The amendments made in the Senate Appropriations Committee stripped those provisions from this bill and added intent language, described above, regarding further intended changes to CEQA. The intent language also states that at least some of these revisions to CEQA will proceed through the budget process, as opposed to within SB 607 itself. Currently, SB 607 makes no change to law. - The Delta Conveyance Project. In concert with the 2025-2026 May Revision, Governor Newsom released trailer bill language calling for streamlining for the Delta Conveyance Project (DCP). This proposal would expedite judicial review for DCP, prohibit courts from staying the project under most circumstances, limit what information could be considered in any lawsuit against the DCP under CEQA, make it more difficult for water rights holders to maintain a protest. The May Revision also makes water quality control plans, including the one for the delta, exempt from CEQA except in certain conditions.
As part of the 2023 Budget, Governor Newsom had proposed to give the DCP 270 day judicial CEQA streamlining, a proposal which was rejected by the Legislature. The current proposal includes similar streamlining provisions and much more.
FISCAL EFFECT: Appropriation: No Fiscal Com.: No Local: No
Senate Appropriations committee states that there are “No state costs” for the bill.
SUPPORT: (Verified 5/27/25)
Bay Area Council (co-source)
Housing Action Coalition (co-source)
Prosperity California (co-source)
AARP
Abundant Housing LA
American Council of Engineering Companies of California
American Council of Engineering Companies, California
American Planning Association, California Chapter
Association of Environmental Professionals
Board of Supervisors County of Madera
CA Assn of Winegrape Growers
California Apartment Association
California Big City Mayors Coalition
California Building Industry Association
California Building Industry Association
California Business Properties Association
California Chamber of Commerce
California Downtown Association
California State Association of Counties
California Yimby
Chamber of Progress
Circulate San Diego
County of Sacramento
East Bay Yimby
Fieldstead and Company, INC.
Greater Conejo Valley Chamber of Commerce
Grow the Richmond
Inner City Law Center
Institute for Responsive Government Action
Leadingage California
League of California Cities
League of Women Voters of California
Mayor Matt Mahan, City of San Jose
Mountain View Yimby
Napa-solano for Everyone
Northern Neighbors
Peninsula for Everyone
Redlands Yimby
Rural County Representatives of California
San Bernardino County
Santa Cruz Yimby
Santa Rosa Yimby
Sf Yimby
South Bay Yimby
South Pasadena Residents for Responsible Growth
Spur
Streets for All
The Two Hundred
Truckee Tahoe Workforce Housing Agency
Ventura County Yimby
Yimby Action
Yimby LA
Yimby Slo
OPPOSITION: (Verified 5/23/25)
1000 Friends Protecting Historic Benicia
350 Bay Area Action
350 Conejo / San Fernando Valley
350 South Bay Los Angeles
350 Southland Legislative Alliance
Advocates for the Environment
Alta Peak Chapter, California Native Plant Society
American River Trees
Animal Welfare Institute
Arroyos & Foothills Conservancy
Ban Sup (single Use Plastic)
Battle Creek Alliance
Biodiversity First!
Biofuelwatch
Brentwood Alliance of Canyons & Hillsides
California Chaparral Institute
California Cities for Local Control
California Coastal Protection Network
California Comminuties Against Toxics
California Enviromental Justice Alliance
California Environmental Justice Alliance Action
California Environmental Voters (formerly Clcv)
California Federation of Labor Unions, Afl-cio
California Native Plant Society
California Nurses for Environmental Health and Justice
California Preservation Foundation
California River Watch
California State Council of Laborers
California Wildlife Foundation/california Oaks
Californians for Alternatives to Toxics
Californians for Pesticide Reform
Calwild
Canyon Back Alliance
Catalysts for Local Control
Center for Biological Diversity
Center for Community Action & Environmental Justice
Center for Environmental Health
Center for Food Safety
Center for Race, Poverty, and the Environment
Center on Race, Poverty & the Environment
Citizens Committee to Complete the Refuge
Citizens for Los Angeles Wildlife
Citizens for the Preservation of Parks & Beaches
Citizens Preserving Venice
Clean Water Action
Cleanearth4kids.org
Cleveland National Forest Foundation
Climate Action California
Climate Equity Policy Center
Climate First: Replacing Oil & Gas
Coalition for a Beautiful Los Angeles
Coast Action Group
Coastal Corridor Alliance
Coastal Environmental Rights Foundation
Coastal San Pedro Neighborhood Council
Comite Civico Del Valle
Communities for a Better Environment
Community Environmental Advocates Foundation
Conservation Congress CA
D4ward
Defenders of Wildlife
Earthjustice
Ecologistics
Elfin Forest / Harmony Grove Town Council
Endangered Habitats League
Environmental Action Committee of West Marin
Environmental Center of San Diego
Environmental Defense Center
Escondido Creek Conservancy
Facts Families Advocating for Chemical and Toxics Safety
Forest Unlimited
Forests Forever
Friends Foundation International
Friends of Ballona Wetlands
Friends of Gualala River
Friends of Harbors, Beaches and Parks
Friends of Lafferty Park
Friends of Loma Alta Creek
Friends of Rose Canyon
Friends of the Dunes
Friends of the Eel River
Friends of the Inyo
Friends of the LA River
Friends of the River
Friends of the West Shore
Fullerton Heritage
Green Foothills
Greenfield Walking Group
Hills for Everyone
Hills2000_friends of the Hills
In Defense of Animals
Ks Connectivity
Landwatch - San Luis Obispo County
Landwatch Monterey County
Leadership Council for Justice and Accountability
Long Beach Alliance for Clean Energy
Long Beach Heritage
Los Angeles Audubon Society
Los Angeles Waterkeeper
Los Cerritos Wetlands Land Trust
Los Padres Forest Watch
Lynwood; City of
Madrone Audubon Society, Sonoma County
Marin Conservation League
Mission Street Neighbors
Morongo Basin Conservation Association
Mountain Area Preservation
Move LA
Natural Resources Defense Council
Neighborhood Coalition Sonoma County
New Livable California Dba Livable California
North County Watch
Northern Chumash Tribal Council
Owens Valley Committee
Palos Verdes/south Bay Audubon
Partnership for Policy Integrity
Paula Lane Action Network
Pesticide Action & Agroecology Network
Petaluma River Council
Physicians for Social Responsibility - Los Angeles
Physicians for Social Responsibility - San Francisco Bay Area Chapter
Planning and Conservation League
Poison Free Malibu
Preservation Action Council of San Jose
Preserve Calavera
Preserve Rural Sonoma County
Preserve the American River
Preserve Wild Santee
Protect Ballona Wetlands
Protect San Benito County
Queers X Climate
Race & Equity in All Planning Coalition
Raptors are the Solution
Respct - Residents for an Equitable San Pedro Community Today
River City Waterway Alliance
Rose Foundation for Communities and the Environment
Rural Canyons Conservation Fund
Russian Riverkeeper
Safe Routes Partnership
San Francisco Baykeeper
Santa Barbara Audubon Society
Santa Clara Valley Bird Alliance
Santa Cruz Climate Action Network
Santa Susana Mountain Park Association
Save Lafayette
Save Our Heritage Organization
Save the American River Association
Save the Park
Save the Sonoma Coast
Sc Wildlands
Sierra Club California
Sierra Nevada Alliance
Sierra Watch
So Cal 350 Climate Action
Socal 350 Climate Action
Solano County Orderly Growth Committee
Sonoma County Climate Activist Network
Sonoma Land Trust
Sonoma Mountain Preservation
South of Market Community Action Network
Southwest Wetlands Interpretive Association
State Alliance for Firesafe Road Regulations
State Alliance for Firesafe Road Regulations
State Building & Construction Trades Council of California
Sunflower Alliance
Tahoe Sierra Clean Air Coalition
The Big Wild
The River Otter Ecology Project
The River Project
The Urban Wildlands Group
Transition Sonoma Valley
Transportation Solutions Defense and Education Fund
Turtle Island Restoration Network
Union of Concerned Scientists
Unite Here Local 11
Urban Wildlife Research Project
We Advocate Through Environmental Review
West Berkeley Alliance for Clean Air and Safe Jobs
West County Rural Alliance
Wishtoyo Foundation
Prepared by: Brynn Cook / E.Q. / (916) 651-4108
5/28/25 17:34:44
**** END ****
California Department of Housing and Community Development, A Home for Every Californian: 2022 Statewide Housing Plan. March 2022, https://storymaps.arcgis.com/stories/94729ab1648d43b1811c1698a748c136 ↑
IBID. ↑
IBID. ↑
U.S. Department of Housing and Urban Development, Point in Time Counts. https://www.huduser.gov/portal/datasets/ahar/2023-ahar-part-1-pit-estimates-of-homelessness-in-the-us.html ↑
https://www.hcd.ca.gov/policy-research/housing-challenges.shtml ↑
Public Utilities Code §454.53 ↑
IRP provides the umbrella process by which the CPUC oversees long-term procurement for its regulated load-serving entities (electrical corporations, community choice aggregators, and electric service providers), which serve approximately 75% of the state. The intent of this process is to ensure system needs are being met by the sum actions of the many LSEs in that system. The IRP looks a decade or more into the future. ↑
Proposed Decision issued 2/15/2021 in IRP Proceeding, Rulemaking 20-05-003 ↑
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
SB 607 (Wiener) - California Environmental Quality Act: categorical exemptions: infill projects
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would make numerous changes to the California Environmental Quality Act (CEQA).
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on May 23, 2025
Fiscal Impact:
- No state costs.
Committee Amendments:
Committee amendments would delete contents and add intent language.
-- END --
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
SB 607 (Wiener) - California Environmental Quality Act: categorical exemptions: infill projects
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would make numerous changes to the California Environmental Quality Act (CEQA).
Fiscal Impact:
- LCI estimates one-time costs of about $1 million spread over the first two years and ongoing costs of $939,000 annually (General Fund) to update CEQA guidelines and add the mapping requirements of this bill into Site Check, among other things.
Background:
The California Environmental Quality Act. Enacted in 1970, the California Environmental Quality Act (CEQA) requires California’s state and local agencies to evaluate, disclose, and where feasible, mitigate the potential environmental effects of their actions before they approve projects. Statute establishes CEQA’s fundamental purposes to include informing government decision-makers and the public about potential environmental effects, identifying ways to avoid or significantly reduce environmental damage, preventing significant avoidable impacts by adopting feasible mitigation measures or alternatives, and publicly disclosing the rationale for approving projects with unavoidable significant impacts.
CEQA process. CEQA requires a lead agency to first determine whether an action constitutes a “project” under CEQA. A project is a discretionary activity that a public agency proposes to be carried out or approved that could have a foreseeable impact on the physical environment. If an action isn’t a project, or is non-discretionary (ministerial), CEQA does not apply.
ND/MND vs. EIR environmental review. Under CEQA, projects (unless they have a specific exemption) must undergo environmental analysis. This process starts with an initial study which determines what level of further environmental review is needed for a given project. If a project has no significant effects on the environment, or if those effects can be fully mitigated, the project can move forward with a negative declaration (ND) or mitigated negative declaration (MND). If the initial study finds that the project has potential significant effects on the environment, then a full EIR is required. An EIR provides thorough environmental review of a proposed project, analyzing the significant direct and indirect environmental impacts of a proposed project on water quality, transportation, air quality and greenhouse gas emissions, terrestrial and aquatic biological resources, surface and subsurface hydrology, land use and agricultural resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, and cultural resources, among other factors. The EIR also includes proposed mitigation measures for any significant effects that it identifies. It also requires a consideration of alternatives to the proposed project, and a consideration of cumulative and growth-inducing impacts.
Legal standing for EIR vs. ND/MND. CEQA documents, if challenged in court, are held to different standards of judicial review depending on what document is used. A lead agency’s determination to use an ND/MNDs or EIR is held to the “fair argument” standard, which means that if a “fair argument” can be made that a project may have a significant effect on the environment, an EIR shall be prepared even though there may be other substantial evidence that the project will not have a significant effect. Only if there are clearly no significant effects and no fair argument to be made that there are significant effects would an ND/MND be used (CEQA Guidelines § 15064(f)(1)).
CEQA Guidelines The CEQA Guidelines (Title 14, Division 6, Chapter 3 of the California Code of Regulations) are the regulations that govern implementation of CEQA. The CEQA Guidelines reflect both the requirements developed in legislation, as well as court decisions interpreting the statute and practical planning considerations. Among other things, the CEQA Guidelines explain how to determine whether an activity is subject to environmental review, what steps are involved in the environmental review process, and the required content of environmental documents. The CEQA guidelines also include numerous categorical exemptions, which are not included in statute, and are developed for projects that are unlikely to have significant impacts on the environment. LCI, formerly the Governor’s Office of Planning and Research (OPR), develops the guidelines and CNRA adopts them.
Administrative record. The administrative record is at the heart of CEQA lawsuits. The administrative record is the comprehensive document on which CEQA cases are argued. As such, it includes all the material that might be important to address questions and concerns that could arise when the judge considers a CEQA case. Relevant documents can include: studies, analyses, transcripts of meetings or proceedings, all environmental review documents, reports, and public comments related to the environmental review of the project. Internal staff emails about the project and staff notes are also included in the record of proceedings.
Because the entire CEQA case is argued off of the administrative record, it behooves the plaintiff/petitioner to include all documents and materials that could be relevant to making their case. As a result, the administrative record can be large, and preparing it takes months, sometimes extending beyond a year.
Exemptions. Some actions are exempt from CEQA’s requirements because they fall within one of numerous exemptions listed in statute or in the CEQA Guidelines developed by the Office of Planning and Research (recently renamed to the Office of Land Use and Climate Innovation, or “LCI”) that identify classes of projects that do not have a significant effect on the environment (categorical exemptions). For example, the “Class 32” categorical exemption applies to infill development projects that meet the following criteria:
- The project is consistent with the applicable general plan, as well as with applicable zoning designation and regulations;
- The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses;
- The project site has no value as habitat for endangered, rare, or threatened species;
- Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality; and
- The site can be adequately served by all required utilities and public services.
A categorical exemption still may not apply to a project if there are “unusual circumstances” or “cumulative impacts” that might cause a significant environmental impact.
Proposed Law:
This bill would make numerous changes to CEQA, including changing the criteria and legal standing to use ND/MND vs an EIR; establishing a new, limited environmental review process for projects that fail to meet the criteria for CEQA exemptions by one condition; limiting the information that can be included in the administrative record; exempting rezoning from CEQA if the rezone is consistent with a housing element; tasking LCI with developing thresholds of significance for some environmental impacts; and making significant changes to the requirements and application of the Class 32 “infill” categorical exemption, among other things. In particular, this bill would:
- Revise the definition of negative declaration to mean a written statement briefly describing the reasons the lead agency has determined, based upon substantial evidence in the record, that the proposed project will not have a significant effect on the environment, as specified.
- Require a negative declaration to be prepared for a proposed project if the lead agency determines, based upon substantial evidence, in light of the whole record before the agency that:
- The project will not have a significant effect on the environment, or
- When an initial study identifies potentially significant effects on the environment but revisions in the project plans would avoid or mitigate the effects, the project, as revised, will not have a significant effect on the environment.
- Revise the definition of mitigated negative declaration to mean that revisions would avoid or mitigate the effects on the environment, as determined by the lead agency based upon substantial evidence in the record, as specified, and that the lead agency has determined, based upon substantial evidence in the record, that the project, as revised, will not have a significant effect on the environment, as provided.
- Require an EIR to be prepared if the lead agency determines, based upon substantial evidence, in light of the whole record before the agency, that it is more likely than not that the project will have a significant effect on the environment.
- Require a lead agency to determine whether a project is more likely than not to have a significant effect on the environment based on substantial evidence in light of the whole record, and would require an EIR to be prepared if the lead agency determines that it is more likely than not that a project will have a significant effect on the environment, as specified.
- For the approval of a proposed project that would otherwise be exempt from CEQA pursuant to a statutory or categorical exemption adopted before January 1, 2026, but for a single condition, as defined, limit the application of CEQA to the effects upon the environment that are caused solely by that single condition. For these projects, only require the initial study or EIR to examine those effects that the lead agency determines, based upon substantial evidence in the record, are caused solely by the single condition that makes the proposed project ineligible for the exemption, as provided.
- Exclude certain projects from these provisions including distribution centers, oil and gas infrastructure, and projects located on natural and protected lands, among other things.
- Exempt from the requirements of CEQA, except as provided, a rezoning that implements the schedule of actions contained in an approved housing element.
- Because the bill would require a lead agency to determine the applicability of this exemption, the bill would impose a state-mandated local program.
- Require LCI, on or before July 1, 2026, to map the eligible urban infill sites within every urbanized area or urban cluster in the state, as provided.
- Require LCI, on or before July 1, 2026, to prepare, develop, and transmit to the agency for certification and adoption an amendment to the infill development project categorical exemption that establishes an alternative means of compliance with the requirements of that categorical exemption, as provided.
- Provide that specified regulations related to the significant effect exception to the use of a categorical exemption do not apply to an infill project that meets all conditions of the infill development project categorical exemption.
- For a proposed project that meets specified elements of the infill development project categorical exemption that is otherwise ineligible for the categorical exemption due to one or more conditions, as defined, limit the application of CEQA to the effects upon the environment that are caused solely by those conditions that make the project ineligible for the categorical exemption.
- Provide that these provisions do not apply to a project that includes a distribution center or oil and gas infrastructure.
- Except for a project that includes a distribution center or oil and gas infrastructure, exclude staff notes and electronic internal agency communications, including emails, that were not presented to the final decisionmaking body, from the record of proceedings, as provided.
- Require certain court orders to be subject to specified limitations for a determination of a public agency that a project is eligible for a statutory exemption or categorical exemption that is found to violate CEQA.
Related Legislation:
SB 149 (2023) granted lead agencies the right to prepare the record themselves (at their own cost), despite petitioner’s right to elect to prepare it to give the agency more control over the content of the record. In addition, SB 149 specifically provided that the record need not include internal agency communications that are subject to privileges contained in the Evidence Code or exemptions under the Public Records Act. As this policy was enacted only two years ago, the implications to changes in the administrative record are still being evaluated.
Staff Comments:
The California Constitution requires the state to reimburse local governments for the costs of new or expanded state mandated local programs. Because SB 607 imposes new duties on local governments, Legislative Counsel says it imposes a new state mandate. SB 607 disclaims the state’s responsibility for providing reimbursement by citing local governments’ authority to charge for the costs of implementing the bill’s provisions.
-- END --
SENATE COMMITTEE ON LOCAL GOVERNMENT
Senator María Elena Durazo, Chair
2025 - 2026 Regular
Bill No: | SB 607 | Hearing Date: | 4/30/25 |
Author: | Wiener | Fiscal: | Yes |
Version: | 3/24/25 | Consultant: | Favorini-Csorba |
California Environmental Quality Act: categorical exemptions: infill projects
Makes numerous changes to the California Environmental Quality Act.
Background
The California Constitution allows cities and counties to “make and enforce within its limits, all local, police, sanitary and other ordinances and regulations not in conflict with general laws.” It is from this fundamental power (commonly called the police power) that cities and counties derive their authority to regulate behavior to preserve the health, safety, and welfare of the public—including land use authority.
Every county and city must adopt a general plan with seven mandatory elements: land use, circulation, housing, conservation, open space, noise, and safety. General plans must also either include an eighth element on environmental justice, or incorporate environmental justice concerns throughout the other elements.
The general plan must be “internally consistent,” which means the various elements cannot have conflicting information or assumptions. Additionally, cities’ and counties’ major land use decisions—including zoning ordinances and development permitting—must be consistent with their general plans.
The California Environmental Quality Act. Enacted in 1970, the California Environmental Quality Act (CEQA) requires California’s state and local agencies to evaluate, disclose, and where feasible, mitigate the potential environmental effects of their actions before they approve projects. Statute establishes CEQA’s fundamental purposes to include informing government decision-makers and the public about potential environmental effects, identifying ways to avoid or significantly reduce environmental damage, preventing significant avoidable impacts by adopting feasible mitigation measures or alternatives, and publicly disclosing the rationale for approving projects with unavoidable significant impacts.
CEQA process. Since cities and counties exercise land use authority in their jurisdictions, they are often “lead agencies”—the state or local agency with the principal responsibility for carrying out or approving a project—for purposes of CEQA. CEQA requires a lead agency to first determine whether an action constitutes a “project” under CEQA. A project is a discretionary activity that a public agency proposes to be carried out or approved that could have a foreseeable impact on the physical environment. If an action isn’t a project, or is non-discretionary (ministerial), CEQA does not apply.
Exemptions. Some actions are exempt from CEQA’s requirements because they fall within one of numerous exemptions listed in statute or in the CEQA Guidelines developed by the Office of Planning and Research (recently renamed to the Office of Land Use and Climate Innovation, or “LCI”) that identify classes of projects that do not have a significant effect on the environment (categorical exemptions). For example, the “Class 32” categorical exemption applies to infill development projects that meet the following criteria:
- The project is consistent with the applicable general plan, as well as with applicable zoning designation and regulations;
- The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses;
- The project site has no value as habitat for endangered, rare, or threatened species;
- Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality; and
- The site can be adequately served by all required utilities and public services.
A categorical exemption still may not apply to a project if there are “unusual circumstances” or “cumulative impacts” that might cause a significant environmental impact.
CEQA review and the “fair argument” standard. If a project under CEQA isn’t exempt, the lead agency must perform an initial study to determine whether an environmental impact report (EIR) or negative declaration (ND) must be prepared.
If the project will not have a significant effect on the environment, the lead agency can prepare a ND. A lead agency can instead prepare a specific type of ND, known as a “mitigated negative declaration” (MND) for a project when the initial study has identified potentially significant effects on the environment, but:
- The project applicant proposed or agreed to changes to the project that would mitigate the effects to a point where clearly no significant effect on the environment would occur; and
- There is no substantial evidence in light of the whole record before the public agency that the project, as revised, may have a significant effect on the environment.
As articulated by the California Supreme Court,[1] a lead agency must prepare an EIR whenever substantial evidence in the administrative record supports a “fair argument” that a proposed project “may have a significant effect on the environment,” even if there is other substantial evidence that the project will not have a significant effect.
CEQA says that a fair argument must be based on “facts, reasonable assumptions predicated upon facts, and expert opinion supported by facts.” It does not include “argument, speculation, unsubstantiated opinion or narrative, evidence which is clearly inaccurate or erroneous, or evidence of social or economic impacts which do not contribute to, or are not caused by, physical impacts on the environment.” The fair argument standard applies to both NDs and MNDs: in the case of an MND, it can be challenged on the basis that there is a fair argument that even though some mitigation was proposed, there may still be a significant effect on the environment.
Environmental Impact Report. If the lead agency can’t prepare an ND or MND, or chooses not to, they must prepare an Environmental Impact Report (EIR). An EIR provides thorough environmental review of a proposed project, analyzing the significant direct and indirect impacts of a proposed project on a long list of environmental factors, including water quality, transportation, air quality and greenhouse gas emissions, land use, wildfire risk, and many others. The EIR also includes proposed mitigation measures for any significant effects that it identifies. It also requires a consideration of alternatives to the proposed project, and a consideration of cumulative and growth-inducing impacts.
While adoption of a ND, MND, and an EIR may result in approval of a project that has no significant effect on the environment (whether because those effects were mitigated or the project simply has no effects), the level of analysis is distinctly different. The table below summarizes some of the key differences between a ND, including a MND, and an EIR.
Negative Declaration (including a MND) | Environmental Impact Report | |
Trigger | Initial study finds potential significant impacts, but revisions/mitigation added before public review reduce impacts below significance. | Substantial evidence supports a “fair argument” that the project may have a significant environmental effect. |
Legal Challenge Standard | “Fair argument” standard applies to the decision not to prepare an EIR. | “Substantial evidence” standard (deferential) for agency’s factual conclusions in the EIR. |
Level of Analysis | Focused analysis confirming mitigation effectiveness; less detailed than EIR. | Comprehensive analysis of direct, indirect, growth-inducing, and cumulative impacts. |
Alternatives Analysis | Not required. | Required. Must analyze an alternative where the project does not occur and a reasonable range of other alternatives. |
Public review process (minimum standards) | Prepare ND or NMD; publish and solicit comments for 20-30 days; adopt ND or NMD. Lead agency considers comments from public, but formal written responses not required. | 30 day period to solicit comments on scope of EIR; prepare draft EIR and solicit comments for 45 days; make changes and publish final EIR. Formal written responses from lead agency required. |
Thresholds of significance. EIRs include thresholds of significance—qualitative or quantitative levels at which an impact becomes significant. These thresholds are set by the lead agency, but must be based to the extent possible on scientific and factual data. These thresholds may be project specific, but many agencies adopt general thresholds or use a checklist developed by LCI.
CEQA costs and timelines. While comprehensive data on the costs of CEQA analysis itself can be difficult to pinpoint, a 2017 California Natural Resources Agency report stated that the cost of a ND or MND can be assumed to be $65,000 to $90,000, whereas the cost of a typical EIR may be between $300,000 to $400,000.[2]
According to some reports, preparing an EIR often takes one to two years (longer for very large or complex projects). This duration is a function of the in-depth nature of the analysis in an EIR as well as various notice and comment periods required for that type of document. A ND or MND often takes only three to nine months. These timelines can add costs to projects indirectly by delaying approvals.
The Housing Action Coalition, Prosperity California, and the Rural County Representatives of California want to make changes to speed up the CEQA process.
Proposed Law
Senate Bill 607 repeals the fair argument standard, modifies the infill exemption under CEQA, narrows the scope of environmental review on some projects that do not qualify for exemptions, and makes other changes to CEQA.
Repeal of fair argument standard. SB 607 changes the criteria and legal standard by which lead agencies evaluate whether to prepare an MND, ND, or EIR. SB 607 also flips the standard for preparing a ND or MND under existing law (from requiring a ND or MND when there is no substantial evidence that the project may have a significant effect) to instead require:
- A ND to be prepared if there is substantial evidence, in light of the whole record before the lead agency, that the project will not have a significant effect on the environment;
- A MND to be prepared if an initial study identifies potentially significant effects on the environment, but (1) revisions in the project plans would avoid or mitigate the effects; and (2) there is substantial evidence, in light of the whole record before the lead agency, that the project, as revised, will not have a significant effect on the environment; and
- An EIR to be prepared if there is no substantial evidence, in light of the whole record before the lead agency, that the project will not have a significant effect on the environment.
The bill makes a related change that defines the term “may have a significant effect on the environment” to mean that there is no substantial evidence in the record that the proposed project will not have a significant effect on the environment.
Housing element rezoning. SB 607 excludes from CEQA any rezoning that is consistent with an approved housing element.
CEQA analysis of “near miss” projects. SB 607 creates a new environmental review process for projects that do not meet the eligibility criteria for a CEQA exemption based on one eligibility condition (“near miss”). This process:
- Requires the initial study or EIR to examine only those effects that the lead agency determines, based upon substantial evidence in the record, are caused solely by the single condition that makes the proposed project ineligible for the exemption, as provided; and
- Limit this alternative environmental review process to remove the alternatives analyses, and consideration of cumulative or growth inducing impacts of the project which would normally be considered in an EIR.
A “condition” that makes a project ineligible can be either a physical feature or effect upon the environment caused by the project.
The bill excludes from this process those projects that are ineligible for an exemption due to two or more conditions.
Infill exemption changes. SB 607 requires LCI to make numerous changes to the Class 32 infill categorical exemption (infill exemption) by July 1, 2026. SB 607 requires LCI to amend the infill exemption to allow a housing development to be eligible for the exemption even if it is not consistent with the applicable general plan or applicable zoning designation and regulations, so long as the project is proposed on a site identified as suitable or available for very low-, low-, or moderate-income households in a jurisdiction’s compliant housing element. The bill also expands the infill exemption to apply outside of city limits, if the project site is:
- Substantially surrounded by urban uses and within an urbanized area or urban cluster as defined by the United States Census; or
- Within an area that LCI has determined to be an eligible urban infill site.
SB 607 directs LCI to, by July 1, 2026, identify and map eligible infill sites within every urbanized area or urban cluster where the local jurisdiction’s most recent general plan or most recently approved housing element has a zoning designation that is consistent with infill development, regardless of whether the site is substantially surrounded by urban uses.
Additionally, SB 607 provides that a project is still eligible for the infill exemption even if there is a reasonable possibility that the activity will have a significant effect due to unusual circumstances.
SB 607 also requires LCI to establish thresholds of significance that lead agencies can use when determining whether a project is eligible for the infill exemption. The bill specifies that if the lead agency chooses to use these thresholds, they shall act as “safe harbors” and not be subject to litigation.
The bill provides that a project that would have been eligible for the infill exemption before the changes made by this bill must still be eligible after the bill is signed.
Finally, the bill provides that if a project is consistent with the applicable land use standards (except as modified by this bill) and occurs within the geographic limitations applicable to the infill exemption, but is otherwise ineligible for the exemption because of one or more condition, any CEQA analysis of that project must focus only on those conditions that made it ineligible.
Other changes. SB 607 makes various other changes, including to:
- Limit what can be included in the administrative record specifically to exclude emails that were not presented to the final decision-making body;
- When a court finds that an exemption was improperly applied, limits the court’s order to requiring analysis of only those conditions that made it ineligible;
- Provides throughout the bill that none of the changes to CEQA apply to distribution centers or oil and gas infrastructure, as defined; and
- Makes other technical and conforming changes.
Comments
1. Purpose of the bill. According to the author, “For California to succeed as a state, we need to build an abundance of housing, child care centers, transportation, clean energy, and all the things that make life better and more affordable for people. CEQA provides communities with important safeguards against projects like fossil fuel plants and warehouses that have caused real harm. But too often it has also been abused as a tool to block and delay projects for reasons that have nothing to do with environmental protections. That includes projects that are absolutely essential to protecting our environment like clean energy, urban housing, and public transportation. SB 607 is a good government measure that makes several smart process changes to focus CEQA on the projects that demand additional scrutiny for their environmental impact, while speeding up the things we need to make California cleaner and more affordable for all Californians.
“Senate Bill 607 does not diminish CEQA’s environmental protections, and it does not suggest additional CEQA exemptions for housing projects. Rather it improves the ability to build in the areas we know to be the most environmentally sustainable for development-- urban, infill areas-- while preserving CEQA’s existing standard of environmental protection for projects with a clearly egregious environmental impact. In that sense, SB 607 more closely aligns CEQA with its original intent. This bill will focus CEQA analysis on good-faith concerns that CEQA should address, improving the public’s ability to actually learn from CEQA disclosures without having to comb through thousands of pages of analysis that CEQA documents normally require.”
2. Shot through the heart? CEQA inherently embodies a tension between its mandate for thorough environmental review and the practical demands for efficient project approval processes. The fair argument standard lies at the crux of this dynamic. It prioritizes environmental protection and comprehensive analysis when uncertainty exists regarding potential impacts by requiring an EIR. An EIR requires extended comment periods, drafts, and responses to comments from the public to make sure public input is fairly considered. Courts consider the EIR “the ‘heart of CEQA.’ Its purpose is to inform the public and its responsible officials of the environmental consequences of their decisions before they are made. Thus, the EIR ‘protects not only the environment but also informed self-government.’”[3] Similarly, CEQA seeks to avoid a circumstance where lead agencies have already decided on the project they want to do without looking at different ways of accomplishing their goals that might have fewer adverse consequences. The fair argument standard attempts to further that end by requiring lead agencies to look at alternatives as part of EIR development, which is not required for a MND or ND.
SB 607 repeals the fair argument standard and replaces it with the “substantial evidence” standard, which is more deferential to public agencies. By doing so, the bill makes it more likely that state and local agencies will prepare NDs or MNDs instead of EIRs, reducing public comment periods, consideration of alternatives, analysis of cumulative impacts, and analysis of growth-inducing impacts. Other provisions of the bill limit the scope of environmental review in other ways, such as by restricting analysis of impacts for projects that are not eligible for the infill exemption to only those conditions that made the project ineligible, even if there are multiple conditions that depart from the infill exemption requirements.
In some contexts, reduction in environmental review may be beneficial as projects may get built more quickly without significant risks of unmitigated environmental impacts. However, many opponents to this measure note that this could result in less analysis, which they fear could weaken or negate mitigation of important impacts with fewer opportunities for the public to weigh in. For example, opponents note that under current law, MNDs must only include mitigation measures previously proposed by, or agreed to, by project developers. By triggering the need for an EIR, the current fair argument standard allows for a broader discussion and analysis of impacts, and what the necessary mitigation measures are for the surrounding community. This is a particular concern in communities that are economically disadvantaged and already face heavier pollution burdens, where individuals lack the resources to effectively fight harmful projects with other tools. Because SB 607 limits the opportunity to present a fair argument that then necessitates discussion of the impacts of a project and what the proper mitigation measures should be, the perspectives of these communities may be left out. The Committee may wish to consider amending SB 607 to provide additional tools, whether through the fair argument standard or other mechanisms, for underrepresented communities to ensure that their voices are heard.
3. So close. Under current law, if a project doesn’t qualify for an exemption, it must go through the CEQA process, including the potential for a full EIR. SB 607 proposes to create a category of “near-miss” projects that miss qualifying for an exemption because of a single condition. Under SB 607, the CEQA analysis of these near-miss projects must only study the effects caused solely by that condition. The bill defines a physical condition to mean either a significant effect on the environment or a physical feature of the project. However, opponents to the measure note that these types of conditions are not interchangeable—a physical feature may result in multiple environmental impacts. It is unclear whether a project that contains a single physical feature that results in multiple environmental effects could qualify for this process, or whether the possibility of multiple effects would disqualify such a project. Accordingly, this provision might be broadly interpreted to allow lead agencies to use this process in lieu of an EIR for significant projects that have many impacts, narrowly interpreted such that it is rarely used, or somewhere in between. In any case, this provision could lead to litigation as lead agencies, applicants, and stakeholders turn to the courts to interpret how this standard must be applied.
4. Fill it up, please. The Class 32 infill exemption serves to encourage efficient development patterns and reductions in greenhouse gas emissions and vehicle miles traveled by making it easier to approve projects that are close to urban cores and are already surrounded by development. SB 607 proposes various changes to the Class 32 infill exemption. It requires LCI to set “safe harbor” thresholds of significance for the transportation, air, water, or noise impacts, as well as determining thresholds to determine that the site has no value as habitat for endangered, rare or threatened species and can be adequately served by all required utilities and public services. It further expands the infill exemption to apply to projects some unincorporated areas of the state and tasks LCI with mapping additional areas, whether or not they are “substantially surrounded by urban uses.” Finally, it removes the “unusual circumstances” exception for when this exemption can be used, which currently provides that an exemption cannot be used where unusual circumstances may lead to an otherwise exempt project having significant impacts.
These changes may reduce ambiguity about where projects must be located and what standards they must meet to qualify for the infill exemption, making it easier for project developers and lead agencies to use it. However, opponents of this measure raise concerns that this bill delegates significant authority to LCI for determining what types of projects are exempt from CEQA, potentially eliminating the ability to raise new issues in response to changing conditions and “impermissibly elevating LCI to a legislative capacity.” They note that “labor organizations have been at the forefront of identifying impacts on public health and the environment which agencies had never before addressed,” including impacts such as toxic air contaminants and Valley Fever exposure. Additionally, allowing LCI to determine new locations for infill locations, even though they may not be substantially surrounded by other development, solely because the zoning for the parcel is consistent with infill development may result in greenfield development benefitting from a CEQA exemption in a way that is inconsistent with the state’s climate and vehicle miles traveled goals. Finally, LCI may not possess the on-the-ground knowledge of the specific circumstances in communities across the state that elected officials—state and local—bring to avoid misclassifying lands as infill. The Committee may wish to consider whether SB 607’s changes to the infill exemption are consistent with the historic purpose of this exemption.
5. Interaction with housing approvals. CEQA lawsuits frequently focus on housing projects, including both large greenfield developments with thousands of units, as well as smaller infill projects. One of the goals of SB 607 is to reduce those occurrences. To do so, the bill makes many changes to CEQA, including some that specifically focus on housing projects and some that are broadly applicable but have particular implications for housing projects and local approvals. The Committee may wish to consider the following issues:
- The Housing Accountability Act (HAA) limits the ability of local governments to deny or place conditions on housing projects that meet local objective standards. This prevents local governments from applying many project-specific requirements. This has forced some local governments to rely on CEQA to impose conditions that they otherwise can’t. Because of the wide ranging changes to CEQA made by this bill, more housing projects will be subject to either: (1) less rigorous review through a MND or the near-miss provisions of SB 607 or (2) no review because of the expanded infill exemption. In some cases, this may mean that some housing projects may have significant effects that go unmitigated. This is because mitigation is not required for exempt projects, and MNDs are prepared for projects based on mitigations proposed or agreed to by the developer of the project. Finally, the HAA also already limits local governments’ ability to voluntarily require an EIR, because provisions of AB 1633 (Ting, 2022) deemed it an illegal denial of a project under certain circumstances if a local government does not apply a CEQA exemption, does not adopt a ND or other CEQA document, or requires further study. In combination with the HAA’s limitations on the ability to condition a project, SB 607 may make it harder for local governments to fully mitigate the effects of housing projects in particular.
- SB 607 allows housing projects (including projects that have a commercial component) to qualify for the infill exemption even if they aren’t consistent with the general plan and zoning, as long as they are on a site designated in the housing element for below market-rate housing. This provision is intended to allow local governments to use a CEQA exemption for projects on these sites after they have adopted a housing element but before they have completed the rezoning to match. As drafted, however, the bill does not require the project benefitting from the exemption to be consistent with the adopted housing element. This might make it easier to build developments that aren’t consistent with the housing element on these sites. The Committee may wish to consider amending SB 607 to clarify that the project must be consistent with the housing element, but need not be consistent with other general plan and zoning standards if they are inconsistent with the housing element.
- While housing elements speak to the general categories of housing that must be allowed, a housing element is silent on virtually all other development. SB 607 exempts rezonings from CEQA that are “consistent” with an approved housing element. As drafted, SB 607 could be interpreted to exempt from CEQA any sort of rezoning (such as for commercial or industrial uses) that doesn’t directly conflict with the housing element. While the author committed to amendments in Senate Environmental Quality Committee on this subject, those amendments still leave room for unintended consequences. The Committee may wish to consider amending SB 607 to only exempt rezonings to implement the specific rezoning program required in the housing element under existing law or other specified aspects of the housing element.
7. Mandate. The California Constitution requires the state to reimburse local governments for the costs of new or expanded state mandated local programs. Because SB 607 imposes new duties on local governments, Legislative Counsel says it imposes a new state mandate. SB 607disclaims the state’s responsibility for providing reimbursement by citing local governments’ authority to charge for the costs of implementing the bill’s provisions.
8. Incoming! The Senate Rules Committee has ordered a double referral of SB 607: first to the Committee on Environmental Quality, which approved the bill at its April 23rd hearing on a vote of 6-0, and second to the Committee on Local Government. The author agreed to amendments in the Committee on Environmental Quality, but due to timing, those amendments will be taken in the Committee on Local Government. Those amendments include:
- Excluding from the repeal of the fair argument standard projects that are located on specified natural and protected lands;
- Allowing the lead agency to choose whether to develop an EIR or ND if there is substantial evidence in the record for both a significant impact and no significant impact;
- Clarifying changes to the housing element rezoning provisions; and
- Other technical and clarifying changes.
Support and Opposition
(4/25/2025)
Support: Bay Area Council (Co-Sponsor)
Housing Action Coalition (Co-Sponsor)
Prosperity California (Co-Sponsor)
Rural County Representatives of California (RCRC) (Co-Sponsor)
Mayor Matt Mahan, City of San Jose
AARP
Abundant Housing LA
American Council of Engineering Companies of California
American Planning Association, California Chapter
Association of Environmental Professionals
California Apartment Association
California Big City Mayors Coalition
California Building Industry Association (CBIA)
California Business Properties Association
California Chamber of Commerce
California Downtown Association
California State Association of Counties (CSAC)
California Yimby
Chamber of Progress
Circulate San Diego
County of Sacramento
East Bay Yimby
Elevate California
Fieldstead and Company, INC.
Greater Cornejo Valley Chamber of Commerce
Grow the Richmond
Institute for Responsive Government Action
Leadingage California
Lisc San Diego
Mountain View Yimby
Napa-Solano for Everyone
Northern Neighbors
Peninsula for Everyone
Redlands Yimby
Santa Cruz Yimby
Santa Rosa Yimby
SF Yimby
South Bay Yimby
South Pasadena Residents for Responsible Growth
SPUR
Streets for All
The Two Hundred
Ventura County Yimby
Yimby Action
Yimby LA
Yimby SLO
Opposition: 1000 Friends Protecting Historic Benicia
350 Bay Area Action
350 Conejo / San Fernando Valley
350 South Bay Los Angeles
350 Southland Legislative Alliance
Advocates for the Environment
Alta Peak Chapter, California Native Plant Society
American River Trees
Animal Welfare Institute
Arroyos & Foothills Conservancy
Ban Sup (Single Use Plastic)
Battle Creek Alliance
Beverly-Vermont Community Land Trust
Biodiversity First!
Biofuelwatch
Brentwood Alliance of Canyons & Hillsides
California Chaparral Institute
California Cities for Local Control
California Coastal Protection Network
California Comminuties Against Toxics
California Environmental Justice Alliance (CEJA)
California Native Plant Society
California Native Plant Society, Alta Peak Chapter
California Nurses for Environmental Health and Justice
California Preservation Foundation
California River Watch
California Rural Legal Assistance Foundation
California State Council of Laborers
California Wilderness Coalition (CALWILD)
California Wildlife Foundation/California Oaks
Californians for Alternatives to Toxics
Californians for Pesticide Reform
Canyon Back Alliance
Catalysts for Local Control
Center for Biological Diversity
Center for Community Action & Environmental Justice
Center for Environmental Health
Center for Food Safety
Center on Race, Poverty & the Environment
Citizens Committee to Complete the Refuge
Citizens for Los Angeles Wildlife (CLAW)
Citizens for the Preservation of Parks & Beaches
Citizens Preserving Venice
City of Lynwood
Clean Water Action
Cleanearth4kids.org
Cleveland National Forest Foundation / Save Our Forest and Ranchlands
Climate Action California
Climate Equity Policy Center
Climate First: Replacing Oil & Gas (CFROG)
Coalition for a Beautiful Los Angeles
Coast Action Group
Coastal Corridor Alliance
Coastal Environmental Rights Foundation
Coastal San Pedro Neighborhood Council
Comite Civico Del Valle
Communities for a Better Environment
Community Environmental Advocates Foundation
Conservation Congress CA
D4ward
Defenders of Wildlife
Earthjustice
East Yard Communities for Environmental Justice
Ecologistics
Elfin Forest / Harmony Grove Town Council
Endangered Habitats League
Environmental Action Committee of West Marin
Environmental Center of San Diego
Environmental Defense Center
Escondido Creek Conservancy
Esperanza Community Housing
Facts Families Advocating for Chemical and Toxics Safety
Forest Unlimited
Forests Forever
Friends Foundation International
Friends of Ballona Wetlands
Friends of Gualala River
Friends of Harbors, Beaches and Parks
Friends of Lafferty Park
Friends of Loma Alta Creek
Friends of Rose Canyon
Friends of the Dunes
Friends of the Eel River
Friends of the Inyo
Friends of the Los Angeles River
Friends of the River
Friends of the West Shore
Green Foothills
Greenfield Walking Group
Hills for Everyone
Hills2000_friends of the Hills
Homey
In Defense of Animals
Ks Connectivity
Landwatch - San Luis Obispo County
Landwatch Monterey County
Leadership Counsel for Justice and Accountability
Livable California
Long Beach Alliance for Clean Energy
Long Beach Heritage
Los Angeles Alliance for a New Economy (LAANE)
Los Angeles Audubon Society
Los Angeles Neighborhood Land Trust
Los Angeles Waterkeeper
Los Cerritos Wetlands Land Trust
Los Padres Forest Watch
Madrone Audubon Society, Sonoma County
Marin Conservation League
Mission Street Neighbors
Morongo Basin Conservation Association
Mountain Area Preservation
Move LA
Natural Resources Defense Council (NRDC)
Neighborhood Coalition Sonoma County
North County Watch
Northern Chumash Tribal Council
Owens Valley Committee
Palos Verdes/south Bay Audubon
Partnership for Policy Integrity
Paula Lane Action Network
Pesticide Action & Agroecology Network
Petaluma River Council
Physicians for Social Responsibility - Los Angeles
Physicians for Social Responsibility - San Francisco Bay Area Chapter
Planning and Conservation League
Poder Sf
Poison Free Malibu
Preservation Action Council of San Jose
Preserve Calavera
Preserve Rural Sonoma County
Preserve the American River
Preserve Wild Santee
Protect Ballona Wetlands
Protect San Benito County
Public Interest Law Project
Queers X Climate
Race & Equity in All Planning Coalition (REP-SF)
Raptors are the Solution
Respct - Residents for an Equitable San Pedro Community Today
River City Waterway Alliance
Rose Foundation for Communities and the Environment
Rural Canyons Conservation Fund
Russian Riverkeeper
Safe Routes Partnership
Saje
San Francisco Baykeeper
Santa Barbara Audubon Society
Santa Clara Valley Bird Alliance
Santa Cruz Climate Action Network
Santa Susana Mountain Park Association
Save Lafayette
Save Our Heritage Organization
Save the American River Association
Save the Park
Save the Sonoma Coast
SC Wildlands
Sierra Club California
Sierra Nevada Alliance
Sierra Watch
Socal 350 Climate Action
Solano County Orderly Growth Committee
Sonoma County Climate Activist Network (SOCOCAN!)
Sonoma Land Trust
Sonoma Mountain Preservation
South of Market Community Action Network (SOMCAN)
Southwest Wetlands Interpretive Association
State Alliance for Firesafe Road Regulations (SAFRR)
State Building & Construction Trades Council of California
Sunflower Alliance
Sunnyvale United Neighbors
The Big Wild
The River Otter Ecology Project
The River Project
The Urban Wildlands Group
Transition Sonoma Valley
Transportation Solutions Defense and Education Fund
Turtle Island Restoration Network
Union of Concerned Scientists
Unite Here International Union, Afl-cio
Unite Here Local 11
Urban Habitat
Urban Wildlife Research Project
We Advocate Thorough Environmental Review
West Berkeley Alliance for Clean Air and Safe Jobs
West County Rural Alliance
Western Center on Law & Poverty
Wishtoyo Foundation
-- END --
No Oil, Inc. v. City of Los Angeles (1974) 13 Cal. 3d 68 ↑
California Natural Resources Agency. “Standardized Regulatory Impact Assessment: CEQA Guidelines Updates.” https://dof.ca.gov/wp-content/uploads/sites/352/Forecasting/Economics/Documents/CEQAUpdatesSRIA_CNRA_12-6-17.pdf ↑
Citizens of Goleta Valley v. Board of Supervisors (1990) 52 Cal. 3d 553. ↑
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Blakespear, Chair
2025 - 2026 Regular
Bill No: SB 607
Author: | Wiener | ||
Version: | 3/24/2025 | Hearing Date: | 4/23/2025 |
Urgency: | No | Fiscal: | Yes |
Consultant: | Brynn Cook | ||
SUBJECT: California Environmental Quality Act: categorical exemptions: infill projects
DIGEST: This bill makes numerous changes to the California Environmental Quality Act (CEQA) including changing the criteria and legal standing to use a negative declaration (ND) or mitigated negative declaration (MND) vs an EIR establishing a new, limited environmental review process for projects that fail to meet the criteria for CEQA exemptions by one condition; limiting the information that can be included in the administrative record; exempting rezoning from CEQA if the rezone is consistent with a housing element; tasking the Office of Land Use and Climate Innovation with developing thresholds of significance for some environmental impacts; and making significant changes to the requirements and application of the Class 32 “infill” categorical exemption, among other changes.
ANALYSIS:
Existing law:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a project to prepare a negative declaration (ND), mitigated negative declaration (MND), or environmental impact report (EIR) for the project, unless the project is exempt from CEQA. (Public Resources Code (PRC) §21000 et seq.). If a project may have a significant effect on the environment, the lead agency must prepare a draft EIR. (CEQA Guidelines §15064(a)(1), (f)(1))
- Establishes legal standing for the lead agency selecting CEQA documents:
- NDs and MNDs are held to the “fair argument” standard, which means that if a “fair argument” can be made that a project may have a significant effect on the environment, an EIR shall be prepared even though there may be other substantial evidence that the project will not have a significant effect (CEQA Guidelines § 15064(f)(1)).
- Defines “substantial evidence” to mean that there is enough relevant information and reasonable inferences from this information that a fair argument can be made to support a conclusion, even though other conclusions might also be reached (CEQA Guidelines § 15384)
- NDs and MNDs are held to the “fair argument” standard, which means that if a “fair argument” can be made that a project may have a significant effect on the environment, an EIR shall be prepared even though there may be other substantial evidence that the project will not have a significant effect (CEQA Guidelines § 15064(f)(1)).
- Establishes over 120 CEQA exemptions in the public resources code, water code, government code and other statutes, and includes 33 categorical CEQA exemptions in the California Code of Regulations. (CEQA guidelines §15260-15285)
- The CEQA Guidelines include the Class 32 categorical exemption for infill development projects that meet the following criteria:
- The project is consistent with the applicable General Plan designation and all applicable General Plan policies as well as with applicable zoning designation and regulations;
- The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses;
- The project site has no value as habitat for endangered, rare, or threatened species;
- Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality; and
- The site can be adequately served by all required utilities and public services. (CEQA Guidelines §15332)
- Establishes tiered CEQA review. When an EIR has been certified for a General Plan, the CEQA analysis of later projects can be limited to those significant effects that “are peculiar to the parcel or to the project” and that either were not addressed as significant effects in the plan’s EIR or that new information shows will be more significant than when the plan’s EIR was certified. (Public Resources Code § 21083.3, CEQA Guidelines § 15183.
- Specifies what can be included in the administrative record, which includes the environmental review documents and comments, relevant studies and staff reports, transcripts of minutes, written evidence or correspondence submitted to, or transferred from, the respondent public agency with respect to compliance with CEQA or with respect to the project, proposed findings, among other items. Specifically includes other written material relevant to the public agency’s compliance with this division or to its decision on the merits of the project, including all internal agency communications, including staff notes and memoranda related to the project or to compliance with this division.
This bill:
- Changes the criteria and legal standing by which lead agencies evaluate whether to use an MND, ND, or EIR, upending the ‘fair argument’ standard requiring that EIR be used if there is a “fair argument” that a project has significant effects on the environment, and instead establishes the following definitions for ND, MND, or EIR:
- An ND shall be prepared if there is substantial evidence, in light of the whole record before the lead agency, that the project will not have a significant effect on the environment.
- An MND shall be prepared if an initial study identifies potentially significant effects on the environment, but (A) revisions in the project plans would avoid or mitigate the effects to a point where no significant effect on the environment would occur, as determined by the public agency based upon substantial evidence on the record; and (B) there is substantial evidence, in light of the whole record before the lead agency, that the project, as revised, will not have a significant effect on the environment.
- An EIR shall be prepared if there is no substantial evidence, in light of the whole record before the lead agency, that the project
will not have a significant effect on the environment.
- Defines “May have a significant effect on the environment” to mean that there is no substantial evidence in the record that the proposed project will not have a significant effect on the environment—this term is referenced dozens of times in the CEQA statute.
- Exempts from CEQA any rezoning that is consistent with an approved housing element.
- Limits what can be included in the administrative record specifically to exclude emails that were not presented to the final decision-making body.
- Creates a new environmental review process for projects that do not meet the eligibility criteria for a CEQA exemption based on one eligibility condition (“near miss”). Specifies that this new environmental review process would:
- Require the initial study or EIR to examine only those effects that the lead agency determines, based upon substantial evidence in the record, are caused solely by the single condition that makes the proposed project ineligible for the exemption, as provided.
- Limit this alternative environmental review process to remove the alternatives analyses, and consideration of cumulative or growth inducing impacts of the project which would normally be considered in an EIR.
- Requires LCI to establish ‘thresholds of significance’ that lead agencies can use when determining whether a project is eligible for the Class 32 infill exemption which specifies that projects must not have significant impacts on air, water, noise among other criteria, among other eligibility criteria.
- Specifies that if the lead agency chooses to use these thresholds, they shall act as “safe harbors” and not be subject to litigation.
- Tasks LCI with mapping the sites that are eligible for the Class 32 infill exemption’s geographic criteria by January 1, 2026.
- Requires LCI to amend existing Class 32 infill categorical exemption in the following ways:
- Allows a housing development to be eligible for the exemption even if it is not consistent with the applicable General Plan designation, applicable General Plan policies, or applicable zoning designation and regulations, so long as the project is proposed on a site identified as suitable or available for very low-, low-, or moderate-income households in the local jurisdiction’s most recent adopted and state compliant housing element.
- A project does not have to be in a city limit to be eligible for this exemption if it is:
- Substantially surrounded by urban use and it is within an urbanized area or urban cluster on a project site; or
- Within an area that the Office of Land Use and Climate Innovation has determined to be an eligible urban infill site pursuant to subdivision.
- A project may have significant impacts resulting from “unusual circumstances” and still be eligible for this exemption.
- Specifies that none of the changes to CEQA outlined in 1-8 above apply to distribution centers or oil and gas infrastructure, and defines ‘distribution center’ and ‘oil and gas infrastructure’.
Background
- The A, B, C’s of CEQA. CEQA is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment. CEQA is enforced by civil lawsuits that can challenge any project’s environmental review. Nonprofits, private individuals, public agencies, advocacy groups, and other organizations can all file lawsuits under CEQA.
- ND/MND vs. EIR environmental review. Under CEQA, projects (unless they have a specific exemption) must undergo environmental analysis. This process starts with an initial study which determines what level of further environmental review is needed for a given project. If a project has no significant effects on the environment, or if those effects can be fully mitigated, the project can move forward with a negative declaration (ND) or mitigated negative declaration (MND). If the initial study finds that the project has potential significant effects on the environment, then a full EIR is required. An EIR provides thorough environmental review of a proposed project, analyzing the significant direct and indirect environmental impacts of a proposed project on water quality, transportation, air quality and greenhouse gas emissions, terrestrial and aquatic biological resources, surface and subsurface hydrology, land use and agricultural resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, and cultural resources, among other factors. The EIR also includes proposed mitigation measures for any significant effects that it identifies. It also requires a consideration of alternatives to the proposed project, and a consideration of cumulative and growth-inducing impacts.
- Legal standing for EIR vs. ND/MND. CEQA documents, if challenged in court, are held to different standards of judicial review depending on what document is used. A lead agency’s determination to use an ND/MNDs or EIR is held to the “fair argument” standard, which means that if a “fair argument” can be made that a project may have a significant effect on the environment, an EIR shall be prepared even though there may be other substantial evidence that the project will not have a significant effect. Only if there are clearly no significant effects and no fair argument to be made that there are significant effects would an ND/MND be used (CEQA Guidelines § 15064(f)(1)).
- CEQA Guidelines The CEQA Guidelines (Title 14, Division 6, Chapter 3 of the California Code of Regulations) are the regulations that govern implementation of CEQA. The CEQA Guidelines reflect both the requirements developed in legislation, as well as court decisions interpreting the statute and practical planning considerations. Among other things, the CEQA Guidelines explain how to determine whether an activity is subject to environmental review, what steps are involved in the environmental review process, and the required content of environmental documents. The CEQA guidelines also include numerous categorical exemptions, which are not included in statute, and are developed for projects that are unlikely to have significant impacts on the environment. LCI, formerly the Governor’s Office of Planning and Research (OPR), develops the guidelines and CNRA adopts them.
- Administrative record. The administrative record is at the heart of CEQA lawsuits. The administrative record is the comprehensive document on which CEQA cases are argued. As such, it includes all the material that might be important to address questions and concerns that could arise when the judge considers a CEQA case. Relevant documents can include: studies, analyses, transcripts of meetings or proceedings, all environmental review documents, reports, and public comments related to the environmental review of the project. Internal staff emails about the project and staff notes are also included in the record of proceedings.
Because the entire CEQA case is argued off of the administrative record, it behooves the plaintiff/petitioner to include all documents and materials that could be relevant to making their case. As a result, the administrative record can be large, and preparing it takes months, sometimes extending beyond a year.
- CEQA exemptions. Some projects may be eligible for CEQA exemptions. If a project is exempt from CEQA, the lead agency simply identifies which exemption the project is eligible for, and no further environmental review or public engagement is required.
There are two types of CEQA exemptions—statutory and categorical. Statutory exemptions are created by the Legislature and apply even if a project has the potential to significantly affect the environment. In contrast, categorical exemptions, which are developed by the LCI and approved by the Secretary of the Natural Resources Agency as part of the CEQA guidelines, generally do not apply if there are significant environmental impacts associated with the project.
There are over 120 statutory CEQA exemptions in the Public Resources Code, Water Code, Government Code, Health and Safety Code. There are also 33 categorical CEQA exemptions listed in the CEQA guidelines. These include a categorical exemption for infill development projects (Class 32 CEQA exemption).
In addition to these statutory and categorical exemptions, projects may also forgo the CEQA process if they move through a by-right or ministerial process. Current law has established a ministerial approval process for both affordable and market-rate multifamily housing projects (SB 35 Wiener, Chapter 366, Statutes of 2017) so long as the projects meet certain labor requirements and are not located in a sensitive area. This ministerial process was expanded recently to include more housing projects in more areas (SB 423, Wiener, Chapter 778, Statutes of 2023).
- Class 32 categorical infill CEQA exemption. The Class 32 “Infill” Categorical Exemption (CEQA Guideline Section 15332), applies broadly to any type of project, including residential, commercial, industrial, public facility, and/or mixed-use projects. To offset this extremely broad criteria, the Class 32 exemption also has specific eligibility criteria, including:
- Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality.
- The project is consistent with the applicable General Plan designation and all applicable General Plan policies as well as with applicable zoning designation and regulations.
- The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses.
- The project site has no value as habitat for endangered, rare or threatened species.
- The site can be adequately served by all required utilities and public services.
- The class consists of environmentally benign infill projects that are consistent with the General Plan and Zoning requirements.
- Significance thresholds in CEQA. One of the primary purposes of an EIR is to identify a project’s significant environmental effects and propose mitigation measures for those significant impacts. Significant impacts could affect the physical conditions “existing within the areas which will be affected by the proposed project, including as a substantial, or potentially substantial, adverse change in any of the physical conditions within the area affected by the project including land, air, water, minerals, flora, fauna, ambient noise, and objects of historic or aesthetic significance.”
What is the threshold that tips an environmental effect into the “substantial or potentially substantial” category? The effects of a project do not have to be zero to be less than significant (e.g. Oakland Heritage Alliance v. City of Oakland, (2011) 195 CA 4th 884,899; National Parks and Conserv. Ass’n v. County of Riverside (1999) 71 CA 4th 1341, 1359).
Ultimately, the lead agency is responsible for determining whether an environmental impact is significant or not. The lead agency’s thresholds of significance should be based to the extent possible on scientific and factual data, and can be based on a number of sources including:
• Policies or thresholds of significance adopted and implemented by the lead agency;
• Performance standards adopted and implemented by regulatory agencies;
• Significance standards recommended by regulatory agencies;
• Standards in the initial study checklist in CEQA Guidelines Appendix G;
• Standards in the CEQA Guidelines triggering preparation of an EIR.
- General Plans and CEQA. A General Plan is each local government’s blueprint for meeting the community’s long-term vision for the future. The General Plan includes land use, circulation, conservation, open space, noise, safety, and housing. A Housing Element is a mandatory part of a city or county's General Plan that outlines goals, policies, and programs to address the area's housing needs.
General Plans must go through CEQA and be reviewed in an EIR. The General Plan EIR must describe the existing local and regional physical environment, as they exist when the notice of preparation of the EIR is published, emphasizing those features that are likely to be affected by the plan and the environmental constraints and resources that are rare or unique to the area (CEQA Guidelines §§ 15125(a), 15125(c)).
The General Plan lays out the plan for the jurisdiction in broad strokes: more details are included in rezoning, or specific projects that follow (CEQA Guidelines § 15146). Housing elements, rezoning, or specific projects that follow a General Plan do not need to repeat the environmental analysis already done in the General Plan EIR. Instead, the CEQA analysis of later projects can be limited to those significant effects that “are peculiar to the parcel or to the project” and that either were not addressed as significant effects in the plan’s EIR or that new information shows will be more significant than when the plan’s EIR was certified (CEQA Guidelines § 15183). This tiering reduces redundancies in environmental review between the EIR of General Plan, housing element, rezone, or project.
- Site check: LCI’s mapping tool. LCI maintains “Site Check,” an online mapping tool that helps visualize parcels where projects may qualify for streamlining and exemptions under CEQA. Site check allows the public to quickly identify on a map of California those areas that are frequently excluded from CEQA exemptions, like wildfire hazard zones or state conservancy areas. The tool also includes variables that are important in determining eligibility for CEQA exemptions, such as urbanized areas, or mapping existing major transit stops.
Comments
- Purpose of Bill. According to the author, “For California to succeed as a state, we need to build an abundance of housing, child care centers, transportation, clean energy, and all the things that make life better and more affordable for people. CEQA provides communities with important safeguards against projects like fossil fuel plants and warehouses that have caused real harm. But too often it has also been abused as a tool to block and delay projects for reasons that have nothing to do with environmental protections. That includes projects that are absolutely essential to protecting our environment like clean energy, urban housing, and public transportation. SB 607 is a good government measure that makes several smart process changes to focus CEQA on the projects that demand additional scrutiny for their environmental impact, while speeding up the things we need to make California cleaner and more affordable for all Californians.
“Senate Bill 607 does not diminish CEQA’s environmental protections, and it does not suggest additional CEQA exemptions for housing projects. Rather it improves the ability to build in the areas we know to be the most environmentally sustainable for development-- urban, infill areas-- while preserving CEQA’s existing standard of environmental protection for projects with a clearly egregious environmental impact. In that sense, SB 607 more closely aligns CEQA with its original intent. This bill will focus CEQA analysis on good-faith concerns that CEQA should address, improving the public’s ability to actually learn from CEQA disclosures without having to comb through thousands of pages of analysis that CEQA documents normally require.”
- Everything Everywhere All at Once. SB 607 provides six simultaneous new and far-reaching policy changes that could overhaul CEQA as it works today. In brief, this bill:
- Overturns the five decade long “fair argument” standard for determining whether to use an EIR vs ND/MND, which will lead to fewer EIRs.
- Restricts the evidence that can be considered in the Administrative Record to evaluate whether CEQA was done correctly, limiting the material that plaintiffs can use to make their case that there was something done incorrectly in the CEQA process.
- Creates a new and limited environmental review process for projects that are ‘near-misses’ for exemptions, even if that ‘near-miss’ changes the project type and environmental impacts.
- Specifies that rezoning is exempt from CEQA if it is ‘consistent’ with a housing element.
- Requires LCI to develop thresholds over which environmental impacts are considered significant for the Class 32 infill exemption, and makes those thresholds ‘safe harbors’ that locals can use instead of developing or using existing local thresholds.
- Makes several significant changes to the Class 32 infill exemption including expanding the scope of where the exemption applies and removing the criteria that projects are ineligible if they cause significant effects on the environment due to “unusual circumstances.”
Given how foundational, far reaching, and intertwined these changes are, it is impossible to predict exactly how they will affect CEQA in practice. However, it seems clear that these changes will decrease environmental review and the ability for plaintiffs to contest that environmental review was incorrect or inadequate for the majority of projects—excluding oil and gas infrastructure and distribution centers. This includes building in natural and protected areas in California, where the state has historically sought to minimize new development and its impacts. The author and committee may wish to amend the bill so that some of the most environmentally sensitive area of the state, including natural and protected lands, are not subject to these new CEQA provisions to ensure more rigorous and more predictable environmental review for projects in these pristine areas.
- Flipping the standard to favor less rigorous environmental review. Under CEQA today, if there is a “fair argument” based on substantial evidence that a project has significant impacts on the environment, that project would go through the rigorous EIR process, rather than the less rigorous ND/MNDs review. In other words, CEQA errs on the side of requiring EIRs where there is a fair case to be made that the project would have significant impacts. This is an intentional preference for more environmental review when it is unclear if there are significant impacts. In these scenarios, further environmental review may be necessary to determine if impacts are significant. It also reflects a consideration that the risk of doing unnecessary environmental review is less important than the risk of leaving environmental impacts undisclosed and unmitigated.
SB 607 flips this longstanding standard on its head. SB 607 allows lead agencies to forgo an EIR and instead do an ND/MND as long as they can provide evidence that the project’s impacts will not be significant—even in a situation where there is overwhelming evidence that there is an impact. Or put another way, a lead agency considering whether to do an EIR or ND/MND will have to choose the less rigorous ND/MND if there is any substantial evidence that a project wouldn’t have an effect, regardless of other studies saying it would have significant impacts.
It is important to distinguish that SB 607 doesn’t just ‘level the playing field’ so that lead agencies have the option to decide whether to pursue an ND/MND or EIR if there is evidence to support either choice. Instead, it swings the pendulum to require that EIRs only be used if no substantial evidence can be mustered to say that the project does not have impacts.
The author and committee may wish to amend the bill to specify that lead agencies have discretion to choose to use an ND/MND or EIR in the scenario where they have substantial evidence that the project will have an impact on the environment and substantial evidence that the project does not have an impact on the environment.
Notably, providing lead agencies with the discretion to choose to use an EIR vs. ND/MND may still lead to a dramatic reduction in the use of EIRs vs. ND/MNDs. Developers and project proponents may have more resources than community members or groups to invest in studies and experts to contribute to the ‘substantial evidence’ of effect or no effect. Leveling the playing field in terms of allowing the lead agency discretion to evaluate substantial evidence on both sides when choosing an EIR vs. ND/MND only goes so far to balance the decision to pursue EIR vs. ND/MND if the intrinsic differences in power and resources between developers and communities are not addressed.
- EIR to ND/MND –what problem does it fix? SB 607 swings the pendulum from preferring EIRs to preferring ND/MNDs. An underlying assumption behind such a shift is that EIRs are currently overused.
However, according to data provided by LCI, which houses CEQAnet, the state clearinghouse for CEQA documents, NDs/MNDs have been used between 4-5 times more often than full EIRs in recent years. In 2023, there were 282 EIRs filed through CEQAnet, and 1,439 ND/MNDs. In 2024, there were 302 EIRs and 1,296 ND/MNDs.
Only about 3% of projects in the last two years have used an EIR: the vast majority used CEQA exemptions or ND/MNDs. Given the rarity of EIRs compared to other CEQA documents, it is worth considering any assumption that overuse of EIRs is responsible for CEQA slowing down projects.
- More ND/MNDs, fewer EIRs: pros and cons. Practically speaking, the outcome of flipping the existing standard of review for EIRs vs. ND/MNDs will be fewer EIRs and more ND/MNDs.
If an ND/MND provides sufficient environmental review, then doing the more rigorous and time consuming EIR would be a waste of time and resources. In addition, lead agencies may currently err on the side of doing EIRs if the project is likely to be challenged since the “fair argument” standing in law today makes it easier to defend the decision to use EIR instead of an ND/MND.
On the other hand, using an ND/MND when there is substantial evidence that the project will have impacts on the environment could mean that significant impacts go undisclosed to decision makers or the public, community input is limited, and those impacts remain unmitigated. The decision to use an ND/MND instead of an EIR, when there is evidence to support both choices, has real-world impacts for projects costs and timelines: it also has real impacts on communities and the environment.
For example, a project to expand a dairy farm by nearly 2,000 cows was evaluated in an ND/MND, but the Attorney General’s office objected to the County’s use of an ND, stating “[b]ecause there is a fair argument that the Project will have a significant impact on the environment, we urge the County to prepare an EIR.” The AG stated that the ND did not adequately evaluate greenhouse gas (GHG) emissions and did a poor job analyzing air quality and water quality impacts.
- “Near-miss” exemption review: an idea that’s not-quite there. One of the provisions in this bill posits the novel idea of limiting environmental review for projects that miss-the-mark of being eligible for a CEQA exemption by just one criteria.
Consider the example where a project is eligible for the “minor alterations to land use limitations” Class 5 categorical exemption (CEQA Guidelines 15305) which consists of minor alterations in land use limitations in areas with an average slope of less than 20%, which do not result in any changes in land use or density (e.g. minor lot line adjustments). Under SB 607, a project that meets all the criteria of the Class 5 categorical exemption, but is in an area with an average slope of 21%, instead of 20% would only need to conduct environmental review on the impact of that 1% grade change. In this case, limiting the environmental review to just this change in 1% grade seems harmless and straightforward.
However, not all conditions for exemptions fit easily into ‘near-miss’ framework. There are over 150 CEQA exemptions, each with multiple criteria. Generally, CEQA exemptions are granted for certain types of projects, like housing, or certain areas, such as infill areas, or for projects that do not cause harm to the environment (all Categorical exemptions and numerous statutory exemptions).
As written, it is unclear how this ‘near miss’ process would be implemented for different types of CEQA exemptions (exemptions based on the ‘type’ of project, based on geographic criteria, or based on lack of environmental impacts).
- Changing Project Type. Consider the case where the one ‘condition’ that is not met for the exemption is the type of project. For example, the Class 4 categorical exemption which is for minor public or private alterations lists several examples of exemption eligible projects, including bike lanes in existing rights of ways (ROWs): if the bike lane was substituted for a diesel truck lane, the project still only misses the mark by one criteria (bike lane to diesel truck lane). While the diesel truck lane would still have to undergo environmental review for all the impacts on the environment that are caused by swapping out a diesel truck lane for a bike lane, this change disrupts the internal logic of this exemption, since bike lanes are unlikely to have impacts outside of ROWs and diesel truck lanes are very likely to have impacts outside of those ROWs.
It is also not clear how limited “near miss” environmental review would be conducted in this scenario. Would this require an EIR for the impacts of the bicycle lane to act as a baseline on which the impacts of the diesel truck will be measured, effectively requiring two EIRs? There may also be debate on whether the ‘near-miss’ process would apply in this scenario, since a diesel truck lane does not clearly fit under the category of “minor alternations to public lands.” Likewise, a change in slope gradation from 20% to 21% could change the project from being a ‘minor alteration to public lands.’ This lack of clarity would likely need to be resolved through judicial review.
- Changing the area criteria. One of the criteria for the Class 32 categorical infill exemption is that the project be surrounded 75% by urban uses: if it is actually located in the middle of a wetland rather than in an infill area, what would the environmental review consider? The impacts of a given project on an infill area and wetland could be the same, but the environmental implications are quite different. It is not clear how all the ways in which a wetland is different from an infill area can be evaluated for the ‘one condition’ environmental review.
- Changing environmental impact criteria. The Class 32 ‘infill exemption’ requires that projects meet certain criteria, including that they do not have significant air, water, transportation or noise impacts. Imagine a scenario where the near-miss is that the project has significant air quality impacts. Those air quality impacts would then be considered in the abbreviated environmental review process setup in SB 607. However, SB 607 further stipulates that projects going through this abbreviated environmental review do not have to consider cumulative impacts. For many air pollutants, such as particulate matter and nitrogen oxides, the background level of air pollution in the region is critical to determining whether additional emissions will tip air pollution in the region past human health and air quality thresholds. In a scenario where cumulative impacts cannot be considered, how would air pollution resulting from a project be evaluated in environmental review?
Expanding exemptions for projects that are “near-misses” to existing exemptions can make intuitive sense sometimes, but the concept does not hold up for all the myriad “conditions” that apply to CEQA exemptions.
- “Near-miss” loophole. Under SB 607, projects that are ‘near misses’ for CEQA exemptions go through an abbreviated review that skips the alternatives analysis, consideration of cumulative impacts and consideration of growth-inducing impacts typically required in an EIR. This creates a perverse incentive for projects to use this ‘near-miss’ process even if the project has many significant impacts on the environment that are different from the impacts for existing exemptions. While those significant differences would have to be considered in the environmental review, the project could skip the rigorous environmental review of the alternatives analysis, cumulative impacts, and growth-inducing impacts simply by using this process. Because some exemptions only have a small number of criteria, almost any project can be eligible for this process and exploit this loophole to skip important environmental review.
The author and committee may wish to amend what constitutes a “near miss” so that it does not include projects that are different in kind from the original CEQA exemption. The author and committee may also wish to specify that this “near miss” process only applies to existing CEQA exemptions, since new CEQA exemptions could be crafted to create and exploit loopholes to this process.
While these proposed amendments further clarify the intent of the “near-miss” CEQA process, they do not address many of the potential ways that the “near-miss” process could cause confusion (and resultantly litigation) or open the door to loopholes for bad actors seeking to skimp on environmental review. As the bill moves through the legislative process, the author may wish to consider removing this Section of the bill and instead tasking LCI with developing a process to consider which exemptions and criteria for those exemptions would qualify projects for this ‘near-miss’ CEQA exemption process.
- “Near miss” CEQA process washes out exemption intent. It may seem that projects that are ‘almost’ exempt from CEQA are likely projects that are environmentally benign: however, that is not true for the majority of exemptions. Categorical exemptions are for projects that are unlikely to have environmental impacts on the environment, but statutory exemptions have no such assumption. Statutory exemptions are those that the Legislature has signed off on to move forward priority projects –even if those projects have many significant impacts on the environment. Moreover, CEQA already has slimmed-down environmental review process for projects with no significant impacts: NDs and MNDs. It is worth considering the specific use cases where the ‘near-miss’ process would substantively add time savings to the existing CEQA proceses, and which projects would be better suited to use the ND/MND process.
- What is essential to an Administrative Record? The administrative record is the comprehensive document on which CEQA cases are argued. Entities preparing the record and courts hearing CEQA cases can both benefit if the material in the record includes all the necessary information, but does not include extraneous information that can be costly and time-consuming to collect and review. SB 607 narrows the scope of the administrative record by specifying that it cannot include emailed technical documents, such as a staff level discussion on the impacts of a project, unless those emails were presented to the final decision-making body.
Recent case law has established that internal staff emails and notes can provide important information into projects and should be retained by the public agency. In Golden Door Properties, LLC, et. al. v. Superior Court of San Diego County (2020) 53 Cal.App.5th 733), the Fourth District Court of Appeal held that a lead agency should retain all project-related writings and e-mails, including internal staff emails, during the CEQA statute of limitations period or any CEQA litigation.
Plaintiffs wanting to ensure that they have complete access to records may request information withheld from the administrative record in a public records act: however, SB 607 would allow an agency to prevent these documents from being part of the administrative record on which the CEQA case is argued.
While an administrative record that contains unnecessary information is not ideal, it is certainly up for debate if excluding staff emails trims the fat off the administrative record or excises an essential part of the document—and whether it will result in increased or decreased litigation timelines.
It is worth noting that the Legislature recently weighed in on the merit of including or excluding internal agency emails in the administrative record in SB 149 (2023). SB 149 struck a compromise by granting lead agencies the right to prepare the record themselves (at their own cost), despite petitioner’s right to elect to prepare it to give the agency more control over the content of the record. In addition, SB 149 specifically provided that the record need not include internal agency communications that are subject to privileges contained in the Evidence Code or exemptions under the Public Records Act. As this policy was enacted only two years ago, the implications to changes in the administrative record are still being evaluated.
- Rezoning skips CEQA so long as it is consistent with the housing element. SB 607 allows any rezoning to skip CEQA so long as it is consistent with an existing housing element. This is posited to reduce redundancy of environmental review if the housing element, which considers housing planning with broad strokes, has already considered some of the information that would be fleshed out (and potentially re-hashed) in a decision to rezone. There are two issues with this approach:
- ‘Consistent’ means a lot of things. Housing elements are one of the mandatory elements included in a General Plan alongside land use circulation, conservation, open space, noise, and safety. Rezoning a conservation area into an industrial use could be fully consistent with the housing element if the housing element does not opine on these areas.
- Removing redundancies? CEQA already does that. CEQA already creates a process to eliminate redundancy from General Plans, Housing Elements, Rezoning, and projects by allowing tiered CEQA documents. Currently, a lead agency that is rezoning can tier off of the environmental review in the General Plan or housing element, meaning that the environmental review only needs to consider the environmental impacts and unique features that were not previously considered in the housing element.
The author and committee may wish to clarify that rezoning can occur if it implements a housing element, rather than simply being consistent with a housing element.
- Tasking LCI to set thresholds and map the Class 32 infill exemption. The Class 32 infill exemption requires that projects do not have significant impacts on transportation, air, water, or noise. Lead agencies determine what thresholds of significance are—this gives locals authority to choose thresholds that make sense for their jurisdictions. However, it also introduces some legal liability under CEQA because the lead agency must defend its choice to use a specific threshold.
SB 607 seeks to remove this ambiguity and legal liability by requiring LCI to set “safe harbor” thresholds of significance for the air transportation, air, water, or noise impacts, as well as determining thresholds to determine that the site has no value as habitat for endangered, rare or threatened species and can be adequately served by all required utilities and public services. It further tasks LCI with mapping areas across the state that would be eligible for the Class 32 infill exemption based on the locational criteria.
Setting thresholds of significance and requiring LCI to map Class 32 infill areas would reduce ambiguity and make it easier for project developers and lead agencies to use the Class 32 infill exemption. LCI’s current mapping project, “Site Check”, approaches the same intent –to make it easier for lead agencies and developers to see areas that map onto geography-based CEQA exemption criteria.
SB 607 further specifies that significance thresholds determined by LCI are ‘safe harbors’ and cannot be challenged with lawsuits: this overturns existing law which specifies that significant thresholds cannot be ‘safe harbors’ and are always subject to challenge. In addition, the bill adds that if lead agencies’ thresholds are “substantially compliant” with these statewide thresholds, use of those ‘substantially compliant” thresholds cannot be challenged. Giving flexibility to allow lead agencies to use thresholds if they are ‘substantially compliant’ with LCI thresholds, could introduce some ambiguity back into this Class 32 process: since these thresholds are safe-harbors that cannot be challenged, the consequence of having disagreements on what is ‘substantially compliant” are high. As the bill continues through the legislative process, the author may wish to specify how “substantial compliance” with LCI thresholds will be determined.
- Does the Class 32 nut need cracking? SB 607 also expands the scope of the Class 32 infill exemption, including allowing it to apply to infill in urbanized areas or urban clusters and allowing certain housing projects to be inconsistent with the applicable General Plan designation, applicable General Plan policies, or applicable zoning designations and still be eligible for the exemption.
It also removes the existing ‘unusual circumstance’ environmental guardrail criteria, which specifies that the exemption does not apply if there are significant environmental impacts due to unusual circumstances. It has long been argued that the eligibility requirements for the Class 32 infill exemption –including that it be environmentally benign and that it does not have significant effects from ‘unusual circumstances’—are too restrictive, and that the ambiguity of the ‘unusual circumstances’ clause may spook project proponents from seeking this exemption.
According to data provided by LCI using CEQAnet, the State’s database of CEQA documents, the Class 32 infill exemption was filed 1,147 times in 2024. It is worth considering if the unusual circumstances clause is a significant deterrent to use of the exemption if it is being used so frequently—especially given that ‘unusual circumstances’ exclusion, while introducing some ambiguity, is intentionally broad to capture a wide range of effects that could be induced by the many different projects covered by the Class 32 infill exemption, which applies to all types of projects, including industrial, mixed use, housing, etc.
As the bill moves through the legislative process, the author may wish to consider retaining the criteria that projects not have significant impacts due to “unusual circumstances” for the Class 32 infill exemption or providing an alternate guardrail for this broad exemption.
- Loosening Environmental Review for everything but oil wells or distribution centers. SB 607 weakens environmental review in several aspects: it reduces the likelihood of using the more-rigorous EIR in favor of ND/MNDs, it creates a process where projects that are “near-misses” for exemptions can skip cumulative impact or alternatives analyses, and takes out the ‘unusual circumstances’ guardrail for the frequently used Class 32 infill exemption, among other changes. The bill also specifies that these provisions do not apply to oil wells and distribution centers—two projects that are known to have significant environmental impacts and are often located in disadvantaged communities. However, it is worth considering that oil wells and distribution centers are just two types of projects that are likely to have significant impacts, are likely to be located in disadvantaged communities, and which thus have the potential to increase, rather than diminish, the legacy of environmental injustice in planning in California. Other such projects include:
- Nuclear power and nuclear waste storage facilities.
- Industrial projects like mining projects, heavy manufacturing, port operations, incinerators, and power plants.
- Highly polluting transportation projects, like freeways, airports, railyards, and shipping terminals, which are frequently sited near disadvantaged communities.
- Large water projects like dams, desalination plants, water conveyance projects, sewage plants, and water quality control plans.
- Large projects on agricultural lands, in sensitive habitat, and/or in high fire severity zones.
- “New cities” such as the controversial “California Forever” project in Solano County.
- Updates of city and county General Plans, which typically outline the jurisdiction’s development for a 20 to 30-year period, as well as regional transportation plans and climate actions plans.
As the bill moves through the legislative process, the author may wish to consider excluding other project types beyond oil and gas wells and distribution centers that are likely to have environmental impacts and particularly environmental impacts on disadvantaged communities.
- Shaking CEQA in a changing Federal landscape. When projects have both a state and federal decision making component, they are subject to both CEQA and NEPA (CEQA provides environmental review for projects by California public agencies, while NEPA ensures that federal agencies consider the environmental impacts of decision they make). CEQA is not redundant with NEPA (notably, CEQA requires mitigation measures, which NEPA does not), but CEQA and NEPA can act in concert to ensure that there is robust environmental review baked into decision making.
On February 20, 2025, the White House Council on Environmental Quality (CEQ) posted a pre-publication notice on its website of an Interim Final Rule that rescinds its regulations implementing NEPA. CEQ has guided NEPA, which is in itself a sparse law, since 1978. CEQ simultaneously issued new guidance to federal agencies for revising their NEPA implementing procedures consistent with the NEPA statute and President Trump’s Executive Order 14,154 (Unleashing American Energy).
The Interim Final Rule became effective on April 11th. According to the National Law Review, “This action represents the final blow to CEQ’s NEPA regulations.”
In the near term, it is uncertain how NEPA will be implemented while agencies develop regulations and procedures to implement NEPA in line with President Trump’s Unleashing American Energy EO.
While NEPA is currently in flux and in a future where NEPA may play a reduced role in driving environmental review, the role of CEQA could be increasingly important to ensure that the environmental impacts of projects in California are known and mitigated whenever possible. The impacts of SB 607 on CEQA are too foundational and too intermingled to fully predict: however, it seems likely that more projects will be moving forward with less environmental review, and questions on interpretation of these changes, especially on implementation of the ‘near miss’ process, could compound the concerns of reduced environmental review and uncertainty in the Federal environmental review process.
- Committee amendments. Staff recommends the committee adopt the bolded amendments contained in comment 2, 3, 7, and 10 above.
DOUBLE REFERRAL:
If this measure is approved by the Senate Environmental Quality Committee, the do pass motion must include the action to re-refer the bill to the Senate Committee Local Government for further review.
SOURCE:
Bay Area Council; Housing Action Coalition; Prosperity Californa; RCRC
SUPPORT:
AARP
Abundant Housing LA
American Planning Association, California Chapter
Association of Environmental Professionals
Bay Area Council
California Apartment Association
California Big City Mayors Coalition
California Building Industry Association
California Building Industry Association (CBIA)
California Business Properties Association
California Chamber of Commerce
California Downtown Association
California State Association of Counties (CSAC)
California Yimby
Chamber of Progress
Circulate San Diego
County of Sacramento
East Bay Yimby
Fieldstead and Company, INC.
Grow the Richmond
Housing Action Coalition
Institute for Responsive Government Action
Leadingage California
Mayor Matt Mahan, City of San Jose
Mountain View Yimby
Napa-solano for Everyone
Northern Neighbors
Peninsula for Everyone
Redlands Yimby
Rural County Representatives of California (RCRC)
Santa Cruz Yimby
Santa Rosa Yimby
Sf Yimby
South Bay Yimby
South Pasadena Residents for Responsible Growth
Spur
Streets for All
The Two Hundred
Ventura County Yimby
Yimby Action
Yimby LA
Yimby Slo
OPPOSITION:
1000 Friends Protecting Historic Benicia
350 Bay Area Action
350 Conejo / San Fernando Valley
350 South Bay Los Angeles
350 Southland Legislative Alliance
Advocates for the Environment
Alta Peak Chapter, California Native Plant Society
American River Trees
Animal Welfare Institute
Arroyos & Foothills Conservancy
Ban Sup (single Use Plastic)
Battle Creek Alliance
Biodiversity First!
Biofuelwatch
Brentwood Alliance of Canyons & Hillsides
California Chaparral Institute
California Cities for Local Control
California Coastal Protection Network
California Comminuties Against Toxics
California Enviromental Justice Alliance
California Environmental Justice Alliance (CEJA) Action
California Native Plant Society
California Nurses for Environmental Health and Justice
California Preservation Foundation
California River Watch
California State Council of Laborers
California Wildlife Foundation/california Oaks
Californians for Alternatives to Toxics
Californians for Pesticide Reform
Calwild
Canyon Back Alliance
Catalysts for Local Control
Center for Biological Diversity
Center for Community Action & Environmental Justice
Center for Environmental Health
Center for Food Safety
Center for Race, Poverty, and the Environment
Center on Race, Poverty & the Environment
Citizens Committee to Complete the Refuge
Citizens for Los Angeles Wildlife
Citizens for the Preservation of Parks & Beaches
Clean Water Action
Cleanearth4kids.org
Cleveland National Forest Foundation
Climate Action California
Climate Equity Policy Center
Climate First: Replacing Oil & Gas (CFROG)
Coalition for a Beautiful Los Angeles
Coast Action Group
Coastal Corridor Alliance
Coastal Environmental Rights Foundation
Comite Civico Del Valle
Communities for a Better Environment
Community Environmental Advocates Foundation
Conservation Congress CA
D4ward
Defenders of Wildlife
Earthjustice
Ecologistics
Elfin Forest / Harmony Grove Town Council
Endangered Habitats League
Environmental Action Committee of West Marin
Environmental Center of San Diego
Environmental Defense Center
Escondido Creek Conservancy
Facts Families Advocating for Chemical and Toxics Safety
Forest Unlimited
Forests Forever
Friends Foundation International
Friends of Ballona Wetlands
Friends of Gualala River
Friends of Harbors, Beaches and Parks
Friends of Lafferty Park
Friends of Loma Alta Creek
Friends of Rose Canyon
Friends of the Dunes
Friends of the Eel River
Friends of the Inyo
Friends of the LA River
Friends of the River
Friends of the West Shore
Green Foothills
Greenfield Walking Group
Hills for Everyone
Hills2000_friends of the Hills
In Defense of Animals
Ks Connectivity
Landwatch - San Luis Obispo County
Landwatch Monterey County
Leadership Council for Justice and Accountability
Long Beach Alliance for Clean Energy
Long Beach Heritage
Los Angeles Audubon Society
Los Angeles Waterkeeper
Los Cerritos Wetlands Land Trust
Los Padres Forest Watch
Madrone Audubon Society, Sonoma County
Marin Conservation League
Mission Street Neighbors
Morongo Basin Conservation Association
Mountain Area Preservation
Move LA
Natural Resources Defense Council (NRDC)
Neighborhood Coalition Sonoma County
New Livable California Dba Livable California
North County Watch
Northern Chumash Tribal Council
Owens Valley Committee
Palos Verdes/south Bay Audubon
Partnership for Policy Integrity
Paula Lane Action Network
Pesticide Action & Agroecology Network
Petaluma River Council
Physicians for Social Responsibility - Los Angeles
Physicians for Social Responsibility - San Francisco Bay Area Chapter
Planning and Conservation League
Poison Free Malibu
Preservation Action Council of San Jose
Preserve Calavera
Preserve Rural Sonoma County
Preserve the American River
Preserve Wild Santee
Protect Ballona Wetlands
Protect San Benito County
Queers X Climate
Raptors are the Solution
Respct - Residents for an Equitable San Pedro Community Today
River City Waterway Alliance
Rose Foundation for Communities and the Environment
Rural Canyons Conservation Fund
Russian Riverkeeper
Safe Routes Partnership
San Francisco Baykeeper
Santa Barbara Audubon Society
Santa Clara Valley Bird Alliance
Santa Cruz Climate Action Network
Santa Susana Mountain Park Association
Save Lafayette
Save Our Heritage Organization
Save the American River Association
Save the Park
Save the Sonoma Coast
Sc Wildlands
Sierra Club California
Sierra Nevada Alliance
Sierra Watch
So Cal 350 Climate Action
Socal 350 Climate Action
Solano County Orderly Growth Committee
Sonoma County Climate Activist Network (SOCOCAN!)
Sonoma Land Trust
Sonoma Mountain Preservation
South of Market Community Action Network (SOMCAN)
Southwest Wetlands Interpretive Association
State Alliance for Firesafe Road Regulations (SAFRR)
State Building & Construction Trades Council of California
Sunflower Alliance
Tahoe Sierra Clean Air Coalition
The Big Wild
The River Otter Ecology Project
The River Project
The Urban Wildlands Group
Transition Sonoma Valley
Transportation Solutions Defense and Education Fund
Turtle Island Restoration Network
Union of Concerned Scientists
Unite Here Local 11
Urban Wildlife Research Project
We Advocate Through Environmental Review
West Berkeley Alliance for Clean Air and Safe Jobs
West County Rural Alliance
Wishtoyo Foundation
2 Individuals
-- END –
Discussed in Hearing
Senate Floor
Senate Standing Committee on Transportation
Senate Standing Committee on Appropriations
Senate Standing Committee on Local Government
Senate Standing Committee on Environmental Quality
Bill Author
Bill Co-Author(s):