SB 71: California Environmental Quality Act: exemptions: transit projects.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2025-10-13
Current Status:
Passed
(2025-10-13: Chaptered by Secretary of State. Chapter 742, Statutes of 2025.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would also exempt a transit comprehensive operational analysis, as defined, a transit route readjustment, or other transit agency route addition, elimination, or modification, from the requirements of CEQA. Because a lead agency would be required to determine whether a plan qualifies for this exemption, the bill would impose a state-mandated local program.
CEQA, until January 1, 2030, exempts from its requirements certain transportation-related projects, such as pedestrian and bicycle facilities, transit prioritization projects, public projects located on a site that is wholly within the boundaries of an urbanized area or urban cluster, as provided, for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements.
This bill would extend the operation of the above-mentioned exemption until January 1, 2040. The bill would exempt from the requirements of CEQA a public project for the protection and improvement of bus rapid transit, bus, or light rail service, including the protection, operation, and maintenance, public projects for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, and ferry, and for the protection, maintenance, construction, operation, or rehabilitation of stops that will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. The bill would, until January 1, 2032, exempt from the requirements of CEQA a public project for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, or light rail service, including the protection, maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, or hybrid powertrain vehicles, except as provided. The bill would exclude from this exemption certain public projects for the construction or rehabilitation of a ferry terminal, as provided, and, except as provided, public projects for transit services operated by a transportation network company, as defined. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
CEQA exempts from its requirements a project that consists exclusively of a combination of any of the components of specified transportation-related projects.
This bill would extend the operation of the above-mentioned exemption until January 1, 2040. The bill would, until January 1, 2040, exempt from the requirements of CEQA a project that combines any of those specified transportation-related projects and a housing development project that is either subject to a nondiscretionary approval or is exempt from CEQA, as provided. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law exempts from the requirements of CEQA public projects for the institution or increase of passenger rail service, other than light rail service that is eligible for a specified exemption, including the construction or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains.
This bill would extend the operation of the above-mentioned exemption until January 1, 2040. The bill would exempt from the requirements of CEQA public projects for the improvement of passenger rail service, other than light rail service eligible for a specified exemption, including the maintenance of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains, public projects for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities which will be exclusively used by zero-emission certified Tier 4 or cleaner rolling stock or locomotives, as provided. The bill would exclude from this exemption public projects located in certain air basins for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities that will be used by certified Tier 4 or cleaner rolling stock or locomotives that are not zero-emission rolling stock or locomotives. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law requires certain CEQA-exempt projects exceeding specified dollar amounts to meet certain criteria, as provided.
This bill would instead require certain CEQA-exempt projects that are, based on the project engineers cost estimate, anticipated to exceed a specified dollar amount, to meet certain criteria, as provided. The bill would require the Office of Land Use and Climate Innovation, beginning January 1, 2026, and every two years thereafter, to adjust these amounts to reflect changes in the Consumer Price Index, as provided, and publish the updated amounts on its internet website. The bill would authorize the Office of Land Use and Climate Innovation to implement, interpret, or make specific that provision without taking any regulatory action.
This bill would declare that its provisions are severable.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would also exempt a transit comprehensive operational analysis, as defined, a transit route readjustment, or other transit agency route addition, elimination, or modification, from the requirements of CEQA. Because a lead agency would be required to determine whether a plan qualifies for this exemption, the bill would impose a state-mandated local program.
CEQA, until January 1, 2030, exempts from its requirements certain transportation-related projects, such as pedestrian and bicycle facilities, transit prioritization projects, public projects located on a site that is wholly within the boundaries of an urbanized area or urban cluster, as provided, for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements.
This bill would extend the operation of the above-mentioned exemption until January 1, 2040. The bill would exempt from the requirements of CEQA a public project for the protection and improvement of bus rapid transit, bus, or light rail service, including the protection, operation, and maintenance, public projects for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, and ferry, and for the protection, maintenance, construction, operation, or rehabilitation of stops that will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. The bill would, until January 1, 2032, exempt from the requirements of CEQA a public project for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, or light rail service, including the protection, maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, or hybrid powertrain vehicles, except as provided. The bill would exclude from this exemption certain public projects for the construction or rehabilitation of a ferry terminal, as provided, and, except as provided, public projects for transit services operated by a transportation network company, as defined. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
CEQA exempts from its requirements a project that consists exclusively of a combination of any of the components of specified transportation-related projects.
This bill would extend the operation of the above-mentioned exemption until January 1, 2040. The bill would, until January 1, 2040, exempt from the requirements of CEQA a project that combines any of those specified transportation-related projects and a housing development project that is either subject to a nondiscretionary approval or is exempt from CEQA, as provided. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law exempts from the requirements of CEQA public projects for the institution or increase of passenger rail service, other than light rail service that is eligible for a specified exemption, including the construction or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains.
This bill would extend the operation of the above-mentioned exemption until January 1, 2040. The bill would exempt from the requirements of CEQA public projects for the improvement of passenger rail service, other than light rail service eligible for a specified exemption, including the maintenance of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains, public projects for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities which will be exclusively used by zero-emission certified Tier 4 or cleaner rolling stock or locomotives, as provided. The bill would exclude from this exemption public projects located in certain air basins for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities that will be used by certified Tier 4 or cleaner rolling stock or locomotives that are not zero-emission rolling stock or locomotives. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law requires certain CEQA-exempt projects exceeding specified dollar amounts to meet certain criteria, as provided.
This bill would instead require certain CEQA-exempt projects that are, based on the project engineers cost estimate, anticipated to exceed a specified dollar amount, to meet certain criteria, as provided. The bill would require the Office of Land Use and Climate Innovation, beginning January 1, 2026, and every two years thereafter, to adjust these amounts to reflect changes in the Consumer Price Index, as provided, and publish the updated amounts on its internet website. The bill would authorize the Office of Land Use and Climate Innovation to implement, interpret, or make specific that provision without taking any regulatory action.
This bill would declare that its provisions are severable.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would also exempt a transit comprehensive operational analysis, as defined, a transit route readjustment, or other transit agency route addition, elimination, or modification, from the requirements of CEQA. Because a lead agency would be required to determine whether a plan qualifies for this exemption, the bill would impose a state-mandated local program.
CEQA, until January 1, 2030, exempts from its requirements certain transportation-related projects, such as pedestrian and bicycle facilities, transit prioritization projects, public projects located on a site that is wholly within the boundaries of an urbanized area or urban cluster, as provided, for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements.
This bill would extend the operation of the above-mentioned exemption until January 1, 2040. The bill would exempt from the requirements of CEQA a public project for the protection and improvement of bus rapid transit, bus, or light rail service, including the protection, operation, and maintenance, public projects for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, and ferry, and for the protection, maintenance, construction, operation, or rehabilitation of stops that will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. The bill would, until January 1, 2032, exempt from the requirements of CEQA a public project for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, or light rail service, including the protection, maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, or hybrid powertrain vehicles, except as provided. The bill would exclude from this exemption certain public projects for the construction or rehabilitation of a ferry terminal, as provided, and, except as provided, public projects for transit services operated by a transportation network company, as defined. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
CEQA exempts from its requirements a project that consists exclusively of a combination of any of the components of specified transportation-related projects.
This bill would extend the operation of the above-mentioned exemption until January 1, 2040. The bill would, until January 1, 2040, exempt from the requirements of CEQA a project that combines any of those specified transportation-related projects and a housing development project that is either subject to a nondiscretionary approval or is exempt from CEQA, as provided. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law exempts from the requirements of CEQA public projects for the institution or increase of passenger rail service, other than light rail service that is eligible for a specified exemption, including the construction or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains.
This bill would extend the operation of the above-mentioned exemption until January 1, 2040. The bill would exempt from the requirements of CEQA public projects for the improvement of passenger rail service, other than light rail service eligible for a specified exemption, including the maintenance of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains, public projects for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities which will be exclusively used by zero-emission certified Tier 4 or cleaner rolling stock or locomotives, as provided. The bill would exclude from this exemption public projects located in certain air basins for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities that will be used by certified Tier 4 or cleaner rolling stock or locomotives that are not zero-emission rolling stock or locomotives. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law requires certain CEQA-exempt projects exceeding specified dollar amounts to meet certain criteria, as provided.
This bill would instead require certain CEQA-exempt projects that are, based on the project engineers cost estimate, anticipated to exceed a specified dollar amount, to meet certain criteria, as provided. The bill would require the Office of Land Use and Climate Innovation, beginning January 1, 2026, and every two years thereafter, to adjust these amounts to reflect changes in the Consumer Price Index, as provided, and publish the updated amounts on its internet website. The bill would authorize the Office of Land Use and Climate Innovation to implement, interpret, or make specific that provision without taking any regulatory action.
Existing law establishes specified procedures for the environmental review of an environmental leadership transit project, as defined, that is approved by the lead agency on or before January 1, 2025. Existing law requires the environmental leadership transit project to be located wholly within the County of Los Angeles or to connect to an existing transit project wholly located in the County of Los Angeles, and provides that these specified procedures are available for the first 7 projects that obtain a certified environmental impact report, as specified. Existing law requires the Judicial Council to adopt rules of court that apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of an environmental impact report for an environmental leadership transit project or the granting of any project approval that require the action or proceeding, including any potential appeals, to be resolved, to the extent feasible, within 365 calendar days of the filing of the certified record of proceedings with the court. Existing law repeals these provisions on January 1, 2026.This bill would, for the applicability of the above-described provisions for environmental leadership transit projects, extend the time period for the approval by the lead agency of the environmental leadership transit project to January 1, 2027. The bill would specify that those provisions also apply if the draft environmental impact report for an environmental leadership transit project is initially circulated before January 1, 2025. The bill would require the resolution of actions or proceeding brought to attack, review, set aside, void, or annul an action or approval of a public agency, including, but not limited to, a responsible agency and a trustee agency, in furtherance of an environmental leadership transit project on the grounds of noncompliance with any law, to be within 365 calendar days of the lodging of the certified record of proceeding, as provided, and would require the Judicial Council, by July 1, 2026, to adopt rules of court to implement this requirement. The bill would extend the operation of these provisions indefinitely. Because the bill would extend the duties of a lead agency in regards to environmental leadership transit project, this bill would impose a state-mandated local program.This bill would declare that its provisions are severable.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would also exempt a transit comprehensive operational analysis, as defined, a transit route readjustment, or other transit agency route addition, elimination, or modification, from the requirements of CEQA. Because a lead agency would be required to determine whether a plan qualifies for this exemption, the bill would impose a state-mandated local program.
CEQA, until January 1, 2030, exempts from its requirements certain transportation-related projects, such as pedestrian and bicycle facilities, transit prioritization projects, public projects located on a site that is wholly within the boundaries of an urbanized area or urban cluster, as provided, for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements.
This bill would extend the operation of the above-mentioned exemption indefinitely. until January 1, 2040. The bill would exempt from the requirements of CEQA a public project for the protection and improvement of bus rapid transit, bus, or light rail service, including the protection, operation, and maintenance, public projects for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, and ferry, and for the protection, maintenance, construction, operation, or rehabilitation of stops that will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. The bill would, until January 1, 2032, exempt from the requirements of CEQA a public project for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, or light rail service, including the protection, maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, or hybrid powertrain vehicles, except as provided. The bill would exclude from this exemption certain public projects for the construction or rehabilitation of a ferry terminal, as provided, and, except as provided, public projects for transit services operated by a transportation network company, as defined. The bill would exempt a project carried out by a public transit agency that is consistent with a specified State Air Resources Board strategy. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law exempts from the requirements of CEQA public projects for the institution or increase of passenger rail service, other than light rail service that is eligible for a specified exemption, including the construction or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains.
This bill would extend the operation of the above-mentioned exemption indefinitely. until January 1, 2040. The bill would exempt from the requirements of CEQA public projects for the improvement of passenger rail service, other than light rail service eligible for a specified exemption, including the maintenance of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains, public projects for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities which will be exclusively used by zero-emission certified Tier 4 or cleaner rolling stock or locomotives, as provided. The bill would, until January 1, 2040, exempt from the requirements of CEQA would exclude from this exemption public projects located in certain air basins for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities that will be used primarily by certified Tier 4 or cleaner rolling stock or locomotives that are not zero-emission rolling stock or locomotives. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law requires certain CEQA-exempt projects exceeding specified dollar amounts to meet certain criteria, as provided.
This bill would instead require certain CEQA-exempt projects that are, based on the project engineers cost estimate, anticipated to exceed a specified dollar amount, to meet certain criteria, as provided. The bill would require the Office of Land Use and Climate Innovation, beginning January 1, 2026, and every two years thereafter, to adjust these amounts to reflect changes in the Consumer Price Index, as provided, and publish the updated amounts on its internet website. The bill would authorize the Office of Land Use and Climate Innovation to implement, interpret, or make specific that provision without taking any regulatory action.
Existing law establishes specified procedures for the environmental review of an environmental leadership transit project, as defined, that is approved by the lead agency on or before January 1, 2025. Existing law requires the environmental leadership transit project to be located wholly within the County of Los Angeles or to connect to an existing transit project wholly located in the County of Los Angeles, and provides that these specified procedures are available for the first 7 projects that obtain a certified environmental impact report, as specified. Existing law requires the Judicial Council to adopt rules of court that apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of an environmental impact report for an environmental leadership transit project or the granting of any project approval that require the action or proceeding, including any potential appeals, to be resolved, to the extent feasible, within 365 calendar days of the filing of the certified record of proceedings with the court. Existing law repeals these provisions on January 1, 2026.
This bill would, for the applicability of the above-described provisions for environmental leadership transit projects, extend the time period for the approval by the lead agency of the environmental leadership transit project to January 1, 2027. The bill would specify that those provisions also apply if the draft environmental impact report for an environmental leadership transit project is initially circulated before January 1, 2025. The bill would require the resolution of actions or proceeding brought to attack, review, set aside, void, or annul an action or approval of a public agency, including, but not limited to, a responsible agency and a trustee agency, in furtherance of an environmental leadership transit project on the grounds of noncompliance with any law, to be within 365 calendar days of the lodging of the certified record of proceeding, as provided, and would require the Judicial Council, by July 1, 2026, to adopt rules of court to implement this requirement. The bill would extend the operation of these provisions indefinitely. Because the bill would extend the duties of a lead agency in regards to environmental leadership transit project, this bill would impose a state-mandated local program.
This bill would declare that its provisions are severable.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would also exempt a transit comprehensive operational analysis, as defined, a transit route readjustment, or other transit agency route addition, elimination, or modification, from the requirements of CEQA. Because a lead agency would be required to determine whether a plan qualifies for this exemption, the bill would impose a state-mandated local program.
CEQA, until January 1, 2030, exempts from its requirements certain transportation-related projects, such as pedestrian and bicycle facilities, transit prioritization projects, public projects located on a site that is wholly within the boundaries of an urbanized area or urban cluster, as provided, for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements.
This bill would extend the operation of the above-mentioned exemption indefinitely and delete the requirement that specific projects be located on a site that is wholly within the boundaries of an urbanized area or urban cluster. indefinitely. The bill would exempt from the requirements of CEQA a public project for the protection and improvement of bus rapid transit, bus, or light rail service, including the operation protection, operation, and maintenance, public projects for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, and ferry, and for the protection, maintenance, construction, operation, or rehabilitation of stops that will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. The bill would, until January 1, 2032, exempt from the requirements of CEQA a public project for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, or light rail service, including the protection, maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, or hybrid powertrain vehicles, except as provided. The bill would exclude from this exemption certain public projects for the construction or rehabilitation of a ferry terminal, as provided, and, except as provided, public projects for transit services operated by a transportation network company, as defined. The bill would exempt a project carried out by a public transit agency conducted in compliance with that is consistent with a specified regulations of the State Air Resources Board relating to commercial harbor craft and in-use locomotives. strategy. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law exempts from the requirements of CEQA public projects for the institution or increase of passenger rail service, other than light rail service that is eligible for a specified exemption, including the construction or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would exempt from the requirements of CEQA public projects for the improvement of passenger rail service, other than light rail service eligible for a specified exemption, including the maintenance of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains, public projects for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities which will be exclusively used by zero-emission certified Tier 4 or cleaner rolling stock or locomotives, as provided. The bill would, until January 1, 2040, exempt from the requirements of CEQA public projects for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities that will be used primarily by certified Tier 4 or cleaner rolling stock or locomotives that are not zero-emission rolling stock or locomotives. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law requires certain CEQA-exempt projects exceeding specified dollar amounts to meet certain criteria, as provided.
This bill would instead require certain CEQA-exempt projects that are, based on the project engineers cost estimate, anticipated to exceed a specified dollar amount, to meet certain criteria, as provided. The bill would require the Office of Land Use and Climate Innovation, beginning January 1, 2026, and every two years thereafter, to adjust these amounts to reflect changes in the Consumer Price Index, as provided, and publish the updated amounts on its internet website. The bill would authorize the Office of Land Use and Climate Innovation to implement, interpret, or make specific that provision without taking any regulatory action.
Existing law establishes specified procedures for the environmental review of an environmental leadership transit project, as defined, that is approved by the lead agency on or before January 1, 2025. Existing law requires the environmental leadership transit project to be located wholly within the County of Los Angeles or to connect to an existing transit project wholly located in the County of Los Angeles, and provides that these specified procedures are available for the first 7 projects that obtain a certified environmental impact report, as specified. Existing law requires the Judicial Council to adopt rules of court that apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of an environmental impact report for an environmental leadership transit project or the granting of any project approval that require the action or proceeding, including any potential appeals, to be resolved, to the extent feasible, within 365 calendar days of the filing of the certified record of proceedings with the court. Existing law repeals these provisions on January 1, 2026.
This bill would, for the applicability of the above-described provisions for environmental leadership transit projects, extend the time period for the approval by the lead agency of the environmental leadership transit project to January 1, 2027. The bill would specify that those provisions also apply if the draft environmental impact report for an environmental leadership transit project is initially circulated before January 1, 2025. The bill would require the resolution of actions or proceeding brought to attack, review, set aside, void, or annul an action or approval of a public agency, including, but not limited to, a responsible agency and a trustee agency, in furtherance of an environmental leadership transit project on the grounds of noncompliance with any law, to be within 365 calendar days of the lodging of the certified record of proceeding, as provided, and would require the Judicial Council, by July 1, 2026, to adopt rules of court to implement this requirement. The bill would extend the operation of these provisions indefinitely. Because the bill would extend the duties of a lead agency in regards to environmental leadership transit project, this bill would impose a state-mandated local program.
This bill would declare that its provisions are severable.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would also exempt a transit comprehensive operational analysis, as defined, a transit route readjustment, or other transit agency route addition, elimination, or modification, from the requirements of CEQA. Because a lead agency would be required to determine whether a plan qualifies for this exemption, the bill would impose a state-mandated local program.
CEQA, until January 1, 2030, exempts from its requirements certain transportation-related projects, such as pedestrian and bicycle facilities, transit prioritization projects, public projects located on a site that is wholly within the boundaries of an urbanized area or urban cluster, as provided, for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements.
This bill would extend the operation of the above-mentioned exemption indefinitely and delete the requirement that specific projects be located on a site that is wholly within the boundaries of an urbanized area or urban cluster. The bill would exempt from the requirements of CEQA a public project for the improvement of bus rapid transit, bus, microtransit, paratransit, passenger rail, or light rail service, including the operation and maintenance, public projects for the improvement, institution, or increase of shuttles and ferries, microtransit, paratransit, shuttle, and ferry, and for the maintenance, construction, operation, or rehabilitation of stops that will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels, or certified Tier 4 or cleaner locomotives, as provided. vessels. The bill would, until January 1, 2040, 2032, exempt from the requirements of CEQA a public project for the improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, passenger rail, or light rail service, including the maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, or hybrid powertrain vehicles, or certified Tier 4 or cleaner locomotives, except as provided. The bill would exclude from this exemption certain public projects for the construction or rehabilitation of a ferry terminal, as provided, and, except as provided, public projects for transit services operated by a transportation network company, as defined. The bill would exempt a project carried out by a public transit agency conducted in compliance with specified regulations of the State Air Resources Board relating to commercial harbor craft and in-use locomotives. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law exempts from the requirements of CEQA public projects for the institution or increase of passenger rail service, other than light rail service that is eligible for a specified exemption, including the construction or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would exempt from the requirements of CEQA public projects for the improvement of passenger rail service, other than light rail service eligible for a specified exemption, including the maintenance of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains, public projects for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities which will be exclusively used by zero-emission certified Tier 4 or cleaner rolling stock or locomotives, as provided. The bill would, until January 1, 2040, exempt from the requirements of CEQA public projects for the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities that will be used primarily by certified Tier 4 or cleaner rolling stock or locomotives that are not zero-emission rolling stock or locomotives. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law requires a certain CEQA-exempt project projects exceeding specified dollar amounts to meet certain criteria, as provided.
This bill would instead require a certain CEQA-exempt project projects that is, are, based on the project engineers cost estimate, anticipated to exceed a specified dollar amount, to meet certain criteria, as provided. The bill would require the Office of Land Use and Climate Innovation, beginning January 1, 2026, and every two years thereafter, to adjust these amounts to reflect changes in the Consumer Price Index, as provided, and publish the updated amounts on its internet website. The bill would authorize the Office of Land Use and Climate Innovation to implement, interpret, or make specific that provision without taking any regulatory action.
Existing law establishes specified procedures for the environmental review of an environmental leadership transit project, as defined, that is approved by the lead agency on or before January 1, 2025. Existing law requires the environmental leadership transit project to be located wholly within the County of Los Angeles or to connect to an existing transit project wholly located in the County of Los Angeles, and provides that these specified procedures are available for the first 7 projects that obtain a certified environmental impact report, as specified. Existing law requires the Judicial Council to adopt rules of court that apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of an environmental impact report for an environmental leadership transit project or the granting of any project approval that require the action or proceeding, including any potential appeals, to be resolved, to the extent feasible, within 365 calendar days of the filing of the certified record of proceedings with the court. Existing law repeals these provisions on January 1, 2026.
This bill would, for the applicability of the above-described provisions for environmental leadership transit projects, extend the time period for the approval by the lead agency of the environmental leadership transit project to January 1, 2027. The bill would specify that those provisions also apply if the draft environmental impact report for an environmental leadership transit project is initially circulated before January 1, 2025. The bill would require the resolution of actions or proceeding brought to attack, review, set aside, void, or annul an action or approval of a public agency, including, but not limited to, a responsible agency and a trustee agency, in furtherance of an environmental leadership transit project on the grounds of noncompliance with any law, to be within 365 calendar days of the lodging of the certified record of proceeding, as provided, and would require the Judicial Council, by July 1, 2026, to adopt rules of court to implement this requirement. The bill would extend the operation of these provisions indefinitely. Because the bill would extend the duties of a lead agency in regards to environmental leadership transit project, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would also exempt a transit comprehensive operational analysis, as defined, a transit route readjustment, or other transit agency route addition, elimination, or modification, from the requirements of CEQA. Because a lead agency would be required to determine whether a plan qualifies for this exemption, the bill would impose a state-mandated local program.
CEQA, until January 1, 2030, exempts from its requirements certain transportation-related projects, such as pedestrian and bicycles bicycle facilities, transit prioritization projects, public projects located on a site that is wholly within the boundaries of an urbanized area or urban cluster, as provided, for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements.
This bill would extend the operation of the above-mentioned exemption indefinitely. indefinitely and delete the requirement that specific projects be located on a site that is wholly within the boundaries of an urbanized area or urban cluster. The bill would exempt from the requirements of CEQA a public project for the improvement of bus rapid transit, bus, microtransit, paratransit, passenger rail, or light rail service, including the operation and maintenance, public projects for the improvement, institution, or increase of shuttles and ferries, and for the maintenance, construction, or rehabilitation of stops that will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels, or certified Tier 4 or cleaner locomotives, as provided. The bill would, until January 1, 2032, 2040, exempt from the requirements of CEQA a public project located on a site that is wholly within the boundaries of an urbanized area or urban cluster, as designated by the United States Census Bureau, for the improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, passenger rail, or light rail service, including the maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. or certified Tier 4 or cleaner locomotives, except as provided. The bill would exclude from this exemption certain public projects for the construction or rehabilitation of a ferry terminal, as provided, certain public projects used by articulated buses, and and, except as provided, public projects for transit services operated by a transportation network company, as defined. The bill would exempt a project carried out by a public transit agency conducted in compliance with specified regulations of the State Air Resources Board relating to commercial harbor craft and in-use locomotives. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law requires a CEQA exempt CEQA-exempt project exceeding specified dollar amounts to meet certain criteria, as provided.
This bill would instead require a CEQA exempt CEQA-exempt project that is, based on the project engineers cost estimate, anticipated to exceed a specified dollar amount, to meet certain criteria, as provided. The bill would require the Office of Land Use and Climate Innovation, beginning January 1, 2026, and every two years thereafter, to adjust these amounts to reflect changes in the California Consumer Price Index, as provided, and publish the updated amounts on its internet website.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would also exempt a transit comprehensive operational analysis, as defined, a transit route readjustment, or other transit agency route addition, elimination, or modification, from the requirements of CEQA. Because a lead agency would be required to determine whether a plan qualifies for this exemption, the bill would impose a state-mandated local program.
CEQA, until January 1, 2030, exempts from its requirements certain transportation-related projects, such as pedestrian and bicycles facilities, transit prioritization projects, public projects for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would exempt from the requirements of CEQA a public project for the improvement of bus rapid transit, bus, microtransit, paratransit, or light rail service, including the operation and maintenance, public projects for the improvement, institution, or increase of shuttles and ferries, and for the maintenance, construction, or rehabilitation of stops that will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels, as provided. The bill would, until January 1, 2032, exempt from the requirements of CEQA a public project located on a site that is wholly within the boundaries of an urbanized area or urban cluster, as designated by the United States Census Bureau, for the improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, or light rail service, including the maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. The bill would exclude from this exemption certain public projects for the construction or rehabilitation of a ferry terminal, as provided. provided, certain public projects used by articulated buses, and public projects for transit services operated by a transportation network company, as defined. The bill would exempt a project carried out by a public transit agency conducted in compliance with specified regulations of the State Air Resources Board relating to commercial harbor craft and in-use locomotives. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law requires a CEQA exempt project exceeding specified dollar amounts to meet certain criteria, as provided.
This bill would instead require a CEQA exempt project that is, based on the project engineers cost estimate, anticipated to exceed a specified dollar amount, to meet certain criteria, as provided. The bill would require the Office of Land Use and Climate Innovation, beginning January 1, 2026, and every two years thereafter, to adjust these amounts to reflect changes in the California Consumer Price Index, and publish the updated amounts on its internet website.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would also exempt a transit comprehensive operational analysis, as defined, a transit route readjustment, or other transit agency route addition, elimination, or modification, from the requirements of CEQA. Because a lead agency would be required to determine whether a plan qualifies for this exemption, the bill would impose a state-mandated local program.
CEQA, until January 1, 2030, exempts from its requirements certain transportation-related projects, such as pedestrian and bicycles facilities, transit prioritization projects, public projects for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would exempt from the requirements of CEQA a public project for the improvement of bus rapid transit, bus, microtransit, paratransit, or light rail service, including the operation and maintenance, public projects for the improvement, institution, or increase of shuttles and ferries, and for the maintenance, construction, or rehabilitation of stops which that will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain buses, shuttles, ferries, or light rail vehicles, rail or cable cars, rolling stock, or vessels, as provided. The bill would exclude from this exemption certain public projects for the construction or rehabilitation of a ferry terminal, as provided. The bill would exempt a project carried out by a public transit agency conducted in compliance with specified regulations of the State Air Resources Board relating to commercial harbor craft and in-use locomotives. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law requires a CEQA exempt project exceeding specified dollar amounts to meet certain criteria, as provided.
This bill would instead require a CEQA exempt project that is, based on the project engineers cost estimate, anticipated to exceed a specified dollar amount, to meet certain criteria, as provided. The bill would require the Office of Land Use and Climate Innovation, beginning January 1, 2026, and every two years thereafter, to adjust these amounts to reflect changes in the California Consumer Price Index, and publish the updated amounts on its internet website.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would also exempt a transit comprehensive operational analysis, as defined, a transit route readjustment, or other transit agency route addition, elimination, or modification, from the requirements of CEQA. Because a lead agency would be required to determine whether a plan qualifies for this exemption, the bill would impose a state-mandated local program.
CEQA, until January 1, 2030, exempts from its requirements certain transportation-related projects, such as pedestrian and bicycles facilities, transit prioritization projects, public projects for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements.
This bill would extend the operation of the above-mentioned exemption indefinitely. The bill would exempt from the requirements of CEQA a public project for the improvement of bus rapid transit, bus, or light rail service, including the maintenance, public projects for the improvement, institution, or increase of shuttles and ferries, and for the maintenance, construction, or rehabilitation of stops which will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain buses, shuttles, ferries, or light rail vehicles, as provided. The bill would exempt a project carried out by a public transit agency conducted in compliance with specified regulations of the State Air Resources Board relating to commercial harbor craft and in-use locomotives. Because a lead agency would be required to determine whether a project qualifies for this exemption, the bill would impose a state-mandated local program.
Existing law requires a CEQA exempt project exceeding specified dollar amounts to meet certain criteria, as provided.
This bill would instead require a CEQA exempt project that is, based on the project engineers cost estimate, anticipated to exceed a specified dollar amount, to meet certain criteria, as provided. The bill would require the Office of Land Use and Climate Innovation, beginning January 1, 2026, and every two years thereafter, to adjust these amounts to reflect changes in the California Consumer Price Index, and publish the updated amounts on its internet website.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(a)(1)(A)This division does not apply to an active transportation plan, a pedestrian plan, or a bicycle transportation plan for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
(B)This division does not apply to a transit comprehensive operational analysis, transit route readjustment, or other transit agency route addition, elimination, or modification.
(2)An active transportation plan or pedestrian plan is encouraged to include the consideration of environmental factors, but that consideration does not inhibit or preclude the application of this section.
(3) An individual project that is a part of an active transportation plan, pedestrian plan, or transit comprehensive operational analysis remains subject to this division unless another exemption applies to that project.
(b)Before determining that a project described in subdivision (a) is exempt pursuant to this section, the lead agency shall hold noticed public hearings in areas affected by the project to hear and respond to public comments. Publication of the notice shall be no fewer times than required by Section 6061 of the Government Code by the public agency in a newspaper of general circulation in the area affected by the proposed project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(c)If a local agency determines that a project is not subject to this division pursuant to this section and it determines to approve or carry out that project, the notice shall be filed with the Office of Land Use and Climate Innovation and the county clerk in the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(d)For purposes of this section, the following definitions apply:
(1)Active transportation plan means a plan developed by a local jurisdiction that promotes and encourages people to choose walking, bicycling, or rolling through the creation of safe, comfortable, connected, and accessible walking, bicycling, or rolling networks, and encourages alternatives to single-occupancy vehicle trips.
(2)Pedestrian plan means a plan developed by a local jurisdiction that establishes a comprehensive, coordinated approach to improving pedestrian infrastructure and safety.
(3)Transit comprehensive operational analysis means a plan that redesigns or modifies a transit operators or local agencys public transit service network, including the routing of fixed route and microtransit services.
SEC. 2.Section 21080.25 of the Public Resources Code is amended to read:21080.25.(a)For purposes of this section, the following definitions apply:
(1)Affordable housing means any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents or sales prices to levels affordable, as defined in Section 50052.5 or 50053 of the Health and Safety Code, to persons and families of moderate, lower, or very low income, as defined in Section 50079.5, 50093, or 50105 of the Health and Safety Code, respectively.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that had been occupied by tenants within five years from the date of approval of the development agreement by a primary tenant who was low income and did not leave voluntarily.
(2)Bicycle facilities includes, but is not limited to, bicycle parking, bicycle sharing facilities, and bikeways as defined in Section 890.4 of the Streets and Highways Code.
(3)High-occupancy vehicle means a vehicle with three or more occupants.
(4)Highway means a way or place of whatever nature, publicly maintained and open to the use of the public for purposes of vehicular travel. Highway includes a street.
(5)Local agency means a public transit operator, city, county, city and county, special district, joint powers authority, local or regional transportation agency, or congestion management agency.
(6)Part-time transit lanes means designated highway shoulders that support the operation of transit vehicles during specified times and are not open to nonpublic transit vehicles at any time.
(7)Project labor agreement has the same meaning as defined in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(8)Public transit operator has the same meaning as operator in Section 99210 of the Public Utilities Code, or means a public entity that provides contracted paratransit services.
(9)Skilled and trained workforce has the same meaning as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(10)Transit lanes means street design elements that delineate space within the roadbed as exclusive to transit use, either full or part time.
(11)Transit prioritization projects means any of the following transit project types on highways or in the public right-of-way:
(A)Signal and sign changes, such as signal coordination, signal timing modifications, signal modifications, or the installation of traffic signs or new signals.
(B)The installation of wayside technology and onboard technology.
(C)The installation of ramp meters.
(D)The conversion to dedicated transit lanes, including transit queue jump or bypass lanes, shared turning lanes and turn restrictions, the narrowing of lanes to allow for dedicated transit lanes or transit reliability improvements, or the widening of existing transit travel lanes by removing or restricting street parking.
(E)Transit stop access and safety improvements, including, but not limited to, the installation of bus shelters, lighting, transit bulbs, and the installation of transit boarding landings and islands.
(12)Transportation demand management program means a specific program of strategies, incentives, and tools to be implemented, including, with specified annual status reporting obligations, to reduce vehicle trips by providing opportunities for the public to choose sustainable travel options, such as transit, bicycle riding, or walking. A specific program of strategies, incentives, and tools includes, but is not limited to, any of the following:
(A)Provision of onsite electric vehicle charging stations in excess of applicable requirements.
(B)Provision of dedicated parking for car share or zero-emission vehicles, or both types of vehicles, in excess of applicable requirements.
(C)Provision of bicycle parking in excess of applicable requirements.
(b)This division does not apply to any of the following projects:
(1)Pedestrian and bicycle facilities that improve safety, access, or mobility, including new facilities, within the public right-of-way.
(2)Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians within the public right-of-way.
(3)Transit prioritization projects.
(4)A project for the designation and conversion of general purpose lanes to high-occupancy vehicle lanes or bus-only lanes, or highway shoulders to part-time transit lanes, for use either during peak congestion hours or all day on highways with existing public transit service or where a public transit agency will be implementing public transit service as identified in a short-range transit plan.
(5)(A)A public project for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, or light rail service, including the protection, maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. The project shall be located entirely within an existing public right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for rail or public mass transit and is wholly within the boundaries of an urbanized area or urban cluster, as designated by the United States Census Bureau.
(B)A public project otherwise identified in subparagraph (A) shall not apply to the exemption pursuant to this paragraph after January 1, 2032, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, or hybrid powertrain vehicles. This subparagraph shall not apply to a public project otherwise identified in subparagraph (A) used by articulated buses.
(C)A public project for the construction or rehabilitation of a ferry terminal that a lead agency has submitted a notice of preparation for an environmental impact report pursuant to Section 21092 before January 1, 2026, shall not apply to the exemption pursuant to this paragraph.
(D)A public project for transit services operated by a transportation network company, as defined in Section 5431 of the Public Utilities Code, shall not apply to the exemption pursuant to this paragraph, unless the services are operated by a microtransit provider contracted by the lead agency that uses a managed fleet of multipassenger vehicles dedicated to that service.
(6)(A)A public project for the improvement, institution, or increase of passenger rail service, other than light rail service eligible under paragraph (5), including the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains or certified Tier 4 or cleaner rolling stock or locomotives, as provided in Section 1033.101 of Title 40 of the Code of Federal Regulations. The project shall be located entirely within an existing rail right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for passenger rail transit.
(B)A public project otherwise identified in subparagraph (A) shall not be eligible for the exemption pursuant to this paragraph if used by certified Tier 4 or cleaner rolling stock or locomotives that are not zero-emission rolling stock or locomotives and the project is located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone.
(7)(A)A public project to construct or maintain infrastructure or facilities to charge, refuel, power, or maintain zero-emission public transit buses, trains, or ferries, provided the project is carried out by a public transit agency and the project is any of the following:
(i)Located on property owned, leased, or operated by the local agency.
(ii)Located within an existing public right-of-way.
(iii)Located on property owned by a public or private utility within an urbanized area.
(B)A lead agency applying an exemption pursuant to this paragraph for hydrogen refueling infrastructure or facilities necessary to refuel or maintain zero-emission public transit buses, trains, or ferries shall comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(8)The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with a project identified in paragraphs (1) to (7), inclusive.
(9)A project that consists exclusively of a combination of any of the components of a project identified in paragraphs (1) to (8), inclusive.
(10)(A)A project that combines a project identified in paragraphs (1) to (8), inclusive, and a housing development project that is either subject to a nondiscretionary approval or is exempt from this division.
(B)This paragraph does not exempt the housing development project described in subparagraph (A) from any other applicable requirements under any other law.
(11)A planning decision carried out by a local agency to reduce or eliminate minimum parking requirements or institute parking maximums, remove or restrict parking, or implement transportation demand management requirements or programs.
(c)Except as provided in subdivision (g), a project exempt from this division under this section shall meet all of the following criteria:
(1)(A)A local agency is carrying out the project and is the lead agency for the project.
(B)The lead agency shall take an action to approve a project as follows:
(i)The lead agencys governing board shall take an action at a public meeting.
(ii)Notwithstanding clause (i), if a lead agency has an alternative project approval process for a project subject to subdivision (b), it may instead follow that alternative process.
(2)The project does not induce single-occupancy vehicle trips, add additional highway lanes, widen highways, or add physical infrastructure or striping to highways except for minor modifications needed for the efficient and safe movement of transit vehicles, bicycles, or high-occupancy vehicles, such as extended merging lanes, shoulder improvements, or improvements to the roadway within the existing right-of-way. The project shall not include the addition of any auxiliary lanes.
(3)The construction of the project shall not require the demolition of affordable housing units.
(d)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed one hundred million dollars ($100,000,000) shall also meet all of the following criteria:
(A)The project is incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review pursuant to this division within 10 years of the approval of the project.
(B)The projects construction impacts are fully mitigated consistent with applicable law.
(C)(i)The lead agency shall complete and consider the results of a project business case and a racial equity analysis. The Office of Land Use and Climate Innovation may set guidelines for the project business case and the racial equity analysis or delegate that authority to metropolitan planning organizations.
(ii)The racial equity analysis required under this subparagraph shall identify the racial equity impacts of the project, identify who will benefit from and be burdened by the project, and, where significant or disproportionate impacts exist, suggest strategies, designs, or actions to mitigate those impacts.
(D)The lead agency shall hold noticed public meetings as follows:
(i)Before determining that a project is exempt pursuant to this section, the lead agency shall hold at least three noticed public meetings in the project area to hear and respond to public comments.
(ii)At least one of the three public meetings shall review the project business case and the racial equity analysis. The review of these documents does not inhibit or preclude application of this section.
(iii)The lead agency shall conduct at least two noticed public meetings annually during project construction for the public to provide comments.
(iv)The public meetings held pursuant to clauses (i) to (iii), inclusive, shall be in the form of either a public community planning meeting held in the project area or in the form of a regularly scheduled meeting of the governing body of the lead agency.
(E)The lead agency shall give public notice of the meetings in subparagraph (D) to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the lead agencys internet website and social media accounts.
(2)In addition to the requirements of paragraph (1), for a project described in that paragraph for which at least 50 percent of the project or projects stops and stations are located in an area that is at risk of residential displacement and that will have a maximum of 15-minute peak headways, the local agency shall complete an analysis of residential displacement and suggest antidisplacement strategies, designs, or actions. For a project subject to this paragraph, the lead agency shall define or identify areas at risk of residential displacement.
(3)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(e)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed fifty million dollars ($50,000,000) shall also comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(2)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(f)(1)(A)Except as provided in subdivision (g), as part of the lead agencys governing board action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), the lead agency shall certify that the project will be completed by a skilled and trained workforce.
(B)Subparagraph (A) does not apply if the lead agency has an existing policy or certification approved by its governing board that requires the use of a skilled and trained workforce to complete the project if the lead agency is a signatory to a project labor agreement that will require the use of a skilled and trained workforce on the project.
(2)(A)Except as provided in subparagraph (B), for a project that is exempted under this section, the lead agency shall not enter into a construction contract with any entity unless the entity provides to the lead agency an enforceable commitment that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or a contract that falls within an apprenticeship occupation in the building and construction trades in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)Subparagraph (A) does not apply if any of the following requirements are met:
(i)The lead agency has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project to use a skilled and trained workforce and the entity has agreed to be bound by that project labor agreement.
(ii)The project or contract is being performed under the extension or renewal of a project labor agreement that was entered into by the lead agency before January 1, 2021.
(iii)The entity contracted to perform the project entered into a project labor agreement that will bind the entity and all its subcontractors at every tier performing the project to use a skilled and trained workforce.
(g)Subdivisions (c) and (f) do not apply to a project described in paragraph (11) of subdivision (b).
(h)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to carry out that project, the lead agency shall file a notice of exemption with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(i)(1)The amendments made to paragraph (5) of subdivision (b) by Chapter 987 of the Statutes of 2022 (Senate Bill 922 of the 202122 Regular Session) may apply to projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023.
(2)For projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023, notwithstanding subdivision (d), as it read on December 31, 2022, the lead agency may certify that the project will be completed by a skilled and trained workforce after the granting of the exemption under this section or the lead agency may demonstrate compliance with subparagraph (B) of paragraph (1) of subdivision (f).
(j)(1)Beginning January 1, 2026, and every two years thereafter, the Office of Land Use and Climate Innovation shall adjust the amounts reflected in paragraph (1) of subdivision (c) and paragraph (1) of subdivision (e) to reflect changes in the Consumer Price Index, as indicated in the Consumer Price Index for All Urban Consumers, as calculated by the Department of Finance based on the United States Bureau of Labor Statistics data for the most recent odd-numbered year, and publish the updated amounts on its internet website.
(2)Notwithstanding the rulemaking provisions of the Administrative Procedure Act (Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code), the Office of Land Use and Climate Innovation may implement, interpret, or make specific this subdivision without taking any regulatory action.
(k)This section shall remain in effect only until January 1, 2040, and as of that date is repealed.
SEC. 3.The provisions of this act are severable. If any provision of this act or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)(1)(A)This division does not apply to an active transportation plan, a pedestrian plan, or a bicycle transportation plan for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
(B)This division does not apply to a transit comprehensive operational analysis, transit route readjustment, or other transit agency route addition, elimination, or modification.
(2)An active transportation plan or pedestrian plan is encouraged to include the consideration of environmental factors, but that consideration does not inhibit or preclude the application of this section.
(3) An individual project that is a part of an active transportation plan, pedestrian plan, or transit comprehensive operational analysis remains subject to this division unless another exemption applies to that project.
(b)Before determining that a project described in subdivision (a) is exempt pursuant to this section, the lead agency shall hold noticed public hearings in areas affected by the project to hear and respond to public comments. Publication of the notice shall be no fewer times than required by Section 6061 of the Government Code by the public agency in a newspaper of general circulation in the area affected by the proposed project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(c)If a local agency determines that a project is not subject to this division pursuant to this section and it determines to approve or carry out that project, the notice shall be filed with the Office of Land Use and Climate Innovation and the county clerk in the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(d)For purposes of this section, the following definitions apply:
(1)Active transportation plan means a plan developed by a local jurisdiction that promotes and encourages people to choose walking, bicycling, or rolling through the creation of safe, comfortable, connected, and accessible walking, bicycling, or rolling networks, and encourages alternatives to single-occupancy vehicle trips.
(2)Pedestrian plan means a plan developed by a local jurisdiction that establishes a comprehensive, coordinated approach to improving pedestrian infrastructure and safety.
(3)Transit comprehensive operational analysis means a plan that redesigns or modifies a transit operators or local agencys public transit service network, including the routing of fixed route and microtransit services.
SEC. 2.Section 21080.25 of the Public Resources Code is amended to read:21080.25.(a)For purposes of this section, the following definitions apply:
(1)Affordable housing means any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents or sales prices to levels affordable, as defined in Section 50052.5 or 50053 of the Health and Safety Code, to persons and families of moderate, lower, or very low income, as defined in Section 50079.5, 50093, or 50105 of the Health and Safety Code, respectively.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that had been occupied by tenants within five years from the date of approval of the development agreement by a primary tenant who was low income and did not leave voluntarily.
(2)Bicycle facilities includes, but is not limited to, bicycle parking, bicycle sharing facilities, and bikeways as defined in Section 890.4 of the Streets and Highways Code.
(3)High-occupancy vehicle means a vehicle with three or more occupants.
(4)Highway means a way or place of whatever nature, publicly maintained and open to the use of the public for purposes of vehicular travel. Highway includes a street.
(5)Local agency means a public transit operator, city, county, city and county, special district, joint powers authority, local or regional transportation agency, or congestion management agency.
(6)Part-time transit lanes means designated highway shoulders that support the operation of transit vehicles during specified times and are not open to nonpublic transit vehicles at any time.
(7)Project labor agreement has the same meaning as defined in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(8)Public transit operator has the same meaning as operator in Section 99210 of the Public Utilities Code, or means a public entity that provides contracted paratransit services.
(9)Skilled and trained workforce has the same meaning as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(10)Transit lanes means street design elements that delineate space within the roadbed as exclusive to transit use, either full or part time.
(11)Transit prioritization projects means any of the following transit project types on highways or in the public right-of-way:
(A)Signal and sign changes, such as signal coordination, signal timing modifications, signal modifications, or the installation of traffic signs or new signals.
(B)The installation of wayside technology and onboard technology.
(C)The installation of ramp meters.
(D)The conversion to dedicated transit lanes, including transit queue jump or bypass lanes, shared turning lanes and turn restrictions, the narrowing of lanes to allow for dedicated transit lanes or transit reliability improvements, or the widening of existing transit travel lanes by removing or restricting street parking.
(E)Transit stop access and safety improvements, including, but not limited to, the installation of bus shelters, lighting, transit bulbs, and the installation of transit boarding landings and islands.
(12)Transportation demand management program means a specific program of strategies, incentives, and tools to be implemented, including, with specified annual status reporting obligations, to reduce vehicle trips by providing opportunities for the public to choose sustainable travel options, such as transit, bicycle riding, or walking. A specific program of strategies, incentives, and tools includes, but is not limited to, any of the following:
(A)Provision of onsite electric vehicle charging stations in excess of applicable requirements.
(B)Provision of dedicated parking for car share or zero-emission vehicles, or both types of vehicles, in excess of applicable requirements.
(C)Provision of bicycle parking in excess of applicable requirements.
(b)This division does not apply to any of the following projects:
(1)Pedestrian and bicycle facilities that improve safety, access, or mobility, including new facilities, within the public right-of-way.
(2)Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians within the public right-of-way.
(3)Transit prioritization projects.
(4)A project for the designation and conversion of general purpose lanes to high-occupancy vehicle lanes or bus-only lanes, or highway shoulders to part-time transit lanes, for use either during peak congestion hours or all day on highways with existing public transit service or where a public transit agency will be implementing public transit service as identified in a short-range transit plan.
(5)(A)A public project for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, or light rail service, including the protection, maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. The project shall be located entirely within an existing public right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for rail or public mass transit and is wholly within the boundaries of an urbanized area or urban cluster, as designated by the United States Census Bureau.
(B)A public project otherwise identified in subparagraph (A) shall not apply to the exemption pursuant to this paragraph after January 1, 2032, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, or hybrid powertrain vehicles. This subparagraph shall not apply to a public project otherwise identified in subparagraph (A) used by articulated buses.
(C)A public project for the construction or rehabilitation of a ferry terminal that a lead agency has submitted a notice of preparation for an environmental impact report pursuant to Section 21092 before January 1, 2026, shall not apply to the exemption pursuant to this paragraph.
(D)A public project for transit services operated by a transportation network company, as defined in Section 5431 of the Public Utilities Code, shall not apply to the exemption pursuant to this paragraph, unless the services are operated by a microtransit provider contracted by the lead agency that uses a managed fleet of multipassenger vehicles dedicated to that service.
(6)(A)A public project for the improvement, institution, or increase of passenger rail service, other than light rail service eligible under paragraph (5), including the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains or certified Tier 4 or cleaner rolling stock or locomotives, as provided in Section 1033.101 of Title 40 of the Code of Federal Regulations. The project shall be located entirely within an existing rail right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for passenger rail transit.
(B)A public project otherwise identified in subparagraph (A) shall not be eligible for the exemption pursuant to this paragraph if used by certified Tier 4 or cleaner rolling stock or locomotives that are not zero-emission rolling stock or locomotives and the project is located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone.
(7)(A)A public project to construct or maintain infrastructure or facilities to charge, refuel, power, or maintain zero-emission public transit buses, trains, or ferries, provided the project is carried out by a public transit agency and the project is any of the following:
(i)Located on property owned, leased, or operated by the local agency.
(ii)Located within an existing public right-of-way.
(iii)Located on property owned by a public or private utility within an urbanized area.
(B)A lead agency applying an exemption pursuant to this paragraph for hydrogen refueling infrastructure or facilities necessary to refuel or maintain zero-emission public transit buses, trains, or ferries shall comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(8)The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with a project identified in paragraphs (1) to (7), inclusive.
(9)A project that consists exclusively of a combination of any of the components of a project identified in paragraphs (1) to (8), inclusive.
(10)(A)A project that combines a project identified in paragraphs (1) to (8), inclusive, and a housing development project that is either subject to a nondiscretionary approval or is exempt from this division.
(B)This paragraph does not exempt the housing development project described in subparagraph (A) from any other applicable requirements under any other law.
(11)A planning decision carried out by a local agency to reduce or eliminate minimum parking requirements or institute parking maximums, remove or restrict parking, or implement transportation demand management requirements or programs.
(c)Except as provided in subdivision (g), a project exempt from this division under this section shall meet all of the following criteria:
(1)(A)A local agency is carrying out the project and is the lead agency for the project.
(B)The lead agency shall take an action to approve a project as follows:
(i)The lead agencys governing board shall take an action at a public meeting.
(ii)Notwithstanding clause (i), if a lead agency has an alternative project approval process for a project subject to subdivision (b), it may instead follow that alternative process.
(2)The project does not induce single-occupancy vehicle trips, add additional highway lanes, widen highways, or add physical infrastructure or striping to highways except for minor modifications needed for the efficient and safe movement of transit vehicles, bicycles, or high-occupancy vehicles, such as extended merging lanes, shoulder improvements, or improvements to the roadway within the existing right-of-way. The project shall not include the addition of any auxiliary lanes.
(3)The construction of the project shall not require the demolition of affordable housing units.
(d)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed one hundred million dollars ($100,000,000) shall also meet all of the following criteria:
(A)The project is incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review pursuant to this division within 10 years of the approval of the project.
(B)The projects construction impacts are fully mitigated consistent with applicable law.
(C)(i)The lead agency shall complete and consider the results of a project business case and a racial equity analysis. The Office of Land Use and Climate Innovation may set guidelines for the project business case and the racial equity analysis or delegate that authority to metropolitan planning organizations.
(ii)The racial equity analysis required under this subparagraph shall identify the racial equity impacts of the project, identify who will benefit from and be burdened by the project, and, where significant or disproportionate impacts exist, suggest strategies, designs, or actions to mitigate those impacts.
(D)The lead agency shall hold noticed public meetings as follows:
(i)Before determining that a project is exempt pursuant to this section, the lead agency shall hold at least three noticed public meetings in the project area to hear and respond to public comments.
(ii)At least one of the three public meetings shall review the project business case and the racial equity analysis. The review of these documents does not inhibit or preclude application of this section.
(iii)The lead agency shall conduct at least two noticed public meetings annually during project construction for the public to provide comments.
(iv)The public meetings held pursuant to clauses (i) to (iii), inclusive, shall be in the form of either a public community planning meeting held in the project area or in the form of a regularly scheduled meeting of the governing body of the lead agency.
(E)The lead agency shall give public notice of the meetings in subparagraph (D) to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the lead agencys internet website and social media accounts.
(2)In addition to the requirements of paragraph (1), for a project described in that paragraph for which at least 50 percent of the project or projects stops and stations are located in an area that is at risk of residential displacement and that will have a maximum of 15-minute peak headways, the local agency shall complete an analysis of residential displacement and suggest antidisplacement strategies, designs, or actions. For a project subject to this paragraph, the lead agency shall define or identify areas at risk of residential displacement.
(3)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(e)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed fifty million dollars ($50,000,000) shall also comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(2)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(f)(1)(A)Except as provided in subdivision (g), as part of the lead agencys governing board action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), the lead agency shall certify that the project will be completed by a skilled and trained workforce.
(B)Subparagraph (A) does not apply if the lead agency has an existing policy or certification approved by its governing board that requires the use of a skilled and trained workforce to complete the project if the lead agency is a signatory to a project labor agreement that will require the use of a skilled and trained workforce on the project.
(2)(A)Except as provided in subparagraph (B), for a project that is exempted under this section, the lead agency shall not enter into a construction contract with any entity unless the entity provides to the lead agency an enforceable commitment that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or a contract that falls within an apprenticeship occupation in the building and construction trades in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)Subparagraph (A) does not apply if any of the following requirements are met:
(i)The lead agency has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project to use a skilled and trained workforce and the entity has agreed to be bound by that project labor agreement.
(ii)The project or contract is being performed under the extension or renewal of a project labor agreement that was entered into by the lead agency before January 1, 2021.
(iii)The entity contracted to perform the project entered into a project labor agreement that will bind the entity and all its subcontractors at every tier performing the project to use a skilled and trained workforce.
(g)Subdivisions (c) and (f) do not apply to a project described in paragraph (11) of subdivision (b).
(h)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to carry out that project, the lead agency shall file a notice of exemption with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(i)(1)The amendments made to paragraph (5) of subdivision (b) by Chapter 987 of the Statutes of 2022 (Senate Bill 922 of the 202122 Regular Session) may apply to projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023.
(2)For projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023, notwithstanding subdivision (d), as it read on December 31, 2022, the lead agency may certify that the project will be completed by a skilled and trained workforce after the granting of the exemption under this section or the lead agency may demonstrate compliance with subparagraph (B) of paragraph (1) of subdivision (f).
(j)(1)Beginning January 1, 2026, and every two years thereafter, the Office of Land Use and Climate Innovation shall adjust the amounts reflected in paragraph (1) of subdivision (c) and paragraph (1) of subdivision (e) to reflect changes in the Consumer Price Index, as indicated in the Consumer Price Index for All Urban Consumers, as calculated by the Department of Finance based on the United States Bureau of Labor Statistics data for the most recent odd-numbered year, and publish the updated amounts on its internet website.
(2)Notwithstanding the rulemaking provisions of the Administrative Procedure Act (Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code), the Office of Land Use and Climate Innovation may implement, interpret, or make specific this subdivision without taking any regulatory action.
(k)This section shall remain in effect only until January 1, 2040, and as of that date is repealed.
SEC. 3.The provisions of this act are severable. If any provision of this act or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)(1)(A)This division does not apply to an active transportation plan, a pedestrian plan, or a bicycle transportation plan for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
(B)This division does not apply to a transit comprehensive operational analysis, transit route readjustment, or other transit agency route addition, elimination, or modification.
(2)An active transportation plan or pedestrian plan is encouraged to include the consideration of environmental factors, but that consideration does not inhibit or preclude the application of this section.
(3) An individual project that is a part of an active transportation plan, pedestrian plan, or transit comprehensive operational analysis remains subject to this division unless another exemption applies to that project.
(b)Before determining that a project described in subdivision (a) is exempt pursuant to this section, the lead agency shall hold noticed public hearings in areas affected by the project to hear and respond to public comments. Publication of the notice shall be no fewer times than required by Section 6061 of the Government Code by the public agency in a newspaper of general circulation in the area affected by the proposed project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(c)If a local agency determines that a project is not subject to this division pursuant to this section and it determines to approve or carry out that project, the notice shall be filed with the Office of Land Use and Climate Innovation and the county clerk in the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(d)For purposes of this section, the following definitions apply:
(1)Active transportation plan means a plan developed by a local jurisdiction that promotes and encourages people to choose walking, bicycling, or rolling through the creation of safe, comfortable, connected, and accessible walking, bicycling, or rolling networks, and encourages alternatives to single-occupancy vehicle trips.
(2)Pedestrian plan means a plan developed by a local jurisdiction that establishes a comprehensive, coordinated approach to improving pedestrian infrastructure and safety.
(3)Transit comprehensive operational analysis means a plan that redesigns or modifies a transit operators or local agencys public transit service network, including the routing of fixed route and microtransit services.
SEC. 2.Section 21080.25 of the Public Resources Code is amended to read:21080.25.(a)For purposes of this section, the following definitions apply:
(1)Affordable housing means any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents or sales prices to levels affordable, as defined in Section 50052.5 or 50053 of the Health and Safety Code, to persons and families of moderate, lower, or very low income, as defined in Section 50079.5, 50093, or 50105 of the Health and Safety Code, respectively.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that had been occupied by tenants within five years from the date of approval of the development agreement by a primary tenant who was low income and did not leave voluntarily.
(2)Bicycle facilities includes, but is not limited to, bicycle parking, bicycle sharing facilities, and bikeways as defined in Section 890.4 of the Streets and Highways Code.
(3)High-occupancy vehicle means a vehicle with three or more occupants.
(4)Highway means a way or place of whatever nature, publicly maintained and open to the use of the public for purposes of vehicular travel. Highway includes a street.
(5)Local agency means a public transit operator, city, county, city and county, special district, joint powers authority, local or regional transportation agency, or congestion management agency.
(6)Part-time transit lanes means designated highway shoulders that support the operation of transit vehicles during specified times and are not open to nonpublic transit vehicles at any time.
(7)Project labor agreement has the same meaning as defined in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(8)Public transit operator has the same meaning as operator in Section 99210 of the Public Utilities Code, or means a public entity that provides contracted paratransit services.
(9)Skilled and trained workforce has the same meaning as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(10)Transit lanes means street design elements that delineate space within the roadbed as exclusive to transit use, either full or part time.
(11)Transit prioritization projects means any of the following transit project types on highways or in the public right-of-way:
(A)Signal and sign changes, such as signal coordination, signal timing modifications, signal modifications, or the installation of traffic signs or new signals.
(B)The installation of wayside technology and onboard technology.
(C)The installation of ramp meters.
(D)The conversion to dedicated transit lanes, including transit queue jump or bypass lanes, shared turning lanes and turn restrictions, the narrowing of lanes to allow for dedicated transit lanes or transit reliability improvements, or the widening of existing transit travel lanes by removing or restricting street parking.
(E)Transit stop access and safety improvements, including, but not limited to, the installation of bus shelters, lighting, transit bulbs, and the installation of transit boarding landings and islands.
(12)Transportation demand management program means a specific program of strategies, incentives, and tools to be implemented, including, with specified annual status reporting obligations, to reduce vehicle trips by providing opportunities for the public to choose sustainable travel options, such as transit, bicycle riding, or walking. A specific program of strategies, incentives, and tools includes, but is not limited to, any of the following:
(A)Provision of onsite electric vehicle charging stations in excess of applicable requirements.
(B)Provision of dedicated parking for car share or zero-emission vehicles, or both types of vehicles, in excess of applicable requirements.
(C)Provision of bicycle parking in excess of applicable requirements.
(b)This division does not apply to any of the following projects:
(1)Pedestrian and bicycle facilities that improve safety, access, or mobility, including new facilities, within the public right-of-way.
(2)Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians within the public right-of-way.
(3)Transit prioritization projects.
(4)A project for the designation and conversion of general purpose lanes to high-occupancy vehicle lanes or bus-only lanes, or highway shoulders to part-time transit lanes, for use either during peak congestion hours or all day on highways with existing public transit service or where a public transit agency will be implementing public transit service as identified in a short-range transit plan.
(5)(A)A public project for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, or light rail service, including the protection, maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. The project shall be located entirely within an existing public right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for rail or public mass transit and is wholly within the boundaries of an urbanized area or urban cluster, as designated by the United States Census Bureau.
(B)A public project otherwise identified in subparagraph (A) shall not apply to the exemption pursuant to this paragraph after January 1, 2032, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, or hybrid powertrain vehicles. This subparagraph shall not apply to a public project otherwise identified in subparagraph (A) used by articulated buses.
(C)A public project for the construction or rehabilitation of a ferry terminal that a lead agency has submitted a notice of preparation for an environmental impact report pursuant to Section 21092 before January 1, 2026, shall not apply to the exemption pursuant to this paragraph.
(D)A public project for transit services operated by a transportation network company, as defined in Section 5431 of the Public Utilities Code, shall not apply to the exemption pursuant to this paragraph, unless the services are operated by a microtransit provider contracted by the lead agency that uses a managed fleet of multipassenger vehicles dedicated to that service.
(6)(A)A public project for the improvement, institution, or increase of passenger rail service, other than light rail service eligible under paragraph (5), including the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains or certified Tier 4 or cleaner rolling stock or locomotives, as provided in Section 1033.101 of Title 40 of the Code of Federal Regulations. The project shall be located entirely within an existing rail right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for passenger rail transit.
(B)A public project otherwise identified in subparagraph (A) shall not be eligible for the exemption pursuant to this paragraph if used by certified Tier 4 or cleaner rolling stock or locomotives that are not zero-emission rolling stock or locomotives and the project is located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone.
(7)(A)A public project to construct or maintain infrastructure or facilities to charge, refuel, power, or maintain zero-emission public transit buses, trains, or ferries, provided the project is carried out by a public transit agency and the project is any of the following:
(i)Located on property owned, leased, or operated by the local agency.
(ii)Located within an existing public right-of-way.
(iii)Located on property owned by a public or private utility within an urbanized area.
(B)A lead agency applying an exemption pursuant to this paragraph for hydrogen refueling infrastructure or facilities necessary to refuel or maintain zero-emission public transit buses, trains, or ferries shall comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(8)The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with a project identified in paragraphs (1) to (7), inclusive.
(9)A project that consists exclusively of a combination of any of the components of a project identified in paragraphs (1) to (8), inclusive.
(10)(A)A project that combines a project identified in paragraphs (1) to (8), inclusive, and a housing development project that is either subject to a nondiscretionary approval or is exempt from this division.
(B)This paragraph does not exempt the housing development project described in subparagraph (A) from any other applicable requirements under any other law.
(10)(11)A planning decision carried out by a local agency to reduce or eliminate minimum parking requirements or institute parking maximums, remove or restrict parking, or implement transportation demand management requirements or programs.
(c)Except as provided in subdivision (g), a project exempt from this division under this section shall meet all of the following criteria:
(1)(A)A local agency is carrying out the project and is the lead agency for the project.
(B)The lead agency shall take an action to approve a project as follows:
(i)The lead agencys governing board shall take an action at a public meeting.
(ii)Notwithstanding clause (i), if a lead agency has an alternative project approval process for a project subject to subdivision (b), it may instead follow that alternative process.
(2)The project does not induce single-occupancy vehicle trips, add additional highway lanes, widen highways, or add physical infrastructure or striping to highways except for minor modifications needed for the efficient and safe movement of transit vehicles, bicycles, or high-occupancy vehicles, such as extended merging lanes, shoulder improvements, or improvements to the roadway within the existing right-of-way. The project shall not include the addition of any auxiliary lanes.
(3)The construction of the project shall not require the demolition of affordable housing units.
(d)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed one hundred million dollars ($100,000,000) shall also meet all of the following criteria:
(A)The project is incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review pursuant to this division within 10 years of the approval of the project.
(B)The projects construction impacts are fully mitigated consistent with applicable law.
(C)(i)The lead agency shall complete and consider the results of a project business case and a racial equity analysis. The Office of Land Use and Climate Innovation may set guidelines for the project business case and the racial equity analysis or delegate that authority to metropolitan planning organizations.
(ii)The racial equity analysis required under this subparagraph shall identify the racial equity impacts of the project, identify who will benefit from and be burdened by the project, and, where significant or disproportionate impacts exist, suggest strategies, designs, or actions to mitigate those impacts.
(D)The lead agency shall hold noticed public meetings as follows:
(i)Before determining that a project is exempt pursuant to this section, the lead agency shall hold at least three noticed public meetings in the project area to hear and respond to public comments.
(ii)At least one of the three public meetings shall review the project business case and the racial equity analysis. The review of these documents does not inhibit or preclude application of this section.
(iii)The lead agency shall conduct at least two noticed public meetings annually during project construction for the public to provide comments.
(iv)The public meetings held pursuant to clauses (i) to (iii), inclusive, shall be in the form of either a public community planning meeting held in the project area or in the form of a regularly scheduled meeting of the governing body of the lead agency.
(E)The lead agency shall give public notice of the meetings in subparagraph (D) to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the lead agencys internet website and social media accounts.
(2)In addition to the requirements of paragraph (1), for a project described in that paragraph for which at least 50 percent of the project or projects stops and stations are located in an area that is at risk of residential displacement and that will have a maximum of 15-minute peak headways, the local agency shall complete an analysis of residential displacement and suggest antidisplacement strategies, designs, or actions. For a project subject to this paragraph, the lead agency shall define or identify areas at risk of residential displacement.
(3)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(e)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed fifty million dollars ($50,000,000) shall also comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(2)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(f)(1)(A)Except as provided in subdivision (g), as part of the lead agencys governing board action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), the lead agency shall certify that the project will be completed by a skilled and trained workforce.
(B)Subparagraph (A) does not apply if the lead agency has an existing policy or certification approved by its governing board that requires the use of a skilled and trained workforce to complete the project if the lead agency is a signatory to a project labor agreement that will require the use of a skilled and trained workforce on the project.
(2)(A)Except as provided in subparagraph (B), for a project that is exempted under this section, the lead agency shall not enter into a construction contract with any entity unless the entity provides to the lead agency an enforceable commitment that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or a contract that falls within an apprenticeship occupation in the building and construction trades in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)Subparagraph (A) does not apply if any of the following requirements are met:
(i)The lead agency has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project to use a skilled and trained workforce and the entity has agreed to be bound by that project labor agreement.
(ii)The project or contract is being performed under the extension or renewal of a project labor agreement that was entered into by the lead agency before January 1, 2021.
(iii)The entity contracted to perform the project entered into a project labor agreement that will bind the entity and all its subcontractors at every tier performing the project to use a skilled and trained workforce.
(g)Subdivisions (c) and (f) do not apply to a project described in paragraph (10) (11) of subdivision (b).
(h)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to carry out that project, the lead agency shall file a notice of exemption with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(i)(1)The amendments made to paragraph (5) of subdivision (b) by Chapter 987 of the Statutes of 2022 (Senate Bill 922 of the 202122 Regular Session) may apply to projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023.
(2)For projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023, notwithstanding subdivision (d), as it read on December 31, 2022, the lead agency may certify that the project will be completed by a skilled and trained workforce after the granting of the exemption under this section or the lead agency may demonstrate compliance with subparagraph (B) of paragraph (1) of subdivision (f).
(j)(1)Beginning January 1, 2026, and every two years thereafter, the Office of Land Use and Climate Innovation shall adjust the amounts reflected in paragraph (1) of subdivision (c) and paragraph (1) of subdivision (e) to reflect changes in the Consumer Price Index, as indicated in the Consumer Price Index for All Urban Consumers, as calculated by the Department of Finance based on the United States Bureau of Labor Statistics data for the most recent odd-numbered year, and publish the updated amounts on its internet website.
(2)Notwithstanding the rulemaking provisions of the Administrative Procedure Act (Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code), the Office of Land Use and Climate Innovation may implement, interpret, or make specific this subdivision without taking any regulatory action.
(k)This section shall remain in effect only until January 1, 2040, and as of that date is repealed.
SEC. 3.Section 21168.6.9 of the Public Resources Code is amended to read:21168.6.9.(a)For purposes of this section, the following definitions apply:(1)Environmental leadership transit project or project means a project to construct a fixed guideway and related fixed facilities that meets all of the following conditions:(A)The fixed guideway operates at zero emissions.(B)(i)If the project is more than two miles in length, the project reduces emissions by no less than 400,000 metric tons of greenhouse gases directly in the corridor of the project defined in the applicable environmental document over the useful life of the project, without using offsets.(ii)If the project is no more than two miles in length, the project reduces emissions by no less than 50,000 metric tons of greenhouse gases directly in the corridor of the project defined in the applicable environmental document over the useful life of the project, without using offsets.(C)The project reduces no less than 30,000,000 vehicle miles traveled in the corridor of the project defined in the applicable environmental document over the useful life of the project.(D)The project is consistent with the applicable sustainable communities strategy or alternative planning strategy.(E)The project is consistent with the applicable regional transportation plan.(F)The project applicant demonstrates how it has incorporated sustainable infrastructure practices to achieve sustainability, resiliency, and climate change mitigation and adaptation goals in the project, including principles, frameworks, or guidelines as recommended by one or more of the following:(i)The sustainability, resiliency, and climate change policies and standards of the American Society of Civil Engineers.(ii)The Envision Rating System of the Institute for Sustainable Infrastructure.(iii)The Leadership in Energy and Environment Design (LEED) rating system of the United States Green Building Council.(G)The environmental leadership transit project is located wholly within the County of Los Angeles or connects to an existing transit project wholly located in the County of Los Angeles.(H)For a project meeting the requirements of subparagraphs (A) to (G), inclusive, for which the environmental review pursuant to this division has commenced before January 1, 2022, the project applicant demonstrates that the record of proceedings is being, or has been, prepared in accordance with subdivision (f).(2)Fixed guideway has the same meaning as defined in Section 5302 of Title 49 of the United States Code.(3)Project applicant means a public or private entity or its affiliates that proposes an environmental leadership transit project, and its successors, heirs, and assignees.(4)Project labor agreement has the same meaning as in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.(5)Skilled and trained workforce has the same meaning as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.(b)This section applies to an environmental leadership transit project if the project applicant does all of the following:(1)The project applicant demonstrates compliance with the requirements of Chapter 12.8 (commencing with Section 42649) and Chapter 12.9 (commencing with Section 42649.8) of Part 3 of Division 30, as applicable.(2)(A)Except as provided in subparagraph (B), the project applicant has entered into a binding and enforceable agreement that all mitigation measures required under this division shall be conditions of approval of the project, and those conditions will be fully enforceable by the lead agency or another agency designated by the lead agency. In the case of environmental mitigation measures, the project applicant agrees, as an ongoing obligation, that those measures will be monitored and enforced by the lead agency for the life of the obligation.(B)For a project applicant that is a public agency and is also the lead agency, the public agency conditions the approval of the environmental leadership transit project on, and performs, all mitigation measures required under this division. In the case of environmental mitigation measures, the public agency, as an ongoing obligation, shall monitor those measures for the life of the obligation.(3)The project applicant agrees to pay the costs of the trial court and the court of appeal in hearing and deciding any case challenging a lead agencys action on an environmental leadership transit project under this division, including payment of the costs for the appointment of a special master if deemed appropriate by the court, in a form and manner specified by the Judicial Council, as provided in the California Rules of Court adopted by the Judicial Council under subdivision (d).(4)The project applicant agrees to bear the costs of preparing the record of proceedings for the project concurrent with review and consideration of the project under this division, in a form and manner specified by the lead agency for the project.(c)(1)(A)If the project applicant is a public agency, the project applicant of an environmental leadership transit project shall obtain an enforceable commitment that any bidder, contractor, or other entity undertaking the project will use a skilled and trained workforce to complete the project.(B)Subparagraph (A) does not apply if either of the following is met:(i)The project applicant has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project to use a skilled and trained workforce.(ii)The bidder, contractor, or other entity has entered into a project labor agreement that will bind all contractors and subcontractors at every tier performing work on the project to use a skilled and trained workforce.(2)If the project applicant is a private entity, the project applicant of an environmental leadership transit project shall do both of the following:(A)Certify to the lead agency that either of the following is true:(i)The entirety of the project is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.(ii)If the project is not in its entirety a public work and the project applicant is not required to pay prevailing wages to all construction workers under Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code, all construction workers employed on construction of the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the project is subject to this clause, then for those portions of the project that are not a public work all of the following shall apply:(I)The project applicant shall ensure that the prevailing wage requirement is included in all contracts for the performance of all construction work.(II)All contractors and subcontractors at every tier shall pay to all construction workers employed in the execution of the work at least the general prevailing rate of per diem wages, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.(III)Except as provided in subclause (V), all contractors and subcontractors at every tier shall maintain and verify payroll records pursuant to Section 1776 of the Labor Code and make those records available for inspection and copying as provided by that section.(IV)Except as provided in subclause (V), the obligation of the contractors and subcontractors at every tier to pay prevailing wages may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of the project, or by an underpaid worker through an administrative complaint or civil action, or by a joint labor-management committee through a civil action under Section 1771.2 of the Labor Code. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond or bonds issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.(V)Subclauses (III) and (IV) do not apply if all contractors and subcontractors at every tier performing work on the project are subject to a project labor agreement that requires the payment of prevailing wages to all construction workers employed in the execution of the project and provides for enforcement of that obligation through an arbitration procedure.(VI)Notwithstanding subdivision (c) of Section 1773.1 of the Labor Code, the requirement that employer payments not reduce the obligation to pay the hourly straight time or overtime wages found to be prevailing shall not apply if otherwise provided in a bona fide collective bargaining agreement covering the worker. The requirement to pay at least the general prevailing rate of per diem wages does not preclude use of an alternative workweek schedule adopted pursuant to Section 511 or 514 of the Labor Code.(B)Certify to the lead agency that a skilled and trained workforce will be used to perform all construction work on the project. All of the following requirements shall apply to the project:(i)The project applicant shall require in all contracts for the performance of work that every contractor and subcontractor at every tier will individually use a skilled and trained workforce to construct the project.(ii)Every contractor and subcontractor at every tier shall use a skilled and trained workforce to construct the project.(iii)(I)Except as provided in subclause (II), the project applicant shall provide to the lead agency, on a monthly basis while the project or contract is being performed, a report demonstrating compliance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code. A monthly report provided to the lead agency pursuant to this subclause shall be a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code) and shall be open to public inspection. A project applicant that fails to provide a monthly report demonstrating compliance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code shall be subject to a civil penalty of ten thousand dollars ($10,000) per month for each month for which the report has not been provided. Any contractor or subcontractor that fails to use a skilled and trained workforce shall be subject to a civil penalty of two hundred dollars ($200) per calendar day for each worker employed in contravention of the skilled and trained workforce requirement. Penalties may be assessed by the Labor Commissioner within 18 months of completion of the project using the same procedures for issuance of civil wage and penalty assessments pursuant to Section 1741 of the Labor Code, and may be reviewed pursuant to the same procedures in Section 1742 of the Labor Code. Penalties shall be paid to the State Public Works Enforcement Fund.(II)Subclause (I) shall not apply if all contractors and subcontractors at every tier performing work on the project are subject to a project labor agreement that requires compliance with the skilled and trained workforce requirement and provides for enforcement of that obligation through an arbitration procedure.(d)(1)On or before January 1, 2023, the Judicial Council shall adopt rules of court that apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of an environmental impact report for an environmental leadership transit project or the granting of any project approval that require the action or proceeding, including any potential appeals to the court of appeal or the Supreme Court, to be resolved, to the extent feasible, within 365 calendar days of the filing of the certified record of proceedings with the court.(2)(A)An action or proceeding brought to attack, review, set aside, void, or annul an action or approval of a public agency, including, but not limited to, a responsible agency and a trustee agency, in furtherance of an environmental leadership transit project on the grounds of noncompliance with any law, including any potential appeals to the court of appeal or the Supreme Court, shall be resolved, to the extent feasible, within 365 calendar days of the filing of the certified record of proceedings for the challenged action or approval. On or before July 1, 2026, the Judicial Council shall adopt rules of court to implement this subparagraph.(B)Before the adoption of the rule of court pursuant to subparagraph (A), the following apply to actions or proceedings subject to this paragraph:(i)The respondent public agency shall lodge with the court the certified record of proceedings in electronic form within 10 days of the service of the action or proceeding.(ii)(I)Except as provided in subclause (II), the petitioner shall file and serve its opening brief within 45 days of the lodging of the certified record of proceedings.(II)If the petitioner filed and served the petition within 10 days of the commencement of the relevant limitation period for the action or proceeding, the opening brief shall be filed and served within 55 days of the lodging of the certified record of proceeding.(iii)The hearing on the merits shall be held, to the extent feasible, within 100 days of the lodging of the certified record of proceedings. This time period may be extended by stipulation of the parties.(iv)To the extent not inconsistent with clauses (i) to (iii), inclusive, Division 22 (commencing with Rule 3.2200) of Title 3 of, and Chapter 1 (commencing with Rule 8.700) of Division 3 of Title 8 of, the California Rules of Court shall apply to actions and proceedings subject to this paragraph.(C)For an action or proceeding brought, in calendar year 2025, against an environmental leadership transit project approved in that calendar year, this paragraph shall apply to the maximum extent feasible.(e)(1)(A)The draft and final environmental impact report for an environmental leadership transit project shall include a notice in not less than 12-point type stating the following:THIS ENVIRONMENTAL IMPACT REPORT IS SUBJECT TO SECTION 21168.6.9 OF THE PUBLIC RESOURCES CODE, WHICH PROVIDES, AMONG OTHER THINGS, THAT THE LEAD AGENCY NEED NOT CONSIDER CERTAIN COMMENTS FILED AFTER THE CLOSE OF THE PUBLIC COMMENT PERIOD, IF ANY, FOR THE DRAFT ENVIRONMENTAL IMPACT REPORT. ANY JUDICIAL ACTION CHALLENGING THE CERTIFICATION OR ADOPTION OF THE ENVIRONMENTAL IMPACT REPORT OR THE APPROVAL OF THE PROJECT DESCRIBED IN SECTION 21168.6.9 OF THE PUBLIC RESOURCES CODE IS SUBJECT TO THE PROCEDURES SET FORTH IN THAT SECTION. A COPY OF SECTION 21168.6.9 OF THE PUBLIC RESOURCES CODE IS INCLUDED IN THE APPENDIX TO THIS ENVIRONMENTAL IMPACT REPORT. (B)For an environmental leadership transit project for which a draft environmental impact report was issued before January 1, 2022, the lead agency shall, before February 1, 2022, or before the public hearing on the certification of the environmental impact report, whichever is earlier, provide the notice specified in subparagraph (A), in writing, to all parties that have requested notification regarding the project. The lead agency shall include that notice and the appendix required pursuant to paragraph (2) in the final environmental impact report for the project.(C)For an environmental leadership transit project for which a final environmental impact report was issued before January 1, 2022, the lead agency shall, before February 1, 2022, or before the issuance of the notice of determination, whichever is earlier, do both of the following:(i)Issue an addendum to the final environmental impact report containing the notice specified in subparagraph (A) and the appendix required pursuant to paragraph (2).(ii)Provide notice, in writing, of the addendum to all parties that have requested notification regarding the project.(2)The draft environmental impact report and final environmental impact report shall contain, as an appendix, the full text of this section.(3)Within 10 calendar days after the release of the draft environmental impact report, the lead agency shall conduct an informational workshop to inform the public of the key analyses and conclusions of that document, as applicable.(4)Within 10 calendar days before the close of the public comment period, the lead agency shall hold a public hearing to receive testimony on the draft environmental impact report. A transcript of the hearing shall be included as an appendix to the final environmental impact report, as applicable.(5)(A)Within five calendar days following the close of the public comment period, a commenter on the draft environmental impact report may submit to the lead agency a written request for nonbinding mediation, as applicable. The lead agency shall participate in nonbinding mediation with all commenters who submitted timely comments on the draft environmental impact report and who requested the mediation. Mediation conducted pursuant to this paragraph shall end no later than 35 calendar days after the close of the public comment period.(B)A request for mediation shall identify all areas of dispute raised in the comment submitted by the commenter that are to be mediated.(C)The lead agency shall select one or more mediators who shall be retired judges or recognized experts with at least five years experience in land use and environmental law or science, or mediation. The lead agency shall bear the costs of mediation.(D)A mediation session shall be conducted on each area of dispute with the parties requesting mediation on that area of dispute.(E)The lead agency shall adopt, as a condition of approval, any measures agreed upon by the lead agency and any commenter who requested mediation. A commenter who agrees to a measure pursuant to this subparagraph shall not raise the issue addressed by that measure as a basis for an action or proceeding challenging the lead agencys decision to certify the environmental impact report or to grant project approval.(6)The lead agency need not consider written comments on the draft environmental impact report submitted after the close of the public comment period, unless those comments address any of the following:(A)New issues raised in the response to comments by the lead agency.(B)New information released by the lead agency subsequent to the release of the draft environmental impact report, such as new information set forth or embodied in a staff report, proposed permit, proposed resolution, ordinance, or similar documents.(C)Changes made to the project after the close of the public comment period.(D)Proposed conditions for approval, mitigation measures, or proposed findings required by Section 21081 or a proposed reporting or monitoring program required by paragraph (1) of subdivision (a) of Section 21081.6, if the lead agency releases those documents subsequent to the release of the draft environmental impact report.(E)New information that was not reasonably known and could not have been reasonably known during the public comment period.(7)The lead agency shall file the notice required by subdivision (a) of Section 21152 within five calendar days after the last initial project approval.(f)(1)The lead agency shall prepare and certify the record of proceedings in accordance with this subdivision and in accordance with Rule 3.2205 of the California Rules of Court.(2)No later than three business days following the date of the release of the draft environmental impact report, the lead agency shall make available to the public in a readily accessible electronic format the draft environmental impact report and all other documents relied on by the lead agency in the preparation of the draft environmental impact report. A document prepared by the lead agency after the date of the release of the draft environmental impact report that is a part of the record of proceedings shall be made available to the public in a readily accessible electronic format within five business days after the document is prepared by the lead agency.(3)Notwithstanding paragraph (2), documents relied on by the lead agency that were not prepared specifically for the project and are copyright protected are not required to be made readily accessible in an electronic format. For those copyright protected documents, the lead agency shall make an index of the documents available in an electronic format no later than the date of the release of the draft environmental impact report, or within five business days if the document is received or relied on by the lead agency after the release of the draft environmental impact report. The index shall specify the libraries or lead agency offices in which hardcopies of the copyrighted materials are available for public review.(4)The lead agency shall encourage written comments on the project to be submitted in a readily accessible electronic format, and shall make any such comments available to the public in a readily accessible electronic format within five calendar days of their receipt.(5)Within seven business days after the receipt of any comment that is not in an electronic format, the lead agency shall convert that comment into a readily accessible electronic format and make it available to the public in that format.(6)The lead agency shall indicate in the record of proceedings comments received that were not considered by the lead agency pursuant to paragraph (6) of subdivision (e) and need not include the content of the comments as a part of the record of proceedings.(7)Within five calendar days after the filing of the notice required by subdivision (a) of Section 21152, the lead agency shall certify the record of proceedings for the approval or determination and shall provide an electronic copy of the record of proceedings to a party that has submitted a written request for a copy. The lead agency may charge and collect a reasonable fee from a party requesting a copy of the record of proceedings for the electronic copy, which shall not exceed the reasonable cost of reproducing that copy.(8)Within 10 calendar days after being served with a complaint or a petition for a writ of mandate, the lead agency shall lodge a copy of the certified record of proceedings with the superior court.(9)Any dispute over the content of the record of proceedings shall be resolved by the superior court. Unless the superior court directs otherwise, a party disputing the content of the record of proceedings shall file a motion to augment the record of proceedings at the time it files its initial brief.(10)The contents of the record of proceedings shall be as set forth in subdivision (e) of Section 21167.6.(g)(1)Except as provided in paragraph (2), this section applies only to an environmental leadership transit project in either of the following circumstances:(A)The project is initially approved by the lead agency on or before January 1, 2027.(B)The draft environmental impact report for the project is initially circulated before January 1, 2025.(2)Paragraph (1) does not apply to actions or proceedings challenging an action taken by a public agency, including, but not limited to, a responsible agency and trustee agency, on the grounds of noncompliance with the law, after the initial approval by the lead agency.(h)This section shall only apply to the first seven projects obtaining a certified environmental impact report and meeting the requirements of this section.SEC. 4.SEC. 3.The provisions of this act are severable. If any provision of this act or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
SEC. 5.SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)(1)(A)This division does not apply to an active transportation plan, a pedestrian plan, or a bicycle transportation plan for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
(B)This division does not apply to a transit comprehensive operational analysis, transit route readjustment, or other transit agency route addition, elimination, or modification.
(2)An active transportation plan or pedestrian plan is encouraged to include the consideration of environmental factors, but that consideration does not inhibit or preclude the application of this section.
(3) An individual project that is a part of an active transportation plan, pedestrian plan, or transit comprehensive operational analysis remains subject to this division unless another exemption applies to that project.
(b)Before determining that a project described in subdivision (a) is exempt pursuant to this section, the lead agency shall hold noticed public hearings in areas affected by the project to hear and respond to public comments. Publication of the notice shall be no fewer times than required by Section 6061 of the Government Code by the public agency in a newspaper of general circulation in the area affected by the proposed project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(c)If a local agency determines that a project is not subject to this division pursuant to this section and it determines to approve or carry out that project, the notice shall be filed with the Office of Land Use and Climate Innovation and the county clerk in the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(d)For purposes of this section, the following definitions apply:
(1)Active transportation plan means a plan developed by a local jurisdiction that promotes and encourages people to choose walking, bicycling, or rolling through the creation of safe, comfortable, connected, and accessible walking, bicycling, or rolling networks, and encourages alternatives to single-occupancy vehicle trips.
(2)Pedestrian plan means a plan developed by a local jurisdiction that establishes a comprehensive, coordinated approach to improving pedestrian infrastructure and safety.
(3)Transit comprehensive operational analysis means a plan that redesigns or modifies a transit operators or local agencys public transit service network, including the routing of fixed route and microtransit services.
SEC. 2.Section 21080.25 of the Public Resources Code is amended to read:21080.25.(a)For purposes of this section, the following definitions apply:
(1)Affordable housing means any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents or sales prices to levels affordable, as defined in Section 50052.5 or 50053 of the Health and Safety Code, to persons and families of moderate, lower, or very low income, as defined in Section 50079.5, 50093, or 50105 of the Health and Safety Code, respectively.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that had been occupied by tenants within five years from the date of approval of the development agreement by a primary tenant who was low income and did not leave voluntarily.
(2)Bicycle facilities includes, but is not limited to, bicycle parking, bicycle sharing facilities, and bikeways as defined in Section 890.4 of the Streets and Highways Code.
(3)High-occupancy vehicle means a vehicle with three or more occupants.
(4)Highway means a way or place of whatever nature, publicly maintained and open to the use of the public for purposes of vehicular travel. Highway includes a street.
(5)Local agency means a public transit operator, city, county, city and county, special district, joint powers authority, local or regional transportation agency, or congestion management agency.
(6)Part-time transit lanes means designated highway shoulders that support the operation of transit vehicles during specified times and are not open to nonpublic transit vehicles at any time.
(7)Project labor agreement has the same meaning as defined in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(8)Public transit operator has the same meaning as operator in Section 99210 of the Public Utilities Code, or means a public entity that provides contracted paratransit services.
(9)Skilled and trained workforce has the same meaning as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(10)Transit lanes means street design elements that delineate space within the roadbed as exclusive to transit use, either full or part time.
(11)Transit prioritization projects means any of the following transit project types on highways or in the public right-of-way:
(A)Signal and sign changes, such as signal coordination, signal timing modifications, signal modifications, or the installation of traffic signs or new signals.
(B)The installation of wayside technology and onboard technology.
(C)The installation of ramp meters.
(D)The conversion to dedicated transit lanes, including transit queue jump or bypass lanes, shared turning lanes and turn restrictions, the narrowing of lanes to allow for dedicated transit lanes or transit reliability improvements, or the widening of existing transit travel lanes by removing or restricting street parking.
(E)Transit stop access and safety improvements, including, but not limited to, the installation of bus shelters, lighting, transit bulbs, and the installation of transit boarding landings and islands.
(12)Transportation demand management program means a specific program of strategies, incentives, and tools to be implemented, including, with specified annual status reporting obligations, to reduce vehicle trips by providing opportunities for the public to choose sustainable travel options, such as transit, bicycle riding, or walking. A specific program of strategies, incentives, and tools includes, but is not limited to, any of the following:
(A)Provision of onsite electric vehicle charging stations in excess of applicable requirements.
(B)Provision of dedicated parking for car share or zero-emission vehicles, or both types of vehicles, in excess of applicable requirements.
(C)Provision of bicycle parking in excess of applicable requirements.
(b)This division does not apply to any of the following projects:
(1)Pedestrian and bicycle facilities that improve safety, access, or mobility, including new facilities, within the public right-of-way.
(2)Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians within the public right-of-way.
(3)Transit prioritization projects.
(4)A project for the designation and conversion of general purpose lanes to high-occupancy vehicle lanes or bus-only lanes, or highway shoulders to part-time transit lanes, for use either during peak congestion hours or all day on highways with existing public transit service or where a public transit agency will be implementing public transit service as identified in a short-range transit plan.
(5)(A)A public project for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, or light rail service, including the protection, maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. The project shall be located on a site that entirely within an existing public right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for rail or public mass transit and is wholly within the boundaries of an urbanized area or urban cluster, as designated by the United States Census Bureau.
(B)A public project otherwise identified in subparagraph (A) shall not apply to the exemption pursuant to this paragraph after January 1, 2032, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, or hybrid powertrain vehicles. This subparagraph shall not apply to a public project otherwise identified in subparagraph (A) used by articulated buses.
(C)A public project for the construction or rehabilitation of a ferry terminal that a lead agency has submitted a notice of preparation for an environmental impact report pursuant to Section 21092 before January 1, 2026, shall not apply to the exemption pursuant to this paragraph.
(D)A public project for transit services operated by a transportation network company, as defined in Section 5431 of the Public Utilities Code, shall not apply to the exemption pursuant to this paragraph, unless the services are operated by a microtransit provider contracted by the lead agency that uses a managed fleet of multipassenger vehicles dedicated to that service.
(6)(A)A public project for the improvement, institution, or increase of passenger rail service, other than light rail service eligible under paragraph (5), including the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains or certified Tier 4 or cleaner rolling stock or locomotives, as provided in Section 1033.101 of Title 40 of the Code of Federal Regulations. The project shall be located entirely within an existing rail right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for passenger rail transit.
(B)A public project otherwise identified in subparagraph (A) shall not apply to be eligible for the exemption pursuant to this paragraph after January 1, 2040, if used primarily by certified Tier 4 or cleaner rolling stock or locomotives that are not zero-emission rolling stock or locomotives. locomotives and the project is located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone.
(7)(A)A public project to construct or maintain infrastructure or facilities to charge, refuel, power, or maintain zero-emission public transit buses, trains, or ferries, provided the project is carried out by a public transit agency and is consistent with the State Air Resources Boards 2020 Mobile Source Strategy, adopted on October 28, 2021. and the project is any of the following:
(i)Located on property owned, leased, or operated by the local agency.
(ii)Located within an existing public right-of-way.
(iii)Located on property owned by a public or private utility within an urbanized area.
(B)A lead agency applying an exemption pursuant to this paragraph for hydrogen refueling infrastructure or facilities necessary to refuel or maintain zero-emission public transit buses, trains, or ferries shall comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(8)The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with a project identified in paragraphs (1) to (7), inclusive.
(9)A project that consists exclusively of a combination of any of the components of a project identified in paragraphs (1) to (8), inclusive.
(10)A planning decision carried out by a local agency to reduce or eliminate minimum parking requirements or institute parking maximums, remove or restrict parking, or implement transportation demand management requirements or programs.
(c)Except as provided in subdivision (g), a project exempt from this division under this section shall meet all of the following criteria:
(1)(A)A local agency is carrying out the project and is the lead agency for the project.
(B)The lead agency shall take an action to approve a project as follows:
(i)The lead agencys governing board shall take an action at a public meeting.
(ii)Notwithstanding clause (i), if a lead agency has an alternative project approval process for a project subject to subdivision (b), it may instead follow that alternative process.
(2)The project does not induce single-occupancy vehicle trips, add additional highway lanes, widen highways, or add physical infrastructure or striping to highways except for minor modifications needed for the efficient and safe movement of transit vehicles, bicycles, or high-occupancy vehicles, such as extended merging lanes, shoulder improvements, or improvements to the roadway within the existing right-of-way. The project shall not include the addition of any auxiliary lanes.
(3)The construction of the project shall not require the demolition of affordable housing units.
(4)For a project subject to paragraphs (5) to (7), inclusive, of subdivision (b), the project shall be located within existing public right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for rail or public mass transit, or an existing rail right-of-way, whether or not the right-of-way is in use for passenger rail transit, on property owned, leased, or operated by the local agency, or on property owned by a public or private utility.(d)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed one hundred million dollars ($100,000,000) shall also meet all of the following criteria:
(A)The project is incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review pursuant to this division within 10 years of the approval of the project.
(B)The projects construction impacts are fully mitigated consistent with applicable law.
(C)(i)The lead agency shall complete and consider the results of a project business case and a racial equity analysis. The Office of Land Use and Climate Innovation may set guidelines for the project business case and the racial equity analysis or delegate that authority to metropolitan planning organizations.
(ii)The racial equity analysis required under this subparagraph shall identify the racial equity impacts of the project, identify who will benefit from and be burdened by the project, and, where significant or disproportionate impacts exist, suggest strategies, designs, or actions to mitigate those impacts.
(D)The lead agency shall hold noticed public meetings as follows:
(i)Before determining that a project is exempt pursuant to this section, the lead agency shall hold at least three noticed public meetings in the project area to hear and respond to public comments.
(ii)At least one of the three public meetings shall review the project business case and the racial equity analysis. The review of these documents does not inhibit or preclude application of this section.
(iii)The lead agency shall conduct at least two noticed public meetings annually during project construction for the public to provide comments.
(iv)The public meetings held pursuant to clauses (i) to (iii), inclusive, shall be in the form of either a public community planning meeting held in the project area or in the form of a regularly scheduled meeting of the governing body of the lead agency.
(E)The lead agency shall give public notice of the meetings in subparagraph (D) to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the lead agencys internet website and social media accounts.
(2)In addition to the requirements of paragraph (1), for a project described in that paragraph for which at least 50 percent of the project or projects stops and stations are located in an area that is at risk of residential displacement and that will have a maximum of 15-minute peak headways, the local agency shall complete an analysis of residential displacement and suggest antidisplacement strategies, designs, or actions. For a project subject to this paragraph, the lead agency shall define or identify areas at risk of residential displacement.
(3)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(e)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed fifty million dollars ($50,000,000) shall also comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(2)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(f)(1)(A)Except as provided in subdivision (g), as part of the lead agencys governing board action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), the lead agency shall certify that the project will be completed by a skilled and trained workforce.
(B)Subparagraph (A) does not apply if the lead agency has an existing policy or certification approved by its governing board that requires the use of a skilled and trained workforce to complete the project if the lead agency is a signatory to a project labor agreement that will require the use of a skilled and trained workforce on the project.
(2)(A)Except as provided in subparagraph (B), for a project that is exempted under this section, the lead agency shall not enter into a construction contract with any entity unless the entity provides to the lead agency an enforceable commitment that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or a contract that falls within an apprenticeship occupation in the building and construction trades in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)Subparagraph (A) does not apply if any of the following requirements are met:
(i)The lead agency has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project to use a skilled and trained workforce and the entity has agreed to be bound by that project labor agreement.
(ii)The project or contract is being performed under the extension or renewal of a project labor agreement that was entered into by the lead agency before January 1, 2021.
(iii)The entity contracted to perform the project entered into a project labor agreement that will bind the entity and all its subcontractors at every tier performing the project to use a skilled and trained workforce.
(g)Subdivisions (c) and (f) do not apply to a project described in paragraph (10) of subdivision (b).
(h)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to carry out that project, the lead agency shall file a notice of exemption with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(i)(1)The amendments made to paragraph (5) of subdivision (b) by Chapter 987 of the Statutes of 2022 (Senate Bill 922 of the 202122 Regular Session) may apply to projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023.
(2)For projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023, notwithstanding subdivision (d), as it read on December 31, 2022, the lead agency may certify that the project will be completed by a skilled and trained workforce after the granting of the exemption under this section or the lead agency may demonstrate compliance with subparagraph (B) of paragraph (1) of subdivision (f).
(j)(1)Beginning January 1, 2026, and every two years thereafter, the Office of Land Use and Climate Innovation shall adjust the amounts reflected in paragraph (1) of subdivision (c) and paragraph (1) of subdivision (e) to reflect changes in the Consumer Price Index, as indicated in the Consumer Price Index for All Urban Consumers, as calculated by the Department of Finance based on the United States Bureau of Labor Statistics data for the most recent odd-numbered year, and publish the updated amounts on its internet website.
(2)Notwithstanding the rulemaking provisions of the Administrative Procedure Act (Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code), the Office of Land Use and Climate Innovation may implement, interpret, or make specific this subdivision without taking any regulatory action.
(k)This section shall remain in effect only until January 1, 2040, and as of that date is repealed.
SEC. 3.Section 21168.6.9 of the Public Resources Code is amended to read:21168.6.9.(a)For purposes of this section, the following definitions apply:
(1)Environmental leadership transit project or project means a project to construct a fixed guideway and related fixed facilities that meets all of the following conditions:
(A)The fixed guideway operates at zero emissions.
(B)(i)If the project is more than two miles in length, the project reduces emissions by no less than 400,000 metric tons of greenhouse gases directly in the corridor of the project defined in the applicable environmental document over the useful life of the project, without using offsets.
(ii)If the project is no more than two miles in length, the project reduces emissions by no less than 50,000 metric tons of greenhouse gases directly in the corridor of the project defined in the applicable environmental document over the useful life of the project, without using offsets.
(C)The project reduces no less than 30,000,000 vehicle miles traveled in the corridor of the project defined in the applicable environmental document over the useful life of the project.
(D)The project is consistent with the applicable sustainable communities strategy or alternative planning strategy.
(E)The project is consistent with the applicable regional transportation plan.
(F)The project applicant demonstrates how it has incorporated sustainable infrastructure practices to achieve sustainability, resiliency, and climate change mitigation and adaptation goals in the project, including principles, frameworks, or guidelines as recommended by one or more of the following:
(i)The sustainability, resiliency, and climate change policies and standards of the American Society of Civil Engineers.
(ii)The Envision Rating System of the Institute for Sustainable Infrastructure.
(iii)The Leadership in Energy and Environment Design (LEED) rating system of the United States Green Building Council.
(G)The environmental leadership transit project is located wholly within the County of Los Angeles or connects to an existing transit project wholly located in the County of Los Angeles.
(H)For a project meeting the requirements of subparagraphs (A) to (G), inclusive, for which the environmental review pursuant to this division has commenced before January 1, 2022, the project applicant demonstrates that the record of proceedings is being, or has been, prepared in accordance with subdivision (f).
(2)Fixed guideway has the same meaning as defined in Section 5302 of Title 49 of the United States Code.
(3)Project applicant means a public or private entity or its affiliates that proposes an environmental leadership transit project, and its successors, heirs, and assignees.
(4)Project labor agreement has the same meaning as in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(5)Skilled and trained workforce has the same meaning as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(b)This section applies to an environmental leadership transit project if the project applicant does all of the following:
(1)The project applicant demonstrates compliance with the requirements of Chapter 12.8 (commencing with Section 42649) and Chapter 12.9 (commencing with Section 42649.8) of Part 3 of Division 30, as applicable.
(2)(A)Except as provided in subparagraph (B), the project applicant has entered into a binding and enforceable agreement that all mitigation measures required under this division shall be conditions of approval of the project, and those conditions will be fully enforceable by the lead agency or another agency designated by the lead agency. In the case of environmental mitigation measures, the project applicant agrees, as an ongoing obligation, that those measures will be monitored and enforced by the lead agency for the life of the obligation.
(B)For a project applicant that is a public agency and is also the lead agency, the public agency conditions the approval of the environmental leadership transit project on, and performs, all mitigation measures required under this division. In the case of environmental mitigation measures, the public agency, as an ongoing obligation, shall monitor those measures for the life of the obligation.
(3)The project applicant agrees to pay the costs of the trial court and the court of appeal in hearing and deciding any case challenging a lead agencys action on an environmental leadership transit project under this division, including payment of the costs for the appointment of a special master if deemed appropriate by the court, in a form and manner specified by the Judicial Council, as provided in the California Rules of Court adopted by the Judicial Council under subdivision (d).
(4)The project applicant agrees to bear the costs of preparing the record of proceedings for the project concurrent with review and consideration of the project under this division, in a form and manner specified by the lead agency for the project.
(c)(1)(A)If the project applicant is a public agency, the project applicant of an environmental leadership transit project shall obtain an enforceable commitment that any bidder, contractor, or other entity undertaking the project will use a skilled and trained workforce to complete the project.
(B)Subparagraph (A) does not apply if either of the following is met:
(i)The project applicant has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project to use a skilled and trained workforce.
(ii)The bidder, contractor, or other entity has entered into a project labor agreement that will bind all contractors and subcontractors at every tier performing work on the project to use a skilled and trained workforce.
(2)If the project applicant is a private entity, the project applicant of an environmental leadership transit project shall do both of the following:
(A)Certify to the lead agency that either of the following is true:
(i)The entirety of the project is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(ii)If the project is not in its entirety a public work and the project applicant is not required to pay prevailing wages to all construction workers under Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code, all construction workers employed on construction of the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the project is subject to this clause, then for those portions of the project that are not a public work all of the following shall apply:
(I)The project applicant shall ensure that the prevailing wage requirement is included in all contracts for the performance of all construction work.
(II)All contractors and subcontractors at every tier shall pay to all construction workers employed in the execution of the work at least the general prevailing rate of per diem wages, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.
(III)Except as provided in subclause (V), all contractors and subcontractors at every tier shall maintain and verify payroll records pursuant to Section 1776 of the Labor Code and make those records available for inspection and copying as provided by that section.
(IV)Except as provided in subclause (V), the obligation of the contractors and subcontractors at every tier to pay prevailing wages may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of the project, or by an underpaid worker through an administrative complaint or civil action, or by a joint labor-management committee through a civil action under Section 1771.2 of the Labor Code. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond or bonds issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.
(V)Subclauses (III) and (IV) do not apply if all contractors and subcontractors at every tier performing work on the project are subject to a project labor agreement that requires the payment of prevailing wages to all construction workers employed in the execution of the project and provides for enforcement of that obligation through an arbitration procedure.
(VI)Notwithstanding subdivision (c) of Section 1773.1 of the Labor Code, the requirement that employer payments not reduce the obligation to pay the hourly straight time or overtime wages found to be prevailing shall not apply if otherwise provided in a bona fide collective bargaining agreement covering the worker. The requirement to pay at least the general prevailing rate of per diem wages does not preclude use of an alternative workweek schedule adopted pursuant to Section 511 or 514 of the Labor Code.
(B)Certify to the lead agency that a skilled and trained workforce will be used to perform all construction work on the project. All of the following requirements shall apply to the project:
(i)The project applicant shall require in all contracts for the performance of work that every contractor and subcontractor at every tier will individually use a skilled and trained workforce to construct the project.
(ii)Every contractor and subcontractor at every tier shall use a skilled and trained workforce to construct the project.
(iii)(I)Except as provided in subclause (II), the project applicant shall provide to the lead agency, on a monthly basis while the project or contract is being performed, a report demonstrating compliance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code. A monthly report provided to the lead agency pursuant to this subclause shall be a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code) and shall be open to public inspection. A project applicant that fails to provide a monthly report demonstrating compliance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code shall be subject to a civil penalty of ten thousand dollars ($10,000) per month for each month for which the report has not been provided. Any contractor or subcontractor that fails to use a skilled and trained workforce shall be subject to a civil penalty of two hundred dollars ($200) per calendar day for each worker employed in contravention of the skilled and trained workforce requirement. Penalties may be assessed by the Labor Commissioner within 18 months of completion of the project using the same procedures for issuance of civil wage and penalty assessments pursuant to Section 1741 of the Labor Code, and may be reviewed pursuant to the same procedures in Section 1742 of the Labor Code. Penalties shall be paid to the State Public Works Enforcement Fund.
(II)Subclause (I) shall not apply if all contractors and subcontractors at every tier performing work on the project are subject to a project labor agreement that requires compliance with the skilled and trained workforce requirement and provides for enforcement of that obligation through an arbitration procedure.
(d)(1)On or before January 1, 2023, the Judicial Council shall adopt rules of court that apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of an environmental impact report for an environmental leadership transit project or the granting of any project approval that require the action or proceeding, including any potential appeals to the court of appeal or the Supreme Court, to be resolved, to the extent feasible, within 365 calendar days of the filing of the certified record of proceedings with the court.
(2)(A)An action or proceeding brought to attack, review, set aside, void, or annul an action or approval of a public agency, including, but not limited to, a responsible agency and a trustee agency, in furtherance of an environmental leadership transit project on the grounds of noncompliance with any law, including any potential appeals to the court of appeal or the Supreme Court, shall be resolved, to the extent feasible, within 365 calendar days of the filing of the certified record of proceedings for the challenged action or approval. On or before July 1, 2026, the Judicial Council shall adopt rules of court to implement this subparagraph.
(B)Before the adoption of the rule of court pursuant to subparagraph (A), the following apply to actions or proceedings subject to this paragraph:
(i)The respondent public agency shall lodge with the court the certified record of proceedings in electronic form within 10 days of the service of the action or proceeding.
(ii)(I)Except as provided in subclause (II), the petitioner shall file and serve its opening brief within 45 days of the lodging of the certified record of proceedings.
(II)If the petitioner filed and served the petition within 10 days of the commencement of the relevant limitation period for the action or proceeding, the opening brief shall be filed and served within 55 days of the lodging of the certified record of proceeding.
(iii)The hearing on the merits shall be held, to the extent feasible, within 100 days of the lodging of the certified record of proceedings. This time period may be extended by stipulation of the parties.
(iv)To the extent not inconsistent with clauses (i) to (iii), inclusive, Division 22 (commencing with Rule 3.2200) of Title 3 of, and Chapter 1 (commencing with Rule 8.700) of Division 3 of Title 8 of, the California Rules of Court shall apply to actions and proceedings subject to this paragraph.
(C)For an action or proceeding brought, in calendar year 2025, against an environmental leadership transit project approved in that calendar year, this paragraph shall apply to the maximum extent feasible.
(e)(1)(A)The draft and final environmental impact report for an environmental leadership transit project shall include a notice in not less than 12-point type stating the following:
THIS ENVIRONMENTAL IMPACT REPORT IS SUBJECT TO SECTION 21168.6.9 OF THE PUBLIC RESOURCES CODE, WHICH PROVIDES, AMONG OTHER THINGS, THAT THE LEAD AGENCY NEED NOT CONSIDER CERTAIN COMMENTS FILED AFTER THE CLOSE OF THE PUBLIC COMMENT PERIOD, IF ANY, FOR THE DRAFT ENVIRONMENTAL IMPACT REPORT. ANY JUDICIAL ACTION CHALLENGING THE CERTIFICATION OR ADOPTION OF THE ENVIRONMENTAL IMPACT REPORT OR THE APPROVAL OF THE PROJECT DESCRIBED IN SECTION 21168.6.9 OF THE PUBLIC RESOURCES CODE IS
SUBJECT TO THE PROCEDURES SET FORTH IN THAT SECTION. A COPY OF SECTION 21168.6.9 OF THE PUBLIC RESOURCES CODE IS INCLUDED IN THE APPENDIX TO THIS ENVIRONMENTAL IMPACT REPORT.
(B)For an environmental leadership transit project for which a draft environmental impact report was issued before January 1, 2022, the lead agency shall, before February 1, 2022, or before the public hearing on the certification of the environmental impact report, whichever is earlier, provide the notice specified in subparagraph (A), in writing, to all parties that have requested notification regarding the project. The lead agency shall include that notice and the appendix required pursuant to paragraph (2) in the final environmental impact report for the project.
(C)For an environmental leadership transit project for which a final environmental impact report was issued before January 1, 2022, the lead agency shall, before February 1, 2022, or before the issuance of the notice of determination, whichever is earlier, do both of the following:
(i)Issue an addendum to the final environmental impact report containing the notice specified in subparagraph (A) and the appendix required pursuant to paragraph (2).
(ii)Provide notice, in writing, of the addendum to all parties that have requested notification regarding the project.
(2)The draft environmental impact report and final environmental impact report shall contain, as an appendix, the full text of this section.
(3)Within 10 calendar days after the release of the draft environmental impact report, the lead agency shall conduct an informational workshop to inform the public of the key analyses and conclusions of that document, as applicable.
(4)Within 10 calendar days before the close of the public comment period, the lead agency shall hold a public hearing to receive testimony on the draft environmental impact report. A transcript of the hearing shall be included as an appendix to the final environmental impact report, as applicable.
(5)(A)Within five calendar days following the close of the public comment period, a commenter on the draft environmental impact report may submit to the lead agency a written request for nonbinding mediation, as applicable. The lead agency shall participate in nonbinding mediation with all commenters who submitted timely comments on the draft environmental impact report and who requested the mediation. Mediation conducted pursuant to this paragraph shall end no later than 35 calendar days after the close of the public comment period.
(B)A request for mediation shall identify all areas of dispute raised in the comment submitted by the commenter that are to be mediated.
(C)The lead agency shall select one or more mediators who shall be retired judges or recognized experts with at least five years experience in land use and environmental law or science, or mediation. The lead agency shall bear the costs of mediation.
(D)A mediation session shall be conducted on each area of dispute with the parties requesting mediation on that area of dispute.
(E)The lead agency shall adopt, as a condition of approval, any measures agreed upon by the lead agency and any commenter who requested mediation. A commenter who agrees to a measure pursuant to this subparagraph shall not raise the issue addressed by that measure as a basis for an action or proceeding challenging the lead agencys decision to certify the environmental impact report or to grant project approval.
(6)The lead agency need not consider written comments on the draft environmental impact report submitted after the close of the public comment period, unless those comments address any of the following:
(A)New issues raised in the response to comments by the lead agency.
(B)New information released by the lead agency subsequent to the release of the draft environmental impact report, such as new information set forth or embodied in a staff report, proposed permit, proposed resolution, ordinance, or similar documents.
(C)Changes made to the project after the close of the public comment period.
(D)Proposed conditions for approval, mitigation measures, or proposed findings required by Section 21081 or a proposed reporting or monitoring program required by paragraph (1) of subdivision (a) of Section 21081.6, if the lead agency releases those documents subsequent to the release of the draft environmental impact report.
(E)New information that was not reasonably known and could not have been reasonably known during the public comment period.
(7)The lead agency shall file the notice required by subdivision (a) of Section 21152 within five calendar days after the last initial project approval.
(f)(1)The lead agency shall prepare and certify the record of proceedings in accordance with this subdivision and in accordance with Rule 3.2205 of the California Rules of Court.
(2)No later than three business days following the date of the release of the draft environmental impact report, the lead agency shall make available to the public in a readily accessible electronic format the draft environmental impact report and all other documents relied on by the lead agency in the preparation of the draft environmental impact report. A document prepared by the lead agency after the date of the release of the draft environmental impact report that is a part of the record of proceedings shall be made available to the public in a readily accessible electronic format within five business days after the document is prepared by the lead agency.
(3)Notwithstanding paragraph (2), documents relied on by the lead agency that were not prepared specifically for the project and are copyright protected are not required to be made readily accessible in an electronic format. For those copyright protected documents, the lead agency shall make an index of the documents available in an electronic format no later than the date of the release of the draft environmental impact report, or within five business days if the document is received or relied on by the lead agency after the release of the draft environmental impact report. The index shall specify the libraries or lead agency offices in which hardcopies of the copyrighted materials are available for public review.
(4)The lead agency shall encourage written comments on the project to be submitted in a readily accessible electronic format, and shall make any such comments available to the public in a readily accessible electronic format within five calendar days of their receipt.
(5)Within seven business days after the receipt of any comment that is not in an electronic format, the lead agency shall convert that comment into a readily accessible electronic format and make it available to the public in that format.
(6)The lead agency shall indicate in the record of proceedings comments received that were not considered by the lead agency pursuant to paragraph (6) of subdivision (e) and need not include the content of the comments as a part of the record of proceedings.
(7)Within five calendar days after the filing of the notice required by subdivision (a) of Section 21152, the lead agency shall certify the record of proceedings for the approval or determination and shall provide an electronic copy of the record of proceedings to a party that has submitted a written request for a copy. The lead agency may charge and collect a reasonable fee from a party requesting a copy of the record of proceedings for the electronic copy, which shall not exceed the reasonable cost of reproducing that copy.
(8)Within 10 calendar days after being served with a complaint or a petition for a writ of mandate, the lead agency shall lodge a copy of the certified record of proceedings with the superior court.
(9)Any dispute over the content of the record of proceedings shall be resolved by the superior court. Unless the superior court directs otherwise, a party disputing the content of the record of proceedings shall file a motion to augment the record of proceedings at the time it files its initial brief.
(10)The contents of the record of proceedings shall be as set forth in subdivision (e) of Section 21167.6.
(g)(1)Except as provided in paragraph (2), this section applies only to an environmental leadership transit project in either of the following circumstances:
(A)The project is initially approved by the lead agency on or before January 1, 2027.
(B)The draft environmental impact report for the project is initially circulated before January 1, 2025.
(2)Paragraph (1) does not apply to actions or proceedings challenging an action taken by a public agency, including, but not limited to, a responsible agency and trustee agency, on the grounds of noncompliance with the law, after the initial approval by the lead agency.
(h)This section shall only apply to the first seven projects obtaining a certified environmental impact report and meeting the requirements of this section.
SEC. 4.The provisions of this act are severable. If any provision of this act or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)(1)(A)This division does not apply to an active transportation plan, a pedestrian plan, or a bicycle transportation plan for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
(B)This division does not apply to a transit comprehensive operational analysis, transit route readjustment, or other transit agency route addition, elimination, or modification.
(2)An active transportation plan or pedestrian plan is encouraged to include the consideration of environmental factors, but that consideration does not inhibit or preclude the application of this section.
(3) An individual project that is a part of an active transportation plan, pedestrian plan, or transit comprehensive operational analysis remains subject to this division unless another exemption applies to that project.
(b)Before determining that a project described in subdivision (a) is exempt pursuant to this section, the lead agency shall hold noticed public hearings in areas affected by the project to hear and respond to public comments. Publication of the notice shall be no fewer times than required by Section 6061 of the Government Code by the public agency in a newspaper of general circulation in the area affected by the proposed project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(c)If a local agency determines that a project is not subject to this division pursuant to this section and it determines to approve or carry out that project, the notice shall be filed with the Office of Land Use and Climate Innovation and the county clerk in the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(d)For purposes of this section, the following definitions apply:
(1)Active transportation plan means a plan developed by a local jurisdiction that promotes and encourages people to choose walking, bicycling, or rolling through the creation of safe, comfortable, connected, and accessible walking, bicycling, or rolling networks, and encourages alternatives to single-occupancy vehicle trips.
(2)Pedestrian plan means a plan developed by a local jurisdiction that establishes a comprehensive, coordinated approach to improving pedestrian infrastructure and safety.
(3)Transit comprehensive operational analysis means a plan that redesigns or modifies a transit operators or local agencys public transit service network, including the routing of fixed route and microtransit services.
SEC. 2.Section 21080.25 of the Public Resources Code is amended to read:SEC. 2.Section 21080.25 of the Public Resources Code is amended to read:21080.25.(a)For purposes of this section, the following definitions apply:
(1)Affordable housing means any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents or sales prices to levels affordable, as defined in Section 50052.5 or 50053 of the Health and Safety Code, to persons and families of moderate, lower, or very low income, as defined in Section 50079.5, 50093, or 50105 of the Health and Safety Code, respectively.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that had been occupied by tenants within five years from the date of approval of the development agreement by a primary tenant who was low income and did not leave voluntarily.
(2)Bicycle facilities includes, but is not limited to, bicycle parking, bicycle sharing facilities, and bikeways as defined in Section 890.4 of the Streets and Highways Code.
(3)High-occupancy vehicle means a vehicle with three or more occupants.
(4)Highway means a way or place of whatever nature, publicly maintained and open to the use of the public for purposes of vehicular travel. Highway includes a street.
(5)Local agency means a public transit operator, city, county, city and county, special district, joint powers authority, local or regional transportation agency, or congestion management agency.
(6)Part-time transit lanes means designated highway shoulders that support the operation of transit vehicles during specified times and are not open to nonpublic transit vehicles at any time.
(7)Project labor agreement has the same meaning as defined in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(8)Public transit operator has the same meaning as operator in Section 99210 of the Public Utilities Code, or means a public entity that provides contracted paratransit services.
(9)Skilled and trained workforce has the same meaning as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(10)Transit lanes means street design elements that delineate space within the roadbed as exclusive to transit use, either full or part time.
(11)Transit prioritization projects means any of the following transit project types on highways or in the public right-of-way:
(A)Signal and sign changes, such as signal coordination, signal timing modifications, signal modifications, or the installation of traffic signs or new signals.
(B)The installation of wayside technology and onboard technology.
(C)The installation of ramp meters.
(D)The conversion to dedicated transit lanes, including transit queue jump or bypass lanes, shared turning lanes and turn restrictions, the narrowing of lanes to allow for dedicated transit lanes or transit reliability improvements, or the widening of existing transit travel lanes by removing or restricting street parking.
(E)Transit stop access and safety improvements, including, but not limited to, the installation of bus shelters, lighting, transit bulbs, and the installation of transit boarding landings and islands.
(12)Transportation demand management program means a specific program of strategies, incentives, and tools to be implemented, including, with specified annual status reporting obligations, to reduce vehicle trips by providing opportunities for the public to choose sustainable travel options, such as transit, bicycle riding, or walking. A specific program of strategies, incentives, and tools includes, but is not limited to, any of the following:
(A)Provision of onsite electric vehicle charging stations in excess of applicable requirements.
(B)Provision of dedicated parking for car share or zero-emission vehicles, or both types of vehicles, in excess of applicable requirements.
(C)Provision of bicycle parking in excess of applicable requirements.
(b)This division does not apply to any of the following projects:
(1)Pedestrian and bicycle facilities that improve safety, access, or mobility, including new facilities, within the public right-of-way.
(2)Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians within the public right-of-way.
(3)Transit prioritization projects.
(4)A project for the designation and conversion of general purpose lanes to high-occupancy vehicle lanes or bus-only lanes, or highway shoulders to part-time transit lanes, for use either during peak congestion hours or all day on highways with existing public transit service or where a public transit agency will be implementing public transit service as identified in a short-range transit plan.
(5)(A)A public project for the protection, improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, or light rail service, including the protection, maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. The project shall be located on a site that is wholly within the boundaries of an urbanized area or urban cluster, as designated by the United States Census Bureau.
(B)A public project otherwise identified in subparagraph (A) shall not apply to the exemption pursuant to this paragraph after January 1, 2032, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, or hybrid powertrain vehicles. This subparagraph shall not apply to a public project otherwise identified in subparagraph (A) used by articulated buses.
(C)A public project for the construction or rehabilitation of a ferry terminal that a lead agency has submitted a notice of preparation for an environmental impact report pursuant to Section 21092 before January 1, 2026, shall not apply to the exemption pursuant to this paragraph.
(D)A public project for transit services operated by a transportation network company, as defined in Section 5431 of the Public Utilities Code, shall not apply to the exemption pursuant to this paragraph, unless the services are operated by a microtransit provider contracted by the lead agency that uses a managed fleet of multipassenger vehicles dedicated to that service.
(6)(A)A public project for the improvement, institution, or increase of passenger rail service, other than light rail service eligible under paragraph (5), including the maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains or certified Tier 4 or cleaner rolling stock or locomotives, as provided in Section 1033.101 of Title 40 of the Code of Federal Regulations.
(B)A public project otherwise identified in subparagraph (A) shall not apply to the exemption pursuant to this paragraph after January 1, 2040, if used primarily by certified Tier 4 or cleaner rolling stock or locomotives that are not zero-emission rolling stock or locomotives.
(7)(A)A public project to construct or maintain infrastructure or facilities to charge, refuel, power, or maintain zero-emission public transit buses, trains, or ferries, provided the project is carried out by a public transit agency in compliance with, the State Air Resources Boards Innovative Clean Transit regulations (Article 4.3 (commencing with Section 2023) of Chapter 1 of Division 3 of Title 13 of the California Code of Regulations), the Commercial Harbor Craft regulations (Article 4.3 (commencing with Section 2299.5) of Chapter 5.1 of Division 3 of Title 13 of the California Code of Regulations and Article 4.3 (commencing with Section 93118.5) of Chapter 1 of Division 3 of Title 17 of the California Code of Regulations), the In-Use Locomotive regulations (Article 8 (commencing with Section 2478) of Chapter 9 of Division 3 of Title 13 of the California Code of Regulations), or any regulations identified by and is consistent with the State Air Resources Boards 2020 Mobile Source Strategy, adopted on October 28, 2021.
(B)A lead agency applying an exemption pursuant to this paragraph for hydrogen refueling infrastructure or facilities necessary to refuel or maintain zero-emission public transit buses, trains, or ferries shall comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(8)The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with a project identified in paragraphs (1) to (7), inclusive.
(9)A project that consists exclusively of a combination of any of the components of a project identified in paragraphs (1) to (8), inclusive.
(10)A planning decision carried out by a local agency to reduce or eliminate minimum parking requirements or institute parking maximums, remove or restrict parking, or implement transportation demand management requirements or programs.
(c)Except as provided in subdivision (g), a project exempt from this division under this section shall meet all of the following criteria:
(1)(A)A local agency is carrying out the project and is the lead agency for the project.
(B)The lead agency shall take an action to approve a project as follows:
(i)The lead agencys governing board shall take an action at a public meeting.
(ii)Notwithstanding clause (i), if a lead agency has an alternative project approval process for a project subject to subdivision (b), it may instead follow that alternative process.
(2)The project does not induce single-occupancy vehicle trips, add additional highway lanes, widen highways, or add physical infrastructure or striping to highways except for minor modifications needed for the efficient and safe movement of transit vehicles, bicycles, or high-occupancy vehicles, such as extended merging lanes, shoulder improvements, or improvements to the roadway within the existing right-of-way. The project shall not include the addition of any auxiliary lanes.
(3)The construction of the project shall not require the demolition of affordable housing units.
(4)For a project subject to paragraphs (5) to (7), inclusive, of subdivision (b), the project shall be located within existing public right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for rail or public mass transit, or an existing rail right-of-way, whether or not the right-of-way is in use for passenger rail transit, on property owned, leased, or operated by the local agency, or on property owned by a public or private utility.
(d)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed one hundred million dollars ($100,000,000) shall also meet all of the following criteria:
(A)The project is incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review pursuant to this division within 10 years of the approval of the project.
(B)The projects construction impacts are fully mitigated consistent with applicable law.
(C)(i)The lead agency shall complete and consider the results of a project business case and a racial equity analysis. The Office of Land Use and Climate Innovation may set guidelines for the project business case and the racial equity analysis or delegate that authority to metropolitan planning organizations.
(ii)The racial equity analysis required under this subparagraph shall identify the racial equity impacts of the project, identify who will benefit from and be burdened by the project, and, where significant or disproportionate impacts exist, suggest strategies, designs, or actions to mitigate those impacts.
(D)The lead agency shall hold noticed public meetings as follows:
(i)Before determining that a project is exempt pursuant to this section, the lead agency shall hold at least three noticed public meetings in the project area to hear and respond to public comments.
(ii)At least one of the three public meetings shall review the project business case and the racial equity analysis. The review of these documents does not inhibit or preclude application of this section.
(iii)The lead agency shall conduct at least two noticed public meetings annually during project construction for the public to provide comments.
(iv)The public meetings held pursuant to clauses (i) to (iii), inclusive, shall be in the form of either a public community planning meeting held in the project area or in the form of a regularly scheduled meeting of the governing body of the lead agency.
(E)The lead agency shall give public notice of the meetings in subparagraph (D) to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the lead agencys internet website and social media accounts.
(2)In addition to the requirements of paragraph (1), for a project described in that paragraph for which at least 50 percent of the project or projects stops and stations are located in an area that is at risk of residential displacement and that will have a maximum of 15-minute peak headways, the local agency shall complete an analysis of residential displacement and suggest antidisplacement strategies, designs, or actions. For a project subject to this paragraph, the lead agency shall define or identify areas at risk of residential displacement.
(3)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(e)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed fifty million dollars ($50,000,000) shall also comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(2)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(f)(1)(A)Except as provided in subdivision (g), as part of the lead agencys governing board action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), the lead agency shall certify that the project will be completed by a skilled and trained workforce.
(B)Subparagraph (A) does not apply if the lead agency has an existing policy or certification approved by its governing board that requires the use of a skilled and trained workforce to complete the project if the lead agency is a signatory to a project labor agreement that will require the use of a skilled and trained workforce on the project.
(2)(A)Except as provided in subparagraph (B), for a project that is exempted under this section, the lead agency shall not enter into a construction contract with any entity unless the entity provides to the lead agency an enforceable commitment that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or a contract that falls within an apprenticeship occupation in the building and construction trades in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)Subparagraph (A) does not apply if any of the following requirements are met:
(i)The lead agency has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project to use a skilled and trained workforce and the entity has agreed to be bound by that project labor agreement.
(ii)The project or contract is being performed under the extension or renewal of a project labor agreement that was entered into by the lead agency before January 1, 2021.
(iii)The entity contracted to perform the project entered into a project labor agreement that will bind the entity and all its subcontractors at every tier performing the project to use a skilled and trained workforce.
(g)Subdivisions (c) and (f) do not apply to a project described in paragraph (10) of subdivision (b).
(h)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to carry out that project, the lead agency shall file a notice of exemption with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(i)(1)The amendments made to paragraph (5) of subdivision (b) by Chapter 987 of the Statutes of 2022 (Senate Bill 922 of the 202122 Regular Session) may apply to projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023.
(2)For projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023, notwithstanding subdivision (d), as it read on December 31, 2022, the lead agency may certify that the project will be completed by a skilled and trained workforce after the granting of the exemption under this section or the lead agency may demonstrate compliance with subparagraph (B) of paragraph (1) of subdivision (f).
(j)(1)Beginning January 1, 2026, and every two years thereafter, the Office of Land Use and Climate Innovation shall adjust the amounts reflected in paragraph (1) of subdivision (c) and paragraph (1) of subdivision (e) to reflect changes in the Consumer Price Index, as indicated in the Consumer Price Index for All Urban Consumers, as calculated by the Department of Finance based on the United States Bureau of Labor Statistics data for the most recent odd-numbered year, and publish the updated amounts on its internet website.
(2)Notwithstanding the rulemaking provisions of the Administrative Procedure Act (Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code), the Office of Land Use and Climate Innovation may implement, interpret, or make specific this subdivision without taking any regulatory action.
SEC. 3.Section 21168.6.9 of the Public Resources Code is amended to read:21168.6.9.(a)For purposes of this section, the following definitions apply:
(1)Environmental leadership transit project or project means a project to construct a fixed guideway and related fixed facilities that meets all of the following conditions:
(A)The fixed guideway operates at zero emissions.
(B)(i)If the project is more than two miles in length, the project reduces emissions by no less than 400,000 metric tons of greenhouse gases directly in the corridor of the project defined in the applicable environmental document over the useful life of the project, without using offsets.
(ii)If the project is no more than two miles in length, the project reduces emissions by no less than 50,000 metric tons of greenhouse gases directly in the corridor of the project defined in the applicable environmental document over the useful life of the project, without using offsets.
(C)The project reduces no less than 30,000,000 vehicle miles traveled in the corridor of the project defined in the applicable environmental document over the useful life of the project.
(D)The project is consistent with the applicable sustainable communities strategy or alternative planning strategy.
(E)The project is consistent with the applicable regional transportation plan.
(F)The project applicant demonstrates how it has incorporated sustainable infrastructure practices to achieve sustainability, resiliency, and climate change mitigation and adaptation goals in the project, including principles, frameworks, or guidelines as recommended by one or more of the following:
(i)The sustainability, resiliency, and climate change policies and standards of the American Society of Civil Engineers.
(ii)The Envision Rating System of the Institute for Sustainable Infrastructure.
(iii)The Leadership in Energy and Environment Design (LEED) rating system of the United States Green Building Council.
(G)The environmental leadership transit project is located wholly within the County of Los Angeles or connects to an existing transit project wholly located in the County of Los Angeles.
(H)For a project meeting the requirements of subparagraphs (A) to (G), inclusive, for which the environmental review pursuant to this division has commenced before January 1, 2022, the project applicant demonstrates that the record of proceedings is being, or has been, prepared in accordance with subdivision (f).
(2)Fixed guideway has the same meaning as defined in Section 5302 of Title 49 of the United States Code.
(3)Project applicant means a public or private entity or its affiliates that proposes an environmental leadership transit project, and its successors, heirs, and assignees.
(4)Project labor agreement has the same meaning as in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(5)Skilled and trained workforce has the same meaning as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(b)This section applies to an environmental leadership transit project if the project applicant does all of the following:
(1)The project applicant demonstrates compliance with the requirements of Chapter 12.8 (commencing with Section 42649) and Chapter 12.9 (commencing with Section 42649.8) of Part 3 of Division 30, as applicable.
(2)(A)Except as provided in subparagraph (B), the project applicant has entered into a binding and enforceable agreement that all mitigation measures required under this division shall be conditions of approval of the project, and those conditions will be fully enforceable by the lead agency or another agency designated by the lead agency. In the case of environmental mitigation measures, the project applicant agrees, as an ongoing obligation, that those measures will be monitored and enforced by the lead agency for the life of the obligation.
(B)For a project applicant that is a public agency and is also the lead agency, the public agency conditions the approval of the environmental leadership transit project on, and performs, all mitigation measures required under this division. In the case of environmental mitigation measures, the public agency, as an ongoing obligation, shall monitor those measures for the life of the obligation.
(3)The project applicant agrees to pay the costs of the trial court and the court of appeal in hearing and deciding any case challenging a lead agencys action on an environmental leadership transit project under this division, including payment of the costs for the appointment of a special master if deemed appropriate by the court, in a form and manner specified by the Judicial Council, as provided in the California Rules of Court adopted by the Judicial Council under subdivision (d).
(4)The project applicant agrees to bear the costs of preparing the record of proceedings for the project concurrent with review and consideration of the project under this division, in a form and manner specified by the lead agency for the project.
(c)(1)(A)If the project applicant is a public agency, the project applicant of an environmental leadership transit project shall obtain an enforceable commitment that any bidder, contractor, or other entity undertaking the project will use a skilled and trained workforce to complete the project.
(B)Subparagraph (A) does not apply if either of the following are is met:
(i)The project applicant has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project to use a skilled and trained workforce.
(ii)The bidder, contractor, or other entity has entered into a project labor agreement that will bind all contractors and subcontractors at every tier performing work on the project to use a skilled and trained workforce.
(2)If the project applicant is a private entity, the project applicant of an environmental leadership transit project shall do both of the following:
(A)Certify to the lead agency that either of the following is true:
(i)The entirety of the project is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(ii)If the project is not in its entirety a public work and the project applicant is not required to pay prevailing wages to all construction workers under Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code, all construction workers employed on construction of the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the project is subject to this clause, then for those portions of the project that are not a public work all of the following shall apply:
(I)The project applicant shall ensure that the prevailing wage requirement is included in all contracts for the performance of all construction work.
(II)All contractors and subcontractors at every tier shall pay to all construction workers employed in the execution of the work at least the general prevailing rate of per diem wages, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.
(III)Except as provided in subclause (V), all contractors and subcontractors at every tier shall maintain and verify payroll records pursuant to Section 1776 of the Labor Code and make those records available for inspection and copying as provided by that section.
(IV)Except as provided in subclause (V), the obligation of the contractors and subcontractors at every tier to pay prevailing wages may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of the project, or by an underpaid worker through an administrative complaint or civil action, or by a joint labor-management committee through a civil action under Section 1771.2 of the Labor Code. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond or bonds issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.
(V)Subclauses (III) and (IV) do not apply if all contractors and subcontractors at every tier performing work on the project are subject to a project labor agreement that requires the payment of prevailing wages to all construction workers employed in the execution of the project and provides for enforcement of that obligation through an arbitration procedure.
(VI)Notwithstanding subdivision (c) of Section 1773.1 of the Labor Code, the requirement that employer payments not reduce the obligation to pay the hourly straight time or overtime wages found to be prevailing shall not apply if otherwise provided in a bona fide collective bargaining agreement covering the worker. The requirement to pay at least the general prevailing rate of per diem wages does not preclude use of an alternative workweek schedule adopted pursuant to Section 511 or 514 of the Labor Code.
(B)Certify to the lead agency that a skilled and trained workforce will be used to perform all construction work on the project. All of the following requirements shall apply to the project:
(i)The project applicant shall require in all contracts for the performance of work that every contractor and subcontractor at every tier will individually use a skilled and trained workforce to construct the project.
(ii)Every contractor and subcontractor at every tier shall use a skilled and trained workforce to construct the project.
(iii)(I)Except as provided in subclause (II), the project applicant shall provide to the lead agency, on a monthly basis while the project or contract is being performed, a report demonstrating compliance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code. A monthly report provided to the lead agency pursuant to this subclause shall be a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code) and shall be open to public inspection. A project applicant that fails to provide a monthly report demonstrating compliance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code shall be subject to a civil penalty of ten thousand dollars ($10,000) per month for each month for which the report has not been provided. Any contractor or subcontractor that fails to use a skilled and trained workforce shall be subject to a civil penalty of two hundred dollars ($200) per calendar day for each worker employed in contravention of the skilled and trained workforce requirement. Penalties may be assessed by the Labor Commissioner within 18 months of completion of the project using the same procedures for issuance of civil wage and penalty assessments pursuant to Section 1741 of the Labor Code, and may be reviewed pursuant to the same procedures in Section 1742 of the Labor Code. Penalties shall be paid to the State Public Works Enforcement Fund.
(II)Subclause (I) shall not apply if all contractors and subcontractors at every tier performing work on the project are subject to a project labor agreement that requires compliance with the skilled and trained workforce requirement and provides for enforcement of that obligation through an arbitration procedure.
(d)(1)On or before January 1, 2023, the Judicial Council shall adopt rules of court that apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of an environmental impact report for an environmental leadership transit project or the granting of any project approval that require the action or proceeding, including any potential appeals to the court of appeal or the Supreme Court, to be resolved, to the extent feasible, within 365 calendar days of the filing of the certified record of proceedings with the court.
(2)(A)An action or proceeding brought to attack, review, set aside, void, or annul an action or approval of a public agency, including, but not limited to, a responsible agency and a trustee agency, in furtherance of an environmental leadership transit project on the grounds of noncompliance with any law, including any potential appeals to the court of appeal or the Supreme Court, shall be resolved, to the extent feasible, within 365 calendar days of the filing of the certified record of proceedings for the challenged action or approval. On or before July 1, 2026, the Judicial Council shall adopt rules of court to implement this subparagraph.
(B)Before the adoption of the rule of court pursuant to subparagraph (A), the following apply to actions or proceedings subject to this paragraph:
(i)The respondent public agency shall lodge with the court the certified record of proceedings in electronic form within 10 days of the service of the action or proceeding.
(ii)(I)Except as provided in subclause (II), the petitioner shall file and serve its opening brief within 45 days of the lodging of the certified record of proceedings.
(II)If the petitioner filed and served the petition within 10 days of the commencement of the relevant limitation period for the action or proceeding, the opening brief shall be filed and served within 55 days of the lodging of the certified record of proceeding.
(iii)The hearing on the merits shall be held, to the extent feasible, within 100 days of the lodging of the certified record of proceedings. This time period may be extended by stipulation of the parties.
(iv)To the extent not inconsistent with clauses (i) to (iii), inclusive, Division 22 (commencing with Rule 3.2200) of Title 3 of, and Chapter 1 (commencing with Rule 8.700) of Division 3 of Title 8 of, the California Rules of Court shall apply to actions and proceedings subject to this paragraph.
(C)For an action or proceeding brought, in calendar year 2025, against an environmental leadership transit project approved in that calendar year, this paragraph shall apply to the maximum extent feasible.
(e)(1)(A)The draft and final environmental impact report for an environmental leadership transit project shall include a notice in not less than 12-point type stating the following:
THIS ENVIRONMENTAL IMPACT REPORT IS SUBJECT TO SECTION 21168.6.9 OF THE PUBLIC RESOURCES CODE, WHICH PROVIDES, AMONG OTHER THINGS, THAT THE LEAD AGENCY NEED NOT CONSIDER CERTAIN COMMENTS FILED AFTER THE CLOSE OF THE PUBLIC COMMENT PERIOD, IF ANY, FOR THE DRAFT ENVIRONMENTAL IMPACT REPORT. ANY JUDICIAL ACTION CHALLENGING THE CERTIFICATION OR ADOPTION OF THE ENVIRONMENTAL IMPACT REPORT OR THE APPROVAL OF THE PROJECT DESCRIBED IN SECTION 21168.6.9 OF THE PUBLIC RESOURCES CODE IS
SUBJECT TO THE PROCEDURES SET FORTH IN THAT SECTION. A COPY OF SECTION 21168.6.9 OF THE PUBLIC RESOURCES CODE IS INCLUDED IN THE APPENDIX TO THIS ENVIRONMENTAL IMPACT REPORT.
(B)For an environmental leadership transit project for which a draft environmental impact report was issued before January 1, 2022, the lead agency shall, before February 1, 2022, or before the public hearing on the certification of the environmental impact report, whichever is earlier, provide the notice specified in subparagraph (A), in writing, to all parties that have requested notification regarding the project. The lead agency shall include that notice and the appendix required pursuant to paragraph (2) in the final environmental impact report for the project.
(C)For an environmental leadership transit project for which a final environmental impact report was issued before January 1, 2022, the lead agency shall, before February 1, 2022, or before the issuance of the notice of determination, whichever is earlier, do both of the following:
(i)Issue an addendum to the final environmental impact report containing the notice specified in subparagraph (A) and the appendix required pursuant to paragraph (2).
(ii)Provide notice, in writing, of the addendum to all parties that have requested notification regarding the project.
(2)The draft environmental impact report and final environmental impact report shall contain, as an appendix, the full text of this section.
(3)Within 10 calendar days after the release of the draft environmental impact report, the lead agency shall conduct an informational workshop to inform the public of the key analyses and conclusions of that document, as applicable.
(4)Within 10 calendar days before the close of the public comment period, the lead agency shall hold a public hearing to receive testimony on the draft environmental impact report. A transcript of the hearing shall be included as an appendix to the final environmental impact report, as applicable.
(5)(A)Within five calendar days following the close of the public comment period, a commenter on the draft environmental impact report may submit to the lead agency a written request for nonbinding mediation, as applicable. The lead agency shall participate in nonbinding mediation with all commenters who submitted timely comments on the draft environmental impact report and who requested the mediation. Mediation conducted pursuant to this paragraph shall end no later than 35 calendar days after the close of the public comment period.
(B)A request for mediation shall identify all areas of dispute raised in the comment submitted by the commenter that are to be mediated.
(C)The lead agency shall select one or more mediators who shall be retired judges or recognized experts with at least five years experience in land use and environmental law or science, or mediation. The lead agency shall bear the costs of mediation.
(D)A mediation session shall be conducted on each area of dispute with the parties requesting mediation on that area of dispute.
(E)The lead agency shall adopt, as a condition of approval, any measures agreed upon by the lead agency and any commenter who requested mediation. A commenter who agrees to a measure pursuant to this subparagraph shall not raise the issue addressed by that measure as a basis for an action or proceeding challenging the lead agencys decision to certify the environmental impact report or to grant project approval.
(6)The lead agency need not consider written comments on the draft environmental impact report submitted after the close of the public comment period, unless those comments address any of the following:
(A)New issues raised in the response to comments by the lead agency.
(B)New information released by the lead agency subsequent to the release of the draft environmental impact report, such as new information set forth or embodied in a staff report, proposed permit, proposed resolution, ordinance, or similar documents.
(C)Changes made to the project after the close of the public comment period.
(D)Proposed conditions for approval, mitigation measures, or proposed findings required by Section 21081 or a proposed reporting or monitoring program required by paragraph (1) of subdivision (a) of Section 21081.6, if the lead agency releases those documents subsequent to the release of the draft environmental impact report.
(E)New information that was not reasonably known and could not have been reasonably known during the public comment period.
(7)The lead agency shall file the notice required by subdivision (a) of Section 21152 within five calendar days after the last initial project approval.
(f)(1)The lead agency shall prepare and certify the record of proceedings in accordance with this subdivision and in accordance with Rule 3.2205 of the California Rules of Court.
(2)No later than three business days following the date of the release of the draft environmental impact report, the lead agency shall make available to the public in a readily accessible electronic format the draft environmental impact report and all other documents relied on by the lead agency in the preparation of the draft environmental impact report. A document prepared by the lead agency after the date of the release of the draft environmental impact report that is a part of the record of proceedings shall be made available to the public in a readily accessible electronic format within five business days after the document is prepared by the lead agency.
(3)Notwithstanding paragraph (2), documents relied on by the lead agency that were not prepared specifically for the project and are copyright protected are not required to be made readily accessible in an electronic format. For those copyright protected documents, the lead agency shall make an index of the documents available in an electronic format no later than the date of the release of the draft environmental impact report, or within five business days if the document is received or relied on by the lead agency after the release of the draft environmental impact report. The index shall specify the libraries or lead agency offices in which hardcopies of the copyrighted materials are available for public review.
(4)The lead agency shall encourage written comments on the project to be submitted in a readily accessible electronic format, and shall make any such comments available to the public in a readily accessible electronic format within five calendar days of their receipt.
(5)Within seven business days after the receipt of any comment that is not in an electronic format, the lead agency shall convert that comment into a readily accessible electronic format and make it available to the public in that format.
(6)The lead agency shall indicate in the record of proceedings comments received that were not considered by the lead agency pursuant to paragraph (6) of subdivision (e) and need not include the content of the comments as a part of the record of proceedings.
(7)Within five calendar days after the filing of the notice required by subdivision (a) of Section 21152, the lead agency shall certify the record of proceedings for the approval or determination and shall provide an electronic copy of the record of proceedings to a party that has submitted a written request for a copy. The lead agency may charge and collect a reasonable fee from a party requesting a copy of the record of proceedings for the electronic copy, which shall not exceed the reasonable cost of reproducing that copy.
(8)Within 10 calendar days after being served with a complaint or a petition for a writ of mandate, the lead agency shall lodge a copy of the certified record of proceedings with the superior court.
(9)Any dispute over the content of the record of proceedings shall be resolved by the superior court. Unless the superior court directs otherwise, a party disputing the content of the record of proceedings shall file a motion to augment the record of proceedings at the time it files its initial brief.
(10)The contents of the record of proceedings shall be as set forth in subdivision (e) of Section 21167.6.
(g)(1)Except as provided in paragraph (2), this section applies only to an environmental leadership transit project in either of the following circumstances:
(A)The project is initially approved by the lead agency on or before January 1, 2027.
(B)The draft environmental impact report for the project is initially circulated before January 1, 2025.
(2)Paragraph (1) does not apply to actions or proceedings challenging an action taken by a public agency, including, but not limited to, a responsible agency and trustee agency, on the grounds of noncompliance with the law, after the initial approval by the lead agency.
(h)This section shall only apply to the first seven projects obtaining a certified environmental impact report and meeting the requirements of this section.
SEC. 4.The provisions of this act are severable. If any provision of this act or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
SEC. 4.SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)(1)(A)This division does not apply to an active transportation plan, a pedestrian plan, or a bicycle transportation plan for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
(B)This division does not apply to a transit comprehensive operational analysis, transit route readjustment, or other transit agency route addition, elimination, or modification.
(2)An active transportation plan or pedestrian plan is encouraged to include the consideration of environmental factors, but that consideration does not inhibit or preclude the application of this section.
(3) An individual project that is a part of an active transportation plan, pedestrian plan, or transit comprehensive operational analysis remains subject to this division unless another exemption applies to that project.
(b)Before determining that a project described in subdivision (a) is exempt pursuant to this section, the lead agency shall hold noticed public hearings in areas affected by the project to hear and respond to public comments. Publication of the notice shall be no fewer times than required by Section 6061 of the Government Code by the public agency in a newspaper of general circulation in the area affected by the proposed project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(c)If a local agency determines that a project is not subject to this division pursuant to this section and it determines to approve or carry out that project, the notice shall be filed with the Office of Land Use and Climate Innovation and the county clerk in the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(d)For purposes of this section, the following definitions apply:
(1)Active transportation plan means a plan developed by a local jurisdiction that promotes and encourages people to choose walking, bicycling, or rolling through the creation of safe, comfortable, connected, and accessible walking, bicycling, or rolling networks, and encourages alternatives to single-occupancy vehicle trips.
(2)Pedestrian plan means a plan developed by a local jurisdiction that establishes a comprehensive, coordinated approach to improving pedestrian infrastructure and safety.
(3)Transit comprehensive operational analysis means a plan that redesigns or modifies a transit operators or local agencys public transit service network, including the routing of fixed route and microtransit services.
SEC. 2.Section 21080.25 of the Public Resources Code is amended to read:21080.25.(a)For purposes of this section, the following definitions apply:
(1)Affordable housing means any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents or sales prices to levels affordable, as defined in Section 50052.5 or 50053 of the Health and Safety Code, to persons and families of moderate, lower, or very low income, as defined in Section 50079.5, 50093, or 50105 of the Health and Safety Code, respectively.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that had been occupied by tenants within five years from the date of approval of the development agreement by a primary tenant who was low income and did not leave voluntarily.
(2)Bicycle facilities includes, but is not limited to, bicycle parking, bicycle sharing facilities, and bikeways as defined in Section 890.4 of the Streets and Highways Code.
(3)High-occupancy vehicle means a vehicle with three or more occupants.
(4)Highway means a way or place of whatever nature, publicly maintained and open to the use of the public for purposes of vehicular travel. Highway includes a street.
(5)Local agency means a public transit operator, city, county, city and county, special district, joint powers authority, local or regional transportation agency, or congestion management agency.
(6)Part-time transit lanes means designated highway shoulders that support the operation of transit vehicles during specified times and are not open to nonpublic transit vehicles at any time.
(7)Project labor agreement has the same meaning as defined in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(8)Public transit operator has the same meaning as operator in Section 99210 of the Public Utilities Code, or means a public entity that provides contracted paratransit services.
(9)Skilled and trained workforce has the same meaning as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(10)Transit lanes means street design elements that delineate space within the roadbed as exclusive to transit use, either full or part time.
(11)Transit prioritization projects means any of the following transit project types on highways or in the public right-of-way:
(A)Signal and sign changes, such as signal coordination, signal timing modifications, signal modifications, or the installation of traffic signs or new signals.
(B)The installation of wayside technology and onboard technology.
(C)The installation of ramp meters.
(D)The conversion to dedicated transit lanes, including transit queue jump or bypass lanes, shared turning lanes and turn restrictions, the narrowing of lanes to allow for dedicated transit lanes or transit reliability improvements, or the widening of existing transit travel lanes by removing or restricting street parking.
(E)Transit stop access and safety improvements, including, but not limited to, the installation of bus shelters, lighting, transit bulbs, and the installation of transit boarding landings and islands.
(12)Transportation demand management program means a specific program of strategies, incentives, and tools to be implemented, including, with specified annual status reporting obligations, to reduce vehicle trips by providing opportunities for the public to choose sustainable travel options, such as transit, bicycle riding, or walking. A specific program of strategies, incentives, and tools includes, but is not limited to, any of the following:
(A)Provision of onsite electric vehicle charging stations in excess of applicable requirements.
(B)Provision of dedicated parking for car share or zero-emission vehicles, or both types of vehicles, in excess of applicable requirements.
(C)Provision of bicycle parking in excess of applicable requirements.
(b)This division does not apply to any of the following projects:
(1)Pedestrian and bicycle facilities that improve safety, access, or mobility, including new facilities, within the public right-of-way.
(2)Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians within the public right-of-way.
(3)Transit prioritization projects.
(4)A project for the designation and conversion of general purpose lanes to high-occupancy vehicle lanes or bus-only lanes, or highway shoulders to part-time transit lanes, for use either during peak congestion hours or all day on highways with existing public transit service or where a public transit agency will be implementing public transit service as identified in a short-range transit plan.
(5)(A)A public project for the improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, passenger rail, or light rail service, including the maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, vessels, or certified Tier 4 or cleaner locomotives, as provided in Section 1033.101 of Title 40 of the Code of Federal Regulations. or vessels.
(B)A public project otherwise identified in subparagraph (A) shall not apply to the exemption pursuant to this paragraph after January 1, 2040, 2032, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, or hybrid powertrain vehicles, or certified Tier 4 or cleaner locomotives, as provided in Section 1033.101 of Title 40 of the Code of Federal Regulations. vehicles. This subparagraph shall not apply to a public project otherwise identified in subparagraph (A) used by articulated buses.
(C)A public project for the construction or rehabilitation of a ferry terminal that a lead agency has submitted a notice of preparation for an environmental impact report pursuant to Section 21092 before January 1, 2026, shall not apply to the exemption pursuant to this paragraph.
(D)A public project for transit services operated by a transportation network company, as defined in Section 5431 of the Public Utilities Code, shall not apply to the exemption pursuant to this paragraph, unless the services are operated by a microtransit provider contracted by the lead agency that uses a managed fleet of multipassenger vehicles dedicated to that service.
(6)(A)A public project for the institution improvement, institution, or increase of passenger rail service, other than light rail service eligible under paragraph (5), including the construction maintenance, construction, or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains. trains or certified Tier 4 or cleaner rolling stock or locomotives, as provided in Section 1033.101 of Title 40 of the Code of Federal Regulations.
(B)A public project otherwise identified in subparagraph (A) shall not apply to the exemption pursuant to this paragraph after January 1, 2040, if used primarily by certified Tier 4 or cleaner rolling stock or locomotives that are not zero-emission rolling stock or locomotives.
(7)(A)A public project to construct or maintain infrastructure or facilities to charge, refuel, power, or maintain zero-emission public transit buses, trains, or ferries, provided the project is carried out by a public transit agency in compliance with, the State Air Resources Boards Innovative Clean Transit regulations (Article 4.3 (commencing with Section 2023) of Chapter 1 of Division 3 of Title 13 of the California Code of Regulations), the Commercial Harbor Craft regulations (Article 4.3 (commencing with Section 2299.5) of Chapter 5.1 of Division 3 of Title 13 of the California Code of Regulations and Article 4.3 (commencing with Section 93118.5) of Chapter 1 of Division 3 of Title 17 of the California Code of Regulations), the In-Use Locomotive regulations (Article 8 (commencing with Section 2478) of Chapter 9 of Division 3 of Title 13 of the California Code of Regulations), or any regulations identified by the State Air Resources Boards 2020 Mobile Source Strategy, adopted on October 28, 2021.
(B)A lead agency applying an exemption pursuant to this paragraph for hydrogen refueling infrastructure or facilities necessary to refuel or maintain zero-emission public transit buses, trains, or ferries shall comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(8)The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with a project identified in paragraphs (1) to (7), inclusive.
(9)A project that consists exclusively of a combination of any of the components of a project identified in paragraphs (1) to (8), inclusive.
(10)A planning decision carried out by a local agency to reduce or eliminate minimum parking requirements or institute parking maximums, remove or restrict parking, or implement transportation demand management requirements or programs.
(c)Except as provided in subdivision (g), a project exempt from this division under this section shall meet all of the following criteria:
(1)(A)A local agency is carrying out the project and is the lead agency for the project.
(B)The lead agency shall take an action to approve a project as follows:
(i)The lead agencys governing board shall take an action at a public meeting.
(ii)Notwithstanding clause (i), if a lead agency has an alternative project approval process for a project subject to subdivision (b), it may instead follow that alternative process.
(2)The project does not induce single-occupancy vehicle trips, add additional highway lanes, widen highways, or add physical infrastructure or striping to highways except for minor modifications needed for the efficient and safe movement of transit vehicles, bicycles, or high-occupancy vehicles, such as extended merging lanes, shoulder improvements, or improvements to the roadway within the existing right-of-way. The project shall not include the addition of any auxiliary lanes.
(3)The construction of the project shall not require the demolition of affordable housing units.
(4)For a project subject to paragraphs (5) to (7), inclusive, of subdivision (b), the project shall be located within existing public right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for rail or public mass transit, or an existing rail right-of-way, whether or not the right-of-way is in use for passenger rail transit, on property owned, leased, or operated by the local agency, or on property owned by a public or private utility.
(d)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed one hundred million dollars ($100,000,000) shall also meet all of the following criteria:
(A)The project is incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review pursuant to this division within 10 years of the approval of the project.
(B)The projects construction impacts are fully mitigated consistent with applicable law.
(C)(i)The lead agency shall complete and consider the results of a project business case and a racial equity analysis. The Office of Land Use and Climate Innovation may set guidelines for the project business case and the racial equity analysis or delegate that authority to metropolitan planning organizations.
(ii)The racial equity analysis required under this subparagraph shall identify the racial equity impacts of the project, identify who will benefit from and be burdened by the project, and, where significant or disproportionate impacts exist, suggest strategies, designs, or actions to mitigate those impacts.
(D)The lead agency shall hold noticed public meetings as follows:
(i)Before determining that a project is exempt pursuant to this section, the lead agency shall hold at least three noticed public meetings in the project area to hear and respond to public comments.
(ii)At least one of the three public meetings shall review the project business case and the racial equity analysis. The review of these documents does not inhibit or preclude application of this section.
(iii)The lead agency shall conduct at least two noticed public meetings annually during project construction for the public to provide comments.
(iv)The public meetings held pursuant to clauses (i) to (iii), inclusive, shall be in the form of either a public community planning meeting held in the project area or in the form of a regularly scheduled meeting of the governing body of the lead agency.
(E)The lead agency shall give public notice of the meetings in subparagraph (D) to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the lead agencys internet website and social media accounts.
(2)In addition to the requirements of paragraph (1), for a project described in that paragraph for which at least 50 percent of the project or projects stops and stations are located in an area that is at risk of residential displacement and that will have a maximum of 15-minute peak headways, the local agency shall complete an analysis of residential displacement and suggest antidisplacement strategies, designs, or actions. For a project subject to this paragraph, the lead agency shall define or identify areas at risk of residential displacement.
(3)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(e)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed fifty million dollars ($50,000,000) shall also comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(2)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(f)(1)(A)Except as provided in subdivision (g), as part of the lead agencys governing board action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), the lead agency shall certify that the project will be completed by a skilled and trained workforce.
(B)Subparagraph (A) does not apply if the lead agency has an existing policy or certification approved by its governing board that requires the use of a skilled and trained workforce to complete the project if the lead agency is a signatory to a project labor agreement that will require the use of a skilled and trained workforce on the project.
(2)(A)Except as provided in subparagraph (B), for a project that is exempted under this section, the lead agency shall not enter into a construction contract with any entity unless the entity provides to the lead agency an enforceable commitment that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or a contract that falls within an apprenticeship occupation in the building and construction trades in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)Subparagraph (A) does not apply if any of the following requirements are met:
(i)The lead agency has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project to use a skilled and trained workforce and the entity has agreed to be bound by that project labor agreement.
(ii)The project or contract is being performed under the extension or renewal of a project labor agreement that was entered into by the lead agency before January 1, 2021.
(iii)The entity contracted to perform the project entered into a project labor agreement that will bind the entity and all its subcontractors at every tier performing the project to use a skilled and trained workforce.
(g)Subdivisions (c) and (f) do not apply to a project described in paragraph (10) of subdivision (b).
(h)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to carry out that project, the lead agency shall file a notice of exemption with the Office of Land Use and Climate Innovation and the county clerk of the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(i)(1)The amendments made to paragraph (5) of subdivision (b) by Chapter 987 of the Statutes of 2022 (Senate Bill 922 of the 202122 Regular Session) may apply to projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023.
(2)For projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023, notwithstanding subdivision (d), as it read on December 31, 2022, the lead agency may certify that the project will be completed by a skilled and trained workforce after the granting of the exemption under this section or the lead agency may demonstrate compliance with subparagraph (B) of paragraph (1) of subdivision (f).
(j)(1)Beginning January 1, 2026, and every two years thereafter, the Office of Land Use and Climate Innovation shall adjust the amounts reflected in paragraph (1) of subdivision (c) and paragraph (1) of subdivision (e) to reflect changes in the Consumer Price Index, as indicated in the Consumer Price Index for All Urban Consumers, as calculated by the Department of Finance based on the United States Bureau of Labor Statistics data for the most recent odd-numbered year, and publish the updated amounts on its internet website.
(2)Notwithstanding the rulemaking provisions of the Administrative Procedure Act (Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code), the Office of Land Use and Climate Innovation may implement, interpret, or make specific this subdivision without taking any regulatory action.
SEC. 3.Section 21168.6.9 of the Public Resources Code is amended to read:21168.6.9.(a)For purposes of this section, the following definitions apply:
(1)Environmental leadership transit project or project means a project to construct a fixed guideway and related fixed facilities that meets all of the following conditions:
(A)The fixed guideway operates at zero emissions.
(B)(i)If the project is more than two miles in length, the project reduces emissions by no less than 400,000 metric tons of greenhouse gases directly in the corridor of the project defined in the applicable environmental document over the useful life of the project, without using offsets.
(ii)If the project is no more than two miles in length, the project reduces emissions by no less than 50,000 metric tons of greenhouse gases directly in the corridor of the project defined in the applicable environmental document over the useful life of the project, without using offsets.
(C)The project reduces no less than 30,000,000 vehicle miles traveled in the corridor of the project defined in the applicable environmental document over the useful life of the project.
(D)The project is consistent with the applicable sustainable communities strategy or alternative planning strategy.
(E)The project is consistent with the applicable regional transportation plan.
(F)The project applicant demonstrates how it has incorporated sustainable infrastructure practices to achieve sustainability, resiliency, and climate change mitigation and adaptation goals in the project, including principles, frameworks, or guidelines as recommended by one or more of the following:
(i)The sustainability, resiliency, and climate change policies and standards of the American Society of Civil Engineers.
(ii)The Envision Rating System of the Institute for Sustainable Infrastructure.
(iii)The Leadership in Energy and Environment Design (LEED) rating system of the United States Green Building Council.
(G)The environmental leadership transit project is located wholly within the County of Los Angeles or connects to an existing transit project wholly located in the County of Los Angeles.
(H)For a project meeting the requirements of subparagraphs (A) to (G), inclusive, for which the environmental review pursuant to this division has commenced before January 1, 2022, the project applicant demonstrates that the record of proceedings is being, or has been, prepared in accordance with subdivision (f).
(2)Fixed guideway has the same meaning as defined in Section 5302 of Title 49 of the United States Code.
(3)Project applicant means a public or private entity or its affiliates that proposes an environmental leadership transit project, and its successors, heirs, and assignees.
(4)Project labor agreement has the same meaning as in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(5)Skilled and trained workforce has the same meaning as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(b)This section applies to an environmental leadership transit project if the project applicant does all of the following:
(1)The project applicant demonstrates compliance with the requirements of Chapter 12.8 (commencing with Section 42649) and Chapter 12.9 (commencing with Section 42649.8) of Part 3 of Division 30, as applicable.
(2)(A)Except as provided in subparagraph (B), the project applicant has entered into a binding and enforceable agreement that all mitigation measures required under this division shall be conditions of approval of the project, and those conditions will be fully enforceable by the lead agency or another agency designated by the lead agency. In the case of environmental mitigation measures, the project applicant agrees, as an ongoing obligation, that those measures will be monitored and enforced by the lead agency for the life of the obligation.
(B)For a project applicant that is a public agency and is also the lead agency, the public agency conditions the approval of the environmental leadership transit project on, and performs, all mitigation measures required under this division. In the case of environmental mitigation measures, the public agency, as an ongoing obligation, shall monitor those measures for the life of the obligation.
(3)The project applicant agrees to pay the costs of the trial court and the court of appeal in hearing and deciding any case challenging a lead agencys action on an environmental leadership transit project under this division, including payment of the costs for the appointment of a special master if deemed appropriate by the court, in a form and manner specified by the Judicial Council, as provided in the California Rules of Court adopted by the Judicial Council under subdivision (d).
(4)The project applicant agrees to bear the costs of preparing the record of proceedings for the project concurrent with review and consideration of the project under this division, in a form and manner specified by the lead agency for the project.
(c)(1)(A)If the project applicant is a public agency, the project applicant of an environmental leadership transit project shall obtain an enforceable commitment that any bidder, contractor, or other entity undertaking the project will use a skilled and trained workforce to complete the project.
(B)Subparagraph (A) does not apply if either of the following are met:
(i)The project applicant has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project to use a skilled and trained workforce.
(ii)The bidder, contractor, or other entity has entered into a project labor agreement that will bind all contractors and subcontractors at every tier performing work on the project to use a skilled and trained workforce.
(2)If the project applicant is a private entity, the project applicant of an environmental leadership transit project shall do both of the following:
(A)Certify to the lead agency that either of the following is true:
(i)The entirety of the project is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(ii)If the project is not in its entirety a public work and the project applicant is not required to pay prevailing wages to all construction workers under Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code, all construction workers employed on construction of the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the project is subject to this clause, then for those portions of the project that are not a public work all of the following shall apply:
(I)The project applicant shall ensure that the prevailing wage requirement is included in all contracts for the performance of all construction work.
(II)All contractors and subcontractors at every tier shall pay to all construction workers employed in the execution of the work at least the general prevailing rate of per diem wages, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.
(III)Except as provided in subclause (V), all contractors and subcontractors at every tier shall maintain and verify payroll records pursuant to Section 1776 of the Labor Code and make those records available for inspection and copying as provided by that section.
(IV)Except as provided in subclause (V), the obligation of the contractors and subcontractors at every tier to pay prevailing wages may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of the project, or by an underpaid worker through an administrative complaint or civil action, or by a joint labor-management committee through a civil action under Section 1771.2 of the Labor Code. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond or bonds issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.
(V)Subclauses (III) and (IV) do not apply if all contractors and subcontractors at every tier performing work on the project are subject to a project labor agreement that requires the payment of prevailing wages to all construction workers employed in the execution of the project and provides for enforcement of that obligation through an arbitration procedure.
(VI)Notwithstanding subdivision (c) of Section 1773.1 of the Labor Code, the requirement that employer payments not reduce the obligation to pay the hourly straight time or overtime wages found to be prevailing shall not apply if otherwise provided in a bona fide collective bargaining agreement covering the worker. The requirement to pay at least the general prevailing rate of per diem wages does not preclude use of an alternative workweek schedule adopted pursuant to Section 511 or 514 of the Labor Code.
(B)Certify to the lead agency that a skilled and trained workforce will be used to perform all construction work on the project. All of the following requirements shall apply to the project:
(i)The project applicant shall require in all contracts for the performance of work that every contractor and subcontractor at every tier will individually use a skilled and trained workforce to construct the project.
(ii)Every contractor and subcontractor at every tier shall use a skilled and trained workforce to construct the project.
(iii)(I)Except as provided in subclause (II), the project applicant shall provide to the lead agency, on a monthly basis while the project or contract is being performed, a report demonstrating compliance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code. A monthly report provided to the lead agency pursuant to this subclause shall be a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code) and shall be open to public inspection. A project applicant that fails to provide a monthly report demonstrating compliance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code shall be subject to a civil penalty of ten thousand dollars ($10,000) per month for each month for which the report has not been provided. Any contractor or subcontractor that fails to use a skilled and trained workforce shall be subject to a civil penalty of two hundred dollars ($200) per calendar day for each worker employed in contravention of the skilled and trained workforce requirement. Penalties may be assessed by the Labor Commissioner within 18 months of completion of the project using the same procedures for issuance of civil wage and penalty assessments pursuant to Section 1741 of the Labor Code, and may be reviewed pursuant to the same procedures in Section 1742 of the Labor Code. Penalties shall be paid to the State Public Works Enforcement Fund.
(II)Subclause (I) shall not apply if all contractors and subcontractors at every tier performing work on the project are subject to a project labor agreement that requires compliance with the skilled and trained workforce requirement and provides for enforcement of that obligation through an arbitration procedure.
(d)(1)On or before January 1, 2023, the Judicial Council shall adopt rules of court that apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of an environmental impact report for an environmental leadership transit project or the granting of any project approval that require the action or proceeding, including any potential appeals to the court of appeal or the Supreme Court, to be resolved, to the extent feasible, within 365 calendar days of the filing of the certified record of proceedings with the court.
(2)(A)An action or proceeding brought to attack, review, set aside, void, or annul an action or approval of a public agency, including, but not limited to, a responsible agency and a trustee agency, in furtherance of an environmental leadership transit project on the grounds of noncompliance with any law, including any potential appeals to the court of appeal or the Supreme Court, shall be resolved, to the extent feasible, within 365 calendar days of the filing of the certified record of proceedings for the challenged action or approval. On or before July 1, 2026, the Judicial Council shall adopt rules of court to implement this subparagraph.
(B)Before the adoption of the rule of court pursuant to subparagraph (A), the following apply to actions or proceedings subject to this paragraph:
(i)The respondent public agency shall lodge with the court the certified record of proceedings in electronic form within 10 days of the service of the action or proceeding.
(ii)(I)Except as provided in subclause (II), the petitioner shall file and serve its opening brief within 45 days of the lodging of the certified record of proceedings.
(II)If the petitioner filed and served the petition within 10 days of the commencement of the relevant limitation period for the action or proceeding, the opening brief shall be filed and served within 55 days of the lodging of the certified record of proceeding.
(iii)The hearing on the merits shall be held, to the extent feasible, within 100 days of the lodging of the certified record of proceedings. This time period may be extended by stipulation of the parties.
(iv)To the extent not inconsistent with clauses (i) to (iii), inclusive, Division 22 (commencing with Rule 3.2200) of Title 3 of, and Chapter 1 (commencing with Rule 8.700) of Division 3 of Title 8 of, the California Rules of Court shall apply to actions and proceedings subject to this paragraph.
(C)For an action or proceeding brought, in calendar year 2025, against an environmental leadership transit project approved in that calendar year, this paragraph shall apply to the maximum extent feasible.
(e)(1)(A)The draft and final environmental impact report for an environmental leadership transit project shall include a notice in not less than 12-point type stating the following:
THIS ENVIRONMENTAL IMPACT REPORT IS SUBJECT TO SECTION 21168.6.9 OF
THE PUBLIC RESOURCES CODE, WHICH PROVIDES, AMONG OTHER THINGS, THAT THE LEAD AGENCY NEED NOT CONSIDER CERTAIN COMMENTS FILED AFTER THE CLOSE OF THE PUBLIC COMMENT PERIOD, IF ANY, FOR THE DRAFT ENVIRONMENTAL IMPACT REPORT. ANY JUDICIAL ACTION CHALLENGING THE CERTIFICATION OR ADOPTION OF THE ENVIRONMENTAL IMPACT REPORT OR THE APPROVAL OF THE PROJECT DESCRIBED IN SECTION 21168.6.9 OF THE PUBLIC RESOURCES CODE IS SUBJECT TO THE PROCEDURES SET FORTH IN THAT SECTION. A COPY OF SECTION 21168.6.9 OF THE PUBLIC RESOURCES CODE IS INCLUDED IN THE APPENDIX TO THIS ENVIRONMENTAL IMPACT REPORT.
(B)For an environmental leadership transit project for which a draft environmental impact report was issued before January 1, 2022, the lead agency shall, before February 1, 2022, or before the public hearing on the certification of the environmental impact report, whichever is earlier, provide the notice specified in subparagraph (A), in writing, to all parties that have requested notification regarding the project. The lead agency shall include that notice and the appendix required pursuant to paragraph (2) in the final environmental impact report for the project.
(C)For an environmental leadership transit project for which a final environmental impact report was issued before January 1, 2022, the lead agency shall, before February 1, 2022, or before the issuance of the notice of determination, whichever is earlier, do both of the following:
(i)Issue an addendum to the final environmental impact report containing the notice specified in subparagraph (A) and the appendix required pursuant to paragraph (2).
(ii)Provide notice, in writing, of the addendum to all parties that have requested notification regarding the project.
(2)The draft environmental impact report and final environmental impact report shall contain, as an appendix, the full text of this section.
(3)Within 10 calendar days after the release of the draft environmental impact report, the lead agency shall conduct an informational workshop to inform the public of the key analyses and conclusions of that document, as applicable.
(4)Within 10 calendar days before the close of the public comment period, the lead agency shall hold a public hearing to receive testimony on the draft environmental impact report. A transcript of the hearing shall be included as an appendix to the final environmental impact report, as applicable.
(5)(A)Within five calendar days following the close of the public comment period, a commenter on the draft environmental impact report may submit to the lead agency a written request for nonbinding mediation, as applicable. The lead agency shall participate in nonbinding mediation with all commenters who submitted timely comments on the draft environmental impact report and who requested the mediation. Mediation conducted pursuant to this paragraph shall end no later than 35 calendar days after the close of the public comment period.
(B)A request for mediation shall identify all areas of dispute raised in the comment submitted by the commenter that are to be mediated.
(C)The lead agency shall select one or more mediators who shall be retired judges or recognized experts with at least five years experience in land use and environmental law or science, or mediation. The lead agency shall bear the costs of mediation.
(D)A mediation session shall be conducted on each area of dispute with the parties requesting mediation on that area of dispute.
(E)The lead agency shall adopt, as a condition of approval, any measures agreed upon by the lead agency and any commenter who requested mediation. A commenter who agrees to a measure pursuant to this subparagraph shall not raise the issue addressed by that measure as a basis for an action or proceeding challenging the lead agencys decision to certify the environmental impact report or to grant project approval.
(6)The lead agency need not consider written comments on the draft environmental impact report submitted after the close of the public comment period, unless those comments address any of the following:
(A)New issues raised in the response to comments by the lead agency.
(B)New information released by the lead agency subsequent to the release of the draft environmental impact report, such as new information set forth or embodied in a staff report, proposed permit, proposed resolution, ordinance, or similar documents.
(C)Changes made to the project after the close of the public comment period.
(D)Proposed conditions for approval, mitigation measures, or proposed findings required by Section 21081 or a proposed reporting or monitoring program required by paragraph (1) of subdivision (a) of Section 21081.6, if the lead agency releases those documents subsequent to the release of the draft environmental impact report.
(E)New information that was not reasonably known and could not have been reasonably known during the public comment period.
(7)The lead agency shall file the notice required by subdivision (a) of Section 21152 within five calendar days after the last initial project approval.
(f)(1)The lead agency shall prepare and certify the record of proceedings in accordance with this subdivision and in accordance with Rule 3.2205 of the California Rules of Court.
(2)No later than three business days following the date of the release of the draft environmental impact report, the lead agency shall make available to the public in a readily accessible electronic format the draft environmental impact report and all other documents relied on by the lead agency in the preparation of the draft environmental impact report. A document prepared by the lead agency after the date of the release of the draft environmental impact report that is a part of the record of proceedings shall be made available to the public in a readily accessible electronic format within five business days after the document is prepared by the lead agency.
(3)Notwithstanding paragraph (2), documents relied on by the lead agency that were not prepared specifically for the project and are copyright protected are not required to be made readily accessible in an electronic format. For those copyright protected documents, the lead agency shall make an index of the documents available in an electronic format no later than the date of the release of the draft environmental impact report, or within five business days if the document is received or relied on by the lead agency after the release of the draft environmental impact report. The index shall specify the libraries or lead agency offices in which hardcopies of the copyrighted materials are available for public review.
(4)The lead agency shall encourage written comments on the project to be submitted in a readily accessible electronic format, and shall make any such comments available to the public in a readily accessible electronic format within five calendar days of their receipt.
(5)Within seven business days after the receipt of any comment that is not in an electronic format, the lead agency shall convert that comment into a readily accessible electronic format and make it available to the public in that format.
(6)The lead agency shall indicate in the record of proceedings comments received that were not considered by the lead agency pursuant to paragraph (6) of subdivision (e) and need not include the content of the comments as a part of the record of proceedings.
(7)Within five calendar days after the filing of the notice required by subdivision (a) of Section 21152, the lead agency shall certify the record of proceedings for the approval or determination and shall provide an electronic copy of the record of proceedings to a party that has submitted a written request for a copy. The lead agency may charge and collect a reasonable fee from a party requesting a copy of the record of proceedings for the electronic copy, which shall not exceed the reasonable cost of reproducing that copy.
(8)Within 10 calendar days after being served with a complaint or a petition for a writ of mandate, the lead agency shall lodge a copy of the certified record of proceedings with the superior court.
(9)Any dispute over the content of the record of proceedings shall be resolved by the superior court. Unless the superior court directs otherwise, a party disputing the content of the record of proceedings shall file a motion to augment the record of proceedings at the time it files its initial brief.
(10)The contents of the record of proceedings shall be as set forth in subdivision (e) of Section 21167.6.
(g)This (1)Except as provided in paragraph (2), this section applies only to an environmental leadership transit project that in either of the following circumstances:
(A)The project is initially approved by the lead agency on or before January 1, 2025. 2027.
(B)The draft environmental impact report for the project is initially circulated before January 1, 2025.
(2)Paragraph (1) does not apply to actions or proceedings challenging an action taken by a public agency, including, but not limited to, a responsible agency and trustee agency, on the grounds of noncompliance with the law, after the initial approval by the lead agency.
(h)This section shall only apply to the first seven projects obtaining a certified environmental impact report and meeting the requirements of this section.
(i)This section shall remain in effect only until January 1, 2026, and as of that date is repealed.SEC. 3.SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)(1)(A)This division does not apply to an active transportation plan, a pedestrian plan, or a bicycle transportation plan for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
(B)This division does not apply to a transit comprehensive operational analysis, transit route readjustment, or other transit agency route addition, elimination, or modification.
(2)An active transportation plan or pedestrian plan is encouraged to include the consideration of environmental factors, but that consideration does not inhibit or preclude the application of this section.
(3) An individual project that is a part of an active transportation plan, pedestrian plan, or transit comprehensive operational analysis remains subject to this division unless another exemption applies to that project.
(b)Before determining that a project described in subdivision (a) is exempt pursuant to this section, the lead agency shall hold noticed public hearings in areas affected by the project to hear and respond to public comments. Publication of the notice shall be no fewer times than required by Section 6061 of the Government Code by the public agency in a newspaper of general circulation in the area affected by the proposed project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(c)If a local agency determines that a project is not subject to this division pursuant to this section and it determines to approve or carry out that project, the notice shall be filed with the Office of Planning and Research Land Use and Climate Innovation and the county clerk in the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(d)For purposes of this section, the following definitions apply:
(1)Active transportation plan means a plan developed by a local jurisdiction that promotes and encourages people to choose walking, bicycling, or rolling through the creation of safe, comfortable, connected, and accessible walking, bicycling, or rolling networks, and encourages alternatives to single-occupancy vehicle trips.
(2)Pedestrian plan means a plan developed by a local jurisdiction that establishes a comprehensive, coordinated approach to improving pedestrian infrastructure and safety.
(3)Transit comprehensive operational analysis means a plan that redesigns or modifies a transit operators or local agencys public transit service network, including the routing of fixed route and microtransit services.
SEC. 2.Section 21080.25 of the Public Resources Code is amended to read:21080.25.(a)For purposes of this section, the following definitions apply:
(1)Affordable housing means any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents or sales prices to levels affordable, as defined in Section 50052.5 or 50053 of the Health and Safety Code, to persons and families of moderate, lower, or very low income, as defined in Section 50079.5, 50093, or 50105 of the Health and Safety Code, respectively.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that had been occupied by tenants within five years from the date of approval of the development agreement by a primary tenant who was low income and did not leave voluntarily.
(2)Bicycle facilities includes, but is not limited to, bicycle parking, bicycle sharing facilities, and bikeways as defined in Section 890.4 of the Streets and Highways Code.
(3)High-occupancy vehicle means a vehicle with three or more occupants.
(4)Highway means a way or place of whatever nature, publicly maintained and open to the use of the public for purposes of vehicular travel. Highway includes a street.
(5)Local agency means a public transit operator, city, county, city and county, special district, joint powers authority, local or regional transportation agency, or congestion management agency.
(6)Part-time transit lanes means designated highway shoulders that support the operation of transit vehicles during specified times and are not open to nonpublic transit vehicles at any time.
(7)Project labor agreement has the same meaning as defined in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(8)Public transit operator has the same meaning as operator in Section 99210 of the Public Utilities Code, or means a public entity that provides contracted paratransit services.
(9)Skilled and trained workforce has the same meaning as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(10)Transit lanes means street design elements that delineate space within the roadbed as exclusive to transit use, either full or part time.
(11)Transit prioritization projects means any of the following transit project types on highways or in the public right-of-way:
(A)Signal and sign changes, such as signal coordination, signal timing modifications, signal modifications, or the installation of traffic signs or new signals.
(B)The installation of wayside technology and onboard technology.
(C)The installation of ramp meters.
(D)The conversion to dedicated transit lanes, including transit queue jump or bypass lanes, shared turning lanes and turn restrictions, the narrowing of lanes to allow for dedicated transit lanes or transit reliability improvements, or the widening of existing transit travel lanes by removing or restricting street parking.
(E)Transit stop access and safety improvements, including, but not limited to, the installation of bus shelters, lighting, transit bulbs bulbs, and the installation of transit boarding landings and islands.
(12)Transportation demand management program means a specific program of strategies, incentives, and tools to be implemented, including, with specified annual status reporting obligations, to reduce vehicle trips by providing opportunities for the public to choose sustainable travel options, such as transit, bicycle riding, or walking. A specific program of strategies, incentives, and tools includes, but is not limited to, any of the following:
(A)Provision of onsite electric vehicle charging stations in excess of applicable requirements.
(B)Provision of dedicated parking for car share or zero-emission vehicles, or both types of vehicles, in excess of applicable requirements.
(C)Provision of bicycle parking in excess of applicable requirements.
(b)This division does not apply to any of the following projects:
(1)Pedestrian and bicycle facilities that improve safety, access, or mobility, including new facilities, within the public right-of-way.
(2)Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians within the public right-of-way.
(3)Transit prioritization projects.
(4)A project for the designation and conversion of general purpose lanes to high-occupancy vehicle lanes or bus-only lanes, or highway shoulders to part-time transit lanes, for use either during peak congestion hours or all day on highways with existing public transit service or where a public transit agency will be implementing public transit service as identified in a short range short-range transit plan.
(5)(A)A public project for the improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, passenger rail, or light rail service, including the maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. The project shall be located on a site that is wholly within the boundaries of an urbanized area or urban cluster, as designated by the United States Census Bureau. vessels, or certified Tier 4 or cleaner locomotives, as provided in Section 1033.101 of Title 40 of the Code of Federal Regulations.
(B)A public project otherwise identified in subparagraph (A) shall not apply to the exemption pursuant to this paragraph after January 1, 2032, 2040, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, or hybrid powertrain vehicles. This paragraph vehicles, or certified Tier 4 or cleaner locomotives, as provided in Section 1033.101 of Title 40 of the Code of Federal Regulations. This subparagraph shall not apply to a public project otherwise identified in subparagraph (A) used by articulated buses.
(C)A public project for the construction or rehabilitation of a ferry terminal that a lead agency has submitted a notice of preparation for an environmental impact report pursuant to Section 21092 before January 1, 2026, shall not apply to the exemption pursuant to this paragraph.
(D)A public project for transit services operated by a transportation network company, as defined in Section 5431 of the Public Utilities Code, shall not apply to the exemption pursuant to this paragraph. paragraph, unless the services are operated by a microtransit provider contracted by the lead agency that uses a managed fleet of multipassenger vehicles dedicated to that service.
(6)A public project for the institution or increase of passenger rail service, other than light rail service eligible under paragraph (5), including the construction or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains.
(7)(A)A public project to construct or maintain infrastructure or facilities to charge, refuel, power, or maintain zero-emission public transit buses, trains, or ferries, provided the project is carried out by a public transit agency in compliance with, the State Air Resources Boards Innovative Clean Transit regulations (Article 4.3 (commencing with Section 2023) of Chapter 1 of Division 3 of Title 13 of the California Code of Regulations), the Commercial Harbor Craft regulations (Article 4.3 (commencing with Section 2299.5) of Chapter 5.1 of Division 3 of Title 13 of the California Code of Regulations and Article 4.3 (commencing with Section 93118.5) of Chapter 1 of Division 3 of Title 17 of the California Code of Regulations), the In-Use Locomotive regulations (Article 8 (commencing with Section 2478) of Chapter 9 of Division 3 of Title 13 of the California Code of Regulations), or any regulations identified by the State Air Resources Boards 2020 Mobile Source Strategy, adopted on October 28, 2021.
(B)A lead agency applying an exemption pursuant to this paragraph for hydrogen refueling infrastructure or facilities necessary to refuel or maintain zero-emission public transit buses, trains, or ferries shall comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(8)The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with a project identified in paragraphs (1) to (7), inclusive.
(9)A project that consists exclusively of a combination of any of the components of a project identified in paragraphs (1) to (8), inclusive.
(10)A planning decision carried out by a local agency to reduce or eliminate minimum parking requirements or institute parking maximums, remove or restrict parking, or implement transportation demand management requirements or programs.
(c)Except as provided in subdivision (g), a project exempt from this division under this section shall meet all of the following criteria:
(1)(A)A local agency is carrying out the project and is the lead agency for the project.
(B)The lead agency shall take an action to approve a project as follows:
(i)The lead agencys governing board shall take an action at a public meeting.
(ii)Notwithstanding clause (i), if a lead agency has an alternative project approval process for a project subject to subdivision (b), it may instead follow that alternative process.
(2)The project does not induce single-occupancy vehicle trips, add additional highway lanes, widen highways, or add physical infrastructure or striping to highways except for minor modifications needed for the efficient and safe movement of transit vehicles, bicycles, or high-occupancy vehicles, such as extended merging lanes, shoulder improvements, or improvements to the roadway within the existing right of way. right-of-way. The project shall not include the addition of any auxiliary lanes.
(3)The construction of the project shall not require the demolition of affordable housing units.
(4)For a project subject to paragraphs (5) to (7), inclusive, of subdivision (b), the project shall be located within existing public right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for rail or public mass transit, or an existing rail right-of-way, whether or not the right-of-way is in use for passenger rail transit, on property owned, leased, or operated by the local agency, or on property owned by a public or private utility.
(d)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed one hundred million dollars ($100,000,000) shall also meet all of the following criteria:
(A)The project is incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review pursuant to this division within 10 years of the approval of the project.
(B)The projects construction impacts are fully mitigated consistent with applicable law.
(C)(i)The lead agency shall complete and consider the results of a project business case and a racial equity analysis. The Office of Planning and Research Land Use and Climate Innovation may set guidelines for the project business case and the racial equity analysis or delegate that authority to metropolitan planning organizations.
(ii)The racial equity analysis required under this subparagraph shall identify the racial equity impacts of the project, identify who will benefit from and be burdened by the project, and, where significant or disproportionate impacts exist, suggest strategies, designs, or actions to mitigate those impacts.
(D)The lead agency shall hold noticed public meetings as follows:
(i)Before determining that a project is exempt pursuant to this section, the lead agency shall hold at least three noticed public meetings in the project area to hear and respond to public comments.
(ii)At least one of the three public meetings shall review the project business case and the racial equity analysis. The review of these documents does not inhibit or preclude application of this section.
(iii)The lead agency shall conduct at least two noticed public meetings annually during project construction for the public to provide comments.
(iv)The public meetings held pursuant to clauses (i) to (iii), inclusive, shall be in the form of either a public community planning meeting held in the project area or in the form of a regularly scheduled meeting of the governing body of the lead agency.
(E)The lead agency shall give public notice of the meetings in subparagraph (D) to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the lead agencys internet website and social media accounts.
(2)In addition to the requirements of paragraph (1), for a project described in that paragraph for which at least 50 percent of the project or projects stops and stations are located in an area that is at risk of residential displacement and that will have a maximum of 15-minute peak headways, the local agency shall complete an analysis of residential displacement and suggest antidisplacement strategies, designs, or actions. For a project subject to this paragraph, the lead agency shall define or identify areas at risk of residential displacement.
(3)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(e)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph(1) paragraph (1) of subdivision (c), anticipated to exceed fifty million dollars ($50,000,000) shall also comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(2)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(f)(1)(A)Except as provided in subdivision (g), as part of the lead agencys governing board action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), the lead agency shall certify that the project will be completed by a skilled and trained workforce.
(B)Subparagraph (A) does not apply if the lead agency has an existing policy or certification approved by its governing board that requires the use of a skilled and trained workforce to complete the project if the lead agency is a signatory to a project labor agreement that will require the use of a skilled and trained workforce on the project.
(2)(A)Except as provided in subparagraph (B), for a project that is exempted under this section, the lead agency shall not enter into a construction contract with any entity unless the entity provides to the lead agency an enforceable commitment that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or a contract that falls within an apprenticeship occupation in the building and construction trades in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)Subparagraph (A) does not apply if any of the following requirements are met:
(i)The lead agency has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project to use a skilled and trained workforce and the entity has agreed to be bound by that project labor agreement.
(ii)The project or contract is being performed under the extension or renewal of a project labor agreement that was entered into by the lead agency before January 1, 2021.
(iii)The entity contracted to perform the project entered into a project labor agreement that will bind the entity and all its subcontractors at every tier performing the project to use a skilled and trained workforce.
(g)Subdivisions (c) and (f) do not apply to a project described in paragraph (10) of subdivision (b).
(h)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to carry out that project, the lead agency shall file a notice of exemption with the Office of Planning and Research Land Use and Climate Innovation and the county clerk of the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(i)(1)The amendments made to paragraph (5) of subdivision (b) by Chapter 987 of the Statutes of 2022 (Senate Bill 922 of the 202122 Regular Session) may apply to projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023.
(2)For projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023, notwithstanding subdivision (d), as it read on December 31, 2022, the lead agency may certify that the project will be completed by a skilled and trained workforce after the granting of the exemption under this section or the lead agency may demonstrate compliance with subparagraph (B) of paragraph (1) of subdivision (f).
(j)Beginning January 1, 2026, and every two years thereafter, the Office of Land Use and Climate Innovation shall adjust the amounts reflected in paragraph (1) of subdivision (c) and paragraph (1) of subdivision (e) to reflect changes in the California Consumer Price Index, as indicated in the Consumer Price Index for All Urban Consumers, as calculated by the Department of Finance based on the United States Bureau of Labor Statistics data for the most recent odd-numbered year, and publish the updated amounts on its internet website.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)(1)(A)This division does not apply to an active transportation plan, a pedestrian plan, or a bicycle transportation plan for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
(B)This division does not apply to a transit comprehensive operational analysis, transit route readjustment, or other transit agency route addition, elimination, or modification.
(2)An active transportation plan or pedestrian plan is encouraged to include the consideration of environmental factors, but that consideration does not inhibit or preclude the application of this section.
(3) An individual project that is a part of an active transportation plan, pedestrian plan, or transit comprehensive operational analysis remains subject to this division unless another exemption applies to that project.
(b)Before determining that a project described in subdivision (a) is exempt pursuant to this section, the lead agency shall hold noticed public hearings in areas affected by the project to hear and respond to public comments. Publication of the notice shall be no fewer times than required by Section 6061 of the Government Code by the public agency in a newspaper of general circulation in the area affected by the proposed project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(c)If a local agency determines that a project is not subject to this division pursuant to this section and it determines to approve or carry out that project, the notice shall be filed with the Office of Planning and Research and the county clerk in the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(d)For purposes of this section, the following definitions apply:
(1)Active transportation plan means a plan developed by a local jurisdiction that promotes and encourages people to choose walking, bicycling, or rolling through the creation of safe, comfortable, connected, and accessible walking, bicycling, or rolling networks, and encourages alternatives to single-occupancy vehicle trips.
(2)Pedestrian plan means a plan developed by a local jurisdiction that establishes a comprehensive, coordinated approach to improving pedestrian infrastructure and safety.
(3)Transit comprehensive operational analysis means a plan that redesigns or modifies a transit operators or local agencys public transit service network, including the routing of fixed route and microtransit services.
SEC. 2.Section 21080.25 of the Public Resources Code is amended to read:21080.25.(a)For purposes of this section, the following definitions apply:
(1)Affordable housing means any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents or sales prices to levels affordable, as defined in Section 50052.5 or 50053 of the Health and Safety Code, to persons and families of moderate, lower, or very low income, as defined in Section 50079.5, 50093, or 50105 of the Health and Safety Code, respectively.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that had been occupied by tenants within five years from the date of approval of the development agreement by a primary tenant who was low income and did not leave voluntarily.
(2)Bicycle facilities includes, but is not limited to, bicycle parking, bicycle sharing facilities, and bikeways as defined in Section 890.4 of the Streets and Highways Code.
(3)High-occupancy vehicle means a vehicle with three or more occupants.
(4)Highway means a way or place of whatever nature, publicly maintained and open to the use of the public for purposes of vehicular travel. Highway includes a street.
(5)Local agency means a public transit operator, city, county, city and county, special district, joint powers authority, local or regional transportation agency, or congestion management agency.
(6)Part-time transit lanes means designated highway shoulders that support the operation of transit vehicles during specified times and are not open to nonpublic transit vehicles at any time.
(7)Project labor agreement has the same meaning as defined in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(8)Public transit operator has the same meaning as operator in Section 99210 of the Public Utilities Code, or means a public entity that provides contracted paratransit services.
(9)Skilled and trained workforce has the same meaning as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(10)Transit lanes means street design elements that delineate space within the roadbed as exclusive to transit use, either full or part time.
(11)Transit prioritization projects means any of the following transit project types on highways or in the public right-of-way:
(A)Signal and sign changes, such as signal coordination, signal timing modifications, signal modifications, or the installation of traffic signs or new signals.
(B)The installation of wayside technology and onboard technology.
(C)The installation of ramp meters.
(D)The conversion to dedicated transit lanes, including transit queue jump or bypass lanes, shared turning lanes and turn restrictions, the narrowing of lanes to allow for dedicated transit lanes or transit reliability improvements, or the widening of existing transit travel lanes by removing or restricting street parking.
(E)Transit stop access and safety improvements, including, but not limited to, the installation of bus shelters, lighting, transit bulbs and the installation of transit boarding landings and islands.
(12)Transportation demand management program means a specific program of strategies, incentives, and tools to be implemented, including, with specified annual status reporting obligations, to reduce vehicle trips by providing opportunities for the public to choose sustainable travel options, such as transit, bicycle riding, or walking. A specific program of strategies, incentives, and tools includes, but is not limited to, any of the following:
(A)Provision of onsite electric vehicle charging stations in excess of applicable requirements.
(B)Provision of dedicated parking for car share or zero-emission vehicles, or both types of vehicles, in excess of applicable requirements.
(C)Provision of bicycle parking in excess of applicable requirements.
(b)This division does not apply to any of the following projects:
(1)Pedestrian and bicycle facilities that improve safety, access, or mobility, including new facilities, within the public right-of-way.
(2)Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians within the public right-of-way.
(3)Transit prioritization projects.
(4)A project for the designation and conversion of general purpose lanes to high-occupancy vehicle lanes or bus-only lanes, or highway shoulders to part-time transit lanes, for use either during peak congestion hours or all day on highways with existing public transit service or where a public transit agency will be implementing public transit service as identified in a short range transit plan.
(5)(A)A public project for the improvement, institution, or increase of microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, or light rail service, including the maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain vehicles, rail or cable cars, rolling stock, or vessels. The project shall be located on a site that is wholly within the boundaries of an urbanized area or urban cluster, as designated by the United States Census Bureau.
(B)A public project otherwise identified in subparagraph (A) shall not apply to the exemption pursuant to this paragraph after January 1, 2032, if used primarily by near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, or hybrid powertrain vehicles. This paragraph shall not apply to a public project otherwise identified in subparagraph (A) used by articulated buses.
(B)(C)A public project for the construction or rehabilitation of a ferry terminal that a lead agency has submitted a notice of preparation for an environmental impact report pursuant to Section 21092 before January 1, 2026, shall not apply to the exemption pursuant to this paragraph.
(D)A public project for transit services operated by a transportation network company, as defined in Section 5431 of the Public Utilities Code, shall not apply to the exemption pursuant to this paragraph.
(6)A public project for the institution or increase of passenger rail service, other than light rail service eligible under paragraph (5), including the construction or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains.
(7)(A)A public project to construct or maintain infrastructure or facilities to charge, refuel, power, or maintain zero-emission public transit buses, trains, or ferries, provided the project is carried out by a public transit agency in compliance with, the State Air Resources Boards Innovative Clean Transit regulations (Article 4.3 (commencing with Section 2023) of Chapter 1 of Division 3 of Title 13 of the California Code of Regulations), the Commercial Harbor Craft regulations (Article 4.3 (commencing with Section 2299.5) of Chapter 5.1 of Division 3 of Title 13 of the California Code of Regulations and Article 4.3 (commencing with Section 93118.5) of Chapter 1 of Division 3 of Title 17 of the California Code of Regulations), the In-Use Locomotive regulations (Article 8 (commencing with Section 2478) of Chapter 9 of Division 3 of Title 13 of the California Code of Regulations), or any regulations identified by the State Air Resources Boards 2020 Mobile Source Strategy, adopted on October 28, 2021.
(B)A lead agency applying an exemption pursuant to this paragraph for hydrogen refueling infrastructure or facilities necessary to refuel or maintain zero-emission public transit buses, trains, or ferries shall comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(8)The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with a project identified in paragraphs (1) to (7), inclusive.
(9)A project that consists exclusively of a combination of any of the components of a project identified in paragraphs (1) to (8), inclusive.
(10)A planning decision carried out by a local agency to reduce or eliminate minimum parking requirements or institute parking maximums, remove or restrict parking, or implement transportation demand management requirements or programs.
(c)Except as provided in subdivision (g), a project exempt from this division under this section shall meet all of the following criteria:
(1)(A)A local agency is carrying out the project and is the lead agency for the project.
(B)The lead agency shall take an action to approve a project as follows:
(i)The lead agencys governing board shall take an action at a public meeting.
(ii)Notwithstanding clause (i), if a lead agency has an alternative project approval process for a project subject to subdivision (b), it may instead follow that alternative process.
(2)The project does not induce single-occupancy vehicle trips, add additional highway lanes, widen highways, or add physical infrastructure or striping to highways except for minor modifications needed for the efficient and safe movement of transit vehicles, bicycles, or high-occupancy vehicles, such as extended merging lanes, shoulder improvements, or improvements to the roadway within the existing right of way. The project shall not include the addition of any auxiliary lanes.
(3)The construction of the project shall not require the demolition of affordable housing units.
(4)For a project subject to paragraphs (5) to (7), inclusive, of subdivision (b), the project shall be located within existing public right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for rail or public mass transit, or an existing rail right-of-way, whether or not the right-of-way is in use for passenger rail transit, on property owned, leased, or operated by the local agency, or on property owned by a public or private utility.
(d)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed one hundred million dollars ($100,000,000) shall also meet all of the following criteria:
(A)The project is incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review pursuant to this division within 10 years of the approval of the project.
(B)The projects construction impacts are fully mitigated consistent with applicable law.
(C)(i)The lead agency shall complete and consider the results of a project business case and a racial equity analysis. The Office of Planning and Research may set guidelines for the project business case and the racial equity analysis or delegate that authority to metropolitan planning organizations.
(ii)The racial equity analysis required under this subparagraph shall identify the racial equity impacts of the project, identify who will benefit from and be burdened by the project, and, where significant or disproportionate impacts exist, suggest strategies, designs, or actions to mitigate those impacts.
(D)The lead agency shall hold noticed public meetings as follows:
(i)Before determining that a project is exempt pursuant to this section, the lead agency shall hold at least three noticed public meetings in the project area to hear and respond to public comments.
(ii)At least one of the three public meetings shall review the project business case and the racial equity analysis. The review of these documents does not inhibit or preclude application of this section.
(iii)The lead agency shall conduct at least two noticed public meetings annually during project construction for the public to provide comments.
(iv)The public meetings held pursuant to clauses (i) to (iii), inclusive, shall be in the form of either a public community planning meeting held in the project area or in the form of a regularly scheduled meeting of the governing body of the lead agency.
(E)The lead agency shall give public notice of the meetings in subparagraph (D) to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the lead agencys internet website and social media accounts.
(2)In addition to the requirements of paragraph (1), for a project described in that paragraph for which at least 50 percent of the project or projects stops and stations are located in an area that is at risk of residential displacement and that will have a maximum of 15-minute peak headways, the local agency shall complete an analysis of residential displacement and suggest antidisplacement strategies, designs, or actions. For a project subject to this paragraph, the lead agency shall define or identify areas at risk of residential displacement.
(3)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(e)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph(1) of subdivision (c), anticipated to exceed fifty million dollars ($50,000,000) shall also comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(2)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(f)(1)(A)Except as provided in subdivision (g), as part of the lead agencys governing board action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), the lead agency shall certify that the project will be completed by a skilled and trained workforce.
(B)Subparagraph (A) does not apply if the lead agency has an existing policy or certification approved by its governing board that requires the use of a skilled and trained workforce to complete the project if the lead agency is a signatory to a project labor agreement that will require the use of a skilled and trained workforce on the project.
(2)(A)Except as provided in subparagraph (B), for a project that is exempted under this section, the lead agency shall not enter into a construction contract with any entity unless the entity provides to the lead agency an enforceable commitment that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or a contract that falls within an apprenticeship occupation in the building and construction trades in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)Subparagraph (A) does not apply if any of the following requirements are met:
(i)The lead agency has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project to use a skilled and trained workforce and the entity has agreed to be bound by that project labor agreement.
(ii)The project or contract is being performed under the extension or renewal of a project labor agreement that was entered into by the lead agency before January 1, 2021.
(iii)The entity contracted to perform the project entered into a project labor agreement that will bind the entity and all its subcontractors at every tier performing the project to use a skilled and trained workforce.
(g)Subdivisions (c) and (f) do not apply to a project described in paragraph (10) of subdivision (b).
(h)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to carry out that project, the lead agency shall file a notice of exemption with the Office of Planning and Research and the county clerk of the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(i)(1)The amendments made to paragraph (5) of subdivision (b) by Chapter 987 of the Statutes of 2022 (Senate Bill 922 of the 202122 Regular Session) may apply to projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023.
(2)For projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023, notwithstanding subdivision (d), as it read on December 31, 2022, the lead agency may certify that the project will be completed by a skilled and trained workforce after the granting of the exemption under this section or the lead agency may demonstrate compliance with subparagraph (B) of paragraph (1) of subdivision (f).
(j)Beginning January 1, 2026, and every two years thereafter, the Office of Land Use and Climate Innovation shall adjust the amounts reflected in paragraph (1) of subdivision (c) and paragraph (1) of subdivision (e) to reflect changes in the California Consumer Price Index, and publish the updated amounts on its internet website.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)(1)(A)This division does not apply to an active transportation plan, a pedestrian plan, or a bicycle transportation plan for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
(B)This division does not apply to a transit comprehensive operational analysis, transit route readjustment, or other transit agency route addition, elimination, or modification.
(2)An active transportation plan or pedestrian plan is encouraged to include the consideration of environmental factors, but that consideration does not inhibit or preclude the application of this section.
(3) An individual project that is a part of an active transportation plan, pedestrian plan, or transit comprehensive operational analysis remains subject to this division unless another exemption applies to that project.
(b)Before determining that a project described in subdivision (a) is exempt pursuant to this section, the lead agency shall hold noticed public hearings in areas affected by the project to hear and respond to public comments. Publication of the notice shall be no fewer times than required by Section 6061 of the Government Code by the public agency in a newspaper of general circulation in the area affected by the proposed project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(c)If a local agency determines that a project is not subject to this division pursuant to this section and it determines to approve or carry out that project, the notice shall be filed with the Office of Planning and Research and the county clerk in the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(d)For purposes of this section, the following definitions apply:
(1)Active transportation plan means a plan developed by a local jurisdiction that promotes and encourages people to choose walking, bicycling, or rolling through the creation of safe, comfortable, connected, and accessible walking, bicycling, or rolling networks, and encourages alternatives to single-occupancy vehicle trips.
(2)Pedestrian plan means a plan developed by a local jurisdiction that establishes a comprehensive, coordinated approach to improving pedestrian infrastructure and safety.
(3)Transit comprehensive operational analysis means a plan that redesigns or modifies a transit operators or local agencys public transit service network, including the routing of fixed route and microtransit services.
SEC. 2.Section 21080.25 of the Public Resources Code is amended to read:21080.25.(a)For purposes of this section, the following definitions apply:
(1)Affordable housing means any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents or sales prices to levels affordable, as defined in Section 50052.5 or 50053 of the Health and Safety Code, to persons and families of moderate, lower, or very low income, as defined in Section 50079.5, 50093, or 50105 of the Health and Safety Code, respectively.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that had been occupied by tenants within five years from the date of approval of the development agreement by a primary tenant who was low income and did not leave voluntarily.
(2)Bicycle facilities includes, but is not limited to, bicycle parking, bicycle sharing facilities, and bikeways as defined in Section 890.4 of the Streets and Highways Code.
(3)High-occupancy vehicle means a vehicle with three or more occupants.
(4)Highway means a way or place of whatever nature, publicly maintained and open to the use of the public for purposes of vehicular travel. Highway includes a street.
(5)Local agency means a public transit operator, city, county, city and county, special district, joint powers authority, local or regional transportation agency, or congestion management agency.
(6)Part-time transit lanes means designated highway shoulders that support the operation of transit vehicles during specified times and are not open to nonpublic transit vehicles at any time.
(7)Project labor agreement has the same meaning as defined in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(8)Public transit operator has the same meaning as operator in Section 99210 of the Public Utilities Code. Code, or means a public entity that provides contracted paratransit services.
(9)Skilled and trained workforce has the same meaning as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(10)Transit lanes means street design elements that delineate space within the roadbed as exclusive to transit use, either full or part time.
(11)Transit prioritization projects means any of the following transit project types on highways or in the public right-of-way:
(A)Signal and sign changes, such as signal coordination, signal timing modifications, signal modifications, or the installation of traffic signs or new signals.
(B)The installation of wayside technology and onboard technology.
(C)The installation of ramp meters.
(D)The conversion to dedicated transit lanes, including transit queue jump or bypass lanes, shared turning lanes and turn restrictions, the narrowing of lanes to allow for dedicated transit lanes or transit reliability improvements, or the widening of existing transit travel lanes by removing or restricting street parking.
(E)Transit stop access and safety improvements, including, but not limited to, the installation of bus shelters, lighting, transit bulbs and the installation of transit boarding landings and islands.
(12)Transportation demand management program means a specific program of strategies, incentives, and tools to be implemented, including, with specified annual status reporting obligations, to reduce vehicle trips by providing opportunities for the public to choose sustainable travel options, such as transit, bicycle riding, or walking. A specific program of strategies, incentives, and tools includes, but is not limited to, any of the following:
(A)Provision of onsite electric vehicle charging stations in excess of applicable requirements.
(B)Provision of dedicated parking for car share or zero-emission vehicles, or both types of vehicles, in excess of applicable requirements.
(C)Provision of bicycle parking in excess of applicable requirements.
(b)This division does not apply to any of the following projects:
(1)Pedestrian and bicycle facilities that improve safety, access, or mobility, including new facilities, within the public right-of-way.
(2)Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians within the public right-of-way.
(3)Transit prioritization projects.
(4)A project for the designation and conversion of general purpose lanes to high-occupancy vehicle lanes or bus-only lanes, or highway shoulders to part-time transit lanes, for use either during peak congestion hours or all day on highways with existing public transit service or where a public transit agency will be implementing public transit service as identified in a short range transit plan.
(5)(A)A public project for the improvement, institution, or increase of bus rapid transit, microtransit, paratransit, shuttle, bus, ferry, bus rapid transit, or light rail service, including the maintenance, construction, operation, or rehabilitation of stops, stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain buses, shuttles, ferries, or light rail vehicles, on existing public rights-of-way or existing highway rights-of-way, whether or not the right-of-way is in use for public mass transit. vehicles, rail or cable cars, rolling stock, or vessels. The project shall be located on a site that is wholly within the boundaries of an urbanized area or urban cluster, as designated by the United States Census Bureau.
(B)A public project for the construction or rehabilitation of a ferry terminal that a lead agency has submitted a notice of preparation for an environmental impact report pursuant to Section 21092 before January 1, 2026, shall not apply to the exemption pursuant to this paragraph.
(6)A public project for the institution or increase of passenger rail service, other than light rail service eligible under paragraph (5), including the construction or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains. The project shall be located entirely within an existing rail right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for passenger rail transit.
(7)(A)A public project to construct or maintain infrastructure or facilities to charge, refuel, power, or maintain zero-emission public transit buses, trains, or ferries, provided the project is carried out by a public transit agency in compliance with, the State Air Resources Boards Innovative Clean Transit regulations (Article 4.3 (commencing with Section 2023) of Chapter 1 of Division 3 of Title 13 of the California Code of Regulations), the Commercial Harbor Craft regulations (Article 4.3 (commencing with Section 2299.5) of Chapter 5.1 of Division 3 of Title 13 of the California Code of Regulations and Article 4.3 (commencing with Section 93118.5) of Chapter 1 of Division 3 of Title 17 of the California Code of Regulations), the In-Use Locomotive regulations (Article 8 (commencing with Section 2478) of Chapter 9 of Division 3 of Title 13 of the California Code of Regulations), or any regulations identified by the State Air Resources Boards 2020 Mobile Source Strategy, adopted on October 28, 2021, and the project is located on property owned by the local agency or within an existing public right-of-way or on property owned by a public or private utility. 2021.
(B)A lead agency applying an exemption pursuant to this paragraph for hydrogen refueling infrastructure or facilities necessary to refuel or maintain zero-emission public transit buses, trains, or ferries shall comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(8)The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with a project identified in paragraphs (1) to (7), inclusive.
(9)A project that consists exclusively of a combination of any of the components of a project identified in paragraphs (1) to (8), inclusive.
(10)A planning decision carried out by a local agency to reduce or eliminate minimum parking requirements or institute parking maximums, remove or restrict parking, or implement transportation demand management requirements or programs.
(c)Except as provided in subdivision (g), a project exempt from this division under this section shall meet all of the following criteria:
(1)(A)A local agency is carrying out the project and is the lead agency for the project.
(B)The lead agencys governing board agency shall take an action at a public meeting to approve a project subject to subdivision (b). as follows:
(i)The lead agencys governing board shall take an action at a public meeting.
(ii)Notwithstanding clause (i), if a lead agency has an alternative project approval process for a project subject to subdivision (b), it may instead follow that alternative process.
(2)The project does not induce single-occupancy vehicle trips, add additional highway lanes, widen highways, or add physical infrastructure or striping to highways except for minor modifications needed for the efficient and safe movement of transit vehicles, bicycles, or high-occupancy vehicles, such as extended merging lanes, shoulder improvements, or improvements to the roadway within the existing right of way. The project shall not include the addition of any auxiliary lanes.
(3)The construction of the project shall not require the demolition of affordable housing units.
(4)For a project subject to paragraphs (5) to (7), inclusive, of subdivision (b), the project shall be located within existing public right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for rail or public mass transit, or an existing rail right-of-way, whether or not the right-of-way is in use for passenger rail transit, on property owned, leased, or operated by the local agency, or on property owned by a public or private utility.
(d)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed one hundred million dollars ($100,000,000) shall also meet all of the following criteria:
(A)The project is incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review pursuant to this division within 10 years of the approval of the project.
(B)The projects construction impacts are fully mitigated consistent with applicable law.
(C)(i)The lead agency shall complete and consider the results of a project business case and a racial equity analysis. The Office of Planning and Research may set guidelines for the project business case and the racial equity analysis or delegate that authority to metropolitan planning organizations.
(ii)The racial equity analysis required under this subparagraph shall identify the racial equity impacts of the project, identify who will benefit from and be burdened by the project, and, where significant or disproportionate impacts exist, suggest strategies, designs, or actions to mitigate those impacts.
(D)The lead agency shall hold noticed public meetings as follows:
(i)Before determining that a project is exempt pursuant to this section, the lead agency shall hold at least three noticed public meetings in the project area to hear and respond to public comments.
(ii)At least one of the three public meetings shall review the project business case and the racial equity analysis. The review of these documents does not inhibit or preclude application of this section.
(iii)The lead agency shall conduct at least two noticed public meetings annually during project construction for the public to provide comments.
(iv)The public meetings held pursuant to clauses (i) to (iii), inclusive, shall be in the form of either a public community planning meeting held in the project area or in the form of a regularly scheduled meeting of the governing body of the lead agency.
(E)The lead agency shall give public notice of the meetings in subparagraph (D) to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the lead agencys internet website and social media accounts.
(2)In addition to the requirements of paragraph (1), for a project described in that paragraph for which at least 50 percent of the project or projects stops and stations are located in an area that is at risk of residential displacement and that will have a maximum of 15-minute peak headways, the local agency shall complete an analysis of residential displacement and suggest antidisplacement strategies, designs, or actions. For a project subject to this paragraph, the lead agency shall define or identify areas at risk of residential displacement.
(3)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(e)(1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph(1) of subdivision (c), anticipated to exceed fifty million dollars ($50,000,000) shall also comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(2)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(f)(1)(A)Except as provided in subdivision (g), as part of the lead agencys governing board action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), the lead agency shall certify that the project will be completed by a skilled and trained workforce.
(B)Subparagraph (A) does not apply if the lead agency has an existing policy or certification approved by its governing board that requires the use of a skilled and trained workforce to complete the project if the lead agency is a signatory to a project labor agreement that will require the use of a skilled and trained workforce on the project.
(2)(A)Except as provided in subparagraph (B), for a project that is exempted under this section, the lead agency shall not enter into a construction contract with any entity unless the entity provides to the lead agency an enforceable commitment that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or a contract that falls within an apprenticeship occupation in the building and construction trades in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)Subparagraph (A) does not apply if any of the following requirements are met:
(i)The lead agency has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project to use a skilled and trained workforce and the entity has agreed to be bound by that project labor agreement.
(ii)The project or contract is being performed under the extension or renewal of a project labor agreement that was entered into by the lead agency before January 1, 2021.
(iii)The entity contracted to perform the project entered into a project labor agreement that will bind the entity and all its subcontractors at every tier performing the project to use a skilled and trained workforce.
(g)Subdivisions (c) and (f) do not apply to a project described in paragraph (10) of subdivision (b).
(h)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to carry out that project, the lead agency shall file a notice of exemption with the Office of Planning and Research and the county clerk of the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(i)(1)The amendments made to paragraph (5) of subdivision (b) by Chapter 987 of the Statutes of 2022 (Senate Bill 922 of the 202122 Regular Session) may apply to projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023.
(2)For projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023, notwithstanding subdivision (d), as it read on December 31, 2022, the lead agency may certify that the project will be completed by a skilled and trained workforce after the granting of the exemption under this section or the lead agency may demonstrate compliance with subparagraph (B) of paragraph (1) of subdivision (f).
(j)Beginning January 1, 2026, and every two years thereafter, the Office of Land Use and Climate Innovation shall adjust the amounts reflected in paragraph (1) of subdivision (c) and paragraph (1) of subdivision (e) to reflect changes in the California Consumer Price Index, and publish the updated amounts on its internet website.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)(1)(A)This division does not apply to an active transportation plan, a pedestrian plan, or a bicycle transportation plan for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
(B)This division does not apply to a transit comprehensive operational analysis, transit route readjustment, or other transit agency route addition, elimination, or modification.
(2)An active transportation plan or pedestrian plan is encouraged to include the consideration of environmental factors, but that consideration does not inhibit or preclude the application of this section.
(3) An individual project that is a part of an active transportation plan or plan, pedestrian plan plan, or transit comprehensive operational analysis remains subject to this division unless another exemption applies to that project.
(b)Before determining that a project described in subdivision (a) is exempt pursuant to this section, the lead agency shall hold noticed public hearings in areas affected by the project to hear and respond to public comments. Publication of the notice shall be no fewer times than required by Section 6061 of the Government Code by the public agency in a newspaper of general circulation in the area affected by the proposed project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(c)If a local agency determines that a project is not subject to this division pursuant to this section and it determines to approve or carry out that project, the notice shall be filed with the Office of Planning and Research and the county clerk in the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(d)For purposes of this section, the following definitions apply:
(1)Active transportation plan means a plan developed by a local jurisdiction that promotes and encourages people to choose walking, bicycling, or rolling through the creation of safe, comfortable, connected, and accessible walking, bicycling, or rolling networks, and encourages alternatives to single-occupancy vehicle trips.
(2)Pedestrian plan means a plan developed by a local jurisdiction that establishes a comprehensive, coordinated approach to improving pedestrian infrastructure and safety.
(3)Transit comprehensive operational analysis means a plan that redesigns or modifies a transit operators or local agencys public transit service network, including the routing of fixed route and microtransit services.
(e)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.SEC. 2.Section 21080.25 of the Public Resources Code is amended to read:21080.25.(a)For purposes of this section, the following definitions apply:
(1)Affordable housing means any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents or sales prices to levels affordable, as defined in Section 50052.5 or 50053 of the Health and Safety Code, to persons and families of moderate, lower, or very low income, as defined in Section 50079.5, 50093, or 50105 of the Health and Safety Code, respectively.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that had been occupied by tenants within five years from the date of approval of the development agreement by a primary tenant who was low income and did not leave voluntarily.
(2)Bicycle facilities includes, but is not limited to, bicycle parking, bicycle sharing facilities, and bikeways as defined in Section 890.4 of the Streets and Highways Code.
(3)High-occupancy vehicle means a vehicle with three or more occupants.
(4)Highway means a way or place of whatever nature, publicly maintained and open to the use of the public for purposes of vehicular travel. Highway includes a street.
(5)Local agency means a public transit operator, city, county, city and county, special district, joint powers authority, local or regional transportation agency, or congestion management agency.
(6)Part-time transit lanes means designated highway shoulders that support the operation of transit vehicles during specified times and are not open to nonpublic transit vehicles at any time.
(7)Project labor agreement has the same meaning as defined in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(8)Public transit operator has the same meaning as in Section 99210 of the Public Utilities Code.
(9)Skilled and trained workforce has the same meaning as provided in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(10)Transit lanes means street design elements that delineate space within the roadbed as exclusive to transit use, either full or part time.
(11)Transit prioritization projects means any of the following transit project types on highways or in the public right-of-way:
(A)Signal and sign changes, such as signal coordination, signal timing modifications, signal modifications, or the installation of traffic signs or new signals.
(B)The installation of wayside technology and onboard technology.
(C)The installation of ramp meters.
(D)The conversion to dedicated transit lanes, including transit queue jump or bypass lanes, shared turning lanes and turn restrictions, the narrowing of lanes to allow for dedicated transit lanes or transit reliability improvements, or the widening of existing transit travel lanes by removing or restricting street parking.
(E)Transit stop access and safety improvements, including, but not limited to, the installation of bus shelters, lighting, transit bulbs and the installation of transit boarding islands.
(12)Transportation demand management program means a specific program of strategies, incentives, and tools to be implemented, including, with specified annual status reporting obligations, to reduce vehicle trips by providing opportunities for the public to choose sustainable travel options, such as transit, bicycle riding, or walking. A specific program of strategies, incentives, and tools includes, but is not limited to, any of the following:
(A)Provision of onsite electric vehicle charging stations in excess of applicable requirements.
(B)Provision of dedicated parking for car share or zero-emission vehicles, or both types of vehicles, in excess of applicable requirements.
(C)Provision of bicycle parking in excess of applicable requirements.
(b)This division does not apply to any of the following projects:
(1)Pedestrian and bicycle facilities that improve safety, access, or mobility, including new facilities, within the public right-of-way.
(2)Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians within the public right-of-way.
(3)Transit prioritization projects.
(4)A project for the designation and conversion of general purpose lanes to high-occupancy vehicle lanes or bus-only lanes, or highway shoulders to part-time transit lanes, for use either during peak congestion hours or all day on highways with existing public transit service or where a public transit agency will be implementing public transit service as identified in a short range transit plan.
(5)A public project for the institution improvement, institution, or increase of bus rapid transit, shuttle, bus, ferry, or light rail service, including the construction maintenance, construction, or rehabilitation of stops, stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission, near-zero-emission, low oxide of nitrogen engine, compressed natural gas fuel, fuel cell, or hybrid powertrain buses buses, shuttles, ferries, or light rail vehicles, on existing public rights-of-way or existing highway rights-of-way, whether or not the right-of-way is in use for public mass transit. The project shall be located on a site that is wholly within the boundaries of an urbanized area or urban cluster, as designated by the United States Census Bureau.
(6)A public project for the institution or increase of passenger rail service, other than light rail service eligible under paragraph (5), including the construction or rehabilitation of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains. The project shall be located entirely within an existing rail right-of-way or existing highway right-of-way, whether or not the right-of-way is in use for passenger rail transit.
(7)(A)A public project to construct or maintain infrastructure or facilities to charge, refuel, power, or maintain zero-emission public transit buses, trains, or ferries, provided the project is carried out by a public transit agency in compliance with, the State Air Resources Boards Innovative Clean Transit regulations (Article 4.3 (commencing with Section 2023) of Chapter 1 of Division 3 of Title 13 of the California Code of Regulations) Regulations), the Commercial Harbor Craft regulations (Article 4.3 (commencing with Section 2299.5) of Chapter 5.1 of Division 3 of Title 13 of the California Code of Regulations and Article 4.3 (commencing with Section 93118.5) of Chapter 1 of Division 3 of Title 17 of the California Code of Regulations), the In-Use Locomotive regulations (Article 8 (commencing with Section 2478) of Chapter 9 of Division 3 of Title 13 of the California Code of Regulations), or any regulations identified by the State Air Resources Boards 2020 Mobile Source Strategy, adopted on October 28, 2021, and the project is located on property owned by the local agency or within an existing public right-of-way or on property owned by a public or private utility.
(B)A lead agency applying an exemption pursuant to this paragraph for hydrogen refueling infrastructure or facilities necessary to refuel or maintain zero-emission public transit buses, trains, or ferries shall comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(8)The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with a project identified in paragraphs (1) to (7), inclusive.
(9)A project that consists exclusively of a combination of any of the components of a project identified in paragraphs (1) to (8), inclusive.
(10)A planning decision carried out by a local agency to reduce or eliminate minimum parking requirements or institute parking maximums, remove or restrict parking, or implement transportation demand management requirements or programs.
(c)Except as provided in subdivision (g), a project exempt from this division under this section shall meet all of the following criteria:
(1)(A)A local agency is carrying out the project and is the lead agency for the project.
(B)The lead agencys governing board shall take an action at a public meeting to approve a project subject to subdivision (b).
(2)The project does not induce single-occupancy vehicle trips, add additional highway lanes, widen highways, or add physical infrastructure or striping to highways except for minor modifications needed for the efficient and safe movement of transit vehicles, bicycles, or high-occupancy vehicles, such as extended merging lanes, shoulder improvements, or improvements to the roadway within the existing right of way. The project shall not include the addition of any auxiliary lanes.
(3)The construction of the project shall not require the demolition of affordable housing units.
(d)(1)For a project exceeding one hundred million dollars ($100,000,000), a project exempt from this division under this section A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), anticipated to exceed one hundred million dollars ($100,000,000) shall also meet all of the following: following criteria:
(A)The project is incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review pursuant to this division within 10 years of the approval of the project.
(B)The projects construction impacts are fully mitigated consistent with applicable law.
(C)(i)The lead agency shall complete and consider the results of a project business case and a racial equity analysis. The Office of Planning and Research may set guidelines for the project business case and the racial equity analysis or delegate that authority to metropolitan planning organizations.
(ii)The project business case required under this subparagraph shall set forth the rationale for why the project should be implemented to solve a problem or address an opportunity, outline strategic goals and objectives of the project, evaluate other options to achieve the projects objectives, describe the economic costs and benefits of the project, describe the financial implications of the project, and establish what is required to deliver and operate the project.(iii)(ii)The racial equity analysis required under this subparagraph shall identify the racial equity impacts of the project, identify who will benefit from and be burdened by the project, and, where significant or disproportionate impacts exist, suggest strategies, designs, or actions to mitigate those impacts.
(D)The lead agency shall hold noticed public meetings as follows:
(i)Before determining that a project is exempt pursuant to this section, the lead agency shall hold at least three noticed public meetings in the project area to hear and respond to public comments.
(ii)At least one of the three public meetings shall review the project business case and the racial equity analysis. The review of these documents does not inhibit or preclude application of this section.
(iii)The lead agency shall conduct at least two noticed public meetings annually during project construction for the public to provide comments.
(iv)The public meetings held pursuant to clauses (i) to (iii), inclusive, shall be in the form of either a public community planning meeting held in the project area or in the form of a regularly scheduled meeting of the governing body of the lead agency.
(E)The lead agency shall give public notice of the meetings in subparagraph (D) to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the lead agencys internet website and social media accounts.
(2)In addition to the requirements of paragraph (1), for a project described in that paragraph for which at least 50 percent of the project or projects stops and stations are located in an area that is at risk of residential displacement and that will have a maximum of 15-minute peak headways, the local agency shall complete an analysis of residential displacement and suggest antidisplacement strategies, designs, or actions. For a project subject to this paragraph, the lead agency shall define or identify areas at risk of residential displacement.
(3)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(e)For a project exceeding fifty million dollars ($50,000,000), a project exempt from this division under this section (1)A project that is exempt from this division under this section that is, based on the project engineers cost estimate at the time the local agency takes an action pursuant to subparagraph (B) of paragraph(1) of subdivision (c), anticipated to exceed fifty million dollars ($50,000,000) shall also comply with clauses (i), (iii), and (iv) of subparagraph (D) of, and with subparagraph (E) of, paragraph (1) of subdivision (d).
(2)The amount in paragraph (1) shall be adjusted pursuant to subdivision (j).
(f)(1)(A)Except as provided in subdivision (g), in addition to the requirements of as part of the lead agencys governing board action pursuant to subparagraph (B) of paragraph (1) of subdivision (c), following the granting of an exemption under this section, the lead agency shall take an action at a public meeting of its governing board to certify that the project will be completed by a skilled and trained workforce.
(B)Subparagraph (A) does not apply if the lead agency has an existing policy or certification approved by its governing board that requires the use of a skilled and trained workforce to complete the project if the lead agency is a signatory to a project labor agreement that will require the use of a skilled and trained workforce on the project.
(2)(A)Except as provided in subparagraph (B), for a project that is exempted under this section, the lead agency shall not enter into a construction contract with any entity unless the entity provides to the lead agency an enforceable commitment that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or a contract that falls within an apprenticeship occupation in the building and construction trades in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)Subparagraph (A) does not apply if any of the following requirements are met:
(i)The lead agency has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project to use a skilled and trained workforce and the entity has agreed to be bound by that project labor agreement.
(ii)The project or contract is being performed under the extension or renewal of a project labor agreement that was entered into by the lead agency before January 1, 2021.
(iii)The entity contracted to perform the project entered into a project labor agreement that will bind the entity and all its subcontractors at every tier performing the project to use a skilled and trained workforce.
(g)Subdivisions (c) and (f) do not apply to a project described in paragraph (10) of subdivision (b).
(h)If the lead agency determines that a project is not subject to this division pursuant to this section, and the lead agency determines to carry out that project, the lead agency shall file a notice of exemption with the Office of Planning and Research and the county clerk of the county in which the project is located in the manner specified in subdivisions (b) and (c) of Section 21152.
(i)(1)The amendments made to paragraph (5) of subdivision (b) by Chapter 987 of the Statutes of 2022 (Senate Bill 922 of the 202122 Regular Session) may apply to projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023.
(2)For projects for which a lead agency has filed a notice of exemption under this section before January 1, 2023, notwithstanding subdivision (d), as it read on December 31, 2022, the lead agency may certify that the project will be completed by a skilled and trained workforce after the granting of the exemption under this section or the lead agency may demonstrate compliance with subparagraph (B) of paragraph (1) of subdivision (f).
(j)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.(j)Beginning January 1, 2026, and every two years thereafter, the Office of Land Use and Climate Innovation shall adjust the amounts reflected in paragraph (1) of subdivision (c) and paragraph (1) of subdivision (e) to reflect changes in the California Consumer Price Index, and publish the updated amounts on its internet website.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
|
Date
|
Status
|
|---|---|
| Oct 13, 2025 | Chaptered by Secretary of State. Chapter 742, Statutes of 2025. |
| Oct 13, 2025 | Approved by the Governor. |
| Sep 17, 2025 | Enrolled and presented to the Governor at 2 p.m. |
| Sep 10, 2025 | Assembly amendments concurred in. (Ayes 39. Noes 0. Page 2820.) Ordered to engrossing and enrolling. |
| Sep 9, 2025 | In Senate. Concurrence in Assembly amendments pending. |
| Sep 9, 2025 | Read third time. Passed. (Ayes 78. Noes 1. Page 3082.) Ordered to the Senate. |
| Sep 3, 2025 | Read second time. Ordered to third reading. |
| Sep 2, 2025 | Read second time and amended. Ordered to second reading. |
| Aug 29, 2025 | From committee: Do pass as amended. (Ayes 10. Noes 0.) (August 29). |
| Aug 20, 2025 | August 20 set for first hearing. Placed on APPR. suspense file. |
| Jul 17, 2025 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 17, 2025 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 12. Noes 0.) (July 14). |
| Jul 17, 2025 | (Ayes 49. Noes 15. Page 2578.) |
| Jul 17, 2025 | Assembly Rule 63 suspended. |
| Jul 3, 2025 | July 7 hearing postponed by committee. |
| Jun 30, 2025 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on NAT. RES. |
| Jun 9, 2025 | Referred to Com. on NAT. RES. |
| Jun 4, 2025 | In Assembly. Read first time. Held at Desk. |
| Jun 3, 2025 | Read third time. Passed. (Ayes 36. Noes 0. Page 1451.) Ordered to the Assembly. |
| Jun 2, 2025 | Read second time. Ordered to third reading. |
| May 29, 2025 | Ordered to second reading. |
| May 29, 2025 | Read third time and amended. |
| May 27, 2025 | Read second time. Ordered to third reading. |
| May 23, 2025 | Read second time and amended. Ordered to second reading. |
| May 23, 2025 | From committee: Do pass as amended. (Ayes 5. Noes 0. Page 1190.) (May 23). |
| May 16, 2025 | Set for hearing May 23. |
| Apr 28, 2025 | April 28 hearing: Placed on APPR. suspense file. |
| Apr 17, 2025 | Set for hearing April 28. |
| Apr 16, 2025 | April 21 hearing postponed by committee. |
| Apr 10, 2025 | Set for hearing April 21. |
| Apr 9, 2025 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 12. Noes 0. Page 710.) (April 8). Re-referred to Com. on APPR. |
| Mar 28, 2025 | Set for hearing April 8. |
| Mar 25, 2025 | Read second time and amended. Re-referred to Com. on TRANS. |
| Mar 24, 2025 | From committee: Do pass as amended and re-refer to Com. on TRANS. (Ayes 8. Noes 0. Page 421.) (March 19). |
| Mar 13, 2025 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on E.Q. |
| Mar 7, 2025 | Set for hearing March 19. |
| Jan 29, 2025 | Referred to Coms. on E.Q. and TRANS. |
| Jan 15, 2025 | From printer. May be acted upon on or after February 14. |
| Jan 14, 2025 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 10, 2025 | Unfinished Business SB71 Wiener et al. Concurrence | Senate Floor |
Passed |
|
| Sep 9, 2025 | SB 71 Wiener Senate Third Reading By Ward | Assembly Floor |
Passed |
|
| Aug 29, 2025 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jul 14, 2025 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
|
| Jun 3, 2025 | Senate 3rd Reading SB71 Wiener et al. | Senate Floor |
Passed |
|
| May 23, 2025 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 28, 2025 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 8, 2025 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Transportation |
Passed |
|
| Mar 19, 2025 | Do pass as amended, but first amend, and re-refer to the Committee on [Transportation] | Senate Standing Committee on Environmental Quality |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 350 Bay Area Action | ** Support | |
| AARP | ** Support | |
| Accelerate Neighborhood Climate Action | ** Support | |
| Alameda-Contra Costa Transit District | ** Support | |
| Alameda County Transportation Commission | ** Support | |
| All Voting Members of The North Westwood Neighborhood Council | ** Support | |
| American Planning Association, California Chapter | ** Support | |
| Association of California Cities - Orange County | ** Support | |
| Bay Area Council | ** Support | |
| Bike East Bay | ** Support | |
| California Association Of Councils Of Governments | ** Support | |
| California Bicycle Coalition | ** Support | |
| California Business Properties Association | ** Support | |
| California Downtown Association | ** Support | |
| California Electric Transportation Coalition | ** Support | |
| California Hydrogen Business Council | ** Support | |
| California Transit Association | ** Support | |
| City and County of San Francisco | ** Support | |
| City/County Association of Governments of San Mateo County | ** Support | |
| City of Alameda | ** Support | |
| City of Goleta | ** Support | |
| City of San Jose | ** Support | |
| City of Santa Monica | ** Support | |
| Climate Action California | ** Support | |
| East Bay YIMBY | ** Support | |
| Foothill Transit | ** Support | |
| Greenbelt Alliance | ** Support | |
| Grow the Richmond | ** Support | |
| Kidsafe Sf | ** Support | |
| LA Metro | ** Support | |
| Livable California | ** Against | |
| Los Angeles County Metropolitan Transportation Authority | ** Support | |
| Metropolitan Transportation Commission | ** Support | |
| Monterey-Salinas Transit | ** Support | |
| Mountain View YIMBY | ** Support | |
| Move LA | ** Support | |
| Napa-Solano for Everyone | ** Support | |
| Natural Resources Defense Council | ** Support | |
| Northern Neighbors | ** Support | |
| Orange County | ** Support | |
| Orange County Transportation Authority | ** Support | |
| Peninsula Corridor Joint Powers Board | ** Support | |
| Peninsula for Everyone | ** Support | |
| Redlands YIMBY | ** Support | |
| Sacramento Regional Transit District | ** Support | |
| San Diego Association Of Governments | ** Support | |
| San Diego Metropolitan Transit System | ** Support | |
| San Francisco Bay Area Rapid Transit District | ** Support | |
| San Francisco Bay Ferry | ** Support | |
| San Francisco Bicycle Coalition | ** Support | |
| San Francisco Chamber of Commerce | ** Support | |
| San Francisco Municipal Transportation Agency | ** Support | |
| San Mateo County Transit District | ** Support | |
| San Mateo County Transportation Authority | ** Support | |
| Santa Cruz Metropolitan Transit District | ** Support | |
| Santa Cruz Yimby | ** Support | |
| Santa Rosa Yimby | ** Support | |
| Seamless Bay Area | ** Support | |
| Sf Yimby | ** Support | |
| Solano County Transit | ** Support | |
| Sonoma County Transportation Authority/regional Climate Protection Authority | ** Support | |
| South Bay Yimby | ** Support | |
| Southern California Regional Rail Authority | ** Support | |
| SPUR | ** Support | |
| Stanislaus Regional Transit Authority | ** Support | |
| Streets for All | ** Support | |
| Sunline Transit Agency | ** Support | |
| Transform | ** Support | |
| Transportation Agency For Monterey County | ** Support | |
| Valley Industry & Commerce Association | ** Support | |
| Ventura County YIMBY | ** Support | |
| Walk San Francisco Foundation | ** Support | |
| Yimby Action | ** Support | |
| YIMBY LA | ** Support | |
| Yimby SLO | ** Support |
\SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 71 |
UNFINISHED BUSINESS
Bill No: SB 71
Author: Wiener (D), et al.
Amended: 9/2/25
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 8-0, 3/19/25
AYES: Blakespear, Valladares, Dahle, Gonzalez, Hurtado, Menjivar, Padilla, Pérez
SENATE TRANSPORTATION COMMITTEE: 12-0, 4/8/25
AYES: Cortese, Strickland, Archuleta, Arreguín, Blakespear, Cervantes, Dahle, Gonzalez, Grayson, Menjivar, Richardson, Umberg
NO VOTE RECORDED: Limón, Seyarto, Valladares
SENATE APPROPRIATIONS COMMITTEE: 5-0, 5/23/25
AYES: Caballero, Cabaldon, Grayson, Richardson, Wahab
NO VOTE RECORDED: Seyarto, Dahle
SENATE FLOOR: 36-0, 6/3/25
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Laird, McGuire, McNerney, Menjivar, Ochoa Bogh, Padilla, Pérez, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
NO VOTE RECORDED: Jones, Limón, Niello, Reyes
ASSEMBLY FLOOR: 78-1, 9/9/25 - See last page for vote
SUBJECT: California Environmental Quality Act: exemptions: transit projects
SOURCE: Author
DIGEST:
This bill expands and extends existing California Environmental Quality Act (CEQA) exemptions for transit projects, and exempts Diesel-powered heavy rail projects meeting the "Tier 4" exhaust emissions standard if certain criteria are met, among other changes.
Assembly Amendments
of 9/2/25 Add a sunset of January 1, 2040 to the CEQA exemption “clean transportation” projects; removes a one year extension to Environmental Leadership Transit program; specifies that Tier 4 engines are only eligible for this CEQA exemption if they are not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone; specifically exempts projects that combine an exempted clean transportation project with a housing project that is exempt or ministerial.
ANALYSIS:
Existing law:
- Under the California Environmental Quality Act (CEQA), a lead agency determines whether a project is exempt from CEQA, or if it must do an initial study to determine if a project will have significant effects on the environment. If a project has no effect on the environment or effects that can be mitigated, the lead agency prepares a negative declaration (ND) or mitigated ND (MND). If the project will have significant impacts, the lead agency prepares an environmental impact report (EIR) to evaluate and propose mitigation measures for any effects on the environment, including impacts or likely impacts to land, air, water, minerals, flora, fauna, ambient noise, and historic or aesthetic significance. (Public Resources Code (PRC) §§21000 et seq.)
- CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles. (PRC § 21080.20)
- CEQA, until January 1, 2030, exempts certain transportation-related projects, including pedestrian and bicycle facilities, transit prioritization projects, public projects for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements (PRC § 21080.25).
- Requires that these exemptions, not including a project to reduce minimum parking requirements, meet the following criteria:
- Be carried out by a public agency and the public agency is the lead agency.
- Be located in an urbanized area.
- Be located on or within an existing public right-of-way.
- Does not add physical infrastructure that increases new automobile capacity on existing rights-of-way, except as provided.
- Does not require demolition of affordable housing units.
- Has a certification from the lead agency that the project will be completed by a skilled and trained workforce, except as provided.
- Requires that projects using this exemption and that exceed $100 million also meet the following criteria (PRC § 21080.25):
- Be incorporated in a regional transportation plan, sustainable communities’ strategy, general plan, or other plan that has undergone a programmatic-level environmental review within 10 years of the approval of the project.
- Fully mitigate construction impacts consistent with applicable law.
- Require the lead agency to complete and consider results of a project business case and a racial equity analysis, as specified.
- Require lead agency to hold noticed public hearings, as prescribed.
- Requires that projects using this exemption and that exceed $50 million also meet prescribed public notice and hearing requirements (PRC § 21080.25).
- Requires that these exemptions, not including a project to reduce minimum parking requirements, meet the following criteria:
- Establishes the Environmental Leadership Transit Development Program Defines an ELTP as a project to construct a fixed guideway and related fixed facilities that meets all of the following (PRC § 21168.6.9)
This bill:
- Removes the existing 2030 sunset from the exemption for active transportation, pedestrian, and bicycle plans, and adds new, permanent exemptions for transit comprehensive operational analyses and transit route changes.
- Extends the existing 2030 sunset to 2040 for exemptions for "clean" transit projects and adds new exemptions for:
- Microtransit, paratransit, shuttle, and ferry projects. Provides that the application of this exemption to non-zero-emission vehicles, except for articulated buses, expires January 1, 2032.
- Diesel-powered heavy rail projects meeting the "Tier 4" exhaust emissions standard, if the project is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone.
- A project that combines an exempt transit project and a housing development project that is either subject to a nondiscretionary approval or is exempt from CEQA.
- Removes requirements that transit agencies undertaking charging/refueling projects comply with specified ARB rules.
- Adjusts the way in which a project's cost is assessed to determine if it costs more than $50 million or $100 million, which triggers certain requirements including holding public hearings. Specifically, this bill would require that the $50 million and $100 million threshold is based on the project engineer's cost estimate, and require that these cost thresholds should be adjusted to the California Consumer Price Index (CPI).
- Remove specific elements to be contained in the required project business case for projects costing more than $100 million.
Background
- The A, B, C’s of CEQA. CEQA is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment. CEQA is enforced by civil lawsuits that can challenge any project’s environmental review.
Under CEQA, projects (unless they have a specific exemption) must undergo environmental analysis. This process starts with an initial study which determines what level of further environmental review is needed for a given project. If a project has no significant effects on the environment, or if those effects can be fully mitigated, the project can move forward with a negative declaration (ND) or mitigated negative declaration (MND). If the initial study finds that the project has potential significant effects on the environment, then a full EIR is conducted. An EIR provides thorough environmental review of a proposed project, analyzing the significant direct and indirect environmental impacts of a proposed project. The EIR also includes proposed mitigation measures for any significant effects that it identifies and considers alternatives to the proposed project.
- CEQA exemptions. A project is exempt from CEQA if it is ministerial (i.e., it does not involve discretionary decisions), or if there is a specific statutory or categorical exemption that applies to the project. Statutory exemptions are created by the Legislature and typically apply even if a project has the potential to significantly affect the environment. In contrast, categorical exemptions, which are listed in the CEQA guidelines, generally do not apply if there are significant environmental impacts associated with the project, including if (1) there is a reasonable possibility of a significant effect on the environment due to unusual circumstances; (2) significant cumulative impacts from projects of the same type will result; or (3) the project will have impacts on a uniquely sensitive environment.
- Transportation Exemptions in CEQA. The majority of transportation projects are exempt from CEQA. In October 2017, this committee conducted a survey of state agencies regarding CEQA to gain a better understanding of CEQA compliance and litigation. The survey covered a period of five years, Fiscal Years 2011/12 to 2015/16. The Department of Transportation (DOT) reported a total of 3,259 projects during the five-year period, and almost 90% of these projects were exempt from CEQA.
Since this survey was conducted, two Senate bills (SB 288, Wiener Chapter 200, Statutes of 202, and SB 922 Wiener, Chapter 987, Statutes of 2022) further expanded CEQA exemptions for certain clean and active transportation projects. Under the provision of these two bills, and another bill signed into law last year (AB 2503, Lee), the following transportation projects are exempt from CEQA until January 1, 2030:
- Pedestrian and bicycle facilities, including new facilities.
- Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians.
- Transit prioritization projects.
- Projects for the designation and conversion of general purpose lanes or highway shoulders to bus-only lanes.
- A public project for the institution or increase of new bus rapid transit (BRT), bus, or light rail service, including the construction of stations, as specified.
- A public project to construct or increase passenger rail service used for zero-emission trains.
- A public project to construct or maintain infrastructure to charge or refuel zero-emission transit buses, trains, or ferries, as specified.
- The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with one of these projects.
- A project carried out by a city or county to reduce minimum parking requirements.
Many of these exemptions are broad –to provide a backstop to ensure that only active and clean transportation projects are eligible for this CEQA exemption, the exemption also includes a guardrail that specifies projects are not eligible for this CEQA exemption if they induce single-occupancy vehicle trips, add additional highway lanes, or widen highways.
Comments
- Purpose of this bill. According to the author, “Public Transportation is critical to California’s future. Streamlining climate-friendly sustainable transportation projects that improve public transportation and make our streets safer for pedestrians, bicyclists, and other vulnerable road users helps the state better deliver on its climate, housing, and social mobility goals. SB 71 makes a critical CEQA exemption - with environmental and other guardrails - for such projects that was first enacted with great success 5 years ago permanent, while slightly expanding and cleaning up the law. At a time when public transportation systems in California and across the nation face acute funding pressures and federal uncertainty, it is critical to enact this reform so that public transportation agencies and local agencies can continue to control capital costs and deliver projects without delay and associated cost increases from the bad-faith abuse of environmental laws. SB 71 will ensure that projects that help the state meet its climate goals, facilitate dense urban infill development, improve access to opportunity and mobility, and support high-quality construction jobs continue, and deliver on the promise of infrastructure investment.”
- “Environmental” projects can still have environmental impacts. Bike lanes, buses, zero emission trains and other “clean transportation” projects can reduce greenhouse gas and local air pollution emissions if they replace gas-powered vehicles. These types of projects can also improve quality of life in communities by increasing mobility options. However, even projects that have environmental and social benefits can come with environmental impacts. SB 71 includes a large suite of transportation projects, including projects that are likely to have small impacts if any (like adding lighting to bus stops), and projects that are likely to have significant environmental impacts, like infrastructure for hydrogen rail or ferry terminals. Under CEQA, impacts associated with those projects would have to be studied, and mitigated as feasible. Providing a CEQA exemption for these projects means that those impacts may go undisclosed to the communities they are located in, and any harmful impacts would go unmitigated.
- What is the track record for the SB 288/SB 922 exemption? Before removing the sunset on the CEQA exemptions in SB 288/SB 922, it is worth knowing if the exemption (1) has been useful in deploying projects (2) has resulted in environmental costs and/or benefits.
According to CEQAnet, the state’s database of filed CEQA documents, approximately 10 projects have used the PRC 21080.20 exemption, and over 100 projects have filed a notice of exemption for transportation projects under PRC Section 21080.25. In terms of speeding along deployment of clean and active transportation projects, the exemption has been a resounding success.
What have been the environmental effects of these projects? The benefits and impacts of these projects are varied as the projects themselves, and the potential for big impacts may scale with the potential for big benefits. Many of the projects that have applied for exemption, as provided on CEQAnet, include bike lanes, bus stops, pedestrian paths and other relatively small projects that are likely to have few harmful environmental impacts as they improve active transportation and ideally, reduce reliance on gas-powered single-occupancy vehicles that generate air and greenhouse gas emissions. However, the exemption also includes a number of large projects that are likely to have significant impacts on the environment, such as Metro’s Next Gen Bus Plan, which will implement “The design and construction of new bus-only lanes and other transit priority improvements along up to 80 lane miles on the highest frequency corridors in the city of Los Angeles.[1]”Another example of a potentially high-impact project was one in which a building was demolished in order to more easily stage the building of additional bus bays and a metro deboarding platform in San Diego. The notice of exemption for this project noted that the building to be demolished “contains asbestos and lead”. According to minutes of the meeting of the San Diego Metropolitan Transit System Board of Directors where the work order for the project was authorized and which determined that the project was CEQA exempt, the space where the building was demolished was to be “converted to employee parking”. These projects are likely to increase bus and metro ridership, but it is also possible that they could have other, less desirable impacts. As SB 71 extends the sunset for clean transportation projects for the next 14 years (until January 1, 2040), it is worth considering how the Legislature will determine whether the exemption is resulting in unintended consequences.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee: “The Bay Conservation and Development Commission (BCDC) estimates ongoing annual General Fund costs of approximately $191,000 (General Fund) to hire one coastal planning analyst. BCDC notes there is substantial overlap between the natural resource impacts evaluated in a CEQA document (such as an EIR) and the impacts to San Francisco Bay resources BCDC must evaluate as part of its permitting process under the McAteer-Petris Act and the Bay Plan, such as impacts from construction activities on special status species, impacts from development on tidal marsh or subtidal habitat, or impacts to hydrology. Accordingly, BCDC relies on CEQA documentation to identify a project's environmental impacts as well as mitigation measures, which subsequently inform BCDC's permit conditions. By exempting ferry terminal projects from CEQA, BCDC contends it will need to separately evaluate project impacts and environmental studies provided by applicants, which will be resource-intensive. Similarly, the Bay Plan requires BCDC to coordinate and rely on other expert agencies (like the State Water Resources Control Board and the Department of Fish and Wildlife) and incorporate their evaluations of a project into BCDC's analyses. These agencies typically rely on CEQA documentation when making their determinations. Therefore, it is possible other state regulatory agencies may similarly incur costs as a result of this bill.”
“The Office of Land Use and Climate Innovation (LCI) estimates annual General Fund costs of $219,000 for two years to hire one air pollution specialist to develop technical assistance and implementation guidance and respond to inquiries from lead agencies. LCI develops technical advisories on CEQA, including statutes that provide exemptions from CEQA. LCI developed the sustainable transportation technical advisory that provides guidance for Public Resources Code section 21080.25 (which this bill amends) in 2021. Since the development of this advisory, the code has been amended twice, with this bill being the third. LCI contends the limited-term position is needed to update the advisory and provide updated guidance for implementation. While this may be the case, it is not clear to this committee that LCI's cost estimate should be attributed to this bill alone.”
SUPPORT: (Verified 9/9/25)
350 Bay Area Action
AARP
Accelerate Neighborhood Climate Action
All Voting Members of the North Westwood Neighborhood Council
Association of California Cities - Orange County
Bay Area Council
Bike East Bay
California Bicycle Coalition
California Business Properties Association
California Downtown Association
California Electric Transportation Coalition
California Hydrogen Business Council
California Transit Association
City and County of San Francisco
City of Goleta
City of Santa Monica
City/county Association of Governments of San Mateo County
East Bay Yimby
Greenbelt Alliance
Grow the Richmond
Kidsafe Sf
LA Metro
Los Angeles County Metropolitan Transportation Authority
Metropolitan Transportation Commission
Monterey-salinas Transit
Mountain View Yimby
Move LA
Napa-solano for Everyone
Northern Neighbors
Orange County Transportation Authority
Peninsula Corridor Joint Powers Board
Peninsula for Everyone
Redlands Yimby
Sacramento Regional Transit District
San Francisco Bay Ferry
San Francisco Bicycle Coalition
San Francisco Chamber of Commerce
San Francisco Municipal Transportation Agency
San Mateo County Transit District
San Mateo County Transportation Authority
Santa Cruz Yimby
Santa Rosa Yimby
Seamless Bay Area
Sf Yimby
South Bay Yimby
Spur
Stanislaus Regional Transit Authority
Streets for All
Sunline Transit Agency
Ventura County Yimby
Walk San Francisco Foundation
Yimby Action
Yimby LA
Yimby Slo
OPPOSITION: (Verified 9/9/25)
None received
ASSEMBLY FLOOR: 78-1, 9/9/25
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Bonta, Bryan, Calderon, Caloza, Carrillo, Castillo, Chen, Connolly, Davies, DeMaio, Dixon, Elhawary, Ellis, Flora, Fong, Gabriel, Gallagher, Garcia, Gipson, Jeff Gonzalez, Mark González, Hadwick, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Johnson, Kalra, Krell, Lackey, Lee, Lowenthal, Macedo, McKinnor, Nguyen, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Sanchez, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ta, Tangipa, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NOES: Boerner
NO VOTE RECORDED: Muratsuchi
Prepared by: Brynn Cook / E.Q. / (916) 651-4108
7/21/26 13:55:28
**** END ****
\SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 71 |
UNFINISHED BUSINESS
Bill No: SB 71
Author: Wiener (D), et al.
Amended: 9/2/25 in Assembly
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 8-0, 3/19/25
AYES: Blakespear, Valladares, Dahle, Gonzalez, Hurtado, Menjivar, Padilla, Pérez
SENATE TRANSPORTATION COMMITTEE: 12-0, 4/8/25
AYES: Cortese, Strickland, Archuleta, Arreguín, Blakespear, Cervantes, Dahle, Gonzalez, Grayson, Menjivar, Richardson, Umberg
NO VOTE RECORDED: Limón, Seyarto, Valladares
SENATE APPROPRIATIONS COMMITTEE: 5-0, 5/23/25
AYES: Caballero, Cabaldon, Grayson, Richardson, Wahab
NO VOTE RECORDED: Seyarto, Dahle
SENATE FLOOR: 36-0, 6/3/25
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Laird, McGuire, McNerney, Menjivar, Ochoa Bogh, Padilla, Pérez, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
NO VOTE RECORDED: Jones, Limón, Niello, Reyes
ASSEMBLY FLOOR: 56-1, 9/9/25 – Roll call not available
SUBJECT: California Environmental Quality Act: exemptions: transit projects
SOURCE: Author
DIGEST:
This bill expands and extends existing California Environmental Quality Act (CEQA) exemptions for transit projects, and exempts Diesel-powered heavy rail projects meeting the "Tier 4" exhaust emissions standard if certain criteria are met, among other changes.
Assembly Amendments
: Add a sunset of January 1, 2040 to the CEQA exemption “clean transportation” projects; removes a one year extension to Environmental Leadership Transit program; specifies that Tier 4 engines are only eligible for this CEQA exemption if they are not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone; specifically exempts projects that combine an exempted clean transportation project with a housing project that is exempt or ministerial.
ANALYSIS:
Existing law:
- Under the California Environmental Quality Act (CEQA), a lead agency determines whether a project is exempt from CEQA, or if it must do an initial study to determine if a project will have significant effects on the environment. If a project has no effect on the environment or effects that can be mitigated, the lead agency prepares a negative declaration (ND) or mitigated ND (MND). If the project will have significant impacts, the lead agency prepares an environmental impact report (EIR) to evaluate and propose mitigation measures for any effects on the environment, including impacts or likely impacts to land, air, water, minerals, flora, fauna, ambient noise, and historic or aesthetic significance. (Public Resources Code (PRC) §§21000 et seq.)
- CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles. (PRC § 21080.20)
- CEQA, until January 1, 2030, exempts certain transportation-related projects, including pedestrian and bicycle facilities, transit prioritization projects, public projects for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements (PRC § 21080.25).
- Requires that these exemptions, not including a project to reduce minimum parking requirements, meet the following criteria:
- Be carried out by a public agency and the public agency is the lead agency.
- Be located in an urbanized area.
- Be located on or within an existing public right-of-way.
- Does not add physical infrastructure that increases new automobile capacity on existing rights-of-way, except as provided.
- Does not require demolition of affordable housing units.
- Has a certification from the lead agency that the project will be completed by a skilled and trained workforce, except as provided.
- Requires that projects using this exemption and that exceed $100 million also meet the following criteria (PRC § 21080.25):
- Be incorporated in a regional transportation plan, sustainable communities’ strategy, general plan, or other plan that has undergone a programmatic-level environmental review within 10 years of the approval of the project.
- Fully mitigate construction impacts consistent with applicable law.
- Require the lead agency to complete and consider results of a project business case and a racial equity analysis, as specified.
- Require lead agency to hold noticed public hearings, as prescribed.
- Requires that projects using this exemption and that exceed $50 million also meet prescribed public notice and hearing requirements (PRC § 21080.25).
- Requires that these exemptions, not including a project to reduce minimum parking requirements, meet the following criteria:
- Establishes the Environmental Leadership Transit Development Program Defines an ELTP as a project to construct a fixed guideway and related fixed facilities that meets all of the following (PRC § 21168.6.9)
This bill:
- Removes the existing 2030 sunset from the exemption for active transportation, pedestrian, and bicycle plans, and adds new, permanent exemptions for transit comprehensive operational analyses and transit route changes.
- Extends the existing 2030 sunset to 2040 for exemptions for "clean" transit projects and adds new exemptions for:
- Microtransit, paratransit, shuttle, and ferry projects. Provides that the application of this exemption to non-zero-emission vehicles, except for articulated buses, expires January 1, 2032.
- Diesel-powered heavy rail projects meeting the "Tier 4" exhaust emissions standard, if the project is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone.
- A project that combines an exempt transit project and a housing development project that is either subject to a nondiscretionary approval or is exempt from CEQA.
- Removes requirements that transit agencies undertaking charging/refueling projects comply with specified ARB rules.
- Adjusts the way in which a project's cost is assessed to determine if it costs more than $50 million or $100 million, which triggers certain requirements including holding public hearings. Specifically, this bill would require that the $50 million and $100 million threshold is based on the project engineer's cost estimate, and require that these cost thresholds should be adjusted to the California Consumer Price Index (CPI).
- Remove specific elements to be contained in the required project business case for projects costing more than $100 million.
Background
- The A, B, C’s of CEQA. CEQA is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment. CEQA is enforced by civil lawsuits that can challenge any project’s environmental review.
Under CEQA, projects (unless they have a specific exemption) must undergo environmental analysis. This process starts with an initial study which determines what level of further environmental review is needed for a given project. If a project has no significant effects on the environment, or if those effects can be fully mitigated, the project can move forward with a negative declaration (ND) or mitigated negative declaration (MND). If the initial study finds that the project has potential significant effects on the environment, then a full EIR is conducted. An EIR provides thorough environmental review of a proposed project, analyzing the significant direct and indirect environmental impacts of a proposed project. The EIR also includes proposed mitigation measures for any significant effects that it identifies and considers alternatives to the proposed project.
- CEQA exemptions. A project is exempt from CEQA if it is ministerial (i.e., it does not involve discretionary decisions), or if there is a specific statutory or categorical exemption that applies to the project. Statutory exemptions are created by the Legislature and typically apply even if a project has the potential to significantly affect the environment. In contrast, categorical exemptions, which are listed in the CEQA guidelines, generally do not apply if there are significant environmental impacts associated with the project, including if (1) there is a reasonable possibility of a significant effect on the environment due to unusual circumstances; (2) significant cumulative impacts from projects of the same type will result; or (3) the project will have impacts on a uniquely sensitive environment.
- Transportation Exemptions in CEQA. The majority of transportation projects are exempt from CEQA. In October 2017, this committee conducted a survey of state agencies regarding CEQA to gain a better understanding of CEQA compliance and litigation. The survey covered a period of five years, Fiscal Years 2011/12 to 2015/16. The Department of Transportation (DOT) reported a total of 3,259 projects during the five-year period, and almost 90% of these projects were exempt from CEQA.
Since this survey was conducted, two Senate bills (SB 288, Wiener Chapter 200, Statutes of 202, and SB 922 Wiener, Chapter 987, Statutes of 2022) further expanded CEQA exemptions for certain clean and active transportation projects. Under the provision of these two bills, and another bill signed into law last year (AB 2503, Lee), the following transportation projects are exempt from CEQA until January 1, 2030:
- Pedestrian and bicycle facilities, including new facilities.
- Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians.
- Transit prioritization projects.
- Projects for the designation and conversion of general purpose lanes or highway shoulders to bus-only lanes.
- A public project for the institution or increase of new bus rapid transit (BRT), bus, or light rail service, including the construction of stations, as specified.
- A public project to construct or increase passenger rail service used for zero-emission trains.
- A public project to construct or maintain infrastructure to charge or refuel zero-emission transit buses, trains, or ferries, as specified.
- The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with one of these projects.
- A project carried out by a city or county to reduce minimum parking requirements.
Many of these exemptions are broad –to provide a backstop to ensure that only active and clean transportation projects are eligible for this CEQA exemption, the exemption also includes a guardrail that specifies projects are not eligible for this CEQA exemption if they induce single-occupancy vehicle trips, add additional highway lanes, or widen highways.
Comments
- Purpose of this bill. According to the author, “Public Transportation is critical to California’s future. Streamlining climate-friendly sustainable transportation projects that improve public transportation and make our streets safer for pedestrians, bicyclists, and other vulnerable road users helps the state better deliver on its climate, housing, and social mobility goals. SB 71 makes a critical CEQA exemption - with environmental and other guardrails - for such projects that was first enacted with great success 5 years ago permanent, while slightly expanding and cleaning up the law. At a time when public transportation systems in California and across the nation face acute funding pressures and federal uncertainty, it is critical to enact this reform so that public transportation agencies and local agencies can continue to control capital costs and deliver projects without delay and associated cost increases from the bad-faith abuse of environmental laws. SB 71 will ensure that projects that help the state meet its climate goals, facilitate dense urban infill development, improve access to opportunity and mobility, and support high-quality construction jobs continue, and deliver on the promise of infrastructure investment.”
- “Environmental” projects can still have environmental impacts. Bike lanes, buses, zero emission trains and other “clean transportation” projects can reduce greenhouse gas and local air pollution emissions if they replace gas-powered vehicles. These types of projects can also improve quality of life in communities by increasing mobility options. However, even projects that have environmental and social benefits can come with environmental impacts. SB 71 includes a large suite of transportation projects, including projects that are likely to have small impacts if any (like adding lighting to bus stops), and projects that are likely to have significant environmental impacts, like infrastructure for hydrogen rail or ferry terminals. Under CEQA, impacts associated with those projects would have to be studied, and mitigated as feasible. Providing a CEQA exemption for these projects means that those impacts may go undisclosed to the communities they are located in, and any harmful impacts would go unmitigated.
- What is the track record for the SB 288/SB 922 exemption? Before removing the sunset on the CEQA exemptions in SB 288/SB 922, it is worth knowing if the exemption (1) has been useful in deploying projects (2) has resulted in environmental costs and/or benefits.
According to CEQAnet, the state’s database of filed CEQA documents, approximately 10 projects have used the PRC 21080.20 exemption, and over 100 projects have filed a notice of exemption for transportation projects under PRC Section 21080.25. In terms of speeding along deployment of clean and active transportation projects, the exemption has been a resounding success.
What have been the environmental effects of these projects? The benefits and impacts of these projects are varied as the projects themselves, and the potential for big impacts may scale with the potential for big benefits. Many of the projects that have applied for exemption, as provided on CEQAnet, include bike lanes, bus stops, pedestrian paths and other relatively small projects that are likely to have few harmful environmental impacts as they improve active transportation and ideally, reduce reliance on gas-powered single-occupancy vehicles that generate air and greenhouse gas emissions. However, the exemption also includes a number of large projects that are likely to have significant impacts on the environment, such as Metro’s Next Gen Bus Plan, which will implement “The design and construction of new bus-only lanes and other transit priority improvements along up to 80 lane miles on the highest frequency corridors in the city of Los Angeles.[1]”Another example of a potentially high-impact project was one in which a building was demolished in order to more easily stage the building of additional bus bays and a metro deboarding platform in San Diego. The notice of exemption for this project noted that the building to be demolished “contains asbestos and lead”. According to minutes of the meeting of the San Diego Metropolitan Transit System Board of Directors where the work order for the project was authorized and which determined that the project was CEQA exempt, the space where the building was demolished was to be “converted to employee parking”. These projects are likely to increase bus and metro ridership, but it is also possible that they could have other, less desirable impacts. As SB 71 extends the sunset for clean transportation projects for the next 14 years (until January 1, 2040), it is worth considering how the Legislature will determine whether the exemption is resulting in unintended consequences.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee: “The Bay Conservation and Development Commission (BCDC) estimates ongoing annual General Fund costs of approximately $191,000 (General Fund) to hire one coastal planning analyst. BCDC notes there is substantial overlap between the natural resource impacts evaluated in a CEQA document (such as an EIR) and the impacts to San Francisco Bay resources BCDC must evaluate as part of its permitting process under the McAteer-Petris Act and the Bay Plan, such as impacts from construction activities on special status species, impacts from development on tidal marsh or subtidal habitat, or impacts to hydrology. Accordingly, BCDC relies on CEQA documentation to identify a project's environmental impacts as well as mitigation measures, which subsequently inform BCDC's permit conditions. By exempting ferry terminal projects from CEQA, BCDC contends it will need to separately evaluate project impacts and environmental studies provided by applicants, which will be resource-intensive. Similarly, the Bay Plan requires BCDC to coordinate and rely on other expert agencies (like the State Water Resources Control Board and the Department of Fish and Wildlife) and incorporate their evaluations of a project into BCDC's analyses. These agencies typically rely on CEQA documentation when making their determinations. Therefore, it is possible other state regulatory agencies may similarly incur costs as a result of this bill.”
“The Office of Land Use and Climate Innovation (LCI) estimates annual General Fund costs of $219,000 for two years to hire one air pollution specialist to develop technical assistance and implementation guidance and respond to inquiries from lead agencies. LCI develops technical advisories on CEQA, including statutes that provide exemptions from CEQA. LCI developed the sustainable transportation technical advisory that provides guidance for Public Resources Code section 21080.25 (which this bill amends) in 2021. Since the development of this advisory, the code has been amended twice, with this bill being the third. LCI contends the limited-term position is needed to update the advisory and provide updated guidance for implementation. While this may be the case, it is not clear to this committee that LCI's cost estimate should be attributed to this bill alone.”
SUPPORT: (Verified 9/9/25)
350 Bay Area Action
AARP
Accelerate Neighborhood Climate Action
All Voting Members of the North Westwood Neighborhood Council
Association of California Cities - Orange County
Bay Area Council
Bike East Bay
California Bicycle Coalition
California Business Properties Association
California Downtown Association
California Electric Transportation Coalition
California Hydrogen Business Council
California Transit Association
City and County of San Francisco
City of Goleta
City of Santa Monica
City/county Association of Governments of San Mateo County
East Bay Yimby
Greenbelt Alliance
Grow the Richmond
Kidsafe Sf
LA Metro
Los Angeles County Metropolitan Transportation Authority
Metropolitan Transportation Commission
Monterey-salinas Transit
Mountain View Yimby
Move LA
Napa-solano for Everyone
Northern Neighbors
Orange County Transportation Authority
Peninsula Corridor Joint Powers Board
Peninsula for Everyone
Redlands Yimby
Sacramento Regional Transit District
San Francisco Bay Ferry
San Francisco Bicycle Coalition
San Francisco Chamber of Commerce
San Francisco Municipal Transportation Agency
San Mateo County Transit District
San Mateo County Transportation Authority
Santa Cruz Yimby
Santa Rosa Yimby
Seamless Bay Area
Sf Yimby
South Bay Yimby
Spur
Stanislaus Regional Transit Authority
Streets for All
Sunline Transit Agency
Ventura County Yimby
Walk San Francisco Foundation
Yimby Action
Yimby LA
Yimby Slo
OPPOSITION: (Verified 9/9/25)
None received
Prepared by: Brynn Cook / E.Q. / (916) 651-4108
9/9/25 15:05:53
**** END ****
SENATE THIRD READING
STR Bill Id:SB 71
Author:(Wiener)
As Amended Ver:September 02, 2025
Majority vote
SUMMARY
Expands and extends existing California Environmental Quality Act (CEQA) exemptions for transit projects, including adding new exemptions for diesel train projects and combined transit-housing projects, and extending the existing 2030 sunset until 2040.
Major Provisions
- Removes the existing 2030 sunset from the exemption for active transportation, pedestrian, and bicycle plans, and adds new, permanent exemptions for transit comprehensive operational analyses and transit route changes.
- Extends the existing 2030 sunset to 2040 for exemptions for "clean" transit projects and adds new exemptions for:
- Microtransit, paratransit, shuttle, and ferry projects. Provides that the application of this exemption to non-zero-emission vehicles, except for articulated buses, expires January 1, 2032.
- Diesel-powered heavy rail projects meeting the "Tier 4" exhaust emissions standard, if the project is not located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone.
- A project that combines an exempt transit project and a housing development project that is either subject to a nondiscretionary approval or is exempt from CEQA.
- Removes requirements that transit agencies undertaking charging/refueling projects comply with specified ARB rules.
- Adjusts the way in which a project's cost is assessed to determine if it costs more than $50 million or $100 million, which triggers certain requirements including holding public hearings. Specifically, this bill would require that the $50 million and $100 million threshold is based on the project engineer's cost estimate, and require that these cost thresholds should be adjusted to the California Consumer Price Index (CPI).
- Remove specific elements to be contained in the required project business case for projects costing more than $100 million.
COMMENTS
CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
CEQA actions taken by public agencies can be challenged in superior court once the agency approves or determines to carry out the project. CEQA appeals are subject to unusually short statutes of limitations. Generally, a petition must be filed within 30 to 35 days, depending on the type of decision. The courts are required to give CEQA actions preference over all other civil actions. The petitioner must request a hearing within 90 days of filing the petition and, generally, briefing must be completed within 90 days of the request for hearing.
CEQA includes statutory exemptions for certain transportation project types (listed above). In addition, the CEQA Guidelines include categorical exemptions that apply to some transportation projects, including: (1) work on existing facilities where there is negligible expansion of an existing use, specifically including "(e)xisting highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities" (CEQA Guidelines Section 15301(c)); and (2) minor public or private alterations in the condition of land, water, and/or vegetation which do not involve removal of healthy, mature, scenic trees, except for forestry or agricultural purposes, specifically including the creation of bicycle lanes on existing rights-of-way (CEQA Guidelines Section 15304 (h)).
According to the Author
Public transportation is critical to California's future. Streamlining climate-friendly sustainable transportation projects that improve public transportation and make our streets safer for pedestrians, bicyclists, and other vulnerable road users helps the state better deliver on its climate, housing, and social mobility goals. SB 71 makes a critical CEQA exemption - with environmental and other guardrails - for such projects that was first enacted with great success 5 years ago permanent, while slightly expanding and cleaning up the law. At a time where public transportation systems in California and across the nation face acute funding pressures and federal uncertainty, it is critical to enact this reform so that public transportation agencies and local agencies can continue to control capital costs and deliver projects without delay and associated cost increases from the bad-faith abuse of environmental laws. SB 71 will ensure that projects that help the state meet its climate goals, facilitate dense urban infill development, improve access to opportunity and mobility, and support high-quality construction jobs continue, and deliver on the promise of infrastructure investment.
Arguments in Support
According to the California Transit Association and other transit project advocates, since the passage of SB 288 in 2020, over 90 projects have moved forward more quickly and cost effectively, including transit priority projects, bicycle & pedestrian projects, bus rapid transit projects, traffic calming projects, zero-emission vehicle charging infrastructure, ADA curb and sidewalk repairs, and transit maintenance facility modernization. As such, we believe the state should make many of these exemptions permanent, while giving others additional time to use the provisions of the bill. This would create long-term certainty for local agencies as they continue to advance projects that further clean transportation options and make public transit more equitable and accessible.
Arguments in Opposition
None received on current version of the bill.
FISCAL COMMENTS
According to the Assembly Appropriations Committee:
- The Bay Conservation and Development Commission (BCDC) estimates ongoing annual General Fund costs of approximately $191,000 (General Fund) to hire one coastal planning analyst. BCDC notes there is substantial overlap between the natural resource impacts evaluated in a CEQA document (such as an EIR) and the impacts to San Francisco Bay resources BCDC must evaluate as part of its permitting process under the McAteer-Petris Act and the Bay Plan, such as impacts from construction activities on special status species, impacts from development on tidal marsh or subtidal habitat, or impacts to hydrology. Accordingly, BCDC relies on CEQA documentation to identify a project's environmental impacts as well as mitigation measures, which subsequently inform BCDC's permit conditions. By exempting ferry terminal projects from CEQA, BCDC contends it will need to separately evaluate project impacts and environmental studies provided by applicants, which will be resource-intensive. Similarly, the Bay Plan requires BCDC to coordinate and rely on other expert agencies (like the State Water Resources Control Board and the Department of Fish and Wildlife) and incorporate their evaluations of a project into BCDC's analyses. These agencies typically rely on CEQA documentation when making their determinations. Therefore, it is possible other state regulatory agencies may similarly incur costs as a result of this bill.
- The Office of Land Use and Climate Innovation (LCI) estimates annual General Fund costs of $219,000 for two years to hire one air pollution specialist to develop technical assistance and implementation guidance and respond to inquiries from lead agencies. LCI develops technical advisories on CEQA, including statutes that provide exemptions from CEQA. LCI developed the sustainable transportation technical advisory that provides guidance for Public Resources Code section 21080.25 (which this bill amends) in 2021. Since the development of this advisory, the code has been amended twice, with this bill being the third. LCI contends the limited-term position is needed to update the advisory and provide updated guidance for implementation. While this may be the case, it is not clear to this committee that LCI's cost estimate should be attributed to this bill alone.
VOTES
SENATE FLOOR: 36-0-4
YES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Laird, McGuire, McNerney, Menjivar, Ochoa Bogh, Padilla, Pérez, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
ABS, ABST OR NV: Jones, Limón, Niello, Reyes
ASM NATURAL RESOURCES: 12-0-2
YES: Bryan, Alanis, Connolly, Ellis, Flora, Garcia, Haney, Hoover, Kalra, Pellerin, Schultz, Zbur
ABS, ABST OR NV: Muratsuchi, Wicks
ASM APPROPRIATIONS: 10-0-5
YES: Wicks, Arambula, Calderon, Caloza, Elhawary, Fong, Ahrens, Pacheco, Pellerin, Solache
ABS, ABST OR NV: Sanchez, Dixon, Mark González, Ta, Tangipa
UPDATED
VERSION: September 02, 2025
CONSULTANT: Lawrence Lingbloom / NAT. RES. / (916) 319-2092 FN: 0001509
Date of Hearing: August 20, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 71
Author:(Wiener) – As Amended Ver:July 17, 2025
Policy Committee: | Natural Resources | Vote: | 12 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill extends and expands California Environmental Quality Act (CEQA) exemptions for certain transportation-related projects.
Specifically, this bill, among other things:
- Removes the 2030 sunset for the existing CEQA exemption for active transportation, pedestrian, and bicycle plans, and adds new, permanent exemptions for transit comprehensive operational analyses and transit route changes.
- Extends the sunset, from January 1, 2030, to January 1, 2040, for existing CEQA exemptions for specified transportation-related projects and adds new exemptions for, among other things, and except as specified:
- Micro-transit, paratransit, shuttle, and ferry projects. Provides that a project may not use this exemption after January 1, 2032, if the project primarily uses near-zero-emission, low oxides of nitrogen engine, compressed natural gas, or hybrid powertrain vehicles, except for articulated buses.
- Public projects for the improvement of passenger rail service, including the maintenance of stations, terminals, or existing operations facilities, which will be exclusively used by zero-emission trains or certified Tier 4 or cleaner rolling stock or locomotives. Excludes from this exemption a public project that uses non-zero-emission rolling stock or locomotives and that is located in an air basin designated as a serious, severe, or extreme nonattainment area for particulate matter and ozone.
- Removes the requirement for transit agencies undertaking certain charging or refueling projects to comply with specified Air Resources Board (ARB) rules, such as ARB’s Innovative Clean Transit regulations.
- Requires, except as provided, the lead agency to take an action at a public meeting in order for the exemption in item 2, above, to apply to a project.
- Adjusts the way in which a project’s cost is assessed to determine if it costs more than $50 million or $100 million, which triggers certain requirements, including holding public hearings. Specifically, this bill requires that the $50 million and $100 million thresholds be based on the project engineer’s cost estimate. Requires, beginning January 1, 2026, and every two years thereafter, the Office of Land Use and Climate Innovation (LCI) to adjust these dollar amounts to reflect changes in the Consumer Price Index, as specified.
- Eliminates the January 1, 2026, sunset on an existing CEQA exemption for environmental leadership transit projects (ELTPs), and provides that the exemption applies, except as specified, only to a project in either of these circumstances: (a) the project is initially approved by the lead agency on or before January 1, 2027, or (b) the draft environmental impact report (EIR) for the project is initially circulated before January 1, 2025.
- Requires resolution, to the extent feasible, of an action or proceeding challenging an action or approval of a public agency, in furtherance of an ELTP, on the grounds of noncompliance with any law, within 365 days of the filing of the certified record of proceedings for the challenged action or approval. Requires Judicial Council, by July 1, 2026, to adopt rules of court to implement this requirement, as specified.
FISCAL EFFECT:
1) The Bay Conservation and Development Commission (BCDC) estimates ongoing annual General Fund costs of approximately $191,000 (General Fund) to hire one coastal planning analyst. BCDC notes there is substantial overlap between the natural resource impacts evaluated in a CEQA document (such as an EIR) and the impacts to San Francisco Bay resources BCDC must evaluate as part of its permitting process under the McAteer-Petris Act and the Bay Plan, such as impacts from construction activities on special status species, impacts from development on tidal marsh or subtidal habitat, or impacts to hydrology. Accordingly, BCDC relies on CEQA documentation to identify a project’s environmental impacts as well as mitigation measures, which subsequently inform BCDC’s permit conditions. By exempting ferry terminal projects from CEQA, BCDC contends it will need to separately evaluate project impacts and environmental studies provided by applicants, which will be resource-intensive.
Similarly, the Bay Plan requires BCDC to coordinate and rely on other expert agencies (like the State Water Resources Control Board and the Department of Fish and Wildlife) and incorporate their evaluations of a project into BCDC’s analyses. These agencies typically rely on CEQA documentation when making their determinations. Therefore, it is possible other state regulatory agencies may similarly incur costs as a result of this bill.
2) LCI estimates annual General Fund costs of $219,000 for two years to hire one air pollution specialist to develop technical assistance and implementation guidance and respond to inquiries from lead agencies. LCI develops technical advisories on CEQA, including statutes that provide exemptions from CEQA. LCI developed the sustainable transportation technical advisory that provides guidance for Public Resources Code section 21080.25 (which this bill amends) in 2021. Since the development of this advisory, the code has been amended twice, with this bill being the third. LCI contends the limited-term position is needed to update the advisory and provide updated guidance for implementation. While this may be the case, it is not clear to this committee that LCI’s cost estimate should be attributed to this bill alone.
3) Potential cost pressure (Trial Court Trust Fund, General Fund) of an unknown amount to the courts to process and hear challenges on an expedited timeline. Expedited cases generally create costs and staffing pressures on the courts, as each review typically requires a judicial officer, research attorneys, and staff. However, the ELTP CEQA exemption statute requires the project applicant to pay any additional costs incurred by the courts to hear and decide any case challenging a lead agency’s action on an ELTP. The Judicial Council’s rules of court (specifically rule 3.2240) requires the project applicant, within 10 days after service of the petition or complaint in a case concerning an ELTP, to pay a fee of $180,000 to the court.
COMMENTS:
1) Purpose. According to the author:
Public transportation is critical to California’s future. Streamlining climate-friendly sustainable transportation projects that improve public transportation and make our streets safer for pedestrians, bicyclists, and other vulnerable road users helps the state better deliver on its climate, housing, and social mobility goals. SB 71 makes a critical CEQA exemption - with environmental and other guardrails - for such projects that was first enacted with great success 5 years ago permanent, while slightly expanding and cleaning up the law.
2) Background. CEQA generally requires state and local government agencies to inform decisionmakers and the public about the potential environmental impacts of proposed projects, and to reduce those impacts to the extent feasible.
This bill makes clarifying changes and expands existing statutory exemptions for CEQA for certain transportation-related projects, primarily established by SB 288 (Wiener), Chapter 200, Statutes of 2020, and further extended and expanded by SB 922 (Wiener), Chapter 987, Statutes of 2022, and AB 2503 (Lee), Chapter 718, Statutes of 2024. According to supporters of this bill, since the passage of SB 288, more than 90 projects have proceeded more quickly and cost-effectively, including transit priority projects, bicycle and pedestrian projects, bus rapid transit projects, zero-emission vehicle charging infrastructure, and others.
The Orange County Transportation Authority (OCTA) notes it has already utilized the existing exemption for a local active transportation project, but that despite the benefits of streamlining, “the existing statute is currently silent on how the existing cost thresholds are to account for inflation or cost increases after the planning phases of projects, creating some uncertainty for projects wishing to use this authority.” OCTA writes: “With SB 71, there would be clarity that the project threshold refers to the project engineer’s cost estimate at the time the local agency takes action to approve the project and will account for inflation.”
Analysis Prepared by: Nikita Koraddi / APPR. / (916) 319-2081
Date of Hearing: July 14, 2025
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Isaac G. Bryan, Chair
SBPCA Bill Id:SB 71
Author:(Wiener) – As Amended Ver:June 30, 2025
SENATE VOTE: 36-0
SUBJECT: California Environmental Quality Act: exemptions: environmental leadership transit projects
SUMMARY: Expands and extends existing California Environmental Quality Act (CEQA) exemptions for transit projects, including removing the existing 2030 sunset for most project types and adding a new exemption for diesel train projects until 2040.
EXISTING LAW:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA. (Public Resources Code (PRC) 21000 et seq.)
- CEQA exempts specified transportation project types, including the following:
- A project for the institution or increase of passenger or commuter service on rail or highway rights-of-way already in use, including modernization of existing stations and parking facilities. (PRC 21080(b)(10))
- A project for the institution or increase of passenger or commuter service on high-occupancy vehicle lanes already in use, including the modernization of existing stations and parking facilities. (PRC 21080(b)(11))
- Facility extensions not to exceed four miles in length which are required for the transfer of passengers from or to exclusive public mass transit guideway or busway public transit services. (PRC 21080(b)(12))
- CEQA exempts, until January 1, 2030, active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles. (PRC 21080.20)
- CEQA exempts, until January 1, 2030, several “clean” public transit project types, including:
- A project for the institution or increase of new bus rapid transit, bus, or light rail service, including the rehabilitation of stations, terminals, or existing operations facilities.
- A project for the institution or increase of zero-emission passenger rail service within an existing rail or highway right-of-way.
- A project to construct or maintain infrastructure to charge or refuel zero-emission transit buses, trains, and ferries.
(PRC 21080.25)
- PRC 21080.25 requires exempt projects meet all of the following criteria:
- A public agency is carrying out the project and is the lead agency for the project.
- The project is located on or within an existing public right-of-way.
- The project does not add physical infrastructure that increases new automobile capacity on existing rights-of-way except for minor modifications needed for the efficient and safe movement of transit vehicles, such as extended merging lanes.
- The construction of the project does not require the demolition of affordable housing units, including rent-controlled units and units occupied by low-income tenants.
- PRC 21080.25 requires a project exceeding $100 million to also meet all of the following criteria:
- The project is incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review within 10 years of the approval of the project.
- Construction impacts are fully mitigated.
- The lead agency completes and considers the results of a project business case, a racial equity analysis, and an analysis of residential displacement.
- The lead agency holds specified public meetings.
- PRC 21080.25 requires the lead agency to certify that the project will be completed by a skilled and trained workforce, as specified.
- CEQA provides for expedited judicial review for up to seven Environmental Leadership Transit Projects (ELTP) to construct a fixed guideway and related fixed facilities that meet all of the following:
- The fixed guideway operates at zero emissions.
- The project meets certain greenhouse gas emission reduction requirements, depending on the length of the project, without using offsets, as specified.
- The project reduces no less than 30,000 vehicle miles traveled in the corridor of the project, as specified.
- The project is consistent with the applicable regional transportation plan and sustainable communities strategy or alternative planning strategy.
- The project applicant demonstrates how the applicant has incorporated sustainable infrastructure practices to achieve sustainability, resiliency, and climate change mitigation and adaptation goals in the project.
- The project is located wholly within the County of Los Angeles or connects to an existing project wholly located in the County of Los Angeles.
- The project is approved by the lead agency on or before January 1, 2025.
- Requires Judicial Council, on or before January 1, 2023, to adopt rules of court that would apply to an action or proceeding brought to attack, review, set aside, void, or annul the certification of an EIR for an ELTP, as defined by this bill, or the granting of any project approvals, requiring lawsuits and any appeals to be resolved, to the extent feasible, within 365 calendar days of filing the certified record of proceedings.
(PRC 21168.6.9)
THIS BILL:
- Removes the existing 2030 sunset from the exemption for active transportation, pedestrian, and bicycle plans, and adds new, permanent exemptions for transit comprehensive operational analyses and transit route changes.
- Removes the existing 2030 sunset from the PRC 21080.25 exemptions for “clean” transit projects and adds new exemptions for:
- Microtransit, paratransit, shuttle, and ferry projects. Provides that the application of this exemption to non-zero-emission vehicles, except for articulated buses, expires January 1, 2032.
- Diesel-powered heavy rail projects meeting the “Tier 4” exhaust emissions standard, until January 1, 2040.
- Expands the footprint of these exemptions from existing rights of way to include projects on any public or private utility property.
- Removes requirements that transit agencies undertaking charging/refueling projects comply with specified ARB rules.
- Adjusts the way in which a project’s cost is assessed to determine if it costs more than $50 million or $100 million, which triggers certain requirements including holding public hearings. Specifically, this bill would require that the $50 million and $100 million threshold is based on the project engineer’s cost estimate, and require that these cost thresholds should be adjusted to the California Consumer Price Index (CPI).
- Remove specific elements to be contained in the required project business case for projects costing more than $100 million.
- Extends the deadline for ELTPs from lead agency approval by January 1, 2025 to either lead agency approval by January 1, 2027 or circulation of the draft EIR before January 1, 2025, and eliminates the January 1, 2026 sunset.
FISCAL EFFECT: According to the Senate Appropriations Committee, one-time costs likely around $100,000 - $150,000 and ongoing costs likely in the tens of thousands of dollars annually (General Fund) for the Governor’s Office of Land Use and Climate Innovation (LCI) to perform and support anticipated rulemaking as well as update existing technical assistance.
COMMENTS:
- Background. CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
CEQA actions taken by public agencies can be challenged in superior court once the agency approves or determines to carry out the project. CEQA appeals are subject to unusually short statutes of limitations. Generally, a petition must be filed within 30 to 35 days, depending on the type of decision. The courts are required to give CEQA actions preference over all other civil actions. The petitioner must request a hearing within 90 days of filing the petition and, generally, briefing must be completed within 90 days of the request for hearing.
CEQA includes statutory exemptions for certain transportation project types (listed above). In addition, the CEQA Guidelines include categorical exemptions that apply to some transportation projects, including: (1) work on existing facilities where there is negligible expansion of an existing use, specifically including "(e)xisting highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities" (CEQA Guidelines Section 15301(c)); and (2) minor public or private alterations in the condition of land, water, and/or vegetation which do not involve removal of healthy, mature, scenic trees, except for forestry or agricultural purposes, specifically including the creation of bicycle lanes on existing rights-of-way (CEQA Guidelines Section 15304 (h)).
- Author’s statement:
Public transportation is critical to California’s future. Streamlining climate-friendly sustainable transportation projects that improve public transportation and make our streets safer for pedestrians, bicyclists, and other vulnerable road users helps the state better deliver on its climate, housing, and social mobility goals. SB 71 makes a critical CEQA exemption - with environmental and other guardrails - for such projects that was first enacted with great success 5 years ago permanent, while slightly expanding and cleaning up the law. At a time where public transportation systems in California and across the nation face acute funding pressures and federal uncertainty, it is critical to enact this reform so that public transportation agencies and local agencies can continue to control capital costs and deliver projects without delay and associated cost increases from the bad-faith abuse of environmental laws. SB 71 will ensure that projects that help the state meet its climate goals, facilitate dense urban infill development, improve access to opportunity and mobility, and support high-quality construction jobs continue, and deliver on the promise of infrastructure investment.
- An exemption for diesel train projects until 2040 is a departure from the clean, sustainable transportation focus of this and the prior bills. Last year, AB 2503 (Lee) added an exemption for passenger heavy rail service projects to the existing “clean” transit exemptions established by SB 288 (Wiener) in 2020, and extended and expanded by SB 922 (Wiener) in 2022. At the time, the argument for AB 2503 was that an exemption was needed to expedite conversion of existing rail lines to catenary (electrified) service. AB 2503 required rail projects to be exclusively zero-emission and located entirely within existing rail or highway right of way, and, along with the rest of the exemptions in PRC 21080.25, sunset January 1, 2030.
This bill expands the AB 2503 exemption to add diesel-powered passenger rail projects, using “Tier 4” or cleaner engines, until January 1, 2040. The bill also expands the eligible locations for these and other transit line projects, permitting projects on any public or private utility property, rather than limiting to existing rail and highway right of way.
Tier 4 is a federal exhaust emissions standard for diesel engines, including locomotives, that currently reflects the lowest emission diesel combustion engines in commercial use. The Tier 4 standard was adopted by USEPA in 2004 and phased in to apply to locomotives manufactured in 2015 and later. Tier 4 emissions standards are met using a combination of particulate filters, catalysts, and ultra-low sulfur diesel fuel. Going forward, a new diesel passenger rail project is likely to use Tier 4 engines, rather than older, higher-emitting locomotives. Today, Tier 4 is not a new standard or a stretch target. By 2040, Tier 4 is likely to be very outdated.
Diesel exhaust is a carcinogen and a significant contributor of particulate matter in areas of the state designated as serious, severe, and extreme nonattainment, including the South Coast air basin and the San Joaquin Valley. While diesel passenger train service can achieve net emissions benefits compared to other modes of transportation, diesel emissions have significant impacts on communities adjacent to the tracks, particularly near stations or where trains slow or idle. This bill would assure that the impacts of diesel emissions from operation of new passenger rail projects would not be analyzed or mitigated. The author and the committee may wish to consider removing or limiting this broad new exemption for diesel train projects.
- Expansion to property owned by a public or private utility brings in a wide range of lands that are not compatible with transit projects. For several project types, including bus, light rail and passenger heavy rail, this bill expands the current limit to existing rights of way to include any property owned by a public or private utility. Electric and water utilities are among the largest landowners in the state, with reservoirs, hydroelectric projects, adjacent watershed lands, forests, and campgrounds. None of these seem to be appropriate sites for CEQA-exempt transit projects. The author and the committee may wish to consider limiting the transit line projects to existing rights of way and limiting use of utility property for transit charging/refueling projects to urban areas.
- Out of left field. Senate Floor amendments added Section 3 to this bill, which extends approval deadlines for environmental leadership transit projects in Los Angeles County. A beneficiary of this extension is the Dodgers Stadium Gondola project, which would transport passengers 1.2 miles between Union Station and Dodgers Stadium. Though the project was certified and approved by the lead agency prior to the existing deadlines, it has been delayed due to local opposition and litigation.
Two nonprofits sued the lead agency (LA Metro) under CEQA, arguing that the EIR failed to justify or take into consideration various impacts that the project would have on nearby residents and parks and failed to account for future development that the gondola might make possible. The lower court judge rejected those arguments, but an appellate panel disagreed, writing:
“We agree Metro’s decision to reject acoustic retrofitting as a potential mitigation measure was conclusory and lacked substantial evidentiary support…Metro’s assertion that acoustic retrofitting is ‘generally only considered as potential noise mitigation’ for ‘significant operational noise impacts’ similarly lacks substantial evidentiary support” and citing other issues.
REGISTERED SUPPORT / OPPOSITION:
Support
AARP
Accelerate Neighborhood Climate Action
Alameda County Transportation Commission
Alameda-Contra Costa Transit District (AC Transit)
All Voting Members of the North Westwood Neighborhood Council
American Planning Association, California Chapter
Bay Area Council
California Downtown Association
California Electric Transportation Coalition
California Hydrogen Business Council
California Transit Association
City and County of San Francisco
City of Alameda
City of Goleta
City of San Jose
City of Santa Monica
City/County Association of Governments of San Mateo County
Climate Action California
Foothill Transit
Los Angeles County Metropolitan Transportation Authority
Metropolitan Transportation Commission
Monterey-Salinas Transit (MST)
Orange County Transportation Authority
Orange County
Peninsula Corridor Joint Powers Board (CALTRAIN)
San Diego Association of Governments
San Diego Metropolitan Transit System
San Francisco Bay Area Rapid Transit District (BART)
San Francisco Bay Ferry
San Francisco Municipal Transportation Agency (SFMTA)
San Mateo County Transit District (SAMTRANS)
San Mateo County Transportation Authority
Santa Cruz Metropolitan Transit District
Solano County Transit (SOLTRANS)
Sonoma County Transportation Authority/Regional Climate Protection Authority
Southern California Regional Rail Authority (METROLINK)
SPUR
Stanislaus Regional Transit Authority
Streets for All
Sunline Transit Agency
Transform
Transportation Agency for Monterey County (TAMC)
Valley Industry & Commerce Association
Opposition
Citizens Committee to Complete the Refuge (unless amended)
Livable California
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 71 |
THIRD READING
Bill No: SB 71
Author: Wiener (D), et al.
Amended: 5/29/25
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 8-0, 3/19/25
AYES: Blakespear, Valladares, Dahle, Gonzalez, Hurtado, Menjivar, Padilla, Pérez
SENATE TRANSPORTATION COMMITTEE: 12-0, 4/8/25
AYES: Cortese, Strickland, Archuleta, Arreguín, Blakespear, Cervantes, Dahle, Gonzalez, Grayson, Menjivar, Richardson, Umberg
NO VOTE RECORDED: Limón, Seyarto, Valladares
SUBJECT: California Environmental Quality Act: exemptions: environmental leadership transit projects
SOURCE: California Transit Association
DIGEST:
This bill (1) removes the January 1, 2030 sunset on existing California Environmental Quality Act (CEQA) exemptions for various transportation plans and projects; (2) expands these exemptions to include, among others, Tier 4 or cleaner locomotives, shuttles and ferries and projects outside of urbanized areas or clusters, as specified, and (3) retains a January 1, 2040 sunset for transportation projects using near-zero emission, natural gas, or low- nitrogen oxide (NOx) technology.
Senate Floor Amendments of 5/29/25 strike “passenger rail” from the list of projects that are CEQA exempt.
ANALYSIS:
Existing law:
- Establishes the California Environmental Quality Act (CEQA). Under CEQA, a lead agency determines whether a project is exempt from CEQA, or if it must do an initial study to determine if a project will have significant effects on the environment. If a project has no effect on the environment or effects that can be mitigated, the lead agency prepares a negative declaration (ND) or mitigated ND (MND). If the project will have significant impacts, the lead agency prepares an environmental impact report (EIR) to evaluate and propose mitigation measures for any effects on the environment, including impacts or likely impacts to land, air, water, minerals, flora, fauna, ambient noise, and historic or aesthetic significance. (Public Resources Code (PRC) §§21000 et seq.)
- Exempts from CEQA, until January 1, 2030, active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles. (PRC § 21080.20)
- Exempts from CEQA, until January 1, 2030, certain transportation-related projects, including pedestrian and bicycle facilities, transit prioritization projects, public projects for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements (PRC § 21080.25):
- Requires that these exemptions, not including a project to reduce minimum parking requirements, meet the following criteria:
- Be carried out by a public agency and the public agency is the lead agency.
- Be located in an urbanized area.
- Be located on or within an existing public right-of-way.
- Does not add physical infrastructure that increases new automobile capacity on existing rights-of-way, except as provided.
- Does not require demolition of affordable housing units.
- Has a certification from the lead agency that the project will be completed by a skilled and trained workforce, except as provided.
- Requires that projects using this exemption and that exceed $100 million also meet the following criteria (PRC § 21080.25):
- Be incorporated in a regional transportation plan, sustainable communities’ strategy, general plan, or other plan that has undergone a programmatic-level environmental review within 10 years of the approval of the project.
- Fully mitigate construction impacts consistent with applicable law.
- Require the lead agency to complete and consider results of a project business case and a racial equity analysis, as specified.
- Require lead agency to hold noticed public hearings, as prescribed.
- Requires that projects using this exemption and that exceed $50 million also meet prescribed public notice and hearing requirements (PRC § 21080.25).
- Requires that these exemptions, not including a project to reduce minimum parking requirements, meet the following criteria:
- Establishes the Environmental Leadership Transit Development Program Defines an ELTP as a project to construct a fixed guideway and related fixed facilities that meets all of the following (PRC § 21168.6.9):
- The fixed guideway operates at zero emissions.
- The project meets certain greenhouse gas emission reduction requirements, depending on the length of the project, without using offsets, as specified.
- The project reduces no less than 30,000 vehicle miles traveled in the corridor of the project, as specified.
- The project is consistent with the applicable regional transportation plan and sustainable communities strategy or alternative planning strategy.
- The project applicant demonstrates how the applicant has incorporated sustainable infrastructure practices to achieve sustainability, resiliency, and climate change mitigation and adaptation goals in the project.
- The project is located wholly within the County of Los Angeles or connects to an existing project wholly located in the County of Los Angeles.
- Requires Judicial Council, on or before January 1, 2023, to adopt rules of court that would apply to an action or proceeding brought to attack, review, set aside, void, or annul the certification of an EIR for an ELTP, as defined by this bill, or the granting of any project approvals, requiring lawsuits and any appeals to be resolved, to the extent feasible, within 365 calendar days of filing the certified record of proceedings.
This bill:
- Removes the January 1, 2030 sunset on existing CEQA exemptions for various transportation plans and projects; retain a January 1, 2032, sunset for transportation projects using near-zero emission, natural gas, or low-NOx technology and a January 1, 2040 sunset for Tier 4 or cleaner locomotives; and expand the existing exemption to include changes to plans redesigning transit networks and for projects for microtransit, paratransit, shuttles, and ferries, as specified. In particular, this bill would:
- Removes the sunset on the existing CEQA exemption for various active transportation plans and expands the exemption to include a transit comprehensive operational analysis. Define “transit comprehensive operational analysis” to mean a plan that redesigns or modifies a transit operator’s or local agency’s public transit service network, including the routing of fixed route and microtransit services.
- Expands definition of “public transit operator” to also mean a public entity that provides contracted paratransit services and “transit prioritization projects” to also mean bus shelters and lighting.
- Removes the sunset on the existing CEQA exemption for certain transportation projects including pedestrian and bicycle facilities, transit prioritization projects, public projects for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as specified.
- Expands the exemption to include projects for the improvement, institution, or increase of microtransit, paratransit, shuttles and ferries and for Tier 4 or cleaner locomotives, as specified. Prohibits the exemption being used for projects for transit services operated by a transportation network company, as specified.
- Establishes a January 1, 2032, sunset for transportation projects using near-zero emission, natural gas, or low-NOx technology
- Establishes a January 1, 2040 sunset for Tier 4 or cleaner locomotives.
- Removes the requirement that projects be located on a site that is wholly within the boundaries of an urbanized area or urban cluster.
- Adjusts the way in which a project’s cost is assessed to determine if it costs more than $50 million or $100 million, which triggers certain requirements including holding public hearings. Specifically, this bill would require that the $50 million and $100 million threshold is based on the project engineer’s cost estimate, and require that these cost thresholds should be adjusted to the California Consumer Price Index (CPI).
- Remove specific elements to be contained in the required project business case for projects costing more than $100 million.
- Extends the 365 Judicial CEQA streamlining for Environmental Leadership Transit Projects from January 1, 2026, until January 1, 2027.
Background
- The A, B, C’s of CEQA. CEQA is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment. CEQA is enforced by civil lawsuits that can challenge any project’s environmental review.
Under CEQA, projects (unless they have a specific exemption) must undergo environmental analysis. This process starts with an initial study which determines what level of further environmental review is needed for a given project. If a project has no significant effects on the environment, or if those effects can be fully mitigated, the project can move forward with a ND or MND. If the initial study finds that the project has potential significant effects on the environment, then a full EIR is conducted. An EIR provides thorough environmental review of a proposed project, analyzing the significant direct and indirect environmental impacts of a proposed project. The EIR also includes proposed mitigation measures for any significant effects that it identifies and considers alternatives to the proposed project.
- Transportation Exemptions in CEQA. The majority of transportation projects are exempt from CEQA. Two Senate bills (SB 288, Wiener Chapter 200, Statutes of 202, and SB 922 Wiener, Chapter 987, Statutes of 2022) further expanded CEQA exemptions for certain clean and active transportation projects. Under the provision of these two bills, and another bill signed into law last year (AB 2503, Lee), the following transportation projects are exempt from CEQA until January 1, 2030:
- Pedestrian and bicycle facilities, including new facilities.
- Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians.
- Transit prioritization projects.
- Projects for the designation and conversion of general purpose lanes or highway shoulders to bus-only lanes.
- A public project for the institution or increase of new bus rapid transit, bus, or light rail service, including the construction of stations, as specified.
- A public project to construct or increase passenger rail service used for zero-emission trains.
- A public project to construct or maintain infrastructure to charge or refuel zero-emission transit buses, trains, or ferries, as specified.
- The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with one of these projects.
- A project carried out by a city or county to reduce minimum parking requirements.
Comments
- Purpose of Bill. According to the author, “Public Transportation is critical to California’s future. Streamlining climate-friendly sustainable transportation projects that improve public transportation and make our streets safer for pedestrians, bicyclists, and other vulnerable road users helps the state better deliver on its climate, housing, and social mobility goals. SB 71 makes a critical CEQA exemption - with environmental and other guardrails - for such projects that was first enacted with great success 5 years ago permanent, while slightly expanding and cleaning up the law. At a time when public transportation systems in California and across the nation face acute funding pressures and federal uncertainty, it is critical to enact this reform so that public transportation agencies and local agencies can continue to control capital costs and deliver projects without delay and associated cost increases from the bad-faith abuse of environmental laws. SB 71 will ensure that projects that help the state meet its climate goals, facilitate dense urban infill development, improve access to opportunity and mobility, and support high-quality construction jobs continue, and deliver on the promise of infrastructure investment.”
- What is the track record for the SB 288/SB 922 exemption? Before removing the sunset on the CEQA exemptions in SB 288/SB 922, it is worth knowing if the exemption (1) has been useful in deploying projects (2) has resulted in environmental costs and/or benefits. According to CEQAnet, the state’s database of filed CEQA documents, approximately 10 projects have used the PRC 21080.20 exemption, and over 100 projects have filed a notice of exemption for transportation projects under PRC Section 21080.25. In terms of speeding along deployment of clean and active transportation projects, the exemption has been a resounding success.
What have been the environmental effects of these projects? Many of the projects that have applied for exemption, as provided on CEQAnet, include bike lanes, bus stops, pedestrian paths and other relatively small projects that are likely to have few harmful environmental impacts as they improve active transportation and ideally, reduce reliance on gas-powered single-occupancy vehicles that generate air and greenhouse gas emissions. However, the exemption also includes a number of large projects that are likely to have significant impacts on the environment, such as Metro’s Next Gen Bus Plan, which will implement “The design and construction of new bus-only lanes and other transit priority improvements along up to 80 lane miles on the highest frequency corridors in the city of Los Angeles.[1]”Another example of a potentially high-impact project was one in which a building was demolished in order to stage a metro deboarding platform in San Diego. The NOE noted that the building to be demolished “contains asbestos and lead”. According to minutes of the meeting of the San Diego Metropolitan Transit System Board of Directors where the work order for the project was authorized and which determined that the project was CEQA exempt, the space where the building was demolished was to be “converted to employee parking”. These projects are likely to increase bus and metro ridership, but it is also possible that they could have other, less desirable impacts. As the impacts of large-scale projects using this exemption are still unfolding, it is worth considering if completely removing the sunset could lead to an accumulation of harmful impacts over time.
- Ferries, TNC’s, Tier 4 locomotives. SB 71 adds alternative fueled shuttles and ferries to the existing CEQA exemption for projects that build, improve, or increase bus, bus rapid transit, or bus, or light rail services, and creates a CEQA exemption for Tier 4 or cleaner locomotives. The exemption applies only to public agency projects: however, public agencies could choose to build infrastructure for privately owned shuttles, like building Uber and Lyft lanes for pickups at airports. To address this concern, this bill specifies that projects that infrastructure for microtransit will not include TNCs is contracted by the lead agency that uses a managed fleet of multipassenger vehicles dedicated to that service.
SB 71 also expands the exemption to apply to projects supporting deployment of Tier 4 or cleaner locomotives: a Tier 4 locomotive refers to a locomotive that meets the stringent emissions standards set by the US Environmental Protection Agency for new locomotive, which reduce harmful emissions like particulate matter (PM) and NOx (reduce PM and NOx 85% compared to older locomotives).
- Extending CEQA streamlining for transit leadership projects. Floor amendments to SB 71 provide a one-year extension on the sunset for the existing “environmental leadership transit development program” (ELTDP). These projects must meet certain environmental and labor criteria to be eligible for certification as ELTDPs. ELTDP projects are eligible for CEQA judicial streamlining: CEQA lawsuits against ELTDP’s must be reviewed by the courts, including all appeals, within 365 days as feasible.
Expedited judicial review provisions are intended to expedite beneficial development but entail potential tradeoffs with respect to the sufficiency of environmental review, the burden on courts, and access to justice for other litigants, a concern magnified by the judicial backlog arising from the COVID-19 pandemic.
One project that would benefit from the extension of this CEQA judicial streamlining is Dodger’s Stadium Gondola project, which is a certified ELTDP that has been tied up in a CEQA lawsuit. The Dodger’s Stadium Gondola project would run 1.2 miles between Union Station, LA's central transportation hub, and the Dodger’s stadium.
Two nonprofits had sued the lead agency (Metro) under CEQA, arguing that the EIR failed to justify or take into consideration various impacts that the project would have on nearby residents and parks and failed to account for future development that the gondola might make possible. The lower court judge rejected those arguments, but an appellate panel disagreed, writing :
"We agree Metro’s decision to reject acoustic retrofitting as a potential mitigation measure was conclusory and lacked substantial evidentiary support…Metro’s assertion that acoustic retrofitting is 'generally only considered as potential noise mitigation' for 'significant operational noise impacts' similarly lacks substantial evidentiary support” and citing other issues.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
- One-time costs likely around $100,000 - $150,000 and ongoing costs likely in the tens of thousands of dollars annually (General Fund) for the Governor’s Office of Land Use and Climate Innovation (LCI) to perform and support anticipated rulemaking as well as update existing technical assistance.
SUPPORT: (Verified 6/2/25)
California Transit Association (Source)
350 Bay Area Action
AARP
All Voting Members of the North Westwood Neighborhood Council
Association of California Cities - Orange County
Bay Area Council
Bike East Bay
California Bicycle Coalition
California Business Properties Association
California Downtown Association
California Electric Transportation Coalition
California Hydrogen Business Council
City and County of San Francisco
City of Goleta
City of Santa Monica
City/county Association of Governments of San Mateo County
East Bay Yimby
Greenbelt Alliance
Grow the Richmond
Kidsafe Sf
LA Metro
Los Angeles County Metropolitan Transportation Authority
Metropolitan Transportation Commission
Monterey-salinas Transit
Mountain View Yimby
Move LA
Napa-solano for Everyone
Northern Neighbors
Orange County Transportation Authority
Peninsula Corridor Joint Powers Board
Peninsula for Everyone
Redlands Yimby
Sacramento Regional Transit District
San Francisco Bay Ferry
San Francisco Bicycle Coalition
San Francisco Chamber of Commerce
San Francisco Municipal Transportation Agency
San Mateo County Transit District
San Mateo County Transportation Authority
Santa Cruz Yimby
Santa Rosa Yimby
Seamless Bay Area
Sf Yimby
South Bay Yimby
Spur
Streets for All
Sunline Transit Agency
Ventura County Yimby
Walk San Francisco Foundation
Yimby Action
Yimby LA
Yimby Slo
OPPOSITION: (Verified 6/2/25)
None received
Prepared by: Brynn Cook / E.Q. / (916) 651-4108
6/2/25 23:03:34
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 71 |
THIRD READING
Bill No: SB 71
Author: Wiener (D), et al.
Amended: 5/23/25
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 8-0, 3/19/25
AYES: Blakespear, Valladares, Dahle, Gonzalez, Hurtado, Menjivar, Padilla, Pérez
SENATE TRANSPORTATION COMMITTEE: 12-0, 4/8/25
AYES: Cortese, Strickland, Archuleta, Arreguín, Blakespear, Cervantes, Dahle, Gonzalez, Grayson, Menjivar, Richardson, Umberg
NO VOTE RECORDED: Limón, Seyarto, Valladares
SENATE APPROPRIATIONS COMMITTEE: 5-0, 5/23/25
AYES: Caballero, Cabaldon, Grayson, Richardson, Wahab
NO VOTE RECORDED: Seyarto, Dahle
SUBJECT: California Environmental Quality Act: exemptions: transit projects
SOURCE: Author
DIGEST:
This bill removes the January 1, 2030 sunset on existing California Environmental Quality Act (CEQA) exemptions for various transportation plans and projects; retains a January 1, 2040, sunset for transportation projects using near-zero emission, natural gas, or low-NOx technology and expands the exemption to include Tier 4 or cleaner locomotives ; and expands the existing exemption to include changes to plans redesigning transit networks and for projects for microtransit, paratransit, shuttles, and ferries, as specified.
ANALYSIS:
Existing law:
- Under CEQA, a lead agency determines whether a project is exempt from CEQA, or if it must do an initial study to determine if a project will have significant effects on the environment. If a project has no effect on the environment or effects that can be mitigated, the lead agency prepares a negative declaration (ND) or mitigated ND (MND). If the project will have significant impacts, the lead agency prepares an environmental impact report (EIR) to evaluate and propose mitigation measures for any effects on the environment, including impacts or likely impacts to land, air, water, minerals, flora, fauna, ambient noise, and historic or aesthetic significance. (Public Resources Code (PRC) §§21000 et seq.)
- CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles. (PRC § 21080.20)
- CEQA, until January 1, 2030, exempts certain transportation-related projects, including pedestrian and bicycle facilities, transit prioritization projects, public projects for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements (PRC § 21080.25).
- Requires that these exemptions, not including a project to reduce minimum parking requirements, meet the following criteria:
- Be carried out by a public agency and the public agency is the lead agency.
- Be located in an urbanized area.
- Be located on or within an existing public right-of-way.
- Does not add physical infrastructure that increases new automobile capacity on existing rights-of-way, except as provided.
- Does not require demolition of affordable housing units.
- Has a certification from the lead agency that the project will be completed by a skilled and trained workforce, except as provided.
- Requires that projects using this exemption and that exceed $100 million also meet the following criteria (PRC § 21080.25):
- Be incorporated in a regional transportation plan, sustainable communities’ strategy, general plan, or other plan that has undergone a programmatic-level environmental review within 10 years of the approval of the project.
- Fully mitigate construction impacts consistent with applicable law.
- Require the lead agency to complete and consider results of a project business case and a racial equity analysis, as specified.
- Require lead agency to hold noticed public hearings, as prescribed.
- Requires that projects using this exemption and that exceed $50 million also meet prescribed public notice and hearing requirements (PRC § 21080.25).
- Requires that these exemptions, not including a project to reduce minimum parking requirements, meet the following criteria:
This bill:
- Removes the January 1, 2030 sunset on existing CEQA exemptions for various transportation plans and projects; retains a January 1, 2040, sunset for transportation projects using near-zero emission, natural gas, or low-NOx technology and Tier 4 or cleaner locomotives; and expands the existing exemption to include changes to plans redesigning transit networks and for projects for microtransit, paratransit, shuttles, and ferries, as specified.
- Removes the sunset on the existing CEQA exemption for various active transportation plans and expands the exemption to include a transit comprehensive operational analysis. Defines “transit comprehensive operational analysis” to mean a plan that redesigns or modifies a transit operator’s or local agency’s public transit service network, including the routing of fixed route and microtransit services.
- Expands definition of “public transit operator” to also mean a public entity that provides contracted paratransit services and “transit prioritization projects” to also mean bus shelters and lighting.
- Removes the sunset on the existing CEQA exemption for certain transportation projects including pedestrian and bicycle facilities, transit prioritization projects, public projects for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as specified.
- Expands the exemption to include projects for the improvement, institution, or increase of microtransit, paratransit, shuttles and ferries and for Tier 4 or cleaner locomotives. Prohibits the exemption being used for projects used by articulated buses. Prohibits the exemption being used for projects for transit services operated by a transportation network company, as specified.
- Restricts the exemption by requiring a sunset on January 1, 2040, for transportation projects using near-zero emission, natural gas, or low-NOx technology or Tier 4 or cleaner locomotives.
- Removes the requirement that these projects be located on a site that is wholly within the boundaries of an urbanized area or urban cluster.
- Adjusts the way in which a project’s cost is assessed to determine if it costs more than $50 million or $100 million, which triggers certain requirements including holding public hearings. Requires that the $50 million and $100 million threshold is based on the project engineer’s cost estimate, and requires that these cost thresholds should be adjusted to the California Consumer Price Index (CPI).
- Removes specific elements to be contained in the required project business case for projects costing more than $100 million.
Background
- The A, B, C’s of CEQA. CEQA is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment. CEQA is enforced by civil lawsuits that can challenge any project’s environmental review.
Under CEQA, projects (unless they have a specific exemption) must undergo environmental analysis. This process starts with an initial study which determines what level of further environmental review is needed for a given project. If a project has no significant effects on the environment, or if those effects can be fully mitigated, the project can move forward with a ND or MND. If the initial study finds that the project has potential significant effects on the environment, then a full EIR is conducted. An EIR provides thorough environmental review of a proposed project, analyzing the significant direct and indirect environmental impacts of a proposed project. The EIR also includes proposed mitigation measures for any significant effects that it identifies and considers alternatives to the proposed project.
- Transportation Exemptions in CEQA. The majority of transportation projects are exempt from CEQA. In October 2017, this committee conducted a survey of state agencies regarding CEQA to gain a better understanding of CEQA compliance and litigation. The survey covered a period of five years, Fiscal Years 2011/12 to 2015/16. The Department of Transportation (DOT) reported a total of 3,259 projects during the five-year period, and almost 90% of these projects were exempt from CEQA.
Since this survey was conducted, two Senate bills (SB 288, (Wiener, Chapter 200, Statutes of 2020), and SB 922 (Wiener, Chapter 987, Statutes of 2022)) further expanded CEQA exemptions for certain clean and active transportation projects. Under the provision of these two bills, and another bill signed into law last year (AB 2503, (Lee, Chapter 718, Statutes of 2024)), the following transportation projects are exempt from CEQA until January 1, 2030:
- Pedestrian and bicycle facilities, including new facilities.
- Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians.
- Transit prioritization projects.
- Projects for the designation and conversion of general purpose lanes or highway shoulders to bus-only lanes.
- A public project for the institution or increase of new bus rapid transit (BRT), bus, or light rail service, including the construction of stations, as specified.
- A public project to construct or increase passenger rail service used for zero-emission trains.
- A public project to construct or maintain infrastructure to charge or refuel zero-emission transit buses, trains, or ferries, as specified.
- The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with one of these projects.
- A project carried out by a city or county to reduce minimum parking requirements.
Many of these exemptions are broad –to provide a backstop to ensure that only active and clean transportation projects are eligible for this CEQA exemption, the exemption also includes a guardrail that specifies projects are not eligible for this CEQA exemption if they induce single-occupancy vehicle trips, add additional highway lanes, or widen highways.
Comments
- Purpose of Bill. According to the author, “Public Transportation is critical to California’s future. Streamlining climate-friendly sustainable transportation projects that improve public transportation and make our streets safer for pedestrians, bicyclists, and other vulnerable road users helps the state better deliver on its climate, housing, and social mobility goals. SB 71 makes a critical CEQA exemption - with environmental and other guardrails - for such projects that was first enacted with great success 5 years ago permanent, while slightly expanding and cleaning up the law. At a time where public transportation systems in California and across the nation face acute funding pressures and federal uncertainty, it is critical to enact this reform so that public transportation agencies and local agencies can continue to control capital costs and deliver projects without delay and associated cost increases from the bad-faith abuse of environmental laws. SB 71 will ensure that projects that help the state meet its climate goals, facilitate dense urban infill development, improve access to opportunity and mobility, and support high-quality construction jobs continue, and deliver on the promise of infrastructure investment.”
- “Environmental” projects can still have environmental impacts. Bike lanes, buses, zero emission trains and other “clean transportation” projects can reduce greenhouse gas and local air pollution emissions if they replace gas-powered vehicles. These types of projects can also improve quality of life in communities by increasing mobility options. However, even projects that have environmental and social benefits can come with environmental impacts. SB 71 includes a large suite of transportation projects, including projects that are likely to have small impacts if any (like adding lighting to bus stops), and projects that are likely to have significant environmental impacts, like infrastructure for hydrogen rail or ferry terminals. Under CEQA, impacts associated with those projects would have to be studied, and mitigated as feasible. Providing a CEQA exemption for these projects means that those impacts may go undisclosed to the communities they are located in, and any harmful impacts would go unmitigated.
- What is the track record for the SB 288/SB 922 exemption? Before removing the sunset on the CEQA exemptions in SB 288/SB 922, it is worth knowing if the exemption (1) has been useful in deploying projects (2) has resulted in environmental costs and/or benefits.
According to CEQAnet, the state’s database of filed CEQA documents, approximately 10 projects have used the PRC 21080.20 exemption, and over 100 projects have filed a notice of exemption for transportation projects under PRC Section 21080.25. In terms of speeding along deployment of clean and active transportation projects, the exemption has been a resounding success.
What have been the environmental effects of these projects? The benefits and impacts of these projects are varied as the projects themselves, and the potential for big impacts may scale with the potential for big benefits. Many of the projects that have applied for exemption, as provided on CEQAnet, include bike lanes, bus stops, pedestrian paths and other relatively small projects that are likely to have few harmful environmental impacts as they improve active transportation and ideally, reduce reliance on gas-powered single-occupancy vehicles that generate air and greenhouse gas emissions. However, the exemption also includes a number of large projects that are likely to have significant impacts on the environment, such as Metro’s Next Gen Bus Plan, which will implement “The design and construction of new bus-only lanes and other transit priority improvements along up to 80 lane miles on the highest frequency corridors in the city of Los Angeles.[1]”Another example of a potentially high-impact project was one in which a building was demolition in order to more easily stage the building of additional bus bays and a metro deboarding platform in San Diego. The notice of exemption for this project noted that the building to be demolished “contains asbestos and lead”. According to minutes of the meeting of the San Diego Metropolitan Transit System Board of Directors where the work order for the project was authorized and which determined that the project was CEQA exempt, the space where the building was demolished was to be “converted to employee parking”. These projects are likely to increase bus and metro ridership, but it is also possible that they could have other, less desirable impacts. As the impacts of large-scale projects using this exemption are still unfolding, it is worth considering if completely removing the sunset could lead to an accumulation of harmful impacts over time.
- Ferries, TNC’s, Tier 4 locomotives. SB 71 adds alternative fueled shuttles and ferries to the existing CEQA exemption for projects that build, improve, or increase bus, bus rapid transit, or bus, or light rail services, and creates a CEQA exemption for Tier 4 or cleaner locomotives. The exemption applies only to public agency projects: however, public agencies could choose to build infrastructure for privately owned shuttles, like building Uber and Lyft lanes for pickups at airports. On its website, Lyft states that it, “Works with local governments to improve access to transit, and to provide rides to and from transit stations.”[2] To address this concern, the bill specifies that projects that infrastructure for microtransit will not include TNCs is contracted by the lead agency that uses a managed fleet of multipassenger vehicles dedicated to that service.
Related/Prior Legislation
AB 35 (Alvarez, 2025) would limit, until January 1, 2036, CEQA review for “clean hydrogen transportation projects”, require the lead agency to determine whether to approve a “clean hydrogen environmental assessment” used in lieu of CEQA documentation and issue a discretionary permit or authorization for the project no later than 270 days after the application for the project is deemed complete. The bill would further require any lawsuits against a “clean hydrogen transportation project”, including all appeals and as feasible be resolve within 270 days.
AB 2503 (Lee, Chapter 718, Statutes of 2024) expands existing California Environmental Quality Act (CEQA) exemptions for transit projects to include public project for the institution or increase of zero-emission passenger rail service within an existing rail or highway right-of-way.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee:
- One-time costs likely around $100,000 - $150,000 and ongoing costs likely in the tens of thousands of dollars annually (General Fund) for the Governor’s Office of Land Use and Climate Innovation (LCI) to perform and support anticipated rulemaking as well as update existing technical assistance.
SUPPORT: (Verified 5/23/25)
350 Bay Area Action
AARP
All Voting Members of the North Westwood Neighborhood Council
Association of California Cities - Orange County
Bay Area Council
Bike East Bay
California Bicycle Coalition
California Business Properties Association
California Downtown Association
California Electric Transportation Coalition
California Hydrogen Business Council
California Transit Association
City and County of San Francisco
City of Goleta
City of Santa Monica
City/county Association of Governments of San Mateo County
East Bay Yimby
Greenbelt Alliance
Grow the Richmond
Kidsafe Sf
LA Metro
Los Angeles County Metropolitan Transportation Authority
Metropolitan Transportation Commission
Monterey-salinas Transit
Mountain View Yimby
Move LA
Napa-solano for Everyone
Northern Neighbors
Orange County Transportation Authority
Peninsula Corridor Joint Powers Board
Peninsula for Everyone
Redlands Yimby
Sacramento Regional Transit District
San Francisco Bay Ferry
San Francisco Bicycle Coalition
San Francisco Chamber of Commerce
San Francisco Municipal Transportation Agency
San Mateo County Transit District
San Mateo County Transportation Authority
Santa Cruz Yimby
Santa Rosa Yimby
Seamless Bay Area
Sf Yimby
South Bay Yimby
Spur
Streets for All
Sunline Transit Agency
Ventura County Yimby
Walk San Francisco Foundation
Yimby Action
Yimby LA
Yimby SLO
OPPOSITION: (Verified 5/23/25)
Prepared by: Brynn Cook / E.Q. / (916) 651-4108
5/27/25 11:29:55
**** END ****
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
SB 71 (Wiener) - California Environmental Quality Act: exemptions: transit projects
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would remove the January 1, 2030 sunset on existing California Environmental Quality Act (CEQA) exemptions for various transportation plans and projects; retain a January 1, 2032, sunset for transportation projects using near-zero emission, natural gas, or low-NOx technology; and expand the existing exemption to include changes to plans redesigning transit networks and for projects for microtransit, paratransit, shuttles, and ferries, as specified.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on May 23, 2025
Fiscal Impact:
- One-time costs likely around $100,000 - $150,000 and ongoing costs likely in the tens of thousands of dollars annually (General Fund) for the Governor’s Office of Land Use and Climate Innovation (LCI) to perform and support anticipated rulemaking as well as update existing technical assistance.
Author Amendments:
Author amendments would allow transit network company projects to use the exemption and make other changes.
Committee Amendments:
Committee amendments would expand eligibility to specified passenger rail projects and remove the requirement for projects to be within an urban cluster.
-- END --
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
SB 71 (Wiener) - California Environmental Quality Act: exemptions: transit projects
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would remove the January 1, 2030 sunset on existing California Environmental Quality Act (CEQA) exemptions for various transportation plans and projects; retain a January 1, 2032, sunset for transportation projects using near-zero emission, natural gas, or low-NOx technology; and expand the existing exemption to include changes to plans redesigning transit networks and for projects for microtransit, paratransit, shuttles, and ferries, as specified.
Fiscal Impact:
- The Governor’s Office of Land Use and Climate Innovation (LCI) estimates one-time costs of about $120,000 and ongoing costs of approximately $81,000 annually (General Fund) to perform and support anticipated rulemaking as well as update existing technical assistance.
Background:
A project is exempt from CEQA if it is ministerial (i.e., it does not involve discretionary decisions), or if there is a specific statutory or categorical exemption that applies to the project. Statutory exemptions are created by the Legislature and typically apply even if a project has the potential to significantly affect the environment. In contrast, categorical exemptions, which are listed in the CEQA guidelines, generally do not apply if there are significant environmental impacts associated with the project, including if (1) there is a reasonable possibility of a significant effect on the environment due to unusual circumstances; (2) significant cumulative impacts from projects of the same type will result; or (3) the project will have impacts on a uniquely sensitive environment.
Transportation Exemptions in CEQA. The majority of transportation projects are exempt from CEQA. In fact, in 2017, research conducted by the Senate Environmental Quality committee determined that the California Department of Transportation (Caltrans) identified a total of 3,259 projects during five-year period with almost 90% of these projects exempt from CEQA.
Since then, two bills (SB 288, Wiener Chapter 200, Statutes of 202, and SB 922 Wiener, Chapter 987, Statutes of 2022) further expanded CEQA exemptions for certain transit and active transportation projects. Under the provision of these two bills, and another bill signed into law last year (AB 2503, Lee), the following transportation projects are exempt from CEQA until January 1, 2030:
- Pedestrian and bicycle facilities, including new facilities.
- Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians.
- Transit prioritization projects.
- Projects for the designation and conversion of general purpose lanes or highway shoulders to bus-only lanes.
- A public project for the institution or increase of new bus rapid transit (BRT), bus, or light rail service, including the construction of stations, as specified.
- A public project to construct or increase passenger rail service used for zero-emission trains.
- A public project to construct or maintain infrastructure to charge or refuel zero-emission transit buses, trains, or ferries, as specified.
- The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with one of these projects.
- A project carried out by a city or county to reduce minimum parking requirements.
Many of these exemptions are broad –to provide a backstop to ensure that only active and clean transportation projects are eligible for this CEQA exemption, the exemption also includes guardrails that specifies projects are not eligible for this CEQA exemption if they induce single-occupancy vehicle trips, add additional highway lanes, or widen highways. Additionally, projects estimated to cost over $50 million and $100 million trigger specific criteria and requirements for further vetting of the projects, including public hearings.
According to CEQAnet, the state’s database of filed CEQA documents, approximately 10 projects have used the planning exemption (Public Resources Code 21080.20), and over 100 projects have filed a notice of exemption for transportation projects (PRC Section 21080.25). For example, many of the projects that have applied for exemption, as provided on CEQAnet, include bike lanes, bus stops, pedestrian paths and other relatively small projects that are likely to have few harmful environmental impacts as they improve active transportation and encourage mode shift.
Additionally, the exemption includes a number of large projects, such as Metro’s Next Gen Bus Plan, which will implement “the design and construction of new bus-only lanes and other transit priority improvements along up to 80 lane miles on the highest frequency corridors in the city of Los Angeles.”
Proposed Law:
This bill would remove the January 1, 2030 sunset on existing CEQA exemptions for various transportation plans and projects; retain a January 1, 2032, sunset for transportation projects using near-zero emission, natural gas, or low-NOx technology; and expand the existing exemption to include changes to plans redesigning transit networks and for projects for microtransit, paratransit, shuttles, and ferries, as specified. In particular, this bill would:
- Remove the sunset on the existing CEQA exemption for various active transportation plans and expands the exemption to include a transit comprehensive operational analysis. Define “transit comprehensive operational analysis” to mean a plan that redesigns or modifies a transit operator’s or local agency’s public transit service network, including the routing of fixed route and microtransit services.
- Expand definition of “public transit operator” to also mean a public entity that provides contracted paratransit services.
- Expand detention of “transit prioritization projects” to also mean bus shelters and lighting.
- Remove the sunset on the existing CEQA exemption for certain transportation projects including pedestrian and bicycle facilities, transit prioritization projects, public projects for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as specified.
- Expand the exemption to include projects for the improvement, institution, or increase of microtransit, paratransit, shuttles and ferries. Prohibits the exemption being used for projects used by articulated buses. Prohibits the exemption being used for projects for transit services operated by a transportation network company, as specified.
- Restrict the exemption by requiring a sunset on January 1, 2032, for transportation projects using near-zero emission, natural gas, or low-NOx technology.
- Clarify the requirements for the lead agency to take to approve a project.
- Adjust the way in which a project’s cost is assessed to determine if it costs more than $50 million or $100 million, which triggers certain requirements including holding public hearings. Specifically, the bill would require that the $50 million and $100 million threshold is based on the project engineer’s cost estimate, and require that these cost thresholds should be adjusted to the California Consumer Price Index (CPI).
- Remove specific elements to be contained in the required project business case for projects costing more than $100 million.
- Contain other technical and clarifying changes.
Related Legislation:
AB 35 (Alvarez, 2025) would limit, until January 1, 2036, CEQA review for “clean hydrogen transportation projects”, require the lead agency to determine whether to approve a “clean hydrogen environmental assessment” used in lieu of CEQA documentation and issue a discretionary permit or authorization for the project no later than 270 days after the application for the project is deemed complete. The bill would further require any lawsuits against a “clean hydrogen transportation project”, including all appeals and as feasible be resolve within 270 days.
AB 2503 (Lee, Chapter 718, Statutes of 2024) expands existing CEQA exemptions for transit projects to include public project for the institution or increase of zero-emission passenger rail service within an existing rail or highway right-of-way.
SB 922 (Wiener, Chapter 987, Statutes of 2022) expands CEQA exemptions for specified transit, bicycle, and pedestrian and other transportation projects, and extends these exemptions from 2023 to 2030.
SB 288 (Wiener, Chapter 200, Statutes of 2020) -exempts from CEQA specified transit, bicycle, and pedestrian and other transportation projects, through January 1, 2023.
-- END --
SENATE COMMITTEE ON TRANSPORTATION
Senator Dave Cortese, Chair
2025 - 2026 Regular
Bill No: SB 71 Hearing Date: 4/8/2025
Author: | Wiener | ||
Version: | 3/25/2025 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Melissa White | ||
SUBJECT: California Environmental Quality Act: exemptions: transit projects
DIGEST: This bill removes the January 1, 2030 sunset on existing California Environmental Quality Act (CEQA) exemptions for various transportation plans and projects. Retains a January 1, 2032, sunset for transportation projects using near-zero emission, natural gas, or low-NOx technology. Expands the existing exemption to include changes to plans redesigning transit networks and for projects for microtransit, paratransit, shuttles, and ferries, as specified.
ANALYSIS:
Existing law:
- Under the California Environmental Quality Act (CEQA), a lead agency determines whether a project is exempt from CEQA, or if it must do an initial study to determine if a project will have significant effects on the environment. If a project has no effect on the environment or effects that can be mitigated, the lead agency prepares a negative declaration (ND) or mitigated ND (MND). If the project will have significant impacts, the lead agency prepares an environmental impact report (EIR) to evaluate and propose mitigation measures for any effects on the environment, including impacts or likely impacts to land, air, water, minerals, flora, fauna, ambient noise, and historic or aesthetic significance.
- CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.
- CEQA, until January 1, 2030, exempts certain transportation-related projects, including pedestrian and bicycle facilities, transit prioritization projects, public projects for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements
- Requires that these exemptions, not including a project, to reduce minimum parking requirements, meet the following criteria:
- Be carried out by a public agency and the public agency is the lead agency.
- Be located in an urbanized area.
- Be located on or within an existing public right-of-way.
- Does not add physical infrastructure that increases new automobile capacity on existing rights-of-way, except as provided.
- Does not require demolition of affordable housing units.
- Has a certification from the lead agency that the project will be completed by a skilled and trained workforce, except as provided.
- Requires that projects using this exemption and that exceed $100 million also meet the following criteria:
- Be incorporated in a regional transportation plan, sustainable communities’ strategy, general plan, or other plan that has undergone a programmatic-level environmental review within 10 years of the approval of the project.
- Fully mitigate construction impacts consistent with applicable law.
- Require the lead agency to complete and consider results of a project business case and a racial equity analysis, as specified.
- Require lead agency to hold noticed public hearings, as prescribed.
- Requires that projects using this exemption and that exceed $50 million also meet prescribed public notice and hearing requirements.
This bill:
- Removes the sunset on the existing CEQA exemption for various active transportation plans and expands the exemption to include a transit comprehensive operational analysis. Defines “transit comprehensive operational analysis” to mean a plan that redesigns or modifies a transit operator’s or local agency’s public transit service network, including the routing of fixed route and microtransit services.
- Expands definition of “public transit operator” to also mean a public entity that provides contracted paratransit services.
- Expands detention of “transit prioritization projects” to also mean bus shelters and lighting.
- Removes the sunset on the existing CEQA exemption for certain transportation projects including pedestrian and bicycle facilities, transit prioritization projects, public projects for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as specified.
- Expands the exemption to include projects for the improvement, institution, or increase of microtransit, paratransit, shuttles and ferries. Prohibits the exemption being used for projects used by articulated buses. Prohibits the exemption being used for projects for transit services operated by a transportation network company, as specified.
- Restricts the exemption by requiring a sunset on January 1, 2032, for transportation projects using near-zero emission, natural gas, or low-NOx technology.
- Clarifies the requirements for the lead agency to take to approve a project.
- Adjusts the way in which a project’s cost is assessed to determine if it costs more than $50 million or $100 million, which triggers certain requirements including holding public hearings. Specifically, the bill requires that the $50 million and $100 million threshold is based on the project engineer’s cost estimate, and requires that these cost thresholds should be adjusted to the California Consumer Price Index (CPI).
- Removes specific elements to be contained in the required project business case for projects costing more than $100 million.
- Contains other technical and clarifying changes.
COMMENTS:
- Purpose of the bill. According to the author, “Public Transportation is critical to California’s future. Streamlining climate-friendly sustainable transportation projects that improve public transportation and make our streets safer for pedestrians, bicyclists, and other vulnerable road users helps the state better deliver on its climate, housing, and social mobility goals. SB 71 makes a critical CEQA exemption - with environmental and other guardrails - for such projects that was first enacted with great success 5 years ago permanent, while slightly expanding and cleaning up the law. At a time where public transportation systems in California and across the nation face acute funding pressures and federal uncertainty, it is critical to enact this reform so that public transportation agencies and local agencies can continue to control capital costs and deliver projects without delay and associated cost increases from the bad-faith abuse of environmental laws. SB 71 will ensure that projects that help the state meet its climate goals, facilitate dense urban infill development, improve access to opportunity and mobility, and support high-quality construction jobs continue, and deliver on the promise of infrastructure investment.”
- Transportation and climate change. California’s transportation network consists of streets, highways, railways, bicycle routes, and pedestrian pathways. This network provides people and businesses the ability to access destinations and move goods and services throughout the state. Construction, operations, and maintenance responsibilities are shared amongst state, regional, tribal and local governments. Funding for these activities comes from federal, state, and local taxes, fees and assessments, private investments and tribal investments. This collaborative effort results in a well-integrated transportation network that provides mobility for 40 million people, while helping California sustain its position as the world’s fourth largest economy. Currently, roughly $35 billion (federal, state, and local funds combined) is spent annually in California on building and maintaining the transportation network. Additionally, the federal Infrastructure Investment and Jobs Act (IIJA, P.L. 117- 58), was expected to provide California with approximately $40 billion over five years.
Emissions from the transportation sector, the state’s largest source of GHGs, are still on the rise despite statewide GHG emission reduction efforts and increasingly ambitious targets. According to California Air Resources Board (ARB)’s GHG emission inventory, the transportation sector emissions have grown to 41% of California’s total emissions as of 2017. A 2018 Legislative Analyst’s Office report found that roughly 90% of the transportation sector’s emissions were from on-road sources – 69% passenger vehicles and 22% heavy-duty vehicles. Within the transportation sector, measures to reduce GHG emissions include requiring the use of low carbon fuels, cleaner vehicles, and strategies to promote sustainable communities, and improved transportation choices that reduce growth in the number of vehicle miles traveled (VMT).
ARB’s 2022 Scoping Plan scenario for achieving 85% GHG emission reductions by 2045 calls for a 25% reduction in VMT by 2030 and a 30% reduction in VMT by 2045. Mode shift – getting people out of their cars and onto public transit and active transportation – is an important component of success. For example, achieving these VMT targets through shifting to transit means California would need a five to 10 times ridership increase from pre-COVID levels by 2045.
- The A, B, C’s of CEQA. CEQA is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment. CEQA is enforced by civil lawsuits that can challenge any project’s environmental review.
Under CEQA, projects (unless they have a specific exemption) must undergo environmental analysis. This process starts with an initial study which determines what level of further environmental review is needed for a given project. If a project has no significant effects on the environment, or if those effects can be fully mitigated, the project can move forward with a negative declaration (ND) or mitigated negative declaration (MND). If the initial study finds that the project has potential significant effects on the environment, then a full EIR is conducted. An EIR provides thorough environmental review of a proposed project, analyzing the significant direct and indirect environmental impacts of a proposed project. The EIR also includes proposed mitigation measures for any significant effects that it identifies and considers alternatives to the proposed project.
- CEQA exemptions. A project is exempt from CEQA if it is ministerial (i.e., it does not involve discretionary decisions), or if there is a specific statutory or categorical exemption that applies to the project. Statutory exemptions are created by the Legislature and typically apply even if a project has the potential to significantly affect the environment. In contrast, categorical exemptions, which are listed in the CEQA guidelines, generally do not apply if there are significant environmental impacts associated with the project, including if (1) there is a reasonable possibility of a significant effect on the environment due to unusual circumstances; (2) significant cumulative impacts from projects of the same type will result; or (3) the project will have impacts on a uniquely sensitive environment.
- Transportation Exemptions in CEQA. The majority of transportation projects are exempt from CEQA. In fact, in 2017, research conducted by the Senate Environmental Quality committee determined that the California Department of Transportation (Caltrans) identified a total of 3,259 projects during five-year period with almost 90% of these projects exempt from CEQA.
Since then, two bills (SB 288, Wiener Chapter 200, Statutes of 202, and SB 922 Wiener, Chapter 987, Statutes of 2022) further expanded CEQA exemptions for certain transit and active transportation projects. Under the provision of these two bills, and another bill signed into law last year (AB 2503, Lee), the following transportation projects are exempt from CEQA until January 1, 2030:
- Pedestrian and bicycle facilities, including new facilities.
- Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians.
- Transit prioritization projects.
- Projects for the designation and conversion of general purpose lanes or highway shoulders to bus-only lanes.
- A public project for the institution or increase of new bus rapid transit (BRT), bus, or light rail service, including the construction of stations, as specified.
- A public project to construct or increase passenger rail service used for zero-emission trains.
- A public project to construct or maintain infrastructure to charge or refuel zero-emission transit buses, trains, or ferries, as specified.
- The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with one of these projects.
- A project carried out by a city or county to reduce minimum parking requirements.
Many of these exemptions are broad –to provide a backstop to ensure that only active and clean transportation projects are eligible for this CEQA exemption, the exemption also includes guardrails that specifies projects are not eligible for this CEQA exemption if they induce single-occupancy vehicle trips, add additional highway lanes, or widen highways. Additionally, projects estimated to cost over $50 million and $100 million trigger specific criteria and requirements for further vetting of the projects, including public hearings.
According to CEQAnet, the state’s database of filed CEQA documents, approximately 10 projects have used the planning exemption (Public Resources Code 21080.20), and over 100 projects have filed a notice of exemption for transportation projects (PRC Section 21080.25). For example, many of the projects that have applied for exemption, as provided on CEQAnet, include bike lanes, bus stops, pedestrian paths and other relatively small projects that are likely to have few harmful environmental impacts as they improve active transportation and encourage mode shift.
Additionally, the exemption includes a number of large projects, such as Metro’s Next Gen Bus Plan, which will implement “the design and construction of new bus-only lanes and other transit priority improvements along up to 80 lane miles on the highest frequency corridors in the city of Los Angeles.”
- SB 71 wants to make it permanent. SB 71 would eliminate the sunset for both the transportation plan and project exemptions. Additionally, the bill would expand the existing transportation plan exemption to include a transit comprehensive operational analysis, which is a plan to redesign or modify a transit operator or local agency’s public transit network. SB 71 also expands the existing project exemption to include projects for microtransit, paratransit, shuttles, and ferries. The bill prohibits the exemption being used for TNCs, like Uber or Lyft, which do contract with some public transit agencies to provide last mile services.
However, the exemptions are not forever for everyone. The bill simply extends the sunset, until January 1, 2032, for transportation projects using near-zero emission, natural gas, or low-NOx technology to further support the transition to zero-emission technology.
SB 71 makes other clarifying changes to the existing exemptions, including defining a “point in time” for project estimates for projects over $50 million or over $100 million. Under current law, these thresholds trigger certain additional criteria and requirements of the project sponsor, inducing public hearings. The bill would define the point in time as based on the project engineer’s costs estimate at the time the lead agency takes action to approve the project at a public meeting. The bill also allows for the thresholds to increase annually by the CPI.
Writing as the co-sponsors of the bill, the California Transit Association, Bay Area Council, SPUR, and LA Metro note, “Since the passage of SB 288 in 2020, over 90 projects have moved forward more quickly and cost effectively, including transit priority projects, bicycle & pedestrian projects, bus rapid transit projects, traffic calming projects, zero-emission vehicle charging infrastructure, ADA curb and sidewalk repairs, and transit maintenance facility modernization. As such, we believe the state should make the exemptions permanent, creating long-term certainty for local agencies as they continue to advance projects that further clean transportation options and make public transit more equitable and accessible.”
Writing with an “oppose unless amended” position, Citizens Committee to Complete the Refuge, note “We have substantive concerns regarding the proposed blanket exemption for required CEQA environmental review for construction of new ferry terminals, or expansion of existing ferry terminals, and ferry operations due to potential significant and unmitigated adverse impacts to San Francisco Bay sensitive habitats and wildlife. For this reason, we must oppose the bill, unless amended to exclude construction of new, or expansion of existing, ferry terminals and associated operations.”
Related/PREVIOUS Legislation:
AB 35 (Alvarez, 2025) -- Would limit, until January 1, 2036, CEQA review for “clean hydrogen transportation projects”, require the lead agency to determine whether to approve a “clean hydrogen environmental assessment” used in lieu of CEQA documentation and issue a discretionary permit or authorization for the project no later than 270 days after the application for the project is deemed complete. The bill would further require any lawsuits against a “clean hydrogen transportation project”, including all appeals and as feasible be resolve within 270 days.
AB 2503 (Lee, Chapter 718, Statutes of 2024) -- Expands existing CEQA exemptions for transit projects to include public project for the institution or increase of zero-emission passenger rail service within an existing rail or highway right-of-way.
SB 922 (Wiener, Chapter 987, Statutes of 2022) -- Expands CEQA exemptions for specified transit, bicycle, and pedestrian and other transportation projects, and extends these exemptions from 2023 to 2030.
SB 288 (Wiener, Chapter 200, Statutes of 2020) -- Exempts from CEQA specified transit, bicycle, and pedestrian and other transportation projects, through January 1, 2023.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
POSITIONS: (Communicated to the committee before noon on Wednesday,
April 2, 2025.)
SUPPORT:
350 Bay Area Action
AARP
Alameda County Transportation Commission
Bay Area Council
Bike East Bay
California Association of Councils of Governments
California Bicycle Coalition
California Business Properties Association
California Electric Transportation Coalition
California Hydrogen Business Council
California Transit Association
City and County of San Francisco
City of Goleta
Climate Action California
Greenbelt Alliance
Kidsafe SF
Los Angeles County Metropolitan Transportation Authority
Metropolitan Transportation Commission
Monterey-Salinas Transit (MST)
Move LA
Natural Resources Defense Council
Orange County Transportation Authority
Peninsula Corridor Joint Powers Board (CALTRAIN)
Sacramento Regional Transit District
San Francisco Bay Ferry
San Francisco Bicycle Coalition
San Francisco Chamber of Commerce
San Francisco Municipal Transportation Agency (SFMTA)
San Mateo County Transit District
San Mateo County Transportation Authority
Santa Cruz Metropolitan Transit District
Seamless Bay Area
Spur
Streets for All
Sunline Transit Agency
Walk San Francisco Foundation
OPPOSITION:
Citizens Committee to Complete the Refuge (oppose unless amended)
-- END --
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Blakespear, Chair
2025 - 2026 Regular
Bill No: SB 71
Author: | Wiener | ||
Version: | 3/13/2025 | Hearing Date: | 3/19/2025 |
Urgency: | No | Fiscal: | Yes |
Consultant: | Brynn Cook | ||
SUBJECT: California Environmental Quality Act: exemptions: transit projects
DIGEST: This bill removes the January 1, 2030 sunset on an existing CEQA exemption for various transportation projects and expands the exemption to include changes to transit routes and projects for alternatively fueled shuttles and ferries.
ANALYSIS:
Existing law:
- Under the California Environmental Quality Act (CEQA), a lead agency determines whether a project is exempt from CEQA, or if it must do an initial study to determine if a project will have significant effects on the environment. If a project has no effect on the environment or effects that can be mitigated, the lead agency prepares a negative declaration (ND) or mitigated ND (MND). If the project will have significant impacts, the lead agency prepares an environmental impact report (EIR) to evaluate and propose mitigation measures for any effects on the environment, including impacts or likely impacts to land, air, water, minerals, flora, fauna, ambient noise, and historic or aesthetic significance. (Public Resources Code (PRC) §§21000 et seq.)
- CEQA, until January 1, 2030, exempts from its requirements active transportation plans, pedestrian plans, or bicycle transportation plans for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles. (PRC § 21080.20)
- CEQA, until January 1, 2030, exempts certain transportation-related projects, including pedestrian and bicycle facilities, transit prioritization projects, public projects for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries, as provided. CEQA requires, except as provided, those exempted projects to be carried out by a local agency and meet certain requirements, including certain labor requirements (PRC § 21080.25).
- Requires that these exemptions, not including a project to reduce minimum parking requirements, meet the following criteria:
- Be carried out by a public agency and the public agency is the lead agency.
- Be located in an urbanized area.
- Be located on or within an existing public right-of-way.
- Does not add physical infrastructure that increases new automobile capacity on existing rights-of-way, except as provided.
- Does not require demolition of affordable housing units.
- Has a certification from the lead agency that the project will be completed by a skilled and trained workforce, except as provided.
- Requires that projects using this exemption and that exceed $100 million also meet the following criteria (PRC § 21080.25):
- Be incorporated in a regional transportation plan, sustainable communities’ strategy, general plan, or other plan that has undergone a programmatic-level environmental review within 10 years of the approval of the project.
- Fully mitigate construction impacts consistent with applicable law.
- Require the lead agency to complete and consider results of a project business case and a racial equity analysis, as specified.
- Require lead agency to hold noticed public hearings, as prescribed.
- Requires that projects using this exemption and that exceed $50 million also meet prescribed public notice and hearing requirements (PRC § 21080.25).
- Requires that these exemptions, not including a project to reduce minimum parking requirements, meet the following criteria:
This bill:
- Removes the sunset on the existing CEQA exemption for various active transportation projects established in PRC § 21080.20.
- Expands the exemption to include a transit comprehensive operational analysis, a transit route readjustment, or other transit agency route addition, elimination, or modification in this CEQA exemption.
- Defines “Transit comprehensive operational analysis” as a plan that redesigns or modifies a transit operator’s or local agency’s public transit service network, including the routing of fixed route and microtransit services.
- Expands the exemption to include a transit comprehensive operational analysis, a transit route readjustment, or other transit agency route addition, elimination, or modification in this CEQA exemption.
- Removes the sunset on the existing CEQA exemption for transportation projects identified in PRC 21080.25, which includes pedestrian and bicycle facilities, transit prioritization projects, public projects for the institution or increase of bus rapid transit, bus, or light rail service, including the construction or rehabilitation of stations, terminals, or existing operations facilities, and public projects for the construction or maintenance of infrastructure of facilities to charge, refuel, or maintain zero-emission public transit buses, trains, or ferries.
- Expands the exemption to include projects for zero, near-zero, natural gas, or low-NOx technology ferries and shuttles.
- Adjusts the way in which a project’s cost is assessed to determine if it costs more than $50,000,000 or $100,000,000 (which triggers certain requirements including holding public hearings). Specifically, the bill requires that the $50,000,000 and $100,000,000 threshold is based on the project engineer’s cost estimate, and requires that these cost thresholds should be adjusted to the California Consumer Price Index.
- Removes the requirement that projects costing more than $100,000,000 should set forth the business case as to why the project should be implemented, which includes an evaluation of other options to achieve the project’s objectives and a consideration of the costs and benefits of the project.
Background
- The A, B, C’s of CEQA. CEQA is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment. CEQA is enforced by civil lawsuits that can challenge any project’s environmental review.
Under CEQA, projects (unless they have a specific exemption) must undergo environmental analysis. This process starts with an initial study which determines what level of further environmental review is needed for a given project. If a project has no significant effects on the environment, or if those effects can be fully mitigated, the project can move forward with a negative declaration (ND) or mitigated negative declaration (MND). If the initial study finds that the project has potential significant effects on the environment, then a full EIR is conducted. An EIR provides thorough environmental review of a proposed project, analyzing the significant direct and indirect environmental impacts of a proposed project. The EIR also includes proposed mitigation measures for any significant effects that it identifies and considers alternatives to the proposed project.
- CEQA exemptions. A project is exempt from CEQA if it is ministerial (i.e., it does not involve discretionary decisions), or if there is a specific statutory or categorical exemption that applies to the project. Statutory exemptions are created by the Legislature and typically apply even if a project has the potential to significantly affect the environment. In contrast, categorical exemptions, which are listed in the CEQA guidelines, generally do not apply if there are significant environmental impacts associated with the project, including if (1) there is a reasonable possibility of a significant effect on the environment due to unusual circumstances; (2) significant cumulative impacts from projects of the same type will result; or (3) the project will have impacts on a uniquely sensitive environment.
- Transportation Exemptions in CEQA. The majority of transportation projects are exempt from CEQA. In October 2017, this committee conducted a survey of state agencies regarding CEQA to gain a better understanding of CEQA compliance and litigation. The survey covered a period of five years, Fiscal Years 2011/12 to 2015/16. The Department of Transportation (DOT) reported a total of 3,259 projects during the five-year period, and almost 90% of these projects were exempt from CEQA.
Since this survey was conducted, two Senate bills (SB 288, Wiener Chapter 200, Statutes of 202, and SB 922 Wiener, Chapter 987, Statutes of 2022) further expanded CEQA exemptions for certain clean and active transportation projects. Under the provision of these two bills, and another bill signed into law last year (AB 2503, Lee), the following transportation projects are exempt from CEQA until January 1, 2030:
- Pedestrian and bicycle facilities, including new facilities.
- Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians.
- Transit prioritization projects.
- Projects for the designation and conversion of general purpose lanes or highway shoulders to bus-only lanes.
- A public project for the institution or increase of new bus rapid transit (BRT), bus, or light rail service, including the construction of stations, as specified.
- A public project to construct or increase passenger rail service used for zero-emission trains.
- A public project to construct or maintain infrastructure to charge or refuel zero-emission transit buses, trains, or ferries, as specified.
- The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with one of these projects.
- A project carried out by a city or county to reduce minimum parking requirements.
Many of these exemptions are broad –to provide a backstop to ensure that only active and clean transportation projects are eligible for this CEQA exemption, the exemption also includes a guardrail that specifies projects are not eligible for this CEQA exemption if they induce single-occupancy vehicle trips, add additional highway lanes, or widen highways.
- Natural gas and low-NOx: bridges to Zero Emission transportation. California is charting a course toward zero-emission transportation. In 2020, Governor Newsom issued Executive Order (EO) N-79-20, which established a goal that 100% of medium and heavy-duty vehicles be zero-emission vehicles (ZEVs) by 2045. Supporting this goal are several programs at the California Air Resources Board (CARB), including the Advanced Clean Truck regulation that requires an increasing percentage of medium and heavy-duty (MHD) trucks sold to be ZEVs beginning in 2024.
As the state moves towards a zero-emission future, it has also relied on low-NOx and natural gas-powered vehicles to reduce air pollution in the short term. Natural gas and low-NOx technologies are a cleaner alternative to diesel-powered engines. Natural gas trucks emit significantly less particulate matter (PM) and nitrogen oxides (NOx) than diesel trucks, with reductions of up to 95% for PM and 90% for NOx. However, the greenhouse gas (GHG) emission reductions are far from those of zero-emission vehicles: according to one life-cycle analysis by Argonne National Laboratory, heavy-duty natural gas vehicles provide only small to moderate GHG reduction benefits compared to diesel throughout the fuel life cycle.[1]
Comments
- Purpose of Bill. According to the author, “Public Transportation is critical to California’s future. Streamlining climate-friendly sustainable transportation projects that improve public transportation and make our streets safer for pedestrians, bicyclists, and other vulnerable road users helps the state better deliver on its climate, housing, and social mobility goals. SB 71 makes a critical CEQA exemption - with environmental and other guardrails - for such projects that was first enacted with great success 5 years ago permanent, while slightly expanding and cleaning up the law. At a time where public transportation systems in California and across the nation face acute funding pressures and federal uncertainty, it is critical to enact this reform so that public transportation agencies and local agencies can continue to control capital costs and deliver projects without delay and associated cost increases from the bad-faith abuse of environmental laws. SB 71 will ensure that projects that help the state meet its climate goals, facilitate dense urban infill development, improve access to opportunity and mobility, and support high-quality construction jobs continue, and deliver on the promise of infrastructure investment.”
- “Environmental” projects can still have environmental impacts. Bike lanes, buses, zero emission trains and other “clean transportation” projects can reduce greenhouse gas and local air pollution emissions if they replace gas-powered vehicles. These types of projects can also improve quality of life in communities by increasing mobility options. However, even projects that have environmental and social benefits can come with environmental impacts. SB 71 includes a large suite of transportation projects, including projects that are likely to have small impacts if any (like adding lighting to bus stops), and projects that are likely to have significant environmental impacts, like infrastructure for hydrogen rail or ferry terminals. Under CEQA, impacts associated with those projects would have to be studied, and mitigated as feasible. Providing a CEQA exemption for these projects means that those impacts may go undisclosed to the communities they are located in, and any harmful impacts would go unmitigated.
- What is the track record for the SB 288/SB 922 exemption? Before removing the sunset on the CEQA exemptions in SB 288/SB 922, it is worth knowing if the exemption (1) has been useful in deploying projects (2) has resulted in environmental costs and/or benefits.
According to CEQAnet, the state’s database of filed CEQA documents, approximately 10 projects have used the PRC 21080.20 exemption, and over 100 projects have filed a notice of exemption for transportation projects under PRC Section 21080.25. In terms of speeding along deployment of clean and active transportation projects, the exemption has been a resounding success.
What have been the environmental effects of these projects? The benefits and impacts of these projects are varied as the projects themselves, and the potential for big impacts may scale with the potential for big benefits. Many of the projects that have applied for exemption, as provided on CEQAnet, include bike lanes, bus stops, pedestrian paths and other relatively small projects that are likely to have few harmful environmental impacts as they improve active transportation and ideally, reduce reliance on gas-powered single-occupancy vechiles that generate air and greenhouse gas emissions. However, the exemption also includes a number of large projects that are likely to have significant impacts on the environment, such as Metro’s Next Gen Bus Plan, which will implement “The design and construction of new bus-only lanes and other transit priority improvements along up to 80 lane miles on the highest frequency corridors in the city of Los Angeles.[2]”Another example of a potentially high-impact project was one in which a building was demolitioned in order to more easily stage the building of addtional bus bays and a metro deboarding platform in San Deigo. The notice of exemption for this project noted that the building to be demolished “contains asbestos and lead”. According to minutes of the meeting of the San Diego Metroplitan Transit System Board of Directors where the work order for the project was authorized and which determined that the poject was CEQA exempt, the space where the building was demolished was to be“converted to employee parking”. These projects are likely to increase bus and metro ridership, but it is also possible that they could have other, less desireable impacts. As the impacts of large-scale projects using this exemption are still unfolding, it is worth considering if completely removing the sunset could lead to an accumulation of harmful impacts over time. As the bill continues to move through the legislative process, the author may wish to consider if a sunset extension, rather than removing the sunset in perpetuity, could achieve the goals of advancing clean transportation projects while also ensuring some level of legislative oversight for projects as the environmental impacts of projects begin to be felt in the areas they are located.
- Natural gas and Low-NOx: bridge technologies or final destination? SB 71 proposes to remove the sunset on CEQA exemptions for projects that advance near zero, CNG and low-NOx buses, BRT, and microtransit, and expand the exemption to include shuttles and ferries using these technologies. However, California is charting a course to reach 100% zero-emission medium and heavy duty trucks by 2045. While low-NOx and other near-zero technologies are an important bridge to reduce localized air pollution as the state ramps up to its zero-emission goals, the State is already planning for their obsolescence. It is worth considering if these ‘bridge’ technologies should be included in future sunset exemptions.
The author and committee may wish to amend the bill to put a January 1, 2032 sunset on the CEQA exemption for projects supporting primarily near-zero technologies like CNG and low-Nox.
- Shuttles, ferries, transit routes oh my! SB 71 adds alternative fueled shuttles and ferries to the existing CEQA exemption for projects that build, improve, or increase bus, bus rapid transit, or bus, or light rail services. The terms “shuttles” and “ferries” are not currently defined in law. Without a definition, the CEQA exemption could be extended to privately owned shuttles—like water taxis or Uber and Lyft. The exemption applies only to public agency projects: however, public agencies could choose to build infrastructure for privately owned shuttles, like building uber and lyft lanes for pickups at airports. On it’s website, Lyft states that it “Works with local governments to improve access to transit, and to provide rides to and from transit stations.”[3] The bill specifically includes a provision that projects will not be eligible for the CEQA exemption if they induce single-occupancy vehicle trips: that might seem to rule out transportation network companies (TNCs), which frequently operate as SOV on the way to pickup a customer. However, it would be challenging for any entity to prove that TNCs are not HOV throughout their entire route, since TNCs always have the option to be HOV. The author and committee may wish to specify that the exemption only applies to projects that are not TNCs.
- CEQA in a changing Federal landscape. When projects have both a state and federal decision making component, they are subject to both CEQA and NEPA (CEQA provides environmental review for projects by California public agencies, while NEPA ensures that federal agencies consider the environmental impacts of decision they make). CEQA is not redundant with NEPA (notably, CEQA requires mitigation measures, which NEPA does not), but CEQA and NEPA can act in concert to ensure that there is robust environmental review baked into decision making.
On February 20, 2025, the White House Council on Environmental Quality (CEQ) posted a pre-publication notice on its website of an Interim Final Rule that rescinds its regulations implementing NEPA. CEQ has guided NEPA, which is in itself a sparse law, since 1978. CEQ simultaneously issued new guidance to federal agencies for revising their NEPA implementing procedures consistent with the NEPA statute and President Trump’s Executive Order 14,154 (Unleashing American Energy). The Interim Final Rule was submitted for publication in the Federal Register on February 19, 2025 and will become effective 45 days after it is published. According to the National Law Review, “This action represents the final blow to CEQ’s NEPA regulations.”
In a future where NEPA may play a severely reduced role in driving environmental review, the role of CEQA could be increasingly important to ensure that the environmental impacts of projects in California are known and mitigated whenever possible.
- Committee amendments. Staff recommends the committee adopt the bolded amendments contained in comment 4 & 5 above.
DOUBLE REFERRAL. If this measure is approved by the Senate Environmental Quality Committee, the do pass motion must include the action to re-refer the bill to the Senate Transportation Committee.
Related/Prior Legislation
AB 35 (Alvarez, 2025) would limit, until January 1, 2036, CEQA review for “clean hydrogen transportation projects”, require the lead agency to determine whether to approve a “clean hydrogen environmental assessment” used in lieu of CEQA documentation and issue a discretionary permit or authorization for the project no later than 270 days after the application for the project is deemed complete. The bill would further require any lawsuits against a “clean hydrogen transportation project”, including all appeals and as feasible be resolve within 270 days.
AB 2503 (Lee, Chapter 718, Statutes of 2024) expands existing California Environmental Quality Act (CEQA) exemptions for transit projects to include public project for the institution or increase of zero-emission passenger rail service within an existing rail or highway right-of-way.
SB 922 (Wiener, Chapter 987, Statutes of 2022) expands exemptions for specified transit, bicycle, and pedestrian and other transportation projects, and extends these exemptions from 2023 to 2030.
SOURCE:
SUPPORT:
Bay Area Council
Bike East Bay
California Bicycle Coalition
California Transit Association
City and County of San Francisco
Greenbelt Alliance
Kidsafe Sf
LA Metro
Metropolitan Transportation Commission
Monterey-salinas Transit (MST)
Move LA
Orange County Transportation Authority
Sacramento Regional Transit District
San Francisco Bicycle Coalition
San Francisco Chamber of Commerce
San Francisco Municipal Transportation Agency (SFMTA)
Seamless Bay Area
Spur
Walk San Francisco Foundation
OPPOSITION:
None Received.
-- END --
Discussed in Hearing
Senate Floor
Assembly Floor
Assembly Standing Committee on Natural Resources
Senate Floor
Senate Standing Committee on Appropriations
Senate Standing Committee on Transportation
Senate Standing Committee on Environmental Quality
Bill Author
Bill Co-Author(s):