SB 811: Hazardous materials: metal shredding facilities.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2026-09-30
Current Status:
Passed
(2026-09-30: Chaptered by Secretary of State. Chapter 982, Statutes of 2026.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law authorizes the Department of Toxic Substances Control (DTSC), in consultation with the Department of Resources Recycling and Recovery, the State Water Resources Control Board, and affected local air quality management districts, to adopt regulations to establish management standards for metal shredding facilities for hazardous waste management activities within the DTSCs jurisdiction, as provided. Existing law provides that treated metal shredder waste that is managed in accordance with those regulations is deemed to be solid waste, and not hazardous waste, as provided.
This bill would repeal those provisions. The bill would establish a comprehensive scheme for the regulation of metal shredding facilities that would be administered by the DTSC pursuant to authority separate from laws governing the control of hazardous waste. The bill would prohibit an owner or operator from operating a metal shredding facility, as defined, in the state unless they have a permit from the DTSC or are deemed to have a permit. The bill would prescribe the requirements for obtaining a permit, for being deemed to have a permit, for operating a metal shredding facility, and for transporting certain materials related to metal shredding, as specified. The bill would require, before a decision is made to approve or deny a permit application, the DTSC to hold a public meeting, as provided. The bill would require the DTSC to take final action on a permit application by an existing facility within 3 years, as provided. The bill would require the DTSC to post on its internet website general information about each metal shredding facility that has applied for or obtained a permit, and to conduct at least one site visit to the applicants facility after receipt of the permit application. The bill would provide that certain materials related to metal shredding are not hazardous waste if they meet specified requirements. The bill would require any report required to be submitted by a metal shredding facility pursuant to a permit issued to be signed by the owner or operator and certified under penalty of law, including criminal penalties, as specified. The bill would require the DTSC to have primary responsibility for enforcing these provisions, would require the DTSC to conduct an annual compliance evaluation inspection of each metal shredding facility, and would authorize the DTSC to refer violations to a district attorney or the Attorney General for prosecution. The bill would also require the DTSC to inform the local health officer and the director of environmental health of a county, city, or district within 15 days after the DTSC becomes aware of any unlawful disposal of materials, as provided, and of any enforcement action against a metal shredding facility as a result of that unlawful disposal. Because the bill would expand the scope of a crime, the bill would impose a state-mandated local program. The bill would require an owner or operator of a metal shredding facility to report to the DTSC certain emergency situations, as specified. The bill would require an owner or operator of a metal shredding facility to submit to the DTSC a closure plan and a cost estimate for closing the metal shredding facility, as specified. The bill would also require the owner or operator of a metal shredding facility to provide written notice to the DTSC at least 60 days before transferring ownership or operation of the facility. The bill would authorize the DTSC to enforce these provisions by revoking permits and by other specified means. The bill would authorize the DTSC to adopt regulations for the operation of metal shredding facilities as necessary to implement the requirements of the bill. The bill would require the DTSC to post information provided by owners and operators regarding a metal shredding facility on the DTSCs internet website in a manner that is readily accessible to the public, except as otherwise required pursuant to existing law.
Existing law authorizes the DTSC to collect an annual fee from all metal shredding facilities subject to the requirements of hazardous waste control laws or the DTSCs management standards for metal shredding facilities, as provided. Existing law requires the DTSC to adopt regulations necessary to administer the fee and authorizes the DTSC to adopt those regulations using emergency procedures, as provided. Existing law requires the Controller to establish a separate subaccount in the Hazardous Waste Control Account and for all fees collected to be placed into that subaccount, to be available for expenditure by the DTSC upon appropriation by the Legislature.
This bill would make the requirement to collect an annual fee inoperative on July 1, 2027, and would repeal it as of January 1, 2028.
This bill would instead require the DTSC to impose an annual fee on all metal shredding facilities subject to the provisions of the bill, as specified. The bill would require, beginning in the 202728 fiscal year, the rates established by the DTSC to be reviewed and increased or decreased annually, as provided. The bill would require the DTSC to adopt regulations necessary to administer the fee and would authorize the DTSC to adopt the regulations using emergency procedures, as specified. The bill would require a person who applies for a metal shredding facility permit to enter into a written agreement with the DTSC pursuant to which that person would be required to reimburse the DTSC for the direct costs reasonably incurred by the DTSC in processing the application, as provided. The bill would require the Controller to establish a new and separate Metal Shredding Facility Subaccount to be administered by the Director of Toxic Substances Control and would require all fees collected to be placed into that subaccount and made available for expenditure by the DTSC solely for the purpose of implementation and administration of these provisions, upon appropriation by the Legislature.
Existing law establishes the Board of Environmental Safety in the Department of Toxic Substances Control with specified duties.
This bill would require, on or before July 1, 2030, the Board of Environmental Safety, at a specially scheduled public meeting, to hear from the DTSC and receive input from the public, metal shredding facilities, and other stakeholders about the implementation of the bill, as provided. The bill would require the fees established pursuant to the bill to be sufficient to cover the reasonable costs incurred by the Board of Environmental Safety in administering and implementing its duties and responsibilities established by the bill.
Existing law requires the DTSC to require metal shredding facilities to monitor hazardous waste constituents requested by the DTSC and to report the results of that monitoring to the DTSC. Existing law also requires the DTSC to collect and analyze light fibrous material at the fence lines to determine the potential for release of hazardous waste. Existing law requires, on or before July 1, 2027, the DTSC to develop a procedure for community notification of the public for the area in which the metal shredding facility is located if that monitoring indicates any release of light fibrous material. In addition, existing law requires, on or before January 1, 2027, an air pollution control district or an air quality management district the jurisdiction of which includes metal shredding facilities, in consultation with the DTSC and the Office of Environmental Health Hazard Assessment (OEHHA), to develop requirements for facilitywide fence-line air quality monitoring at metal shredding facilities. Existing law authorizes any reasonable regulatory costs incurred by the DTSC in implementing, and requires that the OEHHAs costs to implement, the above-described duties be reimbursed from a subaccount established in the Hazardous Waste Control Account for the deposit of fees from metal shredding facilities.
This bill would limit the scope of those provisions to metal shredding facilities that are subject to the other provisions of the bill and would provide for the reimbursement of those costs from the Metal Shredding Facility Subaccount.
Existing law establishes in the General Fund the Toxic Substances Control Account for specified purposes, including the removal or remediation of toxic substances.
This bill would require the DTSC to deposit all penalties collected pursuant to the provisions of the bill into the Toxic Substances Control Account.
The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes the Department of Toxic Substances Control (DTSC), in consultation with the Department of Resources Recycling and Recovery, the State Water Resources Control Board, and affected local air quality management districts, to adopt regulations to establish management standards for metal shredding facilities for hazardous waste management activities within the DTSCs jurisdiction, as provided. Existing law provides that treated metal shredder waste that is managed in accordance with those regulations is deemed to be solid waste, and not hazardous waste, as provided.
This bill would repeal those provisions. The bill would establish a comprehensive scheme for the regulation of metal shredding facilities that would be administered by the DTSC pursuant to authority separate from laws governing the control of hazardous waste. The bill would prohibit an owner or operator from operating a metal shredding facility, as defined, in the state unless they have a permit from the DTSC or are deemed to have a permit. The bill would prescribe the requirements for obtaining a permit, for being deemed to have a permit, for operating a metal shredding facility, and for transporting certain materials related to metal shredding, as specified. The bill would require, before a decision is made to approve or deny a permit application, the DTSC to hold a public meeting, as provided. The bill would require the DTSC to take final action on a permit application by an existing facility within 3 years, as provided. The bill would require the DTSC to post on its internet website general information about each metal shredding facility that has applied for or obtained a permit, and to conduct at least one site visit to the applicants facility after receipt of the permit application. The bill would provide that certain materials related to metal shredding are not hazardous waste if they meet specified requirements. The bill would require any report required to be submitted by a metal shredding facility pursuant to a permit issued to be signed by the owner or operator and certified under penalty of law, including criminal penalties, as specified. The bill would require the DTSC to have primary responsibility for enforcing these provisions, would require the DTSC to conduct an annual compliance evaluation inspection of each metal shredding facility, and would authorize the DTSC to refer violations to a district attorney or the Attorney General for prosecution. The bill would also require the DTSC to inform the local health officer and the director of environmental health of a county, city, or district within 15 days after the DTSC becomes aware of any unlawful disposal of materials, as provided, and of any enforcement action against a metal shredding facility as a result of that unlawful disposal. Because the bill would expand the scope of a crime, the bill would impose a state-mandated local program. The bill would require an owner or operator of a metal shredding facility to report to the DTSC certain emergency situations, as specified. The bill would require an owner or operator of a metal shredding facility to submit to the DTSC a closure plan and a cost estimate for closing the metal shredding facility, as specified. The bill would also require the owner or operator of a metal shredding facility to provide written notice to the DTSC at least 60 days before transferring ownership or operation of the facility. The bill would authorize the DTSC to enforce these provisions by revoking permits and by other specified means. The bill would authorize the DTSC to adopt regulations for the operation of metal shredding facilities as necessary to implement the requirements of the bill. The bill would require the DTSC to post information provided by owners and operators regarding a metal shredding facility on the DTSCs internet website in a manner that is readily accessible to the public, except as otherwise required pursuant to existing law.
Existing law authorizes the DTSC to collect an annual fee from all metal shredding facilities subject to the requirements of hazardous waste control laws or the DTSCs management standards for metal shredding facilities, as provided. Existing law requires the DTSC to adopt regulations necessary to administer the fee and authorizes the DTSC to adopt those regulations using emergency procedures, as provided. Existing law requires the Controller to establish a separate subaccount in the Hazardous Waste Control Account and for all fees collected to be placed into that subaccount, to be available for expenditure by the DTSC upon appropriation by the Legislature.
This bill would make the requirement to collect an annual fee inoperative on July 1, 2027, and would repeal it as of January 1, 2028.
This bill would instead require the DTSC to impose an annual fee on all metal shredding facilities subject to the provisions of the bill, as specified. The bill would require, beginning in the 202728 fiscal year, the rates established by the DTSC to be reviewed and increased or decreased annually, as provided. The bill would require the DTSC to adopt regulations necessary to administer the fee and would authorize the DTSC to adopt the regulations using emergency procedures, as specified. The bill would require a person who applies for a metal shredding facility permit to enter into a written agreement with the DTSC pursuant to which that person would be required to reimburse the DTSC for the direct costs reasonably incurred by the DTSC in processing the application, as provided. The bill would require the Controller to establish a new and separate Metal Shredding Facility Subaccount to be administered by the Director of Toxic Substances Control and would require all fees collected to be placed into that subaccount and made available for expenditure by the DTSC solely for the purpose of implementation and administration of these provisions, upon appropriation by the Legislature.
Existing law establishes the Board of Environmental Safety in the Department of Toxic Substances Control with specified duties.
This bill would require, on or before July 1, 2030, the Board of Environmental Safety, at a specially scheduled public meeting, to hear from the DTSC and receive input from the public, metal shredding facilities, and other stakeholders about the implementation of the bill, as provided. The bill would require the fees established pursuant to the bill to be sufficient to cover the reasonable costs incurred by the Board of Environmental Safety in administering and implementing its duties and responsibilities established by the bill.
Existing law requires the DTSC to require metal shredding facilities to monitor hazardous waste constituents requested by the DTSC and to report the results of that monitoring to the DTSC. Existing law also requires the DTSC to collect and analyze light fibrous material at the fence lines to determine the potential for release of hazardous waste. Existing law requires, on or before July 1, 2027, the DTSC to develop a procedure for community notification of the public for the area in which the metal shredding facility is located if that monitoring indicates any release of light fibrous material. In addition, existing law requires, on or before January 1, 2027, an air pollution control district or an air quality management district the jurisdiction of which includes metal shredding facilities, in consultation with the DTSC and the Office of Environmental Health Hazard Assessment (OEHHA), to develop requirements for facilitywide fence-line air quality monitoring at metal shredding facilities. Existing law authorizes any reasonable regulatory costs incurred by the DTSC in implementing, and requires that the OEHHAs costs to implement, the above-described duties be reimbursed from a subaccount established in the Hazardous Waste Control Account for the deposit of fees from metal shredding facilities.
This bill would limit the scope of those provisions to metal shredding facilities that are subject to the other provisions of the bill and would provide for the reimbursement of those costs from the Metal Shredding Facility Subaccount.
Existing law establishes in the General Fund the Toxic Substances Control Account for specified purposes, including the removal or remediation of toxic substances.
This bill would require the DTSC to deposit all penalties collected pursuant to the provisions of the bill into the Toxic Substances Control Account.
The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes the Department of Toxic Substances Control (DTSC), in consultation with the Department of Resources Recycling and Recovery, the State Water Resources Control Board, and affected local air quality management districts, to adopt regulations to establish management standards for metal shredding facilities for hazardous waste management activities within the DTSCs jurisdiction, as provided. Existing law provides that treated metal shredder waste that is managed in accordance with those regulations is deemed to be solid waste, and not hazardous waste, as provided.
This bill would repeal those provisions. The bill would establish a comprehensive scheme for the regulation of metal shredding facilities that would be administered by the DTSC pursuant to authority separate from laws governing the control of hazardous waste. The bill would prohibit an owner or operator from operating a metal shredding facility, as defined, in the state unless they have a permit from the DTSC or are deemed to have a permit. The bill would prescribe the requirements for obtaining a permit, for being deemed to have a permit, for operating a metal shredding facility, and for transporting certain materials related to metal shredding, as specified. The bill would require, before a decision is made to approve or deny the a permit application, the DTSC to hold a public meeting, as provided. The bill would require the department DTSC to take final action on a permit application by an existing facility within 3 years, as provided. The bill would require the department DTSC to post on its internet website general information about each metal shredding facility that has applied for or obtained a permit, and to conduct at least one site visit to the applicants facility after receipt of the permit application. The bill would provide that certain materials related to metal shredding are not hazardous waste if they meet specified requirements. The bill would require any report required to be submitted by a metal shredding facility pursuant to a permit issued to be signed by the owner or operator and certified under penalty of law, including criminal penalties, as specified. The bill would require the DTSC to have primary responsibility for enforcing these provisions, would require the DTSC to conduct an annual compliance evaluation inspection of each metal shredding facility, and would authorize the DTSC to refer violations to a district attorney or the Attorney General for prosecution. The bill would also require the DTSC to inform the local health officer and the director of environmental health of a county, city, or district within 15 days after the DTSC becomes aware of any unlawful disposal of materials, as provided, and of any enforcement action against a metal shredding facility as a result of that unlawful disposal. Because the bill would expand the scope of a crime, the bill would impose a state-mandated local program. The bill would require an owner or operator of a metal shredding facility to report to the DTSC certain emergency situations, as specified. The bill would require an owner or operator of a metal shredding facility to submit to the DTSC a closure plan and a cost estimate for closing the metal shredding facility, as specified. The bill would also require the owner or operator of a metal shredding facility to provide written notice to the department DTSC at least 60 days before transferring ownership or operation of the facility. The bill would authorize the DTSC to enforce these provisions by revoking permits and by other specified means. The bill would authorize the DTSC to adopt regulations for the operation of metal shredding facilities as necessary to implement the requirements of the bill. The bill would require the DTSC to post information provided by owners and operators regarding a metal shredding facility on the departments DTSCs internet website in a manner that is readily accessible to the public, except as otherwise required pursuant to existing law.
Existing law authorizes the DTSC to collect an annual fee from all metal shredding facilities subject to the requirements of hazardous waste control laws or the DTSCs management standards for metal shredding facilities, as provided. Existing law requires the DTSC to adopt regulations necessary to administer the fee and authorizes the DTSC to adopt those regulations using emergency procedures, as provided. Existing law requires the Controller to establish a separate subaccount in the Hazardous Waste Control Account and for all fees collected to be placed into that subaccount, to be available for expenditure by the DTSC upon appropriation by the Legislature.
This bill would make the requirement to collect an annual fee inoperative on July 1, 2027, and would repeal it as of January 1, 2028.
This bill would instead require the DTSC to impose an annual fee on all metal shredding facilities subject to the provisions of this the bill, as specified. The bill would require, beginning in the 202728 fiscal year, the rates established by the DTSC to be reviewed and increased or decreased annually, as provided. The bill would require the DTSC to adopt regulations necessary to administer the fee and would authorize the DTSC to adopt the regulations using emergency procedures, as specified. The bill would require a person who applies for a metal shredding facility permit to enter into a written agreement with the department DTSC pursuant to which that person would be required to reimburse the department DTSC for the direct costs reasonably incurred by the department DTSC in processing the application, as provided. The bill would require the Controller to establish a new and separate Metal Shredding Facility subaccount Subaccount to be administered by the Director of Toxic Substances Control and would require all fees collected to be placed into that subaccount and made available for expenditure by the DTSC solely for the purpose of implementation and administration of these provisions, upon appropriation by the Legislature.
Existing law establishes the Board of Environmental Safety in the Department of Toxic Substances Control with specified duties.
This bill would require, on or before July 1, 2030, the Board of Environmental Safety, at a specially scheduled public meeting, to hear from the DTSC and receive input from the public, metal shredding facilities, and other stakeholders about the implementation of the provisions of the bill, as provided. The bill would require the fees established pursuant to the bill to be sufficient to cover the reasonable costs incurred by the Board of Environmental Safety in administering and implementing its duties and responsibilities established by the bill.
Existing law requires the DTSC to require metal shredding facilities to monitor hazardous waste constituents requested by the DTSC and to report the results of that monitoring to the DTSC. Existing law also requires the DTSC to collect and analyze light fibrous material at the fence lines to determine the potential for release of hazardous waste. Existing law requires, on or before July 1, 2027, the DTSC to develop a procedure for community notification of the public for the area in which the metal shredding facility is located if that monitoring indicates any release of light fibrous material. In addition, existing law requires, on or before January 1, 2027, an air pollution control district or an air quality management district the jurisdiction of which includes metal shredding facilities, in consultation with the DTSC and the Office of Environmental Health Hazard Assessment (OEHHA), to develop requirements for facilitywide fence-line air quality monitoring at metal shredding facilities. Existing law authorizes any reasonable regulatory costs incurred by the DTSC in implementing, and requires that the OEHHAs costs to implement, the above-described duties be reimbursed from a subaccount established in the Hazardous Waste Control Account for the deposit of fees from metal shredding facilities.
This bill would limit the scope of those provisions to metal shredding facilities that are subject to the other provisions of the bill and would provide for the reimbursement of those costs from the Metal Shredding Facility Subaccount.
Existing law establishes in the General Fund the Toxic Substances Control Account for specified purposes, including the removal or remediation of toxic substances.
This bill would require the DTSC to deposit all penalties collected pursuant to the provisions of the bill into the Toxic Substances Control Account.
The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes the Department of Toxic Substances Control (DTSC), in consultation with the Department of Resources Recycling and Recovery, the State Water Resources Control Board, and affected local air quality management districts, to adopt regulations to establish management standards for metal shredding facilities for hazardous waste management activities within the DTSCs jurisdiction, as provided. Existing law provides that treated metal shredder waste that is managed in accordance with those regulations is deemed to be solid waste, and not hazardous waste, as provided.
This bill would repeal those provisions. The bill would establish a comprehensive scheme for the regulation of metal shredding facilities that would be administered by the DTSC pursuant to authority separate from laws governing the control of hazardous waste. The bill would prohibit an owner or operator from operating a metal shredding facility, as defined, in the state unless they have a permit from the DTSC or are deemed to have a permit. The bill would prescribe the requirements for obtaining a permit, for being deemed to have a permit, for operating a metal shredding facility, and for transporting certain materials related to metal shredding, as specified. The bill would require, before a decision is made to approve or deny the application, the DTSC to hold a public meeting, as provided. The bill would require the department to take final action on a permit application by an existing facility within 3 years, as provided. The bill would require the department to post on its internet website general information about each metal shredding facility that has applied for or obtained a permit, and to conduct at least one site visit to the applicants facility after receipt of the permit application. The bill would provide that certain materials related to metal shredding are not hazardous waste if they meet specified requirements. The bill would require any report required to be submitted by a metal shredding facility pursuant to a permit issued to be signed by the owner or operator and certified under penalty of law, including criminal penalties, as specified. The bill would require the DTSC to have primary responsibility for enforcing these provisions, would require the DTSC to conduct an annual compliance evaluation inspection of each metal shredding facility, and would authorize the DTSC to refer violations to a district attorney or the Attorney General for prosecution. The bill would also require the DTSC to inform the local health officer and the director of environmental health of a county, city, or district within 15 days after the DTSC becomes aware of any unlawful disposal of materials, as provided, and of any enforcement action against a metal shredding facility as a result of that unlawful disposal. Because the bill would expand the scope of a crime, the bill would impose a state-mandated local program. The bill would require an owner or operator of a metal shredding facility to report to the DTSC certain emergency situations, as specified. The bill would require an owner or operator of a metal shredding facility to submit to the DTSC a closure plan and a cost estimate for closing the metal shredding facility, as specified. The bill would also require the owner or operator of a metal shredding facility to provide written notice to the department at least 60 days before transferring ownership or operation of the facility. The bill would authorize the DTSC to enforce these provisions by revoking permits and by other specified means. The bill would authorize the DTSC to adopt regulations for the operation of metal shredding facilities as necessary to implement the requirements of the bill. The bill would require the DTSC to post information provided by owners and operators regarding a metal shredding facility on the departments internet website in a manner that is readily accessible to the public, except as otherwise required pursuant to existing law.
Existing law authorizes the DTSC to collect an annual fee from all metal shredding facilities subject to the requirements of hazardous waste control laws or the DTSCs management standards for metal shredding facilities, as provided. Existing law requires the DTSC to adopt regulations necessary to administer the fee and authorizes the DTSC to adopt those regulations using emergency procedures, as provided. Existing law requires the Controller to establish a separate subaccount in the Hazardous Waste Control Account and for all fees collected to be placed into that subaccount, to be available for expenditure by the DTSC upon appropriation by the Legislature.
This bill would instead require the DTSC to impose an annual fee on all metal shredding facilities subject to the provisions of this bill, as specified. The bill would require, beginning in the 202728 fiscal year, the rates established by the DTSC to be reviewed and increased or decreased annually, as provided. The bill would require the DTSC to adopt regulations necessary to administer the fee and would authorize the DTSC to adopt the regulations using emergency procedures, as specified. The bill would require a person who applies for a metal shredding facility permit to enter into a written agreement with the department pursuant to which that person would be required to reimburse the department for the direct costs reasonably incurred by the department in processing the application, as provided. The bill would require the Controller to establish a new and separate Metal Shredding Facility subaccount to be administered by the Director of Toxic Substances Control and would require all fees collected to be placed into that subaccount and made available for expenditure by the DTSC solely for the purpose of implementation and administration of these provisions, upon appropriation by the Legislature.
Existing law establishes the Board of Environmental Safety in the Department of Toxic Substances Control with specified duties.
This bill would require, on or before July 1, 2030, the Board of Environmental Safety, at a specially scheduled public meeting, to hear from the DTSC and receive input from the public, metal shredding facilities, and other stakeholders about the implementation of the provisions of the bill, as provided.
Existing law requires the DTSC to require metal shredding facilities to monitor hazardous waste constituents requested by the DTSC and to report the results of that monitoring to the DTSC. Existing law also requires the DTSC to collect and analyze light fibrous material at the fence lines to determine the potential for release of hazardous waste. Existing law requires, on or before July 1, 2027, the DTSC to develop a procedure for community notification of the public for the area in which the metal shredding facility is located if that monitoring indicates any release of light fibrous material. In addition, existing law requires, on or before January 1, 2027, an air pollution control district or an air quality management district the jurisdiction of which includes metal shredding facilities, in consultation with the DTSC and the Office of Environmental Health Hazard Assessment (OEHHA), to develop requirements for facilitywide fence-line air quality monitoring at metal shredding facilities. Existing law authorizes any reasonable regulatory costs incurred by the DTSC in implementing, and requires that the OEHHAs costs to implement, the above-described duties be reimbursed from a subaccount established in the Hazardous Waste Control Account for the deposit of fees from metal shredding facilities.
This bill would limit the scope of those provisions to metal shredding facilities that are subject to the other provisions of the bill and would provide for the reimbursement of those costs from the Metal Shredding Facility Subaccount.
The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes the Department of Toxic Substances Control (DTSC), in consultation with the Department of Resources Recycling and Recovery, the State Water Resources Control Board, and affected local air quality management districts, to adopt regulations to establish management standards for metal shredding facilities for hazardous waste management activities within the DTSCs jurisdiction, as provided. Existing law provides that treated metal shredder waste that is managed in accordance with those regulations is deemed to be solid waste, and not hazardous waste, as provided.
This bill would repeal those provisions. The bill would establish a comprehensive scheme for the regulation of metal shredding facilities that would be administered by the DTSC pursuant to authority separate from laws governing the control of hazardous waste. The bill would prohibit an owner or operator from operating a metal shredding facility, as defined, in the state unless they have a permit from the DTSC or are deemed to have a permit. The bill would prescribe the requirements for obtaining a permit, for being deemed to have a permit, for operating a metal shredding facility, and for transporting certain materials related to metal shredding, as specified. The bill would require, before a decision is made to approve or deny the application, the DTSC to hold a public meeting, as provided. The bill would require the department to take final action on a permit application by an existing facility within 3 years, as provided. The bill would require the department to post on its internet website general information about each metal shredding facility that has applied for or obtained a permit, and to conduct at least one site visit to the applicants facility after receipt of the permit application. The bill would provide that certain materials related to metal shredding are not hazardous waste if they meet specified requirements. The bill would require any report required to be submitted by a metal shredding facility pursuant to a permit issued to be signed by the owner or operator and certified under penalty of law, including criminal penalties, as specified. The bill would require the DTSC to have primary responsibility for enforcing these provisions, would require the DTSC to conduct an annual compliance evaluation inspection of each metal shredding facility, and would authorize the DTSC to refer violations to a district attorney or the Attorney General for prosecution. The bill would also require the DTSC to inform the local health officer and the director of environmental health of a county, city, or district within 15 days after the DTSC becomes aware of any unlawful disposal of materials, as provided, and of any enforcement action against a metal shredding facility as a result of that unlawful disposal. Because the bill would expand the scope of a crime, the bill would impose a state-mandated local program. The bill would require an owner or operator of a metal shredding facility to report to the DTSC certain emergency situations, as specified. The bill would require an owner or operator of a metal shredding facility to submit to the DTSC a closure plan and a cost estimate for closing the metal shredding facility, as specified. The bill would also require the owner or operator of a metal shredding facility to provide written notice to the department at least 60 days before transferring ownership or operation of the facility. The bill would authorize the DTSC to enforce these provisions by revoking permits and by other specified means. The bill would authorize the DTSC to adopt regulations for the operation of metal shredding facilities as necessary to implement the requirements of the bill. The bill would require the DTSC to post information provided by owners and operators regarding a metal shredding facility on the departments internet website in a manner that is readily accessible to the public, except as otherwise required pursuant to existing law.
Existing law authorizes the DTSC to collect an annual fee from all metal shredding facilities subject to the requirements of hazardous waste control laws or the DTSCs management standards for metal shredding facilities, as provided. Existing law requires the DTSC to adopt regulations necessary to administer the fee and authorizes the DTSC to adopt those regulations using emergency procedures, as provided. Existing law requires the Controller to establish a separate subaccount in the Hazardous Waste Control Account and for all fees collected to be placed into that subaccount, to be available for expenditure by the DTSC upon appropriation by the Legislature.
This bill would instead require the DTSC to impose an annual fee on all metal shredding facilities subject to the provisions of this bill, as specified. The bill would require, beginning in the 202728 fiscal year, the rates established by the DTSC to be reviewed and increased or decreased annually, as provided. The bill would require the DTSC to adopt regulations necessary to administer the fee and would authorize the DTSC to adopt the regulations using emergency procedures, as specified. The bill would require a person who applies for a metal shredding facility permit to enter into a written agreement with the department pursuant to which that person would be required to reimburse the department for the direct costs reasonably incurred by the department in processing the application, as provided. The bill would require the Controller to establish a new and separate Metal Shredding Facility subaccount to be administered by the Director of Toxic Substances Control and would require all fees collected to be placed into that subaccount and made available for expenditure by the DTSC solely for the purpose of implementation and administration of these provisions, upon appropriation by the Legislature.
Existing law requires the DTSC to require metal shredding facilities to monitor hazardous waste constituents requested by the DTSC and to report the results of that monitoring to the DTSC. Existing law also requires the DTSC to collect and analyze light fibrous material at the fence lines to determine the potential for release of hazardous waste. Existing law requires, on or before July 1, 2027, the DTSC to develop a procedure for community notification of the public for the area in which the metal shredding facility is located if that monitoring indicates any release of light fibrous material. In addition, existing law requires, on or before January 1, 2027, an air pollution control district or an air quality management district the jurisdiction of which includes metal shredding facilities, in consultation with the DTSC and the Office of Environmental Health Hazard Assessment (OEHHA), to develop requirements for facilitywide fence-line air quality monitoring at metal shredding facilities. Existing law authorizes any reasonable regulatory costs incurred by the DTSC in implementing, and requires that the OEHHAs costs to implement, the above-described duties be reimbursed from a subaccount established in the Hazardous Waste Control Account for the deposit of fees from metal shredding facilities.
This bill would limit the scope of those provisions to metal shredding facilities that are subject to the other provisions of the bill and would provide for the reimbursement of those costs from the Metal Shredding Facility Subaccount.
The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes the Department of Toxic Substances Control (DTSC), in consultation with the Department of Resources Recycling and Recovery, the State Water Resources Control Board, and affected local air quality management districts, to adopt regulations to establish management standards for metal shredding facilities for hazardous waste management activities within the DTSCs jurisdiction, as provided. Existing law provides that treated metal shredder waste that is managed in accordance with those regulations is deemed to be solid waste, and not hazardous waste, as provided.
This bill would repeal those provisions. The bill would establish a comprehensive scheme for the regulation of metal shredding facilities that would be administered by the DTSC pursuant to authority separate from laws governing the control of hazardous waste. The bill would prohibit an owner or operator from operating a metal shredding facility, as defined, in the state unless they have a permit from the DTSC or are deemed to have a permit. The bill would prescribe the requirements for obtaining a permit, for being deemed to have a permit, for operating a metal shredding facility, and for transporting certain materials related to metal shredding, as specified. The bill would require, before a decision is made to approve or deny the application, the DTSC to hold a public meeting, as provided. The bill would require the department to take final action on a permit application by an existing facility within 3 years, as provided. The bill would require the department to post on its internet website general information about each metal shredding facility that has applied for or obtained a permit, and to conduct at least one site visit to the applicants facility after receipt of the permit application. The bill would provide that certain materials related to metal shredding are not hazardous waste if they meet specified requirements. The bill would require any report required to be submitted by a metal shredding facility pursuant to a permit issued to be signed by the owner or operator and certified under penalty of law, including criminal penalties, as specified. The bill would require the DTSC to have primary responsibility for enforcing these provisions, would require the DTSC to conduct an annual compliance evaluation inspection of each metal shredding facility, and would authorize the DTSC to refer violations to a district attorney or the Attorney General for prosecution. The bill would also require the DTSC to inform the local health officer and the director of environmental health of a county, city, or district within 15 days after the DTSC becomes aware of any unlawful disposal of materials, as provided, and of any enforcement action against a metal shredding facility as a result of that unlawful disposal. Because the bill would expand the scope of a crime, the bill would impose a state-mandated local program. The bill would require an owner or operator of a metal shredding facility to report to the DTSC certain emergency situations, as specified. The bill would require an owner or operator of a metal shredding facility to submit to the DTSC a closure plan and a cost estimate for closing the metal shredding facility, as specified. The bill would also require the owner or operator of a metal shredding facility to provide written notice to the department at least 60 days before transferring ownership or operation of the facility. The bill would authorize the DTSC to enforce these provisions by revoking permits and by other specified means. The bill would authorize the DTSC to adopt regulations for the operation of metal shredding facilities as necessary to implement the requirements of the bill. The bill would require the DTSC to post information provided by owners and operators regarding a metal shredding facility on the departments internet website in a manner that is readily accessible to the public, except as otherwise required pursuant to existing law.
Existing law authorizes the DTSC to collect an annual fee from all metal shredding facilities subject to the requirements of hazardous waste control laws or the DTSCs management standards for metal shredding facilities, as provided. Existing law requires the DTSC to adopt regulations necessary to administer the fee and authorizes the DTSC to adopt those regulations using emergency procedures, as provided. Existing law requires the Controller to establish a separate subaccount in the Hazardous Waste Control Account and for all fees collected to be placed into that subaccount, to be available for expenditure by the DTSC upon appropriation by the Legislature.
This bill would instead require the DTSC to impose an annual fee on all metal shredding facilities subject to the provisions of this bill, as specified. The bill would require, beginning in the 202728 fiscal year, the rates established by the DTSC to be reviewed and increased or decreased annually, as provided. The bill would require the DTSC to adopt regulations necessary to administer the fee and would authorize the DTSC to adopt the regulations using emergency procedures, as specified. The bill would require a person who applies for a metal shredding facility permit to enter into a written agreement with the department pursuant to which that person would be required to reimburse the department for the direct costs reasonably incurred by the department in processing the application, as provided. The bill would require the Controller to establish a new and separate Metal Shredding Facility subaccount to be administered by the Director of Toxic Substances Control and would require all fees collected to be placed into that subaccount and made available for expenditure by the DTSC solely for the purpose of implementation and administration of these provisions, upon appropriation by the Legislature.
Existing law requires the DTSC to require metal shredding facilities to monitor hazardous waste constituents requested by the DTSC and to report the results of that monitoring to the DTSC. Existing law also requires the DTSC to collect and analyze light fibrous material at the fence lines to determine the potential for release of hazardous waste. Existing law requires, on or before July 1, 2027, the DTSC to develop a procedure for community notification of the public for the area in which the metal shredding facility is located if that monitoring indicates any release of light fibrous material. In addition, existing law requires, on or before January 1, 2027, an air pollution control district or an air quality management district the jurisdiction of which includes metal shredding facilities, in consultation with the DTSC and the Office of Environmental Health Hazard Assessment (OEHHA), to develop requirements for facilitywide fence-line air quality monitoring at metal shredding facilities. Existing law authorizes any reasonable regulatory costs incurred by the DTSC in implementing, and requires that the OEHHAs costs to implement, the above-described duties be reimbursed from a subaccount established in the Hazardous Waste Control Account for the deposit of fees from metal shredding facilities.
This bill would limit the scope of those provisions to metal shredding facilities that are subject to the other provisions of the bill and would provide for the reimbursement of those costs from the Metal Shredding Facility Subaccount.
The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, the Davis-Stirling Common Interest Development Act, governs the management and operation of common interest developments, and requires an association to manage a common interest development. Existing law makes delivery of a document pursuant to those provisions complete upon either its deposit into the United States mail or upon electronic transmission.This bill would make a nonsubstantive change to those provisions.Existing law, the Davis-Stirling Common Interest Development Act, governs the management and operation of common interest developments, and requires an association to manage a common interest development. Existing law makes delivery of a document pursuant to those provisions complete upon either its deposit into the United States mail or upon electronic transmission.
This bill would make a nonsubstantive change to those provisions.
(a)The Legislature finds and declares all of the following:
(1)Metal shredding facilities are essential to a thriving circular economy in the State of California because they provide an efficient, reliable, and effective means of recycling the millions of tons of recyclable metal, including end-of-life vehicles and household appliances, that are generated annually in the state.
(2)Metal shredding facilities enable the recycling of end-of-life metal products and other metal-containing materials by reducing them in size and facilitating the recovery of ferrous and nonferrous metals and other recyclable commodities. These activities conserve energy and natural resources and support the states goal of reducing the emissions of greenhouse gases and combating climate change.
(3)Metal shredding facilities differ in important respects from waste management facilities. For this reason, regulation and oversight of metal shredding facilities are most appropriately addressed through requirements that are specific to the metal shredding industry, and to individual facilities based on their size and nature of operations, while fully protecting human health and the environment.
(4)The purpose of this chapter is to establish operating standards and other requirements applicable to metal shredding facilities and to resolve ongoing legal disputes over the regulatory status of metal shredding facilities that operate in the state. The department, the metal shredding industry, and neighboring communities would all benefit from clear, enforceable requirements to govern oversight of metal shredding facilities and their operations and to proactively protect public health and the environment.
(5)Metal shredding operations have the potential to release hazardous materials and impact neighboring communities and the environment if the materials are not properly managed.
(6)This chapter does not alter or override the authority of any other federal, state, or local agency with jurisdiction to regulate the activities of a metal shredding facility in accordance with any other applicable law.
(7)This chapter does not impair the rights of any person under any state or federal law.
(b)It is the intent of the Legislature that this chapter be implemented in a manner that achieves all of the following:
(1)Promotes the economic viability of all metal shredding facilities, regardless of size, so as to ensure the continued capacity of the state to manage the large volume of scrap metal that is produced in California every year.
(2)Protects public health and the environment and all communities, including those that have been designated as disadvantaged or vulnerable pursuant to state law.
(3)Does not cause disproportionate and potentially discriminatory impacts on local communities, consistent with Title VI of the federal Civil Rights Act of 1964 (Public Law 88-352) and Section 11135 of the Government Code.
(c)It is the intent of the Legislature that metal shredding facilities be regulated pursuant to this chapter and not Chapter 6.5 (commencing with Section 25100).
2.Definitions and General Provisions25095.1.For purposes of this chapter, the following definitions apply:
(a)Chemically treated metal shredder residue or CTMSR means the waste generated from the processing of shredded metallic materials, which may include, but is not limited to, end-of-life vehicles, appliances, and other metal-containing items, by a metal shredding facility where recoverable ferrous or nonferrous metals have been removed and the remaining metal shredder residue has been treated by a waste stabilization process, as described in this chapter.
(b)Corrective action means all actions necessary to mitigate any public health or environmental threat resulting from a release into the environment of hazardous substances from an operating or closed metal shredding facility and to restore the environmental conditions as necessary to protect human health and the environment.
(c)Department means the Department of Toxic Substances Control.
(d)Effective date means the date that this chapter becomes operative.
(e)Existing metal shredding facility means a metal shredding facility that is conducting metal shredding and metal processing operations as of the date that the act adding this chapter is signed into law by the Governor.
(f)Feeder yard means a metal recycling facility that collects, sorts, or processes scrap metal, through means other than the use of a hammer mill, from which scrap metal is sold to customers or transferred to a metal shredding facility for further processing and recycling.
(g)Feedstock means material received by a metal shredding facility before shredding and processing, including, but not limited to, end-of-life vehicles, household appliances, or other forms of light gauge metal suitable for processing in a metal shredder. Feedstock is often referred to as light iron or tin.
(h)Light fibrous material means a fibrous mixture of nonmetallic materials, including, but not limited to, synthetic fabric and carpet fibers, and entrained metallic particles, often representing the lightest fraction of metal shredder aggregate produced from the shredding of end-of-life vehicles and other metallic items, that is susceptible to dispersal into the environment.
(i)Metal processing operations means the stockpiling and handling of metal shredder aggregate, the operations undertaken to separate, sort, and remove ferrous or nonferrous scrap metal from metal shredder aggregate, and the treatment and storage of metal shredder residue. Metal processing operations does not include shredding, crushing, baling, shearing, cutting, or other metal recycling operations unrelated to the handling of metal shredder aggregate.
(j)Metal products means all ferrous and nonferrous metals that have been removed from metal shredder aggregate or from metal shredder residue.
(k)Metal shredder aggregate means the mixture of shredded metallic and nonmetallic materials that is produced by the shredding of metallic feedstock and that is subsequently processed for the purpose of separating, sorting, and removing ferrous metals, nonferrous metals, or other recyclable commodities from nonrecyclable materials. Metal shredder aggregate does not include (1) metals that have been removed from metal shredder aggregate, or (2) metal shredder residue. Metal shredder aggregate is an in-process material and is not a waste or a hazardous waste.
(l)Metal shredder residue means waste comprising shredded plastics, rubber, glass, foam, fabric, carpet, wood, dirt, or other debris, that remains after recoverable ferrous and nonferrous metals or other recyclable commodities have been separated and removed from metal shredder aggregate. Metal shredder residue does not include chemically treated metal shredder residue.
(m)Metal shredding facility means the entire site under the control of the owner or operator of a facility that uses a stationary or mobile shredder, such as a hammer mill or other shredding technique, to process end-of-life vehicles, appliances, or other metallic feedstock materials in order to facilitate the separation, sorting, or removal of recoverable ferrous or nonferrous metals from nonrecyclable materials. Metal shredding facility does not include a feeder yard or other scrap metal recycling facility that operates a metal crusher, a metal shear, or a metal baler if that facility does not conduct metal shredding operations.
(n)New metal shredding facility means a metal shredding facility that had not commenced metal shredding and metal processing operations as of the effective date.
(o)Operator means the person responsible for the overall operation and management of a metal shredding facility.
(p)Owner means a person who owns a metal shredding facility in whole or in part.
(q)Person means any of the following:
(1)An individual, trust, firm, joint stock company, business concern, partnership, limited liability company, association, or corporation, including, but not limited to, a governmental corporation.
(2)A city, county, district, commission, the state, and any department, agency, or political subdivision thereof.
(3)An interstate body.
(4)The federal government and any department or agency thereof, to the extent permitted by law.
(r)Scrap metal has the same meaning as provided in Section 66260.10 of Title 22 of the California Code of Regulations.
(s)Small metal shredding facility means a facility that processes no more than 250 tons per day or 65,000 tons per year of metallic feedstock materials using a stationary hammer mill and meets each of the following conditions:
(1)The facility does not shred whole end-of-life vehicles, whole agricultural equipment, or whole white goods.
(2)The facility does not conduct on-site chemical treatment of metal shredder residue.
(3)The facility does not conduct any activity that requires the use of an on-site thermal oxidizer.
25095.2.The following facilities are not subject to this chapter:
(a)Facilities that shred only e-waste subject to regulation under Chapter 23 (commencing with Section 66273.1) of Division 4.5 of Title 22 of the California Code of Regulations.
(b)Facilities that shred wood or wood products that may contain ancillary metal components, including, but not limited to, screws, bolts, metal ties, and metal strapping.
(c)Facilities that shred only automotive tires.
(d)A feeder yard or other scrap metal recycling facility that operates a metal crusher, metal shear, or metal baler if that facility does not conduct metal shredding operations.
(e)A metal shredding facility that processes exclusively nonferrous metals that do not contain any nonmetallic materials and whose operations do not produce any metal shredder aggregate or result in the generation of metal shredder residue.
25095.3.Metal shredding facilities that are subject to regulation and comply with this chapter are not hazardous waste facilities. However, this chapter does not alter or override the authority of the department or a unified program agency, as defined in Section 25404, to regulate hazardous waste generated at a metal shredding facility in accordance with Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations.
25095.4.(a)On the effective date, the departments Official Policy and Procedure 88-6, titled Auto Shredder Waste Policy and Procedures dated November 21, 1988, is hereby repealed.
(b)On the effective date, any nonhazardous waste determination issued by the department or its predecessor, the State Department of Health Services, to any metal shredding facility pursuant to Section 66260.200(f) of Title 22 of the California Code of Regulations is hereby repealed.
25095.5.A citation or reference in this chapter to a requirement of the regulations in Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations or to a specific provision of Chapter 6.5 (commencing with Section 25100) relating to hazardous waste shall be understood to apply the technical requirements of those regulations or standards to metal processing operations authorized pursuant to this chapter and to the materials processed by those operations, notwithstanding the exclusion of those materials from the definitions of waste and hazardous waste established by this chapter. All citations or references to those requirements shall be to the provision as it read on the effective date.
25095.6.This chapter does not limit the authority of a local air pollution control district or air quality management district, as defined in Section 39025, or the authority of a unified program agency, as defined in Section 25404, or the authority of a local environmental health department that is not a unified program agency to regulate any activity at a metal shredding facility that falls within the scope of the agencys jurisdiction under existing law.
25095.7.The department may adopt regulations as necessary to implement this chapter, and thereafter may update and revise the regulations from time to time, consistent with this chapter. The department shall adopt regulations to implement Section 25095.50, relating to the imposition of fees on metal shredding facilities.
25095.8.Except as otherwise expressly defined or provided in this chapter or regulations implementing this chapter, all terms in this chapter that are defined in Article 2 (commencing with Section 25110) of Chapter 6.5 or its implementing regulations shall have the meaning provided in Article 2 (commencing with Section 25110) of Chapter 6.5 and its implementing regulations.
3.Permits and Operations25095.10.(a)(1)Except as provided in paragraph (2), a metal shredding facility shall not operate in California, unless it has a permit issued by the department.
(2)On and after the effective date, an existing metal shredding facility operating in compliance with the requirements of this chapter, including the provisions of a compliance plan approved by the department pursuant to subdivision (a) of Section 25095.11 and the schedule for any interim measures or controls issued pursuant to subdivision (i) of Section 25095.11, may continue to operate pending final action on a permit application as specified in this section. Without exception, the facility shall have developed and shall continuously implement a fire prevention, detection, and response plan and comply with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13. Except as provided in this section, nothing herein shall prevent the department from taking enforcement action pursuant to Article 8 (commencing with Section 25095.60) before issuance of a final permit.
(3)Any permit approved by the department pursuant to this chapter shall include a reference to all permits issued to the facility by other environmental regulatory agencies. Any action taken by the department pursuant to this chapter shall be consistent with the requirements imposed by those regulatory agencies. The department shall evaluate how to apply to metal shredding facilities its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations as described in subdivisions (b) and (c) of Section 25200.21.
(4)(A)Any permit action shall consider the conclusions and recommendations set forth in a community emissions reduction program prepared pursuant to Section 44391.2 and any other health risk assessment conducted by a local air district pursuant to the Air Toxics Hot Spots Information and Assessment Act of 1987 (Part 6 (commencing with Section 44300) of Division 26) or other applicable law. If an air quality health risk assessment has not been conducted, the owner or operator of the facility shall conduct an analysis of equivalent scope and depth as approved by the local air district.
(B)Before taking final action to issue a permit for a metal shredding facility under this chapter, the department shall determine on the basis of substantial evidence that operation of the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities.
(5)Each permit issued under this chapter shall set forth inspection, entry, monitoring, compliance certification, and reporting requirements to assure compliance with the permit terms and conditions. Any report required to be submitted by a metal shredding facility pursuant to a permit issued under this chapter shall be signed by the owner or operator and shall be certified under penalty of law in the manner specified in Section 66270.11 of Title 22 of the California Code of Regulations.
(b)(1)A person who submitted a hazardous waste facility permit application pursuant to Chapter 6.5 (commencing with Section 25100) to treat metal shredder residue before the effective date may withdraw that application and conduct those treatment operations pursuant to this chapter.
(2)Within 30 days of the effective date, the owner or operator of an existing metal shredding facility shall submit a notice of intent to apply for a permit. Thereafter, the owner or operator of an existing metal shredding facility shall apply to the department for a permit pursuant to this chapter no later than six months following submittal of the notice of intent, except a small metal shredding facility shall apply for a permit no later than one year following submittal of the notice of intent. In all cases, the application shall include all of the following information:
(A)A description of the metal processing operations conducted at the metal shredding facility, including all equipment used for this purpose.
(B)A metal shredding facility inspection plan, as specified in paragraph (3) of subdivision (a) of Section 25095.13, including, without limitation, inspection of the area surrounding the hammer mill and all downstream metal processing equipment where light fibrous material is likely to accumulate.
(C)A plan for the prevention, detection, and response to fires that includes, at a minimum, provisions for the continuous monitoring of stockpiles of shredder feedstock and metal shredder aggregate for increases in temperature, periodic fire patrols, regular watering of feedstock and aggregate piles, availability of adequate water supplies, water pressure and fire-fighting equipment at the facility, maintenance of fire lanes, and operator training in fire prevention, detection, and response.
(D)A closure plan.
(E)A metal shredding facility housekeeping plan that includes, but is not limited to, daily cleanup of light fibrous material that is susceptible to dispersal beyond the hammer mill.
(F)An inventory management plan that includes procedures that will be implemented to ensure compliance with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13.
(G)A facility security plan consistent with the requirements of Section 66265.14 of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(H)A preparedness and prevention plan consistent with the requirements of Article 3 (commencing with Section 66265.30) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(I)A contingency plan consistent with the requirements of Article 4 (commencing with Section 66265.50) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(J)A flood plain map, if applicable.
(K)Evidence of financial assurance for closure and third-party liability consistent with the requirements of Article 8 (commencing with Section 66265.140) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(L)A plan describing any offsite or out-of-state transportation and processing of metal shredder aggregate, including, but not limited to, the estimated amount of material that is transported, the identity and federal Standard Industrial Classification code of the receiving facility, the estimated amounts of metals that are recovered from the material that is transported offsite, the required insurance, and any other information requested by the department to evaluate whether metal recycling operations are being conducted at the receiving facility.
(M)A compliance plan and schedule if required pursuant to subdivision (a) of Section 25095.11.
(N)A training plan that addresses each of the following areas:
(i)Prevention of releases of metal shredder aggregate, including light fibrous material, and metal shredder residue.
(ii)Fire prevention, detection, and suppression.
(iii)Response to natural disasters, such as earthquakes, wildfires, and floods.
(iv)Emergency response procedures and notification.
(v)Inventory management.
(3)The department shall post all information provided by the owner or operator of a metal shredding facility pursuant to paragraph (2) on the departments internet website in a manner that is readily accessible to the public, consistent with exceptions or exemptions under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
(4)The department shall review the permit application submitted pursuant to paragraph (2) as expeditiously as possible and shall take final action to approve, modify, or deny the application within three years after the application has been determined to be complete. For purposes of this subdivision, the department shall consider an application to be complete if it includes each of the plans and other information specified in subdivision (a). Failure of the owner or operator to provide a complete permit application within one year shall be grounds for the department to initiate denial of the application, subject to the following:
(A)The three-year period for review of an application may be extended as necessary for completion of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) process.
(B)If the department does not complete the permit process and issue the permit within three years, the department shall provide written notice to the public, setting forth an explanation for the delay, and shall conduct a public meeting upon request.
(C)If the owner or operator of a facility has timely submitted a complete application and responded to any additional requests for information from the department, the facility may continue to operate, subject to all requirements applicable to the facility under this chapter, pending final action on its permit application even if the department does not complete the permit review process within the timeframe specified in this paragraph.
(5)The owner or operator shall comply with the provisions of each plan required under paragraph (2) as approved by the department and incorporated into the permit for the facility. The department shall impose any additional facility-specific conditions that are necessary to ensure compliance with this chapter and for the protection of human health and the environment. The department shall provide the owner or operator of the metal shredding facility with written findings explaining the basis for any such conditions.
(6)In reviewing any plan submitted pursuant to subparagraph (L) of paragraph (2), the department may request additional information from the owner or operator as necessary to determine the legitimacy of the offsite metal processing operations described in the plan, and may require modifications to the plan, or disapprove the plan, if the department determines that the receiving facility is not engaged in legitimate metal recycling.
(7)In considering an application for a metal shredding facility permit submitted pursuant to this subdivision, and the specific terms and conditions to be included in the permit, the department shall consider the site-specific aspects of the metal shredding facility, including, but not limited to:
(A)The nature of the surrounding community and environment.
(B)The results of any community-specific assessment.
(C)The facility size, location, and configuration.
(D)The equipment, enclosures, and infrastructure.
(E)The specific metal processing operations conducted at the metal shredding facility, including types of feedstocks and annual throughput.
(F)Other relevant site-specific characteristics.
(8)The department shall also conduct at least one site visit to the applicants facility after receipt of the permit application.
(c)(1)The owner or operator of a new metal shredding facility shall submit an application to the department for a permit and shall not commence operations at the new metal shredding facility until the department issues a permit.
(2)The application shall consist of both of the following:
(A)All the information described in paragraph (2) of subdivision (b).
(B)Any other information requested by the department relating to construction or operation of the new metal shredding facility.
(d)(1)The approval of an application for an existing or new metal shredding facility shall be considered a discretionary decision subject to the California Environmental Quality Act ((CEQA) Division 13 (commencing with Section 21000) of the Public Resources Code). Nothing in this chapter is intended to modify, restrict, or expand the provisions of CEQA as applied to metal shredding facilities.
(2)The department may require an applicant for a metal shredding facility permit to submit additional information in support of an application.
(e)A permit issued pursuant to this section shall authorize the storage and processing of metal shredder aggregate, and the onsite chemical treatment of metal shredder residue conducted at the metal shredding facility, if chemical treatment of residue is included in the permit application. A metal shredding facility that begins chemical treatment of metal shredder residue for the first time after the effective date shall notify the department no later than 30 days before commencement of treatment operations at the facility and shall provide the department with all information required by this chapter relating to the chemical treatment operations within 120 days of commencement of operations. This section does not require a permit for the operation of a hammer mill or other equipment used at a metal shredding facility that does not involve the handling of metal shredder aggregate or chemical treatment of metal shredder residue.
(f)(1)Any permit for a metal shredding facility approved under this chapter shall be for a fixed term of 10 years, unless the department determines that a shorter term is necessary to protect human health, safety, or the environment or based on the compliance history of the facility.
(2)At least two years before the expiration of a permit, the owner or operator of a metal shredding facility intending to renew the facilitys permit shall submit a complete application for permit renewal, pursuant to this section, that has been updated to reflect the current operations of the facility.
(3)The department shall review the information and either determine the submission is complete or request additional information from the owner or operator. If the application to renew the permit is submitted before the end of the fixed term, the permit shall be deemed extended until the department has taken final action to renew or deny the renewal application and the owner or operator has exhausted all applicable rights of appeal.
(4)When prioritizing pending renewal applications for review and in determining the need for any new conditions on a renewed permit, the department shall consider any input received from the public.
(g)The department shall consider the compliance history of the metal shredding facility, including the requirements of any permit issued by any other agency in reviewing the facilitys application for permit renewal and in considering the need for additional conditions to be included in the permit.
(h)(1)The requirements of this subdivision apply to all permit applicants.
(2)Before the submission of a permit application or application for permit renewal for a metal shredding facility, the applicant shall hold at least one public meeting, or other community engagement activity approved by the department, to inform the community of metal processing activities and any potential impacts to nearby communities and solicit questions and input from the public. The applicant shall prepare a sign-in sheet for the meeting and allow all attendees an opportunity to provide their names and addresses. The public meeting or community engagement activity shall be noticed to the community at least 30 days in advance, using a form of communication preferred by the community, and be held in an accessible location at a convenient time. The applicant shall invite the department and other regulatory agencies with jurisdiction over the metal shredding facility.
(3)The applicant shall submit a summary of the meeting or activity described in paragraph (2), and a list of attendees and their addresses voluntarily provided pursuant to paragraph (2), if any, and copies of any written comments or materials submitted, if any, to the department as a part of the permit application or application for permit renewal. The summary of the preapplication meeting or activity shall include, but not be limited to, all of the following:
(A)A summary of the metal shredding facilitys communications to the public about proposed or then current metal processing activities and their potential impacts on nearby communities.
(B)A summary of public input and questions.
(C)Responses to public input and questions and how public input has informed the application materials, if applicable.
(4)After the submission of a complete permit application or application for permit renewal for a facility, and before the public meeting described in paragraph (5), the department shall schedule periodic progress meetings to inform the community of the status of the permitting process, including the owners or operators implementation of any interim measures or controls required by the department pursuant to Section 25095.11. Meetings shall be held pursuant to this paragraph at least once per year and shall be noticed and convened as specified in paragraph (2).
(5)Before a decision is made to approve or deny the application, the department shall solicit comment from the community on the completed application materials and hold a public meeting. The public comment period shall be open for a minimum of 45 days. The department shall respond to all public comments within 60 days of the close of the public comment period. The public comments and the departments responses to the comments shall be included in the administrative record for the permit proceeding and in the departments notice of its intended decision to approve or deny the permit.
(6)Before initiating a public outreach process, the department and the owner or operator of a metal shredding facility shall solicit and incorporate feedback from the surrounding community to determine a locally appropriate process for community engagement.
(i)The department shall post on its internet website general information about each metal shredding facility that has applied for or obtained a permit under this chapter, including without limitation the facilitys current permit status, a schedule for issuance of a draft permit and associated public meetings and opportunity for public comment periods, and a summary of the facilitys compliance history subsequent to the effective date.
(j)The department shall include in the fire response plan for a metal shredding facility any reasonable and necessary additional requirements or conditions that are recommended by the local fire department.
(k)The department, when considering the application for a metal shredding permit for a small metal shredding facility, shall take into consideration the size and nature of the facility when processing the permit application and assessing fees.
25095.11.Notwithstanding Section 25095.10, an owner or operator of a metal shredding facility that has submitted a permit application and is unable to comply with all the requirements of this chapter as of the effective date may continue to operate pending the departments final permit decision, subject to all of the following requirements specified in this section. Failure to meet the requirements of this section shall be subject to enforcement under Article 8 (commencing with Section 25095.60).
(a)(1)The owner or operator identifies in its application each provision of this chapter that the facility is unable to immediately comply with, including, without limitation, provisions applicable to management of metal shredder aggregate, light fibrous material, and metal shredder residue, and has developed and implemented a plan and schedule approved by the department for achieving compliance with the provisions of this chapter.
(2)Plans shall be submitted along with the permit application required in subdivision (b) of Section 25095.10.
(b)On or before the effective date, the owner or operator complies with the requirements set forth in subdivision (b) of Section 25095.13. A copy of the fire response plan shall be submitted to the department within seven days of the effective date and shall be subject to review and approval of the department after consultation with the facility and the local fire department of the jurisdiction where the facility is located.
(c)On or before the effective date, the owner or operator complies with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13.
(d)The owner or operator initiates, diligently pursues, and implements financial assurance for closure and third-party liability as required pursuant to Section 25095.41, including, but not limited to, both of the following:
(1)The owner or operator submits to the department a cost estimate and closure plan as part of the permit application.
(2)Within 30 days after the permit application is submitted, the owner or operator submits to the department a financial assurance mechanism that is equivalent to the requirements set forth in Sections 66264.143 and 66264.147 of Title 22 of the California Code of Regulations, except that a small metal shredding facility may submit the financial assurance mechanism within 90 days after the permit application is submitted.
(e)The owner or operator initiates and diligently pursues to completion a preliminary endangerment assessment, as required pursuant to Section 25095.30, or otherwise meets the requirements in Section 25095.30 and initiates any required actions identified in the preliminary endangerment assessment.
(f)The owner or operator complies with the standards set forth in Chapter 12 (commencing with Section 66262.10) of Division 4.5 of Title 22 of the California Code of Regulations with respect to all hazardous wastes generated at the facility.
(g)The owner or operator, at a minimum, maintains all existing practices and controls that are in effect or otherwise required by the department, a unified program agency, or a local environmental health department on or before the effective date, that are designed to prevent the possibility of any unplanned sudden or nonsudden release of any of the following into air, soil, or water that could threaten human health or the environment:
(1)In-process materials or components thereof, including metal shredder aggregate and light fibrous material.
(2)Hazardous waste or hazardous waste constituents.
(3)Metal shredder residue.
(4)Chemically treated metal shredder residue.
(h)The owner or operator complies with the following standards:
(1)Containment areas shall be in good condition; if there is a leak, contents shall be immediately transferred.
(2)Accumulation areas shall be inspected at least weekly.
(3)Containment areas shall be visibly labeled with contents and start date of accumulation. If labeling is infeasible, a record of the start dates of accumulation shall be maintained and made available to the public upon request.
(4)Incompatible materials shall not be kept together.
(5)All emergency equipment shall be regularly tested or maintained according to manufacturer standards.
(6)Employees shall have unimpeded access to emergency materials.
(7)There shall be at least one person on premises or on call at all times.
(8)Personnel training shall be required for emergency procedures for all possible emergencies and prevention requirements and shall include job specific and general awareness training.
(i)The owner or operator shall be subject to any interim measures or controls established by the department during consideration of the permit application that are necessary for the protection of human health and the environment. The department shall provide the owner or operator of the metal shredding facility with written findings explaining the basis for those interim requirements and a reasonable schedule for compliance with those measures.
25095.12.The owner or operator of a metal shredding facility shall operate the metal shredding facility in accordance with all of the following requirements:
(a)(1)The metal shredding facility shall be maintained and operated to minimize the possibility of a fire, explosion, or any unplanned sudden or nonsudden release of in-process materials or components thereof, including metal shredder aggregate and light fibrous material, into air, soil, or water that could threaten human health or the environment by implementing all reasonable and feasible operational or engineering methods of control, including, but not limited to, technologies or equipment taking into consideration the size, configuration, and location of the facility, the characteristics of the materials handled, and other relevant factors.
(2)The owner or operator shall take precautions to prevent accidental ignition or reaction of material that exhibits the characteristics of ignitability or reactivity. While ignitable or reactive material is being handled, the owner or operator shall confine smoking and open flame to specially designated locations. No Smoking signs shall be conspicuously placed wherever there is a hazard from ignitable or reactive material.
(3)The transfer, treatment, storage, or disposal of ignitable or reactive material shall be conducted so that it does not do any of the following:
(A)Generate extreme heat or pressure, fire or explosion, or violent reaction.
(B)Produce uncontrolled toxic mists, fumes, dusts, or gases in sufficient quantities to threaten human health or the environment.
(C)Produce uncontrolled flammable fumes or gases in sufficient quantities to pose a risk of fire or explosions.
(D)Damage the structural integrity of the device or facility containing the material.
(E)Any other activity similar to those listed in subparagraphs (A) to (D), inclusive, that threatens human health or the environment.
(b)(1)The owner or operator of the metal shredding facility shall develop and follow an inbound source control policy designed to prevent the shredding of any of the following materials or wastes at the facility:
(A)RCRA hazardous waste, as defined in Section 66261.100 of Title 22 of the California Code of Regulations, and non-RCRA hazardous waste, as defined in Section 66261.101 of Title 22 of the California Code of Regulations.
(B)Asbestos and asbestos-containing materials, except incidental asbestos-containing material that may be contained inside equipment and is not visible upon inspection.
(C)Radioactive materials.
(D)Petroleum-based wastes, including, but not limited to, used oil as defined in Section 25250.1, gasoline, and diesel, but not including non-free-flowing residual quantities of such wastes contained in depolluted vehicles or appliances.
(E)Polychlorinated biphenyls (PCB) materials and wastes, including, but not limited to, capacitors, electrical transformers, and transformer components.
(F)Fluorescent light ballasts, fluorescent lamps, neon, and high-intensity or mercury vapor lights.
(G)Military ordnance, except ordnance designated specifically as Material Designated as Safe (MDAS).
(H)Explosives, explosive residues, fireworks, and other incendiary materials.
(I)Regulated electronic waste.
(J)Mercury containing devices.
(K)Batteries, including, but not limited to, lead-acid batteries and lithium-ion batteries.
(L)Compressed gas cylinders and propane canisters, unless empty and disabled.
(M)Materials requiring special handling, as defined in Section 42167 of the Public Resources Code.
(2)The inbound source control policy shall contain all of the following:
(A)A written description of the load checking protocol designed to prevent materials or wastes identified in paragraph (1) from being shredded at the facility. Incoming feedstock subject to load checking shall not be shredded until the load-checking process has been completed.
(B)A written description of the process for rejecting loads, specific materials, or wastes that contain the materials or wastes identified in paragraph (1).
(C)A plan and template documents used to demonstrate that load checks are conducted and that materials or wastes identified in paragraph (1) are not accepted.
(D)A requirement to maintain all documentation related to the inbound source control policy and load checking the facility for at least five years and provide the documentation to the department upon request.
(E)A written description of a process to make a waste determination pursuant to Section 66262.11 of Title 22 of the California Code of Regulations for any of the materials or wastes listed in paragraph (1) that are identified after completion of the load check process and that were unknowingly accepted by the facility. Any waste determined to be a hazardous waste shall be considered generated at the metal shredding facility and shall be managed as a hazardous waste in accordance with Chapter 6.5 (commencing with Section 25100) and its implementing regulations.
(c)The owner or operator of the metal shredding facility shall develop and implement procedures for any depollution operations that are conducted at the metal shredding facility involving the removal of automotive fuels, lubricating oils, refrigerants, and materials that require special handling, as defined in Section 42167 of the Public Resources Code, including procedures for the proper management of those materials or wastes that are removed during depollution operations, pursuant to Section 25212.
(d)(1)The owner or operator of the metal shredding facility shall maintain all of the following documents at the metal shredding facility:
(A)A written inspection schedule meeting the substantive requirements of subdivision (b) of Section 66265.15 of Title 22 of the California Code of Regulations.
(B)A written description of training documents, including a syllabus or outline, of the type and amount of both introductory and continuing training that has been given to each person at the metal shredding facility.
(C)A contingency plan that contains the information specified in Section 66265.52 of Title 22 of the California Code of Regulations.
(D)A copy of any local air quality management district or air pollution control district permit and other governmental permits or approvals required for operation of the metal shredding facility equipment.
(E)The closure plan required under Section 25095.40.
(F)A copy of documents related to any environmental investigation and any cleanup or other remediation measures implemented at the facility within the last five years.
(G)The housekeeping plan prepared pursuant to Section 25095.13.
(H)Records of offsite transportation of metal shredder aggregate and CTMSR.
(2)The owner or operator shall make the documents described in paragraph (1) available at the metal shredding facility to the department, the United States Environmental Protection Agency, or a local governmental agency upon request.
(e)The owner or operator of a metal shredding facility shall comply with all of the following:
(1)Subdivision (b) of Section 66265.142 of Title 22 of the California Code of Regulations.
(2)The contingency plan as required in subparagraph (C) of paragraph (1) of subdivision (d).
(3)As applicable, Article 3 (commencing with Section 66265.30) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(4)Article 16 (commencing with Section 66265.370) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(f)The owner or operator of a metal shredding facility shall provide notice to the department of an imminent or actual emergency situation, as required by Section 66265.56 of Title 22 of the California Code of Regulations.
(g)The owner or operator of a metal shredding facility shall provide written notice to the department at least 60 days before transferring ownership or operation of the facility.
(h)The owner or operator shall prevent the unknowing entry, and prevent unauthorized entry, of persons or livestock onto the active portion of the facility.
(i)For any new construction at a facility located in a 100-year floodplain or within the maximum high tide, the facility shall take all reasonable and feasible precautions to prevent washout of any hazardous materials.
(j)For any new construction at a facility, the facility shall take all reasonable and feasible precautions to withstand the maximum credible earthquake.
25095.13.The owner or operator of a metal shredding facility shall develop and comply with plans and minimum standards relating to each of the following aspects of the metal processing operation:
(a)The control of releases, including, but not limited to:
(1)Plans for complying with applicable local air quality management district or air pollution control district regulations and permit requirements, including the requirements of any approved emissions minimization plan or comparable plan required by applicable regulations.
(2)A housekeeping plan that is approved by the department and that does all of the following:
(A)Details all measures to control dispersal of metal shredder aggregate and its constituents, including light fibrous material, and metal shredder residue and constituents. Those measures shall include, but are not limited to, mechanical and manual sweeping, washing or cleaning of equipment and structures to remove accumulated debris, application of water using water trucks, sprinklers, spray bars, deluge systems or other dust suppression equipment, fencing, and enclosures.
(B)Specifies the frequency for each measure detailed pursuant to subparagraph (A).
(C)Addresses the disposition of residuals generated from cleaning, including, but not limited to, debris, sweepings, rinse water, and any other material that does not contain recoverable ferrous or nonferrous metal.
(D)Requires the completion of written logs of all housekeeping activities. The written logs shall be maintained in accordance with Section 25095.12.
(E)Requires the management of any light fibrous material that has been released from the facility to be subject to regulation under Chapter 6.5 (commencing with Section 25100).
(3)A metal shredding facility inspection plan that is approved by the department. The metal shredding facility inspection plan shall include all of the following:
(A)Inspection of all facilities and equipment that is used to manage metal shredder aggregate.
(B)A copy of a general inspection schedule that complies, with the specific requirements in Sections 66264.174, 66264.195, 66264.254, 66265.403, and 66264.1101 of Title 22 of the California Code of Regulations, and, as applicable, complies with the specific requirements in subdivision (i) of Section 66264.193, and Sections 66264.195, 66264.226, 66264.273, 66264.303, 66264.602, 66264.1033, 66264.1052, 66264.1053, 66264.1058, 66264.1084, 66264.1085, 66264.1086, 66265.1088, and 66264.1101 of Title 22 of the California Code of Regulations.
(C)All areas where the deposition of metal shredder aggregate, including light fibrous material and metal shredder residue may occur, including accessible areas within 500 feet of the metal shredding facilitys property boundary or further as determined by the department.
(4)An inventory management plan, that is approved by the department, to prevent accumulation of shredder feedstock and metal shredder aggregate and treated or untreated metal shredder residue in excess of the limitations set forth in subparagraph (E) of paragraph (2) of subdivision (b).
(5)Standards for the installation and maintenance of paving with concrete, steel plate, or other surfacing materials approved by the department that are designed to prevent infiltration and to collect and route water to a water management system. The paving shall be inspected quarterly and repaired as needed. The results of the paving inspections and any paving repairs shall be submitted to the department with the annual report and as requested by the department.
(b)(1)A separate written plan for the prevention, detection, and suppression of fires. The plan shall comply with all of the following:
(A)Be shared with local emergency responders.
(B)Be used to monitor metal shredding facility operations for evidence of incipient fire.
(C)Establish procedures for responding to fires of different duration and severity.
(D)Be activated in response to any incident at the metal shredding facility that falls within the scope of the plan.
(2)The plan shall include all of the following:
(A)Procedures for response to incipient fires and access to adequate water, water pressure, firefighting foam, and other supplies at the metal shredding facility that can be used in responding to an incipient or larger fire.
(B)Training of metal shredding facility personnel in the proper use of fire-response equipment and procedures and notification requirements.
(C)Coordination with local fire departments, the unified program agency, if other than the fire department, and other first responders as necessary to support maximum effectiveness in responding to an emergency at the metal shredding facility.
(D)Monitoring of temperatures on all feedstock and metal shredder aggregate piles, using an infrared camera or other equivalent equipment that continuously monitors the temperature of feedstock and aggregate piles and provides an alarm or other indication of temperature increases outside normal range.
(E)Inventory management provisions necessary to prevent the accumulation of feedstock or metal shredder aggregate at the facility in quantities that exceed the reasonable holding capacity of the facility and that cannot be processed within normal operating cycles, including typical periods of breakdown, maintenance, and repair. The following limits shall apply:
(i)No individual stockpile of feedstock shall exceed the amount of material that can be processed within a 24-hour period.
(ii)No individual pile of metal shredder aggregate shall exceed the amount of material that can be processed within a 48-hour period.
(iii)No individual pile of feedstock or metal shredder aggregate shall remain inactive for more than 48 hours except during periods when the facility is closed or not operating. Periods of breakdown, maintenance and repair, or under other circumstances specified in the facilitys approved inventory management plan, shall not be included in calculating the 48-hour period. A pile shall not be considered inactive if the majority of the material in the pile is removed over a period of 48 hours. In the event of an incident that is required to be reported to the department under Section 25095.31, the department may reduce the number of hours that a pile of feedstock or metal shredder aggregate may remain inactive until the owner or operator demonstrates to the satisfaction of the department and the local fire department that the risk of fire has been mitigated.
(iv)During any period of breakdown and associated repair that exceeds 72 hours, the feedstock and metal shredder aggregate piles shall be subject to additional controls as specified in the facilitys approved inventory management plan. Any shredder feedstock accepted by the facility during a period of breakdown, maintenance, or repair exceeding 72 hours shall be managed in accordance with the facilitys approved inventory management plan.
(v)All feedstock and metal shredder aggregate piles shall be subject to continuous 24-hour onsite surveillance, including when the facility is not operating, and such other additional controls specified in the facilitys approved fire response plan. All electronic surveillance data shall be maintained for a period of at least 14 days following any incident that is required to be reported to the department under Section 25095.31.
(F)Provisions for capture and management of fire suppression water as necessary to prevent discharge into storm drains or runoff into surface water.
(G)Requirement for at least one person to be present at the facility or on call at all times.
(3)The department, in coordination with the local fire department of the jurisdiction where the metal shredding facility is located, shall review a facilitys fire response plan on an annual basis and require the owner or operator to update the plan if necessary based on changes in technology or fire prevention practices, or the facilitys compliance history and history of fire, explosion, or release of hazardous waste or hazardous waste constituents.
(c)Stormwater management and control, including, but not limited to:
(1)Containment of stormwater in retention ponds, sumps, tanks, and associated piping or other engineered retention units to minimize free-standing water at the metal shredding facility.
(2)A stormwater testing plan to identify if stormwater exhibits any characteristics of toxicity as described in Section 66261.24 of Title 22 of the California Code of Regulations.
(3)Compliance with the metal shredding facilitys stormwater pollution prevention plan and spill prevention, control, and countermeasures plan.
(4)Discharge of stormwater in accordance with the general permit for discharges of stormwater associated with industrial activities or waste discharge requirements issued by a regional water quality control board, including sampling requirements.
25095.14.(a)Subject to subdivision (b), the owner or operator of a metal shredding facility may make the following physical or operational changes to the metal shredding facility without seeking prior approval from the department:
(1)Throughput increases and increases in maximum operating rate that are authorized or approved by an air quality management district or air pollution control district.
(2)Increases in efficiency of metal processing operations, including, without limitation, sizing, separation, sorting, removal, and recovery.
(3)Changes in design of processing equipment and conveyance systems.
(4)Changes in operations and methods of operation.
(5)Installation and modification of processing and other equipment and conveyance systems.
(6)Repair and replacement of processing and other equipment and conveyance systems.
(7)Decommissioning and removal of equipment and conveyance systems that are no longer in use.
(8)Construction of new structures and enclosures and changes to structures and enclosures.
(9)Installation and modification of abatement equipment and emission control systems.
(10)Installation of and modifications to water reuse and recycling systems.
(11)Installation of and repair to paving.
(12)Any other changes to the metal shredding facility unrelated to the storage or processing of metal shredder aggregate and metal shredder residue.
(b)Except as provided in subdivision (d), the changes described in subdivision (a) may be made without seeking prior approval from the department if the metal shredding facility maintains substantial compliance with this chapter and the owner or operator provides the department with written notice of these changes within 30 days of making the changes. The department shall post the notice on the section of its internet website that provides information regarding metal shredding facilities.
(c)The department shall evaluate the information provided in the notice from the facility pursuant to this subdivision, as well as any objections from the public, to assess whether the modification could result in a potentially significant impact on the environment. If the department determines that the modification could have a potentially significant impact on the environment, the owner or operator of the facility shall be required to implement changes to the modification as necessary to mitigate the impact to the extent feasible.
(d)The owner or operator of a metal shredding facility that proposes to modify the metal shredding facility in a manner that could result in a significant environmental impact from operations that were not considered by the department in reviewing the information submitted pursuant to this article shall provide the department with 60 days advance written notice of the modification and shall not implement the modification without approval from the department. The department shall provide notice of the proposed modification to the public and shall comply with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) in its review of the project.
(e)(1)On or before July 1 of each year, the owner or operator of a metal shredding facility shall submit an annual report to the department describing the material physical or operational changes, if any, made to the metal shredding facility during the previous calendar year relating to the management of metal shredder aggregate or metal shredder residue.
(2)Upon request by the department, the metal shredding facility shall be required to provide additional information about the nature or extent of changes described in the notice provided pursuant to subdivision (b) or the annual report as necessary to demonstrate the metal shredding facilitys ongoing compliance with applicable regulations.
(3)Physical changes to the metal shredding facilitys ongoing operations that are reported to the department in compliance with paragraph (1) may be reviewed and modified by the department as necessary to ensure compliance with the requirements of this chapter.
25095.15.(a)The owner or operator of a metal shredding facility shall manage all metal shredder aggregate during metal processing operations as necessary to achieve the following minimum standards:
(1)All outdoor equipment used for processing metal shredder aggregate shall be enclosed or covered and designed, operated, and maintained to minimize the possibility of the release of light fibrous material into the environment.
(2)All outdoor equipment used for the conveyance of metal shredder aggregate from one location within the metal shredding facility to another location within the metal shredding facility shall be enclosed or covered and designed, operated, and maintained to minimize the possibility of the release of light fibrous material into the environment.
(3)All vehicles used for the outdoor transfer of metal shredder aggregate shall be loaded and unloaded in a manner that minimizes the possibility of the release of metal shredder aggregate, including light fibrous material into the environment.
(b)Metal shredder aggregate shall be stored or accumulated inside a structure that protects the material from exposure to the elements and minimizes the possibility of the release of light fibrous material into the environment. At a minimum, the structure shall meet all of the following requirements:
(1)The structure shall be enclosed with a floor, roof, and walls sufficient to protect the metal shredder aggregate from exposure to the elements and to contain the metal shredder aggregate and any process residues that are managed in the structure.
(2)The roof shall completely cover all areas used for storage or accumulation of metal shredder aggregate.
(3)The floor shall be constructed of concrete surfacing, steel plate, or other surfacing material approved by the department designed to prevent infiltration and collect and route any water that drains from the metal shredder aggregate to a process water management system. The floor shall be inspected on a quarterly basis and repaired as needed. The results of the inspections and any repairs to the floor shall be included in the annual report submitted to the department pursuant to Section 25095.14.
(4)Any liquids that drain from materials stored inside the enclosure shall be collected and routed to the metal shredding facilitys recycled water management system.
(c)Trommel or augers shall be located in a building or otherwise covered or enclosed so as to minimize the possibility of releases.
(d)Subject to written approval by the department, stockpiling of metal shredder aggregate outside the confines of an enclosure required by subdivision (b) may be allowed for limited periods of time if all of the following conditions are met:
(1)The activity is necessary to accommodate unforeseen circumstances or operational disruptions that prevent the material from being stored inside an enclosure. These unforeseen circumstances or operational disruptions shall have been outside the reasonable control of the facility. The facility shall use best efforts to remedy any unforeseen circumstances or operational disruptions that necessitate outdoor stockpiling of metal shredder aggregate.
(2)The operator provides written notice to the department, the unified program agency, and the local fire department at least 24 hours before the need to store material outside arises.
(3)The operator conducts watering or other dust control measures to minimize the possibility of the release of light fibrous material from the stockpile into the environment.
(4)The outdoor stockpiling activity is conducted for 10 or fewer consecutive operating days.
(5)The outdoor stockpiling activity does not begin until approval is provided by the department. The department may rescind the temporary approval for outdoor stockpiling if the facility is not using best efforts to remedy any unforeseen circumstances or operational disruptions that necessitate outdoor stockpiling.
(e)The requirements of this section shall also apply to the management of untreated and treated metal shredder residue.
25095.16.(a)Metal shredder aggregate that is transported to an offsite metal shredding facility or metal recycling facility for purposes of processing shall be tarped or otherwise contained during shipment and transported in a manner that minimizes the possibility of release into the environment.
(b)The metal shredder aggregate shall be shipped directly to the offsite metal processing facility and shall not be handled at any interim location or held at any publicly accessible interim location for more than four hours unless required by hours of service or other applicable law or held by a rail transporter for reasons outside the control of the person arranging for transport.
(c)Each shipment of metal shredder aggregate by truck or rail shall be identified by a standard bill of lading or other shipping document that complies with applicable United States Department of Transportation requirements and that contains all of the following:
(1)The quantity, by weight, of metal shredder aggregate being transported.
(2)The name, physical and mailing addresses, and telephone number of the metal shredding facility that produced the metal shredder aggregate.
(3)The name, physical and mailing addresses, and telephone number of the metal processing facility that will process the metal shredder aggregate.
(4)The date the shipment of metal shredder aggregate leaves the originating metal shredding facility.
(5)The date the shipment of metal shredder aggregate is scheduled to arrive at the receiving metal processing facility.
(6)The name of the transporter that shipped the metal shredder aggregate from the originating metal shredding facility to the receiving metal processing facility.
(d)The originating metal shredding facility shall retain a copy of all shipping documents onsite, in either paper or electronic form, for a period of at least three years. The three-year record retention period may be extended at the direction of the department during the course of any unresolved enforcement action regarding the shipments.
(e)Transporters shall obtain and maintain liability insurance in accordance with Section 34631.5 of the Vehicle Code. A transporter shall cease to transport metal shredder aggregate upon loss of liability coverage.
(f)The owner or operator of the originating facility shall include in the annual report submitted to the department under Section 25095.14 the total tonnage of metal shredder aggregate that was shipped to another recycling facility for processing during the calendar year, the name of each transporter used for this purpose, the bill of lading numbers, and the total tonnage transported by that transporter during the calendar year, and the name and location of the facilities that processed the material. The department shall handle the information in a manner consistent with exceptions or exemptions under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
4.Classification of Materials25095.20.(a)Except as provided under the applicable provisions of the federal Resource Conservation and Recovery Act of 1976, as amended (42 U.S.C. Sec. 6901 et seq.), if managed in accordance with this chapter, including any plans approved by the department and any additional conditions imposed by the department pursuant to Section 25095.10 or 25095.11, the following materials are not waste, as defined in Section 25124, and shall not be subject to regulation under Chapter 6.5 (commencing with Section 25100) of this division or Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations:
(1)Scrap metal.
(2)Metal shredder aggregate that is managed in either of the following ways:
(A)The metal shredder aggregate is stored and processed at the same metal shredding facility that produced the metal shredder aggregate.
(B)The metal shredder aggregate is transferred to another metal shredding facility or metal recycling facility within federal Standard Industrial Classification Code 5093 for the purpose of processing or further processing the metal shredder aggregate to separate and remove ferrous or nonferrous metals, subject to all of the following:
(i)Either one of the following:
(I)The receiving facility is located in the State of California and operates in accordance with the requirements of this chapter.
(II)The receiving facility is located in a state other than the State of California and is operated in accordance with the law of the state where the receiving facility is located.
(ii)Before transportation offsite, the metal shredder aggregate is managed in accordance with the requirements of the plan approved by the department under subparagraph (L) of paragraph (2) of subdivision (b) of Section 25095.10.
(iii)The receiving facility keeps records of the amount of ferrous and nonferrous scrap metal recovered from the metal shredder aggregate and makes this information available to the department upon request.
(iv)The metal shredder aggregate is transported in accordance with the requirements of Section 25095.16.
(3)Intermediate metal products that are subject to further processing to improve product quality.
(4)Finished ferrous and nonferrous scrap metals that are separated or removed from metal shredder aggregate at a metal shredding facility.
(5)Nonmetallic recyclable items recovered from metal shredder aggregate for which a market exists.
(b)Notwithstanding subdivision (a) and any other provision of this chapter, metal shredder aggregate, including light fibrous material, that is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, shall be subject to regulation as hazardous waste under Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations, if it exhibits a characteristic of hazardous waste specified in those regulations.
25095.21.(a)Untreated metal shredder residue that meets the definition of a non-RCRA hazardous waste as defined in Section 66261.101 of Title 22 of the California Code of Regulations shall be chemically treated in accordance with this section or managed in accordance with all applicable requirements of Chapter 6.5 (commencing with Section 25100) and implementing regulations. Chemically treated metal shredder residue is not hazardous waste if all of the following conditions are met:
(1)Unless an alternative treatment recipe is approved by the department, untreated metal shredder residue shall be treated with at least 0.7 gallons of silicate solution per short ton of the untreated metal shredder residue and cement by weight equal to 8.5 percent of the weight of the untreated metal shredder residue.
(2)Metal shredding facilities shall document, on a weekly basis, how many tons of metal shredder residue was treated and how much silicate solution and cement were used in the treatment of the untreated metal shredder residue to comply with paragraph (1).
(3)The chemically treated metal shredder residue does not meet the definition of RCRA hazardous waste, as defined in Section 66261.100 of Title 22 of the California Code of Regulations.
(4)Immediately after waste stabilization, and at all times before offsite transportation and disposal, chemically treated metal shredder residue shall be managed in a manner that prevents releases of chemically treated metal shredder residue outside of a designated accumulation area. The designated accumulation area shall meet the requirements of either of the following:
(A)A self-supporting structure that meets all of the following requirements:
(i)The structure shall be fully or partially enclosed with a floor, at least three walls, and a roof to prevent exposure of the chemically treated metal shredder residue to the elements, including surface transport by precipitation runoff, contamination of soil and groundwater, and wind dispersal outside the enclosure.
(ii)The structure shall be constructed of man-made materials of sufficient strength and thickness to support themselves, the waste contents, any personnel and heavy equipment that operate within the unit, and the stresses of daily operation, such as the movement of personnel, wastes, and handling of equipment within the structure.
(iii)The designated accumulation area shall be labeled or marked clearly with the words Chemically Treated Metal Shredder Residue or CTMSR. The metal shredding facility shall comply with accumulation time limits as required in Section 66262.17 of Title 22 of the California Code of Regulations.
(B)A containment building that meets the requirements of either of the following:
(i)Article 29 (commencing with Section 66264.1100) of Chapter 14 of Title 22 of the California Code of Regulations.
(ii)Article 29 (commencing with Section 66265.1100) of Chapter 15 of Title 22 of the California Code of Regulations.
(b)Chemically treated metal shredder residue shall not be transported to, and shall not be disposed of at, any location other than one of the following:
(1)A composite-lined portion of a solid waste landfill unit that meets all requirements applicable to disposal of municipal solid waste in California after October 9, 1993, based on State Water Resources Control Board Resolution No. 93-62.
(2)A solid waste landfill or other facility that is regulated by waste discharge requirements issued pursuant to Division 7 (commencing with Section 13000) of the Water Code for discharges of designated waste, as defined in Section 13173 of the Water Code, or that allows for the discharge of chemically treated metal shredder residue. The discharge of chemically treated metal shredder residue includes its use as an alternative daily cover or for other beneficial reuse pursuant to Section 41781.3 of the Public Resources Code and the regulations adopted to implement that section.
(3)Any other landfill or location that is authorized by law to receive chemically treated metal shredder residue for disposal or beneficial use.
(c)The transporter of chemically treated metal shredder residue shall comply with all of the following conditions:
(1)Chemically treated metal shredder residue shall be contained and covered during shipment and transported in a manner that prevents any release into the environment.
(2)The transporter shall comply with all applicable United States Department of Transportation shipping requirements.
(3)The vehicle of railcar used to transport chemically treated metal shredder residue shall lack evidence of leakage, spillage, or damage that could cause releases under reasonably foreseeable conditions.
(4)The transporter of chemically treated metal shredder residue shall not transport chemically treated metal shredder residue to a place other than a landfill approved to receive chemically treated metal shredder residue, as described in subdivision (b).
(5)The chemically treated metal shredder residue is not held at any publicly accessible interim location for more than four hours, unless required by other provisions of law, before disposal.
(6)If an unauthorized release of chemically treated metal shredder residue occurs during transportation, the transporter shall immediately contain all releases of chemically treated metal shredder residue and residues from chemically treated metal shredder residue into the environment and determine whether any material resulting from that release is a hazardous waste and, if so, shall manage the hazardous waste in compliance with all applicable requirements of this division. The transporter of chemically treated metal shredder residue is considered the generator of any hazardous waste resulting from the release and is subject to the requirements of Chapter 12 (commencing with Section 66262.10) of Division 4.5 of Title 22 of the California Code of Regulations.
(d)Each shipment of chemically treated metal shredder residue shall be accompanied by a shipping document containing all of the following information:
(1)The quantity, by weight in short tons, of chemically treated metal shredder residue being transported.
(2)The name, physical and mailing addresses, and telephone number of the generating metal shredding facility.
(3)The name, physical and mailing addresses, and telephone number of the destination landfill.
(4)The date the shipment of chemically treated metal shredder residue leaves the metal shredding facility.
(5)The date the shipment of chemically treated metal shredder residue arrives at the destination landfill.
(6)The name and telephone number of the transporter who shipped the chemically treated metal shredder residue from the metal shredding facility to the destination landfill.
(e)The metal shredding facility shall retain onsite a copy of all documentation produced pursuant to this section for at least three years from the date that the chemically treated metal shredder residue that is the subject of the documentation was generated. The department may request the information identified in subdivision (d) in the form of a summary log or a copy of each individual shipping document. The three-year record retention period is automatically extended during the course of any unresolved enforcement action regarding chemically treated metal shredder residue management activity or as requested by the department.
(f)The generating metal shredding facility shall, on or before February 1 of the following year, submit to the department, at the address specified in subdivision (g) of this section, a written annual report containing all of the following information:
(1)The name, physical and mailing addresses, and telephone number of the generating metal shredding facility.
(2)The name, telephone number, and email address of the contact person at the generating metal shredding facility who should be contacted regarding management, transportation, and disposal of chemically treated metal shredder residue.
(3)The name, physical and mailing address, and telephone number for each of the landfills to which the generating metal shredding facility shipped chemically treated metal shredder residue during the previous calendar year.
(4)The total cumulative quantity of chemically treated metal shredder residue, by weight in short tons, shipped to all landfills, and the respective quantity of chemically treated metal shredder residue, by weight in short tons, shipped to each landfill, during the previous calendar year.
(5)The United States Environmental Protection Agency identification number of the generating metal shredding facility.
(g)The metal shredding facility shall provide a copy of any relevant document identified in subdivision (e) upon receipt of a request from the department. Annual reports submitted to the department pursuant to subdivision (f) shall be sent to the following address: Department of Toxic Substances Control, CTMSR Reporting Staff, P.O. Box 806, Sacramento, CA 95812-0806, with the words Attention: CTMSR Annual Report prominently displayed on the front of the envelope.
(h)The owner or operator of a metal shredding facility shall not be required to treat metal shredder residue and shall be exempt from this section if the owner or operator determines, as prescribed in Section 66262.11 of Title 22 of the California Code of Regulations, that the metal shredder residue generated at the facility does not exhibit any state or federal characteristics of hazardous waste, as prescribed in Chapter 11 (commencing with Section 66261.1) of Division 4.5 of Title 22 of the California Code of Regulations.
5.Reporting25095.30.(a)Except as otherwise provided in subdivision (c), within one year after the effective date, the owner or operator of a metal shredding facility shall conduct a preliminary endangerment assessment, as defined in Section 78095, and submit it to the department. The preliminary endangerment assessment shall be conducted in accordance with the most current department guidance manual for evaluating hazardous substance release sites and shall include an evaluation of process areas or locations where releases of materials containing hazardous constituents may have or have occurred, a conceptual site model, and site-specific human health and ecological screening evaluations.
(b)The owner or operator of a metal shredding facility shall conduct appropriate corrective action as needed to address releases of hazardous materials or wastes that pose a significant threat to human health or the environment. This subdivision does not prohibit the department from issuing a corrective action order under Section 25187 subsequent to any investigation of the metal shredding facility.
(c)The owner or operator of a metal shredding facility may demonstrate compliance with this section by providing evidence to the department that, within the last five years, the metal shredding facility has completed an assessment of the metal shredding facility pursuant to an order issued by the department, a regional water quality control board, or any other federal, state, or local agency and is implementing, or has implemented, any corrective action requirements imposed by the agency.
25095.31.(a)The owner or operator of a metal shredding facility shall provide the department with immediate notice of a fire or other incident at the metal shredding facility that requires the assistance of a local fire department or other first responder. This notice shall be in addition to any notice that is required to be made to the Office of Emergency Services pursuant to Section 66265.56 of Title 22 of the California Code of Regulations, the unified program agency, and any other agency under applicable law.
(b)The owner or operator of a metal shredding facility shall establish an effective means of providing public notice to members of the surrounding community upon the occurrence of a fire or other incident that poses a threat to human health or the environment outside of the facility as specified in Section 66265.56 of Title 22 of the California Code of Regulations.
(c)The department shall evaluate how to apply to metal shredding facilities its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations as described in subdivisions (b) and (c) of Section 25200.21.
25095.32.On or before July 1, 2030, the Board of Environmental Safety, at a specially scheduled public meeting, shall hear from the department and receive input from members of the public, metal shredding facilities, and other interested stakeholders on the implementation of this chapter. A notice announcing the proposed date, time, and location of the meeting shall be posted on the boards internet website at least 30 days before the meeting and may be changed by the board if an alternate meeting date or location is determined to be appropriate, which information shall be posted on the boards internet website at least 14 calendar days before the meeting. The board shall also allow remote participation in the meeting. Following the public meeting, the board shall provide the department with any recommendations regarding the implementation and administration of this chapter.
6.Closure25095.40.(a)The owner or operator of a metal shredding facility shall have a written closure plan.
(1)The written closure plan shall address all of the following:
(A)The closure and removal of all feedstock, metal shredder aggregate, and treated and untreated metal shredder residue.
(B)The decontamination of equipment and operating areas used for processing metal shredder aggregate.
(C)The treatment of metal shredder residue and management of chemically treated metal shredder residue.
(2)The written closure plan shall include all of the following:
(A)A description of how the equipment and areas used for processing metal shredder aggregate and for treating metal shredder residue will be closed. The description shall identify the maximum extent of the operation during the life of the equipment or area and how all of the following requirements will be met, if applicable:
(i)Section 66265.114 of Title 22 of the California Code of Regulations.
(ii)Subdivisions (a), (b), and paragraphs (1) and (2) of subdivision (c) of Section 66265.197 of Title 22 of the California Code of Regulations.
(iii)Section 66265.404 of Title 22 of the California Code of Regulations.
(B)An estimate of the maximum inventory of metal shredder aggregate and metal shredder residue in storage and in treatment at any time during the operation of the metal shredding facility.
(C)A description of the steps needed to remove or decontaminate an area, equipment, or structure during partial and final closure, including, but not limited to, procedures for cleaning equipment and removing contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required.
(D)An estimate of the expected year of closure and a schedule for final closure. The schedule for final closure shall include, at minimum, the total time required to close each authorized unit.
(3)The written closure plan shall be subject to approval by the department.
(4)An amendment to the written closure plan shall be done in compliance with subdivision (c) of Section 66265.112 of Title 22 of the California Code of Regulations.
(b)The metal shredder facility shall maintain compliance with both of the following requirements regarding closure:
(1)Subdivisions (a) and (b) of Section 66265.111 of Title 22 of the California Code of Regulations, in the same manner as those provisions apply to metal shredding facilities.
(2)Section 66265.114 of Title 22 of the California Code of Regulations.
(c)Within 90 days after processing the final volume of metal shredder aggregate, the owner or operator shall commence closure of the metal shredding facility in accordance with the written closure plan.
(d)The owner or operator shall complete closure activities in accordance with the written closure plan within 180 days after processing the final volume of metal shredder aggregate unless the owner or operator demonstrates to the department any of the following:
(1)The activities required to complete the closure will require longer than 180 days to complete.
(2)The facility has the capacity to process additional metal shredder aggregate.
(3)There is a reasonable likelihood that a person other than the owner or operator will recommence operation of a unit, the equipment or area, closure of the equipment and area would be incompatible with the operation of the metal shredding facility, and the owner or operator has taken and will continue to take all steps necessary to prevent threats to human health and the environment.
(e)The owner or operator shall notify the department and any other agencies having jurisdiction over the closure project at least 15 days before completion of closure.
(f)The owner or operator shall remain in compliance with all applicable requirements of this chapter until the owner or operator submits to the department or authorized agency a certification signed by the owner or operator and by an independent, professional engineer registered in California that closure has been completed in accordance with the written closure plan and that the written closure plan meets or exceeds the applicable requirements of this chapter.
25095.41.(a)The owner or operator shall provide a closure cost estimate to the department consistent with Section 66265.142 of Title 22 of the California Code of Regulations and based on all of the following factors:
(1)The cost of transporting any unprocessed metal shredder aggregate and metal shredder residue to another metal shredding facility for processing or disposal.
(2)The cost of decontaminating all areas and equipment used for storage and processing of metal shredder aggregate.
(3)The cost of decontaminating all areas and equipment used for treatment and storage of treated or untreated metal shredder residue.
(4)The cost for all closure sampling and analysis confirming decontamination sufficiently meets closure performance standards.
(5)The cost of disposition of the maximum amount of metal shredder aggregate and metal shredder residue that may be present at the metal shredding facility at the time of closure.
(6)The cost of closure certification.
(b)For the purpose of calculating the closure cost estimate, the owner or operator may apply the fair market value of any remaining feedstock and metal shredder aggregate against the estimated cost of closure. In addition, the owner or operator may take into consideration metal shredding facility structures, equipment, and other assets that may continue to be used, sold to third parties, or salvaged for scrap value. The closure cost estimate shall also be determined based on the site-specific aspects of the metal shredding facility, including, without limitation, those site-specific aspects specified in Section 25095.40.
(c)The owner or operator shall provide a financial assurance mechanism for closure of the metal shredding facility using one or more of the financial mechanisms described in Section 66265.143 of Title 22 of the California Code of Regulations.
(d)The owner or operator shall provide a financial assurance mechanism for bodily injury and property damage to third parties caused by sudden accidental occurrences arising from operations of the metal shredding facility. The owner or operator shall have and maintain liability coverage for sudden accidental occurrences in the amount of at least one million dollars ($1,000,000) per occurrence with an annual aggregate of at least two million dollars ($2,000,000), exclusive of legal defense costs. The owner or operator may satisfy the requirements of this subdivision through a financial mechanism identified in Section 66265.147 of Title 22 of the California Code of Regulations.
(e)If the facility is required to implement postclosure care following closure of the facility, the owner or operator shall provide a financial assurance mechanism for postclosure using one or more of the financial mechanisms described in Section 66265.145 of Title 22 of the California Code of Regulations.
7.Fees25095.50.(a)The following definitions shall apply for purposes of this article:
(1)Fee rate means the rate to be set by the department for the 202728 fiscal year, as annually adjusted by the Board of Environmental Safety beginning in the 202829 fiscal year and thereafter pursuant to subdivision (b).
(2)Fee schedule means the fee structure established in regulations by the department pursuant to subdivision (b) using the criteria in subdivision (c).
(b)(1)Beginning in the 202829 fiscal year, the rates established by the department shall be reviewed and shall be increased or decreased annually by the Board of Environmental Safety as necessary and shall provide for the assessment of no more than the reasonable and necessary costs of the department, the Board of Environmental Safety, and the Office of Environmental Health Hazard Assessment to implement this chapter as described in this section.
(2)The department shall collect an annual fee on all metal shredding facilities that are subject to the requirements of this chapter. The department shall establish and adopt regulations to administer this fee and to establish a fee schedule and rate that is sufficient to cover the departments reasonable costs to implement this chapter and Sections 25150.87 and 41514.6, excluding the costs described in Section 25095.51.
(3)The fee rate shall include, but not be limited to, the costs of fee administration, the costs of collection of the fee, the departments administrative costs, and statewide general administrative costs related to implementation of this chapter and Sections 25150.87 and 41514.6.
(4)The fee rate shall allow for a reserve in the fund each year at an amount sufficient to ensure that all programs funded by the subaccount will not be adversely affected by revenue shortfalls or baseline expenditure adjustments and does not exceed 10 percent of the authorized expenditure levels.
(5)The fees established pursuant to this section shall also be sufficient to cover the Office of Environmental Health Hazard Assessments reasonable costs to implement Sections 25150.87 and 41514.6.
(6)The fees established pursuant to this section shall also be sufficient to cover the reasonable costs incurred by the Board of Environmental Safety in the administration and implementation of its duties and responsibilities established by this chapter.
(c)In establishing a fee schedule that may be imposed on a metal shredding facility pursuant to this section, the department shall consider, but is not limited to considering, all of the following factors as they relate to the departments reasonable oversight costs:
(1)The facility-specific permit conditions, if any, developed pursuant to paragraph (5) of subdivision (b) of Section 25095.10.
(2)The size of the facility.
(3)The volume of feedstock that is shredded on an annual basis.
(4)The types of feedstock that are shredded at the facility.
(5)The nature of metal processing operations occurring at the facility, including the types of machinery used.
(6)Whether the facility conducts chemical stabilization of metal shredder residue.
(d)The Controller shall establish a new and separate Metal Shredding Facility Subaccount in the Hazardous Waste Control Account. The Metal Shredding Facility Subaccount shall be administered by the Director of Toxic Substances Control. The fees collected pursuant to this section shall be deposited into the Metal Shredding Facility Subaccount and be available for expenditure by the department, the Board of Environmental Safety, and the Office of Environmental Health Hazard Assessment, upon appropriation by the Legislature, solely for the purpose of implementation and administration of their respective duties pursuant to this chapter and Sections 25150.87 and 41514.6. The Director of Finance, upon request of the Director of Toxic Substances Control, may make a loan from the General Fund to the Metal Shredding Facility Subaccount to meet cash needs. The loan shall be subject to the repayment provisions of Section 16351 of the Government Code and the interest provisions of Section 16314 of the Government Code.
(e)(1)A regulation adopted pursuant to this section may be adopted as an emergency regulation in accordance with Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, and, for purposes of that chapter, including Section 11349.6 of the Government Code, the adoption of these regulations is an emergency and shall be considered by the Office of Administrative Law as necessary for the immediate preservation of the public peace, health, safety, and general welfare. Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, an emergency regulation adopted by the department or the Board of Environmental Safety pursuant to this section shall be filed with, but not be repealed by, the Office of Administrative Law and shall remain in effect for a period of two years or until revised by the department or the Board of Environmental Safety, whichever occurs sooner.
(2)Before adopting a regulation pursuant to this section, the department shall hold at least two public hearings regarding the proposed regulation, including one public hearing dedicated to assessing the impact of the proposed regulation on small metal shredding facilities as defined in this chapter.
(f)(1)A metal shredding facility paying an annual fee in accordance with this section is not subject to any of the following fees set forth in Chapter 6.5 (commencing with Section 25100), with respect to the production, transportation, and processing of metal shredder aggregate, the generation, handling, and management, transportation, and disposal of nonhazardous metal shredder residue:
(A)A fee imposed pursuant to Section 25205.7.
(B)A facility fee imposed pursuant to Section 25205.2.
(C)A fee imposed pursuant to Section 25205.5.
(2)A metal shredding facility is subject to the fees listed in paragraph (1) for any hazardous waste generated and handled by the metal shredding facility that are ancillary to metal processing operations at the metal shredding facility.
(g)The requirements and procedures in Article 2 (commencing with Section 43471) of Chapter 5 of Part 22 of Division 2 of the Revenue and Taxation Code, excluding Section 43478 of that article, shall apply to the fees paid pursuant to this section and to any claim for refund of fees alleged to have been erroneously or illegally assessed or collected, and any reference to the board or the California Department of Tax and Fee Administration in that article shall instead refer to the department. Any regulations adopted by the department to implement this section shall be consistent with those requirements and procedures.
25095.51.(a)(1)(A)A person who applies for a metal shredding facility permit under this chapter shall enter into a written agreement with the department pursuant to which that person shall reimburse the department for the direct costs reasonably incurred by the department in processing the permit application. The fee amount to be reimbursed by the applicant shall cover the departments costs for review of the permit application, the conduct of public meetings and notices associated with the permit process, and preparation of the permit.
(B)The fee described in subparagraph (A) shall be in addition to and separate from the annual fee assessed pursuant to Section 25095.50.
(2)An agreement required pursuant to paragraph (1) shall provide for a 25-percent deposit to be made with the submittal of the application. The 25-percent advance payment shall be based upon the departments total estimated costs of processing the application.
(b)(1)Pursuant to Section 21089 of the Public Resources Code, an applicant for a metal shredding facility permit shall also pay all costs incurred by the department for purposes of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), in conjunction with the application.
(2)Paragraph (1) does not apply to projects that are exempt from CEQA.
(c)Funds received pursuant to this section shall be placed in the Metal Shredding Facility Subaccount specified in subdivision (d) of Section 25095.50 and be available for expenditure by the department, upon appropriation by the Legislature, solely for the purposes of implementation and administration of this chapter and Sections 25150.87 and 41514.6.
8.Enforcement25095.60.(a)(1)The authority granted to the department in Article 8 (commencing with Section 25180) of Chapter 6.5 and implementing regulations set forth in Article 3 (commencing with Section 25095.10) of Chapter 22 of Division 4.5 of Title 22 of the California Code of Regulations may be used to enforce this chapter, including, but not limited to, the authority to conduct inspections and pursue administrative or judicial enforcement for violations of this chapter and any implementing regulations, to suspend the authorization of any metal shredding facility that has been determined based on substantial evidence to pose an imminent and substantial endangerment to human health or the environment, and to deny an application for a permit for any of the reasons set forth in paragraph (1) of subdivision (a) of Section 25095.61. These enforcement mechanisms shall apply to violations of this chapter relating to the management of materials listed in subdivision (a) of Sections 25095.20 and 25095.21. Except as provided in paragraph (2), the department shall exercise its enforcement authority under this article in response to any violation of this chapter or of the terms and conditions of a permit issued pursuant to this chapter, and all such enforcement actions shall be deemed to arise under this chapter.
(2)The department has the authority to pursue enforcement under Chapter 6.5 (commencing with Section 25100) for the following violations:
(A)For the operation of a metal shredding facility without having timely submitted a notice of intent and associated operating plans and other information required by paragraph (2) of subdivision (b) of Section 25095.10.
(B)For the operation of a metal shredding facility after a final decision by the department denying or revoking a permit pursuant to this chapter.
(C)For any offsite release of materials listed in Sections 25095.20 and 25095.21 if they meet the criteria of a hazardous waste pursuant to Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations.
(b)(1)The department may order the temporary cessation of shredder operations and may prohibit the receipt of additional shredder feedstock by the facility, if the owner or operator fails to develop and implement a fire response plan as required by paragraphs (1) and (2) of subdivision (b) of Section 25095.13. The owner or operator may resume shredder operations and receipt of feedstock immediately upon providing written confirmation to the department that the facility is operating in accordance with a fire response plan.
(2)The department may prohibit the receipt of shredder feedstock at a metal shredding facility on a temporary basis if the owner or operator exceeds the limitations relating to pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13. So long as the owner or operator of the facility has developed and is implementing a fire response plan, the facility may continue to conduct metal shredding operations and metal processing operations to reduce the inventory of shredder feedstock or metal shredder aggregate, as appropriate, and may resume receipt of feedstock at the facility immediately upon providing written confirmation to the department compliance with the limitations on pile size and duration have been achieved.
(c)The department shall conduct an annual compliance evaluation inspection of each metal shredding facility regulated under this chapter. The unified program agency or local environmental health official shall be allowed to participate in the inspection.
25095.61.(a)(1)The department may deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility under this chapter. A denial, revocation, or suspension shall be based on at least one of the following:
(A)Noncompliance with a condition of the applicable permit that results in a significant threat to human health or the environment.
(B)An owner or operators failure in the application or during the approval process to disclose fully all relevant facts or a misrepresentation of any relevant fact at any time.
(C)A determination, supported by substantial evidence, that the permitted activity poses a danger to human health or the environment that can only be addressed by permit denial, modification, suspension, or revocation. In such situations, the department shall either deny, modify, suspend, or revoke a permit. Any modifications made by the department shall be consistent with and necessary to ensure compliance with the requirements of this chapter.
(D)Any cause specified in Section 25186.
(2)The department shall provide notice of any adverse action it proposes to be taken to the owner or operator of the metal shredding facility by certified mail with return receipt requested or by personal service.
(3)An owner or operator who wishes to appeal that adverse action shall appeal by submitting a letter to the department, within 10 days of receipt of notice of the adverse action and requesting a hearing.
(4)Except as provided in paragraph (5), proceedings to appeal any decision made by the department under this chapter, including without limitation required modifications to any plan or other information submitted pursuant to Section 25095.10 and the imposition of site-specific conditions or other operating requirements applicable to a metal shredding facility, shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code. Before initiating an appeal, the owner or operator of a facility shall meet and confer with the department in a good faith effort to resolve the dispute.
(5)Proceedings to appeal the departments decision concerning the denial, modification, revocation or suspension of a permit to operate a metal shredding facility pursuant to this chapter shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code.
(6)Any person who submitted written comments on the draft permit may file an appeal of the departments final permit decision with the Office of Administrative Hearings, pursuant to Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code. An appeal filed pursuant to this paragraph shall be limited to those conditions of the final permit that were included in the persons written comments to the department during the public comment period.
(b)An authorization to operate pursuant to this chapter is contingent upon the accuracy of information contained in the notifications and other documents required to be maintained.
(c)(1)The department shall have primary responsibility for enforcement of the terms of this chapter and may refer violations of this chapter to a district attorney or the Attorney General for prosecution. Notwithstanding this authority, a city attorney, county counsel, district attorney, or the Attorney General may maintain a civil or criminal prosecution consistent with their authority. In addition, nothing in this chapter, and no action taken by the department pursuant to this chapter, shall be construed as a limitation on the right of any person to maintain any civil action otherwise authorized by law.
(2)The department shall inform the local health officer and the director of environmental health of a county, city, or district, and the unified program agency for the jurisdiction, of any unlawful disposal of materials that are regulated under Section 25095.20 or 25095.21 of this chapter, and of any enforcement action undertaken against a metal shredding facility within the unified program agencys jurisdiction as a result of that unlawful disposal. Notice shall be provided within 15 days after the department becomes aware of the violation, and the department shall coordinate with the unified program agency regarding the violation.
25095.62.(a)The department shall deposit all penalties collected pursuant to this chapter into the Toxic Substances Control Account.
(b)Upon appropriation, the funds collected pursuant to subdivision (a) shall be used for the purposes described in Section 25173.6.
SEC. 2.Section 25117 of the Health and Safety Code is amended to read:25117.(a)Except as provided in subdivision (d), hazardous waste means a waste that meets any of the criteria for the identification of a hazardous waste adopted by the department pursuant to Section 25141.
(b)Hazardous waste includes, but is not limited to, RCRA hazardous waste.
(c)Unless expressly provided otherwise, hazardous waste also includes extremely hazardous waste and acutely hazardous waste.
(d)Hazardous waste does not include a material that is not waste pursuant to Section 25095.20 or hazardous waste pursuant to Section 25095.21.
(e)Notwithstanding subdivision (a), in any criminal or civil prosecution brought by a city attorney, county counsel, district attorney, or the Attorney General for violation of this chapter, when it is an element of proof that the person knew or reasonably should have known of the violation, or violated the chapter willfully or with reckless disregard for the risk, or acted intentionally or negligently, the element of proof that the waste is hazardous waste may be satisfied by demonstrating that the waste exhibited the characteristics set forth in subdivision (b) of Section 25141.
SEC. 3.Section 25150.82 of the Health and Safety Code is repealed.SEC. 4.Section 25150.84 of the Health and Safety Code is amended to read:25150.84.(a)The department shall collect an annual fee from all metal shredding facilities that are subject to the requirements of this chapter or to the alternative management standards adopted pursuant to Section 25150.82. The department shall establish and adopt regulations necessary to administer this fee and to establish a fee schedule that is set at a rate sufficient to reimburse the costs of the department and the Office of Environmental Health Hazard Assessment to implement this chapter and Section 41514.6, as applicable to metal shredding facilities. The fee schedule established by the department may be updated periodically as necessary and shall provide for the assessment of no more than the reasonable and necessary costs of the department and the Office of Environmental Health Hazard Assessment to implement this chapter and Section 41514.6, as applicable to metal shredding facilities.
(b)The Controller shall establish a separate subaccount in the Hazardous Waste Control Account. The fees collected pursuant to this section shall be deposited into the subaccount and be available for expenditure by the department or Office of Environmental Health Hazard Assessment upon appropriation by the Legislature.
(c)A regulation adopted pursuant to this section may be adopted as an emergency regulation in accordance with Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, and for the purposes of that chapter, including Section 11349.6 of the Government Code, the adoption of these regulations is an emergency and shall be considered by the Office of Administrative Law as necessary for the immediate preservation of the public peace, health, safety, and general welfare. Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, an emergency regulation adopted by the department pursuant to this section shall be filed with, but not be repealed by, the Office of Administrative Law and shall remain in effect for a period of two years or until revised by the department, whichever occurs sooner.
(d)(1)A metal shredding facility paying an annual fee in accordance with this section shall be exempt from the following fees as the fees pertain to metal shredding activities and the generation, handling, management, transportation, and disposal of metal shredder waste:
(A)A fee imposed pursuant to Section 25205.7.
(B)A disposal fee imposed pursuant to Section 25174.1 until July 1, 2022.
(C)A facility fee imposed pursuant to Section 25205.2.
(D)A fee imposed pursuant to Section 25205.5.
(E)A transportable treatment unit fee imposed pursuant to Section 25205.14 until July 1, 2022, and Section 25205.2 on and after July 1, 2022.
(2)A metal shredding facility is not exempt from the fees listed in paragraph (1) for any other hazardous waste the metal shredding facility generates and handles.
(e)This section shall become inoperative on July 1, 2027, and, as of January 1, 2028, is repealed.
SEC. 5.Section 25150.86 of the Health and Safety Code is repealed.SEC. 6.Section 25150.87 of the Health and Safety Code is amended to read:25150.87.(a)(1)The department shall require metal shredding facilities, as defined in Section 25095.1, that are subject to Section 41514.6 and this section, to do both of the following:
(A)Monitor hazardous waste constituents requested by the department.
(B)Report the results of the monitoring required pursuant to subparagraph (A) to the department. The facilities may also report those results to the local public health department.
(2)The department shall collect and analyze light fibrous material at the fence lines to determine the potential for release of hazardous waste.
(b)All metal shredding facilities subject to this section shall implement the facilitywide fence-line hazardous waste constituent monitoring requirements developed pursuant to this section.
(c)On or before July 1, 2027, the department shall develop a procedure for community notification of the public for the area in which the metal shredding facility is located, if monitoring pursuant to paragraph (1) of subdivision (a) indicates any release of light fibrous material.
(d)On or before January 1, 2027, the department shall develop regulations to implement, interpret, or make specific this section.
(e)The department shall oversee and enforce the implementation of subdivision (a) pursuant to Article 8 (commencing with Section 25180).
(f)Any reasonable regulatory costs incurred by the department in implementing this section may be reimbursed by the fee on metal shredding facilities imposed pursuant to subdivision (a) of Section 25095.50.
SEC. 7.Section 41514.6 of the Health and Safety Code is amended to read:41514.6.(a)On or before January 1, 2027, a district the jurisdiction of which includes metal shredding facilities, in consultation with the Department of Toxic Substances Control and the Office of Environmental Health Hazard Assessment, shall develop requirements for facilitywide fence-line air quality monitoring at metal shredding facilities, as defined in Section 25095.1, that are subject to Section 25095.50 and this section.
(b)The requirements developed pursuant to subdivision (a) shall include, but not be limited to, all of the following:
(1)Development of threshold levels, in consultation with the Office of Environmental Health Hazard Assessment, for airborne contaminants, including, but not limited to, lead, zinc, cadmium, and nickel, at the fence lines of metal shredding facilities that are protective of air quality and public health. The threshold levels shall follow health guidance values adopted by the Office of Environmental Health Hazard Assessment, if available.
(2)Development of threshold levels for community notification of potential adverse impact on public health based on the threshold values developed pursuant to paragraph (1).
(3)Development of actions, in consultation with the Department of Toxic Substances Control, to be taken by metal shredding facilities if threshold levels developed pursuant to paragraph (1) are exceeded, and a method of enforcing those actions.
(4)Development of community notification procedures to inform the public in areas in which the metal shredding facility is located, if the monitoring required pursuant to this subdivision indicates the threshold levels developed pursuant to paragraph (2) were exceeded.
(5)Reporting the results of the monitoring required pursuant to this subdivision to the district and the local public health department.
(c)All metal shredding facilities subject to this section shall implement the facilitywide fence-line air quality monitoring developed pursuant to this section.
(d)On or before July 1, 2027, a district the jurisdiction of which includes metal shredding facilities shall adopt regulations to implement, interpret, or make specific the requirements pursuant to this section.
(e)A district the jurisdiction of which includes metal shredding facilities shall oversee and enforce the compliance of metal shredding facilities with regulations adopted pursuant to subdivision (d).
(f)Any reasonable regulatory costs incurred by a district in implementing this section may be reimbursed pursuant to its fee authority.
(g)The Office of Environmental Health Hazard Assessments costs to implement this section shall be reimbursed from the subaccount established in the Hazardous Waste Control Account pursuant to Section 25095.50.
SEC. 8.The Legislature finds and declares that metal shredding facilities are essential to a thriving circular economy in the State of California and the regulation of those facilities is a matter of statewide concern and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 1 of this act adding Chapter 6.4 (commencing with Section 25095) to Division 20 of the Health and Safety Code applies to all cities, including charter cities.
SEC. 9.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)Metal shredding facilities are essential to a thriving circular economy in the State of California because they provide an efficient, reliable, and effective means of recycling the millions of tons of recyclable metal, including end-of-life vehicles and household appliances, that are generated annually in the state.
(2)Metal shredding facilities enable the recycling of end-of-life metal products and other metal-containing materials by reducing them in size and facilitating the recovery of ferrous and nonferrous metals and other recyclable commodities. These activities conserve energy and natural resources and support the states goal of reducing the emissions of greenhouse gases and combating climate change.
(3)Metal shredding facilities differ in important respects from waste management facilities. For this reason, regulation and oversight of metal shredding facilities are most appropriately addressed through requirements that are specific to the metal shredding industry, and to individual facilities based on their size and nature of operations, while fully protecting human health and the environment.
(4)The purpose of this chapter is to establish operating standards and other requirements applicable to metal shredding facilities and to resolve ongoing legal disputes over the regulatory status of metal shredding facilities that operate in the state. The department, the metal shredding industry, and neighboring communities would all benefit from clear, enforceable requirements to govern oversight of metal shredding facilities and their operations and to proactively protect public health and the environment.
(5)Metal shredding operations have the potential to release hazardous materials and impact neighboring communities and the environment if the materials are not properly managed.
(6)This chapter does not alter or override the authority of any other federal, state, or local agency with jurisdiction to regulate the activities of a metal shredding facility in accordance with any other applicable law.
(7)This chapter does not impair the rights of any person under any state or federal law.
(b)It is the intent of the Legislature that this chapter be implemented in a manner that achieves all of the following:
(1)Promotes the economic viability of all metal shredding facilities, regardless of size, so as to ensure the continued capacity of the state to manage the large volume of scrap metal that is produced in California every year.
(2)Protects public health and the environment and all communities, including those that have been designated as disadvantaged or vulnerable pursuant to state law.
(3)Does not cause disproportionate and potentially discriminatory impacts on local communities, consistent with Title VI of the federal Civil Rights Act of 1964 (Public Law 88-352) and Section 11135 of the Government Code.
(c)It is the intent of the Legislature that metal shredding facilities be regulated pursuant to this chapter and not Chapter 6.5 (commencing with Section 25100).
2.Definitions and General Provisions25095.1.For purposes of this chapter, the following definitions apply:
(a)Chemically treated metal shredder residue or CTMSR means the waste generated from the processing of shredded metallic materials, which may include, but is not limited to, end-of-life vehicles, appliances, and other metal-containing items, by a metal shredding facility where recoverable ferrous or nonferrous metals have been removed and the remaining metal shredder residue has been treated by a waste stabilization process, as described in this chapter.
(b)Corrective action means all actions necessary to mitigate any public health or environmental threat resulting from a release into the environment of hazardous substances from an operating or closed metal shredding facility and to restore the environmental conditions as necessary to protect human health and the environment.
(c)Department means the Department of Toxic Substances Control.
(d)Effective date means the date that this chapter becomes operative.
(e)Existing metal shredding facility means a metal shredding facility that is conducting metal shredding and metal processing operations as of the date that the act adding this chapter is signed into law by the Governor.
(f)Feeder yard means a metal recycling facility that collects, sorts, or processes scrap metal, through means other than the use of a hammer mill, from which scrap metal is sold to customers or transferred to a metal shredding facility for further processing and recycling.
(g)Feedstock means material received by a metal shredding facility before shredding and processing, including, but not limited to, end-of-life vehicles, household appliances, or other forms of light gauge metal suitable for processing in a metal shredder. Feedstock is often referred to as light iron or tin.
(h)Light fibrous material means a fibrous mixture of nonmetallic materials, including, but not limited to, synthetic fabric and carpet fibers, and entrained metallic particles, often representing the lightest fraction of metal shredder aggregate produced from the shredding of end-of-life vehicles and other metallic items, that is susceptible to dispersal into the environment.
(i)Metal processing operations means the stockpiling and handling of metal shredder aggregate, the operations undertaken to separate, sort, and remove ferrous or nonferrous scrap metal from metal shredder aggregate, and the treatment and storage of metal shredder residue. Metal processing operations does not include shredding, crushing, baling, shearing, cutting, or other metal recycling operations unrelated to the handling of metal shredder aggregate.
(j)Metal products means all ferrous and nonferrous metals that have been removed from metal shredder aggregate or from metal shredder residue.
(k)Metal shredder aggregate means the mixture of shredded metallic and nonmetallic materials that is produced by the shredding of metallic feedstock and that is subsequently processed for the purpose of separating, sorting, and removing ferrous metals, nonferrous metals, or other recyclable commodities from nonrecyclable materials. Metal shredder aggregate does not include (1) metals that have been removed from metal shredder aggregate, or (2) metal shredder residue. Metal shredder aggregate is an in-process material and is not a waste or a hazardous waste.
(l)Metal shredder residue means waste comprising shredded plastics, rubber, glass, foam, fabric, carpet, wood, dirt, or other debris, that remains after recoverable ferrous and nonferrous metals or other recyclable commodities have been separated and removed from metal shredder aggregate. Metal shredder residue does not include chemically treated metal shredder residue.
(m)Metal shredding facility means the entire site under the control of the owner or operator of a facility that uses a stationary or mobile shredder, such as a hammer mill or other shredding technique, to process end-of-life vehicles, appliances, or other metallic feedstock materials in order to facilitate the separation, sorting, or removal of recoverable ferrous or nonferrous metals from nonrecyclable materials. Metal shredding facility does not include a feeder yard or other scrap metal recycling facility that operates a metal crusher, a metal shear, or a metal baler if that facility does not conduct metal shredding operations.
(n)New metal shredding facility means a metal shredding facility that had not commenced metal shredding and metal processing operations as of the effective date.
(o)Operator means the person responsible for the overall operation and management of a metal shredding facility.
(p)Owner means a person who owns a metal shredding facility in whole or in part.
(q)Person means any of the following:
(1)An individual, trust, firm, joint stock company, business concern, partnership, limited liability company, association, or corporation, including, but not limited to, a governmental corporation.
(2)A city, county, district, commission, the state, and any department, agency, or political subdivision thereof.
(3)An interstate body.
(4)The federal government and any department or agency thereof, to the extent permitted by law.
(r)Scrap metal has the same meaning as provided in Section 66260.10 of Title 22 of the California Code of Regulations.
(s)Small metal shredding facility means a facility that processes no more than 250 tons per day or 65,000 tons per year of metallic feedstock materials using a stationary hammer mill and meets each of the following conditions:
(1)The facility does not shred whole end-of-life vehicles, whole agricultural equipment, or whole white goods.
(2)The facility does not conduct on-site chemical treatment of metal shredder residue.
(3)The facility does not conduct any activity that requires the use of an on-site thermal oxidizer.
25095.2.The following facilities are not subject to this chapter:
(a)Facilities that shred only e-waste subject to regulation under Chapter 23 (commencing with Section 66273.1) of Division 4.5 of Title 22 of the California Code of Regulations.
(b)Facilities that shred wood or wood products that may contain ancillary metal components, including, but not limited to, screws, bolts, metal ties, and metal strapping.
(c)Facilities that shred only automotive tires.
(d)A feeder yard or other scrap metal recycling facility that operates a metal crusher, metal shear, or metal baler if that facility does not conduct metal shredding operations.
(e)A metal shredding facility that processes exclusively nonferrous metals that do not contain any nonmetallic materials and whose operations do not produce any metal shredder aggregate or result in the generation of metal shredder residue.
25095.3.Metal shredding facilities that are subject to regulation and comply with this chapter are not hazardous waste facilities. However, this chapter does not alter or override the authority of the department or a unified program agency, as defined in Section 25404, to regulate hazardous waste generated at a metal shredding facility in accordance with Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations.
25095.4.(a)On the effective date, the departments Official Policy and Procedure 88-6, titled Auto Shredder Waste Policy and Procedures dated November 21, 1988, is hereby repealed.
(b)On the effective date, any nonhazardous waste determination issued by the department or its predecessor, the State Department of Health Services, to any metal shredding facility pursuant to Section 66260.200(f) of Title 22 of the California Code of Regulations is hereby repealed.
25095.5.A citation or reference in this chapter to a requirement of the regulations in Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations or to a specific provision of Chapter 6.5 (commencing with Section 25100) relating to hazardous waste shall be understood to apply the technical requirements of those regulations or standards to metal processing operations authorized pursuant to this chapter and to the materials processed by those operations, notwithstanding the exclusion of those materials from the definitions of waste and hazardous waste established by this chapter. All citations or references to those requirements shall be to the provision as it read on the effective date.
25095.6.This chapter does not limit the authority of a local air pollution control district or air quality management district, as defined in Section 39025, or the authority of a unified program agency, as defined in Section 25404, or the authority of a local environmental health department that is not a unified program agency to regulate any activity at a metal shredding facility that falls within the scope of the agencys jurisdiction under existing law.
25095.7.The department may adopt regulations as necessary to implement this chapter, and thereafter may update and revise the regulations from time to time, consistent with this chapter. The department shall adopt regulations to implement Section 25095.50, relating to the imposition of fees on metal shredding facilities.
25095.8.Except as otherwise expressly defined or provided in this chapter or regulations implementing this chapter, all terms in this chapter that are defined in Article 2 (commencing with Section 25110) of Chapter 6.5 or its implementing regulations shall have the meaning provided in Article 2 (commencing with Section 25110) of Chapter 6.5 and its implementing regulations.
3.Permits and Operations25095.10.(a)(1)Except as provided in paragraph (2), a metal shredding facility shall not operate in California, unless it has a permit issued by the department.
(2)On and after the effective date, an existing metal shredding facility operating in compliance with the requirements of this chapter, including the provisions of a compliance plan approved by the department pursuant to subdivision (a) of Section 25095.11 and the schedule for any interim measures or controls issued pursuant to subdivision (i) of Section 25095.11, may continue to operate pending final action on a permit application as specified in this section. Without exception, the facility shall have developed and shall continuously implement a fire prevention, detection, and response plan and comply with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13. Except as provided in this section, nothing herein shall prevent the department from taking enforcement action pursuant to Article 8 (commencing with Section 25095.60) before issuance of a final permit.
(3)Any permit approved by the department pursuant to this chapter shall include a reference to all permits issued to the facility by other environmental regulatory agencies. Any action taken by the department pursuant to this chapter shall be consistent with the requirements imposed by those regulatory agencies. The department shall evaluate how to apply to metal shredding facilities its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations as described in subdivisions (b) and (c) of Section 25200.21.
(4)(A)Any permit action shall consider the conclusions and recommendations set forth in a community emissions reduction program prepared pursuant to Section 44391.2 and any other health risk assessment conducted by a local air district pursuant to the Air Toxics Hot Spots Information and Assessment Act of 1987 (Part 6 (commencing with Section 44300) of Division 26) or other applicable law. If an air quality health risk assessment has not been conducted, the owner or operator of the facility shall conduct an analysis of equivalent scope and depth as approved by the local air district.
(B)Before taking final action to issue a permit for a metal shredding facility under this chapter, the department shall determine on the basis of substantial evidence that operation of the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities.
(5)Each permit issued under this chapter shall set forth inspection, entry, monitoring, compliance certification, and reporting requirements to assure compliance with the permit terms and conditions. Any report required to be submitted by a metal shredding facility pursuant to a permit issued under this chapter shall be signed by the owner or operator and shall be certified under penalty of law in the manner specified in Section 66270.11 of Title 22 of the California Code of Regulations.
(b)(1)A person who submitted a hazardous waste facility permit application pursuant to Chapter 6.5 (commencing with Section 25100) to treat metal shredder residue before the effective date may withdraw that application and conduct those treatment operations pursuant to this chapter.
(2)Within 30 days of the effective date, the owner or operator of an existing metal shredding facility shall submit a notice of intent to apply for a permit. Thereafter, the owner or operator of an existing metal shredding facility shall apply to the department for a permit pursuant to this chapter no later than six months following submittal of the notice of intent, except a small metal shredding facility shall apply for a permit no later than one year following submittal of the notice of intent. In all cases, the application shall include all of the following information:
(A)A description of the metal processing operations conducted at the metal shredding facility, including all equipment used for this purpose.
(B)A metal shredding facility inspection plan, as specified in paragraph (3) of subdivision (a) of Section 25095.13, including, without limitation, inspection of the area surrounding the hammer mill and all downstream metal processing equipment where light fibrous material is likely to accumulate.
(C)A plan for the prevention, detection, and response to fires that includes, at a minimum, provisions for the continuous monitoring of stockpiles of shredder feedstock and metal shredder aggregate for increases in temperature, periodic fire patrols, regular watering of feedstock and aggregate piles, availability of adequate water supplies, water pressure and fire-fighting equipment at the facility, maintenance of fire lanes, and operator training in fire prevention, detection, and response.
(D)A closure plan.
(E)A metal shredding facility housekeeping plan that includes, but is not limited to, daily cleanup of light fibrous material that is susceptible to dispersal beyond the hammer mill.
(F)An inventory management plan that includes procedures that will be implemented to ensure compliance with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13.
(G)A facility security plan consistent with the requirements of Section 66265.14 of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(H)A preparedness and prevention plan consistent with the requirements of Article 3 (commencing with Section 66265.30) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(I)A contingency plan consistent with the requirements of Article 4 (commencing with Section 66265.50) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(J)A flood plain map, if applicable.
(K)Evidence of financial assurance for closure and third-party liability consistent with the requirements of Article 8 (commencing with Section 66265.140) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(L)A plan describing any offsite or out-of-state transportation and processing of metal shredder aggregate, including, but not limited to, the estimated amount of material that is transported, the identity and federal Standard Industrial Classification code of the receiving facility, the estimated amounts of metals that are recovered from the material that is transported offsite, the required insurance, and any other information requested by the department to evaluate whether metal recycling operations are being conducted at the receiving facility.
(M)A compliance plan and schedule if required pursuant to subdivision (a) of Section 25095.11.
(N)A training plan that addresses each of the following areas:
(i)Prevention of releases of metal shredder aggregate, including light fibrous material, and metal shredder residue.
(ii)Fire prevention, detection, and suppression.
(iii)Response to natural disasters, such as earthquakes, wildfires, and floods.
(iv)Emergency response procedures and notification.
(v)Inventory management.
(3)The department shall post all information provided by the owner or operator of a metal shredding facility pursuant to paragraph (2) on the departments internet website in a manner that is readily accessible to the public, consistent with exceptions or exemptions under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
(4)The department shall review the permit application submitted pursuant to paragraph (2) as expeditiously as possible and shall take final action to approve, modify, or deny the application within three years after the application has been determined to be complete. For purposes of this subdivision, the department shall consider an application to be complete if it includes each of the plans and other information specified in subdivision (a). Failure of the owner or operator to provide a complete permit application within one year shall be grounds for the department to initiate denial of the application, subject to the following:
(A)The three-year period for review of an application may be extended as necessary for completion of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) process.
(B)If the department does not complete the permit process and issue the permit within three years, the department shall provide written notice to the public, setting forth an explanation for the delay, and shall conduct a public meeting upon request.
(C)If the owner or operator of a facility has timely submitted a complete application and responded to any additional requests for information from the department, the facility may continue to operate, subject to all requirements applicable to the facility under this chapter, pending final action on its permit application even if the department does not complete the permit review process within the timeframe specified in this paragraph.
(5)The owner or operator shall comply with the provisions of each plan required under paragraph (2) as approved by the department and incorporated into the permit for the facility. The department shall impose any additional facility-specific conditions that are necessary to ensure compliance with this chapter and for the protection of human health and the environment. The department shall provide the owner or operator of the metal shredding facility with written findings explaining the basis for any such conditions.
(6)In reviewing any plan submitted pursuant to subparagraph (L) of paragraph (2), the department may request additional information from the owner or operator as necessary to determine the legitimacy of the offsite metal processing operations described in the plan, and may require modifications to the plan, or disapprove the plan, if the department determines that the receiving facility is not engaged in legitimate metal recycling.
(7)In considering an application for a metal shredding facility permit submitted pursuant to this subdivision, and the specific terms and conditions to be included in the permit, the department shall consider the site-specific aspects of the metal shredding facility, including, but not limited to:
(A)The nature of the surrounding community and environment.
(B)The results of any community-specific assessment.
(C)The facility size, location, and configuration.
(D)The equipment, enclosures, and infrastructure.
(E)The specific metal processing operations conducted at the metal shredding facility, including types of feedstocks and annual throughput.
(F)Other relevant site-specific characteristics.
(8)The department shall also conduct at least one site visit to the applicants facility after receipt of the permit application.
(c)(1)The owner or operator of a new metal shredding facility shall submit an application to the department for a permit and shall not commence operations at the new metal shredding facility until the department issues a permit.
(2)The application shall consist of both of the following:
(A)All the information described in paragraph (2) of subdivision (b).
(B)Any other information requested by the department relating to construction or operation of the new metal shredding facility.
(d)(1)The approval of an application for an existing or new metal shredding facility shall be considered a discretionary decision subject to the California Environmental Quality Act ((CEQA) Division 13 (commencing with Section 21000) of the Public Resources Code). Nothing in this chapter is intended to modify, restrict, or expand the provisions of CEQA as applied to metal shredding facilities.
(2)The department may require an applicant for a metal shredding facility permit to submit additional information in support of an application.
(e)A permit issued pursuant to this section shall authorize the storage and processing of metal shredder aggregate, and the onsite chemical treatment of metal shredder residue conducted at the metal shredding facility, if chemical treatment of residue is included in the permit application. A metal shredding facility that begins chemical treatment of metal shredder residue for the first time after the effective date shall notify the department no later than 30 days before commencement of treatment operations at the facility and shall provide the department with all information required by this chapter relating to the chemical treatment operations within 120 days of commencement of operations. This section does not require a permit for the operation of a hammer mill or other equipment used at a metal shredding facility that does not involve the handling of metal shredder aggregate or chemical treatment of metal shredder residue.
(f)(1)Any permit for a metal shredding facility approved under this chapter shall be for a fixed term of 10 years, unless the department determines that a shorter term is necessary to protect human health, safety, or the environment or based on the compliance history of the facility.
(2)At least two years before the expiration of a permit, the owner or operator of a metal shredding facility intending to renew the facilitys permit shall submit a complete application for permit renewal, pursuant to this section, that has been updated to reflect the current operations of the facility.
(3)The department shall review the information and either determine the submission is complete or request additional information from the owner or operator. If the application to renew the permit is submitted before the end of the fixed term, the permit shall be deemed extended until the department has taken final action to renew or deny the renewal application and the owner or operator has exhausted all applicable rights of appeal.
(4)When prioritizing pending renewal applications for review and in determining the need for any new conditions on a renewed permit, the department shall consider any input received from the public.
(g)The department shall consider the compliance history of the metal shredding facility, including the requirements of any permit issued by any other agency in reviewing the facilitys application for permit renewal and in considering the need for additional conditions to be included in the permit.
(h)(1)The requirements of this subdivision apply to all permit applicants.
(2)Before the submission of a permit application or application for permit renewal for a metal shredding facility, the applicant shall hold at least one public meeting, or other community engagement activity approved by the department, to inform the community of metal processing activities and any potential impacts to nearby communities and solicit questions and input from the public. The applicant shall prepare a sign-in sheet for the meeting and allow all attendees an opportunity to provide their names and addresses. The public meeting or community engagement activity shall be noticed to the community at least 30 days in advance, using a form of communication preferred by the community, and be held in an accessible location at a convenient time. The applicant shall invite the department and other regulatory agencies with jurisdiction over the metal shredding facility.
(3)The applicant shall submit a summary of the meeting or activity described in paragraph (2), and a list of attendees and their addresses voluntarily provided pursuant to paragraph (2), if any, and copies of any written comments or materials submitted, if any, to the department as a part of the permit application or application for permit renewal. The summary of the preapplication meeting or activity shall include, but not be limited to, all of the following:
(A)A summary of the metal shredding facilitys communications to the public about proposed or then current metal processing activities and their potential impacts on nearby communities.
(B)A summary of public input and questions.
(C)Responses to public input and questions and how public input has informed the application materials, if applicable.
(4)After the submission of a complete permit application or application for permit renewal for a facility, and before the public meeting described in paragraph (5), the department shall schedule periodic progress meetings to inform the community of the status of the permitting process, including the owners or operators implementation of any interim measures or controls required by the department pursuant to Section 25095.11. Meetings shall be held pursuant to this paragraph at least once per year and shall be noticed and convened as specified in paragraph (2).
(5)Before a decision is made to approve or deny the application, the department shall solicit comment from the community on the completed application materials and hold a public meeting. The public comment period shall be open for a minimum of 45 days. The department shall respond to all public comments within 60 days of the close of the public comment period. The public comments and the departments responses to the comments shall be included in the administrative record for the permit proceeding and in the departments notice of its intended decision to approve or deny the permit.
(6)Before initiating a public outreach process, the department and the owner or operator of a metal shredding facility shall solicit and incorporate feedback from the surrounding community to determine a locally appropriate process for community engagement.
(i)The department shall post on its internet website general information about each metal shredding facility that has applied for or obtained a permit under this chapter, including without limitation the facilitys current permit status, a schedule for issuance of a draft permit and associated public meetings and opportunity for public comment periods, and a summary of the facilitys compliance history subsequent to the effective date.
(j)The department shall include in the fire response plan for a metal shredding facility any reasonable and necessary additional requirements or conditions that are recommended by the local fire department.
(k)The department, when considering the application for a metal shredding permit for a small metal shredding facility, shall take into consideration the size and nature of the facility when processing the permit application and assessing fees.
25095.11.Notwithstanding Section 25095.10, an owner or operator of a metal shredding facility that has submitted a permit application and is unable to comply with all the requirements of this chapter as of the effective date may continue to operate pending the departments final permit decision, subject to all of the following requirements specified in this section. Failure to meet the requirements of this section shall be subject to enforcement under Article 8 (commencing with Section 25095.60).
(a)(1)The owner or operator identifies in its application each provision of this chapter that the facility is unable to immediately comply with, including, without limitation, provisions applicable to management of metal shredder aggregate, light fibrous material, and metal shredder residue, and has developed and implemented a plan and schedule approved by the department for achieving compliance with the provisions of this chapter.
(2)Plans shall be submitted along with the permit application required in subdivision (b) of Section 25095.10.
(b)On or before the effective date, the owner or operator complies with the requirements set forth in subdivision (b) of Section 25095.13. A copy of the fire response plan shall be submitted to the department within seven days of the effective date and shall be subject to review and approval of the department after consultation with the facility and the local fire department of the jurisdiction where the facility is located.
(c)On or before the effective date, the owner or operator complies with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13.
(d)The owner or operator initiates, diligently pursues, and implements financial assurance for closure and third-party liability as required pursuant to Section 25095.41, including, but not limited to, both of the following:
(1)The owner or operator submits to the department a cost estimate and closure plan as part of the permit application.
(2)Within 30 days after the permit application is submitted, the owner or operator submits to the department a financial assurance mechanism that is equivalent to the requirements set forth in Sections 66264.143 and 66264.147 of Title 22 of the California Code of Regulations, except that a small metal shredding facility may submit the financial assurance mechanism within 90 days after the permit application is submitted.
(e)The owner or operator initiates and diligently pursues to completion a preliminary endangerment assessment, as required pursuant to Section 25095.30, or otherwise meets the requirements in Section 25095.30 and initiates any required actions identified in the preliminary endangerment assessment.
(f)The owner or operator complies with the standards set forth in Chapter 12 (commencing with Section 66262.10) of Division 4.5 of Title 22 of the California Code of Regulations with respect to all hazardous wastes generated at the facility.
(g)The owner or operator, at a minimum, maintains all existing practices and controls that are in effect or otherwise required by the department, a unified program agency, or a local environmental health department on or before the effective date, that are designed to prevent the possibility of any unplanned sudden or nonsudden release of any of the following into air, soil, or water that could threaten human health or the environment:
(1)In-process materials or components thereof, including metal shredder aggregate and light fibrous material.
(2)Hazardous waste or hazardous waste constituents.
(3)Metal shredder residue.
(4)Chemically treated metal shredder residue.
(h)The owner or operator complies with the following standards:
(1)Containment areas shall be in good condition; if there is a leak, contents shall be immediately transferred.
(2)Accumulation areas shall be inspected at least weekly.
(3)Containment areas shall be visibly labeled with contents and start date of accumulation. If labeling is infeasible, a record of the start dates of accumulation shall be maintained and made available to the public upon request.
(4)Incompatible materials shall not be kept together.
(5)All emergency equipment shall be regularly tested or maintained according to manufacturer standards.
(6)Employees shall have unimpeded access to emergency materials.
(7)There shall be at least one person on premises or on call at all times.
(8)Personnel training shall be required for emergency procedures for all possible emergencies and prevention requirements and shall include job specific and general awareness training.
(i)The owner or operator shall be subject to any interim measures or controls established by the department during consideration of the permit application that are necessary for the protection of human health and the environment. The department shall provide the owner or operator of the metal shredding facility with written findings explaining the basis for those interim requirements and a reasonable schedule for compliance with those measures.
25095.12.The owner or operator of a metal shredding facility shall operate the metal shredding facility in accordance with all of the following requirements:
(a)(1)The metal shredding facility shall be maintained and operated to minimize the possibility of a fire, explosion, or any unplanned sudden or nonsudden release of in-process materials or components thereof, including metal shredder aggregate and light fibrous material, into air, soil, or water that could threaten human health or the environment by implementing all reasonable and feasible operational or engineering methods of control, including, but not limited to, technologies or equipment taking into consideration the size, configuration, and location of the facility, the characteristics of the materials handled, and other relevant factors.
(2)The owner or operator shall take precautions to prevent accidental ignition or reaction of material that exhibits the characteristics of ignitability or reactivity. While ignitable or reactive material is being handled, the owner or operator shall confine smoking and open flame to specially designated locations. No Smoking signs shall be conspicuously placed wherever there is a hazard from ignitable or reactive material.
(3)The transfer, treatment, storage, or disposal of ignitable or reactive material shall be conducted so that it does not do any of the following:
(A)Generate extreme heat or pressure, fire or explosion, or violent reaction.
(B)Produce uncontrolled toxic mists, fumes, dusts, or gases in sufficient quantities to threaten human health or the environment.
(C)Produce uncontrolled flammable fumes or gases in sufficient quantities to pose a risk of fire or explosions.
(D)Damage the structural integrity of the device or facility containing the material.
(E)Any other activity similar to those listed in subparagraphs (A) to (D), inclusive, that threatens human health or the environment.
(b)(1)The owner or operator of the metal shredding facility shall develop and follow an inbound source control policy designed to prevent the shredding of any of the following materials or wastes at the facility:
(A)RCRA hazardous waste, as defined in Section 66261.100 of Title 22 of the California Code of Regulations, and non-RCRA hazardous waste, as defined in Section 66261.101 of Title 22 of the California Code of Regulations.
(B)Asbestos and asbestos-containing materials, except incidental asbestos-containing material that may be contained inside equipment and is not visible upon inspection.
(C)Radioactive materials.
(D)Petroleum-based wastes, including, but not limited to, used oil as defined in Section 25250.1, gasoline, and diesel, but not including non-free-flowing residual quantities of such wastes contained in depolluted vehicles or appliances.
(E)Polychlorinated biphenyls (PCB) materials and wastes, including, but not limited to, capacitors, electrical transformers, and transformer components.
(F)Fluorescent light ballasts, fluorescent lamps, neon, and high-intensity or mercury vapor lights.
(G)Military ordnance, except ordnance designated specifically as Material Designated as Safe (MDAS).
(H)Explosives, explosive residues, fireworks, and other incendiary materials.
(I)Regulated electronic waste.
(J)Mercury containing devices.
(K)Batteries, including, but not limited to, lead-acid batteries and lithium-ion batteries.
(L)Compressed gas cylinders and propane canisters, unless empty and disabled.
(M)Materials requiring special handling, as defined in Section 42167 of the Public Resources Code.
(2)The inbound source control policy shall contain all of the following:
(A)A written description of the load checking protocol designed to prevent materials or wastes identified in paragraph (1) from being shredded at the facility. Incoming feedstock subject to load checking shall not be shredded until the load-checking process has been completed.
(B)A written description of the process for rejecting loads, specific materials, or wastes that contain the materials or wastes identified in paragraph (1).
(C)A plan and template documents used to demonstrate that load checks are conducted and that materials or wastes identified in paragraph (1) are not accepted.
(D)A requirement to maintain all documentation related to the inbound source control policy and load checking the facility for at least five years and provide the documentation to the department upon request.
(E)A written description of a process to make a waste determination pursuant to Section 66262.11 of Title 22 of the California Code of Regulations for any of the materials or wastes listed in paragraph (1) that are identified after completion of the load check process and that were unknowingly accepted by the facility. Any waste determined to be a hazardous waste shall be considered generated at the metal shredding facility and shall be managed as a hazardous waste in accordance with Chapter 6.5 (commencing with Section 25100) and its implementing regulations.
(c)The owner or operator of the metal shredding facility shall develop and implement procedures for any depollution operations that are conducted at the metal shredding facility involving the removal of automotive fuels, lubricating oils, refrigerants, and materials that require special handling, as defined in Section 42167 of the Public Resources Code, including procedures for the proper management of those materials or wastes that are removed during depollution operations, pursuant to Section 25212.
(d)(1)The owner or operator of the metal shredding facility shall maintain all of the following documents at the metal shredding facility:
(A)A written inspection schedule meeting the substantive requirements of subdivision (b) of Section 66265.15 of Title 22 of the California Code of Regulations.
(B)A written description of training documents, including a syllabus or outline, of the type and amount of both introductory and continuing training that has been given to each person at the metal shredding facility.
(C)A contingency plan that contains the information specified in Section 66265.52 of Title 22 of the California Code of Regulations.
(D)A copy of any local air quality management district or air pollution control district permit and other governmental permits or approvals required for operation of the metal shredding facility equipment.
(E)The closure plan required under Section 25095.40.
(F)A copy of documents related to any environmental investigation and any cleanup or other remediation measures implemented at the facility within the last five years.
(G)The housekeeping plan prepared pursuant to Section 25095.13.
(H)Records of offsite transportation of metal shredder aggregate and CTMSR.
(2)The owner or operator shall make the documents described in paragraph (1) available at the metal shredding facility to the department, the United States Environmental Protection Agency, or a local governmental agency upon request.
(e)The owner or operator of a metal shredding facility shall comply with all of the following:
(1)Subdivision (b) of Section 66265.142 of Title 22 of the California Code of Regulations.
(2)The contingency plan as required in subparagraph (C) of paragraph (1) of subdivision (d).
(3)As applicable, Article 3 (commencing with Section 66265.30) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(4)Article 16 (commencing with Section 66265.370) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(f)The owner or operator of a metal shredding facility shall provide notice to the department of an imminent or actual emergency situation, as required by Section 66265.56 of Title 22 of the California Code of Regulations.
(g)The owner or operator of a metal shredding facility shall provide written notice to the department at least 60 days before transferring ownership or operation of the facility.
(h)The owner or operator shall prevent the unknowing entry, and prevent unauthorized entry, of persons or livestock onto the active portion of the facility.
(i)For any new construction at a facility located in a 100-year floodplain or within the maximum high tide, the facility shall take all reasonable and feasible precautions to prevent washout of any hazardous materials.
(j)For any new construction at a facility, the facility shall take all reasonable and feasible precautions to withstand the maximum credible earthquake.
25095.13.The owner or operator of a metal shredding facility shall develop and comply with plans and minimum standards relating to each of the following aspects of the metal processing operation:
(a)The control of releases, including, but not limited to:
(1)Plans for complying with applicable local air quality management district or air pollution control district regulations and permit requirements, including the requirements of any approved emissions minimization plan or comparable plan required by applicable regulations.
(2)A housekeeping plan that is approved by the department and that does all of the following:
(A)Details all measures to control dispersal of metal shredder aggregate and its constituents, including light fibrous material, and metal shredder residue and constituents. Those measures shall include, but are not limited to, mechanical and manual sweeping, washing or cleaning of equipment and structures to remove accumulated debris, application of water using water trucks, sprinklers, spray bars, deluge systems or other dust suppression equipment, fencing, and enclosures.
(B)Specifies the frequency for each measure detailed pursuant to subparagraph (A).
(C)Addresses the disposition of residuals generated from cleaning, including, but not limited to, debris, sweepings, rinse water, and any other material that does not contain recoverable ferrous or nonferrous metal.
(D)Requires the completion of written logs of all housekeeping activities. The written logs shall be maintained in accordance with Section 25095.12.
(E)Requires the management of any light fibrous material that has been released from the facility to be subject to regulation under Chapter 6.5 (commencing with Section 25100).
(3)A metal shredding facility inspection plan that is approved by the department. The metal shredding facility inspection plan shall include all of the following:
(A)Inspection of all facilities and equipment that is used to manage metal shredder aggregate.
(B)A copy of a general inspection schedule that complies, with the specific requirements in Sections 66264.174, 66264.195, 66264.254, 66265.403, and 66264.1101 of Title 22 of the California Code of Regulations, and, as applicable, complies with the specific requirements in subdivision (i) of Section 66264.193, and Sections 66264.195, 66264.226, 66264.273, 66264.303, 66264.602, 66264.1033, 66264.1052, 66264.1053, 66264.1058, 66264.1084, 66264.1085, 66264.1086, 66265.1088, and 66264.1101 of Title 22 of the California Code of Regulations.
(C)All areas where the deposition of metal shredder aggregate, including light fibrous material and metal shredder residue may occur, including accessible areas within 500 feet of the metal shredding facilitys property boundary or further as determined by the department.
(4)An inventory management plan, that is approved by the department, to prevent accumulation of shredder feedstock and metal shredder aggregate and treated or untreated metal shredder residue in excess of the limitations set forth in subparagraph (E) of paragraph (2) of subdivision (b).
(5)Standards for the installation and maintenance of paving with concrete, steel plate, or other surfacing materials approved by the department that are designed to prevent infiltration and to collect and route water to a water management system. The paving shall be inspected quarterly and repaired as needed. The results of the paving inspections and any paving repairs shall be submitted to the department with the annual report and as requested by the department.
(b)(1)A separate written plan for the prevention, detection, and suppression of fires. The plan shall comply with all of the following:
(A)Be shared with local emergency responders.
(B)Be used to monitor metal shredding facility operations for evidence of incipient fire.
(C)Establish procedures for responding to fires of different duration and severity.
(D)Be activated in response to any incident at the metal shredding facility that falls within the scope of the plan.
(2)The plan shall include all of the following:
(A)Procedures for response to incipient fires and access to adequate water, water pressure, firefighting foam, and other supplies at the metal shredding facility that can be used in responding to an incipient or larger fire.
(B)Training of metal shredding facility personnel in the proper use of fire-response equipment and procedures and notification requirements.
(C)Coordination with local fire departments, the unified program agency, if other than the fire department, and other first responders as necessary to support maximum effectiveness in responding to an emergency at the metal shredding facility.
(D)Monitoring of temperatures on all feedstock and metal shredder aggregate piles, using an infrared camera or other equivalent equipment that continuously monitors the temperature of feedstock and aggregate piles and provides an alarm or other indication of temperature increases outside normal range.
(E)Inventory management provisions necessary to prevent the accumulation of feedstock or metal shredder aggregate at the facility in quantities that exceed the reasonable holding capacity of the facility and that cannot be processed within normal operating cycles, including typical periods of breakdown, maintenance, and repair. The following limits shall apply:
(i)No individual stockpile of feedstock shall exceed the amount of material that can be processed within a 24-hour period.
(ii)No individual pile of metal shredder aggregate shall exceed the amount of material that can be processed within a 48-hour period.
(iii)No individual pile of feedstock or metal shredder aggregate shall remain inactive for more than 48 hours except during periods when the facility is closed or not operating. Periods of breakdown, maintenance and repair, or under other circumstances specified in the facilitys approved inventory management plan, shall not be included in calculating the 48-hour period. A pile shall not be considered inactive if the majority of the material in the pile is removed over a period of 48 hours. In the event of an incident that is required to be reported to the department under Section 25095.31, the department may reduce the number of hours that a pile of feedstock or metal shredder aggregate may remain inactive until the owner or operator demonstrates to the satisfaction of the department and the local fire department that the risk of fire has been mitigated.
(iv)During any period of breakdown and associated repair that exceeds 72 hours, the feedstock and metal shredder aggregate piles shall be subject to additional controls as specified in the facilitys approved inventory management plan. Any shredder feedstock accepted by the facility during a period of breakdown, maintenance, or repair exceeding 72 hours shall be managed in accordance with the facilitys approved inventory management plan.
(v)All feedstock and metal shredder aggregate piles shall be subject to continuous 24-hour onsite surveillance, including when the facility is not operating, and such other additional controls specified in the facilitys approved fire response plan. All electronic surveillance data shall be maintained for a period of at least 14 days following any incident that is required to be reported to the department under Section 25095.31.
(F)Provisions for capture and management of fire suppression water as necessary to prevent discharge into storm drains or runoff into surface water.
(G)Requirement for at least one person to be present at the facility or on call at all times.
(3)The department, in coordination with the local fire department of the jurisdiction where the metal shredding facility is located, shall review a facilitys fire response plan on an annual basis and require the owner or operator to update the plan if necessary based on changes in technology or fire prevention practices, or the facilitys compliance history and history of fire, explosion, or release of hazardous waste or hazardous waste constituents.
(c)Stormwater management and control, including, but not limited to:
(1)Containment of stormwater in retention ponds, sumps, tanks, and associated piping or other engineered retention units to minimize free-standing water at the metal shredding facility.
(2)A stormwater testing plan to identify if stormwater exhibits any characteristics of toxicity as described in Section 66261.24 of Title 22 of the California Code of Regulations.
(3)Compliance with the metal shredding facilitys stormwater pollution prevention plan and spill prevention, control, and countermeasures plan.
(4)Discharge of stormwater in accordance with the general permit for discharges of stormwater associated with industrial activities or waste discharge requirements issued by a regional water quality control board, including sampling requirements.
25095.14.(a)Subject to subdivision (b), the owner or operator of a metal shredding facility may make the following physical or operational changes to the metal shredding facility without seeking prior approval from the department:
(1)Throughput increases and increases in maximum operating rate that are authorized or approved by an air quality management district or air pollution control district.
(2)Increases in efficiency of metal processing operations, including, without limitation, sizing, separation, sorting, removal, and recovery.
(3)Changes in design of processing equipment and conveyance systems.
(4)Changes in operations and methods of operation.
(5)Installation and modification of processing and other equipment and conveyance systems.
(6)Repair and replacement of processing and other equipment and conveyance systems.
(7)Decommissioning and removal of equipment and conveyance systems that are no longer in use.
(8)Construction of new structures and enclosures and changes to structures and enclosures.
(9)Installation and modification of abatement equipment and emission control systems.
(10)Installation of and modifications to water reuse and recycling systems.
(11)Installation of and repair to paving.
(12)Any other changes to the metal shredding facility unrelated to the storage or processing of metal shredder aggregate and metal shredder residue.
(b)Except as provided in subdivision (d), the changes described in subdivision (a) may be made without seeking prior approval from the department if the metal shredding facility maintains substantial compliance with this chapter and the owner or operator provides the department with written notice of these changes within 30 days of making the changes. The department shall post the notice on the section of its internet website that provides information regarding metal shredding facilities.
(c)The department shall evaluate the information provided in the notice from the facility pursuant to this subdivision, as well as any objections from the public, to assess whether the modification could result in a potentially significant impact on the environment. If the department determines that the modification could have a potentially significant impact on the environment, the owner or operator of the facility shall be required to implement changes to the modification as necessary to mitigate the impact to the extent feasible.
(d)The owner or operator of a metal shredding facility that proposes to modify the metal shredding facility in a manner that could result in a significant environmental impact from operations that were not considered by the department in reviewing the information submitted pursuant to this article shall provide the department with 60 days advance written notice of the modification and shall not implement the modification without approval from the department. The department shall provide notice of the proposed modification to the public and shall comply with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) in its review of the project.
(e)(1)On or before July 1 of each year, the owner or operator of a metal shredding facility shall submit an annual report to the department describing the material physical or operational changes, if any, made to the metal shredding facility during the previous calendar year relating to the management of metal shredder aggregate or metal shredder residue.
(2)Upon request by the department, the metal shredding facility shall be required to provide additional information about the nature or extent of changes described in the notice provided pursuant to subdivision (b) or the annual report as necessary to demonstrate the metal shredding facilitys ongoing compliance with applicable regulations.
(3)Physical changes to the metal shredding facilitys ongoing operations that are reported to the department in compliance with paragraph (1) may be reviewed and modified by the department as necessary to ensure compliance with the requirements of this chapter.
25095.15.(a)The owner or operator of a metal shredding facility shall manage all metal shredder aggregate during metal processing operations as necessary to achieve the following minimum standards:
(1)All outdoor equipment used for processing metal shredder aggregate shall be enclosed or covered and designed, operated, and maintained to minimize the possibility of the release of light fibrous material into the environment.
(2)All outdoor equipment used for the conveyance of metal shredder aggregate from one location within the metal shredding facility to another location within the metal shredding facility shall be enclosed or covered and designed, operated, and maintained to minimize the possibility of the release of light fibrous material into the environment.
(3)All vehicles used for the outdoor transfer of metal shredder aggregate shall be loaded and unloaded in a manner that minimizes the possibility of the release of metal shredder aggregate, including light fibrous material into the environment.
(b)Metal shredder aggregate shall be stored or accumulated inside a structure that protects the material from exposure to the elements and minimizes the possibility of the release of light fibrous material into the environment. At a minimum, the structure shall meet all of the following requirements:
(1)The structure shall be enclosed with a floor, roof, and walls sufficient to protect the metal shredder aggregate from exposure to the elements and to contain the metal shredder aggregate and any process residues that are managed in the structure.
(2)The roof shall completely cover all areas used for storage or accumulation of metal shredder aggregate.
(3)The floor shall be constructed of concrete surfacing, steel plate, or other surfacing material approved by the department designed to prevent infiltration and collect and route any water that drains from the metal shredder aggregate to a process water management system. The floor shall be inspected on a quarterly basis and repaired as needed. The results of the inspections and any repairs to the floor shall be included in the annual report submitted to the department pursuant to Section 25095.14.
(4)Any liquids that drain from materials stored inside the enclosure shall be collected and routed to the metal shredding facilitys recycled water management system.
(c)Trommel or augers shall be located in a building or otherwise covered or enclosed so as to minimize the possibility of releases.
(d)Subject to written approval by the department, stockpiling of metal shredder aggregate outside the confines of an enclosure required by subdivision (b) may be allowed for limited periods of time if all of the following conditions are met:
(1)The activity is necessary to accommodate unforeseen circumstances or operational disruptions that prevent the material from being stored inside an enclosure. These unforeseen circumstances or operational disruptions shall have been outside the reasonable control of the facility. The facility shall use best efforts to remedy any unforeseen circumstances or operational disruptions that necessitate outdoor stockpiling of metal shredder aggregate.
(2)The operator provides written notice to the department, the unified program agency, and the local fire department at least 24 hours before the need to store material outside arises.
(3)The operator conducts watering or other dust control measures to minimize the possibility of the release of light fibrous material from the stockpile into the environment.
(4)The outdoor stockpiling activity is conducted for 10 or fewer consecutive operating days.
(5)The outdoor stockpiling activity does not begin until approval is provided by the department. The department may rescind the temporary approval for outdoor stockpiling if the facility is not using best efforts to remedy any unforeseen circumstances or operational disruptions that necessitate outdoor stockpiling.
(e)The requirements of this section shall also apply to the management of untreated and treated metal shredder residue.
25095.16.(a)Metal shredder aggregate that is transported to an offsite metal shredding facility or metal recycling facility for purposes of processing shall be tarped or otherwise contained during shipment and transported in a manner that minimizes the possibility of release into the environment.
(b)The metal shredder aggregate shall be shipped directly to the offsite metal processing facility and shall not be handled at any interim location or held at any publicly accessible interim location for more than four hours unless required by hours of service or other applicable law or held by a rail transporter for reasons outside the control of the person arranging for transport.
(c)Each shipment of metal shredder aggregate by truck or rail shall be identified by a standard bill of lading or other shipping document that complies with applicable United States Department of Transportation requirements and that contains all of the following:
(1)The quantity, by weight, of metal shredder aggregate being transported.
(2)The name, physical and mailing addresses, and telephone number of the metal shredding facility that produced the metal shredder aggregate.
(3)The name, physical and mailing addresses, and telephone number of the metal processing facility that will process the metal shredder aggregate.
(4)The date the shipment of metal shredder aggregate leaves the originating metal shredding facility.
(5)The date the shipment of metal shredder aggregate is scheduled to arrive at the receiving metal processing facility.
(6)The name of the transporter that shipped the metal shredder aggregate from the originating metal shredding facility to the receiving metal processing facility.
(d)The originating metal shredding facility shall retain a copy of all shipping documents onsite, in either paper or electronic form, for a period of at least three years. The three-year record retention period may be extended at the direction of the department during the course of any unresolved enforcement action regarding the shipments.
(e)Transporters shall obtain and maintain liability insurance in accordance with Section 34631.5 of the Vehicle Code. A transporter shall cease to transport metal shredder aggregate upon loss of liability coverage.
(f)The owner or operator of the originating facility shall include in the annual report submitted to the department under Section 25095.14 the total tonnage of metal shredder aggregate that was shipped to another recycling facility for processing during the calendar year, the name of each transporter used for this purpose, the bill of lading numbers, and the total tonnage transported by that transporter during the calendar year, and the name and location of the facilities that processed the material. The department shall handle the information in a manner consistent with exceptions or exemptions under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
4.Classification of Materials25095.20.(a)Except as provided under the applicable provisions of the federal Resource Conservation and Recovery Act of 1976, as amended (42 U.S.C. Sec. 6901 et seq.), if managed in accordance with this chapter, including any plans approved by the department and any additional conditions imposed by the department pursuant to Section 25095.10 or 25095.11, the following materials are not waste, as defined in Section 25124, and shall not be subject to regulation under Chapter 6.5 (commencing with Section 25100) of this division or Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations:
(1)Scrap metal.
(2)Metal shredder aggregate that is managed in either of the following ways:
(A)The metal shredder aggregate is stored and processed at the same metal shredding facility that produced the metal shredder aggregate.
(B)The metal shredder aggregate is transferred to another metal shredding facility or metal recycling facility within federal Standard Industrial Classification Code 5093 for the purpose of processing or further processing the metal shredder aggregate to separate and remove ferrous or nonferrous metals, subject to all of the following:
(i)Either one of the following:
(I)The receiving facility is located in the State of California and operates in accordance with the requirements of this chapter.
(II)The receiving facility is located in a state other than the State of California and is operated in accordance with the law of the state where the receiving facility is located.
(ii)Before transportation offsite, the metal shredder aggregate is managed in accordance with the requirements of the plan approved by the department under subparagraph (L) of paragraph (2) of subdivision (b) of Section 25095.10.
(iii)The receiving facility keeps records of the amount of ferrous and nonferrous scrap metal recovered from the metal shredder aggregate and makes this information available to the department upon request.
(iv)The metal shredder aggregate is transported in accordance with the requirements of Section 25095.16.
(3)Intermediate metal products that are subject to further processing to improve product quality.
(4)Finished ferrous and nonferrous scrap metals that are separated or removed from metal shredder aggregate at a metal shredding facility.
(5)Nonmetallic recyclable items recovered from metal shredder aggregate for which a market exists.
(b)Notwithstanding subdivision (a) and any other provision of this chapter, metal shredder aggregate, including light fibrous material, that is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, shall be subject to regulation as hazardous waste under Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations, if it exhibits a characteristic of hazardous waste specified in those regulations.
25095.21.(a)Untreated metal shredder residue that meets the definition of a non-RCRA hazardous waste as defined in Section 66261.101 of Title 22 of the California Code of Regulations shall be chemically treated in accordance with this section or managed in accordance with all applicable requirements of Chapter 6.5 (commencing with Section 25100) and implementing regulations. Chemically treated metal shredder residue is not hazardous waste if all of the following conditions are met:
(1)Unless an alternative treatment recipe is approved by the department, untreated metal shredder residue shall be treated with at least 0.7 gallons of silicate solution per short ton of the untreated metal shredder residue and cement by weight equal to 8.5 percent of the weight of the untreated metal shredder residue.
(2)Metal shredding facilities shall document, on a weekly basis, how many tons of metal shredder residue was treated and how much silicate solution and cement were used in the treatment of the untreated metal shredder residue to comply with paragraph (1).
(3)The chemically treated metal shredder residue does not meet the definition of RCRA hazardous waste, as defined in Section 66261.100 of Title 22 of the California Code of Regulations.
(4)Immediately after waste stabilization, and at all times before offsite transportation and disposal, chemically treated metal shredder residue shall be managed in a manner that prevents releases of chemically treated metal shredder residue outside of a designated accumulation area. The designated accumulation area shall meet the requirements of either of the following:
(A)A self-supporting structure that meets all of the following requirements:
(i)The structure shall be fully or partially enclosed with a floor, at least three walls, and a roof to prevent exposure of the chemically treated metal shredder residue to the elements, including surface transport by precipitation runoff, contamination of soil and groundwater, and wind dispersal outside the enclosure.
(ii)The structure shall be constructed of man-made materials of sufficient strength and thickness to support themselves, the waste contents, any personnel and heavy equipment that operate within the unit, and the stresses of daily operation, such as the movement of personnel, wastes, and handling of equipment within the structure.
(iii)The designated accumulation area shall be labeled or marked clearly with the words Chemically Treated Metal Shredder Residue or CTMSR. The metal shredding facility shall comply with accumulation time limits as required in Section 66262.17 of Title 22 of the California Code of Regulations.
(B)A containment building that meets the requirements of either of the following:
(i)Article 29 (commencing with Section 66264.1100) of Chapter 14 of Title 22 of the California Code of Regulations.
(ii)Article 29 (commencing with Section 66265.1100) of Chapter 15 of Title 22 of the California Code of Regulations.
(b)Chemically treated metal shredder residue shall not be transported to, and shall not be disposed of at, any location other than one of the following:
(1)A composite-lined portion of a solid waste landfill unit that meets all requirements applicable to disposal of municipal solid waste in California after October 9, 1993, based on State Water Resources Control Board Resolution No. 93-62.
(2)A solid waste landfill or other facility that is regulated by waste discharge requirements issued pursuant to Division 7 (commencing with Section 13000) of the Water Code for discharges of designated waste, as defined in Section 13173 of the Water Code, or that allows for the discharge of chemically treated metal shredder residue. The discharge of chemically treated metal shredder residue includes its use as an alternative daily cover or for other beneficial reuse pursuant to Section 41781.3 of the Public Resources Code and the regulations adopted to implement that section.
(3)Any other landfill or location that is authorized by law to receive chemically treated metal shredder residue for disposal or beneficial use.
(c)The transporter of chemically treated metal shredder residue shall comply with all of the following conditions:
(1)Chemically treated metal shredder residue shall be contained and covered during shipment and transported in a manner that prevents any release into the environment.
(2)The transporter shall comply with all applicable United States Department of Transportation shipping requirements.
(3)The vehicle of railcar used to transport chemically treated metal shredder residue shall lack evidence of leakage, spillage, or damage that could cause releases under reasonably foreseeable conditions.
(4)The transporter of chemically treated metal shredder residue shall not transport chemically treated metal shredder residue to a place other than a landfill approved to receive chemically treated metal shredder residue, as described in subdivision (b).
(5)The chemically treated metal shredder residue is not held at any publicly accessible interim location for more than four hours, unless required by other provisions of law, before disposal.
(6)If an unauthorized release of chemically treated metal shredder residue occurs during transportation, the transporter shall immediately contain all releases of chemically treated metal shredder residue and residues from chemically treated metal shredder residue into the environment and determine whether any material resulting from that release is a hazardous waste and, if so, shall manage the hazardous waste in compliance with all applicable requirements of this division. The transporter of chemically treated metal shredder residue is considered the generator of any hazardous waste resulting from the release and is subject to the requirements of Chapter 12 (commencing with Section 66262.10) of Division 4.5 of Title 22 of the California Code of Regulations.
(d)Each shipment of chemically treated metal shredder residue shall be accompanied by a shipping document containing all of the following information:
(1)The quantity, by weight in short tons, of chemically treated metal shredder residue being transported.
(2)The name, physical and mailing addresses, and telephone number of the generating metal shredding facility.
(3)The name, physical and mailing addresses, and telephone number of the destination landfill.
(4)The date the shipment of chemically treated metal shredder residue leaves the metal shredding facility.
(5)The date the shipment of chemically treated metal shredder residue arrives at the destination landfill.
(6)The name and telephone number of the transporter who shipped the chemically treated metal shredder residue from the metal shredding facility to the destination landfill.
(e)The metal shredding facility shall retain onsite a copy of all documentation produced pursuant to this section for at least three years from the date that the chemically treated metal shredder residue that is the subject of the documentation was generated. The department may request the information identified in subdivision (d) in the form of a summary log or a copy of each individual shipping document. The three-year record retention period is automatically extended during the course of any unresolved enforcement action regarding chemically treated metal shredder residue management activity or as requested by the department.
(f)The generating metal shredding facility shall, on or before February 1 of the following year, submit to the department, at the address specified in subdivision (g) of this section, a written annual report containing all of the following information:
(1)The name, physical and mailing addresses, and telephone number of the generating metal shredding facility.
(2)The name, telephone number, and email address of the contact person at the generating metal shredding facility who should be contacted regarding management, transportation, and disposal of chemically treated metal shredder residue.
(3)The name, physical and mailing address, and telephone number for each of the landfills to which the generating metal shredding facility shipped chemically treated metal shredder residue during the previous calendar year.
(4)The total cumulative quantity of chemically treated metal shredder residue, by weight in short tons, shipped to all landfills, and the respective quantity of chemically treated metal shredder residue, by weight in short tons, shipped to each landfill, during the previous calendar year.
(5)The United States Environmental Protection Agency identification number of the generating metal shredding facility.
(g)The metal shredding facility shall provide a copy of any relevant document identified in subdivision (e) upon receipt of a request from the department. Annual reports submitted to the department pursuant to subdivision (f) shall be sent to the following address: Department of Toxic Substances Control, CTMSR Reporting Staff, P.O. Box 806, Sacramento, CA 95812-0806, with the words Attention: CTMSR Annual Report prominently displayed on the front of the envelope.
(h)The owner or operator of a metal shredding facility shall not be required to treat metal shredder residue and shall be exempt from this section if the owner or operator determines, as prescribed in Section 66262.11 of Title 22 of the California Code of Regulations, that the metal shredder residue generated at the facility does not exhibit any state or federal characteristics of hazardous waste, as prescribed in Chapter 11 (commencing with Section 66261.1) of Division 4.5 of Title 22 of the California Code of Regulations.
5.Reporting25095.30.(a)Except as otherwise provided in subdivision (c), within one year after the effective date, the owner or operator of a metal shredding facility shall conduct a preliminary endangerment assessment, as defined in Section 78095, and submit it to the department. The preliminary endangerment assessment shall be conducted in accordance with the most current department guidance manual for evaluating hazardous substance release sites and shall include an evaluation of process areas or locations where releases of materials containing hazardous constituents may have or have occurred, a conceptual site model, and site-specific human health and ecological screening evaluations.
(b)The owner or operator of a metal shredding facility shall conduct appropriate corrective action as needed to address releases of hazardous materials or wastes that pose a significant threat to human health or the environment. This subdivision does not prohibit the department from issuing a corrective action order under Section 25187 subsequent to any investigation of the metal shredding facility.
(c)The owner or operator of a metal shredding facility may demonstrate compliance with this section by providing evidence to the department that, within the last five years, the metal shredding facility has completed an assessment of the metal shredding facility pursuant to an order issued by the department, a regional water quality control board, or any other federal, state, or local agency and is implementing, or has implemented, any corrective action requirements imposed by the agency.
25095.31.(a)The owner or operator of a metal shredding facility shall provide the department with immediate notice of a fire or other incident at the metal shredding facility that requires the assistance of a local fire department or other first responder. This notice shall be in addition to any notice that is required to be made to the Office of Emergency Services pursuant to Section 66265.56 of Title 22 of the California Code of Regulations, the unified program agency, and any other agency under applicable law.
(b)The owner or operator of a metal shredding facility shall establish an effective means of providing public notice to members of the surrounding community upon the occurrence of a fire or other incident that poses a threat to human health or the environment outside of the facility as specified in Section 66265.56 of Title 22 of the California Code of Regulations.
(c)The department shall evaluate how to apply to metal shredding facilities its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations as described in subdivisions (b) and (c) of Section 25200.21.
25095.32.On or before July 1, 2030, the Board of Environmental Safety, at a specially scheduled public meeting, shall hear from the department and receive input from members of the public, metal shredding facilities, and other interested stakeholders on the implementation of this chapter. A notice announcing the proposed date, time, and location of the meeting shall be posted on the boards internet website at least 30 days before the meeting and may be changed by the board if an alternate meeting date or location is determined to be appropriate, which information shall be posted on the boards internet website at least 14 calendar days before the meeting. The board shall also allow remote participation in the meeting. Following the public meeting, the board shall provide the department with any recommendations regarding the implementation and administration of this chapter.
6.Closure25095.40.(a)The owner or operator of a metal shredding facility shall have a written closure plan.
(1)The written closure plan shall address all of the following:
(A)The closure and removal of all feedstock, metal shredder aggregate, and treated and untreated metal shredder residue.
(B)The decontamination of equipment and operating areas used for processing metal shredder aggregate.
(C)The treatment of metal shredder residue and management of chemically treated metal shredder residue.
(2)The written closure plan shall include all of the following:
(A)A description of how the equipment and areas used for processing metal shredder aggregate and for treating metal shredder residue will be closed. The description shall identify the maximum extent of the operation during the life of the equipment or area and how all of the following requirements will be met, if applicable:
(i)Section 66265.114 of Title 22 of the California Code of Regulations.
(ii)Subdivisions (a), (b), and paragraphs (1) and (2) of subdivision (c) of Section 66265.197 of Title 22 of the California Code of Regulations.
(iii)Section 66265.404 of Title 22 of the California Code of Regulations.
(B)An estimate of the maximum inventory of metal shredder aggregate and metal shredder residue in storage and in treatment at any time during the operation of the metal shredding facility.
(C)A description of the steps needed to remove or decontaminate an area, equipment, or structure during partial and final closure, including, but not limited to, procedures for cleaning equipment and removing contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required.
(D)An estimate of the expected year of closure and a schedule for final closure. The schedule for final closure shall include, at minimum, the total time required to close each authorized unit.
(3)The written closure plan shall be subject to approval by the department.
(4)An amendment to the written closure plan shall be done in compliance with subdivision (c) of Section 66265.112 of Title 22 of the California Code of Regulations.
(b)The metal shredder facility shall maintain compliance with both of the following requirements regarding closure:
(1)Subdivisions (a) and (b) of Section 66265.111 of Title 22 of the California Code of Regulations, in the same manner as those provisions apply to metal shredding facilities.
(2)Section 66265.114 of Title 22 of the California Code of Regulations.
(c)Within 90 days after processing the final volume of metal shredder aggregate, the owner or operator shall commence closure of the metal shredding facility in accordance with the written closure plan.
(d)The owner or operator shall complete closure activities in accordance with the written closure plan within 180 days after processing the final volume of metal shredder aggregate unless the owner or operator demonstrates to the department any of the following:
(1)The activities required to complete the closure will require longer than 180 days to complete.
(2)The facility has the capacity to process additional metal shredder aggregate.
(3)There is a reasonable likelihood that a person other than the owner or operator will recommence operation of a unit, the equipment or area, closure of the equipment and area would be incompatible with the operation of the metal shredding facility, and the owner or operator has taken and will continue to take all steps necessary to prevent threats to human health and the environment.
(e)The owner or operator shall notify the department and any other agencies having jurisdiction over the closure project at least 15 days before completion of closure.
(f)The owner or operator shall remain in compliance with all applicable requirements of this chapter until the owner or operator submits to the department or authorized agency a certification signed by the owner or operator and by an independent, professional engineer registered in California that closure has been completed in accordance with the written closure plan and that the written closure plan meets or exceeds the applicable requirements of this chapter.
25095.41.(a)The owner or operator shall provide a closure cost estimate to the department consistent with Section 66265.142 of Title 22 of the California Code of Regulations and based on all of the following factors:
(1)The cost of transporting any unprocessed metal shredder aggregate and metal shredder residue to another metal shredding facility for processing or disposal.
(2)The cost of decontaminating all areas and equipment used for storage and processing of metal shredder aggregate.
(3)The cost of decontaminating all areas and equipment used for treatment and storage of treated or untreated metal shredder residue.
(4)The cost for all closure sampling and analysis confirming decontamination sufficiently meets closure performance standards.
(5)The cost of disposition of the maximum amount of metal shredder aggregate and metal shredder residue that may be present at the metal shredding facility at the time of closure.
(6)The cost of closure certification.
(b)For the purpose of calculating the closure cost estimate, the owner or operator may apply the fair market value of any remaining feedstock and metal shredder aggregate against the estimated cost of closure. In addition, the owner or operator may take into consideration metal shredding facility structures, equipment, and other assets that may continue to be used, sold to third parties, or salvaged for scrap value. The closure cost estimate shall also be determined based on the site-specific aspects of the metal shredding facility, including, without limitation, those site-specific aspects specified in Section 25095.40.
(c)The owner or operator shall provide a financial assurance mechanism for closure of the metal shredding facility using one or more of the financial mechanisms described in Section 66265.143 of Title 22 of the California Code of Regulations.
(d)The owner or operator shall provide a financial assurance mechanism for bodily injury and property damage to third parties caused by sudden accidental occurrences arising from operations of the metal shredding facility. The owner or operator shall have and maintain liability coverage for sudden accidental occurrences in the amount of at least one million dollars ($1,000,000) per occurrence with an annual aggregate of at least two million dollars ($2,000,000), exclusive of legal defense costs. The owner or operator may satisfy the requirements of this subdivision through a financial mechanism identified in Section 66265.147 of Title 22 of the California Code of Regulations.
(e)If the facility is required to implement postclosure care following closure of the facility, the owner or operator shall provide a financial assurance mechanism for postclosure using one or more of the financial mechanisms described in Section 66265.145 of Title 22 of the California Code of Regulations.
7.Fees25095.50.(a)The following definitions shall apply for purposes of this article:
(1)Fee rate means the rate to be set by the department for the 202728 fiscal year, as annually adjusted by the Board of Environmental Safety beginning in the 202829 fiscal year and thereafter pursuant to subdivision (b).
(2)Fee schedule means the fee structure established in regulations by the department pursuant to subdivision (b) using the criteria in subdivision (c).
(b)(1)Beginning in the 202829 fiscal year, the rates established by the department shall be reviewed and shall be increased or decreased annually by the Board of Environmental Safety as necessary and shall provide for the assessment of no more than the reasonable and necessary costs of the department, the Board of Environmental Safety, and the Office of Environmental Health Hazard Assessment to implement this chapter as described in this section.
(2)The department shall collect an annual fee on all metal shredding facilities that are subject to the requirements of this chapter. The department shall establish and adopt regulations to administer this fee and to establish a fee schedule and rate that is sufficient to cover the departments reasonable costs to implement this chapter and Sections 25150.87 and 41514.6, excluding the costs described in Section 25095.51.
(3)The fee rate shall include, but not be limited to, the costs of fee administration, the costs of collection of the fee, the departments administrative costs, and statewide general administrative costs related to implementation of this chapter and Sections 25150.87 and 41514.6.
(4)The fee rate shall allow for a reserve in the fund each year at an amount sufficient to ensure that all programs funded by the subaccount will not be adversely affected by revenue shortfalls or baseline expenditure adjustments and does not exceed 10 percent of the authorized expenditure levels.
(5)The fees established pursuant to this section shall also be sufficient to cover the Office of Environmental Health Hazard Assessments reasonable costs to implement Sections 25150.87 and 41514.6.
(6)The fees established pursuant to this section shall also be sufficient to cover the reasonable costs incurred by the Board of Environmental Safety in the administration and implementation of its duties and responsibilities established by this chapter.
(c)In establishing a fee schedule that may be imposed on a metal shredding facility pursuant to this section, the department shall consider, but is not limited to considering, all of the following factors as they relate to the departments reasonable oversight costs:
(1)The facility-specific permit conditions, if any, developed pursuant to paragraph (5) of subdivision (b) of Section 25095.10.
(2)The size of the facility.
(3)The volume of feedstock that is shredded on an annual basis.
(4)The types of feedstock that are shredded at the facility.
(5)The nature of metal processing operations occurring at the facility, including the types of machinery used.
(6)Whether the facility conducts chemical stabilization of metal shredder residue.
(d)The Controller shall establish a new and separate Metal Shredding Facility Subaccount in the Hazardous Waste Control Account. The Metal Shredding Facility Subaccount shall be administered by the Director of Toxic Substances Control. The fees collected pursuant to this section shall be deposited into the Metal Shredding Facility Subaccount and be available for expenditure by the department, the Board of Environmental Safety, and the Office of Environmental Health Hazard Assessment, upon appropriation by the Legislature, solely for the purpose of implementation and administration of their respective duties pursuant to this chapter and Sections 25150.87 and 41514.6. The Director of Finance, upon request of the Director of Toxic Substances Control, may make a loan from the General Fund to the Metal Shredding Facility Subaccount to meet cash needs. The loan shall be subject to the repayment provisions of Section 16351 of the Government Code and the interest provisions of Section 16314 of the Government Code.
(e)(1)A regulation adopted pursuant to this section may be adopted as an emergency regulation in accordance with Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, and, for purposes of that chapter, including Section 11349.6 of the Government Code, the adoption of these regulations is an emergency and shall be considered by the Office of Administrative Law as necessary for the immediate preservation of the public peace, health, safety, and general welfare. Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, an emergency regulation adopted by the department or the Board of Environmental Safety pursuant to this section shall be filed with, but not be repealed by, the Office of Administrative Law and shall remain in effect for a period of two years or until revised by the department or the Board of Environmental Safety, whichever occurs sooner.
(2)Before adopting a regulation pursuant to this section, the department shall hold at least two public hearings regarding the proposed regulation, including one public hearing dedicated to assessing the impact of the proposed regulation on small metal shredding facilities as defined in this chapter.
(f)(1)A metal shredding facility paying an annual fee in accordance with this section is not subject to any of the following fees set forth in Chapter 6.5 (commencing with Section 25100), with respect to the production, transportation, and processing of metal shredder aggregate, the generation, handling, and management, transportation, and disposal of nonhazardous metal shredder residue:
(A)A fee imposed pursuant to Section 25205.7.
(B)A facility fee imposed pursuant to Section 25205.2.
(C)A fee imposed pursuant to Section 25205.5.
(2)A metal shredding facility is subject to the fees listed in paragraph (1) for any hazardous waste generated and handled by the metal shredding facility that are ancillary to metal processing operations at the metal shredding facility.
(g)The requirements and procedures in Article 2 (commencing with Section 43471) of Chapter 5 of Part 22 of Division 2 of the Revenue and Taxation Code, excluding Section 43478 of that article, shall apply to the fees paid pursuant to this section and to any claim for refund of fees alleged to have been erroneously or illegally assessed or collected, and any reference to the board or the California Department of Tax and Fee Administration in that article shall instead refer to the department. Any regulations adopted by the department to implement this section shall be consistent with those requirements and procedures.
25095.51.(a)(1)(A)A person who applies for a metal shredding facility permit under this chapter shall enter into a written agreement with the department pursuant to which that person shall reimburse the department for the direct costs reasonably incurred by the department in processing the permit application. The fee amount to be reimbursed by the applicant shall cover the departments costs for review of the permit application, the conduct of public meetings and notices associated with the permit process, and preparation of the permit.
(B)The fee described in subparagraph (A) shall be in addition to and separate from the annual fee assessed pursuant to Section 25095.50.
(2)An agreement required pursuant to paragraph (1) shall provide for a 25-percent deposit to be made with the submittal of the application. The 25-percent advance payment shall be based upon the departments total estimated costs of processing the application.
(b)(1)Pursuant to Section 21089 of the Public Resources Code, an applicant for a metal shredding facility permit shall also pay all costs incurred by the department for purposes of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), in conjunction with the application.
(2)Paragraph (1) does not apply to projects that are exempt from CEQA.
(c)Funds received pursuant to this section shall be placed in the Metal Shredding Facility Subaccount specified in subdivision (d) of Section 25095.50 and be available for expenditure by the department, upon appropriation by the Legislature, solely for the purposes of implementation and administration of this chapter and Sections 25150.87 and 41514.6.
8.Enforcement25095.60.(a)(1)The authority granted to the department in Article 8 (commencing with Section 25180) of Chapter 6.5 and implementing regulations set forth in Article 3 (commencing with Section 25095.10) of Chapter 22 of Division 4.5 of Title 22 of the California Code of Regulations may be used to enforce this chapter, including, but not limited to, the authority to conduct inspections and pursue administrative or judicial enforcement for violations of this chapter and any implementing regulations, to suspend the authorization of any metal shredding facility that has been determined based on substantial evidence to pose an imminent and substantial endangerment to human health or the environment, and to deny an application for a permit for any of the reasons set forth in paragraph (1) of subdivision (a) of Section 25095.61. These enforcement mechanisms shall apply to violations of this chapter relating to the management of materials listed in subdivision (a) of Sections 25095.20 and 25095.21. Except as provided in paragraph (2), the department shall exercise its enforcement authority under this article in response to any violation of this chapter or of the terms and conditions of a permit issued pursuant to this chapter, and all such enforcement actions shall be deemed to arise under this chapter.
(2)The department has the authority to pursue enforcement under Chapter 6.5 (commencing with Section 25100) for the following violations:
(A)For the operation of a metal shredding facility without having timely submitted a notice of intent and associated operating plans and other information required by paragraph (2) of subdivision (b) of Section 25095.10.
(B)For the operation of a metal shredding facility after a final decision by the department denying or revoking a permit pursuant to this chapter.
(C)For any offsite release of materials listed in Sections 25095.20 and 25095.21 if they meet the criteria of a hazardous waste pursuant to Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations.
(b)(1)The department may order the temporary cessation of shredder operations and may prohibit the receipt of additional shredder feedstock by the facility, if the owner or operator fails to develop and implement a fire response plan as required by paragraphs (1) and (2) of subdivision (b) of Section 25095.13. The owner or operator may resume shredder operations and receipt of feedstock immediately upon providing written confirmation to the department that the facility is operating in accordance with a fire response plan.
(2)The department may prohibit the receipt of shredder feedstock at a metal shredding facility on a temporary basis if the owner or operator exceeds the limitations relating to pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13. So long as the owner or operator of the facility has developed and is implementing a fire response plan, the facility may continue to conduct metal shredding operations and metal processing operations to reduce the inventory of shredder feedstock or metal shredder aggregate, as appropriate, and may resume receipt of feedstock at the facility immediately upon providing written confirmation to the department compliance with the limitations on pile size and duration have been achieved.
(c)The department shall conduct an annual compliance evaluation inspection of each metal shredding facility regulated under this chapter. The unified program agency or local environmental health official shall be allowed to participate in the inspection.
25095.61.(a)(1)The department may deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility under this chapter. A denial, revocation, or suspension shall be based on at least one of the following:
(A)Noncompliance with a condition of the applicable permit that results in a significant threat to human health or the environment.
(B)An owner or operators failure in the application or during the approval process to disclose fully all relevant facts or a misrepresentation of any relevant fact at any time.
(C)A determination, supported by substantial evidence, that the permitted activity poses a danger to human health or the environment that can only be addressed by permit denial, modification, suspension, or revocation. In such situations, the department shall either deny, modify, suspend, or revoke a permit. Any modifications made by the department shall be consistent with and necessary to ensure compliance with the requirements of this chapter.
(D)Any cause specified in Section 25186.
(2)The department shall provide notice of any adverse action it proposes to be taken to the owner or operator of the metal shredding facility by certified mail with return receipt requested or by personal service.
(3)An owner or operator who wishes to appeal that adverse action shall appeal by submitting a letter to the department, within 10 days of receipt of notice of the adverse action and requesting a hearing.
(4)Except as provided in paragraph (5), proceedings to appeal any decision made by the department under this chapter, including without limitation required modifications to any plan or other information submitted pursuant to Section 25095.10 and the imposition of site-specific conditions or other operating requirements applicable to a metal shredding facility, shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code. Before initiating an appeal, the owner or operator of a facility shall meet and confer with the department in a good faith effort to resolve the dispute.
(5)Proceedings to appeal the departments decision concerning the denial, modification, revocation or suspension of a permit to operate a metal shredding facility pursuant to this chapter shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code.
(6)Any person who submitted written comments on the draft permit may file an appeal of the departments final permit decision with the Office of Administrative Hearings, pursuant to Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code. An appeal filed pursuant to this paragraph shall be limited to those conditions of the final permit that were included in the persons written comments to the department during the public comment period.
(b)An authorization to operate pursuant to this chapter is contingent upon the accuracy of information contained in the notifications and other documents required to be maintained.
(c)(1)The department shall have primary responsibility for enforcement of the terms of this chapter and may refer violations of this chapter to a district attorney or the Attorney General for prosecution. Notwithstanding this authority, a city attorney, county counsel, district attorney, or the Attorney General may maintain a civil or criminal prosecution consistent with their authority. In addition, nothing in this chapter, and no action taken by the department pursuant to this chapter, shall be construed as a limitation on the right of any person to maintain any civil action otherwise authorized by law.
(2)The department shall inform the local health officer and the director of environmental health of a county, city, or district, and the unified program agency for the jurisdiction, of any unlawful disposal of materials that are regulated under Section 25095.20 or 25095.21 of this chapter, and of any enforcement action undertaken against a metal shredding facility within the unified program agencys jurisdiction as a result of that unlawful disposal. Notice shall be provided within 15 days after the department becomes aware of the violation, and the department shall coordinate with the unified program agency regarding the violation.
25095.62.(a)The department shall deposit all penalties collected pursuant to this chapter into the Toxic Substances Control Account.
(b)Upon appropriation, the funds collected pursuant to subdivision (a) shall be used for the purposes described in Section 25173.6.
SEC. 2.Section 25117 of the Health and Safety Code is amended to read:25117.(a)Except as provided in subdivision (d), hazardous waste means a waste that meets any of the criteria for the identification of a hazardous waste adopted by the department pursuant to Section 25141.
(b)Hazardous waste includes, but is not limited to, RCRA hazardous waste.
(c)Unless expressly provided otherwise, hazardous waste also includes extremely hazardous waste and acutely hazardous waste.
(d)Hazardous waste does not include a material that is not waste pursuant to Section 25095.20 or hazardous waste pursuant to Section 25095.21.
(e)Notwithstanding subdivision (a), in any criminal or civil prosecution brought by a city attorney, county counsel, district attorney, or the Attorney General for violation of this chapter, when it is an element of proof that the person knew or reasonably should have known of the violation, or violated the chapter willfully or with reckless disregard for the risk, or acted intentionally or negligently, the element of proof that the waste is hazardous waste may be satisfied by demonstrating that the waste exhibited the characteristics set forth in subdivision (b) of Section 25141.
SEC. 3.Section 25150.82 of the Health and Safety Code is repealed.SEC. 4.Section 25150.84 of the Health and Safety Code is amended to read:25150.84.(a)The department shall collect an annual fee from all metal shredding facilities that are subject to the requirements of this chapter or to the alternative management standards adopted pursuant to Section 25150.82. The department shall establish and adopt regulations necessary to administer this fee and to establish a fee schedule that is set at a rate sufficient to reimburse the costs of the department and the Office of Environmental Health Hazard Assessment to implement this chapter and Section 41514.6, as applicable to metal shredding facilities. The fee schedule established by the department may be updated periodically as necessary and shall provide for the assessment of no more than the reasonable and necessary costs of the department and the Office of Environmental Health Hazard Assessment to implement this chapter and Section 41514.6, as applicable to metal shredding facilities.
(b)The Controller shall establish a separate subaccount in the Hazardous Waste Control Account. The fees collected pursuant to this section shall be deposited into the subaccount and be available for expenditure by the department or Office of Environmental Health Hazard Assessment upon appropriation by the Legislature.
(c)A regulation adopted pursuant to this section may be adopted as an emergency regulation in accordance with Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, and for the purposes of that chapter, including Section 11349.6 of the Government Code, the adoption of these regulations is an emergency and shall be considered by the Office of Administrative Law as necessary for the immediate preservation of the public peace, health, safety, and general welfare. Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, an emergency regulation adopted by the department pursuant to this section shall be filed with, but not be repealed by, the Office of Administrative Law and shall remain in effect for a period of two years or until revised by the department, whichever occurs sooner.
(d)(1)A metal shredding facility paying an annual fee in accordance with this section shall be exempt from the following fees as the fees pertain to metal shredding activities and the generation, handling, management, transportation, and disposal of metal shredder waste:
(A)A fee imposed pursuant to Section 25205.7.
(B)A disposal fee imposed pursuant to Section 25174.1 until July 1, 2022.
(C)A facility fee imposed pursuant to Section 25205.2.
(D)A fee imposed pursuant to Section 25205.5.
(E)A transportable treatment unit fee imposed pursuant to Section 25205.14 until July 1, 2022, and Section 25205.2 on and after July 1, 2022.
(2)A metal shredding facility is not exempt from the fees listed in paragraph (1) for any other hazardous waste the metal shredding facility generates and handles.
(e)This section shall become inoperative on July 1, 2027, and, as of January 1, 2028, is repealed.
SEC. 5.Section 25150.86 of the Health and Safety Code is repealed.SEC. 6.Section 25150.87 of the Health and Safety Code is amended to read:25150.87.(a)(1)The department shall require metal shredding facilities, as defined in Section 25095.1, that are subject to Section 41514.6 and this section, to do both of the following:
(A)Monitor hazardous waste constituents requested by the department.
(B)Report the results of the monitoring required pursuant to subparagraph (A) to the department. The facilities may also report those results to the local public health department.
(2)The department shall collect and analyze light fibrous material at the fence lines to determine the potential for release of hazardous waste.
(b)All metal shredding facilities subject to this section shall implement the facilitywide fence-line hazardous waste constituent monitoring requirements developed pursuant to this section.
(c)On or before July 1, 2027, the department shall develop a procedure for community notification of the public for the area in which the metal shredding facility is located, if monitoring pursuant to paragraph (1) of subdivision (a) indicates any release of light fibrous material.
(d)On or before January 1, 2027, the department shall develop regulations to implement, interpret, or make specific this section.
(e)The department shall oversee and enforce the implementation of subdivision (a) pursuant to Article 8 (commencing with Section 25180).
(f)Any reasonable regulatory costs incurred by the department in implementing this section may be reimbursed by the fee on metal shredding facilities imposed pursuant to subdivision (a) of Section 25095.50.
SEC. 7.Section 41514.6 of the Health and Safety Code is amended to read:41514.6.(a)On or before January 1, 2027, a district the jurisdiction of which includes metal shredding facilities, in consultation with the Department of Toxic Substances Control and the Office of Environmental Health Hazard Assessment, shall develop requirements for facilitywide fence-line air quality monitoring at metal shredding facilities, as defined in Section 25095.1, that are subject to Section 25095.50 and this section.
(b)The requirements developed pursuant to subdivision (a) shall include, but not be limited to, all of the following:
(1)Development of threshold levels, in consultation with the Office of Environmental Health Hazard Assessment, for airborne contaminants, including, but not limited to, lead, zinc, cadmium, and nickel, at the fence lines of metal shredding facilities that are protective of air quality and public health. The threshold levels shall follow health guidance values adopted by the Office of Environmental Health Hazard Assessment, if available.
(2)Development of threshold levels for community notification of potential adverse impact on public health based on the threshold values developed pursuant to paragraph (1).
(3)Development of actions, in consultation with the Department of Toxic Substances Control, to be taken by metal shredding facilities if threshold levels developed pursuant to paragraph (1) are exceeded, and a method of enforcing those actions.
(4)Development of community notification procedures to inform the public in areas in which the metal shredding facility is located, if the monitoring required pursuant to this subdivision indicates the threshold levels developed pursuant to paragraph (2) were exceeded.
(5)Reporting the results of the monitoring required pursuant to this subdivision to the district and the local public health department.
(c)All metal shredding facilities subject to this section shall implement the facilitywide fence-line air quality monitoring developed pursuant to this section.
(d)On or before July 1, 2027, a district the jurisdiction of which includes metal shredding facilities shall adopt regulations to implement, interpret, or make specific the requirements pursuant to this section.
(e)A district the jurisdiction of which includes metal shredding facilities shall oversee and enforce the compliance of metal shredding facilities with regulations adopted pursuant to subdivision (d).
(f)Any reasonable regulatory costs incurred by a district in implementing this section may be reimbursed pursuant to its fee authority.
(g)The Office of Environmental Health Hazard Assessments costs to implement this section shall be reimbursed from the subaccount established in the Hazardous Waste Control Account pursuant to Section 25095.50.
SEC. 8.The Legislature finds and declares that metal shredding facilities are essential to a thriving circular economy in the State of California and the regulation of those facilities is a matter of statewide concern and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 1 of this act adding Chapter 6.4 (commencing with Section 25095) to Division 20 of the Health and Safety Code applies to all cities, including charter cities.
SEC. 9.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)Metal shredding facilities are essential to a thriving circular economy in the State of California because they provide an efficient, reliable, and effective means of recycling the millions of tons of recyclable metal, including end-of-life vehicles and household appliances, that are generated annually in the state.
(2)Metal shredding facilities enable the recycling of end-of-life metal products and other metal-containing materials by reducing them in size and facilitating the recovery of ferrous and nonferrous metals and other recyclable commodities. These activities conserve energy and natural resources and support the states goal of reducing the emissions of greenhouse gases and combating climate change.
(3)Metal shredding facilities differ in important respects from waste management facilities. For this reason, regulation and oversight of metal shredding facilities are most appropriately addressed through requirements that are specific to the metal shredding industry, and to individual facilities based on their size and nature of operations, while fully protecting human health and the environment. It is the intent of the Legislature that metal shredding facilities be regulated pursuant to this chapter and not Chapter 6.5 (commencing with Section 25100).
(4)The purpose of this chapter is to establish operating standards and other requirements applicable to metal shredding facilities and to resolve ongoing legal disputes over the regulatory status of metal shredding facilities that operate in the state. The department, the metal shredding industry, and neighboring communities would all benefit from clear, enforceable requirements to govern oversight of metal shredding facilities and their operations and to proactively protect public health and the environment.
(5)Metal shredding operations have the potential to release hazardous materials and impact neighboring communities and the environment if the materials are not properly managed.
(6)This chapter does not alter or override the authority of any other federal, state, or local agency with jurisdiction to regulate the activities of a metal shredding facility in accordance with any other applicable law.
(7)This chapter does not impair the rights of any person under any state or federal law.
(b)It is the intent of the Legislature that this chapter be implemented in a manner that achieves all of the following:
(1)Promotes the economic viability of all metal shredding facilities, regardless of size, so as to ensure the continued capacity of the state to manage the large volume of scrap metal that is produced in California every year.
(2)Protects public health and the environment and all communities, including those that have been designated as disadvantaged or vulnerable pursuant to state law.
(3)Does not cause disproportionate and potentially discriminatory impacts on local communities, consistent with Title VI of the federal Civil Rights Act of 1964 (Public Law 88-352) and Section 11135 of the Government Code.
(c)It is the intent of the Legislature that metal shredding facilities be regulated pursuant to this chapter and not Chapter 6.5 (commencing with Section 25100).
2.Definitions and General Provisions25095.1.For purposes of this chapter, the following definitions apply:
(a)Chemically treated metal shredder residue or CTMSR means the waste generated from the processing of shredded metallic materials, which may include, but is not limited to, end-of-life vehicles, appliances, and other metal-containing items, by a metal shredding facility where recoverable ferrous or nonferrous metals have been removed and the remaining metal shredder residue has been treated by a waste stabilization process, as described in this chapter.
(b)Corrective action means all actions necessary to mitigate any public health or environmental threat resulting from a release into the environment of hazardous substances from an operating or closed metal shredding facility and to restore the environmental conditions as necessary to protect human health and the environment.
(c)Department means the Department of Toxic Substances Control.
(d)Effective date means the date that this chapter becomes operative.
(e)Existing metal shredding facility means a metal shredding facility that is conducting metal shredding and metal processing operations as of the date that the act adding this chapter is signed into law by the Governor.
(f)Feeder yard means a metal recycling facility that collects, sorts, or processes scrap metal, through means other than the use of a hammer mill, from which scrap metal is sold to customers or transferred to a metal shredding facility for further processing and recycling.
(g)Feedstock means material received by a metal shredding facility before shredding and processing, including, but not limited to, end-of-life vehicles, household appliances, or other forms of light gauge metal suitable for processing in a metal shredder. Feedstock is often referred to as light iron or tin.
(h)Light fibrous material means a fibrous mixture of nonmetallic materials, including, but not limited to, synthetic fabric and carpet fibers, and entrained metallic particles, often representing the lightest fraction of metal shredder aggregate produced from the shredding of end-of-life vehicles and other metallic items, that is susceptible to dispersal into the environment.
(i)Metal processing operations means the stockpiling and handling of metal shredder aggregate, the operations undertaken to separate, sort, and remove ferrous or nonferrous scrap metal from metal shredder aggregate, and the treatment and storage of metal shredder residue. Metal processing operations does not include shredding, crushing, baling, shearing, cutting, or other metal recycling operations unrelated to the handling of metal shredder aggregate.
(j)Metal products means all ferrous and nonferrous metals that have been removed from metal shredder aggregate or from metal shredder residue.
(k)Metal shredder aggregate means the mixture of shredded metallic and nonmetallic materials that is produced by the shredding of metallic feedstock and that is subsequently processed for the purpose of separating, sorting, and removing ferrous metals, nonferrous metals, or other recyclable commodities from nonrecyclable materials. Metal shredder aggregate does not include (1) metals that have been removed from metal shredder aggregate, or (2) metal shredder residue. Metal shredder aggregate is an in-process material and is not a waste or a hazardous waste.
(l)Metal shredder residue means waste comprising shredded plastics, rubber, glass, foam, fabric, carpet, wood, dirt, or other debris, that remains after recoverable ferrous and nonferrous metals or other recyclable commodities have been separated and removed from metal shredder aggregate. Metal shredder residue does not include chemically treated metal shredder residue.
(m)Metal shredding facility means the entire site under the control of the owner or operator of a facility that uses a stationary or mobile shredder, such as a hammer mill or other shredding technique, to process end-of-life vehicles, appliances, or other metallic feedstock materials in order to facilitate the separation, sorting, or removal of recoverable ferrous or nonferrous metals from nonrecyclable materials. Metal shredding facility does not include a feeder yard or other scrap metal recycling facility that operates a metal crusher, a metal shear, or a metal baler if that facility does not conduct metal shredding operations.
(n)New metal shredding facility means a metal shredding facility that had not commenced metal shredding and metal processing operations as of the effective date.
(o)Operator means the person responsible for the overall operation and management of a metal shredding facility.
(p)Owner means a person who owns a metal shredding facility in whole or in part.
(q)Person means any of the following:
(1)An individual, trust, firm, joint stock company, business concern, partnership, limited liability company, association, or corporation, including, but not limited to, a governmental corporation.
(2)A city, county, district, commission, the state, and any department, agency, or political subdivision thereof.
(3)An interstate body.
(4)The federal government and any department or agency thereof, to the extent permitted by law.
(r)Scrap metal has the same meaning as provided in Section 66260.10 of Title 22 of the California Code of Regulations.
(s)Small metal shredding facility means a facility that processes no more than 250 tons per day or 65,000 tons per year of metallic feedstock materials using a stationary hammer mill and meets each of the following conditions:
(1)The facility does not shred whole end-of-life vehicles, whole agricultural equipment, or whole white goods.
(2)The facility does not conduct on-site chemical treatment of metal shredder residue.
(3)The facility does not conduct any activity that requires the use of an on-site thermal oxidizer.
25095.2.The following facilities are not subject to this chapter:
(a)Facilities that shred only e-waste subject to regulation under Chapter 23 (commencing with Section 66273.1) of Division 4.5 of Title 22 of the California Code of Regulations.
(b)Facilities that shred wood or wood products that may contain ancillary metal components, including, but not limited to, screws, bolts, metal ties, and metal strapping.
(c)Facilities that shred only automotive tires.
(d)A feeder yard or other scrap metal recycling facility that operates a metal crusher, metal shear, or metal baler if that facility does not conduct metal shredding operations.
(e)A metal shredding facility that processes exclusively nonferrous metals that do not contain any nonmetallic materials and whose operations do not produce any metal shredder aggregate or result in the generation of metal shredder residue.
25095.3.Metal shredding facilities that are subject to regulation and comply with this chapter are not hazardous waste facilities. However, this chapter does not alter or override the authority of the department or a unified program agency, as defined in Section 25404, to regulate hazardous waste generated at a metal shredding facility in accordance with Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations.
25095.4.(a)On the effective date, the departments Official Policy and Procedure 88-6, titled Auto Shredder Waste Policy and Procedures dated November 21, 1988, is hereby repealed.
(b)On the effective date, any nonhazardous waste determination issued by the department or its predecessor, the State Department of Health Care Services, to any metal shredding facility pursuant to Section 66260.200(f) of Title 22 of the California Code of Regulations is hereby repealed.
25095.5.A citation or reference in this chapter to a requirement of the regulations in Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations or to a specific provision of Chapter 6.5 (commencing with Section 25100) relating to hazardous waste shall be understood to apply the technical requirements of those regulations or standards to metal processing operations authorized pursuant to this chapter and to the materials processed by those operations, notwithstanding the exclusion of those materials from the definitions of waste and hazardous waste established by this chapter. All citations or references to those requirements shall be to the provision as it read on the effective date.
25095.6.This chapter does not limit the authority of a local air pollution control district or air quality management district, as defined in Section 39025, or the authority of a unified program agency, as defined in Section 25404, or the authority of a local environmental health department that is not a unified program agency to regulate any activity at a metal shredding facility that falls within the scope of the agencys jurisdiction under existing law.
25095.7.The department may adopt regulations as necessary to implement this chapter, and thereafter may update and revise the regulations from time to time, consistent with this chapter. The department shall adopt regulations to implement Section 25095.50, relating to the imposition of fees on metal shredding facilities.
25095.8.Except as otherwise expressly defined or provided in this chapter or regulations implementing this chapter, all terms in this chapter that are defined in Article 2 (commencing with Section 25110) of Chapter 6.5 or its implementing regulations shall have the meaning provided in Article 2 (commencing with Section 25110) of Chapter 6.5 and its implementing regulations.
3.Permits and Operations25095.10.(a)(1)Except as provided in paragraph (2), a metal shredding facility shall not operate in California, unless it has a permit issued by the department.
(2)On and after the effective date, an existing metal shredding facility operating in compliance with the requirements of this chapter, including the provisions of a compliance plan approved by the department pursuant to subdivision (a) of Section 25095.11 and the schedule for any interim measures or controls issued pursuant to subdivision (i) of Section 25095.11, may continue to operate pending final action on a permit application as specified in this section. Without exception, the facility shall have developed and shall continuously implement a fire prevention, detection, and response plan and comply with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13. Except as provided in this section, nothing herein shall prevent the department from taking enforcement action pursuant to Article 8 (commencing with Section 25095.60) before issuance of a final permit.
(3)Any permit approved by the department pursuant to this chapter shall include a reference to all permits issued to the facility by other environmental regulatory agencies. Any action taken by the department pursuant to this chapter shall be consistent with the requirements imposed by those regulatory agencies. The department shall evaluate how to apply to metal shredding facilities its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations as described in subdivisions (b) and (c) of Section 25200.21.
(4)(A)Any permit action shall consider the conclusions and recommendations set forth in a community emissions reduction program prepared pursuant to Section 44391.2 and any other health risk assessment conducted by a local air district pursuant to the Air Toxics Hot Spots Information and Assessment Act of 1987 (Part 6 (commencing with Section 44300) of Division 26) or other applicable law. If an air quality health risk assessment has not been conducted, the owner or operator of the facility shall conduct an analysis of equivalent scope and depth as approved by the local air district.
(B)Before taking final action to issue a permit for a metal shredding facility under this chapter, the department shall determine on the basis of substantial evidence that operation of the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities.
(5)Each permit issued under this chapter shall set forth inspection, entry, monitoring, compliance certification, and reporting requirements to assure compliance with the permit terms and conditions. Any report required to be submitted by a metal shredding facility pursuant to a permit issued under this chapter shall be signed by the owner or operator and shall be certified under penalty of law in the manner specified in Section 66270.11 of Title 22 of the California Code of Regulations.
(b)(1)A person who submitted a hazardous waste facility permit application pursuant to Chapter 6.5 (commencing with Section 25100) to treat metal shredder residue before the effective date may withdraw that application and conduct those treatment operations pursuant to this chapter.
(2)Within 30 days of the effective date, the owner or operator of an existing metal shredding facility shall submit a notice of intent to apply for a permit. Thereafter, the owner or operator of an existing metal shredding facility shall apply to the department for a permit pursuant to this chapter no later than six months following submittal of the notice of intent, except a small metal shredding facility shall apply for a permit no later than one year following submittal of the notice of intent. In all cases, the application shall include all of the following information:
(A)A description of the metal processing operations conducted at the metal shredding facility, including all equipment used for this purpose.
(B)A metal shredding facility inspection plan, as specified in paragraph (3) of subdivision (a) of Section 25095.13 25095.13, including, without limitation, inspection of the area surrounding the hammer mill and all downstream metal processing equipment where light fibrous material is likely to accumulate.
(C)A plan for the prevention, detection, and response to fires that includes, at a minimum, provisions for the continuous monitoring of stockpiles of shredder feedstock and metal shredder aggregate for increases in temperature, periodic fire patrols, regular watering of feedstock and aggregate piles, availability of adequate water supplies, water pressure and fire-fighting equipment at the facility, maintenance of fire lanes, and operator training in fire prevention, detection, and response.
(D)A closure plan.
(E)A metal shredding facility housekeeping plan that includes, but is not limited to, daily cleanup of light fibrous material that is susceptible to dispersal beyond the hammer mill.
(F)An inventory management plan that includes procedures that will be implemented to ensure compliance with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13.
(G)A facility security plan consistent with the requirements of Section 66265.14 of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(H)A preparedness and prevention plan consistent with the requirements of Article 3 (commencing with Section 66265.30) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(I)A contingency plan consistent with the requirements of Article 4 (commencing with Section 66265.50) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(J)A flood plain map, if applicable.
(K)Evidence of financial assurance for closure and third-party liability consistent with the requirements of Article 8 (commencing with Section 66265.140) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(L)A plan describing any offsite or out-of-state transportation and processing of metal shredder aggregate aggregate, including, but not limited to, the estimated amount of material that is transported, the identity and federal Standard Industrial Classification code of the receiving facility, the estimated amounts of metals that are recovered from the material that is transported offsite, the required insurance, and any other information requested by the department to evaluate whether metal recycling operations are being conducted at the receiving facility.
(M)A compliance plan and schedule if required pursuant to subdivision (a) of Section 25095.11.
(N)A training plan that addresses each of the following areas:
(i)Prevention of releases of metal shredder aggregate, including light fibrous material, and metal shredder residue.
(ii)Fire prevention, detection, and suppression.
(iii)Response to natural disasters, such as earthquakes, wildfires, and floods.
(iv)Emergency response procedures and notification.
(v)Inventory management.
(3)The department shall post all information provided by the owner or operator of a metal shredding facility pursuant to paragraph (2) on the departments internet website in a manner that is readily accessible to the public, consistent with exceptions or exemptions under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
(4)The department shall review the permit application submitted pursuant to paragraph (2) of subdivision (b) as expeditiously as possible and shall take final action to approve, modify, or deny the application within three years after the application has been determined to be complete. For purposes of this subdivision, the department shall consider an application to be complete if it includes each of the plans and other information specified in subdivision (a). Failure of the owner or operator to provide a complete permit application within one year shall be grounds for the department to initiate denial of the application, subject to the following:
(A)The three-year period for review of an application may be extended as necessary for completion of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) process.
(B)If the department does not complete the permit process and issue the permit within three years, the department shall provide written notice to the public, setting forth an explanation for the delay, and shall conduct a public meeting upon request.
(C)If the owner or operator of a facility has timely submitted a complete application and responded to any additional requests for information from the department, the facility may continue to operate, subject to all requirements applicable to the facility under this chapter, pending final action on its permit application even if the department does not complete the permit review process within the timeframe specified in this paragraph.
(5)The owner or operator shall comply with the provisions of each plan required under paragraph (2) as approved by the department and incorporated into the permit for the facility. The department shall impose any additional facility-specific conditions that are necessary to ensure compliance with this chapter and for the protection of human health and the environment. The department shall provide the owner or operator of the metal shredding facility with written findings explaining the basis for any such conditions.
(6)In reviewing any plan submitted pursuant to subparagraph (L) of paragraph (2), the department may request additional information from the owner or operator as necessary to determine the legitimacy of the offsite metal processing operations described in the plan, and may require modifications to the plan, or disapprove the plan, if the department determines that the receiving facility is not engaged in legitimate metal recycling.
(7)In considering an application for a metal shredding facility permit submitted pursuant to this subdivision, and the specific terms and conditions to be included in the permit, the department shall consider the site-specific aspects of the metal shredding facility, including, but not limited to:
(A)The nature of the surrounding community and environment.
(B)The results of any community-specific assessment.
(C)The facility size, location, and configuration.
(D)The equipment, enclosures, and infrastructure.
(E)The specific metal processing operations conducted at the metal shredding facility, including types of feedstocks and annual throughput.
(F)Other relevant site-specific characteristics.
(8)The department shall also conduct at least one site visit to the applicants facility after receipt of the permit application.
(c)(1)The owner or operator of a new metal shredding facility shall submit an application to the department for a permit and shall not commence operations at the new metal shredding facility until the department issues a permit.
(2)The application shall consist of both of the following:
(A)All the information described in paragraph (2) of subdivision (b).
(B)Any other information requested by the department relating to construction or operation of the new metal shredding facility.
(d)(1)The approval of an application for an existing or new metal shredding facility shall be considered a discretionary decision subject to the California Environmental Quality Act ((CEQA) Division 13 (commencing with Section 21000) of the Public Resources Code). Nothing in this chapter is intended to modify, restrict, or expand the provisions of CEQA as applied to metal shredding facilities.
(2)The department may require an applicant for a metal shredding facility permit to submit additional information in support of an application.
(e)A permit issued pursuant to this section shall authorize the storage and processing of metal shredder aggregate, and the onsite chemical treatment of metal shredder residue conducted at the metal shredding facility, if chemical treatment of residue is included in the permit application. A metal shredding facility that begins chemical treatment of metal shredder residue for the first time after the effective date shall notify the department no later than 30 days before commencement of treatment operations at the facility and shall provide the department with all information required by this chapter relating to the chemical treatment operations within 120 days of commencement of operations. This section does not require a permit for the operation of a hammer mill or other equipment used at a metal shredding facility that does not involve the handling of metal shredder aggregate or chemical treatment of metal shredder residue.
(f)(1)Any permit for a metal shredding facility approved under this chapter shall be for a fixed term of 10 years, unless the department determines that a shorter term is necessary to protect human health, safety, or the environment or based on the compliance history of the facility.
(2)At least two years before the expiration of a permit, the owner or operator of a metal shredding facility intending to renew the facilitys permit shall submit a complete application for permit renewal, pursuant to this section, that has been updated to reflect the current operations of the facility.
(3)The department shall review the information and either determine the submission is complete or request additional information from the owner or operator. If the application to renew the permit is submitted before the end of the fixed term, the permit shall be deemed extended until the department has taken final action to renew or deny the renewal application and the owner or operator has exhausted all applicable rights of appeal.
(4)When prioritizing pending renewal applications for review and in determining the need for any new conditions on a renewed permit, the department shall consider any input received from the public.
(g)The department shall consider the compliance history of the metal shredding facility, including the requirements of any permit issued by any other agency in reviewing the facilitys application for permit renewal and in considering the need for additional conditions to be included in the permit.
(h)(1)The requirements of this subdivision apply to all permit applicants.
(2)Before the submission of a permit application or application for permit renewal for a metal shredding facility, the applicant shall hold at least one public meeting, or other community engagement activity approved by the department, to inform the community of metal processing activities and any potential impacts to nearby communities and solicit questions and input from the public. The applicant shall prepare a sign-in sheet for the meeting and allow all attendees an opportunity to provide their names and addresses. The public meeting or community engagement activity shall be noticed to the community at least 30 days in advance, using a form of communication preferred by the community, and be held in an accessible location at a convenient time. The applicant shall invite the department and other regulatory agencies with jurisdiction over the metal shredding facility.
(3)The applicant shall submit a summary of the meeting or activity described in paragraph (2), and a list of attendees and their addresses voluntarily provided pursuant to paragraph (2), if any, and copies of any written comments or materials submitted, if any, to the department as a part of the permit application or application for permit renewal. The summary of the pre-application preapplication meeting or activity shall be inclusive of, include, but not be limited to, all of the following:
(A)A summary of the metal shredding facilitys communications to the public about proposed or then current metal processing activities and their potential impacts on nearby communities.
(B)A summary of public input and questions.
(C)Responses to public input and questions and how public input has informed the application materials, if applicable.
(4)After the submission of a complete permit application or application for permit renewal for a facility, and before the public meeting described in paragraph (5), the department shall schedule periodic progress meetings to inform the community of the status of the permitting process, including the owners or operators implementation of any interim measures or controls required by the department pursuant to Section 25095.11. Meetings shall be held pursuant to this paragraph at least once per year and shall be noticed and convened as specified in paragraph (2).
(5)Before a decision is made to approve or deny the application, the department shall solicit comment from the community on the completed application materials and hold a public meeting. The public comment period shall be open for a minimum of 45 days. The department shall respond to all public comments within 60 days of the close of the public comment period. The public comments and the departments responses to the comments shall be included in the administrative record for the permit proceeding and in the departments notice of its intended decision to approve or deny the permit.
(6)Before initiating a public outreach process, the department and the owner or operator of a metal shredding facility shall solicit and incorporate feedback from the surrounding community to determine a locally appropriate process for community engagement.
(i)The department shall post on its internet website general information about each metal shredding facility that has applied for or obtained a permit under this chapter, including without limitation the facilitys current permit status, a schedule for issuance of a draft permit and associated public meetings and opportunity for public comment periods, and a summary of the facilitys compliance history subsequent to the effective date.
(j)The department shall include in the fire response plan for a metal shredding facility any reasonable and necessary additional requirements or conditions that are recommended by the local fire department.
(k)The department, when considering the application for a metal shredding permit for a small metal shredding facility, shall take into consideration the size and nature of the facility when processing the permit application and assessing fees.
25095.11.Notwithstanding Section 25095.10, an owner or operator of a metal shredding facility that has submitted a permit application and is unable to comply with all the requirements of this chapter as of the effective date may continue to operate pending the departments final permit decision, subject to all of the following requirements specified in this section. Failure to meet the requirements of this section shall be subject to enforcement under Article 8 (commencing with Section 25095.60).
(a)(1)The owner or operator identifies in its application each provision of this chapter that the facility is unable to immediately comply with, including including, without limitation limitation, provisions applicable to management of metal shredder aggregate, light fibrous material, and metal shredder residue, and has developed and implemented a plan and schedule approved by the department for achieving compliance with the provisions of this chapter.
(2)Plans shall be submitted along with the permit application required in subdivision (b) of Section 25095.10.
(b)On or before the effective date, the owner or operator complies with the requirements set forth in subdivision (b) of Section 25095.13. A copy of the fire response plan shall be submitted to the department within seven days of the effective date and shall be subject to review and approval of the department after consultation with the facility and the local fire department of the jurisdiction where the facility is located.
(c)On or before the effective date, the owner or operator complies with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13.
(d)The owner or operator initiates, diligently pursues, and implements financial assurance for closure and third-party liability as required pursuant to Section 25095.41, including, but not limited to, both of the following:
(1)The owner or operator submits to the department a cost estimate and closure plan as part of the permit application.
(2)Within 30 days after the permit application is submitted, the owner or operator submits to the department a financial assurance mechanism that is equivalent to the requirements set forth in Sections 66264.143 and 66264.147 of Title 22 of the California Code of Regulations, except that a small metal shredding facility may submit the financial assurance mechanism within 90 days after the permit application is submitted.
(e)The owner or operator initiates and diligently pursues to completion a preliminary endangerment assessment, as required pursuant to Section 25095.30, or otherwise meets the requirements in Section 25095.30 and initiates any required actions identified in the preliminary endangerment assessment.
(f)The owner or operator complies with the standards set forth in Chapter 12 (commencing with Section 66262.10) of Division 4.5 of Title 22 of the California Code of Regulations with respect to all hazardous wastes generated at the facility.
(g)The owner or operator, at a minimum, maintains all existing practices and controls that are in effect or otherwise required by the department, a unified program agency, or a local environmental health department on or before the effective date, that are designed to prevent the possibility of any unplanned sudden or nonsudden release of any of the following into air, soil, or water that could threaten human health or the environment:
(1)In-process materials or components thereof, including metal shredder aggregate and light fibrous material.
(2)Hazardous waste or hazardous waste constituents.
(3)Metal shredder residue.
(4)Chemically treated metal shredder residue.
(h)The owner or operator complies with the following standards:
(1)Containment areas shall be in good condition; if there is a leak, contents shall be immediately transferred.
(2)Accumulation areas shall be inspected at least weekly.
(3)Containment areas shall be visibly labeled with contents and start date of accumulation. If labeling is infeasible, a record of the start dates of accumulation shall be maintained and made available to the public upon request.
(4)Incompatible materials shall not be kept together.
(5)All emergency equipment shall be regularly tested or maintained according to manufacturer standards.
(6)Employees shall have unimpeded access to emergency materials.
(7)There shall be at least one person on premises or on call at all times.
(8)Personnel training shall be required for emergency procedures for all possible emergencies and prevention requirements and shall include job specific and general awareness training.
(i)The owner or operator shall be subject to any interim measures or controls established by the department during consideration of the permit application that are necessary for the protection of human health and the environment. The department shall provide the owner or operator of the metal shredding facility with written findings explaining the basis for those interim requirements and a reasonable schedule for compliance with those measures.
25095.12.The owner or operator of a metal shredding facility shall operate the metal shredding facility in accordance with all of the following requirements:
(a)(1)The metal shredding facility shall be maintained and operated to minimize the possibility of a fire, explosion, or any unplanned sudden or nonsudden release of in-process materials or components thereof, including metal shredder aggregate and light fibrous material, into air, soil, or water that could threaten human health or the environment by implementing all reasonable and feasible operational or engineering methods of control, including, but not limited to, technologies or equipment taking into consideration the size, configuration, and location of the facility, the characteristics of the materials handled, and other relevant factors.
(2)The owner or operator shall take precautions to prevent accidental ignition or reaction of material that exhibits the characteristics of ignitability or reactivity. While ignitable or reactive material is being handled, the owner or operator shall confine smoking and open flame to specially designated locations. No Smoking signs shall be conspicuously placed wherever there is a hazard from ignitable or reactive material.
(3)The transfer, treatment, storage, or disposal of ignitable or reactive material shall be conducted so that it does not do any of the following:
(A)Generate extreme heat or pressure, fire or explosion, or violent reaction.
(B)Produce uncontrolled toxic mists, fumes, dusts, or gases in sufficient quantities to threaten human health or the environment.
(C)Produce uncontrolled flammable fumes or gases in sufficient quantities to pose a risk of fire or explosions.
(D)Damage the structural integrity of the device or facility containing the material.
(E)Any other activity similar to those listed in subparagraphs (A) to (D), inclusive, that threatens human health or the environment.
(b)(1)The owner or operator of the metal shredding facility shall develop and follow an inbound source control policy designed to prevent the shredding of any of the following materials or wastes at the facility:
(A)RCRA hazardous waste, as defined in Section 66261.100 of Title 22 of the California Code of Regulations, and non-RCRA hazardous waste, as defined in Section 66261.101 of Title 22 of the California Code of Regulations.
(B)Asbestos and asbestos-containing materials, except incidental asbestos-containing material that may be contained inside equipment and is not visible upon inspection.
(C)Radioactive materials.
(D)Petroleum-based wastes, including, but not limited to, used oil as defined in Section 25250.1, gasoline, and diesel, but not including non-free-flowing residual quantities of such wastes contained in depolluted vehicles or appliances.
(E)Polychlorinated biphenyls (PCB) materials and wastes, including, but not limited to, capacitors, electrical transformers, and transformer components.
(F)Fluorescent light ballasts, fluorescent lamps, neon, and high-intensity or mercury vapor lights.
(G)Military ordnance, except ordnance designated specifically as Material Designated as Safe (MDAS).
(H)Explosives, explosive residues, fireworks, and other incendiary materials.
(I)Regulated electronic waste.
(J)Mercury containing devices.
(K)Batteries, including, but not limited to, lead-acid batteries and lithium-ion batteries.
(L)Compressed gas cylinders and propane canisters, unless empty and disabled.
(M)Materials requiring special handling, as defined in Section 42167 of the Public Resources Code.
(2)The inbound source control policy shall contain all of the following:
(A)A written description of the load checking protocol designed to prevent materials or wastes identified in paragraph (1) from being shredded at the facility. Incoming feedstock subject to load checking shall not be shredded until the load-checking process has been completed.
(B)A written description of the process for rejecting loads, specific materials, or wastes that contain the materials or wastes identified in paragraph (1).
(C)A plan and template documents used to demonstrate that load checks are conducted and that materials or wastes identified in paragraph (1) are not accepted.
(D)A requirement to maintain all documentation related to the inbound source control policy and load checking the facility for at least five years and provide the documentation to the department upon request.
(E)A written description of a process to make a waste determination pursuant to Section 66262.11 of Title 22 of the California Code of Regulations for any of the materials or wastes listed in paragraph (1) that are identified after completion of the load check process and that were unknowingly accepted by the facility. Any waste determined to be a hazardous waste shall be considered generated at the metal shredding facility and shall be managed as a hazardous waste in accordance with Chapter 6.5 (commencing with Section 25100) and its implementing regulations.
(c)The owner or operator of the metal shredding facility shall develop and implement procedures for any depollution operations that are conducted at the metal shredding facility involving the removal of automotive fuels, lubricating oils, refrigerants, and materials that require special handling, as defined in Section 42167 of the Public Resources Code, including procedures for the proper management of those materials or wastes that are removed during depollution operations, pursuant to Section 25212.
(d)(1)The owner or operator of the metal shredding facility shall maintain all of the following documents at the metal shredding facility:
(A)A written inspection schedule meeting the substantive requirements of subdivision (b) of Section 66265.15 of Title 22 of the California Code of Regulations.
(B)A written description of training documents, including a syllabus or outline, of the type and amount of both introductory and continuing training that has been given to each person at the metal shredding facility.
(C)A contingency plan that contains the information specified in Section 66265.52 of Title 22 of the California Code of Regulations.
(D)A copy of any local air quality management district or air pollution control district permit and other governmental permits or approvals required for operation of the metal shredding facility equipment.
(E)The closure plan required under Section 25095.40.
(F)A copy of documents related to any environmental investigation and any cleanup or other remediation measures implemented at the facility within the last five years.
(G)The housekeeping plan prepared pursuant to Section 25095.13.
(H)Records of offsite transportation of metal shredder aggregate and CTMSR.
(2)The owner or operator shall make the documents described in paragraph (1) available at the metal shredding facility to the department, the United States Environmental Protection Agency, or a local governmental agency upon request.
(e)The owner or operator of a metal shredding facility shall comply with all of the following:
(1)Subdivision (b) of Section 66265.142 of Title 22 of the California Code of Regulations.
(2)The contingency plan as required in subparagraph (C) of paragraph (1) of subdivision (d).
(3)As applicable, Article 3 (commencing with Section 66265.30) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(4)Article 16 (commencing with Section 66265.370) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(f)The owner or operator of a metal shredding facility shall provide notice to the department of an imminent or actual emergency situation, as required by Section 66265.56 of Title 22 of the California Code of Regulations.
(g)The owner or operator of a metal shredding facility shall provide written notice to the department at least 60 days before transferring ownership or operation of the facility.
(h)The owner or operator shall prevent the unknowing entry, and prevent unauthorized entry, of persons or livestock onto the active portion of the facility.
(i)For any new construction at a facility located in a 100-year floodplain or within the maximum high tide, the facility shall take all reasonable and feasible precautions to prevent washout of any hazardous materials.
(j)For any new construction at a facility, the facility shall take all reasonable and feasible precautions to withstand the maximum credible earthquake.
25095.13.The owner or operator of a metal shredding facility shall develop and comply with plans and minimum standards relating to each of the following aspects of the metal processing operation:
(a)The control of releases, including, but not limited to:
(1)Plans for complying with applicable local air quality management district or air pollution control district regulations and permit requirements, including the requirements of any approved emissions minimization plan or comparable plan required by applicable regulations.
(2)A housekeeping plan that is approved by the department and that does all of the following:
(A)Details all measures to control dispersal of metal shredder aggregate and its constituents, including light fibrous material, and metal shredder residue and constituents. Those measures shall include, but are not limited to, mechanical and manual sweeping, washing or cleaning of equipment and structures to remove accumulated debris, application of water using water trucks, sprinklers, spray bars, deluge systems or other dust suppression equipment, fencing, and enclosures.
(B)Specifies the frequency for each measure detailed pursuant to subparagraph (A).
(C)Addresses the disposition of residuals generated from cleaning, including, but not limited to, debris, sweepings, rinse water, and any other material that does not contain recoverable ferrous or nonferrous metal.
(D)Requires the completion of written logs of all housekeeping activities. The written logs shall be maintained in accordance with Section 25095.12.
(E)Requires the management of any light fibrous material that has been released from the facility to be subject to regulation under Chapter 6.5 (commencing with Section 25100).
(3)A metal shredding facility inspection plan that is approved by the department. The metal shredding facility inspection plan shall include all of the following:
(A)Inspection of all facilities and equipment that is used to manage metal shredder aggregate.
(B)A copy of a general inspection schedule that complies, with the specific requirements in Sections 66264.174, 66264.195, 66264.254, 66265.403, and 66264.1101 of Title 22 of the California Code of Regulations, and, as applicable, complies with the specific requirements in subdivision (i) of Section 66264.193, and Sections 66264.195, 66264.226, 66264.273, 66264.303, 66264.602, 66264.1033, 66264.1052, 66264.1053, 66264.1058, 66264.1084, 66264.1085, 66264.1086, 66265.1088, and 66264.1101 of Title 22 of the California Code of Regulations.
(C)All areas where the deposition of metal shredder aggregate, including light fibrous material and metal shredder residue may occur, including accessible areas within 500 feet of the metal shredding facilitys property boundary or further as determined by the department.
(4)An inventory management plan, that is approved by the department, to prevent accumulation of shredder feedstock and metal shredder aggregate and treated or untreated metal shredder residue in excess of the limitations set forth in subparagraph (E) of paragraph (2) of subdivision (b).
(5)Standards for the installation and maintenance of paving with concrete, steel plate, or other surfacing materials approved by the department that are designed to prevent infiltration and to collect and route water to a water management system. The paving shall be inspected quarterly and repaired as needed. The results of the paving inspections and any paving repairs shall be submitted to the department with the annual report and as requested by the department.
(b)(1)A separate written plan for the prevention, detection, and suppression of fires. The plan shall comply with all of the following:
(A)Be shared with local emergency responders.
(B)Be used to monitor metal shredding facility operations for evidence of incipient fire.
(C)Establish procedures for responding to fires of different duration and severity.
(D)Be activated in response to any incident at the metal shredding facility that falls within the scope of the plan.
(2)The plan shall include all of the following:
(A)Procedures for response to incipient fires and access to adequate water, water pressure, firefighting foam, and other supplies at the metal shredding facility that can be used in responding to an incipient or larger fire.
(B)Training of metal shredding facility personnel in the proper use of fire-response equipment and procedures and notification requirements.
(C)Coordination with local fire departments, the unified program agency, if other than the fire department, and other first responders as necessary to support maximum effectiveness in responding to an emergency at the metal shredding facility.
(D)Monitoring of temperatures on all feedstock and metal shredder aggregate piles, using an infrared camera or other equivalent equipment that continuously monitors the temperature of feedstock and aggregate piles and provides an alarm or other indication of temperature increases outside normal range.
(E)Inventory management provisions necessary to prevent the accumulation of feedstock or metal shredder aggregate at the facility in quantities that exceed the reasonable holding capacity of the facility and that cannot be processed within normal operating cycles, including typical periods of breakdown, maintenance, and repair. The following limits shall apply:
(i)No individual stockpile of feedstock shall exceed the amount of material that can be processed within a 24-hour period.
(ii)No individual pile of metal shredder aggregate shall exceed the amount of material that can be processed within a 48-hour period.
(iii)No individual pile of feedstock or metal shredder aggregate shall remain inactive for more than 48 hours except during periods when the facility is closed or not operating. Periods of breakdown, maintenance and repair, or under other circumstances specified in the facilitys approved inventory management plan, shall not be included in calculating the 48-hour period. A pile shall not be considered inactive if the majority of the material in the pile is removed over a period of 48 hours. In the event of an incident that is required to be reported to the department under Section 25095.31, the department may reduce the number of hours that a pile of feedstock or metal shredder aggregate may remain inactive until the owner or operator demonstrates to the satisfaction of the department and the local fire department that the risk of fire has been mitigated.
(iv)During any period of breakdown and associated repair that exceeds 72 hours, the feedstock and metal shredder aggregate piles shall be subject to additional controls as specified in the facilitys approved inventory management plan. Any shredder feedstock accepted by the facility during a period of breakdown, maintenance, or repair exceeding 72 hours shall be managed in accordance with the facilitys approved inventory management plan.
(v)All feedstock and metal shredder aggregate piles shall be subject to continuous 24-hour onsite surveillance, including when the facility is not operating, and such other additional controls specified in the facilitys approved fire response plan. All electronic surveillance data shall be maintained for a period of at least 14 days following any incident that is required to be reported to the department under Section 25095.31.
(F)Provisions for capture and management of fire suppression water as necessary to prevent discharge into storm drains or runoff into surface water.
(G)Requirement for at least one person to be present at the facility or on call at all times.
(3)The department, in coordination with the local fire department of the jurisdiction where the metal shredding facility is located, shall review a facilitys fire response plan on an annual basis and require the owner or operator to update the plan if necessary based on changes in technology or fire prevention practices, or the facilitys compliance history and history of fire, explosion, or release of hazardous waste or hazardous waste constituents.
(c)Stormwater management and control, including, but not limited to:
(1)Containment of stormwater in retention ponds, sumps, tanks, and associated piping or other engineered retention units to minimize free-standing water at the metal shredding facility.
(2)A stormwater testing plan to identify if stormwater exhibits any characteristics of toxicity as described in Section 66261.24 of Title 22 of the California Code of Regulations.
(3)Compliance with the metal shredding facilitys stormwater pollution prevention plan and spill prevention, control, and countermeasures plan.
(4)Discharge of stormwater in accordance with the general permit for discharges of stormwater associated with industrial activities or waste discharge requirements issued by a regional water quality control board, including sampling requirements.
25095.14.(a)Subject to subdivision (b), the owner or operator of a metal shredding facility may make the following physical or operational changes to the metal shredding facility without seeking prior approval from the department:
(1)Throughput increases and increases in maximum operating rate that are authorized or approved by an air quality management district or air pollution control district.
(2)Increases in efficiency of metal processing operations, including, without limitation, sizing, separation, sorting, removal, and recovery.
(3)Changes in design of processing equipment and conveyance systems.
(4)Changes in operations and methods of operation.
(5)Installation and modification of processing and other equipment and conveyance systems.
(6)Repair and replacement of processing and other equipment and conveyance systems.
(7)Decommissioning and removal of equipment and conveyance systems that are no longer in use.
(8)Construction of new structures and enclosures and changes to structures and enclosures.
(9)Installation and modification of abatement equipment and emission control systems.
(10)Installation of and modifications to water reuse and recycling systems.
(11)Installation of and repair to paving.
(12)Any other changes to the metal shredding facility unrelated to the storage or processing of metal shredder aggregate and metal shredder residue.
(b)Except as provided in subdivision (d), the changes described in subdivision (a) may be made without seeking prior approval from the department if the metal shredding facility maintains substantial compliance with this chapter and the owner or operator provides the department with written notice of these changes within 30 days of making the changes. The department shall post the notice on the section of its internet website that provides information regarding metal shredding facilities.
(c)The department shall evaluate the information provided in the notice from the facility pursuant to this subdivision, as well as any objections from the public, to assess whether the modification could result in a potentially significant impact on the environment. If the department determines that the modification could have a potentially significant impact on the environment, the owner or operator of the facility shall be required to implement changes to the modification as necessary to mitigate the impact to the extent feasible.
(d)The owner or operator of a metal shredding facility that proposes to modify the metal shredding facility in a manner that could result in a significant environmental impact from operations that were not considered by the department in reviewing the information submitted pursuant to this article shall provide the department with 60 days advance written notice of the modification and shall not implement the modification without approval from the department. The department shall provide notice of the proposed modification to the public and shall comply with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) in its review of the project.
(e)(1)On or before July 1 of each year, the owner or operator of a metal shredding facility shall submit an annual report to the department describing the material physical or operational changes, if any, made to the metal shredding facility during the previous calendar year relating to the management of metal shredder aggregate or metal shredder residue.
(2)Upon request by the department, the metal shredding facility shall be required to provide additional information about the nature or extent of changes described in the notice provided pursuant to subdivision (b) or the annual report as necessary to demonstrate the metal shredding facilitys ongoing compliance with applicable regulations.
(3)Physical changes to the metal shredding facilitys ongoing operations that are reported to the department in compliance with paragraph (1) may be reviewed and modified by the department as necessary to ensure compliance with the requirements of this chapter.
25095.15.(a)The owner or operator of a metal shredding facility shall manage all metal shredder aggregate during metal processing operations as necessary to achieve the following minimum standards:
(1)All outdoor equipment used for processing metal shredder aggregate shall be enclosed or covered and designed, operated, and maintained to minimize the possibility of the release of light fibrous material into the environment.
(2)All outdoor equipment used for the conveyance of metal shredder aggregate from one location within the metal shredding facility to another location within the metal shredding facility shall be enclosed or covered and designed, operated, and maintained to minimize the possibility of the release of light fibrous material into the environment.
(3)All vehicles used for the outdoor transfer of metal shredder aggregate shall be loaded and unloaded in a manner that minimizes the possibility of the release of metal shredder aggregate, including light fibrous material into the environment.
(b)Metal shredder aggregate shall be stored or accumulated inside a structure that protects the material from exposure to the elements and minimizes the possibility of the release of light fibrous material into the environment. At a minimum, the structure shall meet all of the following requirements:
(1)The structure shall be enclosed with a floor, roof, and walls sufficient to protect the metal shredder aggregate from exposure to the elements and to contain the metal shredder aggregate and any process residues that are managed in the structure.
(2)The roof shall completely cover all areas used for storage or accumulation of metal shredder aggregate.
(3)The floor shall be constructed of concrete surfacing, steel plate, or other surfacing material approved by the department designed to prevent infiltration and collect and route any water that drains from the metal shredder aggregate to a process water management system. The floor shall be inspected on a quarterly basis and repaired as needed. The results of the inspections and any repairs to the floor shall be included in the annual report submitted to the department pursuant to Section 25095.14.
(4)Any liquids that drain from materials stored inside the enclosure shall be collected and routed to the metal shredding facilitys recycled water management system.
(c)Trommel or augers shall be located in a building or otherwise covered or enclosed so as to minimize the possibility of releases.
(d)Subject to written approval by the department, stockpiling of metal shredder aggregate outside the confines of an enclosure required by subdivision (b) may be allowed for limited periods of time if all of the following conditions are met:
(1)The activity is necessary to accommodate unforeseen circumstances or operational disruptions that prevent the material from being stored inside an enclosure. These unforeseen circumstances or operational disruptions shall have been outside the reasonable control of the facility. The facility shall use best efforts to remedy any unforeseen circumstances or operational disruptions that necessitate outdoor stockpiling of metal shredder aggregate.
(2)The operator provides written notice to the department, the unified program agency, and the local fire department at least 24 hours before the need to store material outside arises.
(3)The operator conducts watering or other dust control measures to minimize the possibility of the release of light fibrous material from the stockpile into the environment.
(4)The outdoor stockpiling activity is conducted for 10 or fewer consecutive operating days.
(5)The outdoor stockpiling activity does not begin until approval is provided by the department. The department may rescind the temporary approval for outdoor stockpiling if the facility is not using best efforts to remedy any unforeseen circumstances or operational disruptions that necessitate outdoor stockpiling.
(e)The requirements of this section shall also apply to the management of untreated and treated metal shredder residue.
25095.16.(a)Metal shredder aggregate that is transported to an offsite metal shredding facility or metal recycling facility for purposes of processing shall be tarped or otherwise contained during shipment and transported in a manner that minimizes the possibility of release into the environment.
(b)The metal shredder aggregate shall be shipped directly to the offsite metal processing facility and shall not be handled at any interim location or held at any publicly accessible interim location for more than four hours unless required by hours of service or other applicable law or held by a rail transporter for reasons outside the control of the person arranging for transport.
(c)Each shipment of metal shredder aggregate by truck or rail shall be identified by a standard bill of lading or other shipping document that complies with applicable United States Department of Transportation requirements and that contains all of the following:
(1)The quantity, by weight, of metal shredder aggregate being transported.
(2)The name, physical and mailing addresses, and telephone number of the metal shredding facility that produced the metal shredder aggregate.
(3)The name, physical and mailing addresses, and telephone number of the metal processing facility that will process the metal shredder aggregate.
(4)The date the shipment of metal shredder aggregate leaves the originating metal shredding facility.
(5)The date the shipment of metal shredder aggregate is scheduled to arrive at the receiving metal processing facility.
(6)The name of the transporter that shipped the metal shredder aggregate from the originating metal shredding facility to the receiving metal processing facility.
(d)The originating metal shredding facility shall retain a copy of all shipping documents onsite, in either paper or electronic form, for a period of at least three years. The three-year record retention period may be extended at the direction of the department during the course of any unresolved enforcement action regarding the shipments.
(e)Transporters shall obtain and maintain liability insurance in accordance with Section 34631.5 of the Vehicle Code. A transporter shall cease to transport metal shredder aggregate upon loss of liability coverage.
(f)The owner or operator of the originating facility shall include in the annual report submitted to the department under Section 25095.14 the total tonnage of metal shredder aggregate that was shipped to another recycling facility for processing during the calendar year, the name of each transporter used for this purpose, the bill of lading numbers, and the total tonnage transported by that transporter during the calendar year, and the name and location of the facilities that processed the material. The department shall handle the information in a manner consistent with exceptions or exemptions under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
4.Classification of Materials25095.20.(a)If Except as provided under the applicable provisions of the federal Resource Conservation and Recovery Act of 1976, as amended (42 U.S.C. Sec. 6901 et seq.), if managed in accordance with this chapter, including any plans approved by the department and any additional conditions imposed by the department pursuant to Section 25095.10 or 25095.11, the following materials are not waste, as defined in Section 25124, and shall not be subject to regulation under Chapter 6.5 (commencing with Section 25100) of this division or Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations:
(1)Scrap metal.
(2)Metal shredder aggregate that is managed in either of the following ways:
(A)The metal shredder aggregate is stored and processed at the same metal shredding facility that produced the metal shredder aggregate.
(B)The metal shredder aggregate is transferred to another metal shredding facility or metal recycling facility within federal Standard Industrial Classification Code 5093 for the purpose of processing or further processing the metal shredder aggregate to separate and remove ferrous or nonferrous metals, subject to all of the following:
(i)Either one of the following:
(I)The receiving facility is located in the State of California and operates in accordance with the requirements of this chapter.
(II)The receiving facility is located in a state other than the State of California and is operated in accordance with the law of the state where the receiving facility is located.
(ii)Before transportation offsite, the metal shredder aggregate is managed in accordance with the requirements of the plan approved by the department under subparagraph (L) of paragraph (2) of subdivision (b) of Section 25095.10.
(iii)The receiving facility keeps records of the amount of ferrous and nonferrous scrap metal recovered from the metal shredder aggregate and makes this information available to the department upon request.
(iv)The metal shredder aggregate is transported in accordance with the requirements of Section 25095.16.
(3)Intermediate metal products that are subject to further processing to improve product quality.
(4)Finished ferrous and nonferrous metal commodities scrap metals that are separated or removed from metal shredder aggregate at a metal shredding facility.
(5)Nonmetallic recyclable items recovered from metal shredder aggregate for which a market exists.
(b)Notwithstanding subdivision (a) and any other provision of this chapter, metal shredder aggregate, including light fibrous material, that is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, shall be subject to regulation as hazardous waste under Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations, if it exhibits a characteristic of hazardous waste specified in those regulations.
25095.21.(a)Untreated metal shredder residue that meets the definition of a non-RCRA hazardous waste as defined in Section 66261.101 of Title 22 of the California Code of Regulations shall be chemically treated in accordance with this section or managed in accordance with all applicable requirements of Chapter 6.5 (commencing with Section 25100) and implementing regulations. Chemically treated metal shredder residue is not hazardous waste if all of the following conditions are met:
(1)Unless an alternative treatment recipe is approved by the department, untreated metal shredder residue shall be treated with at least 0.7 gallons of silicate solution per short ton of the untreated metal shredder residue and cement by weight equal to 8.5 percent of the weight of the untreated metal shredder residue.
(2)Metal shredding facilities shall document, on a weekly basis, how many tons of metal shredder residue was treated and how much silicate solution and cement were used in the treatment of the untreated metal shredder residue to comply with paragraph (1).
(3)The chemically treated metal shredder residue does not meet the definition of RCRA hazardous waste, as defined in Section 66261.100 of Title 22 of the California Code of Regulations.
(4)Immediately after waste stabilization, and at all times before offsite transportation and disposal, chemically treated metal shredder residue shall be managed in a manner that prevents releases of chemically treated metal shredder residue outside of a designated accumulation area. The designated accumulation area shall meet the requirements of either of the following:
(A)A self-supporting structure that meets all of the following requirements:
(i)The structure shall be fully or partially enclosed with a floor, at least three walls, and a roof to prevent exposure of the chemically treated metal shredder residue to the elements, including surface transport by precipitation runoff, contamination of soil and groundwater, and wind dispersal outside the enclosure.
(ii)The structure shall be constructed of man-made materials of sufficient strength and thickness to support themselves, the waste contents, any personnel and heavy equipment that operate within the unit, and the stresses of daily operation, such as the movement of personnel, wastes, and handling of equipment within the structure.
(iii)The designated accumulation area shall be labeled or marked clearly with the words Chemically Treated Metal Shredder Residue or CTMSR. The metal shredding facility shall comply with accumulation time limits as required in Section 66262.17 of Title 22 of the California Code of Regulations.
(B)A containment building that meets the requirements of either of the following:
(i)Article 29 (commencing with Section 66264.1100) of Chapter 14 of Title 22 of the California Code of Regulations.
(ii)Article 29 (commencing with Section 66265.1100) of Chapter 15 of Title 22 of the California Code of Regulations.
(b)Chemically treated metal shredder residue shall not be transported to, and shall not be disposed of at, any location other than one of the following:
(1)A composite-lined portion of a solid waste landfill unit that meets all requirements applicable to disposal of municipal solid waste in California after October 9, 1993, based on State Water Resources Control Board Resolution No. 93-62.
(2)A solid waste landfill or other facility that is regulated by waste discharge requirements issued pursuant to Division 7 (commencing with Section 13000) of the Water Code for discharges of designated waste, as defined in Section 13173 of the Water Code, or that allows for the discharge of chemically treated metal shredder residue. The discharge of chemically treated metal shredder residue includes its use as an alternative daily cover or for other beneficial reuse pursuant to Section 41781.3 of the Public Resources Code and the regulations adopted to implement that section.
(3)Any other landfill or location that is authorized by law to receive chemically treated metal shredder residue for disposal or beneficial use.
(c)The transporter of chemically treated metal shredder residue shall comply with all of the following conditions:
(1)Chemically treated metal shredder residue shall be contained and covered during shipment and transported in a manner that prevents any release into the environment.
(2)The transporter shall comply with all applicable United States Department of Transportation shipping requirements.
(3)The vehicle of railcar used to transport chemically treated metal shredder residue shall lack evidence of leakage, spillage, or damage that could cause releases under reasonably foreseeable conditions.
(4)The transporter of chemically treated metal shredder residue shall not transport chemically treated metal shredder residue to a place other than a landfill approved to receive chemically treated metal shredder residue, as described in subdivision (b).
(5)The chemically treated metal shredder residue is not held at any publicly accessible interim location for more than four hours, unless required by other provisions of law, before disposal.
(6)If an unauthorized release of chemically treated metal shredder residue occurs during transportation, the transporter shall immediately contain all releases of chemically treated metal shredder residue and residues from chemically treated metal shredder residue into the environment and determine whether any material resulting from that release is a hazardous waste and, if so, shall manage the hazardous waste in compliance with all applicable requirements of this division. The transporter of chemically treated metal shredder residue is considered the generator of any hazardous waste resulting from the release and is subject to the requirements of Chapter 12 (commencing with Section 66262.10) of Division 4.5 of Title 22 of the California Code of Regulations.
(d)Each shipment of chemically treated metal shredder residue shall be accompanied by a shipping document containing all of the following information:
(1)The quantity, by weight in short tons, of chemically treated metal shredder residue being transported.
(2)The name, physical and mailing addresses, and telephone number of the generating metal shredding facility.
(3)The name, physical and mailing addresses, and telephone number of the destination landfill.
(4)The date the shipment of chemically treated metal shredder residue leaves the metal shredding facility.
(5)The date the shipment of chemically treated metal shredder residue arrives at the destination landfill.
(6)The name and telephone number of the transporter who shipped the chemically treated metal shredder residue from the metal shredding facility to the destination landfill.
(e)The metal shredding facility shall retain onsite a copy of all documentation produced pursuant to this section for at least three years from the date that the chemically treated metal shredder residue that is the subject of the documentation was generated. The department may request the information identified in subdivision (d) in the form of a summary log or a copy of each individual shipping document. The three-year record retention period is automatically extended during the course of any unresolved enforcement action regarding chemically treated metal shredder residue management activity or as requested by the department.
(f)The generating metal shredding facility shall, on or before February 1 of the following year, submit to the department, at the address specified in subdivision (g) of this section, a written annual report containing all of the following information:
(1)The name, physical and mailing addresses, and telephone number of the generating metal shredding facility.
(2)The name, telephone number, and email address of the contact person at the generating metal shredding facility who should be contacted regarding management, transportation, and disposal of chemically treated metal shredder residue.
(3)The name, physical and mailing address, and telephone number for each of the landfills to which the generating metal shredding facility shipped chemically treated metal shredder residue during the previous calendar year.
(4)The total cumulative quantity of chemically treated metal shredder residue, by weight in short tons, shipped to all landfills, and the respective quantity of chemically treated metal shredder residue, by weight in short tons, shipped to each landfill, during the previous calendar year.
(5)The United States Environmental Protection Agency identification number of the generating metal shredding facility.
(g)The metal shredding facility shall provide a copy of any relevant document identified in subdivision (e) upon receipt of a request from the department. Annual reports submitted to the department pursuant to subdivision (f) shall be sent to the following address: Department of Toxic Substances Control, CTMSR Reporting Staff, P.O. Box 806, Sacramento, CA 95812-0806, with the words Attention: CTMSR Annual Report prominently displayed on the front of the envelope.
(h)The owner or operator of a metal shredding facility shall not be required to treat metal shredder residue and shall be exempt from this section if the owner or operator determines, as prescribed in Section 66262.11 of Title 22 of the California Code of Regulations, that the metal shredder residue generated at the facility does not exhibit any state or federal characteristics of hazardous waste, as prescribed in Chapter 11 (commencing with Section 66261.1) of Division 4.5 of Title 22 of the California Code of Regulations.
5.Reporting25095.30.(a)Except as otherwise provided in subdivision (c), within one year after the effective date, the owner or operator of a metal shredding facility shall conduct a preliminary endangerment assessment, as defined in Section 78095, and submit it to the department. The preliminary endangerment assessment shall be conducted in accordance with the most current department guidance manual for evaluating hazardous substance release sites and shall include an evaluation of process areas or locations where releases of materials containing hazardous constituents may have or have occurred, a conceptual site model, and site-specific human health and ecological screening evaluations.
(b)The owner or operator of a metal shredding facility shall conduct appropriate corrective action as needed to address releases of hazardous materials or wastes that pose a significant threat to human health or the environment. This subdivision does not prohibit the department from issuing a corrective action order under Section 25187 subsequent to any investigation of the metal shredding facility.
(c)The owner or operator of a metal shredding facility may demonstrate compliance with this section by providing evidence to the department that, within the last five years, the metal shredding facility has completed an assessment of the metal shredding facility pursuant to an order issued by the department, a regional water quality control board, or any other federal, state, or local agency and is implementing, or has implemented, any corrective action requirements imposed by the agency.
25095.31.(a)The owner or operator of a metal shredding facility shall provide the department with immediate notice of a fire or other incident at the metal shredding facility that requires the assistance of a local fire department or other first responder. This notice shall be in addition to any notice that is required to be made to the Office of Emergency Services pursuant to Section 66265.56 of Title 22 of the California Code of Regulations, the unified program agency, and any other agency under applicable law.
(b)The owner or operator of a metal shredding facility shall establish an effective means of providing public notice to members of the surrounding community upon the occurrence of a fire or other incident that poses a threat to human health or the environment outside of the facility as specified in Section 66265.56 of Title 22 of the California Code of Regulations.
(c)The department shall evaluate how to apply to metal shredding facilities its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations as described in subdivisions (b) and (c) of Section 25200.21.
25095.32.On, On or before July 1, 2030, the Board of Environmental Safety, at a specially scheduled public meeting, shall hear from the department and receive input from members of the public, metal shredding facilities, and other interested stakeholders on the implementation of this chapter. A notice announcing the proposed date, time time, and location of the meeting shall be posted on the boards internet website at least 30 days before the meeting and may be changed by the board if an alternate meeting date or location is determined to be appropriate, which information shall be posted on the boards internet website at least 14 calendar days before the meeting. The board shall also allow remote participation in the meeting. Following the public meeting, the board shall provide the department with any recommendations regarding the implementation and administration of this chapter.
6.Closure25095.40.(a)The owner or operator of a metal shredding facility shall have a written closure plan.
(1)The written closure plan shall address all of the following:
(A)The closure and removal of all feedstock, metal shredder aggregate, and treated and untreated metal shredder residue.
(B)The decontamination of equipment and operating areas used for processing metal shredder aggregate.
(C)The treatment of metal shredder residue and management of chemically treated metal shredder residue.
(2)The written closure plan shall include all of the following:
(A)A description of how the equipment and areas used for processing metal shredder aggregate and for treating metal shredder residue will be closed. The description shall identify the maximum extent of the operation during the life of the equipment or area and how all of the following requirements will be met, if applicable:
(i)Section 66265.114 of Title 22 of the California Code of Regulations.
(ii)Subdivisions (a), (b), and paragraphs (1) and (2) of subdivision (c) of Section 66265.197 of Title 22 of the California Code of Regulations.
(iii)Section 66265.404 of Title 22 of the California Code of Regulations.
(B)An estimate of the maximum inventory of metal shredder aggregate and metal shredder residue in storage and in treatment at any time during the operation of the metal shredding facility.
(C)A description of the steps needed to remove or decontaminate an area, equipment, or structure during partial and final closure, including, but not limited to, procedures for cleaning equipment and removing contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required.
(D)An estimate of the expected year of closure and a schedule for final closure. The schedule for final closure shall include, at minimum, the total time required to close each authorized unit.
(3)The written closure plan shall be subject to approval by the department.
(4)An amendment to the written closure plan shall be done in compliance with subdivision (c) of Section 66265.112 of Title 22 of the California Code of Regulations.
(b)The metal shredder facility shall maintain compliance with both of the following requirements regarding closure:
(1)Subdivisions (a) and (b) of Section 66265.111 of Title 22 of the California Code of Regulations, in the same manner as those provisions apply to metal shredding facilities.
(2)Section 66265.114 of Title 22 of the California Code of Regulations.
(c)Within 90 days after processing the final volume of metal shredder aggregate, the owner or operator shall commence closure of the metal shredding facility in accordance with the written closure plan.
(d)The owner or operator shall complete closure activities in accordance with the written closure plan within 180 days after processing the final volume of metal shredder aggregate unless the owner or operator demonstrates to the department any of the following:
(1)The activities required to complete the closure will require longer than 180 days to complete.
(2)The facility has the capacity to process additional metal shredder aggregate.
(3)There is a reasonable likelihood that a person other than the owner or operator will recommence operation of a unit, the equipment or area, closure of the equipment and area would be incompatible with the operation of the metal shredding facility, and the owner or operator has taken and will continue to take all steps necessary to prevent threats to human health and the environment.
(e)The owner or operator shall notify the department and any other agencies having jurisdiction over the closure project at least 15 days before completion of closure.
(f)The owner or operator shall remain in compliance with all applicable requirements of this chapter until the owner or operator submits to the department or authorized agency a certification signed by the owner or operator and by an independent, professional engineer registered in California that closure has been completed in accordance with the written closure plan and that the written closure plan meets or exceeds the applicable requirements of this chapter.
25095.41.(a)The owner or operator shall provide a closure cost estimate to the department consistent with Section 66265.142 of Title 22 of the California Code of Regulations and based on all of the following factors:
(1)The cost of transporting any unprocessed metal shredder aggregate and metal shredder residue to another metal shredding facility for processing or disposal.
(2)The cost of decontaminating all areas and equipment used for storage and processing of metal shredder aggregate.
(3)The cost of decontaminating all areas and equipment used for treatment and storage of treated or untreated metal shredder residue.
(4)The cost for all closure sampling and analysis confirming decontamination sufficiently meets closure performance standards.
(5)The cost of disposition of the maximum amount of metal shredder aggregate and metal shredder residue that may be present at the metal shredding facility at the time of closure.
(6)The cost of closure certification.
(b)For the purpose of calculating the closure cost estimate, the owner or operator may apply the fair market value of any remaining feedstock and metal shredder aggregate against the estimated cost of closure. In addition, the owner or operator may take into consideration metal shredding facility structures, equipment, and other assets that may continue to be used, sold to third parties, or salvaged for scrap value. The closure cost estimate shall also be determined based on the site-specific aspects of the metal shredding facility, including, without limitation, those site-specific aspects specified in Section 25095.40.
(c)The owner or operator shall provide a financial assurance mechanism for closure of the metal shredding facility using one or more of the financial mechanisms described in Section 66265.143 of Title 22 of the California Code of Regulations.
(d)The owner or operator shall provide a financial assurance mechanism for bodily injury and property damage to third parties caused by sudden accidental occurrences arising from operations of the metal shredding facility. The owner or operator shall have and maintain liability coverage for sudden accidental occurrences in the amount of at least one million dollars ($1,000,000) per occurrence with an annual aggregate of at least two million dollars ($2,000,000), exclusive of legal defense costs. The owner or operator may satisfy the requirements of this subdivision through a financial mechanism identified in Section 66265.147 of Title 22 of the California Code of Regulations.
(e)If the facility is required to implement postclosure care following closure of the facility, the owner or operator shall provide a financial assurance mechanism for postclosure using one or more of the financial mechanisms described in Section 66265.145 of Title 22 of the California Code of Regulations.
7.Fees25095.50.(a)The following definitions shall apply for purposes of this article:
(1)Fee rate means the rate to be set by the department for the 202728 fiscal year, as annually adjusted by the Board of Environmental Safety beginning in the 202829 fiscal year and thereafter pursuant to subdivision (b).
(2)Fee schedule means the fee structure established in regulations by the department pursuant to subdivision (b) using the criteria in subdivision (c).
(b)(1)Beginning in the 202829 fiscal year, the rates established by the department shall be reviewed and shall be increased or decreased annually by the Board of Environmental Safety as necessary and shall provide for the assessment of no more than the reasonable and necessary costs of the department department, the Board of Environmental Safety, and the Office of Environmental Health Hazard Assessment to implement this chapter as described in this section.
(2)The department shall collect an annual fee on all metal shredding facilities that are subject to the requirements of this chapter. The department shall establish and adopt regulations to administer this fee and to establish a fee schedule and rate that is sufficient to cover the departments reasonable costs to implement this chapter and Sections 25150.87 and 41514.6, excluding the costs described in Section 25095.51.
(3)The fee rate shall include, but not be limited to, the costs of fee administration, the costs of collection of the fee, the departments administrative costs, and statewide general administrative costs related to implementation of this chapter and Sections 25150.87 and 41514.6.
(4)The fee rate shall allow for a reserve in the fund each year at an amount sufficient to ensure that all programs funded by the subaccount will not be adversely affected by revenue shortfalls or baseline expenditure adjustments and does not exceed 10 percent of the authorized expenditure levels.
(5)The fees established pursuant to this section shall also be sufficient to cover the Office of Environmental Health Hazard Assessments reasonable costs to implement Sections 25150.87 and 41514.6.
(6)The fees established pursuant to this section shall also be sufficient to cover the reasonable costs incurred by the Board of Environmental Safety in the administration and implementation of its duties and responsibilities established by this chapter.
(c)In establishing a fee schedule that may be imposed on a metal shredding facility pursuant to this section, the department shall consider consider, but is not limited to considering, all of the following factors as they relate to the departments reasonable oversight costs:
(1)The facility-specific permit conditions, if any, developed pursuant to paragraph (5) of subdivision (b) of Section 25095.10.
(2)The size of the facility.
(3)The volume of feedstock that is shredded on an annual basis.
(4)The types of feedstock that are shredded at the facility.
(5)The nature of metal processing operations occurring at the facility. facility, including the types of machinery used.
(6)Whether the facility conducts chemical stabilization of metal shredder residue.
(d)The Controller shall establish a new and separate Metal Shredding Facility Subaccount in the Hazardous Waste Control Account. The Metal Shredding Facility Subaccount shall be administered by the Director of Toxic Substances Control. The fees collected pursuant to this section shall be deposited into the Metal Shredding Facility Subaccount and be available for expenditure by the department department, the Board of Environmental Safety, and the Office of Environmental Health Hazard Assessment, upon appropriation by the Legislature, solely for the purpose of implementation and administration of their respective duties pursuant to this chapter and Sections 25150.87 and 41514.6. The Director of Finance, upon request of the Director of Toxic Substances Control, may make a loan from the General Fund to the Metal Shredding Facility Subaccount to meet cash needs. The loan shall be subject to the repayment provisions of Section 16351 of the Government Code and the interest provisions of Section 16314 of the Government Code.
(e)(1)A regulation adopted pursuant to this section may be adopted as an emergency regulation in accordance with Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, and, for purposes of that chapter, including Section 11349.6 of the Government Code, the adoption of these regulations is an emergency and shall be considered by the Office of Administrative Law as necessary for the immediate preservation of the public peace, health, safety, and general welfare. Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, an emergency regulation adopted by the department or the Board of Environmental Safety pursuant to this section shall be filed with, but not be repealed by, the Office of Administrative Law and shall remain in effect for a period of two years or until revised by the department or the Board of Environmental Safety, whichever occurs sooner.
(2)Before adopting a regulation pursuant to this section, the department shall hold at least two public hearings regarding the proposed regulation, including one public hearing dedicated to assessing the impact of the proposed regulation on small metal shredding facilities as defined in this chapter.
(f)(1)A metal shredding facility paying an annual fee in accordance with this section is not subject to any of the following fees set forth in Chapter 6.5 (commencing with Section 25100), with respect to the production, transportation, and processing of metal shredder aggregate, the generation, handling, and management, transportation, and disposal of nonhazardous metal shredder residue:
(A)A fee imposed pursuant to Section 25205.7.
(B)A facility fee imposed pursuant to Section 25205.2.
(C)A fee imposed pursuant to Section 25205.5.
(2)A metal shredding facility is subject to the fees listed in paragraph (1) for any hazardous waste generated and handled by the metal shredding facility that are ancillary to metal processing operations at the metal shredding facility.
(g)The requirements and procedures in Article 2 (commencing with Section 43471) of Chapter 5 of Part 22 of Division 2 of the Revenue and Taxation Code, excluding Section 43478 of that article, shall apply to the fees paid pursuant to this section and to any claim for refund of fees alleged to have been erroneously or illegally assessed or collected, and any reference to the board or the California Department of Tax and Fee Administration in that article shall instead refer to the department. Any regulations adopted by the department to implement this section shall be consistent with those requirements and procedures.
25095.51.(a)(1)(A)A person who applies for a metal shredding facility permit under this chapter shall enter into a written agreement with the department pursuant to which that person shall reimburse the department for the direct costs reasonably incurred by the department in processing the permit application. The fee amount to be reimbursed by the applicant shall be sufficient to cover the departments costs for review of the permit application, the conduct of public meetings and notices associated with the permit process, and preparation of the permit. The permit fee shall be established on the basis of the same factors listed in subdivision (b) of Section 25095.50.
(B)The fee described in subparagraph (A) shall be in addition to and separate from the annual fee assessed pursuant to Section 25095.50.
(2)An agreement required pursuant to paragraph (1) shall provide for a 25-percent deposit to be made with the submittal of the application. The 25-percent advance payment shall be based upon the departments total estimated costs of processing the application.
(b)(1)Pursuant to Section 21089 of the Public Resources Code, an applicant for a metal shredding facility permit shall also pay all costs incurred by the department for purposes of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), in conjunction with the application.
(2)Paragraph (1) does not apply to projects that are exempt from CEQA.
(c)Funds received pursuant to this section shall be placed in the Metal Shredding Facility Subaccount specified in subdivision (d) of Section 25095.50 and be available for expenditure by the department, upon appropriation by the Legislature, solely for the purposes of implementation and administration of this chapter and Sections 25150.87 and 41514.6.
8.Enforcement25095.60.(a)(1)The authority granted to the department in Article 8 (commencing with Section 25180) of Chapter 6.5 and implementing regulations set forth in Article 3 (commencing with Section 25095.10) of Chapter 22 of Division 4.5 of Title 22 of the California Code of Regulations may be used to enforce this chapter, including, but not limited to, the authority to conduct inspections and pursue administrative or judicial enforcement for violations of this chapter and any implementing regulations, to suspend the authorization of any metal shredding facility that has been determined based on substantial evidence to pose an imminent and substantial endangerment to human health or the environment, and to deny an application for a permit for any of the reasons set forth in paragraph (1) of subdivision (a) of Section 25095.61. These enforcement mechanisms shall apply to violations of this chapter relating to the management of materials listed in subdivision (a) of Sections 25095.20 and 25095.21. Except as provided in paragraph (2), the department shall exercise its enforcement authority under this article in response to any violation of this chapter or of the terms and conditions of a permit issued pursuant to this chapter, and all such enforcement actions shall be deemed to arise under this chapter.
(2)The department has the authority to pursue enforcement under Chapter 6.5 (commencing with Section 25100) for the following violations:
(A)For the operation of a metal shredding facility without having timely submitted a notice of intent and associated operating plans and other information required by paragraph (2) of subdivision (b) of Section 25095.10.
(B)For the operation of a metal shredding facility after a final decision by the department denying or revoking a permit pursuant to this chapter.
(C)For any offsite release of materials listed in Sections 25095.20 and 25095.21 if they meet the criteria of a hazardous waste pursuant to Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations.
(b)(1)The department may order the temporary cessation of shredder operations and may prohibit the receipt of additional shredder feedstock by the facility, if the owner or operator fails to develop and implement a fire response plan as required by paragraphs (1) and (2) of subdivision (b) of Section 25095.13. The owner or operator may resume shredder operations and receipt of feedstock immediately upon providing written confirmation to the department that the facility is operating in accordance with a fire response plan.
(2)The department may prohibit the receipt of shredder feedstock at a metal shredding facility on a temporary basis if the owner or operator exceeds the limitations relating to pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13. So long as the owner or operator of the facility has developed and is implementing a fire response plan, the facility may continue to conduct metal shredding operations and metal processing operations to reduce the inventory of shredder feedstock or metal shredder aggregate, as appropriate, and may resume receipt of feedstock at the facility immediately upon providing written confirmation to the department compliance with the limitations on pile size and duration have been achieved.
(c)The department shall conduct an annual compliance evaluation inspection of each metal shredding facility regulated under this chapter. The unified program agency or local environmental health official shall be allowed to participate in the inspection.
25095.61.(a)(1)The department may deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility under this chapter. A denial, revocation, or suspension shall be based on at least one of the following:
(A)Noncompliance with a condition of the applicable permit that results in a significant threat to human health or the environment.
(B)An owner or operators failure in the application or during the approval process to disclose fully all relevant facts or a misrepresentation of any relevant fact at any time.
(C)A determination, supported by substantial evidence, that the permitted activity poses a danger to human health or the environment that can only be addressed by permit denial, modification, suspension, or revocation. In such situations, the department shall either deny, modify, suspend, or revoke a permit. Any modifications made by the department shall be consistent with and necessary to ensure compliance with the requirements of this chapter.
(D)Any cause specified in Section 25186.
(2)The department shall provide notice of any adverse action it proposes to be taken to the owner or operator of the metal shredding facility by certified mail with return receipt requested or by personal service.
(3)An owner or operator who wishes to appeal that adverse action shall appeal by submitting a letter to the department, within 10 days of receipt of notice of the adverse action and requesting a hearing.
(4)Except as provided in paragraph (5), proceedings to appeal any decision made by the department under this chapter, including without limitation required modifications to any plan or other information submitted pursuant to Section 25095.10 and the imposition of site-specific conditions or other operating requirements applicable to a metal shredding facility, shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code. Before initiating an appeal, the owner or operator of a facility shall meet and confer with the department in a good faith effort to resolve the dispute.
(5)Proceedings to appeal the departments decision concerning the denial, modification, revocation or suspension of a permit to operate a metal shredding facility pursuant to this chapter shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code.
(6)Any person who submitted written comments on the draft permit may file an appeal of the departments final permit decision with the Office of Administrative Hearings, pursuant to Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code. An appeal filed pursuant to this paragraph shall be limited to those conditions of the final permit that were included in the persons written comments to the department during the public comment period.
(b)An authorization to operate pursuant to this chapter is contingent upon the accuracy of information contained in the notifications and other documents required to be maintained.
(c)(1)The department shall have primary responsibility for enforcement of the terms of this chapter and may refer violations of this chapter to a district attorney or the Attorney General for prosecution. Notwithstanding this authority, a city attorney, county counsel, district attorney, or the Attorney General may maintain a civil or criminal prosecution consistent with their authority. In addition, nothing in this chapter, and no action taken by the department pursuant to this chapter, shall be construed as a limitation on the right of any person to maintain any civil action otherwise authorized by law.
(2)The department shall inform the local health officer and the director of environmental health of a county, city, or district, and the unified program agency for the jurisdiction, of any unlawful disposal of materials that are regulated under Section 25095.20 or 25095.21 of this chapter, and of any enforcement action undertaken against a metal shredding facility within the unified program agencys jurisdiction as a result of that unlawful disposal. Notice shall be provided within 15 days after the department becomes aware of the violation, and the department shall coordinate with the unified program agency regarding the violation.
25095.62.(a)The department shall deposit all penalties collected pursuant to this chapter into the Toxic Substances Control Account.
(b)Upon appropriation, the funds collected pursuant to subdivision (a) shall be used for the purposes described in Section 25173.6.
SEC. 2.Section 25117 of the Health and Safety Code is amended to read:25117.(a)Except as provided in subdivision (d), hazardous waste means a waste that meets any of the criteria for the identification of a hazardous waste adopted by the department pursuant to Section 25141.
(b)Hazardous waste includes, but is not limited to, RCRA hazardous waste.
(c)Unless expressly provided otherwise, hazardous waste also includes extremely hazardous waste and acutely hazardous waste.
(d)Hazardous waste does not include a material that is not waste pursuant to Section 25095.20 or hazardous waste pursuant to Section 25095.21.
(e)Notwithstanding subdivision (a), in any criminal or civil prosecution brought by a city attorney, county counsel, district attorney, or the Attorney General for violation of this chapter, when it is an element of proof that the person knew or reasonably should have known of the violation, or violated the chapter willfully or with reckless disregard for the risk, or acted intentionally or negligently, the element of proof that the waste is hazardous waste may be satisfied by demonstrating that the waste exhibited the characteristics set forth in subdivision (b) of Section 25141.
SEC. 3.Section 25150.82 of the Health and Safety Code is repealed.SEC. 4.Section 25150.84 of the Health and Safety Code is repealed.SEC. 4.Section 25150.84 of the Health and Safety Code is amended to read:25150.84.(a)The department shall collect an annual fee from all metal shredding facilities that are subject to the requirements of this chapter or to the alternative management standards adopted pursuant to Section 25150.82. The department shall establish and adopt regulations necessary to administer this fee and to establish a fee schedule that is set at a rate sufficient to reimburse the costs of the department and the Office of Environmental Health Hazard Assessment to implement this chapter and Section 41514.6, as applicable to metal shredding facilities. The fee schedule established by the department may be updated periodically as necessary and shall provide for the assessment of no more than the reasonable and necessary costs of the department and the Office of Environmental Health Hazard Assessment to implement this chapter and Section 41514.6, as applicable to metal shredding facilities.
(b)The Controller shall establish a separate subaccount in the Hazardous Waste Control Account. The fees collected pursuant to this section shall be deposited into the subaccount and be available for expenditure by the department or Office of Environmental Health Hazard Assessment upon appropriation by the Legislature.
(c)A regulation adopted pursuant to this section may be adopted as an emergency regulation in accordance with Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, and for the purposes of that chapter, including Section 11349.6 of the Government Code, the adoption of these regulations is an emergency and shall be considered by the Office of Administrative Law as necessary for the immediate preservation of the public peace, health, safety, and general welfare. Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, an emergency regulation adopted by the department pursuant to this section shall be filed with, but not be repealed by, the Office of Administrative Law and shall remain in effect for a period of two years or until revised by the department, whichever occurs sooner.
(d)(1)A metal shredding facility paying an annual fee in accordance with this section shall be exempt from the following fees as the fees pertain to metal shredding activities and the generation, handling, management, transportation, and disposal of metal shredder waste:
(A)A fee imposed pursuant to Section 25205.7.
(B)A disposal fee imposed pursuant to Section 25174.1 until July 1, 2022.
(C)A facility fee imposed pursuant to Section 25205.2.
(D)A fee imposed pursuant to Section 25205.5.
(E)A transportable treatment unit fee imposed pursuant to Section 25205.14 until July 1, 2022, and Section 25205.2 on and after July 1, 2022.
(2)A metal shredding facility is not exempt from the fees listed in paragraph (1) for any other hazardous waste the metal shredding facility generates and handles.
(e)This section shall become inoperative on July 1, 2027, and, as of January 1, 2028, is repealed.
SEC. 5.Section 25150.86 of the Health and Safety Code is repealed.SEC. 6.Section 25150.87 of the Health and Safety Code is amended to read:25150.87.(a)(1)The department shall require metal shredding facilities, as defined in Section 25095.1, that are subject to Section 41514.6 and this section, to do both of the following:
(A)Monitor hazardous waste constituents requested by the department.
(B)Report the results of the monitoring required pursuant to subparagraph (A) to the department. The facilities may also report those results to the local public health department.
(2)The department shall collect and analyze light fibrous material at the fence lines to determine the potential for release of hazardous waste.
(b)All metal shredding facilities subject to this section shall implement the facilitywide fence-line hazardous waste constituent monitoring requirements developed pursuant to this section.
(c)On or before July 1, 2027, the department shall develop a procedure for community notification of the public for the area in which the metal shredding facility is located, if monitoring pursuant to paragraph (1) of subdivision (a) indicates any release of light fibrous material.
(d)On or before January 1, 2027, the department shall develop regulations to implement, interpret, or make specific this section.
(e)The department shall oversee and enforce the implementation of subdivision (a) pursuant to Article 8 (commencing with Section 25180).
(f)Any reasonable regulatory costs incurred by the department in implementing this section may be reimbursed by the fee on metal shredding facilities imposed pursuant to subdivision (a) of Section 25095.50.
SEC. 7.Section 41514.6 of the Health and Safety Code is amended to read:41514.6.(a)On or before January 1, 2027, a district the jurisdiction of which includes metal shredding facilities, in consultation with the Department of Toxic Substances Control and the Office of Environmental Health Hazard Assessment, shall develop requirements for facilitywide fence-line air quality monitoring at metal shredding facilities, as defined in Section 25095.1, that are subject to Section 25095.50 and this section.
(b)The requirements developed pursuant to subdivision (a) shall include, but not be limited to, all of the following:
(1)Development of threshold levels, in consultation with the Office of Environmental Health Hazard Assessment, for airborne contaminants, including, but not limited to, lead, zinc, cadmium, and nickel, at the fence lines of metal shredding facilities that are protective of air quality and public health. The threshold levels shall follow health guidance values adopted by the Office of Environmental Health Hazard Assessment, if available.
(2)Development of threshold levels for community notification of potential adverse impact on public health based on the threshold values developed pursuant to paragraph (1).
(3)Development of actions, in consultation with the Department of Toxic Substances Control, to be taken by metal shredding facilities if threshold levels developed pursuant to paragraph (1) are exceeded, and a method of enforcing those actions.
(4)Development of community notification procedures to inform the public in areas in which the metal shredding facility is located, if the monitoring required pursuant to this subdivision indicates the threshold levels developed pursuant to paragraph (2) were exceeded.
(5)Reporting the results of the monitoring required pursuant to this subdivision to the district and the local public health department.
(c)All metal shredding facilities subject to this section shall implement the facilitywide fence-line air quality monitoring developed pursuant to this section.
(d)On or before July 1, 2027, a district the jurisdiction of which includes metal shredding facilities shall adopt regulations to implement, interpret, or make specific the requirements pursuant to this section.
(e)A district the jurisdiction of which includes metal shredding facilities shall oversee and enforce the compliance of metal shredding facilities with regulations adopted pursuant to subdivision (d).
(f)Any reasonable regulatory costs incurred by a district in implementing this section may be reimbursed pursuant to its fee authority.
(g)The Office of Environmental Health Hazard Assessments costs to implement this section shall be reimbursed from the subaccount established in the Hazardous Waste Control Account pursuant to Section 25095.50.
SEC. 8.The Legislature finds and declares that metal shredding facilities are essential to a thriving circular economy in the State of California and the regulation of those facilities is a matter of statewide concern and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 1 of this act adding Chapter 6.4 (commencing with Section 25095) to Division 20 of the Health and Safety Code applies to all cities, including charter cities.
SEC. 9.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)Metal shredding facilities are essential to a thriving circular economy in the State of California because they provide an efficient, reliable, and effective means of recycling the millions of tons of recyclable metal, including end-of-life vehicles and household appliances, that are generated annually in the state.
(2)Metal shredding facilities enable the recycling of end-of-life metal products and other metal-containing materials by reducing them in size and facilitating the recovery of ferrous and nonferrous metals and other recyclable commodities. These activities conserve energy and natural resources and support the states goal of reducing the emissions of greenhouse gases and combating climate change.
(3)Metal shredding facilities differ in important respects from waste management facilities. For this reason, regulation and oversight of metal shredding facilities are most appropriately addressed through requirements that are specific to the metal shredding industry, and to individual facilities based on their size and nature of operations, while fully protecting human health and the environment. It is the intent of the Legislature that metal shredding facilities be regulated pursuant to this chapter and not Chapter 6.5 (commencing with Section 25100).
(4)The purpose of this chapter is to establish operating standards and other requirements applicable to metal shredding facilities and to resolve ongoing legal disputes over the regulatory status of metal shredding facilities that operate in the state. The department, the metal shredding industry, and neighboring communities would all benefit from clear, enforceable requirements to govern oversight of metal shredding facilities and their operations and to proactively protect public health and the environment.
(5)Metal shredding operations have the potential to release hazardous materials and impact neighboring communities and the environment if the materials are not properly managed.
(6)This chapter does not alter or override the authority of any other federal, state, or local agency with jurisdiction to regulate the activities of a metal shredding facility in accordance with any other applicable law.
(7)This chapter does not impair the rights of any person under any state or federal law.
(b)It is the intent of the Legislature that this chapter be implemented in a manner that achieves all of the following:
(1)Promotes the economic viability of all metal shredding facilities, regardless of size, so as to ensure the continued capacity of the state to manage the large volume of scrap metal that is produced in California every year.
(2)Protects public health and the environment and all communities, including those that have been designated as disadvantaged or vulnerable pursuant to state law.
(3)Does not cause disproportionate and potentially discriminatory impacts on local communities, consistent with Title VI of the federal Civil Rights Act of 1964 (Public Law 88-352) and Section 11135 of the Government Code.
2.Definitions and General Provisions25095.1.For purposes of this chapter, the following definitions apply:
(a)Chemically treated metal shredder residue or CTMSR means the waste generated from the processing of shredded metallic materials, which may include, but is not limited to, end-of-life vehicles, appliances, and other metal-containing items, by a metal shredding facility where recoverable ferrous or nonferrous metals have been removed and the remaining metal shredder residue has been treated by a waste stabilization process, as described in this chapter.
(b)Corrective action means all actions necessary to mitigate any public health or environmental threat resulting from a release into the environment of hazardous substances from an operating or closed metal shredding facility and to restore the environmental conditions as necessary to protect human health and the environment.
(c)Department means the Department of Toxic Substances Control.
(d)Effective date means the date that this chapter becomes operative.
(e)Existing metal shredding facility means a metal shredding facility that is conducting metal shredding and metal processing operations as of the date that the act adding this chapter is signed into law by the Governor.
(f)Feeder yard means a metal recycling facility that collects, sorts, or processes scrap metal, through means other than the use of a hammer mill, from which scrap metal is sold to customers or transferred to a metal shredding facility for further processing and recycling.
(g)Feedstock means material received by a metal shredding facility before shredding and processing, including, but not limited to, end-of-life vehicles, household appliances, or other forms of light gauge metal suitable for processing in a metal shredder. Feedstock is often referred to as light iron or tin.
(h)Light fibrous material means a fibrous mixture of nonmetallic materials, including, but not limited to, synthetic fabric and carpet fibers, and entrained metallic particles, often representing the lightest fraction of metal shredder aggregate produced from the shredding of end-of-life vehicles and other metallic items, that is susceptible to dispersal into the environment.
(i)Metal processing operations means the stockpiling and handling of metal shredder aggregate, the operations undertaken to separate, sort, and remove ferrous or nonferrous scrap metal from metal shredder aggregate, and the treatment and storage of metal shredder residue. Metal processing operations does not include shredding, crushing, baling, shearing, cutting, or other metal recycling operations unrelated to the handling of metal shredder aggregate.
(j)Metal products means all ferrous and nonferrous metals that have been removed from metal shredder aggregate or from metal shredder residue.
(k)Metal shredder aggregate means the mixture of shredded metallic and nonmetallic materials that is produced by the shredding of metallic feedstock and that is subsequently processed for the purpose of separating, sorting, and removing ferrous metals, nonferrous metals, or other recyclable commodities from nonrecyclable materials. Metal shredder aggregate does not include (1) metals that have been removed from metal shredder aggregate, or (2) metal shredder residue. Metal shredder aggregate is an in-process material and is not a waste or a hazardous waste.
(l)Metal shredder residue means waste comprising shredded plastics, rubber, glass, foam, fabric, carpet, wood, dirt, or other debris, that remains after recoverable ferrous and nonferrous metals or other recyclable commodities have been separated and removed from metal shredder aggregate. Metal shredder residue does not include chemically treated metal shredder residue.
(m)Metal shredding facility means the entire site under the control of the owner or operator of a facility that uses a stationary or mobile shredder, such as a hammer mill or other shredding technique, to process end-of-life vehicles, appliances, or other metallic feedstock materials in order to facilitate the separation, sorting, or removal of recoverable ferrous or nonferrous metals from nonrecyclable materials. Metal shredding facility does not include a feeder yard or other scrap metal recycling facility that operates a metal crusher, a metal shear, or a metal baler if that facility does not conduct metal shredding operations.
(n)New metal shredding facility means a metal shredding facility that had not commenced metal shredding and metal processing operations as of the effective date.
(o)Operator means the person responsible for the overall operation and management of a metal shredding facility.
(p)Owner means a person who owns a metal shredding facility in whole or in part.
(q)Person means any of the following:
(1)An individual, trust, firm, joint stock company, business concern, partnership, limited liability company, association, or corporation, including, but not limited to, a governmental corporation.
(2)A city, county, district, commission, the state, and any department, agency, or political subdivision thereof.
(3)An interstate body.
(4)The federal government and any department or agency thereof, to the extent permitted by law.
(r)Scrap metal has the same meaning as provided in Section 66260.10 of Title 22 of the California Code of Regulations.
(s)Small metal shredding facility means a facility that processes no more than 250 tons per day or 65,000 tons per year of metallic feedstock materials using a stationary hammer mill and meets each of the following conditions:
(1)The facility does not shred whole end-of-life vehicles, whole agricultural equipment, or whole white goods.
(2)The facility does not conduct on-site chemical treatment of metal shredder residue.
(3)The facility does not conduct any activity that requires the use of an on-site thermal oxidizer.
25095.2.The following facilities are not subject to this chapter:
(a)Facilities that shred only e-waste subject to regulation under Chapter 23 (commencing with Section 66273.1) of Division 4.5 of Title 22 of the California Code of Regulations.
(b)Facilities that shred wood or wood products that may contain ancillary metal components, including, but not limited to, screws, bolts, metal ties, and metal strapping.
(c)Facilities that shred only automotive tires.
(d)A feeder yard or other scrap metal recycling facility that operates a metal crusher, metal shear, or metal baler if that facility does not conduct metal shredding operations.
(e)A metal shredding facility that processes exclusively nonferrous metals that do not contain any nonmetallic materials and whose operations do not produce any metal shredder aggregate or result in the generation of metal shredder residue.
25095.3.Metal shredding facilities that are subject to regulation and comply with this chapter are not hazardous waste facilities. However, this chapter does not alter or override the authority of the department or a unified program agency, as defined in Section 25404, to regulate hazardous waste generated at a metal shredding facility in accordance with Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations.
25095.4.(a)On the effective date, the departments Official Policy and Procedure 88-6, titled Auto Shredder Waste Policy and Procedures dated November 21, 1988, is hereby repealed.
(b)On the effective date, any nonhazardous waste determination issued by the department or its predecessor, the State Department of Health Care Services, to any metal shredding facility pursuant to Section 66260.200(f) of Title 22 of the California Code of Regulations is hereby repealed.
25095.5.A citation or reference in this chapter to a requirement of the regulations in Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations or to a specific provision of Chapter 6.5 (commencing with Section 25100) relating to hazardous waste shall be understood to apply the technical requirements of those regulations or standards to metal processing operations authorized pursuant to this chapter and to the materials processed by those operations, notwithstanding the exclusion of those materials from the definitions of waste and hazardous waste established by this chapter. All citations or references to those requirements shall be to the provision as it read on the effective date.
25095.6.This chapter does not limit the authority of a local air pollution control district or air quality management district, as defined in Section 39025, or the authority of a unified program agency, as defined in Section 25404, or the authority of a local environmental health department that is not a unified program agency to regulate any activity at a metal shredding facility that falls within the scope of the agencys jurisdiction under existing law.
25095.7.The department may adopt regulations as necessary to implement this chapter, and thereafter may update and revise the regulations from time to time, consistent with this chapter. The department shall adopt regulations to implement Section 25095.50, relating to the imposition of fees on metal shredding facilities.
25095.8.Except as otherwise expressly defined or provided in this chapter or regulations implementing this chapter, all terms in this chapter that are defined in Article 2 (commencing with Section 25110) of Chapter 6.5 or its implementing regulations shall have the meaning provided in Article 2 (commencing with Section 25110) of Chapter 6.5 and its implementing regulations.
3.Permits and Operations25095.10.(a)(1)Except as provided in paragraph (2), a metal shredding facility shall not operate in California, unless it has a permit issued by the department.
(2)On and after the effective date, an existing metal shredding facility operating in compliance with the requirements of this chapter, including the provisions of a compliance plan approved by the department pursuant to subdivision (a) of Section 25095.11 and the schedule for any interim measures or controls issued pursuant to subdivision (i) of Section 25095.11, may continue to operate pending final action on a permit application as specified in this section. Without exception, the facility shall have developed and shall continuously implement a fire prevention, detection, and response plan and comply with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13. Except as provided in this section, nothing herein shall prevent the department from taking enforcement action pursuant to Article 8 (commencing with Section 25095.60) before issuance of a final permit.
(3)Any permit approved by the department pursuant to this chapter shall include a reference to all permits issued to the facility by other environmental regulatory agencies. Any action taken by the department pursuant to this chapter shall be consistent with the requirements imposed by those regulatory agencies. The department shall evaluate how to apply to metal shredding facilities its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations as described in subdivisions (b) and (c) of Section 25200.21.
(4)(A)Any permit action shall consider the conclusions and recommendations set forth in a community emissions reduction program prepared pursuant to Section 44391.2 and any other health risk assessment conducted by a local air district pursuant to the Air Toxics Hot Spots Information and Assessment Act of 1987 (Part 6 (commencing with Section 44300) of Division 26) or other applicable law. If an air quality health risk assessment has not been conducted, the owner or operator of the facility shall conduct an analysis of equivalent scope and depth as approved by the local air district.
(B)Before taking final action to issue a permit for a metal shredding facility under this chapter, the department shall determine on the basis of substantial evidence that operation of the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities.
(5)Each permit issued under this chapter shall set forth inspection, entry, monitoring, compliance certification, and reporting requirements to assure compliance with the permit terms and conditions. Any report required to be submitted by a metal shredding facility pursuant to a permit issued under this chapter shall be signed by the owner or operator and shall be certified under penalty of law in the manner specified in Section 66270.11 of Title 22 of the California Code of Regulations.
(b)(1)A person who submitted a hazardous waste facility permit application pursuant to Chapter 6.5 (commencing with Section 25100) to treat metal shredder residue before the effective date may withdraw that application and conduct those treatment operations pursuant to this chapter.
(2)Within 30 days of the effective date, the owner or operator of an existing metal shredding facility shall submit a notice of intent to apply for a permit. Thereafter, the owner or operator of an existing metal shredding facility shall apply to the department for a permit pursuant to this chapter no later than six months following submittal of the notice of intent, except a small metal shredding facility shall apply for a permit no later than one year following submittal of the notice of intent. In all cases, the application shall include all of the following information:
(A)A description of the metal processing operations conducted at the metal shredding facility, including all equipment used for this purpose.
(B)A metal shredding facility inspection plan, as specified in paragraph (3) of subdivision (a) of Section 25095.13 including, without limitation, inspection of the area surrounding the hammer mill and all downstream metal processing equipment where light fibrous material is likely to accumulate.
(C)A plan for the prevention, detection, and response to fires that includes, at a minimum, provisions for the continuous monitoring of stockpiles of shredder feedstock and metal shredder aggregate for increases in temperature, periodic fire patrols, regular watering of feedstock and aggregate piles, availability of adequate water supplies, water pressure and fire-fighting equipment at the facility, maintenance of fire lanes, and operator training in fire prevention, detection, and response.
(D)A closure plan.
(E)A metal shredding facility housekeeping plan that includes, but is not limited to, daily cleanup of light fibrous material that is susceptible to dispersal beyond the hammer mill.
(F)An inventory management plan that includes procedures that will be implemented to ensure compliance with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13.
(G)A facility security plan consistent with the requirements of Section 66265.14 of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(H)A preparedness and prevention plan consistent with the requirements of Article 3 (commencing with Section 66265.30) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(I)A contingency plan consistent with the requirements of Article 4 (commencing with Section 66265.50) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(J)A flood plain map, if applicable.
(K)Evidence of financial assurance for closure and third-party liability consistent with the requirements of Article 8 (commencing with Section 66265.140) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(L)A plan describing any offsite or out-of-state transportation and processing of metal shredder aggregate including, but not limited to, the estimated amount of material that is transported, the identity and federal Standard Industrial Classification code of the receiving facility, the estimated amounts of metals that are recovered from the material that is transported offsite, the required insurance, and any other information requested by the department to evaluate whether metal recycling operations are being conducted at the receiving facility.
(M)A compliance plan and schedule if required pursuant to subdivision (a) of Section 25095.11.
(N)A training plan that addresses each of the following areas:
(i)Prevention of releases of metal shredder aggregate, including light fibrous material, and metal shredder residue.
(ii)Fire prevention, detection, and suppression.
(iii)Response to natural disasters, such as earthquakes, wildfires, and floods.
(iv)Emergency response procedures and notification.
(v)Inventory management.
(3)The department shall post all information provided by the owner or operator of a metal shredding facility pursuant to paragraph (2) on the departments internet website in a manner that is readily accessible to the public, consistent with exceptions or exemptions under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
(4)The department shall review the permit application submitted pursuant to paragraph (2) of subdivision (b) as expeditiously as possible and shall take final action to approve, modify, or deny the application within three years after the application has been determined to be complete. For purposes of this subdivision, the department shall consider an application to be complete if it includes each of the plans and other information specified in subdivision (a). Failure of the owner or operator to provide a complete permit application within one year shall be grounds for the department to initiate denial of the application, subject to the following:
(A)The three-year period for review of an application may be extended as necessary for completion of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) process.
(B)If the department does not complete the permit process and issue the permit within three years, the department shall provide written notice to the public, setting forth an explanation for the delay, and shall conduct a public meeting upon request.
(C)If the owner or operator of a facility has timely submitted a complete application and responded to any additional requests for information from the department, the facility may continue to operate, subject to all requirements applicable to the facility under this chapter, pending final action on its permit application even if the department does not complete the permit review process within the timeframe specified in this paragraph.
(5)The owner or operator shall comply with the provisions of each plan required under paragraph (2) as approved by the department and incorporated into the permit for the facility. The department shall impose any additional facility-specific conditions that are necessary to ensure compliance with this chapter and for the protection of human health and the environment. The department shall provide the owner or operator of the metal shredding facility with written findings explaining the basis for any such conditions.
(6)In reviewing any plan submitted pursuant to subparagraph (L) of paragraph (2), the department may request additional information from the owner or operator as necessary to determine the legitimacy of the offsite metal processing operations described in the plan, and may require modifications to the plan, or disapprove the plan, if the department determines that the receiving facility is not engaged in legitimate metal recycling.
(7)In considering an application for a metal shredding facility permit submitted pursuant to this subdivision, and the specific terms and conditions to be included in the permit, the department shall consider the site-specific aspects of the metal shredding facility, including, but not limited to:
(A)The nature of the surrounding community and environment.
(B)The results of any community-specific assessment.
(C)The facility size, location, and configuration.
(D)The equipment, enclosures, and infrastructure.
(E)The specific metal processing operations conducted at the metal shredding facility, including types of feedstocks and annual throughput.
(F)Other relevant site-specific characteristics.
(8)The department shall also conduct at least one site visit to the applicants facility after receipt of the permit application.
(c)(1)The owner or operator of a new metal shredding facility shall submit an application to the department for a permit and shall not commence operations at the new metal shredding facility until the department issues a permit.
(2)The application shall consist of both of the following:
(A)All the information described in paragraph (2) of subdivision (b).
(B)Any other information requested by the department relating to construction or operation of the new metal shredding facility.
(d)(1)The approval of an application for an existing or new metal shredding facility shall be considered a discretionary decision subject to the California Environmental Quality Act ((CEQA) Division 13 (commencing with Section 21000) of the Public Resources Code). Nothing in this chapter is intended to modify, restrict, or expand the provisions of CEQA as applied to metal shredding facilities.
(2)The department may require an applicant for a metal shredding facility permit to submit additional information in support of an application.
(e)A permit issued pursuant to this section shall authorize the storage and processing of metal shredder aggregate, and the onsite chemical treatment of metal shredder residue conducted at the metal shredding facility, if chemical treatment of residue is included in the permit application. A metal shredding facility that begins chemical treatment of metal shredder residue for the first time after the effective date shall notify the department no later than 30 days before commencement of treatment operations at the facility and shall provide the department with all information required by this chapter relating to the chemical treatment operations within 120 days of commencement of operations. This section does not require a permit for the operation of a hammer mill or other equipment used at a metal shredding facility that does not involve the handling of metal shredder aggregate or chemical treatment of metal shredder residue.
(f)(1)Any permit for a metal shredding facility approved under this chapter shall be for a fixed term of 10 years, unless the department determines that a shorter term is necessary to protect human health, safety, or the environment or based on the compliance history of the facility.
(2)At least two years before the expiration of a permit, the owner or operator of a metal shredding facility intending to renew the facilitys permit shall submit a complete application for permit renewal, pursuant to this section, that has been updated to reflect the current operations of the facility.
(3)The department shall review the information and either determine the submission is complete or request additional information from the owner or operator. If the application to renew the permit is submitted before the end of the fixed term, the permit shall be deemed extended until the department has taken final action to renew or deny the renewal application and the owner or operator has exhausted all applicable rights of appeal.
(4)When prioritizing pending renewal applications for review and in determining the need for any new conditions on a renewed permit, the department shall consider any input received from the public.
(g)The department shall consider the compliance history of the metal shredding facility, including the requirements of any permit issued by any other agency in reviewing the facilitys application for permit renewal and in considering the need for additional conditions to be included in the permit.
(h)(1)The requirements of this subdivision apply to all permit applicants.
(2)Before the submission of a permit application or application for permit renewal for a metal shredding facility, the applicant shall hold at least one public meeting, or other community engagement activity approved by the department, to inform the community of metal processing activities and any potential impacts to nearby communities and solicit questions and input from the public. The applicant shall prepare a sign-in sheet for the meeting and allow all attendees an opportunity to provide their names and addresses. The public meeting or community engagement activity shall be noticed to the community at least 30 days in advance, using a form of communication preferred by the community, and be held in an accessible location at a convenient time. The applicant shall invite the department and other regulatory agencies with jurisdiction over the metal shredding facility.
(3)The applicant shall submit a summary of the meeting or activity described in paragraph (2), and a list of attendees and their addresses voluntarily provided pursuant to paragraph (2), if any, and copies of any written comments or materials submitted, if any, to the department as a part of the permit application or application for permit renewal. The summary of the pre-application meeting or activity shall be inclusive of, but not limited to, all of the following:
(A)A summary of the metal shredding facilitys communications to the public about proposed or then current metal processing activities and their potential impacts on nearby communities.
(B)A summary of public input and questions.
(C)Responses to public input and questions and how public input has informed the application materials, if applicable.
(4)After the submission of a complete permit application or application for permit renewal for a facility, and before the public meeting described in paragraph (5), the department shall schedule periodic progress meetings to inform the community of the status of the permitting process, including the owners or operators implementation of any interim measures or controls required by the department pursuant to Section 25095.11. Meetings shall be held pursuant to this paragraph at least once per year and shall be noticed and convened as specified in paragraph (2).
(5)Before a decision is made to approve or deny the application, the department shall solicit comment from the community on the completed application materials and hold a public meeting. The public comment period shall be open for a minimum of 45 days. The department shall respond to all public comments within 60 days of the close of the public comment period. The public comments and the departments responses to the comments shall be included in the administrative record for the permit proceeding and in the departments notice of its intended decision to approve or deny the permit.
(6)Before initiating a public outreach process, the department and the owner or operator of a metal shredding facility shall solicit and incorporate feedback from the surrounding community to determine a locally appropriate process for community engagement.
(i)The department shall post on its internet website general information about each metal shredding facility that has applied for or obtained a permit under this chapter, including without limitation the facilitys current permit status, a schedule for issuance of a draft permit and associated public meetings and opportunity for public comment periods, and a summary of the facilitys compliance history subsequent to the effective date.
(j)The department shall include in the fire response plan for a metal shredding facility any reasonable and necessary additional requirements or conditions that are recommended by the local fire department.
(k)The department, when considering the application for a metal shredding permit for a small metal shredding facility, shall take into consideration the size and nature of the facility when processing the permit application and assessing fees.
25095.11.Notwithstanding Section 25095.10, an owner or operator of a metal shredding facility that has submitted a permit application and is unable to comply with all the requirements of this chapter as of the effective date may continue to operate pending the departments final permit decision, subject to all of the following requirements specified in this section. Failure to meet the requirements of this section shall be subject to enforcement under Article 8 (commencing with Section 25095.60).
(a)(1)The owner or operator identifies in its application each provision of this chapter that the facility is unable to immediately comply with, including without limitation provisions applicable to management of metal shredder aggregate, light fibrous material, and metal shredder residue, and has developed and implemented a plan and schedule approved by the department for achieving compliance with the provisions of this chapter.
(2)Plans shall be submitted along with the permit application required in subdivision (b) of Section 25095.10.
(b)On or before the effective date, the owner or operator complies with the requirements set forth in subdivision (b) of Section 25095.13. A copy of the fire response plan shall be submitted to the department within seven days of the effective date and shall be subject to review and approval of the department after consultation with the facility and the local fire department of the jurisdiction where the facility is located.
(c)On or before the effective date, the owner or operator complies with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13.
(d)The owner or operator initiates, diligently pursues, and implements financial assurance for closure and third-party liability as required pursuant to Section 25095.41, including, but not limited to, both of the following:
(1)The owner or operator submits to the department a cost estimate and closure plan as part of the permit application.
(2)Within 30 days after the permit application is submitted, the owner or operator submits to the department a financial assurance mechanism that is equivalent to the requirements set forth in Sections 66264.143 and 66264.147 of Title 22 of the California Code of Regulations, except that a small metal shredding facility may submit the financial assurance mechanism within 90 days after the permit application is submitted.
(e)The owner or operator initiates and diligently pursues to completion a preliminary endangerment assessment, as required pursuant to Section 25095.30, or otherwise meets the requirements in Section 25095.30 and initiates any required actions identified in the preliminary endangerment assessment.
(f)The owner or operator complies with the standards set forth in Chapter 12 (commencing with Section 66262.10) of Division 4.5 of Title 22 of the California Code of Regulations with respect to all hazardous wastes generated at the facility.
(g)The owner or operator, at a minimum, maintains all existing practices and controls that are in effect or otherwise required by the department, a unified program agency, or a local environmental health department on or before the effective date, that are designed to prevent the possibility of any unplanned sudden or nonsudden release of any of the following into air, soil, or water that could threaten human health or the environment:
(1)In-process materials or components thereof, including metal shredder aggregate and light fibrous material.
(2)Hazardous waste or hazardous waste constituents.
(3)Metal shredder residue.
(4)Chemically treated metal shredder residue.
(h)The owner or operator complies with the following standards:
(1)Containment areas shall be in good condition; if there is a leak, contents shall be immediately transferred.
(2)Accumulation areas shall be inspected at least weekly.
(3)Containment areas shall be visibly labeled with contents and start date of accumulation. If labeling is infeasible, a record of the start dates of accumulation shall be maintained and made available to the public upon request.
(4)Incompatible materials shall not be kept together.
(5)All emergency equipment shall be regularly tested or maintained according to manufacturer standards.
(6)Employees shall have unimpeded access to emergency materials.
(7)There shall be at least one person on premises or on call at all times.
(8)Personnel training shall be required for emergency procedures for all possible emergencies and prevention requirements and shall include job specific and general awareness training.
(i)The owner or operator shall be subject to any interim measures or controls established by the department during consideration of the permit application that are necessary for the protection of human health and the environment. The department shall provide the owner or operator of the metal shredding facility with written findings explaining the basis for those interim requirements and a reasonable schedule for compliance with those measures.
25095.12.The owner or operator of a metal shredding facility shall operate the metal shredding facility in accordance with all of the following requirements:
(a)(1)The metal shredding facility shall be maintained and operated to minimize the possibility of a fire, explosion, or any unplanned sudden or nonsudden release of in-process materials or components thereof, including metal shredder aggregate and light fibrous material, into air, soil, or water that could threaten human health or the environment by implementing all reasonable and feasible operational or engineering methods of control, including, but not limited to, technologies or equipment taking into consideration the size, configuration, and location of the facility, the characteristics of the materials handled, and other relevant factors.
(2)The owner or operator shall take precautions to prevent accidental ignition or reaction of material that exhibits the characteristics of ignitability or reactivity. While ignitable or reactive material is being handled, the owner or operator shall confine smoking and open flame to specially designated locations. No Smoking signs shall be conspicuously placed wherever there is a hazard from ignitable or reactive material.
(3)The transfer, treatment, storage, or disposal of ignitable or reactive material shall be conducted so that it does not do any of the following:
(A)Generate extreme heat or pressure, fire or explosion, or violent reaction.
(B)Produce uncontrolled toxic mists, fumes, dusts, or gases in sufficient quantities to threaten human health or the environment.
(C)Produce uncontrolled flammable fumes or gases in sufficient quantities to pose a risk of fire or explosions.
(D)Damage the structural integrity of the device or facility containing the material.
(E)Any other activity similar to those listed in subparagraphs (A) to (D), inclusive, that threatens human health or the environment.
(b)(1)The owner or operator of the metal shredding facility shall develop and follow an inbound source control policy designed to prevent the shredding of any of the following materials or wastes at the facility:
(A)RCRA hazardous waste, as defined in Section 66261.100 of Title 22 of the California Code of Regulations, and non-RCRA hazardous waste, as defined in Section 66261.101 of Title 22 of the California Code of Regulations.
(B)Asbestos and asbestos-containing materials, except incidental asbestos-containing material that may be contained inside equipment and is not visible upon inspection.
(C)Radioactive materials.
(D)Petroleum-based wastes, including, but not limited to, used oil as defined in Section 25250.1, gasoline, and diesel, but not including non-free-flowing residual quantities of such wastes contained in depolluted vehicles or appliances.
(E)Polychlorinated biphenyls (PCB) materials and wastes, including, but not limited to, capacitors, electrical transformers, and transformer components.
(F)Fluorescent light ballasts, fluorescent lamps, neon, and high-intensity or mercury vapor lights.
(G)Military ordnance, except ordnance designated specifically as Material Designated as Safe (MDAS).
(H)Explosives, explosive residues, fireworks, and other incendiary materials.
(I)Regulated electronic waste.
(J)Mercury containing devices.
(K)Batteries, including, but not limited to, lead-acid batteries and lithium-ion batteries.
(L)Compressed gas cylinders and propane canisters, unless empty and disabled.
(M)Materials requiring special handling, as defined in Section 42167 of the Public Resources Code.
(2)The inbound source control policy shall contain all of the following:
(A)A written description of the load checking protocol designed to prevent materials or wastes identified in paragraph (1) from being shredded at the facility. Incoming feedstock subject to load checking shall not be shredded until the load-checking process has been completed.
(B)A written description of the process for rejecting loads, specific materials, or wastes that contain the materials or wastes identified in paragraph (1).
(C)A plan and template documents used to demonstrate that load checks are conducted and that materials or wastes identified in paragraph (1) are not accepted.
(D)A requirement to maintain all documentation related to the inbound source control policy and load checking the facility for at least five years and provide the documentation to the department upon request.
(E)A written description of a process to make a waste determination pursuant to Section 66262.11 of Title 22 of the California Code of Regulations for any of the materials or wastes listed in paragraph (1) that are identified after completion of the load check process and that were unknowingly accepted by the facility. Any waste determined to be a hazardous waste shall be considered generated at the metal shredding facility and shall be managed as a hazardous waste in accordance with Chapter 6.5 (commencing with Section 25100) and its implementing regulations.
(c)The owner or operator of the metal shredding facility shall develop and implement procedures for any depollution operations that are conducted at the metal shredding facility involving the removal of automotive fuels, lubricating oils, refrigerants, and materials that require special handling, as defined in Section 42167 of the Public Resources Code, including procedures for the proper management of those materials or wastes that are removed during depollution operations, pursuant to Section 25212.
(d)(1)The owner or operator of the metal shredding facility shall maintain all of the following documents at the metal shredding facility:
(A)A written inspection schedule meeting the substantive requirements of subdivision (b) of Section 66265.15 of Title 22 of the California Code of Regulations.
(B)A written description of training documents, including a syllabus or outline, of the type and amount of both introductory and continuing training that has been given to each person at the metal shredding facility.
(C)A contingency plan that contains the information specified in Section 66265.52 of Title 22 of the California Code of Regulations.
(D)A copy of any local air quality management district or air pollution control district permit and other governmental permits or approvals required for operation of the metal shredding facility equipment.
(E)The closure plan required under Section 25095.40.
(F)A copy of documents related to any environmental investigation and any cleanup or other remediation measures implemented at the facility within the last five years.
(G)The housekeeping plan prepared pursuant to Section 25095.13.
(H)Records of offsite transportation of metal shredder aggregate and CTMSR.
(2)The owner or operator shall make the documents described in paragraph (1) available at the metal shredding facility to the department, the United States Environmental Protection Agency, or a local governmental agency upon request.
(e)The owner or operator of a metal shredding facility shall comply with all of the following:
(1)Subdivision (b) of Section 66265.142 of Title 22 of the California Code of Regulations.
(2)The contingency plan as required in subparagraph (C) of paragraph (1) of subdivision (d).
(3)As applicable, Article 3 (commencing with Section 66265.30) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(4)Article 16 (commencing with Section 66265.370) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(f)The owner or operator of a metal shredding facility shall provide notice to the department of an imminent or actual emergency situation, as required by Section 66265.56 of Title 22 of the California Code of Regulations.
(g)The owner or operator of a metal shredding facility shall provide written notice to the department at least 60 days before transferring ownership or operation of the facility.
(h)The owner or operator shall prevent the unknowing entry, and prevent unauthorized entry, of persons or livestock onto the active portion of the facility.
(i)For any new construction at a facility located in a 100-year floodplain or within the maximum high tide, the facility shall take all reasonable and feasible precautions to prevent washout of any hazardous materials.
(j)For any new construction at a facility, the facility shall take all reasonable and feasible precautions to withstand the maximum credible earthquake.
25095.13.The owner or operator of a metal shredding facility shall develop and comply with plans and minimum standards relating to each of the following aspects of the metal processing operation:
(a)The control of releases, including, but not limited to:
(1)Plans for complying with applicable local air quality management district or air pollution control district regulations and permit requirements, including the requirements of any approved emissions minimization plan or comparable plan required by applicable regulations.
(2)A housekeeping plan that is approved by the department and that does all of the following:
(A)Details all measures to control dispersal of metal shredder aggregate and its constituents, including light fibrous material, and metal shredder residue and constituents. Those measures shall include, but are not limited to, mechanical and manual sweeping, washing or cleaning of equipment and structures to remove accumulated debris, application of water using water trucks, sprinklers, spray bars, deluge systems or other dust suppression equipment, fencing, and enclosures.
(B)Specifies the frequency for each measure detailed pursuant to subparagraph (A).
(C)Addresses the disposition of residuals generated from cleaning, including, but not limited to, debris, sweepings, rinse water, and any other material that does not contain recoverable ferrous or nonferrous metal.
(D)Requires the completion of written logs of all housekeeping activities. The written logs shall be maintained in accordance with Section 25095.12.
(E)Requires the management of any light fibrous material that has been released from the facility to be subject to regulation under Chapter 6.5 (commencing with Section 25100).
(3)A metal shredding facility inspection plan that is approved by the department. The metal shredding facility inspection plan shall include all of the following:
(A)Inspection of all facilities and equipment that is used to manage metal shredder aggregate.
(B)A copy of a general inspection schedule that complies, with the specific requirements in Sections 66264.174, 66264.195, 66264.254, 66265.403, and 66264.1101 of Title 22 of the California Code of Regulations, and, as applicable, complies with the specific requirements in subdivision (i) of Section 66264.193, and Sections 66264.195, 66264.226, 66264.273, 66264.303, 66264.602, 66264.1033, 66264.1052, 66264.1053, 66264.1058, 66264.1084, 66264.1085, 66264.1086, 66265.1088, and 66264.1101 of Title 22 of the California Code of Regulations.
(C)All areas where the deposition of metal shredder aggregate, including light fibrous material and metal shredder residue may occur, including accessible areas within 500 feet of the metal shredding facilitys property boundary or further as determined by the department.
(4)An inventory management plan, that is approved by the department, to prevent accumulation of shredder feedstock and metal shredder aggregate and treated or untreated metal shredder residue in excess of the limitations set forth in subparagraph (E) of paragraph (2) of subdivision (b).
(5)Standards for the installation and maintenance of paving with concrete, steel plate, or other surfacing materials approved by the department that are designed to prevent infiltration and to collect and route water to a water management system. The paving shall be inspected quarterly and repaired as needed. The results of the paving inspections and any paving repairs shall be submitted to the department with the annual report and as requested by the department.
(b)(1)A separate written plan for the prevention, detection, and suppression of fires. The plan shall comply with all of the following:
(A)Be shared with local emergency responders.
(B)Be used to monitor metal shredding facility operations for evidence of incipient fire.
(C)Establish procedures for responding to fires of different duration and severity.
(D)Be activated in response to any incident at the metal shredding facility that falls within the scope of the plan.
(2)The plan shall include all of the following:
(A)Procedures for response to incipient fires and access to adequate water, water pressure, firefighting foam, and other supplies at the metal shredding facility that can be used in responding to an incipient or larger fire.
(B)Training of metal shredding facility personnel in the proper use of fire-response equipment and procedures and notification requirements.
(C)Coordination with local fire departments, the unified program agency, if other than the fire department, and other first responders as necessary to support maximum effectiveness in responding to an emergency at the metal shredding facility.
(D)Monitoring of temperatures on all feedstock and metal shredder aggregate piles, using an infrared camera or other equivalent equipment that continuously monitors the temperature of feedstock and aggregate piles and provides an alarm or other indication of temperature increases outside normal range.
(E)Inventory management provisions necessary to prevent the accumulation of feedstock or metal shredder aggregate at the facility in quantities that exceed the reasonable holding capacity of the facility and that cannot be processed within normal operating cycles, including typical periods of breakdown, maintenance, and repair. The following limits shall apply:
(i)No individual stockpile of feedstock shall exceed the amount of material that can be processed within a 24-hour period.
(ii)No individual pile of metal shredder aggregate shall exceed the amount of material that can be processed within a 48-hour period.
(iii)No individual pile of feedstock or metal shredder aggregate shall remain inactive for more than 48 hours except during periods when the facility is closed or not operating. Periods of breakdown, maintenance and repair, or under other circumstances specified in the facilitys approved inventory management plan, shall not be included in calculating the 48-hour period. A pile shall not be considered inactive if the majority of the material in the pile is removed over a period of 48 hours. In the event of an incident that is required to be reported to the department under Section 25095.31, the department may reduce the number of hours that a pile of feedstock or metal shredder aggregate may remain inactive until the owner or operator demonstrates to the satisfaction of the department and the local fire department that the risk of fire has been mitigated.
(iv)During any period of breakdown and associated repair that exceeds 72 hours, the feedstock and metal shredder aggregate piles shall be subject to additional controls as specified in the facilitys approved inventory management plan. Any shredder feedstock accepted by the facility during a period of breakdown, maintenance, or repair exceeding 72 hours shall be managed in accordance with the facilitys approved inventory management plan.
(v)All feedstock and metal shredder aggregate piles shall be subject to continuous 24-hour onsite surveillance, including when the facility is not operating, and such other additional controls specified in the facilitys approved fire response plan. All electronic surveillance data shall be maintained for a period of at least 14 days following any incident that is required to be reported to the department under Section 25095.31.
(F)Provisions for capture and management of fire suppression water as necessary to prevent discharge into storm drains or runoff into surface water.
(G)Requirement for at least one person to be present at the facility or on call at all times.
(3)The department, in coordination with the local fire department of the jurisdiction where the metal shredding facility is located, shall review a facilitys fire response plan on an annual basis and require the owner or operator to update the plan if necessary based on changes in technology or fire prevention practices, or the facilitys compliance history and history of fire, explosion, or release of hazardous waste or hazardous waste constituents.
(c)Stormwater management and control, including, but not limited to:
(1)Containment of stormwater in retention ponds, sumps, tanks, and associated piping or other engineered retention units to minimize free-standing water at the metal shredding facility.
(2)A stormwater testing plan to identify if stormwater exhibits any characteristics of toxicity as described in Section 66261.24 of Title 22 of the California Code of Regulations.
(3)Compliance with the metal shredding facilitys stormwater pollution prevention plan and spill prevention, control, and countermeasures plan.
(4)Discharge of stormwater in accordance with the general permit for discharges of stormwater associated with industrial activities or waste discharge requirements issued by a regional water quality control board, including sampling requirements.
25095.14.(a)Subject to subdivision (b), the owner or operator of a metal shredding facility may make the following physical or operational changes to the metal shredding facility without seeking prior approval from the department:
(1)Throughput increases and increases in maximum operating rate that are authorized or approved by an air quality management district or air pollution control district.
(2)Increases in efficiency of metal processing operations, including, without limitation, sizing, separation, sorting, removal, and recovery.
(3)Changes in design of processing equipment and conveyance systems.
(4)Changes in operations and methods of operation.
(5)Installation and modification of processing and other equipment and conveyance systems.
(6)Repair and replacement of processing and other equipment and conveyance systems.
(7)Decommissioning and removal of equipment and conveyance systems that are no longer in use.
(8)Construction of new structures and enclosures and changes to structures and enclosures.
(9)Installation and modification of abatement equipment and emission control systems.
(10)Installation of and modifications to water reuse and recycling systems.
(11)Installation of and repair to paving.
(12)Any other changes to the metal shredding facility unrelated to the storage or processing of metal shredder aggregate and metal shredder residue.
(b)Except as provided in subdivision (d), the changes described in subdivision (a) may be made without seeking prior approval from the department if the metal shredding facility maintains substantial compliance with this chapter and the owner or operator provides the department with written notice of these changes within 30 days of making the changes. The department shall post the notice on the section of its internet website that provides information regarding metal shredding facilities.
(c)The department shall evaluate the information provided in the notice from the facility pursuant to this subdivision, as well as any objections from the public, to assess whether the modification could result in a potentially significant impact on the environment. If the department determines that the modification could have a potentially significant impact on the environment, the owner or operator of the facility shall be required to implement changes to the modification as necessary to mitigate the impact to the extent feasible.
(d)The owner or operator of a metal shredding facility that proposes to modify the metal shredding facility in a manner that could result in a significant environmental impact from operations that were not considered by the department in reviewing the information submitted pursuant to this article shall provide the department with 60 days advance written notice of the modification and shall not implement the modification without approval from the department. The department shall provide notice of the proposed modification to the public and shall comply with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) in its review of the project.
(e)(1)On or before July 1 of each year, the owner or operator of a metal shredding facility shall submit an annual report to the department describing the material physical or operational changes, if any, made to the metal shredding facility during the previous calendar year relating to the management of metal shredder aggregate or metal shredder residue.
(2)Upon request by the department, the metal shredding facility shall be required to provide additional information about the nature or extent of changes described in the notice provided pursuant to subdivision (b) or the annual report as necessary to demonstrate the metal shredding facilitys ongoing compliance with applicable regulations.
(3)Physical changes to the metal shredding facilitys ongoing operations that are reported to the department in compliance with paragraph (1) may be reviewed and modified by the department as necessary to ensure compliance with the requirements of this chapter.
25095.15.(a)The owner or operator of a metal shredding facility shall manage all metal shredder aggregate during metal processing operations as necessary to achieve the following minimum standards:
(1)All outdoor equipment used for processing metal shredder aggregate shall be enclosed or covered and designed, operated, and maintained to minimize the possibility of the release of light fibrous material into the environment.
(2)All outdoor equipment used for the conveyance of metal shredder aggregate from one location within the metal shredding facility to another location within the metal shredding facility shall be enclosed or covered and designed, operated, and maintained to minimize the possibility of the release of light fibrous material into the environment.
(3)All vehicles used for the outdoor transfer of metal shredder aggregate shall be loaded and unloaded in a manner that minimizes the possibility of the release of metal shredder aggregate, including light fibrous material into the environment.
(b)Metal shredder aggregate shall be stored or accumulated inside a structure that protects the material from exposure to the elements and minimizes the possibility of the release of light fibrous material into the environment. At a minimum, the structure shall meet all of the following requirements:
(1)The structure shall be enclosed with a floor, roof, and walls sufficient to protect the metal shredder aggregate from exposure to the elements and to contain the metal shredder aggregate and any process residues that are managed in the structure.
(2)The roof shall completely cover all areas used for storage or accumulation of metal shredder aggregate.
(3)The floor shall be constructed of concrete surfacing, steel plate, or other surfacing material approved by the department designed to prevent infiltration and collect and route any water that drains from the metal shredder aggregate to a process water management system. The floor shall be inspected on a quarterly basis and repaired as needed. The results of the inspections and any repairs to the floor shall be included in the annual report submitted to the department pursuant to Section 25095.14.
(4)Any liquids that drain from materials stored inside the enclosure shall be collected and routed to the metal shredding facilitys recycled water management system.
(c)Trommel or augers shall be located in a building or otherwise covered or enclosed so as to minimize the possibility of releases.
(d)Subject to written approval by the department, stockpiling of metal shredder aggregate outside the confines of an enclosure required by subdivision (b) may be allowed for limited periods of time if all of the following conditions are met:
(1)The activity is necessary to accommodate unforeseen circumstances or operational disruptions that prevent the material from being stored inside an enclosure. These unforeseen circumstances or operational disruptions shall have been outside the reasonable control of the facility. The facility shall use best efforts to remedy any unforeseen circumstances or operational disruptions that necessitate outdoor stockpiling of metal shredder aggregate.
(2)The operator provides written notice to the department, the unified program agency, and the local fire department at least 24 hours before the need to store material outside arises.
(3)The operator conducts watering or other dust control measures to minimize the possibility of the release of light fibrous material from the stockpile into the environment.
(4)The outdoor stockpiling activity is conducted for 10 or fewer consecutive operating days.
(5)The outdoor stockpiling activity does not begin until approval is provided by the department. The department may rescind the temporary approval for outdoor stockpiling if the facility is not using best efforts to remedy any unforeseen circumstances or operational disruptions that necessitate outdoor stockpiling.
(e)The requirements of this section shall also apply to the management of untreated and treated metal shredder residue.
25095.16.(a)Metal shredder aggregate that is transported to an offsite metal shredding facility or metal recycling facility for purposes of processing shall be tarped or otherwise contained during shipment and transported in a manner that minimizes the possibility of release into the environment.
(b)The metal shredder aggregate shall be shipped directly to the offsite metal processing facility and shall not be handled at any interim location or held at any publicly accessible interim location for more than four hours unless required by hours of service or other applicable law or held by a rail transporter for reasons outside the control of the person arranging for transport.
(c)Each shipment of metal shredder aggregate by truck or rail shall be identified by a standard bill of lading or other shipping document that complies with applicable United States Department of Transportation requirements and that contains all of the following:
(1)The quantity, by weight, of metal shredder aggregate being transported.
(2)The name, physical and mailing addresses, and telephone number of the metal shredding facility that produced the metal shredder aggregate.
(3)The name, physical and mailing addresses, and telephone number of the metal processing facility that will process the metal shredder aggregate.
(4)The date the shipment of metal shredder aggregate leaves the originating metal shredding facility.
(5)The date the shipment of metal shredder aggregate is scheduled to arrive at the receiving metal processing facility.
(6)The name of the transporter that shipped the metal shredder aggregate from the originating metal shredding facility to the receiving metal processing facility.
(d)The originating metal shredding facility shall retain a copy of all shipping documents onsite, in either paper or electronic form, for a period of at least three years. The three-year record retention period may be extended at the direction of the department during the course of any unresolved enforcement action regarding the shipments.
(e)Transporters shall obtain and maintain liability insurance in accordance with Section 34631.5 of the Vehicle Code. A transporter shall cease to transport metal shredder aggregate upon loss of liability coverage.
(f)The owner or operator of the originating facility shall include in the annual report submitted to the department under Section 25095.14 the total tonnage of metal shredder aggregate that was shipped to another recycling facility for processing during the calendar year, the name of each transporter used for this purpose, the bill of lading numbers, and the total tonnage transported by that transporter during the calendar year, and the name and location of the facilities that processed the material. The department shall handle the information in a manner consistent with exceptions or exemptions under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
4.Classification of Materials25095.20.(a)If managed in accordance with this chapter, including any plans approved by the department and any additional conditions imposed by the department pursuant to Section 25095.10 or 25095.11, the following materials are not waste, as defined in Section 25124, and shall not be subject to regulation under Chapter 6.5 (commencing with Section 25100) of this division or Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations:
(1)Scrap metal.
(2)Metal shredder aggregate that is managed in either of the following ways:
(A)The metal shredder aggregate is stored and processed at the same metal shredding facility that produced the metal shredder aggregate.
(B)The metal shredder aggregate is transferred to another metal shredding facility or metal recycling facility within federal Standard Industrial Classification Code 5093 for the purpose of processing or further processing the metal shredder aggregate to separate and remove ferrous or nonferrous metals, subject to all of the following:
(i)Either one of the following:
(I)The receiving facility is located in the State of California and operates in accordance with the requirements of this chapter.
(II)The receiving facility is located in a state other than the State of California and is operated in accordance with the law of the state where the receiving facility is located.
(ii)Before transportation offsite, the metal shredder aggregate is managed in accordance with the requirements of the plan approved by the department under subparagraph (L) of paragraph (2) of subdivision (b) of Section 25095.10.
(iii)The receiving facility keeps records of the amount of ferrous and nonferrous metal recovered from the metal shredder aggregate and makes this information available to the department upon request.
(iv)The metal shredder aggregate is transported in accordance with the requirements of Section 25095.16.
(3)Intermediate metal products that are subject to further processing to improve product quality.
(4)Finished ferrous and nonferrous metal commodities that are separated or removed from metal shredder aggregate at a metal shredding facility.
(5)Nonmetallic recyclable items recovered from metal shredder aggregate for which a market exists.
(b)Notwithstanding subdivision (a) and any other provision of this chapter, metal shredder aggregate, including light fibrous material, that is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, shall be subject to regulation as hazardous waste under Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations, if it exhibits a characteristic of hazardous waste specified in those regulations.
25095.21.(a)Untreated metal shredder residue that meets the definition of a non-RCRA hazardous waste as defined in Section 66261.101 of Title 22 of the California Code of Regulations shall be chemically treated in accordance with this section or managed in accordance with all applicable requirements of Chapter 6.5 (commencing with Section 25100) and implementing regulations. Chemically treated metal shredder residue is not hazardous waste if all of the following conditions are met:
(1)Unless an alternative treatment recipe is approved by the department, untreated metal shredder residue shall be treated with at least 0.7 gallons of silicate solution per short ton of the untreated metal shredder residue and cement by weight equal to 8.5 percent of the weight of the untreated metal shredder residue.
(2)Metal shredding facilities shall document, on a weekly basis, how many tons of metal shredder residue was treated and how much silicate solution and cement were used in the treatment of the untreated metal shredder residue to comply with paragraph (1).
(3)The chemically treated metal shredder residue does not meet the definition of RCRA hazardous waste, as defined in Section 66261.100 of Title 22 of the California Code of Regulations.
(4)Immediately after waste stabilization, and at all times before offsite transportation and disposal, chemically treated metal shredder residue shall be managed in a manner that prevents releases of chemically treated metal shredder residue outside of a designated accumulation area. The designated accumulation area shall meet the requirements of either of the following:
(A)A self-supporting structure that meets all of the following requirements:
(i)The structure shall be fully or partially enclosed with a floor, at least three walls, and a roof to prevent exposure of the chemically treated metal shredder residue to the elements, including surface transport by precipitation runoff, contamination of soil and groundwater, and wind dispersal outside the enclosure.
(ii)The structure shall be constructed of man-made materials of sufficient strength and thickness to support themselves, the waste contents, any personnel and heavy equipment that operate within the unit, and the stresses of daily operation, such as the movement of personnel, wastes, and handling of equipment within the structure.
(iii)The designated accumulation area shall be labeled or marked clearly with the words Chemically Treated Metal Shredder Residue or CTMSR. The metal shredding facility shall comply with accumulation time limits as required in Section 66262.17 of Title 22 of the California Code of Regulations.
(B)A containment building that meets the requirements of either of the following:
(i)Article 29 (commencing with Section 66264.1100) of Chapter 14 of Title 22 of the California Code of Regulations.
(ii)Article 29 (commencing with Section 66265.1100) of Chapter 15 of Title 22 of the California Code of Regulations.
(b)Chemically treated metal shredder residue shall not be transported to, and shall not be disposed of at, any location other than one of the following:
(1)A composite-lined portion of a solid waste landfill unit that meets all requirements applicable to disposal of municipal solid waste in California after October 9, 1993, based on State Water Resources Control Board Resolution No. 93-62.
(2)A solid waste landfill or other facility that is regulated by waste discharge requirements issued pursuant to Division 7 (commencing with Section 13000) of the Water Code for discharges of designated waste, as defined in Section 13173 of the Water Code, or that allows for the discharge of chemically treated metal shredder residue. The discharge of chemically treated metal shredder residue includes its use as an alternative daily cover or for other beneficial reuse pursuant to Section 41781.3 of the Public Resources Code and the regulations adopted to implement that section.
(3)Any other landfill or location that is authorized by law to receive chemically treated metal shredder residue for disposal or beneficial use.
(c)The transporter of chemically treated metal shredder residue shall comply with all of the following conditions:
(1)Chemically treated metal shredder residue shall be contained and covered during shipment and transported in a manner that prevents any release into the environment.
(2)The transporter shall comply with all applicable United States Department of Transportation shipping requirements.
(3)The vehicle of railcar used to transport chemically treated metal shredder residue shall lack evidence of leakage, spillage, or damage that could cause releases under reasonably foreseeable conditions.
(4)The transporter of chemically treated metal shredder residue shall not transport chemically treated metal shredder residue to a place other than a landfill approved to receive chemically treated metal shredder residue, as described in subdivision (b).
(5)The chemically treated metal shredder residue is not held at any publicly accessible interim location for more than four hours, unless required by other provisions of law, before disposal.
(6)If an unauthorized release of chemically treated metal shredder residue occurs during transportation, the transporter shall immediately contain all releases of chemically treated metal shredder residue and residues from chemically treated metal shredder residue into the environment and determine whether any material resulting from that release is a hazardous waste and, if so, shall manage the hazardous waste in compliance with all applicable requirements of this division. The transporter of chemically treated metal shredder residue is considered the generator of any hazardous waste resulting from the release and is subject to the requirements of Chapter 12 (commencing with Section 66262.10) of Division 4.5 of Title 22 of the California Code of Regulations.
(d)Each shipment of chemically treated metal shredder residue shall be accompanied by a shipping document containing all of the following information:
(1)The quantity, by weight in short tons, of chemically treated metal shredder residue being transported.
(2)The name, physical and mailing addresses, and telephone number of the generating metal shredding facility.
(3)The name, physical and mailing addresses, and telephone number of the destination landfill.
(4)The date the shipment of chemically treated metal shredder residue leaves the metal shredding facility.
(5)The date the shipment of chemically treated metal shredder residue arrives at the destination landfill.
(6)The name and telephone number of the transporter who shipped the chemically treated metal shredder residue from the metal shredding facility to the destination landfill.
(e)The metal shredding facility shall retain onsite a copy of all documentation produced pursuant to this section for at least three years from the date that the chemically treated metal shredder residue that is the subject of the documentation was generated. The department may request the information identified in subdivision (d) in the form of a summary log or a copy of each individual shipping document. The three-year record retention period is automatically extended during the course of any unresolved enforcement action regarding chemically treated metal shredder residue management activity or as requested by the department.
(f)The generating metal shredding facility shall, on or before February 1 of the following year, submit to the department, at the address specified in subdivision (g) of this section, a written annual report containing all of the following information:
(1)The name, physical and mailing addresses, and telephone number of the generating metal shredding facility.
(2)The name, telephone number, and email address of the contact person at the generating metal shredding facility who should be contacted regarding management, transportation, and disposal of chemically treated metal shredder residue.
(3)The name, physical and mailing address, and telephone number for each of the landfills to which the generating metal shredding facility shipped chemically treated metal shredder residue during the previous calendar year.
(4)The total cumulative quantity of chemically treated metal shredder residue, by weight in short tons, shipped to all landfills, and the respective quantity of chemically treated metal shredder residue, by weight in short tons, shipped to each landfill, during the previous calendar year.
(5)The United States Environmental Protection Agency identification number of the generating metal shredding facility.
(g)The metal shredding facility shall provide a copy of any relevant document identified in subdivision (e) upon receipt of a request from the department. Annual reports submitted to the department pursuant to subdivision (f) shall be sent to the following address: Department of Toxic Substances Control, CTMSR Reporting Staff, P.O. Box 806, Sacramento, CA 95812-0806, with the words Attention: CTMSR Annual Report prominently displayed on the front of the envelope.
(h)The owner or operator of a metal shredding facility shall not be required to treat metal shredder residue and shall be exempt from this section if the owner or operator determines, as prescribed in Section 66262.11 of Title 22 of the California Code of Regulations, that the metal shredder residue generated at the facility does not exhibit any state or federal characteristics of hazardous waste, as prescribed in Chapter 11 (commencing with Section 66261.1) of Division 4.5 of Title 22 of the California Code of Regulations.
5.Reporting25095.30.(a)Except as otherwise provided in subdivision (c), within one year after the effective date, the owner or operator of a metal shredding facility shall conduct a preliminary endangerment assessment, as defined in Section 78095, and submit it to the department. The preliminary endangerment assessment shall be conducted in accordance with the most current department guidance manual for evaluating hazardous substance release sites and shall include an evaluation of process areas or locations where releases of materials containing hazardous constituents may have or have occurred, a conceptual site model, and site-specific human health and ecological screening evaluations.
(b)The owner or operator of a metal shredding facility shall conduct appropriate corrective action as needed to address releases of hazardous materials or wastes that pose a significant threat to human health or the environment. This subdivision does not prohibit the department from issuing a corrective action order under Section 25187 subsequent to any investigation of the metal shredding facility.
(c)The owner or operator of a metal shredding facility may demonstrate compliance with this section by providing evidence to the department that, within the last five years, the metal shredding facility has completed an assessment of the metal shredding facility pursuant to an order issued by the department, a regional water quality control board, or any other federal, state, or local agency and is implementing, or has implemented, any corrective action requirements imposed by the agency.
25095.31.(a)The owner or operator of a metal shredding facility shall provide the department with immediate notice of a fire or other incident at the metal shredding facility that requires the assistance of a local fire department or other first responder. This notice shall be in addition to any notice that is required to be made to the Office of Emergency Services pursuant to Section 66265.56 of Title 22 of the California Code of Regulations, the unified program agency, and any other agency under applicable law.
(b)The owner or operator of a metal shredding facility shall establish an effective means of providing public notice to members of the surrounding community upon the occurrence of a fire or other incident that poses a threat to human health or the environment outside of the facility as specified in Section 66265.56 of Title 22 of the California Code of Regulations.
(c)The department shall evaluate how to apply to metal shredding facilities its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations as described in subdivisions (b) and (c) of Section 25200.21.
25095.32.[RESERVED]25095.32.On, or before July 1, 2030, the Board of Environmental Safety, at a specially scheduled public meeting, shall hear from the department and receive input from members of the public, metal shredding facilities, and other interested stakeholders on the implementation of this chapter. A notice announcing the proposed date, time and location of the meeting shall be posted on the boards internet website at least 30 days before the meeting and may be changed by the board if an alternate meeting date or location is determined to be appropriate, which information shall be posted on the boards internet website at least 14 calendar days before the meeting. The board shall also allow remote participation in the meeting. Following the public meeting, the board shall provide the department with any recommendations regarding the implementation and administration of this chapter.
6.Closure25095.40.(a)The owner or operator of a metal shredding facility shall have a written closure plan.
(1)The written closure plan shall address all of the following:
(A)The closure and removal of all feedstock, metal shredder aggregate, and treated and untreated metal shredder residue.
(B)The decontamination of equipment and operating areas used for processing metal shredder aggregate.
(C)The treatment of metal shredder residue and management of chemically treated metal shredder residue.
(2)The written closure plan shall include all of the following:
(A)A description of how the equipment and areas used for processing metal shredder aggregate and for treating metal shredder residue will be closed. The description shall identify the maximum extent of the operation during the life of the equipment or area and how all of the following requirements will be met, if applicable:
(i)Section 66265.114 of Title 22 of the California Code of Regulations.
(ii)Subdivisions (a), (b), and paragraphs (1) and (2) of subdivision (c) of Section 66265.197 of Title 22 of the California Code of Regulations.
(iii)Section 66265.404 of Title 22 of the California Code of Regulations.
(B)An estimate of the maximum inventory of metal shredder aggregate and metal shredder residue in storage and in treatment at any time during the operation of the metal shredding facility.
(C)A description of the steps needed to remove or decontaminate an area, equipment, or structure during partial and final closure, including, but not limited to, procedures for cleaning equipment and removing contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required.
(D)An estimate of the expected year of closure and a schedule for final closure. The schedule for final closure shall include, at minimum, the total time required to close each authorized unit.
(3)The written closure plan shall be subject to approval by the department.
(4)An amendment to the written closure plan shall be done in compliance with subdivision (c) of Section 66265.112 of Title 22 of the California Code of Regulations.
(b)The metal shredder facility shall maintain compliance with both of the following requirements regarding closure:
(1)Subdivisions (a) and (b) of Section 66265.111 of Title 22 of the California Code of Regulations, in the same manner as those provisions apply to metal shredding facilities.
(2)Section 66265.114 of Title 22 of the California Code of Regulations.
(c)Within 90 days after processing the final volume of metal shredder aggregate, the owner or operator shall commence closure of the metal shredding facility in accordance with the written closure plan.
(d)The owner or operator shall complete closure activities in accordance with the written closure plan within 180 days after processing the final volume of metal shredder aggregate unless the owner or operator demonstrates to the department any of the following:
(1)The activities required to complete the closure will require longer than 180 days to complete.
(2)The facility has the capacity to process additional metal shredder aggregate.
(3)There is a reasonable likelihood that a person other than the owner or operator will recommence operation of a unit, the equipment or area, closure of the equipment and area would be incompatible with the operation of the metal shredding facility, and the owner or operator has taken and will continue to take all steps necessary to prevent threats to human health and the environment.
(e)The owner or operator shall notify the department and any other agencies having jurisdiction over the closure project at least 15 days before completion of closure.
(f)The owner or operator shall remain in compliance with all applicable requirements of this chapter until the owner or operator submits to the department or authorized agency a certification signed by the owner or operator and by an independent, professional engineer registered in California that closure has been completed in accordance with the written closure plan and that the written closure plan meets or exceeds the applicable requirements of this chapter.
25095.41.(a)The owner or operator shall provide a closure cost estimate to the department consistent with Section 66265.142 of Title 22 of the California Code of Regulations and based on all of the following factors:
(1)The cost of transporting any unprocessed metal shredder aggregate and metal shredder residue to another metal shredding facility for processing or disposal.
(2)The cost of decontaminating all areas and equipment used for storage and processing of metal shredder aggregate.
(3)The cost of decontaminating all areas and equipment used for treatment and storage of treated or untreated metal shredder residue.
(4)The cost for all closure sampling and analysis confirming decontamination sufficiently meets closure performance standards.
(5)The cost of disposition of the maximum amount of metal shredder aggregate and metal shredder residue that may be present at the metal shredding facility at the time of closure.
(6)The cost of closure certification.
(b)For the purpose of calculating the closure cost estimate, the owner or operator may apply the fair market value of any remaining feedstock and metal shredder aggregate against the estimated cost of closure. In addition, the owner or operator may take into consideration metal shredding facility structures, equipment, and other assets that may continue to be used, sold to third parties, or salvaged for scrap value. The closure cost estimate shall also be determined based on the site-specific aspects of the metal shredding facility, including, without limitation, those site-specific aspects specified in Section 25095.40.
(c)The owner or operator shall provide a financial assurance mechanism for closure of the metal shredding facility using one or more of the financial mechanisms described in Section 66265.143 of Title 22 of the California Code of Regulations.
(d)The owner or operator shall provide a financial assurance mechanism for bodily injury and property damage to third parties caused by sudden accidental occurrences arising from operations of the metal shredding facility. The owner or operator shall have and maintain liability coverage for sudden accidental occurrences in the amount of at least one million dollars ($1,000,000) per occurrence with an annual aggregate of at least two million dollars ($2,000,000), exclusive of legal defense costs. The owner or operator may satisfy the requirements of this subdivision through a financial mechanism identified in Section 66265.147 of Title 22 of the California Code of Regulations.
(e)If the facility is required to implement postclosure care following closure of the facility, the owner or operator shall provide a financial assurance mechanism for postclosure using one or more of the financial mechanisms described in Section 66265.145 of Title 22 of the California Code of Regulations.
7.Fees25095.50.(a)The following definitions shall apply for purposes of this article:
(1)Fee rate means the rate to be set by the department for the 202728 fiscal year, as annually adjusted by the Board of Environmental Safety beginning in the 202829 fiscal year and thereafter pursuant to subdivision (b).
(2)Fee schedule means the fee structure established in regulations by the department pursuant to subdivision (b) using the criteria in subdivision (c).
(b)(1)Beginning in the 202829 fiscal year, the rates established by the department shall be reviewed and shall be increased or decreased annually by the Board of Environmental Safety as necessary and shall provide for the assessment of no more than the reasonable and necessary costs of the department and the Office of Environmental Health Hazard Assessment to implement this chapter as described in this section.
(2)The department shall collect an annual fee on all metal shredding facilities that are subject to the requirements of this chapter. The department shall establish and adopt regulations to administer this fee and to establish a fee schedule and rate that is sufficient to cover the departments reasonable costs to implement this chapter and Sections 25150.87 and 41514.6, excluding the costs described in Section 25095.51.
(3)The fee rate shall include, but not be limited to, the costs of fee administration, the costs of collection of the fee, the departments administrative costs, and statewide general administrative costs related to implementation of this chapter and Sections 25150.87 and 41514.6.
(4)The fee rate shall allow for a reserve in the fund each year at an amount sufficient to ensure that all programs funded by the subaccount will not be adversely affected by revenue shortfalls or baseline expenditure adjustments and does not exceed 10 percent of the authorized expenditure levels.
(5)The fees established pursuant to this section shall also be sufficient to cover the Office of Environmental Health Hazard Assessments reasonable costs to implement Sections 25150.87 and 41514.6.
(c)In establishing a fee schedule that may be imposed on a metal shredding facility pursuant to this section, the department shall consider all of the following factors as they relate to the departments reasonable oversight costs:
(1)The facility-specific permit conditions, if any, developed pursuant to paragraph (5) of subdivision (b) of Section 25095.10.
(2)The size of the facility.
(3)The volume of feedstock that is shredded on an annual basis.
(4)The types of feedstock that are shredded at the facility.
(5)The nature of metal processing operations occurring at the facility.
(6)Whether the facility conducts chemical stabilization of metal shredder residue.
(d)The Controller shall establish a new and separate Metal Shredding Facility Subaccount in the Hazardous Waste Control Account. The Metal Shredding Facility Subaccount shall be administered by the Director of Toxic Substances Control. The fees collected pursuant to this section shall be deposited into the Metal Shredding Facility Subaccount and be available for expenditure by the department and the Office of Environmental Health Hazard Assessment, upon appropriation by the Legislature, solely for the purpose of implementation and administration of this chapter and Sections 25150.87 and 41514.6. The Director of Finance, upon request of the Director of Toxic Substances Control, may make a loan from the General Fund to the Metal Shredding Facility Subaccount to meet cash needs. The loan shall be subject to the repayment provisions of Section 16351 of the Government Code and the interest provisions of Section 16314 of the Government Code.
(e)(1)A regulation adopted pursuant to this section may be adopted as an emergency regulation in accordance with Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, and, for purposes of that chapter, including Section 11349.6 of the Government Code, the adoption of these regulations is an emergency and shall be considered by the Office of Administrative Law as necessary for the immediate preservation of the public peace, health, safety, and general welfare. Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, an emergency regulation adopted by the department or the Board of Environmental Safety pursuant to this section shall be filed with, but not be repealed by, the Office of Administrative Law and shall remain in effect for a period of two years or until revised by the department or the Board of Environmental Safety, whichever occurs sooner.
(2)Before adopting a regulation pursuant to this section, the department shall hold at least two public hearings regarding the proposed regulation, including one public hearing dedicated to assessing the impact of the proposed regulation on small metal shredding facilities as defined in this chapter.
(f)(1)A metal shredding facility paying an annual fee in accordance with this section is not subject to any of the following fees set forth in Chapter 6.5 (commencing with Section 25100), with respect to the production, transportation, and processing of metal shredder aggregate, the generation, handling, and management, transportation, and disposal of nonhazardous metal shredder residue:
(A)A fee imposed pursuant to Section 25205.7.
(B)A facility fee imposed pursuant to Section 25205.2.
(C)A fee imposed pursuant to Section 25205.5.
(2)A metal shredding facility is subject to the fees listed in paragraph (1) for any hazardous waste generated and handled by the metal shredding facility that are ancillary to metal processing operations at the metal shredding facility.
25095.51.(a)(1)(A)A person who applies for a metal shredding facility permit under this chapter shall enter into a written agreement with the department pursuant to which that person shall reimburse the department for the direct costs reasonably incurred by the department in processing the permit application. The fee shall be sufficient to cover the departments review of the permit application, the conduct of public meetings and notices associated with the permit process, and preparation of the permit. The permit fee shall be established on the basis of the same factors listed in subdivision (b) of Section 25095.50.
(B)The fee shall be in addition to and separate from the annual fee assessed pursuant to Section 25095.50.
(2)An agreement required pursuant to paragraph (1) shall provide for a 25-percent deposit to be made with the submittal of the application. The 25-percent advance payment shall be based upon the departments total estimated costs of processing the application.
(b)(1)Pursuant to Section 21089 of the Public Resources Code, an applicant for a metal shredding facility permit shall also pay all costs incurred by the department for purposes of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), in conjunction with the application.
(2)Paragraph (1) does not apply to projects that are exempt from CEQA.
(c)Funds received pursuant to this section shall be placed in the Metal Shredding Facility Subaccount specified in subdivision (d) of Section 25095.50 and be available for expenditure by the department, upon appropriation by the Legislature, solely for the purposes of implementation and administration of this chapter and Sections 25150.87 and 41514.6.
8.Enforcement25095.60.(a)(1)The authority granted to the department in Article 8 (commencing with Section 25180) of Chapter 6.5 and implementing regulations set forth in Article 3 (commencing with Section 25095.10) of Chapter 22 of Division 4.5 of Title 22 of the California Code of Regulations may be used to enforce this chapter, including, but not limited to, the authority to conduct inspections and pursue administrative or judicial enforcement for violations of this chapter and any implementing regulations, to suspend the authorization of any metal shredding facility that has been determined based on substantial evidence to pose an imminent and substantial endangerment to human health or the environment, and to deny an application for a permit for any of the reasons set forth in paragraph (1) of subdivision (a) of Section 25095.61. These enforcement mechanisms shall apply to violations of this chapter relating to the management of materials listed in subdivision (a) of Sections 25095.20 and 25095.21. Except as provided in paragraph (2), the department shall exercise its enforcement authority under this article in response to any violation of this chapter or of the terms and conditions of a permit issued pursuant to this chapter, and all such enforcement actions shall be deemed to arise under this chapter.
(2)The department has the authority to pursue enforcement under Chapter 6.5 (commencing with Section 25100) for the following violations:
(A)For the operation of a metal shredding facility without having timely submitted a notice of intent and associated operating plans and other information required by paragraph (2) of subdivision (b) of Section 25095.10.
(B)For the operation of a metal shredding facility after a final decision by the department denying or revoking a permit pursuant to this chapter.
(C)For any offsite release of materials listed in Section Sections 25095.20 and Section 25095.21 if they meet the criteria of a hazardous waste pursuant to Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations.
(b)(1)The department may order the temporary cessation of shredder operations and may prohibit the receipt of additional shredder feedstock by the facility, if the owner or operator fails to develop and implement a fire response plan as required by paragraphs (1) and (2) of subdivision (b) of Section 25095.13. The owner or operator may resume shredder operations and receipt of feedstock immediately upon providing written confirmation to the department that the facility is operating in accordance with a fire response plan.
(2)The department may prohibit the receipt of shredder feedstock at a metal shredding facility on a temporary basis if the owner or operator exceeds the limitations relating to pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13. So long as the owner or operator of the facility has developed and is implementing a fire response plan, the facility may continue to conduct metal shredding operations and metal processing operations to reduce the inventory of shredder feedstock or metal shredder aggregate, as appropriate, and may resume receipt of feedstock at the facility immediately upon providing written confirmation to the department compliance with the limitations on pile size and duration have been achieved.
(c)The department shall conduct an annual compliance evaluation inspection of each metal shredding facility regulated under this chapter. The unified program agency or local environmental health official shall be allowed to participate in the inspection.
25095.61.(a)(1)The department may deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility under this chapter. A denial, revocation, or suspension shall be based on at least one of the following:
(A)Noncompliance with a condition of the applicable permit that results in a significant threat to human health or the environment.
(B)An owner or operators failure in the application or during the approval process to disclose fully all relevant facts or a misrepresentation of any relevant fact at any time.
(C)A determination, supported by substantial evidence, that the permitted activity poses a danger to human health or the environment that can only be addressed by permit denial, modification, suspension, or revocation. In such situations, the department shall either deny, modify, suspend, or revoke a permit. Any modifications made by the department shall be consistent with and necessary to ensure compliance with the requirements of this chapter.
(D)Any cause specified in Section 25186.
(2)The department shall provide notice of any adverse action it proposes to be taken to the owner or operator of the metal shredding facility by certified mail with return receipt requested or by personal service.
(3)An owner or operator who wishes to appeal that adverse action shall appeal by submitting a letter to the department, within 10 days of receipt of notice of the adverse action and requesting a hearing.
(4)Except as provided in paragraph (5), proceedings to appeal any decision made by the department under this chapter, including without limitation required modifications to any plan or other information submitted pursuant to Section 25095.10 and the imposition of site-specific conditions or other operating requirements applicable to a metal shredding facility, shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code. Before initiating an appeal, the owner or operator of a facility shall meet and confer with the department in a good faith effort to resolve the dispute.
(5)Proceedings to appeal the departments decision concerning the denial, modification, revocation or suspension of a permit to operate a metal shredding facility pursuant to this chapter shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code.
(6)Any person who submitted written comments on the draft permit may file an appeal of the departments final permit decision with the Office of Administrative Hearings, pursuant to Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code. An appeal filed pursuant to this paragraph shall be limited to those conditions of the final permit that were included in the persons written comments to the department during the public comment period.
(b)An authorization to operate pursuant to this chapter is contingent upon the accuracy of information contained in the notifications and other documents required to be maintained.
(c)(1)The department shall have primary responsibility for enforcement of the terms of this chapter and may refer violations of this chapter to a district attorney or the Attorney General for prosecution. Notwithstanding this authority, a city attorney, county counsel, district attorney, or the Attorney General may maintain a civil or criminal prosecution consistent with their authority. In addition, nothing in this chapter, and no action taken by the department pursuant to this chapter, shall be construed as a limitation on the right of any person to maintain any civil action otherwise authorized by law.
(2)The department shall inform the local health officer and the director of environmental health of a county, city, or district, and the unified program agency for the jurisdiction, of any unlawful disposal of materials that are regulated under Section 25095.20 or 25095.21 of this chapter, and of any enforcement action undertaken against a metal shredding facility within the unified program agencys jurisdiction as a result of that unlawful disposal. Notice shall be provided within 15 days after the department becomes aware of the violation, and the department shall coordinate with the unified program agency regarding the violation.
SEC. 2.Section 25117 of the Health and Safety Code is amended to read:25117.(a)Except as provided in subdivision (d), hazardous waste means a waste that meets any of the criteria for the identification of a hazardous waste adopted by the department pursuant to Section 25141.
(b)Hazardous waste includes, but is not limited to, RCRA hazardous waste.
(c)Unless expressly provided otherwise, hazardous waste also includes extremely hazardous waste and acutely hazardous waste.
(d)Hazardous waste does not include a material that is not waste pursuant to Section 25095.20 or hazardous waste pursuant to Section 25095.21.
(e)Notwithstanding subdivision (a), in any criminal or civil prosecution brought by a city attorney, county counsel, district attorney, or the Attorney General for violation of this chapter, when it is an element of proof that the person knew or reasonably should have known of the violation, or violated the chapter willfully or with reckless disregard for the risk, or acted intentionally or negligently, the element of proof that the waste is hazardous waste may be satisfied by demonstrating that the waste exhibited the characteristics set forth in subdivision (b) of Section 25141.
SEC. 3.Section 25150.82 of the Health and Safety Code is repealed.SEC. 4.Section 25150.84 of the Health and Safety Code is repealed.SEC. 5.Section 25150.86 of the Health and Safety Code is repealed.SEC. 6.Section 25150.87 of the Health and Safety Code is amended to read:25150.87.(a)(1)The department shall require metal shredding facilities, as defined in Section 25095.1, that are subject to Section 41514.6 and this section, to do both of the following:
(A)Monitor hazardous waste constituents requested by the department.
(B)Report the results of the monitoring required pursuant to subparagraph (A) to the department. The facilities may also report those results to the local public health department.
(2)The department shall collect and analyze light fibrous material at the fence lines to determine the potential for release of hazardous waste.
(b)All metal shredding facilities subject to this section shall implement the facilitywide fence-line hazardous waste constituent monitoring requirements developed pursuant to this section.
(c)On or before July 1, 2027, the department shall develop a procedure for community notification of the public for the area in which the metal shredding facility is located, if monitoring pursuant to paragraph (1) of subdivision (a) indicates any release of light fibrous material.
(d)On or before January 1, 2027, the department shall develop regulations to implement, interpret, or make specific this section.
(e)The department shall oversee and enforce the implementation of subdivision (a) pursuant to Article 8 (commencing with Section 25180).
(f)Any reasonable regulatory costs incurred by the department in implementing this section may be reimbursed by the fee on metal shredding facilities imposed pursuant to subdivision (a) of Section 25095.50.
SEC. 7.Section 41514.6 of the Health and Safety Code is amended to read:41514.6.(a)On or before January 1, 2027, a district the jurisdiction of which includes metal shredding facilities, in consultation with the Department of Toxic Substances Control and the Office of Environmental Health Hazard Assessment, shall develop requirements for facilitywide fence-line air quality monitoring at metal shredding facilities, as defined in Section 25095.1, that are subject to Section 25095.50 and this section.
(b)The requirements developed pursuant to subdivision (a) shall include, but not be limited to, all of the following:
(1)Development of threshold levels, in consultation with the Office of Environmental Health Hazard Assessment, for airborne contaminants, including, but not limited to, lead, zinc, cadmium, and nickel, at the fence lines of metal shredding facilities that are protective of air quality and public health. The threshold levels shall follow health guidance values adopted by the Office of Environmental Health Hazard Assessment, if available.
(2)Development of threshold levels for community notification of potential adverse impact on public health based on the threshold values developed pursuant to paragraph (1).
(3)Development of actions, in consultation with the Department of Toxic Substances Control, to be taken by metal shredding facilities if threshold levels developed pursuant to paragraph (1) are exceeded, and a method of enforcing those actions.
(4)Development of community notification procedures to inform the public in areas in which the metal shredding facility is located, if the monitoring required pursuant to this subdivision indicates the threshold levels developed pursuant to paragraph (2) were exceeded.
(5)Reporting the results of the monitoring required pursuant to this subdivision to the district and the local public health department.
(c)All metal shredding facilities subject to this section shall implement the facilitywide fence-line air quality monitoring developed pursuant to this section.
(d)On or before July 1, 2027, a district the jurisdiction of which includes metal shredding facilities shall adopt regulations to implement, interpret, or make specific the requirements pursuant to this section.
(e)A district the jurisdiction of which includes metal shredding facilities shall oversee and enforce the compliance of metal shredding facilities with regulations adopted pursuant to subdivision (d).
(f)Any reasonable regulatory costs incurred by a district in implementing this section may be reimbursed pursuant to its fee authority.
(g)The Office of Environmental Health Hazard Assessments costs to implement this section shall be reimbursed from the subaccount established in the Hazardous Waste Control Account pursuant to Section 25095.50.
SEC. 8.The Legislature finds and declares that metal shredding facilities are essential to a thriving circular economy in the State of California and the regulation of those facilities is a matter of statewide concern and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 1 of this act adding Chapter 6.4 (commencing with Section 25095) to Division 20 of the Health and Safety Code applies to all cities, including charter cities.
SEC. 9.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)Metal shredding facilities are essential to a thriving circular economy in the State of California because they provide an efficient, reliable, and effective means of recycling the millions of tons of recyclable metal, including end-of-life vehicles and household appliances, that are generated annually in the state.
(2)Metal shredding facilities enable the recycling of end-of-life metal products and other metal-containing materials by reducing them in size and facilitating the recovery of ferrous and nonferrous metals and other recyclable commodities. These activities conserve energy and natural resources and support the states goal of reducing the emissions of greenhouse gases and combating climate change.
(3)Metal shredding facilities differ in important respects from waste management facilities. For this reason, regulation and oversight of metal shredding facilities are most appropriately addressed through requirements that are specific to the metal shredding industry, and to individual facilities based on their size and nature of operations, while fully protecting human health and the environment. It is the intent of the Legislature that metal shredding facilities be regulated pursuant to this chapter and not Chapter 6.5 (commencing with Section 25100).
(4)The purpose of this chapter is to establish operating standards and other requirements applicable to metal shredding facilities and to resolve ongoing legal disputes over the regulatory status of metal shredding facilities that operate in the state. The department, the metal shredding industry, and neighboring communities would all benefit from clear, enforceable requirements to govern oversight of metal shredding facilities and their operations and to proactively protect public health and the environment.
(5)Metal shredding operations have the potential to release hazardous materials and impact neighboring communities and the environment if the materials are not properly managed.
(6)This chapter does not alter or override the authority of any other federal, state, or local agency with jurisdiction to regulate the activities of a metal shredding facility in accordance with any other applicable law.
(7)This chapter does not impair the rights of any person under any state or federal law.
(b)It is the intent of the Legislature that this chapter be implemented in a manner that achieves all of the following:
(1)Promotes the economic viability of all metal shredding facilities, regardless of size, so as to ensure the continued capacity of the state to manage the large volume of scrap metal that is produced in California every year.
(2)Protects public health and the environment and all communities, including those that have been designated as disadvantaged or vulnerable pursuant to state law.
(3)Does not cause disproportionate and potentially discriminatory impacts on local communities, consistent with Title VI of the federal Civil Rights Act of 1964 (Public Law 88-352) and Section 11135 of the Government Code.
2.Definitions and General Provisions25095.1.For purposes of this chapter, the following definitions apply:
(a)Chemically treated metal shredder residue or CTMSR means the waste generated from the processing of shredded metallic materials, which may include, but is not limited to, end-of-life vehicles, appliances, and other metal-containing items, by a metal shredding facility where recoverable ferrous or nonferrous metals have been removed and the remaining metal shredder residue has been treated by a waste stabilization process, as described in this chapter.
(b)Corrective action means all actions necessary to mitigate any public health or environmental threat resulting from a release into the environment of hazardous substances from an operating or closed metal shredding facility and to restore the environmental conditions as necessary to protect human health and the environment.
(c)Department means the Department of Toxic Substances Control.
(d)Effective date means the date that this chapter becomes operative.
(e)Existing metal shredding facility means a metal shredding facility that is conducting metal shredding and metal processing operations as of the date that the act adding this chapter is signed into law by the Governor.
(f)Feeder yard means a metal recycling facility that collects, sorts, or processes scrap metal, through means other than the use of a hammer mill, from which scrap metal is sold to customers or transferred to a metal shredding facility for further processing and recycling.
(g)Feedstock means material received by a metal shredding facility before shredding and processing, including, but not limited to, end-of-life vehicles, household appliances, or other forms of light gauge metal suitable for processing in a metal shredder. Feedstock is often referred to as light iron or tin.
(h)Light fibrous material means a fibrous mixture of nonmetallic materials, including, but not limited to, synthetic fabric and carpet fibers, and entrained metallic particles, often representing the lightest fraction of metal shredder aggregate produced from the shredding of end-of-life vehicles and other metallic items, that is susceptible to dispersal into the environment.
(i)Metal processing operations means the stockpiling and handling of metal shredder aggregate, the operations undertaken to separate, sort, and remove ferrous or nonferrous scrap metal from metal shredder aggregate, and the treatment and storage of metal shredder residue. Metal processing operations does not include shredding, crushing, baling, shearing, cutting, or other metal recycling operations unrelated to the handling of metal shredder aggregate.
(j)Metal products means all ferrous and nonferrous metals that have been removed from metal shredder aggregate or from metal shredder residue.
(k)Metal shredder aggregate means the mixture of shredded metallic and nonmetallic materials that is produced by the shredding of metallic feedstock and that is subsequently processed for the purpose of separating, sorting, and removing ferrous metals, nonferrous metals, or other recyclable commodities from nonrecyclable materials. Metal shredder aggregate does not include (1) metals that have been removed from metal shredder aggregate, or (2) metal shredder residue. Metal shredder aggregate is an in-process material and is not a waste or a hazardous waste.
(l)Metal shredder residue means waste comprising shredded plastics, rubber, glass, foam, fabric, carpet, wood, dirt, or other debris, that remains after recoverable ferrous and nonferrous metals or other recyclable commodities have been separated and removed from metal shredder aggregate. Metal shredder residue does not include chemically treated metal shredder residue.
(m)Metal shredding facility means the entire site under the control of the owner or operator of a facility that uses a stationary or mobile shredder, such as a hammer mill or other shredding technique, to process end-of-life vehicles, appliances, or other metallic feedstock materials in order to facilitate the separation, sorting, or removal of recoverable ferrous or nonferrous metals from nonrecyclable materials. Metal shredding facility does not include a feeder yard or other scrap metal recycling facility that operates a metal crusher, a metal shear, or a metal baler if that facility does not conduct metal shredding operations.
(n)New metal shredding facility means a metal shredding facility that had not commenced metal shredding and metal processing operations as of the effective date.
(o)Operator means the person responsible for the overall operation and management of a metal shredding facility.
(p)Owner means a person who owns a metal shredding facility in whole or in part.
(q)Person means any of the following:
(1)An individual, trust, firm, joint stock company, business concern, partnership, limited liability company, association, or corporation, including, but not limited to, a governmental corporation.
(2)A city, county, district, commission, the state, and any department, agency, or political subdivision thereof.
(3)An interstate body.
(4)The federal government and any department or agency thereof, to the extent permitted by law.
(r)Scrap metal has the same meaning as provided in Section 66260.10 of Title 22 of the California Code of Regulations.
(s)Small metal shredding facility means a facility that processes no more than 250 tons per day or 65,000 tons per year of metallic feedstock materials using a stationary hammer mill and meets each of the following conditions:
(1)The facility does not shred whole end-of-life vehicles, whole agricultural equipment, or whole white goods.
(2)The facility does not conduct on-site chemical treatment of metal shredder residue.
(3)The facility does not conduct any activity that requires the use of an on-site thermal oxidizer.
25095.2.The following facilities are not subject to this chapter:
(a)Facilities that shred only e-waste subject to regulation under Chapter 23 (commencing with Section 66273.1) of Division 4.5 of Title 22 of the California Code of Regulations.
(b)Facilities that shred wood or wood products that may contain ancillary metal components, including, but not limited to, screws, bolts, metal ties, and metal strapping.
(c)Facilities that shred only automotive tires.
(d)A feeder yard or other scrap metal recycling facility that operates a metal crusher, metal shear, or metal baler if that facility does not conduct metal shredding operations.
(e)A metal shredding facility that processes exclusively nonferrous metals that do not contain any nonmetallic materials and whose operations do not produce any metal shredder aggregate or result in the generation of metal shredder residue.
25095.3.Metal shredding facilities that are subject to regulation and comply with this chapter are not hazardous waste facilities. However, this chapter does not alter or override the authority of the department or a unified program agency, as defined in Section 25404, to regulate hazardous waste generated at a metal shredding facility in accordance with Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations.
25095.4.(a)On the effective date, the departments Official Policy and Procedure 88-6, titled Auto Shredder Waste Policy and Procedures dated November 21, 1988, is hereby repealed.
(b)On the effective date, any nonhazardous waste determination issued by the department or its predecessor, the State Department of Health Care Services, to any metal shredding facility pursuant to Section 66260.200(f) of Title 22 of the California Code of Regulations is hereby repealed.
25095.5.A citation or reference in this chapter to a requirement of the regulations in Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations or to a specific provision of Chapter 6.5 (commencing with Section 25100) relating to hazardous waste shall be understood to apply the technical requirements of those regulations or standards to metal processing operations authorized pursuant to this chapter and to the materials processed by those operations. operations, notwithstanding the exclusion of those materials from the definitions of waste and hazardous waste established by this chapter. All citations or references to those requirements shall be to the provision as it read on the effective date.
25095.6.This chapter does not limit the authority of a local air pollution control district or air quality management district, as defined in Section 39025, or the authority of a unified program agency, as defined in Section 25404, or the authority of a local environmental health department that is not a unified program agency to regulate any activity at a metal shredding facility that falls within the scope of the agencys jurisdiction under existing law.
25095.7.The department may adopt regulations as necessary to implement this chapter, and thereafter may update and revise the regulations from time to time, consistent with this chapter. The department shall adopt regulations to implement Section 25095.50, relating to the imposition of fees on metal shredding facilities.
25095.8.(a)Except as otherwise expressly defined or provided in this chapter or regulations implementing this chapter, all terms in this chapter that are defined in Article 2 (commencing with Section 25110) of Chapter 6.5 or its implementing regulations shall have the meanings meaning provided in Article 2 (commencing with Section 25110) of Chapter 6.5 and its implementing regulations.
(b)(1)Any reference in this chapter to a requirement of Chapter 6.5 (commencing with Section 25100) or to the regulations in Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations applies to metal processing operations authorized pursuant to this chapter and to the materials processed by those operations.(2)Any reference in this chapter to a requirement of the regulations in Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations or to a specific provision of Chapter 6.5 (commencing with Section 25100) relating to hazardous waste shall apply the technical requirements of those provisions to the materials listed in Sections 25095.20 and 25095.21, notwithstanding the exclusion of those materials from the definitions of waste and hazardous waste established by this chapter. Nothing in this section is intended, or shall be construed, to classify the materials listed in Sections 25095.20 and 25095.21 as waste or hazardous waste.3.Permits and Operations25095.10.(a)(1)Except as provided in paragraph (2), a metal shredding facility shall not operate in California, unless it has a permit issued by the department.
(2)On and after the effective date, an existing metal shredding facility operating in compliance with the requirements of this chapter, including the provisions of a compliance plan approved by the department pursuant to subdivision (a) of Section 25095.11 and the schedule for any interim measures or controls issued pursuant to subdivision (i) of Section 25095.11, may continue to operate pending final action on a permit application as specified in this section. Without exception, the facility shall have developed and shall continuously implement a fire prevention, detection, and response plan and comply with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13. Except as provided in this section, nothing herein shall prevent the department from taking enforcement action pursuant to Article 8 (commencing with Section 25095.60) before issuance of a final permit.
(3)Any permit approved by the department pursuant to this chapter shall include a reference to all permits issued to the facility by other environmental regulatory agencies. Any action taken by the department pursuant to this chapter shall be consistent with the requirements imposed by those regulatory agencies. The department shall evaluate how to apply to metal shredding facilities its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations as described in subdivisions (b) and (c) of Section 25200.21.
(4)(A)Any permit action shall consider the conclusions and recommendations set forth in a community emissions reduction program prepared pursuant to Section 44391.2 and any other health risk assessment conducted by a local air district pursuant to the Air Toxics Hot Spots Information and Assessment Act of 1987 (Part 6 (commencing with Section 44300) of Division 26) or other applicable law. If an air quality health risk assessment has not been conducted, the owner or operator of the facility shall conduct an analysis of equivalent scope and depth as approved by the local air district.
(B)Before taking final action to issue a permit for a metal shredding facility under this chapter, the department shall determine on the basis of substantial evidence that operation of the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities.
(5)Each permit issued under this chapter shall set forth inspection, entry, monitoring, compliance certification, and reporting requirements to assure compliance with the permit terms and conditions. Any report required to be submitted by a metal shredding facility pursuant to a permit issued under this chapter shall be signed by the owner or operator and shall be certified under penalty of law in the manner specified in Section 66270.11 of Title 22 of the California Code of Regulations.
(b)(1)A person who submitted a hazardous waste facility permit application pursuant to Chapter 6.5 (commencing with Section 25100) to treat metal shredder residue before the effective date may withdraw that application and conduct those treatment operations pursuant to this chapter.
(2)Within 30 days of the effective date, the owner or operator of an existing metal shredding facility shall submit a notice of intent to apply for a permit. Thereafter, the owner or operator of an existing metal shredding facility shall apply to the department for a permit pursuant to this chapter no later than six months following submittal of the notice of intent, except a small metal shredding facility shall apply for a permit no later than one year following submittal of the notice of intent. In all cases, the application shall include all of the following information:
(A)A description of the metal processing operations conducted at the metal shredding facility, including all equipment used for this purpose.
(B)A metal shredding facility inspection plan, as specified in paragraph (3) of subdivision (a) of Section 25095.13 including, without limitation, inspection of the area surrounding the hammer mill and all downstream metal processing equipment where light fibrous material is likely to accumulate.
(C)A plan for the prevention, detection, and response to fires that includes, at a minimum, provisions for the continuous monitoring of stockpiles of shredder feedstock and metal shredder aggregate for increases in temperature, periodic fire patrols, regular watering of feedstock and aggregate piles, availability of adequate water supplies, water pressure and fire-fighting equipment at the facility, maintenance of fire lanes, and operator training in fire prevention, detection, and response.
(D)A closure plan.
(E)A metal shredding facility housekeeping plan that includes, but is not limited to, daily cleanup of light fibrous material that is susceptible to dispersal beyond the hammer mill.
(F)An inventory management plan that includes procedures that will be implemented to ensure compliance with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13.
(G)A facility security plan consistent with the requirements of Section 66265.14 of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(H)A preparedness and prevention plan consistent with the requirements of Article 3 (commencing with Section 66265.30) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(I)A contingency plan consistent with the requirements of Article 4 (commencing with Section 66265.50) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(J)A flood plain map, if applicable.
(K)Evidence of financial assurance for closure and third-party liability consistent with the requirements of Article 8 (commencing with Section 66265.140) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(L)A plan describing any offsite or out-of-state transportation and processing of metal shredder aggregate including, but not limited to, the estimated amount of material that is transported, the identity and federal Standard Industrial Classification code of the receiving facility, the estimated amounts of metals that are recovered from the material that is transported offsite, the required insurance, and any other information requested by the department to evaluate whether metal recycling operations are being conducted at the receiving facility.
(M)A compliance plan and schedule if required pursuant to subdivision (a) of Section 25095.11.
(N)A training plan that addresses each of the following areas:
(i)Prevention of releases of metal shredder aggregate, including light fibrous material, and metal shredder residue.
(ii)Fire prevention, detection, and suppression.
(iii)Response to natural disasters, such as earthquakes, wildfires, and floods.
(iv)Emergency response procedures and notification.
(v)Inventory management.
(3)The department shall post all information provided by the owner or operator of a metal shredding facility pursuant to paragraph (2) on the departments internet website in a manner that is readily accessible to the public, consistent with exceptions or exemptions under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
(4)The department shall review the permit application submitted pursuant to paragraph (2) of subdivision (b) as expeditiously as possible and shall take final action to approve, modify, or deny the application within three years after the application has been determined to be complete. For purposes of this subdivision, the department shall consider an application to be complete if it includes each of the plans and other information specified in subdivision (a). Failure of the owner or operator to provide a complete permit application within one year shall be grounds for the department to initiate denial of the application, subject to the following:
(A)The three-year period for review of an application may be extended as necessary for completion of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) process.
(B)If the department does not complete the permit process and issue the permit within three years, the department shall provide written notice to the public, setting forth an explanation for the delay, and shall conduct a public meeting upon request.
(C)If the owner or operator of a facility has timely submitted a complete application and responded to any additional requests for information from the department, the facility may continue to operate, subject to all requirements applicable to the facility under this chapter, pending final action on its permit application even if the department does not complete the permit review process within the timeframe specified in this paragraph.
(5)The owner or operator shall comply with the provisions of each plan required under paragraph (2) as approved by the department and incorporated into the permit for the facility. The department shall impose any additional facility-specific conditions that are necessary to ensure compliance with this chapter and for the protection of human health and the environment. The department shall provide the owner or operator of the metal shredding facility with written findings explaining the basis for any such conditions.
(6)In reviewing any plan submitted pursuant to subparagraph (L) of paragraph (2), the department may request additional information from the owner or operator as necessary to determine the legitimacy of the offsite metal processing operations described in the plan, and may require modifications to the plan, or disapprove the plan, if the department determines that the receiving facility is not engaged in legitimate metal recycling.
(7)In considering an application for a metal shredding facility permit submitted pursuant to this subdivision, and the specific terms and conditions to be included in the permit, the department shall consider the site-specific aspects of the metal shredding facility, including, but not limited to:
(A)The nature of the surrounding community and environment.
(B)The results of any community-specific assessment.
(C)The facility size, location, and configuration.
(D)The equipment, enclosures, and infrastructure.
(E)The specific metal processing operations conducted at the metal shredding facility, including types of feedstocks and annual throughput.
(F)Other relevant site-specific characteristics.
(8)The department shall also conduct at least one site visit to the applicants facility after receipt of the permit application.
(c)(1)The owner or operator of a new metal shredding facility shall submit an application to the department for a permit and shall not commence operations at the new metal shredding facility until the department issues a permit.
(2)The application shall consist of both of the following:
(A)All the information described in paragraph (2) of subdivision (b).
(B)Any other information requested by the department relating to construction or operation of the new metal shredding facility.
(d)(1)The approval of an application for an existing or new metal shredding facility shall be considered a discretionary decision subject to the California Environmental Quality Act ((CEQA) Division 13 (commencing with Section 21000) of the Public Resources Code). Nothing in this chapter is intended to modify, restrict, or expand the provisions of CEQA as applied to metal shredding facilities.
(2)The department may require an applicant for a metal shredding facility permit to submit additional information in support of an application.
(e)A permit issued pursuant to this section shall authorize the storage and processing of metal shredder aggregate, and the onsite chemical treatment of metal shredder residue conducted at the metal shredding facility, if chemical treatment of residue is included in the permit application. A metal shredding facility that begins chemical treatment of metal shredder residue for the first time after the effective date shall notify the department no later than 30 days before commencement of treatment operations at the facility and shall provide the department with all information required by this chapter relating to the chemical treatment operations within 120 days of commencement of operations. This section does not require a permit for the operation of a hammer mill or other equipment used at a metal shredding facility that does not involve the handling of metal shredder aggregate or chemical treatment of metal shredder residue.
(f)(1)Any permit for a metal shredding facility approved under this chapter shall be for a fixed term of 10 years, unless the department determines that a shorter term is necessary to protect human health, safety, or the environment or based on the compliance history of the facility.
(2)At least two years before the expiration of a permit, the owner or operator of a metal shredding facility intending to renew the facilitys permit shall submit a complete application for permit renewal, pursuant to this section, that has been updated to reflect the current operations of the facility.
(3)The department shall review the information and either determine the submission is complete or request additional information from the owner or operator. If the application to renew the permit is submitted before the end of the fixed term, the permit shall be deemed extended until the department has taken final action to renew or deny the renewal application and the owner or operator has exhausted all applicable rights of appeal.
(4)When prioritizing pending renewal applications for review and in determining the need for any new conditions on a renewed permit, the department shall consider any input received from the public.
(g)The department shall consider the compliance history of the metal shredding facility, including the requirements of any permit issued by any other agency in reviewing the facilitys application for permit renewal and in considering the need for additional conditions to be included in the permit.
(h)(1)The requirements of this subdivision apply to all permit applicants.
(2)Before the submission of a permit application or application for permit renewal for a metal shredding facility, the applicant shall hold at least one public meeting, or other community engagement activity approved by the department, to inform the community of metal processing activities and any potential impacts to nearby communities and solicit questions and input from the public. The applicant shall prepare a sign-in sheet for the meeting and allow all attendees an opportunity to provide their names and addresses. The public meeting or community engagement activity shall be noticed to the community at least 30 days in advance, using a form of communication preferred by the community, and be held in an accessible location at a convenient time. The applicant shall invite the department and other regulatory agencies with jurisdiction over the metal shredding facility.
(3)The applicant shall submit a summary of the meeting or activity described in paragraph (2), and a list of attendees and their addresses voluntarily provided pursuant to paragraph (2), if any, and copies of any written comments or materials submitted, if any, to the department as a part of the permit application or application for permit renewal. The summary of the pre-application meeting or activity shall be inclusive of, but not limited to, all of the following:
(A)A summary of the metal shredding facilitys communications to the public about proposed or then current metal processing activities and their potential impacts on nearby communities.
(B)A summary of public input and questions.
(C)Responses to public input and questions and how public input has informed the application materials, if applicable.
(4)After the submission of a complete permit application or application for permit renewal for a facility, and before the public meeting described in paragraph (5), the department shall schedule periodic progress meetings to inform the community of the status of the permitting process, including the owners or operators implementation of any interim measures or controls required by the department pursuant to Section 25095.11. Meetings shall be held pursuant to this paragraph at least once per year and shall be noticed and convened as specified in paragraph (2).
(5)Before a decision is made to approve or deny the application, the department shall solicit comment from the community on the completed application materials and hold a public meeting. The public comment period shall be open for a minimum of 45 days. The department shall respond to all public comments within 60 days of the close of the public comment period. The public comments and the departments responses to the comments shall be included in the administrative record for the permit proceeding and in the departments notice of its intended decision to approve or deny the permit.
(6)Before initiating a public outreach process, the department and the owner or operator of a metal shredding facility shall solicit and incorporate feedback from the surrounding community to determine a locally appropriate process for community engagement.
(i)The department shall post on its internet website general information about each metal shredding facility that has applied for or obtained a permit under this chapter, including without limitation the facilitys current permit status, a schedule for issuance of a draft permit and associated public meetings and opportunity for public comment periods, and a summary of the facilitys compliance history subsequent to the effective date.
25095.11.Notwithstanding Section 25095.10, an owner or operator of a metal shredding facility that has submitted a permit application and is unable to comply with all the requirements of this chapter as of the effective date may continue to operate pending the departments final permit decision, subject to all of the following requirements specified in this section. Failure to meet the requirements of this section shall be subject to enforcement under Article 8 (commencing with Section 25095.60).
(a)(1)The owner or operator identifies in its application each provision of this chapter that the facility is unable to immediately comply with, including without limitation provisions applicable to management of metal shredder aggregate, light fibrous material, and metal shredder residue, and has developed and implemented a plan and schedule approved by the department for achieving compliance with the provisions of this chapter.
(2)Plans shall be submitted along with the permit application required in subdivision (b) of Section 25095.10.
(b)On or before the effective date, the owner or operator complies with the requirements set forth in subdivision (b) of Section 25095.13. A copy of the fire response plan shall be submitted to the department within seven days of the effective date and shall be subject to review and approval of the department after consultation with the facility and the local fire department of the jurisdiction where the facility is located.
(c)On or before the effective date, the owner or operator complies with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13.
(d)The owner or operator initiates, diligently pursues, and implements financial assurance for closure and third-party liability as required pursuant to Section 25095.41, including, but not limited to, both of the following:
(1)The owner or operator submits to the department a cost estimate and closure plan as part of the permit application.
(2)Within 30 days after the permit application is submitted, the owner or operator submits to the department a financial assurance mechanism that is equivalent to the requirements set forth in Sections 66264.143 and 66264.147 of Title 22 of the California Code of Regulations, except that a small metal shredding facility may submit the financial assurance mechanism within 90 days after the permit application is submitted.
(e)The owner or operator initiates and diligently pursues to completion a preliminary endangerment assessment, as required pursuant to Section 25095.30, or otherwise meets the requirements in Section 25095.30 and initiates any required actions identified in the preliminary endangerment assessment.
(f)The owner or operator complies with the standards set forth in Chapter 12 (commencing with Section 66262.10) of Division 4.5 of Title 22 of the California Code of Regulations with respect to all hazardous wastes generated at the facility.
(g)The owner or operator, at a minimum, maintains all existing practices and controls that are in effect or otherwise required by the department, a unified program agency, or a local environmental health department on or before the effective date, that are designed to prevent the possibility of any unplanned sudden or nonsudden release of any of the following into air, soil, or surface water that could threaten human health or the environment:
(1)In-process materials or components thereof, including metal shredder aggregate and light fibrous material.
(2)Hazardous waste or hazardous waste constituents.
(3)Metal shredder residue.
(4)Chemically treated metal shredder residue.
(h)The owner or operator complies with the following standards:
(1)Containment areas shall be in good condition; if there is a leak, contents shall be immediately transferred.
(2)Accumulation areas shall be inspected at least weekly.
(3)Containment areas shall be visibly labeled with contents and start date of accumulation. If labeling is infeasible, a record of the start dates of accumulation shall be maintained and made available to the public upon request.
(4)Incompatible materials shall not be kept together.
(5)All emergency equipment shall be regularly tested or maintained according to manufacturer standards.
(6)Employees shall have unimpeded access to emergency materials.
(7)There shall be at least one person on premises or on call at all times.
(8)Personnel training shall be required for emergency procedures for all possible emergencies and prevention requirements and shall include job specific and general awareness training.
(i)The owner or operator shall be subject to any interim measures or controls established by the department during consideration of the permit application that are necessary for the protection of human health and the environment. The department shall provide the owner or operator of the metal shredding facility with written findings explaining the basis for those interim requirements and a reasonable schedule for compliance with those measures.
25095.12.The owner or operator of a metal shredding facility shall operate the metal shredding facility in accordance with all of the following requirements:
(a)(1)The metal shredding facility shall be maintained and operated to minimize the possibility of a fire, explosion, or any unplanned sudden or nonsudden release of in-process materials or components thereof, including metal shredder aggregate and light fibrous material, into air, soil, or surface water that could threaten human health or the environment by implementing all reasonable and feasible operational or engineering methods of control, including, but not limited to, technologies or equipment taking into consideration the size, configuration, and location of the facility, the characteristics of the materials handled, and other relevant factors.
(2)The owner or operator shall take precautions to prevent accidental ignition or reaction of material that exhibits the characteristics of ignitability or reactivity. While ignitable or reactive material is being handled, the owner or operator shall confine smoking and open flame to specially designated locations. No Smoking signs shall be conspicuously placed wherever there is a hazard from ignitable or reactive material.
(3)The transfer, treatment, storage, or disposal of ignitable or reactive material shall be conducted so that it does not do any of the following:
(A)Generate extreme heat or pressure, fire or explosion, or violent reaction.
(B)Produce uncontrolled toxic mists, fumes, dusts, or gases in sufficient quantities to threaten human health or the environment.
(C)Produce uncontrolled flammable fumes or gases in sufficient quantities to pose a risk of fire or explosions.
(D)Damage the structural integrity of the device or facility containing the material.
(E)Any other activity similar to those listed in subparagraphs (A) to (D), inclusive, that threatens human health or the environment.
(b)(1)The owner or operator of the metal shredding facility shall develop and follow an inbound source control policy designed to prevent the shredding of any of the following materials or wastes at the facility:
(A)RCRA hazardous waste, as defined in Section 66261.100 of Title 22 of the California Code of Regulations, and non-RCRA hazardous waste, as defined in Section 66261.101 of Title 22 of the California Code of Regulations.
(B)Asbestos and asbestos-containing materials, except incidental asbestos-containing material that may be contained inside equipment and is not visible upon inspection.
(C)Radioactive materials.
(D)Petroleum-based wastes, including, but not limited to, used oil as defined in Section 25250.1, gasoline, and diesel, but not including non-free-flowing residual quantities of such wastes contained in depolluted vehicles or appliances.
(E)Polychlorinated biphenyls (PCB) materials and wastes, including, but not limited to, capacitors, electrical transformers, and transformer components.
(F)Fluorescent light ballasts, fluorescent lamps, neon, and high-intensity or mercury vapor lights.
(G)Military ordnance, except ordnance designated specifically as Material Designated as Safe (MDAS).
(H)Explosives, explosive residues, fireworks, and other incendiary materials.
(I)Regulated electronic waste.
(J)Mercury containing devices.
(K)Batteries, including, but not limited to, lead-acid batteries and lithium-ion batteries.
(L)Compressed gas cylinders and propane canisters, unless empty and disabled.
(M)Materials requiring special handling, as defined in Section 42167 of the Public Resources Code.
(2)The inbound source control policy shall contain all of the following:
(A)A written description of the load checking protocol designed to prevent materials or wastes identified in paragraph (1) from being shredded at the facility. Incoming feedstock subject to load checking shall not be shredded until the load-checking process has been completed.
(B)A written description of the process for rejecting loads, specific materials, or wastes that contain the materials or wastes identified in paragraph (1).
(C)A plan and template documents used to demonstrate that load checks are conducted and that materials or wastes identified in paragraph (1) are not accepted.
(D)A requirement to maintain all documentation related to the inbound source control policy and load checking the facility for at least five years and provide the documentation to the department upon request.
(E)A written description of a process to make a waste determination pursuant to Section 66262.11 of Title 22 of the California Code of Regulations for any of the materials or wastes listed in paragraph (1) that are identified after completion of the load check process and that were unknowingly accepted by the facility. Any waste determined to be a hazardous waste shall be considered generated at the metal shredding facility and shall be managed as a hazardous waste in accordance with Chapter 6.5 (commencing with Section 25100) and its implementing regulations.
(c)The owner or operator of the metal shredding facility shall develop and implement procedures for any depollution operations that are conducted at the metal shredding facility involving the removal of automotive fuels, lubricating oils, refrigerants, and materials that require special handling, as defined in Section 42167 of the Public Resources Code, including procedures for the proper management of those materials or wastes that are removed during depollution operations, pursuant to Section 25212.
(d)(1)The owner or operator of the metal shredding facility shall maintain all of the following documents at the metal shredding facility:
(A)A written inspection schedule meeting the substantive requirements of subdivision (b) of Section 66265.15 of Title 22 of the California Code of Regulations.
(B)A written description of training documents, including a syllabus or outline, of the type and amount of both introductory and continuing training that has been given to each person at the metal shredding facility.
(C)A contingency plan that contains the information specified in Section 66265.52 of Title 22 of the California Code of Regulations.
(D)A copy of any local air quality management district or air pollution control district permit and other governmental permits or approvals required for operation of the metal shredding facility equipment.
(E)The closure plan required under Section 25095.40.
(F)A copy of documents related to any environmental investigation and any cleanup or other remediation measures implemented at the facility within the last five years.
(G)The housekeeping plan prepared pursuant to Section 25095.13.
(H)Records of offsite transportation of metal shredder aggregate and CTMSR.
(2)The owner or operator shall make the documents described in paragraph (1) available at the metal shredding facility to the department, the United States Environmental Protection Agency, or a local governmental agency upon request.
(e)The owner or operator of a metal shredding facility shall comply with all of the following:
(1)Subdivision (b) of Section 66265.142 of Title 22 of the California Code of Regulations.
(2)The contingency plan as required in subparagraph (C) of paragraph (1) of subdivision (d).
(3)As applicable, Article 3 (commencing with Section 66265.30) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(4)Article 16 (commencing with Section 66265.370) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(f)The owner or operator of a metal shredding facility shall provide notice to the department of an imminent or actual emergency situation, as required by Section 66265.56 of Title 22 of the California Code of Regulations.
(g)The owner or operator of a metal shredding facility shall provide written notice to the department at least 60 days before transferring ownership or operation of the facility.
(h)The owner or operator shall prevent the unknowing entry, and prevent unauthorized entry, of persons or livestock onto the active portion of the facility.
(i)For any new construction at a facility located in a 100-year floodplain or within the maximum high tide, the facility shall take all reasonable and feasible precautions to prevent washout of any hazardous materials.
(j)For any new construction at a facility, the facility shall take all reasonable and feasible precautions to withstand the maximum credible earthquake.
25095.13.The owner or operator of a metal shredding facility shall develop and comply with plans and minimum standards relating to each of the following aspects of the metal processing operation:
(a)The control of releases, including, but not limited to:
(1)Plans for complying with applicable local air quality management district or air pollution control district regulations and permit requirements, including the requirements of any approved emissions minimization plan or comparable plan required by applicable regulations.
(2)A housekeeping plan that is approved by the department and that does all of the following:
(A)Details all measures to control dispersal of metal shredder aggregate and its constituents, including light fibrous material, and metal shredder residue and constituents. Those measures shall include, but are not limited to, mechanical and manual sweeping, washing or cleaning of equipment and structures to remove accumulated debris, application of water using water trucks, sprinklers, spray bars, deluge systems or other dust suppression equipment, fencing, and enclosures.
(B)Specifies the frequency for each measure detailed pursuant to subparagraph (A).
(C)Addresses the disposition of residuals generated from cleaning, including, but not limited to, debris, sweepings, rinse water, and any other material that does not contain recoverable ferrous or nonferrous metal.
(D)Requires the completion of written logs of all housekeeping activities. The written logs shall be maintained in accordance with Section 25095.12.
(E)Requires the management of any light fibrous material that has been released from the facility to be subject to regulation under Chapter 6.5 (commencing with Section 25100).
(3)A metal shredding facility inspection plan that is approved by the department. The metal shredding facility inspection plan shall include all of the following:
(A)Inspection of all facilities and equipment that is used to manage metal shredder aggregate.
(B)A copy of a general inspection schedule that complies, with the specific requirements in Sections 66264.174, 66264.195, 66264.254, 66265.403, and 66264.1101 of Title 22 of the California Code of Regulations, and, as applicable, complies with the specific requirements in subdivision (i) of Section 66264.193, and Sections 66264.195, 66264.226, 66264.273, 66264.303, 66264.602, 66264.1033, 66264.1052, 66264.1053, 66264.1058, 66264.1084, 66264.1085, 66264.1086, 66265.1088, and 66264.1101 of Title 22 of the California Code of Regulations.
(C)All areas where the deposition of metal shredder aggregate, including light fibrous material and metal shredder residue may occur, including accessible areas within 500 feet of the metal shredding facilitys property boundary or further as determined by the department.
(4)An inventory management plan, that is approved by the department, to prevent accumulation of shredder feedstock and metal shredder aggregate and treated or untreated metal shredder residue in excess of the limitations set forth in subparagraph (E) of paragraph (2) of subdivision (b).
(5)Standards for the installation and maintenance of paving with concrete, steel plate, or other surfacing materials approved by the department that are designed to prevent infiltration and to collect and route water to a water management system. The paving shall be inspected quarterly and repaired as needed. The results of the paving inspections and any paving repairs shall be submitted to the department with the annual report and as requested by the department.
(b)(1)A separate written plan for the prevention, detection, and suppression of fires. The plan shall comply with all of the following:
(A)Be shared with local emergency responders.
(B)Be used to monitor metal shredding facility operations for evidence of incipient fire.
(C)Establish procedures for responding to fires of different duration and severity.
(D)Be activated in response to any incident at the metal shredding facility that falls within the scope of the plan.
(2)The plan shall include all of the following:
(A)Procedures for response to incipient fires and access to adequate water, water pressure, firefighting foam, and other supplies at the metal shredding facility that can be used in responding to an incipient or larger fire.
(B)Training of metal shredding facility personnel in the proper use of fire-response equipment and procedures and notification requirements.
(C)Coordination with local fire departments, the unified program agency, if other than the fire department, and other first responders as necessary to support maximum effectiveness in responding to an emergency at the metal shredding facility.
(D)Monitoring of temperatures on all feedstock and metal shredder aggregate piles, using an infrared camera or other equivalent equipment that continuously monitors the temperature of feedstock and aggregate piles and provides an alarm or other indication of temperature increases outside normal range.
(E)Inventory management provisions necessary to prevent the accumulation of feedstock or metal shredder aggregate at the facility in quantities that exceed the reasonable holding capacity of the facility and that cannot be processed within normal operating cycles, including typical periods of breakdown, maintenance, and repair. The following limits shall apply:
(i)No individual stockpile of feedstock shall exceed the amount of material that can be processed within a 24-hour period.
(ii)No individual pile of metal shredder aggregate shall exceed the amount of material that can be processed within a 48-hour period.
(iii)No individual pile of feedstock or metal shredder aggregate shall remain inactive for more than 48 hours except during periods when the facility is closed or not operating. Periods of breakdown, maintenance and repair, or under other circumstances specified in the facilitys approved inventory management plan, shall not be included in calculating the 48-hour period. A pile shall not be considered inactive if the majority of the material in the pile is removed over a period of 48 hours. In the event of an incident that is required to be reported to the department under Section 25095.31, the department may reduce the number of hours that a pile of feedstock or metal shredder aggregate may remain inactive until the owner or operator demonstrates to the satisfaction of the department and the local fire department that the risk of fire has been mitigated.
(iv)During any period of breakdown and associated repair that exceeds 72 hours, the feedstock and metal shredder aggregate piles shall be subject to additional controls as specified in the facilitys approved inventory management plan. Any shredder feedstock accepted by the facility during a period of breakdown, maintenance, or repair exceeding 72 hours shall be managed in accordance with the facilitys approved inventory management plan.
(v)All feedstock and metal shredder aggregate piles shall be subject to continuous 24-hour onsite surveillance, including when the facility is not operating, and such other additional controls specified in the facilitys approved fire response plan. All electronic surveillance data shall be maintained for a period of at least 14 days following any incident that is required to be reported to the department under Section 25095.31.
(F)Provisions for capture and management of fire suppression water as necessary to prevent discharge into storm drains or runoff into surface water.
(G)Requirement for at least one person to be present at the facility or on call at all times.
(3)The department, in coordination with the local fire department of the jurisdiction where the metal shredding facility is located, shall review a facilitys fire response plan on an annual basis and require the owner or operator to update the plan if necessary based on changes in technology or fire prevention practices, or the facilitys compliance history and history of fire, explosion, or release of hazardous waste or hazardous waste constituents.
(c)Stormwater management and control, including, but not limited to:
(1)Containment of stormwater in retention ponds, sumps, tanks, and associated piping or other engineered retention units to minimize free-standing water at the metal shredding facility.
(2)A stormwater testing plan to identify if stormwater exhibits any characteristics of toxicity as described in Section 66261.24 of Title 22 of the California Code of Regulations.
(3)Compliance with the metal shredding facilitys stormwater pollution prevention plan and spill prevention, control, and countermeasures plan.
(4)Discharge of stormwater in accordance with the general permit for discharges of stormwater associated with industrial activities or waste discharge requirements issued by a regional water quality control board, including sampling requirements.
25095.14.(a)Subject to subdivision (b), the owner or operator of a metal shredding facility may make the following physical or operational changes to the metal shredding facility without seeking prior approval from the department:
(1)Throughput increases and increases in maximum operating rate that are authorized or approved by an air quality management district or air pollution control district.
(2)Increases in efficiency of metal processing operations, including, without limitation, sizing, separation, sorting, removal, and recovery.
(3)Changes in design of processing equipment and conveyance systems.
(4)Changes in operations and methods of operation.
(5)Installation and modification of processing and other equipment and conveyance systems.
(6)Repair and replacement of processing and other equipment and conveyance systems.
(7)Decommissioning and removal of equipment and conveyance systems that are no longer in use.
(8)Construction of new structures and enclosures and changes to structures and enclosures.
(9)Installation and modification of abatement equipment and emission control systems.
(10)Installation of and modifications to water reuse and recycling systems.
(11)Installation of and repair to paving.
(12)Any other changes to the metal shredding facility unrelated to the storage or processing of metal shredder aggregate and metal shredder residue.
(b)Except as provided in subdivision (d), the changes described in subdivision (a) may be made without seeking prior approval from the department if the metal shredding facility maintains substantial compliance with this chapter and the owner or operator provides the department with written notice of these changes within 30 days of making the changes. The department shall post the notice on the section of its internet website that provides information regarding metal shredding facilities.
(c)The department shall evaluate the information provided in the notice from the facility pursuant to this subdivision, as well as any objections from the public, to assess whether the modification could result in a potentially significant impact on the environment. If the department determines that the modification could have a potentially significant impact on the environment, the owner or operator of the facility shall be required to implement changes to the modification as necessary to mitigate the impact to the extent feasible.
(d)The owner or operator of a metal shredding facility that proposes to modify the metal shredding facility in a manner that could result in a significant environmental impact from operations that were not considered by the department in reviewing the information submitted pursuant to this article shall provide the department with 60 days advance written notice of the modification and shall not implement the modification without approval from the department. The department shall provide notice of the proposed modification to the public and shall comply with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) in its review of the project.
(e)(1)On or before July 1 of each year, the owner or operator of a metal shredding facility shall submit an annual report to the department describing the material physical or operational changes, if any, made to the metal shredding facility during the previous calendar year relating to the management of metal shredder aggregate or metal shredder residue.
(2)Upon request by the department, the metal shredding facility shall be required to provide additional information about the nature or extent of changes described in the notice provided pursuant to subdivision (b) or the annual report as necessary to demonstrate the metal shredding facilitys ongoing compliance with applicable regulations.
(3)Physical changes to the metal shredding facilitys ongoing operations that are reported to the department in compliance with paragraph (1) may be reviewed and modified by the department as necessary to ensure compliance with the requirements of this chapter.
25095.15.(a)The owner or operator of a metal shredding facility shall manage all metal shredder aggregate during metal processing operations as necessary to achieve the following minimum standards:
(1)All outdoor equipment used for processing metal shredder aggregate shall be enclosed or covered and designed, operated, and maintained to minimize the possibility of the release of light fibrous material into the environment.
(2)All outdoor equipment used for the conveyance of metal shredder aggregate from one location within the metal shredding facility to another location within the metal shredding facility shall be enclosed or covered and designed, operated, and maintained to minimize the possibility of the release of light fibrous material into the environment.
(3)All vehicles used for the outdoor transfer of metal shredder aggregate shall be loaded and unloaded in a manner that minimizes the possibility of the release of metal shredder aggregate, including light fibrous material into the environment.
(b)Metal shredder aggregate shall be stored or accumulated inside a structure that protects the material from exposure to the elements and minimizes the possibility of the release of light fibrous material into the environment. At a minimum, the structure shall meet all of the following requirements:
(1)The structure shall be enclosed with a floor, roof, and walls sufficient to protect the metal shredder aggregate from exposure to the elements and to contain the metal shredder aggregate and any process residues that are managed in the structure.
(2)The roof shall completely cover all areas used for storage or accumulation of metal shredder aggregate.
(3)The floor shall be constructed of concrete surfacing, steel plate, or other surfacing material approved by the department designed to prevent infiltration and collect and route any water that drains from the metal shredder aggregate to a process water management system. The floor shall be inspected on a quarterly basis and repaired as needed. The results of the inspections and any repairs to the floor shall be included in the annual report submitted to the department pursuant to Section 25095.14.
(4)Any liquids that drain from materials stored inside the enclosure shall be collected and routed to the metal shredding facilitys recycled water management system.
(c)Trommel or augers shall be located in a building or otherwise covered or enclosed so as to minimize the possibility of releases.
(d)Subject to written approval by the department, stockpiling of metal shredder aggregate outside the confines of an enclosure required by subdivision (b) may be allowed for limited periods of time if all of the following conditions are met:
(1)The activity is necessary to accommodate unforeseen circumstances or operational disruptions that prevent the material from being stored inside an enclosure. These unforeseen circumstances or operational disruptions shall have been outside the reasonable control of the facility. The facility shall use best efforts to remedy any unforeseen circumstances or operational disruptions that necessitate outdoor stockpiling of metal shredder aggregate.
(2)The operator provides written notice to the department, the unified program agency, and the local fire department at least 24 hours before the need to store material outside arises.
(3)The operator conducts watering or other dust control measures to minimize the possibility of the release of light fibrous material from the stockpile into the environment.
(4)The outdoor stockpiling activity is conducted for 10 or fewer consecutive operating days.
(5)The outdoor stockpiling activity does not begin until approval is provided by the department. The department may rescind the temporary approval for outdoor stockpiling if the facility is not using best efforts to remedy any unforeseen circumstances or operational disruptions that necessitate outdoor stockpiling.
(e)The requirements of this section shall also apply to the management of untreated and treated metal shredder residue.
25095.16.(a)Metal shredder aggregate that is transported to an offsite metal shredding facility or metal recycling facility for purposes of processing shall be tarped or otherwise contained during shipment and transported in a manner that minimizes the possibility of release into the environment.
(b)The metal shredder aggregate shall be shipped directly to the offsite metal processing facility and shall not be handled at any interim location or held at any publicly accessible interim location for more than four hours unless required by hours of service or other applicable law or held by a rail transporter for reasons outside the control of the person arranging for transport.
(c)Each shipment of metal shredder aggregate by truck or rail shall be identified by a standard bill of lading or other shipping document that complies with applicable United States Department of Transportation requirements and that contains all of the following:
(1)The quantity, by weight, of metal shredder aggregate being transported.
(2)The name, physical and mailing addresses, and telephone number of the metal shredding facility that produced the metal shredder aggregate.
(3)The name, physical and mailing addresses, and telephone number of the metal processing facility that will process the metal shredder aggregate.
(4)The date the shipment of metal shredder aggregate leaves the originating metal shredding facility.
(5)The date the shipment of metal shredder aggregate is scheduled to arrive at the receiving metal processing facility.
(6)The name of the transporter that shipped the metal shredder aggregate from the originating metal shredding facility to the receiving metal processing facility.
(d)The originating metal shredding facility shall retain a copy of all shipping documents onsite, in either paper or electronic form, for a period of at least three years. The three-year record retention period may be extended at the direction of the department during the course of any unresolved enforcement action regarding the shipments.
(e)Transporters shall obtain and maintain liability insurance in accordance with Section 34631.5 of the Vehicle Code. A transporter shall cease to transport metal shredder aggregate upon loss of liability coverage.
(f)The owner or operator of the originating facility shall include in the annual report submitted to the department under Section 25095.14 the total tonnage of metal shredder aggregate that was shipped to another recycling facility for processing during the calendar year, the name of each transporter used for this purpose, the bill of lading numbers, and the total tonnage transported by that transporter during the calendar year, and the name and location of the facilities that processed the material. The department shall handle the information in a manner consistent with exceptions or exemptions under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
4.Classification of Materials25095.20.(a)If managed in accordance with this chapter, including any plans approved by the department and any additional conditions imposed by the department pursuant to Section 25095.10 or 25095.11, the following materials are not waste, as defined in Section 25124, and shall not be subject to regulation under Chapter 6.5 (commencing with Section 25100) of this division or Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations:
(1)Scrap metal.
(2)Metal shredder aggregate that is managed in either of the following ways:
(A)The metal shredder aggregate is stored and processed at the same metal shredding facility that produced the metal shredder aggregate.
(B)The metal shredder aggregate is transferred to another metal shredding facility or metal recycling facility within federal Standard Industrial Classification Code 5093 for the purpose of processing or further processing the metal shredder aggregate to separate and remove ferrous or nonferrous metals, subject to all of the following:
(i)Either one of the following:
(I)The receiving facility is located in the State of California and operates in accordance with the requirements of this chapter.
(II)The receiving facility is located in a state other than the State of California and is operated in accordance with the law of the state where the receiving facility is located.
(ii)Before transportation offsite, the metal shredder aggregate is managed in accordance with the requirements of the plan approved by the department under subparagraph (L) of paragraph (2) of subdivision (b) of Section 25095.10.
(iii)The receiving facility keeps records of the amount of ferrous and nonferrous metal recovered from the metal shredder aggregate and makes this information available to the department upon request.
(iv)The metal shredder aggregate is transported in accordance with the requirements of Section 25095.16.
(3)Intermediate metal products that are subject to further processing to improve product quality.
(4)Finished ferrous and nonferrous metal commodities that are separated or removed from metal shredder aggregate at a metal shredding facility.
(5)Nonmetallic recyclable items recovered from metal shredder aggregate for which a market exists.
(b)Notwithstanding subdivision (a) and any other provision of this chapter, metal shredder aggregate, including light fibrous material, that is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, shall be subject to regulation as hazardous waste under Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations, if it exhibits a characteristic of hazardous waste specified in those regulations.
25095.21.(a)Untreated metal shredder residue that meets the definition of a non-RCRA hazardous waste as defined in Section 66261.101 of Title 22 of the California Code of Regulations shall be chemically treated in accordance with this section or managed in accordance with all applicable requirements of Chapter 6.5 (commencing with Section 25100) and implementing regulations. Chemically treated metal shredder residue is not hazardous waste if all of the following conditions are met:
(1)Unless an alternative treatment recipe is approved by the department, untreated metal shredder residue shall be treated with at least 0.7 gallons of silicate solution per short ton of the untreated metal shredder residue and cement by weight equal to 8.5 percent of the weight of the untreated metal shredder residue.
(2)Metal shredding facilities shall document, on a weekly basis, how many tons of metal shredder residue was treated and how much silicate solution and cement were used in the treatment of the untreated metal shredder residue to comply with paragraph (1).
(3)The chemically treated metal shredder residue does not meet the definition of RCRA hazardous waste, as defined in Section 66261.100 of Title 22 of the California Code of Regulations.
(4)Immediately after waste stabilization, and at all times before offsite transportation and disposal, chemically treated metal shredder residue shall be managed in a manner that prevents releases of chemically treated metal shredder residue outside of a designated accumulation area. The designated accumulation area shall meet the requirements of either of the following:
(A)A self-supporting structure that meets all of the following requirements:
(i)The structure shall be fully or partially enclosed with a floor, at least three walls, and a roof to prevent exposure of the chemically treated metal shredder residue to the elements, including surface transport by precipitation runoff, contamination of soil and groundwater, and wind dispersal outside the enclosure.
(ii)The structure shall be constructed of man-made materials of sufficient strength and thickness to support themselves, the waste contents, any personnel and heavy equipment that operate within the unit, and the stresses of daily operation, such as the movement of personnel, wastes, and handling of equipment within the structure.
(iii)The designated accumulation area shall be labeled or marked clearly with the words Chemically Treated Metal Shredder Residue or CTMSR. The metal shredding facility shall comply with accumulation time limits as required in Section 66262.17 of Title 22 of the California Code of Regulations.
(B)A containment building that meets the requirements of either of the following:
(i)Article 29 (commencing with Section 66264.1100) of Chapter 14 of Title 22 of the California Code of Regulations.
(ii)Article 29 (commencing with Section 66265.1100) of Chapter 15 of Title 22 of the California Code of Regulations.
(b)Chemically treated metal shredder residue shall not be transported to, and shall not be disposed of at, any location other than one of the following:
(1)A composite-lined portion of a solid waste landfill unit that meets all requirements applicable to disposal of municipal solid waste in California after October 9, 1993, based on State Water Resources Control Board Resolution No. 93-62.
(2)A solid waste landfill or other facility that is regulated by waste discharge requirements issued pursuant to Division 7 (commencing with Section 13000) of the Water Code for discharges of designated waste, as defined in Section 13173 of the Water Code, or that allows for the discharge of chemically treated metal shredder residue. The discharge of chemically treated metal shredder residue includes its use as an alternative daily cover or for other beneficial reuse pursuant to Section 41781.3 of the Public Resources Code and the regulations adopted to implement that section.
(3)Any other landfill or location that is authorized by law to receive chemically treated metal shredder residue for disposal or beneficial use.
(c)The transporter of chemically treated metal shredder residue shall comply with all of the following conditions:
(1)Chemically treated metal shredder residue shall be contained and covered during shipment and transported in a manner that prevents any release into the environment.
(2)The transporter shall comply with all applicable United States Department of Transportation shipping requirements.
(3)The vehicle of railcar used to transport chemically treated metal shredder residue shall lack evidence of leakage, spillage, or damage that could cause releases under reasonably foreseeable conditions.
(4)The transporter of chemically treated metal shredder residue shall not transport chemically treated metal shredder residue to a place other than a landfill approved to receive chemically treated metal shredder residue, as described in subdivision (b).
(5)The chemically treated metal shredder residue is not held at any publicly accessible interim location for more than four hours, unless required by other provisions of law, before disposal.
(6)If an unauthorized release of chemically treated metal shredder residue occurs during transportation, the transporter shall immediately contain all releases of chemically treated metal shredder residue and residues from chemically treated metal shredder residue into the environment and determine whether any material resulting from that release is a hazardous waste and, if so, shall manage the hazardous waste in compliance with all applicable requirements of this division. The transporter of chemically treated metal shredder residue is considered the generator of any hazardous waste resulting from the release and is subject to the requirements of Chapter 12 (commencing with Section 66262.10) of Division 4.5 of Title 22 of the California Code of Regulations.
(d)Each shipment of chemically treated metal shredder residue shall be accompanied by a shipping document containing all of the following information:
(1)The quantity, by weight in short tons, of chemically treated metal shredder residue being transported.
(2)The name, physical and mailing addresses, and telephone number of the generating metal shredding facility.
(3)The name, physical and mailing addresses, and telephone number of the destination landfill.
(4)The date the shipment of chemically treated metal shredder residue leaves the metal shredding facility.
(5)The date the shipment of chemically treated metal shredder residue arrives at the destination landfill.
(6)The name and telephone number of the transporter who shipped the chemically treated metal shredder residue from the metal shredding facility to the destination landfill.
(e)The metal shredding facility shall retain onsite a copy of all documentation produced pursuant to this section for at least three years from the date that the chemically treated metal shredder residue that is the subject of the documentation was generated. The department may request the information identified in subdivision (d) in the form of a summary log or a copy of each individual shipping document. The three-year record retention period is automatically extended during the course of any unresolved enforcement action regarding chemically treated metal shredder residue management activity or as requested by the department.
(f)The generating metal shredding facility shall, on or before February 1 of the following year, submit to the department, at the address specified in subdivision (g) of this section, a written annual report containing all of the following information:
(1)The name, physical and mailing addresses, and telephone number of the generating metal shredding facility.
(2)The name, telephone number, and email address of the contact person at the generating metal shredding facility who should be contacted regarding management, transportation, and disposal of chemically treated metal shredder residue.
(3)The name, physical and mailing address, and telephone number for each of the landfills to which the generating metal shredding facility shipped chemically treated metal shredder residue during the previous calendar year.
(4)The total cumulative quantity of chemically treated metal shredder residue, by weight in short tons, shipped to all landfills, and the respective quantity of chemically treated metal shredder residue, by weight in short tons, shipped to each landfill, during the previous calendar year.
(5)The United States Environmental Protection Agency identification number of the generating metal shredding facility.
(g)The metal shredding facility shall provide a copy of any relevant document identified in subdivision (e) upon receipt of a request from the department. Annual reports submitted to the department pursuant to subdivision (f) shall be sent to the following address: Department of Toxic Substances Control, CTMSR Reporting Staff, P.O. Box 806, Sacramento, CA 95812-0806, with the words Attention: CTMSR Annual Report prominently displayed on the front of the envelope.
(h)The owner or operator of a metal shredding facility shall not be required to treat metal shredder residue and shall be exempt from this section if the owner or operator determines, as prescribed in Section 66262.11 of Title 22 of the California Code of Regulations, that the metal shredder residue generated at the facility does not exhibit any state or federal characteristics of hazardous waste, as prescribed in Chapter 11 (commencing with Section 66261.1) of Division 4.5 of Title 22 of the California Code of Regulations.
5.Reporting25095.30.(a)Except as otherwise provided in subdivision (c), within one year after the effective date, the owner or operator of a metal shredding facility shall conduct a preliminary endangerment assessment, as defined in Section 78095, and submit it to the department. The preliminary endangerment assessment shall be conducted in accordance with the most current department guidance manual for evaluating hazardous substance release sites and shall include an evaluation of process areas or locations where releases of materials containing hazardous constituents may have or have occurred, a conceptual site model, and site-specific human health and ecological screening evaluations.
(b)The owner or operator of a metal shredding facility shall conduct appropriate corrective action as needed to address releases of hazardous materials or wastes that pose a significant threat to human health or the environment. This subdivision does not prohibit the department from issuing a corrective action order under Section 25187 subsequent to any investigation of the metal shredding facility.
(c)The owner or operator of a metal shredding facility may demonstrate compliance with this section by providing evidence to the department that, within the last five years, the metal shredding facility has completed an assessment of the metal shredding facility pursuant to an order issued by the department, a regional water quality control board, or any other federal, state, or local agency and is implementing, or has implemented, any corrective action requirements imposed by the agency.
25095.31.(a)The owner or operator of a metal shredding facility shall provide the department with immediate notice of a fire or other incident at the metal shredding facility that requires the assistance of a local fire department or other first responder. This notice shall be in addition to any notice that is required to be made to the Office of Emergency Services pursuant to Section 66265.56 of Title 22 of the California Code of Regulations, the unified program agency, and any other agency under applicable law.
(b)The owner or operator of a metal shredding facility shall establish an effective means of providing public notice to members of the surrounding community upon the occurrence of a fire or other incident that poses a threat to human health or the environment outside of the facility as specified in Section 66265.56 of Title 22 of the California Code of Regulations.
(c)The department shall evaluate how to apply to metal shredding facilities its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations as described in subdivisions (b) and (c) of Section 25200.21.
25095.32.[RESERVED]
6.Closure25095.40.(a)The owner or operator of a metal shredding facility shall have a written closure plan.
(1)The written closure plan shall address all of the following:
(A)The closure and removal of all feedstock, metal shredder aggregate, and treated and untreated metal shredder residue.
(B)The decontamination of equipment and operating areas used for processing metal shredder aggregate.
(C)The treatment of metal shredder residue and management of chemically treated metal shredder residue.
(2)The written closure plan shall include all of the following:
(A)A description of how the equipment and areas used for processing metal shredder aggregate and for treating metal shredder residue will be closed. The description shall identify the maximum extent of the operation during the life of the equipment or area and how all of the following requirements will be met, if applicable:
(i)Section 66265.114 of Title 22 of the California Code of Regulations.
(ii)Subdivisions (a), (b), and paragraphs (1) and (2) of subdivision (c) of Section 66265.197 of Title 22 of the California Code of Regulations.
(iii)Section 66265.404 of Title 22 of the California Code of Regulations.
(B)An estimate of the maximum inventory of metal shredder aggregate and metal shredder residue in storage and in treatment at any time during the operation of the metal shredding facility.
(C)A description of the steps needed to remove or decontaminate an area, equipment, or structure during partial and final closure, including, but not limited to, procedures for cleaning equipment and removing contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required.
(D)An estimate of the expected year of closure and a schedule for final closure. The schedule for final closure shall include, at minimum, the total time required to close each authorized unit.
(3)The written closure plan shall be subject to approval by the department.
(4)An amendment to the written closure plan shall be done in compliance with subdivision (c) of Section 66265.112 of Title 22 of the California Code of Regulations.
(b)The metal shredder facility shall maintain compliance with both of the following requirements regarding closure:
(1)Subdivisions (a) and (b) of Section 66265.111 of Title 22 of the California Code of Regulations, in the same manner as those provisions apply to metal shredding facilities.
(2)Section 66265.114 of Title 22 of the California Code of Regulations.
(c)Within 90 days after processing the final volume of metal shredder aggregate, the owner or operator shall commence closure of the metal shredding facility in accordance with the written closure plan.
(d)The owner or operator shall complete closure activities in accordance with the written closure plan within 180 days after processing the final volume of metal shredder aggregate unless the owner or operator demonstrates to the department any of the following:
(1)The activities required to complete the closure will require longer than 180 days to complete.
(2)The facility has the capacity to process additional metal shredder aggregate.
(3)There is a reasonable likelihood that a person other than the owner or operator will recommence operation of a unit, the equipment or area, closure of the equipment and area would be incompatible with the operation of the metal shredding facility, and the owner or operator has taken and will continue to take all steps necessary to prevent threats to human health and the environment.
(e)The owner or operator shall notify the department and any other agencies having jurisdiction over the closure project at least 15 days before completion of closure.
(f)The owner or operator shall remain in compliance with all applicable requirements of this chapter until the owner or operator submits to the department or authorized agency a certification signed by the owner or operator and by an independent, professional engineer registered in California that closure has been completed in accordance with the written closure plan and that the written closure plan meets or exceeds the applicable requirements of this chapter.
25095.41.(a)The owner or operator shall provide a closure cost estimate to the department consistent with Section 66265.142 of Title 22 of the California Code of Regulations and based on all of the following factors:
(1)The cost of transporting any unprocessed metal shredder aggregate and metal shredder residue to another metal shredding facility for processing or disposal.
(2)The cost of decontaminating all areas and equipment used for storage and processing of metal shredder aggregate.
(3)The cost of decontaminating all areas and equipment used for treatment and storage of treated or untreated metal shredder residue.
(4)The cost for all closure sampling and analysis confirming decontamination sufficiently meets closure performance standards.
(5)The cost of disposition of the maximum amount of metal shredder aggregate and metal shredder residue that may be present at the metal shredding facility at the time of closure.
(6)The cost of closure certification.
(b)For the purpose of calculating the closure cost estimate, the owner or operator may apply the fair market value of any remaining feedstock and metal shredder aggregate against the estimated cost of closure. In addition, the owner or operator may take into consideration metal shredding facility structures, equipment, and other assets that may continue to be used, sold to third parties, or salvaged for scrap value. The closure cost estimate shall also be determined based on the site-specific aspects of the metal shredding facility, including, without limitation, those site-specific aspects specified in Section 25095.40.
(c)The owner or operator shall provide a financial assurance mechanism for closure of the metal shredding facility using one or more of the financial mechanisms described in Section 66265.143 of Title 22 of the California Code of Regulations.
(d)The owner or operator shall provide a financial assurance mechanism for bodily injury and property damage to third parties caused by sudden accidental occurrences arising from operations of the metal shredding facility. The owner or operator shall have and maintain liability coverage for sudden accidental occurrences in the amount of at least one million dollars ($1,000,000) per occurrence with an annual aggregate of at least two million dollars ($2,000,000), exclusive of legal defense costs. The owner or operator may satisfy the requirements of this subdivision through a financial mechanism identified in Section 66265.147 of Title 22 of the California Code of Regulations.
(e)If the facility is required to implement postclosure care following closure of the facility, the owner or operator shall provide a financial assurance mechanism for postclosure using one or more of the financial mechanisms described in Section 66265.145 of Title 22 of the California Code of Regulations.
7.Fees25095.50.(a)The following definitions shall apply for purposes of this article:
(1)Fee rate means the rate to be set by the department for the 202728 fiscal year, as annually adjusted by the Board of Environmental Safety beginning in the 202829 fiscal year and thereafter pursuant to subdivision (b).
(2)Fee schedule means the fee structure established in regulations by the department pursuant to subdivision (b) using the criteria in subdivision (c).
(b)(1)Beginning in the 202829 fiscal year, the rates established by the department shall be reviewed and shall be increased or decreased annually by the Board of Environmental Safety as necessary and shall provide for the assessment of no more than the reasonable and necessary costs of the department and the Office of Environmental Health Hazard Assessment to implement this chapter as described in this section.
(2)The department shall collect an annual fee on all metal shredding facilities that are subject to the requirements of this chapter. The department shall establish and adopt regulations to administer this fee and to establish a fee schedule and rate that is sufficient to cover the departments reasonable costs to implement this chapter and Sections 25150.87 and 41514.6, excluding the costs described in Section 25095.51.
(3)The fee rate shall include, but not be limited to, the costs of fee administration, the costs of collection of the fee, the departments administrative costs, and statewide general administrative costs related to implementation of this chapter and Sections 25150.87 and 41514.6.
(4)The fee rate shall allow for a reserve in the fund each year at an amount sufficient to ensure that all programs funded by the subaccount will not be adversely affected by revenue shortfalls or baseline expenditure adjustments and does not exceed 10 percent of the authorized expenditure levels.
(5)The fees established pursuant to this section shall also be sufficient to cover the Office of Environmental Health Hazard Assessments reasonable costs to implement Sections 25150.87 and 41514.6.
(c)In establishing a fee schedule that may be imposed on a metal shredding facility pursuant to this section, the department shall consider all of the following factors as they relate to the departments reasonable oversight costs:
(1)The facility-specific permit conditions, if any, developed pursuant to paragraph (5) of subdivision (b) of Section 25095.10.
(2)The size of the facility.
(3)The volume of feedstock that is shredded on an annual basis.
(4)The types of feedstock that are shredded at the facility.
(5)The nature of metal processing operations occurring at the facility.
(6)Whether the facility conducts chemical stabilization of metal shredder residue.
(d)The Controller shall establish a new and separate Metal Shredding Facility Subaccount in the Hazardous Waste Control Account. The Metal Shredding Facility Subaccount shall be administered by the Director of Toxic Substances Control. The fees collected pursuant to this section shall be deposited into the Metal Shredding Facility Subaccount and be available for expenditure by the department and the Office of Environmental Health Hazard Assessment, upon appropriation by the Legislature, solely for the purpose of implementation and administration of this chapter and Sections 25150.87 and 41514.6. The Director of Finance, upon request of the Director of Toxic Substances Control, may make a loan from the General Fund to the Metal Shredding Facility Subaccount to meet cash needs. The loan shall be subject to the repayment provisions of Section 16351 of the Government Code and the interest provisions of Section 16314 of the Government Code.
(e)(1)A regulation adopted pursuant to this section may be adopted as an emergency regulation in accordance with Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, and, for purposes of that chapter, including Section 11349.6 of the Government Code, the adoption of these regulations is an emergency and shall be considered by the Office of Administrative Law as necessary for the immediate preservation of the public peace, health, safety, and general welfare. Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, an emergency regulation adopted by the department or the Board of Environmental Safety pursuant to this section shall be filed with, but not be repealed by, the Office of Administrative Law and shall remain in effect for a period of two years or until revised by the department or the Board of Environmental Safety, whichever occurs sooner.
(2)Before adopting a regulation pursuant to this section, the department shall hold at least two public hearings regarding the proposed regulation, including one public hearing dedicated to assessing the impact of the proposed regulation on small metal shredding facilities as defined in this chapter.
(f)(1)A metal shredding facility paying an annual fee in accordance with this section is not subject to any of the following fees set forth in Chapter 6.5 (commencing with Section 25100), with respect to the production, transportation, and processing of metal shredder aggregate, the generation, handling, and management, transportation, and disposal of nonhazardous metal shredder residue:
(A)A fee imposed pursuant to Section 25205.7.
(B)A facility fee imposed pursuant to Section 25205.2.
(C)A fee imposed pursuant to Section 25205.5.
(2)A metal shredding facility is subject to the fees listed in paragraph (1) for any hazardous waste generated and handled by the metal shredding facility that are ancillary to metal processing operations at the metal shredding facility.
25095.51.(a)(1)(A)A person who applies for a metal shredding facility permit under this chapter shall enter into a written agreement with the department pursuant to which that person shall reimburse the department for the direct costs reasonably incurred by the department in processing the permit application. The fee shall be sufficient to cover the departments review of the permit application, the conduct of public meetings and notices associated with the permit process, and preparation of the permit. The permit fee shall be established on the basis of the same factors listed in subdivision (b) of Section 25095.50.
(B)The fee shall be in addition to and separate from the annual fee assessed pursuant to Section 25095.50.
(2)An agreement required pursuant to paragraph (1) shall provide for a 25-percent deposit to be made with the submittal of the application. The 25-percent advance payment shall be based upon the departments total estimated costs of processing the application.
(b)(1)Pursuant to Section 21089 of the Public Resources Code, an applicant for a metal shredding facility permit shall also pay all costs incurred by the department for purposes of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), in conjunction with the application.
(2)Paragraph (1) does not apply to projects that are exempt from CEQA.
(c)Funds received pursuant to this section shall be placed in the Metal Shredding Facility Subaccount specified in subdivision (d) of Section 25095.50 and be available for expenditure by the department, upon appropriation by the Legislature, solely for the purposes of implementation and administration of this chapter and Sections 25150.87 and 41514.6.
8.Enforcement25095.60.(a)(1)The authority granted to the department in Article 8 (commencing with Section 25180) of Chapter 6.5 and implementing regulations set forth in Article 3 (commencing with Section 25095.10) of Chapter 22 of Division 4.5 of Title 22 of the California Code of Regulations may be used to enforce this chapter, including, but not limited to, the authority to conduct inspections and pursue administrative or judicial enforcement for violations of this chapter and any implementing regulations, to suspend the authorization of any metal shredding facility that has been determined based on substantial evidence to pose an imminent and substantial endangerment to human health or the environment, and to deny an application for a permit for any of the reasons set forth in paragraph (1) of subdivision (a) of Section 25095.61. These enforcement mechanisms shall apply to violations of this chapter relating to the management of materials listed in subdivision (a) of Sections 25095.20 and 25095.21. Except as provided in paragraph (2), the department shall exercise its enforcement authority under this article in response to any violation of this chapter or of the terms and conditions of a permit issued pursuant to this chapter, and all such enforcement actions shall be deemed to arise under this chapter.
(2)The department has the authority to pursue enforcement under Chapter 6.5 (commencing with Section 25100) for the following violations:
(A)For the operation of a metal shredding facility without having timely submitted a notice of intent and associated operating plans and other information required by paragraph (2) of subdivision (b) of Section 25095.10.
(B)For the operation of a metal shredding facility after a final decision by the department denying or revoking a permit pursuant to this chapter.
(C)For any offsite release of materials listed in Section 25095.20 and Section 25095.21 if they meet the criteria of a hazardous waste pursuant to Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations.
(b)(1)The department may order the temporary cessation of shredder operations and may prohibit the receipt of additional shredder feedstock by the facility, if the owner or operator fails to develop and implement a fire response plan as required by paragraphs (1) and (2) of subdivision (b) of Section 25095.13. The owner or operator may resume shredder operations and receipt of feedstock immediately upon providing written confirmation to the department that the facility is operating in accordance with a fire response plan.
(2)The department may prohibit the receipt of shredder feedstock at a metal shredding facility on a temporary basis if the owner or operator exceeds the limitations relating to pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13. So long as the owner or operator of the facility has developed and is implementing a fire response plan, the facility may continue to conduct metal shredding operations and metal processing operations to reduce the inventory of shredder feedstock or metal shredder aggregate, as appropriate, and may resume receipt of feedstock at the facility immediately upon providing written confirmation to the department compliance with the limitations on pile size and duration have been achieved.
(c)The department shall conduct an annual compliance evaluation inspection of each metal shredding facility regulated under this chapter. The unified program agency or local environmental health official shall be allowed to participate in the inspection.
25095.61.(a)(1)The department may deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility under this chapter. A denial, revocation, or suspension shall be based on at least one of the following:
(A)Noncompliance with a condition of the applicable permit that results in a significant threat to human health or the environment.
(B)An owner or operators failure in the application or during the approval process to disclose fully all relevant facts or a misrepresentation of any relevant fact at any time.
(C)A determination, supported by substantial evidence, that the permitted activity poses a danger to human health or the environment that can only be addressed by permit denial, modification, suspension, or revocation. In such situations, the department shall either deny, modify, suspend, or revoke a permit. Any modifications made by the department shall be consistent with and necessary to ensure compliance with the requirements of this chapter.
(D)Any cause specified in Section 25186.
(2)The department shall provide notice of any adverse action it proposes to be taken to the owner or operator of the metal shredding facility by certified mail with return receipt requested or by personal service.
(3)An owner or operator who wishes to appeal that adverse action shall appeal by submitting a letter to the department, within 10 days of receipt of notice of the adverse action and requesting a hearing.
(4)Except as provided in paragraph (5), proceedings to appeal any decision made by the department under this chapter, including without limitation required modifications to any plan or other information submitted pursuant to Section 25095.10 and the imposition of site-specific conditions or other operating requirements applicable to a metal shredding facility, shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code. Before initiating an appeal, the owner or operator of a facility shall meet and confer with the department in a good faith effort to resolve the dispute.
(5)Proceedings to appeal the departments decision concerning the denial, modification, revocation or suspension of a permit to operate a metal shredding facility pursuant to this chapter shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code.
(6)Any person who submitted written comments on the draft permit may file an appeal of the departments final permit decision with the Office of Administrative Hearings, pursuant to Chapter 5 (commencing with Section 11500) of Part I Part 1 of Division 3 of Title 22 2 of the Government Code. An appeal filed pursuant to this paragraph shall be limited to those conditions of the final permit that were included in the persons written comments to the department during the public comment period.
(b)An authorization to operate pursuant to this chapter is contingent upon the accuracy of information contained in the notifications and other documents required to be maintained.
(c)(1)The department shall have primary responsibility for enforcement of the terms of this chapter and may refer violations of this chapter to a district attorney or the Attorney General for prosecution. Notwithstanding this authority, a city attorney, county counsel, district attorney, or the Attorney General may maintain a civil or criminal prosecution consistent with their authority. In addition, nothing in this chapter, and no action taken by the department pursuant to this chapter, shall be construed as a limitation on the right of any person to maintain any civil action otherwise authorized by law.
(2)The department shall inform the local health officer and the director of environmental health of a county, city, or district, and the unified program agency for the jurisdiction, of any unlawful disposal of materials that are regulated under Section 25095.20 or 25095.21 of this chapter, and of any enforcement action undertaken against a metal shredding facility within the unified program agencys jurisdiction as a result of that unlawful disposal. Notice shall be provided within 15 days after the department becomes aware of the violation, and the department shall coordinate with the unified program agency regarding the violation.
SEC. 2.Section 25117 of the Health and Safety Code is amended to read:25117.(a)Except as provided in subdivision (d), hazardous waste means a waste that meets any of the criteria for the identification of a hazardous waste adopted by the department pursuant to Section 25141.
(b)Hazardous waste includes, but is not limited to, RCRA hazardous waste.
(c)Unless expressly provided otherwise, hazardous waste also includes extremely hazardous waste and acutely hazardous waste.
(d)Hazardous waste does not include a material that is not waste pursuant to Section 25095.20 or hazardous waste pursuant to Section 25095.21.
(e)Notwithstanding subdivision (a), in any criminal or civil prosecution brought by a city attorney, county counsel, district attorney, or the Attorney General for violation of this chapter, when it is an element of proof that the person knew or reasonably should have known of the violation, or violated the chapter willfully or with reckless disregard for the risk, or acted intentionally or negligently, the element of proof that the waste is hazardous waste may be satisfied by demonstrating that the waste exhibited the characteristics set forth in subdivision (b) of Section 25141.
SEC. 3.Section 25150.82 of the Health and Safety Code is repealed.SEC. 4.Section 25150.84 of the Health and Safety Code is repealed.SEC. 5.Section 25150.86 of the Health and Safety Code is repealed.SEC. 6.Section 25150.87 of the Health and Safety Code is amended to read:25150.87.(a)(1)The department shall require metal shredding facilities, as defined in Section 25095.1, that are subject to Section 41514.6 and this section, to do both of the following:
(A)Monitor hazardous waste constituents requested by the department.
(B)Report the results of the monitoring required pursuant to subparagraph (A) to the department. The facilities may also report those results to the local public health department.
(2)The department shall collect and analyze light fibrous material at the fence lines to determine the potential for release of hazardous waste.
(b)All metal shredding facilities subject to this section shall implement the facilitywide fence-line hazardous waste constituent monitoring requirements developed pursuant to this section.
(c)On or before July 1, 2027, the department shall develop a procedure for community notification of the public for the area in which the metal shredding facility is located, if monitoring pursuant to paragraph (1) of subdivision (a) indicates any release of light fibrous material.
(d)On or before January 1, 2027, the department shall develop regulations to implement, interpret, or make specific this section.
(e)The department shall oversee and enforce the implementation of subdivision (a) pursuant to Article 8 (commencing with Section 25180).
(f)Any reasonable regulatory costs incurred by the department in implementing this section may be reimbursed by the fee on metal shredding facilities imposed pursuant to subdivision (a) of Section 25095.50.
SEC. 7.Section 41514.6 of the Health and Safety Code is amended to read:41514.6.(a)On or before January 1, 2027, a district the jurisdiction of which includes metal shredding facilities, in consultation with the Department of Toxic Substances Control and the Office of Environmental Health Hazard Assessment, shall develop requirements for facilitywide fence-line air quality monitoring at metal shredding facilities, as defined in Section 25095.1, that are subject to Section 25095.50 and this section.
(b)The requirements developed pursuant to subdivision (a) shall include, but not be limited to, all of the following:
(1)Development of threshold levels, in consultation with the Office of Environmental Health Hazard Assessment, for airborne contaminants, including, but not limited to, lead, zinc, cadmium, and nickel, at the fence lines of metal shredding facilities that are protective of air quality and public health. The threshold levels shall follow health guidance values adopted by the Office of Environmental Health Hazard Assessment, if available.
(2)Development of threshold levels for community notification of potential adverse impact on public health based on the threshold values developed pursuant to paragraph (1).
(3)Development of actions, in consultation with the Department of Toxic Substances Control, to be taken by metal shredding facilities if threshold levels developed pursuant to paragraph (1) are exceeded, and a method of enforcing those actions.
(4)Development of community notification procedures to inform the public in areas in which the metal shredding facility is located, if the monitoring required pursuant to this subdivision indicates the threshold levels developed pursuant to paragraph (2) were exceeded.
(5)Reporting the results of the monitoring required pursuant to this subdivision to the district and the local public health department.
(c)All metal shredding facilities subject to this section shall implement the facilitywide fence-line air quality monitoring developed pursuant to this section.
(d)On or before July 1, 2027, a district the jurisdiction of which includes metal shredding facilities shall adopt regulations to implement, interpret, or make specific the requirements pursuant to this section.
(e)A district the jurisdiction of which includes metal shredding facilities shall oversee and enforce the compliance of metal shredding facilities with regulations adopted pursuant to subdivision (d).
(f)Any reasonable regulatory costs incurred by a district in implementing this section may be reimbursed pursuant to its fee authority.
(g)The Office of Environmental Health Hazard Assessments costs to implement this section shall be reimbursed from the subaccount established in the Hazardous Waste Control Account pursuant to Section 25095.50.
SEC. 8.The Legislature finds and declares that metal shredding facilities are essential to a thriving circular economy in the State of California and the regulation of those facilities is a matter of statewide concern and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 1 of this act adding Chapter 6.4 (commencing with Section 25095) to Division 20 of the Health and Safety Code applies to all cities, including charter cities.
SEC. 9.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)Metal shredding facilities are essential to a thriving circular economy in the State of California because they provide an efficient, reliable, and effective means of recycling the millions of tons of recyclable metal, including end-of-life vehicles and household appliances, that are generated annually in the state.
(2)Metal shredding facilities enable the recycling of end-of-life metal products and other metal-containing materials by reducing them in size and facilitating the recovery of ferrous and nonferrous metals and other recyclable commodities. These activities conserve energy and natural resources and support the states goal of reducing the emissions of greenhouse gases and combating climate change.
(3)Metal shredding facilities differ in important respects from waste management facilities. For this reason, regulation and oversight of metal shredding facilities are most appropriately addressed through requirements that are specific to the metal shredding industry, and to individual facilities based on their size and nature of operations, while fully protecting human health and the environment. It is the intent of the Legislature that metal shredding facilities be regulated pursuant to this chapter and not Chapter 6.5 (commencing with Section 25100).
(4)The purpose of this chapter is to establish operating standards and other requirements applicable to metal shredding facilities and to resolve ongoing legal disputes over the regulatory status of metal shredding facilities that operate in the state. The department, the metal shredding industry, and neighboring communities would all benefit from clear, enforceable requirements to govern oversight of metal shredding facilities and their operations and to proactively protect public health and the environment.
(5)Metal shredding operations have the potential to release hazardous materials and impact neighboring communities and the environment if the materials are not properly managed.
(6)This chapter does not alter or override the authority of any other federal, state, or local agency with jurisdiction to regulate the activities of a metal shredding facility in accordance with any other applicable law.
(7)This chapter does not impair the rights of any person under any state or federal law.
(b)It is the intent of the Legislature that this chapter be implemented in a manner that achieves all of the following:
(1)Promotes the economic viability of all metal shredding facilities, regardless of size, so as to ensure the continued capacity of the state to manage the large volume of scrap metal that is produced in California every year.
(2)Protects public health and the environment and all communities, including those that have been designated as disadvantaged or vulnerable pursuant to state law.
(3)Does not cause disproportionate and potentially discriminatory impacts on local communities, consistent with Title VI of the federal Civil Rights Act of 1964 (Public Law 88-352) and Section 11135 of the Government Code.
2.Definitions and General Provisions25095.1.For purposes of this chapter, the following definitions apply:
(a)Chemically treated metal shredder residue or CTMSR means the waste generated from the processing of shredded metallic materials, which may include, but is not limited to, end-of-life vehicles, appliances, and other metal-containing items, by a metal shredding facility where recoverable ferrous or nonferrous metals have been removed and the remaining metal shredder residue has been treated by a waste stabilization process, as described in this chapter.
(b)Corrective action means all actions necessary to mitigate any public health or environmental threat resulting from a release into the environment of hazardous substances from an operating or closed metal shredding facility and to restore the environmental conditions as necessary to protect human health and the environment.
(c)Department means the Department of Toxic Substances Control.
(d)Effective date means the date that this chapter becomes operative.
(e)Existing metal shredding facility means a metal shredding facility that is conducting metal shredding and metal processing operations as of the date that the act adding this chapter is signed into law by the Governor.
(f)Feeder yard means a metal recycling facility that collects, sorts, or processes scrap metal, through means other than the use of a hammer mill, from which scrap metal is sold to customers or transferred to a metal shredding facility for further processing and recycling.
(g)Feedstock means material received by a metal shredding facility before shredding and processing, including, but not limited to, end-of-life vehicles, household appliances, or other forms of light gauge metal suitable for processing in a metal shredder. Feedstock is often referred to as light iron or tin.
(h)Light fibrous material means a fibrous mixture of nonmetallic materials, including, but not limited to, synthetic fabric and carpet fibers, and entrained metallic particles, often representing the lightest fraction of metal shredder aggregate produced from the shredding of end-of-life vehicles and other metallic items, that is susceptible to dispersal into the environment.
(i)Metal processing operations means the stockpiling and handling of metal shredder aggregate, the operations undertaken to separate, sort, and remove ferrous or nonferrous scrap metal from metal shredder aggregate, and the treatment and storage of metal shredder residue. Metal processing operations does not include shredding, crushing, baling, shearing, cutting, or other metal recycling operations unrelated to the handling of metal shredder aggregate.
(j)Metal products means all ferrous and nonferrous metals that have been removed from metal shredder aggregate or from metal shredder residue.
(k)Metal shredder aggregate means the mixture of shredded metallic and nonmetallic materials that is produced by the shredding of metallic feedstock and that is subsequently processed for the purpose of separating, sorting, and removing ferrous metals, nonferrous metals, or other recyclable commodities from nonrecyclable materials. Metal shredder aggregate does not include (1) metals that have been removed from metal shredder aggregate, or (2) metal shredder residue. Metal shredder aggregate is an in-process material and is not a waste or a hazardous waste.
(l)Metal shredder residue means waste comprising shredded plastics, rubber, glass, foam, fabric, carpet, wood, dirt, or other debris, that remains after recoverable ferrous and nonferrous metals or other recyclable commodities have been separated and removed from metal shredder aggregate. Metal shredder residue does not include chemically treated metal shredder residue.
(m)Metal shredding facility means the entire site under the control of the owner or operator of a facility that uses a stationary or mobile shredder, such as a hammer mill or other shredding technique, to process end-of-life vehicles, appliances, or other metallic feedstock materials in order to facilitate the separation, sorting, or removal of recoverable ferrous or nonferrous metals from nonrecyclable materials. Metal shredding facility does not include a feeder yard or other scrap metal recycling facility that operates a metal crusher, a metal shear, or a metal baler if that facility does not conduct metal shredding operations.
(n)New metal shredding facility means a metal shredding facility that had not commenced metal shredding and metal processing operations as of the effective date.
(o)Operator means the person responsible for the overall operation and management of a metal shredding facility.
(p)Owner means a person who owns a metal shredding facility in whole or in part.
(q)Person means any of the following:
(1)An individual, trust, firm, joint stock company, business concern, partnership, limited liability company, association, or corporation, including, but not limited to, a governmental corporation.
(2)A city, county, district, commission, the state, and any department, agency, or political subdivision thereof.
(3)An interstate body.
(4)The federal government and any department or agency thereof, to the extent permitted by law.
(r)Scrap metal has the same meaning as provided in Section 66260.10 of Title 22 of the California Code of Regulations.
(s)Small metal shredding facility means a facility that processes no more than 250 tons per day or 65,000 tons per year of metallic feedstock materials using a stationary hammer mill and meets each of the following conditions:
(1)The facility does not shred whole end-of-life vehicles, whole agricultural equipment, or whole white goods.
(2)The facility does not conduct on-site chemical treatment of metal shredder residue.
(3)The facility does not conduct any activity that requires the use of an on-site thermal oxidizer.
25095.2.The following facilities are not subject to this chapter:
(a)Facilities that shred only e-waste subject to regulation under Chapter 23 (commencing with Section 66273.1) of Division 4.5 of Title 22 of the California Code of Regulations.
(b)Facilities that shred wood or wood products that may contain ancillary metal components, including, but not limited to, screws, bolts, metal ties, and metal strapping.
(c)Facilities that shred only automotive tires.
(d)A feeder yard or other scrap metal recycling facility that operates a metal crusher, metal shear, or metal baler if that facility does not conduct metal shredding operations.
(e)A metal shredding facility that processes exclusively nonferrous metals that do not contain any nonmetallic materials and whose operations do not produce any metal shredder aggregate or result in the generation of metal shredder residue.
25095.3.Metal shredding facilities that are subject to regulation and comply with this chapter are not hazardous waste facilities. However, this chapter does not alter or override the authority of the department or a unified program agency, as defined in Section 25404, to regulate hazardous waste generated at a metal shredding facility in accordance with Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations.
25095.4.(a)On the effective date, the departments Official Policy and Procedure 88-6, titled Auto Shredder Waste Policy and Procedures dated November 21, 1988, is hereby repealed.
(b)On the effective date, any nonhazardous waste determination issued by the department or its predecessor, the State Department of Health Care Services, to any metal shredding facility pursuant to Section 66260.200(f) of Title 22 of the California Code of Regulations is hereby repealed.
25095.5.A citation or reference in this chapter to a requirement of the regulations in Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations or to a specific provision of Chapter 6.5 (commencing with Section 25100) shall be understood to apply the technical requirements of those regulations or standards to metal processing operations authorized pursuant to this chapter and to the materials processed by those operations. All citations or references to those requirements shall be to the provision as it read on the effective date.
25095.6.This chapter does not limit the authority of a local air pollution control district or air quality management district, as defined in Section 39025, or the authority of a unified program agency, as defined in Section 25404, or the authority of a local environmental health department that is not a unified program agency to regulate any activity at a metal shredding facility that falls within the scope of the agencys jurisdiction under existing law.
25095.7.The department may adopt regulations as necessary to implement this chapter, and thereafter may update and revise the regulations from time to time, consistent with this chapter. The department shall adopt regulations to implement Section 25095.50, relating to the imposition of fees on metal shredding facilities.
25095.8.(a)Except as otherwise expressly defined or provided in this chapter or regulations implementing this chapter, all terms in this chapter that are defined in Article 2 (commencing with Section 25110) of Chapter 6.5 or its implementing regulations shall have the meanings provided in Article 2 (commencing with Section 25110) of Chapter 6.5 and its implementing regulations.
(b)(1)Any reference in this chapter to a requirement of Chapter 6.5 (commencing with Section 25100) or to the regulations in Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations applies to metal processing operations authorized pursuant to this chapter and to the materials processed by those operations.
(2)Any reference in this chapter to a requirement of the regulations in Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations or to a specific provision of Chapter 6.5 (commencing with Section 25100) relating to hazardous waste shall apply the technical requirements of those provisions to the materials listed in Sections 25095.20 and 25095.21, notwithstanding the exclusion of those materials from the definitions of waste and hazardous waste established by this chapter. Nothing in this section is intended, or shall be construed, to classify the materials listed in Sections 25095.20 and 25095.21 as waste or hazardous waste.
3.Permits and Operations25095.10.(a)(1)Except as provided in paragraph (2), a metal shredding facility shall not operate in California, unless it has a permit issued by the department.
(2)On and after the effective date, an existing metal shredding facility operating in compliance with the requirements of this chapter, including the provisions of a compliance plan approved by the department pursuant to subdivision (a) of Section 25095.11 and the schedule for any interim measures or controls issued pursuant to subdivision (i) of Section 25095.11, may continue to operate pending final action on a permit application as specified in this section. Without exception, the facility shall have developed and shall continuously implement a fire prevention, detection, and response plan and comply with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13. Except as provided in this section, nothing herein shall prevent the department from taking enforcement action pursuant to Article 8 (commencing with Section 25095.60) before issuance of a final permit.
(3)Any permit approved by the department pursuant to this chapter shall include a reference to all permits issued to the facility by other environmental regulatory agencies. Any action taken by the department pursuant to this chapter shall be consistent with the requirements imposed by those regulatory agencies. The department shall evaluate how to apply to metal shredding facilities its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations as described in subdivisions (b) and (c) of Section 25200.21.
(4)(A)Any permit action shall consider the conclusions and recommendations set forth in a community emissions reduction program prepared pursuant to Section 44391.2 and any other health risk assessment conducted by a local air district pursuant to the Air Toxics Hot Spots Information and Assessment Act of 1987 (Part 6 (commencing with Section 44300) of Division 26) or other applicable law. If an air quality health risk assessment has not been conducted, the owner or operator of the facility shall conduct an analysis of equivalent scope and depth as approved by the local air district.
(B)Before taking final action to issue a permit for a metal shredding facility under this chapter, the department shall determine on the basis of substantial evidence that operation of the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities.
(5)Each permit issued under this chapter shall set forth inspection, entry, monitoring, compliance certification, and reporting requirements to assure compliance with the permit terms and conditions. Any report required to be submitted by a metal shredding facility pursuant to a permit issued under this chapter shall be signed by the owner or operator and shall be certified under penalty of law in the manner specified in Section 66270.11 of Title 22 of the California Code of Regulations.
(b)(1)A person who submitted a hazardous waste facility permit application pursuant to Chapter 6.5 (commencing with Section 25100) to treat metal shredder residue before the effective date may withdraw that application and conduct those treatment operations pursuant to this chapter.
(2)Within 30 days of the effective date, the owner or operator of an existing metal shredding facility shall submit a notice of intent to apply for a permit. Thereafter, the owner or operator of an existing metal shredding facility shall apply to the department for a permit pursuant to this chapter no later than six months following submittal of the notice of intent, except a small metal shredding facility shall apply for a permit no later than one year following submittal of the notice of intent. In all cases, the application shall include all of the following information:
(A)A description of the metal processing operations conducted at the metal shredding facility, including all equipment used for this purpose.
(B)A metal shredding facility inspection plan, as specified in paragraph (3) of subdivision (a) of Section 25095.13 including, without limitation, inspection of the area surrounding the hammer mill and all downstream metal processing equipment where light fibrous material is likely to accumulate.
(C)A plan for the prevention, detection, and response to fires that includes, at a minimum, provisions for the continuous monitoring of stockpiles of shredder feedstock and metal shredder aggregate for increases in temperature, periodic fire patrols, regular watering of feedstock and aggregate piles, availability of adequate water supplies, water pressure and fire-fighting equipment at the facility, maintenance of fire lanes, and operator training in fire prevention, detection, and response.
(D)A closure plan.
(E)A metal shredding facility housekeeping plan that includes, but is not limited to, daily cleanup of light fibrous material that is susceptible to dispersal beyond the hammer mill.
(F)An inventory management plan that includes procedures that will be implemented to ensure compliance with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13.
(G)A facility security plan consistent with the requirements of Section 66265.14 of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(H)A preparedness and prevention plan consistent with the requirements of Article 3 (commencing with Section 66265.30) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(I)A contingency plan consistent with the requirements of Article 4 (commencing with Section 66265.50) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(J)A flood plain map, if applicable.
(K)Evidence of financial assurance for closure and third-party liability consistent with the requirements of Article 8 (commencing with Section 66265.140) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(L)A plan describing any offsite or out-of-state transportation and processing of metal shredder aggregate including, but not limited to, the estimated amount of material that is transported, the identity and federal Standard Industrial Classification code of the receiving facility, the estimated amounts of metals that are recovered from the material that is transported offsite, the required insurance, and any other information requested by the department to evaluate whether metal recycling operations are being conducted at the receiving facility.
(M)A compliance plan and schedule if required pursuant to subdivision (a) of Section 25095.11.
(N)A training plan that addresses each of the following areas:
(i)Prevention of releases of metal shredder aggregate, including light fibrous material, and metal shredder residue.
(ii)Fire prevention, detection, and suppression.
(iii)Response to natural disasters, such as earthquakes, wildfires, and floods.
(iv)Emergency response procedures and notification.
(v)Inventory management.
(3)The department shall post all information provided by the owner or operator of a metal shredding facility pursuant to paragraph (2) on the departments internet website in a manner that is readily accessible to the public, consistent with exceptions or exemptions under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
(4)The department shall review the permit application submitted pursuant to paragraph (2) of subdivision (b) as expeditiously as possible and shall take final action to approve, modify, or deny the application within three years after the application has been determined to be complete. For purposes of this subdivision, the department shall consider an application to be complete if it includes each of the plans and other information specified in subdivision (a). Failure of the owner or operator to provide a complete permit application within one year shall be grounds for the department to initiate denial of the application, subject to the following:
(A)The three-year period for review of an application may be extended as necessary for completion of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) process.
(B)If the department does not complete the permit process and issue the permit within three years, the department shall provide written notice to the public, setting forth an explanation for the delay, and shall conduct a public meeting upon request.
(C)If the owner or operator of a facility has timely submitted a complete application and responded to any additional requests for information from the department, the facility may continue to operate, subject to all requirements applicable to the facility under this chapter, pending final action on its permit application even if the department does not complete the permit review process within the timeframe specified in this paragraph.
(5)The owner or operator shall comply with the provisions of each plan required under paragraph (2) as approved by the department and incorporated into the permit for the facility. The department shall impose any additional facility-specific conditions that are necessary to ensure compliance with this chapter and for the protection of human health and the environment. The department shall provide the owner or operator of the metal shredding facility with written findings explaining the basis for any such conditions.
(6)In reviewing any plan submitted pursuant to subparagraph (L) of paragraph (2), the department may request additional information from the owner or operator as necessary to determine the legitimacy of the offsite metal processing operations described in the plan, and may require modifications to the plan, or disapprove the plan, if the department determines that the receiving facility is not engaged in legitimate metal recycling.
(7)In considering an application for a metal shredding facility permit submitted pursuant to this subdivision, and the specific terms and conditions to be included in the permit, the department shall consider the site-specific aspects of the metal shredding facility, including, but not limited to:
(A)The nature of the surrounding community and environment.
(B)The results of any community-specific assessment.
(C)The facility size, location, and configuration.
(D)The equipment, enclosures, and infrastructure.
(E)The specific metal processing operations conducted at the metal shredding facility, including types of feedstocks and annual throughput.
(F)Other relevant site-specific characteristics.
(8)The department shall also conduct at least one site visit to the applicants facility after receipt of the permit application.
(c)(1)The owner or operator of a new metal shredding facility shall submit an application to the department for a permit and shall not commence operations at the new metal shredding facility until the department issues a permit.
(2)The application shall consist of both of the following:
(A)All the information described in paragraph (2) of subdivision (b).
(B)Any other information requested by the department relating to construction or operation of the new metal shredding facility.
(d)(1)The approval of an application for an existing or new metal shredding facility shall be considered a discretionary decision subject to the California Environmental Quality Act ((CEQA) Division 13 (commencing with Section 21000) of the Public Resources Code). Nothing in this chapter is intended to modify, restrict, or expand the provisions of CEQA as applied to metal shredding facilities.
(2)The department may require an applicant for a metal shredding facility permit to submit additional information in support of an application.
(e)A permit issued pursuant to this section shall authorize the storage and processing of metal shredder aggregate, and the onsite chemical treatment of metal shredder residue conducted at the metal shredding facility, if chemical treatment of residue is included in the permit application. A metal shredding facility that begins chemical treatment of metal shredder residue for the first time after the effective date shall notify the department no later than 30 days before commencement of treatment operations at the facility and shall provide the department with all information required by this chapter relating to the chemical treatment operations within 120 days of commencement of operations. This section does not require a permit for the operation of a hammer mill or other equipment used at a metal shredding facility that does not involve the handling of metal shredder aggregate or chemical treatment of metal shredder residue.
(f)(1)Any permit for a metal shredding facility approved under this chapter shall be for a fixed term of 10 years, unless the department determines that a shorter term is necessary to protect human health, safety, or the environment or based on the compliance history of the facility.
(2)At least two years before the expiration of a permit, the owner or operator of a metal shredding facility intending to renew the facilitys permit shall submit a complete application for permit renewal, pursuant to this section, that has been updated to reflect the current operations of the facility.
(3)The department shall review the information and either determine the submission is complete or request additional information from the owner or operator. If the application to renew the permit is submitted before the end of the fixed term, the permit shall be deemed extended until the department has taken final action to renew or deny the renewal application and the owner or operator has exhausted all applicable rights of appeal.
(4)When prioritizing pending renewal applications for review and in determining the need for any new conditions on a renewed permit, the department shall consider any input received from the public.
(g)The department shall consider the compliance history of the metal shredding facility, including the requirements of any permit issued by any other agency in reviewing the facilitys application for permit renewal and in considering the need for additional conditions to be included in the permit.
(h)(1)The requirements of this subdivision apply to all permit applicants.
(2)Before the submission of a permit application or application for permit renewal for a metal shredding facility, the applicant shall hold at least one public meeting, or other community engagement activity approved by the department, to inform the community of metal processing activities and any potential impacts to nearby communities and solicit questions and input from the public. The applicant shall prepare a sign-in sheet for the meeting and allow all attendees an opportunity to provide their names and addresses. The public meeting or community engagement activity shall be noticed to the community at least 30 days in advance, using a form of communication preferred by the community, and be held in an accessible location at a convenient time. The applicant shall invite the department and other regulatory agencies with jurisdiction over the metal shredding facility.
(3)The applicant shall submit a summary of the meeting or activity described in paragraph (2), and a list of attendees and their addresses voluntarily provided pursuant to paragraph (2), if any, and copies of any written comments or materials submitted, if any, to the department as a part of the permit application or application for permit renewal. The summary of the pre-application meeting or activity shall be inclusive of, but not limited to, all of the following:
(A)A summary of the metal shredding facilitys communications to the public about proposed or then current metal processing activities and their potential impacts on nearby communities.
(B)A summary of public input and questions.
(C)Responses to public input and questions and how public input has informed the application materials, if applicable.
(4)After the submission of a complete permit application or application for permit renewal for a facility, and before the public meeting described in paragraph (5), the department shall schedule periodic progress meetings to inform the community of the status of the permitting process, including the owners or operators implementation of any interim measures or controls required by the department pursuant to Section 25095.11. Meetings shall be held pursuant to this paragraph at least once per year and shall be noticed and convened as specified in paragraph (2).
(5)Before a decision is made to approve or deny the application, the department shall solicit comment from the community on the completed application materials and hold a public meeting. The public comment period shall be open for a minimum of 45 days. The department shall respond to all public comments within 60 days of the close of the public comment period. The public comments and the departments responses to the comments shall be included in the administrative record for the permit proceeding and in the departments notice of its intended decision to approve or deny the permit.
(6)Before initiating a public outreach process, the department and the owner or operator of a metal shredding facility shall solicit and incorporate feedback from the surrounding community to determine a locally appropriate process for community engagement.
(i)The department shall post on its internet website general information about each metal shredding facility that has applied for or obtained a permit under this chapter, including without limitation the facilitys current permit status, a schedule for issuance of a draft permit and associated public meetings and opportunity for public comment periods, and a summary of the facilitys compliance history subsequent to the effective date.
25095.11.Notwithstanding Section 25095.10, an owner or operator of a metal shredding facility that has submitted a permit application and is unable to comply with all the requirements of this chapter as of the effective date may continue to operate pending the departments final permit decision, subject to all of the following requirements specified in this section. Failure to meet the requirements of this section shall be subject to enforcement under Article 8 (commencing with Section 25095.60).
(a)(1)The owner or operator identifies in its application each provision of this chapter that the facility is unable to immediately comply with, including without limitation provisions applicable to management of metal shredder aggregate, light fibrous material, and metal shredder residue, and has developed and implemented a plan and schedule approved by the department for achieving compliance with the provisions of this chapter.
(2)Plans shall be submitted along with the permit application required in subdivision (b) of Section 25095.10.
(b)On or before the effective date, the owner or operator complies with the requirements set forth in subdivision (b) of Section 25095.13. A copy of the fire response plan shall be submitted to the department within seven days of the effective date and shall be subject to review and approval of the department after consultation with the facility and the local fire department of the jurisdiction where the facility is located.
(c)On or before the effective date, the owner or operator complies with the limitations on pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13.
(d)The owner or operator initiates, diligently pursues, and implements financial assurance for closure and third-party liability as required pursuant to Section 25095.41, including, but not limited to, both of the following:
(1)The owner or operator submits to the department a cost estimate and closure plan as part of the permit application.
(2)Within 30 days after the permit application is submitted, the owner or operator submits to the department a financial assurance mechanism that is equivalent to the requirements set forth in Sections 66264.143 and 66264.147 of Title 22 of the California Code of Regulations, except that a small metal shredding facility may submit the financial assurance mechanism within 90 days after the permit application is submitted.
(e)The owner or operator initiates and diligently pursues to completion a preliminary endangerment assessment, as required pursuant to Section 25095.30, or otherwise meets the requirements in Section 25095.30 and initiates any required actions identified in the preliminary endangerment assessment.
(f)The owner or operator complies with the standards set forth in Chapter 12 (commencing with Section 66262.10) of Division 4.5 of Title 22 of the California Code of Regulations with respect to all hazardous wastes generated at the facility.
(g)The owner or operator, at a minimum, maintains all existing practices and controls that are in effect or otherwise required by the department, a unified program agency, or a local environmental health department on or before the effective date, that are designed to prevent the possibility of any unplanned sudden or nonsudden release of any of the following into air, soil, or surface water that could threaten human health or the environment:
(1)In-process materials or components thereof, including metal shredder aggregate and light fibrous material.
(2)Hazardous waste or hazardous waste constituents.
(3)Metal shredder residue.
(4)Chemically treated metal shredder residue.
(h)The owner or operator complies with the following standards:
(1)Containment areas shall be in good condition; if there is a leak, contents shall be immediately transferred.
(2)Accumulation areas shall be inspected at least weekly.
(3)Containment areas shall be visibly labeled with contents and start date of accumulation. If labeling is infeasible, a record of the start dates of accumulation shall be maintained and made available to the public upon request.
(4)Incompatible materials shall not be kept together.
(5)All emergency equipment shall be regularly tested or maintained according to manufacturer standards.
(6)Employees shall have unimpeded access to emergency materials.
(7)There shall be at least one person on premises or on call at all times.
(8)Personnel training shall be required for emergency procedures for all possible emergencies and prevention requirements and shall include job specific and general awareness training.
(i)The owner or operator shall be subject to any interim measures or controls established by the department during consideration of the permit application that are necessary for the protection of human health and the environment. The department shall provide the owner or operator of the metal shredding facility with written findings explaining the basis for those interim requirements and a reasonable schedule for compliance with those measures.
25095.12.The owner or operator of a metal shredding facility shall operate the metal shredding facility in accordance with all of the following requirements:
(a)(1)The metal shredding facility shall be maintained and operated to minimize the possibility of a fire, explosion, or any unplanned sudden or nonsudden release of in-process materials or components thereof, including metal shredder aggregate and light fibrous material, into air, soil, or surface water that could threaten human health or the environment by implementing all reasonable and feasible operational or engineering methods of control, including, but not limited to, technologies or equipment taking into consideration the size, configuration, and location of the facility, the characteristics of the materials handled, and other relevant factors.
(2)The owner or operator shall take precautions to prevent accidental ignition or reaction of material that exhibits the characteristics of ignitability or reactivity. While ignitable or reactive material is being handled, the owner or operator shall confine smoking and open flame to specially designated locations. No Smoking signs shall be conspicuously placed wherever there is a hazard from ignitable or reactive material.
(3)The transfer, treatment, storage, or disposal of ignitable or reactive material shall be conducted so that it does not do any of the following:
(A)Generate extreme heat or pressure, fire or explosion, or violent reaction.
(B)Produce uncontrolled toxic mists, fumes, dusts, or gases in sufficient quantities to threaten human health or the environment.
(C)Produce uncontrolled flammable fumes or gases in sufficient quantities to pose a risk of fire or explosions.
(D)Damage the structural integrity of the device or facility containing the material.
(E)Any other activity similar to those listed in subparagraphs (A) to (D), inclusive, that threatens human health or the environment.
(b)(1)The owner or operator of the metal shredding facility shall develop and follow an inbound source control policy designed to prevent the shredding of any of the following materials or wastes at the facility:
(A)RCRA hazardous waste, as defined in Section 66261.100 of Title 22 of the California Code of Regulations, and non-RCRA hazardous waste, as defined in Section 66261.101 of Title 22 of the California Code of Regulations.
(B)Asbestos and asbestos-containing materials, except incidental asbestos-containing material that may be contained inside equipment and is not visible upon inspection.
(C)Radioactive materials.
(D)Petroleum-based wastes, including, but not limited to, used oil as defined in Section 25250.1, gasoline, and diesel, but not including non-free-flowing residual quantities of such wastes contained in depolluted vehicles or appliances.
(E)Polychlorinated biphenyls (PCB) materials and wastes, including, but not limited to, capacitors, electrical transformers, and transformer components.
(F)Fluorescent light ballasts, fluorescent lamps, neon, and high-intensity or mercury vapor lights.
(G)Military ordnance, except ordnance designated specifically as Material Designated as Safe (MDAS).
(H)Explosives, explosive residues, fireworks, and other incendiary materials.
(I)Regulated electronic waste.
(J)Mercury containing devices.
(K)Batteries, including, but not limited to, lead-acid batteries and lithium-ion batteries.
(L)Compressed gas cylinders and propane canisters, unless empty and disabled.
(M)Materials requiring special handling, as defined in Section 42167 of the Public Resources Code.
(2)The inbound source control policy shall contain all of the following:
(A)A written description of the load checking protocol designed to prevent materials or wastes identified in paragraph (1) from being shredded at the facility. Incoming feedstock subject to load checking shall not be shredded until the load-checking process has been completed.
(B)A written description of the process for rejecting loads, specific materials, or wastes that contain the materials or wastes identified in paragraph (1).
(C)A plan and template documents used to demonstrate that load checks are conducted and that materials or wastes identified in paragraph (1) are not accepted.
(D)A requirement to maintain all documentation related to the inbound source control policy and load checking the facility for at least five years and provide the documentation to the department upon request.
(E)A written description of a process to make a waste determination pursuant to Section 66262.11 of Title 22 of the California Code of Regulations for any of the materials or wastes listed in paragraph (1) that are identified after completion of the load check process and that were unknowingly accepted by the facility. Any waste determined to be a hazardous waste shall be considered generated at the metal shredding facility and shall be managed as a hazardous waste in accordance with Chapter 6.5 (commencing with Section 25100) and its implementing regulations.
(c)The owner or operator of the metal shredding facility shall develop and implement procedures for any depollution operations that are conducted at the metal shredding facility involving the removal of automotive fuels, lubricating oils, refrigerants, and materials that require special handling, as defined in Section 42167 of the Public Resources Code, including procedures for the proper management of those materials or wastes that are removed during depollution operations, pursuant to Section 25212.
(d)(1)The owner or operator of the metal shredding facility shall maintain all of the following documents at the metal shredding facility:
(A)A written inspection schedule meeting the substantive requirements of subdivision (b) of Section 66265.15 of Title 22 of the California Code of Regulations.
(B)A written description of training documents, including a syllabus or outline, of the type and amount of both introductory and continuing training that has been given to each person at the metal shredding facility.
(C)A contingency plan that contains the information specified in Section 66265.52 of Title 22 of the California Code of Regulations.
(D)A copy of any local air quality management district or air pollution control district permit and other governmental permits or approvals required for operation of the metal shredding facility equipment.
(E)The closure plan required under Section 25095.40.
(F)A copy of documents related to any environmental investigation and any cleanup or other remediation measures implemented at the facility within the last five years.
(G)The housekeeping plan prepared pursuant to Section 25095.13.
(H)Records of offsite transportation of metal shredder aggregate and CTMSR.
(2)The owner or operator shall make the documents described in paragraph (1) available at the metal shredding facility to the department, the United States Environmental Protection Agency, or a local governmental agency upon request.
(e)The owner or operator of a metal shredding facility shall comply with all of the following:
(1)Subdivision (b) of Section 66265.142 of Title 22 of the California Code of Regulations.
(2)The contingency plan as required in subparagraph (C) of paragraph (1) of subdivision (d).
(3)As applicable, Article 3 (commencing with Section 66265.30) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(4)Article 16 (commencing with Section 66265.370) of Chapter 15 of Division 4.5 of Title 22 of the California Code of Regulations.
(f)The owner or operator of a metal shredding facility shall provide notice to the department of an imminent or actual emergency situation, as required by Section 66265.56 of Title 22 of the California Code of Regulations.
(g)The owner or operator of a metal shredding facility shall provide written notice to the department at least 60 days before transferring ownership or operation of the facility.
(h)The owner or operator shall prevent the unknowing entry, and prevent unauthorized entry, of persons or livestock onto the active portion of the facility.
(i)For any new construction at a facility located in a 100-year floodplain or within the maximum high tide, the facility shall take all reasonable and feasible precautions to prevent washout of any hazardous materials.
(j)For any new construction at a facility, the facility shall take all reasonable and feasible precautions to withstand the maximum credible earthquake.
25095.13.The owner or operator of a metal shredding facility shall develop and comply with plans and minimum standards relating to each of the following aspects of the metal processing operation:
(a)The control of releases, including, but not limited to:
(1)Plans for complying with applicable local air quality management district or air pollution control district regulations and permit requirements, including the requirements of any approved emissions minimization plan or comparable plan required by applicable regulations.
(2)A housekeeping plan that is approved by the department and that does all of the following:
(A)Details all measures to control dispersal of metal shredder aggregate and its constituents, including light fibrous material, and metal shredder residue and constituents. Those measures shall include, but are not limited to, mechanical and manual sweeping, washing or cleaning of equipment and structures to remove accumulated debris, application of water using water trucks, sprinklers, spray bars, deluge systems or other dust suppression equipment, fencing, and enclosures.
(B)Specifies the frequency for each measure detailed pursuant to subparagraph (A).
(C)Addresses the disposition of residuals generated from cleaning, including, but not limited to, debris, sweepings, rinse water, and any other material that does not contain recoverable ferrous or nonferrous metal.
(D)Requires the completion of written logs of all housekeeping activities. The written logs shall be maintained in accordance with Section 25095.12.
(E)Requires the management of any light fibrous material that has been released from the facility to be subject to regulation under Chapter 6.5 (commencing with Section 25100).
(3)A metal shredding facility inspection plan that is approved by the department. The metal shredding facility inspection plan shall include all of the following:
(A)Inspection of all facilities and equipment that is used to manage metal shredder aggregate.
(B)A copy of a general inspection schedule that complies, with the specific requirements in Sections 66264.174, 66264.195, 66264.254, 66265.403, and 66264.1101 of Title 22 of the California Code of Regulations, and, as applicable, complies with the specific requirements in subdivision (i) of Section 66264.193, and Sections 66264.195, 66264.226, 66264.273, 66264.303, 66264.602, 66264.1033, 66264.1052, 66264.1053, 66264.1058, 66264.1084, 66264.1085, 66264.1086, 66265.1088, and 66264.1101 of Title 22 of the California Code of Regulations.
(C)All areas where the deposition of metal shredder aggregate, including light fibrous material and metal shredder residue may occur, including accessible areas within 500 feet of the metal shredding facilitys property boundary or further as determined by the department.
(4)An inventory management plan, that is approved by the department, to prevent accumulation of shredder feedstock and metal shredder aggregate and treated or untreated metal shredder residue in excess of the limitations set forth in subparagraph (E) of paragraph (2) of subdivision (b).
(5)Standards for the installation and maintenance of paving with concrete, steel plate, or other surfacing materials approved by the department that are designed to prevent infiltration and to collect and route water to a water management system. The paving shall be inspected quarterly and repaired as needed. The results of the paving inspections and any paving repairs shall be submitted to the department with the annual report and as requested by the department.
(b)(1)A separate written plan for the prevention, detection, and suppression of fires. The plan shall comply with all of the following:
(A)Be shared with local emergency responders.
(B)Be used to monitor metal shredding facility operations for evidence of incipient fire.
(C)Establish procedures for responding to fires of different duration and severity.
(D)Be activated in response to any incident at the metal shredding facility that falls within the scope of the plan.
(2)The plan shall include all of the following:
(A)Procedures for response to incipient fires and access to adequate water, water pressure, firefighting foam, and other supplies at the metal shredding facility that can be used in responding to an incipient or larger fire.
(B)Training of metal shredding facility personnel in the proper use of fire-response equipment and procedures and notification requirements.
(C)Coordination with local fire departments, the unified program agency, if other than the fire department, and other first responders as necessary to support maximum effectiveness in responding to an emergency at the metal shredding facility.
(D)Monitoring of temperatures on all feedstock and metal shredder aggregate piles, using an infrared camera or other equivalent equipment that continuously monitors the temperature of feedstock and aggregate piles and provides an alarm or other indication of temperature increases outside normal range.
(E)Inventory management provisions necessary to prevent the accumulation of feedstock or metal shredder aggregate at the facility in quantities that exceed the reasonable holding capacity of the facility and that cannot be processed within normal operating cycles, including typical periods of breakdown, maintenance, and repair. The following limits shall apply:
(i)No individual stockpile of feedstock shall exceed the amount of material that can be processed within a 24-hour period.
(ii)No individual pile of metal shredder aggregate shall exceed the amount of material that can be processed within a 48-hour period.
(iii)No individual pile of feedstock or metal shredder aggregate shall remain inactive for more than 48 hours except during periods when the facility is closed or not operating. Periods of breakdown, maintenance and repair, or under other circumstances specified in the facilitys approved inventory management plan, shall not be included in calculating the 48-hour period. A pile shall not be considered inactive if the majority of the material in the pile is removed over a period of 48 hours. In the event of an incident that is required to be reported to the department under Section 25095.31, the department may reduce the number of hours that a pile of feedstock or metal shredder aggregate may remain inactive until the owner or operator demonstrates to the satisfaction of the department and the local fire department that the risk of fire has been mitigated.
(iv)During any period of breakdown and associated repair that exceeds 72 hours, the feedstock and metal shredder aggregate piles shall be subject to additional controls as specified in the facilitys approved inventory management plan. Any shredder feedstock accepted by the facility during a period of breakdown, maintenance, or repair exceeding 72 hours shall be managed in accordance with the facilitys approved inventory management plan.
(v)All feedstock and metal shredder aggregate piles shall be subject to continuous 24-hour onsite surveillance, including when the facility is not operating, and such other additional controls specified in the facilitys approved fire response plan. All electronic surveillance data shall be maintained for a period of at least 14 days following any incident that is required to be reported to the department under Section 25095.31.
(F)Provisions for capture and management of fire suppression water as necessary to prevent discharge into storm drains or runoff into surface water.
(G)Requirement for at least one person to be present at the facility or on call at all times.
(3)The department, in coordination with the local fire department of the jurisdiction where the metal shredding facility is located, shall review a facilitys fire response plan on an annual basis and require the owner or operator to update the plan if necessary based on changes in technology or fire prevention practices, or the facilitys compliance history and history of fire, explosion, or release of hazardous waste or hazardous waste constituents.
(c)Stormwater management and control, including, but not limited to:
(1)Containment of stormwater in retention ponds, sumps, tanks, and associated piping or other engineered retention units to minimize free-standing water at the metal shredding facility.
(2)A stormwater testing plan to identify if stormwater exhibits any characteristics of toxicity as described in Section 66261.24 of Title 22 of the California Code of Regulations.
(3)Compliance with the metal shredding facilitys stormwater pollution prevention plan and spill prevention, control, and countermeasures plan.
(4)Discharge of stormwater in accordance with the general permit for discharges of stormwater associated with industrial activities or waste discharge requirements issued by a regional water quality control board, including sampling requirements.
25095.14.(a)Subject to subdivision (b), the owner or operator of a metal shredding facility may make the following physical or operational changes to the metal shredding facility without seeking prior approval from the department:
(1)Throughput increases and increases in maximum operating rate that are authorized or approved by an air quality management district or air pollution control district.
(2)Increases in efficiency of metal processing operations, including, without limitation, sizing, separation, sorting, removal, and recovery.
(3)Changes in design of processing equipment and conveyance systems.
(4)Changes in operations and methods of operation.
(5)Installation and modification of processing and other equipment and conveyance systems.
(6)Repair and replacement of processing and other equipment and conveyance systems.
(7)Decommissioning and removal of equipment and conveyance systems that are no longer in use.
(8)Construction of new structures and enclosures and changes to structures and enclosures.
(9)Installation and modification of abatement equipment and emission control systems.
(10)Installation of and modifications to water reuse and recycling systems.
(11)Installation of and repair to paving.
(12)Any other changes to the metal shredding facility unrelated to the storage or processing of metal shredder aggregate and metal shredder residue.
(b)Except as provided in subdivision (d), the changes described in subdivision (a) may be made without seeking prior approval from the department if the metal shredding facility maintains substantial compliance with this chapter and the owner or operator provides the department with written notice of these changes within 30 days of making the changes. The department shall post the notice on the section of its internet website that provides information regarding metal shredding facilities.
(c)The department shall evaluate the information provided in the notice from the facility pursuant to this subdivision, as well as any objections from the public, to assess whether the modification could result in a potentially significant impact on the environment. If the department determines that the modification could have a potentially significant impact on the environment, the owner or operator of the facility shall be required to implement changes to the modification as necessary to mitigate the impact to the extent feasible.
(d)The owner or operator of a metal shredding facility that proposes to modify the metal shredding facility in a manner that could result in a significant environmental impact from operations that were not considered by the department in reviewing the information submitted pursuant to this article shall provide the department with 60 days advance written notice of the modification and shall not implement the modification without approval from the department. The department shall provide notice of the proposed modification to the public and shall comply with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) in its review of the project.
(e)(1)On or before July 1 of each year, the owner or operator of a metal shredding facility shall submit an annual report to the department describing the material physical or operational changes, if any, made to the metal shredding facility during the previous calendar year relating to the management of metal shredder aggregate or metal shredder residue.
(2)Upon request by the department, the metal shredding facility shall be required to provide additional information about the nature or extent of changes described in the notice provided pursuant to subdivision (b) or the annual report as necessary to demonstrate the metal shredding facilitys ongoing compliance with applicable regulations.
(3)Physical changes to the metal shredding facilitys ongoing operations that are reported to the department in compliance with paragraph (1) may be reviewed and modified by the department as necessary to ensure compliance with the requirements of this chapter.
25095.15.(a)The owner or operator of a metal shredding facility shall manage all metal shredder aggregate during metal processing operations as necessary to achieve the following minimum standards:
(1)All outdoor equipment used for processing metal shredder aggregate shall be enclosed or covered and designed, operated, and maintained to minimize the possibility of the release of light fibrous material into the environment.
(2)All outdoor equipment used for the conveyance of metal shredder aggregate from one location within the metal shredding facility to another location within the metal shredding facility shall be enclosed or covered and designed, operated, and maintained to minimize the possibility of the release of light fibrous material into the environment.
(3)All vehicles used for the outdoor transfer of metal shredder aggregate shall be loaded and unloaded in a manner that minimizes the possibility of the release of metal shredder aggregate, including light fibrous material into the environment.
(b)Metal shredder aggregate shall be stored or accumulated inside a structure that protects the material from exposure to the elements and minimizes the possibility of the release of light fibrous material into the environment. At a minimum, the structure shall meet all of the following requirements:
(1)The structure shall be enclosed with a floor, roof, and walls sufficient to protect the metal shredder aggregate from exposure to the elements and to contain the metal shredder aggregate and any process residues that are managed in the structure.
(2)The roof shall completely cover all areas used for storage or accumulation of metal shredder aggregate.
(3)The floor shall be constructed of concrete surfacing, steel plate, or other surfacing material approved by the department designed to prevent infiltration and collect and route any water that drains from the metal shredder aggregate to a process water management system. The floor shall be inspected on a quarterly basis and repaired as needed. The results of the inspections and any repairs to the floor shall be included in the annual report submitted to the department pursuant to Section 25095.14.
(4)Any liquids that drain from materials stored inside the enclosure shall be collected and routed to the metal shredding facilitys recycled water management system.
(c)Trommel or augers shall be located in a building or otherwise covered or enclosed so as to minimize the possibility of releases.
(d)Subject to written approval by the department, stockpiling of metal shredder aggregate outside the confines of an enclosure required by subdivision (b) may be allowed for limited periods of time if all of the following conditions are met:
(1)The activity is necessary to accommodate unforeseen circumstances or operational disruptions that prevent the material from being stored inside an enclosure. These unforeseen circumstances or operational disruptions shall have been outside the reasonable control of the facility. The facility shall use best efforts to remedy any unforeseen circumstances or operational disruptions that necessitate outdoor stockpiling of metal shredder aggregate.
(2)The operator provides written notice to the department, the unified program agency, and the local fire department at least 24 hours before the need to store material outside arises.
(3)The operator conducts watering or other dust control measures to minimize the possibility of the release of light fibrous material from the stockpile into the environment.
(4)The outdoor stockpiling activity is conducted for 10 or fewer consecutive operating days.
(5)The outdoor stockpiling activity does not begin until approval is provided by the department. The department may rescind the temporary approval for outdoor stockpiling if the facility is not using best efforts to remedy any unforeseen circumstances or operational disruptions that necessitate outdoor stockpiling.
(e)The requirements of this section shall also apply to the management of untreated and treated metal shredder residue.
25095.16.(a)Metal shredder aggregate that is transported to an offsite metal shredding facility or metal recycling facility for purposes of processing shall be tarped or otherwise contained during shipment and transported in a manner that minimizes the possibility of release into the environment.
(b)The metal shredder aggregate shall be shipped directly to the offsite metal processing facility and shall not be handled at any interim location or held at any publicly accessible interim location for more than four hours unless required by hours of service or other applicable law or held by a rail transporter for reasons outside the control of the person arranging for transport.
(c)Each shipment of metal shredder aggregate by truck or rail shall be identified by a standard bill of lading or other shipping document that complies with applicable United States Department of Transportation requirements and that contains all of the following:
(1)The quantity, by weight, of metal shredder aggregate being transported.
(2)The name, physical and mailing addresses, and telephone number of the metal shredding facility that produced the metal shredder aggregate.
(3)The name, physical and mailing addresses, and telephone number of the metal processing facility that will process the metal shredder aggregate.
(4)The date the shipment of metal shredder aggregate leaves the originating metal shredding facility.
(5)The date the shipment of metal shredder aggregate is scheduled to arrive at the receiving metal processing facility.
(6)The name of the transporter that shipped the metal shredder aggregate from the originating metal shredding facility to the receiving metal processing facility.
(d)The originating metal shredding facility shall retain a copy of all shipping documents onsite, in either paper or electronic form, for a period of at least three years. The three-year record retention period may be extended at the direction of the department during the course of any unresolved enforcement action regarding the shipments.
(e)Transporters shall obtain and maintain liability insurance in accordance with Section 34631.5 of the Vehicle Code. A transporter shall cease to transport metal shredder aggregate upon loss of liability coverage.
(f)The owner or operator of the originating facility shall include in the annual report submitted to the department under Section 25095.14 the total tonnage of metal shredder aggregate that was shipped to another recycling facility for processing during the calendar year, the name of each transporter used for this purpose, the bill of lading numbers, and the total tonnage transported by that transporter during the calendar year, and the name and location of the facilities that processed the material. The department shall handle the information in a manner consistent with exceptions or exemptions under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
4.Classification of Materials25095.20.(a)If managed in accordance with this chapter, including any plans approved by the department and any additional conditions imposed by the department pursuant to Section 25095.10 or 25095.11, the following materials are not waste, as defined in Section 25124, and shall not be subject to regulation under Chapter 6.5 (commencing with Section 25100) of this division or Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations:
(1)Scrap metal.
(2)Metal shredder aggregate that is managed in either of the following ways:
(A)The metal shredder aggregate is stored and processed at the same metal shredding facility that produced the metal shredder aggregate.
(B)The metal shredder aggregate is transferred to another metal shredding facility or metal recycling facility within federal Standard Industrial Classification Code 5093 for the purpose of processing or further processing the metal shredder aggregate to separate and remove ferrous or nonferrous metals, subject to all of the following:
(i)Either one of the following:
(I)The receiving facility is located in the State of California and operates in accordance with the requirements of this chapter.
(II)The receiving facility is located in a state other than the State of California and is operated in accordance with the law of the state where the receiving facility is located.
(ii)Before transportation offsite, the metal shredder aggregate is managed in accordance with the requirements of the plan approved by the department under subparagraph (L) of paragraph (2) of subdivision (b) of Section 25095.10.
(iii)The receiving facility keeps records of the amount of ferrous and nonferrous metal recovered from the metal shredder aggregate and makes this information available to the department upon request.
(iv)The metal shredder aggregate is transported in accordance with the requirements of Section 25095.16.
(3)Intermediate metal products that are subject to further processing to improve product quality.
(4)Finished ferrous and nonferrous metal commodities that are separated or removed from metal shredder aggregate at a metal shredding facility.
(5)Nonmetallic recyclable items recovered from metal shredder aggregate for which a market exists.
(b)Notwithstanding subdivision (a) and any other provision of this chapter, metal shredder aggregate, including light fibrous material, that is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, shall be subject to regulation as hazardous waste under Chapter 6.5 (commencing with Section 25100) and Division 4.5 (commencing with Section 66250) of Title 22 of the California Code of Regulations, if it exhibits a characteristic of hazardous waste specified in those regulations.
25095.21.(a)Untreated metal shredder residue that meets the definition of a non-RCRA hazardous waste as defined in Section 66261.101 of Title 22 of the California Code of Regulations shall be chemically treated in accordance with this section or managed in accordance with all applicable requirements of Chapter 6.5 (commencing with Section 25100) and implementing regulations. Chemically treated metal shredder residue is not hazardous waste if all of the following conditions are met:
(1)Unless an alternative treatment recipe is approved by the department, untreated metal shredder residue shall be treated with at least 0.7 gallons of silicate solution per short ton of the untreated metal shredder residue and cement by weight equal to 8.5 percent of the weight of the untreated metal shredder residue.
(2)Metal shredding facilities shall document, on a weekly basis, how many tons of metal shredder residue was treated and how much silicate solution and cement were used in the treatment of the untreated metal shredder residue to comply with paragraph (1).
(3)The chemically treated metal shredder residue does not meet the definition of RCRA hazardous waste, as defined in Section 66261.100 of Title 22 of the California Code of Regulations.
(4)Immediately after waste stabilization, and at all times before offsite transportation and disposal, chemically treated metal shredder residue shall be managed in a manner that prevents releases of chemically treated metal shredder residue outside of a designated accumulation area. The designated accumulation area shall meet the requirements of either of the following:
(A)A self-supporting structure that meets all of the following requirements:
(i)The structure shall be fully or partially enclosed with a floor, at least three walls, and a roof to prevent exposure of the chemically treated metal shredder residue to the elements, including surface transport by precipitation runoff, contamination of soil and groundwater, and wind dispersal outside the enclosure.
(ii)The structure shall be constructed of man-made materials of sufficient strength and thickness to support themselves, the waste contents, any personnel and heavy equipment that operate within the unit, and the stresses of daily operation, such as the movement of personnel, wastes, and handling of equipment within the structure.
(iii)The designated accumulation area shall be labeled or marked clearly with the words Chemically Treated Metal Shredder Residue or CTMSR. The metal shredding facility shall comply with accumulation time limits as required in Section 66262.17 of Title 22 of the California Code of Regulations.
(B)A containment building that meets the requirements of either of the following:
(i)Article 29 (commencing with Section 66264.1100) of Chapter 14 of Title 22 of the California Code of Regulations.
(ii)Article 29 (commencing with Section 66265.1100) of Chapter 15 of Title 22 of the California Code of Regulations.
(b)Chemically treated metal shredder residue shall not be transported to, and shall not be disposed of at, any location other than one of the following:
(1)A composite-lined portion of a solid waste landfill unit that meets all requirements applicable to disposal of municipal solid waste in California after October 9, 1993, based on State Water Resources Control Board Resolution No. 93-62.
(2)A solid waste landfill or other facility that is regulated by waste discharge requirements issued pursuant to Division 7 (commencing with Section 13000) of the Water Code for discharges of designated waste, as defined in Section 13173 of the Water Code, or that allows for the discharge of chemically treated metal shredder residue. The discharge of chemically treated metal shredder residue includes its use as an alternative daily cover or for other beneficial reuse pursuant to Section 41781.3 of the Public Resources Code and the regulations adopted to implement that section.
(3)Any other landfill or location that is authorized by law to receive chemically treated metal shredder residue for disposal or beneficial use.
(c)The transporter of chemically treated metal shredder residue shall comply with all of the following conditions:
(1)Chemically treated metal shredder residue shall be contained and covered during shipment and transported in a manner that prevents any release into the environment.
(2)The transporter shall comply with all applicable United States Department of Transportation shipping requirements.
(3)The vehicle of railcar used to transport chemically treated metal shredder residue shall lack evidence of leakage, spillage, or damage that could cause releases under reasonably foreseeable conditions.
(4)The transporter of chemically treated metal shredder residue shall not transport chemically treated metal shredder residue to a place other than a landfill approved to receive chemically treated metal shredder residue, as described in subdivision (b).
(5)The chemically treated metal shredder residue is not held at any publicly accessible interim location for more than four hours, unless required by other provisions of law, before disposal.
(6)If an unauthorized release of chemically treated metal shredder residue occurs during transportation, the transporter shall immediately contain all releases of chemically treated metal shredder residue and residues from chemically treated metal shredder residue into the environment and determine whether any material resulting from that release is a hazardous waste and, if so, shall manage the hazardous waste in compliance with all applicable requirements of this division. The transporter of chemically treated metal shredder residue is considered the generator of any hazardous waste resulting from the release and is subject to the requirements of Chapter 12 (commencing with Section 66262.10) of Division 4.5 of Title 22 of the California Code of Regulations.
(d)Each shipment of chemically treated metal shredder residue shall be accompanied by a shipping document containing all of the following information:
(1)The quantity, by weight in short tons, of chemically treated metal shredder residue being transported.
(2)The name, physical and mailing addresses, and telephone number of the generating metal shredding facility.
(3)The name, physical and mailing addresses, and telephone number of the destination landfill.
(4)The date the shipment of chemically treated metal shredder residue leaves the metal shredding facility.
(5)The date the shipment of chemically treated metal shredder residue arrives at the destination landfill.
(6)The name and telephone number of the transporter who shipped the chemically treated metal shredder residue from the metal shredding facility to the destination landfill.
(e)The metal shredding facility shall retain onsite a copy of all documentation produced pursuant to this section for at least three years from the date that the chemically treated metal shredder residue that is the subject of the documentation was generated. The department may request the information identified in subdivision (d) in the form of a summary log or a copy of each individual shipping document. The three-year record retention period is automatically extended during the course of any unresolved enforcement action regarding chemically treated metal shredder residue management activity or as requested by the department.
(f)The generating metal shredding facility shall, on or before February 1 of the following year, submit to the department, at the address specified in subdivision (g) of this section, a written annual report containing all of the following information:
(1)The name, physical and mailing addresses, and telephone number of the generating metal shredding facility.
(2)The name, telephone number, and email address of the contact person at the generating metal shredding facility who should be contacted regarding management, transportation, and disposal of chemically treated metal shredder residue.
(3)The name, physical and mailing address, and telephone number for each of the landfills to which the generating metal shredding facility shipped chemically treated metal shredder residue during the previous calendar year.
(4)The total cumulative quantity of chemically treated metal shredder residue, by weight in short tons, shipped to all landfills, and the respective quantity of chemically treated metal shredder residue, by weight in short tons, shipped to each landfill, during the previous calendar year.
(5)The United States Environmental Protection Agency identification number of the generating metal shredding facility.
(g)The metal shredding facility shall provide a copy of any relevant document identified in subdivision (e) upon receipt of a request from the department. Annual reports submitted to the department pursuant to subdivision (f) shall be sent to the following address: Department of Toxic Substances Control, CTMSR Reporting Staff, P.O. Box 806, Sacramento, CA 95812-0806, with the words Attention: CTMSR Annual Report prominently displayed on the front of the envelope.
(h)The owner or operator of a metal shredding facility shall not be required to treat metal shredder residue and shall be exempt from this section if the owner or operator determines, as prescribed in Section 66262.11 of Title 22 of the California Code of Regulations, that the metal shredder residue generated at the facility does not exhibit any state or federal characteristics of hazardous waste, as prescribed in Chapter 11 (commencing with Section 66261.1) of Division 4.5 of Title 22 of the California Code of Regulations.
5.Reporting25095.30.(a)Except as otherwise provided in subdivision (c), within one year after the effective date, the owner or operator of a metal shredding facility shall conduct a preliminary endangerment assessment, as defined in Section 78095, and submit it to the department. The preliminary endangerment assessment shall be conducted in accordance with the most current department guidance manual for evaluating hazardous substance release sites and shall include an evaluation of process areas or locations where releases of materials containing hazardous constituents may have or have occurred, a conceptual site model, and site-specific human health and ecological screening evaluations.
(b)The owner or operator of a metal shredding facility shall conduct appropriate corrective action as needed to address releases of hazardous materials or wastes that pose a significant threat to human health or the environment. This subdivision does not prohibit the department from issuing a corrective action order under Section 25187 subsequent to any investigation of the metal shredding facility.
(c)The owner or operator of a metal shredding facility may demonstrate compliance with this section by providing evidence to the department that, within the last five years, the metal shredding facility has completed an assessment of the metal shredding facility pursuant to an order issued by the department, a regional water quality control board, or any other federal, state, or local agency and is implementing, or has implemented, any corrective action requirements imposed by the agency.
25095.31.(a)The owner or operator of a metal shredding facility shall provide the department with immediate notice of a fire or other incident at the metal shredding facility that requires the assistance of a local fire department or other first responder. This notice shall be in addition to any notice that is required to be made to the Office of Emergency Services pursuant to Section 66265.56 of Title 22 of the California Code of Regulations, the unified program agency, and any other agency under applicable law.
(b)The owner or operator of a metal shredding facility shall establish an effective means of providing public notice to members of the surrounding community upon the occurrence of a fire or other incident that poses a threat to human health or the environment outside of the facility as specified in Section 66265.56 of Title 22 of the California Code of Regulations.
(c)The department shall evaluate how to apply to metal shredding facilities its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations as described in subdivisions (b) and (c) of Section 25200.21.
25095.32.[RESERVED]
6.Closure25095.40.(a)The owner or operator of a metal shredding facility shall have a written closure plan.
(1)The written closure plan shall address all of the following:
(A)The closure and removal of all feedstock, metal shredder aggregate, and treated and untreated metal shredder residue.
(B)The decontamination of equipment and operating areas used for processing metal shredder aggregate.
(C)The treatment of metal shredder residue and management of chemically treated metal shredder residue.
(2)The written closure plan shall include all of the following:
(A)A description of how the equipment and areas used for processing metal shredder aggregate and for treating metal shredder residue will be closed. The description shall identify the maximum extent of the operation during the life of the equipment or area and how all of the following requirements will be met, if applicable:
(i)Section 66265.114 of Title 22 of the California Code of Regulations.
(ii)Subdivisions (a), (b), and paragraphs (1) and (2) of subdivision (c) of Section 66265.197 of Title 22 of the California Code of Regulations.
(iii)Section 66265.404 of Title 22 of the California Code of Regulations.
(B)An estimate of the maximum inventory of metal shredder aggregate and metal shredder residue in storage and in treatment at any time during the operation of the metal shredding facility.
(C)A description of the steps needed to remove or decontaminate an area, equipment, or structure during partial and final closure, including, but not limited to, procedures for cleaning equipment and removing contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required.
(D)An estimate of the expected year of closure and a schedule for final closure. The schedule for final closure shall include, at minimum, the total time required to close each authorized unit.
(3)The written closure plan shall be subject to approval by the department.
(4)An amendment to the written closure plan shall be done in compliance with subdivision (c) of Section 66265.112 of Title 22 of the California Code of Regulations.
(b)The metal shredder facility shall maintain compliance with both of the following requirements regarding closure:
(1)Subdivisions (a) and (b) of Section 66265.111 of Title 22 of the California Code of Regulations, in the same manner as those provisions apply to metal shredding facilities.
(2)Section 66265.114 of Title 22 of the California Code of Regulations.
(c)Within 90 days after processing the final volume of metal shredder aggregate, the owner or operator shall commence closure of the metal shredding facility in accordance with the written closure plan.
(d)The owner or operator shall complete closure activities in accordance with the written closure plan within 180 days after processing the final volume of metal shredder aggregate unless the owner or operator demonstrates to the department any of the following:
(1)The activities required to complete the closure will require longer than 180 days to complete.
(2)The facility has the capacity to process additional metal shredder aggregate.
(3)There is a reasonable likelihood that a person other than the owner or operator will recommence operation of a unit, the equipment or area, closure of the equipment and area would be incompatible with the operation of the metal shredding facility, and the owner or operator has taken and will continue to take all steps necessary to prevent threats to human health and the environment.
(e)The owner or operator shall notify the department and any other agencies having jurisdiction over the closure project at least 15 days before completion of closure.
(f)The owner or operator shall remain in compliance with all applicable requirements of this chapter until the owner or operator submits to the department or authorized agency a certification signed by the owner or operator and by an independent, professional engineer registered in California that closure has been completed in accordance with the written closure plan and that the written closure plan meets or exceeds the applicable requirements of this chapter.
25095.41.(a)The owner or operator shall provide a closure cost estimate to the department consistent with Section 66265.142 of Title 22 of the California Code of Regulations and based on all of the following factors:
(1)The cost of transporting any unprocessed metal shredder aggregate and metal shredder residue to another metal shredding facility for processing or disposal.
(2)The cost of decontaminating all areas and equipment used for storage and processing of metal shredder aggregate.
(3)The cost of decontaminating all areas and equipment used for treatment and storage of treated or untreated metal shredder residue.
(4)The cost for all closure sampling and analysis confirming decontamination sufficiently meets closure performance standards.
(5)The cost of disposition of the maximum amount of metal shredder aggregate and metal shredder residue that may be present at the metal shredding facility at the time of closure.
(6)The cost of closure certification.
(b)For the purpose of calculating the closure cost estimate, the owner or operator may apply the fair market value of any remaining feedstock and metal shredder aggregate against the estimated cost of closure. In addition, the owner or operator may take into consideration metal shredding facility structures, equipment, and other assets that may continue to be used, sold to third parties, or salvaged for scrap value. The closure cost estimate shall also be determined based on the site-specific aspects of the metal shredding facility, including, without limitation, those site-specific aspects specified in Section 25095.40.
(c)The owner or operator shall provide a financial assurance mechanism for closure of the metal shredding facility using one or more of the financial mechanisms described in Section 66265.143 of Title 22 of the California Code of Regulations.
(d)The owner or operator shall provide a financial assurance mechanism for bodily injury and property damage to third parties caused by sudden accidental occurrences arising from operations of the metal shredding facility. The owner or operator shall have and maintain liability coverage for sudden accidental occurrences in the amount of at least one million dollars ($1,000,000) per occurrence with an annual aggregate of at least two million dollars ($2,000,000), exclusive of legal defense costs. The owner or operator may satisfy the requirements of this subdivision through a financial mechanism identified in Section 66265.147 of Title 22 of the California Code of Regulations.
(e)If the facility is required to implement postclosure care following closure of the facility, the owner or operator shall provide a financial assurance mechanism for postclosure using one or more of the financial mechanisms described in Section 66265.145 of Title 22 of the California Code of Regulations.
7.Fees25095.50.(a)The following definitions shall apply for purposes of this article:
(1)Fee rate means the rate to be set by the department for the 202728 fiscal year, as annually adjusted by the Board of Environmental Safety beginning in the 202829 fiscal year and thereafter pursuant to subdivision (b).
(2)Fee schedule means the fee structure established in regulations by the department pursuant to subdivision (b) using the criteria in subdivision (c).
(b)(1)Beginning in the 202829 fiscal year, the rates established by the department shall be reviewed and shall be increased or decreased annually by the Board of Environmental Safety as necessary and shall provide for the assessment of no more than the reasonable and necessary costs of the department and the Office of Environmental Health Hazard Assessment to implement this chapter as described in this section.
(2)The department shall collect an annual fee on all metal shredding facilities that are subject to the requirements of this chapter. The department shall establish and adopt regulations to administer this fee and to establish a fee schedule and rate that is sufficient to cover the departments reasonable costs to implement this chapter and Sections 25150.87 and 41514.6, excluding the costs described in Section 25095.51.
(3)The fee rate shall include, but not be limited to, the costs of fee administration, the costs of collection of the fee, the departments administrative costs, and statewide general administrative costs related to implementation of this chapter and Sections 25150.87 and 41514.6.
(4)The fee rate shall allow for a reserve in the fund each year at an amount sufficient to ensure that all programs funded by the subaccount will not be adversely affected by revenue shortfalls or baseline expenditure adjustments and does not exceed 10 percent of the authorized expenditure levels.
(5)The fees established pursuant to this section shall also be sufficient to cover the Office of Environmental Health Hazard Assessments reasonable costs to implement Sections 25150.87 and 41514.6.
(c)In establishing fee schedule that may be imposed on a metal shredding facility pursuant to this section, the department shall consider all of the following factors as they relate to the departments reasonable oversight costs:
(1)The facility-specific permit conditions, if any, developed pursuant to paragraph (5) of subdivision (b) of Section 25095.10.
(2)The size of the facility.
(3)The volume of feedstock that is shredded on an annual basis.
(4)The types of feedstock that are shredded at the facility.
(5)The nature of metal processing operations occurring at the facility.
(6)Whether the facility conducts chemical stabilization of metal shredder residue.
(d)The Controller shall establish a new and separate Metal Shredding Facility Subaccount in the Hazardous Waste Control Account. The Metal Shredding Facility Subaccount shall be administered by the Director of Toxic Substances Control. The fees collected pursuant to this section shall be deposited into the Metal Shredding Facility Subaccount and be available for expenditure by the department and the Office of Environmental Health Hazard Assessment, upon appropriation by the Legislature, solely for the purpose of implementation and administration of this chapter and Sections 25150.87 and 41514.6. The Director of Finance, upon request of the Director of Toxic Substances Control, may make a loan from the General Fund to the Metal Shredding Facility Subaccount to meet cash needs. The loan shall be subject to the repayment provisions of Section 16351 of the Government Code and the interest provisions of Section 16314 of the Government Code.
(e)(1)A regulation adopted pursuant to this section may be adopted as an emergency regulation in accordance with Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, and, for purposes of that chapter, including Section 11349.6 of the Government Code, the adoption of these regulations is an emergency and shall be considered by the Office of Administrative Law as necessary for the immediate preservation of the public peace, health, safety, and general welfare. Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, an emergency regulation adopted by the department or the Board of Environmental Safety pursuant to this section shall be filed with, but not be repealed by, the Office of Administrative Law and shall remain in effect for a period of two years or until revised by the department or the Board of Environmental Safety, whichever occurs sooner.
(2)Before adopting a regulation pursuant to this section, the department shall hold at least two public hearings regarding the proposed regulation, including one public hearing dedicated to assessing the impact of the proposed regulation on small metal shredding facilities as defined in this chapter.
(f)(1)A metal shredding facility paying an annual fee in accordance with this section is not subject to any of the following fees set forth in Chapter 6.5 (commencing with Section 25100), with respect to the production, transportation, and processing of metal shredder aggregate, the generation, handling, and management, transportation, and disposal of nonhazardous metal shredder residue:
(A)A fee imposed pursuant to Section 25205.7.
(B)A facility fee imposed pursuant to Section 25205.2.
(C)A fee imposed pursuant to Section 25205.5.
(2)A metal shredding facility is subject to the fees listed in paragraph (1) for any hazardous waste generated and handled by the metal shredding facility that are ancillary to metal processing operations at the metal shredding facility.
25095.51.(a)(1)(A)A person who applies for a metal shredding facility permit under this chapter shall enter into a written agreement with the department pursuant to which that person shall reimburse the department for the direct costs reasonably incurred by the department in processing the permit application. The fee shall be sufficient to cover the departments review of the permit application, the conduct of public meetings and notices associated with the permit process, and preparation of the permit. The permit fee shall be established on the basis of the same factors listed in subdivision (b) of Section 25095.50.
(B)The fee shall be in addition to and separate from the annual fee assessed pursuant to Section 25095.50.
(2)An agreement required pursuant to paragraph (1) shall provide for a 25-percent deposit to be made with the submittal of the application. The 25-percent advance payment shall be based upon the departments total estimated costs of processing the application.
(b)(1)Pursuant to Section 21089 of the Public Resources Code, an applicant for a metal shredding facility permit shall also pay all costs incurred by the department for purposes of complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), in conjunction with the application.
(2)Paragraph (1) does not apply to projects that are exempt from CEQA.
(c)Funds received pursuant to this section shall be placed in the Metal Shredding Facility Subaccount specified in subdivision (d) of Section 25095.50 and be available for expenditure by the department, upon appropriation by the Legislature, solely for the purposes of implementation and administration of this chapter and Sections 25150.87 and 41514.6.
8.Enforcement25095.60.(a)The authority granted to the department in Article 8 (commencing with Section 25180) of Chapter 6.5 and implementing regulations set forth in Article 3 (commencing with Section 25095.10) of Chapter 22 of Division 4.5 of Title 22 California Code of Regulations may be used to enforce this chapter, including, but not limited to, the authority to conduct inspections and pursue administrative or judicial enforcement for violations of this chapter and any implementing regulations, to suspend the authorization of any metal shredding facility that has been determined based on substantial evidence to pose an imminent and substantial endangerment to human health or the environment, and to deny an application for a permit for any of the reasons set forth in paragraph (1) of subdivision (a) of Section 25095.61. These enforcement mechanisms shall apply to violations of this chapter relating to the management of materials listed in subdivision (a) of Sections 25095.20 and 25095.21.
(b)(1)The department may order the temporary cessation of shredder operations and may prohibit the receipt of additional shredder feedstock by the facility, if the owner or operator fails to develop and implement a fire response plan as required by paragraphs (1) and (2) of subdivision (b) of Section 25095.13. The owner or operator may resume shredder operations and receipt of feedstock immediately upon providing written confirmation to the department that the facility is operating in accordance with a fire response plan.
(2)The department may prohibit the receipt of shredder feedstock at a metal shredding facility on a temporary basis if the owner or operator exceeds the limitations relating to pile size and duration set forth in subparagraph (E) of paragraph (2) of subdivision (b) of Section 25095.13. So long as the owner or operator of the facility has developed and is implementing a fire response plan, the facility may continue to conduct metal shredding operations and metal processing operations to reduce the inventory of shredder feedstock or metal shredder aggregate, as appropriate, and may resume receipt of feedstock at the facility immediately upon providing written confirmation to the department compliance with the limitations on pile size and duration have been achieved.
(c)The department shall conduct an annual compliance evaluation inspection of each metal shredding facility regulated under this chapter. The unified program agency or local environmental health official shall be allowed to participate in the inspection.
25095.61.(a)(1)The department may deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility under this chapter. A denial, revocation, or suspension shall be based on at least one of the following:
(A)Noncompliance with a condition of the applicable permit that results in a significant threat to human health or the environment.
(B)An owner or operators failure in the application or during the approval process to disclose fully all relevant facts or a misrepresentation of any relevant fact at any time.
(C)A determination, supported by substantial evidence, that the permitted activity poses a danger to human health or the environment that can only be addressed by permit denial, modification, suspension, or revocation. In such situations, the department shall either deny, modify, suspend, or revoke a permit. Any modifications made by the department shall be consistent with and necessary to ensure compliance with the requirements of this chapter.
(D)Any cause specified in Section 25186.
(2)The department shall provide notice of any adverse action it proposes to be taken to the owner or operator of the metal shredding facility by certified mail with return receipt requested or by personal service.
(3)An owner or operator who wishes to appeal that adverse action shall appeal by submitting a letter to the department, within 10 days of receipt of notice of the adverse action and requesting a hearing.
(4)Except as provided in paragraph (5), proceedings to appeal any decision made by the department under this chapter, including without limitation required modifications to any plan or other information submitted pursuant to Section 25095.10 and the imposition of site-specific conditions or other operating requirements applicable to a metal shredding facility, shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code. Before initiating an appeal, the owner or operator of a facility shall meet and confer with the department in a good faith effort to resolve the dispute.
(5)Proceedings to appeal the departments decision concerning the denial, modification, revocation or suspension of a permit to operate a metal shredding facility pursuant to this chapter shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code.
(6)Any person who submitted written comments on the draft permit may file an appeal of the departments final permit decision with the Office of Administrative Hearings, pursuant to Chapter 5 (commencing with Section 11500) of Part I of Division 3 of Title 22 of the Government Code. An appeal filed pursuant to this paragraph shall be limited to those conditions of the final permit that were included in the persons written comments to the department during the public comment period.
(b)An authorization to operate pursuant to this chapter is contingent upon the accuracy of information contained in the notifications and other documents required to be maintained.
(c)(1)The department shall have primary responsibility for enforcement of the terms of this chapter and may refer violations of this chapter to a district attorney or the Attorney General for prosecution. Notwithstanding this authority, a city attorney, county counsel, district attorney, or the Attorney General may maintain a civil or criminal prosecution consistent with their authority. In addition, nothing in this chapter, and no action taken by the department pursuant to this chapter, shall be construed as a limitation on the right of any person to maintain any civil action otherwise authorized by law.
(2)The department shall inform the local health officer and the director of environmental health of a county, city, or district, and the unified program agency for the jurisdiction, of any unlawful disposal of materials that are regulated under Section 25095.20 or 25095.21 of this chapter, and of any enforcement action undertaken against a metal shredding facility within the unified program agencys jurisdiction as a result of that unlawful disposal. Notice shall be provided within 15 days after the department becomes aware of the violation, and the department shall coordinate with the unified program agency regarding the violation.
SEC. 2.Section 25117 of the Health and Safety Code is amended to read:25117.(a)Except as provided in subdivision (d), hazardous waste means a waste that meets any of the criteria for the identification of a hazardous waste adopted by the department pursuant to Section 25141.
(b)Hazardous waste includes, but is not limited to, RCRA hazardous waste.
(c)Unless expressly provided otherwise, hazardous waste also includes extremely hazardous waste and acutely hazardous waste.
(d)Hazardous waste does not include a material that is not waste pursuant to Section 25095.20 or hazardous waste pursuant to Section 25095.21.
(d)(e)Notwithstanding subdivision (a), in any criminal or civil prosecution brought by a city attorney, county counsel, district attorney, or the Attorney General for violation of this chapter, when it is an element of proof that the person knew or reasonably should have known of the violation, or violated the chapter willfully or with reckless disregard for the risk, or acted intentionally or negligently, the element of proof that the waste is hazardous waste may be satisfied by demonstrating that the waste exhibited the characteristics set forth in subdivision (b) of Section 25141.
SEC. 3.Section 25150.82 of the Health and Safety Code is repealed.25150.82.(a)The Legislature finds and declares that this section is intended to address the unique circumstances associated with the operation of metal shredding facilities, and the generation and management of wastes generated by metal shredding facilities. The Legislature further declares that this section does not set a precedent applicable to the management, including disposal, of other hazardous wastes.(b)For purposes of this section, metal shredding facility means an operation that uses a shredding technique to process end-of-life vehicles, appliances, and other forms of scrap metal to facilitate the separation and sorting of ferrous metals, nonferrous metals, and other recyclable materials from nonrecyclable materials that are components of the end-of-life vehicles, appliances, and other forms of scrap metal. Metal shredding facility does not include a feeder yard, a metal crusher, or a metal baler, if that facility does not otherwise conduct metal shredding operations.(c)The department, in consultation with the Department of Resources Recycling and Recovery, the State Water Resources Control Board, and affected local air quality management districts, may adopt regulations establishing management standards for metal shredding facilities for hazardous waste management activities within the departments jurisdiction as an alternative to the requirements specified in this chapter and the regulations adopted pursuant to this chapter, if the department does all of the following:(1)Prepares an analysis of the activities to which the alternative management standards will apply pursuant to subdivision (d). The department shall first prepare the analysis as a preliminary analysis and make it available to the public at the same time that the department gives notice, pursuant to Section 11346.4 of the Government Code, that it proposes to adopt the alternative management standards. The department shall include in the notice a statement that the department has prepared a preliminary analysis and a statement concerning where a copy of the preliminary analysis can be obtained. The information in the preliminary analysis shall be updated and the department shall make the analysis available to the public as a final analysis not less than 10 working days before the date that the regulation is adopted.(2)Demonstrates at least one of the conclusions set forth in paragraphs (1) to (4), inclusive, of subdivision (e).(3)Imposes, as may be necessary, conditions and limitations as part of the alternative management standards that ensure that the hazardous waste management activity to which the alternative management standards will apply will not pose a significant potential hazard to human health or safety or to the environment.(d)Before the department gives notice of a proposal to adopt the alternative management standards pursuant to subdivision (c), and before the department adopts the regulation, the department shall do all of the following:(1)Evaluate the operative environmental and public health regulatory oversight of metal shredding facilities, identifying activities that need to be addressed by the alternative management standards, or other advisable regulatory or statutory changes.(2)Evaluate the hazardous waste management activities.(3)Prepare, as required by paragraph (1) of subdivision (c), an analysis that addresses all of the following aspects of the activity, to the extent that the alternative management standards can affect these aspects of the activity:(A)The types of hazardous waste and the estimated amounts of each hazardous waste that are managed as part of the activity and the hazards to human health or safety or to the environment posed by reasonably foreseeable mismanagement of those hazardous wastes and their hazardous constituents. The estimate of the amounts of each hazardous waste that are managed as part of the activity shall be based upon information reasonably available to the department.(B)The complexity of the activity, and the amount and complexity of operator training, equipment installation and maintenance, and monitoring that are required to ensure that the activity is conducted in a manner that safely and effectively manages each hazardous waste.(C)The chemical or physical hazards that are associated with the activity and the degree to which those hazards are similar to, or different from, the chemical or physical hazards that are associated with the production processes that are carried out in the facilities that produce the hazardous waste that is managed as part of the activity.(D)The types of accidents that might reasonably be foreseen to occur during the management of particular types of hazardous waste streams as part of the activity, the likely consequences of those accidents, and the reasonably available actual accident history associated with the activity.(E)The types of locations where hazardous waste management activities associated with metal shredding and management of treated metal shredder waste may be carried out and the types of hazards or risks that may be posed by proximity to the land uses described in Section 25227. The estimate of the number of locations where the activity may be carried out shall be based upon information reasonably available to the department.(e)The department shall not give notice proposing the adoption of, and the department shall not adopt, a regulation pursuant to subdivision (c) unless it first demonstrates at least one of the following, using the information developed in the analysis prepared pursuant to subdivision (d) and any other information available to the department:(1)The requirements that the alternative management standards replace are not significant or important in either of the following situations:(A)Preventing or mitigating potential hazards to human health or safety or to the environment posed by the activity.(B)Ensuring that the activity is conducted in compliance with other applicable requirements of this chapter and the regulations adopted pursuant to this chapter.(2)A requirement is imposed and enforced by another public agency that provides protection of human health and safety and the environment that is as effective as, and equivalent to, the protection provided by the requirement, or requirements, that the alternative management standards replace.(3)Conditions or limitations imposed as part of the alternative management standards will provide protection of human health and safety and the environment equivalent to the requirement, or requirements, that the alternative management standards replace.(4)Conditions or limitations imposed as part of the alternative management standards accomplish the same regulatory purpose as the requirement, or requirements, that the alternative management standards replace, but at less cost or with greater administrative convenience, and without increasing potential risks to human health or safety or to the environment.(f)The department shall not adopt alternative management standards pursuant to this section if those standards are less stringent than the standards that would otherwise apply under the federal act.(g)Nothing in the alternative management standards authorized by this section is intended to duplicate or conflict with other laws, rules, or regulations adopted by other state agencies or affected local air quality management districts. The department shall, as much as possible, align the alternative management standards with the laws, rules, and regulations of other state agencies or affected local air quality management districts.(h)The owner or operator of a metal shredding facility, or solid waste disposal facility that has accepted treated metal shredder waste, that may be subject to the alternative management standards shall provide to the department all information and data determined by the department to be relevant to the evaluation and preparation of the analysis required by subparagraphs (A) to (E), inclusive, of paragraph (3) of subdivision (d).(i)The alternative management standards adopted by the department pursuant to this section may, to the extent it is consistent with the standards that would otherwise apply under the federal act, allow for treated metal shredder waste to be classified and managed as nonhazardous waste, provided that the analysis prepared pursuant to subdivision (d) demonstrates that classification and management as hazardous waste is not necessary to prevent or mitigate potential hazards to human health or safety or to the environment posed by the treated metal shredder waste.(j)(1)The disposal of treated metal shredder waste shall be regulated pursuant to this chapter and the regulations adopted pursuant to this chapter, unless alternative management standards are adopted by the department pursuant to this section.(2)If the alternative management standards adopted by the department pursuant to this section result in treated metal shredder waste being classified as nonhazardous waste, the material may be managed in either of the following manners:(A)It may be used at a unit described in subparagraph (B) as alternative daily cover or for beneficial reuse pursuant to Section 41781.3 of the Public Resources Code and the regulations adopted to implement that section.(B)It may be placed in a unit that meets the waste discharge requirements issued pursuant to Division 7 (commencing with Section 13000) of the Water Code that allow for discharges of designated waste, as defined in Section 13173 of the Water Code, or of treated metal shredder waste.(3)This section does not limit the disposal or use of treated metal shredder waste as alternative daily cover pursuant to Section 41781.3 of the Public Resources Code and the regulations adopted to implement that section, or for other authorized beneficial uses if that disposal or use is at a facility meeting the requirements of subparagraph (B) of paragraph (2), is made under the authority of the hazardous waste determinations governing metal shredder waste issued by the department before January 1, 2014, and is made before the department does either of the following:(A)Rescinds, in accordance with applicable law, the conditional nonhazardous waste classifications issued pursuant to subdivision (f) of Section 66260.200 of Title 22 of the California Code of Regulations with regard to treated metal shredder waste.(B)Completes the adoption of alternative management standards pursuant to this section.(k)The department shall complete the analysis described in paragraph (1) of subdivision (c) and subsequent regulatory action before January 1, 2018. All hazardous waste classifications and policies, procedures, or guidance issued by the department before January 1, 2014, governing or related to the generation, treatment, and management of metal shredder waste or treated metal shredder waste shall be inoperative and have no further effect on January 1, 2018, if the department completes its analysis pursuant to subdivision (c) and takes one of the following actions:(1)Rescinds the conditional nonhazardous waste classifications issued pursuant to subdivision (f) of Section 66260.200 of Title 22 of the California Code of Regulations with regard to that waste.(2)Adopts alternative management standards pursuant to this section.(l)The authority of the department to adopt original regulations pursuant to this section shall remain in effect only until January 1, 2018, unless a later enacted statute, which is enacted before January 1, 2018, deletes or extends that date. This subdivision does not invalidate any regulation adopted pursuant to this section before the expiration of the departments authority.(m)A regulation adopted pursuant to this section on or before January 1, 2018, shall continue in force and effect after that date, until repealed or revised by the department.SEC. 4.Section 25150.84 of the Health and Safety Code is repealed.25150.84.(a)The department shall collect an annual fee from all metal shredding facilities that are subject to the requirements of this chapter or to the alternative management standards adopted pursuant to Section 25150.82. The department shall establish and adopt regulations necessary to administer this fee and to establish a fee schedule that is set at a rate sufficient to reimburse the costs of the department and the Office of Environmental Health Hazard Assessment to implement this chapter and Section 41514.6, as applicable to metal shredding facilities. The fee schedule established by the department may be updated periodically as necessary and shall provide for the assessment of no more than the reasonable and necessary costs of the department and the Office of Environmental Health Hazard Assessment to implement this chapter and Section 41514.6, as applicable to metal shredding facilities.(b)The Controller shall establish a separate subaccount in the Hazardous Waste Control Account. The fees collected pursuant to this section shall be deposited into the subaccount and be available for expenditure by the department or Office of Environmental Health Hazard Assessment upon appropriation by the Legislature.(c)A regulation adopted pursuant to this section may be adopted as an emergency regulation in accordance with Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, and for the purposes of that chapter, including Section 11349.6 of the Government Code, the adoption of these regulations is an emergency and shall be considered by the Office of Administrative Law as necessary for the immediate preservation of the public peace, health, safety, and general welfare. Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, an emergency regulation adopted by the department pursuant to this section shall be filed with, but not be repealed by, the Office of Administrative Law and shall remain in effect for a period of two years or until revised by the department, whichever occurs sooner.(d)(1)A metal shredding facility paying an annual fee in accordance with this section shall be exempt from the following fees as the fees pertain to metal shredding activities and the generation, handling, management, transportation, and disposal of metal shredder waste:(A)A fee imposed pursuant to Section 25205.7.(B)A disposal fee imposed pursuant to Section 25174.1 until July 1, 2022.(C)A facility fee imposed pursuant to Section 25205.2.(D)A fee imposed pursuant to Section 25205.5.(E)A transportable treatment unit fee imposed pursuant to Section 25205.14 until July 1, 2022, and Section 25205.2 on and after July 1, 2022.(2)A metal shredding facility is not exempt from the fees listed in paragraph (1) for any other hazardous waste the metal shredding facility generates and handles.SEC. 5.Section 25150.86 of the Health and Safety Code is repealed.25150.86.Treated metal shredder waste that is managed in accordance with the alternative management standards adopted by the department pursuant to Section 25180.82 and that is accepted by a solid waste landfill or other authorized location for disposal or for use as alternative daily cover or other beneficial use shall thereafter be deemed to be a solid waste for purposes of this chapter and Section 40191 of the Public Resources Code. SEC. 6.Section 25150.87 of the Health and Safety Code is amended to read:25150.87.(a)(1)The department shall require metal shredding facilities facilities, as defined in Section 25095.1, that are subject to Section 41514.6 and this section, to do both of the following:
(A)Monitor hazardous waste constituents requested by the department.
(B)Report the results of the monitoring required pursuant to subparagraph (A) to the department. The facilities may also report those results to the local public health department.
(2)The department shall collect and analyze light fibrous material at the fence lines to determine the potential for release of hazardous waste.
(b)All metal shredding facilities subject to this section shall implement the facilitywide fence-line hazardous waste constituent monitoring requirements developed pursuant to this section.
(c)On or before July 1, 2027, the department shall develop a procedure for community notification of the public for the area in which the metal shredding facility is located, if monitoring pursuant to paragraph (1) of subdivision (a) indicates any release of light fibrous material.
(d)On or before January 1, 2027, the department shall develop regulations to implement, interpret, or make specific this section.
(e)The department shall oversee and enforce the implementation of subdivision (a) pursuant to Article 8 (commencing with Section 25180).
(f)Any reasonable regulatory costs incurred by the department in implementing this section may be reimbursed by the fee on metal shredding facilities imposed pursuant to subdivision (a) of Section 25150.84. 25095.50.
SEC. 7.Section 41514.6 of the Health and Safety Code is amended to read:41514.6.(a)On or before January 1, 2027, a district the jurisdiction of which includes metal shredding facilities, in consultation with the Department of Toxic Substances Control and the Office of Environmental Health Hazard Assessment, shall develop requirements for facilitywide fence-line air quality monitoring at metal shredding facilities, as defined in Section 25150.82, 25095.1, that are subject to Section 25150.84 25095.50 and this section.
(b)The requirements developed pursuant to subdivision (a) shall include, but not be limited to, all of the following:
(1)Development of threshold levels, in consultation with the Office of Environmental Health Hazard Assessment, for airborne contaminants, including, but not limited to, lead, zinc, cadmium, and nickel, at the fence lines of metal shredding facilities that are protective of air quality and public health. The threshold levels shall follow health guidance values adopted by the Office of Environmental Health Hazard Assessment, if available.
(2)Development of threshold levels for community notification of potential adverse impact on public health based on the threshold values developed pursuant to paragraph (1).
(3)Development of actions, in consultation with the Department of Toxic Substances Control, to be taken by metal shredding facilities if threshold levels developed pursuant to paragraph (1) are exceeded, and a method of enforcing those actions.
(4)Development of community notification procedures to inform the public in areas in which the metal shredding facility is located, if the monitoring required pursuant to this subdivision indicates the threshold levels developed pursuant to paragraph (2) were exceeded.
(5)Reporting the results of the monitoring required pursuant to this subdivision to the district and the local public health department.
(c)All metal shredding facilities subject to this section shall implement the facilitywide fence-line air quality monitoring developed pursuant to this section.
(d)On or before July 1, 2027, a district the jurisdiction of which includes metal shredding facilities shall adopt regulations to implement, interpret, or make specific the requirements pursuant to this section.
(e)A district the jurisdiction of which includes metal shredding facilities shall oversee and enforce the compliance of metal shredding facilities with regulations adopted pursuant to subdivision (d).
(f)Any reasonable regulatory costs incurred by a district in implementing this section may be reimbursed pursuant to its fee authority.
(g)The Office of Environmental Health Hazard Assessments costs to implement this section shall be reimbursed from the subaccount established in the Hazardous Waste Control Account pursuant to Section 25150.84. 25095.50.
SEC. 8.The Legislature finds and declares that metal shredding facilities are essential to a thriving circular economy in the State of California and the regulation of those facilities is a matter of statewide concern and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 1 of this act adding Chapter 6.4 (commencing with Section 25095) to Division 20 of the Health and Safety Code applies to all cities, including charter cities.
SEC. 9.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Section 4050 of the Civil Code is amended to read:4050.(a)This section governs the delivery of a document pursuant to this act.(b)If a document is delivered by mail, delivery is deemed to be complete upon deposit into the United States mail.(c)If a document is delivered by electronic means, delivery is complete at the time of transmission.(a)This section governs the delivery of a document pursuant to this act.
(b)If a document is delivered by mail, delivery is deemed to be complete on upon deposit into the United States mail.
(c)If a document is delivered by electronic means, delivery is complete at the time of transmission.
|
Date
|
Status
|
|---|---|
| Sep 30, 2026 | Chaptered by Secretary of State. Chapter 982, Statutes of 2026. |
| Sep 30, 2026 | Approved by the Governor. |
| Sep 8, 2026 | Enrolled and presented to the Governor at 4 p.m. |
| Aug 30, 2026 | Assembly amendments concurred in. (Ayes 35. Noes 1. Page 6114.) Ordered to engrossing and enrolling. |
| Aug 30, 2026 | Assembly amendments concurred in. (Ayes 35. Noes 1.) Ordered to engrossing and enrolling. |
| Aug 28, 2026 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 28, 2026 | Read third time. Passed. (Ayes 42. Noes 6. Page 6816.) Ordered to the Senate. |
| Aug 28, 2026 | Read third time. Passed. Ordered to the Senate. |
| Aug 17, 2026 | Read second time. Ordered to third reading. |
| Aug 13, 2026 | Read second time and amended. Ordered to second reading. |
| Aug 13, 2026 | From committee: Do pass as amended. (Ayes 10. Noes 1.) (August 13). |
| Aug 13, 2026 | Assembly Rule 63 suspended. |
| Aug 5, 2026 | August 5 set for first hearing. Placed on suspense file. |
| Jul 1, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 4. Noes 1.) (June 30). Re-referred to Com. on APPR. |
| Jun 25, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on E.S & T.M. |
| Jun 16, 2026 | June 16 set for first hearing canceled at the request of author. |
| May 4, 2026 | Referred to Com. on E.S & T.M. |
| Jan 27, 2026 | In Assembly. Read first time. Held at Desk. |
| Jan 27, 2026 | Read third time. Passed. (Ayes 40. Noes 0. Page 3302.) Ordered to the Assembly. |
| Jan 26, 2026 | Read second time. Ordered to third reading. |
| Jan 22, 2026 | Read second time and amended. Ordered to second reading. |
| Jan 22, 2026 | From committee: Do pass as amended. (Ayes 7. Noes 0. Page 3270.) (January 22). |
| Jan 21, 2026 | Set for hearing January 22. |
| Jan 20, 2026 | January 20 hearing: Placed on APPR. suspense file. |
| Jan 15, 2026 | Set for hearing January 20. |
| Jan 13, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 5. Noes 0. Page 3213.) (January 13). Re-referred to Com. on APPR. |
| Jan 7, 2026 | Set for hearing January 13. |
| Jan 5, 2026 | Re-referred to Com. on E.Q. |
| Jan 5, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Mar 12, 2025 | Referred to Com. on RLS. |
| Feb 24, 2025 | Read first time. |
| Feb 24, 2025 | From printer. May be acted upon on or after March 24. |
| Feb 21, 2025 | Introduced. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 30, 2026 | Unfinished Business SB811 Caballero et al. Concurrence | Senate Floor |
Passed |
|
| Aug 28, 2026 | SB 811 Caballero Senate Third Reading By Blanca Rubio | Assembly Floor |
Passed |
|
| Aug 13, 2026 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jun 30, 2026 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Environmental Safety and Toxic Materials |
Passed |
|
| Jan 27, 2026 | Senate 3rd Reading SB811 Caballero et al. | Senate Floor |
Passed |
|
| Jan 22, 2026 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| Jan 20, 2026 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jan 13, 2026 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Environmental Quality |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 1000 Grandmothers for Future Generations | ** Against | |
| 350 Bay Area Action | ** Against | |
| 350 Humboldt | ** Against | |
| Action Now | ** Against | |
| Active San Gabriel Valley | ** Against | |
| Alameda County District Attorney's Office | ** Against | |
| ALAMEDA; COUNTY OF | ** Against | |
| Alameda County Office Of Education | ** Against | |
| Antelope Valley Economic Development and Growth Enterprise | ** Against | |
| Asian Industry Business to Business | ** Against | |
| AV Edge (Antelope Valley Economic Development & Growth Enterprise) | ** Against | |
| Bay Area System Change Not Climate Change | ** Against | |
| Beacon House Association of San Pedro | ** Support | |
| Bizfed Central Valley | ** Against | |
| Boys & Girls Clubs of The Los Angeles Harbor | ** Support | |
| Business Council San Joaquin County | ** Against | |
| California African American Chamber Of Commerce | ** Against | |
| California Association of Environmental Health Administrators | ** Against | |
| California Coastkeeper Alliance | ** Against | |
| California Communities Against Toxics | ** Against | |
| California Council For Environmental & Economic Balance | ** Support | |
| California CUPA Forum | ** Against | |
| California Environmental Voters | ** Against | |
| California Hispanic Chambers Of Commerce | ** Support | |
| California Metal Recyclers Coalition | ** Support | |
| California Professional Firefighters | ** Support | |
| California Safe Schools | ** Against | |
| California Small Business Association | ** Against | |
| California State Association Of Electrical Workers | ** Support | |
| California State Pipe Trades Council | ** Support | |
| Center for Race, Poverty, and the Environment | ** Against | |
| Central City Association Of Los Angeles | ** Support | |
| Central Valley Business Federation | ** Against | |
| Clean Air Coalition of North Whittier and Avocado Heights | ** Against | |
| cleanearth4kids.org | ** Against | |
| Clean Water Action | ** Against | |
| C & M METALS INC | ** Against | |
| Coalition For Clean Air | ** Against | |
| Colton Chamber of Commerce | ** Support | |
| Comite Civico Del Valle | ** Against | |
| Comite Pro Uno | ** Against | |
| Communities for a Better Environment | ** Against | |
| County Of Alameda | ** Against | |
| County of San Mateo Board of Supervisors | ** Against | |
| CUPA Forum Board | ** Against | |
| Del Amo Action Committee | ** Against | |
| Earthjustice | ** Against | |
| East Yard Communities for Environmental Justice | ** Against | |
| Ecology Recycling Services | ** Support | |
| Facts: Families Advocating for Chemical & Toxics Safety | ** Against | |
| Fresnans Against Fracking | ** Against | |
| Garden Grove Chamber Of Commerce | ** Support | |
| Grand Vision Foundation | ** Support | |
| Greater Stockton Chamber of Commerce | ** Against | |
| Greenaction for Health and Environmental Justice | ** Against | |
| Harbor Association of Industry and Commerce | ** Support | |
| Health Officers Association Of California | ** Against | |
| kern county hispanic chamber of commerce | ** Support | |
| Kramar's Iron and Metal Co. | ** Against | |
| Kramar's Iron & Metal Co. | ** Against | |
| Latino Caucus Of California Counties | ** Support | |
| Lincoln Heights Community Coalition | ** Against | |
| Los Angeles Unified School District | ** Against | |
| Metal Recycling Coalition | ** Support | |
| Modesto Chamber of Commerce | ** Against | |
| National Federation Of Independent Business | ** Against | |
| National Resources Defense Council | ** Against | |
| Natural Resources Defense Council | ** Against | |
| New Genesis Housing Development Corporation | ** Against | |
| Oakland Athletics | ** Against | |
| OAKLAND; CITY OF | ** Against | |
| Oakland Unified School District | ** Against | |
| Pacific Auto Recycling Center | ** Against | |
| Peace Officers Research Association Of California | ** Support | |
| Philippine Action Group for the Environment | ** Against | |
| Phillipine Action Group for the Environment | ** Against | |
| Placer Earth Care Action | ** Against | |
| Port of Los Angeles | ** Support | |
| Recology | ** Support | |
| Redondo Beach Chamber of Commerce | ** Support | |
| Republic Services | ** Support | |
| Resource Recovery Coalition Of California | ** Support | |
| Resource Renewal Institute | ** Against | |
| Richmond Shoreline Alliance | ** Against | |
| San Bernardino County | ** Against | |
| San Francisco Baykeeper | ** Against | |
| San Joaquin County District Attorney's Office | ** Support | |
| San Joaquin County Sheriff - Public Administrator Patrick Withrow | ** Support | |
| Services Recycling, INC. | ** Against | |
| Sharefest Community Development | ** Support | |
| Sierra Club California | ** Against | |
| South Bay Association of Chambers of Commerce | ** Support | |
| South Colton Diversity Committee | ** Support | |
| State of California Auto Dismantlers Association, | ** Support | |
| State Of California Auto Dismantlers Association | ** Support | |
| Strength Based Community Change | ** Support | |
| Thousand Palms Chamber of Commerce | ** Support | |
| UNIVERSAL SERVICE RECYCLING, INC. | ** Against | |
| VALLEY INDUSTRY AND COMMERCE ASSOCIATION | ** Against | |
| West Berkeley Alliance for Clean Air and Safe Jobs | ** Against | |
| Western States Council Sheet Metal, Air, Rail And Transportation | ** Support | |
| West Oakland Environmental Indicators Project | ** Against |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 811 |
UNFINISHED BUSINESS
Bill No: SB 811
Author: Caballero (D), et al.
Amended: 8/13/26
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 5-0, 1/13/26
AYES: Blakespear, Valladares, Dahle, Pérez, Reyes
NO VOTE RECORDED: Gonzalez, Hurtado, Menjivar
SENATE APPROPRIATIONS COMMITTEE: 7-0, 1/22/26
AYES: Caballero, Seyarto, Cabaldon, Dahle, Grayson, Richardson, Wahab
SENATE FLOOR: 40-0, 1/27/26
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
ASSEMBLY FLOOR: 42-6, 8/28/26 - See last page for vote
SUBJECT: Hazardous materials: metal shredding facilities
SOURCE: California Metal Recyclers Coalition
DIGEST:
This bill requires the owner or operator of a metal shredding facility to obtain a permit from the Department of Toxic Substances Control (DTSC). Prohibits a metal shredding facility from operating in the state without a permit. Includes within the permit: requirements for managing various wastes within and leaving the facility, measures to prevent fires, and measures to reduce impacts to communities near the facility. Provides that local and state regulators retain enforcement authority with respect to metal shredding facilities, as that authority exists under current law.
Assembly Amendments
require DTSC to consider the size and nature of small metal shredding facilities, require the Board of Environmental Safety to hear from stakeholders, and stipulate fees on metal shredding facilities.
ANALYSIS:
Existing law:
- Defines a “metal shredding facility” as an operation that uses a shredding technique to process end-of-life vehicles, appliances, and other forms of scrap metal to help separate and sort ferrous metals, nonferrous metals, and other recyclable materials from non-recyclable materials.
- Allows DTSC in consultation with the Department of Resources Recycling and Recovery (CalRecycle), the State Water Resources Control Board (SWRCB), and local air districts to adopt regulations to set management standards for metal shredding facilities. These standards are used to regulate these facilities in lieu of standards set out in the Hazardous Waste Control Law (HWCL).
- Precludes DTSC from adopting management standards that are less stringent than standards set by federal law.
- Allows waste from a metal shredder (known as metal shredder residue or MSR) to be classified and managed as nonhazardous waste, provided certain standards are met. Such nonhazardous waste can be used as alternative daily cover or for beneficial reuse, or it may be disposed of if it complies with regulations in the Water Code.
- Allows DTSC to assess a fee on metal shredding facilities to cover the cost of the program.
- Deems treated MSR managed under the standards set in law as solid waste when it is accepted by a solid waste landfill or other authorized location for disposal or for use as alternative daily cover or other beneficial use.
This bill:
- Clarifies that this bill does not limit the authority of a local air pollution control district, air quality management district, Unified Program Agency, or a local environmental health department that is not a Unified Program Agency.
- Requires DTSC to determine, on the basis of substantial evidence, that operation of the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities, before approving or denying a permit under this bill.
- Requires DTSC to impose any additional facility-specific conditions that are necessary to ensure compliance with this bill and for the protection of human health and the environment.
- Requires the metal shredding facility, before they submit a permit application to DTSC, to hold at least one public meeting, approved by DTSC, to inform the community about the metal shredding facility and any potential impacts to nearby communities.
- Clarifies that metal shredder aggregate, including light fibrous material, that is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, shall be subject to regulation as hazardous waste under the state′s Hazardous Waste Control Law (HWCL).
- Requires the metal shredding facility to establish an effective means of providing public notice to members of the surrounding community upon the occurrence of a fire or other incident that poses a threat to human health or the environment outside of the facility.
- Clarifies that DTSC can use any authority it has under the HWCL to enforce the provisions of this bill.
- Authorizes DTSC to order the temporary shutdown of shredding operations or prohibit the receipt of shredder feedstock under certain circumstances.
- Authorizes DTSC to deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility based on at least one of the following:
- Noncompliance with a condition of the applicable permit that results in a significant threat to human health or the environment;
- An owner or operator′s failure in the application or during the approval process to disclose fully all relevant facts or a misrepresentation of any relevant fact at any time;
- A determination, supported by substantial evidence, that the permitted activity poses a danger to human health or the environment that can only be addressed by permit denial, modification, suspension, or revocation; or,
- Any cause specified in Health and Safety Code Section 25186 under the HWCL. (in short: this means a permit could be denied, suspended, etc., if the facility violates any one of the state and federal environmental laws and regulations listed in this referenced code section).
- Clarifies that an approval of an application for an existing or new metal shredding facility is subject to the provisions of the California Environmental Quality Act.
Background
- Metal shredder facilities. California law defines a "metal shredding facility" as an operation that uses a shredding technique to process end-of-life vehicles, appliances, and other forms of scrap metal to facilitate the separation and sorting of ferrous metals, nonferrous metals, and other recyclable materials from non-recyclable materials. A "metal shredding facility" does not include a feeder yard, a metal crusher, or a metal baler, if that facility does not otherwise conduct metal shredding operations. As such, most scrap metal recycling facilities would not be subject to any proposed regulations meant to manage the waste generated from metal shredding facilities.
Currently, there are ten metal shredding facilities operating in California. Seven of these are larger facilities, and 3 of them process a much smaller amount of metal. These facilities are located in the following cities: Anaheim, Bakersfield, Colton, Lancaster, Los Angeles, Oakland, Redwood City, Stockton, Sun Valley, and Vallejo.
- Metal shredder waste. The shredding of scrap metal (e.g., end-of-life vehicles) results in a mixture of recyclable materials (e.g., ferrous metals and nonferrous metals) and non-recyclable material (i.e., metal shredder waste). Aggregate is generated after the initial separation of ferrous metals and consists of nonferrous metals that can be further recovered and metal shredder waste. Metal shredder waste consists mainly of glass, fiber, rubber, automobile fluids, dirt, and plastics in automobiles and household appliances that remain after the recyclable metals have been removed. Because scrap metal contains regulated hazardous constituents, it can contaminate and ultimately cause metal shredder waste to exhibit a characteristic of hazardous waste for toxicity. In a 2002 draft report on auto shredder waste, DTSC showed that metal shredder waste often exceeded the soluble threshold limit concentrations for lead, cadmium, and zinc.
- Legislation to address impacts of metal shredding facilities. In 2014, Senator Jerry Hill introduced SB 1249 (Chapter 756), based in part on concerns about metal shredder safety due to recent fires at metal shredding facilities in his district, but also in response to historic concerns about metal shredding facilities and their potential impact on the environment. The intent of the bill was that the conditional nonhazardous waste classifications, as documented through the historical "f letters," be revoked and that metal shredding facilities be thoroughly evaluated and regulated to ensure adequate protection of human health and the environment. SB 1249 was signed by the Governor and authorized DTSC to develop alternative management standards (different from a hazardous waste facility permit) if, after a comprehensive evaluation of metal shredding facilities, DTSC determined that alternative management standards were warranted. DTSC completed the evaluation of metal shredding facilities; however DTSC did not develop alternative management standards for metal shredding facilities.
Comments
- Author’s statement. According to the author, “Metal shredding facilities recycle millions of end-of-life vehicles, household appliances, and other metallic items produced, used, and discarded annually in California. Unless recycled, these metal materials would rapidly overwhelm all available landfill capacity, creating a massive accumulation of damaged and abandoned cars, appliances, and other items.
“Metal shredding poses environmental concerns to surrounding communities because the shredding process has the potential to release particulate materials and has a risk of causing fire. The current framework for hazardous waste does not include metal shredding facilities and therefore the facilities are not required to obtain a permit and are not regulated by the California Department of Toxics and Substance Control (DTSC). Without a comprehensive regulatory framework, DTSC on their own has begun to regulate the industry on a facility-by-facility basis using a hazardous waste enforcement framework, creating an uncertain and inconsistent legal environment, which has resulted in litigation.
“SB 811 will resolve this uncertainty, end the litigation, and ensure comprehensive and robust oversight and enforcement of metal shredding facilities under DTSC′s authority. This bill will ensure that California remains a sustainability leader in "reducing, reusing and recycling" by fostering the recycling of scrap metal into new metal products, while at the same time protecting adjoining communities from environmental pollution.
“SB 811 includes provisions to address the governor′s veto message on SB 404."
- Recent legislation dealing with metal shredding facilities: In 2025, SB 404 (Caballero), which is nearly identical to SB 811, was vetoed by the Governor. In his veto message the Governor stated:
"I support the author′s intent to create a uniform structure for permitting metal shredding facilities in California. However, this bill lacks clear definitions regarding the materials processed at these facilities, including what "hazardous waste" requirements are applicable. Without this clarity, this bill is not as protective, places a significant burden on DTSC, and cannot be successfully implemented. I encourage the author to work closely with DTSC and interested parties to remedy this issue, as well as ensure that any future legislation requires metal shredding facilities operate, and be permitted to operate, in a health-protective manner."
According to the author of SB 811 and the sponsors of the bill, they did have conversations with DTSC and as a result have amended SB 811 to incorporate both technical changes and changes to further clarify that DTSC can exercise its enforcement authority under the HWCL for specific violations of SB 811.
SB 811 creates a regulatory structure in state law for metal shredding facilities. There are currently ten metal shredding facilities in the state, some operating under regulatory authorization from the 1980s and 1990s. These facilities are an important piece of the metal recycling infrastructure in California. However, having one clear regulatory structure for all metal shredding facilities in the state makes sense. Having clear rules will be helpful for state and local regulators and metal shredding facilities, and will help set the regulatory standard for future metal shredding facilities in the state.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee, if this bill were to be enacted, DTSC estimates ongoing costs of $1.6 million and six positions to cover its oversight, regulatory, and anticipated litigation costs. SB 811 requires all of DTSC′s costs to be reimbursed by an annual fee imposed on metal shredding facilities, as well as via a reimbursement agreement to cover the department′s direct costs related to processing permit applications.
SUPPORT: (Verified 8/26/26)
California Metal Recyclers Coalition (source)
Beacon House Association of San Pedro
Boys & Girls Clubs of the Los Angeles Harbor
California Council for Environmental & Economic Balance
California Hispanic Chambers of Commerce
California State Association of Electrical Workers
California State Pipe Trades Council
Central City Association of Los Angeles
City of Los Angeles Councilmember Tim Mcosker
Colton Chamber of Commerce
Councilmember John Echavarria
Ecology Recycling Services
Garden Grove Chamber of Commerce
Grand Vision Foundation
Harbor Association of Industry and Commerce
Kern County Hispanic Chamber of Commerce
Latino Caucus of California Counties
Metal Recycling Coalition
Port of Los Angeles
Recology
Redondo Beach Chamber of Commerce
Republic Services
Resource Recovery Coalition of California
San Joaquin County District Attorney's Office
San Joaquin County Sheriff - Public Administrator Patrick Withrow
Sharefest Community Development
South Bay Association of Chambers of Commerce
South Colton Diversity Committee
State of California Auto Dismantlers Association,
Strength Based Community Change
Thousand Palms Chamber of Commerce
Western States Council Sheet Metal, Air, Rail and Transportation
OPPOSITION: (Verified 8/26/26)
1000 Grandmothers for Future Generations
350 Bay Area Action
350 Humboldt
Action Now
Active San Gabriel Valley
Alameda County District Attorney's Office
Alameda County Office of Education
Alameda; County of
Av Edge (antelope Valley Economic Development & Growth Enterprise)
Bay Area System Change Not Climate Change
Bizfed Central Valley
California Coastkeeper Alliance
California Communities Against Toxics
California Environmental Voters
California Safe Schools
Center for Race, Poverty, and the Environment
Clean Air Coalition of North Whittier and Avocado Heights
Clean Water Action
Cleanearth4kids.org
C & M Metals INC
Coalition for Clean Air
Comite Civico Del Valle
Comite Pro Uno
Communities for a Better Environment
County of San Mateo Board of Supervisors
Del Amo Action Committee
Earthjustice
East Yard Communities for Environmental Justice
Facts: Families Advocating for Chemical & Toxics Safety
Fresnans Against Fracking
Greenaction for Health and Environmental Justice
Health Officers Association of California
Lincoln Heights Community Coalition
Los Angeles Unified School District
National Resources Defense Council
Natural Resources Defense Council
Natural Resources Defense Council
Oakland Athletics
Oakland Unified School District
Oakland; City of
Phillipine Action Group for the Environment
Placer Earth Care Action
Resource Renewal Institute
Richmond Shoreline Alliance
San Francisco Baykeeper
Sierra Club California
Valley Industry and Commerce Association
West Berkeley Alliance for Clean Air and Safe Jobs
West Oakland Environmental Indicators Project
ASSEMBLY FLOOR: 42-6, 8/28/26
AYES: Addis, Aguiar-Curry, Ahrens, Ávila Farías, Bains, Boerner, Calderon, Caloza, Carrillo, Chen, Connolly, Davies, Elhawary, Flora, Fong, Gipson, Mark González, Hadwick, Harabedian, Hoover, Irwin, Jackson, Kalra, Krell, Lowenthal, Ortega, Pacheco, Papan, Patterson, Petrie-Norris, Quirk-Silva, Ramos, Michelle Rodriguez, Blanca Rubio, Solache, Soria, Stefani, Valencia, Wallis, Wicks, Wilson, Rivas
NOES: Castillo, DeMaio, Ellis, Johnson, Muratsuchi, Sanchez
NO VOTE RECORDED: Alanis, Alvarez, Arambula, Bauer-Kahan, Bennett, Berman, Bonta, Bryan, Dixon, Gabriel, Garcia, Jeff Gonzalez, Haney, Hart, Lackey, Lee, Macedo, McKinnor, Nguyen, Patel, Pellerin, Ransom, Celeste Rodriguez, Rogers, Schiavo, Schultz, Sharp-Collins, Ta, Tangipa, Ward, Zbur
Prepared by: Heather Walters / E.Q. / (916) 651-4108
9/22/26 9:25:05
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 811 |
UNFINISHED BUSINESS
Bill No: SB 811
Author: Caballero (D), et al.
Amended: 8/13/26
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 5-0, 1/13/26
AYES: Blakespear, Valladares, Dahle, Pérez, Reyes
NO VOTE RECORDED: Gonzalez, Hurtado, Menjivar
SENATE APPROPRIATIONS COMMITTEE: 7-0, 1/22/26
AYES: Caballero, Seyarto, Cabaldon, Dahle, Grayson, Richardson, Wahab
SENATE FLOOR: 40-0, 1/27/26
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
ASSEMBLY FLOOR: Passed, 8/28/26
SUBJECT: Hazardous materials: metal shredding facilities
SOURCE: California Metal Recyclers Coalition
DIGEST:
This bill requires the owner or operator of a metal shredding facility to obtain a permit from the Department of Toxic Substances Control (DTSC). Prohibits a metal shredding facility from operating in the state without a permit. Includes within the permit: requirements for managing various wastes within and leaving the facility, measures to prevent fires, and measures to reduce impacts to communities near the facility. Provides that local and state regulators retain enforcement authority with respect to metal shredding facilities, as that authority exists under current law.
Assembly Amendments
require DTSC to consider the size and nature of small metal shredding facilities, require the Board of Environmental Safety to hear from stakeholders, and stipulate fees on metal shredding facilities.
ANALYSIS:
Existing law:
- Defines a “metal shredding facility” as an operation that uses a shredding technique to process end-of-life vehicles, appliances, and other forms of scrap metal to help separate and sort ferrous metals, nonferrous metals, and other recyclable materials from non-recyclable materials.
- Allows DTSC in consultation with the Department of Resources Recycling and Recovery (CalRecycle), the State Water Resources Control Board (SWRCB), and local air districts to adopt regulations to set management standards for metal shredding facilities. These standards are used to regulate these facilities in lieu of standards set out in the Hazardous Waste Control Law (HWCL).
- Precludes DTSC from adopting management standards that are less stringent than standards set by federal law.
- Allows waste from a metal shredder (known as metal shredder residue or MSR) to be classified and managed as nonhazardous waste, provided certain standards are met. Such nonhazardous waste can be used as alternative daily cover or for beneficial reuse, or it may be disposed of if it complies with regulations in the Water Code.
- Allows DTSC to assess a fee on metal shredding facilities to cover the cost of the program.
- Deems treated MSR managed under the standards set in law as solid waste when it is accepted by a solid waste landfill or other authorized location for disposal or for use as alternative daily cover or other beneficial use.
This bill:
- Clarifies that this bill does not limit the authority of a local air pollution control district, air quality management district, Unified Program Agency, or a local environmental health department that is not a Unified Program Agency.
- Requires DTSC to determine, on the basis of substantial evidence, that operation of the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities, before approving or denying a permit under this bill.
- Requires DTSC to impose any additional facility-specific conditions that are necessary to ensure compliance with this bill and for the protection of human health and the environment.
- Requires the metal shredding facility, before they submit a permit application to DTSC, to hold at least one public meeting, approved by DTSC, to inform the community about the metal shredding facility and any potential impacts to nearby communities.
- Clarifies that metal shredder aggregate, including light fibrous material, that is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, shall be subject to regulation as hazardous waste under the state′s Hazardous Waste Control Law (HWCL).
- Requires the metal shredding facility to establish an effective means of providing public notice to members of the surrounding community upon the occurrence of a fire or other incident that poses a threat to human health or the environment outside of the facility.
- Clarifies that DTSC can use any authority it has under the HWCL to enforce the provisions of this bill.
- Authorizes DTSC to order the temporary shutdown of shredding operations or prohibit the receipt of shredder feedstock under certain circumstances.
- Authorizes DTSC to deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility based on at least one of the following:
- Noncompliance with a condition of the applicable permit that results in a significant threat to human health or the environment;
- An owner or operator′s failure in the application or during the approval process to disclose fully all relevant facts or a misrepresentation of any relevant fact at any time;
- A determination, supported by substantial evidence, that the permitted activity poses a danger to human health or the environment that can only be addressed by permit denial, modification, suspension, or revocation; or,
- Any cause specified in Health and Safety Code Section 25186 under the HWCL. (in short: this means a permit could be denied, suspended, etc., if the facility violates any one of the state and federal environmental laws and regulations listed in this referenced code section).
- Clarifies that an approval of an application for an existing or new metal shredding facility is subject to the provisions of the California Environmental Quality Act.
Background
- Metal shredder facilities. California law defines a "metal shredding facility" as an operation that uses a shredding technique to process end-of-life vehicles, appliances, and other forms of scrap metal to facilitate the separation and sorting of ferrous metals, nonferrous metals, and other recyclable materials from non-recyclable materials. A "metal shredding facility" does not include a feeder yard, a metal crusher, or a metal baler, if that facility does not otherwise conduct metal shredding operations. As such, most scrap metal recycling facilities would not be subject to any proposed regulations meant to manage the waste generated from metal shredding facilities.
Currently, there are ten metal shredding facilities operating in California. Seven of these are larger facilities, and 3 of them process a much smaller amount of metal. These facilities are located in the following cities: Anaheim, Bakersfield, Colton, Lancaster, Los Angeles, Oakland, Redwood City, Stockton, Sun Valley, and Vallejo.
- Metal shredder waste. The shredding of scrap metal (e.g., end-of-life vehicles) results in a mixture of recyclable materials (e.g., ferrous metals and nonferrous metals) and non-recyclable material (i.e., metal shredder waste). Aggregate is generated after the initial separation of ferrous metals and consists of nonferrous metals that can be further recovered and metal shredder waste. Metal shredder waste consists mainly of glass, fiber, rubber, automobile fluids, dirt, and plastics in automobiles and household appliances that remain after the recyclable metals have been removed. Because scrap metal contains regulated hazardous constituents, it can contaminate and ultimately cause metal shredder waste to exhibit a characteristic of hazardous waste for toxicity. In a 2002 draft report on auto shredder waste, DTSC showed that metal shredder waste often exceeded the soluble threshold limit concentrations for lead, cadmium, and zinc.
- Legislation to address impacts of metal shredding facilities. In 2014, Senator Jerry Hill introduced SB 1249 (Chapter 756), based in part on concerns about metal shredder safety due to recent fires at metal shredding facilities in his district, but also in response to historic concerns about metal shredding facilities and their potential impact on the environment. The intent of the bill was that the conditional nonhazardous waste classifications, as documented through the historical "f letters," be revoked and that metal shredding facilities be thoroughly evaluated and regulated to ensure adequate protection of human health and the environment. SB 1249 was signed by the Governor and authorized DTSC to develop alternative management standards (different from a hazardous waste facility permit) if, after a comprehensive evaluation of metal shredding facilities, DTSC determined that alternative management standards were warranted. DTSC completed the evaluation of metal shredding facilities; however DTSC did not develop alternative management standards for metal shredding facilities.
Comments
- Author’s statement. According to the author, “Metal shredding facilities recycle millions of end-of-life vehicles, household appliances, and other metallic items produced, used, and discarded annually in California. Unless recycled, these metal materials would rapidly overwhelm all available landfill capacity, creating a massive accumulation of damaged and abandoned cars, appliances, and other items.
“Metal shredding poses environmental concerns to surrounding communities because the shredding process has the potential to release particulate materials and has a risk of causing fire. The current framework for hazardous waste does not include metal shredding facilities and therefore the facilities are not required to obtain a permit and are not regulated by the California Department of Toxics and Substance Control (DTSC). Without a comprehensive regulatory framework, DTSC on their own has begun to regulate the industry on a facility-by-facility basis using a hazardous waste enforcement framework, creating an uncertain and inconsistent legal environment, which has resulted in litigation.
“SB 811 will resolve this uncertainty, end the litigation, and ensure comprehensive and robust oversight and enforcement of metal shredding facilities under DTSC′s authority. This bill will ensure that California remains a sustainability leader in "reducing, reusing and recycling" by fostering the recycling of scrap metal into new metal products, while at the same time protecting adjoining communities from environmental pollution.
“SB 811 includes provisions to address the governor′s veto message on SB 404."
- Recent legislation dealing with metal shredding facilities: In 2025, SB 404 (Caballero), which is nearly identical to SB 811, was vetoed by the Governor. In his veto message the Governor stated:
"I support the author′s intent to create a uniform structure for permitting metal shredding facilities in California. However, this bill lacks clear definitions regarding the materials processed at these facilities, including what "hazardous waste" requirements are applicable. Without this clarity, this bill is not as protective, places a significant burden on DTSC, and cannot be successfully implemented. I encourage the author to work closely with DTSC and interested parties to remedy this issue, as well as ensure that any future legislation requires metal shredding facilities operate, and be permitted to operate, in a health-protective manner."
According to the author of SB 811 and the sponsors of the bill, they did have conversations with DTSC and as a result have amended SB 811 to incorporate both technical changes and changes to further clarify that DTSC can exercise its enforcement authority under the HWCL for specific violations of SB 811.
SB 811 creates a regulatory structure in state law for metal shredding facilities. There are currently ten metal shredding facilities in the state, some operating under regulatory authorization from the 1980s and 1990s. These facilities are an important piece of the metal recycling infrastructure in California. However, having one clear regulatory structure for all metal shredding facilities in the state makes sense. Having clear rules will be helpful for state and local regulators and metal shredding facilities, and will help set the regulatory standard for future metal shredding facilities in the state.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee, if this bill were to be enacted, DTSC estimates ongoing costs of $1.6 million and six positions to cover its oversight, regulatory, and anticipated litigation costs. SB 811 requires all of DTSC′s costs to be reimbursed by an annual fee imposed on metal shredding facilities, as well as via a reimbursement agreement to cover the department′s direct costs related to processing permit applications.
SUPPORT: (Verified 8/26/26)
California Metal Recyclers Coalition (source)
Beacon House Association of San Pedro
Boys & Girls Clubs of the Los Angeles Harbor
California Council for Environmental & Economic Balance
California Hispanic Chambers of Commerce
California State Association of Electrical Workers
California State Pipe Trades Council
Central City Association of Los Angeles
City of Los Angeles Councilmember Tim Mcosker
Colton Chamber of Commerce
Councilmember John Echavarria
Ecology Recycling Services
Garden Grove Chamber of Commerce
Grand Vision Foundation
Harbor Association of Industry and Commerce
Kern County Hispanic Chamber of Commerce
Latino Caucus of California Counties
Metal Recycling Coalition
Port of Los Angeles
Recology
Redondo Beach Chamber of Commerce
Republic Services
Resource Recovery Coalition of California
San Joaquin County District Attorney's Office
San Joaquin County Sheriff - Public Administrator Patrick Withrow
Sharefest Community Development
South Bay Association of Chambers of Commerce
South Colton Diversity Committee
State of California Auto Dismantlers Association,
Strength Based Community Change
Thousand Palms Chamber of Commerce
Western States Council Sheet Metal, Air, Rail and Transportation
OPPOSITION: (Verified 8/26/26)
1000 Grandmothers for Future Generations
350 Bay Area Action
350 Humboldt
Action Now
Active San Gabriel Valley
Alameda County District Attorney's Office
Alameda County Office of Education
Alameda; County of
Av Edge (antelope Valley Economic Development & Growth Enterprise)
Bay Area System Change Not Climate Change
Bizfed Central Valley
California Coastkeeper Alliance
California Communities Against Toxics
California Environmental Voters
California Safe Schools
Center for Race, Poverty, and the Environment
Clean Air Coalition of North Whittier and Avocado Heights
Clean Water Action
Cleanearth4kids.org
C & M Metals INC
Coalition for Clean Air
Comite Civico Del Valle
Comite Pro Uno
Communities for a Better Environment
County of San Mateo Board of Supervisors
Del Amo Action Committee
Earthjustice
East Yard Communities for Environmental Justice
Facts: Families Advocating for Chemical & Toxics Safety
Fresnans Against Fracking
Greenaction for Health and Environmental Justice
Health Officers Association of California
Lincoln Heights Community Coalition
Los Angeles Unified School District
National Resources Defense Council
Natural Resources Defense Council
Natural Resources Defense Council
Oakland Athletics
Oakland Unified School District
Oakland; City of
Phillipine Action Group for the Environment
Placer Earth Care Action
Resource Renewal Institute
Richmond Shoreline Alliance
San Francisco Baykeeper
Sierra Club California
Valley Industry and Commerce Association
West Berkeley Alliance for Clean Air and Safe Jobs
West Oakland Environmental Indicators Project
Prepared by: Heather Walters / E.Q. / (916) 651-4108
8/28/26 12:02:49
**** END ****
SENATE THIRD READING
STR Bill Id:SB 811
Author:(Caballero)
As Amended Ver:August 13, 2026
Majority vote
SUMMARY
Requires the owner or operator of a metal shredding facility to obtain a permit from the Department of Toxic Substances Control (DTSC). Prohibits a metal shredding facility from operating in the state without a permit. Includes within the permit: requirements for managing various wastes within and leaving the facility, measures to prevent fires, and measures to reduce impacts to communities near the facility. Provides that local and state regulators retain enforcement authority with respect to metal shredding facilities, as that authority exists under current law.
Major Provisions
- Clarifies that this bill does not limit the authority of a local air pollution control district, air quality management district, Unified Program Agency, or a local environmental health department that is not a Unified Program Agency.
- Requires DTSC to determine, on the basis of substantial evidence, that operation of the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities, before approving or denying a permit under this bill.
- Requires DTSC to impose any additional facility-specific conditions that are necessary to ensure compliance with this bill and for the protection of human health and the environment.
- Requires the metal shredding facility, before they submit a permit application to DTSC, to hold at least one public meeting, approved by DTSC, to inform the community about the metal shredding facility and any potential impacts to nearby communities.
- Clarifies that metal shredder aggregate, including light fibrous material, that is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, shall be subject to regulation as hazardous waste under the state′s Hazardous Waste Control Law (HWCL).
- Requires the metal shredding facility to establish an effective means of providing public notice to members of the surrounding community upon the occurrence of a fire or other incident that poses a threat to human health or the environment outside of the facility.
- Clarifies that DTSC can use any authority it has under the HWCL to enforce the provisions of this bill.
- Authorizes DTSC to order the temporary shutdown of shredding operations or prohibit the receipt of shredder feedstock under certain circumstances.
- Authorizes DTSC to deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility based on at least one of the following:
- Noncompliance with a condition of the applicable permit that results in a significant threat to human health or the environment;
- An owner or operator′s failure in the application or during the approval process to disclose fully all relevant facts or a misrepresentation of any relevant fact at any time;
- A determination, supported by substantial evidence, that the permitted activity poses a danger to human health or the environment that can only be addressed by permit denial, modification, suspension, or revocation; or,
- Any cause specified in Health and Safety Code Section 25186 under the HWCL. (in short: this means a permit could be denied, suspended, etc., if the facility violates any one of the state and federal environmental laws and regulations listed in this referenced code section).
- Clarifies that an approval of an application for an existing or new metal shredding facility is subject to the provisions of the California Environmental Quality Act.
COMMENTS
Metal shredder facilities: California law defines a "metal shredding facility" as an operation that uses a shredding technique to process end-of-life vehicles, appliances, and other forms of scrap metal to facilitate the separation and sorting of ferrous metals, nonferrous metals, and other recyclable materials from non-recyclable materials. A "metal shredding facility" does not include a feeder yard, a metal crusher, or a metal baler, if that facility does not otherwise conduct metal shredding operations. As such, most scrap metal recycling facilities would not be subject to any proposed regulations meant to manage the waste generated from metal shredding facilities.
Currently, there are ten metal shredding facilities operating in California. Seven of these are larger facilities, and 3 of them process a much smaller amount of metal. These facilities are located in the following cities: Anaheim, Bakersfield, Colton, Lancaster, Los Angeles, Oakland, Redwood City, Stockton, Sun Valley, and Vallejo.
Metal shredder waste: The shredding of scrap metal (e.g., end-of-life vehicles) results in a mixture of recyclable materials (e.g., ferrous metals and nonferrous metals) and non-recyclable material (i.e., metal shredder waste). Aggregate is generated after the initial separation of ferrous metals and consists of nonferrous metals that can be further recovered and metal shredder waste. Metal shredder waste consists mainly of glass, fiber, rubber, automobile fluids, dirt, and plastics in automobiles and household appliances that remain after the recyclable metals have been removed. Because scrap metal contains regulated hazardous constituents, it can contaminate and ultimately cause metal shredder waste to exhibit a characteristic of hazardous waste for toxicity. In a 2002 draft report on auto shredder waste, DTSC showed that metal shredder waste often exceeded the soluble threshold limit concentrations for lead, cadmium, and zinc.
Legislation to address impacts of metal shredding facilities: In 2014, Senator Jerry Hill introduced SB 1249 (Chapter 756), based in part on concerns about metal shredder safety due to recent fires at metal shredding facilities in his district, but also in response to historic concerns about metal shredding facilities and their potential impact on the environment. The intent of the bill was that the conditional nonhazardous waste classifications, as documented through the historical "f letters," be revoked and that metal shredding facilities be thoroughly evaluated and regulated to ensure adequate protection of human health and the environment. SB 1249 was signed by the Governor and authorized DTSC to develop alternative management standards (different from a hazardous waste facility permit) if, after a comprehensive evaluation of metal shredding facilities, DTSC determined that alternative management standards were warranted. DTSC completed the evaluation of metal shredding facilities; however DTSC did not develop alternative management standards for metal shredding facilities.
Recent legislation dealing with metal shredding facilities: In 2025, SB 404 (Caballero), which is nearly identical to SB 811, was vetoed by the Governor. In his veto message the Governor stated:
"I support the author′s intent to create a uniform structure for permitting metal shredding facilities in California. However, this bill lacks clear definitions regarding the materials processed at these facilities, including what "hazardous waste" requirements are applicable. Without this clarity, this bill is not as protective, places a significant burden on DTSC, and cannot be successfully implemented. I encourage the author to work closely with DTSC and interested parties to remedy this issue, as well as ensure that any future legislation requires metal shredding facilities operate, and be permitted to operate, in a health-protective manner."
According to the author of SB 811 and the sponsors of the bill, they did have conversations with DTSC and as a result have amended SB 811 to incorporate both technical changes and changes to further clarify that DTSC can exercise its enforcement authority under the HWCL for specific violations of SB 811.
This bill: SB 811 creates a regulatory structure in state law for metal shredding facilities. There are currently ten metal shredding facilities in the state, some operating under regulatory authorization from the 1980s and 1990s. These facilities are an important piece of the metal recycling infrastructure in California. However, having one clear regulatory structure for all metal shredding facilities in the state makes sense. Having clear rules will be helpful for state and local regulators and metal shredding facilities, and will help set the regulatory standard for future metal shredding facilities in the state.
According to the Author
"Metal shredding facilities recycle millions of end-of-life vehicles, household appliances, and other metallic items produced, used, and discarded annually in California. Unless recycled, these metal materials would rapidly overwhelm all available landfill capacity, creating a massive accumulation of damaged and abandoned cars, appliances, and other items.
Metal shredding poses environmental concerns to surrounding communities because the shredding process has the potential to release particulate materials and has a risk of causing fire. The current framework for hazardous waste does not include metal shredding facilities and therefore the facilities are not required to obtain a permit and are not regulated by the California Department of Toxics and Substance Control (DTSC). Without a comprehensive regulatory framework, DTSC on their own has begun to regulate the industry on a facility-by-facility basis using a hazardous waste enforcement framework, creating an uncertain and inconsistent legal environment, which has resulted in litigation.
SB 811 will resolve this uncertainty, end the litigation, and ensure comprehensive and robust oversight and enforcement of metal shredding facilities under DTSC′s authority. This bill will ensure that California remains a sustainability leader in "reducing, reusing and recycling" by fostering the recycling of scrap metal into new metal products, while at the same time protecting adjoining communities from environmental pollution.
SB 811 includes provisions to address the governor′s veto message on SB 404."
Arguments in Support
According to the California Metal Recyclers Coalition:
"Metal shredding facilities provide an essential public service to many sectors of the economy, including state and municipal governments, California businesses and residents by providing a safe, reliable and environmentally responsible means of recycling the vast quantities of recyclable metal-containing materials that are generated in the state every day. These facilities successfully recycle millions of end-of-life vehicles, trucks, busses, household appliances, steel beams, rebar and other metallic construction materials, and thousands of other items ranging in size from a backyard barbeque to sections of the old San Francisco-Oakland Bay Bridge. More than ever, these facilities provide the only feasible and cost-effective means of dealing with the huge number of burned vehicles, household appliances and other metal items that are damaged or destroyed by the wildfires which are sweeping though our communities with distressing frequency.
SB 811 is virtually identical to SB 404 (Caballero), which was passed by the Legislature last year with only one ′no′ vote. Unfortunately, the Governor vetoed the bill due to an implementation issue that could not be resolved prior to passage due to time constraints. However, the Governor′s veto message expressed his desire that this issue be resolved so that a new bill could be signed to ensure that these critical facilities may continue to operate in California.
SB 811 accomplishes this goal. SB 811 is identical to SB 404 with the exception of very minor amendments that resolve the implementation issues referred to in the Governor′s veto message. These amendments make clear that the requirements of the bill apply to both the metal processing operations and the materials processed by those operations, and that DTSC retains authority under the Hazardous Waste Control Law to pursue enforcement against metal shredding facilities in certain prescribed circumstances. The Metal Recyclers Coalition worked with the Department of Toxic Substances Control (DTSC) to ensure that the proposed amendments are clear and achieve the necessary clarifications of the bill′s language.
SB 811 solves a problem that has threatened the economic viability of metal shredding facilities for almost a decade—the lack of clarity around how these critical facilities should be regulated. In the same fashion as SB 404, SB 811 would establish a new regulatory program in the Health and Safety Code devoted specifically to this industry, that would be administered by DTSC. The industry has worked proactively with DTSC to address issues raised by the agency and to ensure the safe operation of these facilities. Significant operational improvements have been achieved at metal shredding facilities over the past few years, and the regulatory framework established by SB 811 will further ensure that these important facilities continue to operate safely and in an environmentally protective manner."
Arguments in Opposition
According to a coalition of environmental and environmental justice organizations:
"The undersigned organizations respectfully oppose Senate Bill 811 by Senator Caballero. The bill′s effort to exclude metal shredders from California′s hazardous waste laws while providing an inadequate replacement puts communities and the environment at risk. Our organizations raised our concerns in opposition to SB 404, which was vetoed last session but has been revived as SB 811. Despite the minor amendments from SB 404, this bill still fails to address significant concerns and should be rejected.
The materials managed at metal shredding facilities are hazardous waste and must be regulated as such under California′s hazardous waste laws. Instead of SB 811′s overly complicated approach, California should regulate metal shredding facilities under the existing hazardous waste framework, including by promptly requiring the facilities to obtain hazardous waste permits with conditions necessary to protect human health and the environment. The Department of Toxic Substances Control (DTSC) should then be directed to develop additional requirements, within the existing hazardous waste legal framework, tailored to address the ongoing problems we′ve seen at metal shredding facilities—including fires and dispersal of heavy metals into surrounding communities.
DTSC already struggles to manage its existing regulatory responsibilities. Carving metal shredding facilities out of the hazardous waste framework to create a separate permitting regime for the metal shredding industry will stretch DTSC even thinner and needlessly tax its capacity to implement the hazardous waste program. The focus instead should be on ensuring DTSC is providing regulatory oversight and ensuring protection of human health and the environment.
We agree with the need to address the threats posed by metal shredding facilities to communities, but this bill as written moves in the wrong direction."
According to Universal Service Recycling, Inc. (Universal), Pacific Auto Recycling Center (PARC), and Kramar′s Iron & Metal Co. (Kramar):
"Universal Service Recycling, Inc. (Universal), Pacific Auto Recycling Center (PARC), and Kramar′s Iron & Metal Co. (Kramar), three small businesses that have shredded and recycled metals in California for decades, are regrettably opposed to SB 811 unless it is amended to eliminate the duplicative, overly burdensome, and costly requirements it would impose on our businesses.
As the bill correctly observes, metal shredding and recycling is a critical circular economy and environmental protection measure in California. Small metal recyclers like Universal, PARC, and Kramar assist in the statewide recovery of valuable secondary metals, separating and bundling them into compact and transportable bales that can be sold as raw materials for manufacturing new metal products, such as rebar. These companies also play an important role in the cleanup process that follows natural disasters, such as the catastrophic wildfires that impacted Los Angeles communities earlier this year and also support local economies in disadvantaged communities for the many jobbers who collect and sell scrap metal.
Since small metal recyclers do not chemically treat metal shredder residue (MSR), they are already regulated by the Department of Toxic Substances Control (DTSC), and all their generation and handling of MSR must comply with hazardous waste generator requirements found in Title 22 of the California Code of Regulations.
Accordingly, we request that SB 811 be amended to clearly distinguish between the two pathways for proper regulation of metal shredder residue. Under our proposed amendments, the small metal recyclers that do not chemically treat metal shredder residue and that have obtained all necessary permits and authorizations from the myriad agencies with jurisdiction over different facets of metal shredding operations, would continue to be regulated by DTSC under DTSC′s own hazardous waste generator regulations. As such, these facilities would not need to obtain the permit contemplated in SB 811. The SB 811 permitting process would be the primary means of authorizing and regulating the chemical treatment of metal shredder residue and would also serve as the backstop for facilities that do not have all the necessary regulatory mechanisms in place."
According to California Association of Environmental Health Administrators (CAEHA), the CUPA Forum Board (CFB), and the Health Officers Association of California, writing in an opposed-unless-amended position:
"SB 811 codifies metal shredder residue and chemically treated metal shredder residue as non-hazardous waste. DTSC′s analytical results released in 2021 clearly demonstrate that metal shredder residues remain hazardous waste even after treatment. The public′s health is endangered when we ignore the hazardous nature of residue which is produced by locations often located in close proximity to low-income communities.
Emergencies start and end locally. California communities are burdened by fires at metal shredding facilities (including a recent fire at Radius Recycling′s Oakland′s facility on March 11, 2026) which release hazardous waste constituents into the local community, endangering the public′s health. SB 811 creates an exemption that allows the industry to treat hazardous waste without meaningful local oversight.
SB 811 sets an unwise precedent for using code to exempt a specific waste product from the hazardous waste regulatory process. Statutory provisions for the establishment of alternative management standards for metal shredder waste were enacted in 2014 (SB 1249, Chapter 756) and amended in 2025 (AB 2851, chapter 743). The Department of Toxic Substances Control (DTSC) was provided with the opportunity to adopt regulations but chose not to, instead issuing an interpretive letter, which was recently rescinded."
FISCAL COMMENTS
According to the Assembly Appropriations Committee, if this bill were to be enacted, DTSC estimates ongoing costs of $1.6 million and six positions to cover its oversight, regulatory, and anticipated litigation costs. SB 811 requires all of DTSC′s costs to be reimbursed by an annual fee imposed on metal shredding facilities, as well as via a reimbursement agreement to cover the department′s direct costs related to processing permit applications.
VOTES
SENATE FLOOR: 40-0-0
YES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
ASM ENVIRONMENTAL SAFETY AND TOXIC MATERIALS: 4-1-2
YES: Connolly, Lee, McKinnor, Papan
NO: Ellis
ABS, ABST OR NV: Bauer-Kahan, Castillo
ASM APPROPRIATIONS: 10-1-4
YES: Wicks, Arambula, Calderon, Caloza, Fong, Mark González, Krell, Pacheco, Pellerin, Solache
NO: Dixon
ABS, ABST OR NV: Hoover, Sharp-Collins, Ta, Tangipa
UPDATED
VERSION: August 13, 2026
CONSULTANT: Josh Tooker / E.S. & T.M. / (916) 319-3965 FN: 0003483
Date of Hearing: August 5, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 811
Author:(Caballero) – As Amended Ver:June 25, 2026
Policy Committee: | Environmental Safety and Toxic Materials | Vote: | 4 - 1 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill establishes a new regulatory structure at the Department of Toxic Substances Control (DTSC) for metal shredding facilities, separate from laws governing the control of hazardous waste.
Specifically, this bill, among other things:
1) Provides that a metal shredding facility that is subject to regulation and complies with the requirements of this bill is not a hazardous waste facility but further provides that this bill does not alter or override the authority of DTSC or a Unified Program Agency to regulate hazardous waste generated at a metal shredding facility in accordance with Chapter 6.5 of Title 22 of the California Code of Regulations (the state’s Hazardous Waste Control Law (HWCL)).
2) Requires DTSC to adopt regulations related to the imposition of fees on metal shredding facilities, allows DTSC to use emergency regulations for this purpose, and authorizes the department to adopt and update regulations as necessary to implement the remaining provisions of this bill.
3) Requires a metal shredding facility to receive a permit from DTSC to operate in the state and specifies numerous requirements and procedures, including, among other things, requirements for obtaining a permit, for being deemed to have a permit, for operating a metal shredding facility, for incorporating into a facility's fire response plan any reasonable and necessary requirements recommended by the local fire department, for DTSC to consider the size and nature of a small metal shredding facility when processing a permit application and assessing fees, for managing metal shredder aggregate (MSA), for transporting certain materials related to metal shredding, for providing notice, and for maintaining a closure plan.
4) Requires DTSC, among many other things, to hold a public meeting before making a decision to approve or deny an application, to take final action on a permit application by an existing facility within three years, as provided, to post on its website general information about each metal shredding facility that has applied for or obtained a permit, and to conduct at least one site visit to the applicant’s facility after receipt of a permit application. Requires the Board of Environmental Safety (BES), on or before July 1, 2030, to hold a public meeting regarding implementation of this bill, solicit stakeholder input, and make recommendations to DTSC regarding the implementation and administration of this bill.
5) Requires (a) DTSC to collect an annual fee from each metal shredding facility subject to the requirements of this bill at a rate sufficient to reimburse the department’s reasonable costs to implement all aspects of this bill, other than costs incurred in connection with DTSC’s review and issuance of metal shredding facility permits; (b) requires the fee established pursuant to this bill be deposited in the Metal Shredders Facility Account (MSFA) and to be sufficient to reimburse the department’s reasonable costs to implement AB 2851 (Bonta), Chapter 743, Statutes of 2024 (related to fence-line air quality monitoring at metal shredding facilities), as provided; (c) allows BES to annually adjust fees and specifies factors DTSC must consider in establishing the fee amount; and (d) exempts a metal shredding facility paying an annual fee in accordance with this bill from certain existing fees, except as specified.
6) Requires (a) a person who applies for a metal shredding facility permit under this bill to enter into a written agreement with DTSC to reimburse the department for the direct costs reasonably incurred by the department in processing the application, as specified; (b) this agreement to provide for a 25% advance payment; and (c) an applicant for a metal shredding facility permit to also pay all costs incurred by DTSC for purposes of complying with the California Environmental Quality Act.
7) Provides that certain authority granted to DTSC in Chapter 6.5 and its implementing regulations may be used to enforce this bill, including to enforce the HWCL against facilities that operate without timely applying for a permit, continue operating after permit denial or revocation, or cause offsite releases of hazardous waste.
8) Authorizes DTSC, under specified conditions, to order the temporary cessation of shredder operations, prohibit the receipt of additional shredder feedstock by the facility, and prohibit the receipt of shredder feedstock at a metal shredding facility on a temporary basis.
9) Authorizes DTSC to deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility under specified conditions.
FISCAL EFFECT:
1) DTSC estimates ongoing costs of $2.6 million (MSFA, other funds) and six positions to cover its oversight, regulatory, and anticipated litigation costs. The bill requires that all of DTSC’s costs be reimbursed by an annual fee imposed on metal shredding facilities, as well as via a reimbursement agreement to cover the department’s direct costs related to processing permit applications. DTSC notes its cost estimate is based on the workload related to its oversight of metal shredding facilities currently operating in the state, and that an increase in the number of facilities seeking permits and requiring oversight may necessitate additional resources.
The 2022 Budget Act provided DTSC with $5.9 million ongoing and 21 positions from the Hazardous Waste Control Account to implement the Metal Shredder Initiative, address the workload associated with the oversight and enforcement of metal shredder sites, and process permit applications for metal shredders to become authorized facilities. Since the Metal Shredder Initiative was first approved, the statutory and regulatory landscape for metal shredders has changed. Principally, metal shredders are no longer DTSC-permitted facilities, and according to the department, funding previously approved to permit these facilities are no longer required at the same level. Accordingly, the 2026 Budget Act includes an ongoing reduction of $1.9 million and 4.9 positions to better align the department’s resources for oversight of metal shredding facilities to its operational needs. DTSC’s cost estimate for this bill reflects and accounts for this shift in funding.
Relatedly, AB 2851 requires DTSC to develop an annual fee sufficient to fund the costs of metal shredding oversight activities (such as fence-line monitoring). AB 2851 provided DTSC authority to create the new fee through the emergency rulemaking process. DTSC is finalizing the emergency regulations required to establish and collect the annual fee from metal shredding facilities beginning in fiscal 2026-27 and has begun working on developing additional regulations on fence-line air monitoring through the full rulemaking process. Given that SB 811 similarly requires DTSC to collect an annual fee from each metal shredding facility subject to the requirements of this bill, it is likely the department will need to adjust or consolidate the two fees in or after 2027.
2) The Department of Justice (DOJ) anticipates costs of an unknown, but potentially significant, amount (Legal Services Revolving Fund, General Fund) related to client (DTSC) representation, litigation, and enforcement-related work.
3) Cost pressures (Trial Court Trust Fund, General Fund) of an unknown amount to the courts to adjudicate civil or criminal actions authorized by this bill. Actual costs will depend on the number of cases filed and the amount of court time needed to resolve each case. It generally costs approximately $1,000 to operate a courtroom for one hour. Although courts are not funded on the basis of workload, increased pressure on the Trial Court Trust Fund may create a demand for increased funding for courts from the General Fund. The state budget provides annual General Fund backfills to the Trial Court Trust Fund to offset revenue reductions, totaling approximately $117.3 million in 2025-26.
COMMENTS:
1) Purpose. According to the author:
This bill will ensure that California remains a sustainability leader in ‘reducing, reusing and recycling’ by fostering the recycling of scrap metal into new metal products, while at the same time protecting adjoining communities from environmental pollution.
2) Background. Metal Shredders. Metal shredding facilities process end-of-life vehicles, appliances, and other forms of scrap metal to facilitate the separation and sorting of ferrous metals, nonferrous metals, and other recyclable materials from non-recyclable materials. These operations create MSA, a mixture of both valuable metals and non-metallic components consisting of plastic, rubber, and glass from the original feedstock. MSA often contains hazardous constituents that may cause harm to people and the environment. DTSC’s oversight of metal shredding operations includes annual inspections of each facility and responding to releases of hazardous waste and hazardous substances where those operations occur. Over the last two years, DTSC has responded to 15 offsite releases and three fires at metal shredding facilities. There are currently ten metal shredding facilities in the state, some operating under regulatory authorization from the 1980s and 1990s. For a more detailed discussion of the regulatory, legislative, legal, and enforcement history surrounding metal shredding facilities in the state, see the Assembly Environmental Safety and Toxic Materials Committee’s analysis of this bill.
3) Support and Opposition. Among a diverse coalition of supporters, the California Council for Environmental & Economic Balance (CCEEB) writes that DTSC has been regulating the metal shredding industry using hazardous waste enforcement authority on a facility-by-facility basis, which has created an uncertain and inconsistent legal environment for the facilities. CCEEB notes that following years of stakeholder discussions, this bill ensures comprehensive oversight and enforcement of metal shredding facilities under DTSC’s authority, while recognizing the difference between these facilities and facilities that engage in the treatment, storage, and disposal of solid and hazardous waste. The bill requires both existing and new facilities to obtain a DTSC permit and requires these facilities to meet specified operational and performance standards.
Writing in opposition, a coalition of environmental and environmental justice groups argue the materials managed at metal shredding facilities are hazardous waste and must be regulated as such under California’s hazardous waste laws. The coalition writes:
Instead of SB 811’s overly complicated approach, California should regulate metal shredding facilities under the existing hazardous waste framework, including by promptly requiring the facilities to obtain hazardous waste permits with conditions necessary to protect human health and the environment. [DTSC] should then be directed to develop additional requirements, within the existing hazardous waste legal framework, tailored to address the ongoing problems we’ve seen at metal shredding facilities—including fires and dispersal of heavy metals into surrounding communities.
Writing in an oppose-unless-amended position, a coalition of small metal recyclers states:
We request that SB 811 be amended to clearly distinguish between the two pathways for proper regulation of metal shredder residue. Under our proposed amendments, the small metal recyclers that do not chemically treat metal shredder residue and that have obtained all necessary permits and authorizations from the myriad agencies with jurisdiction over different facets of metal shredding operations, would continue to be regulated by DTSC under DTSC's own hazardous waste generator regulations. As such, these facilities would not need to obtain the permit contemplated in SB 811. The SB 811 permitting process would be the primary means of authorizing and regulating the chemical treatment of metal shredder residue and would also serve as the backstop for facilities that do not have all the necessary regulatory mechanisms in place.
4) Related Legislation. SB 404 (Caballero) of the current legislative session was substantially similar to this bill and was vetoed by the Governor. SB 811 is nearly identical to SB 404 aside from new language intended to resolve the implementation issues raised in the Governor’s veto message. The amendments make clear that the requirements of the bill apply to both metal processing operations and the materials processed by those operations, and that DTSC retains authority under the HWCL to pursue enforcement against metal shredding facilities in specific circumstances.
Analysis Prepared by: Nikita Koraddi / APPR. / (916) 319-2081
Date of Hearing: June 30, 2026
ASSEMBLY COMMITTEE ON ENVIRONMENTAL SAFETY AND TOXIC MATERIALS
Damon Connolly, Chair
SBPCA Bill Id:SB 811
Author:(Caballero) – As Amended Ver:June 25, 2026
SENATE VOTE: 40-0
SUBJECT: Hazardous materials: metal shredding facilities
SUMMARY: Requires the owner or operator of a metal shredding facility to obtain a permit from the Department of Toxic Substances Control (DTSC). Prohibits a metal shredding facility from operating in the state without a permit. Includes within the permit: requirements for managing various wastes within and leaving the facility, measures to prevent fires, and measures to reduce impacts to communities near the facility. Provides that local and state regulators retain enforcement authority with respect to metal shredding facilities, as that authority exists under current law. Specifically, this bill:
1) Defines "chemically treated metal shredder residue" or "CTMSR" as the waste generated from the processing of shredded metallic materials, which may include, but is not limited to, end-of-life vehicles, appliances, and other metal-containing items, by a metal shredding facility where recoverable ferrous or nonferrous metals have been removed and the remaining metal shredder residue has been treated by a waste stabilization process, as described.
2) Defines "existing metal shredding facility" as a metal shredding facility that is conducting metal shredding and metal processing operations as of the date that the act adding this bill is signed into law by the Governor.
3) Defines "feedstock" as material received by a metal shredding facility before shredding and processing, including, but not limited to, end-of-life vehicles, household appliances, or other forms of light gauge metal suitable for processing in a metal shredder.
4) Defines "light fibrous material" as a fibrous mixture of nonmetallic materials, including, but not limited to, synthetic fabric and carpet fibers, and entrained metallic particles, often representing the lightest fraction of metal shredder aggregate produced from the shredding of end-of-life vehicles and other metallic items, which is susceptible to dispersal into the environment.
5) Defines "metal processing operations" as the stockpiling and handling of metal shredder aggregate; the operations undertaken to separate, sort, and remove ferrous or nonferrous scrap metal from metal shredder aggregate; and the treatment and storage of metal shredder residue. Metal processing operations do not include shredding, crushing, baling, shearing, cutting, or other metal recycling operations unrelated to the handling of metal shredder aggregate.
6) Defines "metal shredder aggregate" as the mixture of shredded metallic and nonmetallic materials that is produced by the shredding of metallic feedstock and that is subsequently processed for the purpose of separating, sorting, and removing ferrous metals, nonferrous metals, or other recyclable commodities from nonrecyclable materials. Metal shredder aggregate does not include metals that have been removed from metal shredder aggregate, or metal shredder residue.
7) Provides that metal shredder aggregate is an in-process material and is not a waste or a hazardous waste.
8) Defines "metal shredder residue" as waste comprising shredded plastics, rubber, glass, foam, fabric, carpet, wood, dirt, or other debris that remains after recoverable ferrous and nonferrous metals or other recyclable commodities have been separated and removed from metal shredder aggregate. Metal shredder residue does not include chemically treated metal shredder residue.
9) Defines "metal shredding facility" as the entire site under the control of the owner or operator of a facility that uses a stationary or mobile shredder, such as a hammer mill or other shredding technique, to process end-of-life vehicles, appliances, or other metallic feedstock materials in order to facilitate the separation, sorting, or removal of recoverable ferrous or nonferrous metals from nonrecyclable materials. "Metal shredding facility" does not include a feeder yard or other scrap metal recycling facility that operates a metal crusher, a metal shear, or a metal baler if that facility does not conduct metal shredding operations.
10) Defines "new metal shredding facility" as a metal shredding facility that had not commenced metal shredding and metal processing operations as of the effective date of this bill.
11) Exempts the following facilities from regulation under the requirements of this bill:
a) Facilities that shred only electronic waste (e-waste);
b) Facilities that shred wood or wood products that may contain ancillary metal components, including, but not limited to, screws, bolts, metal ties, and metal strapping;
c) Facilities that shred only automotive tires;
d) A feeder yard or other scrap metal recycling facility that operates a metal crusher, metal shear, or metal baler if that facility does not conduct metal shredding operations; and,
e) A metal shredding facility that processes exclusively nonferrous metals that do not contain any nonmetallic materials and whose operations do not produce any metal shredder aggregate or result in the generation of metal shredder residue.
12) Provides that metal shredding facilities that are subject to regulation and comply with the requirements of this bill are not hazardous waste facilities. However, further provides that this bill does not alter or override the authority of DTSC or a Unified Program Agency, to regulate ancillary hazardous waste generated at a metal shredding facility.
13) Provides that this bill does not limit the authority of a local air pollution control district, air quality management district, Unified Program Agency, or local environmental health department that is not a Unified Program Agency.
14) Authorizes DTSC to adopt regulations as necessary to implement this bill, and thereafter to update and revise the regulations from time to time, consistent with the requirements of this bill.
15) Requires DTSC to adopt regulations relating to the imposition of fees on metal shredding facilities.
16) Prohibits, unless otherwise specified, a metal shredding facility from operating in California, unless it has a permit issued by DTSC.
17) Authorizes, on and after the effective date, an existing metal shredding facility operating in compliance with the requirements of this bill to continue to operate, pending final action on a permit application, as specified in this bill. Requires, without exception, the facility to have developed and continuously implement a fire prevention, detection, and response plan and comply with the limitations on pile size and duration set forth in this bill. Provides that nothing herein shall prevent DTSC from taking enforcement action before issuance of a final permit.
18) Requires any permit approved by DTSC pursuant to this bill to include a reference to all permits issued to the facility by other environmental regulatory agencies. Requires DTSC to evaluate how to apply, to metal shredding facilities, its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations as described in existing law (Health and Safety Code (HSC) § 25200.21(b-c))
19) Requires DTSC to determine, on the basis of substantial evidence, that operation of the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities, before taking final action to issue a permit for a metal shredding facility under this bill.
20) Requires, within 30 days of the effective date of this bill, the owner or operator of an existing metal shredding facility to submit a notice of intent to apply for a permit. Thereafter, requires the owner or operator of an existing metal shredding facility to apply for a permit pursuant to this bill no later than six months following submittal of the notice of intent and to provide all of the following information to DTSC:
a) A description of the metal processing operations conducted at the metal shredding facility, including all equipment used for this purpose;
b) A metal shredding facility inspection plan, including, without limitation, inspection of the area surrounding the hammer mill and all downstream metal processing equipment where light fibrous material is likely to accumulate;
c) A plan for the prevention, detection, and response to fires;
d) A closure plan;
e) A metal shredding facility housekeeping plan that includes, but is not limited to, daily cleanup of light fibrous material that is susceptible to dispersal beyond the hammer mill;
f) An inventory management plan that includes procedures that will be implemented to ensure compliance with the limitations on pile size and duration set forth in this bill;
g) Evidence of financial assurance for closure and third-party liability consistent with the requirements of existing regulations;
h) A plan describing any offsite or out-of-state transportation and processing of metal shredder aggregate and metal shredder residue, including, but not limited to, the estimated amount of material that is transported, the identity and federal Standard Industrial Classification code of the receiving facility, the estimated amounts of metals that are recovered from the material that is transported offsite, the required insurance, and any other information requested by DTSC to evaluate whether metal recycling operations are being conducted at the receiving facility; and,
i) A compliance plan and schedule if required pursuant to the requirements of this bill.
21) Requires DTSC to review the permit application as expeditiously as possible and take final action to approve, modify, or deny the application within three years after the application has been determined to be complete. Provides that failure of the owner or operator to provide a complete permit application within one year shall be grounds for DTSC to initiate denial of the application, subject to specified conditions.
22) Requires DTSC to impose any additional facility-specific conditions that are necessary to ensure compliance with this bill and for the protection of human health and the environment.
23) Requires DTSC, in considering an application for a metal shredding facility permit submitted pursuant to this bill, and the specific terms and conditions to be included in the permit, to consider the site-specific aspects of the metal shredding facility, including, but not limited to:
a) The nature of the surrounding community and environment;
b) The results of any community-specific assessment;
c) The facility size, location, and configuration;
d) The equipment, enclosures, and infrastructure;
e) The specific metal processing operations conducted at the metal shredding facility, including types of feedstock and annual throughput; and,
f) Other relevant site-specific characteristics.
24) Requires the owner or operator of a new metal shredding facility to submit an application to DTSC for a permit and prohibits the owner or operator from commencing operations at the new metal shredding facility until DTSC has approved a permit.
25) Requires DTSC, in reviewing a facility's application for permit renewal, to consider the compliance history of the metal shredding facility, including the requirements of any permit issued by any other agency.
26) Requires, before the submission of a permit application or application for permit renewal for a metal shredding facility, the applicant to hold at least one public meeting, or other community engagement activity approved by DTSC, to inform the community of metal processing activities and any potential impacts to nearby communities and to solicit questions and input from the public.
27) Requires DTSC to include in the fire response plan for a metal shredding facility any reasonable and necessary additional requirements or conditions that are recommended by the local fire department.
28) Requires DTSC, when considering the application for a small metal shredding facility, to take into consideration the size and nature of the facility when processing the permit application and assessing fees.
29) Authorizes an owner or operator of a metal shredding facility that has submitted a permit application and is unable to comply with all the requirements of this bill as of the effective date to continue to operate, pending DTSC's review and approval or denial of the permit application, subject to all of the following requirements:
a) The owner or operator identifies in its application each provision of this bill that the facility is unable to immediately comply with and has developed and implemented a plan and schedule approved by DTSC for achieving compliance with the provisions of this bill;
b) On or before the effective date, the owner or operator has developed and implements a written plan for the prevention, detection, and response to fires that meets the requirements of this bill. Requires that a copy of the fire response plan be submitted to DTSC within seven days of the effective date, and subject to review and approval of DTSC after consultation with the facility and the local fire department of the jurisdiction where the facility is located;
c) On or before the effective date, the owner or operator complies with the limitations on pile size and duration set forth in this bill;
d) The owner or operator initiates, diligently pursues, and implements financial assurance for closure and third-party liability as required pursuant to this bill, including, but not limited to, both of the following:
i) The owner or operator initiates and diligently pursues to completion a preliminary endangerment assessment, as required pursuant to this bill, and initiates any required actions identified in the preliminary endangerment assessment; and
ii) The owner or operator, at a minimum, maintains all existing practices and controls that are in effect or otherwise required by DTSC, a Unified Program Agency, or a local environmental health department on or before the effective date, that are designed to prevent the possibility of any unplanned sudden or non-sudden release of in-process materials; hazardous waste; metal shredder residue; or, chemically treated metal shredder residue, into air, soil, or surface water that could threaten human health or the environment; and,
e) The owner or operator shall be subject to any interim measures or controls established by DTSC during consideration of the permit application that are necessary for the protection of human health and the environment.
30) Requires the owner or operator of a metal shredding facility to operate the metal shredding facility in accordance with all of the following requirements:
a) The metal shredding facility shall be maintained and operated to minimize the possibility of a fire, explosion, or any unplanned sudden or non-sudden release of in-process materials or components thereof, including metal shredder aggregate and light fibrous material, into air, soil, or surface water that could threaten human health or the environment by implementing all reasonable and feasible operational or engineering methods of control, including, but not limited to, technologies or equipment, taking into consideration the size, configuration, and location of the facility, the characteristics of the materials handled, and other relevant factors;
b) The owner or operator of the metal shredding facility shall develop and follow an inbound source control policy designed to prevent the shredding of any of the following materials or wastes at the facility:
i) Federal Resources Conservation and Recovery Act (RCRA) hazardous waste, and non-RCRA hazardous waste;
ii) Asbestos and asbestos-containing materials, except incidental asbestos-containing material that may be contained inside equipment and is not visible upon inspection;
iii) Radioactive materials;
iv) Petroleum-based wastes, including, but not limited to, used oil, gasoline, and diesel, but not including non-free-flowing residual quantities of such wastes contained in depolluted vehicles or appliances;
v) Polychlorinated biphenyls (PCB) materials and wastes, including, but not limited to, capacitors, electrical transformers, and transformer components;
vi) Fluorescent light ballasts, fluorescent lamps, neon, and high-intensity or mercury vapor lights;
vii) Military ordnance, except ordnance designated specifically as Material Designated as Safe;
viii)Explosives, explosive residues, fireworks, and other incendiary materials;
ix) Regulated electronic waste;
x) Mercury containing devices;
xi) Batteries, including, but not limited to, lead-acid batteries and lithium-ion batteries; and,
xii) Compressed gas cylinders and propane canisters, unless empty and disabled.
31) Requires the owner or operator of the metal shredding facility to develop and implement procedures for any depollution operations that are conducted at the metal shredding facility involving the removal of automotive fuels, lubricating oils, refrigerants, and materials that require special handling, as defined in existing law (Public Resources Code (PRC) § 42167), including procedures for the proper management of those materials or wastes that are removed during depollution operations, pursuant to existing law (HSC § 25212).
32) Authorizes the owner or operator of a metal shredding facility to make specified physical or operational changes to the metal shredding facility without seeking prior approval from DTSC.
33) Requires the owner or operator of a metal shredding facility to manage all metal shredder aggregate, untreated and treated metal shredder residue during metal processing operations as necessary to achieve the following minimum standards:
a) All outdoor equipment used for processing or conveyance of metal shredder aggregate shall be enclosed or covered and designed, operated, and maintained to minimize the possibility of the release of light fibrous material into the environment;
b) All vehicles used for the outdoor transfer of metal shredder aggregate shall be loaded and unloaded in a manner that minimizes the possibility of the release of metal shredder aggregate, including light fibrous material into the environment; and,
c) Metal shredder aggregate shall be stored or accumulated inside a structure that protects the material from exposure to the elements and minimizes the possibility of the release of light fibrous material into the environment. At a minimum, the structure shall meet all of the following requirements:
i) The structure shall be enclosed with a floor, roof, and walls sufficient to protect the metal shredder aggregate from exposure to the elements and to contain the metal shredder aggregate and any process residues that are managed in the structure;
ii) The roof shall completely cover all areas used for storage or accumulation of metal shredder aggregate; and,
iii) The floor shall be constructed of concrete surfacing, steel plate, or other surfacing material approved by the department designed to prevent infiltration and collect and route any water that drains from the metal shredder aggregate to a process water management system.
34) Provides that, if managed in accordance with this bill, including any plans approved by DTSC and any additional conditions imposed by DTSC, the following materials are not waste, and shall not be subject to regulation by the state Hazardous Waste Control Law (HWCL):
a) Scrap metal;
b) Metal shredder aggregate that is managed according to specified requirements;
c) Intermediate metal products that are subject to further processing to improve product quality;
d) Finished ferrous and nonferrous metal commodities that are separated or removed from metal shredder aggregate at a metal shredding facility; and,
e) Nonmetallic recyclable items recovered from metal shredder aggregate for which a market exists.
35) Requires metal shredder aggregate, including light fibrous material, which is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, to be subject to regulation as hazardous waste under the HWCL, if it exhibits a characteristic of hazardous waste.
36) Requires untreated metal shredder residue that meets the definition of a non-RCRA hazardous waste to be chemically treated in accordance with the requirements of this bill or managed in accordance with all applicable requirements of the HWCL. Chemically treated metal shredder residue is not hazardous waste if all of the specified conditions are met.
37) Provides that the owner or operator of a metal shredding facility is not required to treat metal shredder residue.
38) Requires, within one year after the effective date of this bill, the owner or operator of a metal shredding facility to conduct a preliminary endangerment assessment, and to submit it to DTSC. Requires the owner or operator of a metal shredding facility to conduct appropriate corrective action as needed to address releases of hazardous materials or wastes that pose a significant threat to human health or the environment.
39) Requires the owner or operator of a metal shredding facility to provide DTSC with immediate notice of a fire or other incident at the metal shredding facility that requires the assistance of a local fire department or other first responder.
40) Requires the owner or operator of a metal shredding facility to establish an effective means of providing public notice to members of the surrounding community upon the occurrence of a fire or other incident that poses a threat to human health or the environment outside of the facility.
41) Requires the Board of Environmental Safety,, on or before July 1, 2030, to hold a public meeting to hear from DTSC and receive input from members of the public, metal shredding facilities, and other interested stakeholders on the implementation of this bill.
42) Requires the owner or operator of a metal shredding facility to have a written closure plan, subject to approval by DTSC, which covers how to safely close the facility including a closure cost estimate.
43) Requires the owner or operator to provide a financial assurance mechanism for closure of the metal shredding facility using one or more of the financial mechanisms described in regulations within the authority of the HWCL. Additionally requires the owner or operator to provide a financial assurance mechanism for bodily injury and property damage to third parties caused by sudden accidental occurrences arising from operations of the metal shredding facility.
44) Requires DTSC, via regulations, including emergency regulations, adopted by DTSC, to collect an annual fee on all metal shredding facilities that are subject to the requirements of this bill, to reimburse DTSC's reasonable costs to implement all aspects of this bill, other than costs connected to review of a facility's permit.
45) Requires a person who applies for a metal shredding facility permit under this bill to enter into a written agreement with DTSC, such that the person will reimburse DTSC for the direct costs reasonably incurred in processing the application. Requires the facility to reimburse DTSC's costs sufficient to cover review of the permit application, the conduct of public meetings and notices associated with the permit process, and preparation of the permit.
46) Provides that the enforcement authority granted to DTSC under the HWCL and its implementing regulations may be used to enforce the provisions of this bill, including, but not limited to, the authority to pursue administrative or judicial enforcement for violations of this bill and any implementing regulations, to suspend the authorization of any metal shredding facility that has been determined based on substantial evidence to pose an imminent and substantial endangerment to human health or the environment, and to deny an application for a permit for any of the reasons set forth in this bill.
47) Authorizes DTSC to order the temporary cessation of shredder operations and may prohibit the receipt of additional shredder feedstock by the facility, under specified conditions.
48) Authorizes DTSC to prohibit the receipt of shredder feedstock at a metal shredding facility on a temporary basis if the owner or operator exceeds the limitations relating to pile size and duration set forth in this bill.
49) Authorizes DTSC to deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility under this bill. A denial, revocation, or suspension shall be based on at least one of the following:
a) Noncompliance with a condition of the applicable permit that results in a significant threat to human health or the environment;
b) An owner or operator’s failure in the application or during the approval process to disclose fully all relevant facts or a misrepresentation of any relevant fact at any time;
c) A determination, supported by substantial evidence, that the permitted activity poses a danger to human health or the environment that can only be addressed by permit denial, modification, suspension, or revocation; or,
d) Any cause specified in HSC § 25186 under the HWCL (which allows for denial, revocation, etc., if a person violates one of the state or federal environmental laws or regulations listed within the HWCL).
50) Requires DTSC, if DTSC takes an action to deny, revoke, or suspend a permit under this bill, to provide notice of the proposed action to the owner or operator of the metal shredding facility by certified mail, with return receipt requested or by personal service.
51) Authorizes an owner or operator who wishes to appeal that action [to deny, revoke or suspend a permit] to appeal by submitting a letter to DTSC, within 10 days of receipt of notice of the action and requesting a hearing.
52) Provides that, except for permit decisions, proceedings to appeal any decision made by DTSC under this bill, shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code. Requires, before initiating an appeal, the owner or operator of a facility to meet and confer with DTSC in a good faith effort to resolve the dispute.
53) Provides that proceedings to appeal DTSC's decision concerning the denial, revocation, or suspension of a permit to operate a metal shredding facility pursuant to this bill shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code.
54) Provides that nothing in this bill, and no action taken by DTSC pursuant to this bill, shall be construed as a limitation on the right of a city attorney, county counsel, district attorney, or the Attorney General to maintain a civil or criminal prosecution or of any person to maintain any civil action otherwise authorized by law.
55) Exempts from the definition of hazardous waste, under the HWCL:
a) Chemically treated metal shredder residue (if treated according to the provisions of this bill);
b) Scrap metal;
c) Metal shredder aggregate (managed in accordance with the requirements of this bill);
d) Intermediate metal products that are subject to further processing to improve product quality;
e) Finished ferrous and nonferrous metal commodities that are separated or removed from metal shredder aggregate at a metal shredding facility; and,
f) Nonmetallic recyclable items recovered from metal shredder aggregate for which a market exists.
EXISTING LAW:
1) Requires DTSC to enforce the standards within the HWCL and the regulations adopted by DTSC pursuant to the HWCL. (HSC § 25180)
2) Authorizes DTSC to deny, suspend, or revoke any permit, registration, or certificate applied for, or issued pursuant to, the HWCL. Includes within this authority the ability of DTSC to deny, suspend, or revoke any permit, registration, or certificate applied for any violation of various state and federal environmental laws and regulations further specified. (HSC § 25186)
3) Authorizes DTSC to issue permits for the use and operation of one or more hazardous waste management units at a facility that meets the standards adopted pursuant to the HWCL. (HSC § 25200 (a))
4) Requires DTSC to impose conditions on each permit specifying the types of hazardous wastes that may be accepted for transfer, storage, treatment, or disposal. (HSC § 25200 (a))
5) Requires DTSC, on or before January 1, 2018, to adopt regulations establishing or updating criteria used for the issuance of a new or modified permit or renewal of a permit, which may include criteria for the denial or suspension of a permit; how to address cumulative impacts to nearby populations of a facility; and, minimum setback distances from sensitive receptors. (HSC § 25200.21)
6) Creates within DTSC the Board of Environmental Safety (Board), consisting of five voting members; requires the Board to set regulatory fees; hear and decide appeals of hazardous waste facility permit decisions; provide opportunities for public hearings on permitted or remediation sites; review and consider for approval the director of DTSC's annual priorities; conduct an analysis of DTSC's regulatory fee structure; and conduct an analysis of DTSC's programs. (HSC § 25125)
7) Authorizes DTSC, in consultation with the Department of Resources, Recycling and Recovery, the State Water Resources Control Board, and affected local air quality management districts, to adopt regulations establishing management standards for metal shredding facilities for hazardous waste management activities within DTSC's jurisdiction as an alternative to the requirements specified in the HWCL (this authority expired on January 1, 2018). (HSC § 25150.82 (c))
8) Authorizes DTSC to collect an annual fee from all metal shredding facilities that are subject to the requirements of the HWCL or to the alternative management standards adopted pursuant to HSC § 25150.82. Requires DTSC to establish and adopt regulations necessary to administer this fee and to establish a fee schedule that is set at a rate sufficient to reimburse DTSC's costs to implement the HWCL as applicable to metal shredder facilities. Authorizes the fee schedule established by DTSC to be updated periodically as necessary and requires the assessment to be no more than the reasonable and necessary cost of DTSC to implement the HWCL, as applicable to metal shredder facilities. (HSC § 25150.84 (a))
9) Defines "metal shredding facility" as an operation that uses a shredding technique to process end-of-life vehicles, appliances, and other forms of scrap metal to facilitate the separation and sorting of ferrous metals, nonferrous metals, and other recyclable materials from nonrecyclable materials that are components of the end-of-life vehicles, appliances, and other forms of scrap metal. "Metal shredding facility" does not include a feeder yard, a metal crusher, or a metal baler, if that facility does not otherwise conduct metal shredding operations. (HSC § 25150.82 (b))
10) Prohibits materials that require special handling (MRSH),contained in major appliances, from being disposed of at a solid waste facility and requires them to be removed from major appliances in which they are contained prior to the appliance being crushed, baled, shredded, sawed or sheared apart, disposed of, or otherwise processed in a manner that could result in the release or prevent the removal of materials that require special handling. Once removed, these MRSH shall be managed as a hazardous waste and any violations related to the management of MRSH are subject to the violations in the HWCL. (HSC § 25212)
11) Requires materials that require special handling to be removed from major appliances and vehicles in which they are contained prior to crushing for transport or transferring to a baler or shredder for recycling. (PRC § 42175)
12) Defines "vehicle" as any device used for transportation, including bicycles, airplanes, and other transportation devices not used on highways, and automobiles and other vehicles, as defined in Section 670 of the Vehicle Code. (PRC § 42165)
13) Defines "major appliance" as any domestic or commercial device, including, but not limited to, a washing machine, clothes dryer, hot water heater, dehumidifier, conventional oven, microwave oven, stove, refrigerator, freezer, air-conditioner, trash compactor, and residential furnace. (PRC § 42166)
FISCAL EFFECT: Unknown.
COMMENTS:
Need for the bill: According to the author:
"Metal shredding facilities recycle millions of end-of-life vehicles, household appliances, and other metallic items produced, used, and discarded annually in California. Unless recycled, these metal materials would rapidly overwhelm all available landfill capacity, creating a massive accumulation of damaged and abandoned cars, appliances, and other items.
Metal shredding poses environmental concerns to surrounding communities because the shredding process has the potential to release particulate materials and has a risk of causing fire. The current framework for hazardous waste does not include metal shredding facilities and therefore the facilities are not required to obtain a permit and are not regulated by the California Department of Toxics and Substance Control (DTSC). Without a comprehensive regulatory framework, DTSC on their own has begun to regulate the industry on a facility-by-facility basis using a hazardous waste enforcement framework, creating an uncertain and inconsistent legal environment, which has resulted in litigation.
SB 811 will resolve this uncertainty, end the litigation, and ensure comprehensive and robust oversight and enforcement of metal shredding facilities under DTSC’s authority. This bill will ensure that California remains a sustainability leader in ‘reducing, reusing and recycling’ by fostering the recycling of scrap metal into new metal products, while at the same time protecting adjoining communities from environmental pollution.
SB 811 includes provisions to address the governor’s veto message on SB 404."
California Hazardous Waste Control Law (HWCL): The HWCL is the state's program that implements and enforces federal hazardous waste law in California and directs DTSC to oversee and implement the state's hazardous waste laws and regulations. Any person who stores, treats, or disposes of hazardous waste must obtain a permit from DTSC. The HWCL covers the entire management of hazardous waste, including hazardous waste generation, management, transportation, and ultimately disposal into a state or federally authorized facility.
DTSC's hazardous waste management permitting program: DTSC is responsible for administering the hazardous waste facility permitting program established under the HWCL and the federal RCRA. The core activities of the permitting program include: review of RCRA and non-RCRA hazardous waste permit applications to ensure safe design and operation; issuance and denial of operating permits; issuance of post-closure permits; approval and denial of permit modifications; issuance and denial of emergency permits; review and approval of closure plans; oversight of approved closure plans; and, ensuring a public process on the permitting of hazardous waste facilities.
DTSC's hazardous waste management enforcement program: DTSC's inspection and enforcement responsibilities include its delegated authority under RCRA, California's HWCL, and state laws pertaining to toxics in packaging, toxic substances in consumer products, and disposal of universal wastes, such as electronic waste. Core activities of DTSC's hazardous waste management program include routine and targeted compliance inspections. Routine compliance inspections involve review of submitted data and reports, as well as physical observation, testing, and evaluation of regulated facilities. Targeted compliance inspections involve review of specific units or processes in response to focused concerns or to inform permitting decisions, as well as analysis of current and historical compliance.
Metal shredder facilities: California law defines a "metal shredding facility" as an operation that uses a shredding technique to process end-of-life vehicles, appliances, and other forms of scrap metal to facilitate the separation and sorting of ferrous metals, nonferrous metals, and other recyclable materials from non-recyclable materials. A "metal shredding facility" does not include a feeder yard, a metal crusher, or a metal baler, if that facility does not otherwise conduct metal shredding operations. As such, most scrap metal recycling facilities would not be subject to any proposed regulations meant to manage the waste generated from metal shredding facilities.
Currently, there are ten metal shredding facilities operating in California. Seven of these are larger facilities, and 3 of them process a much smaller amount of metal. These facilities are located in the following cities: Anaheim, Bakersfield, Colton, Lancaster, Los Angeles, Oakland, Redwood City, Stockton, Sun Valley, and Vallejo.
Metal shredder waste: The shredding of scrap metal (e.g., end-of-life vehicles) results in a mixture of recyclable materials (e.g., ferrous metals and nonferrous metals) and non-recyclable material (i.e., metal shredder waste). Aggregate is generated after the initial separation of ferrous metals and consists of nonferrous metals that can be further recovered and metal shredder waste. Metal shredder waste consists mainly of glass, fiber, rubber, automobile fluids, dirt, and plastics in automobiles and household appliances that remain after the recyclable metals have been removed. Because scrap metal contains regulated hazardous constituents, it can contaminate and ultimately cause metal shredder waste to exhibit a characteristic of hazardous waste for toxicity. In a 2002 draft report on auto shredder waste, DTSC showed that metal shredder waste often exceeded the soluble threshold limit concentrations (STLCs) for lead, cadmium, and zinc.
Non-hazardous waste classification granted to metal shredding facilities: Based on the hazardous characteristics of metal shredder waste, in many instances, metal shredding facilities are hazardous waste generators and are thus subject to hazardous waste requirements, including permitting, transportation, and disposal. In the late 1980s, in an effort to relieve metal shredding facilities of these requirements, the Department of Health Services (DHS) (the predecessor of DTSC) determined that the metal treatment fixation technologies were capable of lowering the soluble concentrations of metal shredder waste such that the treated metal shredder waste was rendered insignificant as a hazard to human health and safety, livestock, and wildlife. Seven metal shredding facilities applied for and were granted nonhazardous waste classification letters by DHS, and later DTSC, if they used the metal treatment fixation technologies. The authority to issue these classifications is found in subdivision (f) of Section 66260.200 of Title 22 of the California Code of Regulations, and these determinations are now known as "f letters." These classifications ultimately allowed treated metal shredder waste to be handled, transported, and disposed of as non-hazardous waste in class III landfills (i.e., solid (nonhazardous) waste landfills).
Legislation to address impacts of metal shredding facilities: In 2014, Senator Jerry Hill introduced SB 1249 (Chapter 756), based in part on concerns about metal shredder safety due to recent fires at metal shredding facilities in his district, but also in response to the historic concerns about metal shredding facilities and their potential impact on the environment. The intent of the bill was that the conditional nonhazardous waste classifications, as documented through the historical "f letters," be revoked and that metal shredding facilities be thoroughly evaluated and regulated to ensure adequate protection of human health and the environment. SB 1249 was signed by the Governor and authorized DTSC to develop alternative management standards (different from a hazardous waste facility permit) if, after a comprehensive evaluation of metal shredding facilities, DTSC determined that alternative management standards were warranted.
DTSC's implementation of SB 1249: DTSC's implementation of SB 1249 included: conducting a comprehensive evaluation of metal shredding facilities and metal shredder waste; determining if alternative management standards specific to metal shredding facilities could be developed to ensure that the management, treatment, and disposal practices related to metal shredder waste are protective of human health and the environment; preparing an analysis of activities to which the alternative standards will apply, made available to the public before any regulations were adopted; and, adopting emergency regulations establishing a fee schedule to reimburse DTSC's costs for the evaluation, analysis, and regulatory development for metal shredding facilities.
As part of this implementation, in January 2015, DTSC developed a three-year work plan to implement SB 1249. The work plan includes development of a treatability study on metal shredder wastes to demonstrate the highest level of treatment that can be achieved with current technology, and an assessment of the potential for treated or untreated metal shredder waste to migrate off-site and impact residents or business occupants in the areas surrounding metal shredding facilities and landfills that accept metal shredder waste.
As part of the work plan, DTSC approved air monitoring summary reports for metal shredding facilities located in Bakersfield, Redwood City, and Terminal Island. Air sampling was conducted at the facilities during October 2016 to assess the potential for offsite emissions associated with the metal shredding operations.
DTSC's evaluation of metal shredding facilities: As part of SB 1249, DTSC conducted a multi-year evaluation of metal shredding facilities, issuing a draft report in 2018 and then issuing a final report in August of 2021 titled, "Evaluation and Analysis of Metal Shredding Facilities and Metal Shredder Wastes." According to the final report:
"The Department of Toxic Substances Control (DTSC) is pleased to present this Evaluation and Analysis of Metal Shredding Facilities and Metal Shredder Wastes (Final Report). This Final Report incorporates feedback received after initial posting of the Draft Report in 2018, summarizes recent enforcement actions taken since 2018, provides an analysis of the DTSC-directed treatability study, incorporates information learned by DTSC during the course of its community workshops and stakeholder consultation group meetings, and revises terminology where appropriate. DTSC reviewed hazardous waste management activities, current regulatory environmental oversight, and the history of releases, contamination, and enforcement actions at metal shredding facilities in California.
Additionally, DTSC coordinated with metal shredding facilities on a treatability study to identify the highest level of treatment that could be achieved to stabilize metals of concern on metal shredder waste with current technology. DTSC also reviewed the current disposal practices of chemically treated metal shredder waste at municipal solid waste landfills to identify the potential for migration of contaminants to groundwater, surface water, and the air. The study team found numerous examples of accidents, improper storage of hazardous wastes, soil contamination, and releases of hazardous wastes that impacted the environment and surrounding communities at metal shredding facilities.
DTSC and other agencies have taken several enforcement actions against metal shredding facilities in response to these types of incidents. DTSC’s efforts have allowed for it to gain a more thorough understanding of metal shredder operations, as well as of the ambiguities within the existing regulatory framework under which metal recyclers, including shredding facilities, have historically operated. Based on this evaluation, DTSC has determined that the point of generation of hazardous waste is at the shredder itself, meaning that various downstream activities performed at the facilities would be subject to the Hazardous Waste Control Law. Under the Hazardous Waste Control Law, entities who conduct hazardous waste treatment, storage, or disposal are required to apply for and receive a form of authorization from DTSC in order to operate. Based on the results of its evaluation and DTSC's updated understanding of these activities, metal shredding facilities would require a form of authorization from DTSC to continue to operate in the same manner.
DTSC’s analysis demonstrates that the disposal of chemically treated metal shredder residue as nonhazardous waste in municipal solid waste landfills, including its use as alternative daily cover, has not resulted in harm to human health or safety or to the environment, based on the limited data available to DTSC. Additionally, the analysis demonstrates that chemically treated metal shredder residue has not contributed to the solubilization and migration of heavy metals from solid waste landfills via leaching into soil or groundwater, surface water contamination, or windborne dispersion. Thus, while various protections and requirements related to the management of chemically treated metal shredder residue (CTMSR) during its transportation to landfills may need to be developed to ensure the safety of human health and the environment, DTSC has concluded that it is not necessary that metal shredder residue that has been appropriately chemically treated, managed, and transported, to be disposed of as a hazardous waste to prevent or mitigate potential hazards to human health or safety or to the environment."
Implementation of SB 673 (Lara, Chapter 611, Statutes of 2015): SB 673 was signed into law in 2015, creating an opportunity for DTSC to improve the permit process for hazardous waste facilities. Implementation of SB 673 provided DTSC with an opportunity to address long standing environmental justice concerns stemming from the location, operation, and expansion of hazardous waste facilities. The provisions of SB 673 provided for stronger permit criteria to further protect communities and consider "the vulnerability of, and existing health risks, to nearby populations" when issuing new or modified permits and permit renewals. DTSC's efforts to implement SB 673 included dividing the regulations into two tracts. One tract has been implemented, and it deals with incorporating past violations into permitting decisions. This is also known as the violation scoring procedure. The remaining piece of SB 673 has yet to be implemented and requires DTSC to evaluate community vulnerability, health risks, and setback distances into its permitting processes.
This bill: SB 811 requires DTSC to evaluate how to incorporate the part of SB 673 dealing with community vulnerability and minimum setbacks distances into its permitting of metal shredding facilities. However, SB 811 does not include, and some stakeholders have requested that it include, DTSC's violation scoring procedure in its permitting of metal shredding facilities.
Recent legislation dealing with metal shredding facilities: Two years ago, the legislature enacted and the Governor signed AB 2851 (Bonta, Chapter 743, Statutes of 2024), which requires DTSC, in consultation with local air pollution control districts and air quality management districts, to develop and implement facility-wide fence-line air quality monitoring at metal shredding facilities. It is important to note that the funding for AB 2851 comes from fees from metal shredders detailed under the HWCL. While this bill strikes that section dealing with metal shredder fees in the HWCL, it reenacts the same fee authority in a new section in SB 811. Therefore, there is no impact to the funding of AB 2851 from this bill.
Last year, SB 404 (Caballero), which is nearly identical to SB 811, was vetoed by the Governor. In his veto message the Governor stated:
"I support the author's intent to create a uniform structure for permitting metal shredding facilities in California. These facilities are critical to maintaining supply chain stability, recycling millions of end-of-life vehicles, household appliances, and other metallic items produced, used, and discarded annually in California. Unless recycled, these metal materials would overwhelm available landfill capacity, creating a massive accumulation of damaged and abandoned cars, appliances, and other items.
However, this bill lacks clear definitions regarding the materials processed at these facilities, including what "hazardous waste" requirements are applicable. Without this clarity, this bill is not as protective, places a significant burden on DTSC, and cannot be successfully implemented.
I encourage the author to work closely with DTSC and interested parties to remedy this issue, as well as ensure that any future legislation requires metal shredding facilities operate, and be permitted to operate, in a health-protective manner."
According to the author of SB 811 and the sponsors of the bill, they did have conversations with DTSC and as a result have amended SB 811 to incorporate both technical changes and changes to further clarify that DTSC can exercise its enforcement authority under the HWCL for specific violations of SB 811.
Key details contained in SB 811: This bill creates an entirely new permitting structure for metal shredding facilities. While there are aspects of this bill that are similar to or consistent with the requirements for hazardous waste facilities under the HWCL, the permits under this bill are completely new in the state. Below are some key aspects contained within SB 811:
1) Clarifies that this bill does not limit the authority of a local air pollution control district, air quality management district, Unified Program Agency, or a local environmental health department that is not a Unified Program Agency.
2) Prohibits, unless otherwise specified, a metal shredding facility from operating in California, unless it has a permit issued by DTSC.
3) Requires DTSC to evaluate how to apply, to metal shredding facilities, its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations, as described in existing law (HSC § 25200.21(b-c))
4) Requires DTSC to determine, on the basis of substantial evidence, that operation of the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities, before approving or denying a permit under this bill.
5) Requires DTSC to impose any additional facility-specific conditions that are necessary to ensure compliance with this bill and for the protection of human health and the environment.
6) Requires the metal shredding facility, before they submit a permit application to DTSC, to hold at least one public meeting, approved by DTSC, to inform the community about the metal shredding facility and any potential impacts to nearby communities.
7) Authorizes a metal shredding facility to make specified physical or operational changes to the metal shredding facility without seeking prior approval from DTSC.
8) Clarifies that metal shredder aggregate, including light fibrous material, that is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, shall be subject to regulation as hazardous waste under the HWCL.
9) Requires the metal shredding facility, within one year of the effective date of this bill, to conduct an on-site investigation to determine if there have been any releases to the environment. Requires the facility to conduct cleanup of any releases that pose a significant threat to human health or the environment. Clarifies that DTSC still has its authority under the HWCL to order any investigation and cleanup as necessary.
10) Requires the metal shredding facility to establish an effective means of providing public notice to members of the surrounding community upon the occurrence of a fire or other incident that poses a threat to human health or the environment outside of the facility.
11) Requires the owner or operator to provide a financial assurance mechanism for closure of the metal shredding facility and for bodily injury and property damage. (note: financial assurance is a mechanism under the HWCL that allows DTSC to access funding, provided by the facility, to safely close the facility or perform other cleanup as necessary, in the event the facility was no longer operating or bankrupt)
12) Clarifies that DTSC can use any authority it has under the HWCL to enforce the provisions of this bill.
13) Authorizes DTSC to order the temporary shutdown of shredding operations or prohibit the receipt of shredder feedstock under certain circumstances.
14) Authorizes DTSC to deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility based on at least one of the following:
a) Noncompliance with a condition of the applicable permit that results in a significant threat to human health or the environment;
b) An owner or operator’s failure in the application or during the approval process to disclose fully all relevant facts or a misrepresentation of any relevant fact at any time;
c) A determination, supported by substantial evidence, that the permitted activity poses a danger to human health or the environment that can only be addressed by permit denial, modification, suspension, or revocation; or,
d) Any cause specified in HSC § 25186 under the HWCL. (in short: this means a permit could be denied, suspended, etc., if the facility violates any one of the state and federal environmental laws and regulations listed in this referenced code section).
15) Clarifies that an approval of an application for an existing or new metal shredding facility is subject to the provisions of the California Environmental Quality Act.
Stakeholder engagement and recent amendments to this bill: Over the course of the legislative process, this bill (and SB 404) has undergone significant revisions pursuant to stakeholder conversations and engagement among the Author, sponsors, and opposition. Amendments taken have intended to address the following issues: preservation of authority of local agencies (Certified Unified Program Agencies (CUPAs), local health officers, and public attorneys); enhancing permit requirements to reduce impacts to communities; improve public participation in the permitting of metal shredding facilities; issues specific to smaller metal shredders; improvements to the prevention of fires at metal shredding facilities; more specific enforcement options; clarifying that the fees paid by metal shredders under this bill will also be available to implement AB 2851; and provisions to deal with the prevention of off-site releases.
However, even though the bill has been substantially amended as mentioned above, various stakeholders remain opposed to the bill.
SB 811 compared to a hazardous waste facility permit: There have been significant stakeholder discussions regarding the requirements under SB 811 and the requirements for a hazardous waste facility. There are similarities in the requirements under this bill and for a hazardous waste facility permit. At a very high level, both SB 811 and a hazardous waste facility permit require the following:
1) A closure plan and a cost estimate for closure;
2) Evidence of financial assurance for the closure plan;
3) An Inventory management plan;
4) A housekeeping plan;
5) A training plan;
6) Facility security plan;
7) An inspection plan;
8) A preparedness and prevention plan;
9) A contingency plan;
10) An authorization to make operational changes without DTSC approval under certain circumstances; and,
11) A preliminary endangerment assessment (to assess possible onsite contamination).
In addition, both SB 811 and a hazardous waste facility permit authorize DTSC to make any additional changes necessary to the permit to protect human health and safety and authorize DTSC to deny, suspend, or revoke the permit.
Requirements on metal shredders today versus under SB 811: While there has been significant discussion around how metal shredders would be regulated under the HWCL, it's important to note that there is a significant difference in how these metal shredding facilities are currently regulated versus under SB 811. Currently, metal shredding facilities are not permitted by DTSC and are regulated mainly as a generator of hazardous waste. This means that as a business they generate and manage hazardous waste and are required to manage the hazardous waste under the conditions of the HWCL. In addition, as noted earlier, DTSC issued these facilities "f" letters authorizing them to treat the metal shredder residue. It's safe to say that over the past 30-40 years there hasn't been consistent regulation of metal shredder facilities by the state. SB 811 would eliminate that confusion and would establish a permit for metal shredding facilities (outside of the HWCL). The conditions under SB 811, as noted above, and cited in the earlier part of this analysis are largely not required of these facilities today. Currently these facilities are not required to have a closure plan, cost estimate for closure, financial assurance mechanism to cover the closure cost, training or inspection plan, fire prevention plan, or an assessment of potential onsite contamination. SB 811 changes that and imposes a consistent set of permit requirements, overseen by DTSC, with the goal that these facilities operate safely and do not negatively impact their surrounding community.
Recent DTSC enforcement action against a metal shredder: On June 17, 2026, DTSC announced it had secured a court‑approved settlement with Radius Recycling, Inc. for violations identified during multiple inspections and fire‑related investigations at the company’s West Oakland metal shredding facility. Radius operated under the name Schnitzer Steel Industries, Inc. until July 2023. Radius agreed to pay $1.5 million in penalties and costs, including $510,000 directed to community programs that protect the environment and public health.
The settlement addresses 21 violations of the HWCL, including violations stemming from fires in June 2018, June 2020, and August 2023, plus violations discovered during DTSC inspections in May 2022, November 2023, and April 2025.
Under the settlement, Radius will pay:
1) $510,000 toward Supplemental Environmental Projects (SEPs) to support the cleanup of local illegal dumping sites, promote safe consumption of fish, support safe disposal of needles, and encourage the use of refillable propane cylinders;
2) $480,000 to reimburse DTSC’s investigative and enforcement costs; and,
3) $510,000 as a civil penalty under the HWCL.
Violations of the HWCL addressed in the settlement include:
1) Failure to operate the facility in a manner that minimizes the risk of fire or hazardous waste release;
2) Failure to use a registered hazardous waste transporter;
3) Failure to obtain authorization to treat hazardous waste;
4) Improper storage of hazardous waste; and,
5) Failure to properly notify the California Office of Emergency Services following a fire.
According to DTSC, "the settlement requires Radius to implement measures that exceed existing regulatory requirements to prevent future fires and protect the West Oakland community. These measures include installation of Forward‑Looking Infrared cameras to detect hot spots in scrap piles. Additionally, the company must follow the City of Oakland Fire Prevention and Response Plan and Emissions Minimization Plan, notifying DTSC within two hours of any major fire and provide alerts to nearby residents." DTSC notes that this settlement does not cover violations from the March 11, 2026 fire, which DTSC is still investigating.
One note, in addition to enforcing the HWCL, SB 811 would add a new tool to DTSC's enforcement toolbox for metal shredding facilities. SB 811 allows, under specified conditions, DTSC to suspend the operation of a metal shredding facility.– DTSC does not have that specific authority for metal shredding facilities under current law.
This bill: SB 811 creates a regulatory structure in state law for metal shredding facilities. There are currently ten metal shredding facilities in the state, some operating under regulatory authorization from the 1980s and 1990s. These facilities are an important piece of the metal recycling infrastructure in California. However, having one clear regulatory structure for all metal shredding facilities in the state makes sense. Having clear rules will be helpful for state and local regulators and metal shredding facilities, and will help set the regulatory standard for future metal shredding facilities in the state.
Arguments in support: According to the California Metal Recyclers Coalition:
"Metal shredding facilities provide an essential public service to many sectors of the economy, including state and municipal governments, California businesses and residents by providing a safe, reliable and environmentally responsible means of recycling the vast quantities of recyclable metal-containing materials that are generated in the state every day. These facilities successfully recycle millions of end-of-life vehicles, trucks, busses, household appliances, steel beams, rebar and other metallic construction materials, and thousands of other items ranging in size from a backyard barbeque to sections of the old San Francisco-Oakland Bay Bridge. More than ever, these facilities provide the only feasible and cost-effective means of dealing with the huge number of burned vehicles, household appliances and other metal items that are damaged or destroyed by the wildfires which are sweeping though our communities with distressing frequency.
SB 811 is virtually identical to SB 404 (Caballero), which was passed by the Legislature last
year with only one 'no' vote. Unfortunately, the Governor vetoed the bill due to an
implementation issue that could not be resolved prior to passage due to time constraints.
However, the Governor’s veto message expressed his desire that this issue be resolved so that a new bill could be signed to ensure that these critical facilities may continue to operate in
California.
SB 811 accomplishes this goal. SB 811 is identical to SB 404 with the exception of very minor amendments that resolve the implementation issues referred to in the Governor’s veto message. These amendments make clear that the requirements of the bill apply to both the metal processing operations and the materials processed by those operations, and that DTSC retains authority under the Hazardous Waste Control Law to pursue enforcement against metal shredding facilities in certain prescribed circumstances. The Metal Recyclers Coalition worked with the Department of Toxic Substances Control (DTSC) to ensure that the proposed amendments are clear and achieve the necessary clarifications of the bill’s language.
SB 811 solves a problem that has threatened the economic viability of metal shredding facilities for almost a decade—the lack of clarity around how these critical facilities should be regulated. In the same fashion as SB 404, SB 811 would establish a new regulatory program in the Health and Safety Code devoted specifically to this industry, that would be administered by DTSC. The industry has worked proactively with DTSC to address issues raised by the agency and to ensure the safe operation of these facilities. Significant operational improvements have been achieved at metal shredding facilities over the past few years, and the regulatory framework established by SB 811 will further ensure that these important facilities continue to operate safely and in an environmentally protective manner."
Arguments in opposition: According to a coalition of environmental and environmental justice organizations:
"The undersigned organizations respectfully oppose Senate Bill 811 by Senator Caballero. The bill’s effort to exclude metal shredders from California’s hazardous waste laws while providing an inadequate replacement puts communities and the environment at risk. Our organizations raised our concerns in opposition to SB 404, which was vetoed last session but has been revived as SB 811. Despite the minor amendments from SB 404, this bill still fails to address significant concerns and should be rejected.
The materials managed at metal shredding facilities are hazardous waste and must be regulated as such under California’s hazardous waste laws. Instead of SB 811’s overly complicated approach, California should regulate metal shredding facilities under the existing hazardous waste framework, including by promptly requiring the facilities to obtain hazardous waste permits with conditions necessary to protect human health and the environment. The Department of Toxic Substances Control (DTSC) should then be directed to develop additional requirements, within the existing hazardous waste legal framework, tailored to address the ongoing problems we’ve seen at metal shredding facilities—including fires and dispersal of heavy metals into surrounding communities.
DTSC already struggles to manage its existing regulatory responsibilities. Carving metal shredding facilities out of the hazardous waste framework to create a separate permitting regime for the metal shredding industry will stretch DTSC even thinner and needlessly tax its capacity to implement the hazardous waste program. The focus instead should be on ensuring DTSC is providing regulatory oversight and ensuring protection of human health and the environment.
We agree with the need to address the threats posed by metal shredding facilities to communities, but this bill as written moves in the wrong direction."
According to Universal Service Recycling, Inc. (Universal), Pacific Auto Recycling Center (PARC), and Kramar’s Iron & Metal Co. (Kramar):
"Universal Service Recycling, Inc. (Universal), Pacific Auto Recycling Center (PARC), and Kramar's Iron & Metal Co. (Kramar), three small businesses that have shredded and recycled metals in California for decades, are regrettably opposed to SB 811 unless it is amended to eliminate the duplicative, overly burdensome, and costly requirements it would impose on our businesses.
As the bill correctly observes, metal shredding and recycling is a critical circular economy and environmental protection measure in California. Small metal recyclers like Universal, PARC, and Kramar assist in the statewide recovery of valuable secondary metals, separating and bundling them into compact and transportable bales that can be sold as raw materials for manufacturing new metal products, such as rebar. These companies also play an important role in the cleanup process that follows natural disasters, such as the catastrophic wildfires that impacted Los Angeles communities earlier this year and also support local economies in disadvantaged communities for the many jobbers who collect and sell scrap metal.
Since small metal recyclers do not chemically treat metal shredder residue (MSR), they are already regulated by the Department of Toxic Substances Control (DTSC), and all their generation and handling of MSR must comply with hazardous waste generator requirements found in Title 22 of the California Code of Regulations.
Accordingly, we request that SB 811 be amended to clearly distinguish between the two pathways for proper regulation of metal shredder residue. Under our proposed amendments, the small metal recyclers that do not chemically treat metal shredder residue and that have obtained all necessary permits and authorizations from the myriad agencies with jurisdiction over different facets of metal shredding operations, would continue to be regulated by DTSC under DTSC's own hazardous waste generator regulations. As such, these facilities would not need to obtain the permit contemplated in SB 811. The SB 811 permitting process would be the primary means of authorizing and regulating the chemical treatment of metal shredder residue and would also serve as the backstop for facilities that do not have all the necessary regulatory mechanisms in place."
According to California Association of Environmental Health Administrators (CAEHA), the CUPA Forum Board (CFB), and the Health Officers Association of California, writing in an opposed-unless-amended position:
"SB 811 codifies metal shredder residue and chemically treated metal shredder residue as non-hazardous waste. DTSC’s analytical results released in 2021 clearly demonstrate that metal shredder residues remain hazardous waste even after treatment. The public’s health is endangered when we ignore the hazardous nature of residue which is produced by locations often located in close proximity to low-income communities.
Emergencies start and end locally. California communities are burdened by fires at metal shredding facilities (including a recent fire at Radius Recycling’s Oakland’s facility on March 11, 2026) which release hazardous waste constituents into the local community, endangering the public’s health. SB 811 creates an exemption that allows the industry to treat hazardous waste without meaningful local oversight.
SB 811 sets an unwise precedent for using code to exempt a specific waste product from the hazardous waste regulatory process. Statutory provisions for the establishment of alternative management standards for metal shredder waste were enacted in 2014 (SB 1249, Chapter 756) and amended in 2025 (AB 2851, chapter 743). The Department of Toxic Substances Control (DTSC) was provided with the opportunity to adopt regulations but chose not to, instead issuing an interpretive letter, which was recently rescinded."
Related legislation:
1) SB 404 (Caballero, 2025). Requires the owner or operator of a metal shredding facility to obtain a permit from DTSC. Prohibits a metal shredding facility from operating in the state without a permit. Includes within the permit: requirements for managing various wastes within and leaving the facility, measures to prevent fires; and measures to reduce impacts to communities near the facility. Provides that local and state regulators retain enforcement authority with respect to metal shredding facilities, as that authority exists under current law. This bill was vetoed by Governor Gavin Newsom.
2) SB 1234 (Allen, 2024). Would have established permitting requirements for new and existing metal shredding facilities. Would have required an owner or operator of an existing metal shredding facility, within 120 days after the effective date of this bill, to submit to the DTSC, for review and approval, specified information that is required for a metal shredding facility permit. This bill was held on the suspense file in the Assembly Appropriations Committee.
3) AB 2851 (Bonta, Chapter 743, Statutes of 2024). Requires DTSC, in consultation with local air pollution control districts and air quality management districts, to develop and implement facility-wide fence-line air quality monitoring at metal shredding facilities.
4) SB 158 (Committee on Budget and Fiscal Review, Chapter 73, Statutes of 2021). Enacted several policy reforms to the programs overseen by DTSC, stabilized DTSC's funding, and created the Board.
5) SB 673 (Lara, Chapter 611, Statutes of 2015). Revised DTSC's permitting process and public participation requirements for hazardous waste facilities.
6) SB 1249 (Hill, Chapter 756, Statutes of 2014). Authorizes DTSC to adopt regulations establishing alternative management standards for hazardous waste management activities at metal shredding facilities until January 1, 2018.
7) SB 524 (Correa, Chapter 716, Statutes of 2009). As heard by the Assembly Environmental Safety and Toxic Materials Committee: would have prohibited DTSC from altering the current regulatory status of auto shredder residue without first considering factors considered by an auto shredder residue working group. This bill was subsequently amended into an unrelated subject and signed by the Governor.
REGISTERED SUPPORT / OPPOSITION:
Support
Beacon House Association of San Pedro
Boys & Girls Clubs of the Los Angeles Harbor
California Council for Environmental & Economic Balance
California Hispanic Chambers of Commerce
California Professional Firefighters
California State Association of Electrical Workers
California State Pipe Trades Council
Central City Association of Los Angeles
City of Los Angeles Councilmember Tim McOsker
Colton Chamber of Commerce
Councilmember John Echavarria
Ecology Recycling Services
Garden Grove Chamber of Commerce
Grand Vision Foundation
Harbor Association of Industry and Commerce
Kern County Hispanic Chamber of Commerce
Latino Caucus of California Counties
Metal Recycling Coalition
Peace Officers Research Association of California
Port of Los Angeles
Recology
Redondo Beach Chamber of Commerce
Republic Services
Resource Recovery Coalition of California
San Joaquin County District Attorney's Office
San Joaquin County Sheriff - Public Administrator Patrick Withrow
ShareFest Community Development
South Bay Association of Chambers of Commerce
South Colton Diversity Committee
State of California Auto Dismantlers Association
Strength Based Community Change
Thousand Palms Chamber of Commerce
Western States Council Sheet Metal, Air, Rail and Transportation
Opposition
1000 Grandmothers for Future Generations
350 Bay Area Action
350 Humboldt
Action Now
Active San Gabriel Valley
Alameda County District Attorney's Office
Alameda County Office of Education
Antelope Valley Economic Development and Growth Enterprise
Asian Industry Business to Business
Bay Area System Change Not Climate Change
BizFed Central Valley
Business Council San Joaquin County
C & M Metals INC
California African American Chamber of Commerce
California Association of Environmental Health Administrators
California Coastkeeper Alliance
California Communities Against Toxics
California CUPA Forum
California Environmental Voters
California Safe Schools
California Small Business Association
Center for Race, Poverty, and the Environment
Central Valley Business Federation
City of Oakland
Clean Air Coalition of North Whittier and Avocado Heights
Clean Water Action
Cleanearth4kids.org
Coalition for Clean Air
Comite Civico Del Valle
Comite Pro Uno
Communities for a Better Environment
County of Alameda
County of San Mateo Board of Supervisors
Del Amo Action Committee
EarthJustice
East Yard Communities for Environmental Justice
Facts: Families Advocating for Chemical & Toxics Safety
Fresnans Against Fracking
Greater Stockton Chamber of Commerce
GreenAction for Health and Environmental Justice
Health Officers Association of California
Kramar's Iron and Metal Co.
Lincoln Heights Community Coalition
Los Angeles Unified School District
Modesto Chamber of Commerce
New Genesis Housing Development Corporation
National Federation of Independent Business
National Resources Defense Council
Natural Resources Defense Council
Oakland Athletics
Oakland Unified School District
Pacific Auto Recycling Center
Philippine Action Group for the Environment
Placer Earth Care Action
Resource Renewal Institute
Richmond Shoreline Alliance
San Bernardino County
San Francisco Baykeeper
Services Recycling, INC.
Sierra Club California
Valley Industry and Commerce Association
West Berkeley Alliance for Clean Air and Safe Jobs
West Oakland Environmental Indicators Project
Analysis Prepared by: Josh Tooker / E.S. & T.M. / (916) 319-3965
Date of Hearing: June 16, 2026
ASSEMBLY COMMITTEE ON ENVIRONMENTAL SAFETY AND TOXIC MATERIALS
Damon Connolly, Chair
SBPCA Bill Id:SB 811
Author:(Caballero) – As Amended Ver:January 22, 2026
SENATE VOTE: 40-0
SUBJECT: Hazardous materials: metal shredding facilities
SUMMARY: Requires the owner or operator of a metal shredding facility to obtain a permit from the Department of Toxic Substances Control (DTSC). Prohibits a metal shredding facility from operating in the state without a permit. Includes within the permit: requirements for managing various wastes within and leaving the facility, measures to prevent fires, and measures to reduce impacts to communities near the facility. Provides that local and state regulators retain enforcement authority with respect to metal shredding facilities, as that authority exists under current law. Specifically, this bill:
1) Defines "chemically treated metal shredder residue" or "CTMSR" as the waste generated from the processing of shredded metallic materials, which may include, but is not limited to, end-of-life vehicles, appliances, and other metal-containing items, by a metal shredding facility where recoverable ferrous or nonferrous metals have been removed and the remaining metal shredder residue has been treated by a waste stabilization process, as described.
2) Defines "existing metal shredding facility" as a metal shredding facility that is conducting metal shredding and metal processing operations as of the date that the act adding this bill is signed into law by the Governor.
3) Defines "feedstock" as material received by a metal shredding facility before shredding and processing, including, but not limited to, end-of-life vehicles, household appliances, or other forms of light gauge metal suitable for processing in a metal shredder.
4) Defines "light fibrous material" as a fibrous mixture of nonmetallic materials, including, but not limited to, synthetic fabric and carpet fibers, and entrained metallic particles, often representing the lightest fraction of metal shredder aggregate produced from the shredding of end-of-life vehicles and other metallic items, which is susceptible to dispersal into the environment.
5) Defines "metal processing operations" as the stockpiling and handling of metal shredder aggregate; the operations undertaken to separate, sort, and remove ferrous or nonferrous scrap metal from metal shredder aggregate; and the treatment and storage of metal shredder residue. Metal processing operations do not include shredding, crushing, baling, shearing, cutting, or other metal recycling operations unrelated to the handling of metal shredder aggregate.
6) Defines "metal shredder aggregate" as the mixture of shredded metallic and nonmetallic materials that is produced by the shredding of metallic feedstock and that is subsequently processed for the purpose of separating, sorting, and removing ferrous metals, nonferrous metals, or other recyclable commodities from nonrecyclable materials. Metal shredder aggregate does not include metals that have been removed from metal shredder aggregate, or metal shredder residue.
7) Provides that metal shredder aggregate is an in-process material and is not a waste or a hazardous waste.
8) Defines "metal shredder residue" as waste comprising shredded plastics, rubber, glass, foam, fabric, carpet, wood, dirt, or other debris that remains after recoverable ferrous and nonferrous metals or other recyclable commodities have been separated and removed from metal shredder aggregate. Metal shredder residue does not include chemically treated metal shredder residue.
9) Defines "metal shredding facility" as the entire site under the control of the owner or operator of a facility that uses a stationary or mobile shredder, such as a hammer mill or other shredding technique, to process end-of-life vehicles, appliances, or other metallic feedstock materials in order to facilitate the separation, sorting, or removal of recoverable ferrous or nonferrous metals from nonrecyclable materials. "Metal shredding facility" does not include a feeder yard or other scrap metal recycling facility that operates a metal crusher, a metal shear, or a metal baler if that facility does not conduct metal shredding operations.
10) Defines "new metal shredding facility" as a metal shredding facility that had not commenced metal shredding and metal processing operations as of the effective date of this bill.
11) Exempts the following facilities from regulation under the requirements of this bill:
a) Facilities that shred only electronic waste (e-waste);
b) Facilities that shred wood or wood products that may contain ancillary metal components, including, but not limited to, screws, bolts, metal ties, and metal strapping;
c) Facilities that shred only automotive tires;
d) A feeder yard or other scrap metal recycling facility that operates a metal crusher, metal shear, or metal baler if that facility does not conduct metal shredding operations; and,
e) A metal shredding facility that processes exclusively nonferrous metals that do not contain any nonmetallic materials and whose operations do not produce any metal shredder aggregate or result in the generation of metal shredder residue.
12) Provides that metal shredding facilities that are subject to regulation and comply with the requirements of this bill are not hazardous waste facilities. However, further provides that this bill does not alter or override the authority of DTSC or a Unified Program Agency, to regulate ancillary hazardous waste generated at a metal shredding facility.
13) Provides that this bill does not limit the authority of a local air pollution control district, air quality management district, Unified Program Agency, or local environmental health department that is not a Unified Program Agency.
14) Authorizes DTSC to adopt regulations as necessary to implement this bill, and thereafter to update and revise the regulations from time to time, consistent with the requirements of this bill.
15) Requires DTSC to adopt regulations relating to the imposition of fees on metal shredding facilities.
16) Prohibits, unless otherwise specified, a metal shredding facility from operating in California, unless it has a permit issued by DTSC.
17) Authorizes, on and after the effective date, an existing metal shredding facility operating in compliance with the requirements of this bill to continue to operate, pending final action on a permit application, as specified in this bill. Requires, without exception, the facility to have developed and continuously implement a fire prevention, detection, and response plan and comply with the limitations on pile size and duration set forth in this bill. Provides that nothing herein shall prevent DTSC from taking enforcement action before issuance of a final permit.
18) Requires any permit approved by DTSC pursuant to this bill to include a reference to all permits issued to the facility by other environmental regulatory agencies. Requires DTSC to evaluate how to apply, to metal shredding facilities, its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations as described in existing law (Health and Safety Code (HSC) § 25200.21(b-c))
19) Requires DTSC to determine, on the basis of substantial evidence, that operation of the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities, before taking final action to issue a permit for a metal shredding facility under this bill.
20) Requires, within 30 days of the effective date of this bill, the owner or operator of an existing metal shredding facility to submit a notice of intent to apply for a permit. Thereafter, requires the owner or operator of an existing metal shredding facility to apply for a permit pursuant to this bill no later than six months following submittal of the notice of intent and to provide all of the following information to DTSC:
a) A description of the metal processing operations conducted at the metal shredding facility, including all equipment used for this purpose;
b) A metal shredding facility inspection plan, including, without limitation, inspection of the area surrounding the hammer mill and all downstream metal processing equipment where light fibrous material is likely to accumulate;
c) A plan for the prevention, detection, and response to fires;
d) A closure plan;
e) A metal shredding facility housekeeping plan that includes, but is not limited to, daily cleanup of light fibrous material that is susceptible to dispersal beyond the hammer mill;
f) An inventory management plan that includes procedures that will be implemented to ensure compliance with the limitations on pile size and duration set forth in this bill;
g) Evidence of financial assurance for closure and third-party liability consistent with the requirements of existing regulations;
h) A plan describing any offsite or out-of-state transportation and processing of metal shredder aggregate and metal shredder residue, including, but not limited to, the estimated amount of material that is transported, the identity and federal Standard Industrial Classification code of the receiving facility, the estimated amounts of metals that are recovered from the material that is transported offsite, the required insurance, and any other information requested by DTSC to evaluate whether metal recycling operations are being conducted at the receiving facility; and,
i) A compliance plan and schedule if required pursuant to the requirements of this bill.
21) Requires DTSC to review the permit application as expeditiously as possible and take final action to approve, modify, or deny the application within three years after the application has been determined to be complete. Provides that failure of the owner or operator to provide a complete permit application within one year shall be grounds for DTSC to initiate denial of the application, subject to specified conditions.
22) Requires DTSC to impose any additional facility-specific conditions that are necessary to ensure compliance with this bill and for the protection of human health and the environment.
23) Requires DTSC, in considering an application for a metal shredding facility permit submitted pursuant to this bill, and the specific terms and conditions to be included in the permit, to consider the site-specific aspects of the metal shredding facility, including, but not limited to:
a) The nature of the surrounding community and environment;
b) The results of any community-specific assessment;
c) The facility size, location, and configuration;
d) The equipment, enclosures, and infrastructure;
e) The specific metal processing operations conducted at the metal shredding facility, including types of feedstock and annual throughput; and,
f) Other relevant site-specific characteristics.
24) Requires the owner or operator of a new metal shredding facility to submit an application to DTSC for a permit and prohibits the owner or operator from commencing operations at the new metal shredding facility until DTSC has approved a permit.
25) Requires DTSC, in reviewing a facility's application for permit renewal, to consider the compliance history of the metal shredding facility, including the requirements of any permit issued by any other agency.
26) Requires, before the submission of a permit application or application for permit renewal for a metal shredding facility, the applicant to hold at least one public meeting, or other community engagement activity approved by DTSC, to inform the community of metal processing activities and any potential impacts to nearby communities and to solicit questions and input from the public.
27) Authorizes an owner or operator of a metal shredding facility that has submitted a permit application and is unable to comply with all the requirements of this bill as of the effective date to continue to operate, pending DTSC's review and approval or denial of the permit application, subject to all of the following requirements:
a) The owner or operator identifies in its application each provision of this bill that the facility is unable to immediately comply with and has developed and implemented a plan and schedule approved by DTSC for achieving compliance with the provisions of this bill;
b) On or before the effective date, the owner or operator has developed and implements a written plan for the prevention, detection, and response to fires that meets the requirements of this bill. Requires that a copy of the fire response plan be submitted to DTSC within seven days of the effective date, and subject to review and approval of DTSC after consultation with the facility and the local fire department of the jurisdiction where the facility is located;
c) On or before the effective date, the owner or operator complies with the limitations on pile size and duration set forth in this bill;
d) The owner or operator initiates, diligently pursues, and implements financial assurance for closure and third-party liability as required pursuant to this bill, including, but not limited to, both of the following:
i) The owner or operator initiates and diligently pursues to completion a preliminary endangerment assessment, as required pursuant to this bill, and initiates any required actions identified in the preliminary endangerment assessment; and
ii) The owner or operator, at a minimum, maintains all existing practices and controls that are in effect or otherwise required by DTSC, a Unified Program Agency, or a local environmental health department on or before the effective date, that are designed to prevent the possibility of any unplanned sudden or non-sudden release of in-process materials; hazardous waste; metal shredder residue; or, chemically treated metal shredder residue, into air, soil, or surface water that could threaten human health or the environment; and,
e) The owner or operator shall be subject to any interim measures or controls established by DTSC during consideration of the permit application that are necessary for the protection of human health and the environment.
28) Requires the owner or operator of a metal shredding facility to operate the metal shredding facility in accordance with all of the following requirements:
a) The metal shredding facility shall be maintained and operated to minimize the possibility of a fire, explosion, or any unplanned sudden or non-sudden release of in-process materials or components thereof, including metal shredder aggregate and light fibrous material, into air, soil, or surface water that could threaten human health or the environment by implementing all reasonable and feasible operational or engineering methods of control, including, but not limited to, technologies or equipment, taking into consideration the size, configuration, and location of the facility, the characteristics of the materials handled, and other relevant factors;
b) The owner or operator of the metal shredding facility shall develop and follow an inbound source control policy designed to prevent the shredding of any of the following materials or wastes at the facility:
i) Federal Resources Conservation and Recovery Act (RCRA) hazardous waste, and non-RCRA hazardous waste;
ii) Asbestos and asbestos-containing materials, except incidental asbestos-containing material that may be contained inside equipment and is not visible upon inspection;
iii) Radioactive materials;
iv) Petroleum-based wastes, including, but not limited to, used oil, gasoline, and diesel, but not including non-free-flowing residual quantities of such wastes contained in depolluted vehicles or appliances;
v) Polychlorinated biphenyls (PCB) materials and wastes, including, but not limited to, capacitors, electrical transformers, and transformer components;
vi) Fluorescent light ballasts, fluorescent lamps, neon, and high-intensity or mercury vapor lights;
vii) Military ordnance, except ordnance designated specifically as Material Designated as Safe;
viii)Explosives, explosive residues, fireworks, and other incendiary materials;
ix) Regulated electronic waste;
x) Mercury containing devices;
xi) Batteries, including, but not limited to, lead-acid batteries and lithium-ion batteries; and,
xii) Compressed gas cylinders and propane canisters, unless empty and disabled.
29) Requires the owner or operator of the metal shredding facility to develop and implement procedures for any depollution operations that are conducted at the metal shredding facility involving the removal of automotive fuels, lubricating oils, refrigerants, and materials that require special handling, as defined in existing law (Public Resources Code (PRC) § 42167), including procedures for the proper management of those materials or wastes that are removed during depollution operations, pursuant to existing law (HSC § 25212).
30) Authorizes the owner or operator of a metal shredding facility to make specified physical or operational changes to the metal shredding facility without seeking prior approval from DTSC.
31) Requires the owner or operator of a metal shredding facility to manage all metal shredder aggregate, untreated and treated metal shredder residue during metal processing operations as necessary to achieve the following minimum standards:
a) All outdoor equipment used for processing or conveyance of metal shredder aggregate shall be enclosed or covered and designed, operated, and maintained to minimize the possibility of the release of light fibrous material into the environment;
b) All vehicles used for the outdoor transfer of metal shredder aggregate shall be loaded and unloaded in a manner that minimizes the possibility of the release of metal shredder aggregate, including light fibrous material into the environment; and,
c) Metal shredder aggregate shall be stored or accumulated inside a structure that protects the material from exposure to the elements and minimizes the possibility of the release of light fibrous material into the environment. At a minimum, the structure shall meet all of the following requirements:
i) The structure shall be enclosed with a floor, roof, and walls sufficient to protect the metal shredder aggregate from exposure to the elements and to contain the metal shredder aggregate and any process residues that are managed in the structure;
ii) The roof shall completely cover all areas used for storage or accumulation of metal shredder aggregate; and,
iii) The floor shall be constructed of concrete surfacing, steel plate, or other surfacing material approved by the department designed to prevent infiltration and collect and route any water that drains from the metal shredder aggregate to a process water management system.
32) Provides that, if managed in accordance with this bill, including any plans approved by DTSC and any additional conditions imposed by DTSC, the following materials are not waste, and shall not be subject to regulation the state Hazardous Waste Control Law (HWCL):
a) Scrap metal;
b) Metal shredder aggregate that is managed according to specified requirements;
c) Intermediate metal products that are subject to further processing to improve product quality;
d) Finished ferrous and nonferrous metal commodities that are separated or removed from metal shredder aggregate at a metal shredding facility; and,
e) Nonmetallic recyclable items recovered from metal shredder aggregate for which a market exists.
33) Requires metal shredder aggregate, including light fibrous material, which is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, to be subject to regulation as hazardous waste under the HWCL, if it exhibits a characteristic of hazardous waste.
34) Requires untreated metal shredder residue that meets the definition of a non-RCRA hazardous waste to be chemically treated in accordance with the requirements of this bill or managed in accordance with all applicable requirements of the HWCL. Chemically treated metal shredder residue is not hazardous waste if all of the specified conditions are met.
35) Provides that the owner or operator of a metal shredding facility is not required to treat metal shredder residue.
36) Requires, within one year after the effective date of this bill, the owner or operator of a metal shredding facility to conduct a preliminary endangerment assessment, and to submit it to DTSC. Requires the owner or operator of a metal shredding facility to conduct appropriate corrective action as needed to address releases of hazardous materials or wastes that pose a significant threat to human health or the environment.
37) Requires the owner or operator of a metal shredding facility to provide DTSC with immediate notice of a fire or other incident at the metal shredding facility that requires the assistance of a local fire department or other first responder.
38) Requires the owner or operator of a metal shredding facility to establish an effective means of providing public notice to members of the surrounding community upon the occurrence of a fire or other incident that poses a threat to human health or the environment outside of the facility.
39) Requires the owner or operator of a metal shredding facility to have a written closure plan, subject to approval by DTSC, which covers how to safely close the facility including a closure cost estimate.
40) Requires the owner or operator to provide a financial assurance mechanism for closure of the metal shredding facility using one or more of the financial mechanisms described in regulations within the authority of the HWCL. Additionally requires the owner or operator to provide a financial assurance mechanism for bodily injury and property damage to third parties caused by sudden accidental occurrences arising from operations of the metal shredding facility.
41) Requires DTSC, via regulations, including emergency regulations, adopted by DTSC, to collect an annual fee on all metal shredding facilities that are subject to the requirements of this bill, to reimburse DTSC's reasonable costs to implement all aspects of this bill, other than costs connected to review of a facility's permit.
42) Requires a person who applies for a metal shredding facility permit under this bill to enter into a written agreement with DTSC, such that the person will reimburse DTSC for the direct costs reasonably incurred in processing the application. Requires the facility to reimburse DTSC's costs sufficient to cover review of the permit application, the conduct of public meetings and notices associated with the permit process, and preparation of the permit.
43) Provides that the enforcement authority granted to DTSC under the HWCL and its implementing regulations may be used to enforce the provisions of this bill, including, but not limited to, the authority to pursue administrative or judicial enforcement for violations of this bill and any implementing regulations, to suspend the authorization of any metal shredding facility that has been determined based on substantial evidence to pose an imminent and substantial endangerment to human health or the environment, and to deny an application for a permit for any of the reasons set forth in this bill.
44) Authorizes DTSC to order the temporary cessation of shredder operations and may prohibit the receipt of additional shredder feedstock by the facility, under specified conditions.
45) Authorizes DTSC to prohibit the receipt of shredder feedstock at a metal shredding facility on a temporary basis if the owner or operator exceeds the limitations relating to pile size and duration set forth in this bill.
46) Authorizes DTSC to deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility under this bill. A denial, revocation, or suspension shall be based on at least one of the following:
a) Noncompliance with a condition of the applicable permit that results in a significant threat to human health or the environment;
b) An owner or operator’s failure in the application or during the approval process to disclose fully all relevant facts or a misrepresentation of any relevant fact at any time;
c) A determination, supported by substantial evidence, that the permitted activity poses a danger to human health or the environment that can only be addressed by permit denial, modification, suspension, or revocation; or,
d) Any cause specified in HSC § 25186 under the HWCL (which allows for denial, revocation, etc., if a person violates one of the state or federal environmental laws or regulations listed within the HWCL).
47) Requires DTSC, if DTSC takes an action to deny, revoke, or suspend a permit under this bill, to provide notice of the proposed action to the owner or operator of the metal shredding facility by certified mail, with return receipt requested or by personal service.
48) Authorizes an owner or operator who wishes to appeal that action [to deny, revoke or suspend a permit] to appeal by submitting a letter to DTSC, within 10 days of receipt of notice of the action and requesting a hearing.
49) Provides that, except for permit decisions, proceedings to appeal any decision made by DTSC under this bill, shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code. Requires, before initiating an appeal, the owner or operator of a facility to meet and confer with DTSC in a good faith effort to resolve the dispute.
50) Provides that proceedings to appeal DTSC's decision concerning the denial, revocation, or suspension of a permit to operate a metal shredding facility pursuant to this bill shall be conducted in accordance with Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code.
51) Provides that nothing in this bill, and no action taken by DTSC pursuant to this bill, shall be construed as a limitation on the right of a city attorney, county counsel, district attorney, or the Attorney General to maintain a civil or criminal prosecution or of any person to maintain any civil action otherwise authorized by law.
52) Exempts from the definition of hazardous waste, under the HWCL:
a) Chemically treated metal shredder residue (if treated according to the provisions of this bill);
b) Scrap metal;
c) Metal shredder aggregate (managed in accordance with the requirements of this bill);
d) Intermediate metal products that are subject to further processing to improve product quality;
e) Finished ferrous and nonferrous metal commodities that are separated or removed from metal shredder aggregate at a metal shredding facility; and,
f) Nonmetallic recyclable items recovered from metal shredder aggregate for which a market exists.
EXISTING LAW:
1) Requires DTSC to enforce the standards within the HWCL and the regulations adopted by DTSC pursuant to the HWCL. (HSC § 25180)
2) Authorizes DTSC to deny, suspend, or revoke any permit, registration, or certificate applied for, or issued pursuant to, the HWCL. Includes within this authority the ability of DTSC to deny, suspend, or revoke any permit, registration, or certificate applied for any violation of various state and federal environmental laws and regulations further specified. (HSC § 25186)
3) Authorizes DTSC to issue permits for the use and operation of one or more hazardous waste management units at a facility that meets the standards adopted pursuant to the HWCL. (HSC § 25200 (a))
4) Requires DTSC to impose conditions on each permit specifying the types of hazardous wastes that may be accepted for transfer, storage, treatment, or disposal. (HSC § 25200 (a))
5) Requires DTSC, on or before January 1, 2018, to adopt regulations establishing or updating criteria used for the issuance of a new or modified permit or renewal of a permit, which may include criteria for the denial or suspension of a permit; how to address cumulative impacts to nearby populations of a facility; and, minimum setback distances from sensitive receptors. (HSC § 25200.21)
6) Creates within DTSC the Board of Environmental Safety (Board), consisting of five voting members; requires the Board to set regulatory fees; hear and decide appeals of hazardous waste facility permit decisions; provide opportunities for public hearings on permitted or remediation sites; review and consider for approval the director of DTSC's annual priorities; conduct an analysis of DTSC's regulatory fee structure; and conduct an analysis of DTSC's programs. (HSC § 25125)
7) Authorizes DTSC, in consultation with the Department of Resources, Recycling and Recovery, the State Water Resources Control Board, and affected local air quality management districts, to adopt regulations establishing management standards for metal shredding facilities for hazardous waste management activities within DTSC's jurisdiction as an alternative to the requirements specified in the HWCL (this authority expired on January 1, 2018). (HSC § 25150.82 (c))
8) Authorizes DTSC to collect an annual fee from all metal shredding facilities that are subject to the requirements of the HWCL or to the alternative management standards adopted pursuant to HSC § 25150.82. Requires DTSC to establish and adopt regulations necessary to administer this fee and to establish a fee schedule that is set at a rate sufficient to reimburse DTSC's costs to implement the HWCL as applicable to metal shredder facilities. Authorizes the fee schedule established by DTSC to be updated periodically as necessary and requires the assessment to be no more than the reasonable and necessary cost of DTSC to implement the HWCL, as applicable to metal shredder facilities. (HSC § 25150.84 (a))
9) Defines "metal shredding facility" as an operation that uses a shredding technique to process end-of-life vehicles, appliances, and other forms of scrap metal to facilitate the separation and sorting of ferrous metals, nonferrous metals, and other recyclable materials from nonrecyclable materials that are components of the end-of-life vehicles, appliances, and other forms of scrap metal. "Metal shredding facility" does not include a feeder yard, a metal crusher, or a metal baler, if that facility does not otherwise conduct metal shredding operations. (HSC § 25150.82 (b))
10) Prohibits materials that require special handling (MRSH),contained in major appliances, from being disposed of at a solid waste facility and requires them to be removed from major appliances in which they are contained prior to the appliance being crushed, baled, shredded, sawed or sheared apart, disposed of, or otherwise processed in a manner that could result in the release or prevent the removal of materials that require special handling. Once removed, these MRSH shall be managed as a hazardous waste and any violations related to the management of MRSH are subject to the violations in the HWCL. (HSC § 25212)
11) Requires materials that require special handling to be removed from major appliances and vehicles in which they are contained prior to crushing for transport or transferring to a baler or shredder for recycling. (PRC § 42175)
12) Defines "vehicle" as any device used for transportation, including bicycles, airplanes, and other transportation devices not used on highways, and automobiles and other vehicles, as defined in Section 670 of the Vehicle Code. (PRC § 42165)
13) Defines "major appliance" as any domestic or commercial device, including, but not limited to, a washing machine, clothes dryer, hot water heater, dehumidifier, conventional oven, microwave oven, stove, refrigerator, freezer, air-conditioner, trash compactor, and residential furnace. (PRC § 42166)
FISCAL EFFECT: Unknown.
COMMENTS:
Need for the bill: According to the author:
"Metal shredding facilities recycle millions of end-of-life vehicles, household appliances, and other metallic items produced, used, and discarded annually in California. Unless recycled, these metal materials would rapidly overwhelm all available landfill capacity, creating a massive accumulation of damaged and abandoned cars, appliances, and other items.
Metal shredding poses environmental concerns to surrounding communities because the shredding process has the potential to release particulate materials and has a risk of causing fire. The current framework for hazardous waste does not include metal shredding facilities and therefore the facilities are not required to obtain a permit and are not regulated by the California Department of Toxics and Substance Control (DTSC). Without a comprehensive regulatory framework, DTSC on their own has begun to regulate the industry on a facility-by-facility basis using a hazardous waste enforcement framework, creating an uncertain and inconsistent legal environment, which has resulted in litigation.
SB 811 will resolve this uncertainty, end the litigation, and ensure comprehensive and robust oversight and enforcement of metal shredding facilities under DTSC’s authority. This bill will ensure that California remains a sustainability leader in ‘reducing, reusing and recycling’ by fostering the recycling of scrap metal into new metal products, while at the same time protecting adjoining communities from environmental pollution.
SB 811 includes provisions to address the governor’s veto message on SB 404."
California Hazardous Waste Control Law (HWCL): The HWCL is the state's program that implements and enforces federal hazardous waste law in California and directs DTSC to oversee and implement the state's hazardous waste laws and regulations. Any person who stores, treats, or disposes of hazardous waste must obtain a permit from DTSC. The HWCL covers the entire management of hazardous waste, including hazardous waste generation, management, transportation, and ultimately disposal into a state or federally authorized facility.
DTSC's hazardous waste management permitting program: DTSC is responsible for administering the hazardous waste facility permitting program established under the HWCL and the federal RCRA. The core activities of the permitting program include: review of RCRA and non-RCRA hazardous waste permit applications to ensure safe design and operation; issuance and denial of operating permits; issuance of post-closure permits; approval and denial of permit modifications; issuance and denial of emergency permits; review and approval of closure plans; oversight of approved closure plans; and, ensuring a public process on the permitting of hazardous waste facilities.
DTSC's hazardous waste management enforcement program: DTSC's inspection and enforcement responsibilities include its delegated authority under RCRA, California's HWCL, and state laws pertaining to toxics in packaging, toxic substances in consumer products, and disposal of universal wastes, such as electronic waste. Core activities of DTSC's hazardous waste management program include routine and targeted compliance inspections. Routine compliance inspections involve review of submitted data and reports, as well as physical observation, testing, and evaluation of regulated facilities. Targeted compliance inspections involve review of specific units or processes in response to focused concerns or to inform permitting decisions, as well as analysis of current and historical compliance.
Metal shredder facilities: California law defines a "metal shredding facility" as an operation that uses a shredding technique to process end-of-life vehicles, appliances, and other forms of scrap metal to facilitate the separation and sorting of ferrous metals, nonferrous metals, and other recyclable materials from non-recyclable materials. A "metal shredding facility" does not include a feeder yard, a metal crusher, or a metal baler, if that facility does not otherwise conduct metal shredding operations. As such, most scrap metal recycling facilities would not be subject to any proposed regulations meant to manage the waste generated from metal shredding facilities.
Currently, there are ten metal shredding facilities operating in California. Seven of these are larger facilities, and 3 of them process a much smaller amount of metal. These facilities are located in the following cities: Anaheim, Bakersfield, Colton, Lancaster, Los Angeles, Oakland, Redwood City, Stockton, Sun Valley, and Vallejo.
Metal shredder waste: The shredding of scrap metal (e.g., end-of-life vehicles) results in a mixture of recyclable materials (e.g., ferrous metals and nonferrous metals) and non-recyclable material (i.e., metal shredder waste). Aggregate is generated after the initial separation of ferrous metals and consists of nonferrous metals that can be further recovered and metal shredder waste. Metal shredder waste consists mainly of glass, fiber, rubber, automobile fluids, dirt, and plastics in automobiles and household appliances that remain after the recyclable metals have been removed. Because scrap metal contains regulated hazardous constituents, it can contaminate and ultimately cause metal shredder waste to exhibit a characteristic of hazardous waste for toxicity. In a 2002 draft report on auto shredder waste, DTSC showed that metal shredder waste often exceeded the soluble threshold limit concentrations (STLCs) for lead, cadmium, and zinc.
Non-hazardous waste classification granted to metal shredding facilities: Based on the hazardous characteristics of metal shredder waste, in many instances, metal shredding facilities are hazardous waste generators and are thus subject to hazardous waste requirements, including permitting, transportation, and disposal. In the late 1980s, in an effort to relieve metal shredding facilities of these requirements, the Department of Health Services (DHS) (the predecessor of DTSC) determined that the metal treatment fixation technologies were capable of lowering the soluble concentrations of metal shredder waste such that the treated metal shredder waste was rendered insignificant as a hazard to human health and safety, livestock, and wildlife. Seven metal shredding facilities applied for and were granted nonhazardous waste classification letters by DHS, and later DTSC, if they used the metal treatment fixation technologies. The authority to issue these classifications is found in subdivision (f) of Section 66260.200 of Title 22 of the California Code of Regulations, and these determinations are now known as "f letters." These classifications ultimately allowed treated metal shredder waste to be handled, transported, and disposed of as non-hazardous waste in class III landfills (i.e., solid (nonhazardous) waste landfills).
Legislation to address impacts of metal shredding facilities: In 2014, Senator Jerry Hill introduced SB 1249 (Chapter 756), based in part on concerns about metal shredder safety due to recent fires at metal shredding facilities in his district, but also in response to the historic concerns about metal shredding facilities and their potential impact on the environment. The intent of the bill was that the conditional nonhazardous waste classifications, as documented through the historical "f letters," be revoked and that metal shredding facilities be thoroughly evaluated and regulated to ensure adequate protection of human health and the environment. SB 1249 was signed by the Governor and authorized DTSC to develop alternative management standards (different from a hazardous waste facility permit) if, after a comprehensive evaluation of metal shredding facilities, DTSC determined that alternative management standards were warranted.
DTSC's implementation of SB 1249: DTSC's implementation of SB 1249 included: conducting a comprehensive evaluation of metal shredding facilities and metal shredder waste; determining if alternative management standards specific to metal shredding facilities could be developed to ensure that the management, treatment, and disposal practices related to metal shredder waste are protective of human health and the environment; preparing an analysis of activities to which the alternative standards will apply, made available to the public before any regulations were adopted; and, adopting emergency regulations establishing a fee schedule to reimburse DTSC's costs for the evaluation, analysis, and regulatory development for metal shredding facilities.
As part of this implementation, in January 2015, DTSC developed a three-year work plan to implement SB 1249. The work plan includes development of a treatability study on metal shredder wastes to demonstrate the highest level of treatment that can be achieved with current technology, and an assessment of the potential for treated or untreated metal shredder waste to migrate off-site and impact residents or business occupants in the areas surrounding metal shredding facilities and landfills that accept metal shredder waste.
As part of the work plan, DTSC approved air monitoring summary reports for metal shredding facilities located in Bakersfield, Redwood City, and Terminal Island. Air sampling was conducted at the facilities during October 2016 to assess the potential for offsite emissions associated with the metal shredding operations.
DTSC's evaluation of metal shredding facilities: As part of SB 1249, DTSC conducted a multi-year evaluation of metal shredding facilities, issuing a draft report in 2018 and then issuing a final report in August of 2021 titled, "Evaluation and Analysis of Metal Shredding Facilities and Metal Shredder Wastes." According the final report:
"The Department of Toxic Substances Control (DTSC) is pleased to present this Evaluation and Analysis of Metal Shredding Facilities and Metal Shredder Wastes (Final Report). This Final Report incorporates feedback received after initial posting of the Draft Report in 2018, summarizes recent enforcement actions taken since 2018, provides an analysis of the DTSC-directed treatability study, incorporates information learned by DTSC during the course of its community workshops and stakeholder consultation group meetings, and revises terminology where appropriate. DTSC reviewed hazardous waste management activities, current regulatory environmental oversight, and the history of releases, contamination, and enforcement actions at metal shredding facilities in California.
Additionally, DTSC coordinated with metal shredding facilities on a treatability study to identify the highest level of treatment that could be achieved to stabilize metals of concern on metal shredder waste with current technology. DTSC also reviewed the current disposal practices of chemically treated metal shredder waste at municipal solid waste landfills to identify the potential for migration of contaminants to groundwater, surface water, and the air. The study team found numerous examples of accidents, improper storage of hazardous wastes, soil contamination, and releases of hazardous wastes that impacted the environment and surrounding communities at metal shredding facilities.
DTSC and other agencies have taken several enforcement actions against metal shredding facilities in response to these types of incidents. DTSC’s efforts have allowed for it to gain a more thorough understanding of metal shredder operations, as well as of the ambiguities within the existing regulatory framework under which metal recyclers, including shredding facilities, have historically operated. Based on this evaluation, DTSC has determined that the point of generation of hazardous waste is at the shredder itself, meaning that various downstream activities performed at the facilities would be subject to the Hazardous Waste Control Law. Under the Hazardous Waste Control Law, entities who conduct hazardous waste treatment, storage, or disposal are required to apply for and receive a form of authorization from DTSC in order to operate. Based on the results of its evaluation and DTSC's updated understanding of these activities, metal shredding facilities would require a form of authorization from DTSC to continue to operate in the same manner.
DTSC’s analysis demonstrates that the disposal of chemically treated metal shredder residue as nonhazardous waste in municipal solid waste landfills, including its use as alternative daily cover, has not resulted in harm to human health or safety or to the environment, based on the limited data available to DTSC. Additionally, the analysis demonstrates that chemically treated metal shredder residue has not contributed to the solubilization and migration of heavy metals from solid waste landfills via leaching into soil or groundwater, surface water contamination, or windborne dispersion. Thus, while various protections and requirements related to the management of chemically treated metal shredder residue (CTMSR) during its transportation to landfills may need to be developed to ensure the safety of human health and the environment, DTSC has concluded that it is not necessary that metal shredder residue that has been appropriately chemically treated, managed, and transported, to be disposed of as a hazardous waste to prevent or mitigate potential hazards to human health or safety or to the environment."
Implementation of SB 673 (Lara, Chapter 611, Statutes of 2015): SB 673 was signed into law in 2015, creating an opportunity for DTSC to improve the permit process for hazardous waste facilities. Implementation of SB 673 provided DTSC with an opportunity to address long standing environmental justice concerns stemming from the location, operation, and expansion of hazardous waste facilities. The provisions of SB 673 provided for stronger permit criteria to further protect communities and consider "the vulnerability of, and existing health risks, to nearby populations" when issuing new or modified permits and permit renewals. DTSC's efforts to implement SB 673 included dividing the regulations into two tracts. One tract has been implemented and it deals with incorporating past violations into permitting decisions. This is also known as the violation scoring procedure. The remaining piece of SB 673 has yet to be implemented and requires DTSC to evaluate community vulnerability, health risks, and setback distances into its permitting processes.
This bill: SB 811 requires DTSC to evaluate how to incorporate the part of SB 673 dealing with community vulnerability and minimum setbacks distances into its permitting of metal shredding facilities. However, SB 811 does not include, and some stakeholders have requested that it include, DTSC's violation scoring procedure in its permitting of metal shredding facilities.
Recent legislation dealing with metal shredding facilities: Two years ago, the legislature enacted and the Governor signed AB 2851 (Bonta, Chapter 743, Statutes of 2024), which requires DTSC, in consultation with local air pollution control districts and air quality management districts, to develop and implement facility-wide fence-line air quality monitoring at metal shredding facilities. It is important to note that the funding for AB 2851 comes from fees from metal shredders detailed under the HWCL. While this bill strikes that section dealing with metal shredder fees in the HWCL, it reenacts the same fee authority in a new section in SB 811. Therefore, there is no impact to the funding of AB 2851 from this bill.
Last year, SB 404 (Caballero), which is nearly identical to SB 811, was vetoed by the Governor. In his veto message the Governor stated:
"I support the author's intent to create a uniform structure for permitting metal shredding facilities in California. These facilities are critical to maintaining supply chain stability, recycling millions of end-of-life vehicles, household appliances, and other metallic items produced, used, and discarded annually in California. Unless recycled, these metal materials would overwhelm available landfill capacity, creating a massive accumulation of damaged and abandoned cars, appliances, and other items.
However, this bill lacks clear definitions regarding the materials processed at these facilities, including what "hazardous waste" requirements are applicable. Without this clarity, this bill is not as protective, places a significant burden on DTSC, and cannot be successfully implemented.
I encourage the author to work closely with DTSC and interested parties to remedy this issue, as well as ensure that any future legislation requires metal shredding facilities operate, and be permitted to operate, in a health-protective manner."
According to the author of SB 811 and the sponsors of the bill, they did have conversations with DTSC and as a result have amended SB 811 to incorporate both technical changes and changes to further clarify that DTSC can exercise its enforcement authority under the HWCL for specific violations of SB 811.
Key details contained in SB 811: This bill creates an entirely new permitting structure for metal shredding facilities. While there are aspects of this bill that are similar to or consistent with the requirements for hazardous waste facilities under the HWCL, the permits under this bill are completely new in the state. Below are some key aspects contained within SB 811:
1) Clarifies that this bill does not limit the authority of a local air pollution control district, air quality management district, Unified Program Agency, or a local environmental health department that is not a Unified Program Agency.
2) Prohibits, unless otherwise specified, a metal shredding facility from operating in California, unless it has a permit issued by DTSC.
3) Requires DTSC to evaluate how to apply, to metal shredding facilities, its policies relating to environmental justice and the protection of vulnerable communities or sensitive receptors and other sensitive locations, as described in existing law (HSC § 25200.21(b-c))
4) Requires DTSC to determine, on the basis of substantial evidence, that operation of the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities, before approving or denying a permit under this bill.
5) Requires DTSC to impose any additional facility-specific conditions that are necessary to ensure compliance with this bill and for the protection of human health and the environment.
6) Requires the metal shredding facility, before they submit a permit application to DTSC, to hold at least one public meeting, approved by DTSC, to inform the community about the metal shredding facility and any potential impacts to nearby communities.
7) Authorizes a metal shredding facility to make specified physical or operational changes to the metal shredding facility without seeking prior approval from DTSC.
8) Clarifies that metal shredder aggregate, including light fibrous material, that is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, shall be subject to regulation as hazardous waste under the HWCL.
9) Requires the metal shredding facility, within one year of the effective date of this bill, to conduct an on-site investigation to determine if there have been any releases to the environment. Requires the facility to conduct cleanup of any releases that pose a significant threat to human health or the environment. Clarifies that DTSC still has its authority under the HWCL to order any investigation and cleanup as necessary.
10) Requires the metal shredding facility to establish an effective means of providing public notice to members of the surrounding community upon the occurrence of a fire or other incident that poses a threat to human health or the environment outside of the facility.
11) Requires the owner or operator to provide a financial assurance mechanism for closure of the metal shredding facility and for bodily injury and property damage. (note: financial assurance is a mechanism under the HWCL that allows DTSC to access funding, provided by the facility, to safely close the facility or perform other cleanup as necessary, in the event the facility was no longer operating or bankrupt)
12) Clarifies that DTSC can use any authority it has under the HWCL to enforce the provisions of this bill.
13) Authorizes DTSC to order the temporary shutdown of shredding operations or prohibit the receipt of shredder feedstock under certain circumstances.
14) Authorizes DTSC to deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility based on at least one of the following:
a) Noncompliance with a condition of the applicable permit that results in a significant threat to human health or the environment;
b) An owner or operator’s failure in the application or during the approval process to disclose fully all relevant facts or a misrepresentation of any relevant fact at any time;
c) A determination, supported by substantial evidence, that the permitted activity poses a danger to human health or the environment that can only be addressed by permit denial, modification, suspension, or revocation; or,
d) Any cause specified in HSC § 25186 under the HWCL. (in short: this means a permit could be denied, suspended, etc., if the facility violates any one of the state and federal environmental laws and regulations listed in this referenced code section).
15) Clarifies that an approval of an application for an existing or new metal shredding facility is subject to the provisions of the California Environmental Quality Act.
Stakeholder engagement and recent amendments to this bill: Over the course of the legislative process, this bill (and SB 404) has undergone significant revisions pursuant to stakeholder conversations and engagement among the Author, sponsors, and opposition. Amendments taken have intended to address the following issues: preservation of authority of local agencies (CUPAs, local health officers, and public attorneys); enhancing permit requirements to reduce impacts to communities; improve public participation in the permitting of metal shredding facilities; issues specific to smaller metal shredders; improvements to the prevention of fires at metal shredding facilities; more specific enforcement options; clarifying that the fees paid by metal shredders under this bill will also be available to implement AB 2851; and provisions to deal with the prevention of off-site releases.
However, even though the bill has been substantially amended as mentioned above, various stakeholders remain opposed to the bill.
SB 811 compared to a hazardous waste facility permit: There have been significant stakeholder discussions regarding the requirements under SB 811 and the requirements for a hazardous waste facility. There are similarities in the requirements under this bill and for a hazardous waste facility permit. At a very high level, both SB 811 and a hazardous waste facility permit require the following:
1) A closure plan and a cost estimate for closure;
2) Evidence of financial assurance for the closure plan;
3) An Inventory management plan;
4) A housekeeping plan;
5) A training plan;
6) Facility security plan;
7) An inspection plan;
8) A preparedness and prevention plan;
9) A contingency plan;
10) An authorization to make operational changes without DTSC approval under certain circumstances; and,
11) A preliminary endangerment assessment (to assess possible onsite contamination).
In addition, both SB 811 and a hazardous waste facility permit authorize DTSC to make any additional changes necessary to the permit to protect human health and safety and authorize DTSC to deny, suspend, or revoke the permit.
Requirements on metal shredders today versus under SB 811: While there has been significant discussion around how metal shredders would be regulated under the HWCL, it's important to note that there is a significant difference in how these metal shredding facilities are currently regulated versus under SB 811. Currently, metal shredding facilities are not permitted by DTSC and are regulated mainly as a generator of hazardous waste. This means that as a business they generate and manage hazardous waste and are required to manage the hazardous waste under the conditions of the HWCL. In addition, as noted earlier, DTSC issued these facilities "f" letters authorizing them to treat the metal shredder residue. It's safe to say that over the past 30-40 years there hasn't been consistent regulation of metal shredder facilities by the state. SB 811 would eliminate that confusion and would establish a permit for metal shredding facilities (outside of the HWCL). The conditions under SB 811, as noted above, and cited in the earlier part of this analysis are largely not required of these facilities today. Currently these facilities are not required to have a closure plan, cost estimate for closure, financial assurance mechanism to cover the closure cost, training or inspection plan, fire prevention plan, or an assessment of potential onsite contamination. SB 811 changes that and imposes a consistent set of permit requirements, overseen by DTSC, with the goal that these facilities operate safely and do not negatively impact their surrounding community.
This bill: SB 811 creates a regulatory structure in state law for metal shredding facilities. There are currently ten metal shredding facilities in the state, some operating under regulatory authorization from the 1980s and 1990s. These facilities are an important piece of the metal recycling infrastructure in California. However, having one clear regulatory structure for all metal shredding facilities in the state makes sense. Having clear rules will be helpful for state and local regulators and metal shredding facilities, and will help set the regulatory standard for future metal shredding facilities in the state.
Issues for consideration: As the bill moves through the process, the author may wish to consider any or some of the following:
1) Shifting the permit appeals authority from the Board of Administration Hearings to the Board of Environmental Safety. Also clarify that the BES can use their existing regulation for permit appeals for permit appeals under this bill.
2) Specifically authorize DTSC to include any additional requirements in the fire prevention plan required pursuant to 25095.13 (b), as recommended by a local fire department or CUPA.
3) Clarify that the CUPA can enforce the requirements of a metal shredder permit that are under the CUPAs authority, including, but not limited to, ensuring compliance with the inbound source control policy required pursuant to 25095.12 (b).
4) Provide further direction to DTSC to take into consideration the size and nature of a small metal shredding facility when processing its permit application and assessing fees.
5) Require the BES to, by 2030, at a regularly scheduled public hearing, hear from DTSC, the metal shredding industry and the public on the implementation of the metal shredder permit.
Arguments in support: According to the California Metal Recyclers Coalition:
"Metal shredding facilities provide an essential public service to many sectors of the economy, including state and municipal governments, California businesses and residents by providing a safe, reliable and environmentally responsible means of recycling the vast quantities of recyclable metal-containing materials that are generated in the state every day. These facilities successfully recycle millions of end-of-life vehicles, trucks, busses, household appliances, steel beams, rebar and other metallic construction materials, and thousands of other items ranging in size from a backyard barbeque to sections of the old San Francisco-Oakland Bay Bridge. More than ever, these facilities provide the only feasible and cost-effective means of dealing with the huge number of burned vehicles, household appliances and other metal items that are damaged or destroyed by the wildfires which are sweeping though our communities with distressing frequency.
SB 811 is virtually identical to SB 404 (Caballero), which was passed by the Legislature last
year with only one 'no' vote. Unfortunately, the Governor vetoed the bill due to an
implementation issue that could not be resolved prior to passage due to time constraints.
However, the Governor’s veto message expressed his desire that this issue be resolved so that a new bill could be signed to ensure that these critical facilities may continue to operate in
California.
SB 811 accomplishes this goal. SB 811 is identical to SB 404 with the exception of very minor amendments that resolve the implementation issues referred to in the Governor’s veto message. These amendments make clear that the requirements of the bill apply to both the metal processing operations and the materials processed by those operations, and that DTSC retains authority under the Hazardous Waste Control Law to pursue enforcement against metal shredding facilities in certain prescribed circumstances. The Metal Recyclers Coalition worked with the Department of Toxic Substances Control (DTSC) to ensure that the proposed amendments are clear and achieve the necessary clarifications of the bill’s language.
SB 811 solves a problem that has threatened the economic viability of metal shredding facilities for almost a decade—the lack of clarity around how these critical facilities should be regulated. In the same fashion as SB 404, SB 811 would establish a new regulatory program in the Health and Safety Code devoted specifically to this industry, that would be administered by DTSC. The industry has worked proactively with DTSC to address issues raised by the agency and to ensure the safe operation of these facilities. Significant operational improvements have been achieved at metal shredding facilities over the past few years, and the regulatory framework established by SB 811 will further ensure that these important facilities continue to operate safely and in an environmentally protective manner."
Arguments in opposition: According to a coalition of environmental and environmental justice organizations:
"The undersigned organizations respectfully oppose Senate Bill 811 by Senator Caballero. The bill’s effort to exclude metal shredders from California’s hazardous waste laws while providing an inadequate replacement puts communities and the environment at risk. Our organizations raised our concerns in opposition to SB 404, which was vetoed last session but has been revived as SB 811. Despite the minor amendments from SB 404, this bill still fails to address significant concerns and should be rejected.
The materials managed at metal shredding facilities are hazardous waste and must be regulated as such under California’s hazardous waste laws. Instead of SB 811’s overly complicated approach, California should regulate metal shredding facilities under the existing hazardous waste framework, including by promptly requiring the facilities to obtain hazardous waste permits with conditions necessary to protect human health and the environment. The Department of Toxic Substances Control (DTSC) should then be directed to develop additional requirements, within the existing hazardous waste legal framework, tailored to address the ongoing problems we’ve seen at metal shredding facilities—including fires and dispersal of heavy metals into surrounding communities.
DTSC already struggles to manage its existing regulatory responsibilities. Carving metal shredding facilities out of the hazardous waste framework to create a separate permitting regime for the metal shredding industry will stretch DTSC even thinner and needlessly tax its capacity to implement the hazardous waste program. The focus instead should be on ensuring DTSC is providing regulatory oversight and ensuring protection of human health and the environment.
We agree with the need to address the threats posed by metal shredding facilities to communities, but this bill as written moves in the wrong direction."
According to Universal Service Recycling, Inc. (Universal), Pacific Auto Recycling Center (PARC), and Kramar’s Iron & Metal Co. (Kramar):
"Universal Service Recycling, Inc. (Universal), Pacific Auto Recycling Center (PARC), and Kramar's Iron & Metal Co. (Kramar), three small businesses that have shredded and recycled metals in California for decades, are regrettably opposed to SB 811 unless it is amended to eliminate the duplicative, overly burdensome, and costly requirements it would impose on our businesses.
As the bill correctly observes, metal shredding and recycling is a critical circular economy and environmental protection measure in California. Small metal recyclers like Universal, PARC, and Kramar assist in the statewide recovery of valuable secondary metals, separating and bundling them into compact and transportable bales that can be sold as raw materials for manufacturing new metal products, such as rebar. These companies also play an important role in the cleanup process that follows natural disasters, such as the catastrophic wildfires that impacted Los Angeles communities earlier this year and also support local economies in disadvantaged communities for the many jobbers who collect and sell scrap metal.
Since small metal recyclers do not chemically treat metal shredder residue (MSR), they are already regulated by the Department of Toxic Substances Control (DTSC), and all their generation and handling of MSR must comply with hazardous waste generator requirements found in Title 22 of the California Code of Regulations.
Accordingly, we request that SB 811 be amended to clearly distinguish between the two pathways for proper regulation of metal shredder residue. Under our proposed amendments, the small metal recyclers that do not chemically treat metal shredder residue and that have obtained all necessary permits and authorizations from the myriad agencies with jurisdiction over different facets of metal shredding operations, would continue to be regulated by DTSC under DTSC's own hazardous waste generator regulations. As such, these facilities would not need to obtain the permit contemplated in SB 811. The SB 811 permitting process would be the primary means of authorizing and regulating the chemical treatment of metal shredder residue and would also serve as the backstop for facilities that do not have all the necessary regulatory mechanisms in place."
According to California Association of Environmental Health Administrators (CAEHA), the CUPA Forum Board (CFB), and the Health Officers Association of California, writing in an opposed-unless-amended position:
"SB 811 codifies metal shredder residue and chemically treated metal shredder residue as non-hazardous waste. DTSC’s analytical results released in 2021 clearly demonstrate that metal shredder residues remain hazardous waste even after treatment. The public’s health is endangered when we ignore the hazardous nature of residue which is produced by locations often located in close proximity to low-income communities.
Emergencies start and end locally. California communities are burdened by fires at metal shredding facilities (including a recent fire at Radius Recycling’s Oakland’s facility on March 11, 2026) which release hazardous waste constituents into the local community, endangering the public’s health. SB 811 creates an exemption that allows the industry to treat hazardous waste without meaningful local oversight.
SB 811 sets an unwise precedent for using code to exempt a specific waste product from the hazardous waste regulatory process. Statutory provisions for the establishment of alternative management standards for metal shredder waste were enacted in 2014 (SB 1249, Chapter 756) and amended in 2025 (AB 2851, chapter 743). The Department of Toxic Substances Control (DTSC) was provided with the opportunity to adopt regulations but chose not to, instead issuing an interpretive letter, which was recently rescinded."
Related legislation:
1) SB 404 (Caballero, 2025). Requires the owner or operator of a metal shredding facility to obtain a permit from DTSC. Prohibits a metal shredding facility from operating in the state without a permit. Includes within the permit: requirements for managing various wastes within and leaving the facility, measures to prevent fires; and measures to reduce impacts to communities near the facility. Provides that local and state regulators retain enforcement authority with respect to metal shredding facilities, as that authority exists under current law. This bill was vetoed by Governor Gavin Newsom.
2) SB 1234 (Allen, 2024). Would have established permitting requirements for new and existing metal shredding facilities. Would have required an owner or operator of an existing metal shredding facility, within 120 days after the effective date of this bill, to submit to the DTSC, for review and approval, specified information that is required for a metal shredding facility permit. This bill was held on the suspense file in the Assembly Appropriations Committee.
3) AB 2851 (Bonta, Chapter 743, Statutes of 2024). Requires DTSC, in consultation with local air pollution control districts and air quality management districts, to develop and implement facility-wide fence-line air quality monitoring at metal shredding facilities.
4) SB 158 (Committee on Budget and Fiscal Review, Chapter 73, Statutes of 2021). Enacted several policy reforms to the programs overseen by DTSC, stabilized DTSC's funding, and created the Board.
5) SB 673 (Lara, Chapter 611, Statutes of 2015). Revised DTSC's permitting process and public participation requirements for hazardous waste facilities.
6) SB 1249 (Hill, Chapter 756, Statutes of 2014). Authorizes DTSC to adopt regulations establishing alternative management standards for hazardous waste management activities at metal shredding facilities until January 1, 2018.
7) SB 524 (Correa, Chapter 716, Statutes of 2009). As heard by the Assembly Environmental Safety and Toxic Materials Committee: would have prohibited DTSC from altering the current regulatory status of auto shredder residue without first considering factors considered by an auto shredder residue working group. This bill was subsequently amended into an unrelated subject and signed by the Governor.
REGISTERED SUPPORT / OPPOSITION:
Support
Beacon House Association of San Pedro
Boys & Girls Clubs of the Los Angeles Harbor
California Council for Environmental & Economic Balance
California Hispanic Chambers of Commerce
California Professional Firefighters
California State Association of Electrical Workers
California State Pipe Trades Council
Central City Association of Los Angeles
City of Los Angeles Councilmember Tim Mcosker
Councilmember John Echavarria
Ecology Recycling Services
Garden Grove Chamber of Commerce
Grand Vision Foundation
Harbor Association of Industry and Commerce
Kern County Hispanic Chamber of Commerce
Metal Recycling Coalition
Peace Officers Research Association of California
Port of Los Angeles
Recology
Redondo Beach Chamber of Commerce
Republic Services
Resource Recovery Coalition of California
San Joaquin County District Attorney's Office
San Joaquin County Sheriff - Public Administrator Patrick Withrow
ShareFest Community Development
South Bay Association of Chambers of Commerce
South Colton Diversity Committee
State of California Auto Dismantlers Association,
Strength Based Community Change
Thousand Palms Chamber of Commerce
Western States Council Sheet Metal, Air, Rail and Transportation
Opposition
1000 Grandmothers for Future Generations
350 Bay Area Action
350 Humboldt
Action Now
Active San Gabriel Valley
Alameda County District Attorney's Office
Alameda County Office of Education
Antelope Valley Economic Development and Growth Enterprise
Asian Industry Business to Business
Bay Area System Change Not Climate Change
BizFed Central Valley
Business Council San Joaquin County
California African American Chamber of Commerce
California Association of Environmental Health Administrators
California Coastkeeper Alliance
California Communities Against Toxics
California CUPA Forum
California Environmental Voters
California Safe Schools
California Small Business Association
Center for Race, Poverty, and the Environment
Central Valley Business Federation
Clean Air Coalition of North Whittier and Avocado Heights
Clean Water Action
Cleanearth4kids.org
Coalition for Clean Air
Comite Civico Del Valle
Comite Pro Uno
Communities for a Better Environment
County of Alameda
County of San Mateo Board of Supervisors
Del Amo Action Committee
Earthjustice
East Yard Communities for Environmental Justice
Facts: Families Advocating for Chemical & Toxics Safety
Fresnans Against Fracking
Greater Stockton Chamber of Commerce
GreenAction for Health and Environmental Justice
Kramar's Iron and Metal Co.
Lincoln Heights Community Coalition
Los Angeles Unified School District
National Federation of Independent Business
National Resources Defense Council
New Genesis Housing Development Corporation
Oakland Athletics
Oakland Unified School District
Pacific Auto Recycling Center
Phillipine Action Group for the Environment
Placer Earth Care Action (PECA)
Resource Renewal Institute
Richmond Shoreline Alliance
San Bernardino County
San Francisco Baykeeper
Services Recycling, INC.
Sierra Club California
Valley Industry & Commerce Association
West Berkeley Alliance for Clean Air and Safe Jobs
West Oakland Environmental Indicators Project
Analysis Prepared by: Josh Tooker / E.S. & T.M. / (916) 319-3965
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 811 |
THIRD READING
Bill No: SB 811
Author: Caballero (D)
Amended: 1/22/26
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 5-0, 1/13/26
AYES: Blakespear, Valladares, Dahle, Pérez, Reyes
NO VOTE RECORDED: Gonzalez, Hurtado, Menjivar
SENATE APPROPRIATIONS COMMITTEE: 7-0, 1/22/26
AYES: Caballero, Seyarto, Cabaldon, Dahle, Grayson, Richardson, Wahab
SUBJECT: Hazardous materials: metal shredding facilities
SOURCE: California Metal Recyclers Coalition
DIGEST:
This bill establishes a new regulatory structure at the Department of Toxic Substances Control (DTSC) for metal shredding facilities.
ANALYSIS:
Existing law:
- Defines a “metal shredding facility” as an operation that uses a shredding technique to process end-of-life vehicles, appliances, and other forms of scrap metal to help separate and sort ferrous metals, nonferrous metals, and other recyclable materials from non-recyclable materials.
- Allows DTSC in consultation with the Department of Resources Recycling and Recovery (CalRecycle), the State Water Resources Control Board (SWRCB), and local air districts to adopt regulations to set management standards for metal shredding facilities. These standards are used to regulate these facilities in lieu of standards set out in the Hazardous Waste Control Law (HWCL).
- Precludes DTSC from adopting management standards that are less stringent than standards set by federal law.
- Allows waste from a metal shredder (known as metal shredder residue or MSR) to be classified and managed as nonhazardous waste, provided certain standards are met. Such nonhazardous waste can be used as alternative daily cover or for beneficial reuse, or it may be disposed of if it complies with regulations in the Water Code.
- Allows DTSC to assess a fee on metal shredding facilities to cover the cost of the program.
- Deems treated MSR managed under the standards set in law as solid waste when it is accepted by a solid waste landfill or other authorized location for disposal or for use as alternative daily cover or other beneficial use.
This bill:
- Prohibits a metal shredding facility from operating in California, unless it has a permit issued by DTSC.
- Provides metal shredding facilities regulated under this bill are not hazardous waste facilities, but does not alter or override the authority of DTSC or a CUPA to regulate ancillary hazardous waste generated at a metal shredding facility.
- Makes it clear local air pollution control districts, air quality management districts, CUPAs, and local environmental health departments do not lose any authority to regulate metal shredding facilities.
- Authorizes DTSC to adopt, update and revise regulations to implement this bill.
- Authorizes an existing metal shredding facility operating in compliance with this bill, to continue to operate pending final action on a permit application. Facilities must have developed and continuously implement a fire prevention, detection, and response plan and comply with the limitations on pile volume and duration set forth in this bill. DTSC is permitted to take enforcement action against a non-compliant facility prior to issuing a final permit, as well as during facility operation and offsite releases, as specified.
- Requires DTSC, before issuing a permit, to determine the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities.
- Requires DTSC to impose any additional facility-specific conditions necessary to ensure compliance with this bill and for the protection of human health and the environment.
- Requires an applicant, before submitting a permit application or application for permit renewal, to hold at least one public meeting, or other community engagement activity approved by DTSC, to inform the community of metal processing activities and any potential impacts to nearby communities – and to solicit questions and input from the public.
- Authorizes a metal shredding facility to make certain physical or operational changes to the facility without getting prior approval from DTSC.
- Subjects metal shredder aggregate, including light fibrous material (LFM), which is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, to regulation as hazardous waste under the Hazardous Waste Control Law (HWCL), if it exhibits a characteristic of hazardous waste.
- Requires a metal shredding facility to provide DTSC with immediate notice of a fire or other incident at the metal shredding facility that requires the assistance of a local fire department or other first responder.
- Requires a metal shredding facility to establish an effective means of providing public notice to members of the surrounding community when a fire or other incident that poses a threat to human health or the environment outside of the facility takes place.
- Authorizes DTSC to deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility under this bill.
- Exempts from the definition of hazardous waste, under the HWCL: chemically treated metal shredder residue (if treated according to the provisions of this bill); scrap metal; metal shredder aggregate (managed in accordance with the requirements of this bill); intermediate metal products that are subject to further processing to improve product quality; finished ferrous and nonferrous metal commodities that are separated or removed from metal shredder aggregate at a metal shredding facility; and, nonmetallic recyclable items recovered from metal shredder aggregate for which a market exists.
Background
California Hazardous Waste Control Law (HWCL). The HWCL is the state's program that implements and enforces federal hazardous waste laws in California and directs DTSC to oversee and implement the state’s hazardous waste laws and regulations. Any person who stores, treats, or disposes of hazardous waste must obtain a permit from DTSC. The HWCL covers the entire management lifecycle of hazardous waste, from generation, to management, transportation, and ultimately disposal into a state or federal authorized facility.
What Do Metal Shredders Do & Produce? DTSC defines a metal shredder as an entity that processes end-of-life vehicles, appliances, and other forms of scrap metal, separates recyclable materials from non-recyclable materials, and then sells the recyclable materials and disposes of the non-recyclable materials. There are about 10 metal shredding operations in the state today.
A brief history of California metal shredder regulation and litigation. Based on the hazardous characteristics of MSR, metal shredding facilities do generate hazardous waste and – prior to the late 1980s – were subject to hazardous waste requirements, including permitting, transportation and disposal.
However, in the late 1980s, in an effort to relax the requirements on metal shredding facilities, the Department of Health Services (DHS) – the predecessor of DTSC – determined treating MSR using chemical stabilization techniques could effectively eliminate the harm posed by MSR. As a result, this waste was determined – when properly treated – to no longer pose a significant hazard to human health and safety, livestock, and wildlife.
Following this determination, seven metal shredding facilities applied for and were granted nonhazardous waste classification letters by DHS, and later DTSC, as long as they used the metal treatment fixation technologies approved by the state. Known as “f letters,” these classifications ultimately allowed treated MSR to be handled, transported, and disposed of as non-hazardous waste in class III landfills (i.e., solid (non-hazardous) waste landfills).
In November 1988, DTSC issued “Official Policy/Procedures #88-6 Auto Shredder Waste Policy and Procedures”, better known as OPP #88-6. The policy classified metal shredder aggregate as in-process material, not a waste that needed to be regulated under the state’s HWCL.
More than 30 years after it was established OPP #88-6 was unilaterally administratively rescinded by DTSC in October 2021. DTSC stated the policy was inexact, self-contradictory and in conflict with federal and state law.
One month later, in November 2021, Pacific Auto Recycling Center (PARC) filed a complaint against DTSC asking for OPP #88-6 to be re-instated. PARC argued the DTSC policy was actually a regulation under the state’s Administrative Procedure Act (APA) and as such, DTSC couldn’t simply erase OPP #88-6 without going through the APA’s regulatory process. In June 2023, the trial court agreed with PARC, ordered DTSC to re-instate OPP #88-6, and stated DTSC needed to go through the APA if it wished to rescind OPP #88-6.
In November 2021, the Institute of Scrap Recycling Industries (ISRI) and several individual companies filed suit against DTSC following its adoption of emergency regulations to remove metal shredder aggregate – the ferrous and non-ferrous metals that are recycled – from the definition of scrap metal, which effectively subjected the material to the state’s HWCL.
In March 2022, the court granted ISRI’s request to prevent the regulation from taking effect but did not rule on the underlying merits of the case and after the injunction was granted, DTSC allowed the emergency regulation to expire. The remaining claims on the merits have been consolidated with a different 2019 case pending before the court and is expected to go to trial in late 2026.
Comments
Purpose of Bill. According to the author, “Metal shredding facilities recycle millions of end-of-life vehicles, household appliances, and other metallic items produced, used, and discarded annually in California. Unless recycled, these metal materials would rapidly overwhelm all available landfill capacity, creating a massive accumulation of damaged and abandoned cars, appliances, and other items.
“Metal shredding poses environmental concerns to surrounding communities because the shredding process has the potential to release particulate materials and has a risk of causing fire. The current framework for hazardous waste does not include metal shredding facilities and therefore the facilities are not required to obtain a permit and are not regulated by the California Department of Toxics and Substance Control (DTSC). Without a comprehensive regulatory framework, DTSC on their own has begun to regulate the industry on a facility-by-facility basis using a hazardous waste enforcement framework, creating an uncertain and inconsistent legal environment, which has resulted in litigation.
“SB 811 will resolve this uncertainty, end the litigation, and ensure comprehensive and robust oversight and enforcement of metal shredding facilities under DTSC’s authority. This bill will ensure that California remains a sustainability leader in ‘reducing, reusing and recycling’ by fostering the recycling of scrap metal into new metal products, while at the same time protecting adjoining communities from environmental pollution.
“SB 811 includes provisions to address the governor’s veto message on SB 404.”
Why are we seeing this again? Despite clearing the Legislature with a 35-0 vote in the Senate and a 65-1 vote in the Assembly, SB 404 was vetoed by Governor Newsom on 10/13/2025. In his veto message, the Governor wrote, in part:
“…this bill lacks clear definitions regarding the materials processed at these facilities, including what "hazardous waste" requirements are applicable. Without this clarity, this bill is not as protective, places a significant burden on DTSC, and cannot be successfully implemented.
“I encourage the author to work closely with DTSC and interested parties to remedy this issue, as well as ensure that any future legislation requires metal shredding facilities operate, and be permitted to operate, in a health-protective manner.”
This bill represents the author’s efforts to do just that. There are minimal changes in this bill as compared to the version of SB 404 that was sent to the Governor’s desk, which will be discussed individually below.
- Clarifying applicability. In SB 404, provisions created in sections 25095.5 and 29095.8 apply requirements from existing hazardous waste regulations and statutes to “metal processing operations” authorized by framework the bill creates. In SB 811, the applicability of those regulations and statutes is clarified to apply some of the existing requirements in the HWCL and implementing regulations to metal shredding operations.
- Applying requirements but not labels. The other noteworthy change in this bill as compared to SB 404 involves the technical requirements regarding and classification of hazardous waste.
The last version of SB 404 before its final form that was sent to the Governor included a provision that would have applied any requirements from existing hazardous waste regulations and statutes to terms relating to hazardous waste in the bill. This was struck in the final version of the bill, and this bill brings it back.
However, beyond the language that was previously included in SB 404, this bill includes a new concept as well. That is that despite applying the “technical requirements” that pertain to hazardous waste to the material generated by metal shredders under certain circumstances, the bill would ensure those materials are not themselves classified as waste or hazardous waste.
By including this provision, this bill will apply some specific requirements that pertain to hazardous waste (e.g. site security, seismic safety, containment, and signage requirements, among others) that will help ensure the safety of metal shredding operations. However, by not classifying it as waste or hazardous, metal shredders will not be held to uniquely high standards for all elements of handling aggregate and MSR. This seems to be a reasonable attempt to strike a balance between applying existing best practices for safe handling while not stifling normal metal shredding operations, which may include materials that have hazardous properties during processing.
What is at stake? Regardless of the convoluted history or uncertain future of litigation surrounded metal shredders, two facts remain: the materials processed at these facilities represent a significant and complex waste stream, and processing those materials into more manageable or useful forms runs the risk of harming public health.
By proposing a new regulatory framework under DTSC, this bill attempts to thread these needles and assist metal shredders in their continued, reliable operation. If the new approach makes it too burdensome or costly to operate a metal shredding facility, the state may find itself ill-equipped to handle the volume of metal waste that is generated today. If, on the other hand, the new approach lowers the standards that currently apply to metal shredders, it could potentially worsen environmental injustices in a number of communities near metal shredders.
Although SB 404 was approved by the Legislature last year, this bill represents another opportunity to ensure all voices and views are adequately considered in the Legislation. As this bill moves forward, the author is encouraged to continue working closely with the affected communities, the regulated businesses, and the implementing entities.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According the Senate Appropriations Committee:
DTSC estimates ongoing costs of about $1.6 million annually beginning in fiscal year 2027-28 (Metal Shredders Facility Account or other special fund) for four positions due to increased oversight and regulatory workload as a result of this bill. Staff note that SB 811 would require that all oversight and permitting costs be reimbursed by metal shredder facilities and be deposited in the newly established Metal Shredders Facility Account. DTSC notes that this cost estimate is based on the number of shredders that currently operate in the state and DTSC’s current resources for metal shredder activities as authorized in the 2025 Budget Act. An increase or decrease in the number of metal shredders seeking permits and needing oversight, or a change in the department’s appropriation, might result in a change in resources required to implement this bill.
SUPPORT: (Verified 1/22/2026)
California Metal Recycling Coalition (Source)
Boys & Girls Clubs of the Los Angeles Harbor
California State Association of Electrical Workers
California State Pipe Trades Council
Central City Association of Los Angeles
Councilmember John Echavarria
Ecology Recycling Services
Grand Vision Foundation
South Colton Diversity Committee
Strength Based Community Change
Western States Council Sheet Metal, Air, Rail and Transportation
OPPOSITION: (Verified 1/22/2026)
Action Now
Alameda County Office of Education
Alameda; County of
California Communities Against Toxics
California Safe Schools
Clean Air Coalition of North Whittier and Avocado Heights
Comite Civico Del Valle
Comite Pro Uno
Del Amo Action Committee
Earthjustice
East Yard Communities for Environmental Justice
Greenaction for Health and Environmental Justice
Lincoln Heights Community Coalition
Los Angeles Unified School District
Natural Resources Defense Council
Phillipine Action Group for the Environment
San Francisco Baykeeper
West Oakland Environmental Indicators Project
Prepared by: Heather Walters / E.Q. / (916) 651-4108
1/26/26 13:22:05
**** END ****
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
SB 811 (Caballero) - Hazardous materials: metal shredding facilities
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would establish a new regulatory structure at the Department of Toxic Substances Control (DTSC) for metal shredding facilities.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on January 22, 2026
Fiscal Impact:
- DTSC estimates ongoing costs of about $1.6 million annually beginning in fiscal year 2027-28 (Metal Shredders Facility Account or other special fund) for four positions due to increased oversight and regulatory workload as a result of this bill. Staff note that SB 811 would require that all oversight and permitting costs be reimbursed by metal shredder facilities and be deposited in the newly established Metal Shredders Facility Account. DTSC notes that this cost estimate is based on the number of shredders that currently operate in the state and DTSC’s current resources for metal shredder activities as authorized in the 2025 Budget Act. An increase or decrease in the number of metal shredders seeking permits and needing oversight, or a change in the department’s appropriation, might result in a change in resources required to implement this bill.
Author Amendments:
These amendments would make explicit DTSC enforcement authority, specify included materials, and expand the scope of waters that need to be considered, among other things.
-- END --
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
SB 811 (Caballero) - Hazardous materials: metal shredding facilities
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would establish a new regulatory structure at the Department of Toxic Substances Control (DTSC) for metal shredding facilities.
Fiscal Impact:
- Ongoing costs would likely be between $1.2 and $2 million annually (Metal Shredders Facility Account or other special fund) based on the cost estimates of substantially similar past legislation.
Background:
Based on the hazardous characteristics of MSR, metal shredding facilities do generate hazardous waste and – prior to the late 1980s – were subject to hazardous waste requirements, including permitting, transportation and disposal.
However, in the late 1980s, in an effort to relax the requirements on metal shredding facilities, the Department of Health Services (DHS) – the predecessor of DTSC – determined treating MSR using chemical stabilization techniques could effectively eliminate the harm posed by MSR. As a result, this waste was determined – when properly treated – to no longer pose a significant hazard to human health and safety, livestock, and wildlife.
Following this determination, seven metal shredding facilities applied for and were granted nonhazardous waste classification letters by DHS, and later DTSC, as long as they used the metal treatment fixation technologies approved by the state. Known as “f letters,” these classifications ultimately allowed treated MSR to be handled, transported, and disposed of as non-hazardous waste in class III landfills (i.e., solid (non-hazardous) waste landfills).
In November 1988, DTSC issued “Official Policy/Procedures #88-6 Auto Shredder Waste Policy and Procedures”, better known as OPP #88-6. The policy classified metal shredder aggregate as in-process material, not a waste that needed to be regulated under the state’s HWCL.
More than 30 years after it was established OPP #88-6 was unilaterally administratively rescinded by DTSC in October 2021. DTSC stated the policy was inexact, self-contradictory and in conflict with federal and state law.
One month later, in November 2021, Pacific Auto Recycling Center (PARC) filed a complaint against DTSC asking for OPP #88-6 to be re-instated. PARC argued the DTSC policy was actually a regulation under the state’s Administrative Procedure Act (APA) and as such, DTSC couldn’t simply erase OPP #88-6 without going through the APA’s regulatory process.
In June 2023, the trial court agreed with PARC, ordered DTSC to re-instate OPP #88-6, and stated DTSC needed to go through the APA if it wished to rescind OPP #88-6.
In November 2021, the Institute of Scrap Recycling Industries (ISRI) and several individual companies filed suit against DTSC following its adoption of emergency regulations to remove metal shredder aggregate – the ferrous and non-ferrous metals that are recycled – from the definition of scrap metal, which effectively subjected the material to the state’s HWCL.
In March 2022, the court granted ISRI’s request to prevent the regulation from taking effect but did not rule on the underlying merits of the case and after the injunction was granted, DTSC allowed the emergency regulation to expire. The remaining claims on the merits have been consolidated with a different 2019 case pending before the court and is expected to go to trial in late 2026.
Proposed Law:
This bill would:
- Prohibit a metal shredding facility from operating in California, unless it has a permit issued by DTSC.
- Provide metal shredding facilities regulated under this bill are not hazardous waste facilities, but does not alter or override the authority of DTSC or a CUPA to regulate ancillary hazardous waste generated at a metal shredding facility.
- Make it clear local air pollution control districts, air quality management districts, CUPAs, and local environmental health departments do not lose any authority to regulate metal shredding facilities.
- Authorize DTSC to adopt, update and revise regulations to implement this bill.
- Authorize an existing metal shredding facility operating in compliance with this bill, to continue to operate pending final action on a permit application. Facilities must have developed and continuously implement a fire prevention, detection, and response plan and comply with the limitations on pile volume and duration set forth in this bill. DTSC is permitted to take enforcement action against a non-compliant facility prior to issuing a final permit.
- Require DTSC, before issuing a permit, to determine the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities.
- Require DTSC to impose any additional facility-specific conditions necessary to ensure compliance with this bill and for the protection of human health and the environment.
- Require an applicant, before submitting a permit application or application for permit renewal, to hold at least one public meeting, or other community engagement activity approved by DTSC, to inform the community of metal processing activities and any potential impacts to nearby communities – and to solicit questions and input from the public.
- Authorize a metal shredding facility to make certain physical or operational changes to the facility without getting prior approval from DTSC.
- Subject metal shredder aggregate, including light fibrous material (LFM), which is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, to regulation as hazardous waste under the Hazardous Waste Control Law (HWCL), if it exhibits a characteristic of hazardous waste.
- Require a metal shredding facility to provide DTSC with immediate notice of a fire or other incident at the metal shredding facility that requires the assistance of a local fire department or other first responder.
- Require a metal shredding facility to establish an effective means of providing public notice to members of the surrounding community when a fire or other incident that poses a threat to human health or the environment outside of the facility takes place.
- Authorize DTSC to deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility under this bill.
- Exempt from the definition of hazardous waste, under the HWCL: chemically treated metal shredder residue (if treated according to the provisions of this bill); scrap metal; metal shredder aggregate (managed in accordance with the requirements of this bill); intermediate metal products that are subject to further processing to improve product quality; finished ferrous and nonferrous metal commodities that are separated or removed from metal shredder aggregate at a metal shredding facility; and, nonmetallic recyclable items recovered from metal shredder aggregate for which a market exists.
Related Legislation:
SB 404 (Caballero, 2025) was substantially similar to SB 811 and was vetoed by Governor Newsom.
AB 2851 (Bonta, Chapter 743, Statutes of 2024) imposed various fence-line monitoring requirements to assess air pollution impacts from metal shredding facilities.
Staff Comments:
Despite clearing the Legislature with a 35-0 vote in the Senate and a 65-1 vote in the Assembly, SB 404 was vetoed by Governor Newsom on 10/13/2025. In his veto message, the Governor wrote, in part:
“…this bill lacks clear definitions regarding the materials processed at these facilities, including what "hazardous waste" requirements are applicable. Without this clarity, this bill is not as protective, places a significant burden on DTSC, and cannot be successfully implemented.”
I encourage the author to work closely with DTSC and interested parties to remedy this issue, as well as ensure that any future legislation requires metal shredding facilities operate, and be permitted to operate, in a health-protective manner.”
This bill represents the author’s efforts to do just that. There are effectively only two changes in SB 881 as compared to the version of SB 404 that was sent to the Governor’s desk, which will be discussed individually below.
- “… and to the materials processed by those operations.” In SB 404, provisions created in sections 25095.5 and 29095.8 apply requirements from existing hazardous waste regulations and statutes to “metal processing operations” authorized by framework the bill creates.
In SB 811, the applicability of those regulations and statutes is changed to “metal processing operations authorized pursuant to this chapter and to the materials processed by those operations.” Some of the existing requirements in the HWCL and implementing regulations pertain specifically to “hazardous waste” or “hazardous waste facilities” but may still be relevant to metal shredding operations. Adding “and to the materials processed by those operations” ensures that there is no ambiguity about the applicability of existing requirements to the material handled by metal shredders, even if it is not designated as “hazardous waste.” - Applying requirements but not labels. The other noteworthy change in SB 811 as compared to SB 404 involves the technical requirements regarding and classification of hazardous waste.
The last version of SB 404 before its final form that was sent to the Governor included a provision that would have applied any requirements from existing hazardous waste regulations and statutes to terms relating to hazardous waste in the bill. This was struck in the final version of the bill, and SB 811 brings it back.
However, beyond the language that was previously included in SB 404, SB 811 includes a new concept as well. That is that despite applying the “technical requirements” that pertain to hazardous waste to the material generated by metal shredders under certain circumstances, the bill would ensure those materials are not themselves classified as waste or hazardous waste.
By including this provision, SB 811 will apply some specific requirements that pertain to hazardous waste (e.g. site security, seismic safety, containment, and signage requirements, among others) that will help ensure the safety of metal shredding operations. However, by not classifying it as waste or hazardous, metal shredders will not be held to uniquely high standards for all elements of handling aggregate and MSR. This seems to be a reasonable attempt to strike a balance between applying existing best practices for safe handling while not stifling normal metal shredding operations, which may include materials that have hazardous properties during processing.
-- END --
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Blakespear, Chair
2025 - 2026 Regular
Bill No: SB 811
Author: | Caballero | ||
Version: | 1/5/2026 | Hearing Date: | 1/13/2025 |
Urgency: | No | Fiscal: | Yes |
Consultant: | Heather Walters | ||
SUBJECT: Hazardous materials: metal shredding facilities
DIGEST: This bill establishes a new regulatory structure at the Department of Toxic Substances Control for metal shredding facilities.
ANALYSIS:
Existing law:
- Defines a “metal shredding facility” as an operation that uses a shredding technique to process end-of-life vehicles, appliances, and other forms of scrap metal to help separate and sort ferrous metals, nonferrous metals, and other recyclable materials from non-recyclable materials.
- Allows DTSC in consultation with the Department of Resources Recycling and Recovery (CalRecycle), the State Water Resources Control Board (SWRCB), and local air districts to adopt regulations to set management standards for metal shredding facilities. These standards are used to regulate these facilities in lieu of standards set out in the Hazardous Waste Control Law (HWCL).
- Precludes DTSC from adopting management standards that are less stringent than standards set by federal law.
- Allows waste from a metal shredder (known as metal shredder residue or MSR) to be classified and managed as nonhazardous waste, provided certain standards are met. Such nonhazardous waste can be used as alternative daily cover or for beneficial reuse, or it may be disposed of if it complies with regulations in the Water Code.
- Allows DTSC to assess a fee on metal shredding facilities to cover the cost of the program.
- Deems treated MSR managed under the standards set in law as solid waste when it is accepted by a solid waste landfill or other authorized location for disposal or for use as alternative daily cover or other beneficial use.
This bill:
- Prohibits a metal shredding facility from operating in California, unless it has a permit issued by DTSC.
- Provides metal shredding facilities regulated under this bill are not hazardous waste facilities, but does not alter or override the authority of DTSC or a CUPA to regulate ancillary hazardous waste generated at a metal shredding facility.
- Makes it clear local air pollution control districts, air quality management districts, CUPAs, and local environmental health departments do not lose any authority to regulate metal shredding facilities.
- Authorizes DTSC to adopt, update and revise regulations to implement this bill.
- Authorizes an existing metal shredding facility operating in compliance with this bill, to continue to operate pending final action on a permit application. Facilities must have developed and continuously implement a fire prevention, detection, and response plan and comply with the limitations on pile volume and duration set forth in this bill. DTSC is permitted to take enforcement action against a non-compliant facility prior to issuing a final permit.
- Requires DTSC, before issuing a permit, to determine the facility does not pose a significant threat to public health or the environment and will not cause disproportionate and potentially discriminatory impacts on local communities.
- Requires DTSC to impose any additional facility-specific conditions necessary to ensure compliance with this bill and for the protection of human health and the environment.
- Requires an applicant, before submitting a permit application or application for permit renewal, to hold at least one public meeting, or other community engagement activity approved by DTSC, to inform the community of metal processing activities and any potential impacts to nearby communities – and to solicit questions and input from the public.
- Authorizes a metal shredding facility to make certain physical or operational changes to the facility without getting prior approval from DTSC.
- Subjects metal shredder aggregate, including light fibrous material (LFM), which is either released into the environment during transportation, or released beyond the property boundaries of the metal shredding facility, to regulation as hazardous waste under the Hazardous Waste Control Law (HWCL), if it exhibits a characteristic of hazardous waste.
- Requires a metal shredding facility to provide DTSC with immediate notice of a fire or other incident at the metal shredding facility that requires the assistance of a local fire department or other first responder.
- Requires a metal shredding facility to establish an effective means of providing public notice to members of the surrounding community when a fire or other incident that poses a threat to human health or the environment outside of the facility takes place.
- Authorizes DTSC to deny, revoke, or suspend a permit authorizing the operation of a metal shredding facility under this bill.
- Exempts from the definition of hazardous waste, under the HWCL: chemically treated metal shredder residue (if treated according to the provisions of this bill); scrap metal; metal shredder aggregate (managed in accordance with the requirements of this bill); intermediate metal products that are subject to further processing to improve product quality; finished ferrous and nonferrous metal commodities that are separated or removed from metal shredder aggregate at a metal shredding facility; and, nonmetallic recyclable items recovered from metal shredder aggregate for which a market exists.
Background
- California Hazardous Waste Control Law (HWCL). The HWCL is the state's program that implements and enforces federal hazardous waste laws in California and directs DTSC to oversee and implement the state’s hazardous waste laws and regulations. Any person who stores, treats, or disposes of hazardous waste must obtain a permit from DTSC. The HWCL covers the entire management lifecycle of hazardous waste, from generation, to management, transportation, and ultimately disposal into a state or federal authorized facility.
- What Do Metal Shredders Do & Produce? DTSC defines a metal shredder as an entity that processes end-of-life vehicles, appliances, and other forms of scrap metal, separates recyclable materials from non-recyclable materials, and then sells the recyclable materials and disposes of the non-recyclable materials. There are about 10 metal shredding operations in the state today.
- A brief history of California metal shredder regulation and litigation. Based on the hazardous characteristics of MSR, metal shredding facilities do generate hazardous waste and – prior to the late 1980s – were subject to hazardous waste requirements, including permitting, transportation and disposal.
However, in the late 1980s, in an effort to relax the requirements on metal shredding facilities, the Department of Health Services (DHS) – the predecessor of DTSC – determined treating MSR using chemical stabilization techniques could effectively eliminate the harm posed by MSR. As a result, this waste was determined – when properly treated – to no longer pose a significant hazard to human health and safety, livestock, and wildlife.
Following this determination, seven metal shredding facilities applied for and were granted nonhazardous waste classification letters by DHS, and later DTSC, as long as they used the metal treatment fixation technologies approved by the state. Known as “f letters,” these classifications ultimately allowed treated MSR to be handled, transported, and disposed of as non-hazardous waste in class III landfills (i.e., solid (non-hazardous) waste landfills).
In November 1988, DTSC issued “Official Policy/Procedures #88-6 Auto Shredder Waste Policy and Procedures”, better known as OPP #88-6. The policy classified metal shredder aggregate as in-process material, not a waste that needed to be regulated under the state’s HWCL.
More than 30 years after it was established OPP #88-6 was unilaterally administratively rescinded by DTSC in October 2021. DTSC stated the policy was inexact, self-contradictory and in conflict with federal and state law.
One month later, in November 2021, Pacific Auto Recycling Center (PARC) filed a complaint against DTSC asking for OPP #88-6 to be re-instated. PARC argued the DTSC policy was actually a regulation under the state’s Administrative Procedure Act (APA) and as such, DTSC couldn’t simply erase OPP #88-6 without going through the APA’s regulatory process.
In June 2023, the trial court agreed with PARC, ordered DTSC to re-instate OPP #88-6, and stated DTSC needed to go through the APA if it wished to rescind OPP #88-6.
In November 2021, the Institute of Scrap Recycling Industries (ISRI) and several individual companies filed suit against DTSC following its adoption of emergency regulations to remove metal shredder aggregate – the ferrous and non-ferrous metals that are recycled – from the definition of scrap metal, which effectively subjected the material to the state’s HWCL.
In March 2022, the court granted ISRI’s request to prevent the regulation from taking effect but did not rule on the underlying merits of the case and after the injunction was granted, DTSC allowed the emergency regulation to expire. The remaining claims on the merits have been consolidated with a different 2019 case pending before the court and is expected to go to trial in late 2026.
Comments
- Purpose of Bill. According to the author, “Metal shredding facilities recycle millions of end-of-life vehicles, household appliances, and other metallic items produced, used, and discarded annually in California. Unless recycled, these metal materials would rapidly overwhelm all available landfill capacity, creating a massive accumulation of damaged and abandoned cars, appliances, and other items.
“Metal shredding poses environmental concerns to surrounding communities because the shredding process has the potential to release particulate materials and has a risk of causing fire. The current framework for hazardous waste does not include metal shredding facilities and therefore the facilities are not required to obtain a permit and are not regulated by the California Department of Toxics and Substance Control (DTSC). Without a comprehensive regulatory framework, DTSC on their own has begun to regulate the industry on a facility-by-facility basis using a hazardous waste enforcement framework, creating an uncertain and inconsistent legal environment, which has resulted in litigation.
“SB 811 will resolve this uncertainty, end the litigation, and ensure comprehensive and robust oversight and enforcement of metal shredding facilities under DTSC’s authority. This bill will ensure that California remains a sustainability leader in ‘reducing, reusing and recycling’ by fostering the recycling of scrap metal into new metal products, while at the same time protecting adjoining communities from environmental pollution.
“SB 811 includes provisions to address the governor’s veto message on SB 404.” - Why are we seeing this again? Despite clearing the Legislature with a 35-0 vote in the Senate and a 65-1 vote in the Assembly, SB 404 was vetoed by Governor Newsom on 10/13/2025. In his veto message, the Governor wrote, in part:
“…this bill lacks clear definitions regarding the materials processed at these facilities, including what "hazardous waste" requirements are applicable. Without this clarity, this bill is not as protective, places a significant burden on DTSC, and cannot be successfully implemented.”
I encourage the author to work closely with DTSC and interested parties to remedy this issue, as well as ensure that any future legislation requires metal shredding facilities operate, and be permitted to operate, in a health-protective manner.”
This bill represents the author’s efforts to do just that. There are effectively only two changes in SB 881 as compared to the version of SB 404 that was sent to the Governor’s desk, which will be discussed individually below.
- “… and to the materials processed by those operations.” In SB 404, provisions created in sections 25095.5 and 29095.8 apply requirements from existing hazardous waste regulations and statutes to “metal processing operations” authorized by framework the bill creates.
In SB 811, the applicability of those regulations and statutes is changed to “metal processing operations authorized pursuant to this chapter and to the materials processed by those operations.” Some of the existing requirements in the HWCL and implementing regulations pertain specifically to “hazardous waste” or “hazardous waste facilities” but may still be relevant to metal shredding operations. Adding “and to the materials processed by those operations” ensures that there is no ambiguity about the applicability of existing requirements to the material handled by metal shredders, even if it is not designated as “hazardous waste.” - Applying requirements but not labels. The other noteworthy change in SB 811 as compared to SB 404 involves the technical requirements regarding and classification of hazardous waste.
The last version of SB 404 before its final form that was sent to the Governor included a provision that would have applied any requirements from existing hazardous waste regulations and statutes to terms relating to hazardous waste in the bill. This was struck in the final version of the bill, and SB 811 brings it back.
However, beyond the language that was previously included in SB 404, SB 811 includes a new concept as well. That is that despite applying the “technical requirements” that pertain to hazardous waste to the material generated by metal shredders under certain circumstances, the bill would ensure those materials are not themselves classified as waste or hazardous waste.
By including this provision, SB 811 will apply some specific requirements that pertain to hazardous waste (e.g. site security, seismic safety, containment, and signage requirements, among others) that will help ensure the safety of metal shredding operations. However, by not classifying it as waste or hazardous, metal shredders will not be held to uniquely high standards for all elements of handling aggregate and MSR. This seems to be a reasonable attempt to strike a balance between applying existing best practices for safe handling while not stifling normal metal shredding operations, which may include materials that have hazardous properties during processing.
- “… and to the materials processed by those operations.” In SB 404, provisions created in sections 25095.5 and 29095.8 apply requirements from existing hazardous waste regulations and statutes to “metal processing operations” authorized by framework the bill creates.
- What is at stake? Regardless of the convoluted history or uncertain future of litigation surrounded metal shredders, two facts remain: the materials processed at these facilities represent a significant and complex waste stream, and processing those materials into more manageable or useful forms runs the risk of harming public health.
By proposing a new regulatory framework under DTSC, SB 811 attempts to thread these needles and assist metal shredders in their continued, reliable operation. If the new approach makes it too burdensome or costly to operate a metal shredding facility, the state may find itself ill-equipped to handle the volume of metal waste that is generated today. If, on the other hand, the new approach lowers the standards that currently apply to metal shredders, it could potentially worsen environmental injustices in a number of communities near metal shredders.
Although SB 404 was approved by the Legislature last year, SB 811 represents another opportunity to ensure all voices and views are adequately considered in the Legislation. As this bill moves forward, should the Committee advance it today, the author is encouraged to continue working closely with the affected communities, the regulated businesses, and the implementing entities.
Related/Prior Legislation
SB 404 (Caballero, 2025) was substantially similar to SB 811, save for the provisions discussed in comment #2. SB 404 was vetoed by Governor Newsom.
AB 2851 (Bonta, Chapter 743, Statutes of 2024) imposed various fence-line monitoring requirements to assess air pollution impacts from metal shredding facilities.
SOURCE:
California Metal Recyclers Coalition
SUPPORT:
Boys & Girls Clubs of the Los Angeles Harbor
California State Association of Electrical Workers
California State Pipe Trades Council
Central City Association of Los Angeles
Councilmember John Echavarria
Ecology Recycling Services
Grand Vision Foundation
Metal Recycling Coalition
South Colton Diversity Committee
Strength Based Community Change
Western States Council Sheet Metal, Air, Rail and Transportation
OPPOSITION:
Action Now
Alameda County Office of Education
Alameda; County of
California Communities Against Toxics
California Safe Schools
Clean Air Coalition of North Whittier and Avocado Heights
Comite Civico Del Valle
Comite Pro Uno
Del Amo Action Committee
Earthjustice
East Yard Communities for Environmental Justice
Greenaction for Health and Environmental Justice
Lincoln Heights Community Coalition
Los Angeles Unified School District
Natural Resources Defense Council
Phillipine Action Group for the Environment
San Francisco Baykeeper
West Oakland Environmental Indicators Project
-- END --
Bill Author
Bill Co-Author(s):