SB 842: Energy: firm zero-carbon resources.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2025-06-27
Current Status:
In Progress
(2025-08-29: August 29 hearing: Held in committee and under submission.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires electrical corporations to submit information to the commission for various purposes, as provided.
This bill would require the commission, on or before December 31, 2026, to produce a report identifying opportunities and needs to provide for local and system reliability with firm zero-carbon resources over the short term, midterm, and long term, as provided. The bill would require the report to include, among other things, characterization of the resource attributes vital for local and system reliability and identification of barriers, including market barriers, to deploying firm zero-carbon resources to enhance local and system reliability.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and because a violation of a commission action implementing those provisions would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the PUC Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires electrical corporations to submit information to the PUC commission for various purposes, as provided.
This bill would require the Energy Commission, on or before July 1, 2026, through a new or ongoing proceeding, to identify programs it administers that provide, or could provide, financial support to deploy firm zero-carbon resources, mechanisms to use uncommitted or newly authorized funds in a manner that maximizes system and local reliability benefits and affordability outcomes, and the expected scope of energy resources that could be deployed based on current and expected funding availability, as provided. The bill would require the PUC, commission, on or before December 31, 2026, to produce a report identifying opportunities and needs to provide for local reliability with firm zero-carbon resources over the short term, midterm, and long term, as provided. The bill would require the PUC, beginning on or before July 1, 2027, to evaluate resources necessary to optimize local reliability at least cost. The bill would require the PUC, as part of the evaluation, to ensure that each load-serving entitys integrated resource plan considers all reasonable new resource options that could be deployed to meet local reliability requirements at least cost. The bill would require the report to include, among other things, characterization of the resource attributes vital for local reliability and identification of barriers, including market barriers, to deploying firm zero-carbon resources to enhance local reliability.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC commission is a crime.
Because certain the provisions of this bill would be a part of the act and because a violation of a PUC commission action implementing those provisions would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the Public Utilities Commission (PUC), the Independent System Operator, and the State Air Resources Board, on or before December 31, 2023, to submit to the Legislature an assessment of the firm zero-carbon resources that support a clean, reliable, and resilient electrical grid in California and will achieve the policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of all retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045, as specified.
Existing law vests the PUC with regulatory authority over public utilities, including electrical corporations. Existing law requires electrical corporations to submit information to the PUC for various purposes, as provided.
This bill would require the Energy Commission, on or before July 1, 2026, through a new or ongoing proceeding, to identify programs it administers that provide, or could provide, financial support to deploy firm zero-carbon resources, mechanisms to use uncommitted or new newly authorized funds in a manner that maximizes system and local reliability benefits and affordability outcomes, as provided, and the expected scope of energy resources that could be deployed based on current and expected funding availability. The bill would require the PUC, on or before December 31, 2026, through a new or ongoing proceeding, to establish or identify a process by which each load-serving entity subject to its jurisdiction may solicit bids and propose projects for new firm zero-carbon resources to meet identified local reliability needs, as provided. availability, as provided. The bill would require the PUC, on or before December 31, 2026, to produce a report identifying opportunities and needs to provide for local reliability with firm zero-carbon resources over the short term, midterm, and long term, as provided. The bill would require the PUC, beginning on or before December 31, 2026, July 1, 2027, to evaluate resources necessary to optimize local reliability at least cost. The bill would require the PUC, as part of the evaluation, to ensure that each load-serving entitys integrated resource plan considers all reasonable new resource options that could be deployed to meet local reliability requirements at least cost and that each load-serving entity take reasonable actions to ensure that an appropriate proportion of new resource development occurs in local reliability areas. cost.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain provisions of this bill would be a part of the act and because a violation of a PUC action implementing those provisions would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the Public Utilities Commission, Commission (PUC), the Independent System Operator, and the State Air Resources Board, on or before December 31, 2023, to submit to the Legislature an assessment of the firm zero-carbon resources that support a clean, reliable, and resilient electrical grid in California and will achieve the policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of all retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045, as specified.
This bill would state that it is the intent of the legislature to enact future legislation to support the deployment of firm zero-carbon energy resources in order to enhance local reliability, improve grid resilience, and reduce ongoing ratepayer costs.Existing law vests the PUC with regulatory authority over public utilities, including electrical corporations. Existing law requires electrical corporations to submit information to the PUC for various purposes, as provided.
This bill would require the Energy Commission, on or before July 1, 2026, through a new or ongoing proceeding, to identify programs it administers that provide, or could provide, financial support to deploy firm zero-carbon resources, mechanisms to use uncommitted or new authorized funds in a manner that maximizes system and local reliability benefits and affordability outcomes, as provided, and the expected scope of energy resources that could be deployed based on current and expected funding availability. The bill would require the PUC, on or before December 31, 2026, through a new or ongoing proceeding, to establish or identify a process by which each load-serving entity subject to its jurisdiction may solicit bids and propose projects for new firm zero-carbon resources to meet identified local reliability needs, as provided. The bill would require the PUC, on or before December 31, 2026, to produce a report identifying opportunities and needs to provide for local reliability with firm zero-carbon resources over the short term, midterm, and long term, as provided. The bill would require the PUC, beginning on or before December 31, 2026, to evaluate resources necessary to optimize local reliability at least cost. The bill would require the PUC, as part of the evaluation, to ensure that each load-serving entitys integrated resource plan considers all reasonable new resource options that could be deployed to meet local reliability requirements at least cost and that each load-serving entity take reasonable actions to ensure that an appropriate proportion of new resource development occurs in local reliability areas.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain provisions of this bill would be a part of the act and because a violation of a PUC action implementing those provisions would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the Public Utilities Commission, the Independent System Operator, and the State Air Resources Board, on or before December 31, 2023, to submit to the Legislature an assessment of the firm zero-carbon resources that support a clean, reliable, and resilient electrical grid in California and will achieve the policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of all retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045, as specified.
This bill would state that it is the intent of the legislature to enact future legislation to support the deployment of firm zero-carbon energy resources in order to enhance local reliability, improve grid resilience, and reduce ongoing ratepayer costs.
The Legislature finds and declares all of the following:
(a)Firm zero-carbon resources, which include renewable resources that can, along with other resources, provide nonemitting firm dispatchable capacity, are essential to advancing Californias clean energy goals and ensuring a reliable, resilient, and affordable electricity system, including in the face of growing challenges posed by extended weather events and wildfire risks.
(b)Firm zero-carbon resources are not fully represented or valued in the states energy planning processes or market rules, which may lead to suboptimal energy and cost outcomes.
(c)Enabling the widest array of clean energy resources, including firm zero-carbon resources, to participate in the states energy markets as soon as possible will maximize competition and innovation, and deliver the most affordable energy outcomes for California ratepayers.
SEC. 2.Section 380.6 is added to the Public Utilities Code, to read:380.6.(a)For purposes of this section, all of the following definitions apply:
(1)Firm zero-carbon resources has the same meaning as defined in Section 25216.7 of the Public Resources Code.
(2)Long term, midterm, and short term have the same meanings as defined in Section 454.52.
(b)On or before December 31, 2026, in consultation with the Independent System Operator, the commission shall produce a report identifying opportunities and needs to provide for local and system reliability with firm zero-carbon resources over the short term, midterm, and long term.
(c)The report produced pursuant to subdivision (b) shall include all of the following:
(1)Characterization of the resource attributes vital for local and system reliability, and identification of firm zero-carbon resources capable of providing those attributes.
(2)Development of scenarios identifying the scale of firm zero-carbon resource needs to provide local and system reliability over the short term, midterm, and long term, accounting for economic retirements of available infrastructure and based on reliability needs.
(3)Identification of priority regions for deploying firm zero-carbon resources to provide local and system reliability over the short term and midterm, based on the scenarios and considerations identified in paragraph (2).
(4)Identification of barriers, including market barriers, to deploying firm zero-carbon resources to enhance local and system reliability.
(5)Identification of solutions to overcome barriers identified in paragraph (4), including potential changes to market products or new services that may be requiredsuch as multiday firm capacity products, flexible ramping products, or other firm energy supply obligations that could incentivize the long-term development of firm zero-carbon resources needed to meet the states energy goals and achieve the outcomes of this section.
(6)Identification of implementation timelines, regulatory processes, or stakeholder engagement steps required to adopt those changes.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares all of the following:
(a)Firm zero-carbon resources, which include renewable resources that can, along with other resources, provide nonemitting firm dispatchable capacity, are essential to advancing Californias clean energy goals and ensuring a reliable, resilient, and affordable electricity system, including in the face of growing challenges posed by extended weather events and wildfire risks.
(b)Firm zero-carbon resources are not fully represented or valued in the states energy planning processes or market rules, which may lead to suboptimal energy and cost outcomes.
(c)Several funding programs can be aligned to support the deployment of firm zero-carbon resources and other technologies needed to enhance system and local reliability and meet the states clean energy and affordability goals.(d)(c)Enabling the widest array of clean energy resources, including firm zero-carbon resources, to participate in the states energy markets as soon as possible will maximize competition and innovation, and deliver the most affordable energy outcomes for California ratepayers.
SEC. 2.Section 25216.2 is added to the Public Resources Code, to read:25216.2.(a)For purposes of this section, all of the following definitions apply:(1)Firm zero-carbon resources has the same meaning as defined in Section 25216.7.(2)Long term, midterm, and short term have the same meanings as defined in Section 454.52 of the Public Utilities Code.(b)On or before July 1, 2026, through a new or ongoing proceeding, the commission shall do all of the following in relation to firm zero-carbon resources:(1)Identify programs administered by the commission that provide, or could provide, financial support to deploy firm zero-carbon resources, including energy storage, to enhance system and local reliability of Californias electrical grid in the long term, midterm, and short term.(2)Identify mechanisms to use uncommitted or newly authorized funds in a manner that maximizes system and local reliability benefits and affordability outcomes in the short term and midterm.(3)Identify the expected scope of energy resources that could be deployed based on current and expected funding availability and the associated attributes in the long term, midterm, and short term, including all of the following:(A)Total capacity, on a megawatt basis, and, for energy storage, on a megawatt and megawatthour basis.(B)Expected benefits to energy reliability, including system and local reliability.(C)Any expected deficiencies, on a megawatt or megawatthour basis, to energy reliability, including system and local reliability.(D)Proposed funding needs of currently operating programs to address any expected deficiencies in energy reliability, including system and local reliability, especially in the midterm and short term.SEC. 3.SEC. 2.Section 380.6 is added to the Public Utilities Code, to read:380.6.(a)For purposes of this section, all of the following definitions apply:
(1)Firm zero-carbon resources has the same meaning as defined in Section 25216.7 of the Public Resources Code.
(2)Long term, midterm, and short term have the same meanings as defined in Section 454.52.
(b)On or before December 31, 2026, in consultation with the Independent System Operator, the commission shall produce a report identifying opportunities and needs to provide for local reliability with firm zero-carbon resources over the short term, midterm, and long term.
(c)The report produced pursuant to subdivision (b) shall include all of the following:
(1)Characterization of the resource attributes vital for local reliability, and identification of firm zero-carbon resources capable of providing those attributes.
(2)Development of scenarios identifying the scale of firm zero-carbon resource needs to provide local reliability over the short term, midterm, and long term, accounting for economic retirements of available infrastructure and based on reliability needs.
(3)Identification of priority regions for deploying firm zero-carbon resources to provide local reliability over the short term and midterm, based on the scenarios and considerations identified in paragraph (2).
(4)Identification of barriers, including market barriers, to deploying firm zero-carbon resources to enhance local reliability.
(5)Identification of solutions to overcome barriers identified in paragraph (4), including potential changes to market products or new services that may be requiredsuch as multiday firm capacity products, flexible ramping products, or other firm energy supply obligations that could incentivize the long-term development of firm zero-carbon resources needed to meet the states energy goals and achieve the outcomes of this section.
(6)Identification of implementation timelines, regulatory processes, or stakeholder engagement steps required to adopt those changes.
SEC. 4.Section 454.62 is added to the Public Utilities Code, to read:454.62.(a)For purposes of this section, all of the following definitions apply:(1)Firm zero-carbon resources has the same meaning as defined in Section 25216.7 of the Public Resources Code.(2)Load-serving entity has the same meaning as defined in Section 380.(b)Beginning on or before July 1, 2027, pursuant to the process described in Section 454.52, the commission shall evaluate resources necessary to optimize local reliability at least cost, consistent with the goals of Section 454.53.(c)As part of the evaluation, the commission shall ensure that each load-serving entitys integrated resource plan considers all reasonable new resource options that could be deployed to meet local reliability requirements at least cost, including firm zero-carbon resources with the attributes described in Section 380.1.SEC. 5.SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares all of the following:
(a)Firm zero-carbon resources, which include renewable resources that can, along with other resources, provide nonemitting firm dispatchable capacity, are essential to advancing Californias clean energy goals and ensuring a reliable, resilient, and affordable electricity system, including in the face of growing challenges posed by extended weather events and wildfire risks.
(b)Firm zero-carbon resources are not fully represented or valued in the states energy planning processes or market rules, which may lead to suboptimal energy and cost outcomes.
(c)Several funding programs can be aligned to support the deployment of firm zero-carbon resources and other technologies needed to enhance system and local reliability and meet the states clean energy and affordability goals.
(d)Enabling the widest array of clean energy resources, including firm zero-carbon resources, to participate in the states energy markets as soon as possible will maximize competition and innovation, and deliver the most affordable energy outcomes for California ratepayers.
SEC. 2.Section 25216.2 is added to the Public Resources Code, to read:25216.2.(a)For purposes of this section, all of the following definitions apply:
(1)Firm zero-carbon resources has the same meaning as defined in Section 25216.7.
(2)Long term, midterm, and short term have the same meanings as defined in Section 454.52 of the Public Utilities Code.
(b)On or before July 1, 2026, through a new or ongoing proceeding, the commission shall do all of the following in relation to firm zero-carbon resources:
(1)Identify programs administered by the commission that provide, or could provide, financial support to deploy firm zero-carbon resources, including energy storage, to enhance system and local reliability of Californias electrical grid in the long term, midterm, and short term.
(2)Identify mechanisms to use uncommitted or newly authorized funds in a manner that maximizes system and local reliability benefits and affordability outcomes in the short term and midterm.
(3)Identify the expected scope of energy resources that could be deployed based on current and expected funding availability and the associated attributes in the long term, midterm, and short term, including all of the following:
(A)Total capacity, on a megawatt basis, and and, for energy storage, on a megawatt and megawatthour basis.
(B)Expected benefits to energy reliability, including system and local reliability.
(C)Any expected deficiencies, on a megawatt or megawatthour basis, to energy reliability, including system and local reliability.
(D)Proposed funding needs of currently operating programs to address any expected deficiencies in energy reliability, including system and local reliability, especially in the midterm and short term.
SEC. 3.Section 380.1 is added to the Public Utilities Code, to read:380.1.(a)For purposes of this section, firm zero-carbon resources has the same meaning as defined in Section 25216.7 of the Public Resources Code.(b)On or before December 31, 2026, through a new or ongoing proceeding, the commission shall establish or identify a current process by which each load-serving entity, as defined in Section 380, subject to its jurisdiction may solicit bids and propose projects for new firm zero-carbon resources to meet identified local reliability needs.(c)The process shall be designed to identify and consider approval of projects that achieve all of the following outcomes:(1)Deploy least cost options for providing local reliability using firm zero-carbon resources.(2)Enhance grid reliability during electrical grid stress conditions that may persist for multiple days.(3)Increase resource diversity in the state.(4)Reduce emissions in low-income and disadvantaged communities.(5)Support efforts to improve electrical affordability.SEC. 4.SEC. 3.Section 380.6 is added to the Public Utilities Code, to read:380.6.(a)For purposes of this section, all of the following definitions apply:
(1)Firm zero-carbon resources has the same meaning as defined in Section 25216.7 of the Public Resources Code.
(2)Long term, midterm, and short term have the same meanings as defined in Section 454.52.
(b)On or before December 31, 2026, in consultation with the Independent System Operator, the commission shall produce a report identifying opportunities and needs to provide for local reliability with firm zero-carbon resources over the short term, midterm, and long term.
(c)The report produced pursuant to subdivision (b) shall include all of the following:
(1)Characterization of the resource attributes vital for local reliability, and identification of firm zero-carbon resources capable of providing those attributes.
(2)Development of scenarios identifying the scale of firm zero-carbon resource needs to provide local reliability over the short term, midterm, and long term, accounting for economic retirements of available infrastructure and based on reliability needs.
(3)Identification of priority regions for deploying firm zero-carbon resources to provide local reliability over the short term and midterm, based on the scenarios and considerations identified in paragraph (2).
(4)Identification of barriers, including market barriers, to deploying firm zero-carbon resources to enhance local reliability.
(5)Identification of solutions to overcome barriers identified in paragraph (4), including potential changes to market products or new services that may be requiredsuch as multiday firm capacity products, flexible ramping products, or other firm energy supply obligations that could incentivize the long-term development of firm zero-carbon resources needed to meet the states energy goals and achieve the outcomes of this section.
(6)Identification of implementation timelines, regulatory processes, or stakeholder engagement steps required to adopt those changes.
(d)The commission may propose pilot or demonstration market mechanisms to encourage timely procurement of the resources identified in the report and to advance the objectives of this section.SEC. 5.SEC. 4.Section 454.62 is added to the Public Utilities Code, to read:454.62.(a)For purposes of this section, all of the following definitions apply:
(1)Firm zero-carbon resources has the same meaning as defined in Section 25216.7 of the Public Resources Code.
(2)Load-serving entity has the same meaning as defined in Section 380.
(b)Beginning on or before December 31, 2026, July 1, 2027, pursuant to the process described in Section 454.52, the commission shall evaluate resources necessary to optimize local reliability at least cost, consistent with the goals of Section 454.53.
(c)As part of the evaluation, the commission shall do both of the following:
(1)Ensure ensure that each load-serving entitys integrated resource plan considers all reasonable new resource options that could be deployed to meet local reliability requirements at least cost, including firm zero-carbon resources with the attributes described in Section 380.1.
(2)Ensure that each load-serving entity take reasonable actions to ensure that an appropriate proportion of new resource development occurs in local reliability areas.SEC. 6.SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares all of the following:
(a)Firm zero-carbon resources, which include renewable resources that can, along with other resources, provide nonemitting firm dispatchable capacity, are essential to advancing Californias clean energy goals and ensuring a reliable, resilient, and affordable electricity system, including in the face of growing challenges posed by extended weather events and wildfire risks.
(b)Firm zero-carbon resources are not fully represented or valued in the states energy planning processes or market rules, which may lead to suboptimal energy and cost outcomes.
(c)Several funding programs can be aligned to support the deployment of firm zero-carbon resources and other technologies needed to enhance system and local reliability and meet the states clean energy and affordability goals.
(d)Enabling the widest array of clean energy resources, including firm zero-carbon resources, to participate in the states energy markets as soon as possible will maximize competition and innovation, and deliver the most affordable energy outcomes for California ratepayers.
SEC. 2.Section 25216.2 is added to the Public Resources Code, to read:25216.2.(a)For purposes of this section, all of the following definitions apply:
(1)Firm zero-carbon resources has the same meaning as defined in Section 25216.7.
(2)Long term, midterm, and short term have the same meanings as defined in Section 454.52 of the Public Utilities Code.
(b)On or before July 1, 2026, through a new or ongoing proceeding, the commission shall do all of the following in relation to firm zero-carbon resources:
(1)Identify programs administered by the commission that provide, or could provide, financial support to deploy firm zero-carbon resources, including energy storage, to enhance system and local reliability of Californias electrical grid in the long term, midterm, and short term.
(2)Identify mechanisms to use uncommitted or newly authorized funds in a manner that maximizes system and local reliability benefits and affordability outcomes in the short term and midterm.
(3)Identify the expected scope of energy resources that could be deployed based on current and expected funding availability and the associated attributes in the long term, midterm, and short term, including all of the following:
(A)Total capacity, on a megawatt basis, and for energy storage, on a megawatt and megawatthour basis.
(B)Expected benefits to energy reliability, including local reliability.
(C)Any expected deficiencies, on a megawatt or megawatthour basis, to energy reliability, including local reliability.
(D)Proposed funding needs of currently operating programs to address any expected deficiencies in energy reliability, including local reliability, especially in the midterm and short term.
SEC. 3.Section 380.1 is added to the Public Utilities Code, to read:380.1.(a)For purposes of this section, firm zero-carbon resources has the same meaning as defined in Section 25216.7 of the Public Resources Code.
(b)On or before December 31, 2026, through a new or ongoing proceeding, the commission shall establish or identify a current process by which each load-serving entity, as defined in Section 380, subject to its jurisdiction may solicit bids and propose projects for new firm zero-carbon resources to meet identified local reliability needs.
(c)The process shall be designed to identify and consider approval of projects that achieve all of the following outcomes:
(1)Deploy least cost options for providing local reliability using firm zero-carbon resources.
(2)Enhance grid reliability during electrical grid stress conditions that may persist for multiple days.
(3)Increase resource diversity in the state.
(4)Reduce emissions in low-income and disadvantaged communities.
(5)Support efforts to improve electrical affordability.
SEC. 4.Section 380.6 is added to the Public Utilities Code, to read:380.6.(a)For purposes of this section, all of the following definitions apply:
(1)Firm zero-carbon resources has the same meaning as defined in Section 25216.7 of the Public Resources Code.
(2)Long term, midterm, and short term have the same meanings as defined in Section 454.52.
(b)On or before December 31, 2026, in consultation with the Independent System Operator, the commission shall produce a report identifying opportunities and needs to provide for local reliability with firm zero-carbon resources over the short term, midterm, and long term.
(c)The report produced pursuant to subdivision (b) shall include all of the following:
(1)Characterization of the resource attributes vital for local reliability, and identification of firm zero-carbon resources capable of providing those attributes.
(2)Development of scenarios identifying the scale of firm zero-carbon resource needs to provide local reliability over the short term, midterm, and long term, accounting for economic retirements of available infrastructure and based on reliability needs.
(3)Identification of priority regions for deploying firm zero-carbon resources to provide local reliability over the short term and midterm, based on the scenarios and considerations identified in paragraph (2).
(4)Identification of barriers, including market barriers, to deploying firm zero-carbon resources to enhance local reliability.
(5)Identification of solutions to overcome barriers identified in paragraph (4), including potential changes to market products or new services that may be requiredsuch as multiday firm capacity products, flexible ramping products, or other firm energy supply obligations that could incentivize the long-term development of firm zero-carbon resources needed to meet the states energy goals and achieve the outcomes of this section.
(6)Identification of implementation timelines, regulatory processes, or stakeholder engagement steps required to adopt those changes.
(d)The commission may propose pilot or demonstration market mechanisms to encourage timely procurement of the resources identified in the report and to advance the objectives of this section.
SEC. 5.Section 454.62 is added to the Public Utilities Code, to read:454.62.(a)For purposes of this section, all of the following definitions apply:
(1)Firm zero-carbon resources has the same meaning as defined in Section 25216.7 of the Public Resources Code.
(2)Load-serving entity has the same meaning as defined in Section 380.
(b)Beginning on or before December 31, 2026, pursuant to the process described in Section 454.52, the commission shall evaluate resources necessary to optimize local reliability at least cost, consistent with the goals of Section 454.53.
(c)As part of the evaluation, the commission shall do both of the following:
(1)Ensure that each load-serving entitys integrated resource plan considers all reasonable new resource options that could be deployed to meet local reliability requirements at least cost, including firm zero-carbon resources with the attributes described in Section 380.1.
(2)Ensure that each load-serving entity take reasonable actions to ensure that an appropriate proportion of new resource development occurs in local reliability areas.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.It is the intent of the legislature to enact future legislation to support the deployment of firm zero-carbon energy resources in order to enhance local reliability, improve grid resilience, and reduce ongoing ratepayer costs.It is the intent of the legislature to enact future legislation to support the deployment of firm zero-carbon energy resources in order to enhance local reliability, improve grid resilience, and reduce ongoing ratepayer costs.
|
Date
|
Status
|
|---|---|
| Aug 29, 2025 | August 29 hearing: Held in committee and under submission. |
| Aug 20, 2025 | August 20 set for first hearing. Placed on APPR. suspense file. |
| Jul 10, 2025 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To consent calendar. (Ayes 18. Noes 0.) (July 9). Re-referred to Com. on APPR. |
| Jun 27, 2025 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on U. & E. |
| Jun 16, 2025 | Referred to Com. on U. & E. |
| Jun 5, 2025 | In Assembly. Read first time. Held at Desk. |
| Jun 4, 2025 | Read third time. Passed. (Ayes 29. Noes 10. Page 1520.) Ordered to the Assembly. |
| May 27, 2025 | Read second time. Ordered to third reading. |
| May 23, 2025 | Read second time and amended. Ordered to second reading. |
| May 23, 2025 | From committee: Do pass as amended. (Ayes 5. Noes 1. Page 1215.) (May 23). |
| May 20, 2025 | Set for hearing May 23. |
| May 19, 2025 | May 19 hearing: Placed on APPR. suspense file. |
| May 9, 2025 | Set for hearing May 19. |
| May 1, 2025 | Read second time and amended. Re-referred to Com. on APPR. |
| Apr 30, 2025 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 13. Noes 3. Page 936.) (April 29). |
| Apr 11, 2025 | Set for hearing April 29. |
| Apr 2, 2025 | Re-referred to Com. on E., U & C. |
| Mar 26, 2025 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Mar 12, 2025 | Referred to Com. on RLS. |
| Feb 24, 2025 | Read first time. |
| Feb 24, 2025 | From printer. May be acted upon on or after March 24. |
| Feb 21, 2025 | Introduced. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Jul 9, 2025 | Do pass and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar | Assembly Standing Committee on Utilities and Energy |
Passed |
|
| Jun 4, 2025 | Senate 3rd Reading SB842 Stern | Senate Floor |
Passed |
|
| May 23, 2025 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| May 19, 2025 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 29, 2025 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Advanced Energy United | ** Support | |
| Clean Power Campaign | ** Support | |
| Form Energy | ** Support | |
| Pacific Gas and Electric | ** Support | |
| Southern California Edison | ** Against | |
| Terrament, Inc. | ** Support | |
| Union Of Concerned Scientists | ** Support |
Date of Hearing: August 20, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 842
Author:(Stern) – As Amended Ver:June 27, 2025
Policy Committee: | Utilities and Energy | Vote: | 18 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill requires the California Public Utilities Commission (CPUC), in consultation with the California Independent System Operator (CAISO), by December 31, 2026, to produce a report identifying the opportunities and needs to provide for local and system reliability through firm zero-carbon resources over the short term, midterm, and long term.
FISCAL EFFECT:
This bill will entail complex analytical work of the CPUC, as well as associated administrative work. Costs to the CPUC will likely be in the low- to mid-hundreds of thousands of dollars (Public Utilities Commission Utilities Reimbursement Account) and should be limited to the time it takes the CPUC to produce the one-time report.
The CPUC estimates these costs at $653,000 annually, which covers the cost of two regulatory analysts, at an average annual cost of approximately $201,000 each, as well as $250,000 for each of two years for a contract with an outside consultant to develop and run modeling scenarios that identify the scale of firm zero-carbon resource needs to provide local reliability, and to develop a local analysis tool to identify priority regions for deploying firm zero-carbon resources.
COMMENTS:
Firm power generally refers to power that can be supplied reliably, when needed, and for long duration. Typically, California’s firm power has been supplied by powerplants that generate electricity through the use of heat produced by burning natural gas or another fossil fuel or by nuclear reaction, though firm power can also be supplied by certain renewable resources, such as geothermal power. Firm power can be contrasted with intermittent power, which is supplied irregularly and less reliably, for example, when the sun shines or when the wind blows.
Statute requires the CPUC, in coordination with CAISO, to adopt resource adequacy (RA) requirements. In simple terms, RA is a standard meant to ensure electricity providers subject to the CPUC’s jurisdiction—known as load-serving entities (LSEs), which, in the context of CPUC jurisdiction means the investor-owned utilities (IOUs), community choice aggregators and electric service providers—have sufficient supplies of electricity available, if needed, to meet customer demand. Currently, the CPUC requires the LSEs to plan for three types of RA: system RA—RA sufficient to accommodate peak system-wide demand, including a reserve margin; local RA—RA sufficient to accommodate peak demand in local areas, even when the local area supply of electricity is stressed by rare events; and flexible RA—RA sufficient to accommodate the largest three-hour ramp for each month needed to run the electrical system reliably.
The author sees California’s electricity system as increasingly challenged by wildfire, load growth and affordability and intends this bill to support accommodation of “a wide and diverse array of clean energy resources” and “optimized planning and help to reduce ratepayer costs.”
This bill is supported by Pacific Gas and Electric and the Clean Power Campaign, the latter of which asserts “California’s grid currently lacks a structured approach to plan for retirement of aging natural gas power plants and deploy the firm zero-carbon resources that are likely needed to replace them,” and views this bill as ensuring “state agencies are optimally planning for all energy needs and constraints, including local reliability.”
There is no opposition registered against this bill.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: July 9, 2025
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
SBPCA Bill Id:SB 842
Author:(Stern) – As Amended Ver:June 27, 2025
SENATE VOTE: 29-10
SUBJECT: Energy: firm zero-carbon resources
SUMMARY: Requires the California Public Utilities Commission (CPUC), by December 31, 2026, to produce a report identifying the opportunities and needs to provide for local and system reliability through firm zero-carbon resources over the short term, midterm, and long term as specified. Specifically, this bill:
- Requires the report to include, among other things, characterization of the resource attributes vital for local and system reliability and identification of barriers, including market barriers, to deploying firm zero-carbon resources to enhance local and system reliability.
EXISTING LAW:
- Establishes the California Public Utilities Commission (CPUC) with regulatory authority over all public utilities, including electrical and gas corporations. (Article XII of the California Constitution)
- Establishes the 100 Percent Clean Energy Act of 2018 as a policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045. (Public Utilities Code § 454.53)
- Requires the California Energy Commission (CEC) to conduct assessments and forecasts of all aspects of energy industry supply, production, transportation, delivery and distribution, demand, and prices and to use these assessments and forecasts to develop and evaluate energy policies and programs that conserve resources, protect the environment, ensure energy reliability, enhance the state's economy, and protect public health and safety. (Public Resources Code § 25301(a))
- Establishes the California Independent System Operator (CAISO) as a nonprofit public benefit corporation, and requires the CAISO to ensure the efficient use and reliable operation of the electrical transmission grid consistent with the achievement of planning and operating reserve criteria. (Public Utilities Code § 345.5)
- Requires the CPUC and CEC, in consultation with the California Air Resources Board (CARB), to take steps to ensure that a transition to a zero-carbon electric system for the State of California does not cause or contribute to greenhouse gas (GHG) emissions increases elsewhere in the western grid. Requires the CPUC, CEC, and CARB, and all other state agencies to incorporate that policy into all relevant planning. Requires the CPUC, CEC, and CARB to use programs authorized under existing statutes to achieve that policy. (Public Utilities Code § 454.53)
- Requires the CPUC, in consultation with the CAISO, to establish resource adequacy (RA) requirements for all load-serving entities (LSEs), including electrical corporations, electric service providers (ESPs), and community choice aggregators (CCAs), in accordance with specified objectives. (Public Utilities Code § 380)
- Requires the CPUC to adopt a process for each of those LSEs to file an integrated resource plan (IRP) and a schedule for periodic updates to the plan to ensure that it meets, among other things, the state’s targets for reducing emissions of GHGs and the requirement to procure at least 60% of its electricity from eligible renewable energy resources by December 31, 2030. (Public Utilities Code § 454.52)
- Requires that the IRP contribute to a diverse and balanced portfolio of resources needed to ensure a reliable supply of electricity that provides optimal integration of renewable energy resources in a cost-effective manner and prevents cost shifting among LSEs. (Public Utilities Code § 454.54)
- Requires the CEC, in consultation with the CPUC, CAISO, and CARB, on or before December 31, 2023, to submit to the Legislature an assessment of the firm zero-carbon resources that support a clean, reliable, and resilient electrical grid in California and will achieve the policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of all retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045, as specified. (Public Resources Code § 25216.7)
FISCAL EFFECT:
According to the Senate Committee on Appropriations, the CPUC may incur unknown but potentially significant ongoing costs—funded by ratepayers—to implement the provisions of this bill. The CEC anticipates any associated costs would be minor and absorbable.
CUSTOMER COST IMPACTS: Unknown.
BACKGROUND:
“Firm power” – Generally, “firm power” refers to electricity resources that can deliver electricity at any time, for as long as needed.[1] These resources may include anything from fossil fuel plants (coal, biomass, natural gas, etc.) to nuclear energy to geothermal or hydropower. Much of the firm power currently in use in California is from natural gas.[2] As California transitions to a decarbonized grid, studies highlight the growing need for clean firm power to maintain reliability California is not adequately preparing these resources for future procurement. Without adequately planning for these resources, the state may fall short for the timely procurement of these resources. As such, the Legislature adopted SB 423 (Stern, Chapter 243, Statutes of 2021) which requires the CEC in consultation with CPUC, CAISO, and CARB to submit by December 31, 2023, an assessment of firm zero-carbon resources that support a clean, reliable, and resilient electrical grid. This legislation provided a statutory definition of “firm zero-carbon resources” as electrical resources that can individually, or in combination, deliver zero-carbon electricity with high availability for the expected duration of multiday extreme or atypical weather events, including periods of low renewable energy generation, and facilitate integration of eligible renewable energy resources into the electrical grid and the transition to a zero-carbon electrical grid. This definition could apply to a variety of generation and storage technologies, both known and nascent, from geothermal to green electrolytic hydrogen to long-duration storage.
Planning for the Future: the IRP, SB 100, IEPR, and RA – California has a complicated but robust electric planning and procurement regime spread across the CPUC, CEC, and CAISO. This regime guides the current procurement the LSEs conduct, and informs mid- and long-term procurement strategies. The regime is complementary, where one resource may count toward meeting many facets of an LSE’s procurement requirements and planning goals. The main pieces of the regime are the IRP, the related SB 100 Report, the IEPR, and RA.
Recent Integrated Resource Planning (IRP) framework – To achieve procurement targets for SB 100, the CPUC, adopted an Integrated Resource Plan (IRP)[3] planning process that runs on a two-year cycle. In February 2024, the CPUC adopted a decision in its integrated resource planning that meets a statewide 25 million metric ton (MMT) greenhouse gas (GHG) target for the electric sector by 2035.[4]The decision represents the most aggressive target identified by CARB, which identifies that 56,000 megawatts of clean new resources are needed by 2035. The CPUC also recommended to the California Independent System Operator (CAISO) that the resource portfolio achieving the 25 MMT GHG goal be the foundation for planning transmission investments – utilized as both the reliability base case and the policy-driven base case for study in its 2024-2025 Transmission Planning Process (TPP).
SB 100 Report – While the IRP focuses on what energy mix is best suited to meet our GHG and reliability goals 10 years into the future, the Joint Agency SB 100 Report looks at a planning horizon 24 years out, to determine how best to implement the 100%-clean-electricity-by-2045 policy enacted under SB 100 (De León, Chapter 312, Statutes of 2018).[5] The first SB 100 report was finalized in March 2021, and included analyses of many pathways to achieve the state’s 2045 clean energy goal, including a core scenario which selected offshore wind resources and long-duration storage, as well as study scenarios examining “zero-carbon firm resources.”[6] The SB 100 Report will be updated every four years, with future work focused on system reliability,[7] among other considerations.
The Integrated Energy Policy Report (IEPR) – Alongside the IRP and SB 100 Report, which focus on potential mid- and long-term procurement needs for the electricity system, the CEC conducts an IEPR to forecast all aspects of energy industry supply, production, transportation, delivery, distribution, demand, and pricing. The CEC is then required to use these assessments and forecasts to develop energy policies that conserve resources, protect the environment, ensure energy reliability, enhance the state's economy, and protect public health and safety. The CEC adopts an IEPR every two years with updates every other year. The information generated from the IEPR’s demand forecast informs the IRP and RA processes at the CPUC.
Resource Adequacy (RA) – Running concurrently, the RA process, overseen by the CPUC and CAISO, is designed to identify resources needed to ensure reliability. Following the California energy crisis of 2000-01, the California Legislature enacted AB 380 (Nunez, Chapter 367, Statutes of 2005) to prevent future incidents of widespread blackouts and rolling brownouts due to lack of electricity. This statute established the RA program to guide resource procurement and promote infrastructure investment by requiring that Load Serving Entities (LSEs) procure capacity so that capacity is available to the CAISO when and where needed. The program lives at the CPUC, which must work in consultation with the CAISO to establish RA requirements for all LSEs.
The current RA program consists of system, local, and flexible requirements for each month of a compliance year. System requirements are determined for each LSE based on the CEC’s integrated energy policy report (IEPR) electricity forecast plus a 17% planning reserve margin (PRM) for 2024-25.[8] Due to higher energy demand in hotter months, the effective PRM increases to between 20-22.5% for the three large investor-owned utilities (IOUs) in the summers of 2024 and 2025.[9] Local requirements are determined based on an annual CAISO study using a 1-in-10 LOLE and an N-1-1 contingency.[10] Flexible requirements are based on an annual CAISO study that currently looks at the largest three-hour ramp for each month needed to run the system reliably. In October, LSEs must demonstrate that they have procured 90% of their system RA obligations for the five summer months (May-September) of the following year, as well as 100% of their local requirements, and 90% of their flexible requirements for each month of the coming compliance year. There is an additional monthly reporting requirement for RA, where LSEs must demonstrate they have procured 100% of their monthly system and flexible RA obligation.
The RA market has experienced significant constraint recently, largely driven by resource retirements across the western U.S. and the growing frequency of. For example, in 2020, two extreme heatwaves impacted the western United States and strained electric system operations in California.[11] One of the heatwaves resulted in two days (August 14-15) of rotating outages in the CAISO territory from 6-9 p.m. These outages marked the first time in nearly 20 years that such rotating outages occurred in California.[12] This event led to extensive effort and collaboration amongst California’s energy agencies to understand the root cause of the event and to develop strategies, which are promulgated in a Final Root Cause Analysis to ensure such events do not recur, including making changes to the RA program.
COMMENTS:
- Author statement. According to the author, “California is a clean energy leader, yet its electricity system faces increasing challenges from wildfire, load growth and affordability challenges. It is more critical than ever to ensure that our energy planning is optimized for the array of reliability, affordability, and energy constraints the system faces, and accommodates a wide and diverse array of clean energy resources to optimize outcomes for ratepayers. SB 842 will support this optimized planning and help to reduce ratepayer costs.”
- This Bill. This measure requires the CPUC in consultation with CAISO, to produce a report identifying how firm zero-carbon resources can support local and system reliability across the short, mid, and long term. The report must also examine market and regulatory barriers to deployment and propose strategies to address these barriers. Supporters of the legislation argue that firm zero-carbon resources are essential to achieving the state’s reliability and climate goals. However, they contend that current planning efforts do not adequately account for the optimal benefits of these resources or address the dual challenge of ensuring local reliability and meeting the state’s decarbonization goals in a cost-effective manner. To close this gap, SB 842 directs the CPUC to identify key resource attributes, deployment scenarios, priority regions, implementation timelines, and the regulatory or stakeholder processes needed in planning and procurement decisions.
- Prior Legislation.
AB 2368 (Petrie-Norris) modified several aspects of the RA program and IRP process at the CPUC in order to address challenges with electricity supply reliability. Status: Chapter 713, Statutes of 2024.
AB 1373 (Garcia) directed the CPUC to evaluate the need for and authorizes establishing a central procurement entity to support deployment of certain LLT energy resources. Status: Chapter 367, Statutes of 2023.
AB 205 (Committee on Budget) among its many provision, created the Strategic Reliability Reserve Program and Fund and related programs. Status: Chapter 61, Statutes of 2022.
SB 1020 (Laird) established interim targets to reach SB 100 clean energy goals and requires state agencies to purchase 100% zero-carbon electricity by 2035 to serve their load, including obligations on State Water Project. Status: Chapter 361, Statutes of 2022.
SB 887 (Becker) required 15-year projections of energy resource portfolios and energy demand to inform transmission planning to achieve the state’s clean energy goals, and requires the CAISO to consider approval for specified transmission projects as part of the 2022-23 transmission planning process. Status: Chapter 358, Statutes of 2022.
SB 423 (Stern) required the CEC to submit to the Legislature an assessment by December 31, 2023, of firm zero-carbon resources that support a clean, reliable, and resilient electrical grid and will help achieve the existing statutory goal of ensuring renewable energy and zero-carbon resources supply 100% percent of all retail sales of electricity to California customers by December 31, 2045. Status: Chapter 243, Statutes of 2021.
SB 100 (De León) would establishes the 100 Percent Clean Energy Act of 2017 which increases the RPS requirement from 50% by 2030 to 60%, and creates the policy of planning to meet all of the state's retail electricity supply with a mix of RPS-eligible and zero-carbon resources by December 31, 2045, for a total of 100% clean energy. Chapter 312, Statutes of 2018.
REGISTERED SUPPORT / OPPOSITION:
Support
Advanced Energy United
Clean Power Campaign
Form Energy
Pacific Gas and Electric Company
Union of Concerned Scientists
Opposition
None on file.
Analysis Prepared by: Lina V. Malova / U. & E. / (916) 319-2083
Long, JCS, et al., “Clean Firm Power is the Key to California’s Carbon-Free Energy Future,” Issues in Science and Technology, March 24, 2021. ↑
Roughly 42 MW; Long, JCS, et al. “Clean Firm…,” Issues. ↑
IRP provides the umbrella process by which the CPUC oversees long-term procurement for its regulated load-serving entities (electrical corporations, community choice aggregators, and electric service providers), which serve approximately 75% of the state. The intent of this process is to ensure system needs are being met by the sum actions of the many LSEs in that system. The IRP looks a decade or more into the future. ↑
Proposed Decision issued 2/15/2021 in IRP Proceeding, Rulemaking 20-05-003 ↑
CEC, CPUC, & CARB; 2021 SB 100 Joint Agency Report: Achieving 100 Percent Clean Electricity in California: An Initial Assessment;” March 2021. ↑
Pg. 12, 2021 SB 100 Report. ↑
Pg. 1, 2021 SB 100 Report. ↑
The 17% PRM represents an increase relative to the 16% PRM applicable in 2022 and the 15% applicable from 2005-21. CPUC; “Fact Sheet on Decision in Phase 3 of the Implementation Track in the Resource Adequacy (RA) Proceeding (R. 21-10-002); July 2023; https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/resource-adequacy-homepage/fact-sheet-on-ra-d2306029-on-implementation-track-phase-3.pdf ↑
The 20-22.5% effective PRM represents an increase relative to the 15% effective PRM before 2022. ↑
N-1-1 Contingency: A sequence of events consisting of the initial loss of a single generator or transmission component (Primary Contingency), followed by system adjustments, followed by another loss of a single generator, or transmission component (Secondary Contingency). ↑
CBS News; “Another record-breaking heat wave is building in the West”; September 2020. https://www.cbsnews.com/news/labor-day-weekend-heat-wave-forcast-western-united-states/. ↑
CAISO, CPUC, CEC; “Preliminary Root Cause Analysis: Mid-August 2020 Heat Storm”; October 2020. ↑
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 842 |
THIRD READING
Bill No: SB 842
Author: Stern (D)
Amended: 5/23/25
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 13-3, 4/29/25
AYES: Becker, Allen, Archuleta, Arreguín, Ashby, Caballero, Gonzalez, Hurtado, Limón, McNerney, Rubio, Stern, Wahab
NOES: Ochoa Bogh, Dahle, Strickland
NO VOTE RECORDED: Grove
SENATE APPROPRIATIONS COMMITTEE: 5-1, 5/23/25
AYES: Caballero, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto
NO VOTE RECORDED: Dahle
SUBJECT: Energy: firm zero-carbon resources
SOURCE: Author
DIGEST:
This bill requires the California Public Utilities Commission (CPUC) to produce a report identifying opportunities and needs to provide for local electricity reliability with firm zero-carbon resources.
ANALYSIS:
Existing law:
- Establishes the CPUC with regulatory authority over all public utilities, including electrical and gas corporations. (Article XII of the California Constitution)
- Establishes the 100% Clean Energy Act of 2018 as a policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045. (Public Utilities Code §454.53)
- Requires the CPUC and California Energy Commission (CEC), in consultation with the California Air Resources Board (CARB), to take steps to ensure that a transition to a zero-carbon electric system for the State of California does not cause or contribute to greenhouse gas (GHG) emissions increases elsewhere in the western grid. Requires the CPUC, CEC, and CARB, and all other state agencies to incorporate that policy into all relevant planning. Requires the CPUC, CEC, and CARB to use programs authorized under existing statutes to achieve that policy. (Public Utilities Code (PUC), §454.53)
- Requires the CPUC, in consultation with the CAISO, to establish resource adequacy (RA) requirements for all load-serving entities (LSEs), including electrical corporations, electric service providers (ESPs), and community choice aggregators (CCAs), in accordance with specified objectives. (PUC §380)
- Requires the CEC, in consultation with the CPUC, California Independent System Operator (CAISO), and CARB, on or before December 31, 2023, to submit to the Legislature an assessment of the firm zero-carbon resources that support a clean, reliable, and resilient electrical grid in California and will achieve the policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of all retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045, as specified. (Public Resources Code §25216.7)
This bill:
- Requires the CPUC, on or before December 31, 2026, to produce a report identifying opportunities and needs to provide for local reliability with firm zero-carbon resources over the short term, midterm, and long term, as provided.
- Requires the report to include, among other things, characterization of the resource attributes vital for local reliability and identification of barriers, including market barriers, to deploying firm zero-carbon resources to enhance local reliability.
Background
Firm zero-carbon resources. “Firm energy resources” (also referred to as “firm power”) refers to electricity-generating resources that can deliver electricity at any time, even under adverse conditions. California’s electric grid currently relies on fossil fuels (natural gas), to meet its reliability needs. As California moves towards a decarbonized electric grid and away from fossil fuels, other sources of firm power are necessary. Solar and wind have become mature technologies and enjoy substantial public support. However, these resources present challenges because they depend on the weather, which varies in predictable and unpredictable ways, and results in intermittent generation. Although the costs of solar and wind power are now fully competitive with other electricity generating resources per kilowatt-hour, their inescapable variability means other resources are necessary to provide generation when these resources are not able to provide electrons to the grid. This transition has been characterized by widespread adoption of renewable energy complemented by natural gas power plants, which offer operational flexibility and reliability. Firm zero-carbon resources are those that can reliably produce zero-carbon or renewable electricity on demand.
While battery energy storage has been improving, and can help make up for fluctuations that last for multiple hours, they cannot make up for the longer fluctuations. Other firm zero-carbon resources include: geothermal, offshore wind, green electrolytic hydrogen, long-duration energy storage, and multi-day energy storage. Though they differ in capacity, expense, and geographic feasibility, these sources are all carbon-free power sources that can be relied on whenever needed, for as long as they are needed. California today has 48 gigawatts (GW) of total firm power capacity, most of which (42 GW) come from natural gas-fired power plants. The remaining GW come from nuclear power, geothermal, and a small amount from coal.
SB 100/SB 1020 clean energy goals. With the adoption of SB 100 (De León, Chapter 312, Statutes of 2018) and SB 1020 (Laird, Chapter 361, Statutes of 2022), statute established the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90% of all retail sales of electricity to California end-use customers by December 31, 2035, 95% of all retail sales of electricity to California end-use customers by December 31, 2040, 100% of all retail sales of electricity to California end-use customers by December 31, 2045, and 100% of electricity procured to serve all state agencies by December 31, 2035. In March 2021, the CEC, CPUC and CARB, released the first joint agency SB 100 report, to determine how best to implement the 100% clean energy policy, and found that in order to meet the state’s energy goals, California will need to roughly triple its current electricity power capacity.
Renewable Portfolio Standard (RPS). California’s ambitious RPS program is jointly implemented and administered by the CPUC and the CEC. The RPS program requires the state’s energy LSEs, including investor-owned Utilities (IOUs), CCAs, ESPs and publicly owned utilities (POUs) to procure 60% of their total electricity retail sales from eligible renewable energy resources by 2030, and a mix of RPS-eligible and zero-carbon resources by December 31, 2045, for a total of 100% clean energy. The RPS requires milestones on the path to 2030, including interim goals of 25% by 2016, 33% by 2020, 44% by 2024, and 52% by 2027. The state is well on its way to achieving its existing RPS targets. Most POUs are on track to meet their 2020 goals and working towards their 2030 goals. The state’s three largest electric utilities generally have met current procurement goals and anticipate exceeding future procurement goals, with each having procured over 40% eligible renewable energy resources.
Resource Adequacy (RA). Following the California energy crisis of 2000-01, the California Legislature enacted legislation to prevent future incidents of widespread black outs and rolling brown outs due to lack of electric generating capacity. Among the reforms was the adoption of Public Utilities Code §380 which directs the CPUC, in consultation with the CAISO, to establish RA requirements for all LSEs, including IOUs, ESPs, and now includes CCAs which did not exist at the time of the crisis. The current RA program consists of system, local, and flexible requirements for each month of a compliance year. In October, LSEs under the jurisdiction of the CPUC must demonstrate that they have procured 90% of their system RA obligations for the five summer months (May-September) of the following year, as well as 100% of their local requirements, and 90% of their flexible requirements for each month of the coming compliance year. The CPUC has recently adopted changes to RA, including increasing the planning reserve margin from 15% to 17.5% and in some cases to 19%.
SB 423 (Stern, Chapter 243, Statutes of 2021). SB 423 required the CEC, in consultation with the CPUC, CAISO, and CARB to submit to the Legislature an assessment of emerging firm zero-carbon resources that support a clean, reliable, and resilient electrical grid in California. The final report defines and provides a qualitative assessment of various firm zero-carbon resources, those that reliably produce zero-carbon or renewable electricity on demand ensuring a consistent and stable power supply for extended periods. The CEC identified eight resources that met the criteria, they are long-duration energy storage (8+ hours), hydropower, geothermal, renewable natural gas, hydrogen, small modular fission reactors, fusion, and carbon capture. Each technology is thoroughly reviewed, encompassing technological overviews, manufacturing and supply chain considerations, anticipated improvements, and performance and cost characteristics. The report also explores the fundamental barriers and recommendations for firm zero-carbon resources.
Comments
Author statement:
California is a clean energy leader, yet its electricity system faces increasing challenges from wildfire, load growth and affordability challenges. It is more critical than ever to ensure that our energy planning is optimized for the array of reliability, affordability, and energy constraints the system faces, and accommodates a wide and diverse array of clean energy resources to optimize outcomes for ratepayers. SB 842 will support this optimized planning and help to reduce ratepayer costs.
Local reliability. The author and supporters of this bill are frustrated that the state continues to depend on aging natural gas power plants to meet local reliability needs, particularly in areas with limited transmission capacity. The author and this bill’s supporters seek to advance the state’s efforts towards zero-carbon energy resources by supporting local reliability with firm zero-carbon resources. They contend that there is currently no structured approach to deploying firm zero-carbon resources in local reliability areas.
Recent actions to support deployment of firm zero-carbon resources. The CPUC’s Integrated Resources Planning (IRP) process has directed procurement of some firm zero-carbon resources. For example, the CPUC in its mid-term reliability (MTR) procurement orders, requires for Long Lead Time (LLT) resources of 1 GW of firm zero-carbon resources and 1 GW of long duration storage (8-hour duration or greater) by 2031. Under the CPUC’s centralized procurement orders, the CPUC has extended the deadlines for LLT resources. Specifically, CPUC D.24-02-0474 extended the deadline for LLT procurement to 2031. Additionally, under SB 887 (Becker, Chapter 358, Statutes of 2022), the CAISO is tasked with providing information about transmission constrained resources in local reliability areas.
Report intends to inform efforts to deploy firm zero-carbon resources to address local reliability. This bill requires the CPUC to produce a report by December 31, 2026, detailing the barriers and opportunities over the short-, mid-, and long-term to deploy firm zero-carbon resources to meet local reliability. The report is intended to inform future procurement and policy, but does not, in and of itself, required specified procurement of these resources. In this regard, much of the oppositions’ concerns are relevant to language that is no longer in the bill.
Prior/Related Legislation
AB 2368 (Petrie-Norris, Chapter 713, Statutes of 2024) modified several aspects of the RA program and IRP process at the CPUC in order to address challenges with electricity supply reliability.
AB 1373 (Garcia, Chapter 367, Statutes of 2023) directed the CPUC to evaluate the need for and authorizes establishing a central procurement entity to support deployment of certain LLT energy resources.
AB 205 (Committee on Budget, Chapter 61, Statutes of 2022) among its many provision, created the Strategic Reliability Reserve Program and Fund and related programs.
SB 1020 (Laird, Chapter 361, Statutes of 2022) established interim targets to reach SB 100 clean energy goals and requires state agencies to purchase 100% zero-carbon electricity by 2035 to serve their load, including obligations on State Water Project.
SB 887 (Becker, Chapter 358, Statutes of 2022) required 15-year projections of energy resource portfolios and energy demand to inform transmission planning to achieve the state’s clean energy goals, and requires specified actions to support increased transmission capacity into local capacity areas to deliver renewable energy and zero-carbon resources.
SB 423 (Stern, Chapter 243, Statutes of 2021) required the CEC to submit to the Legislature an assessment by December 31, 2023, of firm zero-carbon resources that support a clean, reliable, and resilient electrical grid and will help achieve the existing statutory goal of ensuring renewable energy and zero-carbon resources supply 100% of all retail sales of electricity to California customers by December 31, 2045.
SB 100 (De León, Chapter 312, Statutes of 2018) would establishes the 100% Clean Energy Act of 2017 which increases the RPS requirement from 50% by 2030 to 60%, and creates the policy of planning to meet all of the state's retail electricity supply with a mix of RPS-eligible and zero-carbon resources by December 31, 2045, for a total of 100% clean energy.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee:
- Unknown but potentially significant ongoing costs (ratepayer funds) for the California Public Utilities Commission (CPUC) to implement the provisions of this bill.
- The California Energy Commission (CEC) anticipates any costs would be minor and absorbable as the proposed activities align with existing agency efforts.
SUPPORT: (Verified 5/23/25)
Clean Power Campaign
Form Energy
Terrament, Inc.
Union of Concerned Scientists
OPPOSITION: (Verified 5/23/25)
Pacific Gas and Electric Company
Southern California Edison
ARGUMENTS IN SUPPORT: Union of Concerns Scientists (UCS) states:
UCS supported SB 100 (2018) which set a 100 percent clean renewable target for California’s electrical grid by 2045, while understanding that meeting that target would require meaningful investment in firm zero-carbon resources to help ensure a resilient electrical grid. …California’s grid currently lacks a structured approach to deploy firm zero-carbon resources; yet further deployment of these resources could better support local reliability. Multiple studies, including the 2021 Joint Agency SB 100 Report and recent work funded by the California Energy Commission, show that incorporating long-duration and multi-day energy storage into the state’s energy planning and grid mix could reduce costs and emissions associated with meeting the state’s clean energy and climate change goals.
ARGUMENTS IN OPPOSITION: Pacific Gas & Electric states:
The bill misses an opportunity to understand more thoroughly the role of firm zero-carbon energy resources in ensuring grid stability and reliability. Specifically, the bill does not address the long-term reliability impacts that could arise from retiring or shutting down existing firm zero-carbon energy resources, as such resources may need to be maintained to ensure grid stability and reliability. Evaluating the potential consequences of retiring these resources… is necessary.
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
5/27/25 14:43:09
**** END ****
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
SB 842 (Stern) - Energy: firm zero-carbon resources
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would require specified actions by the state’s energy agencies to support the deployment of firm zero-carbon resources, in particular to support local capacity.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on May 23, 2025
Fiscal Impact:
- Unknown but potentially significant ongoing costs (ratepayer funds) for the California Public Utilities Commission (CPUC) to implement the provisions of this bill.
- The California Energy Commission (CEC) anticipates any costs would be minor and absorbable as the proposed activities align with existing agency efforts.
Committee Amendments:
Committee amendments would strike some CPUC requirements.
-- END --
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2025 - 2026 Regular Session
SB 842 (Stern) - Energy: firm zero-carbon resources
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would require specified actions by the state’s energy agencies to support the deployment of firm zero-carbon resources, in particular to support local capacity.
Fiscal Impact:
- The California Public Utilities Commission (CPUC) estimates ongoing costs of $653,000 annually (ratepayer funds) to develop the report and resource assessments as well as to run complex modeling scenarios and conduct local reliability analysis.
- The California Energy Commission (CEC) anticipates any costs would be minor and absorbable as the proposed activities align with existing agency efforts.
Background:
Firm zero-carbon resources. “Firm energy resources” (also referred to as “firm power”) refers to electricity-generating resources that can deliver electricity at any time, even under adverse conditions. California’s electric grid currently relies on fossil fuels (natural gas), to meet its reliability needs. As California moves towards a decarbonized electric grid and away from fossil fuels, other sources of firm power are necessary. Solar and wind have become mature technologies and enjoy substantial public support. However, these resources present challenges because they depend on the weather, which varies in predictable and unpredictable ways, and results in intermittent generation. Although the costs of solar and wind power are now fully competitive with other electricity generating resources per kilowatt-hour, their inescapable variability means other resources are necessary to provide generation when these resources are not able to provide electrons to the grid. This transition has been characterized by widespread adoption of renewable energy complemented by natural gas power plants, which offer operational flexibility and reliability. Firm zero-carbon resources are those that can reliably produce zero-carbon or renewable electricity on demand.
While battery energy storage has been improving, and can help make up for fluctuations that last for multiple hours, they cannot make up for the longer fluctuations. Other firm zero-carbon resources include: geothermal, offshore wind, green electrolytic hydrogen, long-duration energy storage, and multi-day energy storage. Though they differ in capacity, expense, and geographic feasibility, these sources are all carbon-free power sources that can be relied on whenever needed, for as long as they are needed. California today has 48 gigawatts (GW) of total firm power capacity, most of which (42 GW) come from natural gas-fired power plants. The remaining GW come from nuclear power, geothermal, and a small amount from coal.
SB 100/SB 1020 clean energy goals. With the adoption of SB 100 (De León, Chapter 312, Statutes of 2018) and SB 1020 (Laird, Chapter 361, Statutes of 2022), statute established the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90% of all retail sales of electricity to California end-use customers by December 31, 2035, 95% of all retail sales of electricity to California end-use customers by December 31, 2040, 100% of all retail sales of electricity to California end-use customers by December 31, 2045, and 100% of electricity procured to serve all state agencies by December 31, 2035.
Resource Adequacy (RA). Following the California energy crisis of 2000-01, the California Legislature enacted legislation to prevent future incidents of widespread black outs and rolling brown outs due to lack of electric generating capacity. Among the reforms was the adoption of Public Utilities Code §380 which directs the CPUC, in consultation with the CAISO, to establish RA requirements for all LSEs, including IOUs, ESPs, and now includes CCAs which did not exist at the time of the crisis. The current RA program consists of system, local, and flexible requirements for each month of a compliance year. In October, LSEs under the jurisdiction of the CPUC must demonstrate that they have procured 90% of their system RA obligations for the five summer months (May-September) of the following year, as well as 100% of their local requirements, and 90% of their flexible requirements for each month of the coming compliance year. The CPUC has recently adopted changes to RA, including increasing the planning reserve margin from 15% to 17.5% and in some cases to 19%.
SB 423 (Stern, Chapter 243, Statutes of 2021). SB 423 required the CEC, in consultation with the CPUC, CAISO, and CARB to submit to the Legislature an assessment of emerging firm zero-carbon resources that support a clean, reliable, and resilient electrical grid in California. The final report defines and provides a qualitative assessment of various firm zero-carbon resources, those that reliably produce zero-carbon or renewable electricity on demand ensuring a consistent and stable power supply for extended periods. The CEC identified eight resources that met the criteria, they are long-duration energy storage (8+ hours), hydropower, geothermal, renewable natural gas, hydrogen, small modular fission reactors, fusion, and carbon capture. Each technology is thoroughly reviewed, encompassing technological overviews, manufacturing and supply chain considerations, anticipated improvements, and performance and cost characteristics. The report also explores the fundamental barriers and recommendations for firm zero-carbon resources.
Proposed Law:
This bill would require specified actions by the state’s energy agencies to support the deployment of firm zero-carbon resources, in particular to support local capacity. In particular, this bill would:
- Require the CEC, on or before July 1, 2026, through a new or ongoing proceeding, to identify programs it administers that provide, or could provide, financial support to deploy firm zero-carbon resources, mechanisms to use uncommitted or newly authorized funds in a manner that maximizes system and local reliability benefits and affordability outcomes, as provided, and the expected scope of energy resources that could be deployed based on current and expected funding availability, as provided.
- Require the CPUC, on or before December 31, 2026, to produce a report identifying opportunities and needs to provide for local reliability with firm zero-carbon resources over the short term, midterm, and long term, as provided.
- Require the CPUC, beginning on or before July 1, 2027, to evaluate resources necessary to optimize local reliability at least cost.
- Require the CPUC, as part of the evaluation, to ensure that each LSE’s IRP considers all reasonable new resource options that could be deployed to meet local reliability requirements at least cost.
- Provide that no reimbursement is required because any costs incurred would be due to the implementation of these provisions being a crime, as specified.
Related Legislation:
AB 2368 (Petrie-Norris, Chapter 713, Statutes of 2024) modified several aspects of the RA program and IRP process at the CPUC in order to address challenges with electricity supply reliability.
AB 1373 (Garcia, Chapter 367, Statutes of 2023) directed the CPUC to evaluate the need for and authorizes establishing a central procurement entity to support deployment of certain LLT energy resources.
AB 205 (Committee on Budget, Chapter 61, Statutes of 2022) among its many provision, created the Strategic Reliability Reserve Program and Fund and related programs.
SB 1020 (Laird, Chapter 361, Statutes of 2022) established interim targets to reach SB 100 clean energy goals and requires state agencies to purchase 100% zero-carbon electricity by 2035 to serve their load, including obligations on State Water Project.
SB 887 (Becker, Chapter 358, Statutes of 2022) required 15-year projections of energy resource portfolios and energy demand to inform transmission planning to achieve the state’s clean energy goals, and requires the CAISO to consider approval for specified transmission projects as part of the 2022-23 transmission planning process.
SB 423 (Stern, Chapter 243, Statutes of 2021) required the CEC to submit to the Legislature an assessment by December 31, 2023, of firm zero-carbon resources that support a clean, reliable, and resilient electrical grid and will help achieve the existing statutory goal of ensuring renewable energy and zero-carbon resources supply 100% percent of all retail sales of electricity to California customers by December 31, 2045.
SB 100 (De León, Chapter 312, Statutes of 2018) would establishes the 100 Percent Clean Energy Act of 2017 which increases the RPS requirement from 50% by 2030 to 60%, and creates the policy of planning to meet all of the state's retail electricity supply with a mix of RPS-eligible and zero-carbon resources by December 31, 2045, for a total of 100% clean energy.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Josh Becker, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 4/29/2025
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill requires specified actions by the state’s energy agencies to support the deployment of firm zero-carbon resources, in particular to support local capacity.
ANALYSIS:
Existing law:
- Establishes the California Public Utilities Commission (CPUC) with regulatory authority over all public utilities, including electrical and gas corporations. (Article XII of the California Constitution)
- Establishes the 100 Percent Clean Energy Act of 2018 as a policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045. (Public Utilities Code §454.53)
- Requires the California Energy Commission (CEC) to conduct assessments and forecasts of all aspects of energy industry supply, production, transportation, delivery and distribution, demand, and prices and to use these assessments and forecasts to develop and evaluate energy policies and programs that conserve resources, protect the environment, ensure energy reliability, enhance the state's economy, and protect public health and safety. (Public Resources Code §25301(a))
- Establishes the California Independent System Operator (CAISO) as a nonprofit public benefit corporation, and requires the CAISO to ensure the efficient use and reliable operation of the electrical transmission grid consistent with the achievement of planning and operating reserve criteria. (Public Utilities Code §345.5)
- Requires the CPUC and CEC, in consultation with the California Air Resources Board (CARB), to take steps to ensure that a transition to a zero-carbon electric system for the State of California does not cause or contribute to greenhouse gas (GHG) emissions increases elsewhere in the western grid. Requires the CPUC, CEC, and CARB, and all other state agencies to incorporate that policy into all relevant planning. Requires the CPUC, CEC, and CARB to use programs authorized under existing statutes to achieve that policy. (Public Utilities Code §454.53)
- Requires the CPUC, in consultation with the CAISO, to establish resource adequacy (RA) requirements for all load-serving entities (LSEs), including electrical corporations, electric service providers (ESPs), and community choice aggregators (CCAs), in accordance with specified objectives. (Public Utilities Code §380)
- Requires the CPUC to adopt a process for each of those LSEs to file an integrated resource plan (IRP) and a schedule for periodic updates to the plan to ensure that it meets, among other things, the state’s targets for reducing emissions of GHGs and the requirement to procure at least 60% of its electricity from eligible renewable energy resources by December 31, 2030. (Public Utilities Code §454.52)
- Requires that the IRP contribute to a diverse and balanced portfolio of resources needed to ensure a reliable supply of electricity that provides optimal integration of renewable energy resources in a cost-effective manner and prevents cost shifting among LSEs. (Public Utilities Code §454.54)
- Requires the CEC, in consultation with the CPUC, CAISO, and CARB, on or before December 31, 2023, to submit to the Legislature an assessment of the firm zero-carbon resources that support a clean, reliable, and resilient electrical grid in California and will achieve the policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of all retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045, as specified. (Public Resources Code §25216.7)
This bill:
- Requires the CEC, on or before July 1, 2026, through a new or ongoing proceeding, to identify programs it administers that provide, or could provide, financial support to deploy firm zero-carbon resources, mechanisms to use uncommitted or new authorized funds in a manner that maximizes system and local reliability benefits and affordability outcomes, as provided, and the expected scope of energy resources that could be deployed based on current and expected funding availability.
- Requires the CPUC, on or before December 31, 2026, through a new or ongoing proceeding, to establish or identify a process by which each LSE subject to its jurisdiction may solicit bids and propose projects for new firm zero-carbon resources to meet identified local reliability needs, as provided.
- Requires the CPUC, on or before December 31, 2026, to produce a report identifying opportunities and needs to provide for local reliability with firm zero-carbon resources over the short term, midterm, and long term, as provided.
- Requires the CPUC, beginning on or before December 31, 2026, to evaluate resources necessary to optimize local reliability at least cost.
- Requires the CPUC, as part of the evaluation, to ensure that each LSE’s IRP considers all reasonable new resource options that could be deployed to meet local reliability requirements at least cost and that each LSE take reasonable actions to ensure that an appropriate proportion of new resource development occurs in local reliability areas.
Background
Firm zero-carbon resources. “Firm energy resources” (also referred to as “firm power”) refers to electricity-generating resources that can deliver electricity at any time, even under adverse conditions. California’s electric grid currently relies on fossil fuels (natural gas), to meet its reliability needs. As California moves towards a decarbonized electric grid and away from fossil fuels, other sources of firm power are necessary. Solar and wind have become mature technologies and enjoy substantial public support. However, these resources present challenges because they depend on the weather, which varies in predictable and unpredictable ways, and results in intermittent generation. Although the costs of solar and wind power are now fully competitive with other electricity generating resources per kilowatt-hour, their inescapable variability means other resources are necessary to provide generation when these resources are not able to provide electrons to the grid. This transition has been characterized by widespread adoption of renewable energy complemented by natural gas power plants, which offer operational flexibility and reliability. Firm zero-carbon resources are those that can reliably produce zero-carbon or renewable electricity on demand.
While battery energy storage has been improving, and can help make up for fluctuations that last for multiple hours, they cannot make up for the longer fluctuations. Other firm zero-carbon resources include: geothermal, offshore wind, green electrolytic hydrogen, long-duration energy storage, and multi-day energy storage. Though they differ in capacity, expense, and geographic feasibility, these sources are all carbon-free power sources that can be relied on whenever needed, for as long as they are needed. California today has 48 gigawatts (GW) of total firm power capacity, most of which (42 GW) come from natural gas-fired power plants. The remaining GW come from nuclear power, geothermal, and a small amount from coal.
SB 100/SB 1020 clean energy goals. With the adoption of SB 100 (De León, Chapter 312, Statutes of 2018) and SB 1020 (Laird, Chapter 361, Statutes of 2022), statute established the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90% of all retail sales of electricity to California end-use customers by December 31, 2035, 95% of all retail sales of electricity to California end-use customers by December 31, 2040, 100% of all retail sales of electricity to California end-use customers by December 31, 2045, and 100% of electricity procured to serve all state agencies by December 31, 2035. In March 2021, the CEC, CPUC and CARB, released the first joint agency SB 100 report, to determine how best to implement the 100% clean energy policy, and found that in order to meet the state’s energy goals, California will need to roughly triple its current electricity power capacity.
Renewable Portfolio Standard (RPS). California’s ambitious RPS program is jointly implemented and administered by the CPUC and the CEC. The RPS program requires the state’s energy LSEs, including investor-owned Utilities (IOUs), CCAs, ESPs and publicly owned utilities (POUs) to procure 60% of their total electricity retail sales from eligible renewable energy resources by 2030, and a mix of RPS-eligible and zero-carbon resources by December 31, 2045, for a total of 100% clean energy. The RPS requires milestones on the path to 2030, including interim goals of 25% by 2016, 33% by 2020, 44% by 2024, and 52% by 2027. The state is well on its way to achieving its existing RPS targets. Most POUs are on track to meet their 2020 goals and working towards their 2030 goals. The state’s three largest electric utilities generally have met current procurement goals and anticipate exceeding future procurement goals, with each having procured over 40% eligible renewable energy resources.
Integrated Resources Plan (IRP). As required in SB 350 (De León, Chapter 547, Statutes of 2015), the IRP process requires the CPUC to identify a portfolio of resources for electricity procurement that provides optimal integration of renewable energy in a cost-effective manner, and minimize impacts on ratepayer’s bills. The identification of this portfolio is intended to guide LSEs’ IRPs, which help ensure that utilities meet GHG reduction targets for the electricity sector. The reference system plan is a guide – not a mandate. As part of the IRP planning cycle, the CPUC adopts a reference system plan, which identifies the energy procurements needed to help the LSEs meet specific GHG reduction goals. In its most recent IRP, the CPUC adopted a GHG reduction goal of 25 million metric tons (MMT) by 2035 (CPUC Decision D. 24-02-047).
Resource Adequacy (RA). Following the California energy crisis of 2000-01, the California Legislature enacted legislation to prevent future incidents of widespread black outs and rolling brown outs due to lack of electric generating capacity. Among the reforms was the adoption of Public Utilities Code §380 which directs the CPUC, in consultation with the CAISO, to establish RA requirements for all LSEs, including IOUs, ESPs, and now includes CCAs which did not exist at the time of the crisis. The current RA program consists of system, local, and flexible requirements for each month of a compliance year. In October, LSEs under the jurisdiction of the CPUC must demonstrate that they have procured 90% of their system RA obligations for the five summer months (May-September) of the following year, as well as 100% of their local requirements, and 90% of their flexible requirements for each month of the coming compliance year. The CPUC has recently adopted changes to RA, including increasing the planning reserve margin from 15% to 17.5% and in some cases to 19%.
Integrated Energy Policy Report (IEPR). The IEPR provides a cohesive approach to identifying and solving the state’s pressing energy needs and issues. The report, which is crafted in collaboration with a range of stakeholders, develops and implements energy plans and policies. SB 1389 (Bowen and Sher, Chapter 568, Statutes of 2002) required the CEC to conduct assessments and forecasts of all aspects of energy industry supply, production, transportation, delivery and distribution, demand, and prices. The CEC is then required to use these assessments and forecasts to develop energy policies that conserve resources, protect the environment, ensure energy reliability, enhance the state's economy, and protect public health and safety.” The CEC adopts an IEPR every two years and an update every other year.
SB 423 (Stern, Chapter 243, Statutes of 2021). SB 423 required the CEC, in consultation with the CPUC, CAISO, and CARB to submit to the Legislature an assessment of emerging firm zero-carbon resources that support a clean, reliable, and resilient electrical grid in California. The final report defines and provides a qualitative assessment of various firm zero-carbon resources, those that reliably produce zero-carbon or renewable electricity on demand ensuring a consistent and stable power supply for extended periods. The CEC identified eight resources that met the criteria, they are long-duration energy storage (8+ hours), hydropower, geothermal, renewable natural gas, hydrogen, small modular fission reactors, fusion, and carbon capture. Each technology is thoroughly reviewed, encompassing technological overviews, manufacturing and supply chain considerations, anticipated improvements, and performance and cost characteristics. The report also explores the fundamental barriers and recommendations for firm zero-carbon resources.
Comments
Author statement:
California is a clean energy leader, yet its electricity system faces increasing challenges from wildfire, load growth and affordability challenges. It is more critical than ever to ensure that our energy planning is optimized for the array of reliability, affordability, and energy constraints the system faces, and accommodates a wide and diverse array of clean energy resources to optimize outcomes for ratepayers. SB 842 will support this optimized planning and help to reduce ratepayer costs.
Local reliability. The author contends that the state continues to depend on aging natural gas power plants to meet local reliability needs, particularly in areas with limited transmission capacity. The author and this bill’s supporters seek to advance the state’s efforts towards zero-carbon energy resources by supporting local reliability with firm zero-carbon resources. They contend that there is currently no structured approach to deploying firm zero-carbon resources in local reliability areas.
Procurement adjacent? The opponents raise concerns that this bill would circumvent existing procurement of the processes, including the CPUC’s IRP process. They argue that the CPUC is already directing procurement of these and other resources. For example, the CPUC in its mid-term reliability (MTR) procurement orders, requires for Long Lead Time (LLT) resources of 1 GW of firm zero-carbon resources and 1 GW of long duration storage (8-hour duration or greater) by 2031. Under the CPUC’s centralized procurement orders, the CPUC has extended the deadlines for LLT resources. Specifically, CPUC D.24-02-0474 extended the deadline for LLT procurement to 2031. Additionally, under SB 887 (Becker, Chapter 358, Statutes of 2022), the CAISO is tasked with providing information about transmission constrained resources in local reliability areas.
- 1 GW NQC Long Duration Storage (8+ hour duration)
- 1 GW NQC Clean Firm (>80% capacity factor)
Need for amendments. The opposition is rightfully concerned about the potential risks due to circumventing the CPUC’s robust procurement processes where the principles of “least-cost, best fit” principles are applied. In order to address the oppositions concerns about this bill encouraging procurement mandates and potentially unaffordable costs to customers, the author and committee may wish to amend this bill to:
- Delete section 3 of the bill.
- Add references of “system reliability” to the required report in section 2.
- Delete the CPUC authorization to deploy a pilot program in Section 4.
- Move the date to July 1, 2027 by when the CPUC must evaluate resources in Section 5.
- Delete the requirement on LSEs that new resource development must occur in local reliability areas.
Prior/Related Legislation
AB 2368 (Petrie-Norris, Chapter 713, Statutes of 2024) modified several aspects of the RA program and IRP process at the CPUC in order to address challenges with electricity supply reliability.
AB 1373 (Garcia, Chapter 367, Statutes of 2023) directed the CPUC to evaluate the need for and authorizes establishing a central procurement entity to support deployment of certain LLT energy resources.
AB 205 (Committee on Budget, Chapter 61, Statutes of 2022) among its many provision, created the Strategic Reliability Reserve Program and Fund and related programs.
SB 1020 (Laird, Chapter 361, Statutes of 2022) established interim targets to reach SB 100 clean energy goals and requires state agencies to purchase 100% zero-carbon electricity by 2035 to serve their load, including obligations on State Water Project.
SB 887 (Becker, Chapter 358, Statutes of 2022) required 15-year projections of energy resource portfolios and energy demand to inform transmission planning to achieve the state’s clean energy goals, and requires the CAISO to consider approval for specified transmission projects as part of the 2022-23 transmission planning process.
SB 423 (Stern, Chapter 243, Statutes of 2021) required the CEC to submit to the Legislature an assessment by December 31, 2023, of firm zero-carbon resources that support a clean, reliable, and resilient electrical grid and will help achieve the existing statutory goal of ensuring renewable energy and zero-carbon resources supply 100% percent of all retail sales of electricity to California customers by December 31, 2045.
SB 100 (De León, Chapter 312, Statutes of 2018) would establishes the 100 Percent Clean Energy Act of 2017 which increases the RPS requirement from 50% by 2030 to 60%, and creates the policy of planning to meet all of the state's retail electricity supply with a mix of RPS-eligible and zero-carbon resources by December 31, 2045, for a total of 100% clean energy.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
Clean Power Campaign
Form Energy
Terrament, Inc.
Union of Concerned Scientists
OPPOSITION:
Southern California Edison
Pacific Gas and Electric Company, unless amended
ARGUMENTS IN SUPPORT: The Union of Concerns Scientists:
UCS supported SB 100 (2018) which set a 100 percent clean renewable target for California’s electrical grid by 2045, while understanding that meeting that target would require meaningful investment in firm zero-carbon resources to help ensure a resilient electrical grid.
California’s grid currently lacks a structured approach to deploy firm zero-carbon resources; yet further deployment of these resources could better support local reliability. Multiple studies, including the 2021 Joint Agency SB 100 Report and recent work funded by the California Energy Commission, show that incorporating long-duration and multi-day energy storage into the state’s energy planning and grid mix could reduce costs and emissions associated with meeting the state’s clean energy and climate change goals. …Under the provisions of SB 842, the CEC and PUC will take a proactive role in identifying and assessing existing and potential funding mechanisms to accelerate the deployment of reliability-enhancing resources, while maintaining affordability. The bill also ensures that load-serving entities evaluate all reasonable options to optimize local reliability at the lowest possible cost, supporting greater energy equity and system-wide resilience across the state.
ARGUMENTS IN OPPOSITION: Southern California Edison states:
SB 842 creates a technology carveout for firm resources, bypassing the CPUC’s collaborative planning process and increasing customers costs. …California’s electric grid needs should be planned in a thoughtful, comprehensive manner so that the right resources are developed with the appropriate operating characteristics, in the correct locations and with enough lead time to ensure they are available to operate when needed. However, achieving these outcomes will fail if technology carveouts tie the hands of LSEs and increase costs for customers when more cost-effective alternatives are available.