SB 878: Insurance business practices.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2026-09-04
Current Status:
In Progress
(2026-09-27: In Senate. Consideration of Governor's veto pending.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law creates the Department of Insurance, headed by the Insurance Commissioner, and generally regulates classes of insurance, including fire and residential property insurance. Existing regulations prescribe specified deadlines by which an insurer is required to, among other things, respond to a notice of claim, accept or deny a claim, in whole or in part, and, upon acceptance of a claim in whole or in part, tender payment or otherwise take action to perform its obligation, as specified.
This bill, with respect to a claim under a policy of residential property insurance, would codify specified provisions of the regulations prescribing the deadlines above.
Existing law specifies the measure of indemnity under an open fire insurance policy that requires payment of actual cash value or replacement cost. Under existing law, the measure of the actual cash value recovery is the amount it would cost the insured to repair, rebuild, or replace the thing lost or injured less a fair and reasonable deduction for physical depreciation based upon its condition at the time of the injury or the policy limit, whichever is less. If an open policy requires the insured to repair, rebuild, or replace the damaged property to collect the full replacement cost, under existing law the insurer is required to pay the actual cash value of the damaged property until the damaged property is repaired, rebuilt, or replaced, at which time the insurer is required to pay the difference between the actual cash value payment made and the full replacement cost reasonably paid to replace the damaged property.
If there is a total loss to the insured structure, this bill would require, except under specified circumstances, an insurer to pay the actual cash value associated with the primary structure and other insured structures within 30 calendar days from the date the property is determined to be a total loss. After this payment is made, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, the bill would require an insurer to pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of a specified event.
This bill would require interest to accrue if payments are not made within 30 calendar days, as specified.
This bill would incorporate additional changes to Section 2051.5 of the Insurance Code proposed by SB 876 to be operative only if this bill and SB 876 are enacted and this bill is enacted last.
Existing law creates the Department of Insurance, headed by the Insurance Commissioner, and generally regulates classes of insurance, including fire and residential property insurance. Existing regulations prescribe specified deadlines by which an insurer is required to, among other things, respond to a notice of claim, accept or deny a claim, in whole or in part, and, upon acceptance of a claim in whole or in part, tender payment or otherwise take action to perform its obligation, as specified.
This bill, with respect to a claim under a policy of residential property insurance, would codify specified provisions of the regulations prescribing the deadlines above.
Existing law specifies the measure of indemnity under an open fire insurance policy that requires payment of actual cash value or replacement cost. Under existing law, the measure of the actual cash value recovery is the amount it would cost the insured to repair, rebuild, or replace the thing lost or injured less a fair and reasonable deduction for physical depreciation based upon its condition at the time of the injury or the policy limit, whichever is less. If an open policy requires the insured to repair, rebuild, or replace the damaged property to collect the full replacement cost, under existing law the insurer is required to pay the actual cash value of the damaged property until the damaged property is repaired, rebuilt, or replaced, at which time the insurer is required to pay the difference between the actual cash value payment made and the full replacement cost reasonably paid to replace the damaged property.
If there is a total loss to the insured structure, this bill would require, except under specified circumstances, an insurer to pay the actual cash value associated with the primary structure and other insured structures within 30 calendar days from the date the property is determined to be a total loss. After this payment is made, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, the bill would require an insurer to pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of a specified event.
This bill would require interest to accrue if payments are not made within 30 calendar days, as specified.
This bill would incorporate additional changes to Section 2051.5 of the Insurance Code proposed by SB 876 to be operative only if this bill and SB 876 are enacted and this bill is enacted last.
Existing law creates the Department of Insurance, headed by the Insurance Commissioner, and generally regulates classes of insurance, including fire and residential property insurance. Existing regulations prescribe specified deadlines by which an insurer is required to, among other things, respond to a notice of claim, accept or deny a claim, in whole or in part, and, upon acceptance of a claim in whole or in part, tender payment or otherwise take action to perform its obligation, as specified.
This bill, with respect to fire insurance claims, a claim under a policy of residential property insurance, would codify specified provisions of the regulations prescribing the deadlines above.
Existing law specifies the measure of indemnity under an open fire insurance policy that requires payment of actual cash value or replacement cost. Under existing law, the measure of the actual cash value recovery is the amount it would cost the insured to repair, rebuild, or replace the thing lost or injured less a fair and reasonable deduction for physical depreciation based upon its condition at the time of the injury or the policy limit, whichever is less. If an open policy requires the insured to repair, rebuild, or replace the damaged property to collect the full replacement cost, under existing law the insurer is required to pay the actual cash value of the damaged property until the damaged property is repaired, rebuilt, or replaced, at which time the insurer is required to pay the difference between the actual cash value payment made and the full replacement cost reasonably paid to replace the damaged property.
If there is a total loss to the insured structure, this bill would require require, except under specified circumstances, an insurer to pay the actual cash value associated with the primary structure and other insured structures within 30 calendar days from the date of the property is determined to be a total loss. After this payment is made, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, the bill would require an insurer to pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of a specified event.
This bill would require interest to accrue if payments are not made within 30 calendar days, as specified.
Existing law creates the Department of Insurance, headed by the Insurance Commissioner, and generally regulates the business of insurance in the state. classes of insurance, including fire and residential property insurance. Existing regulations prescribe specified deadlines by which an insurer is required to, among other things, respond to a notice of claim, accept or deny a claim, in whole or in part, and, upon acceptance of a claim in whole or in part, tender payment or otherwise take action to perform its obligation, as specified.
This bill, with respect to fire insurance claims arising after January 1, 2027, claims, would codify specified provisions of the regulations prescribing the deadlines above. The bill would also make an insurer that does not comply with the deadlines liable to the insured for interest on the amount of the accepted claim, in whole or in part, at the rate of 20% per year, together with reasonable and necessary attorneys fees, in addition to the amount the insured is entitled to under the policy.
This bill would require, by January 2028, and quarterly thereafter, an insurer that offers or sells fire insurance in this state to provide a prompt-payment compliance data report in accordance with the above-described provisions to the department, as provided. The bill would require a corporate officer of the insurer to sign the report and would subject a corporate officer who knowingly provides false information in the report to an administrative penalty, as specified. Commencing July 1, 2028, the bill would require the department to compile the information and publish a quarterly report on its internet website that details each insurers prompt-payment compliance data, as specified.Existing law specifies the measure of indemnity under an open fire insurance policy that requires payment of actual cash value or replacement cost. Under existing law, the measure of the actual cash value recovery is the amount it would cost the insured to repair, rebuild, or replace the thing lost or injured less a fair and reasonable deduction for physical depreciation based upon its condition at the time of the injury or the policy limit, whichever is less. If an open policy requires the insured to repair, rebuild, or replace the damaged property to collect the full replacement cost, under existing law the insurer is required to pay the actual cash value of the damaged property until the damaged property is repaired, rebuilt, or replaced, at which time the insurer is required to pay the difference between the actual cash value payment made and the full replacement cost reasonably paid to replace the damaged property.
If there is a total loss to the insured structure, this bill would require an insurer to pay the actual cash value associated with the primary structure and other insured structures within 30 calendar days from the date of loss. After this payment is made, the bill would require an insurer to pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of a specified event.
This bill would require interest to accrue if payments are not made within 30 calendar days, as specified.
Existing law creates the Department of Insurance, headed by the Insurance Commissioner, and generally regulates the business of insurance in the state. Existing regulations prescribe specified deadlines by which an insurer is required to, among other things, respond to a notice of claim, accept or deny a claim, in whole or in part, and, upon acceptance of a claim in whole or in part, tender payment or otherwise take action to perform its obligation, as specified.
This bill, with respect to fire insurance claims arising after January 1, 2027, would codify specified provisions of the regulations prescribing the deadlines above. The bill would also make an insurer that does not comply with the deadlines liable to the insured for interest on the amount of the accepted claim, in whole or in part, at the rate of 20% per year as damages, year, together with reasonable and necessary attorneys fees, in addition to the amount the insured is entitled to under the policy.
This bill would require, by January 2028, and quarterly thereafter, an insurer that offers or sells fire insurance in this state to provide a prompt-payment compliance data report in accordance with the above-described provisions to the department, as provided. The bill would require a corporate officer of the insurer to sign the report under penalty of perjury. By expanding the crime of perjury, this bill would impose a state-mandated local program. and would subject a corporate officer who knowingly provides false information in the report to an administrative penalty, as specified. Commencing July 1, 2028, the bill would require the department to compile the information and publish a quarterly report on its internet website that details each insurers prompt-payment compliance data, as specified.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Existing law creates the Department of Insurance, headed by the Insurance Commissioner, and generally regulates the business of insurance in the state. Existing regulations prescribe specified deadlines by which an insurer is required to, among other things, respond to a notice of claim, accept or deny a claim, in whole or in part, and, upon acceptance of a claim in whole or in part, tender payment or otherwise take action to perform its obligation, as specified.
This bill, with respect to fire insurance claims arising after January 1, 2027, would codify specified provisions of the regulations prescribing the deadlines above. The bill would also make an insurer that does not comply with the deadlines liable to the insured for interest on the amount of the accepted claim, in whole or in part, at the rate of 20% per year as damages, together with reasonable and necessary attorneys fees, in addition to the amount the insured is entitled to under the policy.
This bill would require, by January 2028, and quarterly thereafter, an insurer to provide a prompt-payment compliance data report in accordance with the above-described provisions to the department, as provided. The bill would require a corporate officer of the insurer to sign the report under penalty of perjury. By expanding the crime of perjury, this bill would impose a state-mandated local program. Commencing July 1, 2028, the bill would require the department to compile the information and publish a quarterly report on its internet website that details each insurers prompt-payment compliance data, as specified.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(a)Upon receiving notice of a claim under a policy of residential property insurance, as defined in Section 10087, every insurer shall immediately, but in no event more than 15 calendar days later, do the following unless the notice of claim received is a notice of legal action:
(1)Acknowledge receipt of the notice to the claimant unless payment is made within that period of time.
(2)Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of loss.
(3)Begin any necessary investigation of the claim.
(b)(1)Upon receiving proof of loss of a residential property insurance claim, an insurer shall immediately, but in no event more than 40 calendar days later, accept or deny the claim, in whole or in part. The amounts accepted, denied, and undetermined shall be clearly documented in writing to the claimant.
(2)If more than 40 days is required to determine whether a claim subject to this section will be accepted or denied, in whole or in part, the insurer shall provide the claimant with written notice of the need for additional time within 40 days. The written notice shall specify any additional information the insurer requires in order to make a determination and state any continuing factual reasons for the insurers inability to make a determination. Thereafter, written notice shall be provided every 30 calendar days until a determination is made or notice of legal action is served. If the determination cannot be made until some future event occurs, then the insurer may comply with this continuing notice requirement by advising the claimant of the specific future event and providing an estimate as to when the determination can be made.
(c)Upon acceptance of a residential property insurance claim, in whole or in part, an insurer shall immediately, but in no event more than 30 calendar days later, tender payment or otherwise take action to perform its claim obligation. The amount of the claim to be tendered is the amount that has been accepted by the insurer. A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
SEC. 2.Section 2051 of the Insurance Code is amended to read:2051.(a)Under an open policy, the measure of indemnity in fire insurance is the expense to the insured of replacing the thing lost or injured in its condition at the time of the injury, the expense being computed as of the time of the commencement of the fire.
(b)(1)Under an open policy that requires payment of actual cash value, the measure of the actual cash value recovery, in whole or partial settlement of the claim, for either a total or partial loss to the structure or its contents, shall be the amount it would cost the insured to repair, rebuild, or replace the thing lost or injured less a fair and reasonable deduction for physical depreciation based upon its condition at the time of the injury or the policy limit, whichever is less. A deduction for physical depreciation shall apply only to components of a structure that are normally subject to repair and replacement during the useful life of that structure.
(2)If there is a total loss to the insured structure, the insurer shall pay the actual cash value associated with the primary structure and other insured structures, as determined by this section, within 30 calendar days from the date the property is determined to be a total loss. A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
(A)If the insured property is located in an area subject to an evacuation order, restricted access, or other governmental safety restrictions that prevent inspection of the property, the 30-calendar-day period described in this paragraph shall not commence until the property becomes reasonably accessible for inspection or the insurer has received the information reasonably necessary to determine that the property is a total loss.
(B)If the insurer is awaiting information from the policyholder that is material and relevant to determining the actual cash value of the primary structure and other insured structures, the 30-calendar-day period described in this paragraph shall be tolled until the necessary information is received.
SEC. 3.Section 2051.5 of the Insurance Code is amended to read:2051.5.(a)(1)Under an open policy that requires payment of the replacement cost for a loss, the measure of indemnity is the amount that it would cost the insured to repair, rebuild, or replace the thing lost or injured, without a deduction for physical depreciation, or the policy limit, whichever is less.
(2)If the policy requires the insured to repair, rebuild, or replace the damaged property in order to collect the full replacement cost, the insurer shall pay the actual cash value of the damaged property, as defined in Section 2051, until the damaged property is repaired, rebuilt, or replaced. Once the property is repaired, rebuilt, or replaced, the insurer shall pay the difference between the actual cash value payment made and the full replacement cost reasonably paid to replace the damaged property, up to the limits stated in the policy.
(3)After a payment is made pursuant to paragraph (2) of subdivision (b) of Section 2051, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, an insurer shall pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of either of the following:
(A)The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location.
(B)The date upon which the insured enters into contract or escrow to purchase a replacement home at another location pursuant to subdivision (c).
(4)A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
(b)(1)(A)A time limit of less than 12 months from the date that the first payment toward the actual cash value is made shall not be placed upon an insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(B)In the event of a loss relating to a state of emergency, as defined in Section 8558 of the Government Code, a time limit of less than 36 months from the date that the first payment toward the actual cash value is made shall not be placed upon the insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(C)This section does not prohibit an insurer from allowing the insured additional time to collect the full replacement cost.
(2)An insurer shall provide to a policyholder one or more additional extensions of six months for good cause pursuant to subparagraph (A) or (B) of paragraph (1) if the insured, acting in good faith and with reasonable diligence, encounters a delay or delays in approval for, or reconstruction of, the home or residence that are beyond the control of the insured. Circumstances beyond the control of the insured include, but are not limited to, unavoidable construction permit delays, the lack of necessary construction materials, or the unavailability of contractors to perform the necessary work.
(3)(A)In the event of a loss relating to a state of emergency, as defined in Section 8558 of the Government Code, an insurer shall not require the insured to provide proof of loss less than 100 days after the loss.
(B)The insurer shall provide to the insured one or more additional extensions of three months for submission of proof of loss for good cause if the insured, acting in good faith and with reasonable diligence, encounters a delay in providing proof of loss that is beyond the control of the insured. Circumstances beyond the control of the insured may include, but are not limited to, any of the following, where applicable to the specific claim:
(i)Delays by the insurer in acknowledging the claim or providing the claimant necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant must provide for proof of loss.
(ii)For personal property coverage, the fact that a personal property inventory is premature if the primary structure has not yet commenced construction.
(iii)The unavailability of contractors to either perform the necessary work or create an estimate to rebuild, repair, or replace.
(iv)The disability, injury, or incapacity of the insured.
(v)The inability of the insured to access the insured property as a result of governmental action or because the insured property is located in an area that is exposed to hazardous materials posing a health risk.
(c)(1)In the event of a total loss of the insured structure, a policy issued or delivered in this state shall not contain a provision that limits or denies, on the basis that the insured has decided to rebuild at a new location or to purchase an already built home at a new location, payment of the building code upgrade cost or the replacement cost, including any extended replacement cost coverage, to the extent those costs are otherwise covered by the terms of the policy or any policy endorsement. However, the measure of indemnity shall not exceed the replacement cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to repair, rebuild, or replace the insured structure at its original location.
(2)Notwithstanding any other law, for a residential property insurance policy, the measure of damages available to a policyholder to use to rebuild or replace the insured home at another location shall be the amount that would have been recoverable had the insured dwelling been rebuilt at its original location, and a deduction for the value of land at the new location shall not be permitted from that measure of damages. However, the measure of indemnity shall not exceed the cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to rebuild the insured structure at its original location.
(d)This section does not prohibit an insurer from restricting payment in cases of suspected fraud.
(e)On and after July 1, 2026, all policy forms issued or renewed by an insurer shall comply with this section in its entirety, including the changes made to this section by the act that added this paragraph.
SEC. 3.1.Section 2051.5 of the Insurance Code is amended to read:2051.5.(a)(1)Under an open policy that requires payment of the replacement cost for a loss, the measure of indemnity is the amount that it would cost the insured to repair, rebuild, or replace the thing lost or injured, without a deduction for physical depreciation, or the policy limit, whichever is less.
(2)If the policy requires the insured to repair, rebuild, or replace the damaged property in order to collect the full replacement cost, the insurer shall pay the actual cash value of the damaged property, as defined in Section 2051, until the damaged property is repaired, rebuilt, or replaced. Once the property is repaired, rebuilt, or replaced, the insurer shall pay the difference between the actual cash value payment made and the full replacement cost reasonably paid to replace the damaged property, up to the limits stated in the policy.
(3)After a payment is made pursuant to paragraph (2) of subdivision (b) of Section 2051, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, an insurer shall pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of either of the following:
(A)The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location.
(B)The date upon which the insured enters into contract or escrow to purchase a replacement home at another location pursuant to subdivision (c).
(4)A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
(b)(1)(A)A time limit of less than 12 months from the date that the first payment toward the actual cash value is made shall not be placed upon an insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(B)In the event of a loss relating to a state of emergency, as defined in Section 8558 of the Government Code, a time limit of less than 36 months from the date that the first payment toward the actual cash value is made shall not be placed upon the insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(C)This section does not prohibit an insurer from allowing the insured additional time to collect the full replacement cost.
(2)An insurer shall provide to a policyholder one or more additional extensions of six months for good cause pursuant to subparagraph (A) or (B) of paragraph (1) if the insured, acting in good faith and with reasonable diligence, encounters a delay or delays in approval for, or reconstruction of, the home or residence that are beyond the control of the insured. Circumstances beyond the control of the insured include, but are not limited to, unavoidable construction permit delays, the lack of necessary construction materials, or the unavailability of contractors to perform the necessary work.
(3)(A)In the event of a loss relating to a state of emergency, as defined in Section 8558 of the Government Code, an insurer shall not require the insured to provide proof of loss less than 100 days after the loss.
(B)The insurer shall provide to the insured one or more additional extensions of three months for submission of proof of loss for good cause if the insured, acting in good faith and with reasonable diligence, encounters a delay in providing proof of loss that is beyond the control of the insured. Circumstances beyond the control of the insured may include, but are not limited to, any of the following, where applicable to the specific claim:
(i)Delays by the insurer in acknowledging the claim or providing the claimant necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant must provide for proof of loss.
(ii)For personal property coverage, the fact that a personal property inventory is premature if the primary structure has not yet commenced construction.
(iii)The unavailability of contractors to either perform the necessary work or create an estimate to rebuild, repair, or replace.
(iv)The disability, injury, or incapacity of the insured.
(v)The inability of the insured to access the insured property as a result of governmental action or because the insured property is located in an area that is exposed to hazardous materials posing a health risk.
(c)(1)In the event of a total loss of the insured structure, a policy issued or delivered in this state shall not contain a provision that limits or denies, on the basis that the insured has decided to rebuild at a new location or to purchase an already built home at a new location, payment of the building code upgrade cost or the replacement cost, including any extended replacement cost coverage, to the extent those costs are otherwise covered by the terms of the policy or any policy endorsement. However, the measure of indemnity shall not exceed the replacement cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to repair, rebuild, or replace the insured structure at its original location.
(2)Notwithstanding any other law, for a residential property insurance policy, the measure of damages available to a policyholder to use to rebuild or replace the insured home at another location shall be the amount that would have been recoverable had the insured dwelling been rebuilt at its original location, and a deduction for the value of land at the new location shall not be permitted from that measure of damages. However, the measure of indemnity shall not exceed the cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to rebuild the insured structure at its original location.
(d)This section does not prohibit an insurer from restricting payment in cases of suspected fraud.
(e)On and after July 1, 2026, all policy forms issued or renewed by an insurer shall comply with this section in its entirety, including the changes made to this section by the act that added this paragraph.
(f)This section shall remain in effect only until January 1, 2028, and as of that date is repealed.
SEC. 3.2.Section 2051.5 is added to the Insurance Code, to read:2051.5.(a)(1)Under an open policy that requires payment of the replacement cost for a loss, the measure of indemnity is the amount that it would cost the insured to repair, rebuild, or replace the thing lost or injured, without a deduction for physical depreciation, or the policy limit, whichever is less.
(2)If the policy requires the insured to repair, rebuild, or replace the damaged property in order to collect the full replacement cost, the insurer shall pay the actual cash value of the damaged property, as defined in Section 2051, until the damaged property is repaired, rebuilt, or replaced. Once the property is repaired, rebuilt, or replaced, the insurer shall pay the difference between the actual cash value payment made and the full replacement cost reasonably paid to replace the damaged property, up to the limits stated in the policy.
(3)After a payment is made pursuant to paragraph (2) of subdivision (b) of Section 2051, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, an insurer shall pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of either of the following:
(A)The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location.
(B)The date upon which the insured enters into contract or escrow to purchase a replacement home at another location pursuant to subdivision (c).
(4)A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
(b)(1)(A)A time limit of less than 12 months from the date that the first payment toward the actual cash value is made shall not be placed upon an insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(B)If a loss is relating to a state of emergency, as defined in Section 8558 of the Government Code, a time limit of less than 36 months from the date that the first payment toward the actual cash value is made shall not be placed upon the insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(C)This section does not prohibit an insurer from allowing the insured additional time to collect the full replacement cost.
(2)An insurer shall provide to a policyholder one or more additional extensions of six months for good cause pursuant to subparagraph (A) or (B) of paragraph (1) if the insured, acting in good faith and with reasonable diligence, encounters a delay or delays in approval for, or reconstruction of, the home or residence that are beyond the control of the insured. Circumstances beyond the control of the insured include, but are not limited to, unavoidable construction permit delays, the lack of necessary construction materials, or the unavailability of contractors to perform the necessary work.
(3)(A)If a loss is relating to a state of emergency, as defined in Section 8558 of the Government Code, an insurer shall not require the insured to provide proof of loss less than 100 days after the loss.
(B)The insurer shall provide to the insured one or more additional extensions of three months for submission of proof of loss for good cause if the insured, acting in good faith and with reasonable diligence, encounters a delay in providing proof of loss that is beyond the control of the insured. Circumstances beyond the control of the insured may include, but are not limited to, any of the following, where applicable to the specific claim:
(i)Delays by the insurer in acknowledging the claim or providing the claimant necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant must provide for proof of loss.
(ii)For personal property coverage, the fact that a personal property inventory is premature if the primary structure has not yet commenced construction.
(iii)The unavailability of contractors to either perform the necessary work or create an estimate to rebuild, repair, or replace.
(iv)The disability, injury, or incapacity of the insured.
(v)The inability of the insured to access the insured property as a result of governmental action or because the insured property is located in an area that is exposed to hazardous materials posing a health risk.
(c)(1)If there is a total loss of the insured structure, a policy issued or delivered in this state shall not contain a provision that limits or denies, on the basis that the insured has decided to rebuild at a new location or to purchase an already built home at a new location, payment of the building code upgrade cost or full replacement cost, including any extended replacement cost coverage, to the extent those costs are otherwise covered by the terms of the policy or any policy endorsement. However, the measure of indemnity shall not exceed the replacement cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to repair, rebuild, or replace the insured structure at its original location, up to the limits stated in the policy. Notwithstanding a provision in a policy issued, amended, or renewed on or after January 1, 2028, for purposes of this paragraph, if the insured has decided to rebuild at a new location or to purchase an already built home at a new location, the building code upgrade cost payable shall include all costs that would have been incurred if the insured structure been completely rebuilt at its original location.
(2)Notwithstanding any other law, for a residential property insurance policy, the measure of damages available to a policyholder to use to rebuild or replace the insured home at another location shall be the amount that would have been recoverable had the insured dwelling been rebuilt at its original location, and a deduction for the value of land at the new location shall not be permitted from that measure of damages. However, the measure of indemnity shall not exceed the cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to rebuild the insured structure at its original location.
(d)This section does not prohibit an insurer from restricting payment in cases of suspected fraud.
(e)This section shall become operative on January 1, 2028.
SEC. 4.Sections 3.1 and 3.2 of this bill incorporate amendments to Section 2051.5 of the Insurance Code proposed by both this bill and Senate Bill 876. Those sections of this bill shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2027, (2) this bill amends Section 2051.5 of the Insurance Code and Senate Bill 876 amends, repeals, and adds Section 2051.5 of the Insurance Code, and (3) this bill is enacted after Senate Bill 876, in which case Section 3 of this bill shall not become operative.
(a)Upon receiving notice of a claim under a policy of residential property insurance, as defined in Section 10087, every insurer shall immediately, but in no event more than 15 calendar days later, do the following unless the notice of claim received is a notice of legal action:
(1)Acknowledge receipt of the notice to the claimant unless payment is made within that period of time.
(2)Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of loss.
(3)Begin any necessary investigation of the claim.
(b)(1)Upon receiving proof of loss of a residential property insurance claim, an insurer shall immediately, but in no event more than 40 calendar days later, accept or deny the claim, in whole or in part. The amounts accepted, denied, and undetermined shall be clearly documented in writing to the claimant.
(2)If more than 40 days is required to determine whether a claim subject to this section will be accepted or denied, in whole or in part, the insurer shall provide the claimant with written notice of the need for additional time within 40 days. The written notice shall specify any additional information the insurer requires in order to make a determination and state any continuing factual reasons for the insurers inability to make a determination. Thereafter, written notice shall be provided every 30 calendar days until a determination is made or notice of legal action is served. If the determination cannot be made until some future event occurs, then the insurer may comply with this continuing notice requirement by advising the claimant of the specific future event and providing an estimate as to when the determination can be made.
(c)Upon acceptance of a residential property insurance claim, in whole or in part, an insurer shall immediately, but in no event more than 30 calendar days later, tender payment or otherwise take action to perform its claim obligation. The amount of the claim to be tendered is the amount that has been accepted by the insurer. A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
SEC. 2.Section 2051 of the Insurance Code is amended to read:2051.(a)Under an open policy, the measure of indemnity in fire insurance is the expense to the insured of replacing the thing lost or injured in its condition at the time of the injury, the expense being computed as of the time of the commencement of the fire.
(b)(1)Under an open policy that requires payment of actual cash value, the measure of the actual cash value recovery, in whole or partial settlement of the claim, for either a total or partial loss to the structure or its contents, shall be the amount it would cost the insured to repair, rebuild, or replace the thing lost or injured less a fair and reasonable deduction for physical depreciation based upon its condition at the time of the injury or the policy limit, whichever is less. A deduction for physical depreciation shall apply only to components of a structure that are normally subject to repair and replacement during the useful life of that structure.
(2)If there is a total loss to the insured structure, the insurer shall pay the actual cash value associated with the primary structure and other insured structures, as determined by this section, within 30 calendar days from the date the property is determined to be a total loss. A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
(A)If the insured property is located in an area subject to an evacuation order, restricted access, or other governmental safety restrictions that prevent inspection of the property, the 30-calendar-day period described in this paragraph shall not commence until the property becomes reasonably accessible for inspection or the insurer has received the information reasonably necessary to determine that the property is a total loss.
(B)If the insurer is awaiting information from the policyholder that is material and relevant to determining the actual cash value of the primary structure and other insured structures, the 30-calendar-day period described in this paragraph shall be tolled until the necessary information is received.
SEC. 3.Section 2051.5 of the Insurance Code is amended to read:2051.5.(a)(1)Under an open policy that requires payment of the replacement cost for a loss, the measure of indemnity is the amount that it would cost the insured to repair, rebuild, or replace the thing lost or injured, without a deduction for physical depreciation, or the policy limit, whichever is less.
(2)If the policy requires the insured to repair, rebuild, or replace the damaged property in order to collect the full replacement cost, the insurer shall pay the actual cash value of the damaged property, as defined in Section 2051, until the damaged property is repaired, rebuilt, or replaced. Once the property is repaired, rebuilt, or replaced, the insurer shall pay the difference between the actual cash value payment made and the full replacement cost reasonably paid to replace the damaged property, up to the limits stated in the policy.
(3)After a payment is made pursuant to paragraph (2) of subdivision (b) of Section 2051, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, an insurer shall pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of either of the following:
(A)The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location.
(B)The date upon which the insured enters into contract or escrow to purchase a replacement home at another location pursuant to subdivision (c).
(4)A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
(b)(1)(A)A time limit of less than 12 months from the date that the first payment toward the actual cash value is made shall not be placed upon an insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(B)In the event of a loss relating to a state of emergency, as defined in Section 8558 of the Government Code, a time limit of less than 36 months from the date that the first payment toward the actual cash value is made shall not be placed upon the insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(C)This section does not prohibit an insurer from allowing the insured additional time to collect the full replacement cost.
(2)An insurer shall provide to a policyholder one or more additional extensions of six months for good cause pursuant to subparagraph (A) or (B) of paragraph (1) if the insured, acting in good faith and with reasonable diligence, encounters a delay or delays in approval for, or reconstruction of, the home or residence that are beyond the control of the insured. Circumstances beyond the control of the insured include, but are not limited to, unavoidable construction permit delays, the lack of necessary construction materials, or the unavailability of contractors to perform the necessary work.
(3)(A)In the event of a loss relating to a state of emergency, as defined in Section 8558 of the Government Code, an insurer shall not require the insured to provide proof of loss less than 100 days after the loss.
(B)The insurer shall provide to the insured one or more additional extensions of three months for submission of proof of loss for good cause if the insured, acting in good faith and with reasonable diligence, encounters a delay in providing proof of loss that is beyond the control of the insured. Circumstances beyond the control of the insured may include, but are not limited to, any of the following, where applicable to the specific claim:
(i)Delays by the insurer in acknowledging the claim or providing the claimant necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant must provide for proof of loss.
(ii)For personal property coverage, the fact that a personal property inventory is premature if the primary structure has not yet commenced construction.
(iii)The unavailability of contractors to either perform the necessary work or create an estimate to rebuild, repair, or replace.
(iv)The disability, injury, or incapacity of the insured.
(v)The inability of the insured to access the insured property as a result of governmental action or because the insured property is located in an area that is exposed to hazardous materials posing a health risk.
(c)(1)In the event of a total loss of the insured structure, a policy issued or delivered in this state shall not contain a provision that limits or denies, on the basis that the insured has decided to rebuild at a new location or to purchase an already built home at a new location, payment of the building code upgrade cost or the replacement cost, including any extended replacement cost coverage, to the extent those costs are otherwise covered by the terms of the policy or any policy endorsement. However, the measure of indemnity shall not exceed the replacement cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to repair, rebuild, or replace the insured structure at its original location.
(2)Notwithstanding any other law, for a residential property insurance policy, the measure of damages available to a policyholder to use to rebuild or replace the insured home at another location shall be the amount that would have been recoverable had the insured dwelling been rebuilt at its original location, and a deduction for the value of land at the new location shall not be permitted from that measure of damages. However, the measure of indemnity shall not exceed the cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to rebuild the insured structure at its original location.
(d)This section does not prohibit an insurer from restricting payment in cases of suspected fraud.
(e)On and after July 1, 2026, all policy forms issued or renewed by an insurer shall comply with this section in its entirety, including the changes made to this section by the act that added this paragraph.
SEC. 3.1.Section 2051.5 of the Insurance Code is amended to read:2051.5.(a)(1)Under an open policy that requires payment of the replacement cost for a loss, the measure of indemnity is the amount that it would cost the insured to repair, rebuild, or replace the thing lost or injured, without a deduction for physical depreciation, or the policy limit, whichever is less.
(2)If the policy requires the insured to repair, rebuild, or replace the damaged property in order to collect the full replacement cost, the insurer shall pay the actual cash value of the damaged property, as defined in Section 2051, until the damaged property is repaired, rebuilt, or replaced. Once the property is repaired, rebuilt, or replaced, the insurer shall pay the difference between the actual cash value payment made and the full replacement cost reasonably paid to replace the damaged property, up to the limits stated in the policy.
(3)After a payment is made pursuant to paragraph (2) of subdivision (b) of Section 2051, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, an insurer shall pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of either of the following:
(A)The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location.
(B)The date upon which the insured enters into contract or escrow to purchase a replacement home at another location pursuant to subdivision (c).
(4)A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
(b)(1)(A)A time limit of less than 12 months from the date that the first payment toward the actual cash value is made shall not be placed upon an insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(B)In the event of a loss relating to a state of emergency, as defined in Section 8558 of the Government Code, a time limit of less than 36 months from the date that the first payment toward the actual cash value is made shall not be placed upon the insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(C)This section does not prohibit an insurer from allowing the insured additional time to collect the full replacement cost.
(2)An insurer shall provide to a policyholder one or more additional extensions of six months for good cause pursuant to subparagraph (A) or (B) of paragraph (1) if the insured, acting in good faith and with reasonable diligence, encounters a delay or delays in approval for, or reconstruction of, the home or residence that are beyond the control of the insured. Circumstances beyond the control of the insured include, but are not limited to, unavoidable construction permit delays, the lack of necessary construction materials, or the unavailability of contractors to perform the necessary work.
(3)(A)In the event of a loss relating to a state of emergency, as defined in Section 8558 of the Government Code, an insurer shall not require the insured to provide proof of loss less than 100 days after the loss.
(B)The insurer shall provide to the insured one or more additional extensions of three months for submission of proof of loss for good cause if the insured, acting in good faith and with reasonable diligence, encounters a delay in providing proof of loss that is beyond the control of the insured. Circumstances beyond the control of the insured may include, but are not limited to, any of the following, where applicable to the specific claim:
(i)Delays by the insurer in acknowledging the claim or providing the claimant necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant must provide for proof of loss.
(ii)For personal property coverage, the fact that a personal property inventory is premature if the primary structure has not yet commenced construction.
(iii)The unavailability of contractors to either perform the necessary work or create an estimate to rebuild, repair, or replace.
(iv)The disability, injury, or incapacity of the insured.
(v)The inability of the insured to access the insured property as a result of governmental action or because the insured property is located in an area that is exposed to hazardous materials posing a health risk.
(c)(1)In the event of a total loss of the insured structure, a policy issued or delivered in this state shall not contain a provision that limits or denies, on the basis that the insured has decided to rebuild at a new location or to purchase an already built home at a new location, payment of the building code upgrade cost or the replacement cost, including any extended replacement cost coverage, to the extent those costs are otherwise covered by the terms of the policy or any policy endorsement. However, the measure of indemnity shall not exceed the replacement cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to repair, rebuild, or replace the insured structure at its original location.
(2)Notwithstanding any other law, for a residential property insurance policy, the measure of damages available to a policyholder to use to rebuild or replace the insured home at another location shall be the amount that would have been recoverable had the insured dwelling been rebuilt at its original location, and a deduction for the value of land at the new location shall not be permitted from that measure of damages. However, the measure of indemnity shall not exceed the cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to rebuild the insured structure at its original location.
(d)This section does not prohibit an insurer from restricting payment in cases of suspected fraud.
(e)On and after July 1, 2026, all policy forms issued or renewed by an insurer shall comply with this section in its entirety, including the changes made to this section by the act that added this paragraph.
(f)This section shall remain in effect only until January 1, 2028, and as of that date is repealed.
SEC. 3.2.Section 2051.5 is added to the Insurance Code, to read:2051.5.(a)(1)Under an open policy that requires payment of the replacement cost for a loss, the measure of indemnity is the amount that it would cost the insured to repair, rebuild, or replace the thing lost or injured, without a deduction for physical depreciation, or the policy limit, whichever is less.
(2)If the policy requires the insured to repair, rebuild, or replace the damaged property in order to collect the full replacement cost, the insurer shall pay the actual cash value of the damaged property, as defined in Section 2051, until the damaged property is repaired, rebuilt, or replaced. Once the property is repaired, rebuilt, or replaced, the insurer shall pay the difference between the actual cash value payment made and the full replacement cost reasonably paid to replace the damaged property, up to the limits stated in the policy.
(3)After a payment is made pursuant to paragraph (2) of subdivision (b) of Section 2051, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, an insurer shall pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of either of the following:
(A)The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location.
(B)The date upon which the insured enters into contract or escrow to purchase a replacement home at another location pursuant to subdivision (c).
(4)A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
(b)(1)(A)A time limit of less than 12 months from the date that the first payment toward the actual cash value is made shall not be placed upon an insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(B)If a loss is relating to a state of emergency, as defined in Section 8558 of the Government Code, a time limit of less than 36 months from the date that the first payment toward the actual cash value is made shall not be placed upon the insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(C)This section does not prohibit an insurer from allowing the insured additional time to collect the full replacement cost.
(2)An insurer shall provide to a policyholder one or more additional extensions of six months for good cause pursuant to subparagraph (A) or (B) of paragraph (1) if the insured, acting in good faith and with reasonable diligence, encounters a delay or delays in approval for, or reconstruction of, the home or residence that are beyond the control of the insured. Circumstances beyond the control of the insured include, but are not limited to, unavoidable construction permit delays, the lack of necessary construction materials, or the unavailability of contractors to perform the necessary work.
(3)(A)If a loss is relating to a state of emergency, as defined in Section 8558 of the Government Code, an insurer shall not require the insured to provide proof of loss less than 100 days after the loss.
(B)The insurer shall provide to the insured one or more additional extensions of three months for submission of proof of loss for good cause if the insured, acting in good faith and with reasonable diligence, encounters a delay in providing proof of loss that is beyond the control of the insured. Circumstances beyond the control of the insured may include, but are not limited to, any of the following, where applicable to the specific claim:
(i)Delays by the insurer in acknowledging the claim or providing the claimant necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant must provide for proof of loss.
(ii)For personal property coverage, the fact that a personal property inventory is premature if the primary structure has not yet commenced construction.
(iii)The unavailability of contractors to either perform the necessary work or create an estimate to rebuild, repair, or replace.
(iv)The disability, injury, or incapacity of the insured.
(v)The inability of the insured to access the insured property as a result of governmental action or because the insured property is located in an area that is exposed to hazardous materials posing a health risk.
(c)(1)If there is a total loss of the insured structure, a policy issued or delivered in this state shall not contain a provision that limits or denies, on the basis that the insured has decided to rebuild at a new location or to purchase an already built home at a new location, payment of the building code upgrade cost or full replacement cost, including any extended replacement cost coverage, to the extent those costs are otherwise covered by the terms of the policy or any policy endorsement. However, the measure of indemnity shall not exceed the replacement cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to repair, rebuild, or replace the insured structure at its original location, up to the limits stated in the policy. Notwithstanding a provision in a policy issued, amended, or renewed on or after January 1, 2028, for purposes of this paragraph, if the insured has decided to rebuild at a new location or to purchase an already built home at a new location, the building code upgrade cost payable shall include all costs that would have been incurred if the insured structure been completely rebuilt at its original location.
(2)Notwithstanding any other law, for a residential property insurance policy, the measure of damages available to a policyholder to use to rebuild or replace the insured home at another location shall be the amount that would have been recoverable had the insured dwelling been rebuilt at its original location, and a deduction for the value of land at the new location shall not be permitted from that measure of damages. However, the measure of indemnity shall not exceed the cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to rebuild the insured structure at its original location.
(d)This section does not prohibit an insurer from restricting payment in cases of suspected fraud.
(e)This section shall become operative on January 1, 2028.
SEC. 4.Sections 3.1 and 3.2 of this bill incorporate amendments to Section 2051.5 of the Insurance Code proposed by both this bill and Senate Bill 876. Those sections of this bill shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2027, (2) this bill amends Section 2051.5 of the Insurance Code and Senate Bill 876 amends, repeals, and adds Section 2051.5 of the Insurance Code, and (3) this bill is enacted after Senate Bill 876, in which case Section 3 of this bill shall not become operative.
(a)Upon receiving notice of a fire insurance claim, claim under a policy of residential property insurance, as defined in Section 10087, every insurer shall immediately, but in no event more than 15 calendar days later, do the following unless the notice of claim received is a notice of legal action:
(1)Acknowledge receipt of the notice to the claimant unless payment is made within that period of time.
(2)Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of claim. loss.
(3)Begin any necessary investigation of the claim.
(b)(1)Upon receiving proof of a fire insurance claim, loss of a residential property insurance claim, an insurer shall immediately, but in no event more than 40 calendar days later, accept or deny the claim, in whole or in part. The amounts accepted, denied, and undetermined shall be clearly documented in writing to the claimant.
(2)If more than 40 days is required to determine whether a claim subject to this section will be accepted or denied, in whole or in part, the insurer shall provide the claimant with written notice of the need for additional time within 40 days. The written notice shall specify any additional information the insurer requires in order to make a determination and state any continuing factual reasons for the insurers inability to make a determination. Thereafter, written notice shall be provided every 30 calendar days until a determination is made or notice of legal action is served. If the determination cannot be made until some future event occurs, then the insurer may comply with this continuing notice requirement by advising the claimant of the situation specific future event and providing an estimate as to when the determination can be made.
(c)Upon acceptance of a fire residential property insurance claim, in whole or in part, an insurer shall immediately, but in no event more than 30 calendar days later, tender payment or otherwise take action to perform its claim obligation. The amount of the claim to be tendered is the amount that has been accepted by the insurer. A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
SEC. 2.Section 2051 of the Insurance Code is amended to read:2051.(a)Under an open policy, the measure of indemnity in fire insurance is the expense to the insured of replacing the thing lost or injured in its condition at the time of the injury, the expense being computed as of the time of the commencement of the fire.
(b)(1)Under an open policy that requires payment of actual cash value, the measure of the actual cash value recovery, in whole or partial settlement of the claim, for either a total or partial loss to the structure or its contents, shall be the amount it would cost the insured to repair, rebuild, or replace the thing lost or injured less a fair and reasonable deduction for physical depreciation based upon its condition at the time of the injury or the policy limit, whichever is less. A deduction for physical depreciation shall apply only to components of a structure that are normally subject to repair and replacement during the useful life of that structure.
(2)If there is a total loss to the insured structure, the insurer shall pay the actual cash value associated with the primary structure and other insured structures, as determined by this section, within 30 calendar days from the date of loss. the property is determined to be a total loss. A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
(A)If the insured property is located in an area subject to an evacuation order, restricted access, or other governmental safety restrictions that prevent inspection of the property, the 30-calendar-day period described in this paragraph shall not commence until the property becomes reasonably accessible for inspection or the insurer has received the information reasonably necessary to determine that the property is a total loss.
(B)If the insurer is awaiting information from the policyholder that is material and relevant to determining the actual cash value of the primary structure and other insured structures, the 30-calendar-day period described in this paragraph shall be tolled until the necessary information is received.
SEC. 3.Section 2051.5 of the Insurance Code is amended to read:2051.5.(a)(1)Under an open policy that requires payment of the replacement cost for a loss, the measure of indemnity is the amount that it would cost the insured to repair, rebuild, or replace the thing lost or injured, without a deduction for physical depreciation, or the policy limit, whichever is less.
(2)If the policy requires the insured to repair, rebuild, or replace the damaged property in order to collect the full replacement cost, the insurer shall pay the actual cash value of the damaged property, as defined in Section 2051, until the damaged property is repaired, rebuilt, or replaced. Once the property is repaired, rebuilt, or replaced, the insurer shall pay the difference between the actual cash value payment made and the full replacement cost reasonably paid to replace the damaged property, up to the limits stated in the policy.
(3)After an actual cash value a payment is made pursuant to Section 2051, paragraph (2) of subdivision (b) of Section 2051, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, an insurer shall pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of either of the following:
(A)The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location.
(B)The date upon which the insured enters into contract or escrow to purchase a replacement home at another location. location pursuant to subdivision (c).
(4)A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
(b)(1)(A)A time limit of less than 12 months from the date that the first payment toward the actual cash value is made shall not be placed upon an insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(B)In the event of a loss relating to a state of emergency, as defined in Section 8558 of the Government Code, a time limit of less than 36 months from the date that the first payment toward the actual cash value is made shall not be placed upon the insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(C)This section does not prohibit an insurer from allowing the insured additional time to collect the full replacement cost.
(2)An insurer shall provide to a policyholder one or more additional extensions of six months for good cause pursuant to subparagraph (A) or (B) of paragraph (1) if the insured, acting in good faith and with reasonable diligence, encounters a delay or delays in approval for, or reconstruction of, the home or residence that are beyond the control of the insured. Circumstances beyond the control of the insured include, but are not limited to, unavoidable construction permit delays, the lack of necessary construction materials, or the unavailability of contractors to perform the necessary work.
(3)(A)In the event of a loss relating to a state of emergency, as defined in Section 8558 of the Government Code, an insurer shall not require the insured to provide proof of loss less than 100 days after the loss.
(B)The insurer shall provide to the insured one or more additional extensions of three months for submission of proof of loss for good cause if the insured, acting in good faith and with reasonable diligence, encounters a delay in providing proof of loss that is beyond the control of the insured. Circumstances beyond the control of the insured may include, but are not limited to, any of the following, where applicable to the specific claim:
(i)Delays by the insurer in acknowledging the claim or providing the claimant necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant must provide for proof of loss.
(ii)For personal property coverage, the fact that a personal property inventory is premature if the primary structure has not yet commenced construction.
(iii)The unavailability of contractors to either perform the necessary work or create an estimate to rebuild, repair, or replace.
(iv)The disability, injury, or incapacity of the insured.
(v)The inability of the insured to access the insured property as a result of governmental action or because the insured property is located in an area that is exposed to hazardous materials posing a health risk.
(c)(1)In the event of a total loss of the insured structure, a policy issued or delivered in this state shall not contain a provision that limits or denies, on the basis that the insured has decided to rebuild at a new location or to purchase an already built home at a new location, payment of the building code upgrade cost or the replacement cost, including any extended replacement cost coverage, to the extent those costs are otherwise covered by the terms of the policy or any policy endorsement. However, the measure of indemnity shall not exceed the replacement cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to repair, rebuild, or replace the insured structure at its original location.
(2)Notwithstanding any other law, for a residential property insurance policy, the measure of damages available to a policyholder to use to rebuild or replace the insured home at another location shall be the amount that would have been recoverable had the insured dwelling been rebuilt at its original location, and a deduction for the value of land at the new location shall not be permitted from that measure of damages. However, the measure of indemnity shall not exceed the cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to rebuild the insured structure at its original location.
(d)This section does not prohibit an insurer from restricting payment in cases of suspected fraud.
(e)On and after July 1, 2026, all policy forms issued or renewed by an insurer shall comply with this section in its entirety, including the changes made to this section by the act that added this paragraph.
(a)Upon receiving notice of a fire insurance claim, every insurer shall immediately, but in no event more than 15 calendar days later, do the following unless the notice of claim received is a notice of legal action:
(1)Acknowledge receipt of the notice to the claimant unless payment is made within that period of time.
(2)Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of claim.
(3)Begin any necessary investigation of the claim.
(b)(1)Upon receiving proof of a fire insurance claim, an insurer shall immediately, but in no event more than 40 calendar days later, accept or deny the claim, in whole or in part. The amounts accepted, denied, and undetermined shall be clearly documented in writing to the claimant.
(2)If more than 40 days is required to determine whether a claim will be accepted or denied, in whole or in part, the insurer shall provide the claimant with written notice of the need for additional time within 40 days. The written notice shall specify any additional information the insurer requires in order to make a determination and state any continuing factual reasons for the insurers inability to make a determination. Thereafter, written notice shall be provided every 30 calendar days until a determination is made or notice of legal action is served. If the determination cannot be made until some future event occurs, then the insurer may comply with this continuing notice requirement by advising the claimant of the situation and providing an estimate as to when the determination can be made.
(3)Any amount not identified by the insurer as accepted, denied, or undetermined shall be deemed accepted. Payment deadlines shall apply and late payment interest shall accrue.(c)Upon acceptance of a fire insurance claim, in whole or in part, an insurer shall immediately, but in no event more than 30 calendar days later, tender payment or otherwise take action to perform its claim obligation. The amount of the claim to be tendered is the amount that has been accepted by the insurer. A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
(d)An insurer that does not comply with subdivision (b) or (c) shall be liable to the insured for interest on the amount of the accepted claim, in whole or in part, at the rate of 20 percent per annum, together with reasonable and necessary attorneys fees, in addition to the amount the insured is entitled to under the policy.(e)This section does not prevent the award of prejudgment interest on the amount of the claim, as provided by law.(f)The obligations on fire insurers in this section are in addition to the fair claims settlement regulations that apply to all insurers.(g)If the commissioner promulgates regulations shortening the timelines in this section, the shorter timelines shall apply.(h)This section applies only to a claim that arises on or after January 1, 2027.SEC. 2.Section 2051 of the Insurance Code is amended to read:2051.(a)Under an open policy, the measure of indemnity in fire insurance is the expense to the insured of replacing the thing lost or injured in its condition at the time of the injury, the expense being computed as of the time of the commencement of the fire.
(b)(1)Under an open policy that requires payment of actual cash value, the measure of the actual cash value recovery, in whole or partial settlement of the claim, for either a total or partial loss to the structure or its contents, shall be the amount it would cost the insured to repair, rebuild, or replace the thing lost or injured less a fair and reasonable deduction for physical depreciation based upon its condition at the time of the injury or the policy limit, whichever is less. A deduction for physical depreciation shall apply only to components of a structure that are normally subject to repair and replacement during the useful life of that structure.
(2)If there is a total loss to the insured structure, the insurer shall pay the actual cash value associated with the primary structure and other insured structures, as determined by this section, within 30 calendar days from the date of loss. A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
SEC. 3.Section 2051.5 of the Insurance Code is amended to read:2051.5.(a)(1)Under an open policy that requires payment of the replacement cost for a loss, the measure of indemnity is the amount that it would cost the insured to repair, rebuild, or replace the thing lost or injured, without a deduction for physical depreciation, or the policy limit, whichever is less.
(2)If the policy requires the insured to repair, rebuild, or replace the damaged property in order to collect the full replacement cost, the insurer shall pay the actual cash value of the damaged property, as defined in Section 2051, until the damaged property is repaired, rebuilt, or replaced. Once the property is repaired, rebuilt, or replaced, the insurer shall pay the difference between the actual cash value payment made and the full replacement cost reasonably paid to replace the damaged property, up to the limits stated in the policy.
(3)After an actual cash value payment is made pursuant to Section 2051, an insurer shall pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of either of the following:
(A)The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location.
(B)The date upon which the insured enters into contract or escrow to purchase a replacement home at another location.
(4)A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
(b)(1)(A)A time limit of less than 12 months from the date that the first payment toward the actual cash value is made shall not be placed upon an insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(B)In the event of a loss relating to a state of emergency, as defined in Section 8558 of the Government Code, a time limit of less than 36 months from the date that the first payment toward the actual cash value is made shall not be placed upon the insured in order to collect the full replacement cost of the loss, subject to the policy limit.
(C)This section does not prohibit an insurer from allowing the insured additional time to collect the full replacement cost.
(2)An insurer shall provide to a policyholder one or more additional extensions of six months for good cause pursuant to subparagraph (A) or (B) of paragraph (1) if the insured, acting in good faith and with reasonable diligence, encounters a delay or delays in approval for, or reconstruction of, the home or residence that are beyond the control of the insured. Circumstances beyond the control of the insured include, but are not limited to, unavoidable construction permit delays, the lack of necessary construction materials, or the unavailability of contractors to perform the necessary work.
(3)(A)In the event of a loss relating to a state of emergency, as defined in Section 8558 of the Government Code, an insurer shall not require the insured to provide proof of loss less than 100 days after the loss.
(B)The insurer shall provide to the insured one or more additional extensions of three months for submission of proof of loss for good cause if the insured, acting in good faith and with reasonable diligence, encounters a delay in providing proof of loss that is beyond the control of the insured. Circumstances beyond the control of the insured may include, but are not limited to, any of the following, where applicable to the specific claim:
(i)Delays by the insurer in acknowledging the claim or providing the claimant necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant must provide for proof of loss.
(ii)For personal property coverage, the fact that a personal property inventory is premature if the primary structure has not yet commenced construction.
(iii)The unavailability of contractors to either perform the necessary work or create an estimate to rebuild, repair, or replace.
(iv)The disability, injury, or incapacity of the insured.
(v)The inability of the insured to access the insured property as a result of governmental action or because the insured property is located in an area that is exposed to hazardous materials posing a health risk.
(c)(1)In the event of a total loss of the insured structure, a policy issued or delivered in this state shall not contain a provision that limits or denies, on the basis that the insured has decided to rebuild at a new location or to purchase an already built home at a new location, payment of the building code upgrade cost or the replacement cost, including any extended replacement cost coverage, to the extent those costs are otherwise covered by the terms of the policy or any policy endorsement. However, the measure of indemnity shall not exceed the replacement cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to repair, rebuild, or replace the insured structure at its original location.
(2)Notwithstanding any other law, for a residential property insurance policy, the measure of damages available to a policyholder to use to rebuild or replace the insured home at another location shall be the amount that would have been recoverable had the insured dwelling been rebuilt at its original location, and a deduction for the value of land at the new location shall not be permitted from that measure of damages. However, the measure of indemnity shall not exceed the cost, including the building code upgrade cost and any extended replacement cost coverage, if applicable, to rebuild the insured structure at its original location.
(d)This section does not prohibit an insurer from restricting payment in cases of suspected fraud.
(e)On and after July 1, 2026, all policy forms issued or renewed by an insurer shall comply with this section in its entirety, including the changes made to this section by the act that added this paragraph.
(a)(1)By January 2028, and quarterly thereafter, an insurer that offers or sells fire insurance in this state shall provide a prompt-payment compliance data report to the department, including all of the following:
(A)Total number of fire insurance claims received.
(B)The number of claims handled in compliance with the deadlines provided in Section 1078.1.
(C)The number of claims that were not handled in compliance with the deadlines provided in Section 1078.1, including the dates on which those claims were handled. 1078.1.
(D)The number of days late that the insurer responded to an individual claim pursuant to subdivision (a) subdivisions (a), (b), and (c) of Section 1078.1.
(E)Total dollar amount of late payments. payments pursuant to Section 1078.1.
(F)Total dollar amount of interest paid pursuant to Section 1078.1.
(2)Each quarterly report shall provide prompt-payment compliance data from the same quarter of the preceding year.
(b)The report submitted to the department pursuant to subdivision (a) shall include all of the following:
(1)The report shall be signed under penalty of perjury by a corporate officer. Any corporate officer who knowingly provides false information in the report submitted to the department shall be subject to an administrative penalty in an amount up to one thousand five hundred dollars ($1,500) to be assessed by the commissioner, in addition to other remedies available to the department.
(2)The name and title of the corporate officer signing the report.
(3)Certification by the corporate officer signing the report that the report is accurate and complete.
(c)The department shall compile the information received under subdivision (a) and publish a quarterly report on its internet website that details each insurers prompt-payment compliance data. The data shall be displayed in a manner that is specific to each insurer. The department shall publish the first quarterly report by July 1, 2028, and shall publish an updated report every three months thereafter.
1078.1.(a)Upon receiving notice of a fire insurance claim, every insurer shall immediately, but in no event more than 15 calendar days later, do the following unless the notice of claim received is a notice of legal action:
(1)Acknowledge receipt of the notice to the claimant unless payment is made within that period of time.
(2)Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of claim.
(3)Begin any necessary investigation of the claim.
(b)(1)Upon receiving proof of a fire insurance claim, an insurer shall immediately, but in no event more than 40 calendar days later, accept or deny the claim, in whole or in part. The amounts accepted, denied, and undetermined shall be clearly documented in writing to the claimant.
(2)If more than 40 days is required to determine whether a claim will be accepted or denied, in whole or in part, the insurer shall provide the claimant with written notice of the need for additional time within 40 days. The written notice shall specify any additional information the insurer requires in order to make a determination and state any continuing factual reasons for the insurers inability to make a determination. Thereafter, written notice shall be provided every 30 calendar days until a determination is made or notice of legal action is served. If the determination cannot be made until some future event occurs, then the insurer may comply with this continuing notice requirement by advising the claimant of the situation and providing an estimate as to when the determination can be made.
(3)Any amount not identified by the insurer as accepted, denied, or undetermined shall be deemed accepted. Payment deadlines shall apply and late payment interest shall accrue.
(c)Upon acceptance of a fire insurance claim, in whole or in part, an insurer shall immediately, but in no event more than 30 calendar days later, tender payment or otherwise take action to perform its claim obligation. The amount of the claim to be tendered is the amount that has been accepted by the insurer.
(d)An insurer that does not comply with subdivision (b) or (c) shall be liable to the insured for interest on the amount of the accepted claim, in whole or in part, at the rate of 20 percent per annum as damages, annum, together with reasonable and necessary attorneys fees, in addition to the amount the insured is entitled to under the policy.
(e)This section does not prevent the award of prejudgment interest on the amount of the claim, as provided by law.
(f)The obligations on fire insurers in this section are in addition to the fair claims settlement regulations that apply to all insurers.
(g)If the commissioner promulgates regulations shortening the timelines in this section, the shorter timelines shall apply.
(h)This section applies only to a claim that arises on or after January 1, 2027.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.(a)(1)By January 2028, and quarterly thereafter, an insurer shall provide a prompt-payment compliance data report to the department, including all of the following:
(A)Total number of claims received.
(B)The number of claims handled in compliance with the deadlines provided in Section 1078.1.
(C)The number of claims that were not handled in compliance with the deadlines provided in Section 1078.1, including the dates on which those claims were handled.
(D)The number of days late that the insurer responded to an individual claim pursuant to subdivision (a) of Section 1078.1.
(E)Total dollar amount of late payments.
(F)Total dollar amount of interest paid pursuant to Section 1078.1.
(2)Each quarterly report shall provide prompt-payment compliance data from the same quarter of the preceding year.
(b)The report submitted to the department pursuant to subdivision (a) shall include all of the following:
(1)The report shall be signed under penalty of perjury by a corporate officer.
(2)The name and title of the corporate officer signing the report.
(3)Certification by the corporate officer signing the report that the report is accurate and complete.
(c)The department shall compile the information received under subdivision (a) and publish a quarterly report on its internet website that details each insurers prompt-payment compliance data. The data shall be displayed in a manner that is specific to each insurer. The department shall publish the first quarterly report by July 1, 2028, and shall publish an updated report every three months thereafter.
1078.1.(a)Upon receiving notice of a fire insurance claim, every insurer shall immediately, but in no event more than 15 calendar days later, do the following unless the notice of claim received is a notice of legal action:
(1)Acknowledge receipt of the notice to the claimant unless payment is made within that period of time.
(2)Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of claim.
(3)Begin any necessary investigation of the claim.
(b)(1)Upon receiving proof of a fire insurance claim, an insurer shall immediately, but in no event more than 40 calendar days later, accept or deny the claim, in whole or in part. The amounts accepted, denied, and undetermined shall be clearly documented in writing to the claimant.
(2)If more than 40 days is required to determine whether a claim will be accepted or denied, in whole or in part, the insurer shall provide the claimant with written notice of the need for additional time within 40 days. The written notice shall specify any additional information the insurer requires in order to make a determination and state any continuing factual reasons for the insurers inability to make a determination. Thereafter, written notice shall be provided every 30 calendar days until a determination is made or notice of legal action is served. If the determination cannot be made until some future event occurs, then the insurer may comply with this continuing notice requirement by advising the claimant of the situation and providing an estimate as to when the determination can be made.
(3)Any amount not identified by the insurer as accepted, denied, or undetermined shall be deemed accepted. Payment deadlines shall apply and late payment interest shall accrue.
(c)Upon acceptance of a fire insurance claim, in whole or in part, an insurer shall immediately, but in no event more than 30 calendar days later, tender payment or otherwise take action to perform its claim obligation. The amount of the claim to be tendered is the amount that has been accepted by the insurer.
(d)An insurer that does not comply with subdivision (b) or (c) shall be liable to the insured for interest on the amount of the accepted claim, in whole or in part, at the rate of 20 percent per annum as damages, together with reasonable and necessary attorneys fees, in addition to the amount the insured is entitled to under the policy.
(e)This section does not prevent the award of prejudgment interest on the amount of the claim, as provided by law.
(f)The obligations on fire insurers in this section are in addition to the fair claims settlement regulations that apply to all insurers.
(g)If the commissioner promulgates regulations shortening the timelines in this section, the shorter timelines shall apply.
(h)This section applies only to a claim that arises on or after January 1, 2027.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Sep 27, 2026 | In Senate. Consideration of Governor's veto pending. |
| Sep 27, 2026 | Vetoed by the Governor. |
| Sep 9, 2026 | Enrolled and presented to the Governor at 2 p.m. |
| Aug 31, 2026 | Assembly amendments concurred in. (Ayes 37. Noes 0.) Ordered to engrossing and enrolling. |
| Aug 31, 2026 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 31, 2026 | Read third time. Passed. (Ayes 70. Noes 0. Page 6996.) Ordered to the Senate. |
| Aug 31, 2026 | Read third time. Passed. Ordered to the Senate. |
| Aug 21, 2026 | Assembly Rule 69(b)(1) suspended. (Ayes 55. Noes 17. Page 6296.) |
| Aug 21, 2026 | Ordered to third reading. |
| Aug 21, 2026 | Read third time and amended. |
| Aug 21, 2026 | Assembly Rule 69(b)(1) suspended. |
| Aug 13, 2026 | Read second time. Ordered to third reading. |
| Aug 13, 2026 | From committee: Do pass. (Ayes 12. Noes 0.) (August 13). |
| Aug 13, 2026 | Assembly Rule 63 suspended. |
| Aug 5, 2026 | August 5 set for first hearing. Placed on suspense file. |
| Jun 17, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 14. Noes 0.) (June 17). Re-referred to Com. on APPR. |
| Jun 10, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on INS. |
| Jun 1, 2026 | Referred to Com. on INS. |
| May 26, 2026 | In Assembly. Read first time. Held at Desk. |
| May 26, 2026 | Read third time. Passed. (Ayes 29. Noes 6. Page 4443.) Ordered to the Assembly. |
| May 26, 2026 | Read third time. Passed. (Ayes 29. Noes 6.) Ordered to the Assembly. |
| May 14, 2026 | From committee: Do pass. (Ayes 5. Noes 2. Page 4255.) (May 14). |
| May 14, 2026 | Read second time. Ordered to third reading. |
| May 14, 2026 | From committee: Do pass. (Ayes 5. Noes 2.) (May 14). |
| May 12, 2026 | Set for hearing May 14. |
| May 11, 2026 | May 11 hearing: Placed on APPR. suspense file. |
| May 4, 2026 | Set for hearing May 11. |
| Apr 28, 2026 | Withdrawn from committee. |
| Apr 28, 2026 | Re-referred to Com. on APPR. |
| Apr 27, 2026 | Re-referred to Com. on PUB. S. |
| Apr 27, 2026 | Withdrawn from committee. |
| Apr 27, 2026 | Read second time and amended. Re-referred to Com. on APPR. |
| Apr 23, 2026 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 4. Noes 2. Page 4011.) (April 22). |
| Apr 23, 2026 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 4. Noes 2.) (April 22). |
| Apr 10, 2026 | Set for hearing April 22. |
| Apr 6, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on INS. |
| Mar 31, 2026 | April 8 hearing postponed by committee. |
| Mar 27, 2026 | Set for hearing April 8. |
| Feb 11, 2026 | Referred to Coms. on INS. and PUB. S. |
| Jan 7, 2026 | From printer. May be acted upon on or after February 6. |
| Jan 6, 2026 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 31, 2026 | Unfinished Business SB878 Pérez et al. Concurrence | Senate Floor |
Passed |
|
| Aug 31, 2026 | SB 878 Pérez Senate Third Reading By Harabedian | Assembly Floor |
Passed |
|
| Aug 13, 2026 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jun 17, 2026 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Insurance |
Passed |
|
| May 26, 2026 | Senate 3rd Reading SB878 Pérez et al. | Senate Floor |
Passed |
|
| May 14, 2026 | Do pass | Senate Standing Committee on Appropriations |
Passed |
|
| May 11, 2026 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 22, 2026 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Insurance |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 350 Conejo / San Fernando Valley | ** Support | |
| AARP | ** Support | |
| Affordable Homeownership Foundation Inc | ** Support | |
| Altadena Colab | ** Support | |
| American Property Casualty Insurance Association | ** Against | |
| Americans for Financial Reform | ** Support | |
| Ballona Wetlands Institute | ** Support | |
| Bayardo Strategies LLC | ** Support | |
| Bay Area System Change Not Climate Change | ** Support | |
| Bay Area-System Change Not Climate Change | ** Support | |
| Bright Operations | ** Support | |
| California Community Foundation | ** Support | |
| California Department of Insurance | ** Support | |
| California Insurance Commissioner Emeritus Dave Jones | ** Support | |
| California Nurses Association | ** Support | |
| Center For Biological Diversity | ** Support | |
| Center for Community Action and Environmental Justice | ** Support | |
| Center for Community Action & Environmental Justice | ** Support | |
| Civil Justice Association Of California | ** Against | |
| Climate Defenders | ** Support | |
| Consumer Action | ** Support | |
| Consumer Attorneys Of California | ** Support | |
| Consumer Federation of America | ** Support | |
| Consumer Federation Of California | ** Support | |
| Consumer Protection Policy Center | ** Support | |
| Consumer Protection Policy Center/USD School of Law | ** Support | |
| Consumer Watchdog | ** Support | |
| Courage California | ** Support | |
| Defend Ballona Wetlands | ** Support | |
| Dena Rise Up | ** Support | |
| Eaton Fire Renters Coalition | ** Support | |
| Eaton Fire Residents United | ** Support | |
| Every Fire Survivor’s Network | ** Support | |
| Extreme Weather Survivors | ** Support | |
| Extreme Weather Survivors Action Fund | ** Support | |
| Food & Water Watch | ** Support | |
| Freeport Haven | ** Support | |
| Green America | ** Support | |
| Individual | ** Support | |
| Insurance Commissioner Ricardo Lara / California Department of Insurance | ** Support | |
| Jewish Federation of The Greater San Gabriel and Pomona Valleys | ** Support | |
| Leap of Faith Family to Family Support | ** Support | |
| Los Angeles; City Of | ** Support | |
| My Tribe Rise | ** Support | |
| Pacific Association Of Domestic Insurance Companies | ** Against | |
| Pasadenans Organizing for Progress | ** Support | |
| Personal Insurance Federation Of California | ** Against | |
| Public Citizen | ** Support | |
| Rise Economy | ** Support | |
| San Gabriel Valley Council Of Governments | ** Support | |
| Sierra Club California | ** Support | |
| So Cal 350 Climate Action | ** Support | |
| SoCal 350 Climate Action | ** Support | |
| Sunflower Alliance | ** Support | |
| Team Palisades | ** Support | |
| The American Policyholder Association | ** Support | |
| United Policyholders | ** Support | |
| West Berkeley Alliance for Clean Air and Safe Jobs | ** Support | |
| Xtreme Athletics | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 878 |
VETO
Bill No: SB 878
Author: Pérez (D)
Enrolled: 9/4/26
Vote: 27
SENATE INSURANCE COMMITTEE: 4-2, 4/22/26
AYES: Padilla, Menjivar, Richardson, Rubio
NOES: Niello, Jones
NO VOTE RECORDED: Becker
SENATE APPROPRIATIONS COMMITTEE: 5-2, 5/14/26
AYES: Cervantes, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto, Dahle
SENATE FLOOR: 29-6, 5/26/26
AYES: Allen, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Cortese, Durazo, Grayson, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Padilla, Pérez, Reyes, Richardson, Rubio, Smallwood-Cuevas, Stern, Umberg, Wahab, Weber Pierson, Wiener
NOES: Alvarado-Gil, Choi, Grove, Jones, Seyarto, Strickland
NO VOTE RECORDED: Dahle, Gonzalez, Niello, Ochoa Bogh, Valladares
SENATE FLOOR: 37-0, 8/31/26
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Dahle, Durazo, Gonzalez, Grayson, Grove, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
NO VOTE RECORDED: Becker, Hurtado, Jones
ASSEMBLY FLOOR: 70-0, 8/31/26 - See last page for vote
SUBJECT: Insurance business practices
SOURCE: Insurance Commissioner Ricardo Lara/California Department of Insurance
Consumer Watchdog
Every Fire Survivor’s Network
DIGEST:
This bill codifies regulations specifying timeframes for payment of a claim under a policy of residential property insurance and adds interest payable to the insured, if those timeframes are not met.
ANALYSIS:
Existing law:
- States that under a contract of fire insurance, payment to the insured shall be made within 30 days after the amount of the loss and the liability of the insurer have been agreed upon or settled with the insured.
- Stipulates that under that same contract of fire insurance, if an insurer fails to pay the above amount within the 30 days, the payment shall accrue interest, beginning the 31st day, at the prevailing legal rate. The insurer also shall be liable for all costs of collection, including reasonable attorneys’ fees, if legal action is necessary to obtain payment after the insurer has willfully failed to pay within the 30 days.
Existing regulations:
- State that upon receiving any communication from a claimant, regarding a claim, that reasonably suggests that a response is expected, every licensee shall immediately, but in no event more than 15 calendar days after receipt of that communication, furnish the claimant with a complete response based on the facts as then known by the licensee. Communication is not required with a claimant after a notice of legal action by that claimant.
- Specify that after receiving notice of claim, every insurer shall in no more than 15 calendar days acknowledge receipt to the claimant unless payment is made within that period of time, provide to the claimant necessary forms, instructions, and reasonable assistance, including, specifying the information the claimant must provide for proof of claim, and begin investigation of the claim.
This bill:
- Requires an insurer, upon receiving notice of a claim under a policy of residential property insurance, to do the following within 15 calendar days, unless the notice of claim received is a notice of legal action:
- Acknowledge receipt of the notice to the claimant unless payment is made within that period of time.
- Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of loss.
- Begin any necessary investigation of the claim.
- Requires an insurer within 40 calendar days upon receiving proof of loss of a residential property insurance claim to accept or deny the claim, in whole or in part. The amounts accepted, denied, and undetermined shall be clearly documented in writing to the claimant.
- Requires an insurer if more than 40 days is required to determine whether a claim will be accepted or denied, in whole or in part, to provide the claimant with written notice of the need for additional time within 40 days. Thereafter, written notice shall be provided every 30 calendar days until a determination is made or notice of legal action is served. If the determination cannot be made until some future event occurs, then the insurer may comply with this continuing notice requirement by advising the claimant of the specific future event and providing an estimate as to when the determination can be made.
- Requires an insurer upon acceptance of a residential property insurance claim, in whole or in part, to immediately, but in no event more than 30 calendar days later, tender payment or otherwise take action to perform its claim obligation.
- States that a payment that is not made within 30 calendar days shall accrue interest payable to the insured.
- Requires an insurer, if there is a total loss to the insured structure, to pay the actual cash value associated with the primary structure and other insured structures, within 30 calendar days from the date the property is determined to be a total loss. Requires a payment that is not made within 30 calendar days to accrue interest payable to the insured.
- States that if the insured property is located in an area subject to an evacuation order, restricted access, or other governmental safety restrictions that prevent inspection of the property, the 30-calendar-day period described above shall not commence until the property becomes reasonably accessible for inspection or the insurer has received the information reasonably necessary to determine that the property is a total loss.
- States that if the insurer is awaiting information from the policyholder that is material and relevant to determining the actual cash value of the primary structure and other insured structures, the 30-calendar-day period described above shall be tolled until the necessary information is received.
- Requires an insurer after a payment is made for a total loss, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, to pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of either of the following, with interest owed to the insured if a payment is not made within this time period:
- The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location.
- The date upon which the insured enters into contract or escrow to purchase a replacement home at another location.
Related/Prior Legislation
SB 876 (Padilla) of the current legislative session, would require insurers to develop emergency response plans for disasters, as well as create additional consumer-related provisions for homeowners affected by wildfires by addressing matters related to underinsurance, insurer practices, claims resolution, additional living expenses, and building code upgrades.
SB 877 (Pérez) of the current legislative session, would expand the definition of “claim-related documents” under the California Standard Form Fire Insurance Policy to include all documents that relate to the evaluation of damages, whether preliminary or final, relevant to the amount of loss, covered damage, and cost of repairs.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Assembly Appropriations Committee:
The California Department of Insurance (CDI) anticipates no fiscal impact from this bill. However, it is possible for this bill to result in additional costs to CDI, in excess of $150,000, for increased administrative, investigation, and enforcement workload to the extent there is significant insurer non-compliance with prompt payment requirements or a high volume of related consumer complaints (Insurance Fund).
SUPPORT: (Verified 8/25/26)
Insurance Commissioner Ricardo Lara / California Department of Insurance (co-source)
Consumer Watchdog (co-source)
Every Fire Survivor’s Network (co-source)
350 Conejo / San Fernando Valley
AARP
Affordable Homeownership Foundation INC
Altadena Colab
Americans for Financial Reform
Ballona Wetlands Institute
Bay Area System Change Not Climate Change
Bay Area-system Change Not Climate Change
Bayardo Strategies LLC
Bright Operations
California Community Foundation
California Insurance Commissioner Emeritus Dave Jones
California Nurses Association
Center for Biological Diversity
Center for Community Action & Environmental Justice
Center for Community Action and Environmental Justice
Climate Defenders
Consumer Action
Consumer Attorneys of California
Consumer Federation of America
Consumer Federation of California
Consumer Protection Policy Center
Consumer Protection Policy Center/usd School of Law
Courage California
Defend Ballona Wetlands
Dena Rise Up
Eaton Fire Renters Coalition
Eaton Fire Residents United
Extreme Weather Survivors
Extreme Weather Survivors Action Fund
Food & Water Watch
Freeport Haven
Green America
Individual
Jewish Federation of the Greater San Gabriel and Pomona Valleys
Leap of Faith Family to Family Support
Los Angeles; City of
My Tribe Rise
Pasadenans Organizing for Progress
Public Citizen
Rise Economy
San Gabriel Valley Council of Governments
Sierra Club California
So Cal 350 Climate Action
SoCal 350 Climate Action
Sunflower Alliance
Team Palisades
The American Policyholder Association
United Policyholders
West Berkeley Alliance for Clean Air and Safe Jobs
Xtreme Athletics
OPPOSITION: (Verified 8/25/26)
None received
ARGUMENTS IN SUPPORT:
Consumer Watchdog and Every Fire Survivor’s Network, co-sponsors of this bill, state:
“SB 878 requires insurers to respond to all parts of a claim in writing, clearly identify any disputed items, and explain what is needed to resolve them. It requires insurers to pay all undisputed amounts on time, even when other portions of a claim remain unresolved. And it strengthens transparency and accountability to curb prolonged, unresolved claims.
SB 878 also speeds payouts after a disaster by requiring insurers to pay the actual cash value of a home that is a total loss after a declared disaster within thirty days of the loss, and requiring insurers to pay any undisputed portion of a home’s replacement cost within 30 days of a homeowner signing a contract to rebuild or purchasing a new home. Violation of any of these prompt payment deadlines will trigger automatic accrual of a 10% interest penalty so the consumer, not the insurer, is paid for the delay. SB 878 does not change the normal progress of a claim under active investigation. Penalties apply only when insurers fail to meet deadlines to pay.
When payments stall, recovery stalls. Timely payment determines whether families ever get back home. SB 878 speeds payment of undisputed claims and restores accountability to the claims process.”
GOVERNOR'S VETO MESSAGE:
I am returning Senate Bills 877 and 878 without my signature.
These two bills codify existing technical regulations and guidance adopted by the California Department of Insurance to clarify definitions of claim documents and specify certain timeframes for payment of claims to policyholders.
Over the last few years, the California Department of Insurance adopted several landmark regulations, such as the Sustainable Insurance Strategy and the Intervenor and Administrative Hearing Bureau Fairness and Accountability rulemaking package, both of which signify reforms decades in the making. Once fully implemented, these new processes will greatly improve access to and availability of insurance throughout California.
These bills, however, seek to codify portions of unrelated, existing regulations that are unnecessary at this time.
For this reason, I am unable to sign these bills.
ASSEMBLY FLOOR: 70-0, 8/31/26
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Castillo, Connolly, Davies, DeMaio, Elhawary, Flora, Fong, Gabriel, Garcia, Gipson, Jeff Gonzalez, Mark González, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Sanchez, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NO VOTE RECORDED: Chen, Dixon, Ellis, Hadwick, Johnson, Lackey, Macedo, Ta, Tangipa
Prepared by: Brandon Seto / INS. / (916) 651-4110
10/2/26 12:38:06
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 878 |
UNFINISHED BUSINESS
Bill No: SB 878
Author: Pérez (D), et al.
Amended: 8/21/26
Vote: 21
SENATE INSURANCE COMMITTEE: 4-2, 4/22/26
AYES: Padilla, Menjivar, Richardson, Rubio
NOES: Niello, Jones
NO VOTE RECORDED: Becker
SENATE APPROPRIATIONS COMMITTEE: 5-2, 5/14/26
AYES: Cervantes, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto, Dahle
SENATE FLOOR: 29-6, 5/26/26
AYES: Allen, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Cortese, Durazo, Grayson, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Padilla, Pérez, Reyes, Richardson, Rubio, Smallwood-Cuevas, Stern, Umberg, Wahab, Weber Pierson, Wiener
NOES: Alvarado-Gil, Choi, Grove, Jones, Seyarto, Strickland
NO VOTE RECORDED: Dahle, Gonzalez, Niello, Ochoa Bogh, Valladares
ASSEMBLY FLOOR: 70-0, 8/31/26 - See last page for vote
SUBJECT: Insurance business practices
SOURCE: Insurance Commissioner Ricardo Lara/California Department of Insurance
Consumer Watchdog
Every Fire Survivor’s Network
DIGEST:
This bill codifies regulations specifying timeframes for payment of a claim under a policy of residential property insurance and adds interest payable to the insured, if those timeframes are not met.
Assembly Amendments
1) Revise the bill’s applicability to residential property insurance. 2) Specify the circumstances where an insurer must pay actual cash value and undisputed replacement cost amounts under a total loss of a property. 3) Add coauthors. 4) Address chaptering issues with SB 876.
ANALYSIS:
Existing law:
- States that under a contract of fire insurance, payment to the insured shall be made within 30 days after the amount of the loss and the liability of the insurer have been agreed upon or settled with the insured.
- Stipulates that under that same contract of fire insurance, if an insurer fails to pay the above amount within the 30 days, the payment shall accrue interest, beginning the 31st day, at the prevailing legal rate. The insurer also shall be liable for all costs of collection, including reasonable attorneys’ fees, if legal action is necessary to obtain payment after the insurer has willfully failed to pay within the 30 days.
Existing regulations:
- State that upon receiving any communication from a claimant, regarding a claim, that reasonably suggests that a response is expected, every licensee shall immediately, but in no event more than 15 calendar days after receipt of that communication, furnish the claimant with a complete response based on the facts as then known by the licensee. Communication is not required with a claimant after a notice of legal action by that claimant.
- Specify that after receiving notice of claim, every insurer shall in no more than 15 calendar days acknowledge receipt to the claimant unless payment is made within that period of time, provide to the claimant necessary forms, instructions, and reasonable assistance, including, specifying the information the claimant must provide for proof of claim, and begin investigation of the claim.
This bill:
- Requires an insurer, upon receiving notice of a claim under a policy of residential property insurance, to do the following within 15 calendar days, unless the notice of claim received is a notice of legal action:
- Acknowledge receipt of the notice to the claimant unless payment is made within that period of time.
- Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of loss.
- Begin any necessary investigation of the claim.
- Requires an insurer within 40 calendar days upon receiving proof of loss of a residential property insurance claim to accept or deny the claim, in whole or in part. The amounts accepted, denied, and undetermined shall be clearly documented in writing to the claimant.
- Requires an insurer if more than 40 days is required to determine whether a claim will be accepted or denied, in whole or in part, to provide the claimant with written notice of the need for additional time within 40 days. Thereafter, written notice shall be provided every 30 calendar days until a determination is made or notice of legal action is served. If the determination cannot be made until some future event occurs, then the insurer may comply with this continuing notice requirement by advising the claimant of the specific future event and providing an estimate as to when the determination can be made.
- Requires an insurer upon acceptance of a residential property insurance claim, in whole or in part, to immediately, but in no event more than 30 calendar days later, tender payment or otherwise take action to perform its claim obligation.
- States that a payment that is not made within 30 calendar days shall accrue interest payable to the insured.
- Requires an insurer, if there is a total loss to the insured structure, to pay the actual cash value associated with the primary structure and other insured structures, within 30 calendar days from the date the property is determined to be a total loss. Requires a payment that is not made within 30 calendar days to accrue interest payable to the insured.
- States that if the insured property is located in an area subject to an evacuation order, restricted access, or other governmental safety restrictions that prevent inspection of the property, the 30-calendar-day period described above shall not commence until the property becomes reasonably accessible for inspection or the insurer has received the information reasonably necessary to determine that the property is a total loss.
- States that if the insurer is awaiting information from the policyholder that is material and relevant to determining the actual cash value of the primary structure and other insured structures, the 30-calendar-day period described above shall be tolled until the necessary information is received.
- Requires an insurer after a payment is made for a total loss, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, to pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of either of the following, with interest owed to the insured if a payment is not made within this time period:
- The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location.
- The date upon which the insured enters into contract or escrow to purchase a replacement home at another location.
Related/Prior Legislation
SB 876 (Padilla) of the current legislative session, would require insurers to develop emergency response plans for disasters, as well as create additional consumer-related provisions for homeowners affected by wildfires by addressing matters related to underinsurance, insurer practices, claims resolution, additional living expenses, and building code upgrades.
SB 877 (Pérez) of the current legislative session, would expand the definition of “claim-related documents” under the California Standard Form Fire Insurance Policy to include all documents that relate to the evaluation of damages, whether preliminary or final, relevant to the amount of loss, covered damage, and cost of repairs.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Assembly Appropriations Committee:
The California Department of Insurance (CDI) anticipates no fiscal impact from this bill. However, it is possible for this bill to result in additional costs to CDI, in excess of $150,000, for increased administrative, investigation, and enforcement workload to the extent there is significant insurer non-compliance with prompt payment requirements or a high volume of related consumer complaints (Insurance Fund).
SUPPORT: (Verified 8/25/26)
Insurance Commissioner Ricardo Lara / California Department of Insurance (co-source)
Consumer Watchdog (co-source)
Every Fire Survivor’s Network (co-source)
350 Conejo / San Fernando Valley
AARP
Affordable Homeownership Foundation INC
Altadena Colab
Americans for Financial Reform
Ballona Wetlands Institute
Bay Area System Change Not Climate Change
Bay Area-system Change Not Climate Change
Bayardo Strategies LLC
Bright Operations
California Community Foundation
California Insurance Commissioner Emeritus Dave Jones
California Nurses Association
Center for Biological Diversity
Center for Community Action & Environmental Justice
Center for Community Action and Environmental Justice
Climate Defenders
Consumer Action
Consumer Attorneys of California
Consumer Federation of America
Consumer Federation of California
Consumer Protection Policy Center
Consumer Protection Policy Center/usd School of Law
Courage California
Defend Ballona Wetlands
Dena Rise Up
Eaton Fire Renters Coalition
Eaton Fire Residents United
Extreme Weather Survivors
Extreme Weather Survivors Action Fund
Food & Water Watch
Freeport Haven
Green America
Individual
Jewish Federation of the Greater San Gabriel and Pomona Valleys
Leap of Faith Family to Family Support
Los Angeles; City of
My Tribe Rise
Pasadenans Organizing for Progress
Public Citizen
Rise Economy
San Gabriel Valley Council of Governments
Sierra Club California
So Cal 350 Climate Action
SoCal 350 Climate Action
Sunflower Alliance
Team Palisades
The American Policyholder Association
United Policyholders
West Berkeley Alliance for Clean Air and Safe Jobs
Xtreme Athletics
OPPOSITION: (Verified 8/25/26)
None received
ARGUMENTS IN SUPPORT:
Consumer Watchdog and Every Fire Survivor’s Network, co-sponsors of this bill, state:
“SB 878 requires insurers to respond to all parts of a claim in writing, clearly identify any disputed items, and explain what is needed to resolve them. It requires insurers to pay all undisputed amounts on time, even when other portions of a claim remain unresolved. And it strengthens transparency and accountability to curb prolonged, unresolved claims.
SB 878 also speeds payouts after a disaster by requiring insurers to pay the actual cash value of a home that is a total loss after a declared disaster within thirty days of the loss, and requiring insurers to pay any undisputed portion of a home’s replacement cost within 30 days of a homeowner signing a contract to rebuild or purchasing a new home. Violation of any of these prompt payment deadlines will trigger automatic accrual of a 10% interest penalty so the consumer, not the insurer, is paid for the delay. SB 878 does not change the normal progress of a claim under active investigation. Penalties apply only when insurers fail to meet deadlines to pay.
When payments stall, recovery stalls. Timely payment determines whether families ever get back home. SB 878 speeds payment of undisputed claims and restores accountability to the claims process.”
ASSEMBLY FLOOR: 70-0, 8/31/26
AYES: Addis, Aguiar-Curry, Ahrens, Alanis, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Castillo, Connolly, Davies, DeMaio, Elhawary, Flora, Fong, Gabriel, Garcia, Gipson, Jeff Gonzalez, Mark González, Haney, Harabedian, Hart, Hoover, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, McKinnor, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Sanchez, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NO VOTE RECORDED: Chen, Dixon, Ellis, Hadwick, Johnson, Lackey, Macedo, Ta, Tangipa
Prepared by: Brandon Seto / INS. / (916) 651-4110
9/22/26 10:44:06
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 878 |
UNFINISHED BUSINESS
Bill No: SB 878
Author: Pérez (D), et al.
Amended: 8/21/26
Vote: 21
SENATE INSURANCE COMMITTEE: 4-2, 4/22/26
AYES: Padilla, Menjivar, Richardson, Rubio
NOES: Niello, Jones
NO VOTE RECORDED: Becker
SENATE APPROPRIATIONS COMMITTEE: 5-2, 5/14/26
AYES: Cervantes, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto, Dahle
SENATE FLOOR: 29-6, 5/26/26
AYES: Allen, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Cortese, Durazo, Grayson, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Padilla, Pérez, Reyes, Richardson, Rubio, Smallwood-Cuevas, Stern, Umberg, Wahab, Weber Pierson, Wiener
NOES: Alvarado-Gil, Choi, Grove, Jones, Seyarto, Strickland
NO VOTE RECORDED: Dahle, Gonzalez, Niello, Ochoa Bogh, Valladares
ASSEMBLY FLOOR: Passed, 8/31/26
SUBJECT: Insurance business practices
SOURCE: Insurance Commissioner Ricardo Lara/California Department of Insurance
Consumer Watchdog
Every Fire Survivor’s Network
DIGEST:
This bill codifies regulations specifying timeframes for payment of a claim under a policy of residential property insurance and adds interest payable to the insured, if those timeframes are not met.
Assembly Amendments
1) Revise the bill’s applicability to residential property insurance. 2) Specify the circumstances where an insurer must pay actual cash value and undisputed replacement cost amounts under a total loss of a property. 3) Add coauthors. 4) Address chaptering issues with SB 876.
ANALYSIS:
Existing law:
- States that under a contract of fire insurance, payment to the insured shall be made within 30 days after the amount of the loss and the liability of the insurer have been agreed upon or settled with the insured.
- Stipulates that under that same contract of fire insurance, if an insurer fails to pay the above amount within the 30 days, the payment shall accrue interest, beginning the 31st day, at the prevailing legal rate. The insurer also shall be liable for all costs of collection, including reasonable attorneys’ fees, if legal action is necessary to obtain payment after the insurer has willfully failed to pay within the 30 days.
Existing regulations:
- State that upon receiving any communication from a claimant, regarding a claim, that reasonably suggests that a response is expected, every licensee shall immediately, but in no event more than 15 calendar days after receipt of that communication, furnish the claimant with a complete response based on the facts as then known by the licensee. Communication is not required with a claimant after a notice of legal action by that claimant.
- Specify that after receiving notice of claim, every insurer shall in no more than 15 calendar days acknowledge receipt to the claimant unless payment is made within that period of time, provide to the claimant necessary forms, instructions, and reasonable assistance, including, specifying the information the claimant must provide for proof of claim, and begin investigation of the claim.
This bill:
- Requires an insurer, upon receiving notice of a claim under a policy of residential property insurance, to do the following within 15 calendar days, unless the notice of claim received is a notice of legal action:
- Acknowledge receipt of the notice to the claimant unless payment is made within that period of time.
- Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of loss.
- Begin any necessary investigation of the claim.
- Requires an insurer within 40 calendar days upon receiving proof of loss of a residential property insurance claim to accept or deny the claim, in whole or in part. The amounts accepted, denied, and undetermined shall be clearly documented in writing to the claimant.
- Requires an insurer if more than 40 days is required to determine whether a claim will be accepted or denied, in whole or in part, to provide the claimant with written notice of the need for additional time within 40 days. Thereafter, written notice shall be provided every 30 calendar days until a determination is made or notice of legal action is served. If the determination cannot be made until some future event occurs, then the insurer may comply with this continuing notice requirement by advising the claimant of the specific future event and providing an estimate as to when the determination can be made.
- Requires an insurer upon acceptance of a residential property insurance claim, in whole or in part, to immediately, but in no event more than 30 calendar days later, tender payment or otherwise take action to perform its claim obligation.
- States that a payment that is not made within 30 calendar days shall accrue interest payable to the insured.
- Requires an insurer, if there is a total loss to the insured structure, to pay the actual cash value associated with the primary structure and other insured structures, within 30 calendar days from the date the property is determined to be a total loss. Requires a payment that is not made within 30 calendar days to accrue interest payable to the insured.
- States that if the insured property is located in an area subject to an evacuation order, restricted access, or other governmental safety restrictions that prevent inspection of the property, the 30-calendar-day period described above shall not commence until the property becomes reasonably accessible for inspection or the insurer has received the information reasonably necessary to determine that the property is a total loss.
- States that if the insurer is awaiting information from the policyholder that is material and relevant to determining the actual cash value of the primary structure and other insured structures, the 30-calendar-day period described above shall be tolled until the necessary information is received.
- Requires an insurer after a payment is made for a total loss, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, to pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of either of the following, with interest owed to the insured if a payment is not made within this time period:
- The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location.
- The date upon which the insured enters into contract or escrow to purchase a replacement home at another location.
Related/Prior Legislation
SB 876 (Padilla) of the current legislative session, would require insurers to develop emergency response plans for disasters, as well as create additional consumer-related provisions for homeowners affected by wildfires by addressing matters related to underinsurance, insurer practices, claims resolution, additional living expenses, and building code upgrades.
SB 877 (Pérez) of the current legislative session, would expand the definition of “claim-related documents” under the California Standard Form Fire Insurance Policy to include all documents that relate to the evaluation of damages, whether preliminary or final, relevant to the amount of loss, covered damage, and cost of repairs.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Assembly Appropriations Committee:
The California Department of Insurance (CDI) anticipates no fiscal impact from this bill. However, it is possible for this bill to result in additional costs to CDI, in excess of $150,000, for increased administrative, investigation, and enforcement workload to the extent there is significant insurer non-compliance with prompt payment requirements or a high volume of related consumer complaints (Insurance Fund).
SUPPORT: (Verified 8/25/26)
Insurance Commissioner Ricardo Lara / California Department of Insurance (co-source)
Consumer Watchdog (co-source)
Every Fire Survivor’s Network (co-source)
350 Conejo / San Fernando Valley
AARP
Affordable Homeownership Foundation INC
Altadena Colab
Americans for Financial Reform
Ballona Wetlands Institute
Bay Area System Change Not Climate Change
Bay Area-system Change Not Climate Change
Bayardo Strategies LLC
Bright Operations
California Community Foundation
California Insurance Commissioner Emeritus Dave Jones
California Nurses Association
Center for Biological Diversity
Center for Community Action & Environmental Justice
Center for Community Action and Environmental Justice (CCAEJ)
Climate Defenders
Consumer Action
Consumer Attorneys of California
Consumer Federation of America
Consumer Federation of California
Consumer Protection Policy Center
Consumer Protection Policy Center/usd School of Law
Courage California
Defend Ballona Wetlands
Dena Rise Up
Eaton Fire Renters Coalition
Eaton Fire Residents United
Extreme Weather Survivors
Extreme Weather Survivors Action Fund
Food & Water Watch
Freeport Haven
Green America
Individual
Jewish Federation of the Greater San Gabriel and Pomona Valleys
Leap of Faith Family to Family Support
Los Angeles; City of
My Tribe Rise
Pasadenans Organizing for Progress
Public Citizen
Rise Economy
San Gabriel Valley Council of Governments
Sierra Club California
So Cal 350 Climate Action
SoCal 350 Climate Action
Sunflower Alliance
Team Palisades
The American Policyholder Association
United Policyholders
West Berkeley Alliance for Clean Air and Safe Jobs
Xtreme Athletics
OPPOSITION: (Verified 8/25/26)
None received
ARGUMENTS IN SUPPORT:
Consumer Watchdog and Every Fire Survivor’s Network, co-sponsors of this bill, state:
“SB 878 requires insurers to respond to all parts of a claim in writing, clearly identify any disputed items, and explain what is needed to resolve them. It requires insurers to pay all undisputed amounts on time, even when other portions of a claim remain unresolved. And it strengthens transparency and accountability to curb prolonged, unresolved claims.
SB 878 also speeds payouts after a disaster by requiring insurers to pay the actual cash value of a home that is a total loss after a declared disaster within thirty days of the loss, and requiring insurers to pay any undisputed portion of a home’s replacement cost within 30 days of a homeowner signing a contract to rebuild or purchasing a new home. Violation of any of these prompt payment deadlines will trigger automatic accrual of a 10% interest penalty so the consumer, not the insurer, is paid for the delay. SB 878 does not change the normal progress of a claim under active investigation. Penalties apply only when insurers fail to meet deadlines to pay.
When payments stall, recovery stalls. Timely payment determines whether families ever get back home. SB 878 speeds payment of undisputed claims and restores accountability to the claims process.”
Prepared by: Brandon Seto / INS. / (916) 651-4110
8/31/26 14:41:16
**** END ****
SENATE THIRD READING
STR Bill Id:SB 878
Author:(Pérez)
As Amended Ver:August 21, 2026
Majority vote
SUMMARY
Codifies regulations specifying time-frames for payment of a claim under a policy of residential property insurance and adds interest payable to the insured, if the time-frames are not met.
Major Provisions
- Requires an insurer, upon receiving notice of a claim under a policy of residential property insurance, to do the following within 15 calendar days, unless the notice of claim received is a notice of legal action:
- Acknowledge receipt of the notice to the claimant unless payment is made within that period of time;
- Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of loss; and,
- Begin any necessary investigation of the claim.
- Requires an insurer within 40 calendar days upon receiving proof of loss of a residential property insurance claim to accept or deny the claim, in whole or in part. The amounts accepted, denied, and undetermined shall be clearly documented in writing to the claimant.
- Requires an insurer if more than 40 days is required to determine whether a claim will be accepted or denied, in whole or in part, to provide the claimant with written notice of the need for additional time within 40 days. Thereafter, written notice shall be provided every 30 calendar days until a determination is made or notice of legal action is served. If the determination cannot be made until some future event occurs, then the insurer may comply with this continuing notice requirement by advising the claimant of the specific future event and providing an estimate as to when the determination can be made.
- Requires an insurer upon acceptance of a residential property insurance claim, in whole or in part, to immediately, but in no event more than 30 calendar days later, tender payment or otherwise take action to perform its claim obligation
- States that a payment that is not made within 30 calendar days shall accrue interest payable to the insured.
- Requires an insurer, if there is a total loss to the insured structure, to pay the actual cash value associated with the primary structure and other insured structures, within 30 calendar days from the date the property is determined to be a total loss. Requires a payment that is not made within 30 calendar days to accrue interest payable to the insured.
- States that if the insured property is located in an area subject to an evacuation order, restricted access, or other governmental safety restrictions that prevent inspection of the property, the 30-calendar-day period described above shall not commence until the property becomes reasonably accessible for inspection or the insurer has received the information reasonably necessary to determine that the property is a total loss.
- States that if the insurer is awaiting information from the policyholder that is material and relevant to determining the actual cash value of the primary structure and other insured structures, the 30-calendar-day period described above shall be tolled until the necessary information is received.
- Requires an insurer after a payment is made for a total loss, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, to pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of either of the following:
- The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location; or,
- The date upon which the insured enters into contract or escrow to purchase a replacement home at another location.
- Requires that a payment that is not made within 30 calendar days to accrue interest payable to the insured.
COMMENTS
The Palisades and Eaton wildfires highlighted a number of challenges faced by the survivors. This measure attempts to address one of the challenges by improving payment of insurance claims.
California regulations require insurers to respond to a claim within 15 days of receipt; accept or deny a claim within 40 days of proof; and issue all undisputed payments within 30 days. This measure applies the same timeline into statute and applies an interest penalty when deadlines are not met. Additionally the measure requires the insured more disclosure of disputed claims and more prompt payment of undisputed claims.
More specifically, the bill imposes an automatic interest penalty if a payment deadline is missed, requires insurers to clearly identify any disputed items, in writing, within the 40-day decision window and explain what is needed to resolve them, and requires insurers to pay all undisputed amounts on time, even when other portions of a claim remain unresolved. SB 878 is attempting to get survivors quicker payments after a disaster by requiring insurers to pay the actual cash value of a home that is a total loss after a declared disaster within thirty days of the loss, and would require insurers to pay any undisputed portion of a home's replacement cost within 30 days of a homeowner signing a contract to rebuild or purchasing a new home.
The measure attempts to provide an incentive to the insurers to promptly pay otherwise they will have to pay interest on those payments owed to the insured. Insurance Code 2057 specifies a 10% interest payment.
According to the Author
According to the Author, "SB 878 strengthens existing prompt-payment insurance laws by imposing automatic interest penalties when insurers delay making coverage decisions or issuing payments. Although regulations exist that establish specific deadlines that insurers are required to meet when responding to claims, there is little penalty for insurers that fail to meet these deadlines and therefore no real carryout of these regulations by insurance providers with no actual penalty. That lack of a financial consequence allows insurance companies to make this a routine business practice. By imposing an automatic interest penalty on delayed payments, SB 878 will reduce the financial incentive for insurance companies to delay coverage decisions. Wildfire survivors should be rebuilding instead of being stuck waiting on insurers when and if they decide to respond to insurance claims."
Arguments in Support
According to the sponsor, Consumer Watchdog, "SB 878 requires insurers to respond to all parts of a claim in writing, clearly identify any disputed items, and explain what is needed to resolve them. It requires insurers to pay all undisputed amounts on time, even when other portions of a claim remain unresolved. And it strengthens transparency and accountability to curb prolonged, unresolved claims."
Arguments in Opposition
None on file.
FISCAL COMMENTS
According to the Assembly Appropriations Committee, CDI anticipates no fiscal impact from this bill. However, it is possible for this bill to result in additional costs to CDI, in excess of $150,000, for increased administrative, investigation, and enforcement workload to the extent there is significant insurer non-compliance with prompt payment requirements or a high volume of related consumer complaints (Insurance Fund).
VOTES
SENATE FLOOR: 29-6-5
YES: Allen, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Cortese, Durazo, Grayson, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Padilla, Pérez, Reyes, Richardson, Rubio, Smallwood-Cuevas, Stern, Umberg, Wahab, Weber Pierson, Wiener
NO: Alvarado-Gil, Choi, Grove, Jones, Seyarto, Strickland
ABS, ABST OR NV: Dahle, Gonzalez, Niello, Ochoa Bogh, Valladares
ASM INSURANCE: 14-0-3
YES: Calderon, Wallis, Addis, Papan, Ávila Farías, Berman, Gipson, Harabedian, Krell, Nguyen, Ortega, Petrie-Norris, Michelle Rodriguez, Valencia
ABS, ABST OR NV: Chen, Ellis, Hadwick
ASM APPROPRIATIONS: 12-0-3
YES: Wicks, Hoover, Arambula, Calderon, Caloza, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache
ABS, ABST OR NV: Dixon, Ta, Tangipa
UPDATED
VERSION: August 21, 2026
CONSULTANT: Kathleen O'Malley / INS. / (916) 319-2086 FN: 0003974
SENATE THIRD READING
STR Bill Id:SB 878
Author:(Pérez)
As Amended Ver:June 10, 2026
Majority vote
SUMMARY
Codifies regulations specifying time-frames for payment of a claim under a policy of residential property insurance and adds interest payable to the insured, if the time-frames are not met.
Major Provisions
- Requires an insurer, upon receiving notice of a claim under a policy of residential property insurance, to do the following within 15 calendar days, unless the notice of claim received is a notice of legal action:
- Acknowledge receipt of the notice to the claimant unless payment is made within that period of time;
- Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of loss; and,
- Begin any necessary investigation of the claim.
- Requires an insurer within 40 calendar days upon receiving proof of loss of a residential property insurance claim to accept or deny the claim, in whole or in part. The amounts accepted, denied, and undetermined shall be clearly documented in writing to the claimant.
- Requires an insurer if more than 40 days is required to determine whether a claim will be accepted or denied, in whole or in part, to provide the claimant with written notice of the need for additional time within 40 days. Thereafter, written notice shall be provided every 30 calendar days until a determination is made or notice of legal action is served. If the determination cannot be made until some future event occurs, then the insurer may comply with this continuing notice requirement by advising the claimant of the specific future event and providing an estimate as to when the determination can be made.
- Requires an insurer upon acceptance of a residential property insurance claim, in whole or in part, to immediately, but in no event more than 30 calendar days later, tender payment or otherwise take action to perform its claim obligation
- States that a payment that is not made within 30 calendar days shall accrue interest payable to the insured.
- Requires an insurer, if there is a total loss to the insured structure, to pay the actual cash value associated with the primary structure and other insured structures, within 30 calendar days from the date the property is determined to be a total loss. Requires a payment that is not made within 30 calendar days to accrue interest payable to the insured.
- States that if the insured property is located in an area subject to an evacuation order, restricted access, or other governmental safety restrictions that prevent inspection of the property, the 30-calendar-day period described above shall not commence until the property becomes reasonably accessible for inspection or the insurer has received the information reasonably necessary to determine that the property is a total loss.
- States that if the insurer is awaiting information from the policyholder that is material and relevant to determining the actual cash value of the primary structure and other insured structures, the 30-calendar-day period described above shall be tolled until the necessary information is received.
- Requires an insurer after a payment is made for a total loss, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, to pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of either of the following:
- The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location; or,
- The date upon which the insured enters into contract or escrow to purchase a replacement home at another location.
- Requires that a payment that is not made within 30 calendar days to accrue interest payable to the insured.
COMMENTS
The Palisades and Eaton wildfires highlighted a number of challenges faced by the survivors. This measure attempts to address one of the challenges by improving payment of insurance claims.
California regulations require insurers to respond to a claim within 15 days of receipt; accept or deny a claim within 40 days of proof; and issue all undisputed payments within 30 days. This measure applies the same timeline into statute and applies an interest penalty when deadlines are not met. Additionally, the measure requires the insured more disclosure of disputed claims and more prompt payment of undisputed claims.
More specifically, the bill imposes an automatic interest penalty if a payment deadline is missed, requires insurers to clearly identify any disputed items, in writing, within the 40-day decision window and explain what is needed to resolve them, and requires insurers to pay all undisputed amounts on time, even when other portions of a claim remain unresolved. SB 878 is attempting to get survivors quicker payments after a disaster by requiring insurers to pay the actual cash value of a home that is a total loss after a declared disaster within thirty days of the loss, and would require insurers to pay any undisputed portion of a home's replacement cost within 30 days of a homeowner signing a contract to rebuild or purchasing a new home.
The measure attempts to provide an incentive to the insurers to promptly pay otherwise they will have to pay interest on those payments owed to the insured. Insurance Code 2057 specifies a 10% interest payment.
According to the Author
According to the Author, "SB 878 strengthens existing prompt-payment insurance laws by imposing automatic interest penalties when insurers delay making coverage decisions or issuing payments. Although regulations exist that establish specific deadlines that insurers are required to meet when responding to claims, there is little penalty for insurers that fail to meet these deadlines and therefore no real carryout of these regulations by insurance providers with no actual penalty. That lack of a financial consequence allows insurance companies to make this a routine business practice. By imposing an automatic interest penalty on delayed payments, SB 878 will reduce the financial incentive for insurance companies to delay coverage decisions. Wildfire survivors should be rebuilding instead of being stuck waiting on insurers when and if they decide to respond to insurance claims."
Arguments in Support
According to the sponsor, Consumer Watchdog, "SB 878 requires insurers to respond to all parts of a claim in writing, clearly identify any disputed items, and explain what is needed to resolve them. It requires insurers to pay all undisputed amounts on time, even when other portions of a claim remain unresolved. And it strengthens transparency and accountability to curb prolonged, unresolved claims."
Arguments in Opposition
None on file.
FISCAL COMMENTS
According to the Assembly Appropriations Committee, California Department of Insurance (CDI) anticipates no fiscal impact from this bill. However, it is possible for this bill to result in additional costs to CDI, in excess of $150,000, for increased administrative, investigation, and enforcement workload to the extent there is significant insurer non-compliance with prompt payment requirements or a high volume of related consumer complaints (Insurance Fund).
VOTES
SENATE FLOOR: 29-6-5
YES: Allen, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Cortese, Durazo, Grayson, Hurtado, Laird, Limón, McGuire, McNerney, Menjivar, Padilla, Pérez, Reyes, Richardson, Rubio, Smallwood-Cuevas, Stern, Umberg, Wahab, Weber Pierson, Wiener
NO: Alvarado-Gil, Choi, Grove, Jones, Seyarto, Strickland
ABS, ABST OR NV: Dahle, Gonzalez, Niello, Ochoa Bogh, Valladares
ASM INSURANCE: 14-0-3
YES: Calderon, Wallis, Addis, Papan, Ávila Farías, Berman, Gipson, Harabedian, Krell, Nguyen, Ortega, Petrie-Norris, Michelle Rodriguez, Valencia
ABS, ABST OR NV: Chen, Ellis, Hadwick
ASM APPROPRIATIONS: 12-0-3
YES: Wicks, Hoover, Arambula, Calderon, Caloza, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache
ABS, ABST OR NV: Dixon, Ta, Tangipa
UPDATED
VERSION: June 10, 2026
CONSULTANT: Kathleen O'Malley / INS. / (916) 319-2086 FN: 0003467
Date of Hearing: August 5, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 878
Author:(Pérez) – As Amended Ver:June 10, 2026
Policy Committee: | Insurance | Vote: | 14 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill codifies certain regulations prescribing the deadlines by which an insurer must act on certain claims and requires interest to accrue on certain payments not made within 30 days.
Specifically, this bill:
- Requires an insurer, within 15 days of receiving notice of a residential property insurance claim, to acknowledge receipt of the claim, provide the claimant with certain procedural information, and begin investigation of the claim.
- Requires the insurer, within 40 days of receiving proof of loss of a claim, to accept or deny the claim in writing to the claimant, and requires the insurer to provide certain notice to claimant if more than 40 days is needed to make a determination on the claim.
- Requires the insurer, within 30 days of acceptance of a claim, to tender payment on the claim, and requires interest to accrue on a late payment at the prevailing legal rate.
- Requires an insurer, if there is a total loss to the insured structure under a fire insurance policy, to pay the actual cash value associated with the primary structure and other insured structures within 30 days from the date the property is determined to be a total loss, and requires interest to accrue on a late payment at the prevailing legal rate.
- Requires the insurer, after the actual cash value payment is made and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, to pay the undisputed amount of replacement cost associated with the primary structure and other insured structures within 30 days of the claimant entering into a contract to rebuild or purchase a replacement home, and requires interest to accrue on a late payment at the prevailing legal rate.
FISCAL EFFECT:
The Department of Insurance (CDI) anticipates no fiscal impact from this bill. However, it is possible for this bill to result in additional costs to CDI, in excess of $150,000, for increased administrative, investigation, and enforcement workload to the extent there is significant insurer non-compliance with prompt payment requirements or a high volume of related consumer complaints (Insurance Fund).
COMMENTS:
- Purpose. According to the author:
Although regulations exist that establish specific deadlines that insurers are required to meet when responding to claims, there is little penalty for insurers that fail to meet these deadlines and therefore no real carryout of these regulations by insurance providers with no actual penalty. That lack of a financial consequence allows insurance companies to make this a routine business practice. By imposing an automatic interest penalty on delayed payments, SB 878 will reduce the financial incentive for insurance companies to delay coverage decisions. Wildfire survivors should be rebuilding instead of being stuck waiting on insurers when and if they decide to respond to insurance claims.
This bill is co-sponsored by Insurance Commissioner Ricardo Lara, Consumer Watchdog, and Every Fire Survivor’s Network and supported by other consumer groups, environmental groups, and community groups.
- Claims Timeline. Existing regulations establish specific timelines for insurer communication and claim processing, requiring an insurer to respond to a claim within 15 days of receipt, accept or deny a claim within 40 days of proof, and issue all undisputed payments within 30 days. This bill codifies these regulations for a residential property insurance claim and requires interest to accrue on a late payment made by the insurer after the 30-day period.
Existing statute requires a payment for a fire insurance claim be issued within 30 days after the insurer and claimant have agreed upon or settled the loss amount and liability, with interest accruing after the 30-day period. This bill requires an insurer, if there is a total loss to the insured structure, to pay the actual cash value of the home within 30 days of the date the property is determined to be a total loss and requires the insurer to subsequently pay the undisputed amount of a home’s replacement cost within 30 days of the claimant signing a contract to rebuild or purchase a new home. This bill also requires interest to accrue on these payments if made by the insurer after the 30-day period.
Analysis Prepared by: Irene Ho / APPR. / (916) 319-2081
Date of Hearing: June 17, 2026
ASSEMBLY COMMITTEE ON INSURANCE
Lisa Calderon, Chair
SBPCA Bill Id:SB 878
Author:(Pérez) – As Amended Ver:June 10, 2026
SENATE VOTE: 29-6
SUBJECT: Insurance business practices
SUMMARY: Codifies regulations specifying time-frames for payment of a claim under a policy of residential property insurance and adds interest payable to the insured, if the time-frames are not met. Specifically, this bill:
- Requires an insurer, upon receiving notice of a claim under a policy of residential property insurance, to do the following within 15 calendar days, unless the notice of claim received is a notice of legal action:
- Acknowledge receipt of the notice to the claimant unless payment is made within that period of time;
- Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of loss; and,
- Begin any necessary investigation of the claim.
- Requires an insurer within 40 calendar days upon receiving proof of loss of a residential property insurance claim to accept or deny the claim, in whole or in part. The amounts accepted, denied, and undetermined shall be clearly documented in writing to the claimant.
- Requires an insurer if more than 40 days is required to determine whether a claim will be accepted or denied, in whole or in part, to provide the claimant with written notice of the need for additional time within 40 days. Thereafter, written notice shall be provided every 30 calendar days until a determination is made or notice of legal action is served. If the determination cannot be made until some future event occurs, then the insurer may comply with this continuing notice requirement by advising the claimant of the specific future event and providing an estimate as to when the determination can be made.
- Requires an insurer upon acceptance of a residential property insurance claim, in whole or in part, to immediately, but in no event more than 30 calendar days later, tender payment or otherwise take action to perform its claim obligation
- States that a payment that is not made within 30 calendar days shall accrue interest payable to the insured.
- Requires an insurer, if there is a total loss to the insured structure, to pay the actual cash value associated with the primary structure and other insured structures, within 30 calendar days from the date the property is determined to be a total loss. Requires a payment that is not made within 30 calendar days to accrue interest payable to the insured.
- States that if the insured property is located in an area subject to an evacuation order, restricted access, or other governmental safety restrictions that prevent inspection of the property, the 30-calendar-day period described above shall not commence until the property becomes reasonably accessible for inspection or the insurer has received the information reasonably necessary to determine that the property is a total loss.
- States that if the insurer is awaiting information from the policyholder that is material and relevant to determining the actual cash value of the primary structure and other insured structures, the 30-calendar-day period described above shall be tolled until the necessary information is received.
- Requires an insurer after a payment is made for a total loss, and after the insurer has received adequate proof of loss and documentation reasonably sufficient to determine the amount payable, to pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of either of the following:
- The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location; or,
- The date upon which the insured enters into contract or escrow to purchase a replacement home at another location.
- Requires that a payment that is not made within 30 calendar days to accrue interest payable to the insured.
EXISTING LAW:
- States that under a contract of fire insurance, payment to the insured shall be made within 30 days after the amount of the loss and the liability of the insurer have been agreed upon or settled with the insured. (Insurance Code, Section 2057)
- Stipulates that under that same contract of fire insurance, if an insurer fails to pay the above amount within the 30 days, the payment shall accrue interest, beginning the 31st day, at the prevailing legal rate. The insurer also shall be liable for all costs of collection, including reasonable attorneys’ fees, if legal action is necessary to obtain payment after the insurer has willfully failed to pay within the 30 days. (Insurance Code, Section 2057)
- States that upon receiving any communication from a claimant, regarding a claim, that reasonably suggests that a response is expected, every licensee shall immediately, but in no event more than 15 calendar days after receipt of that communication, furnish the claimant with a complete response based on the facts as then known by the licensee. Communication is not required with a claimant after a notice of legal action by that claimant. (10 CCR Section 2695.5 (b))
- Specifies that after receiving notice of claim, every insurer shall in no more than 15 calendar days acknowledge receipt to the claimant unless payment is made within that period of time, provide to the claimant necessary forms, instructions, and reasonable assistance, including, specifying the information the claimant must provide for proof of claim, and begin investigation of the claim. (10 CCR Section 2695.5 (e))
FISCAL EFFECT: Unknown.
COMMENTS:
- Purpose of the bill: According to the Author, “SB 878 strengthens existing prompt-payment insurance laws by imposing automatic interest penalties when insurers delay making coverage decisions or issuing payments. Although regulations exist that establish specific deadlines that insurers are required to meet when responding to claims, there is little penalty for insurers that fail to meet these deadlines and therefore no real carryout of these regulations by insurance providers with no actual penalty. That lack of a financial consequence allows insurance companies to make this a routine business practice. By imposing an automatic interest penalty on delayed payments, SB 878 will reduce the financial incentive for insurance companies to delay coverage decisions. Wildfire survivors should be rebuilding instead of being stuck waiting on insurers when and if they decide to respond to insurance claims.”
- Background: The Palisades and Eaton wildfires highlighted a number of challenges faced by the survivors. This measure attempts to address one of the challenges by improving payment of insurance claims.
California regulations require insurers to respond to a claim within 15 days of receipt; accept or deny a claim within 40 days of proof; and issue all undisputed payments within 30 days. This measure applies the same timeline into statute and applies an interest penalty when deadlines are not met. Additionally the measure requires the insured more disclosure of disputed claims and more prompt payment of undisputed claims.
More specifically, the bill imposes an automatic interest penalty if a payment deadline is missed, requires insurers to clearly identify any disputed items, in writing, within the 40-day decision window and explain what is needed to resolve them, and requires insurers to pay all undisputed amounts on time, even when other portions of a claim remain unresolved. SB 878 is attempting to get survivors quicker payments after a disaster by requiring insurers to pay the actual cash value of a home that is a total loss after a declared disaster within thirty days of the loss, and would require insurers to pay any undisputed portion of a home’s replacement cost within 30 days of a homeowner signing a contract to rebuild or purchasing a new home.
The measure attempts to provide an incentive to the insurers to promptly pay otherwise they will have to pay interest on those payments owed to the insured. Insurance Code 2057 specifies a 10% interest payment.
REGISTERED SUPPORT / OPPOSITION:
Support
350 Conejo / San Fernando Valley
AARP
Affordable Homeownership Foundation INC
Altadena Colab
Americans for Financial Reform
Ballona Wetlands Institute
Bay Area-system Change Not Climate Change
Bayardo Strategies LLC
Bright Operations
California Community Foundation
California Insurance Commissioner Emeritus Dave Jones
California Nurses Association
Center for Biological Diversity
Center for Community Action and Environmental Justice (CCAEJ)
Climate Defenders
Consumer Action
Consumer Attorneys of California
Consumer Federation of America
Consumer Federation of California
Consumer Protection Policy Center
Consumer Watchdog
Courage California
Defend Ballona Wetlands
Dena Rise Up
Eaton Fire Renters Coalition
Eaton Fire Residents United
Every Fire Survivor’s Network
Extreme Weather Survivors
Extreme Weather Survivors Action Fund
Food & Water Watch
Freeport Haven
Green America
Individual
Insurance Commissioner Ricardo Lara / California Department of Insurance
Jewish Federation of the Greater San Gabriel and Pomona Valleys
Leap of Faith Family to Family Support
My Tribe Rise
Pasadenans Organizing for Progress
Public Citizen
Rise Economy
Sierra Club California
So Cal 350 Climate Action
Sunflower Alliance
Team Palisades
The American Policyholder Association
West Berkeley Alliance for Clean Air and Safe Jobs
Xtreme Athletics
Opposition
None on file.
Analysis Prepared by: Kathleen O'Malley / INS. / (916) 319-2086
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 878 |
THIRD READING
Bill No: SB 878
Author: Pérez (D), et al.
Amended: 4/27/26
Vote: 21
SENATE INSURANCE COMMITTEE: 4-2, 4/22/26
AYES: Padilla, Menjivar, Richardson, Rubio
NOES: Niello, Jones
NO VOTE RECORDED: Becker
SENATE APPROPRIATIONS COMMITTEE: 5-2, 5/14/26
AYES: Cervantes, Cabaldon, Grayson, Richardson, Wahab
NOES: Seyarto, Dahle
SUBJECT: Insurance business practices
SOURCE: Insurance Commissioner Ricardo Lara/California Department of Insurance
Consumer Watchdog
Every Fire Survivor’s Network
DIGEST:
This bill 1) establishes timelines for insurers to acknowledge, investigate, and determine the status of fire insurance claims, and requires documented justifications for any delays; and 2) requires that certain payments be issued within 30 days of claim acceptance, the date of loss, or the execution of a replacement contract, with interest accruing on any late payments, as specified.
ANALYSIS:
Existing law:
- States that under a contract of fire insurance, payment to the insured shall be made within 30 days after the amount of the loss and the liability of the insurer have been agreed upon or settled with the insured.
- Stipulates that under that same contract of fire insurance, if an insurer fails to pay the above amount within the 30 days, the payment shall accrue interest, beginning the 31st day, at the prevailing legal rate. The insurer also shall be liable for all costs of collection, including reasonable attorneys’ fees, if legal action is necessary to obtain payment after the insurer has willfully failed to pay within the 30 days.
Existing regulations:
- State that upon receiving any communication from a claimant, regarding a claim, that reasonably suggests that a response is expected, every licensee shall immediately, but in no event more than 15 calendar days after receipt of that communication, furnish the claimant with a complete response based on the facts as then known by the licensee. Communication is not required with a claimant after a notice of legal action by that claimant.
- Specify that after receiving notice of claim, every insurer shall in no more than 15 calendar days acknowledge receipt to the claimant unless payment is made within that period of time, provide to the claimant necessary forms, instructions, and reasonable assistance, including, specifying the information the claimant must provide for proof of claim, and begin investigation of the claim.
This bill:
- Codifies existing regulations specifying that upon receiving notice of a fire insurance claim, every insurer within 15 calendar days must:
- Send the claimant an acknowledgement of the receipt of the notice unless payment is made within that time.
- Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of claim.
- Begin any necessary investigation of the claim.
- States that upon receiving proof of a fire insurance claim, an insurer shall within 40 calendar days, accept or deny the claim, in whole or in part, and that amounts accepted, denied, and undetermined be documented in writing to the claimant.
- Specifies that if more than 40 days are required to determine whether a claim will be accepted or denied, in whole or in part, the insurer shall provide the claimant with written notice of the need for additional time within 40 days, detail any additional information needed, and explain the inability to make a determination. Such a written notice must be provided every 30 days until a determination is made or notice of legal action is served. If the determination is dependent on a future event, then the insurer must advise the claimant of the situation and give an estimate of when the determination can be made.
- States that upon acceptance of a fire insurance claim, in whole or in part, an insurer must within 30 calendar days provide payment based on the amount accepted by the insurer.
- States that if there is a total loss to an insured structure under an open policy that requires payment of actual cash value (ACV), the insurer must pay the ACV associated with the primary structure and other insured structures within 30 calendar days from the date of loss.
- Stipulates that an insurer, after an ACV payment is made under an open policy requiring as such, must pay the undisputed replacement cost for the primary and other insured structures, up to policy limits, within 30 calendar days of either the insured obtaining a valid, executed contract with a licensed contractor to rebuild the insured structure at its original or new location, or entering into contract or escrow to purchase a replacement home at another location.
- Provides that unpaid claims beyond the 30-day periods specified above shall accrue interest, payable to the insured.
Related/Prior Legislation
SB 876 (Padilla) of the current legislative session, would require insurers to develop emergency response plans for disasters, as well as create additional consumer-related provisions for homeowners affected by wildfires by addressing matters related to underinsurance, insurer practices, claims resolution, additional living expenses, and building code upgrades.
SB 877 (Pérez) of the current legislative session, would expand the definition of “claim-related documents” under the California Standard Form Fire Insurance Policy to include all documents that relate to the evaluation of damages, whether preliminary or final, that relate in any way to the amount of loss, covered damage, and cost of repairs.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Senate Appropriations Committee:
Unknown potential increase in administrative and enforcement workload for the California Department of Insurance (Insurance Fund). Actual fiscal impacts will depend on the level of insurer compliance with the bill’s expanded notification and claims payment requirements, the volume of consumer complaints, and the complexity of any resulting investigations.
SUPPORT: (Verified 5/15/26)
Insurance Commissioner Ricardo Lara/California Department of Insurance (co-source)
Every Fire Survivor’s Network (co-source)
350 Conejo / San Fernando Valley
AARP
Affordable Homeownership Foundation INC
Altadena Colab
Americans for Financial Reform
Ballona Wetlands Institute
Bay Area System Change Not Climate Change
Bright Operations
California Community Foundation
California Insurance Commissioner Emeritus Dave Jones
California Nurses Association
Center for Biological Diversity
Center for Community Action and Environmental Justice
Climate Defenders
Consumer Action
Consumer Attorneys of California
Consumer Federation of America
Consumer Federation of California
Consumer Protection Policy Center
Courage California
Defend Ballona Wetlands
Dena Rise Up
Eaton Fire Renters Coalition
Eaton Fire Residents United
Extreme Weather Survivors
Food & Water Watch
Freeport Haven
Green America
Jewish Federation of the Greater San Gabriel and Pomona Valleys
Leap of Faith Family to Family Support
Los Angeles; City of
My Tribe Rise
Pasadenans Organizing for Progress
Public Citizen
Rise Economy
San Gabriel Valley Council of Governments
Sierra Club California
SoCal 350 Climate Action
Sunflower Alliance
Team Palisades
The American Policyholder Association
United Policyholders
West Berkeley Alliance for Clean Air and Safe Jobs
Xtreme Athletics
545 Individuals
OPPOSITION: (Verified 5/15/26)
American Property Casualty Insurance Association
Civil Justice Association of California
Pacific Association of Domestic Insurance Companies
Personal Insurance Federation of California
ARGUMENTS IN SUPPORT: Consumer Watchdog and Every Fire Survivor’s Network, sponsors of this bill, state:
“SB 878 requires insurers to respond to all parts of a claim in writing, clearly identify any disputed items, and explain what is needed to resolve them. It requires insurers to pay all undisputed amounts on time, even when other portions of a claim remain unresolved. And it strengthens transparency and accountability to curb prolonged, unresolved claims.
SB 878 also speeds payouts after a disaster by requiring insurers to pay the actual cash value of a home that is a total loss after a declared disaster within thirty days of the loss, and requiring insurers to pay any undisputed portion of a home’s replacement cost within 30 days of a homeowner signing a contract to rebuild or purchasing a new home. Violation of any of these prompt payment deadlines will trigger automatic accrual of a 10% interest penalty so the consumer, not the insurer, is paid for the delay. SB 878 does not change the normal progress of a claim under active investigation. Penalties apply only when insurers fail to meet deadlines to pay.
When payments stall, recovery stalls. Timely payment determines whether families ever get back home. SB 878 speeds payment of undisputed claims and restores accountability to the claims process.”
ARGUMENTS IN OPPOSITION: The insurance associations known as the “Trades” state in opposition to a previous version of this bill:
“SB 878 would expand and codify regulatory prompt‑payment timelines for fire insurance claims and impose automatic penalties for noncompliance, including interest at a rate of 20 percent per year and mandatory payment of the insured’s attorney’s fees. These penalties would apply even when delays are caused by factors outside an insurer’s control, such as incomplete information, large‑scale catastrophes, or ongoing coverage investigations. Such inflexible statutory damages are disproportionate, untethered from actual consumer harm, and provide incentives for attorneys to draw out settlement disputes.
The bill also deems any claim amount not expressly accepted, denied, or identified as undetermined within prescribed timeframes to be automatically accepted. This provision creates significant risk of overpayment and disputes, particularly in complex or evolving loss scenarios, and undermines careful, accurate claim evaluation.
In addition, SB 878 would require insurers to submit quarterly prompt‑payment compliance reports signed under penalty of perjury by a corporate officer, and would mandate public, insurer‑specific publication of those data by the Department of Insurance. These reporting and public disclosure requirements create reputational risk based on incomplete or misleading data and add substantial compliance costs without clear evidence that existing enforcement tools are inadequate.
California already has robust fair claims settlement regulations, strong regulatory oversight, and enforcement authority to address untimely claims handling.
Codifying regulatory timelines, layering punitive statutory damages, and requiring public scorecard‑style reporting is likely to increase litigation, raise claim costs, and further strain an already fragile property insurance market—ultimately to the detriment of consumers.”
Prepared by: Brandon Seto / INS. / (916) 651-4110
5/16/26 9:40:21
**** END ****
SENATE COMMITTEE ON
Senator Sabrina Cervantes, Chair
2025 - 2026 Regular Session
SB 878 (Pérez) - Insurance business practices
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
SB 878 establishes timelines for insurers to acknowledge, investigate, and determine the status of fire insurance claims, and requires documented justifications for any delays. SB 878 also requires that payment be issued within 30 days of claim acceptance, the date of loss, or the execution of a replacement contract, with interest accruing on any late payments, as specified.
Fiscal Impact:
Unknown potential increase in administrative and enforcement workload for CDI (Insurance Fund). Actual fiscal impacts will depend on the level of insurer compliance with the bill’s expanded notification and claims payment requirements, the volume of consumer complaints, and the complexity of any resulting investigations.
Background:
Under existing law, payments for fire insurance claims must be issued within 30 days after the insurer and the insured have agreed upon or settled the loss amount and liability. If the insurer fails to make payment within this period, interest begins to accrue on the 31st day at the prevailing legal rate. Furthermore, should an insurer willfully fail to pay within the 30-day window, they are liable for all costs of collection, including reasonable attorneys’ fees, if legal action is required to obtain payment.
Current regulations also establish specific timelines for insurer communication and claim processing. Upon receiving notice of a claim, an insurer has 15 calendar days to acknowledge the claim, provide necessary forms and instructions, and begin an investigation, unless payment is made during that time. Similarly, every licensee is required to provide a complete response to any claimant communication that reasonably suggests a response is expected within 15 calendar days of receipt. This communication requirement remains in effect until a notice of legal action has been filed by the claimant.
Proposed Law:
- Requires insurers, within 15 calendar days of receiving a fire insurance claim that is not a notice of legal action, to do the following:
- Acknowledge receipt of the notice to the claimant unless payment is made within that period of time.
- Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of claim.
- Begin any necessary investigation of the claim.
- Requires insurers, within 40 calendar days of receiving a fire insurance claim, to accept or deny the claim, in whole or in part.
- Requires the amounts accepted, denied, and undetermined to be clearly documented in writing to the claimant.
- Requires insurers to provide a written notice to a claimant if a determination cannot be made within 40 days; such notice must specify the additional information needed and the continuing factual reasons for the insurer’s inability to make a determination.
- Requires written notice to be provided every 30 calendar days thereafter, until a determination is made or notice of legal action is served. If the determination cannot be made until some future event occurs, the insurer is authorized to comply with this continuous notice requirement by advising the claimant of the situation and providing an estimate of when the determination can be made.
- Requires an insurer, within 30 calendar days of accepting a fire insurance claim, to tender payment or otherwise take action to perform its claim obligation.
- If there is a total loss to an insured structure under an open policy that requires payment of actual cash value (ACV), requires the insurer to pay the ACV associated with the primary structure and other insured structures within 30 calendar days from the date of loss.
- Requires an insurer, after an ACV payment is made under an open policy requiring such, to pay the undisputed replacement cost for the primary and other insured structures, up to policy limits, within 30 calendar days of either:
- The date upon which the insured obtains a valid, executed contract with a licensed contractor to rebuild the insured structure at its original or new location.
- The date the insured enters into contract or escrow to purchase a replacement home at another location.
- Provides that unpaid claims beyond the 30-day periods specified above shall accrue interest, payable to the insured.
-- END --
SENATE COMMITTEE ON INSURANCE
Senator Stephen Padilla, Chair
2025 - 2026 Regular
Bill No: SB 878 Hearing Date: April 22, 2026
Author: | Pérez | ||
Version: | April 6, 2026 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Brandon Seto | ||
SUBJECT: Insurance business practices
DIGEST:
Creates timelines whereby insurers must acknowledge receipt of claims, make determinations about whether to accept or deny a claim, or explain to the policyholder the need for more time to make these determinations, and subsequently pay the claims. Deems any outstanding amount of a claim not addressed by the insurer to be accepted and imposes penalties for late payment. Beginning January 2028, requires insurers to submit data relevant to their compliance with the bill’s provisions to the California Department of Insurance (CDI), who must compile this data and starting July 2028, post a quarterly report of payment practices by individual insurers.
ANALYSIS:
Existing law:
- States that under a contract of fire insurance, payment to the insured shall be made within 30 days after the amount of the loss and the liability of the insurer have been agreed upon or settled with the insured.
- Stipulates that under that same contract of fire insurance, if an insurer fails to pay the above amount within the 30 days, the payment shall accrue interest, beginning the 31st day, at the prevailing legal rate. The insurer also shall be liable for all costs of collection, including reasonable attorneys’ fees, if legal action is necessary to obtain payment after the insurer has willfully failed to pay within the 30 days.
Existing regulations:
- State that upon receiving any communication from a claimant, regarding a claim, that reasonably suggests that a response is expected, every licensee shall immediately, but in no event more than 15 calendar days after receipt of that communication, furnish the claimant with a complete response based on the facts as then known by the licensee. Communication is not required with a claimant after a notice of legal action by that claimant.
- Specify that after receiving notice of claim, every insurer shall in no more than 15 calendar days acknowledge receipt to the claimant unless payment is made within that period of time, provide to the claimant necessary forms, instructions, and reasonable assistance, including, specifying the information the claimant must provide for proof of claim, and begin investigation of the claim.
This bill:
- Requires insurers that offer or sell fire insurance, by January 2028, and quarterly thereafter, to provide a prompt-payment compliance data report to CDI, including all of the following:
- Total number of claims received.
- The number of claims handled in compliance with the deadlines provided in the bill’s provisions.
- The number of claims that were not handled in compliance with the deadlines provided in the bill’s provisions, including the dates on which those claims were handled.
- The number of days late that the insurer responded to an individual claim pursuant to the deadlines established by the bill.
- Total dollar amount of late payments.
- Total dollar amount of any interest paid.
- Requires each quarterly prompt-payment compliance report to provide data from the same quarter of the preceding year.
- Specifies that these reports must be signed by a corporate officer, who must provide their name and title, and a certification that the report is accurate and complete. A corporate officer who knowingly provides false information in a report will be subject to an administrative penalty, as determined by CDI.
- States that CDI must compile the reports’ information and publish a quarterly report on its website that details each insurer’s prompt-payment compliance data, in a manner specific to each insurer. The first quarterly report must be published by July 1, 2028, and updated subsequently every three months.
- Stipulates that upon receiving notice of a fire insurance claim, excepting a legal action, every insurer within 15 calendar days must:
- Send the claimant an acknowledgement of the receipt of the notice unless payment is made within that time.
- Provide the claimant with the necessary forms, instructions, and reasonable assistance, including, but not limited to, specifying the information the claimant is required to provide for proof of claim.
- Begin any necessary investigation of the claim.
- States that upon receiving proof of a fire insurance claim, an insurer shall within 40 calendar days, accept or deny the claim, in whole or in part, and that amounts accepted, denied, and undetermined be documented in writing to the claimant.
- Specifies that if more than 40 days is required to determine whether a claim will be accepted or denied, in whole or in part, the insurer shall provide the claimant with written notice of the need for additional time within 40 days, detail any additional information needed, and explain the inability to make a determination. Such a written notice must be provided every 30 days until a determination is made or notice of legal action is served. If the determination is dependent on a future event, then the insurer must advise the claimant of the situation and give an estimate of when the determination can be made.
- Stipulates that any amount not identified by the insurer as accepted, denied, or undetermined will be deemed accepted, and that late payment interest will accrue under applicable deadlines.
- States that upon acceptance of a fire insurance claim, in whole or in part, an insurer must within 30 calendar days provide payment based on the amount accepted by the insurer, or fulfill its claim obligation.
- Specifies that an insurer that does not comply with these provisions and payment conditions will be liable to the insured for an additional interest payment on the amount of the accepted claim, in whole or in part, at the rate of 20 percent per year, along with attorney’s fees.
- Provides that if the Insurance Commissioner promulgates regulations shortening the timelines in this bill, the shorter timelines shall apply.
- Applies these provisions to claims beginning on or after January 1, 2027.
Background
According to the author:
“SB 878 strengthens existing prompt-payment insurance laws by imposing automatic interest penalties when insurers delay making coverage decisions or issuing payments. Although regulations exist that establish specific deadlines that insurers are required to meet when responding to claims, there is little penalty for insurers that fail to meet these deadlines and therefore no real carryout of these regulations by insurance providers with no actual penalty. That lack of a financial consequence allows insurance companies to make this a routine business practice. By imposing a 20% interest penalty on delayed payments, and deeming any unanswered claim accepted, SB 878 will reduce the financial incentive for insurance companies to delay coverage decisions. Wildfire survivors should be rebuilding instead of being stuck waiting on insurers when and if they decide to respond to insurance claims.”
Suggested Amendments
Delete Section 1078.
Delete paragraph (3) of subdivision (b), and subdivisions (d), (e), (f), (g), and (h) of Section 1078.1.
Add the following:
Section 2051 of the Insurance Code is amended to read:
2051.
(a) Under an open policy, the measure of indemnity in fire insurance is the expense to the insured of replacing the thing lost or injured in its condition at the time of the injury, the expense being computed as of the time of the commencement of the fire.
(b) (1) Under an open policy that requires payment of actual cash value, the measure of the actual cash value recovery, in whole or partial settlement of the claim, for either a total or partial loss to the structure or its contents, shall be the amount it would cost the insured to repair, rebuild, or replace the thing lost or injured less a fair and reasonable deduction for physical depreciation based upon its condition at the time of the injury or the policy limit, whichever is less. A deduction for physical depreciation shall apply only to components of a structure that are normally subject to repair and replacement during the useful life of that structure.
(2) If there is a total loss to the insured structure, the insurer shall pay the actual cash value associated with the primary structure and other insured structures, as determined by this section, within 30 calendar days from the date of loss. A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
Section 2051.5 of the Insurance Code is amended to read:
2051.5.
(a) (1) Under an open policy that requires payment of the replacement cost for a loss, the measure of indemnity is the amount that it would cost the insured to repair, rebuild, or replace the thing lost or injured, without a deduction for physical depreciation, or the policy limit, whichever is less.
(2) If the policy requires the insured to repair, rebuild, or replace the damaged property in order to collect the full replacement cost, the insurer shall pay the actual cash value of the damaged property, as defined in Section 2051, until the damaged property is repaired, rebuilt, or replaced. Once the property is repaired, rebuilt, or replaced, the insurer shall pay the difference between the actual cash value payment made and the full replacement cost reasonably paid to replace the damaged property, up to the limits stated in the policy.
(3) After an actual cash value payment is made pursuant to Section 2051, an insurer shall pay the undisputed amount of replacement cost associated with the primary structure and other insured structures, up to the limits in the policy, within 30 calendar days from the occurrence of one the following:
(A) The date upon which the insured obtains a valid and executed contract with a licensed contractor to rebuild the insured structure at its original location or at another location.
(B) The date upon which the insured enters into contract or escrow to purchase a replacement home at another location.
(4) A payment that is not made pursuant to this section within 30 calendar days shall accrue interest payable to the insured pursuant to Section 2057.
Related/Prior Legislation
SB 876 (Padilla) would require insurers to develop emergency response plans for disasters, as well as create additional consumer-related provisions for homeowners affected by wildfires by addressing matters related to underinsurance, insurer practices, claims resolution, additional living expenses, personal property contents coverage, and building code upgrades. This bill is pending in Senate Judiciary Committee.
SB 877 (Pérez) requires insurers in the event of a covered loss under a residential property insurance policy, to provide the policyholders with claims-related documents and revisions, along with written explanations of any changes, and the person who made them. This bill is pending in Senate Insurance Committee.
Double Referral
Should this bill pass out of this committee, it will be referred to Senate Public Safety Committee, however amendments have removed the provisions of the bill under that committee’s purview. As such, the bill will be re-referred to Senate Appropriations Committee.
ARGUMENTS IN SUPPORT:
Consumer Watchdog and Every Fire Survivor’s Network, sponsors of the bill, state:
“California families are facing two systemic insurance failures. We are afraid we will be unable to buy or keep our insurance when we rebuild. And even when we can buy coverage, we cannot
reliably access the benefits we paid for. SB 878 helps ensure we get the benefits we paid for.
After the Eaton and Palisades fires, 70% of insured Los Angeles fire survivors reported that
delays, denials, and underpayments are derailing their recovery, according to Department of
Angels research. On the one-year anniversary of the fires, 2 in 5 insured survivors report that
inconsistent and delayed insurer communications continue to stand in the way of rebuilding. Survivors have documented consistent delay mechanisms: partial disputes used to delay payment of undisputed amounts, rotating adjusters that reset progress and miss deadlines, verbal only denials that prevent enforcement or appeal, and prolonged open claims without
written decisions.
SB 878 enforces timelines already in law by imposing a 20% interest penalty on delayed payments. It requires insurers to respond in writing, clearly identify any disputed items, and explain what is needed to resolve them. It requires insurers to pay all undisputed amounts on time, even when other portions of a claim remain unresolved. And it strengthens transparency and accountability to curb prolonged, unresolved claims.
SB 878 does not change the normal progress of a claim under active investigation. Penalties
apply only when insurers fail to meet deadlines to respond. If an insurer is missing information,
they need only tell the policyholder in writing what they need. If the insurer has scheduled a
needed inspection, they need only tell the policyholder in writing they are waiting for the
inspection. SB 878 penalizes tactics that delay for delay’s sake and leave consumers waiting
years for resolution. Insurers need only pay undisputed amounts or tell consumers what is
needed to resolve a claim to avoid penalty. When payments stall, recovery stalls. Timely payment determines whether families ever get back home. SB 878 removes the financial incentive to delay and restores accountability to the claims process.”
ARGUMENTS IN OPPOSITION:
The insurance associations known as the “Trades” state:
“SB 878 would expand and codify regulatory prompt‑payment timelines for fire insurance claims and impose automatic penalties for noncompliance, including interest at a rate of 20 percent per year and mandatory payment of the insured’s attorney’s fees. These penalties would apply even when delays are caused by factors outside an insurer’s control, such as incomplete information, large‑scale catastrophes, or ongoing coverage investigations. Such inflexible statutory damages are disproportionate, untethered from actual consumer harm, and provide incentives for attorneys to draw out settlement disputes.
The bill also deems any claim amount not expressly accepted, denied, or identified as undetermined within prescribed timeframes to be automatically accepted. This provision creates significant risk of overpayment and disputes, particularly in complex or evolving loss scenarios, and undermines careful, accurate claim evaluation.
In addition, SB 878 would require insurers to submit quarterly prompt‑payment compliance reports signed under penalty of perjury by a corporate officer, and would mandate public, insurer‑specific publication of those data by the Department of Insurance. These reporting and public disclosure requirements create reputational risk based on incomplete or misleading data and add substantial compliance costs without clear evidence that existing enforcement tools are inadequate.
California already has robust fair claims settlement regulations, strong regulatory oversight, and enforcement authority to address untimely claims handling. Codifying regulatory timelines, layering punitive statutory damages, and requiring public scorecard‑style reporting is likely to increase litigation, raise claim costs, and further strain an already fragile property insurance market—ultimately to the detriment of consumers.”
SUPPORT:
Consumer Watchdog/Every Fire Survivor’s Network (Sponsors)
350 Conejo / San Fernando Valley
AARP
Affordable Homeownership Foundation INC
Altadena Colab
Americans for Financial Reform
Ballona Wetlands Institute
Bay Area System Change Not Climate Change
Bright Operations
California Community Foundation
California Insurance Commissioner Emeritus Dave Jones
California Nurses Association
Center for Biological Diversity
Center for Community Action and Environmental Justice
Climate Defenders
Consumer Action
Consumer Attorneys of California
Consumer Federation of America
Consumer Federation of California
Consumer Protection Policy Center
Courage California
Defend Ballona Wetlands
Dena Rise Up
Eaton Fire Renters Coalition
Eaton Fire Residents United
Extreme Weather Survivors
Food & Water Watch
Freeport Haven
Green America
Jewish Federation of the Greater San Gabriel and Pomona Valleys
Leap of Faith Family to Family Support
Los Angeles; City of
My Tribe Rise
Pasadenans Organizing for Progress
Public Citizen
Rise Economy
San Gabriel Valley Council of Governments
Sierra Club California
SoCal 350 Climate Action
Sunflower Alliance
Team Palisades
The American Policyholder Association
United Policyholders
West Berkeley Alliance for Clean Air and Safe Jobs
Xtreme Athletics
545 Individuals
OPPOSITION:
American Property Casualty Insurance Association
Civil Justice Association of California
Pacific Association of Domestic Insurance Companies
Personal Insurance Federation of California
-- END --
Bill Author
Bill Co-Author(s):