SB 913: Resource adequacy: aggregated distributed energy resources.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2026-09-30
Current Status:
Passed
(2026-09-30: Chaptered by Secretary of State. Chapter 987, Statutes of 2026.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, in consultation with the Independent System Operator, to establish resource adequacy requirements for all electrical corporations, electric service providers, and community choice aggregators. Existing law requires that the resource adequacy program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified.
This bill would require the PUC, in coordination with the State Energy Resources Conservation and Development Commission and the Independent System Operator, on or before June 30, 2028, to enhance existing market-integrated pathways for aggregated distributed energy resources, as defined, to qualify as resource adequacy capacity, as specified. The bill would require the commission to establish conditions for the use of aggregated distributed energy resources while ensuring net energy metering customers and net billing tariff customers do not receive duplicate compensation, as provided. The bill would require the PUC to allow electrical corporations, electric service providers, and community choice aggregators to include aggregated distributed energy resources in resource adequacy filings and PUC-ordered procurement, as specified. The bill would require the PUC, on or before June 30, 2028, to develop recommendations for changes to the Independent System Operators proxy demand resource and distributed energy resource aggregation participation models to be consistent with the PUCs requirements for aggregated distributed energy resources pursuant to these provisions, and to communicate the recommendations to the Independent System Operator for consideration in a new or existing initiative.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill would be part of the act and a violation of a PUC action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, in consultation with the Independent System Operator, to establish resource adequacy requirements for all electrical corporations, electric service providers, and community choice aggregators. Existing law requires that the resource adequacy program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified.
This bill would require the PUC, in coordination with the State Energy Resources Conservation and Development Commission and the Independent System Operator, on or before June 30, 2028, to enhance existing market-integrated pathways for aggregated distributed energy resources, as defined, to qualify as resource adequacy capacity, as specified. The bill would require the commission to establish conditions for the use of aggregated distributed energy resources while ensuring net energy metering customers and net billing tariff customers do not receive duplicate compensation, as provided. The bill would require the PUC to allow electrical corporations, electric service providers, and community choice aggregators to include aggregated distributed energy resources in resource adequacy filings and PUC-ordered procurement, as specified. The bill would require the PUC, on or before June 30, 2028, to develop recommendations for changes to the Independent System Operators proxy demand resource and distributed energy resource aggregation participation models to be consistent with the PUCs requirements for aggregated distributed energy resources pursuant to these provisions, and to communicate the recommendations to the Independent System Operator for consideration in a new or existing initiative.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill would be part of the act and a violation of a PUC action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, in consultation with the Independent System Operator, to establish resource adequacy requirements for all electrical corporations, electric service providers, and community choice aggregators. Existing law requires that the resource adequacy program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified.
This bill would require the PUC, in coordination with the State Energy Resources Conservation and Development Commission and the Independent System Operator, on or before June 30, 2027, 2028, to enhance existing market-integrated pathways for aggregated distributed energy resources, as defined, to qualify as resource adequacy capacity, as specified. The bill would require the commission to establish conditions for the use of aggregated distributed energy resources while ensuring net energy metering customers and net billing tariff customers do not receive duplicate compensation, as provided. The bill would require the PUC to allow electrical corporations, electric service providers, and community choice aggregators to include aggregated distributed energy resources in resource adequacy filings and PUC-ordered procurement, as specified. The bill would require the PUC, on or before June 30, 2027, 2028, to develop recommendations for changes to the Independent System Operators proxy demand resource and distributed energy resource aggregation participation models to be consistent with the PUCs requirements for aggregated distributed energy resources pursuant to these provisions, and to communicate the recommendations to the Independent System Operator for consideration in a new or existing initiative.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill would be part of the act and a violation of a PUC action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, in consultation with the Independent System Operator, to establish resource adequacy requirements for all electrical corporations, electric service providers, and community choice aggregators. Existing law requires that the resource adequacy program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified.
This bill would require the PUC, in coordination with the State Energy Resources Conservation and Development Commission and the Independent System Operator, on or before June 30, 2027, to enhance existing market-integrated pathways for aggregated distributed capacity energy resources, as defined, to qualify as resource adequacy capacity, as specified. The bill would require the commission to establish conditions for the use of aggregated distributed capacity energy resources while ensuring net energy metering customers and net billing tariff customers do not receive duplicate compensation, as provided. The bill would require the PUC to allow electrical corporations, electric service providers, and community choice aggregators to include aggregated distributed capacity energy resources in resource adequacy filings and PUC-ordered procurement, as specified. The bill would require the PUC, on or before June 30, 2027, to develop recommendations for changes to the Independent System Operators proxy demand resource and the distributed energy resource aggregation participation models to be consistent with the PUCs requirements for aggregated distributed capacity energy resources pursuant to these provisions, and to communicate the recommendations to the Independent System Operator for consideration in a new or existing initiative.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill would be part of the act and a violation of a PUC action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, in consultation with the Independent System Operator, to establish resource adequacy requirements for all electrical corporations, electric service providers, and community choice aggregators. Existing law requires that the resource adequacy program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified.
This bill would require the PUC, in coordination with the State Energy Resources Conservation and Development Commission and the Independent System Operator, on or before June 30, 2027, to enhance existing market-integrated pathways for aggregated distributed capacity resources, as defined, to qualify as resource adequacy capacity, as specified. The bill would require the commission to establish conditions for the use of aggregated distributed capacity resources while ensuring net energy metering customers and net billing tariff customers do not receive duplicate compensation, as provided. The bill would require the PUC to allow electrical corporations, electric service providers, and community choice aggregators to include aggregated distributed capacity resources in resource adequacy filings and PUC-ordered procurement, as specified. The bill would require the PUC, on or before June 30, 2027, to develop recommendations for changes to the Independent System Operators proxy demand resource and the distributed energy resource aggregation participation models to be consistent with the PUCs requirements for aggregated distributed capacity resources pursuant to these provisions, and to request that communicate the recommendations to the Independent System Operator implement these changes for consideration in a new or existing initiative.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill would be part of the act and a violation of a PUC action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, in consultation with the Independent System Operator, to establish resource adequacy requirements for all electrical corporations, electric service providers, and community choice aggregators. Existing law requires that the resource adequacy program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified.
This bill would require the PUC, in coordination with the State Energy Resources Conservation and Development Commission and the Independent System Operator, on or before June 30, 2027, to enhance existing market-integrated pathways for aggregated distributed capacity resources, as defined, to qualify as resource adequacy capacity, as specified. The bill would require the PUC to allow electrical corporations, electric service providers, and community choice aggregators to include aggregated distributed capacity resources in resource adequacy filings and PUC-ordered procurement, as specified. The bill would require the PUC, on or before June 30, 2027, to develop recommendations for changes to the Independent System Operators proxy demand resource and the distributed energy resource aggregation participation models to be consistent with the PUCs requirements for aggregated distributed capacity resources pursuant to these provisions, and to request that the Independent System Operator implement these changes in a new or existing initiative.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill would be part of the act and a violation of a PUC action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, in consultation with the Independent System Operator, to establish resource adequacy requirements for all electrical corporations, electric service providers, and community choice aggregators. Existing law requires that the resource adequacy program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified.
This bill would require the PUC, in coordination with the State Energy Resources Conservation and Development Commission and the Independent System Operator, on or before June 30, 2027, to enhance existing market-integrated pathways for aggregated distributed capacity resources, as defined, to qualify as resource adequacy capacity, as specified. The bill would require the PUC to allow electrical corporations, electric service providers, and community choice aggregators to include aggregated distributed capacity resources in resource adequacy filings and commission-ordered PUC-ordered procurement, as specified. The bill would require the commission, PUC, on or before June 30, 2027, to develop recommendations for changes to the Independent System Operators proxy demand resource and the distributed energy resource aggregation participation models to be consistent with the commissions PUCs requirements for aggregated distributed capacity resources pursuant to these provisions, and to request that the Independent System Operator implement these changes in a new or existing initiative.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill would be part of the act and a violation of a PUC action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, in consultation with the Independent System Operator, to establish resource adequacy requirements for all electrical corporations, electric service providers, and community choice aggregators. Existing law requires that the resource adequacy program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified.
This bill would require the PUC, in coordination with the State Energy Resources Conservation and Development Commission and the Independent System Operator, on or before June 30, 2027, to enhance existing market-integrated pathways for aggregated distributed capacity resources, as defined, to qualify as resource adequacy capacity, as specified. The bill would require the PUC to allow electrical corporations, electric service providers, and community choice aggregators to include aggregated distributed capacity resources in resource adequacy filings and commission-ordered procurement, as specified. The bill would require the commission, on or before June 30, 2027, to develop recommendations for changes to the Independent System Operators proxy demand resource and the distributed energy resource aggregation participation models to be consistent with the commissions requirements for aggregated distributed capacity resources pursuant to these provisions, and to request that the Independent System Operator implement these changes in a new or existing initiative.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill would be part of the act and a violation of a PUC action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, in consultation with the Independent System Operator, to establish resource adequacy requirements for all electrical corporations, electric service providers, and community choice aggregators. Existing law requires that the resource adequacy program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified.
This bill would require the PUC, in coordination with the State Energy Resources Conservation and Development Commission and the Independent System Operator, on or before June 30, 2027, to enhance existing market-integrated pathways for aggregated distributed capacity resources, as defined, to qualify as resource adequacy capacity, as specified. The bill would require the PUC to allow electrical corporations, electric service providers, and community choice aggregators to include aggregated distributed capacity resources in resource adequacy filings and commission-ordered procurement, as specified. The bill would require the commission, on or before June 30, 2027, to develop recommendations for changes to the Independent System Operators proxy demand resource and the distributed energy resource aggregation participation models to be consistent with the commissions requirements for aggregated distributed capacity resources pursuant to these provisions, and to request that the Independent System Operator implement these changes in a new or existing initiative.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill would be part of the act and a violation of a PUC action implementing the bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, until June 30, 2029, authorizes a person proposing an eligible facility, as defined, to submit an application for certification of the site and related facility with the State Energy Resources Conservation and Development Commission. Existing law specifies that the issuance by the commission of the certificate is in lieu of any permit, certificate, or similar document required by any state, local, or regional agency, or federal agency to the extent permitted by federal law, except as provided. Existing law establishes the procedures by which the commission is to review the application.This bill would make nonsubstantive changes to the definitions governing those provisions.Existing law, until June 30, 2029, authorizes a person proposing an eligible facility, as defined, to submit an application for certification of the site and related facility with the State Energy Resources Conservation and Development Commission. Existing law specifies that the issuance by the commission of the certificate is in lieu of any permit, certificate, or similar document required by any state, local, or regional agency, or federal agency to the extent permitted by federal law, except as provided. Existing law establishes the procedures by which the commission is to review the application.
This bill would make nonsubstantive changes to the definitions governing those provisions.
(a)The Legislature finds and declares all of the following:
(1)California faces increasing peak and net peak electricity demand due to continued growth and extreme temperatures.
(2)Distributed energy resources can provide reliable, cost-effective dispatchable capacity that reduces the need for new fossil-fueled generation.
(3)When distributed energy resources are dispatched instead of fossil-fueled generation, it reduces greenhouse gas emissions in furtherance of the states climate targets and it reduces air pollution in the communities adjacent to the generation facilities that would otherwise have been dispatched.
(4)The amount of demand response participating in resource adequacy has declined in recent years even though there are many more distributed energy resources today that could be available to support the electrical grid.
(5)The Independent System Operator is actively pursuing reforms through its demand and distributed energy market integration initiative to improve participation models for distributed energy resources, including the proxy demand resource and the distributed energy resource participation models.
(6)Coordination among the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, and the Independent System Operator is necessary to establish a durable, transparent, and timely pathway for more distributed energy resources to qualify for resource adequacy.
(b)It is the intent of the Legislature to address barriers for distributed energy resources to qualify for resource adequacy capacity so that distributed energy resources can more easily be used, where cost effective, to meet electrical grid reliability standards while lowering costs for ratepayers, supporting decarbonization goals, and reducing air pollution.
SEC. 2.Section 380.1 is added to the Public Utilities Code, to read:380.1.(a)On or before June 30, 2028, the commission, in coordination with the Energy Commission and the Independent System Operator, shall enhance existing market-integrated pathways for aggregated distributed energy resources to qualify as resource adequacy capacity, including by ensuring all of the following:
(1)Aggregated distributed energy resources are able to qualify for local, system, or flexible resource adequacy capacity within any qualifying capacity or successor methodology adopted by the commission, if the aggregated distributed energy resource meets all qualifying criteria.
(2)Aggregated distributed energy resources are eligible to receive resource adequacy credit for their qualifying capacity value, including energy exported past the utility meter to the extent authorized pursuant to subdivision (b).
(3)(A)The commission shall determine the extent to which device-level telemetry may provide accurate measurement of net load impact delivered to the grid in response to a dispatch signal from the grid operator.
(B)The commission shall develop reasonable and standardized requirements, which may include metering accuracy, data integrity, telemetry resolution and latency, settlement verification, interoperability across devices and aggregators, and fraud or tamper prevention, to allow distributed resources within an aggregated distributed energy resource that meet those requirements to be settled using device-level telemetry, if the commission has determined pursuant to subparagraph (A) that device-level telemetry provides sufficient and accurate measurements.
(4)Qualifying capacity methodologies credit load reductions and net exports of energy during the specific hour of the day required for resource adequacy showings, fully integrate these resources into the current resource adequacy construct and counting conventions, and allow aggregated distributed energy resources to combine different types of distributed resources and technologies.
(5)Multiple enrollment is authorized, allowing multiple devices to participate behind the same utility point of interconnection, including in separate programs, if there is no double counting or duplicate compensation for the same load reduction or energy export. The commission shall establish, through existing or new proceedings, requirements to implement and enforce this paragraph.
(6)Consumer data privacy is protected consistent with state law and commission decisions.
(7)Enrollment processes reduce the barriers to enrolling distributed resources as aggregated distributed energy resources.
(8)To the extent feasible, all capacity determinations are technology neutral, based on measured performance, and weather normalized, allowing the broadest set of device types and technologies to be included within an aggregated distributed energy resource and putting the burden on the aggregated distributed energy resource provider to ensure that it can deliver, in total across all of its distributed resources, the promised demand reduction or electricity supply when called upon.
(9)Alignment with the Independent System Operators existing market participation models for aggregated distributed energy resources, as modified pursuant to subdivision (e).
(b)The commission shall establish conditions under which customer-sited distributed resources may receive capacity credit for energy exported past the utility meter as part of an aggregated distributed energy resource with the goal of maximizing the availability of customer-sited distributed resources to provide benefits to the grid while ensuring that net energy metering customers and net billing tariff customers receiving service pursuant to Section 2827, 2827.1, or 2827.10 do not receive duplicate compensation, through both the aggregated distributed energy resource and the retail bill credits, for energy exported in response to a dispatch through the aggregated distributed energy resource.
(c)The commission shall allow load-serving entities to include aggregated distributed energy resources in resource adequacy filings and commission-ordered procurement pursuant to Section 454.54, consistent with the loading order in the states energy action plan, if the aggregated distributed energy resource meets the energy attribute requirements specified in the applicable procurement order or resource adequacy requirements.
(d)On or before June 30, 2028, the commission shall develop recommendations for changes to the Independent System Operators proxy demand resource and distributed energy resource aggregation participation models, including the must-offer obligation for each participation model, to be consistent with the commissions requirements for aggregated distributed energy resources pursuant to this section, and shall communicate the recommendations to the Independent System Operator for consideration in a new or existing initiative.
(e)For purposes of this section, all of the following definitions apply:
(1)Aggregated distributed energy resource means an aggregation of more than one distributed resource that is capable of supplying electricity to, or reducing electricity demand on, the electrical distribution system when called upon to do so.
(2)Distributed resources has the same meaning as defined in Section 769.
(3)Load-serving entity has the same meaning as defined in Section 380.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)California faces increasing peak and net peak electricity demand due to continued growth and extreme temperatures.
(2)Distributed energy resources can provide reliable, cost-effective dispatchable capacity that reduces the need for new fossil-fueled generation.
(3)When distributed energy resources are dispatched instead of fossil-fueled generation, it reduces greenhouse gas emissions in furtherance of the states climate targets and it reduces air pollution in the communities adjacent to the generation facilities that would otherwise have been dispatched.
(4)The amount of demand response participating in resource adequacy has declined in recent years even though there are many more distributed energy resources today that could be available to support the electrical grid.
(5)The Independent System Operator is actively pursuing reforms through its demand and distributed energy market integration initiative to improve participation models for distributed energy resources, including the proxy demand resource and the distributed energy resource participation models.
(6)Coordination among the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, and the Independent System Operator is necessary to establish a durable, transparent, and timely pathway for more distributed energy resources to qualify for resource adequacy.
(b)It is the intent of the Legislature to address barriers for distributed energy resources to qualify for resource adequacy capacity so that distributed energy resources can more easily be used, where cost effective, to meet electrical grid reliability standards while lowering costs for ratepayers, supporting decarbonization goals, and reducing air pollution.
SEC. 2.Section 380.1 is added to the Public Utilities Code, to read:380.1.(a)On or before June 30, 2028, the commission, in coordination with the Energy Commission and the Independent System Operator, shall enhance existing market-integrated pathways for aggregated distributed energy resources to qualify as resource adequacy capacity, including by ensuring all of the following:
(1)Aggregated distributed energy resources are able to qualify for local, system, or flexible resource adequacy capacity within any qualifying capacity or successor methodology adopted by the commission, if the aggregated distributed energy resource meets all qualifying criteria.
(2)Aggregated distributed energy resources are eligible to receive resource adequacy credit for their qualifying capacity value, including energy exported past the utility meter to the extent authorized pursuant to subdivision (b).
(3)(A)The commission shall determine the extent to which device-level telemetry may provide accurate measurement of net load impact delivered to the grid in response to a dispatch signal from the grid operator.
(B)The commission shall develop reasonable and standardized requirements, which may include metering accuracy, data integrity, telemetry resolution and latency, settlement verification, interoperability across devices and aggregators, and fraud or tamper prevention, to allow distributed resources within an aggregated distributed energy resource that meet those requirements to be settled using device-level telemetry, if the commission has determined pursuant to subparagraph (A) that device-level telemetry provides sufficient and accurate measurements.
(4)Qualifying capacity methodologies credit load reductions and net exports of energy during the specific hour of the day required for resource adequacy showings, fully integrate these resources into the current resource adequacy construct and counting conventions, and allow aggregated distributed energy resources to combine different types of distributed resources and technologies.
(5)Multiple enrollment is authorized, allowing multiple devices to participate behind the same utility point of interconnection, including in separate programs, if there is no double counting or duplicate compensation for the same load reduction or energy export. The commission shall establish, through existing or new proceedings, requirements to implement and enforce this paragraph.
(6)Consumer data privacy is protected consistent with state law and commission decisions.
(7)Enrollment processes reduce the barriers to enrolling distributed resources as aggregated distributed energy resources.
(8)To the extent feasible, all capacity determinations are technology neutral, based on measured performance, and weather normalized, allowing the broadest set of device types and technologies to be included within an aggregated distributed energy resource and putting the burden on the aggregated distributed energy resource provider to ensure that it can deliver, in total across all of its distributed resources, the promised demand reduction or electricity supply when called upon.
(9)Alignment with the Independent System Operators existing market participation models for aggregated distributed energy resources, as modified pursuant to subdivision (e).
(b)The commission shall establish conditions under which customer-sited distributed resources may receive capacity credit for energy exported past the utility meter as part of an aggregated distributed energy resource with the goal of maximizing the availability of customer-sited distributed resources to provide benefits to the grid while ensuring that net energy metering customers and net billing tariff customers receiving service pursuant to Section 2827, 2827.1, or 2827.10 do not receive duplicate compensation, through both the aggregated distributed energy resource and the retail bill credits, for energy exported in response to a dispatch through the aggregated distributed energy resource.
(c)The commission shall allow load-serving entities to include aggregated distributed energy resources in resource adequacy filings and commission-ordered procurement pursuant to Section 454.54, consistent with the loading order in the states energy action plan, if the aggregated distributed energy resource meets the energy attribute requirements specified in the applicable procurement order or resource adequacy requirements.
(d)On or before June 30, 2028, the commission shall develop recommendations for changes to the Independent System Operators proxy demand resource and distributed energy resource aggregation participation models, including the must-offer obligation for each participation model, to be consistent with the commissions requirements for aggregated distributed energy resources pursuant to this section, and shall communicate the recommendations to the Independent System Operator for consideration in a new or existing initiative.
(e)For purposes of this section, all of the following definitions apply:
(1)Aggregated distributed energy resource means an aggregation of more than one distributed resource that is capable of supplying electricity to, or reducing electricity demand on, the electrical distribution system when called upon to do so.
(2)Distributed resources has the same meaning as defined in Section 769.
(3)Load-serving entity has the same meaning as defined in Section 380.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)California faces increasing peak and net peak electricity demand due to continued growth and extreme temperatures.
(2)Distributed energy resources can provide reliable, cost-effective dispatchable capacity that reduces the need for new fossil-fueled generation.
(3)When distributed energy resources are dispatched instead of fossil-fueled generation, it reduces greenhouse gas emissions in furtherance of the states climate targets and it reduces air pollution in the communities adjacent to the generation facilities that would otherwise have been dispatched.
(4)The amount of demand response participating in resource adequacy has declined in recent years even though there are many more distributed energy resources today that could be available to support the electrical grid.
(5)The Independent System Operator is actively pursuing reforms through its demand and distributed energy market integration initiative to improve participation models for distributed energy resources, including the proxy demand resource and the distributed energy resource participation models.
(6)Coordination among the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, and the Independent System Operator is necessary to establish a durable, transparent, and timely pathway for more distributed energy resources to qualify for resource adequacy.
(b)It is the intent of the Legislature to address barriers for distributed energy resources to qualify for resource adequacy capacity so that distributed energy resources can more easily be used, where cost effective, to meet electrical grid reliability standards while lowering costs for ratepayers, supporting decarbonization goals, and reducing air pollution.
SEC. 2.Section 380.1 is added to the Public Utilities Code, to read:380.1.(a)On or before June 30, 2027, 2028, the commission, in coordination with the Energy Commission and the Independent System Operator, shall enhance existing market-integrated pathways for aggregated distributed energy resources to qualify as resource adequacy capacity, including by ensuring all of the following:
(1)Aggregated distributed energy resources are able to qualify for local, system, or flexible resource adequacy capacity within any qualifying capacity or successor methodology adopted by the commission, if the aggregated distributed energy resource meets all qualifying criteria.
(2)Aggregated distributed energy resources are eligible to receive resource adequacy credit for their qualifying capacity value, including energy exported past the utility meter to the extent authorized pursuant to subdivision (b).
(3)To the extent the commission determines (A)The commission shall determine the extent to which device-level telemetry may provide accurate measurement of net load impact delivered to the grid in response to a dispatch signal from the grid operator, development of reasonable operator.
(B)The commission shall develop reasonable and standardized requirements, which may include metering accuracy, data integrity, telemetry resolution and latency, settlement verification, interoperability across devices and aggregators, and fraud or tamper prevention, to allow distributed resources within an aggregated distributed energy resource that meet those requirements to be settled using device telemetry. device-level telemetry, if the commission has determined pursuant to subparagraph (A) that device-level telemetry provides sufficient and accurate measurements.
(4)Qualifying capacity methodologies credit load reductions and net exports of energy during the specific hour of the day required for resource adequacy showings, fully integrate these resources into the current resource adequacy construct and counting conventions, and allow aggregated distributed energy resources to combine different types of distributed resources and technologies.
(5)Multiple enrollment is authorized, allowing multiple devices to participate behind the same utility point of interconnection, including in separate programs, if there is no double counting or duplicate compensation for the same load reduction or energy export. The commission shall establish, through existing or new proceedings, requirements to implement and enforce this paragraph.
(6)Consumer data privacy is protected consistent with state law and commission decisions.
(7)Enrollment processes reduce the barriers to enrolling distributed resources as aggregated distributed energy resources.
(8)To the extent feasible, all capacity determinations are technology neutral, based on measured performance, and weather normalized, allowing the broadest set of device types and technologies to be included within an aggregated distributed energy resource and putting the burden on the aggregated distributed energy resource provider to ensure that it can deliver, in total across all of its distributed resources, the promised demand reduction or electricity supply when called upon.
(9)Alignment with the Independent System Operators existing market participation models for aggregated distributed energy resources, as modified pursuant to subdivision (e).
(b)The commission shall establish conditions under which customer-sited distributed resources may cause receive capacity credit for energy to be exported past the utility meter as part of an aggregated distributed energy resource with the goal of maximizing the availability of customer-sited distributed resources to provide benefits to the grid while ensuring that net energy metering customers and net billing tariff customers receiving service pursuant to Section 2827, 2827.1, or 2827.10 do not receive duplicate compensation compensation, through both the aggregated distributed energy resource and the retail bill credits credits, for energy exported in response to a dispatch through the aggregated distributed energy resource.
(c)The commission shall allow load-serving entities to include aggregated distributed energy resources in resource adequacy filings and commission-ordered procurement pursuant to Section 454.54, consistent with the loading order in the states energy action plan, if the aggregated distributed energy resource meets the energy attribute requirements specified in the applicable procurement order or resource adequacy requirements.
(d)In adopting rules for aggregated distributed energy resources to qualify for new resource procurement or to participate in the resource adequacy program, the commission shall ensure both of the following:(1)Resource procurement requirements provide reasonable flexibility to accommodate the differing characteristics of resource types, including aggregated distributed energy resources, to broaden the set of resources that can compete to meet the states procurement or resource adequacy needs at the lowest cost to ratepayers, except that an aggregated distributed energy resource shall not be eligible to participate unless it demonstrates it can deliver the specific energy attributes, including capacity, location, dispatchability, or other characteristics, required under the applicable procurement order or resource adequacy requirements.(2)Procurement requirements do not prevent entities that are not load-serving entities from developing and managing aggregated distributed energy resources, including through limitations on enrollment authorization, and offering those resources for resource adequacy capacity or other procurement.(e)(d)On or before June 30, 2027, 2028, the commission shall develop recommendations for changes to the Independent System Operators proxy demand resource and distributed energy resource aggregation participation models, including the must-offer obligation for each participation model, to be consistent with the commissions requirements for aggregated distributed energy resources pursuant to this section, and shall communicate the recommendations to the Independent System Operator for consideration in a new or existing initiative.
(f)(e)For purposes of this section, all of the following definitions apply:
(1)Aggregated distributed energy resource means an aggregation of more than one distributed resource that is capable of supplying electricity to, or reducing electricity demand on, the electrical distribution system when called upon to do so. For purposes of this section, distributed resources shall not include those participating in a net metering tariff pursuant to Sections 2827 and 2827.10.
(2)Distributed resources has the same meaning as defined in Section 769.
(3)Load-serving entity has the same meaning as defined in Section 380.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)California faces increasing peak and net peak electricity demand due to continued growth and extreme temperatures during summer and winter months. temperatures.
(2)Distributed energy resources can provide reliable, cost-effective dispatchable capacity that reduces the need for new fossil-fueled generation.
(3)When distributed energy resources are dispatched instead of fossil-fueled generation, it reduces greenhouse gas emissions in furtherance of the states climate targets and it reduces air pollution in the communities adjacent to the generation facilities that would otherwise have been dispatched.
(4)During recent summer reliability events, distributed energy resources delivered verifiable performance to support electrical grid stability. However, these resources ability to provide capacity is limited by current market and regulatory rules and, therefore, they may not be receiving the full resource adequacy capacity value that they could provide.(5)Unfortunately, the(4)The amount of demand response participating in resource adequacy has declined in recent years even though there are many more distributed energy resources today that could be available to support the electrical grid.
(6)(5)The Independent System Operator is actively pursuing reforms through its demand and distributed energy market integration initiative to improve participation models for distributed energy resources, including the proxy demand resource and the distributed energy resource participation models.
(7)(6)Coordination among the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, and the Independent System Operator is necessary to establish a durable, transparent, and timely pathway for more distributed energy resources to qualify for resource adequacy.
(b)It is the intent of the Legislature to address barriers that have unnecessarily limited the ability for distributed energy resources to qualify for resource adequacy capacity so that distributed energy resources can more easily be used, where cost effective, to meet electrical grid reliability standards while lowering costs for ratepayers, supporting decarbonization goals, and reducing air pollution.
SEC. 2.Section 380.1 is added to the Public Utilities Code, to read:380.1.(a)On or before June 30, 2027, the commission, in coordination with the Energy Commission and the Independent System Operator, shall enhance existing market-integrated pathways for aggregated distributed capacity energy resources to qualify as resource adequacy capacity, including by ensuring all of the following:
(1)Aggregated distributed capacity energy resources are able to qualify for local, system, or flexible resource adequacy capacity within any qualifying capacity or successor methodology adopted by the commission. commission, if the aggregated distributed energy resource meets all qualifying criteria.
(2)Aggregated distributed capacity energy resources are eligible to receive resource adequacy credit for full their qualifying capacity value, including energy exported past the utility meter to the extent authorized pursuant to subdivision (b).
(3)Reasonable To the extent the commission determines device-level telemetry may provide accurate measurement of net load impact delivered to the grid in response to a dispatch signal from the grid operator, development of reasonable and standardized requirements, which may include metering accuracy, data integrity, telemetry resolution and latency, settlement verification, interoperability across devices and aggregators, and fraud or tamper prevention, allow distributed resources within an aggregated distributed capacity energy resource that meet those requirements to be settled using device telemetry without the need for a revenue-grade meter. telemetry.(4)Qualifying capacity methodologies are consistent with the device-level measurement provisions of this section, credit both load reductions and net exports of energy during any the specific hour of the day, day required for resource adequacy showings, fully integrate these resources into the current resource adequacy construct and counting conventions, and allow aggregated distributed capacity energy resources to combine different types of distributed resources and technologies.
(5)Multiple enrollment is authorized, allowing multiple devices to participate behind the same utility point of interconnection, including in separate programs, if there is no double counting or duplicate compensation for the same load reduction or energy export.
(6)Consumer data privacy is protected consistent with state law and enrollment commission decisions.
(7)Enrollment processes follow industry best practices, including those adopted for the Demand Side Grid Support Program 2025 season pursuant to Section 25792 of the Public Resources Code, in order to reduce the barriers to enrolling distributed resources as aggregated distributed capacity energy resources.
(7)(8)To the extent feasible, all capacity determinations are technology neutral, based on measured performance, and weather normalized, allowing the broadest set of device types and technologies to be included within an aggregated distributed capacity energy resource and putting the burden on the aggregated distributed capacity energy resource provider to ensure that it can deliver, in total across all of its distributed resources, the promised demand reduction or electricity supply when called upon.
(8)(9)Alignment with the Independent System Operators existing market participation models for aggregated distributed capacity energy resources, as modified pursuant to subdivision (e).
(b)The commission shall establish conditions under which customer-sited distributed resources may cause energy to be exported past the utility meter as part of an aggregated distributed capacity energy resource with the goal of maximizing the availability of customer-sited distributed resources to provide benefits to the grid while ensuring that net energy metering customers and net billing tariff customers receiving service pursuant to Section 2827, 2827.1, or 2827.10 do not receive duplicate compensation through both the aggregated distributed capacity energy resource and the retail bill credits for energy exported in response to a dispatch through the aggregated distributed capacity energy resource.
(c)The commission shall allow load-serving entities to include aggregated distributed capacity energy resources in resource adequacy filings and commission-ordered procurement pursuant to Section 454.54, consistent with the loading order in the states energy action plan. plan, if the aggregated distributed energy resource meets the energy attribute requirements specified in the applicable procurement order or resource adequacy requirements.
(d)In adopting rules for aggregated distributed capacity energy resources to qualify for new resource procurement or to participate in the resource adequacy program, the commission shall ensure both of the following:
(1)Resource procurement requirements provide reasonable flexibility to accommodate the differing characteristics of resource types, including aggregated distributed capacity energy resources, to broaden the set of resources that can compete to meet the states procurement or resource adequacy needs at the lowest cost to ratepayers. ratepayers, except that an aggregated distributed energy resource shall not be eligible to participate unless it demonstrates it can deliver the specific energy attributes, including capacity, location, dispatchability, or other characteristics, required under the applicable procurement order or resource adequacy requirements.
(2)Procurement requirements do not prevent entities that are not load-serving entities from developing and managing aggregated distributed capacity energy resources, including through limitations on enrollment authorization, and offering those resources for resource adequacy capacity or other procurement.
(e)On or before June 30, 2027, the commission shall develop recommendations for changes to the Independent System Operators proxy demand resource and the distributed energy resource aggregation participation models, including the must-offer obligation for each participation model, to be consistent with the commissions requirements for aggregated distributed capacity energy resources pursuant to this section, and shall communicate the recommendations to the Independent System Operator for consideration in a new or existing initiative.
(f)For purposes of this section, all of the following definitions apply:
(1)Aggregated distributed capacity energy resource means an aggregation of one or more than one distributed resources resource that are is capable of supplying electricity to, or reducing electricity demand on, the electrical distribution system when called upon to do so. For purposes of this section, distributed resources shall not include those participating in a net metering tariff pursuant to Sections 2827 and 2827.10.
(2)Distributed resources has the same meaning as defined in Section 769.
(3)Load-serving entity has the same meaning as defined in Section 380.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)California faces increasing peak and net peak electricity demand due to continued growth and extreme temperatures during summer and winter months.
(2)Distributed energy resources can provide reliable, cost-effective dispatchable capacity that reduces the need for new fossil-fueled generation.
(3)When distributed energy resources are dispatched instead of fossil-fueled generation, it reduces greenhouse gas emissions in furtherance of the states climate targets and it reduces air pollution in the communities adjacent to the generation facilities that would otherwise have been dispatched.
(4)During recent summer reliability events, distributed energy resources delivered verifiable performance to support electrical grid stability. However, these resources ability to provide capacity is undervalued because, under limited by current market and regulatory rules, they do not receive rules and, therefore, they may not be receiving the full resource adequacy capacity value that they could provide.
(5)Unfortunately, the amount of demand response participating in resource adequacy has dramatically declined in recent years even though there are many more distributed energy resources today that could be available to support the electrical grid.
(6)The Independent System Operator is actively pursuing reforms through its demand and distributed energy market integration initiative to improve participation models for distributed energy resources, including the proxy demand resource and the distributed energy resource participation models.
(7)Coordination among the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, and the Independent System Operator is necessary to establish a durable, transparent, and timely pathway for more distributed energy resources to qualify for resource adequacy.
(b)It is the intent of the Legislature to address barriers that have unnecessarily limited the ability for distributed energy resources to qualify for resource adequacy capacity so that distributed energy resources can more easily be used, where cost effective, to meet electrical grid reliability standards while lowering costs for ratepayers, supporting decarbonization goals, and reducing air pollution.
SEC. 2.Section 380.1 is added to the Public Utilities Code, to read:380.1.(a)On or before June 30, 2027, the commission, in coordination with the Energy Commission and the Independent System Operator, shall enhance existing market-integrated pathways for aggregated distributed capacity resources to qualify as resource adequacy capacity, including by ensuring all of the following:
(1)Aggregated distributed capacity resources are able to qualify for local, system, or flexible resource adequacy capacity within any qualifying capacity or successor methodology adopted by the commission.
(2)Aggregate Aggregated distributed capacity resources are eligible to receive resource adequacy credit for full capacity value, including energy exported past the utility meter. meter to the extent authorized pursuant to subdivision (b).
(3)Reasonable and standardized requirements requirements, which may include metering accuracy, data integrity, telemetry resolution and latency, settlement verification, interoperability across devices and aggregators, and fraud or tamper prevention, allow distributed resources within an aggregated distributed capacity resource that meet those requirements to be settled using device telemetry without the need for a revenue-grade meter.(4)Qualifying capacity methodologies are consistent with the device-level measurement provisions of this section, credit both load reductions and net exports of energy during any hour of the day, fully integrate these resources into the current resource adequacy construct and counting conventions, and allow aggregated distributed capacity resources to combine different types of distributed resources and technologies.(5)Multiple enrollment is authorized, allowing multiple devices to participate behind the same utility point of interconnection, including in separate programs, if there is no duplicate compensation for the same load reduction or energy export.(6)Consumer data privacy is protected consistent with state law and enrollment processes follow industry best practices, including those adopted for the Demand Side Grid Support Program 2025 season pursuant to Section 25792 of the Public Resources Code, in order to reduce the barriers to enrolling distributed resources as aggregated distributed capacity resources.(7)To the extent feasible, all capacity determinations are technology neutral, based on measured performance, and weather normalized, allowing the broadest set of device types and technologies to be included within an aggregated distributed capacity resource and putting the burden on the aggregated distributed capacity resource provider to ensure that it can deliver, in total across all of its distributed resources, the promised demand reduction or electricity supply when called upon.(8)Alignment with the Independent System Operators existing market participation models for aggregated distributed capacity resources, as modified pursuant to subdivision (d). (e).
(b)The commission shall establish conditions under which customer-sited distributed resources may cause energy to be exported past the utility meter as part of an aggregated distributed capacity resource with the goal of maximizing the availability of customer-sited distributed resources to provide benefits to the grid while ensuring that net energy metering customers and net billing tariff customers receiving service pursuant to Section 2827, 2827.1, or 2827.10 do not receive duplicate compensation through both the aggregated distributed capacity resource and the retail bill credits for energy exported in response to a dispatch through the aggregated distributed capacity resource.
(b)(c)The commission shall allow load-serving entities to include aggregated distributed capacity resources in resource adequacy filings and commission-ordered procurement pursuant to Section 454.54, consistent with the loading order in the states energy action plan.
(c)(d)In adopting rules for aggregated distributed capacity resources to qualify for new resource procurement or to participate in the resource adequacy program, the commission shall ensure both of the following:
(1)Requirements for procurement or resource adequacy, including contract terms, shall not prevent load-serving entities from contracting with aggregated distributed capacity resources in favor of other types of resources lower in the loading order in the states energy action plan, except to the extent necessary to implement procurement of eligible resources with specific attributes that cannot be met by aggregated distributed capacity resources, such as providing clean firm generation or multiday energy storage. To the extent feasible, the commission shall Resource procurement requirements provide reasonable flexibility in procurement requirements to accommodate the differing characteristics of resource types, including aggregated distributed capacity resources, to broaden the set of resources that can compete to meet the states procurement or resource adequacy needs at the lowest cost to ratepayers.
(2)Requirements shall Procurement requirements do not prevent entities that are not load-serving entities from developing and managing aggregated distributed capacity resources, including through limitations on enrollment authorization, and offering those resources for resource adequacy capacity or other procurement.
(d)(e)On or before June 30, 2027, the commission shall develop recommendations for changes to the Independent System Operators proxy demand resource and the distributed energy resource aggregation participation models, including the must-offer obligation for each participation model, to be consistent with the commissions requirements for aggregated distributed capacity resources pursuant to this section, and shall request that communicate the recommendations to the Independent System Operator implement these changes for consideration in a new or existing initiative.
(e)(f)For purposes of this section, both all of the following definitions apply:
(1)Aggregated distributed capacity resource means an aggregation of one or more distributed resources, as defined in Section 769, resources that are capable of supplying electricity to, or reducing electricity demand on, the electrical distribution system when called upon to do so. For purposes of this section, distributed resources shall not include those participating in a net metering tariff pursuant to Sections 2827 and 2827.10.
(2)Distributed resources has the same meaning as defined in Section 769.
(2)(3)Load-serving entity has the same meaning as defined in Section 380.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)California faces increasing peak and net peak electricity demand due to continued growth and extreme temperatures during summer and winter months.
(2)Distributed energy resources can provide reliable, cost-effective dispatchable capacity that reduces the need for new fossil-fueled generation.
(3)When distributed energy resources are dispatched instead of fossil-fueled generation, it reduces greenhouse gas emissions in furtherance of the states climate targets and it reduces air pollution in the communities adjacent to the generation facilities that would otherwise have been dispatched.
(4)During recent summer reliability events, distributed energy resources delivered verifiable performance to support electrical grid stability. However, these resources ability to provide capacity is undervalued because, under current market and regulatory rules, they do not receive the full resource adequacy capacity value that they could provide.
(5)Unfortunately, the amount of demand response participating in resource adequacy has dramatically declined in recent years even though there are many more distributed energy resources today that could be available to support the electrical grid.
(6)The Independent System Operator is actively pursuing reforms through its demand and distributed energy market integration initiative to improve participation models for distributed energy resources, including the proxy demand resource and the distributed energy resource participation models.
(7)Coordination among the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, and the Independent System Operator is necessary to establish a durable, transparent, and timely pathway for more distributed energy resources to qualify for resource adequacy.
(b)It is the intent of the Legislature to address barriers that have unnecessarily limited the ability for distributed energy resources to qualify for resource adequacy capacity so that distributed energy resources can more easily be used, where cost effective, to meet electrical grid reliability standards while lowering costs for ratepayers, supporting decarbonization goals, and reducing air pollution.
SEC. 2.Section 380.1 is added to the Public Utilities Code, to read:380.1.(a)On or before June 30, 2027, the commission, in coordination with the Energy Commission and the Independent System Operator, shall enhance existing market-integrated pathways for aggregated distributed capacity resources to qualify as resource adequacy capacity, including by ensuring all of the following:
(1)Aggregated distributed capacity resources are able to qualify for local, system, or flexible resource adequacy capacity within any qualifying capacity or successor methodology adopted by the commission.
(2)Aggregate distributed capacity resources are eligible to receive resource adequacy credit for full capacity value, including energy exported past the utility meter.
(3)Reasonable and standardized requirements allow distributed resources within an aggregated distributed capacity resource that meet those requirements to be settled using device telemetry without the need for a revenue-grade meter.
(4)Qualifying capacity methodologies are consistent with the device-level measurement provisions of this section, credit both load reductions and net exports of energy during any hour of the day, fully integrate these resources into the current resource adequacy construct and counting conventions, and allow aggregated distributed capacity resources to combine different types of distributed resources and technologies.
(5)Multiple enrollment is authorized, allowing multiple devices to participate behind the same utility point of interconnection, including in separate programs, if there is no duplicate compensation for the same load reduction or energy export.
(6)Consumer data privacy is protected consistent with state law and enrollment processes follow industry best practices, including those adopted for the Demand Side Grid Support Program created 2025 season pursuant to Section 25792 of the Public Resources Code, in order to reduce the barriers to enrolling distributed resources as aggregated distributed capacity resources.
(7)To the extent feasible, all capacity determinations are technology neutral, based on measured performance, and weather normalized, allowing the broadest set of device types and technologies to be included within an aggregated distributed capacity resource and putting the burden on the aggregated distributed capacity resource provider to ensure that it can deliver, in total across all of its distributed resources, the promised demand reduction or electricity supply when called upon.
(8)Alignment with the Independent System Operators existing market participation models for aggregated distributed capacity resources, as modified pursuant to subdivision (d).
(b)The commission shall allow load-serving entities to include aggregated distributed capacity resources in resource adequacy filings and commission-ordered procurement pursuant to Section 454.54, consistent with the loading order in the states energy action plan.
(c)In adopting rules for aggregated distributed capacity resources to qualify for new resource procurement or to participate in the resource adequacy program, the commission shall ensure both of the following:
(1)Requirements for procurement or resource adequacy, including contract terms, shall not prevent load-serving entities from contracting with aggregated distributed capacity resources in favor of other types of resources lower in the loading order in the states energy action plan, except to the extent necessary to implement procurement of eligible resources with specific attributes that cannot be met by aggregated distributed capacity resources, such as providing clean firm generation or multiday energy storage. To the extent feasible, the commission shall provide reasonable flexibility in procurement requirements to accommodate the differing characteristics of resource types, including aggregated distributed capacity resources, to broaden the set of resources that can compete to meet the states procurement or resource adequacy needs at the lowest cost to ratepayers.
(2)Requirements shall not prevent entities that are not load-serving entities from developing and managing aggregated distributed capacity resources, including through limitations on enrollment authorization, and offering those resources for resource adequacy capacity or other procurement.
(d)On or before June 30, 2027, the commission shall develop recommendations for changes to the Independent System Operators proxy demand resource and the distributed energy resource aggregation participation models, including the must-offer obligation for each participation model, to be consistent with the commissions requirements for aggregated distributed capacity resources pursuant to this section, and shall request that the Independent System Operator implement these changes in a new or existing initiative.
(e)For purposes of this section, both of the following definitions apply:
(1)Aggregated distributed capacity resource means an aggregation of one or more distributed resources, as defined in Section 769, that are capable of supplying electricity to, or reducing electricity demand on, the electrical distribution system when called upon to do so. For purposes of this section, distributed resources shall not include those participating in a net metering tariff pursuant to Sections 2827 and 2827.10.
(2)Load-serving entity has the same meaning as defined in Section 380.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)California faces increasing peak and net peak electricity demand due to continued growth and extreme temperatures during summer and winter months.
(2)Distributed energy resources can provide reliable, cost-effective dispatchable capacity that reduces the need for new fossil-fueled generation.
(3)When distributed energy resources are dispatched instead of fossil-fueled generation, it reduces greenhouse gas emissions in furtherance of the states climate targets and it reduces air pollution in the communities adjacent to the generation facilities that would otherwise have been dispatched.
(4)During recent summer reliability events, distributed energy resources delivered verifiable performance to support electrical grid stability. However, these resources ability to provide capacity is undervalued because, under current market and regulatory rules, they do not receive the full resource adequacy capacity value that they could provide.
(5)Unfortunately, the amount of demand response participating in resource adequacy has dramatically declined in recent years even though there are many more distributed energy resources today that could be available to support the electrical grid.
(6)The Independent System Operator is actively pursuing reforms through its demand and distributed energy market integration initiative to improve participation models for distributed energy resources, including the proxy demand resource and the distributed energy resource participation models.
(7)Coordination among the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, and the Independent System Operator is necessary to establish a durable, transparent, and timely pathway for more distributed energy resources to qualify for resource adequacy.
(b)It is the intent of the Legislature to address barriers that have unnecessarily limited the ability for distributed energy resources to qualify for resource adequacy capacity so that distributed energy resources can more easily be used, where cost effective, to meet electrical grid reliability standards while lowering costs for ratepayers, supporting decarbonization goals, and reducing air pollution.
SEC. 2.Section 380.1 is added to the Public Utilities Code, to read:380.1.(a)On or before June 30, 2027, the commission, in coordination with the Energy Commission and the Independent System Operator, shall enhance existing market-integrated pathways for aggregated distributed capacity resources to qualify as resource adequacy capacity, including by ensuring all of the following:
(1)Aggregated distributed capacity resources are able to qualify for local, system, or flexible resource adequacy capacity within any qualifying capacity or successor methodology adopted by the commission.
(2)Aggregate distributed capacity resources are eligible to receive resource adequacy credit for full capacity value, including energy exported past the utility meter.
(3)Reasonable and standardized requirements allow distributed resources within an aggregated distributed capacity resource that meet those requirements to be settled using device telemetry without the need for a revenue-grade meter.
(4)Qualifying capacity methodologies are consistent with the device-level measurement provisions of this section, credit both load reductions and net exports of energy during any hour of the day, fully integrate these resources into the current resource adequacy construct and counting conventions, and allow aggregated distributed capacity resources to combine different types of distributed resources and technologies.
(5)Multiple enrollment is authorized, allowing multiple devices to participate behind the same utility point of interconnection, including in separate programs, if there is no duplicate compensation for the same load reduction or energy export.
(6)Consumer data privacy is protected without unduly burdensome requirements on aggregated distributed capacity resource providers for enrollment and energy usage data access, such as requiring utility login, meter-level data sharing authorization, or other requirements that would limit the growth of aggregated distributed capacity resources, unless there is a clear statutory requirement or a clear and compelling need for the privacy requirements. To the extent feasible, the commission shall allow the use of opt-out enrollment structures and streamlined data access authorization processes to reduce the barriers to enrolling distributed resources into aggregated distributed capacity resources. consistent with state law and enrollment processes follow industry best practices, including those adopted for the Demand Side Grid Support Program created pursuant to Section 25792 of the Public Resources Code, in order to reduce the barriers to enrolling distributed resources as aggregated distributed capacity resources.
(7)To the extent feasible, all capacity determinations are technology neutral, based on measured performance, and weather normalized, allowing the broadest set of device types and technologies to be included within an aggregated distributed capacity resource and putting the burden on the aggregated distributed capacity resource provider to ensure that it can deliver, in total across all of its distributed resources, the promised demand reduction or electricity supply when called upon.
(8)Alignment with the Independent System Operators existing market participation models for aggregated distributed capacity resources, as modified pursuant to subdivision (d).
(b)The commission shall allow load-serving entities to include aggregated distributed capacity resources in resource adequacy filings and commission-ordered procurement pursuant to Section 454.54, consistent with the loading order in the states energy action plan.
(c)In adopting rules for aggregated distributed capacity resources to qualify for new resource procurement or to participate in the resource adequacy program, the commission shall ensure both of the following:
(1)Requirements for procurement or resource adequacy, including contract terms, shall not prevent load-serving entities from contracting with aggregated distributed capacity resources in favor of other types of resources lower in the loading order in the states energy action plan, except to the extent necessary to implement procurement of eligible resources with specific attributes that cannot be met by aggregated distributed capacity resources, such as providing clean firm generation or multiday energy storage. To the extent feasible, the commission shall provide reasonable flexibility in procurement requirements to accommodate the differing characteristics of resource types, including aggregated distributed capacity resources, to broaden the set of resources that can compete to meet the states procurement or resource adequacy needs at the lowest cost to ratepayers.
(2)Requirements shall not prevent entities that are not load-serving entities from developing and managing aggregated distributed capacity resources, including through limitations on enrollment authorization, and offering those resources for resource adequacy capacity or other procurement.
(d)On or before June 30, 2027, the commission shall develop recommendations for changes to the Independent System Operators proxy demand resource and the distributed energy resource aggregation participation models, including the must-offer obligation for each participation model, to be consistent with the commissions requirements for aggregated distributed capacity resources pursuant to this section, and shall request that the Independent System Operator implement these changes in a new or existing initiative.
(e)For purposes of this section, both of the following definitions apply:
(1)Aggregated distributed capacity resource means an aggregation of one or more distributed resources, as defined in Section 769, that are capable of supplying electricity to, or reducing electricity demand on, the electrical distribution system when called upon to do so.
(2)Load-serving entity has the same meaning as defined in Section 380.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)California faces increasing peak and net peak electricity demand due to continued growth and extreme temperatures during summer and winter months.
(2)Distributed energy resources can provide reliable, cost-effective dispatchable capacity that reduces the need for new fossil-fueled generation.
(3)When distributed energy resources are dispatched instead of fossil-fueled generation, it reduces greenhouse gas emissions in furtherance of the states climate targets and it reduces air pollution in the communities adjacent to the generation facilities that would otherwise have been dispatched.
(4)During recent summer reliability events, distributed energy resources delivered verifiable performance to support electrical grid stability. However, these resources ability to provide capacity is undervalued because, under current market and regulatory rules, they do not receive the full resource adequacy capacity value that they could provide.
(5)Unfortunately, the amount of demand response participating in resource adequacy has dramatically declined in recent years even though there are many more distributed energy resources today that could be available to support the electrical grid.
(6)The Independent System Operator is actively pursuing reforms through its demand and distributed energy market integration initiative to improve participation models for distributed energy resources, including the proxy demand resource and the distributed energy resource participation models.
(7)Coordination among the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, and the Independent System Operator is necessary to establish a durable, transparent, and timely pathway for more distributed energy resources to qualify for resource adequacy.
(b)It is the intent of the Legislature to address barriers that have unnecessarily limited the ability for distributed energy resources to qualify for resource adequacy capacity so that distributed energy resources can more easily be used, where cost effective, to meet electrical grid reliability standards while lowering costs for ratepayers, supporting decarbonization goals, and reducing air pollution.
SEC. 2.Section 380.1 is added to the Public Utilities Code, to read:380.1.(a)On or before June 30, 2027, the commission, in coordination with the Energy Commission and the Independent System Operator, shall enhance existing market-integrated pathways for aggregated distributed capacity resources to qualify as resource adequacy capacity, including by ensuring all of the following:
(1)Aggregated distributed capacity resources are able to qualify for local, system, or flexible resource adequacy capacity within any qualifying capacity or successor methodology adopted by the commission.
(2)Aggregate distributed capacity resources are eligible to receive resource adequacy credit for full capacity value, including energy exported past the utility meter.
(3)Reasonable and standardized requirements allow distributed resources within an aggregated distributed capacity resource that meet those requirements to be settled using device telemetry without the need for a revenue-grade meter.
(4)Qualifying capacity methodologies are consistent with the device-level measurement provisions of this section, credit both load reductions and net exports of energy during any hour of the day, fully integrate these resources into the current resource adequacy construct and counting conventions, and allow aggregated distributed capacity resources to combine different types of distributed resources and technologies.
(5)Multiple enrollment is authorized, allowing multiple devices to participate behind the same utility point of interconnection, including in separate programs, if there is no duplicate compensation for the same load reduction or energy export.
(6)Consumer data privacy is protected without unduly burdensome requirements on aggregated distributed capacity resource providers for enrollment and energy usage data access, such as requiring utility login, meter-level data sharing authorization, or other requirements that would limit the growth of aggregated distributed capacity resources, unless there is a clear statutory requirement or a clear and compelling need for the privacy requirements. To the extent feasible, the commission shall allow the use of opt-out enrollment structures and streamlined data access authorization processes to reduce the barriers to enrolling distributed resources into aggregated distributed capacity resources.
(7)To the extent feasible, all capacity determinations are technology neutral, based on measured performance, and weather normalized, allowing the broadest set of device types and technologies to be included within an aggregated distributed capacity resource and putting the burden on the aggregated distributed capacity resource provider to ensure that it can deliver, in total across all of its distributed resources, the promised demand reduction or electricity supply when called upon.
(8)Alignment with the Independent System Operators existing market participation models for aggregated distributed capacity resources, as modified pursuant to subdivision (d).
(b)The commission shall allow load-serving entities to include aggregated distributed capacity resources in resource adequacy filings and commission-ordered procurement pursuant to Section 454.54. 454.54, consistent with the loading order in the states energy action plan.
(c)In adopting rules for aggregated distributed capacity resource participation resources to qualify for new resource procurement or to participate in the resource adequacy program or in new procurement orders, program, the commission shall not do either ensure both of the following:
(1)Adopt requirements Requirements for procurement or resource adequacy, including contract terms, that would disincentivize shall not prevent load-serving entities from contracting with aggregated distributed capacity resources in favor of other types of resources lower in the loading order in the states energy action plan, except to the extent necessary to implement procurement of eligible resources with a construction and development lead time of at least five years, as described in Section 454.52. specific attributes that cannot be met by aggregated distributed capacity resources, such as providing clean firm generation or multiday energy storage. To the extent feasible, the commission shall provide reasonable flexibility in procurement requirements to accommodate the differing characteristics of resource types, including aggregated distributed capacity resources, to broaden the set of resources that can compete to meet the states procurement or resource adequacy needs at the lowest cost to ratepayers.
(2)Adopt requirements that would limit Requirements shall not prevent entities that are not load-serving entities in their ability to develop and manage from developing and managing aggregated distributed capacity resources and offer resources, including through limitations on enrollment authorization, and offering those resources for resource adequacy capacity or other procurement, including through limitations on enrollment authorization. procurement.
(d)On or before June 30, 2027, the commission shall develop recommendations for changes to the Independent System Operators proxy demand resource and the distributed energy resource aggregation participation models, including the must-offer obligation for each participation model, to be consistent with the commissions requirements for aggregated distributed capacity resources pursuant to this section, and shall request that the Independent System Operator implement these changes in a new or existing initiative.
(e)For purposes of this section, both of the following definitions apply:
(1)Aggregated distributed capacity resource means an aggregation of one or more distributed resources, as defined in Section 769, that are capable of supplying electricity to, or reducing electricity demand on, the electrical distribution system when called upon to do so.
(2)Load-serving entity has the same meaning as defined in Section 380.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)California faces increasing peak and net peak electricity demand due to continued growth and extreme temperatures during summer and winter months.
(2)Distributed energy resources can provide reliable, cost-effective dispatchable capacity that reduces the need for new fossil-fueled generation.
(3)When distributed energy resources are dispatched instead of fossil-fueled generation, it reduces greenhouse gas emissions in furtherance of the states climate targets and it reduces air pollution in the communities adjacent to the generation facilities that would otherwise have been dispatched.
(4)During recent summer reliability events, distributed energy resources delivered verifiable performance to support electrical grid stability. However, these resources ability to provide capacity is undervalued because, under current market and regulatory rules, they do not receive the full resource adequacy capacity value that they could provide.
(5)Unfortunately, the amount of demand response participating in resource adequacy has dramatically declined in recent years even though there are many more distributed energy resources today that could be available to support the electrical grid.
(6)The Independent System Operator is actively pursuing reforms through its demand and distributed energy market integration initiative to improve participation models for distributed energy resources, including the proxy demand resource and the distributed energy resource participation models.
(7)Coordination among the Public Utilities Commission, the State Energy Resources Conservation and Development Commission, and the Independent System Operator is necessary to establish a durable, transparent, and timely pathway for more distributed energy resources to qualify for resource adequacy.
(b)It is the intent of the Legislature to address barriers that have unnecessarily limited the ability for distributed energy resources to qualify for resource adequacy capacity so that distributed energy resources can more easily be used, where cost effective, to meet electrical grid reliability standards while lowering costs for ratepayers, supporting decarbonization goals, and reducing air pollution.
SEC. 2.Section 380.1 is added to the Public Utilities Code, to read:380.1.(a)On or before June 30, 2027, the commission, in coordination with the Energy Commission and the Independent System Operator, shall enhance existing market-integrated pathways for aggregated distributed capacity resources to qualify as resource adequacy capacity, including by ensuring all of the following:
(1)Aggregated distributed capacity resources are able to qualify for local, system, or flexible resource adequacy capacity within any qualifying capacity or successor methodology adopted by the commission.
(2)Aggregate distributed capacity resources are eligible to receive resource adequacy credit for full capacity value, including energy exported past the utility meter.
(3)Reasonable and standardized requirements allow distributed resources within an aggregated distributed capacity resource that meet those requirements to be settled using device telemetry without the need for a revenue-grade meter.
(4)Qualifying capacity methodologies are consistent with the device-level measurement provisions of this section, credit both load reductions and net exports of energy during any hour of the day, fully integrate these resources into the current resource adequacy construct and counting conventions, and allow aggregated distributed capacity resources to combine different types of distributed resources and technologies.
(5)Multiple enrollment is authorized, allowing multiple devices to participate behind the same utility point of interconnection, including in separate programs, if there is no duplicate compensation for the same load reduction or energy export.
(6)Consumer data privacy is protected without unduly burdensome requirements on aggregated distributed capacity resource providers for enrollment and energy usage data access, such as requiring utility login, meter-level data sharing authorization, or other requirements that would limit the growth of aggregated distributed capacity resources, unless there is a clear statutory requirement or a clear and compelling need for the privacy requirements. To the extent feasible, the commission shall allow the use of opt-out enrollment structures and streamlined data access authorization processes to reduce the barriers to enrolling distributed resources into aggregated distributed capacity resources.
(7)To the extent feasible, all capacity determinations are technology neutral, based on measured performance, and weather normalized, allowing the broadest set of device types and technologies to be included within an aggregated distributed capacity resource and putting the burden on the aggregated distributed capacity resource provider to ensure that it can deliver, in total across all of its distributed resources, the promised demand reduction or electricity supply when called upon.
(8)Alignment with the Independent System Operators existing market participation models for aggregated distributed capacity resources, as modified pursuant to subdivision (d).
(b)The commission shall allow load-serving entities to include aggregated distributed capacity resources in resource adequacy filings and commission-ordered procurement pursuant to Section 454.54.
(c)In adopting rules for aggregated distributed capacity resource participation in the resource adequacy program or in new procurement orders, the commission shall not do either of the following:
(1)Adopt requirements for procurement or resource adequacy, including contract terms, that would disincentivize load-serving entities from contracting with aggregated distributed capacity resources in favor of other types of resources lower in the loading order in the states energy action plan, except to the extent necessary to implement procurement of eligible resources with a construction and development lead time of at least five years, as described in Section 454.52.
(2)Adopt requirements that would limit entities that are not load-serving entities in their ability to develop and manage aggregated distributed capacity resources and offer those resources for resource adequacy capacity or other procurement, including through limitations on enrollment authorization.
(d)On or before June 30, 2027, the commission shall develop recommendations for changes to the Independent System Operators proxy demand resource and the distributed energy resource aggregation participation models, including the must-offer obligation for each participation model, to be consistent with the commissions requirements for aggregated distributed capacity resources pursuant to this section, and shall request that the Independent System Operator implement these changes in a new or existing initiative.
(e)For purposes of this section, both of the following definitions apply:
(1)Aggregated distributed capacity resource means an aggregation of one or more distributed resources, as defined in Section 769, that are capable of supplying electricity to, or reducing electricity demand on, the electrical distribution system when called upon to do so.
(2)Load-serving entity has the same meaning as defined in Section 380.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Section 25545 of the Public Resources Code is amended to read:25545.For purposes of this chapter, all of the following definitions apply:(a)California Native American tribe has the same meaning as set forth in Section 21073.(b)Facility means any of the following:(1)A solar photovoltaic or terrestrial wind electrical generating powerplant with a generating capacity of 50 megawatts or more and any facilities appurtenant to that powerplant.(2)An energy storage system as defined in Section 2835 of the Public Utilities Code that is capable of storing 200 megawatthours or more of energy.(3)A stationary electrical generating powerplant using any source of thermal energy, with a generating capacity of 50 megawatts or more, excluding any powerplant that burns, uses, or relies on fossil or nuclear fuels.(4)A discretionary project as described in Section 21080 for which the applicant has certified that a capital investment of at least two hundred fifty million dollars ($250,000,000) will be made over a period of five years and the discretionary project is for (A) the manufacture, production, or assembly of an energy storage system or component manufacturing, wind system or component manufacturing, and solar photovoltaic energy system or component manufacturing, or (B) the manufacture, production, or assembly of specialized products, components, or systems that are integral to renewable energy or energy storage technologies.(5)An electrical transmission line carrying electricity from a facility described in paragraph (1), (2), or (3) that is located in the state to a point of junction with any interconnected electrical transmission system.(6)A hydrogen production facility and associated onsite storage and processing facilities that do not derive hydrogen from a fossil fuel feedstock and that receive funding from any of the following:(A)The Hydrogen Program established pursuant to Section 25664.1.(B)Section 91530.(C)The Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) authorized by Article 15 (commencing with Section 12100.160) of Chapter 1.6 of Part 2 of Division 3 of Title 2 of the Government Code, as awarded by the United States Department of Energy Office of Clean Energy Demonstrations.(7)A geothermal powerplant or a project that comprises multiple geothermal powerplants on a single site.(c)Site means any location on which an eligible facility is constructed or is proposed to be constructed.For purposes of this chapter, all of the following definitions apply:
(a)California Native American tribe has the same meaning as set forth in Section 21073.
(b)Facility means any of the following:
(1)A solar photovoltaic or terrestrial wind electrical generating powerplant with a generating capacity of 50 megawatts or more and any facilities appurtenant thereto. to that powerplant.
(2)An energy storage system as defined in Section 2835 of the Public Utilities Code that is capable of storing 200 megawatthours or more of energy.
(3)A stationary electrical generating powerplant using any source of thermal energy, with a generating capacity of 50 megawatts or more, excluding any powerplant that burns, uses, or relies on fossil or nuclear fuels.
(4)A discretionary project as described in Section 21080 for which the applicant has certified that a capital investment of at least two hundred fifty million dollars ($250,000,000) will be made over a period of five years and the discretionary project is for (A) the manufacture, production, or assembly of an energy storage system or component manufacturing, wind system or component manufacturing, and solar photovoltaic energy system or component manufacturing, or (B) the manufacture, production, or assembly of specialized products, components, or systems that are integral to renewable energy or energy storage technologies.
(5)An electrical transmission line carrying electricity from a facility described in paragraph (1), (2), or (3) that is located in the state to a point of junction with any interconnected electrical transmission system.
(6)A hydrogen production facility and associated onsite storage and processing facilities that do not derive hydrogen from a fossil fuel feedstock and that receive funding from any of the following:
(A)The Hydrogen Program established pursuant to Section 25664.1.
(B)Section 91530, as added by the Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024. 91530.
(C)The Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) authorized by Article 15 (commencing with Section 12100.160) of Chapter 1.6 of Part 2 of Division 3 of Title 2 of the Government Code, as awarded by the United States Department of Energy Office of Clean Energy Demonstrations.
(7)A geothermal powerplant or a project that comprises multiple geothermal powerplants on a single site.
(c)Site means any location on which an eligible facility is constructed or is proposed to be constructed.
|
Date
|
Status
|
|---|---|
| Sep 30, 2026 | Chaptered by Secretary of State. Chapter 987, Statutes of 2026. |
| Sep 30, 2026 | Approved by the Governor. |
| Sep 2, 2026 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 27, 2026 | Assembly amendments concurred in. (Ayes 40. Noes 0. Page 6008.) Ordered to engrossing and enrolling. |
| Aug 27, 2026 | Assembly amendments concurred in. (Ayes 40. Noes 0.) Ordered to engrossing and enrolling. |
| Aug 25, 2026 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 25, 2026 | Read third time. Passed. (Ayes 59. Noes 3. Page 6528.) Ordered to the Senate. |
| Aug 25, 2026 | Read third time. Passed. Ordered to the Senate. |
| Aug 21, 2026 | Assembly Rule 69(b)(1) suspended. (Ayes 55. Noes 17. Page 6296.) |
| Aug 21, 2026 | Ordered to third reading. |
| Aug 21, 2026 | Read third time and amended. |
| Aug 21, 2026 | Assembly Rule 69(b)(1) suspended. |
| Aug 13, 2026 | Read second time. Ordered to third reading. |
| Aug 13, 2026 | From committee: Do pass. (Ayes 12. Noes 1.) (August 13). |
| Aug 13, 2026 | Assembly Rule 63 suspended. |
| Aug 5, 2026 | August 5 set for first hearing. Placed on suspense file. |
| Jun 29, 2026 | Read second time and amended. Re-referred to Com. on APPR. |
| Jun 25, 2026 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 15. Noes 0.) (June 24). |
| Jun 15, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on U. & E. |
| Jun 4, 2026 | Referred to Com. on U. & E. |
| May 27, 2026 | In Assembly. Read first time. Held at Desk. |
| May 27, 2026 | Read third time. Passed. (Ayes 39. Noes 0. Page 4497.) Ordered to the Assembly. |
| May 27, 2026 | Read third time. Passed. (Ayes 39. Noes 0.) Ordered to the Assembly. |
| May 18, 2026 | Read second time. Ordered to third reading. |
| May 14, 2026 | From committee: Do pass as amended. (Ayes 5. Noes 0. Page 4257.) (May 14). |
| May 14, 2026 | Read second time and amended. Ordered to second reading. |
| May 14, 2026 | From committee: Do pass as amended. (Ayes 5. Noes 0.) (May 14). |
| May 12, 2026 | Set for hearing May 14. |
| May 11, 2026 | May 11 hearing: Placed on APPR. suspense file. |
| May 4, 2026 | Set for hearing May 11. |
| Apr 29, 2026 | May 4 hearing postponed by committee. |
| Apr 24, 2026 | Set for hearing May 4. |
| Apr 20, 2026 | Re-referred to Com. on APPR. |
| Apr 20, 2026 | Withdrawn from committee. |
| Apr 16, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on P., D.T., & C.P. |
| Apr 13, 2026 | Read second time and amended. Re-referred to Com. on P., D.T., & C.P. |
| Apr 9, 2026 | From committee: Do pass as amended and re-refer to Com. on P., D.T., & C.P. (Ayes 15. Noes 0. Page 3755.) (April 7). |
| Apr 9, 2026 | From committee: Do pass as amended and re-refer to Com. on P., D.T., & C.P. (Ayes 15. Noes 0.) (April 7). |
| Mar 25, 2026 | Set for hearing April 7. |
| Mar 18, 2026 | Re-referred to Coms. on E., U & C. and P., D.T., & C.P. |
| Mar 11, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Feb 11, 2026 | Referred to Com. on RLS. |
| Jan 28, 2026 | From printer. May be acted upon on or after February 27. |
| Jan 27, 2026 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 27, 2026 | Unfinished Business SB913 Becker et al. Concurrence | Senate Floor |
Passed |
|
| Aug 25, 2026 | SB 913 Becker Senate Third Reading By Harabedian | Assembly Floor |
Passed |
|
| Aug 13, 2026 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jun 24, 2026 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Energy |
Passed |
|
| May 27, 2026 | Senate 3rd Reading SB913 Becker et al. | Senate Floor |
Passed |
|
| May 14, 2026 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| May 11, 2026 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 7, 2026 | Do pass as amended, but first amend, and re-refer to the Committee on [Privacy, Digital Technologies, and Consumer Protection] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 350 Bay Area Action | ** Support | |
| 350 Humboldt | ** Support | |
| Active San Gabriel Valley | ** Support | |
| Advanced Energy United | ** Support | |
| Affordable Energy Campaign | ** Support | |
| An individual | ** Against | |
| Ava Community Energy | ** Support | |
| Ava Community Energy Authority | ** Support | |
| Brightline Defense | ** Support | |
| California Alliance for Community Energy | ** Support | |
| California Coalition of Large Energy Users | ** Support | |
| california efficiency + demand management council | ** Support | |
| California Environmental Justice Alliance (CEJA) Action | ** Support | |
| California Public Interest Research Group | ** Support | |
| California Solar & Storage Association | ** Support | |
| Center For Biological Diversity | ** Support | |
| Center for Community Energy | ** Support | |
| Center For Environmental Health | ** Support | |
| Ceres | ** Support | |
| City of Mountain View | ** Support | |
| City Of San Diego | ** Support | |
| Clean Coalition | ** Support | |
| cleanearth4kids.org | ** Support | |
| Climate Action California | ** Support | |
| Climate Action Campaign | ** Support | |
| Climate Health Now Action Fund | ** Support | |
| Coalition of California Utility Employees | ** Against | |
| Community Environmental Council | ** Support | |
| County Of San Diego | ** Support | |
| Deploy Action | ** Support | |
| Derapi | ** Support | |
| Environmental Defense Fund | ** Support | |
| Environmental Protection Information Center | ** Support | |
| Environmental Working Group | ** Support | |
| Environment California | ** Support | |
| ev.energy | ** Support | |
| Friends Committee On Legislation Of California | ** Support | |
| Generac Power Systems | ** Support | |
| Generac Power Systems INC. | ** Support | |
| Immaculate Heart Community Environmental Commission | ** Support | |
| Independent Energy Producers Association | ** Against | |
| LEAP | ** Support | |
| Local Clean Energy Alliance | ** Support | |
| Local Government Sustainable Energy Coalition | ** Support | |
| NextGen California | ** Support | |
| Pacific Gas and Electric | ** Against | |
| Pesticide Action and Agroecology Network | ** Support | |
| Qcells | ** Support | |
| Reclaim Our Power: Utility Justice Campaign | ** Support | |
| Renew Homes | ** Support | |
| San Francisco Bay Physicians for Social Responsibility | ** Support | |
| San Jose Clean Energy | ** Support | |
| Santa Cruz Climate Action Network | ** Support | |
| Sierra Club California | ** Support | |
| Silicon Valley Youth Climate Action | ** Support | |
| Solar Energy Industries Association | ** Support | |
| Solar United Neighbors Action | ** Support | |
| Southern California Edisson | ** Against | |
| Sunrun | ** Support | |
| Tesla, Inc. | ** Support | |
| The Climate Center | ** Support | |
| The Climate Reality Project, Los Angeles Chapter | ** Support | |
| The Climate Reality Project, San Fernando Valley CA Chapter | ** Support | |
| The Energy Coalition | ** Support | |
| Two individuals | ** Against | |
| Uniting the Central Coast for Action | ** Support | |
| U.S. Green Building Council California | ** Support | |
| Voltus, Inc. | ** Support | |
| Vote Solar | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 913 |
UNFINISHED BUSINESS
Bill No: SB 913
Author: Becker (D), et al.
Amended: 8/21/26
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 15-0, 4/7/26
AYES: Allen, Ochoa Bogh, Archuleta, Arreguín, Becker, Caballero, Gonzalez, Hurtado, McNerney, Reyes, Richardson, Rubio, Stern, Strickland, Wahab
NO VOTE RECORDED: Dahle, Grove
SENATE APPROPRIATIONS COMMITTEE: 5-0, 5/14/26
AYES: Cervantes, Cabaldon, Grayson, Richardson, Wahab
NO VOTE RECORDED: Seyarto, Dahle
SENATE FLOOR: 39-0, 5/27/26
AYES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
NO VOTE RECORDED: Dahle
ASSEMBLY FLOOR: 59-3, 8/25/26 - See last page for vote
SUBJECT: Resource adequacy: aggregated distributed energy resources
SOURCE: Environment California
The Climate Center
DIGEST:
This bill proposes policy changes to authorize and expand the use of aggregated distributed energy resources (DERs) to satisfy resource adequacy (RA) requirements.
Assembly Amendments
move the date by one year, to June 30, 2028, by when the California Public Utilities Commission (CPUC) must enhance existing market-integrated pathways for aggregated distributed energy resources and provide recommendations to the California Independent System Operator (CAISO), as specified; provide the CPUC with discretion to address device-level telemetry, instead of prescribing related requirements; requires the CPUC to establish conditions where customer-sited DERs may receive credit for energy exported past the utility meter; and recasts the language concerning participation in Net-Energy Metering (NEM).
ANALYSIS:
Existing law:
- Establishes and vests the CPUC with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires the CAISO, as a nonprofit, public benefit corporation, to conduct its operations consistent with applicable state and federal laws and consistent with the interests of the people of the state. (Public Utilities Code §345.5)
- Requires the CAISO to ensure the efficient use and reliable operation of the transmission grid, as provided. (Public Utilities Code §345)
- Requires the CPUC, in consultation with the CAISO, to establish RA requirements for all load-serving entities (LSEs) and requires the CPUC in establishing those requirements to ensure the reliability of electrical service in California. Requires the RA program to facilitate the development of new generating, non-generating, hybrid capacity and retention of existing generating, non-generating, and hybrid capacity that is economical and needed for reliability. Requires that the RA program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified. Defines LSE, for that purpose, as an electrical corporation, electric service provider (ESP), or community choice aggregator (CCA). (Public Utilities Code §380)
- Defines “distributed resources” to mean distributed renewable generation resources, energy efficiency, energy storage, electric vehicles, and demand response technologies. (Public Utilities Code §769)
- Creates the Demand Side Grid Support (DSGS) Program and requires the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) to implement and administer the program to incentivize dispatchable customer load reduction and backup generation operation as on-call emergency supply and load reduction for the state’s electrical grid during extreme events. (Public Resources Code §25792)
This bill:
- Makes several findings and declarations concerning the role of DERs to provide capacity value to satisfy RA requirements.
- Requires the CPUC, in coordination with the CEC and the CAISO, on or before June 30, 2028, to enhance existing market-integrated pathways for aggregated DERs, as defined, to qualify as RA capacity.
- Requires the CPUC to establish the conditions for the use of aggregated DERs while ensuring NEM customers and net billing tariff (NBT) customers do not receive duplicate compensation, as provided.
- Requires the CPUC to allow electrical corporations, ESPs, and CCAs to include aggregated DERs in RA filings and CPUC-ordered procurement.
- Requires the CPUC, on or before June 30, 2028, to develop recommendations for changes to the CAISO’s proxy demand resource and the DER aggregation participation models to be consistent with the CPUC’s requirements for aggregated DERs pursuant to these provisions, and to communicate the recommendations to the CAISO for consideration in a new or existing initiative.
Background
Resource adequacy (RA). Following the California energy crisis of 2000-01, the California Legislature enacted legislation to prevent future incidents of widespread blackouts and rolling brownouts due to lack of electric generating capacity. Among the reforms adopted in response to the crisis was the adoption of Public Utilities Code §380 as an effort to better ensure reliability of electric supply. The statute directs the CPUC, in consultation with the CAISO, to establish RA requirements for all LSEs, including electric investor-owned utilities (IOUs), ESPs, and now includes CCAs, which did not exist at the time of the crisis.
The current RA program consists of system, local, and flexible requirements for each month of a compliance year. There are two types of filings: Annual filings (filed on or around October 31st) and Monthly filings (filed 45 calendar days prior to the compliance month). For the monthly filings, LSEs must demonstrate they have procured 100% of their monthly System and Flexible RA obligation. For the Annual filings, in October of each year, LSEs must demonstrate that they have procured 90% of their system RA obligations for the five summer months (May-September) of the following year, as well as 100% of their local requirements, and 90% of their flexible requirements for each month of the coming compliance year. The CPUC has adopted changes to RA program in recent years, including increasing the planning reserve margin from 15% to 17% by 2024 for all LSEs and in the case of electric IOUs upwards of 20-22% effective planning reserve margin. The CPUC has required a multi-year local capacity RA requirement and adopted local capacity requirements for the upcoming three years. The CAISO conducts a Local Capacity Technical Analysis to identify the minimum local resource capacity required in each local area to meet energy needs used a 1-in-10 weather year and N-1-1(emergency) contingency. The CPUC also assesses penalties on the LSEs who fail to satisfy their RA obligations, including limiting the expansion of CCAs if they are deficient in their RA requirements.
Slice-of-Day Framework. The CPUC is also amid a significant change to the RA program by implementing a slice-of-day framework that assesses the hourly use of resources. The CPUC has been developing the new structure for a few years and in 2025 implemented the first year of the slice-of-day framework. The CPUC adopted a 17% planning reserve margin for the slice-of-day framework, consistent with previous planning reserve margins, to procure enough RA to meet load obligations in each hour rather than monthly. Under the slice-of-day framework, LSEs receive a 24-hour obligation for each of the 12 months of the year. The new RA framework requires that resources, including energy storage resources, demonstrate their ability to provide capacity during specific, critical hours rather than just a daily peak.
RA Compensation. Resources used to meet an LSE’s RA requirement are compensated for the ability to call on the resource when needed, known as a “must-offer obligation.” A resource that commits to providing RA undertakes the “must-offer obligation” to bid or self-schedule its capacity into the CAISO wholesale market, ensuring capacity is available for system reliability. When generators contract with LSEs to provide RA, they must make their capacity available or face penalties. The actual dispatch of resources to meet load in real-time is performed on an economic basis, with the lowest cost resources committed first. As such, RA resources must be offered into the wholesale market, but they may not be dispatched to serve load if there are less expensive resource bids available (including non-RA resources). The RA program provides an additional source of revenue beyond just actual energy sales. To qualify to sell RA, a resource type must first be assigned a qualifying capacity (QC) from the CPUC, which represents a resource’s maximum capacity eligible to be counted towards meeting its RA. The resource must then register with the CAISO and be tested to determine if it is “deliverable” to load when the transmission system is stressed by high demand. Following the deliverability assessment, each resource is assigned a net qualifying capacity (“NQC”) value, which defines the amount of RA that it can sell. For intermittent resources like wind and solar, the NQC value is typically well below the nameplate capacity of the facility. Demand response and energy storage resources are eligible to provide RA value, while energy efficiency is generally subtracted from the load forecast. In the case of behind-the-meter energy storage resources, they do not receive value for their exports to the grid.
Comments
Need for this bill. According to the author:
Californians are struggling with rising electricity bills, and we need to use our grid more intelligently and cost-effectively. Instead of always building expensive new infrastructure to meet just a few peak hours of demand, we should be making better use of the resources we already have in our homes. Millions of Californians already have tools like smart thermostats, home batteries, and electric vehicles that can help support the grid. SB 913 ensures we can use those resources to lower costs, reduce pollution, and improve reliability.
Supporters frustrated by the value of DERs and aggregated resources within the RA market. The supporters of this bill express frustrations that behind-the-meter DERs and aggregated resources are not able to compete fairly within the RA market. They contend that a myriad of existing rules at the CPUC and CAISO diminish the value of these resources to participate more fully in the wholesale market compared to other energy resources. They believe this bill is necessary to level the playing field and ensure these resources can provide their full benefit to the electrical system and as such help reduce costs for all customers. They point to the success of the CEC’s DSGS Program which has enrolled over 1000 megawatts of DERs to participate in the program. The DSGS Program provides incentives to reduce customer net load during extreme events with upfront capacity commitments and for per-unit reductions in net load. The DSGS Program has been funded through the State Budget, however, the opportunity for future funds is less certain. The supporters contend that the continued growth of battery energy storage systems and electric vehicles, for example, presents an opportunity to aggregate these loads and help reduce consumption during peak periods, thereby reducing the strain on the electric grid. They view these resources as untapped potential, noting that of the 2.5 million electric vehicles in California today, only around 25,000 are on managed charging programs, and that smart thermostats and smart electric panels add to the ability to reduce consumption when wholesale market prices skyrocket.
Various efforts to re-examine the value of energy storage and DERs, including aggregations, for RA. As noted above, both the CPUC and CAISO have important roles in developing the RA program and the values of the various energy resources used in the program. As DERs volume has grown and types have expanded, including solar, energy storage, electric vehicles, and others load-modifying resources (including the aggregation of thermostats) there is growing demand by stakeholders to better optimize their participation in the wholesale market by modifying load and to receive capacity value for their exported energy. The CAISO tariffs allow aggregations of DERs to participate in its markets. However, the issue of the full capacity value for behind-the-meter DERs and aggregation has continued to be pressed by stakeholders at the CPUC and CAISO for many years.
The CPUC has an open proceeding (R. 25-09-004, Scoping Memo dated February 12, 2026) which considers additional enhancements to demand response programs, including revisiting valuation methodologies, CAISO market integration topics, and RA valuation. Additionally, the CAISO also has a current working group, Demand and Distributed Energy Market Integration Working Group, that is actively discussing enhancements to, or development of, participation models and market rules facilitating the representation of demand and distributed energy, either independently or managed aggregation, in the CAISO wholesale markets. CAISO demand and distributed energy market integration initiative was launched in February 2025 and issued a Discussion Paper on November 26, 2025, which is now helping to shape priorities for these issues, including the value of behind-the-meter energy storage exports, value of aggregated DERs, and other related issues raised in this bill.
Bill seeks CPUC decisions on RA capacity outcomes. This bill intends to encourage the CPUC and CAISO to adopt enhancements to existing rules in order to achieve the supporters’ goals to attain greater capacity value for aggregated DERs within the RA program. This bill requires the CPUC to evaluate the value for energy exports from behind-the-meter energy, aggregation of these resources, multiple devices and multiple enrollments behind the same customer meter, using device telemetry, and customer enrollments that require utility login or other barriers. This bill provides the CPUC the opportunity to address these considerations within the CPUC proceedings and CAISO initiatives, particularly as they may need to address how such efforts may affect other program participation and compensation. The supporters of this bill support legislative direction and requirements to ensure the CPUC fully considers the use of DERs within RA program.
Related/Prior Legislation
SB 1138 (Padilla, 2026) would have required the CPUC to allow LSEs to satisfy 25% of their RA requirements by trading energy capacity with other LSEs. The bill was held by the Assembly Appropriations Committee.
AB 740 (Harabedian, 2025) would have required the CEC, in the next update to the biennial integrated energy policy report after January 1, 2027, and subject to available funding, to adopt a virtual power plant deployment plan. The bill was vetoed.
AB 44 (Schultz, 2025) would have required the CEC, on or before December 1, 2026, and in consultation with LSEs and resource aggregators, to define and publicize methodologies for load modification protocols by which a LSE may reduce or modify its electrical demand forecast upon aggregated system operation of behind-the-meter load modifying technologies and programmatic measures deemed to reliably reduce or modify the LSE’s electrical demand. The bill was vetoed.
SB 541 (Becker, 2025) would have required the CEC, in consultation with specified entities, to analyze the cost-effectiveness of specific load flexibility programs and other types of load-shifting interventions and identify both the approximate amount of load shifting and the cost-effectiveness of each type of load-shifting intervention in the next update to the biennial integrated energy policy report after January 1, 2027, as provided. The bill was vetoed.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee:
This bill will entail considerable costs for the CPUC, likely in the millions of dollars, to establish conditions under which a DER located on the customer side of the electric utility meter may export electricity past the utility meter, revise the RA program in keeping with bill and complete other activities.
For its part, the CPUC asserts it will need $7.5 million (Public Utilities Commission Utilities Reimbursement Account), though the CPUC did not attribute these costs to specific activities or personnel, contracting or equipment needs.
Costs to the CEC to coordinate with the CPUC should be minor and absorbable.
SUPPORT: (Verified 8/24/26)
Environment California (co-source)
The Climate Center (co-source)
350 Bay Area Action
350 Humboldt
Active San Gabriel Valley
Advanced Energy United
Ava Community Energy
California Alliance for Community Energy
California Efficiency + Demand Management Council
California Public Interest Research Group
California Solar & Storage Association
Center for Biological Diversity
Center for Community Energy
Center for Environmental Health
Ceres
City of Mountain View
City of San Diego
Clean Coalition
CleanEarth4Kids.org
Climate Action California
Climate Action Campaign
Climate Health Now Action Fund
Community Environmental Council
County of San Diego
Deploy Action
Derapi
Environmental Defense Fund
Environmental Protection Information Center
Environmental Working Group
ev.energy
Friends Committee on Legislation of California
Generac Power Systems
Immaculate Heart Community Environmental Commission
Leap
Local Clean Energy Alliance
Local Government Sustainable Energy Coalition
NextGen California
Pesticide Action and Agroecology Network
Qcells
Reclaim Our Power: Utility Justice Campaign
Renew Homes
San José Clean Energy
Santa Cruz Climate Action Network
Sierra Club California
Silicon Valley Youth Climate Action
Solar Energy Industries Association
Solar United Neighbors Action
Tesla, Inc.
The Energy Coalition
Uniting the Central Coast for Action
U.S. Green Building Council California
Voltus, Inc.
Vote Solar
OPPOSITION: (Verified 8/24/26)
Coalition of California Utility Employees
Independent Energy Producers Association
Two Individuals
ARGUMENTS IN SUPPORT: According to the California Solar and Storage Association:
DERs are currently eligible to provide Resource Adequacy, but several rules prohibit them from providing their full capacity. In particular, DERs currently do not receive any credit for energy that is exported past the customer’s utility meter onto the distribution system, significantly capping the potential for these resources to provide peak capacity when California’s grid needs it the most. Consequently, this rule and several others have limited DERs’ ability to provide Resource Adequacy as an additional resource that is available to utilities. …This bill would put DERs on equal footing with large resources and allow them to compete and be called upon when they are a cost-effective resource. This will help put downward pressure on rates as it lowers the cost that load-serving entities pay for Resource Adequacy, and it will be a source of clean peak capacity.
ARGUMENTS IN OPPOSITION: According to the Coalition of California Utility Employees:
…there is no guarantee that that the DERs would actually provide resource adequacy. Allowing DERs to count for full resource adequacy credit is problematic if the DERs are not operated or controlled by the IOUs. There is no way to control third-party operation of them and imposing a penalty if the capacity is not delivered is not enough. History shows that penalties are just a part of doing business. This bill would count a DER as capacity even though it might not be available to a load serving entity to benefit the grid because it’s being used to benefit the private interest of the customer.
ASSEMBLY FLOOR: 59-3, 8/25/26
AYES: Addis, Aguiar-Curry, Ahrens, Alvarez, Arambula, Ávila Farías, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Caloza, Carrillo, Connolly, Fong, Gabriel, Garcia, Gipson, Mark González, Haney, Harabedian, Hart, Irwin, Jackson, Kalra, Krell, Lee, Lowenthal, Muratsuchi, Nguyen, Ortega, Pacheco, Papan, Patel, Pellerin, Petrie-Norris, Quirk-Silva, Ransom, Celeste Rodriguez, Michelle Rodriguez, Rogers, Blanca Rubio, Schiavo, Schultz, Sharp-Collins, Solache, Soria, Stefani, Ta, Valencia, Wallis, Ward, Wicks, Wilson, Zbur, Rivas
NOES: DeMaio, Ellis, Macedo
NO VOTE RECORDED: Alanis, Castillo, Chen, Davies, Dixon, Elhawary, Flora, Jeff Gonzalez, Hadwick, Hoover, Johnson, Lackey, McKinnor, Patterson, Ramos, Sanchez, Tangipa
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
8/25/26 18:55:45
**** END ****
SENATE THIRD READING
STR Bill Id:SB 913
Author:(Becker)
As Amended Ver:August 21, 2026
Majority vote
SUMMARY
Changes the resource adequacy (RA) program requirements to expand the use of, and RA credit allocated to, aggregated distributed energy resources (ADERs).
Major Provisions
More specially, this bill defines ADERs to mean an aggregation of more than one DER that is capable of supplying electricity to, or reducing electricity demand on, the electrical distribution system when called upon to do so.
In addition, the bill, among other things, requires the California Public Utilities Commission (CPUC):
- In coordination with the California Energy Commission (CEC) and the California Independent System Operator (CAISO), to enhance what the bill terms "market-integrated pathways" for ADERs to qualify as RA capacity.
- Establish conditions under which a DER located on the customer side of the electric utility meter may export electricity past the utility meter as part of an ADER, if certain conditions are met.
- Allow load-serving entities (LSEs) – investor-owned electrical utilities (IOUs), community choice aggregators (CCAs) and electric service providers (ESPs) – to include ADERs in RA filings with the CPUC and CPUC-ordered procurement of energy resources, if certain conditions are met.
- By June 30, 2028, develop recommendations for changes to certain CAISO models to make those models consistent with the CPUC’s requirements for ADERs.
COMMENTS
The CPUC requires each LSE to demonstrate it has procured sufficient energy resources to meet its legal obligations. One such obligation is that the LSE demonstrates to the CPUC each month that it has procured an adequate supply of energy resources. This obligation is referred to resource adequacy, or "RA." Essentially, the operator of an energy resource that has contracted with an LSE to provide RA is agreeing to be capable of supplying energy resources when the LSE calls upon it to do so. This is analogous to a caterer (an LSE) who has a roster of on-call chefs (resources) for big events: the chefs don’t cook daily but must be ready to show up, knives sharp, and cook the moment they're called.
Generally, an LSE satisfies its RA obligations by procuring capacity from resources capable of generating or storing electricity. Typically, such a resource – a power plant, a solar array, a windmill or a battery – is centralized, located on the utility side of customers' electricity meter and transmitted to customers by electricity transmission (higher voltage) and distribution (lower voltage) lines. DERs, in contrast, are a wide variety of energy resources – such as electric vehicles, batteries, and microgrids, among many others – distributed across an LSE’s distribution (lower voltage) system; some reduce customer load, others produce small amounts of energy.
This bill envisions harnessing many dispersed DERs to collectively reduce electricity demand when called upon to do so and allowing such harnessing to count towards an LSE’s RA capacity requirements and other energy procurement obligations. The idea is not wholly new. Pursuant to AB 205 (Committee on the Budget), Chapter 61, Statutes of 2022, the CEC has administered the Demand Side Grid Support (DSGS) Program to provide incentives to customers with DERs who agree to provide load reduction and backup generation to support the state’s electrical grid during extreme events. Underlying these efforts is a practical financing concern: without a clear pathway to earn RA credit, and the revenue that comes with it, aggregators and DER providers may struggle to build viable business models around these resources, limiting deployment and participation well below what the grid could otherwise support. By establishing RA credit eligibility for ADERs, this bill aims to provide a market-based funding mechanism that does not depend on continued state budget appropriations.
According to the Author
According to the author, "Californians are struggling with rising electricity bills, and we need to use our grid more intelligently and cost-effectively. Instead of always building expensive new infrastructure to meet just a few peak hours of demand, we should be making better use of the resources we already have in our homes. Millions of Californians already have tools like smart thermostats, home batteries, and electric vehicles that can help support the grid. SB 913 ensures we can use those resources to lower costs, reduce pollution, and improve reliability."
Arguments in Support
This bill is supported by a large coalition of organizations made up of environmental groups, ratepayer advocates, community groups and industry. They describe the bill as enabling the state to maintain reliability more efficiently (though they decry exclusion of net-energy-metering-participating resources). Specifically they note, "fully utilizing customer-sited resources is a common-sense approach to meeting California’s growing electricity needs, reducing reliance on costly and polluting power plants, and addressing the state’s electricity affordability crisis."
Arguments in Opposition
The bill is opposed by the Coalition of California Utility Employees who cite two areas of concern: 1) that "there is no guarantee that the DERs would actually provide RA" and 2) by creating “another revenue stream for the rooftop solar industry" that "will exacerbate an already unsustainable cost shift."
FISCAL COMMENTS
According to the Assembly Committee on Appropriations, this bill will result in considerable costs for the CPUC, asserted by the CPUC to be approximately $7.5 million.
VOTES
SENATE FLOOR: 39-0-1
YES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
ABS, ABST OR NV: Dahle
ASM UTILITIES AND ENERGY: 15-0-3
YES: Petrie-Norris, Boerner, Calderon, Mark González, Harabedian, Hart, Irwin, Kalra, Papan, Rogers, Schiavo, Schultz, Ta, Wallis, Zbur
ABS, ABST OR NV: Patterson, Chen, Davies
ASM APPROPRIATIONS: 12-1-2
YES: Wicks, Arambula, Calderon, Caloza, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache, Ta
NO: Dixon
ABS, ABST OR NV: Hoover, Tangipa
UPDATED
VERSION: August 21, 2026
CONSULTANT: Laura Shybut / U. & E. / (916) 319-2083 FN: 0004011
SENATE THIRD READING
STR Bill Id:SB 913
Author:(Becker)
As Amended Ver:June 29, 2026
Majority vote
SUMMARY
Changes the resource adequacy (RA) program requirements to expand the use of, and RA credit allocated to, aggregated distributed energy resources (ADERs).
Major Provisions
More specially, this bill defines aggregated DER to mean an aggregation of more than one DER that is capable of supplying electricity to, or reducing electricity demand on, the electrical distribution system when called upon to do so, but that does not include a DER, such as a rooftop solar array, participating in a net metering tariff pursuant to existing law.
In addition, the bill, among other things, requires the California Public Utilities Commission (CPUC):
- In coordination with the California Energy Commission (CEC) and the California Independent System Operator (CAISO), to enhance what the bill terms "market-integrated pathways" for ADERs to qualify as RA capacity.
- Establish conditions under which a DER located on the customer side of the electric utility meter may export electricity past the utility meter as part of an ADER, if certain conditions are met.
- Allow load-serving entities (LSEs) – investor-owned electrical utilities (IOUs), community choice aggregators (CCAs) and electric service providers (ESPs) – to include ADERs in RA filings with the CPUC and CPUC-ordered procurement of energy resources, if certain conditions are met.
- By June 30, 2027, develop recommendations for changes to certain CAISO models to make those models consistent with the CPUC's requirements for ADERs.
COMMENTS
The CPUC requires each LSE to demonstrate it has procured sufficient energy resources to meet its legal obligations. One such obligation is that the LSE demonstrates to the CPUC each month that it has procured an adequate supply of energy resources. This obligation is referred to resource adequacy, or "RA." Essentially, the operator of an energy resource that has contracted with an LSE to provide RA is agreeing to be capable of supplying energy resources when the LSE calls upon it to do so. This is analogous to a caterer (an LSE) who has a roster of on-call chefs (resources) for big events: the chefs don't cook daily but must be ready to show up, knives sharp, and cook the moment they're called.
Generally, an LSE satisfies its RA obligations by procuring capacity from resources capable of generating or storing electricity. Typically, such a resource – a power plant, a solar array, a windmill or a battery – is centralized, located on the utility side of customers' electricity meter and transmitted to customers by electricity transmission (higher voltage) and distribution (lower voltage) lines. DERs, in contrast, are a wide variety of energy resources – such as electric vehicles, batteries, and microgrids, among many others – distributed across an LSE's distribution (lower voltage) system; some reduce customer load, others produce small amounts of energy.
This bill envisions harnessing many dispersed DERs to collectively reduce electricity demand when called upon to do so and allowing such harnessing to count towards an LSE's RA capacity requirements and other energy procurement obligations. The idea is not wholly new. Pursuant to AB 205 (Committee on the Budget), Chapter 61, Statutes of 2022, the CEC has administered the Demand Side Grid Support (DSGS) Program to provide incentives to customers with DERs who agree to provide load reduction and backup generation to support the state's electrical grid during extreme events. Underlying these efforts is a practical financing concern: without a clear pathway to earn RA credit, and the revenue that comes with it, aggregators and DER providers may struggle to build viable business models around these resources, limiting deployment and participation well below what the grid could otherwise support. By establishing RA credit eligibility for ADERs, this bill aims to provide a market-based funding mechanism that does not depend on continued state budget appropriations.
According to the Author
According to the author, "Californians are struggling with rising electricity bills, and we need to use our grid more intelligently and cost-effectively. Instead of always building expensive new infrastructure to meet just a few peak hours of demand, we should be making better use of the resources we already have in our homes. Millions of Californians already have tools like smart thermostats, home batteries, and electric vehicles that can help support the grid. SB 913 ensures we can use those resources to lower costs, reduce pollution, and improve reliability."
Arguments in Support
This bill is supported by a large coalition of organizations made up of environmental groups, ratepayer advocates, community groups and industry. They describe the bill as enabling the state to maintain reliability more efficiently (though they decry exclusion of net-energy-metering-participating resources). Specifically, they note, "fully utilizing customer-sited resources is a common-sense approach to meeting California's growing electricity needs, reducing reliance on costly and polluting power plants, and addressing the state's electricity affordability crisis."
Arguments in Opposition
The bill is opposed by the Coalition of California Utility Employees who cite two areas of concern: 1) that "there is no guarantee that the DERs would actually provide RA" and 2) by creating "another revenue stream for the rooftop solar industry" that "will exacerbate an already unsustainable cost shift." It is unclear how the utility employees' position may have changed following amendments to exclude certain rooftop solar customers from the DER program, as is currently in the bill.
FISCAL COMMENTS
According to the Assembly Committee on Appropriations, this bill will result in considerable costs for the CPUC, asserted by the CPUC to be approximately $7.5 million.
VOTES
SENATE FLOOR: 39-0-1
YES: Allen, Alvarado-Gil, Archuleta, Arreguín, Ashby, Becker, Blakespear, Cabaldon, Caballero, Cervantes, Choi, Cortese, Durazo, Gonzalez, Grayson, Grove, Hurtado, Jones, Laird, Limón, McGuire, McNerney, Menjivar, Niello, Ochoa Bogh, Padilla, Pérez, Reyes, Richardson, Rubio, Seyarto, Smallwood-Cuevas, Stern, Strickland, Umberg, Valladares, Wahab, Weber Pierson, Wiener
ABS, ABST OR NV: Dahle
ASM UTILITIES AND ENERGY: 15-0-3
YES: Petrie-Norris, Boerner, Calderon, Mark González, Harabedian, Hart, Irwin, Kalra, Papan, Rogers, Schiavo, Schultz, Ta, Wallis, Zbur
ABS, ABST OR NV: Patterson, Chen, Davies
ASM APPROPRIATIONS: 12-1-2
YES: Wicks, Arambula, Calderon, Caloza, Fong, Mark González, Krell, Pacheco, Pellerin, Sharp-Collins, Solache, Ta
NO: Dixon
ABS, ABST OR NV: Hoover, Tangipa
UPDATED
VERSION: June 29, 2026
CONSULTANT: Laura Shybut / U. & E. / (916) 319-2083 FN: 0003475
Date of Hearing: August 5, 2026
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 913
Author:(Becker) – As Amended Ver:June 29, 2026
Policy Committee: | Utilities and Energy | Vote: | 15 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill makes various requirements of the California Public Utilities Commission (CPUC) to reduce barriers that prevent or hinder distributed energy resources (DERs) from qualifying as resource adequacy (RA) capacity for purposes of CPUC electricity supply planning.
More specially, this bill defines aggregated DER to mean an aggregation of more than one distributed resource that is capable of supplying electricity to, or reducing electricity demand on, the electrical distribution system when called upon to do so, but that does not include a DER, such as a rooftop solar array, participating in a net metering tariff pursuant to existing law.
In addition, the bill, among other things, requires the CPUC:
- In coordination with the California Energy Commission (CEC) and the California Independent System Operator (CAISO), enhance what the bill terms “market-integrated pathways” for aggregated DERs to qualify as RA capacity.
- Establish conditions under which a DER located on the customer side of the electric utility meter may export electricity past the utility meter as part of an aggregated DER, if certain conditions are met.
- Allow load-serving entities (LSEs)—investor-owned electrical utilities (IOUs), community choice aggregators (CCAs) and electric service providers (ESPs)—to include aggregated DERs in RA filings with the CPUC and CPUC-ordered procurement of energy resources, if certain conditions are met.
- By June 30, 2027, develop recommendations for changes to certain CAISO models to make those models consistent with the CPUC’s requirements for aggregated DERs.
FISCAL EFFECT:
This bill will entail considerable costs for the CPUC, likely in the millions of dollars, to establish conditions under which a DER located on the customer side of the electric utility meter may export electricity past the utility meter, revise the RA program in keeping with bill and complete other activities.
For its part, the CPUC asserts it will need $7.5 million (Public Utilities Commission Utilities Reimbursement Account), though the CPUC did not attribute these costs to specific activities or personnel, contracting or equipment needs.
Costs to the CEC to coordinate with the CPUC should be minor and absorbable.
COMMENTS:
- Purpose. The author intends this bill to forestall or displace the need to build new energy infrastructure, and the associated costs, by allowing a variety of resources on the electricity distribution level, usually on the customer side of the electricity meter, to be aggregated and count towards electricity procurement requirements. According to the author:
Californians are struggling with rising electricity bills, and we need to use our grid more intelligently and cost-effectively. Instead of always building expensive new infrastructure to meet just a few peak hours of demand, we should be making better use of the resources we already have in our homes. Millions of Californians already have tools like smart thermostats, home batteries, and electric vehicles that can help support the grid. SB 913 ensures we can use those resources to lower costs, reduce pollution, and improve reliability.
- Background. The CPUC requires each LSE to demonstrate it has procured sufficient energy resources to meet its legal obligations. One such obligation is that the LSE demonstrates to the CPUC each month that it has procured an adequate supply of energy resources. This obligation is referred to resource adequacy, or “RA.” Essentially, the operator of an energy resource that has contracted with an LSE to provide RA is agreeing to be capable of supplying energy resources when the LSE calls upon it to do so.
In addition, the CPUC requires each LSE file with it every three years an integrated resource plan (IRP), which demonstrates how the LSE will procure energy resources sufficient to meet increasingly stringent obligations that such resources be renewable and not emit greenhouse gases.
Generally, an LSE satisfies its RA obligations by procuring capacity from resources capable of generating or storing electricity. Typically, such a resource—a power plant, a solar array, a windmill or a battery, for example—is centralized, located on the utility side of customers’ electricity meter and transmitted to customers by electricity transmission (higher voltage) and distribution (lower voltage) lines.
DERs, in contrast, are, as their name implies, a wide variety of energy resources—such as electric vehicles, storage devices and microgrids, among many others—distributed across an LSE’s distribution (lower voltage) system.
This bill envisions harnessing many dispersed DERs under contractual obligations to reduce electricity demand when called upon to do so and allowing these obligations to count towards an LSE’s RA capacity requirements and other energy procurement obligations.
The idea is not wholly new. Pursuant to AB 205 (Committee on the Budget), Chapter 61, Statutes of 2022, the energy budget trailer bill, the CEC has administered the Demand Side Grid Support (DSGS) Program to provide incentives to customers with DERs who agree to provide load reduction and backup generation to support the state’s electrical grid during extreme events.
- Support and Opposition. Bill advocates—a large coalition that presents itself as made up of environmental organizations, ratepayer advocates, community groups and industry, describes the bill as enabling the state to maintain reliability more efficiently (though they decry exclusion of NEM-participating resources):
By enhancing how distributed energy resources participate in California’s Resource Adequacy framework and wholesale energy markets, the bill will allow these technologies to help meet electricity demand when they are the most cost-effective option….Fully utilizing customer-sited resources is a common-sense approach to meeting California’s growing electricity needs, reducing reliance on costly and polluting power plants, and addressing the state’s electricity affordability crisis. Expanding the role of distributed energy resources can also help avoid or defer expensive new grid infrastructure, saving money for ratepayers while supporting the state’s clean energy goals.
Two of the state’s three largest electric IOUs disagree. Southern California Edisson objects, warning this bill “risks undermining the integrity of the RA program by introducing new distributed resource eligibility standards without ensuring equivalent reliability, deliverability, and performance across existing RA resources.” Similarly, Pacific Gas and Electric opposes the bill, describing it as preempting “multiple ongoing regulatory proceedings by requiring broad adoption of DER export RA value, even in cases where it might not be feasible or desirable” and that “These provisions introduce risks to customer affordability, grid reliability, and customer privacy.”
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: June 24, 2026
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
SBPCA Bill Id:SB 913
Author:(Becker) – As Amended Ver:June 15, 2026
SENATE VOTE: 39-0
SUBJECT: Resource adequacy: aggregated distributed capacity resources
SUMMARY: Changes the resource adequacy (RA) program requirements to expand the use of, and RA credit allocated to, aggregated distributed energy resources (ADERs). Specifically, this bill:
- Requires the California Public Utilities Commission (CPUC), in coordination with the California Energy Commission (CEC) and the California Independent System Operator (CAISO), on or before June 30, 2027, to enhance existing market-integrated pathways for aggregated distributed capacity resources, as defined, to qualify as RA capacity.
- Requires this market-enhancement occurs by the CPUC ensuring:
- Aggregated distributed capacity resources can count toward local, system, or flexible RA requirements.
- Aggregated distributed capacity resources receive full RA credit for their entire capacity, including energy they export to the grid beyond the customer’s meter.
- Aggregated distributed capacity resources that meet reasonable and standardized technical requirements, as specified, can be settled using device-level data rather than requiring a traditional revenue-grade utility meter at each location.
- The CPUC's capacity counting methodologies must be compatible with device-level measurement, credit both load reductions and energy exports at any hour of the day, fully integrate ADERs into existing RA structures, and allow aggregated distributed capacity resources to mix different types of devices and technologies.
- Multiple devices can participate behind the same utility meter, including in separate programs simultaneously, as long as the same load reduction or energy export is not compensated twice.
- Customer data privacy must be protected consistent with state law, and enrollment processes must follow industry best practices, including those developed for the 2025 Demand Side Grid Support Program, to lower barriers to participation.
- Where feasible, capacity determinations must be technology-neutral, based on actual measured performance, and adjusted for weather, so the widest range of devices can qualify. The aggregated distributed capacity resource provider bears responsibility for ensuring it can deliver its promised load reduction or energy supply when called upon.
- Aggregated distributed capacity resources must be able to participate in the CAISO existing market participation models, as those models may be updated pursuant to the bill.
- Requires the CPUC to set rules under which customer-sited devices can export energy to the grid as part of an aggregated distributed capacity resource, with the goal of maximizing grid benefits while ensuring that customers on net energy metering or net billing tariffs are not paid twice for the same exported energy (once through the demand response program and again through their retail bill credits).
- Requires the CPUC to allow load-serving entities (LSEs) – i.e., electrical corporations, electric service providers (ESPs), and community choice aggregators (CCAs) – to include aggregated distributed capacity resources in RA filings and CPUC-ordered procurement. Requires the CPUC to ensure specified program rules to effectuate this inclusion.
- Requires the CPUC, on or before June 30, 2027, to develop recommendations for changes to the CAISO’s proxy demand resource and the DER aggregation participation models to be consistent with the CPUC’s requirements for aggregated distributed capacity resources pursuant to these provisions, and to request that the CAISO implement these changes in a new or existing initiative.
- Defines “aggregated distributed capacity resource” as one or more distributed resources capable of supplying electricity to, or reducing demand on, the electrical distribution system. Explicitly excludes customers participating in a net metering tariff under the first and second net metering rules and fuel cell net metering rules adopted by the CPUC.
- Makes several findings and declarations concerning the role of DERs to provide capacity value to satisfy RA requirements.
EXISTING LAW:
- Requires the CAISO, as a nonprofit, public benefit corporation, to conduct its operations consistent with applicable state and federal laws and consistent with the interests of the people of the state. (Public Utilities Code § 345.5)
- Requires the CAISO to ensure the efficient use and reliable operation of the transmission grid, as provided. (Public Utilities Code § 345)
- Requires the CPUC, in consultation with the CAISO, to establish RA requirements for all LSEs and requires the CPUC in establishing those requirements to ensure the reliability of electrical service in California. Requires that the RA program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified. Defines LSE, for that purpose, as an electrical corporation, ESP, or CCA. (Public Utilities Code § 380)
- Defines “distributed resources” to mean distributed renewable generation resources, energy efficiency, energy storage, electric vehicles, and demand response technologies. (Public Utilities Code § 769)
- Creates the Demand Side Grid Support (DSGS) Program and requires the State Energy Resources Conservation and Development Commission (i.e., the CEC) to implement and administer the program to incentivize dispatchable customer load reduction and backup generation operation as on-call emergency supply and load reduction for the state’s electrical grid during extreme events. (Public Resources Code § 25792)
FISCAL EFFECT: According to the Senate Committee on Appropriations, this bill will result in ongoing costs, potentially in the millions of dollars annually in ratepayer funds to pay for the CPUC to implement the bill.
BACKGROUND:
California’s RA Program – Following the 2000–2001 California electricity crisis, the Legislature adopted reforms to reduce the risk of capacity shortfalls, reliability events, including rotating shortages, and insufficient procurement of generating capacity. AB 380 (Núñez, Chapter 367, Statutes of 2005) established the state’s RA program and added Public Utilities Code Section 380, which directs the CPUC to establish procurement requirements and compliance rules for all LSEs, while the CAISO evaluates system and local reliability needs and determines if procured resources are sufficient to maintain grid reliability.[1]
LSEs – entities that supply electricity to customers – must purchase more power capacity than they expect to need (a “reserve margin”) for the busiest time (“peak demand”), so there's always a buffer of extra resources ready if demand spikes or something goes wrong. The RA program is the compliance and enforcement program to ensure this adequate supply is always maintained. LSEs demonstrate compliance through annual and monthly filings, showing that their capacity is deliverable to areas with reliability needs. Resources are compensated for being available to provide electricity when called upon, namely during times of system stress, rather than for the actual production of energy. This is the core concept in the RA program of “deliverability.”
RA Requirements and Compliance – The current RA program consists of system, local, and flexible requirements for each month of a compliance year. System requirements are determined for each LSE based on the CEC’s electricity demand forecast plus an 18% planning reserve margin established by the CPUC.[2] Local requirements are based on annual studies conducted by the CAISO to ensure sufficient capacity is available in transmission-constrained areas under reliability scenarios, including a one-in-ten-year weather assumption and N-1-1 contingency conditions.[3] Flexible RA requirements are based on an annual study by the CAISO that identifies the largest three-hour ramp in each month and are intended to ensure sufficient flexible capacity is available to run the system reliably.[4]
In October, LSEs must demonstrate that they have procured 90% of their system RA obligations for the five summer months (May-September) of the following year. They must also show 100% of their local requirements, and 90% of their flexible requirements for each month of the compliance year. There is an additional monthly reporting requirement for RA, where LSEs must demonstrate they have procured 100% of their monthly compliance across system and flexible RA obligations.
Slice-of-Day Framework – The CPUC has shifted the RA program away from a monthly peak approach and toward a slice-of-day (SOD) framework that evaluates if sufficient capacity is available in each hour of need. In 2021, the CPUC determined that this approach better reflects evolving grid conditions, including increased renewable penetration, shifting load profiles, and the growing role of energy storage.[5] Implementation began in 2023, with 2024 serving as a test year and 2025 as the first compliance year.[6] Under SOD, LSEs must demonstrate they have procured sufficient capacity to meet hourly demand plus a planning reserve margin (approximately 17%), evaluated for each hour of the most stressed day in each month.
RA Compensation – Resources used to meet an LSE’s RA requirement are compensated for the ability to call on the resource when needed, known as a “must-offer obligation.” A resource that commits to providing RA undertakes the “must-offer obligation” to bid or self-schedule its capacity into the CAISO wholesale market, ensuring capacity is available for system reliability. When generators contract with LSEs to provide RA, they must make their capacity available or face penalties. The actual dispatch of resources to meet load in real-time is performed on an economic basis, with the lowest cost resources committed first. As such, RA resources must be offered into the wholesale market, but they may not be dispatched to serve load if there are less expensive resource bids available (including non-RA resources).
The RA program provides an additional source of revenue beyond just actual energy sales. To qualify to sell RA, a resource type must first be assigned a qualifying capacity (QC) from the CPUC, which represents a resource’s maximum capacity eligible to be counted towards meeting its RA. The resource must then register with the CAISO and be tested to determine if it is “deliverable” to load when the transmission system is stressed by high demand. Following the deliverability assessment, each resource is assigned a net qualifying capacity (“NQC”) value, which defines the amount of RA that it can sell. For intermittent resources like wind and solar, the NQC value is typically well below the nameplate capacity of the facility. Demand response and energy storage resources are eligible to provide RA value, while energy efficiency is generally subtracted from the load forecast. In the case of behind-the-meter energy storage resources, they do not receive value for their exports to the grid.
DERs in RA – As the volume and variety of DERs has grown – spanning rooftop solar, battery storage, electric vehicles (EVs), smart thermostats, and other load-modifying technologies – stakeholders have increasingly pressed both the CPUC and CAISO to better accommodate these resources in the wholesale market, including by recognizing the full capacity value of behind-the-meter resources and their exported energy. While CAISO tariffs already permit DER aggregations to participate in its markets, the question of full capacity credit for behind-the-meter resources and aggregations has remained an active and unresolved issue at both the CPUC and CAISO for years.
The CPUC currently has an open proceeding[7] that is examining enhancements to demand response programs, including valuation methodologies, CAISO market integration, and RA credit for these resources. In parallel, CAISO launched its Demand and Distributed Energy Market Integration (DDEMI) Working Group in February 2025[8] to develop or refine participation models and market rules for demand-side and distributed resources, whether participating independently or through managed aggregation. That initiative produced a Discussion Paper on November 26, 2025,[9] which is now helping to shape CAISO’s priorities on several issues directly relevant to this bill, including the capacity value of behind-the-meter battery storage exports and aggregated DERs more broadly.
COMMENTS:
- Author’s Statement. According to the author, “Californians are struggling with rising electricity bills, and we need to use our grid more intelligently and cost-effectively. Instead of always building expensive new infrastructure to meet just a few peak hours of demand, we should be making better use of the resources we already have in our homes. Millions of Californians already have tools like smart thermostats, home batteries, and electric vehicles that can help support the grid. SB 913 ensures we can use those resources to lower costs, reduce pollution, and improve reliability.”
- Purpose of Bill. The author and supporters of this bill argue that behind-the-meter DERs and aggregated resources face structural disadvantages in the RA market, pointing to CPUC and CAISO rules that limit their ability to compete on equal footing with conventional energy resources. They view this bill as necessary to unlock the full grid value of these resources and reduce costs for all customers. Supporters point to the CEC's Demand Side Grid Support (DSGS) Program – which has enrolled 1,000 MW of DERs to reduce customer load during extreme events – as proof of concept, while noting that state budget funding for the program is uncertain going forward. They argue that the continued growth of EVs and battery storage represents significant untapped potential: of California's 2.5 million EVs, only around 25,000 are enrolled in managed charging programs, and devices like smart thermostats and electric panels offer further opportunities to reduce consumption when grid stress peaks. Aggregating these loads, supporters contend, could meaningfully reduce strain on the electric grid during high-demand periods.
Underlying these arguments is a practical financing concern: without a clear pathway to earn RA credit, and the revenue that comes with it, aggregators and DER providers may struggle to build viable business models around these resources, limiting deployment and participation well below what the grid could otherwise support. By establishing RA credit eligibility for aggregated distributed capacity resources, this bill aims to provide a market-based funding mechanism that does not depend on continued state budget appropriations.
- High Specificity. This bill prescribes with significant specificity what the CPUC and CAISO must do, how they must do it, and by when – directing both to adopt enhancements to existing rules governing capacity value for DERs. The proposed requirements span energy export credit for behind-the-meter battery storage, DER aggregation, multiple device and program enrollments behind a single customer meter, device-level telemetry for settlement, and streamlined customer enrollment processes. While recent amendments limit these provisions to non-NEM resources, the level of prescription raises questions about whether the Legislature should be locking in technical and market design specifics that are more appropriately resolved through the CPUC and CAISO's existing proceedings where tradeoffs with other programs, compensation structures, and market rules can be evaluated deliberatively. Supporters counter that without legislative direction, these proceedings risk producing little meaningful progress.
Several of the bill's specific requirements, however, warrant scrutiny. The mandate to provide full capacity credit during any hour of the day, for example, does not account for the degree to which these resources can reliably deliver during the hours that matter most to grid reliability, and the specifics of the new RA Slice of Day rules. Extending RA credit without a commensurate showing of actual performance could overstate the contribution of these resources to system RA. Similarly, the authorization of device-level telemetry for settlement in lieu of revenue-grade metering may be technically premature: CAISO's March 2026 Straw Proposal explicitly declined to move from service account-level to device-level registration, noting that no other regional grid operator currently maintains such an approach and that doing so would introduce significant data-sharing challenges with utilities and require fundamental changes to demand response registration systems. Taken together, these provisions reflect a degree of specificity that, while responsive to stakeholder priorities, may prove operationally difficult to implement and could confer benefits to DERs that are not yet fully warranted by demonstrated performance.
- Does Device-Level Deliver Grid Benefits? The bill’s authorization of device-level telemetry for settlement purposes raises a more fundamental concern than simply whether the technical capability exists to support it: the meter that matters to the grid is the utility meter, not the device meter. Grid operators and utilities are concerned with net load at the point of interconnection (the home service meter) and device-level measurements, while potentially a sufficient proxy, risk overstating the grid benefit actually delivered.
When a device is curtailed, such as a home air conditioning unit, occupants can respond in ways that load other devices: an HVAC system may be cycled down during a peak event while the occupant, feeling warm, runs a fan or opens the refrigerator repeatedly. The device meter records the curtailment; the utility meter tells a different story. While the load added by a ceiling fan or refrigerator is modest compared to the HVAC reduction, the point is not that the net benefit disappears — it is that the program, measuring at the device-level, pays for the full curtailment while delivering something less, and at the scale of thousands of enrolled households, that gap between measured device performance and actual grid relief becomes material.
Moreover, device-level measurements can miss load shifting within the home, which may become more pronounced if customers enroll their individual devices in separate demand response programs. For instance, moving an EV charge from 6 pm to midnight looks clean in device-level data, but if other flexible loads were already running at midnight, or get displaced into the pre-peak window, the net grid signal is diminished or reversed. The device did what the individual program asked; the home didn't.
When compensation is tied to a device-level baseline (a counterfactual of what that device would have consumed absent the event), but the home net impact is materially smaller, the program is effectively paying for grid relief that was not fully delivered. At scale, this creates a reliability problem, not merely an accounting one: utilities could end up procuring capacity on paper that does not exist in practice. The degree of masking varies by device type, occupant behavior, and dwelling, but the general principle holds: the program would be measuring the signal closest to the intervention, not the outcome we care about. The more prudent approach may be to settle on whole-home net load change, which is what the grid actually experiences. This bill’s preference for device telemetry, without requiring a showing that device-level measurement reliably approximates home grid impact, risks embedding a systematic overestimation of DER capacity into the RA program. Therefore, the committee recommends amendments to specify the device-level telemetry requirements in the bill are only applicable to the extent the CPUC determines such devices provide an accurate measurement of the load changes the grid experienced. The committee also recommends striking “without the need for a revenue grade meter” in 380.1 (a)(3) to allow the CPUC flexibility in determining whether device-level measurements can sufficiently provide accurate grid response data on their own or as a complement to the meter data.
- Changing Program Rules. This bill makes a number of core RA program rule changes that raise concern; specifically, the requirement that the eligible DERs receive RA credit for their “full” capacity value and the requirement that the RA counting conventions credit DERs “during any hour of the day.” Both of these requirements would compensate DERs much more generously than current RA program rules allow for any other resource type. In the context of CPUC’s recently adopted Slice of Day (SOD) RA framework, capacity is counted and procured across distinct time periods that reflect when the grid actually needs reliable capacity, not uniformly across all hours. Mandating that aggregated distributed capacity resources receive full capacity credit regardless of the hour they deliver is not only inconsistent with these existing counting conventions, but would effectively exempt these resources from the same performance-based scrutiny applied to all other RA resources. A behind-the-meter battery that discharges at 2 am, for instance, provides little or no reliability benefit during the evening peak hours that SOD is designed to secure, yet under this bill’s framework could receive the same capacity credit as a resource that reliably performs when the grid is under stress. The result would be an inflation of the paper RA contribution of these resources well beyond their actual reliability value. The author notes this is not the intent of these provisions. The committee recommends striking the use of “full” in 380.1(a)(2) and instead using “qualifying;” and rephrasing the “any hour of the day” clause in 380.1(a)(4) to be “during the specific hour of the day required for RA showings.”
- CPUC Flexibility. The bill's directives to the CPUC – requiring it to allow aggregated distributed capacity resources in RA filings and commission-ordered procurement, and to ensure procurement requirements provide "reasonable flexibility" to accommodate these resources – are framed less like authorizations and more like mandates. (i.e., the CPUC “shall allow LSEs to include these resources in RA” in 380.1 (c)) While the bill includes language about flexibility and cost-effectiveness, it does not provide the CPUC sufficient discretion to condition aggregated distributed capacity resource eligibility on a demonstrated showing that these resources actually meet the reliability attributes that RA and other CPUC-directed procurement is designed to secure. The CPUC should retain the authority to determine whether a given DER, or class of aggregated DERs, can reliably deliver the capacity it claims before that resource is counted toward an LSE’s RA obligation or included in a procurement order. Without that gatekeeping, the bill risks directing the CPUC to accommodate these resources in RA regardless of whether they perform as expected. The committee therefore recommends amendments to clarify that these aggregated resources are eligible for RA credit and commission-ordered procurement only to the extent the CPUC determines they meet the performance criteria, reliability attributes, or other requirements of the applicable RA program or procurement order.
- Additional Amendments. The committee recommends additional amendments to the bill that strike overstated or speculative findings; rename the resources as aggregated distributed energy, rather than “capacity,” resources; and make other technical or clarifying corrections throughout.
- Related Legislation.
AB 2266 (Schultz) requires the CPUC, and after January 1, 2030, when setting certain resource procurement obligations for LSEs, to use the same capacity valuation method to assess the reliability contribution of each resource type. Status: pending hearing in the Senate Committee on Appropriations.
SB 1138 (Padilla) requires the CPUC to allow LSEs to satisfy 25% of their RA requirements by trading energy capacity with other LSEs. Status: pending hearing in the Assembly Committee on Appropriations after passage in this committee on June 10, 2026, on an 18-0 vote.
- Prior Legislation.
AB 740 (Harabedian, 2025) would have required the CEC, in the next update to the biennial integrated energy policy report after January 1, 2027, and subject to available funding, to adopt a virtual power plant deployment plan. Status: Vetoed.
AB 44 (Schultz, 2025) would have required the CEC, on or before December 1, 2026, and in consultation with LSEs and resource aggregators, to define and publicize methodologies for load modification protocols by which a LSE may reduce or modify its electrical demand forecast upon aggregated system operation of behind-the-meter load modifying technologies and programmatic measures deemed to reliably reduce or modify the LSE’s electrical demand. Status: Vetoed.
SB 541 (Becker, 2025) would have required the CEC, in consultation with specified entities, to analyze the cost-effectiveness of specific load flexibility programs and other types of load-shifting interventions and identify both the approximate amount of load shifting and the cost-effectiveness of each type of load-shifting intervention in the next update to the biennial integrated energy policy report after January 1, 2027, as provided. Status: Vetoed.
REGISTERED SUPPORT / OPPOSITION:
Support
350 Bay Area Action
Active San Gabriel Valley
Advanced Energy United
Affordable Energy Campaign
Ava Community Energy
Ava Community Energy Authority
Brightline Defense
California Alliance for Community Energy
California Coalition of Large Energy Users
California Efficiency + Demand Management Council
California Environmental Justice Alliance (CEJA) Action
California Solar & Storage Association
CalPIRG
Center for Biological Diversity
Center for Community Energy
Center for Environmental Health
Ceres
Clean Coalition
Cleanearth4kids.org
Climate Action Campaign
Climate Center; the
Climate Health Now Action Fund
Community Environmental Council
Deploy Action
Derapi
Environment California
Environmental Defense Fund
Environmental Protection Information Center
Ev.energy
Friends Committee on Legislation of California
Generac Power Systems INC.
Immaculate Heart Community Environmental Commission
Leap
Local Clean Energy Alliance
Local Government Sustainable Energy Coalition
Nextgen California
Pesticide Action and Agroecology Network
Qcells
Reclaim Our Power: Utility Justice Campaign
Renew Home
San Francisco Bay Physicians for Social Responsibility
San Jose Clean Energy
Santa Cruz Climate Action Network
Sierra Club California
Silicon Valley Youth Climate Action
Solar United Neighbors Action
Sunrun
Tesla INC.
The Climate Center
The Climate Reality Project, Los Angeles Chapter
The Climate Reality Project, San Fernando Valley CA Chapter
The Energy Coalition
Uniting the Central Coast for Action
Usgbc California
Voltus, INC.
Vote Solar
Support If Amended
350 Humboldt
Climate Action California
Oppose
Coalition of California Utility Employees
Independent Energy Producers Association
Oppose Unless Amended
Pacific Gas and Electric Company
Analysis Prepared by: Laura Shybut / U. & E. / (916) 319-2083
Public Utilities Code § 380 (a) (1) ↑
pg. 5, CPUC, “2026 Resource Adequacy and Slice of Day Guide,” September 23, 2025, https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/resource-adequacy-homepage/resource-adequacy-compliance-materials/guides-and-resources/2026-ra-slice-of-day-filing-guide.pdf ↑
N-1-1 Contingency: A sequence of events consisting of the initial loss of a single generator or transmission component (Primary Contingency), followed by system adjustments, followed by another loss of a single generator, or transmission component (Secondary Contingency). ↑
CPUC; “2026 Resource Adequacy and Slice of Day Guide”; pp. 9 (Table 1); Issued September 23, 2025 ↑
CPUC, Decision Requiring Procurement to Address Mid-Term Reliability (2023–2026), Decision 21-06-035; Adopted June 24, 2021; https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M389/K603/389603637.PDF ↑
CPUC, Decision Adopting Local Capacity Obligations for 2024–2026, Flexible Capacity Obligations for 2024, and Reform Track Framework, Decision 23-06-029; Adopted June 29, 2023; https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M511/K140/511140071.PDF ↑
R. 25-09-004, Scoping Memo dated February 12, 2026 ↑
https://stakeholdercenter.caiso.com/StakeholderInitiatives/Demand-Distributed-Energy-Market-Integration ↑
https://stakeholdercenter.caiso.com/InitiativeDocuments/Discussion-Paper-Demand-and-Distributed-Energy-Market-Integration-Nov-26-2025.pdf ↑
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 913 |
THIRD READING
Bill No: SB 913
Author: Becker (D), et al.
Amended: 5/14/26
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 15-0, 4/7/26
AYES: Allen, Ochoa Bogh, Archuleta, Arreguín, Becker, Caballero, Gonzalez, Hurtado, McNerney, Reyes, Richardson, Rubio, Stern, Strickland, Wahab
NO VOTE RECORDED: Dahle, Grove
SENATE APPROPRIATIONS COMMITTEE: 5-0, 5/14/26
AYES: Cervantes, Cabaldon, Grayson, Richardson, Wahab
NO VOTE RECORDED: Seyarto, Dahle
SUBJECT: Resource adequacy: aggregated distributed capacity resources
SOURCE: Environment California
The Climate Center
DIGEST:
This bill proposes several policy changes to authorize and expand the use of aggregated distributed energy resources (DERs) to satisfy resource adequacy (RA) requirements.
ANALYSIS:
Existing law:
- Establishes and vests the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires the California Independent System Operator (CAISO), as a nonprofit, public benefit corporation, to conduct its operations consistent with applicable state and federal laws and consistent with the interests of the people of the state. (Public Utilities Code §345.5)
- Requires the CAISO to ensure the efficient use and reliable operation of the transmission grid, as provided. (Public Utilities Code §345)
- Requires the CPUC, in consultation with the CAISO, to establish RA requirements for all load-serving entities (LSEs) and requires the CPUC in establishing those requirements to ensure the reliability of electrical service in California. Requires the RA program to facilitate the development of new generating, non-generating, hybrid capacity and retention of existing generating, non-generating, and hybrid capacity that is economical and needed for reliability. Requires that the RA program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified. Defines LSE, for that purpose, as an electrical corporation, electric service provider (ESP), or community choice aggregator (CCA). (Public Utilities Code §380)
- Defines “distributed resources” to mean distributed renewable generation resources, energy efficiency, energy storage, electric vehicles, and demand response technologies. (Public Utilities Code §769)
- Creates the Demand Side Grid Support (DSGS) Program and requires the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) to implement and administer the program to incentivize dispatchable customer load reduction and backup generation operation as on-call emergency supply and load reduction for the state’s electrical grid during extreme events. (Public Resources Code §25792)
This bill:
- Makes several findings and declarations concerning the role of DERs to provide capacity value to satisfy RA requirements.
- Requires the CPUC, in coordination with the CEC and the CAISO, on or before June 30, 2027, to enhance existing market-integrated pathways for aggregated distributed capacity resources, as defined, to qualify as RA capacity.
- Requires the CPUC to allow electrical corporations, ESPs, and CCAs to include aggregated distributed capacity resources in RA filings and CPUC-ordered procurement.
- Requires the CPUC, on or before June 30, 2027, to develop recommendations for changes to the CAISO’s proxy demand resource and the DER aggregation participation models to be consistent with the CPUC’s requirements for aggregated distributed capacity resources pursuant to these provisions, and to request that the CAISO implement these changes in a new or existing initiative.
Background
Resource adequacy (RA). Following the California energy crisis of 2000-01, the California Legislature enacted legislation to prevent future incidents of widespread blackouts and rolling brownouts due to lack of electric generating capacity. Among the reforms adopted in response to the crisis was the adoption of Public Utilities Code §380 as an effort to better ensure reliability of electric supply. The statute directs the CPUC, in consultation with the CAISO, to establish RA requirements for all LSEs, including electric investor-owned utilities (IOUs), ESPs, and now includes CCAs, which did not exist at the time of the crisis.
The current RA program consists of system, local, and flexible requirements for each month of a compliance year. There are two types of filings: Annual filings (filed on or around October 31st) and Monthly filings (filed 45 calendar days prior to the compliance month). For the monthly filings, LSEs must demonstrate they have procured 100% of their monthly System and Flexible RA obligation. For the Annual filings, in October of each year, LSEs must demonstrate that they have procured 90% of their system RA obligations for the five summer months (May-September) of the following year, as well as 100% of their local requirements, and 90% of their flexible requirements for each month of the coming compliance year. The CPUC has adopted changes to RA program in recent years, including increasing the planning reserve margin from 15% to 17% by 2024 for all LSEs and in the case of electric IOUs upwards of 20-22% effective planning reserve margin. The CPUC has required a multi-year local capacity RA requirement and adopted local capacity requirements for the upcoming three years. The CAISO conducts a Local Capacity Technical Analysis to identify the minimum local resource capacity required in each local area to meet energy needs used a 1-in-10 weather year and N-1-1(emergency) contingency. The CPUC also assesses penalties on the LSEs who fail to satisfy their RA obligations, including limiting the expansion of CCAs if they are deficient in their RA requirements.
Slice-of-Day Framework. The CPUC is also amid a significant change to the RA program by implementing a slice-of-day framework that assesses the hourly use of resources. The CPUC has been developing the new structure for a few years and in 2025 implemented the first year of the slice-of-day framework. The CPUC adopted a 17% planning reserve margin for the slice-of-day framework, consistent with previous planning reserve margins, to procure enough RA to meet load obligations in each hour rather than monthly. Under the slice-of-day framework, LSEs receive a 24-hour obligation for each of the 12 months of the year. The new RA framework requires that resources, including energy storage resources, demonstrate their ability to provide capacity during specific, critical hours rather than just a daily peak.
RA Compensation. Resources used to meet an LSE’s RA requirement are compensated for the ability to call on the resource when needed, known as a “must-offer obligation.” A resource that commits to providing RA undertakes the “must-offer obligation” to bid or self-schedule its capacity into the CAISO wholesale market, ensuring capacity is available for system reliability. When generators contract with LSEs to provide RA, they must make their capacity available or face penalties. The actual dispatch of resources to meet load in real-time is performed on an economic basis, with the lowest cost resources committed first. As such, RA resources must be offered into the wholesale market, but they may not be dispatched to serve load if there are less expensive resource bids available (including non-RA resources). The RA program provides an additional source of revenue beyond just actual energy sales. To qualify to sell RA, a resource type must first be assigned a qualifying capacity (QC) from the CPUC, which represents a resource’s maximum capacity eligible to be counted towards meeting its RA. The resource must then register with the CAISO and be tested to determine if it is “deliverable” to load when the transmission system is stressed by high demand. Following the deliverability assessment, each resource is assigned a net qualifying capacity (“NQC”) value, which defines the amount of RA that it can sell. For intermittent resources like wind and solar, the NQC value is typically well below the nameplate capacity of the facility. Demand response and energy storage resources are eligible to provide RA value, while energy efficiency is generally subtracted from the load forecast. In the case of behind-the-meter energy storage resources, they do not receive value for their exports to the grid.
Comments
Need for this bill. According to the author:
Californians are struggling with rising electricity bills, and we need to use our grid more intelligently and cost-effectively. Instead of always building expensive new infrastructure to meet just a few peak hours of demand, we should be making better use of the resources we already have in our homes. Millions of Californians already have tools like smart thermostats, home batteries, and electric vehicles that can help support the grid. SB 913 ensures we can use those resources to lower costs, reduce pollution, and improve reliability.
Supporters frustrated by the value of DERs and aggregated resources within the RA market. The supporters of this bill express frustrations that behind-the-meter DERs and aggregated resources are not able to compete fairly within the RA market. They contend that a myriad of existing rules at the CPUC and CAISO diminish the value of these resources to participate more fully in the wholesale market compared to other energy resources. They believe this bill is necessary to level the playing field and ensure these resources can provide their full benefit to the electrical system and as such help reduce costs for all customers. They point to the success of the CEC’s DSGS program which has enrolled 1000 megawatts of DERs to participate in the program. The DSGS Program provides incentives to reduce customer net load during extreme events with upfront capacity commitments and for per-unit reductions in net load. The DSGS Program has been funded through the State Budget, however, the opportunity for future funds is less certain. The supporters contend that the continued growth of battery energy storage systems and electric vehicles, for example, presents an opportunity to aggregate these loads and help reduce consumption during peak periods, thereby reducing the strain on the electric grid. They view these resources as untapped potential, noting that of the 2.5 million electric vehicles in California today, only around 25,000 are on managed charging programs, and that smart thermostats and smart electric panels add to the ability to reduce consumption when wholesale market prices skyrocket.
Various efforts to re-examine the value of energy storage and DERs, including aggregations, for RA. As noted above, both the CPUC and CAISO have important roles in developing the RA program and the values of the various energy resources used in the program. As DERs volume has grown and types have expanded, including solar, energy storage, electric vehicles, and others load-modifying resources (including the aggregation of thermostats) there is growing demand by stakeholders to better optimize their participation in the wholesale market by modifying load and to receive capacity value for their exported energy. The CAISO tariffs allow aggregations of DERs to participate in its markets. However, the issue of the full capacity value for behind-the-meter DERs and aggregation has continued to be pressed by stakeholders at the CPUC and CAISO for many years.
The CPUC has an open proceeding (R. 25-09-004, Scoping Memo dated February 12, 2026) which considers additional enhancements to demand response programs, including revisiting valuation methodologies, CAISO market integration topics, and RA valuation. Additionally, the CAISO also has a current working group, Demand and Distributed Energy Market Integration Working Group, that is actively discussing enhancements to, or development of, participation models and market rules facilitating the representation of demand and distributed energy, either independently or managed aggregation, in the CAISO wholesale markets. CAISO demand and distributed energy market integration initiative was launched in February 2025 and issued a Discussion Paper on November 26, 2025, which is now helping to shape priorities for these issues, including the value of behind-the-meter energy storage exports, value of aggregated DERs, and other related issues raised in this bill.
Bill seeks specific outcomes. This bill proposes to prescribe the what, how, and by when the CPUC and CAISO must adopt enhancements to existing rules in order to achieve the supporters’ goals to attain greater capacity value for these resources within the RA program. The proposed requirements include value for energy exports from energy battery storage, aggregation of these resources, multiple devices and multiple enrollments behind the same customer meter, using device telemetry, and customer enrollments that require utility login or other barriers. However, recent amendments limit these to non-NEM resources. These requirements are better addressed within the CPUC and CAISO proceedings and initiatives, particularly as they may need to address how they may affect other program participation and compensation. However, the supporters of this bill find waiting for changes may result in little progress absent a bill to push the discussions and effort towards their desired outcomes. In some cases, the technical feasibility of the prescribed requirements may be premature, and infeasible. For example, the CAISO in a March 2026 Straw Proposal noted that they are not proposing to move from service account-level registration to customer device-level registration at this time. They note that no other ISO/RTO currently maintains device-level registration and such an approach would introduce challenges with data-sharing arrangements with utilities and changes to demand response registrations.
Related/Prior Legislation
SB 1138 (Padilla) of 2026, requires the CPUC to allow LSEs to satisfy 25% of their RA requirements by trading energy capacity with other LSEs. The bill is pending in the Senate.
AB 740 (Harabedian) of 2025, would have required the CEC, in the next update to the biennial integrated energy policy report after January 1, 2027, and subject to available funding, to adopt a virtual power plant deployment plan. The bill was vetoed.
AB 44 (Schultz) of 2025, would have required the CEC, on or before December 1, 2026, and in consultation with LSEs and resource aggregators, to define and publicize methodologies for load modification protocols by which a LSE may reduce or modify its electrical demand forecast upon aggregated system operation of behind-the-meter load modifying technologies and programmatic measures deemed to reliably reduce or modify the LSE’s electrical demand. The bill was vetoed.
SB 541 (Becker) of 2025, would have required the CEC, in consultation with specified entities, to analyze the cost-effectiveness of specific load flexibility programs and other types of load-shifting interventions and identify both the approximate amount of load shifting and the cost-effectiveness of each type of load-shifting intervention in the next update to the biennial integrated energy policy report after January 1, 2027, as provided. The bill was vetoed.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee:
- Unknown ongoing costs, potentially in the millions of dollars annually (ratepayer funds), for the California Public Utilities Commission (CPUC) to establish new Qualifying Capacity methodologies, update formal proceedings, establish device-level measurement protocols and technical standards, enforce participation rules and verification mechanisms, coordinate with the California Independent Systems Operator (CAISO) to align participation models, modernize data infrastructure, and otherwise implement the provisions of this bill.
- The California Energy Commission (CEC) anticipates any costs would be minor and absorbable.
SUPPORT: (Verified 5/14/26)
Environment California (Co-Sponsor)
The Climate Center (Co-Sponsor)
350 Bay Area Action
350 Humboldt
Active San Gabriel Valley
Advanced Energy United
Ava Community Energy
California Alliance for Community Energy
California Efficiency + Demand Management Council
California Public Interest Research Group
California Solar & Storage Association
Center for Biological Diversity
Center for Community Energy
Center for Environmental Health
Ceres
City of Mountain View
Clean Coalition
CleanEarth4Kids.org
Climate Action California
Climate Action Campaign
Climate Health Now Action Fund
Community Environmental Council
Deploy Action
Derapi
Environmental Defense Fund
Environmental Protection Information Center
Environmental Working Group
ev.energy
Friends Committee on Legislation of California
Generac Power Systems
Immaculate Heart Community Environmental Commission
Leap
Local Clean Energy Alliance
Local Government Sustainable Energy Coalition
NextGen California
Pesticide Action and Agroecology Network
Qcells
Reclaim Our Power: Utility Justice Campaign
Renew Homes
Santa Cruz Climate Action Network
Sierra Club California
Silicon Valley Youth Climate Action
Solar Energy Industries Association
Solar United Neighbors Action
Tesla, Inc.
The Energy Coalition
Uniting the Central Coast for Action
U.S. Green Building Council California
Voltus, Inc.
Vote Solar
OPPOSITION: (Verified 5/14/26)
Coalition of California Utility Employees
Independent Energy Producers Association
Two Individuals
ARGUMENTS IN SUPPORT: According to the California Solar and Storage Association:
DERs are currently eligible to provide Resource Adequacy, but several rules prohibit them from providing their full capacity. In particular, DERs currently do not receive any credit for energy that is exported past the customer’s utility meter onto the distribution system, significantly capping the potential for these resources to provide peak capacity when California’s grid needs it the most. Consequently, this rule and several others have limited DERs’ ability to provide Resource Adequacy as an additional resource that is available to utilities. …This bill would put DERs on equal footing with large resources and allow them to compete and be called upon when they are a cost-effective resource. This will help put downward pressure on rates as it lowers the cost that load-serving entities pay for Resource Adequacy, and it will be a source of clean peak capacity.
ARGUMENTS IN OPPOSITION: According to the Coalition of California Utility Employees:
…there is no guarantee that that the DERs would actually provide resource adequacy. Allowing DERs to count for full resource adequacy credit is problematic if the DERs are not operated or controlled by the IOUs. There is no way to control third-party operation of them and imposing a penalty if the capacity is not delivered is not enough. History shows that penalties are just a part of doing business. This bill would count a DER as capacity even though it might not be available to a load serving entity to benefit the grid because it’s being used to benefit the private interest of the customer.
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
5/20/26 13:31:02
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-4171 | SB 913 |
THIRD READING
Bill No: SB 913
Author: Becker (D), et al.
Amended: 5/14/26
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 15-0, 4/7/26
AYES: Allen, Ochoa Bogh, Archuleta, Arreguín, Becker, Caballero, Gonzalez, Hurtado, McNerney, Reyes, Richardson, Rubio, Stern, Strickland, Wahab
NO VOTE RECORDED: Dahle, Grove
SENATE APPROPRIATIONS COMMITTEE: 5-0, 5/14/26
AYES: Cervantes, Cabaldon, Grayson, Richardson, Wahab
NO VOTE RECORDED: Seyarto, Dahle
SUBJECT: Resource adequacy: aggregated distributed capacity resources
SOURCE: Environment California
The Climate Center
DIGEST:
This bill proposes several policy changes to authorize and expand the use of aggregated distributed energy resources (DERs) to satisfy resource adequacy (RA) requirements.
ANALYSIS:
Existing law:
- Establishes and vests the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires the California Independent System Operator (CAISO), as a nonprofit, public benefit corporation, to conduct its operations consistent with applicable state and federal laws and consistent with the interests of the people of the state. (Public Utilities Code §345.5)
- Requires the CAISO to ensure the efficient use and reliable operation of the transmission grid, as provided. (Public Utilities Code §345)
- Requires the CPUC, in consultation with the CAISO, to establish RA requirements for all load-serving entities (LSEs) and requires the CPUC in establishing those requirements to ensure the reliability of electrical service in California. Requires the RA program to facilitate the development of new generating, non-generating, hybrid capacity and retention of existing generating, non-generating, and hybrid capacity that is economical and needed for reliability. Requires that the RA program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified. Defines LSE, for that purpose, as an electrical corporation, electric service provider (ESP), or community choice aggregator (CCA). (Public Utilities Code §380)
- Defines “distributed resources” to mean distributed renewable generation resources, energy efficiency, energy storage, electric vehicles, and demand response technologies. (Public Utilities Code §769)
- Creates the Demand Side Grid Support (DSGS) Program and requires the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) to implement and administer the program to incentivize dispatchable customer load reduction and backup generation operation as on-call emergency supply and load reduction for the state’s electrical grid during extreme events. (Public Resources Code §25792)
This bill:
- Makes several findings and declarations concerning the role of DERs to provide capacity value to satisfy RA requirements.
- Requires the CPUC, in coordination with the CEC and the CAISO, on or before June 30, 2027, to enhance existing market-integrated pathways for aggregated distributed capacity resources, as defined, to qualify as RA capacity.
- Requires the CPUC to allow electrical corporations, ESPs, and CCAs to include aggregated distributed capacity resources in RA filings and CPUC-ordered procurement.
- Requires the CPUC, on or before June 30, 2027, to develop recommendations for changes to the CAISO’s proxy demand resource and the DER aggregation participation models to be consistent with the CPUC’s requirements for aggregated distributed capacity resources pursuant to these provisions, and to request that the CAISO implement these changes in a new or existing initiative.
Background
Resource adequacy (RA). Following the California energy crisis of 2000-01, the California Legislature enacted legislation to prevent future incidents of widespread blackouts and rolling brownouts due to lack of electric generating capacity. Among the reforms adopted in response to the crisis was the adoption of Public Utilities Code §380 as an effort to better ensure reliability of electric supply. The statute directs the CPUC, in consultation with the CAISO, to establish RA requirements for all LSEs, including electric investor-owned utilities (IOUs), ESPs, and now includes CCAs, which did not exist at the time of the crisis.
The current RA program consists of system, local, and flexible requirements for each month of a compliance year. There are two types of filings: Annual filings (filed on or around October 31st) and Monthly filings (filed 45 calendar days prior to the compliance month). For the monthly filings, LSEs must demonstrate they have procured 100% of their monthly System and Flexible RA obligation. For the Annual filings, in October of each year, LSEs must demonstrate that they have procured 90% of their system RA obligations for the five summer months (May-September) of the following year, as well as 100% of their local requirements, and 90% of their flexible requirements for each month of the coming compliance year. The CPUC has adopted changes to RA program in recent years, including increasing the planning reserve margin from 15% to 17% by 2024 for all LSEs and in the case of electric IOUs upwards of 20-22% effective planning reserve margin. The CPUC has required a multi-year local capacity RA requirement and adopted local capacity requirements for the upcoming three years. The CAISO conducts a Local Capacity Technical Analysis to identify the minimum local resource capacity required in each local area to meet energy needs used a 1-in-10 weather year and N-1-1(emergency) contingency. The CPUC also assesses penalties on the LSEs who fail to satisfy their RA obligations, including limiting the expansion of CCAs if they are deficient in their RA requirements.
Slice-of-Day Framework. The CPUC is also amid a significant change to the RA program by implementing a slice-of-day framework that assesses the hourly use of resources. The CPUC has been developing the new structure for a few years and in 2025 implemented the first year of the slice-of-day framework. The CPUC adopted a 17% planning reserve margin for the slice-of-day framework, consistent with previous planning reserve margins, to procure enough RA to meet load obligations in each hour rather than monthly. Under the slice-of-day framework, LSEs receive a 24-hour obligation for each of the 12 months of the year. The new RA framework requires that resources, including energy storage resources, demonstrate their ability to provide capacity during specific, critical hours rather than just a daily peak.
RA Compensation. Resources used to meet an LSE’s RA requirement are compensated for the ability to call on the resource when needed, known as a “must-offer obligation.” A resource that commits to providing RA undertakes the “must-offer obligation” to bid or self-schedule its capacity into the CAISO wholesale market, ensuring capacity is available for system reliability. When generators contract with LSEs to provide RA, they must make their capacity available or face penalties. The actual dispatch of resources to meet load in real-time is performed on an economic basis, with the lowest cost resources committed first. As such, RA resources must be offered into the wholesale market, but they may not be dispatched to serve load if there are less expensive resource bids available (including non-RA resources). The RA program provides an additional source of revenue beyond just actual energy sales. To qualify to sell RA, a resource type must first be assigned a qualifying capacity (QC) from the CPUC, which represents a resource’s maximum capacity eligible to be counted towards meeting its RA. The resource must then register with the CAISO and be tested to determine if it is “deliverable” to load when the transmission system is stressed by high demand. Following the deliverability assessment, each resource is assigned a net qualifying capacity (“NQC”) value, which defines the amount of RA that it can sell. For intermittent resources like wind and solar, the NQC value is typically well below the nameplate capacity of the facility. Demand response and energy storage resources are eligible to provide RA value, while energy efficiency is generally subtracted from the load forecast. In the case of behind-the-meter energy storage resources, they do not receive value for their exports to the grid.
Comments
Need for this bill. According to the author:
Californians are struggling with rising electricity bills, and we need to use our grid more intelligently and cost-effectively. Instead of always building expensive new infrastructure to meet just a few peak hours of demand, we should be making better use of the resources we already have in our homes. Millions of Californians already have tools like smart thermostats, home batteries, and electric vehicles that can help support the grid. SB 913 ensures we can use those resources to lower costs, reduce pollution, and improve reliability.
Supporters frustrated by the value of DERs and aggregated resources within the RA market. The supporters of this bill express frustrations that behind-the-meter DERs and aggregated resources are not able to compete fairly within the RA market. They contend that a myriad of existing rules at the CPUC and CAISO diminish the value of these resources to participate more fully in the wholesale market compared to other energy resources. They believe this bill is necessary to level the playing field and ensure these resources can provide their full benefit to the electrical system and as such help reduce costs for all customers. They point to the success of the CEC’s DSGS program which has enrolled 1000 megawatts of DERs to participate in the program. The DSGS Program provides incentives to reduce customer net load during extreme events with upfront capacity commitments and for per-unit reductions in net load. The DSGS Program has been funded through the State Budget, however, the opportunity for future funds is less certain. The supporters contend that the continued growth of battery energy storage systems and electric vehicles, for example, presents an opportunity to aggregate these loads and help reduce consumption during peak periods, thereby reducing the strain on the electric grid. They view these resources as untapped potential, noting that of the 2.5 million electric vehicles in California today, only around 25,000 are on managed charging programs, and that smart thermostats and smart electric panels add to the ability to reduce consumption when wholesale market prices skyrocket.
Various efforts to re-examine the value of energy storage and DERs, including aggregations, for RA. As noted above, both the CPUC and CAISO have important roles in developing the RA program and the values of the various energy resources used in the program. As DERs volume has grown and types have expanded, including solar, energy storage, electric vehicles, and others load-modifying resources (including the aggregation of thermostats) there is growing demand by stakeholders to better optimize their participation in the wholesale market by modifying load and to receive capacity value for their exported energy. The CAISO tariffs allow aggregations of DERs to participate in its markets. However, the issue of the full capacity value for behind-the-meter DERs and aggregation has continued to be pressed by stakeholders at the CPUC and CAISO for many years.
The CPUC has an open proceeding (R. 25-09-004, Scoping Memo dated February 12, 2026) which considers additional enhancements to demand response programs, including revisiting valuation methodologies, CAISO market integration topics, and RA valuation. Additionally, the CAISO also has a current working group, Demand and Distributed Energy Market Integration Working Group, that is actively discussing enhancements to, or development of, participation models and market rules facilitating the representation of demand and distributed energy, either independently or managed aggregation, in the CAISO wholesale markets. CAISO demand and distributed energy market integration initiative was launched in February 2025 and issued a Discussion Paper on November 26, 2025, which is now helping to shape priorities for these issues, including the value of behind-the-meter energy storage exports, value of aggregated DERs, and other related issues raised in this bill.
Bill seeks specific outcomes. This bill proposes to prescribe the what, how, and by when the CPUC and CAISO must adopt enhancements to existing rules in order to achieve the supporters’ goals to attain greater capacity value for these resources within the RA program. The proposed requirements include value for energy exports from energy battery storage, aggregation of these resources, multiple devices and multiple enrollments behind the same customer meter, using device telemetry, and customer enrollments that require utility login or other barriers. However, recent amendments limit these to non-NEM resources. These requirements are better addressed within the CPUC and CAISO proceedings and initiatives, particularly as they may need to address how they may affect other program participation and compensation. However, the supporters of this bill find waiting for changes may result in little progress absent a bill to push the discussions and effort towards their desired outcomes. In some cases, the technical feasibility of the prescribed requirements may be premature, and infeasible. For example, the CAISO in a March 2026 Straw Proposal noted that they are not proposing to move from service account-level registration to customer device-level registration at this time. They note that no other ISO/RTO currently maintains device-level registration and such an approach would introduce challenges with data-sharing arrangements with utilities and changes to demand response registrations.
Related/Prior Legislation
SB 1138 (Padilla) of 2026, requires the CPUC to allow LSEs to satisfy 25% of their RA requirements by trading energy capacity with other LSEs. The bill is pending in the Senate.
AB 740 (Harabedian) of 2025, would have required the CEC, in the next update to the biennial integrated energy policy report after January 1, 2027, and subject to available funding, to adopt a virtual power plant deployment plan. The bill was vetoed.
AB 44 (Schultz) of 2025, would have required the CEC, on or before December 1, 2026, and in consultation with LSEs and resource aggregators, to define and publicize methodologies for load modification protocols by which a LSE may reduce or modify its electrical demand forecast upon aggregated system operation of behind-the-meter load modifying technologies and programmatic measures deemed to reliably reduce or modify the LSE’s electrical demand. The bill was vetoed.
SB 541 (Becker) of 2025, would have required the CEC, in consultation with specified entities, to analyze the cost-effectiveness of specific load flexibility programs and other types of load-shifting interventions and identify both the approximate amount of load shifting and the cost-effectiveness of each type of load-shifting intervention in the next update to the biennial integrated energy policy report after January 1, 2027, as provided. The bill was vetoed.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee:
- Unknown ongoing costs, potentially in the millions of dollars annually (ratepayer funds), for the California Public Utilities Commission (CPUC) to establish new Qualifying Capacity methodologies, update formal proceedings, establish device-level measurement protocols and technical standards, enforce participation rules and verification mechanisms, coordinate with the California Independent Systems Operator (CAISO) to align participation models, modernize data infrastructure, and otherwise implement the provisions of this bill.
- The California Energy Commission (CEC) anticipates any costs would be minor and absorbable.
SUPPORT: (Verified 5/14/26)
Environment California (Co-Sponsor)
The Climate Center (Co-Sponsor)
350 Bay Area Action
350 Humboldt
Active San Gabriel Valley
Advanced Energy United
Ava Community Energy
California Alliance for Community Energy
California Efficiency + Demand Management Council
California Public Interest Research Group
California Solar & Storage Association
Center for Biological Diversity
Center for Community Energy
Center for Environmental Health
Ceres
Clean Coalition
CleanEarth4Kids.org
Climate Action California
Climate Action Campaign
Climate Health Now Action Fund
Community Environmental Council
Deploy Action
Derapi
Environmental Defense Fund
Environmental Protection Information Center
Environmental Working Group
ev.energy
Friends Committee on Legislation of California
Generac Power Systems
Immaculate Heart Community Environmental Commission
Leap
Local Clean Energy Alliance
Local Government Sustainable Energy Coalition
NextGen California
Pesticide Action and Agroecology Network
Qcells
Reclaim Our Power: Utility Justice Campaign
Renew Homes
Santa Cruz Climate Action Network
Sierra Club California
Silicon Valley Youth Climate Action
Solar Energy Industries Association
Solar United Neighbors Action
Tesla, Inc.
The Energy Coalition
Uniting the Central Coast for Action
U.S. Green Building Council California
Voltus, Inc.
Vote Solar
OPPOSITION: (Verified 5/14/26)
Coalition of California Utility Employees
Independent Energy Producers Association
Two Individuals
ARGUMENTS IN SUPPORT: According to the California Solar and Storage Association:
DERs are currently eligible to provide Resource Adequacy, but several rules prohibit them from providing their full capacity. In particular, DERs currently do not receive any credit for energy that is exported past the customer’s utility meter onto the distribution system, significantly capping the potential for these resources to provide peak capacity when California’s grid needs it the most. Consequently, this rule and several others have limited DERs’ ability to provide Resource Adequacy as an additional resource that is available to utilities. …This bill would put DERs on equal footing with large resources and allow them to compete and be called upon when they are a cost-effective resource. This will help put downward pressure on rates as it lowers the cost that load-serving entities pay for Resource Adequacy, and it will be a source of clean peak capacity.
ARGUMENTS IN OPPOSITION: According to the Coalition of California Utility Employees:
…there is no guarantee that that the DERs would actually provide resource adequacy. Allowing DERs to count for full resource adequacy credit is problematic if the DERs are not operated or controlled by the IOUs. There is no way to control third-party operation of them and imposing a penalty if the capacity is not delivered is not enough. History shows that penalties are just a part of doing business. This bill would count a DER as capacity even though it might not be available to a load serving entity to benefit the grid because it’s being used to benefit the private interest of the customer.
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
5/18/26 15:05:39
**** END ****
SENATE COMMITTEE ON
Senator Sabrina Cervantes, Chair
2025 - 2026 Regular Session
SB 913 (Becker) - Resource adequacy: aggregated distributed capacity resources
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would propose several policy changes to authorize and expand the use of aggregated distributed energy resources (DERs) to satisfy resource adequacy (RA) requirements.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on May 14, 2026
Fiscal Impact:
- Unknown ongoing costs, potentially in the millions of dollars annually (ratepayer funds), for the California Public Utilities Commission (CPUC) to establish new Qualifying Capacity methodologies, update formal proceedings, establish device-level measurement protocols and technical standards, enforce participation rules and verification mechanisms, coordinate with the California Independent Systems Operator (CAISO) to align participation models, modernize data infrastructure, and otherwise implement the provisions of this bill.
- The California Energy Commission (CEC) anticipates any costs would be minor and absorbable.
Author Amendments:
Author amendments would clarify that enrollment processes for enhanced market-integrated pathways follow those adopted in the Demand Side Grid Support Program 2025 season.
Committee Amendments:
Committee amendments would narrow a provision to preclude net energy metering systems from receiving additional compensation.
-- END --
SENATE COMMITTEE ON
Senator Sabrina Cervantes, Chair
2025 - 2026 Regular Session
SB 913 (Becker) - Resource adequacy: aggregated distributed capacity resources
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would propose several policy changes to authorize and expand the use of aggregated distributed energy resources (DERs) to satisfy resource adequacy (RA) requirements.
Fiscal Impact:
- The California Public Utilities Commission (CPUC) estimates ongoing costs of about $7.5 million annually (ratepayer funds) to establish new Qualifying Capacity (QC) methodologies, update formal proceedings to certify exporting DERs for RA payments, establish device-level measurement protocols and technical standards, enforce participation rules and verification mechanisms to detect and prevent double-counting on dual compensation across programs, coordinate with the California Independent Systems Operator (CAISO) to align participation models, modernize data infrastructure, and otherwise implement the provisions of this bill.
- The California Energy Commission (CEC) anticipates any costs would be minor and absorbable.
Background:
Resource adequacy (RA). Following the California energy crisis of 2000-01, the California Legislature enacted legislation to prevent future incidents of widespread blackouts and rolling brownouts due to lack of electric generating capacity. Among the reforms adopted in response to the crisis was the adoption of Public Utilities Code §380 as an effort to better ensure reliability of electric supply. The statute directs the CPUC, in consultation with the CAISO, to establish RA requirements for all LSEs, including electric investor-owned utilities (IOUs), ESPs, and now includes CCAs, which did not exist at the time of the crisis.
The current RA program consists of system, local, and flexible requirements for each month of a compliance year. There are two types of filings: Annual filings (filed on or around October 31st) and Monthly filings (filed 45 calendar days prior to the compliance month). For the monthly filings, LSEs must demonstrate they have procured 100% of their monthly System and Flexible RA obligation. For the Annual filings, in October of each year, LSEs must demonstrate that they have procured 90% of their system RA obligations for the five summer months (May-September) of the following year, as well as 100% of their local requirements, and 90% of their flexible requirements for each month of the coming compliance year. The CPUC has adopted changes to RA program in recent years, including increasing the planning reserve margin from 15% to 17% by 2024 for all LSEs and in the case of electric IOUs upwards of 20-22% effective planning reserve margin. The CPUC has required a multi-year local capacity RA requirement and adopted local capacity requirements for the upcoming three years. The CAISO conducts a Local Capacity Technical Analysis to identify the minimum local resource capacity required in each local area to meet energy needs used a 1-in-10 weather year and N-1-1(emergency) contingency. The CPUC also assesses penalties on the LSEs who fail to satisfy their RA obligations, including limiting the expansion of CCAs if they are deficient in their RA requirements.
Slice-of-Day Framework. The CPUC is also amid a significant change to the RA program by implementing a slice-of-day framework that assesses the hourly use of resources. The CPUC has been developing the slice-of-day structure for a few years and in 2025 implemented the first year of the slice-of-day framework. The CPUC adopted a 17% planning reserve margin for the slice-of-day framework, consistent with previous planning reserve margins. to procure enough RA to meet load obligations in each hour rather than monthly. Under the slice-of-day framework, LSEs receive a 24-hour obligation for each of the 12 months of the year. The new RA framework, effective for the 2025 compliance year, requires that resources, including energy storage resources, demonstrate their ability to provide capacity during specific, critical hours rather than just a daily peak.
RA Compensation. Resources used to meet an LSE’s RA requirement are compensated for the ability to call on the resource when needed, known as a “must-offer obligation.” A resource that commits to providing RA undertakes the “must-offer obligation” to bid or self-schedule its capacity into the CAISO wholesale market, ensuring capacity is available for system reliability. When generators contract with LSEs to provide RA, they must make their capacity available or face penalties. The actual dispatch of resources to meet load in real-time is performed on an economic basis, with the lowest cost resources committed first. As such, RA resources must be offered into the wholesale market, but they may not be dispatched to serve load if there are less expensive resource bids available (including non-RA resources). The RA program provides an additional source of revenue beyond just actual energy sales. To qualify to sell RA, a resource type must first be assigned a QC from the CPUC, which represents a resource’s maximum capacity eligible to be counted towards meeting its RA. The resource must then register with the CAISO and be tested to determine if it is “deliverable” to load when the transmission system is stressed by high demand. Following the deliverability assessment, each resource is assigned a net qualifying capacity (“NQC”) value, which defines the amount of RA that it can sell. For intermittent resources like wind and solar, the NQC value is typically well below the nameplate capacity of the facility. Demand response and energy storage resources are eligible to provide RA value, while energy efficiency is generally subtracted from the load forecast. In the case of behind-the-meter energy storage resources, they do not receive value for their exports to the grid.
Proposed Law:
This bill would:
- Make several findings and declarations concerning the role of DERs to provide capacity value to satisfy RA requirements.
- Require the CPUC, in coordination with the CEC and the CAISO, on or before June 30, 2027, to enhance existing market-integrated pathways for aggregated distributed capacity resources, as defined, to qualify as RA capacity.
- Require the CPUC to allow electrical corporations, ESPs, and CCAs to include aggregated distributed capacity resources in RA filings and CPUC-ordered procurement.
- Require the CPUC, on or before June 30, 2027, to develop recommendations for changes to the CAISO’s proxy demand resource and the DER aggregation participation models to be consistent with the CPUC’s requirements for aggregated distributed capacity resources pursuant to these provisions, and to request that the CAISO implement these changes in a new or existing initiative.
Related Legislation:
SB 1138 (Padilla) of 2026 would require the CPUC to allow LSEs to satisfy 25% of their RA requirements by trading energy capacity with other LSEs.
AB 740 (Harabedian) of 2025, would have required the CEC, in the next update to the biennial integrated energy policy report after January 1, 2027, and subject to available funding, to adopt a virtual power plant deployment plan. The bill was vetoed by the Governor.
AB 44 (Schultz) of 2025, would have required the CEC, on or before December 1, 2026, and in consultation with LSEs and resource aggregators, to define and publicize methodologies for load modification protocols by which a LSE may reduce or modify its electrical demand forecast upon aggregated system operation of behind-the-meter load modifying technologies and programmatic measures deemed to reliably reduce or modify the LSE’s electrical demand. The bill was vetoed by the Governor.
SB 541 (Becker) of 2025, would have required the CEC, in consultation with specified entities, to analyze the cost-effectiveness of specific load flexibility programs and other types of load-shifting interventions and identify both the approximate amount of load shifting and the cost-effectiveness of each type of load-shifting intervention in the next update to the biennial integrated energy policy report after January 1, 2027, as provided. The bill would have required the CEC, as part of each integrated energy policy report, to estimate each retail supplier’s load-shifting potential, giving consideration to certain factors, as specified. The bill would have required the CEC, on or before July 1, 2028, and biennially thereafter, to analyze and publish the amount of load shifting that each retail supplier achieved in the prior calendar year. The bill was vetoed by the Governor.
AB 2368 (Petrie-Norris, Chapter 713, Statutes of 2024) made various changes to the RA program and integrated resources plan (IRP) at the CPUC in order to address challenges with electricity supply reliability.
AB 1373 (E. Garcia, Chapter Statutes of 2023) made numerous changes to electricity policy, most notably, authorized the Department of Water Resources (DWR) to serve as a central procurement entity to procure energy resources in order to help the state meet its renewable and zero-carbon energy resources and reliability goals. The bill also includes numerous related and additional provisions.
AB 205 (Committee on Budget, Chapter 61, Statutes of 2022), among other things, authorized the DWR to contract for, purchase, finance or otherwise secure electrical generation to create additional capacity during extreme energy grid events, and established the Strategic Reliability Reserve to fund these actions, including the Demand Side Grid Support program at the CEC.
SB 1158 (Becker, Chapter 367, Statutes of 2022) among its provisions, required the CPUC as part of the RA program to require every LSEs to annually report information regarding the sources of electricity and the emissions of greenhouse gases associated with those sources of electricity for RA requirements.
SB 1136 (Hertzberg, Chapter 851, Statutes of 2018) revised existing statute that required the CPUC, in consultation with the CAISO, to establish RA requirements for the state’s LSEs.
SB 618 (Bradford, Chapter 431, Statutes of 2017) required, explicitly, the IRPs of all LSEs to contribute to a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply, meet certain environmental goals, and prevent cost shifting among LSEs.
SB 350 (De León, Chapter 737, Statutes of 2015), among other things, increased the RPS and directed the CPUC to develop a process by which LSEs submit IRPs to the CPUC for review or for certification.
SB 1414 (Wolk, Chapter 627, Statutes of 2014) required utilities and regulators to include demand response in RA plans.
AB 380 (Nuñez, Chapter 367, Statutes of 2005) codified the CPUC’s authority to establish RA standards for electric utilities and other LSEs.
Staff Comments:
This bill would require the CPUC to enhance existing market-integrated pathways for aggregated distributed capacity resources to qualify as resource adequacy capacity, on or before June 30, 2027. According to the CPUC, this would significantly increase Energy Division responsibilities across multiple teams, and new work would include the following:
- Establishing new QC methodologies and update formal proceedings to certify exporting DERs for RA payments.
- Establishing device-level measurement protocols and technical standards to ensure precise performance tracking and grid integration.
- Enforcing participation rules and verification mechanisms to detect and prevent double-counting or dual compensation across programs.
- Coordinating with CAISO to align participation models and develop a proposal for a joint rule change for market-wide DER integration.
- Modernizing data infrastructure by building an integrated modeling tool that synchronizes CAISO’s CIRA and DRRS, with CPUC’s RA and DR databases for verification and enforcement.
- Monitoring IOU implementation of these updates to assess effectiveness and refine regulatory standards as the market scales.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Benjamin Allen, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 4/7/2026
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill proposes several policy changes to authorize and expand the use of aggregated distributed energy resources (DERs) to satisfy resource adequacy (RA) requirements.
ANALYSIS:
Existing law:
- Establishes and vests the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires the California Independent System Operator (CAISO), as a nonprofit, public benefit corporation, to conduct its operations consistent with applicable state and federal laws and consistent with the interests of the people of the state. (Public Utilities Code §345.5)
- Requires the CAISO to ensure the efficient use and reliable operation of the transmission grid, as provided. (Public Utilities Code §345)
- Requires the CAISO to perform a review following a major outage that affects at least 10% of customers of the entity providing the local distribution service, as provided. (Public Utilities Code §349)
- Requires the CPUC, in consultation with the CAISO, to establish RA requirements for all load-serving entities (LSEs) and requires the CPUC in establishing those requirements to ensure the reliability of electrical service in California. Requires the RA program to facilitate the development of new generating, nongenerating, hybrid capacity and retention of existing generating, nongenerating, and hybrid capacity that is economical and needed for reliability. (Public Utilities Code §380)
- Requires that the RA program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified. (Public Utilities Code §380)
- Defines LSE, for that purpose, as an electrical corporation, electric service provider (ESP), or community choice aggregator (CCA). (Public Utilities Code §380)
- Defines “distributed resources” to mean distributed renewable generation resources, energy efficiency, energy storage, electric vehicles, and demand response technologies. (Public Utilities Code §769)
- Creates the Demand Side Grid Support Program and requires the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) to implement and administer the program to incentivize dispatchable customer load reduction and backup generation operation as on-call emergency supply and load reduction for the state’s electrical grid during extreme events. (Public Resources Code §25792)
This bill:
- Makes several findings and declarations concerning the role of DERs to provide capacity value to satisfy RA requirements.
- Requires the CPUC, in coordination with the CEC and the CAISO, on or before June 30, 2027, to enhance existing market-integrated pathways for aggregated distributed capacity resources, as defined, to qualify as RA capacity.
- Requires the CPUC to allow electrical corporations, ESPs, and CCAs to include aggregated distributed capacity resources in RA filings and CPUC-ordered procurement.
- Requires the CPUC, on or before June 30, 2027, to develop recommendations for changes to the CAISO’s proxy demand resource and the DER aggregation participation models to be consistent with the CPUC’s requirements for aggregated distributed capacity resources pursuant to these provisions, and to request that the CAISO implement these changes in a new or existing initiative.
Background
Resource adequacy (RA). Following the California energy crisis of 2000-01, the California Legislature enacted legislation to prevent future incidents of widespread blackouts and rolling brownouts due to lack of electric generating capacity. Among the reforms adopted in response to the crisis was the adoption of Public Utilities Code §380 as an effort to better ensure reliability of electric supply. The statute directs the CPUC, in consultation with the CAISO, to establish RA requirements for all LSEs, including electric investor-owned utilities (IOUs), ESPs, and now includes CCAs, which did not exist at the time of the crisis.
The current RA program consists of system, local, and flexible requirements for each month of a compliance year. There are two types of filings: Annual filings (filed on or around October 31st) and Monthly filings (filed 45 calendar days prior to the compliance month). For the monthly filings, LSEs must demonstrate they have procured 100% of their monthly System and Flexible RA obligation. For the Annual filings, in October of each year, LSEs must demonstrate that they have procured 90% of their system RA obligations for the five summer months (May-September) of the following year, as well as 100% of their local requirements, and 90% of their flexible requirements for each month of the coming compliance year. The CPUC has adopted changes to RA program in recent years, including increasing the planning reserve margin from 15% to 17% by 2024 for all LSEs and in the case of electric IOUs upwards of 20-22% effective planning reserve margin. The CPUC has required a multi-year local capacity RA requirement and adopted local capacity requirements for the upcoming three years. The CAISO conducts a Local Capacity Technical Analysis to identify the minimum local resource capacity required in each local area to meet energy needs used a 1-in-10 weather year and N-1-1(emergency) contingency. The CPUC also assesses penalties on the LSEs who fail to satisfy their RA obligations, including limiting the expansion of CCAs if they are deficient in their RA requirements.
Slice-of-Day Framework. The CPUC is also amid a significant change to the RA program by implementing a slice-of-day framework that assesses the hourly use of resources. The CPUC has been developing the slice-of-day structure for a few years and in 2025 implemented the first year of the slice-of-day framework. The CPUC adopted a 17% planning reserve margin for the slice-of-day framework, consistent with previous planning reserve margins. to procure enough RA to meet load obligations in each hour rather than monthly. Under the slice-of-day framework, LSEs receive a 24-hour obligation for each of the 12 months of the year. The new RA framework, effective for the 2025 compliance year, requires that resources, including energy storage resources, demonstrate their ability to provide capacity during specific, critical hours rather than just a daily peak.
RA Compensation. Resources used to meet an LSE’s RA requirement are compensated for the ability to call on the resource when needed, known as a “must-offer obligation.” A resource that commits to providing RA undertakes the “must-offer obligation” to bid or self-schedule its capacity into the CAISO wholesale market, ensuring capacity is available for system reliability. When generators contract with LSEs to provide RA, they must make their capacity available or face penalties. The actual dispatch of resources to meet load in real-time is performed on an economic basis, with the lowest cost resources committed first. As such, RA resources must be offered into the wholesale market, but they may not be dispatched to serve load if there are less expensive resource bids available (including non-RA resources). The RA program provides an additional source of revenue beyond just actual energy sales. To qualify to sell RA, a resource type must first be assigned a qualifying capacity (QC) from the CPUC, which represents a resource’s maximum capacity eligible to be counted towards meeting its RA. The resource must then register with the CAISO and be tested to determine if it is “deliverable” to load when the transmission system is stressed by high demand. Following the deliverability assessment, each resource is assigned a net qualifying capacity (“NQC”) value, which defines the amount of RA that it can sell. For intermittent resources like wind and solar, the NQC value is typically well below the nameplate capacity of the facility. Demand response and energy storage resources are eligible to provide RA value, while energy efficiency is generally subtracted from the load forecast. In the case of behind-the-meter energy storage resources, they do not receive value for their exports to the grid.
Comments
Need for this bill. According to the author:
Californians are struggling with rising electricity bills, and we need to use our grid more intelligently and cost-effectively. Instead of always building expensive new infrastructure to meet just a few peak hours of demand, we should be making better use of the resources we already have in our homes. Millions of Californians already have tools like smart thermostats, home batteries, and electric vehicles that can help support the grid. SB 913 ensures we can use those resources to lower costs, reduce pollution, and improve reliability.
Supporters frustrated by the value of DERs and aggregated resources within the RA market. The supporters of the bill express frustrations that behind-the-meter DERs and aggregated resources are not able to compete fairly within the RA market. They contend that a myriad of existing rules at the CPUC and CAISO diminish the value of these resources to participate more fully in the wholesale market compared to other energy resources. They believe this bill is necessary to level the playing field and ensure these resources can provide their full benefit to the electrical system and as such help reduce costs for all customers. They point to the success of the CEC’s Demand Side Grid Support (DSGS) program which has enrolled 1000 MW of DERs to participate in the program. The DSGS Program provides incentives to reduce customer net load during extreme events with upfront capacity commitments and for per-unit reductions in net load. The DSGS Program has been funded through the State Budget, however, the opportunity for future funds is less certain. The supporters contend that the continued growth of battery energy storage systems and electric vehicles, for example, presents an opportunity to aggregate these loads and help reduce consumption during peak periods, thereby reducing the strain on the electric grid. They view these resources as untapped potential, noting that of the 2.5 million EVs in California today, only around 25,000 are on managed charging programs, and that smart thermostats and smart electric panels add to the ability to reduce consumption when wholesale market prices skyrocket.
Various efforts to re-examine the value of energy storage and DERs, including aggregations, for RA. As noted above, both the CPUC and CAISO have important roles in developing the RA program and the values of the various energy resources used in the program. As DERs volume has grown and types have expanded, including solar, energy storage, electric vehicles, and others load-modifying resources (including the aggregation of thermostats) there is growing demand by stakeholders to better optimize their participation in the wholesale market by modifying load and to receive capacity value for their exported energy. The CAISO tariffs allow aggregations of DERs to participate in its markets. However, the issue of the full capacity value for behind-the-meter DERs and aggregation has continued to be pressed by stakeholders at the CPUC and CAISO for many years.
The CPUC has an open proceeding (R. 25-09-004, Scoping Memo dated February 12, 2026) which is considering additional enhancements to demand response programs, including revisiting valuation methodologies, CAISO market integration topics, and RA valuation. Additionally, the CAISO also has a current working group, Demand and Distributed Energy Market Integration Working Group, that is actively discussing enhancements to or development of participation models and market rules facilitating the representation of demand and distributed energy, either independently or managed aggregation, in the CAISO wholesale markets. CAISO demand and distributed energy market integration initiative was launched in February 2025 and issued a Discussion Paper on November 26, 2025 which is now helping to shape priorities for these issues, including the value of behind-the-meter energy storage exports, value of aggregated DERs, and other related issues raised in this bill.
Bill seeks specific outcomes. This bill proposes to prescribe the what, how, and by when the CPUC and CAISO must adopt enhancements to existing rules in order to achieve the supporters’ goals to attain greater capacity value for these resources within the RA program. The proposed requirements include value for energy exports from energy battery storage, aggregation of these resources, multiple devices and multiple enrollments behind the same customer meter, using device telemetry, and customer enrollments that require utility login or other barriers. These requirements are better addressed within the CPUC and CAISO proceedings and initiatives, particularly as they may need to address how they may affect other program participation and compensation. However, the supporters of this bill find waiting for changes may result in little progress absent a bill to push the discussions and effort towards their desired outcomes. In some cases, the technical feasibility of the prescribed requirements may be premature, and infeasible. For example, the CAISO in a March 2026 Straw Proposal noted that they are not proposing to move from service account-level registration to customer device-level registration at this time. They note that no other ISO/RTO currently maintains device-level registration and such an approach would introduce challenges with data-sharing arrangements with utilities and changes to demand response registrations. Additionally, provisions of this bill prohibit the CPUC from taking specified actions related to procurement and resource adequacy, particularly those in (c)(1) of the bill. Such a prohibition could limit the CPUC’s ability to address supply constraints. In this regard, the author and committee may wish to amend this bill to recast the language to ensure the CPUC does not prevent aggregated distributed capacity from fairly competing with other resources by ensuring the procurement requirements reflect the needed attributes to serve the electrical system.
Dual Referral. Should this bill be approved by this committee, it will be re-referred to the Senate Privacy, Digital Technologies, and Consumer Protection Committee.
Prior/Related Legislation
SB 1138 (Padilla) of 2026, requires the CPUC to allow LSEs to satisfy 25% of their RA requirements by trading energy capacity with other LSEs. The bill is pending in this committee.
AB 740 (Harabedian) of 2025, would have required the CEC, in the next update to the biennial integrated energy policy report after January 1, 2027, and subject to available funding, to adopt a virtual power plant deployment plan. The bill was vetoed by the Governor.
AB 44 (Schultz) of 2025, would have required the CEC, on or before December 1, 2026, and in consultation with LSEs and resource aggregators, to define and publicize methodologies for load modification protocols by which a LSE may reduce or modify its electrical demand forecast upon aggregated system operation of behind-the-meter load modifying technologies and programmatic measures deemed to reliably reduce or modify the LSE’s electrical demand. The bill was vetoed by the Governor.
SB 541 (Becker) of 2025, would have required the CEC, in consultation with specified entities, to analyze the cost-effectiveness of specific load flexibility programs and other types of load-shifting interventions and identify both the approximate amount of load shifting and the cost-effectiveness of each type of load-shifting intervention in the next update to the biennial integrated energy policy report after January 1, 2027, as provided. The bill would have required the CEC, as part of each integrated energy policy report, to estimate each retail supplier’s load-shifting potential, giving consideration to certain factors, as specified. The bill would have required the CEC, on or before July 1, 2028, and biennially thereafter, to analyze and publish the amount of load shifting that each retail supplier achieved in the prior calendar year. The bill was vetoed by the Governor.
AB 2368 (Petrie-Norris, Chapter 713, Statutes of 2024) made various changes to the RA program and integrated resources plan (IRP) at the CPUC in order to address challenges with electricity supply reliability.
AB 1373 (E. Garcia, Chapter Statutes of 2023) made numerous changes to electricity policy, most notably, authorized the Department of Water Resources (DWR) to serve as a central procurement entity to procure energy resources in order to help the state meet its renewable and zero-carbon energy resources and reliability goals. The bill also includes numerous related and additional provisions.
AB 205 (Committee on Budget, Chapter 61, Statutes of 2022), among other things, authorized the DWR to contract for, purchase, finance or otherwise secure electrical generation to create additional capacity during extreme energy grid events, and established the Strategic Reliability Reserve to fund these actions, including the Demand Side Grid Support program at the CEC.
SB 1158 (Becker, Chapter 367, Statutes of 2022) among its provisions, required the CPUC as part of the RA program to require every LSEs to annually report information regarding the sources of electricity and the emissions of greenhouse gases associated with those sources of electricity for RA requirements.
SB 1136 (Hertzberg, Chapter 851, Statutes of 2018) revised existing statute that required the CPUC, in consultation with the CAISO, to establish RA requirements for the state’s LSEs.
SB 618 (Bradford, Chapter 431, Statutes of 2017) required, explicitly, the IRPs of all LSEs to contribute to a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply, meet certain environmental goals, and prevent cost shifting among LSEs.
SB 350 (De León, Chapter 737, Statutes of 2015), among other things, increased the RPS and directed the CPUC to develop a process by which LSEs submit IRPs to the CPUC for review or for certification.
SB 1414 (Wolk, Chapter 627, Statutes of 2014) required utilities and regulators to include demand response in RA plans.
AB 380 (Nuñez, Chapter 367, Statutes of 2005) codified the CPUC’s authority to establish RA standards for electric utilities and other LSEs.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
Environment California (Co-Sponsor)
The Climate Center (Co-Sponsor)
350 Bay Area Action
350 Humboldt
Active San Gabriel Valley
Advanced Energy United
California Alliance for Community Energy
California Efficiency + Demand Management Council
California Public Interest Research Group
California Solar & Storage Association
Center for Biological Diversity
Center for Community Energy
Center for Environmental Health
Ceres
Clean Coalition
CleanEarth4Kids.org
Climate Action California
Climate Action Campaign
Climate Health Now Action Fund
Community Environmental Council
Deploy Action
Derapi
Environmental Defense Fund
Environmental Protection Information Center
Environmental Working Group
ev.energy
Friends Committee on Legislation of California
Immaculate Heart Community Environmental Commission
Leap
Local Clean Energy Alliance
Local Government Sustainable Energy Coalition
NextGen California
Pesticide Action and Agroecology Network
Qcells
Reclaim Our Power: Utility Justice Campaign
Santa Cruz Climate Action Network
Sierra Club California
Silicon Valley Youth Climate Action
Solar Energy Industries Association
Solar United Neighbors Action
Tesla, Inc.
The Energy Coalition
Uniting the Central Coast for Action
U.S. Green Building Council California
Voltus, Inc.
Vote Solar
OPPOSITION:
An individual
ARGUMENTS IN SUPPORT: According to the California Solar and Storage Association:
DERs are currently eligible to provide Resource Adequacy, but several rules prohibit them from providing their full capacity. In particular, DERs currently do not receive any credit for energy that is exported past the customer’s utility meter onto the distribution system, significantly capping the potential for these resources to provide peak capacity when California’s grid needs it the most. Consequently, this rule and several others have limited DERs’ ability to provide Resource Adequacy as an additional resource that is available to utilities. …This bill would put DERs on equal footing with large resources and allow them to compete and be called upon when they are a cost-effective resource. This will help put downward pressure on rates as it lowers the cost that load-serving entities pay for Resource Adequacy, and it will be a source of clean peak capacity.
ARGUMENTS IN OPPOSITION: The individual opposition to this bill expresses support for the proposed expansion of DERs in the RA program, but raises concerns that the level of measurement for performance, at the device-level rather than the customer’s meter, could undermine the value of these resources to the electrical system.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Benjamin Allen, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 4/7/2026
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill proposes several policy changes to authorize and expand the use of aggregated distributed energy resources (DERs) to satisfy resource adequacy (RA) requirements.
ANALYSIS:
Existing law:
- Establishes and vests the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical corporations. (Article XII of the California Constitution)
- Requires the California Independent System Operator (CAISO), as a nonprofit, public benefit corporation, to conduct its operations consistent with applicable state and federal laws and consistent with the interests of the people of the state. (Public Utilities Code §345.5)
- Requires the CAISO to ensure the efficient use and reliable operation of the transmission grid, as provided. (Public Utilities Code §345)
- Requires the CAISO to perform a review following a major outage that affects at least 10% of customers of the entity providing the local distribution service, as provided. (Public Utilities Code §349)
- Requires the CPUC, in consultation with the CAISO, to establish RA requirements for all load-serving entities (LSEs) and requires the CPUC in establishing those requirements to ensure the reliability of electrical service in California. Requires the RA program to facilitate the development of new generating, nongenerating, hybrid capacity and retention of existing generating, nongenerating, and hybrid capacity that is economical and needed for reliability. (Public Utilities Code §380)
- Requires that the RA program achieve specified objectives, including that it establish new or maintain existing demand response products and tariffs, as specified. (Public Utilities Code §380)
- Defines LSE, for that purpose, as an electrical corporation, electric service provider (ESP), or community choice aggregator (CCA). (Public Utilities Code §380)
- Defines “distributed resources” to mean distributed renewable generation resources, energy efficiency, energy storage, electric vehicles, and demand response technologies. (Public Utilities Code §769)
- Creates the Demand Side Grid Support Program and requires the State Energy Resources Conservation and Development Commission (California Energy Commission (CEC)) to implement and administer the program to incentivize dispatchable customer load reduction and backup generation operation as on-call emergency supply and load reduction for the state’s electrical grid during extreme events. (Public Resources Code §25792)
This bill:
- Makes several findings and declarations concerning the role of DERs to provide capacity value to satisfy RA requirements.
- Requires the CPUC, in coordination with the CEC and the CAISO, on or before June 30, 2027, to enhance existing market-integrated pathways for aggregated distributed capacity resources, as defined, to qualify as RA capacity.
- Requires the CPUC to allow electrical corporations, ESPs, and CCAs to include aggregated distributed capacity resources in RA filings and CPUC-ordered procurement.
- Requires the CPUC, on or before June 30, 2027, to develop recommendations for changes to the CAISO’s proxy demand resource and the DER aggregation participation models to be consistent with the CPUC’s requirements for aggregated distributed capacity resources pursuant to these provisions, and to request that the CAISO implement these changes in a new or existing initiative.
Background
Resource adequacy (RA). Following the California energy crisis of 2000-01, the California Legislature enacted legislation to prevent future incidents of widespread blackouts and rolling brownouts due to lack of electric generating capacity. Among the reforms adopted in response to the crisis was the adoption of Public Utilities Code §380 as an effort to better ensure reliability of electric supply. The statute directs the CPUC, in consultation with the CAISO, to establish RA requirements for all LSEs, including electric investor-owned utilities (IOUs), ESPs, and now includes CCAs, which did not exist at the time of the crisis.
The current RA program consists of system, local, and flexible requirements for each month of a compliance year. There are two types of filings: Annual filings (filed on or around October 31st) and Monthly filings (filed 45 calendar days prior to the compliance month). For the monthly filings, LSEs must demonstrate they have procured 100% of their monthly System and Flexible RA obligation. For the Annual filings, in October of each year, LSEs must demonstrate that they have procured 90% of their system RA obligations for the five summer months (May-September) of the following year, as well as 100% of their local requirements, and 90% of their flexible requirements for each month of the coming compliance year. The CPUC has adopted changes to RA program in recent years, including increasing the planning reserve margin from 15% to 17% by 2024 for all LSEs and in the case of electric IOUs upwards of 20-22% effective planning reserve margin. The CPUC has required a multi-year local capacity RA requirement and adopted local capacity requirements for the upcoming three years. The CAISO conducts a Local Capacity Technical Analysis to identify the minimum local resource capacity required in each local area to meet energy needs used a 1-in-10 weather year and N-1-1(emergency) contingency. The CPUC also assesses penalties on the LSEs who fail to satisfy their RA obligations, including limiting the expansion of CCAs if they are deficient in their RA requirements.
Slice-of-Day Framework. The CPUC is also amid a significant change to the RA program by implementing a slice-of-day framework that assesses the hourly use of resources. The CPUC has been developing the slice-of-day structure for a few years and in 2025 implemented the first year of the slice-of-day framework. The CPUC adopted a 17% planning reserve margin for the slice-of-day framework, consistent with previous planning reserve margins. to procure enough RA to meet load obligations in each hour rather than monthly. Under the slice-of-day framework, LSEs receive a 24-hour obligation for each of the 12 months of the year. The new RA framework, effective for the 2025 compliance year, requires that resources, including energy storage resources, demonstrate their ability to provide capacity during specific, critical hours rather than just a daily peak.
RA Compensation. Resources used to meet an LSE’s RA requirement are compensated for the ability to call on the resource when needed, known as a “must-offer obligation.” A resource that commits to providing RA undertakes the “must-offer obligation” to bid or self-schedule its capacity into the CAISO wholesale market, ensuring capacity is available for system reliability. When generators contract with LSEs to provide RA, they must make their capacity available or face penalties. The actual dispatch of resources to meet load in real-time is performed on an economic basis, with the lowest cost resources committed first. As such, RA resources must be offered into the wholesale market, but they may not be dispatched to serve load if there are less expensive resource bids available (including non-RA resources). The RA program provides an additional source of revenue beyond just actual energy sales. To qualify to sell RA, a resource type must first be assigned a qualifying capacity (QC) from the CPUC, which represents a resource’s maximum capacity eligible to be counted towards meeting its RA. The resource must then register with the CAISO and be tested to determine if it is “deliverable” to load when the transmission system is stressed by high demand. Following the deliverability assessment, each resource is assigned a net qualifying capacity (“NQC”) value, which defines the amount of RA that it can sell. For intermittent resources like wind and solar, the NQC value is typically well below the nameplate capacity of the facility. Demand response and energy storage resources are eligible to provide RA value, while energy efficiency is generally subtracted from the load forecast. In the case of behind-the-meter energy storage resources, they do not receive value for their exports to the grid.
Comments
Need for this bill. According to the author:
Californians are struggling with rising electricity bills, and we need to use our grid more intelligently and cost-effectively. Instead of always building expensive new infrastructure to meet just a few peak hours of demand, we should be making better use of the resources we already have in our homes. Millions of Californians already have tools like smart thermostats, home batteries, and electric vehicles that can help support the grid. SB 913 ensures we can use those resources to lower costs, reduce pollution, and improve reliability.
Supporters frustrated by the value of DERs and aggregated resources within the RA market. The supporters of the bill express frustrations that behind-the-meter DERs and aggregated resources are not able to compete fairly within the RA market. They contend that a myriad of existing rules at the CPUC and CAISO diminish the value of these resources to participate more fully in the wholesale market compared to other energy resources. They believe this bill is necessary to level the playing field and ensure these resources can provide their full benefit to the electrical system and as such help reduce costs for all customers. They point to the success of the CEC’s Demand Side Grid Support (DSGS) program which has enrolled 1000 MW of DERs to participate in the program. The DSGS Program provides incentives to reduce customer net load during extreme events with upfront capacity commitments and for per-unit reductions in net load. The DSGS Program has been funded through the State Budget, however, the opportunity for future funds is less certain. The supporters contend that the continued growth of battery energy storage systems and electric vehicles, for example, presents an opportunity to aggregate these loads and help reduce consumption during peak periods, thereby reducing the strain on the electric grid. They view these resources as untapped potential, noting that of the 2.5 million EVs in California today, only around 25,000 are on managed charging programs, and that smart thermostats and smart electric panels add to the ability to reduce consumption when wholesale market prices skyrocket.
Various efforts to re-examine the value of energy storage and DERs, including aggregations, for RA. As noted above, both the CPUC and CAISO have important roles in developing the RA program and the values of the various energy resources used in the program. As DERs volume has grown and types have expanded, including solar, energy storage, electric vehicles, and others load-modifying resources (including the aggregation of thermostats) there is growing demand by stakeholders to better optimize their participation in the wholesale market by modifying load and to receive capacity value for their exported energy. The CAISO tariffs allow aggregations of DERs to participate in its markets. However, the issue of the full capacity value for behind-the-meter DERs and aggregation has continued to be pressed by stakeholders at the CPUC and CAISO for many years.
The CPUC has an open proceeding (R. 25-09-004, Scoping Memo dated February 12, 2026) which is considering additional enhancements to demand response programs, including revisiting valuation methodologies, CAISO market integration topics, and RA valuation. Additionally, the CAISO also has a current working group, Demand and Distributed Energy Market Integration Working Group, that is actively discussing enhancements to or development of participation models and market rules facilitating the representation of demand and distributed energy, either independently or managed aggregation, in the CAISO wholesale markets. CAISO demand and distributed energy market integration initiative was launched in February 2025 and issued a Discussion Paper on November 26, 2025 which is now helping to shape priorities for these issues, including the value of behind-the-meter energy storage exports, value of aggregated DERs, and other related issues raised in this bill.
Bill seeks specific outcomes. This bill proposes to prescribe the what, how, and by when the CPUC and CAISO must adopt enhancements to existing rules in order to achieve the supporters’ goals to attain greater capacity value for these resources within the RA program. The proposed requirements include value for energy exports from energy battery storage, aggregation of these resources, multiple devices and multiple enrollments behind the same customer meter, using device telemetry, and customer enrollments that require utility login or other barriers. These requirements are better addressed within the CPUC and CAISO proceedings and initiatives, particularly as they may need to address how they may affect other program participation and compensation. However, the supporters of this bill find waiting for changes may result in little progress absent a bill to push the discussions and effort towards their desired outcomes. In some cases, the technical feasibility of the prescribed requirements may be premature, and infeasible. For example, the CAISO in a March 2026 Straw Proposal noted that they are not proposing to move from service account-level registration to customer device-level registration at this time. They note that no other ISO/RTO currently maintains device-level registration and such an approach would introduce challenges with data-sharing arrangements with utilities and changes to demand response registrations. Additionally, provisions of this bill prohibit the CPUC from taking specified actions related to procurement and resource adequacy, particularly those in (c)(1) of the bill. Such a prohibition could limit the CPUC’s ability to address supply constraints. In this regard, the author and committee may wish to amend this bill to recast the language to ensure the CPUC does not prevent aggregated distributed capacity from fairly competing with other resources by ensuring the procurement requirements reflect the needed attributes to serve the electrical system.
Prior/Related Legislation
SB 1138 (Padilla) of 2026, requires the CPUC to allow LSEs to satisfy 25% of their RA requirements by trading energy capacity with other LSEs. The bill is pending in this committee.
AB 740 (Harabedian) of 2025, would have required the CEC, in the next update to the biennial integrated energy policy report after January 1, 2027, and subject to available funding, to adopt a virtual power plant deployment plan. The bill was vetoed by the Governor.
AB 44 (Schultz) of 2025, would have required the CEC, on or before December 1, 2026, and in consultation with LSEs and resource aggregators, to define and publicize methodologies for load modification protocols by which a LSE may reduce or modify its electrical demand forecast upon aggregated system operation of behind-the-meter load modifying technologies and programmatic measures deemed to reliably reduce or modify the LSE’s electrical demand. The bill was vetoed by the Governor.
SB 541 (Becker) of 2025, would have required the CEC, in consultation with specified entities, to analyze the cost-effectiveness of specific load flexibility programs and other types of load-shifting interventions and identify both the approximate amount of load shifting and the cost-effectiveness of each type of load-shifting intervention in the next update to the biennial integrated energy policy report after January 1, 2027, as provided. The bill would have required the CEC, as part of each integrated energy policy report, to estimate each retail supplier’s load-shifting potential, giving consideration to certain factors, as specified. The bill would have required the CEC, on or before July 1, 2028, and biennially thereafter, to analyze and publish the amount of load shifting that each retail supplier achieved in the prior calendar year. The bill was vetoed by the Governor.
AB 2368 (Petrie-Norris, Chapter 713, Statutes of 2024) made various changes to the RA program and integrated resources plan (IRP) at the CPUC in order to address challenges with electricity supply reliability.
AB 1373 (E. Garcia, Chapter Statutes of 2023) made numerous changes to electricity policy, most notably, authorized the Department of Water Resources (DWR) to serve as a central procurement entity to procure energy resources in order to help the state meet its renewable and zero-carbon energy resources and reliability goals. The bill also includes numerous related and additional provisions.
AB 205 (Committee on Budget, Chapter 61, Statutes of 2022), among other things, authorized the DWR to contract for, purchase, finance or otherwise secure electrical generation to create additional capacity during extreme energy grid events, and established the Strategic Reliability Reserve to fund these actions, including the Demand Side Grid Support program at the CEC.
SB 1158 (Becker, Chapter 367, Statutes of 2022) among its provisions, required the CPUC as part of the RA program to require every LSEs to annually report information regarding the sources of electricity and the emissions of greenhouse gases associated with those sources of electricity for RA requirements.
SB 1136 (Hertzberg, Chapter 851, Statutes of 2018) revised existing statute that required the CPUC, in consultation with the CAISO, to establish RA requirements for the state’s LSEs.
SB 618 (Bradford, Chapter 431, Statutes of 2017) required, explicitly, the IRPs of all LSEs to contribute to a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply, meet certain environmental goals, and prevent cost shifting among LSEs.
SB 350 (De León, Chapter 737, Statutes of 2015), among other things, increased the RPS and directed the CPUC to develop a process by which LSEs submit IRPs to the CPUC for review or for certification.
SB 1414 (Wolk, Chapter 627, Statutes of 2014) required utilities and regulators to include demand response in RA plans.
AB 380 (Nuñez, Chapter 367, Statutes of 2005) codified the CPUC’s authority to establish RA standards for electric utilities and other LSEs.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
Environment California (Co-Sponsor)
The Climate Center (Co-Sponsor)
350 Bay Area Action
350 Humboldt
Active San Gabriel Valley
Advanced Energy United
California Alliance for Community Energy
California Efficiency + Demand Management Council
California Public Interest Research Group
California Solar & Storage Association
Center for Biological Diversity
Center for Community Energy
Center for Environmental Health
Ceres
Clean Coalition
CleanEarth4Kids.org
Climate Action California
Climate Action Campaign
Climate Health Now Action Fund
Community Environmental Council
Deploy Action
Derapi
Environmental Defense Fund
Environmental Protection Information Center
Environmental Working Group
ev.energy
Friends Committee on Legislation of California
Immaculate Heart Community Environmental Commission
Leap
Local Clean Energy Alliance
Local Government Sustainable Energy Coalition
NextGen California
Pesticide Action and Agroecology Network
Qcells
Reclaim Our Power: Utility Justice Campaign
Santa Cruz Climate Action Network
Sierra Club California
Silicon Valley Youth Climate Action
Solar Energy Industries Association
Solar United Neighbors Action
Tesla, Inc.
The Energy Coalition
Uniting the Central Coast for Action
U.S. Green Building Council California
Voltus, Inc.
Vote Solar
OPPOSITION:
An individual
ARGUMENTS IN SUPPORT: According to the California Solar and Storage Association:
DERs are currently eligible to provide Resource Adequacy, but several rules prohibit them from providing their full capacity. In particular, DERs currently do not receive any credit for energy that is exported past the customer’s utility meter onto the distribution system, significantly capping the potential for these resources to provide peak capacity when California’s grid needs it the most. Consequently, this rule and several others have limited DERs’ ability to provide Resource Adequacy as an additional resource that is available to utilities. …This bill would put DERs on equal footing with large resources and allow them to compete and be called upon when they are a cost-effective resource. This will help put downward pressure on rates as it lowers the cost that load-serving entities pay for Resource Adequacy, and it will be a source of clean peak capacity.
ARGUMENTS IN OPPOSITION: The individual opposition to this bill expresses support for the proposed expansion of DERs in the RA program, but raises concerns that the level of measurement for performance, at the device-level rather than the customer’s meter, could undermine the value of these resources to the electrical system.
-- END --
Bill Author
Bill Co-Author(s):