SB 978: Data centers: labor: electricity rates.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2026-03-23
Current Status:
In Progress
(2026-05-14: May 14 hearing: Held in committee and under submission.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law authorizes the PUC to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable.
This bill would require the PUC to establish a special rate structure for large-scale energy users, who would be defined as customers of electrical corporations operating facilities with operational requirements of at least data centers, as defined, taking transmission level electrical service with an estimated peak demand of at least 75 megawatts of electricity, except as provided, electricity to, among other things, protect other customers of electrical corporations, prohibit cost shifts to those other customers, and require large-scale energy users data centers to pay for the electrical corporations upfront costs of transmission or distribution infrastructure upgrades necessary for the provision of electrical service to those users. the data centers. The bill would require the construction of those facilities data centers subject to the special rate structure to comply with certain labor requirements.
Existing law establishes the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90% of all retail sales of electricity to California end-use customers by December 31, 2035, 95% by December 31, 2040, and 100% by December 31, 2045. Existing law requires the PUC, the State Energy Resources Conservation and Development Commission, and the State Air Resources Board, in consultation with all California balancing authorities, to annually issue a joint report related to meeting that state policy.
This bill would require that the joint report also includes the impacts of large-scale energy users data centers subject to the special rate structure on the states ability to achieve the above-described state policy.
Under existing law, a violation of the Public Utilities Act or an order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of the bill would be part of the act and a violation of a PUC action implementing the bills requirements would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law authorizes the PUC to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable.
This bill would require the PUC to establish a special rate structure for large-scale energy users, who would be defined as customers of electrical corporations operating facilities with operational requirements of at least 75 megawatts of electricity, except as provided, to protect other customers of electrical corporations, prevent prohibit cost shifts to those other customers, and require large-scale energy users to pay for the electrical corporations upfront costs of transmission or distribution infrastructure upgrades necessary for the provision of electrical service to those users. The bill would require the construction of those facilities to comply with certain labor requirements.
Existing law establishes the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90% of all retail sales of electricity to California end-use customers by December 31, 2035, 95% by December 31, 2040, and 100% by December 31, 2045. Existing law requires the PUC, the State Energy Resources Conservation and Development Commission, and the State Air Resources Board, in consultation with all California balancing authorities, to annually issue a joint report related to meeting that state policy.
This bill would require that the joint report also include includes the impacts of large-scale energy users on the states ability to achieve the above-described state policy.
Under existing law, a violation of the Public Utilities Act or an order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of the bill would be part of the act and a violation of a PUC action implementing the bills requirements would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law authorizes the PUC to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable.
This bill would require the PUC to establish a special rate structure for large-scale energy users, who would be defined as customers of electrical corporations operating facilities with operational requirements of at least 75 megawatts of electricity, to protect other customers of electrical corporations, prevent cost shifts to those other customers, and require large-scale energy users to pay for the electrical corporations upfront costs of transmission or distribution infrastructure upgrades necessary for the provision of electrical service to those users. The bill would require the construction of those facilities to comply with certain labor requirements.
Existing law establishes the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90% of all retail sales of electricity to California end-use customers by December 31, 2035, 95% by December 31, 2040, and 100% by December 31, 2045. Existing law requires the PUC, the State Energy Resources Conservation and Development Commission, and the State Air Resources Board, in consultation with all California balancing authorities, to annually issue a joint report related to meeting that state policy.
This bill would require that the joint report also include the impacts of large-scale energy users on the states ability to achieve the above-described state policy.
Under existing law, a violation of an order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because a violation of a PUC action implementing the bills requirements would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(a)For purposes of this section, all of the following definitions apply:
(1)(A)Data center means a facility that primarily contains electronic equipment used to process, store, and transmit digital information, that may be a free-standing structure or a facility within a larger structure, and that uses environmental control equipment to maintain the proper conditions for the operation of electronic equipment.
(B)Data center does not include any publicly funded research facility, public safety facility, national security facility, publicly owned facility, and other utility facility, including, but not limited to, an asset of a facilities-based telecommunications provider.
(1)(2)(A)Facility means physical property, a plant, a building, a structure, a source, or stationary equipment, located on one or more contiguous or adjacent properties in actual physical contact or separated solely by a public roadway or public right-of-way and under common ownership or common control, and with an operational requirement of at least 75 megawatts of electricity. control.
(B)Facility does not include a facility that introduces a new load as a result of switching from fossil fuels to renewable fuels or transportation electrification activities.
(2)Large-scale energy user means a customer of an electrical corporation operating a facility.(3)Skilled and trained workforce has the same meaning as set forth in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(b)The commission shall establish a special rate structure for large-scale energy users that does both data centers taking transmission level electrical service with an estimated peak demand of at least 75 megawatts and that does all of the following:
(1)Protects other customers of an electrical corporation and prohibits cost shifts to those other customers.
(2)(A)Requires the large-scale energy user data center pay for the electrical corporations upfront costs for transmission or distribution infrastructure upgrades necessary to provide electrical service to the large-scale energy user.
(B)The upfront costs described in subparagraph (A) shall not be recovered by the electrical corporation from other customers of the electrical corporation.
(c)(1)A large-scale energy user shall only use onsite solar or wind generation or a battery electric storage system as backup power generation for the facility.(2)A large-scale energy user that uses battery electric storage systems shall enter into a binding agreement with the local fire department to ensure adequate fire protection services are available, including fire protection for the battery electric storage system and dire response times for communities in proximity to the facility.(3)Enables a data centers rate structure to prefund a 15-year contract through the electrical corporation for the installation of new, incremental, zero-carbon energy resources to function as dispatchable reliability assets within the utility service territory.
(4)Ensures that charges generally included in the generation component of a customer bill can be assessed separately from charges generally included in the transmission and distribution component of a customers bill.
(c)An electrical corporation tariff established pursuant this section shall only apply to those facilities for which a new transmission interconnection agreement is established after the adoption of the rate structure established pursuant to this section or on a later date specified by the commission.
(d)(1)Notwithstanding paragraph (1) of subdivision (a) of Section 1720 of the Labor Code, construction of a facility data center subject to the special rate structure constitutes a public works project for purposes of Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code.
(2)A contractor who enters into a contract to perform work on a facility shall do all of the following:
(A)The contractor shall pay each construction worker employed in the execution of the work, at minimum, the general prevailing rate of per diem wages, except that an apprentice registered in a program approved by the Chief of the Division of Apprenticeship Standards shall be paid, at minimum, the applicable apprentice prevailing rate.
(B)The contractor shall maintain and verify payroll records pursuant to Section 1776 of the Labor Code and make those records available for inspection and copying as provided in that section. Notwithstanding Section 1776 of the Labor Code, the contractor shall not be required to provide copies of certified payroll records to any entity other than the Department of Industrial Relations and the commission.
(C)The contractor shall biannually, on July 1 and December 31 of each year, submit to the commission digital copies of its certified payroll records, in a format consistent with systems used for compliance with Section 1776 of the Labor Code, for projects subject to this section. The commission shall retain these records as public records for five years.
(3)The requirement imposed in subparagraph (A) of paragraph (2) may be enforced through any of the following mechanisms:
(A)Within 18 months after completing the facility, by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code.
(B)By an underpaid construction worker or apprentice through an administrative complaint or civil action.
(C)By a joint labor-management committee through a civil action pursuant to Section 1771.2 of the Labor Code.
(4)If a willful violation of this subdivision has been enforced against a contractor for the construction of a facility pursuant to paragraph (3), that facility shall remain eligible to receive service pursuant to the rate structure established pursuant to subdivision (b) if restitution has been made to the affected workers and all associated penalties and fines have been paid.
(5)The commission shall require each large electrical corporation to include the requirements of this subdivision in each interconnection agreement with a large-scale energy user.
(6)This subdivision does not apply to a construction of a facility that is a public work, as defined in Section 1720 of the Labor Code, and that is subject to Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code.
(7)(A)The entity that engaged the contractor to perform work on a facility is not an awarding body, as defined in Section 1722 of the Labor Code. Public works project requirements not codified in this section do not apply to the entity. This section does not affect the entitys liability for nonpayment of wages or materials under Section 3 of Article XIV of the California Constitution.
(B)The contractor who enters into a contract with the entity described in subparagraph (A) to perform work on a facility is the awarding body only for the limited purposes of Section 1773.3 of the Labor Code.
(8)(A)All contracts for the construction of a facility shall require every contractor and subcontractor at every tier to use a skilled and trained workforce for the construction of the facility.
(B)Every contractor and subcontractor at every tier shall use a skilled and trained workforce for the construction of the facility.
SEC. 2.Section 913.11 of the Public Utilities Code is amended to read:913.11.(a)Notwithstanding Section 10231.5 of the Government Code, the commission, Energy Commission, and State Air Resources Board shall, in consultation with all California balancing authorities, as defined in subdivision (d) of Section 399.12, as part of a public process, issue a joint report to the Legislature by January 1, 2021, and at least every four years thereafter.
(b)The joint report shall include all of the following:
(1)A review of the policy described in subdivision (a) of Section 454.53, focused on technologies, forecasts, then-existing transmission, and maintaining safety, environmental and public safety protection, affordability, and system and local reliability.
(2)An evaluation identifying the potential benefits and impacts on system and local reliability associated with achieving the policy described in subdivision (a) of Section 454.53.
(3)An evaluation identifying the nature of any anticipated financial costs and benefits to electrical, gas, and water utilities, including customer rate impacts and benefits.
(4)The barriers to, and benefits of, achieving the policy described in subdivision (a) of Section 454.53.
(5)Alternative scenarios in which the policy described in subdivision (a) of Section 454.53 can be achieved and the estimated costs and benefits of each scenario.
(6)An evaluation of the impacts of large-scale energy users, as defined in data centers subject to the special rate structure established pursuant to Section 740.22, on the states ability to achieve the policy described in subdivision (a) of Section 454.53.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)For purposes of this section, all of the following definitions apply:
(1)(A)Facility means a facility physical property, a plant, a building, a structure, a source, or stationary equipment, located on one or more contiguous or adjacent properties in actual physical contact or separated solely by a public roadway or public right-of-way and under common ownership or common control, and with an operational requirement of at least 75 megawatts of electricity.
(B)Facility does not include a facility that introduces a new load as a result of switching from fossil fuels to renewable fuels or transportation electrification activities.
(2)Large-scale energy user means a customer of an electrical corporation operating a facility.
(3)Skilled and trained workforce has the same meaning as set forth in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(b)The commission shall establish a special rate structure for large-scale energy users that does both of the following:
(1)Protects other customers of an electrical corporation and prevents prohibits cost shifts to those other customers.
(2)(A)Requires the large-scale energy user pay for the electrical corporations upfront costs for transmission or distribution infrastructure upgrades necessary to provide electrical service to the large-scale energy user.
(B)The upfront costs described in subparagraph (A) shall not be recovered by the electrical corporation from other customers of the electrical corporation.
(c)(1)A large-scale energy user shall only use onsite solar or wind generation and or a battery electric storage system as backup power generation for the facility.
(2)A large-scale energy user that uses battery electric storage systems shall enter into a binding agreement with the local fire department to ensure adequate fire protection services are available, including fire protection for the battery electric storage system and dire response times for communities in proximity to the facility.
(d)(1)Notwithstanding paragraph (1) of subdivision (a) of Section 1720 of the Labor Code, construction of a facility constitutes a public works project for purposes of Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code.
(2)A contractor who enters into a contract to perform work on a facility shall do all of the following:
(A)The contractor shall pay each construction worker employed in the execution of the work, at minimum, the general prevailing rate of per diem wages, except that an apprentice registered in a program approved by the Chief of the Division of Apprenticeship Standards shall be paid, at minimum, the applicable apprentice prevailing rate.
(B)The contractor shall maintain and verify payroll records pursuant to Section 1776 of the Labor Code and make those records available for inspection and copying as provided in that section. Notwithstanding Section 1776 of the Labor Code, the contractor shall not be required to provide copies of certified payroll records to any entity other than the Department of Industrial Relations and the commission.
(C)The contractor shall biannually, on July 1 and December 31 of each year, submit to the commission digital copies of its certified payroll records, in a format consistent with systems used for compliance with Section 1776 of the Labor Code, for projects subject to this section. The commission shall retain these records as public records for five years.
(3)The requirement imposed in subparagraph (A) of paragraph (2) may be enforced through any of the following mechanisms:
(A)Within 18 months after completing the facility, by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code.
(B)By an underpaid construction worker or apprentice through an administrative complaint or civil action.
(C)By a joint labor-management committee through a civil action pursuant to Section 1771.2 of the Labor Code.
(4)If a willful violation of this subdivision has been enforced against a contractor for the construction of a facility pursuant to paragraph (3), that facility shall remain eligible to receive service pursuant to the rate structure established pursuant to subdivision (b) if restitution has been made to the affected workers and all associated penalties and fines have been paid.
(5)The commission shall require each large electrical corporation to include the requirements of this subdivision in each interconnection agreement with a large-scale energy user.
(6)This subdivision does not apply to a construction of a facility that is a public work, as defined in Section 1720 of the Labor Code, and that is subject to Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code.
(7)(A)The entity that engaged the contractor to perform work on a facility is not an awarding body, as defined in Section 1722 of the Labor Code. Public works project requirements not codified in this section do not apply to the entity. This section does not affect the entitys liability for nonpayment of wages or materials under Section 3 of Article XIV of the California Constitution.
(B)The contractor who enters into a contract with the entity described in subparagraph (A) to perform work on a facility is the awarding body only for the limited purposes of Section 1773.3 of the Labor Code.
(8)(A)All contracts for the construction of a facility shall require every contractor and subcontractor at every tier to use a skilled and trained workforce for the construction of the facility.
(B)Every contractor and subcontractor at every tier shall use a skilled and trained workforce for the construction of the facility.
SEC. 2.Section 913.11 of the Public Utilities Code is amended to read:913.11.(a)Notwithstanding Section 10231.5 of the Government Code, the commission, Energy Commission, and State Air Resources Board shall, in consultation with all California balancing authorities, as defined in subdivision (d) of Section 399.12, as part of a public process, issue a joint report to the Legislature by January 1, 2021, and at least every four years thereafter.
(b)The joint report shall include all of the following:
(1)A review of the policy described in subdivision (a) of Section 454.53, focused on technologies, forecasts, then-existing transmission, and maintaining safety, environmental and public safety protection, affordability, and system and local reliability.
(2)An evaluation identifying the potential benefits and impacts on system and local reliability associated with achieving the policy described in subdivision (a) of Section 454.53.
(3)An evaluation identifying the nature of any anticipated financial costs and benefits to electrical, gas, and water utilities, including customer rate impacts and benefits.
(4)The barriers to, and benefits of, achieving the policy described in subdivision (a) of Section 454.53.
(5)Alternative scenarios in which the policy described in subdivision (a) of Section 454.53 can be achieved and the estimated costs and benefits of each scenario.
(6)An evaluation of the impacts of large-scale energy users, as defined in Section 740.22, on the states ability to achieve the policy described in subdivision (a) of Section 454.53.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)For purposes of this section, all of the following definitions apply:
(1)Facility means a facility with an operational requirement of at least 75 megawatts of electricity.
(2)Large-scale energy user means a customer of an electrical corporation operating a facility.
(3)Skilled and trained workforce has the same meaning as set forth in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(b)The commission shall establish a special rate structure for large-scale energy users that does both of the following:
(1)Protects other customers of an electrical corporation and prevents cost shifts to those other customers.
(2)(A)Requires the large-scale energy user pay for the electrical corporations upfront costs for transmission or distribution infrastructure upgrades necessary to provide electrical service to the large-scale energy user.
(B)The upfront costs described in subparagraph (A) shall not be recovered by the electrical corporation from other customers of the electrical corporation.
(c)(1)A large-scale energy user shall only use onsite solar or wind generation and a battery electric storage system as backup power generation for the facility.
(2)A large-scale energy user that uses battery electric storage systems shall enter into a binding agreement with the local fire department to ensure adequate fire protection services are available, including fire protection for the battery electric storage system and dire response times for communities in proximity to the facility.
(d)(1)Notwithstanding paragraph (1) of subdivision (a) of Section 1720 of the Labor Code, construction of a facility constitutes a public works project for purposes of Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code.
(2)A contractor who enters into a contract to perform work on a facility shall do all of the following:
(A)The contractor shall pay each construction worker employed in the execution of the work, at minimum, the general prevailing rate of per diem wages, except that an apprentice registered in a program approved by the Chief of the Division of Apprenticeship Standards shall be paid, at minimum, the applicable apprentice prevailing rate.
(B)The contractor shall maintain and verify payroll records pursuant to Section 1776 of the Labor Code and make those records available for inspection and copying as provided in that section. Notwithstanding Section 1776 of the Labor Code, the contractor shall not be required to provide copies of certified payroll records to any entity other than the Department of Industrial Relations and the commission.
(C)The contractor shall biannually, on July 1 and December 31 of each year, submit to the commission digital copies of its certified payroll records, in a format consistent with systems used for compliance with Section 1776 of the Labor Code, for projects subject to this section. The commission shall retain these records as public records for five years.
(3)The requirement imposed in subparagraph (A) of paragraph (2) may be enforced through any of the following mechanisms:
(A)Within 18 months after completing the facility, by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code.
(B)By an underpaid construction worker or apprentice through an administrative complaint or civil action.
(C)By a joint labor-management committee through a civil action pursuant to Section 1771.2 of the Labor Code.
(4)If a willful violation of this subdivision has been enforced against a contractor for the construction of a facility pursuant to paragraph (3), that facility shall remain eligible to receive service pursuant to the rate structure established pursuant to subdivision (b) if restitution has been made to the affected workers and all associated penalties and fines have been paid.
(5)The commission shall require each large electrical corporation to include the requirements of this subdivision in each interconnection agreement with a large-scale energy user.
(6)This subdivision does not apply to a construction of a facility that is a public work, as defined in Section 1720 of the Labor Code, and that is subject to Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code.
(7)(A)The entity that engaged the contractor to perform work on a facility is not an awarding body, as defined in Section 1722 of the Labor Code. Public works project requirements not codified in this section do not apply to the entity. This section does not affect the entitys liability for nonpayment of wages or materials under Section 3 of Article XIV of the California Constitution.
(B)The contractor who enters into a contract with the entity described in subparagraph (A) to perform work on a facility is the awarding body only for the limited purposes of Section 1773.3 of the Labor Code.
(8)(A)All contracts for the construction of a facility shall require every contractor and subcontractor at every tier to use a skilled and trained workforce for the construction of the facility.
(B)Every contractor and subcontractor at every tier shall use a skilled and trained workforce for the construction of the facility.
SEC. 2.Section 913.11 of the Public Utilities Code is amended to read:913.11.(a)Notwithstanding Section 10231.5 of the Government Code, the commission, Energy Commission, and State Air Resources Board shall, in consultation with all California balancing authorities, as defined in subdivision (d) of Section 399.12, as part of a public process, issue a joint report to the Legislature by January 1, 2021, and at least every four years thereafter.
(b)The joint report shall include all of the following:
(1)A review of the policy described in subdivision (a) of Section 454.53, focused on technologies, forecasts, then-existing transmission, and maintaining safety, environmental and public safety protection, affordability, and system and local reliability.
(2)An evaluation identifying the potential benefits and impacts on system and local reliability associated with achieving the policy described in subdivision (a) of Section 454.53.
(3)An evaluation identifying the nature of any anticipated financial costs and benefits to electrical, gas, and water utilities, including customer rate impacts and benefits.
(4)The barriers to, and benefits of, achieving the policy described in subdivision (a) of Section 454.53.
(5)Alternative scenarios in which the policy described in subdivision (a) of Section 454.53 can be achieved and the estimated costs and benefits of each scenario.
(6)An evaluation of the impacts of large-scale energy users, as defined in Section 740.22, on the states ability to achieve the policy described in subdivision (a) of Section 454.53.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| May 14, 2026 | May 14 hearing: Held in committee and under submission. |
| May 8, 2026 | Set for hearing May 14. |
| Apr 20, 2026 | April 20 hearing: Placed on APPR. suspense file. |
| Apr 10, 2026 | Set for hearing April 20. |
| Apr 8, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 3. Noes 1. Page 3794.) (April 8). Re-referred to Com. on APPR. |
| Apr 8, 2026 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 3. Noes 1.) (April 8). Re-referred to Com. on APPR. |
| Mar 26, 2026 | Set for hearing April 8. |
| Mar 23, 2026 | Read second time and amended. Re-referred to Com. on L., P.E. & R. |
| Mar 19, 2026 | From committee: Do pass as amended and re-refer to Com. on L., P.E. & R. (Ayes 12. Noes 4. Page 3588.) (March 17). |
| Mar 19, 2026 | From committee: Do pass as amended and re-refer to Com. on L., P.E. & R. (Ayes 12. Noes 4.) (March 17). |
| Mar 9, 2026 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on E., U & C. |
| Mar 9, 2026 | Set for hearing March 17. |
| Feb 11, 2026 | Referred to Coms. on E., U & C. and L., P.E. & R. |
| Feb 5, 2026 | From printer. May be acted upon on or after March 7. |
| Feb 4, 2026 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Apr 20, 2026 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 8, 2026 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Labor, Public Employment and Retirement |
Passed |
|
| Mar 17, 2026 | Do pass as amended, but first amend, and re-refer to the Committee on [Labor, Public Employment and Retirement ] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Asian Americans and Pacific Islanders for Civic Empowerment | ** Support | |
| Asian Pacific Environmental Network Action | ** Support | |
| Associated General Contractors | ** Against | |
| Bay Area Council | ** Against | |
| Brightline Defense | ** Support | |
| Building Owners and Managers Association of California | ** Against | |
| CalAsian Chamber of Commerce | ** Against | |
| California African American Chamber Of Commerce | ** Against | |
| California Business Properties Association | ** Against | |
| California Chamber Of Commerce | ** Against | |
| California Environmental Voters | ** Support | |
| California Hispanic Chamber Of Commerce | ** Against | |
| California Large Energy Consumers Association | ** Against | |
| Center For Biological Diversity | ** Support | |
| Center on Race, Poverty & the Environment | ** Support | |
| City of Monterey Park | ** Support | |
| Climate Action California | ** Support | |
| Climate Center | ** Support | |
| Data Center Coalition | ** Against | |
| Earthjustice | ** Support | |
| Enchanted Rock, LLC | ** Against | |
| Leadership Counsel for Justice and Accountability | ** Support | |
| Naiop California | ** Against | |
| Natural Resources Defense Council | ** Support | |
| Pacific Gas And Electric Company | ** Against | |
| San Diego Gas and Electric Company | ** Against | |
| Sierra Club California | ** Support | |
| Silicon Valley Leadership Group | ** Against | |
| Southern California Gas Company | ** Against | |
| Teamsters California | ** Support | |
| Techca | ** Against | |
| Technet | ** Against | |
| USGBC California | ** Support | |
| Western States Petroleum Association | ** Against |
SENATE COMMITTEE ON
Senator Sabrina Cervantes, Chair
2025 - 2026 Regular Session
SB 978 (Pérez) - Data centers: labor: electricity rates
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would direct the California Public Utilities Commission (CPUC) to establish a special rate structure for data centers taking transmission level electrical service with an estimated peak demand of at least 75 megawatts, as specified. This bill would also require a contractor who enters a contract to perform work on a data center facility to abide by specified public works requirements and use a skilled and trained workforce.
Fiscal Impact:
- The CPUC estimates ongoing costs of about $683,000 annually (ratepayer funds) for development and oversight of a new data center tariff.
- To the extent that this bill results in increased or decreased electricity rates, it could impact the state as an electrical utility ratepayer.
Background:
The growth of data centers – particularly those data centers that support generative artificial intelligence (AI) – is leading to increased energy costs in many US states. As electricity demands from data centers increase, grid and utility costs are also increasing. Pennsylvania – New Jersey – Maryland Interconnection (PJM) operates the largest regional grid in the United States. In January 2026, data from PJM indicated that 40% of its expected increased electricity demand will come from data centers. With this increase in electricity demand, PJM has seen record high costs for electricity to meet future reliability needs. The supply of reliability resources has also fallen short of the amount needed to meet demand in PJM states. In addition to these higher costs to meet power capacity demands, transmission and distribution rates have also risen. Four of the states in PJM territory paid over $4 billion in 2024 for data center transmission costs, with more costs anticipated over the following years. In the wake of consumer concerns about higher costs and reliability challenges, PJM has increased scrutiny of energy resources for data centers and data center growth in its territory. However, data center load growth is increasing as demand for AI and cloud computing services increases. A number of data centers have sought to address their needs for reliable power resources and limit cost concerns by building their own power facilities and co-locating data centers with generation facilities. However, a number of factors, including policy limitations by the Federal Energy Regulatory Commission, include the availability of suitable generation, and the length of time needed to site and construct new facilities has limited data centers’ reliance on co-located power. On March 4, 2026, the White House released a voluntary pledge aimed at protecting ratepayers from cost shifts caused by data center growth. The Trump Administration has called on data centers to voluntarily sign onto this pledge. However, the pledge does not include any enforceable mechanisms to ensure that ratepayer costs driven by data centers do not increase.
Proposed Law:
This bill would:
- Direct the CPUC to establish a special rate structure for data centers taking transmission level electrical service with an estimated peak demand of at least 75 megawatts.
- Specify that the special rate structure must do all of the following:
- Protect other customers of an electrical corporation and prohibit cost shifts to those other customers.
- Require the data center pay for the electrical corporation’s upfront costs for transmission or distribution infrastructure upgrades necessary to provide electrical service to the large-scale energy user. Electrical corporations shall not recover costs associated with these expenses from other utility customers.
- Enable a data center’s rate structure to prefund a 15-year contract through the electrical corporation for the installation of new, incremental, zero-carbon energy resources to function as dispatchable reliability assets within the utility service territory.
- Ensure that charges generally included in the generation component of a customer bill can be assessed separately from charges generally included in the transmission and distribution component of a customer’s bill.
- Provide that an electrical corporation tariff established pursuant to these provisions shall only apply to those facilities for which a new transmission interconnection agreement is established after the adoption of the rate structure established pursuant to these provisions or on a later date specified by the CPUC.
- Provide that construction of a data center subject to the special rate structure constitutes a public works project for purposes of establishing wages for workers engaged in the execution of the work (Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code).
- Require a contractor who enters into a contract to perform work on a facility to do all of the following:
- The contractor shall pay each construction worker employed in the execution of the work, at minimum, the general prevailing rate of per diem wages, except that an apprentice registered in a program approved by the Chief of the Division of Apprenticeship Standards shall be paid, at minimum, the applicable apprentice prevailing rate.
- The contractor shall maintain and verify payroll records and make those records available for inspection and copying, as specified. The contractor shall not be required to provide copies of certified payroll records to any entity other than the CPUC and DIR.
- The contractor shall biannually, on July 1 and December 31 of each year, submit to the CPUC digital copies of its certified payroll records, as specified. Requires the CPUC to retain these records as public records for five years.
- Provide that the prevailing wage requirement, specified in 5), may be enforced through the following mechanisms:
- Within 18 months after completing the facility, by the LC through the issuance of a civil wage and penalty assessment, as specified.
- By an underpaid construction worker or apprentice through an administrative complaint or civil action.
- By a JLMC through a civil action.
- Provide that if a willful violation of the prevailing wage requirement has been enforced against a contractor for the construction of a facility, as specified, that facility shall remain eligible to receive service pursuant to the rate structure established in 1) if restitution has been made to the affected workers and all associated penalties and fines have been paid.
- Specify that these provisions do not apply to the construction of a facility that is already a public work, as defined in Section 1720 of the Labor Code, and that is subject to Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code.
- Provide that the entity that engaged the contractor to perform work on a facility is not an awarding body, as specified. Public works projects not codified in these provisions do not apply to the entity. This section does not affect the entity’s liability for nonpayment of wages or materials under Section 3 of Article XIV of the California Constitution.
- Provide that the contractor who enters into a contract with the entity described in 9) is the awarding body only for the limited purposes of Section 1773.3 of the Labor Code. Section 1773.3 of the Labor Code requires awarding bodies to notify DIR of any public works contract and prohibits the use of unregistered contractors or subcontractors, as specified.
- Require all contracts for the construction of a facility to require every contractor and subcontractor at every tier to use a STW. STW has the same meaning as set forth in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
- Direct the CPUC to require each large electrical corporation to include the prevailing wage, recordkeeping, and STW requirements in each interconnection agreement with a large-scale energy user.
- Expand items that must be included in CPUC-led joint agency reporting requirements regarding renewable and zero-carbon procurement goals to include an evaluation of large-scale energy user impacts on the state’s renewable and zero-carbon energy procurement goals.
- Define “data center” as a facility that primarily contains electronic equipment used to process, store, and transmit digital information, that may be a free-standing structure or a facility within a larger structure, and that uses environmental control equipment to maintain the proper conditions for the operation of electronic equipment. Data center does not include any publicly funded research facility, public safety facility, national security facility, publicly owned facility, and other utility facility, including, but not limited to, an asset of a facilities-based telecommunications provider.
- Define “facility” as physical property, a plant, a building, a structure, a source, or stationary equipment, located on one or more contiguous or adjacent properties in actual physical contact or separated solely by a public roadway or public right-of-way and under common ownership or common control. Facility does not include a facility that introduces a new load as a result of switching from fossil fuels to renewable fuels or transportation electrification activities.
Related Legislation:
SB 886 (Padilla, 2026) requires the CPUC to establish an electrical corporation tariff that addresses costs associated with transmission, distribution, and generation services for new large electrical customers that interconnect at the transmission level and have peak electricity demands of at least 75 MW. The bill would also specify components that must be included in the tariff, and it would encourage local POUs to adopt similar tariffs.
SB 887 (Padilla, 2026) would establish certain permitting permissions for data centers that meet specified criteria. These criteria include provisions similar to the requirements for the tariff specified in SB 886 (Padilla, 2026).
SB 1168 (McNerney, 2026) would establish a tax on data centers’ energy consumption over a specified threshold.
SB 1185 (Cortese, 2026) would require an owner, operator, or developer of a facility that will be used for the research, development, or production of pharmaceutical products to, when contracting for the performance of initial and subsequent construction, alteration, demolition, installation, repair, or maintenance work on the facility, require that its contractors and any subcontractors use a STW to perform all onsite work within an apprenticeable occupation in the building and construction trades.
AB 1104 (Pellerin, Chapter 632, Statutes of 2025) among other things, clarified that for the construction of a renewable electrical generation facility and associated battery storage, the contractor who enters into a contract with the entity, not the entity itself, is the awarding body only for limited purposes and specified which public works requirements apply to such construction projects.
SB 1298 (Cortese, 2024) would have authorized the California Energy Commission, until January 1, 2030, to exempt from its certification a thermal powerplant with a generating capacity of up to 150 megawatts, if specified requirements are met, including that the power plant is used solely as a backup generation facility for a data center and that a STW is used to perform all construction work on the facility, as specified. SB 1298 was held in Assembly Rules Committee.
AB 2143 (Carrillo, Chapter 744, Statutes of 2022) extended public works requirements to the construction of any renewable electrical generation facility and any associated battery storage after December 31, 2023.
-- END --
SENATE COMMITTEE ON LABOR, PUBLIC EMPLOYMENT AND RETIREMENT
Senator Lola Smallwood-Cuevas, Chair
2025 - 2026 Regular
Bill No: SB 978 Hearing Date: April 8, 2026
Author: | Pérez | ||
Version: | March 23, 2026 | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Emma Bruce | ||
SUBJECT: Data centers: labor: electricity rates
KEY ISSUE
This bill directs the California Public Utilities Commission to establish a special rate structure for data centers taking transmission level electrical service with an estimated peak demand of at least 75 megawatts, as specified. This bill also requires a contractor who enters a contract to perform work on a data center facility to abide by specified public works requirements and use a skilled and trained workforce.
ANALYSIS
Existing law:
- Establishes and vests the California Public Utilities Commission (CPUC) with regulatory authority over public utilities, including electrical corporations and gas corporations. (California Constitution, Article XII)
- Authorizes the CPUC to set rates for public utilities and specifies that every cost charged by utilities to customers must be just and reasonable. (Public Utilities Code §451)
- Defines an electrical corporation as every corporation or person owning, controlling, operating, or managing any electric plant for compensation within this state, except where electricity is generated on or distributed by the producer through private property solely for its own use or the use of its tenants and not for sale or transmission to others. (Public Utilities Code §218)
- Establishes within the Department of Industrial Relations (DIR), various entities including the Division of Labor Standards Enforcement under the direction of the Labor Commissioner (LC) and empowers the LC to ensure a just day’s pay in every workplace and to promote justice through robust enforcement of labor laws. (Labor Code §79-107)
- Defines “public works” as, among other things, construction, alteration, demolition, installation, or repair work done under contract and paid for, in whole or in part, out of public funds, except work done directly by a public utility company pursuant to order of the CPUC or other public authority. (Labor Code §1720(a))
- Requires that not less than the general prevailing rate of per diem wages be paid to all workers employed on a “public works” project costing over $1,000 dollars and imposes misdemeanor penalties for violation of this requirement. (Labor Code §1771)
- Requires an awarding body to provide notice to DIR of any public works contract subject to public works law, within 30 days of the award, but in no event later than the first day in which a contractor has workers employed upon the public work. (Labor Code §1773.3(a))
- Provides that an awarding body that fails to provide the notice required in 7) or that enters into a contract with or permits an unregistered contractor or subcontractor to engage in the performance of any public work shall, in addition to any other sanction or penalty authorized by law, be subject to a civil penalty of 100 for each day in violation of either requirement, not to exceed an aggregate penalty of 10,000 for each project. (Labor Code §1773.3(c))
- Requires each contractor and subcontractor to keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by the contractor or subcontractor in connection with the public work. (Labor Code §1776 (a))
- Requires the payroll records in 9) to be certified and made available for inspection to all of the following:
- An employee’s certified payroll record must be made available for inspection or furnished to the employee or the employee’s authorized representative, upon request.
- All CPRs must be made available for inspection or furnished upon request to a representative of the body awarding the contract and the LC.
- All CPRs must be made available upon request by the public for inspection or for copies thereof.
(Labor Code §1776(b))
- Requires the LC to, with reasonable promptness, issue a civil wage and penalty assessment to the contractor or subcontractor, or both, if the LC or their designee determines after an investigation that there has been a violation of public works law. (Labor Code §1741(a))
- Authorizes a joint labor-management committee (JLMC) to bring an action in any court of competent jurisdiction against an employer that fails to pay the prevailing wage to its employees or that fails to provide certified payroll records, as specified. (Labor Code §1771.2)
- Defines a “skilled and trained” workforce (STW) as a workforce that meets both of the following conditions:
- All the workers performing work in an apprenticeable occupation in the building and construction trades are either skilled journeypersons or apprentices registered in an apprenticeship program approved by the Division of Apprenticeship Standards (DAS).
- At least 60% of the skilled journeypersons employed to perform work on the contract or project by every contractor and each of its subcontractors at every tier are graduates of an apprenticeship program for the applicable occupation, as specified.
(Public Contract Code §2601)
- Authorizes a public entity to require a bidder, contractor, or other entity to use a STW to complete a contract or project regardless of whether the public entity is required to do so by statute or regulation. Specific requirements apply when a public entity is required by statute or regulation to obtain an enforceable commitment that a bidder, contractor, or other entity will use a STW. (Public Contract Code §2600)
- Requires a public entity, when the use of a STW to complete a contract or project is required, to include in all bid documents and construction contracts a notice that the project is subject to the STW requirement. (Public Contract Code §2600(c))
This bill:
- Directs the CPUC to establish a special rate structure for data centers taking transmission level electrical service with an estimated peak demand of at least 75 megawatts.
- Specifies that the special rate structure must do all of the following:
- Protect other customers of an electrical corporation and prohibit cost shifts to those other customers.
- Require the data center pay for the electrical corporation’s upfront costs for transmission or distribution infrastructure upgrades necessary to provide electrical service to the large-scale energy user. Electrical corporations shall not recover costs associated with these expenses from other utility customers.
- Enable a data center’s rate structure to prefund a 15-year contract through the electrical corporation for the installation of new, incremental, zero-carbon energy resources to function as dispatchable reliability assets within the utility service territory.
- Ensure that charges generally included in the generation component of a customer bill can be assessed separately from charges generally included in the transmission and distribution component of a customer’s bill.
- Provides that an electrical corporation tariff established pursuant to these provisions shall only apply to those facilities for which a new transmission interconnection agreement is established after the adoption of the rate structure established pursuant to these provisions or on a later date specified by the CPUC.
- Provides that construction of a data center subject to the special rate structure constitutes a public works project for purposes of establishing wages for workers engaged in the execution of the work (Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code).
- Requires a contractor who enters into a contract to perform work on a facility to do all of the following:
- The contractor shall pay each construction worker employed in the execution of the work, at minimum, the general prevailing rate of per diem wages, except that an apprentice registered in a program approved by the Chief of the Division of Apprenticeship Standards shall be paid, at minimum, the applicable apprentice prevailing rate.
- The contractor shall maintain and verify payroll records and make those records available for inspection and copying, as specified. The contractor shall not be required to provide copies of certified payroll records to any entity other than the CPUC and DIR.
- The contractor shall biannually, on July 1 and December 31 of each year, submit to the CPUC digital copies of its certified payroll records, as specified. Requires the CPUC to retain these records as public records for five years.
- Provides that the prevailing wage requirement, specified in 5), may be enforced through the following mechanisms:
- Within 18 months after completing the facility, by the LC through the issuance of a civil wage and penalty assessment, as specified.
- By an underpaid construction worker or apprentice through an administrative complaint or civil action.
- By a JLMC through a civil action.
- Provides that if a willful violation of the prevailing wage requirement has been enforced against a contractor for the construction of a facility, as specified, that facility shall remain eligible to receive service pursuant to the rate structure established in 1) if restitution has been made to the affected workers and all associated penalties and fines have been paid.
- Specifies that these provisions do not apply to the construction of a facility that is already a public work, as defined in Section 1720 of the Labor Code, and that is subject to Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code.
- Provides that the entity that engaged the contractor to perform work on a facility is not an awarding body, as specified. Public works projects not codified in these provisions do not apply to the entity. This section does not affect the entity’s liability for nonpayment of wages or materials under Section 3 of Article XIV of the California Constitution.
- Provides that the contractor who enters into a contract with the entity described in 9) is the awarding body only for the limited purposes of Section 1773.3 of the Labor Code. Section 1773.3 of the Labor Code requires awarding bodies to notify DIR of any public works contract and prohibits the use of unregistered contractors or subcontractors, as specified.
- Requires all contracts for the construction of a facility to require every contractor and subcontractor at every tier to use a STW. STW has the same meaning as set forth in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
- Directs the CPUC to require each large electrical corporation to include the prevailing wage, recordkeeping, and STW requirements in each interconnection agreement with a large-scale energy user.
- Expands items that must be included in CPUC-led joint agency reporting requirements regarding renewable and zero-carbon procurement goals to include an evaluation of large-scale energy user impacts on the state’s renewable and zero-carbon energy procurement goals.
- Defines “data center” as a facility that primarily contains electronic equipment used to process, store, and transmit digital information, that may be a free-standing structure or a facility within a larger structure, and that uses environmental control equipment to maintain the proper conditions for the operation of electronic equipment. Data center does not include any publicly funded research facility, public safety facility, national security facility, publicly owned facility, and other utility facility, including, but not limited to, an asset of a facilities-based telecommunications provider.
- Defines “facility” as physical property, a plant, a building, a structure, a source, or stationary equipment, located on one or more contiguous or adjacent properties in actual physical contact or separated solely by a public roadway or public right-of-way and under common ownership or common control. Facility does not include a facility that introduces a new load as a result of switching from fossil fuels to renewable fuels or transportation electrification activities.
COMMENTS
1. Background:
This analysis is limited to the bill’s prevailing wage and STW provisions. Please see the Senate Energy, Utilities and Communications Committee’s analysis for background on the CPUC and data centers.
Public Works Requirements
All contractors working on “public works” projects are required to abide by a set of laws that ensure the responsible use of public funds. Among other requirements, this means registering the project with DIR, paying prevailing wages, and maintaining accurate payroll records. SB 978 would apply specified public works requirements to the construction of data centers subject to the special rate structure developed by the CPUC. Below is a brief overview of the public works requirements relevant to this bill.
Awarding bodies are required to notify DIR of public works contracts and to ensure all contractors utilized on the project are registered. Awarding bodies use the PWC-100 form on DIR’s website to fulfill this notification requirement. The form contains the name and registration number issued by DIR of the contractor and any subcontractor listed on the successful bid, the bid and contract award dates, the contract amount, the estimated start and completion dates, and the jobsite location. This bill would specify that the entity that engaged the contractor to perform work on a data center is not an awarding body, thus relieving them of the administrative responsibilities associated with public works projects. Instead, the contractor who performs work on the data center would be required to act as the awarding body for limited purposes, including registering the project with DIR.
Contractors would be required to pay each construction worker employed to work on the data center, at minimum, the general prevailing rate of per diem wages. The prevailing wage rate is the basic hourly rate paid on public works projects to a majority of workers engaged in a particular craft, classification or type of work within the locality and in the nearest labor market area. The Director of DIR issues wage determinations semiannually, on February 22 and August 22. In determining the rates, the Director ascertains and considers the applicable wage rates established by collective bargaining agreements and the rates that may have been predetermined for federal public works. Under this bill, prevailing wage violations would be enforced by the LC, an underpaid construction worker, or a JLMC, as specified.
Contractors performing work on a data center would also be required to maintain accurate payroll records and submit certified copies of those records biannually to the CPUC and DIR. Records must contain the name, address, social security number, work classification, straight time, and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by the contractor or subcontractor in connection with the work. Certified payroll records are an essential tool for combatting wage theft. Unlike on public works projects, which require certified payroll records to be made available to the public, as specified, this bill would only require copies of certified payroll records to be provided to the CPUC and DIR.
What is a Skilled and Trained Workforce (STW)?
In addition to complying with specified public works requirements, contractors would be required to use a STW for the construction of a data center facility. Rather than referencing Public Contract Code Section 2601, which contains the definition of a STW, SB 978 references the entire Public Contract Code Chapter that contains all STW requirements. Below is a brief over of STW requirements.
A “skilled and trained” workforce is one in which all workers performing work in an apprenticeable occupation in the building and construction trades are either skilled journeypersons[1] or apprentices registered in a DAS-approved apprenticeship program. Additionally, at least 60% of the skilled journeypersons employed to perform work on the contract or project are graduates of either an in-state, DAS-approved apprenticeship program or an out-of-state, federally-approved apprenticeship program. Individuals who qualify as skilled journeypersons based on their on-the-job experience do not count towards the 60% minimum graduation requirement. STW requirements ensure high-quality construction projects and invest in the State’s apprenticeship programs by increasing demand for graduates.
A public entity can be required, by statute or regulation, to obtain an enforceable commitment that a bidder, contractor, or other entity will use a STW to complete a contract or project. Even in the absence of a statute or regulation, a public entity can mandate the use of a STW. When a STW is required, the public entity shall include a notice in all bid documents and construction contracts. However, the failure of a public entity to provide a notice does not excuse a bidder, contractor, or other entity from the obligation to use a STW if such a requirement is imposed by a statute or regulation.
When a contractor is required to use a STW, they commit to doing so in an enforceable agreement with the public entity or awarding body. As part of this agreement, a contractor submits monthly reports to the public entity that demonstrate their compliance and their subcontractors’ compliance at every tier. Reports include the full name of each worker and the name, location, and graduation date of their completed apprenticeship program.
If a contractor fails to provide a monthly report or provides an incomplete one, the public entity will withhold payments until compliance is achieved and notify the LC for issuance of a civil penalty. For the public entity to resume payments, a contractor must submit a substantial compliance plan.
2. Comments:
Over the past five years data center construction has surged across the country. In 2026 alone, the top A.I. companies forecast spending $710 billion on data centers.[2] For these companies, procuring huge amounts of computing power as quickly as possible is essential to building A.I. models faster than their competition. Building data centers, however, is not without controversy. Fierce resistance from local communities delayed or cancelled $98 billion worth of projects in the second half of 2025.[3] Concerns over data centers’ economic, environmental, and health impacts have driven this resistance. Specifically, consumers worry that the costs of the increased electricity demand and infrastructure upgrades will be passed down to them. In California, residents of Monterey Park and Imperial Valley organized to protest the construction of local data centers.[4] Although community concerns complicate the process, construction is still proceeding at a rapid pace. Purchases of the equipment that goes into data centers have not slowed down.[5]
Notwithstanding their controversies, data centers are undeniably a boon to electrical workers. The International Brotherhood of Electrical Workers (IBEW) estimates between 45% and 70% of the entire budget for data center construction goes to the electrical subcontractor.[6] In Northern Virgina, which has the largest data center market in the county, IBEW members do close to 97% of the work.[7] The Sacramento-Sierra’s Building and Construction Trades Council, on behalf of 19 trade unions, recently signed a project labor agreement for a new data center in the Sacramento region.[8] Union jobs provide high wages and good benefits that reverberate through communities, so resistance to data center construction can have serious economic consequences.[9]
Prevailing wage and STW requirements typically apply to publicly funded projects, not privately funded ones. Recently, the Legislature has extended these requirements to certain privately funded projects to prevent worker exploitation and promote the creation of a skilled workforce. SB 978 seeks to address ratepayer concerns about utility costs by requiring the CPUC to establish a special rate structure for data centers, as specified, while requiring specified public works requirements and a STW for data center construction.
3. Double Referral:
The Senate Rules Committee referred this bill to the Senate Energy, Utilities and Communications Committee, where it passed on a 12-4 vote, and the Senate Labor, Public Employment and Retirement Committee.
4. Need for this bill?
According to the author:
“Data centers have been a growing topic of concern across the state as many new projects are popping up. Among concerns stemming from data centers are their threat to rate payer affordability. Typically hyper-scale data centers need transmission infrastructure built for their significant energy consumption itself. It is currently not clear in statute that these transmission construction costs or a data centers’ large energy use would be paid for by the data center operator itself, thus posing the threat that these costs shift to ratepayers. SB 978 will address those concerns by providing clarity towards that problem of impact to rate payers.
In addition to rate payer affordability, [SB 978] also seeks to ensure that data centers are well constructed, with the inclusion in state statue of requirements that the affiliated workforce be hired with strong labor standards and protections…Data centers are complex and large facilities that require trained and specialized skilled labor to be built and operated in as safe a manner as they can be.
Currently there isn’t anything in statute that requires data centers to be built by a skilled and trained workforce with prevailing wage. Moreover, once a data center is built, they do not have the need to employ many workers for the day-to-day operations. With this acknowledgement of the lean workforce for day-to-day operations of a data center it is important to capitalize on them employing a California workforce for the construction of a project…”
5. Proponent Arguments:
The Teamsters support the measure, arguing:
“SB 978 instructs the Californian Public Utility Commission to create a special rate structure for large scale energy users such that the cost of service is not placed upon the general ratepayer. It also establishes clear labor standards and enforcement of those standards for the construction of these large-scale energy user facilities…
We believe that large corporate energy users should pay their fair share and that any work done in California should be good jobs with prevailing wage, skilled and trained workforce, and good enforcement mechanisms for labor violations. SB 978 protects workers and their rights in the workplace, affordable utility rates for ratepayers, and the utilities from rising operation costs from large-scale customers.”
The Climate Center also supports the measure, arguing:
“California already hosts roughly one-third of U.S. data centers. The California Energy Commission (CEC) also estimates that data center demand on the electrical grid will grow by 3.3 gigawatts by 2035. These are enormous energy needs, and we must ensure Californians are protected from potential cost shifts while safeguarding the state’s climate goals…
SB 978 strikes the right balance between protection, regulation, and fair operating practices. It ensures that data centers pay their fair share, requires backup diesel generators to meet clean-energy standards, directs the CEC to assess how data centers affect the state’s ability to meet its climate goals, and mandates the use of union labor for all data centers built in California.”
6. Opponent Arguments:
The Association of General Contractors opposes the measure, arguing:
“[SB 978] would impose unprecedented labor mandates on privately financed data center construction as a condition of receiving a utility rate structure. While the intent to protect ratepayers is understandable, the bill takes the extraordinary step of declaring these privately financed projects to be “public works” solely because they meet a certain megawatt threshold and opt into a utility rate structure.
Under long-standing California law, a project qualifies as public works only when it is publicly funded, publicly procured, or publicly subsidized. SB 978 sidesteps these criteria entirely. Instead, it creates a statutory fiction by designating private data-center construction as public works even though no public funds are used, and no public contract exists. This represents a significant and unprecedented expansion of public-works authority into the private sector.
By artificially reclassifying private construction as public works, SB 978 mandates prevailing wage, certified payroll, Department of Industrial Relations enforcement, and skilled-and-trained workforce requirements on projects that have historically been governed by private contracting practices. This will narrow the pool of eligible contractors, exclude many small and mid-sized firms, and undermine open and competitive bidding…
The bill further requires developers to bear the full upfront cost of transmission and distribution upgrades, compounding the financial burden created by the public-works designation. The combination of higher capital costs and public-works mandates will make California a less competitive location for data-center investment, reducing opportunities for the state’s diverse construction workforce.”
7. Prior Legislation:
SB 886 (Padilla, 2026) requires the CPUC to establish an electrical corporation tariff that addresses costs associated with transmission, distribution, and generation services for new large electrical customers that interconnect at the transmission level and have peak electricity demands of at least 75 MW. The bill would also specify components that must be included in the tariff, and it would encourage local POUs to adopt similar tariffs. SB 886 is currently pending in the Senate Appropriations Committee.
SB 887 (Padilla, 2026) would establish certain permitting permissions for data centers that meet specified criteria. These criteria include provisions similar to the requirements for the tariff specified in SB 886 (Padilla, 2026). SB 887 is currently pending in the Senate Energy, Utilities, and Communications Committee.
SB 1168 (McNerney, 2026) would establish a tax on data centers’ energy consumption over a specified threshold. SB 1168 is currently pending in the Senate Energy, Utilities and Communications Committee.
SB 1185 (Cortese, 2026) would require an owner, operator, or developer of a facility that will be used for the research, development, or production of pharmaceutical products to, when contracting for the performance of initial and subsequent construction, alteration, demolition, installation, repair, or maintenance work on the facility, require that its contractors and any subcontractors use a STW to perform all onsite work within an apprenticeable occupation in the building and construction trades. SB 1185 is pending in the Senate Labor, Public Employment and Retirement Committee.
AB 1104 (Pellerin, Chapter 632, Statutes of 2025) among other things, clarified that for the construction of a renewable electrical generation facility and associated battery storage, the contractor who enters into a contract with the entity, not the entity itself, is the awarding body only for limited purposes and specified which public works requirements apply to such construction projects.
SB 1298 (Cortese, 2024) would have authorized the California Energy Commission, until January 1, 2030, to exempt from its certification a thermal powerplant with a generating capacity of up to 150 megawatts, if specified requirements are met, including that the power plant is used solely as a backup generation facility for a data center and that a STW is used to perform all construction work on the facility, as specified. SB 1298 was held in Assembly Rules Committee.
AB 2143 (Carrillo, Chapter 744, Statutes of 2022) extended public works requirements to the construction of any renewable electrical generation facility and any associated battery storage after December 31, 2023.
SUPPORT
Asian Americans and Pacific Islanders for Civic Empowerment
City of Monterey Park
Climate Action California
Climate Center
Natural Resources Defense Council
Teamsters California
USGBC California
OPPOSITION
Associated General Contractors
Bay Area Council
Building Owners and Managers Association of California
CalAsian Chamber of Commerce
California African American Chamber of Commerce
California Business Properties Association
California Chamber of Commerce
California Hispanic Chamber of Commerce
California Large Energy Consumers Association
Data Center Coalition
Enchanted Rock, LLC
NAIOP California
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Silicon Valley Leadership Group
Southern California Gas Company
TechCA
Technet
Western States Petroleum Association
-- END --
A “skilled journeyperson” means a worker who either 1) graduated from an in-state apprenticeship program approved by DAS or an out-of-state apprenticeship program, approved by the federal Secretary of Labor or 2) has at least as many hours of on-the-job experience as would be required to graduate from the applicable DAS-approved apprenticeship program. ↑
DePillis, Lydia. “Local Opposition Is Slowing A.I. Data Centers. Wall Street Has Noticed.” New York Times. March 26, 2026. ↑
Christoper, Nilesh. “’You’re a liar.’ Why the world’s biggest building boom has run into a wall in California.” LA Times. April 2, 2026. ↑
Ibid. ↑
DePillis, Lydia. “Local Opposition Is Slowing A.I. Data Centers. Wall Street Has Noticed.” New York Times. March 26, 2026. ↑
IBEW. “The DATA CENTER Surge: A New Generation of IBEW Jobs” May 1, 2025. ↑
Ibid. ↑
Williams, Sheri, “Building Trades Sign PLA for New Data Center.” Sacramento Valley Union Bulletin Board. January 19, 2026. ↑
Economic Policy Institute. “New report details the benefits of unions to workers, communities, and democracy.” EPI. August 20, 2025. ↑
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Benjamin Allen, Chair
2025 - 2026 Regular
Bill No: Hearing Date: 3/17/2026
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill requires the California Public Utilities Commission (CPUC) to create a special rate structure for certain large energy users with capacities of at least 75 megawatts (MW). This bill specifies components that must be included in the rate structure and interconnection agreements for these customers. This bill establishes labor requirements for the construction of facilities subject to this bill. This bill also expands existing CPUC reporting requirements about large loads to include a specified assessment about increased load impacts to renewable procurement goals.
ANALYSIS:
Existing law:
- Authorizes the CPUC to supervise and regulate every public utility in the state and permits the CPUC to do anything that is necessary and convenient to exercise its power and jurisdiction. (Public Utilities Code §701)
- Authorizes the CPUC to set rates for public utilities and specifies that every cost charged by utilities to customers must be just and reasonable. (Public Utilities Code §451)
- Defines an electrical corporation as every corporation or person owning, controlling, operating, or managing any electric plant for compensation within this state, except where electricity is generated on or distributed by the producer through private property solely for its own use or the use of its tenants and not for sale or transmission to others. (Public Utilities Code §218)
- Defines a “retail seller” as an entity engaged in the retail sale of electricity to end-use customers located within the state. This definition expressly includes investor-owned utilities (IOUs), community choice aggregators (CCAs), and energy service providers (ESPs); however, this definition does not include the Department of Water Resources (DWR), publicly owned utilities (POUs), or co-generation facilities. (Public Utilities Code §399.12(j))
- Creates the Renewables Portfolio Standard (RPS) by establishing a state goal of procuring at least 60% of total retail sales of electricity from renewable energy resources by December 31, 2030, with specified benchmarks up to that date. Existing law requires the CPUC to oversee electrical corporations’ compliance with renewable energy procurement mandates and requires the California Energy Commission (CEC) to oversee POU renewable energy procurement compliance. (Public Utilities Code §399.11 et. seq.)
- Establishes a policy to source 100% of all in-state retail electricity sales from zero-carbon resources by December 31, 2045. Existing law requires the CPUC, CEC and the California Air Resources Board (CARB) to incorporate this policy into all relevant plans. Existing law also requires the CPUC to submit a joint report to the Legislature every four years with the CEC, CARB, and electric balancing authorities on costs and benefits associated with state plans for renewable and zero-carbon procurement, and barriers to achieving state procurement goals. (Public Utilities Code §454.53)
- Authorizes the CPUC to assess the extent to which electrical corporation costs for new loads from data centers result in cost shifts to other electrical corporation customers. Existing law specifies that this assessment must be published by January 1, 2027, and it must include the following:
- An analysis of potential electrical corporation costs associated with utility procurement for data center electricity consumption.
- An analysis of potential electrical corporation costs associated with new transmission and distribution assets to serve new data centers or expansions of existing data centers, as specified.
- Identification of opportunities to address any substantial cost shifts. (Public Utilities Code §913.22)
This bill:
- Requires the CPUC to establish a special rate structure for large-scale energy customers of an electric corporation that operate a facility with at least 75 MW.
- Specifies that this special rate structure must do the following:
- Protect other customers of the electrical corporation by preventing cost shifts to other customers.
- Require the large-scale energy customers to pay the electric corporation’s upfront costs for transmission and distribution infrastructure upgrades needed to provide electrical service to large-scale energy customer facility. This bill specifies that electrical corporations may not recover costs associated with these expenses from other utility customers.
- Prohibits a large-scale energy from using backup power that is not onsite solar, wind, or battery generation.
- Requires a large-scale energy customer with backup battery power to enter into a binding agreement with the local fire department to ensure adequate fire services are available to provide fire protection needs for the batteries and nearby communities.
- Specifies that the construction of a large-scale energy consumer’s facility shall be deemed a public works project for the purposes of establishing the wages for workers engaged in the construction of the facility. This bill establishes additional specified labor requirements for the construction of these facilities.
- Expands items that must be included in CPUC-led joint agency reporting requirements regarding renewable and zero-carbon procurement goals to include an evaluation of large-scale energy user impacts on the state’s renewable and zero-carbon energy procurement goals.
Background
Data center growth has spurred ratepayer concerns about utility costs to meet large load needs. The growth of data centers – particularly those data centers that support generative artificial intelligence (AI) – is leading to increased energy costs in many US states. As electricity demands from data centers increase, grid and utility costs are also increasing. Pennsylvania – New Jersey – Maryland Interconnection (PJM) operates the largest regional grid in the United States. In January 2026, data from PJM indicated that 40% of its expected increased electricity demand will come from data centers. With this increase in electricity demand, PJM has seen record high costs for electricity to meet future reliability needs. The supply of reliability resources has also fallen short of the amount needed to meet demand in PJM states. In addition to these higher costs to meet power capacity demands, transmission and distribution rates have also risen. Four of the states in PJM territory paid over $4 billion in 2024 for data center transmission costs, with more costs anticipated over the following years. In the wake of consumer concerns about higher costs and reliability challenges, PJM has increased scrutiny of energy resources for data centers and data center growth in its territory. However, data center load growth is increasing as demand for AI and cloud computing services increases. A number of data centers have sought to address their needs for reliable power resources and limit cost concerns by building their own power facilities and co-locating data centers with generation facilities. However, a number of factors, including policy limitations by the Federal Energy Regulatory Commission, include the availability of suitable generation, and the length of time needed to site and construct new facilities has limited data centers’ reliance on co-located power. On March 4, 2026, the White House released a voluntary pledge aimed at protecting ratepayers from cost shifts caused by data center growth. The Trump Administration has called on data centers to voluntarily sign onto this pledge. However, the pledge does not include any enforceable mechanisms to ensure that ratepayer costs driven by data centers do not increase.
California’s large energy consumers and Pacific Gas & Electric’s (PG&E’s) Rule 30 application. California has not experienced the same level of hyperscaler data center growth seen in other states. In California, data centers increasingly comprise a larger proportion of facilities requesting transmission-level interconnection. However, data centers are not the only large energy consumers receiving electricity at the transmission level. A number of large commercial and industrial facilities are also receiving transmission-level electricity service. These commercial and industrial facilities can include steel, concrete, glass, food processing, fuel refining, and other similar facilities. Some large-load transmission customers are utilities. Water treatment, waste management and telecommunication systems all have facilities that may be large energy consumers that receive electricity at the transmission level. The absence of standard electric rules, including cost sharing mechanisms, and the costs associated with energizing these transmission-level facilities led PG&E to submit an application (A. 24-11-007) to the CPUC to establish a new electric rule (Rule 30) to address standards for interconnecting transmission-level retail electricity customers. In July 2025, the CPUC issued an initial decision (D. 25-07-039) that approved an interim PG&E electric rule for data centers that pre-pay the cost of interconnection. In February 2026, the CPUC issued a schedule for the next phase of the proceeding to consider additional electric rule requirements for transmission interconnection, including mechanisms for covering utility costs. Certain provisions of this bill overlap with issues that are currently included in the ongoing Rule 30 proceeding. To the extent that the CPUC adopts additional decisions that conflict with this bill, this bill may require the CPUC to revise its decisions and potentially re-scope and extend the Rule 30 proceeding.
Bill requires ratepayer protections, but the scope of facilities impacted is unclear. This bill requires the CPUC to adopt a special rate structure to prevent cost shifts associated with a utility’s costs for interconnecting and serving a large-scale energy user. This bill defines a large-scale energy facility as one using at least 75 MW of electricity; however, this definition does not include an existing facility that increases its electrical load for the purposes of transportation electrification or decarbonizing activities that currently use fossil fuels. However, this bill does not explicitly limit the bill’s definition of large-scale energy user to only new facilities requesting a new transmission interconnection. As a result, it is possible that it could capture a wide range of facilities, including existing large energy consumers who already have a transmission interconnection or have executed an agreement for transmission connection. Those facilities captured by this bill’s definition of a large-scale energy user are prohibited from having certain types of on-site backup power, and their ability to enter into certain cost-share arrangements for energy resources is limited by this bill. These provisions are likely infeasible for existing facilities. Additionally, this bill’s backup power provisions are likely infeasible for a number of large-scale energy users because it may be impossible to obtain land parcels large enough to install only on-site solar, wind, and battery behind-the-meter for backup generation.
Bill is one of several measures aimed at preventing cost shifts seen in other states. Both this bill and SB 886 (Padilla, 2026) are aimed at preventing ratepayer cost shifts like those seen in PJM territory. While both bills share similar goals, they differ in the degree of specificity about the mechanism for achieving those goals. While SB 886 specifically requires the CPUC to use a transmission tariff to address cost obligations, this bill requires the CPUC to establish a rate structure to prevent cost shifts. By more broadly requiring the CPUC to establish a rate structure, this bill may provide the CPUC with flexibility to use a variety of different mechanisms to achieve its goals, including a tariff like the one described in SB 886. However, as currently written, this bill and SB 886 differ in the types of facilities to which the bills apply. This bill also does not address utility procurement costs for generation resources needed to meet demands of large energy consumers in addition to existing loads.
Need for Amendments. While this bill appears to envision a rate structure limiting the extent to which new large-scale energy consumers can pass electricity costs on to other utility customers, this bill does not expressly apply only those large-scale energy consumers requesting a new transmission-level connection. This may not be the intent of the author. Additionally, this bill applies to a potentially broad scope of customers, including public and ratepayer-funded facilities that may limit potential ratepayer and public benefits from any tariffs established pursuant to this bill. Provisions of this bill prohibiting large-scale energy consumers from using any form of backup power that is not solar, wind, or battery are likely infeasible in a number of locations in the state. This bill requires the CPUC to ensure that the new rate structure created under this bill protects other customers from rate shifts; however, this bill does not address the need for reliability resources that could limit the need for high-cost generation procurements needed to meet demand if existing resources fall short. For these reasons, the author and committee may wish to amend this bill to do the following:
- Narrow this bill to apply only to large load data centers requesting new transmission interconnections.
- Delete the backup power and fire department consultation provisions of the bill.
- Instead require the CPUC to establish, as part of the rate structure created under this bill, a mechanism by which a large-load customer can pre-fund a 15-year contract for new, incremental, zero-carbon energy resources through the retail electric utility to function as dispatchable reliability assets within the utility service territory.
- Clarify that any tariff established pursuant to this bill shall only apply to those new facilities for which a utility receives a transmission interconnection request after the CPUC adopts a rate structure pursuant to this bill or on a later date specified by the CPUC.
- Require the CPUC to ensure that generation components of a customer’s bill can be assessed separately from the transmission and distribution components of a customer’s bill as part of any rate structure developed under this bill.
- Exempt publicly-funded research facilities, public safety facilities, national security facilities, publicly-owned facilities, and other utility facilities – including facilities-based telecommunications assets from the definition of a data center for the purposes of this bill.
Dual Referral. Should this bill be approved by this committee, it will be re-referred to the Senate Labor, Public Employment and Retirement Committee.
Prior/Related Legislation
SB 886 (Padilla) of 2026, requires the CPUC to establish an electrical corporation tariff that addresses costs associated with transmission, distribution, and generation services for new large electrical customers that interconnect at the transmission level and have peak electricity demands of at least 75 MW. The bill would also specify components that must be included in the tariff, and it would encourage local POUs to adopt similar tariffs. The bill is currently pending in the Senate Energy, Utilities and Communications Committee.
SB 887 (Padilla) of 2026, establishes certain permitting permissions for data centers that meet specified criteria. These criteria include provisions similar to the requirements for the tariff specified in SB 886 (Padilla) of the current legislative session. The bill is pending in the Senate Environmental Quality Committee.
SB 1168 (McNerney) of 2026, establishes a tax on data centers’ energy consumption over a specified threshold. The bill specifies the uses of revenues from the tax, including funding low-income electrical rate assistance programs operated by the IOUs and POUs. The bill is currently pending in the Senate Energy, Utilities and Communications Committee.
SB 57 (Padilla, Chapter 647, Statutes of 2025) authorized the CPUC to assess the extent to which electrical corporation costs for new loads from data centers result in cost shifts to other electrical corporation customers. The bill also required the CPUC to publish and submit a report regarding its assessment to the relevant legislative policy committees by January 1, 2027.
AB 222 (Bauer-Kahan) of 2025, would have required the CPUC to assess the extent to which electrical corporation costs for serving data centers result in cost shifts to other customers. The bill also required the CEC to establish a process for data centers to submit specified energy efficiency data to the CEC, and it required the CEC to assess data centers’ energy consumption. The bill was held in the Senate Appropriations Committee.
SB 1298 (Cortese) of 2024, would have increased the amount of thermal generation a data center could use as backup power from 100 MW to 150 MW without triggering the CEC’s power plant siting process. The bill would have also created conditions for data centers to use this exemption. The bill died in the Assembly.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
Asian Pacific Environmental Network Action, if amended
Brightline Defense, if amended
California Environmental Voters, if amended
Center for Biological Diversity, if amended
Center on Race, Poverty & the Environment, if amended
City of Monterey Park
Climate Action California
Earthjustice, if amended
Leadership Counsel for Justice and Accountability, if amended
Natural Resources Defense Council
Sierra Club California, if amended
Teamsters California
The Climate Center
OPPOSITION:
Bay Area Council, unless amended
CalAsian Chamber of Commerce
California African American Chamber of Commerce
California Chamber of Commerce
California Hispanic Chamber of Commerce
California Large Energy Consumers Association, unless amended
Data Center Coalition
Enchanted Rock
Pacific Gas and Electric Company
San Diego Gas and Electric Company, unless amended
Silicon Valley Leadership Group
Southern California Gas Company, unless amended
TechCA
TechNet
Western States Petroleum Association, unless amended
ARGUMENTS IN SUPPORT: According to the Author:
As California experiences a spike in the rollout of hyperscale data centers, SB 978 provides necessary and critical community public health and ratepayer cost shift protections. The rollout of these hyperscale data centers presents several challenges stemming from operational pressures that also intersect with broader economic and public health issues. Data centers pose a risk to ratepayers if left unchecked. Their projected electricity demand will require the construction of new transmission infrastructure, and without clear statutory guidance, those costs may be passed on to ratepayers already facing skyrocketing utility costs, as well as other commercial energy consumers. Beyond cost impacts, data centers also create public health concerns due to air pollution from backup diesel generator use. I have also heard community concerns following the Eaton Fire from my district that development pressures from data centers could extend into disaster-impacted communities where they do not align with recovery priorities or local community needs. SB 978 underscored California’s position: data centers will only proceed when communities have real oversight, environmental impacts are fully vetted, and fiscal accountability is guaranteed. Specifically, SB 978 addresses these challenges by establishing clear, targeted requirements to protect ratepayers, safeguard public health, and ensure alignment with California’s climate and workforce goals.
ARGUMENTS IN OPPOSITION: A coalition of technology and business organizations, including the Data Center Coalition, opposes this bill, arguing that it is unnecessary, limits economic growth, and includes technically infeasible provisions. In opposition, these groups state:
We believe the CPUC, in its regulatory role, is most appropriately suited to ensure appropriate cost allocation through public proceedings that are evidence-based, transparent, carefully considered, and open to stakeholder participation. California's position as a global technology leader depends on the vital infrastructure provided by data centers and underscores the need for careful consideration of proposed legislation that could impact this critical industry. We strongly urge the Committee to resist advancing SB 978.
-- END --
Discussed in Hearing
Senate Standing Committee on Labor, Public Employment and Retirement
Senate Standing Committee on Energy, Utilities and Communications
Bill Author
Bill Co-Author(s):