SB 887: Natural gas storage wells.
- Session Year: 2015-2016
- House: Senate
- Latest Version Date: 2016-09-26
(1)Under existing law, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation regulates the drilling, operation, maintenance, and abandonment of oil and gas wells in the state. Existing law provides that a person who fails to comply with specific laws relating to the regulation of oil or gas operations is guilty of a misdemeanor.
This bill would require the operator of a gas storage well, before January 1, 2018, to have commenced a mechanical integrity testing regime specified by the division and would require the division to promulgate regulations that establish standards for all gas storage wells, as specified. This bill would require the division to determine by regulation what constitutes a reportable leak from a gas storage well and the timeframe for reporting those leaks, as specified. Until the regulations are in effect, this bill would require the operator to notify the division immediately of a leak of any size from a gas storage well. This bill would require the division to post information about a reported leak that cannot be controlled within 48 hours on its Internet Web site, as prescribed. This bill would require the State Oil and Gas Supervisor, within 72 hours of being notified of a reportable leak, to determine if a relief well is necessary. If the supervisor makes that determination, whether within the first 72 hours or after, the bill would require the operator to immediately begin preparation for, and, as soon as practicable at the determination of the supervisor, commence the drilling of, a relief well. This bill would require an operator of a gas storage well to develop and maintain a comprehensive gas storage well training and mentoring program for those employees whose job duties involve the safety of operations and maintenance of gas storage wells and associated equipment, as specified. This bill would require certain materials, relating to wells serving or located in a natural gas storage facility, including, among others, a risk management plan, to be submitted by the operator and approved at the supervisors discretion. This bill would require the division to perform unannounced random onsite inspections of some gas storage wells annually. This bill would require the State Air Resources Board, in consultation with any local air district and the division, to develop guidelines for a monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks and the presence of natural gas emissions in the atmosphere. The bill would require an operator of a natural gas storage facility to develop and submit to the state board a facility monitoring plan that satisfies the program requirements, and would require the state board to review the plan and to either approve or disapprove the plan. This bill would require an operator of a natural gas storage facility to provide the monitoring data to the state board. This bill would require the state board or the division, as applicable, to post and make available on its respective Internet Web site all materials that are provided to the state board or division, as applicable, in order to comply with the provisions added by this act. Because a violation of these requirements would be a crime, the bill would impose a state-mandated local program.
(2)Existing law requires the operator of a well to file a written notice of intention to commence drilling with, and prohibits any drilling until approval is given by, the State Oil and Gas Supervisor or district deputy. Under existing law, the notice is deemed approved if the supervisor or district deputy fails to respond to the notice in writing within 10 working days from receipt and is deemed canceled if operations have not commenced within one year of receipt. Existing law provides that these provisions also apply to the deepening or redrilling of the well, any operation involving the plugging of the well, or any operations permanently altering in any manner the casing of the well.
This bill would require the division, on a weekly basis, to post on its Internet Web site a list of the notices of intention received by the division, and to provide copies of those notices to the public upon request.
(3)Under existing law, the State Oil and Gas Supervisor is required to impose an annual charge computed at a uniform rate based on the number of wells used to inject and withdraw gas from an underground storage facility during the preceding calendar year. Existing law requires the charge to defray the costs incurred by the state in maintaining surveillance over those facilities.
This bill would instead require that annual charge to be the proportionate share of the total regulatory costs projected for each fiscal year based on the field capacity and number of wells of each underground gas storage facility, as specified. The bill would require an additional charge to be imposed on an operator, if an uncontrolled leak or release of gas occurs at the operators underground gas storage facility, to defray the costs of the response effort of the division, as specified.
(4)The Administrative Procedure Act governs the procedure for the adoption, amendment, or repeal of regulations by state agencies and for the review of those regulatory actions by the Office of Administrative Law. Existing law provides that, if a state agency makes a finding that the adoption of a regulation or order of repeal is necessary for the immediate preservation of the public peace, health and safety, or general welfare, the regulation or order of repeal may be adopted as an emergency regulation or order of repeal. Under existing law, a regulation, amendment, or order of repeal adopted as an emergency regulation remains in effect no more than 180 days unless the adopting agency and the Office of Administrative Law comply with certain requirements.
Until January 1, 2019, this bill would instead require that emergency regulations adopted by the division effective February 5, 2016, continue in effect until the adoption, amendment, or repeal of the regulation is promulgated by the division pursuant to the act.
(5)Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including gas corporations. The Public Utilities Act prohibits any gas corporation from beginning the construction of, among other things, a line, plant, or system, or of any extension thereof, without having first obtained from the commission a certificate that the present or future public convenience and necessity require or will require that construction.
This bill, if a new underground gas storage facility is proposed, would require the commission to ensure that a risk assessment evaluating the potential impact of a leak from the facility on public and environmental health, safety, and welfare is conducted by the project proponent, as specified. This bill would require that the findings of any risk assessment conducted pursuant to these provisions be subjected to peer review by independent experts and reported to the Legislature, as specified.
(6)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)Under existing law, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation regulates the drilling, operation, maintenance, and abandonment of oil and gas wells in the state. Existing law provides that a person who fails to comply with specific laws relating to the regulation of oil or gas operations is guilty of a misdemeanor.
This bill would require the operator of a gas storage well, before January 1, 2018, to have commenced a mechanical integrity testing regime specified by the division and would require the division to promulgate regulations that establish standards for all gas storage wells, as specified. This bill would require the division to determine by regulation what constitutes a reportable leak from a gas storage well and the timeframe for reporting those leaks, as specified. Until the regulations are in effect, this bill would require the operator to notify the division immediately of a leak of any size from a gas storage well. This bill would require the division to post information about a reported leak that cannot be controlled within 48 hours on its Internet Web site, as prescribed. This bill would require the State Oil and Gas Supervisor, within 72 hours of being notified of a reportable leak, to determine if a relief well is necessary. If the supervisor makes that determination, whether within the first 72 hours or after, the bill would require the operator to immediately begin preparation for, and, as soon as practicable at the determination of the supervisor, commence the drilling of, a relief well. This bill would require an operator of a gas storage well to develop and maintain a comprehensive gas storage well training and mentoring program for those employees whose job duties involve the safety of operations and maintenance of gas storage wells and associated equipment, as specified. This bill would require certain materials, relating to wells serving or located in a natural gas storage facility, including, among others, a risk management plan, to be submitted by the operator and approved at the supervisors discretion. This bill would require the division to perform unannounced random onsite inspections of some gas storage wells annually. This bill would require the State Air Resources Board, in consultation with any local air district and the division, to develop guidelines for a monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks and the presence of natural gas emissions in the atmosphere. The bill would require an operator of a natural gas storage facility to develop and submit to the state board a facility monitoring plan that satisfies the program requirements, and would require the state board to review the plan and to either approve or disapprove the plan. This bill would require an operator of a natural gas storage facility to provide the monitoring data to the state board. This bill would require the state board or the division, as applicable, to post and make available on its respective Internet Web site all materials that are provided to the state board or division, as applicable, in order to comply with the provisions added by this act. Because a violation of these requirements would be a crime, the bill would impose a state-mandated local program.
(2)Existing law requires the operator of a well to file a written notice of intention to commence drilling with, and prohibits any drilling until approval is given by, the State Oil and Gas Supervisor or district deputy. Under existing law, the notice is deemed approved if the supervisor or district deputy fails to respond to the notice in writing within 10 working days from receipt and is deemed canceled if operations have not commenced within one year of receipt. Existing law provides that these provisions also apply to the deepening or redrilling of the well, any operation involving the plugging of the well, or any operations permanently altering in any manner the casing of the well.
This bill would require the division, on a weekly basis, to post on its Internet Web site a list of the notices of intention received by the division, and to provide copies of those notices to the public upon request.
(3)Under existing law, the State Oil and Gas Supervisor is required to impose an annual charge computed at a uniform rate based on the number of wells used to inject and withdraw gas from an underground storage facility during the preceding calendar year. Existing law requires the charge to defray the costs incurred by the state in maintaining surveillance over those facilities.
This bill would instead require that annual charge to be the proportionate share of the total regulatory costs projected for each fiscal year based on the field capacity and number of wells of each underground gas storage facility, as specified. The bill would require an additional charge to be imposed on an operator, if an uncontrolled leak or release of gas occurs at the operators underground gas storage facility, to defray the costs of the response effort of the division, as specified.
(4)The Administrative Procedure Act governs the procedure for the adoption, amendment, or repeal of regulations by state agencies and for the review of those regulatory actions by the Office of Administrative Law. Existing law provides that, if a state agency makes a finding that the adoption of a regulation or order of repeal is necessary for the immediate preservation of the public peace, health and safety, or general welfare, the regulation or order of repeal may be adopted as an emergency regulation or order of repeal. Under existing law, a regulation, amendment, or order of repeal adopted as an emergency regulation remains in effect no more than 180 days unless the adopting agency and the Office of Administrative Law comply with certain requirements.
Until January 1, 2019, this bill would instead require that emergency regulations adopted by the division effective February 5, 2016, continue in effect until the adoption, amendment, or repeal of the regulation is promulgated by the division pursuant to the act.
(5)Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including gas corporations. The Public Utilities Act prohibits any gas corporation from beginning the construction of, among other things, a line, plant, or system, or of any extension thereof, without having first obtained from the commission a certificate that the present or future public convenience and necessity require or will require that construction.
This bill, if a new underground gas storage facility is proposed, would require the commission to ensure that a risk assessment evaluating the potential impact of a leak from the facility on public and environmental health, safety, and welfare is conducted by the project proponent, as specified. This bill would require that the findings of any risk assessment conducted pursuant to these provisions be subjected to peer review by independent experts and reported to the Legislature, as specified.
(6)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)Under existing law, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation regulates the drilling, operation, maintenance, and abandonment of oil and gas wells in the state. Existing law provides that a person who fails to comply with specific laws relating to the regulation of oil or gas operations is guilty of a misdemeanor.
This bill would require the operator of a gas storage well, before January 1, 2018, to have commenced a mechanical integrity testing regime specified by the division and would require the division to promulgate regulations that establish standards for all gas storage wells, as specified. This bill would require the division to determine by regulation what constitutes a reportable leak from a gas storage well and the timeframe for reporting those leaks, as specified. Until the regulations are in effect, this bill would require the operator to notify the division immediately of a leak of any size from a gas storage well. This bill would require the division to post information about a reported leak that cannot be controlled within 48 hours on its Internet Web site, as prescribed. This bill would require the supervisor, within 72 hours of being notified of a reportable leak, to determine if a relief well is necessary. If the supervisor makes that determination, whether within the first 72 hours or after, the bill would require the operator to immediately begin preparation for, and and, as soon as practicable at the determination of the supervisor, commence the drilling of, a relief well. This bill would require an operator of a gas storage well to develop and maintain a comprehensive gas storage well training and mentoring program for those employees whose job duties involve the safety of operations and maintenance of gas storage wells and associated equipment, as specified. This bill would require certain materials, relating to wells serving or located in a natural gas storage facility, including, among others, a site-specific risk management plan, to be submitted by the operator and approved at the supervisors discretion. This bill would require the division to perform unannounced random onsite inspections of some gas storage wells annually. This bill would require the State Air Resources Board, in consultation with any local air district and the division, to develop guidelines for a monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks and the presence of natural gas emissions in the atmosphere. The bill would require an operator of a natural gas storage facility to develop and submit to the state board a facility monitoring plan that satisfies the program requirements, and would require the state board to review the plan and to either approve or disapprove the plan. This bill would require an operator of a natural gas storage facility to provide the monitoring data to the state board. This bill would require the state board or the division, as applicable, to post and make available on its respective Internet Web site all materials that are provided to the state board or division, as applicable, in order to comply with the provisions added by this act. Because a violation of these requirements would be a crime, the bill would impose a state-mandated local program.
(2)Existing law requires the operator of a well to file a written notice of intention to commence drilling with, and prohibits any drilling until approval is given by, the supervisor or district deputy. Under existing law, the notice is deemed approved if the supervisor or district deputy fails to respond to the notice in writing within 10 working days from receipt and is deemed canceled if operations have not commenced within one year of receipt. Existing law provides that these provisions also apply to the deepening or redrilling of the well, any operation involving the plugging of the well, or any operations permanently altering in any manner the casing of the well.
This bill would require the division, on a weekly basis, to post on its Internet Web site a list of the notices of intention received by the division, and to provide copies of those notices to the public upon request.
(3)Under existing law, the supervisor is required to impose an annual charge computed at a uniform rate based on the number of wells used to inject and withdraw gas from an underground storage facility during the preceding calendar year. Existing law requires the charge to defray the costs incurred by the state in maintaining surveillance over those facilities.
This bill would instead require that annual charge to be the proportionate share of the total regulatory costs projected for each fiscal year based on the field capacity and number of wells of each underground gas storage facility. facility, as specified. The bill would require an additional charge to be imposed on an operator, if an uncontrolled leak or release of gas occurs at the operators underground gas storage facility, to defray the costs of the response effort of the division, as specified.
(4)The Administrative Procedure Act governs the procedure for the adoption, amendment, or repeal of regulations by state agencies and for the review of those regulatory actions by the Office of Administrative Law. Existing law provides that, if a state agency makes a finding that the adoption of a regulation or order of repeal is necessary for the immediate preservation of the public peace, health and safety, or general welfare, the regulation or order of repeal may be adopted as an emergency regulation or order of repeal. Under existing law, a regulation, amendment, or order of repeal adopted as an emergency regulation remains in effect no more than 180 days unless the adopting agency and the Office of Administrative Law comply with certain requirements.
Until January 1, 2019, this bill would instead require that emergency regulations adopted by the division effective February 5, 2016, continue in effect until the adoption, amendment, or repeal of the regulation is promulgated by the division pursuant to the act.
(5)Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including gas corporations. The Public Utilities Act prohibits any gas corporation from beginning the construction of, among other things, a line, plant, or system, or of any extension thereof, without having first obtained from the commission a certificate that the present or future public convenience and necessity require or will require that construction.
This bill, if a new underground gas storage facility is proposed, would require the commission to ensure that a risk assessment evaluating the potential impact of a leak from the facility on public and environmental health, safety, and welfare is conducted by the project proponent, as specified. This bill would require that the findings of any risk assessment conducted pursuant to these provisions be subjected to peer review by independent experts and reported to the Legislature, as specified.
(6)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under
(1)Under existing law, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation regulates the drilling, operation, maintenance, and abandonment of oil and gas wells in the state. Existing law provides that a person who fails to comply with specific laws relating to the regulation of oil or gas operations is guilty of a misdemeanor.
This bill would require the operator of a natural gas storage well, before January 1, 2018, and annually thereafter, to be tested across its entire length for a loss of integrity resulting in a leak and to have those results reported to the division, and would prescribe standards for a natural gas storage well, including among other things, required baseline and follow-on proactive evaluations. This bill would require, on or before July 1, 2018, all natural gas storage wells, except low-risk natural gas storage wells, as defined, to be equipped with an automatic downhole shutoff system and to conduct natural gas injection and production through tubing only and be isolated from contact with the well casing. The bill would require low-risk natural gas storage wells to comply with those requirements on or before July 1, 2019, except as provided. This bill would require all newly constructed natural gas storage wells to have a cement barrier, as determined by the supervisor. This bill would require, in the event of a loss of the integrity of a natural gas storage well, well casing, or cementing resulting in a large ongoing leak of natural gas and associated gases and materials that pose a significant present or potential hazard to public health and safety, property, or to the environment, that preparations for the drilling of a relief well begin within 24 hours of the discovery of the leak. This to have commenced a mechanical integrity testing regime specified by the division and would require the division to promulgate regulations that establish standards for all gas storage wells, as specified. This bill would require the division to determine by regulation what constitutes a reportable leak from a gas storage well and the timeframe for reporting those leaks, as specified. Until the regulations are in effect, this bill would require the operator, in the event of operator to notify the division immediately of a leak of any size from a natural gas storage well, to notify the division immediately and well. This bill would require the division to post information about the a reported leak that cannot be controlled within 48 hours on its Internet Web site, as prescribed. This bill would require the supervisor, within 72 hours of being notified of a reportable leak, to determine if a relief well is necessary. If the supervisor makes that determination, whether within the first 72 hours or after, the bill would require the operator to immediately begin preparation for, and commence the drilling of, a relief well. This bill would require an operator of a natural gas storage well to develop and maintain a comprehensive gas storage well training and mentoring program for those employees whose job duties involve the safety of operations and maintenance of natural gas storage wells and associated equipment, as specified. This bill would require the division to convene an independent panel of recognized experts to develop best practices for natural gas storage facilities and to review and incorporate the best practices developed by the panel into its regulations for natural gas storage wells, if appropriate, and to the extent those practices are applicable, for other wells under the divisions jurisdiction. The bill would require the division to periodically, and whenever necessary, review advances in relevant technologies and best practices for natural gas storage facilities and, if appropriate, to incorporate changes in best practices into its regulations for natural gas storage wells and, to the extent those practices are applicable, for other wells under the divisions jurisdiction. This bill would require certain materials, relating to wells serving or located in a natural gas storage facility, including, among others, a site-specific risk management plan, to be submitted by the operator and approved at the supervisors discretion. This bill would require the division to, as feasible, incorporate federal regulations applicable to natural gas storage facilities, including, into the divisions gas storage well regulations, and to perform unannounced random onsite inspections of some natural gas storage wells annually. This bill would require the Office of Environmental Health Hazard Assessment and the State Department of Public Health, in consultation with the division, to perform a risk assessment of natural gas storage wells to determine, among other things, appropriate setback distances for natural gas storage wells and to report the findings of the risk assessment to the Legislature. This bill would require the State Air Resources Board, in consultation with any local air district and the division, to develop guidelines for a monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks and the presence of natural gas emissions in the atmosphere. The bill would require an operator of a natural gas storage facility to develop and submit to the state board a facility monitoring plan that satisfies the program requirements, and would require the state board to review the plan and to either approve or disapprove the plan. This bill would require an operator of a natural gas storage facility to provide the monitoring data to be provided to the state board. This bill would require the division state board or the division, as applicable, to post and make available on its respective Internet Web site all materials that are provided to the state board or division division, as applicable, in order to comply with the provisions added by this act. Because a violation of these requirements would be a crime, the bill would impose a state-mandated local program.
Existing
(2)Existing law requires the operator of a well to file a written notice of intention to commence drilling with, and prohibits any drilling until approval is given by, the supervisor or district deputy. Under existing law, the notice is deemed approved if the supervisor or district deputy fails to respond to the notice in writing within 10 working days from receipt and is deemed canceled if operations have not commenced within one year of receipt. Existing law provides that these provisions also apply to the deepening or redrilling of the well, any operation involving the plugging of the well, or any operations permanently altering in any manner the casing of the well.
This bill would require certain materials, relating to wells serving or located in a natural gas storage facility, to be submitted by the operator and approved at the supervisors discretion before approval of the notice. This bill would provide that the public has a right to review the locations of all new natural gas storage wells or existing wells converting to natural gas storage wells before the approval of the notice. the division, on a weekly basis, to post on its Internet Web site a list of the notices of intention received by the division, and to provide copies of those notices to the public upon request.
Existing law requires the owner or operator of any well to keep, or cause to be kept, a careful and accurate log, core record, and history of the drilling of the well.
This bill would require the well history to include all operations, injection, production, and emplacement of any materials into a natural gas storage well, and to be disclosed to the division by the operator, as specified.
Under existing law, a person who violates certain statutes or regulations relating to oil and gas well operations is subject to a civil penalty not to exceed $25,000 for each violation. Existing law provides that the unreasonable waste of natural gas by act, omission, sufferance, or insistence is opposed to the public interest and is unlawful.
This bill would provide that a violation of the prohibition against the unreasonable waste of natural gas is subject to the civil penalty not to exceed $25,000 for each violation.
(3)Under existing law, the supervisor is required to impose an annual charge computed at a uniform rate based on the number of wells used to inject and withdraw gas from an underground storage facility during the preceding calendar year. Existing law requires the charge to defray the costs incurred by the state in maintaining surveillance over those facilities.
This bill would instead require that annual charge to be the proportionate share of the total regulatory costs projected for each fiscal year based on the field capacity and number of wells of each underground gas storage facility. The bill would require an additional charge to be imposed on an operator, if an uncontrolled leak or release of gas occurs at the operators underground gas storage facility, to defray the costs of the response effort of the division, as specified.
(4)The Administrative Procedure Act governs the procedure for the adoption, amendment, or repeal of regulations by state agencies and for the review of those regulatory actions by the Office of Administrative Law. Existing law provides that, if a state agency makes a finding that the adoption of a regulation or order of repeal is necessary for the immediate preservation of the public peace, health and safety, or general welfare, the regulation or order of repeal may be adopted as an emergency regulation or order of repeal. Under existing law, a regulation, amendment, or order of repeal adopted as an emergency regulation remains in effect no more than 180 days unless the adopting agency and the Office of Administrative Law comply with certain requirements.
Until January 1, 2019, this bill would instead require that emergency regulations adopted by the division effective February 5, 2016, continue in effect until the adoption, amendment, or repeal of the regulation is promulgated by the division pursuant to the act.
(5)Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including gas corporations. The Public Utilities Act prohibits any gas corporation from beginning the construction of, among other things, a line, plant, or system, or of any extension thereof, without having first obtained from the commission a certificate that the present or future public convenience and necessity require or will require that construction.
This bill, if a new underground gas storage facility is proposed, would require the commission to ensure that a risk assessment evaluating the potential impact of a leak from the facility on public and environmental health, safety, and welfare is conducted by the project proponent, as specified. This bill would require that the findings of any risk assessment conducted pursuant to these provisions be subjected to peer review by independent experts and reported to the Legislature, as specified.
The
(6)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation regulates the drilling, operation, maintenance, and abandonment of oil and gas wells in the state. Existing law provides that a person who fails to comply with specific laws relating to the regulation of oil or gas operations is guilty of a misdemeanor.
This bill would require a natural gas storage well, before January 1, 2018, and annually thereafter, to be tested across its entire length for a loss of integrity resulting in a leak and to have those results reported to the division, and would prescribe standards for a natural gas storage well, including among other things, a requirement that the well be equipped with an automatic downhole shutoff system and required baseline and follow-on proactive evaluations. This bill would require, on or before July 1, 2018, all natural gas storage wells, except low-risk natural gas storage wells, as defined, to be equipped with an automatic downhole shutoff system and to conduct natural gas injection and production through tubing only and be isolated from contact with the well casing. The bill would require low-risk natural gas storage wells to comply with those requirements on or before July 1, 2019, except as provided. This bill would require all newly constructed natural gas storage wells to have a cement barrier, as determined by the supervisor. This bill would require, in the event of a loss of the integrity of a natural gas storage well, well casing, or cementing resulting in a large ongoing leak of natural gas and associated gases and materials that pose a significant present or potential hazard to public health and safety, property, or to the environment, that preparations for the drilling of a relief well begin within 24 hours of the discovery of the leak. This bill would require the operator, in the event of a leak of any size from a natural gas storage well, to notify the division immediately and would require the division to post information about the leak on its Internet Web site, as prescribed. This bill would require an operator of a natural gas storage well to develop and maintain a comprehensive gas storage well training and mentoring program for those employees whose job duties involve the safety of operations and maintenance of natural gas storage wells and associated equipment, as specified. This bill would require the division to convene an independent panel of recognized experts to develop best practices for natural gas storage facilities and to review and incorporate the best practices developed by the panel into its regulations for natural gas storage wells, if appropriate, and to the extent those practices are applicable, for other wells under the divisions jurisdiction. The bill would require the division to periodically, and whenever necessary, review advances in relevant technologies and best practices for natural gas storage facilities and, if appropriate, to incorporate changes in best practices into its regulations for natural gas storage wells and, to the extent those practices are applicable, for other wells under the divisions jurisdiction. This bill would require the division to, as feasible, incorporate federal regulations applicable to natural gas storage facilities, including, into the divisions gas storage well regulations, and to perform unannounced random on-site onsite inspections of some natural gas storage wells annually. This bill would require the Office of Environmental Health Hazard Assessment and the State Department of Public Health, in consultation with the division, to perform a risk assessment of natural gas storage wells to determine determine, among other things, appropriate setback distances for natural gas storage wells and to report the findings of the risk assessment to the Legislature. This bill would require the State Air Resources Board, in consultation with any local air district and the division, to develop guidelines for a monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks and the presence of natural gas emissions in the atmosphere. The bill would require an operator of a natural gas storage facility to develop and submit to the state board a facility monitoring plan that satisfies the program requirements, and would require the state board to review the plan and to either approve or disapprove the plan. This bill would require monitoring data to be provided to the state board. This bill would require the division to post and make available on its Internet Web site all materials that are provided to the state board or division in order to comply with the provisions added by this act. Because a violation of these requirements would be a crime, the bill would impose a state-mandated local program.
Existing law requires the operator of a well to file a written notice of intention to commence drilling with, and prohibits any drilling until approval is given by, the supervisor or district deputy. Under existing law, the notice is deemed approved if the supervisor or district deputy fails to respond to the notice in writing within 10 working days from receipt and is deemed canceled if operations have not commenced within one year of receipt. Existing law provides that these provisions also apply to the deepening or redrilling of the well, any operation involving the plugging of the well, or any operations permanently altering in any manner the casing of the well.
This bill would require certain materials, relating to wells serving or located in a natural gas storage facility, to be submitted by the operator and approved at the supervisors discretion before approval of the notice. This bill would provide that the public has a right to review the locations of all new natural gas storage wells or existing wells converting to natural gas storage wells before the approval of the notice.
Existing law requires the owner or operator of any well to keep, or cause to be kept, a careful and accurate log, core record, and history of the drilling of the well.
This bill would require the well history to include all operations, injection, production, and emplacement of any materials into a natural gas storage well, and to be disclosed to the division by the operator, as specified.
Under existing law, a person who violates certain statutes or regulations relating to oil and gas well operations is subject to a civil penalty not to exceed $25,000 for each violation. Existing law provides that the unreasonable waste of natural gas by act, omission, sufferance, or insistence is opposed to the public interest and is unlawful.
This bill would provide that a violation of the prohibition against the unreasonable waste of natural gas is subject to the civil penalty not to exceed $25,000 for each violation.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation regulates the drilling, operation, maintenance, and abandonment of oil and gas wells in the state. Existing law provides that a person who fails to comply with specific laws relating to the regulation of oil or gas operations is guilty of a misdemeanor.
This bill would require the division, require a natural gas storage well, before January 1, 2018, and annually thereafter, to inspect all natural gas storage wells serving or located in a natural gas storage facility be tested across its entire length for a loss of integrity resulting in a leak and to have those results reported to the division, and would prescribe standards for a natural gas storage well. This bill would require a natural gas storage well in existence on December 31, 2016, to be brought into compliance with the provisions of this bill by an unspecified date and the use of wells older than an unspecified age to be phased out by an unspecified date. This bill would prohibit the division from issuing a permit for a new natural gas storage well located within an unspecified distance of a sensitive receptor, as defined, and would require the division to order operators to cease the use of, and plug and abandon, an existing natural gas storage well that is within an unspecified distance of a sensitive receptor by an unspecified date. well, including among other things, a requirement that the well be equipped with an automatic downhole shutoff system and required baseline and follow-on proactive evaluations. This bill would require, in the event of a loss of the integrity of a natural gas storage well, well casing, or cementing resulting in a significant, uncontrolled large ongoing leak of natural gas, gas and associated gases and materials that pose a significant present or potential hazard to public health and safety, property, or to the environment, that preparations for the drilling of a relief well begin within 24 hours of the discovery of the leak. This bill would require the operator, in the event of a leak of any size from a natural gas storage well, to notify the division immediately and would require the division to post information about the leak on its Internet Web site, as prescribed. This bill would require an operator of a natural gas storage well to develop and maintain a comprehensive gas storage well training and mentoring program for those employees whose job duties involve the safety of operations and maintenance of natural gas storage wells and associated equipment, as specified. This bill would require the division to convene an independent panel of recognized experts to develop best practices for natural gas storage facilities and to review and incorporate the best practices developed by the panel into its regulations for natural gas storage wells, if appropriate, and to the extent those practices are applicable, for other wells under the divisions jurisdiction. The bill would require the division to periodically, and whenever necessary, review advances in relevant technologies and best practices for natural gas storage facilities and, if appropriate, to incorporate changes in best practices into its regulations for natural gas storage wells and, to the extent those practices are applicable, for other wells under the divisions jurisdiction. This bill would require the division to, as feasible, incorporate federal regulations applicable to natural gas storage facilities, including, into the divisions gas storage well regulations, and to perform unannounced random on-site inspections of some natural gas storage wells annually. This bill would require the division, in consultation with the Office of Environmental Health Hazard Assessment, Assessment and the State Department of Public Health, and the Department of Industrial Relations, in consultation with the division, to perform a risk assessment of natural gas storage wells to determine appropriate setback distances for natural gas storage wells and to report the findings of the risk assessment to the Legislature. This bill would require the State Air Resources Board, in consultation with any local air district and the division, to develop guidelines for a monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks and the presence of natural gas emissions in the atmosphere. The bill would require an operator of a natural gas storage facility to develop and submit to the board a facility monitoring plan that satisfies the program requirements, and would require the board to review the plan and to either approve or disapprove the plan. This bill would require monitoring data to be provided to the board. This bill would require the division to post and make available on its Internet Web site all materials that are provided to the board or division in order to comply with the provisions added by this act. Because a violation of these requirements would be a crime, the bill would impose a state-mandated local program.
Existing law requires the operator of a well to file a written notice of intention to commence drilling with, and prohibits any drilling until approval is given by, the supervisor or district deputy. Under existing law, the notice is deemed approved if the supervisor or district deputy fails to respond to the notice in writing within 10 working days from receipt and is deemed canceled if operations have not commenced within one year of receipt. Existing law provides that these provisions also apply to the deepening or redrilling of the well, any operation involving the plugging of the well, or any operations permanently altering in any manner the casing of the well.
This bill would require certain materials, relating to wells serving or located in a natural gas storage facility, to be submitted by the operator and approved at the supervisors discretion before approval of the notice. This bill would provide that the public has a right to review the locations of all new natural gas storage wells or existing wells converting to natural gas storage wells before the approval of the notice.
Existing law requires the owner or operator of any well to keep, or cause to be kept, a careful and accurate log, core record, and history of the drilling of the well.
This bill would require the well history to include all operations, injection, production, and emplacement of any materials into a natural gas storage well, and to be disclosed to the division by the operator, as specified.
Under existing law, a person who violates certain statutes or regulations relating to oil and gas well operations is subject to a civil penalty not to exceed $25,000 for each violation. Existing law provides that the unreasonable waste of natural gas by act, omission, sufferance, or insistence is opposed to the public interest and is unlawful.
This bill would provide that a violation of the prohibition against the unreasonable waste of natural gas is subject to the civil penalty not to exceed $25,000 for each violation.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation regulates the drilling, operation, maintenance, and abandonment of oil and gas wells in the state. Existing law provides that a person who fails to comply with specific laws relating to the regulation of oil or gas operations is guilty of a misdemeanor.
This bill would require the division, before January 1, 2018, and annually thereafter, to inspect all natural gas storage wells serving or located in a natural gas storage facility and would prescribe standards for a natural gas storage well. This bill would require a natural gas storage well in existence on December 31, 2016, to be brought into compliance with the provisions of this bill by an unspecified date and the use of wells older than an unspecified age to be phased out by an unspecified date. This bill would prohibit the division from issuing a permit for a new natural gas storage well located within an unspecified distance of a sensitive receptor, as defined, and would require the division to order operators to cease the use of, and plug and abandon, an existing natural gas storage well that is within an unspecified distance of a sensitive receptor by an unspecified date. This bill would require, in the event of a loss of the integrity of a natural gas storage well, well casing, or cementing resulting in a significant, uncontrolled leak of natural gas, that preparations for the drilling of a relief well begin within 24 hours of the discovery of the leak. This bill would require the operator, in the event of a leak of any size from a natural gas storage well, to notify the division immediately and would require the division to post information about the leak on its Internet Web site, as prescribed. This bill would require the division to convene an independent panel of recognized experts to develop best practices for natural gas storage facilities and to review and incorporate the best practices developed by the panel into its regulations for natural gas storage wells, as if appropriate, and to the extent those practices are applicable, for other wells under the divisions jurisdiction, as applicable. jurisdiction. The bill would require the division to periodically, and whenever necessary, review advances in relevant technologies and best practices for natural gas storage facilities and, if appropriate, to incorporate changes in best practices into its regulations for natural gas storage wells and, to the extent those practices are applicable, for other wells under the divisions jurisdiction. This bill would require the division, in consultation with the Office of Environmental Health Hazard Assessment, the State Department of Public Health, and the Department of Industrial Relations, to perform a risk assessment of natural gas storage wells and to report the findings of the risk assessment to the Legislature. This bill would require the State Air Resources Board, in consultation with any local air district and the division, to develop guidelines for a monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks and the presence of natural gas emissions in the atmosphere. The bill would require an operator of a natural gas storage facility to develop and submit to the board a facility monitoring plan that satisfies the program requirements, and would require the board to review the plan and to either approve or disapprove the plan. This bill would require monitoring data to be provided to the board. This bill would require the division to post and make available on its Internet Website Web site all materials that are provided to the board or division in order to comply with the provisions added by this act. Because a violation of these requirements would be a crime, the bill would impose a state-mandated local program.
Existing law requires the operator of a well to file a written notice of intention to commence drilling with, and prohibits any drilling until approval is given by, the supervisor or district deputy. Under existing law, the notice is deemed approved if the supervisor or district deputy fails to respond to the notice in writing within 10 working days from receipt and is deemed canceled if operations have not commenced within one year of receipt. Existing law provides that these provisions also apply to the deepening or redrilling of the well, any operation involving the plugging of the well, or any operations permanently altering in any manner the casing of the well.
This bill would require certain materials, relating to wells serving or located in a natural gas storage facility, to be submitted by the operator and approved at the supervisors discretion before approval of the notice. This bill would provide that the public has a right to review the locations of all new natural gas storage wells or existing wells converting to natural gas storage wells before the approval of the notice.
Existing law requires the owner or operator of any well to keep, or cause to be kept, a careful and accurate log, core record, and history of the drilling of the well.
This bill would require the well history to include all operations, injection, production, and emplacement of any materials into a natural gas storage well, and to be disclosed to the division by the operator, as specified.
Under existing law, a person who violates certain statutes or regulations relating to oil and gas well operations is subject to a civil penalty not to exceed $25,000 for each violation. Existing law provides that the unreasonable waste of natural gas by act, omission, sufferance, or insistence is opposed to the public interest and is unlawful.
This bill would provide that a violation of the prohibition against the unreasonable waste of natural gas is subject to the civil penalty not to exceed $25,000 for each violation.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation regulates the drilling, operation, maintenance, and abandonment of oil and gas wells in the state. Existing law provides that a person who fails to comply with specific laws relating to the regulation of oil or gas operations is guilty of a misdemeanor.
This bill would require, require the division, before January 1, 2018, and annually thereafter, the division to inspect all natural gas storage wells serving or located in a natural gas storage facility and would prescribe standards for a natural gas storage well. This bill would require a natural gas storage well in existence on December 31, 2016, to be brought into compliance with the provisions of this bill by an unspecified date and the use of wells older than an unspecified age to be phased out by an unspecified date. This bill would prohibit the division from issuing a permit for a new natural gas storage well located within an unspecified distance of a sensitive receptor, as defined, and would require the division to order operators to cease the use of, and plug and abandon, an existing natural gas storage well that is within an unspecified distance of a sensitive receptor by an unspecified date. This bill would require, in the event of a loss of the integrity of a natural gas storage well, well casing, or cementing resulting in a significant, uncontrolled leak of natural gas, that preparations for the drilling of a relief well begin within 24 hours of the discovery of the leak. This bill would require the operator, in the event of a leak of any size from a natural gas storage well, to notify the division immediately and would require the division to post information about the leak on its Internet Web site, as prescribed. This bill would require the division to convene an independent panel of recognized experts to develop best practices for natural gas storage facilities and to review and incorporate the best practices developed by the panel into its regulations for natural gas storage wells, as appropriate, and for other wells under the divisions jurisdiction, as applicable. This bill would require the division, in consultation with the Office of Environmental Health Hazard Assessment, the State Department of Public Health, and the Department of Industrial Relations, to perform a risk assessment of natural gas storage wells and to report the findings of the risk assessment to the Legislature. This bill would require the State Air Resources Board, in consultation with any local air district and the division, to develop guidelines for a monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks. leaks and the presence of natural gas emissions in the atmosphere. The bill would require an operator of a natural gas storage facility to develop and submit to the board a facility monitoring plan that satisfies the program requirements, and would require the board to review the plan and to either approve or disapprove the plan. This bill would require monitoring data to be provided to the board. This bill would require the division to post and make available on its Internet Website all materials that are provided to the board or division in order to comply with these the provisions to be posted and available to the public on its Internet Web site. added by this act. Because a violation of these requirements would be a crime, the bill would impose a state-mandated local program.
Existing law requires the operator of a well to file a written notice of intention to commence drilling with, and prohibits any drilling until approval is given by, the supervisor or district deputy. Under existing law, the notice is deemed approved if the supervisor or district deputy fails to respond to the notice in writing within 10 working days from receipt and is deemed canceled if operations have not commenced within one year of receipt. Existing law provides that these provisions also apply to the deepening or redrilling of the well, any operation involving the plugging of the well, or any operations permanently altering in any manner the casing of the well.
This bill would require certain materials, relating to wells serving or located in a natural gas storage facility, to be submitted by the operator and approved at the supervisors discretion before approval of the notice. This bill would provide that the public has a right to review the location locations of all new natural gas storage wells or existing wells converting to a natural gas storage well wells before the approval of the notice.
Existing law requires the owner or operator of any well to keep, or cause to be kept, a careful and accurate log, core record, and history of the drilling of the well.
This bill would require the well history to include all operations, injection, production, and emplacement of any materials into a natural gas storage well, and to be disclosed to the division by the operator, as specified.
Under existing law, a person who violates certain statutes or regulations relating to oil and gas well operations is subject to a civil penalty not to exceed $25,000 for each violation. Existing law provides that the unreasonable waste of natural gas by act, omission, sufferance, or insistence is opposed to the public interest and is unlawful.
This bill would provide that a violation of the prohibition against the unreasonable waste of natural gas is subject to the civil penalty not to exceed $25,000 for each violation.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation regulates the drilling, operation, maintenance, and abandonment of oil and gas wells in the state. Existing law provides that a person who fails to comply with specific laws relating to the regulation of oil or gas operations is guilty of a misdemeanor.
This bill would require, before January 1, 2018, and annually thereafter, the division to inspect all natural gas storage wells serving or located in a natural gas storage facility and would prescribe standards for a natural gas storage well. This bill would require a natural gas storage well in existence on December 31, 2016, to be brought into compliance with the provisions of this bill by an unspecified date and the use of wells older than an unspecified age to be phased out by an unspecified date. This bill would prohibit the division from issuing a permit for a new natural gas storage well located within an unspecified distance of a sensitive receptor, as defined, and would require the division to order operators to cease the use of, and plug and abandon, an existing natural gas storage well that is within an unspecified distance of a sensitive receptor by an unspecified date. This bill would require, in the event of a loss of the integrity of a natural gas storage well, well casing, or cementing resulting in a significant, uncontrolled leak of natural gas, that preparations for the drilling of a relief well begin within 24 hours of the discovery of the leak. This bill would require the operator, in the event of a leak of any size from a natural gas storage well, to notify the division immediately and would require the division to post information about the leak on its Internet Web site, as prescribed. This bill would require the division to convene an independent panel of recognized experts to develop best practices for natural gas storage facilities and to review and incorporate the best practices developed by the panel into its regulations for natural gas storage wells, as appropriate, and for other wells under the divisions jurisdiction, as applicable. This bill would require the division, in consultation with the Office of Environmental Health Hazard Assessment, the State Department of Public Health, and the Department of Industrial Relations, to perform a risk assessment of natural gas storage wells and to report the findings of the risk assessment to the Legislature. This bill would require the State Air Resources Board, in consultation with any local air district and the division, to develop guidelines for a monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks. This bill would require all materials provided to the division to comply with these provisions to be posted and available to the public on its Internet Web site. Because a violation of these requirements would be a crime, the bill would impose a state-mandated local program.
Existing law requires the operator of a well to file a written notice of intention to commence drilling with, and prohibits any drilling until approval is given by, the supervisor or district deputy. Under existing law, the notice is deemed approved if the supervisor or district deputy fails to respond to the notice in writing within 10 working days from receipt and is deemed canceled if operations have not commenced within one year of receipt. Existing law provides that these provisions also apply to the deepening or redrilling of the well, any operation involving the plugging of the well, or any operations permanently altering in any manner the casing of the well.
This bill would require certain materials, relating to wells serving or located in a natural gas storage facility, to be submitted by the operator and approved at the supervisors discretion before approval of the notice. This bill would provide that the public has a right to review the location of all new natural gas storage wells or existing wells converting to a natural gas storage well before the approval of the notice.
Existing law requires the owner or operator of any well to keep, or cause to be kept, a careful and accurate log, core record, and history of the drilling of the well.
This bill would require the well history to include all operations, injection, production, and emplacement of any materials into a natural gas storage well, and to be disclosed to the division by the operator, as specified.
Under existing law, a person who violates certain statutes or regulations relating to oil and gas well operations is subject to a civil penalty not to exceed $25,000 for each violation. Existing law provides that the unreasonable waste of natural gas by act, omission, sufferance, or insistence is opposed to the public interest and is unlawful.
This bill would provide that a violation of the prohibition against the unreasonable waste of natural gas is subject to the civil penalty not to exceed $25,000 for each violation.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The Legislature finds and declares as follows:
(a)Public transparency regarding risks, the regulations designed to mitigate those risks, and regulatory activity are essential to protect public health and welfare and natural resources.
(b)Public disclosure and safe operation of gas storage wells and associated piping and equipment are essential in order to provide for public, environmental, and occupational health and welfare, including a proactive approach to potential problems.
(c)On October 23, 2015, a significant, uncontrolled leak from a natural gas storage well that was originally drilled over 60 years ago was discovered in the Aliso Canyon natural gas storage facility located in the County of Los Angeles. Initial efforts to stop the leak failed.
(d)The Division of Oil, Gas, and Geothermal Resources in the Department of Conservation responded swiftly to the leak, including by issuing two orders that, among other things, require the use of relief wells. The division worked around the clock overseeing efforts to stop the leak.
(e)It was several days before the community was notified of the leak, although numerous residents started reporting odor concerns almost immediately. The leaking well is up the hill and approximately one and one-quarter miles away from the nearest home. Other natural gas storage wells serving this facility are located closer to homes and businesses.
(f)The operator of the leaking well had removed a subsurface safety valve decades earlier and had not replaced it. Regulations in effect at that time did not require approval or replacement of the valve. There was no automatic downhole shutoff system installed in the event of a leak. In 2014, the operator acknowledged publicly in a filing to the Public Utilities Commission that many of its wells needed additional assessment and repair. There was no requirement to disclose to potential homebuyers and business owners the existence of the Aliso Canyon natural gas storage facility and its attendant risks.
(g)The Governor declared a state of emergency on January 6, 2016, in order to facilitate the ongoing state response and efforts to stop the leak.
(h)On February 18, 2016, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation certified that the Aliso Canyon leak had been stopped. Reports estimate almost 100,000 metric tons of the potent greenhouse gas methane were emitted to the atmosphere. In addition to climate risks, community health concerns continue postleak with hundreds of complaints reported to the County of Los Angeles along with widespread concern about the short- and long-term impacts of the leak on public health and economic welfare in the area.
(i)The standards for natural gas storage wells need to be improved in order to reflect 21st century technology, disclose and mitigate any risks associated with those wells, recognize that these facilities may be in locations near population centers, and ensure a disaster like the Aliso Canyon leak does not happen again.
SEC. 2.Chapter 6 (commencing with Section 42710) is added to Part 4 of Division 26 of the Health and Safety Code, to read:6.Natural Gas Storage Facility Monitoring42710.(a)The state board, in consultation with any local air district and the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation, shall develop a natural gas storage facility monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks and the presence of natural gas emissions in the atmosphere. The continuous monitoring program may be supplemented by daily leak detection measurements.
(b)(1)The program shall include guidelines for the continuous monitoring which shall include, at minimum, optical gas imaging, where applicable, and accurate quantitative monitoring of natural gas concentrations. The program shall include protocols for both stationary and mobile monitoring, as well as fixed and temporary monitoring locations.
(2)The program shall require optical gas imaging when a large, ongoing leak occurs.
(c)An operator of a natural gas storage facility shall develop and submit to the state board a facility monitoring plan that satisfies program requirements pursuant to subdivisions (a) and (b). The state board shall review the plan and may approve or disapprove the plan.
(d)An operator of a natural gas storage facility shall conduct monitoring in accordance with the facility monitoring plan approved by the state board pursuant to subdivision (c).
(e)An operator of a natural gas storage facility shall provide monitoring data to the state board. All materials provided to comply with this section shall be posted and available to the public on the Internet Web site of the state board.
SEC. 3.Article 3.5 (commencing with Section 3180) is added to Chapter 1 of Division 3 of the Public Resources Code, to read:3.5.Natural Gas Storage Wells3180.(a)As used in this article, gas storage well means an active or idle well used primarily to inject natural gas into or withdraw natural gas from an underground natural gas storage facility.
(b)On or before January 1, 2018, the operators of all gas storage wells shall have commenced a mechanical integrity testing regime specified by the division. The testing regime shall include all of the following:
(1)Regular leak testing.
(2)Casing wall thickness inspection.
(3)Pressure test of the production casing.
(4)Any additional testing deemed necessary by the division to demonstrate the integrity of the well.
(c)All anomalies identified in the testing shall be immediately reported to the appropriate district office and explained to the supervisors satisfaction.
(d)(1)The division shall promulgate regulations that establish standards for the design, construction, and maintenance of all gas storage wells to ensure that integrity concerns with a gas storage well are identified and addressed before they can become a threat to life, health, property, the climate, or natural resources.
(2)The regulations shall require that gas storage wells be designed, constructed, and maintained to ensure that a single point of failure does not pose an immediate threat of loss of control of fluids, as determined by the supervisor.
(3)In developing the regulations, the division shall consider enhanced design, construction, and maintenance measures that could meet the standard in paragraph (2), including any of the following:
(A)Primary and secondary mechanical well barriers to isolate the storage gas within the storage reservoir and transfer storage gas from the surface into and out of the storage reservoir.
(B)Production casing to the surface with the required integrity to contain reservoir pressure.
(C)Tubing and packer and production tree with the required integrity to contain reservoir pressure.
(D)Surface controlled subsurface safety valves or Christmas tree valves with the required integrity to contain reservoir pressure that halt flow through the well.
(E)Secondary barrier with overlapping cement casing between two concentric casings with good quality cement bond.
(F)Wellhead with annular valves and seals and the required integrity to contain reservoir pressure.
(G)Casing with a hanger and seal assembly.
(H)Any other well construction requirements the supervisor determines would improve the protection of public health, safety, the environment, and natural resources.
(4)In developing the regulations, the division shall develop a schedule for ongoing mechanical integrity testing.
(e)In order to facilitate consistency, standardization, and training for site inspection and maintenance, to the extent that the regulations promulgated by the division pursuant to subdivision (d) address surface equipment associated with an underground gas storage facility, the division shall ensure that those regulations are consistent with comparable requirements in Parts 190 to 199, inclusive, of Title 49 of the Code of Federal Regulations.
3181.(a)The operator of a gas storage well shall submit for the supervisors approval the following materials:
(1)Data describing the gas storage project and gas storage wells that demonstrate that stored gas will be confined to the approved zone or zones. Updated data shall be provided to the division if conditions change or if more accurate data become available.
(2)A risk management plan to identify and plan for mitigation of all threats and hazards and potential threats and hazards associated with gas storage well operation in order to ensure internal and external mechanical integrity of a well, including site-specific information. The risk management plan shall provide for regular review and revision, as needed, to ensure the plan appropriately reflects current conditions. The risk management plan shall include, but is not limited to, all of the following:
(A)A natural gas leak prevention and response program that addresses the full range of natural gas leaks possible at the facility with specific response plans that provide for immediate control of the leak. The operator shall consult with local emergency response entities on the response plans. The prevention and response program shall include, but is not limited to, all of the following:
(i)A protocol for public notice of a large, uncontrollable leak to any potentially impacted community, as defined in the risk management plan, if the leak cannot be controlled within 48 hours of discovery by the operator.
(ii)Prepositioning, as feasible, and identification of materials and personnel necessary to respond to leaks. This shall include materials and equipment to respond to and stop the leak itself as well as to protect public health.
(iii)The identification of personnel responsible for notifying regulatory authorities with jurisdiction over the range of leaks possible.
(B)A plan for corrosion monitoring and evaluation.
(C)A schedule for regular well and reservoir integrity assessments.
(D)An assessment of the risks associated with the gas storage well and its operation.
(E)Planned risk mitigation efforts.
(F)A regular maintenance program for the well and the portion of the facility within the divisions jurisdiction. The maintenance program shall include training for site personnel and proactive replacement of equipment at risk of failure to ensure safe operation.
(3)In addition to other factors deemed relevant by the supervisor, the risk management plan required in paragraph (2) shall consider all of the following:
(A)The facilitys distance from dwellings, other buildings intended for human occupancy, or other well-defined outside areas where people may assemble such as campgrounds, recreational areas, or playgrounds.
(B)The risks to and from the well related to roadways, rights of way, railways, airports, and industrial facilities.
(C)Proximity to environmentally or culturally sensitive areas.
(D)The risks of well sabotage.
(E)The current and predicted development of the surrounding area.
(F)Topography and local wind patterns.
(b)All of the materials described in subdivision (a) shall be reported to the division according to a schedule approved by the supervisor. The operator shall not deviate from the programs, plans, and other conditions and protocols contained in the materials without prior written approval by the supervisor.
3182.On a weekly basis, the division shall post a list of notices received pursuant to Section 3203 on the divisions Internet Web site. Copies of any notice shall be provided to members of the public upon request.
3183.(a)The division, in consultation with the State Air Resources Board, shall determine and adopt by regulation what constitutes a reportable leak from a gas storage well and the timeframe for reporting that leak. The regulations shall require an operator to immediately report to the division a leak that poses a significant present or potential hazard to public health and safety, property, or to the environment.
(b)Until the regulations pursuant to subdivision (a) are in effect, a leak of any size from a gas storage well shall be deemed a reportable leak, and the operator shall notify the division immediately.
(c)If a leak from a gas storage well that is reported to the division pursuant to subdivision (a) or (b), as applicable, cannot be controlled within 48 hours, the division shall post information about the leak on its Internet Web site and provide regular updates to the public until the leak is stopped.
3184.(a)Within 72 hours of being notified of a reportable leak, pursuant to Section 3183, the supervisor shall determine if the reportable leak poses a significant present or potential hazard to public health and safety, property, or to the environment such that a relief well is necessary. If the supervisor makes that determination, the operator shall immediately begin preparation for, and, as soon as practicable at the determination of the supervisor, commence the drilling of, a relief well.
(b)Nothing in subdivision (a) shall prevent the supervisor from making a determination after the initial 72-hour period that a reportable leak poses a significant hazard to public health and safety, property, or to the environment and that a relief well is necessary. If the supervisor makes that determination, the operator shall immediately begin preparation for, and, as soon as practicable at the determination of the supervisor, commence the drilling of, a relief well.
(c)If the operator is required to drill a relief well under subdivision (a) or (b), the operators efforts to drill the relief well shall continue until the reportable leak has been stopped and the cause of the reportable leak has been fully addressed or the supervisor determines that other means of controlling the reportable leak are appropriate.
3185.The division shall perform unannounced random onsite inspections of some gas storage wells annually. The results shall be posted and available to the public on the divisions Internet Web site.
3186.An operator of a gas storage well shall develop and maintain a comprehensive gas storage well training and mentoring program for those employees whose job duties involve the safety of operations and maintenance of gas storage wells and associated equipment. The training program shall include, but is not limited to, gas storage well operations, including best practices to prevent leaks, maintenance and testing, gas storage well safety regulations, emergency response, and incident reporting. If storage field employees are represented by a labor union, the operator shall consult with the relevant union local on safety issues and, when requested, establish a framework to provide training through a joint labor-management training program.
3187.All materials provided to the division and approved by the supervisor to comply with Sections 3181, 3184, and 3185 shall be posted and available to the public on the Internet Web site of the division in a timely manner.
SEC. 4.Section 3403.5 of the Public Resources Code is amended to read:3403.5.(a)The Legislature finds that there are underground storage facilities for gas that utilize depleted or partially depleted oil or gas reservoirs. Purchased gas, usually from out of state, is injected for storage and withdrawn during peak load periods. The supervisor is required to maintain surveillance over these facilities to ensure that the original reserves are not lost, that drilling of new wells is conducted properly, and that no damage occurs to the environment by reason of injection and withdrawal of gas.
(b)In order to help support the regulatory effort of the supervisor, there shall be imposed an annual charge on operators of underground gas storage facilities to defray the regulatory costs incurred by the state in conducting the activities described in subdivision (a). Each underground gas storage facility operator shall pay a proportionate share of the total regulatory costs projected for each fiscal year based on the field capacity and number of wells for each underground gas storage facility. For each underground gas storage facility, the portion owed by the operator shall be computed by multiplying the operators field capacity by the number of the operators wells, and dividing that product by the statewide sum across all underground gas storage facilities of the product of the field capacity of each individual underground gas storage facility multiplied by the number of wells at that facility.
(c)In order to defray the costs of the response effort of the division in the event of a large, uncontrolled release of gas from an underground storage facility that poses a significant present or potential hazard to public health and safety, property, or to the environment, there shall be an additional charge imposed entirely on the operator of the underground storage facility at which the uncontrolled leak or release of gas occurred. The charge shall be in the amount of the total directly associated costs incurred by the division in the previous calendar year in the course of responding to the release, including personnel hours, travel expenses, contracting costs, and any other directly associated costs incurred by the division.
(d)For purposes of this section, the following terms have the following meanings:
(1)Field capacity means the total gas storage capacity, including base and working gas capacity, of an underground gas storage facility, in cubic feet.
(2)Wells means all wells associated with an underground gas storage facility except those that have been plugged and abandoned pursuant to Section 3208 before the preceding calendar year.
SEC. 5.Section 1103 is added to the Public Utilities Code, to read:1103.(a)If a new underground gas storage facility is proposed, the commission shall ensure that a risk assessment evaluating the potential impact of a leak from the facility on public and environmental health, safety, and welfare is conducted by the project proponent. Both acute and chronic exposures from a range of expected emissions and emissions rates shall be evaluated. The evaluation shall include consideration of population density in proximal communities, environmentally sensitive areas, emergency response times, evacuation times, possible leak duration, possible chemical species emitted, and local meteorology.
(b)In evaluating the potential risks and impacts of acute and chronic exposures from emissions from a proposed new gas storage facility, the project proponent shall assess or cause to be assessed risks associated with the proposed facilitys proximity to any living quarters, including private homes, condominiums, apartments, retirement homes, prisons, dormitories, or other housing; education resources, including preschools and schools operating kindergarten or any of grades 1 to 12, inclusive; day care centers; and health care facilities, including hospitals, nursing homes, and long-term care and hospice facilities. Based on the risk analysis, appropriate setbacks to the listed structure types shall be determined by the commission.
(c)The risk assessment conducted pursuant to this section shall be subjected to peer review by independent experts whose demonstrated expertise includes, but is not limited to, the fields of public health, epidemiology, and toxicology.
(d)The findings of any risk assessment required by this section shall be reported to the Legislature in accordance with Section 9795 of the Government Code.
SEC. 6.(a)Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, including subdivisions (e) and (h) of Section 11346.1 of the Government Code, the emergency regulations amending Section 1724.9 of Title 14 of the California Code of Regulations adopted by the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation effective February 5, 2016, shall continue in effect until the adoption, amendment, or repeal of the regulations is promulgated by the division pursuant to Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code.
(b)This section shall remain in effect only until January 1, 2019, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2019, deletes or extends that date.
SEC. 7.This act shall neither impair nor diminish requirements imposed by Chapter 14 of the Statutes of 2016 related to the Aliso Canyon natural gas storage facility located in the County of Los Angeles.
SEC. 8.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares as follows:
(a)Public transparency regarding risks, the regulations designed to mitigate those risks, and regulatory activity are essential to protect public health and welfare and natural resources.
(b)Public disclosure and safe operation of gas storage wells and associated piping and equipment are essential in order to provide for public, environmental, and occupational health and welfare, including a proactive approach to potential problems.
(c)On October 23, 2015, a significant, uncontrolled leak from a natural gas storage well that was originally drilled over 60 years ago was discovered in the Aliso Canyon natural gas storage facility located in the County of Los Angeles. Initial efforts to stop the leak failed.
(d)The Division of Oil, Gas, and Geothermal Resources in the Department of Conservation responded swiftly to the leak, including by issuing two orders that, among other things, require the use of relief wells. The division worked around the clock overseeing efforts to stop the leak.
(e)It was several days before the community was notified of the leak, although numerous residents started reporting odor concerns almost immediately. The leaking well is up the hill and approximately one and one-quarter miles away from the nearest home. Other natural gas storage wells serving this facility are located closer to homes and businesses.
(f)The operator of the leaking well had removed a subsurface safety valve decades earlier and had not replaced it. Regulations in effect at that time did not require approval or replacement of the valve. There was no automatic downhole shutoff system installed in the event of a leak. In 2014, the operator acknowledged publicly in a filing to the Public Utilities Commission that many of its wells needed additional assessment and repair. There was no requirement to disclose to potential homebuyers and business owners the existence of the Aliso Canyon natural gas storage facility and its attendant risks.
(g)The Governor declared a state of emergency on January 6, 2016, in order to facilitate the ongoing state response and efforts to stop the leak.
(h)On February 18, 2016, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation certified that the Aliso Canyon leak had been stopped. Reports estimate almost 100,000 metric tons of the potent greenhouse gas methane were emitted to the atmosphere. In addition to climate risks, community health concerns continue postleak with hundreds of complaints reported to the County of Los Angeles along with widespread concern about the short- and long-term impacts of the leak on public health and economic welfare in the area.
(i)The standards for natural gas storage wells need to be improved in order to reflect 21st century technology, disclose and mitigate any risks associated with those wells, recognize that these facilities may be in locations near population centers, and ensure a disaster like the Aliso Canyon leak does not happen again.
SEC. 2.Chapter 6 (commencing with Section 42710) is added to Part 4 of Division 26 of the Health and Safety Code, to read:6.Natural Gas Storage Facility Monitoring42710.(a)The state board, in consultation with any local air district and the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation, shall develop a natural gas storage facility monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks and the presence of natural gas emissions in the atmosphere. The continuous monitoring program may be supplemented by daily leak detection measurements.
(b)(1)The program shall include guidelines for the continuous monitoring which shall include, at minimum, optical gas imaging, where applicable, and accurate quantitative monitoring of natural gas concentrations. The program shall include protocols for both stationary and mobile monitoring, as well as fixed and temporary monitoring locations.
(2)The program shall require optical gas imaging when a large, ongoing leak occurs.
(c)An operator of a natural gas storage facility shall develop and submit to the state board a facility monitoring plan that satisfies program requirements pursuant to subdivisions (a) and (b). The state board shall review the plan and may approve or disapprove the plan.
(d)An operator of a natural gas storage facility shall conduct monitoring in accordance with the facility monitoring plan approved by the state board pursuant to subdivision (c).
(e)An operator of a natural gas storage facility shall provide monitoring data to the state board. All materials provided to comply with this section shall be posted and available to the public on the Internet Web site of the state board.
SEC. 3.Article 3.5 (commencing with Section 3180) is added to Chapter 1 of Division 3 of the Public Resources Code, to read:3.5.Natural Gas Storage Wells3180.(a)As used in this article, gas storage well means an active or idle well used primarily to inject natural gas into or withdraw natural gas from an underground natural gas storage facility.
(b)On or before January 1, 2018, the operators of all gas storage wells shall have commenced a mechanical integrity testing regime specified by the division. The testing regime shall include all of the following:
(1)Regular leak testing.
(2)Casing wall thickness inspection.
(3)Pressure test of the production casing.
(4)Any additional testing deemed necessary by the division to demonstrate the integrity of the well.
(c)All anomalies identified in the testing shall be immediately reported to the appropriate district office and explained to the supervisors satisfaction.
(d)(1)The division shall promulgate regulations that establish standards for the design, construction, and maintenance of all gas storage wells to ensure that integrity concerns with a gas storage well are identified and addressed before they can become a threat to life, health, property, the climate, or natural resources.
(2)The regulations shall require that gas storage wells be designed, constructed, and maintained to ensure that a single point of failure does not pose an immediate threat of loss of control of fluids, as determined by the supervisor.
(3)In developing the regulations, the division shall consider enhanced design, construction, and maintenance measures that could meet the standard in paragraph (2), including any of the following:
(A)Primary and secondary mechanical well barriers to isolate the storage gas within the storage reservoir and transfer storage gas from the surface into and out of the storage reservoir.
(B)Production casing to the surface with the required integrity to contain reservoir pressure.
(C)Tubing and packer and production tree with the required integrity to contain reservoir pressure.
(D)Surface controlled subsurface safety valves or Christmas tree valves with the required integrity to contain reservoir pressure that halt flow through the well.
(E)Secondary barrier with overlapping cement casing between two concentric casings with good quality cement bond.
(F)Wellhead with annular valves and seals and the required integrity to contain reservoir pressure.
(G)Casing with a hanger and seal assembly.
(H)Any other well construction requirements the supervisor determines would improve the protection of public health, safety, the environment, and natural resources.
(4)In developing the regulations, the division shall develop a schedule for ongoing mechanical integrity testing.
(e)In order to facilitate consistency, standardization, and training for site inspection and maintenance, to the extent that the regulations promulgated by the division pursuant to subdivision (d) address surface equipment associated with an underground gas storage facility, the division shall ensure that those regulations are consistent with comparable requirements in Parts 190 to 199, inclusive, of Title 49 of the Code of Federal Regulations.
3181.(a)The operator of a gas storage well shall submit for the supervisors approval the following materials:
(1)Data describing the gas storage project and gas storage wells that demonstrate that stored gas will be confined to the approved zone or zones. Updated data shall be provided to the division if conditions change or if more accurate data become available.
(2)A risk management plan to identify and plan for mitigation of all threats and hazards and potential threats and hazards associated with gas storage well operation in order to ensure internal and external mechanical integrity of a well, including site-specific information. The risk management plan shall provide for regular review and revision, as needed, to ensure the plan appropriately reflects current conditions. The risk management plan shall include, but is not limited to, all of the following:
(A)A natural gas leak prevention and response program that addresses the full range of natural gas leaks possible at the facility with specific response plans that provide for immediate control of the leak. The operator shall consult with local emergency response entities on the response plans. The prevention and response program shall include, but is not limited to, all of the following:
(i)A protocol for public notice of a large, uncontrollable leak to any potentially impacted community, as defined in the risk management plan, if the leak cannot be controlled within 48 hours of discovery by the operator.
(ii)Prepositioning, as feasible, and identification of materials and personnel necessary to respond to leaks. This shall include materials and equipment to respond to and stop the leak itself as well as to protect public health.
(iii)The identification of personnel responsible for notifying regulatory authorities with jurisdiction over the range of leaks possible.
(B)A plan for corrosion monitoring and evaluation.
(C)A schedule for regular well and reservoir integrity assessments.
(D)An assessment of the risks associated with the gas storage well and its operation.
(E)Planned risk mitigation efforts.
(F)A regular maintenance program for the well and the portion of the facility within the divisions jurisdiction. The maintenance program shall include training for site personnel and proactive replacement of equipment at risk of failure to ensure safe operation.
(3)In addition to other factors deemed relevant by the supervisor, the risk management plan required in paragraph (2) shall consider all of the following:
(A)The facilitys distance from dwellings, other buildings intended for human occupancy, or other well-defined outside areas where people may assemble such as campgrounds, recreational areas, or playgrounds.
(B)The risks to and from the well related to roadways, rights of way, railways, airports, and industrial facilities.
(C)Proximity to environmentally or culturally sensitive areas.
(D)The risks of well sabotage.
(E)The current and predicted development of the surrounding area.
(F)Topography and local wind patterns.
(b)All of the materials described in subdivision (a) shall be reported to the division according to a schedule approved by the supervisor. The operator shall not deviate from the programs, plans, and other conditions and protocols contained in the materials without prior written approval by the supervisor.
3182.On a weekly basis, the division shall post a list of notices received pursuant to Section 3203 on the divisions Internet Web site. Copies of any notice shall be provided to members of the public upon request.
3183.(a)The division, in consultation with the State Air Resources Board, shall determine and adopt by regulation what constitutes a reportable leak from a gas storage well and the timeframe for reporting that leak. The regulations shall require an operator to immediately report to the division a leak that poses a significant present or potential hazard to public health and safety, property, or to the environment.
(b)Until the regulations pursuant to subdivision (a) are in effect, a leak of any size from a gas storage well shall be deemed a reportable leak, and the operator shall notify the division immediately.
(c)If a leak from a gas storage well that is reported to the division pursuant to subdivision (a) or (b), as applicable, cannot be controlled within 48 hours, the division shall post information about the leak on its Internet Web site and provide regular updates to the public until the leak is stopped.
3184.(a)Within 72 hours of being notified of a reportable leak, pursuant to Section 3183, the supervisor shall determine if the reportable leak poses a significant present or potential hazard to public health and safety, property, or to the environment such that a relief well is necessary. If the supervisor makes that determination, the operator shall immediately begin preparation for, and, as soon as practicable at the determination of the supervisor, commence the drilling of, a relief well.
(b)Nothing in subdivision (a) shall prevent the supervisor from making a determination after the initial 72-hour period that a reportable leak poses a significant hazard to public health and safety, property, or to the environment and that a relief well is necessary. If the supervisor makes that determination, the operator shall immediately begin preparation for, and, as soon as practicable at the determination of the supervisor, commence the drilling of, a relief well.
(c)If the operator is required to drill a relief well under subdivision (a) or (b), the operators efforts to drill the relief well shall continue until the reportable leak has been stopped and the cause of the reportable leak has been fully addressed or the supervisor determines that other means of controlling the reportable leak are appropriate.
3185.The division shall perform unannounced random onsite inspections of some gas storage wells annually. The results shall be posted and available to the public on the divisions Internet Web site.
3186.An operator of a gas storage well shall develop and maintain a comprehensive gas storage well training and mentoring program for those employees whose job duties involve the safety of operations and maintenance of gas storage wells and associated equipment. The training program shall include, but is not limited to, gas storage well operations, including best practices to prevent leaks, maintenance and testing, gas storage well safety regulations, emergency response, and incident reporting. If storage field employees are represented by a labor union, the operator shall consult with the relevant union local on safety issues and, when requested, establish a framework to provide training through a joint labor-management training program.
3187.All materials provided to the division and approved by the supervisor to comply with Sections 3181, 3184, and 3185 shall be posted and available to the public on the Internet Web site of the division in a timely manner.
SEC. 4.Section 3403.5 of the Public Resources Code is amended to read:3403.5.(a)The Legislature finds that there are underground storage facilities for gas that utilize depleted or partially depleted oil or gas reservoirs. Purchased gas, usually from out of state, is injected for storage and withdrawn during peak load periods. The supervisor is required to maintain surveillance over these facilities to ensure that the original reserves are not lost, that drilling of new wells is conducted properly, and that no damage occurs to the environment by reason of injection and withdrawal of gas.
(b)In order to help support the regulatory effort of the supervisor, there shall be imposed an annual charge on operators of underground gas storage facilities to defray the regulatory costs incurred by the state in conducting the activities described in subdivision (a). Each underground gas storage facility operator shall pay a proportionate share of the total regulatory costs projected for each fiscal year based on the field capacity and number of wells for each underground gas storage facility. For each underground gas storage facility, the portion owed by the operator shall be computed by multiplying the operators field capacity by the number of the operators wells, and dividing that product by the statewide sum across all underground gas storage facilities of the product of the field capacity of each individual underground gas storage facility multiplied by the number of wells at that facility.
(c)In order to defray the costs of the response effort of the division in the event of a large, uncontrolled release of gas from an underground storage facility that poses a significant present or potential hazard to public health and safety, property, or to the environment, there shall be an additional charge imposed entirely on the operator of the underground storage facility at which the uncontrolled leak or release of gas occurred. The charge shall be in the amount of the total directly associated costs incurred by the division in the previous calendar year in the course of responding to the release, including personnel hours, travel expenses, contracting costs, and any other directly associated costs incurred by the division.
(d)For purposes of this section, the following terms have the following meanings:
(1)Field capacity means the total gas storage capacity, including base and working gas capacity, of an underground gas storage facility, in cubic feet.
(2)Wells means all wells associated with an underground gas storage facility except those that have been plugged and abandoned pursuant to Section 3208 before the preceding calendar year.
SEC. 5.Section 1103 is added to the Public Utilities Code, to read:1103.(a)If a new underground gas storage facility is proposed, the commission shall ensure that a risk assessment evaluating the potential impact of a leak from the facility on public and environmental health, safety, and welfare is conducted by the project proponent. Both acute and chronic exposures from a range of expected emissions and emissions rates shall be evaluated. The evaluation shall include consideration of population density in proximal communities, environmentally sensitive areas, emergency response times, evacuation times, possible leak duration, possible chemical species emitted, and local meteorology.
(b)In evaluating the potential risks and impacts of acute and chronic exposures from emissions from a proposed new gas storage facility, the project proponent shall assess or cause to be assessed risks associated with the proposed facilitys proximity to any living quarters, including private homes, condominiums, apartments, retirement homes, prisons, dormitories, or other housing; education resources, including preschools and schools operating kindergarten or any of grades 1 to 12, inclusive; day care centers; and health care facilities, including hospitals, nursing homes, and long-term care and hospice facilities. Based on the risk analysis, appropriate setbacks to the listed structure types shall be determined by the commission.
(c)The risk assessment conducted pursuant to this section shall be subjected to peer review by independent experts whose demonstrated expertise includes, but is not limited to, the fields of public health, epidemiology, and toxicology.
(d)The findings of any risk assessment required by this section shall be reported to the Legislature in accordance with Section 9795 of the Government Code.
SEC. 6.(a)Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, including subdivisions (e) and (h) of Section 11346.1 of the Government Code, the emergency regulations amending Section 1724.9 of Title 14 of the California Code of Regulations adopted by the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation effective February 5, 2016, shall continue in effect until the adoption, amendment, or repeal of the regulations is promulgated by the division pursuant to Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code.
(b)This section shall remain in effect only until January 1, 2019, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2019, deletes or extends that date.
SEC. 7.This act shall neither impair nor diminish requirements imposed by Chapter 14 of the Statutes of 2016 related to the Aliso Canyon natural gas storage facility located in the County of Los Angeles.
SEC. 8.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares as follows:
(a)Public transparency regarding risks, the regulations designed to mitigate those risks, and regulatory activity are essential to protect public health and welfare and natural resources.
(b)Public disclosure and safe operation of gas storage wells and associated piping and equipment are essential in order to provide for public, environmental, and occupational health and welfare, including a proactive approach to potential problems.
(c)On October 23, 2015, a significant, uncontrolled leak from a natural gas storage well that was originally drilled over 60 years ago was discovered in the Aliso Canyon natural gas storage facility located in the County of Los Angeles. Initial efforts to stop the leak failed.
(d)The Division of Oil, Gas, and Geothermal Resources in the Department of Conservation responded swiftly to the leak, including by issuing two orders that, among other things, require the use of relief wells. The division worked around the clock overseeing efforts to stop the leak.
(e)It was several days before the community was notified of the leak, although numerous residents started reporting odor concerns almost immediately. The leaking well is up the hill and approximately one and one-quarter miles away from the nearest home. Other natural gas storage wells serving this facility are located closer to homes and businesses.
(f)The operator of the leaking well had removed a subsurface safety valve decades earlier and had not replaced it. Regulations in effect at that time did not require approval or replacement of the valve. There was no automatic downhole shutoff system installed in the event of a leak. In 2014, the operator acknowledged publicly in a filing to the Public Utilities Commission that many of its wells needed additional assessment and repair. There was no requirement to disclose to potential homebuyers and business owners the existence of the Aliso Canyon natural gas storage facility and its attendant risks.
(g)The Governor declared a state of emergency on January 6, 2016, in order to facilitate the ongoing state response and efforts to stop the leak.
(h)On February 18, 2016, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation certified that the Aliso Canyon leak had been stopped. Reports estimate almost 100,000 metric tons of the potent greenhouse gas methane were emitted to the atmosphere. In addition to climate risks, community health concerns continue postleak with hundreds of complaints reported to the County of Los Angeles along with widespread concern about the short- and long-term impacts of the leak on public health and economic welfare in the area.
(i)The standards for natural gas storage wells need to be improved in order to reflect 21st century technology, disclose and mitigate any risks associated with those wells, recognize that these facilities may be in locations near population centers, and ensure a disaster like the Aliso Canyon leak does not happen again.
SEC. 2.Chapter 6 (commencing with Section 42710) is added to Part 4 of Division 26 of the Health and Safety Code, to read:6.Natural Gas Storage Facility Monitoring42710.(a)The state board, in consultation with any local air district and the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation, shall develop a natural gas storage facility monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks and the presence of natural gas emissions in the atmosphere. The continuous monitoring program may be supplemented by daily leak detection measurements.
(b)(1)The program shall include guidelines for the continuous monitoring which shall include, at minimum, optical gas imaging, where applicable, and accurate quantitative monitoring of natural gas concentrations. The program shall include protocols for both stationary and mobile monitoring, as well as fixed and temporary monitoring locations.
(2)The program shall require optical gas imaging when a large, ongoing leak occurs.
(c)An operator of a natural gas storage facility shall develop and submit to the state board a facility monitoring plan that satisfies program requirements pursuant to subdivisions (a) and (b). The state board shall review the plan and may approve or disapprove the plan.
(d)An operator of a natural gas storage facility shall conduct monitoring in accordance with the facility monitoring plan approved by the state board pursuant to subdivision (c).
(e)An operator of a natural gas storage facility shall provide monitoring data to the state board. All materials provided to comply with this section shall be posted and available to the public on the Internet Web site of the state board.
SEC. 3.Article 3.5 (commencing with Section 3180) is added to Chapter 1 of Division 3 of the Public Resources Code, to read:3.5.Natural Gas Storage Wells3180.(a)As used in this article, gas storage well means an active or idle well used primarily to inject natural gas into or withdraw natural gas from an underground natural gas storage facility.
(b)On or before January 1, 2018, the operators of all gas storage wells shall have commenced a mechanical integrity testing regime specified by the division. The testing regime shall include all of the following:
(1)Regular leak testing.
(2)Casing wall thickness inspection.
(3)Pressure test of the production casing.
(4)Any additional testing deemed necessary by the division to demonstrate the integrity of the well.
(c)All anomalies identified in the testing shall be immediately reported to the appropriate district office and explained to the supervisors satisfaction.
(d)(1)The division shall promulgate regulations that establish standards for the design, construction, and maintenance of all gas storage wells to ensure that integrity concerns with a gas storage well are identified and addressed before they can become a threat to life, health, property, the climate, or natural resources.
(2)The regulations shall require that gas storage wells be designed, constructed, and maintained to ensure that a single point of failure does not pose an immediate threat of loss of control of fluids, as determined by the supervisor.
(3)In developing the regulations, the division shall consider enhanced design, construction, and maintenance measures that could meet the standard in paragraph (2), including any of the following:
(A)Primary and secondary mechanical well barriers to isolate the storage gas within the storage reservoir and transfer storage gas from the surface into and out of the storage reservoir.
(B)Production casing to the surface with the required integrity to contain reservoir pressure.
(C)Tubing and packer and production tree with the required integrity to contain reservoir pressure.
(D)Surface controlled subsurface safety valves or Christmas tree valves with the required integrity to contain reservoir pressure that halt flow through the well.
(E)Secondary barrier with overlapping cement casing between two concentric casings with good quality cement bond.
(F)Wellhead with annular valves and seals and the required integrity to contain reservoir pressure.
(G)Casing with a hanger and seal assembly.
(H)Any other well construction requirements the supervisor determines would improve the protection of public health, safety, the environment, and natural resources.
(4)In developing the regulations, the division shall develop a schedule for ongoing mechanical integrity testing.
(e)In order to facilitate consistency, standardization, and training for site inspection and maintenance, to the extent that the regulations promulgated by the division pursuant to subdivision (d) address surface equipment associated with an underground gas storage facility, the division shall ensure that those regulations are consistent with comparable requirements in Parts 190 to 199, inclusive, of Title 49 of the Code of Federal Regulations.
3181.(a)The operator of a gas storage well shall submit for the supervisors approval the following materials:
(1)Data describing the gas storage project and gas storage wells that demonstrate that stored gas will be confined to the approved zone or zones. Updated data shall be provided to the division if conditions change or if more accurate data become available.
(2)A site-specific risk management plan to identify and plan for mitigation of all threats and hazards and potential threats and hazards associated with gas storage well operation in order to ensure internal and external mechanical integrity of a well. well, including site-specific information. The risk management plan shall provide for regular review and revision, as needed, to ensure the plan appropriately reflects current conditions. The operator shall consult with local emergency response entities on the risk management plan. The risk management plan shall include, but is not limited to, all of the following:
(A)A natural gas leak prevention and response program that addresses the full range of natural gas leaks possible at the facility with specific response plans that provide for immediate control of the leak. The operator shall consult with local emergency response entities on the response plans. The prevention and response program shall include, but is not limited to, all of the following:
(i)A protocol for public notice of a large, uncontrollable leak to any community within two miles of the leak potentially impacted community, as defined in the risk management plan, if the leak cannot be controlled within 48 hours of discovery by the operator.
(ii)Prepositioning, as feasible, and identification of materials and personnel necessary to respond to leaks. This shall include materials and equipment to respond to and stop the leak itself as well as to protect public health.
(iii)The identification of personnel responsible for notifying regulatory authorities with jurisdiction over the range of leaks possible.
(B)A plan for corrosion monitoring and evaluation.
(C)A schedule for regular well and reservoir integrity assessments.
(D)An assessment of the risks associated with the gas storage well and its operation.
(E)Planned risk mitigation efforts.
(F)A regular maintenance program for the well and the portion of the facility within the divisions jurisdiction. The maintenance program shall include training for site personnel and proactive replacement of equipment at risk of failure to ensure safe operation.
(3)In addition to other factors deemed relevant by the supervisor, the risk management plan required in paragraph (2) shall consider all of the following:
(A)The facilitys distance from dwellings, other buildings intended for human occupancy, or other well-defined outside areas where people may assemble such as campgrounds, recreational areas, or playgrounds.
(B)The risks to and from the well related to roadways, rights of way, railways, airports, and industrial facilities.
(C)Proximity to environmentally or culturally sensitive areas.
(D)The risks of well sabotage.
(E)The current and predicted development of the surrounding area.
(F)Topography and local wind patterns.
(b)All of the materials described in subdivision (a) shall be reported to the division according to a schedule approved by the supervisor. The operator shall not deviate from the programs, plans, and other conditions and protocols contained in the materials without prior written approval by the supervisor.
3182.On a weekly basis, the division shall post a list of notices received pursuant to Section 3203 on the divisions Internet Web site. Copies of any notice shall be provided to members of the public upon request.
3183.(a)The division, in consultation with the State Air Resources Board, shall determine and adopt by regulation what constitutes a reportable leak from a gas storage well and the timeframe for reporting that leak. The regulations shall require an operator to immediately report to the division a leak that poses a significant present or potential hazard to public health and safety, property, or to the environment.
(b)Until the regulations pursuant to subdivision (a) are in effect, a leak of any size from a gas storage well shall be deemed a reportable leak, and the operator shall notify the division immediately.
(c)If a leak from a gas storage well that is reported to the division pursuant to subdivision (a) or (b), as applicable, cannot be controlled within 48 hours, the division shall post information about the leak on its Internet Web site and provide regular updates to the public until the leak is stopped.
3184.(a)Within 72 hours of being notified of a reportable leak, pursuant to Section 3183, the supervisor shall determine if the reportable leak poses a significant present or potential hazard to public health and safety, property, or to the environment such that a relief well is necessary. If the supervisor makes that determination, the operator shall immediately begin preparation for, and and, as soon as practicable at the determination of the supervisor, commence the drilling of, a relief well.
(b)Nothing in subdivision (a) shall prevent the supervisor from making a determination after the initial 72-hour period that a reportable leak poses a significant hazard to public health and safety, property, or to the environment and that a relief well is necessary. If the supervisor makes that determination, the operator shall immediately begin preparation for, and and, as soon as practicable at the determination of the supervisor, commence the drilling of, a relief well.
(c)If the operator is required to drill a relief well under subdivision (a) or (b), the operators efforts to drill the relief well shall continue until the reportable leak has been stopped and the cause of the reportable leak has been fully addressed or the supervisor determines that other means of controlling the reportable leak are appropriate.
3185.The division shall perform unannounced random onsite inspections of some gas storage wells annually. The results shall be posted and available to the public on the divisions Internet Web site.
3186.An operator of a gas storage well shall develop and maintain a comprehensive gas storage well training and mentoring program for those employees whose job duties involve the safety of operations and maintenance of gas storage wells and associated equipment. The training program shall include, but is not limited to, gas storage well operations, including best practices to prevent leaks, maintenance and testing, gas storage well safety regulations, emergency response, and incident reporting. If storage field employees are represented by a labor union, the operator shall consult with the relevant union local on safety issues and, when requested, establish a framework to provide training through a joint labor-management training program.
3187.All materials provided to the division and approved by the supervisor to comply with Sections 3181, 3184, and 3185 shall be posted and available to the public on the Internet Web site of the division in a timely manner.
SEC. 4.Section 3403.5 of the Public Resources Code is amended to read:3403.5.(a)The Legislature finds that there are underground storage facilities for gas that utilize depleted or partially depleted oil or gas reservoirs. Purchased gas, usually from out of state, is injected for storage and withdrawn during peak load periods. The supervisor is required to maintain surveillance over these facilities to ensure that the original reserves are not lost, that drilling of new wells is conducted properly, and that no damage occurs to the environment by reason of injection and withdrawal of gas.
(b)In order to help support the regulatory effort of the supervisor, there shall be imposed an annual charge on operators of underground gas storage facilities to defray the regulatory costs incurred by the state in conducting the activities described in subdivision (a). Each underground gas storage facility operator shall pay a proportionate share of the total regulatory costs projected for each fiscal year based on the field capacity and number of wells for each underground gas storage facility. For each underground gas storage facility, the portion owed by the operator shall be computed by multiplying the operators field capacity by the number of the operators wells, and dividing that product by the product statewide sum across all underground gas storage facilities of the product of the field capacity of all each individual underground gas storage facilities statewide facility multiplied by the number of wells for all underground gas storage facilities statewide. at that facility.
(c)In order to defray the costs of the response effort of the division in the event of a large, uncontrolled release of gas from an underground storage facility that poses a significant present or potential hazard to public health and safety, property, or to the environment, there shall be an additional charge imposed entirely on the operator of the underground storage facility at which the uncontrolled leak or release of gas occurred. The charge shall be in the amount of the total directly associated costs incurred by the division in the previous calendar year in the course of responding to the release, including personnel hours, travel expenses, contracting costs, and any other directly associated costs incurred by the division.
(d)For purposes of this section, the following terms have the following meanings:
(1)Field capacity means the total gas storage capacity capacity, including base and working gas capacity, of an underground gas storage facility, in cubic feet.
(2)Wells means all wells associated with an underground gas storage facility except those that have been plugged and abandoned pursuant to Section 3208 before the preceding calendar year.
SEC. 5.Section 1103 is added to the Public Utilities Code, to read:1103.(a)If a new underground gas storage facility is proposed, the commission shall ensure that a risk assessment evaluating the potential impact of a leak from the facility on public and environmental health, safety, and welfare is conducted by the project proponent. Both acute and chronic exposures from a range of expected emissions and emissions rates shall be evaluated. The evaluation shall include consideration of population density in proximal communities, environmentally sensitive areas, emergency response times, evacuation times, possible leak duration, possible chemical species emitted, and local meteorology.
(b)In evaluating the potential risks and impacts of acute and chronic exposures from emissions from a proposed new gas storage facility, the project proponent shall assess or cause to be assessed risks associated with the proposed facilitys proximity to any living quarters, including private homes, condominiums, apartments, retirement homes, prisons, dormitories, or other housing; education resources, including preschools and schools operating kindergarten or any of grades 1 to 12, inclusive; day care centers; and health care facilities, including hospitals, nursing homes, and long-term care and hospice facilities. Based on the risk analysis, appropriate setbacks to the listed structure types shall be determined by the commission.
(c)The risk assessment conducted pursuant to this section shall be subjected to peer review by independent experts whose demonstrated expertise includes, but is not limited to, the fields of public health, epidemiology, and toxicology.
(d)The findings of any risk assessment required by this section shall be reported to the Legislature in accordance with Section 9795 of the Government Code.
SEC. 6.(a)Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, including subdivisions (e) and (h) of Section 11346.1 of the Government Code, the emergency regulations amending Section 1724.9 of Title 14 of the California Code of Regulations adopted by the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation effective February 5, 2016, shall continue in effect until the adoption, amendment, or repeal of the regulations is promulgated by the division pursuant to Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code.
(b)This section shall remain in effect only until January 1, 2019, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2019, deletes or extends that date.
SEC. 7.This act shall neither impair nor diminish requirements imposed by Chapter 14 of the Statutes of 2016 related to the Aliso Canyon natural gas storage facility located in the County of Los Angeles.
SEC. 8.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares as follows:
(a)Public transparency regarding risks, the regulations designed to mitigate those risks, and regulatory activity are essential to protect public health and welfare and natural resources.
(b)Public disclosure and safe operation of gas storage wells and associated piping and equipment are essential in order to provide for public, environmental, and occupational health and welfare, including a proactive approach to potential problems.
(c)On October 23, 2015, a significant, uncontrolled leak from a natural gas storage well that was originally drilled over 60 years ago was discovered in the Aliso Canyon natural gas storage facility located in the County of Los Angeles. Initial efforts to stop the leak failed.
(d)The Division of Oil, Gas, and Geothermal Resources in the Department of Conservation responded swiftly to the leak, including by issuing two orders that, among other things, require the use of relief wells. The division worked around the clock overseeing efforts to stop the leak.
(e)It was several days before the community was notified of the leak, although numerous residents started reporting odor concerns almost immediately. The leaking well is up the hill and approximately one and one-quarter miles away from the nearest home. Other natural gas storage wells serving this facility are located closer to homes and businesses.
(f)The operator of the leaking well had removed a subsurface safety valve decades earlier and had not replaced it. Regulations in effect at that time did not require approval or replacement of the valve. There was no automatic downhole shutoff system installed in the event of a leak. In 2014, the operator acknowledged publicly in a filing to the Public Utilities Commission that many of its wells needed additional assessment and repair. There was no requirement to disclose to potential homebuyers and business owners the existence of the Aliso Canyon natural gas storage facility and its attendant risks.
(g)The Governor declared a state of emergency on January 6, 2016, in order to facilitate the ongoing state response and efforts to stop the leak.
(h)On February 18, 2016, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation certified that the Aliso Canyon leak had been stopped. Reports estimate almost 100,000 metric tons of the potent greenhouse gas methane were emitted to the atmosphere. Community In addition to climate risks, community health concerns continue postleak with hundreds of complaints reported to the County of Los Angeles along with widespread concern about the short- and long-term impacts of the leak on public health and economic welfare in the area.
(i)The standards for natural gas storage wells need to be improved in order to reflect 21st century technology, disclose and mitigate any risks associated with those wells, recognize that these facilities may be in locations near population centers, and ensure a disaster like the Aliso Canyon leak does not happen again.
SEC. 2.Chapter 6 (commencing with Section 42710) is added to Part 4 of Division 26 of the Health and Safety Code, to read:6.Natural Gas Storage Facility Monitoring42710.(a)The state board, in consultation with any local air district and the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation, shall develop a natural gas storage facility monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks and the presence of natural gas emissions in the atmosphere. The continuous monitoring program may be supplemented by daily leak detection measurements.
(b)(1)The program shall include guidelines for the continuous monitoring which shall include, at minimum, optical gas imaging imaging, where applicable, and accurate quantitative monitoring of natural gas concentrations. The program shall include protocols for both stationary and mobile monitoring, as well as fixed and temporary monitoring locations.
(2)The program shall require optical gas imaging when a large, ongoing leak occurs.
(c)An operator of a natural gas storage facility shall develop and submit to the state board a facility monitoring plan that satisfies program requirements pursuant to subdivision (a). subdivisions (a) and (b). The state board shall review the plan and may approve or disapprove the plan.
(d)An operator of a natural gas storage facility shall conduct monitoring in accordance with the facility monitoring plan approved by the state board pursuant to subdivision (c).
(d)Monitoring data shall be provided
(e)An operator of a natural gas storage facility shall provide monitoring data to the state board. All materials provided to comply with this section shall be posted and available to the public on the Internet Web site of the Division of Oil, Gas, and Geothermal Resources. state board.
SEC. 3.Section 3133 is added to the Public Resources Code, to read:3133.(a)(1)As used in this article, natural gas storage well means an active or idle well used solely to inject gas into or withdraw gas from an underground gas storage facility.
(2)(A)For purposes of this section, a low-risk natural gas storage well means a natural gas storage well that meets all of the following:
(i)The well is not subject to Section 3217.
(ii)The well is located in a nonurban area.
(iii)The well meets or exceeds current well construction standards for gas storage wells.
(iv)The well was constructed specifically for natural gas storage and was constructed after January 1, 1997.
(v)The well has a consistent and demonstrated record of mechanical integrity, as determined by the supervisor.
(vi)The well is in compliance with all other applicable requirements imposed by this article and the divisions regulations.
(B)(1)The division may deem any natural gas storage well as ineligible for classification as a low-risk natural gas storage well to protect public safety and natural resources.
(2)If the division exercises the authority provided in paragraph (1), the division shall make a written finding of that decision.
(b)Before January 1, 2018, and annually thereafter, all natural gas storage wells shall be tested across their entire length for a loss of integrity resulting in a leak and the results of the testing shall be reported to the division.
(c)(1)Except as provided in paragraph (2), all natural gas storage wells shall, on or before July 1, 2018, comply with both of the following:
(A)Have an automatic downhole shutoff system, including, but not limited to, surface-controlled subsurface safety valves, deployed in order to limit leaks associated with a loss of the integrity of a well, well casing, or cementing. The shutoff system shall be tested and the results of the test shall be reported to the division no less than semiannually.
(B)Conduct natural gas injection and production through tubing only and be isolated from contact with the well casing.
(2)All low-risk natural gas storage wells shall comply with subparagraphs (A) and (B) of paragraph (1) on or before July 1, 2019.
(d)The division shall review and update practices for the use of subsurface safety valves in natural gas storage wells to reflect the best practices established by independent experts pursuant to Section 3140.
(e)All newly constructed natural gas storage wells shall have a cement barrier, as determined by the supervisor.
(f)(1)The division may modify the requirements of subdivision (c) for low-risk natural gas storage wells to protect public safety and natural resources.
(2)If the division exercises the authority provided in paragraph (1), the division shall make a written finding of that decision.
(g)Nothing in this section shall be construed as limiting the supervisors authority to take action to respond to a hazard.
SEC. 4.Section 3134 is added to the Public Resources Code, to read:3134.A natural gas storage well shall meet all of the following requirements:
(a)(1)Baseline and follow-on proactive evaluations of the integrity of the well, well casing, and cementing across the entire length of the well shall be conducted to thoroughly, quantitatively, and accurately assess their condition. These assessments shall be performed using the best available technology. Based upon these assessments, the risks posed by erosion, corrosion, material deterioration, scaling, cracking, and any other process that may produce natural gas leaks shall be determined.
(2)By January 1, 2018, the division shall develop a schedule for the completion of baseline proactive evaluations for all natural gas storage wells.
(3)The division shall also develop a schedule for performing follow-on proactive evaluations for all natural gas storage wells in order to measure any changes in well condition after the baseline proactive evaluations are completed. The schedule shall be determined based upon an assessment of risk. The natural gas storage wells at lowest risk of a loss of integrity shall be reevaluated pursuant to this paragraph at least once every four years and natural gas storage wells at high risk of a loss of integrity shall be reevaluated pursuant to this paragraph at least annually.
(4)A natural gas storage well that has lost integrity or that is at risk of an imminent loss of integrity shall be immediately repaired before returning to service.
(b)Annular pressure and production or injection flow rate shall be continuously monitored.
SEC. 5.Section 3135 is added to the Public Resources Code, to read:3135.(a)For the purposes of this section, sensitive receptor means any living quarters, including private homes, condominiums, apartments, retirement homes, prisons, dormitories, or other housing; education resources, including preschools and schools operating kindergarten or any of grades 1 to 12, inclusive; daycare centers; and health care facilities, including hospitals, nursing homes, and long-term care and hospice facilities.
(b)The Office of Environmental Health Hazard Assessment and the State Department of Public Health, in consultation with the division, shall perform a science-based risk assessment of natural gas storage wells. The goal of the risk assessment shall be to determine appropriate setback distances for natural gas storage wells from different locations, activities, and receptors. The risk assessment shall include, but is not limited to, all of the following information:
(1)The construction, service history, and operating conditions of a well.
(2)The potential impact of a leak on public and environmental health, safety, and welfare. Both acute and chronic exposures for a range of expected emissions and emissions rates shall be considered.
(3)The factors relevant to determining setback distances including, but not limited to, population density, sensitive receptors, environmentally sensitive areas, emergency response times, evacuation times, leak duration, chemical species emitted, and local meteorology.
(4)The data necessary to determine appropriate setback distances.
(c)The risk assessment conducted pursuant to subdivision (b) shall be subjected to peer review by independent experts.
(d)The findings of the risk assessment required by subdivision (b) shall be reported to the Legislature in accordance with Section 9795 of the Government Code.
(e)Upon completion of the risk assessment required by subdivision (b), the division shall review and, as appropriate, revise its regulations.
SEC. 6.Section 3136 is added to the Public Resources Code, to read:3136.(a)The operator of a natural gas storage well shall submit for the supervisors approval the following materials:
(1)A regular maintenance program for the well and the portion of the facility within the divisions jurisdiction. The maintenance program shall include training for site personnel and proactive replacement of equipment at risk of failure to ensure safe operation.
(2)Design and operating conditions and parameters for the well and the portion of the facility within the divisions jurisdiction.
(3)An inspection, leak detection, and monitoring program for the well and the portion of the facility within the divisions jurisdiction that includes monitoring of natural gas concentrations pursuant to Chapter 6 (commencing with Section 42710) of Part 4 of Division 26 of the Health and Safety Code. Ambient natural gas monitoring sufficient to include monitoring of a new or reworked well shall be in operation before a new well is drilled or a well is reworked.
(4)A site-specific risk management plan to identify and plan for mitigation of all threats and hazards and potential threats and hazards associated with natural gas storage well operation in order to ensure internal and external mechanical integrity of a well. The risk management plan shall provide for regular review and revision, as needed, to ensure the plan appropriately reflects current conditions. The risk management plan shall include, but is not limited to, all of the following:
(A)A natural gas leak prevention and response program that addresses the full range of natural gas leaks possible at the facility with specific response plans that provide for immediate control of the leak. The prevention and response program shall include, but is not limited to, all of the following:
(i)A protocol for public notice of the leak to the community by the operator.
(ii)Prepositioning, as feasible, and identification of materials and personnel necessary to respond to leaks. This shall include materials and equipment to respond to and stop the leak itself as well as to protect public health.
(iii)A training program to ensure site personnel are prepared to respond to a leak, consistent with the requirements of Section 3144.
(B)A plan for corrosion monitoring and evaluation.
(C)A schedule for regular well and reservoir integrity assessments.
(D)An assessment of the risks associated with the natural gas storage well and its operation.
(E)Planned risk mitigation efforts.
(b)All of the materials described in subdivision (a) shall be approved by the supervisor, at his or her discretion, and in the possession of the division before the supervisor or district deputy approves a notice required pursuant to Section 3203.
(c)All of the materials described in subdivision (a) shall be reported to the division annually. The operator shall not deviate from the programs, plans, and other conditions and protocols contained in the materials without prior written approval by the supervisor.
SEC. 7.Section 3137 is added to the Public Resources Code, to read:3137.The public has a right to review the location of a natural gas storage well or conversion of an existing well to a natural gas storage well before the approval of any notice required pursuant to Section 3203.
SEC. 8.Section 3138 is added to the Public Resources Code, to read:3138.In the event of a loss of the integrity of a natural gas storage well, well casing, or cementing resulting in a large ongoing leak of natural gas and associated gases and materials that pose a significant present or potential hazard to public health and safety, property, or to the environment, preparations for the drilling of a relief well shall begin within 24 hours of the discovery of the leak regardless of any other activities undertaken to stop the leak.
SEC. 9.Section 3139 is added to the Public Resources Code, to read:3139.In the event of a leak of any size from a natural gas storage well, the operator shall notify the division immediately. Within 24 hours of notification, the division shall post information about the leak on its Internet Web site and provide regular updates to the public until the leak is stopped.
SEC. 10.Section 3140 is added to the Public Resources Code, to read:3140.(a)The division shall convene an independent panel of recognized experts to develop best practices for natural gas storage facilities. The panel shall consider at least all of the following:
(1)The proximity of a natural gas storage facility and wells to populations of people.
(2)The conditions at which a well should be plugged and abandoned, and what standards the plugging and abandonment should meet.
(3)The range of proactive methods to assess the integrity of a well, well casing, and cementing, and identifying the best available technology for these assessments.
(4)A thorough analysis of the risks associated with the conversion of a well for use as a natural gas storage well.
(5)Natural gas storage well design, operating, maintenance, and monitoring standards, including, but not limited to, placement of observation wells, soil monitoring, training, and well monitoring after plugging and abandonment.
(6)Risk assessment and management tools for all threats and hazards and potential threats and hazards associated with natural gas storage wells, including identifying data requirements for those tools, with the goal of providing for a standardized and comparable approach to evaluate natural gas storage wells statewide.
(7)Automatic shutoff systems including the location and placement of subsurface and surface safety valves, shutoff control systems, reliability, and appropriate use.
(b)Upon completion of the panels work pursuant to subdivision (a), the division shall review and incorporate best practices developed by the panel into its regulations for natural gas storage wells, if appropriate, and, to the extent those practices are applicable, for other wells under the divisions jurisdiction.
(c)The division shall periodically, and whenever necessary, review advances in relevant technologies and best practices for natural gas storage facilities and, if appropriate, shall incorporate changes in best practices into its regulations for natural gas storage wells and, to the extent those practices are applicable, for other wells under the divisions jurisdiction.
SEC. 11.Section 3141 is added to the Public Resources Code, to read:3141.In order to facilitate consistency, standardization, and training, the division shall, as feasible, incorporate federal regulations applicable to natural gas storage facilities, including, but not limited to, Parts 190 to 199, inclusive, of Title 49 of the Code of Federal Regulations into the divisions natural gas storage well regulations.
SEC. 12.Section 3142 is added to the Public Resources Code, to read:3142.To ensure that the division has all the records it needs to evaluate natural gas storage wells, the well history maintained pursuant to Section 3213 shall include all operations, injection, production, and emplacement of any materials into the well. The operator shall disclose the well history to the division for each operation, injection, production, and emplacement of any material into the well.
SEC. 13.Section 3143 is added to the Public Resources Code, to read:3143.The division shall perform unannounced random onsite inspections of some natural gas storage wells annually. The results shall be posted and available to the public on the divisions Internet Web site.
SEC. 14.Section 3144 is added to the Public Resources Code, to read:3144.An operator of a natural gas storage well shall develop and maintain a comprehensive gas storage well training and mentoring program for those employees whose job duties involve the safety of operations and maintenance of natural gas storage wells and associated equipment. The training program shall include, but is not limited to, gas storage well operations, including best practices to prevent leaks, maintenance and testing, gas storage well safety regulations, emergency response, and incident reporting. If employees are represented by a labor union, the operator shall consult with the union on safety issues and, when requested, establish a framework to provide training through a joint labor-management training program.
SEC. 15.Section 3145 is added to the Public Resources Code, to read:3145.All materials provided to the division to comply with Section 3133 to 3143, inclusive, shall be posted and available to the public on the Internet Web site of the division.
SEC. 16.Section 3146 is added to the Public Resources Code, to read:3146.A member of the public may bring suit for writ of mandate against the division for failure to enforce Sections 3133 to 3145, inclusive.
SEC. 17.Section 3236.5 of the Public Resources Code is amended to read:3236.5.(a)A person who violates this chapter or a regulation implementing this chapter is subject to a civil penalty not to exceed twenty-five thousand dollars ($25,000) for each violation. A person who commits a violation of Article 3 (commencing with Section 3150) or Section 3300 is subject to a civil penalty of not less than ten thousand dollars ($10,000) and not to exceed twenty-five thousand dollars ($25,000) per day per violation. An act of God and an act of vandalism beyond the reasonable control of the operator shall not be considered a violation. The civil penalty shall be imposed by an order of the supervisor pursuant to Section 3225 upon a determination that a violation has been committed by the person charged. The imposition of a civil penalty under this section shall be in addition to any other penalty provided by law for the violation. When establishing the amount of the civil penalty pursuant to this section, the supervisor shall consider, in addition to other relevant circumstances, all of the following:
(1)The extent of harm caused by the violation.
(2)The persistence of the violation.
(3)The pervasiveness of the violation.
(4)The number of prior violations by the same violator.
(b)An order of the supervisor imposing a civil penalty shall be reviewable pursuant to Article 6 (commencing with Section 3350). When the order of the supervisor has become final and the penalty has not been paid, the supervisor may apply to the appropriate superior court for an order directing payment of the civil penalty. The supervisor may also seek from the court an order directing that production from the well or use of the production facility that is the subject of the civil penalty order be discontinued until the violation has been remedied to the satisfaction of the supervisor and the civil penalty has been paid.
(c)Any amount collected under this section shall be deposited in the Oil, Gas, and Geothermal Administrative Fund.
SEC. 3.Article 3.5 (commencing with Section 3180) is added to Chapter 1 of Division 3 of the Public Resources Code, to read:3.5.Natural Gas Storage Wells3180.(a)As used in this article, gas storage well means an active or idle well used primarily to inject natural gas into or withdraw natural gas from an underground natural gas storage facility.
(b)On or before January 1, 2018, the operators of all gas storage wells shall have commenced a mechanical integrity testing regime specified by the division. The testing regime shall include all of the following:
(1)Regular leak testing.
(2)Casing wall thickness inspection.
(3)Pressure test of the production casing.
(4)Any additional testing deemed necessary by the division to demonstrate the integrity of the well.
(c)All anomalies identified in the testing shall be immediately reported to the appropriate district office and explained to the supervisors satisfaction.
(d)(1)The division shall promulgate regulations that establish standards for the design, construction, and maintenance of all gas storage wells to ensure that integrity concerns with a gas storage well are identified and addressed before they can become a threat to life, health, property, the climate, or natural resources.
(2)The regulations shall require that gas storage wells be designed, constructed, and maintained to ensure that a single point of failure does not pose an immediate threat of loss of control of fluids, as determined by the supervisor.
(3)In developing the regulations, the division shall consider enhanced design, construction, and maintenance measures that could meet the standard in paragraph (2), including any of the following:
(A)Primary and secondary mechanical well barriers to isolate the storage gas within the storage reservoir and transfer storage gas from the surface into and out of the storage reservoir.
(B)Production casing to the surface with the required integrity to contain reservoir pressure.
(C)Tubing and packer and production tree with the required integrity to contain reservoir pressure.
(D)Surface controlled subsurface safety valves or Christmas tree valves with the required integrity to contain reservoir pressure that halt flow through the well.
(E)Secondary barrier with overlapping cement casing between two concentric casings with good quality cement bond.
(F)Wellhead with annular valves and seals and the required integrity to contain reservoir pressure.
(G)Casing with a hanger and seal assembly.
(H)Any other well construction requirements the supervisor determines would improve the protection of public health, safety, the environment, and natural resources.
(4)In developing the regulations, the division shall develop a schedule for ongoing mechanical integrity testing.
(e)In order to facilitate consistency, standardization, and training for site inspection and maintenance, to the extent that the regulations promulgated by the division pursuant to subdivision (d) address surface equipment associated with an underground gas storage facility, the division shall ensure that those regulations are consistent with comparable requirements in Parts 190 to 199, inclusive, of Title 49 of the Code of Federal Regulations.
3181.(a)The operator of a gas storage well shall submit for the supervisors approval the following materials:
(1)Data describing the gas storage project and gas storage wells that demonstrate that stored gas will be confined to the approved zone or zones. Updated data shall be provided to the division if conditions change or if more accurate data become available.
(2)A site-specific risk management plan to identify and plan for mitigation of all threats and hazards and potential threats and hazards associated with gas storage well operation in order to ensure internal and external mechanical integrity of a well. The risk management plan shall provide for regular review and revision, as needed, to ensure the plan appropriately reflects current conditions. The operator shall consult with local emergency response entities on the risk management plan. The risk management plan shall include, but is not limited to, all of the following:
(A)A natural gas leak prevention and response program that addresses the full range of natural gas leaks possible at the facility with specific response plans that provide for immediate control of the leak. The prevention and response program shall include, but is not limited to, all of the following:
(i)A protocol for public notice of a large, uncontrollable leak to any community within two miles of the leak if the leak cannot be controlled within 48 hours of discovery by the operator.
(ii)Prepositioning, as feasible, and identification of materials and personnel necessary to respond to leaks. This shall include materials and equipment to respond to and stop the leak itself as well as to protect public health.
(iii)The identification of personnel responsible for notifying regulatory authorities with jurisdiction over the range of leaks possible.
(B)A plan for corrosion monitoring and evaluation.
(C)A schedule for regular well and reservoir integrity assessments.
(D)An assessment of the risks associated with the gas storage well and its operation.
(E)Planned risk mitigation efforts.
(F)A regular maintenance program for the well and the portion of the facility within the divisions jurisdiction. The maintenance program shall include training for site personnel and proactive replacement of equipment at risk of failure to ensure safe operation.
(3)In addition to other factors deemed relevant by the supervisor, the risk management plan required in paragraph (2) shall consider all of the following:
(A)The facilitys distance from dwellings, other buildings intended for human occupancy, or other well-defined outside areas where people may assemble such as campgrounds, recreational areas, or playgrounds.
(B)The risks to and from the well related to roadways, rights of way, railways, airports, and industrial facilities.
(C)Proximity to environmentally or culturally sensitive areas.
(D)The risks of well sabotage.
(E)The current and predicted development of the surrounding area.
(F)Topography and local wind patterns.
(b)All of the materials described in subdivision (a) shall be reported to the division according to a schedule approved by the supervisor. The operator shall not deviate from the programs, plans, and other conditions and protocols contained in the materials without prior written approval by the supervisor.
3182.On a weekly basis, the division shall post a list of notices received pursuant to Section 3203 on the divisions Internet Web site. Copies of any notice shall be provided to members of the public upon request.
3183.(a)The division, in consultation with the State Air Resources Board, shall determine and adopt by regulation what constitutes a reportable leak from a gas storage well and the timeframe for reporting that leak. The regulations shall require an operator to immediately report to the division a leak that poses a significant present or potential hazard to public health and safety, property, or to the environment.
(b)Until the regulations pursuant to subdivision (a) are in effect, a leak of any size from a gas storage well shall be deemed a reportable leak, and the operator shall notify the division immediately.
(c)If a leak from a gas storage well that is reported to the division pursuant to subdivision (a) or (b), as applicable, cannot be controlled within 48 hours, the division shall post information about the leak on its Internet Web site and provide regular updates to the public until the leak is stopped.
3184.(a)Within 72 hours of being notified of a reportable leak, pursuant to Section 3183, the supervisor shall determine if the reportable leak poses a significant present or potential hazard to public health and safety, property, or to the environment such that a relief well is necessary. If the supervisor makes that determination, the operator shall immediately begin preparation for, and commence the drilling of, a relief well.
(b)Nothing in subdivision (a) shall prevent the supervisor from making a determination after the initial 72-hour period that a reportable leak poses a significant hazard to public health and safety, property, or to the environment and that a relief well is necessary. If the supervisor makes that determination, the operator shall immediately begin preparation for, and commence the drilling of, a relief well.
(c)If the operator is required to drill a relief well under subdivision (a) or (b), the operators efforts to drill the relief well shall continue until the reportable leak has been stopped and the cause of the reportable leak has been fully addressed or the supervisor determines that other means of controlling the reportable leak are appropriate.
3185.The division shall perform unannounced random onsite inspections of some gas storage wells annually. The results shall be posted and available to the public on the divisions Internet Web site.
3186.An operator of a gas storage well shall develop and maintain a comprehensive gas storage well training and mentoring program for those employees whose job duties involve the safety of operations and maintenance of gas storage wells and associated equipment. The training program shall include, but is not limited to, gas storage well operations, including best practices to prevent leaks, maintenance and testing, gas storage well safety regulations, emergency response, and incident reporting. If storage field employees are represented by a labor union, the operator shall consult with the relevant union local on safety issues and, when requested, establish a framework to provide training through a joint labor-management training program.
3187.All materials provided to the division and approved by the supervisor to comply with Sections 3181, 3184, and 3185 shall be posted and available to the public on the Internet Web site of the division in a timely manner.
SEC. 4.Section 3403.5 of the Public Resources Code is amended to read:3403.5.(a)The Legislature finds that there are underground storage facilities for gas that utilize depleted or partially depleted oil or gas reservoirs. Purchased gas, usually from out of state, is injected for storage and withdrawn during peak load periods. The supervisor is required to maintain surveillance over these facilities to insure ensure that the original reserves are not lost, that drilling of new wells is conducted properly, and that no damage occurs to the environment by reason of injection and withdrawal of gas.
(b)In order to help support the regulatory effort of the supervisor, there shall be imposed an annual charge computed at a uniform rate based on the number of wells used to inject and withdraw gas from an underground storage facility during the preceding calendar year. The charge shall defray the costs incurred by the state in conducting the activities described in this section. on operators of underground gas storage facilities to defray the regulatory costs incurred by the state in conducting the activities described in subdivision (a). Each underground gas storage facility operator shall pay a proportionate share of the total regulatory costs projected for each fiscal year based on the field capacity and number of wells for each underground gas storage facility. For each underground gas storage facility, the portion owed by the operator shall be computed by multiplying the operators field capacity by the number of the operators wells, and dividing that product by the product of the field capacity of all underground gas storage facilities statewide multiplied by the number of wells for all underground gas storage facilities statewide.
(c)In order to defray the costs of the response effort of the division in the event of a large, uncontrolled release of gas from an underground storage facility that poses a significant present or potential hazard to public health and safety, property, or to the environment, there shall be an additional charge imposed entirely on the operator of the underground storage facility at which the uncontrolled leak or release of gas occurred. The charge shall be in the amount of the total directly associated costs incurred by the division in the previous calendar year in the course of responding to the release, including personnel hours, travel expenses, contracting costs, and any other directly associated costs incurred by the division.
(d)For purposes of this section, the following terms have the following meanings:
(1)Field capacity means the gas storage capacity of an underground gas storage facility, in cubic feet.
(2)Wells means all wells associated with an underground gas storage facility except those that have been plugged and abandoned pursuant to Section 3208 before the preceding calendar year.
SEC. 5.Section 1103 is added to the Public Utilities Code, to read:1103.(a)If a new underground gas storage facility is proposed, the commission shall ensure that a risk assessment evaluating the potential impact of a leak from the facility on public and environmental health, safety, and welfare is conducted by the project proponent. Both acute and chronic exposures from a range of expected emissions and emissions rates shall be evaluated. The evaluation shall include consideration of population density in proximal communities, environmentally sensitive areas, emergency response times, evacuation times, possible leak duration, possible chemical species emitted, and local meteorology.
(b)In evaluating the potential risks and impacts of acute and chronic exposures from emissions from a proposed new gas storage facility, the project proponent shall assess or cause to be assessed risks associated with the proposed facilitys proximity to any living quarters, including private homes, condominiums, apartments, retirement homes, prisons, dormitories, or other housing; education resources, including preschools and schools operating kindergarten or any of grades 1 to 12, inclusive; day care centers; and health care facilities, including hospitals, nursing homes, and long-term care and hospice facilities. Based on the risk analysis, appropriate setbacks to the listed structure types shall be determined by the commission.
(c)The risk assessment conducted pursuant to this section shall be subjected to peer review by independent experts whose demonstrated expertise includes, but is not limited to, the fields of public health, epidemiology, and toxicology.
(d)The findings of any risk assessment required by this section shall be reported to the Legislature in accordance with Section 9795 of the Government Code.
SEC. 6.(a)Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, including subdivisions (e) and (h) of Section 11346.1 of the Government Code, the emergency regulations amending Section 1724.9 of Title 14 of the California Code of Regulations adopted by the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation effective February 5, 2016, shall continue in effect until the adoption, amendment, or repeal of the regulations is promulgated by the division pursuant to Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code.
(b)This section shall remain in effect only until January 1, 2019, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2019, deletes or extends that date.
SEC. 7.This act shall neither impair nor diminish requirements imposed by Chapter 14 of the Statutes of 2016 related to the Aliso Canyon natural gas storage facility located in the County of Los Angeles.
SEC. 18.SEC. 8.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares as follows:
(a)Public transparency regarding risks, the regulations designed to mitigate those risks, and regulatory activity are essential to protect public health and welfare and natural resources.
(b)Public disclosure and safe operation of gas storage wells and associated piping and equipment are essential in order to provide for public, environmental, and occupational health and welfare, including a proactive approach to potential problems.
(c)On October 23, 2015, a significant, uncontrolled leak from a natural gas storage well that was originally drilled over 60 years ago was discovered in the Aliso Canyon natural gas storage facility located in the County of Los Angeles. Initial efforts to stop the leak failed.
(d)The Division of Oil, Gas, and Geothermal Resources in the Department of Conservation responded swiftly to the leak, including by issuing two orders that, among other things, require the use of relief wells. The division worked around the clock overseeing efforts to stop the leak.
(e)It was several days before the community was notified of the leak, although numerous residents started reporting odor concerns almost immediately. The leaking well is up the hill and approximately one and one-quarter miles away from the nearest home. Other natural gas storage wells serving this facility are located closer to homes and businesses.
(f)The operator of the leaking well had removed a subsurface safety valve decades earlier and had not replaced it. Regulations in effect at that time did not require approval or replacement of the valve. There was no automatic downhole shutoff system installed in the event of a leak. In 2014, the operator acknowledged publicly in a filing to the Public Utilities Commission that many of its wells needed additional assessment and repair. There was no requirement to disclose to potential homebuyers and business owners the existence of the Aliso Canyon natural gas storage facility and its attendant risks.
(g)The Governor declared a state of emergency on January 6, 2016, in order to facilitate the ongoing state response and efforts to stop the leak.
(h)On February 18, 2016, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation certified that the Aliso Canyon leak had been stopped. Reports estimate almost 100,000 metric tons of the potent greenhouse gas methane were emitted to the atmosphere. Community health concerns continue postleak with hundreds of complaints reported to the County of Los Angeles along with widespread concern about the short- and long-term impacts of the leak on public health and economic welfare in the area.
(i)The standards for natural gas storage wells need to be improved in order to reflect 21st century technology, disclose and mitigate any risks associated with those wells, recognize that these facilities may be in locations near population centers, and ensure a disaster like the Aliso Canyon leak does not happen again.
SEC. 2.Chapter 6 (commencing with Section 42710) is added to Part 4 of Division 26 of the Health and Safety Code, to read:6.Natural Gas Storage Facility Monitoring42710.(a)The state board, in consultation with any local air district and the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation, shall develop a natural gas storage facility monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks and the presence of natural gas emissions in the atmosphere. The continuous monitoring program may be supplemented by daily leak detection measurements.
(b)The program shall include guidelines for the continuous monitoring which shall include, at minimum, optical gas imaging and accurate quantitative monitoring of natural gas concentrations. The program shall include protocols for both stationary and mobile monitoring, as well as fixed and temporary monitoring locations.
(c)An operator of a natural gas storage facility shall develop and submit to the state board a facility monitoring plan that satisfies program requirements pursuant to subdivision (a). The state board shall review the plan and may approve or disapprove the plan.
(d)Monitoring data shall be provided to the state board. All materials provided to comply with this section shall be posted and available to the public on the Internet Web site of the Division of Oil, Gas, and Geothermal Resources.
SEC. 3.Section 3133 is added to the Public Resources Code, to read:3133.(a)(1)As used in this article, natural gas storage well means an active or idle natural gas storage well serving or located in a natural used solely to inject gas into or withdraw gas from an underground gas storage facility.
(2)(A)For purposes of this section, a low-risk natural gas storage well means a natural gas storage well that meets all of the following:
(i)The well is not subject to Section 3217.
(ii)The well is located in a nonurban area.
(iii)The well meets or exceeds current well construction standards for gas storage wells.
(iv)The well was constructed specifically for natural gas storage and was constructed after January 1, 1997.
(v)The well has a consistent and demonstrated record of mechanical integrity, as determined by the supervisor.
(vi)The well is in compliance with all other applicable requirements imposed by this article and the divisions regulations.
(B)(1)The division may deem any natural gas storage well as ineligible for classification as a low-risk natural gas storage well to protect public safety and natural resources.
(2)If the division exercises the authority provided in paragraph (1), the division shall make a written finding of that decision.
(b)Before January 1, 2018, and annually thereafter, all natural gas storage wells shall be tested across their entire length for a loss of integrity resulting in a leak and the results of the testing shall be reported to the division.
(c)(1)Except as provided in paragraph (2), all natural gas storage wells shall, on or before July 1, 2018, comply with both of the following:
(c)A natural gas storage well shall have
(A)Have an automatic downhole shutoff system, including, but not limited to, surface-controlled subsurface safety valves, deployed in order to limit leaks associated with a loss of the integrity of a well, well casing, or cementing. The shutoff system shall be tested and the results of the test shall be reported to the division no less than semiannually.
(B)Conduct natural gas injection and production through tubing only and be isolated from contact with the well casing.
(2)All low-risk natural gas storage wells shall comply with subparagraphs (A) and (B) of paragraph (1) on or before July 1, 2019.
(d)The division shall review and update practices for the use of subsurface safety valves in natural gas storage wells to reflect the best practices established by independent experts pursuant to Section 3140.
(e)All newly constructed natural gas storage wells shall have a cement barrier, as determined by the supervisor.
(f)(1)The division may modify the requirements of subdivision (c) for low-risk natural gas storage wells to protect public safety and natural resources.
(2)If the division exercises the authority provided in paragraph (1), the division shall make a written finding of that decision.
(g)Nothing in this section shall be construed as limiting the supervisors authority to take action to respond to a hazard.
SEC. 4.Section 3134 is added to the Public Resources Code, to read:3134.A natural gas storage well shall meet all of the following requirements:
(a)(1)Baseline and follow-on proactive evaluations of the integrity of the well, well casing, and cementing across the entire length of the well shall be conducted to thoroughly, quantitatively, and accurately assess their condition. These assessments shall be performed using the best available technology. Based upon these assessments, the risks posed by erosion, corrosion, material deterioration, scaling, cracking, and any other process that may produce natural gas leaks shall be determined.
(2)By January 1, 2018, the division shall develop a schedule for the completion of baseline-proactive baseline proactive evaluations for all natural gas storage wells.
(3)The division shall also develop a schedule for performing follow-on proactive evaluations for all natural gas storage wells in order to measure any changes in well condition after the baseline-proactive baseline proactive evaluations are completed. The schedule shall be determined based upon an assessment of risk. The natural gas storage wells at lowest risk of a loss of integrity shall be reevaluated pursuant to this paragraph at least once every four years and natural gas storage wells at high risk of a loss of integrity shall be reevaluated pursuant to this paragraph at least annually.
(4)A natural gas storage well that has lost integrity or that is at risk of an imminent loss of integrity shall be immediately repaired before returning to service.
(b)Natural gas injection and production shall be through tubing only and isolated from contact with the well casing.
(c)
(b)Annular pressure and production or injection flow rate shall be continuously monitored.
SEC. 5.Section 3135 is added to the Public Resources Code, to read:3135.(a)For the purposes of this section, sensitive receptor includes, but is not limited to, a school, hospital, and residential housing. means any living quarters, including private homes, condominiums, apartments, retirement homes, prisons, dormitories, or other housing; education resources, including preschools and schools operating kindergarten or any of grades 1 to 12, inclusive; daycare centers; and health care facilities, including hospitals, nursing homes, and long-term care and hospice facilities.
(b)The Office of Environmental Health Hazard Assessment and the State Department of Public Health, in consultation with the division, shall perform a science-based risk assessment of natural gas storage wells. The goal of the risk assessment shall be to determine appropriate setback distances for natural gas storage wells from different locations, activities, and receptors. The risk assessment shall include, but is not limited to, all of the following information:
(1)The construction, service history, and operating conditions of a well.
(2)The potential impact of a leak on public and environmental health, safety, and welfare. Both acute and chronic exposures for a range of expected emissions and emissions rates shall be considered.
(3)The factors relevant to determining setback distances including, but not limited to, population density, sensitive receptors, environmentally sensitive areas, emergency response times, evacuation times, leak duration, chemical species emitted, and local meteorology.
(4)The data necessary to determine appropriate setback distances.
(c)The risk assessment conducted pursuant to subdivision (b) shall be subjected to peer review by independent experts.
(d)The findings of the risk assessment required by subdivision (b) shall be reported to the Legislature in accordance with Section 9795 of the Government Code.
(e)Upon completion of the risk assessment required by subdivision (b), the division shall review and, as appropriate, revise its regulations.
SEC. 6.Section 3136 is added to the Public Resources Code, to read:3136.(a)The operator of a natural gas storage well shall submit for the supervisors approval the following materials:
(1)A regular maintenance program for the well and the portion of the facility within the divisions jurisdiction. The maintenance program shall include training for site personnel and proactive replacement of equipment at risk of failure to ensure safe operation.
(2)Design and operating conditions and parameters for the well and the portion of the facility within the divisions jurisdiction.
(3)An inspection, leak detection, and monitoring program for the well and the portion of the facility within the divisions jurisdiction that includes monitoring of natural gas concentrations pursuant to Chapter 6 (commencing with Section 42710) of Part 4 of Division 26 of the Health and Safety Code. Ambient natural gas monitoring sufficient to include monitoring of a new or reworked well shall be in operation before a new well is drilled or a well is reworked.
(4)A site-specific risk management plan to identify and plan for mitigation of all threats and hazards and potential threats and hazards associated with natural gas storage well operation in order to ensure internal and external mechanical integrity of a well. The risk management plan shall provide for regular review and revision, as needed, to ensure the plan appropriately reflects current conditions. The risk management plan shall include, but is not limited to, all of the following:
(A)A natural gas leak prevention and response program that addresses the full range of natural gas leaks possible at the facility with specific response plans that provide for immediate control of the leak. The prevention and response program shall include, but is not limited to, all of the following:
(i)A protocol for public notice of the leak to the community by the operator.
(ii)Prepositioning, as feasible, and identification of materials and personnel necessary to respond to leaks. This shall include materials and equipment to respond to and stop the leak itself as well as to protect public health.
(iii)A training program to ensure site personnel are prepared to respond to a leak, consistent with the requirements of Section 3144.
(B)A plan for corrosion monitoring and evaluation.
(C)A schedule for regular well and reservoir integrity assessments.
(D)An assessment of the risks associated with the natural gas storage well and its operation.
(E)Planned risk mitigation efforts.
(b)All of the materials described in subdivision (a) shall be approved by the supervisor, at his or her discretion, and in the possession of the division before the supervisor or district deputy approves a notice required pursuant to Section 3203.
(c)All of the materials described in subdivision (a) shall be reported to the division annually. The operator shall not deviate from the programs, plans, and other conditions and protocols contained in the materials without prior written approval by the supervisor.
SEC. 7.Section 3137 is added to the Public Resources Code, to read:3137.The public has a right to review the location of a natural gas storage well or conversion of an existing well to a natural gas storage well before the approval of any notice required pursuant to Section 3203.
SEC. 8.Section 3138 is added to the Public Resources Code, to read:3138.In the event of a loss of the integrity of a natural gas storage well, well casing, or cementing resulting in a large ongoing leak of natural gas and associated gases and materials that pose a significant present or potential hazard to public health and safety, property, or to the environment, preparations for the drilling of a relief well shall begin within 24 hours of the discovery of the leak regardless of any other activities undertaken to stop the leak.
SEC. 9.Section 3139 is added to the Public Resources Code, to read:3139.In the event of a leak of any size from a natural gas storage well, the operator shall notify the division immediately. Within 24 hours of notification, the division shall post information about the leak on its Internet Web site and provide regular updates to the public until the leak is stopped.
SEC. 10.Section 3140 is added to the Public Resources Code, to read:3140.(a)The division shall convene an independent panel of recognized experts to develop best practices for natural gas storage facilities. The panel shall consider at least all of the following:
(1)The proximity of a natural gas storage facility and wells to populations of people.
(2)The conditions at which a well should be plugged and abandoned, and what standards the plugging and abandonment should meet.
(3)The range of proactive methods to assess the integrity of a well, well casing, and cementing, and identifying the best available technology for these assessments.
(4)A thorough analysis of the risks associated with the conversion of a well for use as a natural gas storage well.
(5)Natural gas storage well design, operating, maintenance, and monitoring standards, including, but not limited to, placement of observation wells, soil monitoring, training, and well monitoring after plugging and abandonment.
(6)Risk assessment and management tools for all threats and hazards and potential threats and hazards associated with natural gas storage wells, including identifying data requirements for those tools, with the goal of providing for a standardized and comparable approach to evaluate natural gas storage wells statewide.
(7)Automatic shutoff systems including the location and placement of subsurface and surface safety valves, shutoff control systems, reliability, and appropriate use.
(b)Upon completion of the panels work pursuant to subdivision (a), the division shall review and incorporate best practices developed by the panel into its regulations for natural gas storage wells, if appropriate, and, to the extent those practices are applicable, for other wells under the divisions jurisdiction.
(c)The division shall periodically, and whenever necessary, review advances in relevant technologies and best practices for natural gas storage facilities and, if appropriate, shall incorporate changes in best practices into its regulations for natural gas storage wells and, to the extent those practices are applicable, for other wells under the divisions jurisdiction.
SEC. 11.Section 3141 is added to the Public Resources Code, to read:3141.In order to facilitate consistency, standardization, and training, the division shall, as feasible, incorporate federal regulations applicable to natural gas storage facilities, including, but not limited to, Parts 190 to 199, inclusive, of Title 49 of the Code of Federal Regulations into the divisions natural gas storage well regulations.
SEC. 12.Section 3142 is added to the Public Resources Code, to read:3142.To ensure that the division has all the records it needs to evaluate natural gas storage wells, the well history maintained pursuant to Section 3213 shall include all operations, injection, production, and emplacement of any materials into the well. The operator shall disclose the well history to the division for each operation, injection, production, and emplacement of any material into the well.
SEC. 13.Section 3143 is added to the Public Resources Code, to read:3143.The division shall perform unannounced random on-site onsite inspections of some natural gas storage wells annually. The results shall be posted and available to the public on the divisions Internet Web site.
SEC. 14.Section 3144 is added to the Public Resources Code, to read:3144.An operator of a natural gas storage well shall develop and maintain a comprehensive gas storage well training and mentoring program for those employees whose job duties involve the safety of operations and maintenance of natural gas storage wells and associated equipment. The training program shall include, but is not limited to, gas storage well operations, including best practices to prevent leaks, maintenance and testing, gas storage well safety regulations, emergency response, and incident reporting. If employees are represented by a labor union, the operator shall consult with the union on safety issues and, when requested, establish a framework to provide training through a joint labor-management training program.
SEC. 15.Section 3145 is added to the Public Resources Code, to read:3145.All materials provided to the division to comply with Section 3133 to 3143, inclusive, shall be posted and available to the public on the Internet Web site of the division.
SEC. 16.Section 3146 is added to the Public Resources Code, to read:3146.A member of the public may bring suit for writ of mandate against the division for failure to enforce Sections 3133 to 3145, inclusive.
SEC. 17.Section 3236.5 of the Public Resources Code is amended to read:3236.5.(a)A person who violates this chapter or a regulation implementing this chapter is subject to a civil penalty not to exceed twenty-five thousand dollars ($25,000) for each violation. A person who commits a violation of Article 3 (commencing with Section 3150) or Section 3300 is subject to a civil penalty of not less than ten thousand dollars ($10,000) and not to exceed twenty-five thousand dollars ($25,000) per day per violation. An act of God and an act of vandalism beyond the reasonable control of the operator shall not be considered a violation. The civil penalty shall be imposed by an order of the supervisor pursuant to Section 3225 upon a determination that a violation has been committed by the person charged. The imposition of a civil penalty under this section shall be in addition to any other penalty provided by law for the violation. When establishing the amount of the civil penalty pursuant to this section, the supervisor shall consider, in addition to other relevant circumstances, all of the following:
(1)The extent of harm caused by the violation.
(2)The persistence of the violation.
(3)The pervasiveness of the violation.
(4)The number of prior violations by the same violator.
(b)An order of the supervisor imposing a civil penalty shall be reviewable pursuant to Article 6 (commencing with Section 3350). When the order of the supervisor has become final and the penalty has not been paid, the supervisor may apply to the appropriate superior court for an order directing payment of the civil penalty. The supervisor may also seek from the court an order directing that production from the well or use of the production facility that is the subject of the civil penalty order be discontinued until the violation has been remedied to the satisfaction of the supervisor and the civil penalty has been paid.
(c)Any amount collected under this section shall be deposited in the Oil, Gas, and Geothermal Administrative Fund.
SEC. 18.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares as follows:
(a)Public transparency regarding risks, the regulations designed to mitigate those risks, and regulatory activity are essential to protect public health and welfare and natural resources is essential. resources.
(b)Safe Public disclosure and safe operation of gas storage wells and associated piping and equipment is are essential in order to provide for public, environmental, and occupational health and welfare, and includes including a proactive approach to potential problems.
(c)On October 23, 2015, a significant, uncontrolled leak from a natural gas storage well that was originally drilled over 60 years ago was discovered in the Aliso Canyon natural gas storage facility located in the County of Los Angeles. Initial efforts to stop the leak failed.
(d)The Division of Oil, Gas, and Geothermal Resources in the Department of Conservation responded swiftly to the leak, including by issuing two orders that, among other things, require the use of relief wells. The division worked around the clock overseeing efforts to stop the leak.
(e)It was several days before the community was notified of the leak, although numerous residents started reporting odor concerns almost immediately. The leaking well is up the hill and approximately one and one-quarter miles away from the nearest home. Other natural gas storage wells serving this facility are located closer to homes. homes and businesses.
(f)The operator of the leaking well had removed a subsurface safety valve decades earlier and had not replaced it. Regulations in effect at that time did not require approval or replacement of the valve. There was no automatic downhole shutoff system installed in the event of a leak. In 2014, the operator acknowledged publicly in a filing to the Public Utilities Commission that many of its wells needed additional assessment and repair. There was no requirement to disclose to potential homebuyers and business owners the existence of the Aliso Canyon natural gas storage facility and its attendant risks.
(f)
(g)The Governor declared a state of emergency on January 6, 2016, in order to facilitate the ongoing state response and efforts to stop the leak.
(g)
(h)On February 18, 2016, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation certified that the Aliso Canyon leak had been stopped. Reports estimate almost 100,000 metric tons of the potent greenhouse gas methane was were emitted to the atmosphere. Community health concerns continue postleak with over 150 hundreds of complaints reported to the County of Los Angeles. Angeles along with widespread concern about the short- and long-term impacts of the leak on public health and economic welfare in the area.
(h)
(i)The standards for natural gas storage wells need to be improved in order to reflect 21st century technology, disclose and mitigate any risks associated with those wells, recognize that these facilities may be in locations near population centers, and ensure a disaster like the Aliso Canyon leak does not happen again.
SEC. 2.Chapter 6 (commencing with Section 42710) is added to Part 4 of Division 26 of the Health and Safety Code, to read:6.Natural Gas Storage Facility Monitoring42710.(a)The state board, in consultation with any local air district and the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation, shall develop a natural gas storage facility monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks and the presence of natural gas emissions in the atmosphere. The continuous monitoring program may be supplemented by daily leak detection measurements.
(b)The program shall include guidelines for the continuous monitoring which shall include, at minimum, optical gas imaging and accurate quantitative monitoring of natural gas concentrations. The program shall include protocols for both stationary and mobile monitoring, as well as fixed and temporary monitoring locations.
(c)An operator of a natural gas storage facility shall develop and submit to the state board a facility monitoring plan that satisfies program requirements pursuant to subdivision (a). The state board shall review the plan and may approve or disapprove the plan.
(d)Monitoring data shall be provided to the state board. All materials provided to comply with this section shall be posted and available to the public on the Internet Web site of the Division of Oil, Gas, and Geothermal Resources.
SEC. 3.Section 3133 is added to the Public Resources Code, to read:3133.(a)As used in this article, natural gas storage well means an active or idle natural gas storage well serving or located in a natural gas storage facility.
(b)Before January 1, 2018, and annually thereafter, the division shall inspect all natural gas storage wells. wells shall be tested across their entire length for a loss of integrity resulting in a leak and the results of the testing shall be reported to the division.
(c)A natural gas storage well in existence on December 31, 2016, shall be brought into compliance with this article by ____. The use of a natural gas storage well older than ____ shall be phased out by ____.
(c)A natural gas storage well shall have an automatic downhole shutoff system, including, but not limited to, surface-controlled subsurface safety valves, deployed in order to limit leaks associated with a loss of the integrity of a well, well casing, or cementing. The shutoff system shall be tested and the results of the test shall be reported to the division no less than semiannually.
(d)The division shall review and update practices for the use of subsurface safety valves in natural gas storage wells to reflect the best practices established by independent experts pursuant to Section 3140.
SEC. 4.Section 3134 is added to the Public Resources Code, to read:3134.A natural gas storage well shall meet all of the following standards: requirements:
(a)The well shall have an automatic downhole shutoff system, including, but not limited to, surface-controlled subsurface safety valves, deployed in order to limit leaks associated with a loss of the integrity of a well, well casing, or cementing. The shutoff system shall be tested and the results of the test shall be reported to the division no less than annually.
(b)Proactive evaluation
(a)(1)Baseline and follow-on proactive evaluations of the integrity of the well, well casing, and cementing across the entire length of the well shall be conducted to thoroughly, quantitatively, and accurately assess their condition. These assessments shall be performed using the best available technology. Based upon these assessments, the risks posed by erosion, corrosion, aging, material deterioration, scaling, cracking, and any other process that may produce natural gas leaks shall be determined. A
(2)By January 1, 2018, the division shall develop a schedule for the completion of baseline-proactive evaluations for all natural gas storage wells.
(3)The division shall also develop a schedule for performing follow-on proactive evaluations for all natural gas storage wells in order to measure any changes in well condition after the baseline-proactive evaluations are completed. The schedule shall be determined based upon an assessment of risk. The natural gas storage wells at lowest risk of a loss of integrity shall be reevaluated pursuant to this paragraph at least once every four years and natural gas storage wells at high risk of a loss of integrity shall be reevaluated pursuant to this paragraph at least annually.
(4)A natural gas storage well that has lost integrity or that is at risk of an imminent loss of integrity shall be immediately repaired before returning to service. A natural gas storage well at high risk of a loss of integrity shall be evaluated pursuant to the measures in this subdivision at least annually.
(c)
(b)Natural gas injection and production shall be through tubing only and isolated from contact with the well casing.
(d)
(c)Annular pressure and production or injection flow rate shall be continuously monitored.
SEC. 5.Section 3135 is added to the Public Resources Code, to read:3135.(a)For the purposes of this section, sensitive receptor includes, but is not limited to, a school, hospital, and residential housing.
(b)In addition to the requirements of Section 3134, a natural gas storage well that is within 10,000 feet of a sensitive receptor shall meet both of the following requirements:
(1)Have continuous monitoring of natural gas concentrations to identify natural gas leaks at the wellhead.
(2)Be evaluated pursuant to the measures in subdivision (b) of Section 3134 at least annually.
(c)The division shall not issue a permit for a new natural gas storage well located within ____ feet of a sensitive receptor, and the division shall order operators to cease the use of, and plug and abandon, an existing natural gas storage well within _____ feet of a sensitive receptor by ____.
(b)The Office of Environmental Health Hazard Assessment and the State Department of Public Health, in consultation with the division, shall perform a science-based risk assessment of natural gas storage wells. The goal of the risk assessment shall be to determine appropriate setback distances for natural gas storage wells from different locations, activities, and receptors. The risk assessment shall include, but is not limited to, all of the following information:
(1)The construction, service history, and operating conditions of a well.
(2)The potential impact of a leak on public and environmental health, safety, and welfare. Both acute and chronic exposures for a range of expected emissions and emissions rates shall be considered.
(3)The factors relevant to determining setback distances including, but not limited to, population density, sensitive receptors, environmentally sensitive areas, emergency response times, evacuation times, leak duration, chemical species emitted, and local meteorology.
(4)The data necessary to determine appropriate setback distances.
(c)The risk assessment conducted pursuant to subdivision (b) shall be subjected to peer review by independent experts.
(d)The findings of the risk assessment required by subdivision (b) shall be reported to the Legislature in accordance with Section 9795 of the Government Code.
(e)Upon completion of the risk assessment required by subdivision (b), the division shall review and, as appropriate, revise its regulations.
SEC. 6.Section 3136 is added to the Public Resources Code, to read:3136.(a)The operator of a natural gas storage well shall submit for the supervisors approval the following materials:
(1)A regular maintenance program for the well and the portion of the facility within the divisions jurisdiction. The maintenance program shall include training for site personnel and proactive replacement of equipment at risk of failure to ensure safe operation.
(2)Design and operating conditions and parameters for the well and the portion of the facility within the divisions jurisdiction.
(3)An inspection, leak detection, and monitoring program for the well and the portion of the facility within the divisions jurisdiction that includes monitoring of natural gas concentrations pursuant to Chapter 6 (commencing with Section 42710) of Part 4 of Division 26 of the Health and Safety Code. Ambient natural gas monitoring sufficient to include monitoring of a new or reworked well shall be in operation before a new well is drilled or a well is reworked.
(4)A site-specific risk management plan to identify and plan for mitigation of all threats and hazards and potential threats and hazards associated with natural gas storage well operation. operation in order to ensure internal and external mechanical integrity of a well. The risk management plan shall provide for regular review and revision, as needed, to ensure the plan appropriately reflects current conditions. The risk management plan shall include, but is not limited to, all of the following:
(A)A natural gas leak prevention and response program that addresses the full range of natural gas leaks possible at the facility with specific response plans that provide for immediate control of the leak. The prevention and response program shall include, but is not limited to, all of the following:
(i)A protocol for public notice of the leak to the community by the operator.
(ii)Prepositioning Prepositioning, as feasible, and identification of materials and personnel necessary to respond to leaks. This shall include materials, including equipment to capture leaked gas, materials and equipment to respond to and stop the leak itself as well as to protect public health.
(iii)A training program to ensure site personnel are prepared to respond to a leak. leak, consistent with the requirements of Section 3144.
(B)A plan for corrosion monitoring and evaluation.
(C)A schedule for regular well and reservoir integrity assessments.
(D)An assessment of the risks associated with the natural gas storage well and its operation.
(E)Planned risk mitigation efforts.
(b)All of the materials described in subdivision (a) shall be approved by the supervisor, at his or her discretion, and in the possession of the division before the supervisor or district deputy approves a notice required pursuant to Section 3203.
(c)All of the materials described in subdivision (a) shall be reported to the division annually. The operator shall not deviate from the programs, plans, and other conditions and protocols contained in the materials without prior written approval by the supervisor.
SEC. 7.Section 3137 is added to the Public Resources Code, to read:3137.The public has a right to review the location of a natural gas storage well or conversion of an existing well to a natural gas storage well before the approval of any notice required pursuant to Section 3203.
SEC. 8.Section 3138 is added to the Public Resources Code, to read:3138.In the event of a loss of the integrity of a natural gas storage well, well casing, or cementing resulting in a significant, uncontrolled large ongoing leak of natural gas, gas and associated gases and materials that pose a significant present or potential hazard to public health and safety, property, or to the environment, preparations for the drilling of a relief well shall begin within 24 hours of the discovery of the leak regardless of any other activities undertaken to stop the leak.
SEC. 9.Section 3139 is added to the Public Resources Code, to read:3139.In the event of a leak of any size from a natural gas storage well, the operator shall notify the division immediately. Within 24 hours of notification, the division shall post information about the leak on its Internet Web site and provide regular updates to the public until the leak is stopped.
SEC. 10.Section 3140 is added to the Public Resources Code, to read:3140.(a)The division shall convene an independent panel of recognized experts to develop best practices for natural gas storage facilities. The panel shall consider at least all of the following:
(1)The proximity of a natural gas storage facility and wells to populations of people.
(2)The age or condition conditions at which a well should be plugged and abandoned, and what standards the plugging and abandonment should meet.
(3)The range of proactive methods to assess the integrity of a well, well casing, and cementing, and identifying the best available technology for these assessments.
(4)A thorough analysis of the risks associated with the conversion of a well for use as a natural gas storage well.
(5)Natural gas storage well design, operating, maintenance, and monitoring standards. standards, including, but not limited to, placement of observation wells, soil monitoring, training, and well monitoring after plugging and abandonment.
(6)Risk assessment and management tools for all threats and hazards and potential threats and hazards associated with natural gas storage wells, including identifying data requirements for those tools, with the goal of providing for a standardized and comparable approach to evaluate natural gas storage wells statewide.
(7)Automatic shutoff systems including the location and placement of subsurface and surface safety valves, shutoff control systems, reliability, and appropriate use.
(b)Upon completion of the panels work pursuant to subdivision (a), the division shall review and incorporate best practices developed by the panel into its regulations for natural gas storage wells, if appropriate, and, to the extent those practices are applicable, for other wells under the divisions jurisdiction.
(c)The division shall periodically, and whenever necessary, review advances in relevant technologies and best practices for natural gas storage facilities and, if appropriate, shall incorporate changes in best practices into its regulations for natural gas storage wells and, to the extent those practices are applicable, for other wells under the divisions jurisdiction.
SEC. 11.Section 3141 is added to the Public Resources Code, to read:3141.(a)The division, in consultation with the Office of Environmental Health Hazard Assessment, the State Department of Public Health, and the Department of Industrial Relations, shall perform a risk assessment of natural gas storage wells. The risk assessment shall include, but is not limited to, all of the following information:
(1)The age and construction of a well.
(2)The service history and operating conditions of the well.
(3)The potential impact of a leak on public, occupational, and environmental health, safety, and welfare.
(b)The risk assessment shall be subjected to peer review by independent experts.
(c)The findings of the risk assessment shall be reported to the Legislature in accordance with Section 9795 of the Government Code.
3141.In order to facilitate consistency, standardization, and training, the division shall, as feasible, incorporate federal regulations applicable to natural gas storage facilities, including, but not limited to, Parts 190 to 199, inclusive, of Title 49 of the Code of Federal Regulations into the divisions natural gas storage well regulations.
SEC. 12.Section 3142 is added to the Public Resources Code, to read:3142.To ensure that the division has all the records it needs to evaluate natural gas storage wells, the well history maintained pursuant to Section 3213 shall include all operations, injection, production, and emplacement of any materials into the well. The operator shall disclose the well history to the division for each operation, injection, production, and emplacement of any material into the well.
SEC. 13.Section 3143 is added to the Public Resources Code, to read:3143.The division shall perform unannounced random on-site inspections of some natural gas storage wells annually. The results shall be posted and available to the public on the divisions Internet Web site.
SEC. 14.Section 3144 is added to the Public Resources Code, to read:3144.An operator of a natural gas storage well shall develop and maintain a comprehensive gas storage well training and mentoring program for those employees whose job duties involve the safety of operations and maintenance of natural gas storage wells and associated equipment. The training program shall include, but is not limited to, gas storage well operations, including best practices to prevent leaks, maintenance and testing, gas storage well safety regulations, emergency response, and incident reporting. If employees are represented by a labor union, the operator shall consult with the union on safety issues and, when requested, establish a framework to provide training through a joint labor-management training program.
SEC. 13.SEC. 15.Section 3143 3145 is added to the Public Resources Code, to read:3143.3145.All materials provided to the division to comply with Section 3133 to 3142, 3143, inclusive, shall be posted and available to the public on the Internet Web site of the division.
SEC. 14.SEC. 16.Section 3144 3146 is added to the Public Resources Code, to read:3144.3146.A member of the public may bring suit for writ of mandate against the division for failure to enforce Sections 3133 to 3143, 3145, inclusive.
SEC. 15.SEC. 17.Section 3236.5 of the Public Resources Code is amended to read:3236.5.(a)A person who violates this chapter or a regulation implementing this chapter is subject to a civil penalty not to exceed twenty-five thousand dollars ($25,000) for each violation. A person who commits a violation of Article 3 (commencing with Section 3150) or Section 3300 is subject to a civil penalty of not less than ten thousand dollars ($10,000) and not to exceed twenty-five thousand dollars ($25,000) per day per violation. An act of God and an act of vandalism beyond the reasonable control of the operator shall not be considered a violation. The civil penalty shall be imposed by an order of the supervisor pursuant to Section 3225 upon a determination that a violation has been committed by the person charged. The imposition of a civil penalty under this section shall be in addition to any other penalty provided by law for the violation. When establishing the amount of the civil penalty pursuant to this section, the supervisor shall consider, in addition to other relevant circumstances, all of the following:
(1)The extent of harm caused by the violation.
(2)The persistence of the violation.
(3)The pervasiveness of the violation.
(4)The number of prior violations by the same violator.
(b)An order of the supervisor imposing a civil penalty shall be reviewable pursuant to Article 6 (commencing with Section 3350). When the order of the supervisor has become final and the penalty has not been paid, the supervisor may apply to the appropriate superior court for an order directing payment of the civil penalty. The supervisor may also seek from the court an order directing that production from the well or use of the production facility that is the subject of the civil penalty order be discontinued until the violation has been remedied to the satisfaction of the supervisor and the civil penalty has been paid.
(c)Any amount collected under this section shall be deposited in the Oil, Gas, and Geothermal Administrative Fund.
SEC. 16.SEC. 18.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares as follows:
(a)Public transparency regarding regulations and regulatory activity to protect public health and welfare and natural resources is essential.
(b)Safe operation of gas storage wells and associated piping and equipment is essential in order to provide for public, environmental, and occupational health and welfare, and includes a proactive approach to potential problems.
(c)On October 23, 2015, a significant, uncontrolled leak from a natural gas storage well that was originally drilled over 60 years ago was discovered in the Aliso Canyon natural gas storage facility located in the County of Los Angeles. Initial efforts to stop the leak failed.
(d)The Division of Oil, Gas, and Geothermal Resources in the Department of Conservation responded swiftly to the leak, including by issuing two orders that, among other things, require the use of relief wells. The division worked around the clock overseeing efforts to stop the leak.
(e)It was several days before the community was notified of the leak, although numerous residents started reporting odor concerns almost immediately. The leaking well is up the hill and approximately one and one-quarter miles away from the nearest home. Other natural gas storage wells serving this facility are located closer to homes.
(f)The Governor declared a state of emergency on January 6, 2016, in order to facilitate the ongoing state response and efforts to stop the leak.
(g)On February 18, 2016, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation certified that the Aliso Canyon leak had been stopped. Reports estimate almost 100,000 metric tons of the potent greenhouse gas methane was emitted to the atmosphere. Community health concerns continue postleak with over 150 complaints reported to the County of Los Angeles.
(h)The standards for natural gas storage wells need to be improved in order to reflect 21st century technology, recognize that these facilities may be in locations near population centers, and ensure a disaster like the Aliso Canyon leak does not happen again.
SEC. 2.Chapter 6 (commencing with Section 42710) is added to Part 4 of Division 26 of the Health and Safety Code, to read:6.Natural Gas Storage Facility Monitoring42710.(a)The state board, in consultation with any local air district and the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation, shall develop a natural gas storage facility monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks and the presence of natural gas emissions in the atmosphere. The continuous monitoring program may be supplemented by daily leak detection measurements.
(b)The program shall include guidelines for the continuous monitoring which shall include, at minimum, optical gas imaging and accurate quantitative monitoring of natural gas concentrations. The program shall include protocols for both stationary and mobile monitoring, as well as fixed and temporary monitoring locations.
(c)An operator of a natural gas storage facility shall develop and submit to the state board a facility monitoring plan that satisfies program requirements pursuant to subdivision (a). The state board shall review the plan and may approve or disapprove the plan.
(d)Monitoring data shall be provided to the state board. All materials provided to comply with this section shall be posted and available to the public on the Internet Web site of the Division of Oil, Gas, and Geothermal Resources.
SEC. 3.Section 3133 is added to the Public Resources Code, to read:3133.(a)As used in this article, natural gas storage well means an active or idle natural gas storage well serving or located in a natural gas storage facility.
(b)Before January 1, 2018, and annually thereafter, the division shall inspect all natural gas storage wells.
(c)A natural gas storage well in existence on December 31, 2016, shall be brought into compliance with this article by ____. The use of a natural gas storage well older than ____ shall be phased out by ____.
SEC. 4.Section 3134 is added to the Public Resources Code, to read:3134.A natural gas storage well shall meet all of the following standards:
(a)The well shall have an automatic downhole shutoff system, including, but not limited to, surface-controlled subsurface safety valves, deployed in order to limit leaks associated with a loss of the integrity of a well, well casing, or cementing. The shutoff system shall be tested and the results of the test shall be reported to the division no less than annually.
(b)Proactive evaluation of the integrity of the well, well casing, and cementing across the entire length of the well shall be conducted to thoroughly, quantitatively, and accurately assess their condition. These assessments shall be performed using the best available technology. Based upon these assessments, the risks posed by erosion, corrosion, aging, scaling, cracking, and any other process that may produce natural gas leaks shall be determined. A natural gas storage well that has lost integrity or that is at risk of an imminent loss of integrity shall be immediately repaired before returning to service. A natural gas storage well at high risk of a loss of integrity shall be evaluated pursuant to the measures in this subdivision at least annually.
(c)Natural gas injection and production shall be through tubing only and isolated from contact with the well casing.
(d)Annular pressure and production or injection flow rate shall be continuously monitored.
SEC. 5.Section 3135 is added to the Public Resources Code, to read:3135.(a)For the purposes of this section, sensitive receptor includes, but is not limited to, a school, hospital, and residential housing.
(b)In addition to the requirements of Section 3134, a natural gas storage well that is within 10,000 feet of a sensitive receptor shall meet both of the following requirements:
(1)Have continuous monitoring of natural gas concentrations to identify natural gas leaks at the wellhead.
(2)Be evaluated pursuant to the measures in subdivision (b) of Section 3134 at least annually.
(c)The division shall not issue a permit for a new natural gas storage well located within ____ feet of a sensitive receptor, and the division shall order operators to cease the use of, and plug and abandon, an existing natural gas storage well within _____ feet of a sensitive receptor by ____.
SEC. 6.Section 3136 is added to the Public Resources Code, to read:3136.(a)The operator of a natural gas storage well shall submit for the supervisors approval the following materials:
(1)A regular maintenance program for the well and the portion of the facility within the divisions jurisdiction. The maintenance program shall include training for site personnel and proactive replacement of equipment at risk of failure to ensure safe operation.
(2)Design and operating conditions and parameters for the well and the portion of the facility within the divisions jurisdiction.
(3)An inspection, leak detection, and monitoring program for the well and the portion of the facility within the divisions jurisdiction that includes monitoring of natural gas concentrations pursuant to Chapter 6 (commencing with Section 42710) of Part 4 of Division 26 of the Health and Safety Code. Ambient natural gas monitoring sufficient to include monitoring of a new or reworked well shall be in operation before a new well is drilled or a well is reworked.
(4)A site-specific risk management plan to identify and plan for mitigation of all hazards and potential hazards associated with natural gas storage well operation. The risk management plan shall provide for regular review and revision, as needed, to ensure the plan appropriately reflects current conditions. The risk management plan shall include, but is not limited to, all of the following:
(A)A natural gas leak prevention and response program that addresses the full range of natural gas leaks possible at the facility with specific response plans that provide for immediate control of the leak. The prevention and response program shall include, but is not limited to, all of the following:
(i)A protocol for public notice of the leak to the community by the operator.
(ii)Prepositioning and identification of materials and personnel necessary to respond to leaks. This shall include materials, including equipment to capture leaked gas, to respond to the leak itself as well as to protect public health.
(iii)A training program to ensure site personnel are prepared to respond to a leak.
(B)A plan for corrosion monitoring and evaluation.
(C)A schedule for regular well and reservoir integrity assessments.
(D)An assessment of the risks associated with the natural gas storage well and its operation.
(E)Planned risk mitigation efforts.
(b)All of the materials described in subdivision (a) shall be approved by the supervisor, at his or her discretion, and in the possession of the division before the supervisor or district deputy approves a notice required pursuant to Section 3203.
(c)All of the materials described in subdivision (a) shall be reported to the division annually. The operator shall not deviate from the programs, plans, and other conditions and protocols contained in the materials without prior written approval by the supervisor.
SEC. 7.Section 3137 is added to the Public Resources Code, to read:3137.The public has a right to review the location of a natural gas storage well or conversion of an existing well to a natural gas storage well before the approval of any notice required pursuant to Section 3203.
SEC. 8.Section 3138 is added to the Public Resources Code, to read:3138.In the event of a loss of the integrity of a natural gas storage well, well casing, or cementing resulting in a significant, uncontrolled leak of natural gas, preparations for the drilling of a relief well shall begin within 24 hours of the discovery of the leak regardless of any other activities undertaken to stop the leak.
SEC. 9.Section 3139 is added to the Public Resources Code, to read:3139.In the event of a leak of any size from a natural gas storage well, the operator shall notify the division immediately. Within 24 hours of notification, the division shall post information about the leak on its Internet Web site and provide regular updates to the public until the leak is stopped.
SEC. 10.Section 3140 is added to the Public Resources Code, to read:3140.(a)The division shall convene an independent panel of recognized experts to develop best practices for natural gas storage facilities. The panel shall consider at least all of the following:
(1)The proximity of a natural gas storage facility and wells to populations of people.
(2)The age or condition at which a well should be plugged and abandoned, and what standards the plugging and abandonment should meet.
(3)The range of proactive methods to assess the integrity of a well, well casing, and cementing, and identifying the best available technology for these assessments.
(4)A thorough analysis of the risks associated with the conversion of a well for use as a natural gas storage well.
(5)Natural gas storage well operating, maintenance, and monitoring standards.
(b)Upon completion of the panels work pursuant to subdivision (a), the division shall review and incorporate best practices developed by the panel into its regulations for natural gas storage wells, as if appropriate, and and, to the extent those practices are applicable, for other wells under the divisions jurisdiction, as applicable. jurisdiction.
(c)The division shall periodically, and whenever necessary, review advances in relevant technologies and best practices for natural gas storage facilities and, if appropriate, shall incorporate changes in best practices into its regulations for natural gas storage wells and, to the extent those practices are applicable, for other wells under the divisions jurisdiction.
SEC. 11.Section 3141 is added to the Public Resources Code, to read:3141.(a)The division, in consultation with the Office of Environmental Health Hazard Assessment, the State Department of Public Health, and the Department of Industrial Relations, shall perform a risk assessment of natural gas storage wells. The risk assessment shall include, but is not limited to, all of the following information:
(1)The age and construction of a well.
(2)The service history and operating conditions of the well.
(3)The potential impact of a leak on public, occupational, and environmental health, safety, and welfare.
(b)The risk assessment shall be subjected to peer review by independent experts.
(c)The findings of the risk assessment shall be reported to the Legislature in accordance with Section 9795 of the Government Code.
SEC. 12.Section 3142 is added to the Public Resources Code, to read:3142.To ensure that the division has all the records it needs to evaluate natural gas storage wells, the well history maintained pursuant to Section 3213 shall include all operations, injection, production, and emplacement of any materials into the well. The operator shall disclose the well history to the division for each operation, injection, production, and emplacement of any material into the well.
SEC. 13.Section 3143 is added to the Public Resources Code, to read:3143.All materials provided to the division to comply with Section 3133 to 3142, inclusive, shall be posted and available to the public on the Internet Web site of the division.
SEC. 14.Section 3144 is added to the Public Resources Code, to read:3144.A member of the public may bring suit for writ of mandate against the division for failure to enforce Sections 3133 to 3143, inclusive.
SEC. 15.Section 3236.5 of the Public Resources Code is amended to read:3236.5.(a)A person who violates this chapter or a regulation implementing this chapter is subject to a civil penalty not to exceed twenty-five thousand dollars ($25,000) for each violation. A person who commits a violation of Article 3 (commencing with Section 3150) or Section 3300 is subject to a civil penalty of not less than ten thousand dollars ($10,000) and not to exceed twenty-five thousand dollars ($25,000) per day per violation. An act of God and an act of vandalism beyond the reasonable control of the operator shall not be considered a violation. The civil penalty shall be imposed by an order of the supervisor pursuant to Section 3225 upon a determination that a violation has been committed by the person charged. The imposition of a civil penalty under this section shall be in addition to any other penalty provided by law for the violation. When establishing the amount of the civil penalty pursuant to this section, the supervisor shall consider, in addition to other relevant circumstances, all of the following:
(1)The extent of harm caused by the violation.
(2)The persistence of the violation.
(3)The pervasiveness of the violation.
(4)The number of prior violations by the same violator.
(b)An order of the supervisor imposing a civil penalty shall be reviewable pursuant to Article 6 (commencing with Section 3350). When the order of the supervisor has become final and the penalty has not been paid, the supervisor may apply to the appropriate superior court for an order directing payment of the civil penalty. The supervisor may also seek from the court an order directing that production from the well or use of the production facility that is the subject of the civil penalty order be discontinued until the violation has been remedied to the satisfaction of the supervisor and the civil penalty has been paid.
(c)Any amount collected under this section shall be deposited in the Oil, Gas, and Geothermal Administrative Fund.
SEC. 16.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares as follows:
(a)Public transparency regarding regulations and regulatory activity to protect public health and welfare and natural resources is essential.
(b)Safe operation of gas storage wells and associated piping and equipment is essential in order to provide for public, environmental, and occupational health and welfare, and includes a proactive approach to potential problems.
(b)
(c)On October 23, 2015, a significant, uncontrolled leak from a natural gas storage well that was originally drilled over 60 years ago was discovered in the Aliso Canyon natural gas storage facility located in the County of Los Angeles. Initial efforts to stop the leak failed.
(c)
(d)The Division of Oil, Gas, and Geothermal Resources in the Department of Conservation responded swiftly to the leak, including by issuing two orders that, among other things, require the use of relief wells. The division has been working worked around the clock overseeing efforts to stop the leak.
(d)
(e)It was several days before the community was notified of the leak, although numerous residents started reporting odor concerns almost immediately. The leaking well is up the hill and approximately one and one-quarter miles away from the nearest home. Other natural gas storage wells serving this facility are located closer to homes.
(e)
(f)The Governor declared a state of emergency on January 6, 2016, in order to facilitate the ongoing state response and efforts to stop the leak.
(g)On February 18, 2016, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation certified that the Aliso Canyon leak had been stopped. Reports estimate almost 100,000 metric tons of the potent greenhouse gas methane was emitted to the atmosphere. Community health concerns continue postleak with over one hundred fifty complaints reported to the County of Los Angeles.
(f)
(h)The standards for natural gas storage wells need to be improved in order to reflect 21st century technology, recognize that these facilities may be in locations near population centers, and ensure a disaster like the Aliso Canyon leak does not happen again.
SEC. 2.Chapter 6 (commencing with Section 42710) is added to Part 4 of Division 26 of the Health and Safety Code, to read:6.Natural Gas Storage Facility Monitoring42710.(a)The state board, in consultation with any local air district and the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation, shall develop a natural gas storage facility monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks. leaks and the presence of natural gas emissions in the atmosphere. The continuous monitoring program may be supplemented by daily leak detection measurements.
(b)The program shall include guidelines for the continuous monitoring which shall include, at minimum, spectral visual optical gas imaging and accurate quantitative chemical analytical monitoring. monitoring of natural gas concentrations. The program shall include protocols for both stationary and mobile monitoring, as well as fixed and temporary monitoring locations.
(c)An operator of a natural gas storage facility shall develop and submit to the state board a facility monitoring plan that satisfies program requirements pursuant to subdivision (a). The state board shall review the plan and may approve or disapprove the plan.
(c)
(d)Monitoring data shall be provided to the state board. All materials provided to comply with this section shall be posted and available to the public on the Internet Web site of the Division of Oil, Gas, and Geothermal Resources.
SEC. 3.Section 3133 is added to the Public Resources Code, to read:3133.(a)As used in this article, natural gas storage well means an active or idle natural gas storage well serving or located in a natural gas storage facility.
(b)Before January 1, 2018, and annually thereafter, the division shall inspect all natural gas storage wells.
(c)A natural gas storage well in existence on December 31, 2016, shall be brought into compliance with this article by ____. The use of a natural gas storage well older than ____ shall be phased out by ____.
SEC. 4.Section 3134 is added to the Public Resources Code, to read:3134.A natural gas storage well shall meet all of the following standards:
(a)The well shall have an automatic downhole shutoff system, including, but not limited to, surface-controlled subsurface safety valves, deployed in order to limit leaks associated with a loss of the integrity of a well, well casing, or cementing. The shutoff system shall be tested and the results of the test shall be reported to the division no less than annually.
(b)Proactive evaluation of the integrity of the well, well casing, or and cementing across the entire length of the well shall be conducted in order to quantitatively thoroughly, quantitatively, and accurately assess their condition. These assessments shall be performed using the best available technology. Based upon these assessments, the risks posed by erosion, corrosion, aging, scaling, cracking, and any other process that may produce natural gas leaks. This evaluation shall include visual imaging along the entire length of the well. leaks shall be determined. A natural gas storage well that has lost integrity or that is at risk of an imminent loss of integrity shall be immediately repaired before returning to service. A natural gas storage well at high risk of a loss of integrity shall be evaluated pursuant to the measures in this subdivision at least annually if the well was originally drilled more than 20 years ago. annually.
(c)Natural gas injection and production shall be through tubing only and isolated from contact with the well casing.
(d)Annular pressure and production or injection flow rate shall be continuously monitored.
SEC. 5.Section 3135 is added to the Public Resources Code, to read:3135.(a)For the purposes of this section, sensitive receptor includes, but is not limited to, a school, hospital, and residential housing.
(b)In addition to the requirements of Section 3134, a natural gas storage well that is within 10,000 feet of a sensitive receptor shall meet both of the following requirements:
(1)Have continuous air quality monitoring for of natural gas concentrations to identify natural gas leaks at the wellhead.
(2)Be evaluated pursuant to the measures in subdivision (b) of Section 3134 at least annually.
(c)The division shall not issue a permit for a new natural gas storage well located within ____ feet of a sensitive receptor, and the division shall order operators to cease the use of, and plug and abandon, an existing natural gas storage well within _____ feet of a sensitive receptor by ____.
SEC. 6.Section 3136 is added to the Public Resources Code, to read:3136.(a)The operator of a natural gas storage well shall submit for the supervisors approval the following materials:
(1)A regular maintenance program for the well and the portion of the facility within the divisions jurisdiction. The maintenance program shall include training for site personnel and proactive replacement of equipment at risk of failure to ensure safe operation.
(2)Operating Design and operating conditions and parameters for the well and the portion of the facility within the divisions jurisdiction.
(3)A An inspection, leak detection, and monitoring program for the well and the portion of the facility within the divisions jurisdiction that includes air quality monitoring of natural gas concentrations pursuant to Chapter 6 (commencing with Section 42710) of Part 4 of Division 26 of the Health and Safety Code. Air quality Ambient natural gas monitoring sufficient to include monitoring of a new or reworked well shall be in operation before a new well is drilled or a well is reworked.
(4)A site-specific risk management plan to identify and plan for mitigation of all hazards and potential hazards associated with natural gas storage well operation. The risk management plan shall provide for regular review and revision, as needed, to ensure the plan appropriately reflects current conditions. The risk management plan shall include, but is not limited to, all of the following:
(4)
(A)A natural gas leak prevention and response program that addresses the full range of natural gas leaks possible at the facility with specific response plans that provide for immediate control of the leak. The prevention and response program shall include, but is not limited to, all of the following:
(A)
(i)A protocol for public notice of the leak to the community by the operator.
(B)
(ii)Prepositioning and identification of materials and personnel necessary to respond to leaks. This shall include materials, including equipment to capture leaked gas, to respond to the leak itself as well as to protect public health.
(C)
(iii)A training program to ensure site personnel are prepared to respond to a leak.
(B)A plan for corrosion monitoring and evaluation.
(C)A schedule for regular well and reservoir integrity assessments.
(D)An assessment of the risks associated with the natural gas storage well and its operation.
(E)Planned risk mitigation efforts.
(b)All of the materials described in subdivision (a) shall be approved by the supervisor, at his or her discretion, and in the possession of the division before the supervisor or district deputy approves a notice required pursuant to Section 3203.
(c)All of the materials described in subdivision (a) shall be reported to the division annually. The operator shall not deviate from the programs programs, plans, and other conditions and protocols contained in the materials without prior written approval by the supervisor.
SEC. 7.Section 3137 is added to the Public Resources Code, to read:3137.The public has a right to review the location of a natural gas storage well or conversion of an existing well to a natural gas storage well before the approval of any notice required pursuant to Section 3203.
SEC. 8.Section 3138 is added to the Public Resources Code, to read:3138.In the event of a loss of the integrity of a natural gas storage well, well casing, or cementing resulting in a significant, uncontrolled leak of natural gas, preparations for the drilling of a relief well shall begin within 24 hours of the discovery of the leak regardless of any other activities undertaken to stop the leak.
SEC. 9.Section 3139 is added to the Public Resources Code, to read:3139.In the event of a leak of any size from a natural gas storage well, the operator shall notify the division immediately. Within 24 hours of notification, the division shall post information about the leak on its Internet Web site and provide regular updates to the public until the leak is stopped.
SEC. 10.Section 3140 is added to the Public Resources Code, to read:3140.(a)The division shall convene an independent panel of recognized experts to develop best practices for natural gas storage facilities. The panel shall consider at least of all of the following:
(1)The proximity of a natural gas storage facility and wells to population. populations of people.
(2)The age when or condition at which a well should be plugged and abandoned, and what standards the plugging and abandonment should meet.
(3)The range of proactive methods to assess the integrity of a well, well casing, and cementing. cementing, and identifying the best available technology for these assessments.
(4)A thorough analysis of the risks associated with the conversion of a well for use as a natural gas storage well.
(5)Natural gas storage well operating, maintenance, and monitoring standards.
(b)Upon completion of the panels work pursuant to subdivision (a), the division shall review and incorporate best practices developed by the panel into its regulations for natural gas storage wells, as appropriate, and for other wells under the divisions jurisdiction, as applicable.
SEC. 11.Section 3141 is added to the Public Resources Code, to read:3141.(a)The division, in consultation with the Office of Environmental Health Hazard Assessment, the State Department of Public Health, and the Department of Industrial Relations, shall perform a risk assessment of natural gas storage wells. The risk assessment shall include, but is not limited to, all of the following information:
(1)The age and construction of a well.
(2)The service history and operating conditions of the well.
(3)The potential impact of a leak on public, occupational, and environmental health. health, safety, and welfare.
(b)The risk assessment shall be subjected to peer review by independent experts.
(c)The findings of the risk assessment shall be reported to the Legislature in accordance with Section 9795 of the Government Code.
SEC. 12.Section 3142 is added to the Public Resources Code, to read:3142.To ensure that the division has all the records it needs to evaluate natural gas storage wells, the well history maintained pursuant to Section 3213 shall include all operations, injection, production, and emplacement of any materials into the well. The operator shall disclose the well history to the division for each operation, injection, production, and emplacement of any material into the well.
SEC. 13.Section 3143 is added to the Public Resources Code, to read:3143.All materials provided to the division to comply with Section 3133 to 3142, inclusive, shall be posted and available to the public on the Internet Web site of the division.
SEC. 14.Section 3144 is added to the Public Resources Code, to read:3144.A member of the public may bring suit for writ of mandate against the division for failure to enforce Sections 3133 to 3143, inclusive.
SEC. 15.Section 3236.5 of the Public Resources Code is amended to read:3236.5.(a)A person who violates this chapter or a regulation implementing this chapter is subject to a civil penalty not to exceed twenty-five thousand dollars ($25,000) for each violation. A person who commits a violation of Article 3 (commencing with Section 3150) or Section 3300 is subject to a civil penalty of not less than ten thousand dollars ($10,000) and not to exceed twenty-five thousand dollars ($25,000) per day per violation. An act of God and an act of vandalism beyond the reasonable control of the operator shall not be considered a violation. The civil penalty shall be imposed by an order of the supervisor pursuant to Section 3225 upon a determination that a violation has been committed by the person charged. The imposition of a civil penalty under this section shall be in addition to any other penalty provided by law for the violation. When establishing the amount of the civil penalty pursuant to this section, the supervisor shall consider, in addition to other relevant circumstances, all of the following:
(1)The extent of harm caused by the violation.
(2)The persistence of the violation.
(3)The pervasiveness of the violation.
(4)The number of prior violations by the same violator.
(b)An order of the supervisor imposing a civil penalty shall be reviewable pursuant to Article 6 (commencing with Section 3350). When the order of the supervisor has become final and the penalty has not been paid, the supervisor may apply to the appropriate superior court for an order directing payment of the civil penalty. The supervisor may also seek from the court an order directing that production from the well or use of the production facility that is the subject of the civil penalty order be discontinued until the violation has been remedied to the satisfaction of the supervisor and the civil penalty has been paid.
(c)Any amount collected under this section shall be deposited in the Oil, Gas, and Geothermal Administrative Fund.
SEC. 16.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares as follows:
(a)Public transparency regarding regulations and regulatory activity to protect public health and welfare and natural resources is essential.
(b)On October 23, 2015, a significant, uncontrolled leak from a natural gas storage well that was originally drilled over 60 years ago was discovered in the Aliso Canyon natural gas storage facility located in the County of Los Angeles. Initial efforts to stop the leak failed.
(c)The Division of Oil, Gas, and Geothermal Resources in the Department of Conservation responded swiftly to the leak, including by issuing two orders that, among other things, require the use of relief wells. The division has been working around the clock overseeing efforts to stop the leak.
(d)It was several days before the community was notified of the leak, although numerous residents started reporting odor concerns almost immediately. The leaking well is up the hill and approximately one and one-quarter miles away from the nearest home. Other natural gas storage wells serving this facility are located closer to homes.
(e)The Governor declared a state of emergency on January 6, 2016, in order to facilitate the ongoing state response and efforts to stop the leak.
(f)The standards for natural gas storage wells need to be improved in order to reflect 21st century technology, recognize that these facilities may be in locations near population centers, and ensure a disaster like the Aliso Canyon leak does not happen again.
SEC. 2.Chapter 6 (commencing with Section 42710) is added to Part 4 of Division 26 of the Health and Safety Code, to read:6.Natural Gas Storage Facility Monitoring42710.(a)The state board, in consultation with any local air district and the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation, shall develop a natural gas storage facility monitoring program that includes continuous monitoring of the ambient concentration of natural gas at sufficient locations throughout a natural gas storage facility or planned natural gas storage facility to identify natural gas leaks.
(b)The program shall include guidelines for the continuous monitoring which shall include, at minimum, spectral visual imaging and quantitative chemical analytical monitoring.
(c)All materials provided to comply with this section shall be posted and available to the public on the Internet Web site of the Division of Oil, Gas, and Geothermal Resources.
SEC. 3.Section 3133 is added to the Public Resources Code, to read:3133.(a)As used in this article, natural gas storage well means an active or idle natural gas storage well serving or located in a natural gas storage facility.
(b)Before January 1, 2018, and annually thereafter, the division shall inspect all natural gas storage wells.
(c)A natural gas storage well in existence on December 31, 2016, shall be brought into compliance with this article by ____. The use of a natural gas storage well older than ____ shall be phased out by ____.
SEC. 4.Section 3134 is added to the Public Resources Code, to read:3134.A natural gas storage well shall meet all of the following standards:
(a)The well shall have an automatic downhole shutoff system, including, but not limited to, subsurface safety valves, deployed in order to limit leaks associated with a loss of the integrity of a well, well casing, or cementing. The shutoff system shall be tested and the results of the test shall be reported to the division no less than annually.
(b)Proactive evaluation of the integrity of the well, well casing, or cementing across the entire length of the well shall be conducted in order to quantitatively assess the risks posed by erosion, corrosion, aging, scaling, cracking, and any other process that may produce natural gas leaks. This evaluation shall include visual imaging along the entire length of the well. A natural gas storage well shall be evaluated pursuant to the measures in this subdivision at least annually if the well was originally drilled more than 20 years ago.
(c)Natural gas injection and production shall be through tubing only and isolated from contact with the well casing.
(d)Annular pressure and production or injection flow rate shall be continuously monitored.
SEC. 5.Section 3135 is added to the Public Resources Code, to read:3135.(a)For the purposes of this section, sensitive receptor includes, but is not limited to, a school, hospital, and residential housing.
(b)In addition to the requirements of Section 3134, a natural gas storage well that is within 10,000 feet of a sensitive receptor shall meet both of the following requirements:
(1)Have continuous air quality monitoring for natural gas leaks at the wellhead.
(2)Be evaluated pursuant to the measures in subdivision (b) of Section 3134 at least annually.
(c)The division shall not issue a permit for a new natural gas storage well located within ____ feet of a sensitive receptor, and the division shall order operators to cease the use of, and plug and abandon, an existing natural gas storage well within _____ feet of a sensitive receptor by ____.
SEC. 6.Section 3136 is added to the Public Resources Code, to read:3136.(a)The operator of a natural gas storage well shall submit for the supervisors approval the following materials:
(1)A regular maintenance program for the well and the portion of the facility within the divisions jurisdiction.
(2)Operating conditions and parameters for the well and the portion of the facility within the divisions jurisdiction.
(3)A monitoring program for the well and the portion of the facility within the divisions jurisdiction that includes air quality monitoring pursuant to Chapter 6 (commencing with Section 42710) of Part 4 of Division 26 of the Health and Safety Code. Air quality monitoring sufficient to include a new or reworked well shall be in operation before a new well is drilled or reworked.
(4)A natural gas leak prevention and response program that addresses the full range of natural gas leaks possible at the facility with specific response plans that provide for immediate control of the leak. The prevention and response program shall include, but is not limited to, all of the following:
(A)A protocol for public notice of the leak to the community by the operator.
(B)Prepositioning and identification of materials and personnel necessary to respond to leaks. This shall include materials, including equipment to capture leaked gas, to respond to the leak itself as well as to protect public health.
(C)A training program to ensure site personnel are prepared to respond to a leak.
(b)All of the materials described in subdivision (a) shall be approved by the supervisor, at his or her discretion, and in the possession of the division before the supervisor or district deputy approves a notice required pursuant to Section 3203.
(c)All of the materials described in subdivision (a) shall be reported to the division annually. The operator shall not deviate from the programs and other conditions and protocols contained in the materials without prior written approval by the supervisor.
SEC. 7.Section 3137 is added to the Public Resources Code, to read:3137.The public has a right to review the location of a natural gas storage well or conversion of an existing well to a natural gas storage well before the approval of any notice required pursuant to Section 3203.
SEC. 8.Section 3138 is added to the Public Resources Code, to read:3138.In the event of a loss of the integrity of a natural gas storage well, well casing, or cementing resulting in a significant, uncontrolled leak of natural gas, preparations for the drilling of a relief well shall begin within 24 hours of the discovery of the leak regardless of any other activities undertaken to stop the leak.
SEC. 9.Section 3139 is added to the Public Resources Code, to read:3139.In the event of a leak of any size from a natural gas storage well, the operator shall notify the division immediately. Within 24 hours of notification, the division shall post information about the leak on its Internet Web site and provide regular updates to the public until the leak is stopped.
SEC. 10.Section 3140 is added to the Public Resources Code, to read:3140.(a)The division shall convene an independent panel of recognized experts to develop best practices for natural gas storage facilities. The panel shall consider at least of all the following:
(1)The proximity of a natural gas storage facility and wells to population.
(2)The age when a well should be plugged and abandoned, and what standards the plugging and abandonment should meet.
(3)The range of proactive methods to assess the integrity of a well, well casing, and cementing.
(4)A thorough analysis of the risks associated with the conversion of a well for use as a natural gas storage well.
(5)Natural gas storage well operating, maintenance, and monitoring standards.
(b)Upon completion of the panels work pursuant to subdivision (a), the division shall review and incorporate best practices developed by the panel into its regulations for natural gas storage wells, as appropriate, and for other wells under the divisions jurisdiction, as applicable.
SEC. 11.Section 3141 is added to the Public Resources Code, to read:3141.(a)The division, in consultation with the Office of Environmental Health Hazard Assessment, the State Department of Public Health, and the Department of Industrial Relations, shall perform a risk assessment of natural gas storage wells. The risk assessment shall include, but is not limited to, all of the following information:
(1)The age of a well.
(2)The service history and operating conditions of the well.
(3)The potential impact of a leak on public, occupational, and environmental health.
(b)The risk assessment shall be subjected to peer review by independent experts.
(c)The findings of the risk assessment shall be reported to the Legislature in accordance with Section 9795 of the Government Code.
SEC. 12.Section 3142 is added to the Public Resources Code, to read:3142.To ensure that the division has all the records it needs to evaluate natural gas storage wells, the well history maintained pursuant to Section 3213 shall include all operations, injection, production, and emplacement of any materials into the well. The operator shall disclose the well history to the division for each operation, injection, production, and emplacement of any material into the well.
SEC. 13.Section 3143 is added to the Public Resources Code, to read:3143.All materials provided to the division to comply with Section 3133 to 3142, inclusive, shall be posted and available to the public on the Internet Web site of the division.
SEC. 14.Section 3144 is added to the Public Resources Code, to read:3144.A member of the public may bring suit for writ of mandate against the division for failure to enforce Sections 3133 to 3143, inclusive.
SEC. 15.Section 3236.5 of the Public Resources Code is amended to read:3236.5.(a)A person who violates this chapter or a regulation implementing this chapter is subject to a civil penalty not to exceed twenty-five thousand dollars ($25,000) for each violation. A person who commits a violation of Article 3 (commencing with Section 3150) or Section 3300 is subject to a civil penalty of not less than ten thousand dollars ($10,000) and not to exceed twenty-five thousand dollars ($25,000) per day per violation. An act of God and an act of vandalism beyond the reasonable control of the operator shall not be considered a violation. The civil penalty shall be imposed by an order of the supervisor pursuant to Section 3225 upon a determination that a violation has been committed by the person charged. The imposition of a civil penalty under this section shall be in addition to any other penalty provided by law for the violation. When establishing the amount of the civil penalty pursuant to this section, the supervisor shall consider, in addition to other relevant circumstances, all of the following:
(1)The extent of harm caused by the violation.
(2)The persistence of the violation.
(3)The pervasiveness of the violation.
(4)The number of prior violations by the same violator.
(b)An order of the supervisor imposing a civil penalty shall be reviewable pursuant to Article 6 (commencing with Section 3350). When the order of the supervisor has become final and the penalty has not been paid, the supervisor may apply to the appropriate superior court for an order directing payment of the civil penalty. The supervisor may also seek from the court an order directing that production from the well or use of the production facility that is the subject of the civil penalty order be discontinued until the violation has been remedied to the satisfaction of the supervisor and the civil penalty has been paid.
(c)Any amount collected under this section shall be deposited in the Oil, Gas, and Geothermal Administrative Fund.
SEC. 16.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Sep 1, 2016 | Enrolled and presented to the Governor at 5 p.m. |
| Aug 26, 2016 | Assembly amendments concurred in. (Ayes 36. Noes 2. Page 5444.) Ordered to engrossing and enrolling. |
| Aug 26, 2016 | Assembly amendments concurred in. (Ayes 36. Noes 2.) Ordered to engrossing and enrolling. |
| Aug 25, 2016 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 24, 2016 | Read third time. Passed. Ordered to the Senate. |
| Aug 19, 2016 | Read third time and amended. (Ayes 73. Noes 0. Page 5973.) |
| Aug 19, 2016 | Ordered to third reading. |
| Aug 19, 2016 | Read third time and amended. |
| Aug 18, 2016 | Read second time. Ordered to third reading. |
| Aug 17, 2016 | Read second time and amended. Ordered to second reading. |
| Aug 16, 2016 | From committee: Do pass as amended. (Ayes 11. Noes 2.) (August 11). |
| Aug 3, 2016 | August 3 set for first hearing. Placed on APPR. suspense file. |
| Jun 30, 2016 | Read second time and amended. Re-referred to Com. on APPR. |
| Jun 29, 2016 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 7. Noes 2.) (June 27). |
| Jun 9, 2016 | Referred to Com. on NAT. RES. |
| Jun 2, 2016 | In Assembly. Read first time. Held at Desk. |
| Jun 1, 2016 | Read third time. Passed. (Ayes 30. Noes 9. Page 4091.) Ordered to the Assembly. |
| Jun 1, 2016 | Read third time. Passed. (Ayes 30. Noes 9.) Ordered to the Assembly. |
| May 31, 2016 | Read second time and amended. Ordered to third reading. |
| May 27, 2016 | From committee: Do pass as amended. (Ayes 5. Noes 2. Page 3999.) (May 27). |
| May 27, 2016 | From committee: Do pass as amended. (Ayes 5. Noes 2.) (May 27). |
| May 20, 2016 | Set for hearing May 27. |
| May 16, 2016 | May 16 hearing: Placed on APPR. suspense file. (Ayes 7. Noes 0.) |
| May 6, 2016 | Set for hearing May 16. |
| Apr 26, 2016 | Read second time and amended. Re-referred to Com. on APPR. |
| Apr 25, 2016 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 6. Noes 1. Page 3642.) (April 20). |
| Apr 25, 2016 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 6. Noes 1.) (April 20). |
| Mar 29, 2016 | From committee: Do pass and re-refer to Com. on E.Q. (Ayes 7. Noes 2. Page 3312.) (March 29). Re-referred to Com. on E.Q. |
| Mar 29, 2016 | From committee: Do pass and re-refer to Com. on E.Q. (Ayes 7. Noes 2.) (March 29). Re-referred to Com. on E.Q. |
| Mar 28, 2016 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on N.R. & W. |
| Mar 9, 2016 | Set for hearing March 29. |
| Jan 28, 2016 | Referred to Coms. on N.R. & W. and E.Q. |
| Jan 21, 2016 | From printer. May be acted upon on or after February 20. |
| Jan 20, 2016 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 26, 2016 | Unfinished Business SB887 Pavley Concurrence | Senate Floor |
Passed |
|
| Aug 24, 2016 | SB 887 Pavley Senate Third Reading By WILK | Assembly Floor |
Passed |
|
| Aug 19, 2016 | SB 887 Pavley Senate Third Reading By V. A. Amendment Set #1 | Assembly Floor |
Passed |
|
| Aug 11, 2016 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jun 27, 2016 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
|
| Jun 1, 2016 | Senate 3rd Reading SB887 Pavley | Senate Floor |
Passed |
|
| May 27, 2016 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| May 16, 2016 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 20, 2016 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Environmental Quality |
Passed |
|
| Mar 29, 2016 | Do pass, but first be re-referred to the Committee on [Environmental Quality] | Senate Standing Committee on Natural Resources and Water |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB |
UNFINISHED BUSINESS
Bill No: SB 887
:
SENATE NATURAL RES. & WATER COMMITTEE: 7-2, 3/29/16
AYES: Pavley, Allen, Hertzberg, Hueso, Jackson, Monning, Wolk
NOES: Stone, Vidak
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 6-1, 4/20/16
AYES: Wieckowski, Gaines, Hill, Jackson, Leno, Pavley
NOES: Bates
SENATE APPROPRIATIONS COMMITTEE: 5-2, 5/27/16
AYES: Lara, Beall, Hill, McGuire, Mendoza
NOES: Bates, Nielsen
SENATE FLOOR: 30-9, 6/1/16
AYES: Allen, Anderson, Beall, Block, De León, Gaines, Galgiani, Glazer, Hall, Hancock, Hernandez, Hertzberg, Hill, Hueso, Huff, Jackson, Lara, Leno, Leyva, Liu, McGuire, Mendoza, Mitchell, Monning, Moorlach, Pan, Pavley, Roth, Wieckowski, Wolk
NOES: Bates, Berryhill, Cannella, Fuller, Morrell, Nguyen, Nielsen, Stone, Vidak
NO VOTE RECORDED: Runner
ASSEMBLY FLOOR: 75-1, 8/24/16 - See last page for vote
DIGEST: This bill provides a framework for reforming the oversight and regulation of natural gas storage wells.
Assembly Amendments align the bill’s provisions with regulatory activities underway at the Division of Oil, Gas and Geothermal Resources (DOGGR), extend DOGGR’s emergency regulations, and revise the existing fee that supports DOGGR’s regulatory activities.
Existing law:
- Establishes DOGGR in the Department of Conservation at the Natural Resources Agency. DOGGR is the state’s oil and gas regulator, and DOGGR’s leader is the oil and gas supervisor (supervisor).
- Requires the supervisor to supervise the drilling, operation, maintenance, and abandonment of oil and gas wells and the operation, maintenance, and removal or abandonment of tanks and facilities attendant to oil and gas production in order to prevent damage to life, property and natural resources, among other reasons.
- Requires the operator of any oil and gas well, before commencing the work of drilling the well, among other actions, to file with the supervisor a notice of intention, and the notice of intention is subject to approval.
- Provides that natural gas storage facilities are subject to the overall jurisdiction of the California Public Utilities Commission (CPUC). Natural gas storage wells and associated piping and equipment are under the jurisdiction of DOGGR.
- Establishes the Air Resources Board (ARB) in the California Environmental Protection Agency. ARB has jurisdiction over greenhouse gas emissions and is required to adopt rules and regulations to achieve maximum technologically feasible and cost-effective greenhouse gas emission emissions reductions.
- Requires the supervisor to continue the prohibition against the Southern California Gas Company (SoCalGas) injecting natural gas into the Aliso Canyon gas storage facility in Los Angeles until a comprehensive review of the safety of the gas storage wells at the Aliso Canyon facility is completed and the supervisor determines that well integrity has been ensured by the review, as specified.
- Requires the CPUC, no later than July 1, 2017, to open a proceeding on the feasibility of minimizing or eliminating use of the Aliso Canyon gas storage facility while still maintaining energy and electric reliability for the region.
This bill provides a framework for reforming the oversight and regulation of natural gas storage wells. Specifically, this bill:
- Requires ARB, as specified, to develop a natural gas storage facilities monitoring program that includes continuous monitoring of ambient concentrations of natural gas to identify leaks.
- Requires an operator of a gas storage facility to develop and submit to the ARB a monitoring plan and the monitoring data.
- Defines "gas storage well" as an active or idle well used primarily to inject natural gas or withdraw natural gas from an underground natural gas storage facility.
- Requires, on or before January 1, 2018, all gas storage wells to have commenced a mechanical integrity testing regime that includes leak testing, casing wall thickness inspection, pressure testing, and any other testing deemed necessary by DOGGR.
- Requires DOGGR to promulgate regulations that establish standards for the design, construction, and maintenance of all gas storage wells to ensure that integrity concerns with a gas storage well are identified and addressed before they can become a threat to life, health, property, the climate, or natural resources.
- Requires gas storage wells to be designed, constructed, and maintained to ensure that a single point of failure does not pose an immediate threat of loss of control of fluids.
- Requires operators to submit for the supervisor’s approval various material including:
- Data demonstrating stored gas is confined to the approved zone;
- A risk management plan;
- A natural gas leaks prevention and response program;
- A protocol for public notice of a large, uncontrollable leak;
- A plan for corrosion monitoring and evaluation;
- Planned risk mitigation efforts; and,
- A regular maintenance program.
- Requires DOGGR to perform unannounced random onsite inspections of some gas storage wells annually.
- Requires an operator to develop and maintain a comprehensive gas storage well training and mentoring program for employees. In addition, if storage field employees are represented by a labor union, the operator must consult with the relevant union local.
- Revises the annual fees charged to support gas storage well regulatory efforts at DOGGR be proportional to the product of the number of wells and the total field capacity of the reservoir divided by the statewide sum of this product across all storage reservoirs.
- Requires, in the event of a large uncontrolled release of gas from a storage reservoir, that an additional charge to defray DOGGR’s costs for its response be assessed, as specified.
- Requires for any new gas storage facility proposed that the CPUC ensures a risk assessment is conducted that evaluates potential impacts of a leak on public and environmental health, safety, and welfare.
- Requires DOGGR's emergency regulations related to underground gas storage projects to remain in effect until January 1, 2019.
- Provides that specific provisions for the Aliso Canyon gas storage facility instituted by SB 380 (Pavley, Chapter 14, Statutes of 2016) shall not be diminished or impaired by this bill.
Background
On Friday, October 23, 2015, a natural gas storage well owned by SoCalGas and located in the Aliso Canyon storage field in close proximity to the Porter Ranch neighborhood in Los Angeles County began leaking natural gas. The leak continued until it was initially controlled on February 11, 2016, and the plug was confirmed on February 18, 2016. During the four months the well leaked, there were numerous attempts to control it. All attempts to stop the leak from the top of the well failed. A relief well was finally able to stop the natural gas leak by plugging the leaking well at its base. According to a recent study, the leak at Aliso Canyon released approximately 100,000 metric tons of the potent greenhouse gas methane to the atmosphere. This was estimated to be about 20% of total statewide emissions during the four months of the leak.
On Wednesday following the discovery of the leak, SoCal Gas acknowledged that the leak was not “routine maintenance.” The South Coast Air Quality Management District (SCAQMD), the local air quality regulator, had begun receiving complaints from the community when the leak started. Ultimately, SCAQMD received thousands of complaints regarding the odor. Some people may experience adverse health effects to the odorants added to natural gas, such as nausea and headaches. In mid-November, the Los Angeles County Department of Public Health, citing public health concerns associated with the use of odorants in the natural gas, ordered SoCal Gas to provide temporary housing relocation assistance to affected residents and announced a local health emergency. Over 8,000 households were relocated due to the leak. Now that the leak has been stopped, residents are returning home, regulators are investigating the cause of the leak, and a comprehensive safety review of the other 114 wells at the field is in progress.
Numerous state entities responded to the leak. In particular, the supervisor issued two orders (in November and December) to provide direction on actions taken while trying to stop the leak. On January 6, 2016, the Governor issued a proclamation of a state of emergency, which directed several state agencies – DOGGR, CPUC, ARB, the California Energy Commission, the Office of Environmental Health Hazard Assessment, among others – to take specific actions in response to the Aliso Canyon gas leak. In particular, DOGGR was directed to issue emergency regulations to improve regulation for gas storage wells, and, on February 5, 2016, these emergency regulations went into effect. The emergency regulations instituted risk-based management of natural gas storage wells among other things. When the leak was capped, the supervisor issued another order to SoCal Gas which established a certain safety protocol focused on a rigorous evaluation of well integrity that needed to be completed before injections could resume at Aliso Canyon. DOGGR continues to work with Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory, and Sandia National Laboratory in developing permanent regulations for gas storage wells. A discussion draft of the regulations was released July 8, 2016. This bill is consistent with the proposals in DOGGR’s discussion draft.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
According to the Assembly Appropriations Committee there are no additional costs associated with this bill.
American Lung Association in California
Asian Pacific Environmental Network
Michael Bennett, Goleta City Councilmember
California Coastal Protection Network
CalPIRG
Center on Race, Poverty & the Environment
Clean Power Campaign
Clean Water Action
Consumer Attorneys of California
Environment California
Environmental Defense Fund
Environmental Working Group
Los Angeles City Council
Los Angeles County
Los Angeles County Democratic Party
Los Angeles Unified School District
Natural Resources Defense Council
Porter Ranch Neighborhood Council
Scott Schmerelson, LAUSD Board Member, District 3
Sierra Club California
Santa Susana Mountain Parks Association
South Coast Air Quality Management District
Utility Workers Union of America
Voices for Progress
OPPOSITION: (Verified 8/23/16)
None received
ARGUMENTS IN SUPPORT: According to the author, “a leak like the one in Aliso Canyon must not be allowed to happen again. Thousands of my constituents have had their health or their loved ones’ health affected by the leak. Lives, families, businesses and communities were disrupted for months. This disruption continues even though the leak was finally stopped over 5 months ago. We must not allow a rapid return to ‘business-as-usual’ when it comes to the oversight and monitoring of these wells and facilities. We now are aware of the all-too-real risks to public health and the environment posed by natural gas facilities and must ensure meaningful changes occur in their operations.”
“After the leak started, state and local regulators worked diligently to protect the public and stop it. Going forward, it is important that new standards for gas storage wells be set to ensure safe operation, including regular testing and evaluation of wells to prevent leaks from starting.”
“SB 887 also addresses the public communication problems experienced at the start of the Aliso Canyon leak by requiring improved planning and more rapid and complete reporting and dissemination of information to the public.”
ASSEMBLY FLOOR: 75-1, 8/24/16
AYES: Achadjian, Alejo, Travis Allen, Arambula, Atkins, Baker, Bigelow, Bloom, Bonilla, Bonta, Brough, Brown, Burke, Calderon, Campos, Chang, Chau, Chávez, Chiu, Chu, Cooley, Cooper, Dababneh, Dodd, Eggman, Beth Gaines, Gallagher, Cristina Garcia, Eduardo Garcia, Gatto, Gipson, Gomez, Gonzalez, Gordon, Gray, Grove, Hadley, Roger Hernández, Holden, Irwin, Jones, Jones-Sawyer, Kim, Lackey, Levine, Linder, Lopez, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Mullin, Nazarian, Obernolte, O'Donnell, Olsen, Patterson, Quirk, Ridley-Thomas, Rodriguez, Salas, Santiago, Steinorth, Mark Stone, Thurmond, Ting, Wagner, Waldron, Weber, Wilk, Williams, Wood, Rendon
NOES: Harper
NO VOTE RECORDED: Dahle, Daly, Frazier, Melendez
8/25/16 17:45:07
**** END ****
SENATE THIRD READING
STR Bill Id:SB 887
Author:(Pavley)
As Amended Ver:August 19, 2016
Majority vote
SENATE VOTE: 30-9
Committee | Votes | Ayes | Noes |
Natural Resources | 7-2 | Williams, Cristina Garcia, Gomez, Hadley, McCarty, Mark Stone, Wood | Jones, Harper |
Appropriations | 11-2 | Gonzalez, Bloom, Bonilla, Bonta, Eggman, Eduardo Garcia, Quirk, Santiago, Weber, Wood, McCarty | Bigelow, Obernolte |
SUMMARY: Provides a framework for reforming the oversight of gas storage wells. Specifically, this bill:
- Requires Air Resources Board (ARB), in consultation with any local air district and Division of Oil, Gas, and Geothermal Resources (DOGGR), to develop a natural gas storage facilities (Facility) monitoring program that includes continuous monitoring of ambient concentrations of natural gas at a Facility to identify natural gas leaks. Requires the program to include guidelines for continuous monitoring that include optical gas imaging, where applicable, and accurate quantitative monitoring of natural gas concentrations.
- Requires an operator of a Facility to develop and submit to the ARB a Facility monitoring plan and the monitoring data.
- Defines "gas storage well" as an active or idle well used primarily to inject natural gas or withdraw natural gas from an underground natural gas storage facility.
- Requires, on or before January 1, 2018, all gas storage wells to have commenced a mechanical integrity testing regime that includes leak testing, casing wall thickness inspection, pressure testing, and any other testing deemed necessary by DOGGR.
- Requires DOGGR to promulgate regulations that establish standards for the design, construction, and maintenance of all gas storage wells to ensure that integrity concerns with a gas storage well are identified and addressed before they can become a threat to life, health, property, the climate, or natural resources.
- Requires gas storage wells to be designed, constructed, and maintained to ensure that a single point of failure does not pose an immediate threat of loss of control of fluids.
- Requires operators to submit for the Oil and Gas Supervisor's (Supervisor) approval various material including:
- Data demonstrating stored gas is confined to the approved zone;
- A risk management plan;
- A natural gas leaks prevention and response program;
- A protocol for public notice of a large, uncontrollable leak;
- A plan for corrosion monitoring and evaluation;
- Planned risk mitigation efforts; and,
- A regular maintenance program.
- Requires DOGGR to perform unannounced random onsite inspections of some gas storage wells annually.
- Requires an operator to develop and maintain a comprehensive gas storage well training and mentoring program for employees. Specifies if storage field employees are represented by a labor union, the operator must consult with the relevant union local.
- Alters annual fees charged by Supervisor to support regulatory efforts at DOGGR for Facilities to include wells that are not actively injecting and withdrawing gas and specifies a new formula for determining how to apportion the fees.
- Requires an additional charge to defray DOGGR’s costs for its response efforts to a large uncontrolled release of gas from a Facility. Requires the additional charge to be imposed entirely on the operator of the Facility where the leak occurred.
- Requires the Public Utility Commission (CPUC) to ensure a risk assessment is conducted on any new Facility evaluating potential impacts of a leak from the facility on public and environmental health, safety, and welfare.
- Requires DOGGR's emergency regulations related to underground gas storage projects to remain in effect until January 1, 2019.
EXISTING LAW:
- Establishes DOGGR as the state's oil and gas regulator.
- Requires the Supervisor to supervise the drilling, operation, maintenance, and abandonment of wells and the operation, maintenance, and removal or abandonment of tanks and facilities attendant to oil and gas production.
- Defines "well" to mean any oil or gas well or well for the discovery of oil or gas; any well on lands producing or reasonably presumed to contain oil or gas; any well drilled for the purpose of injecting fluids or gas for stimulating oil or gas recovery, repressuring or pressure maintenance of oil or gas reservoirs, or disposing of waste fluids from an oil or gas field; any well used to inject or withdraw gas from an underground storage facility; or any well drilled within or adjacent to an oil or gas pool for the purpose of obtaining water to be used in production stimulation or repressuring operations.
- Requires the operator of any well, before commencing the work of drilling the well, to file with the Supervisor a notice of intention (NOI). Requires approval of the NOI by the Supervisor. Authorizes the Supervisor to deny approval of proposed well operations for failure to comply with an order until the operator brings its existing well operations into compliance with the order.
- Prohibits the unreasonable waste of natural gas by the act, omission, sufferance, or insistence of the lessor, lessee, or operator of any land containing oil or gas, or both.
- Authorizes CPUC to regulate gas corporations, including Facilities.
- Requires Facilities to receive a Certificate of Public Convenience and Necessity (CPCN) before constructing a Facility. Requires that the CPUC grant a CPCN on the grounds that the present or future public convenience and necessity requires or will require the Facility.
- Requires, pursuant to the California Global Warming Solutions Act (AB 32 (Núñez), Chapter 488, Statutes 20016), ARB to adopt a statewide greenhouse gas (GHG) emissions limit equivalent to 1990 levels by 2020 and to adopt rules and regulations to achieve maximum technologically feasible and cost-effective GHG emission reductions.
- Requires the Supervisor to continue the prohibition against Southern California Gas Company (SoCalGas) injecting any natural gas into the Aliso Canyon Facility located in the County of Los Angeles until a comprehensive review of the safety of the gas storage wells at the Facility is completed and the Supervisor determines that well integrity has been ensured by the review. Prohibits the Supervisor from lifting the prohibition on injection until the Executive Director of the CPUC has concurred via letter with the Supervisor regarding his or her determination of safety.
- Requires the CPUC, no later than July 1, 2017, to open a proceeding on the feasibility of minimizing or eliminating use of the Aliso Canyon Facility while still maintaining energy and electric reliability for the region.
FISCAL EFFECT: According to the Assembly Appropriations Committee no additional costs.
COMMENTS:
- Aliso Canyon leak. On October 23, 2015, a natural gas storage well, known as "SS-25," owned by SoCalGas and located in the Aliso Canyon storage field in close proximity to the Porter Ranch neighborhood in Los Angeles County began leaking natural gas. The leak continued until it was initially controlled on February 11, 2016, and the well was successfully sealed on February 18, 2016. During the four months the well leaked, there were numerous attempts to control it. All attempts to stop the leak from the top of the well failed. A relief well was finally able to stop the natural gas leak by plugging the leaking well at its base. According to a recent study, the leak at Aliso Canyon was the largest natural gas leak recorded in the United States, doubling the methane emission rate of the entire Los Angeles basin. Methane is a potent GHG with a global warming potential more than 80 times as powerful as carbon dioxide.
The South Coast Air Quality Management District has received thousands of complaints regarding the odor. Complaints by residents suggest that mercaptans, which are odorants required to be added to natural gas, were present in Porter Ranch at varying levels since the gas leak started. Some people may experience adverse health effects to the strong odors of mercaptans, such as nausea and headaches. In mid-November, the Los Angeles County Department of Public Health, citing public health concerns associated with the use of odorants in the natural gas, ordered SoCal Gas to provide temporary housing relocation assistance to affected residents. Over 8,000 households were relocated due to the leak. Now that the leak has been stopped, residents are returning home, regulators are investigating the cause of the leak, and a comprehensive safety review of the other 114 wells at the field is in progress.
- Natural gas storage facilities. Natural gas providers inject natural gas into large underground reservoirs for storage before later withdrawing the gas for sale during peak load periods. These underground reservoirs often contained oil or gas that has already been extracted. Natural gas providers utilize these facilities to reduce the cost of procurement and to maintain adequate supply of natural gas during peak times. While the CPUC regulates natural gas providers, natural gas transmission lines, and the permitting of Facilities, it is DOGGR that regulates the wells that natural gas is injected into and withdrawn from. Gas storage injection wells are the only type of injection wells in DOGGR's Underground Injection Control (UIC) program that are not part of the primacy agreement with US Environmental Protection Agency. DOGGR's UIC program regulates 14 active gas storage facilities in 12 separate fields across the state to ensure well construction and integrity, appropriateness of the injection site, and zonal isolation of the injections. Each Facility may contain dozens of active gas storage wells. There are 343 active and 85 idle natural gas storage wells in the state. Some natural gas storage facilities have been in operation since the 1940s, and approximately half of the active wells are over 40 years old. Natural gas storage wells vary in construction, depth, design, age, location, and operating conditions. In Aliso Canyon, the wells were drilled in the 1940s for production purposes and then converted into storage wells. The wells at Aliso Canyon do not contain a cement barrier along the entire length of the casing and have had a history of well integrity issues.
- State actions. On January 6, 2016, the Governor issued a proclamation of a state of emergency, which directed several state agencies to act in response to the Aliso Canyon gas leak. These actions included all of the following:
- Direction to DOGGR to continue prohibiting all injections into Aliso Canyon;
- Direction to CPUC and California Energy Commission (CEC) to reduce the pressure of the facility by withdrawing gas;
- Direction to ARB to require real-time monitoring of emissions;
- Direction to Office of Environmental Health Hazard Assessment to review public health concerns, ensure energy and natural gas reliability;
- Direction to DOGGR to promulgate emergency regulations to require new safety and reliability measures for underground natural gas storage facilities; and,
- Direction to DOGGR, CPUC, ARB, and CEC to assess the long-term viability of natural gas storage facilities.
On February 5, 2016, DOGGR established emergency regulations to improve the regulation of gas storage wells. The regulations include the requirement that within six months (August 6) after the regulations become effective, the operator of a gas storage facility to submit a Risk Management Plan to DOGGR to assess the integrity and risk associated with their gas storage project. DOGGR is working with Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory, and Sandia National Laboratory on its permanent regulations for gas storage wells. A discussion draft of the regulations was released July 8, 2016. This bill is consistent with the proposals in DOGGR’s discussion draft.
Analysis Prepared by: Michael Jarred / NAT. RES. / (916) 319-2092 FN: 0004632
SENATE THIRD READING
STR Bill Id:SB 887
Author:(Pavley)
As Amended Ver:August 17, 2016
Majority vote
SENATE VOTE: 30-9
Committee | Votes | Ayes | Noes |
Natural Resources | 7-2 | Williams, Cristina Garcia, Gomez, Hadley, McCarty, Mark Stone, Wood | Jones, Harper |
Appropriations | 11-2 | Gonzalez, Bloom, Bonilla, Bonta, Eggman, Eduardo Garcia, Quirk, Santiago, Weber, Wood, McCarty | Bigelow, Obernolte |
SUMMARY: Provides a framework for reforming the oversight of gas storage wells. Specifically, this bill:
- Requires Air Resources Board (ARB), in consultation with any local air district and Division of Oil, Gas, and Geothermal Resources (DOGGR), to develop a natural gas storage facilities (Facility) monitoring program that includes continuous monitoring of ambient concentrations of natural gas at a Facility to identify natural gas leaks. Requires the program to include guidelines for continuous monitoring that include optical gas imaging, where applicable, and accurate quantitative monitoring of natural gas concentrations.
- Requires an operator of a Facility to develop and submit to the ARB a Facility monitoring plan and the monitoring data.
- Defines "gas storage well" as an active or idle well used primarily to inject natural gas or withdraw natural gas from an underground natural gas storage facility.
- Requires, on or before January 1, 2018, all gas storage wells to have commenced a mechanical integrity testing regime that includes leak testing, casing wall thickness inspection, pressure testing, and any other testing deemed necessary by DOGGR.
- Requires DOGGR to promulgate regulations that establish standards for the design, construction, and maintenance of all gas storage wells to ensure that integrity concerns with a gas storage well are identified and addressed before they can become a threat to life, health, property, the climate, or natural resources.
- Requires gas storage wells to be designed, constructed, and maintained to ensure that a single point of failure does not pose an immediate threat of loss of control of fluids.
- Requires operators to submit for the Oil and Gas Supervisor's (Supervisor) approval various material including:
- Data demonstrating stored gas is confined to the approved zone;
- A site-specific risk management plan;
- A natural gas leaks prevention and response program;
- A protocol for public notice of a large, uncontrollable leak;
- A plan for corrosion monitoring and evaluation;
- Planned risk mitigation efforts; and,
- A regular maintenance program.
- Requires DOGGR to perform unannounced random onsite inspections of some gas storage wells annually.
- Requires an operator to develop and maintain a comprehensive gas storage well training and mentoring program for employees. Specifies if storage field employees are represented by a labor union, the operator must consult with the relevant union local.
- Alters annual fees charged by Supervisor to support regulatory efforts at DOGGR for Facilities to include wells that are not actively injecting and withdrawing gas and specifies a new formula for determining how to apportion the fees.
- Requires an additional charge to defray DOGGR's costs for its response efforts to a large uncontrolled release of gas from a Facility. Requires the additional charge to be imposed entirely on the operator of the Facility where the leak occurred.
- Requires the Public Utility Commission (CPUC) to ensure a risk assessment is conducted on any new Facility evaluating potential impacts of a leak from the facility on public and environmental health, safety, and welfare.
- Requires DOGGR's emergency regulations related to underground gas storage projects to remain in effect until January 1, 2019.
EXISTING LAW:
- Establishes DOGGR as the state's oil and gas regulator.
- Requires the Supervisor to supervise the drilling, operation, maintenance, and abandonment of wells and the operation, maintenance, and removal or abandonment of tanks and facilities attendant to oil and gas production.
- Defines "well" to mean any oil or gas well or well for the discovery of oil or gas; any well on lands producing or reasonably presumed to contain oil or gas; any well drilled for the purpose of injecting fluids or gas for stimulating oil or gas recovery, repressuring or pressure maintenance of oil or gas reservoirs, or disposing of waste fluids from an oil or gas field; any well used to inject or withdraw gas from an underground storage facility; or any well drilled within or adjacent to an oil or gas pool for the purpose of obtaining water to be used in production stimulation or repressuring operations.
- Requires the operator of any well, before commencing the work of drilling the well, to file with the Supervisor a notice of intention (NOI). Requires approval of the NOI by the Supervisor. Authorizes the Supervisor to deny approval of proposed well operations for failure to comply with an order until the operator brings its existing well operations into compliance with the order.
- Prohibits the unreasonable waste of natural gas by the act, omission, sufferance, or insistence of the lessor, lessee, or operator of any land containing oil or gas, or both.
- Authorizes CPUC to regulate gas corporations, including Facilities.
- Requires Facilities to receive a Certificate of Public Convenience and Necessity (CPCN) before constructing a Facility. Requires that the CPUC grant a CPCN on the grounds that the present or future public convenience and necessity requires or will require the Facility.
- Requires, pursuant to the California Global Warming Solutions Act (AB 32 (Núñez), Chapter 488, Statutes of 2006), ARB to adopt a statewide greenhouse gas (GHG) emissions limit equivalent to 1990 levels by 2020 and to adopt rules and regulations to achieve maximum technologically feasible and cost-effective GHG emission reductions.
- Requires the Supervisor to continue the prohibition against Southern California Gas Company (SoCalGas) injecting any natural gas into the Aliso Canyon Facility located in the County of Los Angeles until a comprehensive review of the safety of the gas storage wells at the Facility is completed and the Supervisor determines that well integrity has been ensured by the review. Prohibits the Supervisor from lifting the prohibition on injection until the Executive Director of the CPUC has concurred via letter with the Supervisor regarding his or her determination of safety.
- Requires the CPUC, no later than July 1, 2017, to open a proceeding on the feasibility of minimizing or eliminating use of the Aliso Canyon Facility while still maintaining energy and electric reliability for the region.
FISCAL EFFECT: According to the Assembly Appropriations Committee:
- Increased first-year costs of approximately $4.68 million and ongoing annual costs of approximately $3.75 million (Oil, Gas and Geothermal Administrative Fund) for DOGGR regulatory activities.
- Potentially significant costs, in the million dollar range, for OEHHA to conduct the risk assessment (Oil, Gas and Geothermal Administrative Fund).
- Increased costs of approximately $360,000 (Oil, Gas and Geothermal Administrative Fund) for DPH to contribute to the risk assessment.
- Minor and absorbable costs to the Air Resources Board (ARB) and the California Public Utilities Commission (PUC).
COMMENTS:
- Aliso canyon leak. On October 23, 2015, a natural gas storage well, known as "SS-25," owned by SoCalGas and located in the Aliso Canyon storage field in close proximity to the Porter Ranch neighborhood in Los Angeles County began leaking natural gas. The leak continued until it was initially controlled on February 11, 2016, and the well was successfully sealed on February 18, 2016. During the four months the well leaked, there were numerous attempts to control it. All attempts to stop the leak from the top of the well failed. A relief well was finally able to stop the natural gas leak by plugging the leaking well at its base. According to a recent study, the leak at Aliso Canyon was the largest natural gas leak recorded in the United States, doubling the methane emission rate of the entire Los Angeles basin. Methane is a potent GHG with a global warming potential more than 80 times as powerful as carbon dioxide.
The South Coast Air Quality Management District has received thousands of complaints regarding the odor. Complaints by residents suggest that mercaptans, which are odorants required to be added to natural gas, were present in Porter Ranch at varying levels since the gas leak started. Some people may experience adverse health effects to the strong odors of mercaptans, such as nausea and headaches. In mid-November, the Los Angeles County Department of Public Health, citing public health concerns associated with the use of odorants in the natural gas, ordered SoCal Gas to provide temporary housing relocation assistance to affected residents. Over 8,000 households were relocated due to the leak. Now that the leak has been stopped, residents are returning home, regulators are investigating the cause of the leak, and a comprehensive safety review of the other 114 wells at the field is in progress.
- Natural gas storage facilities. Natural gas providers inject natural gas into large underground reservoirs for storage before later withdrawing the gas for sale during peak load periods. These underground reservoirs often contained oil or gas that has already been extracted. Natural gas providers utilize these facilities to reduce the cost of procurement and to maintain adequate supply of natural gas during peak times. While the CPUC regulates natural gas providers, natural gas transmission lines, and the permitting of Facilities, it is DOGGR that regulates the wells that natural gas is injected into and withdrawn from. Gas storage injection wells are the only type of injection wells in DOGGR's Underground Injection Control (UIC) program that are not part of the primacy agreement with US Environmental Protection Agency. DOGGR's UIC program regulates 14 active gas storage facilities in 12 separate fields across the state to ensure well construction and integrity, appropriateness of the injection site, and zonal isolation of the injections. Each Facility may contain dozens of active gas storage wells. There are 343 active and 85 idle natural gas storage wells in the state. Some natural gas storage facilities have been in operation since the 1940s, and approximately half of the active wells are over 40 years old. Natural gas storage wells vary in construction, depth, design, age, location, and operating conditions. In Aliso Canyon, the wells were drilled in the 1940s for production purposes and then converted into storage wells. The wells at Aliso Canyon do not contain a cement barrier along the entire length of the casing and have had a history of well integrity issues.
- State actions. On January 6, 2016, the Governor issued a proclamation of a state of emergency, which directed several state agencies to act in response to the Aliso Canyon gas leak. These actions included all of the following:
- Direction to DOGGR to continue prohibiting all injections into Aliso Canyon;
- Direction to CPUC and California Energy Commission (CEC) to reduce the pressure of the facility by withdrawing gas;
- Direction to ARB to require real-time monitoring of emissions;
- Direction to Office of Environmental Health Hazard Assessment to review public health concerns, ensure energy and natural gas reliability;
- Direction to DOGGR to promulgate emergency regulations to require new safety and reliability measures for underground natural gas storage facilities; and,
- Direction to DOGGR, CPUC, ARB, and CEC to assess the long-term viability of natural gas storage facilities.
On February 5, 2016, DOGGR established emergency regulations to improve the regulation of gas storage wells. The regulations include the requirement that within six months (August 6) after the regulations become effective, the operator of a gas storage facility to submit a Risk Management Plan to DOGGR to assess the integrity and risk associated with their gas storage project. DOGGR is working with Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory, and Sandia National Laboratory on its permanent regulations for gas storage wells. A discussion draft of the regulations was released July 8, 2016. This bill is consistent with the proposals in DOGGR's discussion draft.
Analysis Prepared by: Michael Jarred / NAT. RES. / (916) 319-2092 FN: 0004390
Date of Hearing: August 3, 2016
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
SBPCA Bill Id:SB 887
Author:(Pavley) – As Amended Ver:June 30, 2016
Policy Committee: | Natural Resources | Vote: | 7 - 2 |
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill establishes a framework for reforming the oversight of natural gas storage wells including continuous monitoring and the installation of specified safety technology. The bill also phases out certain wells, and requires the independent development and incorporation of best practices into regulations. Among other things, this bill:
- Requires the Air Resources Board (ARB) in consultation with any local air district and the Division of Oil, Gas, and Geothermal Resources (DOGGR), to develop a Facility monitoring program to identify natural gas leaks, as specified. Requires a Facility operator to develop and submit a monitoring plan and data to the ARB.
- Requires DOGGR to review and update practices for the use of subsurface safety valves in natural gas storage wells to reflect best practices.
- Requires natural gas storage wells to meet various evaluations and requires DOGGR to adopt a schedule for the completion of the evaluations based on risk.
- Requires the Office of Environmental Health Hazard Assessment (OEHHA) and the Department of Public Health, in consultation with DOGGR, to perform a science-based risk assessment of natural gas storage wells to determine the appropriate setback distances from specified populations. Requires DOGGR to review the assessment and appropriately revise its regulations.
- Requires DOGGR to convene an independent review panel to look at risk management and automatic shutoff systems and incorporate best practices into its regulations.
- Requires DOGGR to post all materials required to comply with this bill on its website.
- Establishes a minimum of $10,000 per day and maximum of $25,000 per day penalties for unreasonable waste of natural gas.
FISCAL EFFECT:
- Increased first-year costs of approximately $4.68 million and ongoing annual costs of approximately $3.75 million (Oil, Gas and Geothermal Administrative Fund) for DOGGR regulatory activities.
Potentially significant costs, in the million dollar range, for OEHHA to conduct the risk assessment (Oil, Gas and Geothermal Administrative Fund).
- Increased costs of approximately $360,000 (Oil, Gas and Geothermal Administrative Fund) for DPH to contribute to the risk assessment.
Minor and absorbable costs to the Air Resources Board (ARB) and the California Public Utilities Commission (PUC).
COMMENTS:
- Purpose. On October 23, 2015, SoCalGas detected a methane gas leak at its Aliso Canyon Gas Storage Facility at Well # SS-25. Following an initial evaluation and several attempts to stop the leak, SoCalGas began drilling a relief well in order to plug the leaking well. The initial attempts to plug the leak failed, and the leak lasted 112 days before being permanently capped on February 18, 2016.
A study in the journal Science confirmed that the methane gas leak was not only the largest in California's history, but also the second largest in the nation. According to the lead author of the study, as much as 60 metric tons of methane spewed from the leak each hour.
The leak displaced over 5,000 households, requiring families to move into temporary housing and hotels provided by SoCalGas. Since October 25, 2016, no natural gas has been injected into the facility.
According to the author, we are now aware of the all-too-real risks to public health and the environment posed by natural gas facilities and must ensure meaningful changes occur in their operations. This bill will ensure a rapid response to stop a leak and proactive testing and evaluation of wells to prevent a leak from ever starting.
- Background. Although natural gas storage facilities are subject to the overall utilities jurisdiction of the PUC, natural gas storage wells and associated piping and equipment are under the jurisdiction of DOGGR. Natural gas storage wells represent a small component of the overall Underground Injection Control (UIC) program (approximately 400 wells out of 52,000 statewide), which generally covers permitting, inspection, enforcement, mechanical integrity testing, plugging and abandonment oversight, data management, and public outreach.
DOGGR has acknowledged widespread failures in the implementation of its UIC program, and has released a “Renewal Plan” to guide its commitment to reform. DOGGR has received personnel and funding through recent budgets to improve program implementation, data management, enforcement and other functions.
On July 8, 2016, DOGGR publicly released pre-rulemaking draft regulations (Discussion Draft) for the purpose of receiving public input on the development of updates to the regulations governing the gas storage program. The public comment period ends on August 11, 2016.
- Discussions Continue. The author's office is continuing to discuss how to incorporate DOGGR's existing and proposed regulations and suggestions of various stakeholders into an appropriate statutory framework.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: June 27, 2016
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Das Williams, Chair
SBPCA Bill Id:SB 887
Author:(Pavley) – As Amended Ver:May 31, 2016
SENATE VOTE: 30-9
SUBJECT: Natural gas storage wells
SUMMARY: Provides a framework for reforming the oversight of natural gas storage wells. Requires continuous monitoring of natural gas storage wells. Requires evaluation, testing, and installation of specified technology and practices for operating natural gas storage wells.
EXISTING LAW:
- Establishes the Division of Oil, Gas, and Geothermal Resources (DOGGR) as the state’s oil and gas regulator.
- Requires the state’s Oil and Gas Supervisor (Supervisor) to supervise the drilling, operation, maintenance, and abandonment of wells and the operation, maintenance, and removal or abandonment of tanks and facilities attendant to oil and gas production.
- Defines “well” to mean any oil or gas well or well for the discovery of oil or gas; any well on lands producing or reasonably presumed to contain oil or gas; any well drilled for the purpose of injecting fluids or gas for stimulating oil or gas recovery, repressuring or pressure maintenance of oil or gas reservoirs, or disposing of waste fluids from an oil or gas field; any well used to inject or withdraw gas from an underground storage facility; or any well drilled within or adjacent to an oil or gas pool for the purpose of obtaining water to be used in production stimulation or repressuring operations.
- Requires the operator of any well, before commencing the work of drilling the well, to file with the Supervisor a notice of intention (NOI). Requires approval of the NOI by the Supervisor. Authorizes the Supervisor to deny approval of proposed well operations for failure to comply with an order until the operator brings its existing well operations into compliance with the order.
- Allows DOGGR to apply to the United States Environmental Protection Agency (US EPA) to receive “primacy” to operate the Class II Underground Injection Control (UIC) program for oil and gas injection wells at the state level. The US EPA granted primacy and delegated authority to DOGGR to operate the UIC program in 1983.
- Prohibits the unreasonable waste of natural gas by the act, omission, sufferance, or insistence of the lessor, lessee, or operator of any land containing oil or gas, or both.
- Provides that a person who violates the state’s oil and gas laws or regulations is subject to a civil penalty not to exceed $25,000 for each violation. Requires the Supervisor to consider specified circumstances when establishing the amount of the civil penalty such as:
- The extent of harm caused by the violation;
- The persistence of the violation;
- The pervasiveness of the violation; and,
- The number of prior violations by the same violator.
- Authorizes the California Public Utilities Commission (CPUC) to regulate gas corporations, including natural gas storage facilities (Facilities).
- Requires Facilities to receive a Certificate of Public Convenience and Necessity (CPCN) before constructing a Facility. Requires that the CPUC grant a CPCN on the grounds that the present or future public convenience and necessity requires or will require the Facility.
- Requires, pursuant to the California Global Warming Solutions Act (AB 32), the Air Resources Board (ARB) to adopt a statewide greenhouse gas (GHG) emissions limit equivalent to 1990 levels by 2020 and to adopt rules and regulations to achieve maximum technologically feasible and cost-effective GHG emission reductions.
- Requires the Supervisor to continue the prohibition against Southern California Gas Company injecting any natural gas into the Aliso Canyon Facility located in the County of Los Angeles until a comprehensive review of the safety of the gas storage wells at the Facility is completed and the supervisor determines that well integrity has been ensured by the review. Prohibits the Supervisor from lifting the prohibition on injection until the Executive Director of the CPUC has concurred via letter with the Supervisor regarding his or her determination of safety.
- Requires the CPUC, no later than July 1, 2017, to open a proceeding on the feasibility of minimizing or eliminating use of the Aliso Canyon Facility while still maintaining energy and electric reliability for the region.
THIS BILL:
- Requires ARB, in consultation with any local air district and DOGGR, to develop a Facility monitoring program that includes continuous monitoring of ambient concentrations of natural gas at a Facility to identify natural gas leaks. Requires the program to include guidelines for continuous monitoring that include optical gas imaging and accurate quantitative monitoring of natural gas concentrations.
- Requires an operator of a Facility to develop and submit to ARB a facility monitoring plan and the monitoring data.
- Defines “natural gas storage well” as an active or idle natural gas storage well serving or located in a Facility.
- Requires before January 1, 2018, and annually thereafter, all natural gas storage wells to be tested along their entire length for loss of integrity resulting in a leak.
- Requires a natural gas storage well to have an automatic downhole shutoff system (Shutoff System) deployed in order to limit leaks. Requires a Shutoff System to be tested no less than semiannually.
- Requires DOGGR to review and update practices for the use of subsurface safety valves in natural gas storage wells to reflect best practices.
- Requires natural gas storage wells to meet various evaluations, including baseline and follow-on proactive. Requires DOGGR to adopt a schedule for the completion of the evaluations and for the performance of the evaluations. Specifies that the schedule for evaluations be based on risk.
- Requires a natural gas storage well that has lost integrity or that is at risk of loss of integrity to be immediately repaired.
- Requires all natural gas injection and production to be through tubing only and isolated from contact with the well casing. Requires annular pressure and production or injection flow rate to be continuously monitored.
- Defines “sensitive receptor” to include, but not be limited to, schools, hospitals, and residential housing.
- Requires the Office or Environmental Health hazard Assessment (OEHHA) and the State Department of Public Health, in consultation with the DOGGR, to perform a science-based risk assessment of natural gas storage wells to determine the appropriate setback distances for natural gas storage wells. Requires DOGGR to review the assessment and appropriately revise its regulations.
- Requires the operator to submit annually to DOGGR for approval all of the following material:
- A regular maintenance program.
- Design and operating conditions for the well.
- An inspection, leak detection, and monitoring program.
- A site-specific risk management plan which includes the following:
- A protocol for public notice of the leak to the community;
- Prepositioning, as feasible, materials and personnel to respond to a leak;
- A training program for site personnel on how to respond to a leak;
- A plan for corrosion monitoring and evaluation;
- A schedule for regular well and reservoir integrity assessments;
- An assessment of the risks associated with the natural gas storage well and its operation; and,
- Planned risk mitigation efforts.
- A protocol for public notice of the leak to the community;
- A regular maintenance program.
- Declares the public has a right to review the location of a natural gas storage well before its approval.
- Requires notice and preparations for drilling a relief well within 24 hours for a loss of integrity or leak of any size from a natural gas storage well.
- Requires DOGGR to convene an independent panel of recognized experts to develop best practices for Facilities. Requires the panel to look at risk management and automatic shutoff systems, among other topics. Requires DOGGR to review the best practices and incorporate them into their regulations.
- Requires annual inspections of some natural gas storage wells by DOGGR.
- Requires the operator to develop and maintain a comprehensive gas storage well training and mentoring program for their employees.
- Requires all materials provided to DOGGR to comply with this bill be posted on DOGGR’s website. Allows a member of the public to sue DOGGR for not enforcing this bill.
- Establishes minimum of $10,000 per day and maximum of $25,000 per day penalties for the unreasonable waste of natural gas.
FISCAL EFFECT: According to the Senate Appropriations Committee:
First year costs of approximately $4.68 million and ongoing costs of approximately $3.75 million (Oil, Gas and Geothermal Administrative Fund) for DOGGR staffing costs resulting from increased regulatory activities for underground gas storage facilities.
Minor and absorbable costs to the ARB and the CPUC.
Potentially significant costs to OEHHA to conduct risk assessments.
COMMENTS:
- Aliso canyon leak. On October 23, 2015, a natural gas storage well, known as “SS-25” owned by Southern California Gas (SoCalGas) and located in the Aliso Canyon storage field in close proximity to the Porter Ranch neighborhood in Los Angeles County began leaking natural gas. The leak continued until it was initially controlled on February 11, 2016, and the well was successfully sealed on February 18, 2016. During the four months the well leaked, there were numerous attempts to control it. All attempts to stop the leak from the top of the well failed. A relief well was finally able to stop the natural gas leak by plugging the leaking well at its base. According to a recent study, the leak at Aliso Canyon was the largest natural gas leak recorded in the United States, doubling the methane emission rate of the entire Los Angeles basin. Methane is a potent GHG with a global warming potential more than 80 times as powerful as carbon dioxide.
The South Coast Air Quality Management District has received thousands of complaints regarding the odor. Complaints by residents suggest that mercaptans, which are odorants required to be added to natural gas, were present in Porter Ranch at varying levels since the gas leak started. Some people may experience adverse health effects to the strong odors of mercaptans, such as nausea and headaches. In mid-November, the Los Angeles County Department of Public Health, citing public health concerns associated with the use of odorants in the natural gas, ordered SoCal Gas to provide temporary housing relocation assistance to affected residents. Over 8,000 households were relocated due to the leak. Now that the leak has been stopped, residents are returning home, regulators are investigating the cause of the leak, and a comprehensive safety review of the other 114 wells at the field is in progress.
- Natural gas storage facilities. Natural gas providers inject natural gas into large underground reservoirs for storage before later withdrawing the gas for sale during peak load periods. These underground reservoirs often contained oil or gas that has already been extracted. Natural gas providers utilize these facilities to reduce the cost of procurement and to maintain adequate supply of natural gas during peak times. While the CPUC regulates natural gas providers, natural gas transmission lines, and the permitting of Facilities, it is DOGGR that regulates the wells that natural gas is injected into and withdrawn from. Gas storage injection wells are the only type of injection wells in DOGGR’s UIC program that are not part of the primacy agreement with US EPA. DOGGR’s UIC program regulates 14 active gas storage facilities in 12 separate fields across the state to ensure well construction and integrity, appropriateness of the injection site, and zonal isolation of the injections. Each Facility may contain dozens of active gas storage wells. There are 343 active and 85 idle natural gas storage wells in the state. Some natural gas storage facilities have been in operation since the 1940s, and approximately half of the active wells are over 40 years old. Natural gas storage wells vary in construction, depth, design, age, location, and operating conditions. In Aliso Canyon, the wells were drilled in the 1940s for production purposes and then converted into storage wells. The wells at Aliso Canyon do not contain a cement barrier along the entire length of the casing and have had a history of well integrity issues.
- DOGGR’s UIC problems. In 1974, the Safe Drinking Water Act authorized the US EPA to control underground injection to protect underground drinking water sources. In 1982, a primacy agreement was signed that allowed DOGGR to implement the US EPA’s UIC program for oil and gas wells in California. DOGGR’s handling of the portion of the UIC program delegated to it by the US EPA has come under criticism in recent years. A 2011 US EPA audit of DOGGR’s UIC program implementation concluded that DOGGR was misclassifying underground sources of drinking water and doing an insufficient job monitoring the UIC program. In June 2014, it was discovered that DOGGR was approving injection wells in aquifers that were not exempt from the Safe Drinking Water Act. This included injections into aquifers that were not properly exempted, but also included injections into aquifers that were never exempt. California Environmental Protection Agency’s (CalEPA) review found that DOGGR’s district offices were approving projects without review from DOGGR and were making errors identifying the injectable zone of exempt aquifers. This included misidentifying the borders and depth of the aquifer and allowing expansion of productive limits over time beyond boundaries established in the Primacy Application.
SB 83 (Committee on Budget and Fiscal Review), Chapter 24, Statutes of 2015, required the Secretary for Environmental Protection and the Secretary of Natural Resources Agency (NRA) to appoint an independent review panel (Panel), on or before January 1, 2018. The Panel will evaluate the regulatory performance of DOGGR’s administration of the UIC program and to make recommendations on how to improve the effectiveness of the program. The recommendations the Panel can make include: requests for additional resources; needed statutory or regulatory changes; proposals for program reorganization; and, whether to transfer the UIC program to the State Water Resources Control Board. In October 2015, DOGGR released a “Renewal Plan For Oil and Gas Regulation,” which was intended to address concerns over its handling of the UIC program and its regulation of oil and gas in general. The plan called for the review of all injection projects and the review and updating of all UIC regulations. Many of those regulations had not been changed in decades. Concerns have been raised that DOGGR has not required enough inspections, maintenance, or upgrades for older natural gas storage wells to prevent leaks. DOGGR indicates they were already in the process of updating their gas storage regulations when the leak occurred.
- State actions. On January 6, 2016, the Governor issued a proclamation of a state of emergency, which directed several state agencies to act in response to the Aliso Canyon gas leak. These actions included all of the following:
- Direction to DOGGR to continue prohibiting all injections into Aliso Canyon;
- Direction to CPUC and California Energy Commission (CEC) to reduce the pressure of the facility by withdrawing gas;
- Direction to ARB to require real-time monitoring of emissions;
- Direction to OEHHA to review public health concerns, ensure energy and natural gas reliability;
- Direction to DOGGR to promulgate emergency regulations to require new safety and reliability measures for underground natural gas storage facilities; and,
- Direction to DOGGR, CPUC, ARB, and CEC to assess the long-term viability of natural gas storage facilities.
On February 5, 2016, DOGGR established emergency regulations to improve the regulation of gas storage wells. The regulations include the requirement that within six months (August 6) after the regulations become effective, the operator of a gas storage facility to submit a Risk Management Plan to DOGGR to assess the integrity and risk associated with their gas storage project. DOGGR has yet to receive a risk management plan from an operator. DOGGR is working with Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory, and Sandia National Laboratory on its permanent regulations for gas storage wells. A draft of the regulations is expected in July.
- Monitoring. On May 31, 2016, ARB proposed regulations for oil and natural gas facilities that included monitoring requirements. The proposed regulations call for continuous monitoring of the ambient air at the facility and daily or continuous monitoring of each natural gas storage wellhead. The requirements in this bill are largely consistent with ARB’s proposed regulations with one exception. This bill has a specific technology requirement of optical gas imaging. While optical gas imaging provides easily understandable images of leaks, it might not always be appropriate or feasible for every well.
- Shutoff systems. There is much debate about whether automatic downhole shutoff systems (Shutoff Systems) are appropriate in all cases and little evidence about their effectiveness at preventing natural gas storage leaks. However, this bill requires all wells to have Shutoff Systems. Several Shutoff Systems at the McDonald Island gas storage fields and the Los Medanos gas storage field have failed. When Shutoff Systems fail, the operator must remove them from the well to repair them. Pulling the Shutoff System up thousands of feet to the surface may create the potential for damaging the casing or tubing. This bill requires an independent panel of recognized experts to develop best practices for natural gas storage, including for the appropriate use of Shutoff Systems, but then mandates the Shutoff Systems in all cases before the independent panel reviews them. In addition, the bill mandates these devices be installed on January 1, 2017, without a phase-in. This could lead to reliability concerns if hundreds of natural gas storage wells are all being retrofitted to meet the requirements of this bill during winter when natural gas is needed to meet electrical generation and consumer demand for heating.
- Production through the tubing. Most natural gas storage wells produce through tubing and the casing. However, if the casing has integrity issues, the tubing can be isolated from the casing and natural gas can solely be injected and withdrawn from the tubing. If this occurs, anti-corrosive fluids or inert gas is often placed in the casing to further isolate the tubing from the casing. Using only the interior tubing will reduce both injection and withdrawal capacity by approximately 40 to 50%. This bill requires on January 1, 2017, all natural gas storage wells to produce solely through tubing regardless of the casing integrity or whether there is a cement barrier. Some storage fields were designed to only have the wells necessary to meet their delivery needs and would need to drill additional wells if they could only produce through the tubing. The author’s office believes any production through the casing will create wear and tear on the casing and reduce its integrity. However, the drilling of additional wells also poses risks. Should production through the casing be allowed when the well has a second barrier of cementing and is considered low risk? This bill has no requirement for a second cement barrier, which was missing at SS-25. If operators are required to produce only through the tubing, they may not consider a cement barrier as an option to prevent leaks. In addition, requiring all wells to produce through tubing by January 1, 2017, while at the same time requiring them to install Shutoff Systems, would likely dramatically reduce the amount of natural gas that could be delivered.
- Penalties. AB 2756 (Thurmond and Williams, 2016) increases penalties that DOGGR may assess for any violation. This bill also increases penalties, but just for the unreasonable waste of natural gas. These provisions create chaptering issues for both bills. The author’s office has stated the author is willing to work on chaptering issues as the bills move forward.
- Amendments. The author and committee may wish to consider the following amendments:
- Amend definition of “natural gas storage well” to mean an active or idle well used solely to inject gas into or withdraw gas from an underground gas storage facility.
- Amend definition of “sensitive receptor” to mean any residence, including private homes, condominiums, apartments, and living quarters; education resources such as preschools and kindergarten through grade 12 (K-12) schools; daycare centers; and health care facilities such as hospitals or retirement and nursing homes. A sensitive receptor includes long-term care hospitals, hospices, prisons, dormitories, or similar live-in housing.
- Delay effective date for specified requirements of the bill by two and half years for low risk wells. Higher risk wells shall comply with specified requirements in one and half years. If there is an imminent hazard, this does not limit the supervisor’s authority to take action.
- Allow DOGGR to modify requirements for Shutoff Systems and injection/production only through the tubing for low risk non-urban wells.
- Require all new natural gas storage wells to have a cement barrier, as determined by the Supervisor.
- Amend definition of “natural gas storage well” to mean an active or idle well used solely to inject gas into or withdraw gas from an underground gas storage facility.
- Related legislation.
SB 380 (Pavley), Chapter 14, Statutes of 2016, sets in statute criteria for testing and inspection of the natural gas storage wells at the Aliso Canyon facility and required the CPUC and others to study the feasibility of minimizing the use of or shutting down the Aliso Canyon gas storage facility.
AB 1903 (Wilk, 2016) requires a long-term health impact study from the Aliso Canyon gas leak, as specified. This bill is awaiting hearing in the Senate Environmental Quality Committee.
AB 1905 (Wilk, 2016) requires the NRA, on or before July 1, 2017, to complete an independent scientific study on natural gas injection and storage practices and facilities. This bill was held on the suspense file in the Assembly Appropriations Committee.
AB 2756 enhances the DOGGR penalty, shut-in order, and investigation authority. This bill authorizes DOGGR to permit environmentally beneficial projects in lieu of up to 50% of the amount of a civil penalty. This bill is awaiting hearing in the Senate Judiciary Committee.
SB 888 (Allen, 2016) clarifies the role of the California Office of Emergency Services in the event of a gas leak such as the one at Aliso Canyon. This bill establishes the Gas Storage Facility Leak Mitigation account and directs how funds in that account should be spent. This bill is scheduled to be heard in this committee on June 27, 2016.
REGISTERED SUPPORT / OPPOSITION:
Support
American Lung Association in California
Asian Pacific Environmental Network
California Coastal Protection Network
California Public Interest Research Group
California Voices for Progress Education Fund
City of Los Angeles
Center on Race, Poverty & the Environment
Clean Power Campaign
Clean Water Action
Consumer Attorneys of California
Environment California
Environmental Working Group
Los Angeles County Board of Supervisors
Los Angeles County Democratic Party
Los Angeles Unified School District
Los Angeles Unified School District Board of Education
Natural Resources Defense Council
Porter Ranch Neighborhood Council
Santa Susana Mountain Park Association
Sierra Club California
South Coast Air Quality Management District
Voice for Progress
Utility Workers Union of America
19 individuals
Opposition
Central Valley Gas Storage
Gill Ranch Storage
Lodi Gas Storage
Wild Goose Storage
Analysis Prepared by: Michael Jarred / NAT. RES. / (916) 319-2092
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB |
THIRD READING
Bill No: SB 887
:
SENATE NATURAL RES. & WATER COMMITTEE: 7-2, 3/29/16
AYES: Pavley, Allen, Hertzberg, Hueso, Jackson, Monning, Wolk
NOES: Stone, Vidak
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 6-1, 4/20/16
AYES: Wieckowski, Gaines, Hill, Jackson, Leno, Pavley
NOES: Bates
SENATE APPROPRIATIONS COMMITTEE: 5-2, 5/27/16
AYES: Lara, Beall, Hill, McGuire, Mendoza
NOES: Bates, Nielsen
DIGEST: This bill provides a framework for reforming oversight of natural gas storage facilities by, among other things, mandating minimum standards for gas storage well inspections, monitoring, and testing; training of personnel; leak monitoring, planning for emergency response; developing and incorporating best practices into regulations; and an assessment of risk to determine setback distances for gas storage wells.
Existing law:
- Establishes the Division of Oil, Gas and Geothermal Resources (DOGGR) in the Department of Conservation at the Natural Resources Agency. DOGGR is the state’s oil and gas regulator, and DOGGR’s leader is the oil and gas supervisor (supervisor).
- Provides that natural gas storage facilities are subject to the overall jurisdiction of the California Public Utilities Commission (CPUC). Natural gas storage wells and associated piping and equipment are under the jurisdiction of DOGGR.
- Establishes the Air Resources Board (ARB) and the Office of Environmental Health Hazard Assessment (OEHHA) in the California Environmental Protection Agency. ARB has jurisdiction over greenhouse gas emissions and OEHHA’s mission is to protect and enhance public health and the environment by scientific evaluation of risks posed by hazardous substances.
In California, gas storage wells are currently regulated through the state’s underground injection control program. Prior to February 2016, none of these regulations had been updated since 1978.
This bill provides a framework for reforming oversight of natural gas storage facilities by, among other things, mandating minimum standards for gas storage well inspections, monitoring, and testing; training of personnel; leak monitoring, planning for emergency response; developing and incorporating best practices into regulations; and an assessment of risk to determine setback distances for gas storage wells. Specifically, this bill:
- Directs ARB to develop a natural gas storage facility monitoring program, as specified, that includes continuous monitoring of the ambient concentrations of natural gas and may be supplemented by daily leak detection measurements.
- Requires operators of gas storage facilities to develop and submit facility monitoring plans to ARB for review and approval or disapproval.
- Requires monitoring data be provided to ARB and all data provided shall be reported to and posted on-line by DOGGR.
- Requires natural gas storage wells by January 1, 2018 and annually thereafter to be tested for a loss of integrity resulting in a leak, as specified.
- Requires a natural gas storage well to have an automatic downhole shutoff system, including subsurface safety valves, as specified.
- The system shall be tested and results reported semiannually.
- DOGGR shall review and update practices for the use of subsurface safety valves to reflect the best practices determined by independent experts, as specified.
- Requires baseline and follow-on proactive evaluations of the integrity of a natural gas storage well, well casing, and cementing, using best available technology, as specified.
- DOGGR shall develop a schedule for the completion of baseline-proactive testing for all natural gas storage wells by January 1, 2018. DOGGR shall also develop a schedule for the follow-on proactive testing after baseline testing is completed. The interval between tests shall be no more than four years. Wells at high risk of a loss of integrity shall be reevaluated annually.
- Requires gas storage well injection and withdrawal be limited to through the tubing only and annular pressure and production/injection flowrate monitoring be continuous.
- Directs OEHHA to perform a science-based risk assessment of natural gas storage wells with the goal to determine appropriate setback distances for natural gas storage wells from different locations, activities and receptors, as specified. The results of the assessment shall be reported to the Legislature and DOGGR shall review and, as appropriate, incorporate them into regulation.
- Requires the operator of a natural gas storage well to provide to DOGGR for the supervisor’s approval certain programs, as specified. These programs include a maintenance program, design and operating conditions, and a site-specific risk management plan, among others.
- Provides to the public a right to review the location of a natural gas storage well or the conversion of an existing well to gas storage service prior to its approval.
- Requires that in the event of a large ongoing leak, as specified, from a well that preparations for the drilling of a relief well start within 24 hours of the discovery of the leak.
- Requires that DOGGR be notified immediately in the event of a leak from a gas storage well, as specified.
- Requires that DOGGR convene an independent panel of experts to develop best practices for natural gas storage facilities, as specified.
- Requires, where feasible, that DOGGR incorporate federal regulations applicable to gas storage facilities into its regulations.
- Requires enhanced reporting to DOGGR of well operations, as specified.
- Requires DOGGR to perform unannounced random on-site inspections of natural gas storage wells annually, as specified.
- Requires an operator of a natural gas storage well to develop and maintain a comprehensive gas storage well training and mentoring program, as specified.
- Requires DOGGR to post online materials provided to meet these requirements.
- Provides that a member of the public may bring suit for writ of mandate against DOGGR for failure to enforce these requirements.
- Provides additional civil penalties, as specified, for gas storage well violations.
- Makes legislative findings relevant to gas storage wells, including the recent well failure at Aliso Canyon.
Background
On October 23, 2015, a significant leak was discovered from a natural gas storage well in Southern California Gas Company’s (SoCal Gas’) Aliso Canyon storage facility. During the course of the leak, finally officially capped on February 18, 2016, estimates published in the peer-reviewed scientific press indicate almost 100,000 metric tons of the potent greenhouse gas methane were released to the atmosphere. (SoCal Gas recently claimed that the leak released about 84,000 tons of methane, but has not provided any supporting material to justify this claim.) The methane released by the leak estimated to be about 20% of the entire state’s methane emissions over the same time period. Several months after the end of the leak, members of the adjacent community in Porter Ranch and nearby continue to report adverse health impacts to Los Angeles County.
SoCal Gas was unable to “kill” the leaking well on its own and brought in a contractor to continue efforts to control the well. Additional kill attempts were delayed due to the need to bring in specialized equipment. Nearby residents who reported the leak to the local air quality regulator were told by SoCal Gas for several days that “routine maintenance” was responsible. It was only after several days that the serious nature of the leak was revealed to the public. Initial communication and efforts by the operator to serve the community were woefully inadequate. Eventually DOGGR required that a relief well be drilled. The relief well was used to ultimately control the leaking well.
The leak caused major and unprecedented upheaval in the surrounding Porter Ranch community. Over 8,000 households relocated and thousands have had indoor air filters installed. The Los Angeles County Department of Public Health ordered SoCal Gas to provide cleaning services to houses due to the discovery of trace amounts of heavy metals in accumulated household dust.
The leak highlighted the need, long acknowledged by DOGGR, to update its regulations. Numerous reports have raised concerns about the age, operation, maintenance practices and safety of the Aliso Canyon and other gas storage facilities state-wide. DOGGR issued emergency regulations in February specific to natural gas storage wells. A separate regulatory proposal from DOGGR is expected imminently.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
According to the Senate Appropriations Committee, there are the following costs:
- First year costs of approximately $4.68 million and ongoing costs of approximately $3.75 million (Oil, Gas and Geothermal Administrative Fund) for the DOGGR staffing costs resulting from increased regulatory activities for underground gas storage facilities.
- Minor and absorbable costs to the ARB and the CPUC.
- Potentially significant costs to the Office of Environmental Health Hazard Assessment to conduct risk assessments.
American Lung Association in California
Asian Pacific Environmental Network
California Coastal Protection Network
CalPIRG
Center on Race, Poverty & the Environment
Clean Power Campaign
Clean Water Action
Consumer Attorneys of California
Environment California
Environmental Working Group
Los Angeles City Council
Los Angeles County
Los Angeles County Democratic Party
Los Angeles Unified School District
Natural Resources Defense Council
Porter Ranch Neighborhood Council
Scott Schmerelson, LAUSD Board Member, District 3
Sierra Club California
Santa Susana Mountain Parks Association
South Coast Air Quality Management District
Voices for Progress
OPPOSITION: (Verified 5/27/16)
None received
ARGUMENTS IN SUPPORT: According to the author, “a leak like the one in Aliso Canyon must not be allowed to happen again. Thousands of my constituents have had their health or their loved ones’ health affected by the leak. Lives, families, businesses and communities have been disrupted for months. This disruption continues even though the leak was finally stopped in February. We must not allow a rapid return to ‘business-as-usual’ when it comes to the oversight and monitoring of these wells and facilities. We now are aware of the all-too-real risks to public health and the environment posed by natural gas facilities and must ensure meaningful changes occur in their operations.”
“After the leak started, state and local regulators worked diligently to protect the public and stop it. Going forward, it is important that new minimum standards for gas storage wells be set to ensure safe operation, including the development of best practices by experts. SB 887 institutes proactive testing and evaluation of wells to prevent leaks from starting. This is the best method to protect against another disaster on the scale of Aliso Canyon. If a leak does occur, however, new air monitoring requirements will help to identify it quickly. This will help to limit emissions of methane, a potent short-lived climate pollutant, to the atmosphere.”
“When the South Coast Air Quality Management Board went to investigate the facility at Aliso Canyon after the well failure, an additional 15 leaks were found. The CPUC reported that another 200 leaks were found at other gas storage facilities statewide during first quarter testing. Eight of those leaks were serious. These results highlight the need for SB 887 and for better oversight and monitoring.”
“SB 887 also addresses the public communication problems experienced at the start of the Aliso Canyon leak by requiring improved planning and more rapid and complete reporting and dissemination of information to the public.”
5/31/16 20:45:45
**** END ****
SENATE COMMITTEE ON
Senator Ricardo Lara, Chair
2015 - 2016 Regular Session
SB 887 (Pavley) - Natural gas storage wells
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
SB 887 provides a framework for reforming oversight of natural gas storage facilities. The bill mandates minimum standards for equipment inspections, monitoring, and testing; training of personnel; leak monitoring; response planning; reporting; and information sharing. The bill also phases out certain wells, and requires the independent development and incorporation of best practices into regulations, a risk assessment, and penalties for the waste of natural gas.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on May 27, 2016
Fiscal Impact:
First year costs of approximately $4.68 million and ongoing costs of approximately $3.75 million (Oil, Gas and Geothermal Administrative Fund) for the Division of Oil, Gas and Geothermal Resources (DOGGR) staffing costs resulting from increased regulatory activities for underground gas storage facilities.
Minor and absorbable costs to the Air Resources Board (ARB) and the California Public Utilities Commission (CPUC).
Potentially significant costs to the Office of Environmental Health Hazard Assessment to conduct risk assessments.
Author Amendments:
- Removes reference to 10,000 feet setback and revises existing public health risk assessment to focus on evaluating setback distances from wellheads.
- Requires DOGGR to review and update practices for subsurface safety valves.
- Requires DOGGR to develop a schedule for performing follow-on proactive safety evaluations.
- Clarifies annual inspection requirement for leak tests.
- Removes requirement that wells older than an unspecified age be phased out.
- Clarifies which types of leaks trigger relief well provisions.
- Add direction to the existing best practices determination requirement to include risk assessment and automatic shut off systems.
- Clarifies training requirements.
- Makes clarifying, technical changes.
-- END --
SENATE COMMITTEE ON
Senator Ricardo Lara, Chair
2015 - 2016 Regular Session
SB 887 (Pavley) - Natural gas storage wells
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
This bill meets the criteria for referral to the Suspense File.
Bill Summary:
SB 887 provides a framework for reforming oversight of natural gas storage facilities. The bill mandates minimum standards for equipment inspections, monitoring, and testing; training of personnel; leak monitoring; response planning; reporting; and information sharing. The bill also phases out certain wells, and requires the independent development and incorporation of best practices into regulations, a risk assessment, and penalties for the waste of natural gas.
Fiscal Impact:
First year costs of approximately $4.68 million and ongoing costs of approximately $3.75 million (Oil, Gas and Geothermal Administrative Fund) for Department of Conservation (DOC) staffing costs resulting from increased regulatory activities for underground gas storage facilities.
Minor and absorbable costs to the Air Resources Board (ARB) and the California Public Utilities Commission (CPUC).
Background:
- Regulation of natural gas storage wells. Although natural gas storage facilities are subject to the overall utilities jurisdiction of the CPUC, natural gas storage wells and associated piping and equipment fall under the jurisdiction of DOC’s Division of Oil, Gas and Geothermal Resources (DOGGR). Natural gas storage wells represent a small component of the overall Underground Injection Control (UIC) program (approximately 400 wells out of 52,000 statewide), which generally covers permitting, inspection, enforcement, mechanical integrity testing, plugging and abandonment oversight, data management, and public outreach. DOGGR has acknowledged widespread failures in the implementation of its UIC program, and has released a “Renewal Plan” to guide its commitment to reform. DOGGR has received personnel and funding through recent budgets to improve program implementation, data management, enforcement, and other functions.
Aliso Canyon gas leak impacts. On October 23, 2015, Southern California Gas Company (SoCalGas) discovered a significant natural gas leak from “Standard Sesnon 25” (SS 25) well at their Aliso Canyon Natural Gas Storage Facility (Aliso Canyon). The Aliso Canyon is located adjacent to the community of Porter Ranch within the city of Los Angeles. Several days passed before SoCalGas disclosed to the community that a significant uncontrolled leak was occurring. The leak lasted for four months, resulted in the relocation of more than 5,000 households (at SoCal Gas’s expense), and resulted in hundreds of public health complaints. In addition to the public health concerns, ARB’s initial coarse estimates indicate that about 95,000 metric tons of methane was released into the air, adding approximately 20% to the statewide methane emissions during the duration of the leak.
The Administration’s Response. On January 6, 2016, Governor Brown issued a proclamation that declared the Aliso Canyon situation an emergency. The emergency proclamation detailed the administration's efforts to help stop the leak and directed further action to protect public health and safety, ensure accountability, and strengthen oversight of gas storage facilities. The proclamation specifically directed DOGGR to promulgate emergency regulations imposing safety and reliability standards for all underground gas storage facilities in California
Aliso Canyon emergency regulations and subsequent reform and investigation. DOGGR’s emergency regulations for gas storage facilities went into effect in February 2016. These emergency regulations include a number of provisions and require operators to provide complete project data to DOGGR, allow DOGGR to impose pressure limits on projects, require monitoring for annular gas in the well, valve testing, and the use of leak detection technology to monitor wells and equipment and the development of risk management plans. Permanent regulations, which will expand upon the emergency regulation, are expected to be released in the near future.
Proposed Law:
This bill provides a framework for reforming oversight of natural gas storage well facilities, including mandating minimum standards for equipment inspections, monitoring, and testing; training of personnel; leak monitoring; response planning; reporting; and sharing of information. The bill also phases out wells that fall within a new buffer zone around schools and residential housing, and requires the independent development and incorporation of best practices into regulations, a risk assessment, and penalties for the waste of natural gas. More specifically, this bill:
- Requires ARB to develop, with appropriate consultation of the local air district and DOGGR, a natural gas storage facility monitoring program that includes continuous monitoring of ambient natural gas concentrations throughout a natural gas storage facility. The continuous monitoring program may be supplemented by daily leak detection checks;
- Requires operators of a natural gas storage facility to submit proposed plans to implement the program to ARB for approval;
- Requires that monitoring data be provided to ARB, and that DOGGR make available all materials to the public via their website;
- Requires DOGGR, by January 1, 2018, to annually inspect all natural gas storage wells;
- Requires existing natural gas storage wells, as of December 31, 2016, to comply with these requirements by an unspecified future date;
- Requires the phase-out of older wells of unspecified age by an unspecified future date;
- Requires new standards for gas storage wells including, as specified, the use of surface controlled, subsurface safety valves on all wells; evaluation of well integrity using best available technology, a risk assessment interpreting these results, and repair of leaking wells or wells at imminent risk of leaking; annual re-testing of wells at high risk of failure; gas injections and withdrawals limited to tubing only, with no contact with the well casing; continuous well annular pressure and flow rate monitoring; DOGGR approved programs for regular maintenance (including training); design and operation; inspection, leak detection and monitoring; and site specific risk management, as specified, that includes prevention and response protocols to ensure timely public notice, and emergency response and training, among other requirements. Any deviations from approved programs, plans, and other conditions and protocols requires prior written approval from the DOGGR Supervisor; and enhanced reporting of all well-related activities to DOGGR.
- Requires continuous monitoring of ambient concentrations of natural gas and annual proactive evaluations for wells that fall within 10,000 feet of sensitive receptors, defined as schools, hospitals, and residential housing;
- Requires DOGGR to use (a) setbacks from sensitive receptors of unspecified distance when issuing permits, and (b) phase-out, via plugging and abandoning, the use of existing wells violating this provision by an unspecified date;
- Requires public review of the location of a natural gas storage well, either new or to be converted from an existing well, prior to DOGGR approval of the storage well;
- Requires immediate leak notification by operators to DOGGR, and subsequent online dissemination of information by DOGGR to the public within 24 hours of notification, with regular updates thereafter until the leak is stopped;
- Requires starting the process of drilling a relief well within 24 hours of the discovery of a significant leak;
- Requires DOGGR to convene an independent panel of experts to determine best practices for natural gas storage facilities, as specified, to be incorporated into DOGGR’s regulations;
- Requires DOGGR, in consultation with the Office of Environmental Health Hazard Assessment, the Department of Public Health, and the Department of Industrial Relations, to perform a risk assessment of natural gas storage wells, as specified;
- Requires operators to disclose the full history of their wells, including all operations, injections, production, and emplacement of any materials into wells, to DOGGR;
- Requires DOGGR to post all materials submitted in compliance with above provisions 4) through 15) to its website for access by the public;
- Allows the public to bring suit for writ of mandate against DOGGR for failures to enforce provisions 4) through 16); and
- In the event of a leak, provides for existing potential fines to be applied as civil penalties for the unreasonable waste of natural gas, in addition to penalties for other violations.
Related Legislation:
Senate Bills 380, 887, 888, 1383 and 1441 are part of the Senate’s announced bill package to respond to the Aliso Canyon leak.
SB 380 (Pavley, 2015) extends the Administration’s moratorium on injection at the Aliso Canyon facility until the wells are determined to be safe, and is currently before the Assembly Appropriations Committee.
SB 888 (Allen, 2016) establishes the Governor’s Office of Emergency Services as the lead state responder in the event of a natural gas leak and bar leak-related costs from being borne by rate payers, and is currently before the Senate Energy, Utilities, and Commerce Committee.
SB 1383 (Lara, 2016) establishes goals for the emissions of short-lived climate pollutants (including methane), and is currently before Senate Appropriations Committee.
SB 1441 (Leno, 2016) requires vented and fugitive emissions to count against compliance requirements, and is currently before the Senate Environmental Quality Committee.
AB 1882 (Williams, 2016) prevents the approval of underground injection well projects without concurrence of the State Water Resources Control Board, and is currently before the Assembly Appropriations Committee.
AB 1902 (Wilk, 2016) establishes a three-year statute of limitations for Aliso Canyon leak-related civil actions, and is currently before the Assembly Judiciary Committee.
AB 1903 (Wilk, 2016) requires the commission and the Department of Public Health to conduct a long-term health study of the Aliso Canyon leak, and is currently before the Assembly Appropriations Committee.
AB 1904 (Wilk, 2016) requires the Office of Environmental Health Hazard Assessment to undertake a study of odorants, and is currently before the Assembly Appropriations Committee.
AB 1905 (Wilk, 2016) requires an independent science study of natural gas storage facilities, and is currently before the Assembly Appropriations Committee.
AB 2729 (Williams, 2016) revises oil and gas well operations, including idling requirements, and is currently before the Assembly Environmental Safety and Toxic Materials Committee.
AB 2748 (Gatto, 2016) facilitates the claims for property damage stemming from the Aliso Canyon leak, and is currently before the Assembly Judiciary Committee.
AB 2756 (Thurmond, 2016) revises enforcement processes and procedures for oil and gas wells, and is currently before the Assembly Appropriations Committee.
AB 2798 (Gatto, 2016) requires applicants to build new power plants and electric transmission lines to determine the effect of the plant on natural gas storage facilities, and is currently before the Assembly Utilities and Commerce Committee.
SB 248 (Pavley, 2015) requires the division to update it standards, among other provisions, and is currently a two-year bill in the Assembly Appropriations Committee.
Staff Comments:
- Work in progress. SB 887 will require enhanced risk management planning, training of on-site personnel, standards and inspections of equipment, routine emissions monitoring, and overall public transparency. The author notes, though, that the bill is still a work in progress, with several threshold distances, commencement dates, and deadlines still requiring specification. While the author’s intent to revise minimum standards for natural gas storage wells and their operations is evident, the author’s office continues to evaluate, with input from experts and stakeholders, necessary technical specifics, nuances, and implications of certain potential requirements.
2016-17 Budget. The Department of Conservation submitted a Budget Change Proposal (BCP) for FY 2016-17 requesting 20 permanent positions and a baseline appropriation increase of $4,172,000 from the Oil, Gas and Geothermal Administrative Fund the first year and $3,269,000 ongoing. This proposal indicates that the additional staff are necessary to implement increased regulatory activities for underground gas storage facilities resulting from the Governor’s Proclamation and, presumably, the proposed natural gas storage facility regulations (yet to be released).
Potential litigation costs. The bill requires the phasing out of wells placed into service prior to an unspecified year, and the shut-in or denial a permits for projects within an unspecified distance of sensitive receptors. These provisions could result in litigation. According to the Department of Conservation, this type of property rights case would require DOGGR to contract with the Office of the Attorney General. Similar cases have cost between $8,000 and $20,000 per month, with some cases lasting up to one year.
-- END --
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Wieckowski, Chair
2015 - 2016 Regular
Bill No: SB 887
Author: | Pavley | ||
Version: | 3/28/2016 | Hearing Date: | 4/20/2016 |
Urgency: | No | Fiscal: | Yes |
Consultant: | Dan Brumbaugh | ||
SUBJECT: Natural gas storage wells
ANALYSIS:
Existing law:
- Establishes the Division of Oil, Gas and Geothermal Resources (DOGGR) in the Department of Conservation at the Natural Resources Agency. DOGGR is the state’s oil and gas regulator, and the Supervisor of DOGGR has broad authority to oversee oil and gas operations to prevent damage to life, health, property, and natural resources, among other requirements (Public Resources Code §3106).
- Provides the California Air Resources Board (ARB) with primary responsibility for control of mobile sources of air pollution, and for greenhouse gas emissions (Health and Safety Code §39000 et seq. and §39500 et seq.).
- Provides that air pollution control districts (APCDs) and air quality management districts (AQMDs) have primary responsibility for controlling air pollution from stationary sources and non-greenhouse gases (HSC §40000 et seq.).
- Under the California Global Warming Act of 2006 (also known as AB 32, Núñez & Pavley), requires ARB to determine the 1990 statewide greenhouse gas (GHG) emissions level and approve a statewide GHG emissions limit that is equivalent to that level, to be achieved by 2020, and to adopt GHG emissions reductions measures by regulation (HSC §38500 et seq.).
- Requires ARB to develop a comprehensive short-lived climate pollutant strategy by January 1, 2016, in coordination with other state agencies and local air quality management and air pollution control districts (HSC §39730).
- Provides ARB authority for monitoring of air quality from stationary sources including determining “the availability, technological feasibility, and economic reasonableness of monitoring devices to measure and record continuously the emissions concentration and amount of nonmethane hydrocarbons, oxides of nitrogen, oxides of sulfur, reduced sulfur compounds, particulate matter, and carbon monoxide emitted by stationary sources.” ARB shall also “specify the types of stationary sources, processes, and the contaminants, or combinations thereof, for which a monitoring device is available, technologically feasible, and economically reasonable.” (HSC §42700 et seq.)
This bill provides a framework for reforming oversight of natural gas storage well facilities, including mandating minimum standards for equipment inspections, monitoring, and testing; training of personnel; leak monitoring; response planning; reporting; and sharing of information. The bill also phases out wells that fall within a new buffer zone around schools and residential housing, and requires the independent development and incorporation of best practices into regulations, a risk assessment, and penalties for the waste of natural gas. More specifically, this bill:
- Requires ARB to develop, with appropriate consultation of the local air district and DOGGR, a natural gas storage facility monitoring program that includes continuous monitoring of ambient natural gas concentrations throughout a natural gas storage facility. The continuous monitoring program may be supplemented by daily leak detection checks;
- Requires operators of a natural gas storage facility to submit proposed plans to implement the program to ARB for approval;
- Requires that monitoring data be provided to ARB, and that DOGGR make available all materials to the public via their website;
- Requires DOGGR, by January 1, 2018, to annually inspect all natural gas storage wells;
- Requires existing natural gas storage wells, as of December 31, 2016, to comply with these requirements by an unspecified future date;
- Requires the phase-out of older wells of unspecified age by an unspecified future date;
- Requires new standards for gas storage wells including, as specified, the use of surface controlled, subsurface safety valves on all wells; evaluation of well integrity using best available technology, a risk assessment interpreting these results, and repair of leaking wells or wells at imminent risk of leaking; annual re-testing of wells at high risk of failure; gas injections and withdrawals limited to tubing only, with no contact with the well casing; continuous well annular pressure and flow rate monitoring; DOGGR approved programs for regular maintenance (including training); design and operation; inspection, leak detection and monitoring; and site specific risk management, as specified, that includes prevention and response protocols to ensure timely public notice, and emergency response and training, among other requirements. Any deviations from approved programs, plans, and other conditions and protocols requires prior written approval from the DOGGR Supervisor; and enhanced reporting of all well-related activities to DOGGR.
- Requires continuous monitoring of ambient concentrations of natural gas and annual proactive evaluations for wells that fall within 10,000 feet of sensitive receptors, defined as schools, hospitals, and residential housing;
- Requires DOGGR to use (a) setbacks from sensitive receptors of unspecified distance when issuing permits, and (b) phase-out, via plugging and abandoning, the use of existing wells violating this provision by an unspecified date;
- Requires public review of the location of a natural gas storage well, either new or to be converted from an existing well, prior to DOGGR approval of the storage well;
- Requires immediate leak notification by operators to DOGGR, and subsequent online dissemination of information by DOGGR to the public within 24 hours of notification, with regular updates thereafter until the leak is stopped;
- Requires starting the process of drilling a relief well within 24 hours of the discovery of a significant leak;
- Requires DOGGR to convene an independent panel of experts to determine best practices for natural gas storage facilities, as specified, to be incorporated into DOGGR’s regulations;
- Requires DOGGR, in consultation with the Office of Environmental Health Hazard Assessment, the Department of Public Health, and the Department of Industrial Relations, to perform a risk assessment of natural gas storage wells, as specified;
- Requires operators to disclose the full history of their wells, including all operations, injections, production, and emplacement of any materials into wells, to DOGGR;
- Requires DOGGR to post all materials submitted in compliance with above provisions 4) through 15) to its website for access by the public;
- Allows the public to bring suit for writ of mandate against DOGGR for failures to enforce provisions 4) through 16); and
- In the event of a leak, provides for existing potential fines to be applied as civil penalties for the unreasonable waste of natural gas, in addition to penalties for other violations.
Background
- Regulation of natural gas storage wells. Although natural gas storage facilities are subject to the overall utilities jurisdiction of the California Public Utilities Commission (CPUC), natural gas storage wells and associated piping and equipment are under the jurisdiction of DOGGR. Natural gas storage wells represent a small component of the overall Underground Injection Control (UIC) program (approximately 400 wells out of 52,000 statewide), which generally covers permitting, inspection, enforcement, mechanical integrity testing, plugging and abandonment oversight, data management, and public outreach. DOGGR has acknowledged widespread failures in the implementation of its UIC program, and has released a “Renewal Plan” to guide its commitment to reform. DOGGR has received personnel and funding through recent budgets to improve program implementation, data management, enforcement and other functions.
Pursuant to UIC regulation, an operator wishing to drill gas storage wells would have to provide certain information about the proposed reservoir to the division for approval. If approved, DOGGR would issue a “project approval letter” setting specific requirements (e.g., maximum storage pressure) for the wells. The project approval letters for the 14 natural gas storage facilities in California include a wide variety of requirements and are not generally available online to the public. Additionally, while required by regulation, it is not clear what further review, absent litigation, the project approval conditions received after initial issuance.
After a project approval letter is issued, the operator would still be required to obtain an approved permit for each individual well serving the reservoir. In addition, “field rules” may be established for a reservoir that also set requirements for wells.
- The catastrophic leak at Aliso Canyon and its local impacts. On October 23, 2015, Southern California Gas Company (SoCalGas) discovered a significant natural gas leak from “Standard Sesnon 25” (SS 25) well at their Aliso Canyon Natural Gas Storage Facility. This well was originally drilled in 1954 for oil and gas production and was subsequently converted to a natural gas storage well. SoCalGas was aware of increasing well integrity problems at Aliso Canyon and had proposed a Storage Integrity Management Program (SIMP) to the CPUC involving 18 wells drilled from 1943-1955 and later converted in the 1970s to gas storage wells (as with SS 25). SS 25, however, was not one of those wells designated in the program.
The Aliso Canyon gas storage facility is located adjacent to the community of Porter Ranch within the city of Los Angeles. Some wells at the Aliso Canyon facility are less than one mile away from homes, although SS 25 was approximately 1-1/2 miles away from the nearest home. The local air quality management district began receiving complaints about the smell (from added mercaptin odorants) the next day. Several days passed before SoCalGas acknowledged to the community that a significant uncontrolled leak was occurring.
While SoCalGas called in both DOGGR and contracted with experts to stop the leak quickly, contemporaneous news reports indicate considerable missteps in public communication and initial efforts to relocate members of the community (at SoCalGas’s expense).
The DOGGR Supervisor issued two orders to SoCalGas related to leak response and the Governor issued a State of Emergency proclamation on January 6, 2016. Drilling a relief well in combination with reducing the pressure in the reservoir ultimately allowed for the leaking well to be brought under control and DOGGR confirmed this on February 18, 2016. Over 5,000 households were relocated during the leak, two public schools were moved, and hundreds of public health complaints were logged by the County.
- Climate impacts from the Aliso Canyon leak. In addition to the public health concerns, ARB’s initial coarse estimates of the amount of methane released, based on repeated aerial sampling, are about 95,000 metric tons. According to ARB, the leak added approximately 20% to the statewide methane emissions during its duration. SoCalGas is in the process of conducting their own analysis of lost gas based on changes in the volume of natural gas within the reservoir. Natural gas (methane) is a potent short-lived climate pollutant (SLCP), which has about 84 times more greenhouse warming potential (GWP) per kilogram over a 20-year time frame than carbon dioxide.
On December 18, 2015, SoCalGas issued a press release stating that it “recognizes the impact this incident is having on the environment. …we intend to mitigate environmental impacts from the actual natural gas released from the leak and will work with state officials to develop a framework that will help us achieve this goal.” Subsequent statements by SoCalGas reiterated this commitment.
Governor Brown’s State of Emergency proclamation directed the state to develop a program to fully mitigate the leak’s emissions of methane, with priority on projects that reduce short-lived climate pollutants. ARB issued the Aliso Canyon Methane Leak Climate Impacts Mitigation Program on March 31, 2016. This plan provided a rationale that full mitigation of the impacts of the Aliso Canyon requires an emphasis on ton-for-ton reductions of methane rather than other greenhouse gases, and that the GWP of the leaked methane is best estimated using the 20-year time frame. As stated in ARB’s new Proposed Short-Lived Climate Pollutant Reduction Strategy (April 2016), “the use of GWPs with a time horizon of 20 years better captures the importance of the SLCPs and gives a better perspective on the speed at which SLCP emission controls will impact the atmosphere relative to CO2 emission controls.”
Just a week prior to the Mitigation Program’s release, however, SoCalGas issued a letter to ARB stating that its mitigation requirement is entirely voluntary and that for its mitigation, it will use a more drawn out and less stringent 100-year time frame better suited for estimating the global warming potential of CO2 rather than methane. Over the 100-year period, because it is atmospherically potent but short-lived, methane has 28 times more GWP per kilogram than carbon dioxide (versus 84 times over 20 years), so the use of this metric allows SoCalGas to justify a smaller, cheaper mitigation program than would otherwise occur if the more methane-appropriate metric were used.
Although Proposed Short-Lived Climate Pollutant Reduction Strategy states that ARB is developing and implementing rules “to limit methane leaks from the oil and gas production, processing, and storage sector, and from the natural gas pipeline system,” fugitive emissions from these sources are currently not directly regulated by ARB.
- Aliso Canyon emergency regulations and subsequent reform and investigation. DOGGR released emergency regulations for gas storage wells during the leak which went into effect in February 2016. These emergency regulations include a number of provisions and require operators to provide complete project data to DOGGR, allow DOGGR to impose pressure limits on projects, require monitoring for annular gas in the well, valve testing, the use of leak detection technology to monitor wells and equipment and the development of risk management plans.
DOGGR, in consultation with independent experts from national laboratories, released a Comprehensive Safety Review of Aliso Canyon. The safety review requires temperature and noise logs to check for existing leaks on all wells. Following a review of these logs (and any necessary remediation), wells will either go through an additional four tests to return to service, be temporarily plugged-and-abandoned, or permanently plugged-and-abandoned. The four additional tests that must be successfully completed include a casing thickness evaluation, a cement bond log, a multi-caliper arm evaluation and a pressure test. These are proactive tests to evaluate the risk of well integrity failure during operation. Additionally future withdrawals at the facility will be through tubing and packer only to protect the integrity of the casing. DOGGR issued an order on March 4, 2016 to SoCalGas regarding the steps necessary to complete the comprehensive safety review.
The CPUC and DOGGR are currently investigating the causes of the leak at Aliso Canyon. A preliminary report is not expected for several months at the earliest. SoCalGas has also contracted with Blade Energy Partners (Frisco, Texas) for a “root-cause” analysis of the leak, which may be released by the fall.
Comments
- Purpose of Bill.
According to the author, “a leak like the one in Aliso Canyon must not be allowed to happen again. Thousands of my constituents have had their health or their loved ones’ health affected by the leak. Lives, families, businesses and communities have been disrupted for months. This disruption continues even though the leak was finally stopped in February. We must not allow a rapid return to ‘business-as-usual’ when it comes to the oversight and monitoring of these wells and facilities. We now are aware of the all-to-real risks to public health and the environment posed by natural gas facilities and must ensure meaningful changes occur in their operations.”
“After the leak started, state and local regulators worked diligently to protect the public and stop it. Going forward, it is important that new minimum standards for gas storage wells be set to ensure safe operation, including the development of best practices by experts. SB 887 institutes proactive testing and evaluation of wells to prevent leaks from starting. This is the best method to protect against another disaster on the scale of Aliso Canyon. If a leak does occur, however, new air monitoring requirements will help to identify it quickly. This will help to limit emissions of methane, a potent short-lived climate pollutant, to the atmosphere.”
“When the South Coast Air Quality Management Board went to investigate the facility at Aliso Canyon after the well failure, an additional 15 leaking pieces of equipment were found. The CPUC just reported that another 200 leaks were found at other gas storage facilities statewide during testing required following Aliso Canyon. Eight of those leaks were serious. These results highlight the need for SB 887 and for better oversight and monitoring.”
“SB 887 also addresses the public communication problems experienced at the start of the Aliso Canyon leak by requiring improved planning and more rapid and complete reporting and dissemination of information to the public.”
- Work in progress. SB 887 will require enhanced risk management planning, training of on-site personnel, standards and inspections of equipment, routine emissions monitoring, and overall public transparency. The author notes, though, that the bill is still a work in progress, with several threshold distances, commencement dates, and deadlines still requiring specification. While the author’s intent to revise minimum standards for natural gas storage wells and their operations is evident, the author’s office continues to evaluate, with input from experts and stakeholders (e.g., the concerns raised by independent gas storage operators mentioned below), necessary technical specifics, nuances, and implications of certain potential requirements.
In addition to its new emergency regulations, DOGGR has recently released a pre-rulemaking discussion document for gas storage operations that goes beyond the material included in emergency regulations. The author’s office is also continuing to discuss how to incorporate DOGGR’s existing and proposed regulations, the approaches of other states, and industry recommended practices into an appropriate statutory framework.
- Concerns raised by independent natural gas storage operators. Three independent storage providers (ISPs) jointly expressed numerous concerns regarding this bill. Specifically, the ISPs noted their facilities are located in rural areas, their wells are designed specifically for natural gas storage and are typically of newer construction (1999-2012) and therefore “represent the best well technology and design for our individual geologic and geographic conditions.” There are also no co-located oil and gas production wells that could present risks to the gas storage wells. Last, ISPs, unlike the natural gas distribution utilities, do not have any captive rate base for cost recovery, so the owners are wholly at risk, and their rates are market-based. In general, the ISPs support site-specific, risk-based assessments and emphasize that each storage facility and its wells present a unique situation. They also note their commitment to safety and the potential risks of leaks associated with the repeated “downhole operations,” including casing inspection logging, visual and corrosive logging, and the placement and maintenance of subsurface safety valves. The author’s office reports continuing to work to address these issues.
- Strengthening risk management. SB 887 proposes to better manage the risk of leaks from natural gas storage facilities in a number of important ways, though there is opportunity to strengthen some of the pieces.
- The bill currently requires a one-time independent expert review panel to develop best practice recommendations regarding natural gas storage facility regulations (proposed §3140). As technology and experience with that technology evolves, however, so should the best practices. The bill should require DOGGR to periodically review and update, if necessary, how their regulations incorporate best practices. An amendment is therefore needed to require that DOGGR periodically review and update, when necessary, current best practices and how these should be incorporated into their regulations.
- Further policy questions. The immensity of the environmental impacts from the Aliso Canyon leak, as well as the human displacement and health effects, highlight the enormous risks associated with some natural gas storage facilities. Other natural gas storage facilities, presumably due to some combination of smaller size, more advanced technology, different geological formations, etc., would likely fall somewhere lower on the risk gradient. Such a range of characteristics and associated risks raise questions about minimal standards that all facilities should face, as well as higher standards that higher risk facilities should face.
SB 887 bill requires at least annual re-testing of natural gas storage wells found to be at high risk of a loss of integrity (proposed §3134(b)), though what constitutes high risk is not specified, which in turn raises questions regarding how precautionary the provision is. For example, for wells at a “high risk of failure,” is annual re-testing too infrequent, too frequent, or just right?
SB 887 mandates that DOGGR, in consultation other relevant agencies, perform a risk assessment of natural gas storage wells (proposed §3141). SB 887 currently emphasizes across-the-board minimal standards for all storage facilities. A complementary approach would be to take better advantage of the planned risk analyses, and require storage facilities with greater risks to have greater safety and environmental requirements than lower risk storage facilities. Under such a scenario, very large facilities like Aliso Canyon that present substantially greater risk of catastrophic emissions than do smaller storage facilities would face greater precautionary requirements.
As the bill moves forward, the author may wish to continue considering how to craft an approach where the pro-active, precautionary requirements scale across categories of risk for both individual wells and whole storage facilities sharing the same reservoirs.
Related/Prior Legislation
Senate Bills 380, 887, 888, 1383 and 1441 are part of the Senate’s announced bill package to respond to the Aliso Canyon leak.
SB 380 (Pavley, 2015) extends the Administration’s moratorium on injection at the Aliso Canyon facility until the wells are determined to be safe, and is currently before the Assembly Appropriations Committee.
SB 888 (Allen, 2016) establishes the Governor’s Office of Emergency Services as the lead state responder in the event of a natural gas leak and bar leak-related costs from being borne by rate payers, and is currently before the Senate Energy, Utilities, and Commerce Committee.
SB 1383 (Lara, 2016) establishes goals for the emissions of short-lived climate pollutants (including methane), and is currently before Senate Appropriations Committee.
SB 1441 (Leno, 2016) requires vented and fugitive emissions to count against compliance requirements, and is currently before the Senate Environmental Quality Committee.
AB 1882 (Williams, 2016) prevents the approval of underground injection well projects without concurrence of the State Water Resources Control Board, and is currently before the Assembly Appropriations Committee.
AB 1902 (Wilk, 2016) establishes a three-year statute of limitations for Aliso Canyon leak-related civil actions, and is currently before the Assembly Judiciary Committee.
AB 1903 (Wilk, 2016) requires the commission and the Department of Public Health to conduct a long-term health study of the Aliso Canyon leak, and is currently before the Assembly Appropriations Committee.
AB 1904 (Wilk, 2016) requires the Office of Environmental Health Hazard Assessment to undertake a study of odorants, and is currently before the Assembly Appropriations Committee.
AB 1905 (Wilk, 2016) requires an independent science study of natural gas storage facilities, and is currently before the Assembly Appropriations Committee.
AB 2729 (Williams, 2016) revises oil and gas well operations, including idling requirements, and is currently before the Assembly Environmental Safety and Toxic Materials Committee.
AB 2748 (Gatto, 2016) facilitates the claims for property damage stemming from the Aliso Canyon leak, and is currently before the Assembly Judiciary Committee.
AB 2756 (Thurmond, 2016) revises enforcement processes and procedures for oil and gas wells, and is currently before the Assembly Appropriations Committee.
AB 2798 (Gatto, 2016) requires applicants to build new power plants and electric transmission lines to determine the effect of the plant on natural gas storage facilities, and is currently before the Assembly Utilities and Commerce Committee.
SB 248 (Pavley, 2015) requires the division to update it standards, among other provisions, and is currently a two-year bill in the Assembly Appropriations Committee.
DOUBLE REFERRAL:
This measure was heard in the Senate Natural Resources and Water Committee on March 29, 2015, and passed out of committee with a vote of 7-2.
SOURCE:
Senator Pavley
SUPPORT:
American Lung Association in California
Asian Pacific Environmental Network
California Coastal Protection Network
CalPIRG
Clean Water Action
Consumer Attorneys of California
Environment California
Los Angeles County Board of Supervisors
Los Angeles Unified School District
Natural Resources Defense Council
Porter Ranch Neighborhood Council
Scott Schmerelson, LAUSD Board Member, District 3
Sierra Club California
Santa Susana Mountain Park Association
South Coast Air Quality Management District
OPPOSITION:
None received
ARGUMENTS IN SUPPORT:
According to the Consumer Attorneys of California, SB 887 seeks to prevent future natural gas leaks by “setting new minimum standards for natural gas storage wells including annual inspections, mandatory setbacks from homes and schools, stricter requirements near homes and schools, subsurface safety valves, regular proactive and quantitative evaluations of well integrity, continuous well operation and air quality monitoring, and limiting production and injection to well tubing only, among others. It would also require the phase-out of old wells and require existing wells comply with SB 887’s requirements in the future. The bill would also… increase penalties for wasting gas to $10,000 - $25,000 per violation per day, among other robust consumer protection measures.”
CalPIRG writes that “this bill requires oversight agencies to convene a panel of independent experts to develop best practices for natural gas storage, perform a risk assessment of natural gas wells and report findings to the Legislature, annually inspect all gas storage wells, and enforce prescribed safety standards. The bill also requires the State Air Resources Board to develop guidelines for a monitoring program to track ambient concentrations of natural gas around facilities to identify leaks faster.”
A letter from a number of environmental and public health organizations notes that “This bill also provides greater transparency by requiring utilities to disclose all well-related operations and activities to DOGGR. It also requires that the proposed methane gas well location be publically reviewed before DOGGR can permit digging. Most importantly, it requires utilities to notify DOGGR of leaking wells immediately and DOGGR must post leaking well information and all gas storage well materials online.”
-- END --
SENATE COMMITTEE ON NATURAL RESOURCES AND WATER
Senator Fran Pavley, Chair
2015 - 2016 Regular
Bill No: SB Hearing Date: March 29, 2016
Author: | Pavley | ||
Version: | March 28, 2016 | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Katharine Moore | ||
Subject: Natural gas storage wells
BACKGROUND AND EXISTING LAW
Existing law establishes the Division of Oil, Gas and Geothermal Resources (division) in the Department of Conservation at the Natural Resources Agency. The division is the state’s oil and gas regulator.
Existing law provides the division’s leader, the state’s oil and gas supervisor (supervisor), with broad authority to supervise oil and gas operations to prevent damage to life, health, property and natural resources, among other requirements (see Public Resources Code (PRC) §3106).
While natural gas storage facilities are subject to the overall jurisdiction of the California Public Utilities Commission (commission), natural gas storage wells and associated piping and equipment are under the jurisdiction of the division.
In California, gas storage wells are regulated through the state’s underground injection control (UIC) program (see Title 14, Code of California Regulations, §§1724.6 – 1724.10, (14 CCR §§1724.6 – 1724.10)). The principal regulation specific to gas storage wells is 14 CCR §1724.8. Prior to February 2016, none of these regulations had been updated since 1978.
Natural gas storage wells represent a small component of the overall UIC program (approximately 400 wells out of 50,000 statewide). The division has acknowledged widespread failures in the implementation of its UIC program (see, for example, the review of the division’s Cypress (Los Angeles) district office released in October 2015), although how the regulation of gas storage wells was affected by this remains unclear. At the same time the Cypress report was released, the division released a “Renewal plan” to guide its commitment to reform. The division has received personnel and funding through recent budgets to improve program implementation, data management, enforcement and other functions.
Pursuant to regulation, an operator wishing to drill gas storage wells would have to provide certain information about the proposed reservoir to the division for approval. If approved, the division would issue a “project approval letter” setting specific requirements (e.g. maximum storage pressure) for the wells. The 14 project approval letters for natural gas storage facilities in California include a wide variety of requirements and are not generally available online to the public. Additionally, while required by regulation, it is not clear – as the dates of the letters span decades – what further review, absent litigation, the project approval conditions received after initial issuance.
After a project approval letter is issued, the operator would still be required to obtain an approved permit for each individual well serving the reservoir. Additionally, “field rules” may be established for a reservoir that also set requirements for wells.
On October 23, 2015, efforts started to stop a significant natural gas leak from the “Standard Sesnon 25” gas storage well located at the Southern California Gas Company’s (SoCal Gas’) Aliso Canyon gas storage well facility. This well was originally drilled in 1954 for oil and gas production and subsequently converted to a natural gas storage well. While SoCal Gas was aware of increasing well integrity problems at Aliso Canyon and had proposed a still-pending-before-the-commission Storage Integrity Management Program (SIMP) for implementation, the leaking well was not one of those designated for the program. The 18 wells proposed for SIMP were all originally drilled from 1943 – 1955 and later converted in the 1970s to gas storage wells.
The Aliso Canyon gas storage facility is located adjacent to the community of Porter Ranch in Los Angeles County. Some wells at the Aliso Canyon facility appear to be less than one mile away from homes, although the well that failed was approximately 1-1/2 miles away from the nearest home. The local air quality management district began receiving complaints about the smell (from added odorants) the next day. Several days passed before SoCal Gas acknowledged to the community that a significant uncontrolled leak was occurring.
While SoCal Gas called in both the division and contracted with experts to stop the leak quickly, contemporaneous news reports indicate considerable missteps in public communication and initial efforts to relocate members of the community (at SoCal Gas’ expense).
The supervisor issued two orders to SoCal Gas related to leak response and the Governor issued a State of Emergency proclamation on January 6, 2016. Drilling a relief well in combination with reducing the pressure in the reservoir ultimately allowed for the leaking well to be brought under control and the division confirmed this on February 18, 2016. Over 5,000 households were relocated during the leak, two public schools were moved and hundreds of public health complaints were logged by the County. In addition to the public health concerns, the amount of methane released has been estimated to be about 100,000 metric tons, fully 20% of the state’s methane emissions over the four months of the leak. Natural gas (methane) is a potent greenhouse gas and a short-lived climate pollutant.
The division released emergency regulations for gas storage wells during the leak which went into effect in February. These emergency regulations include a number of provisions and require operators to provide complete project data to the division, put in regulation the division’s ability to impose pressure limits on projects, require monitoring for annular gas in the well, valve testing, the use of leak detection technology to monitor wells and equipment and the development of risk management plans.
Existing law establishes the Air Resources Board (board) in the California Environmental Protection Agency. The board has jurisdiction over greenhouse gas emissions.
PROPOSED LAW
This bill would comprehensively reform natural gas storage well standards and develop information specific to natural gas storage well operations necessary to understand and prevent risks to safety.
Specifically this bill would:
- Require the board to develop, with appropriate consultation, a natural gas storage facility monitoring program that includes continuous monitoring of ambient natural gas concentrations and may include daily leak detection checks, as specified.
- Require operators to submit proposed plans to implement the program to the board for approval.
- Require the division to annually inspect all natural gas storage wells.
- Require existing natural gas storage wells to comply with these requirements by a future date.
- Require the phase-out use of older wells of unspecified age by a future date.
- Require new standards for gas storage wells including:
- The use of subsurface safety wells on all wells, as specified.
- Proactive evaluation of well integrity using best available technology, a risk assessment interpreting these results, and repair of leaking wells or wells at imminent risk of leaking, as specified.
- Annual re-testing of wells at high risk of failure.
- Gas injections and withdrawals limited to tubing and packer only.
- Continuous well annular pressure and flow rate monitoring, as specified.
- Approved programs for regular maintenance (including training); design and operation; inspection, leak detection and monitoring; and site specific risk management, as specified, that includes prevention and response protocols to ensure timely public notice, and emergency response and training, among other requirements.
- Enhanced reporting of all well-related activities to the division.
- Within 10,000 feet of sensitive receptors, as defined, require continuous monitoring of ambient concentrations of natural gas and annual proactive evaluations for wells.
- Set setbacks from sensitive receptors of undetermined distance, and phase-out the use of wells violating this provision, as specified.
- Require immediate leak notification to the division with follow-on dissemination of information requirements for the division.
- Require starting the process of drilling a relief well within 24 hours of the start of a significant leak.
- Require the division to convene an independent panel of experts to determine best practices for natural gas storage facilities, as specified, to be incorporated into the division’s regulations.
- Require the division to perform a risk assessment of natural gas storage wells, as specified.
- Provide for an increase in the amount of potential fines in the event of a leak.
- Require submittal of monitoring and other data to the appropriate state agencies with subsequent posting online for the public, as specified.
In addition, the bill would provide the public with a right to review the location of a well and a right to take action against the division for failing to enforce these requirements. Finally, the bill would make appropriate and supporting legislative findings particularly regarding ensuring the safety of natural gas storage well operations.
ARGUMENTS IN SUPPORT
According to the author, “a leak like the one in Aliso Canyon must not be allowed to happen again. Thousands of my constituents have had their health or their loved ones’ health affected by the leak. Lives, families, businesses and communities have been disrupted for months and this disruption continues even though the leak was finally stopped last month. We must not allow a rapid return to “business-as-usual.” We now are aware of the all-to-real risks to public health and the environment posed by natural gas facilities and must ensure meaningful changes occur in their operations.”
“State and local regulators worked diligently to protect the public and stop the leak. Going forward, it is important that new minimum standards for gas storage wells be set to ensure safe operations, including the development of best practices by experts. New air monitoring requirements will help to identify leaks early. SB 887 will also ensure a rapid response to stop a leak and proactive testing and evaluation of wells to prevent a leak from even starting. SB 887 also addresses the public communication problems experienced at the start of the Aliso Canyon leak by requiring improved planning and more rapid and complete reporting and dissemination of information to the public.”
ARGUMENTS IN OPPOSITION
None received
COMMENTS
Double-referral. This bill is double-referred to this Committee and to the Senate Environmental Quality Committee (Senate EQ). Parts of this bill subject to Senate EQ’s jurisdiction and included here for context and completeness.
Work-in-progress. This bill is a work-in-progress. While the author’s intent to revise minimum standards for natural gas storage wells and their operations is evident, necessary technical specifics and the nuances and implications of certain potential requirements continue to be evaluated by the author’s office with input from experts and stakeholders (see, for example, the concerns raised by independent gas storage operators detailed below). In addition to its new emergency regulations, the division has recently released a pre-rulemaking discussion document for gas storage operations that goes beyond the material included in emergency regulations. The author’s office may further consider how to incorporate the division’s existing and proposed regulations, the approaches of other states, and industry recommended practices into an appropriate statutory framework. The Committee may wish to direct staff to continue working with the author’s office as the bill progresses.
Concern raised by independent gas storage facility operators. Three independent gas storage facility operators writing jointly expressed numerous concerns regarding this bill. Specifically, the operators noted that the seasonality of their operations and their business can be markedly different from those of public utilities. In addition, their facilities are located in rural areas, their wells are designed specifically for natural gas storage and are typically newer construction, and there are no co-located oil and gas production wells that could present risks to the gas storage wells. In general, the operators supported site-specific risk-based assessments and emphasized that each storage facility and its wells present a unique situation. They also noted their commitment to safety and the potential risks associated with repeated “downhole” operations.
Aliso Canyon safety criteria. The division, in consultation with independent experts from national laboratories, released a comprehensive safety review plan for Aliso Canyon. The safety review requires temperature and noise logs to check for existing leaks on all wells serving the facility (approximately 115). Following a review of these logs (and any necessary remediation), wells will either go through an additional four tests to return to service, be temporarily plugged-and-abandoned or permanently plugged-and-abandoned. The four additional tests that must be successfully completed include a casing thickness evaluation, a cement bond log, a multi-caliper arm evaluation and a pressure test. These are proactive tests to evaluate the risk of well integrity failure during operation. Additionally future withdrawals at the facility will be through tubing and packer only to protect the integrity of the casing. The division issued an order on March 4, 2016 to SoCal Gas regarding the steps necessary to complete the comprehensive safety review.
Investigation of the Aliso Canyon leak. The commission and the division are currently investigating the causes of the leak at Aliso Canyon. A preliminary report is not expected for several months at the earliest. A “root cause” analysis of the leak by a third party will likely be released earlier (possibly by the fall).
Committee oversight/informational hearing. This Committee will be holding an oversight/informational hearing on natural gas storage well safety in the near future.
Recent related legislation
Senate Bills 380, 887, 888, 1383 and 1441 are part of the Senate’s announced bill package to respond to the Aliso Canyon leak.
AB 1902 (Wilk, 2016) would establish a 3 year statute of limitations for Aliso Canyon leak-related civil actions (before the Assembly Judiciary Committee).
AB 1903 (Wilk, 2016) would require the commission and the Department of Public Health to conduct a long-term health study of the Aliso Canyon leak (before the Assembly Utilities and Commerce Committee).
AB 1904 (Wilk, 2016) would require the Office of Environmental Health Hazard Assessment to undertake a study of odorants (before the Assembly Environmental Safety and Toxic Materials Committee).
AB 1905 (Wilk, 2016) would require an independent science study of natural gas storage facilities (before the Assembly Natural Resources Committee).
AB 2729 (Williams, 2016) would revise oil and gas well operations, including idling requirements (before the Assembly Natural Resources Committee).
AB 2748 (Gatto, 2016) would facilitate the claims for property damage stemming from the Aliso Canyon leak (before the Assembly Judiciary Committee).
AB 2756 (Thurmond, 2016) would revise enforcement processes and procedures for oil and gas wells (before the Assembly Natural Resources Committee).
AB 2798 (Gatto, 2016) would require applicants to build new power plants and electric transmission lines to determine the effect of the plant on natural gas storage facilities (before the Assembly Utilities and Commerce Committee).
SB 380 (Pavley, 2016) would extend the Administration’s moratorium on injection at the Aliso Canyon facility until the wells are determined to be safe (before the Assembly Appropriations Committee).
SB 888 (Allen, 2016) would establish the Governor’s Office of Emergency Services as the lead state responder in the event of a natural gas leak and bar leak-related costs from being borne by rate payers (before the Senate Energy Committee).
SB 1383 (Lara, 2016) would establish goals for the emissions of short-lived climate pollutants (including methane) (before Senate EQ).
SB 1441 (Leno, 2016) would require vented and fugitive emissions to count against compliance requirements (before the Senate Energy Committee).
SB 248 (Pavley, 2015) would require the division to update it standards, among other provisions (2 year bill in the Assembly Appropriations Committee).
SUPPORT
American Lung Association in California
Asian Pacific Environmental Network
California Coastal Protection Network
CalPIRG
Clean Water Action
Consumer Attorneys of California
Environment California
Natural Resources Defense Council
Porter Ranch Neighborhood Council
Scott Schmerelson, LAUSD Board Member, District 3
Sierra Club California
Santa Susana Mountain Parks Association
South Coast Air Quality Management District
OPPOSITION
None Received
-- END --
Discussed in Hearing
Senate Floor
Assembly Floor
Assembly Standing Committee on Natural Resources
Senate Floor
Senate Standing Committee on Appropriations
Senate Standing Committee on Natural Resources and Water
Bill Author