AB 1405: Digital sign demonstration pilot program.
- Session Year: 2017-2018
- House: Assembly
- Latest Version Date: 2018-06-13
Existing law, the Outdoor Advertising Act, provides for the regulation by the Department of Transportation of advertising displays, as defined, within view of public highways.
This bill would enact the Advanced Digital Network Act. The require the department to establish a digital sign demonstration program. As part of the program, the bill would authorize the department, subject to federal approval, to enter into a specified comprehensive development lease agreement agreements until January 1, 2024, pursuant to a best value competitive procurement process for a project pilot projects with a public or private entity, entities or a consortia thereof, of those entities, to install and operate a network of up to 25 new digital signs within the rights-of-way of the state highway system that would display commercial advertising and public service messages. The bill would authorize the use of the digital signs for emergency messages, as needed, and require dedicated time to be provided to the department to use the advanced digital network digital signs for traveler information and motorist safety and awareness campaigns and any other public messaging desired by the state, without providing additional compensation to the contracting entity.
The bill would provide for the contracting entity with which the department has entered into the an agreement to contract and receive funds for the placement of commercial advertisements that meet certain standards established by the department. The bill would require revenues derived from the a pilot project to be allocated between the department and the contracting entity with which the department has entered into the agreement and would require those revenues received by the department to be deposited in the State Highway Account.
The bill would authorize the department to exercise any power possessed by it with respect to transportation projects to facilitate the project pilot projects and to adopt guidelines and procedures relative to advertising on the network. digital signs. The bill would require the department, within one year following the implementation of the project, to Transportation Agency, in coordination with the department and the Department of the California Highway Patrol, to annually submit a specified report beginning July 1, 2019, and until July 1, 2024, to the fiscal and policy committees of the Legislature having jurisdiction over transportation matters.
Existing law, the Outdoor Advertising Act, provides for the regulation by the Department of Transportation of advertising displays, as defined, within view of public highways.
This bill would enact the Advanced Digital Network Act. The bill would authorize the department, subject to federal approval, to enter into a specified comprehensive development lease agreement pursuant to a best value competitive procurement process for a project with a public or private entity, or a consortia thereof, to install and operate a network of new digital signs within the rights-of-way of the state highway system that would display commercial advertising and public service messages. The bill would authorize the use of the digital signs for emergency messages, as needed, and require dedicated time to be provided to the department to use the advanced digital network for traveler information and motorist safety and awareness campaigns and any other public messaging desired by the state, without providing additional compensation to the contracting entity.
The bill would provide for the contracting entity with which the department has entered into the agreement to contract and receive funds for the placement of commercial advertisements that meet certain standards established by the department. The bill would require revenues derived from the project to be allocated between the department and the contracting entity with which the department has entered into the agreement and would require those revenues received by the department to be deposited in the State Highway Account.
The bill would authorize the department to exercise any power possessed by it with respect to transportation projects to facilitate the project and to adopt guidelines and procedures relative to advertising on the network. The bill would require the department, within one year following the implementation of the project, to submit a specified report to the fiscal and policy committees of the Legislature having jurisdiction over transportation matters.
Existing law, the Outdoor Advertising Act, provides for the regulation by the Department of Transportation of advertising displays, as defined, within view of public highways.
This bill would enact the Advanced Digital Network Act. The bill would authorize the department, subject to federal approval, to enter into a specified comprehensive development lease agreement pursuant to a best value competitive procurement process for a project with a public or private entity, or a consortia thereof, to install and operate a network of new digital signs within the rights-of-way of the state highway system that would display commercial advertising and public service messages. The bill would authorize the use of the digital signs for emergency messages, as needed, and require dedicated time to be provided to the department to use the advanced digital network for traveler information and motorist safety and awareness campaigns and any other public messaging desired by the state, without providing additional compensation to the contracting entity.
The bill would provide for the contracting entity with which the department has entered into the agreement to contract and receive funds for the placement of commercial advertisements that meet certain standards established by the department. The bill would require revenues derived from the project to be allocated between the department and the contracting entity with which the department has entered into the agreement and would require those revenues received by the department to be deposited in the State Highway Account.
The bill would authorize the department to exercise any power possessed by it with respect to transportation projects to facilitate the project and to adopt guidelines and procedures relative to advertising on the network. The bill would require the department, within one year following the implementation of the project, to submit a specified report to the fiscal and policy committees of the Legislature having jurisdiction over transportation matters.
Existing law requires the Public Utilities Commission to adopt a process for each load-serving entity to file an integrated resource plan and a schedule for periodic updates to the plan to ensure that the load-serving entity meets, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030. Existing law requires a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, on or before January 1, 2019, to adopt an integrated resource plan and a process for updating the plan at least once every 5 years to ensure that the utility satisfies, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030.This bill would require the commission and the governing boards of local publicly owned electric utilities, to consider, as a part of the integrated resource plan process, the role of distributed energy resources and other specified energy-related and efficiency-related tools, in helping to ensure that each load-serving entity or local publicly owned electric utility, as applicable, meets energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers. Because this bill would impose additional duties on local publicly owned electric utilities, this bill would impose a state-mandated local program.Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.Because a violation of an order or decision of the commission implementing the bills requirements would be a crime, this bill would impose a state-mandated local program by creating a new crime.This bill would incorporate additional changes to Section 454.52 of the Public Utilities Code proposed by AB 759 to be operative only if this bill and AB 759 are enacted and this bill is enacted last.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for specified reasons.Existing law requires the Public Utilities Commission to adopt a process for each load-serving entity to file an integrated resource plan and a schedule for periodic updates to the plan to ensure that the load-serving entity meets, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030. Existing law requires a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, on or before January 1, 2019, to adopt an integrated resource plan and a process for updating the plan at least once every 5 years to ensure that the utility satisfies, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030.
This bill would require the commission and the governing boards of local publicly owned electric utilities, as a part of the integrated resource plan process, to consider to consider, as a part of the integrated resource plan process, the role of clean energy technology, demand response, and energy efficiency distributed energy resources and other specified energy-related and efficiency-related tools, in helping to ensure that each load-serving entity or local publicly owned electric utility, as applicable, meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers. Because this bill would impose additional duties on local publicly owned electric utilities, this bill would impose a state-mandated local program.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of an order or decision of the commission implementing the bills requirements would be a crime, this bill would impose a state-mandated local program by creating a new crime.
This bill would incorporate additional changes to Section 454.52 of the Public Utilities Code proposed by AB 759 to be operative only if this bill and AB 759 are enacted and this bill is enacted last.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law requires the Public Utilities Commission to adopt a process for each load-serving entity to file an integrated resource plan and a schedule for periodic updates to the plan to ensure that the load-serving entity meets, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030. Existing law requires a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, on or before January 1, 2019, to adopt an integrated resource plan and a process for updating the plan at least once every 5 years to ensure that the utility satisfies, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030.
This bill would require the commission and the governing boards of local publicly owned electric utilities, as a part of the integrated resource plan process, to establish policies and procedures to consider the role of clean energy technology, demand response, and energy efficiency in helping to ensure that each load-serving entity or local publicly owned electric utility, as applicable, meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers. Because this bill would impose additional duties on local publicly owned electric utilities, this bill would impose a state-mandated local program.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of an order or decision of the commission implementing the bills requirements would be a crime, this bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law requires the Public Utilities Commission to adopt a process for each load-serving entity to file an integrated resource plan and a schedule for periodic updates to the plan to ensure that the load-serving entity meets, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030. Existing law requires a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, on or before January 1, 2019, to adopt an integrated resource plan and a process for updating the plan at least once every 5 years to ensure that the utility satisfies, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030.
This bill would require the commission and the governing boards of local publicly owned electric utilities, as a part of the integrated resource plan process, to establish policies and procedures to ensure that each load-serving entity or local publicly owned electric utility, as applicable, meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation in achieving the states energy goals at the least cost to ratepayers. Because this bill would impose additional duties on local publicly owned electric utilities, this bill would impose a state-mandated local program.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of an order or decision of the commission implementing the bills requirements would be a crime, this bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
The California Renewables Portfolio Standard Program requires the Public Utilities Commission to establish a renewables portfolio standard requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources, as defined, so that the total kilowatthours of those products sold to their retail end-use customers achieves 25% of retail sales by December 31, 2016, 33% by December 31, 2020, 40% by December 31, 2024, 45% by December 31, 2027, and 50% by December 31, 2030. The program additionally requires each local publicly owned electric utility, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources to achieve the procurement requirements established by the program.Existing law requires the commission to open a proceeding to determine appropriate targets, if any, for each load-serving entity to procure viable and cost-effective energy storage systems to be achieved by December 31, 2020. Existing law requires the commission to reevaluate the determination not less than once every 3 years. Existing law requires the governing board of a local publicly owned electric utility to initiate a process to determine appropriate targets, if any, for the utility to procure viable and cost-effective energy storage systems to be achieved by December 31, 2020.This bill would require the commission to determine, by December 31, 2018, the actual percentage of kilowatthours delivered by each load-serving entity during a specified 4-hour period of heavy electricity demand, known in the bill as the peakload time period, that is derived from eligible renewable resources or energy storage systems, collectively referenced in the bill as clean peak resources. The bill would require the commission to ensure that each load-serving entity procure a minimum percentage of kilowatthours delivered during the peakload time period from clean peak resources on at least 15 days during each month in accordance with a specified schedule. Because a violation of an order or direction of the commission would be a crime, this bill would impose a state-mandated local program. The bill would require local publicly owned electric utilities to determine, by December 31, 2018, the actual percentage of kilowatthours delivered during the peakload time period from clean peak resources. The bill would require each local publicly owned electric utility to procure a minimum percentage of kilowatthours delivered during the peakload time period from clean peak resources on at least 15 days during each month in accordance to a specified schedule. Because the bill would impose additional duties on a local agency, this bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for specified reasons.The California Renewables Portfolio Standard Program requires the Public Utilities Commission to establish a renewables portfolio standard requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources, as defined, so that the total kilowatthours of those products sold to their retail end-use customers achieves 25% of retail sales by December 31, 2016, 33% by December 31, 2020, 40% by December 31, 2024, 45% by December 31, 2027, and 50% by December 31, 2030. The program additionally requires each local publicly owned electric utility, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources to achieve the procurement requirements established by the program.
Existing law requires the commission to open a proceeding to determine appropriate targets, if any, for each load-serving entity to procure viable and cost-effective energy storage systems to be achieved by December 31, 2020. Existing law requires the commission to reevaluate the determination not less than once every 3 years. Existing law requires the governing board of a local publicly owned electric utility to initiate a process to determine appropriate targets, if any, for the utility to procure viable and cost-effective energy storage systems to be achieved by December 31, 2020.
This bill would require the commission to ensure that an unspecified percentage of the energy delivered to ratepayers determine, by December 31, 2018, the actual percentage of kilowatthours delivered by each load-serving entity during a specified 4-hour period of heavy electricity demand, known in the bill as the peakload time period by load-serving entities period, that is derived from eligible renewable resources or energy storage systems. systems, collectively referenced in the bill as clean peak resources. The bill would require the commission to ensure that each load-serving entity procure a minimum percentage of kilowatthours delivered during the peakload time period from clean peak resources on at least 15 days during each month in accordance with a specified schedule. Because a violation of an order or direction of the commission would be a crime, this bill would impose a state-mandated local program. The bill would require local publicly owned electric utilities to ensure that an unspecified percentage of energy determine, by December 31, 2018, the actual percentage of kilowatthours delivered to ratepayers during the peakload time period is derived from eligible renewable resources or energy storage systems. from clean peak resources. The bill would require each local publicly owned electric utility to procure a minimum percentage of kilowatthours delivered during the peakload time period from clean peak resources on at least 15 days during each month in accordance to a specified schedule. Because the bill would impose additional duties on a local agency, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
The California Renewables Portfolio Standard Program requires the Public Utilities Commission to establish a renewables portfolio standard requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources, as defined, so that the total kilowatthours of those products sold to their retail end-use customers achieves 25% of retail sales by December 31, 2016, 33% by December 31, 2020, 40% by December 31, 2024, 45% by December 31, 2027, and 50% by December 31, 2030. The program additionally requires each local publicly owned electric utility, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources to achieve the procurement requirements established by the program.
Existing law requires the commission to open a proceeding to determine appropriate targets, if any, for each load-serving entity to procure viable and cost-effective energy storage systems to be achieved by December 31, 2020. Existing law requires the commission to reevaluate the determination not less than once every 3 years. Existing law requires the governing board of a local publicly owned electric utility to initiate a process to determine appropriate targets, if any, for the utility to procure viable and cost-effective energy storage systems to be achieved by December 31, 2020.
This bill would require the commission to ensure that an unspecified percentage of the energy delivered to ratepayers during the peakload time period by load-serving entities is derived from eligible renewable resources or energy storage systems. Because a violation of an order or direction of the commission would be a crime, this bill would impose a state-mandated local program. The bill would require local publicly owned electric utilities to ensure that an unspecified percentage of energy delivered to ratepayers during the peakload time period is derived from eligible renewable resources or energy storage systems. Because the bill would impose additional duties on a local agency, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
The Legislature finds and declares all of the following:
(a)Communicating timely information to the traveling public regarding laws, services and events, public service and public health and safety messages, and emergency notifications is an essential public purpose that advances the general health, welfare, and safety of the citizens of California and entities that visit and travel through the state.
(b)California presently makes available on its Internet Web site information regarding laws, services and events, communicates public service and public health and safety messages, and transmits emergency notifications to users of computers, smartphones, and similar online and wireless devices. While this mechanism is effective, it does not provide real-time information to motorists.
(c)Recent advances in technology have made it possible to create a reliable, effective, and comprehensive network of reliable and effective digital signs that combine text with graphics in order to rapidly and clearly communicate important emergency and public service information to the users of Californias highways more safely and effectively than the current methods. This These advanced technology digital network would signs could increase the efficacy and reliability of this information transmission by increasing the number and visibility of signs providing emergency and public service information, thereby enhancing the safety and travel experience of the people of California, and function as an extension and improvement of the existing California public information and emergency messaging communication efforts.
(d)The establishment and operation of an advanced digital network should be accomplished at no cost to the state through a public-private partnership, where the private partner erects and operates the network, but is allowed to earn revenues from advertising when signs on the network are not used for public purposes.(e)Revenues to the state generated by the advanced digital network would provide additional funding for transportation and safety initiatives such as additional highway maintenance and repair, in return for the right to place advertisements on the advanced digital network in a manner that is consistent with, and supports, the networks safety and public communication functions.(f)The advanced digital network signs shall be located and installed in accordance with department guidelines for orientation toward motorists on the traveled way and shall have minimal impact outside of those rights-of-way.(g)The authority to use the advanced digital network for commercial advertising shall require that the advertising and department messaging, when displayed in combination, are determined to be safe and do not create an unsafe distraction to motorists, and is subject to any required prior authorization under federal law.(d)On March 28, 2018, the department issued a report called the Outdoor Advertising Report: Changeable Message Signs pursuant to a statutory requirement (Section 7 of Chapter 27 of the Statutes of 2014) that examines the feasibility of conducting a pilot project to place commercial outdoor advertising, in the form of a message center, on state-owned changeable message signs. The department report concludes that it could be feasible to conduct a pilot project, which would allow the State to evaluate any potential safety implications and assess how much potential revenue could be generated.
(e)The department report notes there are significant challenges to implement a pilot project including concerns of safety to the traveling public, local agency and community approval, and operational impacts to the state highway system. It further notes that the department does not have state or federal authority to move forward because waivers or exemptions would be needed from the federal government pursuant to portions of the federal outdoor advertising regulations, the Outdoor Advertising Act (Chapter 2 (commencing with Section 5200) of Division 3 of the Business and Professions Code), and sections of the federal Manual on Uniform Traffic Control Devices.
(f)The department report concludes that, once appropriate authority is received, it would be feasible to conduct a phased four-year demonstration pilot program of 25 changeable message signs with message center capabilities to provide the appropriate test environment for the concept.
(g)It is the intent of the Legislature to require the department to establish a digital sign demonstration pilot program to study safety and operational impacts, assist in evaluating revenue assumptions, and determine risks and benefits of a next generation changeable message sign that displays advertising and traditional department messaging.
172.4.172.2.For purposes of this article, the following terms mean the following:
(a)Advanced digital network means an integrated network of digital signs. The advanced digital network shall consist of new digital signs at locations as determined by the department.(b)(a)Agreement means a legally enforceable agreement for the a pilot project to install and operate an advanced digital network, a digital sign or signs, including, but not limited to, a license, lease, highway improvement agreement, easement, encroachment permit, or operation and maintenance agreement.
(c)(b)Best value means a value determined by objective criteria that may include, but are not limited to, revenues to the state, features, experience, functions, life cycle costs, price, the capability to develop and incorporate advanced technologies, and other criteria deemed appropriate by the department.
(c)Changeable message sign has the same meaning as defined in Section 101.14.
(d)Contracting entity or lessee entity means a public or private entity, entities, or consortia thereof, of those entities, that has have entered into a comprehensive development lease agreement with the department for a pilot project pursuant to this section.
(e)Design-build means a procurement process in which both the design and construction of a project are procured from a single entity.(f)(e)Digital sign means a department-owned or controlled sign or official changeable message sign with message center capabilities that is designed to display various messages that provide information to the public, as well as advertising, by mechanical or electronic means centrally controlled through a network, means, including, but not limited to, digital and light-emitting diode (LED) technologies.
(g)Project(f)Pilot project means to study, plan, design, construct, develop, finance, maintain, rebuild, improve, repair, lease, operate, or any combination of these, a state-of-the-art, full-color network of digital signs sign or signs within the rights-of-way of the state highway system.
172.4.(a)Consistent with the requirements and purposes of this article, the department shall establish a digital sign demonstration program.
(b)As part of the program, the department may enter into lease agreements pursuant to Section 172.6 with public or private entities, or consortia of those entities, to establish pilot projects to install and operate new digital signs within the state highway system right-of-way.
(c)The department may authorize the installation and operation of up to 25 new digital signs under the program, which shall be installed and operated in different locations with the goal of testing the signs in diverse settings. The department may authorize the new digital signs to replace existing changeable message signs or to be established in new locations, except that digital signs established at new locations shall not be installed on scenic highways.
(d)The department shall authorize each pilot project to install and operate a specific number of digital signs but the total number of digital signs between all of the pilot projects shall not to exceed 25 digital signs.
(e)Before the installation of any digital sign, the department shall develop a plan and protocol, which shall be submitted to the Legislature, to measure the impact of the program, including, but not limited to, safety effects, benefits to the public, and revenue generation.
172.6.(a)Notwithstanding any other law, and subject to any required federal approval authorizing the department to do so, the department may solicit proposals, accept unsolicited proposals, negotiate, and enter into a comprehensive development lease agreement agreements with a public or private entity, entities, or consortia thereof, of those entities, to conduct a single project, pilot projects, in a manner that best effectuates the purposes of this article, to install and operate a new digital sign or signs within the state highway system right-of-way, in a manner to best effectuate the purposes of this article. If the department is advised by the United States Department of Transportation, or any of its agencies, that a display of advertising authorized by this article would result in the reduction of federal aid highway funds to the state pursuant to Section 131 of Title 23 of the United States Code, that display of advertising shall not be made. The department shall conduct a best value competitive procurement and negotiate an initial agreement to become effective upon obtaining any necessary federal authorization. The department may provide services for which it is reimbursed with respect to preliminary design, inspection, and oversight of the a pilot project.
(b)The An agreement shall provide that the contracting entity with which the agreement is entered into will bear all reasonable costs of the pilot project, including, but not limited to, costs of installation, maintenance, and operation of the pilot project.
(c)The An agreement described in subdivision (a) shall do all of the following:
(1)Provide for construction, operation, and maintenance of a network of new digital sign or signs at locations selected for the project. pilot project by the department in consultation with the regional transportation planning agency or county transportation commission or authority in whose jurisdiction the project will be located and the Department of the California Highway Patrol.
(2)Provide for complete reversion of any ownership interest in any of the privately constructed, improved, operated, and maintained digital signs to the department at the expiration of the agreement at no charge to the department and free and clear of any liens or encumbrances.
(3)Provide that all department emergency notifications shall have priority over other messaging, including advertising.
(4)Provide that the department, in consultation with the Department of the California Highway Patrol, shall retain the ability to make a determination on the safety of the digital signs, and may take those actions deemed necessary to protect public safety.
(5)Require that the agreement entered into pursuant to this section include indemnity, defense, and hold harmless provisions agreed to by the department and the contracting entity, including provisions for indemnifying the State of California against any claims or losses resulting or accruing from the performance of the contracting entity, including advertising on the advanced digital network, digital signs, excluding any advertising approved in advance or provided by the department. This paragraph does not require the agreement to include any obligation of the State of California to indemnify, defend, or hold harmless the contracting entity.
(6)Provide for the contracting entity with which the agreement is made to contract and receive funds for the placement of commercial advertisements on the advanced digital network, digital signs except during times and to the extent the signs are in use by the department and to share revenues generated in connection with the use of those signs for commercial advertising in furtherance of the public interest. interest in a proportion negotiated by the department but the agreement shall not allocate less than 50 percent of those revenues to the department after reasonable installation costs have been recovered by the contracting entity.
(7)Provide that the agreement shall cease on January 1, 2024, at which point commercial advertising shall cease unless authorized by a subsequent statute.
(d)The advanced digital network digital signs to be constructed pursuant to this article shall, during the term of the applicable agreement, be deemed to be a part of the state highway system for purposes of identification, maintenance, and enforcement of traffic laws, and part of the state highway system for emergency notification and other public service information purposes and for the purposes of Division 3.6 (commencing with Section 810) of Title 1 of the Government Code.
(e)Revenues from the advanced digital network digital signs shall be allocated between the contracting entity with which the agreement is made and the department in accordance with the agreement as provided in paragraph (6) of subdivision (c). Revenue derived from the project and received by the department, or any other revenue generated from advertising on the advanced digital network digital signs owned by the department, and received by the department, shall be deposited in the State Highway Account in the State Transportation Fund. This revenue shall not be subject to the transfer under Section 183.1 or any successor to that section. Revenues deposited under this section shall be retained in the State Highway Account, subject to appropriation by the Legislature, consistent with the provisions of any federal authorization.
(f)The digital signs shall meet the design, construction, and operating requirements in the departments standards and guidelines, including, but not limited to, controls, such as state-of-the-art sensors that control the brightness of the display based on the surrounding ambient light levels and other technologies muting adjacent glare, that focus the zone of vision toward motorists on the traveled way and prevent neighborhood impacts in the vicinity of the digital signs.
(g)The department shall retain the ultimate right to determine whether the location for the placement of a digital sign has or will negatively impact a residential area or community. If the department determines that the location of a digital sign has or will have a negative impact on a residential area or community, the department may, in its discretion, impose additional requirements on its lighting or placement, require a different placement, not allow its placement, or require its removal.
(h)For the purpose of facilitating the a pilot project, the applicable agreement between the parties may include provisions for the lease of rights-of-way in, and airspace over or under, highways, public streets, rail, or related facilities, for the granting of necessary easements, and for the issuance of permits or other authorizations to enable the construction of the project. Facilities subject to an agreement under this section shall, at all times, be owned by the department.
(i)The An agreement shall require digital signs on the state highway system to meet all requirements for noise mitigation, landscaping, pollution control, and safety that otherwise would apply if the department were designing, building, and operating the pilot project.
(j)Construction, alteration, demolition, installation, repair, and maintenance work for digital signs is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
172.8.The department may exercise any power possessed by it with respect to transportation projects to facilitate the project pilot projects pursuant to this article. The department may provide services to the contracting entity for which the department is reimbursed, including, but not limited to, planning, environmental planning, environmental certification, environmental review, preliminary design, design, right-of-way acquisition, construction, maintenance, and policing of the project. The department shall regularly inspect the advanced digital network digital signs and require the contracting entity to maintain and operate the advanced digital network digital signs according to adopted standards. Except as may otherwise be set forth in the agreement, the contracting entity shall be responsible for all costs due to development, maintenance, repair, rehabilitation, and reconstruction, and operating costs.
172.9.172.10.Advertising on the advanced digital network digital signs shall be in the form and under those conditions as may be determined by the department and as may be set forth in standards, guidelines, and procedures adopted by the department. The advertising shall not compromise safety or the departments safety communication functions. The network digital signs shall enhance public messaging, including, but not limited to, safety campaigns, emergency notifications, travel times, and traveler information and the function of the advanced digital network. information. All digital signs subject to this article shall be exempt from subdivision (d) of Section 5408 of the Business and Professions Code and from any and all regulations promulgated adopted in connection with subdivision (d) of Section 5408 of the Business and Professions Code. Code, except that this exemption does not prevent the department from imposing any restrictions necessary for safety purposes.
173.The department shall not enter into an agreement with any contracting entity that would cause or permit any digital sign to display or advertise alcohol, tobacco, firearms, sexually explicit material, political messages or advertisements, or any illegal activity. The department shall adopt policies and guidelines in connection with the content and formatting of the advertising.
173.2.The department may use the digital signs for emergency messages, as needed, and dedicated time shall be provided to the department to use the advanced digital network digital signs for traveler information and motorist safety and awareness campaigns and any other public service messaging desired by the state, without providing compensation to the contracting entity with which it enters into an agreement pursuant to this article.
173.4.(a)When choosing the a contracting entity with which to enter into an agreement pursuant to Section 172.6 to effectuate the purposes of this article, the department may utilize, but is not limited to utilizing, one or more of the following procurement approaches:
(1)Solicitations of proposals for defined projects and calls for project proposals within defined parameters.
(2)Prequalification and short-listing of proposers prior to final evaluation of proposals.
(3)Final evaluation of proposals based on qualifications and best value.
(4)Negotiations with proposers prior to award.
(5)Acceptance of unsolicited proposals, with issuance of requests for competing proposals.
(b)When evaluating a proposal submitted by the contracting entity or lessee, entity, the department or the regional transportation agency may award a contract on the basis of best value.
(c)The department may retain a consultant or adviser to assist in preparing the best value criteria, selection of a contracting entity, and oversight of the project. a pilot project. The consultant or adviser shall not bid on the project or, before one year following award of a contract, work as an officer or employee of, or consultant or adviser to, any contracting entity or entities seeking to bid on the project.
(d)The A contracting entity shall have the following qualifications:
(1)Evidence that the members of the contracting entity have completed, or have demonstrated the experience, competency, capability, and capacity to complete, a project of similar size, scope, or complexity, and that proposed key personnel have sufficient experience and training to competently manage and complete the design and construction of the project, and a financial statement that ensures that the contracting entity or lessee has the capacity to complete the project.
(2)The licenses, registration, and credentials required to design and construct the project, including, but not limited to, information on the revocation or suspension of any license, credential, or registration.
(3)Evidence that establishes that members of the contracting entity or lessee have the capacity to obtain all required payment and performance bonding, liability insurance, and errors and omissions insurance.
(4)Evidence that the contracting entity or lessee has workers compensation experience, history, and a worker safety program of members of the contracting entity or lessee that is acceptable to the department or regional transportation agency.
(5)A full disclosure regarding all of the following with respect to each member of the contracting entity or lessee during the past five years:
(A)Any serious or willful violation of Part 1 (commencing with Section 6300) of Division 5 of the Labor Code or the federal Occupational Safety and Health Act of 1970 (Public Law 91-596).
(B)Any instance in which members of the contracting entity or lessee were debarred, disqualified, or removed from a federal, state, or local governmental public works project.
(C)Any instance where members of the contracting entity, or its owners, officers, or managing employees submitted a bid on a public works project and were found to be nonresponsive or were found by an awarding body not to be a responsible bidder.
(D)Any instance where members of the contracting entity or lessee, entity, or its owners, officers, or managing employees defaulted on a construction contract.
(E)Any violations of the Contractors State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code), including, but not limited to, alleged violations of federal or state law regarding the payment of wages, benefits, apprenticeship requirements, or personal income tax withholding, or Federal Insurance Contributions Act (FICA) withholding requirements.
(F)Any bankruptcy or receivership of any member of the contracting entity or lessee, entity, including, but not limited to, information concerning any work completed by a surety.
(G)Any settled adverse claims, disputes, or lawsuits between the owner of a public works project and any member of the contracting entity or lessee during the five years preceding submission of a bid under this article, in which the claim, settlement, or judgment exceeds fifty thousand dollars ($50,000). Information shall also be provided concerning any work completed by a surety during this five-year period.
173.6.Within one year following implementation of the project, the department shall The Transportation Agency, in coordination with the department and the Department of the California Highway Patrol, shall annually submit a report to the fiscal and policy committees of the Legislature with jurisdiction over transportation matters. matters with the first report due on or before July 1, 2019, and the final report due on or before July 1, 2024. The report shall include, but not be limited to, all of the following:
(a)The status of implementation of the each agreement, including the number of digital signs placed and the locations of the digital signs placed.
(b)The public safety impacts of the digital signs, including, but not limited to, a comparison of the number of traffic incidents, accidents, injuries, and fatalities on the highways adjacent to a new sign in the five years prior to the placement of each sign and the time period since each sign was erected.
(b)(c)The amount of revenue received, cost savings to the department, and the costs incurred by the department with respect to the each pilot project, including costs incurred prior to the time the department entered into an agreement.
(c)(d)An assessment of the effect the project has pilot projects have had on public safety, emergency notification, traveler information, and motorist safety and awareness campaigns.
(d)(e)A description of the types of advertising content displayed on the digital signs.
(f)A recommendation on whether the pilot projects should be continued along with any recommended changes.
173.8.The provisions of this article are severable. If any provision of this article or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
This article shall be known, and may be cited, as the Advanced Digital Network Act.
172.1.The Legislature finds and declares all of the following:
(a)Communicating timely information to the traveling public regarding laws, services and events, public service and public health and safety messages, and emergency notifications is an essential public purpose that advances the general health, welfare, and safety of the citizens of California and entities that visit and travel through the state.
(b)California presently makes available on its Internet Web site information regarding laws, services and events, communicates public service and public health and safety messages, and transmits emergency notifications to users of computers, smartphones, and similar online and wireless devices. While this mechanism is effective, it does not provide real-time information to motorists.
(c)Recent advances in technology have made it possible to create a reliable, effective, and comprehensive network of digital signs that combine text with graphics in order to rapidly and clearly communicate important emergency and public service information to the users of Californias highways more safely and effectively than the current methods. This advanced technology digital network would increase the efficacy and reliability of this information transmission by increasing the number and visibility of signs providing emergency and public service information, thereby enhancing the safety and travel experience of the people of California, and function as an extension and improvement of the existing California public information and emergency messaging communication efforts.
(d)The establishment and operation of an advanced digital network should be accomplished at no cost to the state through a public-private partnership, where the private partner erects and operates the network, but is allowed to earn revenues from advertising when signs on the network are not used for public purposes.
(e)Revenues to the state generated by the advanced digital network would provide additional funding for transportation and safety initiatives such as additional highway maintenance and repair, in return for the right to place advertisements on the advanced digital network in a manner that is consistent with, and supports, the networks safety and public communication functions.
(f)The advanced digital network signs shall be located and installed in accordance with department guidelines for orientation toward motorists on the traveled way and shall have minimal impact outside of those rights-of-way.
(g)The authority to use the advanced digital network for commercial advertising shall require that the advertising and department messaging, when displayed in combination, are determined to be safe and do not create an unsafe distraction to motorists, and is subject to any required prior authorization under federal law.
172.4.For purposes of this article, the following terms mean the following:
(a)Advance Advanced digital network means an integrated network of digital signs. The advanced digital network shall consist of new digital signs at locations as determined by the department.
(b)Agreement means a legally enforceable agreement for the project to install and operate an advanced digital network, including, but not limited to, a license, lease, highway improvement agreement, easement, encroachment permit, or operation and maintenance agreement.
(c)Best value means a value determined by objective criteria that may include, but are not limited to, revenues to the state, features, experience, functions, life cycle costs, price, the capability to develop and incorporate advanced technologies, and other criteria deemed appropriate by the department.
(d)Contracting entity or lessee means a public or private entity, or consortia thereof, that has entered into a comprehensive development lease agreement with the department for a project pursuant to this section.
(e)Design-build means a procurement process in which both the design and construction of a project are procured from a single entity.
(f)Digital sign means a department-owned or controlled sign or official sign that is designed to display various messages that provide information to the public, as well as advertising, by mechanical or electronic means centrally controlled through a network, including, but not limited to, digital and light-emitting diode (LED) technologies.
(g)Project means to study, plan, design, construct, develop, finance, maintain, rebuild, improve, repair, lease, operate, or any combination of these, a state-of-the-art, full-color network of digital signs within the rights-of-way of the state highway system.
172.6.(a)Notwithstanding any other law, and subject to any required federal approval authorizing the department to do so, the department may solicit proposals, accept unsolicited proposals, negotiate, and enter into a comprehensive development lease agreement with a public or private entity, or consortia thereof, to conduct a single project, in a manner that best effectuates the purposes of this article, to install and operate new digital signs within the state highway right-of-way, in a manner to best effectuate the purposes of this article. If the department is advised by the United States Department of Transportation, or any of its agencies, that a display of advertising authorized by this article would result in the reduction of federal aid highway funds to the state pursuant to Section 131 of Title 23 of the United States Code, that display of advertising shall not be made. The department shall conduct a best value competitive procurement and negotiate an initial agreement to become effective upon obtaining any necessary federal authorization. The department may provide services for which it is reimbursed with respect to preliminary design, inspection, and oversight of the project.
(b)The agreement shall provide that the contracting entity with which the agreement is entered into will bear all reasonable costs of the project, including, but not limited to, costs of installation, maintenance, and operation of the project.
(c)The agreement described in subdivision (a) shall do all of the following:
(1)Provide for construction, operation, and maintenance of a network of new digital signs at locations selected for the project.
(2)Provide for complete reversion of any ownership interest in any of the privately constructed, improved, operated, and maintained digital signs to the department at the expiration of the agreement at no charge to the department and free and clear of any liens or encumbrances.
(3)Provide that all department emergency notifications shall have priority over other messaging, including advertising.
(4)Provide that the department, in consultation with the Department of the California Highway Patrol, shall retain the ability to make a determination on the safety of the digital signs, and may take those actions deemed necessary to protect public safety.
(5)Require that the agreement entered into pursuant to this section include indemnity, defense, and hold harmless provisions agreed to by the department and the contracting entity, including provisions for indemnifying the State of California against any claims or losses resulting or accruing from the performance of the contracting entity, including advertising on the advanced digital network, excluding any advertising approved in advance or provided by the department. This paragraph does not require the agreement to include any obligation of the State of California to indemnify, defend, or hold harmless the contracting entity.
(6)Provide for the contracting entity with which the agreement is made to contract and receive funds for the placement of commercial advertisements on the advanced digital network, except during times and to the extent the signs are in use by the department and to share revenues generated in connection with the use of those signs for commercial advertising in furtherance of the public interest.
(d)The advanced digital network to be constructed pursuant to this article shall, during the term of the agreement, be deemed to be a part of the state highway system for purposes of identification, maintenance, and enforcement of traffic laws, and part of the state highway system for emergency notification and other public service information purposes and for the purposes of Division 3.6 (commencing with Section 810) of Title 1 of the Government Code.
(e)Revenues from the advanced digital network shall be allocated between the contracting entity with which the agreement is made and the department in accordance with the agreement as provided in paragraph (6) of subdivision (c). Revenue derived from the project and received by the department, or any other revenue generated from advertising on the advanced digital network owned by the department, and received by the department, shall be deposited in the State Highway Account in the State Transportation Fund. This revenue shall not be subject to the transfer under Section 183.1 or any successor to that section. Revenues deposited under this section shall be retained in the State Highway Account, subject to appropriation by the Legislature, consistent with the provisions of any federal authorization.
(f)The digital signs shall meet the design, construction, and operating requirements in the departments standards and guidelines, including, but not limited to, controls, such as state-of-the-art sensors that control the brightness of the display based on the surrounding ambient light levels and other technologies muting adjacent glare, that focus the zone of vision toward motorists on the traveled way and prevent neighborhood impacts in the vicinity of the digital signs.
(g)The department shall retain the ultimate right to determine whether the location for the placement of a digital sign has or will negatively impact a residential area or community. If the department determines that the location of a digital sign has or will have a negative impact on a residential area or community, the department may, in its discretion, impose additional requirements on its lighting or placement, require a different placement, not allow its placement, or require its removal.
(h)For the purpose of facilitating the project, the agreement between the parties may include provisions for the lease of rights-of-way in, and airspace over or under, highways, public streets, rail, or related facilities, for the granting of necessary easements, and for the issuance of permits or other authorizations to enable the construction of the project. Facilities subject to an agreement under this section shall, at all times, be owned by the department.
(i)The agreement shall require digital signs on the state highway system to meet all requirements for noise mitigation, landscaping, pollution control, and safety that otherwise would apply if the department were designing, building, and operating the project.
(j)Construction, alteration, demolition, installation, repair, and maintenance work for digital signs is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
172.8.The department may exercise any power possessed by it with respect to transportation projects to facilitate the project pursuant to this article. The department may provide services to the contracting entity for which the department is reimbursed, including, but not limited to, planning, environmental planning, environmental certification, environmental review, preliminary design, design, right-of-way acquisition, construction, maintenance, and policing of the project. The department shall regularly inspect the advanced digital network and require the contracting entity to maintain and operate the advanced digital network according to adopted standards. Except as may otherwise be set forth in the agreement, the contracting entity shall be responsible for all costs due to development, maintenance, repair, rehabilitation, and reconstruction, and operating costs.
172.9.Advertising on the advanced digital network shall be in the form and under those conditions as may be determined by the department and as may be set forth in standards, guidelines, and procedures adopted by the department. The advertising shall not compromise safety or the departments safety communication functions. The network shall enhance public messaging, including, but not limited to, safety campaigns, emergency notifications, travel times, and traveler information and the function of the advanced digital network. All digital signs subject to this article shall be exempt from Section 5408 of the Business and Professions Code and from any and all regulations promulgated in connection with Section 5408 of the Business and Professions Code.
173.The department shall not enter into an agreement with any contracting entity that would cause or permit any digital sign to display or advertise alcohol, tobacco, firearms, sexually explicit material, political messages or advertisements, or any illegal activity. The department shall adopt policies and guidelines in connection with the content and formatting of the advertising.
173.2.The department may use the digital signs for emergency messages, as needed, and dedicated time shall be provided to the department to use the advanced digital network for traveler information and motorist safety and awareness campaigns and any other public service messaging desired by the state, without providing compensation to the contracting entity with which it enters into an agreement pursuant to this article.
173.4.(a)When choosing the contracting entity with which to enter into an agreement pursuant to Section 172.6 to effectuate the purposes of this article, the department may utilize, but is not limited to utilizing, one or more of the following procurement approaches:
(1)Solicitations of proposals for defined projects and calls for project proposals within defined parameters.
(2)Prequalification and short-listing of proposers prior to final evaluation of proposals.
(3)Final evaluation of proposals based on qualifications and best value.
(4)Negotiations with proposers prior to award.
(5)Acceptance of unsolicited proposals, with issuance of requests for competing proposals.
(b)When evaluating a proposal submitted by the contracting entity or lessee, the department or the regional transportation agency may award a contract on the basis of best value.
(c)The department may retain a consultant or adviser to assist in preparing the best value criteria, selection of a contracting entity, and oversight of the project. The consultant or adviser shall not bid on the project or, before one year following award of a contract, work as an officer or employee of, or consultant or adviser to, any contracting entity or entities seeking to bid on the project.
(d)The contracting entity shall have the following qualifications:
(1)Evidence that the members of the contracting entity have completed, or have demonstrated the experience, competency, capability, and capacity to complete, a project of similar size, scope, or complexity, and that proposed key personnel have sufficient experience and training to competently manage and complete the design and construction of the project, and a financial statement that ensures that the contracting entity or lessee has the capacity to complete the project.
(2)The licenses, registration, and credentials required to design and construct the project, including, but not limited to, information on the revocation or suspension of any license, credential, or registration.
(3)Evidence that establishes that members of the contracting entity or lessee have the capacity to obtain all required payment and performance bonding, liability insurance, and errors and omissions insurance.
(4)Evidence that the contracting entity or lessee has workers compensation experience, history, and a worker safety program of members of the contracting entity or lessee that is acceptable to the department or regional transportation agency.
(5)A full disclosure regarding all of the following with respect to each member of the contracting entity or lessee during the past five years:
(A)Any serious or willful violation of Part 1 (commencing with Section 6300) of Division 5 of the Labor Code or the federal Occupational Safety and Health Act of 1970 (Public Law 91-596).
(B)Any instance in which members of the contracting entity or lessee were debarred, disqualified, or removed from a federal, state, or local governmental public works project.
(C)Any instance where members of the contracting entity, or its owners, officers, or managing employees submitted a bid on a public works project and were found to be nonresponsive or were found by an awarding body not to be a responsible bidder.
(D)Any instance where members of the contracting entity or lessee, or its owners, officers, or managing employees defaulted on a construction contract.
(E)Any violations of the Contractors State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code), including, but not limited to, alleged violations of federal or state law regarding the payment of wages, benefits, apprenticeship requirements, or personal income tax withholding, or Federal Insurance Contributions Act (FICA) withholding requirements.
(F)Any bankruptcy or receivership of any member of the contracting entity or lessee, including, but not limited to, information concerning any work completed by a surety.
(G)Any settled adverse claims, disputes, or lawsuits between the owner of a public works project and any member of the contracting entity or lessee during the five years preceding submission of a bid under this article, in which the claim, settlement, or judgment exceeds fifty thousand dollars ($50,000). Information shall also be provided concerning any work completed by a surety during this five-year period.
173.6.Within one year following implementation of the project, the department shall submit a report to the fiscal and policy committees of the Legislature with jurisdiction over transportation matters. The report shall include, but not be limited to, all of the following:
(a)The status of implementation of the agreement, including the number of digital signs placed and the locations of the digital signs placed.
(b)The amount of revenue received, cost savings to the department, and the costs incurred by the department with respect to the project, including costs incurred prior to the time the department entered into an agreement.
(c)An assessment of the effect the project has had on public safety, emergency notification, traveler information, and motorist safety and awareness campaigns.
(d)A description of the types of advertising content displayed on the digital signs.
173.8.The provisions of this article are severable. If any provision of this article or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
This article shall be known, and may be cited, as the Advanced Digital Network Act.
172.1.The Legislature finds and declares all of the following:
(a)Communicating timely information to the traveling public regarding laws, services and events, public service and public health and safety messages, and emergency notifications is an essential public purpose that advances the general health, welfare, and safety of the citizens of California and entities that visit and travel through the state.
(b)California presently makes available on its Internet Web site information regarding laws, services and events, communicates public service and public health and safety messages, and transmits emergency notifications to users of computers, smartphones, and similar online and wireless devices. While this mechanism is effective, it does not provide real-time information to motorists.
(c)Recent advances in technology have made it possible to create a reliable, effective, and comprehensive network of digital signs that combine text with graphics in order to rapidly and clearly communicate important emergency and public service information to the users of Californias highways more safely and effectively than the current methods. This advanced technology digital network would increase the efficacy and reliability of this information transmission by increasing the number and visibility of signs providing emergency and public service information, thereby enhancing the safety and travel experience of the people of California, and function as an extension and improvement of the existing California public information and emergency messaging communication efforts.
(d)The establishment and operation of an advanced digital network should be accomplished at no cost to the state through a public-private partnership, where the private partner erects and operates the network, but is allowed to earn revenues from advertising when signs on the network are not used for public purposes.
(e)Revenues to the state generated by the advanced digital network would provide additional funding for transportation and safety initiatives such as additional highway maintenance and repair, in return for the right to place advertisements on the advanced digital network in a manner that is consistent with, and supports, the networks safety and public communication functions.
(f)The advanced digital network signs shall be located and installed in accordance with department guidelines for orientation toward motorists on the traveled way and shall have minimal impact outside of those rights-of-way.
(g)The authority to use the advanced digital network for commercial advertising shall require that the advertising and department messaging, when displayed in combination, are determined to be safe and do not create an unsafe distraction to motorists, and is subject to any required prior authorization under federal law.
172.4.For purposes of this article, the following terms mean the following:
(a)Advance digital network means an integrated network of digital signs. The advanced digital network shall consist of new digital signs at locations as determined by the department.
(b)Agreement means a legally enforceable agreement for the project to install and operate an advanced digital network, including, but not limited to, a license, lease, highway improvement agreement, easement, encroachment permit, or operation and maintenance agreement.
(c)Best value means a value determined by objective criteria that may include, but are not limited to, revenues to the state, features, experience, functions, life cycle costs, price, the capability to develop and incorporate advanced technologies, and other criteria deemed appropriate by the department.
(d)Contracting entity or lessee means a public or private entity, or consortia thereof, that has entered into a comprehensive development lease agreement with the department for a project pursuant to this section.
(e)Design-build means a procurement process in which both the design and construction of a project are procured from a single entity.
(f)Digital sign means a department-owned or controlled sign or official sign that is designed to display various messages that provide information to the public, as well as advertising, by mechanical or electronic means centrally controlled through a network, including, but not limited to, digital and light-emitting diode (LED) technologies.
(g)Project means to study, plan, design, construct, develop, finance, maintain, rebuild, improve, repair, lease, operate, or any combination of these, a state-of-the-art, full-color network of digital signs within the rights-of-way of the state highway system.
172.6.(a)Notwithstanding any other law, and subject to any required federal approval authorizing the department to do so, the department may solicit proposals, accept unsolicited proposals, negotiate, and enter into a comprehensive development lease agreement with a public or private entity, or consortia thereof, to conduct a single project, in a manner that best effectuates the purposes of this article, to install and operate new digital signs within the state highway right-of-way, in a manner to best effectuate the purposes of this article. If the department is advised by the United States Department of Transportation, or any of its agencies, that a display of advertising authorized by this article would result in the reduction of federal aid highway funds to the state pursuant to Section 131 of Title 23 of the United States Code, that display of advertising shall not be made. The department shall conduct a best value competitive procurement and negotiate an initial agreement to become effective upon obtaining any necessary federal authorization. The department may provide services for which it is reimbursed with respect to preliminary design, inspection, and oversight of the project.
(b)The agreement shall provide that the contracting entity with which the agreement is entered into will bear all reasonable costs of the project, including, but not limited to, costs of installation, maintenance, and operation of the project.
(c)The agreement described in subdivision (a) shall do all of the following:
(1)Provide for construction, operation, and maintenance of a network of new digital signs at locations selected for the project.
(2)Provide for complete reversion of any ownership interest in any of the privately constructed, improved, operated, and maintained digital signs to the department at the expiration of the agreement at no charge to the department and free and clear of any liens or encumbrances.
(3)Provide that all department emergency notifications shall have priority over other messaging, including advertising.
(4)Provide that the department, in consultation with the Department of the California Highway Patrol, shall retain the ability to make a determination on the safety of the digital signs, and may take those actions deemed necessary to protect public safety.
(5)Require that the agreement entered into pursuant to this section include indemnity, defense, and hold harmless provisions agreed to by the department and the contracting entity, including provisions for indemnifying the State of California against any claims or losses resulting or accruing from the performance of the contracting entity, including advertising on the advanced digital network, excluding any advertising approved in advance or provided by the department.
(6)Provide for the contracting entity with which the agreement is made to contract and receive funds for the placement of commercial advertisements on the advanced digital network, except during times and to the extent the signs are in use by the department and to share revenues generated in connection with the use of those signs for commercial advertising in furtherance of the public interest.
(d)The advanced digital network to be constructed pursuant to this article shall, during the term of the agreement, be deemed to be a part of the state highway system for purposes of identification, maintenance, and enforcement of traffic laws, and part of the state highway system for emergency notification and other public service information purposes and for the purposes of Division 3.6 (commencing with Section 810) of Title 1 of the Government Code.
(e)Revenues from the advanced digital network shall be allocated between the contracting entity with which the agreement is made and the department in accordance with the agreement as provided in paragraph (6) of subdivision (c). Revenue derived from the project and received by the department, or any other revenue generated from advertising on the advanced digital network owned by the department, and received by the department, shall be deposited in the State Highway Account in the State Transportation Fund. This revenue shall not be subject to the transfer under Section 183.1 or any successor to that section. Revenues deposited under this section shall be retained in the State Highway Account, subject to appropriation by the Legislature, consistent with the provisions of any federal authorization.
(f)The digital signs shall meet the design, construction, and operating requirements in the departments standards and guidelines, including, but not limited to, controls, such as state-of-the-art sensors that control the brightness of the display based on the surrounding ambient light levels and other technologies muting adjacent glare, that focus the zone of vision toward motorists on the traveled way and prevent neighborhood impacts in the vicinity of the digital signs.
(g)The department shall retain the ultimate right to determine whether the location for the placement of a digital sign has or will negatively impact a residential area or community. If the department determines that the location of a digital sign has or will have a negative impact on a residential area or community, the department may, in its discretion, impose additional requirements on its lighting or placement, require a different placement, not allow its placement, or require its removal.
(h)For the purpose of facilitating the project, the agreement between the parties may include provisions for the lease of rights-of-way in, and airspace over or under, highways, public streets, rail, or related facilities, for the granting of necessary easements, and for the issuance of permits or other authorizations to enable the construction of the project. Facilities subject to an agreement under this section shall, at all times, be owned by the department.
(i)The agreement shall require digital signs on the state highway system to meet all requirements for noise mitigation, landscaping, pollution control, and safety that otherwise would apply if the department were designing, building, and operating the project.
172.8.The department may exercise any power possessed by it with respect to transportation projects to facilitate the project pursuant to this article. The department may provide services to the contracting entity for which the department is reimbursed, including, but not limited to, planning, environmental planning, environmental certification, environmental review, preliminary design, design, right-of-way acquisition, construction, maintenance, and policing of the project. The department shall regularly inspect the advanced digital network and require the contracting entity to maintain and operate the advanced digital network according to adopted standards. Except as may otherwise be set forth in the agreement, the contracting entity shall be responsible for all costs due to development, maintenance, repair, rehabilitation, and reconstruction, and operating costs.
172.9.Advertising on the advanced digital network shall be in the form and under those conditions as may be determined by the department and as may be set forth in standards, guidelines, and procedures adopted by the department. The advertising shall not compromise safety or the departments safety communication functions. The network shall enhance public messaging, including, but not limited to, safety campaigns, emergency notifications, travel times, and traveler information and the function of the advanced digital network. All digital signs subject to this article shall be exempt from Section 5408 of the Business and Professions Code and from any and all regulations promulgated in connection with Section 5408 of the Business and Professions Code.
173.The department shall not enter into an agreement with any contracting entity that would cause or permit any digital sign to display or advertise alcohol, tobacco, firearms, sexually explicit material, political messages or advertisements, or any illegal activity. The department shall adopt policies and guidelines in connection with the content and formatting of the advertising.
173.2.The department may use the digital signs for emergency messages, as needed, and dedicated time shall be provided to the department to use the advanced digital network for traveler information and motorist safety and awareness campaigns and any other public service messaging desired by the state, without providing compensation to the contracting entity with which it enters into an agreement pursuant to this article.
173.4.(a)When choosing the contracting entity with which to enter into an agreement pursuant to Section 172.6 to effectuate the purposes of this article, the department may utilize, but is not limited to utilizing, one or more of the following procurement approaches:
(1)Solicitations of proposals for defined projects and calls for project proposals within defined parameters.
(2)Prequalification and short-listing of proposers prior to final evaluation of proposals.
(3)Final evaluation of proposals based on qualifications and best value.
(4)Negotiations with proposers prior to award.
(5)Acceptance of unsolicited proposals, with issuance of requests for competing proposals.
(b)When evaluating a proposal submitted by the contracting entity or lessee, the department or the regional transportation agency may award a contract on the basis of best value.
(c)The department may retain a consultant or adviser to assist in preparing the best value criteria, selection of a contracting entity, and oversight of the project. The consultant or adviser shall not bid on the project or, before one year following award of a contract, work as an officer or employee of, or consultant or adviser to, any contracting entity or entities seeking to bid on the project.
(d)The contracting entity shall have the following qualifications:
(1)Evidence that the members of the contracting entity have completed, or have demonstrated the experience, competency, capability, and capacity to complete, a project of similar size, scope, or complexity, and that proposed key personnel have sufficient experience and training to competently manage and complete the design and construction of the project, and a financial statement that ensures that the contracting entity or lessee has the capacity to complete the project.
(2)The licenses, registration, and credentials required to design and construct the project, including, but not limited to, information on the revocation or suspension of any license, credential, or registration.
(3)Evidence that establishes that members of the contracting entity or lessee have the capacity to obtain all required payment and performance bonding, liability insurance, and errors and omissions insurance.
(4)Evidence that the contracting entity or lessee has workers compensation experience, history, and a worker safety program of members of the contracting entity or lessee that is acceptable to the department or regional transportation agency.
(5)A full disclosure regarding all of the following with respect to each member of the contracting entity or lessee during the past five years:
(A)Any serious or willful violation of Part 1 (commencing with Section 6300) of Division 5 of the Labor Code or the federal Occupational Safety and Health Act of 1970 (Public Law 91-596).
(B)Any instance in which members of the contracting entity or lessee were debarred, disqualified, or removed from a federal, state, or local governmental public works project.
(C)Any instance where members of the contracting entity, or its owners, officers, or managing employees submitted a bid on a public works project and were found to be nonresponsive or were found by an awarding body not to be a responsible bidder.
(D)Any instance where members of the contracting entity or lessee, or its owners, officers, or managing employees defaulted on a construction contract.
(E)Any violations of the Contractors State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code), including, but not limited to, alleged violations of federal or state law regarding the payment of wages, benefits, apprenticeship requirements, or personal income tax withholding, or Federal Insurance Contributions Act (FICA) withholding requirements.
(F)Any bankruptcy or receivership of any member of the contracting entity or lessee, including, but not limited to, information concerning any work completed by a surety.
(G)Any settled adverse claims, disputes, or lawsuits between the owner of a public works project and any member of the contracting entity or lessee during the five years preceding submission of a bid under this article, in which the claim, settlement, or judgment exceeds fifty thousand dollars ($50,000). Information shall also be provided concerning any work completed by a surety during this five-year period.
173.6.Within one year following implementation of the project, the department shall submit a report to the fiscal and policy committees of the Legislature with jurisdiction over transportation matters. The report shall include, but not be limited to, all of the following:
(a)The status of implementation of the agreement, including the number of digital signs placed and the locations of the digital signs placed.
(b)The amount of revenue received, cost savings to the department, and the costs incurred by the department with respect to the project, including costs incurred prior to the time the department entered into an agreement.
(c)An assessment of the effect the project has had on public safety, emergency notification, traveler information, and motorist safety and awareness campaigns.
(d)A description of the types of advertising content displayed on the digital signs.
173.8.The provisions of this article are severable. If any provision of this article or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
SECTION 1.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.(D)Minimize impacts on ratepayers bills.(E)Ensure system and local reliability.(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.(G)Enhance distribution systems and demand-side energy management.(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.(2)Each electrical corporations plan shall follow the provisions of Section 454.5.(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.(C)The resource adequacy requirements established pursuant to Section 380.(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.(d)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.SEC. 1.5.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.(D)Minimize impacts on ratepayers bills.(E)Ensure system and local reliability.(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.(G)Enhance distribution systems and demand-side energy management.(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.(2)Each electrical corporations plan shall follow the provisions of Section 454.5.(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.(C)The resource adequacy requirements established pursuant to Section 380.(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.(d)To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.(e)This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing with January 1, 2013. SEC. 2.Section 9621 of the Public Utilities Code is amended to read:9621.(a)This section shall apply to a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing January 1, 2013.(b)On or before January 1, 2019, the governing board of a local publicly owned electric utility shall adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility achieves all of the following:(1)Meets the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each local publicly owned electric utility that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.(2)Ensures procurement of at least 50 percent eligible renewable energy resources by 2030 consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division 1.(3)Meets the goals specified in subparagraphs (D) to (H), inclusive, of paragraph (1) of subdivision (a) of Section 454.52, and the goal specified in subparagraph (C) of paragraph (1) of subdivision (a) of Section 454.52, as that goal is applicable to each local publicly owned electric utility. A local publicly owned electric utility shall not, solely by reason of this paragraph, be subject to requirements otherwise imposed on electrical corporations.(c)In furtherance of the requirements of subdivision (b), the governing board of a local publicly owned electric utility shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each utility meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers. (d)(1)The integrated resource plan shall address procurement for the following:(A)Energy efficiency and demand response resources pursuant to Section 9615.(B)Energy storage requirements pursuant to Chapter 7.7 (commencing with Section 2835) of Part 2 of Division 1.(C)Transportation electrification.(D)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.(E)The resource adequacy requirements established pursuant to Section 9620.(2)(A)The governing board of the local publicly owned electric utility may authorize all source procurement that includes various resource types, including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, to ensure that the local publicly owned electric utility procures the optimum resource mix that meets the objectives of subdivision (b).(B)The governing board may authorize procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in subdivision (b), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.(e)A local publicly owned electric utility shall satisfy the notice and public disclosure requirements of subdivision (f) of Section 399.30 with respect to any integrated resource plan or plan update it considers.SEC. 3.Section 1.5 of this bill incorporates amendments to Section 454.52 of the Public Utilities Code proposed by both this bill and Assembly Bill 759. That section of this bill shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2018, (2) each bill amends Section 454.52 of the Public Utilities Code, and (3) this bill is enacted after Assembly Bill 759, in which case Section 1 of this bill shall not become operative.SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.(a)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of clean energy technology, demand response, and energy efficiency existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets net-load peak energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(c)(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(d)(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(e)(d)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
SEC. 1.5.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Commencing Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)In order to To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
(e)This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing with January 1, 2013.
SEC. 2.Section 9621 of the Public Utilities Code is amended to read:9621.(a)For purposes of this section, net-load peak means the daily period of three or more consecutive hours in which the latest of the hours is the hour of peak demand for electricity, excluding demand met by variable renewable generation directly connected to the grid operated by the Independent System Operator.(b)9621.(a)This section shall apply to a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing January 1, 2013.
(c)(b)On or before January 1, 2019, the governing board of a local publicly owned electric utility shall adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility achieves all of the following:
(1)Meets the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each local publicly owned electric utility that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(2)Ensures procurement of at least 50 percent eligible renewable energy resources by 2030 consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division 1.
(3)Meets the goals specified in subparagraphs (D) to (H), inclusive, of paragraph (1) of subdivision (a) of Section 454.52, and the goal specified in subparagraph (C) of paragraph (1) of subdivision (a) of Section 454.52, as that goal is applicable to each local publicly owned electric utility. A local publicly owned electric utility shall not, solely by reason of this paragraph, be subject to requirements otherwise imposed on electrical corporations.
(d)(c)In furtherance of the requirements of subdivision (c), (b), the governing board of a local publicly owned electric utility shall consider the role of clean energy technology, demand response, and energy efficiency existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each utility meets net-load peak energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(e)(d)(1)The integrated resource plan shall address procurement for the following:
(A)Energy efficiency and demand response resources pursuant to Section 9615.
(B)Energy storage requirements pursuant to Chapter 7.7 (commencing with Section 2835) of Part 2 of Division 1.
(C)Transportation electrification.
(D)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.
(E)The resource adequacy requirements established pursuant to Section 9620.
(2)(A)The governing board of the local publicly owned electric utility may authorize all source procurement that includes various resource types, including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, to ensure that the local publicly owned electric utility procures the optimum resource mix that meets the objectives of subdivision (b).
(B)The governing board may authorize procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in subdivision (b), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(f)(e)A local publicly owned electric utility shall satisfy the notice and public disclosure requirements of subdivision (f) of Section 399.30 with respect to any integrated resource plan or plan update it considers.
SEC. 3.Section 1.5 of this bill incorporates amendments to Section 454.52 of the Public Utilities Code proposed by both this bill and Assembly Bill 759. That section of this bill shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2018, (2) each bill amends Section 454.52 of the Public Utilities Code, and (3) this bill is enacted after Assembly Bill 759, in which case Section 1 of this bill shall not become operative.
SEC. 3.SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)For purposes of this section, net-load peak means the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by variable renewable generation directly connected to the grid operated by the Independent System Operator.
(b)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall establish policies and procedures, including new targets or requirements for consider the role of clean energy technology, demand response, and energy efficiency, to the extent those policies and procedures efficiency in helping to ensure each load-serving entity meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(c)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(d)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(e)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
SEC. 2.Section 9621 of the Public Utilities Code is amended to read:9621.(a)For purposes of this section, net-load peak means the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by variable renewable generation directly connected to the grid operated by the Independent System Operator.
(b)This section shall apply to a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing January 1, 2013.
(c)On or before January 1, 2019, the governing board of a local publicly owned electric utility shall adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility achieves all of the following:
(1)Meets the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each local publicly-owned publicly owned electric utility that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(2)Ensures procurement of at least 50 percent eligible renewable energy resources by 2030 consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division 1.
(3)Meets the goals specified in subparagraphs (D) to (H), inclusive, of paragraph (1) of subdivision (a) of Section 454.52, and the goal specified in subparagraph (C) of paragraph (1) of subdivision (a) of Section 454.52, as that goal is applicable to each local publicly owned electric utility. A local publicly owned electric utility shall not, solely by reason of this paragraph, be subject to requirements otherwise imposed on electrical corporations.
(d)In furtherance of the requirements of subdivision (c), the governing board of a local publicly owned electric utility shall establish policies and procedures, including new targets or requirements for consider the role of clean energy technology, demand response, and energy efficiency, to the extent that those policies and procedures efficiency in helping to ensure each utility meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(e)(1)The integrated resource plan shall address procurement for the following:
(A)Energy efficiency and demand response resources pursuant to Section 9615.
(B)Energy storage requirements pursuant to Chapter 7.7 (commencing with Section 2835) of Part 2 of Division 1.
(C)Transportation electrification.
(D)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.
(E)The resource adequacy requirements established pursuant to Section 9620.
(2)(A)The governing board of the local publicly owned electric utility may authorize all source procurement that includes various resource types, including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, to ensure that the local publicly owned electric utility procures the optimum resource mix that meets the objectives of subdivision (b).
(B)The governing board may authorize procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in subdivision (b), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(f)A local publicly owned electric utility shall satisfy the notice and public disclosure requirements of subdivision (f) of Section 399.30 with respect to any integrated resource plan or plan update it considers.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)For purposes of this section, net-load peak means the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by variable renewable generation directly connected to the grid operated by the Independent System Operator.
(b)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall establish policies and procedures, including new targets or requirements for clean energy technology, demand response, and energy efficiency, to the extent those policies and procedures ensure each load-serving entity meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation in achieving the states energy goals at the least cost to ratepayers.
(b)(c)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)(d)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)(e)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
SEC. 2.Section 9621 of the Public Utilities Code is amended to read:9621.(a)For purposes of this section, net-load peak means the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by variable renewable generation directly connected to the grid operated by the Independent System Operator.
(b)This section shall apply to a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing January 1, 2013.
(b)(c)On or before January 1, 2019, the governing board of a local publicly owned electric utility shall adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility achieves all of the following:
(1)Meets the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each local publicly-owned electric utility that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(2)Ensures procurement of at least 50 percent eligible renewable energy resources by 2030 consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division 1.
(3)Meets the goals specified in subparagraphs (D) to (H), inclusive, of paragraph (1) of subdivision (a) of Section 454.52, and the goal specified in subparagraph (C) of paragraph (1) of subdivision (a) of Section 454.52, as that goal is applicable to each local publicly owned electric utility. A local publicly owned electric utility shall not, solely by reason of this paragraph, be subject to requirements otherwise imposed on electrical corporations.
(d)In furtherance of the requirements of subdivision (c), the governing board of a local publicly owned electric utility shall establish policies and procedures, including new targets or requirements for clean energy technology, demand response, and energy efficiency, to the extent that those policies and procedures ensure each utility meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation in achieving the states energy goals at the least cost to ratepayers.
(c)(e)(1)The integrated resource plan shall address procurement for the following:
(A)Energy efficiency and demand response resources pursuant to Section 9615.
(B)Energy storage requirements pursuant to Chapter 7.7 (commencing with Section 2835) of Part 2 of Division 1.
(C)Transportation electrification.
(D)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.
(E)The resource adequacy requirements established pursuant to Section 9620.
(2)(A)The governing board of the local publicly owned electric utility may authorize all source procurement that includes various resource types, including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, to ensure that the local publicly owned electric utility procures the optimum resource mix that meets the objectives of subdivision (b).
(B)The governing board may authorize procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in subdivision (b), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(d)(f)A local publicly owned electric utility shall satisfy the notice and public disclosure requirements of subdivision (f) of Section 399.30 with respect to any integrated resource plan or plan update it considers.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Chapter 8.5 (commencing with Section 2847) is added to Part 2 of Division 1 of the Public Utilities Code, to read:8.5.Clean Peak Energy Standard2847.For purposes of this chapter, the following definitions apply:(a)Clean peak resources means eligible renewable energy resources or energy storage systems.(b)Eligible renewable energy resource has the same meaning as set forth in Section 399.12.(c)Energy storage systems has the same meaning as set forth in Section 2835.(d)Load-serving entity has the same meaning as set forth in Section 380.(e)Peak demand hour means the one hour of each day that exhibits the highest peak demand.(f)Peakload time period means a four-hour time period comprising the one hour prior to and two hours following the peak demand hour.2847.1.(a)(1)The commission shall, by December 31, 2018, determine the actual percentage of kilowatthours delivered by each load-serving entity during the peakload time period to end-use customers in the state that is derived from clean peak resources.(2)The commission shall ensure that each load-serving entity, in addition to the percentage determined pursuant to paragraph (1), procures a minimum percentage of kilowatthours delivered during the peakload time period from clean peak resources on at least 15 days every month in accordance with the following schedule:(A)An additional 5 percent of electricity delivered during the peakload time period on the required number of days each month in the year 2020 shall be supplied by clean peak resources.(B)An additional 6 percent of electricity delivered during the peakload time period on the required number of days each month shall be supplied by clean peak resources every third year thereafter until December 31, 2029, or until 40 percent of demand during the peakload time period is supplied by clean peak resources, whichever occurs earlier.(3)Contributions toward the standard set pursuant to paragraph (2) from an energy storage system shall be prorated based on the share of renewable energy resources used to charge the energy storage system.(4)Clean peak resources shall use Independent System Operator-approved performance measurement solutions.(5)The commission shall ensure the clean peak resources provide benefits to the grid.(6)The commission shall determine an appropriate mechanism for determining compliance with the clean peak standard, which may include the use of tradeable credits.(7)The commission shall consider clean flexible capacity procurement targets to encourage deployment of clean peak resources to provide additional ancillary and ramping services.(b)(1)Each local publicly owned electric utility shall, by December 31, 2018, determine the actual percentage of kilowatthours delivered during the peakload time period to its end-use customers that is derived from clean peak resources.(2)Each local publicly owned electric utility, in addition to the percentage determined pursuant to paragraph (1), shall procure a minimum percentage of kilowatthours delivered during the peakload time period from clean peak resources on at least 15 days every month in accordance with the following schedule:(A)An additional 5 percent of electricity delivered during the peakload time period on the required number of days each month in the year 2020 shall be supplied by clean peak resources.(B)An additional 6 percent of electricity delivered during the peakload time period on the required number of days each month shall be supplied by clean peak resources every third year thereafter until December 31, 2029, or until 40 percent of demand during the peakload time period is supplied by clean peak resources, whichever occurs earlier.(3)Each local publicly owned electric utility shall ensure the clean peak resources provide benefits to the grid.SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.For purposes of this chapter, the following definitions apply:
(a)Clean peak resources means eligible renewable energy resources or energy storage systems.
(a)(b)Eligible renewable energy resource has the same meaning as set forth in Section 399.12.
(b)(c)Energy storage systems has the same meaning as set forth in Section 2835.
(c)(d)Load-serving entity has the same meaning as set forth in Section 380.
(d) Median peak demand time(e)Peak demand hour means the time that is calculated by determining the four months out of the year that have historically exhibited the highest peak demand, determining the time with the highest demand during each of those months over the previous five-year period, and determining the median from those 20 discrete times. one hour of each day that exhibits the highest peak demand.
(e)(f)Peakload time period means a four-hour time period comprising the two hours one hour prior to and two hours following the median peak demand time. hour.
2847.1.(a)The commission shall ensure that ____ percent of the energy delivered to ratepayers during the peakload time period by each load-serving entity is derived from eligible renewable energy resources or energy storage systems that provide ratepayer benefits to the grid.(b)Each local publicly owned electric utility shall ensure that ____ percent of the energy delivered to ratepayers during the peakload time period is derived from eligible renewable energy resources or energy storage systems that provide ratepayer benefits to the grid.2847.1.(a)(1)The commission shall, by December 31, 2018, determine the actual percentage of kilowatthours delivered by each load-serving entity during the peakload time period to end-use customers in the state that is derived from clean peak resources.
(2)The commission shall ensure that each load-serving entity, in addition to the percentage determined pursuant to paragraph (1), procures a minimum percentage of kilowatthours delivered during the peakload time period from clean peak resources on at least 15 days every month in accordance with the following schedule:
(A)An additional 5 percent of electricity delivered during the peakload time period on the required number of days each month in the year 2020 shall be supplied by clean peak resources.
(B)An additional 6 percent of electricity delivered during the peakload time period on the required number of days each month shall be supplied by clean peak resources every third year thereafter until December 31, 2029, or until 40 percent of demand during the peakload time period is supplied by clean peak resources, whichever occurs earlier.
(3)Contributions toward the standard set pursuant to paragraph (2) from an energy storage system shall be prorated based on the share of renewable energy resources used to charge the energy storage system.
(4)Clean peak resources shall use Independent System Operator-approved performance measurement solutions.
(5)The commission shall ensure the clean peak resources provide benefits to the grid.
(6)The commission shall determine an appropriate mechanism for determining compliance with the clean peak standard, which may include the use of tradeable credits.
(7)The commission shall consider clean flexible capacity procurement targets to encourage deployment of clean peak resources to provide additional ancillary and ramping services.
(b)(1)Each local publicly owned electric utility shall, by December 31, 2018, determine the actual percentage of kilowatthours delivered during the peakload time period to its end-use customers that is derived from clean peak resources.
(2)Each local publicly owned electric utility, in addition to the percentage determined pursuant to paragraph (1), shall procure a minimum percentage of kilowatthours delivered during the peakload time period from clean peak resources on at least 15 days every month in accordance with the following schedule:
(A)An additional 5 percent of electricity delivered during the peakload time period on the required number of days each month in the year 2020 shall be supplied by clean peak resources.
(B)An additional 6 percent of electricity delivered during the peakload time period on the required number of days each month shall be supplied by clean peak resources every third year thereafter until December 31, 2029, or until 40 percent of demand during the peakload time period is supplied by clean peak resources, whichever occurs earlier.
(3)Each local publicly owned electric utility shall ensure the clean peak resources provide benefits to the grid.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
For purposes of this chapter, the following definitions apply:
(a)Eligible renewable energy resource has the same meaning as set forth in Section 399.12.
(b)Energy storage systems has the same meaning as set forth in Section 2835.
(c)Load-serving entity has the same meaning as set forth in Section 380.
(d)Median peak demand time means the time that is calculated by determining the four months out of the year that have historically exhibited the highest peak demand, determining the time with the highest demand during each of those months over the previous five-year period, and determining the median from those 20 discrete times.
(e)Peakload time period means a four-hour time period comprising the two hours prior to and two hours following the median peak demand time.
2847.1.(a)The commission shall ensure that ____ percent of the energy delivered to ratepayers during the peakload time period by each load-serving entity is derived from eligible renewable energy resources or energy storage systems that provide ratepayer benefits to the grid.
(b)Each local publicly owned electric utility shall ensure that ____ percent of the energy delivered to ratepayers during the peakload time period is derived from eligible renewable energy resources or energy storage systems that provide ratepayer benefits to the grid.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Jun 26, 2018 | In committee: Set, second hearing. Hearing canceled at the request of author. |
| Jun 19, 2018 | In committee: Set, first hearing. Hearing canceled at the request of author. |
| Jun 13, 2018 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on T. & H. |
| Feb 26, 2018 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on T. & H. |
| Feb 14, 2018 | Re-referred to Coms. on T. & H. and JUD. |
| Sep 11, 2017 | Re-referred to Com. on RLS. pursuant to Senate Rule 29.10(c). |
| Sep 11, 2017 | Read second time. Ordered to third reading. |
| Sep 8, 2017 | Read third time and amended. Ordered to second reading. |
| Sep 5, 2017 | Read second time. Ordered to third reading. |
| Sep 1, 2017 | From committee: Amend, and do pass as amended. (Ayes 5. Noes 2.) (September 1). |
| Aug 21, 2017 | In committee: Referred to APPR. suspense file. |
| Jul 17, 2017 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 13, 2017 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 8. Noes 2.) (July 10). |
| Jun 28, 2017 | In committee: Hearing postponed by committee. |
| Jun 14, 2017 | Referred to Com. on E., U. & C. |
| Jun 5, 2017 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Jun 1, 2017 | Read third time. Passed. Ordered to the Senate. (Ayes 43. Noes 31. Page 2073.) |
| May 30, 2017 | Read second time. Ordered to third reading. |
| May 26, 2017 | From committee: Do pass. (Ayes 11. Noes 6.) (May 26). |
| May 17, 2017 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| May 3, 2017 | Re-referred to Com. on APPR. |
| May 2, 2017 | Read second time and amended. |
| May 1, 2017 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 10. Noes 4.) (April 26). |
| Apr 19, 2017 | In committee: Hearing postponed by committee. |
| Mar 21, 2017 | Re-referred to Com. on U. & E. |
| Mar 20, 2017 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Mar 13, 2017 | Referred to Coms. on U. & E. and NAT. RES. |
| Feb 19, 2017 | From printer. May be heard in committee March 21. |
| Feb 17, 2017 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 1, 2017 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| Aug 21, 2017 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jul 10, 2017 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
|
| Jun 1, 2017 | AB 1405 MULLIN Assembly Third Reading | Assembly Floor |
Passed |
|
| May 26, 2017 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 26, 2017 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Energy |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
SENATE COMMITTEE ON TRANSPORTATION AND HOUSING
Senator Jim Beall, Chair
2017 - 2018 Regular
Bill No: AB 1405 Hearing Date: 6/26/2018
Author: | Mullin | ||
Version: | 6/13/2018 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Randy Chinn | ||
SUBJECT: Digital sign demonstration pilot program.
DIGEST: This bill authorizes the California Department of Transportation (Caltrans) to establish a pilot project for advertising on state rights of way, subject to federal approval.
ANALYSIS:
Existing law:
- Requires all states to adopt the federal Manual on Uniform Traffic Control Devices (MUTCD), or to at least substantially comply with it. The federal MUTCD prescribes standards for signs, signals, markings, and other devices used to guide traffic on streets and highways throughout the country. California has adopted its own MUTCD, which has been approved by federal officials as being “substantially in compliance” with the federal MUTCD.
- Provides that traffic control devices or their supports shall not bear any advertising message or any other message that is not related to traffic control.
- Provides that only those traffic control devices that conform to the California MUTCD may be placed on a street or highway.
- Establishes the Outdoor Advertising Act (OAA), which regulates the placement of advertising displays adjacent to and within specified distances of highways that are part of the national system of interstate, defense highways, and federal-aid highways.
- Prohibits any advertising display from being placed or maintained on property adjacent to a section of a freeway that has been landscaped if the advertising display is designed to be viewed primarily by persons traveling on the main-traveled way of the landscaped freeway.
This bill:
- Authorizes a pilot program until 2024 for digital advertising signs within the state right of way consistent with the program described in a recent Caltrans feasibility study. Features of the program include:
- Authorizes up to 25 signs with no cost to the state.
- Caltrans has discretion to select sign locations.
- After the installation costs are recovered by the contractor, advertising revenue is split with at least 50% going to the state.
- Signs shall meet Caltrans’ design, construction and operating standards.
- Signs shall enhance public messaging, including safety campaigns, emergency notification, travel times, and traveler information.
- State emergency notifications have priority over all messaging, including advertising.
- Caltrans may establish guidelines and standards for advertising; advertising of alcohol, tobacco, firearms, sexually explicit material, political messages, or any illegal activity is not permitted.
- Caltrans retains the ability to determine the safety of the signs and to take whatever actions are necessary to protect public safety.
- State is indemnified from any claims or losses.
- State owns the signs after the pilot program ends.
- Subject to federal approval.
- Establishes minimum qualifications for an entity contracted to install and operate the signs, including demonstrated experience, required licenses, and financial capacity.
- Requires annual reporting to the Legislature regarding the project status, safety impact, and revenue received.
- Requires any advertising revenue to be deposited into the State Highway Account, subject to appropriation consistent with the provisions of any federal authorization.
COMMENTS
- Author’s Stated Purpose. The purpose of AB 1405 is to authorize an enterprise initiative between Caltrans and the private sector for a new, state-of-the-art, digital sign network to provide real-time information for enhanced statewide emergency and traveler communications – at no cost to the State.
- Driving to Distraction. Advertising is intended to attract attention, which by definition distracts from the task of driving. Allowing advertising on the highway right of way, and potentially over the highway itself, raises safety issues; advertising is currently barred in the highway right of way for a reason. Moreover, we are in a period where driving is becoming less safe, despite having vehicles which are safer than ever. The National Safety Council found that 40,100 people were killed while driving in 2017, an increase of 6% from 2015. It certainly appears that more drivers are distracted than ever. Given this context, allowing advertising for the first time ever in the highway right of way must be very carefully considered.
In addition to advertising, the digital displays envisioned in this bill can also provide information that is useful to drivers, such as expected driving times, hazard warnings and emergency alerts. They may be useful in natural disasters to communicate news and direct traffic.
- California Mad Men. The state can earn revenue by hosting advertising: A single digital billboard can bring in $500,000 annually. Were California to develop a network of digital signs along the major state highways, the state would control a new and powerful advertising media, outshining other billboards and outdoor advertising displays which are less optimally located. Supporters of this bill suggest revenue potential in the hundreds of millions of dollars annually. This creates new competition which conflicts with the interests of local governments, who receive revenue from advertising displays they permit. And for the outdoor advertising industry, a large state advertising network could only be developed and managed by a large firm, disadvantaging the smaller outdoor advertising companies. More generally, the additional outdoor advertising signs allowed by this bill will increase the supply of outdoor advertising space, thereby driving down the price for advertising in the outdoor advertising market, which is bad news for the outdoor advertising companies owning that space and the local governments who share in those revenues.
- Permission, not Forgiveness. Federal law requires all states to comply with the federal MUTCD, or to be substantially compliant with it. To utilize changeable message signs (CMS) for advertising, Caltrans must seek a waiver from the federal government. If Caltrans were to use the CMS as required in this bill without the receipt of a waiver, the Federal Highway Administration (FHWA) would be authorized by federal law to withhold 10% of the transportation funds California receives from the federal government.
Recent experience suggests that such permission is unlikely to be granted. Earlier this year the FHWA penalized New York $14 million for allowing advertising on highway signs.[1] Trade journals report that a Texas Department of Transportation request to sell corporate sponsorships on overhanging signs was also rejected. In a response to a citizen suggesting that advertising be placed on the back of overhead traffic signs, the Associate Administrator for Operations at FHWA noted that “Signs on the highways are limited to those that will promote the safe and efficient utilization of the highways. In addition, all real property within the right-of-way boundaries must be devoted exclusively to public highway purposes.”
- Neither Fish nor Fowl. Supporters envision a different type of advertising sign which they believe will fare better with the FHWA. Rather than adding advertising to a CMS the supporters would instead offer a stand-alone digital billboard which provided traffic information infrequently. That would theoretically reduce driver distraction because it would be separate from the traffic information provided on the CMS. And because the sign would rarely offer traffic information it would theoretically not be subject to the MUTCD. Such standalone signs would be permitted under this bill if Caltrans and the FHWA approved. But again, given the recent, strong, and consistent denials of advertising proposals by the FHWA, it is difficult to see such a proposal being approved.
- One Step on a Path Forward. Pursuant to law, Caltrans has recently issued a report describing a feasible pilot project on advertising on CMS which would evaluate any potential safety implications and assess how much potential revenue could be generated to support CMS infrastructure and the State highway system as a whole. Safety is a paramount consideration, with any pilot crafted to manage the risk of distraction to drivers, including inattention to other safety notices and signs, such as the AMBER alert program. Caltrans notes such a pilot would need federal approval which, given FHWA’s recent track record, is unlikely. This bill is intended to be entirely consistent with the Caltrans report.
- Going Slow. The pilot program established by this bill reflects the conservative approach taken by Caltrans emphasizing the concern for public safety and the benefits of more information to the driving public, rather than emphasizing the pursuit of advertising revenue which would come from a full-fledged state digital advertising program.
- There, Not Here. Caltrans determines the locations of the digital signs. Opponents are concerned that Caltrans could choose to place signs in cities which have imposed outdoor advertising bans or near city-owned billboards. Proposed amendments, described below, prohibit any new sign, or conversion of an existing sign, where there is an existing local prohibition.
- Substantial Amendments. The author will accept the following amendments, which prohibit any new billboards from being installed where a local jurisdiction has an existing billboard prohibition, and which clarify the indemnification of the state. With these amendments the Judiciary Committee will waive its hearing on the bill.
Add new 172.4(d) as follows:
The department shall not authorize the installation of a new digital sign or the conversion of an existing changeable message sign to a digital sign under the program in a city or county where a prohibition on new outdoor advertising or general advertising structures was enacted through an ordinance or local initiative before January 1, 2019.
Amend 172.6(c)(5) as follows:
Require that the agreement entered into pursuant to this section include indemnity, defense, and hold harmless provisions agreed to by the department and the contracting entity, including provisions for indemnifying which must indemnify the State of California against any claims or losses resulting or accruing from the performance of the contracting entity, including advertising on the digital signs, excluding any advertising approved in advance or provided by the department. This paragraph does not require the agreement to include any obligation of the State of California to indemnify, defend, or hold harmless the contracting entity.
Related Legislation:
AB 3168 (Rubio, 2018) — Provides more specificity and flexibility for Caltrans to relocate and site outdoor advertising. This bill is pending in the Senate Appropriations Committee.
SB 1397 (Huff, 2016) — would have established a program for advertising on state rights of way similar to AB 1405. This bill died on the Senate floor.
SB 853 (Committee on Budget and Fiscal Review, Chapter 27, Statutes of 2014) — required Caltrans to report to the Legislature by January 10, 2015, on the subject of advertising on electronic CMS on the state highway system, and on the feasibility of a pilot project in that regard, including estimates of revenue.
SB 854 (Committee on Budget and Fiscal Review, 2010) — would have authorized Caltrans to lease space for advertisements on digital messaging signs on the state highway system that are currently used for traveler information. These changes in statute would have required Caltrans receive a federal waiver before entering into any contract for advertisements on digital messaging signs and would have required that any such contract be provided to the legislature for a 30-day review prior to enactment. This bill failed passage on the Senate floor.
AB 1614 (Committee on Budget, 2010) — would have authorized an experimental program that would allow advertising on upgraded CMS on highway right of way. A federal waiver, or a change in federal law, was necessary to implement this program, and this bill stated the program cannot be implemented unless approved by the federal government. This bill failed passage on the Senate floor.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
POSITIONS: (Communicated to the committee before noon on Wednesday,
June 20, 2018.)
SUPPORT:
Associated General Contractors
Building and Construction Trades Council of Alameda County
California Nevada Cement Association
Crime Survivors Resource Center
Greater Los Angeles African American Chamber of Commerce
Intelligent Sign Network
National Center for Victims of Crime
Outfront Media
Ron Goldman Foundation for Justice
San Francisco Fire Fighters Local 798
State Building and Construction Trades Council
Board of Equalization Member George Runner
OPPOSITION:
Bulletin Displays, LLC
California State Association of Counties
City of Baldwin Park
City of Bellflower
City of Buena Park
City of Carson
City of Compton
City of Dixon
City of Eastvale
City of Lynwood
City of Rohnert Park
City of Santa Fe Springs
City of South Gate
City of Thousand Oaks
Coalition to Ban Billboard Blight
General Outdoor Advertising
Lamar Advertising
League of California Cities
Mayors’ and Councilmembers Association of Sonoma County
Meadow Outdoor Advertising
Scenic San Diego
Sonoma County Board of Supervisors
Stott Outdoor Advertising
Town of Los Gatos
Veale Outdoor Advertising
51 individuals
-- END --
The impermissible advertising was static, not digital, and was limited to state tourism, including the iconic “I♥NY” as well as a related website address. The FHWA’s penalty letter noted that “Motorist safety is always our primary objective.” ↑
SENATE COMMITTEE ON TRANSPORTATION AND HOUSING
Senator Jim Beall, Chair
2017 - 2018 Regular
Bill No: Hearing Date: 6/19/2018
Author: | Mullin | ||
Version: | 6/13/2018 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Randy Chinn | ||
SUBJECT: Digital sign demonstration pilot program.
DIGEST: This bill authorizes the California Department of Transportation (Caltrans) to establish a pilot project for advertising on state rights of way, subject to federal approval.
ANALYSIS:
Existing law:
- Requires all states to adopt the federal Manual on Uniform Traffic Control Devices (MUTCD), or to at least substantially comply with it. The federal MUTCD prescribes standards for signs, signals, markings, and other devices used to guide traffic on streets and highways throughout the country. California has adopted its own MUTCD, which has been approved by federal officials as being “substantially in compliance” with the federal MUTCD.
- Provides that traffic control devices or their supports shall not bear any advertising message or any other message that is not related to traffic control.
- Provides that only those traffic control devices that conform to the California MUTCD may be placed on a street or highway.
- Establishes the Outdoor Advertising Act (OAA), which regulates the placement of advertising displays adjacent to and within specified distances of highways that are part of the national system of interstate, defense highways, and federal-aid highways.
- Prohibits any advertising display from being placed or maintained on property adjacent to a section of a freeway that has been landscaped if the advertising display is designed to be viewed primarily by persons traveling on the main-traveled way of the landscaped freeway.
This bill:
- Authorizes a pilot program until 2024 for digital advertising signs within the state right of way consistent with the program described in a recent Caltrans feasibility study. Features of the program include:
- Authorizes up to 25 signs with no cost to the state.
- Caltrans has discretion to select sign locations.
- After the installation costs are recovered by the contractor, advertising revenue is split with at least 50% going to the state.
- Signs shall meet Caltrans’ design, construction and operating standards.
- Signs shall enhance public messaging, including safety campaigns, emergency notification, travel times, and traveler information.
- State emergency notifications have priority over all messaging, including advertising.
- Caltrans may establish guidelines and standards for advertising; advertising of alcohol, tobacco, firearms, sexually explicit material, political messages, or any illegal activity is not permitted.
- Caltrans retains the ability to determine the safety of the signs and to take whatever actions are necessary to protect public safety.
- State is indemnified from any claims or losses.
- State owns the signs after the pilot program ends.
- Subject to federal approval.
- Establishes minimum qualifications for an entity contracted to install and operate the signs, including demonstrated experience, required licenses, and financial capacity.
- Requires annual reporting to the Legislature regarding the project status, safety impact, and revenue received.
- Requires any advertising revenue to be deposited into the State Highway Account, subject to appropriation consistent with the provisions of any federal authorization.
COMMENTS
- Author’s Stated Purpose. The purpose of AB 1405 is to authorize an enterprise initiative between Caltrans and the private sector for a new, state-of-the-art, digital sign network to provide real-time information for enhanced statewide emergency and traveler communications – at no cost to the State.
- Driving to Distraction. Advertising is intended to attract attention, which by definition distracts from the task of driving. Allowing advertising on the highway right of way, and potentially over the highway itself, raises safety issues; advertising is currently barred in the highway right of way for a reason. Moreover, we are in a period where driving is becoming less safe, despite having vehicles which are safer than ever. The National Safety Council found that 40,100 people were killed while driving in 2017, an increase of 6% from 2015. It certainly appears that more drivers are distracted than ever. Given this context, allowing advertising for the first time ever in the highway right of way must be very carefully considered.
In addition to advertising, the digital displays envisioned in this bill can also provide information that is useful to drivers, such as expected driving times, hazard warnings and emergency alerts. They may be useful in natural disasters to communicate news and direct traffic.
- California Mad Men. The state can earn revenue by hosting advertising: A single digital billboard can bring in $500,000 annually. Were California to develop a network of digital signs along the major state highways, the state would control a new and powerful advertising media, outshining other billboards and outdoor advertising displays which are less optimally located. Supporters of this bill suggest revenue potential in the hundreds of millions of dollars annually. This creates new competition which conflicts with the interests of local governments, who receive revenue from advertising displays they permit. And for the outdoor advertising industry, a large state advertising network could only be developed and managed by a large firm, disadvantaging the smaller outdoor advertising companies. More generally, the additional outdoor advertising signs allowed by this bill will increase the supply of outdoor advertising space, thereby driving down the price for advertising in the outdoor advertising market, which is bad news for the outdoor advertising companies owning that space and the local governments who share in those revenues.
- Permission, not Forgiveness. Federal law requires all states to comply with the federal MUTCD, or to be substantially compliant with it. To utilize changeable message signs (CMS) for advertising, Caltrans must seek a waiver from the federal government. If Caltrans were to use the CMS as required in this bill without the receipt of a waiver, the Federal Highway Administration (FHWA) would be authorized by federal law to withhold 10% of the transportation funds California receives from the federal government.
Recent experience suggests that such permission is unlikely to be granted. Earlier this year the FHWA penalized New York $14 million for allowing advertising on highway signs.[1] Trade journals report that a Texas Department of Transportation request to sell corporate sponsorships on overhanging signs was also rejected. In a response to a citizen suggesting that advertising be placed on the back of overhead traffic signs, the Associate Administrator for Operations at FHWA noted that “Signs on the highways are limited to those that will promote the safe and efficient utilization of the highways. In addition, all real property within the right-of-way boundaries must be devoted exclusively to public highway purposes.”
- Neither Fish nor Fowl. Supporters envision a different type of advertising sign which they believe will fare better with the FHWA. Rather than adding advertising to a CMS the supporters would instead offer a stand-alone digital billboard which provided traffic information infrequently. That would theoretically reduce driver distraction because it would be separate from the traffic information provided on the CMS. And because the sign would rarely offer traffic information it would theoretically not be subject to the MUTCD. Such standalone signs would be permitted under this bill if Caltrans and the FHWA approved. But again, given the recent, strong, and consistent denials of advertising proposals by the FHWA, it is difficult to see such a proposal being approved.
- One Step on a Path Forward. Pursuant to law, Caltrans has recently issued a report describing a feasible pilot project on advertising on CMS which would evaluate any potential safety implications and assess how much potential revenue could be generated to support CMS infrastructure and the State highway system as a whole. Safety is a paramount consideration, with any pilot crafted to manage the risk of distraction to drivers, including inattention to other safety notices and signs, such as the AMBER alert program. Caltrans notes such a pilot would need federal approval which, given FHWA’s recent track record, is unlikely. This bill is intended to be entirely consistent with the Caltrans report.
- Going Slow. The pilot program established by this bill reflects the conservative approach taken by Caltrans emphasizing the concern for public safety and the benefits of more information to the driving public, rather than emphasizing the pursuit of advertising revenue which would come from a full-fledged state digital advertising program.
- There, Not Here. Caltrans determines the locations of the digital signs. Opponents are concerned that Caltrans could choose to place signs in cities which have imposed outdoor advertising bans or near city-owned billboards.
- Double Referral. This bill has been double-referred to the Judiciary Committee.
Related Legislation:
AB 3168 (Rubio, 2018) — Provides more specificity and flexibility for Caltrans to relocate and site outdoor advertising. This bill is pending in the Senate Appropriations Committee.
SB 1397 (Huff, 2016) — would have established a program for advertising on state rights of way similar to AB 1405. This bill died on the Senate floor.
SB 853 (Committee on Budget and Fiscal Review, Chapter 27, Statutes of 2014) — required Caltrans to report to the Legislature by January 10, 2015, on the subject of advertising on electronic CMS on the state highway system, and on the feasibility of a pilot project in that regard, including estimates of revenue.
SB 854 (Committee on Budget and Fiscal Review, 2010) — would have authorized Caltrans to lease space for advertisements on digital messaging signs on the state highway system that are currently used for traveler information. These changes in statute would have required Caltrans receive a federal waiver before entering into any contract for advertisements on digital messaging signs and would have required that any such contract be provided to the legislature for a 30-day review prior to enactment. This bill failed passage on the Senate floor.
AB 1614 (Committee on Budget, 2010) — would have authorized an experimental program that would allow advertising on upgraded CMS on highway right of way. A federal waiver, or a change in federal law, was necessary to implement this program, and this bill stated the program cannot be implemented unless approved by the federal government. This bill failed passage on the Senate floor.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
POSITIONS: (Communicated to the committee before noon on Wednesday,
June 13, 2018.)
SUPPORT:
Associated General Contractors
Building and Construction Trades Council of Alameda County
California Nevada Cement Association
Crime Survivors Resource Center
Greater Los Angeles African American Chamber of Commerce
Intelligent Sign Network
National Center for Victims of Crime
Outfront Media
Ron Goldman Foundation for Justice
San Francisco Fire Fighters Local 798
State Building and Construction Trades Council
Board of Equalization Member George Runner
OPPOSITION:
California State Association of Counties
City of Baldwin Park
City of Bellflower
City of Buena Park
City of Carson
City of Compton
City of Eastvale
City of Lynwood
City of Rohnert Park
City of Santa Fe Springs
City of South Gate
City of Thousand Oaks
Coalition to Ban Billboard Blight
General Outdoor Advertising
Lamar Advertising
League of California Cities
Meadow Outdoor Advertising
Sonoma County Board of Supervisors
Stott Outdoor Advertising
Veale Outdoor Advertising
-- END --
The impermissible advertising was static, not digital, and was limited to state tourism, including the iconic “I♥NY” as well as a related website address. The FHWA’s penalty letter noted that “Motorist safety is always our primary objective.” ↑
SENATE COMMITTEE ON TRANSPORTATION AND HOUSING
Senator Jim Beall, Chair
2017 - 2018 Regular
Bill No: AB 1405 Hearing Date: 6/19/2018
Author: | Mullin | ||
Version: | 6/13/2018 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Randy Chinn | ||
SUBJECT: Digital sign demonstration pilot program.
DIGEST: This bill authorizes the California Department of Transportation (Caltrans) to establish a pilot project for advertising on state rights of way, subject to federal approval.
ANALYSIS:
Existing law:
- Requires all states to adopt the federal Manual on Uniform Traffic Control Devices (MUTCD), or to at least substantially comply with it. The federal MUTCD prescribes standards for signs, signals, markings, and other devices used to guide traffic on streets and highways throughout the country. California has adopted its own MUTCD, which has been approved by federal officials as being “substantially in compliance” with the federal MUTCD.
- Provides that traffic control devices or their supports shall not bear any advertising message or any other message that is not related to traffic control.
- Provides that only those traffic control devices that conform to the California MUTCD may be placed on a street or highway.
- Establishes the Outdoor Advertising Act (OAA), which regulates the placement of advertising displays adjacent to and within specified distances of highways that are part of the national system of interstate, defense highways, and federal-aid highways.
- Prohibits any advertising display from being placed or maintained on property adjacent to a section of a freeway that has been landscaped if the advertising display is designed to be viewed primarily by persons traveling on the main-traveled way of the landscaped freeway.
This bill:
- Authorizes a pilot program until 2024 for digital advertising signs within the state right of way consistent with the program described in a recent Caltrans feasibility study. Features of the program include:
- Authorizes up to 25 signs with no cost to the state.
- Caltrans has discretion to select sign locations.
- After the installation costs are recovered by the contractor, advertising revenue is split with at least 50% going to the state.
- Signs shall meet Caltrans’ design, construction and operating standards.
- Signs shall enhance public messaging, including safety campaigns, emergency notification, travel times, and traveler information.
- State emergency notifications have priority over all messaging, including advertising.
- Caltrans may establish guidelines and standards for advertising; advertising of alcohol, tobacco, firearms, sexually explicit material, political messages, or any illegal activity is not permitted.
- Caltrans retains the ability to determine the safety of the signs and to take whatever actions are necessary to protect public safety.
- State is indemnified from any claims or losses.
- State owns the signs after the pilot program ends.
- Subject to federal approval.
- Establishes minimum qualifications for an entity contracted to install and operate the signs, including demonstrated experience, required licenses, and financial capacity.
- Requires annual reporting to the Legislature regarding the project status, safety impact, and revenue received.
- Requires any advertising revenue to be deposited into the State Highway Account, subject to appropriation consistent with the provisions of any federal authorization.
COMMENTS
- Author’s Stated Purpose. The purpose of AB 1405 is to authorize an enterprise initiative between Caltrans and the private sector for a new, state-of-the-art, digital sign network to provide real-time information for enhanced statewide emergency and traveler communications – at no cost to the State.
- Driving to Distraction. Advertising is intended to attract attention, which by definition distracts from the task of driving. Allowing advertising on the highway right of way, and potentially over the highway itself, raises safety issues; advertising is currently barred in the highway right of way for a reason. Moreover, we are in a period where driving is becoming less safe, despite having vehicles which are safer than ever. The National Safety Council found that 40,100 people were killed while driving in 2017, an increase of 6% from 2015. It certainly appears that more drivers are distracted than ever. Given this context, allowing advertising for the first time ever in the highway right of way must be very carefully considered.
In addition to advertising, the digital displays envisioned in this bill can also provide information that is useful to drivers, such as expected driving times, hazard warnings and emergency alerts. They may be useful in natural disasters to communicate news and direct traffic.
- California Mad Men. The state can earn revenue by hosting advertising: A single digital billboard can bring in $500,000 annually. Were California to develop a network of digital signs along the major state highways, the state would control a new and powerful advertising media, outshining other billboards and outdoor advertising displays which are less optimally located. Supporters of this bill suggest revenue potential in the hundreds of millions of dollars annually. This creates new competition which conflicts with the interests of local governments, who receive revenue from advertising displays they permit. And for the outdoor advertising industry, a large state advertising network could only be developed and managed by a large firm, disadvantaging the smaller outdoor advertising companies. More generally, the additional outdoor advertising signs allowed by this bill will increase the supply of outdoor advertising space, thereby driving down the price for advertising in the outdoor advertising market, which is bad news for the outdoor advertising companies owning that space and the local governments who share in those revenues.
- Permission, not Forgiveness. Federal law requires all states to comply with the federal MUTCD, or to be substantially compliant with it. To utilize changeable message signs (CMS) for advertising, Caltrans must seek a waiver from the federal government. If Caltrans were to use the CMS as required in this bill without the receipt of a waiver, the Federal Highway Administration (FHWA) would be authorized by federal law to withhold 10% of the transportation funds California receives from the federal government.
Recent experience suggests that such permission is unlikely to be granted. Earlier this year the FHWA penalized New York $14 million for allowing advertising on highway signs.[1] Trade journals report that a Texas Department of Transportation request to sell corporate sponsorships on overhanging signs was also rejected. In a response to a citizen suggesting that advertising be placed on the back of overhead traffic signs, the Associate Administrator for Operations at FHWA noted that “Signs on the highways are limited to those that will promote the safe and efficient utilization of the highways. In addition, all real property within the right-of-way boundaries must be devoted exclusively to public highway purposes.”
- Neither Fish nor Fowl. Supporters envision a different type of advertising sign which they believe will fare better with the FHWA. Rather than adding advertising to a CMS the supporters would instead offer a stand-alone digital billboard which provided traffic information infrequently. That would theoretically reduce driver distraction because it would be separate from the traffic information provided on the CMS. And because the sign would rarely offer traffic information it would theoretically not be subject to the MUTCD. Such standalone signs would be permitted under this bill if Caltrans and the FHWA approved. But again, given the recent, strong, and consistent denials of advertising proposals by the FHWA, it is difficult to see such a proposal being approved.
- One Step on a Path Forward. Pursuant to law, Caltrans has recently issued a report describing a feasible pilot project on advertising on CMS which would evaluate any potential safety implications and assess how much potential revenue could be generated to support CMS infrastructure and the State highway system as a whole. Safety is a paramount consideration, with any pilot crafted to manage the risk of distraction to drivers, including inattention to other safety notices and signs, such as the AMBER alert program. Caltrans notes such a pilot would need federal approval which, given FHWA’s recent track record, is unlikely. This bill is intended to be entirely consistent with the Caltrans report.
- Going Slow. The pilot program established by this bill reflects the conservative approach taken by Caltrans emphasizing the concern for public safety and the benefits of more information to the driving public, rather than emphasizing the pursuit of advertising revenue which would come from a full-fledged state digital advertising program.
- There, Not Here. Caltrans determines the locations of the digital signs. Opponents are concerned that Caltrans could choose to place signs in cities which have imposed outdoor advertising bans or near city-owned billboards.
- Double Referral. This bill has been double-referred to the Judiciary Committee.
Related Legislation:
AB 3168 (Rubio, 2018) — Provides more specificity and flexibility for Caltrans to relocate and site outdoor advertising. This bill is pending in the Senate Appropriations Committee.
SB 1397 (Huff, 2016) — would have established a program for advertising on state rights of way similar to AB 1405. This bill died on the Senate floor.
SB 853 (Committee on Budget and Fiscal Review, Chapter 27, Statutes of 2014) — required Caltrans to report to the Legislature by January 10, 2015, on the subject of advertising on electronic CMS on the state highway system, and on the feasibility of a pilot project in that regard, including estimates of revenue.
SB 854 (Committee on Budget and Fiscal Review, 2010) — would have authorized Caltrans to lease space for advertisements on digital messaging signs on the state highway system that are currently used for traveler information. These changes in statute would have required Caltrans receive a federal waiver before entering into any contract for advertisements on digital messaging signs and would have required that any such contract be provided to the legislature for a 30-day review prior to enactment. This bill failed passage on the Senate floor.
AB 1614 (Committee on Budget, 2010) — would have authorized an experimental program that would allow advertising on upgraded CMS on highway right of way. A federal waiver, or a change in federal law, was necessary to implement this program, and this bill stated the program cannot be implemented unless approved by the federal government. This bill failed passage on the Senate floor.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
POSITIONS: (Communicated to the committee before noon on Wednesday,
June 13, 2018.)
SUPPORT:
Associated General Contractors
Building and Construction Trades Council of Alameda County
California Nevada Cement Association
Crime Survivors Resource Center
Greater Los Angeles African American Chamber of Commerce
Intelligent Sign Network
National Center for Victims of Crime
Outfront Media
Ron Goldman Foundation for Justice
San Francisco Fire Fighters Local 798
State Building and Construction Trades Council
Board of Equalization Member George Runner
OPPOSITION:
California State Association of Counties
City of Baldwin Park
City of Bellflower
City of Buena Park
City of Carson
City of Compton
City of Eastvale
City of Lynwood
City of Rohnert Park
City of Santa Fe Springs
City of South Gate
City of Thousand Oaks
Coalition to Ban Billboard Blight
General Outdoor Advertising
Lamar Advertising
League of California Cities
Meadow Outdoor Advertising
Sonoma County Board of Supervisors
Stott Outdoor Advertising
Veale Outdoor Advertising
51 individuals
-- END --
The impermissible advertising was static, not digital, and was limited to state tourism, including the iconic “I♥NY” as well as a related website address. The FHWA’s penalty letter noted that “Motorist safety is always our primary objective.” ↑
SENATE COMMITTEE ON TRANSPORTATION AND HOUSING
Senator Jim Beall, Chair
2017 - 2018 Regular
Bill No: AB 1405 Hearing Date: 6/19/2018
Author: | Mullin | ||
Version: | 6/13/2018 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Randy Chinn | ||
SUBJECT: Digital sign demonstration pilot program.
DIGEST: This bill authorizes the California Department of Transportation (Caltrans) to establish a pilot project for advertising on state rights of way, subject to federal approval.
ANALYSIS:
Existing law:
- Requires all states to adopt the federal Manual on Uniform Traffic Control Devices (MUTCD), or to at least substantially comply with it. The federal MUTCD prescribes standards for signs, signals, markings, and other devices used to guide traffic on streets and highways throughout the country. California has adopted its own MUTCD, which has been approved by federal officials as being “substantially in compliance” with the federal MUTCD.
- Provides that traffic control devices or their supports shall not bear any advertising message or any other message that is not related to traffic control.
- Provides that only those traffic control devices that conform to the California MUTCD may be placed on a street or highway.
- Establishes the Outdoor Advertising Act (OAA), which regulates the placement of advertising displays adjacent to and within specified distances of highways that are part of the national system of interstate, defense highways, and federal-aid highways.
- Prohibits any advertising display from being placed or maintained on property adjacent to a section of a freeway that has been landscaped if the advertising display is designed to be viewed primarily by persons traveling on the main-traveled way of the landscaped freeway.
This bill:
- Authorizes a pilot program until 2024 for digital advertising signs within the state right of way consistent with the program described in a recent Caltrans feasibility study. Features of the program include:
- Authorizes up to 25 signs with no cost to the state.
- Caltrans has discretion to select sign locations.
- After the installation costs are recovered by the contractor, advertising revenue is split with at least 50% going to the state.
- Signs shall meet Caltrans’ design, construction and operating standards.
- Signs shall enhance public messaging, including safety campaigns, emergency notification, travel times, and traveler information.
- State emergency notifications have priority over all messaging, including advertising.
- Caltrans may establish guidelines and standards for advertising; advertising of alcohol, tobacco, firearms, sexually explicit material, political messages, or any illegal activity is not permitted.
- Caltrans retains the ability to determine the safety of the signs and to take whatever actions are necessary to protect public safety.
- State is indemnified from any claims or losses.
- State owns the signs after the pilot program ends.
- Subject to federal approval.
- Establishes minimum qualifications for an entity contracted to install and operate the signs, including demonstrated experience, required licenses, and financial capacity.
- Requires annual reporting to the Legislature regarding the project status, safety impact, and revenue received.
- Requires any advertising revenue to be deposited into the State Highway Account, subject to appropriation consistent with the provisions of any federal authorization.
COMMENTS
- Author’s Stated Purpose. The purpose of AB 1405 is to authorize an enterprise initiative between Caltrans and the private sector for a new, state-of-the-art, digital sign network to provide real-time information for enhanced statewide emergency and traveler communications – at no cost to the State.
- Driving to Distraction. Advertising is intended to attract attention, which by definition distracts from the task of driving. Allowing advertising on the highway right of way, and potentially over the highway itself, raises safety issues; advertising is currently barred in the highway right of way for a reason. Moreover, we are in a period where driving is becoming less safe, despite having vehicles which are safer than ever. The National Safety Council found that 40,100 people were killed while driving in 2017, an increase of 6% from 2015. It certainly appears that more drivers are distracted than ever. Given this context, allowing advertising for the first time ever in the highway right of way must be very carefully considered.
In addition to advertising, the digital displays envisioned in this bill can also provide information that is useful to drivers, such as expected driving times, hazard warnings and emergency alerts. They may be useful in natural disasters to communicate news and direct traffic.
- California Mad Men. The state can earn revenue by hosting advertising: A single digital billboard can bring in $500,000 annually. Were California to develop a network of digital signs along the major state highways, the state would control a new and powerful advertising media, outshining other billboards and outdoor advertising displays which are less optimally located. Supporters of this bill suggest revenue potential in the hundreds of millions of dollars annually. This creates new competition which conflicts with the interests of local governments, who receive revenue from advertising displays they permit. And for the outdoor advertising industry, a large state advertising network could only be developed and managed by a large firm, disadvantaging the smaller outdoor advertising companies. More generally, the additional outdoor advertising signs allowed by this bill will increase the supply of outdoor advertising space, thereby driving down the price for advertising in the outdoor advertising market, which is bad news for the outdoor advertising companies owning that space and the local governments who share in those revenues.
- Permission, not Forgiveness. Federal law requires all states to comply with the federal MUTCD, or to be substantially compliant with it. To utilize changeable message signs (CMS) for advertising, Caltrans must seek a waiver from the federal government. If Caltrans were to use the CMS as required in this bill without the receipt of a waiver, the Federal Highway Administration (FHWA) would be authorized by federal law to withhold 10% of the transportation funds California receives from the federal government.
Recent experience suggests that such permission is unlikely to be granted. Earlier this year the FHWA penalized New York $14 million for allowing advertising on highway signs.[1] Trade journals report that a Texas Department of Transportation request to sell corporate sponsorships on overhanging signs was also rejected. In a response to a citizen suggesting that advertising be placed on the back of overhead traffic signs, the Associate Administrator for Operations at FHWA noted that “Signs on the highways are limited to those that will promote the safe and efficient utilization of the highways. In addition, all real property within the right-of-way boundaries must be devoted exclusively to public highway purposes.”
- Neither Fish nor Fowl. Supporters envision a different type of advertising sign which they believe will fare better with the FHWA. Rather than adding advertising to a CMS the supporters would instead offer a stand-alone digital billboard which provided traffic information infrequently. That would theoretically reduce driver distraction because it would be separate from the traffic information provided on the CMS. And because the sign would rarely offer traffic information it would theoretically not be subject to the MUTCD. Such standalone signs would be permitted under this bill if Caltrans and the FHWA approved. But again, given the recent, strong, and consistent denials of advertising proposals by the FHWA, it is difficult to see such a proposal being approved.
- One Step on a Path Forward. Pursuant to law, Caltrans has recently issued a report describing a feasible pilot project on advertising on CMS which would evaluate any potential safety implications and assess how much potential revenue could be generated to support CMS infrastructure and the State highway system as a whole. Safety is a paramount consideration, with any pilot crafted to manage the risk of distraction to drivers, including inattention to other safety notices and signs, such as the AMBER alert program. Caltrans notes such a pilot would need federal approval which, given FHWA’s recent track record, is unlikely. This bill is intended to be entirely consistent with the Caltrans report.
- Going Slow. The pilot program established by this bill reflects the conservative approach taken by Caltrans emphasizing the concern for public safety and the benefits of more information to the driving public, rather than emphasizing the pursuit of advertising revenue which would come from a full-fledged state digital advertising program.
- There, Not Here. Caltrans determines the locations of the digital signs. Opponents are concerned that Caltrans could choose to place signs in cities which have imposed outdoor advertising bans or near city-owned billboards.
- Double Referral. This bill has been double-referred to the Judiciary Committee.
Related Legislation:
AB 3168 (Rubio, 2018) — Provides more specificity and flexibility for Caltrans to relocate and site outdoor advertising. This bill is pending in the Senate Appropriations Committee.
SB 1397 (Huff, 2016) — would have established a program for advertising on state rights of way similar to AB 1405. This bill died on the Senate floor.
SB 853 (Committee on Budget and Fiscal Review, Chapter 27, Statutes of 2014) — required Caltrans to report to the Legislature by January 10, 2015, on the subject of advertising on electronic CMS on the state highway system, and on the feasibility of a pilot project in that regard, including estimates of revenue.
SB 854 (Committee on Budget and Fiscal Review, 2010) — would have authorized Caltrans to lease space for advertisements on digital messaging signs on the state highway system that are currently used for traveler information. These changes in statute would have required Caltrans receive a federal waiver before entering into any contract for advertisements on digital messaging signs and would have required that any such contract be provided to the legislature for a 30-day review prior to enactment. This bill failed passage on the Senate floor.
AB 1614 (Committee on Budget, 2010) — would have authorized an experimental program that would allow advertising on upgraded CMS on highway right of way. A federal waiver, or a change in federal law, was necessary to implement this program, and this bill stated the program cannot be implemented unless approved by the federal government. This bill failed passage on the Senate floor.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
POSITIONS: (Communicated to the committee before noon on Wednesday,
June 13, 2018.)
SUPPORT:
Associated General Contractors
Building and Construction Trades Council of Alameda County
California Nevada Cement Association
Crime Survivors Resource Center
Greater Los Angeles African American Chamber of Commerce
Intelligent Sign Network
National Center for Victims of Crime
Outfront Media
Ron Goldman Foundation for Justice
San Francisco Fire Fighters Local 798
State Building and Construction Trades Council
Board of Equalization Member George Runner
OPPOSITION:
California State Association of Counties
City of Baldwin Park
City of Bellflower
City of Carson
City of Eastvale
City of Lynwood
City of Rohnert Park
City of Thousand Oaks
General Outdoor Advertising
Lamar Advertising
League of California Cities
Meadow Outdoor Advertising
Stott Outdoor Advertising
Veale Outdoor Advertising
-- END --
The impermissible advertising was static, not digital, and was limited to state tourism, including the iconic “I♥NY” as well as a related website address. The FHWA’s penalty letter noted that “Motorist safety is always our primary objective.” ↑
SENATE COMMITTEE ON TRANSPORTATION AND HOUSING
Senator Jim Beall, Chair
2017 - 2018 Regular
Bill No: Hearing Date: 6/19/2018
Author: | Mullin | ||
Version: | 6/13/2018 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Randy Chinn | ||
SUBJECT: Digital sign demonstration pilot program.
DIGEST: This bill authorizes the California Department of Transportation (Caltrans) to establish a pilot project for advertising on state rights of way, subject to federal approval.
ANALYSIS:
Existing law:
- Requires all states to adopt the federal Manual on Uniform Traffic Control Devices (MUTCD), or to at least substantially comply with it. The federal MUTCD prescribes standards for signs, signals, markings, and other devices used to guide traffic on streets and highways throughout the country. California has adopted its own MUTCD, which has been approved by federal officials as being “substantially in compliance” with the federal MUTCD.
- Provides that traffic control devices or their supports shall not bear any advertising message or any other message that is not related to traffic control.
- Provides that only those traffic control devices that conform to the California MUTCD may be placed on a street or highway.
- Establishes the Outdoor Advertising Act (OAA), which regulates the placement of advertising displays adjacent to and within specified distances of highways that are part of the national system of interstate, defense highways, and federal-aid highways.
- Prohibits any advertising display from being placed or maintained on property adjacent to a section of a freeway that has been landscaped if the advertising display is designed to be viewed primarily by persons traveling on the main-traveled way of the landscaped freeway.
This bill:
- Authorizes a pilot program until 2024 for digital advertising signs within the state right of way consistent with the program described in a recent Caltrans feasibility study. Features of the program include:
- Authorizes up to 25 signs with no cost to the state.
- Caltrans has discretion to select sign locations.
- After the installation costs are recovered by the contractor, advertising revenue is split with at least 50% going to the state.
- Signs shall meet Caltrans’ design, construction and operating standards.
- Signs shall enhance public messaging, including safety campaigns, emergency notification, travel times, and traveler information.
- State emergency notifications have priority over all messaging, including advertising.
- Caltrans may establish guidelines and standards for advertising; advertising of alcohol, tobacco, firearms, sexually explicit material, political messages, or any illegal activity is not permitted.
- Caltrans retains the ability to determine the safety of the signs and to take whatever actions are necessary to protect public safety.
- State is indemnified from any claims or losses.
- State owns the signs after the pilot program ends.
- Subject to federal approval.
- Establishes minimum qualifications for an entity contracted to install and operate the signs, including demonstrated experience, required licenses, and financial capacity.
- Requires annual reporting to the Legislature regarding the project status, safety impact, and revenue received.
- Requires any advertising revenue to be deposited into the State Highway Account, subject to appropriation consistent with the provisions of any federal authorization.
COMMENTS
- Author’s Stated Purpose. The purpose of AB 1405 is to authorize an enterprise initiative between Caltrans and the private sector for a new, state-of-the-art, digital sign network to provide real-time information for enhanced statewide emergency and traveler communications – at no cost to the State.
- Driving to Distraction. Advertising is intended to attract attention, which by definition distracts from the task of driving. Allowing advertising on the highway right of way, and potentially over the highway itself, raises safety issues; advertising is currently barred in the highway right of way for a reason. Moreover, we are in a period where driving is becoming less safe, despite having vehicles which are safer than ever. The National Safety Council found that 40,100 people were killed while driving in 2017, an increase of 6% from 2015. It certainly appears that more drivers are distracted than ever. Given this context, allowing advertising for the first time ever in the highway right of way must be very carefully considered.
In addition to advertising, the digital displays envisioned in this bill can also provide information that is useful to drivers, such as expected driving times, hazard warnings and emergency alerts. They may be useful in natural disasters to communicate news and direct traffic.
- California Mad Men. The state can earn revenue by hosting advertising: A single digital billboard can bring in $500,000 annually. Were California to develop a network of digital signs along the major state highways, the state would control a new and powerful advertising media, outshining other billboards and outdoor advertising displays which are less optimally located. Supporters of this bill suggest revenue potential in the hundreds of millions of dollars annually. This creates new competition which conflicts with the interests of local governments, who receive revenue from advertising displays they permit. And for the outdoor advertising industry, a large state advertising network could only be developed and managed by a large firm, disadvantaging the smaller outdoor advertising companies. More generally, the additional outdoor advertising signs allowed by this bill will increase the supply of outdoor advertising space, thereby driving down the price for advertising in the outdoor advertising market, which is bad news for the outdoor advertising companies owning that space and the local governments who share in those revenues.
- Permission, not Forgiveness. Federal law requires all states to comply with the federal MUTCD, or to be substantially compliant with it. To utilize changeable message signs (CMS) for advertising, Caltrans must seek a waiver from the federal government. If Caltrans were to use the CMS as required in this bill without the receipt of a waiver, the Federal Highway Administration (FHWA) would be authorized by federal law to withhold 10% of the transportation funds California receives from the federal government.
Recent experience suggests that such permission is unlikely to be granted. Earlier this year the FHWA penalized New York $14 million for allowing advertising on highway signs.[1] Trade journals report that a Texas Department of Transportation request to sell corporate sponsorships on overhanging signs was also rejected. In a response to a citizen suggesting that advertising be placed on the back of overhead traffic signs, the Associate Administrator for Operations at FHWA noted that “Signs on the highways are limited to those that will promote the safe and efficient utilization of the highways. In addition, all real property within the right-of-way boundaries must be devoted exclusively to public highway purposes.”
- Neither Fish nor Fowl. Supporters envision a different type of advertising sign which they believe will fare better with the FHWA. Rather than adding advertising to a CMS the supporters would instead offer a stand-alone digital billboard which provided traffic information infrequently. That would theoretically reduce driver distraction because it would be separate from the traffic information provided on the CMS. And because the sign would rarely offer traffic information it would theoretically not be subject to the MUTCD. Such standalone signs would be permitted under this bill if Caltrans and the FHWA approved. But again, given the recent, strong, and consistent denials of advertising proposals by the FHWA, it is difficult to see such a proposal being approved.
- One Step on a Path Forward. Pursuant to law, Caltrans has recently issued a report describing a feasible pilot project on advertising on CMS which would evaluate any potential safety implications and assess how much potential revenue could be generated to support CMS infrastructure and the State highway system as a whole. Safety is a paramount consideration, with any pilot crafted to manage the risk of distraction to drivers, including inattention to other safety notices and signs, such as the AMBER alert program. Caltrans notes such a pilot would need federal approval which, given FHWA’s recent track record, is unlikely. This bill is intended to be entirely consistent with the Caltrans report.
- Going Slow. The pilot program established by this bill reflects the conservative approach taken by Caltrans emphasizing the concern for public safety and the benefits of more information to the driving public, rather than emphasizing the pursuit of advertising revenue which would come from a full-fledged state digital advertising program.
- There, Not Here. Caltrans determines the locations of the digital signs. Opponents are concerned that Caltrans could choose to place signs in cities which have imposed outdoor advertising bans or near city-owned billboards.
- Double Referral. This bill has been double-referred to the Judiciary Committee.
Related Legislation:
AB 3168 (Rubio, 2018) — Provides more specificity and flexibility for Caltrans to relocate and site outdoor advertising. This bill is pending in the Senate Appropriations Committee.
SB 1397 (Huff, 2016) — would have established a program for advertising on state rights of way similar to AB 1405. This bill died on the Senate floor.
SB 853 (Committee on Budget and Fiscal Review, Chapter 27, Statutes of 2014) — required Caltrans to report to the Legislature by January 10, 2015, on the subject of advertising on electronic CMS on the state highway system, and on the feasibility of a pilot project in that regard, including estimates of revenue.
SB 854 (Committee on Budget and Fiscal Review, 2010) — would have authorized Caltrans to lease space for advertisements on digital messaging signs on the state highway system that are currently used for traveler information. These changes in statute would have required Caltrans receive a federal waiver before entering into any contract for advertisements on digital messaging signs and would have required that any such contract be provided to the legislature for a 30-day review prior to enactment. This bill failed passage on the Senate floor.
AB 1614 (Committee on Budget, 2010) — would have authorized an experimental program that would allow advertising on upgraded CMS on highway right of way. A federal waiver, or a change in federal law, was necessary to implement this program, and this bill stated the program cannot be implemented unless approved by the federal government. This bill failed passage on the Senate floor.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
POSITIONS: (Communicated to the committee before noon on Wednesday,
June 13, 2018.)
SUPPORT:
Associated General Contractors
Building and Construction Trades Council of Alameda County
California Nevada Cement Association
Crime Survivors Resource Center
Greater Los Angeles African American Chamber of Commerce
Intelligent Sign Network
National Center for Victims of Crime
Outfront Media
Ron Goldman Foundation for Justice
San Francisco Fire Fighters Local 798
State Building and Construction Trades Council
Board of Equalization Member George Runner
OPPOSITION:
California State Association of Counties
City of Baldwin Park
City of Carson
City of Eastvale
City of Lynwood
City of Rohnert Park
General Outdoor Advertising
Lamar Advertising
League of California Cities
Meadow Outdoor Advertising
Stott Outdoor Advertising
Veale Outdoor Advertising
-- END --
The impermissible advertising was static, not digital, and was limited to state tourism, including the iconic “I♥NY” as well as a related website address. The FHWA’s penalty letter noted that “Motorist safety is always our primary objective.” ↑
SENATE COMMITTEE ON
Senator Ricardo Lara, Chair
2017 - 2018 Regular Session
AB 1405 (Mullin) - Integrated resource plan: peak demand
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
- AB 1405 requires the California Public Utilities Commission (CPUC) to consider the role of clean energy technology, demand response, and energy efficiency in helping to ensure each load-serving entity (LSE) meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the state’s energy goals at the least cost to ratepayers.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on September 1, 2017
Fiscal Impact:
- Approximately $125,000 (Utilities Reimbursement Account) to the CPUC for one staff position to develop, vet and implement criteria for evaluating whether LSEs meet net-load.
- Approximately $125,000 (Energy Resources Program Account or General Fund) to the California Energy Commission for one staff position to revise integrated resource plan guidelines, update energy forecast scenarios, and provide ongoing analysis and reporting on whether publicly owned utilities reduce their clean peak.
Author Amendments:
- Change the definition of ‘peak energy’.
- Make technical changes to better align the bill with SB 338 (Skinner, 2017).
-- END --
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB |
THIRD READING
Bill No: AB 1405
Amended: 9/1/17 in Senate
SENATE ENERGY, U. & C. COMMITTEE: 8-2, 7/10/17
AYES: Hueso, Bradford, Hertzberg, Hill, McGuire, Skinner, Stern, Wiener
NOES: Morrell, Vidak
NO VOTE RECORDED: Cannella
SENATE APPROPRIATIONS COMMITTEE: 5-2, 9/1/17
AYES: Lara, Beall, Bradford, Hill, Wiener
NOES: Bates, Nielsen
ASSEMBLY FLOOR: 43-31, 6/1/17 - See last page for vote
DIGEST:
This bill requires the California Public Utilities Commission (CPUC) and the governing board of each local Publicly Owned Utility (POU) to each consider the role of a variety of energy technologies and resources in meeting energy and reliability needs during and around the hour of peak demand while reducing the need for new generation and transmission resources.
Existing law:
- Directs the California Energy Commission (CEC) and the CPUC, where feasible, to authorize procurement of resources to provide grid reliability services that minimize reliance on system power and fossil fuel resources and, where feasible, cost effective, and consistent with other state policy objectives, increase the use of large- and small-scale energy storage. (Public Utilities Code §400)
- Requires the CPUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. The portfolio shall rely upon zero carbon-emitting resources to the maximum extent reasonable and be designed to achieve any statewide GHG emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with §38500) of the Health and Safety Code) or any successor legislation. (Public Utilities Code §454.51(a))
- Requires the CPUC to adopt a process for each load-serving entity (meaning each electrical corporation (often referred to as an “investor-owned utility” or “IOU”), each electric service provider (ESP) and each community choice aggregator (CCA)) to file an integrated resource plan (IRP) to ensure each meets (a) GHG emissions reduction targets for the electricity sector, (b) the RPS, and (c) other goals and obligations. Requires each LSE to submit an IRP to the CPUC for review. (Public Resources Code §454.52)
- Requires the governing board of a local POU to adopt an IRP and a process for updating the plan at least once every five years to ensure the utility meets (a) the GHG emissions reduction targets for the electricity sector, (b) the RPS, and (c) other goals and obligations, to be submitted to the CEC for review. Requires the CEC to provide recommendations to correct the deficiencies in the IRP. (Public Resources Code §§9621 and 9622)
This bill:
- Requires the CPUC and each governing board of a POU, in furtherance of development of their respective IRPs, to consider the role of the following energy resources in helping to ensure each electric utility meets energy needs and reliability needs in “hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority,” while reducing the need for new electricity generation and new transmission resources in achieving the state’s energy goals at the least cost to ratepayers:
- Existing renewable generation.
- Grid operational efficiencies.
- Energy storage.
- Distributed energy resources, including energy efficiency.
- Includes language to avoid conflict with AB 759 (Dahle, Chapter 140, Statutes of 2017), which affects some of the same sections of code as this bill and conditionally exempts an electrical cooperative from the need to prepare and IRP.
Background
Bill seeks to address the peak. California is at the forefront of efforts to increase the use of renewable energy and reduce the use of fossil fuels. The author notes the intermittent nature of the output of our most-relied upon renewable energy sources—wind and solar. The author also notes the lack of coincidence of the output of these energy sources and of demand for electricity. The result, at least on some days of the year, is a sudden, steep ramp in demand for energy that cannot be met by renewable energy sources.
The author asserts that as more renewables (primarily wind and solar) are built to meet the state’s existing renewable energy goals, more fossil-fueled power plants will be built to provide flexibility and reliability. The author further asserts that this construction of new fossil-fueled powerplants will result in California failing to meet both its GHG reduction goals and its cost-effectiveness goals. To avoid such an outcome, this bill proposes to require the CPUC, which regulates the energy resource procurement of the IOUs, and the governing board of a local POU, to each establish policies and procedures to the extent those policies and procedures ensure each LSE meets peak energy needs and reliability needs while reducing the need for new electricity generation and transmission resources in achieving the state’s energy goals at the least cost to ratepayers.
It is not clear that the future will unfold as the author predicts. Existing law provides ample direction to the CPUC and, to a somewhat lesser extent the governing boards of POUs, to achieve the state’s renewable energy and GHG reduction goals, and other related objectives, at least cost. For example, Public Utilities Code §454.51 (a) requires the CPUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. Further, statute requires the CPUC to adopt a process by which each “load-serving entity” (meaning IOU, ESP and CCA) file a regularly updated IRP. The IRP, subject to CPUC oversight, details how the entity will achieve the following:
- Meet GHG emissions reduction targets.
- Procure at least 50 percent eligible renewable energy resources by December 31, 2030.
- Fulfill the obligation to serve IOU customers at just and reasonable rates.
- Minimize impacts on ratepayers’ bills.
- Ensure system and local reliability.
- Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
- Enhance distribution systems and demand-side energy management.
- Minimize localized air pollutants and other GHG emissions, with early priority on disadvantaged communities.
Statute establishes a similar IRP process to be developed by CEC, applicable to the POUs.
The CPUC and CEC are developing the IRP processes now. By some point early next year, presumably, the LSEs and POUs will file IRPs with the CPUC and CEC, respectively. Statutory direction and CPUC and CEC oversight should ensure that the IRP process results in an energy portfolio that achieves the state’s renewable energy and GHG reduction goals overall, among other objectives, at the least feasible cost. Such an outcome would address the author’s concerns.
What the IRP process will not address, however, is the energy resources used to meet peak energy demand specifically or the costs of doing so. To remedy this perceived deficiency, this bill directs the CPUC and the governing board of each POU, in developing their respective IRPs, to consider the role of certain energy resources in helping to ensure each electric utility meets energy needs and reliability needs in “hours to encompass the hour of peak demand of electricity,” while reducing the need for new electricity generation and new transmission resources in achieving the state’s energy goals at the least cost to ratepayers.
Related/Prior Legislation
SB 338 (Skinner, 2017) requires utility regulators to consider establishing policies and procedures to ensure each utility meets “net-load peak” energy needs and reliability needs while reducing the need for new generation and transmission. The bill passed the Senate Committee on Energy, Utilities and Communications on an 8-3 vote and is now pending consideration before the full Assembly.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
According the Senate Committee on Appropriations:
- Approximately $125,000 (Utilities Reimbursement Account) to the CPUC for one staff position to develop, vet and implement criteria for evaluating whether LSEs meet net-load.
- Approximately $125,000 (Energy Resources Program Account or General Fund) to the CEC for one staff position to revise integrated resource plan guidelines, update energy forecast scenarios, and provide ongoing analysis and reporting on whether publicly owned utilities reduce their clean peak.
8minuteenergy
California Energy Storage Alliance
Clean Power Campaign
OutBack Power
Tesla, Inc.
Trans Bay Cable
Association of California Water Agencies
California Chamber of Commerce
California Municipal Utilities District
Independent Energy Producers Association
Pacific Gas and Electric Company
Sacramento Municipal Utility District
San Diego Gas & Electric
Southern California Edison
ARGUMENTS IN SUPPORT: According to the author:
AB 1405 provides a policy framework to reduce GHG emissions during peak electricity demand in order to facilitate the state’s ability to reach its 2030 goals of 40 percent GHG reduction below 1990 levels and 50 percent RPS while maintaining a reliable grid.
ARGUMENTS IN OPPOSITION: Opponents, including the state’s IOUs, the Sacramento Municipal Utilities District, and the Association of California Water Agencies, contend this bill is unneeded, given the requirements of existing law, and hinder utilities from meeting the state’s energy and environmental goals as the least possible cost to ratepayers.
ASSEMBLY FLOOR: 43-31, 6/1/17
AYES: Aguiar-Curry, Berman, Bloom, Bocanegra, Bonta, Burke, Calderon, Chau, Chiu, Chu, Dababneh, Eggman, Friedman, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gomez, Gonzalez Fletcher, Holden, Irwin, Jones-Sawyer, Kalra, Levine, Limón, Low, McCarty, Medina, Mullin, Muratsuchi, Nazarian, O'Donnell, Quirk, Reyes, Ridley-Thomas, Rodriguez, Santiago, Mark Stone, Thurmond, Ting, Weber, Wood, Rendon
NOES: Acosta, Travis Allen, Arambula, Baker, Bigelow, Brough, Caballero, Cervantes, Chávez, Chen, Cunningham, Dahle, Flora, Fong, Frazier, Gallagher, Gray, Harper, Kiley, Lackey, Maienschein, Mathis, Mayes, Melendez, Obernolte, Patterson, Quirk-Silva, Salas, Steinorth, Voepel, Waldron
NO VOTE RECORDED: Choi, Cooley, Cooper, Daly, Grayson, Rubio
9/2/17 15:32:00
**** END ****
SENATE COMMITTEE ON
Senator Ricardo Lara, Chair
2017 - 2018 Regular Session
AB 1405 (Mullin) - Electricity: net-load peak
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: August 21, 2017 | Consultant: Narisha Bonakdar |
This bill meets the criteria for referral to the Suspense File.
Bill Summary:
- AB 1405 requires the California Public Utilities Commission (CPUC) to consider the role of clean energy technology, demand response, and energy efficiency in helping to ensure each load-serving entity meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the state’s energy goals at the least cost to ratepayers.
Fiscal Impact:
- Approximately $125,000 (Utilities Reimbursement Account) to the CPUC for one staff position to develop, vet and implement criteria for evaluating whether LSEs meet net-load.
- Approximately $125,000 (Energy Resources Program Account or General Fund) to the California Energy Commission for one staff position to revise integrated resource plan guidelines, update energy forecast scenarios, and provide ongoing analysis and reporting on whether publicly owned utilities reduce their clean peak.
Background:
Renewable Portfolio Standard (RPS). The California RPS program requires IOUs, POUs, and energy service providers to increase purchases of renewable energy to at least 33% of retail sales by December 31, 2020. The original RPS bill, SB 1078 (Sher, Chapter 516, Statutes of 2002) set a goal of 20% by 2017. SB 107 (Simitian, Chapter 464, Statutes of 2006) accelerated the deadline for 20% to 2010.
Fossil Fuel Power Plants, Peak Demand, and Renewable Overgeneration. As renewable sources of energy have increased in California, particularly solar energy due to the RPS and household solar, there are times of the year when the state generates more energy than it needs. Energy must be generated to meet the current demand; because energy cannot yet be effectively stored at the scale needed, every electron generated must be needed or the system will crash, leading to blackouts.
To maintain reliability the ISO must continuously match the demand for electricity with supply on a second-by-second basis. Historically, the ISO directed conventional, controllable power plant units to move up or down with the instantaneous or variable demand. With the growing penetration of renewables on the grid, there are higher levels of non-controllable, variable generation resources. Because of that, the ISO must direct controllable resources to match both variable demand and variable supply.
To ensure reliability under changing grid conditions, the ISO needs resources with ramping flexibility and the ability to start and stop multiple times per day. To ensure supply and demand match at all times, controllable resources will need the flexibility to change output levels and start and stop as dictated by real-time grid conditions.
The power plants we rely on to balance the demand for electricity with what our renewable sources are generating can only be turned down so far and continue to operate. If they are turned off entirely, they cannot be turned on fast enough to meet the state’s energy needs when solar power is no longer available. In order to ensure reliable electric service solar power must be curtailed, leading to fossil fuel based power being used to meet our peak demand.
Should the technology be developed that would allow for the storage of overgenerated renewable energy, this problem would be eliminated, allowing for the state to use clean energy to meet the demand at peak times.
Proposed Law:
- Defines “net-load peak” as the daily period of three or more consecutive hours in which the latest of the hours is the hour of peak demand for electricity, excluding demand met by variable renewable generation directly connected to the grid operated by the Independent System Operator.
- Requires the CPUC to consider the role of clean energy technology, demand response, and energy efficiency in helping to ensure each load-serving entity meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the state’s energy goals at the least cost to ratepayers.
Related Legislation:
SB 388 (Skinner, 2017) requires the consideration of distributed energy resources, including energy efficiency, existing renewable generation, and grid operational efficiencies as part of the integrated resource planning process for load-serving entities and publicly owned utilities.
Staff Comments:
The Energy Resources Program Account. The Energy Resources Program Account (ERPA), which funds most of the CEC’s activities, is in a structural deficit. The CEC has some discretion to raise the tax which funds the ERPA. However, increased revenue may not be sufficient to cover costs associated with this bill or future unfunded mandates. As such, this bill may result in a General Fund expense.
State mandate. This bill constitutes a state mandate. However, no reimbursement is required because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Ben Hueso, Chair
2017 - 2018 Regular
Bill No: Hearing Date: 7/10/2017
Author: | |||
Version: | As Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill requires the CPUC and the governing board of a local POU to each establish policies and procedures to the extent those policies and procedures ensure each load-serving entity meets “net-load peak” energy needs and reliability needs while reducing the need for new electricity generation in achieving the state’s energy goals at the least cost to ratepayers.
ANALYSIS:
Existing law:
- Requires electric utilities to procure 50 percent of their retail sales of electricity from renewable energy by 2030. This is known as the Renewable Portfolio Standard (RPS). (Public Utilities Code §399.11 et seq.)
- Requires the California Air Resources Board (ARB) to ensure that statewide greenhouse gas (GHG) emissions are reduced to at least 40 percent below the 1990 statewide GHG emissions level no later than December 31, 2030. (Health and Safety Code §38566)
- Requires the CPUC to determine appropriate targets, if any, for load servicing entities (LSEs) to procure energy storage systems. Requires LSEs to meet any targets adopted by the California Public Utilities Commission (CPUC) by 2015 and 2020. Requires local public owned utilities (POUs) to set their own targets for the procurement of energy storage and then meet those targets by 2016 and 2021. (Public Utilities Code §2835 et seq.)
- Directs the California Energy Commission (CEC) and the CPUC, where feasible, to authorize procurement of resources to provide grid reliability services that minimize reliance on system power and fossil fuel resources and, where feasible, cost effective, and consistent with other state policy objectives, increase the use of large- and small-scale energy storage. (Public Utilities Code §400)
- Requires the CPUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. The portfolio shall rely upon zero carbon-emitting resources to the maximum extent reasonable and be designed to achieve any statewide GHG emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with §38500) of the Health and Safety Code) or any successor legislation. (Public Utilities Code §454.51(a))
- Requires the CPUC to adopt a process for each load-serving entity (meaning each electrical corporation (often referred to as an “investor-owned utility” or “IOU”), each electric service provider (ESP) and each community choice aggregator (CCA)) to file an integrated resource plan (IRP) to ensure each meets (a) GHG emissions reduction targets for the electricity sector, (b) the RPS, and (c) other goals and obligations. Requires each LSE to submit an IRP to the CPUC for review. (Public Resources Code §454.52)
- Requires the governing board of a local POU to adopt an IRP and a process for updating the plan at least once every five years to ensure the utility meets (a) the GHG emissions reduction targets for the electricity sector, (b) the RPS, and (c) other goals and obligations, to be submitted to the CEC for review. Requires the CEC to provide recommendations to correct the deficiencies in the IRP. (Public Resources Code §§9621 and 9622)
This bill:
- Defines “net-load peak” as “the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by variable renewable generation directly connected to the grid operated by the California Independent System Operator (CAISO).”
- Requires the CPUC and the governing board of a local POU to each establish policies and procedures, including new targets or requirements for clean energy technology, demand response, and energy efficiency, to the extent those policies and procedures ensure each LSE meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation in achieving the state’s energy goals at the least cost to ratepayers.
Background
Bill Seeks to Address the Peak. California is at the forefront of efforts to increase the use of renewable energy and reduce the use of fossil fuels. The author notes the intermittent nature of the output of our most-relied upon renewable energy sources—wind and solar. The author also notes the lack of coincidence of the output of these energy sources and of demand for electricity. The result, at least on some days of the year, is a sudden, steep ramp in demand for energy that cannot be met by renewable energy sources.
The author asserts that as more renewables (primarily wind and solar) are built to meet the state’s existing renewable energy goals, more fossil-fueled power plants will be built to provide flexibility and reliability. The author further asserts that this construction of new fossil-fueled powerplants will result in California failing to meet both its GHG reduction goals and its cost-effective goals. To avoid such an outcome, this bill proposes to require the CPUC, which regulates the energy resource procurement of the IOUs, and the governing board of a local POU, to each establish policies and procedures to the extent those policies and procedures ensure each LSE meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation in achieving the state’s energy goals at the least cost to ratepayers. This bill calls out specific policies and procedures—new targets or requirements for clean energy technology, demand response, and energy efficiency—that the CPUC or a governing board is to establish. This bill leaves it to the CPUC and a governing board to determine what qualifies as “clean energy.”
It is not clear that the future will unfold as the author predicts. Existing law provides ample direction to the CPUC and, to a somewhat lesser extent the governing boards of POUs, to achieve the state’s renewable energy and GHG reduction goals, and other related objectives, at least cost. For example, Public Utilities Code §454.51 (a) requires the CPUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. Further, statute requires the CPUC to adopt a process by which each “load-serving entity” (meaning IOU, ESP and CCA) file a regularly updated IRP. The IRP, subject to CPUC oversight, details how the entity will achieve the following:
- Meet GHG emissions reduction targets.
- Procure at least 50 percent eligible renewable energy resources by December 31, 2030.
- Fulfill the obligation to serve IOU customers at just and reasonable rates.
- Minimize impacts on ratepayers’ bills.
- Ensure system and local reliability.
- Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
- Enhance distribution systems and demand-side energy management.
- Minimize localized air pollutants and other GHG emissions, with early priority on disadvantaged communities.
Statute establishes a similar IRP process to be developed by CEC, applicable to the POUs.
The CPUC and CEC are developing the IRP processes now. By some point early next year, presumably, the LSEs and POUs will file IRPs with the CPUC and CEC, respectively. Statutory direction and CPUC and CEC oversight should ensure that the IRP process results in an energy portfolio that achieves the state’s renewable energy and GHG reduction goals, among other objectives, at the least feasible cost. Such an outcome would address the author’s concerns.
What the IRP process will not address, however, is the generation sources used to meet peak energy demand specifically or the costs of doing so. To the extent this committee shares the author’s concerns about the characteristics of the energy resources used to meet daily peak energy demand—and presumably it does; this committee recently approved SB 338 (Skinner, 2017), which is very similar to this bill—it may wish to support this bill. However, this bill differs from SB 338, as approved by this committee in two key ways.
First, this committee amended SB 338 to require the CPUC and a governing board of locally POU to “consider the role of clean energy technology, demand response, and energy efficiency” in meeting the state’s energy goals “while reducing the need for new electricity generation resources and new transmission resources in achieving the state’s energy goals at the least cost to ratepayers.” This bill, in contrast, is prescriptive. It requires the CPUC and governing board to each “establish policies and procedures, including new targets or requirements for clean energy technology, demand response, and energy efficiency.” However, this prescription runs counter to the rationale behind the developing IRP process, which gives provides broad discretion to the CPUC (and the CEC, in the case of POUs) in developing a portfolio of energy resources in order to meet the state’s energy and environmental goals at least possible cost. Consistent with this rationale, it would be better to mirror the language in SB 338, as modified by this committee.
In addition, SB 338, as approved by this committee, also directed the CPUC and governing board each to consider the effect of clean energy technology, demand response and energy efficiency in reducing the need for new transmission.
Therefore, the committee should consider amending this bill, as follows:
In furtherance of the requirements of paragraph (1), the commission shall establish policies and procedures, including new targets or requirements for consider the role of clean energy technology, demand response, and energy efficiency, to the extent those policies and procedures in helping to ensure each load-serving entity meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the state’s energy goals at the least cost to ratepayers….
In furtherance of the requirements of subdivision (c), the governing board of a local publicly owned electric utility shall establish policies and procedures, including new targets or requirements for consider the role of clean energy technology, demand response, and energy efficiency, to the extent those policies and procedures in helping to ensure each load-serving entity meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the state’s energy goals at the least cost to ratepayers.
Definition of “Net-load Peak”: Internally Inconsistent. As described above, this bill defines “net-load peak” as “the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by variable renewable generation directly connected to the grid operated by the CAISO.” This definition matches the definition of “net-load peak” used in SB 338 as modified by this committee and was provided by the CAISO. Nonetheless, the definition is internally inconsistent, in that net-load peak is the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity. Despite this inconsistency, neither CAISO nor the author provided an alternative definition. To resolve this inconsistence, the author and committee may wish to strike reference to the second “three.”
Prior/Related Legislation
SB 338 (Skinner, 2017) requires utility regulators to consider establishing policies and procedures to ensure each utility meets “net-load peak” energy needs and reliability needs while reducing the need for new generation and transmission. The bill passed this committee on an 8-3 vote and is now pending consideration in the Assembly Committee on Utilities and Energy.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
8minuteenergy, if amended
California Energy Storage Alliance
Clean Power Campaign
OutBack Power
Tesla, Inc.
Trans Bay Cable
OPPOSITION:
Association of California Water Agencies
California Chamber of Commerce
California Municipal Utilities District
Independent Energy Producers Association
Pacific Gas and Electric Company
Sacramento Municipal Utility District
San Diego Gas & Electric
Southern California Edison
ARGUMENTS IN SUPPORT: According to the author:
AB 1405 provides a policy framework to reduce GHG emissions during peak electricity demand in order to facilitate the state’s ability to reach its 2030 goals of 40 percent GHG reduction below 1990 levels and 50 percent RPS while maintaining a reliable grid.
ARGUMENTS IN OPPOSITION: Opponents, including the state’s IOUs, the Sacramento Municipal Utilities District, and the Association of California Water Agencies, contend this bill is unneeded, given the requirements of existing law, and hinder utilities from meeting the state’s energy and environmental goals as the least possible cost to ratepayers.
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 1405
Author:(Mullin)
As Amended Ver:May 2, 2017
Majority vote
Committee | Votes | Ayes | Noes |
Utilities | 10-4 | Holden, Burke, Eggman, Cristina Garcia, Eduardo Garcia, Muratsuchi, Quirk, Reyes, Santiago, Ting | Patterson, Chen, Dahle, Fong |
Appropriations | 11-6 | Gonzalez Fletcher, Bloom, Bocanegra, Bonta, Calderon, McCarty, Quirk, Friedman, Eduardo Garcia, Muratsuchi, Reyes | Bigelow, Brough, Fong, Gallagher, Gray, Obernolte |
SUMMARY: This bill requires the California Public Utilities Commission (CPUC) and the governing boards of the publicly-owned utilities (POUs) to establish policies and procedures to ensure each load serving entity (LSE) or POU, as applicable, meets net-load peak energy and reliability needs while reducing the need for new electricity generation and transmission in achieving the state's energy goals at the least cost to ratepayers. Specifically, this bill:
- Requires the CPUC to establish policies and procedures, including new targets or requirements for clean energy technology, demand response, and energy efficiency, to the extent those policies and procedures ensure each LSE (investor-owned electric utilities, community choice aggregators, energy service providers) meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation in achieving the state's energy goals at the least cost to ratepayers as part of the integrated resource planning process.
- Requires all POU governing boards to establish policies and procedures, including new targets or requirements for clean energy technology, demand response, and energy efficiency, to the extent that those policies and procedures ensure each utility meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation in achieving the state's energy goals at the least cost to ratepayers as part of the integrated resource planning process.
- Defines net-load peak as the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by variable renewable generation directly connected to the grid operated by the Independent System Operator (ISO).
FISCAL EFFECT: According to the Assembly Appropriations Committee, increased ongoing annual CPUC costs of approximately $384,000 (Public Utilities Reimbursement Fund) to develop LSE targets for net-peak load and implement a monitoring regime. Unknown, non-reimbursable local electric utility costs.
COMMENTS:
Meeting the Challenges of Peak Demand – The ISO, which operates 80% of the state's electric grid, performed an analysis to determine when surplus and limited supplies might occur. It showed that throughout the year, on both weekdays and weekends, supply is expected to be constrained during the peak hours from 4 p.m. to 9 p.m. when the sun is setting and solar output is declining. During the months of July and August, the supplies are even more limited during peak hours, and higher demand begins as early as noon. More interesting, however, is the amount of time that supply is expected to be plentiful or in surplus. With the exception of July and August, on the weekends, supply surplus is expected to occur during "super off-peak" hours from 10 a.m. to 4 p.m. when solar generation is at its highest. Similarly, surplus conditions are expected during this same time period on March and April weekdays, when weather is mild and air conditioning use is at a minimum. Additionally, supply is projected to be generally plentiful starting at 9 p.m. through the next morning or afternoon, depending on the month.
There are several strategies available to address what is now commonly referred to as the "Duck Curve" and specifically the neck of the duck when intermittent renewable resources fall in production and demand increases. These include time-of-use rates (in development by the IOUs) using lower prices and incentives to drive consumers to shift electric consumption to off-peak peak periods, energy storage, demand response, energy efficiency (particularly targeted for time and location), and large hydroelectric generation which, although not RPS eligible, is a Ghreen House Gas (GHG)-free resource and can at times be plentiful such as this year.
Integrated Resource Planning. Among the policies of SB 350 (De León), Chapter 547, Statutes of 2015 was the requirement that all LSEs and POUs file integrated resource plans. This "umbrella" process combines all of the state's electric procurement mandates, policies, and programs into one planning process to achieve goals and ensure California has a safe, reliable, and cost-effective electricity supply.
The plans are intended to show how the LSEs and POUs will achieve GHG reduction targets and RPS mandates. And the plans must also at the same time: fulfill the obligation of just and reasonable rates, minimize ratepayer impact, ensure system and local reliability; strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities; enhance distribution systems and demand-side energy management; and minimize localized air pollutants and other GHG emission, with early priority on disadvantaged communities.
This bill requires that integrated resource plans for all load serving entities and POUs also address issues associated with the duck curve by including new targets or requirements for clean energy technologies, demand response and energy efficiency.
Arguments in support. The author argues that "California's goals of 50% RPS by 2030, 40% GHG reduction below 1990 levels by 2030, and providing reliable, cost-effective electricity to energy customers are laudable but ultimately incongruous in the absence of a policy framework and new market mechanisms to allow the SO to manage the impacts of increasing renewables penetration. To balance these goals, clean resources must provide two functions that they have not traditionally been able to, but now can provide: deployment during peak demand and essential reliability services. CAISO, the PUC and the electric utilities need new rules and market mechanisms to facilitate these services in order to ensure a clean, reliable grid."
Analysis Prepared by: Kellie Smith / U. & E. / (916) 319-2083 FN: 0000762
Date of Hearing: May 17, 2017
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez Fletcher, Chair
ABPCA Bill Id:AB 1405
Author:(Mullin) – As Amended Ver:May 2, 2017
Policy Committee: | Utilities and Energy | Vote: | 10 - 4 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill requires the California Public Utilities Commission (PUC) and the governing boards of the publicly-owned utilities (POUs) to establish policies and procedures to ensure each load serving entity (LSE) or local publicly owned electric utility, as applicable, meets net-load peak energy and reliability needs while reducing the need for new electricity generation and transmission in achieving the state's energy goals at the least cost to ratepayers.
FISCAL EFFECT:
- Increased ongoing annual PUC costs of approximately $384,000 (Public Utilities Reimbursement Fund) to develop LSE targets for net-peak load and implement a monitoring regime.
- Unknown, non-reimbursable local electric utility costs.
COMMENTS:
- Background. Among the policies of SB 350 (de Leon), Chapter 547, Statutes of 2015, was the requirement that all LSEs and POUs file integrated resource plans. The plans are intended to show how the LSEs and POUs will achieve greenhouse gas (GHG) reduction targets and renewable portfolio strategy (RPS) mandates. The plans are also required to:
- fulfill the obligation of just and reasonable rates;
- minimize ratepayer impact;
- ensure system and local reliability;
- strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems and local communities;
- enhance distribution systems and demand-side energy management; and
- minimize localized air pollutants and other GHG emission, with early priority on disadvantaged communities.
This process combines all of the state’s electric procurement mandates, policies, and programs into one umbrella plan to achieve goals and ensure California has a safe, reliable, and cost-effective electricity supply.
The Independent System Operator (CAISO), which operates 80 percent of the state’s electric grid, performed an analysis to determine when surplus and limited supplies might occur.
The analysis showed that throughout the year, on both weekdays and weekends, supply is expected to be constrained during the peak hours from 4 p.m. to 9 p.m. when the sun is setting and solar output is declining. During the months of July and August, the supplies are even more limited during peak hours, and higher demand begins as early as noon. More interesting, however, is the amount of time that supply is expected to be plentiful or in surplus. With the exception of July and August, on the weekends, supply surplus is expected to occur during “super off-peak” hours from 10 a.m. to 4 p.m. when solar generation is at its highest. Similarly, surplus conditions are expected during this same time period on March and April weekdays, when weather is mild and air conditioning use is at a minimum. Additionally, supply is projected to be generally plentiful starting at 9 p.m. through the next morning or afternoon, depending on the month.
There are several strategies available to address what is now commonly referred to as the “Duck Curve” and specifically the neck of the duck when intermittent renewable resources fall in production and demand increases. These include time-of-use rates (in development by the IOUs) using lower prices and incentives to drive consumers to shift electric consumption to off-peak periods, energy storage, demand response, energy efficiency (particularly targeted for time and location), and large hydroelectric generation which, although not RPS eligible, is a GHG resource and can at times be plentiful such as this year.
- Purpose. According to the author, "California’s goals of 50% RPS by 2030, 40% GHG reduction below 1990 levels by 2030, and providing reliable, cost-effective electricity to energy customers are laudable but ultimately incongruous in the absence of a policy framework and new market mechanisms to allow CAISO to manage the impacts of increasing renewables penetration. To balance these goals, clean resources must provide two functions that they have not traditionally been able to, but now can provide: deployment during peak demand and essential reliability services. CAISO, the PUC and the electric utilities need new rules and market mechanisms to facilitate these services in order to ensure a clean, reliable grid."
- Related Legislation. SB 338 (Skinner) requires the PUC and California Energy Commission (CEC), in consultation with the CAISO, to establish policies or procedures to minimize the use of fossil fuels used to meet net-load peak demand. This bill is pending in the Senate Appropriations Committee.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: April 26, 2017
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Chris Holden, Chair
ABPCA Bill Id:AB 1405 (
Author:Mullin) – As Amended Ver:March 20, 2017
SUBJECT: Electricity: Clean Peak Energy Standard
SUMMARY: Requires the California Public Utilities Commission (CPUC) to ensure that each load serving entity (LSE) procures a minimum percentage of kilowatt-hours (kWh) delivered during the peakload time period from clean peak resources on at least 15 days every month according to a specific schedule and requires each local publicly owned electric utility (POU) to do the same. Specifically, this bill:
- Requires the CPUC to determine the actual percentage of kWh delivered by each LSE during the peakload time period to end-use customers in the state that is derived from clean peak resources and ensure that those entities, in addition to the percentage determined by the CPUC, procure a minimum percentage of kWh delivered during the peakload time period from clean peak resources on at least 15 days every month in accordance with the following schedule:
- An additional 5 percent of electricity delivered during the peakload time period on the required number of days each month by December 31, 2020.
- An additional 6 percent of electricity delivered during the peakload time period on the required number of days each month every third year thereafter until December 31, 2029, or until 40 percent of demand during the peakload time period is supplied by clean peak resources, whichever occurs earlier.
- An additional 5 percent of electricity delivered during the peakload time period on the required number of days each month by December 31, 2020.
- Requires that each POU, by December 31, 2018, determine the actual percentage of kWh delivered during the peakload time period to its end-use customers that is derived from clean peak resources.
- Requires that each POU procure an additional minimum percentage of kWh delivered during the peakload time period from clean peak resources on at least 15 days every month in accordance with the following schedule:
- An additional 5 percent of electricity delivered during the peakload time period on the required number of days each month by December 31, 2020.
- An additional 6 percent of electricity delivered during the peakload time period on the required number of days each month every third year thereafter until December 31, 2029, or until 40 percent of demand during the peakload time period is supplied by clean peak resources, whichever occurs earlier.
- Defines several terms to guide implementation of the measure including clean peak resources, eligible renewable energy resource, energy storage systems, load-serving entity, peak demand hour, and peakload time period.
EXISTING LAW:
- Requires electric utilities to procure 50 percent of their retail sales of electricity from renewable energy by 2030. This is known as the Renewable Portfolio Standard (RPS). (Public Utilities Code § 399.11 et seq.)
- Requires the Air Resources Board (ARB) to ensure that statewide greenhouse gas (GHG) emissions are reduced to at least 40 percent below the 1990 statewide GHG emissions level no later than December 31, 2030. (Health and Safety Code § 38566)
- Requires the CPUC to determine appropriate targets, if any, for LSEs to procure energy storage systems. Requires LSEs to meet any targets adopted by the CPUC by 2015 and 2020. Requires POUs to set their own targets for the procurement of energy storage and then meet those targets by 2016 and 2021. (Public Utilities Code § 2835 et seq.)
- Directs the CEC and the CPUC, where feasible, to authorize procurement of resources to provide grid reliability services that minimize reliance on system power and fossil fuel resources and, where feasible, cost effective, and consistent with other state policy objectives, increase the use of large- and small-scale energy storage. (Public Utilities Code § 400)
- Requires the CPUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. The portfolio shall rely upon zero carbon-emitting resources to the maximum extent reasonable and be designed to achieve any statewide GHG emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with § 38500) of the Health and Safety Code) or any successor legislation. (Public Utilities Code § 454.51(a))
- Requires the CPUC to adopt a process for each LSE to file an integrated resource plan (IRP) to ensure each meets (a) GHG emissions reduction targets for the electricity sector, (b) the RPS, and (c) other goals and obligations. Requires each LSE to submit an IRP to the CPUC for review. (Public Resources Code § 454.52)
- Requires the governing board of a local POU to adopt an IRP and a process for updating the plan at least once every five years to ensure the utility meets (a) the GHG emissions reduction targets for the electricity sector, (b) the RPS, and (c) other goals and obligations, to be submitted to the CEC for review. Requires the CEC to provide recommendations to correct the deficiencies in the IRP. (Public Resources Code §§ 9621 and 9622)
FISCAL EFFECT: Unknown. This bill is keyed fiscal and will be referred to the Appropriations Committee for its review of the fiscal effect of this bill. It is important to note however that the Appropriations Committee limits its analysis to the impact on overall state agency impacts and cannot assess the impacts of policy on the costs of electricity or gas service to ratepayers.
BACKGROUND:
Meeting the Challenges of Peak Demand – The Independent System Operator, which operates 80 percent of the state’s electric grid, performed an analysis to determine when surplus and limited supplies might occur. It showed that throughout the year, on both weekdays and weekends, supply is expected to be constrained during the peak hours from 4 p.m. to 9 p.m. when the sun is setting and solar output is declining. During the months of July and August, the supplies are even more limited during peak hours, and higher demand begins as early as noon. More interesting, however, is the amount of time that supply is expected to be plentiful or in surplus. With the exception of July and August, on the weekends, supply surplus is expected to occur during “super off-peak” hours from 10 a.m. to 4 p.m. when solar generation is at its highest. Similarly, surplus conditions are expected during this same time period on March and April weekdays, when weather is mild and air conditioning use is at a minimum. Additionally, supply is projected to be generally plentiful starting at 9 p.m. through the next morning or afternoon, depending on the month.
There are several strategies available to address what is now commonly referred to as the “Duck Curve” and specifically the neck of the duck when intermittent renewable resources fall in production and demand increases. These include time-of-use rates (in development by the IOUs) using lower prices and incentives to drive consumers to shift electric consumption to off-peak peak periods, energy storage, demand response, energy efficiency (particularly targeted for time and location), and large hydroelectric generation which, although not RPS eligible, is a GHG resource and can at times be plentiful such as this year.
COMMENTS:
- Author’s Statement. California’s goals of 50% RPS by 2030, 40% GHG reduction below 1990 levels by 2030, and providing reliable, cost-effective electricity to energy customers are laudable but ultimately incongruous in the absence of a policy framework and new market mechanisms to allow CAISO to manage the impacts of increasing renewables penetration. To balance these goals, clean resources must provide two functions that they have not traditionally been able to, but now can provide: deployment during peak demand and essential reliability services. CAISO, the CPUC and the electric utilities need new rules and market mechanisms to facilitate these services in order to ensure a clean, reliable grid.
- Integrated Resource Planning. Among the policies of SB 350 in 2015 was the requirement that all load serving entities – ESPs, CCAs, IOUs – and POUs file integrated resource plans. The plans are intended to show how the LSEs and POUs will achieve GHG reduction targets and RPS mandates. And the plans must also at the same time: fulfill the obligation of just and reasonable rates, minimize ratepayer impact, ensure system and local reliability; strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities; enhance distribution systems and demand-side energy management; and minimize localized air pollutants and other GHG emission, with early priority on disadvantaged communities.
This “umbrella” process combines all of the state’s electric procurement mandates, policies, and programs into one umbrella plan to achieve goals and ensure California has a safe, reliable, and cost-effective electricity supply.
The author points to a recent study “Evolving the RPS: A Clean Peak Standard for a Smarter Renewable Future” which notes that a “simple MWH-based standard lacks specific market signals that differentiate between the value of each renewable MWh based on the time when it is produced. Discrepancies in this value could lead to RPS compliance being met by a set of MWhs with very unequal grid-related benefits and unequal fuel-related benefits.”
The author is raising a critical issue facing the state. California’s RPS goals are based on MWhs and although the program requires procurement to be based on “least-cost/best-fit” the “fit” seems to have been dropped on the cutting room floor long ago. This lack of planning for fit has significantly contributed to the Duck Curve which this bill was designed to address. However, the Legislature has previously addressed this issue in SB 350 to integrate several procurement goals with GHG reduction goals and is now reflected in the IRP.
- Impact on Integrated Resource Planning. Last year the CPUC opposed several bills that included specific clean energy resource mandates since such favoring would impact the goals of integrated resource planning. As the CPUC noted in an August 2016 memorandum, “A critical outcome of the IRP process will be to better optimize clean energy resources so that GHG emission reduction targets are met at the lowest possible cost to ratepayers. Granting certain types of resources procurement priority works against the objective of the IRPs, specifically the requirement that the CPUC identify a ‘diverse and balanced portfolio of resources.’”
Procurement plans detail what is going to be procured and how it will be done. These plans must adhere to state policies, including the loading order, which mandates that energy efficiency and demand response be pursued first, followed by renewables and lastly clean-fossil generation. If the procurement plans do not comply with state policies and adequately balance safety, reliability, cost, and environmental goals, the load serving entities will be ordered to modify them.
Unlike other states with RPS mandates, California has GHG reduction requirements which are the penultimate guidepost to ensure that the generation resources used to address peakload is as clean as possible. To overlay a clean peak program mandate outside of the IRP as suggested by this measure on 80 LSEs and POUs in the state seems unnecessary and cumbersome. Consequently, the committee may wish to consider, striking the content of this measure and instead direct that the LSEs and POUs include new targets or requirements for clean energy technology, demand response and energy efficiency, to the extent doing so ensures each LSE meets net-load peak energy and reliability needs while reducing the need for new electricity generation, thus achieving the state’s goals at the least cost to ratepayers. The amendments follow and would also align this measure with SB 338 (Skinner):
Section 454.52 of the Public Utilities Code is amended to read:
- As used in this section, “net-load peak” means the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by variable renewable generation directly connected to the Independent System Operator grid.
(b)(1) Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
- Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sector’s percentage in achieving the economy wide GHG emissions reductions of 40 percent from 1990 levels by 2030.
(B) Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C) Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D) Minimize impacts on ratepayers’ bills.
(E) Ensure system and local reliability.
(F) Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G) Enhance distribution systems and demand-side energy management.
(H) Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2) In furtherance of (1), the commission shall establish policies or procedures, including new targets or requirements for clean energy technology, demand response and energy efficiency, to the extent doing so ensures each load-serving entity meets net-load peak energy and reliability needs while reducing the need for new electricity generation, thus achieving the state’s goals at the least cost to ratepayers.
Section 9621 of the Public Utilities Code is amended to read:
(a) As used in this section, “net-load peak” means the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by variable renewable generation directly connected to the Independent System Operator grid.
(b)(a) This section shall apply to a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatt-hours, as determined on a three-year average commencing January 1, 2013.
(c)(b) On or before January 1, 2019, the governing board of a local publicly owned electric utility shall adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility achieves all of the following:
(1) Meets the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each local publicly-owned electric utility that reflect the electricity sector’s percentage in achieving the economy wide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(2) Ensures procurement of at least 50 percent eligible renewable energy resources by 2030 consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(3) Meets the goals specified in subparagraphs (C) to (H), inclusive, of paragraph (1) of subdivision (a) of Section 454.52.
(c) (1) The integrated resource plan shall address procurement for the following:
(A) Energy efficiency and demand response resources pursuant to Section 9615.
(B) Energy storage requirements pursuant to Chapter 7.7 (commencing with Section 2835) of Part 2 of Division 1.
(C) Transportation electrification.
(D) A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.
(E) The resource adequacy requirements established pursuant to Section 9620.
(d) In furtherance of (b), the governing board of a local publicly owned electric utility shall consider establishing policies or procedures, including new targets or requirements for clean energy technology, demand response and energy efficiency, to the extent doing so ensures each load-serving entities meets net-load peak energy and reliability needs while reducing the need for new electricity generation and new transmission, thus achieving the state’s goals at the least cost to ratepayers.
Section 400.1 is added to the Public Utilities Code, to read:
(a) “Net-load peak” is the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by generation on the customer side of the meter.
(b) On or before January 1, 2020, the commission and the Energy Commission, in consultation with the Independent System Operator, shall establish policies or procedures to ensure that load serving entities meet net-load peak energy and reliability needs while minimizing the use of fossil fuels and utilizing low-carbon technologies and electrical grid management strategies.
(c) In furtherance of subdivision (a), the commission and the Energy Commission may consider establishing new targets or requirements for energy technology that minimizes the percent of load met by fossil fuels during net-load peak energy demand and maximizes the use of low-carbon technologies to meet energy and capacity needs, including, but not limited to, any of the following:
(1) Energy storage.
(2) Demand response or demand management technology.
(3) Energy efficiency.
(4) Hydroelectric power.
Section 913.13 is added to the Public Utilities Code, to read:
No later than January 1, 2022, and every four years thereafter, the commission shall report to the Legislature on all of the following:
(a) The percent of overall energy needs met through the use of fossil-fueled electrical generation during net-load peak demand, as defined in Section 400.1.
(b) The commission’s efforts to reduce the percentage of energy needs met through the use of fossil-fueled electrical generation.
- Related Legislation. SB 338 (Skinner) Requires, on or before January 1, 2020, for the CPUC and CEC, in consultation with the ISO, to establish policies or procedures to minimize the use of fossil fuels used to meet net-load peak demand. Status: Passed Senate Energy Committee; pending hearing in Senate Environmental Quality Committee.
REGISTERED SUPPORT / OPPOSITION:
Support
California Energy Storage Alliance
Outback Power Technologies, Inc.
Tesla, Inc.
Support If Amended
8minuteenergy
Opposition
California Chamber Of Commerce
California Municipal Utilities Association
Coalition of California Utility Employees
Independent Energy Producers Association
Pacific Gas and Electric Company
SMUD
Southern California Edison
Analysis Prepared by: Kellie Smith / U. & E. /
Discussed in Hearing
Senate Standing Committee on Appropriations
Senate Standing Committee on Energy, Utilities and Communications
Assembly Floor
Assembly Standing Committee on Appropriations
Assembly Standing Committee on Utilities and Energy
Bill Author
Bill Co-Author(s):