AB 157: Richmond-San Rafael Bridge.
- Session Year: 2015-2016
- House: Assembly
- Latest Version Date: 2015-10-01
Existing law specifies the powers and duties of the Department of Transportation, the Metropolitan Transportation Commission, and the Bay Area Toll Authority with respect to the collection and expenditure of toll revenue from the 7 state-owned toll bridges within the geographic jurisdiction of the commission, including the Richmond-San Rafael Bridge.
This bill, if the commission and the department develop a project to open the third lane on the Richmond-San Rafael Bridge to automobile traffic on the eastbound level and to bicycle traffic on the westbound level, would authorize the lead agency to complete the design work for the project simultaneously with the environmental review conducted pursuant to the California Environmental Quality Act.
This bill would declare that it is to take effect immediately as an urgency statute.
Existing law specifies the powers and duties of the Department of Transportation, the Metropolitan Transportation Commission, and the Bay Area Toll Authority with respect to the collection and expenditure of toll revenue from the 7 state-owned toll bridges within the geographic jurisdiction of the commission, including the Richmond-San Rafael Bridge.
This bill, if the commission and the department develop a project to open the third lane on the Richmond-San Rafael Bridge to automobile traffic on the eastbound level and to bicycle traffic on the westbound level, would authorize the lead agency to complete the design work for the project simultaneously with the environmental review conducted pursuant to the California Environmental Quality Act.
This bill would declare that it is to take effect immediately as an urgency statute.
Existing law specifies the powers and duties of the Department of Transportation, the Metropolitan Transportation Commission, and the Bay Area Toll Authority with respect to the collection and expenditure of toll revenue from the 7 state-owned toll bridges within the geographic jurisdiction of the commission, including the Richmond-San Rafael Bridge.
This bill, if the commission and the department develop a project to open the third lane on the Richmond-San Rafael Bridge to automobile traffic on the eastbound level and to bicycle traffic on the westbound level, would require authorize the lead agency to complete the design work for the project simultaneously with the environmental review conducted pursuant to the California Environmental Quality Act.
This bill would declare that it is to take effect immediately as an urgency statute.
Existing law specifies the powers and duties of the Department of Transportation, the Metropolitan Transportation Commission, and the Bay Area Toll Authority with respect to the collection and expenditure of toll revenue from the 7 state-owned toll bridges within the geographic jurisdiction of the commission, including the Richmond-San Rafael Bridge.
This bill, if the commission and the department develop a project to open the third lane on the Richmond-San Rafael Bridge to automobile traffic on the eastbound level and to bicycle traffic on the westbound level, would require the lead agency to complete the design work for the project simultaneously with the environmental review conducted pursuant to the California Environmental Quality Act.
This bill would declare that it is to take effect immediately as an urgency statute.
The Legislature finds and declares all of the following:
(a)The Richmond-San Rafael Bridge opened on September 1, 1956. At the time of construction, the bridge was one of the longest bridges in the world and was constructed at a cost of $62 million.
(b)The initial construction, with the help of additional funding provided by the state (Chapter 159 of the Statutes of 1955), provided for the construction of six 12-foot wide lanes. The six lanes were initially comprised of three lanes in both the eastbound and westbound directions.
(c)In 1977, the little-used third lane on the Richmond-San Rafael Bridge was closed to allow for a pipeline to transport eight million gallons of water a day from the East Bay Municipal Utility District to drought stricken Marin County. In 1978, the pipeline was removed and the third lane was restriped as an emergency shoulder.
(d)In 1989, following the Loma Prieta earthquake and the closure of the San Francisco Bay Bridge from October 17 to November 18, inclusive, the third lane on the Richmond-San Rafael Bridge was opened in both the eastbound and westbound directions to help ease traffic flow across the bay.
(e)The possibility of opening the Richmond-San Rafael Bridge to bicycle and pedestrian access has been debated for over three decades since the 1977 closure of the third lane. In 2001, plans for bicycle access were rejected by the Department of Transportation for safety reasons. Alternative plans to open the bridge to bicycle and pedestrian access that address safety are currently under development.
(f)The total estimated cost of reestablishing the third lane of traffic in the eastbound direction on the Richmond-San Rafael Bridge, reconfiguring the bike path on the east side of the bridge, and constructing a bike path on the westbound level of the bridge is $65 million.
(g)In the interest of improving traffic flow, maximizing existing resources, and reducing the environmental impacts resulting from the traffic backup on the eastbound bridge approach that impacts traffic on Highway 101, it is necessary that the third lane of the bridge be opened to traffic at the earliest possible date.
SEC. 2.Section 30910.7 is added to the Streets and Highways Code, to read:30910.7.If the Metropolitan Transportation Commission and the department develop a project to open the third lane on the Richmond-San Rafael Bridge to automobile traffic on the eastbound level and to bicycle traffic on the westbound level, the lead agency may, to the extent feasible, complete the design work for the project simultaneously with the environmental review conducted pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
SEC. 3.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to open the third lane of the Richmond-San Rafael Bridge to traffic at the earliest possible date, it is necessary for this act to take effect immediately.
The Legislature finds and declares all of the following:
(a)The Richmond-San Rafael Bridge opened on September 1, 1956. At the time of construction, the bridge was one of the longest bridges in the world and was constructed at a cost of $62 million.
(b)The initial construction, with the help of additional funding provided by the state (Chapter 159 of the Statutes of 1955), provided for the construction of six 12-foot wide lanes. The six lanes were initially comprised of three lanes in both the eastbound and westbound directions.
(c)In 1977, the little-used third lane on the Richmond-San Rafael Bridge was closed to allow for a pipeline to transport eight million gallons of water a day from the East Bay Municipal Utility District to drought stricken Marin County. In 1978, the pipeline was removed and the third lane was restriped as an emergency shoulder.
(d)In 1989, following the Loma Prieta earthquake and the closure of the San Francisco Bay Bridge from October 17 to November 18, inclusive, the third lane on the Richmond-San Rafael Bridge was opened in both the eastbound and westbound directions to help ease traffic flow across the bay.
(e)The possibility of opening the Richmond-San Rafael Bridge to bicycle and pedestrian access has been debated for over three decades since the 1977 closure of the third lane. In 2001, plans for bicycle access were rejected by the Department of Transportation for safety reasons. Alternative plans to open the bridge to bicycle and pedestrian access that address safety are currently under development.
(f)The total estimated cost of reestablishing the third lane of traffic in the eastbound direction on the Richmond-San Rafael Bridge, reconfiguring the bike path on the east side of the bridge, and constructing a bike path on the westbound level of the bridge is $65 million.
(g)In the interest of improving traffic flow, maximizing existing resources, and reducing the environmental impacts resulting from the traffic backup on the eastbound bridge approach that impacts traffic on Highway 101, it is necessary that the third lane of the bridge be opened to traffic at the earliest possible date.
SEC. 2.Section 30910.7 is added to the Streets and Highways Code, to read:30910.7.If the Metropolitan Transportation Commission and the department develop a project to open the third lane on the Richmond-San Rafael Bridge to automobile traffic on the eastbound level and to bicycle traffic on the westbound level, the lead agency may, to the extent feasible, complete the design work for the project simultaneously with the environmental review conducted pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
SEC. 3.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to open the third lane of the Richmond-San Rafael Bridge to traffic at the earliest possible date, it is necessary for this act to take effect immediately.
The Legislature finds and declares all of the following:
(a)The Richmond-San Rafael Bridge opened on September 1, 1956. At the time of construction, the bridge was one of the longest bridges in the world and was constructed at a cost of $62 million.
(b)The initial construction, with the help of additional funding provided by the state (Chapter 159 of the Statutes of 1955), provided for the construction of six 12-foot wide lanes. The six lanes were initially comprised of three lanes in both the eastbound and westbound directions.
(c)In 1977, the little-used third lane on the Richmond-San Rafael Bridge was closed to allow for a pipeline to transport eight million gallons of water a day from the East Bay Municipal Utility District to drought stricken Marin County. In 1978, the pipeline was removed and the third lane was restriped as an emergency shoulder.
(d)In 1989, following the Loma Prieta earthquake and the closure of the San Francisco Bay Bridge from October 17 to November 18, inclusive, the third lane on the Richmond-San Rafael Bridge was opened in both the eastbound and westbound directions to help ease traffic flow across the bay.
(e)The possibility of opening the Richmond-San Rafael Bridge to bicycle and pedestrian access has been debated for over three decades since the 1977 closure of the third lane. In 2001, plans for bicycle access were rejected by the Department of Transportation for safety reasons. Alternative plans to open the bridge to bicycle and pedestrian access that address safety are currently under development.
(f)The total estimated cost of reestablishing the third lane of traffic in the eastbound direction on the Richmond-San Rafael Bridge, reconfiguring the bike path on the east side of the bridge, and constructing a bike path on the westbound level of the bridge is $65 million.
(g)In the interest of improving traffic flow, maximizing existing resources, and reducing the environmental impacts resulting from the traffic backup on the eastbound bridge approach that impacts traffic on Highway 101, it is necessary that the third lane of the bridge be opened to traffic at the earliest possible date.
SEC. 2.Section 30910.7 is added to the Streets and Highways Code, to read:30910.7.If the Metropolitan Transportation Commission and the department develop a project to open the third lane on the Richmond-San Rafael Bridge to automobile traffic on the eastbound level and to bicycle traffic on the westbound level, the lead agency shall, may, to the extent feasible, complete the design work for the project simultaneously with the environmental review conducted pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
SEC. 3.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to open the third lane of the Richmond-San Rafael Bridge to traffic at the earliest possible date, it is necessary for this act to take effect immediately.
The Legislature finds and declares all of the following:
(a)The Richmond-San Rafael Bridge opened on September 1, 1956. At the time of construction, the bridge was one of the longest bridges in the world and was constructed at a cost of $62 million.
(b)The initial construction, with the help of additional funding provided by the state (Chapter 159 of the Statutes of 1955), provided for the construction of six 12-foot wide lanes. The six lanes were initially comprised of three lanes in both the eastbound and westbound directions.
(c)In 1977, the little-used third lane on the Richmond-San Rafael Bridge was closed to allow for a pipeline to transport eight million gallons of water a day from the East Bay Municipal Utility District to drought stricken Marin County. In 1978, the pipeline was removed and the third lane was restriped as an emergency shoulder.
(d)In 1989, following the Loma Prieta earthquake and the closure of the San Francisco Bay Bridge from October 17 to November 18, inclusive, the third lane on the Richmond-San Rafael Bridge was opened in both the eastbound and westbound directions to help ease traffic flow across the bay.
(e)The possibility of opening the Richmond-San Rafael Bridge to bicycle and pedestrian access has been debated for over three decades since the 1977 closure of the third lane. In 2001, plans for bicycle access were rejected by the Department of Transportation for safety reasons. Alternative plans to open the bridge to bicycle and pedestrian access that address safety are currently under development.
(f)The total estimated cost of reestablishing the third lane of traffic in the eastbound direction on the Richmond-San Rafael Bridge, reconfiguring the bike path on the east side of the bridge, and constructing a bike path on the westbound level of the bridge is $65 million.
(g)In the interest of improving traffic flow, maximizing existing resources, and reducing the environmental impacts resulting from the traffic backup on the eastbound bridge approach that impacts traffic on Highway 101, it is necessary that the third lane of the bridge be opened to traffic at the earliest possible date.
SEC. 2.Section 30910.7 is added to the Streets and Highways Code, to read:30910.7.If the Metropolitan Transportation Commission and the department develop a project to open the third lane on the Richmond-San Rafael Bridge to automobile traffic on the eastbound level and to bicycle traffic on the westbound level, the lead agency shall, to the extent feasible, complete the design work for the project simultaneously with the environmental review conducted pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
SEC. 3.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to open the third lane of the Richmond-San Rafael Bridge to traffic at the earliest possible date, it is necessary for this act to take effect immediately.
|
Date
|
Status
|
|---|---|
| Oct 1, 2015 | Chaptered by Secretary of State - Chapter 393, Statutes of 2015. |
| Oct 1, 2015 | Approved by the Governor. |
| Sep 14, 2015 | Enrolled and presented to the Governor at 4 p.m. |
| Sep 1, 2015 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 74. Noes 3. Page 2730.). |
| Sep 1, 2015 | Assembly Rule 77 suspended. (Page 2729.) |
| Sep 1, 2015 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 74. Noes 3.). |
| Sep 1, 2015 | Assembly Rule 77 suspended. |
| Aug 31, 2015 | Read third time. Urgency clause adopted. Passed. Ordered to the Assembly. (Ayes 40. Noes 0. Page 2290.). |
| Aug 31, 2015 | In Assembly. Concurrence in Senate amendments pending. May be considered on or after September 2 pursuant to Assembly Rule 77. |
| Aug 31, 2015 | Read third time. Urgency clause adopted. Passed. Ordered to the Assembly. |
| Aug 17, 2015 | Read second time. Ordered to third reading. |
| Jul 16, 2015 | From committee: Do pass. (Ayes 6. Noes 0.) (July 15). |
| Jul 8, 2015 | From committee: Do pass and re-refer to Com. on E.Q. (Ayes 11. Noes 0.) (July 7). Re-referred to Com. on E.Q. |
| Jun 25, 2015 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on T. & H. |
| May 7, 2015 | Referred to Coms. on T. & H. and E.Q. |
| Mar 26, 2015 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Mar 26, 2015 | Read third time. Urgency clause adopted. Passed. Ordered to the Senate. (Ayes 75. Noes 0. Page 712.). |
| Mar 25, 2015 | Read second time. Ordered to third reading. |
| Mar 24, 2015 | From committee: Do pass. (Ayes 15. Noes 0.) (March 23). |
| Feb 2, 2015 | Referred to Com. on TRANS. |
| Jan 21, 2015 | From printer. May be heard in committee February 20. |
| Jan 20, 2015 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 1, 2015 | AB 157 LEVINE Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Aug 31, 2015 | Assembly 3rd Reading AB157 Levine By McGuire Urgency Clause | Senate Floor |
Passed |
|
| Jul 15, 2015 | Do pass | Senate Standing Committee on Environmental Quality |
Passed |
|
| Jul 7, 2015 | Do pass, but first be re-referred to the Committee on [Environmental Quality] | Senate Standing Committee on Transportation and Housing |
Passed |
|
| Mar 26, 2015 | AB 157 LEVINE Third Reading Urgency | Assembly Floor |
Passed |
|
| Mar 23, 2015 | Do pass. | Assembly Standing Committee on Transportation |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
AB 157
Page 2
CONCURRENCE IN SENATE AMENDMENTS
AB 157
(Levine)
As Amended June 25, 2015
2/3 vote. Urgency
ASSEMBLY: |
75-0 |
(March 26, 2015) |
SENATE: |
40-0 |
(August 31, 2015) |
Original Committee Reference: TRANS.
SUMMARY: Authorizes an environmental review to be completed concurrent with design work for a project to open a third lane in each direction on the Richmond-San Rafael Bridge, under certain conditions.
The Senate amendments authorize, rather than require, the environmental review for the project to be completed concurrent with design work.
AS PASSED BY THE ASSEMBLY, this bill:
Made legislative findings and declarations regarding the history of the Richmond-San Rafael Bridge and of a planned project to improve traffic flow on the bridge by re-opening a third lane to vehicle traffic in the eastbound direction and to bicycle traffic in the westbound direction.
Required, to the extent possible, environmental work and design work be done concurrently on the project if the Metropolitan Transportation Commission (MTC) and the California Department of Transportation (Caltrans) develop such a project.
Included an urgency clause, allowing this bill's provisions to take effect immediately.
FISCAL EFFECT: Unknown. This bill is keyed non-fiscal by the Legislative Counsel.
COMMENTS: The Richmond-San Rafael Bridge originally opened in 1956 with three lanes of vehicular traffic in each direction. In the 1970s, one lane of the bridge was temporarily closed to allow for an aqueduct to transport water to a drought-stricken Marin. Even though the aqueduct was later removed, the bridge continues to operate with two traffic lanes in each direction.
The author introduced this bill to address growing concerns about congestion delays in the Richmond-San Rafael Bridge corridor. According to the Bay Area Toll Authority (BATA), a public instrumentality governed by the same board that governs MTC, regional population growth and local business developments in Marin County have resulted in significant traffic increases on eastbound Interstate 580 (I-580) and the bridge approach during evening peak commute periods. BATA also reports that the congestion in the bridge corridor backs up traffic on northbound United States Highway 101 in Marin County. In addition to traffic congestion, the current configuration on the bridge (two lanes in each direction) does not allow for bicycle and pedestrian facilities. As a result, there is a significant gap in the 270-mile Bay Trail, reportedly one of the most heavily used recreation and non-motorized transportation assets in the region.
Earlier this year, BATA voted to proceed with the I-580 Access Improvement Project. The project includes improvements for motorists, bicyclists, and pedestrians in the Richmond-San Rafael Bridge corridor. Proposed improvements include opening a third lane of vehicular traffic in the eastbound direction of I-580 from Marin County to Contra Costa County (across the bridge) and converting an existing shoulder in the westbound direction of the bridge to a barrier-separated path for bicyclists and pedestrians.
BATA's action authorized its staff to proceed with a "design-at-risk" strategy (i.e., begin design in advance of environmental clearance) to shorten the timeframe for opening all improvements. BATA's stated goal is to complete the final design and be able to advertise for construction at the completion of the environmental review. According to the author, the design-at-risk strategy will expedite completion of the project by as much as 18 months.
Assembly Transportation Committee staff concerns: As amended in the Senate, this bill authorizes, rather than requires, BATA to proceed with a design-at-risk strategy. However, since BATA is already pursuing this approach, it is not clear why this bill is necessary.
Analysis Prepared by: Janet Dawson / TRANS. / (916) 319-2093 FN: 0001286
AB 157
Page 4
|
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 |
THIRD READING
Bill No: AB 157
Amended: 6/25/15 in Senate
SENATE TRANS. & HOUSING COMMITTEE: 11-0, 7/7/15
AYES: Beall, Cannella, Allen, Bates, Gaines, Galgiani, Leyva, McGuire, Mendoza, Roth, Wieckowski
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 6-0, 7/15/15
AYES: Gaines, Bates, Hill, Jackson, Leno, Pavley
NO VOTE RECORDED: Wieckowski
ASSEMBLY FLOOR: 75-0, 3/26/15 - See last page for vote
SUBJECT: Richmond-San Rafael Bridge
DIGEST: This bill allows an environmental review to be completed concurrently with the design work for a project opening the third lane in each direction on the Richmond-San Rafael Bridge.
Existing law:
Creates the Metropolitan Transportation Commission (MTC) as the transportation planning, coordinating, and financing agency for the nine-county San Francisco Bay Area.
Creates the Bay Area Toll Authority (BATA) to administer the base $1 auto toll for the San Francisco Bay Area’s seven state-owned toll bridges. BATA operates under the same board that governs MTC; however, they are separate entities. In 2005, BATA’s responsibilities were expanded to include administration of all toll revenues and joint oversight of the toll bridge construction program along with the California Department of Transportation (Caltrans) and the California Transportation Commission.
Requires state and local agencies, pursuant to the California Environmental Quality Act (CEQA), to identify significant environmental impacts of discretionary projects and to avoid or mitigate those impacts, if feasible. Lead agencies are required to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for the project.
This bill authorizes MTC and Caltrans to complete the design work at the same time as the environmental review for a project opening the third lane on the Richmond-San Rafael Bridge to automobile traffic on the eastbound level and to bicycle traffic on the westbound level.
Background
When the Richmond-San Rafael Bridge originally opened in 1956, it served traffic in six 12-foot-wide lanes — three lanes in both the eastbound and westbound directions. In 1977, a then-underutilized third lane was closed to allow for a pipeline to transport water from the East Bay to Marin County. In 1978, the pipeline was removed and the third lane was restriped as an emergency shoulder. In 1989, following the Loma Prieta earthquake and the closure of the San Francisco Bay Bridge, the third lane on the Richmond-San Rafael Bridge was opened in both directions for one month to help ease traffic flow across the bay.
CEQA challenges. Environmental studies and design work for projects are typically separated, but they needn’t be. Lead agencies can choose to “design-at-risk,” meaning that design work precedes environmental clearance, to shorten completion time of projects. This strategy is not unheard of; however, it can open the door to legal challenges under CEQA because it may appear that the EIR is biased and tailored to fit a pre-determined outcome, namely a finished design.
The circumstances surrounding the Richmond-San Rafael Bridge project are different, as the newly proposed third traffic lane has been open to vehicles in the past, so a design can be based off this proven, previously functioning model.
Necessity of the bill. In February, the BATA Oversight Committee approved a contract for the completion of final plans for the Richmond-San Rafael Bridge project. These plans are to occur concurrently with the effort to obtain project approval and the environmental review activities. This recent action shaves time off the project, which calls into question the necessity of this bill and how it will actually help in achieving the author’s stated intent. However, supporters believe that this bill will help the project to be further expedited.
Comments
Purpose. According to the author, this bill is necessary to reduce the amount of time to completion for the Richmond-San Rafael Bridge project and therefore significantly reduce commuter congestion.
FISCAL EFFECT: Appropriation: No Fiscal Com.: No Local: No
American Federation of State, County and Municipal Employees
Bay Area Council
Bay Area Toll Authority
City of San Rafael
Marin County Board of Supervisors
Marin County Council of Mayors and Councilmembers
North Bay Leadership Council
State Building and Construction Trades Council of California
Transportation Authority of Marin
United Contractors
OPPOSITION: (Verified 8/19/15)
None received
ASSEMBLY FLOOR: 75-0, 3/26/15
AYES: Achadjian, Alejo, Travis Allen, Baker, Bigelow, Bloom, Bonilla, Bonta, Brough, Brown, Burke, Calderon, Campos, Chang, Chau, Chávez, Chiu, Chu, Cooley, Cooper, Dababneh, Dahle, Daly, Dodd, Eggman, Beth Gaines, Cristina Garcia, Eduardo Garcia, Gatto, Gipson, Gomez, Gonzalez, Gordon, Gray, Grove, Hadley, Harper, Roger Hernández, Holden, Irwin, Jones, Kim, Lackey, Levine, Linder, Lopez, Low, Maienschein, Mayes, McCarty, Medina, Melendez, Mullin, Nazarian, Obernolte, O'Donnell, Olsen, Patterson, Perea, Quirk, Ridley-Thomas, Rodriguez, Salas, Santiago, Steinorth, Mark Stone, Thurmond, Ting, Wagner, Waldron, Weber, Wilk, Williams, Wood, Atkins
NO VOTE RECORDED: Frazier, Gallagher, Jones-Sawyer, Mathis, Rendon
Prepared by: Christine Hochmuth / T. & H. / (916) 651-4121
8/19/15 20:23:17
**** END ****
AB 157 (Levine) Page 6 of 6
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Wieckowski, Chair
2015 - 2016 Regular
Bill No: AB 157
Author: |
Levine |
||
Version: |
6/25/2015 |
Hearing Date: |
7/15/2015 |
Urgency: |
Yes |
Fiscal: |
No |
Consultant: |
Joanne Roy |
||
SUBJECT: Richmond-San Rafael Bridge
ANALYSIS:
Existing law:
Under the National Environmental Protection Act (NEPA), requires federal agencies to assess the environmental effects of their proposed actions prior to making decisions. Actions include making decisions on permit applications, adopting federal land management actions, and constructing highways and other publicly-owned facilities. (42 United States Code §4321 et seq.).
Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration, mitigated declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines). (Public Resources Code (PRC) §21000 et seq.).
States, “The environmental document preparation and review should be coordinated in a timely fashion with the existing planning, review, and project approval processes being used by each public agency. These procedures, to the maximum extent feasible, are to run concurrently, not consecutively, when included as part of the regular project report if such a report is used in its existing review and budgetary process.” (CEQA Guidelines §15004(c)).
Provides that public agencies should reduce delay and paperwork by integrating the CEQA process into early planning. (CEQA Guidelines §15006).
Creates the Metropolitan Transportation Commission (MTC) as a local area planning agency to provide comprehensive regional transportation planning for the region comprised of the City and County of San Francisco and the Counties of Alameda, Contra Costa, Marin, Napa, San Mateo, Santa Clara, Solano, and Sonoma. (Government Code §66500 et seq.).
Creates the Bay Area Toll Authority (BATA) as a public instrumentality governed by the same board as that governing the MTC. The authority is, however, a separate entity from the MTC. (Streets and Highways Code §30950).
This bill:
Makes legislative findings and declarations regarding the history of the Richmond-San Rafael Bridge and of a planned project to improve traffic flow on the bridge by re-opening a third lane to vehicle traffic in the eastbound direction and to bicycle traffic in the westbound direction.
Authorizes, to the extent possible, environmental work and design work be done concurrently on the project if the MTC and the California Department of Transportation (Caltrans) develop such a project.
Includes an urgency clause in order to open the third lane of the bridge to traffic at the earliest possible date.
Background
NEPA. NEPA was one of the first laws ever written that establishes the broad national framework for protecting the environment. NEPA’s basic policy is to assure that all branches of government give proper consideration to the environment prior to undertaking major federal action that significantly affects the environment. NEPA requirements are invoked when airports, buildings, military complexes, highways, parkland purchases, and other federal activities are proposed. Environmental Assessments and Environmental Impact Statements, which are assessments of the likelihood of impacts from alternative courses of action, are required from all federal agencies.
CEQA: Environmental review process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, then the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received an environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
If a mitigation measure would cause one or more significant effects in addition to those that would be caused by the proposed project, the effects of the mitigation measure must be discussed but in less detail than the significant effects of the proposed project.
CEQA: What is analyzed in an environmental review? Pursuant to CEQA, an environmental review analyzing the significant direct and indirect environmental impacts of a proposed project, may include water quality, surface and subsurface hydrology, land use and agricultural resources, transportation and circulation, air quality and greenhouse gas emissions, terrestrial and aquatic biological resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, cultural resources, and tribal cultural resources.
The analysis must also evaluate the cumulative impacts of any past, present, and reasonably foreseeable projects/activities within study areas that are applicable to the resources being evaluated. A study area for a proposed project must not be limited to the footprint of the project because many environmental impacts of a development extend beyond the identified project boundary. Also, CEQA stipulates that the environmental impacts must be measured against existing physical conditions within the project area, not future, allowable conditions.
Richmond-San Rafael Bridge. The Richmond-San Rafael Bridge originally opened in 1956 with three lanes of vehicular traffic in each direction. In the 1970s, one lane of the bridge was temporarily closed to allow for an aqueduct to transport water to a drought-stricken Marin. Even though the aqueduct was later removed, the bridge continues to operate with two traffic lanes in each direction.
Comments
Purpose of Bill. According to the author, “Traffic gridlock on the Richmond-San Rafael Bridge is one of the worst in the Bay Area. The Richmond-San Rafael Bridge was originally constructed and operated with six 12-foot wide lanes, three in the eastbound and three in the westbound directions. Third lane was closed in 1977 to allow for a pipeline to transport water during drought. Since that time the third lane has been used as an emergency should with the exception of the month following the 1989 Loma Prieta earthquake when the lane was opened to help ease traffic across the bay from the closure of the Bay Bridge.
“Performing the design work simultaneously with the environmental work will expedite the Richmond-San Rafael third lane project by as much as 18 months. This bill makes clear that the design work can be done concurrently with the environmental review.”
Congestion. The author introduced this bill to address growing concerns about congestion delays in the Richmond-San Rafael Bridge corridor. According to BATA, regional population growth and local business developments in Marin County have resulted in significant traffic increases on eastbound Interstate 580 (I-580) and the bridge approach during evening peak commute periods. BATA also reports that the congestion in the bridge corridor backs up traffic on northbound US 101 in Marin County. The project proposes to convert the shoulder along the span’s lower deck (eastbound direction) to a peak-period lane to relieve traffic congestion.
Bicycle and pedestrians. The current configuration on the bridge (two-lanes in each direction) does not allow for bicycle and pedestrian facilities. As a result, there is a gap in the 270-mile Bay Trail, which is reportedly one of the most heavily used recreation and non-motorized transportation assets in the region. The project will install a concrete barrier system on the upper deck (westbound direction) of the Richmond-San Rafael Bridge to convert the existing freeway shoulder to a barrier-separated path for bicycles and pedestrians.
What’s the plan? In February, BATA voted to proceed with the I-580 Access Improvement Project. The project includes improvements for motorists, bicyclists, and pedestrians in the Richmond-San Rafael Bridge corridor. Proposed improvements include opening a third lane of vehicular traffic in the eastbound direction of I-580 from Marin County to Contra Costa County (across the bridge) and converting an existing shoulder in the westbound direction of the bridge to a barrier-separated path for bicyclists and pedestrians.
BATA's
February action authorized its staff to proceed with a
"design-at-risk" strategy (i.e., begin design in advance of
environmental clearance) to shorten the timeframe for opening all
improvements. BATA's stated goal is to complete the final design and
be able to advertise for construction at the completion of the
environmental review.
By overlapping elements of the
process, CalTrans states that 1- 1½ years have been shaved off the
timeline of this project. Originally construction was expected to
start in 2017; and complete and open to traffic the third lane in
late 2018. With the accelerated schedule underway, CalTrans plans to
start construction in 2016 and open the third lane to traffic in late
2017.
Potential public safety issue with third lane. Part of the project area curves and has a retaining wall. The proposed third lane would be located on the inside of the curve – this poses a potential safety issue because of the limited line of sight. For example, a car stalls on the far end of the curve in the third lane; but cars approaching the stalled car from behind may not be able to see the stalled car, due to the curve, and end up crashing into it. One of the issues analyzed in a CEQA environmental review related to transportation/traffic is whether a project substantially increases hazards due to design feature, such as sharp curves. The traffic study has not been completed yet. Is it prudent to encourage the expedition of the environmental review process considering there is a known, potentially significant hazard to public safety?
NEPA. Because the highway is part of the federal Interstate system, environmental approval is not only required pursuant to CEQA, but to NEPA as well. For purposes of NEPA, the project must be in the Metropolitan Planning Organization’s conforming Regional Transportation Plan and Transportation Improvement Program. The Richmond-San Rafael Bridge project is not currently in these planning documents. The purpose of this bill is meant to expedite the project. However, this bill does not have any effect on mandates required at the federal level and would not speed up the NEPA environmental review process. A question arises as to whether this bill would actually bring the project to the construction phase more quickly considering this project is subject to NEPA as well as CEQA.
Is this bill necessary? This bill authorizes, to the extent possible, environmental work and design work to be done concurrently on this project. CEQA Guidelines 15004(c) states, “The environmental document preparation and review should be coordinated in a timely fashion with the existing planning, review, and project approval processes being used by each public agency. These procedures, to the maximum extent feasible, are to run concurrently, not consecutively, when included as part of the regular project report if such a report is used in its existing review and budgetary process.” In addition, CEQA Guidelines 15006 states, “Public agencies should reduce delay and paperwork by…[i]ntegrating the CEQA process into early planning.”
In general, CalTrans, which is the lead agency for this project, states that environmental studies begin when it has enough information to begin studies. Depending on each project, this could begin when 10% to 20% of the design exists.
The purpose of this bill is to make clear that design and environmental review can be done concurrently. However, a question arises as to whether current law and practice already serve the purpose of this bill.
DOUBLE REFERRAL:
This
measure was heard in Senate Transportation & Housing Committee on
July 7, 2015, and passed out of committee with a vote of 11-0.
SOURCE:
Author
SUPPORT:
American Federation of State, County and Municipal Employees
Bay Area Council
Marin County Board of Supervisors
Marin County Council of Mayors and Councilmembers
Metropolitan Transportation Commission
OPPOSITION:
Sierra Club California
-- END --
AB 157 (Levine) Page 3 of 3
SENATE COMMITTEE ON TRANSPORTATION AND HOUSING
Senator Jim Beall, Chair
2015 - 2016 Regular
Bill No: AB 157 Hearing Date: 7/7/2015
Author: |
Levine |
||
Version: |
6/25/2015 |
||
Urgency: |
Yes |
Fiscal: |
No |
Consultant: |
Christine Hochmuth |
||
SUBJECT: Richmond-San Rafael Bridge
DIGEST: This bill allows an environmental review to be completed concurrently with the design work for a project opening the third lane in each direction on the Richmond-San Rafael Bridge.
ANALYSIS:
Existing law:
Creates the Metropolitan Transportation Commission (MTC) as the transportation planning, coordinating, and financing agency for the nine-county San Francisco Bay Area.
Creates the Bay Area Toll Authority (BATA) to administer the base $1 auto toll for the San Francisco Bay Area’s seven state-owned toll bridges. BATA operates under the same board that governs MTC; however, they are separate entities. In 2005, BATA’s responsibilities were expanded to include administration of all toll revenues and joint oversight of the toll bridge construction program along with the California Department of Transportation (Caltrans) and the California Transportation Commission.
Requires state and local agencies, pursuant to the California Environmental Quality Act (CEQA), to identify significant environmental impacts of discretionary projects and to avoid or mitigate those impacts, if feasible. Lead agencies are required to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for the project.
This urgency bill:
Authorizes MTC and Caltrans to complete the design work at the same time as the environmental review for a project opening the third lane on the Richmond-San Rafael Bridge to automobile traffic on the eastbound level and to bicycle traffic on the west bound level.
COMMENTS:
Purpose. According to the author, this bill is necessary to reduce the amount of time to completion for the Richmond-San Rafael Bridge project and therefore significantly reduce commuter congestion.
Background. When the Richmond-San Rafael Bridge originally opened in 1956 it served traffic in six 12-foot-wide lanes — three lanes in both the eastbound and westbound directions. In 1977, a then-underutilized third lane was closed to allow for a pipeline to transport water from the East Bay to Marin County. In 1978, the pipeline was removed and the third lane was restriped as an emergency shoulder. In 1989, following the Loma Prieta earthquake and the closure of the San Francisco Bay Bridge, the third lane on the Richmond-San Rafael Bridge was opened in both directions for one month to help ease traffic flow across the bay.
CEQA challenges. Environmental studies and design work for projects are typically separated, but they needn’t be. Lead agencies can choose to “design-at-risk,” meaning that design work precedes environmental clearance, to shorten completion time of projects. This strategy is not unheard of; however, it can open the door to legal challenges under CEQA because it may appear that the EIR is biased and tailored to fit a pre-determined outcome, namely a finished design.
The circumstances surrounding the Richmond-San Rafael Bridge project are different, as the newly proposed third traffic lane has been open to vehicles in the past, so a design can be based off this proven, previously functioning model.
Necessity of the bill. In February, the BATA Oversight Committee approved a contract for the completion of final plans for the Richmond-San Rafael Bridge project. These plans are to occur concurrently with the effort to obtain project approval and the environmental review activities. This recent action shaves time off the project, which calls into question the necessity of this bill and how it will actually help in achieving the author’s stated intent. However, supporters believe that this bill will help the project to be further expedited.
Double referred. This bill has also been referred to the Senate Environmental Quality Committee.
Assembly Votes:
Floor: 75-0
Trans: 15-0
FISCAL EFFECT: Appropriation: No Fiscal Com.: No Local: No
POSITIONS: (Communicated to the committee before noon on Wednesday,
July 1, 2015.)
SUPPORT:
American Federation of State, County and Municipal Employees
Bay Area Council
Bay Area Toll Authority
City of San Rafael
Marin County Board of Supervisors
Marin County Council of Mayors and Councilmembers
North Bay Leadership Council
State Building and Construction Trades Council of California
Transportation Authority of Marin
United Contractors
OPPOSITION:
None received
-- END --
AB 157
Page 2
ASSEMBLY THIRD READING
AB 157
(Levine)
As Introduced January 20, 2015
2/3 vote. Urgency
Committee |
Votes |
Ayes |
Noes |
Transportation |
15-0 |
Achadjian, Baker, Bloom, Campos, Chu, Daly, Dodd, Eduardo Garcia, Gomez, Kim, Linder, Medina, Melendez, Nazarian, O'Donnell |
|
SUMMARY: Requires an environmental review to be completed concurrent with design work for a project to open a third lane in each direction on the Richmond-San Rafael Bridge, under certain conditions. Specifically, this bill:
Makes legislative findings and declarations regarding the history of the Richmond-San Rafael Bridge and of a planned project to improve traffic flow on the bridge by re-opening a third lane to vehicle traffic in the eastbound direction and to bicycle traffic in the westbound direction.
Requires, to the extent possible, environmental work and design work be done concurrently on the project if the Metropolitan Transportation Commission (MTC) and the California Department of Transportation (Caltrans) develop such a project.
Includes an urgency clause, allowing the bill's provisions to take effect immediately.
EXISTING LAW:
Created MTC as a local area planning agency to provide comprehensive regional transportation planning for the region comprised of the City and County of San Francisco and the Counties of Alameda, Contra Costa, Marin, Napa, San Mateo, Santa Clara, Solano, and Sonoma.
Created the Bay Area Toll Authority (BATA) as a public instrumentality governed by the same board as that governing the MTC. The authority, however, a separate entity from the MTC; vests with the BATA the responsibility to administer all toll revenues from state-owned toll bridges within the geographic jurisdiction of the MTC.
Required state and local agencies, pursuant to the California Environmental Quality Act (CEQA), to identify significant environmental impacts of discretionary projects and to avoid or mitigate those impacts, if feasible; required lead agencies to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for the project.
FISCAL EFFECT: Unknown. This bill is keyed non-fiscal by the Legislative Counsel.
COMMENTS: The Richmond-San Rafael Bridge originally opened in 1956 with three lanes of vehicular traffic in each direction. In the 1970s, one lane of the bridge was temporarily closed to allow for an aqueduct to transport water to a drought-stricken Marin. Even though the aqueduct was later removed, the bridge continues to operate with two traffic lanes in each direction.
The author introduced this bill to address growing concerns about congestion delays in the Richmond-San Rafael Bridge corridor. According to BATA, regional population growth and local business developments in Marin County have resulted in significant traffic increases on eastbound Interstate 580 (I-580) and the bridge approach during evening peak commute periods. BATA also reports that the congestion in the bridge corridor backs up traffic on northbound U.S. Highway 101 in Marin County. In addition to traffic congestion, the current configuration on the bridge (two lanes in each direction) does not allow for bicycle and pedestrian facilities. As a result, there is a significant gap in the 270-mile Bay Trail, reportedly one of the most heavily used recreation and non-motorized transportation assets in the region.
Last month, BATA voted to proceed with the I-580 Access Improvement Project. The project includes improvements for motorists, bicyclists, and pedestrians in the Richmond-San Rafael Bridge corridor. Proposed improvements include opening a third lane of vehicular traffic in the eastbound direction of I-580 from Marin County to Contra Costa County (across the bridge) and converting an existing shoulder in the westbound direction of the bridge to a barrier-separated path for bicyclists and pedestrians.
BATA's February action authorized its staff to proceed with a "design-at-risk" strategy (i.e., begin design in advance of environmental clearance) to shorten the timeframe for opening all improvements. BATA's stated goal is to complete the final design and be able to advertise for construction at the completion of the environmental review. According to the author, the design-at-risk strategy will expedite completion of the project by as much as 18 months.
Assembly Transportation Committee staff concerns:
The author's stated intent with the bill is to speed completion of the project by proceeding with the design-at-risk strategy. However, since BATA is already pursuing this approach, it is not clear why the bill is necessary to expedite the project.
Typically, the goal of an EIR process is to evaluate project alternatives with the aim of avoiding or minimizing impacts to the environment. Most lead agencies are careful to complete this process before beginning design work. One advantage for doing so is to avoid inviting a legal challenge that the EIR is inadequate because the outcome was pre-determined and therefore biased. Agencies do, however, occasionally proceed with design prior to completion of the EIR, just as BATA has with the I-580 Access Improvement Project. Arguably, it may make sound business sense for an agency to proceed with a design-at-risk strategy when, for example, the number of alternatives is limited and the project schedule needs to be accelerated.
The author indicates that his intent in introducing this bill is to specifically ensure that BATA has clear authority to proceed with the design-at-risk strategy. However, this bill goes beyond authorizing a design-risk strategy by, instead, mandating that BATA use this strategy if it pursues this project. In so doing, this bill could effectively absolve BATA of legal risks related to pre-determining the outcome of its EIR, a consequence that goes beyond the author's stated intent and one for which there is no justification presented as to why BATA should uniquely enjoy this protection.
Analysis Prepared by: Janet S. Dawson / TRANS. / (916) 319-2093 FN: 0000084
AB 157
Page 3
Date of Hearing: March 23, 2015
ASSEMBLY COMMITTEE ON TRANSPORTATION
Jim Frazier, Chair
AB 157
(Levine) – As Introduced January 20, 2015
SUBJECT:
Richmond-San Rafael Bridge
SUMMARY:
Requires environmental review to be completed concurrent with design work for a project to open a third lane in each direction on the Richmond-San Rafael Bridge, under certain conditions. Specifically, this bill:
Makes legislative findings and declarations regarding the history of the Richmond-San Rafael Bridge and of a planned project to improve traffic flow on the bridge by re-opening a third lane to vehicle traffic in the eastbound direction and to bicycle traffic in the westbound direction.
Requires, to the extent possible, environmental work and design work be done concurrently on the project if the Metropolitan Transportation Commission (MTC) and the California Department of Transportation (Caltrans) develop such a project.
Includes urgency provisions.
EXISTING LAW:
Created MTC as a local area planning agency to provide comprehensive regional transportation planning for the region comprised of the City and County of San Francisco and the Counties of Alameda, Contra Costa, Marin, Napa, San Mateo, Santa Clara, Solano, and Sonoma.
Created the Bay Area Toll Authority (BATA) as a public instrumentality governed by the same board as that governing the MTC. The authority is, however, a separate entity from the MTC.
Vests with the BATA the responsibility to administer all toll revenues from state-owned toll bridges within the geographic jurisdiction of the MTC.
Requires state and local agencies, pursuant to the California Environmental Quality Act (CEQA), to identify significant environmental impacts of discretionary projects and to avoid or mitigate those impacts, if feasible; requires lead agencies to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for the project.
FISCAL EFFECT:
Unknown
COMMENTS: The Richmond-San Rafael Bridge originally opened in 1956 with three lanes of vehicular traffic in each direction. In the 1970s, one lane of the bridge was temporarily closed to allow for an aqueduct to transport water to a drought-stricken Marin. Even though the aqueduct was later removed, the bridge continues to operate with two traffic lanes in each direction.
The author introduced this bill to address growing concerns about congestion delays in the Richmond-San Rafael Bridge corridor. According to BATA, regional population growth and local business developments in Marin County have resulted in significant traffic increases on eastbound Interstate 580 (I-580) and the bridge approach during evening peak commute periods. BATA also reports that the congestion in the bridge corridor backs up traffic on northbound US 101 in Marin County.
In addition to traffic congestion, the current configuration on the bridge (two-lanes in each direction) does not allow for bicycle and pedestrian facilities. As a result, there is a significant gap in the 270-mile Bay Trail, reportedly one of the most heavily used recreation and non-motorized transportation assets in the region.
Last month, BATA voted to proceed with the I-580 Access Improvement Project. The project includes improvements for motorists, bicyclists, and pedestrians in the Richmond-San Rafael Bridge corridor. Proposed improvements include opening a third lane of vehicular traffic in the eastbound direction of I-580 from Marin County to Contra Costa County (across the bridge) and converting an existing shoulder in the westbound direction of the bridge to a barrier-separated path for bicyclists and pedestrians.
BATA's February action authorized its staff to proceed with a "design-at-risk" strategy (i.e., begin design in advance of environmental clearance) to shorten the timeframe for opening all improvements. BATA's stated goal is to complete the final design and be able to advertise for construction at the completion of the environmental review.
According to the author, the design-at-risk strategy will expedite completion of the project by as much as 18 months.
Committee concerns:
The author's stated intent with the bill is to speed completion of the project by proceeding with the design-at-risk strategy. However, since BATA is already pursuing this approach, it is not clear why the bill is necessary to expedite the project.
Typically, the goal of an EIR process is to evaluate project alternatives with the aim of avoiding or minimizing impacts to the environment. Most lead agencies are careful to complete this process before beginning design work. One advantage for doing so is to avoid inviting a legal challenge that the EIR is inadequate because the outcome was pre-determined and therefore biased.
Agencies do, however, occasionally proceed with design prior to completion of the EIR, just as BATA has with the I-580 Access Improvement Project. Arguably, it may make sound business sense for an agency to proceed with a design-at-risk strategy when, for example, the number of alternatives is limited and the project schedule needs to be accelerated.
The author indicates that his intent in introducing this bill is to specifically ensure that BATA has clear authority to proceed with the design-at-risk strategy. However, this bill goes beyond authorizing a design-risk strategy by, instead, mandating that BATA use this strategy if it pursues this project. In so doing, this bill could effectively absolve BATA of legal risks related to pre-determining the outcome of its EIR, a consequence that goes beyond the author's stated intent and one for which there is no justification presented as to why BATA should uniquely enjoy this protection.
REGISTERED SUPPORT / OPPOSITION:
Support
American Federation of State, County and Municipal Employees, AFL-CIO
Bay Area Council
Marin County Board of Supervisors
State Building & Construction Trades Council
Opposition
None on file
Analysis Prepared by:
Janet Dawson/TRANS./(916) 319-2093
Discussed in Hearing
Assembly Floor
Senate Floor
Senate Standing Committee on Environmental Quality
Senate Standing Committee on Transportation and Housing
Assembly Floor
Assembly Standing Committee on Transportation
Bill Author
Bill Co-Author(s):