Existing law requires the Department of Water Resources, upon appropriation by the Legislature, to provide funding for a project that substantially conforms to the project description for the Reverse Flow Pump-back Facilities on the Friant-Kern Canal Restoration Project, as specified, provided that certain conditions are met. Existing law requires that the appropriation be no more than $7,000,000.
This bill would appropriate $7,000,000 from the General Fund to the department for this project.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Friant-Kern Canal.
The Legislature finds and declares the following:
(a)The Friant-Kern Canal, an aqueduct operated and maintained by the Friant Water Users Authority on behalf of the United States Bureau of Reclamation, conveys water south over 152 miles from Millerton Lake to the Kern River for agricultural and urban customers.
(b)Currently, the Friant-Kern Canal has limited pump-back operational capacity which is used occasionally to deliver water north from the Cross Valley Canal or deliver water extracts from water banks on the Kern River Alluvial Fan.
(c)Construction of the Reverse Flow Pump-back Facilities on the Friant-Kern Canal Restoration Project will improve the Friant Divisions ability to recirculate and return captured restoration flows as part of the San Joaquin River Restoration Program.
(d)The project has the potential to convey between 15,000 and 30,000 acre-feet of water per year from the west side of the San Joaquin Valley, providing needed relief to the east side of the San Joaquin Valley and irrigation water districts after two consecutive years of zero allocation of water supply from the Central Valley Project.
(e)Additional water supplies that would be made available by the construction of the pump-back facilities will reduce the divisions dependence on groundwater wells to offset unreliable surface water deliveries on the west side of the San Joaquin Valley.
SEC. 2.The sum of seven million dollars ($7,000,000) is hereby appropriated from the General Fund to the Department of Water Resources for purposes of Section 140 of the Water Code.
SEC. 3.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the emergency circumstances of the ongoing drought and the benefits that the construction of sustainable water conveyance projects on the Friant-Kern Canal will provide to the region by improving water supply and delivery and increasing drought resiliency by facilitating recovery of banked groundwater.
REVISIONS: HeadingLine 4.|
Date
|
Status
|
|---|---|
| Feb 1, 2018 | From committee: Filed with the Chief Clerk pursuant to Joint Rule 56. |
| Jan 31, 2018 | Died pursuant to Art. IV, Sec. 10(c) of the Constitution. |
| May 26, 2017 | In committee: Held under submission. |
| Apr 5, 2017 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| Mar 30, 2017 | Coauthors revised. |
| Mar 28, 2017 | Coauthors revised. |
| Mar 21, 2017 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 14. Noes 0.) (March 21). Re-referred to Com. on APPR. |
| Jan 30, 2017 | Referred to Com. on W.,P., & W. |
| Jan 19, 2017 | From printer. May be heard in committee February 18. |
| Jan 18, 2017 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Mar 21, 2017 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Water, Parks, and Wildlife |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Date of Hearing: April 5, 2017
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez Fletcher, Chair
ABPCA Bill Id:AB 176
Author:(Salas) – As Introduced Ver:January 18, 2017
Policy Committee: | Water, Parks and Wildlife | Vote: | 14 - 0 |
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill appropriates $7 million General Fund (GF) dollars to the Department of Water Resources (DWR), to fund the Reverse Flow Pump-Back Facilities on the Friant-Kern Canal Restoration Project (Project), as defined in existing law. Specifically, this bill:
- Appropriates $7 million GF to the DWR for the purposes of fully funding, to the extent permitted, the Project.
- Makes findings and declarations on the benefits of the Project and the necessity of a special statute for the Friant-Kern Canal.
FISCAL EFFECT:
Appropriates $7 million GF to DWR for local assistance to the Friant-Kern Can Restoration Project consistent with the San Joaquin River Settlement Agreement, the projects for which are the sole responsibility of the federal government.
COMMENTS:
- Purpose. According to the author, the development of water conveyance facilities can help provide much needed flexibility to assist in the movement of water supplies to regions with the greatest need. The existing network of interregional conveyance does not allow for sufficient flexibility in water supply management. This bill funds a project to help increase water availability and improve water management including enhancing groundwater recharge and banking options.
- Background.
In September 2006, the US Department of Interior and Commerce, the Natural Resources Defense Council, and the Friant Water Users Authority entered into a settlement that ended an 18-year lawsuit to provide sufficient fish habitat in the San Joaquin River below Friant Dam near Fresno. The settlement resulted in the San Joaquin River Restoration Program (SJRRP) which has two goals and objectives: (1) a restored river with continuous flows to the Sacramento-San Joaquin River Delta and naturally reproducing populations of Chinook salmon; and (2) a river management program to minimize water supply impacts to San Joaquin River water users.
The U.S. Bureau of Reclamation (USBR) initiated an investment strategy in support of the SJRRP water management goal. The purpose was to identify projects that, in conjunction with other activities, could cost-effectively reduce or avoid water supply impacts to the Friant Division long-term contractors. USBR, in collaboration with the Friant Contractors, identified, screened, developed, evaluated, and ranked over 500 project concepts to form a implement priority projects. The results were presented in a March 2015 report titled Water Management Goal Investment Strategy: Final Report.
Among other things, the Final Report presented a list of priority projects evaluated at an appraisal level that support the water management goal of the SJRRP. The project that funded through this bill is among the 21 projects evaluated in the Final Report.
- Reverse Flow Pump-Back Facilities on the Friant-Kern Canal. The Friant-Kern Canal is Federal Central Valley Project (CVP) canal that conveys water from Friant Dam on the San Joaquin River near Fresno, southward to various Friant Contractors along the east side of the San Joaquin Valley, terminating at the Kern River near Bakersfield. Currently, the Friant-Kern Canal has limited pump-back operational capacity, which is used occasionally to deliver north the water from the Cross Valley Canal or water extracted from water banks on the Kern River fan. This project would install permanent pump-back facilities with higher capacities along the southern portion of the Friant-Kern Canal. The project would allow water that was released for restoration flows on the San Joaquin River that was then recaptured downstream to be conveyed via the Cross Valley Canal to be pumped back up the Friant-Kern Canal to a number of Friant Contractors.
The Final Report ranked this project 4th of 21, with an estimated cost of $7.6 million, and, including planning and environmental review, a little over 2 years to complete the project.
- Prior State Commitment. AB 935 (Salas) Chapter 601, Statutes of 2016, required the DWR upon appropriation by the Legislature, to fund the Project, not in excess of $7 million.
The 2009 federal legislation appropriated $17 million to conduct feasibility studies for a reverse flow pump back facility similar to, but more expansive than, the Project that is the subject of this bill. The Project is substantially similar to the reverse flow pump-back project described in the Final Report which had an estimated cost of $7.6 million. As of summer 2016 the estimated cost of the Project that is the subject of this bill was $9.3 million with an expected completion time of two-three years. The Federal government has contributed $3.3 million to the Project. Presently the Friant contractors have selected a design and construction firm, and are pursuing a contract for environmental work. The Project has been estimated to convey approximately 15,000-30,000 acre-feet annually and is expected to avoid 2,750 metric tons of carbon emissions over the life of the Project.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: March 21, 2017
ASSEMBLY COMMITTEE ON WATER, PARKS, AND WILDLIFE
Eduardo Garcia, Chair
ABPCA Bill Id:AB 176 (
Author:Salas) – As Introduced Ver:January 18, 2017
SUBJECT: Water project: Friant-Kern Canal
SUMMARY: Appropriates $7 million from the General Fund to the Department of Water Resources (DWR), to fund, as defined in existing law, the Reverse Flow Pump-Back Facilities on the Friant-Kern Canal Restoration Project (Project).
Specifically, this bill:
- Makes findings and declarations on the benefits of the Project.
- Appropriates $7 million from the General Fund to the DWR for the purposes of fully funding, to the extent permitted, the Project.
- Finds and declares the necessity of a special statute for the Friant-Kern Canal.
EXISTING LAW:
- Establishes the DWR within the Natural Resources Agency, which manages and undertakes planning with regard to water resources in the state.
- Requires the DWR, upon appropriation by the Legislature, to grant up to $7 million for the Project.
- Limits the DWR's funding share of the Project to up to 80% of the total.
- Establishes prerequisites to funding, including:
- All feasibility studies are complete and draft environmental impact reports (EIRs) required pursuant to the California Environmental Quality Act (CEQA) are available for public review.
- Financial commitments to the DWR director are equal to or greater than 75% of the non-state cost share of the project.
- Establishes the Sustainable Groundwater Management Act (SGMA) to provide for long term management of designated groundwater basins.
FISCAL EFFECT: Unknown, but appropriates $7 million from the General Fund.
COMMENTS: Appropriates $7 million from the General Fund to the DWR, to fund, as defined in existing law, the Project.
Author’s Statement: This bill would provide funding for the construction of two permanent pump-back facilities that would support regional and interregional connectivity. The development of water conveyance facilities can help provide much needed flexibility to assist in the movement of water supplies to regions with the greatest need. The existing network of interregional conveyance does not allow for sufficient flexibility in water supply management. This project would help increase water availability and improve water management including enhancing groundwater recharge and banking options.
Background:
- San Joaquin River Restoration Program. The San Joaquin River is the second longest river in California, and historically supported large runs of salmon and other cold-water fish. After Friant Dam was constructed by the U.S. Department of Interior, Bureau of Reclamation (Reclamation), parts of the San Joaquin River went completely dry in most years. Environmental groups brought litigation citing, among other claims, the requirements in California law that the owner of any dam must allow sufficient water to pass through to keep fish in good condition below the dam. In 2006, after 18 years of litigation, a federal court approved a settlement between the federal government, the environmental plaintiffs, and the Friant Water Authority. The San Joaquin River Restoration Program (SJRRP) settlement had two objectives: a river restoration program that would support naturally reproducing populations of Chinook salmon, and a water management goal having the purpose of minimizing water supply impacts to San Joaquin River water users.
The SJRRP settlement primarily required the federal government and the Friant Water Authority to fund the restoration and water management objectives. In 2009, the federal government enacted legislation to fund the settlement. While not a party to the lawsuit, the state formally committed to contribute at least $200 million for multi-benefit projects in the SJRRP. Thus far, the state has allocated about $155 million from various bonds towards the river restoration. According to the DWR the $7 million general fund appropriation in this legislation would be accounted for solely to make water users whole for the water they forego and would not count toward the remaining state obligation for the SJRRP.
- The plan for water management under the SJRRP, the Friant-Kern Canal, and the status of the Project. An investment strategy to guide implementation of the water management objectives in the SJRRP Reclamation was put together in a March 2015 report titled Water Management Goal Investment Strategy Final Report (Final Report). The Final Report identified projects that, in conjunction with other activities, could cost-effectively reduce or avoid water supply impacts to the Friant Contractors. Reclamation, in collaboration with the Friant Contractors, identified, screened, developed, evaluated, and ranked over 500 project concepts to form a list of approximately 60 projects. Of these, 21 projects were further evaluated as ready-to-implement priority projects. Though the report was clear that projects would not necessarily be implemented in the order of their ranking the Project that would be funded through this bill was fourth among the 21 projects evaluated in the Final Report.
The Friant-Kern Canal is a Federal Central Valley Project canal that conveys water from Friant Dam on the San Joaquin River near Fresno, southward to various Friant Contractors along the east side of the San Joaquin Valley, terminating at the Kern River near Bakersfield. The Project would provide benefits to access water banks or other water supplies available via the California Aqueduct during times drought and help provide for the delivery of recirculated restoration flows made available by the SJRRP. The improved operational flexibility to deliver surface water supplies would improve the regions drought resiliency and help with the implementation of SGMA. The 2009 federal legislation appropriated $17 million to conduct feasibility studies for a reverse flow pump back facility similar to, but more expansive than, the Project that is the subject of this bill. The Project is substantially similar to the reverse flow pump-back project described in the Final Report which had an estimated cost of $7.6 million. As of summer 2016 the estimated cost of the Project that is the subject of this bill was $9.3 million with an expected completion time of two-three years. The Federal government has contributed $3.3 million to the Project. Presently the Friant contractors have selected a design and construction firm, and are pursuing a contract for environmental work. The Project has been estimated to convey approximately 15,000-30,000 acre-feet annually and is expected to avoid 2,750 metric tons of carbon emissions over the life of the Project.
Prior and Related Legislation:
AB 935 (Salas) Chapter 601, Statutes of 2016, required the DWR upon appropriation by the Legislature, to fund the Project, not in excess of $7 million.
Supporting Arguments: This project has the potential to convey 30,000 acre feet of water per year from the west side of the San Joaquin Valley to the east side Friant Water Authority. This additional water supply will reduce dependence on groundwater wells and enable local agencies to improve groundwater management and groundwater quality under the SGMA. This will greatly improve the adaptability of water supplies available to growers in the region. This project is a crucial step towards increasing the region’s drought resiliency going forward.
REGISTERED SUPPORT / OPPOSITION:
Support
California Citrus Mutual
California Fresh Fruit Association
Delano-Earlimart Irrigation District
Lower Tule River Irrigation District
Pixley Irrigation District
South Valley Water Association
Southern San Joaquin Municipal Utility District
Sun World International, LLC
48 Individuals
Opposition
None on file
Analysis Prepared by: Ryan Ojakian / W., P., & W. / (916) 319-2096
Discussed in Hearing
Assembly Standing Committee on Appropriations
Assembly Standing Committee on Water, Parks, and Wildlife
Bill Author
Bill Co-Author(s):