Existing law establishes the Monterey County Water Resources Agency as a flood control and water agency within the County of Monterey. Existing law authorizes the agency to award a design-build contract for the combined design and construction of a project to connect Lake San Antonio, located in the County of Monterey, and Lake Nacimiento, located in the County of San Luis Obispo, with an underground tunnel or pipeline for the purpose of maximizing water storage, supply, and groundwater recharge.
This bill would appropriate $25,000,000 $10,000,000 from an unspecified source the General Fund to the Department of Water Resources and would require the department to grant the $10,000,000 to the agency for the purpose of constructing a water conveyance tunnel between Lake Nacimiento and Lake San Antonio and spillway modifications at Lake San Antonio, as specified.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Monterey County Water Resources Agency.
This bill would declare that it is to take effect immediately as an urgency statute.
Existing law establishes the Monterey County Water Resources Agency as a flood control and water agency within the County of Monterey. Existing law authorizes the agency to award a design-build contract for the combined design and construction of a project to connect Lake San Antonio, located in the County of Monterey, and Lake Nacimiento, located in the County of San Luis Obispo, with an underground tunnel or pipeline for the purpose of maximizing water storage, supply, and groundwater recharge.
This bill would appropriate $25,000,000 from an unspecified source to the agency for the purpose of constructing a water conveyance tunnel between Lake Nacimiento and Lake San Antonio and spillway modifications at Lake San Antonio, as specified.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Monterey County Water Resources Agency.
This bill would declare that it is to take effect immediately as an urgency statute.
Existing law establishes the Monterey County Water Resources Agency as a flood control and water agency within the County of Monterey. Existing law authorizes the agency to award a design-build contract for the combined design and construction of a project to connect Lake San Antonio, located in the County of Monterey, and Lake Nacimiento, located in the County of San Luis Obispo, with an underground tunnel or pipeline for the purpose of maximizing water storage, supply, and groundwater recharge.
This bill would require no less than appropriate $25,000,000 from an unspecified source to be allocated, upon appropriation by the Legislature, to the agency for the purpose of constructing a water conveyance tunnel between Lake Nacimiento and Lake San Antonio, Antonio and spillway modifications at Lake San Antonio, as specified.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Monterey County Water Resources Agency.
This bill would declare that it is to take effect immediately as an urgency statute.
Existing law establishes the Monterey County Water Resources Agency as a flood control and water agency within the County of Monterey. Existing law authorizes the agency to award a design-build contract for the combined design and construction of a project to connect Lake San Antonio, located in the County of Monterey, and Lake Nacimiento, located in the County of San Luis Obispo, with an underground tunnel or pipeline for the purpose of maximizing water storage, supply, and groundwater recharge.
This bill would require no less than $25,000,000 from an unspecified source to be allocated, upon appropriation by the Legislature, to the agency for the purpose of constructing a water conveyance tunnel between Lake Nacimiento and Lake San Antonio, as specified.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Monterey County Water Resources Agency.
This bill would declare that it is to take effect immediately as an urgency statute.
The Legislature finds and declares as follows:
(a)Over the past four years, California has grappled with one of the worst ongoing droughts in the states history.
(b)The state is riddled with water supply and water quality challenges posed by the relentless drought and is now facing weather forecasts of one of the most powerful El Nino storms ever recorded.
(c)A major flood event in California has the potential to devastate communities and regional agriculture-based economies and seriously impact the states economy.
(d)In the County of Monterey County alone, agriculture generates eight billion one hundred twenty million dollars ($8,120,000,000) $8,120,000,000 into the local economy and supports more than 53,500 jobs. An additional 20,352 jobs are created as an indirect result of the industry.
(e)The Monterey County Water Resources Agency manages Lake Nacimiento and Lake San Antonio, two reservoirs that supply water for consumption and groundwater recharge and provide flood management, prevention of saltwater intrusion, and recreation in the Salinas Valley.
(f)Lake Nacimientos watershed fills its reservoir nearly three times faster than Lake San Antonios watershed fills its reservoir, often causing water in Lake Nacimiento to exceed safe capacity and overflow from the spillway into the Salinas River, even when Lake San Antonio still has available storage capacity.
(g)The Monterey County Water Resources Agency is planning to improve this situation and maximize the water supply availability and flood control benefits for Zone 2C by doing both of the following:
(1)By constructing a tunnel or pipeline between Lake Nacimiento and Lake San Antonio that has the potential to reduce water overflow events by 60 percent.
(2)By constructing spillway modifications at Lake San Antonio to manage flood control and increase storage by approximately 60,000 acre-feet.
(h)These two projects will mitigate the impact of the drought and improve the economic viability of the Salinas Valley, the environmental sustainability of the region, and agricultural production.
(i)The Lake Nacimiento and Lake San Antonio region scores 40 percent to 50 percent as a disadvantaged community under CalEnviroScreen.
(j)Given the Salinas Valleys economic contribution to the states agricultural economy and the stress the El Nino storms will put on the region, the Lake Nacimiento and Lake San Antonio areas are considered distressed communities and therefore are a priority for state funding.
SEC. 2.Twenty-five million dollars ($25,000,000) Ten million dollars ($10,000,000) from ____ the General Fund is hereby appropriated to the Department of Water Resources, who shall grant the ten million dollars ($10,000,000) to the Monterey County Water Resources Agency for the purpose of constructing, in accordance with the design-build process authorized by Section 11.1 of the Monterey County Water Resources Agency Act (Chapter 1159 of the Statutes of 1990, as amended by Chapter 865 of the Statutes of 2014), both of the following in order to maximize water storage, water supply, flood management, and groundwater recharge at the lakes, Lake Nacimiento and Lake San Antonio, within the Salinas River groundwater basin, and the Salinas Valley:
(a)A water conveyance tunnel between Lake Nacimiento and Lake San Antonio.
(b)Spillway modifications at Lake San Antonio to increase storage by approximately 60,000 acre-feet.
SEC. 3.The Legislature finds and declares that a special law is necessary and that a general law cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the emergency circumstances of the ongoing drought and the benefits these projects involving Lake Nacimiento and Lake San Antonio, managed by the Monterey County Water Resources Agency, will provide to the region.
SEC. 4.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to responsibly store water during Californias prolonged drought, to protect the Salinas Valley from flooding, and to protect water supply, water quality, distressed communities, and urban and rural property and structures during a historic El Nino weather pattern, it is necessary that this act take effect immediately.
The Legislature finds and declares as follows:
(a)Over the past four years, California has grappled with one of the worst ongoing droughts in the states history.
(b)The state is riddled with water supply and water quality challenges posed by the relentless drought and is now facing weather forecasts of one of the most powerful El Nino storms ever recorded.
(c)A major flood event in California has the potential to devastate communities and regional agriculture-based economies and seriously impact the states economy.
(d)In Monterey County alone, agriculture generates eight billion one hundred twenty million dollars ($8,120,000,000) into the local economy and supports more than 76,000 53,500 jobs. An additional 20,352 jobs are created as a direct an indirect result of the industry.
(e)The Monterey County Water Resources Agency manages Lake Nacimiento and Lake San Antonio, two reservoirs that supply water for consumption and groundwater recharge and provide flood control, management, prevention of salt water saltwater intrusion, and recreation in the Salinas Valley.
(f)Lake Nacimientos watershed fills its reservoir nearly three times faster than Lake San Antonios watershed fills its reservoir, often causing water in Lake Nacimiento to exceed safe capacity and overflow from the spillway to the ocean, into the Salinas River, even when Lake San Antonio still has available storage capacity.
(g)The Monterey County Water Resources Agency is planning to correct these wasteful and potentially harmful consequences by constructing both of the following: improve this situation and maximize the water supply availability and flood control benefits for Zone 2C by doing both of the following:
(1)A By constructing a tunnel or pipeline between Lake Nacimiento and Lake San Antonio that has the potential to reduce water overflow events by 60 percent.
(2)Spillway By constructing spillway modifications at Lake San Antonio to manage flood control and increase storage by approximately 60,000 acre feet. acre-feet.
(h)These two projects will mitigate the impact of the drought and improve the economic viability of the Salinas Valley, the environmental sustainability of the region, and agricultural production.
(i)The Lake Nacimiento and Lake San Antonio region scores 40 percent to 50 percent as a disadvantaged community under CalEnviroScreen.
(j)Given the Salinas Valleys economic contribution to the states agricultural economy and the stress the El Nino storms will put on the region, the Lake Nacimiento and Lake San Antonio areas are considered distressed communities and therefore are a priority for state funding.
SEC. 2.Twenty-five million dollars ($25,000,000) from ____ is hereby appropriated to the Monterey County Water Resources Agency for the purpose of constructing, in accordance with the design-build process authorized by Section 11.1 of the Monterey County Water Resources Agency Act (Chapter 1159 of the Statutes of 1990, as amended by Chapter 865 of the Statutes of 2014), both of the following in order to maximize water storage, water supply, flood management, and groundwater recharge at the lakes, within the Salinas River groundwater basin, and the Salinas Valley:
(a)A water conveyance tunnel between Lake Nacimiento and Lake San Antonio within zone 2c. Antonio.
(b)Spillway modifications at Lake San Antonio to increase storage by approximately 60,000 acre feet. acre-feet.
SEC. 3.The Legislature finds and declares that a special law is necessary and that a general law cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the emergency circumstances of the ongoing drought and the benefits these projects involving Lake Nacimiento and Lake San Antonio Antonio, managed by the Monterey County Water Resources Agency Agency, will provide to the region.
SEC. 4.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to responsibly store water during Californias prolonged drought, to protect the Salinas Valley from flooding, and to protect water supply, water quality, distressed communities, and urban and rural property and structures during a historic El Nino weather pattern, it is necessary that this act take effect immediately.
The Legislature finds and declares as follows:
(a)Over the past four years, California has grappled with one of the worst ongoing droughts in the states history.
(b)The state is riddled with water supply and water quality challenges posed by the relentless drought and is now facing weather forecasts of one of the most powerful El Nino storms ever recorded.
(c)A major flood event in California has the potential to devastate communities and regional agriculture-based economies and seriously impact the states economy.
(d)In Monterey County alone, agriculture generates eight billion one hundred twenty million dollars ($8,120,000,000) into the local economy and supports more than 76,000 jobs. An additional 20,352 jobs are created as a direct result of the industry.
(b)
(e)The Monterey County Water Resources Agency manages Lake Nacimiento and Lake San Antonio, two reservoirs that provide water supply, supply water for consumption and groundwater recharge and provide flood control, prevention of salt water intrusion, and recreation in the Salinas Valley.
(c)
(f)Lake Nacimientos watershed fills the Lake Nacimiento its reservoir nearly three times faster than Lake San Antonios watershed fills that reservoir. The Monterey County Water Resources Agency often releases water from Lake Nacimiento because it reaches its capacity, its reservoir, often causing water in Lake Nacimiento to exceed capacity and overflow from the spillway to the ocean, even when Lake San Antonio still has excess storage available. available storage capacity.
(d)
(g)The Monterey County Water Resources Agency is planning to build a tunnel or pipeline between Lake Nacimiento and Lake San Antonio to redirect water from Lake Nacimiento that would otherwise be released out to sea and use it to fill excess capacity in Lake San Antonio. correct these wasteful and potentially harmful consequences by constructing both of the following:
(1)A tunnel or pipeline between Lake Nacimiento and Lake San Antonio that has the potential to reduce water overflow events by 60 percent.
(2)Spillway modifications at Lake San Antonio to increase storage by approximately 60,000 acre feet.
(e)The interlake tunnel project
(h)These two projects will mitigate the impact of the drought and improve the economic viability of the Salinas Valley, the environmental sustainability of the region, and agricultural production.
(f)
(i)The Lake Nacimiento and Lake San Antonio region scores 40 percent to 50 percent as a disadvantaged community under CalEnviroScreen.
(g)The state is riddled with water supply and water quality challenges posed by the relentless drought and is now facing weather forecasts of one of the most powerful El Nino storms ever recorded.
(h)A major flood event in California has the potential to devastate communities, regional agriculture-based economies, and seriously impact the states economy.
(i)In Monterey County alone, agriculture generates eight billion one hundred twenty million dollars ($8,120,000,000) into the local economy and supports more than 76,000 jobs. An additional 20,352 jobs are created as a direct result of the prosperous industry. Flooding of our agricultural lands could put all of that into jeopardy.
(j)Given the Salinas Valleys economic contribution to the states agricultural economy and the stress the El Nino storms will put on the region, the Lake Nacimiento and Lake San Antonio areas are considered distressed communities and therefore are a priority for state funding.
SEC. 2.Upon appropriation by the Legislature, no less than twenty-five Twenty-five million dollars ($25,000,000) from ____ shall be allocated is hereby appropriated to the Monterey County Water Resources Agency for the purpose of constructing a water conveyance tunnel, constructing, in accordance with the design-build process authorized by Section 11.1 of the Monterey County Water Resources Agency Act (Chapter 1159 of the Statutes of 1990, as amended by Chapter 865 of the Statutes of 2014), between Lake Nacimiento and Lake San Antonio within zone 2c both of the following in order to maximize water storage, water supply, and groundwater recharge at the lakes, within the Salinas River groundwater basin, and the Salinas Valley. Valley:
(a)A water conveyance tunnel between Lake Nacimiento and Lake San Antonio within zone 2c.
(b)Spillway modifications at Lake San Antonio to increase storage by approximately 60,000 acre feet.
SEC. 3.The Legislature finds and declares that a special law is necessary and that a general law cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the emergency circumstances of the ongoing drought and the benefits this project between these projects involving Lake Nacimiento and Lake San Antonio managed by the Monterey County Water Resources Agency will provide to the region.
SEC. 4.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to responsibly store water during Californias prolonged drought and drought, to protect the Salinas Valley from flooding flooding, and to protect water supply, water quality, distressed communities, and urban and rural property and structures during a historic El Nino weather pattern, it is necessary that this act take effect immediately.
The Legislature finds and declares as follows:
(a)Over the past four years, California has grappled with one of the worst ongoing droughts in the states history.
(b)The Monterey County Water Resources Agency manages Lake Nacimiento and Lake San Antonio, two reservoirs that provide water supply, flood control, and recreation in the Salinas Valley.
(c)Lake Nacimientos watershed fills the Lake Nacimiento reservoir nearly three times faster than Lake San Antonios watershed fills that reservoir. The Monterey County Water Resources Agency often releases water from Lake Nacimiento because it reaches its capacity, even when Lake San Antonio still has excess storage available.
(d)The Monterey County Water Resources Agency is planning to build a tunnel or pipeline between Lake Nacimiento and Lake San Antonio to redirect water from Lake Nacimiento that would otherwise be released out to sea and use it to fill excess capacity in Lake San Antonio.
(e)The interlake tunnel project will mitigate the impact of the drought and improve the economic viability of the Salinas Valley, the environmental sustainability of the region, and agricultural production.
(f)The Lake Nacimiento and Lake San Antonio region scores 40 percent to 50 percent as a disadvantaged community under CalEnviroScreen.
(g)The state is riddled with water supply and water quality challenges posed by the relentless drought and is now facing weather forecasts of one of the most powerful El Nino storms ever recorded.
(h)A major flood event in California has the potential to devastate communities, regional agriculture-based economies, and seriously impact the states economy.
(i)In Monterey County alone, agriculture generates eight billion one hundred twenty million dollars ($8,120,000,000) into the local economy and supports more than 76,000 jobs. An additional 20,352 jobs are created as a direct result of the prosperous industry. Flooding of our agricultural lands could put all of that into jeopardy.
(j)Given the Salinas Valleys economic contribution to the states agricultural economy and the stress the El Nino storms will put on the region, the Lake Nacimiento and Lake San Antonio areas are considered distressed communities and therefore are a priority for state funding.
SEC. 2.Upon appropriation by the Legislature, no less than twenty-five million dollars ($25,000,000) from ____ shall be allocated to the Monterey County Water Resources Agency for the purpose of constructing a water conveyance tunnel, in accordance with the design-build process authorized by Section 11.1 of the Monterey County Water Resources Agency Act (Chapter 1159 of the Statutes of 1990, as amended by Chapter 865 of the Statutes of 2014), between Lake Nacimiento and Lake San Antonio within zone 2c in order to maximize water storage, water supply, and groundwater recharge at the lakes, within the Salinas River groundwater basin, and the Salinas Valley.
SEC. 3.The Legislature finds and declares that a special law is necessary and that a general law cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the emergency circumstances of the ongoing drought and the benefits this project between Lake Nacimiento and Lake San Antonio managed by the Monterey County Water Resources Agency will provide to the region.
SEC. 4.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to responsibly store water during Californias prolonged drought and to protect the Salinas Valley from flooding during a historic El Nino weather pattern, it is necessary that this act take effect immediately.
|
Date
|
Status
|
|---|---|
| Jun 9, 2016 | Referred to Com. on B. & F.R. |
| Jun 6, 2016 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Jun 2, 2016 | Read third time. Urgency clause adopted. Passed. Ordered to the Senate. (Ayes 70. Noes 2. Page 5241.). |
| Jun 2, 2016 | Read third time. Urgency clause adopted. Passed. Ordered to the Senate. (Ayes 70. Noes 2.). |
| Jun 2, 2016 | Read third time. Urgency clause adopted. Passed. Ordered to the Senate. |
| Jun 1, 2016 | Read second time. Ordered to third reading. |
| May 31, 2016 | Read second time and amended. Ordered returned to second reading. |
| May 27, 2016 | From committee: Amend, and do pass as amended. (Ayes 16. Noes 1.) (May 27). |
| Apr 27, 2016 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| Apr 13, 2016 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 12. Noes 1.) (April 12). Re-referred to Com. on APPR. |
| Apr 5, 2016 | Re-referred to Com. on W., P., & W. |
| Apr 4, 2016 | From committee chair, with author's amendments: Amend, and re-refer to Com. on W., P., & W. Read second time and amended. |
| Mar 17, 2016 | In committee: Set, first hearing. Hearing canceled at the request of author. |
| Feb 9, 2016 | Re-referred to Com. on W., P., & W. |
| Feb 8, 2016 | From committee chair, with author's amendments: Amend, and re-refer to Com. on W., P., & W. Read second time and amended. |
| Feb 1, 2016 | Referred to Com. on W., P., & W. |
| Jan 7, 2016 | From printer. May be heard in committee February 6. |
| Jan 6, 2016 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Jun 2, 2016 | AB 1585 ALEJO Third Reading Urgency | Assembly Floor |
Passed |
|
| May 27, 2016 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 12, 2016 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Water, Parks, and Wildlife |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
ASSEMBLY THIRD READING
ATR Bill Id:
Author:(Alejo)
As Amended Ver:May 31, 2016
2/3 vote. Urgency
Committee | Votes | Ayes | Noes |
Water | 12-1 | Levine, Bigelow, Dodd, Eggman, Cristina Garcia, Eduardo Garcia, Gomez, Lopez, Mathis, Olsen, Salas, Williams | Harper |
Appropriations | 16-1 | Gonzalez, Bigelow, Bloom, Bonilla, Bonta, Calderon, Chang, Daly, Eggman, Eduardo Garcia, Roger Hernández, Holden, Quirk, Santiago, Weber, Wood | Obernolte |
SUMMARY: Appropriates $10 million from the General Fund (GF) to the Monterey County Water Resources Agency (MCWRA) for construction of a water conveyance tunnel between Lake Nacimiento and Lake San Antonio in Monterey and San Luis Obispo Counties. Specifically, this bill:
- Appropriates $10 million from the GF to the MCWRA for the purpose of constructing, in accordance with a specified design-build process, a water conveyance tunnel between Lake Nacimiento and Lake San Antonio, and spillway modifications at Lake San Antonio to increase storage by 60,000 acre feet.
- States legislative findings and declarations regarding the drought, water supply, water quality, and flood risk challenges facing the state, and specifically the Monterey County region. States further legislative findings and declarations regarding capacity and overflow challenges experienced at Lake Nacimiento and Lake San Antonio, two reservoirs that provide water supply, groundwater recharge, flood control, prevention of saltwater intrusion, and recreational benefits to the Salinas Valley, and plans to construct a tunnel or pipeline between the two reservoirs to mitigate these challenges. Finally, makes legislative findings regarding the area's status as a disadvantaged community, and states that the area is a distressed community that is a priority for state funding.
- States legislative findings and declarations that a special law is necessary to address the emergency circumstances of the drought and the benefits these projects will provide to the region.
- Includes an urgency clause stating that it is necessary that this statute take effect immediately in order to responsibly store water during California's prolonged drought; to protect the Salinas Valley from flooding; and to protect water supply, water quality, distressed communities, and urban and rural property and structures during the El Niño.
EXISTING LAW:
- The Water Quality, Supply, and Infrastructure Improvement Act of 2014 (Proposition 1) makes available $7.45 billion in general obligation bond funds for various state water needs, including $810 million for integrated regional water management projects, $43 million of which is allocated to the central coast region of the state. Proposition 1 also makes available $2.7 billion for water storage projects. These funds are continuously appropriated to the California Water Commission, which is tasked with selecting the projects to be funded through a competitive public process, as specified.
- Provides that, subject to regional priorities, eligible projects for the integrated regional water management funds made available in Proposition 1 include, among other things, local and regional surface and underground water storage projects, and regional water conveyance facilities that improve integration of separate water systems.
- Provides that the Proposition 1 integrated regional water management funds shall be for expenditures on, and competitive grants and loans to, projects in an integrated regional water management plan. Prohibits the Legislature from appropriating funding made available by Proposition 1 to a specific project.
FISCAL EFFECT: According to the Assembly Appropriations Committee, appropriates $25 million from an unspecified state account to the MCWRA .
COMMENTS: This bill would appropriate $10 million for the purpose of constructing, in accordance with a specified design-build process, a water conveyance tunnel between Lake Nacimiento and Lake San Antonio, and for spillway modifications at Lake San Antonio that would increase storage capacity by 60,000 acre feet.
The author notes that in the midst of the worst drought California has ever experienced, increasing water capture capacity in the Salinas Valley watershed is important regionally and statewide. Any water not captured through the reservoirs at Lake San Antonio and Lake Nacimiento in Monterey and San Luis Obispo counties floods nearby areas. The author emphasizes that much of the damage from past floods in the area has impacted the most economically disadvantaged parts of the Salinas Valley. In addition, the inability to capture more water impacts agriculture which is a major source of jobs and economic activity in the area. An Interlake Tunnel (Tunnel) would allow for excess water from Lake Nacimiento to flow to Lake San Antonio in order to maximize the capture of water in the Salinas Valley watershed. The additional water would help protect agricultural jobs in the Valley. The Tunnel would also increase water quality by reducing the flooding of agricultural fields, and reducing the intrusion of seawater. The Tunnel will also reduce potential flood damage in the region by reducing flood spillage by an average of 11,857 acre feet per year.
MCWRA is responsible for managing, protecting, and enhancing water supply and water quality, as well as providing flood protection, in the County of Monterey. MCWRA is a proponent of the Interlake Tunnel and Spillway Modification Project which this bill seeks to fund. The project would include construction of a 12,000 foot long gravity flow water conveyance tunnel connecting Lake Nacimiento and Lake San Antonio reservoirs. The Lake Nacimiento reservoir fills three times faster than the Lake San Antonio reservoir resulting in unused storage in Lake San Antonio when Lake Nacimiento is at capacity and releasing flood spills. In addition to the Interlake Tunnel, the proposed project includes spillway modifications that would increase storage capacity in Lake San Antonio reservoir. A preliminary report prepared by MCWRA in November 2015 concludes that the project would provide potential ecological benefits including flood management, groundwater recharge, surface and groundwater quality, and benefits to biological resources. The report indicates that these potential benefits and other effects of the project will be further identified and analyzed in an Environmental Impact Report to be prepared in compliance with the California Environmental Quality Act (CEQA) which has not yet been completed. The project has been under consideration since the late 1970s and was included in the 2013 Greater Monterey County Integrated Regional Water Management Plan. MCWRA indicates that in 2014 a group of Salinas Valley growers revitalized the urgency for the Tunnel project due to heightened awareness from the multi-year drought. The MCWRA report indicates that constructing the Tunnel would add approximately 20,000 acre feet of net water storage. Increasing the capacity of the Lake San Antonio reservoir would also increase the storage capacity at that reservoir by 60,000 acre feet. This would provide additional storage for flood control and conservation releases. According to MCWRA, the additional storage and controlled releases resulting from the project would benefit the watershed by reducing flood damage and flood safety concerns, increasing potential for groundwater recharge, improving water quality by reducing sediments and pesticide residues from flooded agricultural fields, reducing salinity from sea water intrusion, and improving instream flows benefitting biological habitat and wildlife. Reducing reservoir spills would also reduce the likelihood of White Bass entering the Salinas River and the loss of juvenile Steelhead fish to predation.
AB 155 (Alejo), Chapter 865, Statutes of 2014, authorized MCWRA to award a design-build contract for the combined design and construction of a project to connect Lake San Antonio, and Lake Nacimiento with an underground tunnel or pipeline for the purpose of maximizing water storage, supply, and groundwater recharge.
The project that would be funded through this bill would appear to be an eligible project to compete for funding under at least two different categories of funding made available for water management projects in Proposition 1. As stated above, Proposition 1 made available $810 million for projects that are included in integrated regional water management plans. Of this amount, $43 million is specifically allocated to the central coast region, of which the Salinas Valley is a part. Eligible projects include local and regional surface and underground water storage projects, regional water conveyance facilities that improve integration of separate water systems, and watershed protection, restoration, and management projects that improve water supply reliability. Eligible projects also include those that provide multiple benefits such as water quality, water supply, flood control, or open space. The bond requires that projects that achieve multiple benefits receive special consideration. At least 10% of the funds authorized by this chapter of the bond must also be allocated to projects that directly benefit disadvantaged communities. A 50% cost share from non-state sources is required, but this requirement can be waived or reduced for projects that directly benefit a disadvantaged community or an economically distressed area. The project that this bill seeks to fund would thus appear to be well positioned to receive favorable consideration in a competitive process for a share of these funds.
The project would also appear to meet the eligibility criteria to compete for a share of the funding made available through Proposition 1 for water storage projects being administered by the California Water Commission. The California Water Commission is currently soliciting concept proposals from interested parties for proposed storage projects.
The Legislature in drafting Proposition 1 relied on several core principles; one being the desire to avoid individual project earmarks and instead rely on competitive processes for allocating funding for projects statewide and regionally. This principle of avoiding individual project earmarks is a principle that applies beyond the context of the bond, and points more broadly to the policy goal of having individual projects evaluated through competitive processes that examine in detail the merits of those projects in the context of other statewide and regional goals.
This bill does not specify whether the MCWRA would be required to provide a local cost share as a match to the state appropriation for this project. The author's office indicates that the local region intends for over two-thirds of the anticipated $6 million in costs for the project to be financed by local farmers and rate payers through a Proposition 218 process, however, this bill is currently silent as to whether a local match would be a condition of the state appropriation.
Supporters emphasize this bill will help ensure that a critically needed water transfer project is able to be constructed, and point to the enactment of AB 155, which authorized the MCWRA to construct a water transfer pipeline or tunnel between the two lakes utilizing the design-build construction method in conjunction with a Project Labor Agreement (PLA). PLAs are agreements that require award of government contracts for public construction projects to unionized firms.
Opponents assert this bill would pressure the county to use a design-build approach to construction of the pipeline or tunnel connecting the two reservoirs, and a PLA for the project. The opponents are self-described Merit Shop employer associations who indicate they follow a way of doing business that rewards employees based on performance, and support award of contracts based on safety, quality and value, regardless of labor affiliation.
Analysis Prepared by: Diane Colborn / W., P., & W. / (916) 319-2096 FN: 0003304
Date of Hearing: April 27, 2016
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
ABPCA Bill Id:AB 1585
Author:(Alejo) – As Amended Ver:April 4, 2016
Policy Committee: | Water, Parks and Wildlife | Vote: | 12 - 1 |
Urgency: Yes State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill appropriates $25 million from an unspecified fund to the Monterey County Water Resources Agency (Agency) for construction of a water conveyance tunnel between Lake Nacimiento and Lake San Antonio in Monterey and San Luis Obispo Counties.
FISCAL EFFECT:
Appropriates $25 million from an unspecified state account to the Agency.
COMMENTS:
- Purpose. According to the author, increasing water capture capacity in the Salinas Valley watershed is important regionally and statewide. This bill partially funds an Interlake Tunnel (Tunnel) to allow excess water from Lake Nacimiento to flow to Lake San Antonio in order to maximize the capture of water in the Salinas Valley watershed.
The author's office indicates that the local region intends for over two-thirds of the anticipated costs for the project to be financed by local farmers and rate payers through a Proposition 218 process.
- Background. The Agency is a special act district created as a flood control and water agency in Monterey County. The Agency manages Lake Nacimiento and Lake San Antonio, two reservoirs that provide flood control, water supply and recreation in the Salinas Valley.
Lake Nacimiento’s watershed fills the Lake Nacimiento reservoir nearly three times faster than Lake San Antonio's watershed fills its reservoir. The Agency often releases water from Lake Nacimiento because it reaches its capacity, even when Lake San Antonio still has excess storage available.
Agency officials have proposed building a tunnel or pipeline between Lake Nacimiento and Lake San Antonio to redirect water from Lake Nacimiento that would otherwise be released out to sea and, instead, use it to fill excess capacity in Lake San Antonio.
- Prior and Related Legislation: AB 155 (Alejo), Chapter 865, Statutes of 2014, authorized the Agency to award a design-build contract for the combined design and construction of a project to connect Lake San Antonio, located in the County of Monterey, and Lake
Nacimiento, located in the County of San Luis Obispo, with an underground tunnel or pipeline for the purpose of maximizing water storage, supply, and groundwater recharge.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: April 12, 2016
ASSEMBLY COMMITTEE ON WATER, PARKS, AND WILDLIFE
Marc Levine, Chair
ABPCA Bill Id:AB 1585 (
Author:Alejo) – As Amended Ver:April 4, 2016
SUBJECT: Monterey County Water Resources Agency: Lake Nacimiento and Lake San Antonio
SUMMARY: Appropriates $25 million to the Monterey County Water Resources Agency (MCWRA) for construction of a water conveyance tunnel between Lake Nacimiento and Lake San Antonio in Monterey and San Luis Obispo Counties. Specifically, this bill:
- Appropriates $25 million from an unidentified state fund source to the MCWRA for the purpose of constructing, in accordance with a specified design-build process, a water conveyance tunnel between Lake Nacimiento and Lake San Antonio, and spillway modifications at Lake San Antonio to increase storage by 60,000 acre feet.
- States legislative findings and declarations regarding the drought, water supply, water quality, and flood risk challenges facing the state, and specifically the Monterey County region. States further legislative findings and declarations regarding capacity and overflow challenges experienced at Lake Nacimiento and Lake San Antonio, two reservoirs that provide water supply, groundwater recharge, flood control, prevention of saltwater intrusion, and recreational benefits to the Salinas Valley, and plans to construct a tunnel or pipeline between the two reservoirs to mitigate these challenges. Finally, makes legislative findings regarding the area's status as a disadvantaged community, and states that the area is a distressed community that is a priority for state funding.
- States legislative findings and declarations that a special law is necessary to address the emergency circumstances of the drought and the benefits these projects will provide to the region.
- Includes an urgency clause stating that it is necessary that this statute take effect immediately in order to responsibly store water during California's prolonged drought; to protect the Salinas Valley from flooding; and to protect water supply, water quality, distressed communities, and urban and rural property and structures during the El Nino.
EXISTING LAW:
- The Water Quality, Supply, and Infrastructure Improvement Act of 2014 (Proposition 1) makes available $7.45 billion in general obligation bond funds for various state water needs, including $810 million for integrated regional water management projects, $43 million of which is allocated to the central coast region of the state. Proposition 1 also makes available $2.7 billion for water storage projects. These funds are continuously appropriated to the California Water Commission, which is tasked with selecting the projects to be funded through a competitive public process, as specified.
- Provides that, subject to regional priorities, eligible projects for the integrated regional water management funds made available in Proposition 1 include, among other things, local and regional surface and underground water storage projects, and regional water conveyance facilities that improve integration of separate water systems.
- Provides that the integrated regional water management funds shall be for expenditures on, and competitive grants and loans to, projects in an integrated regional water management plan. Expressly prohibits the Legislature from appropriating funding made available by Proposition 1 to a specific project.
FISCAL EFFECT: Appropriates $25 million from an unidentified state fund for a specific project in Monterey County.
COMMENTS: This bill would appropriate $25 million from an as yet unidentified funding source for the purpose of constructing, in accordance with a specified design-build process, a water conveyance tunnel between Lake Nacimiento and Lake San Antonio, and for spillway modifications at Lake San Antonio that would increase storage capacity by 60,000 acre feet.
- Author's Statement: The author notes that in the midst of the worst drought California has ever experienced, increasing water capture capacity in the Salinas Valley watershed is important regionally and statewide. Any water not captured through the reservoirs at Lake San Antonio and Lake Nacimiento in Monterey and San Luis Obispo counties simply floods nearby areas. The author emphasizes that much of the damage from past floods in the area has impacted the most economically disadvantaged parts of the Salinas Valley. In addition, the inability to capture more water impacts agriculture which is a major source of jobs and economic activity in the area. An Interlake Tunnel (Tunnel) would allow for excess water from Lake Nacimiento to flow to Lake San Antonio in order to maximize the capture of water in the Salinas Valley watershed. The additional water would help protect agricultural jobs in the Valley. The Tunnel would also increase water quality by reducing the flooding of agricultural fields, and reducing the intrusion of seawater. The Tunnel will also reduce potential flood damage in the region by reducing flood spillage by an average of 11,857 acre feet per year.
- Background: The MCWRA is responsible for managing, protecting, and enhancing water supply and water quality, as well as providing flood protection, in the County of Monterey. MCWRA is a proponent of the Interlake Tunnel and Spillway Modification Project which this bill seeks to fund. The project would include construction of a 12,000 foot long gravity flow water conveyance tunnel connecting Lake Nacimiento and Lake San Antonio reservoirs. The Lake Nacimiento reservoir fills three times faster than the Lake San Antonio reservoir resulting in unused storage in Lake San Antonio when Lake Nacimiento is at capacity and releasing flood spills. In addition to the Interlake Tunnel, the proposed project includes spillway modifications that would increase storage capacity in Lake San Antonio reservoir. A preliminary report prepared by the MCWRA in November 2015 concludes that the project would provide potential ecological benefits including flood management, groundwater recharge, surface/groundwater quality, and benefits to biological resources. The report indicates that these potential benefits and other effects of the project will be further identified and analyzed in an Environmental Impact Report to be prepared in compliance with the California Environmental Quality Act (CEQA) which has not yet been completed. The project has been under consideration since the late 1970s and was included in the 2013 Greater Monterey County Integrated Regional Water Management Plan. The MCWRA indicates that in 2014 a group of Salinas Valley growers revitalized the urgency for the Tunnel project due to heightened awareness from the multi-year drought. The MCWRA report indicates that constructing the Tunnel would add approximately 20,000 acre feet of net water storage. Increasing the capacity of the Lake San Antonio reservoir would also increase the storage capacity at that reservoir by 60,000 acre feet. This would provide additional storage for flood control and conservation releases. According to the MCWRA, the additional storage and controlled releases resulting from the project would benefit the watershed by reducing flood damage and flood safety concerns, increasing potential for groundwater recharge, improving water quality by reducing sediments and pesticide residues from flooded agricultural fields, reducing salinity from sea water intrusion, and improving instream flows benefitting biological habitat and wildlife. Reducing reservoir spills would also reduce the likelihood of White Bass entering the Salinas River and the loss of juvenile Steelhead to predation.
- Prior and Related Legislation: AB 155 (Alejo), Chapter 865, Statutes of 2014, authorized the MCWRA to award a design-build contract for the combined design and construction of a project to connect Lake San Antonio, located in the County of Monterey, and Lake Nacimiento, located in the County of San Luis Obispo, with an underground tunnel or pipeline for the purpose of maximizing water storage, supply, and groundwater recharge.
- Issues for Consideration:
- Project Appears Eligible to Apply for Proposition 1 funding through competitive processes: The project that would be funded through this bill would appear to be an eligible project to compete for funding under at least two, if not three, different categories of funding made available for water management projects in Proposition 1. As stated above under the existing law portion of this analysis, Proposition 1 made available $810 million for projects that are included in integrated regional water management plans. $43 million of this amount is specifically allocated to the central coast region, of which the Salinas Valley is a part. Eligible projects include local and regional surface and underground water storage projects, regional water conveyance facilities that improve integration of separate water systems, and watershed protection, restoration, and management projects that improve water supply reliability. Eligible projects also include those that provide multiple benefits such as water quality, water supply, flood control, or open space. The bond requires that projects that achieve multiple benefits receive special consideration. At least 10% of the funds authorized by this chapter of the bond must also be allocated to projects that directly benefit disadvantaged communities. A 50% cost share from non-state sources is required, but this requirement can be waived or reduced for projects that directly benefit a disadvantaged community or an economically distressed area. The project that this bill seeks to fund would thus appear to be well positioned to receive favorable consideration in a competitive process for a share of these funds.
The project would also appear to meet the eligibility criteria to compete for a share of the funding made available through Proposition 1 for water storage projects being administered by the California Water Commission. The Water Commission is currently soliciting concept proposals from interested parties for proposed storage projects. Finally, the project may be eligible for funding from the flood protection bond funds made available under both Proposition 1 and Proposition 1E.
The Legislature in drafting Proposition 1 relied on several core principles; one being the desire to avoid individual project earmarks and instead rely on competitive processes for allocating funding for projects statewide and regionally. This principle of avoiding individual project earmarks is a principle that applies beyond the context of the bond, and points more broadly to the policy goal of having individual projects evaluated through competitive processes that examine in detail the merits of those projects in the context of other statewide and regional goals. - Budget Appropriations v Policy bill: While the appropriation of funding through a policy bill is not unprecedented, the normal and preferred process for appropriation of state funding is through the budget process rather than through a policy bill.
- Local Cost Share: This bill does not specify whether the MCWRA would be required to provide a local cost share as a match to the state appropriation for this project. While this bill does not currently identify the fund source that would be used, it should be noted that Proposition 1 requires at least a 50% non-state cost share for integrated regional water management projects funded with bond funds. That local cost share can be waived or reduced for disadvantaged or economically distressed communities. The author's office indicates that the local region intends for over two-thirds of the anticipated $68 million in costs for the project to be financed by local farmers and rate payers through a Proposition 218 process, however, this bill is currently silent as to whether a local match would be a condition of the state appropriation.
- Unspecified Fund Source: This bill as currently drafted does not identify a fund source for the $25 million appropriation. As explained above, while MCWRA is eligible to apply for available Proposition 1 funding through the competitive processes established for allocation of those funds, the Legislature may not appropriate Proposition 1 funding for specific projects. Some individual components of this project may be eligible for funding from other fund sources. For example, the project may require fish screens that might be eligible for funding from fisheries restoration grant funds, or from other prior bond funds such as Proposition 40, to the extent there are any unencumbered funds remaining from that bond. The project is in the coastal zone, so it is also possible that it might be eligible to apply to the State Coastal Conservancy for funding for some of the restoration components of the project. The author has also indicated that there may be some flood benefits to the project so it is possible that components of the project may be eligible for funding from unencumbered Proposition 1E flood bond funds that were previously appropriated by the Legislature, though the entire project would not likely qualify for those funds. In summary, while there may be other state fund sources that might be available for different components of this project, the only source of funds that has been identified thus far as potentially available for the project as a whole is the State General Fund.
- Project Appears Eligible to Apply for Proposition 1 funding through competitive processes: The project that would be funded through this bill would appear to be an eligible project to compete for funding under at least two, if not three, different categories of funding made available for water management projects in Proposition 1. As stated above under the existing law portion of this analysis, Proposition 1 made available $810 million for projects that are included in integrated regional water management plans. $43 million of this amount is specifically allocated to the central coast region, of which the Salinas Valley is a part. Eligible projects include local and regional surface and underground water storage projects, regional water conveyance facilities that improve integration of separate water systems, and watershed protection, restoration, and management projects that improve water supply reliability. Eligible projects also include those that provide multiple benefits such as water quality, water supply, flood control, or open space. The bond requires that projects that achieve multiple benefits receive special consideration. At least 10% of the funds authorized by this chapter of the bond must also be allocated to projects that directly benefit disadvantaged communities. A 50% cost share from non-state sources is required, but this requirement can be waived or reduced for projects that directly benefit a disadvantaged community or an economically distressed area. The project that this bill seeks to fund would thus appear to be well positioned to receive favorable consideration in a competitive process for a share of these funds.
- Supporting Arguments: Supporters emphasize this bill will help ensure that a critically needed water transfer project is able to be constructed, and point to the enactment of AB 155 (Alejo) in 2014, which authorized the MCWRA to construct a water transfer pipeline or tunnel between the two lakes utilizing the design-build construction method in conjunction with a Project Labor Agreement (PLA). PLAs are agreements that require award of government contracts for public construction projects to unionized firms.
- Opposing Arguments: Opponents assert this bill would pressure the county to use a design-build approach to construction of the pipeline or tunnel connecting the two reservoirs, and a PLA for the project. The opponents are self-described Merit Shop employer associations who indicate they follow a way of doing business that rewards employees based on performance, and support award of contracts based on safety, quality and value, regardless of labor affiliation.
REGISTERED SUPPORT / OPPOSITION:
Support
State Building and Construction Trades Council of California
Opposition
Air Conditioning Trade Association
Associated Builders and Contractors, San Diego Chapter
Plumbing-Heating-Cooling Contractors Association of California
Western Electrical Contractors Association
Analysis Prepared by: Diane Colborn / W., P., & W. / (916) 319-2096
Discussed in Hearing
View Older HearingsBill Author
Bill Co-Author(s):