AB 2242: Urban water management planning.
- Session Year: 2017-2018
- House: Assembly
- Latest Version Date: 2018-03-15
Existing law, the Urban Water Management Planning Act, requires every public and private urban water supplier that directly or indirectly provides water for municipal purposes to prepare and adopt an urban water management plan and to update its plan once every 5 years on or before December 31 in years ending in 5 and zero, except as specified. Existing law requires an urban water management plan, among other things, to describe the reliability of the water supply and vulnerability to seasonal or climatic shortage, to the extent practicable, and provide data for average, single-dry, and multiple-dry water years. Existing law requires that an urban water management plan provides an urban water shortage contingency analysis that includes, among other things, an estimate of the minimum water supply available during each of the following 3 water years based on the driest 3-year historic sequence for the agencys water supply.
This bill would require an urban water supplier to include in its urban water management plan an assessment of the reliability of its water service, as specified, to its customers during normal, dry, and multiple dry years, including a repeat of the 5 consecutive historic driest years the urban water supplier has experienced.
Existing law declares that certain provisions relating to urban water management planning are intended to provide assistance to water agencies in carrying out their long-term resource planning responsibilities to ensure adequate water supplies to meet existing and future demands for water. Existing law makes related legislative findings and declarations.This bill would make a nonsubstantive change in those findings and declarations.Existing law declares that certain provisions relating to urban water management planning are intended to provide assistance to water agencies in carrying out their long-term resource planning responsibilities to ensure adequate water supplies to meet existing and future demands for water. Existing law makes related legislative findings and declarations.
This bill would make a nonsubstantive change in those findings and declarations.
(a)In addition to the requirements of Section 10631, an urban water supplier shall include in its urban water management plan an assessment of the reliability of its water service to its customers during normal, dry, and multiple dry years, including a repeat of the five consecutive historic driest years the urban water supplier has experienced.
(b)As part of an assessment of the reliability of water service described in subdivision (a), an urban water supplier shall consider the reliability of its water service given the combination of supplies available to it, possible supply augmentation measures it is able to take, and the demand management measures it would likely implement in those scenarios.
SECTION 1.Section 10610.2 of the Water Code is amended to read:10610.2.(a)The Legislature finds and declares all of the following:(1)The waters of the state are a limited and renewable resource subject to ever-increasing demands.(2)The conservation and efficient use of urban water supplies are of statewide concern; however, the planning for that use and the implementation of those plans can best be accomplished at the local level.(3)A long-term, reliable supply of water is essential to protect the productivity of Californias businesses and economic climate.(4)As part of its long-range planning activities, every urban water supplier should make every effort to ensure the appropriate level of reliability in its water service sufficient to meet the needs of its various categories of customers during normal, dry, and multiple dry water years.(5)Public health issues have been raised over a number of contaminants that have been identified in some local and imported water supplies.(6)Implementing effective water management strategies, including groundwater storage projects and recycled water projects, may require specific water quality and salinity targets for meeting groundwater basins water quality objectives and promoting beneficial use of recycled water.(7)Water quality regulations are becoming an increasingly important factor in water agencies selection of raw water sources, treatment alternatives, and modifications to existing treatment facilities.(8)Changes in drinking water quality standards may also impact the usefulness of water supplies and may ultimately impact supply reliability.(9)The quality of source supplies can have a significant impact on water management strategies and supply reliability.(b)This part is intended to provide assistance to water agencies in carrying out their long-term resource planning responsibilities to ensure adequate water supplies to meet existing and future demands for water.(a)The Legislature finds and declares all of the following:
(1)The waters of the state are a limited and renewable resource subject to ever-increasing demands.
(2)The conservation and efficient use of urban water supplies are of statewide concern; however, the planning for that use and the implementation of those plans can best be accomplished at the local level.
(3)A long-term, reliable supply of water is essential to protect the productivity of Californias businesses and economic climate.
(4)As part of its long-range planning activities, every urban water supplier should make every effort to ensure the appropriate level of reliability in its water service sufficient to meet the needs of its various categories of customers during normal, dry, and multiple dry water years.
(5)Public health issues have been raised over a number of contaminants that have been identified in certain some local and imported water supplies.
(6)Implementing effective water management strategies, including groundwater storage projects and recycled water projects, may require specific water quality and salinity targets for meeting groundwater basins water quality objectives and promoting beneficial use of recycled water.
(7)Water quality regulations are becoming an increasingly important factor in water agencies selection of raw water sources, treatment alternatives, and modifications to existing treatment facilities.
(8)Changes in drinking water quality standards may also impact the usefulness of water supplies and may ultimately impact supply reliability.
(9)The quality of source supplies can have a significant impact on water management strategies and supply reliability.
(b)This part is intended to provide assistance to water agencies in carrying out their long-term resource planning responsibilities to ensure adequate water supplies to meet existing and future demands for water.
|
Date
|
Status
|
|---|---|
| Jun 4, 2018 | Ordered to inactive file at the request of Assembly Member Rubio. |
| Apr 25, 2018 | Read second time. Ordered to third reading. |
| Apr 24, 2018 | From committee: Do pass. (Ayes 15. Noes 0.) (April 24). |
| Mar 19, 2018 | Re-referred to Com. on W.,P., & W. |
| Mar 15, 2018 | From committee chair, with author's amendments: Amend, and re-refer to Com. on W.,P., & W. Read second time and amended. |
| Mar 15, 2018 | Referred to Com. on W.,P., & W. |
| Feb 14, 2018 | From printer. May be heard in committee March 16. |
| Feb 13, 2018 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Apr 24, 2018 | Do pass. | Assembly Standing Committee on Water, Parks, and Wildlife |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
ASSEMBLY THIRD READING
ATR Bill Id:AB 2242
Author:(Rubio)
As Amended Ver:March 15, 2018
Majority vote
Committee | Votes | Ayes | Noes |
Water | 15-0 | Eduardo Garcia, Gallagher, Bigelow, Carrillo, Choi, Chu, Friedman, Gloria, Harper, Kalra, Levine, Mathis, Rubio, Salas, Wood |
SUMMARY: Revises the required water supply reliability assessment that is part of urban water suppliers' urban water management plan (UWMP). Specifically, this bill:
- Requires the reliability assessment for normal, dry, and multiple dry years, including a repeat of the five consecutive historic driest years.
- Requires urban water suppliers to consider the reliability of its water service given the combination of supplies, augmentation, and demand management measures it would likely implement.
EXISTING LAW:
- Defines an "urban water supplier" as a supplier, either publicly or privately owned, providing water for municipal purposes either directly or indirectly to more than 3,000 customers or supplying more than 3,000 acre-feet of water annually.
- Requires every urban water supplier to prepare and adopt an UWMP. Requires the UWMP to describe the service area of the supplier and factors affecting the supplier's water management planning. Requires UWMPs to be updated at least once every five years on or before December 31, in years ending in five and zero.
- Requires UWMPs to, among other things, identify and quantify existing and planned sources of water available to the supplier. Requires UWMPs to describe the reliability of water supply to its customers, and vulnerability to seasons or climatic shortage in an average water year, a single-dry water year, and multiple-dry water years. Requires UWMPs to include a description of all water supply projects and water supply programs that may meet the total projected water use. Requires UWMPs to provide a description of the supplier's demand management measures.
- Requires UWMPs to include an assessment of the reliability of its water service to its customer during normal, dry, and multiple dry water years, which compare the total water supply sources available with the total projected water use over 20 years, in 5-year increments.
FISCAL EFFECT: Unknown. This bill is keyed non-fiscal by the Legislative Counsel.
COMMENTS: Background: Water Supply Reliability Assessment and Related Policies. Existing law requires urban water suppliers to complete UWMPs every five years, and submit them to the Department of Water Resources (DWR), the California State Library, and any city or county the urban water supplier serves. UWMPs, among other things, are required to include information about existing and planned water supplies over a 20-year period, and include a description of the climatic vulnerability of those supplies. UWMPs are also required to quantify projected water use over the same 20-year period.
UWMPs are additionally required to have a Water Shortage Contingency Analysis (WSCAs). WSCAs, among other things, must include stages of action to be taken in response to water supply shortages, an estimate of minimum water supply available based on the driest three years on record, and consumption reduction strategies.
UWMPs also require a water supply reliability assessment be provided to any city or county the urban water supplier serves. The water supply reliability assessment must compare total water supply sources available with total projected water use, under specified conditions, including multiple dry-water years, over a 20-year period.
This bill would add to required reporting on water supplies and their reliability. It would specifically require reliability be considered under a number of scenarios, including a repeat of the five driest years on record, in relation to the combination of current and future supplies as well as likely demand reduction efforts.
Water Supply Planning. In 2017 there were eight policy bills and a budget trailer bill on the subject of water supply planning, drought response, and water use efficiency. Two of those bills, AB 1668 (Friedman) of the current legislation session, and SB 606 (Skinner) of the current legislative session, are still actively being worked on and were each amended in early April 2018. SB 606, among other things, contains provisions to revise the water supply reliability assessment.
Analysis Prepared by: Ryan Ojakian / W., P., & W. / (916) 319-2096 FN: 0002735
Date of Hearing: April 24, 2018
ASSEMBLY COMMITTEE ON WATER, PARKS, AND WILDLIFE
Eduardo Garcia, Chair
ABPCA Bill Id:AB 2242 (
Author:Rubio) – As Amended Ver:March 15, 2018
SUBJECT: Urban water management planning
SUMMARY: Revises the required water supply reliability assessment that is part of urban water suppliers’ urban water management plan (UWMP). Specifically, this bill:
- Requires the reliability assessment for normal, dry, and multiple dry years, including a repeat of the five consecutive historic driest years.
- Requires urban water suppliers to consider the reliability of its water service given the combination of supplies, augmentation, and demand management measures it would likely implement.
EXISTING LAW:
- Defines an “urban water supplier” as a supplier, either publicly or privately owned, providing water for municipal purposes either directly or indirectly to more than 3,000 customers or supplying more than 3,000 acre-feet of water annually.
- Requires every urban water supplier to prepare and adopt an UWMP. Requires the UWMP to describe the service area of the supplier and factors affecting the supplier’s water management planning. Requires UWMPs to be updated at least once every five years on or before December 31, in years ending in five and zero.
- Requires UWMPs to, among other things, identify and quantify existing and planned sources of water available to the supplier. Requires UWMPs to describe the reliability of water supply to its customers, and vulnerability to seasons or climatic shortage in an average water year, a single-dry water year, and multiple-dry water years. Requires UWMPs to include a description of all water supply projects and water supply programs that may meet the total projected water use. Requires UWMPs to provide a description of the supplier’s demand management measures.
- Requires UWMPs to include an assessment of the reliability of its water service to its customer during normal, dry, and multiple dry water years, which compare the total water supply sources available with the total project water use over 20 years, in 5-year increments.
FISCAL EFFECT: Unknown.
COMMENTS: This bill revises the required water supply reliability assessment that is part of urban water suppliers’ UWMP.
Author’s Statement:
During California’s most recent drought, urban water management systems were tested and challenged to find new ways to assess water availability during times of extreme drought. It is important that urban water suppliers learn from the past and are prepared to address short and severe drought of the future.
Background: Water Supply Reliability Assessment and Related Policies. Existing law requires urban water suppliers to complete UWMPs every 5 years, and submit them to the Department of Water Resources (DWR), the California State Library, and any city or county the urban water supplier serves. UWMPs, among other things, are required to include information about existing and planned water supplies over a 20-year period, and include a description of the climatic vulnerability of those supplies. UWMPs are also required to quantify projected water use over the same 20-year period.
UWMPs are additionally required to have a Water Shortage Contingency Analysis (WSCAs). WSCAs, among other things, must include stages of action to be taken in response to water supply shortages, an estimate of minimum water supply available based on the driest 3 years on record, and consumption reduction strategies.
UWMPs also require a water supply reliability assessment be provided to any city or county the urban water supplier serves. The water supply reliability assessment must compare total water supply sources available with total projected water use, under specified conditions, including multiple dry-water years, over a 20-year period.
Water Shortage Response In the Recent Drought. California experienced the worst drought in modern times from 2012-2016, with the first four years having been estimated to be the driest four-year period in the last 450 years. While the most recent drought was historic, current climate change models predict that severe drought will become a more common occurrence in the future.
For the first time in the state’s history, the Governor issued an executive order in April of 2015, requiring the State Water Resources Control Board (SWRCB) implement mandatory restrictions on urban water suppliers to achieve a 25 percent statewide reduction in urban potable use, over 2013 levels of use. In May of 2015, the SWRCB adopted an emergency regulation placing each urban water supplier in a conservation tier ranging between 4 percent and 36 percent. There are approximately 410 urban water suppliers that serve approximately 90 percent of the state’s population.
The response to the drought was unprecedented because the severity of the drought was unprecedented. There is widespread agreement that the SWRCB having to step in on an emergency basis is not an ideal plan for future drought response. There is also widespread recognition that climate change will cause the drought of 2012-2016 to become a more typical event in the future.
In 2017 there were 8 policy bills and a budget trailer bill on the subject of water supply planning, drought response, and water use efficiency. Two of those bills, AB 1668 and SB 606, are still actively being worked on and were each amended in early April 2018. SB 606, among other things, contains provisions to revise the water supply reliability assessment.
Prior and Related Legislation:
AB 1654 (Rubio), 2017, among other things, would have restructured the requirements of a WSCA. It was amended to be an intent bill to address water conservation and is currently in Senate Rules Committee.
AB 1668 (Friedman), 2017-2018, contingent with SB 606 (Skinner) being enacted, would jointly create new long-term urban water use standards. The bill is currently in Senate Rules Committee.
SB 606 (Skinner), 2017-2018, contingent with AB 1668 (Friedman) being enacted, would jointly create new long-term urban water use standards. The bill is currently on Assembly Third Reading.
REGISTERED SUPPORT / OPPOSITION:
Support
None on file
Opposition
None on file
Analysis Prepared by: Ryan Ojakian / W., P., & W. / (916) 319-2096
Discussed in Hearing
Assembly Standing Committee on Water, Parks, and Wildlife
Bill Author
Bill Co-Author(s):