AB 2889: Timber harvesting plans: guidance and assistance.
- Session Year: 2017-2018
- House: Assembly
- Latest Version Date: 2018-09-21
Existing law prohibits a person, as defined, from conducting timber operations, as defined, unless a timber harvesting plan that meets specified requirements and is prepared by a professional forester for those operations has been submitted to the Department of Forestry and Fire Protection. Existing law requires the department to review, approve, or require the modification of, timber harvesting plans in accordance with prescribed procedures.
This bill would require the department to provide guidance and assistance to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans, as provided. The bill would also require the department to issue guidance to achieve greater timber harvesting plan review accuracy and efficiency and to avoid duplication of efforts, as provided.
Existing law prohibits a person, as defined, from conducting timber operations, as defined, unless a timber harvesting plan that meets specified requirements and is prepared by a professional forester for those operations has been submitted to the Department of Forestry and Fire Protection. Existing law requires the department to review, approve, or require the modification of, timber harvesting plans in accordance with prescribed procedures.
This bill would require the department to provide guidance and assistance to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans, as provided. The bill would also require the department to issue guidance to achieve greater timber harvesting plan review accuracy and efficiency and to avoid duplication of efforts, as provided.
Existing law prohibits a person, as defined, from conducting timber operations, as defined, unless a timber harvesting plan that meets specified requirements and is prepared by a professional forester for those operations has been submitted to the Department of Forestry and Fire Protection. Existing law requires the department to review, approve, or require the modification of, timber harvesting plans in accordance with prescribed procedures.
This bill would require the department to provide guidance and assistance to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans, as provided. The bill would also require the department to issue guidance to achieve greater timber harvesting plan review accuracy and efficiency and to avoid duplication of efforts, as provided.
Existing law prohibits a person, as defined, from conducting timber operations, as defined, unless a timber harvesting plan that meets specified requirements and is prepared by a professional forester for those operations has been submitted to the Department of Forestry and Fire Protection. Existing law requires the department to review, approve, or require the modification of, timber harvesting plans in accordance with prescribed procedures.
This bill would require the department to implement a Timber Harvesters Bill of Rights, to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans, as provided.This bill would require the department to provide guidance and assistance to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans, as provided.
Existing law prohibits a person, as defined, from conducting timber operations, as defined, unless a timber harvesting plan that meets specified requirements and is prepared by a professional forester for those operations has been submitted to the Department of Forestry and Fire Protection. Existing law requires the department to review, approve, or require the modification of, timber harvesting plans in accordance with prescribed procedures.
This bill would require the department to implement a Timber Harvesters Bill of Rights, to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans, as provided.
Existing law establishes the State Board of Forestry and Fire Protection and requires the board, among other things, to regulate professional foresters in the state. Existing law requires the board to consider matters pertaining to the registration of professional foresters at least once every 6 months at regular meetings and authorizes the board, as necessary, to meet solely for the purpose of considering matters to carry out its functions and duties with regard to laws governing professional foresters.This bill would make a nonsubstantive change in those provisions prescribing meeting requirements for the board.Existing law establishes the State Board of Forestry and Fire Protection and requires the board, among other things, to regulate professional foresters in the state. Existing law requires the board to consider matters pertaining to the registration of professional foresters at least once every 6 months at regular meetings and authorizes the board, as necessary, to meet solely for the purpose of considering matters to carry out its functions and duties with regard to laws governing professional foresters.
This bill would make a nonsubstantive change in those provisions prescribing meeting requirements for the board.
The Legislature finds and declares all of the following:
(a)It is the intent of the Legislature to establish timber harvesting plan submitter assistance consistent with, and in furtherance of, the goals in Article 9.5 (commencing with Section 4629) of Chapter 8 of Part 2 of Division 4 of the Public Resources Code, which includes the promotion of sustainable forest practices, the assurance of consistent funding for timber harvest review, the promotion of transparency of regulatory costs and programs, and the identification and implementation of efficiencies of the regulation of timber harvesting between state agencies.
(b)In the 2017 Assembly Bill 1492 Annual Report to the Joint Legislative Budget Committee on the Timber Regulation and Forest Restoration Program report, required pursuant to Section 4629.9 of the Public Resources Code, it was noted that timber harvesting plan review time averaged 127 days, increasing from 107 days from the previous year even though staffing increased from 191.1 staffers to 211.9 and the total number of timber harvesting plans submitted decreased by six and the total number of acres treated was reduced by over 20,000 acres. Even after timber harvesting plan approval, plan submitters must then seek additional permits, which extends the review time well past 127 days.
(c)The goal of this act is to assist timber harvesting plan submitters, reduce errors in the submission of timber harvesting plans, and reduce the overall review time. The addition of an electronic plan submission program will hopefully significantly reduce the return rate of timber harvesting plans.
SEC. 2.Section 4592.5 is added to the Public Resources Code, to read:4592.5.(a)The department shall provide guidance and assistance to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans. The guidance and assistance shall comply with all of the following requirements:
(1)A plan submitter has the expectation of a timely determination under Section 4582.7 and any relevant administrative regulations.
(2)The department shall provide clearly written guidance documents that explain the regulatory process. In this context, the department shall publish a list of all information required in a plan, using the rules of the board, and an explanation of the criteria that will be used by the department to determine whether the information contained in a plan at the time of submission is adequate.
(3)The department, using the rules of the board, shall provide a checklist that if properly followed by the registered professional forester, should result in a plan that complies with Section 4582 for the purposes of filing. The department, in the implementation of an electronic plan submission program, shall incorporate procedures that address this information.
(b)In addition to the requirements in subdivision (a), the department shall issue guidance to achieve greater timber harvesting plan review accuracy and efficiency and to avoid duplication of efforts. The guidance shall include guidance to responsible agencies that rely on the timber harvesting plan for their analysis under the California Environmental Quality Act (Division 13 (commencing with Section 21000)) when the agencies are issuing a permit to enable implementation of all or part of the project. This guidance shall assist the responsible agencies to avoid duplication in information requests for the responsible agencies permits. Responsible agencies are encouraged to include mitigation measures prior to the close of public comment to ensure they are examined at a sufficient level of detail prior to the close of public comment.
(c)This section does not preclude the department or other public agencies from imposing postapproval compliance requirements as the result of newly discovered or unforeseen conditions.
(d)For purposes of this section, plan or timber harvesting plan includes all forms or documents required to be submitted to the department for review, including, but not limited to, timber harvesting plan documents, program timberland environmental impact reports, program timber harvest plans, modified timber harvesting plans, nonindustrial timber management plans, sustained yield plans, and working forest management plans.
The Legislature finds and declares all of the following:
(a)It is the intent of the Legislature to establish timber harvesting plan submitter assistance consistent with, and in furtherance of, the goals in Article 9.5 (commencing with Section 4629) of Chapter 8 of Part 2 of Division 4 of the Public Resources Code, which includes the promotion of sustainable forest practices, the assurance of consistent funding for timber harvest review, the promotion of transparency of regulatory costs and programs, and the identification and implementation of efficiencies of the regulation of timber harvesting between state agencies.
(b)In the 2017 Assembly Bill 1492 Annual Report to the Joint Legislative Budget Committee on the Timber Regulation and Forest Restoration Program report, required pursuant to Section 4629.9 of the Public Resources Code, it was noted that timber harvesting plan review time averaged 127 days, increasing from 107 days from the previous year even though staffing increased from 191.1 staffers to 211.9 and the total number of timber harvesting plans submitted decreased by six and the total number of acres treated was reduced by over 20,000 acres. Even after timber harvesting plan approval, plan submitters must then seek additional permits, which extends the review time well past 127 days.
(c)The goal of this act is to assist timber harvesting plan submitters, reduce errors in the submission of timber harvesting plans, and reduce the overall review time. The addition of an electronic plan submission program will hopefully significantly reduce the return rate of timber harvesting plans.
SEC. 2.Section 4592.5 is added to the Public Resources Code, to read:4592.5.(a)The department shall provide guidance and assistance to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans. The guidance and assistance shall comply with all of the following requirements:
(1)A plan submitter has the expectation of a timely determination under Section 4582.7 and any relevant administrative regulations.
(2)The department shall provide clearly written guidance documents that explain the regulatory process. In this context, the department shall publish a list of all information required in a plan, using the rules of the board, and an explanation of the criteria that will be used by the department to determine whether the information contained in a plan at the time of submission is adequate.
(3)The department, using the rules of the board, shall provide a checklist that if properly followed by the registered professional forester, should result in a plan that complies with Section 4582 for the purposes of filing. The department, in the implementation of an electronic plan submission program, shall incorporate procedures that address this information.
(b)In addition to the requirements in subdivision (a), the department shall issue guidance to achieve greater timber harvesting plan review accuracy and efficiency and to avoid duplication of efforts. The guidance shall include guidance to responsible agencies that rely on the timber harvesting plan for their analysis under the California Environmental Quality Act (Division 13 (commencing with Section 21000)) when the agencies are issuing a permit to enable implementation of all or part of the project. This guidance shall assist the responsible agencies to avoid duplication in information requests for the responsible agencies permits. Responsible agencies are encouraged to include mitigation measures prior to the close of public comment to ensure they are examined at a sufficient level of detail prior to the close of public comment.
(c)This section does not preclude the department or other public agencies from imposing postapproval compliance requirements as the result of newly discovered or unforeseen conditions.
(d)For purposes of this section, plan or timber harvesting plan includes all forms or documents required to be submitted to the department for review, including, but not limited to, timber harvesting plan documents, program timberland environmental impact reports, program timber harvest plans, modified timber harvesting plans, nonindustrial timber management plans, sustained yield plans, and working forest management plans.
The Legislature finds and declares all of the following:
(a)It is the intent of the Legislature to establish timber harvesting plan submitter assistance consistent with, and in furtherance of, the goals in Article 9.5 (commencing with Section 4629) of Chapter 8 of Part 2 of Division 4 of the Public Resources Code, which includes the promotion of sustainable forest practices, the assurance of consistent funding for timber harvest review, the promotion of transparency of regulatory costs and programs, and the identification and implementation of efficiencies of the regulation of timber harvesting between state agencies.
(b)In the 2017 Assembly Bill 1492 Annual Report to the Joint Legislative Budget Committee on the Timber Regulation and Forest Restoration Program report, required pursuant to Section 4629.9 of the Public Resources Code, it was noted that timber harvesting plan review time averaged 127 days, increasing from 107 days from the previous year even though staffing increased from 191.1 staffers to 211.9 and the total number of timber harvesting plans submitted decreased by 6 six and the total number of acres treated was reduced by over 20,000 acres. Even after timber harvesting plan approval, plan submitters must then seek additional permits permits, which extends the review time well past 127 days.
(c)The goal of this act is to assist timber harvesting plan submitters, reduce errors in the submission of timber harvesting plans, and reduce the overall review time. The addition of an electronic plan submission program will hopefully significantly reduce the return rate of timber harvesting plans.
SEC. 2.Section 4592.5 is added to the Public Resources Code, to read:4592.5.(a)The department shall provide guidance and assistance to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans. The guidance and assistance shall comply with all of the following requirements:
(1)A plan submitter has the expectation of a timely determination under Section 4582.7 and any relevant administrative regulations.
(2)The department shall provide clearly written guidance documents that explain the regulatory process. In this context, the department shall publish a list of all information required in a plan, using the rules of the board, and an explanation of the criteria that will be used by the department to determine whether the information contained in a plan at the time of submission is adequate.
(3)The department, using the rules of the board, shall provide a checklist that if properly followed by the registered professional forester, should result in a plan that complies with Section 4582 for the purposes of filing. The department, in the implementation of an electronic plan submission program, shall incorporate procedures that address this information.
(4)Any agency or department relying on a timber harvesting plan for its analysis pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000) that must issue a permit under its authority that allows the implementation of the project or a portion of the project, as described and analyzed in the timber harvesting plan, shall limit the conditioning of that permit to those applicable mitigation measures incorporated, if any, and adopted in the approved timber harvesting plan.(b)In addition to the requirements in subdivision (a), the department shall issue guidance to achieve greater timber harvesting plan review accuracy and efficiency and to avoid duplication of efforts. The guidance shall include guidance to responsible agencies that rely on the timber harvesting plan for their analysis under the California Environmental Quality Act (Division 13 (commencing with Section 21000)) when the agencies are issuing a permit to enable implementation of all or part of the project. This guidance shall assist the responsible agencies to avoid duplication in information requests for the responsible agencies permits. Responsible agencies are encouraged to include mitigation measures prior to the close of public comment to ensure they are examined at a sufficient level of detail prior to the close of public comment.
(b)(c)This section does not preclude the department or other public agencies from imposing postapproval compliance requirements as the result of newly discovered or unforeseen conditions.
(c)(d)For purposes of this section, plan or timber harvesting plan includes all forms or documents required to be submitted to the department for review, including, but not limited to, timber harvesting plan documents, program timberland environmental impact reports, program timber harvest plans, modified timber harvesting plans, nonindustrial timber management plans, sustained yield plans, and working forest management plans.
The Legislature finds and declares all of the following:
(a)It is the intent of the Legislature to establish timber harvesting plan submitter assistance consistent with, and in furtherance of, the goals in Article 9.5 (commencing with Section 4629) of Chapter 8 of Part 2 of Division 4 of the Public Resources Code, which includes the promotion of sustainable forest practices, the assurance of consistent funding for timber harvest review, the promotion of transparency of regulatory costs and programs, and the identification and implementation of efficiencies of the regulation of timber harvesting between state agencies.
(b)In the 2017 Assembly Bill 1492 Annual Report to the Joint Legislative Budget Committee on the Timber Regulation and Forest Restoration Program report, required pursuant to Section 4629.9 of the Public Resources Code, it was noted that timber harvesting plan review time averaged 127 days, increasing from 107 days from the previous year even though staffing increased from 191.1 staffers to 211.9 and the total number of timber harvesting plans submitted decreased by 6 and the total number of acres treated was reduced by over 20,000 acres. Even after timber harvesting plan approval, plan submitters must then seek additional permits which extends the review time well past 127 days.
(c)The goal of this act is to assist timber harvesting plan submitters, reduce errors in the submission of timber harvesting plans, and reduce the overall review time. The addition of an electronic plan submission program will hopefully significantly reduce the return rate of timber harvesting plans.
SEC. 2.Section 4592.5 is added to the Public Resources Code, to read:4592.5.(a)The department shall provide guidance and assistance to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans. The guidance and assistance shall comply with all of the following requirements:
(1)A plan submitter has the expectation of a timely determination under Section 4582.7 and any relevant administrative regulations.
(2)The department shall provide clearly written guidance documents that explain the regulatory process. In this context, the department shall publish a list of all information required in a plan, using the rules of the board, and an explanation of the criteria that will be used by the department to determine whether the information contained in a plan at the time of submission is adequate.
(3)The department, using the rules of the board, shall provide a checklist that if properly followed by the registered professional forester, should result in a plan that complies with Section 4582 for the purposes of filing. The department, in the implementation of an electronic plan submission program, shall incorporate procedures that address this information.
(4)Any agency or department relying on a timber harvesting plan for its analysis pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000) that must issue a permit under its authority that allows the implementation of the project or a portion of the project, as described and analyzed in the timber harvesting plan, shall limit the conditioning of that permit to those applicable mitigation measures incorporated, if any, and adopted in the approved timber harvesting plan.
(b)This section does not preclude the department or other public agencies from imposing postapproval compliance requirements as the result of newly discovered or unforeseen conditions.
(c)For purposes of this section, plan or timber harvesting plan includes all forms or documents required to be submitted to the department for review, including, but not limited to, timber harvesting plan documents, program timberland environmental impact reports, program timber harvest plans, modified timber harvesting plans, nonindustrial timber management plans, sustained yield plans, and working forest management plans.
SECTION 1.Section 4592.5 is added to the Public Resources Code, to read:4592.5.(a)This section shall be known as the Timber Harvesters Bill of Rights.(b)The department shall implement a Timber Harvesters Bill of Rights to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans. The bill of rights shall comply with all of the following requirements:(1)A person submitting a timber harvesting plan to the department shall have the right to assistance provided by the department and the board regarding the regulatory and permitting requirements applicable to timber harvest plans. The board shall make an ombudsperson available to work with and assist persons intending to file a plan at each location where the department accepts those plans for filing, review, and approval.(2)A person submitting a timber harvesting plan shall have the right to access all clearly written guidance documents prepared by the department that explain the regulatory process. In this connection, the department shall publish a list of all information required in a plan, using the rules of the board and an explanation of the criteria used to determine whether the information contained in a plan is adequate.(3)A person submitting a timber harvesting plan shall have the right to a timely determination under Section 4582.7 and any relevant administrative regulations. The department shall promptly notify a person submitting such a plan regarding whether it is accurate, complete, and in proper order.(4)The department shall provide information to explain the meaning of the terms accurate, complete, and in proper order when used in connection with any determination regarding the completeness or sufficiency of a timber harvesting plan.(5)A person submitting a timber harvesting plan shall have the right to know the basis for any determination that a plan is deficient and to understand what further information is needed to make a plan complete. After a plan is accepted as complete, the department and any other public agency that participates in the review of a plan shall not request any new or additional information that was not specified prior to the filing of an accepted plan.(6)A person submitting a timber harvesting plan shall have the right to a timely decision on the approval of the plan, and the department shall comply with any time periods set forth for the review and approval of any plan as prescribed in statute or any relevant administrative regulations.(7)If a timber harvesting plan is returned to a person without a determination that it is accurate, complete, and in proper order, the director shall provide the ombudsperson and the person submitting the plan with information about what is needed to make the plan complete, and the ombudsperson shall assist the person in completing the plan.(8)The department shall provide a person submitting a timber harvesting plan with information on the designated lead agency that the person shall work with to comply with any plan requirements prescribed in this division or any relevant administrative regulations.(9)A person submitting a timber harvesting plan shall have the right to know who will be reviewing the plan and to be provided with information on the estimated time for completion of the full plan review process.(c)For purposes of this section, plan or timber harvesting plan includes all forms or documents required to be submitted to the department for review, including, but not limited to, timber harvesting plan documents, modified timber harvesting plans, nonindustrial timber harvesting plans, timber harvesting plan exemptions for the harvesting or removal of Christmas trees, dead, dying, or diseased trees, fuelwood, or split products, fire hazard trees within 150 feet of a residence, or substantially damaged timberland, any public agency exemptions, private and public utility exemptions, timberland conversion permits, and notices of emergency timber operations.(a)This section shall be known as the Timber Harvesters Bill of Rights.
(b)The department shall implement a Timber Harvesters Bill of Rights to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans. The bill of rights shall comply with all of the following requirements:
(1)A person submitting a timber harvesting plan to the department shall have the right to assistance provided by the department and the board regarding the regulatory and permitting requirements applicable to timber harvest plans. The board shall make an ombudsperson available to work with and assist persons intending to file a plan at each location where the department accepts those plans for filing, review, and approval.
(2)A person submitting a timber harvesting plan shall have the right to access all clearly written guidance documents prepared by the department that explain the regulatory process. In this connection, the department shall publish a list of all information required in a plan, using the rules of the board and an explanation of the criteria used to determine whether the information contained in a plan is adequate.
(3)A person submitting a timber harvesting plan shall have the right to a timely determination under Section 4582.7 and any relevant administrative regulations. The department shall promptly notify a person submitting such a plan regarding whether it is accurate, complete, and in proper order.
(4)The department shall provide information to explain the meaning of the terms accurate, complete, and in proper order when used in connection with any determination regarding the completeness or sufficiency of a timber harvesting plan.
(5)A person submitting a timber harvesting plan shall have the right to know the basis for any determination that a plan is deficient and to understand what further information is needed to make a plan complete. After a plan is accepted as complete, the department and any other public agency that participates in the review of a plan shall not request any new or additional information that was not specified prior to the filing of an accepted plan.
(6)A person submitting a timber harvesting plan shall have the right to a timely decision on the approval of the plan, and the department shall comply with any time periods set forth for the review and approval of any plan as prescribed in statute or any relevant administrative regulations.
(7)If a timber harvesting plan is returned to a person without a determination that it is accurate, complete, and in proper order, the director shall provide the ombudsperson and the person submitting the plan with information about what is needed to make the plan complete, and the ombudsperson shall assist the person in completing the plan.
(8)The department shall provide a person submitting a timber harvesting plan with information on the designated lead agency that the person shall work with to comply with any plan requirements prescribed in this division or any relevant administrative regulations.
(9)A person submitting a timber harvesting plan shall have the right to know who will be reviewing the plan and to be provided with information on the estimated time for completion of the full plan review process.
(c)For purposes of this section, plan or timber harvesting plan includes all forms or documents required to be submitted to the department for review, including, but not limited to, timber harvesting plan documents, modified timber harvesting plans, nonindustrial timber harvesting plans, timber harvesting plan exemptions for the harvesting or removal of Christmas trees, dead, dying, or diseased trees, fuelwood, or split products, fire hazard trees within 150 feet of a residence, or substantially damaged timberland, any public agency exemptions, private and public utility exemptions, timberland conversion permits, and notices of emergency timber operations.
SECTION 1.Section 760 of the Public Resources Code is amended to read:760.The board shall consider matters pertaining to the registration of professional foresters at least once every six months at regular meetings and may, as necessary, meet solely for the purpose of considering matters to implement the provisions of this article.The board shall consider matters pertaining to the registration of professional foresters at least once every six months at regular meetings and may, as necessary, meet solely for the purpose of considering matters to carry out implement the provisions of this article.
|
Date
|
Status
|
|---|---|
| Sep 21, 2018 | Chaptered by Secretary of State - Chapter 640, Statutes of 2018. |
| Sep 21, 2018 | Approved by the Governor. |
| Aug 29, 2018 | Enrolled and presented to the Governor at 4 p.m. |
| Aug 27, 2018 | In Assembly. Ordered to Engrossing and Enrolling. |
| Aug 27, 2018 | Ordered to the Assembly. |
| Aug 16, 2018 | In Senate. Held at Desk. |
| Aug 16, 2018 | Withdrawn from Engrossing and Enrolling. |
| Aug 14, 2018 | In Assembly. Ordered to Engrossing and Enrolling. |
| Aug 13, 2018 | Read third time. Passed. Ordered to the Assembly. |
| Aug 7, 2018 | Read second time. Ordered to Consent Calendar. |
| Aug 6, 2018 | From committee: Be ordered to second reading file pursuant to Senate Rule 28.8 and ordered to Consent Calendar. |
| Jun 26, 2018 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 9. Noes 0.) (June 26). Re-referred to Com. on APPR. |
| Jun 7, 2018 | Referred to Com. on N.R. & W. |
| May 30, 2018 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 29, 2018 | Read third time. Passed. Ordered to the Senate. |
| May 24, 2018 | Read second time. Ordered to Consent Calendar. |
| May 23, 2018 | From committee: Do pass. To Consent Calendar. (Ayes 16. Noes 0.) (May 23). |
| May 1, 2018 | Re-referred to Com. on APPR. |
| Apr 30, 2018 | Read second time and amended. |
| Apr 26, 2018 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 10. Noes 0.) (April 23). |
| Apr 17, 2018 | Re-referred to Com. on NAT. RES. |
| Apr 16, 2018 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| Mar 20, 2018 | Re-referred to Com. on NAT. RES. |
| Mar 19, 2018 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| Mar 19, 2018 | Referred to Com. on NAT. RES. |
| Feb 17, 2018 | From printer. May be heard in committee March 19. |
| Feb 16, 2018 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 13, 2018 | Consent Calendar AB2889 | Senate Floor |
Passed |
|
| Jun 26, 2018 | Do pass, but first be re-referred to the Committee on [Appropriations] with the recommendation: To Consent Calendar | Senate Standing Committee on Natural Resources and Water |
Passed |
|
| May 29, 2018 | AB 2889 CABALLERO Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| May 23, 2018 | Do pass. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 23, 2018 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB |
CONSENT
Bill No: AB 2889
:
SENATE NATURAL RES. & WATER COMMITTEE: 9-0, 6/26/18
AYES: Hertzberg, Stone, Allen, Hueso, Jackson, McGuire, Monning, Stern, Vidak
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 78-0, 5/29/18 (Consent) - See last page for vote
DIGEST:
This bill requires the California Department of Forestry and Fire Protection (CAL FIRE) to provide guidance and assistance to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans (THPs).
Existing law, pursuant to the Z’Berg-Nejedly Forest Practice Act (FPA):
- Declares that it is the policy of California to encourage prudent and responsible forest resource management calculated to serve the public’s need for timber and other forest products, while giving consideration to the public’s need for watershed protection, fisheries, and wildlife, sequestration of carbon dioxide, and recreational opportunities alike in this and future generations.
- Prohibits timber operations unless a THP has been prepared by a registered professional forester (RPF) and approved by CAL FIRE.
- Considers a THP the functional equivalent of an environmental impact report (EIR) under the California Environmental Quality Act (CEQA).
- Requires a THP to contain a description of the location of the planned harvest, the harvest method, measures to avoid excessive erosion, timeframe of operations, and other information required by forest practice rules (FPR) adopted by the Board of Forestry and Fire Protection (Board).
- Requires the Director of CAL FIRE (Director) to have 30 days from the date of initial inspection, or if no inspection is necessary 15 days from filing to review the plan and take public comment. Specifies the Director has 15 more working days to review public input, consider recommendations and mitigation measures from other agencies, respond in writing to the issues raised and determine if the plan is in compliance with the FPR. Authorizes longer times if they are mutually agreed upon.
- Requires the Director to return the THP if he or she determines the plan is not in conformance with the rules and regulations, and requires the Director to state his or her reasons for the return in writing. Requires the Director to advise the person submitting the THP of the person’s right to a hearing before the Board, and prohibits timber operations from commencing.
- Exempts various tree removal activities from THPs, including Christmas tree farms; rights-of-way for utility lines; conversions of less than three acres; fire prevention; defensible space; and dead, dying, and diseased trees. Requires ministerial permits for certain exemptions, called a notice of exemption, and subjects projects to inspection by CAL FIRE.
- Establishes the Timber Regulation and Forest Restoration Fund (TRFRF) (AB 1492, Committee on Budget, Chapter 289, Statutes of 2012) which receives funding from an authorized 1% assessment on lumber and engineered wood products sold at the retail level. Specifies that TRFRF shall be used with first priority to support the activities and costs of CAL FIRE, the Department of Conservation (DOC), the Department of Fish and Wildlife (DFW), the State Water Resources Control Board (SWRCB), and regional water quality control boards (RWQCB) associated with the review of projects or permits necessary to conduct timber operations.
- Prohibits fees from being charged by CAL FIRE, DOC, DFW, SWRCB, and RWQCB for review of a project, inspection and oversight of projects and permits necessary to conduct timber operations.
- Declares it is the intent of establishing the TRFRF to accomplish, among other things, all of the following:
- Ensure continued sustainable funding for the state forest practice program to protect the state’s forest resources, and replace the current piecemeal funding structure with a single funding source;
- Promote transparency in regulatory costs and programs through the creation of performance measures and accountability for the state’s forest practice regulatory program and simplify the collection and use of critical data to ensure consistency with other pertinent laws and regulations; and,
- Identify and implement efficiencies in the regulation of timber harvesting between state agencies.
This bill:
- Requires the guidance and assistance provided by CAL FIRE to comply with all of the following:
- A THP submitter has the expectation of a timely determination consistent with the timelines in the FPA.
- CAL FIRE will provide clearly written guidance documents that explain the regulatory process. CAL FIRE will publish a list of all information required in a THP, using the Forest Practice Regulations (FPRs), and an explanation of the criteria used to determine whether the information contained in a THP is adequate.
- CAL FIRE will provide a checklist that if properly followed by a RPF will result in a plan that meets the requirements of the Act.
- CAL FIRE will issue guidance to avoid duplication of efforts, including guidance for responsible agencies that rely on THPs for analysis under CEQA, as specified.
- Provides this bill does not preclude CAL FIRE or other public agencies from imposing post-approval compliance requirements as the result of newly discovered or unforeseen conditions.
- Defines “plan” or “timber harvesting plan” to include all forms or documents required to be submitted to CAL FIRE for review, including THPs, program timberland EIRs, program timber harvest plans, modified THPs, nonindustrial timber management plans, sustained yield plans, and working forest management plans.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
American Insurance Association
Associated California Loggers
California Biomass Energy Alliance
California Building Industry Association
California Business Properties Association
California Business Roundtable
California Cattlemen’s Association
California Chamber of Commerce
California Farm Bureau Federation
California Forestry Association
California Licensed Foresters Association
California Low Carbon Fuel and Energy Coalition
Forest Landowners of California
IHI Power Services Corp.
National Association of Mutual Insurance Companies
Pacific Association of Domestic Insurance Companies
Pacific Ultrapower Chinese Station
Personal Insurance Federation of California
Property Casualty Insurer’s Association of America
Rio Bravo Fresno
Rio Bravo Rocklin
Rural County Representatives of California
Sierra Business Council
None received
ARGUMENTS IN SUPPORT: According to the supporters, in 2012, the timber industry supported AB 1492 which, among other things, created a 1% assessment on lumber products sold in California. The dedicated funding is used to support the activities and costs of the departments associated with the review of projects or permits necessary to conduct timber harvest operations, but also to identify and implement efficiencies in the regulations of timber harvesting between state agencies. AB 2889 aligns with the intent of AB 1492.
ASSEMBLY FLOOR: 78-0, 5/29/18
AYES: Acosta, Aguiar-Curry, Travis Allen, Arambula, Baker, Berman, Bigelow, Bloom, Bonta, Brough, Burke, Caballero, Calderon, Carrillo, Cervantes, Chau, Chávez, Chen, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Dahle, Daly, Eggman, Flora, Fong, Frazier, Friedman, Gallagher, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gonzalez Fletcher, Gray, Grayson, Harper, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager-Dove, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Mullin, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Quirk, Quirk-Silva, Reyes, Rodriguez, Rubio, Salas, Santiago, Steinorth, Mark Stone, Thurmond, Ting, Voepel, Waldron, Weber, Wood, Rendon
8/7/18 17:18:40
**** END ****
SENATE COMMITTEE ON NATURAL RESOURCES AND WATER
Senator Robert Hertzberg, Chair
2017 - 2018 Regular
Bill No: AB Hearing Date: June 26, 2018
Author: | Caballero | ||
Version: | April 30, 2018 | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | William Craven | ||
Subject: Timber harvesting plans: guidance and assistance
BACKGROUND AND EXISTING LAW
Pursuant to the Z’Berg-Nejedly Forest Practice Act (FPA):
- Declares that it is the policy of California to encourage prudent and responsible forest resource management calculated to serve the public’s need for timber and other forest products, while giving consideration to the public’s need for watershed protection, fisheries, and wildlife, sequestration of carbon dioxide, and recreational opportunities alike in this and future generations.
- Prohibits timber operations unless a THP has been prepared by a registered professional forester (RPF) and approved by CAL FIRE.
- Considers a THP the functional equivalent of an environmental impact report (EIR) under the California Environmental Quality Act (CEQA).
- Requires a THP to contain a description of the location of the planned harvest, the harvest method, measures to avoid excessive erosion, timeframe of operations, and other information required by forest practice rules (FPR) adopted by the Board of Forestry and Fire Protection (Board).
- Requires the Director of CAL FIRE (Director) to have 30 days from the date of initial inspection, or if no inspection is necessary 15 days from filing to review the plan and take public comment. Specifies the Director has 15 more working days to review public input, consider recommendations and mitigation measures from other agencies, respond in writing to the issues raised and determine if the plan is in compliance with the FPR. Authorizes longer times if they are mutually agreed upon.
- Requires the Director to return the THP if he or she determines the plan is not in conformance with the rules and regulations, and requires the Director to state his or her reasons for the return in writing. Requires the Director to advise the person submitting the THP of the person’s right to a hearing before the Board, and prohibits timber operations from commencing.
- Exempts various tree removal activities from THPs, including Christmas tree farms; rights-of-way for utility lines; conversions of less than three acres; fire prevention; defensible space; and dead, dying, and diseased trees. Requires ministerial permits for certain exemptions, called a notice of exemption (NOE), and subjects projects to inspection by CAL FIRE.
- Establishes the Timber Regulation and Forest Restoration Fund (TRFRF) [AB 1492 (Committee on Budget) Chapter 289, Statutes of 2012] which receives funding from an authorized 1% assessment on lumber and engineered wood products sold at the retail level. Specifies that TRFRF shall be used with first priority to support the activities and costs of CAL FIRE, the Department of Conservation (DOC), the Department of Fish and Wildlife (DFW), the State Water Resources Control Board (SWRCB), and regional water quality control boards (RWQCB) associated with the review of projects or permits necessary to conduct timber operations.
- Prohibits fees from being charged by CAL FIRE, DOC, DFW, SWRCB, and RWQCB for review of a project, inspection and oversight of projects and permits necessary to conduct timber operations.
- Declares it is the intent of establishing the TRFRF to accomplish, among other things, all of the following:
- Ensure continued sustainable funding for the state forest practice program to protect the state’s forest resources, and replace the current piecemeal funding structure with a single funding source;
- Promote transparency in regulatory costs and programs through the creation of performance measures and accountability for the state’s forest practice regulatory program and simplify the collection and use of critical data to ensure consistency with other pertinent laws and regulations; and,
- Identify and implement efficiencies in the regulation of timber harvesting between state agencies.
PROPOSED LAW
This bill requires CAL FIRE to provide guidance and assistance to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans (THPs). Specifically, this bill:
- Requires guidance and assistance to comply with all of the following requirements:
- A THP submitter has the expectation of a timely determination consistent with the timelines in the Forest Practice Act (Act).
- CAL FIRE will provide clearly written guidance documents that explain the regulatory process. CAL FIRE will publish a list of all information required in a THP, using the Forest Practice Regulations (FPRs), and an explanation of the criteria used to determine whether the information contained in a THP is adequate.
- CAL FIRE will provide a checklist that if properly followed by a registered professional forester will result in a plan that meets the requirements of the Act.
- CAL FIRE will issue guidance to avoid duplication of efforts, including guidance for responsible agencies that rely on THPs for analysis under California Environmental Quality Analysis (CEQA), as specified.
- Provides this bill does not preclude CAL FIRE or other public agencies from imposing post-approval compliance requirements as the result of newly discovered or unforeseen conditions.
- Defines “plan” or “timber harvesting plan” to include all forms or documents required to be submitted to CAL FIRE for review, including THPs, program timberland environmental impact reports, program timber harvest plans, modified timber harvesting plans, nonindustrial timber management plans, sustained yield plans, and working forest management plans.
ARGUMENTS IN SUPPORT
In 2012, the timber industry supported AB 1492 which, among other things, created a 1% assessment on lumber products sold in California. The dedicated funding is used to support the activities and costs of the departments associated with the review of projects or permits necessary to conduct timber harvest operations, but also to identify and implement efficiencies in the regulations of timber harvesting between state agencies. AB 2889 would align perfectly with the intent of AB 1492.
ARGUMENTS IN OPPOSITION
None received
COMMENTS
- As noted in earlier analyses, under existing law, prior to conducting any timber operations, a THP must be submitted for approval. This document is a CEQA-equivalent document with CAL FIRE serving as the lead agency, while other departments including Fish and Wildlife, Water Resources and Conservation serve as a part of the review team. Adding up the length of time for all the steps of the THP amounts to 72 days; however, the 2017 Timber Regulation and Forest Restoration Fund Program Report noted that review time averaged 127 days, increasing from 107 days from the previous year. Even after THP approval, THP submitters must then seek additional permits such as a Lake and Streambed Alteration Agreement (known as 1600 permits) and permits associated with non-point source discharges which extends the review time well past 127 days.
- The sponsor of this legislation has indicated that timely review of THPs is a primary concern for industrial timber operators. As a result of AB 1492, the review agencies have been provided with more staff and tasked with identifying and implementing efficiencies in the regulation of timber harvesting between state agencies. However, the sponsor has indicated review times have increased. According to the 2017 AB 1492 report, there are many determinants of review time and some of them are out of the control of the review team. Other factors include weather, staff vacancies, non-responsiveness of the submitter, plans missing basic information, and the complexities of the permit. THPs that propose harvesting on lands with Native American artifacts, a high number of watercourses, and the presence of multiple endangered species will be more complex than THPs without those factors. The AB 1492 report also asserts that the interdisciplinary review team (review team) is searching for efficiencies that will not compromise thoroughness of review. According to the AB 1492 report, THPs can take anywhere between 26 to over 1,600 days to review. The FPA requires a review time of between 46 and 71 days once the plan is accepted. That timeline can be extended if both parties agree. The timeline does not include the time it takes to determine whether the THP is accepted for submittal.
Currently, 30% of THPs are deemed not complete and then resubmitted. The FPRs already require that if a THP is not in conformance with the FPR, the THP is returned, and the Director is required to state any changes and reasonable conditions that, in the Director's professional judgment, are needed to bring the THP into conformance with the FPR. The Director must also offer to confer with the RPF in order to reach agreement on the conditions necessary to bring the THP into conformance. Some RPFs abuse this process and in one case resubmitted a THP six times.
Currently, the Administration is working on ways to improve the efficiency of THP review. This includes the development of an on-line timber harvest permitting system, known as CalTREES, which will allow electronic submittal and immediately identify errors in timber harvest documents and assist correcting them quickly. CAL FIRE is also posting more guidance documents and timber harvesting permit documents online. Finally, the review team is making itself more available to stakeholders to respond to questions or issues.
- Interagency review. The FPR establishes a review team to review THPs and assist CAL FIRE in the evaluation of proposed timber operations and their impacts on the environment. The review team is chaired by the Director and consists of the appropriate RWQCB, DFW, DOC, and other local and state agencies’ representatives depending on where the proposed timber operations will occur. During the review process members of the review team can propose site specific mitigation measures, ask for a pre-harvest inspection, and ask for the Director to issue a non-concurrence. The Director must use the review team’s advice, but that advice is not considered compliance with other laws. The RWQCB must ensure timber operations comply with the Porter-Cologne Water Quality Control Act, Basin Plan objectives, and Total Daily Maximum Load requirements. DFW must ensure timber operations comply with endangered species and stream bed alteration requirements.
- The bill is focused on improving the efficiencies associated with permit approvals and review which is a valid concern. Equally valid, however, is the fact that 30% of the THPs submitted are incomplete, resubmitted (some several times), thereby consuming inordinate amounts of staff time, resources, and taxpayer money. While a new electronic filing system is expected to reduce this number, the author may want to pursue the question of whether and how the Board undertakes any re-training or even disciplinary actions against those who repeatedly file incomplete applications.
SUPPORT
American Insurance Association
Associated California Loggers
California Biomass Energy Alliance
California Building Industry Association
California Business Properties Association
California Business Roundtable
California Cattlemen’s Association
California Chamber of Commerce
California Farm Bureau Federation
California Forestry Association
California Licensed Foresters Association
California Low Carbon Fuel and Energy Coalition
Forest Landowners of California
IHI Power Services Corp.
National Association of Mutual Insurance Companies
Pacific Association of Domestic Insurance Companies
Pacific-Ultrapower Chinese Station
Personal Insurance Federation of California
Property Casualty Insurer’s Association of America
Rio Bravo Fresno
Rio Bravo Rocklin
Rural County Representatives of California
Sierra Business Council
OPPOSITION
None Received
-- END --
Date of Hearing: May 23, 2018
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez Fletcher, Chair
ABPCA Bill Id:AB 2889
Author:(Caballero) – As Amended Ver:April 30, 2018
Policy Committee: | Natural Resources | Vote: | 10 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill requires CAL FIRE to provide guidance and assistance to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans (THPs). Specifically, this bill:
- Requires guidance and assistance to comply with all of the following requirements:
- A THP submitter has the expectation of a timely determination consistent with the timelines in the Forest Practice Act (Act).
- CAL FIRE will provide clearly written guidance documents that explain the regulatory process. CAL FIRE will publish a list of all information required in a THP, using the Forest Practice Regulations (FPRs), and an explanation of the criteria used to determine whether the information contained in a THP is adequate.
- CAL FIRE will provide a checklist that if properly followed by a registered professional forester will result in a plan that meets the requirements of the Act.
- CAL FIRE will issue guidance to avoid duplication of efforts, including guidance for responsible agencies that rely on THPs for analysis under California Environmental Quality Analysis (CEQA), as specified.
- Provides this bill does not preclude CAL FIRE or other public agencies from imposing post-approval compliance requirements as the result of newly discovered or unforeseen conditions.
- Defines “plan” or “timber harvesting plan” to include all forms or documents required to be submitted to CAL FIRE for review, including THPs, program timberland environmental impact reports, program timber harvest plans, modified timber harvesting plans, nonindustrial timber management plans, sustained yield plans, and working forest management plans.
FISCAL EFFECT:
CAL FIRE costs are absorbable.
COMMENTS:
- Background. The Forest Practices Act prohibits timber operations unless a timber harvest plan (THP) is prepared by a registered professional forester and approved by the Director of CALFIRE or the Board of Forestry. A THP is the functional equivalent of an environmental impact report (EIR) under the California Environmental Quality Act (CEQA).
Various tree removal activities are exempt from the requirement to file a THP, including Christmas tree farms, right-of-ways for utility lines, conversions of less than three acres, fire prevention, defensible space, and dead, dying and diseased trees. For certain exemptions, a notice of exemption (NOE), which is a ministerial permit, is required to be filed prior to any activities. Projects for which an NOE is filed are subject to inspection by CAL FIRE.
AB 1492 (Committee on Budget), Chapter 289, Statutes of 2012, extended the life of THPs from three years to five years with an option for a two-year extension. AB 1492 also shifted state fees for a THP to an assessment on all lumber products to fund agency review.
- Purpose. According to the author:
In 2012, the timber industry supported AB 1492 which, among other things, created a 1% assessment on lumber products sold in California. The dedicated funding is used to support the activities and costs of the departments associated with the review of projects or permits necessary to conduct timber harvest operations, but also to identify and implement efficiencies in the regulations of timber harvesting between state agencies. AB 2889 would align perfectly with the intent of AB 1492.
- Related Legislation. AB 1954 (Patterson) extends the sunset date for the exemption from the requirement to complete a THP for maintaining defensible space between 150 feet to 300 feet from a habitable structure. AB 1954 is pending in the Senate.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: April 23, 2018
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Al Muratsuchi, Acting Chair
ABPCA Bill Id:AB 2889 (
Author:Caballero) – As Amended Ver:April 16, 2018
SUBJECT: Timber harvesting plans: guidance and assistance
SUMMARY: Requires the Department of Forestry and Fire Protection (CAL FIRE) to provide guidance and assistance to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to timber harvesting plans (THPs).
EXISTING LAW, pursuant to the Z’Berg-Nejedly Forest Practice Act (FPA):
- Declares that it is the policy of California to encourage prudent and responsible forest resource management calculated to serve the public’s need for timber and other forest products, while giving consideration to the public’s need for watershed protection, fisheries, and wildlife, sequestration of carbon dioxide, and recreational opportunities alike in this and future generations.
- Prohibits timber operations unless a THP has been prepared by a registered professional forester (RPF) and approved by CAL FIRE.
- Considers a THP the functional equivalent of an environmental impact report (EIR) under the California Environmental Quality Act (CEQA).
- Requires a THP to contain a description of the location of the planned harvest, the harvest method, measures to avoid excessive erosion, timeframe of operations, and other information required by forest practice rules (FPR) adopted by the Board of Forestry and Fire Protection (Board).
- Requires the Director of CAL FIRE (Director) to have 30 days from the date of initial inspection, or if no inspection is necessary 15 days from filing to review the plan and take public comment. Specifies the Director has 15 more working days to review public input, consider recommendations and mitigation measures from other agencies, respond in writing to the issues raised and determine if the plan is in compliance with the FPR. Authorizes longer times if they are mutually agreed upon.
- Requires the Director to return the THP if he or she determines the plan is not in conformance with the rules and regulations, and requires the Director to state his or her reasons for the return in writing. Requires the Director to advise the person submitting the THP of the person’s right to a hearing before the Board, and prohibits timber operations from commencing.
- Exempts various tree removal activities from THPs, including Christmas tree farms; rights-of-way for utility lines; conversions of less than three acres; fire prevention; defensible space; and dead, dying, and diseased trees. Requires ministerial permits for certain exemptions, called a notice of exemption (NOE), and subjects projects to inspection by CAL FIRE.
- Establishes the Timber Regulation and Forest Restoration Fund (TRFRF) [AB 1492 (Committee on Budget) Chapter 289, Statutes of 2012] which receives funding from an authorized 1% assessment on lumber and engineered wood products sold at the retail level. Specifies that TRFRF shall be used with first priority to support the activities and costs of CAL FIRE, the Department of Conservation (DOC), the Department of Fish and Wildlife (DFW), the State Water Resources Control Board (SWRCB), and regional water quality control boards (RWQCB) associated with the review of projects or permits necessary to conduct timber operations.
- Prohibits fees from being charged by CAL FIRE, DOC, DFW, SWRCB, and RWQCB for review of a project, inspection and oversight of projects and permits necessary to conduct timber operations.
- Declares it is the intent of establishing the TRFRF to accomplish, among other things, all of the following:
- Ensure continued sustainable funding for the state forest practice program to protect the state’s forest resources, and replace the current piecemeal funding structure with a single funding source;
- Promote transparency in regulatory costs and programs through the creation of performance measures and accountability for the state’s forest practice regulatory program and simplify the collection and use of critical data to ensure consistency with other pertinent laws and regulations; and,
- Identify and implement efficiencies in the regulation of timber harvesting between state agencies.
THIS BILL:
- Requires CAL FIRE to provide guidance and assistance to ensure the uniform and efficient implementation of processes and procedures regulating the filing, review, approval, required modification, completion, and appeal of decisions relating to THPs. Requires guidance and assistance to comply with all of the following requirements:
- A THP submitter has the expectation of a timely determination consistent with the timelines in the Act.
- Requires CAL FIRE to provide clearly written guidance documents prepared by CAL FIRE that explain the regulatory process. Requires CAL FIRE to publish a list of all information required in a THP, using the FPRs, and an explanation of the criteria used to determine whether the information contained in a THP is adequate;
- Requires CAL FIRE using the FPR to provide a checklist that if properly followed by an RPF should result in a plan meeting the filing requirements of the FPA.
- Requires an agency or CAL FIRE relying on a THP for its CEQA analysis that must issue a permit under its authority that allows the implementation of the project or a portion of the project as described, and analyzed in the THP, to limit the conditioning of that permit to those applicable mitigation measures incorporated, and adopted in the approved THP.
- Specifies this bill does not preclude CAL FIRE or other public agencies from imposing post-approval compliance requirements as the result of newly discovered or unforeseen conditions.
- Defines “plan” or “timber harvesting plan” to include all forms or documents required to be submitted to CAL FIRE for review, including THPs, program timberland environmental impact reports, program timber harvest plans, modified timber harvesting plans, nonindustrial timber management plans, sustained yield plans, and working forest management plans.
FISCAL EFFECT: Unknown
COMMENTS:
- Author’s statement:
In 2012, the timber industry supported AB 1492 which, among other things, created a 1% assessment on lumber products sold in California. The dedicated funding is used to support the activities and costs of the departments associated with the review of projects or permits necessary to conduct timber harvest operations, but also to identify and implement efficiencies in the regulations of timber harvesting between state agencies. AB 2889 would align perfectly with the intent of AB 1492.
Under existing law, prior to conducting any timber operations, a THP must be submitted for approval. This document is a CEQA-equivalent document with CAL FIRE serving as the lead agency, while other departments including Fish and Wildlife, Water Resources and Conservation serve as a part of the review team. Adding up the length of time for all the steps of the THP amounts to 72 days; however, the 2017 Timber Regulation and Forest Restoration Fund Program Report noted that review time averaged 127 days, increasing from 107 days from the previous year. Even after THP approval, THP submitters must then seek additional permits such as a Lake and Streambed Alteration Agreement (known as 1600 permits) and permits associated with non-point source discharges which extends the review time well past 127 days.
Regulatory reform and permit streamlining are an integral component to restoring our forests in a timely manner. Long term management means using prescribed fire, removing drought and beetle-killed trees, and thinning our forests. Private timberland owners are not the only ones that manage the forests. This type of work needs to also be done by utility companies, conservation easement organizations, Native American tribes, state and federal governments, and nonprofits.
- Background. California has regulated forest practices on private lands since at least 1945. The Legislature assessed the effectiveness of forest practices and concluded that the industry could not be relied on to ensure proper water quality, forest health, and adequate timber supply. In 1957, the state Senate Interim Committee on Soil and Beach Erosion found that timber harvesting and logging road construction contributed to stream erosion and resultant impacts to fish populations. In 1962, the Assembly Interim Committee on Natural Resources, Planning, and Public Works concluded that timber regulations were inadequately enforced, leading to deleterious effects on water quality, fishing, and recreation. In 1967, after three years of study, the Assembly Subcommittee on Forest Practices and Watershed Management recommended that the basic state policy governing forest practices should be broadened and strengthened. These collective findings, coupled with a 1971 report that identified logging as a primary factor in an 80% decline of salmon and steelhead populations, motivated the Legislature to pass the FPA in 1973. The FPA requires THPs, which are complex discretionary permits that act as an EIR under CEQA.
In 2002, the Senate Office of Research found that timber harvesting in California was failing to adequately protect water quality and endangered species. Concerns were being raised that the Board’s rules were not protective of watersheds and were contributing to the decline of species such as salmon. SB 810 (Burton), Chapter 900, Statutes of 2003, prohibits a THP from being approved if the appropriate RWQCB finds that the proposed timber operations will result in a discharge into a watercourse that has been classified as impaired due to sediment, which causes or contributes to a violation of the regional water quality control plan.
AB 1492 (Committee on Budget), Chapter 289, Statutes of 2012, extended the life of THPs from three years to five years with an option for a two-year extension. AB 1492 also shifted state fees for a THP to an assessment on all lumber products to fund agency review. However, a THP can still cost landowners tens of thousands of dollars to prepare. In 2016 1.5 Billion board feet were harvested in California with an estimated value of approximately $307 million.
- Review time. The sponsor of this legislation has indicated that timely review of THPs is a primary concern for industrial timber operators. As a result of AB 1492, the review agencies have been provided with more staff and tasked with identifying and implementing efficiencies in the regulation of timber harvesting between state agencies. However, the sponsor has indicated review times have increased. According to the 2017 AB 1492 report, there are many determinants of review time and some of them are out of the control of the review team. Other factors include weather, staff vacancies, non-responsiveness of the submitter, plans missing basic information, and the complexities of the permit. THPs that propose harvesting on lands with Native American artifacts, a high number of watercourses, and the presence of multiple endangered species will be more complex than THPs without those factors. The AB 1492 report also asserts that the interdisciplinary review team (review team) is searching for efficiencies that are not allowed to compromise thoroughness of review. According to the AB 1492 report, THPs can take anywhere between 26 to over 1,600 days to review. The FPA requires a review time of between 46 and 71 days once the plan is accepted. That timeline can be extended if both parties agree. The timeline does not include the time it takes to determine whether the THP is accepted for submittal.
Currently, 30% of THPs are deemed not complete and then resubmitted. The FPRs already require that if a THP is not in conformance with the FPR, the THP is returned, and the Director is required to state any changes and reasonable conditions that, in the Director's professional judgment, are needed to bring the THP into conformance with the FPR. The Director must also offer to confer with the RPF in order to reach agreement on the conditions necessary to bring the THP into conformance. Some RPFs abuse this process and in one case resubmitted a THP six times.
Currently, the Administration is working on ways to improve the efficiency of THP review. This includes the development of an on-line timber harvest permitting system, known as CalTREES, which will allow electronic submittal and immediately identify errors in timber harvest documents and assist correcting them quickly. CAL FIRE is also posting more guidance documents and timber harvesting permit documents online. Finally, the review team is making itself more available to stakeholders to respond to questions or issues.
- Interagency review. The FPR establishes a review team to review THPs and assist CAL FIRE in the evaluation of proposed timber operations and their impacts on the environment. The review team is chaired by the Director and consists of the appropriate RWQCB, DFW, DOC, and other local and state agencies’ representatives depending on where the proposed timber operations will occur. During the review process members of the review team can propose site specific mitigation measures, ask for a pre-harvest inspection, and ask for the Director to issue a non-concurrence. The Director must use the review team’s advice, but that advice is not considered compliance with other laws. The RWQCB must ensure timber operations comply with the Porter-Cologne Water Quality Control Act, Basin Plan objectives, and Total Daily Maximum Load requirements. DFW must ensure timber operations comply with endangered species and stream bed alteration requirements. This bill limits those agencies requiring additional mitigation beyond the applicable mitigation measures incorporated, and adopted in the approved THP. This goes beyond guidance and permit assistance which is the stated intent of the bill, and is instead regulatory relief. The author and committee may wish to amend the bill to ensure review team members can require all the necessary mitigation for their permits.
- Related legislation.
AB 425 (Caballero) expands the Forest Fire Prevention Pilot Project (an exemption from THP requirements) to allow temporary roads on slopes of 40% or less to be constructed if specified conditions are met. This bill is pending on the Senate floor.
AB 1954 (Patterson) extends the sunset date for the exemption from the requirement to complete a THP for maintaining defensible space between 150 feet to 300 feet from a habitable structure. This bill is awaiting hearing in the Assembly Appropriations Committee.
REGISTERED SUPPORT / OPPOSITION:
Support
California Forestry Association (sponsor)
American Insurance Association
Association of California Loggers
California Cattlemen’s Association
California Chamber of Commerce
California Farm Bureau Federation
California Business Industry Association
California Business Properties Association
California Business Roundtable
California Licensed Foresters Association
Forest Landowners of California
Green Diamond Resource Company
Humboldt Redwood Companies
IHI Power Services Corp
Low Carbon Fuel and Energy Coalition
Mendocino Redwood Companies
National Association of Mutual Insurance Companies
Pacific Association of Domestic Insurance Companies
Pacific Ultra Power Chinese Station
Personal Insurance Federation of California
Property Casualty Insurers Association of America
Rio Bravo Fresno
Rio Bravo Rocklin
Rural County Representatives of California
Sierra Business Council
Sierra Pacific Industries
1 Individual
Opposition
Center for Biological Diversity
Environmental Protection Information Center
Sierra Club California
Analysis Prepared by: Michael Jarred / NAT. RES. /
Discussed in Hearing
Assembly Standing Committee on Natural Resources
Bill Author
Bill Co-Author(s):