AB 457: Saline water conversion: Diablo Canyon nuclear powerplant.
- Session Year: 2017-2018
- House: Assembly
- Latest Version Date: 2017-05-26
The Cobey-Porter Saline Water Conversion Law required, by July 1, 2004, the Department of Water Resources to report to the Legislature on potential opportunities for the use of seawater and brackish water desalination in California. Existing law required the report to evaluate the impediments to the use of desalination technology and to examine what role, if any, the state should play in furthering the use of desalination in California.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. The Diablo Canyon nuclear powerplant is operated by the Pacific Gas and Electric Company in the County of San Luis Obispo. Existing law establishes the Public Utilities Commission Utilities Reimbursement Account and authorizes the commission to annually determine a fee to be paid by every public utility providing service directly to customers or subscribers and subject to the jurisdiction of the commission.
This bill would require the department, in consultation with specified entities, to conduct commission, as part of the commissions regulatory actions related to the proposed decommissioning of the Diablo Canyon nuclear powerplant and consistent with the goal to mitigate negative impacts to ratepayers, to cause a study to be conducted on the feasibility of repurposing the water desalination facility at the Diablo Canyon Nuclear Plant in the County of San Luis Obispo nuclear powerplant for purposes of desalinating water for local use. The bill would require the commission to contract with an independent 3rd party to carry out the study on its behalf and would require the study to be conducted using moneys from the Public Utilities Commission Utilities Reimbursement Account.
This bill would require the department, in consultation with specified entities, to conduct a study on the feasibility of repurposing the water desalination facility at the Diablo Canyon Nuclear Plant in the County of San Luis Obispo for purposes of desalinating water for local use.
The Cobey-Porter Saline Water Conversion Law required, by July 1, 2004, the Department of Water Resources to report to the Legislature on potential opportunities for the use of seawater and brackish water desalination in California. Existing law required the report to evaluate the impediments to the use of desalination technology and to examine what role, if any, the state should play in furthering the use of desalination in California.
This bill would declare the intent of the Legislature to enact subsequent legislation that would require a study of the feasibility of repurposing for local use water produced by the water desalination facility at the Diablo Canyon Nuclear Plant in the County of San Luis Obispo.
(a)The Department of Water Resources, in consultation with the Board of Supervisors of the County of San Luis Obispo and impacted regional water districts, shall conduct Public Utilities Commission, in accordance with subdivision (b), as part of the commissions regulatory actions related to the purposed decommissioning of the Diablo Canyon nuclear powerplant, and consistent with the goal to mitigate negative impacts to ratepayers, shall cause a study to be conducted on the feasibility of repurposing the water desalination facility at the Diablo Canyon Nuclear Plant nuclear powerplant in the County of San Luis Obispo for the purpose of desalinating water for local use. The study shall determine, but is not limited to, all of the following:
(1)The economic viability of repurposing the facility.
(2)Potential water capacity and potential regional communities that would benefit from the repurposing of the facility.
(3)Unique engineering challenges, if any.
(b)(1)In implementing this section, the department may commission shall contract with an independent third party to carry out the study on its behalf. In carrying out the study, the third party shall consult with the Department of Water Resources, the Board of Supervisors of the County of San Luis Obispo, and impacted regional water districts.
(2)The study shall be conducted using moneys from the Public Utilities Commission Utilities Reimbursement Account.
(a)The Department of Water Resources, in consultation with the Board of Supervisors of the County of San Luis Obispo and impacted regional water districts, shall conduct a study on the feasibility of repurposing the water desalination facility at the Diablo Canyon Nuclear Plant in the County of San Luis Obispo for the purpose of desalinating water for local use. The study shall determine, but is not limited to, all of the following:
(1)The economic viability of repurposing the facility.
(2)Potential water capacity and potential regional communities that would benefit from the repurposing of the facility.
(3)Unique engineering challenges, if any.
(b)In implementing this section, the department may contract with an independent third party to carry out the study on its behalf.
SECTION 1.It is the intent of the Legislature to enact subsequent legislation that would require a study of the feasibility of repurposing for local use water produced by the water desalination facility at the Diablo Canyon Nuclear Plant in the County of San Luis Obispo.It is the intent of the Legislature to enact subsequent legislation that would require a study of the feasibility of repurposing for local use water produced by the water desalination facility at the Diablo Canyon Nuclear Plant in the County of San Luis Obispo.
|
Date
|
Status
|
|---|---|
| Jun 14, 2017 | Referred to Com. on RLS. |
| Jun 1, 2017 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 31, 2017 | Read third time. Passed. Ordered to the Senate. (Ayes 77. Noes 0. Page 1928.) |
| May 30, 2017 | Read second time. Ordered to third reading. |
| May 26, 2017 | From committee: Amend, and do pass as amended. (Ayes 16. Noes 0.) (May 26). |
| May 3, 2017 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| Apr 26, 2017 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 15. Noes 0.) (April 25). Re-referred to Com. on APPR. |
| Apr 3, 2017 | Re-referred to Com. on W.,P., & W. |
| Mar 30, 2017 | Referred to Com. on W.,P., & W. |
| Feb 14, 2017 | From printer. May be heard in committee March 16. |
| Feb 13, 2017 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| May 31, 2017 | AB 457 CUNNINGHAM Assembly Third Reading | Assembly Floor |
Passed |
|
| May 26, 2017 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 25, 2017 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Water, Parks, and Wildlife |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
ASSEMBLY THIRD READING
ATR Bill Id:AB 457
Author:(Cunningham)
As Amended Ver:May 26, 2017
Majority vote
Committee | Votes | Ayes | Noes |
Water | 15-0 | Eduardo Garcia, Gallagher, Bigelow, Choi, Chu, Friedman, Gloria, Bocanegra, Harper, Levine, Mathis, Rubio, Salas, Thurmond, Wood | |
Appropriations | 16-0 | Gonzalez Fletcher, Bigelow, Bloom, Bocanegra, Bonta, Brough, Calderon, McCarty, Quirk, Fong, Friedman, Gallagher, Eduardo Garcia, Gray, Muratsuchi, Reyes |
|
SUMMARY: Require a report related to repurposing of a desalination facility. Specifically, this bill:
- Requires the California Public Utilities Commission (CPUC), as part of its regulatory actions related to the proposed decommissioning of the Diablo Canyon nuclear power plant, to require a study to be conducted on the feasibility of repurposing the water desalination plant at Diablo Canyon nuclear power plant.
- The report is required to address desalinating water for local use.
- Allows the CPUC to contract with an independent third party to carry out the study on its behalf.
- Funding for the study is required to be derived from the Public Utilities Commission Utilities Reimbursement Account.
EXISTING LAW:
- Requires the DWR to report on potential opportunities for the use of seawater and brackish water desalination in California.
- Requires the DWR to evaluate the impediments to the use of desalination technology and to examine what role, if any, the state should play in furthering the use of desalination in California.
- Declares the state's interest in desalination to assist in meeting future water needs. Finds that desalination is feasible to provide new water supplies from seawater, brackish water, and reclaimed water.
- Requires the California Public Utilities Commission (CPUC) to regulate energy rates, and allows the CPUC to open proceedings related to the shutdown of nuclear facilities.
- Requires the CPUC to provide an economic assessment of the impacts of decommissioning the Diablo Canyon Nuclear facility.
FISCAL EFFECT: According to the Assembly Appropriations Committee, one-time, unknown costs to include the feasibility study in the decommissioning study (Public Utilities Commission Utilities Reimbursement Account).
COMMENTS: This bill will require the CPUC to commission a study to determine the feasibility of repurposing the existing Diablo Canyon desalination facility for regional water use as part of an ongoing review of the decommissioning of the nuclear power plant.
Background. The Diablo Canyon Power Plant is a two-unit nuclear power plant operated by the Pacific Gas and Electric Company (PG&E), and is the only remaining operating nuclear power plant in California. According to PG&E, the power plant produces approximately 20% of PG&E's overall electricity production and 10% of California's energy load. The power plant is licensed by the federal Nuclear Regulatory Commission (NRC) to operate until 2024 and 2025, for units 1 and 2. In June 2016, PG&E announced that it would not renew its license for the Diablo Canyon Powerplant.
Purpose of the Bill. According to the author, the drought has been especially severe on the Central Coast and has been a painful reminder that the region needs to work toward more local drought-resistant and drought-proof water sources. During the peak of the drought, the dearth of water put all of California in the "severe" drought category while the entire Central Coast endured the most intense category of "exceptional" drought. There currently exists a functioning desalination facility at the Diablo Canyon Power Plant near Avila Beach. For years, the desalination plant has been used to cool the towers of the adjacent nuclear facility and has produced under 50% of its capacity.
In 2015, the County of San Luis Obispo was reviewing plans to build a pipeline from the plant into existing water delivery systems in the county. However, those plans were recently put on hold since the announcements of the Diablo Canyon decommission process.
Despite the closure of the nuclear power plant, the desalination plant could potentially be used for the sole purpose of providing drought-proof regional water supply. In its current state, the facility has the capacity to provide 300 acre-feet of water per year.
However, more information is needed to understand the engineering, logistical, and economic challenges involved with repurposing the facility, as well as the regional benefits.
Related Legislation.
SB 968 (Monning), Chapter 674, Statutes of 2016, requires the CPUC to cause an assessment to be completed by July 1, 2018, related to the shutdown of Diablo Canyon Units 1 and 2 power plants. The assessment is required to include the adverse and beneficial economic impacts, and the net economic effects, for the County of San Luis Obispo and the surrounding regions, that could occur if the power plant were to temporarily or permanently shut down before the current operating licenses expire, or upon the expiration of its current licenses.
Analysis Prepared by: Catherine Freeman / W., P., & W. / (916) 319-2096 FN: 0000709
Date of Hearing: May 3, 2017
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez Fletcher, Chair
ABPCA Bill Id:AB 457
Author:(Cunningham) – As Amended Ver:March 30, 2017
Policy Committee: | Water Parks and Wildlife | Vote: | 15 - 0 |
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill requires the Department of Water Resources (DWR), in consultation with the Board of Supervisors of the County of San Luis Obispo and impacted regional water districts, to conduct a study on the feasibility of repurposing the water desalination facility at the Diablo Canyon Nuclear Plan in the County of San Luis Obispo for the purpose of desalting water for local use. Additionally, this bill requires, but does not limit, the report to determine the following:
- The economic viability of repurposing the facility;
- Potential water capacity and potential regional communities that would benefit from repurposing the facility; and
- Unique engineering challenges, if any.
This bill allows DWR to contract with an independent third party to carry out the study on its behalf.
FISCAL EFFECT:
One-time DWR GF costs of $2 million and additional unknown contract costs to perform the feasibility study.
COMMENTS:
- Purpose. According to the author, the Diablo Canyon desalination facility provides an opportunity to leverage existing infrastructure and bring additional drought-proof water to Central Coast residents. The author contends that the facility provides a great deal of promise, but there remain a number of questions about the economic and logistical viability of using the facility, and a comprehensive study would be a modest investment to better understand whether this is an option. This bill requires DWR to perform a study on the feasibility of repurposing the power plant as a desalination facility.
- Background. PG&E’s Diablo Canyon is the
only operating nuclear powerplant in California. According to PG&E, the plant produces approximately 10% of California’s energy load and about 20% of PG&E’s overall electricity.
Diablo Canyon is licensed by the federal Nuclear Regulatory Commission (NRC) to operate until 2024 and 2025, respectively for units 1 and 2.
In addition to the application with NRC, Diablo Canyon’s continued operation is subject to state permitting and regulation. Diablo Canyon sits on state tidelands and operates pursuant to leases issued by the State Lands Commission (SLC). These leases will expire in 2018 and 2019, respectively for units 1 and 2. The SLC has not indicated whether it will renew the leases. The Public Utilities Commission (PUC) must also approve ratepayer funding to pay for Diablo Canyon’s operations.
According to San Luis Obispo County, PG&E is both the largest taxpayer and largest private employer in the county. Diablo Canyon itself generates millions of dollars in property tax revenue, which mainly benefits local schools. A June 2013 Economic Impact Study, funded by PG&E, concluded that the local economic impact of Diablo Canyon is substantial, with the total 2011 estimated economic impact to be approximately $920 million. The powerpant has approximately 1,483 employees and it is estimated that this year the San Luis Coastal Unified School District will receive more than $10 million (12% of its operating revenue) from taxes paid by PG&E.
On June 21, 2016, PG&E announced it will not renew its license for the two nuclear units at Diablo Canyon but it will continue paying property taxes through 2025, as well as enact workforce retention and retraining programs.
- Should the State Pay for the Feasibility Study?
The plans to close the nuclear power plant effectively stalled a local desalination project. The project, estimated to cost $22 million to $36 million, would have involved expanding the reverse osmosis system that supplies Diablo Canyon with fresh water for its operations. Seven miles of pipeline would have been installed from the nuclear plant to the Lopez Lake pipeline in Avila Beach, delivering up to 1,300 acre-feet of water to the cities of Pismo Beach, Arroyo Grande and Grover Beach, as well as the Oceano and Avila Beach community services districts. In March 2016, the county Board of Supervisors voted unanimously to spend $900,000 for planning and permitting for the project, which was expected to take about two years to complete. The project would have ultimately been paid for by water ratepayers.
Since the closure of the power plant, there has been some interest by General Electric in converting the power plant to a desalination facility.
It is unclear if it is appropriate for the state to pay for a feasibility study for a desalination facility that may be privately or locally owned in the future.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: April 25, 2017
ASSEMBLY COMMITTEE ON WATER, PARKS, AND WILDLIFE
Eduardo Garcia, Chair
ABPCA Bill Id:AB 457 (
Author:Cunningham) – As Amended Ver:March 30, 2017
SUBJECT: Saline water conversion: Diablo Canyon Nuclear Plant
SUMMARY: Require a report related to repurposing of a desalination facility. Specifically, this bill:
- Requires the Department of Water Resources (DWR), in consultation with the Board of Supervisors of the County of San Luis Obispo and impacted regional water districts, to conduct a study on the feasibility of repurposing the water desalination facility at the Diablo Canyon Nuclear Plan in the County of San Luis Obispo.
- The report is required to address desalinating water for local use.
EXISTING LAW:
- Requires the DWR to report on potential opportunities for the use of seawater and brackish water desalination in California.
- Requires the DWR to evaluate the impediments to the use of desalination technology and to examine what role, if any, the state should play in furthering the use of desalination in California.
- Declares the state’s interest in desalination to assist in meeting future water needs. Finds that desalination is feasible to provide new water supplies from seawater, brackish water, and reclaimed water.
- Requires all urban water suppliers to prepare and adopt an urban water management plan, and update them every five years. Among other requirements, urban water management plans must identify and quantify water resources, including desalination.
- Requires the California Public Utilities Commission (CPUC) to regulate energy rates, and allows the CPUC to open proceedings related to the shutdown of nuclear facilities.
- Requires the CPUC to provide an economic assessment of the impacts of decommissioning the Diablo Canyon Nuclear facility.
FISCAL EFFECT: Unknown
COMMENTS: This bill will require the DWR to commission a study to determine the feasibility of repurposing the existing Diablo Canyon desalination facility for regional water use.
Author’s Statement:
As we continue to climb out of the drought, it is important to explore all possible sources of water to ensure we have consistent supply for years to come. The Diablo Canyon desalination facility provides an opportunity to leverage existing infrastructure and bring additional drought-proof water to Central Coast residents. The facility provides a great deal of promise, but there remain a number of questions about the economic and logistical viability of using the facility, and a comprehensive study would be a modest investment to better understand whether this is an option. There is currently no plan for continuing to use the desalination plant (with a decades long record of environmentally safe water production) after the power plant shuts down in 2025.
Background. The Diablo Canyon Powerplant is a two-unit nuclear powerplant operated by the Pacific Gas and Electric Company (PG&E), and is the only remaining operating nuclear powerplant in California. According to PG&E, the powerplant produces approximately 20% of PG&E’s overall electricity production and 10% of California's energy load. The powerplant is licensed by the federal Nuclear Regulatory Commission (NRC) to operate until 2024 and 2025, for units 1 and 2. In June 2016, PG&E announced that it would not renew its license for the Diablo Canyon Powerplant.
Purpose of the Bill. According to the author, the drought has been especially severe on the Central Coast and has been a painful reminder that the region needs to work toward more local drought-resistant and drought-proof water sources. During the peak of the drought, the dearth of water put all of California in the “severe” drought category while the entire Central Coast endured the most intense category of “exceptional” drought. There currently exists a functioning desalination facility at the Diablo Canyon Power Plant near Avila Beach. For years, the desalination plant has been used to cool the towers of the adjacent nuclear facility and has produced under fifty percent of its capacity.
In 2015, the County of San Luis Obispo was reviewing plans to build a pipeline from the plant into existing water delivery systems in the county. However, those plans were recently put on hold since the announcements of the Diablo Canyon decommission process.
Despite the closure of the nuclear power plant, the desalination plant could potentially be used for the sole purpose of providing drought-proof regional water supply. In its current state, the facility has the capacity to provide 300 acre-feet of water per year.
However, more information is needed to understand the engineering, logistical, and economic challenges involved with repurposing the facility, as well as the regional benefits.
Related Legislation.
- SB 968 (Monning), Chapter 674, Statutes of 2016, requires the CPUC to cause an assessment to be completed by July 1, 2018 related to the shutdown of Diablo Canyon Units 1 and 2 power plants. The assessment is required to include the adverse and beneficial economic impacts, and the net economic effects, for the County of San Luis Obispo and the surrounding regions, that could occur if the power plant were to temporarily or permanently shut down before the current operating licenses expire, or upon the expiration of its current licenses.
- AB 554 (Cunningham), of the current session, establishes a statewide goal to desalinate 300,000 acre-feet of water a year by 2025 and 500,000 acre-feet a year by 2030. The bill also makes findings that water supplies are diminishing, that there is a need for greater certainty in access to high quality water, and that desalinated water can meet a portion of future water demands.
REGISTERED SUPPORT / OPPOSITION:
Support
County of San Luis Obispo
Individual (1)
Opposition
None on file
Analysis Prepared by: Catherine Freeman / W., P., & W. /
Discussed in Hearing