AB 758: Transportation: Tri-Valley-San Joaquin Valley Regional Rail Authority.
- Session Year: 2017-2018
- House: Assembly
- Latest Version Date: 2017-10-13
Existing law provides for the creation of statewide and local transportation agencies, which may be established as joint powers authorities or established expressly by statute. Existing law establishes the Bay Area Rapid Transit District, which is authorized to acquire, construct, own, operate, control, or use rights-of-way, rail lines, bus lines, stations, platforms, switches, yards, terminals, parking lots, and any and all other facilities necessary or convenient for rapid transit service.
This bill would establish the Tri-Valley-San Joaquin Valley Regional Rail Authority for purposes of planning, developing, and delivering cost-effective and responsive transit connectivity between the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express commuter rail service in the Tri-Valley, that meets the goals and objectives of the community, as specified. The bill would require the authoritys governing board to be composed of 15 representatives. The bill would specify the powers and duties of the authority and would require the unencumbered balance of all local funds programmed for completion of the Bay Area Rapid Transit Districts Livermore extension or that have otherwise been identified for the connectivity to be transferred to the authority, except as specified. The bill would authorize the authority to pursue any and all sources of funding, but would prohibit the authority from applying for funds available under the Transportation Development Act for which any member entity of the authority may also be an applicant or for which any member entity of the authority is charged with approving applications for funding under that act, without the express written consent of that affected member entity. The bill would require the authority by July 1, 2019, to provide a project feasibility report to the public, to be posted on the authoritys Internet Web site, on the plans for the development and implementation of transit connectivity and to submit that report upon completion to specified entities.
By imposing new duties on local governmental entities, this bill would create a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law provides for the creation of statewide and local transportation agencies, which may be established as joint powers authorities or established expressly by statute. Existing law establishes the Bay Area Rapid Transit District, which is authorized to acquire, construct, own, operate, control, or use rights-of-way, rail lines, bus lines, stations, platforms, switches, yards, terminals, parking lots, and any and all other facilities necessary or convenient for rapid transit service.
This bill would establish the Tri-Valley-San Joaquin Valley Regional Rail Authority for purposes of planning, developing, and delivering cost-effective and responsive transit connectivity between the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express commuter rail service in the Tri-Valley, that meets the goals and objectives of the community, as specified. The bill would require the authoritys governing board to be composed of 15 representatives. The bill would specify the powers and duties of the authority and would require the unencumbered balance of all local funds programmed for completion of the Bay Area Rapid Transit Districts Livermore extension or that have otherwise been identified for the connectivity to be transferred to the authority, except as specified. The bill would authorize the authority to pursue any and all sources of funding, but would prohibit the authority from applying for funds available under the Transportation Development Act for which any member entity of the authority may also be an applicant or for which any member entity of the authority is charged with approving applications for funding under that act, without the express written consent of that affected member entity. The bill would require the authority by July 1, 2019, to provide a project feasibility report to the public, to be posted on the authoritys Internet Web site, on the plans for the development and implementation of transit connectivity and to submit that report upon completion to specified entities.
By imposing new duties on local governmental entities, this bill would create a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law provides for the creation of statewide and local transportation agencies, which may be established as joint powers authorities or established expressly by statute. Existing law establishes the Bay Area Rapid Transit District, which is authorized to acquire, construct, own, operate, control, or use rights-of-way, rail lines, bus lines, stations, platforms, switches, yards, terminals, parking lots, and any and all other facilities necessary or convenient for rapid transit service.
This bill would establish the Tri-Valley-San Joaquin Valley Regional Construction Rail Authority for purposes of planning and developing a planning, developing, and delivering cost-effective and responsive connection transit connectivity between the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express commuter rail service in the Tri-Valley, that meets the goals and objectives of the community. community, as specified. The bill would require the authoritys governing board to be composed of 12 15 representatives. The bill would specify the powers and duties of the authority, authority and would require the unencumbered balance of all local funds programmed for completion of the Bay Area Rapid Transit Districts Livermore extension or that have otherwise been identified for the connection connectivity to be transferred to the authority, and would designate an operator for the completed connection. except as specified. The bill would authorize the authority to pursue any and all sources of funding, but would prohibit the authority from applying for funds available under the Transportation Development Act for which any member entity of the authority may also be an applicant or for which any member entity of the authority is charged with approving applications for funding under that act, without the express written consent of that affected member entity. The bill would require the authority to annually by July 1, 2019, to provide a project feasibility report to the public, to be posted on the authoritys Internet Web site, on the plans for the development and implementation of the connection. transit connectivity and to submit that report upon completion to specified entities.
By imposing new duties on local governmental entities, this bill would create a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law provides for the creation of statewide and local transportation agencies, which may be established as joint powers authorities or established expressly by statute. Existing law establishes the Bay Area Rapid Transit District, which is authorized to acquire, construct, own, operate, control, or use rights-of-way, rail lines, bus lines, stations, platforms, switches, yards, terminals, parking lots, and any and all other facilities necessary or convenient for rapid transit service.
This bill would establish the Tri-Valley-San Joaquin Valley Regional Rail Construction Authority for purposes of planning and developing a cost-effective and responsive connection between the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express in the Tri-Valley, that meets the goals and objectives of the community. The bill would require the authoritys governing board to be composed of 14 12 representatives. The bill would specify the powers and duties of the authority, would require the unencumbered balance of all local funds programmed for completion of the Bay Area Rapid Transit Districts Livermore extension or that have otherwise been identified for the connection to be transferred to the authority, and would designate an operator for the completed connection. The bill would authorize the authority to pursue any and all sources of funding, but would prohibit the authority from applying for funds available under the Transportation Development Act for which any member entity of the authority may also be an applicant or for which any member entity of the authority is charged with approving applications for funding under that act, without the express written consent of that affected member entity. The bill would require the authority to annually provide a project feasibility report to the public, to be posted on the authoritys Internet Web site, on the plans for the development and implementation of the connection.
By imposing new duties on local governmental entities, this bill would create a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law provides for the creation of statewide and local transportation agencies, which may be established as joint powers authorities or established expressly by statute. Existing law establishes the Bay Area Rapid Transit District, which is authorized to acquire, construct, own, operate, control, or use rights-of-way, rail lines, bus lines, stations, platforms, switches, yards, terminals, parking lots, and any and all other facilities necessary or convenient for rapid transit service.
This bill would establish the Tri-Valley-San Joaquin Valley Regional Rail Authority for purposes of planning and delivering developing a cost effective cost-effective and responsive interregional rail connection between the San Joaquin Valley and the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express in the Tri-Valley, that meets the goals and objectives of the community. The bill would require the authoritys governing board to be composed of 14 representatives and would authorize the authority to appoint an executive who may appoint staff or retain consultants. representatives. The bill would provide specified authorizations and duties to the authority.
This bill would require all unencumbered moneys dedicated for the completion of the connection to be transferred to the authority. The bill would require the Bay Area Rapid Transit District to assume ownership of all physical improvements, and to assume operational control, maintenance responsibilities, and related financial obligations for the connection, upon its completion. The bill would require the Department of Transportation to expedite reviews and requests related to the connection. The bill would require the require the authority to annually provide a project update feasibility report to the public, to be posted on the authoritys Internet Web site, on the plans for the development and implementation of the connection.
By imposing new duties on local governmental entities, this bill would create a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law provides for the creation of statewide and local transportation agencies, which may be established as joint powers authorities or established expressly by statute. Existing law establishes the Bay Area Rapid Transit District, which is authorized to acquire, construct, own, operate, control, or use rights-of-way, rail lines, bus lines, stations, platforms, switches, yards, terminals, parking lots, and any and all other facilities necessary or convenient for rapid transit service.
This bill would establish the Tri-Valley-San Joaquin Valley Regional Rail Authority for purposes of planning and delivering a cost effective and responsive interregional rail connection between the San Joaquin Valley and the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express in the Tri-Valley, that meets the goals and objectives of the community. The bill would require the authoritys governing board to be composed of 14 representatives and would authorize the authority to appoint an executive who may appoint staff or retain consultants. The bill would provide specified authorizations and duties to the authority.
This bill would require all unencumbered moneys dedicated for the completion of the connection to be transferred to the authority. The bill would require the Bay Area Rapid Transit District to assume ownership of all physical improvements, and to assume operational control, maintenance responsibilities, and related financial obligations for the connection, upon its completion. The bill would require the Department of Transportation to expedite reviews and requests related to the connection. The bill would require the authority to provide a project update report to the public, to be posted on the authoritys Internet Web site, on the development and implementation of the connection.
By imposing new duties on local governmental entities, this bill would create a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
The Passenger Charter-party Carriers Act provides for the regulation of charter-party carriers of passengers by the Public Utilities Commission and includes specific requirements for liability insurance coverage, background checks, and other regulatory matters applicable to transportation network companies, as defined, and their participating drivers, as defined.This bill would make a nonsubstantive change to the definition of a participating driver for purposes of the regulation of transportation network companies.The Passenger Charter-party Carriers Act provides for the regulation of charter-party carriers of passengers by the Public Utilities Commission and includes specific requirements for liability insurance coverage, background checks, and other regulatory matters applicable to transportation network companies, as defined, and their participating drivers, as defined.
This bill would make a nonsubstantive change to the definition of a participating driver for purposes of the regulation of transportation network companies.
The Legislature finds and declares all of the following:
(a)Commute patterns throughout northern California, and in particular through the Altamont Pass Corridor, traverse the boundaries of traditional metropolitan planning agencies. The Altamont Pass Corridor, located in the center of the Northern California Megaregion, connects the San Joaquin Valley to the Tri-Valley and is a vital node in the megaregions economic ecosystem as well as a key megaregion transportation route. Strategic and planned interregional mobility throughout the Altamont Pass Corridor is essential to sustained economic vitality in the megaregion.
(b)The Interstate 580 freeway serves the Altamont Pass Corridor and ranks as one of the most congested freeways in the megaregion during peak hours due to a high volume of regional and interregional commuter, freight, and recreational traffic. It is estimated that traffic on portions of Interstate 580 in this corridor will increase by up to 60 percent between 2013 and 2040.
(c)Connecting the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express, and providing expanded passenger rail connectivity between the San Joaquin Valley and the Bay Area, as recommended by the Metropolitan Transportation Commissions regional rail plan, would increase interregional mobility and provide much-needed highway capacity for expanded goods movement to the Bay Areas five seaports and the inland Port of Stockton. It would also relieve pressure on Interstate 580 and other transportation systems, given the large exponential population growth in the San Joaquin Valley.
(d)The Department of Finance projects that San Joaquin County, along with other counties in the San Joaquin Valley, will be among the fastest growing counties in the state. Between 1990 and 2013, the number of people commuting daily from the northern San Joaquin Valley to the Bay Area more than doubled, growing from 32,000 to nearly 65,000 commuters. This trend is expected to continue with the San Joaquin Valleys rapid population growth combined with the increasing high housing costs and strong job growth in the Bay Area.
(e)Because transportation is the major contributor to ozone precursors, increasing auto travel threatens improvement in air quality throughout the megaregion. Growing congestion will add to potential problems because of increased emissions of vehicles operating in stop-and-go traffic. Shifting commuters and other travelers to rail transportation between the San Joaquin Valley and the Bay Area is highly desirable as a means to partially offset the effects on air quality produced by the growth in auto travel.
(f)Taxpayers in Alameda County have voted to tax themselves to achieve expanded transit services to the Tri-Valley region.
(g)The State of California supports enhanced public transit services that improve connectivity between transit operators and provide seamless and convenient travel for public transit passengers.
SEC. 2.It is the intent of the Legislature to establish the Tri-Valley-San Joaquin Valley Regional Rail Authority to plan and help deliver a cost-effective connection from the San Joaquin Valley to the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express in the Tri-Valley, to address regional economic and transportation challenges.
SEC. 3.Chapter 8 (commencing with Section 132651) is added to Division 12.7 of the Public Utilities Code, to read:8. Tri-Valley-San Joaquin Valley Regional Rail Authority132651.As used in this chapter, the following terms have the following meanings:
(a)Authority means the Tri-Valley-San Joaquin Valley Regional Rail Authority created under this chapter.
(b)Bay Area Rapid Transit (BART) means the Bay Area Rapid Transit District.
(c)Board means the governing board of the authority.
(d)Connectivity means one or more projects necessary to achieve transit connectivity between BARTs rapid transit system and the San Joaquin Regional Rail Commissions Altamont Corridor Express commuter rail service, and to provide quality, seamless service to riders using the services operating between the Tri-Valley and the San Joaquin Valley.
(e)Tri-Valley means the Cities of Danville, Dublin, Livermore, Pleasanton, and San Ramon.
132652.The authority is hereby established for purposes of planning, developing, and delivering cost-effective and responsive transit connectivity, between BARTs rapid transit system and the Altamont Corridor Express commuter rail service in the Tri-Valley region of California, that reflects regional consensus and meets the goals and objectives of the San Joaquin Valley and Tri-Valley communities, consistent with the project feasibility report adopted pursuant to Section 132661.
132655.The governing board of the authority shall be composed of one representative from each of the following entities to be appointed by the governing board, mayor, or supervisor of each entity:
(a)The Bay Area Rapid Transit District.
(b)The City of Dublin.
(c)The City of Lathrop.
(d)The City of Livermore.
(e)The City of Manteca.
(f)The City of Pleasanton.
(g)The City of Stockton.
(h)The City of Tracy.
(i)The County of Alameda.
(j)The County of San Joaquin.
(k)The Livermore Amador Valley Transit Authority.
(l)The Mountain House Community Services District.
(m)The San Joaquin Regional Rail Commission.
(n)The City of Danville.
(o)The City of San Ramon.
132656.The authority has all of the powers necessary for planning, acquiring, leasing, developing, jointly developing, owning, controlling, using, jointly using, disposing of, designing, procuring, and constructing facilities to achieve transit connectivity, including, but not limited to, all of the following:
(a)Acceptance of grants, fees, allocations, and transfers of moneys from federal, state, and local agencies, including, but not limited to, moneys from local measures, as well as private entities.
(b)Acquiring, through purchase or through eminent domain proceedings, any property necessary for, incidental to, or convenient for, the exercise of the powers of the authority.
(c)Incurring indebtedness, secured by pledges of available revenue.
(d)Contracting with public and private entities for the planning, design, and construction of the connection. These contracts may be assigned separately or may be combined to include any or all tasks necessary to achieve transit connectivity.
(e)Entering into cooperative or joint development agreements with local governments or private entities necessary to achieve transit connectivity. These agreements may be entered into for purposes of sharing costs, selling or leasing land, air, or development rights, providing for the transferring of passengers, making pooling arrangements, or for any other purpose that is necessary for, incidental to, or convenient for the full exercise of the powers granted to the authority. For purposes of this paragraph, joint development includes, but is not limited to, an agreement with any person, firm, corporation, association, or organization for the operation of facilities or development of projects adjacent to, or physically or functionally related to, achieving transit connectivity.
(f)Relocation of utilities, as necessary to achieve transit connectivity.
132657.For an initial 18-month period, the Livermore Amador Valley Transit Authoritys administrative staff shall, if that authority has appointed a member to the board in accordance with Section 132655, provide all necessary administrative support to the board to perform its duties and responsibilities. At the conclusion of the initial period, the board may select the Livermore Amador Valley Transit Authority or the San Joaquin Regional Rail Commission to provide administrative support, or may alternatively hire an executive director for those functions. If an executive director is hired, the executive may appoint staff or retain consultants as necessary to carry out the duties of the authority.
132658.(a)The unencumbered balance of all local funds programmed for the completion of the BART Livermore extension or that have otherwise been identified for the connectivity shall be transferred to the authority and be considered resources available to effectuate the authoritys purposes pursuant to this chapter, except that local funds controlled by the Alameda County Transportation Commission to be used for completion of the BART Livermore extension or that have otherwise been identified for the connectivity shall continue to be programmed and allocated by the Alameda County Transportation Commission pursuant to measures approved by the voters of Alameda County pursuant to Division 19 (commencing with Section 180000).
(b)The unencumbered balance of all local funds programmed for the completion of the BART Livermore extension shall be transferred to the authority and be considered resources available to effectuate the authoritys purposes pursuant to this chapter, except that local funds controlled by the San Joaquin Regional Rail Commission that have otherwise been identified for connectivity shall continue to be programmed and allocated by the San Joaquin Regional Rail Commission pursuant to measures approved by the voters of San Joaquin County pursuant to Division 19 (commencing with Section 180000).
(c)The authority is eligible to apply for and receive state and federal funds to perform its duties pursuant to this chapter.
(d)The authority may pursue any and all sources of funding to achieve connectivity except that the authority shall not apply for funds available under the Transportation Development Act (Chapter 4 (commencing with Section 99200) of Part 11 of Division 10) for which any member entity of the authority may also be an applicant or for which any member entity of the authority is charged with approving applications for funding under that act, without the express written consent of that affected member entity.
132659.(a)The authority may enter into agreements with the Bay Area Rapid Transit District, the San Joaquin Regional Rail Commission, or any other entity to address any and all issues necessary to achieve transit connectivity, consistent with the project feasibility reports findings, conclusions, and recommendations adopted pursuant to Section 132661.
(b)If the project feasibility report includes a recommendation for an extension of BARTs rapid transit system, the governing board of the Bay Area Rapid Transit District shall have the authority to approve or deny the recommendation.
(c)If the project feasibility report includes a recommendation for an extension of the Altamont Corridor Express commuter rail service, the governing board of the San Joaquin Regional Rail Commission shall have the authority to approve or deny the recommendation.
132660.The authority and any entity contracted with to serve as the operator of any transit connectivity developed and delivered pursuant to this chapter shall be subject to all of the following:
(a)The Meyers-Milias-Brown Act (Chapter 10 (commencing with Section 3500) of Division 4 of Title 1 of the Government Code).
(b)The California Public Records Act (Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1 of the Government Code).
(c)The Ralph M. Brown Act (Chapter 9 (commencing with Section 54950) of Part 1 of Division 2 of Title 5 of the Government Code).
132661.(a)On or before July 1, 2019, the authority shall provide a project feasibility report to the public, to be posted on the authoritys Internet Web site, on the plans for the development and implementation of transit connectivity in the Tri-Valley region. The report, at a minimum, shall include the following elements:
(1)Recommendations for expediting the development of cost-effective and responsive transit connectivity between BARTs rapid transit system and the Altamont Corridor Express commuter rail service in the Tri-Valley region.
(2)The identification of a preferred entity or entities to deliver transit connectivity, including the role each entity will play in planning, designing, financing, constructing, operating, maintaining, and the leasing, developing, or disposing of land, facilities, or equipment, necessary to deliver and operate transit connectivity.
(3)A funding plan describing any grants, loans, allocations, fund transfers, or awards of local, regional, state, federal, or private funds that are proposed to be made available for achieving transit connectivity.
(4)A description of any plan to finance the development of transit connectivity, including a description of any revenue source or sources to be pledged for financing, the duration of time to complete the financing, and the estimated total cost of financing.
(5)A proposed schedule for the completion of transit connectivity.
(6)A preliminary design for the project or projects to complete transit connectivity, including the identification of right-of-way, routes, stations, equipment, and any other facilities necessary to achieve transit connectivity.
(b)The authority may use any relevant environmental review documents previously completed by the Bay Area Rapid Transit District or the San Joaquin Regional Rail Commission to prepare the report specified in subdivision (a).
(c)Upon completion and approval by the authority of the project feasibility report required under subdivision (a), the authority shall submit the report to the Metropolitan Transportation Commission, the governing board of the Bay Area Rapid Transit District, the governing board of the San Joaquin Regional Rail Commission, the policy committees of each house of the Legislature with jurisdiction over transportation policy matters, and the Transportation Agency.
SEC. 4.(a)Nothing in this act is intended to disrupt or interrupt related environmental review processes underway at the Bay Area Rapid Transit District (BART) or the San Joaquin Regional Rail Commission, or to infringe upon the Bay Area Rapid Transit Districts process for planning, development, and delivery of a BART extension within the I-580 Corridor freeway alignment to the vicinity of the I-580/Isabel Avenue interchange, as identified in measures approved by the voters of Alameda County pursuant to Division 19 (commencing with Section 180000) of the Public Utilities Code.
(b)This section shall become inoperative on July 1, 2018, if the governing board of BART fails to adopt a preferred alternative for a BART extension within the I-580 Corridor freeway alignment to the vicinity of the I-580/Isabel Avenue interchange by June 30, 2018.
SEC. 5.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
The Legislature finds and declares all of the following:
(a)Commute patterns throughout northern California, and in particular through the Altamont Pass Corridor, traverse the boundaries of traditional metropolitan planning agencies. The Altamont Pass Corridor, located in the center of the Northern California Megaregion, connects the San Joaquin Valley to the Tri-Valley and is a vital node in the megaregions economic ecosystem as well as a key megaregion transportation route. Strategic and planned interregional mobility throughout the Altamont Pass Corridor is essential to sustained economic vitality in the megaregion.
(b)The Interstate 580 freeway serves the Altamont Pass Corridor and ranks as one of the most congested freeways in the megaregion during peak hours due to a high volume of regional and interregional commuter, freight, and recreational traffic. It is estimated that traffic on portions of Interstate 580 in this corridor will increase by up to 60 percent between 2013 and 2040.
(c)Connecting the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express, and providing expanded passenger rail connectivity between the San Joaquin Valley and the Bay Area, as recommended by the Metropolitan Transportation Commissions regional rail plan, would increase interregional mobility and provide much-needed highway capacity for expanded goods movement to the Bay Areas five seaports and the inland Port of Stockton. It would also relieve pressure on Interstate 580 and other transportation systems, given the large exponential population growth in the San Joaquin Valley.
(d)The Department of Finance projects that San Joaquin County, along with other counties in the San Joaquin Valley, will be among the fastest growing counties in the state. Between 1990 and 2013, the number of people commuting daily from the northern San Joaquin Valley to the Bay Area more than doubled, growing from 32,000 to nearly 65,000 commuters. This trend is expected to continue with the San Joaquin Valleys rapid population growth combined with the increasing high housing costs and strong job growth in the Bay Area.
(e)Because transportation is the major contributor to ozone precursors, increasing auto travel threatens improvement in air quality throughout the megaregion. Growing congestion will add to potential problems because of increased emissions of vehicles operating in stop-and-go traffic. Shifting commuters and other travelers to rail transportation between the San Joaquin Valley and the Bay Area is highly desirable as a means to partially offset the effects on air quality produced by the growth in auto travel.
(f)Taxpayers in Alameda County have voted to tax themselves to achieve expanded transit services to the Tri-Valley region.
(g)The State of California supports enhanced public transit services that improve connectivity between transit operators and provide seamless and convenient travel for public transit passengers.
SEC. 2.It is the intent of the Legislature to establish the Tri-Valley-San Joaquin Valley Regional Rail Authority to plan and help deliver a cost-effective connection from the San Joaquin Valley to the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express in the Tri-Valley, to address regional economic and transportation challenges.
SEC. 3.Chapter 8 (commencing with Section 132651) is added to Division 12.7 of the Public Utilities Code, to read:8. Tri-Valley-San Joaquin Valley Regional Rail Authority132651.As used in this chapter, the following terms have the following meanings:
(a)Authority means the Tri-Valley-San Joaquin Valley Regional Rail Authority created under this chapter.
(b)Bay Area Rapid Transit (BART) means the Bay Area Rapid Transit District.
(c)Board means the governing board of the authority.
(d)Connectivity means one or more projects necessary to achieve transit connectivity between BARTs rapid transit system and the San Joaquin Regional Rail Commissions Altamont Corridor Express commuter rail service, and to provide quality, seamless service to riders using the services operating between the Tri-Valley and the San Joaquin Valley.
(e)Tri-Valley means the Cities of Danville, Dublin, Livermore, Pleasanton, and San Ramon.
132652.The authority is hereby established for purposes of planning, developing, and delivering cost-effective and responsive transit connectivity, between BARTs rapid transit system and the Altamont Corridor Express commuter rail service in the Tri-Valley region of California, that reflects regional consensus and meets the goals and objectives of the San Joaquin Valley and Tri-Valley communities, consistent with the project feasibility report adopted pursuant to Section 132661.
132655.The governing board of the authority shall be composed of one representative from each of the following entities to be appointed by the governing board, mayor, or supervisor of each entity:
(a)The Bay Area Rapid Transit District.
(b)The City of Dublin.
(c)The City of Lathrop.
(d)The City of Livermore.
(e)The City of Manteca.
(f)The City of Pleasanton.
(g)The City of Stockton.
(h)The City of Tracy.
(i)The County of Alameda.
(j)The County of San Joaquin.
(k)The Livermore Amador Valley Transit Authority.
(l)The Mountain House Community Services District.
(m)The San Joaquin Regional Rail Commission.
(n)The City of Danville.
(o)The City of San Ramon.
132656.The authority has all of the powers necessary for planning, acquiring, leasing, developing, jointly developing, owning, controlling, using, jointly using, disposing of, designing, procuring, and constructing facilities to achieve transit connectivity, including, but not limited to, all of the following:
(a)Acceptance of grants, fees, allocations, and transfers of moneys from federal, state, and local agencies, including, but not limited to, moneys from local measures, as well as private entities.
(b)Acquiring, through purchase or through eminent domain proceedings, any property necessary for, incidental to, or convenient for, the exercise of the powers of the authority.
(c)Incurring indebtedness, secured by pledges of available revenue.
(d)Contracting with public and private entities for the planning, design, and construction of the connection. These contracts may be assigned separately or may be combined to include any or all tasks necessary to achieve transit connectivity.
(e)Entering into cooperative or joint development agreements with local governments or private entities necessary to achieve transit connectivity. These agreements may be entered into for purposes of sharing costs, selling or leasing land, air, or development rights, providing for the transferring of passengers, making pooling arrangements, or for any other purpose that is necessary for, incidental to, or convenient for the full exercise of the powers granted to the authority. For purposes of this paragraph, joint development includes, but is not limited to, an agreement with any person, firm, corporation, association, or organization for the operation of facilities or development of projects adjacent to, or physically or functionally related to, achieving transit connectivity.
(f)Relocation of utilities, as necessary to achieve transit connectivity.
132657.For an initial 18-month period, the Livermore Amador Valley Transit Authoritys administrative staff shall, if that authority has appointed a member to the board in accordance with Section 132655, provide all necessary administrative support to the board to perform its duties and responsibilities. At the conclusion of the initial period, the board may select the Livermore Amador Valley Transit Authority or the San Joaquin Regional Rail Commission to provide administrative support, or may alternatively hire an executive director for those functions. If an executive director is hired, the executive may appoint staff or retain consultants as necessary to carry out the duties of the authority.
132658.(a)The unencumbered balance of all local funds programmed for the completion of the BART Livermore extension or that have otherwise been identified for the connectivity shall be transferred to the authority and be considered resources available to effectuate the authoritys purposes pursuant to this chapter, except that local funds controlled by the Alameda County Transportation Commission to be used for completion of the BART Livermore extension or that have otherwise been identified for the connectivity shall continue to be programmed and allocated by the Alameda County Transportation Commission pursuant to measures approved by the voters of Alameda County pursuant to Division 19 (commencing with Section 180000).
(b)The unencumbered balance of all local funds programmed for the completion of the BART Livermore extension shall be transferred to the authority and be considered resources available to effectuate the authoritys purposes pursuant to this chapter, except that local funds controlled by the San Joaquin Regional Rail Commission that have otherwise been identified for connectivity shall continue to be programmed and allocated by the San Joaquin Regional Rail Commission pursuant to measures approved by the voters of San Joaquin County pursuant to Division 19 (commencing with Section 180000).
(c)The authority is eligible to apply for and receive state and federal funds to perform its duties pursuant to this chapter.
(d)The authority may pursue any and all sources of funding to achieve connectivity except that the authority shall not apply for funds available under the Transportation Development Act (Chapter 4 (commencing with Section 99200) of Part 11 of Division 10) for which any member entity of the authority may also be an applicant or for which any member entity of the authority is charged with approving applications for funding under that act, without the express written consent of that affected member entity.
132659.(a)The authority may enter into agreements with the Bay Area Rapid Transit District, the San Joaquin Regional Rail Commission, or any other entity to address any and all issues necessary to achieve transit connectivity, consistent with the project feasibility reports findings, conclusions, and recommendations adopted pursuant to Section 132661.
(b)If the project feasibility report includes a recommendation for an extension of BARTs rapid transit system, the governing board of the Bay Area Rapid Transit District shall have the authority to approve or deny the recommendation.
(c)If the project feasibility report includes a recommendation for an extension of the Altamont Corridor Express commuter rail service, the governing board of the San Joaquin Regional Rail Commission shall have the authority to approve or deny the recommendation.
132660.The authority and any entity contracted with to serve as the operator of any transit connectivity developed and delivered pursuant to this chapter shall be subject to all of the following:
(a)The Meyers-Milias-Brown Act (Chapter 10 (commencing with Section 3500) of Division 4 of Title 1 of the Government Code).
(b)The California Public Records Act (Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1 of the Government Code).
(c)The Ralph M. Brown Act (Chapter 9 (commencing with Section 54950) of Part 1 of Division 2 of Title 5 of the Government Code).
132661.(a)On or before July 1, 2019, the authority shall provide a project feasibility report to the public, to be posted on the authoritys Internet Web site, on the plans for the development and implementation of transit connectivity in the Tri-Valley region. The report, at a minimum, shall include the following elements:
(1)Recommendations for expediting the development of cost-effective and responsive transit connectivity between BARTs rapid transit system and the Altamont Corridor Express commuter rail service in the Tri-Valley region.
(2)The identification of a preferred entity or entities to deliver transit connectivity, including the role each entity will play in planning, designing, financing, constructing, operating, maintaining, and the leasing, developing, or disposing of land, facilities, or equipment, necessary to deliver and operate transit connectivity.
(3)A funding plan describing any grants, loans, allocations, fund transfers, or awards of local, regional, state, federal, or private funds that are proposed to be made available for achieving transit connectivity.
(4)A description of any plan to finance the development of transit connectivity, including a description of any revenue source or sources to be pledged for financing, the duration of time to complete the financing, and the estimated total cost of financing.
(5)A proposed schedule for the completion of transit connectivity.
(6)A preliminary design for the project or projects to complete transit connectivity, including the identification of right-of-way, routes, stations, equipment, and any other facilities necessary to achieve transit connectivity.
(b)The authority may use any relevant environmental review documents previously completed by the Bay Area Rapid Transit District or the San Joaquin Regional Rail Commission to prepare the report specified in subdivision (a).
(c)Upon completion and approval by the authority of the project feasibility report required under subdivision (a), the authority shall submit the report to the Metropolitan Transportation Commission, the governing board of the Bay Area Rapid Transit District, the governing board of the San Joaquin Regional Rail Commission, the policy committees of each house of the Legislature with jurisdiction over transportation policy matters, and the Transportation Agency.
SEC. 4.(a)Nothing in this act is intended to disrupt or interrupt related environmental review processes underway at the Bay Area Rapid Transit District (BART) or the San Joaquin Regional Rail Commission, or to infringe upon the Bay Area Rapid Transit Districts process for planning, development, and delivery of a BART extension within the I-580 Corridor freeway alignment to the vicinity of the I-580/Isabel Avenue interchange, as identified in measures approved by the voters of Alameda County pursuant to Division 19 (commencing with Section 180000) of the Public Utilities Code.
(b)This section shall become inoperative on July 1, 2018, if the governing board of BART fails to adopt a preferred alternative for a BART extension within the I-580 Corridor freeway alignment to the vicinity of the I-580/Isabel Avenue interchange by June 30, 2018.
SEC. 5.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
The Legislature finds and declares all of the following:
(a)Commute patterns throughout northern California, and in particular through the Altamont Pass Corridor, traverse the boundaries of traditional metropolitan planning agencies. The Altamont Pass Corridor, located in the center of the Northern California Megaregion, connects the San Joaquin Valley to the Tri-Valley and is a vital node in the megaregions economic ecosystem as well as a key megaregion transportation route. Strategic and planned interregional mobility throughout the Altamont Pass Corridor is essential to sustained economic vitality in the megaregion.
(b)The Interstate 580 freeway serves the Altamont Pass Corridor and ranks as one of the most congested freeways in the megaregion during peak hours due to a high volume of regional and interregional commuter, freight, and recreational traffic. It is estimated that traffic on portions of Interstate 580 in this corridor will increase by up to 60 percent between 2013 and 2040.
(c)Connecting the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express, and providing expanded passenger rail connectivity between the San Joaquin Valley and the Bay Area, as recommended by the Metropolitan Transportation Commissions regional rail plan, would increase interregional mobility and provide much-needed highway capacity for expanded goods movement to the Bay Areas five seaports and the inland Port of Stockton. It would also relieve pressure on Interstate 580 and other transportation systems, given the large exponential population growth in the San Joaquin Valley.
(d)The Department of Finance projects that San Joaquin County, along with other counties in the San Joaquin Valley, will be among the fastest growing counties in the state. Between 1990 and 2013, the number of people commuting daily from the northern San Joaquin Valley to the Bay Area more than doubled, growing from 32,000 to nearly 65,000 commuters. This trend is expected to continue with the San Joaquin Valleys rapid population growth combined with the increasing high housing costs and strong job growth in the Bay Area.
(e)Because transportation is the major contributor to ozone precursors, increasing auto travel threatens improvement in air quality throughout the megaregion. Growing congestion will add to potential problems because of increased emissions of vehicles operating in stop-and-go traffic. Shifting commuters and other travelers to rail transportation between the San Joaquin Valley and the Bay Area is highly desirable as a means to partially offset the effects on air quality produced by the growth in auto travel.
(f)Taxpayers in Alameda County have voted to tax themselves to achieve expanded transit services to the Tri-Valley region.
(g)The State of California supports enhanced public transit services that improve connectivity between transit operators and provide seamless and convenient travel for public transit passengers.
SEC. 2.It is the intent of the Legislature to establish the Tri-Valley-San Joaquin Valley Regional Construction Rail Authority to plan and help deliver a cost-effective connection from the San Joaquin Valley to the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express in the Tri-Valley, to address regional economic and transportation challenges.
SEC. 3.Chapter 8 (commencing with Section 132651) is added to Division 12.7 of the Public Utilities Code, to read:8. Tri-Valley-San Joaquin Valley Regional Construction Rail Authority132651.As used in this chapter, the following terms have the following meanings:
(a)Authority means the Tri-Valley-San Joaquin Valley Regional Construction Rail Authority created under this chapter.
(b)Bay Area Rapid Transit (BART) means the Bay Area Rapid Transit Districts rapid transit system. District.
(c)Board means the governing board of the authority.
(d)Connection means a connection between Bay Area Rapid Transit and the Altamont Corridor Express in the Tri-Valley.(d)Connectivity means one or more projects necessary to achieve transit connectivity between BARTs rapid transit system and the San Joaquin Regional Rail Commissions Altamont Corridor Express commuter rail service, and to provide quality, seamless service to riders using the services operating between the Tri-Valley and the San Joaquin Valley.
(e)Tri-Valley means the Cities of Danville, Dublin, Livermore, Pleasanton, and San Ramon.
132652.The authority is hereby established for purposes of planning, developing, and delivering a cost-effective and responsive connection that transit connectivity, between BARTs rapid transit system and the Altamont Corridor Express commuter rail service in the Tri-Valley region of California, that reflects regional consensus and meets the goals and objectives of the community. San Joaquin Valley and Tri-Valley communities, consistent with the project feasibility report adopted pursuant to Section 132661.
132655.The governing board of the authority shall be composed of one representative from each of the following entities to be appointed by the governing board, mayor, or supervisor of each entity:
(a)The Bay Area Rapid Transit District.
(b)The City of Dublin.
(c)The City of Lathrop.
(d)The City of Livermore.
(e)The City of Manteca.
(e)(f)The City of Pleasanton.
(f)(g)The City of Stockton.
(g)(h)The City of Tracy.
(h)(i)The County of Alameda.
(i)(j)The County of San Joaquin.
(j)(k)The Livermore Amador Valley Transit Authority.
(k)(l)The Mountain House Community Services District.
(l)(m)The San Joaquin Regional Rail Commission.
(n)The City of Danville.
(o)The City of San Ramon.
132656.The authority has all of the powers necessary for planning, acquiring, leasing, developing, jointly developing, owning, controlling, using, jointly using, disposing of, designing, procuring, and building the connection, constructing facilities to achieve transit connectivity, including, but not limited to, all of the following:
(a)Acceptance of grants, fees, allocations, and transfers of moneys from federal, state, and local agencies, including, but not limited to, moneys from local measures, as well as private entities.
(b)Acquiring, through purchase or through eminent domain proceedings, any property necessary for, incidental to, or convenient for, the exercise of the powers of the authority.
(c)Incurring indebtedness, secured by pledges of revenue available for the connection. available revenue.
(d)Contracting with public and private entities for the planning, design, and construction of the connection. These contracts may be assigned separately or may be combined to include any or all tasks necessary for completion of the connection. to achieve transit connectivity.
(e)Entering into cooperative or joint development agreements with local governments or private entities necessary for completion of the connection. to achieve transit connectivity. These agreements may be entered into for purposes of sharing costs, selling or leasing land, air, or development rights, providing for the transferring of passengers, making pooling arrangements, or for any other purpose that is necessary for, incidental to, or convenient for the full exercise of the powers granted to the authority. For purposes of this paragraph, joint development includes, but is not limited to, an agreement with any person, firm, corporation, association, or organization for the operation of facilities or development of projects adjacent to, or physically or functionally related to, the connection. achieving transit connectivity.
(f)Relocation of utilities, as necessary for completion of the connection. to achieve transit connectivity.
132657.For an initial one-year 18-month period, the Livermore Amador Valley Transit Authoritys administrative staff shall, if that authority has appointed a member to the board in accordance with Section 132655, provide all necessary administrative support to the board to perform its duties and responsibilities. At the conclusion of the initial period, the board may select the Livermore Amador Valley Transit Authority or the San Joaquin Regional Rail Commission to provide administrative support, or may alternatively hire an executive director for those functions. If an executive director is hired, the executive may appoint staff or retain consultants as necessary to carry out the duties of the authority.
132658.(a)The unencumbered balance of all local funds programmed for the completion of the BART Livermore extension or that have otherwise been identified for the connection connectivity shall be transferred to the authority for completion of the project. and be considered resources available to effectuate the authoritys purposes pursuant to this chapter, except that local funds controlled by the Alameda County Transportation Commission to be used for completion of the BART Livermore extension or that have otherwise been identified for the connectivity shall continue to be programmed and allocated by the Alameda County Transportation Commission pursuant to measures approved by the voters of Alameda County pursuant to Division 19 (commencing with Section 180000).
(b)The unencumbered balance of all local funds programmed for the completion of the BART Livermore extension shall be transferred to the authority and be considered resources available to effectuate the authoritys purposes pursuant to this chapter, except that local funds controlled by the San Joaquin Regional Rail Commission that have otherwise been identified for connectivity shall continue to be programmed and allocated by the San Joaquin Regional Rail Commission pursuant to measures approved by the voters of San Joaquin County pursuant to Division 19 (commencing with Section 180000).
(b)(c)The authority is eligible to apply for and receive state and federal funds for the connection. to perform its duties pursuant to this chapter.
(c)(d)The authority may pursue any and all sources of funding for the connection to achieve connectivity except that the authority shall not apply for funds available under the Transportation Development Act (Chapter 4 (commencing with Section 99200) of Part 11 of Division 10) for which any member entity of the authority may also be an applicant or for which any member entity of the authority is charged with approving applications for funding under that act, without the express written consent of that affected member entity.
132659.(a)If the project undertaken by the authority includes a BART extension, the authority and BART shall enter into a memorandum of understanding to address the ability of the Bay Area Rapid Transit District to review any significant changes in the scope of the design or construction, or both, of the project.(b)If the project undertaken by the authority includes a BART extension, the authority shall not encumber the project with any obligation that is transferable to the Bay Area Rapid Transit District upon completion of the project. The design and construction to be administered by the authority does not include rolling stock, which is a component of the operation of the project and which shall be administered by the Bay Area Rapid Transit District. This section does not apply to joint development programs authorized under paragraph (5) of subdivision (a) of Section 132656 that may be utilized by the authority to contribute to the financing of project design and construction for the connection.132660.(a)Upon completion of the connection, the operator shall be as follows:(1)If the connection is an extension of the BART system, the Bay Area Rapid Transit District shall assume responsibility for operating the extension.(2)To the extent the connection is not an extension of the BART system, the San Joaquin Regional Rail Commission or another rail authority shall be designated as the operator. Operation shall be contingent upon the approval of the commissions or other rail authoritys board of directors, as applicable.(b)Upon completion of the connection, all assets associated with the connection shall be transferred by the authority to the applicable operator, as determined in paragraph (2) of subdivision (a).132659.(a)The authority may enter into agreements with the Bay Area Rapid Transit District, the San Joaquin Regional Rail Commission, or any other entity to address any and all issues necessary to achieve transit connectivity, consistent with the project feasibility reports findings, conclusions, and recommendations adopted pursuant to Section 132661.
(b)If the project feasibility report includes a recommendation for an extension of BARTs rapid transit system, the governing board of the Bay Area Rapid Transit District shall have the authority to approve or deny the recommendation.
(c)If the project feasibility report includes a recommendation for an extension of the Altamont Corridor Express commuter rail service, the governing board of the San Joaquin Regional Rail Commission shall have the authority to approve or deny the recommendation.
132660.The authority and any entity contracted with to serve as the operator of any transit connectivity developed and delivered pursuant to this chapter shall be subject to all of the following:
(a)The Meyers-Milias-Brown Act (Chapter 10 (commencing with Section 3500) of Division 4 of Title 1 of the Government Code).
(b)The California Public Records Act (Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1 of the Government Code).
(c)The Ralph M. Brown Act (Chapter 9 (commencing with Section 54950) of Part 1 of Division 2 of Title 5 of the Government Code).
132661.(a)On or before July 1, 2018, and annually thereafter, 2019, the authority shall provide a project feasibility report to the public, to be posted on the authoritys Internet Web site, on the plans for the development and implementation of the connection. transit connectivity in the Tri-Valley region. The report, at a minimum, shall include project options with details, including the proposed scope, schedule, and cost of the connection. the following elements:
(1)Recommendations for expediting the development of cost-effective and responsive transit connectivity between BARTs rapid transit system and the Altamont Corridor Express commuter rail service in the Tri-Valley region.
(2)The identification of a preferred entity or entities to deliver transit connectivity, including the role each entity will play in planning, designing, financing, constructing, operating, maintaining, and the leasing, developing, or disposing of land, facilities, or equipment, necessary to deliver and operate transit connectivity.
(3)A funding plan describing any grants, loans, allocations, fund transfers, or awards of local, regional, state, federal, or private funds that are proposed to be made available for achieving transit connectivity.
(4)A description of any plan to finance the development of transit connectivity, including a description of any revenue source or sources to be pledged for financing, the duration of time to complete the financing, and the estimated total cost of financing.
(5)A proposed schedule for the completion of transit connectivity.
(6)A preliminary design for the project or projects to complete transit connectivity, including the identification of right-of-way, routes, stations, equipment, and any other facilities necessary to achieve transit connectivity.
(b)The authority may use any relevant environmental review documents previously completed by the Bay Area Rapid Transit District or the Altamont Corridor Express San Joaquin Regional Rail Commission to prepare the report specified in subdivision (a).
(c)Upon completion and approval by the authority of the project feasibility report required under subdivision (a), the authority shall submit the report to the Metropolitan Transportation Commission, the governing board of the Bay Area Rapid Transit District, the governing board of the San Joaquin Regional Rail Commission, the policy committees of each house of the Legislature with jurisdiction over transportation policy matters, and the Transportation Agency.
132662.The authority shall be dissolved upon the completion of the connection.SEC. 4.(a)Nothing in this act is intended to disrupt or interrupt related environmental review processes underway at the Bay Area Rapid Transit District (BART) or the San Joaquin Regional Rail Commission, or to infringe upon the Bay Area Rapid Transit Districts process for planning, development, and delivery of a BART extension within the I-580 Corridor freeway alignment to the vicinity of the I-580/Isabel Avenue interchange, as identified in measures approved by the voters of Alameda County pursuant to Division 19 (commencing with Section 180000) of the Public Utilities Code.
(b)This section shall become inoperative on July 1, 2018, if the governing board of BART fails to adopt a preferred alternative for a BART extension within the I-580 Corridor freeway alignment to the vicinity of the I-580/Isabel Avenue interchange by June 30, 2018.
SEC. 4.SEC. 5.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
The Legislature finds and declares all of the following:
(a)Commute patterns throughout northern California, and in particular through the Altamont Pass Corridor, traverse the boundaries of traditional metropolitan planning agencies. The Altamont Pass Corridor, located in the center of the Northern California Megaregion, connects the San Joaquin Valley to the Tri-Valley and is a vital node in the megaregions economic ecosystem as well as a key megaregion transportation route. Strategic and planned interregional mobility throughout the Altamont Pass Corridor is essential to sustained economic vitality in the megaregion.
(b)The Interstate 580 freeway serves the Altamont Pass Corridor and ranks as one of the most congested freeways in the megaregion during peak hours due to a high volume of regional and interregional commuter, freight, and recreational traffic. It is estimated that traffic on portions of Interstate 580 in this corridor will increase by up to 60 percent between 2013 and 2040.
(c)Connecting the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express, and providing expanded passenger rail connectivity between the San Joaquin Valley and the Bay Area, as recommended by the Metropolitan Transportation Commissions regional rail plan, would increase interregional mobility and provide much-needed highway capacity for expanded goods movement to the Bay Areas five seaports and the inland Port of Stockton. It would also relieve pressure on Interstate 580 and other transportation systems, given the large exponential population growth in the San Joaquin Valley.
(d)The Department of Finance projects that San Joaquin County, along with other counties in the San Joaquin Valley, will be among the fastest growing counties in the state. Between 1990 and 2013, the number of people commuting daily from the northern San Joaquin Valley to the Bay Area more than doubled, growing from 32,000 to nearly 65,000 commuters. This trend is expected to continue with the San Joaquin Valleys rapid population growth combined with the increasing high housing costs and strong job growth in the Bay Area.
(e)Because transportation is the major contributor to ozone precursors, increasing auto travel threatens improvement in air quality throughout the megaregion. Growing congestion will add to potential problems because of increased emissions of vehicles operating in stop-and-go traffic. Shifting commuters and other travelers to rail transportation between the San Joaquin Valley and the Bay Area is highly desirable as a means to partially offset the effects on air quality produced by the growth in auto travel.
SEC. 2.It is the intent of the Legislature to establish the Tri-Valley-San Joaquin Valley Regional Rail Construction Authority to plan and help deliver a cost-effective connection from the San Joaquin Valley to the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express in the Tri-Valley, to address regional economic and transportation challenges.
SEC. 3.Chapter 8 (commencing with Section 132651) is added to Division 12.7 of the Public Utilities Code, to read:8. Tri-Valley-San Joaquin Valley Regional Rail Construction Authority132651.As used in this chapter, the following terms have the following meanings:
(a)Authority means the Tri-Valley-San Joaquin Valley Regional Rail Construction Authority created under this chapter.
(b)Bay Area Rapid Transit (BART) means the Bay Area Rapid Transit Districts rapid transit system.
(c)Board means the governing board of the authority.
(d)Connection means a connection between Bay Area Rapid Transit and the Altamont Corridor Express in the Tri-Valley.
(e)Tri-Valley means the Cities of Danville, Livermore, Pleasanton, and San Ramon.
132652.The authority is hereby established for purposes of planning and developing planning, developing, and delivering a cost-effective and responsive connection that meets the goals and objectives of the community.
132655.The governing board of the authority shall be composed of one representative from each of the following entities to be appointed by the governing board, mayor, or supervisor of each entity:
(a)The Altamont Corridor Express.(b)(a)The Bay Area Rapid Transit District.
(c)(b)The City of Dublin.
(d)(c)The City of Lathrop.
(e)(d)The City of Livermore.
(f)(e)The City of Pleasanton.
(g)(f)The City of Stockton.
(h)(g)The City of Tracy.
(i)(h)The County of Alameda.
(j)(i)The County of San Joaquin.
(k)The East Bay Leadership Council.(l)Innovation Tri-Valley.(m)(j)The Livermore Amador Valley Transit Authority.
(n)San Joaquin Partnership.(k)The Mountain House Community Services District.
(l)The San Joaquin Regional Rail Commission.
132656.The authority has all of the powers necessary for planning, acquiring, leasing, developing, jointly developing, owning, controlling, using, jointly using, disposing of, designing, procuring, and building the connection, including, but not limited to, all of the following:
(a)Acceptance of grants, fees, allocations, and transfers of moneys from federal, state, and local agencies, including, but not limited to, moneys from local measures, as well as private entities.
(b)Acquiring, through purchase or through eminent domain proceedings, any property necessary for, incidental to, or convenient for, the exercise of the powers of the authority.
(c)Incurring indebtedness, secured by pledges of revenue available for the connection.
(d)Contracting with public and private entities for the planning, design, and construction of the connection. These contracts may be assigned separately or may be combined to include any or all tasks necessary for completion of the connection.
(e)Entering into cooperative or joint development agreements with local governments or private entities necessary for completion of the connection. These agreements may be entered into for purposes of sharing costs, selling or leasing land, air, or development rights, providing for the transferring of passengers, making pooling arrangements, or for any other purpose that is necessary for, incidental to, or convenient for the full exercise of the powers granted to the authority. For purposes of this paragraph, joint development includes, but is not limited to, an agreement with any person, firm, corporation, association, or organization for the operation of facilities or development of projects adjacent to, or physically or functionally related to, the connection.
(f)Relocation of utilities, as necessary for completion of the connection.
132657.The Livermore Amador Valley Transit Authority may enter into a memorandum of understanding with the San Joaquin Regional Rail Commission for necessary support of the authority. For an initial one-year period, the Livermore Amador Valley Transit Authoritys administrative staff shall, if that authority has appointed a member to the board in accordance with Section 132655, provide all necessary administrative support to the board to perform its duties and responsibilities and may perform for the board any and all activities that they are authorized to perform for the Livermore Amador Valley Transit Authority. responsibilities. At the conclusion of the initial period, the board may, through procedures that it determines, may select the Livermore Amador Valley Transit Authority, Authority or the San Joaquin Regional Rail Commission, or another existing public rail transit agency for one three-year term immediately following the initial period, and thereafter for five-year terms, Commission to provide all necessary administrative support staff to the board to perform its duties and responsibilities. support, or may alternatively hire an executive director for those functions. If an executive director is hired, the executive may appoint staff or retain consultants as necessary to carry out the duties of the authority.
132658.(a)The unencumbered balance of all local funds programmed for the completion of the BART Livermore extension or that have otherwise been identified for the connection shall be transferred to the authority for completion of the project.
(b)The authority is eligible to apply for and receive state and federal funds for the connection.
(c)The authority may pursue any and all sources of funding for the connection except that the authority shall not apply for funds available under the Transportation Development Act (Chapter 4 (commencing with Section 99200) of Part 11 of Division 10) for which any member entity of the authority may also be an applicant or for which any member entity of the authority is charged with approving applications for funding under that act, without the express written consent of that affected member entity.
132659.(a)If the project undertaken by the authority includes a BART extension, the authority and BART shall enter into a memorandum of understanding to address the ability of the Bay Area Rapid Transit District to review any significant changes in the scope of the design or construction, or both, of the project.
(b)If the project undertaken by the authority includes a BART extension, the authority shall not encumber the project with any obligation that is transferable to the Bay Area Rapid Transit District upon completion of the project. The design and construction to be administered by the authority does not include rolling stock, which is a component of the operation of the project and which shall be administered by the Bay Area Rapid Transit District. This section does not apply to joint development programs authorized under paragraph (5) of subdivision (a) of Section 132656 that may be utilized by the authority to contribute to the financing of project design and construction for the connection.
132660.(a)Upon completion of the connection, the operator shall be as follows:
(1)If the connection is an extension of the BART system, the Bay Area Rapid Transit District shall assume responsibility for operating the extension.
(2)To the extent the connection is not an extension of the BART system, the San Joaquin Regional Rail Commission or another rail authority shall be designated as the operator. Operation shall be contingent upon the approval of the commissions or other rail authoritys board of directors, as applicable.
(b)Upon completion of the connection, all assets associated with the connection shall be transferred by the authority to the applicable operator, as determined in paragraph (2) of subdivision (a).
132658.On132661.(a)On or before July 1, 2018, and annually thereafter, the authority shall provide a project feasibility report to the public, to be posted on the authoritys Internet Web site, on the plans for the development and implementation of the connection. The report, at a minimum, shall include project options with details, including the proposed scope, schedule, and cost of the connection.
(b)The authority may use any environmental review documents previously completed by the Bay Area Rapid Transit District or the Altamont Corridor Express to prepare the report specified in subdivision (a).
132659.132662.The authority shall be dissolved upon the completion of the connection.
SEC. 4.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
The Legislature finds and declares all of the following:
(a)Commute patterns throughout northern California, and in particular through the Altamont Pass Corridor, traverse the boundaries of traditional metropolitan planning agencies. The Altamont Pass Corridor, located in the center of the Northern California Megaregion, connects the San Joaquin Valley to the Tri-Valley and is a vital node in the megaregions economic ecosystem as well as a key megaregion transportation route. Strategic and planned interregional mobility throughout the Altamont Pass Corridor is essential to sustained economic vitality in the megaregion.
(b)The Interstate 580 freeway serves the Altamont Pass Corridor and ranks as one of the most congested freeways in the megaregion during peak hours due to a high volume of regional and interregional commuter, freight, and recreational traffic. It is estimated that traffic on portions of Interstate 580 in this corridor will increase by up to 60 percent between 2013 and 2040.
(c)Connecting the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express, and providing expanded passenger rail connectivity between the San Joaquin Valley and the Bay Area, as recommended by the Metropolitan Transportation Commissions regional rail plan, would increase interregional mobility and provide much-needed highway capacity for expanded goods movement to the Bay Areas five seaports and the inland Port of Stockton. It would also relieve pressure on Interstate 580 and other transportation systems, given the large exponential population growth in the San Joaquin Valley.
(d)The Department of Finance projects that San Joaquin County, along with other counties in the San Joaquin Valley, will be among the fastest growing counties in the state. Between 1990 and 2013, the number of people commuting daily from the northern San Joaquin Valley to the Bay Area more than doubled, growing from 32,000 to nearly 65,000 commuters. This trend is expected to continue with the San Joaquin Valleys rapid population growth combined with the increasing high housing costs and strong job growth in the Bay Area.
(e)Because transportation is the major contributor to ozone precursors, increasing auto travel threatens improvement in air quality throughout the megaregion. Growing congestion will add to potential problems because of increased emissions of vehicles operating in stop-and-go traffic. Shifting commuters and other travelers to rail transportation between the San Joaquin Valley and the Bay Area is highly desirable as a means to partially offset the effects on air quality produced by the growth in auto travel.
SEC. 2.It is the intent of the Legislature to establish the Tri-Valley-San Joaquin Valley Regional Rail Authority to plan and help deliver a cost effective and responsive rail extension that connects cost-effective connection from the San Joaquin Valley to the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express in the Tri-Valley, to address regional economic and transportation challenges.
SEC. 3.Chapter 8 (commencing with Section 132651) is added to Division 12.7 of the Public Utilities Code, to read:8. Tri-Valley-San Joaquin Valley Regional Rail Authority132651.As used in this chapter, the following terms have the following meanings:
(a)Authority means the Tri-Valley-San Joaquin Valley Regional Rail Authority created under this chapter.
(b)Bay Area Rapid Transit means the Bay Area Rapid Transit Districts rapid transit system.
(c)Board means the governing board of the authority.
(d)Connection means an interregional rail a connection between Bay Area Rapid Transit and the Altamont Corridor Express in the Tri-Valley.
(e)Phase 1 Project means the first phase of the connection, which will extend Bay Area Rapid Transit along Interstate 580 to a new station in the vicinity of the Isabel Avenue interchange in the City of Livermore.132652.The authority is hereby established for purposes of planning and delivering developing a cost-effective and responsive connection that meets the goals and objectives of the community.
132653.On or before July 1, 2018, the board shall publish a management, finance, and implementation plan relating to the connection.132655.The governing board of the authority shall be composed of one representative from each of the following entities to be appointed by the governing board, mayor, or supervisor of each entity:
(a)The Altamont Corridor Express.
(b)The Bay Area Rapid Transit District.
(c)The City of Dublin.
(d)The City of Lathrop.
(e)The City of Livermore.
(f)The City of Pleasanton.
(g)The City of Stockton.
(h)The City of Tracy.
(i)The County of Alameda.
(j)The County of San Joaquin.
(k)The East Bay Leadership Council.
(l)Innovation Tri-Valley.
(m)The Livermore Amador Valley Transit Authority.
(n)San Joaquin Partnership.
132660.(a)The board may appoint an executive director to serve at the pleasure of the board.(b)The executive director is exempt from all civil service laws and shall be paid a salary established by the board.(c)The executive director may appoint staff or retain consultants as necessary to carry out the duties of the authority.(d)All contracts approved and awarded by the executive director shall be awarded in accordance with state and federal laws relating to procurement. Awards shall be based on price or competitive negotiation, or on both of those things.132665.132657.The Livermore Amador Valley Transit Authority shall may enter into a memorandum of understanding with the San Joaquin Regional Rail Commission to comanage the rail-specific elements necessary to for necessary support of the authority. For an initial one-year period, the Livermore Amador Valley Transit Authoritys administrative staff shall, if that authority has appointed a member to the board in accordance with Section 132655, provide all necessary administrative support to the board to perform its duties and responsibilities and may perform for the board any and all activities that they are authorized to perform for the Livermore Amador Valley Transit Authority. At the conclusion of the initial period, the board may, through procedures that it determines, select the Livermore Amador Valley Transit Authority, San Joaquin Regional Rail Commission, or another existing public rail transit agency for one three-year term immediately following the initial period, and thereafter for five-year terms, to provide all necessary administrative support staff to the board to perform its duties and responsibilities.
132670.The Bay Area Rapid Transit District shall identify and expeditiously enter into an agreement with the authority to hold in trust for the authority all real and personal property and any other assets accumulated in the planning, environmental review, design, right-of-way acquisition, permitting, and construction of the connection, including, but not limited to, rights-of-way, documents, interim work products, studies, third-party agreements, contracts, and design documents, as necessary for completion of the connection.132675.All unencumbered moneys dedicated for the completion of the Phase 1 Project or the connection shall be transferred to the authority for the completion of the connection.132680.The authority shall not be responsible for any core system upgrades that preexist its establishment. This includes both existing core system deficiencies necessary to support planned service frequency upgrades and any core system upgrades needed to support prior system expansions, including, but not limited to, the Silicon Valley rapid transit corridor.132685.Upon the completion of the connection or any phase of the connection, the Bay Area Rapid Transit District shall assume ownership of all physical improvements constructed for that phase or the connection, and shall assume operational control, maintenance responsibilities, and related financial obligations of the phase or connection.132690.(a)The authority has all of the powers necessary for planning, acquiring, leasing, developing, jointly developing, owning, controlling, using, jointly using, disposing of, designing, procuring, and building the Phase 1 Project and connection, including, but not limited to, all of the following:(1)Acceptance of grants, fees, allocations, and transfers of moneys from federal, state, and local agencies, including, but not limited to, moneys from local measures, as well as private entities.(2)Acquiring, through purchase or through eminent domain proceedings, any property necessary for, incidental to, or convenient for, the exercise of the powers of the authority.(3)Incurring indebtedness, secured by pledges of revenue available for the Phase 1 Project or connection completion.(4)Contracting with public and private entities for the planning, design, and construction of the connection. These contracts may be assigned separately or may be combined to include any or all tasks necessary for completion of the Phase 1 Project or connection.(5)Entering into cooperative or joint development agreements with local governments or private entities. These agreements may be entered into for purposes of sharing costs, selling or leasing land, air, or development rights, providing for the transferring of passengers, making pooling arrangements, or for any other purpose that is necessary for, incidental to, or convenient for the full exercise of the powers granted to the authority. For purposes of this paragraph, joint development includes, but is not limited to, an agreement with any person, firm, corporation, association, or organization for the operation of facilities or development of projects adjacent to, or physically or functionally related to, the Phase 1 Project or connection.(6)Relocation of utilities, as necessary for completion of the connection.(7)Conducting all necessary environmental reviews, including, but not limited to, completing environmental impact reports.(b)The duties of the authority include, but are not limited to, both of the following:(1)Conducting the financial studies and the planning and engineering necessary for completion of the Phase 1 Project and connection. Although this duty rests solely on the authority, the authority may exercise any of the powers described in subdivision (a) to fulfill this duty.(2)Adoption of an administrative code, not later than July 1, 2018, for administration of the authority in accordance with any applicable laws, including, but not limited to, the Ralph M. Brown Act (Chapter 9 (commencing with Section 54950) of Part 1 of Division 2 of Title 5 of the Government Code), the provisions of this chapter, laws generally applicable to local agency procurement and contracts, laws relating to contracting goals for small disadvantaged business enterprise and disabled veteran business enterprise participation, and the Political Reform Act of 1974 (Title 9 (commencing with Section 81000) of the Government Code).132694.The authority shall enter into a memorandum of understanding with the Bay Area Rapid Transit District that shall address the ability of the Bay Area Rapid Transit District to review any significant changes in the scope of the design or construction, or both design and construction, of the Phase 1 Project and connection.132695.The Department of Transportation shall expedite reviews and requests related to the Phase 1 Project or connection and shall provide responses within 60 days.132697.132658.On or before July 1, 2018, and annually thereafter, the authority shall provide a project update feasibility report to the public, to be posted on the authoritys Internet Web site, on the plans for the development and implementation of the Phase 1 Project and connection. The report, at a minimum, shall include a project summary, as well as details by phase, with all information necessary to clearly describe the status of the phase, including, but not limited to, all of the following: options with details, including the proposed scope, schedule, and cost of the connection.
(a)A summary describing the overall progress of the phase.(b)The baseline budget for all phase costs, by segment or contract.(c)The current and projected budget, by segment or contract, for all phase costs.(d)Expenditures to date, by segment or contract, for all phase costs.(e)A summary of milestones achieved during the prior year and milestones expected to be reached in the coming year.(f)Any issues identified during the prior year and actions taken to address those issues.(g)A thorough discussion of risks to the project and steps taken to mitigate those risks.132699.132659.The authority shall be dissolved upon both the completion of the connection and the assumption by Bay Area Rapid Transit District of operational control of the connection as provided in Section 132685. connection.
SEC. 4.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
The Legislature finds and declares all of the following:
(a)Commute patterns throughout northern California, and in particular through the Altamont Pass Corridor, traverse the boundaries of traditional metropolitan planning agencies. The Altamont Pass Corridor, located in the center of the Northern California Megaregion, connects the San Joaquin Valley to the Tri-Valley and is a vital node in the megaregions economic ecosystem as well as a key megaregion transportation route. Strategic and planned interregional mobility throughout the Altamont Pass Corridor is essential to sustained economic vitality in the megaregion.
(b)The Interstate 580 freeway serves the Altamont Pass Corridor and ranks as one of the most congested freeways in the megaregion during peak hours due to a high volume of regional and interregional commuter, freight, and recreational traffic. It is estimated that traffic on portions of Interstate 580 in this corridor will increase by up to 60 percent between 2013 and 2040.
(c)Connecting the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express, and providing expanded passenger rail connectivity between the San Joaquin Valley and the Bay Area, as recommended by the Metropolitan Transportation Commissions regional rail plan, would increase interregional mobility and provide much-needed highway capacity for expanded goods movement to the Bay Areas five seaports and the inland Port of Stockton. It would also relieve pressure on Interstate 580 and other transportation systems, given the large exponential population growth in the San Joaquin Valley.
(d)The Department of Finance projects that San Joaquin County, along with other counties in the San Joaquin Valley, will be among the fastest growing counties in the state. Between 1990 and 2013, the number of people commuting daily from the northern San Joaquin Valley to the Bay Area more than doubled, growing from 32,000 to nearly 65,000 commuters. This trend is expected to continue with the San Joaquin Valleys rapid population growth combined with the increasing high housing costs and strong job growth in the Bay Area.
(e)Because transportation is the major contributor to ozone precursors, increasing auto travel threatens improvement in air quality throughout the megaregion. Growing congestion will add to potential problems because of increased emissions of vehicles operating in stop-and-go traffic. Shifting commuters and other travelers to rail transportation between the San Joaquin Valley and the Bay Area is highly desirable as a means to partially offset the effects on air quality produced by the growth in auto travel.
SEC. 2.It is the intent of the Legislature to establish the Tri-Valley-San Joaquin Valley Regional Rail Authority to plan and deliver a cost effective and responsive rail extension that connects the San Joaquin Valley to the Bay Area Rapid Transit Districts rapid transit system and the Altamont Corridor Express in the Tri-Valley, to address regional economic and transportation challenges.
SEC. 3.Chapter 8 (commencing with Section 132651) is added to Division 12.7 of the Public Utilities Code, to read:8. Tri-Valley-San Joaquin Valley Regional Rail Authority132651.As used in this chapter, the following terms have the following meanings:
(a)Authority means the Tri-Valley-San Joaquin Valley Regional Rail Authority created under this chapter.
(b)Bay Area Rapid Transit means the Bay Area Rapid Transit Districts rapid transit system.
(c)Board means the governing board of the authority.
(d)Connection means an interregional rail connection between Bay Area Rapid Transit and the Altamont Corridor Express in the Tri-Valley.
(e)Phase 1 Project means the first phase of the connection, which will extend Bay Area Rapid Transit along Interstate 580 to a new station in the vicinity of the Isabel Avenue interchange in the City of Livermore.
132652.The authority is hereby established for purposes of planning and delivering a cost-effective and responsive connection that meets the goals and objectives of the community.
132653.On or before July 1, 2018, the board shall publish a management, finance, and implementation plan relating to the connection.
132655.The governing board of the authority shall be composed of one representative from each of the following entities to be appointed by the governing board, mayor, or supervisor of each entity:
(a)The Altamont Corridor Express.
(b)The Bay Area Rapid Transit District.
(c)The City of Dublin.
(d)The City of Lathrop.
(e)The City of Livermore.
(f)The City of Pleasanton.
(g)The City of Stockton.
(h)The City of Tracy.
(i)The County of Alameda.
(j)The County of San Joaquin.
(k)The East Bay Leadership Council.
(l)Innovation Tri-Valley.
(m)The Livermore Amador Valley Transit Authority.
(n)San Joaquin Partnership.
132660.(a)The board may appoint an executive director to serve at the pleasure of the board.
(b)The executive director is exempt from all civil service laws and shall be paid a salary established by the board.
(c)The executive director may appoint staff or retain consultants as necessary to carry out the duties of the authority.
(d)All contracts approved and awarded by the executive director shall be awarded in accordance with state and federal laws relating to procurement. Awards shall be based on price or competitive negotiation, or on both of those things.
132665.The Livermore Amador Valley Transit Authority shall enter into a memorandum of understanding with the San Joaquin Regional Rail Commission to comanage the rail-specific elements necessary to support the authority. For an initial one-year period, the Livermore Amador Valley Transit Authoritys administrative staff shall, if that authority has appointed a member to the board in accordance with Section 132655, provide all necessary administrative support to the board to perform its duties and responsibilities and may perform for the board any and all activities that they are authorized to perform for the Livermore Amador Valley Transit Authority. At the conclusion of the initial period, the board may, through procedures that it determines, select the Livermore Amador Valley Transit Authority, San Joaquin Regional Rail Commission, or another existing public rail transit agency for one three-year term immediately following the initial period, and thereafter for five-year terms, to provide all necessary administrative support staff to the board to perform its duties and responsibilities.
132670.The Bay Area Rapid Transit District shall identify and expeditiously enter into an agreement with the authority to hold in trust for the authority all real and personal property and any other assets accumulated in the planning, environmental review, design, right-of-way acquisition, permitting, and construction of the connection, including, but not limited to, rights-of-way, documents, interim work products, studies, third-party agreements, contracts, and design documents, as necessary for completion of the connection.
132675.All unencumbered moneys dedicated for the completion of the Phase 1 Project or the connection shall be transferred to the authority for the completion of the connection.
132680.The authority shall not be responsible for any core system upgrades that preexist its establishment. This includes both existing core system deficiencies necessary to support planned service frequency upgrades and any core system upgrades needed to support prior system expansions, including, but not limited to, the Silicon Valley rapid transit corridor.
132685.Upon the completion of the connection or any phase of the connection, the Bay Area Rapid Transit District shall assume ownership of all physical improvements constructed for that phase or the connection, and shall assume operational control, maintenance responsibilities, and related financial obligations of the phase or connection.
132690.(a)The authority has all of the powers necessary for planning, acquiring, leasing, developing, jointly developing, owning, controlling, using, jointly using, disposing of, designing, procuring, and building the Phase 1 Project and connection, including, but not limited to, all of the following:
(1)Acceptance of grants, fees, allocations, and transfers of moneys from federal, state, and local agencies, including, but not limited to, moneys from local measures, as well as private entities.
(2)Acquiring, through purchase or through eminent domain proceedings, any property necessary for, incidental to, or convenient for, the exercise of the powers of the authority.
(3)Incurring indebtedness, secured by pledges of revenue available for the Phase 1 Project or connection completion.
(4)Contracting with public and private entities for the planning, design, and construction of the connection. These contracts may be assigned separately or may be combined to include any or all tasks necessary for completion of the Phase 1 Project or connection.
(5)Entering into cooperative or joint development agreements with local governments or private entities. These agreements may be entered into for purposes of sharing costs, selling or leasing land, air, or development rights, providing for the transferring of passengers, making pooling arrangements, or for any other purpose that is necessary for, incidental to, or convenient for the full exercise of the powers granted to the authority. For purposes of this paragraph, joint development includes, but is not limited to, an agreement with any person, firm, corporation, association, or organization for the operation of facilities or development of projects adjacent to, or physically or functionally related to, the Phase 1 Project or connection.
(6)Relocation of utilities, as necessary for completion of the connection.
(7)Conducting all necessary environmental reviews, including, but not limited to, completing environmental impact reports.
(b)The duties of the authority include, but are not limited to, both of the following:
(1)Conducting the financial studies and the planning and engineering necessary for completion of the Phase 1 Project and connection. Although this duty rests solely on the authority, the authority may exercise any of the powers described in subdivision (a) to fulfill this duty.
(2)Adoption of an administrative code, not later than July 1, 2018, for administration of the authority in accordance with any applicable laws, including, but not limited to, the Ralph M. Brown Act (Chapter 9 (commencing with Section 54950) of Part 1 of Division 2 of Title 5 of the Government Code), the provisions of this chapter, laws generally applicable to local agency procurement and contracts, laws relating to contracting goals for small disadvantaged business enterprise and disabled veteran business enterprise participation, and the Political Reform Act of 1974 (Title 9 (commencing with Section 81000) of the Government Code).
132694.The authority shall enter into a memorandum of understanding with the Bay Area Rapid Transit District that shall address the ability of the Bay Area Rapid Transit District to review any significant changes in the scope of the design or construction, or both design and construction, of the Phase 1 Project and connection.
132695.The Department of Transportation shall expedite reviews and requests related to the Phase 1 Project or connection and shall provide responses within 60 days.
132697.On or before July 1, 2018, and annually thereafter, the authority shall provide a project update report to the public, to be posted on the authoritys Internet Web site, on the development and implementation of the Phase 1 Project and connection. The report, at a minimum, shall include a project summary, as well as details by phase, with all information necessary to clearly describe the status of the phase, including, but not limited to, all of the following:
(a)A summary describing the overall progress of the phase.
(b)The baseline budget for all phase costs, by segment or contract.
(c)The current and projected budget, by segment or contract, for all phase costs.
(d)Expenditures to date, by segment or contract, for all phase costs.
(e)A summary of milestones achieved during the prior year and milestones expected to be reached in the coming year.
(f)Any issues identified during the prior year and actions taken to address those issues.
(g)A thorough discussion of risks to the project and steps taken to mitigate those risks.
132699.The authority shall be dissolved upon both the completion of the connection and the assumption by Bay Area Rapid Transit District of operational control of the connection as provided in Section 132685.
SEC. 4.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
SECTION 1.Section 5431 of the Public Utilities Code is amended to read:5431.For purposes of this article, the following terms have the following meanings:(a)Participating driver or driver means a person who uses a vehicle in connection with a transportation network companys online-enabled application or platform to connect with passengers.(b)Personal vehicle means a vehicle that is used by a participating driver to provide prearranged transportation services for compensation that meets all of the following requirements:(1)Has a passenger capacity of eight persons or less, including the driver.(2)Is owned, leased, rented for a term that does not exceed 30 days, or otherwise authorized for use by the participating driver.(3)Meets all inspection and other safety requirements imposed by the commission.(4)Is not a taxicab or limousine.(c)Transportation network company means an organization, including, but not limited to, a corporation, limited liability company, partnership, sole proprietor, or any other entity, operating in California that provides prearranged transportation services for compensation using an online-enabled application or platform to connect passengers with drivers using a personal vehicle.(d)Transportation network company insurance means a liability insurance policy that specifically covers liabilities arising from a drivers use of a vehicle in connection with a transportation network companys online-enabled application or platform.For purposes of this article, the following terms have the following meanings:
(a)Participating driver or driver means any a person who uses a vehicle in connection with a transportation network companys online-enabled application or platform to connect with passengers.
(b)Personal vehicle means a vehicle that is used by a participating driver to provide prearranged transportation services for compensation that meets all of the following requirements:
(1)Has a passenger capacity of eight persons or less, including the driver.
(2)Is owned, leased, rented for a term that does not exceed 30 days, or otherwise authorized for use by the participating driver.
(3)Meets all inspection and other safety requirements imposed by the commission.
(4)Is not a taxicab or limousine.
(c)Transportation network company means an organization, including, but not limited to, a corporation, limited liability company, partnership, sole proprietor, or any other entity, operating in California that provides prearranged transportation services for compensation using an online-enabled application or platform to connect passengers with drivers using a personal vehicle.
(d)Transportation network company insurance means a liability insurance policy that specifically covers liabilities arising from a drivers use of a vehicle in connection with a transportation network companys online-enabled application or platform.
|
Date
|
Status
|
|---|---|
| Oct 13, 2017 | Chaptered by Secretary of State - Chapter 747, Statutes of 2017. |
| Oct 13, 2017 | Approved by the Governor. |
| Sep 27, 2017 | Enrolled and presented to the Governor at 4 p.m. |
| Sep 16, 2017 | Assembly Rule 63 suspended. |
| Sep 16, 2017 | Assembly Rule 63 suspended. (Page 3535.) |
| Sep 15, 2017 | In Assembly. Concurrence in Senate amendments pending. |
| Sep 15, 2017 | Read third time. Passed. Ordered to the Assembly. |
| Sep 15, 2017 | From committee: Do pass. (Ayes 7. Noes 0.) (September 15). |
| Sep 13, 2017 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 11. Noes 1.) (September 13). Re-referred to Com. on APPR. |
| Sep 12, 2017 | Joint Rules 61 and 62 suspended. |
| Sep 8, 2017 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on T. & H. |
| Jul 10, 2017 | In committee: Set, first hearing. Hearing canceled at the request of author. |
| Jul 5, 2017 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on T. & H. |
| Jun 14, 2017 | Referred to Com. on T. & H. |
| Jun 5, 2017 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Jun 1, 2017 | Read third time. Passed. Ordered to the Senate. (Ayes 72. Noes 0. Page 2044.) |
| May 26, 2017 | From committee: Do pass. (Ayes 17. Noes 0.) (May 26). |
| May 3, 2017 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| Apr 25, 2017 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 14. Noes 0.) (April 24). Re-referred to Com. on APPR. |
| Apr 19, 2017 | Re-referred to Com. on TRANS. |
| Apr 18, 2017 | From committee chair, with author's amendments: Amend, and re-refer to Com. on TRANS. Read second time and amended. |
| Mar 22, 2017 | Re-referred to Com. on TRANS. |
| Mar 21, 2017 | From committee chair, with author's amendments: Amend, and re-refer to Com. on TRANS. Read second time and amended. |
| Mar 20, 2017 | Referred to Com. on TRANS. |
| Feb 16, 2017 | From printer. May be heard in committee March 18. |
| Feb 15, 2017 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 16, 2017 | AB 758 EGGMAN Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Sep 15, 2017 | Assembly 3rd Reading AB758 Eggman et al. By Beall | Senate Floor |
Passed |
|
| Sep 15, 2017 | Do pass | Senate Standing Committee on Appropriations |
Passed |
|
| Sep 13, 2017 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Transportation and Housing |
Passed |
|
| Jun 1, 2017 | AB 758 EGGMAN Assembly Third Reading | Assembly Floor |
Passed |
|
| May 26, 2017 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 24, 2017 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Transportation |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
(Without Reference to File)
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 758
Author:(Eggman and Baker)
As Amended Ver:September 8, 2017
Majority vote
ASSEMBLY: | 72-0 | (June 1, 2017) | SENATE: | 36-1 | (September 15, 2017) |
Original Committee Reference: TRANS.
SUMMARY: Creates the Tri-Valley-San Joaquin Valley Regional Rail Authority (Authority) to oversee the planning, development, and delivery of a connection between the Bay Area Rapid Transit (BART) and the Altamont Corridor Express (ACE) in the Tri-Valley region.
The Senate amendments:
- Add findings and declarations regarding the commitment of Alameda County taxpayers to expanded transit service in the Tri-Valley region and the State of California's support for public transit connectivity.
- Define "connectivity" to mean one or more projects to achieve transit connectivity between BART and ACE, and define "Tri-Valley" to mean the Cities of Danville, Dublin, Livermore, Pleasanton, and San Ramon.
- Expand the purposes of the newly created Authority to included delivery of transit connectivity between BART and ACE.
- Define the powers of the new Authority to include:
- Acceptance of funds from federal, state, and local governments and private entities;
- Acquisition of property through purchase or eminent domain;
- Incur indebtedness;
- Contract with public and private entities for the planning, design, and construction of the connection;
- Enter into cooperative or joint development agreements, as defined, with local governments or private entities for the purposes of sharing costs; and selling or leasing land, air or development rights; and,
- Relocation of utilities.
- Require the Livermore Amador Transit Authority (LAVTA) to provide administrative support to the Authority for 18 months instead of one year, and authorizes the Authority to hire an executive director who may in turn hire staff or consultants.
- Transfer all unencumbered locals funds programmed for the BART Livermore extension project or connectivity of ACE and BART to the Authority for their use. Retain programming and allocation control of its respective funds for the Alameda County Transportation Commission and the San Joaquin Regional Rail Commission (SJRRC) pursuant to their local sales tax measures.
- Authorize the Authority to pursue state and federal funding, except for funding from the Transportation Development Act, without express written consent from a member entity on the Authority.
- Require the Authority to develop one project feasibility report by July 1, 2019, instead of annually starting in 2018. Require the report to include: recommendations for expediting the BART to Ace connection; identification of a preferred entity to deliver transit connectivity, as defined; a funding plan; a description of any financing plan; a proposed schedule for completion; and a preliminary design for the project or projects to complete transit connectivity.
- Authorize the Authority to enter into agreements with BART and SJRRC necessary to achieve transit connectivity consistent with the required project feasibility report.
- Authorize the governing bodies of BART or ACE to approve or deny a recommendation of expansion of their respective systems in the project feasibility report.
- Allow the Authority to utilize any relevant environmental review documents completed by BART or ACE to prepare the report, and the report must be submitted to the Metropolitan Transportation Commission, BART, SJRRC and Legislature's transportation committees, and the California State Transportation Agency.
- Clarify that the bill will not disrupt or interrupt any related environmental review processes underway by BART or ACE, specifically the Livermore extension; however, the section becomes inoperative on July 1, 2018, if BART fails to adopt a preferred alternative for the BART extension to Livermore.
- Require the Authority and any entity contracted to operate any transit system delivered to achieve connectivity to follow public meetings and public records requirements, as defined.
- Authorize the Commission on State Mandates to reimburse local governments and school districts for any approved state mandated costs.
AS PASSED BY THE ASSEMBLY, this bill:
- Made legislative findings and declarations regarding:
- The need for strategic and planned interregional mobility in the Altamont Pass corridor;
- The benefits of connecting the BART District's rapid transit system and ACE to increase interregional mobility, provide much-needed highway capacity for expanded goods movement to the bay area's five seaports, and relieve pressure on Interstate 580 (I-580), given the projected population growth in the Central Valley;
- The growing congestion in the corridor adding to emissions, and shifting commuters to rail transportation between the San Joaquin Valley and the Bay Area is highly desirable to help offset the effects on air quality produced by growth in auto travel.
- The intent of the Legislature to establish the Authority to plan and help deliver a cost-effective connection of BART and ACE in the Tri-Valley to address regional economic and transportation challenges.
- Defined key terms, including, "Authority" to mean the Tri-Valley-San Joaquin Valley Regional Rail Authority; and, "Connection" to mean a connection between BART and ACE in the Tri-Valley.
- Established the Authority for purposes of planning and developing a cost-effective and responsive connection that meets the goals and objectives of the community; and prescribed the Authority's membership, to be composed of one representative; from each of the following entities: ACE; BART; the City of Dublin; the City of Lathrop; the City of Livermore; the City of Pleasanton; the City of Stockton; the City of Tracy; the County of Alameda; the County of San Joaquin; the East Bay Leadership Council; Innovation Tri-Valley; LAVTA; and San Joaquin Partnership.
- Provided for administrative support for the Authority, and authorized the Authority to partner with LAVTA and the San Joaquin Regional Rail Commission.
- Required the Authority, by July 1, 2018, to provide a project feasibility report to the public and post on its website, detailing the plans for the development and implementation of the connection, including proposed scope, schedule and cost.
- Directed the Authority to dissolve upon completion of the connection.
FISCAL EFFECT: According to the Senate Appropriations Committee, unknown, potentially reimbursable mandate costs related to the requirement that the LAVTA provide interim administrative support to the Authority for the production of the feasibility report, and for other duties and responsibilities. Additional, but likely minor reimbursable mandate costs related to the participation by local agency representatives on the Authority's governing board.
COMMENTS: The Altamont Pass serves as the commuter corridor connecting the San Joaquin Valley to the Bay Area. I-580 is the freeway connector and ranks as of one of the most congested freeways in the mega-region during peak hours due to high volume of regional and interregional commuter, freight, and recreational traffic. Currently, the ACE train brings commuters from the northern San Joaquin Valley from the cities of Stockton, Lathrop and Tracy to the Bay Area. ACE carries nearly 3,000 commuters daily one way or 6,000 round trips.
According to the author, this mega-region, the San Joaquin Valley and Bay Area, represents an important economic region as well as a critical transportation route with roughly 207,000 weekday trips that originated from the San Joaquin Valley and ended in the Bay Area via I-580. Further, she states that as commute times from San Joaquin Valley to the Bay Area can take over three hours due to the stop-and-go-traffic; without exploring viable and efficient public transportation options, commute times will only increase and continue to negatively impact air quality.
This bill will establish the Authority with the goal of addressing regional economic and transportation challenges by planning, developing and delivering a cost effective and responsive connection of BART and ACE, connecting the San Joaquin Valley to the Tri-Valley and Bay Area.
Currently, the first phase of this connection is being undertaken by BART. Specifically, BART is working on the development of the BART to Livermore extension which would extend the BART rail line by 5.5 miles along I-580 from the existing Dublin/Pleasanton Station to a new station in the vicinity of the Isabel Avenue interchange. The project would also incorporate improvements to the local bus system, connections with key activity centers in Livermore and inter-regional rail service.
In July 2017, BART released a project-level Draft Environmental Impact Report (EIR), as required by the California Environmental Quality Act, for the proposed project. The project-level EIR evaluates the construction of the BART rail extension and examines alternatives to the proposed project. The projected costs for the extension to Livermore vary widely with $1.6 billion for a conventional BART system expansion with ongoing operating costs of $19 million to $373 million for Bus Rapid Transit (BRT), with ongoing operations costs of $2.1 million. BART could also choose to not build any project. If a project is built, BART's anticipated date for opening the completed extension and new BART station is 2026. However, the Livermore extension is only the first part of a final connection of BART to ACE. There are numerous options being discussed and explored to make the final connection.
Some community leaders have expressed concerns that BART is not prioritizing the Livermore extension project. Additionally, as noted, the Livermore extension does not connect BART and ACE. In February 2016, local officials created the Altamont Regional Rail Working Group to focus on potential BART to ACE linkages to better connect the Bay Area to the Central Valley region. The Working Group contains local officials from the area communities, and representatives from BART and ACE. This bill builds upon this Working Group by establishing the Authority and tasking it with developing a project feasibility report by July 1, 2019, for the connection of BART to ACE and further serve as the construction authority for its implementation.
Committee Comments: This bill was amended in the Senate to authorize a more expansive role and powers for the new Authority than the bill that was voted out of this committee. The amendments authorize the Authority to plan, develop, construct, deliver, and possibly operate any project or projects that achieve "transit connectivity" in the Tri-Valley. Specifically, the Authority can pursue and accept funding; acquire property, including by eminent domain; incur debt; contract with public and private entities; relocate utilities; and enter into joint development agreements.
Additionally, this bill calls into question the ongoing process for the BART to Livermore extension project. As noted, BART is currently circulating a draft EIR document with a decision on a preferred alternative expected in early 2018. However, this bill appears to shift management responsibility to the new Authority. Specifically, the bill shifts any unencumbered local funds programmed for the project, and any other funds identified for "connectivity," to the Authority. It is unclear how local funds planned for the Livermore project, roughly $530 million, or for ACE to BART connectivity would be affected. Currently, funds are dedicated to the Livermore project from Alameda County, through its local sales tax measure, City of Livermore impact fees, and regional bridge tolls. Additionally, the SJRRC has dedicated funds to exploring an ACE to BART connection. The bill attempts to preserve Alameda County and SJRRC's autonomy over their respective funds, but it is uncertain how this will work with the Authority.
If the Livermore extension project proceeds, it is unclear whether the Authority or BART would be the project manager for final design, construction, and operation. The bill also attempts to protect ongoing environmental review processes by BART and SJRRC; however, it revokes this protection on July 1, 2018, if BART has not adopted a preferred alternative for the project. If BART does choose a project alternative before the deadline, will they remain in charge of the project?
This bill appears to force these actions to happen a full year before the July 1, 2019, delivery of the required feasibility report which will detail a plan for BART to ACE connectivity, including identifying project managers, a funding and financing plan, a schedule, and even preliminary design for the project or combination of projects. This report would likely include the Livermore extension project. Although, this bill provides the governing boards of ACE and BART approval authority over any projects affecting their respective systems proposed by the feasibility study, it does not clarify what effect that would have on the ongoing project or work of the Authority.
The creation of the Authority and the development of a feasibility study to look at the possibilities for connecting ACE and BART is important for the Tri-Valley and San Joaquin Valley regions. However, this bill tries to accelerate, and possibly predetermine outcomes, of this process by expanding the Authority's powers and responsibilities prematurely and insert the Authority into ongoing project development by another agency, possibly without its agreement.
Analysis Prepared by: Melissa White / TRANS. / (916) 319-2093 FN: 0002416
SENATE COMMITTEE ON APPROPRIATIONS
Senator Ricardo Lara, Chair
2017 - 2018 Regular Session
AB 758 (Eggman) - Transportation: Tri-Valley-San Joaquin Valley Regional Rail Authority
Version: September 8, 2017 | Policy Vote: T. & H. 11 - 1 |
Urgency: No | Mandate: Yes |
Hearing Date: | Consultant: Mark McKenzie |
This bill meets the criteria for referral to the Suspense File.
Bill Summary:
AB 758 would establish the Tri-Valley-San Joaquin Valley Regional Rail Authority (Authority) for the purposes of planning, developing, and delivering transit connectivity between the Bay Area Rapid Transit District’s (BART’s) transit system and the Altamont Corridor Express (ACE) commuter rail service, as specified.
Fiscal Impact:
- Unknown, potentially reimbursable mandate costs related to the requirement that the Livermore Amador Valley Transit Authority provide interim administrative support to the Authority for the production of the feasibility report, and for other duties and responsibilities. Additional, but likely minor reimbursable mandate costs related to the participation by local agency representatives on the Authority’s governing board. See staff comments. (General Fund)
Background:
Existing law establishes BART to provide rapid transit service in the San Francisco Bay Area, and authorizes BART to acquire, construct, own, operate, control, or use rights-of-way, rail lines, bus lines, stations, platforms, switches, yards, terminals, parking lots, and any and all other facilities necessary and convenient for rapid transit service. In the Altamont Pass commuter corridor that connects the San Joaquin Valley to the Bay Area, the BART rapid transit system runs in the median of the I-580 freeway and currently terminates at the Dublin/Pleasanton station.
An extension of BART service to Livermore is currently in the planning stages. BART has developed conceptual engineering for the project and prepared a project-level draft environmental impact report (EIR) for the proposed 5.5 mile extension to a new station in the vicinity of the I-580/Isabel Avenue interchange, and including additional storage and maintenance facilities north of I-580. Several options for service extension are under consideration, including an extension of “conventional” BART rapid transit service at a projected capital cost of approximately $1.6 billion, a light rail extension at a similar cost, a bus rapid transit system at a cost of about $400 million, and an option not to build any project. The draft EIR is currently in the public comment period, and the BART governing board is expected to release a final EIR and adopt a preferred alternative for the Livermore extension in the Spring of 2018. The anticipated date for opening the completed extension and new BART station is 2026.
The San Joaquin Regional Rail Commission (SJRRC) was formed through a joint powers agreement in 1995 to implement a regional plan for passenger rail service. The SJRRC, through a cooperative services agreement with the Alameda County Congestion Management Agency and the Santa Clara Valley Transportation Authority, owns and operates the ACE commuter rail service, which operates four daily weekday round-trips between Stockton and San Jose. In the Tri-Valley region, the ACE system passes through Livermore and Pleasanton south of I-580, but there is currently no direct train-to-train connectivity with the BART system.
The SJRRC has developed the ACEforward plan, which is a phased plan for improvements to the ACE system to increase service reliability and frequency, enhance passenger facilities, reduce travel times in the existing service corridor, and extend service to Merced. Among the longer-term improvements envisioned in the plan is enhanced transit connectivity and an evaluation of establishing a train-to-train ACE/BART connection in the Tri-Valley and/or Union City. The SJRRC has prepared a draft EIR for ACEforward that includes a programmatic analysis of 11 options for transit connectivity between ACE and BART in the Tri-Valley Area. The options include a bus shuttle connection from ACE Livermore to the proposed BART Isabel Avenue at a cost of $1.1 billion, several options for a light rail connection between the systems at costs ranging from $1.2 - $1.9 billion, and various options for extending ACE to the BART system and vice versa at costs ranging from $1.1 - $3.5 billion. The highest cost alternatives are train-to-train connections that extend BART from the existing terminus at Dublin/Pleasanton to existing ACE Livermore and Vasco Road stations, but the draft EIR notes that these options also provide the greatest benefits to regional traffic, air quality, and greenhouse gas emissions, have among the highest ACE/BART ridership benefits, and avoid many of the environmental impacts associated with other options.
The Livermore Amador Valley Transit Authority (LAVTA) was created by a joint powers agreement in 1985 to provide transit services to the cities of Dublin, Livermore, and Pleasanton, as well as to unincorporated areas of Alameda County. LAVTA currently operates the “Wheels” bus shuttle service between the ACE station in Pleasanton and the BART West Dublin/Pleasanton station.
Local officials established the Alameda-San Joaquin Regional Rail Working Group in late 2015 to provide a venue for monthly collaboration on issues related to inter-regional rail planning and connectivity, including reviews of plans for connections between the BART and ACE systems. Working Group members include representatives of local government, BART, SJRRC, and LAVTA, and other partners.
Proposed Law:
AB 758 would establish the Authority for purposes of planning, developing, and delivering a project or projects that achieve transit connectivity between BART’s rapid transit system and the ACE commuter rail service in the Tri-Valley region. This bill would:
- Establish a 15-member governing board for the Authority comprised of appointees from specified cities and counties in the region, BART, the SJRRC, the Livermore Amador Valley Transit Authority (LAVTA), and the Mountain House Community Services District.
- Vest the Authority with specified powers necessary for planning, acquiring, leasing, developing, owning, controlling, using, disposing of, designing, procuring, and constructing facilities to achieve transit connectivity.
- Require the LAVTA to provide all necessary administrative support to the Authority governing board for an initial 18-month period, as specified. At the conclusion of that initial period, the bill authorizes the board to select the LAVTA or the SJRRC to provide administrative support, or to hire an executive director to appoint staff or hire consultants to perform those functions.
- Require all unencumbered local funds programmed for the completion of the BART Livermore extension, or otherwise identified for connectivity, to be transferred to the Authority. Local funds controlled by the Alameda County Transportation Commission for the completion of the BART Livermore extension or other connectivity, or funds controlled by the SJRRC that have been identified for connectivity, would continue to be programmed and allocated controlled by those entities.
- Authorize the Authority to apply for and receive state and federal funds, and pursue any and all sources of funding for connectivity, except the bill prohibits the Authority from applying for funds under the Transportation Development Act, as specified.
- Require the Authority to provide a project feasibility report by July 1, 2019 that includes the following:
- Recommendations for expediting the development of transit connectivity between the BART and ACE systems in the Tri-Valley region.
- Identification of a preferred entity or entities to deliver transit connectivity between the systems, including each entities specified roles.
- A funding plan describing any grants, loans, allocations, fund transfers, or awards of local, regional, state, federal, or private funds available for achieving transit connectivity.
- A description of any financing plan, including revenue sources, timelines for completing financing, and estimated total cost of financing.
- A proposed schedule for completion of transit connectivity.
- A preliminary design for the connectivity project or projects.
- Authorize the Authority to use any relevant environmental review documents prepared by BART or the SJRRC to prepare the feasibility report.
- Require the Authority to submit the feasibility report to the Metropolitan Transportation Commission, the BART and SJRRC governing boards, the Legislature, and the California Transportation Agency.
- Authorize the Authority to enter into agreements with BART, SJRRC or any other entity to achieve transit connectivity, consistent with the feasibility report.
- Authorize BART and SJRRC to approve or deny any recommendation in the feasibility report for an extension of each entity’s respective system, as specified.
- Require the Authority and any contracted operator of the transit connectivity facilities to be subject to specified open meeting and public records laws.
- Specify that the bill is not intended to disrupt current BART or SJRRC environmental review processes, or infringe upon BART’s planning, development, and delivery process for a BART extension in the I-580 corridor to the I-580/Isabel Avenue interchange.
- Specify that the bill is inoperative on July 1, 2018 if the BART governing board fails to adopt a preferred alternative for an extension to the I-580/Isabel interchange by June 30, 2018.
Related Legislation:
AB 2762 (Baker), which was introduced in 2016 but never heard in a committee, would have created the Altamont Pass Regional Rail Authority for the purposes of planning and delivering a cost effective and responsive interregional rail connection between BART and ACE in the City of Livermore.
Staff Comments:
This bill is intended to facilitate the planning, development, and delivery of a direct connection between the BART and ACE systems. Both BART and the SJRRC are in the planning stages for extending service, but there are no adopted plans for transit connectivity to date. According to draft environmental documents, total capital costs for connecting the systems could be the range of several billion dollars, depending on the options selected. BART has already identified approximately $533 million for design and construction of the BART extension to Livermore. The SJRRC has not identified specific funding for connecting the systems, but has done preliminary long-term planning in its ACEforward efforts to identify potential train-to-train connections between the systems. This bill requires some of the unencumbered local funds programmed for the completion of the BART Livermore extension to be transferred to the Authority to perform its duties and responsibilities. Specifically, $40 million in local Traffic Impact Fees will be transferred to the Authority, but it is unclear whether $95 million in bridge toll revenues will be transferred to the Authority. Approximately $398 million in local sales tax funds will be retained by the Alameda County Transportation Commission. Overall funding for any transit connection between the systems will likely come from a variety of local, state, and federal funds, but this bill is not expected to result in any additional costs or cost pressures to fund the project or projects that are ultimately selected to achieve connectivity.
The bill imposes a state mandated local program by requiring the LAVTA to provide all necessary support to the Authority board to perform its duties and responsibilities for an 18-month period, and requiring participation by specified local agencies to designate members of the Authority governing board. Costs to LAVTA to develop and submit a project feasibility report by July 1, 2019 would likely be significant. However, the bill requires the transfer of unencumbered funds from BART to support the Authority governing board, and LAVTA has general authority to adjust its transit rates to offset any administrative costs, so it appears unlikely that the Commission on State Mandates would approve any claims for reimbursement that may be submitted by LAVTA. Ultimately, any determinations for state reimbursement would be determined by the Commission. Any reimbursable costs associated with participation on the Authority’s governing body would likely be minor.
-- END --
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB |
THIRD READING
Bill No: AB 758
:
SENATE TRANS. & HOUSING COMMITTEE: 11-1, 9/13/17
AYES: Beall, Cannella, Allen, Atkins, Gaines, McGuire, Mendoza, Morrell, Roth, Vidak, Wiener
NOES: Wieckowski
NO VOTE RECORDED: Skinner
SENATE APPROPRIATIONS COMMITTEE: 7-0, 9/15/17
AYES: Lara, Bates, Beall, Bradford, Hill, Nielsen, Wiener
ASSEMBLY FLOOR: 72-0, 6/1/17 - See last page for vote
DIGEST:
This bill establishes the Tri-Valley-San Joaquin Valley Regional Rail Authority (Authority) and designates various duties, as specified.
Existing law:
- Provides for the creation of statewide and local transportation agencies, which may be established as joint powers authorities or established expressly by statute.
- Establishes the Bay Area Rapid Transit District (BART), which is authorized to acquire, construct, own, operate, control, or use rights-of-way, rail lines, bus lines, stations, platforms, switches, yards, terminals, parking lots, and any and all other facilities necessary or convenient for rapid transit service.
- Allows for the creation of the San Joaquin Regional Rail Commission which operates the commuter rail service otherwise known as the Altamont Corridor Express (ACE) providing commuter rail passenger rail service from Stockton to San Jose.
This bill:
- Makes legislative findings and declarations regarding the need for strategic and planned interregional mobility in the Altamont Pass corridor.
- Establishes the Authority for purposes of planning, developing, and delivering cost-effective and responsive transit connectivity between BART and ACE that meets the goals and objectives of the San Joaquin Valley and Tri-Valley communities, consistent with a project feasibility report required by this bill. The Authority's membership is composed of one representative from each of the following entities:
- BART;
- The City of Dublin;
- The City of Lathrop;
- The City of Livermore;
- The City of Manteca;
- The City of Pleasanton;
- The City of Stockton;
- The City of Tracy;
- The County of Alameda;
- The County of San Joaquin;
- The Livermore Amador Valley Transit Authority;
- Mountain House Community Services District;
- San Joaquin Regional Rail Commission;
- The City of Danville; and
- The City of San Ramon.
- Provides that the Authority possesses all powers necessary for planning, acquiring property, leasing, developing, owning, controlling, designing, procuring contracts, and constructing facilities to achieve transit connectivity between BART and ACE.
- Requires the Livermore Amador Valley Transit Authority administrative staff to provide all necessary administrative support to the authority board for 18 months.
- Requires that all unencumbered local funds programmed for the completion of the BART to Livermore extension are to be transferred to the Authority to fund the identified connection project except:
- local funds controlled by the Alameda County Transportation Commission (ACTC) to be used for the BART Livermore extension shall continue to be programmed and allocated by ACTC; and
- local funds controlled by the San Joaquin Regional Rail Commission (SJRRC) that have been identified for connectivity shall continue to be programmed and allocated by (SJRRC).
- Specifies that the Authority is eligible to apply for and receive state and federal fund allocations, except for funds available under the Transportation Development Act for which any member entity of the authority is also an applicant.
- Requires the Authority to provide a project feasibility report by July 1, 2019. The report shall include:
- Recommendations for expediting the development of cost-effective and responsive transit connectivity between BART and ACE in the Tri-Valley region;
- Identification of a preferred entity or entities to deliver transit connectivity between BART and ACE;
- A funding plan describing any grants, loans, allocations, fund transfers, or awards of local, regional, state, federal, or private funds to be made available for achieving transit connectivity;
- A description of any financing plan;
- A proposed schedule for completion; and
- A preliminary design for the project or projects;
- Provides that if the feasibility report includes a recommendation for an extension of BART’s system, the BART governing board has the authority to approve or deny the recommendation. Similarly, if the feasibility report includes a recommendation for an extension of the ACE service, the governing board of the SJRRC shall have the authority to approve or deny the recommendation.
- Authorizes the Authority to use any relevant environmental documents previously completed by BART and the SJRRC to complete the feasibility report.
- Requires the Authority and any entity which operates the connection between BART and ACE to be subject to the Meyers-Lilias-Brown Act, the California Public Records Act, and the Brown Act.
- Declares that nothing in the bill is intended to disrupt the environmental review processes currently underway at BART or SJRRC, or infringe upon BARTs process for planning, development, and delivery of a BART extension within the I-580 Corridor to the vicinity of the I-580/Isabel Avenue interchange. This section becomes inoperative on July 1, 2018, if the BART governing board fails to adopt a preferred alternative for a BART extension.
Comments
- Purpose. According to the author, “Interstate 580 through the Altamont Pass Corridor connects the industrial and agricultural powerhouse that is the San Joaquin Valley to the Bay Area, the capital of high tech and innovation. Combined, the two comprise an economic megaregion with links to ground, air and ocean trade networks. Thousands of drivers commute over the interstate daily from the San Joaquin Valley, where home prices are affordable, to the Bay Area, where many jobs are located. Creating an authority that can focus on establishing a connection between ACE Rail and BART will help to both decrease traffic on this critical freeway and reduce greenhouse gas emissions.”
- Altamont Pass and ACE. The Altamont Pass serves as the commuter corridor connecting the San Joaquin Valley to the Bay Area. I-580 is the freeway connector and ranks as one of the most congested freeways in the mega-region during peak hours due to a high volume of regional and interregional commuter, freight, and recreational traffic. Additionally, San Joaquin County, and other counties in the San Joaquin Valley, are some of the fastest growing in the state. Since 1990, the number of people commuting daily from the northern San Joaquin Valley to the Bay Area has more than doubled, growing from 32,000 to nearly 65,000 commuters. Currently, the ACE train brings commuters from the northern San Joaquin Valley from the cities of Stockton, Lathrop and Tracy to the San Jose region. ACE carries nearly 3,000 commuters daily one way or 6,000 round trips.
- BART Extension to Livermore. Currently BART is developing an extension to Livermore, extending the BART rail line by 5.5 miles along the median of I-580 from the existing Dublin/Pleasanton Station to a new station in the vicinity of the Isabel Avenue interchange. The project would also incorporate improvements to the local bus system, connections with key activity centers in Livermore and inter-regional rail service.
A draft Environmental Impact Report was released on July 31, 2017, for public comment, with the comment period closing this week. Several options are being considered, including an extension of the BART system at a capital cost of $1.6 billion, a light rail extension at a similar capital cost, a bus rapid transit system for about $400 million, and an option not to build any project.
Following a public review and comment period, one of the options for the project will be selected by the BART Board of Directors as the preferred transit mode for the extension to Livermore. BART then anticipates preparing a federal-level Environmental Impact Statement to comply with the National Environmental Policy Act, as federal monies may be part of the funding picture. BART’s anticipated date for opening the completed extension and new BART station is 2026.
- No connection. While the Livermore extension is only the first part to a final connection, no formal plan exists that identifies a pathway and/or project to connect ACE and BART. However, there are numerous options being discussed and explored. For example, ACE is undertaking an EIR process at a programmatic and project level to study options for the connection and increasing ACE service as part of its ACEForward initiative. Additionally, in February 2016, local officials created the Altamont Regional Rail Working Group to focus on potential ACE to BART linkages to better connect the Bay Area to the Central Valley region. The Working Group contains local officials from the area communities, and representatives from ACE and BART.
The provisions specified in this bill build off the working group by creating an Authority to study, develop, and construct a cost effective connection between ACE and BART. Supporters of this bill assert that this bill is necessary to deliver a much-needed interregional rail connection between the San Joaquin Valley and the Bay Area’s Tri-Valley region. Some have raised concerns that this bill would duplicate and undermine the existing studies being conducted by ACE and BART and also create a new entity that may compete for funds with other Bay Area and Central Valley transportation agencies.
- Retaining Discretion. This bill illustrates the tension between funding for much-needed improvements to the existing BART system and extending the BART system to serve new riders. That BART and ACE should connect is not controversial. How and where that connection should be made is. This bill creates a process for determining that connection, albeit with the overall constraint that the connections occur in the Tri-Valley area. The bill establishes a rail authority whose first task is developing a feasibility study recommending a cost-effective connection between BART and ACE. To preserve their autonomy, the bill allows both BART and SJRRC, the ACE operator, veto power over any recommendation which requires either of them to connect with the other. The bill also explicitly states that it is not intended to interfere with BART’s current effort to determine if and how they will extend into Livermore. These provisions will push the parties towards a consensus solution.
- Following the Money. This bill requires certain funds to be turned over to the Authority. Of $533 million in local funds that BART has identified for their Livermore project, $40 million from the City of Livermore’s Traffic Impact Fees will be turned over to the Authority and $398 million will be retained by the Alameda County Transportation Commission. It isn’t clear whether the remaining $95 million, which come from bridge tolls, will be turned over to the Authority.
- Opposition. There is opposition to the prior version of the bill; most positions have not been updated to account for the recent revisions. Some opponents are concerned about expanding BART before improving BART’s existing operations. And BART is concerned that the bill doesn’t give them approval authority over any extension and jeopardizes their Livermore funding. The recently amended bill appears to address many, but not all, of the concerns of the opposition by giving BART veto authority over any plan which requires them to connect to ACE, limiting the funding that will be transferred to the Authority, and declaring that the bill is not intended to interfere with BART’s currently Livermore project review process.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
According to the Senate Appropriations Committee:
- Unknown, potentially reimbursable mandate costs related to the requirement that the Livermore Amador Valley Transit Authority provide interim administrative support to the Authority for the production of the feasibility report, and for other duties and responsibilities. Additional, but likely minor reimbursable mandate costs related to the participation by local agency representatives on the Authority’s governing board. (General Fund)
Alameda County
Alameda-San Joaquin Regional Rail Working Group
City of Dublin
City of Lathrop
City of Livermore
City of Stockton
City of Tracy
East Bay Leadership Council
Innovation Tri-Valley Leadership Group
Livermore Amador Valley Transit Authority
Livermore Valley Chamber of Commerce
San Joaquin County
San Joaquin Partnership
Town of Danville
OPPOSITION: (Verified 9/14/17)
Amalgamated Transit Union
BART
Bay Area Transportation Working Group
TransForm
Urban Habitat and Public Advocates
ASSEMBLY FLOOR: 72-0, 6/1/17
AYES: Acosta, Aguiar-Curry, Travis Allen, Arambula, Baker, Berman, Bigelow, Bocanegra, Bonta, Brough, Burke, Caballero, Calderon, Cervantes, Chau, Chávez, Chen, Chu, Cooley, Cooper, Cunningham, Dababneh, Dahle, Daly, Eggman, Flora, Fong, Frazier, Friedman, Gallagher, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gomez, Gonzalez Fletcher, Gray, Grayson, Harper, Holden, Irwin, Jones-Sawyer, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Quirk-Silva, Reyes, Ridley-Thomas, Rodriguez, Rubio, Salas, Santiago, Steinorth, Mark Stone, Voepel, Waldron, Weber, Wood, Rendon
NO VOTE RECORDED: Bloom, Chiu, Choi, Kalra, Mullin, Quirk, Thurmond, Ting
9/15/17 15:28:28
**** END ****
SENATE COMMITTEE ON TRANSPORTATION AND HOUSING
Senator Jim Beall, Chair
2017 - 2018 Regular
Bill No: AB 758 Hearing Date: 9/13/17
Author: | Eggman | ||
Version: | 9/8/2017 Amended Senate | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Randy Chinn | ||
SUBJECT: Transportation: Tri-Valley-San Joaquin Valley Regional Rail Authority.
DIGEST: This bill establishes the Tri-Valley-San Joaquin Valley Regional Rail Authority (Authority) and designates various duties, as specified.
ANALYSIS:
Existing law:
- Provides for the creation of statewide and local transportation agencies, which may be established as joint powers authorities or established expressly by statute.
- Establishes the Bay Area Rapid Transit District (BART), which is authorized to acquire, construct, own, operate, control, or use rights-of-way, rail lines, bus lines, stations, platforms, switches, yards, terminals, parking lots, and any and all other facilities necessary or convenient for rapid transit service.
- Allows for the creation of the San Joaquin Regional Rail Commission which operates the commuter rail service otherwise known as the Altamont Corridor Express (ACE) providing commuter rail passenger rail service from Stockton to San Jose.
This bill:
- Makes legislative findings and declarations regarding the need for strategic and planned interregional mobility in the Altamont Pass corridor.
- Establishes the Authority for purposes of planning, developing, and delivering cost-effective and responsive transit connectivity between BART and ACE that meets the goals and objectives of the San Joaquin Valley and Tri-Valley communities, consistent with a project feasibility report required by this bill. The Authority's membership is composed of one representative from each of the following entities:
- BART;
- The City of Dublin;
- The City of Lathrop;
- The City of Livermore;
- The City of Manteca;
- The City of Pleasanton;
- The City of Stockton;
- The City of Tracy;
- The County of Alameda;
- The County of San Joaquin;
- The Livermore Amador Valley Transit Authority (LAVTA); and,
- Mountain House Community Services District;
- San Joaquin Regional Rail Commission;
- The City of Danville;
- The City of San Ramon.
- Provides that the Authority possesses all powers necessary for planning, acquiring property, leasing, developing, owning, controlling, designing, procuring contracts, and constructing facilities to achieve transit connectivity between BART and ACE.
- Requires the Livermore Amador Valley Transit Authority administrative staff to provide all necessary administrative support to the authority board for 18 months.
- Requires that all unencumbered local funds programmed for the completion of the BART to Livermore extension are to be transferred to the Authority to fund the identified connection project except:
- local funds controlled by the Alameda County Transportation Commission (ACTC) to be used for the BART Livermore extension shall continue to be programmed and allocated by ACTC;
- local funds controlled by the San Joaquin Regional Rail Commission (SJRRC) that have been identified for connectivity shall continue to be programmed and allocated by (SJRRC);
- Specifies that the Authority is eligible to apply for and receive state and federal fund allocations, except for funds available under the Transportation Development Act for which any member entity of the authority is also an applicant.
- Requires the Authority to provide a project feasibility report by July 1, 2019. The report shall include:
- Recommendations for expediting the development of cost-effective and responsive transit connectivity between BART and ACE in the Tri-Valley region;
- Identification of a preferred entity or entities to deliver transit connectivity between BART and ACE;
- A funding plan describing any grants, loans, allocations, fund transfers, or awards of local, regional, state, federal, or private funds to be made available for achieving transit connectivity;
- A description of any financing plan;
- A proposed schedule for completion;
- A preliminary design for the project or projects;
- If the feasibility report includes a recommendation for an extension of BART’s system, the BART governing board has the authority to approve or deny the recommendation. Similarly, if the feasibility report includes a recommendation for an extension of the ACE service, the governing board of the SJRRC shall have the authority to approve or deny the recommendation.
- Authorizes the Authority to use any relevant environmental documents previously completed by BART and the SJRRC to complete the feasibility report.
- Requires the Authority and any entity which operates the connection between BART and ACE to be subject to the Meyers-Lilias-Brown Act, the California Public Records Act, and the Brown Act.
- Declares that nothing in the bill is intended to disrupt the environmental review processes currently underway at BART or SJRRC, or infringe upon BARTs process for planning, development, and delivery of a BART extension within the I-580 Corridor to the vicinity of the I-580/Isabel Avenue interchange. This section becomes inoperative on July 1, 2018 if the BART governing board fails to adopt a preferred alternative for a BART extension.
COMMENTS:
- Purpose. According to the author, “Interstate 580 through the Altamont Pass Corridor connects the industrial and agricultural powerhouse that is the San Joaquin Valley to the Bay Area, the capital of high tech and innovation. Combined, the two comprise an economic megaregion with links to ground, air and ocean trade networks. Thousands of drivers commute over the interstate daily from the San Joaquin Valley, where home prices are affordable, to the Bay Area, where many jobs are located. Creating an authority that can focus on establishing a connection between ACE Rail and BART will help to both decrease traffic on this critical freeway and reduce greenhouse gas emissions.”
- Altamont Pass and ACE. The Altamont Pass serves as the commuter corridor connecting the San Joaquin Valley to the Bay Area. I-580 is the freeway connector and ranks as one of the most congested freeways in the mega-region during peak hours due to a high volume of regional and interregional commuter, freight, and recreational traffic. Additionally, San Joaquin County, and other counties in the San Joaquin Valley, are some of the fastest growing in the state. Since 1990, the number of people commuting daily from the northern San Joaquin Valley to the Bay Area has more than doubled, growing from 32,000 to nearly 65,000 commuters. Currently, the ACE train brings commuters from the northern San Joaquin Valley from the cities of Stockton, Lathrop and Tracy to the San Jose region. ACE carries nearly 3,000 commuters daily one way or 6,000 round trips.
- BART Extension to Livermore. Currently BART is developing an extension to Livermore, extending the BART rail line by 5.5 miles along the median of I-580 from the existing Dublin/Pleasanton Station to a new station in the vicinity of the Isabel Avenue interchange. The project would also incorporate improvements to the local bus system, connections with key activity centers in Livermore and inter-regional rail service.
A draft Environmental Impact Report was released on July 31, 2017 for public comment, with the comment period closing this week. Several options are being considered, including an extension of the BART system at a capital cost of $1.6 billion, a light rail extension at a similar capital cost, a bus rapid transit system for about $400 million, and an option not to build any project.
Following a public review and comment period, one of the options for the project will be selected by the BART Board of Directors as the preferred transit mode for the extension to Livermore. BART then anticipates preparing a federal-level Environmental Impact Statement to comply with the National Environmental Policy Act, as federal monies may be part of the funding picture. BART’s anticipated date for opening the completed extension and new BART station is 2026.
- No connection. While the Livermore extension is only the first part to a final connection, no formal plan exists that identifies a pathway and/or project to connect ACE and BART. However, there are numerous options being discussed and explored. For example, ACE is undertaking an EIR process at a programmatic and project level to study options for the connection and increasing ACE service as part of its ACEForward initiative. Additionally, in February 2016, local officials created the Altamont Regional Rail Working Group to focus on potential ACE to BART linkages to better connect the Bay Area to the Central Valley region. The Working Group contains local officials from the area communities, and representatives from ACE and BART.
The provisions specified in this bill build off the working group by creating an Authority to study, develop, and construct a cost effective connection between ACE and BART. Supporters of this bill assert that this bill is necessary to deliver a much-needed interregional rail connection between the San Joaquin Valley and the Bay Area’s Tri-Valley region. Some have raised concerns that this bill would duplicate and undermine the existing studies being conducted by ACE and BART and also create a new entity that may compete for funds with other Bay Area and Central Valley transportation agencies.
- Retaining Discretion. This bill illustrates the tension between funding for much-needed improvements to the existing BART system and extending the BART system to serve new riders. That BART and ACE should connect is not controversial. How and where that connection should be made is. This bill creates a process for determining that connection, albeit with the overall constraint that the connections occur in the Tri-Valley area. The bill establishes a rail authority whose first task is developing a feasibility study recommending a cost-effective connection between BART and ACE. To preserve their autonomy, the bill allows both BART and SJRRC, the ACE operator, veto power over any recommendation which requires either of them to connect with the other. The bill also explicitly states that it is not intended to interfere with BART’s current effort to determine if and how they will extend into Livermore. These provisions will push the parties towards a consensus solution.
- Following the Money. This bill requires certain funds to be turned over to the Authority. Of $533 million in local funds that BART has identified for their Livermore project, $40 million from the City of Livermore’s Traffic Impact Fees will be turned over to the Authority and $398 million will be retained by the Alameda County Transportation Commission. It isn’t clear whether the remaining $95 million, which come from bridge tolls, will be turned over to the Authority.
- Opposition. There is opposition to the prior version of the bill; most positions have not been updated to account for the recent revisions. Some opponents are concerned about expanding BART before improving BART’s existing operations. And BART is concerned that the bill doesn’t give them approval authority over any extension and jeopardizes their Livermore funding. The recently amended bill appears to address many, but not all, of the concerns of the opposition by giving BART veto authority over any plan which requires them to connect to ACE, limiting the funding that will be transferred to the Authority, and declaring that the bill is not intended to interfere with BART’s currently Livermore project review process.
Assembly votes:
Floor: 72-0
Approps: 17-0
Trans: 14-0
Related Legislation:
AB 2762 (Baker, 2016) — would have created the Altamont Pass Regional Rail Authority for the purposes of planning and delivering a cost effective and responsive interregional rail connection between BART and ACE in the City of Livermore. AB 2762 was held in the Assembly Transportation Committee.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
POSITIONS: (Communicated to the committee before 10 a.m. on Wednesday, September 13, 2017.)
SUPPORT:
Alameda County
Alameda-San Joaquin Regional Rail Working Group
City of Dublin
City of Lathrop
City of Livermore
City of Stockton
City of Tracy
East Bay Leadership Council
Innovation Tri-Valley Leadership Group
Livermore Amador Valley Transit Authority
Livermore Valley Chamber of Commerce
San Joaquin County
San Joaquin Partnership
Town of Danville
OPPOSITION:
Amalgamated Transit Union
BART
Bay Area Transportation Working Group
TransForm
Urban Habitat and Public Advocates
-- END --
SENATE COMMITTEE ON TRANSPORTATION AND HOUSING
Senator Jim Beall, Chair
2017 - 2018 Regular
Bill No: AB 758 Hearing Date: 7/11/2017
Author: | Eggman | ||
Version: | 7/5/2017 | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Manny Leon | ||
SUBJECT: Transportation: Tri-Valley-San Joaquin Valley Regional Construction Authority
DIGEST: This bill establishes the Tri-Valley-San Joaquin Valley Regional Construction Authority (Authority) and designates various duties, as specified.
ANALYSIS:
Existing law:
- Provides for the creation of statewide and local transportation agencies, which may be established as joint powers authorities or established expressly by statute.
- Establishes the Bay Area Rapid Transit District (BART), which is authorized to acquire, construct, own, operate, control, or use rights-of-way, rail lines, bus lines, stations, platforms, switches, yards, terminals, parking lots, and any and all other facilities necessary or convenient for rapid transit service.
- Allows for the creation of the San Joaquin Regional Rail Commission which operates the commuter rail service otherwise known as the Altamont Corridor Express (ACE) providing commuter rail passenger rail service from Stockton to San Jose.
This bill:
- Makes legislative findings and declarations regarding the need for strategic and planned interregional mobility in the Altamont Pass corridor.
- Defines key terms, including:
- “Authority” to mean the Tri-Valley-San Joaquin Valley Regional Construction Authority;
- "Connection" to mean a connection between BART and ACE in the Tri-Valley; and,
- “Tri-Valley” to mean the cities of Danville, Livermore, Pleasanton, and San Ramon.
- Establishes the Authority for purposes of planning, developing, and delivering a cost-effective and responsive connection that meets the goals and objectives of the community; and prescribes the Authority's membership, to be composed of one representative from each of the following entities:
- San Joaquin Regional Rail Commission;
- BART;
- The City of Dublin;
- The City of Lathrop;
- The City of Livermore;
- The City of Pleasanton;
- The City of Stockton;
- The City of Tracy;
- The County of Alameda;
- The County of San Joaquin;
- The Livermore Amador Valley Transit Authority (LAVTA); and,
- Mountain House Community Services District.
- Provides that the Authority possesses all powers necessary for planning, acquiring property, leasing, developing, procuring contracts, and building the project, as specified.
- Provides for administrative support for the Authority, and authorizes the Authority to partner with LAVTA and the San Joaquin Regional Rail Commission, as specified.
- Requires that all unencumbered local funds programmed for the completion of the BART to Livermore extension are to be transferred to the Authority to fund the identified connection project.
- Specifies that the Authority is eligible to receive state and federal fund allocations. Further specifies that the Authority shall not apply for competing Transportation Development Act funds that are allocated to any member entity of the Authority’s board without the express written consent of that member entity.
- Specifies that if the identified project includes a BART extension:
- The Authority shall enter into a memorandum of understanding with BART to review any significant changes in the scope of design or construction, as specified; and,
- The Authority shall not encumber the project with any obligation that is transferrable to BART upon completion of the design and construction of the project. Further specifies rolling stock is not included as part of the design and construction of the project.
- Specifies that upon completion of the project, the operator(s) are to be determined as follows:
- For any extension of the BART system, BART shall assume responsibility for operating the BART extension; and,
- For any portion that is not part of a BART extension, the San Joaquin Regional Rail Commission or other rail authority shall assume responsibility, as specified.
- Requires all assets to be transferred to the abovementioned operators upon completion of the project.
- Requires the Authority, by July 1, 2018, to provide a project feasibility report to the public and post on its website, detailing the plans for the development and implementation of the connection, including proposed scope, schedule and cost.
- Authorizes the Authority to use any environmental documents previously completed by BART and the San Joaquin Regional Rail Commission to complete the feasibility report.
- Directs the Authority to dissolve upon completion of the connection.
COMMENTS:
- Purpose. According to the author, “Interstate 580 through the Altamont Pass Corridor connects the industrial and agricultural powerhouse that is the San Joaquin Valley to the Bay Area, the capital of high tech and innovation. Combined, the two comprise an economic megaregion with links to ground, air and ocean trade networks. Thousands of drivers commute over the interstate daily from the San Joaquin Valley, where home prices are affordable, to the Bay Area, where many jobs are located. Creating an authority that can focus on establishing a connection between ACE Rail and BART will help to both decrease traffic on this critical freeway and reduce greenhouse gas emissions.”
- Altamont Pass and ACE. The Altamont Pass serves as the commuter corridor connecting the San Joaquin Valley to the Bay Area. I-580 is the freeway connector and ranks as of one of the most congested freeways in the mega-region during peak hours due to high volume of regional and interregional commuter, freight, and recreational traffic. Additionally, San Joaquin County, and other counties in the San Joaquin Valley are some of the fastest growing in the state. Since 1990, the number of people commuting daily from the northern San Joaquin Valley to the Bay Area has more than doubled, growing from 32,000 to nearly 65,000 commuters. Currently, the ACE train brings commuters from the northern San Joaquin Valley from the cities of Stockton, Lathrop and Tracy to the San Jose region. ACE carries nearly 3,000 commuters daily one way or 6,000 round trips.
- BART Extension to Livermore. Currently BART is working on the development of the BART to Livermore extension which would extend the BART rail line by 5.5 miles along I-580 from the existing Dublin/Pleasanton Station to a new station in the vicinity of the Isabel Avenue interchange. The project would also incorporate improvements to the local bus system, connections with key activity centers in Livermore and inter-regional rail service.
The original cost estimate for the project was $1.2 billion in 2010, but will be updated upon completion of the environmental review which is anticipated to be released in late summer of this year. The project is being funded by a combination of revenue from Alameda County’s local sales tax measures, regional bridge tolls, and City of Livermore impact fees, all of which represent roughly 45% of the total estimated cost.
The project-level EIR will build upon the 2010 program-level EIR, which looked at 10 alignment alternatives. The project-level EIR will evaluate the construction of the BART rail extension, including the BART station, associated parking, storage tracks, as well as the operation of new BART and bus services. Additionally, as part of the EIR process, BART must also examine alternatives to the proposed project, including a no build alternative, a Diesel Multiple Unit or Electric Multiple Unit Alternative, an Express Bus/Bus Rapid Transit Alternative, and an Enhanced Bus Alternative.
Following a public review and comment period, one of the options for the project will be selected by the BART Board of Directors as the preferred transit mode for the extension to Livermore. BART then anticipates the need to prepare a federal-level Environmental Impact Statement to comply with the National Environmental Policy Act, as federal monies may be part of the funding picture. BART’s anticipated date for opening the completed extension and new BART station is 2026.
- No connection. While the Livermore extension is only the first part to a final connection, no formal plan exists that identifies a pathway and/or project to connect ACE and BART. However, there are numerous options being discussed and explored to make the final connection. For example, ACE is undertaking an EIR process at a programmatic and project level to study options for the connection and increasing ACE service as part of its ACEForward initiative. Additionally, in February 2016, local officials created the Altamont Regional Rail Working Group to focus on potential ACE to BART linkages to better connect the Bay Area to the Central Valley region. The Working Group contains local officials from the area communities, and representatives from ACE and BART.
The provisions specified in this bill build off the working group by creating an Authority to study, develop, and construct a cost effective connection between ACE and BART. Supporters of this bill assert that this bill is necessary to deliver a much-needed interregional rail connection between the San Joaquin Valley and the Bar Area’s Tri-Valley. Opponents note this bill would duplicate and undermine the existing studies being conducted by ACE and BART and also create a new entity that may compete for funds with other Bay Area and Central Valley transportation agencies.
- Assumptions. While the bill in its current form would create an Authority to plan and construct a connection between ACE and BART, this bill assumes another transportation entity would take over the operations of whatever project is constructed. In fact, this bill explicitly states that the Authority is required to dissolve upon completion of the connection, transportation operations are to be designated to another entity, and that the assets are to be transferred to an applicable operator. However, it is unclear whether BART, ACE, or another entity would have the available rolling stock or financial resources to carry out operations upon the project’s completion. Rather, this bill assumes, with no guarantee, that one or more transportation entities will be available to operate transit services once the project is complete.
Assembly votes:
Floor: 72-0
Approps: 17-0
Trans: 14-0
Related Legislation:
AB 2762 (Baker, 2016) — would have created the Altamont Pass Regional Rail Authority for the purposes of planning and delivering a cost effective and responsive interregional rail connection between BART and ACE in the City of Livermore. AB 2762 was held in the Assembly Transportation Committee.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
POSITIONS: (Communicated to the committee before noon on Wednesday,
July 5, 2017.)
SUPPORT:
Alameda County
City of Dublin
City of Livermore
City of Stockton
City of Tracy
Innovation Tri-Valley Leadership Group
Livermore Amador Valley Transit Authority
Livermore Valley Chamber of Commerce
San Joaquin County
San Joaquin Partnership
San Joaquin Regional Rail Commission
Town of Danville
OPPOSITION:
Amalgamated Transit Union
American Federation of State, County, and Municipal Employees
BART
Service Employees International Union
Urban Habitat and Public Advocates
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 758
Author:(Eggman and Baker)
As Amended Ver:April 18, 2017
Majority vote
Committee | Votes | Ayes | Noes |
Transportation | 14-0 | Frazier, Fong, Aguiar-Curry, Baker, Berman, Bocanegra, Chu, Daly, Friedman, Harper, Mathis, Medina, Nazarian, O'Donnell | |
Appropriations | 17-0 | Gonzalez Fletcher, Bigelow, Bloom, Bocanegra, Bonta, Brough, Calderon, McCarty, Quirk, Fong, Friedman, Gallagher, Eduardo Garcia, Gray, Muratsuchi, Obernolte, Reyes |
|
SUMMARY: Creates the Tri-Valley-San Joaquin Valley Regional Rail Authority to oversee the planning and development of a connection between the Bay Area Rapid Transit (BART) and the Altamont Corridor Express (ACE) in the Tri-Valley. Specifically, this bill:
- Makes legislative findings and declarations regarding:
- The need for strategic and planned interregional mobility in the Altamont Pass corridor;
- The benefits of connecting the BART District's rapid transit system and ACE to increase interregional mobility, provide much-needed highway capacity for expanded goods movement to the bay area's five seaports, and relieve pressure on Interstate 580 (I-580) given the projected population growth in the Central Valley;
- The growing congestion in the corridor adding to emissions, and shifting commuters to rail transportation between the San Joaquin Valley and the Bay Area is highly desirable to help offset the effects on air quality produced by growth in auto travel.
- The intent of the Legislature to establish the Authority to plan and help deliver a cost effective connection of BART and ACE in the Tri-Valley to address regional economic and transportation challenges.
- Defines key terms, including, "Authority" to mean the Tri-Valley-San Joaquin Valley Regional Rail Authority; and, "Connection" to mean a connection between BART and ACE in the Tri-Valley.
- Establishes the Authority for purposes of planning and developing a cost-effective and responsive connection that meets the goals and objectives of the community; and prescribes the Authority's membership, to be composed of one representative; from each of the following entities: ACE; BART; the City of Dublin; the City of Lathrop; the City of Livermore; the City of Pleasanton; the City of Stockton; the City of Tracy; the County of Alameda; the County of San Joaquin; the East Bay Leadership Council; Innovation Tri-Valley; the Livermore Amador Valley Transit Authority (LAVTA); and San Joaquin Partnership.
- Provides for administrative support for the Authority, and authorizes the Authority to partner with LAVTA and the San Joaquin Regional Rail Commission.
- Requires the Authority, by July 1, 2018, to provide a project feasibility report to the public and post on its website, detailing the plans for the development and implementation of the connection, including proposed scope, schedule and cost.
- Directs the Authority to dissolve upon completion of the connection.
FISCAL EFFECT: According to the Assembly Appropriations Committee, general fuds costs in the low millions of dollars from a potentially reimbursable state mandate to conduct a feasibility study and for administrative costs associated with the Rail Authority.
COMMENTS: The Altamont Pass serves as the commuter corridor connecting the San Joaquin Valley to the Bay Area. I-580 is the freeway connector and ranks as of one of the most congested freeways in the mega-region during peak hours due to high volume of regional and interregional commuter, freight, and recreational traffic. Currently, the ACE train brings commuters from the northern San Joaquin Valley from the cities of Stockton, Lathrop and Tracy to the Bay Area. ACE carries nearly 3,000 commuters daily one way or 6,000 round trips.
According to the author, this mega-region, the San Joaquin Valley and Bay Area, represents an important economic region as well as a critical transportation route with roughly 207,000 weekday trips that originated from the San Joaquin Valley and ended in the Bay Area via I-580. Further, she states that as commute times from San Joaquin Valley to the Bay Area can take over three hours due to the stop-and-go-traffic; without exploring viable and efficient public transportation options, commute times will only increase and continue to negatively impact air quality.
This bill will establish the Tri-Valley-San Joaquin Valley Regional Rail Authority with the goal of addressing regional economic and transportation challenges by planning and developing a cost effective and responsive connection of BART and ACE, connecting the San Joaquin Valley to the Tri-Valley and Bay Area.
Currently, the first phase of this connection is being undertaken by BART. Specifically, BART is working on the development of the BART to Livermore extension which would extend the BART rail line by 5.5 miles along I-580 from the existing Dublin/Pleasanton Station to a new station in the vicinity of the Isabel Avenue interchange. The project would also incorporate improvements to the local bus system, connections with key activity centers in Livermore and inter-regional rail service.
BART is scheduled to release a project-level Draft Environmental Impact Report (Draft EIR), as required by the California Environmental Quality Act, for the proposed project this spring. The project-level EIR will evaluate the construction of the BART rail extension and examine alternatives to the proposed project. BART’s anticipated date for opening the completed extension and new BART station is 2026. However, the Livermore extension is only the first part of a final connection of BART to ACE. There are numerous options being discussed and explored to make the final connection.
Some community leaders have expressed concerns that BART is not prioritizing the Livermore extension project. Additionally, as noted, the Livermore extension does not connect BART and ACE. In February 2016, local officials created the Altamont Regional Rail Working Group to focus on potential BART to ACE linkages to better connect the Bay Area to the Central Valley region. The Working Group contains local officials from the area communities, and representatives from BART and ACE. This bill builds upon this Working Group by establishing the Tri-Valley-San Joaquin Regional Rail Authority and tasking it with developing a project feasibility report by July 1, 2018, for the connection of BART to ACE. The Authority may, in the future, serve as the project manager for any projects that finalize the connection; however, it is too early to determine what the project, or series of projects, may be and how they would be planned, funded, constructed, and ultimately operated.
Please see the policy committee analysis for full discussion of this bill.
Analysis Prepared by: Melissa White / TRANS. / (916) 319-2093 FN: 0000675
Date of Hearing: May 3, 2017
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez Fletcher, Chair
ABPCA Bill Id:AB 758
Author:(Eggman) – As Amended Ver:April 18, 2017
Policy Committee: | Transportation | Vote: | 14 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: Yes
SUMMARY:
This bill creates the Tri-Valley-San Joaquin Valley Regional Rail Authority (Rail Authority) to oversee the planning and development of a connection between the Bay Area Rapid Transit (BART) and the Altamont Corridor Express (ACE). The authority will have members from ACE, BART, the Livermore Valley Transit Authority, the East Bay Leadership Council, Innovation Tri-Valley, the counties of Alameda and San Joaquin, and six cities in the region. This bill requires the Rail Authority to provide a project feasibility report by July 1, 2018.
FISCAL EFFECT:
GF costs in the low millions of dollars from a potentially reimbursable state mandate to conduct a feasibility study and for administrative costs associated with the Rail Authority.
COMMENTS:
- Purpose and Background. According to the author, “The purpose of this bill is to establish the Tri-Valley-San Joaquin Valley Regional Rail Authority. The goal of the authority will be to address regional economic and transportation challenges by planning and delivering a cost effective and responsive rail extension that connects the Bay Area Rapid Transit (BART) system and the Altamont Corridor Express (ACE), connecting the San Joaquin Valley to the Tri-Valley in Livermore.”
- Staff Comments. By requiring the formation of the Rail Authority and requiring the Rail Authority to conduct a feasibility study, this bill likely creates a reimbursable state mandate. The author may wish to amend the bill to authorize, not require, the involved local agencies to form the Rail Authority and to encourage that Rail Authority to produce a feasibility study. This approach would eliminate state costs.
Analysis Prepared by: Jessica Peters / APPR. / (916) 319-2081
Date of Hearing: April 24, 2017
ASSEMBLY COMMITTEE ON TRANSPORTATION
Jim Frazier, Chair
ABPCA Bill Id:AB 758 (
Author:Eggman) – As Amended Ver:April 18, 2017
SUBJECT: Transportation: Tri-Valley-San Joaquin Valley Regional Rail Authority
SUMMARY: Creates the Tri-Valley-San Joaquin Valley Regional Rail Authority to oversee the planning and development of a connection between the Bay Area Rapid Transit (BART) and the Altamont Corridor Express (ACE) in the Tri-Valley. Specifically, this bill:
- Makes legislative findings and declarations regarding:
- The need for strategic and planned interregional mobility in the Altamont Pass corridor;
- The benefits of connecting the BART District's rapid transit system and ACE to increase interregional mobility, provide much-needed highway capacity for expanded goods movement to the bay area's five seaports, and relieve pressure on Interstate 580 (I-580) given the projected population growth in the Central Valley;
- The growing congestion in the corridor adding to emissions, and shifting commuters to rail transportation between the San Joaquin Valley and the Bay Area is highly desirable to help offset the effects on air quality produced by growth in auto travel.
- The intent of the Legislature to establish the Authority to plan and help deliver a cost effective connection of BART and ACE in the Tri-Valley to address regional economic and transportation challenges.
- Defines key terms, including:
- “Authority” to mean the Tri-Valley-San Joaquin Valley Regional Rail Authority; and,
- "Connection" to mean a connection between BART and ACE in the Tri-Valley.
- Establishes the Authority for purposes of planning and developing a cost-effective and responsive connection that meets the goals and objectives of the community; and prescribes the Authority's membership, to be composed of one representative; from each of the following entities:
- ACE;
- BART;
- The City of Dublin;
- The City of Lathrop;
- The City of Livermore;
- The City of Pleasanton;
- The City of Stockton;
- The City of Tracy;
- The County of Alameda;
- The County of San Joaquin;
- The East Bay Leadership Council;
- Innovation Tri-Valley;
- The Livermore Amador Valley Transit Authority (LAVTA); and,
- San Joaquin Partnership.
- Provides for administrative support for the Authority, and authorizes the Authority to partner with LAVTA and the San Joaquin Regional Rail Commission.
- Requires the Authority, by July 1, 2018, to provide a project feasibility report to the public and post on its website, detailing the plans for the development and implementation of the connection, including proposed scope, schedule and cost.
- Directs the Authority to dissolve upon completion of the connection.
EXISTING LAW:
- Existing law provides for the creation of statewide and local transportation agencies, which may be established as joint powers authorities or established expressly by statute.
- Existing law establishes BART, which is authorized to acquire, construct, own, operate, control, or use rights-of-way, rail lines, bus lines, stations, platforms, switches, yards, terminals, parking lots, and any and all other facilities necessary or convenient for rapid transit service.
FISCAL EFFECT: Unknown
COMMENTS: The Altamont Pass serves as the commuter corridor connecting the San Joaquin Valley to the Bay Area. I-580 is the freeway connector and ranks as of one of the most congested freeways in the mega-region during peak hours due to high volume of regional and interregional commuter, freight, and recreational traffic. Additionally, San Joaquin County, and other counties in the San Joaquin Valley are some of the fastest growing in the state. Since 1990, the number of people commuting daily from the northern San Joaquin Valley to the Bay Area has more than doubled, growing from 32,000 to nearly 65,000 commuters. Currently, the ACE train brings commuters from the northern San Joaquin Valley from the cities of Stockton, Lathrop and Tracy to the Bay Area. ACE carries nearly 3,000 commuters daily one way or 6,000 round trips.
According to the author, this mega-region, the San Joaquin Valley and Bay Area, represents an important economic region as well as a critical transportation route with roughly 207,000 weekday trips that originated from the San Joaquin Valley and ended in the Bay Area via I-580. She further notes that because transportation is the major contributor to ozone precursors, increasing auto travel presents a continued threat to air quality throughout the San Joaquin Valley/Bay Area mega-region. Finally, she states that as commute times from San Joaquin Valley to the Bay Area can take over three hours due to the stop-and-go-traffic; without exploring viable and efficient public transportation options, commute times will only increase and continue to negatively impact air quality.
In developing the San Francisco Bay Area’s Regional Rail Plan, the Metropolitan Transportation Commission (MTC) focused on three main goals: to identify a vision for an interconnected system of Bay Area passenger rail improvements; to create safe, fast, reliable and integrated passenger and freight rail network that addresses anticipated growth in transportation demand; and a system to enhance the economic vitality of the region while minimizing the impact on the environment. As part of that plan, MTC highlighted the importance of a connection between the Bay Area and San Joaquin Valley, and the ultimately connecting all of northern California.
This bill will establish the Tri-Valley-San Joaquin Valley Regional Rail Authority with the goal of addressing regional economic and transportation challenges by planning and developing a cost effective and responsive connection of BART and ACE, connecting the San Joaquin Valley to the Tri-Valley and Bay Area.
Currently, the first phase of this connection is being undertaken by BART. Specifically, BART is working on the development of the BART to Livermore extension which would extend the BART rail line by 5.5 miles along I-580 from the existing Dublin/Pleasanton Station to a new station in the vicinity of the Isabel Avenue interchange. The project would also incorporate improvements to the local bus system, connections with key activity centers in Livermore and inter-regional rail service.
The original cost estimate for the project was $1.2 billion in 2010, but will be updated upon competition of the environmental review phase. The project is being funded by a combination of revenue from Alameda County’s local sales tax measures, regional bridge tolls, and City of Livermore impact fees, all of which represent roughly 45% of the total estimated cost.
BART is scheduled to release a project-level Draft Environmental Impact Report (Draft EIR), as required by the California Environmental Quality Act, for the proposed project this spring. The project-level EIR will build upon the 2010 program-level EIR, which looked at 10 alignment alternatives. The project-level EIR will evaluate the construction of the BART rail extension, including the BART station, associated parking, storage tracks, as well as the operation of new BART and bus services. Additionally, as part of the EIR process, BART must also examine alternatives to the proposed project, including a no build alternative, a Diesel Multiple Unit or Electric Multiple Unit Alternative, an Express Bus/Bus Rapid Transit Alternative, and an Enhanced Bus Alternative.
Following a public review and comment period, one of the options for the project will be selected by the BART Board of Directors as the preferred transit mode for the extension to Livermore, possibly late this year. BART then anticipates the need to prepare a federal-level Environmental Impact Statement to comply with the National Environmental Policy Act, as federal monies may be part of the funding picture. BART’s anticipated date for opening the completed extension and new BART station is 2026.
However, the Livermore extension is only the first part to a final connection from BART to ACE. There are numerous options being discussed and explored to make the final connection. In fact, ACE is also undertaking an EIR process at a programmatic and project level to study options for the connection and increasing ACE service as part of its ACEForward initiative.
Some community leaders have expressed concerns that BART is not prioritizing the Livermore extension project. Additionally, as noted, the Livermore extension does not connect BART and ACE. In February 2016, local officials created the Altamont Regional Rail Working Group to focus on potential BART to ACE linkages to better connect the Bay Area to the Central Valley region. The Working Group contains local officials from the area communities, and representatives from BART and ACE. This bill builds upon this Working Group by establishing the Tri-Valley-San Joaquin Regional Rail Authority and tasking it with developing a project feasibility report by July 1, 2018, for the connection of BART to ACE. The Authority may, in the future, serve as the project manager for any projects that finalize the connection; however, it is too early to determine what the project, or series of projects, may be and how they would be planned, funded, constructed, and ultimately operated.
Previous legislation: AB 2762 (Baker) of 2016 would have created the Altamont Pass Regional Rail Authority for the purposes of planning and delivering a cost effective and responsive interregional rail connection between BART and ACE in the City of Livermore. AB 2762 was held in this committee.
REGISTERED SUPPORT / OPPOSITION:
Support
None on file
Opposition
Bay Area Transportation Working Committee
Analysis Prepared by: Melissa White / TRANS. /
Discussed in Hearing
Senate Standing Committee on Appropriations
Assembly Floor
Senate Floor
Senate Standing Committee on Transportation and Housing
Assembly Floor
Assembly Standing Committee on Appropriations
Assembly Standing Committee on Transportation
Bill Author
Bill Co-Author(s):