AB 920: Electricity: procurement plans: integrated resource plans.
- Session Year: 2017-2018
- House: Assembly
- Latest Version Date: 2017-07-17
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations. corporations, while local publicly owned electric utilities, as defined, are under the direction of their governing boards. The Public Utilities Act requires the commission PUC to review and accept, modify, or reject a procurement plan for each electrical corporation and requires the procurement plan to include specified elements, among them a showing that it will achieve certain objectives. Existing law requires the commission PUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner, and specifies the respective roles of electrical corporations and community choice aggregators in satisfying the portfolio needs for renewable integration.
This bill would specify that a diverse and balanced portfolio of resources includes an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity. The bill would additionally require the commission PUC to assess the need for, and benefits of, existing and future renewable baseload generation, and determine whether a procurement requirement for renewable baseload generation is necessary to meet the portfolio needs for renewable integration.
Existing law requires the commission PUC to adopt a process for each load-serving entity, defined as including electrical corporations, electric service providers, and community choice aggregators, to file an integrated resource plan and a schedule for periodic updates to the plan to ensure that load-serving entities accomplish specified objectives. Existing law requires each load-serving entity to prepare and file an integrated resource plan consistent with those objectives on a time schedule directed by the commission PUC and subject to commission PUC review.
This bill would require that an integrated resource plan ensure that the load-serving entity procures a balanced resource portfolio with an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity.
Existing law requires that the governing board of a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours adopt an integrated resource plan and a process for updating the plan at least once every 5 years to ensure the utility achieves specified objectives. Existing law requires that the integrated resource plan and any updates be filed with the State Energy Resources Conservation and Development Commission (Energy Commission), requires the Energy Commission to review the plans and plan updates, and, if the Energy Commission determines a plan or plan update is deficient, to provide recommendations to correct the deficiencies.
This bill would require the governing board, when reviewing the local publicly owned electric utilitys integrated resource plan, to evaluate the mix of resources in the utilitys total resource and renewable resource portfolios to ensure balanced portfolios with an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity. The bill would require the governing board to assess the need for, and benefits of, existing and new renewable baseload generation and consider whether to procure renewable baseload generation for the utility. By placing additional requirements upon local publicly owned electric utilities, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. The Public Utilities Act requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation and requires the procurement plan to include specified elements, among them a showing that it will achieve certain objectives. Existing law requires the commission to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner, and specifies the respective roles of electrical corporations and community choice aggregators in satisfying the portfolio needs for renewable integration.
This bill would specify that a diverse and balanced portfolio of resources includes an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity. The bill would additionally require the commission to assess the need for, and benefits of, existing and future renewable baseload generation, and determine whether a procurement requirement for renewable baseload generation is necessary to meet the portfolio needs for renewable integration.
Under existing law, the Public Utilities Commission (CPUC) has regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities, as defined, are under the direction of their governing boards. ExistingExisting law requires the CPUC commission to adopt a process for each load-serving entity, defined as including electrical corporations, electric service providers, and community choice aggregators, to file an integrated resource plan and a schedule for periodic updates to the plan to ensure that load-serving entities accomplish specified objectives. Existing law requires each load-serving entity to prepare and file an integrated resource plan consistent with those objectives on a time schedule directed by the CPUC commission and subject to CPUC commission review.
This bill would require the CPUC, when reviewing each load-serving entitys integrated resource plan, to evaluate the mix of resources in the load-serving entitys total resource and renewable resource portfolios to ensure balanced portfolios that an integrated resource plan ensure that the load-serving entity procures a balanced resource portfolio with an appropriate mix of peaking, dispatchable, baseload, firm, and as-available capacity and would require the CPUC to assess the need for, and benefits of, existing and new renewable baseload generation and consider whether to establish procurement requirements for renewable baseload generation. capacity.
Existing law requires that the governing board of a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours adopt an integrated resource plan and a process for updating the plan at least once every 5 years to ensure the utility achieves specified objectives. Existing law requires that the integrated resource plan and any updates be filed with the State Energy Resources Conservation and Development Commission (Energy Commission), requires the Energy Commission to review the plans and plan updates, and, if the Energy Commission determines a plan or plan update is deficient, to provide recommendations to correct the deficiencies.This bill would require the governing board, when reviewing the local publicly owned electric utilitys integrated resource plan, to evaluate the mix of resources in the utilitys total resource and renewable resource portfolios to ensure balanced portfolios with an appropriate mix of peaking, dispatchable, baseload, firm, and as-available capacity and would require the governing board to assess the need for, and benefits of, existing and new renewable baseload generation and consider whether to establish procurement requirements for renewable baseload generation for the utility. By placing additional requirements upon local publicly owned electric utilities, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Under existing law, the Public Utilities Commission (CPUC) has regulatory authority over public utilities, including electrical corporations, while local publicly owned electric utilities, as defined, are under the direction of their governing boards. Existing law requires the CPUC to adopt a process for each load-serving entity, defined as including electrical corporations, electric service providers, and community choice aggregators, to file an integrated resource plan and a schedule for periodic updates to the plan to ensure that load-serving entities accomplish specified objectives. Existing law requires each load-serving entity to prepare and file an integrated resource plan consistent with those objectives on a time schedule directed by the CPUC and subject to CPUC review.
This bill would require the CPUC, when reviewing each load-serving entitys integrated resource plan, to evaluate the mix of resources in the load-serving entitys total resource and renewable resource portfolios to ensure balanced portfolios with an appropriate mix of peaking, dispatchable, baseload, firm, and as-available capacity and would require the CPUC to assess the need for, and benefits of, existing and new renewable baseload generation and consider whether to establish procurement requirements for renewable baseload generation.
Existing law requires that the governing board of a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours adopt an integrated resource plan and a process for updating the plan at least once every 5 years to ensure the utility achieves specified objectives. Existing law requires that the integrated resource plan and any updates be filed with the State Energy Resources Conservation and Development Commission (Energy Commission), requires the Energy Commission to review the plans and plan updates, and, if the Energy Commission determines a plan or plan update is deficient, to provide recommendations to correct the deficiencies.
This bill would require the governing board, when reviewing the local publicly owned electric utilitys integrated resource plan, to evaluate the mix of resources in the utilitys total resource and renewable resource portfolios to ensure balanced portfolios with an appropriate mix of peaking, dispatchable, baseload, firm, and as-available capacity and would require the governing board to assess the need for, and benefits of, existing and new renewable baseload generation and consider whether to establish procurement requirements for renewable baseload generation for the utility. By placing additional requirements upon local publicly owned electric utilities, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Renewables Portfolio Standard Program requires the Public Utilities Commission to establish a renewables portfolio standard requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources, as defined, so that the total kilowatthours of those products sold to their retail end-use customers achieves 25% of retail sales by December 31, 2016, 33% by December 31, 2020, 40% by December 31, 2024, 45% by December 31, 2027, and 50% by December 31, 2030. The program additionally requires each local publicly owned electric utility, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources to achieve the procurement requirements established by the program. The program, consistent with the goals of procuring the least-cost and best-fit eligible renewable energy resources that meet project viability principles, requires that all retail sellers and local publicly owned electric utilities procure a balanced portfolio of electricity products from eligible renewable energy resources, as specified, referred to as the portfolio content requirements.This bill would require each retail seller and local publicly owned electric utility to procure not less than 20% of the electricity products required to be procured for overall compliance with the Renewables Portfolio Standard through renewable energy resource contracts from baseload renewable generation.Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime. By placing additional duties upon local publicly owned electric utilities, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for specified reasons.The California Renewables Portfolio Standard Program requires the Public Utilities Commission to establish a renewables portfolio standard requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources, as defined, so that the total kilowatthours of those products sold to their retail end-use customers achieves 25% of retail sales by December 31, 2016, 33% by December 31, 2020, 40% by December 31, 2024, 45% by December 31, 2027, and 50% by December 31, 2030. The program additionally requires each local publicly owned electric utility, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources to achieve the procurement requirements established by the program. The program, consistent with the goals of procuring the least-cost and best-fit eligible renewable energy resources that meet project viability principles, requires that all retail sellers and local publicly owned electric utilities procure a balanced portfolio of electricity products from eligible renewable energy resources, as specified, referred to as the portfolio content requirements.
This bill would require, for the compliance period ending December 31, 2024, and for each compliance period thereafter, that not less than 20% of the electricity products procured by a retail seller through renewable energy resource contracts executed on or after June 1, 2010, are for renewable baseload generation, as defined, and meet a specified product content requirement. require each retail seller and local publicly owned electric utility to procure not less than 20% of the electricity products required to be procured for overall compliance with the Renewables Portfolio Standard through renewable energy resource contracts from baseload renewable generation.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime. By placing additional duties upon local publicly owned electric utilities, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
The California Renewables Portfolio Standard Program requires the Public Utilities Commission to establish a renewables portfolio standard requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources, as defined, so that the total kilowatthours of those products sold to their retail end-use customers achieves 25% of retail sales by December 31, 2016, 33% by December 31, 2020, 40% by December 31, 2024, 45% by December 31, 2027, and 50% by December 31, 2030. The program additionally requires each local publicly owned electric utility, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources to achieve the procurement requirements established by the program. The program, consistent with the goals of procuring the least-cost and best-fit eligible renewable energy resources that meet project viability principles, requires that all retail sellers and local publicly owned electric utilities procure a balanced portfolio of electricity products from eligible renewable energy resources, as specified, referred to as the portfolio content requirements.
This bill would require, for the compliance period ending December 31, 2024, and for each compliance period thereafter, that not less than 20% of the electricity products procured by a retail seller through renewable energy resource contracts executed on or after June 1, 2010, are for renewable baseload generation, as defined, and meet a specified product content requirement.
The California Renewables Portfolio Standard Program requires the Public Utilities Commission to establish a renewables portfolio standard requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources, as defined, so that the total kilowatthours of those products sold to their retail end-use customers achieves 25% of retail sales by December 31, 2016, 33% by December 31, 2020, 40% by December 31, 2024, 45% by December 31, 2027, and 50% by December 31, 2030. The program additionally requires each local publicly owned electric utility, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources to achieve the procurement requirements established by the program. The program, consistent with the goals of procuring the least-cost and best-fit eligible renewable energy resources that meet project viability principles, requires that all retail sellers and local publicly owned electric utilities procure a balanced portfolio of electricity products from eligible renewable energy resources, as specified, referred to as the portfolio content requirements.
This bill would make nonsubstantive changes to the programs legislative findings and declarations. require, for the compliance period ending December 31, 2024, and for each compliance period thereafter, that not less than 20% of the electricity products procured by a retail seller through renewable energy resource contracts executed on or after June 1, 2010, are for renewable baseload generation, as defined, and meet a specified product content requirement.
The California Renewables Portfolio Standard Program requires the Public Utilities Commission to establish a renewables portfolio standard requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources, as defined, so that the total kilowatthours of those products sold to their retail end-use customers achieves 25% of retail sales by December 31, 2016, 33% by December 31, 2020, 40% by December 31, 2024, 45% by December 31, 2027, and 50% by December 31, 2030. The program additionally requires each local publicly owned electric utility, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources to achieve the procurement requirements established by the program.
This bill would make nonsubstantive changes to the programs legislative findings and declarations.
The commission shall do all of the following:
(a)(1)Identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. The portfolio shall rely upon zero carbon-emitting resources to the maximum extent reasonable and be designed to achieve any statewide greenhouse gas emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code) or any successor legislation.
(2)A diverse and balanced portfolio of resources shall include an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity.
(3)The commission shall assess the need for, and benefits of, existing and future renewable baseload generation, and determine whether a procurement requirement for renewable baseload generation is necessary to meet the need identified in paragraph (1).
(b)Direct each electrical corporation to include, as part of its proposed procurement plan, a strategy for procuring best-fit and least-cost resources to satisfy the portfolio needs identified by the commission pursuant to subdivision (a).
(c)Ensure that the net costs of any incremental renewable energy integration resources procured by an electrical corporation to satisfy the need identified in subdivision (a) are allocated on a fully nonbypassable basis consistent with the treatment of costs identified in paragraph (2) of subdivision (c) of Section 365.1.
(d)Permit community choice aggregators to submit proposals for satisfying their portion of the renewable integration need identified in subdivision (a). If the commission finds this need is best met through long-term procurement commitments for resources, community choice aggregators shall also be required to make long-term commitments for resources. The commission shall approve proposals pursuant to this subdivision if it finds all of the following:
(1)The resources proposed by a community choice aggregator will provide equivalent integration of renewable energy.
(2)The resources proposed by a community choice aggregator will promote the efficient achievement of state energy policy objectives, including reductions in greenhouse gas emissions.
(3)Bundled customers of an electrical corporation will be indifferent from the approval of the community choice aggregator proposals.
(e)Ensure that all costs resulting from nonperformance to satisfy the need in subdivision (a) or (d), as applicable, shall be borne by the electrical corporation or community choice aggregator that failed to perform.
SEC. 2.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(I)Procure a balanced resource portfolio with an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
SEC. 3.Section 9621 of the Public Utilities Code is amended to read:9621.(a)This section shall apply to a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing January 1, 2013.
(b)On or before January 1, 2019, the governing board of a local publicly owned electric utility shall adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility achieves all of the following:
(1)Meets the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each local publicly-owned electric utility that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(2)Ensures procurement of at least 50 percent eligible renewable energy resources by 2030 consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division 1.
(3)Meets the goals specified in subparagraphs (D) to (H), inclusive, of paragraph (1) of subdivision (a) of Section 454.52, and the goal specified in subparagraph (C) of paragraph (1) of subdivision (a) of Section 454.52, as that goal is applicable to each local publicly owned electric utility. A local publicly owned electric utility shall not, solely by reason of this paragraph, be subject to requirements otherwise imposed on electrical corporations.
(c)(1)The integrated resource plan shall address procurement for the following:
(A)Energy efficiency and demand response resources pursuant to Section 9615.
(B)Energy storage requirements pursuant to Chapter 7.7 (commencing with Section 2835) of Part 2 of Division 1.
(C)Transportation electrification.
(D)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.
(E)The resource adequacy requirements established pursuant to Section 9620.
(2)(A)The governing board of the local publicly owned electric utility may authorize all source procurement that includes various resource types, including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, to ensure that the local publicly owned electric utility procures the optimum resource mix that meets the objectives of subdivision (b).
(B)The governing board may authorize procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in subdivision (b), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(C)The governing board shall evaluate the mix of resources in its total resource and renewable resource portfolios to ensure a balanced portfolio with an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity. The governing board shall assess the need for, and benefits of, existing and new renewable baseload generation and consider whether to procure renewable baseload generation that meets the objectives specified in subdivision (b).
(d)A local publicly owned electric utility shall satisfy the notice and public disclosure requirements of subdivision (f) of Section 399.30 with respect to any integrated resource plan or plan update it considers.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The commission shall do all of the following:
(a)(1)Identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. The portfolio shall rely upon zero carbon-emitting resources to the maximum extent reasonable and be designed to achieve any statewide greenhouse gas emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code) or any successor legislation.
(2)A diverse and balanced portfolio of resources shall include an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity.
(3)The commission shall assess the need for, and benefits of, existing and future renewable baseload generation, and determine whether a procurement requirement for renewable baseload generation is necessary to meet the need identified in paragraph (1).
(b)Direct each electrical corporation to include, as part of its proposed procurement plan, a strategy for procuring best-fit and least-cost resources to satisfy the portfolio needs identified by the commission pursuant to subdivision (a).
(c)Ensure that the net costs of any incremental renewable energy integration resources procured by an electrical corporation to satisfy the need identified in subdivision (a) are allocated on a fully nonbypassable basis consistent with the treatment of costs identified in paragraph (2) of subdivision (c) of Section 365.1.
(d)Permit community choice aggregators to submit proposals for satisfying their portion of the renewable integration need identified in subdivision (a). If the commission finds this need is best met through long-term procurement commitments for resources, community choice aggregators shall also be required to make long-term commitments for resources. The commission shall approve proposals pursuant to this subdivision if it finds all of the following:
(1)The resources proposed by a community choice aggregator will provide equivalent integration of renewable energy.
(2)The resources proposed by a community choice aggregator will promote the efficient achievement of state energy policy objectives, including reductions in greenhouse gas emissions.
(3)Bundled customers of an electrical corporation will be indifferent from the approval of the community choice aggregator proposals.
(e)Ensure that all costs resulting from nonperformance to satisfy the need in subdivision (a) or (d), as applicable, shall be borne by the electrical corporation or community choice aggregator that failed to perform.
SEC. 2.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(I)Procure a balanced resource portfolio with an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
All matter omitted in this version of the bill appears in the bill as amended in the Assembly, May 1, 2017. (JR11)(a)The Legislature finds and declares all of the following:
(1)California is at the forefront of national and global efforts to address climate change through reducing emissions of greenhouse gases, and has prioritized reducing emissions of greenhouse gases in the electrical industry through the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 3.2 of Part 1 of Division 1 of the Public Utilities Code).
(2)The California Renewables Portfolio Standard Program has established an effective framework for increasing the use of electricity generated from renewable energy sources by requiring the states retail suppliers and local publicly owned electric utilities to obtain an increasing percentage of the electricity supplied to their retail customers from defined eligible renewable energy resources.
(3)The state is ahead of schedule to meet its 2020 goal of generating 33 percent of the electricity sold to retail end users from eligible renewable energy resources and has set the goal of generating 50 percent of the electricity sold to retail end users from those resources by 2030.
(4)Obtaining at least 50 percent of the electricity sold to retail end users in California from eligible renewable energy resources to meet the states objectives for clean energy, clean air, and pollution reduction depends on a reliable, resilient, and secure electrical grid.
(5)To meet the requirements of the California Renewables Portfolio Standard Program requires the development and procurement of a balanced portfolio of electricity products from eligible renewable energy resources that focuses on reliability, with incidental job creation and retention benefits.
(6)The California Renewables Portfolio Standard Program also requires that the renewables portfolio standard reflect an optimal mix of eligible renewable energy resources with deliverability characteristics that include peaking, dispatchable baseload, firm, and as-available capacity, a requirement that necessitates occasional adjustments to the optimal mix of resources as the renewables portfolio standard procurement requirements increase.
(7)The states Independent System Operator has noted increased spikes in the supply of electricity that are not aligned with when electricity is consumed, due to the high penetration of intermittent generation as the percentage of electricity supplied by eligible renewable energy resources has surpassed the 20 percent renewables portfolio standard requirement, and notes that this misalignment of electrical supply will increase as the state moves to a 33-percent and 50-percent renewables portfolio standard and beyond.
(8)The state has significant existing and potential sources of renewable energy that can provide baseload or flexible generation that not only can contribute to the achievement of the states clean energy goals, but will be needed to cost-effectively maintain electrical grid reliability and resiliency by counterbalancing increasing amounts of new, intermittent generation from eligible renewable energy resources.
(9)These existing and potential sources of renewable energy that offer baseload or flexible generation also provide significant, measurable, life-cycle reductions in emissions of greenhouse gases and short-lived climate pollutants by diversion of their fuel stocks from open burning or flaring and by preventing the discharge of treated wastewater into rivers by using it in energy production that would reduce overall emissions of greenhouse gases and short-lived climate pollutants before and during the generation of electricity.
(10)Many of the potential sources of renewable energy that offer baseload or flexible generation are located in areas of the state that are environmentally or economically challenged, including within the Counties of Lake, Sonoma, Imperial, and Inyo.
(11)These existing and potential sources of renewable energy that offer baseload or flexible generation are also major employers in the communities where projects are located, providing a diverse range of full-time employment opportunities as well as contractor jobs throughout all phases of development and operation.
(12)These existing and potential sources of renewable energy that offer baseload or flexible generation already or would make significant financial contributions to the local economies where they are located, including from the payment of property taxes, royalty payments, sales, and employment taxes.
(13)The states clean air and pollution reduction objectives have prioritized investment in, and achievement of, reductions in emissions of air contaminants and toxic air contaminants in environmentally and economically challenged regions of the state.
(14)The portfolio content requirements of the California Renewables Portfolio Standard Program place the highest priority upon procuring generation from eligible renewable energy resources that actually serve end users within California by establishing as the eligibility requirements for the first content category that the eligible renewable energy resource have a first point of interconnection with a California balancing authority, have a first point of interconnection with distribution facilities used to serve end users within a California balancing authority area, be scheduled from the eligible renewable energy resource into a California balancing authority without substituting electricity from another source, or have an agreement to dynamically transfer electricity to a California balancing authority.
(15)It is the intent of the Legislature that the objectives described in this act be achieved while protecting natural and working lands.
(b)This act shall be known, and may be cited, as the California Reliable Renewable Energy Act of 2017.
SEC. 2.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review. In reviewing each load-serving entitys integrated resource plan, the commission shall evaluate the mix of resources in the load-serving entitys total resource and renewable resource portfolios to ensure balanced portfolios with an appropriate mix of peaking, dispatchable, baseload, firm, and as-available capacity. The commission shall assess the need for, and benefits of, existing and new renewable baseload generation and consider whether to establish procurement requirements for renewable baseload generation that meets the goals specified in paragraph (1) of subdivision (a).
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
SEC. 3.Section 9621 of the Public Utilities Code is amended to read:9621.(a)This section shall apply to a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing January 1, 2013.
(b)On or before January 1, 2019, the governing board of a local publicly owned electric utility shall adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility achieves all of the following:
(1)Meets the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each local publicly-owned electric utility that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(2)Ensures procurement of at least 50 percent eligible renewable energy resources by 2030 consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division 1.
(3)Meets the goals specified in subparagraphs (D) to (H), inclusive, of paragraph (1) of subdivision (a) of Section 454.52, and the goal specified in subparagraph (C) of paragraph (1) of subdivision (a) of Section 454.52, as that goal is applicable to each local publicly owned electric utility. A local publicly owned electric utility shall not, solely by reason of this paragraph, be subject to requirements otherwise imposed on electrical corporations.
(c)(1)The integrated resource plan shall address procurement for the following:
(A)Energy efficiency and demand response resources pursuant to Section 9615.
(B)Energy storage requirements pursuant to Chapter 7.7 (commencing with Section 2835) of Part 2 of Division 1.
(C)Transportation electrification.
(D)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.
(E)The resource adequacy requirements established pursuant to Section 9620.
(2)(A)The governing board of the local publicly owned electric utility may authorize all source procurement that includes various resource types, including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, to ensure that the local publicly owned electric utility procures the optimum resource mix that meets the objectives of subdivision (b).
(B)The governing board may authorize procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in subdivision (b), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(C)The governing board shall evaluate the mix of resources in its total resource and renewable resource portfolios to ensure a balanced portfolio with an appropriate mix of peaking, dispatchable, baseload, firm, and as-available capacity. The governing board shall assess the need for, and benefits of, existing and new renewable baseload generation and consider whether to procure renewable baseload generation that meets the objectives specified in subdivision (b).
(d)A local publicly owned electric utility shall satisfy the notice and public disclosure requirements of subdivision (f) of Section 399.30 with respect to any integrated resource plan or plan update it considers.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
SEC. 2.Section 399.16.5 is added to the Public Utilities Code, to read:399.16.5.Each retail seller and local publicly owned electric utility shall procure not less than 20 percent of the electricity products required to be procured for overall compliance with the Renewables Portfolio Standard through renewable energy resource contracts from baseload renewable generation.SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.(a)The Legislature finds and declares all of the following:
(1)California is at the forefront of national and global efforts to address climate change through reducing emissions of greenhouse gases, and has prioritized reducing emissions of greenhouse gases in the electrical industry through the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 3.2 of Part 1 of Division 1 of the Public Utilities Code).
(2)The California Renewables Portfolio Standard Program has established an effective framework for increasing the use of electricity generated from renewable energy sources by requiring the states retail suppliers and local publicly owned electric utilities to obtain an increasing percentage of the electricity supplied to their retail customers from defined eligible renewable energy resources.
(3)The state is ahead of schedule to meet its 2020 goal of generating 33 percent of the electricity sold to retail end users from eligible renewable energy resources and has set the goal of generating 50 percent of the electricity sold to retail end users from those resources by 2030.
(4)Obtaining at least 50 percent of the electricity sold to retail end users in California from eligible renewable energy resources to meet the states objectives for clean energy, clean air, and pollution reduction depends on a reliable, resilient, and secure electrical grid.
(5)To meet the requirements of the California Renewables Portfolio Standard Program requires the development and procurement of a balanced portfolio of electricity products from eligible renewable energy resources that focuses on reliability, with incidental job creation and retention benefits.
(6)The California Renewables Portfolio Standard Program also requires that the renewables portfolio standard reflect an optimal mix of eligible renewable energy resources with deliverability characteristics that include peaking, dispatchable baseload, firm, and as-available capacity, a requirement that necessitates occasional adjustments to the optimal mix of resources as the renewables portfolio standard procurement requirements increase.
(7)The states Independent System Operator has noted increased spikes in the supply of electricity that are not aligned with when electricity is consumed, due to the high penetration of intermittent generation as the percentage of electricity supplied by eligible renewable energy resources has surpassed the 20 percent renewables portfolio standard requirement, and notes that this misalignment of electrical supply will increase as the state moves to a 33-percent and 50-percent renewables portfolio standard and beyond.
(8)The state has significant existing and potential sources of renewable energy that can provide baseload or flexible generation that not only can contribute to the achievement of the states clean energy goals, but will be needed to cost-effectively maintain electrical grid reliability and resiliency by counterbalancing increasing amounts of new, intermittent generation from eligible renewable energy resources.
(9)These existing and potential sources of renewable energy that offer baseload or flexible generation also provide significant, measurable, life-cycle reductions in emissions of greenhouse gases and short-lived climate pollutants by diversion of their fuel stocks from open burning or flaring and by preventing the discharge of treated wastewater into rivers by using it in energy production that would reduce overall emissions of greenhouse gases and short-lived climate pollutants before and during the generation of electricity.
(10)Many of the potential sources of renewable energy that offer baseload or flexible generation are located in areas of the state that are environmentally or economically challenged, including within the Counties of Lake, Sonoma, Imperial, and Inyo.
(11)These existing and potential sources of renewable energy that offer baseload or flexible generation are also major employers in the communities where projects are located, providing a diverse range of full-time employment opportunities as well as contractor jobs throughout all phases of development and operation.
(12)These existing and potential sources of renewable energy that offer baseload or flexible generation already or would make significant financial contributions to the local economies where they are located, including from the payment of property taxes, royalty payments, sales, and employment taxes.
(13)The states clean air and pollution reduction objectives have prioritized investment in, and achievement of, reductions in emissions of air contaminants and toxic air contaminants in environmentally and economically challenged regions of the state.
(14)The portfolio content requirements of the California Renewables Portfolio Standard Program place the highest priority upon procuring generation from eligible renewable energy resources that actually serve end users within California by establishing as the eligibility requirements for the first content category that the eligible renewable energy resource have a first point of interconnection with a California balancing authority, have a first point of interconnection with distribution facilities used to serve end users within a California balancing authority area, be scheduled from the eligible renewable energy resource into a California balancing authority without substituting electricity from another source, or have an agreement to dynamically transfer electricity to a California balancing authority.
(15)It is the objective of this act to achieve the clean energy, clean air, pollution reduction, and environmental justice goals of the state by ensuring, beginning June 1, 2010, that not less than 20 percent of the generation procured to meet the renewables portfolio standard procurement requirements shall be from dispatchable renewable baseload, firm, and as-available capacity resources, and that all necessary approvals for projects utilizing and developing eligible renewable energy resources in economically or environmentally disadvantaged areas of the state be expedited.(16)(15)It is the intent of the Legislature that the objectives described in paragraph (15) this act be achieved while protecting natural and working lands.
(b)This act shall be known, and may be cited, as the California Reliable Renewable Energy Act of 2017.
SEC. 2.Section 399.12 of the Public Utilities Code is amended to read:399.12.For purposes of this article, the following terms have the following meanings:(a)Conduit hydroelectric facility means a facility for the generation of electricity that uses only the hydroelectric potential of an existing pipe, ditch, flume, siphon, tunnel, canal, or other manmade conduit that is operated to distribute water for a beneficial use.(b)Balancing authority means the responsible entity that integrates resource plans ahead of time, maintains load-interchange generation balance within a balancing authority area, and supports interconnection frequency in real time.(c)Balancing authority area means the collection of generation, transmission, and loads within the metered boundaries of the area within which the balancing authority maintains the electrical load-resource balance.(d)California balancing authority is a balancing authority with control over a balancing authority area primarily located in this state and operating for retail sellers and local publicly owned electric utilities subject to the requirements of this article and includes the Independent System Operator (ISO) and a local publicly owned electric utility operating a transmission grid that is not under the operational control of the ISO. A California balancing authority is responsible for the operation of the transmission grid within its metered boundaries which is not limited by the political boundaries of the State of California.(e)Eligible renewable energy resource means an electrical generating facility that meets the definition of a renewable electrical generation facility in Section 25741 of the Public Resources Code, subject to the following:(1)(A)An existing small hydroelectric generation facility of 30 megawatts or less shall be eligible only if a retail seller or local publicly owned electric utility procured the electricity from the facility as of December 31, 2005. A new hydroelectric facility that commences generation of electricity after December 31, 2005, is not an eligible renewable energy resource if it will cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.(B)Notwithstanding subparagraph (A), a conduit hydroelectric facility of 30 megawatts or less that commenced operation before January 1, 2006, is an eligible renewable energy resource. A conduit hydroelectric facility of 30 megawatts or less that commences operation after December 31, 2005, is an eligible renewable energy resource so long as it does not cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.(C)A facility approved by the governing board of a local publicly owned electric utility prior to June 1, 2010, for procurement to satisfy renewable energy procurement obligations adopted pursuant to former Section 387, shall be certified as an eligible renewable energy resource by the Energy Commission pursuant to this article, if the facility is a renewable electrical generation facility as defined in Section 25741 of the Public Resources Code.(D)(i)A small hydroelectric generation unit with a nameplate capacity not exceeding 40 megawatts that is operated as part of a water supply or conveyance system is an eligible renewable energy resource only for the retail seller or local publicly owned electric utility that procured the electricity from the unit as of December 31, 2005. No unit shall be eligible pursuant to this subparagraph if an application for certification is submitted to the Energy Commission after January 1, 2013. Only one retail seller or local publicly owned electric utility shall be deemed to have procured electricity from a given unit as of December 31, 2005.(ii)Notwithstanding clause (i), a local publicly owned electric utility that meets the criteria of subdivision (j) of Section 399.30 may sell to another local publicly owned electric utility electricity from small hydroelectric generation units that qualify as eligible renewable energy resources under clause (i), and that electricity may be used by the local publicly owned electric utility that purchased the electricity to meet its renewables portfolio standard procurement requirements. The total of all those sales from the utility shall be no greater than 100,000 megawatthours of electricity.(iii)The amendments made to this subdivision by the act adding this subparagraph are intended to clarify existing law and apply from December 10, 2011.(2)(A)A facility engaged in the combustion of municipal solid waste shall not be considered an eligible renewable energy resource.(B)Subparagraph (A) does not apply to generation before January 1, 2017, from a facility located in Stanislaus County that was operational prior to September 26, 1996.(f)Procure means to acquire through ownership or contract.(g)Procurement entity means any person or corporation authorized by the commission to enter into contracts to procure eligible renewable energy resources on behalf of customers of a retail seller pursuant to subdivision (f) of Section 399.13.(h)Renewable baseload generation means an eligible renewable energy resource that is capable of generating electricity at a capacity factor greater than 60 percent, relative to its capacity, on an annual average basis.(i)(1)Renewable energy credit means a certificate of proof associated with the generation of electricity from an eligible renewable energy resource, issued through the accounting system established by the Energy Commission pursuant to Section 399.25, that one unit of electricity was generated and delivered by an eligible renewable energy resource.(2)Renewable energy credit includes all renewable and environmental attributes associated with the production of electricity from the eligible renewable energy resource, except for an emissions reduction credit issued pursuant to Section 40709 of the Health and Safety Code and any credits or payments associated with the reduction of solid waste and treatment benefits created by the utilization of biomass or biogas fuels.(3)(A)Electricity generated by an eligible renewable energy resource attributable to the use of nonrenewable fuels, beyond a de minimis quantity used to generate electricity in the same process through which the facility converts renewable fuel to electricity, shall not result in the creation of a renewable energy credit. The Energy Commission shall set the de minimis quantity of nonrenewable fuels for each renewable energy technology at a level of no more than 2 percent of the total quantity of fuel used by the technology to generate electricity. The Energy Commission may adjust the de minimis quantity for an individual facility, up to a maximum of 5 percent, if it finds that all of the following conditions are met:(i)The facility demonstrates that the higher quantity of nonrenewable fuel will lead to an increase in generation from the eligible renewable energy facility that is significantly greater than generation from the nonrenewable fuel alone.(ii)The facility demonstrates that the higher quantity of nonrenewable fuels will reduce the variability of its electrical output in a manner that results in net environmental benefits to the state.(iii)The higher quantity of nonrenewable fuel is limited to either natural gas or hydrogen derived by reformation of a fossil fuel.(B)Electricity generated by a small hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (A) or (D) of paragraph (1) of subdivision (e).(C)Electricity generated by a conduit hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (B) of paragraph (1) of subdivision (e).(D)Electricity generated by a facility engaged in the combustion of municipal solid waste shall not result in the creation of a renewable energy credit. This subparagraph does not apply to renewable energy credits that were generated before January 1, 2017, by a facility engaged in the combustion of municipal solid waste located in Stanislaus County that was operational prior to September 26, 1996, and sold pursuant to contacts entered into before January 1, 2017.(j)Renewables portfolio standard means the specified percentage of electricity generated by eligible renewable energy resources that a retail seller or a local publicly owned electric utility is required to procure pursuant to this article.(k)Retail seller means an entity engaged in the retail sale of electricity to end-use customers located within the state, including any of the following:(1)An electrical corporation, as defined in Section 218.(2)A community choice aggregator. A community choice aggregator shall participate in the renewables portfolio standard program subject to the same terms and conditions applicable to an electrical corporation.(3)An electric service provider, as defined in Section 218.3. The electric service provider shall be subject to the same terms and conditions applicable to an electrical corporation pursuant to this article. This paragraph does not impair a contract entered into between an electric service provider and a retail customer prior to the suspension of direct access by the commission pursuant to Section 80110 of the Water Code.(4)Retail seller does not include any of the following:(A)A corporation or person employing cogeneration technology or producing electricity consistent with subdivision (b) of Section 218.(B)The Department of Water Resources acting in its capacity pursuant to Division 27 (commencing with Section 80000) of the Water Code.(C)A local publicly owned electric utility.(l)WECC means the Western Electricity Coordinating Council of the North American Electric Reliability Corporation, or a successor to the corporation.SEC. 3.Section 399.16 of the Public Utilities Code is amended to read:399.16.(a)Various electricity products from eligible renewable energy resources located within the WECC transmission network service area shall be eligible to comply with the renewables portfolio standard procurement requirements in Section 399.15. These electricity products may be differentiated by their impacts on the operation of the grid in supplying electricity, as well as meeting the requirements of this article.(b)Consistent with the goals of procuring the least-cost and best-fit electricity products from eligible renewable energy resources that meet project viability principles adopted by the commission pursuant to paragraph (4) of subdivision (a) of Section 399.13 and that provide the benefits set forth in Section 399.11, a balanced portfolio of eligible renewable energy resources shall be procured consisting of the following portfolio content categories:(1)Eligible renewable energy resource electricity products that meet either of the following criteria:(A)Have a first point of interconnection with a California balancing authority, have a first point of interconnection with distribution facilities used to serve end users within a California balancing authority area, or are scheduled from the eligible renewable energy resource into a California balancing authority without substituting electricity from another source. The use of another source to provide real-time ancillary services required to maintain an hourly or subhourly import schedule into a California balancing authority shall be permitted, but only the fraction of the schedule actually generated by the eligible renewable energy resource shall count toward this portfolio content category.(B)Have an agreement to dynamically transfer electricity to a California balancing authority.(2)Firmed and shaped eligible renewable energy resource electricity products providing incremental electricity and scheduled into a California balancing authority.(3)Eligible renewable energy resource electricity products, or any fraction of the electricity generated, including unbundled renewable energy credits, that do not qualify under the criteria of paragraph (1) or (2).(c)In order to achieve a balanced portfolio, all retail sellers shall meet the following requirements for all procurement credited toward each compliance period:(1)Not less than 50 percent for the compliance period ending December 31, 2013, 65 percent for the compliance period ending December 31, 2016, and 75 percent for each compliance period thereafter, of the eligible renewable energy resource electricity products associated with contracts executed after June 1, 2010, shall meet the product content requirements of paragraph (1) of subdivision (b).(2)Not more than 25 percent for the compliance period ending December 31, 2013, 15 percent for the compliance period ending December 31, 2016, and 10 percent for each compliance period thereafter, of the eligible renewable energy resource electricity products associated with contracts executed after June 1, 2010, shall meet the product content requirements of paragraph (3) of subdivision (b).(3)Any renewable energy resources contracts executed on or after June 1, 2010, not subject to the limitations of paragraph (1) or (2), shall meet the product content requirements of paragraph (2) of subdivision (b).(4)For purposes of electric service providers only, the restrictions in this subdivision on crediting eligible renewable energy resource electricity products to each compliance period shall apply to contracts executed after January 13, 2011.(5)For the compliance period ending December 31, 2024, and for each compliance period thereafter, not less than 20 percent of the electricity products procured through renewable energy resource contracts executed on or after June 1, 2010, shall be for renewable baseload generation and shall meet the product content requirements of paragraph (1) of subdivision (b).(d)Any contract or ownership agreement originally executed prior to June 1, 2010, shall count in full toward the procurement requirements established pursuant to this article, if all of the following conditions are met:(1)The renewable energy resource was eligible under the rules in place as of the date when the contract was executed.(2)For an electrical corporation, the contract has been approved by the commission, even if that approval occurs after June 1, 2010.(3)Any contract amendments or modifications occurring after June 1, 2010, do not increase the nameplate capacity or expected quantities of annual generation, or substitute a different renewable energy resource. The duration of the contract may be extended if the original contract specified a procurement commitment of 15 or more years.(e)A retail seller may apply to the commission for a reduction of a procurement content requirement of subdivision (c). The commission may reduce a procurement content requirement of subdivision (c) to the extent the retail seller demonstrates that it cannot comply with that subdivision because of conditions beyond the control of the retail seller as provided in paragraph (5) of subdivision (b) of Section 399.15. The commission shall not, under any circumstance, reduce the obligation specified in paragraph (1) of subdivision (c) below 65 percent for any compliance period obligation after December 31, 2016.SEC. 2.Section 399.16.5 is added to the Public Utilities Code, to read:399.16.5.Each retail seller and local publicly owned electric utility shall procure not less than 20 percent of the electricity products required to be procured for overall compliance with the Renewables Portfolio Standard through renewable energy resource contracts from baseload renewable generation.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The Legislature finds and declares all of the following:
(1)California is at the forefront of national and global efforts to address climate change through reducing emissions of greenhouse gases, and has prioritized reducing emissions of greenhouse gases in the electrical industry through the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 3.2 of Part 1 of Division 1 of the Public Utilities Code).
(2)The California Renewables Portfolio Standard Program has established an effective framework for increasing the use of electricity generated from renewable energy sources by requiring the states retail suppliers and local publicly owned electric utilities to obtain an increasing percentage of the electricity supplied to their retail customers from defined eligible renewable energy resources.
(3)The state is ahead of schedule to meet its 2020 goal of generating 33 percent of the electricity sold to retail end users from eligible renewable energy resources and has set the goal of generating 50 percent of the electricity sold to retail end users from those resources by 2030.
(4)Obtaining at least 50 percent of the electricity sold to retail end users in California from eligible renewable energy resources to meet the states objectives for clean energy, clean air, and pollution reduction depends on a reliable, resilient, and secure electrical grid.
(5)To meet the requirements of the California Renewables Portfolio Standard Program requires the development and procurement of a balanced portfolio of electricity products from eligible renewable energy resources that focuses on reliability, with incidental job creation and retention benefits.
(6)The California Renewables Portfolio Standard Program also requires that the renewables portfolio standard reflect an optimal mix of eligible renewable energy resources with deliverability characteristics that include peaking, dispatchable baseload, firm, and as-available capacity, a requirement that necessitates occasional adjustments to the optimal mix of resources as the renewables portfolio standard procurement requirements increase.
(7)The states Independent System Operator has noted increased spikes in the supply of electricity that are not aligned with when electricity is consumed, due to the high penetration of intermittent generation as the percentage of electricity supplied by eligible renewable energy resources has surpassed the 20 percent renewables portfolio standard requirement, and notes that this misalignment of electrical supply will increase as the state moves to a 33-percent and 50-percent renewables portfolio standard and beyond.
(8)The state has significant existing and potential sources of renewable energy that can provide baseload or flexible generation that not only can contribute to the achievement of the states clean energy goals, but will be needed to cost-effectively maintain electrical grid reliability and resiliency by counterbalancing increasing amounts of new, intermittent generation from eligible renewable energy resources.
(9)These existing and potential sources of renewable energy that offer baseload or flexible generation also provide significant, measurable, life-cycle reductions in emissions of greenhouse gases and short-lived climate pollutants by diversion of their fuel stocks from open burning or flaring and by preventing the discharge of treated wastewater into rivers by using it in energy production that would reduce overall emissions of greenhouse gases and short-lived climate pollutants before and during the generation of electricity.
(10)Many of the potential sources of renewable energy that offer baseload or flexible generation are located in areas of the state that are environmentally or economically challenged, including within the Counties of Lake, Sonoma, Imperial, and Inyo.
(11)These existing and potential sources of renewable energy that offer baseload or flexible generation are also major employers in the communities where projects are located, providing a diverse range of full-time employment opportunities as well as contractor jobs throughout all phases of development and operation.
(12)These existing and potential sources of renewable energy that offer baseload or flexible generation already or would make significant financial contributions to the local economies where they are located, including from the payment of property taxes, royalty payments, sales, and employment taxes.
(13)The states clean air and pollution reduction objectives have prioritized investment in, and achievement of, reductions in emissions of air contaminants and toxic air contaminants in environmentally and economically challenged regions of the state.
(14)The portfolio content requirements of the California Renewables Portfolio Standard Program place the highest priority upon procuring generation from eligible renewable energy resources that actually serve end users within California by establishing as the eligibility requirements for the first content category that the eligible renewable energy resource have a first point of interconnection with a California balancing authority, have a first point of interconnection with distribution facilities used to serve end users within a California balancing authority area, be scheduled from the eligible renewable energy resource into a California balancing authority without substituting electricity from another source, or have an agreement to dynamically transfer electricity to a California balancing authority.
(15)It is the objective of this act to achieve the clean energy, clean air, pollution reduction, and environmental justice goals of the state by ensuring, beginning June 1, 2010, that not less than 20 percent of the generation procured to meet the renewables portfolio standard procurement requirements shall be from dispatchable renewable baseload, firm, and as-available capacity resources, and that all necessary approvals for projects utilizing and developing eligible renewable energy resources in economically or environmentally disadvantaged areas of the state be expedited.
(16)It is the intent of the Legislature that the objectives described in paragraph (15) be achieved while protecting natural and working lands.
(b)This act shall be known, and may be cited, as the California Reliable Renewable Energy Act of 2017.
SEC. 2.Section 399.12 of the Public Utilities Code is amended to read:399.12.For purposes of this article, the following terms have the following meanings:
(a)Conduit hydroelectric facility means a facility for the generation of electricity that uses only the hydroelectric potential of an existing pipe, ditch, flume, siphon, tunnel, canal, or other manmade conduit that is operated to distribute water for a beneficial use.
(b)Balancing authority means the responsible entity that integrates resource plans ahead of time, maintains load-interchange generation balance within a balancing authority area, and supports interconnection frequency in real time.
(c)Balancing authority area means the collection of generation, transmission, and loads within the metered boundaries of the area within which the balancing authority maintains the electrical load-resource balance.
(d)California balancing authority is a balancing authority with control over a balancing authority area primarily located in this state and operating for retail sellers and local publicly owned electric utilities subject to the requirements of this article and includes the Independent System Operator (ISO) and a local publicly owned electric utility operating a transmission grid that is not under the operational control of the ISO. A California balancing authority is responsible for the operation of the transmission grid within its metered boundaries which is not limited by the political boundaries of the State of California.
(e)Eligible renewable energy resource means an electrical generating facility that meets the definition of a renewable electrical generation facility in Section 25741 of the Public Resources Code, subject to the following:
(1)(A)An existing small hydroelectric generation facility of 30 megawatts or less shall be eligible only if a retail seller or local publicly owned electric utility procured the electricity from the facility as of December 31, 2005. A new hydroelectric facility that commences generation of electricity after December 31, 2005, is not an eligible renewable energy resource if it will cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(B)Notwithstanding subparagraph (A), a conduit hydroelectric facility of 30 megawatts or less that commenced operation before January 1, 2006, is an eligible renewable energy resource. A conduit hydroelectric facility of 30 megawatts or less that commences operation after December 31, 2005, is an eligible renewable energy resource so long as it does not cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(C)A facility approved by the governing board of a local publicly owned electric utility prior to June 1, 2010, for procurement to satisfy renewable energy procurement obligations adopted pursuant to former Section 387, shall be certified as an eligible renewable energy resource by the Energy Commission pursuant to this article, if the facility is a renewable electrical generation facility as defined in Section 25741 of the Public Resources Code.
(D)(i)A small hydroelectric generation unit with a nameplate capacity not exceeding 40 megawatts that is operated as part of a water supply or conveyance system is an eligible renewable energy resource only for the retail seller or local publicly owned electric utility that procured the electricity from the unit as of December 31, 2005. No unit shall be eligible pursuant to this subparagraph if an application for certification is submitted to the Energy Commission after January 1, 2013. Only one retail seller or local publicly owned electric utility shall be deemed to have procured electricity from a given unit as of December 31, 2005.
(ii)Notwithstanding clause (i), a local publicly owned electric utility that meets the criteria of subdivision (j) of Section 399.30 may sell to another local publicly owned electric utility electricity from small hydroelectric generation units that qualify as eligible renewable energy resources under clause (i), and that electricity may be used by the local publicly owned electric utility that purchased the electricity to meet its renewables portfolio standard procurement requirements. The total of all those sales from the utility shall be no greater than 100,000 megawatthours of electricity.
(iii)The amendments made to this subdivision by the act adding this subparagraph are intended to clarify existing law and apply from December 10, 2011.
(2)(A)A facility engaged in the combustion of municipal solid waste shall not be considered an eligible renewable energy resource.
(B)Subparagraph (A) does not apply to generation before January 1, 2017, from a facility located in Stanislaus County that was operational prior to September 26, 1996.
(f)Procure means to acquire through ownership or contract.
(g)Procurement entity means any person or corporation authorized by the commission to enter into contracts to procure eligible renewable energy resources on behalf of customers of a retail seller pursuant to subdivision (f) of Section 399.13.
(h)Renewable baseload generation means an eligible renewable energy resource that is capable of generating electricity at a capacity factor greater than 60 percent, relative to its capacity, on an annual average basis.
(i)(1)Renewable energy credit means a certificate of proof associated with the generation of electricity from an eligible renewable energy resource, issued through the accounting system established by the Energy Commission pursuant to Section 399.25, that one unit of electricity was generated and delivered by an eligible renewable energy resource.
(2)Renewable energy credit includes all renewable and environmental attributes associated with the production of electricity from the eligible renewable energy resource, except for an emissions reduction credit issued pursuant to Section 40709 of the Health and Safety Code and any credits or payments associated with the reduction of solid waste and treatment benefits created by the utilization of biomass or biogas fuels.
(3)(A)Electricity generated by an eligible renewable energy resource attributable to the use of nonrenewable fuels, beyond a de minimis quantity used to generate electricity in the same process through which the facility converts renewable fuel to electricity, shall not result in the creation of a renewable energy credit. The Energy Commission shall set the de minimis quantity of nonrenewable fuels for each renewable energy technology at a level of no more than 2 percent of the total quantity of fuel used by the technology to generate electricity. The Energy Commission may adjust the de minimis quantity for an individual facility, up to a maximum of 5 percent, if it finds that all of the following conditions are met:
(i)The facility demonstrates that the higher quantity of nonrenewable fuel will lead to an increase in generation from the eligible renewable energy facility that is significantly greater than generation from the nonrenewable fuel alone.
(ii)The facility demonstrates that the higher quantity of nonrenewable fuels will reduce the variability of its electrical output in a manner that results in net environmental benefits to the state.
(iii)The higher quantity of nonrenewable fuel is limited to either natural gas or hydrogen derived by reformation of a fossil fuel.
(B)Electricity generated by a small hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (A) or (D) of paragraph (1) of subdivision (e).
(C)Electricity generated by a conduit hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (B) of paragraph (1) of subdivision (e).
(D)Electricity generated by a facility engaged in the combustion of municipal solid waste shall not result in the creation of a renewable energy credit. This subparagraph does not apply to renewable energy credits that were generated before January 1, 2017, by a facility engaged in the combustion of municipal solid waste located in Stanislaus County that was operational prior to September 26, 1996, and sold pursuant to contacts entered into before January 1, 2017.
(j)Renewables portfolio standard means the specified percentage of electricity generated by eligible renewable energy resources that a retail seller or a local publicly owned electric utility is required to procure pursuant to this article.
(k)Retail seller means an entity engaged in the retail sale of electricity to end-use customers located within the state, including any of the following:
(1)An electrical corporation, as defined in Section 218.
(2)A community choice aggregator. A community choice aggregator shall participate in the renewables portfolio standard program subject to the same terms and conditions applicable to an electrical corporation.
(3)An electric service provider, as defined in Section 218.3. The electric service provider shall be subject to the same terms and conditions applicable to an electrical corporation pursuant to this article. This paragraph does not impair a contract entered into between an electric service provider and a retail customer prior to the suspension of direct access by the commission pursuant to Section 80110 of the Water Code.
(4)Retail seller does not include any of the following:
(A)A corporation or person employing cogeneration technology or producing electricity consistent with subdivision (b) of Section 218.
(B)The Department of Water Resources acting in its capacity pursuant to Division 27 (commencing with Section 80000) of the Water Code.
(C)A local publicly owned electric utility.
(l)WECC means the Western Electricity Coordinating Council of the North American Electric Reliability Corporation, or a successor to the corporation.
SEC. 3.Section 399.16 of the Public Utilities Code is amended to read:399.16.(a)Various electricity products from eligible renewable energy resources located within the WECC transmission network service area shall be eligible to comply with the renewables portfolio standard procurement requirements in Section 399.15. These electricity products may be differentiated by their impacts on the operation of the grid in supplying electricity, as well as meeting the requirements of this article.
(b)Consistent with the goals of procuring the least-cost and best-fit electricity products from eligible renewable energy resources that meet project viability principles adopted by the commission pursuant to paragraph (4) of subdivision (a) of Section 399.13 and that provide the benefits set forth in Section 399.11, a balanced portfolio of eligible renewable energy resources shall be procured consisting of the following portfolio content categories:
(1)Eligible renewable energy resource electricity products that meet either of the following criteria:
(A)Have a first point of interconnection with a California balancing authority, have a first point of interconnection with distribution facilities used to serve end users within a California balancing authority area, or are scheduled from the eligible renewable energy resource into a California balancing authority without substituting electricity from another source. The use of another source to provide real-time ancillary services required to maintain an hourly or subhourly import schedule into a California balancing authority shall be permitted, but only the fraction of the schedule actually generated by the eligible renewable energy resource shall count toward this portfolio content category.
(B)Have an agreement to dynamically transfer electricity to a California balancing authority.
(2)Firmed and shaped eligible renewable energy resource electricity products providing incremental electricity and scheduled into a California balancing authority.
(3)Eligible renewable energy resource electricity products, or any fraction of the electricity generated, including unbundled renewable energy credits, that do not qualify under the criteria of paragraph (1) or (2).
(c)In order to achieve a balanced portfolio, all retail sellers shall meet the following requirements for all procurement credited toward each compliance period:
(1)Not less than 50 percent for the compliance period ending December 31, 2013, 65 percent for the compliance period ending December 31, 2016, and 75 percent for each compliance period thereafter, of the eligible renewable energy resource electricity products associated with contracts executed after June 1, 2010, shall meet the product content requirements of paragraph (1) of subdivision (b).
(2)Not more than 25 percent for the compliance period ending December 31, 2013, 15 percent for the compliance period ending December 31, 2016, and 10 percent for each compliance period thereafter, of the eligible renewable energy resource electricity products associated with contracts executed after June 1, 2010, shall meet the product content requirements of paragraph (3) of subdivision (b).
(3)Any renewable energy resources contracts executed on or after June 1, 2010, not subject to the limitations of paragraph (1) or (2), shall meet the product content requirements of paragraph (2) of subdivision (b).
(4)For purposes of electric service providers only, the restrictions in this subdivision on crediting eligible renewable energy resource electricity products to each compliance period shall apply to contracts executed after January 13, 2011.
(5)For the compliance period ending December 31, 2024, and for each compliance period thereafter, not less than 20 percent of the electricity products procured through renewable energy resource contracts executed on or after June 1, 2010, shall be for renewable baseload generation and shall meet the product content requirements of paragraph (1) of subdivision (b).
(d)Any contract or ownership agreement originally executed prior to June 1, 2010, shall count in full toward the procurement requirements established pursuant to this article, if all of the following conditions are met:
(1)The renewable energy resource was eligible under the rules in place as of the date when the contract was executed.
(2)For an electrical corporation, the contract has been approved by the commission, even if that approval occurs after June 1, 2010.
(3)Any contract amendments or modifications occurring after June 1, 2010, do not increase the nameplate capacity or expected quantities of annual generation, or substitute a different renewable energy resource. The duration of the contract may be extended if the original contract specified a procurement commitment of 15 or more years.
(e)A retail seller may apply to the commission for a reduction of a procurement content requirement of subdivision (c). The commission may reduce a procurement content requirement of subdivision (c) to the extent the retail seller demonstrates that it cannot comply with that subdivision because of conditions beyond the control of the retail seller as provided in paragraph (5) of subdivision (b) of Section 399.15. The commission shall not, under any circumstance, reduce the obligation specified in paragraph (1) of subdivision (c) below 65 percent for any compliance period obligation after December 31, 2016.
(a)The Legislature finds and declares all of the following:
(1)California is at the forefront of national and global efforts to address climate change through reducing emissions of greenhouse gases, and has prioritized reducing emissions of greenhouse gases in the electrical industry through the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 3.2 of Part 1 of Division 1 of the Public Utilities Code).
(2)The California Renewables Portfolio Standard Program has established an effective framework for increasing the use of electricity generated from renewable energy sources by requiring the states retail suppliers and local publicly owned electric utilities to obtain an increasing percentage of the electricity supplied to their retail customers from defined eligible renewable energy resources.
(3)The state is ahead of schedule to meet its 2020 goal of generating 33 percent of the electricity sold to retail end users from eligible renewable energy resources and has set the goal of generating 50 percent of the electricity sold to retail end users from those resources by 2030.
(4)Obtaining at least 50 percent of the electricity sold to retail end users in California from eligible renewable energy resources to meet the states objectives for clean energy, clean air, and pollution reduction depends on a reliable, resilient, and secure electrical grid.
(5)To meet the requirements of the California Renewables Portfolio Standard Program requires the development and procurement of a balanced portfolio of electricity products from eligible renewable energy resources that focuses on reliability, with incidental job creation and retention benefits.
(6)The California Renewables Portfolio Standard Program also requires that the renewables portfolio standard reflect an optimal mix of eligible renewable energy resources with deliverability characteristics that include peaking, dispatchable baseload, firm, and as-available capacity, a requirement that necessitates occasional adjustments to the optimal mix of resources as the renewables portfolio standard procurement requirements increase.
(7)The states Independent System Operator has noted increased spikes in the supply of electricity that are not aligned with when electricity is consumed, due to the high penetration of intermittent generation as the percentage of electricity supplied by eligible renewable energy resources has surpassed the 20 percent renewables portfolio standard requirement, and notes that this misalignment of electrical supply will increase as the state moves to a 33-percent and 50-percent renewables portfolio standard and beyond.
(8)The state has significant existing and potential sources of renewable energy that can provide baseload or flexible generation that not only can contribute to the achievement of the states clean energy goals, but will be needed to cost-effectively maintain electrical grid reliability and resiliency by counterbalancing increasing amounts of new, intermittent generation from eligible renewable energy resources.
(9)These existing and potential sources of renewable energy that offer baseload or flexible generation also provide significant, measurable, life-cycle reductions in emissions of greenhouse gases and short-lived climate pollutants by diversion of their fuel stocks from open burning or flaring and by preventing the discharge of treated wastewater into rivers by using it in energy production that would reduce overall emissions of greenhouse gases and short-lived climate pollutants before and during the generation of electricity.
(10)Many of the potential sources of renewable energy that offer baseload or flexible generation are located in areas of the state that are environmentally or economically challenged, including within the Counties of Lake, Sonoma, Imperial, and Inyo.
(11)These existing and potential sources of renewable energy that offer baseload or flexible generation are also major employers in the communities where projects are located, providing a diverse range of full-time employment opportunities as well as contractor jobs throughout all phases of development and operation.
(12)These existing and potential sources of renewable energy that offer baseload or flexible generation already or would make significant financial contributions to the local economies where they are located, including from the payment of property taxes, royalty payments, sales, and employment taxes.
(13)The states clean air and pollution reduction objectives have prioritized investment in, and achievement of, reductions in emissions of air contaminants and toxic air contaminants in environmentally and economically challenged regions of the state.
(14)The portfolio content requirements of the California Renewables Portfolio Standard Program place the highest priority upon procuring generation from eligible renewable energy resources that actually serve end users within California by establishing as the eligibility requirements for the first content category that the eligible renewable energy resource have a first point of interconnection with a California balancing authority, have a first point of interconnection with distribution facilities used to serve end users within a California balancing authority area, be scheduled from the eligible renewable energy resource into a California balancing authority without substituting electricity from another source, or have an agreement to dynamically transfer electricity to a California balancing authority.
(15)It is the objective of this act to achieve the clean energy, clean air, pollution reduction, and environmental justice goals of the state by ensuring, beginning June 1, 2010, that not less than 20 percent of the generation procured to meet the renewables portfolio standard procurement requirements shall be from dispatchable renewable baseload, firm, and as-available capacity resources, and that all necessary approvals for projects utilizing and developing eligible renewable energy resources in economically or environmentally disadvantaged areas of the state be expedited.
(b)This act shall be known, and may be cited, as the California Reliable Renewable Energy Act of 2017.
SEC. 2.Section 399.12 of the Public Utilities Code is amended to read:399.12.For purposes of this article, the following terms have the following meanings:
(a)Conduit hydroelectric facility means a facility for the generation of electricity that uses only the hydroelectric potential of an existing pipe, ditch, flume, siphon, tunnel, canal, or other manmade conduit that is operated to distribute water for a beneficial use.
(b)Balancing authority means the responsible entity that integrates resource plans ahead of time, maintains load-interchange generation balance within a balancing authority area, and supports interconnection frequency in real time.
(c)Balancing authority area means the collection of generation, transmission, and loads within the metered boundaries of the area within which the balancing authority maintains the electrical load-resource balance.
(d)California balancing authority is a balancing authority with control over a balancing authority area primarily located in this state and operating for retail sellers and local publicly owned electric utilities subject to the requirements of this article and includes the Independent System Operator (ISO) and a local publicly owned electric utility operating a transmission grid that is not under the operational control of the ISO. A California balancing authority is responsible for the operation of the transmission grid within its metered boundaries which is not limited by the political boundaries of the State of California.
(e)Eligible renewable energy resource means an electrical generating facility that meets the definition of a renewable electrical generation facility in Section 25741 of the Public Resources Code, subject to the following:
(1)(A)An existing small hydroelectric generation facility of 30 megawatts or less shall be eligible only if a retail seller or local publicly owned electric utility procured the electricity from the facility as of December 31, 2005. A new hydroelectric facility that commences generation of electricity after December 31, 2005, is not an eligible renewable energy resource if it will cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(B)Notwithstanding subparagraph (A), a conduit hydroelectric facility of 30 megawatts or less that commenced operation before January 1, 2006, is an eligible renewable energy resource. A conduit hydroelectric facility of 30 megawatts or less that commences operation after December 31, 2005, is an eligible renewable energy resource so long as it does not cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(C)A facility approved by the governing board of a local publicly owned electric utility prior to June 1, 2010, for procurement to satisfy renewable energy procurement obligations adopted pursuant to former Section 387, shall be certified as an eligible renewable energy resource by the Energy Commission pursuant to this article, if the facility is a renewable electrical generation facility as defined in Section 25741 of the Public Resources Code.
(D)(i)A small hydroelectric generation unit with a nameplate capacity not exceeding 40 megawatts that is operated as part of a water supply or conveyance system is an eligible renewable energy resource only for the retail seller or local publicly owned electric utility that procured the electricity from the unit as of December 31, 2005. No unit shall be eligible pursuant to this subparagraph if an application for certification is submitted to the Energy Commission after January 1, 2013. Only one retail seller or local publicly owned electric utility shall be deemed to have procured electricity from a given unit as of December 31, 2005.
(ii)Notwithstanding clause (i), a local publicly owned electric utility that meets the criteria of subdivision (j) of Section 399.30 may sell to another local publicly owned electric utility electricity from small hydroelectric generation units that qualify as eligible renewable energy resources under clause (i), and that electricity may be used by the local publicly owned electric utility that purchased the electricity to meet its renewables portfolio standard procurement requirements. The total of all those sales from the utility shall be no greater than 100,000 megawatthours of electricity.
(iii)The amendments made to this subdivision by the act adding this subparagraph are intended to clarify existing law and apply from December 10, 2011.
(2)(A)A facility engaged in the combustion of municipal solid waste shall not be considered an eligible renewable energy resource.
(B)Subparagraph (A) does not apply to generation before January 1, 2017, from a facility located in Stanislaus County that was operational prior to September 26, 1996.
(f)Procure means to acquire through ownership or contract.
(g)Procurement entity means any person or corporation authorized by the commission to enter into contracts to procure eligible renewable energy resources on behalf of customers of a retail seller pursuant to subdivision (f) of Section 399.13.
(h)Renewable baseload generation means an eligible renewable energy resource that is capable of generating electricity at a capacity factor greater than 60 percent, relative to its capacity, on an annual average basis.
(h)(i)(1)Renewable energy credit means a certificate of proof associated with the generation of electricity from an eligible renewable energy resource, issued through the accounting system established by the Energy Commission pursuant to Section 399.25, that one unit of electricity was generated and delivered by an eligible renewable energy resource.
(2)Renewable energy credit includes all renewable and environmental attributes associated with the production of electricity from the eligible renewable energy resource, except for an emissions reduction credit issued pursuant to Section 40709 of the Health and Safety Code and any credits or payments associated with the reduction of solid waste and treatment benefits created by the utilization of biomass or biogas fuels.
(3)(A)Electricity generated by an eligible renewable energy resource attributable to the use of nonrenewable fuels, beyond a de minimis quantity used to generate electricity in the same process through which the facility converts renewable fuel to electricity, shall not result in the creation of a renewable energy credit. The Energy Commission shall set the de minimis quantity of nonrenewable fuels for each renewable energy technology at a level of no more than 2 percent of the total quantity of fuel used by the technology to generate electricity. The Energy Commission may adjust the de minimis quantity for an individual facility, up to a maximum of 5 percent, if it finds that all of the following conditions are met:
(i)The facility demonstrates that the higher quantity of nonrenewable fuel will lead to an increase in generation from the eligible renewable energy facility that is significantly greater than generation from the nonrenewable fuel alone.
(ii)The facility demonstrates that the higher quantity of nonrenewable fuels will reduce the variability of its electrical output in a manner that results in net environmental benefits to the state.
(iii)The higher quantity of nonrenewable fuel is limited to either natural gas or hydrogen derived by reformation of a fossil fuel.
(B)Electricity generated by a small hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (A) or (D) of paragraph (1) of subdivision (e).
(C)Electricity generated by a conduit hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (B) of paragraph (1) of subdivision (e).
(D)Electricity generated by a facility engaged in the combustion of municipal solid waste shall not result in the creation of a renewable energy credit. This subparagraph does not apply to renewable energy credits that were generated before January 1, 2017, by a facility engaged in the combustion of municipal solid waste located in Stanislaus County that was operational prior to September 26, 1996, and sold pursuant to contacts entered into before January 1, 2017.
(i)(j)Renewables portfolio standard means the specified percentage of electricity generated by eligible renewable energy resources that a retail seller or a local publicly owned electric utility is required to procure pursuant to this article.
(j)(k)Retail seller means an entity engaged in the retail sale of electricity to end-use customers located within the state, including any of the following:
(1)An electrical corporation, as defined in Section 218.
(2)A community choice aggregator. A community choice aggregator shall participate in the renewables portfolio standard program subject to the same terms and conditions applicable to an electrical corporation.
(3)An electric service provider, as defined in Section 218.3. The electric service provider shall be subject to the same terms and conditions applicable to an electrical corporation pursuant to this article. This paragraph does not impair a contract entered into between an electric service provider and a retail customer prior to the suspension of direct access by the commission pursuant to Section 80110 of the Water Code.
(4)Retail seller does not include any of the following:
(A)A corporation or person employing cogeneration technology or producing electricity consistent with subdivision (b) of Section 218.
(B)The Department of Water Resources acting in its capacity pursuant to Division 27 (commencing with Section 80000) of the Water Code.
(C)A local publicly owned electric utility.
(k)(l)WECC means the Western Electricity Coordinating Council of the North American Electric Reliability Corporation, or a successor to the corporation.
SEC. 3.Section 399.16 of the Public Utilities Code is amended to read:399.16.(a)Various electricity products from eligible renewable energy resources located within the WECC transmission network service area shall be eligible to comply with the renewables portfolio standard procurement requirements in Section 399.15. These electricity products may be differentiated by their impacts on the operation of the grid in supplying electricity, as well as meeting the requirements of this article.
(b)Consistent with the goals of procuring the least-cost and best-fit electricity products from eligible renewable energy resources that meet project viability principles adopted by the commission pursuant to paragraph (4) of subdivision (a) of Section 399.13 and that provide the benefits set forth in Section 399.11, a balanced portfolio of eligible renewable energy resources shall be procured consisting of the following portfolio content categories:
(1)Eligible renewable energy resource electricity products that meet either of the following criteria:
(A)Have a first point of interconnection with a California balancing authority, have a first point of interconnection with distribution facilities used to serve end users within a California balancing authority area, or are scheduled from the eligible renewable energy resource into a California balancing authority without substituting electricity from another source. The use of another source to provide real-time ancillary services required to maintain an hourly or subhourly import schedule into a California balancing authority shall be permitted, but only the fraction of the schedule actually generated by the eligible renewable energy resource shall count toward this portfolio content category.
(B)Have an agreement to dynamically transfer electricity to a California balancing authority.
(2)Firmed and shaped eligible renewable energy resource electricity products providing incremental electricity and scheduled into a California balancing authority.
(3)Eligible renewable energy resource electricity products, or any fraction of the electricity generated, including unbundled renewable energy credits, that do not qualify under the criteria of paragraph (1) or (2).
(c)In order to achieve a balanced portfolio, all retail sellers shall meet the following requirements for all procurement credited toward each compliance period:
(1)Not less than 50 percent for the compliance period ending December 31, 2013, 65 percent for the compliance period ending December 31, 2016, and 75 percent for each compliance period thereafter, of the eligible renewable energy resource electricity products associated with contracts executed after June 1, 2010, shall meet the product content requirements of paragraph (1) of subdivision (b).
(2)Not more than 25 percent for the compliance period ending December 31, 2013, 15 percent for the compliance period ending December 31, 2016, and 10 percent for each compliance period thereafter, of the eligible renewable energy resource electricity products associated with contracts executed after June 1, 2010, shall meet the product content requirements of paragraph (3) of subdivision (b).
(3)Any renewable energy resources contracts executed on or after June 1, 2010, not subject to the limitations of paragraph (1) or (2), shall meet the product content requirements of paragraph (2) of subdivision (b).
(4)For purposes of electric service providers only, the restrictions in this subdivision on crediting eligible renewable energy resource electricity products to each compliance period shall apply to contracts executed after January 13, 2011.
(5)For the compliance period ending December 31, 2024, and for each compliance period thereafter, not less than 20 percent of the electricity products procured through renewable energy resource contracts executed on or after June 1, 2010, shall be for renewable baseload generation and shall meet the product content requirements of paragraph (1) of subdivision (b).
(d)Any contract or ownership agreement originally executed prior to June 1, 2010, shall count in full toward the procurement requirements established pursuant to this article, if all of the following conditions are met:
(1)The renewable energy resource was eligible under the rules in place as of the date when the contract was executed.
(2)For an electrical corporation, the contract has been approved by the commission, even if that approval occurs after June 1, 2010.
(3)Any contract amendments or modifications occurring after June 1, 2010, do not increase the nameplate capacity or expected quantities of annual generation, or substitute a different renewable energy resource. The duration of the contract may be extended if the original contract specified a procurement commitment of 15 or more years.
(e)A retail seller may apply to the commission for a reduction of a procurement content requirement of subdivision (c). The commission may reduce a procurement content requirement of subdivision (c) to the extent the retail seller demonstrates that it cannot comply with that subdivision because of conditions beyond the control of the retail seller as provided in paragraph (5) of subdivision (b) of Section 399.15. The commission shall not, under any circumstance, reduce the obligation specified in paragraph (1) of subdivision (c) below 65 percent for any compliance period obligation after December 31, 2016.
SECTION 1.Section 399.11 of the Public Utilities Code is amended to read:399.11.The Legislature finds and declares all of the following:(a)In order to attain a target of generating 20 percent of total retail sales of electricity in California from eligible renewable energy resources by December 31, 2013, 33 percent by December 31, 2020, and 50 percent by December 31, 2030, it is the intent of the Legislature that the commission and the Energy Commission implement the California Renewables Portfolio Standard Program described in this article.(b)Achieving the renewables portfolio standard through the procurement of various electricity products from eligible renewable energy resources is intended to provide unique benefits to California, including all of the following, each of which independently justifies the program:(1)Displacing fossil fuel consumption within the state.(2)Adding new electrical generating facilities in the transmission network within the Western Electricity Coordinating Council service area.(3)Reducing air pollution, particularly criteria pollutant emissions and toxic air contaminants, in the state.(4)Meeting the states climate change goals by reducing emissions of greenhouse gases associated with electrical generation.(5)Promoting stable retail rates for electric service.(6)Meeting the states need for a diversified and balanced energy generation portfolio.(7)Assisting with meeting the states resource adequacy requirements.(8)Contributing to the safe and reliable operation of the electrical grid, including providing predictable electrical supply, voltage support, lower line losses, and congestion relief.(9)Implementing the states transmission and land use planning activities related to development of eligible renewable energy resources.(c)The California Renewables Portfolio Standard Program was intended to complement the Renewable Energy Resources Program administered by the Energy Commission and established pursuant to Chapter 8.6 (commencing with Section 25740) of Division 15 of the Public Resources Code.(d)New and modified electric transmission facilities may be necessary to facilitate the state achieving its renewables portfolio standard targets.(e)(1)Supplying electricity to California end-use customers that is generated by eligible renewable energy resources is necessary to improve Californias air quality and public health, particularly in disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code, and the commission shall ensure rates are just and reasonable, and are not significantly affected by the procurement requirements of this article. This electricity may be generated anywhere in the interconnected grid that includes many states, and areas of both Canada and Mexico.(2)This article requires generating resources located outside of California that are able to supply that electricity to California end-use customers to be treated identically to generating resources located within the state, without discrimination.(3)California electrical corporations have already executed, and the commission has approved, power purchase agreements with eligible renewable energy resources located outside of California that will supply electricity to California end-use customers. These resources will fully count toward meeting the renewables portfolio standard procurement requirements.The Legislature finds and declares all of the following:
(a)In order to attain a target of generating 20 percent of total retail sales of electricity in California from eligible renewable energy resources by December 31, 2013, 33 percent by December 31, 2020, and 50 percent by December 31, 2030, it is the intent of the Legislature that the commission and the Energy Commission implement the California Renewables Portfolio Standard Program described in this article.
(b)Achieving the renewables portfolio standard through the procurement of various electricity products from eligible renewable energy resources is intended to provide unique benefits to California, including all of the following, each of which independently justifies the program:
(1)Displacing fossil fuel consumption within the state.
(2)Adding new electrical generating facilities in the transmission network within the Western Electricity Coordinating Council service area.
(3)Reducing air pollution, particularly criteria pollutant emissions and toxic air contaminants, in the state.
(4)Meeting the states climate change goals by reducing emissions of greenhouse gases associated with electrical generation.
(5)Promoting stable retail rates for electric service.
(6)Meeting the states need for a diversified and balanced energy generation portfolio.
(7)Assistance Assisting with meeting the states resource adequacy requirements.
(8)Contributing to the safe and reliable operation of the electrical grid, including providing predictable electrical supply, voltage support, lower line losses, and congestion relief.
(9)Implementing the states transmission and land use planning activities related to development of eligible renewable energy resources.
(c)The California Renewables Portfolio Standard Program is was intended to complement the Renewable Energy Resources Program administered by the Energy Commission and established pursuant to Chapter 8.6 (commencing with Section 25740) of Division 15 of the Public Resources Code.
(d)New and modified electric transmission facilities may be necessary to facilitate the state achieving its renewables portfolio standard targets.
(e)(1)Supplying electricity to California end-use customers that is generated by eligible renewable energy resources is necessary to improve Californias air quality and public health, particularly in disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code, and the commission shall ensure rates are just and reasonable, and are not significantly affected by the procurement requirements of this article. This electricity may be generated anywhere in the interconnected grid that includes many states, and areas of both Canada and Mexico.
(2)This article requires generating resources located outside of California that are able to supply that electricity to California end-use customers to be treated identically to generating resources located within the state, without discrimination.
(3)California electrical corporations have already executed, and the commission has approved, power purchase agreements with eligible renewable energy resources located outside of California that will supply electricity to California end-use customers. These resources will fully count toward meeting the renewables portfolio standard procurement requirements.
|
Date
|
Status
|
|---|---|
| Sep 1, 2017 | In committee: Held under submission. |
| Aug 21, 2017 | In committee: Referred to APPR. suspense file. |
| Jul 17, 2017 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 13, 2017 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 11. Noes 0.) (July 10). |
| Jun 28, 2017 | In committee: Hearing postponed by committee. |
| Jun 14, 2017 | Referred to Com. on E., U. & C. |
| Jun 5, 2017 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Jun 1, 2017 | Read third time. Passed. Ordered to the Senate. (Ayes 75. Noes 0. Page 2045.) |
| May 26, 2017 | From committee: Do pass. (Ayes 17. Noes 0.) (May 26). |
| May 17, 2017 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| May 2, 2017 | Re-referred to Com. on APPR. |
| May 1, 2017 | From committee chair, with author's amendments: Amend, and re-refer to Com. on APPR. Read second time and amended. |
| Apr 27, 2017 | Re-referred to Com. on APPR. |
| Apr 26, 2017 | Read second time and amended. |
| Apr 25, 2017 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 9. Noes 1.) (April 24). |
| Apr 20, 2017 | Coauthors revised. |
| Apr 18, 2017 | Re-referred to Com. on U. & E. |
| Apr 17, 2017 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Mar 28, 2017 | Re-referred to Com. on U. & E. |
| Mar 27, 2017 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Mar 23, 2017 | Referred to Coms. on U. & E. and NAT. RES. |
| Feb 17, 2017 | From printer. May be heard in committee March 19. |
| Feb 16, 2017 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 21, 2017 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jul 10, 2017 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
|
| Jun 1, 2017 | AB 920 AGUIAR-CURRY Assembly Third Reading | Assembly Floor |
Passed |
|
| May 26, 2017 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 24, 2017 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
|
| Apr 19, 2017 | Do pass and be re-referred to the Committee on [Natural Resources] | Assembly Standing Committee on Utilities and Energy |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
SENATE COMMITTEE ON APPROPRIATIONS
Senator Ricardo Lara, Chair
2017 - 2018 Regular Session
AB 920 (Aguiar-Curry) - Electricity: procurement plans: integrated resource plans
Version: July 17, 2017 | Policy Vote: E., U., & C. 11 - 0 |
Urgency: No | Mandate: Yes |
Hearing Date: August 21, 2017 | Consultant: Narisha Bonakdar |
This bill meets the criteria for referral to the Suspense File.
Bill Summary:
- AB 920 directs the CPUC to assess the need for, and benefits of, existing and future renewable baseload generation and to determine whether a procurement mandate is needed to meet this bill’s description of a “diverse and balanced portfolio of resources.” The bill also adds elements to each elements to the Integrated Resource Plan (IRP).
Fiscal Impact:
- Ongoing costs of approximately $176,000 annually (Utilities Reimbursement Account) to the CPUC for staff and materials necessary to assess the need for, and benefits of, existing and future renewable baseload generation and to determine whether a procurement mandate is needed to meet this bill’s description of a “diverse and balanced portfolio of resources.
- Ongoing costs of approximately $176,000 annually (Utilities Reimbursement Account) to the CPUC for staff and materials necessary to assess the need for, and benefits of, existing and future renewable baseload generation and to determine whether a procurement mandate is needed to meet this bill’s description of a “diverse and balanced portfolio of resources.
Background:
The Clean Energy and Pollution Reduction Act (de León, Chapter 547, Statutes of 2015) (SB 350), among other things, established California’s 2030 greenhouse gas reduction target of 40 percent below 1990 levels. To help achieve this goal, SB 350 increased California’s renewable electricity procurement goal from 33 percent by 2020 to 50 percent by 2030, thus increasing the use of Renewables Portfolio Standard (RPS) eligible resources (e.g., solar, wind, biomass, geothermal, and others). In addition, SB 350 requires the state to double statewide energy efficiency savings in electricity and natural gas end uses by 2030.
To help ensure these goals are met and the greenhouse gas emission reductions are realized, large utilities were required to develop and submit Integrated Resource Plans (IRPs) detailing how each entity will meet their customers resource needs, reduce greenhouse gas emissions and ramp up the deployment of clean energy resources.
Integrated Resources Plans. IRPs are electricity system planning documents intended to ensure that POUs lay out the resource needs, policy goals, physical and operational constraints, and general priorities or proposed resource choices of an electric utility, including customer-side preferred resources. These plans will provide a framework to evaluate how utilities have chosen to align with greenhouse gas emission reduction targets as well as energy and other policy goals outlined in SB 350, including but not limited to:
Reductions in electricity sector greenhouse gas emissions commensurate with economy-wide reductions of 40 percent from 1990 levels by 2030;
A Renewables Portfolio Standard of 50 percent by 2030; and
Energy efficiency, gas use efficiency and vehicle electrification targets
What is a Baseload Renewable? Baseload renewable resources generally include biomass, geothermal, and small hydroelectric facilities and are characterized by the ability of the generating resources to deliver a minimum amount of electric power over a given period of time, at a steady rate. They also typically serve loads on an around-the-clock basis.
Baseload in Current Resource Portfolios. Geothermal and biomass resources account for about one-third of all renewable energy, on average, statewide. However, the market share for baseload renewables is falling as generation remains static or declines, while solar and wind are growing. Geothermal and biomass resources delivered by selected retail sellers and POUs, as a percentage of total renewable energy delivered, according to 2015 Power Content Labels are: Pacific Gas & Electric 30%; Southern California Edison 40%; San Diego Gas & Electric 6%; LA Department of Water and Power 29%; and, Sacramento Municipal Utility District 55%.
2016 Renewable Procurement. According to the California Energy Commission, 1,480 megawatt (MW) of new renewable capacity commenced operation in the first ten months of 2016. As of October 31, 2016, the resources and capacity were: solar PV, 1,440 MWs; solar thermal 0; wind 20 MWs; geothermal 0; and biomass 20 MWs.
Proposed Law:
This bill:
- States that a “diverse and balanced portfolio of resources” must include an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity.
- Adds to the elements the IRP is to achieve, “procure a balanced resource portfolio with an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity”.
- Requires the CPUC to assess the need for, and benefits of, existing and future renewable baseload generation, and determine whether a procurement requirement for renewable baseload generation is necessary.
- Requires the governing board of a publicly owned utility to assess the need for, and benefits of, existing and future renewable baseload generation, and determine whether a procurement requirement for renewable baseload generation is necessary.
Related Legislation:
SB 1139 (Hueso, 2014) would have required all retail sellers to procure a proportionate share of a statewide total of 500 megawatts of electricity generated by baseload geothermal powerplants constructed after January 1, 2015. The bill was approved by this committee on a 6-2 vote to later die on the Assembly Floor.
Staff Comments:
CPUC Fiscal. According to the CPUC, “assessing the need for and benefits of renewable baseload generation and consideration of procurement requirements for that type of generation would require an additional Public Utilities Regulatory Analyst V. This will potentially require stakeholder engagement and site visits in remote areas of California, including tribal lands.”
Specific tasks include developing a framework for analysis of baseload renewable resources, developing valuation scheme for measuring the benefits of baseload renewable resources, evaluating the mix of different resource types in integrated resource plans, stakeholder engagement, including travel to remote areas of California and meeting facilitation, and assisting the assigned ALJ with conducting pre-hearing conferences, evidentiary hearings, comment review, technical.
State mandate not reimbursable. This bill constitutes a state mandate. However, under the California Constitution, cost associated with the following are not reimbursable (1) legislation defining a new crime or changing an existing definition of a crime; (2) mandates on local agencies or school districts because have the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated; or (3) legislative mandates requested by the local affected agency.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Ben Hueso, Chair
2017 - 2018 Regular
Bill No: Hearing Date: 7/10/2017
Author: | |||
Version: | As Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill asserts that a “diverse and balanced portfolio of resources,” for purposes of an electrical corporation’s procurement plan, shall include “an appropriate mix of renewable capacity and makes a similar requirement of integrated resource plans.
ANALYSIS:
Existing law:
- Requires the California Public Utilities Commission (CPUC), in consultation with the California Independent System Operator (CAISO), to establish resource adequacy requirements for all load-serving entities (LSEs), defined to mean an electrical corporation (aka “investor-owned utility” or “IOU”), electric service provider (ESP) or community choice aggregator (CCA). (Public Utilities Code §380)
- Requires electric utilities to procure 50 percent of their retail sales of electricity from renewable energy by 2030. This is known as the Renewable Portfolio Standard (RPS). (Public Utilities Code §399.11 et seq.)
- Requires each electrical corporation to file with the CPUC a proposed electricity procurement plan that includes a strategy for procuring best-fit and least cost resource that satisfy the several defined elements of a diverse and balanced portfolio, as identified by the CPUC.
Requires the CPUC to review and accept, modify or reject each IOU’s proposed electricity procurement plan. (Public Utilities Code §454.5)
- Requires the CPUC to (a) identify a “diverse and balanced portfolio of resources” needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner and relies upon zero carbon-emitting resources to the maximum extent and (b) direct each IOU to include, as part of its proposed procurement plan described in (3) above, a strategy for procuring “best-fit and least-cost” resources to satisfy the portfolio needs identified by the CPUC pursuant to statute. (Public Utilities Code §454.51)
- Requires the CPUC to adopt a process for each LSE to file an integrated resource plan (IRP) to ensure they each meet the GHG emissions reduction targets for the electricity sector; procure at least 50 percent eligible renewable energy resources by December 31, 2030; and meet other goals and obligations.
Requires each load-serving entity to submit an IRP to the CPUC for review.
- In the case of an IOU, requires the IRP follow the provisions of Section 454.5.
- In the case of a CCA, requires the IRP be submitted to the CPUC for certification that the IRP achieves the following:
- Economic, reliability, environmental, security, and other benefits and performance characteristics specified in statute.
- A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
- The resource adequacy requirements established pursuant to Section 380.
- In the case of a CCA, requires the IRP be submitted to the CPUC for certification that the IRP achieves the following:
(Public Resources Code §454.52)
- Requires the governing board of a local publicly owned electric utility (POU) adopt an IRP and a process for updating the plan at least once every five years. (Public Resources Code §9621)
- Requires the IRP of a local POU be submitted to the California Energy Commission (CEC) and the CEC to review the IRP and determine if there are inconsistencies with statutory requirements. (Public Resources Code §9622)
This bill:
- Declares that a “diverse and balanced portfolio of resources,” which current law requires each IOU to include in its CPUC-approved procurement plan, shall include “an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity.”
- Directs the CPUC to assess the need for, and benefits of, existing and future renewable baseload generation and to determine whether a procurement mandate is needed to meet this bill’s description of a “diverse and balanced portfolio of resources.”
- Adds the following to the elements each LSE’s IRP is to achieve: procurement of a balanced resource portfolio with an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm and as-available capacity.
Background
Renewable Resource Procurement: a Balancing Act. For the past decade, statute has required retail sellers of electricity to procure increasing amounts of renewable energy resources. Statute provides considerable direction to the CPUC and the entities it regulates to guide this procurement. For example, statute directs each IOU to prepare a procurement plan that describes how the IOU will meet its customers demand for electricity while ensuring reliability, managing price risk, preferring cost-effective energy efficiency and demand reduction, meeting RPS requirements and, overall, maintaining a diversified procurement portfolio, among other mandatory goals. Additionally, statute directs the CPUC to require each IOU’s procurement plan to include a strategy for procuring “best-fit and least-cost” resources.
Generally, the state’s largest utilities have met their RPS through the procurement of electricity generated by wind power and, increasingly, solar energy. This tendency is reflected in several sources of energy data.
First, each retail seller of electricity must report the energy resources used to generate the electricity it sells. The seller presents this information in an annual “power content label,” which show the seller’s power mix and, for comparison, the power mix of California as a whole. Reviewing the power mix of California as a whole shows the utilities’ increasing reliance on wind and solar to meet RPS requirements:
RPS Eligible Renewable Resources as a Percentage of California Total Power Mix | |||||
2011 | 2012 | 2013 | 2014 | 2015 | |
Biomass and Waste | 2 | 2 | 3 | 3 | 3 |
Geothermal | 5 | 5 | 4 | 4 | 4 |
Small Hydro | 2 | 2 | 2 | 1 | 1 |
Solar | 0 | <1 | 2 | 4 | 6 |
Wind | 5 | 5 | 9 | 8 | 8 |
Source: http://www.energy.ca.gov/pcl/power_content_label.html. | |||||
A glance at the renewable power mix of the state’s largest electric utilities tells a similar story, though there is variation among utilities: an increasing reliance on wind and solar to meet RPS procurement requirements:
RPS Eligible Renewable Resources as a Percentage of Power Mix | |||||||||||||||||||||||||
LADWP | PG&E | SCE | SDG&E | SMUD | |||||||||||||||||||||
‘11 | ‘12 | ‘13 | ‘14 | ‘15 | ‘11 | ‘12 | ‘13 | ‘14 | ‘15 | ‘11 | ‘12 | ‘13 | ‘14 | ‘15 | ‘11 | ‘12 | ‘13 | ‘14 | ‘15 | ‘11 | ‘12 | ‘13 | ‘14 | ‘15 | |
Biomass and Waste | 3 | 5 | 6 | 5 | 4 | 4 | 4 | 4 | 5 | 4 | 1 | 1 | 1 | 1 | 1 | 1 | 4 | 3 | 1 | 2 | - | 12 | 12 | 12 | 11 |
Geothermal | 0 | 0 | 1 | 1 | 2 | 5 | 5 | 5 | 5 | 5 | 9 | 9 | 9 | 9 | 9 | 9 | 2 | 2 | 0 | 0 | - | 0 | 0 | 1 | 1 |
Small Hydro | 6 | 2 | 1 | 1 | 1 | 4 | 2 | 2 | 1 | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | - | 3 | 3 | 4 | 1 |
Solar | 0 | 0 | 1 | 1 | 3 | 0 | 2 | 5 | 9 | 11 | 1 | 1 | 1 | 4 | 7 | 1 | 3 | 4 | 15 | 18 | - | 2 | 3 | 3 | 3 |
Wind | 10 | 13 | 14 | 12 | 11 | 6 | 6 | 6 | 7 | 8 | 7 | 8 | 10 | 10 | 8 | 7 | 9 | 15 | 16 | 15 | - | 7 | 8 | 7 | 7 |
Source: http://www.energy.ca.gov/pcl/power_content_label.html.
| |||||||||||||||||||||||||
More notably, utility representatives anticipate meeting future RPS requirements through even greater procurement of solar energy, given the continued cost declines of electricity generated by use of solar photovoltaic technology.
It is questionable whether a power mix that increasingly relies on wind and solar energy can be described as diverse and balanced. This is because wind and solar power are intermittent resources, meaning the cannot be relied upon to produce electricity at all times, for example, when the sun does not shine or when the wind does not blow. Largely because of the state’s growing reliance on intermittent resources, many days of the year are characterized by a steep, elongated ramp up in demand for energy in the late afternoon (the “neck” of CAISO’s infamous “duck” curve) that cannot be met by renewable energy resources. To accommodate this ramp, the state has largely relied on gas-fired “peaker” powerplants that can be quickly turned on and produce electricity.
The CPUC has regularly approved procurement plans that include considerable amounts of wind and solar energy to meet RPS obligations. This is because, according to the CPUC, these resources are the least-cost renewable resources included in the IOU’s procurement plans. Critics contend that the CPUC’s process for considering procurement plans fails to accurately identify the renewable resources that represent both the least cost and the best fit. This is because, critics contend, the CPUC process fails to accurately consider all the costs associated with integrating such intermittent resources or of managing the grid supplied by large amounts of intermittent resources. Were to CPUC to accurately attribute integration costs and accurately consider grid management needs, critics conclude, then other renewable resources that reliably produce electricity—namely, geothermal energy and biomass—would fare better in the procurement process.
Turning It Up to Eleven. Over the years, the Legislature has approved numerous directives to the CPUC that it considers all costs of electricity generation and ensure procurement balances various and sometimes competing needs, including reliability, performance, environmental attributes and cost. For example, statute requires CPUC to identify a “diverse and balanced portfolio of resources that provides optimal integration of renewable energy.”
This bill builds upon this statutory body by defining what is meant by a “diverse and balanced portfolio of resources”: an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity. In addition, this bill directs the CPUC to assess the need for, and the benefits of existing and future renewable baseload generation, and consider whether a procurement requirement for such is needed. This bill also modifies the IRP process by directing the CPUC to ensure LSE’s file IRPs that “procure a balanced resource portfolio with an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm and as-available capacity.”
It is unclear why the author and proponents believe the language in this bill will result in different procurement outcomes. The CPUC believes itself to be faithfully implementing statutory direction, which tells the CPUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner, among many other goals. Similarly, the CPUC believes it approves IOU procurement plans that include procurement of resources that represent the best fit and least cost. And the CPUC must be developing the IPR process in a way that the CPUC believes achieves the many statutory requirements applicable to the IRP. This bill directs the CPUC to require IOU’s procurement plans include and “appropriate mix” of a variety of renewable energy capacity. Surely the CPUC does not believe it is approving procurement plans with inappropriate mixes of renewable capacity. Perhaps the CPUC is wrong. In any case, it is unclear why the Legislature should expect the language in this bill, which echoes existing statutory direction, to result in a different procurement outcome.
The author and bill proponents contend that baseload renewable resources—again, meaning, in practice, geothermal resources and biomass, mainly—provide numerous and valuable benefits beyond their ability to produce electricity using renewable resources. For example, proponents point to the long-term employment required by renewable baseload powerplants, environmental attributes of specific renewable baseload projects, like wastewater diversion, forest waste utilization and dust mitigation.
The CPUC procurement process is poorly able, maybe unable, to accurately value these nonenergy benefits. The legislative process, however, is not. The Legislature made just such a valuation last year when it approved the biomass procurement mandate. If the Legislature knows the degree to which it values the combined attributes of renewable baseload resources—renewable electricity, jobs, economic development, environmental mitigation, etc.—then it might want to consider simply telling the CPUC the outcome that the Legislature wants: a mandate applicable to all new procurement and to all retail sellers of electricity, public and private.
Oops. The current version of this bill includes a drafting error made during the amendment process. Specifically, the following language was erroneously removed from this bill:
The governing board shall evaluate the mix of resources in its total resource and renewable resource portfolios to ensure a balanced portfolio with an appropriate mix of peaking, dispatchable, baseload, firm, and as-available capacity. The governing board shall assess the need for, and benefits of, existing and new renewable baseload generation and consider whether to procure renewable baseload generation that meets the objectives specified in subdivision (b).
The author has requested this language be reinserted into this bill. The committee should consider granting the author’s request.
Prior/Related Legislation
SB 1139 (Hueso, 2014) would have required all retail sellers to procure a proportionate share of a statewide total of 500 megawatts of electricity generated by baseload geothermal powerplants constructed after January 1, 2015. The bill was approved by this committee on a 6-2 vote to later die on the Assembly Floor.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
Agra Trading, LLC
Almond Alliance of California
Ampersand Chowchilla Biomass LLC
Bioenergy Association of California
Blasting Solutions, Inc.
C. Amador Trucking
CA Low Carbon Fuel and Energy Coalition
California Air Pollution Control Officers Association
California Biomass Energy Alliance
California Chapters of the Solid Waste Association of North America
California Compost Coalition
California Farm Bureau Federation
California Forestry Association
California Licensed Forester’s Association
California Refuse Recycling Council
California State Association of Counties
Calpine Corporation
Collins Pine Company
Coso Geothermal Power Holdings, LLC
Cyrq Energy
Desert View Power, LLC
EnergySource LLC
Florin Perkins Public Disposal
Forest Landowners of California
Geothermal Energy Association
GreenWaste Recovery of San Jose
HL Power Company
Humboldt and Mendocino Redwood Companies
Humboldt County Board of Supervisors
Independent Energy Producers Association
J.T. Thorpe & Son, Inc.
K.Z.B.
Kern County
Lake County Board of Supervisors
Lake County Chamber of Commerce
Lake County Farm Bureau
Liquidmetal Coatings, LLC
Mahil Agg
Merced Power LLC
MidAmerican Geothermal
MidAmerican Renewables
Middletown Rancheria of Pomo Indians of California
Nicolaus Nut Company
Ormat Technologies
Placer County Air Pollution Control District
Rio Bravo Fresno
Rio Bravo Rocklin
Rural County Representatives of California
Shasta Forests Timberlands, LLC
Sonoma County Alliance
Sonoma County Board of Supervisors
StopWaste
SunWest Foods, Inc.
SunWest Milling, Inc.
Terra Novus Ag
The Coalition for Renewable Natural Gas
The Nature Conservancy
Tracy Biomass Power
Tubit Enterprises, Inc.
Tuolumne County Chamber of Commerce
Wadham Energy LP
Warner Mountain Lumber
Z-Best Composting
Zanker Recycling
Four Individuals
OPPOSITION:
350 Bay Area
Center for Biological Diversity
Pacific Gas and Electric Company, oppose unless amended
San Diego Gas and Electric Company
ARGUMENTS IN SUPPORT: According to the author:
AB 920 will help California better meet its energy, environmental, and economic goals by requiring the state’s load serving entities (LSEs) to procure balanced energy portfolios that include an appropriate mix of “baseload” renewable resources. Further, AB 920 requires the CPUC to determine if a procurement mandate is necessary to ensure an appropriate mix of baseload renewable resources are procured to serve the environmental, economic, and electricity needs of the state.
The predictable and relatively constant output of baseload renewable generation, such as geothermal and biomass, naturally complements intermittent resources such as wind and solar that generate only when it is windy or sunny. As procurement of wind and solar inevitably increases, AB 920 ensures the grid is balanced with baseload renewable energy. In addition to supporting grid reliability, existing and potential new baseload renewable resources are generally located in regions of the state with the greatest need for jobs, property taxes, pollution reduction, and other financial and environmental benefits provided by these resources. Ensuring the procurement of a diverse renewable portfolio will not only allow California to better meet its clean energy goals, but also the environmental and economic needs of the state.
ARGUMENTS IN OPPOSITION: Opponents, including the IOUs, argue the bill removes flexibility from procurement decision and inappropriately conflicts with the technology-neutral approach of the IRP process just instituted by the Legislature in SB 350. The result, opponents contend, will be more costs to ratepayers.
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 920
Author:(Aguiar-Curry)
As Amended Ver:May 1, 2017
Majority vote
Committee | Votes | Ayes | Noes |
Utilities | 11-0 | Holden, Burke, Chávez, Chen, Dahle, Fong, Eduardo Garcia, Quirk, Reyes, Santiago, Ting | |
Natural Resources | 9-1 | Cristina Garcia, Acosta, Chau, Eggman, Flora, Limón, McCarty, Muratsuchi, Mark Stone | Travis Allen |
Appropriations | 17-0 | Gonzalez Fletcher, Bigelow, Bloom, Bocanegra, Bonta, Brough, Calderon, McCarty, Quirk, Fong, Friedman, Gallagher, Eduardo Garcia, Gray, Muratsuchi, Obernolte, Reyes |
|
SUMMARY: Requires the California Public Utilities Commission (CPUC) and local publicly owned utilities (POUs), as part of the integrated resource planning process, to evaluate the mix of resources in electricity portfolios and assess the need for new renewable baseload generation. Specifically this bill:
- Requires the CPUC to evaluate the mix of generation resources in the electricity portfolios of investor-owned electric utilities, energy service providers and community choice aggregators (load-serving entities or LSEs) to ensure balanced portfolios with an appropriate mix of peaking, dispatchable, baseload, firm, and as-available capacity. The CPUC is also required to assess the need for, and benefits of, existing and new renewable baseload generation and consider whether to establish procurement requirements for renewable baseload generation as part of the integrated resource planning process.
- Requires the governing boards of POUs to evaluate the mix of generation resources in its total resource and renewable resource portfolios to ensure a balanced portfolio with an appropriate mix of peaking, dispatchable, baseload, firm, and as-available capacity. The governing boards must also assess the need for, and benefits of, existing and new renewable baseload generation and consider whether to procure renewable baseload generation as part of the integrated resource planning process.
- Makes legislative findings and expresses legislative intent concerning the Renewables Portfolio Standard Program and the attributes of renewable baseload generation resources.
FISCAL EFFECT: According to the Assembly Appropriations Committee, increased CPUC costs of approximately $171,000 (Public Utilities Reimbursement Fund) to review each LSE's integrated resource plan to evaluate the mix of resources contained in the plan and assess the need for, and benefits of, existing new renewable baseload generation and consider whether to establish procurement requirements for new renewable baseload generation.
COMMENTS:
What is a Baseload Renewable? Baseload renewable resources generally include biomass, geothermal, and small hydroelectric facilities and are characterized by the ability of the generating resources to deliver a minimum amount of electric power over a given period of time, at a steady rate. They also typically serve loads on an around-the-clock basis.
Integrated Resource Planning. Among the policies of SB 350 (De León and Leno), Chapter 547, Statutes of 2015, was the requirement that all LSEs and POUs prepare integrated resource plans. This "umbrella" process combines all of the state's electric procurement mandates, policies, and programs into one umbrella plan to achieve goals and ensure California has a safe, reliable, and cost-effective electricity supply.
The plans are intended to show how the LSEs and POUs will achieve GHG reduction targets and RPS mandates. And the plans must also at the same time: fulfill the obligation of just and reasonable rates, minimize ratepayer impact, ensure system and local reliability; strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities; enhance distribution systems and demand-side energy management; and minimize localized air pollutants and other GHG emission, with early priority on disadvantaged communities.
Baseload in Current Resource Portfolios. Geothermal and biomass resources account for about one-third of all renewable energy, on average, statewide. However, the market share for baseload renewables is falling as generation remains static or declines, while solar and wind are growing. Geothermal and biomass resources delivered by selected retail sellers and POUs, as a percentage of total renewable energy delivered, according to 2015 Power Content Labels are: Pacific Gas & Electric 30%; Southern California Edison 40%; San Diego Gas & Electric 6%; LA Department of Water and Power 29%; and, Sacramento Municipal Utility District 55%.
2016 Renewable Procurement. According to the California Energy Commission, 1,480 MW of new renewable capacity commenced operation in the first ten months of 2016. As of October 31, 2016, the resources and capacity were: solar PV, 1,440 MWs; solar thermal 0; wind 20 MWs; geothermal 0; and biomass 20 MWs.
Arguments in support. The author is concerned that baseload renewable resources are declining as part of the RPS program when the use should be increasing. The author intends the bill to facilitate energy, environmental, and economic goals by compelling LSEs and POUs to procure baseload renewable resources to meet the RPS requirements. She notes that, in addition to supporting grid reliability, existing and potential new baseload renewable resources are generally located in regions of the state with the greatest need for jobs, property taxes, pollution reduction, and other financial and environmental benefits.
Analysis Prepared by: Kellie Smith / U. & E. / (916) 319-2083 FN: 0000760
Date of Hearing: May 17, 2017
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez Fletcher, Chair
ABPCA Bill Id:AB 920
Author:(Aguiar-Curry) – As Amended Ver:May 1, 2017
Policy Committee: | Utilities and Energy | Vote: | 11 - 0 |
Natural Resources | 9 - 1 | ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill requires the California Public Utilities Commission and the governing board of local publicly-owned electric utilities (POU’s) to evaluate the mix of resources, when reviewing each load serving entity's (LSE’s) and POU’s total resource and renewable resource portfolio, to ensure balanced portfolios with an appropriate mix of peaking, dispatchable, baseload, firm, and as-available capacity.
Additionally, this bill requires the PUC and governing board of the local POU, as applicable, to assess the need for, and benefits of, existing and new renewable baseload generation and consider whether to establish procurement requirements for renewable baseload generation.
FISCAL EFFECT:
Increased PUC costs of approximately $171,000 (Public Utilities Reimbursement Fund) to review each LSE’s integrated resource plan to evaluate the mix of resources contained in the plan and assess the need for, and benefits of, existing new renewable baseload generation and consider whether to establish procurement requirements for new renewable baseload generation.
COMMENTS:
- Background. Among the policies of SB 350 (de Leon), Chapter 547, Statutes of 2015, was the requirement that all LSEs and POUs file integrated resource plans. The plans are intended to show how the LSEs and POUs will achieve greenhouse gas (GHG) reduction targets and renewable portfolio strategy (RPS) mandates. The plans are also required to:
- fulfill the obligation of just and reasonable rates;
- minimize ratepayer impact;
- ensure system and local reliability;
- strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems and local communities;
- enhance distribution systems and demand-side energy management; and
- minimize localized air pollutants and other GHG emission, with early priority on disadvantaged communities.
This process combines all of the state’s electric procurement mandates, policies, and programs into one umbrella plan to achieve goals and ensure California has a safe, reliable, and cost-effective electricity supply.
- The Current Level of Baseload Generation in the RPS Geothermal and biomass resources account for about one-third of all renewable energy on average statewide. However, their market share is falling as generation remains static or declines, while solar and wind are growing. Below are amounts of geothermal and biomass procured by selected retail sellers and POUs, as a percentage of total renewable energy, according to 2015 Power Content Labels:
- PG&E 30%;
- SCE 40%;
- SDG&E 6%;
- LADWP 29%; and,
- SMUD 55%
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: April 24, 2017
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Cristina Garcia, Chair
ABPCA Bill Id:AB 920 (
Author:Aguiar-Curry) – As Amended Ver:April 17, 2017
SUBJECT: California Renewables Portfolio Standard Program
SUMMARY: Requires no less than 20% of renewable electricity procured by retail sellers through contracts executed on or after June 1, 2010 be from "renewable baseload generation," as defined.
EXISTING LAW:
- Requires "retail sellers" of electricity, i.e., investor-owned utilities (IOUs), energy service providers (ESPs) and community choice aggregators (CCAs), as well as publicly-owned utilities (POUs), to procure 50% of their retail electricity sales from eligible renewable energy resources by 2030 and thereafter, including interim targets of 25% by 2016, 33% by 2020, 40% by 2024, and 45% by 2027.
- Provides that eligible renewable generation facilities must use biomass, solar thermal, photovoltaic, wind, geothermal, renewable fuel cells, small hydroelectric, digester gas, limited non-combustion municipal solid waste conversion, landfill gas, ocean wave, ocean thermal, or tidal current.
- Requires the Public Utilities Commission (PUC) to direct each IOU to include in its proposed procurement plan a strategy for procuring a diverse portfolio of resources that provide a reliable electricity supply, including renewable energy integration needs, using zero carbon-emitting resources to the maximum extent reasonable.
- Requires the PUC to adopt a process that provides criteria for the rank ordering and selection of "least-cost, best-fit" resources to comply with the RPS obligations on a total cost and best-fit basis.
- Requires each retail seller, in soliciting and procuring RPS resources, to consider the best-fit attributes of resource types that ensure a balanced resource mix to maintain the reliability of the electrical grid.
- Requires, after 2016, 75% of RPS resources for each retail seller to meet the requirements of product content category (PCC) 1, defined as renewable energy interconnected to the grid within, scheduled for direct delivery into, or dynamically transferred to, a California balancing authority.
THIS BILL:
- Requires, for each retail seller, beginning with the compliance period ending December 31, 2024, not less than 20% of the electricity procured through contracts executed on or after June 1, 2010, to be renewable baseload generation meeting PCC 1.
- Defines “renewable baseload generation” as an eligible renewable energy resource that is capable of generating electricity at a capacity factor greater than 60%, relative to its capacity, on an annual average basis (e.g., geothermal or biomass).
- Makes related findings.
FISCAL EFFECT: Unknown
COMMENTS:
- Author’s statement:
AB 920 will help California better meet its energy, environmental, and economic goals by requiring the state’s load serving entities (LSEs) to procure a minimum amount of “baseload” renewable resources to meet the existing RPS requirements. Specifically, AB 920 ensures that at least 20% of the renewable generation procured to meet the state’s RPS will come from baseload renewable resources.
The predictable and relatively constant output of baseload renewable generation, such as geothermal and biomass, naturally complements intermittent resources such as wind and solar that generate only when it is windy or sunny. As procurement of wind and solar inevitably increases, AB 920 ensures the grid is balanced with baseload renewable energy. In addition to supporting grid reliability, existing and potential new baseload renewable resources are generally located in regions of the state with the greatest need for jobs, property taxes, pollution reduction, and other financial and environmental benefits provided by these resources. Ensuring the procurement of a diverse renewable portfolio will not only allow California to better meet its clean energy goals, but also the environmental and economic needs of the state.
For example, the Geysers Geothermal Complex supports roughly 420 full-time jobs and is the largest property tax payer in both Sonoma and Lake Counties, the latter having one of the highest poverty rates in California.
Biomass facilities provide permanent jobs and create an end use for agricultural, forestry, and urban wood waste. Dead trees from fires, disease, and orchard turnover create large amounts of potentially hazardous organic waste. Without sufficient biomass plants available to accept this waste, open burning will continue to rise, increasing the emission of GHGs and air pollutants that have detrimental impacts on air quality and public health.
Currently, baseload sources such as geothermal, biomass, biogas or renewable natural gas account for over 30% of the existing renewables serving the state. AB 920’s modest procurement target of 20% is a lower percentage than the existing portion, but an important floor as the state moves towards its 50% goal by 2030.
- Utilities and Energy Committee amendments. This bill was approved by the U&E Committee on April 19, with an agreement to adopt amendments in this committee. The U&E amendments strike out the operative provisions of the bill (Sections 2 and 3), as well as paragraph 15 of the findings (page 4, lines 31-40). Instead, the amended bill would require each retail seller and POU to procure not less than 20% of its total RPS portfolio through contracts from baseload renewable generation.
The amendments apply the 20% baseload requirement to POUs, while allowing all retail sellers and POUs to count pre-2010 contracts, which includes most of the existing geothermal and biomass facilities, toward the 20% requirement. The amendments also leave "baseload renewable generation" undefined.
The effect of the amendments seems to be to reduce the requirement on retail sellers and POUs that hold pre-2010 contracts with geothermal and biomass facilities, primarily Pacific Gas and Electric, Southern California Edison, and POUs in Northern California.
- What's the current level of baseload generation in the RPS? Geothermal and biomass resources account for about one-third of all renewable energy on average statewide. However, their market share is falling as generation remains static or declines, while solar and wind are growing. Below are amounts of geothermal and biomass procured by selected retail sellers and POUs, as a percentage of total renewable energy, according to 2015 Power Content Labels[1]:
- PG&E 30%;
- SCE 40%;
- SDG&E 6%;
- LADWP 29%; and,
- SMUD 55%
This bill applies the 20% requirement to every retail seller and POU, and makes no provision for averaging. Apparently, it would require SDG&E to procure baseload renewable generation to increase its share from 6% to 20% even though SDG&E's current portfolio is already 35% renewable.
There are many smaller retail sellers and POUs with less than 20% geothermal and biomass for which this bill would present a significant requirement to procure baseload renewable generation, without regard to cost, need, or the composition of the rest of their portfolios.
REGISTERED SUPPORT / OPPOSITION:
Support
Agra Trading, LLC
Almond Alliance of California
CalForests
California Air Pollution control Officers Association
California Biomass Energy Alliance
California Compost Coalition
California Licenses Forester’s Association
CA Low Carbon Fuel and Energy Coalition
Calpine Corporation
Collins Pine Company
Greenleaf Power
HL Power Company
Humboldt and Mendocino Redwood Companies
Humboldt County Board of Supervisors
Independent Energy Producers
Kern County
Nature Conservancy
Ormat Technologies, Inc.
Placer County Air Pollution Control District
Rural County Representatives of California
Sacramento Valley Landowners Association
Shasta Forests Timberlands, LLC
SunWest Foods, Inc.
SunWest Milling, Inc.
Tracy Biomass Power
Tubit Enterprises, Inc.
Tuolumne County Chamber of Commerce
Wadham Energy LP
Warner Mountain Lumber
Opposition
California Wind Energy Association
Center for Biological Diversity
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
http://www.energy.ca.gov/pcl/labels/ ↑
Discussed in Hearing
Senate Standing Committee on Energy, Utilities and Communications
Assembly Floor
Assembly Standing Committee on Appropriations
Assembly Standing Committee on Natural Resources
Assembly Standing Committee on Utilities and Energy
Bill Author
Bill Co-Author(s):