AB 987: California Environmental Quality Act: sports and entertainment project.
- Session Year: 2017-2018
- House: Assembly
- Latest Version Date: 2018-09-30
(1)The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. CEQA establishes administrative procedures for the review and certification of the EIR for a project and judicial review procedures for any action or proceeding brought to challenge the lead agencys decision to certify the EIR or to grant project approvals.
This bill would authorize the Governor to certify a specified sports and entertainment project located in the City of Inglewood for streamlining if the project meets certain requirements. The bill would apply certain rules of court establishing procedures requiring actions or proceedings seeking judicial review pursuant to CEQA or the granting of project approvals, including any appeals therefrom, to be resolved within 270 days of the filing of the certified record of proceedings with the court to an action or proceeding seeking judicial review of the lead agencys action related to the certified project. The bill would require the lead agency to prepare concurrently the record of proceedings with the environmental review of the certified project, as specified. Because the lead agency would be required to prepare concurrently the record of proceedings, this bill would impose a state-mandated local program. If the lead agency fails to certify an EIR for the project before January 1, 2025, the bills provisions would be repealed as of that date.
(2)This bill would make legislative findings and declarations as to the necessity of a special statute for the City of Inglewood.
(3)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. CEQA establishes administrative procedures for the review and certification of the EIR for a project and judicial review procedures for any action or proceeding brought to challenge the lead agencys decision to certify the EIR or to grant project approvals.
This bill would authorize the Governor to certify a specified sports and entertainment project located in the City of Inglewood for streamlining if the project meets certain requirements. The bill would apply certain rules of court establishing procedures requiring actions or proceedings seeking judicial review pursuant to CEQA or the granting of project approvals, including any appeals therefrom, to be resolved within 270 days of the filing of the certified record of proceedings with the court to an action or proceeding seeking judicial review of the lead agencys action related to the certified project. The bill would require the lead agency to prepare concurrently the record of proceedings with the environmental review of the certified project, as specified. Because the lead agency would be required to prepare concurrently the record of proceedings, this bill would impose a state-mandated local program. If the lead agency fails to certify an EIR for the project before January 1, 2025, the bills provisions would be repealed as of that date.
(2)This bill would make legislative findings and declarations as to the necessity of a special statute for the City of Inglewood.
(3)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. CEQA establishes administrative procedures for the review and certification of the EIR for a project and judicial review procedures for any action or proceeding brought to challenge the lead agencys decision to certify the EIR or to grant project approvals.
This bill would authorize the Governor to certify a specified sports and entertainment project located in the City of Inglewood for streamlining if the project meets certain requirements. The bill would apply certain rules of court establishing procedures requiring actions or proceedings seeking judicial review pursuant to CEQA or the granting of project approvals, including any appeals therefrom, to be resolved within 270 days of the filing of the certified record of proceedings with the court to an action or proceeding seeking judicial review of the lead agencys action related to the certified project. The bill would require the lead agency to prepare concurrently the record of proceedings with the environmental review of the certified project, as specified. Because the lead agency would be required to prepare concurrently the record of proceedings, this bill would impose a state-mandated local program. If the lead agency fails to certify an EIR for the project before January 1, 2025, the bills provisions would be repealed as of that date.
(2)This bill would make legislative findings and declarations as to the necessity of a special statute for the City of Inglewood.
(3)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. CEQA establishes administrative procedures for the review and certification of the EIR for a project and judicial review procedures for any action or proceeding brought to challenge the lead agencys decision to certify the EIR or to grant project approvals.
This bill would authorize the Governor to certify a specified sports and entertainment project located in the City of Inglewood for streamlining if the project meets certain requirements. The bill would apply certain rules of court establishing procedures requiring actions or proceedings seeking judicial review pursuant to CEQA or the granting of project approvals, including any appeals thereform, therefrom, to be resolved within 270 days of the filing of the certified record of proceedings with the court to an action or proceeding seeking judicial review of the lead agencys action related to the certified project. The bill would require the lead agency to prepare concurrently the record of proceedings with the environmental review of the certified project, as specified. Because the lead agency would be required to prepare concurrently the record of proceedings, this bill would impose a state-mandated local program. If the lead agency fails to certify an EIR for the project before January 1, 2025, the bills provisions would be repealed as of that date.
(2)This bill would make legislative findings and declarations as to the necessity of a special statute for the City of Inglewood.
(3)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. CEQA establishes administrative procedures for the review and certification of the EIR for a project and judicial review procedures for any action or proceeding brought to challenge the lead agencys decision to certify the EIR or to grant project approvals.
This bill would establish specified administrative and judicial review procedures for the administrative and authorize the Governor to certify a specified sports and entertainment project located in the City of Inglewood for streamlining if the project meets certain requirements. The bill would apply certain rules of court establishing procedures requiring actions or proceedings seeking judicial review of the EIR and approvals granted for a project related to the development of a specified sports and entertainment project in the City of Inglewood meeting certain requirements. pursuant to CEQA or the granting of project approvals, including any appeals thereform, to be resolved within 270 days of the filing of the certified record of proceedings with the court to an action or proceeding seeking judicial review of the lead agencys action related to the certified project. The bill would require the lead agency to prepare concurrently the record of proceedings with the environmental review of the certified project, as specified. Because the lead agency would be required to use these alternative procedures for administrative review of the EIR if the project applicant so chooses, prepare concurrently the record of proceedings, this bill would impose a state-mandated local program. The bill would specify that the decisions of the lead agency regarding certain analyses and impacts shall not be considered as an abuse of discretion if certain conditions are met. If the lead agency fails to certify an EIR for the project before January 1, 2025, the bills provisions would be repealed as of that date.
(2)This bill would make legislative findings and declarations as to the necessity of a special statute for the City of Inglewood.
(3)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(1)The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. CEQA establishes administrative procedures for the review and certification of the EIR for a project and judicial review procedures for any action or proceeding brought to challenge the lead agencys decision to certify the EIR or to grant project approvals.
This bill would establish specified administrative and judicial review procedures for the administrative and judicial review of the EIR and approvals granted for a project related to the development of a specified sports and entertainment project in the City of Inglewood meeting certain requirements. Because the lead agency would be required to use these alternative procedures for administrative review of the EIR if the project applicant so chooses, this bill would impose a state-mandated local program. The bill would specify that the decisions of the lead agency regarding certain analyses and impacts shall not be considered as an abuse of discretion if certain conditions are met.
(2)This bill would make legislative findings and declarations as to the necessity of a special statute for the City of Inglewood.
(3)The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, the Water Quality, Supply, and Infrastructure Improvement Act of 2014, approved by the voters as Proposition 1 at the November 4, 2014, statewide general election, authorizes the issuance of general obligation bonds in the amount of $7,545,000,000 to finance a water quality, supply, and infrastructure improvement program. Proposition 1 authorizes the sum of $900,000,000 to be available, upon appropriation by the Legislature, for expenditures on, and competitive grants and loans for, projects to prevent or clean up the contamination of groundwater that serves or has served as a source of drinking water. Proposition 1 further specifies that $80,000,000 of those moneys may be used for grants for treatment and remediation activities that prevent or reduce contamination of groundwater that serves or has served as a source of drinking water, and that $100,000,000 of those moneys may be used for grants for the development and implementation of groundwater plans and projects in accordance with specified requirements.Existing law, the State General Obligation Bond Law (GO Bond Law), requires that the proceeds from the sale of any bonds issued pursuant to a bond act that incorporates the provisions of the GO Bond Law be used for specified purposes, including the costs of construction or acquisition of capital assets. Proposition 1 generally requires that any bonds prepared, executed, issued, sold, paid, and redeemed comply with the requirements of the GO Bond Law, except Proposition 1 provides that the capital asset requirement does not apply to bonds issued pursuant to that act to the extent that Proposition 1 authorizes bonds to be sold for a purpose that conflicts with the capital asset requirement.This bill would clarify that a conflict exists for purposes of that exception if any provision of this division authorizes, either expressly or by necessary implication, a project or program that would not result in the creation of a capital asset, including projects described above relating to prevention, cleanup, treatment, or remediation of contaminated groundwater, as well as to the development and implementation of groundwater plans and projects.Existing law, the Water Quality, Supply, and Infrastructure Improvement Act of 2014, approved by the voters as Proposition 1 at the November 4, 2014, statewide general election, authorizes the issuance of general obligation bonds in the amount of $7,545,000,000 to finance a water quality, supply, and infrastructure improvement program. Proposition 1 authorizes the sum of $900,000,000 to be available, upon appropriation by the Legislature, for expenditures on, and competitive grants and loans for, projects to prevent or clean up the contamination of groundwater that serves or has served as a source of drinking water. Proposition 1 further specifies that $80,000,000 of those moneys may be used for grants for treatment and remediation activities that prevent or reduce contamination of groundwater that serves or has served as a source of drinking water, and that $100,000,000 of those moneys may be used for grants for the development and implementation of groundwater plans and projects in accordance with specified requirements.
Existing law, the State General Obligation Bond Law (GO Bond Law), requires that the proceeds from the sale of any bonds issued pursuant to a bond act that incorporates the provisions of the GO Bond Law be used for specified purposes, including the costs of construction or acquisition of capital assets. Proposition 1 generally requires that any bonds prepared, executed, issued, sold, paid, and redeemed comply with the requirements of the GO Bond Law, except Proposition 1 provides that the capital asset requirement does not apply to bonds issued pursuant to that act to the extent that Proposition 1 authorizes bonds to be sold for a purpose that conflicts with the capital asset requirement.
This bill would clarify that a conflict exists for purposes of that exception if any provision of this division authorizes, either expressly or by necessary implication, a project or program that would not result in the creation of a capital asset, including projects described above relating to prevention, cleanup, treatment, or remediation of contaminated groundwater, as well as to the development and implementation of groundwater plans and projects.
Existing law, the Gambling Control Act, provides for the licensure and regulation of various legalized gambling activities and establishments by the California Gambling Control Commission and the investigation and enforcement of those activities and establishments by the Department of Justice. Existing law requires the commission to establish a 10-member Gaming Policy Advisory Committee for the purpose of discussing matters of controlled gambling regulatory policy and other relevant gambling-related issues. The committee is composed of representatives of controlled gambling licensees and members of the general public in equal numbers.This bill would increase the membership of the committee from 10 to 12 members, and would instead require the committee to be composed of 5 representatives of controlled gambling licensees, 5 members of the general public, and 2 representatives from the Department of Justice.Existing law, the Gambling Control Act, provides for the licensure and regulation of various legalized gambling activities and establishments by the California Gambling Control Commission and the investigation and enforcement of those activities and establishments by the Department of Justice. Existing law requires the commission to establish a 10-member Gaming Policy Advisory Committee for the purpose of discussing matters of controlled gambling regulatory policy and other relevant gambling-related issues. The committee is composed of representatives of controlled gambling licensees and members of the general public in equal numbers.
This bill would increase the membership of the committee from 10 to 12 members, and would instead require the committee to be composed of 5 representatives of controlled gambling licensees, 5 members of the general public, and 2 representatives from the Department of Justice.
(a)For the purposes of this section, the following definitions apply:
(1)Applicant means a private or public entity or its affiliates that proposes to implement and operate all or any portion of the project and its successors, heirs, and assignees.
(2)Arena means an 18,000 to 20,000 seat arena built as part of the project for National Basketball Association (NBA) basketball games and other spectator events.
(3)Project means a project located within the project area consisting of the arena plus practice and athletic training facility, and related parking and access, infrastructure construction or relocation, and landscaping, up to approximately 75,000 square feet of associated office space, up to approximately 30,000 square feet of sports medicine clinic space, up to approximately 70,000 square feet of ancillary retail, restaurant, community space, and similar uses, and a hotel, provided that the project meets all of the following:
(A)Receives Leadership in Energy and Environmental Design (LEED) gold certification for new construction within one year of the completion of the first NBA season.
(B)(i)Requires a transportation demand management program that, upon full implementation, will achieve and maintain a 15-percent reduction in the number of vehicle trips, collectively, by attendees, employees, visitors, and customers as compared to operations absent the transportation demand management program.
(ii)To accelerate and maximize vehicle trip reduction, each measure in the transportation demand management program shall be implemented as soon as feasible, so that no less than a 7.5-percent reduction in vehicle trips is achieved and maintained by the end of the first NBA season during which an NBA team has played at the arena.
(iii)A 15-percent reduction in vehicle trips shall be achieved and maintained as soon as feasible, but not later than January 1, 2030. The applicant shall verify achievement to the lead agency and the Office of Planning and Research.
(iv)If the applicant fails to verify achievement of the reduction required by clause (iii), the lead agency shall impose additional feasible measures to reduce vehicle trips by 17 percent, or, if there is a rail transit line with a stop within one-quarter mile of the arena, 20 percent, by January 1, 2035.
(C)Is located on an infill site.
(D)Is consistent with the general use designation, density, building intensity, and applicable policies specified for the project area in either a sustainable communities strategy or an alternative planning strategy for which the State Air Resources Board, pursuant to subparagraph (H) of paragraph (2) of subdivision (b) of Section 65080 of the Government Code, has accepted a metropolitan planning organizations determination that the sustainable communities strategy or the alternative planning strategy would, if implemented, achieve the greenhouse gas emission reduction targets.
(4)Project approval means any action, activity, ordinance, resolution, agreement, approval, determination, finding, or decision taken, adopted, or approved by the lead agency required to allow the applicant to commence the construction of the project, as determined by the lead agency.
(5)Project area means real property in the City of Inglewood consisting of approximately 35 acres, including without limitation areas generally described as follows:
(A)Assessor identification numbers 4032-001-005, 4032-001-006, 4032-001-033, 4032-001-035, 4032-001-039, 4032-001-048, 4032-001-049, 4032-001-900 to 4032-001-913, inclusive, 4032-002-913 to 4032-002-917, inclusive, 4032-003-912, 4032-003-914, 4032-003-915, 4032-004-913, 4032-004-914, 4032-007-035, 4032-007-900 to 4032-007-905, inclusive, 4032-008-001, 4032-008-002, 4032-008-006, 4032-008-034, 4032-008-035, 4032-008-900 to 4032-008-905, inclusive, 4032-008-907, 4032-008-908, 4034-004-026, 4034-004-900 to 4034-004-913, inclusive, and 4034-005-900 to 4034-005-912, inclusive.
(B)West 101st Street from its intersection with South Prairie Avenue westerly to a line approximately 488 feet west of the western boundary of South Prairie Avenue, and West 102nd Street from its intersection with South Prairie Avenue easterly to a line approximately 883 feet east of the eastern boundary of South Prairie Avenue.
(C)Adjacent areas or air space to be used for access.
(6)Transportation demand management program means a specific program of strategies, incentives, and tools to be implemented, with specific annual status reporting obligations in accordance with paragraph (5) of subdivision (b), to reduce vehicle trips by providing opportunities for event attendees and employees to choose sustainable travel options such as transit, bicycle riding, or walking. A specific program of strategies, incentives, and tools includes, but is not limited to, the following:
(A)Provision of shuttles, charter buses, or similar services from a major transit stop to serve arena events.
(B)Provision of onsite electric vehicle charging stations in excess of applicable requirements.
(C)Provision of dedicated parking for car-share or zero-emission vehicles, or both types of vehicle, in excess of applicable requirements.
(D)Provision of bicycle parking in excess of applicable requirements.
(E)Inclusion of a transit facility with area dedicated to shuttle bus staging, ride share, bicycle parking, and other modalities intended to reduce the use of single occupant vehicles.
(b)The Governor may certify the project for streamlining pursuant to this section if all the following conditions are met:
(1)The project will result in a minimum investment of one hundred million dollars ($100,000,000) in California upon completion of construction.
(2)(A)(i)The project creates high-wage, highly skilled jobs that pay prevailing wages and living wages, employs a skilled and trained workforce, as defined in subdivision (d) of Section 2601 of the Public Contract Code, provides construction jobs and permanent jobs for Californians, and helps reduce unemployment. For purposes of this subdivision, jobs that pay prevailing wages means that all construction workers employed in the execution of the project will receive at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code. If the project is certified for streamlining, the project applicant shall include this requirement in all contracts for the performance of the work.
(ii)Clause (i) does not apply to a contractor or subcontractor performing the work on the project that is subject to a project labor agreement requiring the payment of prevailing wages to all construction workers employed in the execution of the project and providing for enforcement of that obligation through an arbitration procedure. For purposes of this clause, project labor agreement has the same meaning as set forth in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(B)(i)If the project is certified pursuant to this subdivision, contractors and subcontractors shall pay to all construction workers employed in the execution of the project at least the general prevailing rate of per diem wages.
(ii)Except as provided in clause (iii), the obligation of the contractors and subcontractors to pay prevailing wages pursuant to subparagraph (A) may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of the project, or by an underpaid worker through an administrative complaint or civil action. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond or bonds issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.
(iii)Clause (ii) does not apply if all contractors and subcontractors performing work on the project are subject to a project labor agreement that requires the payment of prevailing wages to all construction workers employed in the execution of the project and provides for enforcement of that obligation through an arbitration procedure. For purposes of this subparagraph, project labor agreement has the same meaning as set forth in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(3)The project does not result in any net additional emission of greenhouse gases, including greenhouse gas emissions from employee transportation, as determined by the State Air Resources Board pursuant to Division 25.5 (commencing with Section 38500) of the Health and Safety Code. The State Air Resources Board is encouraged to make its determination no later than 120 calendar days after receiving an application for review of the methodology and calculations of the projects greenhouse gas emissions.
(4)The project applicant demonstrates compliance with the requirements of Chapters 12.8 (commencing with Section 42649) and 12.9 (commencing with Section 42649.8) of Part 3 of Division 30, as applicable.
(5)The project applicant has entered into a binding and enforceable agreement that all mitigation measures required pursuant to this division and any other environmental measures required by this section to certify the project under this section shall be conditions of approval of the project, and those conditions will be fully enforceable by the lead agency or another agency designated by the lead agency. In the case of environmental mitigation measures and any other environmental measures required by this section, the applicant agrees, as an ongoing obligation, that those measures will be monitored and enforced by the lead agency for the life of the obligation. The project applicant shall submit to the lead agency an annual status report on the implementation of the environmental mitigation measures and any other environmental measures required by this section.
(6)The project applicant agrees to pay any additional costs incurred by the courts in hearing and deciding any case subject to this section, including payment of the costs for the appointment of a special master if deemed appropriate by the court, in a form and manner specified by the Judicial Council, as provided in the Rules of Court adopted by the Judicial Council.
(7)The project applicant agrees to pay the costs of preparing the record of proceedings for the project concurrent with review and consideration of the project pursuant to this division, in a form and manner specified by the lead agency for the project.
(c)(1)The Governor may certify the project for streamlining pursuant to this section if it complies with the conditions specified in subdivision (b).
(2)(A)Prior to certifying the project, the Governor shall make a determination that each of the conditions specified in subdivision (b) has been met. These findings are not subject to judicial review.
(B)(i)If the Governor determines that the project is eligible for streamlining pursuant to this section, he or she shall submit that determination, and any supporting information, to the Joint Legislative Budget Committee for review and concurrence or nonconcurrence.
(ii)Within 30 days of receiving the determination, the Joint Legislative Budget Committee shall concur or nonconcur in writing on the determination.
(iii)If the Joint Legislative Budget Committee fails to concur or nonconcur on a determination by the Governor within 30 days of the submittal, the project is deemed to be certified.
(3)The guidelines issued pursuant to Chapter 6.5 (commencing with Section 21178) apply for the implementation of this section to the extent the guidelines are applicable and do not conflict with specific requirements of this section, including the transportation demand management program specified in subparagraph (B) of paragraph (3) of subdivision (a).
(d)(1)Within 10 days of the Governor certifying the project pursuant to this section, the lead agency shall, at the applicants expense, issue a public notice in no less than 12-point type stating the following:
THE APPLICANT HAS ELECTED TO PROCEED UNDER SECTION 21168.6.8 OF THE PUBLIC RESOURCES CODE, WHICH PROVIDES, AMONG OTHER THINGS, THAT ANY JUDICIAL ACTION CHALLENGING THE CERTIFICATION OF THE EIR OR THE APPROVAL OF THE PROJECT DESCRIBED IN THE EIR IS SUBJECT TO THE PROCEDURES SET FORTH IN SECTION 21186.6.8 OF THE PUBLIC RESOURCES CODE. A COPY OF SECTION 21168.6.8 OF THE PUBLIC RESOURCES CODE IS INCLUDED BELOW
(2)The public notice shall be distributed by the lead agency as required for public notices issued pursuant to paragraph (3) of subdivision (b) of Section 21092.
(e)Notwithstanding any other law, the procedures set forth in subdivision (f) shall apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of any environmental impact report for the project that is certified pursuant to this section or the granting of any project approvals.
(f)Rules 3.2220 to 3.2237, inclusive, of the California Rules of Court, as may be amended by the Judicial Council, shall apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of any environmental impact report for the project or granting of any project approvals to require the actions or proceeding, including any potential appeals therefrom, to be resolved, to the extent feasible, within 270 days of the filing of the certified record of proceedings with the court. On or before July 1, 2019, the Judicial Council shall amend the California Rules of Court, as necessary, to implement this subdivision.
(g)Notwithstanding any other law, the preparation and certification of the record of proceedings for the certified project shall be performed in the following manner:
(1)The lead agency for the project shall prepare the record of proceedings pursuant to this division concurrently with the administrative process.
(2)All documents and other materials placed in the record of proceedings shall be posted on, and be downloadable from, an Internet Web site maintained by the lead agency commencing with the date of the release of the draft environmental impact report.
(3)The lead agency shall make available to the public in a readily accessible electronic format the draft environmental impact report and all other documents submitted to, or relied on by, the lead agency in the preparation of the draft environmental impact report.
(4)A document prepared by the lead agency or submitted by the applicant after the date of the release of the draft environmental impact report that is a part of the record of the proceedings shall be made available to the public in a readily accessible electronic format within five business days after the document is released or received by the lead agency.
(5)The lead agency shall encourage written comments on the project to be submitted in a readily accessible electronic format, and shall make any comment available to the public in a readily accessible electronic format within five days of its receipt.
(6)Within 14 business days after the receipt of any comment that is not in an electronic format, the lead agency shall convert that comment into a readily accessible electronic format and make it available to the public in that format.
(7)Notwithstanding paragraphs (2) to (6), inclusive, documents submitted to or relied on by the lead agency that were not prepared specifically for the project and are copyright protected are not required to be made readily accessible in an electronic format. For those copyright-protected documents, the lead agency shall make an index of these documents available in an electronic format no later than the date of the release of the draft environmental impact report, or within five business days if the document is received or relied on by the lead agency after the release of the draft environmental impact report. The index shall specify the libraries or lead agency offices in which hardcopies of the copyrighted materials are available for public review.
(8)The lead agency shall certify the final record of proceedings within five days after the filing of the notice required by subdivision (a) of Section 21152.
(9)Any dispute arising from the record of proceedings shall be resolved by the superior court. Unless the superior court directs otherwise, a party disputing the content of the record shall file a motion to augment the record at the time it files its initial brief.
(10)The contents of the record of proceedings shall be as set forth in subdivision (e) of Section 21167.6.
(h)The provisions of this section are severable. If any provision of this section or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
(i)(1)If the lead agency fails to certify an environmental impact report for the project before January 1, 2025, this section shall become inoperative and is repealed as of that date.
(2)The lead agency shall notify the Secretary of State if it fails to certified the environmental impact report for the project before January 1, 2025.
(j)(1)As a condition of approval of the project, the lead agency shall require the applicant, with respect to any measures specific to the operation of the arena, to implement measures that will meet the requirements of this division by the end of the first NBA regular season or June of the first NBA regular season, whichever is later, during which an NBA team has played at the arena.
(2)To maximize public health, environmental, and employment benefits, the lead agency shall require measures that will reduce the emissions of greenhouse gases in the project area and in the neighboring communities of the arena.
(3)Not less than 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of paragraph (3) of subdivision (b) shall be from local, direct greenhouse gas emissions reduction measures, including, but not limited to, any of the following:
(A)Project design features or onsite reduction measures, or both design features and onsite reduction measures, that include, but are not limited to, any of the following:
(i)Implementing project design features that enable the arena to exceed the building energy efficiency standards set forth in Part 6 of Title 24 of the California Code of Regulations, except for 50 percent of emissions reductions attributable to design features necessary to meet the LEED gold certification requirement.
(ii)Requiring a transportation demand management program to reduce single-occupancy vehicular travel and vehicle miles traveled.
(iii)Providing onsite renewable energy generation, including a solar roof on the arena with a minimum peak generation capacity of 500 kilowatts.
(iv)Providing solar-ready roofs.
(v)Providing cool roofs and cool parking promoting cool surface treatment for new parking facilities.
(B)Off-site reduction measures in the neighboring communities, including, but not limited to, any of the following:
(i)Temporarily expanding the capacity of a public transit line, as appropriate, to serve arena events.
(ii)Paying its fair share of the cost of measures that expand the capacity of public transit, if appropriate, that is used by spectators attending arena events.
(iii)Providing funding to an off-site mitigation project consisting of replacing buses, trolleys, or other transit vehicles with zero-emission vehicles.
(iv)Providing off-site safety or other improvements for bicycles, pedestrians, and transit connections.
(v)Providing zero-emission transit buses to serve arena events and to meet other local transit needs, including senior and public school transportation services.
(vi)Undertaking or funding building retrofits to improve the energy efficiency of existing buildings.
(4)The applicant may obtain offset credits for up to 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirements of paragraph (3) of subdivision (b). The applicant shall, to the extent feasible, place the highest priority on the purchase of offset credits that produce emission reductions within the City of Inglewood or the boundaries of the South Coast Air Quality Management District. Any offset credits shall be verified by a third party accredited by the State Air Resources Board. Offset credits generated by a project located outside the United States shall not be used pursuant to this paragraph.
(k)As a condition of approval of the project, the lead agency shall require the applicant, in consultation with the South Coast Air Quality Management District, to implement measures that will achieve criteria pollutant and toxic air contaminant reductions over and above any emission reductions required by other laws or regulations in communities surrounding the project consistent with emission reduction measures that may be identified for those communities pursuant to Section 44391.2 of the Health and Safety Code.
(1)At a minimum, these measures shall achieve reductions of a minimum of 400 tons of oxides of nitrogen and 10 tons of PM2.5, as defined in Section 39047.2 of the Health and Safety Code, over 10 years following the commencement of construction of the project. Of these amounts, reductions of a minimum of 130 tons of oxides of nitrogen and 3 tons of PM2.5 shall be achieved within the first year following commencement of construction of the project. The reductions required pursuant to this paragraph are in addition to any other requirements imposed by other laws.
(2)If the project applicant can demonstrate and verify to the South Coast Air Quality Management District that it has invested at least thirty million dollars ($30,000,000) to achieve the requirements of this subdivision, the requirements of this subdivision shall be deemed met, so long as one-half of the reductions set forth in paragraph (1) are met.
(3)Greenhouse gas emissions reductions achieved pursuant to this subdivision shall count toward the applicants obligations under paragraph (3) of subdivision (j).
(l)This section does not apply to a project that proposes the construction of a new gambling establishment, as defined in Section 19805 of the Business and Professions Code or Section 337 of the Penal Code.
SEC. 2.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances of the construction of a major new sports venue in the City of Inglewood, a city with the largest minority population in the United States, which will provide essential economic stimulus.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)For the purposes of this section, the following definitions apply:
(1)Applicant means a private or public entity or its affiliates that proposes to implement and operate all or any portion of the project and its successors, heirs, and assignees.
(2)Arena means an 18,000 to 20,000 seat arena built as part of the project for National Basketball Association (NBA) basketball games and other spectator events.
(3)Project means a project located within the project area consisting of the arena plus practice and athletic training facility, and related parking and access, infrastructure construction or relocation, and landscaping, up to approximately 75,000 square feet of associated office space, up to approximately 30,000 square feet of sports medicine clinic space, up to approximately 70,000 square feet of ancillary retail, restaurant, community space, and similar uses, and a hotel, provided that the project meets all of the following:
(A)Receives Leadership in Energy and Environmental Design (LEED) gold certification for new construction within one year of the completion of the first NBA season.
(B)(i)Requires a transportation demand management program that, upon full implementation, will achieve and maintain a 15-percent reduction in the number of vehicle trips, collectively, by attendees, employees, visitors, and customers as compared to operations absent the transportation demand management program.
(ii)To accelerate and maximize vehicle trip reduction, each measure in the transportation demand management program shall be implemented as soon as feasible, so that no less than a 7.5-percent reduction in vehicle trips is achieved and maintained by the end of the first NBA season during which an NBA team has played at the arena.
(iii)A 15-percent reduction in vehicle trips shall be achieved and maintained as soon as feasible, but not later than January 1, 2030. The applicant shall verify achievement to the lead agency and the Office of Planning and Research.
(iv)If the applicant fails to verify achievement of the reduction required by clause (iii), the lead agency shall impose additional feasible measures to reduce vehicle trips by 17 percent, or, if there is a rail transit line with a stop within one-quarter mile of the arena, 20 percent, by January 1, 2035.
(C)Is located on an infill site.
(D)Is consistent with the general use designation, density, building intensity, and applicable policies specified for the project area in either a sustainable communities strategy or an alternative planning strategy for which the State Air Resources Board, pursuant to subparagraph (H) of paragraph (2) of subdivision (b) of Section 65080 of the Government Code, has accepted a metropolitan planning organizations determination that the sustainable communities strategy or the alternative planning strategy would, if implemented, achieve the greenhouse gas emission reduction targets.
(4)Project approval means any action, activity, ordinance, resolution, agreement, approval, determination, finding, or decision taken, adopted, or approved by the lead agency required to allow the applicant to commence the construction of the project, as determined by the lead agency.
(5)Project area means real property in the City of Inglewood consisting of approximately 35 acres, including without limitation areas generally described as follows:
(A)Assessor identification numbers 4032-001-005, 4032-001-006, 4032-001-033, 4032-001-035, 4032-001-039, 4032-001-048, 4032-001-049, 4032-001-900 to 4032-001-913, inclusive, 4032-002-913 to 4032-002-917, inclusive, 4032-003-912, 4032-003-914, 4032-003-915, 4032-004-913, 4032-004-914, 4032-007-035, 4032-007-900 to 4032-007-905, inclusive, 4032-008-001, 4032-008-002, 4032-008-006, 4032-008-034, 4032-008-035, 4032-008-900 to 4032-008-905, inclusive, 4032-008-907, 4032-008-908, 4034-004-026, 4034-004-900 to 4034-004-913, inclusive, and 4034-005-900 to 4034-005-912, inclusive.
(B)West 101st Street from its intersection with South Prairie Avenue westerly to a line approximately 488 feet west of the western boundary of South Prairie Avenue, and West 102nd Street from its intersection with South Prairie Avenue easterly to a line approximately 883 feet east of the eastern boundary of South Prairie Avenue.
(C)Adjacent areas or air space to be used for access.
(6)Transportation demand management program means a specific program of strategies, incentives, and tools to be implemented, with specific annual status reporting obligations in accordance with paragraph (5) of subdivision (b), to reduce vehicle trips by providing opportunities for event attendees and employees to choose sustainable travel options such as transit, bicycle riding, or walking. A specific program of strategies, incentives, and tools includes, but is not limited to, the following:
(A)Provision of shuttles, charter buses, or similar services from a major transit stop to serve arena events.
(B)Provision of onsite electric vehicle charging stations in excess of applicable requirements.
(C)Provision of dedicated parking for car-share or zero-emission vehicles, or both types of vehicle, in excess of applicable requirements.
(D)Provision of bicycle parking in excess of applicable requirements.
(E)Inclusion of a transit facility with area dedicated to shuttle bus staging, ride share, bicycle parking, and other modalities intended to reduce the use of single occupant vehicles.
(b)The Governor may certify the project for streamlining pursuant to this section if all the following conditions are met:
(1)The project will result in a minimum investment of one hundred million dollars ($100,000,000) in California upon completion of construction.
(2)(A)(i)The project creates high-wage, highly skilled jobs that pay prevailing wages and living wages, employs a skilled and trained workforce, as defined in subdivision (d) of Section 2601 of the Public Contract Code, provides construction jobs and permanent jobs for Californians, and helps reduce unemployment. For purposes of this subdivision, jobs that pay prevailing wages means that all construction workers employed in the execution of the project will receive at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code. If the project is certified for streamlining, the project applicant shall include this requirement in all contracts for the performance of the work.
(ii)Clause (i) does not apply to a contractor or subcontractor performing the work on the project that is subject to a project labor agreement requiring the payment of prevailing wages to all construction workers employed in the execution of the project and providing for enforcement of that obligation through an arbitration procedure. For purposes of this clause, project labor agreement has the same meaning as set forth in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(B)(i)If the project is certified pursuant to this subdivision, contractors and subcontractors shall pay to all construction workers employed in the execution of the project at least the general prevailing rate of per diem wages.
(ii)Except as provided in clause (iii), the obligation of the contractors and subcontractors to pay prevailing wages pursuant to subparagraph (A) may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of the project, or by an underpaid worker through an administrative complaint or civil action. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond or bonds issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.
(iii)Clause (ii) does not apply if all contractors and subcontractors performing work on the project are subject to a project labor agreement that requires the payment of prevailing wages to all construction workers employed in the execution of the project and provides for enforcement of that obligation through an arbitration procedure. For purposes of this subparagraph, project labor agreement has the same meaning as set forth in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(3)The project does not result in any net additional emission of greenhouse gases, including greenhouse gas emissions from employee transportation, as determined by the State Air Resources Board pursuant to Division 25.5 (commencing with Section 38500) of the Health and Safety Code. The State Air Resources Board is encouraged to make its determination no later than 120 calendar days after receiving an application for review of the methodology and calculations of the projects greenhouse gas emissions.
(4)The project applicant demonstrates compliance with the requirements of Chapters 12.8 (commencing with Section 42649) and 12.9 (commencing with Section 42649.8) of Part 3 of Division 30, as applicable.
(5)The project applicant has entered into a binding and enforceable agreement that all mitigation measures required pursuant to this division and any other environmental measures required by this section to certify the project under this section shall be conditions of approval of the project, and those conditions will be fully enforceable by the lead agency or another agency designated by the lead agency. In the case of environmental mitigation measures and any other environmental measures required by this section, the applicant agrees, as an ongoing obligation, that those measures will be monitored and enforced by the lead agency for the life of the obligation. The project applicant shall submit to the lead agency an annual status report on the implementation of the environmental mitigation measures and any other environmental measures required by this section.
(6)The project applicant agrees to pay any additional costs incurred by the courts in hearing and deciding any case subject to this section, including payment of the costs for the appointment of a special master if deemed appropriate by the court, in a form and manner specified by the Judicial Council, as provided in the Rules of Court adopted by the Judicial Council.
(7)The project applicant agrees to pay the costs of preparing the record of proceedings for the project concurrent with review and consideration of the project pursuant to this division, in a form and manner specified by the lead agency for the project.
(c)(1)The Governor may certify the project for streamlining pursuant to this section if it complies with the conditions specified in subdivision (b).
(2)(A)Prior to certifying the project, the Governor shall make a determination that each of the conditions specified in subdivision (b) has been met. These findings are not subject to judicial review.
(B)(i)If the Governor determines that the project is eligible for streamlining pursuant to this section, he or she shall submit that determination, and any supporting information, to the Joint Legislative Budget Committee for review and concurrence or nonconcurrence.
(ii)Within 30 days of receiving the determination, the Joint Legislative Budget Committee shall concur or nonconcur in writing on the determination.
(iii)If the Joint Legislative Budget Committee fails to concur or nonconcur on a determination by the Governor within 30 days of the submittal, the project is deemed to be certified.
(3)The guidelines issued pursuant to Chapter 6.5 (commencing with Section 21178) apply for the implementation of this section to the extent the guidelines are applicable and do not conflict with specific requirements of this section, including the transportation demand management program specified in subparagraph (B) of paragraph (3) of subdivision (a).
(d)(1)Within 10 days of the Governor certifying the project pursuant to this section, the lead agency shall, at the applicants expense, issue a public notice in no less than 12-point type stating the following:
THE APPLICANT HAS ELECTED TO PROCEED UNDER SECTION 21168.6.8 OF THE PUBLIC RESOURCES CODE, WHICH PROVIDES, AMONG OTHER THINGS, THAT ANY JUDICIAL ACTION CHALLENGING THE CERTIFICATION OF THE EIR OR THE APPROVAL OF THE PROJECT DESCRIBED IN THE EIR IS SUBJECT TO THE PROCEDURES SET FORTH IN SECTION 21186.6.8 OF THE PUBLIC RESOURCES CODE. A COPY OF SECTION 21168.6.8 OF THE PUBLIC RESOURCES CODE IS INCLUDED BELOW
(2)The public notice shall be distributed by the lead agency as required for public notices issued pursuant to paragraph (3) of subdivision (b) of Section 21092.
(e)Notwithstanding any other law, the procedures set forth in subdivision (f) shall apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of any environmental impact report for the project that is certified pursuant to this section or the granting of any project approvals.
(f)Rules 3.2220 to 3.2237, inclusive, of the California Rules of Court, as may be amended by the Judicial Council, shall apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of any environmental impact report for the project or granting of any project approvals to require the actions or proceeding, including any potential appeals therefrom, to be resolved, to the extent feasible, within 270 days of the filing of the certified record of proceedings with the court. On or before July 1, 2019, the Judicial Council shall amend the California Rules of Court, as necessary, to implement this subdivision.
(g)Notwithstanding any other law, the preparation and certification of the record of proceedings for the certified project shall be performed in the following manner:
(1)The lead agency for the project shall prepare the record of proceedings pursuant to this division concurrently with the administrative process.
(2)All documents and other materials placed in the record of proceedings shall be posted on, and be downloadable from, an Internet Web site maintained by the lead agency commencing with the date of the release of the draft environmental impact report.
(3)The lead agency shall make available to the public in a readily accessible electronic format the draft environmental impact report and all other documents submitted to, or relied on by, the lead agency in the preparation of the draft environmental impact report.
(4)A document prepared by the lead agency or submitted by the applicant after the date of the release of the draft environmental impact report that is a part of the record of the proceedings shall be made available to the public in a readily accessible electronic format within five business days after the document is released or received by the lead agency.
(5)The lead agency shall encourage written comments on the project to be submitted in a readily accessible electronic format, and shall make any comment available to the public in a readily accessible electronic format within five days of its receipt.
(6)Within 14 business days after the receipt of any comment that is not in an electronic format, the lead agency shall convert that comment into a readily accessible electronic format and make it available to the public in that format.
(7)Notwithstanding paragraphs (2) to (6), inclusive, documents submitted to or relied on by the lead agency that were not prepared specifically for the project and are copyright protected are not required to be made readily accessible in an electronic format. For those copyright-protected documents, the lead agency shall make an index of these documents available in an electronic format no later than the date of the release of the draft environmental impact report, or within five business days if the document is received or relied on by the lead agency after the release of the draft environmental impact report. The index shall specify the libraries or lead agency offices in which hardcopies of the copyrighted materials are available for public review.
(8)The lead agency shall certify the final record of proceedings within five days after the filing of the notice required by subdivision (a) of Section 21152.
(9)Any dispute arising from the record of proceedings shall be resolved by the superior court. Unless the superior court directs otherwise, a party disputing the content of the record shall file a motion to augment the record at the time it files its initial brief.
(10)The contents of the record of proceedings shall be as set forth in subdivision (e) of Section 21167.6.
(h)The provisions of this section are severable. If any provision of this section or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
(i)(1)If the lead agency fails to certify an environmental impact report for the project before January 1, 2025, this section shall become inoperative and is repealed as of that date.
(2)The lead agency shall notify the Secretary of State if it fails to certified the environmental impact report for the project before January 1, 2025.
(j)(1)As a condition of approval of the project, the lead agency shall require the applicant, with respect to any measures specific to the operation of the arena, to implement measures that will meet the requirements of this division by the end of the first NBA regular season or June of the first NBA regular season, whichever is later, during which an NBA team has played at the arena.
(2)To maximize public health, environmental, and employment benefits, the lead agency shall require measures that will reduce the emissions of greenhouse gases in the project area and in the neighboring communities of the arena.
(3)Not less than 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of paragraph (3) of subdivision (b) shall be from local, direct greenhouse gas emissions reduction measures, including, but not limited to, any of the following:
(A)Project design features or onsite reduction measures, or both design features and onsite reduction measures, that include, but are not limited to, any of the following:
(i)Implementing project design features that enable the arena to exceed the building energy efficiency standards set forth in Part 6 of Title 24 of the California Code of Regulations, except for 50 percent of emissions reductions attributable to design features necessary to meet the LEED gold certification requirement.
(ii)Requiring a transportation demand management program to reduce single-occupancy vehicular travel and vehicle miles traveled.
(iii)Providing onsite renewable energy generation, including a solar roof on the arena with a minimum peak generation capacity of 500 kilowatts.
(iv)Providing solar-ready roofs.
(v)Providing cool roofs and cool parking promoting cool surface treatment for new parking facilities.
(B)Off-site reduction measures in the neighboring communities, including, but not limited to, any of the following:
(i)Temporarily expanding the capacity of a public transit line, as appropriate, to serve arena events.
(ii)Paying its fair share of the cost of measures that expand the capacity of public transit, if appropriate, that is used by spectators attending arena events.
(iii)Providing funding to an off-site mitigation project consisting of replacing buses, trolleys, or other transit vehicles with zero-emission vehicles.
(iv)Providing off-site safety or other improvements for bicycles, pedestrians, and transit connections.
(v)Providing zero-emission transit buses to serve arena events and to meet other local transit needs, including senior and public school transportation services.
(vi)Undertaking or funding building retrofits to improve the energy efficiency of existing buildings.
(4)The applicant may obtain offset credits for up to 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirements of paragraph (3) of subdivision (b). The applicant shall, to the extent feasible, place the highest priority on the purchase of offset credits that produce emission reductions within the City of Inglewood or the boundaries of the South Coast Air Quality Management District. Any offset credits shall be verified by a third party accredited by the State Air Resources Board. Offset credits generated by a project located outside the United States shall not be used pursuant to this paragraph.
(k)As a condition of approval of the project, the lead agency shall require the applicant, in consultation with the South Coast Air Quality Management District, to implement measures that will achieve criteria pollutant and toxic air contaminant reductions over and above any emission reductions required by other laws or regulations in communities surrounding the project consistent with emission reduction measures that may be identified for those communities pursuant to Section 44391.2 of the Health and Safety Code.
(1)At a minimum, these measures shall achieve reductions of a minimum of 400 tons of oxides of nitrogen and 10 tons of PM2.5, as defined in Section 39047.2 of the Health and Safety Code, over 10 years following the commencement of construction of the project. Of these amounts, reductions of a minimum of 130 tons of oxides of nitrogen and 3 tons of PM2.5 shall be achieved within the first year following commencement of construction of the project. The reductions required pursuant to this paragraph are in addition to any other requirements imposed by other laws.
(2)If the project applicant can demonstrate and verify to the South Coast Air Quality Management District that it has invested at least thirty million dollars ($30,000,000) to achieve the requirements of this subdivision, the requirements of this subdivision shall be deemed met, so long as one-half of the reductions set forth in paragraph (1) are met.
(3)Greenhouse gas emissions reductions achieved pursuant to this subdivision shall count toward the applicants obligations under paragraph (3) of subdivision (j).
(l)This section does not apply to a project that proposes the construction of a new gambling establishment, as defined in Section 19805 of the Business and Professions Code or Section 337 of the Penal Code.
SEC. 2.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances of the construction of a major new sports venue in the City of Inglewood, a city with the largest minority population in the United States, which will provide essential economic stimulus.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)For the purposes of this section, the following definitions apply:
(1)Applicant means a private or public entity or its affiliates that proposes to implement and operate all or any portion of the project and its successors, heirs, and assignees.
(2)Arena means an 18,000 to 20,000 seat arena built as part of the project for National Basketball Association (NBA) basketball games and other spectator events.
(3)Project means a project located within the project area consisting of the arena plus practice and athletic training facility, and related parking and access access, infrastructure construction or relocation, and landscaping, up to approximately 75,000 square feet of associated office space, up to approximately 30,000 square feet of sports medicine clinic space, up to approximately 55,000 70,000 square feet of ancillary retail, restaurant, community space, and similar uses, and a hotel, provided that the arena project meets all of the following:
(A)Receives Leadership in Energy and Environmental Design (LEED) gold certification for new construction within one year of the completion of the first NBA season.
(B)(i)Requires a transportation management plan or transportation demand management program, or both, that achieves, by January 1, 2030, program that, upon full implementation, will achieve and maintain a 15-percent reduction in the number of vehicle trips collectively trips, collectively, by attendees, employees, visitors, and customers as compared to operations absent the transportation management plan or transportation demand management program, or both. program.
(ii)Provides shuttles, charter buses, or similar services from a major transit stop to serve arena events.(ii)To accelerate and maximize vehicle trip reduction, each measure in the transportation demand management program shall be implemented as soon as feasible, so that no less than a 7.5-percent reduction in vehicle trips is achieved and maintained by the end of the first NBA season during which an NBA team has played at the arena.
(iii)A 15-percent reduction in vehicle trips shall be achieved and maintained as soon as feasible, but not later than January 1, 2030. The applicant shall verify achievement to the lead agency and the Office of Planning and Research.
(iv)If the applicant fails to verify achievement of the reduction required by clause (iii), the lead agency shall impose additional feasible measures to reduce vehicle trips by 17 percent, or, if there is a rail transit line with a stop within one-quarter mile of the arena, 20 percent, by January 1, 2035.
(C)Is located on an infill site.
(D)Is consistent with the general use designation, density, building intensity, and applicable policies specified for the project area in either a sustainable communities strategy or an alternative planning strategy for which the State Air Resources Board, pursuant to subparagraph (H) of paragraph (2) of subdivision (b) of Section 65080 of the Government Code, has accepted a metropolitan planning organizations determination that the sustainable communities strategy or the alternative planning strategy would, if implemented, achieve the greenhouse gas emission reduction targets.
(4)Project approval means any action, activity, ordinance, resolution, agreement, approval, determination, finding, or decision taken, adopted, or approved by the lead agency required to allow the applicant to commence the construction of the project, as determined by the lead agency.
(5)Project area means real property in the City of Inglewood consisting of approximately 35 acres, including without limitation areas generally described as follows:
(A)Assessor identification numbers 4032-001-005, 4032-001-006, 4032-001-033, 4032-001-035, 4032-001-039, 4032-001-048, 4032-001-049, 4032-001-900 to 4032-001-913, inclusive, 4032-002-913 to 4032-002-917, inclusive, 4032-003-912, 4032-003-914, 4032-003-915, 4032-004-913, 4032-004-914, 4032-007-035, 4032-007-900 to 4032-007-905, inclusive, 4032-008-001, 4032-008-002, 4032-008-006, 4032-008-034, 4032-008-035, 4032-008-900 to 4032-008-905, inclusive, 4032-008-907, 4032-008-908, 4034-004-026, 4034-004-900 to 4034-004-913, inclusive, and 4034-005-900 to 4034-005-912, inclusive.
(B)West 101st Street from its intersection with South Prairie Avenue westerly to a line approximately 488 feet west of the western boundary of South Prairie Avenue, and West 102nd Street from its intersection with South Prairie Avenue easterly to a line approximately 883 feet east of the eastern boundary of South Prairie Avenue.
(C)Adjacent areas or air space to be used for access.
(6)Transportation demand management program means a specific program of strategies, incentives, and tools to be implemented, with specific annual status reporting obligations in accordance with paragraph (5) of subdivision (b), to reduce vehicle trips by providing opportunities for event attendees and employees to choose sustainable travel options such as transit, bicycle riding, or walking. A specific program of strategies, incentives, and tools includes, but is not limited to, the following:
(A)Provision of shuttles, charter buses, or similar services from a major transit stop to serve arena events.
(B)Provision of onsite electric vehicle charging stations in excess of applicable requirements.
(C)Provision of dedicated parking for car-share or zero-emission vehicles, or both types of vehicle, in excess of applicable requirements.
(D)Provision of bicycle parking in excess of applicable requirements.
(E)Inclusion of a transit facility with area dedicated to shuttle bus staging, ride share, bicycle parking, and other modalities intended to reduce the use of single occupant vehicles.
(b)The Governor may certify the project for streamlining pursuant to this section if all the following conditions are met:
(1)The project will result in a minimum investment of one hundred million dollars ($100,000,000) in California upon completion of construction.
(2)(A)(i)The project creates high-wage, highly skilled jobs that pay prevailing wages and living wages, employs a skilled and trained workforce, as defined in subdivision (d) of Section 2601 of the Public Contract Code, provides construction jobs and permanent jobs for Californians, and helps reduce unemployment. For purposes of this subdivision, jobs that pay prevailing wages means that all construction workers employed in the execution of the project will receive at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code. If the project is certified for streamlining, the project applicant shall include this requirement in all contracts for the performance of the work.
(ii)Clause (i) does not apply to a contractor or subcontractor performing the work on the project that is subject to a project labor agreement requiring the payment of prevailing wages to all construction workers employed in the execution of the project and providing for enforcement of that obligation through an arbitration procedure. For purposes of this clause, project labor agreement has the same meaning as set forth in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(B)(i)If the project is certified pursuant to this subdivision, contractors and subcontractors shall pay to all construction workers employed in the execution of the project at least the general prevailing rate of per diem wages.
(ii)Except as provided in clause (iii), the obligation of the contractors and subcontractors to pay prevailing wages pursuant to subparagraph (A) may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of the project, or by an underpaid worker through an administrative complaint or civil action. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond or bonds issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.
(iii)Clause (ii) does not apply if all contractors and subcontractors performing work on the project are subject to a project labor agreement that requires the payment of prevailing wages to all construction workers employed in the execution of the project and provides for enforcement of that obligation through an arbitration procedure. For purposes of this subparagraph, project labor agreement has the same meaning as set forth in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(3)The project does not result in any net additional emission of greenhouse gases, including greenhouse gas emissions from employee transportation, as determined by the State Air Resources Board pursuant to Division 25.5 (commencing with Section 38500) of the Health and Safety Code. The State Air Resources Board is encouraged to make its determination no later than 120 calendar days after receiving an application for review of the methodology and calculations of the projects greenhouse gas emissions.
(4)The project applicant demonstrates compliance with the requirements of Chapters 12.8 (commencing with Section 42649) and 12.9 (commencing with Section 42649.8) of Part 3 of Division 30, as applicable.
(5)The project applicant has entered into a binding and enforceable agreement that all mitigation measures required pursuant to this division and any other environmental measures required by this section to certify the project under this chapter section shall be conditions of approval of the project, and those conditions will be fully enforceable by the lead agency or another agency designated by the lead agency. In the case of environmental mitigation measures, measures and any other environmental measures required by this section, the applicant agrees, as an ongoing obligation, that those measures will be monitored and enforced by the lead agency for the life of the obligation. The project applicant shall submit to the lead agency an annual status report on the implementation of the environmental mitigation measures and any other environmental measures required by this section.
(6)The project applicant agrees to pay any additional costs incurred by the courts in hearing and deciding any case subject to this section, including payment of the costs for the appointment of a special master if deemed appropriate by the court, in a form and manner specified by the Judicial Council, as provided in the Rules of Court adopted by the Judicial Council.
(7)The project applicant agrees to pay the costs of preparing the record of proceedings for the project concurrent with review and consideration of the project pursuant to this division, in a form and manner specified by the lead agency for the project.
(c)(1)The Governor may certify the project for streamlining pursuant to this section if it complies with the conditions specified in subdivision (b).
(2)(A)Prior to certifying the project, the Governor shall make a determination that each of the conditions specified in subdivision (b) has been met. These findings are not subject to judicial review.
(B)(i)If the Governor determines that the project is eligible for streamlining pursuant to this section, he or she shall submit that determination, and any supporting information, to the Joint Legislative Budget Committee for review and concurrence or nonconcurrence.
(ii)Within 30 days of receiving the determination, the Joint Legislative Budget Committee shall concur or nonconcur in writing on the determination.
(iii)If the Joint Legislative Budget Committee fails to concur or nonconcur on a determination by the Governor within 30 days of the submittal, the project is deemed to be certified.
(3)Applicable The guidelines issued pursuant to Chapter 6.5 (commencing with Section 21178) apply for the implementation of this section. section to the extent the guidelines are applicable and do not conflict with specific requirements of this section, including the transportation demand management program specified in subparagraph (B) of paragraph (3) of subdivision (a).
(d)(1)Within 10 days of the Governor certifying the project pursuant to this section, the lead agency shall, at the applicants expense, issue a public notice in no less than 12-point type stating the following:
THE APPLICANT HAS ELECTED TO PROCEED UNDER SECTION 21168.6.8 OF THE PUBLIC RESOURCES CODE, WHICH PROVIDES, AMONG OTHER THINGS, THAT ANY JUDICIAL ACTION CHALLENGING THE CERTIFICATION OF THE EIR OR THE APPROVAL OF THE PROJECT DESCRIBED IN THE EIR IS SUBJECT TO THE PROCEDURES SET FORTH IN SECTION 21186.6.8 OF THE PUBLIC RESOURCES CODE. A COPY OF SECTION 21168.6.8 OF THE PUBLIC RESOURCES CODE IS INCLUDED BELOW
(2)The public notice shall be distributed by the lead agency as required for public notices issued pursuant to paragraph (3) of subdivision (b) of Section 21092.
(e)Notwithstanding any other law, the procedures set forth in subdivision (e) (f) shall apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of any environmental impact report for the project that is certified pursuant to this section or the granting of any project approvals.
(f)Rules 3.2220 to 3.2237, inclusive, of the California Rules of Court, as may be amended by the Judicial Council, shall apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of any environmental impact report for the project or granting of any project approvals to require the actions or proceeding, including any potential appeals therefrom, to be resolved, to the extent feasible, within 270 days of the filing of the certified record of proceedings with the court. On or before July 1, 2019, the Judicial Council shall amend the California Rules of Court, as necessary, to implement this subdivision.
(g)Notwithstanding any other law, the preparation and certification of the record of proceedings for the certified project shall be performed in the following manner:
(1)The lead agency for the project shall prepare the record of proceedings pursuant to this division concurrently with the administrative process.
(2)All documents and other materials placed in the record of proceedings shall be posted on, and be downloadable from, an Internet Web site maintained by the lead agency commencing with the date of the release of the draft environmental impact report.
(3)The lead agency shall make available to the public in a readily accessible electronic format the draft environmental impact report and all other documents submitted to, or relied on by, the lead agency in the preparation of the draft environmental impact report.
(4)A document prepared by the lead agency or submitted by the applicant after the date of the release of the draft environmental impact report that is a part of the record of the proceedings shall be made available to the public in a readily accessible electronic format within five business days after the document is released or received by the lead agency.
(5)The lead agency shall encourage written comments on the project to be submitted in a readily accessible electronic format, and shall make any comment available to the public in a readily accessible electronic format within five days of its receipt.
(6)Within 14 business days after the receipt of any comment that is not in an electronic format, the lead agency shall convert that comment into a readily accessible electronic format and make it available to the public in that format.
(7)Notwithstanding paragraphs (2) to (6), inclusive, documents submitted to or relied on by the lead agency that were not prepared specifically for the project and are copyright protected are not required to be made readily accessible in an electronic format. For those copyright-protected documents, the lead agency shall make an index of these documents available in an electronic format no later than the date of the release of the draft environmental impact report, or within five business days if the document is received or relied on by the lead agency after the release of the draft environmental impact report. The index shall specify the libraries or lead agency offices in which hardcopies of the copyrighted materials are available for public review.
(8)The lead agency shall certify the final record of proceedings within five days after the filing of the notice required by subdivision (a) of Section 21152.
(9)Any dispute arising from the record of proceedings shall be resolved by the superior court. Unless the superior court directs otherwise, a party disputing the content of the record shall file a motion to augment the record at the time it files its initial brief.
(10)The contents of the record of proceedings shall be as set forth in subdivision (e) of Section 21167.6.
(h)The provisions of this section are severable. If any provision of this section or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
(i)(1)If the lead agency fails to certify an environmental impact report for the project before January 1, 2025, this section shall become inoperative and is repealed as of that date.
(2)The lead agency shall notify the Secretary of State if it fails to certified the environmental impact report for the project before January 1, 2025.
(j)(1)As a condition of approval of the project, the lead agency shall require the applicant, with respect to any measures specific to the operation of the arena, to implement measures that will meet the requirements of this division by the end of the first NBA regular season or June of the first NBA regular season, whichever is later, during which an NBA team has played at the arena.
(2)To maximize public health, environmental, and employment benefits, the lead agency shall require feasible measures that will reduce the emissions of greenhouse gases in the project area and in the neighboring communities of the arena. Mitigation measures to be considered and implemented, if feasible and necessary, to
(3)Not less than 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of paragraph (3) of subdivision (b) include, but are shall be from local, direct greenhouse gas emissions reduction measures, including, but not limited to, any of the following:
(A)Project design features or onsite reduction measures, or both design features and onsite reduction measures, that include, but are not limited to, any of the following:
(i)Implementing project design features that enable the arena to exceed the building energy efficiency standards set forth in Part 6 of Title 24 of the California Code of Regulations. Regulations, except for 50 percent of emissions reductions attributable to design features necessary to meet the LEED gold certification requirement.
(ii)Requiring a transportation management plan or transportation demand management program, or both, program to reduce single-occupancy vehicular travel and vehicle miles traveled.
(iii)Using energy produced by renewable resources.(iv)Providing onsite electric vehicle charging stations in excess of applicable requirements.(v)Providing dedicated parking for car-share or zero-emission vehicles, or for both types of vehicles in excess of applicable requirements.(vi)Providing bicycle parking in excess of applicable requirements.(vii)Providing onsite safety or other improvements for bicycles, pedestrians, and transit connections.(viii)(iii)Providing onsite renewable energy generation. generation, including a solar roof on the arena with a minimum peak generation capacity of 500 kilowatts.
(ix)(iv)Providing solar-ready roofs.
(x)(v)Providing cool roofs and cool parking promoting cool surface treatment for new parking facilities.
(B)Off-site reduction measures, including measures in the neighboring communities, including, but not limited to, any of the following:
(i)Temporarily expanding the capacity of a public transit line, as appropriate, to serve arena events.
(ii)Paying its fair share of the cost of measures that expand the capacity of public transit, if appropriate, that is used by spectators attending arena events.
(iii)Providing funding to an off-site mitigation project to generate carbon credits that potentially could consist consisting of replacing buses, trolleys, or other transit vehicles with low-emission or zero-emission vehicles.
(iv)Providing off-site safety or other improvements for bicycles, pedestrians, and transit connections.
(v)Providing zero-emission transit buses to serve arena events and to meet other local transit needs, including senior and public school transportation services.
(vi)Undertaking or funding building retrofits to improve the energy efficiency of existing buildings.
(C)(4)The applicant may obtain offset credits for up to 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirements of paragraph (3) of subdivision (b). The applicant shall, to the extent feasible, place the highest priority on the purchase of offset credits that produce emission reductions within the City of Inglewood or the boundaries of the South Coast Air Quality Management District. Any offset credits shall be verified by a third party accredited by the State Air Resources Board. Offset credits generated by a project located outside the United States shall not be used pursuant to this paragraph.
(k)As a condition of approval of the project, the lead agency shall require the applicant, in consultation with the South Coast Air Quality Management District, to implement measures that will achieve criteria pollutant and toxic air contaminant reductions over and above any emission reductions required by other laws or regulations in communities surrounding the project consistent with emission reduction measures that may be identified for those communities pursuant to Section 44391.2 of the Health and Safety Code.
(1)At a minimum, these measures shall achieve reductions of a minimum of 400 tons of oxides of nitrogen and 10 tons of PM2.5, as defined in Section 39047.2 of the Health and Safety Code, over 10 years following the commencement of construction of the project. Of these amounts, reductions of a minimum of 130 tons of oxides of nitrogen and 3 tons of PM2.5 shall be achieved within the first year following commencement of construction of the project. The reductions required pursuant to this paragraph are in addition to any other requirements imposed by other laws.
(2)If the project applicant can demonstrate and verify to the South Coast Air Quality Management District that it has invested at least thirty million dollars ($30,000,000) to achieve the requirements of this subdivision, the requirements of this subdivision shall be deemed met, so long as one-half of the reductions set forth in paragraph (1) are met.
(3)Greenhouse gas emissions reductions achieved pursuant to this subdivision shall count toward the applicants obligations under paragraph (3) of subdivision (j).
(k)(l)This section does not apply to a project that proposes the construction of a new gaming gambling establishment, as defined in Section 19805 of the Business and Professions Code or Section 337 of the Penal Code.
SEC. 2.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances of the construction of a major new sports venue in the City of Inglewood, a city with the largest minority population in the United States, which will provide essential economic stimulus.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)For the purposes of this section, the following definitions apply:
(1)Applicant means a private or public entity or its affiliates that proposes to implement and operate all or any portion of the project and its successors, heirs, and assignees.
(2)Arena means an 18,000 to 20,000 seat arena built pursuant to as part of the project for National Basketball Association (NBA) basketball games and other spectator events.
(3)Project means a project located within the project area consisting of the arena plus practice and athletic training facility, and related parking and access infrastructure construction or relocation, and landscaping, up to approximately 75,000 square feet of associated office space, up to approximately 30,000 square feet of sports medicine clinic space, up to approximately 55,000 square feet of ancillary retail, restaurant, community space, and similar uses, and a hotel, provided that the arena meets all of the following:
(A)Receives Leadership in Energy and Environmental Design (LEED) gold certification, or its equivalent, certification for new construction within one year of the completion of the first NBA season.
(B)(i)Requires a transportation management plan or transportation demand management program, or both, that achieves, by January 1, 2030, a 15-percent reduction in the number of per capita vehicle trips collectively by attendees, employees, visitors, or and customers as compared to operations absent the transportation management plan or transportation demand management program, or both.
(ii)Provides shuttles, charter buses, or similar services from a major transit stop to serve arena events.
(C)Is located on an infill site.
(D)Is consistent with the general use designation, density, building intensity, and applicable policies specified for the project area in either a sustainable communities strategy or an alternative planning strategy for which the State Air Resources Board, pursuant to subparagraph (H) of paragraph (2) of subdivision (b) of Section 65080 of the Government Code, has accepted a metropolitan planning organizations determination that the sustainable communities strategy or the alternative planning strategy would, if implemented, achieve the greenhouse gas emission reduction targets.
(4)Project approval means any action, activity, ordinance, resolution, agreement, approval, determination, finding, or decision taken, adopted, or approved by the lead agency required to allow the applicant to commence the construction of the project, as determined by the lead agency.
(4)(5)Project area means real property in the City of Inglewood consisting of approximately 35 acres, including without limitation areas generally described as follows:
(A)Assessor identification numbers 4032-001-005, 4032-001-006, 4032-001-033, 4032-001-035, 4032-001-039, 4032-001-048, 4032-001-049, 4032-001-900 to 4032-001-913, inclusive, 4032-002-913 to 4032-002-917, inclusive, 4032-003-912, 4032-003-914, 4032-003-915, 4032-004-913, 4032-004-914, 4032-007-035, 4032-007-900 to 4032-007-905, inclusive, 4032-008-001, 4032-008-002, 4032-008-006, 4032-008-034, 4032-008-035, 4032-008-900 to 4032-008-905, inclusive, 4032-008-907, 4032-008-908, 4034-004-026, 4034-004-900 to 4034-004-913, inclusive, and 4034-005-900 to 4034-005-912, inclusive.
(B)West 101st Street from its intersection with South Prairie Avenue westerly to a line approximately 488 feet west of the western boundary of South Prairie Avenue, and West 102nd Street from its intersection with South Prairie Avenue easterly to a line approximately 883 feet east of the eastern boundary of South Prairie Avenue.
(C)Adjacent areas or air space to be used for access.
(b)The Governor may certify the project for streamlining pursuant to this section if all the following conditions are met:
(1)The project will result in a minimum investment of one hundred million dollars ($100,000,000) in California upon completion of construction.
(2)(A)(i)The project creates high-wage, highly skilled jobs that pay prevailing wages and living wages and provide wages, employs a skilled and trained workforce, as defined in subdivision (d) of Section 2601 of the Public Contract Code, provides construction jobs and permanent jobs for Californians, and helps reduce unemployment. For purposes of this subdivision, jobs that pay prevailing wages means that all construction workers employed in the execution of the project will receive at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code. If the project is certified for streamlining, the project applicant shall include this requirement in all contracts for the performance of the work.
(ii)Clause (i) does not apply to a contractor or subcontractor performing the work on the project that is subject to a project labor agreement requiring the payment of prevailing wages to all construction workers employed in the execution of the project and providing for enforcement of that obligation through an arbitration procedure. For purposes of this clause, project labor agreement has the same meaning as set forth in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(B)(i)If the project is certified pursuant to this subdivision, contractors and subcontractors shall pay to all construction workers employed in the execution of the project at least the general prevailing rate of per diem wages.
(ii)Except as provided in clause (iii), the obligation of the contractors and subcontractors to pay prevailing wages pursuant to subparagraph (A) may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of the project, or by an underpaid worker through an administrative complaint or civil action. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond or bonds issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.
(iii)Clause (ii) does not apply if all contractors and subcontractors performing work on the project are subject to a project labor agreement that requires the payment of prevailing wages to all construction workers employed in the execution of the project and provides for enforcement of that obligation through an arbitration procedure. For purposes of this subparagraph, project labor agreement has the same meaning as set forth in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(3)The project does not result in any net additional emission of greenhouse gases, including greenhouse gas emissions from employee transportation, as determined by the State Air Resources Board pursuant to Division 25.5 (commencing with Section 38500) of the Health and Safety Code.
(4)The project applicant demonstrates compliance with the requirements of Chapters 12.8 (commencing with Section 42649) and 12.9 (commencing with Section 42649.8) of Part 3 of Division 30, as applicable.
(5)The project applicant has entered into a binding and enforceable agreement that all mitigation measures required pursuant to this division to certify the project under this chapter shall be conditions of approval of the project, and those conditions will be fully enforceable by the lead agency or another agency designated by the lead agency. In the case of environmental mitigation measures, the applicant agrees, as an ongoing obligation, that those measures will be monitored and enforced by the lead agency for the life of the obligation.
(6)The project applicant agrees to pay any additional costs incurred by the courts in hearing and deciding any case subject to this section, including payment of the costs for the appointment of a special master if deemed appropriate by the court, in a form and manner specified by the Judicial Council, as provided in the Rules of Court adopted by the Judicial Council.
(7)The project applicant agrees to pay the costs of preparing the record of proceedings for the project concurrent with review and consideration of the project pursuant to this division, in a form and manner specified by the lead agency for the project.
(c)(1)The Governor may certify the project for streamlining pursuant to this section if it complies with the conditions specified in subdivision (b).
(2)(A)Prior to certifying the project, the Governor shall make a determination that each of the conditions specified in subdivision (b) has been met. These findings are not subject to judicial review.
(B)(i)If the Governor determines that the project is eligible for streamlining pursuant to this section, he or she shall submit that determination, and any supporting information, to the Joint Legislative Budget Committee for review and concurrence or nonconcurrence.
(ii)Within 30 days of receiving the determination, the Joint Legislative Budget Committee shall concur or nonconcur in writing on the determination.
(iii)If the Joint Legislative Budget Committee fails to concur or nonconcur on a determination by the Governor within 30 days of the submittal, the project is deemed to be certified.
(3)Applicable guidelines issued pursuant to Chapter 6.5 (commencing with Section 21178) apply for the implementation of this section.
(d)(1)Within 10 days of the Governor certifying the project pursuant to this section, the lead agency shall, at the applicants expense, issue a public notice in no less than 12-point type stating the following:
THE APPLICANT HAS ELECTED TO PROCEED UNDER SECTION 21168.6.8 OF THE PUBLIC RESOURCES CODE, WHICH PROVIDES, AMONG OTHER THINGS, THAT ANY JUDICIAL ACTION CHALLENGING THE CERTIFICATION OF THE EIR OR THE APPROVAL OF THE PROJECT DESCRIBED IN THE EIR IS SUBJECT TO THE PROCEDURES SET FORTH IN SECTION 21186.6.8 OF THE PUBLIC RESOURCES CODE. A COPY OF SECTION 21168.6.8 OF THE PUBLIC RESOURCES CODE IS INCLUDED BELOW
(2)The public notice shall be distributed by the lead agency as required for public notices issued pursuant to paragraph (3) of subdivision (b) of Section 21092.
(d)(e)Notwithstanding any other law, the procedures set forth in subdivision (e) shall apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of any environmental impact report for the project that is certified pursuant to this section or the granting of any project approvals.
(e)(f)Rules 3.2220 to 3.2237, inclusive, of the California Rules of Court, as may be amended by the Judicial Council, shall apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of any environmental impact report for the project or granting of any project approvals to require the actions or proceeding, including any potential appeals therefrom, to be resolved, to the extent feasible, within 270 days of the filing of the certified record of proceedings with the court. On or before July 1, 2019, the Judicial Council shall amend the California Rules of Court, as necessary, to implement this subdivision.
(f)(g)Notwithstanding any other law, the preparation and certification of the record of proceedings for the certified project shall be performed in the following manner:
(1)The lead agency for the project shall prepare the record of proceedings pursuant to this division concurrently with the administrative process.
(2)All documents and other materials placed in the record of proceedings shall be posted on, and be downloadable from, an Internet Web site maintained by the lead agency commencing with the date of the release of the draft environmental impact report.
(3)The lead agency shall make available to the public in a readily accessible electronic format the draft environmental impact report and all other documents submitted to, or relied on by, the lead agency in the preparation of the draft environmental impact report.
(4)A document prepared by the lead agency or submitted by the applicant after the date of the release of the draft environmental impact report that is a part of the record of the proceedings shall be made available to the public in a readily accessible electronic format within five business days after the document is released or received by the lead agency.
(5)The lead agency shall encourage written comments on the project to be submitted in a readily accessible electronic format, and shall make any comment available to the public in a readily accessible electronic format within five days of its receipt.
(6)Within seven 14 business days after the receipt of any comment that is not in an electronic format, the lead agency shall convert that comment into a readily accessible electronic format and make it available to the public in that format.
(7)Notwithstanding paragraphs (2) to (6), inclusive, documents submitted to or relied on by the lead agency that were not prepared specifically for the project and are copyright protected are not required to be made readily accessible in an electronic format. For those copyright-protected documents, the lead agency shall make an index of these documents available in an electronic format no later than the date of the release of the draft environmental impact report, or within five business days if the document is received or relied on by the lead agency after the release of the draft environmental impact report. The index shall specify the libraries or lead agency offices in which hardcopies of the copyrighted materials are available for public review.
(8)The lead agency shall certify the final record of proceedings within five days of its approval of the project. after the filing of the notice required by subdivision (a) of Section 21152.
(9)Any dispute arising from the record of proceedings shall be resolved by the superior court. Unless the superior court directs otherwise, a party disputing the content of the record shall file a motion to augment the record at the time it files its initial brief.
(10)The contents of the record of proceedings shall be as set forth in subdivision (e) of Section 21167.6.
(g)(h)The provisions of this section are severable. If any provision of this section or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
(h)(i)(1)If the lead agency fails to certify an environmental impact report for the project before January 1, 2025, this section shall become inoperative and is repealed as of that date.
(2)The lead agency shall notify the Secretary of State if it fails to certified the environmental impact report for the project before January 1, 2025.
(j)(1)As a condition of approval of the project, the lead agency shall require the applicant, with respect to any measures specific to the operation of the arena, to implement measures that will meet the requirements of this division by the end of the first NBA regular season or June of the first NBA regular season, whichever is later, during which an NBA team has played at the arena.
(2)To maximize public health, environmental, and employment benefits, the lead agency shall require feasible measures that will reduce the emissions of greenhouse gases in the project area and in the neighboring communities of the arena. Mitigation measures to be considered and implemented, if feasible and necessary, to achieve the requirement of paragraph (3) of subdivision (b) include, but are not limited to, any of the following:
(A)Project design features or onsite reduction measures, or both design features and onsite reduction measures, that include, but are not limited to, any of the following:
(i)Implementing project design features that enable the arena to exceed the building energy efficiency standards set forth in Part 6 of Title 24 of the California Code of Regulations.
(ii)Requiring a transportation management plan or transportation demand management program, or both, to reduce single-occupancy vehicular travel and vehicle miles traveled.
(iii)Using energy produced by renewable resources.
(iv)Providing onsite electric vehicle charging stations in excess of applicable requirements.
(v)Providing dedicated parking for car-share or zero-emission vehicles, or for both types of vehicles in excess of applicable requirements.
(vi)Providing bicycle parking in excess of applicable requirements.
(vii)Providing onsite safety or other improvements for bicycles, pedestrians, and transit connections.
(viii)Providing onsite renewable energy generation.
(ix)Providing solar-ready roofs.
(x)Providing cool roofs and cool parking promoting cool surface treatment for new parking facilities.
(B)Off-site reduction measures, including any of the following:
(i)Temporarily expanding the capacity of a public transit line, as appropriate, to serve arena events.
(ii)Paying its fair share of the cost of measures that expand the capacity of public transit, if appropriate, that is used by spectators attending arena events.
(iii)Providing funding to an off-site mitigation project to generate carbon credits that potentially could consist of replacing buses, trolleys, or other transit vehicles with low-emission or zero-emission vehicles.
(iv)Providing off-site safety or other improvements for bicycles, pedestrians, and transit connections.
(C)The applicant shall, to the extent feasible, place the highest priority on the purchase of offset credits that produce emission reductions within the City of Inglewood or the boundaries of the South Coast Air Quality Management District.
(k)This section does not apply to a project that proposes the construction of a new gaming establishment, as defined in Section 19805 of the Business and Professions Code.
SEC. 2.This act does not affect litigation that is pending as of January 1, 2019.SEC. 3.SEC. 2.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances of the construction of a major new sports venue in the City of Inglewood, a city with the largest minority population in the United States, which will provide essential economic stimulus.
SEC. 4.SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)For the purposes of this section, the following definitions apply:
(1)Applicant means a private or public entity or its affiliates that proposes to implement and operate all or any portion of the project and its successors, heirs, and assignees.
(2)Arena means an 18,000 to 20,000 seat arena built pursuant to the project for National Basketball Association (NBA) basketball games and other spectator events.
(3)Project means a project located within the project area consisting of the arena plus practice and athletic training facility, and related parking infrastructure construction or relocation, and landscaping, up to approximately 75,000 square feet of associated office space, up to approximately 30,000 square feet of sports medicine clinic space, up to 55,000 square feet of ancillary retail, restaurant, community space, and similar uses, and a hotel, provided that the arena meets all of the following:
(A)Receives Leadership in Energy and Environmental Design (LEED) gold certification, or its equivalent, for new construction within one year of the completion of the first NBA season.
(B)(i)Requires a transportation management plan or transportation demand management program, or both, that achieves, by January 1, 2030, a 15-percent reduction in the number of per capita vehicle trips by attendees, employees, visitors, or customers as compared to operations absent the transportation management plan or transportation demand management program, or both.
(ii)Provides shuttles, charter buses, or similar services from a major transit stop to serve arena events.
(C)Is located on an infill site.
(D)Is consistent with the general use designation, density, building intensity, and applicable policies specified for the project area in either a sustainable communities strategy or an alternative planning strategy for which the State Air Resources Board, pursuant to subparagraph (H) of paragraph (2) of subdivision (b) of Section 65080 of the Government Code, has accepted a metropolitan planning organizations determination that the sustainable communities strategy or the alternative planning strategy would, if implemented, achieve the greenhouse gas emission reduction targets.
(4)Project area means real property in the City of Inglewood consisting of approximately 35 acres, including without limitation areas generally described as follows:
(A)Assessor identification numbers 4032-001-005, 4032-001-006, 4032-001-033, 4032-001-035, 4032-001-039, 4032-001-048, 4032-001-049, 4032-001-900 to 4032-001-913, inclusive, 4032-002-913 to 4032-002-917, inclusive, 4032-003-912, 4032-003-914, 4032-003-915, 4032-004-913, 4032-004-914, 4032-007-035, 4032-007-900 to 4032-007-905, inclusive, 4032-008-001, 4032-008-002, 4032-008-006, 4032-008-034, 4032-008-035, 4032-008-900 to 4032-008-905, inclusive, 4032-008-907, 4032-008-908, 4034-004-026, 4034-004-900 to 4034-004-913, inclusive, and 4034-005-900 to 4034-005-912, inclusive.
(B)West 101st Street from its intersection with South Prairie Avenue westerly to a line approximately 488 feet west of the western boundary of South Prairie Avenue, and West 102nd Street from its intersection with South Prairie Avenue easterly to a line approximately 883 feet east of the eastern boundary of South Prairie Avenue.
(b)The Governor may certify the project for streamlining pursuant to this section if all the following conditions are met:
(1)The project will result in a minimum investment of one hundred million dollars ($100,000,000) in California upon completion of construction.
(2)(A)The project creates high-wage, highly skilled jobs that pay prevailing wages and living wages and provide construction jobs and permanent jobs for Californians, and helps reduce unemployment. For purposes of this subdivision, jobs that pay prevailing wages means that all construction workers employed in the execution of the project will receive at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code. If the project is certified for streamlining, the project applicant shall include this requirement in all contracts for the performance of the work.
(B)(i)If the project is certified pursuant to this subdivision, contractors and subcontractors shall pay to all construction workers employed in the execution of the project at least the general prevailing rate of per diem wages.
(ii)Except as provided in clause (iii), the obligation of the contractors and subcontractors to pay prevailing wages pursuant to subparagraph (A) may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of the project, or by an underpaid worker through an administrative complaint or civil action. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond or bonds issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.
(iii)Clause (ii) does not apply if all contractors and subcontractors performing work on the project are subject to a project labor agreement that requires the payment of prevailing wages to all construction workers employed in the execution of the project and provides for enforcement of that obligation through an arbitration procedure. For purposes of this subparagraph, project labor agreement has the same meaning as set forth in paragraph (1) of subdivision (b) of Section 2500 of the Public Contract Code.
(3)The project does not result in any net additional emission of greenhouse gases, including greenhouse gas emissions from employee transportation, as determined by the State Air Resources Board pursuant to Division 25.5 (commencing with Section 38500) of the Health and Safety Code.
(4)The project applicant demonstrates compliance with the requirements of Chapters 12.8 (commencing with Section 42649) and 12.9 (commencing with Section 42649.8) of Part 3 of Division 30, as applicable.
(5)The project applicant has entered into a binding and enforceable agreement that all mitigation measures required pursuant to this division to certify the project under this chapter shall be conditions of approval of the project, and those conditions will be fully enforceable by the lead agency or another agency designated by the lead agency. In the case of environmental mitigation measures, the applicant agrees, as an ongoing obligation, that those measures will be monitored and enforced by the lead agency for the life of the obligation.
(6)The project applicant agrees to pay any additional costs incurred by the courts in hearing and deciding any case subject to this section, including payment of the costs for the appointment of a special master if deemed appropriate by the court, in a form and manner specified by the Judicial Council, as provided in the Rules of Court adopted by the Judicial Council.
(7)The project applicant agrees to pay the costs of preparing the record of proceedings for the project concurrent with review and consideration of the project pursuant to this division, in a form and manner specified by the lead agency for the project.
(c)(1)The Governor may certify the project for streamlining pursuant to this section if it complies with the conditions specified in subdivision (b).
(2)(A)Prior to certifying the project, the Governor shall make a determination that each of the conditions specified in subdivision (b) has been met. These findings are not subject to judicial review.
(B)(i)If the Governor determines that the project is eligible for streamlining pursuant to this section, he or she shall submit that determination, and any supporting information, to the Joint Legislative Budget Committee for review and concurrence or nonconcurrence.
(ii)Within 30 days of receiving the determination, the Joint Legislative Budget Committee shall concur or nonconcur in writing on the determination.
(iii)If the Joint Legislative Budget Committee fails to concur or nonconcur on a determination by the Governor within 30 days of the submittal, the project is deemed to be certified.
(3)Applicable guidelines issued pursuant to Chapter 6.5 (commencing with Section 21178) apply for the implementation of this section.
(d)(1)Within 10 days of the Governor certifying the project pursuant to this section, the lead agency shall, at the applicants expense, issue a public notice in no less than 12-point type stating the following:
THE APPLICANT HAS ELECTED TO PROCEED UNDER SECTION 21168.6.8 OF THE PUBLIC RESOURCES CODE, WHICH PROVIDES, AMONG OTHER THINGS, THAT ANY JUDICIAL
ACTION CHALLENGING THE CERTIFICATION OF THE EIR OR THE APPROVAL OF THE PROJECT DESCRIBED IN THE EIR IS SUBJECT TO THE PROCEDURES SET FORTH IN SECTION 21186.6.8 OF THE PUBLIC RESOURCES CODE. A COPY OF SECTION 21168.6.8 OF THE PUBLIC RESOURCES CODE IS INCLUDED BELOW
(2)The public notice shall be distributed by the lead agency as required for public notices issued pursuant to paragraph (3) of subdivision (b) of Section 21092.
(d)Notwithstanding any other law, the procedures set forth in subdivision (e) shall apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of any environmental impact report for the project that is certified pursuant to this section or the granting of any project approvals.
(e)Rules 3.2220 to 3.2237, inclusive, of the California Rules of Court, as may be amended by the Judicial Council, shall apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of any environmental impact report for the project or granting of any project approvals to require the actions or proceeding, including any potential appeals therefrom, to be resolved, to the extent feasible, within 270 days of the filing of the certified record of proceedings with the court. On or before July 1, 2019, the Judicial Council shall amend the California Rules of Court, as necessary, to implement this subdivision.
(f)Notwithstanding any other law, the preparation and certification of the record of proceedings for the certified project shall be performed in the following manner:
(1)The lead agency for the project shall prepare the record of proceedings pursuant to this division concurrently with the administrative process.
(2)All documents and other materials placed in the record of proceedings shall be posted on, and be downloadable from, an Internet Web site maintained by the lead agency commencing with the date of the release of the draft environmental impact report.
(3)The lead agency shall make available to the public in a readily accessible electronic format the draft environmental impact report and all other documents submitted to, or relied on by, the lead agency in the preparation of the draft environmental impact report.
(4)A document prepared by the lead agency or submitted by the applicant after the date of the release of the draft environmental impact report that is a part of the record of the proceedings shall be made available to the public in a readily accessible electronic format within five business days after the document is released or received by the lead agency.
(5)The lead agency shall encourage written comments on the project to be submitted in a readily accessible electronic format, and shall make any comment available to the public in a readily accessible electronic format within five days of its receipt.
(6)Within seven business days after the receipt of any comment that is not in an electronic format, the lead agency shall convert that comment into a readily accessible electronic format and make it available to the public in that format.
(7)Notwithstanding paragraphs (2) to (6), inclusive, documents submitted to or relied on by the lead agency that were not prepared specifically for the project and are copyright protected are not required to be made readily accessible in an electronic format. For those copyright-protected documents, the lead agency shall make an index of these documents available in an electronic format no later than the date of the release of the draft environmental impact report, or within five business days if the document is received or relied on by the lead agency after the release of the draft environmental impact report. The index shall specify the libraries or lead agency offices in which hardcopies of the copyrighted materials are available for public review.
(8)The lead agency shall certify the final record of proceedings within five days of its approval of the project.
(9)Any dispute arising from the record of proceedings shall be resolved by the superior court. Unless the superior court directs otherwise, a party disputing the content of the record shall file a motion to augment the record at the time it files its initial brief.
(10)The contents of the record of proceedings shall be as set forth in subdivision (e) of Section 21167.6.
(g)The provisions of this section are severable. If any provision of this section or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
(h)(1)If the lead agency fails to certify an environmental impact report for the project before January 1, 2025, this section shall become inoperative and is repealed as of that date.
(2)The lead agency shall notify the Secretary of State if it fails to certified the environmental impact report for the project before January 1, 2025.
SEC. 2.This act does not affect litigation that is pending as of January 1, 2019.
SEC. 3.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances of the construction of a major new sports venue in the City of Inglewood, a city with the largest minority population in the United States, which will provide essential economic stimulus.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
All matter omitted in this version of the bill appears in the bill as amended in the Senate, June 7, 2018. (JR11)(a)The Legislature finds and declares that with the adoption of Chapter 728 of the Statutes of 2008, popularly known as the Sustainable Communities and Climate Protection Act of 2008, the Legislature signaled its commitment to encouraging land use and transportation planning decisions and investments that reduce vehicle miles traveled and contribute to the reductions in greenhouse gas emissions required in the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code). Similarly, the California Complete Streets Act of 2008 (Chapter 657 of the Statutes of 2008) requires local governments to plan for a balanced, multimodal transportation network that meets the needs of all users of streets, roads, and highways for safe and convenient travel.
(b)It is the intent of the Legislature to do both of the following:
(1)Ensure that the environmental impacts of traffic, such as noise, air pollution, and safety concerns, continue to be properly addressed and mitigated through the California Environmental Quality Act.
(2)More appropriately balance the needs of congestion management with statewide goals related to infill development, the promotion of public health through active transportation, and the reduction of greenhouse gas emissions.
SEC. 2.The Legislature further finds and declares all of the following:
(a)The California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) requires that the environmental impacts of development projects be identified and mitigated. The act also guarantees the public an opportunity to review and comment on the environmental impacts of a project and to participate meaningfully in the development of mitigation measures for potentially significant environmental impacts.
(b)The City of Inglewood has embarked on a project that will incorporate sustainable design elements in a new mixed used development that integrates housing, civic, entertainment, and retail amenities to help reduce vehicle miles traveled resulting from discretionary automobile trips; promotes alternative means of transportation including provisions for nonvehicular travel; encourages higher-density development along established transit corridors; and contributes to air quality improvement through the creation of shade to reduce ambient heat produced by paved surfaces by integrating an urban forest concept into the overall landscape design.
(c)The sports and entertainment project will result in the construction of a new state-of-the-art multipurpose event center and surrounding infill development in the City of Inglewood, a development previously planned for commercial uses, as described in the City of Champions Revitalization Initiative approved by the City of Inglewood on February 24, 2015, and the agreement entered into by the City of Inglewood with Murphys Bowl LLC on June 15, 2017, as amended August 15, 2017.
(d)The project will generate over 30,000 full-time jobs including employees hired both during the construction and operation of the sports and entertainment project. This employment estimate does not include the substantial job generation that will occur with the surrounding development uses, which will generate additional hospitality, office, restaurant, and retail jobs in the City of Inglewoods downtown area.
(e)The project also presents an unprecedented opportunity to implement innovative measures that will significantly reduce traffic and air quality impacts and mitigate the greenhouse gas emissions resulting from the project. The project site is located in downtown Inglewood and situated to maximize opportunities to encourage nonautomobile modes of travel to the sports and entertainment center project, and is consistent with the policies and regional vision included in the Sustainable Communities and Climate Protection Act of 2008 pursuant to Chapter 728 of the Statutes of 2008.
(f)It is in the interest of the state to expedite judicial review of this sports and entertainment project, as appropriate, while protecting the environment and the rights of the public to review, comment on, and, if necessary, seek judicial review of, the adequacy of an environmental impact report for the project.
SEC. 3.Section 21168.6.8 is added to the Public Resources Code, to read:21168.6.8.(a)For the purposes of this section, the following definitions shall apply:
(1)Applicant means a private or public entity or its affiliates that proposes to implement and operate all or any portion of the project and its successors, heirs, and assignees.
(2)Arena means an 18,000 to 20,000 seat arena built pursuant to the project for National Basketball Association (NBA) basketball games and other spectator events.
(3)Project means a project located within the City of Inglewood consisting of either of the following:
(A)The arena plus practice and athletic training facility, and related parking infrastructure construction or relocation, and landscaping, up to approximately 75,000 square feet of associated office space, up to approximately 30,000 square feet of sports medicine clinic space, up to 55,000 square feet of ancillary retail, restaurant, community space, and similar uses, and a hotel, provided that the arena meets both of the following:
(i)Receives Leadership in Energy and Environmental Design (LEED) gold certification, or its equivalent, for new construction within one year of the completion of the first NBA season.
(ii)Achieves, through either project design, including those design features implemented for LEED gold certification, or the implementation of feasible mitigation measures, or both design features and mitigation measures, a reduction in the arenas operational emissions of greenhouse gases, as defined in subdivision (g) of Section 38505 of the Health and Safety Code, of no less than 20 percent as compared to the operational emissions that would otherwise result from an arena built in compliance with applicable building codes in the absence of the project design features or mitigation measures that are not required under the applicable building codes.
(B)Approvals related to any land uses that are consistent with the general plan, existing as of January 1, 2019, within the boundary of the Inglewood Sports and Entertainment project area.
(4)Project approval means any actions, activities, ordinances, resolutions, agreements, approvals, determinations, findings, or decisions taken, adopted, or approved by the lead agency required to allow the applicant to commence the construction of the project, as determined by the lead agency.
(5)Inglewood Sports and Entertainment project area means an approximately one square mile area located within the City of Inglewood consisting of both of the following areas:
(A)Real property consisting of approximately 298 acres that is located within the boundaries of the Hollywood Park Specific Plan, as of July 1, 2017.
(B)Real property consisting of approximately 59 acres, beginning at a point located 540 feet west of the intersection of the centerline of South Prairie Avenue and the northern boundary of West Century Boulevard, then southerly along a straight line to the southern boundary of West 102nd Street, then easterly along West 102nd Street to the western boundary of South Prairie Avenue, then southerly along the western boundary of South Prairie Avenue to the southern boundary of West 103rd Street, then easterly along a straight line to the eastern boundary of South Doty Avenue, then northerly along Doty Avenue to the southern boundary of West 102nd Street, then easterly along West 102nd Street to the eastern boundary of Yukon Avenue, then northerly along Yukon Avenue to the northern boundary of West Century Boulevard, then westerly along West Century Boulevard to the point located 540 feet west of the intersection of the centerline of South Prairie Avenue and the northern boundary of West Century Boulevard.
(b)Notwithstanding any other law, the procedures set forth in subdivision (c) shall apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of any environmental impact report for the project or the granting of any project approvals.
(c)Rules 3.2220 to 3.2237, inclusive, of the California Rules of Court, as may be amended by the Judicial Council, shall apply to any action or proceeding brought to attack, review, set aside, void, or annul the certification of any environmental impact report for the project or granting of any project approvals to require the actions or proceeding, including any potential appeals therefrom, to be resolved, to the extent feasible, within 270 days of the certification of the record of proceedings pursuant to subdivision (e). On or before July 1, 2019, the Judicial Council shall amend the California Rules of Court, as necessary, to implement this subdivision.
(d)(1)The draft and final environmental impact report shall include a notice in not less than 12-point type stating the following:
THIS EIR IS SUBJECT TO SECTION 21168.6.8 OF THE PUBLIC RESOURCES CODE, WHICH PROVIDES, AMONG OTHER THINGS, THAT THE LEAD AGENCY NEED NOT CONSIDER CERTAIN COMMENTS FILED AFTER THE CLOSE OF THE PUBLIC COMMENT PERIOD FOR THE DRAFT EIR. ANY JUDICIAL ACTION CHALLENGING THE CERTIFICATION OF THE EIR OR THE APPROVAL OF THE PROJECT DESCRIBED IN THE EIR IS SUBJECT TO THE PROCEDURES AND LIMITATIONS SET FORTH IN SECTION 21168.6.8 OF THE PUBLIC RESOURCES CODE. A COPY OF SECTION 21168.6.8 OF THE PUBLIC RESOURCES CODE IS INCLUDED IN THE APPENDIX TO THIS EIR.
(2)The draft environmental impact report and final environmental impact report shall contain, as an appendix, the full text of this section.
(3)Within 10 days after the release of the draft environmental impact report, the lead agency shall conduct an informational workshop to inform the public of the key analyses and conclusions of that report.
(4)Within 10 days before the close of the public comment period, the lead agency shall hold a public hearing to receive testimony on the draft environmental impact report. A transcript of the hearing shall be included as an appendix to the final environmental impact report.
(5)(A)Within five days following the close of the public comment period, a commenter on the draft environmental impact report may submit to the lead agency a written request for nonbinding mediation. The lead agency and applicant shall participate in nonbinding mediation with all commenters who submitted timely comments on the draft environmental impact report and who requested the mediation. Mediation conducted pursuant to this paragraph shall end no later than 35 days after the close of the public comment period.
(B)A request for mediation shall identify all areas of dispute raised in the comment submitted by the commenter that are to be mediated.
(C)The lead agency shall select one or more mediators who shall be retired judges or recognized experts with at least five years experience in land use and environmental law or science, or mediation. The applicant shall bear the costs of mediation.
(D)A mediation session shall be conducted on each area of dispute with the parties requesting mediation on that area of dispute.
(E)The lead agency shall adopt, as a condition of approval, any measures agreed upon by the lead agency, the applicant, and any commenter who requested mediation. A commenter who agrees to a measure pursuant to this subparagraph shall not raise the issue addressed by that measure as a basis for an action or proceeding challenging the lead agencys decision to certify the environmental impact report or to grant one or more project approvals.
(6)The lead agency need not consider written comments submitted after the close of the public comment period, unless those comments address any of the following:
(A)New issues raised in the response to comments by the lead agency.
(B)New information released by the public agency subsequent to the release of the draft environmental impact report, such as new information set forth or embodied in a staff report, proposed permit, proposed resolution, ordinance, or similar documents.
(C)Changes made to the project after the close of the public comment period.
(D)Proposed conditions for approval, mitigation measures, or proposed findings required by Section 21081 or a proposed reporting and monitoring program required by paragraph (1) of subdivision (a) of Section 21081.6, where the lead agency releases those documents subsequent to the release of the draft environmental impact report.
(E)New information that was not reasonably known and could not have been reasonably known during the public comment period.
(7)The lead agency shall file the notice required by subdivision (a) of Section 21152 within five days after the first discretionary project approval.
(e)(1)The lead agency shall prepare and certify the record of the proceedings in accordance with this subdivision and in accordance with Rule 3.1365 of the California Rules of Court. The applicant shall pay the lead agency for all costs of preparing and certifying the record of proceedings.
(2)No later than three business days following the date of the release of the draft environmental impact report, the lead agency shall make available to the public in a readily accessible electronic format the draft environmental impact report and all other documents submitted to or relied on by the lead agency in the preparation of the draft environmental impact report. A document prepared by the lead agency or submitted by the applicant after the date of the release of the draft environmental impact report that is a part of the record of the proceedings shall be made available to the public in a readily accessible electronic format within five business days after the document is prepared or received by the lead agency.
(3)Notwithstanding paragraph (2), documents submitted to or relied on by the lead agency that were not prepared specifically for the project and are copyright protected are not required to be made readily accessible in an electronic format. For those copyright protected documents, the lead agency shall make an index of these documents available in an electronic format no later than the date of the release of the draft environmental impact report, or within five business days if the document is received or relied on by the lead agency after the release of the draft environmental impact report. The index must specify the libraries or lead agency offices in which hardcopies of the copyrighted materials are available for public review.
(4)The lead agency shall encourage written comments on the project to be submitted in a readily accessible electronic format, and shall make any such comment available to the public in a readily accessible electronic format within five days of its receipt.
(5)Within 14 business days after the receipt of any comment that is not in an electronic format, the lead agency shall convert that comment into a readily accessible electronic format and make it available to the public in that format.
(6)The lead agency shall indicate in the record of the proceedings comments received that were not considered by the lead agency pursuant to paragraph (6) of subdivision (e) and need not include the content of the comments as a part of the record.
(7)Within five days after the filing of the notice required by subdivision (a) of Section 21152, the lead agency shall certify the record of the proceedings for the approval or determination and shall provide an electronic copy of the record to a party that has submitted a written request for a copy. The lead agency may charge and collect a reasonable fee from a party requesting a copy of the record for the electronic copy, which shall not exceed the reasonable cost of reproducing that copy.
(8)Within 10 days after being served with a complaint or a petition for a writ of mandate, the lead agency shall lodge a copy of the certified record of proceedings with the superior court.
(9)Any dispute over the content of the record of the proceedings shall be resolved by the superior court. Unless the superior court directs otherwise, a party disputing the content of the record shall file a motion to augment the record at the time it files its initial brief.
(10)The contents of the record of proceedings shall be as set forth in subdivision (e) of Section 21167.6.
(f)(1)The model, methodology, quantitative or qualitative analysis, performance standards, or thresholds of significance used in the analysis of greenhouse gas emissions impacts or the determination as to the significance of those impacts in the environmental impact report for the project shall not be grounds for relief and shall not be deemed an abuse of discretion in an action or proceeding brought pursuant to this division if both of the following are met:
(A)The greenhouse gas emissions impact analysis concludes that the project is consistent, on balance, with the 201640 Regional Transportation Plan/Sustainable Communities Strategy: A Plan for Mobility, Accessibility, Sustainability and a High Quality of Life adopted by the Southern California Association of Governments in April, 2016.
(B)The greenhouse gas emissions impact analysis includes a comparison of projected greenhouse gas emissions against a baseline for the first year in which the project is anticipated to operate and a discussion of the projects consistency with the target for longer term emissions through 2050, as set forth in the Governors Executive Order No. S-3-05.
(2)The model, methodology, quantitative or qualitative analysis, performance standards, or thresholds of significance used in the analysis of vehicle miles traveled impacts or the determination as to the significance of those impacts in the environmental impact report for the project shall not be grounds for relief and shall not be deemed an abuse of discretion in an action or proceeding brought pursuant to this division if the analysis is consistent with proposed Section 15064.3 of Title 14 of the California Code of Regulations, as published on January 26, 2018.
(g)(1)As a condition of approval of the project subject to this section, the lead agency shall require the applicant, with respect to any measures specific to the operation of the arena, to implement those measures that will meet the requirements of this division by the end of the first NBA regular season or June of the first NBA regular season, whichever is later, during which an NBA team has played at the arena.
(2)To maximize public health, environmental, and employment benefits, the lead agency shall place the highest priority on feasible measures that will reduce the emissions of greenhouse gases in the Inglewood Sports and Entertainment project area and in the neighboring communities of the arena. Mitigation measures that shall be considered and implemented, if feasible and necessary, to achieve the requirement of clause (ii) of subparagraph (A) of paragraph (3) of subdivision (a) according to the following order of priority including, but not limited to:
(A)Project design features or onsite reduction measures or both design features and onsite reduction measures, including any of the following:
(i)Implementing project design features that enable the arena to exceed the building energy efficiency standards set forth in Part 6 of Title 24 of the California Code of Regulations.
(ii)Requiring a transportation management plan or transportation demand management program, or both, to reduce single-occupancy vehicular travel and vehicle miles traveled.
(iii)Using energy produced by renewable resources.
(iv)Providing onsite electric vehicle charging stations in excess of applicable requirements.
(v)Providing dedicated parking for car-share or zero-emission vehicles, or for both types of vehicles in excess of applicable requirements.
(vi)Providing bicycle parking in excess of applicable requirements.
(vii)Providing onsite safety or other improvements for bicycles, pedestrians, and transit connections.
(viii)Providing onsite renewable energy generation.
(ix)Providing solar-ready roofs.
(x)Providing cool roofs and cool parking promoting cool surface treatment for new parking facilities.
(B)Off-site reduction measures, including any of the following:
(i)Temporarily expanding the capacity of a public transit line, as appropriate, to serve arena events.
(ii)Providing private charter buses or other similar services, as needed, to serve arena events.
(iii)Paying its fair share of the cost of measures that expand the capacity of public transit, if appropriate, that is used by spectators attending arena events.
(iv)Providing funding to an off-site mitigation project to generate carbon credits that potentially could consist of replacing buses, trolleys, or other transit vehicles with low-emission or zero-emission vehicles.
(v)Providing off-site safety or other improvements for bicycles, pedestrians, and transit connections.
(C)Offset credits shall be employed by the applicant only after feasible onsite or local emission reduction measures have been implemented. The applicant shall, to the extent feasible, place the highest priority on the purchase of offset credits that produce emission reductions within the City of Inglewood or the boundaries of the South Coast Air Quality Management District.
(h)(1)In granting relief in an action or proceeding brought pursuant to this section, the court shall not stay or enjoin the construction or operation of the project unless the court finds either of the following:
(A)The continued construction or operation of the project presents an imminent threat to the public health and safety.
(B)The project site contains unforeseen important Native American artifacts or unforeseen important historical, archaeological, or ecological values that would be materially, permanently, and adversely affected by the continued construction or operation of the project unless the court stays or enjoins the construction or operation of the project.
(2)If the court finds that subparagraph (A) or (B) of paragraph (1) is satisfied, the court shall only enjoin those specific activities associated with the project that present an imminent threat to public health and safety or that materially, permanently, and adversely affect unforeseen important Native American artifacts or unforeseen important historical, archaeological, or ecological values.
(i) The provisions of this section are severable. If any provision of this section or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
(j)(1)If an environmental impact report is prepared that includes both projects listed in subparagraphs (A) and (B) of paragraph (4) of subdivision (a) and the applicant fails to notify the lead agency prior to the release of the draft environmental impact report for public comment that the applicant is electing to proceed pursuant to this section, this section shall not apply to the project and shall become inoperative on the date of the release of the draft environmental impact report and is repealed on January 1 of the following year.
(2)If an environmental impact report is prepared that includes only one of the projects listed in subparagraphs (A) and (B) of paragraph (3) of subdivision (a) and the applicant for the project included in the environmental impact report fails to notify the lead agency prior to the release of the draft environmental impact report for public comment that the applicant is electing to proceed pursuant to this section, this section shall become inoperative only as to the project listed in subparagraph (A) or (B) of paragraph (3) of subdivision (a) included in that environmental impact report, and shall remain operative as to the remaining projects. If separate environmental impact reports for the projects listed in subparagraphs (A) and (B) of paragraph (3) of subdivision (a) are prepared and the applicants for both projects fail to notify the lead agency as described in this paragraph, this section shall become inoperative on the date of the release of the second draft environmental impact report and is repealed on January 1 of the following year.
(3)The lead agency shall notify the Secretary of State if the applicant pursuant to paragraph (1) or the applicants for both projects pursuant to paragraph (2) fail to notify the lead agency of their election to proceed pursuant to this section.
SEC. 4.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances of the construction of a major new sports venue in the City of Inglewood, a city with the largest minority population in the United States, which will provide essential economic stimulus.
SEC. 5.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
SECTION 1.Section 79786 of the Water Code is amended to read:79786.(a) The bonds authorized by this division shall be prepared, executed, issued, sold, paid, and redeemed as provided in the State General Obligation Bond Law (Chapter 4 (commencing with Section 16720) of Part 3 of Division 4 of Title 2 of the Government Code), and all of the provisions of that law, as that law may be amended, apply to the bonds and to this division, except that the capital asset requirement in subdivisions (a) and (b) of Section 16727 of the Government Code does not apply to the extent that those subdivisions conflict with any other provision of this division.(b)A conflict exists for purpose of subdivision (a) if any provision of this division authorizes, either expressly or by necessary implication, a project or program that would not result in the creation of a capital asset, including projects or programs to prevent or clean up the contamination of groundwater that serves or has served as a source of drinking water described in Chapter 10 (commencing with section 79770), as well as projects or programs described in Section 79775. In addition, projects or programs described in Section 79772 are in conflict with the capital asset requirement described in subdivision (a), and therefore the capital asset requirement does not apply to those projects or programs.SEC. 2.The amendment of Section 79786 of the Water Code made by this act does not constitute a change in, but is declaratory of, existing law. Therefore, the Legislature finds and declares that the amendments made by this act apply retroactively to any bonds issued and sold before the operative date of this act.(a) The bonds authorized by this division shall be prepared, executed, issued, sold, paid, and redeemed as provided in the State General Obligation Bond Law (Chapter 4 (commencing with Section 16720) of Part 3 of Division 4 of Title 2 of the Government Code), and all of the provisions of that law, as that law may be amended, apply to the bonds and to this division, except that the capital asset requirement in subdivisions (a) and (b) of Section 16727 of the Government Code does not apply to the extent that those subdivisions conflict with any other provision of this division.
(b)A conflict exists for purpose of subdivision (a) if any provision of this division authorizes, either expressly or by necessary implication, a project or program that would not result in the creation of a capital asset, including projects or programs to prevent or clean up the contamination of groundwater that serves or has served as a source of drinking water described in Chapter 10 (commencing with section 79770), as well as projects or programs described in Section 79775. In addition, projects or programs described in Section 79772 are in conflict with the capital asset requirement described in subdivision (a), and therefore the capital asset requirement does not apply to those projects or programs.
SEC. 2.The amendment of Section 79786 of the Water Code made by this act does not constitute a change in, but is declaratory of, existing law. Therefore, the Legislature finds and declares that the amendments made by this act apply retroactively to any bonds issued and sold before the operative date of this act.
SECTION 1.Section 19817 of the Business and Professions Code is amended to read:19817.The commission shall establish and appoint a Gaming Policy Advisory Committee of 12 members. The committee shall be composed of five representatives of controlled gambling licensees, five members of the general public, and two members from the department. The executive director shall, from time to time, convene the committee for the purpose of discussing matters of controlled gambling regulatory policy and any other relevant gambling-related issue. The recommendations concerning gambling policy made by the committee shall be presented to the commission, but shall be deemed advisory and not binding on the commission in the performance of its duties or functions. The committee may not advise the commission on Indian gaming.The commission shall establish and appoint a Gaming Policy Advisory Committee of 10 12 members. The committee shall be composed of five representatives of controlled gambling licensees and licensees, five members of the general public in equal numbers. public, and two members from the department. The executive director shall, from time to time, convene the committee for the purpose of discussing matters of controlled gambling regulatory policy and any other relevant gambling-related issue. The recommendations concerning gambling policy made by the committee shall be presented to the commission, but shall be deemed advisory and not binding on the commission in the performance of its duties or functions. The committee may not advise the commission on Indian gaming.
|
Date
|
Status
|
|---|---|
| Sep 30, 2018 | Chaptered by Secretary of State - Chapter 961, Statutes of 2018. |
| Sep 30, 2018 | Approved by the Governor. |
| Sep 11, 2018 | Enrolled and presented to the Governor at 4:30 p.m. |
| Aug 31, 2018 | Joint Rule 62(a), file notice suspended. |
| Aug 31, 2018 | Read third time. Passed. Ordered to the Assembly. |
| Aug 29, 2018 | Withdrawn from committee. |
| Aug 27, 2018 | Re-referred to Com. on RLS. |
| Aug 21, 2018 | Read second time and amended. Ordered to third reading. |
| Aug 20, 2018 | From committee: Amend, and do pass as amended. (Ayes 7. Noes 0.) (August 16). |
| Aug 16, 2018 | In committee: Reconsideration of a favorable vote granted. |
| Aug 13, 2018 | In committee: Referred to APPR. suspense file. |
| Aug 6, 2018 | In committee: Hearing postponed by committee. |
| Jul 3, 2018 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 2, 2018 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 5. Noes 1.) (June 26). |
| Jun 21, 2018 | From committee: Do pass and re-refer to Com. on JUD. (Ayes 7. Noes 0.) (June 20). Re-referred to Com. on JUD. |
| Jun 13, 2018 | Re-referred to Coms. on EQ. and JUD. |
| Jun 7, 2018 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on RLS. |
| Sep 11, 2017 | Re-referred to Com. on RLS. pursuant to Senate Rule 29.10(c). |
| Sep 11, 2017 | Read second time. Ordered to third reading. |
| Sep 8, 2017 | Read second time and amended. Ordered returned to second reading. |
| Sep 7, 2017 | From inactive file. |
| Jul 13, 2017 | Ordered to inactive file at the request of Senator Lara. |
| Jun 27, 2017 | Read second time. Ordered to third reading. |
| Jun 26, 2017 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| Jun 13, 2017 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 10. Noes 0.) (June 13). Re-referred to Com. on APPR. |
| May 18, 2017 | Referred to Com. on G.O. |
| May 4, 2017 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 4, 2017 | Read third time. Passed. Ordered to the Senate. (Ayes 76. Noes 0. Page 1392.) |
| Apr 27, 2017 | Read second time. Ordered to Consent Calendar. |
| Apr 26, 2017 | From committee: Do pass. To Consent Calendar. (Ayes 16. Noes 0.) (April 26). |
| Mar 30, 2017 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 20. Noes 0.) (March 29). Re-referred to Com. on APPR. |
| Mar 2, 2017 | Referred to Com. on G.O. |
| Feb 17, 2017 | From printer. May be heard in committee March 19. |
| Feb 16, 2017 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 31, 2018 | AB 987 Kamlager-Dove Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Aug 31, 2018 | Assembly 3rd Reading AB987 Kamlager-Dove et al. By Bradford | Senate Floor |
Passed |
|
| Aug 31, 2018 | With recommendation: That Senate amendments be concurred in. | Assembly Standing Committee on Natural Resources |
Passed |
|
| Aug 16, 2018 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| Aug 16, 2018 | [08-16-2018] set for [First] hearing: Reconsideration of favorable vote granted | Senate Standing Committee on Appropriations |
Passed |
|
| Aug 16, 2018 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| Aug 13, 2018 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jun 26, 2018 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Judiciary |
Passed |
|
| Jun 20, 2018 | Do pass, but first be re-referred to the Committee on [Judiciary] | Senate Standing Committee on Environmental Quality |
Passed |
|
| Jun 13, 2017 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Governmental Organization |
Passed |
|
| May 4, 2017 | AB 987 GARCIA, C. Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| Apr 26, 2017 | Do pass. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| Mar 29, 2017 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Governmental Organization |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Date of Hearing: August 31, 2018
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Al Muratsuchi, Acting Chair
ABPCA Bill Id:AB 987 (
Author:Kamlager-Dove) – As Amended Ver:August 27, 2018
SUBJECT: California Environmental Quality Act: sports and entertainment project
SUMMARY: Establishes special procedures for California Environmental Quality Act (CEQA) review, additional conditions for certification, and expedited (270 day) judicial review for a proposed basketball arena and related development in the City of Inglewood.
Specifically, this bill:
- Applies to a project – consisting of an 18,000-20,000 seat basketball arena (proposed as the future home for the Los Angeles Clippers), practice and training facility, related parking and access, infrastructure construction or relocation, landscaping, up to 75,000 square feet associated office, up to 30,000 square feet sports medicine clinic, up to 70,000 square feet of ancillary retail, restaurant, community space and similar uses, and a hotel located on a 35 acre parcel in the City of Inglewood (across West Century Boulevard from the Hollywood Park Casino) – that meets the following conditions:
- Receives Leadership in Energy and Environmental Design (LEED) gold certification within one year of completion of the first NBA season.
- Requires a transportation demand management (TDM) program, as defined, that, upon full implementation, will achieve and maintain a 15-percent reduction in vehicle trips as soon as feasible. Requires each measure in the TDM program to be implemented as soon as feasible, a 7.5-percent reduction by the end of the first NBA season, a 15-percent reduction no later than January 1, 2030, verification, and, if the applicant fails to verify that the 15-percent reduction has been achieved, a 17-percent reduction, or 20-percent reduction if there is a rail transit line with a stop within one-quarter mile of the arena, by January 1, 2035.
- Authorizes the Governor to certify the project for streamlining if all of the following conditions are met:
- The project will result in a minimum investment of $100 million in California upon completion of construction.
- The project creates high-wage, highly skilled jobs that pay prevailing wages and living wages, provides construction jobs and permanent jobs for Californians, and helps reduce unemployment.
- Contractors and subcontractors pay to all construction workers employed in the execution of the project at least the general prevailing rate of per diem wages. Provides that this obligation may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to relevant provisions of the Labor Code, unless all contractors and subcontractors performing work on the project are subject to a project labor agreement that requires the payment of prevailing wages and provides for enforcement through an arbitration procedure.
- The project does not result in any net additional greenhouse gas (GHG) emissions, including emissions from employee transportation, as determined by the Air Resources Board (ARB).
- The applicant demonstrates compliance with the requirement that generators of commercial solid waste and large amounts of organic waste arrange for recycling services for those materials.
- The project applicant has entered into a binding and enforceable agreement that all mitigation measures required under CEQA and any other environmental measures required by this bill shall be conditions of approval of the project, and those conditions will be fully enforceable by the lead agency or another agency designated by the lead agency. In the case of environmental mitigation measures and any other environmental measures required by this bill, the applicant agrees, as an ongoing obligation, that those measures will be monitored and enforced by the lead agency for the life of the obligation.
- The project applicant agrees to pay any additional costs incurred by the courts in hearing and deciding any case, including payment of the costs for the appointment of a special master if deemed appropriate by the court, in a form and manner specified by the Judicial Council.
- The project applicant agrees to pay the costs of preparing the administrative record for the project concurrent with review and consideration of the project pursuant to CEQA, in a form and manner specified by the lead agency for the project.
- Requires the Governor, prior to certifying the project, to make a determination that each of the conditions specified above has been met. These findings are not subject to judicial review.
- If the Governor determines that the project is eligible for streamlining, requires the Governor to submit that determination, and any supporting information, to the Joint Legislative Budget Committee (JLBC) for review and concurrence or non-concurrence.
- Requires the JLBC to concur or non-concur in writing within 30 days of receiving the Governor's determination.
- Deems the project certified if the JLBC fails to concur or non-concur on a determination by the Governor within 30 days of the submittal.
- Provides that the guidelines issued for AB 900 (Buchanan), Chapter 354, Statutes of 2011, apply to the extent they are applicable and do not conflict with specific requirements of this bill.
- Requires the lead agency, within 10 days of certification by the Governor, to issue a specified public notice that the project is subject to procedures of this bill.
- Provides that Rules of Court 3.2220 to 3.2237, adopted by the Judicial Council pursuant to AB 900, apply to a lawsuit challenging the certification of the environmental impact report (EIR) or any project approvals for a certified project, requiring resolution of the lawsuit, including any appeals, within 270 days, to the extent feasible, of the filing of the certified record of proceedings with the court.
- Establishes specified requirements for preparation and certification of the administrative record for the project. Requires the lead agency to prepare the record concurrently with the administrative process, provide all EIR documents and comments in an electronic format (with the exception of certain copyright-protected documents), and certify the record within five days of filing the notice of determination.
- Requires the lead agency, as a condition of approval of the project, to require the applicant, with respect to any measures specific to the operation of the arena, to implement measures that will meet the requirements of CEQA by the end of the first NBA regular season or June of the first NBA regular season, whichever is later, during which an NBA team has played at the arena.
- Requires the lead agency, to maximize public health, environmental, and employment benefits, to require measures that will reduce GHG emissions in the project area and in the neighboring communities of the arena.
- Provides that not less than 50 percent of the GHG emissions reductions necessary to achieve zero net additional GHG emissions shall be from local, direct GHG emissions reduction measures, including, but not limited to, any of the following:
- Project design features or onsite reduction measures, or both design features and onsite reduction measures, including specified measures.
- Off-site reduction measures in the neighboring communities, including specified measures.
- Permits the applicant to obtain offset credits for up to 50 percent of the GHG emissions reductions necessary to achieve zero net additional GHG emissions.
- Requires the applicant, to the extent feasible, to place the highest priority on the purchase of offset credits that produce emission reductions within the City of Inglewood or the boundaries of the South Coast Air Quality Management District (SCAQMD).
- Requires any offset credits to be verified by a third party accredited by ARB.
- Prohibits the use of offset credits generated by a project located outside the United States.
- Requires the lead agency, as a condition of approval of the project, to require the applicant, in consultation with SCAQMD, to implement measures that will achieve criteria pollutant and toxic air contaminant reductions, over and above any emission reductions required by other laws or regulations, in communities surrounding the project consistent with emission reduction measures that may be identified for those communities pursuant to AB 617 (C. Garcia), Chapter 136, Statutes of 2017.
- Requires these measures achieve emissions reductions of at least 400 tons of oxides of nitrogen (NOx) and 10 tons of PM2.5 over 10 years following the commencement of construction of the project, with a minimum of 130 tons of NOx and 3 tons of PM2.5 achieved within the first year.
- If the applicant can demonstrate and verify to SCAQMD that it has invested at least $30 million to achieve these requirements, the requirements shall be deemed met, so long as one-half of the reductions set forth above are met.
- Provides that the bill does not apply to a project that proposes the construction of a new gambling establishment, as defined.
- Provides that the provisions of the bill are severable.
- Repeals the provisions of the bill as of January 1, 2025, if the lead agency has not certified an EIR for the project by that date.
EXISTING LAW:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or EIR for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines).
- Authorizes judicial review of CEQA actions taken by public agencies, following the agency's decision to carry out or approve the project. Challenges alleging improper determination that a project may have a significant effect on the environment, or alleging an EIR doesn't comply with CEQA, must be filed in the Superior Court within 30 days of filing of the notice of approval. The courts are required to give CEQA actions preference over all other civil actions.
- Pursuant to AB 900, establishes procedures for expedited judicial review (i.e., requiring the courts to resolve lawsuits within 270 days, to the extent feasible) for "environmental leadership" projects certified by the Governor and meeting specified conditions, including LEED gold-certified infill site projects achieving transportation efficiency 15 percent greater than comparable projects and zero net additional GHG emissions. AB 900 sunsets January 1, 2021.
FISCAL EFFECT: According to the Senate Appropriations Committee, this bill would have a fiscal impact of $173,000 (various funds) for ARB to analyze and certify that a project will not result in any net additional GHG emissions, minor and absorbable costs for Judicial Council to review and revise the rules of the court to meet the requirements of this bill, and minor and absorbable costs for the Office of Planning and Research to process a judicial streamlining request.
COMMENTS:
- Author's statement:
This bill will facilitate an amazing project to bring real economic benefits to families in the entire region, including over 10,000 construction jobs and 1,400 permanent jobs…the bill also establishes the highest level of environmental protections and benefits to the region, including “carbon emission neutrality,” local mitigation requirements and other criteria pollutant reductions.
- Background. CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
CEQA actions taken by public agencies can be challenged in Superior Court once the agency approves or determines to carry out the project. CEQA appeals are subject to unusually short statutes of limitations. Under current law, court challenges of CEQA decisions generally must be filed within 30 to 35 days, depending on the type of decision. The courts are required to give CEQA actions preference over all other civil actions. The petitioner must request a hearing within 90 days of filing the petition and, generally, briefing must be completed within 90 days of the request for hearing. There is no deadline specified for the court to render a decision.
In 2011, AB 900 and SB 292 (Padilla), Chapter 353, Statutes of 2011, established expedited CEQA judicial review procedures for a limited number of projects. For AB 900, it was large-scale projects meeting extraordinary environmental standards and providing significant jobs and investment. For SB 292, it was a proposed downtown Los Angeles football stadium and convention center project achieving specified traffic and air quality mitigations. For these eligible projects, the bills provided for original jurisdiction by the Court of Appeal and a compressed schedule requiring the court to render a decision on any lawsuit within 175 days. This promised to reduce the existing judicial review timeline by 100 days or more, while creating new burdens for the courts and litigants to meet the compressed schedule. AB 900's provision granting original jurisdiction to the Court of Appeal was invalidated in 2013 by a decision in Alameda Superior Court in Planning and Conservation League v. State of California. AB 900 was subsequently revised to restore jurisdiction to superior courts and require resolution of lawsuits within 270 days.
Only two projects have used the judicial review procedures enacted since 2011: the Sacramento Kings arena project under SB 743 (Steinberg), Chapter 386, Statutes of 2013; and the Golden State Warriors arena project in San Francisco under AB 900. CEQA lawsuits were filed against both projects, and the lawsuits, including appeals, were resolved, in favor of the applicants, within the 270-day timeline.
To date, 11 projects have been certified under AB 900:
- McCoy Solar Energy Project in Riverside County.
- Apple Campus 2 in Cupertino.
- Soitec Solar Energy Project in San Diego County.
- 8150 Sunset Boulevard, a mixed-use commercial and residential project in Hollywood.
- Event Center and Mixed-Use Development at Mission Bay Blocks (i.e., Warriors Arena) in San Francisco.
- Qualcomm Stadium Reconstruction Project in San Diego.
- 6701 Sunset/Crossroads, a mixed-use residential, hotel, and commercial project in Hollywood.
- Yucca-Argyle Project, a mixed-use residential, hotel, and commercial project in Hollywood.
- 10 Van Ness Avenue, a mixed-use commercial/residential redevelopment project in San Francisco.
- 1045 Olive Street Project, a mixed-use commercial/residential redevelopment project in downtown Los Angeles.
- Hollywood Center Project, a mixed-use project in Hollywood.
- Comparison to AB 900. This bill is substantially equivalent to AB 900 on key requirements – including LEED gold certification, GHG neutrality, traffic efficiency, and construction wages – with the following exceptions:
- Traffic efficiency – This bill delays required achievement of 15 percent trip reduction for as many as five years, to January 1, 2030, while adding a first year target of 7.5 percent, reporting and verification, and a penalty of an additional 2 to 5 percent reduction if the target is not achieved.
- GHG neutrality – This bill imposes additional conditions, requiring 50 percent of GHG reductions necessary to meet GHG neutrality to come from on-site and local reduction measures, and limiting the use of offsets.
- Local clean air – This bill imposes additional, new requirements to reduce 400 tons NOx and 10 tons PM2.5, subject to a $30 million investment cap.
- Bill raises the bar on GHG mitigation and clean air. Following the enactment of AB 32 in 2006, SB 97 was enacted in 2007 to confirm the requirement to address environmental impacts of GHG emissions under CEQA and require the adoption of CEQA Guidelines for the mitigation of GHG emissions or the effects of GHG emissions, including effects associated with transportation or energy consumption. SB 97 requires the CEQA Guidelines to be periodically updated to incorporate new information or criteria established by ARB pursuant to AB 32.
Under CEQA Guidelines adopted pursuant to SB 97, a project’s GHG emissions can be reduced by “off-site measures, including offsets that are not otherwise required” and “measures that sequester greenhouse gases.” The CEQA Guidelines allow projects to reduce GHG emissions by relying on voluntary market offsets that are not otherwise required as well as other offsite and sequestration measures that result in GHG reductions.
When it was enacted in 2011, AB 900 required projects to achieve GHG neutrality, without specifying how. In practice, the AB 900 projects have relied heavily on voluntary offsets. Meanwhile, California's climate policy has focused increasingly on achieving local clean air co-benefits and reducing the reliance on offsets. Last year, the Legislature's extension of the cap-and-trade program, AB 398, included a reduction in total amount of offsets that may be used for compliance, coupled with a requirement that at least half of offsets result in environmental benefits within California. A companion measure, AB 617, focused on improving local air quality by updating pollution controls at large industrial facilities in the cap-and-trade program and implementing community-based emission reduction programs in the most pollution-burdened communities.
At the same time, CEQA practice has demonstrated the feasibility of GHG mitigation plans that incorporate significant on-site and local direct GHG reduction measures, rather than relying entirely on offsets to mitigate projects' GHG emissions. For example, Newhall Ranch, a large project of over 20,000 homes and related development in Los Angeles County near Santa Clarita, was approved in 2017 once the developer committed to "achieve zero net GHG emissions using feasible and reliable emission-reduction actions related to the land development project, the implementation of direct measures to reduce GHG emissions offsite, and the procurement of GHG offsets." To achieve net zero GHG, 13 mitigation measures were adopted for Newhall Ranch, including on-site, off-site and offsets. In total, approximately 55 percent of the GHG reductions will come from on-site and local direct reduction measures, with the balance from offset projects, including some located in California.
This bill, along with AB 734 (Bonta), specifically requires on-site and local direct GHG reduction measures, and imposes specific limits on the use of offsets, in CEQA statute for the first time.
- Opposition arguments. MSG Forum:
The Clippers argue that they need special legislation because their lease at Staples Center expires in June 2024 and they cannot get their EIR completed before AB 900 sunsets. By the City of Inglewood’s own published schedule for the EIR that simply is not true. AB 900 only requires that a project be approved before January 1, 2021. The Clippers have already started the CEQA process and Inglewood has stated it will be completed by summer 2019. Approval in 2019 is a full two years before AB 900 will expire. AB 900 provides the Clippers more than enough time.
The Clippers also are asking for a lengthy delay in meeting transit goals. That would be a disaster for the community, including the Forum and the new NFL stadium. If the Clippers do not meet the required transit goals until six years after the arena opens, then the existing surrounding community and businesses will be severely impacted. The Clippers should be required to meet transit goals as provided in AB 900.
Judicial Council:
Providing expedited judicial review for the specific projects covered by AB 987 while other cases proceed under the usual civil procedure rules and timelines undermines equal access to justice. The courts are charged with dispensing equal access to justice for each and every case on their dockets. Singling out this particular type of case for such preferential treatment is fundamentally at odds with how our justice system has historically functioned, and is an injustice to all of the other litigants who have important cases pending before the courts.
- Related legislation. AB 734 (Bonta) establishes similar procedures and conditions, and 270 day judicial review, for a proposed baseball park and mixed-use development in the City of Oakland.
SB 789 (Bradford) limits CEQA review and expedites judicial review of a basketball arena and other related projects within the Inglewood Sports and Entertainment Project (ISEP). SB 789 failed in this committee by a vote of 4-5 on September 8, 2017.
- Assembly Rule 77.2. This bill has been referred to this committee pursuant to Assembly Rule 77.2 for review of substantial Senate amendments. It may not be amended and, if it passes, will be returned to the Assembly Floor for a final concurrence vote.
REGISTERED SUPPORT / OPPOSITION:
Support
Al’s Powerwash
American Federation of State, County and Municipal Employees (AFSCME)
California Conference of Carpenters
California State Association of Electrical Workers
California State Council of Laborers
California State Pipe Trades Council
California Legislative Black Caucus
California Lieutenant Governor Gavin Newsom
California Teamsters Public Affairs Council
California-Nevada Conference of Operating Engineers
City of Carson
City of El Segundo
City of Gardena
City of Hawthorne
City of Hermosa Beach
City of Inglewood Mayor James Butts
City of Lawndale
City of Lomita
City of Los Angeles District #15
City of Manhattan Beach
City of Palos Verdes Estates
City of Rancho Palos Verdes
City of Redondo Beach
City of Rolling Hills
City of Rolling Hills Estates
City of Torrance
County of Los Angeles
FASTSIGNS, Inglewood/LAX
Inglewood Airport Area Chamber of Commerce
Inglewood Rotary Club
JAMZ Creamery
LAX Tacos
Marvin Engineering
MiddleBar
Painters and Allied Trades District Council 36
Pastor Stanley Prince
Pastor Williams, True Vine Baptist Church
State Building and Construction Trades Council
Western States Council of Sheet Metal Workers
WLM Financial
2 Individuals
Oppose
Inglewood Residents Against Takings and Evictions (IRATE)
Judicial Council of California
MSG Forum
Sierra Club California
2 Individuals
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
CONCURRENCE IN SENATE AMENDMENTS
CSA2 Bill Id:AB 987
Author:(Kamlager-Dove)
As Amended Ver:August 27, 2018
Majority vote
ASSEMBLY: |
| (May 4, 2018) | SENATE: | 34-0 | (August 31, 2018) |
(vote not relevant)
COMMITTEE VOTE: | 6-3 | (August 31, 2018) | RECOMMENDATION: | concur |
(Nat. Res.)
Original Committee Reference: G. O.
SUMMARY: Establishes special procedures for California Environmental Quality Act (CEQA) review, additional conditions for certification, and expedited (270 day) judicial review for a proposed basketball arena and related development in the City of Inglewood. Specifically, this bill:
- Applies to a project – consisting of an 18,000-20,000 seat basketball arena (proposed as the future home for the Los Angeles Clippers), practice and training facility, related parking and access, infrastructure construction or relocation, landscaping, up to 75,000 square feet associated office, up to 30,000 square feet sports medicine clinic, up to 70,000 square feet of ancillary retail, restaurant, community space and similar uses, and a hotel located on a 35 acre parcel in the City of Inglewood (across West Century Boulevard from the Hollywood Park Casino) – that meets the following conditions:
- Receives Leadership in Energy and Environmental Design (LEED) gold certification within one year of completion of the first NBA season.
- Requires a transportation demand management (TDM) program, as defined, that, upon full implementation, will achieve and maintain a 15% reduction in vehicle trips as soon as feasible. Requires each measure in the TDM program to be implemented as soon as feasible, a 7.5% reduction by the end of the first NBA season, a 15% reduction no later than January 1, 2030, verification, and, if the applicant fails to verify that the 15% reduction has been achieved, a 17% reduction, or 20% reduction if there is a rail transit line with a stop within one-quarter mile of the arena, by January 1, 2035.
- Authorizes the Governor to certify the project for streamlining if all of the following conditions are met:
- The project will result in a minimum investment of $100 million in California upon completion of construction.
- The project creates high-wage, highly skilled jobs that pay prevailing wages and living wages, provides construction jobs and permanent jobs for Californians, and helps reduce unemployment.
- Contractors and subcontractors pay to all construction workers employed in the execution of the project at least the general prevailing rate of per diem wages. Provides that this obligation may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to relevant provisions of the Labor Code, unless all contractors and subcontractors performing work on the project are subject to a project labor agreement that requires the payment of prevailing wages and provides for enforcement through an arbitration procedure.
- The project does not result in any net additional greenhouse gas (GHG) emissions, including emissions from employee transportation, as determined by the Air Resources Board (ARB).
- The applicant demonstrates compliance with the requirement that generators of commercial solid waste and large amounts of organic waste arrange for recycling services for those materials.
- The project applicant has entered into a binding and enforceable agreement that all mitigation measures required under CEQA and any other environmental measures required by this bill shall be conditions of approval of the project, and those conditions will be fully enforceable by the lead agency or another agency designated by the lead agency. In the case of environmental mitigation measures and any other environmental measures required by this bill, the applicant agrees, as an ongoing obligation, that those measures will be monitored and enforced by the lead agency for the life of the obligation.
- The project applicant agrees to pay any additional costs incurred by the courts in hearing and deciding any case, including payment of the costs for the appointment of a special master if deemed appropriate by the court, in a form and manner specified by the Judicial Council.
- The project applicant agrees to pay the costs of preparing the administrative record for the project concurrent with review and consideration of the project pursuant to CEQA, in a form and manner specified by the lead agency for the project.
- Requires the Governor, prior to certifying the project, to make a determination that each of the conditions specified above has been met. These findings are not subject to judicial review.
- If the Governor determines that the project is eligible for streamlining, requires the Governor to submit that determination, and any supporting information, to the Joint Legislative Budget Committee (JLBC) for review and concurrence or non-concurrence.
- Requires the JLBC to concur or non-concur in writing within 30 days of receiving the Governor's determination.
- Deems the project certified if the JLBC fails to concur or non-concur on a determination by the Governor within 30 days of the submittal.
- Provides that the guidelines issued for AB 900 (Buchanan), Chapter 354, Statutes of 2011, apply to the extent they are applicable and do not conflict with specific requirements of this bill.
- Requires the lead agency, within 10 days of certification by the Governor, to issue a specified public notice that the project is subject to procedures of this bill.
- Provides that Rules of Court 3.2220 to 3.2237, adopted by the Judicial Council pursuant to AB 900, apply to a lawsuit challenging the certification of the environmental impact report (EIR) or any project approvals for a certified project, requiring resolution of the lawsuit, including any appeals, within 270 days, to the extent feasible, of the filing of the certified record of proceedings with the court.
- Establishes specified requirements for preparation and certification of the administrative record for the project. Requires the lead agency to prepare the record concurrently with the administrative process, provide all EIR documents and comments in an electronic format (with the exception of certain copyright-protected documents), and certify the record within five days of filing the notice of determination.
- Requires the lead agency, as a condition of approval of the project, to require the applicant, with respect to any measures specific to the operation of the arena, to implement measures that will meet the requirements of CEQA by the end of the first NBA regular season or June of the first NBA regular season, whichever is later, during which an NBA team has played at the arena.
- Requires the lead agency, to maximize public health, environmental, and employment benefits, to require measures that will reduce GHG emissions in the project area and in the neighboring communities of the arena.
- Provides that not less than 50% of the GHG emissions reductions necessary to achieve zero net additional GHG emissions shall be from local, direct GHG emissions reduction measures, including, but not limited to, any of the following:
- Project design features or onsite reduction measures, or both design features and onsite reduction measures, including specified measures.
- Off-site reduction measures in the neighboring communities, including specified measures.
- Permits the applicant to obtain offset credits for up to 50% of the GHG emissions reductions necessary to achieve zero net additional GHG emissions.
- Requires the applicant, to the extent feasible, to place the highest priority on the purchase of offset credits that produce emission reductions within the City of Inglewood or the boundaries of the South Coast Air Quality Management District (SCAQMD).
- Requires any offset credits to be verified by a third party accredited by ARB.
- Prohibits the use of offset credits generated by a project located outside the United States.
- Requires the lead agency, as a condition of approval of the project, to require the applicant, in consultation with SCAQMD, to implement measures that will achieve criteria pollutant and toxic air contaminant reductions, over and above any emission reductions required by other laws or regulations, in communities surrounding the project consistent with emission reduction measures that may be identified for those communities pursuant to AB 617 (C. Garcia), Chapter 136, Statutes of 2017.
- Requires these measures achieve emissions reductions of at least 400 tons of oxides of nitrogen (NOx) and 10 tons of PM2.5 over 10 years following the commencement of construction of the project, with a minimum of 130 tons of NOx and 3 tons of PM2.5 achieved within the first year.
- If the applicant can demonstrate and verify to SCAQMD that it has invested at least $30 million to achieve these requirements, the requirements shall be deemed met, so long as one-half of the reductions set forth above are met.
- Provides that the bill does not apply to a project that proposes the construction of a new gambling establishment, as defined.
- Provides that the provisions of the bill are severable.
- Repeals the provisions of the bill as of January 1, 2025, if the lead agency has not certified an EIR for the project by that date.
EXISTING LAW:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or EIR for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines).
- Authorizes judicial review of CEQA actions taken by public agencies, following the agency's decision to carry out or approve the project. Challenges alleging improper determination that a project may have a significant effect on the environment, or alleging an EIR doesn't comply with CEQA, must be filed in the Superior Court within 30 days of filing of the notice of approval. The courts are required to give CEQA actions preference over all other civil actions.
- Pursuant to AB 900 (Buchanan), Chapter 354, Statutes of 2011, establishes procedures for expedited judicial review (i.e., requiring the courts to resolve lawsuits within 270 days, to the extent feasible) for "environmental leadership" projects certified by the Governor and meeting specified conditions, including LEED gold-certified infill site projects achieving transportation efficiency 15% greater than comparable projects and zero net additional GHG emissions. AB 900 sunsets January 1, 2021.
FISCAL EFFECT: According to the Senate Appropriations Committee, this bill would have a fiscal impact of $173,000 (various funds) for ARB to analyze and certify that a project will not result in any net additional GHG emissions, minor and absorbable costs for Judicial Council to review and revise the rules of the court to meet the requirements of this bill, and minor and absorbable costs for the Office of Planning and Research to process a judicial streamlining request.
COMMENTS:
- Author's statement:
This bill will facilitate an amazing project to bring real economic benefits to families in the entire region, including over 10,000 construction jobs and 1,400 permanent jobs…the bill also establishes the highest level of environmental protections and benefits to the region, including "carbon emission neutrality," local mitigation requirements and other criteria pollutant reductions.
- Background. CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
CEQA actions taken by public agencies can be challenged in Superior Court once the agency approves or determines to carry out the project. CEQA appeals are subject to unusually short statutes of limitations. Under current law, court challenges of CEQA decisions generally must be filed within 30 to 35 days, depending on the type of decision. The courts are required to give CEQA actions preference over all other civil actions. The petitioner must request a hearing within 90 days of filing the petition and, generally, briefing must be completed within 90 days of the request for hearing. There is no deadline specified for the court to render a decision.
In 2011, AB 900 and SB 292 (Padilla), Chapter 353, Statutes of 2011, established expedited CEQA judicial review procedures for a limited number of projects. For AB 900, it was large-scale projects meeting extraordinary environmental standards and providing significant jobs and investment. For SB 292, it was a proposed downtown Los Angeles football stadium and convention center project achieving specified traffic and air quality mitigations. For these eligible projects, the bills provided for original jurisdiction by the Court of Appeal and a compressed schedule requiring the court to render a decision on any lawsuit within 175 days. This promised to reduce the existing judicial review timeline by 100 days or more, while creating new burdens for the courts and litigants to meet the compressed schedule. AB 900's provision granting original jurisdiction to the Court of Appeal was invalidated in 2013 by a decision in Alameda Superior Court in Planning and Conservation League v. State of California. AB 900 was subsequently revised to restore jurisdiction to superior courts and require resolution of lawsuits within 270 days.
Only two projects have used the judicial review procedures enacted since 2011: the Sacramento Kings arena project under SB 743 (Steinberg), Chapter 386, Statutes of 2013; and the Golden State Warriors arena project in San Francisco under AB 900. CEQA lawsuits were filed against both projects, and the lawsuits, including appeals, were resolved, in favor of the applicants, within the 270-day timeline.
To date, 11 projects have been certified under AB 900:
- McCoy Solar Energy Project in Riverside County.
- Apple Campus 2 in Cupertino.
- Soitec Solar Energy Project in San Diego County.
- 8150 Sunset Boulevard, a mixed-use commercial and residential project in Hollywood.
- Event Center and Mixed-Use Development at Mission Bay Blocks (i.e., Warriors Arena) in San Francisco.
- Qualcomm Stadium Reconstruction Project in San Diego.
- 6701 Sunset/Crossroads, a mixed-use residential, hotel, and commercial project in Hollywood.
- Yucca-Argyle Project, a mixed-use residential, hotel, and commercial project in Hollywood.
- 10 Van Ness Avenue, a mixed-use commercial/residential redevelopment project in San Francisco.
- 1045 Olive Street Project, a mixed-use commercial/residential redevelopment project in downtown Los Angeles.
- Hollywood Center Project, a mixed-use project in Hollywood.
- Comparison to AB 900. This bill is substantially equivalent to AB 900 on key requirements – including LEED gold certification, GHG neutrality, traffic efficiency, and construction wages – with the following exceptions:
- Traffic efficiency – This bill delays required achievement of 15% trip reduction for as many as five years, to January 1, 2030, while adding a first year target of 7.5%, reporting and verification, and a penalty of an additional 2 to 5% reduction if the target is not achieved.
- GHG neutrality – This bill imposes additional conditions, requiring 50% of GHG reductions necessary to meet GHG neutrality to come from on-site and local reduction measures, and limiting the use of offsets.
- Local clean air – This bill imposes additional, new requirements to reduce 400 tons NOx and 10 tons PM2.5, subject to a $30 million investment cap.
- Bill raises the bar on GHG mitigation and clean air. Following the enactment of AB 32 (Nunez and Pavley) Chapter 488 in 2006, SB 97 (Dutton) Chapter 185 was enacted in 2007 to confirm the requirement to address environmental impacts of GHG emissions under CEQA and require the adoption of CEQA Guidelines for the mitigation of GHG emissions or the effects of GHG emissions, including effects associated with transportation or energy consumption. SB 97 requires the CEQA Guidelines to be periodically updated to incorporate new information or criteria established by ARB pursuant to AB 32.
Under CEQA Guidelines adopted pursuant to SB 97, a project’s GHG emissions can be reduced by "off-site measures, including offsets that are not otherwise required" and "measures that sequester greenhouse gases." The CEQA Guidelines allow projects to reduce GHG emissions by relying on voluntary market offsets that are not otherwise required as well as other offsite and sequestration measures that result in GHG reductions.
When it was enacted in 2011, AB 900 required projects to achieve GHG neutrality, without specifying how. In practice, the AB 900 projects have relied heavily on voluntary offsets. Meanwhile, California's climate policy has focused increasingly on achieving local clean air co-benefits and reducing the reliance on offsets. Last year, the Legislature's extension of the cap-and-trade program, AB 398, included a reduction in total amount of offsets that may be used for compliance, coupled with a requirement that at least half of offsets result in environmental benefits within California. A companion measure, AB 617, focused on improving local air quality by updating pollution controls at large industrial facilities in the cap-and-trade program and implementing community-based emission reduction programs in the most pollution-burdened communities.
At the same time, CEQA practice has demonstrated the feasibility of GHG mitigation plans that incorporate significant on-site and local direct GHG reduction measures, rather than relying entirely on offsets to mitigate projects' GHG emissions. For example, Newhall Ranch, a large project of over 20,000 homes and related development in Los Angeles County near Santa Clarita, was approved in 2017 once the developer committed to "achieve zero net GHG emissions using feasible and reliable emission-reduction actions related to the land development project, the implementation of direct measures to reduce GHG emissions offsite, and the procurement of GHG offsets." To achieve net zero GHG, 13 mitigation measures were adopted for Newhall Ranch, including on-site, off-site and offsets. In total, approximately 55% of the GHG reductions will come from on-site and local direct reduction measures, with the balance from offset projects, including some located in California.
This bill, along with AB 734 (Bonta), specifically requires on-site and local direct GHG reduction measures, and imposes specific limits on the use of offsets, in CEQA statute for the first time.
- Opposition arguments. MSG Forum:
The Clippers argue that they need special legislation because their lease at Staples Center expires in June 2024 and they cannot get their EIR completed before AB 900 sunsets. By the City of Inglewood’s own published schedule for the EIR that simply is not true. AB 900 only requires that a project be approved before January 1, 2021. The Clippers have already started the CEQA process and Inglewood has stated it will be completed by summer 2019. Approval in 2019 is a full two years before AB 900 will expire. AB 900 provides the Clippers more than enough time.
The Clippers also are asking for a lengthy delay in meeting transit goals. That would be a disaster for the community, including the Forum and the new NFL stadium. If the Clippers do not meet the required transit goals until six years after the arena opens, then the existing surrounding community and businesses will be severely impacted. The Clippers should be required to meet transit goals as provided in AB 900.
Judicial Council:
Providing expedited judicial review for the specific projects covered by AB 987 while other cases proceed under the usual civil procedure rules and timelines undermines equal access to justice. The courts are charged with dispensing equal access to justice for each and every case on their dockets. Singling out this particular type of case for such preferential treatment is fundamentally at odds with how our justice system has historically functioned, and is an injustice to all of the other litigants who have important cases pending before the courts.
- Related legislation. AB 734 (Bonta) of the current legislative session establishes similar procedures and conditions, and 270 day judicial review, for a proposed baseball park and mixed-use development in the City of Oakland.
SB 789 (Bradford) of 2017 limits CEQA review and expedites judicial review of a basketball arena and other related projects within the Inglewood Sports and Entertainment Project (ISEP). SB 789 failed in this committee by a vote of 4-5 on September 8, 2017.
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. / (916) 319-2092 FN: 0005222
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB |
THIRD READING
Bill No: AB 987
:
PRIOR VOTES NOT RELEVANT
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 7-0, 6/20/18 (Pursuant to Senate Rule 29.10)
AYES: Wieckowski, Stone, Gaines, Hill, Lara, Skinner, Stern
SENATE JUDICIARY COMMITTEE: 5-1, 6/26/18
AYES: Jackson, Anderson, Hertzberg, Stern, Wieckowski
NOES: Moorlach
NO VOTE RECORDED: Monning
SENATE APPROPRIATIONS COMMITTEE: 7-0, 8/16/18
AYES: Portantino, Bates, Beall, Bradford, Hill, Nielsen, Wiener
SUBJECT: California Environmental Quality Act: sports and entertainment project
DIGEST:
This bill establishes expedited administrative and judicial review procedures for the administrative and judicial review of the environmental impact report and approvals granted for a project related to the development of a specified sports and entertainment project in the City of Inglewood.
Existing law, under the California Environmental Quality Act (CEQA):
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration, mitigated declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines). (Public Resources Code (PRC) §21000 et seq.).
- Requires courts to give CEQA-related actions or proceedings preference over all other civil actions so that the action or proceeding is quickly heard and determined. (PRC §21167.1).
- Establishes, under the Jobs and Economic Improvement Through Environmental Leadership Act of 2011 (AB 900, Buchanan and Gordon, Chapter 354, Statutes of 2011) (AB 900), which is part of CEQA, CEQA administrative and judicial review procedures for an “environmental leadership development project.” (PRC §21178 et seq.).
- Establishes procedures for expedited judicial review (i.e., requiring the courts to resolve lawsuits within 270 days) for “environmental leadership” projects certified by the Governor and meeting specified conditions, including Leadership in Energy and Environmental Design (LEED) gold-certified infill site projects, clean renewable energy projects, and clean energy manufacturing projects.
- Defines “environmental leadership” project as a CEQA project.
- Authorizes the Governor to certify a leadership project if the Governor finds the project meets all of the specified conditions.
- Requires the Governor, prior to certifying a project, to make a determination that each of the conditions specified above has been met. These findings are not subject to judicial review.
- If the Governor determines that a leadership project is eligible for streamlining, requires the Governor to submit that determination, and any supporting information, to the Joint Legislative Budget Committee (JLBC) for review and concurrence or non-concurrence.
- Requires the JLBC to concur or non-concur in writing within 30 days of receiving the Governor’s determination.
- Deems the leadership project certified if the JLBC fails to concur or non-concur on a determination by the Governor within 30 days of the submittal.
- Authorizes the Governor to issue guidelines regarding application and certification of projects pursuant to AB 900. These guidelines are not subject to the rulemaking provisions of the Administrative Procedure Act.
- Requires the Judicial Council to adopt a rule of court to establish procedures that require resolution within 270 days, including any appeals, of a lawsuit challenging the certification of the EIR or any project approvals for a certified environmental leadership project.
- Prohibits AB 900 from applying to a leadership project if the applicant fails to notify a lead agency prior to the release of the draft EIR for public comment.
- Sets requirements for preparation and certification of the record of proceeding for a leadership project certified by the Governor.
- Requires the draft and final EIR to include a specified notice in no less than 12-point type regarding the draft and final EIR being subject to AB 900.
- Provides that provisions of AB 900 are severable.
- Provides that nothing in AB 900 affects the duty of any party to comply with CEQA, except as otherwise provided in AB 900.
- Prohibits AB 900 from applying to a leadership project if the Governor does not certify the project prior to January 1, 2020.
- Provides that certification of the leadership project expires and is no longer valid if the lead agency fails to approve the project prior to January 1, 2021.
This bill:
- Establishes specified administrative and judicial review procedures for the administrative and judicial review of the EIR and approvals granted for a project related to the development of a specified sports and entertainment project in the City of Inglewood meeting certain requirements.
- Defines “project” as a project located within the project area consisting of the arena plus practice and athletic training facility, and related parking and access, infrastructure construction or relocation, and landscaping, up to approximately 75,000 square feet of associated office space, up to approximately 30,000 square feet of sports medicine clinic space, up to approximately 70,000 square feet of ancillary retail, restaurant, community space, and similar uses, and a hotel, provided that the project meets all of the following:
- Receives Leadership in Energy and Environmental Design (LEED) gold certification for new construction within one year of the completion of the first NBA season.
- Requires a transportation demand management program that, upon full implementation, will achieve and maintain a 15-percent reduction in the number of vehicle trips, collectively, by attendees, employees, visitors, and customers as compared to operations absent the transportation demand program.
- Provides, to accelerate and maximize vehicle trip reduction, each measure in the transportation demand management program shall be implemented as soon as feasible, so that no less than a 7.5-percent reduction in vehicle trips is achieved and maintained by the end of the first NBA season during which an NBA team has played at the arena.
- A 15-percent reduction in vehicle trips shall be achieved and maintained as soon as feasible, but not later than January 1, 2030. The applicant shall verify achievement to the lead agency and the Office of Planning and Research.
- If the applicant fails to verify achievement of the reduction required, the lead agency shall impose additional feasible measures to reduce vehicle trips by 17 percent, or, if there is a rail transit line with a stop within one-quarter mile of the arena, 20 percent, by January 1, 2035.
- Defines “project area” means real property in the City of Inglewood consisting of approximately 35 acres, including without limitation areas generally described as follows:
- Assessor identification numbers 4032-001-005, 4032-001-006, 4032-001-033, 4032-001-035, 4032-001-039, 4032-001-048, 4032-001-049, 4032-001-900 to 4032-001-913, inclusive, 4032-002-913 to 4032-002-917, inclusive, 4032-003-912, 4032-003-914, 4032-003-915, 4032-004-913, 4032-004-914, 4032-007-035, 4032-007-900 to 4032-007-905, inclusive, 4032-008-001, 4032-008-002, 4032-008-006, 4032-008-034, 4032-008-035, 4032-008-900 to 4032-008-905, inclusive, 4032-008-907, 4032-008-908, 4034-004-026, 4034-004-900 to 4034-004-913, inclusive, and 4034-005-900 to 4034-005-912, inclusive.
- West 101st Street from its intersection with South Prairie Avenue westerly to a line approximately 488 feet west of the western boundary of South Prairie Avenue, and West 102nd Street from its intersection with South Prairie Avenue easterly to a line approximately 883 feet east of the eastern boundary of South Prairie Avenue.
- Adjacent areas or air space to be used for access.
- Is located on an infill site.
- Is consistent with the general use designation, density, building intensity, and applicable policies specified for the project area in either a sustainable communities strategy or an alternative planning strategy for which the State Air Resources Board, pursuant to subparagraph (H) of paragraph (2) of subdivision (b) of Section 65080 of the Government Code, has accepted a metropolitan planning organization’s determination that the sustainable communities strategy or the alternative planning strategy would, if implemented, achieve the greenhouse gas emission reduction targets.
- Provides that the Governor may certify the project for streamlining if specified conditions are met including:
- The project will result in a minimum investment of $100,000,000 in California upon completion of construction.
- The project creates high-wage, highly skilled jobs that pay prevailing wages and living wages.
- The project does not result in any net additional emission of greenhouse gases, as determined by the California Air Resources Board (ARB).
- Requires a project applicant to demonstrate compliance with the requirement that generators of commercial solid waste and large amounts of organic waste arrange for recycling services for those materials.
- The project applicant has entered into a binding and enforceable agreement that all mitigation measures required to certify the project shall be conditions of approval of the project.
- The project applicant agrees to pay for any additional costs occurred by the courts in any case brought pursuant to this section.
- The project applicant agrees to pay the costs of preparing the record of proceedings for the project concurrent with review and consideration of the project.
- Provides that as a condition of approval of the project, the lead agency shall require the applicant to implement measures that will meet the requirements of this division by the end of the first NBA regular season or June of the first NBA regular season, whichever is later.
- Provides that the lead agency shall require measures that will reduce the emissions of greenhouse gases in the project area and in the neighboring communities of the area.
- Specifies that not less than 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement shall be from local, direct greenhouse gas emissions reduction measures, as specified.
- Specifies that the applicant may obtain offset credits for up to 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement. The applicant shall, to the extent feasible, place the highest priority on the purchase of offset credits that produce emission reductions within the City of Inglewood or the boundaries of the South Coast Air Quality Management District. Any offset credits shall be verified by a third party accredited by the State Air Resources Board. Offset credits generated by a project shall not be located outside the United States.
- Provides that as a condition of approval of the project, the lead agency shall require the applicant, in consultation with the South Coast Air Quality Management District, to implement measures that will achieve criteria pollutant and toxic air contaminant reductions over and above any emission reductions required by other laws or regulations in communities surrounding the project consistent with emission reduction measures that may be identified for those communities pursuant to Section 44391.2 of the Health and Safety Code.
- At a minimum, these measures shall achieve reductions of a minimum of 400 tons of oxides of nitrogen and 10 tons of PM2.5, as defined in Section 39047.2 of the Health and Safety Code, over 10 years following the commencement of construction of the project. Of these amounts, reductions of a minimum of 130 tons of oxides of nitrogen and three tons of PM2.5 shall be achieved within the first year following commencement of construction of the project. The reductions required pursuant to this paragraph are in addition to any other requirements imposed by other laws.
- If the project applicant can demonstrate and verify to the South Coast Air Quality Management District that it has invested at least $30 million to achieve the requirements of this subdivision, the requirements of this subdivision shall be deemed met, so long as one-half of the reductions set forth in this bill are met.
- Greenhouse gas emissions reductions achieved pursuant to this subdivision shall count toward the applicant’s obligations under this bill.
- Provides that this bill does not apply to a project that proposes the construction of a new gambling establishment.
Background
Previous, Related Bills for Large Projects
- AB 900 and SB 292. AB 900 (Buchanan, Gordon, Chapter 354, Statutes of 2011) and SB 292 (Padilla, Chapter 353, Statutes of 2011) and AB 246 (Santiago, Chapter 354 ,Statutes of 2017) established expedited CEQA judicial review procedures for a limited number of projects. For AB 900, it was large-scale projects meeting extraordinary environmental standards and providing significant jobs and investment. For SB 292, it was a proposed downtown Los Angeles football stadium and convention center project achieving specified traffic and air quality mitigations. The stadium project subject to SB 292 has not proceeded.
For these eligible projects, the bills provided for original jurisdiction by the Court of Appeal and a compressed schedule requiring the court to render a decision on any lawsuit within 175 days. This promised to reduce the existing judicial review timeline by 100 days or more, while creating new burdens for the courts and litigants to meet the shortened schedule.
AB 900’s provision granting original jurisdiction to the Court of Appeal was invalidated in 2013 by a decision in Alameda Superior Court in Planning and Conservation League v. State of California.
- SB 743. Subsequent to the Alameda Superior Court holding mentioned above, SB 743 (Steinberg, Chapter 386, Statutes of 2013) repealed the provision that gave original jurisdiction to the Court of Appeal and required Judicial Council to adopt a rule of court mandating lawsuits and any appeals to be resolved within 270 days.
Also, SB 743 established special CEQA procedures modeled on SB 292 for the Sacramento Kings arena project. Like SB 292, SB 743 applied to a single project and included specified traffic and air quality mitigations. CEQA lawsuits were filed against the Kings arena, and the lawsuits, including appeals, were resolved 267 days after certification of the record.
Comments
- According to the author, “The Los Angeles Clippers NBA basketball team has expressed a desire to move to the City of Inglewood and construct a state of the art basketball arena adjacent to the new location for the NFL Los Angeles Rams Inglewood stadium, however this move requires that the new arena be available for the 2024 NBA season. AB 987 seeks to provide to the new Clippers area CEQA streamlining relief equivalent to what was granted to the new Sacramento Kings arena and the new Golden State Warriors arena in San Francisco. Under current law, construction projects may be delayed for years before breaking ground. This bill seeks to provide the same 270 day expedited judicial review which has been granted to other arena/stadium projects.”
- Litigation shot clock. This bill provides for expedited judicial review procedures under CEQA for a proposed project within the City of Inglewood.
- This bill does not guarantee all lawsuits on a project will be resolved within 270 days. Example: Golden State Warriors Arena and two lawsuits. One project subject to the AB 900 expedited judicial process is the Golden State Warriors Arena and related development at Mission Bay in San Francisco has been challenged under CEQA. One of the plaintiffs, Mission Bay Alliance, which is a coalition of University of California, San Francisco (UCSF) stakeholders, donors, faculty, and physicians, argued that the 18,500-seat arena would congest area streets with traffic, slowing down access to the UCSF Medical Center at Mission Bay, which is located across the street from the proposed arena. In addition, the plaintiff contended that the basketball arena in Mission Bay is at odds with the cluster of life science research and health care facilities that have been built in the neighborhood.
The case, Mission Bay Alliance et al. v Office of Community Investment and Infrastructure, was initially filed on January 7, 2016, in Sacramento County Superior Court. The Golden State Warriors moved for a change of venue and on February 3, 2016, the Sacramento Superior Court granted this request. On March 11, 2016, the CEQA case was received and filed in the San Francisco County Superior Court. On July 18, 2016, a trial court ruled in favor of the project sponsor, the Warriors. On November 29, 2016, the Court of Appeal issued its decision on the case, 327 days after the petition was initially filed. The decision was appealed; and ultimately, in January 2017, the California Supreme Court declined to hear the case.
In a second lawsuit, filed in Alameda County, the plaintiffs seek to invalidate an agreement between UCSF and the Warriors, which included a $10 million Mission Bay Transportation Improvement Fund for controlling traffic flow in the area. The plaintiffs contend that the UCSF Chancellor went beyond his authority in reaching this agreement without UC Regents approval. Although the CEQA case had concluded as of January, 2017, the second, non-CEQA-related case in Alameda was still pending at that time.
The Warriors team has stated that the lawsuits have delayed the opening of the arena by one year, to 2019. One lawsuit had special, fast-tracking CEQA-related litigation privileges and the other does not. Although AB 900 expedited the litigation process for the CEQA case, the second lawsuit demonstrates that CEQA is not the only body of law subject to civil litigation and that AB 900 does not guarantee a project from being litigation-free after 270 days. Rather, there is a cavalry of non-CEQA-related causes of action from which a plaintiff may choose and that are subject to standard civil procedure rules.
As demonstrated above, a special CEQA litigation process cannot expedite or insulate a project from non-CEQA-related litigation and cannot ensure that a project will be completed faster.
- Equal justice for all? Court calendar preference and guaranteed time frames. Current law requires the courts to give CEQA-related cases preference over “all other civil actions… so that the action or proceeding shall be quickly heard and determined.” (PRC §21167.1). In addition to this existing mandate, AB 987 provides that the courts must complete the judicial review process in a given time frame for certain CEQA-related actions or proceedings when specified criteria are met.
As a consequence, such mandates on a court delay access for other cases as well as potentially exacerbating a court’s backlog on civil documents such as filing a new civil complaint, processing answers and cross complaints, or processing a demurrer or summary judgment. As Judicial Council notes, “[S]etting an extremely tight timeline for deciding these cases has the practical effect of pushing other cases on the courts’ dockets to the back of the line. This means that other cases, including cases that have statutorily mandated calendar preferences, such as juvenile cases, criminal cases, and civil cases in which a party is at risk of dying, will take longer to decide.”
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
According to the Senate Appropriations Committee:
- $173,000 (various funds) for the ARB to analyze and certify that a project to build a sports arena and entertainment complex in Inglewood will not result in any net additional greenhouse gas emissions, including greenhouse gas emissions from employee transportation.
- Minor and absorbable costs for Judicial Council to review and revise the rules of the court to meet the requirements of this bill.
- Minor and absorbable costs for the Office of Planning and Research to process a judicial streamlining request.
3 Weaves Brewery
Al’s Powerwash, Inc.
Alianza Inglewood
Allstate Insurance
American Legion – Inglewood
Antojitos Martin
Carpenters Union
Children of Promise Schools
Corporate Coach Charter & Tours, INc.
Drobe Stogies
Faithful Central Bible Church
FAST SIGNS of Inglewood/ LAX
Fiesta Martin Bar and Grill
Fiesta Martin Mexican Grill
Fiesta Martin Tacos
Homelight Family Living Program
Inglewood Chief of Police Mark Fronterotta
Inglewood City Council
Inglewood Rotary
International Brotherhood of Electrical Workers 11
International Union of Elevator Constructors Local 18
JAMZ Creamery
Judy’s Income Tax
Keller Williams Realty Inglewood
La Sinaloense Bakery
Laborers Union Local 300
LAX Tacos
Los Angeles County Board of Supervisors
Los Angeles/Orange Counties Building and Construction Trades Councl
MiddleBar
Miracle Theater
NAACP, Inglewood South Bay Branch
One for All
Painters Union – Tradeshow and Sign Crafts Local Union 831
Sheet Metal Workers Local 105
SoCal Pipe Trades District Council 16
South Bay Cities Council of Government
True Vine Baptist Church
Western States Council of Sheet Metal Workers
Wise Tires & Brakes
WLM Financial
59 residents
OPPOSITION: (Verified 8/21/18)
Black Community, Clergy and Labor Alliance
Chrenshaw Subway Coalition
Inglewood Residents Against Takings and Evictions
Judicial Council of California
MSG Forum, LLC
New Frontier Democratic Club
Rodeway Inn and Suites
Sierra Club
Southern Christian Leandership Confernece
8/29/18 23:22:42
**** END ****
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB |
THIRD READING
Bill No: AB 987
:
PRIOR VOTES NOT RELEVANT
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 7-0, 6/20/18 (Pursuant to Senate Rule 29.10)
AYES: Wieckowski, Stone, Gaines, Hill, Lara, Skinner, Stern
SENATE JUDICIARY COMMITTEE: 5-1, 6/26/18
AYES: Jackson, Anderson, Hertzberg, Stern, Wieckowski
NOES: Moorlach
NO VOTE RECORDED: Monning
SENATE APPROPRIATIONS COMMITTEE: 7-0, 8/16/18
AYES: Portantino, Bates, Beall, Bradford, Hill, Nielsen, Wiener
DIGEST:
This bill establishes expedited administrative and judicial review procedures for the administrative and judicial review of the environmental impact report and approvals granted for a project related to the development of a specified sports and entertainment project in the City of Inglewood.
Existing law, under the California Environmental Quality Act (CEQA):
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration, mitigated declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines). (Public Resources Code (PRC) §21000 et seq.).
- Requires courts to give CEQA-related actions or proceedings preference over all other civil actions so that the action or proceeding is quickly heard and determined. (PRC §21167.1).
- Establishes, under the Jobs and Economic Improvement Through Environmental Leadership Act of 2011 (AB 900, Buchanan and Gordon, Chapter 354, Statutes of 2011) (AB 900), which is part of CEQA, CEQA administrative and judicial review procedures for an “environmental leadership development project.” (PRC §21178 et seq.).
- Establishes procedures for expedited judicial review (i.e., requiring the courts to resolve lawsuits within 270 days) for “environmental leadership” projects certified by the Governor and meeting specified conditions, including Leadership in Energy and Environmental Design (LEED) gold-certified infill site projects, clean renewable energy projects, and clean energy manufacturing projects.
- Defines “environmental leadership” project as a CEQA project.
- Authorizes the Governor to certify a leadership project if the Governor finds the project meets all of the specified conditions.
- Requires the Governor, prior to certifying a project, to make a determination that each of the conditions specified above has been met. These findings are not subject to judicial review.
- If the Governor determines that a leadership project is eligible for streamlining, requires the Governor to submit that determination, and any supporting information, to the Joint Legislative Budget Committee (JLBC) for review and concurrence or non-concurrence.
- Requires the JLBC to concur or non-concur in writing within 30 days of receiving the Governor’s determination.
- Deems the leadership project certified if the JLBC fails to concur or non-concur on a determination by the Governor within 30 days of the submittal.
- Authorizes the Governor to issue guidelines regarding application and certification of projects pursuant to AB 900. These guidelines are not subject to the rulemaking provisions of the Administrative Procedure Act.
- Requires the Judicial Council to adopt a rule of court to establish procedures that require resolution within 270 days, including any appeals, of a lawsuit challenging the certification of the EIR or any project approvals for a certified environmental leadership project.
- Prohibits AB 900 from applying to a leadership project if the applicant fails to notify a lead agency prior to the release of the draft EIR for public comment.
- Sets requirements for preparation and certification of the record of proceeding for a leadership project certified by the Governor.
- Requires the draft and final EIR to include a specified notice in no less than 12-point type regarding the draft and final EIR being subject to AB 900.
- Provides that provisions of AB 900 are severable.
- Provides that nothing in AB 900 affects the duty of any party to comply with CEQA, except as otherwise provided in AB 900.
- Prohibits AB 900 from applying to a leadership project if the Governor does not certify the project prior to January 1, 2020.
- Provides that certification of the leadership project expires and is no longer valid if the lead agency fails to approve the project prior to January 1, 2021.
This bill establishes expedited administrative and judicial review procedures for the administrative and judicial review of the EIR and approvals granted for a project related to the development of a specified sports and entertainment project in the City of Inglewood.
Background
Previous, Related Bills for Large Projects
- AB 900 and SB 292. AB 900 (Buchanan, Gordon, Chapter 354, Statutes of 2011) and SB 292 (Padilla, Chapter 353, Statutes of 2011) and AB 246 (Santiago, Chapter 354 ,Statutes of 2017) established expedited CEQA judicial review procedures for a limited number of projects. For AB 900, it was large-scale projects meeting extraordinary environmental standards and providing significant jobs and investment. For SB 292, it was a proposed downtown Los Angeles football stadium and convention center project achieving specified traffic and air quality mitigations. The stadium project subject to SB 292 has not proceeded.
For these eligible projects, the bills provided for original jurisdiction by the Court of Appeal and a compressed schedule requiring the court to render a decision on any lawsuit within 175 days. This promised to reduce the existing judicial review timeline by 100 days or more, while creating new burdens for the courts and litigants to meet the shortened schedule.
AB 900’s provision granting original jurisdiction to the Court of Appeal was invalidated in 2013 by a decision in Alameda Superior Court in Planning and Conservation League v. State of California.
- SB 743. Subsequent to the Alameda Superior Court holding mentioned above, SB 743 (Steinberg, Chapter 386, Statutes of 2013) repealed the provision that gave original jurisdiction to the Court of Appeal and required Judicial Council to adopt a rule of court mandating lawsuits and any appeals to be resolved within 270 days.
Also, SB 743 established special CEQA procedures modeled on SB 292 for the Sacramento Kings arena project. Like SB 292, SB 743 applied to a single project and included specified traffic and air quality mitigations. CEQA lawsuits were filed against the Kings arena, and the lawsuits, including appeals, were resolved 267 days after certification of the record.
Comments
- According to the author, “The Los Angeles Clippers NBA basketball team has expressed a desire to move to the City of Inglewood and construct a state of the art basketball arena adjacent to the new location for the NFL Los Angeles Rams Inglewood stadium, however this move requires that the new arena be available for the 2024 NBA season. AB 987 seeks to provide to the new Clippers area CEQA streamlining relief equivalent to what was granted to the new Sacramento Kings arena and the new Golden State Warriors arena in San Francisco. Under current law, construction projects may be delayed for years before breaking ground. This bill seeks to provide the same 270 day expedited judicial review which has been granted to other arena/stadium projects.”
- What is the need for the rush? The LA Clippers have a lease to play at Staples Center in downtown Los Angeles through 2024. They have over six years to plan and construct the arena and the LA Clippers will continue to play at the Staples Center in the meantime. In addition, what is known about the proposed arena seems more like a general idea of a project – there are no public site plans or renderings; the only specifics made publicly available are that it will be privately financed, seat 18,000 to 20,000 people, will include parking, a practice facility, and team offices; the City of Inglewood is in the middle of formal negotiations with the Clippers over the facility.
In addition, as noted above, the City of Inglewood has entered into a three-year ENA with Murphy’s Bowl LLC for purposes related to the proposed project site, which includes parcels owned by third parties.
Considering the ample amount of time before the arena is scheduled to open in 2024 to conduct environmental reviews, obtain necessary permits, and construct the projects, the Legislature may wish to consider the need for this bill.
- Litigation shot clock. This bill provides for expedited judicial review procedures under CEQA for a proposed project within the City of Inglewood.
- This bill does not guarantee all lawsuits on a project will be resolved within 270 days. Example: Golden State Warriors Arena and two lawsuits. One project subject to the AB 900 expedited judicial process is the Golden State Warriors Arena and related development at Mission Bay in San Francisco has been challenged under CEQA. One of the plaintiffs, Mission Bay Alliance, which is a coalition of University of California, San Francisco (UCSF) stakeholders, donors, faculty, and physicians, argued that the 18,500-seat arena would congest area streets with traffic, slowing down access to the UCSF Medical Center at Mission Bay, which is located across the street from the proposed arena. In addition, the plaintiff contended that the basketball arena in Mission Bay is at odds with the cluster of life science research and health care facilities that have been built in the neighborhood.
The case, Mission Bay Alliance et al. v Office of Community Investment and Infrastructure, was initially filed on January 7, 2016, in Sacramento County Superior Court. The Golden State Warriors moved for a change of venue and on February 3, 2016, the Sacramento Superior Court granted this request. On March 11, 2016, the CEQA case was received and filed in the San Francisco County Superior Court. On July 18, 2016, a trial court ruled in favor of the project sponsor, the Warriors. On November 29, 2016, the Court of Appeal issued its decision on the case, 327 days after the petition was initially filed. The decision was appealed; and ultimately, in January 2017, the California Supreme Court declined to hear the case.
In a second lawsuit, filed in Alameda County, the plaintiffs seek to invalidate an agreement between UCSF and the Warriors, which included a $10 million Mission Bay Transportation Improvement Fund for controlling traffic flow in the area. The plaintiffs contend that the UCSF Chancellor went beyond his authority in reaching this agreement without UC Regents approval. Although the CEQA case had concluded as of January, 2017, the second, non-CEQA-related case in Alameda was still pending at that time.
The Warriors team has stated that the lawsuits have delayed the opening of the arena by one year, to 2019. One lawsuit had special, fast-tracking CEQA-related litigation privileges and the other does not. Although AB 900 expedited the litigation process for the CEQA case, the second lawsuit demonstrates that CEQA is not the only body of law subject to civil litigation and that AB 900 does not guarantee a project from being litigation-free after 270 days. Rather, there is a cavalry of non-CEQA-related causes of action from which a plaintiff may choose and that are subject to standard civil procedure rules.
As demonstrated above, a special CEQA litigation process cannot expedite or insulate a project from non-CEQA-related litigation and cannot ensure that a project will be completed faster.
- Equal justice for all? Court calendar preference and guaranteed time frames. Current law requires the courts to give CEQA-related cases preference over “all other civil actions… so that the action or proceeding shall be quickly heard and determined.” (PRC §21167.1). In addition to this existing mandate, AB 987 provides that the courts must complete the judicial review process in a given time frame for certain CEQA-related actions or proceedings when specified criteria are met.
As a consequence, such mandates on a court delay access for other cases as well as potentially exacerbating a court’s backlog on civil documents such as filing a new civil complaint, processing answers and cross complaints, or processing a demurrer or summary judgment. As Judicial Council notes, “[S]etting an extremely tight timeline for deciding these cases has the practical effect of pushing other cases on the courts’ dockets to the back of the line. This means that other cases, including cases that have statutorily mandated calendar preferences, such as juvenile cases, criminal cases, and civil cases in which a party is at risk of dying, will take longer to decide.”
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
According to the Senate Appropriations Committee:
- $173,000 (various funds) for the California Air Resources Board to analyze and certify that a project to build a sports arena and entertainment complex in Inglewood will not result in any net additional greenhouse gas emissions, including greenhouse gas emissions from employee transportation.
- Minor and absorbable costs for Judicial Council to review and revise the rules of the court to meet the requirements of this bill.
- Minor and absorbable costs for the Office of Planning and Research to process a judicial streamlining request.
3 Weaves Brewery
Al’s Powerwash, Inc.
Alianza Inglewood
Allstate Insurance
American Legion – Inglewood
Antojitos Martin
Carpenters Union
Children of Promise Schools
Corporate Coach Charter & Tours, INc.
Drobe Stogies
Faithful Central Bible Church
FAST SIGNS of Inglewood/ LAX
Fiesta Martin Bar and Grill
Fiesta Martin Mexican Grill
Fiesta Martin Tacos
Homelight Family Living Program
Inglewood Chief of Police Mark Fronterotta
Inglewood City Council
Inglewood Rotary
International Brotherhood of Electrical Workers 11
International Union of Elevator Constructors Local 18
JAMZ Creamery
Judy’s Income Tax
Keller Williams Realty Inglewood
La Sinaloense Bakery
Laborers Union Local 300
LAX Tacos
Los Angeles County Board of Supervisors
Los Angeles/Orange Counties Building and Construction Trades Councl
MiddleBar
Miracle Theater
NAACP, Inglewood South Bay Branch
One for All
Painters Union – Tradeshow and Sign Crafts Local Union 831
Sheet Metal Workers Local 105
SoCal Pipe Trades District Council 16
South Bay Cities Council of Government
True Vine Baptist Church
Western States Council of Sheet Metal Workers
Wise Tires & Brakes
WLM Financial
59 residents
OPPOSITION: (Verified 8/21/18)
Black Community, Clergy and Labor Alliance
Chrenshaw Subway Coalition
Inglewood Residents Against Takings and Evictions
Judicial Council of California
MSG Forum, LLC
New Frontier Democratic Club
Rodeway Inn and Suites
Sierra Club
Southern Christian Leandership Confernece
8/21/18 18:55:47
**** END ****
SENATE COMMITTEE ON APPROPRIATIONS
Senator Anthony Portantino, Chair
2017 - 2018 Regular Session
AB 987 (Kamlager-Dove) – California Environmental Quality Act: sports and entertainment project
Version: July 3, 2018 | Policy Vote: G.O. 10 - 0, E.Q. 7 - 0, JUD. 5 - 1 |
Urgency: No | Mandate: Yes |
Hearing Date: August 16, 2018 | Consultant: Ashley Ames |
Bill Summary:
This bill would establish expedited administrative and judicial review procedures for the administrative and judicial review of the environmental impact report and approvals granted for a project related to the development of a specified sports and entertainment project in the City of Inglewood.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on August 16, 2018
Fiscal Impact:
- $173,000 (various funds) for the California Air Resources Board (CARB) to analyze and certify that a project to build a sports arena and entertainment complex in Inglewood will not result in any net additional greenhouse gas emissions, including greenhouse gas emissions from employee transportation.
- Minor and absorbable costs for Judicial Council to review and revise the rules of the court to meet the requirements of this bill.
- Minor and absorbable costs for the Office of Planning and Research to process a judicial streamlining request.
Committee Amendments:
Clarify the scope of the project, define “pending litigation”, and make technical changes.
-- END --
SENATE COMMITTEE ON APPROPRIATIONS
Senator Anthony Portantino, Chair
2017 - 2018 Regular Session
AB 987 (Kamlager-Dove) - California Environmental Quality Act: sports and entertainment project
Version: July 3, 2018 | Policy Vote: G.O. 10 - 0, E.Q. 7 - 0, JUD. 5 - 1 |
Urgency: No | Mandate: Yes |
Hearing Date: August 13, 2018 | Consultant: Ashley Ames |
This bill meets the criteria for referral to the Suspense File.
Bill Summary:
This bill would establish expedited administrative and judicial review procedures for the administrative and judicial review of the environmental impact report and approvals granted for a project related to the development of a specified sports and entertainment project in the City of Inglewood.
Fiscal Impact:
- $173,000 (various funds) for the California Air Resources Board (CARB) to analyze and certify that a project to build a sports arena and entertainment complex in Inglewood will not result in any net additional greenhouse gas emissions, including greenhouse gas emissions from employee transportation.
- Minor and absorbable costs for Judicial Council to review and revise the rules of the court to meet the requirements of this bill.
- Minor and absorbable costs for the Office of Planning and Research to process a judicial streamlining request.
Background:
The California Environmental Quality Act (CEQA) requires state and local agencies to follow a set protocol in order to disclose and evaluate any significant environmental impacts associated with proposed projects and to adopt feasible measures to mitigate those impacts. Projects determined to have significant environmental impacts generally are required to create an Environmental Impact Report (EIR). The EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. To enforce the requirements of CEQA, a civil action may be brought under several code sections to attack, review, set aside, void, or annul the acts or decisions of a public agency for noncompliance.
Existing law provides a framework for expediting CEQA review of major projects. AB 900 (Buchanan, Ch. 354, Stats. 2011) established specified administrative and judicial review procedures for the review of the EIR and public agency approvals granted for designated residential, retail, commercial, sports, cultural, entertainment, or recreational use projects, or clean renewable energy or clean energy manufacturing projects. To qualify as a leadership project, the project must:
- exceed a cost of $100 million and not result in any net additional emissions of greenhouse gases;
- create high-wage, highly skilled jobs that pay prevailing and living wages and provide construction jobs and permanent jobs for Californians; and
- be subject to an agreement with the lead agency that all mitigation measures will be enforced and monitored.
Additionally, the applicant bears the burden of costs for any hearing or decision before the Court of Appeal. The Governor has the discretion to certify the project. If the Governor does so, the application is submitted to the Joint Legislative Budget Committee for its concurrence.
Proposed Law:
This bill would establish expedited administrative and judicial review procedures for the administrative and judicial review of the environmental impact report and approvals granted for a project related to the development of a specified sports and entertainment project in the City of Inglewood. Specifically, this bill would authorize the Governor to certify a specified sports and entertainment project located in the City of Inglewood for streamlining if the project meets certain requirements. The bill would apply certain rules of court establishing procedures requiring actions or proceedings seeking judicial review pursuant to CEQA or the granting of project approvals to be resolved within 270 days of the filing of the certified record of proceedings with the court to an action or proceeding seeking judicial review of the lead agency’s action related to the certified project.
Related Legislation:
- AB 734 (Bonta, 2018) would establish procedures specific the Oakland Sports and Mixed-Use Project in the City of Oakland that would provide expedited administrative and judicial review procedures.
- AB 2267 (Wood, 2018) would exempt the City of Santa Rosa from CEQA until January 1, 2024, with regard to the adoption or approval of amendments to land use plans that meet certain requirements. The bill would also authorize streamlined judicial review for the adoption or amendment of a specific plan, general plan, zoning ordinance, or other planning document by a local public agency for purposes related to promoting housing development and infill.
- AB 3030 (Caballero, 2018) would exempt from CEQA a project that is financed by a qualified opportunity fund and that meets the certain requirements.
Staff Comments:
It makes sense to consider this bill in the context of several CEQA-related bills currently before this committee. There are several CEQA-related bills currently before this committee that staff recommends evaluating as a comprehensive package rather than on an individual basis. First, it makes sense for the committee to apply a uniform approach to all of the CEQA-related bills that it is considering. Second, these bills would require resources from the same program areas of the same departments. While the impact of each bill individually might be absorbable, some or all of the bills implemented collectively could result in significant cost pressure and a need for additional resources.
Project-Specific Processes Require Additional Department Resources. Regulations, necessary staff, and needed resources already exist for the typical CEQA process as well as alternatives that are codified, such as AB 900. However, bills that define new processes for individual projects create new workload for departments since the existing framework no longer applies to them.
Exemptions and Alternative Processes Could Reduce Protections Offered by CEQA. CEQA was enacted in order to offer specific environmental protections to both Californians and the California environment. Some projects, especially large-scale ones, can experience significant delays under the current CEQA process. Providing an exemption or alternative to some projects can make sense in certain circumstances when the overall public benefit of the project is clear. However, when that is the case, staff recommends ensuring that a similar level of environmental protection is required.
-- END --
Senator Hannah-Beth Jackson, Chair
2017-2018 Regular Session
Bill No: AB 987 (Author:Kamlager-Dove)
Version: June 7, 2018
Hearing Date: June 26, 2018
Fiscal: Yes
Urgency: No
Consultant: JDT
SUBJECT
California Environmental Quality Act: sports and entertainment project
DESCRIPTION
This bill would establish expedited administrative and judicial review procedures for the administrative and judicial review of the environmental impact report and approvals granted for a project related to the development of a specified sports and entertainment project in the City of Inglewood.
This analysis reflects amendments previously agreed to in the Senate Environmental Quality Committee, but that are not in the print version of the bill. These amendments are described in Comment 2.
BACKGROUND
Enacted in 1970, the California Environmental Quality Act (CEQA) requires state and local agencies (public agencies) to follow a set protocol to disclose and evaluate the significant environmental impacts of proposed projects and to adopt feasible measures to mitigate those impacts. CEQA itself applies to “projects” undertaken or requiring approval by public agencies, and, if more than one agency is involved, CEQA requires one of the agencies to be designated as the “lead agency.” The environmental review process required by CEQA consists of: (1) determining if the activity is a project; (2) determining if the project is exempt from CEQA; and (3) performing an initial study to identify the environmental impacts and, depending on the findings, prepare either a Negative Declaration (for projects with no significant impacts), a Mitigated Negative Declaration (for projects with significant impacts but that are revised in some form to avoid or mitigate those impacts), or an Environmental Impact Report (for projects with significant impacts).
An Environmental Impact Report (EIR) must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Before approving any project that has received environmental review, an agency must make certain findings pertaining to the project’s environmental impact and any associated mitigation measures. If mitigation measures are required or incorporated into a project, the public agency must adopt a reporting or monitoring program to ensure compliance with those measures. To enforce the requirements of CEQA, a civil action may be brought under several code sections to attack, review, set aside, void, or annul the acts or decisions of a public agency for noncompliance with the act.
Existing law provides a framework for expediting CEQA review of major projects. AB 900 (Buchanan, Ch. 354, Stats. 2011), the Jobs and Economic Improvement Through Environmental Leadership Act of 2011, established specified administrative and judicial review procedures for the review of the EIR and public agency approvals granted for designated residential, retail, commercial, sports, cultural, entertainment, or recreational use projects, or clean renewable energy or clean energy manufacturing projects. To qualify as a leadership project, the project must:
- exceed $100 million and not result in any net additional emissions of greenhouse gases;
- create high-wage, highly skilled jobs that pay prevailing and living wages and provide construction jobs and permanent jobs for Californians; and
- be subject to an agreement with the lead agency that all mitigation measures will be enforced and monitored.
Additionally, the applicant bears the burden of costs for any hearing or decision before the Court of Appeal. The Governor has the discretion to certify the project. If the Governor does so, the application is submitted to the Joint Legislative Budget Committee for its concurrence.
This bill would establish separate expedited administrative and judicial review procedures for the administrative and judicial review of the EIR and approvals granted for a project related to the development of a specified sports and entertainment project in the City of Inglewood.
This bill was previously heard in the Senate Environmental Quality Committee, and passed by a vote of 7-0. This analysis reflects amendments that were agreed to in that committee, but that are not in the print version of the bill. These amendments are described in Comment 2.
CHANGES TO EXISTING LAW
Existing law, the California Environmental Quality Act (CEQA), requires a public agency to prepare, or cause to be prepared, and to certify the completion of, an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. (Pub. Res. Code Sec. 21100 et seq.)
Existing law defines “project” as an activity that may cause either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, and which is any of the following:
- an activity directly undertaken by any public agency;
- an activity undertaken by a person which is supported, in whole or in part, through contracts, grants, subsidies, loans, or other forms of assistance from one or more public agencies; or
- an activity that involves the issuance to a person of a lease, permit, license, certificate, or other entitlement for use by one or more public agencies. (Pub. Res. Code Sec. 21065.)
Existing law provides that an action or proceeding to attack, review, set aside, void, or annul the acts or decisions of a public agency on the grounds of noncompliance with CEQA may be commenced when, among other things, it is alleged that:
- a public agency is carrying out or has approved a project that may have a significant effect on the environment without having determined whether the project may have a significant effect on the environment;
- a public agency has improperly determined whether a project may have a significant effect on the environment;
- an environmental impact report prepared by, or caused to be prepared by, a public agency does not comply with CEQA;
- a public agency has improperly determined that a project is not subject to CEQA; or
- another act or omission of a public agency does not comply with CEQA. (Pub. Res. Code Sec. 21167.)
Existing law requires a plaintiff or petitioner to file a request that the respondent public agency prepare the record of proceedings relating to the underlying subject of the action or proceeding to attack, review, set aside, void, or annul its acts or decisions on the grounds of noncompliance with CEQA. Such a request must be served personally within 10 business days from the filing of the action or proceeding. The public agency is then required to prepare a record of proceedings relating to the subject of the action or proceeding. The public agency’s record of proceedings shall include, among other things, any transcript or minutes of the proceedings at which the decisionmaking body of the public agency heard testimony on, or considered any environmental document on, the project, and any transcript or minutes of proceedings before any advisory body to the public agency that were presented to the decisionmaking body prior to action on the environmental documents or on the project. (Pub. Res. Code Sec. 21167.6.)
Existing law states that an action or proceeding to attack, review, set aside, void, or annul the acts or decisions of a public agency on the grounds of noncompliance with CEQA shall not be brought unless the alleged grounds for noncompliance were presented to the public agency orally or in writing by any person during the public comment period provided by CEQA or prior to the close of the public hearing on the project before the issuance of the notice of determination. (Pub. Res. Code Sec. 21177(a).)
Existing law states that a person shall not maintain an action or proceeding to attack, review, set aside, void, or annul the acts or decisions of a public agency on the grounds of noncompliance with CEQA unless that person objected to the approval of the project orally or in writing during the public comment period provided by CEQA or prior to the close of the public hearing on the project before the filing of the notice of determination. (Pub. Res. Code Sec. 21177(b).)
Existing law does not preclude any organization formed after the approval of a project from maintaining an action or proceeding to attack, review, set aside, void, or annul the acts or decisions of a public agency on the grounds of noncompliance with CEQA if a member of that organization has complied with the above two provisions. Existing law provides that the grounds for noncompliance may have been presented directly by a member or by a member agreeing with or supporting the comments of another person. (Pub. Res. Code Sec. 21177(c).)
Existing law provides that if a parcel has been zoned to accommodate a particular density of development or has been designated in a community plan to accommodate a particular density of development and an environmental impact report was certified for that zoning or planning action, the application of CEQA to the approval of any subdivision map or other project that is consistent with the zoning or community plan shall be limited to effects upon the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new information shows will be more significant than described in the prior environmental impact report. (Pub. Resources Code Sec. 21083.3(a).)
Existing law provides that if a development project is consistent with the general plan of a local agency and an environmental impact report was certified with respect to that general plan, the application of CEQA to the approval of that development project shall be limited to effects on the environment which are peculiar to the parcel or to the project and which were not addressed as significant effects in the prior environmental impact report, or which substantial new information shows will be more significant than described in the prior environmental impact report. (Pub. Res. Code Sec. 21083.3(b).)
Existing law, the Jobs and Economic Improvement Through Environmental Leadership Act of 2011 (AB 900, Buchanan, Gordon, Chapter 354, Statutes of 2011) (AB 900), which is part of CEQA, establishes CEQA administrative and judicial review procedures for an “environmental leadership development project.” (Pub. Res. Code Sec. 21178 et seq.).
Existing law, with regard to environmental leadership development projects, establishes procedures for expedited judicial review—specifically, courts must resolve lawsuits within 270 days—if the projects are certified by the Governor and meet specified conditions. (Pub. Res. Code Secs. 21178 & 21185.)
Existing law defines “environmental leadership development project” as a CEQA project that is one of the following:
- residential, retail, commercial, sports, cultural, entertainment, or recreational use project that is certified as LEED gold or better by the United States Green Building Council and, where applicable, that achieves a 15 percent or greater standard for transportation efficiency than for comparable projects, and that is located on an infill site, as prescribed;
- a clean renewable energy project that generates electricity exclusively through wind or solar, but not including waste incineration or conversion; or
- a clean energy manufacturing project that manufactures products, equipment, or components used for renewable energy generation, energy efficiency, or for the production of clean alternative fuel vehicles. (Pub. Res. Code Sec. 21180(b).)
Existing law allows a person proposing to construct a leadership project to apply to the Governor for certification that the leadership project is eligible for streamlining. Existing law requires the person to supply evidence and materials that the Governor deems necessary to make a decision on the application. Existing law also requires any evidence or materials be made available to the public at least 15 days before the Governor certifies a project pursuant to AB 900. (Pub. Res. Code Sec. 21182.)
Existing law allows the Governor to certify a leadership project if the Governor finds the project meets all of the following conditions:
- the project will result in a minimum investment of $100 million in California upon completion of construction;
- the project creates high-wage, highly skilled jobs that pay prevailing wages and living wages, provides construction jobs and permanent jobs for Californians, and helps reduce unemployment;
- the project does not result in any net additional GHG emissions, including emissions from employee transportation, as determined by the Air Resources Board pursuant to the California Global Warming Solutions Act of 2006;
- the project applicant has entered into a binding and enforceable agreement that all mitigation measures required under CEQA shall be conditions of approval of the project, and those conditions will be fully enforceable by the lead agency or another agency designated by the lead agency;
- the project applicant agrees to pay the costs of the Court of Appeal in hearing and deciding any case, including payment of the costs for the appointment of a special master if deemed appropriate by the court, in a form and manner specified by the Judicial Council; and
- the project applicant agrees to pay the costs of preparing the administrative record for the project concurrent with review and consideration of the project pursuant to CEQA, in a form and manner specified by the lead agency for the project. (Pub. Res. Code Sec. 21183.)
Existing law requires the Governor, upon determining that a leadership project is eligible for streamlining, to submit that determination, and any supporting information, to the Joint Legislative Budget Committee for review and concurrence or non-concurrence. (Pub. Res. Code Sec. 21184(a)-(c).)
Existing law authorizes the Governor to issue guidelines regarding application and certification of projects pursuant to AB 900. These guidelines are not subject to the rulemaking provisions of the Administrative Procedure Act. (Pub. Res. Code Sec. 21184(d).)
Existing law requires the Judicial Council to adopt a rule of court to establish procedures that require resolution within 270 days, including any appeals, of a lawsuit challenging the certification of the EIR or any project approvals for a certified environmental leadership project. (Pub. Res. Code Sec. 21185.)
Existing law establishes requirements for preparation and certification of the record of proceeding for a leadership project certified by the Governor. (Pub. Res. Code Sec. 21186.)
Existing law provides that nothing in AB 900 affects the duty of any party to comply with CEQA, except as otherwise provided in AB 900. (Pub. Res. Code Sec. 21189.)
Existing law provides that AB 900 does not apply to a leadership project if the Governor does not certify the project prior to January 1, 2020. (Pub. Res. Code Sec. 21181.)
Existing law provides that certification of the leadership project expires and is no longer valid if the lead agency fails to approve the project prior to January 1, 2021. (Pub. Res. Code Sec. 21189.1.)
This bill would establish expedited administrative and judicial review procedures for the administrative and judicial review of the EIR and approvals granted for a project related to the development of a specified sports and entertainment project in the City of Inglewood.
This bill would define “project” as either:
- an arena plus practice and athletic training facility, and related parking infrastructure construction or relocation, and landscaping, up to approximately 75,000 square feet of associated office space, up to approximately 30,000 square feet of sports medicine clinic space, up to 55,000 square feet of ancillary retail, restaurant, community space, and similar uses, and a hotel, provided that the arena:
- within one year of the completion of the first NBA season in the arena, receives a Leadership in Energy and Environmental Design (LEED) gold certification, or its equivalent;
- achieves, through either project design, including those design features implemented for LEED gold certification, or the implementation of feasible mitigation measures, or both design features and mitigation measures, a reduction in the arena’s operational emissions of greenhouse gases, as defined, of no less than 20 percent as compared to the operational emissions that would otherwise result from an arena built in compliance with applicable building codes in the absence of the project design features or mitigation measures that are not required under the applicable building codes; or
- approvals related to land uses that are consistent with the general plan of Inglewood, existing as of January 1, 2019.
This bill would provide that the California Rules of Court applicable to other CEQA projects with expedited review apply to any challenge against the certification of an EIR for the project or granting of any project approvals, in order to require the actions or proceeding, including any appeals, to be resolved, to the extent feasible, within 270 days of the certification of the record of proceedings, as specified. The bill would require, on or before July 1, 2019, the Judicial Council to amend the California Rules of Court for these purposes.
This bill would provide that, for an EIR for a project under this statute, the lead agency need not consider comments filed after the close of the public comment period for the draft EIR and any judicial action challenging the certification of the EIR is subject to the specified procedures and limitations.
This bill would provide that, within 5 days after the close of the comment period, a commenter may request nonbinding mediation with the lead agency. Mediation must be completed within 35 days of the close of the comment period. The lead agency must adopt agreed upon measures, and a commenter cannot use that issue as a basis to challenge the certification of the environmental review document or project approval.
This bill would provide that decisions of the lead agency regarding analyses and impacts relating to greenhouse gas emissions and vehicle miles traveled, are, as a matter of law, not an abuse of discretion if certain conditions are met.
This bill would provide that, as a condition of approval of the project subject to the bill’s provision, the lead agency must require the applicant, with respect to any measures specific to the operation of the arena, to implement those measures that will meet the requirements of this division by the end of the first NBA regular season or June of the first NBA regular season, whichever is later, during which an NBA team has played at the arena.
This bill would provide that the court may only enjoin specific activities associated with the project that present an imminent threat to public health and safety or that materially, permanently, or that adversely affect unforeseen important Native American artifacts or unforeseen important historical, archaeological, or ecological values, as specified.
COMMENT
1. Stated need for the bill
The author writes:
The Los Angeles Clippers NBA basketball team has expressed a desire to move to the City of Inglewood and construct a state of the art basketball arena adjacent to the new location for the NFL Los Angeles Rams Inglewood stadium, however this move requires that the new arena be available for the 2024 NBA season. AB 987 seeks to provide to the new Clippers area CEQA streamlining relief equivalent to what was granted to the new Sacramento Kings arena and the new Golden State Warriors arena in San Francisco. Under current law, construction projects may be delayed for years before breaking ground. This bill seeks to provide the same 270 day expedited judicial review which has been granted to other arena/stadium projects.
2. Amendments taken in the Senate Environmental Quality Committee
This bill was previously heard in the Senate Environmental Quality Committee, and passed by a vote of 7-0. During the hearing, several amendments were agreed to as a condition of the bill’s passage. Due to time constraints, these amendments have not yet been adopted into the print version of the bill. Following that hearing, staff from the Senate Environmental Quality Committee emailed a description of the amendments to this Committee’s staff. That description, reproduced verbatim and in its entirety, is as follows:
A commitment was made in the Senate Committee on Environmental Quality to amend AB 987 (Kamlager-Dove) in the judiciary committee to limit the scope of the project, strengthen the provisions of access through CEQA and provide greater clarity of the criteria used to establish eligibility of the project under this statute. Specifically the agreed upon amendments are as follows:
- Limit the definition of project to the approximately 30 acres that encompasses the arena, health clinic, office space, practice facility, outdoor basketball facility, parking, 6 acres of open space and arena auxiliary spaces as specified by parcel number.
- Require the project achieve at least LEED Gold rating within one year of the completion of the first NBA season.
- Requires a transportation management plan or transportation demand management program, or both, that achieves a 15 percent reduction in the number of per capita vehicle trips by attendees, employees, visitors, and customers as compared to operations of the Arena absent the transportation management plan or transportation demand management program by 2030.
- Specify that the project shall achieve net zero greenhouse gas emissions and any mitigation measures shall be achieved locally based on baseline of games played by the Clippers at the Staples center as determined and enforced by the State Air Resources Board.
- Provide that this project is subject to project labor agreements.
- Remove language consideration and response to comments on the EIR submitted to the lead agency after the close of the public comment period.
- Provide that the State Air Resources Board shall approve the methodology and analysis and threshold of significance used in the analysis of greenhouse gas emission impacts and vehicle miles traveled (VMT).
- Removes language that states that the analysis of greenhouse gas emissions and VMT shall not be grounds for relief.
- Remove language that prevents the court from staying or enjoin the construction or operation of the project.
- Provides that the lead agency shall mandate feasible measures that will reduce the emissions of greenhouse gases in the project area.
- Specifies that the provisions of this legislation to not apply to a new gaming establishment.
- Adds a repeal date of this statute of January 1, 2025, if the lead agency has failed to certify an EIR for the specified project.
This analysis is based on AB 987 as it would be changed by those amendments.
3. Unclear definition of “project”
This bill would define “project” as either:
- an arena plus practice and athletic training facility, and related parking infrastructure construction or relocation, and landscaping, up to approximately 75,000 square feet of associated office space, up to approximately 30,000 square feet of sports medicine clinic space, up to 55,000 square feet of ancillary retail, restaurant, community space, and similar uses, and a hotel, provided that the arena meets both of the following:
- within one year of the completion of the first NBA season in the arena, receives a Leadership in Energy and Environmental Design (LEED) gold certification, or its equivalent;
- achieves, through either project design, including those design features implemented for LEED gold certification, or the implementation of feasible mitigation measures, or both design features and mitigation measures, a reduction in the arena’s operational emissions of greenhouse gases, as defined, of no less than 20 percent as compared to the operational emissions that would otherwise result from an arena built in compliance with applicable building codes in the absence of the project design features or mitigation measures that are not required under the applicable building codes; or
- approvals related to land uses that are consistent with the general plan of Inglewood, existing as January 1, 2019.
“Approvals related to land uses that are consistent with the general plan of Inglewood, existing as of January 1, 2019” falls short of a clear set of parameters for the project, and provides scant guidance for a project of such significance. Furthermore, this provision arguably delegates to the City of Inglewood the power to make fundamental policy decisions that more appropriately should be decided by the Legislature.
Writing in opposition, MSG Forum LLC states:
The project is a complete unknown. AB 987 would allow any project consistent with a future and currently unknown version of Inglewood’s general plan across 360 acres (stated in the proposed legislation to be a square mile area) to avoid any meaningful environmental review. These 360 acres include the 59-acre site of the purported Clippers’ arena and a nearly 300 acre site within the Hollywood Park Specific Plan area, which is already the subject of a voter approved initiative. Under AB 987, so long as a project is consistent with a future and currently unknown adopted general plan, it can receive all the benefits sought. This means a regional shopping center, big box retail, millions of square feet of office or anything else could effectively be exempted from CEQA review even if an arena is never built. If the City of Inglewood cannot even tell you the scope of the development subject to this legislation, how can the Clippers and the City expect the Legislature to pass AB 987?
4. Major sports venues and CEQA
- Sports venues that were subjected to full CEQA review
Since the establishment of CEQA over 45 years ago, several sports venues have been proposed or built in California. A number of major league sports venues have been built and fully complied with CEQA, including:
- Avaya Stadium, Santa Clara (Opened in 2015);
- Levi Stadium, Santa Clara (2014);
- Petco Park, San Diego (2004);
- StubHub Center, Carson (2003);
- AT&T Park, San Francisco (2000);
- Staples Center and the LA Live complex, Los Angeles (1999);
- Honda Center, Anaheim (1993); and
- Sleep Train Arena, Sacramento (1988).
- Sports venues with unique exemptions from full CEQA review
Other sports venues have either bypassed, been exempted from, or granted fast-tracking provisions for, CEQA, including:
- Los Angeles Stadium at Hollywood Park, Inglewood, which includes a stadium for the future home to the NFL’s Rams and Chargers, and was not subject to CEQA due to a ballot box loophole (Proposed opening in 2020);
- Golden 1 Center, Sacramento (opened in 2016), which, under SB 743 (Steinberg, Chapter 386, Statutes of 2013), was granted special administrative and judicial review procedures under CEQA for the arena, similar to the provisions of AB 987 currently in print;
- proposed Farmers Field in downtown Los Angeles, but a team was not found for this project; and
- proposed Los Angeles Stadium at Grand Crossing, City of Industry, but a team was not found for this project.
- Sports venues under the AB 900 framework
A framework for expediting certain major projects was established by AB 900 (Buchanan, Ch. 354, Stats. 2011), the Jobs and Economic Improvement Through Environmental Leadership Act of 2011. AB 900, which is part of CEQA, establishes CEQA administrative and judicial review procedures for an “environmental leadership development project” certified by the Governor and meeting specified conditions, including LEED silver-certified infill site projects, clean renewable energy projects, and clean energy manufacturing projects. (Pub. Res. Code Sec. 21178.)
According to the Office of Planning and Research, the following projects have had AB 900 applications submitted:
- McCoy Solar Energy Project (2012);
- Apple Campus 2 (2012);
- Soitec Solar Energy Project (2013);
- 8150 Sunset Boulevard (2014);
- Event Center and Mixed-Use Development at Mission Bay Blocks (The Golden State Warriors Arena) (2014);
- Qualcomm Stadium Reconstruction Project (2015);
- Crossroads Hollywood (2016);
- 6220 West Yucca Project (2017);
- 10 Van Ness Avenue Mixed-Use Project (2017);
- 1045 Olive Street Project (2018); and
- Hollywood Center Project (2018)
5. Comparison of this bill and the AB 900 framework
AB 900 was enacted to provide a set of minimum environmental and community benefit criteria that if achieved by a project would allow consideration as a Leadership Project. Such projects are subject to expedited CEQA administrative and judicial review procedures if they are certified by the Governor and meet specified conditions. These projects include LEED silver-certified infill site projects, clean renewable energy projects, and clean energy manufacturing projects. (Pub. Res. Code Sec. 21178.) AB 900 additionally provides that a leadership project:
- may be certified by the Governor only if it meets specified criteria, including all of the following:
- the project will result in a minimum investment of $100 million in California upon completion of construction;
- the project creates high-wage, highly skilled jobs that pay prevailing wages and living wages, provides construction jobs and permanent jobs for Californians, and helps reduce unemployment;
- the project does not result in any net additional GHG emissions; and
- the applicant has entered into a binding and enforceable agreement that all mitigation measures required under CEQA are to be conditions of approval of the project, and those conditions will be fully enforceable by the lead agency or another agency designated by the lead agency;
- the applicant bears the burden of costs for any hearing or decision before the Court of Appeal; and
- upon certification by the Governor, is submitted to the Joint Legislative Budget Committee for review and concurrence or non-concurrence (Pub. Res. Code Sec. 21184(a)-(c)); and
- upon certification of the EIR or any related project approvals, is subject to review, including any appeals, for 270 days, pursuant to rules adopted by the Judicial Council (Pub. Res. Code Sec. 21185; Cal Rules of Court, Rule 3.2220 et seq.).
This bill deviates from the minimum standard established by AB 900 in several key ways. In particular AB 987:
- is not subject to the Governor’s certification;
- is not subject to review by the Joint Legislative Budget Committee;
- requires the project to meet certain standards after its completion, including:
- Within a year of the completion of the first NBA season in which an NBA team plays in the arena (the 2024-2025 season at the earliest):
- at least a LEED Gold rating;
- net zero emissions
- By 2030:
- a transportation management plan or transportation demand management program, or both, that achieves a 15 percent reduction in the number of per capita vehicle trips by attendees, employees, visitors, and customers as compared to operations of the arena absent the transportation management plan or transportation demand management program.
- Within a year of the completion of the first NBA season in which an NBA team plays in the arena (the 2024-2025 season at the earliest):
By contrast, AB 734 (Bonta), another CEQA stadium bill before this committee, shares more in common with AB 900. That bill would provide for expedited administrative and judicial review of environmental documents and approvals granted for a project related to the development of an “Oakland Sports and Mixed-Use Project” in the City of Oakland, if the project meets certain criteria. As amended in the Senate Environmental Quality Committee, that bill would require the project to be certified by the Governor before the project is eligible for the streamlined process. The bill authorizes the Governor to issue guidelines regarding application and certification. Although the certification criteria in the bill are narrow—the project must provide for prevailing wages and the applicant bears the burden of costs for any hearing or decision before the Court of Appeal—the author committed to work with the staff of the Senate Environmental Quality Committee to incorporate certification by the Governor as specified in AB 900.
6. Negative impacts on the courts and the environment
Existing law requires the courts to give CEQA-related cases preference over “all other civil actions… so that the action or proceeding shall be quickly heard and determined.” (Pub. Res. Code Sec. 21167.1). This bill would provide that any challenge against the certification of an EIR for the project or granting of any project approvals, in order to require the actions or proceeding, including any appeals, to be resolved, to the extent feasible, within 270 days of the certification of the record of proceedings, as specified. However, certain aspects of the project would not be required to be achieved until well into the future: LEED certification and net-zero emissions by the 2024-2025 NBA season at the earliest, and a transportation management plan or transportation demand management program by 2030.
Writing in opposition, the Judicial Council of California expresses concerns regarding the impact on courts and other litigants:
AB 987’s requirement that any CEQA lawsuit challenging the Inglewood sports and entertainment project, including any appeals therefrom, be resolved within 270 days is problematic for a number of reasons. First, CEQA actions are already entitled under current law to calendar preference in both the superior courts and the Courts of Appeal. Imposing a 270-day timeline on top of the existing preference is arbitrary and likely to be unworkable in practice.
Second, the expedited judicial review for the specific project covered by AB 987 will likely have an adverse impact on other cases. Like other types of calendar preferences, which the Judicial Council has historically opposed, setting an extremely tight timeline for deciding this particular type of case has the practical effect of pushing other cases on the courts’ dockets to the back of the line. This means that other cases, including cases that have statutorily mandated calendar preferences, such as juvenile cases, criminal cases, and civil cases in which a party is at risk of dying, will take longer to decide. Moreover, delays in the administration of justice that would likely result from any expansion of this expedited judicial review approach would be even more pronounced in light of the ongoing fiscal limitations faced by the judicial branch.
Finally, providing expedited judicial review for the specific project covered by AB 987 while other cases proceed under the usual civil procedure rules and timelines undermines equal access to justice. The courts are charged with dispensing equal access to justice for each and every case on their dockets. Singling out this particular type of case for such preferential treatment is fundamentally at odds with how our justice system has historically functioned.
7. Expedited review without a clear need for expediency
The LA Clippers have a lease to play at Staples Center in downtown Los Angeles through 2024. As stated in the Senate Committee on Environmental Quality analysis of the bill, “what is known about the proposed arena seems more like a general idea of a project – there are no public site plans or renderings; the only specifics made publicly available are that it will be privately financed, seat 18,000 to 20,000 people, will include parking, a practice facility, and team offices; Inglewood is in the middle of formal negotiations with the Clippers over the facility.” It is not clear what urgency justifies expedited CEQA review.
In opposition, MSG Forum LLC writes:
Contrary to some statements, this is not like the bill championed by Senator Steinberg in 2013 for the Kings arena in downtown Sacramento. In the case of the Kings arena, there were detailed plans, analyses, and many hearings and meetings with the City and community. The proposed Kings arena had been under consideration for several years. Also, importantly, the key reason for expediting the Kings arena is not present now in Inglewood. After many years of processing the project, the Kings were prepared to leave California if the arena could not be guaranteed by October 2016. That is fundamentally different than the circumstances presented here. The Clippers have a lease to play in Staples Center until the end of the 2024 season. There is no need for this legislation. There is time to comply with CEQA. There is no need to take the community’s rights away for unspecified projects.
8. Concerns regarding the impacts on the local residential community
The proposed project area would be near a low-income residential area that consists predominately of Latino and African-American residents. The bill’s justification for enacting a special statute states in this regard that “The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances of the construction of a major new sports venue in the City of Inglewood, a city with the largest minority population in the United States, which will provide essential economic stimulus.”
However, some in the local community have objected to the project. In opposition, Chatten-Brown & Carstens LLP writes:
Over 3,000 low income African American and Latino residents will be directly impacted by this bill which would undermine decades of environmental protections. And they signed petitions opposing this arena in their neighborhood, directly next to their homes. They have attended Council meetings to protest the arena in their neighborhood. And they have stood outside the Clippers press conference, held back by the police, to protest the arena. And they have been ignored by the Mayor, the City Council and the Clippers.
9. Should this project be subject to the AB 900 process?
Considering the issues raised above, the Committee may wish to consider whether this bill is prudent or whether it would be more appropriate for the City of Inglewood, as the lead agency for the proposed arena for the Los Angeles Clippers, to consider applying for the AB 900 process, which provides for expedited review under an established framework that lacks many of the infirmities of the bill. To that end, the AB 900 framework, which will sunset on January 1, 2021, could be extended specifically for this project.
Support: Al’s Powerwash, Inc.; American Federation of State, County and Municipal Employees; California Conference of Carpenters; California Nevada Conference of Operating Engineers; California Pipe Trades Council; California State Association of Electrical Workers; California State Council of Laborers; California Teamsters; FASTSIGNS Inglewood; Inglewood Airport Chamber of Commerce; James Butts, Mayor of Inglewood; JAMZ Creamery; Marvin Engineering; Middle Bar; Rotary Club of Inglewood; Painters & Allied Trades – District Council 36; True Vine Baptist Church; Western States Council of Sheet Metal Workers; WLM Financial
Opposition: Black Community, Clergy and Labor Alliance; Chatten-Brown & Carstens LLP; Crenshaw Subway Coalition; Inglewood Residents Against Takings and Evictions; Judicial Council of California; MSG Forum LLC; New Frontier Democratic Club; Sierra Club; Southern Christian Leadership Conference; Uplift Inglewood Coalition
HISTORY
Source: Author
Related Pending Legislation: AB 734 (Bonta, 2018) Establishes specified administrative and judicial review procedures for the administrative and judicial review of the EIR and approvals granted for a project related to the development of a “Oakland Sports and Mixed-Use Project” in the City of Oakland meeting certain requirements. This bill is set to be heard in this Committee on June 26, 2018.
Prior Legislation:
SB 743 (Steinberg, Ch. 386, Stats. 2013) established specified administrative and judicial review procedures for review of the EIR and public agency approvals granted for a project related to the development of an entertainment and sports center in the City of Sacramento. Additionally, this bill provides that aesthetic and parking impacts of a residential, mixed-use residential, or employment center project on an infill site within a transit priority area shall not be considered significant impacts on the environment under CEQA, as specified.
AB 900 (Buchanan, Ch. 354, Stats. 2011), the Jobs and Economic Improvement Through Environmental Leadership Act of 2011, established specified administrative and judicial review procedures for the review of the EIR and public agency approvals granted for designated residential, retail, commercial, sports, cultural, entertainment, or recreational use projects, or clean renewable energy or clean energy manufacturing projects.
Prior Vote:
Senate Environmental Quality Committee (Ayes 7, Noes 0)
Senate Governmental Organization Committee (Ayes 10, Noes 0)
Assembly Floor (Ayes 76, Noes 0)
Assembly Appropriations Committee (Ayes 16, Noes 0)
Assembly Governmental Organization Committee (Ayes 20, Noes 0)
**************
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Wieckowski, Chair
2017 - 2018 Regular
Bill No: AB 987
Author: | Kamlager-Dove | ||
Version: | 6/7/2018 | Hearing Date: | 6/20/2018 |
Urgency: | No | Fiscal: | Yes |
Consultant: | Rachel Machi Wagoner | ||
SUBJECT: California Environmental Quality Act: sports and entertainment project
ANALYSIS:
Existing law, under the California Environmental Quality Act (CEQA):
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration, mitigated declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines). (Public Resources Code (PRC) §21000 et seq.).
- Sets requirements relating to preparation, review, comment, approval and certification of environmental documents, as well as procedures relating to an action or proceeding to attack, review, set aside, void, or annul various actions of a public agency on the grounds of noncompliance with CEQA.
- Requires courts to give CEQA-related actions or proceedings preference over all other civil actions so that the action or proceeding is quickly heard and determined. (PRC §21167.1).
- Under the Jobs and Economic Improvement Through Environmental Leadership Act of 2011 (AB 900, Buchanan, Gordon, Chapter 354, Statutes of 2011) (AB 900), which is part of CEQA, establishes CEQA administrative and judicial review procedures for an “environmental leadership development project.” (PRC §21178 et seq.).
- Establishes procedures for expedited judicial review (i.e., requiring the courts to resolve lawsuits within 270 days) for “environmental leadership” projects certified by the Governor and meeting specified conditions, including LEED silver-certified infill site projects, clean renewable energy projects, and clean energy manufacturing projects.
- Defines “environmental leadership” project as a CEQA project that is one of the following:
- A residential, retail, commercial, sports, cultural, entertainment, or recreational use project that is certified as LEED gold or better by the United States Green Building Council and, where applicable, that achieves a 15% greater standard for transportation efficiency than for comparable projects.
- Requires that these projects be located on an infill site.
- Requires a project that is within a metropolitan planning organization for which a Sustainable Communities Strategy (SCS) or alternative planning strategy (APS) is in effect, to be consistent with specified policies in either the SCS or APS, which, if implemented, would achieve greenhouse gas emission (GHG) reduction targets.
- Requires a project applicant to demonstrate compliance with the requirement that generators of commercial solid waste and large amounts of organic waste arrange for recycling services for those materials.
- A clean renewable energy project that generates electricity exclusively through wind or solar, but not including waste incineration or conversion.
- A clean energy manufacturing project that manufactures products, equipment, or components used for renewable energy generation, energy efficiency, or for the production of clean alternative fuel vehicles.
- Allows a person proposing to construct a leadership project to apply to the Governor for certification that the leadership project is eligible for streamlining. Requires the person to supply evidence and materials that the Governor deems necessary to make a decision on the application. Requires any evidence or materials be made available to the public at least 15 days before the Governor certifies a project pursuant to AB 900.
- Authorizes the Governor to certify a leadership project if the Governor finds the project meets all of the following conditions:
- The project will result in a minimum investment of $100 million in California upon completion of construction.
- The project creates high-wage, highly skilled jobs that pay prevailing wages and living wages, provides construction jobs and permanent jobs for Californians, and helps reduce unemployment.
- The project does not result in any net additional GHG emissions, including emissions from employee transportation, as determined by the Air Resources Board pursuant to the California Global Warming Solutions Act of 2006.
- The project applicant has entered into a binding and enforceable agreement that all mitigation measures required under CEQA shall be conditions of approval of the project, and those conditions will be fully enforceable by the lead agency or another agency designated by the lead agency. In the case of environmental mitigation measures, the applicant agrees, as an ongoing obligation, that those measures will be monitored and enforced by the lead agency for the life of the obligation.
- The project applicant agrees to pay the costs of the Court of Appeal in hearing and deciding any case, including payment of the costs for the appointment of a special master if deemed appropriate by the court, in a form and manner specified by the Judicial Council.
- The project applicant agrees to pay the costs of preparing the administrative record for the project concurrent with review and consideration of the project pursuant to CEQA, in a form and manner specified by the lead agency for the project.
- Requires the Governor, prior to certifying a project, to make a determination that each of the conditions specified above has been met. These findings are not subject to judicial review.
- If the Governor determines that a leadership project is eligible for streamlining, requires the Governor to submit that determination, and any supporting information, to the Joint Legislative Budget Committee (JLBC) for review and concurrence or non-concurrence.
- Requires the JLBC to concur or non-concur in writing within 30 days of receiving the Governor’s determination.
- Deems the leadership project certified if the JLBC fails to concur or non-concur on a determination by the Governor within 30 days of the submittal.
- Authorizes the Governor to issue guidelines regarding application and certification of projects pursuant to AB 900. These guidelines are not subject to the rulemaking provisions of the Administrative Procedure Act.
- Requires the Judicial Council to adopt a rule of court to establish procedures that require resolution within 270 days, including any appeals, of a lawsuit challenging the certification of the EIR or any project approvals for a certified environmental leadership project.
- Prohibits AB 900 from applying to a leadership project if the applicant fails to notify a lead agency prior to the release of the draft EIR for public comment.
- Sets requirements for preparation and certification of the record of proceeding for a leadership project certified by the Governor.
- Requires the draft and final EIR to include a specified notice in no less than 12-point type regarding the draft and final EIR being subject to AB 900.
- Provides that provisions of AB 900 are severable.
- Provides that nothing in AB 900 affects the duty of any party to comply with CEQA, except as otherwise provided in AB 900.
- Prohibits AB 900 from applying to a leadership project if the Governor does not certify the project prior to January 1, 2020.
- Provides that certification of the leadership project expires and is no longer valid if the lead agency fails to approve the project prior to January 1, 2021.
- Establishes procedures for expedited judicial review (i.e., requiring the courts to resolve lawsuits within 270 days) for “environmental leadership” projects certified by the Governor and meeting specified conditions, including LEED silver-certified infill site projects, clean renewable energy projects, and clean energy manufacturing projects.
This bill:
- Establishes specified administrative and judicial review procedures for the administrative and judicial review of the EIR and approvals granted for a project related to the development of a specified sports and entertainment project in the City of Inglewood meeting certain requirements.
- Defines “sports and entertainment project” as approximately one square mile area located within the City of Inglewood consisting of both of the following areas:
- Real property consisting of approximately 298 acres that is located within the boundaries of the Hollywood Park Specific Plan, as of July 1, 2017.
- Real property consisting of approximately 59 acres, beginning at a point located 540 feet west of the intersection of the centerline of South Prairie Avenue and the northern boundary of West Century Boulevard, then southerly along a straight line to the southern boundary of West 102nd Street, then easterly along West 102nd Street to the western boundary of South Prairie Avenue, then southerly along the western boundary of South Prairie Avenue to the southern boundary of West 103rd Street, then easterly along a straight line to the eastern boundary of South Doty Avenue, then northerly along Doty Avenue to the southern boundary of West 102nd Street, then easterly along West 102nd Street to the eastern boundary of Yukon Avenue, then northerly along Yukon Avenue to the northern boundary of West Century Boulevard, then westerly along West Century Boulevard to the point located 540 feet west of the intersection of the centerline of South Prairie Avenue and the northern boundary of West Century Boulevard.
- Provides, for an EIR for a project under this statute, the lead agency need not consider comments filed after the close of the public comment period for the draft EIR and any judicial action challenging the certification of the EIR is subject to the specified procedures and limitations.
- Requires, on or before July 1, 2019, the Judicial Council amend the California Rules of Court, as specified.
- Provides that the court shall only enjoin those specific activities associated with the project that present an imminent threat to public health and safety or that materially, permanently, and adversely affect unforeseen important Native American artifacts or unforeseen important historical, archaeological, or ecological values, as specified.
Background
- Previous, related bills for mega projects.
- AB 900 and SB 292. AB 900 (Buchanan, Gordon, Chapter 354, Statutes of 2011) and SB 292 (Padilla, Chapter 353, Statutes of 2011) and SB 246, Chapter 354 ,Statutes of 2017) established expedited CEQA judicial review procedures for a limited number of projects. For AB 900, it was large-scale projects meeting extraordinary environmental standards and providing significant jobs and investment. For SB 292, it was a proposed downtown Los Angeles football stadium and convention center project achieving specified traffic and air quality mitigations. The stadium project subject to SB 292 has not proceeded.
For these eligible projects, the bills provided for original jurisdiction by the Court of Appeal and a compressed schedule requiring the court to render a decision on any lawsuit within 175 days. This promised to reduce the existing judicial review timeline by 100 days or more, while creating new burdens for the courts and litigants to meet the shortened schedule.
AB 900’s provision granting original jurisdiction to the Court of Appeal was invalidated in 2013 by a decision in Alameda Superior Court in Planning and Conservation League v. State of California. - SB 743 (Steinberg, Chapter 386, Statutes of 2013). Subsequent to the Alameda Superior Court holding mentioned above, SB 743 repealed the provision that gave original jurisdiction to the Court of Appeal and required Judicial Council to adopt a rule of court mandating lawsuits and any appeals to be resolved within 270 days.
Also, SB 743 (Steinberg) established special CEQA procedures modeled on SB 292 for the Sacramento Kings arena project. Like SB 292, SB 743 applied to a single project and included specified traffic and air quality mitigations. CEQA lawsuits were filed against the Kings arena, and the lawsuits, including appeals, were resolved 267 days after certification of the record. - AB 900 projects to date. Six projects have been certified under AB 900. The deadline for AB 900 certification under current law has passed (which was January 1, 2016). According to the Office of Planning and Research, the following projects have had AB 900 applications submitted:
- McCoy Solar Energy Project (January 12, 2012);
- Apple Campus 2 (April 19, 2012);
- Soitec Solar Energy Project (January 7, 2013);
- 8150 Sunset Boulevard (January 31, 2014);
- Event Center and Mixed-Use Development at Mission Bay Blocks (The Golden State Warriors Arena) (February 17, 2014);
- Qualcomm Stadium Reconstruction Project (August 25, 2015);
- Crossroads Hollywood (August 29, 2016); and,
- 6220 West Yucca Project (April 17, 2017).
- 10 Van Ness Avenue Mixed-Use Project (October 4, 2017)
- 1045 Olive Street Project (December 19, 2018)
- Hollywood Center Project (May 2, 2018)
- AB 900 and SB 292. AB 900 (Buchanan, Gordon, Chapter 354, Statutes of 2011) and SB 292 (Padilla, Chapter 353, Statutes of 2011) and SB 246, Chapter 354 ,Statutes of 2017) established expedited CEQA judicial review procedures for a limited number of projects. For AB 900, it was large-scale projects meeting extraordinary environmental standards and providing significant jobs and investment. For SB 292, it was a proposed downtown Los Angeles football stadium and convention center project achieving specified traffic and air quality mitigations. The stadium project subject to SB 292 has not proceeded.
- What’s going on in the City of Inglewood?
- City of Inglewood. Inglewood was incorporated in 1908 and is located in southwest of downtown Los Angeles, close to the Los Angeles International Airport (about 4 miles away). The city has a total of 9.1 square miles. According to the 2010 U.S. Census, the city had a population of approximately 110,000. Inglewood had a median household income of $43,394, with 22.4% of the population living below the federal poverty line.
In June 2017, Mayor James Butts and council members approved an Exclusive Negotiation Agreement (ENA) with Clippers-controlled company, Murphy’s Bowl LLC. The agreement gives the Clippers 3 years to conduct feasibility studies, and decide whether to build an arena in Inglewood – it is not an agreement to allow the Clippers to begin construction. The vetting process includes an environmental impact report. [Inglewood was paid or will be paid $1.5M to provide city services connected with the project.] - Los Angeles (LA) Clippers. The LA Clippers currently play at the multi-purpose sports arena, Staples Center, in downtown LA and their lease runs through 2024.
- Los Angeles Stadium at Hollywood Park. The proposed new NFL football stadium, the Los Angeles Stadium at Hollywood Park in Inglewood is located across the street from the proposed basketball arena for the LA. Clippers.
The stadium was subject to a ballot initiative, which provided a means for bypassing CEQA altogether. A voter-proposed initiative is not subject to CEQA because it is not considered a discretionary action by the lead agency. Although the 298-acre, 80,000 seat, and 10,000 parking space stadium project will likely have significant environmental impacts, those impacts will likely go unmitigated without an environmental review. - The Forum. The Forum was built in 1967 and was the home of NBA’s Los Angeles Lakers and NHL’s Los Angeles Kings. In 1999, both teams moved from the Forum to the Staples Center; and the Forum was sold to the Faithful Central Bible Church. In 2012, the Forum was purchased by The Madison Square Garden (MSG) Company, owners of New York’s Madison Square Garden, for $23.5 million. MSG spent $100M to refurbish and renovate the arena, which is now a large indoor performance venue designed for music and entertainment and seats 17,500 people.
- City of Inglewood. Inglewood was incorporated in 1908 and is located in southwest of downtown Los Angeles, close to the Los Angeles International Airport (about 4 miles away). The city has a total of 9.1 square miles. According to the 2010 U.S. Census, the city had a population of approximately 110,000. Inglewood had a median household income of $43,394, with 22.4% of the population living below the federal poverty line.
- MSG Forum v. City of Inglewood. According to the MSG Forum, LLC’s Notice of Claim for Damages (dated July 17, 2017):
In or about May 2012, the Forum and The Forum Enterprises, Inc. entered into a Development Agreement and other related agreements and documents with the City of Inglewood (“City”) regarding the development of the venue commonly known as the Forum, and specifically permitting a wide range of activities at the Forum, including concerts and other events. In reliance on this Development Agreement, including the specific contractual commitments set forth in the Development Agreement and the City’s representations and covenants therein, the Forum invested more than $100 million in purchasing and rehabilitating the Forum property, transforming it from a moribund shell into one of the premier concert venues in the country. The Forum has invested millions more dollars since the Forum reopened in early 2014.
In connection with redeveloping the Forum, on or about July 9, 2013, the Forum entered into a Parking Lease agreement with the City. Among other things, the Parking Lease gave the Forum the right to use certain City-owned property located near the Forum for parking purposes. The Parking Lease also gave the Forum the right to purchase some or all of that property, in its discretion, for the price set forth in the Parking Lease. After entering into the Parking Lease, the Forum made physical improvements to the City-owned property for parking purposes.
Recently, Mayor Butts informed the Forum that the City needed the Forum to terminate the Parking Lease so that the City could use the Parking Lease property for a technology park. Mayor Butts requested that the Forum terminate the Parking Lease so that he could implement a “silicon beach” for the City. In reasonable reliance on Mayor Butts’s statements that the property would be used for this purpose (and thus would not be used for any other purpose detrimental to the Forum’s operations) – and in view of Mayor Butts’ repeated requests and his position in the City – the Forum acquiesced to Mayor Butts’s request to terminate the Parking Lease. The parties subsequently executed a Lease Termination Agreement, dated April 3, 2017. Had the Forum known of the City’s true intentions, it never would have entered into the Lease Termination Agreement.
The City did not, however, use the Parking Lease property for a technology park or comparable development, nor (on information and belief) did it ever intend to do so. Instead, just two months later, on June 15, 2017, the City announced that it intended to enter into an Exclusive Negotiating Agreement (“ENA”) with Murphy’s Bowl LLC, regarding the development of a competitive arena on a proposed “Site,” which encompassed the very same property that was subject to the Forum’s Parking Lease within the City. The City, the Successor Agency to the Inglewood Redevelopment Agency (“Successor Agency”), and the Inglewood Parking Authority (“Authority”) approved the ENA the very same day. Pursuant to the ENA and the proposed development of the arena, the City, the Successor Agency and the Authority propose to have the City and/or the Authority condemn large swaths of private property, and as a result of their actions, numerous families will lose their homes, and businesses, both small and large, will be destroyed. The actions of the City – acting in concert with the Successor Agency and the Authority – have already negatively impacted the Forum, and if the arena is constructed, then their actions will have materially financially impacted the operations, competitiveness and financial position of the Forum.
The arena (and related development) contemplated in the ENA would be directly competitive with the Forum’s operations, including its position as a leading concert venue, in direct conflict with the City’s commitments under the Parking Lease and the Development Agreement and the Forum’s rights thereunder…
In light of the City’s (and/or Successor Agency’s and Authority’s) fraudulent inducement to enter into the Lease Termination Agreement, and the City’s breach of the Parking Lease, the Forum lost its ability both to use the City-owned property subject to the Parking Lease, and to purchase that property for the price set forth in the Parking Lease.
Further, in light of the City’s, Successor Agency’s and Authority’s concerted actions, including the breach of the Development Agreement and other agreements between the parties, and as a result of the actions contemplated in the ENA, the Forum has suffered and will suffer significant monetary damages, including without limitation potential adverse impacts on the value of the Forum and loss of future revenues at the Forum.
The plaintiff states, “We hereby demand that the City, the Parking Authority and the Successor Agency immediately terminate the ENA as invalid and unenforceable, and immediately cease any further action to encourage the development of another arena in the City of Inglewood in breach of the express contractual commitments the City has made to the Forum. Further, we request immediate reinstatement of the Parking Lease terminated as a result of fraudulent misrepresentations by City (and Successor Agency and Parking Authority) officials.” This case is currently pending.
Comments
- According to the author, “The Los Angeles Clippers NBA basketball team has expressed a desire to move to the City of Inglewood and construct a state of the art basketball arena adjacent to the new location for the NFL Los Angeles Rams Inglewood stadium, however this move requires that the new arena be available for the 2024 NBA season. AB 987 seeks to provide to the new Clippers area CEQA streamlining relief equivalent to what was granted to the new Sacramento Kings arena and the new Golden State Warriors arena in San Francisco. Under current law, construction projects may be delayed for years before breaking ground. This bill seeks to provide the same 270 day expedited judicial review which has been granted to other arena/stadium projects.”
- Sports venues and CEQA. Since the establishment of CEQA over 45 years ago, several sports venues have been proposed or built in California. Some have fully abided by CEQA while others have not.
- A number of major league sports venues that have been built and fully complied with CEQA, include:
- Avaya Stadium, Santa Clara, which is home to the Major League Soccer (MLS) team, San Jose Earthquakes (Construction cost: $100M. Opened in 2015).
- Levi Stadium, Santa Clara, which is home to the National Football League (NFL) team, San Francisco 49ers (Construction cost: $1.3B. Opened in 2014).
- Petco Park, San Diego, which is home of the Major League Baseball (MLB) team, San Diego Padres (Construction cost: $453M. Opened in 2004).
- StubHub Center, Carson, which is home to the MLS team, LA Galaxy; and, the NFL team, Los Angeles Chargers (Construction cost: $150M. Opened in 2003). The Los Angeles Chargers will play at StubHub Center through 2019.
- AT&T Park, San Francisco, which is home to MLB team, San Francisco Giants (Construction cost: $357M. Opened in 2000).*
* Some people mistakenly believe that the San Francisco Giants’ baseball park was exempted from CEQA. SB 181 (Kopp), Chapter 4, Statutes of 1997, exempted from CEQA the relocation of occupants or uses from real property pursuant to the Relocation Assistance Act on property consisting of the site on which the San Francisco Giants Ballpark is located. It should be noted that SB 181 specified that the exemption could not affect the application of CEQA to any discretionary action by a public agency not otherwise exempted by this provision, including the ballpark construction. Also, SB 181 prohibited the exemption from restricting the ability or rights of relocated occupants to challenge or appeal the relocation options. - Staples Center and the LA Live complex, Los Angeles, which is home to the Women’s NBA team, Los Angeles Sparks; the NBA teams, Los Angeles Lakers and the Los Angeles Clippers; and, the National Hockey League (NHL) team, Los Angeles Kings. (Construction cost: $375M. Opened in 1999).
- Honda Center, Anaheim, which is home to the NHL team, Anaheim Ducks (Construction cost: $123M. Opened in 1993).
- Sleep Train Arena, Sacramento, which was home to the NBA team, Sacramento Kings (Construction cost: $40M. Opened in 1988).
- Avaya Stadium, Santa Clara, which is home to the Major League Soccer (MLS) team, San Jose Earthquakes (Construction cost: $100M. Opened in 2015).
- Other sports venues, which have either bypassed, been exempted from, or granted fast-tracking provisions to CEQA, include:
- Los Angeles Stadium at Hollywood Park, Inglewood, which includes a stadium for the future home to the NFL’s Rams and Chargers, was not subject to CEQA due to a ballot box loophole. The stadium project was subject to a ballot initiative. A voter-proposed initiative is not subject to CEQA. In this case, in February 2015, Inglewood City Council approved the ballot measure directly and avoided an election altogether, which denied voters the opportunity to even vote on the proposal. Although the 298-acre, 80,000 seat, and 10,000 parking space stadium project will likely have significant environmental impacts, those impacts likely go unmitigated without an environmental review. The sports and entertainment district is under construction. (Projected cost: $2.6B. Proposed opening in 2020.)
The Los Angeles Rams and Los Angeles Chargers were to open at the new stadium in 2019, but are delayed by one year until 2020 due to rainfall. - A proposed stadium in Carson City, which would have been home to the San Diego Chargers and Oakland Raiders, also would have bypassed CEQA altogether via the ballot box initiative process. After two months of public announcement of the stadium project and eight days to collect more than 15,000 signatures in March, 2015, the Carson City Council approved the stadium in April, 2015. Like Inglewood, the voters in Carson City were denied the opportunity to vote on the ballot initiative and the project was not subject to an environmental review or any potential mitigation. (Projected cost: $1.7B.)
Neither NFL team will be playing at the proposed stadium. In March, 2017, the NFL gave approval for the Oakland Raiders to relocate from Oakland to Las Vegas, Nevada. As noted above, the Los Angeles Chargers will begin playing at the Los Angeles Stadium at Hollywood Park in Inglewood, in 2020. - Chase Center Arena, San Francisco, which will be home to the Golden State Warriors in the future, is subject to AB 900, which expedites the CEQA judicial process. (Detailed background below on AB 900.) The arena broke ground in January, 2017, and is currently under construction. (Projected cost: $1B. Proposed opening in 2019)
In addition, AB 1273 (Ting, Chapter 381, Statutes of 2013) authorized the State Lands Commission (SLC) to approve a multi-use development on public trust lands in San Francisco (Pier 30-32) that included a multipurpose venue (for Golden State Warriors basketball games and other events), if SLC found that certain conditions were met. However, the Golden State Warriors abandoned their plan to build an arena on Piers 30-32. - Qualcomm Stadium Reconstruction Project, San Diego – This project was subject to an AB 900 expedited administrative and judicial review. (2015). The stadium was home to the San Diego Chargers, which moved from Qualcomm to the StubHub Center in Carson, California, following the 2016 NFL season.
(The Los Angeles Chargers will use the StubHub stadium from 2017 until the completion of the Los Angeles Stadium in Hollywood Park, which is planned to open in 2020.) - Golden 1 Center, Sacramento, which is home to NBA’s Sacramento Kings (Construction cost: $558.2M. Opened in 2016): SB 743 (Steinberg, Chapter 386, Statutes of 2013), among other things, established special administrative and judicial review procedures under CEQA for the arena.
- Proposed Farmers Field, downtown Los Angeles: SB 292 (Padilla, Chapter 353, Statutes of 2011), established expedited judicial review procedures and required implementation of specified traffic and air quality mitigation measures under CEQA for a proposed new sports arena and convention center, Anschutz Entertainment Group’s (AEG’s) Farmers Field, in downtown Los Angeles. It is questionable whether the Farmers Field stadium will actually be built. In late March 2013, Los Angeles officials agreed to pursue a parallel track for redeveloping the city’s convention center in the event that AEG and National Football League (NFL) failed to reach agreement on the Farmers Field stadium downtown.
AEG had until October 2014 to find a team before its project agreement with the city expired. A team was not found. - Proposed Los Angeles Stadium at Grand Crossing, City of Industry: ABx3 81 (Hall, Chapter 30, Statutes of 2009), waived environmental review and land use planning requirements as they applied to a proposed NFL football stadium project in the City of Industry. Proponents contended that absent the bill, the project would be delayed needlessly and would jeopardize the project’s financing and postpone the project’s economic benefits.
The project never broke ground. The proposal received approval from regulatory authorities but never found an NFL team willing to move into the proposed stadium.
- Los Angeles Stadium at Hollywood Park, Inglewood, which includes a stadium for the future home to the NFL’s Rams and Chargers, was not subject to CEQA due to a ballot box loophole. The stadium project was subject to a ballot initiative. A voter-proposed initiative is not subject to CEQA. In this case, in February 2015, Inglewood City Council approved the ballot measure directly and avoided an election altogether, which denied voters the opportunity to even vote on the proposal. Although the 298-acre, 80,000 seat, and 10,000 parking space stadium project will likely have significant environmental impacts, those impacts likely go unmitigated without an environmental review. The sports and entertainment district is under construction. (Projected cost: $2.6B. Proposed opening in 2020.)
- A number of major league sports venues that have been built and fully complied with CEQA, include:
As shown above, of the seven major league sports venues that obtained various short-cuts around CEQA, over half of them were either not built or will not house a major league sports team as hoped; and all for reasons unrelated to CEQA.
- What is the need for the rush? The LA Clippers have a lease to play at Staples Center in downtown Los Angeles through 2024. They have over 6 years to plan and construct the arena and the LA Clippers will continue to play at the Staples Center in the meantime. In addition, what is known about the proposed arena seems more like a general idea of a project – there are no public site plans or renderings; the only specifics made publicly available are that it will be privately financed, seat 18,000 to 20,000 people, will include parking, a practice facility, and team offices; thy city of Inglewood is in the middle of formal negotiations with the Clippers over the facility.
In addition, as noted above, the City of Inglewood has entered into a 3-year ENA with Murphy’s Bowl LLC for purposes related to the proposed project site, which includes parcels owned by third parties.
Considering the ample amount of time before the arena is scheduled to open in 2024 to conduct environmental reviews, obtain necessary permits, and construct the projects, the Committee may wish to consider the need for this bill. - Litigation shot clock. This bill provides for expedited judicial review procedures under CEQA for a proposed project in the City of Inglewood.
- This bill does not guarantee all lawsuits on a project will be resolved within 270 days. Example: Golden State Warriors Arena and two lawsuits. One project subject to the AB 900 expedited judicial process is the Golden State Warriors Arena and related development at Mission Bay in San Francisco has been challenged under CEQA. One of the plaintiffs, Mission Bay Alliance, which is a coalition of University of California, San Francisco (UCSF) stakeholders, donors, faculty, and physicians, argued that the 18,500-seat arena would congest area streets with traffic, slowing down access to the UCSF Medical Center at Mission Bay, which is located across the street from the proposed arena. In addition, the plaintiff contended that the basketball arena in Mission Bay is at odds with the cluster of life science research and health care facilities that have been built in the neighborhood.
The case, Mission Bay Alliance et al. v Office of Community Investment and Infrastructure, was initially filed on January 7, 2016, in Sacramento County Superior Court. The Golden State Warriors moved for a change of venue and on February 3, 2016 the Sacramento Superior Court granted this request. On March 11, 2016, the CEQA case was received and filed in the San Francisco County Superior Court. On July 18, 2016, a trial court ruled in favor of the project sponsor, the Warriors. On November 29, 2016, the Court of Appeal issued its decision on the case, 327 days after the petition was initially filed. The decision was appealed; and ultimately, in January 2017, the California Supreme Court declined to hear the case.
The above lawsuit is one of two legal challenges filed by the Mission Bay Alliance in regards to the Warriors arena; the second of which is not CEQA-related.
In the second lawsuit, filed in Alameda County, the plaintiffs seek to invalidate an agreement between UCSF and the Warriors, which included a $10 million Mission Bay Transportation Improvement Fund for controlling traffic flow in the area. The plaintiffs contend that the UCSF Chancellor went beyond his authority in reaching this agreement without UC Regents approval. Although the CEQA case had concluded as of January, 2017, the second, non-CEQA-related case in Alameda was still pending at that time.
The Warriors team has stated that the lawsuits have delayed the opening of the arena by one year, to 2019. One lawsuit had special, fast-tracking CEQA-related litigation privileges and the other does not. Although AB 900 expedited the litigation process for the CEQA case, the second lawsuit demonstrates that CEQA is not the only body of law subject to civil litigation and that AB 900 does not guarantee a project from being litigation-free after 270 days. Rather, there is a cavalry of non-CEQA-related causes of action from which a plaintiff may choose and that are subject to standard civil procedure rules.
As demonstrated above, a special CEQA litigation process cannot expedite or insulate a project from non-CEQA-related litigation and cannot ensure that a project will be completed faster. - Equal justice for all? Court calendar preference and guaranteed time frames. Current law requires the courts to give CEQA-related cases preference over “all other civil actions… so that the action or proceeding shall be quickly heard and determined.” (PRC §21167.1). In addition to this existing mandate, SB 734 provides that the courts must complete the judicial review process in a given time frame for certain CEQA-related actions or proceedings when specified criteria are met.
As a consequence, such mandates on a court delay access for other cases as well as potentially exacerbating a court’s backlog on civil documents such as filing a new civil complaint, processing answers and cross complaints, or processing a demurrer or summary judgment. As Judicial Council notes, “[S]etting an extremely tight timeline for deciding these cases has the practical effect of pushing other cases on the courts’ dockets to the back of the line. This means that other cases, including cases that have statutorily mandated calendar preferences, such as juvenile cases, criminal cases, and civil cases in which a party is at risk of dying, will take longer to decide.”
This bill requires a court to make room on its calendar, potentially pushing other cases aside, to ensure that specified time frames are met on certain CEQA cases. Calendar preferences and guaranteed time frames create additional demands and burden on our courts that have very limited resources and a never-ending supply of cases to hear.
- This bill does not guarantee all lawsuits on a project will be resolved within 270 days. Example: Golden State Warriors Arena and two lawsuits. One project subject to the AB 900 expedited judicial process is the Golden State Warriors Arena and related development at Mission Bay in San Francisco has been challenged under CEQA. One of the plaintiffs, Mission Bay Alliance, which is a coalition of University of California, San Francisco (UCSF) stakeholders, donors, faculty, and physicians, argued that the 18,500-seat arena would congest area streets with traffic, slowing down access to the UCSF Medical Center at Mission Bay, which is located across the street from the proposed arena. In addition, the plaintiff contended that the basketball arena in Mission Bay is at odds with the cluster of life science research and health care facilities that have been built in the neighborhood.
- AB 900 vs AB 987 Comparison. AB 246 (Santiago, Chapter 522, Statutes of 2017) extends for two years the expedited CEQA judicial review procedures established by the Jobs and Economic Improvement Through Environmental Leadership Act (AB 900, Buchanan, Chapter 354, Statutes of 2011). The statute now provides:
- That the Governor must certify a project prior to January 1, 2020, the project must be approved prior to January 1, 2021, and AB 900 sunsets January 1, 2021.
- Requires that a project achieve the LEED gold certification.
- Requires transportation efficiency 15% greater than comparable projects.
- Requires a project applicant to demonstrate compliance with the requirement that generators of commercial solid waste and large amounts of organic waste arrange for recycling services for those materials.
- Requires the courts to resolve CEQA lawsuits on AB 900 projects within 270 days to the extent feasible from the date the certified record of proceedings is filed with the court.
This statute was enacted to provide a set of minimum environmental and community benefit criteria that if achieved by a project would allow consideration as a Leadership Project. The criteria provided under AB 987 is considerably weaker and provides greater relief from the CEQA statutes:
- CEQA Review.
AB 900 requires complete compliance with CEQA environmental impact analysis.
AB 987 Reduces standards for GHG emissions and transportation, sets weaker standards for GHG emissions analysis and transportation analysis and eliminates requirement to assess traffic impacts in the immediately adjacent low-income community.
- Project Definition.
AB 900 requires a clearly defined project to be submitted to Governor for certification.
AB 987 provides that a project can be “any land uses that are consistent with the general plan existing as of January 1, 2019” within a nearly 360 acre area – much more than the 27 acres site proposed for Clippers. Additionally the bill covers not only Clippers project site but another 330 acres of Inglewood and would allow virtually any use in that area.
- Gubernatorial Certification.
AB 900 requires the Governor to certify the project and the Legislature to concur in order to receive the streamlined process.
AB 987 does not require any certification.
- Prevailing wage.
AB 900 requires that all “contractors and subcontractors shall pay to all construction workers employed in the execution of the project at least the general prevailing rate of per diem wages.”
AB 987 does not have this requirement.
- Public Participation.
AB 900 guarantees the public an opportunity to review and comment on the environmental impacts of a project and to participate meaningfully in the development of mitigation measures. AB 900 also includes a 30-day comment period during which the public may submit comments to the Governor and a 30-day comment period for the California Air Resources Board to comment.
AB 987 permits Inglewood to ignore environmental comments made after the close of the EIR public comment period, unless the comments fit within specific exceptions.
- Net Zero GHG Impacts.
AB 900 requires that a project must “not result in any net additional emission of greenhouse gases…”
AB 987 has no requirement to be GHG neutral. Instead AB 987requires “to maximize public health, environmental, and employment benefits, the lead agency shall place the highest priority on feasible measures that will reduce the emissions of greenhouse gases in the Inglewood Sports and Entertainment project area and in the neighboring communities of the arena.” Mitigation measures that shall be considered and implemented, if feasible and necessary, to achieve the requirements as specified in the bill.
- Full Legal Remedies.
AB 900 expedites judicial review and requires lawsuits to be concluded within 270 days after the lead agency certifies the administrative record.
AB 987 dramatically limits judicial review of CEQA compliance. Under AB 987, courts may not stop the project’s construction or operation even if the EIR is seriously deficient.
A court only may narrowly limit specific activities (rather than the entire project) that are an “imminent threat to public health” or Native American artifacts.
- LEED Certification.
AB 900 requires the project receive LEED Gold certification.
AB 987 requires LEED gold certification, or its equivalent for the arena project, only. This does not apply to the development on the balance of 360 acres, including the training facility, parking infrastructure, 75,000 square feet of office space, sports medicine clinic, 55,000 square feet of ancillary retail, restaurant, community space and hotel and anything else that might be built within Hollywood Park Specific Plan area.
- Conclusion. As noted above, other sports venues have abided by CEQA and still were able to successfully build stadiums and arenas. In fact, over half of the sports venues that sought ways around CEQA failed or were delayed for reasons other than CEQA.
In addition, the LA Clippers will be playing unitl 2024 at its current location, Staples Center, which gives the lead agency ample time to conduct an environmental review.
Lastly, the particular piece of property for the proposed site of the LA Clippers arena is the subject of pending litigation, MSG Forum v. City of Inglewood.
Considering the issues raised above, the Committee may wish to consider whether this bill is prudent or whether it would be more appropriate for the City of Inglewood, as the lead agency of the proposed arena for the Los Angeles Clippers, consider applying for the AB 900 process when it has more of a plan put together, as was specifically provided for other similar projects.
Related/Prior Legislation
AB 734 (Bonta, 2018) Establishes specified administrative and judicial review procedures for the administrative and judicial review of the EIR and approvals granted for a project related to the development of a “Oakland Sports and Mixed-Use Project” in the City of Oakland meeting certain requirements. This bill is set to be heard in the Senate Environmental Quality Committee on June 20, 2018.
SB 789 (Bradford, 2017) exempts from the California Environmental Quality Act (CEQA) transportation projects related to the 2028 Los Angeles Olympic Games, as well as a fixed guideway transportation project within the Inglewood Sports and Entertainment Project (ISEP). Limits CEQA review and expedites judicial review of a basketball arena and other related projects within the ISEP. Authorizes the City of Inglewood to commence an eminent domain action against properties within the ISEP prior to completing CEQA review. This bill failed passage in the Assembly Natural Resources Committee.
DOUBLE REFERRAL:
If this measure is approved by the Senate Environmental Quality Committee, the do pass motion must include the action to re-refer the bill to the Senate Judiciary Committee.
SOURCE:
Author
SUPPORT:
American Federation of State, County and Municipal Employees
California Conference of Carpenters
California Nevada Conference of Operating Engineers
California Pipe Trades Council
California State Association of Electrical Workers
California Teamsters
Western States Council of Sheet Metal Workers
OPPOSITION:
Inglewood Residents Against Takings and Evictions
Judicial Council of California
Sierra Club
-- END --
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB |
THIRD READING
Bill No: AB 987
:
SENATE GOVERNMENTAL ORG. COMMITTEE: 10-0, 6/13/17
AYES: Dodd, Cannella, Galgiani, Glazer, Hill, Hueso, Lara, Mendoza, Portantino, Vidak
NO VOTE RECORDED: Berryhill, Bradford, Gaines
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 76-0, 5/4/17 (Consent) - See last page for vote
DIGEST: This bill increases the membership of the Gaming Policy Advisory Committee (GPAC) from 10 to 12 members.
ANALYSIS:
Existing law:
- Provides, under the Gambling Control Act, for the licensures and regulation of various legalized gambling activities and establishments by the California Gambling Control Commission (CGCC) and the investigation and enforcement of those activities and establishments by the Department of Justice (DOJ).
- Requires the CGCC to establish a 10-member GPAC for the purpose of discussing matters of controlled gambling regulatory policy and other relevant gambling-related issues.
- Requires GPAC to be composed of controlled gambling licenses and members of the general public in equal numbers.
- Requires the executive director of the CGCC to, from time to time, convene GPAC.
- Requires GPAC to present its recommendations to the CGCC, but shall be deemed advisory and not binding.
- Prohibits GPAC to advise the CGCC on Indian gaming.
This bill:
- Increases the membership of the GPAC from 10 to 12 members.
- Requires GPAC to be composed of five representatives of controlled gambling licensees, five members of the general public, and two representatives from DOJ.
Background
Purpose of the bill. According to the author’s office, “AB 987 would expand the membership of GPAC from 10 to 12 members, and would instead require GPAC to be composed of five representatives of controlled gambling licensees, five members of the general public, and two representatives from DOJ. By expanding the membership to include the two additional seats this bill will also allow for greater representation from law enforcement.”
Gaming Policy Advisory Committee. The stated mission statement for GPAC is to “provide advisory recommendations to the CGCC concerning matters of controlled gaming regulatory policy and other relevant gambling related issues, with special attention to guaranteeing the integrity of gambling operations and to deal effectively with problem gambling.”
The current make-up of GPAC is as follows: One member is a representative of DOJ, one member is a representative of the problem gambling field, one member is a representative of a licensed or registered Third Party Provider of Proposition Player Services, two members are representatives of larger (25 tables or more) licensed gambling establishments, two members are representatives of small (less than 25 tables) licensed gambling establishments, one member is a law enforcement officer/investigator from local government where an approved ordinance allows controlled gaming, one member is a professional with an accounting background and one member is a member of the general public at large.
Related/Prior Legislation
AB 654 (Hall, 2013) would have required GPAC to meet at least twice a year and would have required the CGCC to consult with the GPAC on recommended proposed regulations, as specified. (Amended in the Senate Governmental Organization Committee to deal with an agricultural issue)
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
None received
OPPOSITION: (Verified 6/27/17)
None received
ASSEMBLY FLOOR: 76-0, 5/4/17
AYES: Acosta, Aguiar-Curry, Arambula, Baker, Berman, Bloom, Bocanegra, Bonta, Brough, Burke, Caballero, Calderon, Cervantes, Chau, Chávez, Chen, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Dababneh, Dahle, Daly, Eggman, Flora, Fong, Frazier, Friedman, Gallagher, Eduardo Garcia, Gipson, Gloria, Gomez, Gonzalez Fletcher, Gray, Grayson, Harper, Holden, Irwin, Jones-Sawyer, Kalra, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Mullin, Muratsuchi, Nazarian, Obernolte, O'Donnell, Quirk, Quirk-Silva, Reyes, Ridley-Thomas, Rodriguez, Rubio, Salas, Santiago, Steinorth, Mark Stone, Thurmond, Ting, Voepel, Waldron, Weber, Wood, Rendon
NO VOTE RECORDED: Travis Allen, Bigelow, Cristina Garcia, Patterson
6/27/17 16:28:40
**** END ****
SENATE COMMITTEE ON GOVERNMENTAL ORGANIZATION
Senator Bill Dodd
Chair
2017 - 2018 Regular
Bill No: 987 Hearing Date: 6/13/2017
Author: | |||
Version: | 2/16/2017 Introduced | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Felipe Lopez | ||
SUBJECT: Gaming Policy Advisory Committee
DIGEST: This bill increases the membership of the Gaming Policy Advisory Committee (GPAC) from 10 to 12 members.
ANALYSIS:
Existing law:
- Provides, under the Gambling Control Act (Act), for the licensures and regulation of various legalized gambling activities and establishments by the California Gambling Control Commission (CGCC) and the investigation and enforcement of those activities and establishments by the Department of Justice (DOJ).
- Requires the CGCC to establish a 10-member GPAC for the purpose of discussing matters of controlled gambling regulatory policy and other relevant gambling-related issues.
- Requires GPAC to be composed of controlled gambling licenses and members of the general public in equal numbers.
- Requires the executive director of the CGCC to, from time to time, convene GPAC.
- Requires GPAC to present its recommendations to the CGCC, but shall be deemed advisory and not binding.
- Prohibits GPAC to advise the CGCC on Indian gaming.
This bill:
- Increases the membership of the GPAC from 10 to 12 members.
- Requires GPAC to be composed of five representatives of controlled gambling licensees, five members of the general public, and two representatives from DOJ.
Background
Purpose of the bill. According to the author’s office, “AB 987 would expand the membership of GPAC from 10 to 12 members, and would instead require GPAC to be composed of five representatives of controlled gambling licensees, five members of the general public, and two representatives from DOJ. By expanding the membership to include the two additional seats this bill will also allow for greater representation from law enforcement.”
Gambling Control Act. Prior to 1998, California's gambling industry was essentially unregulated. In 1984, the Legislature enacted the "Gaming Registration Act," which required the Attorney General's office to provide uniform, minimum regulation of California card rooms. However, the scope of the Attorney General's authority was extremely limited and funding was inadequate. Recognizing the need for broader oversight of California's gambling industry, the Legislature enacted the Gambling Control Act in 1997.
The Act provides CGCC with jurisdiction over the operation of gambling establishments in California. The Act requires every owner, lessee, or employee of a gambling establishment to obtain and maintain a valid state gambling license and assigns CGCC the responsibility of assuring that gambling licenses are not issued to, or held by, unqualified or disqualified persons, or by persons whose operations are conducted in a manner that is harmful to the public health, safety, or welfare.
The Act directs CGCC to issue licenses only to those persons of good character, honesty, and integrity, whose prior activities, criminal record, reputation, habits, and associations do not pose a threat to the public interest of this state. The Bureau of Gambling Control, within DOJ, conducts background and field investigations, and enforces the provisions of the Act in this regard.
Gaming Policy Advisory Committee. The stated mission statement for GPAC is to “provide advisory recommendations to the CGCC concerning matters of controlled gaming regulatory policy and other relevant gambling related issues, with special attention to guaranteeing the integrity of gambling operations and to deal effectively with problem gambling.”
The current make-up of GPAC is as follows: One member is a representative of DOJ, one member is a representative of the problem gambling field, one member is a representative of a licensed or registered Third Party Provider of Proposition Player Services, two members are representatives of larger (25 tables or more) licensed gambling establishments, two members are representatives of small (less than 25 tables) licensed gambling establishments, one member is a law enforcement officer/investigator from local government where an approved ordinance allows controlled gaming, one member is a professional with an accounting background and one member is a member of the general public at large.
Prior/Related Legislation
AB 701 (Garcia, 2016) would have made changes to the membership of GPAC. (Amended in Senate Governmental Organization Committee to deal with a public safety issue)
AB 654 (Hall, 2013) would have required GPAC to meet at least twice a year and would require the CGCC to consult with the GPAC on recommended proposed regulations, as specified. (Amended in Senate Governmental Organization Committee to deal with an agricultural issue)
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
None received
OPPOSITION:
None received
Date of Hearing: April 26, 2017
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez Fletcher, Chair
ABPCA Bill Id:AB 987
Author:(Cristina Garcia) – As Introduced Ver:February 16, 2017
Policy Committee: | Governmental Organization | Vote: | 20 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill modifies the Gambling Control Act to increase the membership of the Gaming Policy Advisory Committee (GPAC), an advisory committee to the Gambling Control Commission (GCC), from 10 to 12 members as well as prescribe the composition of the membership to be: 5 representatives of controlled gambling licensees; 5 representatives of the general public; and 2 representatives from the Department of Justice's Bureau of Gambling Control (DOJ).
FISCAL EFFECT:
Minor and absorbable costs to the GCC and DOJ.
COMMENTS:
- Purpose. According to the author, AB 987 is intended to codify the important role of DOJ in the GPAC.
- Gaming Policy Advisory Committee. The GPAC was created to provide advisory recommendations to the GCC concerning matters of controlled gaming regulatory policy and other relevant gambling-related issues, including the integrity of gambling operations and controlling problem gambling. The Gambling Control Act presently requires the GPAC to consist of 10 members, with 5 representatives from controlled gambling licensees and 5 representatives from the general public.
Current GPAC membership includes one representative from the DOJ, one representative expert in problem gambling, one representative from law enforcement, one accountant, one other member of the public, and five representatives of controlled gambling licensees.
- Related legislation. AB 701 (Garcia), of the 2015-16 Legislative Session, was similar to this bill, but it was gut-and amended in the Senate Governmental Organization Committee.
Analysis Prepared by: Luke Reidenbach / APPR. / (916) 319-2081
Date of Hearing: March 29, 2017
ASSEMBLY COMMITTEE ON GOVERNMENTAL ORGANIZATION
Adam Gray, Chair
ABPCA Bill Id:AB 987 (
Author:Cristina Garcia) – As Introduced Ver:February 16, 2017
SUBJECT: Gaming Policy Advisory Committee
SUMMARY: Makes changes to the membership of the Gaming Policy Advisory Committee (GPAC). Specifically, this bill:
- Increases the membership of GPAC from 10 to 12 members.
- Requires GPAC to be composed of 5 representatives of controlled gambling licensees, 5 members of the general public, and 2 representatives from the Department of Justice.
EXISTING LAW:
1) Establishes within the Gambling Control Act (Act) a regulatory framework for gaming in California, creating the California Gambling Control Commission (CGCC) with the authority to approve deny, revoke, or suspend gambling licenses and permits for reasonable cause.
2) Establishes a 10-member GPAC, composed of representatives of controlled gambling licensees and members of the general public in equal numbers.
- Requires the executive director of the CGCC to periodically convene the GPAC to discuss recommended controlled gambling regulatory policy.
- Requires recommendations concerning gambling policy made by the GPAC shall be presented to the CGCC.
- Provides that the GPAC may not advise the CGCC on Indian gaming.
FISCAL EFFECT: Unknown
COMMENTS:
Purpose of the Bill: According to the Author’s Office, “AB 987 is intended to codify the important role of the Department of Justice on the Gaming Policy Advisory Committee (GPAC.) This Advisory committee currently consists of 5 members rep-resenting controlled gaming and 5 members of the general public. Current membership also includes law enforcement and a member from the Bureau of Gaming Control. The role of both DOJ and the Commission has proven to be very beneficial in determining the scope and authority of the Advisory Committee and in advising on upcoming issues to be considered by the committee.”
Background: The Act, established in 1998, created a comprehensive scheme for statewide regulation of legal gambling under a bifurcated system of administration involving the Bureau of Gambling Control (Bureau) within the Attorney General’s Office and the five-member CGCC appointed by the Governor. The CGCC is authorized to establish minimum regulatory standards for the gambling industry and to ensure that the state gambling licenses are not issued to or held by unsuitable or unqualified individuals. CGCC is also charged with establishing and convening the GPAC.
The Bureau monitors the conduct of gaming operations to ensure compliance with state gambling laws and conducts extensive background investigations of applicants seeking a state gambling license. The Bureau also conducts background checks for all key employees and state gambling license and vendor applications.
The Bureau inspects premises where gambling is conducted, examines gambling equipment, audits papers, books, and records of the gambling establishment, investigates suspected violations of gambling laws, and is ultimately responsible for enforcing compliance with all state laws pertaining to gambling.
GPAC: The stated mission statement for GPAC is to provide advisory recommendations to the CGCC concerning matters of controlled gaming regulatory policy and other relevant gambling related issues, with special attention to guaranteeing the integrity of gambling operations and to deal effectively with problem gambling.
Current make-up of GPAC is as follows: One member is a representative of DOJ, one member is a representative of the problem gambling field, one member is a representative of a licensed or registered Third Party Provider of Proposition Player Services, two members are a representative of larger (25 tables or more) licensed gambling establishments, two members are a representative of small (less than 25 tables) licensed gambling establishments, one member is a law enforcement officer/investigator from local government where an approved ordinance allows controlled gaming, one member is a professional with an accounting background and one member is a member of the general public at large.
Prior/Related Legislation: AB 701 (Garcia), 2015-2016 Legislative Session. Would have made changes to the membership of GPAC. The bill was gutted and amended in the Senate Governmental Organization Committee.
AB 654 (Hall), 2013-2014 Legislative Session. Would have required GPAC to meet at least twice a year and would require the CGCC to consult with the GPAC on recommended proposed regulations, as specified. The bill was gutted and amended in the Senate Governmental Organization Committee.
AB 1290 (Lara), 2011-2012 Legislative Session. Would have required the GPAC to meet twice a year. The bill was gutted an amended on the Senate floor.
SB 8 (Lockyer), Chapter 867, Statutes of 1997. Repealed the Gaming Regulation Act and enacted the Gambling Control Act of 1997. Established CGCC and charged it with, among other things, the authority to issue, deny, revoke, suspend, or impose conditions, restrictions, or limitations on licenses, permits, or approvals to ensure that unsuitable or unqualified persons are not involved in the operation of gambling. Furthermore, established the Bureau of Gambling Control (formerly known as the Division of Gambling Control) within the DOJ and charged it with specified investigative and enforcement duties.
REGISTERED SUPPORT / OPPOSITION:
Support
None on file
Opposition
None on file
Analysis Prepared by: Kenton Stanhope / G.O. / (916) 319-2531
Discussed in Hearing
Assembly Standing Committee on Natural Resources
Senate Floor
Assembly Floor
Senate Standing Committee on Appropriations
Senate Standing Committee on Appropriations
Senate Standing Committee on Judiciary
Senate Standing Committee on Governmental Organization
Assembly Standing Committee on Governmental Organization
Bill Author
Bill Co-Author(s):