SB 1131: Electrical and gas corporations: energy efficiency: financing options: industrial and agricultural processes: custom projects.
- Session Year: 2017-2018
- House: Senate
- Latest Version Date: 2018-09-19
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), by March 1, 2010, to establish a regulatory proceeding to develop and implement a comprehensive program to achieve greater energy savings in Californias existing residential and nonresidential building stock. Existing law requires the PUC to investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed by the Energy Commission. Existing law requires the PUC, by September 1, 2016, to authorize electrical corporations and gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings, as specified, and to authorize electrical corporations and gas corporations to recover the reasonable costs of those programs in rates. Existing law requires the PUC to authorize electrical corporations and gas corporations to count all energy savings achieved through the authorized programs, unless determined otherwise, toward overall energy efficiency goals or targets established by the PUC and authorizes the PUC to adjust the energy efficiency goals or targets of electrical corporations and gas corporations to reflect the estimated change in energy savings resulting from those programs.
This bill would delete the language explicitly authorizing recovery in rates for the costs of those programs. Commencing July 1, 2019, this bill would require the PUC to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase energy efficiency, pursuant to separate procedures applicable only to custom projects and other custom programs for industrial, agricultural, commercial, residential, and public sector customers. The bill would require the PUC to develop and maintain rules for custom energy efficiency projects that include eligibility criteria and other metrics for determining whether a project is eligible for funding pursuant to the program, and sets forth procedural requirements for the adoption and revision of the criteria or metrics. The bill would require that the criteria or metrics operate prospectively and be applied uniformly and consistently by each electrical corporation and gas corporation. The bill would require each electrical corporation and gas corporation to maintain a custom measure project archive and would require the PUC to develop and maintain requirements for what information is to be included in the archive, including information required to support the applications of customers custom energy efficiency projects. Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the bill would require the PUC to make a determination of whether the application has been selected for review within 15 days and to notify the electrical corporation or gas corporation of its decision. The bill would require that the review of a proposed project be concluded within 30 business days from when the project documentation is received by the commission, unless the commission determines the supporting information is incomplete and inaccurate. If, as a result of the review, the PUC rejects the proposed project or requests modification of the project, the bill would require the PUC to notify the electrical corporation or gas corporation of the reasons for the rejection or request for modification, including each basis as to why the project is rejected or modification is requested, and would require the PUC to make specific recommendations for the conditions under which the project would be approved. The bill would provide that for projects that were not reviewed, an electrical corporation or gas corporation may rely on its project application review process to determine the forecast energy savings values for the project based on rules adopted by the commission, and base the final customer incentive payment and contractor pay-for-performance payment on postinstallation measurement and verification results. The bill would authorize the PUC to employ postinstallation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill are within the act and require action by the PUC to implement its requirements, a violation of these provisions would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), by March 1, 2010, to establish a regulatory proceeding to develop and implement a comprehensive program to achieve greater energy savings in Californias existing residential and nonresidential building stock. Existing law requires the PUC to investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed by the Energy Commission. Existing law requires the PUC, by September 1, 2016, to authorize electrical corporations and gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings, as specified, and to authorize electrical corporations and gas corporations to recover the reasonable costs of those programs in rates. Existing law requires the PUC to authorize electrical corporations and gas corporations to count all energy savings achieved through the authorized programs, unless determined otherwise, toward overall energy efficiency goals or targets established by the PUC and authorizes the PUC to adjust the energy efficiency goals or targets of electrical corporations and gas corporations to reflect the estimated change in energy savings resulting from those programs.
This bill would delete the language explicitly authorizing recovery in rates for the costs of those programs. Commencing July 1, 2019, this bill would require the PUC to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase energy efficiency, pursuant to separate procedures applicable only to custom projects and other custom programs for industrial, agricultural, commercial, residential, and public sector customers. The bill would require the PUC to develop and maintain rules for custom energy efficiency projects that include eligibility criteria and other metrics for determining whether a project is eligible for funding pursuant to the program, and sets forth procedural requirements for the adoption and revision of the criteria or metrics. The bill would require that the criteria or metrics operate prospectively and be applied uniformly and consistently by each electrical corporation and gas corporation. The bill would require each electrical corporation and gas corporation to maintain a custom measure project archive and would require the PUC to develop and maintain requirements for what information is to be included in the archive, including information required to support the applications of customers custom energy efficiency projects. Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the bill would require the PUC to make a determination of whether the application has been selected for review within 15 days and to notify the electrical corporation or gas corporation of its decision. The bill would require that the review of a proposed project be concluded within 30 business days from when the project documentation is received by the commission, unless the commission determines the supporting information is incomplete and inaccurate. If, as a result of the review, the PUC rejects the proposed project or requests modification of the project, the bill would require the PUC to notify the electrical corporation or gas corporation of the reasons for the rejection or request for modification, including each basis as to why the project is rejected or modification is requested, and would require the PUC to make specific recommendations for the conditions under which the project would be approved. The bill would provide that for projects that were not reviewed, an electrical corporation or gas corporation may rely on its project application review process to determine the forecast energy savings values for the project based on rules adopted by the commission, and base the final customer incentive payment and contractor pay-for-performance payment on postinstallation measurement and verification results. The bill would authorize the PUC to employ postinstallation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill are within the act and require action by the PUC to implement its requirements, a violation of these provisions would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), by March 1, 2010, to establish a regulatory proceeding to develop and implement a comprehensive program to achieve greater energy savings in Californias existing residential and nonresidential building stock. Existing law requires the PUC to investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed by the Energy Commission. Existing law requires the PUC, by September 1, 2016, to authorize electrical corporations and gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings, as specified, and to authorize electrical corporations and gas corporations to recover the reasonable costs of those programs in rates. Existing law requires the PUC to authorize electrical corporations and gas corporations to count all energy savings achieved through the authorized programs, unless determined otherwise, toward overall energy efficiency goals or targets established by the PUC and authorizes the PUC to adjust the energy efficiency goals or targets of electrical corporations and gas corporations to reflect the estimated change in energy savings resulting from those programs.
This bill would delete the language explicitly authorizing recovery in rates for the costs of those programs. Commencing July 1, 2019, this bill would require the PUC to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase energy efficiency, pursuant to separate procedures applicable only to custom projects and other custom programs for industrial, agricultural, commercial, residential, and public sector customers. The bill would require the PUC to develop and maintain rules for custom energy efficiency projects that include eligibility criteria and other metrics for determining whether a project is eligible for funding pursuant to the program, and sets forth procedural requirements for the adoption and revision of the criteria or metrics. The bill would require that the criteria or metrics operate prospectively and be applied uniformly and consistently by each electrical corporation and gas corporation. The bill would require each electrical corporation and gas corporation to maintain a custom measure project archive and would require the PUC to develop and maintain requirements for what information is to be included in the archive, including information required to support the applications of customers custom energy efficiency projects. Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the bill would require the PUC to make a determination of whether the application has been selected for review within 15 days and to notify the electrical corporation or gas corporation of its decision. The bill would require that the review of a proposed project be concluded within 30 business days from when the project documentation is received by the commission, unless the commission determines the supporting information is incomplete and inaccurate. If, as a result of the review, the PUC rejects the proposed project or requests modification of the project, the bill would require the PUC to notify the electrical corporation or gas corporation of the reasons for the rejection or request for modification, including each basis as to why the project is rejected or modification is requested, and would require the PUC to make specific recommendations for the conditions under which the project would be approved. The bill would provide that for projects that were not reviewed, an electrical corporation or gas corporation may rely on its project application review process to determine the forecast energy savings values for the project based on rules adopted by the commission, and base the final customer incentive payment and contractor pay-for-performance payment on postinstallation measurement and verification results. The bill would authorize the PUC to employ post-installation postinstallation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill are within the act and require action by the PUC to implement its requirements, a violation of these provisions would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), by March 1, 2010, to establish a regulatory proceeding to develop and implement a comprehensive program to achieve greater energy savings in Californias existing residential and nonresidential building stock. Existing law requires the PUC to investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed by the Energy Commission. Existing law requires the PUC, by September 1, 2016, to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings, as specified, and to authorize electrical corporations and gas corporations to recover the reasonable costs of those programs in rates. Existing law requires the PUC to authorize electrical corporations and gas corporations to count all energy savings achieved through the authorized programs, unless determined otherwise, toward overall energy efficiency goals or targets established by the PUC and authorizes the PUC to adjust the energy efficiency goals or targets of electrical corporations and gas corporations to reflect the estimated change in energy savings resulting from those programs.
This bill would delete the language explicitly authorizing recovery in rates for the costs of those programs. Commencing July 1, 2019, this bill would require the PUC to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase energy efficiency, pursuant to separate procedures applicable only to custom projects and other custom programs for industrial, agricultural, commercial, residential, and public sector customers. The bill would require the PUC to develop and maintain rules for custom energy efficiency projects that include eligibility criteria or and other metrics for determining whether a project is eligible for funding pursuant to the program, and sets forth procedural requirements for the adoption and revision of the criteria or metrics. The bill would require that the criteria or metrics operate prospectively. prospectively and be applied uniformly and consistently by each electrical and gas corporation. The bill would require each electrical corporation and gas corporation to maintain a customer custom measure project archive and would require the PUC to develop and maintain requirements for what information is to be included in the archive, including information relative to preapplication-stage and application-stage customer required to support the applications of customers custom energy efficiency projects. Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the bill would require the PUC to make a determination of whether the application has been selected for review within 30 15 days and to notify the electrical corporation or gas corporation of its decision. The bill would require that the preinstallation review of a proposed project be concluded within 30 business days from when the project is selected for review. documentation is received by the commission, unless the commission determines the supporting information is incomplete and inaccurate. If, as a result of the review, the PUC rejects the proposed project or requests modification of the project, the bill would require the PUC to notify the electrical corporation or gas corporation and the project applicant of the reasons for the rejection or request for modification, including each basis as to why the project is inconsistent with the eligibility criteria or metrics, rejected or modification is requested, and would require the PUC to make specific recommendations for the conditions under which the project would be approved. The bill would provide that for projects that were not reviewed, were approved following review, or that were operationally approved, as specified, an electrical corporation or gas corporation may rely on its project application review process to determine the forecast energy savings values submitted or approved for the project when entering into estimated incentive agreements for the project and in any subsequent energy savings claims before the PUC. for the project based on rules adopted by the commission, and base the final customer incentive payment and contractor pay-for-performance payment on postinstallation measurement and verification results. The bill would authorize the PUC to employ post-installation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill are within the act and require action by the PUC to implement its requirements, a violation of these provisions would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), by March 1, 2010, to establish a regulatory proceeding to develop and implement a comprehensive program to achieve greater energy savings in Californias existing residential and nonresidential building stock. Existing law requires the PUC to investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed by the Energy Commission. Existing law requires the PUC, by September 1, 2016, to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings, as specified, and to authorize electrical corporations and gas corporations to recover the reasonable costs of those programs in rates. Existing law requires the PUC to authorize electrical corporations and gas corporations to count all energy savings achieved through the authorized programs, unless determined otherwise, toward overall energy efficiency goals or targets established by the PUC and authorizes the PUC to adjust the energy efficiency goals or targets of electrical corporations and gas corporations to reflect the estimated change in energy savings resulting from those programs.
This bill would delete the language explicitly authorizing recovery in rates for the costs of those programs. Commencing July 1, 2019, this bill would require the PUC to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase energy efficiency, pursuant to separate procedures applicable only to custom projects and other custom programs for industrial, agricultural, commercial, residential, and public sector customers. The bill would require the PUC to develop and maintain eligibility criteria or other metrics for determining whether a project is eligible for funding pursuant to the program, and sets forth procedural requirements for the adoption and revision of the criteria or metrics. The bill would require that the criteria or metrics operate prospectively. The bill would require each electrical corporation and gas corporation to maintain a customer measure project archive and would require the PUC to develop and maintain requirements for what information is to be included in the archive, including information relative to preapplication-stage and application-stage customer energy efficiency projects. Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the bill would require the PUC to make a determination of whether the application has been selected for review within 30 days and to notify the electrical corporation or gas corporation of its decision. The bill would require that the preinstallation review of a proposed project be concluded within 30 days from when the project is selected for review. If, as a result of the review, the PUC rejects the proposed project or requests modification of the project, the bill would require the PUC to notify the electrical corporation or gas corporation and the project applicant of the reasons for the rejection or request for modification, including each basis as to why the project is inconsistent with the eligibility criteria or metrics, and would require the PUC to make specific recommendations for the conditions under which the project would be approved. The bill would provide that for projects that were not reviewed, were approved following review, or that were operationally approved, as specified, an electrical corporation or gas corporation may rely on the forecast energy savings values submitted or approved for the project when entering into estimated incentive agreements for the project and in any subsequent energy savings claims before the PUC. The bill would authorize the PUC to employ post-installation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill are within the act and require action by the PUC to implement its requirements, a violation of these provisions would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), by March 1, 2010, to establish a regulatory proceeding to develop and implement a comprehensive program to achieve greater energy savings in Californias existing residential and nonresidential building stock. Existing law requires the PUC to investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed by the Energy Commission. Existing law requires the PUC, by September 1, 2016, to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings, as specified, and to authorize electrical corporations and gas corporations to recover the reasonable costs of those programs in rates. Existing law requires the PUC to authorize electrical corporations and gas corporations to count all energy savings achieved through the authorized programs, unless determined otherwise, toward overall energy efficiency goals or targets established by the PUC and authorizes the PUC to adjust the energy efficiency goals or targets of electrical corporations and gas corporations to reflect the estimated change in energy savings resulting from those programs.
Commencing July 1, 2019, this bill would require the PUC to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase energy efficiency, pursuant to separate procedures applicable only to custom projects and other custom programs for industrial and agricultural processes, facilities, systems, and equipment. industrial, agricultural, commercial, residential, and public sector customers. The bill would require the energy division of the PUC to develop and maintain eligibility criteria or other metrics for determining whether a project is eligible for funding pursuant to the program, and sets forth procedural requirements for the adoption and revision of the criteria or metrics. The bill would require that the criteria or metrics operate prospectively. The bill would require each electrical corporation and gas corporation to maintain a customer measure project archive and would require the energy division PUC to develop and maintain requirements for what information is to be included in the archive, including information relative to preapplication-stage and application-stage customer energy efficiency projects. Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the bill would require the energy division PUC to make a determination of whether the application has been selected for review within 30 days and to notify the electrical corporation or gas corporation of its decision. The bill would require that the preinstallation review of a proposed project be concluded within 60 30 days from when the project is selected for review. If, as a result of the review, the energy division PUC rejects the proposed project or requests modification of the project, the bill would require the energy division PUC to notify the electrical corporation or gas corporation and the project applicant of the reasons for the rejection or request for modification, including each basis as to why the project is inconsistent with the eligibility criteria or metrics, and would require the energy division PUC to make specific recommendations for the conditions under which the project would be approved. The bill would provide that for projects that were not reviewed, were approved following review, or that were operationally approved, as specified, an electrical corporation or gas corporation may rely on the forecast energy savings values submitted or approved for the project when entering into estimated incentive agreements for the project and in any subsequent energy savings claims before the PUC. The bill would authorize the PUC to employ post-installation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission PUC is a crime.
Because the provisions of this bill are within the act and require action by the commission PUC to implement its requirements, a violation of these provisions would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), by March 1, 2010, to establish a regulatory proceeding to develop and implement a comprehensive program to achieve greater energy savings in Californias existing residential and nonresidential building stock. Existing law requires the PUC to investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed by the Energy Commission. Existing law requires the PUC, by September 1, 2016, to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings, as specified, and to authorize electrical corporations and gas corporations to recover the reasonable costs of those programs in rates. Existing law requires the PUC to authorize electrical corporations and gas corporations to count all energy savings achieved through the authorized programs, unless determined otherwise, toward overall energy efficiency goals or targets established by the PUC and authorizes the PUC to adjust the energy efficiency goals or targets of electrical corporations and gas corporations to reflect the estimated change in energy savings resulting from those programs.
Commencing July 1, 2019, this bill would require the PUC to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase energy efficiency, pursuant to separate procedures applicable only to custom projects and other programs for industrial and agricultural processes, facilities, systems, and equipment. The bill would require the energy division of the PUC to develop and maintain eligibility criteria or other metrics for determining whether a project is eligible for funding pursuant to the program, and sets forth procedural requirements for the adoption and revision of the criteria or metrics. The bill would require that the criteria or metrics operate prospectively. The bill would require each electrical corporation and gas corporation to maintain a customer measure project archive and would require the energy division to develop and maintain requirements for what information is to be included in the archive, including information relative to preapplication-stage and application-stage customer energy efficiency projects. Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the bill would require the energy division to make a determination of whether the application has been selected for review within 21 30 days and to notify the electrical corporation or gas corporation of its decision. The bill would require that the preinstallation review of a proposed project be concluded within 30 60 days from when the project is selected for review. If, as a result of the review, the energy division rejects the proposed project or requests modification of the project, the bill would require the energy division to notify the electrical corporation or gas corporation and the project applicant of the reasons for the rejection or request for modification, including each basis as to why the project is inconsistent with the eligibility criteria or metrics, and would require the energy division to make specific recommendations for the conditions under which the project would be approved. The bill would provide that for projects that were not reviewed, were approved following review, or that were operationally approved, as specified, an electrical corporation or gas corporation may rely on the forecast energy savings values submitted or approved for the project when entering into estimated incentive agreements for the project and in any subsequent energy savings claims before the PUC. The bill would authorize the PUC to employ post-installation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill are within the act and require action by the commission to implement its requirements, a violation of these provisions would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), by March 1, 2010, to establish a regulatory proceeding to develop and implement a comprehensive program to achieve greater energy savings in Californias existing residential and nonresidential building stock. Existing law requires the PUC to investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed by the Energy Commission. Existing law requires the PUC, by September 1, 2016, to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings, as specified, and to authorize electrical corporations and gas corporations to recover the reasonable costs of those programs in rates. Existing law requires the PUC to authorize electrical corporations and gas corporations to count all energy savings achieved through the authorized programs, unless determined otherwise, toward overall energy efficiency goals or targets established by the PUC and authorizes the PUC to adjust the energy efficiency goals or targets of electrical corporations and gas corporations to reflect the estimated change in energy savings resulting from those programs.
Commencing July 1, 2019, this bill would require the PUC to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase energy efficiency, pursuant to separate procedures applicable only to custom projects and other programs for industrial and agricultural processes, facilities, systems, and equipment. The bill would require the energy division of the PUC to develop and maintain eligibility criteria or other metrics for determining whether a project is eligible for funding pursuant to the program, and sets forth procedural requirements for the adoption and revision of the criteria or metrics. The bill would require that the criteria or metrics operate prospectively. The bill would require each electrical corporation and gas corporation to maintain a customer measure project archive and would require the energy division to develop and maintain requirements for what information is to be included in the archive, including information relative to preapplication-stage and application-stage customer energy efficiency projects. Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the bill would require the energy division to make a determination of whether the application has been selected for review within 21 days and to notify the electrical corporation or gas corporation of its decision. The bill would require that the preinstallation review of a proposed project be concluded within 30 days from when the project is selected for review. The bill would require that if If, as a result of the review, the energy division rejects the proposed project or requests modification of the project, the bill would require the energy division to notify the electrical corporation or gas corporation and the project applicant of the reasons for the rejection or request for modification, including each basis as to why the project is inconsistent with the eligibility criteria or metrics, and would require the energy division to make specific recommendations for the conditions under which the project would be approved. The bill would provide that for projects that were not reviewed, were approved following review, or that were operationally approved, as specified, an electrical corporation or gas corporation may rely on the forecast energy savings values submitted or approved for the project when entering into estimated incentive agreements for the project and in any subsequent energy savings claims before the PUC. The bill would authorize the PUC to employ post-installation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill are within the act and require action by the commission to implement its requirements, a violation of these provisions would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), by March 1, 2010, to establish a regulatory proceeding to develop and implement a comprehensive program to achieve greater energy savings in Californias existing residential and nonresidential building stock. Existing law requires the PUC to investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed by the Energy Commission. Existing law requires the PUC, by September 1, 2016, to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings, as specified, and to authorize electrical corporations and gas corporations to recover the reasonable costs of those programs in rates. Existing law requires the PUC to authorize electrical corporations and gas corporations to count all energy savings achieved through the authorized programs, unless determined otherwise, toward overall energy efficiency goals or targets established by the PUC and authorizes the PUC to adjust the energy efficiency goals or targets of electrical corporations and gas corporations to reflect the estimated change in energy savings resulting from those programs.
Commencing July 1, 2019, this bill would require the PUC to authorize electrical corporations and gas corporations to provide incentives, rebates, technical assistance, and support to their customers to increase energy efficiency, pursuant to separate procedures applicable only to custom projects and other programs for industrial and agricultural processes, facilities, systems, and equipment. The bill would require the energy division of the PUC to develop and maintain eligibility criteria or other metrics for determining whether a project is eligible for funding pursuant to the program, and sets forth procedural requirements for the adoption and revision of the criteria or metrics. The bill would require that the criteria or metrics operate prospectively. The bill would require each electrical corporation and gas corporation to maintain a customer measure project archive and would require the energy division to develop and maintain requirements for what information is to be included in the archive, including information relative to preapplication-stage and application-stage customer energy efficiency projects. Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the bill would require the energy division to make a determination of whether the application has been selected for review within 21 days and to notify the electrical corporation or gas corporation of its decision. The bill would require that the preinstallation review of a proposed project be concluded within 30 days from when the project is selected for review. The bill would require that if as a result of the review, the energy division rejects the proposed project or requests modification of the project, the bill would require the energy division to notify the electrical corporation or gas corporation and the project applicant of the reasons for the rejection or request for modification, each basis as to why the project is inconsistent with the eligibility criteria or metrics, and make specific recommendations for the conditions under which the project would be approved. The bill would provide that for projects that were not reviewed, were approved following review, or that were operationally approved, as specified, an electrical corporation or gas corporation may rely on the forecast energy savings values submitted or approved for the project when entering into estimated incentive agreements for the project and in any subsequent energy savings claims before the PUC. The bill would authorize the PUC to employ post-installation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill are within the act and require action by the commission to implement its requirements, a violation of these provisions would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(a)(1)The commission shall investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed pursuant to Section 25943 of the Public Resources Code.
(2)It is the intent of the Legislature that the commission implement this section by establishing applicable rules, within a reasonable period of time and in an open process, that are clear and operate on a prospective basis.
(b)Recognizing the already underway 2015 commission work to adopt efficiency potential and goals, the Energy Commission work on its 2015 energy demand forecast, and the need to determine how to incorporate meter-based performance into determinations of goals, portfolio cost-effectiveness, and authorized budgets, the commission, in a separate or existing proceeding, shall, by September 1, 2016, authorize electrical corporations or gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings based on all estimated energy savings and energy usage reductions, taking into consideration the overall reduction in normalized metered energy consumption as a measure of energy savings. Those programs shall include energy usage reductions resulting from the adoption of a measure or installation of equipment required for modifications to existing buildings to bring them into conformity with, or exceed, the requirements of Title 24 of the California Code of Regulations, as well as operational, behavioral, and retrocommissioning activities reasonably expected to produce multiyear savings. The commission shall authorize an electrical corporation and gas corporation to count all energy savings achieved through the authorized programs created by this subdivision, unless determined otherwise, toward overall energy efficiency goals or targets established by the commission. The commission may adjust the energy efficiency goals or targets of an electrical corporation and gas corporation to reflect this change in savings estimation consistent with this subdivision and subdivision (d).
(c)Effective January 1, 2016, electrical corporations and gas corporations are authorized to implement the provisions of subdivision (b) for high opportunity projects or programs. The commission shall provide expedited authorization of high opportunity projects and programs to apply the savings baseline provisions in subdivision (b).
(d)In furtherance of subdivision (b), the commission, in consultation with the Energy Commission, shall consider all of the following:
(1)The results of any interagency baseline assessment.
(2)Any available results from electrical corporation and gas corporation baseline pilot studies ordered in commission Decision 14-10-046 (October 24, 2014), Decision Establishing Energy Efficiency Savings Goals and Approving 2015 Energy Efficiency Programs and Budgets.
(3)Information necessary to ensure consistency with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(e)The commission may direct electrical corporations and gas corporations to make filings that are necessary to ensure coordination with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(f)The commission shall prioritize energy efficiency activities consistent with Sections 454.55 and 454.56.
(g)(1)This subdivision shall impose the operative requirements pursuant to this section for custom projects and other custom programs for industrial, agricultural, commercial, residential, and public sector customers. This subdivision shall become operative on July 1, 2019, and shall apply only to those programs and projects.
(A)The commission shall authorize electrical corporations and gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of industrial, agricultural, commercial, residential, and public sector customers based on nationally recognized measurement and verification standards, such as the International Performance Measurement and Verification Protocol.
(B)All energy savings achieved through the programs authorized pursuant to this subdivision shall count toward the overall energy efficiency goals or targets established by the commission for an electrical corporation, gas corporation, or program administrator.
(C)The commission may adjust the energy efficiency goals or targets of an electrical corporation or gas corporation to reflect a change in the forecast energy savings consistent with this subdivision and subdivision (d).
(2)The commission shall develop and maintain rules for custom energy efficiency projects that include eligibility criteria and other metrics for determining whether a project is eligible for funding pursuant to the program.
(A)The commission shall review and circulate for public review and comment statewide eligibility criteria or metrics at least 30 days prior to changes, including posting on the commissions Internet Web site.
(B)After the initial 30-day period for public review and comment, any changes to the initial proposed eligibility criteria or metrics shall be circulated for public review for not less than 15 days prior to final adoption.
(C)Once eligibility criteria or metrics are adopted, any proposed revision shall be circulated for public review and comment for not less than 30 days prior to a revision. For these purposes, grammatical corrections or other nonsubstantive modifications are not a revision and may be made when the need for the correction or modification is discovered.
(D)Statewide eligibility criteria or metrics shall operate only on a prospective basis, shall be applied uniformly and consistently by each electrical corporation and gas corporation, and shall not be applied retroactively to any pending or approved applications.
(E)Any delay in the adoption of eligibility criteria or metrics past July 1, 2019, shall not be the basis for denial of any application nor a basis to suspend the program.
(3)(A)The rules adopted by the commission for custom energy efficiency projects shall require each electrical corporation and gas corporation to maintain a custom measure project archive. The commission shall develop and maintain requirements for what information is to be included in the custom measure project archive, including information required to support the applications of customers custom energy efficiency projects.
(B)(i)Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the commission shall make a determination of whether the application has been selected for review within 15 days and notify the electrical corporation or gas corporation of its decision to review.
(ii)The electrical corporation or gas corporation shall make the project application supporting documentation available to the commission for review within 15 business days of the commission review selection date. The commission shall develop and maintain requirements for what information is to be included in the custom measure project archive for those customer projects selected for review.
(iii)The commission shall, within 15 days of the submission of a project to the custom measure project archive, promptly notify an electrical corporation or gas corporation of any deficiency in the information supporting an application.
(iv)The review of a proposed project shall be concluded within 30 business days from when the date a projects documentation is received by the commission, unless the commission determines it was provided incomplete or inaccurate supporting information from the electrical corporation or gas corporation, and notifies the electrical corporation and gas corporation of the need for additional review time. The 30 business days will restart from the time complete and accurate documentation, as noted in the notification of deficiencies, is submitted by the electrical corporation or gas corporation. The electrical corporation or gas corporation shall notify the customer applicant within 48 hours of any delays as a result of incomplete or inaccurate supporting project information, or if the commission needs additional review time.
(C)The commission shall notify the electrical corporation or gas corporation of the specific deficiencies in the information supporting an application, including each basis as to why the project is inconsistent with the eligibility criteria and metrics, which may include failure to adequately define the project, make specific recommendations for the conditions under which the project would be approved, and, if the application fails to adequately define the project, identify aspects of the project that require further definition.
(D)If, as a result of the review, the commission rejects the proposed project or requests modification of the project, the commission shall notify the electrical corporation or gas corporation of the reasons for the rejection or request for modification, including each basis as to why the project is rejected or modification is requested, and make specific recommendations for the conditions under which the project would be approved. The electrical corporation or gas corporation shall promptly inform the applicant as to the reasons why the project was rejected and the specific recommendations for the conditions under which the project would be approved.
(E)The commission shall not reject a proposed project or request modification of a project on the basis of inconsistency with eligibility criteria or metrics that were not in effect at the time the project application was submitted.
(F)If any party to the project is unsatisfied with the commissions directions for the project, a dispute resolution process may be initiated by that party. The commission shall adopt rules for the conduct of the dispute resolution process.
(G)If a project is not selected by the commission for review within the period determined pursuant to subparagraph (B), or if a project has not received written direction from the commission within the period specified in clause (iv) of subparagraph (B), the commission shall be deemed to have waived review of the project and the project may proceed as if it had been approved by the commission, but the project shall still be subject to the review of the electrical or gas corporation.
(4)(A)For projects that were not reviewed and did not receive written documentation, as specified in subparagraph (G) of paragraph (3), an electrical corporation or gas corporation may rely on its project application review process to determine the forecast energy savings values for the project based on rules adopted by the commission, and base the final customer incentive payment and contractor pay-for-performance payment on postinstallation measurement and verification results.
(B)The commission may employ postinstallation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
(5)Except as described in paragraph (2), nothing in this subdivision limits the commissions existing authority to evaluate projects or programs for the purpose of prospectively adjusting the projects or programs for industrial and agricultural processes, facilities, systems, and equipment.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)The commission shall investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed pursuant to Section 25943 of the Public Resources Code.
(2)It is the intent of the Legislature that the commission implement this section by establishing applicable rules, within a reasonable period of time and in an open process, that are clear and operate on a prospective basis.
(b)Recognizing the already underway 2015 commission work to adopt efficiency potential and goals, the Energy Commission work on its 2015 energy demand forecast, and the need to determine how to incorporate meter-based performance into determinations of goals, portfolio cost-effectiveness, and authorized budgets, the commission, in a separate or existing proceeding, shall, by September 1, 2016, authorize electrical corporations or gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings based on all estimated energy savings and energy usage reductions, taking into consideration the overall reduction in normalized metered energy consumption as a measure of energy savings. Those programs shall include energy usage reductions resulting from the adoption of a measure or installation of equipment required for modifications to existing buildings to bring them into conformity with, or exceed, the requirements of Title 24 of the California Code of Regulations, as well as operational, behavioral, and retrocommissioning activities reasonably expected to produce multiyear savings. The commission shall authorize an electrical corporation and gas corporation to count all energy savings achieved through the authorized programs created by this subdivision, unless determined otherwise, toward overall energy efficiency goals or targets established by the commission. The commission may adjust the energy efficiency goals or targets of an electrical corporation and gas corporation to reflect this change in savings estimation consistent with this subdivision and subdivision (d).
(c)Effective January 1, 2016, electrical corporations and gas corporations are authorized to implement the provisions of subdivision (b) for high opportunity projects or programs. The commission shall provide expedited authorization of high opportunity projects and programs to apply the savings baseline provisions in subdivision (b).
(d)In furtherance of subdivision (b), the commission, in consultation with the Energy Commission, shall consider all of the following:
(1)The results of any interagency baseline assessment.
(2)Any available results from electrical corporation and gas corporation baseline pilot studies ordered in commission Decision 14-10-046 (October 24, 2014), Decision Establishing Energy Efficiency Savings Goals and Approving 2015 Energy Efficiency Programs and Budgets.
(3)Information necessary to ensure consistency with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(e)The commission may direct electrical corporations and gas corporations to make filings that are necessary to ensure coordination with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(f)The commission shall prioritize energy efficiency activities consistent with Sections 454.55 and 454.56.
(g)(1)This subdivision shall impose the operative requirements pursuant to this section for custom projects and other custom programs for industrial, agricultural, commercial, residential, and public sector customers. This subdivision shall become operative on July 1, 2019, and shall apply only to those programs and projects.
(A)The commission shall authorize electrical corporations and gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of industrial, agricultural, commercial, residential, and public sector customers based on nationally recognized measurement and verification standards, such as the International Performance Measurement and Verification Protocol.
(B)All energy savings achieved through the programs authorized pursuant to this subdivision shall count toward the overall energy efficiency goals or targets established by the commission for an electrical corporation, gas corporation, or program administrator.
(C)The commission may adjust the energy efficiency goals or targets of an electrical corporation or gas corporation to reflect a change in the forecast energy savings consistent with this subdivision and subdivision (d).
(2)The commission shall develop and maintain rules for custom energy efficiency projects that include eligibility criteria and other metrics for determining whether a project is eligible for funding pursuant to the program.
(A)The commission shall review and circulate for public review and comment statewide eligibility criteria or metrics at least 30 days prior to changes, including posting on the commissions Internet Web site.
(B)After the initial 30-day period for public review and comment, any changes to the initial proposed eligibility criteria or metrics shall be circulated for public review for not less than 15 days prior to final adoption.
(C)Once eligibility criteria or metrics are adopted, any proposed revision shall be circulated for public review and comment for not less than 30 days prior to a revision. For these purposes, grammatical corrections or other nonsubstantive modifications are not a revision and may be made when the need for the correction or modification is discovered.
(D)Statewide eligibility criteria or metrics shall operate only on a prospective basis, shall be applied uniformly and consistently by each electrical corporation and gas corporation, and shall not be applied retroactively to any pending or approved applications.
(E)Any delay in the adoption of eligibility criteria or metrics past July 1, 2019, shall not be the basis for denial of any application nor a basis to suspend the program.
(3)(A)The rules adopted by the commission for custom energy efficiency projects shall require each electrical corporation and gas corporation to maintain a custom measure project archive. The commission shall develop and maintain requirements for what information is to be included in the custom measure project archive, including information required to support the applications of customers custom energy efficiency projects.
(B)(i)Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the commission shall make a determination of whether the application has been selected for review within 15 days and notify the electrical corporation or gas corporation of its decision to review.
(ii)The electrical corporation or gas corporation shall make the project application supporting documentation available to the commission for review within 15 business days of the commission review selection date. The commission shall develop and maintain requirements for what information is to be included in the custom measure project archive for those customer projects selected for review.
(iii)The commission shall, within 15 days of the submission of a project to the custom measure project archive, promptly notify an electrical corporation or gas corporation of any deficiency in the information supporting an application.
(iv)The review of a proposed project shall be concluded within 30 business days from when the date a projects documentation is received by the commission, unless the commission determines it was provided incomplete or inaccurate supporting information from the electrical corporation or gas corporation, and notifies the electrical corporation and gas corporation of the need for additional review time. The 30 business days will restart from the time complete and accurate documentation, as noted in the notification of deficiencies, is submitted by the electrical corporation or gas corporation. The electrical corporation or gas corporation shall notify the customer applicant within 48 hours of any delays as a result of incomplete or inaccurate supporting project information, or if the commission needs additional review time.
(C)The commission shall notify the electrical corporation or gas corporation of the specific deficiencies in the information supporting an application, including each basis as to why the project is inconsistent with the eligibility criteria and metrics, which may include failure to adequately define the project, make specific recommendations for the conditions under which the project would be approved, and, if the application fails to adequately define the project, identify aspects of the project that require further definition.
(D)If, as a result of the review, the commission rejects the proposed project or requests modification of the project, the commission shall notify the electrical corporation or gas corporation of the reasons for the rejection or request for modification, including each basis as to why the project is rejected or modification is requested, and make specific recommendations for the conditions under which the project would be approved. The electrical corporation or gas corporation shall promptly inform the applicant as to the reasons why the project was rejected and the specific recommendations for the conditions under which the project would be approved.
(E)The commission shall not reject a proposed project or request modification of a project on the basis of inconsistency with eligibility criteria or metrics that were not in effect at the time the project application was submitted.
(F)If any party to the project is unsatisfied with the commissions directions for the project, a dispute resolution process may be initiated by that party. The commission shall adopt rules for the conduct of the dispute resolution process.
(G)If a project is not selected by the commission for review within the period determined pursuant to subparagraph (B), or if a project has not received written direction from the commission within the period specified in clause (iv) of subparagraph (B), the commission shall be deemed to have waived review of the project and the project may proceed as if it had been approved by the commission, but the project shall still be subject to the review of the electrical or gas corporation.
(4)(A)For projects that were not reviewed and did not receive written documentation, as specified in subparagraph (G) of paragraph (3), an electrical corporation or gas corporation may rely on its project application review process to determine the forecast energy savings values for the project based on rules adopted by the commission, and base the final customer incentive payment and contractor pay-for-performance payment on postinstallation measurement and verification results.
(B)The commission may employ postinstallation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
(5)Except as described in paragraph (2), nothing in this subdivision limits the commissions existing authority to evaluate projects or programs for the purpose of prospectively adjusting the projects or programs for industrial and agricultural processes, facilities, systems, and equipment.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)The commission shall investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed pursuant to Section 25943 of the Public Resources Code.
(2)It is the intent of the Legislature that the commission implement this section by establishing applicable rules, within a reasonable period of time and in an open process, that are clear and operate on a prospective basis.
(b)Recognizing the already underway 2015 commission work to adopt efficiency potential and goals, the Energy Commission work on its 2015 energy demand forecast, and the need to determine how to incorporate meter-based performance into determinations of goals, portfolio cost-effectiveness, and authorized budgets, the commission, in a separate or existing proceeding, shall, by September 1, 2016, authorize electrical corporations or gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings based on all estimated energy savings and energy usage reductions, taking into consideration the overall reduction in normalized metered energy consumption as a measure of energy savings. Those programs shall include energy usage reductions resulting from the adoption of a measure or installation of equipment required for modifications to existing buildings to bring them into conformity with, or exceed, the requirements of Title 24 of the California Code of Regulations, as well as operational, behavioral, and retrocommissioning activities reasonably expected to produce multiyear savings. The commission shall authorize an electrical corporation and gas corporation to count all energy savings achieved through the authorized programs created by this subdivision, unless determined otherwise, toward overall energy efficiency goals or targets established by the commission. The commission may adjust the energy efficiency goals or targets of an electrical corporation and gas corporation to reflect this change in savings estimation consistent with this subdivision and subdivision (d).
(c)Effective January 1, 2016, electrical corporations and gas corporations are authorized to implement the provisions of subdivision (b) for high opportunity projects or programs. The commission shall provide expedited authorization of high opportunity projects and programs to apply the savings baseline provisions in subdivision (b).
(d)In furtherance of subdivision (b), the commission, in consultation with the Energy Commission, shall consider all of the following:
(1)The results of any interagency baseline assessment.
(2)Any available results from electrical corporation and gas corporation baseline pilot studies ordered in commission Decision 14-10-046 (October 24, 2014). 2014), Decision Establishing Energy Efficiency Savings Goals and Approving 2015 Energy Efficiency Programs and Budgets.
(3)Information necessary to ensure consistency with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(e)The commission may direct electrical corporations and gas corporations to make filings that are necessary to ensure coordination with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(f)The commission shall prioritize energy efficiency activities consistent with Sections 454.55 and 454.56.
(g)(1)This subdivision shall impose the operative requirements pursuant to this section for custom projects and other custom programs for industrial, agricultural, commercial, residential, and public sector customers. This subdivision shall become operative on July 1, 2019, and shall apply only to those programs and projects.
(A)The commission shall authorize electrical corporations and gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of industrial, agricultural, commercial, residential, and public sector customers based on nationally recognized measurement and verification standards, such as the International Performance Measurement and Verification Protocol.
(B)All energy savings achieved through the programs authorized pursuant to this subdivision shall count toward the overall energy efficiency goals or targets established by the commission for an electrical corporation, gas corporation, or program administrator.
(C)The commission may adjust the energy efficiency goals or targets of an electrical corporation or gas corporation to reflect a change in the forecast energy savings consistent with this subdivision and subdivision (d).
(2)The commission shall develop and maintain rules for custom energy efficiency projects that include eligibility criteria and other metrics for determining whether a project is eligible for funding pursuant to the program.
(A)The commission shall review and circulate for public review and comment statewide eligibility criteria or metrics at least 30 days prior to changes, including posting on the commissions Internet Web site.
(B)After the initial 30-day period for public review and comment, any changes to the initial proposed eligibility criteria or metrics shall be circulated for public review for not less than 15 days prior to final adoption.
(C)Once eligibility criteria or metrics are adopted, any proposed revision shall be circulated for public review and comment for not less than 30 days prior to a revision. For these purposes, grammatical corrections or other nonsubstantive modifications are not a revision and may be made when the need for the correction or modification is discovered.
(D)Statewide eligibility criteria or metrics shall operate only on a prospective basis, shall be applied uniformly and consistently by each electrical corporation and gas corporation, and shall not be applied retroactively to any pending or approved applications.
(E)Any delay in the adoption of eligibility criteria or metrics past July 1, 2019, shall not be the basis for denial of any application nor a basis to suspend the program.
(3)(A)The rules adopted by the commission for custom energy efficiency projects shall require each electrical corporation and gas corporation to maintain a custom measure project archive. The commission shall develop and maintain requirements for what information is to be included in the custom measure project archive, including information required to support the applications of customers custom energy efficiency projects.
(B)(i)Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the commission shall make a determination of whether the application has been selected for review within 15 days and notify the electrical corporation or gas corporation of its decision to review.
(ii)The electrical corporation or gas corporation shall make the project application supporting documentation available to the commission for review within 15 business days of the commission review selection date. The commission shall develop and maintain requirements for what information is to be included in the custom measure project archive for those customer projects selected for review.
(iii)The commission shall, within 15 days of the submission of a project to the custom measure project archive, promptly notify an electrical corporation or gas corporation of any deficiency in the information supporting an application.
(iv)The review of a proposed project shall be concluded within 30 business days from when the date a projects documentation is received by the commission, unless the commission determines it was provided incomplete or inaccurate supporting information from the electrical corporation or gas corporation, and notifies the electrical corporation and gas corporation of the need for additional review time. The 30 business days will restart from the time complete and accurate documentation, as noted in the notification of deficiencies, is submitted by the electrical corporation or gas corporation. The electrical corporation or gas corporation shall notify the customer applicant within 48 hours of any delays as a result of incomplete or inaccurate supporting project information, or if the commission needs additional review time.
(C)The commission shall notify the electrical corporation or gas corporation of the specific deficiencies in the information supporting an application, including each basis as to why the project is inconsistent with the eligibility criteria and metrics, and which may include failure to adequately define the project, make specific recommendations for the conditions under which the project would be approved. If the commission is unable to identify specific deficiencies, the application shall be deemed complete and sufficiently supported for review. approved, and, if the application fails to adequately define the project, identify aspects of the project that require further definition.
(D)If, as a result of the review, the commission rejects the proposed project or requests modification of the project, the commission shall notify the electrical corporation or gas corporation of the reasons for the rejection or request for modification, including each basis as to why the project is rejected or modification is requested, and make specific recommendations for the conditions under which the project would be approved. The electrical corporation or gas corporation shall promptly inform the applicant as to the reasons why the project was rejected and the specific recommendations for the conditions under which the project would be approved.
(E)The commission shall not reject a proposed project or request modification of a project on the basis of inconsistency with eligibility criteria or metrics that were not in effect at the time the project application was submitted.
(F)If any party to the project is unsatisfied with the commissions directions for the project, a dispute resolution process may be initiated by that party. The commission shall adopt rules for the conduct of the dispute resolution process.
(G)If a project is not selected by the commission for review within the period determined pursuant of to subparagraph (B), or if a project has not received written direction from the commission within the period specified in clause (iv) of subparagraph (B), the commission shall be deemed to have waived review of the project and the project may proceed as if it had been approved by the commission, but the project shall still be subject to the review of the electrical or gas corporation.
(4)(A)For projects that were not reviewed and did not receive written documentation, as specified in subparagraph (G) of paragraph (3), an electrical corporation or gas corporation may rely on its project application review process to determine the forecast energy savings values for the project based on rules adopted by the commission, and base the final customer incentive payment and contractor pay-for-performance payment on postinstallation measurement and verification results.
(B)The commission may employ postinstallation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
(5)Except as described in paragraph (2), nothing in this subdivision limits the commissions existing authority to evaluate projects or programs for the purpose of prospectively adjusting the projects or programs for industrial and agricultural processes, facilities, systems, and equipment.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)The commission shall investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed pursuant to Section 25943 of the Public Resources Code.
(2)It is the intent of the Legislature that the commission implement this section by establishing applicable rules, within a reasonable period of time and in an open process, that are clear and operate on a prospective basis.
(b)Recognizing the already underway 2015 commission work to adopt efficiency potential and goals, the Energy Commission work on its 2015 energy demand forecast, and the need to determine how to incorporate meter-based performance into determinations of goals, portfolio cost-effectiveness, and authorized budgets, the commission, in a separate or existing proceeding, shall, by September 1, 2016, authorize electrical corporations or gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings based on all estimated energy savings and energy usage reductions, taking into consideration the overall reduction in normalized metered energy consumption as a measure of energy savings. Those programs shall include energy usage reductions resulting from the adoption of a measure or installation of equipment required for modifications to existing buildings to bring them into conformity with, or exceed, the requirements of Title 24 of the California Code of Regulations, as well as operational, behavioral, and retrocommissioning activities reasonably expected to produce multiyear savings. The commission shall authorize an electrical corporation and gas corporation to count all energy savings achieved through the authorized programs created by this subdivision, unless determined otherwise, toward overall energy efficiency goals or targets established by the commission. The commission may adjust the energy efficiency goals or targets of an electrical corporation and gas corporation to reflect this change in savings estimation consistent with this subdivision and subdivision (d).
(c)Effective January 1, 2016, electrical corporations and gas corporations are authorized to implement the provisions of subdivision (b) for high opportunity projects or programs. The commission shall provide expedited authorization of high opportunity projects and programs to apply the savings baseline provisions in subdivision (b).
(d)In furtherance of subdivision (b), the commission, in consultation with the Energy Commission, shall consider all of the following:
(1)The results of any interagency baseline assessment.
(2)Any available results from electrical corporation and gas corporation baseline pilot studies ordered in commission Decision 14-10-046 (October 24, 2014).
(3)Information necessary to ensure consistency with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(e)The commission may direct electrical corporations and gas corporations to make filings that are necessary to ensure coordination with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(f)The commission shall prioritize energy efficiency activities consistent with Sections 454.55 and 454.56.
(g)(1)This subdivision shall impose the operative requirements pursuant to this section for custom projects and other custom programs for industrial, agricultural, commercial, residential, and public sector customers. This subdivision shall become operative on July 1, 2019, and shall apply only to those programs and projects.
(A)The commission shall authorize electrical corporations and gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of industrial, agricultural, commercial, residential, and public sector customers based on reductions in normalized metered energy consumption as described in subdivision (b). nationally recognized measurement and verification standards, such as the International Performance Measurement and Verification Protocol.
(B)All energy savings achieved through the programs authorized pursuant to this subdivision shall count toward the overall energy efficiency goals or targets established by the commission for an electrical corporation, gas corporation, or program administrator.
(C)The commission may adjust the energy efficiency goals or targets of an electrical corporation or gas corporation to reflect a change in the forecast energy savings consistent with this subdivision and subdivision (d).
(2)The commission shall adopt develop and maintain rules for custom energy efficiency projects and other energy efficiency programs for industrial, agricultural, commercial, residential, and public sector customers. The rules shall require the commission to develop and maintain eligibility criteria or that include eligibility criteria and other metrics for determining whether a project is eligible for funding pursuant to the program.
(A)Initial proposed eligibility criteria or metrics shall be circulated for public review and comment no fewer than 30 days and not more than 60 The commission shall review and circulate for public review and comment statewide eligibility criteria or metrics at least 30 days prior to changes, including posting on the commissions Internet Web site.
(B)After the initial 30- to 60-day 30-day period for public review and comment, any changes to the initial proposed eligibility criteria or metrics shall be circulated for public review for not less than 30 15 days prior to final adoption.
(C)Once eligibility criteria or metrics are adopted, any proposed revision shall be circulated for public review and comment for not less than 30 days prior to a revision. For these purposes, grammatical corrections or other nonsubstantive modifications are not a revision and may be made when the need for the correction or modification is discovered.
(D)Eligibility Statewide eligibility criteria or metrics shall operate only on a prospective basis, shall be applied uniformly and consistently by each electrical and gas corporation, and shall not be applied retroactively to any pending or approved applications.
(E)Any delay in the adoption of eligibility criteria or metrics past July 1, 2019, shall not be the basis for denial of any application nor a basis to suspend the program.
(3)(A)The rules adopted by the commission for custom energy efficiency projects and other energy efficiency programs for industrial, agricultural, commercial, residential, and public sector customers shall require each electrical corporation and gas corporation to maintain a customer custom measure project archive. The rules shall require the commission to commission shall develop and maintain requirements for what information is to be included in the custom measure project archive, including information relative to preapplication-stage and application-stage customer required to support the applications of customers custom energy efficiency projects.
(B)(i)Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the commission shall make a determination of whether the application has been selected for review within 30 15 days and notify the electrical corporation or gas corporation of its decision to review. The
(ii)The electrical corporation or gas corporation shall make the project application supporting documentation available to the commission for review within 15 business days of the commission review selection date. The commission shall develop and maintain requirements for what information is to be included in the customer custom measure project archive for those customer projects selected for review. The
(iii)The commission shall, within 30 15 days of the submission of a project to the custom measures measure project archive, promptly notify an electrical corporation or gas corporation of any deficiency in the information supporting an application.
(iv)The review of a proposed project shall be concluded within 30 business days from when the date a projects documentation is received by the commission, unless the commission determines it was provided incomplete or inaccurate supporting information from the electrical corporation or gas corporation, and notifies the electrical corporation and gas corporation of the need for additional review time. The 30 business days will restart from the time complete and accurate documentation, as noted in the notification of deficiencies, is submitted by the electrical corporation or gas corporation. The electrical corporation or gas corporation shall notify the customer applicant within 48 hours of any delays as a result of incomplete or inaccurate supporting project information, or if the commission needs additional review time.
(C)The commission shall notify the electrical corporation or gas corporation of the specific deficiencies in the information supporting an application, including each basis as to why the project is inconsistent with the eligibility criteria and metrics, and make specific recommendations for the conditions under which the project would be approved. If the commission is unable to identify specific deficiencies, the application shall be deemed complete and sufficiently supported for review.
(D)The preinstallation review of a proposed project shall be concluded within 30 days from when the project is selected for review.(E)(D)If, as a result of the review, the commission rejects the proposed project or requests modification of the project, the commission shall notify the electrical corporation or gas corporation and the project applicant of the reasons for the rejection or request for modification, including each basis as to why the project is inconsistent with the eligibility criteria and metrics, rejected or modification is requested, and make specific recommendations for the conditions under which the project would be approved.
(F)(E)The commission shall not reject a proposed project or request modification of a project on the basis of inconsistency with eligibility criteria or metrics that were not in effect at the time the project application was submitted.
(G)(F)If parties to the project are any party to the project is unsatisfied with the commissions directions for the project, a dispute resolution process may be initiated by an electrical corporation, gas corporation, or project applicant. that party. The commission shall adopt rules for the conduct of the dispute resolution process.
(H)(G)If a project is not selected by the commission for review within the period determined pursuant of subparagraph (B), or if a project has not received written direction from the commission within the period specified in subparagraph (D), clause (iv) of subparagraph (B), the project may proceed as if it had been approved by the commission. commission, but the project shall still be subject to the review of the electrical or gas corporation.
(4)(A)For projects that were not reviewed, were approved following review, or that were operationally approved pursuant to subparagraph (H) reviewed and did not receive written documentation, as specified in subparagraph (G) of paragraph (3), an electrical corporation or gas corporation may rely on its project application review process to determine the forecast energy savings values submitted or approved for the project when entering into estimated incentive agreements for the project and in any subsequent energy savings claims before the commission. for the project based on rules adopted by the commission, and base the final customer incentive payment and contractor pay-for-performance payment on postinstallation measurement and verification results.
(B)The commission may employ postinstallation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
(5)Except as described in paragraph (2), nothing in this subdivision limits the commissions existing authority to evaluate projects or programs for the purpose of prospectively adjusting the projects or programs for industrial and agricultural processes, facilities, systems, and equipment.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)The commission shall investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed pursuant to Section 25943 of the Public Resources Code.
(2)It is the intent of the Legislature that the commission implement this section by establishing applicable rules, within a reasonable period of time and in an open process, that are clear and operate on a prospective basis.
(b)Recognizing the already underway 2015 commission work to adopt efficiency potential and goals, the Energy Commission work on its 2015 energy demand forecast, and the need to determine how to incorporate meter-based performance into determinations of goals, portfolio cost-effectiveness, and authorized budgets, the commission, in a separate or existing proceeding, shall, by September 1, 2016, authorize electrical corporations or gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings based on all estimated energy savings and energy usage reductions, taking into consideration the overall reduction in normalized metered energy consumption as a measure of energy savings. Those programs shall include energy usage reductions resulting from the adoption of a measure or installation of equipment required for modifications to existing buildings to bring them into conformity with, or exceed, the requirements of Title 24 of the California Code of Regulations, as well as operational, behavioral, and retrocommissioning activities reasonably expected to produce multiyear savings. Electrical corporations and gas corporations shall be permitted to recover in rates the reasonable costs of these programs. The commission shall authorize an electrical corporation and gas corporation to count all energy savings achieved through the authorized programs created by this subdivision, unless determined otherwise, toward overall energy efficiency goals or targets established by the commission. The commission may adjust the energy efficiency goals or targets of an electrical corporation and gas corporation to reflect this change in savings estimation consistent with this subdivision and subdivision (d).
(c)Effective January 1, 2016, electrical corporations and gas corporations are authorized to implement the provisions of subdivision (b) for high opportunity projects or programs. The commission shall provide expedited authorization of high opportunity projects and programs to apply the savings baseline provisions in subdivision (b).
(d)In furtherance of subdivision (b), the commission, in consultation with the Energy Commission, shall consider all of the following:
(1)The results of any interagency baseline assessment.
(2)Any available results from electrical corporation and gas corporation baseline pilot studies ordered in commission Decision 14-10-046 (October 24, 2014).
(3)Information necessary to ensure consistency with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(e)The commission may direct electrical corporations and gas corporations to make filings that are necessary to ensure coordination with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(f)The commission shall prioritize energy efficiency activities consistent with Sections 454.55 and 454.56.
(g)(1)This subdivision shall impose the operative requirements pursuant to this section for custom projects and other custom programs for industrial, agricultural, commercial, residential, and public sector customers. This subdivision shall become operative on July 1, 2019, and shall apply only to those programs and projects.
(A)The commission shall authorize electrical corporations and gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of industrial, agricultural, commercial, residential, and public sector customers based on reductions in normalized metered energy consumption as described in subdivision (b).
(B)Electrical corporations and gas corporations shall be permitted to recover in rates the reasonable costs of these programs.(C)(B)All energy savings achieved through the programs authorized pursuant to this subdivision shall count toward the overall energy efficiency goals or targets established by the commission for an electrical corporation, gas corporation, or program administrator.
(D)(C)The commission may adjust the energy efficiency goals or targets of an electrical corporation or gas corporation to reflect a change in the forecast energy savings consistent with this subdivision and subdivision (d).
(2)The commission shall adopt rules for custom energy efficiency projects and other energy efficiency programs for industrial, agricultural, commercial, residential, and public sector customers. The rules shall require the commission to develop and maintain eligibility criteria or other metrics for determining whether a project is eligible for funding pursuant to the program.
(A)Initial proposed eligibility criteria or metrics shall be circulated for public review and comment no fewer than 30 days and not more than 60 days prior to changes, including posting on the commissions Internet Web site.
(B)After the initial 30- to 60-day period for public review and comment, any changes to the initial proposed eligibility criteria or metrics shall be circulated for public review for not less than 30 days prior to final adoption.
(C)Once eligibility criteria or metrics are adopted, any proposed revision shall be circulated for public review and comment for not less than 30 days prior to a revision. For these purposes, grammatical corrections or other nonsubstantive modifications are not a revision and may be made when the need for the correction or modification is discovered.
(D)Eligibility criteria or metrics shall operate only on a prospective basis, and shall not be applied retroactively to any pending or approved applications.
(E)Any delay in the adoption of eligibility criteria or metrics past July 1, 2019, shall not be the basis for denial of any application nor a basis to suspend the program.
(3)(A)The rules adopted by the commission for custom energy efficiency projects and other energy efficiency programs for industrial, agricultural, commercial, residential, and public sector customers shall require each electrical corporation and gas corporation to maintain a customer measure project archive. The rules shall require the commission to develop and maintain requirements for what information is to be included in the custom measure project archive, including information relative to preapplication-stage and application-stage customer energy efficiency projects.
(B)Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the commission shall make a determination of whether the application has been selected for review within 30 days and notify the electrical corporation or gas corporation of its decision to review. The commission shall develop and maintain requirements for what information is to be included in the customer measure project archive for those customer projects selected for review. The commission shall, within 30 days of the submission of a project to the custom measures project archive, promptly notify an electrical corporation or gas corporation of any deficiency in the information supporting an application.
(C)The commission shall notify the electrical corporation or gas corporation of the specific deficiencies in the information supporting an application, including each basis as to why the project is inconsistent with the eligibility criteria and metrics, and make specific recommendations for the conditions under which the project would be approved. If the commission is unable to identify specific deficiencies, the application shall be deemed complete and sufficiently supported for review.
(D)The preinstallation review of a proposed project shall be concluded within 30 days from when the project is selected for review.
(E)If, as a result of the review, the commission rejects the proposed project or requests modification of the project, the commission shall notify the electrical corporation or gas corporation and the project applicant of the reasons for the rejection or request for modification, including each basis as to why the project is inconsistent with the eligibility criteria and metrics, and make specific recommendations for the conditions under which the project would be approved.
(F)The commission shall not reject a proposed project or request modification of a project on the basis of inconsistency with eligibility criteria or metrics that were not in effect at the time the project application was submitted.
(G)If parties to the project are unsatisfied with the commissions directions for the project, a dispute resolution process may be initiated by an electrical corporation, gas corporation, or project applicant. The commission shall adopt rules for the conduct of the dispute resolution process.
(H)If a project is not selected for review within the period determined pursuant of subparagraph (B), or if a project has not received written direction from the commission within the period specified in subparagraph (D), the project may proceed as if it had been approved by the commission.
(4)(A)For projects that were not reviewed, were approved following review, or that were operationally approved pursuant to subparagraph (H) of paragraph (3), an electrical corporation or gas corporation may rely on the forecast energy savings values submitted or approved for the project when entering into estimated incentive agreements for the project and in any subsequent energy savings claims before the commission.
(B)The commission may employ postinstallation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
(5)Except as described in paragraph (2), nothing in this subdivision limits the commissions existing authority to evaluate projects or programs for the purpose of prospectively adjusting the projects or programs for industrial and agricultural processes, facilities, systems, and equipment.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)The commission shall investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed pursuant to Section 25943 of the Public Resources Code.
(2)It is the intent of the Legislature that the commission implement this section by establishing applicable rules, within a reasonable period of time and in an open process, that are clear and operate on a prospective basis.
(b)Recognizing the already underway 2015 commission work to adopt efficiency potential and goals, the Energy Commission work on its 2015 energy demand forecast, and the need to determine how to incorporate meter-based performance into determinations of goals, portfolio cost-effectiveness, and authorized budgets, the commission, in a separate or existing proceeding, shall, by September 1, 2016, authorize electrical corporations or gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings based on all estimated energy savings and energy usage reductions, taking into consideration the overall reduction in normalized metered energy consumption as a measure of energy savings. Those programs shall include energy usage reductions resulting from the adoption of a measure or installation of equipment required for modifications to existing buildings to bring them into conformity with, or exceed, the requirements of Title 24 of the California Code of Regulations, as well as operational, behavioral, and retrocommissioning activities reasonably expected to produce multiyear savings. Electrical corporations and gas corporations shall be permitted to recover in rates the reasonable costs of these programs. The commission shall authorize an electrical corporation and gas corporation to count all energy savings achieved through the authorized programs created by this subdivision, unless determined otherwise, toward overall energy efficiency goals or targets established by the commission. The commission may adjust the energy efficiency goals or targets of an electrical corporation and gas corporation to reflect this change in savings estimation consistent with this subdivision and subdivision (d).
(c)Effective January 1, 2016, electrical corporations and gas corporations are authorized to implement the provisions of subdivision (b) for high opportunity projects or programs. The commission shall provide expedited authorization of high opportunity projects and programs to apply the savings baseline provisions in subdivision (b).
(d)In furtherance of subdivision (b), the commission, in consultation with the Energy Commission, shall consider all of the following:
(1)The results of any interagency baseline assessment.
(2)Any available results from electrical corporation and gas corporation baseline pilot studies ordered in commission Decision 14-10-046 (October 24, 2014).
(3)Information necessary to ensure consistency with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(e)The commission may direct electrical corporations and gas corporations to make filings that are necessary to ensure coordination with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(f)The commission shall prioritize energy efficiency activities consistent with Sections 454.55 and 454.56.
(g)(1)This subdivision shall impose the operative requirements pursuant to this section for custom projects and other custom programs for industrial and agricultural processes, facilities, systems, and equipment. industrial, agricultural, commercial, residential, and public sector customers. This subdivision shall become operative on July 1, 2019, and shall apply only to those programs and projects.
(A)The commission shall authorize electrical corporations and gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of industrial and agricultural processes, facilities, systems, and equipment industrial, agricultural, commercial, residential, and public sector customers based on reductions in normalized metered energy consumption as described in subdivision (b).
(B)Electrical corporations and gas corporations shall be permitted to recover in rates the reasonable costs of these programs.
(C)All energy savings achieved through the programs authorized pursuant to this subdivision shall count toward the overall energy efficiency goals or targets established by the commission for an electrical corporation, gas corporation, or program administrator.
(D)The commission may adjust the energy efficiency goals or targets of an electrical corporation or gas corporation to reflect a change in the forecast energy savings consistent with this subdivision and subdivision (d).
(2)The commission shall adopt rules for custom energy efficiency projects and other energy efficiency programs for industrial and agricultural processes, facilities, systems, and equipment. industrial, agricultural, commercial, residential, and public sector customers. The rules shall require the energy division of the commission to develop and maintain eligibility criteria or other metrics for determining whether a project is eligible for funding pursuant to the program.
(A)Initial proposed eligibility criteria or metrics shall be circulated for public review and comment no fewer than 30 days and not more than 60 days prior to changes, including posting on the commissions Internet Web site.
(B)After the initial 30- to 60-day period for public review and comment, any changes to the initial proposed eligibility criteria or metrics shall be circulated for public review for not less than 30 days prior to final adoption.
(C)Once eligibility criteria or metrics are adopted, any proposed revision shall be circulated for public review and comment for not less than 30 days prior to a revision. For these purposes, grammatical corrections or other nonsubstantive modifications are not a revision and may be made when the need for the correction or modification is discovered.
(D)Eligibility criteria or metrics shall operate only on a prospective basis, and shall not be applied retroactively to any pending or approved applications.
(E)Any delay in the adoption of eligibility criteria or metrics past July 1, 2019, shall not be the basis for denial of any application nor a basis to suspend the program.
(3)(A)The rules adopted by the commission for custom energy efficiency projects and other energy efficiency programs for industrial and agricultural processes, facilities, systems, and equipment industrial, agricultural, commercial, residential, and public sector customers shall require each electrical corporation and gas corporation to maintain a customer measure project archive. The rules shall require the energy division of the commission to develop and maintain requirements for what information is to be included in the custom measure product project archive, including information relative to preapplication-stage and application-stage customer energy efficiency projects.
(B)Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the energy division of the commission shall make a determination of whether the application has been selected for review within 30 days and notify the electrical corporation or gas corporation of its decision to review. The energy division commission shall develop and maintain requirements for what information is to be included in the customer measure product project archive for those customer projects selected for review. The energy division shall commission shall, within 30 days of the submission of a project to the custom measures project archive, promptly notify an electrical corporation or gas corporation of any deficiency in the information supporting an application, and the 30 days within which the energy division is required to determine whether the application is to be reviewed shall be tolled until the deficiency in the submission of information to support the application is corrected. application.
(C)The commission shall notify the electrical corporation or gas corporation of the specific deficiencies in the information supporting an application, including each basis as to why the project is inconsistent with the eligibility criteria and metrics, and make specific recommendations for the conditions under which the project would be approved. If the commission is unable to identify specific deficiencies, the application shall be deemed complete and sufficiently supported for review.
(C)(D)The preinstallation review of a proposed project shall be concluded within 60 30 days from when the project is selected for review.
(D)(E)If, as a result of the review, the energy division of the commission rejects the proposed project or requests modification of the project, the energy division commission shall notify the electrical corporation or gas corporation and the project applicant of the reasons for the rejection or request for modification, including each basis as to why the project is inconsistent with the eligibility criteria and metrics, and make specific recommendations for the conditions under which the project would be approved.
(E)(F)The energy division of the commission shall not reject a proposed project or request modification of a project on the basis of inconsistency with eligibility criteria or metrics that were not in effect at the time the project application was submitted.
(F)(G)If parties to the project are unsatisfied with the energy divisions commissions directions for the project, a dispute resolution process may be initiated by an electrical corporation or gas corporation. corporation, gas corporation, or project applicant. The commission shall adopt rules for the conduct of the dispute resolution process.
(G)(H)If a project is not selected for review within the period determined pursuant of subparagraph (B), or if a project has not received written direction from the commission within the period specified in subparagraph (C), (D), the project may proceed as if it had been approved by the commission.
(4)(A)For projects that were not reviewed, were approved following review, or that were operationally approved pursuant to subparagraph (G) (H) of paragraph (3), an electrical corporation or gas corporation may rely on the forecast energy savings values submitted or approved for the project when entering into estimated incentive agreements for the project and in any subsequent energy savings claims before the commission.
(B)The commission may employ postinstallation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
(5)Except as described in paragraph (2), nothing in this subdivision limits the commissions existing authority to evaluate projects or programs for the purpose of prospectively adjusting the projects or programs for industrial and agricultural processes, facilities, systems, and equipment.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)The commission shall investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed pursuant to Section 25943 of the Public Resources Code.
(2)It is the intent of the Legislature that the commission implement this section by establishing applicable rules, within a reasonable period of time and in an open process, that are clear and operate on a prospective basis.
(b)Recognizing the already underway 2015 commission work to adopt efficiency potential and goals, the Energy Commission work on its 2015 energy demand forecast, and the need to determine how to incorporate meter-based performance into determinations of goals, portfolio cost-effectiveness, and authorized budgets, the commission, in a separate or existing proceeding, shall, by September 1, 2016, authorize electrical corporations or gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings based on all estimated energy savings and energy usage reductions, taking into consideration the overall reduction in normalized metered energy consumption as a measure of energy savings. Those programs shall include energy usage reductions resulting from the adoption of a measure or installation of equipment required for modifications to existing buildings to bring them into conformity with, or exceed, the requirements of Title 24 of the California Code of Regulations, as well as operational, behavioral, and retrocommissioning activities reasonably expected to produce multiyear savings. Electrical corporations and gas corporations shall be permitted to recover in rates the reasonable costs of these programs. The commission shall authorize an electrical corporation and gas corporation to count all energy savings achieved through the authorized programs created by this subdivision, unless determined otherwise, toward overall energy efficiency goals or targets established by the commission. The commission may adjust the energy efficiency goals or targets of an electrical corporation and gas corporation to reflect this change in savings estimation consistent with this subdivision and subdivision (d).
(c)Effective January 1, 2016, electrical corporations and gas corporations are authorized to implement the provisions of subdivision (b) for high opportunity projects or programs. The commission shall provide expedited authorization of high opportunity projects and programs to apply the savings baseline provisions in subdivision (b).
(d)In furtherance of subdivision (b), the commission, in consultation with the Energy Commission, shall consider all of the following:
(1)The results of any interagency baseline assessment.
(2)Any available results from electrical corporation and gas corporation baseline pilot studies ordered in commission Decision 14-10-046 (October 24, 2014).
(3)Information necessary to ensure consistency with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(e)The commission may direct electrical corporations and gas corporations to make filings that are necessary to ensure coordination with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(f)The commission shall prioritize energy efficiency activities consistent with Sections 454.55 and 454.56.
(g)(1)This subdivision shall impose the operative requirements pursuant to this section for custom projects and other programs for industrial and agricultural processes, facilities, systems, and equipment. This subdivision shall become operative on July 1, 2019, and shall apply only to those programs and projects.
(A)The commission shall authorize electrical corporations and gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of industrial and agricultural processes, facilities, systems, and equipment based on reductions in normalized metered energy consumption as described in subdivision (b).
(B)Electrical corporations and gas corporations shall be permitted to recover in rates the reasonable costs of these programs.
(C)All energy savings achieved through the programs authorized pursuant to this subdivision shall count toward the overall energy efficiency goals or targets established by the commission for an electrical corporation, gas corporation, or program administrator.
(D)The commission may adjust the energy efficiency goals or targets of an electrical corporation or gas corporation to reflect a change in the forecast energy savings consistent with this subdivision and subdivision (d).
(2)The commission shall adopt rules for custom energy efficiency projects and other energy efficiency programs for industrial and agricultural processes, facilities, systems, and equipment. The rules shall require the energy division of the commission to develop and maintain eligibility criteria or other metrics for determining whether a project is eligible for funding pursuant to the program.
(A)Initial proposed eligibility criteria or metrics shall be circulated for public review and comment at least 30 no fewer than 30 days and not more than 60 days prior to changes, including posting on the commissions Internet Web site.
(B)After the initial 30-day 30- to 60-day period for public review and comment, any changes to the initial proposed eligibility criteria or metrics shall be circulated for public review for not less than 15 30 days prior to final adoption.
(C)Once eligibility criteria or metrics are adopted, any proposed revision shall be circulated for public review and comment for not less than 30 days prior to a revision. For these purposes, grammatical corrections or other nonsubstantive modifications are not a revision and may be made when the need for the correction or modification is discovered.
(D)Eligibility criteria or metrics shall operate only on a prospective basis, and shall not be applied retroactively to pending or approved applications.
(E)Any delay in the adoption of eligibility criteria or metrics past July 1, 2019, shall not be the basis for denial of any application nor a basis to suspend the program.
(3)(A)The rules adopted by the commission for custom energy efficiency projects and other energy efficiency programs for industrial and agricultural processes, facilities, systems, and equipment shall require each electrical corporation and gas corporation to maintain a customer measure project archive. The rules shall require the energy division of the commission to develop and maintain requirements for what information is to be included in the custom measure product archive, including information relative to preapplication-stage and application-stage customer energy efficiency projects.
(B)Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the energy division of the commission shall make a determination of whether the application has been selected for review within 21 30 days and notify the electrical corporation or gas corporation of its decision to review. The energy division shall develop and maintain requirements for what information is to be included in the customer measure product archive for those customer projects selected for review. The energy division shall promptly notify an electrical corporation or gas corporation of any deficiency in the information supporting an application, and the 21 30 days within which the energy division is required to determine whether the application is to be reviewed shall be tolled until the deficiency in the submission of information to support the application is corrected.
(C)The preinstallation review of a proposed project shall be concluded within 30 60 days from when the project is selected for review.
(D)If, as a result of the review, the energy division of the commission rejects the proposed project or requests modification of the project, the energy division shall notify the electrical corporation or gas corporation and the project applicant of the reasons for the rejection or request for modification, including each basis as to why the project is inconsistent with the eligibility criteria and metrics, and make specific recommendations for the conditions under which the project would be approved.
(E)The energy division of the commission shall not reject a proposed project or request modification of a project on the basis of inconsistency with eligibility criteria or metrics that were not in effect at the time the project application was submitted.
(F)If parties to the project are unsatisfied with the energy divisions directions for the project, a dispute resolution process may be initiated by an electrical corporation or gas corporation. The commission shall adopt rules for the conduct of the dispute resolution process.
(G)If a project is not selected for review within the period determined pursuant of subparagraph (B), or if a project has not received written direction from the commission within the period specified in subparagraph (C), the project may proceed as if it had been approved by the commission.
(4)(A)For projects that were not reviewed, were approved following review, or that were operationally approved pursuant to subparagraph (G) of paragraph (3), an electrical corporation or gas corporation may rely on the forecast energy savings values submitted or approved for the project when entering into estimated incentive agreements for the project and in any subsequent energy savings claims before the commission.
(B)The commission may employ postinstallation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
(5)Except as described in paragraph (2), nothing in this subdivision limits the commissions existing authority to evaluate projects or programs for the purpose of prospectively adjusting the projects or programs for industrial and agricultural processes, facilities, systems, and equipment.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)The commission shall investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed pursuant to Section 25943 of the Public Resources Code.
(2)It is the intent of the Legislature that the commission implement this section by establishing applicable rules, within a reasonable period of time and in an open process, that are clear and operate on a prospective basis.
(b)Recognizing the already underway 2015 commission work to adopt efficiency potential and goals, the Energy Commission work on its 2015 energy demand forecast, and the need to determine how to incorporate meter-based performance into determinations of goals, portfolio cost-effectiveness, and authorized budgets, the commission, in a separate or existing proceeding, shall, by September 1, 2016, authorize electrical corporations or gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings based on all estimated energy savings and energy usage reductions, taking into consideration the overall reduction in normalized metered energy consumption as a measure of energy savings. Those programs shall include energy usage reductions resulting from the adoption of a measure or installation of equipment required for modifications to existing buildings to bring them into conformity with, or exceed, the requirements of Title 24 of the California Code of Regulations, as well as operational, behavioral, and retrocommissioning activities reasonably expected to produce multiyear savings. Electrical corporations and gas corporations shall be permitted to recover in rates the reasonable costs of these programs. The commission shall authorize an electrical corporation and gas corporation to count all energy savings achieved through the authorized programs created by this subdivision, unless determined otherwise, toward overall energy efficiency goals or targets established by the commission. The commission may adjust the energy efficiency goals or targets of an electrical corporation and gas corporation to reflect this change in savings estimation consistent with this subdivision and subdivision (d).
(c)Effective January 1, 2016, electrical corporations and gas corporations are authorized to implement the provisions of subdivision (b) for high opportunity projects or programs. The commission shall provide expedited authorization of high opportunity projects and programs to apply the savings baseline provisions in subdivision (b).
(d)In furtherance of subdivision (b), the commission, in consultation with the Energy Commission, shall consider all of the following:
(1)The results of any interagency baseline assessment.
(2)Any available results from electrical corporation and gas corporation baseline pilot studies ordered in commission Decision 14-10-046 (October 24, 2014).
(3)Information necessary to ensure consistency with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(e)The commission may direct electrical corporations and gas corporations to make filings that are necessary to ensure coordination with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(f)The commission shall prioritize energy efficiency activities consistent with Sections 454.55 and 454.56.
(g)(1)This subdivision, rather than subdivision (b), subdivision shall impose the operative requirements pursuant to this section for custom projects and other programs for industrial and agricultural processes, facilities, systems, and equipment. This subdivision shall become operative on July 1, 2019, and shall apply only to those programs and projects.
(A)The commission shall authorize electrical corporations and gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of industrial and agricultural processes, facilities, systems, and equipment based on reductions in normalized metered energy consumption. consumption as described in subdivision (b).
(B)Those programs shall include energy usage reductions resulting from the adoption of a measure or installation of equipment to meet industry standard practice, as well as operational, behavioral, and retrocommissioning activities reasonably expected to produce multiyear savings.(C)(B)Electrical corporations and gas corporations shall be permitted to recover in rates the reasonable costs of these programs.
(D)(C)All energy savings achieved through the programs authorized pursuant to this subdivision shall count toward the overall energy efficiency goals or targets established by the commission for an electrical corporation, gas corporation, or program administrator.
(E)(D)The commission may adjust the energy efficiency goals or targets of an electrical corporation or gas corporation to reflect a change in the forecast energy savings consistent with this subdivision and subdivision (d).
(2)The commission shall adopt rules for custom energy efficiency projects and other energy efficiency programs for industrial and agricultural processes, facilities, systems, and equipment. The rules shall require the energy division of the commission to develop and maintain eligibility criteria or other metrics for determining whether a project is eligible for funding pursuant to the program.
(A)Initial proposed eligibility criteria or metrics shall be circulated for public review and comment at least 30 days prior to changes, including posting on the commissions Internet Web site.
(B)After the initial 30-day period for public review and comment, any changes to the initial proposed eligibility criteria or metrics shall be circulated for public review for not less than 15 days prior to final adoption.
(C)Once eligibility criteria or metrics are adopted, any proposed revision shall be circulated for public review and comment for not less than 30 days prior to a revision. For these purposes, grammatical corrections or other nonsubstantive modifications are not a revision and may be made when the need for the correction or modification is discovered.
(D)Eligibility criteria or metrics shall operate only on a prospective basis, and shall not be applied retroactively to pending or approved applications.
(E)Any delay in the adoption of eligibility criteria or metrics past July 1, 2019, shall not be the basis for denial of any application nor a basis to suspend the program.
(3)(A)The rules adopted by the commission for custom energy efficiency projects and other energy efficiency programs for industrial and agricultural processes, facilities, systems, and equipment shall require each electrical corporation and gas corporation to maintain a customer measure project archive. The rules shall require the energy division of the commission to develop and maintain requirements for what information is to be included in the custom measure product archive, including information relative to preapplication-stage and application-stage customer energy efficiency projects.
(B)Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the energy division of the commission shall make a determination of whether the application has been selected for review within 21 days and notify the electrical corporation or gas corporation of its decision to review. The energy division shall develop and maintain requirements for what information is to be included in the customer measure product archive for those customer projects selected for review. The energy division shall promptly notify an electrical corporation or gas corporation of any deficiency in the information supporting an application, and the 21 days within which the energy division is required to determine whether the application is to be reviewed shall be tolled until the deficiency in the submission of information to support the application is corrected.
(C)The preinstallation review of a proposed project shall be concluded within 30 days from when the project is selected for review.
(D)If, as a result of the review, the energy division of the commission rejects the proposed project or requests modification of the project, the energy division shall notify the electrical corporation or gas corporation and the project applicant of the reasons for the rejection or request for modification, including each basis as to why the project is inconsistent with the eligibility criteria and metrics, and make specific recommendations for the conditions under which the project would be approved.
(E)The energy division of the commission shall not reject a proposed project or request modification of a project on the basis of inconsistency with eligibility criteria or metrics that were not in effect at the time the project application was submitted.
(F)If parties to the project are unsatisfied with the energy divisions directions for the project, a dispute resolution process may be initiated by an electrical corporation or gas corporation. The commission shall adopt rules for the conduct of the dispute resolution process.
(G)If a project is not selected for review within the period determined pursuant of subparagraph (B), or if a project has not received written direction from the commission within the period specified in subparagraph (C), the project may proceed as if it had been approved by the commission.
(4)(A)For projects that were not reviewed, were approved following review, or that were operationally approved pursuant to subparagraph (G) of paragraph (3), an electrical corporation or gas corporation may rely on the forecast energy savings values submitted or approved for the project when entering into estimated incentive agreements for the project and in any subsequent energy savings claims before the commission.
(B)The commission may employ postinstallation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
(5)Except as described in paragraph (2), nothing in this subdivision limits the commissions existing authority to evaluate projects or programs for the purpose of prospectively adjusting the projects or programs for industrial and agricultural processes, facilities, systems, and equipment.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)The commission shall investigate the ability of electrical corporations and gas corporations to provide various energy efficiency financing options to their customers for the purposes of implementing the program developed pursuant to Section 25943 of the Public Resources Code.
(2)It is the intent of the Legislature that the commission implement this section by establishing applicable rules, within a reasonable period of time and in an open process, that are clear and operate on a prospective basis.
(b)Recognizing the already underway 2015 commission work to adopt efficiency potential and goals, the Energy Commission work on its 2015 energy demand forecast, and the need to determine how to incorporate meter-based performance into determinations of goals, portfolio cost-effectiveness, and authorized budgets, the commission, in a separate or existing proceeding, shall, by September 1, 2016, authorize electrical corporations or gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of existing buildings based on all estimated energy savings and energy usage reductions, taking into consideration the overall reduction in normalized metered energy consumption as a measure of energy savings. Those programs shall include energy usage reductions resulting from the adoption of a measure or installation of equipment required for modifications to existing buildings to bring them into conformity with, or exceed, the requirements of Title 24 of the California Code of Regulations, as well as operational, behavioral, and retrocommissioning activities reasonably expected to produce multiyear savings. Electrical corporations and gas corporations shall be permitted to recover in rates the reasonable costs of these programs. The commission shall authorize an electrical corporation and gas corporation to count all energy savings achieved through the authorized programs created by this subdivision, unless determined otherwise, toward overall energy efficiency goals or targets established by the commission. The commission may adjust the energy efficiency goals or targets of an electrical corporation and gas corporation to reflect this change in savings estimation consistent with this subdivision and subdivision (d).
(c)Effective January 1, 2016, electrical corporations and gas corporations are authorized to implement the provisions of subdivision (b) for high opportunity projects or programs. The commission shall provide expedited authorization of high opportunity projects and programs to apply the savings baseline provisions in subdivision (b).
(d)In furtherance of subdivision (b), the commission, in consultation with the Energy Commission, shall consider all of the following:
(1)The results of any interagency baseline assessment.
(2)Any available results from investor-owned utility electrical corporation and gas corporation baseline pilot studies ordered in D.14-10-046. commission Decision 14-10-046 (October 24, 2014).
(3)Information necessary to ensure consistency with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(e)The commission may direct electrical corporations and gas corporations to make filings that are necessary to ensure coordination with the energy forecast and planning functions of the Energy Commission and the Independent System Operator.
(f)The commission shall prioritize energy efficiency activities consistent with Sections 454.55 and 454.56.
(g)(1)This subdivision, rather than subdivision (b), shall impose the operative requirements pursuant to this section for custom projects and other programs for industrial and agricultural processes, facilities, systems, and equipment. This subdivision shall become operative on July 1, 2019, and shall apply only to those programs and projects.
(A)The commission shall authorize electrical corporations and gas corporations to provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of industrial and agricultural processes, facilities, systems, and equipment based on reductions in normalized metered energy consumption.
(B)Those programs shall include energy usage reductions resulting from the adoption of a measure or installation of equipment to meet industry standard practice, as well as operational, behavioral, and retrocommissioning activities reasonably expected to produce multiyear savings.
(C)Electrical corporations and gas corporations shall be permitted to recover in rates the reasonable costs of these programs.
(D)All energy savings achieved through the programs authorized pursuant to this subdivision shall count toward the overall energy efficiency goals or targets established by the commission for an electrical corporation, gas corporation, or program administrator.
(E)The commission may adjust the energy efficiency goals or targets of an electrical corporation or gas corporation to reflect a change in the forecast energy savings consistent with this subdivision and subdivision (d).
(2)The commission shall adopt rules for custom energy efficiency projects and other energy efficiency programs for industrial and agricultural processes, facilities, systems, and equipment. The rules shall require the energy division of the commission to develop and maintain eligibility criteria or other metrics for determining whether a project is eligible for funding pursuant to the program.
(A)Initial proposed eligibility criteria or metrics shall be circulated for public review and comment at least 30 days prior to changes, including posting on the commissions Internet Web site.
(B)After the initial 30-day period for public review and comment, any changes to the initial proposed eligibility criteria or metrics shall be circulated for public review for not less than 15 days prior to final adoption.
(C)Once eligibility criteria or metrics are adopted, any proposed revision shall be circulated for public review and comment for not less than 30 days prior to a revision. For these purposes, grammatical corrections or other nonsubstantive modifications are not a revision and may be made when the need for the correction or modification is discovered.
(D)Eligibility criteria or metrics shall operate only on a prospective basis, and shall not be applied retroactively to pending or approved applications.
(E)Any delay in the adoption of eligibility criteria or metrics past July 1, 2019, shall not be the basis for denial of any application nor a basis to suspend the program.
(3)(A)The rules adopted by the commission for custom energy efficiency projects and other energy efficiency programs for industrial and agricultural processes, facilities, systems, and equipment shall require each electrical corporation and gas corporation to maintain a customer measure project archive. The rules shall require the energy division of the commission to develop and maintain requirements for what information is to be included in the custom measure product archive, including information relative to preapplication-stage and application-stage customer energy efficiency projects.
(B)Upon being notified of the filing of a new application, or that a proposed project has moved from the preapplication stage to the application stage, the energy division of the commission shall make a determination of whether the application has been selected for review within 21 days and notify the electrical corporation or gas corporation of its decision to review. The energy division shall develop and maintain requirements for what information is to be included in the customer measure product archive for those customer projects selected for review. The energy division shall promptly notify an electrical corporation or gas corporation of any deficiency in the information supporting an application, and the 21 days within which the energy division is required to determine whether the application is to be reviewed shall be tolled until the deficiency in the submission of information to support the application is corrected.
(C)The preinstallation review of a proposed project shall be concluded within 30 days from when the project is selected for review.
(D)If, as a result of the review, the energy division of the commission rejects the proposed project or requests modification of the project, the energy division shall notify the electrical corporation or gas corporation and the project applicant of the reasons for the rejection or request for modification, each basis as to why the project is inconsistent with the eligibility criteria and metrics, and make specific recommendations for the conditions under which the project would be approved.
(E)The energy division of the commission shall not reject a proposed project or request modification of a project on the basis of inconsistency with eligibility criteria or metrics that were not in effect at the time the project application was submitted.
(F)If parties to the project are unsatisfied with the energy divisions directions for the project, a dispute resolution process may be initiated by an electrical corporation or gas corporation. The commission shall adopt rules for the conduct of the dispute resolution process.
(G)If a project is not selected for review within the period determined pursuant of subparagraph (B), or if a project has not received written direction from the commission within the period specified in subparagraph (C), the project may proceed as if it had been approved by the commission.
(4)(A)For projects that were not reviewed, were approved following review, or that were operationally approved pursuant to subparagraph (G) of paragraph (3), an electrical corporation or gas corporation may rely on the forecast energy savings values submitted or approved for the project when entering into estimated incentive agreements for the project and in any subsequent energy savings claims before the commission.
(B)The commission may employ postinstallation review of a project to determine if the project was carried out consistent with the application and to obtain information pertaining to whether the eligibility criteria or metrics should be revised.
(5)Except as described in paragraph (2), nothing in this subdivision limits the commissions existing authority to evaluate projects or programs for the purpose of prospectively adjusting the projects or programs for industrial and agricultural processes, facilities, systems, and equipment.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Sep 19, 2018 | Chaptered by Secretary of State. Chapter 562, Statutes of 2018. |
| Sep 19, 2018 | Approved by the Governor. |
| Sep 10, 2018 | Enrolled and presented to the Governor at 4 p.m. |
| Aug 30, 2018 | Assembly amendments concurred in. (Ayes 39. Noes 0.) Ordered to engrossing and enrolling. |
| Aug 30, 2018 | Ordered to special consent calendar. |
| Aug 29, 2018 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 29, 2018 | Read third time. Passed. Ordered to the Senate. |
| Aug 24, 2018 | Read third time and amended. |
| Aug 21, 2018 | Read second time. Ordered to third reading. |
| Aug 20, 2018 | Read second time and amended. Ordered to second reading. |
| Aug 16, 2018 | From committee: Do pass as amended. (Ayes 12. Noes 0.) (August 16). |
| Aug 8, 2018 | August 8 set for first hearing. Placed on suspense file. |
| Jul 3, 2018 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 2, 2018 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 13. Noes 0.) (June 27). |
| Jun 20, 2018 | June 20 hearing postponed by committee. |
| Jun 13, 2018 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on U. & E. |
| Jun 7, 2018 | Referred to Com. on U. & E. |
| May 31, 2018 | In Assembly. Read first time. Held at Desk. |
| May 30, 2018 | Read third time. Passed. (Ayes 31. Noes 0.) Ordered to the Assembly. |
| May 29, 2018 | Read second time. Ordered to third reading. |
| May 25, 2018 | From committee: Do pass as amended. (Ayes 7. Noes 0.) (May 25). |
| May 23, 2018 | Set for hearing May 25. |
| May 22, 2018 | May 22 hearing: Placed on APPR. suspense file. |
| May 14, 2018 | Set for hearing May 22. |
| May 10, 2018 | May 14 hearing postponed by committee. |
| May 4, 2018 | Set for hearing May 14. |
| May 1, 2018 | Read second time and amended. Re-referred to Com. on APPR. |
| Apr 30, 2018 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 10. Noes 0.) (April 25). |
| Apr 12, 2018 | Set for hearing April 25. |
| Apr 11, 2018 | April 17 hearing postponed by committee. |
| Mar 23, 2018 | Set for hearing April 17. |
| Feb 22, 2018 | Referred to Com. on E., U. & C. |
| Feb 14, 2018 | From printer. May be acted upon on or after March 16. |
| Feb 13, 2018 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 30, 2018 | Unfinished Business SB1131 Hertzberg et al. Concurrence | Senate Floor |
Passed |
|
| Aug 29, 2018 | SB 1131 Hertzberg Senate Third Reading By HOLDEN | Assembly Floor |
Passed |
|
| Aug 16, 2018 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jun 27, 2018 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Energy |
Passed |
|
| May 30, 2018 | Senate 3rd Reading SB1131 Hertzberg et al. | Senate Floor |
Passed |
|
| May 25, 2018 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| May 22, 2018 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 25, 2018 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB |
UNFINISHED BUSINESS
Bill No: SB 1131
:
SENATE ENERGY, U. & C. COMMITTEE: 10-0, 4/25/18
AYES: Hueso, Bradford, Cannella, Hertzberg, Hill, McGuire, Skinner, Stern, Vidak, Wiener
NO VOTE RECORDED: Morrell
SENATE APPROPRIATIONS COMMITTEE: 7-0, 5/25/18
AYES: Lara, Bates, Beall, Bradford, Hill, Nielsen, Wiener
SENATE FLOOR: 36-0, 5/30/18
AYES: Allen, Anderson, Atkins, Bates, Beall, Berryhill, Bradford, Dodd, Fuller, Gaines, Galgiani, Glazer, Hernandez, Hertzberg, Hill, Hueso, Lara, Leyva, McGuire, Mitchell, Monning, Moorlach, Morrell, Newman, Nguyen, Nielsen, Pan, Portantino, Roth, Skinner, Stern, Stone, Vidak, Wieckowski, Wiener, Wilk
NO VOTE RECORDED: Cannella, De León, Jackson
ASSEMBLY FLOOR: 79-0, 8/29/18 - See last page for vote
SOURCE: California Efficiency and Demand Management Council
DIGEST:
This bill requires the California Public Utilities Commission (CPUC) to authorize investor-owned utilities (IOUs) incentives for customized industrial, agricultural, commercial, residential, and public sector energy efficiency projects based on nationally recognized measurement and verification standards and establishes new requirements and timelines for the CPUC’s review of these projects.
Assembly Amendments
delete language requiring the CPUC to use normalized metered energy consumption (NMEC) to calculate energy savings; expand the types of projects covered by the bill to include commercial, residential, and public sector projects; remove an explicit authorization in existing law for IOUs to recover energy efficiency incentive costs through rates; and establish more specific timelines for review of energy efficiency projects seeking incentives.
Existing law:
- Requires the California Energy Commission (CEC) to establish a comprehensive program to achieve greater energy savings in California’s existing building stock. (Public Resources Code §25943)
- Creates a charge on electricity and natural gas consumption to fund cost-effective energy efficiency and conservation activities. (Public Utilities Code §381 and §890)
- Requires the CPUC to identify all potentially achievable, cost-effective electricity and natural gas efficiency savings and establish energy efficiency targets and ratepayer-funded programs for IOUs. Requires a gas corporation to first meet its unmet resource needs through all available natural gas efficiency and demand reduction resources that are cost effective, reliable, and feasible. (Public Utilities Code §454.55 and §454.56.)
- Requires the CPUC to authorize an IOU to provide incentives for the cost of energy efficiency programs based on all estimated energy savings, including energy savings from bringing existing buildings into compliance with mandatory energy efficiency codes for existing buildings issued by the CEC, and authorizes an IOU to recover the costs in rates. Directs the CPUC to allow an IOU to take into consideration the overall reduction in NMEC as a measure of energy savings of the IOU’s energy efficiency program. States that the CPUC may adjust the energy efficiency procurement targets to reflect energy efficiency savings achieved in meeting or exceeding mandatory energy efficiency codes for existing buildings. (Public Utilities Code §381.2)
This bill:
- Requires the CPUC to authorize IOU incentives for custom industrial, agricultural, commercial, residential, and public sector energy efficiency projects based on nationally recognized measurement and verification standards such as the International Performance Measurement and Verification Protocol.
- Deletes an existing authorization for IOUs to recover energy efficiency incentive costs from ratepayers.
- Specifies that energy savings achieved from the incentive programs will count towards CPUC energy efficiency goals for these utilities.
- Requires the CPUC to adopt rules for these custom energy efficiency projects, which ensure that the CPUC’s energy division develops and maintains eligibility criteria or other metrics for determining a project’s funding eligibility.
- Establishes a specific public process for the CPUC’s adoption of funding eligibility criteria, including timelines for public review and responses to comments. Adopted eligibility criteria will apply only on a prospective basis and cannot be applied to pending or approved project applications.
- Requires the rules adopted by the CPUC to include requirements for electrical and gas corporations to maintain customer project archives, and they must specify the material included in these archives. These archives must include information about project applications.
- Establishes a process the CPUC must follow for reviewing projects’ eligibility, including specified timelines for reviewing applications, specific information that must be included in notifications about eligibility determinations, and a dispute resolution process.
- Allows projects to proceed as if they had been approved in circumstances where the CPUC has not selected the project for review within the required timeline. These projects will still be subject to electrical or gas corporation review.
Background
Doubling energy efficiency. Existing law requires the CEC to create energy efficiency targets that enable the state to double energy efficiency savings from electricity and natural gas end uses by 2030, to the extent that doing so is cost-effective, feasible, and does not negatively impact public health and safety. The CEC’s Doubling Energy Efficiency Savings by 2030 final report identifies sectors’ electricity and natural gas consumption and potential energy savings. The agricultural sector contributes a little less than seven percent of the state’s electricity use and approximately one percent of the statewide natural gas consumption. The industrial sector uses approximately 15 percent of the state’s electricity and 28 percent of its natural gas. The CEC’s report states, “This sector has significant untapped potential for energy savings. A central challenge in tapping those savings is that each industry has unique situations and proprietary information.”
Under existing law, IOUs are authorized to provide industrial and agricultural customers with incentives to make improvements that result in energy savings. The CPUC provides guidance as efficiency projects are developed. The IOU reviews the project to ensure the project meets certain criteria and submits the project to the CPUC for review. To ensure that the utilities are appropriately reviewing projects, the CPUC selects a small number of projects for additional review. Projects that would require a large amount of incentives or provide large amounts of savings are prioritized. After the CPUC completes its review of these selected projects, these projects are either approved or denied. Approved projects receive incentive funds based on the estimated energy savings. Currently, no consistent deadlines exist for obtaining responses on reviews of proposed projects. Industry stakeholders have claimed that the review process is often delayed and methodologies for calculating savings are unclear.
Measuring energy savings. Estimating savings from energy efficiency measures in industrial and agricultural buildings can be challenging because these buildings and efficiency measures are frequently highly customized in nature. This customization limits the ability to establish and apply a benchmark against which energy savings achieved efficiency measures can be measured. Prior legislation (AB 802, Williams, Chapter 590, Statutes of 2015) established a mechanism for evaluating the energy savings achieved by energy efficiency projects, including projects for commercial buildings. This evaluation uses NMEC and establishes a baseline that can be used to measure energy savings against the baseline. Currently, this methodology is not applied to agricultural and industrial buildings due to their customized nature. However, other methods exist for evaluating energy savings in agricultural and industrial buildings, including strategic energy management models. These models evaluate existing energy management business practices and identify opportunities to optimize energy use at industrial and manufacturing companies. The CPUC authorized strategic energy management programs for industrial customers through a 2016 order on energy efficiency programs (D.16-08-019). The decision allows the use of metered consumption data to calculate savings from behavioral, retrocommissioning, and operational efficiency activities. IOUs started implementing industrial strategic energy management programs in the first quarter of 2018.
This bill requires the CPUC to authorize IOU incentives for custom industrial, agricultural, commercial, residential, and public sector energy efficiency projects based on nationally recognized measurement and verification standards, which may include measurement and verification methods similar to those used in strategic energy management programs. This bill does not explicitly enable IOUs to recover costs for providing incentives for custom projects through ratepayer funds. This bill also deletes an existing authorization allowing IOUs to recover costs for other AB 802 energy efficiency projects through ratepayers. The degree to which ratepayer funds may be used for these projects will depend upon CPUC proceedings.
Ongoing process improvements with stakeholders. Both the CPUC and the industry representatives for the industrial and agricultural sectors have acknowledged that the process for reviewing industrial and agricultural efficiency projects needs additional clarity. Specifically, industry representatives have sought more predictable review timelines, criteria for evaluation, and consistent information on how a project can obtain incentive eligibility criteria. Between May and August 2017, the CPUC convened stakeholder meetings with the Track 2 Working Group to explore opportunities to streamline review processes and eligibility determinations. Based on recommendations from the stakeholder meetings, the CPUC and IOUs identified and started implementing a number of steps to improve the guidance and review process for custom efficiency projects. The CPUC is continuing to hold meetings with stakeholders to ensure transparency and reduce ambiguity. However, some members of the industrial and agricultural sector have sought additional methods for ensuring that their projects are eligible for incentive funding.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
According to the Assembly Appropriations Committee, the CPUC contends the requirements of this bill will entail significant new workload. Specifically, the CPUC estimates implementation of this bill will require just over $915,000 for five new full-time positions and a small amount of consulting costs. The CPUC identifies the following new activities that would result from implementation of this bill:
- Adjust the energy efficiency goals and targets of an IOU resulting from the increase in the energy efficiency of residential, commercial, industrial, agricultural, and public-sector processes, facilities, systems, and equipment based NMEC that the CPUC did not account for when it initially established those goals and targets.
- Develop and maintain eligibility criteria or other metrics for determining whether a project is eligible for funding pursuant to the custom program.
- Develop and maintain requirements for project application information to be included in the IOUs’ custom projects archives.
- Adhere to timelines for custom project review.
- Support economic, policy, and technical analyses and research.
- Conduct workshops and webinars to solicit stakeholder comments.
It is difficult to assess the accuracy of CPUC’s cost estimate. An argument could be made that the CPUC already administers a program that develops rules for and reviews custom projects. This bill, however, makes numerous and specific requirements of how the CPUC administers the program. It is reasonable to assume it will take substantial resources – possibly in the hundreds-of-thousands of dollars annually – for CPUC to accommodate and implement those new requirements.
California Efficiency and Demand Management Council (source)
Advanced Energy Economy
California Business Properties Association
California Farm Bureau Federation
California Food Producers
California Large Energy Consumers Association
California League of Food Producers
California Manufacturers & Technology Association
California State Association of Electrical Workers
California State Pipe Trades Council
Clean Power Campaign
Coalition of California Utility Employees
International Union of Elevator Constructors
Marin Clean Energy
National Association of Energy Service Companies
Natural Resources Defense Council
NFIB
Silicon Valley Leadership Group
Western States Council of Sheet Metal Workers
OPPOSITION: (Verified 8/28/18)
Department of Finance
ARGUMENTS IN SUPPORT: According to the author, “Achieving our state’s pioneering energy goals necessitates that we include all users. This includes the industrial facilities and agricultural equipment where we can capture the most energy savings and lead to reduced greenhouse gas emissions.”
ARGUMENTS IN OPPOSITION: The Department of Finance opposes this bill because it believes that NMEC is not an appropriate method for measuring energy savings from customized efficiency projects. The Department also believes that this bill could provide outsized incentives for upgrades that would have occurred without the offer of an incentive. However, this bill has been amended to remove provisions requiring the CPUC to use NMEC to evaluate savings from customized projects as well as provisions limiting the CPUC’s ability to review energy savings before applying incentives.
ASSEMBLY FLOOR: 79-0, 8/29/18
AYES: Acosta, Aguiar-Curry, Travis Allen, Arambula, Baker, Berman, Bigelow, Bloom, Bonta, Brough, Burke, Caballero, Calderon, Carrillo, Cervantes, Chau, Chávez, Chen, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Dahle, Daly, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gonzalez Fletcher, Gray, Grayson, Harper, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager-Dove, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Mullin, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Quirk, Quirk-Silva, Reyes, Rivas, Rodriguez, Rubio, Salas, Santiago, Steinorth, Mark Stone, Thurmond, Ting, Voepel, Waldron, Weber, Wood, Rendon
NO VOTE RECORDED: Eggman
8/30/18 9:28:13
**** END ****
SENATE THIRD READING
STR Bill Id:SB 1131
Author:(Hertzberg)
As Amended Ver:August 24, 2018
Majority vote
SENATE VOTE: 36-0
Committee | Votes | Ayes | Noes |
Utilities | 13-0 | Holden, Burke, Chen, Eggman, Gallagher, Eduardo Garcia, Mayes, Muratsuchi, Quirk, Reyes, Santiago, Ting, Friedman | |
Appropriations | 12-0 | Gonzalez Fletcher, Bloom, Bonta, Calderon, Carrillo, Chau, Eggman, Friedman, Eduardo Garcia, Nazarian, Quirk, Reyes |
SUMMARY: Establishes new requirements and timelines for the California Public Utilities Commission (CPUC) review of custom energy efficiency projects for customers of electrical and gas corporations (IOUs). Specifically, this bill:
- Mandates the adoption of criteria and metrics related to custom energy efficiency projects for industrial, agricultural, commercial, residential, and public sector customers and requires that the savings from these programs count toward the overall energy efficiency goals or targets required of IOUs or other program administrators.
- Requires the CPUC to develop and maintain eligibility criteria and other metrics for custom review projects; circulate new or modified rules for public review and comment within specified timelines; and prohibits the CPUC from applying new criteria or metrics to projects pending or previously approved.
- Establishes a clear structure and timeframe for the CPUC to make a determination of whether a pending custom project will be reviewed by the CPUC; establishes a clear structure and timeframe for the CPUC to complete review of a pending custom project; and requires the CPUC to notify a project applicant and IOU if the pending custom project is rejected or there is a need for modification along with the reasons for the rejection or modification and to make specific recommendations for the conditions under which the project would be approved.
FISCAL EFFECT: According to the Assembly Appropriations Committee, hundreds-of-thousands of dollars annually for CPUC to accommodate and implement new requirements to the custom measures program.
COMMENT:
Custom Project Review Process. Custom measures and projects are energy efficiency efforts where the customer's financial incentive and the ex ante energy savings are determined using a site-specific analysis of the customer's existing and proposed equipment, and an agreement is made with the customer to pay the financial incentive upon the completion and verification of the installation. The efforts are by definition unique, each with their own characteristics. Parameters that determine estimated energy savings from a custom measure or project are more variable and less predictable without a site-specific analysis than the more common "deemed measures" for which savings parameters can be predetermined. Because of the uniqueness and size of each project the CPUC has established a process to review the project – custom review.
The IOU reviews the project to ensure the project meets certain criteria and submits the project to the CPUC for review. To ensure that the IOUs are appropriately reviewing projects, the CPUC selects a small number for additional review. Projects that would require a large amount of incentives or provide large amounts of savings are prioritized. After the CPUC completes its review of these selected projects, these projects are either approved or denied. Approved projects receive incentive funds based on the estimated energy savings. Currently, no consistent deadlines exist for obtaining responses on reviews of proposed projects. Industry stakeholders have claimed that the review process is often delayed and methodologies for calculating savings are unclear.
The Log Jam. The program at issue in this bill is commonly referred to as "Custom Review" and is required for proposed energy efficiency projects for very large electricity and gas customers in the commercial, agricultural, and industrial sectors, where the processes they use in daily business are unique and consume large quantities of energy. Consequently, establishing across the board standards for these projects is a challenge and it results in the CPUC's review of individual projects across the state. That's where the hang-up occurs.
The fundamental issue addressed by the author is this unpredictable process of review. The CPUC requires these projects to go into "custom review" but few seem to come out on a timely basis. Projects go on the list but rarely come back. Indeed the larger the savings, the larger the customer, the more unique the efficiency measures, and the larger the cost. Efficiency doesn't come off the shelf for these projects. It requires engineering and sophisticated and specialized contractors to plan and evaluate the applicable efficiency measures and expected energy savings.
The custom review process too often results in missed opportunities to reduce substantial energy use in the commercial, industrial, and agricultural sectors as projects are delayed or abandoned because (the customer tires of the bureaucracy). Typically other planned improvements to the business site which must be done (and therefore there was an opportunity to incorporate efficiency measures) must go forward without the efficiencies.
Micro-Managing Energy Efficiency. There are many different types of energy efficiency efforts. The programs most of us routinely encounter (whether we know it or not) are Title 20 appliance efficiency standards which dictate technical requirements of manufacturers of products sold in this state. The second is Title 24 energy efficiency building standards.
The problem with custom review projects has existed for many years. Since 2015 rulings and decisions in the CPUC's Rolling Portfolio proceeding, which governs energy efficiency, acknowledge that there are several mechanics of the custom review process that require change. Administrative proceedings have received comments, working groups have been convened, and resolutions have been issued. Yet there still has been little done to address the issues.
On the review of custom projects, the most recent comments made in a scoping ruling to the Rolling Portfolio indicate that they will "allow stakeholder input on the custom review process, and the development of a streamlined approach." The only action that has occurred is that CPUC staff has developed "a protocol for timely exchange of documentation" and other aspects of streamlining will be discussed in 2018.
This bill establishes in statute a very proscriptive process of review by the CPUC for any proposed custom energy efficiency project for customers of the IOUs. Generally this level of detail in statute would be discouraged as inappropriately tying the hands of an agency. However, in this instance, supporters have made several attempts to work with the CPUC over several years to make the program work. Nevertheless, proposed efficiency projects are submitted by IOUs to the CPUC for review and sit…sometimes for months.
It is not clear how an efficiency program can run efficiently when one agency tries to review individual projects in a state the size of California. Setting that issue aside, if it's going to occur, the agency must respond in a reasonable time frame or let the project go forward. This is the primary purpose of this bill.
Analysis Prepared by: Kellie Smith / U. & E. / (916) 319-2083 FN: 0004851
SENATE THIRD READING
STR Bill Id:
Author:(Hertzberg)
As Amended Ver:August 20, 2018
Majority vote
SENATE VOTE: 36-0
Committee | Votes | Ayes | Noes |
Utilities | 13-0 | Holden, Burke, Chen, Eggman, Gallagher, Eduardo Garcia, Mayes, Muratsuchi, Quirk, Reyes, Santiago, Ting, Friedman | |
Appropriations | 12-0 | Gonzalez Fletcher, Bloom, Bonta, Calderon, Carrillo, Chau, Eggman, Friedman, Eduardo Garcia, Nazarian, Quirk, Reyes |
SUMMARY: Establishes new requirements and timelines for the California Public Utilities Commission (CPUC) review of custom energy efficiency projects for customers of electrical and gas corporations (IOUs). Specifically, this bill:
- Mandates the adoption of criteria and metrics related to custom energy efficiency projects for industrial, agricultural, commercial, residential, and public sector customers and requires that the savings from these programs count toward the overall energy efficiency goals or targets required of IOUs or other program administrators.
- Requires the CPUC to develop and maintain eligibility criteria and other metrics for custom review projects; circulate new or modified rules for public review and comment within specified timelines; and prohibits the CPUC from applying new criteria or metrics to projects pending or previously approved.
- Establishes a clear structure and timeframe for the CPUC to make a determination of whether a pending custom project will be reviewed by the CPUC; establishes a clear structure and timeframe for the CPUC to complete review of a pending custom project; and requires the CPUC to notify a project applicant and IOU if the pending custom project is rejected or there is a need for modification along with the reasons for the rejection or modification and to make specific recommendations for the conditions under which the project would be approved.
FISCAL EFFECT: According to the Assembly Appropriations Committee, hundreds-of-thousands of dollars annually for CPUC to accommodate and implement new requirements to the custom measures program.
COMMENT:
Custom Project Review Process. Custom measures and projects are energy efficiency efforts where the customer's financial incentive and the ex ante energy savings are determined using a site-specific analysis of the customer's existing and proposed equipment, and an agreement is made with the customer to pay the financial incentive upon the completion and verification of the installation. The efforts are by definition unique, each with their own characteristics. Parameters that determine estimated energy savings from a custom measure or project are more variable and less predictable without a site-specific analysis than the more common "deemed measures" for which savings parameters can be predetermined. Because of the uniqueness and size of each project the CPUC has established a process to review the project – custom review.
The IOU reviews the project to ensure the project meets certain criteria and submits the project to the CPUC for review. To ensure that the IOUs are appropriately reviewing projects, the CPUC selects a small number for additional review. Projects that would require a large amount of incentives or provide large amounts of savings are prioritized. After the CPUC completes its review of these selected projects, these projects are either approved or denied. Approved projects receive incentive funds based on the estimated energy savings. Currently, no consistent deadlines exist for obtaining responses on reviews of proposed projects. Industry stakeholders have claimed that the review process is often delayed and methodologies for calculating savings are unclear.
The Log Jam. The program at issue in this bill is commonly referred to as "Custom Review" and is required for proposed energy efficiency projects for very large electricity and gas customers in the commercial, agricultural, and industrial sectors, where the processes they use in daily business are unique and consume large quantities of energy. Consequently, establishing across the board standards for these projects is a challenge and it results in the CPUC's review of individual projects across the state. That's where the hang-up occurs.
The fundamental issue addressed by the author is this unpredictable process of review. The CPUC requires these projects to go into "custom review" but few seem to come out on a timely basis. Projects go on the list but rarely come back. Indeed the larger the savings, the larger the customer, the more unique the efficiency measures, and the larger the cost. Efficiency doesn't come off the shelf for these projects. It requires engineering and sophisticated and specialized contractors to plan and evaluate the applicable efficiency measures and expected energy savings.
The custom review process too often results in missed opportunities to reduce substantial energy use in the commercial, industrial, and agricultural sectors as projects are delayed or abandoned because (the customer tires of the bureaucracy). Typically other planned improvements to the business site which must be done (and therefore there was an opportunity to incorporate efficiency measures) must go forward without the efficiencies.
Micro-Managing Energy Efficiency. There are many different types of energy efficiency efforts. The programs most of us routinely encounter (whether we know it or not) are Title 20 appliance efficiency standards which dictate technical requirements of manufacturers of products sold in this state. The second is Title 24 energy efficiency building standards.
The problem with custom review projects has existed for many years. Since 2015 rulings and decisions in the CPUC's Rolling Portfolio proceeding, which governs energy efficiency, acknowledge that there are several mechanics of the custom review process that require change. Administrative proceedings have received comments, working groups have been convened, and resolutions have been issued. Yet there still has been little done to address the issues.
On the review of custom projects, the most recent comments made in a scoping ruling to the Rolling Portfolio indicate that they will "allow stakeholder input on the custom review process, and the development of a streamlined approach." The only action that has occurred is that CPUC staff has developed "a protocol for timely exchange of documentation" and other aspects of streamlining will be discussed in 2018.
This bill establishes in statute a very proscriptive process of review by the CPUC for any proposed custom energy efficiency project for customers of the IOUs. Generally this level of detail in statute would be discouraged as inappropriately tying the hands of an agency. However, in this instance, supporters have made several attempts to work with the CPUC over several years to make the program work. Nevertheless, proposed efficiency projects are submitted by IOUs to the CPUC for review and sit…sometimes for months.
It is not clear how an efficiency program can run efficiently when one agency tries to review individual projects in a state the size of California. Setting that issue aside, if it's going to occur, the agency must respond in a reasonable time frame or let the project go forward. This is the primary purpose of this bill.
Analysis Prepared by: Kellie Smith / U. & E. / (916) 319-2083 FN: 0004378
Date of Hearing: August 8, 2018
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez Fletcher, Chair
SBPCA Bill Id:SB 1131
Author:(Hertzberg) – As Amended Ver:July 3, 2018
Policy Committee: | Utilities and Energy | Vote: | 13 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill requires the California Public Utilities Commission (CPUC) to allow electrical and gas investor-owned utilities (IOUs) to provide incentives and assistance to their customers to increase the energy efficiency of agricultural, commercial, industrial, public sector, and residential customers based on reductions in normalized metered energy consumption (NMEC).
The bill also directs the CPUC to develop rules for “custom energy efficiency projects” and other energy efficiency programs, which shall require the CPUC to develop and maintain eligibility criteria or other metrics for determining whether a project is eligible for energy efficiency program funding. The bill specifies that the CPUC may apply changes to previously adopted eligibility criteria and metrics only prospectively, meaning the CPUC shall not apply such changes retroactively to projects already pending approval or already approved.
In addition, the bill makes numerous requirements of CPUC administration and oversight of customer energy efficiency projects, including provisions regarding public review of proposed eligibility criteria and proposed changes to those rules; requiring the IOUs to maintain a custom measure project archive that allows interested parties to determine a project applications status; timelines within which the CPUC is to select a project for review and within which it must complete any such review; and notification timeframe and content requirements the CPUC must follow when it determines a project application to be deficient or when it rejects a project or requests modifications.
FISCAL EFFECT:
The CPUC contends the requirements of this bill will entail significant new workload. Specifically, the CPUC estimates implementation of the bill will require just over $915,000 for five new full-time positions and a small amount of consulting costs. The CPUC identifies the following new activities that would result from implementation of this bill:
- Adjust the energy efficiency goals and targets of an IOU resulting from the increase in the energy efficiency of residential, commercial, industrial, agricultural, and public-sector processes, facilities, systems, and equipment based NMEC that the CPUC did not account for when it initially established those goals and targets.
- Develop and maintain eligibility criteria or other metrics for determining whether a project is eligible for funding pursuant to the custom program.
- Develop and maintain requirements for project application information to be included in the IOUs’ custom projects archives.
- Adhere to timelines for custom project review.
- Support economic, policy, and technical analyses and research.
- Conduct workshops and webinars to solicit stakeholder comments.
It is difficult to assess the accuracy of CPUC’s cost estimate. An argument could be made that the CPUC already administers a program that develops rules for and reviews custom projects. This bill, however, makes numerous and specific requirements of how the CPUC administers the program. It is reasonable to assume it will take substantial resources—possibly in the hundreds-of-thousands of dollars annually—for CPUC to accommodate and implement those new requirements.
COMMENTS:
- Purpose. The author and sponsors (The California Efficiency and Demand Management Council) complain the CPUC’s process for review of custom projects is opaque and unpredictable, which results in considerable lost time and money contending with bureaucracy. Worse, they assert, the CPUC’s process results in clients abandoning or forgoing energy efficiency projects, thereby robbing California of cost-effective energy efficiency savings. They intend this bill clarify program requirements and timelines so that customers can plan and complete custom energy efficiency projects.
- Background. The “loading order” guides the state’s energy policies and decisions according to the following order of priority: (a) decreasing energy demand by increasing energy efficiency; (b) responding to energy demand by reducing energy usage during peak hours; (c) meeting new energy generation needs with renewable resources; and (d) meeting new energy generation needs with clean fossil-fueled generation. This policy has been adopted by the energy agencies – the California Energy Commission (CEC) and CPUC – and its principles guide all energy programs. Consistent with the loading order, statute requires both electrical and gas IOUs to meet unmet resource needs with all available energy efficiency and demand reduction that is cost-effective, reliable, and feasible.
The CPUC uses these criteria to establish energy efficiency targets for the IOUs. To achieve these targets, the IOUs (and, in some cases, community choice aggregators) administer energy efficiency programs with ratepayer funds approved by the CPUC. Currently funded at about $1 billion per year, the programs include a portfolio of financial incentives, loans, and rebates for installing energy efficient appliances, lighting, windows, HVAC systems, whole-house retrofits, and sector-specific efforts.
According to existing CPUC rules, each IOU claims credit for energy savings from the portfolio of energy efficiency measures in its energy efficiency program. The CPUC evaluates the claimed energy savings and, after adjustment, authorizes financial rewards for the IOU. Traditionally, the CPUC has measured claimed savings against a baseline, which the CPUC generally defines as being comprised of three factors: (a) “naturally occurring savings,” (b) standard industry practice and (c) the CEC’s Title 24 energy efficiency standards for existing buildings. The CPUC sets the baseline at a level meant to avoid “free ridership,” that is, credit for energy savings that would have occurred absent the IOUs’ energy efficiency programs.
Generally, the CPUC establishes standards that assume the energy efficiency savings for a given class of project. This is because, in many cases, it is easy to accurately estimate the energy efficiency effects of a standard project. For projects to be installed by large industrial, commercial, or agricultural customers, however, the process is oftentimes not so straight-forward. This is because the needs of such customers are often unique. The energy efficiency projects contemplated by these customers cannot be achieved by use of standard, off-the-shelf products. Rather, these customers often pursue custom projects that satisfy their unique needs.
To evaluate the eligibility of custom projects for energy efficiency incentives and the energy savings realized by such projects, the CPUC has developed the custom project review process (custom process). The process is somewhat convoluted, but, in summary, it involves the following steps:
- Project development by the customer.
- Project selection by the IOU.
- Project submission by IOU to CPUC.
- CPUC ex ante review, in which the CPUC selects a small number of projects–the CPUC says approximately 1% of projects submitted—to check for eligibility, compliance with program rules, accuracy and comprehensiveness of savings estimates, proposed incentives, estimated project costs, program influence, baseline assignment, and measurement and verification plans.
- Post-installation review, which, again, CPUC says includes a very small number of projects.
Stakeholders have complained for a number of years that the custom review process is unpredictable and slow. Stakeholders report customers who, waiting for final approval from the CPUC, have given up pursuit of an energy efficiency component of a larger upgrade project. Such outcomes are unfortunate for a number of reasons, not the least of which is failure to advance California’s ambitious energy efficiency goals.
The CPUC has acknowledged problems with the custom review process. Indeed, the CPUC has convened a stakeholder process to identify problems with the program and possible solutions. And it seems, based on information provided to the committee by the CPUC that the CPUC and the author and sponsors are not too far from agreement on how, in very general terms, to improve to the process, though the CPUC places greater emphasis on the role of the IOUs. With any luck, the author, sponsors, and CPUC will soon come to agreement. Fingers crossed.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: June 27, 2018
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Chris Holden, Chair
SBPCA Bill Id:SB 1131
Author:(Hertzberg) – As Amended Ver:June 13, 2018
SENATE VOTE: 36-0
SUBJECT: Electrical and gas corporations: energy efficiency: financing options: industrial and agricultural processes: custom projects
SUMMARY: Requires the California Public Utilities Commission (CPUC) to authorize investor-owned utilities (IOUs) incentives for industrial and agricultural energy efficiency projects based on reductions measured by normalized metered energy consumption (NMEC) and establishes new requirements and timelines for the CPUC’s review of custom projects. Specifically, this bill:
- Mandates the adoption of criteria and metrics related to custom energy efficiency projects for industrial, agricultural, commercial residential and public sector customers, requires that all customer projects be able to utilize NMEC to measure savings, and that the savings from these programs count toward the overall energy efficiency goals or targets required of IOUs or other program administrators.
- Requires the CPUC to develop and maintain eligibility criteria or metrics and circulate new or modified rules for public review and comment within specified timelines.
- Requires IOUs to maintain an archive of previously approved custom projects and other programs.
- Prohibits the CPUC from applying new criteria or metrics to projects pending or previously approved.
- Mandates rate recovery for IOUs for the reasonable costs of energy efficiency programs.
- Requires the CPUC, within 30 days of notice of a project from an IOU, to make a determination of whether a custom project will be reviewed by the CPUC and requires the CPUC to complete which review within 30 days of submission of the project according to rules, metrics and criteria in effect at the time the project application was submitted. If a project is rejected by the CPUC, requires detailed notices of deficiencies in the project application. If a project is not selected for review within 30 days, the project is deemed approved.
- Requires the CPUC to adopt rules for a dispute resolution process for an IOU or customer to challenge the rejection of a project application.
- Allows IOUs to rely on forecasted energy savings when entering into customer incentive agreements for approved projects, projects not selected for custom review, or that were not reviewed within the prescribed timelines.
- Permits the CPUC to later review projects and to obtain information on the project to determine whether eligibility criteria
- Ensures that CPUC is not limited from evaluating projects or programs for the purpose of prospectively adjusting projects or programs for industrial and agricultural processes,
- Expresses the intent of the Legislature that the CPUC implement this section by establishing applicable rules, within a reasonable period of time and in an open process, that are clear and operate on a prospective basis.
EXISTING LAW:
- Requires the California Energy Commission (CEC) to establish a comprehensive program to achieve greater energy savings in California’s existing building stock. (Public Resources Code § 25943)
- Creates a charge on electricity and natural gas consumption to fund cost-effective energy efficiency and conservation activities. (Public Utilities Code § 381 and § 890)
- Requires the CPUC to identify all potentially achievable, cost-effective electricity and natural gas efficiency savings and establish energy efficiency targets and ratepayer-funded programs for IOUs. Requires a gas corporation to first meet its unmet resource needs through all available natural gas efficiency and demand reduction resources that are cost effective, reliable, and feasible. (Public Utilities Code §§ 454.55 and 454.56)
- Requires the CPUC to authorize an IOU to provide incentives for the cost of energy efficiency programs based on all estimated energy savings, including energy savings from bringing existing buildings into compliance with mandatory energy efficiency codes for existing buildings issued by the CEC, and authorizes an IOU to recover the costs in rates. Directs the CPUC to allow an IOU to take into consideration the overall reduction in NMEC as a measure of energy savings of the IOU’s energy efficiency program. States that the CPUC may adjust the energy efficiency procurement targets to reflect energy efficiency savings achieved in meeting or exceeding mandatory energy efficiency codes for existing buildings. (Public Utilities Code § 381.2)
FISCAL EFFECT: According to the Senate Appropriations Committee, the CPUC indicates that it would incur ongoing annual costs of $712,000 (ratepayer funds) to implement the provisions of this bill. The CPUC would require four new permanent positions to adjust energy efficiency goals and targets for utilities to reflect new information that was not considered when the original goals and targets were considered, create program application process and project eligibility criteria, staff a rulemaking for new procedures and evaluation criteria, and conduct workshops and webinars.
BACKGROUND:
Custom Project Review Process – Custom measures and projects are energy efficiency efforts where the customer’s financial incentive and the ex ante energy savings are determined using a site-specific analysis of the customer’s existing and proposed equipment, and an agreement is made with the customer to pay the financial incentive upon the completion and verification of the installation. The efforts are by definition unique, each with their own characteristics. Parameters that determine estimated energy savings from a custom measure or project are more variable and less predictable without a site-specific analysis than the more common “deemed measures” for which savings parameters can be predetermined. Because of the uniqueness and size of each project the CPUC has established a process to review the project – custom review.
The IOU reviews the project to ensure the project meets certain criteria and submits the project to the CPUC for review. To ensure that the utilities are appropriately reviewing projects, the CPUC selects a small number of projects for additional review. Projects that would require a large amount of incentives or provide large amounts of savings are prioritized. After the CPUC completes its review of these selected projects, these projects are either approved or denied. Approved projects receive incentive funds based on the estimated energy savings. Currently, no consistent deadlines exist for obtaining responses on reviews of proposed projects. Industry stakeholders have claimed that the review process is often delayed and methodologies for calculating savings are unclear.
Normalized Metered Energy Consumption – This bill requires the CPUC to authorize IOUs to provide financial incentives, rebates, technical assistance, and support a wide range of energy efficiency measures implemented by any type of customer based on reductions in NMEC. NMEC is a methodology used to calculate energy savings achieved through the implementation of an energy efficiency measure or project. NMEC is intended to provide a clear mechanism to identify the savings achieved by measuring the real savings achieved based on the customer’s reduction in energy use measured at the meter. The data can be “normalized” to help identify the extent to which a project or measure led to savings that would not otherwise have occurred.
While NMEC provides significant benefits, including emphasizing achieving savings significant enough to be measured via metered energy, the CPUC has limited use of NMEC opining that it may not be appropriate for all energy efficiency projects. Since industrial and agricultural are highly customized and savings are difficult to normalize, using NMEC for efficiency projects in these buildings may be challenging according to the CPUC.
AB 802 (Williams, Chapter 590, Statutes of 2015) established a mechanism for evaluating the energy savings achieved by energy efficiency projects, including projects for commercial buildings. This evaluation uses NMEC and establishes a baseline that can be used to measure energy savings against the baseline. Currently, this methodology is not applied to agricultural and industrial buildings due to their customized nature. This bill requires the CPUC to calculate energy efficiency savings from industrial and agricultural projects using the NMEC methodology created by AB 802.
COMMENTS:
- Author’s Statement. According to the author, with varying industrial businesses and agricultural productions in California, it is not as explicit in the outset of a project under AB 802, what it means to have achieved energy efficiency. The lack of transparency from CPUC through this project analysis discourages applicants and leaves significant energy savings stranded. Achieving our state’s pioneering energy goals necessitates that we include all users. This includes the industrial facilities and agricultural equipment where we can capture the most energy savings and lead to reduced greenhouse gas emissions.
- The Log Jam. The program at issue in this bill is commonly referred to as “Custom Review” and is required for proposed energy efficiency projects for very large electricity and gas customers in the commercial, agricultural, and industrial sectors, where the processes they use in daily business are unique and consume large quantities of energy. Consequently, establishing across the board standards for these projects is a challenge and it results in the CPUC’s review of individual projects across the state. That’s where the hang-up occurs.
The fundamental issue addressed by the author is this unpredictable process of review, The CPUC requires these projects to go into “custom review” but few seem to come out on a timely basis. Projects go on the list but rarely come back. Indeed the larger the savings, the larger the customer, the more unique the efficiency measures, and the larger the cost. Efficiency doesn’t come off the shelf for these projects. It requires engineering and sophisticated and specialized contractors to plan and evaluate the applicable efficiency measures and expected energy savings.
The custom review process too often results in missed opportunities to reduce substantial energy use in the commercial, industrial, and agricultural sectors as projects are delayed or abandoned because (the customer tires of the bureaucracy). Typically other planned improvements to the business site which must be done (and therefore there was an opportunity to incorporate efficiency measures) must go forward without the efficiencies.
- Micro-Managing Energy Efficiency. There are many different types of energy efficiency efforts. The programs most of us routinely encounter (whether we know it or not) are Title 20 appliance efficiency standards which dictate technical requirements of manufacturers of products sold in this state. The second is Title 24 energy efficiency building standards.
The problem with custom review projects has existed for many years. Since 2015 rulings and decisions in the CPUC’s Rolling Portfolio proceeding which governs energy efficiency acknowledge that there are several mechanics of the custom projects that require change. Administrative proceedings have received comments, working groups have been convened, and resolutions have been issued. Yet there still has been little done to address the issues.
On the review of custom projects, the most recent comments made in a scoping ruling to the Rolling Portfolio indicate that they will “allow stakeholder input on the custom review process, and the development of a streamlined approach.” The only action that has occurred is that CPUC staff has developed “a protocol for timely exchange of documentation” and other aspects of streamlining will be discussed in 2018.
This bill establishes in statute a very proscriptive process of review by the CPUC for any proposed custom energy efficiency project for customers of the IOUs. Generally committee staff would suggest to members that this level of detail in statute inappropriately ties the hands of an agency. However, in this instance, supporters have made several attempts to work with the CPUC over several years to make the program work. Nevertheless, proposed efficiency projects are submitted by IOUs to the CPUC for review and sit…sometimes for months.
We first question how an efficiency program can run efficiently when one agency tries to review individual projects in a state the size of California. Setting that issue aside, if it’s going to occur, the agency must respond in a reasonable time frame or let the project go forward. This is the primary purpose of this bill.
- Normalized Metered Energy Consumption. Savings for custom review projects have historically been estimated at the front end of a project and utilized extensive engineering for each project. In 2015 the Legislature called for a new measurement of savings – normalized metered energy consumption – where actual savings would be measured based on the actual use of energy by the consumer after the efficiency measures have been instituted. A strict comparison of the meter before and after cannot generally be used. The metered savings must be adjusted (aka normalized) for changes in weather and production, for instance.
The 2015 legislation directed the CPUC to incorporate NMEC in energy efficiency programs and directed the IOUs to immediately file plans for “high opportunity projects and programs” utilizing NMEC. The filings occurred but the use of NMEC has been limited. CPUC actions have also limited use to energy in the building sector and so NMEC has not been made available to agricultural and industrial processes.
This bill mandates that NMEC be used to “provide financial incentives, rebates, technical assistance, and support to their customers to increase the energy efficiency of industrial, agricultural, commercial, residential, and public sector customers based on energy savings measured at the meter. The bill states that the CPUC shall authorize; the bill doesn’t mandate that this tool be applied to each and every energy efficiency program for every customer in those programs.
- Legislative Ratemaking. The Public Utilities Code provides the CPUC with full and complete authority to provide cost recovery to the regulated utilities, or not, if it finds costs to be just and reasonable. This bill adds language that mandates cost recovery in rates if the CPUC finds the costs reasonable. This provision is not necessary, could be construed as somehow changing the CPUC’s current ratemaking authority, and could fall in to the category of legislative ratemaking which has been historically avoided. The committee may wish to consider striking this section.
- Related Legislation.
SB 370 (Hertzberg) would have required the CPUC to authorize IOU incentives for industrial and agricultural energy efficiency projects based on NMEC. The bill would also have established requirements and timelines for the CPUC review of project eligibility for incentives. Status: Held in Senate Appropriations Committee.
- Prior Legislation.
AB 802 (Williams) required the CPUC to authorize IOU incentives and assistance for building energy efficiency measures that support the CEC’s energy efficiency standards for existing buildings and to allow IOUs to recover reasonable costs of those incentives and assistance through rates. (Chapter 590, Statutes of 2015)
SB 350 (De León) the Clean Energy and Pollution Reduction Act of 2015, established new clean energy, clean air and GHG reduction goals. Specifically, the bill established a goal to double energy efficiency in existing buildings by 2030 and directs the CPUC to authorize energy efficiency program to meet the goal. (Chapter 547, Statutes of 2015)
AB 758 (Skinner) required the CEC to work with the CPUC and stakeholders to develop a comprehensive program to achieve greater energy efficiency in existing buildings. (Chapter 470, Statutes 2009)
REGISTERED SUPPORT / OPPOSITION:
Support
California Efficiency + Demand Management Council (Sponsor)
Advanced Energy Economy
California Business Properties Association
California Farm Bureau Federation
California Food Producers
California Large Energy Consumers Association
California Manufacturers & Technology Association
California State Association Of Electrical Workers
California State Pipe Trades Council
Coalition Of California Utility Employees
International Union Of Elevator Constructors
NAIOP Of California
National Federation Of Independent Business (NFIB)
Natural Resources Defense Council
Western States Council Of Sheet Metal Workers
Opposition
None on file.
Analysis Prepared by: Kellie Smith / U. & E. /
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB |
THIRD READING
Bill No: SB 1131
Amended: 5/25/18
SENATE ENERGY, U. & C. COMMITTEE: 10-0, 4/25/18
AYES: Hueso, Bradford, Cannella, Hertzberg, Hill, McGuire, Skinner, Stern, Vidak, Wiener
NO VOTE RECORDED: Morrell
SENATE APPROPRIATIONS COMMITTEE: 7-0, 5/25/18
AYES: Lara, Bates, Beall, Bradford, Hill, Nielsen, Wiener
SUBJECT: Electrical and gas corporations: energy efficiency: financing options: industrial and agricultural processes: custom projects
SOURCE: California Efficiency and Demand Management Council
DIGEST:
This bill requires the California Public Utilities Commission (CPUC) to authorize investor-owned utilities (IOUs) incentives for industrial and agricultural energy efficiency projects based on reduction in normalized metered energy consumption (NMEC) and establishes new requirements and timelines for the CPUC’s review of these projects.
Existing law:
- Requires the California Energy Commission (CEC) to establish a comprehensive program to achieve greater energy savings in California’s existing building stock. (Public Resources Code §25943)
- Creates a charge on electricity and natural gas consumption to fund cost-effective energy efficiency and conservation activities. (Public Utilities Code §381 and §890)
- Requires the CPUC to identify all potentially achievable, cost-effective electricity and natural gas efficiency savings and establish energy efficiency targets and ratepayer-funded programs for IOUs. Requires a gas corporation to first meet its unmet resource needs through all available natural gas efficiency and demand reduction resources that are cost effective, reliable, and feasible. (Public Utilities Code §454.55 and §454.56.)
- Requires the CPUC to authorize an IOU to provide incentives for the cost of energy efficiency programs based on all estimated energy savings, including energy savings from bringing existing buildings into compliance with mandatory energy efficiency codes for existing buildings issued by the CEC, and authorizes an IOU to recover the costs in rates. Directs the CPUC to allow an IOU to take into consideration the overall reduction in NMEC as a measure of energy savings of the IOU’s energy efficiency program. States that the CPUC may adjust the energy efficiency procurement targets to reflect energy efficiency savings achieved in meeting or exceeding mandatory energy efficiency codes for existing buildings. (Public Utilities Code §381.2)
This bill:
- Requires the CPUC to authorize IOU incentives for industrial and agricultural energy efficiency projects based on reduction in NMEC.
- Allows electrical and gas corporations to recover reasonable costs of these programs through ratepayers and specifies that energy savings achieved from the programs will count towards CPUC energy efficiency goals for these utilities.
- Requires the CPUC to adopt rules for industrial and agricultural energy efficiency projects, which ensure that the CPUC’s energy division develops and maintains eligibility criteria or other metrics for determining a project’s funding eligibility.
- Establishes a specific public process for the CPUC’s adoption of funding eligibility criteria, including timelines for public review and responses to comments. Adopted eligibility criteria will apply only on a prospective basis and cannot be applied to pending or approved project applications.
- Requires the rules adopted by the CPUC to include requirements for electrical and gas corporations to maintain customer project archives, and they must specify the material included in these archives. These archives must include information about project applications.
- Establishes a process the CPUC must follow for reviewing projects’ eligibility, including specified timelines for reviewing applications, specific information that must be included in notifications about eligibility determinations, and a dispute resolution process.
- Allows projects to proceed as if they had been approved in circumstances where the CPUC has not selected the project for review within the required timeline.
Background
Doubling energy efficiency. Existing law requires the CEC to create energy efficiency targets that enable the state to double energy efficiency savings from electricity and natural gas end uses by 2030, to the extent that doing so is cost-effective, feasible, and does not negatively impact public health and safety. The CEC’s Doubling Energy Efficiency Savings by 2030 final report identifies these industries’ electricity and natural gas consumption and notes that they could contribute to significant energy savings. The agricultural sector contributes a little less than seven percent of the state’s electricity use and approximately one percent of the statewide natural gas consumption. The industrial sector uses approximately 15 percent of the state’s electricity and 28 percent of its natural gas. The CEC’s report states, “This sector has significant untapped potential for energy savings. A central challenge in tapping those savings is that each industry has unique situations and proprietary information.”
Under existing law, IOUs are authorized to provide industrial and agricultural customers with incentives to make improvements that result in energy savings. The CPUC provides guidance as efficiency projects are developed. The IOU reviews the project to ensure the project meets certain criteria and submits the project to the CPUC for review. To ensure that the utilities are appropriately reviewing projects, the CPUC selects a small number of projects for additional review. Projects that would require a large amount of incentives or provide large amounts of savings are prioritized. After the CPUC completes its review of these selected projects, these projects are either approved or denied. Approved projects receive incentive funds based on the estimated energy savings. Currently, no consistent deadlines exist for obtaining responses on reviews of proposed projects. Industry stakeholders have claimed that the review process is often delayed and methodologies for calculating savings are unclear.
Normalized metered energy consumption. This bill requires the CPUC to authorize IOUs to provide financial incentives, rebates, technical assistance, and support a wide range of energy efficiency measures implemented by industrial and agriculture customers based on reductions in NMEC. NMEC is a methodology used to calculate energy savings achieved through the implementation of an energy efficiency measure or project. NMEC is intended to provide a clear mechanism to identify the savings achieved by measuring the real savings achieved in metered energy. The data can be “normalized” to help identify the extent to which a project or measure led to savings that would not otherwise have occurred.
While NMEC provides significant benefits, including emphasizing achieving savings significant enough to be measured via metered energy, NMEC may not be appropriate for all energy efficiency projects. Generally, NMEC works best in buildings that display predictable energy use patterns. Since industrial and agricultural are highly customized and savings are difficult to normalize, using NMEC for efficiency projects in these buildings may be challenging.
AB 802 (Williams, Chapter 590, Statutes of 2015) established a mechanism for evaluating the energy savings achieved by energy efficiency projects, including projects for commercial buildings. This evaluation uses NMEC and establishes a baseline that can be used to measure energy savings against the baseline. Currently, this methodology is not applied to agricultural and industrial buildings due to their customized nature. This bill requires the CPUC to calculate energy efficiency savings from industrial and agricultural projects using the NMEC methodology created by AB 802.
Ongoing process improvements with stakeholders. Both the CPUC and the industry representatives for the industrial and agricultural sectors have acknowledged that the process for reviewing industrial and agricultural efficiency projects needs additional clarity. Specifically, industry representatives have sought more predictable review timelines, criteria for evaluation, and consistent information on how a project can obtain incentive eligibility criteria. Between May and August 2017, the CPUC convened stakeholder meetings with the Track 2 Working Group to explore opportunities to streamline review processes and eligibility determinations. Based on recommendations from the stakeholder meetings, the CPUC and IOUs identified and started implementing a number of steps to improve the guidance and review process for custom efficiency projects. The CPUC is continuing to hold meetings with stakeholders to ensure transparency and reduce ambiguity. However, some members of the industrial and agricultural sector have sought additional methods for ensuring that their projects are eligible for ratepayer funded incentives.
Models for industrial and agricultural efficiency programs. Other methodologies exist for estimating savings from efficiency measures in industrial and agricultural buildings, including strategic energy management models. These models evaluate existing energy management business practices and identify opportunities to optimize energy use at industrial and manufacturing companies. The CPUC authorized strategic energy management programs for industrial customers through a 2016 order on energy efficiency programs (D.16-08-019). The decision allows the use of metered consumption data to calculate savings from behavioral, retrocommissioning, and operational efficiency activities. IOUs started implementing industrial strategic energy management programs in the first quarter of 2018.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
According to the Senate Appropriations Committee, CPUC indicates that it would incur ongoing annual costs of $712,000 (ratepayer funds) to implement the provisions of this bill. CPUC would require four new permanent positions to adjust energy efficiency goals and targets for utilities to reflect new information that was not considered when the original goals and targets were considered, create program application process and project eligibility criteria, staff a rulemaking for new procedures and evaluation criteria, and conduct workshops and webinars.
California Efficiency and Demand Management Council (source)
Advanced Energy Economy
California Farm Bureau Federation
California Food Producers
California Large Energy Consumers Association
California League of Food Producers
California Manufacturers & Technology Association
California State Association of Electrical Workers
California State Pipe Trades Council
Clean Power Campaign
Coalition of California Utility Employees
International Union of Elevator Constructors
National Association of Energy Service Companies
Natural Resources Defense Council
NFIB
Silicon Valley Leadership Group
Western States Council of Sheet Metal Workers
OPPOSITION: (Verified 5/23/18)
None received
ARGUMENTS IN SUPPORT: According to the author, “Achieving our state’s pioneering energy goals necessitates that we include all users. This includes the industrial facilities and agricultural equipment where we can capture the most energy savings and lead to reduced greenhouse gas emissions.”
5/30/18 15:15:45
**** END ****
SENATE COMMITTEE ON APPROPRIATIONS
Senator Ricardo Lara, Chair
2017 - 2018 Regular Session
SB 1131 (Hertzberg) - Electrical and gas corporations: energy efficiency: financing options: industrial and agricultural processes: custom projects
Version: May 1, 2018 | Policy Vote: E., U., & C. 10 - 0 |
Urgency: No | Mandate: Yes |
Hearing Date: May 25, 2018 | Consultant: Mike Peterson |
Bill Summary:
SB 1131 would (1) require the California Public Utilities Commission (CPUC) to authorize investor owned utilities (IOUs) incentives for industrial and agricultural energy efficiency projects based on reduction in normalized metered energy consumption, and (2) establish new requirements and timelines for the CPUC’s review of these projects.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on May 25, 2018
Fiscal Impact:
CPUC indicates that it would incur ongoing annual costs of $712,000 (ratepayer funds) to implement the provisions of the bill. CPUC would require four new permanent positions to adjust energy efficiency goals and targets for utilities to reflect new information that was not considered when the original goals and targets were considered, create program application process and project eligibility criteria, staff a rulemaking for new procedures and evaluation criteria, and conduct workshops and webinars.
Author Amendments:
Amendments expand deadlines for CPUC actions.
-- END --
SENATE COMMITTEE ON APPROPRIATIONS
Senator Ricardo Lara, Chair
2017 - 2018 Regular Session
SB 1131 (Hertzberg) - Electrical and gas corporations: energy efficiency: financing options: industrial and agricultural processes: custom projects
Version: May 1, 2018 | Policy Vote: E., U., & C. 10 - 0 |
Urgency: No | Mandate: Yes |
Hearing Date: May 22, 2018 | Consultant: Robert Ingenito |
This bill meets the criteria for referral to the Suspense File.
Bill Summary: SB 1131 would (1) require the California Public Utilities Commission (CPUC) to authorize investor owned utilities (IOUs) incentives for industrial and agricultural energy efficiency projects based on reduction in normalized metered energy consumption, and (2) establish new requirements and timelines for the CPUC’s review of these projects.
Fiscal Impact:
CPUC indicates that it would incur ongoing annual costs of $712,000 (ratepayer funds) to implement the provisions of the bill. CPUC would require four new permanent positions to adjust energy efficiency goals and targets for utilities to reflect new information that was not considered when the original goals and targets were considered, create program application process and project eligibility criteria, staff a rulemaking for new procedures and evaluation criteria, and conduct workshops and webinars.
Background:
Current law requires CEC to create energy efficiency targets that enable the State to double energy efficiency savings from electricity and natural gas end uses by 2030, to the extent that doing so is cost-effective, feasible, and does not negatively impact public health and safety. CEC’s Doubling Energy Efficiency Savings by 2030 final report identifies these industries’ electricity and natural gas consumption, and notes that they could contribute to significant energy savings. The agricultural sector contributes about seven percent of the state’s electricity use and one percent of the statewide natural gas consumption. The industrial sector uses 15 percent of the State’s electricity and 28 percent of its natural gas. The CEC’s report states, “This sector has significant untapped potential for energy savings. A central challenge in tapping those savings is that each industry has unique situations and proprietary information.”
Under current law, IOUs are authorized to provide industrial and agricultural customers with incentives to make improvements that result in energy savings. CPUC provides guidance as efficiency projects are developed. The IOU reviews the project to ensure the project meets certain criteria and submits the project to CPUC for review. To ensure that the utilities are appropriately reviewing projects, CPUC selects a small number of projects for additional review. Projects that would require a large amount of incentives or provide large amounts of savings are prioritized. After CPUC completes its review of these selected projects, these projects are either approved or denied. Approved projects receive incentive funds based on the estimated energy savings.
Proposed Law:
This bill would do the following:
- Starting July 1, 2019, require CPUC to authorize IOU incentives for industrial and agricultural energy efficiency projects based on reduction in normalized metered energy consumption (NMEC).
- Specify that eligible projects include those that reduce energy use from the adoption of measures or equipment that meet industry standard practices and retrocommissioning activities expected to achieve multiyear energy savings.
- Allow electrical and gas corporations to recover reasonable costs of these programs through ratepayers and specifies that energy savings achieved from the programs will count towards CPUC energy efficiency goals for these utilities.
- Require CPUC to adopt rules for industrial and agricultural energy efficiency projects, which ensure that CPUC’s energy division develops and maintains eligibility criteria or other metrics for determining a project’s funding eligibility.
- Establish a specific public process for the PUC’s adoption of funding eligibility criteria, including timelines for public review and responses to comments. Adopted eligibility criteria will apply only on a prospective basis and cannot be applied to pending or approved project applications.
- Require the rules adopted by CPUC to include requirements for electrical and gas corporations to maintain customer project archives, and they must specify the material included in these archives.
- Establish a process that CPUC must follow for reviewing projects’ eligibility, including timelines for reviewing applications, specific information that must be included in notifications about eligibility determinations, and a dispute resolution process.
- Allow projects to proceed as if they had been approved in circumstances where the CPUC has not selected the project for review within the required timeline.
Related Legislation:
- SB 370 (Hertzberg, 2017) would have required the CPUC to authorize IOU incentives for industrial and agricultural energy efficiency projects based on NMEC. The bill would also have established requirements and timelines for the CPUC review of projects’ eligibility for incentives. The bill was held under submission on the Suspense File of this Committee.
- AB 802 (Williams, Chapter 590, Statutes of 2015) required CPUC to authorize IOU incentives and assistance for building energy efficiency measures that support CEC’s energy efficiency standards for existing buildings and to allow IOUs to recover reasonable costs of those incentives and assistance through rates.
- SB 350 (De León, Chapter 547, Statutes of 2015) the Clean Energy and Pollution Reduction Act of 2015, established new clean energy, clean air and GHG reduction goals. Specifically, the bill established a goal to double energy efficiency in existing buildings by 2030 and directs the CPUC to authorize energy efficiency program to meet the goal.
Staff Comments:
The Governor's 2018-19 May Revision proposes $30 million in one-time General Fund support for the Agricultural Energy Efficiency program within CEC, half the funding it received during the previous fiscal year. The funds are intended to provide incentives for emissions reductions from food processing facilities. The first round of funding is expected in the fall of 2018. This proposal would be in addition to the January proposal of $34 million in Greenhouse Gas Reduction Fund resources to the program as part of the budget’s Cap-and-Trade expenditure plan.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Ben Hueso, Chair
2017 - 2018 Regular
Bill No: SB 1131 Hearing Date: 4/25/2018
Author: | Hertzberg | ||
Version: | 2/13/2018 As Introduced | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Sarah Smith | ||
SUBJECT: Electrical and gas corporations: energy efficiency: financing options: industrial and agricultural processes: custom projects
DIGEST: This bill requires the CPUC to authorize IOU incentives for industrial and agricultural energy efficiency projects based on reduction in normalized metered energy consumption and establishes new requirements and timelines for the CPUC’s review of these projects.
ANALYSIS:
Existing law:
- Requires the California Energy Commission (CEC) to establish a comprehensive program to achieve greater energy savings in California’s existing building stock. (Public Resources Code §25943)
- Creates a charge on electricity and natural gas consumption to fund cost-effective energy efficiency and conservation activities. (Public Utilities Code §381 and §890)
- Requires the California Public Utilities Commission (CPUC) to identify all potentially achievable, cost-effective electricity and natural gas efficiency savings and establish energy efficiency targets and ratepayer-funded programs for investor-owned utilities (IOUs). Requires a gas corporation to first meet its unmet resource needs through all available natural gas efficiency and demand reduction resources that are cost effective, reliable, and feasible. (Public Utilities Code §454.55 and §454.56.)
- Requires the CPUC to authorize an IOU to provide incentives for the cost of energy efficiency programs based on all estimated energy savings, including energy savings from bringing existing buildings into compliance with mandatory energy efficiency codes for existing buildings issued by the CEC, and authorizes an IOU to recover the costs in rates. Directs the CPUC to allow an IOU to take into consideration the overall reduction in normalized metered energy consumption (NMEC) as a measure of energy savings of the IOU’s energy efficiency program. States that the CPUC may adjust the energy efficiency procurement targets to reflect energy efficiency savings achieved in meeting or exceeding mandatory energy efficiency codes for existing buildings. (Public Utilities Code §381.2)
This bill:
- Requires the CPUC to authorize IOU incentives for industrial and agricultural energy efficiency projects based on reduction in NMEC.
- Specifies that eligible projects include those that reduce energy use from the adoption of measures or equipment that meet industry standard practices and retrocommissioning activities expected to achieve multiyear energy savings.
- Allows electrical and gas corporations to recover reasonable costs of these programs through ratepayers and specifies that energy savings achieved from the programs will count towards CPUC energy efficiency goals for these utilities.
- Requires the CPUC to adopt rules for industrial and agricultural energy efficiency projects, which ensure that the CPUC’s energy division develops and maintains eligibility criteria or other metrics for determining a project’s funding eligibility.
- Establishes a specific public process for the CPUC’s adoption of funding eligibility criteria, including timelines for public review and responses to comments. Adopted eligibility criteria will apply only on a prospective basis and cannot be applied to pending or approved project applications.
- Requires the rules adopted by the CPUC to include requirements for electrical and gas corporations to maintain customer project archives, and they must specify the material included in these archives. These archives must include information about project applications.
- Establishes a process the CPUC must follow for reviewing projects’ eligibility, including timelines for reviewing applications, specific information that must be included in notifications about eligibility determinations, and a dispute resolution process.
- Allows projects to proceed as if they had been approved in circumstances where the CPUC has not selected the project for review within the required timeline.
Background
Doubling energy efficiency. Existing law requires the CEC to create energy efficiency targets that enable the state to double energy efficiency savings from electricity and natural gas end uses by 2030, to the extent that doing so is cost-effective, feasible, and does not negatively impact public health and safety. The CEC’s Doubling Energy Efficiency Savings by 2030 final report identifies these industries’ electricity and natural gas consumption and notes that they could contribute to significant energy savings. The agricultural sector contributes a little less than seven percent of the state’s electricity use and approximately one percent of the statewide natural gas consumption. The industrial sector uses approximately 15 percent of the state’s electricity and 28 percent of its natural gas. The CEC’s report states, “This sector has significant untapped potential for energy savings. A central challenge in tapping those savings is that each industry has unique situations and proprietary information.”
Under existing law, IOUs are authorized to provide industrial and agricultural customers with incentives to make improvements that result in energy savings. The CPUC provides guidance as efficiency projects are developed. The IOU reviews the project to ensure the project meets certain criteria and submits the project to the CPUC for review. To ensure that the utilities are appropriately reviewing projects, the CPUC selects a small number of projects for additional review. Projects that would require a large amount of incentives or provide large amounts of savings are prioritized. After the CPUC completes its review of these selected projects, these projects are either approved or denied. Approved projects receive incentive funds based on the estimated energy savings. Industry stakeholders have claimed that the review process is often delayed and methodologies for calculating savings are unclear.
Track 2 Working Group. Both the CPUC and the industry representatives for the industrial and agricultural sectors have acknowledged that the process for reviewing industrial and agricultural efficiency projects needs additional clarity. Specifically, industry representatives have sought more predictable review timelines, criteria for evaluation, and consistent information on how a project can obtain incentive eligibility criteria. Between May and August 2017, the CPUC convened stakeholder meetings with the Track 2 Working Group to explore opportunities to streamline review processes and eligibility determinations. Based on recommendations from the stakeholder meetings, the CPUC and IOUs identified and started implementing a number of steps to improve the guidance and review process for custom efficiency projects. The CPUC is continuing to hold meetings with stakeholders to ensure transparency and reduce ambiguity. However, some members of the industrial and agricultural sector have sought additional methods for ensuring that their projects are eligible for ratepayer funded incentives.
Normalized metered energy consumption (NMEC). This bill would require the CPUC to authorize IOUs to provide financial incentives, rebates, technical assistance, and support a wide range of energy efficiency measures implemented by industrial and agriculture customers based on reductions in NMEC. NMEC is a methodology used to calculate energy savings achieved through the implementation of an energy efficiency measure or project. NMEC is intended to provide a clear mechanism to identify the savings achieved by measuring the real savings achieved in metered energy. The data can be “normalized” to help identify the extent to which a project or measure led to savings that would not otherwise have occurred.
While NMEC provides significant benefits, including emphasizing achieving savings significant enough to be measured via metered energy, NMEC is not necessarily beneficial for all energy efficiency projects. KW Engineering, a member of the California Efficiency and Demand Management Council, acknowledges that NMEC is not appropriate for all buildings and works best in those that have predictable patterns in energy use. Generally, industrial and agricultural buildings are less likely to exhibit predictable energy use patterns. These buildings usually require highly customized energy efficiency measures to achieve significant savings. The customized nature of these projects can make using NMEC unfeasible. The Natural Resources Defense Council studied mechanisms for pay-for-performance efficiency programs and said, “Even with the best available models and data, some buildings are too variable in their energy usage to establish a well-fitting baseline estimate with smart meter data.”
AB 802 (Williams, Chapter 590, Statutes of 2015) established a mechanism for evaluating the energy savings achieved by energy efficiency projects, including projects for commercial buildings. This evaluation establishes a baseline that can be used to measure energy savings against the baseline. Currently, this methodology is not applied to agricultural and industrial buildings due to the custom nature of agricultural and industrial energy efficiency projects. The NMEC provisions of this bill differ from the baseline methodology created in AB 802. For example, this bill would specifically authorize the use of ratepayer funds for energy efficiency projects that help an agricultural or industrial customer meet industry standard practices. It is unclear what would constitute industry standard practice for highly customized agricultural and industrial projects. This provision could create a presumption of approval for replacement of significantly outdated technology that should have been addressed with funds that do not come from ratepayers.
The NMEC language in this bill is similar to language contained in SB 370 (Hertzberg, 2017), which passed this committee last year with amendments to conform the methodology for applying NMEC to the one established by AB 802.
Models for industrial and agricultural efficiency programs. Other methodologies exist for estimating savings from efficiency measures in industrial and agricultural buildings, including strategic energy management models. These models evaluate existing energy management business practices and identify opportunities to optimize energy use at industrial and manufacturing companies. The CPUC authorized strategic energy management programs for industrial customers through a 2016 order on energy efficiency programs (D.16-08-019). The decision allows the use of metered consumption data to calculate savings from behavioral, retrocommissioning, and operational efficiency activities. IOUs started implementing industrial strategic energy management programs in the first quarter of 2018. These programs offer a comprehensive approach through a long-term engagement with industrial customers, including training in energy management, audits, and technical and other assistance.
Need for amendments. According to the author’s office, this bill is intended to clarify the process by which agricultural and industrial customers can obtain IOU incentives for energy efficiency measures. As currently drafted, this bill would also require the CPUC to base authorization of IOU incentives on calculations of energy savings using NMEC. Prescribing NMEC as a methodology for calculating energy savings from highly customized projects is not necessary to achieve this bill’s goal of clarifying the CPUC’s processes and timelines. Additionally, prescribing NMEC for highly customized industrial and agricultural efficiency projects may not support effective ratepayer fund use. To the extent that the author and committee wish to focus this bill on clarifying the CPUC’s processes and timelines for reviewing agricultural and industrial efficiency projects, the author and committee may wish to limit the extent to which this bill prescribes a new NMEC methodology without enabling the CPUC to limit the use of ratepayer funds to replace outdated technology.
Prior/Related Legislation
SB 370 (Hertzberg, 2017) would have required the CPUC to authorize IOU incentives for industrial and agricultural energy efficiency projects based on NMEC. The bill would also have established requirements and timelines for the CPUC review of projects’ eligibility for incentives. The bill passed this committee on a vote of 10-0, then was held in the Senate Committee on Appropriations and subsequently amended into legislation to address solar storms.
AB 802 (Williams, Chapter 590, Statutes of 2015) required the CPUC to authorize IOU incentives and assistance for building energy efficiency measures that support the CEC’s energy efficiency standards for existing buildings and to allow IOUs to recover reasonable costs of those incentives and assistance through rates.
SB 350 (De León, Chapter 547, Statutes of 2015) the Clean Energy and Pollution Reduction Act of 2015, established new clean energy, clean air and GHG reduction goals. Specifically, the bill established a goal to double energy efficiency in existing buildings by 2030 and directs the CPUC to authorize energy efficiency program to meet the goal.
AB 758 (Skinner, Chapter 470, Statutes 2009) required the CEC to work with the CPUC and stakeholders to develop a comprehensive program to achieve greater energy efficiency in existing buildings.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT:
California Efficiency and Demand Management Council (Source)
Advanced Energy Economy
California Farm Bureau Federation
California Large Energy Consumers Association
California League of Food Producers
California Manufacturers & Technology Association
California State Association of Electrical Workers
California State Pip Trades Council
CleanPower Campaign
Coalition of California Utility Employees
International Union of Elevator Constructors
National Association of Energy Service Companies
Natural Resources Defense Council
Silicon Valley Leadership Group
Western States Council of Sheet Metal Workers
OPPOSITION:
None received
ARGUMENTS IN SUPPORT: According to the author:
“With varying industrial businesses and agricultural productions in California, it is not as explicit in the outset of a project under AB 802, what it means to have achieved energy efficiency. The lack of transparency from CPUC through this project analysis discourages applicants and leaves significant energy savings stranded.
Achieving our state’s pioneering energy goals necessitates that we include all users. This includes the industrial facilities and agricultural equipment where we can capture the most energy savings and lead to reduced greenhouse gas emissions.”
-- END --
Discussed in Hearing
Assembly Floor
Assembly Standing Committee on Appropriations
Assembly Standing Committee on Utilities and Energy
Senate Floor
Senate Standing Committee on Energy, Utilities and Communications
Bill Author
Bill Co-Author(s):