Under existing law, the State Water Resources Control Board administers a water rights program pursuant to which the board grants permits and licenses to appropriate water. Existing law requires an application for a permit to appropriate water to include, among other things, sufficient information to demonstrate a reasonable likelihood that unappropriated water is available for the proposed appropriation. Existing law requires the board to issue and deliver a notice of an application as soon as practicable after the receipt of an application for a permit to appropriate water that conforms to the law. Existing law allows interested persons to file a written protest with regard to an application to appropriate water and requires the protestant to set forth the objections to the application. Existing law declares that no hearing is necessary to issue a permit in connection with an unprotested application, or if the undisputed facts support the issuance of the permit and there is no disputed issue of material fact, unless the board elects to hold a hearing. Existing law prohibits the taking or possession of a fully protected fish, except as provided, and designates the unarmored threespine stickleback as a fully protected fish.
This bill, if the board has not rendered a final determination on an application for a permit to appropriate water within 25 years from the date the application was filed, would require the board to issue a notice and provide an opportunity for protests before rendering a final determination, with specified exceptions. This bill would provide that it is not a limitation on the authority of the board to issue a notice or direct the applicant to issue a notice if, because of changes in the project or other circumstances, the issuance of a notice is necessary to provide a fair opportunity for interested persons to file protests or is in the public interest.This bill would prohibit the board from issuing on or after January 1, 2018, a new permit to appropriate water from any river or stream that has, or is reasonably expected to have, a population of unarmored threespine stickleback.
Under existing law, the State Water Resources Control Board administers a water rights program pursuant to which the board grants permits and licenses to appropriate water. Existing law requires an application for a permit to appropriate water to include, among other things, sufficient information to demonstrate a reasonable likelihood that unappropriated water is available for the proposed appropriation. Existing law requires the board to issue and deliver a notice of an application as soon as practicable after the receipt of an application for a permit to appropriate water that conforms to the law. Existing law allows interested persons to file a written protest with regard to an application to appropriate water and requires the protestant to set forth the objections to the application. Existing law declares that no hearing is necessary to issue a permit in connection with an unprotested application, or if the undisputed facts support the issuance of the permit and there is no disputed issue of material fact, unless the board elects to hold a hearing.
This bill, if the board has not rendered a final determination on an application for a permit to appropriate water within 25 years from the date the application was filed, would require the board to issue a notice and provide an opportunity for protests before rendering a final determination, with specified exceptions. This bill would provide that it is not a limitation on the authority of the board to issue a notice or direct the applicant to issue a notice if, because of changes in the project or other circumstances, the issuance of a notice is necessary to provide a fair opportunity for interested persons to file protests or is in the public interest.
(1)Under existing law, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation regulates the drilling, operation, maintenance, and abandonment of oil and gas wells in the state. Existing law requires the State Oil and Gas Supervisor to continue the prohibition against Southern California Gas Company injecting any natural gas into the Aliso Canyon natural gas storage facility located in the County of Los Angeles until a comprehensive review of the safety of the gas storage wells at the facility is completed, as specified, the supervisor determines that well integrity has been ensured by the review, the risks of failures identified in the review have been addressed, the supervisors duty to prevent damage to life, health, property, and natural resources, and other requirements is satisfied, and the Executive Director of the Public Utilities Commission has concurred via letter with the supervisor regarding his or her determination of safety.This bill would additionally require the supervisor to continue that prohibition until a specified root cause analysis of the natural gas leak from the facility that started approximately October 23, 2015, has been completed and released in its entirety to the public.(2)Under existing law, the Public Utilities Commission is authorized to supervise and regulate every public utility in the state. Existing law requires the commission, no later than July 1, 2017, to open a proceeding to determine the feasibility of minimizing or eliminating use of the Aliso Canyon natural gas storage facility located in the County of Los Angeles while still maintaining energy and electric reliability for the region, and to consult with specified entities in making its determination.This bill would require that proceeding to be completed by December 31, 2017.(3)This bill would declare that it is to take effect immediately as an urgency statute.(1)Under existing law, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation regulates the drilling, operation, maintenance, and abandonment of oil and gas wells in the state. Existing law requires the State Oil and Gas Supervisor to continue the prohibition against Southern California Gas Company injecting any natural gas into the Aliso Canyon natural gas storage facility located in the County of Los Angeles until a comprehensive review of the safety of the gas storage wells at the facility is completed, as specified, the supervisor determines that well integrity has been ensured by the review, the risks of failures identified in the review have been addressed, the supervisors duty to prevent damage to life, health, property, and natural resources, and other requirements is satisfied, and the Executive Director of the Public Utilities Commission has concurred via letter with the supervisor regarding his or her determination of safety.
This bill would additionally require the supervisor to continue that prohibition until a specified root cause analysis of the natural gas leak from the facility that started approximately October 23, 2015, has been completed and released in its entirety to the public.
(2)Under existing law, the Public Utilities Commission is authorized to supervise and regulate every public utility in the state. Existing law requires the commission, no later than July 1, 2017, to open a proceeding to determine the feasibility of minimizing or eliminating use of the Aliso Canyon natural gas storage facility located in the County of Los Angeles while still maintaining energy and electric reliability for the region, and to consult with specified entities in making its determination.
This bill would require that proceeding to be completed by December 31, 2017.
(3)This bill would declare that it is to take effect immediately as an urgency statute.
The Legislature finds and declares the following:
(a)The take of unarmored threespine stickleback is prohibited under Section 5515 of the Fish and Game Code, except under a few specific and limited exemptions.
(b)It is important to ensure that there is no incidental or other prohibited take of unarmored threespine stickleback associated with the diversion or appropriation of water.
SEC. 2.Section 1257.7 is added to the Water Code, to read:1257.7.The board shall not issue, on or after January 1, 2018, a new permit to appropriate water from any river or stream that has, or is reasonably expected to have, a population of unarmored threespine stickleback (Gasterosteus aculeatus williamsoni).
SECTION 1.Section 1305 is added to the Water Code, to read:1305.(a)If the board has not rendered a final determination on an application for a permit to appropriate water within 25 years from the date the application was filed, the board shall issue a new notice and provide an opportunity for protests under Chapter 4 (commencing with Section 1330) before rendering a final determination.(b)A notice and opportunity for protests pursuant to subdivision (a) is not required if any of the following apply:(1)The application is canceled or denied.(2)A notice and opportunity for protests has been provided within five years prior to the board rendering a final approval.(3)The board holds a hearing or conducts proceedings under Article 1.5 (commencing with Section 1345), after public notice of the hearing or proceeding, and allows any person requesting notice of the hearing or proceedings to participate as a party in the hearing or proceeding, including the presentation of evidence, without having to have filed protests. The board shall provide not less than 45 days written notice, in the same manner as would be provided to an unresolved protestant, to any person requesting the notice.(4)The applicant is a public entity.(c)This section is not a limitation on the authority of the board to issue a notice or direct the applicant to issue a notice if, because of changes in the project or other circumstances, the issuance of a notice is necessary to provide a fair opportunity for interested persons to file protests or is in the public interest.(a)If the board has not rendered a final determination on an application for a permit to appropriate water within 25 years from the date the application was filed, the board shall issue a new notice and provide an opportunity for protests under Chapter 4 (commencing with Section 1330) before rendering a final determination.
(b)A notice and opportunity for protests pursuant to subdivision (a) is not required if any of the following apply:
(1)The application is canceled or denied.
(2)A notice and opportunity for protests has been provided within five years prior to the board rendering a final approval.
(3)The board holds a hearing or conducts proceedings under Article 1.5 (commencing with Section 1345), after public notice of the hearing or proceeding, and allows any person requesting notice of the hearing or proceedings to participate as a party in the hearing or proceeding, including the presentation of evidence, without having to have filed protests. The board shall provide not less than 45 days written notice, in the same manner as would be provided to an unresolved protestant, to any person requesting the notice.
(4)The applicant is a public entity.
(c)This section is not a limitation on the authority of the board to issue a notice or direct the applicant to issue a notice if, because of changes in the project or other circumstances, the issuance of a notice is necessary to provide a fair opportunity for interested persons to file protests or is in the public interest.
SECTION 1.Section 3217 of the Public Resources Code is amended to read:3217.(a)(1)The supervisor shall continue the prohibition against Southern California Gas Company injecting any natural gas into the Aliso Canyon natural gas storage facility located in the County of Los Angeles until a comprehensive review of the safety of the gas storage wells at the facility is completed and the supervisor determines that well integrity has been ensured by the review, the risks of failures identified in the review have been addressed, the Safety and Enforcement Division of the Public Utilities Commission-ordered third party root cause analysis of the natural gas leak from the facility that started approximately October 23, 2015, has been completed and released in its entirety to the public, and the supervisors duty to prevent damage to life, health, property, and natural resources, and other requirements, as specified in Section 3106, is satisfied. The supervisor may not lift the prohibition on injection until the Executive Director of the Public Utilities Commission has concurred via letter with the supervisor regarding his or her determination of safety.(2)For purposes of this section, facility means the Aliso Canyon natural gas storage facility located in the County of Los Angeles operated by Southern California Gas Company.(b)(1)The criteria for the gas storage well comprehensive safety review shall be determined by the supervisor with input from contracted independent experts and shall include the steps in subdivision (c).(2)The supervisor shall direct the contracted independent experts to provide a methodology to be used in assessing the tests and inspections specified in the criteria. This requirement may be satisfied by the independent experts reviewing and, if necessary, revising the divisions written methodology for assessing the tests and inspections specified in the criteria. The methodology shall include all tests and inspections required by the criteria. The division shall post the methodology online on a public portion of its Internet Web site.(c)The gas storage well comprehensive safety review shall include the following steps to ensure external and internal well mechanical integrity:(1)All gas storage wells shall be tested and inspected from the surface to the packer or to any wellbore restriction near the top of the geologic formation being used for gas storage, whichever is higher in elevation, to detect existing leaks using temperature and noise logs.(2)Any leaks shall be stopped and remediated to the satisfaction of the supervisor.(3)Following remediation, leak detection tests shall be repeated and results reviewed by the supervisor.(4)(A)Unless a well has been fully plugged and abandoned to the supervisors satisfaction and in accordance with Section 3208, the well shall be evaluated and remediated in accordance with subparagraph (B) or plugged in accordance with subparagraph (C).(B)If a gas storage well is intended to return to service for the purposes of resuming injections to the facility, it shall be tested and inspected from the surface to the packer or to any wellbore restriction near the top of the geologic formation being used for gas storage, whichever is higher in elevation, to ensure mechanical integrity. As identified in the divisions criteria, these tests and inspections shall include the measurement of casing thickness and integrity, an evaluation of the cement bond on the casing, the determination as to whether any deformities in the well casing exist, and an evaluation of the wells ability to withstand pressures that exceed maximum allowable injection and production pressures, with a reasonable margin for safety, at the facility in accordance with the criteria determined by the supervisor with input from independent experts pursuant to subdivision (b). If the tests reveal that a well poses a risk of failure, the supervisor shall require remediation and repeat tests as necessary to demonstrate to the satisfaction of the supervisor that remediation has mitigated any potential identified risks. If the operator cannot remediate the well to mitigate the identified risks to the satisfaction of the supervisor, the well shall be plugged and abandoned in accordance with Section 3208.(C)(i)If a well is to be taken out of service before resumption of gas injections at the facility, it shall be removed from operation and isolated from the gas storage reservoir through plugging according to the divisions criteria, including, but not limited to, the demonstration of sufficient cement to prevent migrations between the reservoir and other zones, placement of a mechanical plug at the bottom of the well, and subsequent filling of the well with fluid, and to specifications approved by the supervisor. All gas storage wells that are taken out of service under this subparagraph shall be subjected to ongoing testing and monitoring requirements identified in the criteria determined by the supervisor with input from independent experts. The monitoring shall include, but not be limited to, real-time and daily pressure monitoring, as applicable. A gas storage well shall not be returned to service unless the testing and remediation required under subparagraph (B) has been completed.(ii)A gas storage well, within one year of being plugged and isolated from the gas storage reservoir pursuant to clause (i), shall either be returned to service by satisfactorily completing the testing and remediation required under subparagraph (B) or be permanently plugged and abandoned to the supervisors satisfaction in accordance with Section 3208.(D)The supervisor shall make a written finding for each gas storage well that has satisfactorily completed the testing and remediation required under subparagraph (B).(5)The gas storage well comprehensive safety review is not complete until every gas storage well at the facility has completed the testing and remediation required under subparagraph (B) of paragraph (4), been temporarily abandoned and isolated from the reservoir as required under clause (i) of subparagraph (C) of paragraph (4), or been fully plugged and abandoned to the supervisors satisfaction in accordance with Section 3208.(d)Upon completion of the gas storage well comprehensive safety review but before authorizing the commencement of injections at the facility, the division shall hold at least one duly noticed public meeting in the affected community to provide the public an opportunity to comment on the safety review findings and on the proposed pressure limit as provided in subdivision (e).(e)(1)Before commencing injections at the facility, the operator of the facility shall provide the division with the proposed maximum reservoir pressure and include data and calculations supporting the basis for the pressure limit. The pressure limit shall account for the pressure required to inject intended gas volumes at all proposed inventory levels and the pressure limit shall not exceed the design pressure limits of the reservoir, wells, wellheads, piping, or associated facilities with an appropriate margin for safety.(2)The operators proposed maximum reservoir pressure shall be subject to review and approval by the supervisor, and the supervisor shall consult with independent experts regarding the appropriate maximum and minimum reservoir pressure at the facility.(f)Once the gas storage well comprehensive safety review is complete pursuant to paragraph (5) of subdivision (c), the supervisor has approved the maximum and minimum reservoir pressure pursuant to paragraph (2) of subdivision (e), and the public hearing is held pursuant to subdivision (d), the supervisor may allow injections of natural gas at the facility.(g)All gas storage wells returning to service pursuant to subdivision (f) shall only inject or produce gas through the interior metal tubing and not through the annulus between the tubing and the well casing. The operator shall also conduct ongoing pressure monitoring and comply with any other requirements specified by the supervisor.(h)The gas storage wells at the facility that are plugged and abandoned in accordance with Section 3208 pursuant to this section shall be periodically inspected by the operator for leaks using effective gas leak detection techniques such as optical gas imaging.(i)(1)Before the completion of the gas storage well comprehensive safety review, production of natural gas from gas storage wells at the facility shall be limited to gas storage wells that have satisfactorily completed the testing and remediation required under subparagraph (B) of paragraph (4) of subdivision (c) unless insufficient production capacity is available. Only if production capacity supplied by the tested and remediated wells is demonstrably insufficient may the supervisor allow other gas storage wells to be used.(2)The supervisor shall direct the operator of the facility to provide a plan to ensure, at the earliest possible time, the availability of sufficient gas production capacity using gas storage wells that have satisfactorily completed the testing and remediation required under subparagraph (B) of paragraph (4) of subdivision (c).(j)With respect to the gas storage well comprehensive safety review at the facility, all testing, inspection and monitoring results reported to the division, gas storage well compliance status, any required remediation steps, and other safety review-related materials shall be posted in a timely manner by the division online on a public portion of its Internet Web site.(k)This section shall remain in effect only until January 1, 2021, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2021, deletes or extends that date.SEC. 2.Section 714 of the Public Utilities Code is amended to read:714.(a)The commission, no later than July 1, 2017, shall open a proceeding to determine the feasibility of minimizing or eliminating use of the Aliso Canyon natural gas storage facility located in the County of Los Angeles while still maintaining energy and electric reliability for the region. This determination shall be consistent with the Clean Energy and Pollution Reduction Act of 2015 (Ch. 547, Stats. 2015) and Executive Order B-30-2015. The commission shall consult with the State Energy Resources Conservation and Development Commission, the Independent System Operator, the local publicly owned utilities that rely on natural gas for electricity generation, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation, affected balancing authorities, and other relevant government entities, in making its determination.(b)The proceeding opened pursuant to subdivision (a) shall be completed by December 31, 2017.(c)This section shall remain in effect only until January 1, 2021, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2021, deletes or extends that date.SEC. 3.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:In order to mitigate, at the earliest possible time, harm from the gas leak at the Aliso Canyon natural gas storage facility, and to thoroughly evaluate the integrity of and the risks associated with gas storage wells at that facility, it is necessary that this act take effect immediately.(a)(1)The supervisor shall continue the prohibition against Southern California Gas Company injecting any natural gas into the Aliso Canyon natural gas storage facility located in the County of Los Angeles until a comprehensive review of the safety of the gas storage wells at the facility is completed and the supervisor determines that well integrity has been ensured by the review, the risks of failures identified in the review have been addressed, the Safety and Enforcement Division of the Public Utilities Commission-ordered third party root cause analysis of the natural gas leak from the facility that started approximately October 23, 2015, has been completed and released in its entirety to the public, and the supervisors duty to prevent damage to life, health, property, and natural resources, and other requirements, as specified in Section 3106, is satisfied. The supervisor may not lift the prohibition on injection until the Executive Director of the Public Utilities Commission has concurred via letter with the supervisor regarding his or her determination of safety.
(2)For purposes of this section, facility means the Aliso Canyon natural gas storage facility located in the County of Los Angeles operated by Southern California Gas Company.
(b)(1)The criteria for the gas storage well comprehensive safety review shall be determined by the supervisor with input from contracted independent experts and shall include the steps in subdivision (c).
(2)The supervisor shall direct the contracted independent experts to provide a methodology to be used in assessing the tests and inspections specified in the criteria. This requirement may be satisfied by the independent experts reviewing and, if necessary, revising the divisions written methodology for assessing the tests and inspections specified in the criteria. The methodology shall include all tests and inspections required by the criteria. The division shall post the methodology online on a public portion of its Internet Web site.
(c)The gas storage well comprehensive safety review shall include the following steps to ensure external and internal well mechanical integrity:
(1)All gas storage wells shall be tested and inspected from the surface to the packer or to any wellbore restriction near the top of the geologic formation being used for gas storage, whichever is higher in elevation, to detect existing leaks using temperature and noise logs.
(2)Any leaks shall be stopped and remediated to the satisfaction of the supervisor.
(3)Following remediation, leak detection tests shall be repeated and results reviewed by the supervisor.
(4)(A)Unless a well has been fully plugged and abandoned to the supervisors satisfaction and in accordance with Section 3208, the well shall be evaluated and remediated in accordance with subparagraph (B) or plugged in accordance with subparagraph (C).
(B)If a gas storage well is intended to return to service for the purposes of resuming injections to the facility, it shall be tested and inspected from the surface to the packer or to any wellbore restriction near the top of the geologic formation being used for gas storage, whichever is higher in elevation, to ensure mechanical integrity. As identified in the divisions criteria, these tests and inspections shall include the measurement of casing thickness and integrity, an evaluation of the cement bond on the casing, the determination as to whether any deformities in the well casing exist, and an evaluation of the wells ability to withstand pressures that exceed maximum allowable injection and production pressures, with a reasonable margin for safety, at the facility in accordance with the criteria determined by the supervisor with input from independent experts pursuant to subdivision (b). If the tests reveal that a well poses a risk of failure, the supervisor shall require remediation and repeat tests as necessary to demonstrate to the satisfaction of the supervisor that remediation has mitigated any potential identified risks. If the operator cannot remediate the well to mitigate the identified risks to the satisfaction of the supervisor, the well shall be plugged and abandoned in accordance with Section 3208.
(C)(i)If a well is to be taken out of service before resumption of gas injections at the facility, it shall be removed from operation and isolated from the gas storage reservoir through plugging according to the divisions criteria, including, but not limited to, the demonstration of sufficient cement to prevent migrations between the reservoir and other zones, placement of a mechanical plug at the bottom of the well, and subsequent filling of the well with fluid, and to specifications approved by the supervisor. All gas storage wells that are taken out of service under this subparagraph shall be subjected to ongoing testing and monitoring requirements identified in the criteria determined by the supervisor with input from independent experts. The monitoring shall include, but not be limited to, real-time and daily pressure monitoring, as applicable. A gas storage well shall not be returned to service unless the testing and remediation required under subparagraph (B) has been completed.
(ii)A gas storage well, within one year of being plugged and isolated from the gas storage reservoir pursuant to clause (i), shall either be returned to service by satisfactorily completing the testing and remediation required under subparagraph (B) or be permanently plugged and abandoned to the supervisors satisfaction in accordance with Section 3208.
(D)The supervisor shall make a written finding for each gas storage well that has satisfactorily completed the testing and remediation required under subparagraph (B).
(5)The gas storage well comprehensive safety review is not complete until every gas storage well at the facility has completed the testing and remediation required under subparagraph (B) of paragraph (4), been temporarily abandoned and isolated from the reservoir as required under clause (i) of subparagraph (C) of paragraph (4), or been fully plugged and abandoned to the supervisors satisfaction in accordance with Section 3208.
(d)Upon completion of the gas storage well comprehensive safety review but before authorizing the commencement of injections at the facility, the division shall hold at least one duly noticed public meeting in the affected community to provide the public an opportunity to comment on the safety review findings and on the proposed pressure limit as provided in subdivision (e).
(e)(1)Before commencing injections at the facility, the operator of the facility shall provide the division with the proposed maximum reservoir pressure and include data and calculations supporting the basis for the pressure limit. The pressure limit shall account for the pressure required to inject intended gas volumes at all proposed inventory levels and the pressure limit shall not exceed the design pressure limits of the reservoir, wells, wellheads, piping, or associated facilities with an appropriate margin for safety.
(2)The operators proposed maximum reservoir pressure shall be subject to review and approval by the supervisor, and the supervisor shall consult with independent experts regarding the appropriate maximum and minimum reservoir pressure at the facility.
(f)Once the gas storage well comprehensive safety review is complete pursuant to paragraph (5) of subdivision (c), the supervisor has approved the maximum and minimum reservoir pressure pursuant to paragraph (2) of subdivision (e), and the public hearing is held pursuant to subdivision (d), the supervisor may allow injections of natural gas at the facility.
(g)All gas storage wells returning to service pursuant to subdivision (f) shall only inject or produce gas through the interior metal tubing and not through the annulus between the tubing and the well casing. The operator shall also conduct ongoing pressure monitoring and comply with any other requirements specified by the supervisor.
(h)The gas storage wells at the facility that are plugged and abandoned in accordance with Section 3208 pursuant to this section shall be periodically inspected by the operator for leaks using effective gas leak detection techniques such as optical gas imaging.
(i)(1)Before the completion of the gas storage well comprehensive safety review, production of natural gas from gas storage wells at the facility shall be limited to gas storage wells that have satisfactorily completed the testing and remediation required under subparagraph (B) of paragraph (4) of subdivision (c) unless insufficient production capacity is available. Only if production capacity supplied by the tested and remediated wells is demonstrably insufficient may the supervisor allow other gas storage wells to be used.
(2)The supervisor shall direct the operator of the facility to provide a plan to ensure, at the earliest possible time, the availability of sufficient gas production capacity using gas storage wells that have satisfactorily completed the testing and remediation required under subparagraph (B) of paragraph (4) of subdivision (c).
(j)With respect to the gas storage well comprehensive safety review at the facility, all testing, inspection and monitoring results reported to the division, gas storage well compliance status, any required remediation steps, and other safety review-related materials shall be posted in a timely manner by the division online on a public portion of its Internet Web site.
(k)This section shall remain in effect only until January 1, 2021, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2021, deletes or extends that date.
SEC. 2.Section 714 of the Public Utilities Code is amended to read:714.(a)The commission, no later than July 1, 2017, shall open a proceeding to determine the feasibility of minimizing or eliminating use of the Aliso Canyon natural gas storage facility located in the County of Los Angeles while still maintaining energy and electric reliability for the region. This determination shall be consistent with the Clean Energy and Pollution Reduction Act of 2015 (Ch. 547, Stats. 2015) and Executive Order B-30-2015. The commission shall consult with the State Energy Resources Conservation and Development Commission, the Independent System Operator, the local publicly owned utilities that rely on natural gas for electricity generation, the Division of Oil, Gas, and Geothermal Resources in the Department of Conservation, affected balancing authorities, and other relevant government entities, in making its determination.
(b)The proceeding opened pursuant to subdivision (a) shall be completed by December 31, 2017.
(b)(c)This section shall remain in effect only until January 1, 2021, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2021, deletes or extends that date.
SEC. 3.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to mitigate, at the earliest possible time, harm from the gas leak at the Aliso Canyon natural gas storage facility, and to thoroughly evaluate the integrity of and the risks associated with gas storage wells at that facility, it is necessary that this act take effect immediately.
|
Date
|
Status
|
|---|---|
| Feb 1, 2018 | Returned to Secretary of Senate pursuant to Joint Rule 56. |
| Apr 24, 2017 | April 25 hearing postponed by committee. |
| Apr 7, 2017 | Set for hearing April 25. |
| Mar 27, 2017 | March 28 set for second hearing canceled at the request of author. |
| Mar 21, 2017 | Set for hearing March 28. |
| Mar 20, 2017 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on N.R. & W. |
| Mar 7, 2017 | Set for hearing March 28. |
| Mar 3, 2017 | March 14 set for first hearing canceled at the request of author. |
| Feb 18, 2017 | Set for hearing March 14. |
| Feb 17, 2017 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on N.R. & W. |
| Jan 26, 2017 | Referred to Coms. on N.R. & W. and E., U. & C. |
| Jan 18, 2017 | From printer. May be acted upon on or after February 17. |
| Jan 17, 2017 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
SENATE COMMITTEE ON NATURAL RESOURCES AND WATER
Senator Robert Hertzberg, Chair
2017 - 2018 Regular
Bill No: SB 146 Hearing Date: March 28, 2017
Author: | |||
Version: |
| ||
Urgency: | Fiscal: | ||
Consultant: | |||
Subject: Water resources: permit to appropriate: protected species.
BACKGROUND AND EXISTING LAW
- Existing law prohibits the taking or possession of a species listed as a fully protected fish except as specified. Among the fish species that are classified as fully is the unarmored threespine stickleback (Gasterosteus aculeatus williamsoni) (UTS).
- According to the U.S. Fish and Wildlife Service:
“The UTS is currently restricted to three areas: the upper Santa Clara River and its tributaries in Los Angeles County, San Antonio Creek on Vandenberg Air Force Base in Santa Barbara County, and the Shay Creek vicinity (which includes Shay Pond, Sugarloaf Pond, Juniper Springs, Motorcycle Pond, Shay Creek, Wiebe Pond, and Baldwin Lake), in San Bernardino County. San Felipe Creek in San Diego County is another area that may support the UTS; however, its current status is unknown.”
(U.S. Fish and Wildlife Service, Unarmored Threespine Stickleback 5-Year Review: Summary and Evaluation, May 29, 2009)
- Existing law also provides a process for applying for a permit to appropriate water. The process is initiated when an Application to Appropriate Water by Permit is filed with the State Water Resources Control Board (SWRCB) by the person or other entity desiring to divert water. This application specifically describes the proposed project's source, place of use, purpose, point(s) of diversion and quantity to be diverted.
- To be accepted for initial review, an application must include the filing fee, and be a bona fide attempt to conform to the rules of the SWRCB and the law. Acceptance establishes priority as the date the application was received by the SWRCB.
- The applicant must comply with the California Environmental Quality Act before a permit can be issued. Large projects that could endanger or degrade natural habitat or water quality usually require preparation of an Environmental Impact Report. The SWRCB, in its role as either Lead Agency or Responsible Agency, examines the proposed project's potential environmental impacts and determines whether mitigation measures will be needed. The SWRCB must also consider the effect of the proposed project on public trust resources such as fisheries, navigation, recreation, and ecology.
- Before granting a permit, the SWRCB must find that there is unappropriated water available to supply the applicant. The analysis is typically performed by an engineering consultant retained by the applicant. Occasionally, the applicant or SWRCB staff may perform the analysis.
- Projects located in certain geographic areas must comply with applicable SWRCB policies relevant to processing a water right application. For example, the Policy for Maintaining Instream Flows in Northern California Coastal Streams applies to projects located in Marin, Sonoma, and portions of Napa, Mendocino, and Humboldt Counties.
- The SWRCB is required by law to publish a notice of the application. Any person may file a protest to the application. It is the responsibility of the applicant and any protestant(s) to make a good faith effort to resolve the protest(s). If both parties can agree to mutually acceptable conditions, the protest is resolved. If a protest is not resolved for a small project, a field investigation will be conducted by the Division of Water Rights. The Division may grant or deny a protested application for a small project based on the field investigation, or the Division may hold a hearing. For large projects with unresolved protests, a hearing is held before one or more members of the SWRCB. The SWRCB's decision is based upon the record established during the hearing.
- Two initial SWRCB findings are required before a permit can be issued: (1) unappropriated water is available to supply the applicant, and (2) the applicant's appropriation is in the public interest, a concept that is an overriding concern in all SWRCB decisions. If the proposed appropriation does not meet these criteria, conditions may be imposed to ensure they are satisfied or the application may be denied. A permit may only allow diversion and use of that amount of water that the applicant has demonstrated is necessary for the proposed purpose for as long a time as the project is deemed reasonable and is diligently pursued.
Currently, the water rights permitting process is estimated to require five to seven years for regular priority projects from the time an application is received to the time that a decision is rendered. However, it takes some applicants much longer to comply with all the permit requirements. Currently over 40 applications have been pending for 25 years or more.
PROPOSED LAW
This bill would:
- Find:
- The take of unarmored threespine stickleback is prohibited under Section 5515 of the Fish and Game Code, except under a few specific and limited exemptions.
- It is important to ensure that there is no incidental or other prohibited take of unarmored threespine stickleback associated with the diversion or appropriation of water.
- Prohibit the SWRCB, on or after January 1, 2018, from issuing a new permit to appropriate water from any river or stream that has, or is reasonably expected to have, a population of unarmored threespine stickleback.
ARGUMENTS IN SUPPORT
According to the author, “The Santa Clara River in Soledad Canyon, near the City of Santa Clarita, serves as the primary remaining habitat for the Unarmored Threespine Stickleback (UTS), a fish on the California Fully Protected Species List and the federal Endangered Species List. “
“This stretch of river presents a unique habitat for the UTS because during summer months, particularly in drought years, a majority of this river runs dry. However, the Soledad Canyon area remains wet year round; creating a refuge for the UTS.”
“Area residents place a high value on preserving and protecting the UTS and this delicate ecosystem. To that effect, they have been entrenched in a decades long battle to protect this segment of the River against a proposed mining project that would bring one of the nation’s largest aggregate mines to Soledad Canyon and deplete water flow from the river where the UTS depend on the flow for survival. “
“The habitat created by the Santa Clara River in Soledad Canyon and the endangered species it supports, are put at great risk by this proposed mine and the UTS may well disappear with the massive water consumption proposed by the mine’s developer, CEMEX, Inc., which is awaiting an application to appropriate water to be ruled upon by the State Water Resources Control Board (SWRCB). By protecting this area we can preserve it as a hotbed for biological diversity now and in to the future and save this endangered species from extinction.”
ARGUMENTS IN OPPOSITION
According to CEMEX, Inc., “This measure is an attempt to single out and prevent CEMEX’s project in the guise of protecting the unarmored threespine stickleback (UTS), a species that is already fully protected under federal and state law. Thus, SB 146 is an unnecessary departure from longstanding and effective endangered species and water laws and policies. It appears that the true purpose of this bill – to deny CEMEX the right to operate its aggregate extraction project, which the California Department of Conservation has designated a Regionally Significant Construction Aggregate Resource, outside the City of Santa Clarita – is evident from Senator Wilk’s press releases and related news coverage. The measure also runs counter to the state’s efforts to reduce greenhouse gas emissions pursuant to AB 32 and SB 32 as it will result in aggregates having to be transported over longer distances.”
CEMEX also notes:
- The SWRCB has a comprehensive, transparent, and time consuming review and approval process that requires compliance with state and federal endangered species acts before it can issue a permit.
- In 1990, the Bureau of Land Management awarded CEMEX the right to mine the BLS’s Soledad Canyon site over a 20-year period following a competitive bidding process. The BLM complied with NEPA in approving the mine and County of Los Angeles complied with CEQA in issuing the mining permits. Both the BLS’s EIS and the County’s EIR were held up as valid in several court proceedings.
- The City of Santa Clarita has filed numerous legal challenges to fight the Soledad project, resulting in significant delays. Santa Clarita and CEMEX entered into a formal truce in 2007 to try to develop a mutually agreeable solution. The truce included an acknowledgement that time spent negotiation would not be characterized as a delay and would not be used by either party against the other. The truce ended in late 2012 and the City has since supported efforts to thwart CEMEX’s effort to commence operations at Soledad Canyon.
The Association of California Water Agencies, commenting on the previous version of this bill, raised concerns that the bill could have unforeseen potential to hinder the administration of water rights statewide.
COMMENTS
Who Would This Affect? A review of the SWRCB’s Electronic Water Rights Information Management System (eWRIMS) shows only two water rights applications would be affected by this bill, CEMEX, Inc. and another mining company CALMAT Co. who is also proposing a mine in the same general area.
Where Is CEMEX In The Water Rights Process? The application has been submitted (1991), accepted (1991), and publicly noticed (1991). Protest resolution is still in progress. Six protests remain outstanding, and the applicant is currently engaged in protest resolution efforts. The water availability analysis in in process, the draft water supply report is currently due 5/2017. Further analysis may be necessary depending on results of the water supply report. CEQA is still pending – the SWRCB does not file notice until they take action on the application.
How Would Potential Applicants Know Where UTS Are? Unfortunately, the U.S. Fish and Wildlife Service has no critical habitat determination nor map showing where the UTS are. Similarly, there are no State Department of Fish and Wildlife habitat designations for UTS. Consequently, it could be challenging for potential water rights applicants to know which rivers and streams are off limits.
Whole River or Certain Reaches Off-Limits? This bill places the entire river or stream off limits. However, UTS are typically found only along certain reaches of a river or stream. So, water diversions and other actions downstream would be unlikely to result in take of UTS.
What If A Potential Permitee Wants To Challenge The Presence Of UTS? The water rights management system in California generally provides ample opportunity to challenge or appeal decisions by the SWRCB. This bill doesn’t appear to provide such an opportunity.
This Bill Is A Work In Progress. Should the committee pass this bill, the author should be encouraged to work with committee staff to do the following:
- Develop a mechanism for identifying where UTS are or otherwise alerting potential water rights applicants which water bodies are closed for new permits
- Explore options for potential water rights applicants to divert downstream of UTS where appropriate
- Develop a mechanism for potential water rights applicants to demonstrate that the provisions of this bill don’t apply to their application.
Double-referral The Rules Committee referred this bill to both the Committee on Natural Resources and Water and to the Committee on Energy, Utilities, and Communications. Therefore, if this bill passes this committee, it will be referred to the Committee on Energy, Utilities, and Communications, which will consider the issues within their jurisdiction.
SUGGESTED AMENDMENTS: None
SUPPORT
Center for Biological Diversity
City of Santa Clarita
College of the Canyons
Friends of the Santa Clara River
KHTS AM 1220
Newhall County Water District
Safe Action For the Environment
San Fernando Valley Audubon Society
Santa Clarita Organization for Planning and the Environment
Santa Clarita Valley Economic Development Corporation
Sierra Club California
Ventura Coastkeeper Program
Wishtoyo Foundation
OPPOSITION
Association of California Water Agencies (ACWA)
CEMEX Inc.