AB 248: Hazardous waste: facilities: permits.
- Session Year: 2017-2018
- House: Assembly
- Latest Version Date: 2017-09-19
Existing law, as part of the hazardous waste control law, requires a facility handling hazardous waste to apply for and obtain a hazardous waste facilities permit from the Department of Toxic Substances Control. Existing law requires that a hazardous waste facilities permit be for a fixed term not to exceed 10 years for certain facilities. Existing law requires the owner or operator of a facility intending to extend the facilitys permit to submit a complete Part A application for a permit renewal before the fixed term of the permit expires, and, at any time following the submittal of the Part A application, to submit a complete Part B application, or any portion of that application, and other relevant information, if requested by the department. Existing law provides that when a complete Part A renewal application and any other requested information has been submitted before the end of the permits fixed term, the permit is deemed extended until the application is approved or denied and the owner has exhausted all applicable rights of appeal.
This bill would require, for a hazardous waste facilities permit that will expire on or before July 1, 2020, the owner or operator of a facility intending to extend the term of that permit to submit a Part A and Part B application for a permit renewal at least 6 months before the fixed term of the permit expires. The bill would require, for a hazardous waste facilities permit that will expire after July 1, 2020, the owner or operator to submit a Part A and Part B application for a permit renewal at least 2 years before the fixed term of the permit expires. The bill would provide that if a Part A and Part B renewal application and any other requested information has been submitted at least 6 months or at least 2 years, as applicable, before the end of the permits fixed term, the permit is deemed extended until the application is approved or denied and the owner has exhausted all applicable rights of appeal. The bill would also require the department, no later than 90 days after receiving an application for a hazardous waste facilities permit, to post on its Internet Web site a timeline with the estimated dates of key milestones in the application review process, to note on its Internet Web site that these dates are estimates, and to update the dates as needed.
Existing law, as part of the hazardous waste control law, requires a facility handling hazardous waste to apply for and obtain a hazardous waste facilities permit from the Department of Toxic Substances Control. Existing law requires that a hazardous waste facilities permit be for a fixed term not to exceed 10 years for certain facilities. Existing law requires the owner or operator of a facility intending to extend the facilitys permit to submit a complete Part A application for a permit renewal before the fixed term of the permit expires, and, at any time following the submittal of the Part A application, to submit a complete Part B application, or any portion of that application, and other relevant information, if requested by the department. Existing law provides that when a complete Part A renewal application and any other requested information has been submitted before the end of the permits fixed term, the permit is deemed extended until the application is approved or denied and the owner has exhausted all applicable rights of appeal.
This bill would require, for a hazardous waste facilities permit that will expire on or before July 1, 2020, the owner or operator of a facility intending to extend the term of that permit to submit a complete Part A and Part B application for a permit renewal at least 6 months before the fixed term of the permit expires. The bill would require, for a hazardous waste facilities permit that will expire after July 1, 2020, the owner or operator to submit a complete Part A and Part B application for a permit renewal at least 2 years before the fixed term of the permit expires. The bill would provide that when if a complete Part A and Part B renewal application and any other requested information has been submitted at least 6 months or at least 2 years, as applicable, before the end of the permits fixed term, the permit is deemed extended until the application is approved or denied and the owner has exhausted all applicable rights of appeal. The bill would also require the department, no later than 90 days after receiving a completed an application for a hazardous waste facilities permit, to post on its Internet Web site a timeline with the estimated dates of key milestones in the application review process, to note on its Internet Web site that these dates are estimates, and to update the dates as needed.
Existing law, as part of the hazardous waste control law, requires a facility handling hazardous waste to apply for and obtain a hazardous waste facilities permit from the Department of Toxic Substances Control. Existing law requires that a hazardous waste facilities permit be for a fixed term not to exceed 10 years for certain facilities. Existing law requires the owner or operator of a facility intending to extend the facilitys permit to submit a complete Part A application for a permit renewal before the fixed term of the permit expires, and, at any time following the submittal of the Part A application, to submit a complete Part B application, or any portion of that application, and other relevant information, if requested by the department. Existing law provides that when a complete Part A renewal application and any other requested information has been submitted before the end of the permits fixed term, the permit is deemed extended until the application is approved or denied and the owner has exhausted all applicable rights of appeal.
This bill would require, for a hazardous waste facilities permit that will expire on or before July 1, 2020, the owner or operator of a facility intending to extend the term of that permit to submit a complete Part A and Part B application for a permit renewal at least 6 months before the fixed term of the permit expires. The bill would require, for a hazardous waste facilities permit that will expire after July 1, 2020, the owner or operator to submit a complete Part A and Part B application for a permit renewal at least 2 years before the fixed term of the permit expires. The bill would provide that when a complete Part A and Part B renewal application and any other requested information has been submitted at least 6 months or at least 2 years, as applicable, before the end of the permits fixed term, the permit is deemed extended until the application is approved or denied and the owner has exhausted all applicable rights of appeal. The bill would also require the department, no later than 90 days after receiving a completed application for a hazardous waste facilities permit, to post on its Internet Web site a timeline with the estimated dates of key milestones in the application review process, to note on its Internet Web site that these dates are estimates, and to update the dates as needed.
(a)The department shall issue hazardous waste facilities permits to use and operate one or more hazardous waste management units at a facility that in the judgment of the department meet the building standards published in the State Building Standards Code relating to hazardous waste facilities and the other standards and requirements adopted pursuant to this chapter. The department shall impose conditions on each hazardous waste facilities permit specifying the types of hazardous wastes that may be accepted for transfer, storage, treatment, or disposal. The department may impose any other conditions on a hazardous waste facilities permit that are consistent with the intent of this chapter.
(b)The department may impose, as a condition of a hazardous waste facilities permit, a requirement that the owner or operator of a hazardous waste facility that receives hazardous waste from more than one producer comply with any order of the director that prohibits the facility operator from refusing to accept a hazardous waste based on geographical origin that is authorized to be accepted and may be accepted by the facility without extraordinary hazard.
(c)(1)(A)A hazardous waste facilities permit issued by the department shall be for a fixed term, which shall not exceed 10 years for any land disposal facility, storage facility, incinerator, or other treatment facility.
(B)An owner or operator of a facility who intends to extend the term of a hazardous waste facilities permit that expires on or before July 1, 2020, shall submit a Part A and Part B application for a permit renewal at least six months before the fixed term of the permit expires, in order for the department to begin its administrative review of the Part A and Part B application. To the extent not inconsistent with the federal act, if a Part A and Part B renewal application, and any other requested information, has been submitted under this subparagraph at least six months before the end of the permits fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.
(C)An owner or operator of a facility who intends to extend the term of a hazardous waste facilities permit that expires after July 1, 2020, shall submit a Part A and Part B application for a permit renewal at least two years before the fixed term of the permit expires, in order for the department to begin its administrative review of the Part A and Part B application. To the extent not inconsistent with the federal act, if a Part A and Part B renewal application, and any other requested information, has been submitted under this subparagraph at least two years before the end of the permits fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.
(D)This section does not limit or restrict the departments authority to impose any additional or different conditions on an extended permit that are necessary to protect human health and the environment.
(E)In adopting new conditions for an extended permit, the department shall follow the applicable permit modification procedures specified in this chapter and the regulations adopted pursuant to this chapter.
(F)When prioritizing pending renewal applications for processing and in determining the need for any new conditions on an extended permit, the department shall consider any input received from the public.
(2)The department shall review each hazardous waste facilities permit for a land disposal facility five years after the date of issuance or reissuance, and shall modify the permit, as necessary, to ensure that the facility continues to comply with the currently applicable requirements of this chapter and the regulations adopted pursuant to this chapter.
(3)This subdivision does not prohibit the department from reviewing, modifying, or revoking a permit at any time during its term.
(d)(1)When reviewing an application for a permit renewal, the department shall consider improvements in the state of control and measurement technology as well as changes in applicable regulations.
(2)Each permit issued or renewed under this section shall contain the terms and conditions that the department determines necessary to protect human health and the environment.
(e)A permit issued pursuant to the federal act by the Environmental Protection Agency in the state for which no state hazardous waste facilities permit has been issued shall be deemed to be a state permit enforceable by the department until a state permit is issued. In addition to complying with the terms and conditions specified in a federal permit deemed to be a state permit pursuant to this section, an owner or operator who holds that permit shall comply with the requirements of this chapter and the regulations adopted by the department to implement this chapter.
SEC. 2.Section 25200.05 is added to the Health and Safety Code, to read:25200.05.No later than 90 days after receiving an application for a hazardous waste facilities permit, the department shall post on its Internet Web site a timeline with the estimated dates of key milestones in the application review process, which shall include, but not be limited to, the dates of public meetings and the date for issuance of a draft decision. The department shall note on its Internet Web site that these dates are estimates and shall update the dates as needed.
(a)The department shall issue hazardous waste facilities permits to use and operate one or more hazardous waste management units at a facility that in the judgment of the department meet the building standards published in the State Building Standards Code relating to hazardous waste facilities and the other standards and requirements adopted pursuant to this chapter. The department shall impose conditions on each hazardous waste facilities permit specifying the types of hazardous wastes that may be accepted for transfer, storage, treatment, or disposal. The department may impose any other conditions on a hazardous waste facilities permit that are consistent with the intent of this chapter.
(b)The department may impose, as a condition of a hazardous waste facilities permit, a requirement that the owner or operator of a hazardous waste facility that receives hazardous waste from more than one producer comply with any order of the director that prohibits the facility operator from refusing to accept a hazardous waste based on geographical origin that is authorized to be accepted and may be accepted by the facility without extraordinary hazard.
(c)(1)(A)A hazardous waste facilities permit issued by the department shall be for a fixed term, which shall not exceed 10 years for any land disposal facility, storage facility, incinerator, or other treatment facility.
(B)An owner or operator of a facility who intends to extend the term of a hazardous waste facilities permit that expires on or before July 1, 2020, shall submit a complete Part A and Part B application for a permit renewal at least six months before the fixed term of the permit expires. expires, in order for the department to begin its administrative review of the Part A and Part B application. To the extent not inconsistent with the federal act, when if a complete Part A and Part B renewal application, and any other requested information, has been submitted under this subparagraph at least six months before the end of the permits fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.
(C)An owner or operator of a facility who intends to extend the term of a hazardous waste facilities permit that expires after July 1, 2020, shall submit a complete Part A and Part B application for a permit renewal at least two years before the fixed term of the permit expires. expires, in order for the department to begin its administrative review of the Part A and Part B application. To the extent not inconsistent with the federal act, when if a complete Part A and Part B renewal application, and any other requested information, has been submitted under this subparagraph at least two years before the end of the permits fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.
(D)This section does not limit or restrict the departments authority to impose any additional or different conditions on an extended permit that are necessary to protect human health and the environment.
(E)In adopting new conditions for an extended permit, the department shall follow the applicable permit modification procedures specified in this chapter and the regulations adopted pursuant to this chapter.
(F)When prioritizing pending renewal applications for processing and in determining the need for any new conditions on an extended permit, the department shall consider any input received from the public.
(2)The department shall review each hazardous waste facilities permit for a land disposal facility five years after the date of issuance or reissuance, and shall modify the permit, as necessary, to ensure that the facility continues to comply with the currently applicable requirements of this chapter and the regulations adopted pursuant to this chapter.
(3)This subdivision does not prohibit the department from reviewing, modifying, or revoking a permit at any time during its term.
(d)(1)When reviewing an application for a permit renewal, the department shall consider improvements in the state of control and measurement technology as well as changes in applicable regulations.
(2)Each permit issued or renewed under this section shall contain the terms and conditions that the department determines necessary to protect human health and the environment.
(e)A permit issued pursuant to the federal act by the Environmental Protection Agency in the state for which no state hazardous waste facilities permit has been issued shall be deemed to be a state permit enforceable by the department until a state permit is issued. In addition to complying with the terms and conditions specified in a federal permit deemed to be a state permit pursuant to this section, an owner or operator who holds that permit shall comply with the requirements of this chapter and the regulations adopted by the department to implement this chapter.
SEC. 2.Section 25200.05 is added to the Health and Safety Code, to read:25200.05.No later than 90 days after receiving a completed an application for a hazardous waste facilities permit, the department shall post on its Internet Web site a timeline with the estimated dates of key milestones in the application review process, which shall include, but not be limited to, the dates of public meetings and the date for issuance of a draft decision. The department shall note on its Internet Web site that these dates are estimates and shall update the dates as needed.
(a)The department shall issue hazardous waste facilities permits to use and operate one or more hazardous waste management units at a facility that in the judgment of the department meet the building standards published in the State Building Standards Code relating to hazardous waste facilities and the other standards and requirements adopted pursuant to this chapter. The department shall impose conditions on each hazardous waste facilities permit specifying the types of hazardous wastes that may be accepted for transfer, storage, treatment, or disposal. The department may impose any other conditions on a hazardous waste facilities permit that are consistent with the intent of this chapter.
(b)The department may impose, as a condition of a hazardous waste facilities permit, a requirement that the owner or operator of a hazardous waste facility that receives hazardous waste from more than one producer comply with any order of the director that prohibits the facility operator from refusing to accept a hazardous waste based on geographical origin that is authorized to be accepted and may be accepted by the facility without extraordinary hazard.
(c)(1)(A)Any A hazardous waste facilities permit issued by the department shall be for a fixed term, which shall not exceed 10 years for any land disposal facility, storage facility, incinerator, or other treatment facility.
(B)Before the fixed term of a permit expires, the An owner or operator of a facility intending who intends to extend the term of the facilitys a hazardous waste facilities permit that expires on or before July 1, 2020, shall submit a complete Part A and Part B application for a permit renewal. At any time following the submittal of the Part A application, the owner or operator of a facility shall submit a complete Part B application, or any portion thereof, as well as any other relevant information, as and when requested by the department. renewal at least six months before the fixed term of the permit expires. To the extent not inconsistent with the federal act, when a complete Part A and Part B renewal application, and any other requested information, has been submitted under this subparagraph at least six months before the end of the permits fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.
(C)An owner or operator of a facility who intends to extend the term of a hazardous waste facilities permit that expires after July 1, 2020, shall submit a complete Part A and Part B application for a permit renewal at least two years before the fixed term of the permit expires. To the extent not inconsistent with the federal act, when a complete Part A and Part B renewal application, and any other requested information, has been submitted under this subparagraph at least two years before the end of the permits fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.
(C)(D)This section does not limit or restrict the departments authority to impose any additional or different conditions on an extended permit that are necessary to protect human health and the environment.
(D)(E)In adopting new conditions for an extended permit, the department shall follow the applicable permit modification procedures specified in this chapter and the regulations adopted pursuant to this chapter.
(E)(F)When prioritizing pending renewal applications for processing and in determining the need for any new conditions on an extended permit, the department shall consider any input received from the public.
(2)The department shall review each hazardous waste facilities permit for a land disposal facility five years after the date of issuance or reissuance, and shall modify the permit, as necessary, to assure ensure that the facility continues to comply with the currently applicable requirements of this chapter and the regulations adopted pursuant to this chapter.
(3)This subdivision does not prohibit the department from reviewing, modifying, or revoking a permit at any time during its term.
(d)(1)When reviewing any an application for a permit renewal, the department shall consider improvements in the state of control and measurement technology as well as changes in applicable regulations.
(2)Each permit issued or renewed under this section shall contain the terms and conditions that the department determines necessary to protect human health and the environment.
(e)A permit issued pursuant to the federal act by the Environmental Protection Agency in the state for which no state hazardous waste facilities permit has been issued shall be deemed to be a state permit enforceable by the department until a state permit is issued. In addition to complying with the terms and conditions specified in a federal permit deemed to be a state permit pursuant to this section, an owner or operator who holds that permit shall comply with the requirements of this chapter and the regulations adopted by the department to implement this chapter.
SEC. 2.Section 25200.05 is added to the Health and Safety Code, to read:25200.05.No later than 90 days after receiving a completed application for a hazardous waste facilities permit, the department shall post on its Internet Web site a timeline with the estimated dates of key milestones in the application review process, which shall include, but not be limited to, the dates of public meetings and the date for issuance of a draft decision. The department shall note on its Internet Web site that these dates are estimates and shall update the dates as needed.
|
Date
|
Status
|
|---|---|
| Jan 12, 2018 | Stricken from file. |
| Jan 3, 2018 | Consideration of Governor's veto pending. |
| Oct 10, 2017 | Vetoed by Governor. |
| Sep 26, 2017 | Enrolled and presented to the Governor at 3 p.m. |
| Sep 16, 2017 | In Assembly. Ordered to Engrossing and Enrolling. |
| Sep 15, 2017 | Read third time. Passed. Ordered to the Assembly. |
| Jul 18, 2017 | Read second time. Ordered to third reading. |
| Jul 17, 2017 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| Jul 6, 2017 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 7. Noes 0.) (July 5). Re-referred to Com. on APPR. |
| Jun 8, 2017 | Referred to Com. on EQ. |
| May 30, 2017 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 30, 2017 | Read third time. Passed. Ordered to the Senate. (Ayes 73. Noes 0. Page 1784.) |
| May 26, 2017 | Read third time and amended. Ordered to third reading. (Page 1706.) |
| Apr 27, 2017 | Read second time. Ordered to third reading. |
| Apr 26, 2017 | From committee: Do pass. (Ayes 11. Noes 4.) (April 26). |
| Mar 8, 2017 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 5. Noes 2.) (March 7). Re-referred to Com. on APPR. |
| Feb 6, 2017 | Referred to Com. on E.S. & T.M. |
| Jan 31, 2017 | From printer. May be heard in committee March 2. |
| Jan 30, 2017 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 15, 2017 | Assembly 3rd Reading AB248 Reyes et al. By Leyva | Senate Floor |
Passed |
|
| Jul 5, 2017 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Environmental Quality |
Passed |
|
| May 30, 2017 | AB 248 REYES Assembly Third Reading | Assembly Floor |
Passed |
|
| Apr 26, 2017 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Mar 7, 2017 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Environmental Safety and Toxic Materials |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Breast Cancer Prevention Partners | ** Support | Mar 3, 2017 |
| California Chamber Of Commerce | ** Against | Mar 3, 2017 |
| California Communities Against Toxics | ** Support | Jul 19, 2017 |
| California Environmental Justice Alliance | ** Support | Jul 19, 2017 |
| California League Of Conservation Voters | ** Support | Jul 19, 2017 |
| California Safe Schools | ** Support | Jul 19, 2017 |
| Center For Environmental Health | ** Support | Jul 19, 2017 |
| Center on Race Poverty and the Environment | ** Support | Jul 19, 2017 |
| cleanharbors | ** Against | Jul 19, 2017 |
| Coalition for a Safe Environment | ** Support | Jul 19, 2017 |
| Coalition For Clean Air | * Support | Mar 7, 2017 |
| Desert Citizens Against Pollution | ** Support | Jul 19, 2017 |
| East Yard Communities for Environmental Justice | * Support | Mar 7, 2017 |
| Environmental Working Group | ** Support | Jul 19, 2017 |
| Metal Finishing Association Of Northern California | ** Against | Mar 3, 2017 |
| Metal Finishing Association Of Southern California | ** Against | Mar 3, 2017 |
| Natural Resources Defence Council | * Support | Jul 5, 2017 |
| Natural Resources Defense Council | ** Support | Mar 3, 2017 |
| Safety-Kleen | ** Against | Jul 19, 2017 |
| Sierra Club California | ** Support | Jul 19, 2017 |
| Society for Positive Action | ** Support | Jul 19, 2017 |
| Southwest California Legislative Council | ** Against | Mar 3, 2017 |
| West Coast Lumber & Building Material Association | ** Against | Mar 3, 2017 |
GOVERNOR'S VETO
GV Bill Id:AB 248
Author:(Reyes, et al.)
As Enrolled Ver:September 19, 2017
2/3 vote
Committee | Votes | Ayes | Noes |
Environmental Safety | 5-2 | Quirk, Arambula, Cristina Garcia, Gomez, Holden | Dahle, Chen |
Appropriations | 11-4 | Gonzalez Fletcher, Bloom, Bocanegra, Bonta, McCarty, Chau, Eggman, Friedman, Eduardo Garcia, Muratsuchi, Reyes | Bigelow, Brough, Fong, Obernolte |
ASSEMBLY: | 73-0 | (May 30, 2017) | SENATE: | 37-0 | (September 15, 2017) |
SUMMARY: Makes statutory changes to improve the permitting process for hazardous waste facilities. Specifically, this bill:
- Requires an owner or operator of a permitted hazardous waste facility who plans to submit a renewal application for a hazardous waste facility permit (permit), for permits that expire prior to July 1, 2020, to submit a Part A and Part B application six months before the permit expires, in order for the department to begin its administrative review of the Part A and Part B application.
- Requires an owner or operator of a permitted hazardous waste facility who plans to submit a renewal application for a hazardous waste facility permit, for permits that expire after July 1, 2020, to submit a Part A and Part B application at least two years before the permit expires, in order for the department to begin its administrative review of the Part A and Part B application.
- Requires the Department of Toxic Substances Control (DTSC), within 90 days of receiving a complete application for a hazardous waste facility permit, to post on its Internet Web site an estimated timeline, including key milestones, for DTSC's review process of the application.
EXISTING LAW:
- Authorizes DTSC to issue hazardous waste facilities permits for the use and operation of one or more hazardous waste management units at a facility that meets the standards adopted pursuant to the Hazardous Waste Control Law (HWCL). (Health and Safety Code (HSC) Section 25200(a))
- Requires a hazardous waste facilities permit issued by DTSC to be for a fixed term, not to exceed 10 years. (HSC Section 25200(c)(1)(A))
- Requires an owner or operator of a hazardous waste facility who intends to extend the term of the permit, before the fixed term expires, to submit a complete Part A application. (HSC Section 25200(c)(1)(B))
- States that when a complete Part A renewal application has been submitted before the end of the permit's fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal. (HSC Section 25200(c)(1)(B))
- Requires an owner or operator of a permitted hazardous waste facility to submit an application for permit renewal at least 180 days before the expiration date of the permit. (22 California Code of Regulations (CCR) Section 66270.10)
FISCAL EFFECT: According to the Assembly Appropriations Committee, should this bill be enacted, "Any additional DTSC costs are absorbable or supported by permit fee revenue."
COMMENTS: Need for the bill: According to the author: "DTSC has a long standing failure to protect California's disadvantaged communities through its lack of enforcement and oversight of its hazardous waste facilities permitting process. The current process has created a class of facilities who continue operation without adequate review of the facilities operation. The 2015-2016 Budget Act created a three-person Independent Review Panel (IRP) to oversee DTSC's permitting, enforcement, and fiscal management. The IRP is tasked to report on DTSC's performance, specifically related to permitting, enforcement, backlog reductions, and meeting legislative mandates. The IRP released multiple reports in 2016, and provided various recommendations on the aforementioned categories. Included in these recommendations to 'require applicants to submit application information on a timely basis, and establish accountability mechanisms.'"
DTSC's hazardous waste management permitting program: DTSC is responsible for administering the hazardous waste facility permitting program established under the California HWCL and the federal Resource Conservation and Recovery Act (RCRA). The core activities of the permitting program include: review of RCRA and non-RCRA hazardous waste permit applications to ensure safe design and operation; issuance and denial of operating permits; issuance of post-closure permits; approval and denial of permit modifications; issuance and denial of emergency permits; review and approval of closure plans; oversight of approved closure plans; and providing public involvement on issues related to permitted facilities. The Part A application consists of general information such as where the facility is located and the name and contact information for the owner and operator. The Part B application contains the more technical information about each regulated hazardous waste unit at the facility including engineering and financial information. The Part B application is generally thousands of pages long. In general, DTSC issues permits for complex and large facilities, such as Class I landfills, large treatment facilities, and for facilities managing RCRA hazardous waste. Presently there are 119 permitted hazardous waste facilities in California.
At any point in the permit application review process, if DTSC finds that the facility does not meet applicable standards, it can deny the permit application. Either an approval or denial by DTSC is considered a permit decision. Federal and state law allows facilities with expired permits to continue to operate if the facility has submitted an application for renewal that is administratively complete in advance of the permit expiration date. These types of permits (i.e., expired permits for a facility that has submitted an administratively complete application for a permit renewal) are referred to as "continued permits."
DTSC Independent Review Panel (IRP): In 2015, the Legislature passed and the Governor signed, SB 83 (Budget and Fiscal Review Committee) Chapter 24, Statutes of 2015 which establishes within DTSC a three-member IRP to review and make recommendations regarding improvements to DTSC's permitting, enforcement, public outreach, and fiscal management.
Within its December 2016 report to the Governor and Legislature, the IRP made several recommendations that would require a change in statute. One of those recommendations, requiring that permit applicants submit their applications two years prior to their permit expiring, is contained in this bill. This year, a package of Assembly bills has been introduced to implement several of the IRP's recommendations.
Ensuring that hazardous waste facilities are managed safely begins with proper and timely permitting by DTSC. These facilities handle dangerous substances and involve complex processes, making the review of permit applications challenging, yet extremely important. Before DTSC embarked upon improving the permitting program, the average time it took to process an application was 4.4 years, with some applications continuing 10-20 years past the expiration of their permit. Given the dangerous nature of substances at these facilities, it is important that the public be kept informed about these facilities, including the siting, permit process, and enforcement actions taken at these facilities. Currently, the only time the public is involved in the permit process is when there is a draft permit decision released by DTSC. If a permit application takes 10 years to review, that means it could have been 20 years since the public has been provided information about the hazardous waste facility in their backyard. DTSC's permit improvements have a stated goal of being able to process 90% of the permit applications within two years, however under current law; this means that even if DTSC achieves this goal, all of these permits will exceed their expiration by a year and a half. This bill rectifies that situation by requiring the permit applicant to submit their application two years in advance of their permit expiring, thereby creating a situation where the vast majority of these permits are processed before they reach their expiration date.
The DTSC IRP has had numerous meetings during the past year and a half and has heard frequently from community members that live near these hazardous waste facilities. One of the biggest criticisms of DTSC has been a lack of transparency, meaning the community members feel that information goes into DTSC and years later a decision is announced. This bill adds transparency to DTSC's permitting process by requiring DTSC to post an estimated timeline of the permit review process on their Web site. This will provide all stakeholders, including the community that lives near the facility, as well as the permitted facility, with an ability to see the permit review process unfold. This transparency will also allow stakeholders to hold DTSC accountable if the permit review process begins to drag on without a permit decision.
This bill would require the owner or operator of a hazardous waste facility to submit an application for a permit renewal either six months or two years prior to expiration, depending on the expiration date of the permit.
There is no question that comprehensive reform of the Department's operation is needed and the Administration is committed to working with the Legislature on that task. When it comes to protecting the public health of our communities, government cannot afford to make promises it cannot keep.
Adding new responsibilities to the Department must be undertaken holistically while considering the resources and funding available. Doing anything less robs the community of a real solution and sets government up for failure.
Addressing the structural problems at the Department, both fiscal and administrative, will not be an easy task, but one that is achievable if the Administration and the Legislature work together. I look forward to the partnership.
Analysis Prepared by: Josh Tooker / E.S. & T.M. / (916) 319-3965 FN: 0002449
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB |
THIRD READING
Bill No: AB 248
:
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 7-0, 7/5/17
AYES: Wieckowski, Stone, Gaines, Hill, Lara, Skinner, Stern
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 73-0, 5/30/17 - See last page for vote
DIGEST:
This bill requires owners or operators of a permitted hazardous waste facility to meet a specified schedule for submittal of a permit renewal application.
Existing law:
- Governs, under the federal Resource Conservation and Recovery Act (RCRA) of 1976, the disposal of hazardous waste:
- Sets, through regulation, standards for the treatment, storage, transport, tracking and disposal of hazardous waste in the United States.
- Authorizes states to carry out many of the functions of the federal law through their own hazardous waste laws if such programs have been approved by the United States Environmental Protection Agency (US EPA).
- Sets, by regulation, the penalties for hazardous waste management violations at $70,000.
- Provides that under the California Hazardous Waste Control Act (HWCA) of 1972:
- Establishes the Hazardous Waste Control program.
- Regulates the appropriate handling, processing and disposal of hazardous and extremely hazardous waste to protect the public, livestock and wildlife from hazards to health and safety.
- Authorizes the Department of Toxic Substances Control (DTSC) to issue hazardous waste facilities permits for the use and operation of one or more hazardous waste management units at a facility that meets the standards adopted pursuant to the Hazardous Waste Control Law.
- Requires a hazardous waste facilities permit issued by DTSC to be for a fixed term, not to exceed 10 years.
- Requires an owner or operator of a hazardous waste facility who intends to extend the term of the permit, before the fixed term expires, to submit a complete Part A application.
- States that when a complete Part A renewal application has been submitted before the end of the permit’s fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.
- Requires, by regulation, an owner or operator of a permitted hazardous waste facility to submit an application for permit renewal at least 180 days before the expiration date of the permit.
This bill:
- Requires an owner or operator of a permitted hazardous waste facility who plans to submit a renewal application for a hazardous waste facility permit (permit), for permits that expire prior to July 1, 2020, to submit a Part A and Part B application six months before the permit expires, in order for DTSC to begin its administrative review of the Part A and Part B application.
- Requires an owner or operator of a permitted hazardous waste facility who plans to submit a renewal application for a hazardous waste facility permit, for permits that expire after July 1, 2020, to submit a Part A and Part B application at least two years before the permit expires, in order for DTSC to begin its administrative review of the Part A and Part B application.
- Requires DTSC, within 90 days of receiving a complete application for a hazardous waste facility permit, to post on its Internet Web site an estimated timeline, including key milestones, for DTSC’s review process of the application.
Background
- DTSC hazardous waste management. DTSC is responsible for protecting public health and the environment by overseeing the state’s response to releases of hazardous substances and disposal of hazardous waste. DTSC investigates, removes and remediates contamination as part of that mission. The Hazardous Waste Management Program is one of DTSC’s four major divisions.
This program is responsible for issuing permit decisions for proposed new hazardous waste facilities and the approximately 120 existing hazardous waste facilities in California that treat, store, and dispose of hazardous waste. The program’s staff conducts inspections and takes enforcement actions to ensure compliance with hazardous waste laws and regulations. This program oversees the hazardous waste generator program. In addition, it provides hazardous waste management-related policy support, regulatory and statutory interpretation, financial assurance, and data management support for internal and external stakeholders. The program also provides emergency response support for hazardous materials-related emergencies throughout California.
- DTSC hazardous waste management performance. There has been significant dissatisfaction with the performance of DTSC’s permitting office, directed at the cost and length of time in completing the permit process and a perception that the office does not deny or revoke permits as often as it should to address community concerns. The stakeholder interviews conducted as part of this study identified the following major concerns:
- The need to create clear and objective criteria for making denial/revocation decisions that are based on valid standards of performance and risk.
- A clear standard for violations that would lead to a denial or revocation.
- The need for DTSC to document and measure a “scorecard” of attributes that would be perceived as a “good result” for the permitting program.
DTSC entered into a contract with CPS HR Consulting on February 1, 2013, to conduct a permitting process review and analysis.
CPS HR was asked to review the existing permitting program and develop a recommended standardized process with clear decision criteria and corresponding standards of performance. CPS HR was also asked to document the changes in the permitting process over the past five years based primarily on the record obtained from past internal review, and to obtain perspectives of designated subject matter experts, including representatives from the environmentalist, environmental justice, and industry communities. This report provides findings in each defined area.
The study found that the overall average permitting process time, which was 5.0 years prior to FY 2003, improved to a 3.2 year average for the period from FY 2003 to FY 2007, before again increasing to 4.3 years in the most recent time period (from FY 2008 through part of FY 2013). So while there was an improvement from the oldest period studied to the most recent, the current trend is again towards longer processing time.
The study notes several key findings regarding the recent increase in permit processing time which is attributed to at least two major factors:
- There was a reduction in staffing in the office. Permitting staffing has been reduced significantly from 95.8 personnel years utilized in FY 2007 to just 24.6 personnel years utilized in FY 2009. The initial change was a response to the economic recession in 2009, and its required state budget reductions. However, less than 26.1 personnel years have been utilized in each year since that time.
- The study found that the second primary reason for permitting delays is poor management practices. Between December 2009 and June 2013, the Permitting Program Office did not maintain consistent uniform management, supervisory structure or clear consistent organizational structure. This is demonstrated by the fact that program managers were either re‐assigned to other duties or vacant for a majority of the time period from July 2009 through July 2013, while program supervisor positions for all personnel in the unit were either not authorized or vacant for more than half of this period. In other words, there was a four‐year period in which direct supervision of personnel lapsed.
This study concludes that while many aspects of the work process required for a permit renewal are well-defined and well-known, most of the difficult or complex steps are not clear or well-defined. This is one of the most likely reasons for prolonged delays, and for future process improvement.
The study further stated that much of the “process” knowledge within the Office of Permitting is in the individual professional knowledge of the DTSC staff which is interpretive and not documented. More importantly, a re-review of the Permit Renewal Team effort of 2007‐2009 has not found any structural changes or permanent process changes that have been implemented that could cause significantly improved permit renewals in the future. According to CPS HR the “lessons learned” from the renewal team effort appear to have been misconstrued, and the actions taken after the team experience were damaging to management and supervision in the unit.
According to DTSC, for several years, DTSC’s efforts to carry out this mission were compromised by deficiencies in technical and administrative processes and procedures, from a misaligned personnel system to insufficient coordination between programs. These systemic issues resulted in a structural budget deficit; $184.5 million in uncollected cleanup costs dating back 26 years; a growing backlog of applications to renew hazardous waste permits; and decreased stakeholder confidence and public trust in DTSC.
- Legislative oversight. Specific incidents across California have exposed and continue to expose glaring failings in DTSC’s implementation of its core programs as well as its support programs.
The mishandling of the hazardous waste facility permitting and enforcement of first the Exide and now the Quemetco battery recycling facilities; neglected cost-recovery efforts for cleanups across the state leading to an accumulation of 1,661 projects totaling almost $194 million in uncollected cleanup costs dating back 26 years; a growing backlog of applications to renew hazardous waste permits; delayed site remediation; failed public participation and transparency activities; and personnel issues have all led to decreased stakeholder confidence and public trust in DTSC’s ability to meet its mandate to protect public health and the environment.
Over the last five years, the Legislature has conducted numerous hearings on DTSC’s internal controls, its business practices, and its basic statutory obligations. In those hearings, the budget and policy committees have evaluated the following four main areas: (a) reviewing and monitoring DTSC’s strategic plan and reorganization; (b) auditing cost recovery at DTSC; (c) providing staffing to improve permit backlogs and business operations; and, (d) improving enforcement at DTSC.
Numerous statutory changes have been made to clarify and strengthen the statute to help DTSC better achieve its mandates, and budget augmentations have been made to give DTSC the resources to reduce backlogs and address outstanding programmatic failings. However, many of the underlying concerns about transparency, accountability, and long-term stability of DTSC programs remain.
- The Independent Review Panel. With the aim of identifying and addressing the continued failings of DTSC to meet its public health and environmental protection mandates, SB 83 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2015) established an Independent Review Panel (IRP) to review and make recommendations regarding improvements to DTSC’s permitting, enforcement, public outreach, and fiscal management with the goal of resolving the outstanding operational problems within DTSC and creating strong statutory mandates and accountability in the long term.
The IRP is comprised of three individuals: an appointee of the Speaker of the Assembly with scientific experience related to toxic materials, an appointee of the Senate Rules Committee who is a community representative, and an appointee of the Governor who is a local government management expert.
The IRP additionally advises DTSC on issues related to its reporting obligations, making recommendations for improving DTSC’s programs, and advises DTSC, along with the other California Environmental Protection Agency boards and departments, to “institute quality government programs to achieve increased levels of environmental protection and the public’s satisfaction through improving the quality, efficiency, and cost-effectiveness of the state programs” and “submit a biennial report to the Governor and Legislature, no later than December 1 with respect to the previous two fiscal years, reporting on the extent to which these state agencies have attained their performance objectives, and on their continuous quality improvement efforts.”
Comments
- Purpose of bill. According to the author, DTSC has a long standing failure to protect California’s disadvantaged communities through its lack of enforcement and oversight of its hazardous waste facilities permitting process. The current process has created a class of facilities who continue operation without adequate review of the facilities operation. The 2015-2016 Budget Act created a three-person IRP to oversee DTSC’s permitting, enforcement, and fiscal management. The IRP is tasked to report every 90 days for a defined period of time on DTSC’s performance, specifically related to permitting, enforcement, backlog reductions, and meeting legislative mandates. The IRP released multiple reports in 2016, and provided various recommendations on the aforementioned categories. Included in these recommendations to “require applicants to submit application information on a timely basis, and establish accountability mechanisms.”
- Incremental change or systemic or both? AB 248 is part of a package of Assembly bills aimed at making targeted statutory changes to DTSC’s hazardous waste management program based on specific recommendations of the IRP.
A question arises as to how many more incremental changes will be made or need to be made to improve DTSC and whether these changes will result in a cure to DTSC’s dis-functionality. The Legislature, the Administration and stakeholders have all pointed to systemic issues and programmatic deficiencies that have impacted DTSC’s ability to fulfill its public health and environmental protection mandates. In the last five years, the Legislature has had more than 20 hearings on DTSC’s deficiencies in both the policy and budget committees in both houses. DTSC and the Governor have initiated audits, panels, reports, and their own initiatives to fix identified problems. The Legislature has passed several reform bills and significantly augmented DTSC’s budget and staff by more than two dozen positions (limited-term and permanent) and millions of dollars.
Many of the measures approved by the Legislature and signed by the Governor directing specific action by DTSC remain undone. Additionally, the IRP has made recommendations for improvements that have not been implemented.
It is clear, that all review and changes to date point to systemic issues at DTSC. At the heart of the criticisms around DTSC’s failings is a lack of accountability and transparency.
While these new bills will result in tightening the statute, additional action is needed to address the systemic problem of greater transparency and accountability within DTSC.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
California Communities Against Toxics
California Environmental Justice Alliance
California League of Conservation Voters
California Safe Schools
Center for Environmental Health
Center on Race Poverty and the Environment
Coalition for a Safe Environment
Desert Citizens Against Pollution
Environmental Working Group
Sierra Club California
Society for Positive Action
Safety-Kleen
ASSEMBLY FLOOR: 73-0, 5/30/17
AYES: Acosta, Aguiar-Curry, Arambula, Baker, Berman, Bigelow, Bloom, Bocanegra, Bonta, Brough, Burke, Caballero, Calderon, Cervantes, Chávez, Chen, Chiu, Chu, Cooley, Cunningham, Dababneh, Dahle, Daly, Flora, Fong, Friedman, Gallagher, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gomez, Gonzalez Fletcher, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Mullin, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Quirk, Quirk-Silva, Reyes, Ridley-Thomas, Rodriguez, Rubio, Salas, Santiago, Steinorth, Mark Stone, Thurmond, Ting, Voepel, Waldron, Weber, Wood, Rendon
NO VOTE RECORDED: Travis Allen, Chau, Choi, Cooper, Eggman, Frazier, Harper
7/19/17 15:19:52
**** END ****
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Wieckowski, Chair
2017 - 2018 Regular
Bill No: AB 248
Author: | Reyes, et al. | ||
Version: | 5/26/2017 | Hearing Date: | 7/5/2017 |
Urgency: | No | Fiscal: | Yes |
Consultant: | Rachel Machi Wagoner | ||
SUBJECT: Hazardous waste: facilities: permits.
ANALYSIS:
Existing law:
- Under the federal Resource Conservation and Recovery Act (RCRA) of 1976, governs the disposal of hazardous waste:
- Through regulation, sets standards for the treatment, storage, transport, tracking and disposal of hazardous waste in the United States.
- Authorizes states to carry out many of the functions of the federal law through their own hazardous waste laws if such programs have been approved by the United States Environmental Protection Agency (US EPA).
- Sets, by regulation, the penalties for hazardous waste management violations at $70,000.
- Under the California Hazardous Waste Control Act (HWCA) of 1972:
- Establishes the Hazardous Waste Control program.
- Regulates the appropriate handling, processing and disposal of hazardous and extremely hazardous waste to protect the public, livestock and wildlife from hazards to health and safety.
- Authorizes the Department of Toxic Substances Control (DTSC) to issue hazardous waste facilities permits for the use and operation of one or more hazardous waste management units at a facility that meets the standards adopted pursuant to the Hazardous Waste Control Law.
- Requires a hazardous waste facilities permit issued by DTSC to be for a fixed term, not to exceed 10 years.
- Requires an owner or operator of a hazardous waste facility who intends to extend the term of the permit, before the fixed term expires, to submit a complete Part A application.
- States that when a complete Part A renewal application has been submitted before the end of the permit’s fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal.
- Requires, by regulation, an owner or operator of a permitted hazardous waste facility to submit an application for permit renewal at least 180 days before the expiration date of the permit.
This bill:
- Requires an owner or operator of a permitted hazardous waste facility who plans to submit a renewal application for a hazardous waste facility permit (permit), for permits that expire prior to July 1, 2020, to submit a Part A and Part B application six months before the permit expires, in order for the department to begin its administrative review of the Part A and Part B application.
- Requires an owner or operator of a permitted hazardous waste facility who plans to submit a renewal application for a hazardous waste facility permit, for permits that expire after July 1, 2020, to submit a Part A and Part B application at least two years before the permit expires, in order for the department to begin its administrative review of the Part A and Part B application.
- Requires the Department of Toxic Substances Control (DTSC), within 90 days of receiving a complete application for a hazardous waste facility permit, to post on its Internet Web site an estimated timeline, including key milestones, for DTSC’s review process of the application.
Background
- DTSC Hazardous Waste Management. DTSC is responsible for protecting public health and the environment by overseeing the state’s response to releases of hazardous substances and disposal of hazardous waste. DTSC investigates, removes and remediates contamination as part of that mission. The Hazardous Waste Management Program is one of DTSC’s four major divisions.
This program is responsible for issuing permit decisions for proposed new hazardous waste facilities and the approximately 120 existing hazardous waste facilities in California that treat, store, and dispose of hazardous waste. The program’s staff conducts inspections and takes enforcement actions to ensure compliance with hazardous waste laws and regulations. This program oversees the hazardous waste generator program. In addition, it provides hazardous waste management-related policy support, regulatory and statutory interpretation, financial assurance, and data management support for internal and external stakeholders. The program also provides emergency response support for hazardous materials-related emergencies throughout California.
- Exide Technologies, Vernon, California. The Exide facility in Vernon, California was one of two secondary lead smelting facilities in California which recovered lead from recycled automotive batteries. It has over 100 employees. It recycles 23,000 to 41,000 batteries daily and has an average production of 100,000 to 120,000 tons of lead per year.
The facility has been used for a variety of metal fabrication and metal recovery operations since 1922. Previous owners have included Morris P. Kirk & Sons, Inc., NL Industries, Gould Inc., and GNB Inc.
The facility in Vernon has been operating with an interim hazardous waste facility permit since 1981.
In recent years, the Exide facility has brought to light the failings of DTSC’s Permitting Program. Over the 30 years that the facility operated with an interim permit, there were many violations of the permit as well as other regulatory standards, such as those by the South Coast Air Quality Management District, which caused environmental damage and risk to public health.
In March, 2015 it was announced that an agreement was reached between the United States Department of Justice and Exide Technologies to permanently close the battery recycling facility in Vernon, CA, and in order to avoid criminal prosecution, Exide Technologies further agreed to a stipulation and order with DTSC to complete remediation activities as specified in the stipulation and order issued by DTSC.
This example of a failed process calls into question whether the statutory authorizations, requirements and direction to DTSC is adequate to ensure that the program runs correctly and is appropriately protective of public health and the environment, especially in the vulnerable communities where there are permitted facilities.
Additionally, it called into question whether there are other facilities that may currently be similarly causing harm to the communities in which they are located.
The community crisis around Exide created significant concern about DTSC’s permitting statutory authorization and implementation.
- DTSC Hazardous Waste Management Performance. There has been significant dissatisfaction with the performance of DTSC’s permitting office, directed at the cost and length of time in completing the permit process and a perception that the Office does not deny or revoke permits as often as it should to address community concerns. The stakeholder interviews conducted as part of this study identified the following major concerns:
- The need to create clear and objective criteria for making denial/revocation decisions that are based on valid standards of performance and risk.
- A clear standard for violations that would lead to a denial or revocation.
- The need for the Department to document and measure a “scorecard” of attributes that would be perceived as a “good result” for the permitting program.
DTSC entered into a contract with CPS HR Consulting on February 1, 2013, to conduct a permitting process review and analysis.
CPS HR was asked to review the existing permitting program and develop a recommended standardized process with clear decision criteria and corresponding standards of performance. CPS HR was also asked to document the changes in the permitting process over the past five years based primarily on the record obtained from past internal review, and to obtain perspectives of designated subject matter experts, including representatives from the environmentalist, environmental justice, and industry communities. This report provides findings in each defined area.
The study found that the overall average permitting process time, which was 5.0 years prior to FY 2003, improved to a 3.2 year average for the period from FY 2003 to FY 2007, before again increasing to 4.3 years in the most recent time period (from FY 2008 through part of FY 2013). So while there was an improvement from the oldest period studied to the most recent, the current trend is again towards longer processing time.
The study notes several key findings regarding the recent increase in permit processing time which is attributed to at least two major factors:
- There was a reduction in staffing in the office. Permitting staffing has been reduced significantly from 95.8 personnel years utilized in FY 2007 to just 24.6 personnel years utilized in FY 2009. The initial change was a response to the economic recession in 2009, and its required state budget reductions. However, less than 26.1 personnel years have been utilized in each year since that time.
- The study found that the second primary reason for permitting delays is poor management practices. Between December 2009 and June 2013, the Permitting Program Office did not maintain consistent uniform management, supervisory structure or clear consistent organizational structure. This is demonstrated by the fact that program managers were either re‐assigned to other duties or vacant for a majority of the time period from July 2009 through July 2013, while program supervisor positions for all personnel in the unit were either not authorized or vacant for more than half of this period. In other words, there was a four‐year period in which direct supervision of personnel lapsed.
This study concludes that while many aspects of the work process required for a permit renewal are well-defined and well-known, most of the difficult or complex steps are not clear or well-defined. This is one of the most likely reasons for prolonged delays, and for future process improvement.
The study further stated that much of the “process” knowledge within the Office of Permitting is in the individual professional knowledge of the DTSC staff which is interpretive and not documented. More importantly, a re-review of the Permit Renewal Team effort of 2007‐2009 has not found any structural changes or permanent process changes that have been implemented that could cause significantly improved permit renewals in the future. According to CPS HR the “lessons learned” from the renewal team effort appear to have been misconstrued, and the actions taken after the team experience were damaging to management and supervision in the unit.
According to DTSC, for several years, DTSC’s efforts to carry out this mission were compromised by deficiencies in technical and administrative processes and procedures, from a misaligned personnel system to insufficient coordination between programs. These systemic issues resulted in a structural budget deficit; $184.5 million in uncollected cleanup costs dating back 26 years; a growing backlog of applications to renew hazardous waste permits; and decreased stakeholder confidence and public trust in DTSC.
- DTSC Internal Improvement Initiative: In early 2012, DTSC embarked on its “Fixing the Foundation” initiative, which includes more than 30 different activities intended to improve its operations and restore public trust in the department. Activities include increasing cost recovery from those responsible for hazardous waste contamination, reducing permitting backlogs, strengthening enforcement, and improving the financial sustainability of its operating funds. This effort includes multiple goals at every level of the organization, from staff engagement to permitting backlogs and cost recovery.
In 2014, DTSC released its Permitting Enhancement Work Plan as a comprehensive roadmap to guide efforts to improve DTSC’s ability to issue protective, timely and enforceable permits using more transparent standards and consistent procedures.
In the 2014-15 Budget Act, DTSC requested and was granted 8 limited-term positions and $1.2 million for reduction of backlogged permitting application review.
As part of the 2015-16 Budget Act, DTSC requested an additional $1.632 million and 16 limited-term positions for two years to address the permitting backlog.
- Legislative Oversight. Specific incidents across California have exposed and continue to expose glaring failings in DTSC’s implementation of its core programs as well as its support programs.
The mishandling of the hazardous waste facility permitting and enforcement of first the Exide and now the Quemetco battery recycling facilities; neglected cost-recovery efforts for cleanups across the state leading to an accumulation of 1,661 projects totaling almost $194 million in uncollected cleanup costs dating back 26 years; a growing backlog of applications to renew hazardous waste permits; delayed site remediation; failed public participation and transparency activities; and personnel issues have all led to decreased stakeholder confidence and public trust in DTSC’s ability to meet its mandate to protect public health and the environment.
Over the last five years, the Legislature has conducted numerous hearings on DTSC’s internal controls, its business practices, and its basic statutory obligations. In those hearings, the budget and policy committees have evaluated the following four main areas: (1) reviewing and monitoring the department’s strategic plan and reorganization; (2) auditing cost recovery at the department; (3) providing staffing to improve permit backlogs and business operations; and, (4) improving enforcement at the department.
Numerous statutory changes have been made to clarify and strengthen the statute to help DTSC better achieve its mandates, and budget augmentations have been made to give DTSC the resources to reduce backlogs and address outstanding programmatic failings. However, many of the underlying concerns about transparency, accountability, and long-term stability of DTSC programs remain. - The Independent Review Panel. With the aim of identifying and addressing the
continued failings of DTSC to meet its public health and environmental protection mandates, SB 83 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2015) established an Independent Review Panel (IRP) to review and make recommendations regarding improvements to DTSC’s permitting, enforcement, public outreach, and fiscal management with the goal of resolving the outstanding operational problems within DTSC and creating strong statutory mandates and accountability in the long term.
The IRP is comprised of three individuals: an appointee of the Speaker of the Assembly with scientific experience related to toxic materials, an appointee of the Senate Rules Committee who is a community representative, and an appointee of the Governor who is a local government management expert.
The IRP additionally advises DTSC on issues related to its reporting obligations, making recommendations for improving DTSC’s programs, and advises DTSC, along with the other California Environmental Protection Agency boards and departments, to “institute quality government programs to achieve increased levels of environmental protection and the public’s satisfaction through improving the quality, efficiency, and cost-effectiveness of the state programs” and “submit a biennial report to the Governor and Legislature, no later than December 1 with respect to the previous two fiscal years, reporting on the extent to which these state agencies have attained their performance objectives, and on their continuous quality improvement efforts.”
The IRP is required to report to the Governor and the Legislature every 90 days on DTSC’s progress in reducing permitting and enforcement backlogs, improving public outreach, and improving fiscal management. In addition, the IRP must submit recommendations at the time of the submission of the Governor’s annual budget to the Legislature.
Pursuant to SB 83, the IRP is authorized until January 1, 2018.
To date the IRP has released seven reports and conducted more than a dozen public meetings. In December, 2016, the IRP released a thorough list of recommendations compiled from the meetings and reports conducted in the IRP’s first 11 months. That report contained a compendium of the recommendations that the IRP made in its quarterly reports during 2016. The compendium shows that of a total of 23 IRP recommendations made, 7 have been adopted by DTSC and 16 have not yet been implemented.
In February, 2017, IRP Chair Kracov, testified before the Senate Committee on Environmental Quality that the IRP continues its work evaluating and making recommendations for administrative, structural and statutory changes for improvements to DTSC. His testimony revealed that less than a third of those recommendations have been implemented and that the IRP shares stakeholder concern and frustration with the lack of implementation of those recommendations. Additionally, Chair Kracov stated that the IRP believes that one of the key improvements needed at DTSC is a transparent and accountable process by which stakeholders can participate in a public way, in the deliberative processes around permits and cleanup orders.
Stakeholders also testified during that hearing and during the IRP hearings supporting changes that would bring greater transparency and accountability to DTSC.
- Legislative Analyst Office – DTSC Review. On April 4, 2017, LAO released its web post entitled, “Department of Toxic Substances Control: Performance Improvement Initiatives Merit Oversight.” LAO discusses DTSC progress to date in addressing its deficiencies, focusing on those programs that have received additional funding and personnel resources, including (1) Hazardous Waste Management Program, (2) Exide Facilities Contamination Cleanup Program, (3) Site Mitigation and Brownfields Reuse Program, and (4) Office of Strategic Planning and Development.
- Hazardous Waste Management Program—Facility Permitting Backlog. The Hazardous Waste Management Program issues permits to facilities that manage waste that is toxic, corrosive, reactive, or ignitable. DTSC issues hazardous waste permits with a 10-year term, and each permit establishes specific conditions that a facility must meet in order to operate.
California has 118 permitted facilities that manage hazardous waste with a total of 127 permits (some facilities have more than one permit). Given the number of permits and permit term, DTSC must process an average of about 13 permit renewal decisions per year in order to prevent a backlog of permit renewal applications from developing. If a facility submits a renewal application on time, the law allows the facility to continue operation under its expired permit (referred to as a continued permit). Facilities operating under a continued permit are held to the standards established in the original permit. They are not required to implement the most recent technologies, practices, and safeguards to prevent releases of hazardous waste into the environment that have been developed since the original permit was approved.
In the spring of 2016, DTSC had 30 permitted facilities—roughly one-quarter—operating under “continued permits” with pending permit renewal applications. Some of these permits had been continued for more than five years.
To address the backlog of continued permits, the Legislature approved in the 2016-17 budget plan $3.6 million to convert eight previously approved limited-term positions to permanent status and to provide 15 additional permanent positions. - Hazardous Waste Management Program—Enforcement Enhancement Initiatives. The Hazardous Waste Management Program is also responsible for administering DTSC’s enforcement program through its Enforcement and Emergency Response Division (EERD) and the Office of Criminal Investigations (OCI). EERD has regulatory authority to enforce hazardous waste laws through administrative and civil enforcement. EERD staff conducts inspections of hazardous waste generators and transporters, as well as of treatment, storage, and disposal facilities. EERD staff also provides technical training and support to local agencies (under the Certified Unified Program Agency system) that perform hazardous waste regulatory functions on behalf of the state. In conjunction with DTSC’s Public Participation Branch, EERD coordinates with community action and environmental justice groups throughout California on hazardous waste issues. Working in collaboration with EERD, OCI investigates complaints of illegal handling of hazardous waste and participates in environmental initiatives focused on high-priority illegal activities.
The 2015-16 budget included two proposals related to improving DTSC’s hazardous waste enforcement activities. First, the Legislature approved $1.4 million in two-year funding and 11 positions to conduct a review of the department’s hazardous waste management enforcement program. Second, the 2015-16 spending plan included $2.1 million and 11 positons for three years to evaluate and implement approaches to address hazardous waste violations in vulnerable communities.
DTSC released the statewide assessment report related to its public engagement efforts in January 2017. The report completed by UC Davis researchers recommended that DTSC (1) establish a more direct and visible connection between public input and decisions made to increase transparency and accountability; (2) engage in earlier, more systematic and sustained interaction with impacted communities; (3) build greater capacity for effective public engagement for both DTSC and stakeholders; and (4) increase access to data and information relevant to decision making. - Exide Facilities Contamination Cleanup Program—Lead Contamination Cleanup. In 2000, Exide Technologies (Exide) purchased a lead-acid battery recycling facility in the City of Vernon that had been operating since 1922. The facility ceased operations in 2014 when DTSC notified Exide that its application for a new permit would be denied. Testing indicated that releases of lead dust from the facility contaminated areas up to 1.7 miles from the facility and impacted thousands of properties including private residences, parks, and schools.
In 2015-16, the Legislature approved increases in spending for the cleanup of properties contaminated by Exide. In August 2015, the Legislature approved $7 million of emergency funding from the Toxic Substances Control Account (TSCA) to (1) test approximately 1,000 properties in the community surrounding Exide, (2) develop a comprehensive cleanup plan, and (3) begin cleanup of the highest priority sites. In addition, SB 93 (de León and Lara, Chapter 9, Statutes of 2016) authorizes a loan of up to $177 million from the General Fund to TSCA to use for activities related to the lead contamination in the communities surrounding the Exide facility. The Governor’s 2017-18 budget assumes that about $96 million of that loan will be spent by the end of the budget year. (To the extent that DTSC recovers costs for the investigation and cleanup from the parties responsible for the contamination, these funds will be used to repay the loan from the General Fund.) The Legislature has expressed its preference that the local community be consulted in the cleanup process.
DTSC estimates that it will investigate 8,500 properties for lead contamination from the Exide facility, and 2,500 properties will be remediated by October of 2019. - Site Mitigation and Brownfields Reuse Program—Cost Recovery Backlog. Under the Site Mitigation and Brownfields Reuse Program, when DTSC incurs costs for the investigation and remediation of contaminated sites, the department is authorized by law to recover its costs from potentially responsible parties (PRPs). In 2013, DTSC identified that its cost recovery efforts had been impeded by various factors, including a lack of statutory authority to require PRPs to provide financial information and a lack of resources to perform cost recovery activities. The Bureau of State Audits (BSA) released a report in August 2014 that made 11 recommendations, including that the Legislature give DTSC the authority to require financial information from PRPs. According to BSA, the lack of such information hindered DTSC’s ability to make an informed decision whether to pursue a PRP for response costs, which impacted DTSC’s ability to ultimately recover these costs. AB 276 (Committee on Environmental Safety and Toxic Materials, Chapter 459, Statutes of 2015) allowed DTSC to require a PRP to provide information regarding its ability to pay for a response action at a hazardous waste site.
- Hazardous Waste Management Program—Facility Permitting Backlog. The Hazardous Waste Management Program issues permits to facilities that manage waste that is toxic, corrosive, reactive, or ignitable. DTSC issues hazardous waste permits with a 10-year term, and each permit establishes specific conditions that a facility must meet in order to operate.
As part of the 2014-15 budget plan, the Legislature approved $1.6 million and 14 positions to recover costs from them. At the time, DTSC estimated that the cost recovery backlog included around $26 million in unbilled or uncollected costs that were recoverable. As part of the 2016-17 budget plan, the Legislature approved $180,000 and two positions to implement AB 276.
As a result of AB 276, DTSC estimated the number of completed ability to pay cases would increase by 25 annually.
Strategic Development Team Established to Create a Culture of Change, Accountability, and Transparency. In recent years, the Legislature has held numerous hearings to discuss deficiencies in DTSC’s programs. During these hearings, the department acknowledged a need to address the issues raised at the hearings.
In 2016-17, the Legislature approved a request for the conversion of five limited-term positions to permanent positions and $747,000 in ongoing funding to establish an Office of Strategic Planning, Performance, and Analysis within DTSC.
LAO concluded that, “over the past few years, the Legislature has approved funding and personnel resources to address specific deficiencies in DTSC’s programs. Even with these new resources, DTSC’s own projections show that for some programs it will be years before the deficiencies are fully remedied. Therefore, it will be important for the Legislature to continue to oversee DTSC’s progress and hold DTSC accountable for producing results over the next several years … In cases where the department is not achieving its performance goals, the Legislature may wish to consider further oversight measures. These could include holding hearings to determine the reason for the lack of progress and whether funding and personnel continue to be justified. It could also include having an independent entity—such as the Bureau of State Audits—conduct program reviews to better understand why the program continues to underperform. In our view, such continued oversight is necessary to ensure that the department continues to improve its performance in several key programs.”
Comments
- Purpose of Bill. According to the author, DTSC has a long standing failure to protect California’s disadvantaged communities through its lack of enforcement and oversight of its hazardous waste facilities permitting process. The current process has created a class of facilities who continue operation without adequate review of the facilities operation. The 2015-2016 Budget Act created a three-person Independent Review Panel (IRP) to oversee DTSC’s permitting, enforcement, and fiscal management. The IRP is tasked to report every 90-days for a defined period of time on DTSC’s performance, specifically related to permitting, enforcement, backlog reductions, and meeting legislative mandates. The IRP released multiple reports in 2016, and provided various recommendations on the aforementioned categories. Included in these recommendations to “require applicants to submit application information on a timely basis, and establish accountability mechanisms.”
- Incremental change or systemic or both? AB 248 is part of a package of Assembly bills aimed at making targeted statutory changes to DTSC’s hazardous waste management program based on specific recommendations of the IRP.
A question arises as to how many more incremental changes will be made or need to be made to improve this department and whether these changes will result in a cure to DTSC’s dis-functionality.
The Legislature, the Administration and stakeholders have all pointed to systemic issues and programmatic deficiencies that have impacted DTSC’s ability to fulfill its public health and environmental protection mandates. In the last five years, the Legislature has had more than 20 hearings on the department’s deficiencies in both the policy and budget committees in both houses. DTSC and the Governor have initiated audits, panels, reports, and their own initiatives to fix identified problems. The Legislature has passed several reform bills and significantly augmented DTSC’s budget and staff by more than two dozen positions (limited-term and permanent) and millions of dollars.
Many of the measures approved by the Legislature and signed by the Governor directing specific action by DTSC remain undone. Additionally, the IRP has made recommendations for improvements that have not been implemented.
It is clear, that all review and changes to date point to systemic issues at DTSC. At the heart of the criticisms around DTSC’s failings is a lack of accountability and transparency.
While these new bills will result in tightening the statute, additional action is needed to address the systemic problem of greater transparency and accountability within DTSC.
Related/Prior Legislation
AB 245 (Quirk, 2017) requires DTSC, within 90 days of receiving a renewal application for a hazardous waste facilities permit, to hold a public meeting; requires DTSC review the financial assurances required to operate a hazardous waste facility at least once every five years; requires DTSC, under specified circumstances, to request an owner or operator of a hazardous waste facility to submit to DTSC for review and approval a written cost estimate to cover activities associated with a corrective action based on available data, history of releases, and site activities, as specified and require the owner or operator, within 90 days of the approval or the imposition of a corrective action cost estimate, as specified, to fund the cost estimate or enter into a schedule of compliance for assurances of financial responsibility for completing the corrective action; requires DTSC to review permit financial assurance every five years; and increases administrative and civil penalties to $37,500. This bill is set to be heard on July 5, 2017 in the Senate Committee on Environmental Quality.
AB 246 (Santiago, 2017) promotes the use of fence line monitoring by hazardous waste facility permit holders. This bill is also set to be heard on July 5, 2017 in the Senate Committee on Environmental Quality.
AB 247 (Garcia, 2017) creates a statewide lead advisory taskforce to review and revise policies and procedures to reduce lead poisoning in the state. This bill is also set to be heard on July 5, 2017 in the Senate Committee on Environmental Quality.
AB 1179 (Kalra, 2017) requires inspection frequencies for DTSC when inspecting permitted hazardous waste facilities. This bill is also set to be heard on July 5, 2017 in the Senate Committee on Environmental Quality.
SB 774 (Leyva, 2017) creates a governing board over DTSC. This bill is set to be heard in the Assembly Committee on Environmental Safety and Toxic Materials on July 11, 2017.
AB 1102 (Santiago, 2016) would have required DTSC to inspect a permitted hazardous waste land disposal facility no less than once per month, inspect a permitted and operating hazardous waste facility no less than four times per calendar year, and inspect a permitted hazardous waste facility no less than two times per calendar year. AB 1102 was held by the author in the Senate Environmental Quality Committee.
AB 1205 (Gomez, 2016) would have required DTSC, within 90 days of receiving a renewal application for a hazardous waste facilities permit, to hold a public meeting for specified purposes in or near the community in which the hazardous waste facility is located and requires DTSC review the financial assurances required to operate a hazardous waste facility at least once every 5 years. If the department’s review finds the financial assurances for a facility to be inadequate, the bill would require the department to notify the owner or operator of the facility and would require the owner or operator to update and adopt adequate financial assurances within 90 days. AB 1205 was held by the author in the Senate Environmental Quality Committee.
AB 1400 (Santiago, 2016) would have required DTSC, as a condition for a new hazardous waste facilities permit or a renewal of a hazardous waste facilities permit, to require a facility operator to install monitoring devices or other equipment at the fence line of the facility to monitor for potential releases from the facility into the surrounding community, except as specified; requires DTSC to grant such a request from a member of the public for a technical assistance grant for the purpose of getting assistance relating to, and information about, a pending hazardous waste facilities permit if DTSC receives the request within one year of the submission of the applicable hazardous waste facilities permit application, and would authorize DTSC to, in its discretion, grant such a request received more than one year from the submission of the applicable permit application, requires the permit applicant to fund the grants; requires DTSC, upon receipt of an application for a new hazardous waste facilities permit or for a renewal of a hazardous waste facilities permit, to post on its Internet Web site that the application has been received, and to include with this information a description of the process for applying for a technical assistance grant. AB 1400 was held by the author in the Senate Environmental Quality Committee.
SB 83 (Committee on Budget and Fiscal Review, Chapter 24, Statutes of 2015) among other things, created the IRP to review and make recommendations for improving DTSC programs, as specified.
SB 673 (Lara, Chapter 611, Statutes of 2015) revises the DTSC’s permitting process and public participation requirements for hazardous waste facilities.
SB 712 (Lara, Chapter 833, Statutes of 2014) requires DTSC, on or before December 31, 2015, to issue a final permit decision on an application for a hazardous waste facilities permit that is submitted by a facility operating under a grant of interim status on or before January 1, 1986, by either issuing a final permit or a final denial of the application.
SB 812 (de León, 2014) would have required DTSC to adopt regulations by January 1, 2017, to specify conditions for new permits and the renewal of existing permits, as specified, and establishes deadlines for the submission and processing of facility applications, as specified. SB 812 was vetoed by Governor Brown.
SOURCE:
Author
SUPPORT:
California Communities Against Toxics
California Environmental Justice Alliance
California League of Conservation Voters
California Safe Schools
Center for Environmental Health
Center on Race Poverty and the Environment
Coalition for a Safe Environment
Desert Citizens Against Pollution
Environmental Working Group
Sierra Club California
Society for Positive Action
OPPOSITION:
CleanHarbors
Safety-Kleen
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 248
Author:(Reyes, et al.)
As Amended Ver:May 26, 2017
Majority vote
Committee | Votes | Ayes | Noes |
Environmental Safety | 5-2 | Quirk, Arambula, Cristina Garcia, Gomez, Holden | Dahle, Chen |
Appropriations | 11-4 | Gonzalez Fletcher, Bloom, Bocanegra, Bonta, McCarty, Chau, Eggman, Friedman, Eduardo Garcia, Muratsuchi, Reyes | Bigelow, Brough, Fong, Obernolte |
SUMMARY: Makes statutory changes to improve the permitting process for hazardous waste facilities. Specifically, this bill:
- Requires an owner or operator of a permitted hazardous waste facility who plans to submit a renewal application for a hazardous waste facility permit (permit), for permits that expire prior to July 1, 2020, to submit a Part A and Part B application six months before the permit expires, in order for the department to begin its administrative review of the Part A and Part B application.
- Requires an owner or operator of a permitted hazardous waste facility who plans to submit a renewal application for a hazardous waste facility permit, for permits that expire after July 1, 2020, to submit a Part A and Part B application at least two years before the permit expires, in order for the department to begin its administrative review of the Part A and Part B application.
- Requires the Department of Toxic Substances Control (DTSC), within 90 days of receiving a complete application for a hazardous waste facility permit, to post on its Internet Web site an estimated timeline, including key milestones, for DTSC's review process of the application.
EXISTING LAW:
- Authorizes DTSC to issue hazardous waste facilities permits for the use and operation of one or more hazardous waste management units at a facility that meets the standards adopted pursuant to the Hazardous Waste Control Law. (Health and Safety Code (HSC) Section 25200 (a))
- Requires a hazardous waste facilities permit issued by DTSC to be for a fixed term, not to exceed 10 years. (HSC Section 25200 (c) (1)(A))
- Requires an owner or operator of a hazardous waste facility who intends to extend the term of the permit, before the fixed term expires, to submit a complete Part A application. (HSC Section 25200 (c) (1)(B))
- States that when a complete Part A renewal application has been submitted before the end of the permit's fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal. (HSC Section 25200 (c)(1)(B))
- Requires an owner or operator of a permitted hazardous waste facility to submit an application for permit renewal at least 180 days before the expiration date of the permit. (22 California Code of Regulations (CCR) Section 66270.10)
FISCAL EFFECT: According to the Assembly Appropriations Committee, should this bill be enacted, "Any additional DTSC costs are absorbable or supported by permit fee revenue."
COMMENTS: Need for the bill: According to the author: "DTSC has a long standing failure to protect California's disadvantaged communities through its lack of enforcement and oversight of its hazardous waste facilities permitting process. The current process has created a class of facilities who continue operation without adequate review of the facilities operation. The 2015-2016 Budget Act created a three-person Independent Review Panel (IRP) to oversee DTSC's permitting, enforcement, and fiscal management. The IRP is tasked to report on DTSC's performance, specifically related to permitting, enforcement, backlog reductions, and meeting legislative mandates. The IRP released multiple reports in 2016, and provided various recommendations on the aforementioned categories. Included in these recommendations to 'require applicants to submit application information on a timely basis, and establish accountability mechanisms.'"
DTSC's hazardous waste management permitting program: DTSC is responsible for administering the hazardous waste facility permitting program established under the California Hazardous Waste Control Law and the federal Resource Conservation and Recovery Act (RCRA). The core activities of the permitting program include: review of RCRA and non-RCRA hazardous waste permit applications to ensure safe design and operation; issuance and denial of operating permits; issuance of post-closure permits; approval and denial of permit modifications; issuance and denial of emergency permits; review and approval of closure plans; oversight of approved closure plans; and providing public involvement on issues related to permitted facilities. The Part A application consists of general information such as where the facility is located and the name and contact information for the owner and operator. The Part B application contains the more technical information about each regulated hazardous waste unit at the facility including engineering and financial information. The Part B application is generally thousands of pages long. In general, DTSC issues permits for complex and large facilities, such as Class I landfills, large treatment facilities, and for facilities managing RCRA hazardous waste. Presently there are 119 permitted hazardous waste facilities in California.
At any point in the permit application review process, if DTSC finds that the facility does not meet applicable standards, it can deny the permit application. Either an approval or denial by DTSC is considered a permit decision. Federal and state law allows facilities with expired permits to continue to operate if the facility has submitted an application for renewal that is administratively complete in advance of the permit expiration date. These types of permits (i.e., expired permits for a facility that has submitted an administratively complete application for a permit renewal) are referred to as "continued permits."
DTSC Independent Review Panel (IRP): In 2015, the Legislature passed and the Governor signed, SB 83 (Budget and Fiscal Review Committee) Chapter 24, Statutes of 2015 which establishes within DTSC a three-member IRP to review and make recommendations regarding improvements to DTSC's permitting, enforcement, public outreach, and fiscal management.
Within its December 2016 report to the Governor and Legislature, the IRP made several recommendations that would require a change in statute. One of those recommendations, requiring that permit applicants submit their applications two years prior to their permit expiring, is contained in this bill. This year, a package of Assembly bills has been introduced to implement several of the IRP's recommendations.
Ensuring that hazardous waste facilities are managed safely begins with proper and timely permitting by DTSC. These facilities handle dangerous substances and involve complex processes, making the review of permit applications challenging, yet extremely important. Before DTSC embarked upon improving the permitting program, the average time it took to process an application was 4.4 years, with some applications continuing 10-20 years past the expiration of their permit. Given the dangerous nature of substances at these facilities, it is important that the public be kept informed about these facilities, including the siting, permit process, and enforcement actions taken at these facilities. Currently, the only time the public is involved in the permit process is when there is a draft permit decision released by DTSC. If a permit application takes 10 years to review, that means it could have been 20 years since the public has been provided information about the hazardous waste facility in their backyard. DTSC's permit improvements have a stated goal of being able to process 90% of the permit applications within two years, however under current law; this means that even if DTSC achieves this goal, all of these permits will exceed their expiration by a year and a half. This bill rectifies that situation by requiring the permit applicant to submit their application two years in advance of their permit expiring, thereby creating a situation where the vast majority of these permits are processed before they reach their expiration date.
The DTSC IRP has had numerous meetings during the past year and a half and has heard frequently from community members that live near these hazardous waste facilities. One of the biggest criticisms of DTSC has been a lack of transparency, meaning the community members feel that information goes into DTSC and years later a decision is announced. This bill adds transparency to DTSC's permitting process by requiring DTSC to post an estimated timeline of the permit review process on their Web site. This will provide all stakeholders, including the community that lives near the facility, as well as the permitted facility, with an ability to see the permit review process unfold. This transparency will also allow stakeholders to hold DTSC accountable if the permit review process begins to drag on without a permit decision.
Analysis Prepared by: Josh Tooker / E.S. & T.M. / (916) 319-3965 FN: 0000525
ASSEMBLY THIRD READING
ATR Bill Id:
Author:(Reyes, et al.)
As Introduced Ver:January 30, 2017
Majority vote
Committee | Votes | Ayes | Noes |
Environmental Safety | 5-2 | Quirk, Arambula, Cristina Garcia, Gomez, Holden | Dahle, Chen |
Appropriations | 11-4 | Gonzalez Fletcher, Bloom, Bocanegra, Bonta, McCarty, Chau, Eggman, Friedman, Eduardo Garcia, Muratsuchi, Reyes | Bigelow, Brough, Fong, Obernolte |
SUMMARY: Makes statutory changes to improve the permitting process for hazardous waste facilities. Specifically, this bill:
- Requires an owner or operator of a permitted hazardous waste facility who plans to submit a renewal application for a hazardous waste facility permit (permit), for permits that expire prior to July 1, 2020, to submit a complete Part A and Part B application six months before the permit expires.
- Requires an owner or operator of a permitted hazardous waste facility who plans to submit a renewal application for a hazardous waste facility permit, for permits that expire after July 1, 2020, to submit a complete Part A and Part B application at least two years before the permit expires.
- Requires the Department of Toxic Substances Control (DTSC), within 90 days of receiving a complete application for a hazardous waste facility permit, to post on its internet Web site an estimated timeline, including key milestones, for DTSC's review process of the application.
EXISTING LAW:
- Authorizes DTSC to issue hazardous waste facilities permits for the use and operation of one or more hazardous waste management units at a facility that meets the standards adopted pursuant to the Hazardous Waste Control Law. (Health and Safety Code (HSC) Section 25200 (a))
- Requires a hazardous waste facilities permit issued by DTSC to be for a fixed term, not to exceed ten years. (HSC Section 25200 (c) (1)(A))
- Requires an owner or operator of a hazardous waste facility who intends to extend the term of the permit, before the fixed term expires, to submit a complete Part A application. (HSC Section 25200 (c) (1)(B))
- States that when a complete Part A renewal application has been submitted before the end of the permit's fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal. (HSC Section 25200 (c)(1)(B))
- Requires an owner or operator of a permitted hazardous waste facility to submit an application for permit renewal at least 180 days before the expiration date of the permit. (22 California Code of Regulations (CCR) Section 66270.10)
FISCAL EFFECT: According to the Assembly Appropriations Committee, should this bill be enacted, "Any additional DTSC costs are absorbable or supported by permit fee revenue."
COMMENTS:
Need for the bill: According to the author: "DTSC has a long standing failure to protect California's disadvantaged communities through its lack of enforcement and oversight of its hazardous waste facilities permitting process. The current process has created a class of facilities who continue operation without adequate review of the facilities operation. The 2015-2016 Budget Act created a three-person Independent Review Panel (IRP) to oversee DTSC's permitting, enforcement, and fiscal management. The IRP is tasked to report on DTSC's performance, specifically related to permitting, enforcement, backlog reductions, and meeting legislative mandates. The IRP released multiple reports in 2016, and provided various recommendations on the aforementioned categories. Included in these recommendations to 'require applicants to submit application information on a timely basis, and establish accountability mechanisms.'"
DTSC's hazardous waste management permitting program: DTSC is responsible for administering the hazardous waste facility permitting program established under the California Hazardous Waste Control Law and the federal Resource Conservation and Recovery Act (RCRA). The core activities of the permitting program include: review of RCRA and non-RCRA hazardous waste permit applications to ensure safe design and operation; issuance and denial of operating permits; issuance of post-closure permits; approval and denial of permit modifications; issuance and denial of emergency permits; review and approval of closure plans; oversight of approved closure plans; and providing public involvement on issues related to permitted facilities. The Part A application consists of general information such as where the facility is located and the name and contact information for the owner and operator. The Part B application contains the more technical information about each regulated hazardous waste unit at the facility including engineering and financial information. The Part B application is generally thousands of pages long. In general, DTSC issues permits for complex and large facilities, such as Class I landfills, large treatment facilities, and for facilities managing RCRA hazardous waste. Presently there are 119 permitted hazardous waste facilities in California.
At any point in the permit application review process, if DTSC finds that the facility does not meet applicable standards, it can deny the permit application. Either an approval or denial by DTSC is considered a permit decision. Federal and state law allows facilities with expired permits to continue to operate if the facility has submitted an application for renewal that is administratively complete in advance of the permit expiration date. These types of permits (i.e., expired permits for a facility that has submitted an administratively complete application for a permit renewal) are referred to as "continued permits."
DTSC Independent Review Panel (IRP): In 2015, the Legislature passed and the Governor signed, SB 83 (Budget and Fiscal Review Committee) Chapter 24, Statutes of 2015 which establishes within DTSC a three-member IRP to review and make recommendations regarding improvements to DTSC's permitting, enforcement, public outreach, and fiscal management.
Within its December 2016 report to the Governor and Legislature, the IRP made several recommendations that would require a change in statute. One of those recommendations, requiring that permit applicants submit their applications two years prior to their permit expiring, is contained in this bill. This year, a package of Assembly bills has been introduced to implement several of the IRP's recommendations.
Ensuring that hazardous waste facilities are managed safely begins with proper and timely permitting by DTSC. These facilities handle dangerous substances and involve complex processes, making the review of permit applications challenging, yet extremely important. Before DTSC embarked upon improving the permitting program, the average time it took to process an application was 4.4 years, with some applications continuing 10-20 years past the expiration of their permit. Given the dangerous nature of substances at these facilities, it is important that the public be kept informed about these facilities, including the siting, permit process, and enforcement actions taken at these facilities. Currently, the only time the public is involved in the permit process is when there is a draft permit decision released by DTSC. If a permit application takes 10 years to review, that means it could have been 20 years since the public has been provided information about the hazardous waste facility in their backyard. DTSC's permit improvements have a stated goal of being able to process 90% of the permit applications within two years, however under current law; this means that even if DTSC achieves this goal, all of these permits will exceed their expiration by a year and a half. This bill rectifies that situation by requiring the permit applicant to submit their application two years in advance of their permit expiring, thereby creating a situation where the vast majority of these permits are processed before they reach their expiration date.
The DTSC IRP has had numerous meetings during the past year and a half and has heard frequently from community members that live near these hazardous waste facilities. One of the biggest criticisms of DTSC has been a lack of transparency, meaning the community members feel that information goes into DTSC and years later a decision is announced. This bill adds transparency to DTSC's permitting process by requiring DTSC to post an estimated timeline of the permit review process on their Web site. This will provide all stakeholders, including the community that lives near the facility, as well as the permitted facility, with an ability to see the permit review process unfold. This transparency will also allow stakeholders to hold DTSC accountable if the permit review process begins to drag on without a permit decision.
Analysis Prepared by: Josh Tooker / E.S. & T.M. / (916) 319-3965 FN: 0000193
Date of Hearing: April 26, 2017
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez Fletcher, Chair
ABPCA Bill Id:AB 248
Author:(Reyes) – As Introduced Ver:January 30, 2017
Policy Committee: | Environmental Safety and Toxic Materials | Vote: | 5 - 2 |
|
| ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill modifies the process for the permitting of hazardous waste facilities. Specifically, this bill:
- Requires an owner or operator of a permitted hazardous waste facility who plans to submit a renewal application for a hazardous waste facility permit (permit), for permits that expire prior to July 1, 2020, to submit a complete Part A and Part B application six months before the permit expires.
- Requires an owner or operator of a permitted hazardous waste facility who plans to submit a renewal application for a hazardous waste facility permit, for permits that expire after July 1, 2020, to submit a complete Part A and Part B application at least two years before the permit expires.
- Requires the Department of Toxic Substances Control (DTSC), within 90 days of receiving a complete application for a hazardous waste facility permit, to post on its internet website an estimated timeline, including key milestones, for DTSC’s review process of the application for a hazardous waste facility permit.
FISCAL EFFECT:
Any additional DTSC costs are absorbable or supported by permit fee revenue.
COMMENTS:
- Rationale. The 2015-16 Budget Act created a three person Independent Review Panel (IRP) to oversee DTSC's permitting, enforcement, public outreach, and fiscal management. The IRP released multiple reports in 2016, and provided various recommendations on the aforementioned categories. The recommendations include requiring permit applicants to submit their applications two years prior to their permit expiring.
This bill is consistent with the IRP recommendation. According to the author, DTSC has a long standing failure to protect California’s disadvantaged communities through its lack of enforcement and oversight of its hazardous waste facilities permitting process. The current process has created a class of facilities who continue operation without adequate review of the facilities operation. By requiring facilities operators to apply before their permits expire, this bill provides more time for DTSC review.
- Background. DTSC is responsible for administering the hazardous waste facility permitting program established under the California Hazardous Waste Control Law and the federal Resource Conservation and Recovery Act (RCRA). In general, DTSC issues permits for complex and large facilities, such as Class I landfills, large treatment facilities, and for facilities managing RCRA hazardous waste. Presently there are 119 permitted hazardous waste facilities in California.
- Related Legislation. AB 245 (Gomez) requires DTSC to review and approve corrective action cost estimates and financial assurances as a condition of an operational hazardous waste facility permit. This bill is scheduled to be heard in this Committee today.
AB 246 (Santiago) gives DTSC the authority to require fence line monitoring by hazardous waste facility permit holders. This bill is pending in this Committee's Suspense File.
AB 247 (C. Garcia) requires the Office of Environmental Health Hazard Assessment to convene a statewide lead taskforce to review and provide recommendations on policies and procedures to reduce lead poisoning in the state. This bill is pending in this Committee's Suspense File.
AB 249 (Gomez) would increase the maximum penalties for hazardous waste violations to make them equivalent to the federal penalties for the same violations. This bill is pending on the Assembly Floor.
AB 1179 (Kalra) would establish frequencies for DTSC to adhere to when inspecting permitted hazardous waste facilities. This bill was heard in the Environmental Safety and Toxic Materials Committee on April 25, 2017.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: March 7, 2017
ASSEMBLY COMMITTEE ON ENVIRONMENTAL SAFETY AND TOXIC MATERIALS
Bill Quirk, Chair
ABPCA Bill Id:AB 248 (
Author:Reyes) – As Introduced Ver:January 30, 2017
SUBJECT: Hazardous waste: facilities: permits
SUMMARY: Makes several statutory changes to improve the permitting process for the permitting of hazardous waste facilities. Specifically, this bill:
1) Requires an owner or operator of a permitted hazardous waste facility who plans to submit a renewal application for a hazardous waste facility permit (permit), for permits that expire prior to July 1, 2020, to submit a complete Part A and Part B application six months before the permit expires.
2) Requires an owner or operator of a permitted hazardous waste facility who plans to submit a renewal application for a hazardous waste facility permit, for permits that expire after July 1, 2020, to submit a complete Part A and Part B application at least two years before the permit expires.
3) Requires the Department of Toxic Substances Control (DTSC), within 90 days of receiving a complete application for a hazardous waste facility permit, to post on its internet website an estimated timeline, including key milestones, for DTSC’s review process of the application for a hazardous waste facility permit.
EXISTING LAW:
1) Authorizes DTSC to issue hazardous waste facilities permits for the use and operation of one or more hazardous waste management units at a facility that meets the standards adopted pursuant to the Hazardous Waste Control Law. (Health and Safety Code (HSC) § 25200 (a))
2) Requires DTSC to impose conditions on each hazardous waste facility permit specifying the types of hazardous wastes that may be accepted for transfer, storage, treatment, or disposal. (HSC § 25200 (a))
3) Requires a hazardous waste facilities permit issued by DTSC to be for a fixed term, not to exceed ten years. (HSC § 25200 (c) (1)(A))
4) Requires an owner or operator of a hazardous waste facility who intends to extend the term of the permit, before the fixed term expires, to submit a complete Part A application. (HSC § 25200 (c) (1)(B))
5) States that when a complete Part A renewal application has been submitted before the end of the permit’s fixed term, the permit is deemed extended until the renewal application is approved or denied and the owner or operator has exhausted all applicable rights of appeal. (HSC § 25200 (c)(1)(B))
6) Requires an owner or operator of a permitted hazardous waste facility to submit an application for permit renewal at least 180 days before the expiration date of the permit. (22 CCR § 66270.10)
FISCAL EFFECT: Unknown
COMMENTS:
Need for the bill: According to the author: “DTSC has a long standing failure to protect California’s disadvantaged communities through its lack of enforcement and oversight of its hazardous waste facilities permitting process. The current process has created a class of facilities who continue operation without adequate review of the facilities operation. The 2015-2016 Budget Act created a three-person Independent Review Panel (IRP) to oversee DTSC’s permitting, enforcement, and fiscal management. The IRP is tasked to report every 90-days for a defined period of time on DTSC’s performance, specifically related to permitting, enforcement, backlog reductions, and meeting legislative mandates. The IRP released multiple reports in 2016, and provided various recommendations on the aforementioned categories. Included in these recommendations to “require applicants to submit application information on a timely basis, and establish accountability mechanisms.”
DTSC’s hazardous waste management permitting program: DTSC is responsible for administering the hazardous waste facility permitting program established under the California Hazardous Waste Control Law and the federal Resource Conservation and Recovery Act (RCRA). The core activities of the permitting program include: review of RCRA and non-RCRA hazardous waste permit applications to ensure safe design and operation; issuance and denial of operating permits; issuance of post-closure permits; approval and denial of permit modifications; issuance and denial of emergency permits; review and approval of closure plans; oversight of approved closure plans; and providing public involvement on issues related to permitted facilities. In general, DTSC issues permits for complex and large facilities, such as Class I landfills, large treatment facilities, and for facilities managing RCRA hazardous waste.
A hazardous waste facility permit granted by DTSC authorizes a facility to transfer, treat, store, or dispose of hazardous waste. Presently there are 119 permitted hazardous waste facilities in California. In order for a facility to gain authorization to treat, store, transfer, or dispose of hazardous waste, its permit application must include a detailed description of the facility’s activities, units, equipment, operation plans, recordkeeping system, procedures for response to accidental release of toxic substances or other emergencies, and training. The application will also contain engineering and structural specifications, closure plans, closure cost estimates, and the mechanism for financial assurance in the event of closure. Ultimately, the applicant must demonstrate the ability to manage the waste in a protective manner. DTSC permit applications must address requirements beyond hazardous waste laws and regulations. For example, the permit process must adhere to the California Environmental Quality Act (CEQA) requirements, which involves a comprehensive review of impacts of the facility on public health and the environment.
At any point in the permit application review process, if DTSC finds that the facility does not meet applicable standards, it can deny the permit application. Either an approval or denial by DTSC is considered a permit decision. Federal and state law allows facilities with expired permits to continue to operate if the facility has submitted an application for renewal that is administratively complete in advance of the permit expiration date. These types of permits (i.e., expired permits for a facility that has submitted an administratively complete application for a permit renewal) are referred to as “continued permits.”
Over the past decade or so, DTSC had received complaints from the public about its permitting program and held meetings with the public, the regulated community, and stakeholders to identify and understand concerns about its permitting program.
In 2012, DTSC commissioned CPS HR Consulting, a non‐profit corporation established under the California Joint Powers Authority, to conduct an external review of the permitting program. The review found that permitting decisions were not timely, taking upwards of four years to complete on average and that the permitting program restructuring from Fiscal Year 08‐09 had resulted in a lack of management structure. The review found that the lack of management structure: was a factor in the poor performance of the program; lacked consistent processes for making permitting decisions; resulted in deficient training of staff; lead to a lack of clarity around when to deny or revoke a permit; and, resulted in a lack of performance metrics.
In early 2014, DTSC developed a Permitting Enhancement Work Plan (Work Plan) to significantly upgrade and strengthen DTSC’s permitting program and to ensure that the problems of the past would not resurface in the future. The Work Plan serves as a comprehensive roadmap to guide DTSC’s efforts to improve the permitting program’s ability to issue protective, timely, and enforceable permits using more transparent standards and consistent procedures. In addition, DTSC mapped, for the first time, the entire permitting process and memorialized it in the form of a baseline flow chart that staff can work from and incorporate future improvements.
Beginning in Fiscal Year 15‐16, DTSC’s permitting program established a performance management approach similar to that used by the DTSC cleanup program. One of the essential elements to the implementation of this performance management approach is the development of an annual work plan. The annual work plan specifies due dates for major milestones in the permitting process on permitting projects, tracks completion of permitting activities, increases communication between staff and management on permit progress, and measures planned versus completed milestones as a performance measure of the permitting program.
DTSC Independent Review Panel (IRP): In 2015, the Legislature passed and the Governor signed, SB 83 (Chapter 24, Statutes of 2015) which establishes within DTSC a three-member IRP to review and make recommendations regarding improvements to the Department’s permitting, enforcement, public outreach, and fiscal management. The statute stipulates that IRP membership shall be comprised of a community representative, a person with scientific experience related to toxic materials, and a local government management expert. The following individuals subsequently received appointments to serve on the Panel: Gideon Kracov, J.D. (community representative and appointee of the Senate Committee on Rules), Dr. Arezoo Campbell (panelist with scientific experience related to toxic materials and appointee of the Speaker of the Assembly), and Mike Vizzier (local government management expert and appointee of the Governor).
The IRP is required to submit recommendations to the Governor and Legislature at the time of each submission of the Governor’s budget, 90 days after the IRP was initially appointed and every 90 days thereafter on the Department’s progress in reducing permitting and enforcement backlogs, improving public outreach, and improving fiscal management. The IRP remains in effect until January 1, 2018.
Beginning with the IRP’s first meeting on November 18, 2015, and including its most recent meeting on December 9, 2016, the Panel has convened 20 public meetings to discuss its work and hear testimony from stakeholders, subject matter experts, elected officials, and representatives of DTSC, and the California Environmental Protection Agency (Cal/EPA).
In its December 2016 report, the IRP found that the task of managing hazardous waste and protecting California’s people and environment from the harmful effects of toxic substances depends on a strong and efficient DTSC. The IRP further believes there are four key themes to achieving a strong foundation for the Department’s long-term organizational strength and efficiency: (1) continuity in executive leadership, (2) a focus on human resources, (3) stable fiscal resources, and (4) increased transparency/accountability.
Additionally the IRP found that there is a widespread perception that DTSC is insular and in need of increased accountability. For example, The People’s Senate stated the following in a March 27, 2015 letter to DTSC Director Barbara Lee, “DTSC makes decisions behind closed doors, with little transparency, oversight, or meaningful opportunity to appeal.”
The IRP also believes it is important for DTSC to set realistic timelines for its work and be accountable for deadlines. For example, DTSC missed recent, self-imposed deadlines to finalize its Improving Enforcement Performance Workplan and to release and begin implementation of UC Davis Collaboration Center recommendations for DTSC’s public engagement efforts.
Also, within its December 2016 report to the Governor and Legislature, the IRP made several recommendations that would require a change in statute. One of those recommendations, requiring that permit applicants submit their applications two years prior to their permit expiring, is contained in AB 248. A package of Assembly bills (see “related legislation”) has been introduced to implement several of the IRP’s recommendations, as well as, Senate bill, SB 774 (Leyva) that creates a new advisory body, likely to replace the IRP once it sunsets at the end of 2017.
Ensuring that hazardous waste facilities are managed safely begins with proper and timely permitting by DTSC. These facilities handle dangerous substances and involve complex processes, making the review of permit applications challenging, yet extremely important. Before DTSC embarked upon improving the permitting program, the average time it took to process an application was 4.4 years, with some applications continuing 10-20 years past the expiration of their permit. Given the dangerous nature of substances at these facilities, it is very important that the public be kept informed about these facilities, including the siting, permit process, and enforcement actions taken at these facilities. Currently the only time the public is involved in the permit process is when there is a draft permit decision released by DTSC. If a permit application takes 10 years to review, that means it could have been 20 years since the public has been provided information about the hazardous waste facility in their backyard. DTSC’s permit improvements have a stated goal of being able to process 90% of the permit applications within 2 years, however under current law; this means that even if DTSC achieves this goal, all of these permits will exceed their expiration by a year and a half. AB 248 rectifies that situation by requiring the permit applicant to submit their application two years in advance of their permit expiring, thereby creating a situation where the vast majority of these permits are processed before they reach their expiration date.
The DTSC IRP has had numerous meetings during the past year and a half and has heard frequently from community members that live near these hazardous waste facilities. One of the biggest criticisms of DTSC has been a lack of transparency, meaning the community members feel that information goes into DTSC and years later a decision is announced. AB 248 adds transparency to DTSC’s permitting process by requiring DTSC to post an estimated timeline of the permit review process on their website. This will provide all stakeholders, including the community that lives near the facility, as well as the permitted facility, with an ability to see the permit review process unfold. This transparency will also allow stakeholders to hold DTSC accountable if the permit review process begins to drag on without a permit decision.
Potential clarification: The opposition has raised a concern that the determination that an application is complete is subject to review by DTSC, which could take months and is outside the control of the applicant. The intent of the bill is not to disrupt the iterative permit application review process; rather AB 248 seeks to simply start the review process sooner. The author and committee may wish to consider an amendment that clarifies this point.
Related legislation:
1) AB 245 (Gomez) would require DTSC to review and approve corrective action cost estimates and financial assurances as a condition of an operational hazardous waste facility permit. This bill is scheduled to be heard in the Assembly Environmental Safety & Toxic Materials Committee on March 7, 2017.
2) AB 246 (Santiago) would give DTSC the authority to require fence line monitoring by hazardous waste facility permit holders. This bill is scheduled to be heard in the Assembly Environmental Safety & Toxic Materials Committee on March 7, 2017.
3) AB 247 (C. Garcia) would require the Office of Environmental Health Hazard Assessment to convene a statewide lead taskforce to review and provide recommendations on policies and procedures to reduce lead poisoning in the state. This bill is scheduled to be heard in the Assembly Environmental Safety & Toxic Materials Committee on March 7, 2017.
4) AB 249 (Gomez) would increase the maximum penalties for hazardous waste violations to make them equivalent to the federal penalties for the same violations. This bill is scheduled to be heard in the Assembly Environmental Safety & Toxic Materials Committee on March 7, 2017.
5) AB 1179 (Kalra) would establish frequencies for DTSC to adhere to when inspecting permitted hazardous waste facilities. This bill is pending referral in the Assembly Rules Committee.
6) SB 774 (Leyva) would establish the Hazardous Waste Management Council to serve as an advisory body to DTSC and the state regarding hazardous waste management issues. This bill is pending referral in the Senate Rules Committee.
REGISTERED SUPPORT / OPPOSITION:
Support
Breast Cancer Prevention Partners
California Environmental Justice Alliance
Center on Race, Poverty, and the Environment
Natural Resources Defense Council
Sierra Club California
Opposition
California Chamber of Commerce
Clean Harbors Environmental Services, Inc.
Metal Finishing Association of Northern California
Metal Finishing Association of Southern California
Safety-Kleen, Inc.
Southwest California Legislative Council
West Coast Lumber & Building Material Association
Analysis Prepared by: Josh Tooker / E.S. & T.M. / (916) 319-3965
Discussed in Hearing
Senate Standing Committee on Environmental Quality
Assembly Floor
Assembly Floor
Assembly Standing Committee on Appropriations
Assembly Standing Committee on Environmental Safety and Toxic Materials
Bill Author
Bill Co-Author(s):