AB 1441: Electricity: electrical corporation procurement plans: resource portfolio.
- Session Year: 2023-2024
- House: Assembly
- Latest Version Date: 2023-03-16
Current Status:
Failed
(2024-02-01: From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation in accordance with specified elements, incentive mechanisms, and objectives. Existing law requires the commission to do various things relating to ensuring the integration of renewable energy resources in the electricity supply. identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. Existing law requires the portfolio to rely upon zero-carbon-emitting resources to the maximum extent reasonable and be designed to achieve the statewide greenhouse gas emissions limit.
This bill would make nonsubstantive changes to these commission duties relating to renewable energy integration. specify that a diverse and balanced portfolio of resources includes an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation in accordance with specified elements, incentive mechanisms, and objectives. Existing law requires the commission to do various things relating to ensuring the integration of renewable energy resources in the electricity supply.
This bill would make nonsubstantive changes to these commission duties relating to renewable energy integration.
The commission shall do all of the following:
(a)(1)Identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. The portfolio shall rely upon zero carbon-emitting zero-carbon-emitting resources to the maximum extent reasonable and be designed to achieve any statewide greenhouse gas emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code) or any successor legislation.
(2)For purposes of paragraph (1), a diverse and balanced portfolio of resources includes an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity.
(b)Direct each electrical corporation to include, as part of its proposed procurement plan, a strategy for procuring best-fit and least-cost resources to satisfy the portfolio needs identified by the commission pursuant to subdivision (a).
(c)Ensure that the net costs of any incremental renewable energy integration resources procured by an electrical corporation to satisfy the need identified in subdivision (a) are allocated on a fully nonbypassable basis consistent with the treatment of costs identified in paragraph (2) of subdivision (c) of Section 365.1.
(d)Permit community choice aggregators to submit proposals for satisfying their portion of the renewable integration need identified in subdivision (a). If the commission finds this need is best met through long-term procurement commitments for resources, community choice aggregators shall also be required to make long-term commitments for resources. The commission shall approve proposals pursuant to this subdivision if it finds all of the following:
(1)The resources proposed by a community choice aggregator will provide equivalent integration of renewable energy.
(2)The resources proposed by a community choice aggregator will promote the efficient achievement of state energy policy objectives, including reductions in greenhouse gas emissions.
(3)Bundled customers of an electrical corporation will be indifferent to the approval of the community choice aggregator proposals.
(e)Ensure that all costs resulting from nonperformance in satisfying the need in subdivision (a) or (d), as applicable, shall be borne by the electrical corporation or community choice aggregator that failed to perform.
CORRECTIONS: HeadingLine 1. DigestPage 1.The commission shall do all of the following:
(a)Identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. The portfolio shall rely upon zero carbon-emitting resources to the maximum extent reasonable and be designed to achieve any statewide greenhouse gas emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code) or any successor legislation.
(b)Direct each electrical corporation to include, as part of its proposed procurement plan, a strategy for procuring best-fit and least-cost resources to satisfy the portfolio needs identified by the commission pursuant to subdivision (a).
(c)Ensure that the net costs of any incremental renewable energy integration resources procured by an electrical corporation to satisfy the need identified in subdivision (a) are allocated on a fully nonbypassable basis consistent with the treatment of costs identified in paragraph (2) of subdivision (c) of Section 365.1.
(d)Permit community choice aggregators to submit proposals for satisfying their portion of the renewable integration need identified in subdivision (a). If the commission finds this need is best met through long-term procurement commitments for resources, community choice aggregators shall also be required to make long-term commitments for resources. The commission shall approve proposals pursuant to this subdivision if it finds all of the following:
(1)The resources proposed by a community choice aggregator will provide equivalent integration of renewable energy.
(2)The resources proposed by a community choice aggregator will promote the efficient achievement of state energy policy objectives, including reductions in greenhouse gas emissions.
(3)Bundled customers of an electrical corporation will be indifferent from to the approval of the community choice aggregator proposals.
(e)Ensure that all costs resulting from nonperformance to satisfy in satisfying the need in subdivision (a) or (d), as applicable, shall be borne by the electrical corporation or community choice aggregator that failed to perform.
|
Date
|
Status
|
|---|---|
| Feb 1, 2024 | From committee: Filed with the Chief Clerk pursuant to Joint Rule 56. |
| Jan 31, 2024 | Died pursuant to Art. IV, Sec. 10(c) of the Constitution. |
| Apr 20, 2023 | Measure version as amended on March 16 corrected. |
| Apr 18, 2023 | In committee: Set, second hearing. Hearing canceled at the request of author. |
| Apr 5, 2023 | In committee: Set, first hearing. Hearing canceled at the request of author. |
| Mar 20, 2023 | Re-referred to Com. on U. & E. |
| Mar 16, 2023 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Mar 16, 2023 | Referred to Coms. on U. & E. and NAT. RES. |
| Feb 18, 2023 | From printer. May be heard in committee March 20. |
| Feb 17, 2023 | Read first time. To print. |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Bill Author
Bill Co-Author(s):