Bills

AB 1441: Electricity: electrical corporation procurement plans: resource portfolio.

  • Session Year: 2023-2024
  • House: Assembly
  • Latest Version Date: 2023-03-16

Current Status:

Failed

(2024-02-01: From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.)

Introduced

In Committee

First Chamber

In Committee

Second Chamber

Enacted

Version:

Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation in accordance with specified elements, incentive mechanisms, and objectives. Existing law requires the commission to do various things relating to ensuring the integration of renewable energy resources in the electricity supply. identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. Existing law requires the portfolio to rely upon zero-carbon-emitting resources to the maximum extent reasonable and be designed to achieve the statewide greenhouse gas emissions limit.

This bill would make nonsubstantive changes to these commission duties relating to renewable energy integration. specify that a diverse and balanced portfolio of resources includes an appropriate mix of renewable capacity, including peaking, dispatchable, baseload, firm, and as-available capacity.

Authors shown for version:
Amended Assembly (3/16/2023)

Bill Author