AB 2731: California Environmental Quality Act: City of San Diego: Old Town Center redevelopment.
- Session Year: 2019-2020
- House: Assembly
- Latest Version Date: 2020-09-29
|
Date
|
Status
|
|---|---|
| Sep 29, 2020 | Chaptered by Secretary of State - Chapter 291, Statutes of 2020. |
| Sep 29, 2020 | Approved by the Governor. |
| Sep 15, 2020 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 31, 2020 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 74. Noes 0. Page 5434.). |
| Aug 30, 2020 | In Assembly. Concurrence in Senate amendments pending. |
| Aug 30, 2020 | Read third time. Passed. Ordered to the Assembly. (Ayes 38. Noes 0.). |
| Aug 28, 2020 | Read second time. Ordered to third reading. |
| Aug 27, 2020 | Read third time and amended. Ordered to second reading. |
| Aug 26, 2020 | Read second time. Ordered to third reading. |
| Aug 25, 2020 | Read third time and amended. Ordered to second reading. |
| Aug 20, 2020 | Read second time. Ordered to third reading. |
| Aug 19, 2020 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| Aug 17, 2020 | Read second time and amended. Re-referred to Com. on APPR. |
| Aug 14, 2020 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 5. Noes 0.) (August 14). |
| Aug 3, 2020 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on EQ. |
| Jul 14, 2020 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on EQ. |
| Jul 2, 2020 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on EQ. |
| Jul 1, 2020 | Referred to Com. on EQ. |
| Jun 11, 2020 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Jun 10, 2020 | Read third time. Passed. Ordered to the Senate. (Ayes 77. Noes 0. Page 4800.) |
| Jun 4, 2020 | Read second time. Ordered to Consent Calendar. |
| Jun 3, 2020 | Read second time and amended. Ordered returned to second reading. |
| Jun 2, 2020 | From committee: Amend, and do pass as amended. To Consent Calendar. (Ayes 18. Noes 0.) (June 2). |
| May 14, 2020 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 9. Noes 0.) (May 13). Re-referred to Com. on APPR. |
| May 7, 2020 | Re-referred to Com. on NAT. RES. |
| May 6, 2020 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| May 5, 2020 | Re-referred to Com. on NAT. RES. |
| May 4, 2020 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| Apr 24, 2020 | Referred to Com. on NAT. RES. |
| Feb 21, 2020 | From printer. May be heard in committee March 22. |
| Feb 20, 2020 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 31, 2020 | AB 2731 Gloria Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Aug 30, 2020 | Assembly 3rd Reading AB2731 Gloria et al. By Atkins | Senate Floor |
Passed |
|
| Aug 14, 2020 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Environmental Quality |
Passed |
|
| Jun 10, 2020 | AB 2731 Gloria Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| Jun 2, 2020 | Do pass as amended. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| May 13, 2020 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 2731
Author:(Gloria)
As Amended Ver:August 27, 2020
Majority vote
SUMMARY:
Establishes expedited administrative and judicial review procedures under the California Environmental Quality Act (CEQA) for the "transit and transportation facilities" (TTF) project, a regional transportation facility in San Diego, including a hub on the Old Town Center (OTC) site and transportation linkages to the regional transportation system and the airport, requiring the courts to resolve lawsuits within 270 business days, to the extent feasible. Provides that the environmental impact statement (EIS) prepared by the Navy pursuant to the National Environmental Policy Act (NEPA) for "transit-oriented development" (TOD) on the Old Town Center site may be used in lieu of an environmental impact report (EIR) under CEQA if the TOD projects and the EIS meet specified environmental and labor requirements.
The Senate Amendments:
- Provide that the requirements of CEQA are satisfied by a specified EIS for a TOD project, as defined, that:
- Is proposed within a transit priority area;
- Is undertaken to implement and is consistent with the land use standards approved by the Navy and San Diego Association of Governments (SANDAG) for the OTC site and the site plan for which an EIR has been certified on or before December 31, 2022, and the site plan meets a vehicle miles traveled reduction of 25% below the regional average vehicle miles traveled identified in a sustainable communities strategy (SCS) or alternative planning strategy (APS);
- Is consistent with the general use designation, density, building intensity, and applicable policies specified in either a SCS or APS for which the Air Resources Board (ARB) has accepted SANDAG's determination that the SCS or the APS would achieve the greenhouse gas (GHG) emissions reduction targets; and
- Complies with specified labor requirements, including payment of prevailing wage and use of a skilled and trained workforce for construction work.
- Requires further environmental review of TOD projects only if:
- Substantial changes are proposed which will require major revisions to the EIR.
- Substantial changes occur with respect to the circumstances under which the project is being undertaken will require major revisions in the EIR.
- New information, which was not known and could not have been known at the time the EIR was certified, becomes available.
- Subjects the TTF project to certain environmental standards including that any facility that is part of the project obtains Leadership in Energy and Environmental Design (LEED) gold certification for new construction within one year of project completion, that the project does not result in any net additional emission of GHGs, that the project has a transportation demand management program, and the project achieves at least 25% reduction in vehicle miles traveled as compared to the regional average vehicle miles traveled identified in a sustainable communities strategy or alternative planning strategy.
- Specifies procedures for the quantification and mitigation of GHG emissions for the TTF project, including requiring the baseline for GHG emissions be established based upon the physical conditions at the project site at the time the application is submitted, prioritizing on-site or local direct GHG emissions reductions, and limiting the use of offsets.
- Requires Judicial Council, by January 1, 2022, to amend certain California Rules of Court that would apply to an action or proceeding brought to attack, review, set aside, void, or annual the certification of an EIR for the TTF project, or the granting of any project approvals, requiring lawsuits and any appeals to be resolved, to the extent feasible, within 270 business days of certification of the record of proceedings (which must occur within five days of the lead agency filing the notice of determination on the project).
- Establishes special procedures for the preparation and certification of the record of proceedings for the TTF project including, among others, that the lead agency prepare the record of proceedings concurrently with the administrative process, all documents in the record be posted on the lead agency's internet website, the lead agency make the draft EIR and documents relied on in the preparation of the EIR public, and any dispute arising from the record of proceedings be resolved by the superior court.
- Establishes special procedures for public participation in CEQA review of the TTF project including, among others, that the project EIR include a specified notice, the lead agency conducts an informational workshop, the lead agency and project proponent participate in nonbinding mediation with parties that submits comments and request mediation, and the lead agency is permitted to ignore written comments submitted after the close of the public comment period.
- Subjects the TTF project and TOD projects to specified labor requirements, including payment of prevailing wage and use of a skilled and trained workforce for construction work.
COMMENTS:
According to the bill's sponsors, SANDAG, the need for this legislation is a timing issue. The bill's sponsor is trying to take advantage of an opportunity to develop what would otherwise be federally-owned land and subject to NEPA. In exchange for SANDAG financing the revitalization of the Naval Information Warfare Systems Command’s (NAVWAR) facilities, the Navy will transfer to SANDAG what remains of the 70.5 acre OTC site for development of TOD projects and the TTF project. The Navy will be able to proceed under normal NEPA requirements for the revitalization of its NAVWAR facilities should an agreement not be finalized between the Navy and SANDAG. While there is nothing that would prevent the Navy and SANDAG from partnering in future years for the development of the OTC site, the sponsors feel that this is a unique opportunity for both the Navy and the City of San Diego to benefit.
According to the Author:
For decades, the San Diego region has explored ways to provide better connectivity to San Diego International Airport, the busiest single-runway airport in the nation. The airport anticipates an increase of 16 million annual passengers by 2050, which would result in a total of 40 million passengers annually. The projected increase in airport passengers is expected to exceed the capacity of current airport roadway connections. Due to the anticipated future growth combined with limited ground transit access to the airport, SANDAG, in partnership with the City of San Diego, the Port of San Diego, and the San Diego County Regional Airport Authority, has made it a chief priority to identify a solution for a direct transit connection to the airport. Optimally positioned near the airport, the OTC site presents great potential to provide an enduring solution to the region's longstanding challenge of airport connectivity and is one of several sites being considered for development of a Central Mobility Hub.
On September 19, 2019, SANDAG and the Navy signed an initial agreement to explore options for redevelopment of the OTC. On January 23 of this year, SANDAG signed the Navy OTC Revitalization Agreement, which lays out a timeline for the Navy and SANDAG to explore the redevelopment of the OTC site to include a Central Mobility Hub. On January 24, the Navy began an environmental analysis of the intended revitalization project in accordance with NEPA. This analysis will enable the Navy to prepare an EIS outlining potential environmental impacts associated with the project. SANDAG will cooperate with the Navy to supplement this environmental analysis to be technically sufficient under CEQA. SANDAG has committed $50 million in funding for continued Central Mobility Hub analysis, which includes environmental analysis, preliminary engineering, and complete corridor planning.
As amended, AB 2731 will strengthen environmental mitigation efforts for both the redevelopment of the NAVWAR facilities and the Central Mobility Hub and will enhance public participation and government transparency while providing certainty of process to allow both projects to begin construction in relatively short order. In light of the COVID-19 pandemic, this project, and the resulting public comment that will follow, will be essential to San Diego's economic recovery.
Arguments in Support:
According to the City of San Diego, AB 2731 is intended to streamline the construction process so that the benefits of this project may be realized quickly. Moreover, this bill will subject the U.S. Navy to provisions of CEQA that would otherwise not be required of the NAVWAR component of the Old Town Center. As the state faces unprecedented unemployment and likely a sustained recession, this project is needed now more than ever.
According to SANDAG, AB 2731 would provide the construct that is needed to support the Navy and SANDAG's partnership to outline a process that ensures the project meets all environmental standards.
Arguments in Opposition:
According to the California Judges Association, the 270-day goal is unrealistic, granting extraordinary calendar priority to these cases means that other litigants are pushed to the back of the line, and litigants are already feeling the effects of under-resourced courts, and expedited review adds to this burden.
The Plumbing-Heating-Cooling Contractors Association and the Western Electrical Contractors Association oppose the requirement that all construction will use a skilled and trained workforce. To comply with this mandate, no fewer than 60% of journey workers will need to have graduated from a California apprenticeship program. This requirement will increase the cost for this work and reduce the number of contractors who can and will bid on these projects. This will also reduce the opportunities for local contractors to bid on this work.
FISCAL COMMENTS:
According to the Senate Appropriations Committee, pursuant to Senate Rule 28.8, negligible state costs.
VOTES:
ASM NATURAL RESOURCES: 9-0-2
YES: Friedman, Flora, Chau, Eggman, Limón, Mathis, McCarty, Muratsuchi, Mark Stone
ABS, ABST OR NV: Brough, Cristina Garcia
ASM APPROPRIATIONS: 18-0-0
YES: Gonzalez, Bigelow, Bauer-Kahan, Bloom, Bonta, Calderon, Carrillo, Chau, Megan Dahle, Diep, Eggman, Fong, Gabriel, Eduardo Garcia, Petrie-Norris, McCarty, Robert Rivas, Voepel
ASSEMBLY FLOOR: 77-0-2
YES: Aguiar-Curry, Arambula, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Megan Dahle, Daly, Diep, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Mullin, Muratsuchi, Nazarian, O'Donnell, Obernolte, Patterson, Petrie-Norris, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Voepel, Waldron, Weber, Wicks, Wood, Rendon
ABS, ABST OR NV: Eggman, Quirk
SENATE FLOOR: 38-0-2
YES: Allen, Archuleta, Atkins, Bates, Beall, Borgeas, Bradford, Caballero, Chang, Dahle, Dodd, Durazo, Galgiani, Glazer, Lena Gonzalez, Grove, Hertzberg, Hill, Hueso, Hurtado, Jackson, Leyva, McGuire, Melendez, Mitchell, Monning, Morrell, Nielsen, Pan, Portantino, Roth, Rubio, Skinner, Stern, Umberg, Wieckowski, Wiener, Wilk
ABS, ABST OR NV: Jones, Moorlach
UPDATED:
VERSION: August 27, 2020
CONSULTANT: Lawrence Lingbloom / NAT. RES. / (916) 319-2092 FN: 0003630
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 2731 |
THIRD READING
Bill No: AB 2731
Author: Gloria (D), et al.
Amended: 8/27/20 in Senate
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 5-0, 8/14/20
AYES: Allen, Hill, Skinner, Stern, Wieckowski
NO VOTE RECORDED: Bates, Dahle
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 77-0, 6/10/20 (Consent) - See last page for vote
SUBJECT: California Environmental Quality Act: City of San Diego: Old Town Center redevelopment
SOURCE: City of San Diego
San Diego Association of Governments
DIGEST:
This bill provides that a specific environmental impact statement satisfies the requirements of the California Environmental Quality Act (CEQA) for a transit-oriented development project, within the Old Town Center site of San Diego; and creates special administrative and judicial review procedures for a specific transit and transportation facilities project, also located within the Old Town Center site, that requires the courts, to the extent feasible, to resolve specific CEQA actions against the project within 270 days.
Senate Floor Amendments of 8/27/20 require the environmental baseline for greenhouse gas (GHG) emissions be established based on the physical conditions for the project site at the time of notice of preparation for the project-level environmental impact report of the transit and transportation facilities project; and require that the offsets credits used to meet the GHG emissions reduction requirement reduce the emissions of criteria air pollutants or toxic air contaminants and are undertaken from sources in the community within which the project is located or adjacent communities.
Senate Floor Amendments of 8/25/20 make various technical changes to specified labor requirements that a project must meet to be eligible for this bill’s proposed CEQA streamlining; and make other technical, but nominally substantive changes.
ANALYSIS:
Existing law:
- Requires federal agencies, under the National Environmental Protection Act (NEPA), to assess the environmental effects of their proposed actions prior to making decisions. Actions include making decisions on permit applications, adopting federal land management actions, and constructing highways and other publicly-owned facilities. (42 United States Code §4321 et seq.)
- Provides for the following, under CEQA:
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration, mitigated declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines). (Public Resources Code (PRC) §21000 et seq.)
- Sets requirements relating to the preparation, review, comment, approval and certification of environmental documents, as well as procedures relating to an action or proceeding to attack, review, set aside, void, or annul various actions of a public agency on the grounds of noncompliance with CEQA. (PRC §21165 et seq.)
This bill:
- Provides that the requirements of CEQA satisfied by a specific Environmental Impact Statement (EIS) for a transit-oriented development (TOD) project, as defined by the bill, that:
- Is proposed within a transit priority area;
- Is undertaken to implement and is consistent with the land use standards approved by the Navy and San Diego Association of Governments (SANDAG) for the Old Town Center (OTC) site and the site plan for which an EIR has been certified on or before December 31, 2022, and the site plan meets a vehicle miles traveled reduction of 25% below the regional average vehicle miles traveled identified in a sustainable communities strategy (SCS) or alternative planning strategy (APS);
- Is consistent with the general use designation, density, building intensity, and applicable policies specified in the OTC site in either a SCS or APS for which the State Air Resources Board (ARB) has accepted SANDAG’s determination that the SCS or the APS would achieve the GHG emissions reduction targets; and
- Complies with certain labor requirements specified by the bill.
- Requires further environmental review of such projects, only, if:
- Substantial changes are proposed which will require major revisions to the EIR.
- Substantial changes occur with respect to the circumstances under which the project is being undertaken will require major revisions in the EIR.
- New information, which was not known and could not have been known at the time the EIR was certified, becomes available.
- Defines “transit and transportation facilities” (TFF) to mean a multimodal regional transportation facility, including a central mobility hub located in the Old Town Center site and transportation linkages that connect the central mobility hub to the regional transportation system and that connect the central mobility hub to the San Diego International Airport.
- Subjects a TTF project to certain environmental standards including that any facility that is part of the project obtains Leadership in Energy and Environmental Design gold certification for new construction within one year of project completion, that the project does not result in any net additional emission of GHGs, that the project has a transportation demand management program, and the project achieves at least 25% reduction in vehicle miles traveled as compared to the regional average vehicle miles traveled identified in a sustainable communities strategy or alternative planning strategy.
- Requires Judicial Council, by January 1, 2022, to amend certain California Rules of Court that would apply to an action or proceeding brought to attack, review, set aside, void, or annual the certification of an EIR for the TFF project, or the granting of any project approvals, requiring lawsuits and any appeals to be resolved, to the extent feasible, within 270 business days of certification of the record of proceedings (which must occur within five days of the lead agency filing the notice of determination on the project).
- Establishes special procedures for the preparation and certification of the record of proceedings for the TTF project including, among others, that the lead agency prepare the record of proceedings concurrently with the administrative process, all documents in the record be posted on the lead agency’s internet website, the lead agency make the draft EIR and documents relied on in the preparation of the EIR public, and any dispute arising from the record of proceedings be resolved by the superior court.
- Establishes special procedures for public participation in CEQA review of the TTF project including, among others, that the project EIR include a specified notice, the lead agency conducts an informational workshop, the lead agency and project proponent participate in nonbinding mediation with parties that submits comments and request mediation, and the lead agency is permitted to ignore written comments submitted after the close of the public comment period.
- Subjects the TTF project and TOD projects to specified labor requirements.
Background
- Overview of CEQA Process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an environmental impact report (EIR).
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project.
- CEQA and NEPA. NEPA is the federal equivalent of CEQA. If the project involves a “major federal action” with significant impacts, an EIS under NEPA may be required. Sometimes a joint EIR/EIS can be used to satisfy the requirements of both CEQA and NEPA.
When a project is subject to CEQA and NEPA, local and state agencies are encouraged to cooperate with federal agencies through joint planning processes, joint research and studies, joint public hearings, and joint environmental documents. CEQA allows a lead agency to use a federal document in the place of an EIR or ND if it believes that the federal document meets CEQA requirements.
- Streamlined administrative review. CEQA provides for streamlined processes for preparing EIRs and other CEQA documents that enable public agencies to use various special types of EIRs to simplify preparation and avoid duplication. These various documents include “program” EIRs for a series of related actions that can be collectively characterized as a single project, “staged” EIRs for sequential projects, and “master” EIRs for community-level projects.
CEQA also provides for “tiering”—the process of analyzing general projects in a broad EIR, followed by focused review of subsequent environmental projects that are narrower in scope, thereby allowing an agency to defer analysis of certain details of later phases of long-term linked or complex projects until those phases are up for approval.
- AB 900 projects. In addition to the above-described streamlining provisions, existing law provides a framework for expediting CEQA review of major projects. AB 900 (Buchanan, Ch. 354, Stats. 2011), the Jobs and Economic Improvement Through Environmental Leadership Act of 2011, established specified administrative and judicial review procedures for the review of the environmental review documents and public agency approvals granted for designated residential, retail, commercial, sports, cultural, entertainment, or recreational use projects. To qualify, the project must meet specified objective environmental standards. The Legislature has also applied similar expedited frameworks for specific sports stadiums that meet certain objective environmental standards.
- AB 900 lawsuits. Of the projects that have been subject to AB 900, or similar expedited judicial review, four projects have been challenged under CEQA: (1) the Sacramento Kings Arena (Adriana Gianturco Saltonstall et al. v. City of Sacramento), (2) the Golden State Warriors Arena (Mission Bay Alliance et al. v. Office of Community Investment and Infrastructure and a separate non-CEQA lawsuit), (3) 8150 Sunset Boulevard Mixed Use Development which had 4 CEQA challenges to the project (Los Angeles Conservancy v. City of Los Angeles; Fix the City, Inc. v. City of Los Angeles; JDR Crescent v. City of Los Angeles; and Manners v. City of Los Angeles), and (4) the Los Angeles Clippers Arena (Saulo Eber Chan; MSG Forum, LLC v. Gavin C. Newsom; Joint Legislative Budget Committee). The first three challenges have demonstrated that expedited judicial review does not always guarantee a 270 day timeframe and cases can take longer to resolve due to, among other reasons, (1) ambiguity if the 270 days applies to business days or calendar days and if it includes appeals to the Supreme Court, (2) non-CEQA related actions which are not subject to the 270 day timeframe that are filed in addition to CEQA actions, or (3) consolidation of many, and sometimes complicated, actions. The fourth action, against the Los Angeles Clippers Arena, is still pending.
Comments
- Purpose of Bill. According to the author, “For decades, the San Diego region has explored ways to provide better connectivity to San Diego International Airport, the busiest single-runway airport in the nation. The airport anticipates an increase of 16 million annual passengers by 2050, which would result in a total of 40 million passengers annually. The projected increase in airport passengers is expected to exceed the capacity of current airport roadway connections. Due to the anticipated future growth combined with limited ground transit access to the airport, SANDAG, in partnership with the City of San Diego, the Port of San Diego, and the San Diego County Regional Airport Authority, has made it a chief priority to identify a solution for a direct transit connection to the airport. Optimally positioned near the airport, the OTC presents great potential to provide an enduring solution to the region’s longstanding challenge of airport connectivity and is one of several sites being considered for development of a Central Mobility Hub.
“On September 19, 2019, SANDAG and the Navy signed an initial agreement to explore options for redevelopment of the OTC. On January 23 of this year, SANDAG signed the Navy OTC Revitalization Agreement, which lays out a timeline for the Navy and SANDAG to explore the redevelopment of the OTC site to include a Central Mobility Hub. On January 24, the Navy began an environmental analysis of the intended revitalization project in accordance with NEPA. This analysis will enable the Navy to prepare an EIS outlining potential environmental impacts associated with the project. SANDAG will cooperate with the Navy to supplement this environmental analysis to be technically sufficient under the California Environmental Quality Act (CEQA.) SANDAG has committed $50 million in funding for continued Central Mobility Hub analysis, which includes environmental analysis, preliminary engineering, and complete corridor planning.
“As proposed to be amended, AB 2731 will strengthen environmental mitigation efforts for both the redevelopment of the NAVWAR facilities and the Central Mobility Hub and will enhance public participation and government transparency while providing certainty of process to allow both projects to begin construction in relatively short order. In light of the COVID-19 pandemic, this project, and the resulting public comment that will follow, will be essential to San Diego’s economic recovery.”
- Project tiering for TOD projects. AB 2731 permits the EIS, which is being prepared by the Navy, to be used as an EIR if the EIS complies with CEQA. Additionally, AB 2731 allows a TOD project to use that EIS as a program EIR, a process which is also consistent with existing CEQA streamlining provisions, if that TOD project meets certain criteria. To be eligible for tiering, the TOD must (1) implement and be consistent with land use standards approved by the Navy and SANDAG for the OTC site and the site plan for which an EIR has been certified before December 31, 2022, and (2) be consistent with the general use designation, density, building intensity, and applicable policies specified in the OTC site in either a SCS or APS that would achieve the GHG emission reduction targets. Neither of these documents have been approved or accepted yet.
Without having an approved site plan or SCS to refer to, it is difficult to know the exact type of project being streamlined. However, AB 2731 also requires, further environmental review of a TOD project if there are substantial changes or new information becomes available.
- Guaranteed Time Frames. Current law requires the courts to give CEQA-related cases preference over “all other civil actions… so that the action or proceeding shall be quickly heard and determined” (PRC §21167.1). In addition to this existing mandate, AB 2731 requires the courts, to the extent feasible, to complete the judicial review process for the TTF project within 270 business days. Such mandates on a court delay access for other, unknown cases such as medical malpractice suits, wrongful death suits, or contract disputes, as well as potentially exacerbating a court’s backlog on civil documents such as filing a new civil complaint, processing answers and cross complaints, or processing a demurrer or summary judgement. Calendar preferences and guaranteed time frames create additional demands and burdens on courts that have very limited resources and a never-ending supply of cases to hear.
- Why the rush? According to the bill’s sponsors, SANDAG, the need for this legislation is a timing issue. The bill’s sponsor is trying to take advantage of an opportunity to develop what would otherwise be federally-owned land and subject to NEPA. In exchange for SANDAG financing the revitalization of the NAVWAR facilities, the Navy will transfer to SANDAG what remains of the 70.5 acre site for development of TOD projects and the TTF project. The Navy will be able to proceed under normal NEPA requirements for the revitalization of its NAVWAR facilities should an agreement not be finalized between the Navy and SANDAG.
While there is nothing that would prevent the Navy and SANDAG from partnering in future years for the development of the OTC site, the sponsors feel that this is a unique opportunity for both the Navy and the City of San Diego to benefit.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 8/27/20)
City of San Diego (co-source)
San Diego Association of Governments (co-source)
Navy Region Southwest
San Diego Military Advisory Council
San Diego Regional Chamber of Commerce
OPPOSITION: (Verified 8/27/20)
California Judges Association
Plumbing-Heating-Cooling Contractors Association of California
Western Electrical Contractors Association
ASSEMBLY FLOOR: 77-0, 6/10/20
AYES: Aguiar-Curry, Arambula, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Megan Dahle, Daly, Diep, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Mullin, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Petrie-Norris, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Voepel, Waldron, Weber, Wicks, Wood, Rendon
NO VOTE RECORDED: Eggman, Quirk
Prepared by: Genevieve M. Wong / E.Q. / (916) 651-4108
8/28/20 13:18:48
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 2731 |
THIRD READING
Bill No: AB 2731
Author: Gloria (D), et al.
Amended: 8/25/20 in Senate
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 5-0, 8/14/20
AYES: Allen, Hill, Skinner, Stern, Wieckowski
NO VOTE RECORDED: Bates, Dahle
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 77-0, 6/10/20 (Consent) - See last page for vote
SUBJECT: California Environmental Quality Act: City of San Diego: Old Town Center redevelopment
SOURCE: City of San Diego
San Diego Association of Governments
DIGEST:
This bill provides that a specific environmental impact statement satisfies the requirements of the California Environmental Quality Act (CEQA) for a transit-oriented development project, within the Old Town Center site of San Diego; and creates special administrative and judicial review procedures for a specific transit and transportation facilities project, also located within the Old Town Center site, that requires the courts, to the extent feasible, to resolve specific CEQA actions against the project within 270 days.
Senate Floor Amendments of 8/25/20 make various technical changes to specified labor requirements that a project must meet to be eligible for this bill’s proposed CEQA streamlining; and make other technical, but nominally substantive changes.
ANALYSIS:
Existing law:
- Requires federal agencies, under the National Environmental Protection Act (NEPA), to assess the environmental effects of their proposed actions prior to making decisions. Actions include making decisions on permit applications, adopting federal land management actions, and constructing highways and other publicly-owned facilities. (42 United States Code §4321 et seq.)
- Provides for the following, under CEQA:
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration, mitigated declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines). (Public Resources Code (PRC) §21000 et seq.)
- Sets requirements relating to the preparation, review, comment, approval and certification of environmental documents, as well as procedures relating to an action or proceeding to attack, review, set aside, void, or annul various actions of a public agency on the grounds of noncompliance with CEQA. (PRC §21165 et seq.)
This bill:
- Provides that the requirements of CEQA satisfied by a specific Environmental Impact Statement (EIS) for a transit-oriented development (TOD) project, as defined by the bill, that:
- Is proposed within a transit priority area;
- Is undertaken to implement and is consistent with the land use standards approved by the Navy and San Diego Association of Governments (SANDAG) for the Old Town Center (OTC) site and the site plan for which an EIR has been certified on or before December 31, 2022, and the site plan meets a vehicle miles traveled reduction of 25% below the regional average vehicle miles traveled identified in a sustainable communities strategy (SCS) or alternative planning strategy (APS);
- Is consistent with the general use designation, density, building intensity, and applicable policies specified in the OTC site in either a SCS or APS for which the State Air Resources Board (ARB) has accepted SANDAG’s determination that the SCS or the APS would achieve the greenhouse gas emissions reduction targets; and
- Complies with certain labor requirements specified by the bill.
- Requires further environmental review of such projects, only, if:
- Substantial changes are proposed which will require major revisions to the EIR.
- Substantial changes occur with respect to the circumstances under which the project is being undertaken will require major revisions in the EIR.
- New information, which was not known and could not have been known at the time the EIR was certified, becomes available.
- Defines “transit and transportation facilities” (TFF) to mean a multimodal regional transportation facility, including a central mobility hub located in the Old Town Center site and transportation linkages that connect the central mobility hub to the regional transportation system and that connect the central mobility hub to the San Diego International Airport.
- Subjects a TTF project to certain environmental standards including that any facility that is part of the project obtains Leadership in Energy and Environmental Design gold certification for new construction within one year of project completion, that the project does not result in any net additional emission of greenhouse gases, that the project has a transportation demand management program, and the project achieves at least 25% reduction in vehicle miles traveled as compared to the regional average vehicle miles traveled identified in a sustainable communities strategy or alternative planning strategy.
- Requires Judicial Council, by January 1, 2022, to amend certain California Rules of Court that would apply to an action or proceeding brought to attack, review, set aside, void, or annual the certification of an EIR for the TFF project, or the granting of any project approvals, requiring lawsuits and any appeals to be resolved, to the extent feasible, within 270 business days of certification of the record of proceedings (which must occur within five days of the lead agency filing the notice of determination on the project).
- Establishes special procedures for the preparation and certification of the record of proceedings for the TTF project including, among others, that the lead agency prepare the record of proceedings concurrently with the administrative process, all documents in the record be posted on the lead agency’s internet website, the lead agency make the draft EIR and documents relied on in the preparation of the EIR public, and any dispute arising from the record of proceedings be resolved by the superior court.
- Establishes special procedures for public participation in CEQA review of the TTF project including, among others, that the project EIR include a specified notice, the lead agency conducts an informational workshop, the lead agency and project proponent participate in nonbinding mediation with parties that submits comments and request mediation, and the lead agency is permitted to ignore written comments submitted after the close of the public comment period.
- Subjects the TTF project and TOD projects to specified labor requirements.
Background
- Overview of CEQA Process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an environmental impact report (EIR).
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project.
- CEQA and NEPA. NEPA is the federal equivalent of CEQA. If the project involves a “major federal action” with significant impacts, an EIS under NEPA may be required. Sometimes a joint EIR/EIS can be used to satisfy the requirements of both CEQA and NEPA.
When a project is subject to CEQA and NEPA, local and state agencies are encouraged to cooperate with federal agencies through joint planning processes, joint research and studies, joint public hearings, and joint environmental documents. CEQA allows a lead agency to use a federal document in the place of an EIR or ND if it believes that the federal document meets CEQA requirements.
- Streamlined administrative review. CEQA provides for streamlined processes for preparing EIRs and other CEQA documents that enable public agencies to use various special types of EIRs to simplify preparation and avoid duplication. These various documents include “program” EIRs for a series of related actions that can be collectively characterized as a single project, “staged” EIRs for sequential projects, and “master” EIRs for community-level projects.
CEQA also provides for “tiering”—the process of analyzing general projects in a broad EIR, followed by focused review of subsequent environmental projects that are narrower in scope, thereby allowing an agency to defer analysis of certain details of later phases of long-term linked or complex projects until those phases are up for approval.
- AB 900 projects. In addition to the above-described streamlining provisions, existing law provides a framework for expediting CEQA review of major projects. AB 900 (Buchanan, Ch. 354, Stats. 2011), the Jobs and Economic Improvement Through Environmental Leadership Act of 2011, established specified administrative and judicial review procedures for the review of the environmental review documents and public agency approvals granted for designated residential, retail, commercial, sports, cultural, entertainment, or recreational use projects. To qualify, the project must meet specified objective environmental standards. The Legislature has also applied similar expedited frameworks for specific sports stadiums that meet certain objective environmental standards.
- AB 900 lawsuits. Of the projects that have been subject to AB 900, or similar expedited judicial review, four projects have been challenged under CEQA: (1) the Sacramento Kings Arena (Adriana Gianturco Saltonstall et al. v. City of Sacramento), (2) the Golden State Warriors Arena (Mission Bay Alliance et al. v. Office of Community Investment and Infrastructure and a separate non-CEQA lawsuit), (3) 8150 Sunset Boulevard Mixed Use Development which had 4 CEQA challenges to the project (Los Angeles Conservancy v. City of Los Angeles; Fix the City, Inc. v. City of Los Angeles; JDR Crescent v. City of Los Angeles; and Manners v. City of Los Angeles), and (4) the Los Angeles Clippers Arena (Saulo Eber Chan; MSG Forum, LLC v. Gavin C. Newsom; Joint Legislative Budget Committee). The first three challenges have demonstrated that expedited judicial review does not always guarantee a 270 day timeframe and cases can take longer to resolve due to, among other reasons, (1) ambiguity if the 270 days applies to business days or calendar days and if it includes appeals to the Supreme Court, (2) non-CEQA related actions which are not subject to the 270 day timeframe that are filed in addition to CEQA actions, or (3) consolidation of many, and sometimes complicated, actions. The fourth action, against the Los Angeles Clippers Arena, is still pending.
Comments
- Purpose of Bill. According to the author, “For decades, the San Diego region has explored ways to provide better connectivity to San Diego International Airport, the busiest single-runway airport in the nation. The airport anticipates an increase of 16 million annual passengers by 2050, which would result in a total of 40 million passengers annually. The projected increase in airport passengers is expected to exceed the capacity of current airport roadway connections. Due to the anticipated future growth combined with limited ground transit access to the airport, SANDAG, in partnership with the City of San Diego, the Port of San Diego, and the San Diego County Regional Airport Authority, has made it a chief priority to identify a solution for a direct transit connection to the airport. Optimally positioned near the airport, the OTC presents great potential to provide an enduring solution to the region’s longstanding challenge of airport connectivity and is one of several sites being considered for development of a Central Mobility Hub.
“On September 19, 2019, SANDAG and the Navy signed an initial agreement to explore options for redevelopment of the OTC. On January 23 of this year, SANDAG signed the Navy OTC Revitalization Agreement, which lays out a timeline for the Navy and SANDAG to explore the redevelopment of the OTC site to include a Central Mobility Hub. On January 24, the Navy began an environmental analysis of the intended revitalization project in accordance with NEPA. This analysis will enable the Navy to prepare an EIS outlining potential environmental impacts associated with the project. SANDAG will cooperate with the Navy to supplement this environmental analysis to be technically sufficient under the California Environmental Quality Act (CEQA.) SANDAG has committed $50 million in funding for continued Central Mobility Hub analysis, which includes environmental analysis, preliminary engineering, and complete corridor planning.
“As proposed to be amended, AB 2731 will strengthen environmental mitigation efforts for both the redevelopment of the NAVWAR facilities and the Central Mobility Hub and will enhance public participation and government transparency while providing certainty of process to allow both projects to begin construction in relatively short order. In light of the COVID-19 pandemic, this project, and the resulting public comment that will follow, will be essential to San Diego’s economic recovery.”
- Project tiering for TOD projects. AB 2731 permits the EIS, which is being prepared by the Navy, to be used as an EIR if the EIS complies with CEQA. Additionally, AB 2731 allows a TOD project to use that EIS as a program EIR, a process which is also consistent with existing CEQA streamlining provisions, if that TOD project meets certain criteria. To be eligible for tiering, the TOD must (1) implement and be consistent with land use standards approved by the Navy and SANDAG for the OTC site and the site plan for which an EIR has been certified before December 31, 2022, and (2) be consistent with the general use designation, density, building intensity, and applicable policies specified in the OTC site in either a SCS or APS that would achieve the GHG emission reduction targets. Neither of these documents have been approved or accepted yet.
Without having an approved site plan or SCS to refer to, it is difficult to know the exact type of project being streamlined. However, AB 2731 also requires, further environmental review of a TOD project if there are substantial changes or new information becomes available.
- Guaranteed Time Frames. Current law requires the courts to give CEQA-related cases preference over “all other civil actions… so that the action or proceeding shall be quickly heard and determined” (PRC §21167.1). In addition to this existing mandate, AB 2731 requires the courts, to the extent feasible, to complete the judicial review process for the TTF project within 270 business days. Such mandates on a court delay access for other, unknown cases such as medical malpractice suits, wrongful death suits, or contract disputes, as well as potentially exacerbating a court’s backlog on civil documents such as filing a new civil complaint, processing answers and cross complaints, or processing a demurrer or summary judgement. Calendar preferences and guaranteed time frames create additional demands and burdens on courts that have very limited resources and a never-ending supply of cases to hear.
- Why the rush? According to the bill’s sponsors, SANDAG, the need for this legislation is a timing issue. The bill’s sponsor is trying to take advantage of an opportunity to develop what would otherwise be federally-owned land and subject to NEPA. In exchange for SANDAG financing the revitalization of the NAVWAR facilities, the Navy will transfer to SANDAG what remains of the 70.5 acre site for development of TOD projects and the TTF project. The Navy will be able to proceed under normal NEPA requirements for the revitalization of its NAVWAR facilities should an agreement not be finalized between the Navy and SANDAG.
While there is nothing that would prevent the Navy and SANDAG from partnering in future years for the development of the OTC site, the sponsors feel that this is a unique opportunity for both the Navy and the City of San Diego to benefit.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 8/26/20)
City of San Diego (co-source)
San Diego Association of Governments (co-source)
Navy Region Southwest
San Diego Military Advisory Council
San Diego Regional Chamber of Commerce
OPPOSITION: (Verified 8/26/20)
California Judges Association
Plumbing-Heating-Cooling Contractors Association of California
Sierra Club
Western Electrical Contractors Association
ASSEMBLY FLOOR: 77-0, 6/10/20
AYES: Aguiar-Curry, Arambula, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Megan Dahle, Daly, Diep, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Mullin, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Petrie-Norris, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Voepel, Waldron, Weber, Wicks, Wood, Rendon
NO VOTE RECORDED: Eggman, Quirk
Prepared by: Genevieve M. Wong / E.Q. / (916) 651-4108
8/26/20 15:03:03
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 2731 |
THIRD READING
Bill No: AB 2731
Author: Gloria (D), et al.
Amended: 8/17/20 in Senate
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 5-0, 8/14/20
AYES: Allen, Hill, Skinner, Stern, Wieckowski
NO VOTE RECORDED: Bates, Dahle
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 77-0, 6/10/20 (Consent) - See last page for vote
SUBJECT: California Environmental Quality Act: City of San Diego: Old Town Center redevelopment
SOURCE: City of San Diego
San Diego Association of Governments
DIGEST:
This bill deems a specific environmental impact statement to meet the requirements of the California Environmental Quality Act (CEQA) for a transit-oriented development project, within the Old Town Center site of San Diego; and creates special administrative and judicial review procedures for a specific transit and transportation facilities project, also located within the Old Town Center site, that requires the courts, to the extent feasible, to resolve specific CEQA actions against the project within 270 days.
ANALYSIS:
Existing law:
- Requires federal agencies, under the National Environmental Protection Act (NEPA), to assess the environmental effects of their proposed actions prior to making decisions. Actions include making decisions on permit applications, adopting federal land management actions, and constructing highways and other publicly-owned facilities. (42 United States Code §4321 et seq.)
- Provides for the following, under CEQA:
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration, mitigated declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines). (Public Resources Code (PRC) §21000 et seq.)
- Sets requirements relating to the preparation, review, comment, approval and certification of environmental documents, as well as procedures relating to an action or proceeding to attack, review, set aside, void, or annul various actions of a public agency on the grounds of noncompliance with CEQA. (PRC §21165 et seq.)
This bill:
- Deems the requirements of CEQA satisfied by a specific Environmental Impact Statement (EIS) for a transit-oriented development (TOD) project, as defined by the bill, that:
- Is proposed within a transit priority area;
- Is undertaken to implement and is consistent with the land use standards approved by the Navy and San Diego Association of Governments (SANDAG) for the Old Town Center (OTC) site and the site plan for which an EIR has been certified on or before December 31, 2021, and the site plan meets a vehicle miles traveled reduction of 25% below the regional average vehicle miles traveled identified in a sustainable communities strategy (SCS) or alternative planning strategy (APS);
- Is consistent with the general use designation, density, building intensity, and applicable policies specified in the OTC site in either a SCS or APS for which the State Air Resources Board (ARB) has accepted SANDAG’s determination that the SCS or the APS would achieve the greenhouse gas emissions reduction targets; and
- Complies with certain labor requirements specified by the bill.
- Requires further environmental review of such projects, only, if:
- Substantial changes are proposed which will require major revisions to the EIR.
- Substantial changes occur with respect to the circumstances under which the project is being undertaken while will require major revisions in the EIR.
- New information, which was not known and could not have been known at the time the EIR was certified, becomes available.
- Defines “transit and transportation facilities” (TFF) to mean a multimodal regional transportation facility, including a central mobility hub located in the Old Town Center site and transportation linkages that connect the central mobility hub to the regional transportation system and that connect the central mobility hub to the San Diego International Airport.
- Subjects a TTF project to certain environmental standards including that any facility that is part of the project obtains Leadership in Energy and Environmental Design gold certification for new construction within one year of project completion, that the project does not result in any net additional emission of greenhouse gases, that the project has a transportation demand management program, and the project achieves at least 25% reduction in vehicle miles traveled as compared to the regional average vehicle miles traveled identified in a sustainable communities strategy or alternative planning strategy.
- Requires Judicial Council, by January 1, 2022, to amend certain California Rules of Court that would apply to an action or proceeding brought to attack, review, set aside, void, or annual the certification of an EIR for the TFF project, or the granting of any project approvals, requiring lawsuits and any appeals to be resolved, to the extent feasible, within 270 business days of certification of the record of proceedings (which must occur within five days of the lead agency filing the notice of determination on the project).
- Establishes special procedures for the preparation and certification of the record of proceedings for the TTF project including, among others, that the lead agency prepare the record of proceedings concurrently with the administrative process, all documents in the record be posted on the lead agency’s internet website, the lead agency make the draft EIR and documents relied on in the preparation of the EIR public, and any dispute arising from the record of proceedings be resolved by the superior court.
- Establishes special procedures for public participation in CEQA review of the TTF project including, among others, that the project EIR include a specified notice, the lead agency conducts an informational workshop, the lead agency and applicant participate in nonbinding mediation with parties that submits comments and request mediation, and the lead agency is permitted to ignore written comments submitted after the close of the public comment period.
- Subjects the TTF project and TOD projects to specified labor requirements.
Background
- Overview of CEQA Process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an environmental impact report (EIR).
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project.
- CEQA and NEPA. NEPA is the federal equivalent of CEQA. If the project involves a “major federal action” with significant impacts, an EIS under NEPA may be required. Sometimes a joint EIR/EIS can be used to satisfy the requirements of both CEQA and NEPA.
When a project is subject to CEQA and NEPA, local and state agencies are encouraged to cooperate with federal agencies through joint planning processes, joint research and studies, joint public hearings, and joint environmental documents. CEQA allows a lead agency to use a federal document in the place of an EIR or ND if it believes that the federal document meets CEQA requirements.
- Streamlined administrative review. CEQA provides for streamlined processes for preparing EIRs and other CEQA documents that enable public agencies to use various special types of EIRs to simplify preparation and avoid duplication. These various documents include “program” EIRs for a series of related actions that can be collectively characterized as a single project, “staged” EIRs for sequential projects, and “master” EIRs for community-level projects.
CEQA also provides for “tiering”—the process of analyzing general projects in a broad EIR, followed by focused review of subsequent environmental projects that are narrower in scope, thereby allowing an agency to defer analysis of certain details of later phases of long-term linked or complex projects until those phases are up for approval.”
- AB 900 projects. In addition to the above-described streamlining provisions, existing law provides a framework for expediting CEQA review of major projects. AB 900 (Buchanan, Ch. 354, Stats. 2011), the Jobs and Economic Improvement Through Environmental Leadership Act of 2011, established specified administrative and judicial review procedures for the review of the environmental review documents and public agency approvals granted for designated residential, retail, commercial, sports, cultural, entertainment, or recreational use projects. To qualify, the project must meet specified objective environmental standards. The Legislature has also applied similar expedited frameworks for specific sports stadiums that meet certain objective environmental standards.
- AB 900 lawsuits. Of the projects that have been subject to AB 900, or similar expedited judicial review, four projects have been challenged under CEQA: (1) the Sacramento Kings Arena (Adriana Gianturco Saltonstall et al. v. City of Sacramento), (2) the Golden State Warriors Arena (Mission Bay Alliance et al. v. Office of Community Investment and Infrastructure and a separate non-CEQA lawsuit), (3) 8150 Sunset Boulevard Mixed Use Development which had 4 CEQA challenges to the project (Los Angeles Conservancy v. City of Los Angeles; Fix the City, Inc. v. City of Los Angeles; JDR Crescent v. City of Los Angeles; and Manners v. City of Los Angeles), and (4) the Los Angeles Clippers Arena (Saulo Eber Chan; MSG Forum, LLC v. Gavin C. Newsom; Joint Legislative Budget Committee). The first three challenges have demonstrated that expedited judicial review does not always guarantee a 270 day timeframe and cases can take longer to resolve due to, among other reasons, (1) ambiguity if the 270 days applies to business days or calendar days and if it includes appeals to the Supreme Court, (2) non-CEQA related actions which are not subject to the 270 day timeframe that are filed in addition to CEQA actions, or (3) consolidation of many, and sometimes complicated, actions. The fourth action, against the Los Angeles Clippers Arena, is still pending.
Comments
- Purpose of Bill. According to the author, “For decades, the San Diego region has explored ways to provide better connectivity to San Diego International Airport, the busiest single-runway airport in the nation. The airport anticipates an increase of 16 million annual passengers by 2050, which would result in a total of 40 million passengers annually. The projected increase in airport passengers is expected to exceed the capacity of current airport roadway connections. Due to the anticipated future growth combined with limited ground transit access to the airport, SANDAG, in partnership with the City of San Diego, the Port of San Diego, and the San Diego County Regional Airport Authority, has made it a chief priority to identify a solution for a direct transit connection to the airport. Optimally positioned near the airport, the OTC presents great potential to provide an enduring solution to the region’s longstanding challenge of airport connectivity and is one of several sites being considered for development of a Central Mobility Hub.
“On September 19, 2019, SANDAG and the Navy signed an initial agreement to explore options for redevelopment of the OTC. On January 23 of this year, SANDAG signed the Navy OTC Revitalization Agreement, which lays out a timeline for the Navy and SANDAG to explore the redevelopment of the OTC site to include a Central Mobility Hub. On January 24, the Navy began an environmental analysis of the intended revitalization project in accordance with NEPA. This analysis will enable the Navy to prepare an EIS outlining potential environmental impacts associated with the project. SANDAG will cooperate with the Navy to supplement this environmental analysis to be technically sufficient under the California Environmental Quality Act (CEQA.) SANDAG has committed $50 million in funding for continued Central Mobility Hub analysis, which includes environmental analysis, preliminary engineering, and complete corridor planning.
“As proposed to be amended, AB 2731 will strengthen environmental mitigation efforts for both the redevelopment of the NAVWAR facilities and the Central Mobility Hub and will enhance public participation and government transparency while providing certainty of process to allow both projects to begin construction in relatively short order. In light of the COVID-19 pandemic, this project, and the resulting public comment that will follow, will be essential to San Diego’s economic recovery.”
- Project tiering for TOD projects. AB 2731 permits the EIS, which is being prepared by the Navy, to be used as an EIR if the EIS complies with CEQA. Additionally, AB 2731 allows a TOD project to tier off of that EIS, a process which is also consistent with existing CEQA streamlining provisions, if that TOD project meets certain criteria. To be eligible for tiering, the TOD must (1) implement and be consistent with land use standards approved by the Navy and SANDAG for the OTC site and the site plan for which an EIR was been certified before December 31, 2021, and (2) be consistent with the general use designation, density, building intensity, and applicable policies specified in the OTC site in either a SCS or APS that would achieve the GHG emission reduction targets. Neither of these documents have been approved or accepted yet.
Without having an approved site plan or SCS to refer to, it is difficult to know the exact type of project being streamlined. However, AB 2731 also requires, further environmental review of a TOD project if there are substantial changes or new information becomes available.
- Guaranteed Time Frames. Current law requires the courts to give CEQA-related cases preference over “all other civil actions… so that the action or proceeding shall be quickly heard and determined” (PRC §21167.1). In addition to this existing mandate, AB 2731 requires the courts, to the extent feasible, to complete the judicial review process for the TTF project within 270 business days. Such mandates on a court delay access for other, unknown cases such as medical malpractice suits, wrongful death suits, or contract disputes, as well as potentially exacerbating a court’s backlog on civil documents such as filing a new civil complaint, processing answers and cross complaints, or processing a demurrer or summary judgement. Calendar preferences and guaranteed time frames create additional demands and burdens on courts that have very limited resources and a never-ending supply of cases to hear.
- Why the rush? According to the bill’s sponsors, SANDAG, the need for this legislation is a timing issue. The bill’s sponsor is trying to take advantage of an opportunity to develop what would otherwise be federally-owned land and subject to NEPA. In exchange for SANDAG financing the revitalization of the NAVWAR facilities, the Navy will transfer to SANDAG what remains of the 70.5 acre site for development of TOD projects and the TTF project. The Navy will be able to proceed under normal NEPA requirements for the revitalization of its NAVWAR facilities should an agreement not be finalized between the Navy and SANDAG.
While there is nothing that would prevent the Navy and SANDAG from partnering in future years for the development of the OTC site, the sponsors feel that this is a unique opportunity for both the Navy and the City of San Diego to benefit.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 8/20/20)
City of San Diego (co-source)
San Diego Association of Governments (co-source)
Navy Region Southwest
San Diego Military Advisory Council
San Diego Regional Chamber of Commerce
OPPOSITION: (Verified 8/20/20)
California Judges Association
Plumbing-Heating-Cooling Contractors Association of California
Sierra Club
Western Electrical Contractors Association
ASSEMBLY FLOOR: 77-0, 6/10/20
AYES: Aguiar-Curry, Arambula, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Megan Dahle, Daly, Diep, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Mullin, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Petrie-Norris, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Voepel, Waldron, Weber, Wicks, Wood, Rendon
NO VOTE RECORDED: Eggman, Quirk
Prepared by: Genevieve M. Wong / E.Q. / (916) 651-4108
8/22/20 11:57:45
**** END ****
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Allen, Chair
2019 - 2020 Regular
Bill No: AB 2731
Author: | Gloria | ||
Version: | 8/3/2020 | Hearing Date: | 8/14/2020 |
Urgency: | No | Fiscal: | Yes |
Consultant: | Genevieve M. Wong | ||
SUBJECT: California Environmental Quality Act: City of San Diego: Old Town Center redevelopment
DIGEST: Deems a specific environmental impact statement to meet the requirements of CEQA for a transit-oriented development project, including a residential, employment-center, or mixed-use development project, within the Old Town Center site of San Diego; and creates special administrative and judicial review procedures for a specific transit and transportation facilities project, also located within the Old Town Center site, that would require the courts, to the extent feasible, to resolve specific CEQA actions against the project within 270 days.
ANALYSIS:
Existing law:
- Under the National Environmental Protection Act (NEPA), requires federal agencies to assess the environmental effects of their proposed actions prior to making decisions. Actions include making decisions on permit applications, adopting federal land management actions, and constructing highways and other publicly-owned facilities. (42 United States Code §4321 et seq.)
- Under the California Environmental Quality Act (CEQA),
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration, mitigated declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines). (Public Resources Code (PRC) §21000 et seq.)
- Requires, if a project requires both an EIR and an environmental impact statement (EIS), the lead agency to use the EIS as the EIR, as specified. Requires the lead agency to consult with the federal agency that is required to prepare the EIS and to notify that federal agency of any scoping meeting for the proposed project. (PRC §21083.7)
- Sets requirements relating to the preparation, review, comment, approval and certification of environmental documents, as well as procedures relating to an action or proceeding to attack, review, set aside, void, or annul various actions of a public agency on the grounds of noncompliance with CEQA. (PRC §§21165 et seq.)
- Requires courts to give CEQA-related actions or proceedings preference over all other civil actions so that the action or proceeding is quickly heard and determined. (PRC §21167.1)
- Requires courts to give CEQA-related actions or proceedings preference over all other civil actions so that the action or proceeding is quickly heard and determined. (PRC §21167.1)
- Establishes the Jobs and Economic Improvement Through Environmental Leadership Act of 2011 (AB 900, Buchanan, Gordon, Chapter 354, Statutes of 2011), which establishes CEQA administrative and judicial review procedures for an "environmental leadership" project. (PRC §21178 et seq.)
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration, mitigated declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines). (Public Resources Code (PRC) §21000 et seq.)
This bill:
- Establishes findings related to the Naval Base Point Loma’s Old Town Center (OTC) and the City of San Diego.
- Defines the following terms:
- “Old Town Center site” to mean the approximately 70.5 acres comprising the Naval Base Point Loma’s OTC.
- “Transit-oriented development project” to mean a project for the redevelopment of the OTC site that substantially conforms to the description of the proposed action for the Navy Old Town Campus Revitalization at Naval Base Point Loma, California, set forth in a specific notice of intent to prepare an environmental impact statement.
- “Transit and transportation facilities” to mean a multimodal regional transportation facility, including a central mobility hub located in the Old Town Center site and transportation linkages that connect the central mobility hub to the regional transportation system and that connect the central mobility hub to the San Diego International Airport. Provides that a transit and transportation facility does not include a transit station or hub that is located outside of the Old Town Center site.
- Subjects a transit and transportation facilities project to certain environmental standards including that any facility that is part of the project obtains Leadership in Energy and Environmental Design gold certification for new construction within one year of project completion, that the project does not result in any net additional emission of greenhouse gases, that the project has a transportation demand management program, and the project achieves at least 25% reduction in vehicle miles traveled as compared to the regional average vehicle miles traveled identified in a sustainable communities strategy or alternative planning strategy.
- Subjects a transit and transportation facilities project to certain environmental standards including that any facility that is part of the project obtains Leadership in Energy and Environmental Design gold certification for new construction within one year of project completion, that the project does not result in any net additional emission of greenhouse gases, that the project has a transportation demand management program, and the project achieves at least 25% reduction in vehicle miles traveled as compared to the regional average vehicle miles traveled identified in a sustainable communities strategy or alternative planning strategy.
- “Old Town Center site” to mean the approximately 70.5 acres comprising the Naval Base Point Loma’s OTC.
- Deems the requirements of CEQA satisfied by a specific environmental impact statement prepared by the Navy for a TOD project that:
- Is proposed within a transit priority area;
- Is undertaken to implement and is consistent with the land use standards approved by the Navy and San Diego Association of Governments (SANDAG) for the OTC site and the site plan for which an EIR has been certified on or before December 31, 2021, and the site plan meets a vehicle miles traveled reduction of 25% below the regional average vehicle miles traveled identified in a sustainable communities strategy (SCS) or alternative planning strategy (APS);
- Is consistent with the general use designation, density, building intensity, and applicable policies specified in the OTC site in either a SCS or APS for which the State Air Resources Board (ARB) has accepted SANDAG’s determination that the SCS or the APS would achieve the greenhouse gas emissions reduction targets; and
- The project proponent certifies that the project will comply with certain labor requirements specified by the bill.
- Only requires further environmental review of such projects if any of the following occur:
- Substantial changes are proposed which will require major revisions to the EIR.
- Substantial changes occur with respect to the circumstances underwhich the project is being undertaken while will require major revisions in the EIR.
- New information, which was not known and could not have been known at the time the EIR was certified, becomes available.
- Requires Judicial Council, by June 30, 2021, to amend certain California Rules of Court that would apply to an action or proceeding brought to attack, review, set aside, void, or annual the certification of an EIR for the transit and transportation facilities (TTF) projector the granting of any project approvals, requiring lawsuits and any appeals to be resolved, to the extent feasible, within 270 business days of certification of the record of proceedings (which must occur within five days of the lead agency filing the notice of determination on the project).
- Establishes special procedures for the preparation and certification of the record of proceedings for the TTF project:
- Requires the lead agency to prepare the record of proceedings concurrently with the administrative process.
- Requires all documents and other materials placed in the record of proceedings to be posted on, and downloadable from, an internet website maintained by the lead agency.
- Requires the lead agency to make available to the public the draft EIR and all other documents submitted to, or relied on by, the lead agency in the preparation of the draft EIR.
- Requires a document prepared by the lead agency or submitted by the applicant after the release of the draft EIR that is a part of the record of proceedings to be made available to the public within five business days after the document is released or received by the lead agency.
- Requires the lead agency to encourage written comments on the project be submitted in a readily accessible electronic format, and requires the lead agency to make any comment available to the public within five days of its receipt. Requires the lead agency to convert any comment that is not in an electronic format into a readily accessible electronic format within 14 days of receipt and to make it available to the public.
- Provides that documents submitted to or relied on by the lead agency that were not prepared specifically for the project and are copyright protected are not required to be made readily accessible in an electronic format. Requires the lead agency to make an index of copyright-protected documents, as specified.
- Requires the lead agency to certify the final record of proceedings within five days after filing the notice that the agency has approved or has determined to carry out the project.
- Requires any dispute arising from the record of proceedings be resolved by the superior court. Requires a party disputing the content of the record of proceedings to file a motion to augment the record of proceedings at the time it files its initial brief.
- Requires the lead agency, if it fails to certify an EIR for the transit and transportation facilities project before January 1, 2025, to notify the Secretary of the State.
- Requires the lead agency to prepare the record of proceedings concurrently with the administrative process.
- Establishes special procedures for public participation in CEQA review of the TTF project:
- Require the project EIR to include a specified notice that the EIR is subject to the provisions of the chapter added by this bill.
- Require the lead agency to conduct an informational workshop within 10 days of release of the Draft EIR and hold a public hearing within 10 days before close of the public comment period.
- Require the lead agency and applicant to participate in nonbinding mediation with any party who submitted comments on the Draft EIR and requested mediation within 5 days of the close of the public comment period, with the cost to be paid by the applicant. Requires mediation to end within 35 days of the close of the public comment period.
- Require the lead agency to adopt any measures agreed upon in mediation. Prohibits a commenter from raising an issue addressed by that measure in a lawsuit.
- Permit the lead agency to ignore written comments submitted after the close of the public comment period, with specified exceptions for materials addressing new information released after the close of the public comment period.
- Require the lead agency to provide all EIR documents and comments in an electronic format (with the exception of certain copyright-protected documents), certify the record within 5 days of filing the notice of determination, provide the record to a party upon written request, and provide the record to the superior court within 10 days of the filing of a petition for review.
- Require the project EIR to include a specified notice that the EIR is subject to the provisions of the chapter added by this bill.
- Subjects the TTF project and TOD projects to specified labor requirements.
Background
- Overview of CEQA Process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration (ND). If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an environmental impact report (EIR).
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
- CEQA and NEPA. NEPA is the federal equivalent of CEQA. If the project involves a “major federal action” with significant impacts, an environmental impact statement (EIS) under NEPA may be required. Sometimes a joint EIR/EIS can be used to satisfy the requirements of both CEQA and NEPA.
When a project is subject to CEQA and NEPA, local and state agencies are encouraged to cooperate with federal agencies through joint planning processes, joint research and studies, joint public hearings, and joint environmental documents. CEQA allows a lead agency to use a federal document in the place of an EIR or ND if it believes that the federal document meets CEQA requirements.
- Old Town Campus Revitalization at Naval Base Point Loma. Pursuant to NEPA, the Navy is currently preparing an EIS to evaluate the potential environmental effects associated with revitalization of the OTC site at Naval Base Point Loma to support Naval Information Warfare Systems Command’s (NAVWAR) current and future operational readiness. The site is approximately 70.5-acres, upon which the Navy proposes to demolish and construct buildings, utilities, and infrastructure to provide mission capable facilities for NAVWAR. Because it is a naval facility and on federally-owned land, any development project contemplated for the OTC site would not generally be subject to CEQA and would instead be subject to NEPA.
In September 2019, the Navy entered into an agreement with SANDAG to conduct a planning process intended to lead to the redevelopment of the OTC site, which, in addition to the NAVWAR facilities, would potentially include mixed-use development and a Transit Center. If SANDAG and the Navy do not agree to move forward with the development of the site, the Navy may still proceed with revitalizing the OTC site to meet NAVWAR’s facility requirements.
- CEQA Streamlining. CEQA provides several tools to expedite the approval process of a project, including exemptions, streamlined administrative review, and streamlined judicial review.
- Streamlined administrative review. CEQA provides for streamlined processes for preparing EIRs and other CEQA documents that enable public agencies to use various special types of EIR’s to simplify preparation and avoid duplication. These various documents include “program” EIRs for a series of related actions that can be collectively characterized as a single project, “staged” EIRs for sequential projects, and “master” EIRs for community-level projects. Additionally, CEQA Guidelines section 15183(a) provides that “CEQA mandates that projects which are consistent with the development density established by existing zoning, community plan, or general plan policies for which an EIR was certified shall not require additional environmental review, except as might be necessary to examine whether there are project-specific significant effects which are peculiar to the project or its site. This streamlines the review of such projects and reduces the need to prepare repetitive studies.”
- Streamlined administrative review. CEQA provides for streamlined processes for preparing EIRs and other CEQA documents that enable public agencies to use various special types of EIR’s to simplify preparation and avoid duplication. These various documents include “program” EIRs for a series of related actions that can be collectively characterized as a single project, “staged” EIRs for sequential projects, and “master” EIRs for community-level projects. Additionally, CEQA Guidelines section 15183(a) provides that “CEQA mandates that projects which are consistent with the development density established by existing zoning, community plan, or general plan policies for which an EIR was certified shall not require additional environmental review, except as might be necessary to examine whether there are project-specific significant effects which are peculiar to the project or its site. This streamlines the review of such projects and reduces the need to prepare repetitive studies.”
CEQA also provides for “tiering”—the process of analyzing general projects in a broad EIR, followed by focused review of subsequent environmental projects that are narrower in scope, thereby allowing an agency to defer analysis of certain details of later phases of long-term linked or complex projects until those phases are up for approval.”
- Streamlined judicial review. Several provisions streamline judicial review of challenges to projects under CEQA, including:
- Streamlined judicial review. Several provisions streamline judicial review of challenges to projects under CEQA, including:
- amendments to provisions governing litigation and mediation;
- discovery is generally not allowed, as CEQA cases are generally restricted to review of the record;
- concurrent preparation of the record of proceedings to enable judicial review to occur sooner;
- counties with a population of over 200,000 must designate one or more judges to develop expertise on CEQA and hear CEQA cases;
- both the Superior Court and the Court of Appeal must give CEQA lawsuits preference over all other civil actions; and
- if feasible, the Court of Appeal must hear a CEQA appeal within one year of filing.
Many of these changes have created efficiencies in the environmental review process overall and have expedited the process for the types of projects encouraged by the state.
- AB 900 projects. In addition to the above-described streamlining provisions, existing law also provides a framework for expediting CEQA review of major projects. AB 900 (Buchanan, Ch. 354, Stats. 2011), the Jobs and Economic Improvement Through Environmental Leadership Act of 2011, established specified administrative and judicial review procedures for the review of the environmental review documents and public agency approvals granted for designated residential, retail, commercial, sports, cultural, entertainment, or recreational use projects, known as Environmental Leadership Development Projects (ELDP). To qualify as an ELDP, the project must meet specified objective environmental standards. The Legislature has also applied similar expedited frameworks for specific sports stadiums that meet certain objective environmental standards.
- AB 900 lawsuits. Of the projects that have been subject to AB 900, or similar expedited judicial review, four projects have been challenged under CEQA: (1) the Sacramento Kings Arena (Adriana Gianturco Saltonstall et al. v. City of Sacramento), (2) the Golden State Warriors Arena (Mission Bay Alliance et al. v. Office of Community Investment and Infrastructure and a separate non-CEQA lawsuit), (3) 8150 Sunset Boulevard Mixed Use Development which had 4 CEQA challenges to the project (Los Angeles Conservancy v. City of Los Angeles; Fix the City, Inc. v. City of Los Angeles; JDR Crescent v. City of Los Angeles; and Manners v. City of Los Angeles), and (4) the Los Angeles Clippers Arena (Saulo Eber Chan; MSG Forum, LLC v. Gavin C. Newsom; Joint Legislative Budget Committee). The first three challenges have demonstrated that expedited judicial review does not always guarantee a 270 day timeframe and cases can take longer to resolve due to, among other reasons, (1) ambiguity if the 270 days applies to business days or calendar days and if it includes appeals to the Supreme Court, (2) non-CEQA related actions which are not subject to the 270 day timeframe that are filed in addition to CEQA actions, or (3) consolidation of many, and sometimes complicated, actions. The fourth action, against the Los Angeles Clippers Arena, is still pending.
Comments
- Purpose of Bill. According to the author, “For decades, the San Diego region has explored ways to provide better connectivity to San Diego International Airport, the busiest single-runway airport in the nation. The airport anticipates an increase of 16 million annual passengers by 2050, which would result in a total of 40 million passengers annually. The projected increase in airport passengers is expected to exceed the capacity of current airport roadway connections. Due to the anticipated future growth combined with limited ground transit access to the airport, SANDAG, in partnership with the City of San Diego, the Port of San Diego, and the San Diego County Regional Airport Authority, has made it a chief priority to identify a solution for a direct transit connection to the airport. Optimally positioned near the airport, the OTC presents great potential to provide an enduring solution to the region’s longstanding challenge of airport connectivity and is one of several sites being considered for development of a Central Mobility Hub.
“On September 19, 2019, SANDAG and the Navy signed an initial agreement to explore options for redevelopment of the OTC. On January 23 of this year, SANDAG signed the Navy OTC Revitalization Agreement, which lays out a timeline for the Navy and SANDAG to explore the redevelopment of the OTC site to include a Central Mobility Hub. On January 24, the Navy began an environmental analysis of the intended revitalization project in accordance with NEPA. This analysis will enable the Navy to prepare an EIS outlining potential environmental impacts associated with the project. SANDAG will cooperate with the Navy to supplement this environmental analysis to be technically sufficient under the California Environmental Quality Act (CEQA.) SANDAG has committed $50 million in funding for continued Central Mobility Hub analysis, which includes environmental analysis, preliminary engineering, and complete corridor planning.
“As proposed to be amended, AB 2731 will strengthen environmental mitigation efforts for both the redevelopment of the NAVWAR facilities and the Central Mobility Hub and will enhance public participation and government transparency while providing certainty of process to allow both projects to begin construction in relatively short order. In light of the COVID-19 pandemic, this project, and the resulting public comment that will follow, will be essential to San Diego’s economic recovery.”
- This bill. There are three main components of this bill: the revitalization of the NAVWAR facilities at OTC, the construction of various residential, employment center, and mixed-use development projects located at OTC, and the construction of a transit and transportation facilities project – a multimodal regional transportation facility that includes a central mobility hub and transportation linkages that connect the central mobility hub to the San Diego regional transportation system and to the San Diego International Airport.
- Project tiering for TOD projects. Consistent with CEQA provisions, AB 2731 permits the EIS, which is being prepared by the Navy, to be used as an EIR if the EIS complies with CEQA. Additionally, AB 2731 allows a TOD project to tier off of that EIS, a process which is also consistent with existing CEQA streamlining provisions, if that TOD project meets certain criteria.
It is noted two of the criteria that the TOD project must meet to be eligible for tiering off of the broader EIR are (1) it implements and is consistent with land use standards approved by the Navy and SANDAG for the OTC site and the site plan for which an EIR was been certified before December 31, 2021, and (2) is consistent with the general use designation, density, building intensity, and applicable policies specified in the OTC site in either a SCS or APS for which ARB has accepted SANDAG’s determination that the SCS or APS would achieve the GHG emission reduction targets. Neither of these documents have been approved or accepted yet. The SCS is currently being updated and the site plan, which AB 2731 requires to meet a vehicle miles traveled (VMT) reduction of 25 percent based on the regional VMT identified in the SCS or APS, has not been developed.
Without having an approved site plan or SCS to refer to, it is difficult to know the exact type of project being streamlined. However, AB 2731 also requires, further environmental review of a TOD project if there are substantial changes or new information becomes available.
- Guaranteed Time Frames. Current law requires the courts to give CEQA-related cases preference over “all other civil actions… so that the action or proceeding shall be quickly heard and determined” (PRC §21167.1). In addition to this existing mandate, AB 2731 requires the courts, to the extent feasible, to complete the judicial review process for the TTF project within 270 business days for certain CEQA-related actions or proceedings. As a consequence, such mandates on a court delay access for other, unknown cases such as medical malpractice suits, wrongful death suits, or contract disputes, as well as potentially exacerbating a court’s backlog on civil documents such as filing a new civil complaint, processing answers and cross complaints, or processing a demurrer or summary judgement. Calendar preferences and guaranteed time frames create additional demands and burdens on our courts that have very limited resources and a never-ending supply of cases to hear.
- Why the rush? According to the bill’s sponsors, SANDAG, the need for this legislation is a timing issue. The bill’s sponsor is trying to take advantage of an opportunity to develop what would otherwise be federally-owned land and subject to NEPA. In exchange for SANDAG financing the revitalization of the NAVWAR facilities, the Navy will transfer to SANDAG what remains of the 70.5 acre site for development of TOD projects and the TTF project. The Navy is currently in the process of drafting its EIS for its NAVWAR facilities and will be able to proceed under normal NEPA requirements should an agreement not be reached between the Navy and SANDAG.
Sponsors of the bill feels this will be a missed opportunity for San Diego if AB 2731 is not enacted this year. While there is nothing that would prevent the Navy and SANDAG from partnering in future years for the development of the OTC site, the sponsors feel that this is a unique opportunity for both the Navy and the City of San Diego to benefit.
- Double referral. Due to the COVID-19 Pandemic and the unprecedented nature of the 2020 Legislative Session, all Senate Policy Committees are working under a compressed timeline. This timeline does not allow this bill to be referred and heard by more than one committee as a typical timeline would allow. In order to fully vet the contents of this measure for the benefit of Senators and the public, this analysis includes information from the Senate Judiciary Committee.
“This bill provides for expedited judicial review of CEQA challenges to a specified transit and transportation facilities project and thus implicates the jurisdiction of the Senate Judiciary Committee, which has historically disfavored such provisions.
“For a small handful of major projects—particularly, large “environmental leadership” projects and a few sports stadiums—existing law provides that, to the extent feasible, courts must resolve CEQA challenges to those projects within 270 days of the filing of the record of administrative proceedings. These provisions were the subject of protracted policy deliberations over concerns regarding the burden on courts, access to justice for other litigants, and the sufficiency of environmental review. This year, the Legislature is considering several bills that would extend such provisions to additional classes of projects.
“The widespread application of expedited review arguably magnifies the concerns described above. Additionally, it could have diminishing returns for project applicants: at some point, if the burden is too great, courts could fail to meet the 270-day deadline or even ignore it altogether. In fact, under separation of powers principles, the Legislature cannot constitutionally mandate that courts resolve cases on any particular timeframe. (See Saltonstall v. City of Sacramento (2014) 231 Cal.App.4th 837, 855-856 [upholding a similar 270-day expedited review provision for the Sacramento Kings arena only because it contained a “to the extent feasible” proviso].)
- Additional author’s amendment. The author would like to amend the bill to give Judicial Council an additional 6 months to amend the California Rules of Court, making the timing consistent with Judicial Council’s current rule-making calendar. Traditional committee process is to have such amendments be taken after a bill has been approved by the committee members and has been approved out of the committee. However, given the unique circumstances and tight timeframes, members of the committee may wish to make an exception.
The committee may wish to amend the bill to require Judicial Council to amend the Rules of Court by January 1, 2022.
SOURCE:
San Diego Association of Governments & City of San Diego (Co-sponsors)
SUPPORT:
City of San Diego (co-sponsor)
San Diego Association of Governments (co-sponsor)
Navy, Region Southwest
San Diego Military Advisory Council (SDMAC)
San Diego Regional Chamber of Commerce
OPPOSITION:
California Judges Association
Plumbing-heating-cooling Contractors Association of California
Western Electrical Contractors Association
-- END --
Date of Hearing: June 2, 2020
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
ABPCA Bill Id:AB 2731
Author:(Gloria) – As Amended Ver:May 6, 2020
Policy Committee: | Natural Resources | Vote: | 9 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill establishes special procedures under the California Environmental Quality Act (CEQA) for concurrent preparation of the administrative record, public hearings and mediation for a multimodal regional transportation facility project, including a central mobility hub, to serve as a connection to link regional transit to the San Diego International Airport.
FISCAL EFFECT:
Negligible, if any, additional state costs.
COMMENTS:
- Purpose. The San Diego Association of Governments (SANDAG), in partnership with the City of San Diego, the Port of San Diego and the San Diego County Regional Airport Authority, has made it a chief priority to identify a solution for a direct transit connection to the airport. Optimally positioned near the airport, the Old Town Center (OTC) presents an opportunity to provide a solution to the region’s longstanding challenge of airport connectivity and is one of several sites being considered for development of a Central Mobility Hub.
According to the author, “AB 2731 will establish important public processes for SANDAG to undertake should the Central Mobility Hub project move forward.”
- Background. CEQA provides a process for evaluating the environmental effects of applicable projects approved or undertaken by public agencies. For projects that are not exempt from CEQA, an initial study is prepared to determine if the projects may have a significant impact on the environment. If the initial study shows no significant impact, a negative declaration is issued. If the project may significantly impact the environment, a full Environmental Impact Report (EIR) must be prepared, including the identification of environmental impacts and required mitigation, compliance and reporting measures intended to reduce the environmental impacts to the extent feasible. CEQA also provides for public process and legal challenges.
CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines.
Additionally, if a project is not exempt from CEQA, but the initial study shows it would not result in a significant effect on the environment, the lead agency must prepare a negative declaration and no EIR is required.
- Objectives of Bill Could Be Achieved Under Current Law. SB 122, Chapter 476, Statutes of 2016, provides procedures for record preparation substantially similar to this bill. One difference is that this bill does not require the applicant to pay the lead agency’s costs. SANDAG explains that these provisions are not applicable to SANDAG’s project because SANDAG is the project proponent and will prepare the record at its own cost.
- Legislative Findings. This bill includes extensive findings from the prior version of the bill. The committee may wish to delete the findings which are no longer relevant.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: May 13, 2020
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Laura Friedman, Chair
ABPCA Bill Id:AB 2731 (
Author:Gloria) – As Amended Ver:May 6, 2020
SUBJECT: California Environmental Quality Act: City of San Diego: transit and transportation facilities projects
SUMMARY: Establishes special procedures under the California Environmental Quality Act (CEQA) for concurrent preparation of the administrative record, public hearings, and mediation for a “transit and transportation facilities” project (a multimodal regional transportation facility to serve as a connection to link regional transit to the San Diego International Airport).
EXISTING LAW:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines).
- Authorizes judicial review of CEQA actions taken by public agencies, following the agency's decision to carry out or approve the project. Challenges alleging improper determination that a project may have a significant effect on the environment, or alleging an EIR doesn't comply with CEQA, must be filed in the superior court within 30 days of filing of the notice of approval. The courts are required to give CEQA actions preference over all other civil actions.
- Establishes that a record of proceeding includes, but is not limited to, all application materials, staff reports, transcripts or minutes of public proceedings, notices, written comments, and written correspondence prepared by or submitted to the public agency regarding the proposed project.
- Establishes a procedure for the preparation, certification, and lodging of the record of proceedings. Specifically:
- Requires the plaintiff to file a request that the respondent public agency prepare the record of proceedings, and serve this request, together with the complaint or petition, personally upon the public agency within 10 days of the date the action or proceeding was filed.
- Requires the respondent public agency to prepare and certify the record of proceedings not later than 60 days from the date that plaintiff served the request; lodge a copy of the certified record with the court; and serve on the parties a notice that the record of proceedings has been certified and lodged with the court.
- Authorizes the plaintiff to elect to prepare the record subject to certification by the respondent public agency, or the parties may agree to an alternative method of preparing the record of proceedings, within the time limits specified in the law.
- Requires the parties to pay any reasonable costs or fees imposed for the preparation of the record of proceedings in conformance with any law or rule of court.
- Authorizes the plaintiff to move the court for sanctions, and the court to grant the plaintiff’s motion for sanctions, if the public agency fails to prepare and certify the record within the time limits specified in the law.
- Requires the plaintiff to file a request that the respondent public agency prepare the record of proceedings, and serve this request, together with the complaint or petition, personally upon the public agency within 10 days of the date the action or proceeding was filed.
- Authorizes an alternative procedure for concurrent preparation of the record of proceedings, where a lead agency, upon a project applicant's request, prepares the record of proceedings concurrently with the administrative process.
- Requires all documents and other materials placed in the record of proceedings to be posted on a Web site maintained by the lead agency.
- Requires the lead agency to make publicly available, in electronic format, the draft environmental document, and associated documents, for the project.
- Requires the lead agency to make any comment publicly available electronically within five days of its receipt.
- Requires the lead agency to certify the record of proceedings within 30 days after filing notice of determination or approval.
- Requires certain environmental review documents to include a notice, as specified, stating that the document is subject to this section.
- Requires the applicant to pay for the lead agency's cost of concurrently preparing and certifying the record of proceedings.
THIS BILL:
- Requires, notwithstanding any other law, the preparation and certification of the record of proceedings for the transit and transportation facilities project to be performed in the following manner:
- The lead agency for the project shall prepare the record of proceedings concurrently with the administrative process.
- All documents and other materials placed in the record of proceedings shall be posted on, and be downloadable from, an internet website maintained by the lead agency commencing with the date of the release of the draft EIR.
- The lead agency shall make available to the public in a readily accessible electronic format the draft EIR and all other documents submitted to, or relied on by, the lead agency in the preparation of the draft EIR.
- A document prepared by the lead agency after the date of the release of the draft EIR that is a part of the record of the proceedings shall be made available to the public in a readily accessible electronic format within five business days after the document is released or received by the lead agency.
- The lead agency shall encourage written comments on the project to be submitted in a readily accessible electronic format, and shall make any comment available to the public in a readily accessible electronic format within five days of its receipt.
- Within 14 business days after the receipt of any comment that is not in an electronic format, the lead agency shall convert that comment into a readily accessible electronic format and make it available to the public in that format.
- Notwithstanding paragraphs (b) to (f), inclusive, documents submitted to or relied on by the lead agency that were not prepared specifically for the project and are copyright protected are not required to be made readily accessible in an electronic format. For those copyright-protected documents, the lead agency shall make an index of these documents available in an electronic format no later than the date of the release of the draft EIR, or within five business days if the document is received or relied on by the lead agency after the release of the draft EIR. The index shall specify the libraries or lead agency offices in which hardcopies of the copyrighted materials are available for public review.
- The lead agency shall certify the final record of proceedings within five days after the filing of the notice of determination for the project.
- Requires the lead agency:
- To conduct an informational workshop within 10 days after the release of the draft EIR to inform the public of the key analyses and conclusions of the draft EIR.
- To hold a public hearing within 10 days before the close of the public comment period to receive testimony on the draft EIR. A transcript of the hearing shall be included as an appendix to the final EIR.
- Authorizes a commenter on the draft EIR to submit to the lead agency a written request for nonbinding mediation within five days following the close of the public comment period.
- Requires the lead agency to participate in nonbinding mediation with all commenters who submitted timely comments on the draft EIR and who requested the mediation.
- Requires mediation to end no later than 35 days after the close of the public comment period.
- Requires a request for mediation to identify all areas of dispute raised in the comment submitted by the commenter that are to be mediated.
- Requires the lead agency to select one or more mediators who shall be retired judges or recognized experts with at least five years’ experience in land use and environmental law or science, or mediation.
- Requires the lead agency to bear the costs of mediation.
- Requires a mediation session to be conducted on each area of dispute with the parties requesting mediation on that area of dispute.
- Requires the lead agency to adopt, as a condition of approval, any measures agreed upon by the lead agency and any commenter who requested mediation.
- Prohibits a commenter who agrees to a measure in mediation from raising the issue addressed by that measure as a basis for an action or proceeding challenging the lead agency’s decision to certify the EIR or to grant one or more initial project approvals.
- Requires the lead agency to file the notice of determination for the project within five days after the last initial project approval.
- Requires the lead agency, no later than three business days following the date of the release of the draft EIR, to make available to the public in a readily accessible electronic format the draft EIR and all other documents submitted to or relied on by the lead agency in the preparation of the draft EIR. Requires a document prepared by the lead agency after the date of the release of the draft EIR that is a part of the record of proceedings to be made available to the public in a readily accessible electronic format within five business days after the document is prepared or received by the lead agency, except for copyright-protected material as specified.
- Requires the lead agency to encourage written comments on the project to be submitted in a readily accessible electronic format, and to make any such comment available to the public in a readily accessible electronic format within five days of its receipt.
- Requires the lead agency, within seven business days after the receipt of any comment that is not in an electronic format, to convert that comment into a readily accessible electronic format and make it available to the public in that format.
- Requires the lead agency, within five days after the filing of the notice of determination, to certify the record of proceedings for the approval or determination and provide an electronic copy of the record of proceedings to a party that has submitted a written request for a copy. Authorizes the lead agency to charge and collect a reasonable fee from a party requesting a copy of the record of proceedings, which shall not exceed the reasonable cost of reproducing that copy.
- Requires the lead agency, within 10 days after being served with a complaint or a petition for a writ of mandate, to lodge a copy of the certified record of proceedings with the superior court.
- Requires any dispute over the content of the record of proceedings to be resolved by the superior court. Unless the superior court directs otherwise, requires a party disputing the content of the record of proceedings to file a motion to augment the record of proceedings at the time it files its initial brief.
FISCAL EFFECT: Unknown
COMMENTS:
- Author’s statement:
For decades, the San Diego region has explored ways to provide better connectivity to San Diego International Airport, the busiest single-runway airport in the nation. The airport anticipates an increase of 16 million annual passengers by 2050, which would result in a total of 40 million passengers annually. The projected increase in airport passengers is expected to exceed the capacity of current airport roadway connections. Due to the anticipated future growth combined with limited ground transit access to the airport, SANDAG, in partnership with the City of San Diego, the Port of San Diego, and the San Diego County Regional Airport Authority, has made it a chief priority to identify a solution for a direct transit connection to the airport. Optimally positioned near the airport, the Old Town Center (OTC) presents great potential to provide an enduring solution to the region’s longstanding challenge of airport connectivity and is one of several sites being considered for development of a Central Mobility Hub.
On September 19, 2019, SANDAG and the Navy signed an initial agreement to explore options for redevelopment of the OTC. On January 23 of this year, SANDAG signed the Navy OTC Revitalization Agreement, which lays out a timeline for the Navy and SANDAG to explore the redevelopment of the OTC site to include a Central Mobility Hub. On January 24, the Navy began an environmental analysis of the intended revitalization project in accordance with NEPA. This analysis will enable the Navy to prepare an EIS outlining potential environmental impacts associated with the project. SANDAG will cooperate with the Navy to supplement this environmental analysis to be technically sufficient under CEQA. SANDAG has committed $50 million in funding for continued Central Mobility Hub analysis, which includes environmental analysis, preliminary engineering, and complete corridor planning.
AB 2731 will establish important public processes for SANDAG to undertake should the Central Mobility Hub project move forward. In light of the COVID-19 pandemic, this project, and the resulting public comment that will follow, will be essential to San Diego’s economic recovery.
- Background. CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
An EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
Generally, CEQA actions taken by public agencies can be challenged in superior court once the agency approves or determines to carry out the project. CEQA appeals are subject to unusually short statutes of limitations. Under current law, court challenges of CEQA decisions generally must be filed within 30-35 days, depending on the type of decision. The courts are required to give CEQA actions preference over all other civil actions. However, the schedules for briefing, hearing, and decision are less definite. The petitioner must request a hearing within 90 days of filing the petition and, generally, briefing must be completed within 90 days of the request for hearing. There is no deadline specified for the court to render a decision.
In 2011, AB 900 and SB 292 established expedited judicial review procedures for a limited number of projects. For AB 900, it was large-scale projects meeting extraordinary environmental standards and providing significant jobs and investment. For SB 292, it was a proposed downtown Los Angeles football stadium and convention center project achieving specified traffic and air quality mitigations. As part of their expedited judicial review procedures, these bills required the lead agency to prepare and certify the record of proceedings concurrently with the administrative process and required the applicant to pay for it. It was commonly agreed that this would expedite preparation of the record for trial.
Since 2011, several additional bills have provided similar project-specific concurrent preparation procedures. In addition, in 2016, SB 122 established an optional concurrent preparation procedure for any CEQA project, subject to the lead agency agreeing, and the applicant paying the agency’s costs.
According to the author, the “transit and transportation facilities” project will consist of an intermodal transportation hub connecting the greater San Diego region to the San Diego International Airport. This project will provide enhanced efficient transportation options including bike and pedestrian connections while furthering region and statewide climate action goals. The transit and transportation project is currently being studied on a programmatic level as an alternative within the Navy’s NEPA environmental analysis for the redevelopment of the Navy’s OTC complex. SANDAG will be following up this programmatic study with a project level analysis under both NEPA and CEQA with the intent to issue a Notice of Preparation in late 2020.
- Objectives of bill could be achieved under current law. The procedures outlined in this bill for record preparation, public hearings, and mediation are available under current law. For example, the record preparation procedures largely duplicate the optional record preparation provisions of SB 122. One key difference is that, in contrast to all existing concurrent preparation requirements, this bill does not require the applicant to pay the agency’s costs. SANDAG explains that these provisions are not applicable to SANDAG’s project because SANDAG is the project proponent and will prepare the record at its own cost.
In sponsoring this bill, SANDAG appears to be requiring itself to do something it could choose to do under current law.
- Findings don’t relate to operative provisions. This bill includes extensive findings from the prior version, including findings related to Navy projects, that don’t relate to the operative provisions of the bill. The author and the committee may wish to consider striking these extraneous findings.
- Concerns. Though not opposed, Sierra Club California writes with the following concerns, which seem based on the prior (May 4) version of the bill and/or potential future amendments:
- CEQA exemptions for the Grand Central Station, especially if CEQA exemptions were extended to the Navy and City of San Diego’s planned new residential and commercial development expected to accompany the Grand Central Station and new NAVWAR facility. In our view, CEQA exemptions and streamlining could damage the integrity of California’s premier environmental law and limit meaningful environmental review and public participation processes for large scale development.
- Potential provisions authorizing environmental documents under the federal National Environmental Policy Act (NEPA) to be used as the environmental review documents under CEQA. CEQA has a much higher standard for environmental review than NEPA and requires mitigation measures to be taken for projects significantly impacting the environment. Moreover, given the current federal administration’s recent weakening of NEPA, we have less trust that meaningful environmental review will take place.
- Future project-specific CEQA environmental review would likely consist of lesser Mitigated Negative Declarations rather than full EIRs due to the programmatic level of review for the initial project.
REGISTERED SUPPORT / OPPOSITION:
Support
City of San Diego
San Diego Association of Governments (SANDAG)
Opposition
None on file
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
Bill Author
Bill Co-Author(s):