What does this bill do?

If at least 1% of domestic wells go dry in a basin the state calls “critically overdrafted,” the bill bars counties, cities, and other local well‑permitting agencies from approving new groundwater wells or major well changes in that basin unless specific conditions are met. Those conditions include a written verification from the agency that manages the basin saying the new well won’t conflict with the basin’s groundwater plan or make it harder to reach sustainability goals, and a local finding that the well won’t harm nearby wells or cause damaging land sinking; small domestic wells, public water system wells, many replacements and maintenance actions, and wells in basins under court settlements are exempt.

The summary is provided by generative AI which can make mistakes. For original language, please view the details in the table below.

Version:

Existing law requires the State Water Resources Control Board to adopt a model water well, cathodic protection well, and monitoring well drilling and abandonment ordinance implementing certain standards for water well construction, maintenance, and abandonment and requires each county, city, or water agency, where appropriate, not later than January 15, 1990, to adopt a water well, cathodic protection well, and monitoring well drilling and abandonment ordinance that meets or exceeds certain standards. Under existing law, if a county, city, or water agency, where appropriate, fails to adopt an ordinance establishing water well, cathodic protection well, and monitoring well drilling and abandonment standards, the model ordinance adopted by the state board is required to take effect on February 15, 1990, and is required to be enforced by the county or city and have the same force and effect as if adopted as a county or city ordinance.

Existing law, the Sustainable Groundwater Management Act, requires all groundwater basins designated as high- or medium-priority basins by the Department of Water Resources that are designated as basins subject to critical conditions of overdraft to be managed under a groundwater sustainability plan or coordinated groundwater sustainability plans by January 31, 2020, and requires all other groundwater basins designated as high- or medium-priority basins to be managed under a groundwater sustainability plan or coordinated groundwater sustainability plans by January 31, 2022, except as specified.

This bill would, if 1% of domestic wells go dry in a critically overdrafted basin, as specified, prohibit a county, city, or any other water well permitting agency from approving a permit for a new groundwater well or for an alteration to an existing well in a basin subject to the act and classified as a critically overdrafted basin unless specified conditions are met. Under the bill, these conditions would include a requirement that the county, city, or other water well permitting agency obtain a written verification from the groundwater sustainability agency that manages the basin or area of the basin where the well is proposed to be located determining that, among other things, the extraction by the proposed well would not be inconsistent with a sustainable groundwater management program, as provided, and that the proposed well would not decrease the likelihood of achieving a sustainability goal for the basin covered by such a plan. The bill would prescribe certain exemptions from these provisions. By imposing additional requirements on a local agency, the bill would impose a state-mandated local program.

The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.

This bill would provide that no reimbursement is required by this act for a specified reason.

Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law requires electrical corporations and gas corporations to annually notify the commission, as part of an ongoing proceeding or in a report otherwise required to be submitted to the commission, of each time that capital or expense revenue authorized by the commission for maintenance, safety, or reliability was redirected by the electrical corporation or gas corporation to other purposes. Existing law requires the commission to ensure that the notification is also made available in a timely fashion to the Office of the Safety Advocate, the Public Advocates Office of the Public Utilities Commission, and parties on the service list of any relevant proceeding.This bill would make nonsubstantive changes to those requirements.
Authors shown for version:
Amended Assembly (3/2/2023)

Bill Author