SB 604: Electricity: transmission and distribution infrastructure: assessment.

  • Session Year: 2023-2024
  • House: Senate
  • Latest Version Date: 2023-03-20

Current Status:

Failed

(2024-02-01: Returned to Secretary of Senate pursuant to Joint Rule 56.)

Introduced

In Committee

First Chamber

In Committee

Second Chamber

Enacted

Version:

Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the Public Utilities Commission, the Independent System Operator, transmission owners, users, and consumers, to adopt a strategic plan for the states electrical transmission grid, as provided.

This bill would require the Energy Commission, working with the State Air Resources Board and the Public Utilities Commission, to prepare a statewide assessment of the supply needs for transmission and distribution infrastructure and equipment that is necessary to achieve carbon neutrality by 2045, as specified. The bill would require the commission to update the assessment at least once every 3 years, and to submit the assessment to the Legislature on or before January 1, 2025, and on or before January 1 every 3 years thereafter.

Existing law authorizes the State Energy Resources Conservation and Development Commission to designate a transmission corridor zone on its own motion or by application of a person who plans to construct a highvoltage electrical transmission line within the state. Under existing law, designating a transmission corridor zone serves to identify a feasible corridor where future high-voltage electrical transmission lines can be built that are consistent with the states needs and objectives as set forth in the strategic plan for the states electric transmission grid adopted by the commission.This bill would make nonsubstantive changes to that provision.
Authors shown for version:
Amended Senate (3/20/2023)

Bill Author