SB 23: Water supply and flood risk reduction projects: expedited permitting.
- Session Year: 2023-2024
- House: Senate
- Latest Version Date: 2023-05-01
Current Status:
Failed
(2024-02-01: Returned to Secretary of Senate pursuant to Joint Rule 56.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
What does this bill do?
The bill requires public agencies and utilities that propose water‑supply or flood‑risk reduction projects to submit their certified environmental review documents and gives the Department of Fish and Wildlife and the State Water Resources Control Board (and regional boards) specific deadlines and streamlined steps to review and issue permits or agreements. It also directs boards to rely on approved habitat conservation or management plans to address impacts, requires annual public reports on covered projects, and allows state agencies to enter agreements to speed review.
The summary is provided by generative AI which can make mistakes. For original language, please view the details in the table below.
(1)Existing law prohibits an entity from substantially diverting or obstructing the natural flow of, or substantially changing or using any material from the bed, channel, or bank of, any river, stream, or lake, or deposit or dispose of debris, waste, or other material containing crumbled, flaked, or ground pavement where it may pass into any river, stream, or lake, except under specified conditions, including requiring the entity to send written notification to the Department of Fish and Wildlife regarding the activity in the manner prescribed by the department.
This bill would require a project proponent, if already required to submit a notification to the department, to submit to the department the certified or adopted environmental review document, as applicable, for the activity in the notification. The bill would require the department, under prescribed circumstances, to take certain actions within specified timelines, or within a mutually agreed-to extension of time. The bill would require, on or before January 1, 2025, and annually thereafter, the department to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to these provisions. The bill would repeal these provisions on January 1, 2029.
(2)Under the Porter-Cologne Water Quality Control Act, the State Water Resources Control Board (state board) and the California regional water quality control boards (regional boards) are the principal state agencies with primary authority over water quality matters. Existing law authorizes the state board to issue permits and promulgate procedures consistent with federal law.
This bill would require, if an applicant requests a preapplication consultation, the state board or regional boards to adhere to specified procedures and timelines in reviewing the application before issuing project certification. The bill would authorize a project proponent to petition the state board to reconsider its determination of application completeness, or to appeal to the state board any regional boards determination of application completeness.
This bill would require the state board or regional boards to use specified approved conservation and habitat management plans as watershed plans for purposes of implementing the procedures in issuing a project certification, unless the state board or regional boards issuing a project certification determine in writing plans, as specified, unless the permitting authority makes a determination in writing, based on substantial evidence in the record, that an approved plan does not substantially meet the definition of a watershed plan, as defined. The bill would place requirements on the state board and regional boards regarding its determination on what is considered a watershed plan, including making a proposed written determination, and providing for public comment and a written response on that proposed determination. The bill would require, by January 1, 2025, the state board to review and take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under specified federal law within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. The bill would require the state board and regional boards, as part of their implementation of the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State, to address the impacts of dredge and fill activities from water supply and flood risk projects. The bill would require, on January 1, 2025, and annually thereafter, the state board and regional boards to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding specified information related to water supply projects and flood risk reduction projects.
This bill would authorize a state agency, defined to mean any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project, to take specified actions in order to complete permit review and approval in an expeditious manner. The bill would make findings and declarations related to the need to expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment.
This bill would repeal these provisions on January 1, 2029.
(1)Existing law prohibits an entity from substantially diverting or obstructing the natural flow of, or substantially changing or using any material from the bed, channel, or bank of, any river, stream, or lake, or deposit or dispose of debris, waste, or other material containing crumbled, flaked, or ground pavement where it may pass into any river, stream, or lake, except under specified conditions, including requiring the entity to send written notification to the Department of Fish and Wildlife regarding the activity in the manner prescribed by the department.
This bill would require a project proponent, if already required to submit a notification to the department, to submit final environmental documentation to the department the certified or adopted environmental review document, as applicable, for the activity in the notification. The bill would require the department, under prescribed circumstances, to take certain actions within specified timelines, or within a mutually agreed-to extension of time. The bill would require, on or before January 1, 2025, and annually thereafter, the department to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to these provisions. The bill would repeal these provisions on January 1, 2029.
(2)Under the Porter-Cologne Water Quality Control Act, the State Water Resources Control Board (state board) and the California regional water quality control boards (regional boards) are the principal state agencies with primary authority over water quality matters. Existing law authorizes the state board to issue permits and promulgate procedures consistent with federal law.
This bill would require, if an applicant requests a preapplication consultation, the state board or regional boards to adhere to specified procedures and timelines in reviewing the application before issuing project certification. The bill would authorize a project proponent to petition the state board to reconsider its determination of application completeness, or to appeal to the state board any regional boards determination of application completeness.
This bill would require the state board or regional boards to use specified approved conservation and habitat management plans as watershed plans for purposes of implementing the procedures in issuing a project certification, unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, as defined. The bill would place requirements on the state board and regional boards regarding its determination on what is considered a watershed plan, including making a proposed written determination, and providing for public comment and a written response on that proposed determination. The bill would require, by January 1, 2025, the state board to review and adopt take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under specified federal law within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. The bill would require, on January 1, 2025, and annually thereafter, the state board and regional boards to prepare, provide public notice of, make available for public review on their its internet website, and submit to the relevant legislative committees, as specified, a report regarding specified information related to water supply projects and flood risk reduction projects.
This bill would authorize a state agency, defined to mean any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project, to take specified actions in order to complete permit review and approval in an expeditious manner. The bill would make findings and declarations related to the need to expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment.
This bill would repeal these provisions on January 1, 2029.
(1)Existing law prohibits an entity from substantially diverting or obstructing the natural flow of, or substantially changing or using any material from the bed, channel, or bank of, any river, stream, or lake, or deposit or dispose of debris, waste, or other material containing crumbled, flaked, or ground pavement where it may pass into any river, stream, or lake, except under specified conditions, including requiring the entity to send written notification to the Department of Fish and Wildlife regarding the activity in the manner prescribed by the department.
This bill would require a project proponent, if already required to submit a notification to the department, to complete and submit final environmental documentation to the department for the activity in the notification. The bill would require the department, under prescribed circumstances, to take specified certain actions within 180 days, specified timelines, or within a mutually agreed-to extension of time, of receiving notification from a project proponent. time.
(2)Under the Porter-Cologne Water Quality Control Act, the State Water Resources Control Board (state board) and the California regional water quality control boards (regional boards) are the principal state agencies with primary authority over water quality matters. Existing law authorizes the state board to issue permits and promulgate procedures consistent with federal law.
This bill would require, if an applicant requests a preapplication consultation, the state board or regional boards to adhere to specified procedures and timelines in reviewing the application before issuing project certification. The bill would authorize a project proponent to petition the state board to reconsider a its determination of application completeness, or to appeal to the state board any regional boards determination of application completeness.
This bill would require the state board or regional boards to use specified approved conservation and habitat management plans as watershed plans for purposes of implementing the procedures in issuing a project certification, unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, as defined. The bill would place requirements on the state board and regional boards regarding its determination on what is considered a watershed plan, including making a proposed written determination, and providing for public comment and a written response on that proposed determination. The bill would require, by January 1, 2025, the state board to review and adopt general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under specified federal law within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. The bill would require, on January 1, 2025, and annually thereafter, the state board and regional boards to prepare, provide public notice of, make available for public review on their internet website, and submit to the relevant legislative committees, as specified, a report regarding specified information related to water supply projects and flood risk reduction projects.
This bill would authorize a state agency, defined to mean any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project, to take specified actions in order to complete permit review and approval in an expeditious manner. The bill would make findings and declarations related to the need to expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment.
(1)Existing law prohibits an entity from substantially diverting or obstructing the natural flow of, or substantially changing or using any material from the bed, channel, or bank of, any river, stream, or lake, or deposit or dispose of debris, waste, or other material containing crumbled, flaked, or ground pavement where it may pass into any river, stream, or lake, except under specified conditions, including requiring the entity to send written notification to the Department of Fish and Wildlife regarding the activity in the manner prescribed by the department.
This bill would require a project proponent, if already required to submit a notification to the department, to complete and submit environmental documentation to the department for the activity in the notification. The bill would require the department, under prescribed circumstances, to take specified actions within 180 days, or a mutually agreed-to extension of time, of receiving notification from a project proponent.
(2)Under the Porter-Cologne Water Quality Control Act, the State Water Resources Control Board (state board) and the California regional water quality control boards (regional boards) are the principal state agencies with primary authority over water quality matters. Existing law authorizes the state board to issue permits and promulgate procedures consistent with federal law.
This bill would require, if an applicant requests a preapplication consultation, the state board or regional boards to adhere to specified procedures in reviewing the application before issuing project certification. The bill would authorize a project proponent to petition the state board to reconsider a determination of application completeness, or to appeal to the state board any regional boards determination of application completeness.
This bill would require the state board or regional boards to use specified approved conservation and habitat management plans as watershed plans for purposes of implementing the procedures in issuing a project certification, unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, as defined. The bill would place requirements on the state board and regional boards regarding its determination on what is considered a watershed plan, including making a proposed written determination, and providing for public comment and a written response on that proposed determination. The bill would require, by January 1, 2025, the state board to review and adopt general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under specified federal law within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. The bill would require, on January 1, 2025, and annually thereafter, the state board and regional boards to prepare, provide public notice of, make available for public review on their internet website, and submit to the relevant legislative committees, as specified, a report regarding specified information related to water supply projects and flood risk reduction projects.
This bill would authorize a state agency, defined to mean any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project, to take specified actions in order to complete permit review and approval in an expeditious manner. The bill would make findings and declarations related to the need to expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment.
The California Safe Drinking Water Act provides for the operation of public water systems and imposes on the State Water Resources Control Board various duties and responsibilities for the regulation and control of drinking water in the state, including, among other things, overseeing the issuance and enforcement of public water system permits, as provided.Existing law authorizes specified works of improvement for the control, conservation, and utilization of destructive flood waters and the reclamation and protection of lands that are susceptible to overflow by flood waters.This bill would express the intent of the Legislature to enact subsequent legislation to expedite the regulatory permitting process for water supply and flood risk reduction projects, as provided.The California Safe Drinking Water Act provides for the operation of public water systems and imposes on the State Water Resources Control Board various duties and responsibilities for the regulation and control of drinking water in the state, including, among other things, overseeing the issuance and enforcement of public water system permits, as provided.
Existing law authorizes specified works of improvement for the control, conservation, and utilization of destructive flood waters and the reclamation and protection of lands that are susceptible to overflow by flood waters.
This bill would express the intent of the Legislature to enact subsequent legislation to expedite the regulatory permitting process for water supply and flood risk reduction projects, as provided.
(a)For purposes of this section, the following definitions apply:
(1)Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.
(2)Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.
(3)Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.
(4)Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.
(b)A project proponent shall do both of the following:
(1)Submit a complete notification for the project activity to the department when required under Section 1602.
(2)Submit to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.
(c)(1)In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:
(A)One hundred eighty days after receipt of a complete notification, as determined by the department.
(B)Sixty days after receipt of the certified or adopted environmental review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement.
(2)Nothing in paragraph (1) shall effect affect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.
(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.
(d)If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).
(e)On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.
(f)This section shall remain in effect only until January 1, 2029, and as of that date is repealed.
SEC. 2.The heading of Article 1 (commencing with Section 13370) is added to Chapter 5.5 of Division 7 of the Water Code, to read:1.Implementation of the Federal Water Pollution Control ActSEC. 3.Article 2 (commencing with Section 13389.1) is added to Chapter 5.5 of Division 7 of the Water Code, to read:2.Water Supply and Flood Risk Reduction Permits13389.1.For the purpose of this article, the following definitions apply:
(a)Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.
(b)Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).
(c)Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).
(d)Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.
(e)Procedures means the State Wetland Definition and Procedures for Discharge Discharges of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.
(f)Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376. Section 13160.
(g)Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.
(h)State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.
(i)Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or drinking water treatment facility.
(j)Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.
13389.2.(a)(1)This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.
(2)The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.
(3)The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.
(4)Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.
(b)(1)Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:
(A)One hundred eighty days after receipt of a complete application.
(B)Sixty Ninety days after receipt of final the certified or adopted environmental documentation review document, as applicable, required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.
(2)Paragraph (1) shall apply if the project proponent does all of the following:
(A)Requests a preapplication consultation.
(B)Files a complete application for project certification.
(C)If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project.
(D)Submits final environmental documentation to the state board or regional boards the certified or adopted environmental review document, as applicable, for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.
(c)The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.
(d)If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.
(e)(1)If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.
(2)Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.
(f)(1)If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.
(2)The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.
(3)If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.
(4)If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.
(g)The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.
(h)The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.
(i)This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).
(j)Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.
13389.3.(a)The Legislature finds and declares all of the following:
(1)On that on April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources. as a watershed plan for those aquatic resources, unless the permitting authority makes a written determination, based on substantial evidence in the record, that the habitat conservation plan or natural communities conservation plan does not substantially meet the definition of a watershed plan for those aquatic resources.
(2)The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.(3)To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.(b)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:(1)Habitat conservation plans that include biological goals for aquatic resources.(2)Natural communities conservation plans that include biological goals for aquatic resources.(3)Habitat management plans that include biological goals for aquatic resources.(c)(1)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.(2)The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:(A)The watershed plan addresses the project impacts to waters of the state.(B)The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.(C)The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.(3)For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:(A)Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.(B)Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.(d)By January 1, 2025, the state board shall review and take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In its consideration of the general water quality certifications, the state board shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.(b)The state board and regional boards shall implement the procedures, including provisions related to watershed plans, to address the impacts of dredge and fill activities from water supply and flood risk projects.
(e)(c)Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding, at a minimum, all of the following:
(1)The water supply projects and flood risk reduction projects for which project certifications have been issued.
(2)The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.
(3)Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.
(4)The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.
13389.4.(a)A state agency may do any of the following:
(1)Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.
(2)Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.
(3)Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.
(b)This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.
(c)This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.
(d)The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.
13389.5.This article shall remain in effect only until January 1, 2029, and as of that date is repealed.
(a)For purposes of this section, the following definitions apply:
(1)Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.
(2)Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.
(3)Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.
(4)Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.
(b)A project proponent shall do both of the following:
(1)Submit a complete notification for the project activity to the department when required under Section 1602.
(2)Submit final environmental documentation to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.
(c)(1)In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:
(A)One hundred eighty days after receipt of a complete notification. notification, as determined by the department.
(B)Sixty days after receipt of final the certified or adopted environmental documentation review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement.
(2)Nothing in paragraph (1) shall effect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.
(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.
(d)If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).
(e)On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.
(f)This section shall remain in effect only until January 1, 2029, and as of that date is repealed.
SEC. 2.The heading of Article 1 (commencing with Section 13370) is added to Chapter 5.5 of Division 7 of the Water Code, to read:1.Implementation of the Federal Water Pollution Control ActSEC. 3.Article 2 (commencing with Section 13389.1) is added to Chapter 5.5 of Division 7 of the Water Code, to read:2.Water Supply and Flood Risk Reduction Permits13389.1.For the purpose of this article, the following definitions apply:
(a)Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.
(b)Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).
(c)Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).
(d)Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.
(e)Procedures means the State Wetland Definition and Procedures for Discharge of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.
(f)Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376.
(g)Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.
(h)State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.
(i)Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.
(j)Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.
13389.2.(a)(1)This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.
(2)The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.
(3)The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.
(4)Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.
(b)(1)Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:
(A)One hundred eighty days after receipt of a complete application.
(B)Sixty days after receipt of final environmental documentation required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.
(2)Paragraph (1) shall apply if the project proponent does all of the following:
(A)Requests a preapplication consultation.
(B)Files a complete application for project certification.
(C)If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project.
(D)Submits final environmental documentation to the state board or regional boards for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.
(c)The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.
(d)If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.
(e)(1)If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.
(2)Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.
(f)(1)If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.
(2)The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.
(3)If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.
(4)If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.
(g)The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.
(h)The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.
(i)This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).
(j)Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.
13389.3.(a)The Legislature finds and declares all of the following:
(1)On April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources.
(2)The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.
(3)To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.
(b)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:
(1)Habitat conservation plans that include biological goals for aquatic resources.
(2)Natural communities conservation plans that include biological goals for aquatic resources.
(3)Habitat management plans that include biological goals for aquatic resources.
(c)(1)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.
(2)The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:
(A)The watershed plan addresses the project impacts to waters of the state.
(B)The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.
(C)The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.
(3)For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:
(A)Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.
(B)Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.
(d)By January 1, 2025, the state board shall review and adopt take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In adopting its consideration of the general water quality certifications, the state board shall rely upon an shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code. Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.
(e)Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, and make available for public review on their its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees, committees a report regarding, at a minimum, all of the following:
(1)The water supply projects and flood risk reduction projects for which project certifications have been issued.
(2)The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.
(3)Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.
(4)The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.
13389.4.(a)A state agency may do any of the following:
(1)Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.
(2)Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.
(3)Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.
(b)This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.
(c)This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.
(d)The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.
13389.5.This article shall remain in effect only until January 1, 2029, and as of that date is repealed.
(a)For purpose purposes of this section, the following definitions apply:
(1)Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification modification, including nature-based solutions, where flood risk reduction or sea level rise protection is an a primary objective of the project.
(2)Notification means the documents described in subparagraphs (A) to (E), (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.
(3)Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.
(4)Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.
(b)A project proponent shall do both of the following:
(1)Submit a complete notification for the project activity to the department when required under this chapter. Section 1602.
(2)Complete and submit Submit final environmental documentation to the department for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.
(c)Notwithstanding any other law, (1)In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall, within 180 days of receipt of a notification from the project proponent, shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603 unless 1603, by either of the following dates, whichever is later:
(A)One hundred eighty days after receipt of a complete notification.
(B)Sixty days after receipt of final environmental documentation required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement.
(2)Nothing in paragraph (1) shall effect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602 1602, which applies because when the department did does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete. If
(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.
(d)If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the 180-day time period. time period provided in subdivision (c).
SEC. 2.The heading of Article 1 (commencing with Section 13370) is added to Chapter 5.5 of Division 7 of the Water Code, to read:1.Implementation of the Federal Water Pollution Control ActSEC. 3.Article 2 (commencing with Section 13389.1) is added to Chapter 5.5 of Division 7 of the Water Code, to read:2.Water Supply and Flood Risk Reduction Permits13389.1.For the purpose of this article, the following definitions apply:
(a)Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification modification, including nature-based solutions, where flood risk reduction or sea level rise protection is an a primary objective of the project.
(b)Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).
(c)Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).
(d)Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.
(e)Procedures means the State Wetland Definition and Procedures for Discharge of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.
(f)Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376.
(g)Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.
(h)State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.
(i)Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.
(j)Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.
13389.2.(a)(1)This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.
(2)The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.
(3)The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.
(4)Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.
(b)(1)Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall issue take final action on a project certification within 180 days if a project proponent does all of the following: by either of the following dates, whichever is later:
(A)One hundred eighty days after receipt of a complete application.
(B)Sixty days after receipt of final environmental documentation required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.
(2)Paragraph (1) shall apply if the project proponent does all of the following:
(1)(A)Requests a preapplication consultation.
(2)(B)Files a complete application for project certification.
(3)(C)If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project.
(4)Completes and submits completed(D)Submits final environmental documentation to the state board or regional boards for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.
(c)The state board or regional board shall notify the project proponent in writing whether the submittal application is complete no later than 30 days after the submittal of an application or petition. If the submittal application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.
(d)If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.
(e)(1)If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.
(2)Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the notification, supplemental materials, determine the completeness of the application or petition with the supplemental material materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.
(f)(1)If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.
(2)The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.
(3)If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.
(4)If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.
(g)The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.
(h)The project proponent may petition the state board to reconsider a its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the appropriate state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.
(i)This section does not supersede or otherwise amend any deadlines set forth by or in the federal Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).
(j)Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.
13389.3.(a)The Legislature finds and declares all of the following:
(1)On April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, so long as if the plan includes biological goals for aquatic resources.
(2)The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.
(3)To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, so long as if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.
(b)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:
(1)Habitat conservation plans that include biological goals for aquatic resources.
(2)Natural communities conservation plans that include biological goals for aquatic resources.
(3)Habitat management plans that include biological goals for aquatic resources.
(c)(1)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation for impacts to waters of the state provided through compliance with any approved habitat conservation plan, natural community conservation plan, or habitat management plan, so long as required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.
(2)The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1). (1) if all of the following conditions are met:
(A)The watershed plan addresses the project impacts to waters of the state.
(B)The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.
(C)The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.
(3)For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:
(A)Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.
(B)Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.
(d)By January 1, 2025, the state board shall review and adopt general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the federal Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In adopting the general water quality certifications, the state board shall rely upon an environmental review completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code.
(e)Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, and make available for public review on their internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees, a report regarding, at a minimum, all of the following:
(1)The water supply projects and flood risk reduction projects for which project certifications have been issued.
(2)The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.
(3)Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.
(4)The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the federal Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.
13389.4.(a)A state agency may do any of the following:
(1)Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.
(2)Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.
(3)Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.
(b)This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.
(c)This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.
(d)The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.
(a)For purpose of this section, the following definitions apply:
(1)Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification where flood risk reduction or sea level rise protection is an objective of the project.
(2)Notification means the documents described in subparagraphs (A) to (E), inclusive, of paragraph (1) of subdivision (a) of Section 1602.
(3)Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.
(4)Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.
(b)A project proponent shall do both of the following:
(1)Submit a complete notification for the project to the department when required under this chapter.
(2)Complete and submit environmental documentation to the department for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.
(c)Notwithstanding any other law, if the department determines that a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall, within 180 days of receipt of a notification from the project proponent, issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603 unless subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602 applies because the department did not issue a draft agreement to the project proponent within 60 days of the date the notification is complete. If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.
(d)If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the 180-day time period.
SEC. 2.The heading of Article 1 (commencing with Section 13370) is added to Chapter 5.5 of Division 7 of the Water Code, to read:1.Implementation of the Federal Water Pollution Control ActSEC. 3.Article 2 (commencing with Section 13389.1) is added to Chapter 5.5 of Division 7 of the Water Code, to read:2.Water Supply and Flood Risk Reduction Permits13389.1.For the purpose of this article, the following definitions apply:
(a)Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification where flood risk reduction or sea level rise protection is an objective of the project.
(b)Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).
(c)Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).
(d)Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.
(e)Procedures means the State Wetland Definition and Procedures for Discharge of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.
(f)Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376.
(g)Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.
(h)State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.
(i)Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.
(j)Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.
13389.2.(a)(1)This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.
(2)The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.
(3)The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.
(4)Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.
(b)Notwithstanding any other law, the state board or regional boards shall issue project certification within 180 days if a project proponent does all of the following:
(1)Requests a preapplication consultation.
(2)Files a complete application for project certification.
(3)If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project.
(4)Completes and submits completed environmental documentation to the state board or regional boards for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.
(c)The state board or regional board shall notify the project proponent in writing whether the submittal is complete no later than 30 days after the submittal of an application or petition. If the submittal is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.
(d)If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.
(e)(1)If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.
(2)Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the notification, determine the completeness of the application or petition with the supplemental material and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.
(f)(1)If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.
(2)The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.
(3)If the state board or regional board does not, within 30 days of receipt of application materials from applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.
(4)If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.
(g)The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.
(h)The project proponent may petition the state board to reconsider a determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the appropriate board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.
(i)This section does not supersede or otherwise amend any deadlines set forth by or in the federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).
(j)Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.
13389.3.(a)The Legislature finds and declares all of the following:
(1)On April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, so long as the plan includes biological goals for aquatic resources.
(2)The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.
(3)To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, so long as those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.
(b)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:
(1)Habitat conservation plans that include biological goals for aquatic resources.
(2)Natural communities conservation plans that include biological goals for aquatic resources.
(3)Habitat management plans that include biological goals for aquatic resources.
(c)(1)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation for impacts to waters of the state provided through compliance with any approved habitat conservation plan, natural community conservation plan, or habitat management plan, so long as the public entity administering the habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.
(2)The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1).
(3)For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:
(A)Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.
(B)Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.
(d)By January 1, 2025, the state board shall review and adopt general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In adopting the general water quality certifications, the state board shall rely upon an environmental review completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code.
(e)Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, and make available for public review on their internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees, a report regarding, at a minimum, all of the following:
(1)The water supply projects and flood risk reduction projects for which project certifications have been issued.
(2)The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.
(3)Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.
(4)The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.
13389.4.(a)A state agency may do any of the following:
(1)Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.
(2)Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.
(3)Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.
(b)This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.
(c)This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.
(d)The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.
SECTION 1.It is the intent of the Legislature to enact subsequent legislation to expedite the regulatory permitting process for water supply and flood risk reduction projects, consistent with Californias Water Supply Strategy, Adapting to a Hotter, Drier Future, released by Governor Newsoms administration in August 2022.It is the intent of the Legislature to enact subsequent legislation to expedite the regulatory permitting process for water supply and flood risk reduction projects, consistent with Californias Water Supply Strategy, Adapting to a Hotter, Drier Future, released by Governor Newsoms administration in August 2022.
|
Date
|
Status
|
|---|---|
| Feb 1, 2024 | Returned to Secretary of Senate pursuant to Joint Rule 56. |
| May 18, 2023 | May 18 hearing: Held in committee and under submission. |
| May 16, 2023 | Set for hearing May 18. |
| May 15, 2023 | May 15 hearing: Placed on APPR suspense file. |
| May 5, 2023 | Set for hearing May 15. |
| May 1, 2023 | Read second time and amended. Re-referred to Com. on APPR. |
| Apr 27, 2023 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 7. Noes 0. Page 936.) (April 26). |
| Apr 18, 2023 | Set for hearing April 26. |
| Apr 12, 2023 | Read second time and amended. Re-referred to Com. on E.Q. |
| Apr 11, 2023 | From committee: Do pass as amended and re-refer to Com. on E.Q. (Ayes 10. Noes 0. Page 657.) (April 11). |
| Mar 30, 2023 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on N.R. & W. |
| Mar 23, 2023 | Set for hearing April 11. |
| Feb 22, 2023 | Re-referred to Coms. on N.R. & W. and E.Q. |
| Feb 9, 2023 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Jan 18, 2023 | Referred to Com. on RLS. |
| Dec 6, 2022 | From printer. May be acted upon on or after January 5. |
| Dec 5, 2022 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| May 15, 2023 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 26, 2023 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Environmental Quality |
Passed |
|
| Apr 11, 2023 | Do pass as amended, but first amend, and re-refer to the Committee on [Environmental Quality] | Senate Standing Committee on Natural Resources and Water |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Agricultural Council Of California | ** Support | |
| Amador Water Agency | ** Support | |
| American Pistachio Growers | ** Support | |
| Association Of California Water Agencies | * Support | Apr 26, 2023 |
| Bay Area Council | ** Support | |
| Bella Vista Water District | ** Support | |
| Bellflower Somerset Mutual Water Company | ** Support | |
| CA State Association of Counties | * Support | Apr 26, 2023 |
| Cal DeSal | * Support | Apr 11, 2023 |
| Caldesal | * Support | Apr 26, 2023 |
| California Alliance for Jobs | ** Support | |
| California Building Industry Association | ** Support | |
| California Central Valley Flood Control Association | ** Support | |
| California Chamber Of Commerce | * Support | Apr 26, 2023 |
| California Citrus Mutual | * Support | Apr 26, 2023 |
| California Council For Environmental And Economic Balance | * Support | Apr 26, 2023 |
| California Date Commission | ** Support | |
| California Environmental Voters | ** Against | |
| California Farm Bureau Federation | ** Support | |
| California Fresh Fruit Association | ** Support | |
| California Municipal Utilities Association | * Support | Apr 26, 2023 |
| California Special Districts Association | * Support | Apr 26, 2023 |
| California Strawberry Commission | ** Support | |
| California Trout | * Against | Apr 26, 2023 |
| Calleguas Municipal Water District | ** Support | |
| Carmichael Water District | ** Support | |
| Citrus Heights Water District | ** Support | |
| City of Belmont | * Support | Apr 26, 2023 |
| City of Santa Rosa | * Support | Apr 26, 2023 |
| Clean Water Action | * Against | Apr 26, 2023 |
| Coachella Valley Municipal Water District | * Support | Apr 11, 2023 |
| Coachella Valley Water District | * Support | Apr 26, 2023 |
| Coastside County Water District | ** Support | |
| Community Water Center | ** Against | |
| County of Humboldt | ** Support | |
| County of Monterey | ** Support | |
| County of Tuolumne | ** Support | |
| Cucamonga Valley Water District | ** Support | |
| Defenders Of Wildlife | * Against | Apr 26, 2023 |
| Desert Water Agency | ** Support | |
| Eastern Municipal Water District | * Support | Apr 26, 2023 |
| El Dorado Irrigation District | ** Support | |
| Elk Grove Water District | ** Support | |
| Elsinore Valley Municipal Water District | ** Support | |
| Environmental Law Foundation | * Against | Apr 26, 2023 |
| Florin Resource Conservation District/elk Grove Water District | ** Support | |
| Foothill Municipal Water District | ** Support | |
| Fresno Metropolitan Flood Control District | ** Support | |
| Friends of the River | ** Against | |
| Golden State Salmon Association | ** Against | |
| Habitat for Humanity, Merced/Stanislaus County | ** Support | |
| Hidden Valley Lake Community Services District | * Support | Apr 26, 2023 |
| Humboldt Bay Municipal Water District | ** Support | |
| Indian Wells Valley Water District | ** Support | |
| Institute For Fisheries Resources | ** Against | |
| Irvine Ranch Water District | ** Support | |
| Kings River Conservation District | ** Support | |
| Laguna Beach County Water District | ** Support | |
| Las Virgenes Municipal Water District | * Support | Apr 26, 2023 |
| Las Virgenes Water District | * Support | Apr 11, 2023 |
| Leadership Counsel for Justice & Accountability | ** Against | |
| Los Angeles Waterkeeper | ** Against | |
| McKinleyville Community Services District | ** Support | |
| Mesa Water District | ** Support | |
| Midpeninsula Regional Open Space District | * Support | Apr 26, 2023 |
| Modesto Irrigation District | ** Support | |
| Mono Lake Committee | ** Against | |
| Monterey Peninsula Water Management District | ** Support | |
| Municipal Water District Of Orange County | * Support | Apr 26, 2023 |
| Natural Resources Defense Council | * Against | Apr 26, 2023 |
| Nisei Farmers League | ** Support | |
| Nisei Farmers League Inc. | ** Support | |
| North Marin Water District | ** Support | |
| Olivenhain Municipal Water District | ** Support | |
| Orchard Dale Water District | ** Support | |
| Pacific Coast Federation Of Fishermen'S Associations | ** Against | |
| Padre Dam Municipal Water District | ** Support | |
| Pajaro Valley Water Management Agency | ** Support | |
| Palmdale Water District | ** Support | |
| Placer County Water Agency | ** Support | |
| Puente Basin Water Agency | ** Support | |
| Rancho California Water District | * Support | Apr 26, 2023 |
| Rancho Water | ** Support | |
| Regional Water Authority | ** Support | |
| Restore the Delta | ** Against | |
| Roland Water District | * Support | Apr 11, 2023 |
| Rowland Water District | ** Support | |
| San Bernardino Valley Municipal Water District | ** Support | |
| San Diego County Water Authority | * Support | Apr 26, 2023 |
| San Francisco Baykeeper | ** Against | |
| San Joaquin Council Of Governments | ** Support | |
| San Juan Water District | ** Support | |
| San Luis Delta Mendota Authority | * Support | Apr 26, 2023 |
| Santa Clara Valley Habitat Agency | ** Support | |
| Santa Clara Valley Water District | * Support | Apr 26, 2023 |
| santa fe irrigation district | ** Support | |
| Santa Margarita Water District | * Support | Apr 26, 2023 |
| Sierra Club California | * Against | Apr 26, 2023 |
| Silicon Valley Youth Climate Action | ** Against | |
| Solano County Water Agency | ** Support | |
| Sonoma County Water Agency | * Support | Apr 26, 2023 |
| Southern California Water Coalition | ** Support | |
| State Water Contractors | * Support | Apr 26, 2023 |
| Stockton East Water District | ** Support | |
| Tahoe City Public Utility District | ** Support | |
| Three Valleys Municipal Water District | ** Support | |
| Trout Unlimited | * Against | Apr 26, 2023 |
| Tuolumne County Water Agency | ** Support | |
| Tuolumne Utilities District | ** Support | |
| Turlock Irrigation District | * Support | Apr 26, 2023 |
| Union Of Concerned Scientists | * Against | Apr 26, 2023 |
| United Water Conservation District | * Support | Apr 26, 2023 |
| United Way of Merced County | ** Support | |
| Upper San Gabriel Valley Municipal Water District | ** Support | |
| Utica Water and Power Authority | ** Support | |
| Valley Ag Water Coalition | ** Support | |
| Valley Center Municipal Water District | ** Support | |
| Valley Onward | ** Support | |
| Vista Irrigation District | ** Support | |
| Walnut Valley Water District | ** Support | |
| Water Replenishment District Of Southern California | ** Support | |
| Western Growers | * Support | Apr 26, 2023 |
| Western Municipal Water District | ** Support | |
| Western Plant Health Association | ** Support | |
| Yorba Linda Water District | * Support | Apr 26, 2023 |
SENATE COMMITTEE ON
Senator Anthony Portantino, Chair
2023 - 2024 Regular Session
SB 23 (Caballero) - Water supply and flood risk reduction projects: expedited permitting
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would require the State Water Resources Control Board (SWRCB) and regional water quality boards to use an approved regional habitat conservation plan or natural communities conservation plan, as specified, as a watershed plan for aquatic resources, as specified. It would also require the Department of Fish and Wildlife (DFW) and SWRCB, for water supply projects and flood risk reduction projects, to issue a final Lake and Streambed Alteration Agreement (LSAA) or take final action on water quality certifications issued pursuant to either Porter-Cologne or under the federal CWA, as applicable, within specific timeframes.
Fiscal Impact:
- SWRCB estimates one-time costs of $225,000 (General Fund or special fund) to revise databases and update processes, develop a reporting mechanism, and train staff. In addition, SWRCB estimates ongoing costs of $450,000 annually (General Fund or special fund) to implement a petition process during the application review period as required under this bill.
- Unknown, likely significant costs (General Fund or special fund) for the Department of Fish and Wildlife (DFW) to issue a final LSAA or take final action on water quality certifications issued pursuant to either Porter-Cologne or under the federal Clean Water Act, as applicable, within specific timeframes.
Background:
Lake and streambed alteration. The Lake and Streambed Alteration Program (Fish and Game Code (FGC) §§ 1602 et. seq.) requires any person, state or local governmental agency, or public utility to notify the California Department of Fish and Wildlife (DFW) before beginning any activity that may do any of the following:
- Divert or obstruct the natural flow of any river, stream, or lake;
- Change the bed, channel, or bank of any river, stream, or lake;
- Use material from any river, streak, or lake; or
- Deposit or dispose of material into any river, stream, or lake.
Once DFW receives the notification, DFW determines whether the notification is complete. If the notification is deemed incomplete, DFW contacts the notifying entity and informs them what information must be provided to make it complete. Once a notification is deemed complete, DFW determines if the project described in the notification will substantially alter a river, stream, or lake. If DFW determines that the project will not substantially alter a river, stream, or lake, DFW provides written verification of that fact and the entity may conduct that activity as described in the notification.
If DFW determines that the activity, as described in the notification, would substantially alter a river, stream, or lake, and that it may substantially adversely affect existing fish or wildlife resources, a Lake or Streambed Alteration Agreement (LSAA) is required. An LSAA is a type of permit that includes mitigation measures necessary to protect fish and wildlife resources. Before issuing an LSAA, a project must have completed a California Environmental Quality Act (CEQA) analysis. Emergency work, such as those necessary to protect life or property, do not require an LSAA.
This law was first enacted in 1970, reenacted in 1976, and amended in 2003, but the purpose of the law has never changed. The law declares, “The protection and conservation of the fish and wildlife resources of this state are of utmost public interest. Fish and wildlife are the property of the people and provide a major contribution to the economy of the state, as well as providing a significant part of the people’s food supply; therefore their conservation is a proper responsibility of the state.” (FGC §1600)
State and federal regulatory authority over water quality. The Porter-Cologne Water Quality Control Act (Porter-Cologne), enacted in 1969, vests the SWRCB with ultimate authority over state water quality policy. The regional water quality control boards oversee water quality at the local level. Collectively, these are known as the “Water Boards.” Porter-Cologne sets the goal of regulating activities in California to achieve the highest reasonable water quality. Three years after the enactment of Porter Cologne, Congress enacted the Federal Water Pollution Act Amendments of 1972, commonly referred to as the Clean Water Act (CWA).
Executive Orders related to the drought. Since July 2021, Governor Newsom has issued four executive orders in response to the drought: Executive Orders N-10-21, N-7-22, N-3-23, and N-4-23. On March 24, 2023, the Governor issued Executive Order N-5-23 to “terminate several operative provisions” “that are no longer needed in light of improving drought conditions.” Of the 81 operative provisions, 49 were terminated and 32 remain in effect. The remaining operative provisions include, among others:
- Directing the Water Boards to prioritize processing of applications for groundwater recharge projects, and suspending CEQA for such projects. (Executive Order N-7-22, Paragraph 12)
- Suspending CEQA for specified flood-related and state-supported recharge projects. (Executive Order N-7-22, paragraph 13)
- Facilitating the diversion of flood flows to accelerate groundwater recharge, under specified conditions that limit permissible diversions to those that do not harm water quality, habitat, or infrastructure. (Executive Order N-4-23, paragraphs 2-5,7)
Proposed Law:
This bill would require the SWRCB and regional water quality boards to use an approved regional habitat conservation plan or natural communities conservation plan, as specified, as a watershed plan for such aquatic resources, unless the permitting authority makes a written determination, based on substantial evidence in the record, that the HCP or NCCP does not substantially meet the definition of a watershed plan for such aquatic resources. It would also require DFW and the SWRCB, for water supply projects and flood risk reduction projects, to issue a final LSAA or take final action on water quality certifications issued pursuant to either Porter-Cologne or under the federal CWA, as applicable, within specific timeframes. Specifically, this bill would:
For the purposes of water qualify certifications:
- Require that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards as a watershed plan for those aquatic resources, unless the permitting authority makes a written determination, based on substantial evidence in the record, that the habitat conservation plan or natural communities conservation plan does not substantially meet the definition of a watershed plan for those aquatic resources.
- Require SWRCB and regional boards to implement the procedures, including provisions related to watershed plans, to address the impacts of dredge and fill activities from water supply and flood risk projects.
- Beginning on January 1, 2025, and annually thereafter, require SWRCB and regional boards to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report as specified.
For the purposes of LSAAs:
- Require DFW, for water supply projects and flood risk reduction projects subject to LSAAs whose project proponent submits a complete notification for the project activity and submits the certified or adopted environmental documentation for the activity, to issue a final agreement within 180 days of receiving a complete notification or within 90 days of receiving the certified or adopted environmental review document, as applicable. DFW and the project proponent can agree to extend this time period.
- If the department and project proponent are not able to reach a final agreement on all measures within that timeframe, the project proponent can proceed under a final agreement issued by an arbitration panel.
- Require, on or before January 1, 2025, and annually thereafter, DFW to report on the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to these provisions.
- Sunset these provisions on January 1, 2029.
Related Legislation:
SB 651 (Grove) would require CEQA-related challenges to projects that enhance the ability of the state or local agency to capture high precipitation events for local storage or recharge be decided by the courts within 270 days, if feasible.
AB 830 (Soria) would exempt from lake or streambed alteration agreement provisions temporary operation of existing infrastructure or temporary pumps being used to divert flood stage and monitor stage flows to beneficial groundwater recharge necessary to protect downstream life and property.
AB 1581 (Kalra) would exempt certain individuals, public agencies, universities, zoological gardens, and scientific or education institutions authorized to import, export, take, or possess any endangered species, threatened species, or candidate species for scientific, educational, or management purposes from the requirement to obtain a lake or streambed alteration agreement and instead requires these entities to submit to CDFW a written notification and copy of proposed environmental protection measures authorized by other agencies’ programmatic habitat restoration permits and guidance.
AB 1376 (Gray, 2021) would have prohibited the State Water Board from issuing a certificate or statement under federal water quality control laws until there is a 60-day public comment and review period for the certificate or statement and after that review period a majority of the members of the State Water Board vote on the certificate or statement. This bill was held in the Assembly Environmental Safety and Toxic Materials Committee.
AB 92 (Budget, Chapter 18, Statutes of 2020) allows the State Water Board to issue a water quality certification before the completion of the environmental review of the project.
AB 3005 (R. Rivas, 2020) would have expedited permitting and contracting requirements to facilitate the replacement of the Leroy Anderson Dam and Reservoir (Anderson Dam). Vetoed by the Governor.
-- END --
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Allen, Chair
2023 - 2024 Regular
Bill No: SB 23
Author: | Caballero | ||
Version: | 4/12/2023 | Hearing Date: | 4/26/23 |
Urgency: | No | Fiscal: | Yes |
Consultant: | Gabrielle Meindl | ||
SUBJECT: Water supply and flood risk reduction projects: expedited permitting
DIGEST: For water supply and flood risk reduction projects, requires the State Water Resources Control Board (State Water Board) and regional water quality control boards (regional boards), and the California Department of Fish and Wildlife (CDFW) to take final action on water quality certifications issued under the federal Clean Water Act or issue a final Lake and Streambed Alternation Agreement (LSAA), in specific timeframes and modifies the substantive standards applicable for those certifications and agreements.
ANALYSIS:
Existing law:
- Establishes the federal Clean Water Act (CWA) to regulate discharges of pollutants into the waters of the United States (U.S.) and to regulate quality standards for surface waters. (33 United States Code (U.S.C.) §1251 et seq.)
- Under section 401 of the CWA (Section 401), a federal agency may not issue a permit or license to conduct any activity that may result in any discharge into waters of the U.S. unless a section 401 water quality certification is issued, or certification is waived. States and authorized tribes where the discharge would originate are generally responsible for issuing water quality certifications. Certifications are intended to ensure the federally permitted activity complies with state water quality requirements and “any other appropriate requirement of state law.” (33 U.S.C. §1341)
- Under the Porter-Cologne Water Quality Control Act (Porter-Cologne), the State Water Board and the regional boards (collectively, Water Boards) are the principal state agencies with primary authority over water quality matters. (Water Code (WC) § 13000 et seq.)
This bill:
For purposes of water quality certifications,
- Requires the Water Boards to take final action on water quality certifications required under either Porter-Cologne or federal CWA within 180 days after receiving a complete application or 60 days after receiving final environmental documentation, whichever is later, if the project proponent:
- Requests a pre-application consultation at least 60 days before filing the application for certification.
- Files a complete application.
- Files a complete application or petition for all water rights approvals, or amendments necessary, to implement the flood risk reduction project or water supply project.
- Submits final environmental documentation to the Water Boards required by the California Environmental Quality Act (CEQA).
- Requires the Water Boards, within 30 days after the submittal of an application, to notify the project proponent whether the application is complete. If the application is incomplete, the Water Boards are required to provide the project proponent with written notification of all specific items that were complete and incomplete – and indicate how incomplete items can be made complete.
- Prohibits the Water Boards from requesting or requiring the project proponent to provide new or additional information not identified in the initial list of incomplete items.
- Deems the application complete if the Water Board does not provide the project proponent with written notification that includes complete and incomplete items within 30 days.
- Requires the project proponent, within 45 days of receiving notification of incomplete materials, to submit the supplemental materials or appeal the determination.
- Requires State Water Board or the regional board, within 30 days of receiving the supplemental materials, to determine if the application is now complete. Allows the Water Boards to only look at whether the re-submitted application includes the information specified in the prior notification of incompleteness.
- If the supplemented application is again determined to be incomplete, requires the Water Boards to provide the project proponent with a written notification specifying the parts of the supplemented application that are still incomplete and indicate how they can be made complete. If the Water Boards does not provide such written notification within 30 days of receiving the supplemented application, the application, as supplemented, is deemed complete.
- Requires the project proponent to act within 30 days by submitting additional supplemental materials or by appealing the notification of incompleteness.
- Authorizes the project proponent to petition the State Water Board to reconsider its determination of application completeness, or to appeal to the State Water Board any regional board’s determination of application completeness; and requires the Board to act on the petition or appeal within 60 days.
- Limits the Water Boards, when issuing water quality certifications, to measures included in an approved habitat conservation plan (HCP), natural communities conservation plans (NCCP), and habitat management plans (HMP) (collectively, approved plan), as specified, as the only mitigation measures that can be required in the water quality certification unless the Water Board determines the approved plan does not substantially meet the definition of a watershed plan.
- Requires the Water Boards to accept, as terms of the water quality certification, any avoidance, minimization, and compensatory mitigation required by the approved plan, for those impacts to the water of the state already addressed by the approved plan, if certain conditions are met. The Water Boards are not allowed to determine whether the mitigation measures are adequate or whether the permitted activity will comply with state water quality standards and other appropriate requirements of State law.
- Prohibits the Water Boards from imposing terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided under approved plans if certain conditions are met, including that the watershed plan addresses the project impacts to waters of the state, among others.
- Requires the Water Boards, in order to make a determination that an approved plan does not substantially meet the definition of a watershed plan, to make a proposed written determination, supported by specific written findings of insufficiency, for public review and comment, and provide written responses to the public comments received.
- Requires the State Water Board, by January 1, 2025, to act on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers (Army Corps) under the federal CWA within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. Requires the State Water Board, whenever possible, to rely on an environmental review completed by the Army Corps under the National Environmental Policy Act (NEPA) for compliance with CEQA if the environmental review complies with CEQA.
- Requires the Water Boards, commencing January 1, 2025, to annually prepare, provide public notice of, and make available for public review on their internet website, and provide to legislative policy and budget committees, a report with specified information, including water supply projects and flood risk reduction projects that have been issued water quality certifications.
- Sunsets these provisions on January 1, 2029.
For purposes of LSAAs,
1) Requires CDFW, for water supply projects and flood risk reduction projects subject to LSAAs whose project proponent submits a complete notification for the project activity and submits the certified or adopted environmental documentation for the activity, to issue a final agreement within 180 days of receiving a complete notification or within 60 days of receiving the certified or adopted environmental documentation, whichever is later. CDFW and the project proponent can agree to extend this time period.
2) If the department and project proponent are not able to reach a final agreement on all measures within that timeframe, the project proponent can proceed under a final agreement issued by an arbitration panel.
3) Sunsets these provisions on January 1, 2029.
Background
- Federal Clean Water Act (CWA). The Federal Water Pollution Control Act of 1948 was the first major U.S. law to address water pollution. The CWA establishes the basic structure for regulating discharges of pollutants into the waters of the U.S. and regulating quality standards for surface waters. Under the CWA, the U.S. Environmental Protection Agency (U.S. EPA) has implemented pollution control programs, set wastewater standards for industrial facilities, and set water quality standards for all contaminants in surface waters. The CWA made it unlawful to discharge any pollutant from a point source into navigable waters without a permit.
- Federal Clean Water Act Certification. Under Section 40, a federal agency may not issue a permit or license to conduct any activity that may result in any discharge into the waters of the U.S. unless a Section 401 water quality certification (401 certification) is issued, or certification is waived. The state where the discharge would originate is generally responsible for issuing water quality certifications.
Section 401 is an important tool for states to help protect the water quality of federally regulated waters by giving them the authority to grant, deny, or waive certification of proposed federal licenses or permits that may discharge into the waters of the U.S. When issuing a certification, the state certifies the activity complies with CWA requirements, and it can condition certification to provide reasonable assurance the activity will comply with federal requirements and other appropriate requirements of state law.
Some major federal licenses and permits subject to Section 401 include Federal Energy Regulatory Commission (FERC) licenses for hydropower facilities and natural gas pipelines. For projects regulated by FERC, Section 401 certifications are the only way the state can require the permitted activity to comply with state water quality standards and other appropriate requirements of state law, due to federal preemption under the Federal Power Act.
The CWA requires certifying authorities (i.e., states, authorized tribes, and U.S. EPA) to act on a Section 401 certification request "within a reasonable period of time (up to one year) after receipt" of such a request. A certifying authority may waive certification expressly, or by not acting in less than a year. In making decisions to grant, grant with conditions, or deny certification requests, certifying authorities consider whether the federally licensed or permitted activity will comply with applicable water quality standards, effluent limitations, new source performance standards, toxic pollutants restrictions, and other appropriate water quality requirements of state or tribal law.
Once the state issues its certification, it is up to the applicable federal entity to decide whether to issue a federal license or permit allowing the project to proceed. The federal government cannot issue a license or permit that requires a water quality certification until the state where the activity will occur has certified the project or waived its right to certify.
- 401 Water Quality Certification and Waste Discharge Requirements. The 401 Water Quality Certification and Wetlands Program is responsible for regulating discharges of dredged or fill material to the waters of the state. The Water Boards have the authority to regulate these discharges under Section 401 of the CWA and Porter-Cologne.
- Current application process. Applicants for a water quality certification must submit a complete application to the appropriate water board. Typically, applicants file with the water board at the same time that they apply for a dredge and fill permit with the Army Corps. For dredge and fill projects, the state’s Permit Streamlining Act (permit act) and applicable federal regulations establish the time-frame for the water boards to issue a certification. The permit act expedites Board action on these projects, while the federal regulations also apply to water quality certifications that require an Army Corps permit for dredge and fill discharges.
If a Water Board’s processing and review of the application will take more than one year, it may request additional time from the Army Corps or deny the application without prejudice, which allows the applicant to resubmit an application for the same project. This usually occurs when an applicant has not supplied the requested information or the project is complex and issues have not been resolved. Denial without prejudice is not a reflection on the project but rather a means to take meet the one-year time-frame to act when the applicant has failed to provide the required information. Once the Water Boards review the complete application and issues the water quality certification, the applicant may then obtain a permit from the Army Corps to conduct dredge and fill activities, after which it can start work on its project. - State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State. In 2001, the U.S. Supreme Court limited federal jurisdiction under the CWA when it determined in Solid Waste Agency of Northern Cook County v. U.S. Army Corps of Engineers (SWANCC), 531 U.S. 159 (2001), that certain “isolated” waters, including some wetlands and riparian areas, do not fall within the Army Corps’ interpretation of waters of the United States. Following the SWANCC decision, the State Water Board issued a memorandum stating the Porter-Cologne Act provides the regional boards with the authority to regulate any discharges of waste to waters that may no longer be subject to the Army Corps’ jurisdiction.
In 2008, the Water Board began conducting informal stakeholder meetings to develop wetland definitions and requirements. Following extensive public and stakeholder input, a revised draft regulation was issued in January 2019, after which Board staff held four workshops to address stakeholder concerns. Finally, in 2019, after more than a decade of work, the Board adopted a State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (Procedures). The Procedures represent a carefully negotiated compromise between water managers, agriculture, the conservation community, and business interests. They delineate processes for the submittal, review, and approval of applications for water quality certifications and waste discharge requirements for dredge or fill activities.
The Water Board adopted the Procedures to address: inconsistency across the Water Boards regarding discharges of dredged or fill material into waters of the state; Regional Boards having different requirements and levels of analysis when issuing water quality certifications; and regulations being inadequate to prevent losses in the quantity and quality of wetlands.
- Water Supply Strategy: Adapting to a Hotter, Drier Future. In August 2022, Governor Newsom outlined actions needed to increase the water supply and adapt to more extreme weather patterns caused by climate change. The “Water Supply Strategy: Adapting to a Hotter, Drier Future” calls for modernizing the state’s water system by investing in infrastructure to create new sources of water supply. The plan also sets specific goals for increasing the amount of water stored above and below ground, recycled and reused, and making new water available by capturing stormwater and desalinating ocean water and salty water in groundwater basins.
To advance the infrastructure and policies needed to adapt, the strategy asks the Legislature to streamline processes so projects can be planned, permitted, and built more quickly while protecting the environment.
Comments
- Purpose of Bill. According to the author, “The climate extremes California has been experiencing in recent years are unfolding a new pattern of drought and precipitation timeframes that we are ill adapt to respond to. With drought lasting years at a time, only to be interrupted by prolonged and potentially destructive rainfall, the need for water supply and flood protection infrastructure is evident. However, getting these critical, timely projects approved and built can be a significant challenge. The permitting process for these projects can be mired in delays caused by overlapping jurisdictions of state and federal agencies, confusion over what’s required for a completed application, and state agency and project applicant staffing issues. As described in Governor Newsom’s “Water Supply Strategy: Adapting to a Hotter, Drier Future”, streamlining permitting processes is a crucial next step for our state, so projects can be planned, permitted, and built more quickly, while still protecting the environment.
“SB 23 would provide comprehensive solutions to streamline a multitude of projects meant for various hydrological events. This bill will help accelerate recycled water, desalination, and stormwater capture projects so that these regions have access to a drought-proof sustainable supply of high-quality water, while also accelerating projects meant to provide flood control and respond to sea level rise. SB 23 identifies opportunities to improve and streamline the regulatory permitting process while preserving established environmental protections, so critical infrastructure projects are built at the pace and scale needed to prepare for climate change and protect families and businesses that are affected by the delays inherit in our current permit process.”
- Limits State’s authority to condition federal permits for water infrastructure projects. Section 401 of the CWA authorizes California to ensure all federal permits under the CWA comply with state water quality standards and other appropriate requirements of state law. However, SB 23 limits the state's authority to impose terms and conditions to ensure compliance with water quality standards and mitigate the adverse environmental impacts of proposed projects.
SB 23 allows alternative environmental documents to be used to "streamline" the process and cut down on "redundant" environmental reviews. The bill requires the Water Boards to use approved HCPs, NCCPs, and HMPs that include biological goals for aquatic resources in place of watershed plans unless the Water Board makes a certain finding. HCPs and NCCPs are landscape-level multi-species plans used for other purposes under the federal Endangered Species Act and the state Natural Community Conservation Planning Act. NCCPs and HCPs take a broad-based ecosystem approach, typically focused on habitat preservation and restoration, to planning for the protection and perpetuation of biological diversity.
By requiring the Water Boards to use these alternative plans, the bill precludes the use of other terms and conditions to minimize and mitigate impacts and ensure compliance with water quality standards in a certification, except under limited circumstances. The Water Boards would only be able to impose additional conditions if the impacts are not already addressed in one of the alternative plan – even if the measures are inadequate to ensure compliance with state water quality standards and other requirements of state law. If the Water Board finds the mitigation measures inadequate or that the project would violate state water quality standards, it may not have any recourse if the alternative plan substantially meets the definition of a watershed plan.
The bill's restriction on a Water Board's conditioning authority violates federal law. Under Section 401 of the CWA, a state issuing certification is required to determine there is reasonable assurance the activity will comply with water quality standards. Requiring the use of HCPs and NCCPs effectively limits what conditions the Water Boards can include in a certification, even when the certification would result in violations of state water quality standards.
- Importance of accurately interpreting Procedures. According to the sponsors, the intent is to codify Procedures (discussed above). However, while the Procedures authorize the Water Boards to use these alternative plans, the Water Boards are not required to use them. Moreover, the Procedures do not limit the permitting entity to avoidance, minimization, and mitigation measures contained in the alternative plan. The Procedures say the alternative plans can be used, but does not restrict Water Boards from imposing additional conditions, or supplementing those plans. In other words, under current law, the Procedures set a floor on what may be required, while the bill uses the Procedures as a ceiling on what may be required. This is one reason why the Procedures are consistent with the federal CWA but this bill is not.
Further, the Procedures only apply to dredge and fill permits, whereas Section 401 certifications apply to any federal permit under the CWA. The Procedures were not intended to address the primary concerns involved with other types of activities that may be subject to water quality certification, such as permitting hydroelectric facilities or federal permits for point source discharges of pollution.
Given these issues, the Committee may wish to:
- Delete Section 13389.3 (a) (2-3), (b), and (c) to instead direct the State Boards to implement Procedures, including provisions related to watershed plans, to address the impacts of dredge and fill activities from water supply and flood risk projects; and
- Modify the bill’s intent language to more accurately reflect the Procedures as follows:
On April 2, 2019, the state board adopted the “State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State” (procedures) that requires that any regional habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards as a watershed plan for such aquatic resources, unless the permitting authority makes a written determination, based on substantial evidence in the record, that the HCP or NCCP does not substantially meet the definition of a watershed plan for such aquatic resources.
- General Nationwide Permits (NWP). Under the CWA, the Army Corps can issue general permits to authorize activities that have minimal adverse environmental effects. An NWP is a general permit that authorizes activities across the country and the Army Corps can ask the State Water Board to adopt specific NWPs. The Board determines if the NWPs would ensure compliance with state water quality standards and other appropriate state laws before approving an NWPs.
In 2021, the State Water Board conditionally approved 18 NWPs but rejected 39 other NWP permit applications because it could not certify the 39 would be consistent with state water quality requirements and other state laws. However, this denial does not preclude an applicant from submitting a new or separate project-specific certification request.
This bill requires the Board to proactively revisit all of the NWPs it already rejected. It is not clear how this would work since the role of the State Water Board is to review submitted applications. It should be noted that the Army Corps is not expected to resubmit NWPs for the State Water Board to consider until 2026.
Since the Board has already acted upon the NWPs and applicants can simply submit a new application if they disagree with the Board’s decision, the Committee may wish to delete this provision contained in Section 13389.3 (d). - Conforming amendments. “Final” environmental review documents under CEQA are either certified or adopted. To clarify what is meant by “final environmental documentation” as it relates to the LSAA provisions, the SNR&W Committee amended the bill to refer to environmental documents that have been “certified or adopted.”
The Committee may wish to amend the bill to make similar changes to the Water Board provisions for Section 401 environmental review documents and extend to the time for the Water Boards to take final action on a project certification in the same provision from “60” to “90” days.
- Other minor amendments.
- Limit the definition of “project certifications” to water quality certifications required under Section 13160.
- Under the definition of “water supply project,” clarify that “water treatment facility” is limited to “drinking water treatment facility.”
- Committee amendments. Staff recommends the committee adopt the bolded amendments contained in Comments 3, 4, 5, and 6 above.
DOUBLE REFERRAL:
This measure was heard in the Senate Natural Resources and Water Committee on April 11, 2023, and passed out of committee with a vote of 10-0.
Related/Prior Legislation
SB 651 (Grove) requires CEQA-related challenges to projects that enhance the ability of the state or local agency to capture high precipitation events for local storage or recharge be decided by the courts within 270 days, if feasible. SB 651 is set to be heard in this committee on April 26, 2023.
AB 1376 (Gray, 2021) would have prohibited the State Water Board from issuing a certificate or statement under federal water quality control laws until there is a 60-day public comment and review period for the certificate or statement and after that review period a majority of the members of the State Water Board vote on the certificate or statement. This bill was held in the Assembly Environmental Safety and Toxic Materials Committee.
AB 92 (Budget, Chapter 18, Statutes of 2020) allows the State Water Board to issue a water quality certification before the completion of the environmental review of the project.
AB 3005 (R. Rivas, 2020) would have expedited permitting and contracting requirements to facilitate the replacement of the Leroy Anderson Dam and Reservoir (Anderson Dam). Vetoed by the Governor.
SOURCE:
Association of California Water Agencies (ACWA)
SUPPORT:
Agricultural Council of California
Amador Water Agency
American Pistachio Growers
Bay Area Council
Bella Vista Water District
Bellflower Somerset Mutual Water Company
Caldesal
California Alliance for Jobs
California Building Industry Association (CBIA)
California Central Valley Flood Control Association
California Chamber of Commerce
California Citrus Mutual
California Council for Environmental & Economic Balance (CCEEB)
California Date Commission
California Farm Bureau Federation
California Fresh Fruit Association
California Municipal Utilities Association (CMUA)
California Special Districts Association
California State Association of Counties (CSAC)
California Strawberry Commission
Calleguas Municipal Water District
Carmichael Water District
Citrus Heights Water District
City of Santa Rosa
Coachella Valley Water District
Coastside County Water District
County of Humboldt
County of Monterey
Cucamonga Valley Water District
Desert Water Agency
Eastern Municipal Water District
El Dorado Irrigation District
Elsinore Valley Municipal Water District
Florin Resource Conservation District/elk Grove Water District
Foothill Municipal Water District
Fresno Metropolitan Flood Control District
Habitat for Humanity, Merced/Stanislaus County
Hidden Valley Lake Community Services District
Humboldt Bay Municipal Water District (HBMWD)
Indian Wells Valley Water District
Irvine Ranch Water District
Kings River Conservation District
Laguna Beach County Water District
Mckinleyville Community Services District
Mesa Water District
Midpeninsula Regional Open Space District
Modesto Irrigation District
Monterey Peninsula Water Management District
Nisei Farmers League
North Marin Water District
Olivenhain Municipal Water District
Orange County Water District
Orchard Dale Water District
Padre Dam Municipal Water District
Pajaro Valley Water Management Agency
Palmdale Water District
Placer County Water Agency
Puente Basin Water Agency
Rancho California Water District
Regional Water Authority
Rowland Water District
San Bernardino Valley Municipal Water District
San Diego County Water Authority
San Joaquin Council of Governments
San Juan Water District
San Luis Delta-mendota Water Authority
Santa Clara Valley Habitat Agency
Santa Clara Valley Water District
Santa Fe Irrigation District
Solano County Water Agency
Southern California Water Coalition
State Water Contractors
Stockton East Water District
Tahoe City Public Utility District
Three Valleys Municipal Water District
Tuolumne County Water Agency
Tuolumne Utilities District
Turlock Irrigation District
United Water Conservation District
United Way of Merced County
Upper San Gabriel Valley Municipal Water District
Utica Water and Power Authority
Valley Ag Water Coalition
Valley Center Municipal Water District
Valley Onward
Vista Irrigation District
Walnut Valley Water District
Water Replenishment District of Southern California
Western Growers Association
Western Municipal Water District
Western Plant Health Association
OPPOSITION:
California Environmental Voters (formerly CLCV)
California Trout
Clean Water Action
Community Water Center
Defenders of Wildlife
Environmental Law Foundation
Friends of The River
Golden State Salmon Association
Institute for Fisheries Resources
Leadership Counsel for Justice & Accountability
Los Angeles Waterkeeper
Mono Lake Committee
National Resources Defense Council
Pacific Coast Federation of Fishermen's Associations
Restore the Delta
San Francisco Baykeeper
Sierra Club California
Silicon Valley Youth Climate Action
Trout Unlimited
Union of Concerned Scientists
ARGUMENTS IN SUPPORT:
According to a coalition letter from water agencies, “California faces a range of water management challenges, including droughts, floods, and other natural disasters. While our weather patterns have always been variable, climate change has, and will continue to exacerbate the weather whiplash that is intensifying drought and precipitation events. Addressing these challenges requires a coordinated effort between state and local agencies to construct and maintain water infrastructure projects needed in a 21st century climate. Unfortunately, the current permitting process for water infrastructure projects in California is complex and lengthy, and can be a significant barrier to progress in expanding and improving our water supply and flood risk reduction systems. This can result in delays, higher project costs, and uncertainty for communities, agricultural interests, and businesses that rely on a reliable and sustainable water supply. In addition, this can result in worse environmental outcomes, delaying projects that provide important benefits to aquatic and natural resources.
“SB 23 would help address these issues by identifying opportunities to improve and streamline the regulatory permitting process, without shortcutting environmental reviews, so these critical infrastructure projects are built at the pace and scale needed to prepare for climate change. SB 23 would address inefficiencies in the application review process and ensure project proponents and state agencies are meeting reasonable deadlines and moving applications forward in an expeditious manner.”
ARGUMENTS IN OPPOSITION:
According to a coalition letter from environmental organizations, “We write to express our opposition to SB 23, which removes critical protections for communities from impacts of water supply and flood projects and inhibits our progress in fulfilling the Human Right to Water. While developing projects faster is a worthy goal, it cannot come at the expense
of public health.
“SB 23 would limit review of permits for water quality to only 180 days for water supply or flood risk reduction projects, after which they are deemed approved. This limits the ability of the State and Regional Water Quality Control Boards to be able to fulfill their mission to protect water quality for public health and other beneficial users of water. Many of these applications could be long, complicated, or misleading, necessitating additional analysis that could easily take longer
than the 180-day window in this bill. For example, a recent groundwater recharge project on Mariposa Creek in Merced County merely proposed recharge on agricultural land and was approved by the Department of Water Resources and State Board. Only after further investigation by the Regional Board was it discovered that the project was proposing to recharge on dairy lands, threatening to contaminate groundwater used for drinking water with nitrate contamination. Effective permitting requirements should not be waived to save an application a few months when the consequence could be decades of contamination for communities.”
-- END --
SENATE COMMITTEE ON NATURAL RESOURCES AND WATER
Senator Dave Min, Chair
2023 - 2024 Regular
Bill No: SB Hearing Date: April 11, 2023
Author: | Caballero | ||
Version: | March 30, 2023 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Genevieve Wong | ||
Subject: Water supply and flood risk reduction projects: expedited permitting
BACKGROUND AND EXISTING LAW
Background on the Lake and Streambed Alteration Program. The Lake and Streambed Alteration Program (Fish and Game Code (FGC) §§ 1602 et. seq.) requires any person, state or local governmental agency, or public utility to notify the California Department of Fish and Wildlife (CDFW) before beginning any activity that may do any of the following:
- Divert or obstruct the natural flow of any river, stream, or lake;
- Change the bed, channel, or bank of any river, stream, or lake;
- Use material from any river, streak, or lake; or
- Deposit or dispose of material into any river, stream, or lake.
Once CDFW receives the notification, CDFW determines whether the notification is complete. If the notification is deemed incomplete, CDFW contacts the notifying entity and informs them what information must be provided to make it complete. Once a notification is deemed complete, CDFW determines if the project described in the notification will substantially alter a river, stream, or lake. If CDFW determines that the project will not substantially alter a river, stream, or lake, CDFW provides written verification of that fact and the entity may conduct that activity as described in the notification.
If CDFW determines that the activity, as described in the notification, would substantially alter a river, stream, or lake, and that it may substantially adversely affect existing fish or wildlife resources, a Lake or Streambed Alteration Agreement (LSAA) is required. An LSAA is a type of permit that includes mitigation measures necessary to protect fish and wildlife resources. Before issuing an LSAA, a project must have completed a California Environmental Quality Act (CEQA) analysis. Emergency work, such as those necessary to protect life or property, do not require an LSAA.
This law was first enacted in 1970, reenacted in 1976, and amended in 2003, but the purpose of the law has never changed. The law declares, “The protection and conservation of the fish and wildlife resources of this state are of utmost public interest. Fish and wildlife are the property of the people and provide a major contribution to the economy of the state, as well as providing a significant part of the people’s food supply; therefore their conservation is a proper responsibility of the state.” (FGC §1600)
State and federal regulatory authority over water quality. The Porter-Cologne Water Quality Control Act (Porter-Cologne), enacted in 1969, vests the State Water Resources Control Board (SWRCB) with ultimate authority over state water quality policy. The regional water quality control boards (regional boards) oversee water quality at the local level. Collectively, these are known as the “Water Boards.” Porter-Cologne sets the goal of regulating activities in California to achieve the highest reasonable water quality. Three years after the enactment of Porter Cologne, Congress enacted the Federal Water Pollution Act Amendments of 1972, commonly referred to as the Clean Water Act (CWA).
Federal Clean Water Act certification. Under Section 401 of the CWA (Section 401), a federal agency may not issue a permit or license to conduct any activity that may result in any discharge into waters of the United States unless a Section 401 water quality certification (401 certification) is issued, or certification is waived. States where the discharge would originate are generally responsible for issuing water quality certifications. Section 401 is an important tool for states to help protect the water quality of federally regulated waters within their state borders, in collaboration with federal agencies. It gives states the authority to grant, deny, or waive certification of proposed federal licenses or permits that may discharge into waters of the United States. In essence, it authorizes the state to ensure that all federal permits issued under the CWA comply with state law. Some major federal licenses and permits subject to Section 401 include Federal Energy Regulatory Commission licenses for hydropower facilities and natural gas pipelines.
401 Water Quality Certification and Wetlands Program. This program is responsible for regulating discharges of dredged or fill material into waters of the state. Pursuant to Section 401, the Water Boards have authority to issue 401 certifications to applicants for a federal license or permit for activities that may result in a discharge into the waters of the United States, including, but not limited to, the discharge of dredged or fill material. For discharges into waters of the state, authority is provided under Porter-Cologne.
On April 2, 2019, SWRCB adopted the State Wetland Definition and Procedures for the Discharge of Dredged or Fill Material to Waters of the State (Procedures). The Procedures consist of four major elements: (1) a wetland definition; (2) a framework for determining if a wetland feature is a water of the state; (3) wetland delineation procedures; and (4) procedures for submittal, review, and approval of applications for Water Quality Certifications and Waste Discharge Requirements for dredge or fill activities. The Procedures were adopted to address several important issues: (1) a need to strengthen protection of waters of the state that were no longer protected under the CWA due to US Supreme Court decisions; (2) there was inconsistency across the Water Boards in requirements for discharges of dredged or fill materials into waters of the state, including wetlands; (3) there was no single accepted definition of wetlands at the state level and the Water Boards historically had different requirements and levels of analysis regarding issuance of water quality certification; and (4) regulations have historically not been adequate to prevent losses in the quantity and quality of wetlands in California, where there have been especially profound historical losses of wetlands.
Applicants proposing to discharge dredged or fill material are required to comply with the Procedures unless an exclusion applies.
Executive Order N-5-23. Since July 2021, Governor Newsom has issued four executive orders in response to the drought: Executive Orders N-10-21, N-7-22, N-3-23, and N-4-23. On March 24, 2023, the Governor issued Executive Order N-5-23 to “terminate several operative provisions” “that are no longer needed in light of improving drought conditions.” Of the 81 operative provisions, 49 were terminated and 32 remain in effect. The remaining operative provisions include, among others:
- Directing the Water Boards to prioritize processing of applications for groundwater recharge projects, and suspending CEQA for such projects. (Executive Order N-7-22, Paragraph 12)
- Suspending CEQA for specified flood-related and state-supported recharge projects. (Executive Order N-7-22, paragraph 13)
- Facilitating the diversion of flood flows to accelerate groundwater recharge, under specified conditions that limit permissible diversions to those that do not harm water quality, habitat, or infrastructure. (Executive Order N-4-23, paragraphs 2-5,7)
Existing Law:
- Requires an entity to notify CDFW before commencing any activity that may substantially alter a streambed. (FGC §1602)
- CDFW may enter into Lake and Streambed Alteration Agreements, which permit activities that alter a streambed if reasonable measures to protect fish and wildlife resources are included.
- The federal Clean Water Act makes it unlawful to discharge any pollutant from a point source into navigable waters without a permit; and establishes a structure for regulating discharges of pollutants into the waters of the United States and regulating quality standards for surface waters.
- Designates SWRCB as the state water pollution control agency for purposes of the Federal Clean Water Act and authorizes SWRCB to issue a certificate or statement under the federal act that there is reasonable assurance that an activity of a person subject to the jurisdiction of the state board will not reduce water quality below applicable standards. (Water Code (Wat. C.) §13160)
- Porter-Cologne establishes the SWRCB and regional water quality control boards to preserve, enhance, and restore the quality of California’s water resources and drinking water for the protection of the environment, public health, and all beneficial uses, and to ensure proper water resource allocation and efficient use for the benefit of present and future generations.
- Requires a person discharging waste, or proposing to discharge waste, within any region that could affect the quality of the waters of the state, to file with the appropriate regional board a report of the discharge. (Wat. C. §13260(a))
PROPOSED LAW
This bill requires CDFW and the Water Boards, for water supply projects and flood risk reduction projects, to issue a final LSAA or take final action on water quality certifications issued pursuant to either Porter-Cologne or under the federal CWA, as applicable, within specific timeframes. Specifically:
For purposes of LSAAs,
- Requires CDFW, for water supply projects and flood risk reduction projects subject to LSAAs whose project proponent submits a “complete notification” for the project activity and submits final environmental documentation for the activity, to issue a final agreement within 180 days of receiving a complete notification or within 60 days of receiving final environmental documentation, whichever is later. Authorizes CDFW and the project proponent to agree to extend this period.
- Authorizes, if CDFW and the project proponent are not able to reach a final agreement on all measures within that timeframe, the project proponent to proceed in accordance with a final agreement issued by an arbitration panel.
For purposes of water quality certifications,
- Requires the Water Boards to take final action on a water quality certification required pursuant to either Porter-Cologne or federal CWA within 180 days after receiving a complete application or 60 days after receiving final environmental documentation, whichever is later, if the project proponent does all of the following:
- Requests a preapplication consultation. The project applicant is required to initiate the preapplication consultation at least 60 days before the filing of the application of certification.
- Files a complete application for project certification.
- Files a complete application or petition for all water rights approvals, or amendments necessary, to implement the flood risk reduction project or water supply project.
- Submits final environmental documentation to the Water Boards required by CEQA.
- Requires the Water Boards, within 30 days after the submittal of an application or petition, to notify the project proponent whether the application is complete. If the application is incomplete, the Water Boards are required to provide the project proponent with written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete.
- Prohibits the Water Boards from requesting or requiring the project proponent to provide new or additional information that was not identified in the initial list of incomplete items.
- Deems the application or petition complete if the Water Board does not provide the project proponent with written notification that includes complete and incomplete items within 30 days.
- Requires the project proponent, within 45 days of receiving a notification of incomplete materials, to submit the supplemental materials or appeal the determination.
- Requires SWRCB or the regional board, within 30 days of receiving the supplemental materials, to determine the completeness of the application or petition with the supplemental materials, and whether to issue the notification of a complete application. Limits the Water Boards determination to whether the application or petition includes the information specified in the prior notification of incompleteness when determining whether to issue this notice.
- If the supplemented application or petition is again determined to be incomplete, requires the Water Boards to provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete. If the Water Boards does not provide such written notification within 30 days of receiving the supplemented application or petition, the application or petition, as supplemented, is deemed complete.
- Requires the project proponent to act within 30 days by submitting additional supplemental materials or by appealing the notification of incompleteness.
- Authorizes the project proponent to petition SWRCB to reconsider a SWRCB-determination of application completeness, or to appeal to SWRCB any regional board’s determination of application completeness; and requires SWRCB to act on the petition or appeal within 60 days.
- Requires the Water Boards, when issuing water quality certifications, to use an approved habitat conservation plan, natural communities conservation plan, or habitat management plan (collectively, approved plan), as specified, as a watershed plan unless the Water Board determines that the approved plan does not substantially meet the definition of a watershed plan.
- Requires the Water Boards to accept, as terms of the water quality certification, any avoidance, minimization, and compensatory mitigation required by the approved plan, for those impacts to waters of the state already addressed by the approved plan, if certain conditions are met.
- Prohibits the Water Boards from imposing terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans if certain conditions are met, including the watershed plan addresses the project impacts to waters of the state, among others.
- Requires the Water Boards, in order to make a determination that an approved plan does not substantially meet the definition of a watershed plan, to make a proposed written determination, supported by specific written findings of insufficiency, for public review and comment and provide written responses to the public comments received.
- Requires SWRCB, by January 1, 2025, to adopt general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers (Army Corps) under the federal CWA within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. Requires SWRCB to rely on an environmental review completed by the Army Corps under the National Environmental Policy Act (NEPA) for compliance with CEQA.
- Requires the Water Boards, commencing January 1, 2025, to annually prepare, provide public notice of, and make available for public review on their internet website, and provide to legislative policy and budget committees, a report with specified information, including water supply projects and flood risk reduction projects that have been issued water quality certifications.
ARGUMENTS IN SUPPORT
According to the author, “The climate extremes California has been experiencing in recent years are unfolding a new pattern of drought and precipitation timeframes that we are ill adapt to respond to. With drought lasting years at a time, only to be interrupted by prolonged and potentially destructive rainfall, the need for water supply and flood protection infrastructure is evident. However, getting these critical, timely projects approved and built can be a significant challenge. The permitting process for these projects can be mired in delays caused by overlapping jurisdictions of state and federal agencies, confusion over what’s required for a completed application, and state agency and project applicant staffing issues. As described in Governor Newsom’s “Water Supply Strategy: Adapting to a Hotter, Drier Future”, streamlining permitting processes is a crucial next step for our state, so projects can be planned, permitted, and built more quickly, while still protecting the environment. SB 23 would provide comprehensive solutions to streamline a multitude of projects meant for various hydrological events. This bill will help accelerate recycled water, desalination, and stormwater capture projects so that these regions have access to a drought-proof sustainable supply of high-quality water, while also accelerating projects meant to provide flood control and respond to sea level rise. SB 23 identifies opportunities to improve and streamline the regulatory permitting process, while preserving established environmental protections, so critical infrastructure projects are built at the pace and scale needed to prepare for climate change, and protect families and businesses that are affected by the delays inherit in our current permit process.”
The Association of California Water Agencies, sponsor of the bill, writes that “the current permitting process can be slow and cumbersome, delaying important projects that are crucial to protecting our communities and natural resources,” and that “SB 23 would create a clear and predictable timeline for obtaining Lake and Streambed Alteration Agreements and section 401 water quality certifications.”
ARGUMENTS IN OPPOSITION
A coalition letter submitted by groups including Community Water Center, Sierra Club California, Leadership Counsel of Justice & Accountability, among others, writes that SB 23 “limits the ability of the State and Regional Water Quality Control Boards to be able to fulfill their mission to protect water quality for public health and other beneficial uses of water. Many of these applications could be long, complicated, or misleading; necessitating additional analysis that could easily take longer than the 180-day window … [and] it is insufficient to suggest that completed environmental review is sufficient protection for a community. Many of these projects could be exempted from [CEQA], ministerially permitted by land use agencies, or simply go unnoticed by state permitting agencies. As such, we need both environmental review and water quality permitting by the State and Regional Boards to fully protect water quality.” The letter also expresses concern about allowing entities to “pay more to receive more attention from permitting agencies” and how it will “affect the workload of the State and Regional Water Boards. Our organizations have made significant progress to have the State Water Board prioritize disadvantaged communities” and “if the State and Regional Boards were forced to prioritize projects for wealthier communities that could just offer more money, projects for disadvantaged communities would have to go to the back of the line, furthering environmental injustice.”
Another coalition letter, including the Natural Resources Defense Council, Defenders of Wildlife, Clean Water Action, and Pacific Coast Federation of Fishermen’s Associations, Institute for Fisheries Resources, among others, writes, “as currently drafted, SB 23 would undermine effective permitting of water infrastructure, weakening substantive provisions of State law and establishing unworkable deadlines and limitations on the permitting process. In short, this bill sets up a permitting system that could result in shoddy projects that threaten public health and safety and the environment at a time when it is essential that projects are designed to further climate resilience and not undermine it. Further, instead of speeding up projects, this bill will only further delay projects with conflict, controversy and litigation.” The letter goes on to state that, “SB 23 undermines the State’s wetlands policy. For instance, the bill mandates that that State approve general orders issued by the Army Corps of Engineers, regardless of whether those general orders are consistent with California law and policy, and it requires the State to rely on analyses prepared by the Army Corps under NEPA. The State Water Board already has the authority to approve nationwide permits issued by the Army Corps, but in 2020 the State Water Board rejected approval of 39 of the Army Corps’ nationwide permits because they did not assure compliance with state law, and imposed additional conditions on others to ensure compliance with State law. Moreover, while the State’s wetlands policies and procedures establish minimum requirements for dredge and fill permits, SB 23 seeks to codify these minimum requirements as the maximum allowed by law.
COMMENTS
Double referral. This bill is double referred with the Senate Environmental Quality Committee, with this committee being the committee of first referral. Elements of this bill under the jurisdiction of the Senate Environmental Quality Committee are included here for context and completeness only and will be discussed before that committee. Specifically, the Water Boards’ processes for issuing water quality certifications will likely be covered.
One size fits all. SB 23 imposes specific timeframes in which CDFW must issue final LSAAs for flood risk reduction projects and water supply projects and requires Water Boards to take final action on water quality certifications within specific timeframes for those same type of projects when the project proponent has requested a preapplication consultation. The timeframes apply regardless of size or complexity. “Flood risk reduction projects” could include major flood management projects such as those that are underway in the Mossdale Tract. “Water supply projects” could include desalination plants, the SITES Reservoir, dam spillway projects, enlarging existing reservoirs, groundwater recharge projects, and the Delta Conveyance project. The purpose of having such a broad application, according to the sponsors, is to promote diversity in how the state gets water.
The broader the application, the greater the impact this bill could have on CDFW and the Water Boards and their ability to adequately process LSAAs and water quality certifications in accordance with the bill’s mandated timeframes. SB 23 could impact the management of fish and wildlife resources and water quality throughout the state. The amount of time it may take for CDFW to issue a final LSAA or Water Boards to take final action on a water quality certification can vary from project to project; the more complex the project, the more likely a longer process is involved. Each project is unique and the CDFW and Water Boards are required to consider the individual circumstances of each project – whether it be size, project type, location of the state, or hydrological conditions. It could apply to projects that impact the fish and wildlife and water quality of the Delta, Klamath River, Salinas River, Lake Tahoe, and Lake Elsinore, among others. Because it is hard to identify the universe of projects that could be subject to the bill, and it is unknown how many projects could be before either CDFW or the Water Boards at any given moment, it is also difficult to evaluate the impact these new processes will have on CDFW and the Water Boards. What kind of domino effect could these expedited timeframes have on other responsibilities and duties of CDFW and the Water Boards? Could other projects be pushed to the back of the line and delayed?
The author may wish to consider narrowing the scope of flood risk reduction projects and water supply reduction projects.
Blank check. While the bill requires the Water Boards to report to the Legislature certain information relating to water quality certifications issued for flood risk reduction projects and water supply projects, similar reporting is not required for LSAAs. To provide the Legislature with a better idea of the types of projects utilizing the bill’s expedited processes for LSAAs, the committee may wish to amend the bill to require CDFW, commencing January 1, 2025, and annually thereafter, to submit a similar report for LSAAs. (See Amendment 1)
Existing LSAA processes. Existing law already imposes specific timeframes for the issuance of LSAAs. Within 60 days after notification is complete, CDFW is required to provide a draft agreement to the entity, which describes the fish and wildlife resources that may be substantially and adversely affected and includes measures to protect those resources. If CDFW does not issue a draft agreement to the entity within 60 days from the date notification is deemed complete, the entity may conduct the activity described in the notification, including any measures in the notification intended to protect fish and wildlife.
If a draft agreement is issued, the entity, within 30 days of receiving the draft agreement, is required to notify CDFW whether the mitigating measures are acceptable. If the measures are not acceptable, the entity is required to notify the department and specify which measures are not acceptable. If requested, CDFW is required to meet with the entity within 14 days of the request to resolve any disagreements regarding those measures. If the entity fails to respond within 90 days of receiving the draft agreement, CDFW may withdraw the agreement and may require the entity to resubmit a notification.
If mutual agreement is not reached, the entity may request that a panel of arbitrators resolve the disagreement. The panel is required to issue a decision within 14 days and is binding on CDFW and the entity.
SB 23, in addition to the already established timeframes, would require CDFW to issue a final LSAA either within 180 days of receiving a complete notification from the project proponent or within 60 days of receiving final environmental documentation, whichever is later.
Essentially, SB 23 puts a time limit between when an LSAA “complete” notification or CEQA documentation is submitted and when CDFW is required to issue a final LSAA. If the final LSAA is not issued, the project proponent can proceed to arbitration.
Under current LSAA processes, the entity may request arbitration at any point if mutual agreement is not reached pursuant to a requested meeting (FGC §1603(b)).
The main objective of this bill is to decrease delay that some of the larger water supply projects and flood risk reduction projects encounter. According to CDFW’s website, some causes of delay in issuing LSAAs include the following:
- Project description in the notification is incomplete or applicant requests changes.
- Insufficient project planning.
- Notification fees are calculated incorrectly.
- Notification did not identify all projects or activities.
- CEQA review has not been completed or does not address all activities or impacts for issuance of an agreement.
- Notification does not adequately address project impacts.
- Notification does not propose measures to protect fish, wildlife, and plant resources, or compensatory mitigation when applicable.
- Draft agreement is not signed and returned promptly by the applicant.
- Person other than the Applicant or Authorized Designed Representative signs the notification or agreement.
- Notification is sent to the wrong CDFW regional office.
Given that current processes require CDFW to issue draft LSAAs within a certain timeframe, an entity has the ability to request arbitration if an agreement cannot be reached pursuant to any requested meeting, and the common causes for delay, it is unclear if this bill would help solve the LSAA issue the author seeks to address.
The importance of being complete. Under the current LSAA program, CDFW determines whether the notification is complete. However, SB 23’s requirement that a project proponent “submit a complete notification” has caused some confusion on when the notification is deemed complete and who makes that determination. Is the notification deemed complete when determined by CDFW, as under existing law? Or is the notification complete when the project proponent submits the notification with all the specified, required documents? It is also unclear if CDFW can ask for additional information once they receive the initial notification.
According to the sponsors, SB 23 is not intended to change these existing processes. Because FGC §1602(a)(1)(F) requires the notification to include “any other information required by the department,” CDFW may ask for additional information even after receiving the notification. To provide clarity and better effectuate the author’s intent, the committee may wish to amend the bill to specify that CDFW determines whether a notification is complete. (See Amendments 2).
Further, “final” environmental review documents under CEQA are either certified or adopted. To clarify what is meant by “final environmental documentation,” the committee may wish to amend the bill to refer to environmental documents that have been certified or adopted. (See Amendments 3 & 4)
The author may consider making similar changes to the Water Board provisions.
Not shortcutting, substituting. SB 23 provides for the substitution of different types of environmental documents in attempts to “streamline” and cut down on “redundant” environmental review in two situations. First, when the Water Boards are issuing water quality certifications, the Water Boards are required to use approved habitat conservation plans (HCPs), natural communities conservation plans (NCCPs), and habitat management plans (HMPs) that include biological goals for aquatic resources (collectively, approved plans) in the place of watershed plans unless the Water Board makes a certain finding. HCPs and NCCPs are landscape level multi-species plans that are authorized and permitted pursuant to the federal Endangered Species Act, the California Endangered Species Act, and the state’s Natural Community Conservation Planning Act. NCCPs and HCPs take a broad-based ecosystem approach to planning for the protection and perpetuation of biological diversity while allowing for the incidental take of endangered species in the course of otherwise legal activities, such as land development projects.
Second, when adopting general water quality certifications that are issued by the Army Corps, SWRCB is required to rely on the environmental review completed by the Army Corps under NEPA for its compliance with CEQA. Both of these substitutions apply for any water quality certifications, both pursuant to Porter-Cologne or federal CWA, and not just certifications for flood risk reduction projects and water supply projects.
That’s what the Procedures said. SB 23 requires the Water Boards to use the “approved plans” instead of a watershed plan when issuing a water quality certification unless the Water Board makes a determination, in writing, that the approved plan does not substantially meet the definition of a watershed plan. Accordingly, the Water Boards are also required to accept, as terms of water quality certification, any avoidance, minimization, and compensatory mitigation required by the approved plan for those water impacts.
According to the sponsors, and the bill’s findings and declarations, these provisions are based on the Procedures that SWRCB adopted in April 2019. The intent was to codify the processes in the Procedures. Proposed Wat. C. §13389.3(a)(2) asserts that “The procedures further require that the state water board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.”
This compares to Page 19, lines 629-637of the Procedures, which reads:
“The permitting authority may approve the use of other plans, including for example, Habitat Conservation Plans (HCPs), Natural Community Conservation Plans (NCCPs), or municipal stormwater permit watershed management programs as watershed plans, if they substantially meet the stated above. Any NCCP approved by the California Department of Fish and Wildlife before December 31, 2020, and any regional HCP approved by the United States Fish and Wildlife Service before December 31, 2020, which includes biological goals for aquatic resources, shall be used by the permitting authority as a watershed plan for such aquatic resources, unless the permitting authority determines in writing that the HCP or NCCP does not substantially meet the definition of a watershed plan for such aquatic resources.” (Emphasis added)
While the Procedures authorize the Water Boards to use the approved plans as watershed plans, it is not required. The Procedures only require the use certain NCCPs approved by CDFW before December 31, 2020, and certain HCPs approved by USFW before December 31, 2020, unless it is determined, in writing, that the HCP or NCCP does not substantially meet the definition of a watershed plan. Additionally, the Procedures do not limit the permitting entity to what is contained in the approved plan. The Procedures say that the approved plans can be used, or in limited circumstances, mandate its use, but do not restrict the Water Boards from imposing additional conditions, or supplementing it.
Putting the differences between what the Procedures say versus what SB 23 requires aside, the requirement to use the approved plans gives rise to a number of questions:
- What does it mean to “substantially meet”? If the Water Boards finds that an approved plan does not substantially meet the definition of a watershed plan, it is not limited to using the plan and any of its avoidance, minimization, and compensatory mitigation. Determining whether something “substantially meets” something can be vague and is often characterized as an “I know it when I see it” situation. In this case, however, could such a vague term open the door to litigation? Could this potentially delay the issuance of water quality certifications, the very purpose for which this bill is being sought?
- What does that mean? SB 23 prohibits the Water Boards from imposing additional conditions that would avoid, minimize, or provide compensatory mitigation for impacts to waters other than those conditions that are in the approved plan if the watershed plan meets certain conditions.
If watershed plans, in this case, are being substituted with approved plans, the question is – what watershed plan?
- When can the Water Boards impose additional conditions not in an approved plan? SB 23 allows for the Water Boards to impose additional conditions not in an approved plan only if the impacts that the conditions would address are not already addressed in the approved plan. However, if the approved plan does contain any avoidance, minimization, or compensatory mitigation for those impacts, the Water Board is restricted to using those measures. This restriction applies even if the measures are inadequate. If the Water Board finds the mitigation measures inadequate, its only recourse would be to make a finding that the approved plan does not substantially meet the definition of a watershed plan.
As noted above, nothing in the Procedures restricts the Water Boards from imposing additional conditions that are not in an approved plan. The Procedures provide that the Water Board may use the approved plans, but does not prohibit the Water Boards from supplementing it. Thus, if an approved plan addresses a particular water impact, but the mitigation in the plan is inadequate, under the Procedures, the Water Boards may impose additional conditions.
- Is finding an approved plan to be insufficient really an option? While the Water Boards may have the option of making a finding that the approved plan is inadequate, in the context of water quality certifications for water supply projects and flood risk reduction projects, this could make their timeframes even tighter.
Given all of the above concerns and considerations, that proposed Section 13389.3 is intended to codify what is in the Procedures but does not impose the same requirements as the Procedures, and that the Procedures are already required to be followed, the addition of proposed Section 13389.3 seems to add little benefit and may only cause additional confusion. The committee may wish to require the author to continue to work with committee staff to either amend the language so that it is consistent with what is required by Procedures, or to remove these provisions from the bill to avoid confusion.
Trading CEQA for NEPA. SB 23 also requires SWRCB, by January 1, 2025, to review and adopt general water quality certifications for general nationwide permits issued by the Army Corps under Section 404 of the Clean Water Act within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In reviewing and adopting these certifications, SB 23 requires SWRCB to rely on the environmental review completed by the Army Corps under NEPA for compliance with its duties under CEQA.
California’s Porter-Cologne is more stringent in its requirements than the federal Clean Water Act, and has a broader reach, applying to more activities and more categories of water. For example, Porter-Cologne governs groundwater and isolated wetlands, which are generally outside the scope of the federal Clean Water Act, and Porter-Cologne’s discharge requirements, apply to both point and non-point sources of pollution.
CEQA requires, in the event that a project requires both an EIR pursuant to CEQA and an EIS pursuant to NEPA, the lead agency, whenever possible, to use the EIS as the EIR if that EIS complies with the requirements of CEQA. (Public Resources Code (PRC) §§21083.5, 21083.7).
However, SB 23 would require SWRCB to rely on the Army Corps’ environmental review performed under NEPA, with no consideration if that environmental review complies with CEQA. Requiring SWRCB to use NEPA documents prevents SWRCB from being able to do its own CEQA analysis and determine whether each general nationwide permit is consistent with California law. SWRCB would not be able to consider the potential significant environmental impacts of the general nationwide permit, would not be able to use California’s wetlands policy to address these impacts and would undermine the state’s ability to protect its water quality. As pointed out in one of the coalition letters, SWRCB already has the authority to approve nationwide permits issued by the Army Corps, but in 2020, SWRCB rejected approval of 39 Army Corps permits because they did not assure compliance with State law.
To ensure that SWRCB has the ability to adequately regulate the discharge of dredge and fill material in accordance with the state’s environmental protection standards and uphold the State’s wetlands policy, the committee may wish to amend the bill to require SWRCB to review and act on the Army Corps permits, which would maintain SWRCB’s discretion to reject permits that do not comply with State law, and to amend the bill to only require use of NEPA documents if the environmental review complies with CEQA. (See Amendment 5)
Choose wisely. Water supply projects can be especially controversial and complex. Is it appropriate to require CDFW or the Water Boards to act within expedited timeframes for these types of projects? The main purposes of the LSAA and water quality certifications is the protection and conservation of fish and wildlife resources and to protect the water quality of the state’s water resources, respectively. Could expedited timeframes, particularly for controversial and complex water supply projects, force agencies to choose between expediency and completeness? While the Water Boards, as a final action, may choose to not issue a water certification, this in practice, would likely cause both the Water Boards and the project applicant to go back to the beginning, further delaying the process.
Here comes the sun(set). A big question continues to be – what is the impact on CDFW and the Water Boards and their ability to issue LSAAs and water quality certifications? How many projects could this entail? What does this mean for CDFW and Water Board staff resources? What does this mean for the agencies’ ability to ensure fish and wildlife resources and the state’s water resources are adequately protected? SB 23 could drastically change how CDFW and the Water Boards issue LSAAs and water quality certifications. It may be helpful for the Legislature to have a mechanism that would give them the ability to “check-in” on these new processes and reevaluate, as appropriate. The committee may wish to amend the bill to sunset its provisions on January 1, 2029. (See Amendments 6 & 7)
To be continued. This analysis identifies a number of concerns, some of which can be addressed with committee amendments, others that are still pending. Working out these issues will require continued discussions with various stakeholder groups. Should the committee decide to approve the bill out of committee, the committee may wish to require the author to continue to work with committee staff on these issues and reserves the right to bring the bill back before the committee if it finds that the issues and concerns in this analysis have not been adequately addressed.
Related legislation
SB 586 (Eggman) allows Mossdale Tract and West Sacramento to not achieve the urban level of flood protection by a date certain if an active federal project is in place. SB 586 was heard in this committee on March 28, 2023, and passed out with a vote of 9 – 0. SB 586 is now pending in the Senate Governance and Finance Committee.
SB 651 (Grove) exempts from CEQA actions taken by state and local agencies, and permits necessary to carry out those actions, to accelerate approvals for projects that enhance the ability of the state or local agency to capture high precipitation events for local storage or recharge. These projects would not be required to have a written certification of consistency with the Delta Plan. SB 651 also exempts from CEQA recharge projects under the Department of Water Resources’ Sustainable Groundwater Management Grant Program and flood-managed aquifer recharge projects, as specified. SB 651 is set to be heard in this committee on April 11, 2023.
AB 830 (Soria) exempts from lake or streambed alteration agreement provisions temporary operation of existing infrastructure or temporary pumps being used to divert flood stage and monitor stage flows to beneficial groundwater recharge necessary to protect downstream life and property. AB 830 is pending in the Assembly Water, Parks, and Wildlife Committee.
AB 1581 (Kalra) exempts certain individuals, public agencies, universities, zoological gardens, and scientific or education institutions authorized to import, export, take, or possess any endangered species, threatened species, or candidate species for scientific, educational, or management purposes from the requirement to obtain a lake or streambed alteration agreement and instead requires these entities to submit to CDFW a written notification and copy of proposed environmental protection measures authorized by other agencies’ programmatic habitat restoration permits and guidance. AB 1581 is pending in the Assembly Water, Parks, and Wildlife Committee.
Previous legislation
AB 2545 (Gallagher, 2018) would have required CDFW, until January 1, 2023, to establish procedures for the issuance of a general lake or streambed alteration agreement in lieu of an individual agreement and would have required CDFW to adopt general agreements for lake or streambed alteration agreements. AB 2545 was held in this committee.
AB 3102 (Gray, 2018) would, in the case of an activity for which an environmental impact report, negative declaration, or mitigated negative declaration has been certified or adopted, have limited the measures to protect fish or wildlife resource proposed or included in an LSAA to the mitigation measures, if any, contained in the certified or adopted environmental document if CDFW had been provided the opportunity for consultation and comment pursuant to CEQA. AB 3102 was held in the Assembly Water, Parks, and Wildlife Committee.
AB 1704 (Dodd, 2016) would have required CDFW, if an activity includes the diversion of water and the LSAA notification is accompanied with a proposed registration of water use, a renewal of registration, or an amended registration, to determine whether the notification is complete in the same manner it determines whether other notices are complete and to propose any conditions on the registration in a draft agreement. AB 1704 would have provided that the conditions on a registration that are included in a final LSAA agreement are deemed conditions upon the appropriations of water under the registration. AB 1704 was held in the Senate Appropriations Committee on suspense.
SB 665 (La Malfa, 2011) would have amended the LSAA program to, instead of prohibiting substantial diversion or obstruction, prohibit the installation of new diversion or means of diversion, or substantially alter an existing means of diversion. SB 665 also would have deleted the LSAA exemption for pre-1977 agreements, and would have exempted from lake or streambed alteration requirements activities that involve the routine maintenance and operation of water supply, drainage, flood control, or waste treatment and disposal facilities constructed and in existence before 2000, unless the work has substantially changed or conditions affecting fish and wildlife have substantially changed. This bill was held in this committee.
SUGGESTED AMENDMENTS
AMENDMENT 1
Amend FGC §1618 to add subdivision (e) as follows:
(e) On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, and make available for public review on their internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees, a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.
AMENDMENT 2
Amend FGC 1618(c)(1)(A) as follows:
(A) 180 days after receipt of a complete notification, as determined by the department.
AMENDMENT 3
Amend Fish and Game Code §1618(b)(2) as follows:
(2) Submit final environmental documentation to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code
AMENDMENT 4
Amend FGC §1618(c)(1)(B) as follows:
(B) Sixty days after receipt of final the certified or adopted environmental documentation document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement.
AMENDMENT 5
Amend Water Code §13389.3(d) as follows:
(d) By January 1, 2025, the state board shall review and adopt take action on general water quality certification for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In adopting its consideration of the general water quality certifications, the state board shall rely upon an, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code, pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.
AMENDMENT 6
Amend Fish and Game Code §1618 to add:
“(f) This section shall become inoperative on January 1, 2029.”
AMENDMENT 7
Add Section 13389.5 to the Water Code to add:
“13389.5. This article shall become inoperative on January 1, 2029.”
SUPPORT
Association of California Water Agencies (sponsor)
Amador Water Agency
American Pistachio Growers
Bay Area Council
Bella Vista Water District
CalChamber
CalDesal
California Alliance for Jobs
California Building Industry Association
California Citrus Mutual
California Council for Environmental & Economic Balance
California Date Commission
California Farm Bureau Federation
California Fresh Fruit Association
California Municipal Utilities Association
California Special Districts Association
California Strawberry Commission
Calleguas Municipal Water District
Carmichael Water District
Citrus Heights Water District
City of Santa Rosa
Coachella Valley Water District
Coastside County Water District
County of Humboldt
County of Monterey
County of Tuolumne
Cucamonga Valley Water District
Desert Water Agency
Eastern Municipal Water District
El Dorado Irrigation District
Elk Grove Water District
Elsinore Valley Municipal Water District
Foothill Municipal Water District
Fresno Metropolitan Flood Control District
Habitat for Humanity, Merced/Stanislaus County
Hidden Valley Lake Community Services District
Humboldt Bay Municipal Water District
Indian Wells Valley Water District
Irvine Ranch Water District
Kings River Conservation District
McKinleyville Community Services District
Mesa Water District
Monterey Peninsula Water Management District
Nisei Farmers League INC.
North Marin Water District
Olivenhain Municipal Water District
Orange County Water District
Orchard Dale Water District
Padre Dam Municipal Water District
Pajaro Valley Water Management Agency
Rancho Water
Regional Water Authority
Rowland Water District
San Bernardino Valley Municipal Water District
San Diego County Water Authority
San Joaquin Council of Governments
San Juan Water District
San Luis Delta-Mendota Water Authority
Santa Clara Valley Habitat Agency
Santa Clara Valley Water District
Santa Fe Irrigation District
Solano County Water Agency
Solano Water
Stockton East Water District
Tahoe City Public Utility District
Three Valleys Municipal Water District
Tuolumne County Water Agency
Tuolumne Utilities District
Turlock Irrigation District
United Water Conservation District
United Way of Merced County
Upper San Gabriel Valley Municipal Water District
Utica Water and Power Authority
Valley Center Municipal Water District
Valley Onward
Vista Irrigation District
Walnut Valley Water District
Western Growers Association
Western Municipal Water District
Western Plant Health Association
OPPOSITION
California Environmental Voters (formerly CLCV)
California Trout
Clean Water Action
Community Water Center
Defenders of Wildlife
Environmental Law Foundation
Friends of the River
Golden State Salmon Association
Institute for Fisheries Resources
Leadership Counsel for Justice & Accountability
Los Angeles Waterkeeper
Mono Lake Committee
National Resources Defense Council
Pacific Coast Federation of Fishermen's Associations
Restore the Delta
San Francisco Baykeeper
Sierra Club California
Trout Unlimited
Union of Concerned Scientists
-- END --
Discussed in Hearing
Senate Standing Committee on Environmental Quality
Senate Standing Committee on Natural Resources and Water
Bill Author
Bill Co-Author(s):