SB 270: California Environmental Quality Act: university housing development projects: exemption.
- Session Year: 2023-2024
- House: Senate
- Latest Version Date: 2023-04-18
Current Status:
Failed
(2024-02-01: Returned to Secretary of Senate pursuant to Joint Rule 56.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA requires a lead agency to prepare an environmental impact report when designating a housing sustainability district to identify and mitigate, to the extent feasible, environmental impacts resulting from the designation.CEQA exempts from its requirements a housing project undertaken in a housing sustainability district designated by a local government if specified requirements are met, including that the lead agency has certified an environmental impact report for the district, and the Department of Housing and Community Development has approved the district, within 10 years of the lead agencys review of the housing project.This bill would instead allow the exemption to apply if the lead agency has certified an environmental impact report for the district, and the Department of Housing and Community Development has approved the district, within 12 years of the lead agencys review of the housing project.Existing law, until January 1, 2030, exempts from CEQA a university housing development project carried out by a public university on real property owned by the public university if the project meets certain requirements, including that each building within the project is certified as Leadership in Energy and Environmental Design (LEED) platinum or better by the United States Green Building Council. Existing law requires the lead agency, if the university housing development project is exempt from CEQA under the above provision, to file the LEED certificate for buildings within the project and a notice determining that the construction impacts of the project have been fully mitigated with the Office of Planning and Research and the county clerk of the county in which the project is located.
This bill would revise the exemption for a university housing development project to require each building within the project to be certified as LEED gold with a point total of 79 or better. Because the bill would result in additional university housing development projects being exempt from CEQA, thereby increasing the duties of the county clerk, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA requires a lead agency to prepare an environmental impact report when designating a housing sustainability district to identify and mitigate, to the extent feasible, environmental impacts resulting from the designation.
CEQA exempts from its requirements a housing project undertaken in a housing sustainability district designated by a local government if specified requirements are met, including that the lead agency has certified an environmental impact report for the district, and the Department of Housing and Community Development has approved the district, within 10 years of the lead agencys review of the housing project.
This bill would instead allow the exemption to apply if the lead agency has certified an environmental impact report for the district, and the Department of Housing and Community Development has approved the district, within 12 years of the lead agencys review of the housing project.
(a)For purposes of this section, the following definitions apply:
(1)Faculty and staff housing project means one or more housing facilities to be occupied by faculty or staff of one or more campuses, and owned by a public university, including dining, academic, and faculty and staff support service spaces and other necessary and usual attendant and related facilities and equipment.
(2)Public university means the University of California, the California State University, or the California Community Colleges.
(3)Skilled and trained workforce has the same meaning as in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(4)Student housing project means one or more housing facilities to be occupied by students of one or more campuses and owned by a public university, including dining, academic and student support service spaces, and other necessary and usual attendant and related facilities and equipment.
(5)University housing development project or project means a student housing project or a faculty and staff housing project that is not located, in whole or in part, on a site that is any of the following:
(A)Either prime farmland or farmland of statewide importance, as defined pursuant to United States Department of Agriculture land inventory and monitoring criteria, as modified for California, and designated on the maps prepared by the Farmland Mapping and Monitoring Program of the Department of Conservation, or land zoned or designated for agricultural protection or preservation by a local ballot measure that was approved by the voters of that jurisdiction.
(B)Wetlands, as defined in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(C)Within a very high fire hazard severity zone, as determined by the State Fire Marshal pursuant to Section 51178 of the Government Code, or within a high or very high fire hazard severity zone as indicated on maps adopted by the State Fire Marshal pursuant to Section 4202. This subparagraph does not apply to sites excluded from the specified fire hazard severity zones by a local agency, pursuant to subdivision (b) of Section 51179 of the Government Code, or sites that have adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the project.
(D)Either a hazardous waste site listed pursuant to Section 65962.5 of the Government Code or a hazardous substances release site designated by the Department of Toxic Substances Control pursuant to Section 25356 of the Health and Safety Code, unless the State Department of Public Health, State Water Resources Control Board, or Department of Toxic Substances Control has cleared the site for residential use or residential mixed uses.
(E)Within a delineated earthquake fault zone as determined by the State Geologist in any official maps published by the State Geologist, unless the project complies with applicable seismic protection building code standards adopted by the California Building Standards Commission under the California Building Standards Law (Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code), and by any local building department under Chapter 12.2 (commencing with Section 8875) of Division 1 of Title 2 of the Government Code.
(F)Within a special flood hazard area subject to inundation by a 1 percent annual chance flood (100-year flood) as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site. A project may be located on a site described in this subparagraph if either of the following are met:
(i)The site has been subject to a Letter of Map Revision prepared by the Federal Emergency Management Agency and issued to the local government.
(ii)The site meets Federal Emergency Management Agency requirements necessary to meet minimum flood plain management criteria of the National Flood Insurance Program pursuant to Part 59 (commencing with Section 59.1) and Part 60 (commencing with Section 60.1) of Subchapter B of Chapter I of Title 44 of the Code of Federal Regulations.
(G)Within a regulatory floodway as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency, unless the project has received a no-rise certification in accordance with Section 60.3(d)(3) of Title 44 of the Code of Federal Regulations. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site.
(H)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(I)Habitat for protected species identified as candidate, sensitive, or species of special status by a state or federal agency, fully protected species, or species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(J)Lands under conservation easement.
(b)Except as provided in subdivision (c), (d), this division does not apply to a university housing development project carried out by a public university on real property owned by the public university that meets all of the following requirements:
(1)(A)(i)If the university housing development project is carried out by the University of California, the university housing development project is consistent with the most recent long range development plan environmental impact report prepared pursuant to Section 21080.09 and certified on or after January 1, 2018, and any applicable tiered environmental analysis, so long as none of the events specified in Section 21166 have occurred.
(ii)If the university housing development project is carried out by the California State University or the California Community Colleges, the university housing development project is consistent with the most recent master plan environmental impact report prepared pursuant to Section 21080.09 and certified no more than 10 years before the determination that the exemption under this section applies and with any applicable tiered environmental analysis, so long as none of the events specified in Section 21166 have occurred.
(B)For purposes of subparagraph (A), the project is consistent with the relevant environmental impact report or applicable tiered environmental analysis, if theres substantial evidence in the record that would allow a reasonable person to find it consistent.
(2)Each building within the university housing development project is certified as Leadership in Energy and Environmental Design (LEED) platinum gold with a point total of 79 or better by the United States Green Building Council.
(3)No more than one-third of the project square footage shall be used for dining, academic, or student support service spaces, or other necessary and usual attendant and related facilities and equipment.
(4)The project is either within one-half mile of a major transit stop or one-half mile of the campus boundary, as defined by the public universitys long range development plan or master plan, as appropriate, or has 15 percent lower per capita vehicle miles traveled as compared to that for the jurisdiction in which the university housing development project is located.
(5)The project has a transportation demand management program.
(6)The projects construction impacts are fully mitigated consistent with applicable law.
(7)(A)The project does not result in any net additional emission of greenhouse gases, as determined by an independent third-party evaluation approved by the lead agency.
(B)To maximize public health and environmental benefits, the public university shall ensure that the measures will reduce the emissions of greenhouse gases in the project area and in the neighboring communities.
(C)Not less than 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this paragraph shall be from local, direct greenhouse gas emissions reduction measures, including, but not limited to, any of the following:
(i)Project design features or onsite reduction measures, or both design features and onsite reduction measures, that include, but are not limited to, any of the following:
(I)Implementing project design features that enable the project to exceed the building energy efficiency standards set forth in Part 6 (commencing with Section 100) of Title 24 of the California Code of Regulations, except for 50 percent of emissions reductions attributable to design features necessary to meet the LEED platinum certification requirement. certification requirements for LEED gold with a point total of 79 or better.
(II)Requiring a transportation demand management program to reduce single-occupancy vehicular travel and vehicle miles traveled.
(III)Providing onsite renewable energy generation, including a solar roof on the project with a minimum peak generation capacity of 500 kilowatts.
(IV)Providing solar-ready roofs.
(V)Providing cool roofs and cool parking promoting cool surface treatment for new parking facilities.
(ii)Offsite reduction measures in neighboring communities, including, but not limited to, any of the following:
(I)Providing funding to an offsite mitigation project consisting of replacing buses, trolleys, or other transit vehicles with zero-emission vehicles.
(II)Providing offsite safety or other improvements for bicycles, pedestrians, and transit connections.
(III)Undertaking or funding building retrofits to improve the energy efficiency of existing buildings.
(D)(i)The public university may obtain offset credits for up to 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this subdivision that produce emissions reductions within the jurisdiction that the university housing development project is located. Any offset credits shall be verified by a third party accredited by the State Air Resources Board, and shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offset be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the same community in which the project is located or adjacent communities.
(ii)If 50 percent of greenhouse gas emissions reductions necessary to achieve no additional emissions of greenhouse gases cannot be feasibly and fully mitigated by offset credits as described in clause (i), the mitigation of the remaining emissions of greenhouse gases shall be achieved pursuant to the following priority:
(I)Offset credits that would also reduce the emissions of criteria air pollutants or toxic air contaminants. The offsets shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offsets be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the community within which the project is located or in adjacent communities.
(II)If the remaining emissions of greenhouse gases cannot be feasibly or fully mitigated by the offsets credits described in subclause (I), the remaining unmitigated greenhouse gas emissions shall be mitigated through the use of offsets that would also reduce emissions of criteria air pollutants or toxic air contaminants and shall be undertaken in a manner consistent with subclause (I) and shall be undertaken from sources that provide a specific, quantifiable, and direct environmental and public health benefit to the community in which the project is located.
(E)It is the intent of the Legislature, in enacting this paragraph, to maximize the environmental and public health benefits from measures to mitigate the emissions of greenhouse gases of a university housing development project to those people that are impacted most by the project.
(8)All contractors and subcontractors at every tier on the project will be required to pay prevailing wages in accordance with Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(9)(A)An entity shall not be prequalified or shortlisted or awarded a contract to perform work on the project unless the entity provides an enforceable commitment to the public university that the entity and its contractors and subcontractors at every tier will use a skilled and trained workforce to perform all work on the project that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)This paragraph does not apply if any of the following requirements are met:
(i)The public university has entered into a project labor agreement that will bind all contractors and subcontractors at every tier performing work on the project to use a skilled and trained workforce, and the entity agrees to be bound by that project labor agreement.
(ii)The project is being performed under the extension or renewal of a project labor agreement that was entered into by the public university before January 1, 2023.
(iii)The entity has entered into a project labor agreement that will bind the entity and all of its contractors and subcontractors at every tier performing the project to use a skilled and trained workforce.
(10)(A)Except as provided in subparagraph (B), for a project carried out by the University of California, all cleaning, maintenance, groundskeeping, food service, or other work traditionally performed by persons with University of California Service Unit (SX) job classifications shall be performed only by employees of the University of California at any facility, building, property, or space that is part of the project.
(B)Subparagraph (A) does not apply to, and shall not restrict the performance of, work done under contract and paid for in whole or in part out of public funds when the work is either of the following:
(i)Construction, alteration, demolition, installation, cleanup work at the construction jobsite, or repair work, including work performed during the design and all phases of construction, including preconstruction and postconstruction phases.
(ii)Carpentry, electrical, plumbing, glazing, painting, and other craftwork designed to preserve, protect, or keep a publicly owned facility in a safe and continuously usable condition, including repairs, cleaning, and other operations on machinery and other equipment permanently attached to the building or real property as fixtures.
(11)(A)The public university holds at least one noticed public hearing in the project area to hear and respond to public comments before determining that a university housing development project is exempt pursuant to this section.
(B)The public university shall give public notice of the meeting to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the public universitys internet website and social media accounts.
(12)The public university files a notice of exemption with the Office of Planning and Research pursuant to subdivisions (b) to (d), inclusive, of Section 21108.
(c)(1)The public university or a relevant public agency with authority to issue a certificate of occupancy for a building within the project shall not issue the certificate of occupancy for the building unless both of the following occurs:
(A)The lead agency receives certification of LEED platinum gold with a point total of 79 or better from the United States Green Building Council for the building.
(B)The lead agency determines that the construction impacts of the project have been fully mitigated as required pursuant to paragraph (6) of subdivision (b) and issues a notice making that determination.
(2)The lead agency shall file the certificate and the notice described in paragraph (1) with the Office of Planning and Research and the county clerk of the county in which the project is located. Subdivision (c) of Section 21108 and subdivision (c) of Section 21152 shall apply to the certificate and notice filed pursuant to this paragraph.
(3)An action or proceeding alleging that the certificate of occupancy has been issued in violation of this subdivision shall be commenced within 35 days of the filing by the lead agency of the certificate and notice under this subdivision.
(d)The exemption from this division provided by subdivision (b) does not apply to a university housing development project that meets any of the following criteria:
(1)The project would require the demolition of any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents to levels affordable to persons and families of moderate, low, or very low income.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that has been occupied by tenants within the past 10 years.
(D)A historic structure that is listed on a national, state, or local historic register.
(2)The project is located on a site that was previously used for housing that was occupied by tenants and was demolished within 10 years before the public university submits an application under this section.
(3)The project is located on a site that contains housing units that are occupied by tenants and the housing units are offered for sale, or were subsequently offered for sale, to the general public by a subdivider or subsequent owner of the site.
(4)The project consists of more than 2,000 units or 4,000 beds.
(e)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
SECTION 1.Section 21155.11 of the Public Resources Code is amended to read:21155.11.This division does not apply to a housing project undertaken in a housing sustainability district designated by a local government if all of the following are met:(a)The lead agency has certified an environmental impact report for the housing sustainability district, and the Department of Housing and Community Development has approved the housing sustainability district pursuant to Section 66202 of the Government Code, within 12 years of the lead agencys review of the housing project.(b)The housing project meets the conditions specified in the designation for the housing sustainability district.(c)The housing project is required to implement appropriate mitigation measures identified in the environmental impact report prepared pursuant to Section 21155.10 to mitigate environmental impacts identified by that environmental impact report.This division does not apply to a housing project undertaken in a housing sustainability district designated by a local government if all of the following are met:
(a)The lead agency has certified an environmental impact report for the housing sustainability district, and the Department of Housing and Community Development has approved the housing sustainability district pursuant to Section 66202 of the Government Code, within 10 12 years of the lead agencys review of the housing project.
(b)The housing project meets the conditions specified in the designation for the housing sustainability district.
(c)The housing project is required to implement appropriate mitigation measures identified in the environmental impact report prepared pursuant to Section 21155.10 to mitigate environmental impacts identified by that environmental impact report.
|
Date
|
Status
|
|---|---|
| Feb 1, 2024 | Returned to Secretary of Senate pursuant to Joint Rule 56. |
| May 18, 2023 | May 18 hearing: Held in committee and under submission. |
| May 12, 2023 | Set for hearing May 18. |
| May 8, 2023 | May 8 hearing: Placed on APPR suspense file. |
| May 1, 2023 | Set for hearing May 8. |
| Apr 27, 2023 | Withdrawn from committee. |
| Apr 27, 2023 | Re-referred to Com. on APPR. |
| Apr 26, 2023 | From committee: Do pass and re-refer to Com. on HOUSING. (Ayes 7. Noes 0. Page 936.) (April 26). Re-referred to Com. on HOUSING. |
| Apr 18, 2023 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on E.Q. |
| Apr 14, 2023 | Set for hearing April 26. |
| Mar 16, 2023 | March 29 set for second hearing canceled at the request of author. |
| Mar 7, 2023 | Set for hearing March 29. |
| Feb 28, 2023 | March 15 set for first hearing canceled at the request of author. |
| Feb 10, 2023 | Set for hearing March 15. |
| Feb 9, 2023 | Referred to Coms. on E.Q. and HOUSING. |
| Feb 1, 2023 | From printer. May be acted upon on or after March 3. |
| Jan 31, 2023 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| May 8, 2023 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 26, 2023 | Do pass, but first be re-referred to the Committee on [Housing] | Senate Standing Committee on Environmental Quality |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 350 Sacramento | * Support | Mar 19, 2024 |
| American Forest & Paper Association | * Against Unless Amend | Mar 19, 2024 |
| American Recyclable Plastic Bag Alliance | * Against | Mar 19, 2024 |
| Association of Plastic Recyclers | * Against | Mar 19, 2024 |
| California Grocers Association | * Support | Mar 19, 2024 |
| California Retailers Association | * Indeterminate | Mar 19, 2024 |
| CALPIRG | * Support | Mar 19, 2024 |
| Clean Water Action | * Support | Mar 19, 2024 |
| Environment California | * Support | Mar 19, 2024 |
| Kroger | * Support | Mar 19, 2024 |
| PreZero US | * Against Unless Amend | Mar 19, 2024 |
| Sierra Club California | * Support | Mar 19, 2024 |
| Surfrider Foundation | * Support | Mar 19, 2024 |
| United Food And Commercial Workers Western States Council | * Against Unless Amend | Mar 19, 2024 |
| Yimby Action | ** Support |
SENATE COMMITTEE ON
Senator Anthony Portantino, Chair
2023 - 2024 Regular Session
SB 270 (Wiener) - California Environmental Quality Act: university housing development projects: exemption
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would replace the requirement that, for a higher education institution to utilize a particular CEQA exemption, a building be certified as Leadership in Energy and Environmental Design (LEED) Platinum with a requirement that it achieve a LEED Gold score of 79 or better.
Fiscal Impact:
- To the extent that this bill results in additional spending on faculty, staff, and student housing projects from what otherwise would occur, unknown, potentially significant costs (General Fund) to public postsecondary institutions.
- Unknown costs, likely in the low hundreds of thousands of dollars per project, for public postsecondary institutions to meet the specified requirements for projects under this bill. These costs would be offset by savings due to being exempt from other environmental reporting requirements under CEQA.
Background:
Overview of CEQA Process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a ND. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project.
What is analyzed in an environmental review? An environmental review analyzes the significant direct and indirect environmental impacts of a proposed project and may include water quality, surface and subsurface hydrology, land use and agricultural resources, transportation and circulation, air quality and greenhouse gas emissions, terrestrial and aquatic biological resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, and cultural resources. The analysis must also evaluate the cumulative impacts of any past, present, and reasonably foreseeable projects/activities within study areas that are applicable to the resources being evaluated.
CEQA provides hub for multi-disciplinary regulatory process. An environmental review provides a forum for all the described issue areas to be considered together rather than siloed from one another. It provides a comprehensive review of the project, considering all applicable environmental laws and how those laws interact with one another. For example, it would be prudent for a lead agency to know that a proposal to mitigate a significant impact (i.e. alleviate temporary traffic congestion, due to construction of a development project, by detouring traffic to an alternative route) may trigger a new significant impact (i.e. the detour may redirect the impact onto a sensitive resource, such as a habitat of an endangered species or near a hospital). CEQA provides the opportunity to analyze a broad spectrum of a project’s potential environmental impacts and how each impact may intertwine with one another.
CEQA streamlining provisions. CEQA has been amended over the years to provide several tools to expedite the review of, or altogether exempt from CEQA, various types of projects.
Projects Eligible for Exemptions
Numerous types of projects may be eligible for an exemption from CEQA review pursuant to either a statutory exemption or a “categorical” exemption in the CEQA Guidelines. Categorical exemptions are projects determined by the Secretary of the Natural Resources Agency to not have a significant effect on the environment. In general, if a project meets certain specified criteria, it is not subject to CEQA. See Comment 4 of this analysis for an overview of existing exemptions for which a university housing development project may already be eligible.
Streamlined Administrative Review
CEQA provides for streamlined processes for preparing EIRs and other CEQA documents that enable public agencies to use various special types of EIR’s to simplify preparation and avoid duplication. These various documents include “program” EIRs for a series of related actions that can be collectively characterized as a single project, “staged” EIRs for sequential projects, and “master” EIRs for community-level projects. This streamlines the review of such projects and reduces the need to prepare repetitive studies.
CEQA also provides for “tiering”—the process of analyzing general projects in a broad EIR, followed by focused review of subsequent environmental projects that are narrower in scope, thereby allowing an agency to defer analysis of certain details of later phases of long-term linked or complex projects until those phases are up for approval.
Planning for long-term development by institutions of higher education. In California, public universities prepare planning documents that help guide the university in its physical development as well as the growth of student enrollment.
University of California (UC). Each campus and medical center of the UC periodically develops an LRDP that guides its physical development – based on academic goals and projected student enrollment levels – for an established time horizon. Each plan identifies how a campus will accommodate the anticipated enrollment along with the faculty and staff needed to support that enrollment. Thus, an LRDP outlines a campus’s priorities and guides future development. CEQA requires an EIR be prepared for the LRDP and requires the UC Board of Regents, as the lead agency, to certify the EIR before approving the LRDP. Since the LRDP includes multiple projects, the accompanying EIR is typically referred to as the “master” EIR or a “program-level” EIR. As each project covered by the LRDP is implemented, a project-level EIR is prepared. However, given the certification of a program-level EIR on the LRDP, these project-level EIRs are not required to be as detailed.
UC is constitutionally exempt from local land use control. In other words, the local government’s planning commission does not have the jurisdiction to deny or oppose an LRDP or a specific project within the LRDP.
California State University (CSU). The CSU is the largest university system in the United States. Governed by the Board of Trustees, CSU's 23 campuses across the state collectively enroll 405,000 students and employ 44,000 faculty and staff. Each of the 23 CSU campuses develop a master plan that guides the future development of campus facilities based on its academic priorities and student enrollment projections. The physical plan is not subject to local land use regulations and usually covers a period of 10 years. As with UC, CEQA requires CSU campuses to complete an EIR for each master plan. The CSU Board of Trustees serves as the lead agency in the EIR process and has the responsibility of approving both the master plan and the EIR.
California Community College. Each community college district maintains a district-wide master plan, as well as a separate master plan for each college located in the district. The master plan serves as a comprehensive planning document encompassing all functions of the college or district for a period of 10 years. The master plan also includes a facilities component that evaluates existing land, infrastructure, and facility needs, and specifies the projects necessary to meet those needs. The various districts are exempt from local land use regulations. The district prepares an EIR that is subsequently reviewed and approved with the master plan by the district’s board of trustees.
Legislative Analyst Report finds LRDPs lack accountability, standardization, and clarity. In 2007, the Legislative Analyst’s Office (LAO) published the report, A Review of UC’s Long Range Development Planning Process. That report reviewed the process used by UC to prepare LRDPs and analyzed whether the process adequately addressed impacts that campus growth has on surrounding communities. In general, the report found a lack of accountability, standardization, and clarity in the current process, and noted that this creates tension between the university and local communities regarding campus growth and the mitigation of the environmental impacts related to the growth. The LAO findings can be summarized as:
- Lack of state accountability and oversight. Generally, the state neither approves the LRDP nor the implementation of the mitigation measures identified in the EIR.
- Lack of standardization in public participation leading to varying degrees of local community involvement.
- Minimal systemwide coordination in projecting enrollment for recent LRDPs.
- Campuses want to primarily expand graduate enrollment due to expected decline in number of California public high school graduates.
- Lack of clarity in CEQA requirements making its application uncertain and inconsistent.
- No campus has reached a “fair share” agreement with neighboring jurisdictions to contribute towards mitigating off-campus impacts.
While it is unclear if any systemwide changes have been made to LRDPs to address these concerns since the report was published, it does appear that some LRDPs have incorporated community advisory boards.
California State Government & LEED. As noted above, EO B-18-12 issued by former Governor Jerry Brown in April 2012 included a requirement that all new or major renovated state buildings and build-to-suit leases larger than 10,000 square feet obtain LEED Silver certification or higher. This formalized a policy that the Department of General Services states on its website has been in place since 2004.
According to documents on the UC Office of the President’s website, as of January 6, 2023, of 408 UC-related projects built since 2005, 18 are LEED Certified, 83 are LEED Silver, 224 are LEED Gold, and 90 achieved LEED Platinum status.
Proposed Law:
This bill would replace the requirement that a housing development project be certified as LEED Platinum in order to utilize the SB 886 CEQA exemption with a requirement that the project be certified as LEED Gold with a score of 79 before a certificate of occupancy can be issued.
Related Legislation:
SB 886 (Wiener, Chapter 663, Statutes of 2022) was designed to encourage more faculty, staff, and student housing to be built on UC, CSU, and CCC campuses.
The bill exempted these projects from CEQA as long as they met a number of alternative standards and benchmarks, including:
- The project is consistent with the school’s most recent long-range development plan (LRDP) EIR or master plan EIR and any applicable tiered environmental analysis.
- Each building of the project is certified as LEED Platinum or better before the certificate of occupancy is issued.
- The project is either within one-half mile of a major transit stop, one-half mile of the campus boundary, or has 15% lower per capita vehicle miles traveled (VMT).
- The project does not result in any net additional greenhouse gas (GHG) emissions.
-- END --
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Allen, Chair
2023 - 2024 Regular
Bill No: SB 270
Author: | Wiener | ||
Version: | 4/18/2023 | Hearing Date: | 4/26/2023 |
Urgency: | No | Fiscal: | Yes |
Consultant: | Evan Goldberg | ||
SUBJECT: California Environmental Quality Act (CEQA): University housing development projects: exemption.
DIGEST: This bill replaces the requirement that, for a higher education institution to utilize a particular CEQA exemption, a building be certified as Leadership in Energy and Environmental Design (LEED) Platinum with a requirement that it achieve a LEED Gold score of 79 or better.
ANALYSIS:
Existing law:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a project to prepare a negative declaration (ND), mitigated negative declaration (MND), or environmental impact report (EIR) for the project, unless the project is exempt from CEQA. (Public Resources Code (PRC) §21000 et seq.). If a project may have a significant effect on the environment, the lead agency must prepare a draft EIR. (CEQA Guidelines §15064(a)(1), (f)(1))
- Provides a university housing development project with an exemption from CEQA if it meets certain requirements, one of which is that the housing development project be certified as LEED Platinum before a certificate of occupancy is issued for the project. (PRC §21080.58)
- Defines “public higher education” as (1) the California Community Colleges (CCC), (2) the California State University (CSU), and each campus, branch, and function thereof, and (3) each campus, branch, and function of the University of California (UC). (Education Code §66010)
- Executive Order (EO) B-18-12, issued in April 2012, includes many green building related requirements, including one that all new or major renovated state buildings and build-to-suit leases larger than 10,000 square feet obtain LEED Silver certification or higher.
This bill:
- Replaces the requirement that a housing development project be certified as LEED Platinum in order to utilize the SB 886 CEQA exemption with a requirement that the project be certified as LEED Gold with a score of 79 before a certificate of occupancy can be issued.
Background
- The A, B, C’s of CEQA. CEQA was enacted by the Legislature and signed into law by Governor Ronald Reagan in 1970. While it has evolved into a very complex Act over the past 53 years, at its core the basic principles of CEQA are relatively simple.
It is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment.
CEQA is self-executing statute that is enforced by civil lawsuits that can challenge any project’s environmental review. Public agencies, as well as private individuals and organizations, can file lawsuits under CEQA.
- Follow The LEEDer. Leadership in Energy and Environmental Design, better known as LEED, is a voluntary green building standard established by the U.S. Green Building Council (USGBC) and it is the most widely used green building rating system in the world.
The LEED system is designed to encourage green and sustainable building practices. Loosely speaking, the LEED system awards points to a building based on dozens of different factors such as the type of building materials used, whether the building is located near public transportation, the type of indoor lighting provided, and much more. Buildings can be LEED Certified (40-49 points), LEED Silver (50-59 points), LEED Gold (60-79 points) or LEED Platinum (80+ points).
- California State Government & LEED. As noted above, EO B-18-12 issued by former Governor Jerry Brown in April 2012 included a requirement that all new or major renovated state buildings and build-to-suit leases larger than 10,000 square feet obtain LEED Silver certification or higher. This formalized a policy that the Department of General Services states on its website has been in place since 2004.
According to documents on the UC Office of the President’s website, as of January 6, 2023, of 408 UC-related projects built since 2005, 18 are LEED Certified, 83 are LEED Silver, 224 are LEED Gold, and 90 achieved LEED Platinum status.
- SB 886 – A Brief History. SB 886 (Wiener, Chapter 663, Statutes of 2022) was designed to encourage more faculty, staff, and student housing to be built on UC, CSU, and CCC campuses.
The bill exempted these projects from CEQA as long as they met a number of alternative standards and benchmarks, including:
- The project is consistent with the school’s most recent long-range development plan (LRDP) EIR or master plan EIR and any applicable tiered environmental analysis.
- Each building of the project is certified as LEED Platinum or better before the certificate of occupancy is issued.
- The project is either within one-half mile of a major transit stop, one-half mile of the campus boundary, or has 15% lower per capita vehicle miles traveled (VMT).
- The project does not result in any net additional greenhouse gas (GHG) emissions.
Comments
- Purpose of Bill. According to the author, “Currently, California is in the depths of a housing crisis. The impacts of this go beyond typical residential developments and into other areas such as student housing. As of 2019, 5% of UC, 10% of CSU, and 19% of CCC students are homeless. In an attempt to address the growing student housing crisis, the Legislature passed SB 886 (Wiener) in 2022, which provided a streamlined path for student and faculty housing in specified circumstances. However, some of the requirements for projects to utilize the law simply do not work: SB 886 requires projects to accomplish LEED Platinum certification prior to a CEQA exemption being granted or the certificate of occupancy being issued, however LEED Platinum cannot be certified until a building is occupied. SB 270 addresses this timing issue, reducing the requirement of these buildings from LEED Platinum to LEED Gold, which can be achieved prior to occupancy. To assure these projects are still held to a high standard, SB 270 requires the LEED Gold certification to include the highest type of LEED Gold – achieving 79 or more points as determined by LEED.”
- Chicken v. Egg: Film At 11:00. This bill focuses on SB 886’s requirement for a building to be certified as LEED Platinum before the certificate of occupancy can be issued.
The challenge with this provision of the law is, according to the USGBC, a building generally cannot achieve LEED Platinum status until after it is occupied. That’s because in most cases, a study has to be commissioned to look at whether the building is performing as it was designed to perform. For example, are the forecasted energy savings being realized? Are the GHG emissions as low as anticipated when the building was designed? Once a study looking at those and many other factors is completed, additional LEED points can be awarded and a building may move from LEED Gold to LEED Platinum status.
- Why Just Go For The Gold When You Can Go For The Platinum? This bill replaces the LEED Platinum requirement with one that – to be able to use SB 886’s CEQA exemption – requires a building to achieve the highest LEED Gold score possible (79) before getting a certificate of occupancy.
It’s important to note that LEED certification is a “point in time” assessment of how “green” a building is based on the score it receives from the USGBC. There is nothing inherent in the LEED scoring system that precludes a LEED Silver building from eventually becoming LEED Gold certified or a LEED Gold building from becoming LEED Platinum.
As noted in the “Background” section, UC has already developed nearly 100 buildings – including a number of housing facilities – that have met the LEED Platinum standard.
Given that, combined with the reality that achieving LEED Platinum status prior to receiving a certificate of occupancy is often difficult to accomplish, it is the committee staff’s understanding that should this bill make its way to the Assembly, the author has committed to amend the bill to:
- Require any entity that complies with this bill’s new LEED Gold (with a score of 79) standard to achieve LEED Platinum status within 12 months.
- Preclude the higher education system that utilized the SB 886 CEQA exemption from using it again until such time the building does become LEED Platinum certified.
DOUBLE REFERRAL:
If this measure is approved by the Senate Environmental Quality Committee, the do pass motion must include the action to re-refer the bill to the Senate Housing Committee.
Related/Prior Legislation
SB 886 (Wiener, Chapter 663, Statutes of 2022) provided a CEQA exemption until January 1, 2030, for certain UC, CSU, and CCC faculty, staff, and student housing projects if they meet certain environmental standards.
SOURCE:
Author
SUPPORT:
YIMBY Action
OPPOSITION:
None received
ARGUMENTS IN SUPPORT:
YIMBY writes in support:
“To address the growing student housing crisis, SB 886 provided a statutory exemption from the California Environmental Quality Act (CEQA) for UCs, CSUs and CCCs student and faculty housing projects under specified circumstances. However, one of the qualifications for these projects to utilize SB 886 is a requirement for all buildings to meet Leadership in Energy and Environmental Design (LEED) Platinum certification. Platinum is the highest level of LEED certification, and as such includes numerous metrics of the buildings to determine if it meets the requisites for certification. Some of these determinations cannot be accomplished until the building is occupied. Given this, SB 886’s requirement to certify LEED Platinum prior to being granted the CEQA exemption and the certificate of occupancy simply isn’t possible.
“SB 270 addresses this timing issue, reducing the requirement of these buildings from LEED Platinum to LEED Gold, which can be achieved prior to occupancy. To assure these projects are still held to a high standard, SB 270 requires the LEED Gold certification to include the highest type of LEED Gold – achieving 79 or more points as determined by LEED.”
-- END --
Discussed in Hearing
Assembly Standing Committee on Natural Resources
Senate Standing Committee on Environmental Quality
Bill Author
Bill Co-Author(s):